Department of Commerce, Community, and Economic Development
Alaska Oil and Gas Conservation Commission
Loading...
HomeMy WebLinkAbout198-123Pages NOT Scanned in this Well History File
XHVZE
This page identifies those items that were not scanned during the initial scanning project.
They are available in the original file and viewable by direct inspection.
//~'~/~--~ File Number of Well History File
PAGES TO DELETE
RESCAN
Color items - Pages:
Grayscale, halftones, pictures, graphs, charts -
Pages: ~, ~7~2-~ g/~
Poor Quality Original - Pages:
Other- Pages:
DIGITAL DATA
[3 Diskettes, No.
[3 Other, No/Type
OVERSIZED
[3 Logs of various kinds
[3 Other
Complete
COMMENTS:
Scanned by: Beverly Mildred Daretha ~Lowell
TO RE-SCAN
Notes:
Re-Scanned by: Beverly Mildred Daretha~owell
Date:
-~~~RECEIVED
STATE OF ALASKA
ALASK~IL AND GAS CONSERVATION COM SlON APR 0 2 2008
WELL COMPLETION OR RECOMPLETION REPORT AND LOG
Alaska Oil & Gas Corrs. Commission
1a. Well Status: ^ Oil ^ Gas ^ Plugged ®Abandoned ^ Suspended
zoAACZS.~os 2oAAC2s.»o
^ GINJ ^ WINJ ^ WDSPL ^ WAG ^ Other No. of Completions Zero 9b. Well Clas
®Development ^ Exploratory
^ Service ^ Stratigraphic
2. Operator Name:
BP Exploration (Alaska) Inc. 5. Date Comp., Susp., or Aba
3/4/2008 •~ 12. Permit to Drill Number
198-123 ~ 306-386
3. Address:
P.O. Box 196612, Anchorage, Alaska 99519-6612 6. Date Spudded
10/31/1998 13. API Number
50-029-22896-00-00
4a. Location of Well (Governmental Section):
Surface:
' F
'
S 7. Date T.D. Reached
11/12/1998 14. Well Name and Number:
PBU P2-08 -
18
F
L, 1073
WL, SEC. 11, T12N, R14E, UM
Top of Productive Horizon:
3014' FSL, 710' FWL, SEC. 07, T12N, R15E, UM
8. KB (ft above MSL): 49.02'
Ground (ft MSL): 11.08'
15. Field /Pool(s):
Prudhoe Bay Field /Point
Total Depth:
3091' FSL, 923' FWL, SEC. 07, T12N, R15E, UM 9. Plug Back Depth (MD+TVD)
15932 9181 McIntyre Pool
4b. Location of Well (State Base Plane Coordinates, NAD 27):
Surface: x- 681308 y- 5998596 Zone- ASP4 10. Total Depth (MD+TVD)
15971 ~ 9203 - 16. Property Designation:
ADL 365548
TPI: x- 691425 y- 6001844 Zone- ASP4
Total Depth: x- 691636 y- 6001927 Zone- ASP4 11. SSSV Depth (MD+TVD)
N/A 17. Land Use Permit:
18. Directional Survey ^ Yes ®No
Submit electronic and rinted information er 20 AAC 2 .050 19. Water depth, if offshore
N/A ft MSL 20. Thickness of Permafrost (TVD):
1800' (Approx.)
21. Logs Obtained (List all logs here and submit electronic and printed information per 20 AAC 25.071):
MWD, LWD, Gyro, GR / RES /DENS
22. CASING, LINER AND CEMENTING RECORD
CASING SETTING DEPTH MD' SETTING DEPTH TVD HOLE AMOUNT
WT. PER FT. GRADE TOP BOTTOM TOP BOTTOM SIZE CEMENTING RECORD PULLED
20" 133# H-40 41' 110' 41' 110' 30" Driven
9-5/8" 40# L-80 38' 5469' 38' 4950' 12-1/4" 591 sx CS III, 459 sx'G', 877 sx CS III
7" 26# / 29# L-80 113Cr 35' 14874' 35' 8636' 8-3/4" 250 sx Class 'G'
4-1/2" 12.6# 13Cr 14591' 15971' 8522' 9203' 6" 435 sx Class 'G'
23. Open to production or inject ion? ^ Yes ®No 24. TU81NG RECORD
If Yes, list each interval open
(MD+TVD of Top & Bottom; Perforation Size and Number): SIZE DEPTH SET MD PACKER SET MD
3-1/2", 9.2#, 13Cr 14594' 14546'
MD TVD MD TVD
'~ ~ by ~ ~ ^oA~
r
1 25. ACID, FRACTURE, CEMENT SQUEEZE, ETC.
~,/
VDC,i
@~Itdo1
H i L U DEPTH INTERVAL MD AMOUNT & KIND OF MATERIAL USED
15726' Set Whipstock
15726' P&A w/ 12 Bbls Cement
26. PRODUCTION TEST
Date First Production:
Not on Production Method of Operation (Flowing, Gas Lift, etc.):
N/A
Date Of Test: HOUrS Tested: PRODUCTION FOR
TEST PERIOD OIL-BBL: GAS-MCF: WATER-BBL: CHOKE SIZE: GAS-OIL RATIO:
Flow Tubing
PreSS. Casing PreSS: CALCULATED
24-HOUR RATE OIL-BBL: GAS-MCF: WATER-BBL: OIL GRAVITY-API (CORK):
27. CORE DATA Conventional Core(s) Acquired? ^ Yes ®No Sidewal l Cores Ac uired? ^ Yes ®No
If Yes to either question, list formations and intervals cored (MD+TVD of top and bottom of each), and summarize lithology and presence of oil, gas or water
(submit separate sheets with this form, if needed). Submit detailed descriptions, core chips, photographs and laboratory analytical results per 20 AAC 250.071.
t~1...,~L~,i}p~ '
None `~~..~
.r v
t
.. nw..`.'.'ww.+w..
Form 10-407 Revised 02/2007 ~ ~ ~ ~ ~\ I j'~ C~NTINUED ON REVERSE SIDE
V H L ~~, MAID ~ 20DB ~~3
28. GEOLOGIC MARKERS (LIST ALL FORMATIONS AN KERS ENCOUNTERED): 29. FORMATION TESTS
NAME TVD Well Teste ^ Yes ®No
Permafrost Top If yes, list intervals and formations tested, briefly summarizing test
results. Attach separate sheets to this form, rf needed, and submit
Permafrost Base detailed test information per 20 AAC 25.071.
Kuparuk, Zone UC1 15694' 9044' None
Formation at Tatal Depth (Name):
30. List of Attachments: Summary of Pre-Rig Work and Daily Drilling Reports, Well Schematic Diagram
31. I hereby certify that the foregoing is true and correct to the best of my knowledge.
Signed Terrie Hubble Title Drilling Technologist Date ~l d _l
PBU P2-08 198-123 306-386 Prepared ByName/Number.• Terrie Hubble, 564-4628
Well Number Drilling Engineer: Sean McLaughlin, 564-4387
Permit No. / A royal No.
INSTRUCTIONS
GeNew+~: This form is designed for submitting a complete and correct well completion report and log on all types of lands and leases in Alaska. Submit a
well schematic diagram with each 10-407 well completion report and 10-404 well sundry report when the downhole well design is changed.
IreM 1a: Classification of Service Wells: Gas Injection, Water Injection, Water-Alternating-Gas Injection, Salt Water Disposal, Water Supply for Injection,
Observation, or Other. Multiple completion is defined as a well producing from more than one pool with production from each pool completely
segregated. Each segregated pool is a completion.
IreM 4b: TPI (Top of Producing Interval).
IreM 8: The Kelly Bushing and Ground Level elevation in feet above mean sea level. Use same as reference for depth measurements given in other
spaces on this form and in any attachments.
IreM 13: The API number reported to AOGCC must be 14 digits (ex: 50-029-20123-00-00).
IreM 20: Report true vertical thickness of permafrost in Box 20. Provide MD and TVD for the top and base of permafrost in Box 28.
IreM 22: Attached supplemental records for this well should show the details of any multiple stage cementing and the location of the cementing tool.
IreM 23: If this well is completed for separate production from more than one interval (multiple completion), so state in item 1, and in item 23 show the
producing intervals for only the interval reported in item 28. (Submit a separate form for each additional interval to be separately produced,
showing the data pertinent to such interval).
IreM 26: Method of Operation: Flowing, Gas Lift, Rod Pump, Hydraulic Pump, Submersible, Water Injection, Gas Injection, Shut-In, or Other (explain).
IreM 27: Provide a listing of intervals cored and the corresponding formations, and a brief description in this box. Submit detailed description and analytical
laboratory information required by 20 AAC 25.071.
IreM 29: Provide a listing of intervals tested and the corresponding formation, and a brief summary in this box. Submit detailed test and analytical laboratory
information required by 20 AAC 25.071.
Form 10-407 Revised 02/2007 Submit Original Only
~I.~L~I~ • • Page 1 of 2
Well History
Well Date Summary
P2-08 1/20/2008 *** WELL SI ON ARRIVAL *** (Pre PPPOTS)
DRIFT W/ 6' x 2.75" DRIFT, 11' x 2.625" STEM & 2.72" SWAGE (21.95' OAL) TO 2380'-2490'
SLM..PARRAFIN ON TOOLS
BRUSH & FLUSH W/ 3 1/2" BL-BRUSH & 2.25" G. RING FROM SURFACE TO 15800' SLM WHILE LRS
PUMPED HOT DIESEL /CRUDE. DRIFTED 6 "SWAGE
(21.95' OAL) . S/D C~ 15,832' SLM(TARGET 15,800'). NO PROBLEMS ENCOUNTERED W/ DRIFT...
(WHIPSTOCK TO BE SET ~ 15,726') RIH TO SET PLUG
*** JOB IN PROGRESS/ CONT ON 1-21-08 WSR ***
P2-OS 1/20/2008 T/I/0=1175/2500/200 Assist Slickline (Pre-CTD) -Slickline bled IAP from 2500 psi to 20 psi in 30 mins,
all gas. Pumped as directed down Tbg w/61 bbls 180*F diesel, 129 bbls 190*F crude, Slickline RIH
w/brush. FWHP's=1000/80/160.
P2-08 1/21/2008 T/I/0=1000/80/180 Temp=Sl Assist Slickline, MIT IA PASSED to 3000 psi MITT (TTP) FAILED to 3000
psi (Pre CTD) -Pumped downTbg w/26 bbls crude to assist slickline getting downhole to set TTP.
Pumped 20 bbls to test TTP to 3000 psi, Failed, LLR 1 bpm ~ 3000 psi. Slickline to re-run plug
MIT IA PASSED to 3000 psi Pressured up IA from 20 psi to 3000 psi w/6.7 bbls 40*F crude. IA lost 100
psi in 1st 15 min. IA lost 40 psi in 2nd 15 min. Passed, bleed IAP, all fluid ~6 bbls. Tag well, verify casing
valves open to gauges & notify operator. Slickline still on well. Final WHP's=980/60/140
P2-08 1/21/2008 *** CONT FROM 1-20-08 WSR *** (pre PPPOT)
SET 2.813 XX PLUG IN X-NIP ~ 14,534'...PLUG NOT HOLDING
LRS MIT-IA TO 3000 PSI ***** PASSED *****
PULLED 2 813 XX PLU FROM 14 ~i'~4' SI M PLUG Fi n i C)F Sawn Fni ini i~ir~r ~n v Nnr nni
SEAT
SET 2.813 XX PLUG IN TRSSSV ~ 1958' SLM. ** LRS WILL TEST PLUG. ****** SITP 1000 PSI ********
*** WELL LEFT SI, DSO NOTIFIED OF WELL TATUS ***
P2-08 1/22/2008 T/I/0=900/120/180 MIT T PASSED to 2000 psi (Pre CTD) Pressured upTbg to 2000 psi with 0.2 bbls
crude. MIT T lost 6ir~ ist i3 minu essi 2nd 15 minutes for a total loss of 80 psi during 30
minute test. Bled Tbg to 100 psi. FWHP's=100/120/180.
Annulus valves open to gauges.
P2-08 1/26/2008 T/I/O = 50/100/230. Temp = SI. T, IA & OA FL (pre CTD). AL line SI C~? casing valve. ALP = 2430 psi.
TBG FL near surface. IA FL @ surface. OA FL @ surface.
P2-08 1/27/2008 T/I/O = 60/90/220. Temp = SI. Bleed WHP's to 0 psi (pre CTD). AL line SI C~ casing valve. ALP = 2430
psi. TBG FL near surface. IA & OA FL ~ surface. Bled TBGP to 0 psi in 20 min into BT. Bled IAP to 0 psi
in 15 min into BT. Bled OAP to 0 psi in 40 min. Monitored pressures for 30 min. IAP increased to 5 psi.
OAP increased to 140 psi. Bled IAP to 0 psi in 1 min. Bled OAP to 0 psi in 45 min. Monitored pressures
for 30 min. OAP increased 160 psi. Final WHPs = 0/0/160.
P2-O8 2/8/2008 T/IA/OA= 0/0/100 Temp=cold PPPOT-T (PASS) PPPOT- IC (PASS) (Pre CTD)
PPPOT-T RU 2 HP bleed tools onto THA 50 psi to 0 psi, flush void until clean returns achieved.
Pressured to 5000 psi for 30 minute test, 5000/ 15 minutes, 5000/ 30 minutes. Bleed void to 0 psi, RD
test equipment, re installed Alemite cap. Cycle and torque LDS "ET style" all functioned no problems
PPPOT-IC RU 2 HP bleed tools onto IC test void 50 psi to 0 psi. Pressured to 3500 psi for 30 minute test,
3500/ 15 minutes, 3450/ 30 minutes. Bleed IC void to 0 psi, RD test equipment re installed Alemite cap.
Cycle and torque LDS "ET style" all functioned no problems
P2-08 2/13/2008 ***WELL S/I ON ARRIVAL*** (pre sidetrack)
:`PULLED 3-1/2" XX PLUG FROM SSSV NIP C~ 1990' MD
***WELL TURNED OVER TO DSO***
P2-08 2/19/2008 ****WELL SHUT-IN UPON ARRIVAL**** INITIAL WHP = 900/0/200. RAN WHIPSTOCK TO 8000', HAD
TOOL FAILURE DOWN HOLE AND HAD TO POOH. TOOL FAILURE PROVED OUT TO BE THE ERS
TOOL. DURING REPAIRS, PE CALLED AND CANCELLED JOB DUE TO BAD WEATHER
FORCASTED WITHIN THE NEXT FEW HOURS. RDMO, HEAD TO SHOP.
***ATTEMPTED -JOB NOT COMPLETE***
P2-08 2/20/2008 ****WELL SHUT-IN UPON ARRIVAL**** (E-LINE SET WHIPSTOCK). INITIAL T/I/O: 925/0/200.
TROUBLE GETTING DOWN PAST 8400' DUE TO DEVIATION, CALL PUMPERS FOR ASSISTANCE.
ORIENTING TOOL IS MALFUNCTIONING, POOH TO INVESTIGATE.
****JOB CONTINUED ON 21-FEB-2008****
P2-08 2/21/2008 T/I/0= 900/40/200 "CTD prep" Assist E-Line Pumped a 3 bbl meth spear followed by 7 bbls crude
followed by 3 bbl meth cap down TBG to help E-line get down hole. Annulus casing valves tagged and
left open on departure. Final WHP= 900/40/200
P2-08 2/21/2008 ****JOB CONTINUED FROM 20-FEB-2008**** (E-LINE SET WHIPSTOCK). T/I/O: 800/0/200. PUMPED
DOWN PAST GLM AT 8447.
aTOP OF WHIPSTOCK WINDOW SET AT 15726', 2' BELOW NEAREST COLLAR. WHIPSTOCK WAS
/IQIC~ITCII T(1 1-Ilf_4-I CIr1C RI IT I'll IQI~I!_ CCTTIAI!'_ TI IQAICrI QA(`l! T(~ CIAI41 /IQICAITATI(1AI !lG 7~
http://digitalwellfile. bpweb.bp.com/Wllnfo/Reports/ReportViewer.aspx 4/1/2008
Digital Well File VI II LIV 1 LV 1 V 1 IIVI I VIVL, VV 1 VVI IIIVV VLI I IIVV 1 VI IIVLV V/"1V 1\ I V 1 II Y/'9L VIII LIY 1/'91IVIY V GJ
LL IN HOLE. CALL FOR Page 2 of 2
DEG LOH LE STUCK IN FLOW TUBES WITH 130' OF LIN
` ~
FULLBOR ILL WELL BEFORE CLOSING WIRELINE VAL ***JOB CONTINUED ON 22-
FEB-2008
P2-08 2/22/2008 T/I/0=1200/0/200 "CTD prep" Assist E-Line. Pumped 307 bbls 1 %kcl and 16 bbls of neat. Pumped 247
bbls of 4% kcl and 24 bbls neat to freeze protect (continued on 2/23/08)
P2-08 2/22/2008 ****JOB CONTINUED FROM 21-FEB-2008**** (E-LINE SET WHIPSTOCK). T/I/O: 900/0/200. E-LINE
CABLE STUCK IN FLOW TUBES WITH 130' STILL IN HOLE. PUMPED 50 BBLS METH BUT DID NOT
FREE CABLE. PUMPED 307 BBL 2%KCL, AND 247 BBL 4%KCL TO KILL WELL, FREEZE
PROTECTED WITH 25 BBL NEAT METH. T/I/O: 500/50/300. ****JOB CONTINUED ON 23-FEB-
2008****
P2-08 2/23/2008 "WSR CONTINUED FROM 08-02-22" "CTD prep" Assist a-line. ANNULUS CASING VALVES OPEN ON
DEPARTURE. FINAL WHP= 400/300/180 E-Line still on well at departure.
P2-08 2/23/2008 ****JOB CONTINUED FROM 22-FEB-2008***" (E-LINE SET WHIPSTOCK). CABLE STUCK IN FLOW
TUBES WITH 130' REMAINING IN HOLE. CLOSED WIRELINE VALVES AND UNSTABBED
LUBRICATOR TO FIX CABLE PROBLEM. ****JOB CONTINUED ON 24-FEB-2008****
P2-08 2/24/2008 ****JOB CONTINUED FROM 23-FEB-2008**** (E-LINE SET WHIPSTOCK) FREED CABLE FROM
FLOWTUBES. FINAL T/I/O: 400/550/200 ****WELL LEFT SHUT IN*`**
***J B COMPLE E`*"
P2-08 2/25/2008 T/I/O = SSV/660/220. Temp = SI. Bleed IAP and OAP to 0 psi (pre-RWO). Flow line connected. A/L
connected (240 psi). IA FL C~ surface. OA FL C~ surface. Bled IAP to 0+ psi in 30 min (1.5 bbls of liquid).
OAP decreased to 180 psi. SI, monitored for 30 min. No change in IAP. Bled OAP to 0+ psi in 15 min.
Maintained open bleed for 45 min with a steady stream of liquid (1.8 bbls). SI, monitored for 30 min. OAP
increased to 160 psi. Final WHPs = SSV/0/160.
Print Date: 4/1/2008 Page 1 of 1
http://digitalwellfile.bpweb.bp.com/Wllnfo/Reports/ReportViewer.aspx 4/1/2008
• •
BP EXPLORATION Page 1 Of 16
Operations Summary Report
Legal Well Name: P2-08
Common Well Name: P2-08 Spud Date: 3/5/2008
Event Name: REENTER+COMPLETE Start: 2/29/2008 End: 3/21/2008
Contractor Name: NORDIC CALISTA Rig Release: 3/21/2008
Rig Name: NORDIC 1 Rig Number:
Date From - To Hours Task Gode NPT Phase Description of Operations
2/29/2008
3/1/2008 00:00 - 01:30
01:30 - 10:30
10:30 - 18:00
18:00 - 00:00
00:00 - 10:30
10:30 - 13:00
13:00 - 18:00 1.50
9.00
7.50
6.00
10.50
2.50
5.00 MOB
MOB
MOB
MOB
BOPSU
BOPSU
BOPSU P
P
P
N
N
N
P
REP
RREP
RREP PRE
PRE
PRE
PRE
PRE
PRE
PRE Install 2" reel.
Move to Pt Mac 2-08. Spot satefite office. Accept rig at 1030.
NU BOP. Complete repair of injector. Install gripper blocks,
stripper, Pipe straightener, & gooseneck. Stand back injector.
RU hard line & flowback tank .Install air compressor.
BOPE test. Swab not holding, grease swab valve; valve not
holding, regrease swab.
ROPE test continues to fail after greasing swap. Troubleshoot
BOPE valves. Change out choke valve #15 and rebuild valve
#3.
Test BOPE after choke valve change. Grease valves with 501
Clare.
Test BOP s 250 psi Lo and 3500 psi hi. Test witnessed by
AOGCC Re Lou Grimaldi.
18:00 - 20:00 2.00 BOPSU P PRE Continue BOP test.
20:00 - 00:00 4.00 RIGU P PRE Pull coil across, fill coil, PT reel hardline and inner reel valve.
Pump slack. Set injector down to pull BPV.
3/2/2008 00:00 - 00:30 0.50 BOPSU P PRE PU lubricator and tools for pulling BPV
00:30 - 01:00 0.50 BOPSU P PRE PJ M for pulling V
01:00 - 02:00 1.00 BOPSU P PRE Pull BPV, 480 si on well. Lay down BPV tools
02:00 - 05:00 3.00 ZONISO P WEXIT MU Kendal CTC and Inteq UOC, PT to 3500
05:00 - 09:00 4.00 ZONISO P WEXIT RIH, adjust skates on injector, Holding 500 psi while RIH to
10000'. Wt check. Up wt 25K. RIH to 15500 Up Wt 38K, RIH
to WS at 15730 un corrected. Paint flag EOP 15621. RIH
Park coil at 15690.
09:00 - 09:15 0.25 ZONISO P WEXIT Shut in well Inject 3/4 bpm ~ 1550 psi,1000 whp, 1/2 bpm
X1165 psi 840 WH.
09:15 - 09:30 0.25 ZONISO P WEXIT PJSM for cementin s ueeze 'ob.
09:30 - 10:00 0.50 ZONISO P WEXIT Circulate at min rate .26 bpm holding 520 psi with closed
choke. Batch u cement 12 bbl 15.8 cement> Pump 5 bbl
H2O. PT line to 3500 psi. K.
10:00 - 11:45 1.75 ZONISO P WEXIT Pump 12 bbl 15.8 ppg cement. 5 bbl H2O and displace with
KCL. 1.5/1.0 bpm ~ 3200-2500 psi holding 500 psi WH
pressure. 40 bbl away 1.45/1.0 3400 psi WH 490 psi, IA321psi
. At 50 bbl slow to .75 bpm. rShutin back side at 51 bls in total.
Bull head ~ .75 bpm X1100, WH 880
at 53 bbls .75 bpm ~ 1475 , W H 1247
at 54 bbls .75 bpm ~ 1775, W H 1542
at 55 bbl .75 bpm ~ 2556 , W H 2373
Lay in 1 for 1 to 15000 worst case
PU to 14500 psi Shut down pump while POH final WH 242psi
Soueeze with .2 bbls to 560 psi WH
off after 20 min
11:45 - 15:00 3.25 ZONISO P WEXIT Pum 35 bbl bio and wash down to 15725. POH
contaminating cement to 14800'. Circulate in second 35 bbl
bio pill. Holding 1500 psi wellhead for total of 3 hrs.
15:00 - 16:20 1.33 ZONISO P WEXIT Continue to circulate out excess cement through an open
choke. Circulate 9.4 milling fluid to nozzle.
16:20 - 16:50 0.50 ZONISO P WEXIT POH to 14075 laying in 9.4 milling fluid.
Printed: 3/27/2008 1:54:21 PM
r~
r1
~ ~
BP EXPLORATION Page 2 of 16
Operations Summary Report
Legal Well Name: P2-08
Common Well Name: P2-08 Spud Date: 3/5/2008
Event Name: REENTER+COMPLETE Start: 2/29/2008 End: 3/21/2008
Contractor Name: NORDIC CALISTA Rig Release: 3/21/2008
Rig Name: NORDIC 1 Rig Number:
bate From - To Hours Task Code NPT Phase Description of Operations
3/2/2008 16:50 - 19:50 3.00 ZONISO N RREP WEXIT Generator turbo overheating. Stopped POH to investigate.
Generator is down for repair. Continues POOH slowly on one
generator. Total trip OOH was 6.5 Hours, normal speeds
would be 3.5 hours. This 3 hours is the NPT time
19:50 - 22:55 3.08 ZONISO P WEXIT Slowly POH at reduced speed and pump rate on one
generator.
22:55 - 23:30 0.58 ZONISO P WEXIT At surface, lay down nozzle and MU stack jetting tool. Jet
stack.
23:30 - 00:00 0.50 ZONISO P WEXIT PT CTC, good to 4000 psi. Anchor on a-line has come loose,
re-install UQC.
3/3/2008 00:00 - 01:00 1.00 STWHIP N DFAL WEXIT Re-install Inteq UQC
01:00 - 01:30 0.50 STWHIP P WEXIT PJSM for PU window milling BHA
01:30 - 02:00 0.50 STWHIP P WEXIT MU window milling BHA
02:00 - 03:30 1.50 STWHIP P WEXIT RIH
03:30 - 06:40 3.17 STWHIP N RREP WEXIT Generator threw a rod. POOH for extensive generator repairs.
06:40 - 07:20 0.67 STWHIP N RREP WEXIT UD milling BHA
07:20 - 08:00 0.67 STWHIP N RREP WEXIT reverse pump 5 bbl McOH into coil.
08:00 - 10:40 2.67 STWHIP N RREP WEXIT Prep for Generator 1 removal. Disconnect generator. drain
radiator. Remove radiator and front panel assembly.
10:40 - 15:15 4.58 STWHIP N RREP WEXIT Sim Ops RU Little Red to pump slack in coil. Pump one CT
volume to warm CT 1 bpm (~ 1800 psi 100F. Pump slack Cut
8' Ct 1' wire. Rd Hot Oil.
Spot stack of matting boards on off driller side. Pull gen set #1
from motor room onto matting boards.
15:15 - 18:00 2.75 STWHIP N RREP WEXIT Remove Gen set from motor room. Remove replacement
generator from connex and stage on matting boards.
18:00 - 00:00 6.00 STWHIP N RREP WEXIT Installing replacement generator
3/4/2008 00:00 - 03:30 3.50 STWHIP N RREP WEXIT Continue generator replacement. Load test generator.
03:30 - 04:00 0.50 STWHIP N RREP WEXIT PU window milling BHA
04:00 - 05:00 1.00 STWHIP N RREP WEXIT RIH, ECD is open, pumping .4 BPM
05:00 - 07:20 2.33 STWHIP P WEXIT Continue to RIH, off NPT time
07:20 - 07:35 0.25 STWHIP P WEXIT Stop RIH to close EDC. EDC would not close.
07:35 - 10:50 3.25 STWHIP N DFAL WEXIT POH from 14519 ft to change EDC.
10:50 - 11:00 0.17 STWHIP N DFAL WEXIT Tagged Surface. SAFETY MEETING--covered procedures,
hazards, and mitigation for LD BHA.
11:00 - 11:55 0.92 STWHIP N DFAL WEXIT Standback injector, LD BHA #3. PU Milling BHA #4, stab
injector.
11:55 - 14:50 2.92 STWHIP N DFAL WEXIT RIH to 300ft, open EDC, pump minimum rate &RIH at 100
fUmin to 6000 ft, RIH at 80 ft/min to 14519 ft.
14:50 - 15:20 0.50 STWHIP P WEXIT RIH from 14519 ft to TOW.
Tag cement at 15,706.
~~
-Q 15:20 - 16:20 1.00 STWHIP P WEXIT Mill cement from 15,706-15708'. Not a steady ROP to
determine start of window milling.
Decide to log CCL tie-in for better depth control.
16:20 - 17:00 0.67 STWHIP P WEXIT Log CCL tie-in. Added 19.5'to CTD.
17:00 - 00:00 7.00 STWHIP P WEXIT RIH. Tagged bottom at 15726.4'.
Mill window, top of whipstock was set at 15726' with a 29 Deg
LOHS tray.
Free spin 1.45 bpm ~ 3750 CTP
Mill with 1.45 bpm ~ 3950 CTP at ~ 1'/hour
15731.5' stalled at 23:30, continue time milling
15733' at midnight
3/5/2008 00:00 - 00:30 0.50 STWHIP P WEXIT Continue milling operations, 15733', 1.45 bpm ~ 3950 CTP.
P~
Printetl: 3/27/2008 1:5427 NM
TREE = FMC
WELLHEAD = CIW
ACTUATOR = BAKER C
KB. ELEV =
BF. ELEV =
KOP = 2933'
Max Angle = 93 @ 16,682'
Datum MD = 15330'
Datum TVD = 8800' SS
DRLG DRAFT
9-5/8" CSG, 40#, L-80, ID = 8.835" 5469'
Minimum ID = 1.87" @ 16435'
O-RING SUB, FLOAT CLR, DN SUB
I 7" CSG, 26#, L-80, ID = 6.276" I
TOP OF 2-3/8" 13cr80 LNR
3-1/2" TBG, 9.2#, 13CR, .00914 bpf, ID = 3.068" ~ 14594'
TOP OF 4-1/2" LNR 14591'
EST. TOC 14760'
7" CSG, 29#, L-80, ID = 6.184" 14874'
Mechanical Whipstock 15726'
PERFORATION SUMMARY
REF LOG:
A NGLE AT TOP PERF: 92° @ 16586'
Note: Refer to Production DB for historical perf data
SIZE SPF INTERVAL Opn/Sqz DATE
2-3l8" 16586 - 17505 O 03!17/08
SLOTTED LNR
PBTD ~ 15932
4-1/2" LNR, 12.6#, 13Cr, 0.0152 bpf, ID = 3.958" 15971
P2-08A
1990' '1 3-1/2", HES SERIES 10, TRSSSV, ID = 2.81"
CAS LIFT MANDRELS
ST MD TVD DEV TYPE VLV LATCH PORT DATE
1 4198 4049 38 FMHO DMY RK 0 01/17/07
2 5464 4947 45 FMHO DMY RK 0 11 /21 /98
3 8447 6096 75 FMHO DMY RK 0 07/17/99
4 10525 6891 64 FMHO DMY TG 0 01/17/07
5 12470 7696 69 FMHO DMY RK 0 11 /21 /98
6 14207 8375 65 FMHO DMY RK 0 11/21/98
7 14482 8482 68 FMHO DMY TG 0 01/17/07
14546' ~ 7" X 3-1/2" BAKER S-3
14571' 3-1/2" HES X NIP, ID= 2.81"
14582' 3-1/2" HES XN NIP, MILLED ID = 2.80"
14593 ~~ 3-1/2" WLEG
14596' ELMD TT LOGGED 08/30/99
I BOTTOM OF CEMENT
I 16435' I
out to 1.87"
2-3/8" 13Cr80 cemented/slotted liner I~ 17506'
DATE REV BY COMMENTS DATE REV BY COMMENTS POINT MCINTYRE UNfT
12/08!98 ORIGINAL COMPLETION WELL: P2-08A
03/21/08 NORDICI CTD SIDETRACK PERMfT No: 2061690
API No: 50-029-22896-01
SEC 11 T12N R14E 3858.04 FEL 2188.45 FNL
BP Exploration (Alaska)
10ir-rd~
07/27/07
SCbluIDbBPg8P
RECEJVEE)
NO. 4346
Alaska Data & Consulting Services
2525 Gambell Street, Suite 400
Anchorage, AK 99503-2838
A TTN: Beth
JUL 3 0 ZOO]
Company:
State of Alaska
Alaska Oil & Gas Cons Comm
Attn: Christine Mahnken
333 West 7th Ave, Suite 100
Anchorage, AK 99501
Alast;a on & Gas Cons. CommissiQn
. Anchorage SCANNED AUG 0 1 2007
Field: Prudhoe Bay
Endicott
Well Job# Loa DescriDtion Date BL Color CD
3·25/L-27 11686762 STATIC PRESSURE SURVEY 07/09/07 1
4-18/5-30 11813062 STATIC PRESSURE SURVEY 07/10/07 1
2-50/U-08 11676953 LDL 07/13/07 1
1-61/Q-20 11695066 SBHP SURVEY 07/13/07 1
3-41/K-39 11846795 WFL & PRESS GRADIENT 07/17/07 1
1-41/0-23 11695068 INJECTION PROFILE 07/24/07 1
3-41/K-39 11846795 IPROF & JEWELRY 07/16/07 1
L 1-09 11626109 LDL 06/27/07 1
02-308 11626108 LDL 06/25/07 1
H-D7 A 11637346 LDL 06/30/07 1
12-05A 11638649 FPIT 07/04/07 1
12-12A 11661162 MEM STATIC TEMP/JEWELRY 07/05/07 1
P2-08 11686761 STATIC PRESSURE SURVEY 07/05/07 1
17-02 11745227 MEM GLS 07/10/07 1
09-11 11686765 STATIC PRESSURE SURVEY 07/11/07 1
X-19B 11801075 LDL 06/19/07 1
MPK-30 11676952 FPIT 07/12/07 1
11-08 11813061 STATIC PRESSURE SURVEY 07/07107 1
03-14A 11849926 BHP SURVEY 07/25/07 1
01-16 11630486 PROD PROFILE 06/28/07 1
MPH-17 11813063 CBL & IMAGE LOG 07/21/07 1
01-15A 11849924 USIT 07/20/07 1
02-30B 11813058 USIT 07/04/07 1
MPJ-24 11638647 USIT 06/29/07 1
E-101 11630488 PRODUCTION PROFILE 06/30/07 1
G-18A 11209612 MCNL 07/19/06 1 1
.
.
PLEASE ACKNOWLEDGE RECEIPT BY SIGNING AND RETURNING ONE COPY EACH TO:
BP Exploration (Alaska) Inc.
Petrotechnical Data Center LR2-1
900 E. Benson Blvd.
Anchorage, Alaska 99508
Date Delivered:
Alaska Data & Consulting Services
2525 Gambell Street, Suite 400
Anchorage, AK 99503-2838
ATTN: Beth
Received by:
dlP
·
j~
.'
.t
¡
j
SARAH PALIN, GOVERNOR
¡
J
,
l
333 W. 7" AVENUE, SUITE 100
ANCHORAGE, ALASKA 99501-3539
PHONE (907) 279-1433
FAX (907) 276-75423
AlASKA OIL AND GAS ¡
J
CONSERVATION COl\fl\lISSION ¡
Sean McLaughlin
CT Drilling Engineer
BP Exploration (Alaska) Inc.
PO Box 196612
Anchorage, AK 99519-6612
'" \....-;.
'C f,""'''')~''''
'::~.\~":'~~; ',\'
iL:
Re: Prudhoe Bay Field, Pt McIntyre Oil Pool, P2-08
Sundry Number: 306-386
\yGt~'~
Dear Mr. McLaughlin:
Enclosed is the approved Application for Sundry Approval relating to the
above referenced well. Please note the conditions of approval set out in the
enclosed form.
When providing notice for a representative of the Commission to witness any
required test, contact the Commission's petroleum field inspector at (907)
659-3607 (pager).
As provided in AS 31.05.080, within 20 days after written notice of this
decision, or such further time as the Commission grants for good cause
shown, a person affected by it may file with the Commission an application
for rehearing. A request for rehearing is considered timely if it is received by
4:30 PM on the 23rd day following the date of this letter, or the next working
day if the 23rd day falls on a holiday or weekend. A person may not appeal
a Commission decision to Superior Court unless rehearing has been
requested.
Sincerely,
n .
Chairman
DATED this~ayofDecember, 2006
Encl.
!'i')aWi'~ì¡O&. Æf? ):J..)~/~ . /I¥L R~fV~tl°~
f 1 I () STATE OF ALASKA U'-r ~ "W
ALASKA Oil AND GAS CONSERVATION COMMISSION ",,,, DEC 0 7 2006
VJ f7:J i l.ll ¿/ ¡;
APPLICATION FOR SUNDRY APPROVAL
20 AAC 25 280
Alaska Oil & Gas Cons. Commission
. .
1. Type of Request: 181 Abandon o Suspend o Operation Shutdown o Perforate o Time Extension v
o Alter Casing o Repair Well o Plug Perforations o Stimulate o Re-Enter Suspended Well
o Change Approved Program o Pull Tubing o Perforate New Pool o Waiver o Other
2. Operator Name: 4. Current Well Class: / 5. Permit To Drill Number
BP Exploration (Alaska) Inc. 181 Development D Exploratory 198-123 /
3. Address: D Stratigraphic D Service 6. API Number: /'
P.O. Box 196612, Anchorage, Alaska 99519-6612 50-029-22896-00-00
7. If perforating, closest approach in pool(s) opened by this operation to nearest 8. Well Name and Number:
property line where ownership or landownership changes: PBU P2-08 /"
Spacing Exception Required? DYes 181 No
9. Property Designation: 110. KB Elevation (ft): 11. Field I Pool(s):
ADL 365548 49.02' Prudhoe Bay Field / Point Mcintyre Pool
1~3;(:>..· .....; ',/ .' . ...i;/ ....> I '/('/f( ···if,.. ./i ";" i....;/ii ; ii/;i.; ··i·;··'·';;;;.:
Total Depth MD (ft): Total Depth TVD (ft): Effective Depth MD (ft): Effective Depth TVD (ft): Plugs (measured): Junk (measured):
15971 9203 15932 9181 None None
Casino Lenoth Size MD / TVD Burst Collacse
Structural
Conductor 69' 20" 110' 110'
Surface 5431' 9-5/8" 5469' 4950' 5750 3090
Intermediate 14839' 7" 14874' 8636' 7240 5410
Production
Liner 1380' 4-1/2" 14591' -15971' 8522' - 9203' 8430 7500
Perforation Depth MD 7/ I Perforation Depth TVD (ft): I Tubing Size: Tubing Grade: Tubing MD (ft): .
15700' - 15790' 9047' - 9099' 3-1/2",9.2# 13Cr 14593' ./
Packers and SSSV Type: 7" x 3-1/2" Baker 'S-3' packer packers and SSSV MD (ft): 14546' /
13. Attachments: 14. Well Class after proposed work: /
181 Description Summary of Proposal D BOP Sketch D Exploratory 181 Development D Service
D Detailed Operations Program /'¡
15. Estimated Date for Januaj1, i007 16. Well Status after proposed work:
Commencin¡:¡ Operations: 181 Oil DGas D Plugged D Abandoned
17. Verbal Approval: Dat~ DWAG DGINJ DWINJ D WDSPL
Commission Representative:
18. I hereby certify that the foregoing is true and correct to the best of my knowledge. Contact Sean McLaughlin, 564-4387
Printed Name ..sean McLaughlin Title CT Drilling Engineer
S-/7tI\ t ~ 1Z-./7/ob Prepared By Name/Number:
Signature Phone 564-4387 Date Terrie Hubble, 564-4628
r Commission Use Onlv I
I Sundry Number: (~O - P>9>(1)
Conditions of approval: Notify Commission so that a representative may witness
D Plug Integrity ØBOP Test D Mechanical Integrity Test D Location Clearance
Other: T 't-~ t- ßorE to ~SOO fLt' .
Subsequent Form Required: 1C?-~A
Date /2 ~/'2- ,..t>6
T A~"~ APPROVED BY
Approved By: SIONER THE COMMISSION
Form 10-403 Revised 06/2006 - J Submit In Duplicate
ORIGINAL
RBDMS BFt DEC 1 :i 2006
.
.
To:
Winton Aubert, Petroleum Engineer
Alaska Oil & Gas Conservation Commission
Sean McLaughlin
CTD Engineer
December 5,2006
Prep P2-08 for CTD sidetrack
bp
From:
Date:
Re:
Sundry approval is requested to prepare P2-08 for a sidetrack. Drilled on the eastern periphery and completed with
3-1/2" tubing, this well tried to miss the edge of the UB3 as it was felt that the UB3 would be swept between P2-28i
and P2-32. A thin section ofUB3 was encountered at the very top of the reservoir section. Fearing rapid water
breakthrough, a conservative perforation strategy was pursued with 20' of perforations in the lower UBl-2. BOL
Dec 98 but low rates and frequent paraffin build-up were experienced. Obtained a PBU and perforated additional
UB 1-2 with StimTUBE in July of '99. No change in productivity. Added more UB 1-2 perfs 8130/99 (Upper UB 1-
2) and eventually achieved a sustainable flow rate. UB3 perforations were added 2/02 in addition to reperforating
(UBl-2 & LC4) and the well was tested once prior to being shut in for an extended period of time. In August '05 we
attempted to obtain an SBHP. Hydrates were encountered in the well at p ximately 1,000'. Hot oil job was
perfonned and the well was POPPED on 8/9/05. Well tests indicated ERY igh watercuts. A shakeout was pulled
on August 19th to confinn the very high density readings (.995-.998) s ed during well testing. A 98% watercut
was the result of the shakeout. Well was SI 9/13/05 due to water han mg constraints at GC 1. Well was produced
for a more extended period from December '05 until the 24" commonline was shut-in in April '06. Again, well tests,
well test densities, and shakeouts all confinn that the well is a very high WC producer (>98%). A SBHP was
obtained in June '06 showing a pressure of 4069 psi at the field datum. The well is currently shut-in.
P2-08 has been selected for a through tubing sidetrack with the SLB/Nordic 1 Coiled Tubing Drilling rig on or
around March 1, 2007. -The sidetrack, P2-08A, will exit the existing 4-1/2" liner from a whipstock and will target a
crosscut of the UBl-2 sands. The existing perforations will be isolated by a cement plug. The following describes
work planned and is submitted as an attachment to Fonn 10-403. A schematic diagram of the proposed sidetrack is
attached for reference.
~
~
~
~
~
ÇJ
""'
Pre-Rig Work:
1. S DummyGLV's
2. F MIT-IA, and OA.
3. C Mill XN nipple to 2.8", Drift to 15,800'
4. C Caliper from 15,800'
5. C If caliper indicates reduced ID in the 4-1/2" tubing underream from 15650' -15 800'
6. C Dummy WS drift to 15800'
7. 0 Set BPV
8. 0 AC-LDS; AC-PPPOT -IC, T
9. 0 Test MV, SV, WV
10. 0 Install accumulator for TRSSSV
11. 0 Bleed gas lift and production flowlines down to zero and blind flange
12. 0 Remove wellhouse, level pad
The pre CTD work is slated to begin on January 01,2007.
~
~
~
V)
~
l-
i
Rig Work:
1. MIRU and test BOPE to 250 psi low and 3500 psi high.
2. Pull BPV
3. Set the 3-1/2" x 4-1/2" TTWS at 15726'. Refe~e Log: Perforating Record from 12/8/98
4. Cement squeeze perforations -15.8 ppg cmt ' bbl)
5. Mill 2.8" window at 15726' and 10' ofopenho e. Swap the well to Flo-Pro.
6. Drill Build: 3" OH, 134' (30 deg/100 planned)
7. Drill Lateral: 3" OH, 2540' horizontal (12 deg/100 planned) - include resistivity
8. Run 23/8" solid/slotted Bonzai completion leaving TOL at 14561'
9. Pump primary cement job to TOL, 15 bbl of 15.8 ppg expansive liner cmt planned
10. Test liner lap to 2000 psi.
.
11. Cleanout run to mill baffle plate
12. Run MCNL/GR/CCL log
13. Freeze protect well, Set BPV, RDMO
.
Post-Ri2 Work
1. Pull BPV
2. Install well house. Hook up flow line.
Sean McLaughlin
CTD Drilling Engineer
564-4387
CC: Well File
Sondra Stewman/Terrie Hubble
TREE =
WELLHEAD =
ACTUA TOR =
KB. ELEV =
BF. ELEV =
KOP=
Max Angle =
Datum MD =
Datum lVD =
FMC
crvv
BAKER C
2933'
75 @ 8469'
15330'
8800' SS
.
P2-08
9-5/8" CSG, 40#, L-80, ID = 8.835" I
Minimum ID = 2.750" @ 14582'
3-1/2" HES XN NIPPLE
7" CSG, 26#, L-80, ID = 6.276" I
3-1/2" TBG, 9.2#, 13CR, .00914 bpf, ID = 3.068" I 14594'
I TOP OF 4-1/2" LNR H 14591'
.
.1 SAFETY NOTES: HORIZONTAL WELL
1990' -i 3-1/2", HES SERIES 10, TRSSSV, ID = 2.81" I
GAS LIFT MANDRB...S
ST MD lVD DEV TYPE VLV LATCH PORT DATE
1 4198 4049 38 FMHO RK
2 5464 4947 44 FMHO RK
3 8447 6096 75 FMHO RK
4 10525 6891 64 FMHO RK
5 12470 7696 69 FMHO RK
6 14207 8375 65 FMHO RK
7 14482 8482 68 FMHO TG
14546' -i 7" X 3-1/2" BAKER S-3 I
14571' -i 3-1/2" HES X NIP, ID = 2.81" I
14582' -i 3-1/2" HES XN NIP, ID = 2.75" I
14593' -i 3-1/2" WLEG I
14596' H ELMD TT LOGGED 08/30/99
7" CSG, 29#, L-80, ID = 6.184" I
PERFORATION SUMMARY
REF LOG: GR-RES ON 11/12/98
ANGLE AT TOP PERF: 55 @ 15730'
Note: Refer to Production DB for historical perf data
SIZE SPF INTERVAL Opn/Sqz DATE
2-1/2" 6 15700-15720 0 02/23/02
2-1/2" 6 15730-15750 0 08/30/99
2-1/2" 6 15730-15775 0 02/23/02
2-1/2" 6 15750-15755 0 01/11/99
2-1/2" 6 15755-15775 0 12/08/98
2-1/2" 6 15785-15790 0 01/11/99
2-1/2" 6 15785-15790 0 02/23/02
DATE
12/08/98
11/20/00
02/22/01
09/15/01
02/23/02
REV BY
SIS-lsl
SIS-MD
RNlTP
JAF/KK
I PBTD I 15932'
14-1/2" LNR, 12.6#, L-80, 0.0152 bpf, ID = 3.953" H 15971'
COMMENTS
ORIGINAL COMPLETION
CONVERTED TO CANVAS
FINAL
CORRECTIONS
AD/REPERFS
DATE
REV BY
COMMENTS
POINT MCINTYRE UNIT
WELL: P2-08
PERMIT No: 98-123
API No: 50-029-22896-00
SEC 11 T12N R14E 3858.04 FEL 2188.45 FNL
BP Exploration (Alaska)
FMC
RK
RK
RK
TG
7"X
2·1/2"
2-1/2"
2-1/2"
2·1/2"
2-1/2"
2-1/2"
PERFORA TION SUtv1MA RY
REF LOG: GR-RES ON 11/12/98
ANGLE AT TOP PERF: 55 @ 15730'
Note: Refer to Production historical
SPF
6
6
6
6
6
6
6
o
o
o
o
o
o
o
02/23/02
08/30/99
02/23/02
01/11/99
12/08/98
01/11/99
02/23/02
15700-15720
15730-15750
15730-15775
15750-15755
15755-15775
15785-15790
15785-15790
STATE OF ALASKA
ALASKA OIL AND GAS CONSERVATION COMMISSION
REPORT OF SUNDRY WELL OPERATIONS
1. Operations performed: Operation shutdown_~ Stimulate _ Plugging _ Perforate _X
Add Perf./RePerfs Pull tubing _ Alter casing _ Repair well _ Other _
2. Name of Operator 5. Type of Well: 6. Datum elevation (DF or KB feet)
BP Exploration (Alaskal, Inc: Development_.X RKB 49 feet
3. Address E~lorato~y_ 7. Unit or Property name
P. O. Box 196612 Stratlgraphlc_
Anchorage, AK 99519-6612 .... Service_ Point Mclnt~re U nit
4. Looatlon of well at surface 8. Well number
5261' FNL, 4207' FEL, Sec. 11, T12N, R14E, UM (asp'$ 681308, $988596) P2-08
At top of productive Interval '"9. Permit number / approval number
2242' FNL, 896' FEL, Sec. 07, T12N, R15E, UM (asp's 694600, 6001950) 198-1230
At effective depth 10. APl number
2198' FNL, 3886' FEL, Sec. 07, T12N, R15E, UM (asp's 691608, 6001917) 50-029-22896
At total depth 11. Field / Pool
2236' FNL, 3989' FEL, Sec. 07, T12N, R15E, UM (asp's 691507, 6001876) Point MclntTre Oil Pool
12. Present well condition summap/
Total depth: measured 15971 feet Plugs (measured) TD Tag @ 15801' (02/21/2002).
true vertical 9203 feet
Effective depth: measured 15801 feet Junk (measured)
true vertical 9105 feet
Casing Length Size Cemented Measured Depth True Vertloal Depth
Conductor 110' 20" Driven 110' 110'
1544 sx ColdSet III &
Surface 5485' 9-5/8" 5485' 4962'
456 sx 'G'
Production 14500' 7" 271 sx Class 'G' 14500' 8488'
Liner 1350' 4-1/2" 345 ex Claes 'G' 15971' 9203'
Perforation depth: measured Open Parrs 15700'-15720', 15730'-15775', 15785'-1579o,.RECEIVED
truevertlcal Open Perfs 904e'- 9060', 9065'- 9090', 9096'- 9090' MAR 0 ? 200~
Tubing (size, grade, and measured depth) 3-1/2", 9.2#, 13-CR TBG O 14594'. Alaska011&GasCons. C0mmission
Anchorage
Packers & SSSV (type & measured depth) 7" x 3-1/2" Baker S-3 Packer O 14594'.
3-1/2" HES Series 10 TRSSSV ~ lgg0'.
13. Stimulation or cement squeeze aummmy
Intervals treated (measured) (see at~ached)
Tr~tment description including volumes used and final pressure
14. Representative Dally Avereoe Production ~"i'~lectl~ Data ........
OiI-Bbl Ges-Mcf Water-Bbl Casing Pressure Tubing Pressure
Pdor to well operation 02/01/2002 Shut-In
Subsequent to operation 03/06/2002 Shut-In
15. Attachments 16. Status of well classification as:
Copies of Logs and Surveys run _
Daily Report of Well Operations ~ Oil _X Gas _ Suspended ~ Service
17. I hereby certify that the foregoing.is t~ue and correct to the best of my knowledge.
DeWa~me R. 8ehnorr Prepared by DsWalme R, S~hnorr 584-5174
Form 10-404 Rev 06/15/88
ORIGINAL
SUBMIT IN DUPLICATE
01/16/2002
01/29/2002
01/30/2002
02/21/2002
02/22/2002
02/23/2002
01/16/02
01/29/02
01/30/02
0W21~2
0W2W02
02/23/O2
P2-08
DESCRIPTION OF WORK COMPLETED
NRWO OPERATIONS
PERF(ADD-PERF): D/T W/2.50" D-GUN (PRE-APERF)
PERF(ADD-PERF): PERFORATING
PERF(ADD-PERF): PERFORATING
PERF(ADD-PERF): 3EWELRY LOG--DEPTH CONTROL; PERFORATING
PERF(ADD-PERF): 3EWELRY LOG--DEPTH CONTROL; PERFORATING
PERF(ADD-PERF): 3EWELRY LOG--DEPTH CONTROL; PERFORATi[NG
EVENT SUMMARY
DRIFT TBG & TAG FILL W/11' LONG 2-1/2" DUMMY GUN & TEL @ 15,936' CD.
(TOOLS FELL SLOWLY) *** WELL TO REMAIN SHUT IN ***
RU SWS. PJSM. PRESSURE TEST TO 500/3000 PSI. OK. RIH WITH CCL,
WEIGHT, ROLLERS, PERF GUN (2.5 PJ @ 6 SPF - 20' OF GUNS), ROLLERS.
TOOLS WOULD NOT FALL PAST 8410'. MADE SECOND ATTEMPT WITH
ADDITIONAL ROLLERS AND FLEX. AGAIN TOOL STOPPED AT 8410'. RU
LITTLE RED PUMPING SVC AND TRIED PUMPING TOOL DOWN HOLE
WITHOUT SUCCESS. RDMO LITTLE RED AND SWS.
ATTEMPT TO PERF. RIH W/THREE DIFFERENT TOOL CONFIGURATIONS.
RAN W/VARIOUS CONFIGURATIONS OF ROLLERS, FLEX JOINT, SWlVLES, &
GUN LENGTHS. ATTEMPTED TO PUMP GUNS IN WELL (TIGHT WELL UNABLE
TO ESTABLISH ACCEPTABLE PUMP RATE). SET DOWN @ 8440' ELM (GLM #3)
ON EACH RUN. NOTIFY PAD OPER OF STATUS. WELL LEFT SHUT IN.
RIH WITH PDS MEM LOG, GR/CCL. WELL SHUT-IN. NO PROBLEM PAST GLM
#3 @ 8447'. START DOWN LOG @ 15400' CTD, RIH AT 30 FPM TO TAG HIGH
@ 15768' CTD (DN WT), 15758' (UP WT). BOTTOM REPERF SHOT IS @ 15790',
LOG UP HOLE, STOP TO PLACE FLAG @ 15675' CTD ELECTRONIC,
CONTINUE TO LOG UP TO 15400' CTD. POOH (PULLED SLOW AND HEAVY).
GOOD LOG DATA, CORRECTED TAG IS @ 15801'. ENOUGH DEPTH FOR ALL
SHOTS.
TIE IN MEMORY LOG- CORRECTED EOP AT FLAG DEPTH - 15707.5'. RIH,
SHOOT TCP 2.5" HSD 6 SPF GUNS, INTERVALS - 15770' - 15775', 15785' -
15790'. MAKE UP GUN #2, RIH, CORRECT AT FLAG, SHOOT 15750' - 15770'.
POOH, CUT 100' PIPE, MU NEW MHA, RIH MEMORY GR/CCL LOG INTERVAL
15400' - 15810', FLAG PIPE AT 15675' CTM. POOH.
OOH W/M/GR/CCL TOOL. CORRECTED EOP AT FLAG = 15657.5'. RIH W/(20')
2.5" HSD 6 SPF 2506 PJ GUN. AT FLAG CORRECT TO TOP SHOT, 15664'.
SHOOT INTERVAL 15730' - 15750'. PICKUP GUN RUN #4 - SHOOT INTERVAL
15700' - 15720'. ALL SHOTS FIRED. RDMO. NOTIFY DSO THAT WELL IS
READY TO POP. <<<< JOB COMPLETED >>>>.
Page 1
P2-08
DESCRIPTION OF WORK COMPLETED
NRWO OPERATIONS
FLUIDS PUMPED
BBLS
1 DIESEL FOR PRESSURE TESTING SURFACE PRESSURE CONTI~0L EQUIP
292 60/40 METHANOL
293 TOTAL
02/23/2002
ADD PERFS
THE FOLLOWING INTERVALS WERE PERFORATED USING THE 2-1/2" POWERJET,
LOADED 6 SPF, 60 DEGREES PHASING, RANDOM ORIENTATION.
15700'-15720'
15730'-15775'
15785'-15790'
Page 2
198-123-0 POINT MCINTYRE P2-08 50- 029-22896-00 BP EXPLORATION
Roll/41: Start: Stop Roll #2: Start Stop (ALASKA) INC
MD 15971 TVD 09203 Completion Date: 12/8/98 Completed Status: 1-OIL Current:
T Name Interval Sent Received T/C/D
D 8865 3,4 SPERRY MPT/GR/EWR4/CNP/SLD OH 2/17/99 2/17/99
L DGR/CNP/SLD-MD FINAL 5481-15971 OH 2/24/99 2/24/99
L DGR/CNP/SLD-TVD FINAL 4958-9203 OH 2/24/99 2/24/99
L DGR/EWR4-MD FINAL 5481-15971 OH 2/24/99 2/24/99
L DGR/EWR4-TVD FINAL 4958-9203 OH 2/24/99 2/24/99
Thursday, January 18, 2001 Page 1 of 1
~' '-~J' STATE OF ALASKA '--=.-
ALASKA OIL AND GAS CONSERVATION COMMISSION
REPORT OF SUNDRY WELL OPERATIONS
1. Operations performed: Operation shutdown_ Stimulate _X Plugging _ Perforate _X
Pull tubing _ Alter casing _ Repair well _ Other_
2. Name of Operator 5. Type of Well: 6. Datum elevation (DF or KB feet)
ARCO Alaska, Inc. Development~X RKB 49 feet
3. Address Explorato~__ 7. Unit or Property name
P. O. Box 100360 Stratigraphic__
Anchorage, AK 99510-0360 service__ Point Mclntyre Unit
4. Location of well at surface 8. Well number
5259' FNL, 4207' FEL, Sec. 11, T12N, R14E, UM P2-08
At top of productive interval 9. Permit number / approval number
3037' FSL, 3887' FWL, Sec. 07, T12N, R15E, UM 98-123
At effective depth 10. APl number
50-029-22896
At total depth 11. Field / Pool
2188' FNL, 3858' FEL, Sec. 7, T12N, R15E, UM Point Mclntyre Oil Pool
12. Present well condition summary
Total depth: measured 15971 feet Plugs (measured) Tagged PBTD @ 15935' MD (8/25/1999)
true vertical 9203 feet
Effective depth: measured 15935 feet Junk (measured)
true vertical 9183 feet
Casing Length Size Cemented Measured Depth True vertical Depth
Conductor 110' 20" Driven 110' 110'
Surface 5485' 9-5/8" 1544 Sx Coldset III & 456 Sx G 5485' 4962'
Intermediate 14500' 7" 271 Sx C~ass G 14500' 8488'
Liner 1350' 4-1/2" 345 Sx C~ass G 15971' 9203'
Perforation depth: measured 15730" - 15775'; 15785' - 15790'. .-; !!~ ~'~' -~ ii ','. ': i~ -i' >:
·
true vertical 9065' -9090'; 9096'-9090'. ;:, ;'~- _;!~i!¢;;
Tubing (size, grade, and measured depth) 3-1/2"9.2#, 13CR Tbg @ 14594' MD.~.~.~¢~¥¢~ ~ ~;~ ~ ,~ ~_;~~u~ ~¢=' - ...... ; ' ~, ~:, .: ~ ~ ~ .~-~'~"~: :-: . , ~ ~ : . . ....
Packers & SSSV (type & measured depth) 7" x 4-1/2" Backer S-3 Packer @ 14546' MD.
HES, 3-1/2", SERIES 10, TRSSSV @ 1990' MD.
13. Stimulation or cement squeeze summary
Intervals treated (measured) (see attached)
Treatment description including volumes used and final pressure
14. Representative Daily Avera,qe Production or Injection Data
OiI-Bbl Gas-Md Water-Bbl Casing Pressure Tubing Pressure
Prior to well operation 619 436 0 - 777
Subsequent to operation 995 652 9 - 777
15. Attachments 16. Status of well classification as:
Copies of Logs and Surveys run __
Daily Report of Well Operations ._X Oil __X Gas __ Suspended __ Service
17. I hereby certify that the foregoing is true and correct to the best of my knowledge.
Signed ~1¢~. ~~~_,,_. ~ ~ O 4¢~-2- Title ARCO Engineering Supervisor Date ~//~<~..~,/~
Erin Oba ~ Pre'pared by Paul Rauf 263-4990
Form 10-404 Rev 06/15/88 ·
SUBMIT IN DUPLICATE
P2-08
DESCRIPTION OF WORK COMPLETED
STIM-STICK HIGH PRESSUE BREAKDOWN STIMULATION / PERFORATING OPERATIONS
Date Event Summary
7/16/1999:
7/23/1999:
8/25/1999:
8/30/1999:
RIH &tagged PBTD @ 15925' SLM.
Performed a Stim-Stick* Stimulation as follows: MIRU ELU. PT'd equip to 3000 psi. RIH w/
CCL-GR Jewelry Logging tools & logged f/PBTD to 14450' MD. POOH w/logging tools.
RIH w/Stim-Stick tool & shot a 12' Stim-Stick interval f/15762' - 15744' MD. POOH.
Achieved a 13500 psi max press indication f/Kipster Gauge. RD.
RIH &tagged PBTD @ 15935' MD.
RIH w/perforating guns & added 20' of perforations @:
15730' - 15750' MD
Used 2-1/2" carriers & all shots @ 6 SPF. POOH w/guns. ASF. RD.
Returned well to production & obtained a valid welltest.
* Stim-Stick is a perforation breakdown tool that consists of a propellant molded over a 1/2"
tube which is ignited producing an instantaneous burst of high pressure gas that dissipates
quickly around the Stim-Stick. The high pressure gas enters the perforation and breaks
through any damage around the tunnel, creating fractures. This high pressure gas creates
enough short-term pressure to provide dynamic fracturing without creating enough pressure
to damage or rubblize the rock as with the use of explosives.
STATE OF ALASKA
ALASK/~ ". AND GAS CONSERVATION COMMIS N
REPOR'i'-~F SUNDRY WELL OPERATIONS
1. Operations performed: Operation shutdown __ Stimulate __ Plugging
Pull tubing __ Alter casing __ Repair well __
Perforate __~
Other __
2. Name of Operator
ARCO Alaska, Inc.
3. Address
P.O. Box 100360, Anchorage~ AK 99510
4. Location of well at surface
5258' FNL, 4206' FEL, Sec. 11, T12N, R14E
At top of production interval
3037' FSL, 3887' FWL, Sec. 7, T12N, R15E
At effective depth
At total depth
2188' FNL, 3858' FEL, Sec. 7, T12N, R15E
5. Type of Well:
Development ._~
Exploratory __
Stratigraphic __
Service
Datum elevation (DF or KB)
KB 49.02 feet
7. Unit or Properly name
POINT MCINTYRE UNIT
8. Well number
P2-08
9. Permit number/approval number
98-123 /
10. APl number
500292289600
11. Field/Pool
Point Mclntyre
12. Present well condition summary
Total Depth: measured:
true vertical:
Effective Depth: measured:
true vertical:
Casing Length Size
Conductor 69' 20"
Surface 5485' 9 5/8"
Intermediate
14500' 7"
Liner
Perforation depth:
15971 feet Plugs (measured)
9203 feet
15932 feet Junk (measured)
9181 feet
Cemented
Driven
1544 sx Coldset III &
456 Class 'G'
271 sx Class 'G'
1350' 4 1/2" 345 sx Class 'G'
measured
15750-15755', 15755-15775', 15785-15790'
true vertical
9026-9029', 9029-9041', 9047-9050'
Tubing (size, grade, and measured depth)
3 1/2 in. 9.2# 13CR @ 0-14594' MD,
Packers and SSSV (type and measured depth)
2 8/9 x 6 1/6 PKR @ 14546' MD, 2 4/5 x 3 1/2 SSSV @ 1990' MD
None.
None.
True vertical depth
110'
4962'
Measured depth
110'
5485'
14500' 8488'
15971' 9203'
RECEIVED
JUL 22 1999
Alaska 0it & Gas Cons. Commissie~
Anc,~r~e
3. Stimulation or cement squeeze summary
Intervals treated (measured)
Treatment description including volumes used and final pressure
ORI6II AL
14.
Oil-Bbl Gas-Mcf
Prior to well operation 442 2589
Subsequent to operation 640 3201
15. Attachments
Copies of Logs and Surveys run
Daily Report of Well Operations
Representative Daily Average Production or Iniection Data
Water-Bbl
16.
Casing Pressure Tubing Pressure
14 2150 80
10 2450 1820
Status of well classification as:
Oil ~ Gas __ Suspended Service
Signed ~ ~ Title
Date
Form 10-404 Rev 06/15/88
SUBMIT IN DUPLICATE
P2-08
DESCRIPTION OF WORK COMPLETED
ADDED PERFORATIONS
Date
Event Summary
01-11-1999
RIHw/2 1/2"guns and added pedorations at:
15750'-15755' MD
15785'-15790' MD
Altshots at6 SPF and 60 deg phasing.
Well: P2.-08
5490-
--
8450-
8455-
--
SSSV -- -
10530
14546
PACKER
X NIPPLE --- --- -------
XN--
NIPPLE
WLEG --
Perf
Perf
Perf
GPMA
WEB Date' 6/16/99
APh 500292289600
SSSV Type: HES 3-1/2"
SERIES 10
Annular Fluid:
Reference GR-RES
Log:
Last Tag: 15899' SLM
Last Tag Date: 1/7/99
Well Type: PROD
Odg Compltn: 12/8/98
Last W/O:
Ref Log Date: 11/12/98
TD: 15975 ftKB
Max Hole 75 deg @ 8469
Anqle:
Angle @ TS: deg @
Angle @ TD: 55 deg @ 15971
Rev Reason: Pulled DHSIT
Last Update: 6/8/99
Depth TVD Type Description iD
1990 1983 SSSV HES, 3-1/2", SERIES 10, TRSSSV 2.810
14546 8505 PACKER Baker 7" x 4-1,/2", S-3 2.900
14571 8515 X NIPPLE HES 3-1/2" X nipple 2.810
14582 8519 XN HES 3-1/2" XN nipple 2.750
NIPPLE
14593 8523 WLEG 3-1/2" Wireline Entry Guide 3.000
Size Weight Grade Top Btm Feet Description
9.625 40.00 0 5485 5485 SURFACE
7.000 2600 0 14500 14500 PRODUCTION
7.000 29.00 14500 14874 374 PRODUCTION
6.172 0.00 14591 14621 30 LINER HGR ASSBLY
4.500 12~60 14621 15971 1350 LINER
Size Weight Grade Top Btm Feet Description
3.500 9.20 13CR 0 14594 14594 TUBING
Stn MD TVD Man Man VMfr VType VOD Latch Port TRO Date Vitv
Mfr Type Run Comment
I 4198 4049 CAMCO FMHO GLV 1.5 RK 0.250 2512 11/27/98
2 5464 4946 CAMCO FMHO DV 1.5 RK 0.000 0 11/21/98
3 8447 6096 CAMCO FMHO GLV 1.5 RK 0.250 2450 11/28/98
4 10525 8891 CAMCO FMHO DV 1.5 RK 0.000 0 2/23/99
5 12470 7696CAMCO FMHO DV 1.5 RK 0.000 0 11/21/98
6 14207 8374CAMCO FMHO DV 1.5 RK 0.000 0 11/21/98
7 14482 8482 CAMCO FMHO OV 1.5 TG 0.310 0 2/24/99
CAMCO
CAMCO
CAMCO
CAMCO
CAMCO
CAMCO
CAMCO
Interval TVD Zone Statue Feet SPF Date Type Comment
15750 - 9076 - 9079 5 6 1/11/99 APERF 2-1/2" guns, 60 deg phasing
15755
15755 - 9079 - 9090 20 6 12/8/98 IPERF 2-1/2" guns, 60 deg phasing
15775
15785 - 9096 - 9099 5 6 1/11/9c~ APERF 2-1/2" guns, 60 deg phasing
15790
r'l F:! I I_1_ I IM G S I::: i::! ~j i i-- i:::S
WELL LOG TRANSMITTAL
To: State of Alaska February 24, 1999
Alaska Oil and Gas Conservation Comm.
Attn.: Lori Taylor
3001 Porcupine Dr.
Anchorage, Alaska 99501 ~ ~' / ~
MWD Formation Evaluation Logs P2-08, AK-MM-90004
The technical data listed below is being submitted herewith. Please address any problems or concerns
to the attention
Ali Turker, Sperry-Sun Drilling Services, 5631 Silverado Way, ~G, Anchorage, AK 99518
P2-08:
2"x 5" MD Resistivity & Gamma Ray Logs:
50-029-22896-00
2" x 5" TVD Resistivity & Gamma Ray Logs:
50-029-22896-00
2"x 5" MD Neutron & Density Logs:
50-029-22896-00
2"x 5"MD Neutron & Density Logs:
50-029-22896-00
1 Blueline
1 Folded Sepia
1 Blueline
1 Folded Sepia
1 Blueline
1 Folded Sepia
~.4-glueline
·
epla
5631 Silverado Way, Suite G · Anchorage, Alaska 99518 · (907) 273-3500 · Fax (907) 273-3535
A Halliburton Company
WELL LOG TRANSMITTAL
To: State of Alaska February 17, 1999
Alaska Oil and Gas Conservation Comm.
Attn.: Loft Taylor
3001 Porcupine Drive.
Anchorage, Alaska 99501
MWD Formation Evaluation Logs - P2-08,
AK-MM-90004
The technical data listed below is being submitted herewith. Please acknowledge receipt by retuming a
signed copy of this transmittal letter to the attention of.'
Ali Turker, Sperry-Sun Drilling Services, 5631 Silverado Way, #G, Anchorage, AK 99518
1 LDWG formatted Disc with verification listing.
API#: 50-029-22896-00
5631 Silverado Way, Suite G · Anchorage, Alaska 99518 · (907) 273-3500 · Fax (907) 273-3535
A Halliburton Company
.... STATE OF ALASKA .~
ALASKA OIL AND GAS CONSERVATION COMMISSION
WELL COMPLETION OR REOOMPLETION REPORT AND LOG
1. Status of Well Classification of Service Well
[] Oil [] Gas [] Suspended [] Abandoned [] Service
2. Name of Operator 7. Permit Number
ARCO Alaska Inc. 98-123
3. Address 8. APl Number
P.O. Box 196612, Anchorage, Alaska 99519-661.2 ............ ~-, 50-029-22896
~ ............ ' ~ ?~"~;' ' ' -~' 9. Unit or Lease Name
4. Location of well at surface ! ~.. ~ . ~~ ~
18' NSL, 1073' WEE, SEC. 11, T12N, R14E, UM ~ ._/,2.,,~/~,,~ i! ~ ~ Point Mclntyre
At top of productive interval ~,~._..~~. 10. Well Number
3037' NSL, 3887' EWL, SEC. 7, T12N, R15E, UM; ~-.~-,--~ ~ P2-08
At total depth ;: .... ~_ ~~~~_:~ 11. Field and Pool
3098' NSL, 4052' EWL, SEC. 7, T12N, R15E, UM Point Mclntyre
5. Elevation in feet (indicate KB, DF, etc.) 16. Lease Designation and Serial No.
KBE = 49.02'I ADL365548
12. Date Spudded10/31/98 I 13' Date T'D' Reached I 14' Date C°mp" Susp" °r Aband'l15' Water depth' if °ffsh°re 16' N°' °f C°mpleti°nsl 1/12/98 12/8/98 N/A Mac One
17. Total De ,pth (MD+TVD)I18. Plug Back Depth (MD+TVD) 19. Directional Survey 120. Depth where SSSV set 121 . Thickness of Permafrost
15971 9203 FTI 15932' 9181 FT [~Yes I~No 1990' MD 1800' (Approx.)
22. Type Electric or Other Logs Run
MWD, LWD, Gyro, GR/RES/DENS
23. CASlNG~ LINER AND CEMENTING RECORD
CASING SETTING DEPTH HOLE
SIZE WT. PER FT. GRADE TOP BO-FrOM SIZE CEMENTING RECORD AMOUNT PULLED
20" 133# H-40 41' 110' 30" Driven
5469' 12-1/4" 1544 sx Coldset III, 456 Class "G' ~-~ ~-, ~
9-5/8"
4O#
L-80
38'
7" 26#/29# L-80/13CR 35' 14874' 8-3/4" 271 sx Class 'G'~'~ ~ ~
4-1/2" 12.6# 13CR 14591' 15971' 6" 345 sx Class 'G'
dAN ¢,R
24. Perforations open to Production (MD+TVD of Top and 25. TUBING RECORD /~IBS~(a Oil& GaS O~r~.~
Bottom and interval, size and number) SIZE DEPTH SET (MD) PACKER
2-1/2" Gun Diameter, 6 spf 3-1/2", 9.2#, 13CR 14593' 14546'
MD TVD MD TVD
......
15755' - 15775' 9079' - 9090' 26. AC~D, FRACTURE, CEMENT SQUEEZE, ETC.
DEPTH INTERVAL (MD) AMOUNT & KIND OF MATERIAL USED
Freeze protect with 65 bbls Diesel
27. PRODUCTION TEST
Date First Production Method of Operation (Flowing, gas lift, etc.) /~ k
December 13, 1998 Gas Lift
Date of Test Hours Tested PRODUCTION FOR OIL-DEL GAS-MCF WATER-DEL CHOKE SIZE IGAS-OIL RATIO
TEST PERIOD
I
Flow Tubing Casing Pressure CALCULATED iOIL-BBL GAS-MCF WATER-DEL OIL GRAVITY-APl (CORR)
Press. 24-HOUR RATE
28. CORE DATA ...........
Brief description of lithology, porosity, fractures, apparent dips and presence of oil, gas or water. Submit core chips.
ED
Form 10-407 Rev. 07-01-80 Submit In Duplicate
29. Geologic Markers 30. Formation Tests
Measured True Vertical Include interval tested, pressure data, all fluids
Marker Name Depth Depth recovered and gravity, GOR, and time of each phase.
Kuparuk Zone UC1 15694' 9044'
Kuparuk Zone UB1 15755' 9079'
Kuparuk Zone UA3 15789' 9098'
31. List of Attachments
Summary of Daily Drilling Reports, Surveys
,
32. I hereby certify th.aJz.~he fore,~oing is true a~nd correct to the best of my knowledge
Signed --P~ ~.¢ .... / /
· ~ /~,e Drilling Engineering Supervisor Date
,,, Lowellp2Crane08 ~'" 98-123 ' Prepared By Name/Number: Carol Withey, 564-4i 14
Well Number Permit No. / Approval No.
INSTRUCTIONS
GENERA': This form is designed for submitting a complete and correct well completion report and log on all types of lands and
leases in Alaska.
ITEM 1: Classification of Service Wells: Gas injection, water injection, steam injection, air injection, salt water disposal, water
supply for injection, observation, injection for in-situ combustion.
ITEM 5: Indicate which elevation is used as reference (where not otherwise shown) for depth measurements given in other spaces
on this form and in any attachments.
ITEM 16 .AND 24: If this well is completed for separate production from more than one interval (multiple completion), so state in item
16, and in item 24 show the producing intervals for only the interval reported in item 27. Submit a separate form for each additional
interval to be separately produced, showing the data pertinent to such interval.
ITEM 21: Indicate whether from ground level (GL) or other elevation (DF, KB, etc.).
ITEM 23: Attached supplemental records for this well should show the details of any multiple stage cementing and the location of
the cementing tool.
ITEM 27: Method of Operation: Flowing, Gas Lift, Rod Pump, Hydraulic Pump, Submersible, Water Injection, Gas Injection, Shut-In,
Other-explain.
ITEM 28: If no cores taken, indicate 'none'.
Form 10-407 Rev. 07~01-80
Performance Enquiry Report
Operator ARCO Date 02:47, 08 Dec 98
Page 1
The analysis is from - 05:00, 05 Nov 98 - to - 05:00, 05 Nov 98
Programs in Result Table: P2-08
Well Type Time From Time To Duration Description E.M.W.(equivalent mud weight) Hole Size MDR
P2-08 Event 05:00, 05 Nov 98 05:00, 05 Nov 98 0 hr 0 min Obtained required level of integrity 14.0 8-3/4
Facility
Date/Time
28 Oct 98
29 Oct 98
30 Oct 98
31 Oct 98
01 Nov 98
02 Nov 98
03 Nov 98
04 Nov 98
Pt Mac 2
'_ L,
Progress Report
Well P2-08
Rig Nabors 33E
Page
Date
Duration
Activity
16:30-06:00
06:00-06:00
06:00-10:30
10:30-11:30
11:30-13:30
13:30-20:30
20:30-21:00
21:00-01:00
01:00-01:30
01:30-02:00
02:00-02:30
02:30-05:30
05:30-06:00
06:00-06:00
06:00-06:00
06:00-09:30
09:30-09:45
09:45-12:00
12:00-13:30
13:30-14:00
14:00-17:00
17:00-21:30
21:30-22:30
22:30-23:00
23:00-23:30
23:30-00:30
00:30-03:00
03:00-04:30
04:30-06:00
06:00-07:00
07:00-07:30
07:30-08:30
08:30-10:00
10:00-16:00
16:00-16:30
16:30-18:00
18:00-18:30
18:30-19:00
19:00-19:30
19:30-20:00
20:00-21:30
21:30-22:15
22:15-23:00
23:00-01:00
01:00-03:30
03:30-06:00
06:00-10:30
10:30-11:30
11:30-12:00
12:00-14:30
14:30-15:30
15:30-16:00
16:00-19:00
19:00-20:30
13-1/2 hr
24 hr
4-1/2 hr
1 hr
2 hr
7 hr
1/2 hr
4 hr
1/2 hr
1/2 hr
1/2 hr
3hr
1/2 hr
24 hr
24 hr
3-1/2 hr
1/4 hr
2-1/4 hr
1-1/2 hr
1/2 hr
3 hr
4-1/2 hr
1 hr
1/2 hr
1/2 hr
1 hr
2-1/2 hr
1-1/2 hr
1-1/2 hr
1 hr
1/2 hr
lhr
1-1/2 hr
6 hr
1/2 hr
1-1/2 hr
1/2 hr
1/2 hr
1/2 hr
1/2 hr
1-1/2 hr
3/4 hr
3/4 hr
2 hr
2-1/2 hr
2-1/2 hr
4-1/2 hr
1 hr
1/2 hr
2-1/2 hr
1 hr
1/2 hr
3 hr
1-1/2 hr
Rig waited · Production facilities
Rig waited' Production facilities (cont...)
Rig moved 25.00 %
Skid rig
Rig moved 100.00 %
Rigged up Bell nipple
Held safety meeting
Made up BHA no. 1
Tested Fluid system
Drilled to 256.1 ft
Pulled out of hole to 38.1 ft
Made up BHA no. 1
Rigged up Survey wireline unit
Drilled to 3043.1 ft
Drilled to 5025.0 ft (cont...)
Drilled to 5066.0 ft (cont...)
Flow check
Pulled out of hole to 0.0 ft
Made up BHA no. 2
Serviced Top drive
R.I.H. to 5066.0 ft
Drilled to 5480.0 ft
Circulated at 5480.0 ft
Pulled out of hole to 4540.0 ft
R.I.H. to 5480.0 ft
Circulated at 5480.0 ft
Pulled out of hole to 820.0 ft
Laid down 372.0 ft of 5in OD drill pipe
Rigged up Casing handling equipment
Rigged up Casing handling equipment (cont...)
Held safety meeting
Ran Casing to 120.0 ft (9-5/8in OD)
Repaired Circulating head
Ran Casing to 5468.0 ft (9-5/8in OD)
Rigged up Cement head
Circulated at 5468.0 ft
Held safety meeting
Tested High pressure lines
Mixed and pumped slurry - 296.000 bbl
Displaced slurry - 400.000 bbl
Circulated at 2000.0 ft
Mixed and pumped slurry - 300.000 bbl
Displaced slurry - 145.000 bbl
Rigged down Casing handling equipment
Removed Bell nipple
Rigged up BOP stack
Rigged up BOP stack (cont...)
Installed BOP test plug assembly
Held safety meeting
Tested All functions
Removed BOP test plug assembly
Rigged up Drillstring handling equipment
Made up BHA no. 3
Singled in drill pipe to 2010.0 ft
1
07 December 98
Facility
Date/Time
05 Nov 98
06 Nov 98
07 Nov 98
08 Nov 98
09 Nov 98
10 Nov 98
11 Nov 98
12 Nov 98
13 Nov 98
Pt Mac 2
Progress Report
Well P2-08
Rig Nabors 33E
Duration
Activity
20:30-21:00
21:00-21:30
21:30-01:00
01:00-01:30
01:30-02:30
02:30-03:00
03:00-03:45
03:45-04:00
04:00-04:30
04:30-05:00
05:00-06:00
06:00-06:00
06:00-06:00
06:00-07:00
07:00-07:15
07:15-11:00
11:00-11:30
11:30-14:30
14:30-15:00
15:00-19:30
19:30-20:30
20:30-21:00
21:00-06:00
06:00-06:00
06:00-12:00
12:00-13:00
13:00-22:00
22:00-00:00
00:00-01:00
01:00-03:30
03:30-05:00
05:00-06:00
06:00-09:30
09:30-12:00
12:00-13:00
13:00-14:00
14:00-20:00
20:00-21:30
21:30-23:30
23:30-06:00
06:00-06:00
06:00-06:30
06:30-08:00
08:00-10:00
10:00-10:30
10:30-18:00
18:00-20:30
20:30-22:00
22:00-00:00
00:00-03:30
03:30-06:00
06:00-14:30
14:30-17:00
17:00-17:30
1/2 hr
1/2 hr
3-1/2 hr
1/2 hr
lhr
1/2 hr
3/4 hr
1/4 hr
1/2 hr
1/2 hr
1 hr
24 hr
24 hr
1 hr
1/4 hr
3-3/4 hr
1/2 hr
3 hr
1/2 hr
4-1/2 hr
1 hr
1/2 hr
9 hr
24 hr
6 hr
1 hr
9 hr
2 hr
1 hr
2-1/2 hr
1-1/2 hr
lhr
3-1/2 hr
2-1/2 hr
1 hr
1 hr
6 hr
1-1/2 hr
2 hr
6-1/2 hr
24 hr
1/2 hr
1-1/2 hr
2 hr
1/2 hr
7-1/2 hr
2-1/2 hr
1-1/2 hr
2 hr
3-1/2 hr
2-1/2 hr
8-1/2 hr
2-1/2 hr
1/2 hr
Circulated at 2010.0 ft
Drilled installed equipment - DV collar
Singled in drill pipe to 5380.0 ft
Circulated at 5380.0 ft
Tested Casing
Held drill (Kick (well kill))
Drilled installed equipment - Float collar
Drilled to 5512.0 ft
Circulated at 5500.0 ft
Performed formation integrity test
Drilled to 5608.0 ft
Drilled to 8681.0 ft (cont...)
Drilled to 10905.0 ft (cont...)
Circulated at 10905.0 ft
Flow check
Pulled out of hole to 5468.0 ft
Held safety meeting
Serviced Draw works
Serviced Top drive
Singled in drill pipe to 9788.0 ft
R.I.H. to 10793.0 ft
Washed to 10905.0 ft
Drilled to 11831.0 ft
Drilled to 14037.0 ft (cont...)
Drilled to 14575.0 ft (cont...)
Circulated at 14575.0 ft
Pulled out of hole to 507.0 ft
Pulled BHA
Retrieved Wear bushing
Tested BOP stack
Installed Wear bushing
Made up BHA no. 4
Made up BHA no. 4 (cont...)
R.I.H. to 5468.0 ft
Repaired SCR
Circulated at 5468.0 ft
R.I.H. to 14575.0 ft
Circulated at 14575.0 ft
Circulated at 14575.0 ft
Drilled to 14735.0 ft
Drilled to 15500.0 ft (cont...)
Drilled to 15542.0 ft (cont...)
Circulated at 15542.0 ft
Pulled out of hole to 13911.0 ft
R.I.H. to 15542.0 ft
Drilled to 15971.0 ft
Circulated at 15971.0 ft
Pulled out of hole to 13646.0 ft
R.I.H. to 15971.0 ft
Circulated at 15971.0 ft
Pulled out of hole to 14000.0 ft
Pulled out of hole to 528.0 fl (cont...)
Pulled BHA
Retrieved Wear bushing
Page
Date
2
07 December 98
Facility
Date/Time
14 Nov 98
15 Nov 98
16 Nov 98
17 Nov 98
18 Nov 98
19 Nov 98
Progress Report
Pt Mac 2
Well P2-08
Rig Nabors 33E
Page 3
Date 07 December 98
17:30-19:00
19:00-20:30
20:30-21:00
21:00-03:00
03:00-04:00
04:00-06:00
06:00-08:00
08:00-11:00
11:00-13:00
13:00-16:00
16:00-17:30
17:30-18:00
18:00-01:30
01:30-03:00
03:00-04:30
04:30-06:00
06:00-08:00
08:00-08:30
08:30-09:00
09:00-09:15
09:15-11:00
11:00-15:00
15:00-16:00
16:00-02:30
02:30-06:00
06:00-10:00
10:00-10:30
10:30-12:30
12:30-02:30
02:30-04:00
04:00-05:30
05:30-06:00
06:00-09:30
09:30-10:30
10:30-12:30
12:30-15:00
15:00-15:30
15:30-16:00
16:00-19:00
19:00-00:30
00:30-02:00
02:00-04:00
04:00-06:00
06:00-15:30
15:30-18:00
18:00-19:00
19:00-21:30
21:30-21:45
21:45-22:15
22:15-23:00
23:00-01:00
01:00-06:00
06:00-08:00
08:00-11:00
Duration
1-1/2 hr
1-1/2 hr
1/2 hr
6 hr
1 hr
2 hr
2 hr
3 hr
2 hr
3 hr
1-1/2 hr
1/2 hr
7-1/2 hr
1-1/2 hr
1-1/2 hr
1-1/2 hr
2 hr
1/2 hr
1/2 hr
1/4 hr
1-3/4 hr
4 hr
1 hr
10-1/2 hr
3-1/2 hr
4 hr
1/2 hr
2 hr
14hr
1-1/2 hr
1-1/2 hr
1/2 hr
3-1/2 hr
1 hr
2 hr
2-1/2 hr
1/2 hr
1/2 hr
3 hr
5-1/2 hr
1-1/2 hr
2 hr
2 hr
9-1/2 hr
2-1/2 hr
1 hr
2-1/2 hr
1/4 hr
1/2 hr
3/4 hr
2 hr
5 hr
2 hr
3 hr
Activity
Tested Top ram
Rigged up Casing handling equipment
Held safety meeting
Ran Casing to 5378.0 ft (7in OD)
Circulated at 5378.0 ft
Ran Casing to 7in (7400.0 ft OD)
Ran Casing to 9982.0 ft (7in OD) (cont...)
Circulated at 9982.0 ft
Ran Casing to 12500.0 ft (7in OD)
Circulated at 12500.0 ft
Ran Casing to 13500.0 ft (7in OD)
Circulated at 13500.0 ft
Ran Casing to 14870.0 ft (7in OD)
Circulated at 14870.0 ft
Rigged up Cement head
Circulated at 14870.0 ft
Circulated at 14874.0 ft (cont...)
Tested High pressure lines
Pumped Water based mud spacers - volume 90.000 bbl
Mixed and pumped slurry - 53.000 bbl
Displaced slurry - 567.000 bbl
Installed Slip & seal assembly
Worked on BOP - Top ram
Laid out 5in drill pipe from derrick
Installed BOP stack
Tested BOP stack
Installed Wear bushing
Made up BHA no. 5
Singled in drill pipe to 14834.0 ft
Tested Casing
Serviced Block line
Drilled installed equipment - Float collar
Drilled installed equipment - Float collar (cont...)
Pulled out of hole to 15425.0 ft
R.I.H. to 15971.0 ft
Circulated at 15971.0 ft
Pulled out of hole to 14971.0 ft
R.I.H. to 15971.0 ft
Circulated at 14971.0 ft
Pulled out of hole to 14971.0 ft
Pulled BHA
Rigged up Casing handling equipment
Ran Liner to 4-1/2in (800.0 ft OD)
Ran Liner to 14874.0 ft (4-1/2in OD) (cont...)
Circulated at 14874.0 ft
Ran Liner on landing string to 15971.0 ft
Circulated at 15971.0 ft
Pumped Water based mud spacers - volume 60.000 bbl
Mixed and pumped slurry - 92.000 bbl
Displaced slurry - 174.000 bbl
Circulated at 14607.0 ft
Pulled Drillpipe in stands to 4000.0 ft
Pulled Drillpipe in stands to 0.0 ft (cont...)
Made up BHA no. 6
Facility
Date/Time
20 Nov 98
21 Nov 98
22 Nov 98
23 Nov 98
24 Nov 98
Progress Report
Pt Mac 2
Well P2-08 Page 4
Rig Nabors 33E Date 07 December 98
11:00-15:00
15:00-16:30
16:30-18:00
18:00-19:00
19:00-01:00
01:00-02:00
02:00-04:00
04:00-06:00
06:00-06:30
06:30-11:30
11:30-12:00
12:00-13:00
13:00-14:00
14:00-14:30
14:30-21:30
21:30-23:30
23:30-04:00
04:00-06:00
06:00-09:00
09:00-09:30
09:30-19:00
19:00-22:00
22:00-00:00
00:00-00:30
00:30-06:00
06:00-04:00
04:00-04:30
04:30-06:00
06:00-10:30
10:30-13:00
13:00-20:00
20:00-23:00
23:00-00:00
00:00-01:30
01:30-03:00
03:00-06:00
06:00-08:00
08:00-09:30
09:30-12:00
12:00-13:00
13:00-15:00
15:00-16:00
16:00-17:00
17:00-18:00
18:00-19:00
19:00-21:00
Duration
4 hr
1-1/2 hr
1-1/2 hr
1 hr
6hr
1 hr
2 hr
2 hr
1/2 hr
5 hr
1/2 hr
lhr
1 hr
1/2 hr
7 hr
2 hr
4-1/2 hr
2 hr
3 hr
1/2 hr
9-1/2 hr
3 hr
2 hr
1/2 hr
5-1/2 hr
22 hr
1/2 hr
1-1/2 hr
4-1/2 hr
2-1/2 hr
7 hr
3 hr
1 hr
1-1/2 hr
1-1/2 hr
3 hr
2 hr
1-1/2 hr
2-1/2 hr
1 hr
2 hr
1 hr
1 hr
1 hr
1 hr
2 hr
Activity
R.I.H. to 15932.0 ft
Circulated at 15932.0 ft
Tested Liner
Circulated at 15932.0 ft
Pulled out of hole to 1359.0 ft
Pulled BHA
Ran Drillpipe in stands to 2000.0 ft
Repaired Draw works
Repaired Draw works (cont...)
Ran Drillpipe in stands to 14607.0 ft
Space out tubulars
Circulated at 14607.0 ft
Set packer at 14599.0 ft with 2700.0 psi
Tested Liner
Pulled out of hole to 0.0 ft
Made up BHA no. 7
R.I.H. to 15971.0 ft
Circulated at 15971.0 ft
Circulated at 15971.0 ft (cont...)
Held safety meeting
Laid down 133602.0 ft of 4in OD drill pipe
Pulled BHA
Retrieved Wear bushing
Held safety meeting
Ran Tubing to 3-1/2in (1200.0 ft OD)
Ran Tubing to 12500.0 ft (3-1/2in OD) (cont...)
Installed SCSSSV nipple assembly
Ran Tubing to 3-1/2in (13500.0 ft OD)
Ran Tubing to 14594.0 ft (3-1/2in OD) (cont...)
Installed Tubing hanger
Rigged down BOP stack
Installed Xmas tree
Tested Xmas tree
Circulated at 14594.0 ft
Freeze protect well - 232.000 bbl of Diesel
Circulated at 14594.0 ft
Freeze protect well - 65.000 bbl of Diesel
Rigged up Slickline unit
Conducted slickline operations on Slickline equipment - Tool run
Tested Tubing
Tested Permanent packer
Rigged down Slickline unit
Installed BOP test plug assembly
Held safety meeting
Held safety meeting
Rig waited · Orders
Shared Services Drilling Alaska
Prudhoe Bay Unit
Alaska State Plane Zone 4
Point Mclntyre Pad 2, Slot P2-08
P2-08
Job No. AKMMgO004, Surveyed: 12 November, 1998
SURVEY REPORT
ORIGINAL
RECEIVED
DEC O8 1998
Oil & Gas" ....
Anchorage
8 December, 1998
Your Ref: API-500292289600
KBE - 49.02'
MWD Survey Instrument
Surface Coordinates: 5998595.59 N, 681308.46 E (70° 24' 04.9919" N, 148° 31' 27.0902" W)
DRILLING SERVICES
Survey Ref: svy4261
Sperry-Sun Drilling Services
Survey Report for P2-08
Your Ref: AP1-500292289600
Job No. AKMM90004, Surveyed: 12 November, 1998
Shared Services Drilling Alaska
Prudhoe Bay Unit
Measured Sub-Sea
Depth Incl. Azim. Depth
(ft) (ft)
960.00 5.800 211.000 909.66
1042.72 6.190 207.950 991.93
1138.83 8,040 215.120 1087.30
1230.38 8.570 219.810 1177.89
1325.59 8.460 218.250 1272.05
1422.95 7.510 221.370 1368.47
1516.83 5.760 217.530 1461.71
1609.87 4.800 215,380 1554.36
1706.16 4.140 216.370 1650.36
1800.28 3.810 221.550 1744.25
1894.14 2.490 231.850 1837.97
1988.92 0.880 232.110 1932.70
2083.65 0,670 6.450 2027.43
2178.51 2.170 29.390 2122.26
2271.52 2.450 76.000 2215.20
2365.77 3.230 81.550 2309.33
2460.12 3.980 86.460 2403.50
2554.81 5,280 93.850 2497.87
2648.07 6.840 97.550 2590.61
2744.11 7.800 105.010 2685.87
2837.37 9,820 111.940 2778.03
2933.25 10.880 108,880 2872.35
3029.10 12,820 114.760 2966.15
3123.29 14.910 114,150 3057.59
3217.16 17,510 114.670 3147.72
Vertical Local Coordinates Global Coordinates
Depth Northings Eastings Northings Eastings
(ft) (ft) (ft) (ft) (ft)
958.68 30.32 S 16.59W 5998564.88 N 681292.61 E
1040.95 37.84 S 20.83W 5998557.25 N 681288.55 E
1136.32 47.92 S 27.13W 5998547.03 N 681282.50 E
1226.91 58.39 S 35.18W 5998536.36 N 681274.71 E
,1321.07 69.34 S 44.06W 5998525.20 N 681266.10 E
1417.49 79.74 S 52.70W 5998514.59 N 681257.71 E
1510.73 88.08 S 59.62W 5998506.09 N 681250.99 E
1603.38 94.96 S 64.72W 5998499.09 N 681246.06 E
1699.38 101.04 S 69.11W 5998492.90 N 681241.82 E
1793.27 106.12 S 73.20W 5998487.73 N 681237.85 E
1886.99 109.71S 76.88W 5998484.04 N 681234.27 E
1981.72 111.43 S 79.07W 5998482.27 N 681232.12 E
2076.45 111.33 S 79.58W 5998482.36 N 681231.60 E
2171.28 109.21S 78.64W 5998484.50 N 681232.50 E
2264.22 107.20 S 75.84W 5998486.58 N 681235.24 E
2358.35 106.32 S 71.26W 5998487.57 N 681239.80 E
2452.52 105.73 S 65.37W 5998488.31 N 681245.68 E
2546.89 105.82 S 57.74W 5998488.40 N 681253.31E
2639t63 106.83 S 47.95W 5998487.62 N 681263.12 E
2734.89 109.27 S 35.99W 5998485.48 N 681275.14 E
2827.05 113.88 S 22.49W 5998481.19 N 681288.74 E
2921.37 119.87 S 6.35W 5998475.60 N 681305.02 E
3015.17 127.25 S 11.87 E 5998468.67 N 681323.41E
3106.61 136.59 S 32.42 E 5998459.83 N 681344.18 E
3196.74 147.42 S 56.27 E 5998449.58 N 681368.30 E
Alaska State Plane Zone 4
Point Mclntyre Pad 2
Dogleg
Rate
(°/'~OOft)
Vertical
Section
(ft)
Comment
0.609
2.132
0.939
0.269
1.072
1.922
1.053
0.690
0.518
1.525
1.699
1.510
1.660
1.984
0.877
0.859
1.508
1.724
1.405
2.443
1.245
2.382
2.224
2.774
-24.18
-30.30
-39.09
-49.67
-61.18
-72.31
-81.24
-88.01
-93.88
-99.19
-103.70
-106.28
-106.74
-105.26
-102.03
-97.38
-91.54
-84.22
-75,08
-64.22
-52.48
-38.56
-23.02
-5.76
14.27
Tie-on Survey
Continued...
8 December, 1998 - 13:56 - 2 - DrillQuest
Sperry-Sun Drilling Services
Survey Report for P2-08
Your Ref: API-500292289600
Job No. AKMMgO004, Surveyed: 12 November, 1998
Shared Services Drilling Alaska
Prudhoe Bay Unit
Measured Sub-Sea
Depth Incl. Azim. Depth
(ft) (ft)
3312.05 19.830 111.650 3237.62
3406.70 22.150 106.540 3325.99
3501.07 23.690 107.270 3412.90
3594.58 26.880 104.760 3497.45
3688.91 31.260 100.750 3579.88
3782.97 32.860 97.830 3659.60
3876.41 33.110 95.140 3737.98
3971.08 33.860 91.530 3816.95
4065.17 35.500 88.910 3894.32
4159.19 37.730 85.970 3969.79
4253.85 38.830 84.990 4044.10
4348.90 45.230 82.330 4114.67
4444.34 48.600 82.280 4179.85
4539.52 47.220 81.300 4243.65
4635.05 46.740 82.750 4308.83
4730.23 46.110 81.750 4374.44
4825.07 45.230 81.630 4440.71
4920.78 44.270 82.170 4508.68
5016.33 43.390 79.800 4577.61
5111.37 44.680 76.290 4645.95
5206.23 44.810 76.320 4713.32
5301.20 44.390 75.310 4780.94
5397.24 44.140 73.480 4849.72
5426.92 44.090 73.520 4871.03
5519.00 45.160 73.410 4936.57
Vertical Local Coordinates Global Coordinates
Depth Northings Eastings Northings Eastings
(~) (~) (fi) (fi) (~)
3286.64 159.32 S 84.21 E 5998438.36 N 681396.51 E
3375.01 170.33 S 116.24 E 5998428.14 N 681428.80 E
3461.92 181.02 S 151.40 E 5998418.30 N 681464.21 E
3546.47 191.98 S 189.80 E 5998408.27 N 681502.86 E
3628.90 201.99 S 234.49 E 5998399.35 N 681547.78 E
3708.62 210.02 S 283.75 E 5998392.52 N 681597.22 E
3767.00 215.76 S 334.28 E 5998388.01 N 681647.88 E
3865.97 218.78 S 386.41 E 5998386.25 N 681700.06 E
3943.34 218.96 S 439.93 E 5998387.37 N 681753.57 E
4018.81 216.42 S 495.93 E 5998391.27 N 681809.50 E
4093.12 211.79 S 554.39 E 5998397.31 N 681867.82 E
4163.69 204.68 S 617.58 E 5998405.96 N 681930.83 E
4228.87 195.34 S 686.65 E 5998416.96 N 681999.65 E
4292.67 185.26 S 756.56 E 5998428.74 N 682069.29 E
4357.85 175.57 S 825.72 E 5998440.11 N 682138.20 E
4423.46 166.28 S 894.04 E 5998451.06 N 682206.27 E
4489.73 156.47 S 961.17 E 5998462.49 N 682273.15 E
4557.70 146.98 S 1027.88 E 5998473.60 N 682339.60 E
4626t63 136.62 S 1093.22 E 5998485.54 N 682404.68 E
4694.97 122.92 S 1157.83 E 5998500.80 N 682468.93 E
4762.34 107.11 S 1222.70 E 5998518.18 N 682533.40 E
4829.96 90.77 S 1287.35 E 5998536.08 N 682597.64 E
4898.74 72.74 S 1351.91 E 5998555.67 N 682661.74 E
4920.05 66.87 S 1371.72 E 5998562.02 N 682681.40 E
4985.59 48.46 S 1433.73 E 5998581.93 N 682742.94 E
Alaska State Plane Zone 4
Point Mclntyre Pad 2
Dogleg Vertical
Rate Section
(°~OOft) (ft)
Comment
2.648 37.94
3.120 65.80
1.659 96.76
3.598 130.75
5.080 171.06
2.368 216.31
1.590 263.41
2.248 312.77
2.355 364.24
3.017 418.84
1.327 476.37
6.988 539.13
3.531 608.15
1.639 678.17
1.218 747.38
1.009 815.67
0.932 882.94
1.079 949.73
1.949 1015.44
2.903 1081.34
0.139 1148.07
0.868 1214.73
1.355 1281.76
0.193 1302.42
1.165 1367.09
Continued...
8 December, 1998 - 13:56 - 3 - DrillQuest
Sperry-Sun Drilling Services
Survey Report for P2-08
Your Ref: API-500292289600
Job No. AKMMgO004, Surveyed: 12 November, 1998
Shared Services Drilling Alaska
Prudhoe Bay Unit
Measured Sub-Sea
Depth Incl. Azim. Depth
(ft) (ft)
5538.88 46.040 73.430 4950.48
5632.67 48.860 73.170 5013.89
5728.34 53.550 75.910 5073.82
5821.32 57.000 76.150 5126.78
5918.17 60.320 74.360 5177.15
6012.75 62.340 72.200 5222.53
6106.02 65.560 71.160 5263.48
6202.35 67.910 72.900 5301.53
6296.73 70.340 71.980 5335.16
6390.85 71.450 66.330 5365.99
6485.17 71.570 67.110 5395.90
6580.07 71.510 65.530 5425.95
6673.39 71.500 66.750 5455.56
6768.28 70.740 64.890 5486.26
6861.78 71.040 64.360 5516.87
6958.94 71.170 63.690 5548.34
7054.02 68.620 65.830 5581.02
7147.11 69.710 64.680 5614.13
7240.79 69.630 64.720 5646.68
7334.72 69.830 63,580 5679.22
7428.28 70.210 63.400 5711.19
7522.77 69.990 64.530 5743.35
7618.05 70.460 62.690 5775.59
7713.37 69.760 66.560 5808.03
7808.60 71.020 65.850 5839.99
Vertical Local Coordinates Global Coordinates
Depth Northings Eastings Northings Eastings
(ft) (ft) (ft) (ft) (ft)
4999.50 44.41S 1447.34 E 5998586.31N 682756.45 E
5062.91 24.55 S 1513.51E 5998607.77 N 682822.12 E
5122.84 4.74 S 1585.36 E 5998629.32 N 682893.47 E
5175.80 13.70 N 1659.51E 5998649.55 N 682967.15 E
,5226.17 34.77 N 1739.48 E 5998672.56 N 683046.59 E
5271.55 58.66 N 1818.95 E 5998698.36 N 683125.45 E
5312.50 85.00 N 1898.48 E 5998726.63 N 683204.32 E
5350.55 112.29 N 1982.65 E 5998755.95 N 683287.80 E
5384.18 138.90 N 2066.72 E 5998784.59 N 683371.20 E
5415.01 170.54 N 2149.78 E 5998818.24 N 683453.47 E
5444.92 205.90 N 2231.95 E 5998855.58 N 683534.76 E
5474.97 242.05 N 2314.39 E 5998893.72 N 683616.29 E
5504.58 277.85 N 2395.32 E 5998931.47 N 683696.34 E
5535.28 314.62 N 2477.23 E 5998970.22 N 683777.32 E
5565.89 352.48 N 2557.05 E 5999010.01N 683856.20 E
5597.36 392.74 N 2639.69 E 5999052.26 N 683937.84 E
5630.04 430.82 N 2720.43 E 5999092.29 N 684017.64 E
5663.15 467.24 N 2799.44 E 5999130.61N 684095.74 E
5695t70 504.78 N 2878.86 E 5999170.07 N 684174.22 E
5728.24 543.20 N 2958.15 E 5999210.40 N 684252.56 E
5760.21 582.44 N 3036.84 E 5999251.55 N 684330.27 E
5792.37 621.44 N 3116.67 E 5999292.47 N 684409.13 E
5824.61 661.29 N 3196.98 E 5999334.26 N 684488.45 E
5857.05 699.70 N 3277.94 E 5999374.62 N 684568.46 E
5889.01 735.90 N 3360.02 E 5999412.79 N 684649.64 E
Alaska State Plane Zone 4
Point Mclntyre Pad 2
Dogleg Vertical
Rate Section
(°/'~O0~t) (ft)
Comment
4.427 1381.30
3.014 1450.37
5.386 1524.90
3.717 1601.27
3.774 1683.97
2.928 1766.93
3.595 1850.62
2.950 1939.04
2.731 2027.17
5.793 2115.70
0.795 2204.37
1.581 2293.51
1.240 2381.12
2.020 2469.91
0.624 2557.01
0.666 2647.46
3.415 2735.49
1.644 2821.41
0.094 2908.03
1.158 2994.76
0.445 3081.13
1.148 3168.53
1.883 3256.64
3.888 3344.97
1.498 3433.78
Continued...
8 December, 1998 - 13:56 - 4 - DrillQuest
Sperry-Sun Drilling Services
Survey Report for P2-08
Your Ref: AP1-500292289600
Job No. AKMMgO004, Surveyed: 12 November, ~998
Shared Services Drilling Alaska
Prudhoe Bay Unit
Measured Sub-Sea
Depth Incl. Azim. Depth
(ft) (ft)
7903.41 69.130 67.200 5872.30
7997.43 68.840 66.970 5906.02
8091.49 69.200 68.650 5939.70
8186.46 71.340 70.030 5971.76
8281.08 72.540 68.440 6001.09
8375.12 74.540 67.920 6027.74
8468.55 74.890 70.240 6052.37
8562.90 73.760 67.550 6077.87
8656.18 71.690 64.820 6105.57
8750.22 69.670 65.380 6136.68
8845.06 67.790 66.140 6171.09
8939.21 68.130 62.650 6206.42
9034.84 67.990 65.250 6242.16
9129.53 68.990 63.460 6276.88
9225.44 68.840 65.040 6311.39
9320.17 66.590 65.530 6347.31
9415.49 65.380 68.140 6386.11
9510.76 65.640 68.640 6425.60
9605.92 65.500 69.660 6464.96
9700.37 64.970 70.620 6504.52
9796.06 64.990 69.510 6544.99
9891.72 65.860 71.950 6584.78
9986.29 66.910 71.390 6622.67
10081.18 67.410 73.000 6659.50
10175.64 66.440 73.410 6696.52
Vertical Local Coordinates Global Coordinates
Depth Northings Eastings Northings Eastings
(ft) (ft) (ft) (ft) (ft)
5921.32 771.40 N 3441.77 E 5999450.28 N 684730.50 E
5955.04 805.58 N 3522.61E 5999486.40 N 684810.49 E
5988.72 838.74 N 3603.93 E 5999521.53 N 684890.97 E
6020.78 870.28 N 3687.57 E 5999555.08 N 684973.83 E
6050.11 902.17 N 3771.68 E 5999589.01 N 685057.14 E
6076.76 935.69 N 3855.40 E 5999624.55 N 685140.02 E
6101.39 967.87 N 3939.57 E 5999658.76 N 685223.39 E
6126.89 1000.57 N 4024.31 E 5999693.51 N 685307.31 E
6154.59 1036.52 N 4105.79 E 5999731.42 N 685387.89 E
6185.70 1073.88 N 4186.28 E 5999770.73 N 685467.45 E
6220.11 1110.17 N 4266.86 E 5999808.96 N 685547.13 E
6255.44 1147.88 N 4345.55 E 5999848.57 N 685624.87 E
6291.18 1186.83 N 4425.23 E 5999889.44 N 685703.59 E
6325.90 1224.96 N 4504.64 E 5999929.49 N 685782.05 E
6360.41 1263.84 N 4585.24 E 5999970.31N 685861.68 E
6396.33 1300.49 N 4664.86 E 6000008.88 N 685940.39 E
6435.13 1334.74 N 4744.89 E 6000045.07 N 686019.57 E
6474.62 1366.67 N 4825.50 E 6000078.94 N 686099.37 E
6513198 1397.51 N 4906.46 E 6000111.74 N 686179.57 E
6553.54 1426.64 N 4987.12 E 6000142.82 N 686259.50 E
6594.01 1456.21 N 5068.63 E 6000174.35 N 686340.27 E
6633.80 1484.91 N 5150.75 E 6000205.04 N 686421.66 E
6671.69 1512.16 N 5233.00 E 6000234.28 N 686503.23 E
6708.52 1538.90 N 5316.26 E 6000263.03 N 686585.81E
6745.54 1564.01 N 5399.45 E 6000290.15 N 686668.37 E
Alaska State Plane Zone 4
Point Mclntyre Pad 2
Dogleg Vertical
Rate Section
(°/lOOft) (ft)
Comment
2.401 3522.09
0.384 3609.16
1.711 3696.42
2.636 3785.48
2.040 3875.08
2.192 3964.75
2.424 4054.49
2.995 4144.92
3.568 4233.09
2.220 4320.68
2.118 4408.08
3.455 4494.03
2.526 4581.28
2.051 4668.05
1.545 4756.16
2.423 4842.73
2.805 4929.05
0.550 5015.29
0.987 5101.58
1.080 5187.11
1.051 5273.59
2.492 5360.40
1.236 5446.96
1.650 5534.35
1.102 5621.23
Continued...
8 December, 1998 - 13:56 - 5 - DrillQuest
Sperry-Sun Drilling Services
Survey Report for P2-08
Your Ref: API-500292289600
Job No. AKMMgO004, Surveyed: 12 November, 1998
Shared Services Drilling Alaska
Prudhoe Bay Unit
Measured Sub-Sea
Depth Incl. Azim. Depth
(ft) (ft)
10271.01 66.370 74.000 6734.70
10365.33 66.040 77.120 6772.76
10460.42 63.510 79.910 6813.29
10554.44 64.090 79.150 6854.80
10649.09 64.440 79.140 6895.89
10744.13 64.260 79.960 6937.04
10837.07 64.420 77.560 6977.29
10914.70 65.100 78.120 7010.39
11009.93 65.340 77.500 7050.30
11102.11 64.490 75.330 7089.39
11196.46 64.390 74.330 7130.10
11293.19 63.370 73.040 7172.68
11385.63 63.440 71.950 7214.07
11480.40 65.280 73.850 7255.08
11573.95 65.310 72.930 7294.18
11668.68 65.240 73.220 7333.80
11761.19 65.630 71.240 7372.26
11854.05 65.620 71.910 7410.58
11946.82 65.580 72.210 7448.91
12043.33 65.680 70.020 7488.74
12139.02 68.220 72.510 7526.20
12233.78 68.460 72.590 7561.18
12328.78 68.650 73.840 7595.91
12423.02 68.830 74.150 7630.08
12516.62 68.930 72.280 7663.81
Vertical Local Coordinates Global Coordinates
Depth Northings Eastings Northings Eastings
(ft) (ft) (ft) (ft) (ft)
6783.72 1588.53 N 5483.34 E 6000316.70 N 686751.64 E
6821.78 1610.05 N 5566.90 E 6000340.24 N 686834.65 E
6862.31 1627.20 N 5651.18 E 6000359.43 N 686918.49 E
6903.82 1642.53 N 5734.13 E 6000376.77 N 687001.05 E
o6944.91 1658.58 N 5817.87 E 6000394.85 N 687084.37 E
6986.06 1674.12 N 5902.12 E 6000412.43 N 687168.22 E
7026.31 1690.45 N 5984.28 E 6000430.75 N 687249.96 E
7059.41 1705.24 N 6052.92 E 6000447.20 N 687318.22 E
7099.32 1723.50 N 6137.43 E 6000467.50 N 687402.27 E
7138.41 1743.10 N 6218.58 E 6000489.07 N 687482.91 E
7179.12 1765.38 N 6300.72 E 6000513.32 N 687564.50 E
7221.70 1789.77 N 6384.08 E 6000539.73 N 687647.23 E
7263.09 1814.63 N 6462.91E 6000566.50 N 687725.43 E
7304.10 1839.74 N 6544.56 E 6000593.58 N 687806.46 E
7343.20 1864.03 N 6626.00 E 6000619.85 N 687887.28 E
7382.82 1889.08 N 6708.32 E 6000646.89 N 687968.97 E
7421.28 1914.76 N 6788.44 E 6000674.50 N 688048.44 E
7459.60 1941.50 N 6868.68 E 6000703.17 N 688128.01 E
7497~93 1967.52 N 6949.06 E 6000731.14 N 688207.73 E
7537.76 1995.97 N 7032.23 E 6000761.60 N 688290.19 E
7575.22 2024.23 N 7115.61 E 6000791.87 N 688372.86 E
7610.20 2050.64 N 7199.62 E 6000820.32 N 688456.21 E
7644.93 2076.17 N 7284.28 E 6000847.90 N 688540.22 E
7679.10 2100.39 N 7368.70 E 6000874.15 N 688624.03 E
7712.83 2125.60 N 7452.29 E 6000901.39 N 688706.98 E
Alaska State Plane Zone 4
Point Mclntyre Pad 2
Dogleg Vertical
Rate Section
(°/~OOft) (ft)
Comment
0.572 57O8.62
3.047 5794.89
3.758 5880.66
0.952 5964.67
0.370 6049.63
0.800 6134.94
2.334 6218.45
1.092 6288.54
0.643 6374.84
2.323 6458.26
0.962 6543.37
1.596 6630.21
1.057 6712.83
2.653 6798.23
0.894 6883.21
0.288 6969.23
1.992 7053.31
0.657 7137.80
0.298 7222.21
2.070 7309.98
3.575 7397.90
0.265 7485.92
1.241 7574.33
0.361 7662.15
1.867 7749.45
Continued...
8 December, 1998 - 13:56 - 6 - DrillQuest
Sperry-Sun Drilling Services
Survey Report for P2-08
Your Ref: AP1-500292289600
Job No. AKMMgO004, Surveyed: 12 November,
Shared Services Drilling Alaska
Prudhoe Bay Unit
Measured Sub-Sea
Depth Incl. Azim. Depth
(ft) (ft)
12610.74 68.950 72.620 7697.63
12706.21 69.040 72.210 7731.86
12801.00 69.170 72.670 7765.66
12895.05 68.490 73.600 7799.63
12989.77 67.360 74.770 7835.23
13083.80 67.480 76.410 7871.33
13177.84 67.580 73.970 7907.28
13271.96 67.560 74.490 7943.19
13366.88 67.640 73.570 7979.36
13461.28 67.760 75.160 8015.19
13557.06 66.800 76.550 8052.18
13651.45 65.310 74.280 8090.49
13747.25 64.990 73.600 8130.75
13841.37 64.950 71.610 8170.58
13937.01 64.770 71.810 8211.21
14031.74 64.820 72.540 8251.55
14126.41 65.090 70.100 8291.63
,'~ 14221.31 65.270 69.550 8331.47
14316.89 66.970 71.430 8370.16
14412.10 68.050 72.550 8406.58
14506.59 68.150 70.920 8441.83
14520.49 68.180 70.640 8447.00
14615.53 68.310 70.170 8482.22
14714.64 66.210 71.450 8520.54
14809.08 65.440 70.710 8559.21
Vertical Local Coordinates Global Coordinates
Depth Northings Eastings Northings Eastings
(ft) (ft) (ft) (ft) (ft)
7746.65 2152.09 N 7536.03 E 6000929.90 N 688790.06 E
7780.88 2179.01 N 7620.99 E 6000958.88 N 688874.34 E
7814.68 2205.73 N 7705.42 E 6000987.63 N 688958.09 E
7848.65 2231.18 N 7789.35 E 6001015.11N 689041.38 E
7884.25 2255.10 N 7873,80 E 6001041.07 N 689125.22 E
7920.35 2276.71N 7957.89 E 6001064.71N 689208.76 E
7956.30 2298.92 N 8041.89 E 6001088,96 N 689292.20 E
7992.21 2322.56 N 8125.62 E 6001114.63 N 689375,33 E
8028.38 2346.71 N 8209,99 E 6001140.81 N 689459,09 E
8064.21 2370,24 N 8294.09 E 6001166,38 N 689542.60 E
8101.20 2391,84 N 8379.76 E 6001190.05 N 689627.71E
8139.51 2413,55 N 8463.23 E 6001213.78 N 689710.64 E
8179.77 2437,60 N 8546.77 E 6001239.84 N 689793.57 E
8219.60 2463.09 N 8628.15 E 6001267.30 N 689874.30 E
8260.23 2490.26 N 8710.35 E 6001296.46 N 689955.83 E
8300.57 2516.50 N 8791.95 E 6001324.67 N 690036.76 E
8340.65 2543.97 N 8873.19 E 6001354.10 N 690117.31 E
8380.49 2573.67 N 8954.04 E 6001385.76 N 690197.42 E
8419~18 2602.85 N 9036.41E 6001416.93 N 690279.06 E
8455160 2630.04 N 9120.07 E 6001446.15 N 690362.03 E
8490.85 2657.52 N 9203.32 E 6001475.63 N 690444.59 E
8496.02 2661.77 N 9215.50 E 6001480,18 N 690456.67 E
8531.24 2691.37 N 9298.66 E 6001511.79 N 690539.08 E
8569,56 2721.42 N 9384.98 E 6001543.92 N 690624.65 E
8608.23 2749.36 N 9466.48 E 6001573.83 N 690705.45 E
Alaska State Plane Zone 4
Point Mclntyre Pad 2
Dogleg Vertical
Rate Section
(°/'~OOft) (ft)
Comment
0.338 7837.23
0.412 7926.31
0.474 8014.82
1.172 8102.50
1.653 8190.28
1.615 8277.07
2.400 8363.95
0.511 8450.95
0.900 8538.71
1.564 8626.04
1.672 8714.36
2.706 8800,60
0.726 8887.52
1.916 8972.76
0.267 9059,25
0.699 9144.90
2.352 9230.55
0.559 9316.42
2.529 9403.62
1,571 9491.51
1.604 9579.09
1.882 9591.97
0.479 9680.04
2.431 9771.27
1.084 9857.29
Continued...
8 December, 1998 - 13:56 - 7 - DrillQuest
Sperry-Sun Drilling Services
Survey Report for P2-08
Your Ref: AP1-500292289600
Job No. AKMM90004, Surveyed: 12 November, ~998
Shared Services Drilling Alaska
Prudhoe Bay Unit
Measured Sub-Sea
Depth Incl. Azim. Depth
(ft) (ft)
Vertical Local Coordinates Global Coordinates
Depth Northings Eastings Northings Eastings
(ft) (ft) (ft) (ft) (ft)
14904.15 64.370 70.030 8599.53 8648.55 2778.28 N 9547.57 E 6001604.71 N 690785.81 E
14999.33 63.090 72.000 8641.66 8690.68 2806.05 N 9628.27 E 6001634.43 N 690865.81 E
15094,86 62.350 71.540 8685.45 8734.47 2832.61 N 9708.91 E 6001662.94 N 690945.78 E
15189.52 61.090 71.250 8730.29 8779.31 2859.20 N 9787.92 E 6001691.44 N 691024.12 E
15281.62 60.020 71.600 8775.57 8824.59 2884.75 N 9863.94 E 6001718.83 N 691099.50 E
,
15378.59 59.000 70.670 8824.77 8873.79 2911.77 N 9943.01 E 6001747.75 N 691177.89 E
15473,24 58.230 69.990 8874.06 8923.08 2938.96 N 10019.10 E 6001776.79 N 691253.30 E
15566.59 57.030 69.890 8924.04 8973.06 2966.00 N 10093.16 E 6001805.62 N 691326.68 E
15662.62 55.690 70.000 8977.24 9026.26 2993.42 N 10168.26 E 6001834.85 N 691401.09 E
15756.81 54.870 69.970 9030.88 9079.90 3019.92 N 10241.00 E 6001863.10 N 691473.17 E
15851.10 54.900 70.230 9085.12 9134.14 3046.17 N 10313.52 E 6001891.11 N 691545.03 E
15904.70 54.690 69.880 9116.02 9165.04 3061.11 N 10354.69 E 6001907.04 N 691585.83 E
15971.00 54.690 69.880 9154.34 9203.36 3079.72 N 10405.49 E 6001926.88 N 691636.16 E
All data is in feet unless otherwise stated. Directions and coordinates are relative to True North.
Vertical depths are relative to Well. Northings and Eastings are relative to Well.
' Magnetic Declination at Surface is 28.016° (30-Oct-98)
I
The Dogleg Severity is in Degrees per 100ft.
Vertical Section is from Well and calculated along an Azimuth of 74.296° (True).
Based upon Minimum Curvature type calculations, at a Measured Depth of 15971.00ft.,
The Bottom Hole Displacement is 10851.68ft., in the Direction of 73.513° (True).
Alaska State Plane Zone 4
Point Mclntyre Pad 2
Dogleg
Rate
(°/100ft)
Vertical
Section
(ft)
Comment
1.299
2.292
0.885
1.358
1.208
1.338
1.019
1.289
1.399
0.871
0.228
0.662
0.000
9943.18
10028.38
10113.20
10196.46
1O276.56
10359.99
10440.59
10519.21
10598.93
10676.12
10753.05
10796.72
10850.67
Projected Survey
Continued...
8 December, 1998 - 13:56 - 8 - DrillQuest
Sperry-Sun Drilling Services
Survey Report for P2-08
Your Ref: API-500292289600
Job No. AKMM90004, Surveyed: 12 November, 1998
Shared Services Drilling Alaska
Prudhoe Bay Unit
Alaska State Plane Zone 4
Point Mclntyre Pad 2
Comments
Measured Station Coordinates
Depth TVD Northings Eastings
(ft) (ft) (ft) (ft)
960.00 958.68 30.32 S 16.59 W
15971.00 9203.36 3079.72 N 10405.49 E
Comment
Tie-on Survey
Projected Survey
8 December, 1998 - 13:56 - 9 - DrillQuest
n I:! I I_1_ I I~1 G S E I::i ~J I r" E S
08-Dec-98
AOGCC
Lori Taylor
3001 Porcupine Drive
Anchorage, AK 99501
Re: Distribution of Survey Data for Well P2-08
Dear Lori Taylor:
Enclosed are two survey hard copies.
Tie-on Survey:
Window / Kickoff Survey:
Projected Survey:
960.00' M D
'MD
15,971.00' MD
(if applicable)
Please call me at 563-3256 if you have any questions or concerns.
Regards,
William T. Allen
Survey Manager
Attachment(s)
5631 Silverado Way, Suite G · Anchorage, Alaska 99518 · (907) 273-3500 · Fax (907) 273-3535
A Halliburton Company
MEMORANDUM State of Alaska
TO:
THRU:
David Johnst~
Chairman
Blair Wondzell,
P. I. Supervisor
Alaska Oil and Gas Conservation Commission
DATE: November 16, 1998
FILE NO: a29kkpfe.doc
FROM: Chuck Scheve, ~ × SUBJECT:
Petroleum Inspector
BOPE Test
Nabors 33E
Point Mcintyre PM2-08
PTD # 98-123
Monday November 16, 1998: I traveled to Nabors Rig 33E drilling the PM2-08 well
and witnessed the weekly BOPE test.
As the attached AOGCC BOPE test report indicates the test lasted 2.5 hours with
one failure. The kill line hose utilizes a 1502 hammer union type connection. I
disscused this with toolpusher Danny Herbert and he agreed to change the union to
a flanged connection before comencing operations on the next well.
The rig was clean and ali related equipment appeared to be in good working order.
The location was well organized allowing good access to the rig.
Summary: I witnessed the weekly BOPE on Nabors rig 33E drilling the Point
Mclntyre PM2-08 well.
Nabors 33E, 11/16/98, Test Time 2.5 hours, one failure
Attachment: a29kkpfe.xis
X Unclassified
Confidential (Unclassified if doc. removed )
Confidential
STATE OF ALASKA
OIL AND GAS CONSERVATION COMMISSION
BOPE Test Report
OPERATION: Drlg: X Workover: DATE:
Drlg Contractor: Nabors Rig No. 33E PTD # 98-123 Rig Ph.#
Operator: SSD Rep.: Charlie Dixon
Well Name: PM2-08 Rig Rep.: Dan Herbert
Casing Size: Set @ Location: Sec. If T. 12N R. f4E Meddian UM
Test: Initial Weekly X Other
11/16/98
659-4787
Test
VliSC. INSPECTIONS:
Location Gen.: OK
Housekeeping: OK (Gen)
PTD On Location YES
~tanding Order Posted YES
Well Sign OK
Drl. Rig OK
Hazard Sec. OK ·
FLOOR SAFETY VALVES:
Upper Kelly / IBOP
Lower Kelly / IBOP
Ball Type
Inside BOP
Quan. Pressure P/F
I 250/5,000 P
1 250/5,000 P
I 250/5,000 P
1 250/5,000 P
BOP STACK:
Annular Preventer
Pipe Rams
Lower Pipe Rams
Blind Rams
Choke Ln. Valves
HCR Valves
Kill Line Valves
Check Valve
Quan. Test Press. P/F
P
250/3500
250/5,000
250/5,000
250/5,000
250/5,000
250/5,000
250/5,000
N/A
P
P
P
P
2 P
P
CHOKE MANIFOLD:
No. Valves
No. Flanges
Manual Chokes
Hydraulic Chokes
Test
Pressure P/F
14 250/5,000 P
34 250/5,000 P
1
Functioned
Functioned
ACCUMULATOR SYSTEM:
System Pressure 3000I
Pressure After Closure 1500
MUD SYSTEM: Visual Alarm 200 psi Attained After Closure minutes 20 sec.
Trip Tank OK OK System Pressure Attained 3 minutes 30 sec.
Pit Level Indicators OK OK Blind Switch Covers: Master: OK Remote: OK
Flow Indicator OK OK Nitgn. Btl's: 4 (f~ 2100 PSI
Meth Gas Detector OK OK , Psig.
H2S Gas Detector OK OK '
Number of Failures: 0 ,TestTime: 2.5 Hours. Number of valves tested 24 Repair or Replacement of Failed
Equipment will be made within 0 days. qofify the Inspector and follow with Wdtten or Faxed verification to
the AOGCC Commission Office at: Fax No. 276-7542 Inspector North Slope Pager No. 659-3607 or 3687
If your call is not returned by the inspector within 12 hours please contact the P. !. Supervisor at 279-1433
REMARKS:
Hammer union on kill line needs to be replaced with non threaded connection befor next well.
Distribution:
odg-Well File
c - Oper./Rig
c - Database
c - Trip Rpt File
c - Inspector
FI-O21L (Rev. 12J94)
STATE WITNESS REQUIRED?
YES X NO
24 HOUR NOTICE GIVEN
YES X NO
Waived By:
Witnessed By:
a29kkpfe
Chuck Scheve
TONY KNQWI_E$, GOVERNOR
AI,ASK~ OIL ~X~D GAS
CONSERVATION COMMISSION
3001 PORCUPINE DRIVE
ANCHORAGE. ALASKA 99501-3192
PHONE: ig0T) 279-1433
..--'.'-%X: 907') 276-7542
October 14. 1998
Lowell Crane
Drilling Engineering Supcrvisor
ARCO Alaska. Inc.
P O Box 196612
Anchorage. AK 99519-6612
Point Mclntvrc P2-08
ARCO Alaska. Inc.
Permit No: 98-123
Sur Loc: lS'NSL. 1073'WEL. Sec. i i. T12N. R14E. UM
Btmholc Loc. j096'NSL. 1110'WEL. Sec. 07. T12N. R15E. UM
Dear Mr. Crane:
Enclosed is the approved revised application for permit to drill thc above referenced xx'cll. The
revision is for a change ~n bottom-hole location.
The provisions of thc original approved permit dated July:.. -~ ~, 998 arc m effect for this revision.
David W. Johnston
Chainnan
BY ORDER OF THE COMMISSION
dlf/Enclosurcs
cc:
Dcpartmcnt of Fish & Game. Habitat Section W/o cncl
Dcpartmcnt of Environmcntal Conservation xv/o cncl
" STATE OF ALASKA
ALASKA--,~J,L AND GAS CONSERVATION CO --rv~.-.-¢llSSION
PERMIT TO DRILL
20 AAC 25.005 REVISED 10/01/98
la. Type of work [] Drill [] Redrill Ilb. Type of well [] Exploratory [] Stratigraphic Test [] Development Oil
I--I Re-Entry [] Deepenl [] Service I--I Development Gas [] Single Zone [] Multiple Zone
2. Name of Operator 5. Datum Elevation (DF or KB) 10. Field and Pool
ARCO Alaska Inc. Plan RTE = 49.0' Point Mclntyre
3. Address 6. Property Designation
P.O. Box 196612, Anchorage, Alaska 99519-6612 ADL365548
4. Location of well at surface 7. Unit or Property Name 11. Type Bond (See 20 AAC 25.025)
18' NSL, 1073' WEL, SEC. 11, T12N, R14E, UM Point Mclntyre
At top of productive interval 8. Well Number Number U-630610
2915' NSL, 842' WEL, SEC. 7, T12N, R15E, UM P2-08
At total depth 9. Approximate spud date Amount $200,000.00
3096' NSL, 1110' WEL, SEC. 7, T12N, R15E, UM 10/20/98
12. Distance to nearest property line113. Distance to nearest well 14. Number of acres in property 15. Proposed depth (MD and TVD)
ADL388469, 1110'I P2-09, 9.39' at 699' MD 3601 16145' MD / 9176' TVD
16. To be completed for deviated wells 17. Anticipated pressure {see 20 AAC 25.035 (e) (2)}
Kick Off Depth 2206' MD Maximum Hole Angle 7o° Maximum surface 3467 ps/g, At total depth (TVD) 8800' / 4347 psig
18. Casing Program Specifications Setting Depth
Size Top Bottom Quantity of Cement
Hole Casing Weight Grade Coupling Length MD TVD MD TVD (include stage data)
30" 20" 133# H-40 BTC 80' 36' 36' 116' 129'116' Driven
12-1/4" 9-5/8" 40# L-80 BTC-Mod 5316' 35' 35' 5351' 4949' 1544 sx Coldset III, 456 Class "G'
8-3/4" 7" 26# L-80 BTCM 15456' 34' 34' 15490' 8905' 271 sx Class 'G'
8-3/4" 7" 29# 13CR BTCM 655' 15490' 8905' 16145' 9176'
19. To be completed for Redrill, Re-entry, and Deepen Operations.
Present well condition summary
Total depth: measured feet Plugs (measured)
true vertical feet 0 ~j~ ~' F%i.~ ~ !~ :~ ~
Effective depth: measured feet Junk (measured)~ \ i ~;~ ~_~.~ ~ ~ ~ ~ \i ~ ,
true vertical feet
Casing Length Size Cemented MD TVD
Structural
Conductor
Surface
Intermediate
Production REQUEST FOR DIVERTER WAIVER
LinerRECEIVED
0CT 0 1998
Perforation depth: measured
AJaska Oil 8, Gas Cons. Commission
true vertical Anchorage
20. Attachments [] Filing Fee [] Property Plat [] BOP Sketch [] Diverter Sketch [] Drilling Program
[] Drilling Fluid Program []Time vs Depth Plot [] Refraction Analysis [] Seabed Report [] 20 AAC 25.050 Requirements
Contact Engineer Name/Number: Justin Balkenbush, 564-5238 ~ Prepared By Name/Number: Carol W/they, 564-4114
certify that the f~ regoing is tru, d orrect to the best of my knowledge
21. I hereby
Signed Lowell ~me Drilling Engineering Supervisor Date /O-~--?,~
~' - Commission Use Only
Permit Number I APl Number Approval D.a~..~ I See cover letter
98-123 50-029-22896 '~ "'c~ '"~' ~ for other requirements
Conditions of Approval: Samples Required []Yes .~ No Mud Log Required []Yes '~ No
Hydrogen Sulfide Measures [~,Yes~,io Directional Survey Required ~]Yes I--INo
Required Working Pressure for BOPE []2K; []3K; 1--14K; [~5K; [--I10K; [--115K
Other:
by order of
Approved By Original Signed By Commissioner the commission Date/'
u,_ , ! _ .~ J I I _~._ ._
Form 10-401 Rev. 12-01-85
David W. Johnston
Submit In Triplicate
I Well Name: I P2-08
I Type of Well (producer or injector): I Producer
Surface Location' 18' FSL, 1073' FWL, T 12N, R 14E, S 11
Target Location: 2915' FSL, 842' FWL, T 12N, R 15E, S 7
Bottom Hole Location: 3096' FSL, 1110' FWL, T 12N, R 15E, S 7
I AFE Number:
12C0130
IEstimated Start
Date:
I MD: 116145'
10/20/98
I Rig: I NABORS33E
Days to complete
24 days
I TVD: 19 76' I I RTE: 149.0
I Well Design (conventional, slimhole, etc.): I Ultra-Slimhole 7" Longstring, 3 1/2" 13 Cr
tbg
Formation Markers:
Formation Tops MD TVD
Base of 1789' 1783'
Permafrost
SV4 3807' 3719'
SV1 (-1'3) 5197' 4739'
9 5/8" Casing 5351' 4849' 9-5/8" csg shoe below SV1 & above
Point K-15
K15 (Ugnu) 5854' 5189'
West Sak 10921' 7074' 9.5 ppg minimum mud weight
required.
HRZ/K-10 15717' 8999' K-10/HRZ same depth. 9.6-9.9 EMW
to this depth. 3% 10.5 ppg KCI GEM
System at 500' ABOVE K-10. 10.5 for
the 70 degrees in the HRZ.
Kalubik 15754' 9014'
Kuparuk 15790' 9029'
OWC 16005' 9118'
TD 16145' 9176' 140' Md Below the OWC.
Casing/Tubing Pro~, ram:
Hole Cs~/Tbg' Wt/Ft Grade Conn Length Top Btm
Size O.D, MD/TVD MD/TVD
30" 20" 133# H40 BTC 80' 36'/36' 116'/116'
12 1/4" 9 5/8" 40# L-80 BTC-Mod 5316' 35'/35' 5351 '/4949'
8 3/4" 7" 26# L-80 BTC M 15456' 34'/34' 15490'/8905'
8 3/4" 7" 29# 13 Cr BTCM 655' 15490'/8905' 16145'/9176'
Tubing 3 1/2" 12.6# 13 Cr NSTC 15657' 33'/33' 15690'/8988'
Mud Program:
Surface Mud Properties: Spud 112 1/4" hole section
Density (ppg) IFunnel Vis I Yield Point 10 sec gel I10 min gel
8.7-9.5 ~ 100-300 30-70 20-60 40-80
pH I Fluid Loss
9-10 15 - 25cc
Production Mud Properties: LSND 18
Density (PPg) I Funnel Vis I Yield Point
8.8-9.9 I 40-55I 18-22
Production Mud Properties: 3% KCL
Density (ppg) I Plastic Vis Yield Point
10.5 I 8-15 15-25
3/4" hole section
10 sec gel 110 min gel pH Fluid Loss
5-15I < 30 9.0-9.5 4-6cc
8-3/4" hole section, GEM
10 sec gel 10 min gel
8-15 < 30
pH
9.0-9.5
Fluid<5ccLOSsI
Cement Data:
Casing First Stage: Second Stage: Comments
Sxs/VVt/Yield Sxs/Wt/Yield
9-5/8" surface Coldset II1: 979/12.2/1.92 Two stage iob:
casing 565/12.2/1.92 (assumes 200% First stage Coldset III lead from
to 5351 '. excess in 2000'-4308' @ 50% excess
ES cementer Class G: permafrost) followed by Class G tail from
@ at 2000' 456/15.8/1.15 shoe to 4308' (750' TVD) @ 50%
MD. excess + 80' shoe.
Second stage Coldset III
circulated to surface.
Casing/Liner Lead:Sxs/W~ield Tail:Sxs/Wt/Yield Comments
7" none 271/15.8/1.19 Class "G". Volume based on
cement to 1000' above the
Kuparuk with 50% excess + 80'
shoe.
Logging Program:
I Open Hole Logs:
I Cased Hole Logs:
12 1/4" MWD/multi-shots as needed for directional survey.
MWD/LWD GR/RES to 500' above K-10.
MWD/LWD GR/RES/DEN/NEU (Triple Combo) to TD. Gyro if
requested.
GR/CBT-CET (contingent on cmt job mechanics).
Well Control:
Well control equipment consisting of 5000 psi W.P. pipe rams, blind rams, and annular preventer
will be installed and is capable of handling maximum potential surface pressures.
It is requested that the diverter be waived for this well. The diverter would point at Manifold
buildings or other wells with the design of N-33E. There has never been any surface gas
reported in any of the PM-2 drilling programs. All 1998 wells have been drilled with no issues.
BOPE and drilling fluid system schematics are on file with AOGCC.
Directional: '-- .... ~--~
KOP: 2206' MD
Maximum Hole Angle:
Close Approach Wells:
70 degrees @ 6,210'
P2-07 11.13' Allowable Deviation at 602' MD (SI thru SSSV)
P2-09 9.39' Allowable Deviation at 699'MD (SI thru SSSV)
P2-11 Must not bring on line until Surface Csg set on P2-08
P2-30 Must be Risk based (close approach at -~ 7,200')
P2-32 Must be Risk based and SI (close approach at - 9,500')
P2-40 Must not bring on line until Surface Csg set on P2-08
Drilling and Completion Scope
1. Move rig to P2-08. NU riser and flowlines.
2. Drill 12-1/4" surface hole to 5351' MD.
3. Run and cement 9 5/8" casing. Cement to surface.
4. RIH with 8-3/4" bit, MWD DIR/LWD GR/Res to float collar.
5. PT casing to 3000 psi for 30 min. Record on chart. L.~/
d. Drill out 20', perform LOT. Record on chart. /
?. Drill 8-3/4" production hole to 500' MD above the K-10. Trip and swap to LWD triple combo
BHA. Swap to 10.5 PPG 3% KCI/GEM system on this trip.
8. Drill 8-3/4" production hole to 16145' MD. PDC bits will be used to drill this section.
9. Perform a Wiper Trip.
]0. Circulate and Condition Mud, POOH to Run 7" Longstring.
11. Run/cement 7" long string.
12. Circulate well to kill weight filtered brine. Perforate via DPC guns.
13. Kill well, Run 3 1/2" 13Cr tubing with 7"x4 1/2" packer w/XO's, 3 1/2" SSSV, and 3 1/2"x11/2"
GLMs.
]4. Secure well, RDMO.
Drilling Hazards/Contingencies
· The original reservoir pressure is 4377 psi at 8800' ss. The expected reservoir pressure is
4347 psi at 8800' ss. Abnormally pressured formations are not expected in this well. The
10.5 ppg mud will overbalance the anticipated pressure by 458 psi.
· Tight hole has been experienced in the lower Sagavanirktok, below the surface casing shoe
which were set into the SV4 sand. This has caused stuck pipe incidents and bit/BHA bailing
Gumbo problems.
· Coal stringers/SV Sands in the lower Ugnu have caused stuck pipe.
· No major instances of lost circulation problems have occurred on Pt Mac 2 wells.
Disposal
· Cuttings Handling: Cuttings should be hauled to the ball mill at CC-2A.
Fluid Handling: Haul all drilling and completion fluids and other Class II wastes to CC-2A for
injection. Haul all Class I wastes to Pad 3 for disposal. In addition, haul all cuttings from
drilling operations to CC-2A for disposal, except any metal cuttings which will be sent to the
North Slope Borough.
SK 9/30/98
TREE: 4-1/16"- 5M chromeP2-08RT-GL- 36.2'
WELLHEAD: 11" X 11" - 5M FN ........ GL-SL - 12.8'
~" ::":"': ...................... ' ..... ~ -- 3-1/2" TRDP 4 2000'
4000' (top glm) ~ m
9-5/8", 40#/It, L-80 [ 5351' ~ a ....... " k
BTC
........................
KOP: 2206' · ;i::::;ili::i;i:i;;;;;;:::;;;;ii:;;; GAS LIFT MANDRELS
'~ (Camco 3-1/2x I - 1/2"/
MAX ANGLE: 70° @ 6211' MD ~ N° MD(BKB) TVDss
; r~ 1 tbd
....................... 2 II
3 1/2" 12.6# 13 Cr NSCT 4 ,,
-1TUBING
5
CAPACITY: 0.00914 ~ ~ 6 "
BBL/FT 7 ,, 40' MD above
~:~ .....................
packer
PI=RFOFIATIONRef Loll: SUMMARY:
Size Interval SPF Open/Sqzd
tbd
.......................
.........................
:::::::::::::::::::::::::::::::::::
--TOP OF CHROME 7" = 15490'
L-80 Mod BTC / 13CR
..... ............
..............
".T:'~:i:!:~:~:
%'.".~'"'"' ~
.:
I 7,, Packer,OCr
[~- 15660'
l;:!i.?i;~:.::::i] -- 3-1/2" 'X' Nipple 15670'
,l!;;:?ii;iiil x _ 3-1/2" 'XN' Nipple 15680'
g ~'- 3-1/2" WLEG 15690'
~ CHROME
MARKER JOINT (20') ABOVE
KUPARUK BUT BELOW TT.
DATE REV. BY COMMENTS Point Mclntyre
WELL: P2-08
9/29/98 SE PLANNED APl NO: 50-029-
COMPLETION
Shared Services Drilling
~.~-?~-~ ~u~. u~':b~ ~'rl EI~Ir.I~NY-~UN RL~SK(t Ft~X NO, 1@075835754 P, 02
~=I=~=~I~['==Ul;1 ' BP EXPLORATION (ALASKA) INC. DrillQ uest
~-"-'~'~.[~.?'~'2~_~ce'~ Well: P2-08 (R) Wp2
,
0 -- /Start DIr @ 1.000°/100fl: 400.00ti MD, 400.00[I ltKaH°rlz°nlalElavallonC°°rdlnat~=: OOO0000.Oo00.~ N.ii 0~XX)O0.00Rig(EST) E Created By:
i ~ O0.00 Il Well (CBE)
~f, oo 0o
,/ Coordinate Syabll~
t~l:g[r:~lli).~l'1~l~p.!llm§.,~'t[Y~), 1218.981t TVD ' ,%~"~Oll~-~i-Tqlllj~ {,iUmmary __
·
,1600 -- /,End Dir: 1822.22[l MD, 1816.51[ITV0
PZ-HE ?I . ~'iI~ pER[,F/'A'r~T 'I'VDRKB
...............................................................................................
, ~ Dir @ 1,500°/100fl: 2205.7111 MD, 2200.0011TVO 8230.Z~N,45~.36£
,~?~Rate Increase ~ 2.500~/100[!: 2739~04[I MD, 2781.60ft TVD
~ '151r Rate Increase ~ 3.000'/1 0 t: 3300.92 I M , 3273.001
~200 - goo.oo
............ ~~ m¥.~.~mru~;~=o.wo ................................................. ~z~
.......... ~ .................................................................................... T~p
.............. ~oo oo ~.
~ ~- ' Sail ~ ~.000~ Inclination on 84.000" Azimuth
~ 9 5/8" Casing
........................
~o,oo ~o.oo_
~0.00
~ ~0.00
~4OO ' ~o.oo
~ 10500.~
I I I I
0 ~ 600 3200 ~00
Scale: linch = t600ffi Section ~imuth= 73.760' (True No~h}
Ve~ical Section
i~o.oo
~ ~o.oo
00~010800 ~ ~MI
'
::: ::::: ::::::: :: :::: ::: :~~.~: ::: :::::: :;::::: :::::::: ::::::: ::: ::::::: :::::::::::: ::: ::::::::::::
~7200 ~oo.oo '
~ ~o~oo
00,00 -- ~.00
800 ~3~.~ 7" Casing
~~~145.13It MD, 9176.031t TVD
~ ::::::::::::::::::::::::::::::: .... ::::::::::::::::::::::::::::::::::::::: .......... :::::::~:~
~ I I ~ 9021,809028,~0
~00 6400 8000 9600 684.91
Scale: iinch = 160Oft Section ~imath= 73,760' (True No~h)
,,, ~_~:__: =__~: ........
Shared Services Drilling
Point Mclntrye
Measured
Depth
(ft)
Incl. Azim.
Sub-Sea
Depth
(ft)
Vertical
Depth
(ft)
0.00 0.000 0.000 -48.80 0.00
400.00 0.000 0.000 351.20 400.00
500.00 1.000 190.000 451.19 499.99
600.00 2.000 190.000 551.16 599.96
700.00 3.000 190.000 651.06 699.86
800.00 4.000 190.000 750.88 799.68
900.00 5,099 202.987 850.56 899.36
1000.00 6.364 211.117 950.06 998.86
1100.00 7.713 216.491 1049.31 1098.11
1192,22 9.000 220.000 1140,55 1189.35
1222.22 9.000 220.000 1170.18 1218.98
1300.00 7.833 220.000 1247.12 1295.92
1400.00 6.333 220.000 1346.35 1395.15
' 1500,00 4,833 220.000 1445.87 1494.67
1600.00 3.333 220,000 1545.62 1594.42
1700.00 1.833 220.000 1645.51 1694.31
'1789.51 0.491 220.000 1735.00 1783.80
1800,00 0.333 220.000 1745.49 1794.29
1822.22 0.000 0.000 1767.71 1816.51
1882.22 0.000 0.000 1827.71 1876.51
2205.71 0.000 0.000 2151.20 2200.00
2300.00 1.414 115.000 2245.48 2294.28
2400.00 2.914 115.000 2345.41 2394.21
2500.00 4.414 115.000 2445.20 2494.00
2600.00 5.914 115.000 2544.79 2593.59
2700.00 7.414 115.000 2644.11 2692,91
2739.04 8.000 115.000 2682.80 2731.60
2800.00 9.512 113.760 2743.05 2791.85
2900.00 12.000 112.398 2841.28 2890.08
3000.00 14.491 111.498 2938.62 2987.42
Sperry-Sun Drilling Services
Proposal Report for P2-08 (R) WP2
Local Coordinates
Northings Eastings
(~) (~)
0.00 N 0.00 E
0.00 N 0.00 E
0.86 S 0.15 W
3.44 S · 0.61 W
7.73 S 1.36 W
13.74 S 2.42 W
21.27 S 4.76 W
30.11 S 9.37 W
40.25 S 16.22 W
50.75 S 24.54 W
54.35 S 27.55 W
63.07 S 34.87 W
72.51 S 42.80 W
79.97 S 49.05 W
85.42 S 53.63 W
88.87 S 56.53 W
90.26 S 57.69 W
90.32 S 57.74 W
90.37 S 57.78 W
90.37 S 57.78 W
90.37 S 57.78 W
90.86 S 56.73 W
92.46 S 53.31 W
95.16 S 47.51 W
98.96 S 39.36 W
103.87 S 28.84 W
106.08 S 24.09 W
109.90 S 15_64 W
117.19 S 1.54 E
125.74 S 22.79 E
Global Coordinates Dogleg Vertical
Northings Eastings Rate Section
(~t) (ft) (°/100ft) (ft)
5998595.59 N 681308.46 E 0.00
5998595.59 N 681308.46 E 0.000 0.00
5998594.73 N 681308.33 E 1.000 -0.39
5998592.14 N 681307.94 E 1.000 -1.54
5998587.83 N 681307.28 E 1.000 -3.47
5998581.79 N 681306.37 E 1.000 -6.17
5998574.21 N 681304.21 E 1.500 -10.52
5998565.26 N 681299.83 E 1.500 -17.41
5998554.96 N 681293.22 E 1.500 -26.83
5998544.26 N 681285,16 E 1.500 -37.75
5998540.59 N 681282.23 E 0.000 -41.65
5998531.70 N 681275.13 E 1.500 -51.12
5998522.06 N 681267.43 E 1.500 -61.37
5998514,46 N 681261.36 E 1.500 -69.46
5998508.89 N 681256.92 E 1.500 -75.38
5998505.37 N 681254.11 E 1.500 -79.13
5998503.95 N 681252.97 E 1.500 -80.63
5998503.89 N 681252.93 E 1.500 -80.70
5998503.84 N 681252.89 E 1.500 -80.75
5998503.84 N 681252.89 E 0.000 -80.75
5998503.84 N 681252.89 E 0.000 -80.75
5998503.38 N 681253.95 E 1.500 -79.88
5998501.87 N 681257.41 E 1.500 -77.04
5998499,31 N 681263.27 E 1.500 -72.23
5998495.70 N 681271.52 E 1.500 -65.46
5998491.05 N 681282.15 E 1.500 -56.74
5998488.96 N 681286.95 E 1.500 -52.80
5998485.34 N 681295.49 E 2.500 -45.75
5998478.47 N 681312.84 E 2.500 -31.30
5998470.44 N 681334.30 E 2.500 -13.28
Alaska State Plane Zone 4
Point Mclntyre Pad 2
Comment
Start Dir @ 1.000°/100ft- 400.00fl MD, 400.00ft TVD
Dir Rate Increase @ 1.500°/100ft: 800.00ft MD, 799.68ft TVD
End Dir- 1192.22ft MD, 1189.35ft TVD
Start Dir @ 1.500°/100ft- 1222.22ft MD, 1218.98ft TVD
BASE PERMAFROT
End DIr' 1822.22fl MD, 1816.51ff-FVD
Start Dir @ 1.500°/100ft ' 2205.71ft MD, 2200.00ft TVD
Dir Rate Increase @ 2.500°/100ft ' 2739,04ft MD, 2731.60ft 'I-VD
Continued...
o
25 September, 1998 - 9:23 - I - DrillC~uest
Shared Services Drilling
Point Mclntrye
Measured
Depth
(ft)
Incl. Azim,
3100.00 16.985 110.858
3200.00 19.481 110.378
3300.00 21.977 110.003
3300,92 22.000 110.000
3400.00 24.204 104,910
3500.00 26,572 100,610
3600.00 29.050 96.980
3700.00 31.611 93.882
3800.00 34.236 91.210
3806.80 34.417 91.041
3900,00 36.912 88.877
4000.00 39.628 86.820
4100.00 42.377 84.986
-4158.59 44,000 84.000
4238.66 44.000 84.000
4859.79 44.000 84.000
5000.00 44.000 84.000
5197.87 44.000 84.000
5350.79 44.000 84.000
5560.98 44.000 84.000
5600.00 45.561 84.000
5700.00 49.561 84.000
5800.00 53.561 84.000
5854.42 55.737 84.000
5900.00 57.561 84.000
6000.00 61.561 84.000
6100.00 65.561 64.000
6200.00 69.561 84.000
6210.98 70.000 84.000
6300.00 69.939 83.753
Sub-Sea Vertical
Depth Depth
(ft) (ft)
3034.86 3083.66
3129.83 3178.63
3223.35 3272.15
3224.20 3273.00
3315.34. 3364.14
3405.69 3454.49
3494.13 3542.93
3580.45 3629.25
3664.38 3713.18
3670.00 3718.80
3745.72 3794.52
3824.22 3873.02
3899,68 3948.48
3942.40 3991.20
4000.00 4048.80
4446.80 4495.60
4547.66 4596.46
4690.00 __ 4738.80
~ q,4848.80
~q~sooo.oo
4978.89 5027.69
5046,36 5095.16
5108.52 5157.32
5140.00 5188.80
5165.06 5213.86
5215.71 5264.51
5260.23 5309.03
5298.39 5347.19
5302.19 5350.99
5332.68 5381.48
Sperry-Sun Drilling Services
Proposal Report for P2-08 (R) WP2
Local Coordinates
Northings Eastings
(ft) (ft)
135.53 S 48.09 E
146.54 S 77.37 E
158.75 S 110,59 E
158.86 S 110.91E
170.44S 147.99 E
179.83 S 189.79 E
186.90 S 235.88 E
191.63 S 286.14 E
194.00 S 340.43E
194.07 S 344.Z6 E
194.00 S 398.59 E
191.65 S 460.47E
186.93 S 525.89 E
183.08 S 565.81 E
177,26 S 621.12 E
132.16 S 1050.23 E
121.98 S 1147,09 E
107,61S 1283.80 E
96.51 S 1389.44E
81.25 S 1534.65 E
78.38 S 1561.98E
70.66 S 1635.36 E
62.48 S 1713.24E
57.84 S 1757.38 E
53.86 S 1795.25 E
44.85 S 1880.98 E
35.49 S 1970.01 E
25.83 S 2061.91 E
24.75 S 2072.16 E
15.83 S 2155.32 E
Global Coordinates Dogleg Vertical
Northings Eastings Rate Section
(fi) (fi) (°/100ft) (ft)
5998461.27 N 681359.82 E 2.500
5998450.97N 681389.36 E 2.500
5998439.57 N 681422.87 E 2.500
5998439.46 N 681423.20 E 2.500
5998428.79 N 681460.54 E 3.000
5998420.41 N 681502.56 E 3.000
5998414.46 N 681548.81 E 3,000
5998410.96 N 681599.17 E 3.000
5998409,91 N 681653.49 E 3.000
5998409.93 N 681657.33 E 3.000
5998411.31N 681711.64E 3.000
5998415,17 N 681773.44E 3.000
5998421,47 N 681838.73 E 3.000
5998426.29 N 681878,54E 3.000
5998433.45 N 681933.70 E 0.000
5998488.95 N 682361,59 E 0,000
5998501.48 N 682458.18 E 0.000
5998519.16 N 682594.49 E 0.000
5998532.82 N 682699.83 E 0.000
5998551.60 N 682844.63 E 0.000
5998555.14 N 682871.88 E 4.000
5998564.63 N 682945.06 E 4.000
5998574.70 N 683022.72 E 4.000
5998580.41 N 683066.73 E 4.000
5998585.31 N 683104.49 E 4,000
5998596.39 N 683189,97 E 4.000
5998607.91 N 683278.75 E 4.000
5998619.80 N 683370.39 E 4.000
5998621.12 N 683380.6t E 4.000
5998632.06 N 683463.53 E 0.269
Alaska State Plane Zone 4
Point Mcintyre Pad 2
Comment
8.27
33.30
61.78
62.06
94.42
Dir Rate Increase @ 3,000°/100ft- 3300.92ft MD, 3273.00ft TVD
131.93
174.20
221.13
272.59
276.25 SV4 [Estimate]
328.43
388.50
452.63
492.03 End Dir: 4158.59ff MD, 3991.20ft TVD
546.76 · Top Stuck Pipe Zone
971,36
1067.21
1202.47
1307.01
1450.69
~477.74
1550.35
1627.41
1671.09
1708.55
Sari @ 44.000° Inclination on 84.000° Azimuth
T-3 (SV-1)
5/8" Casin,q
ottom Stucl( Pipe Zone
Start Dir @ 4,000°/100ff- 5560.98ft MD, 5000.00fl TVD
K-15
1793.38
1881.48
1972.41
1982.56
2064.89
BHA Tendency @ 0.269"/100ff · 6210.98ft MD, 5350.99ft TVD
Continued...
25 September, 1998 - 9:23 - 2 - Dri#Cluest
Shared Services Drilling
Point Mcintrye
Measured
Depth
Incl. Azim.
Sub-Sea
Depth
(ft)
Sperry-Sun Drilling Services
Vertical Local Coordinates
Depth Northings Eastings
(ft) (ft) (ft)
6400.00 69.870 83-476 5367.03 5415.83
6500.00 69.802 83.198 5401.51 5450.31
6600.00 69,734 82.920 5436.09 5484.89
6700.00 69,667 82,642 5470.78 5519.58
6800.00 69.600 82.363 5505.58 5554.38
6900.00 69.534 82.084 5540.49 5589.29
7000.00 69.468 81.805 5575.51 5624.31
7100.00 69.403 81.526 5610.64 5659.44
7200,00 69,338 81.247 5645.87 5694.67
7300.00 69.273 80,967 5681,21 5730.01
7400.00 69.209 80.687 5716.65 5765.45
7500.00 69.146 80.407 5752.20 5801.00
7600.00 69.083 80.126 5787.85 5836,65
7700.00 69,020 79.846 5823.60 5872.40
7800.00 68.958 79.565 5859.46 5908.26
7900,00 68,896 79.284 5895.41 5944.21
8000.00 68,835 79.002 5931,47 5980.27
8100.00 68.774 78,721 5967.63 6016,43
8200.00 68,713 78,439 6003.88 6052.68
8300.00 68,653 78.157 6040.23 6089.03
8400.00 68,594 77,875 6076.68 6125.48
8500.00 68.535 77.592 6113.23 6162.03
8600.00 68,476 77,309 6149.87 6198.67
8700.00 68,418 77.027 6186.60 6235.40
8800,00 68.361 76,743 6223.43 6272.23
8900.00 68.304 76.460 6260.36 6309.16
9000.00 68.247 76.176 6297.37 6346.17
9100.00 68.191 75.892 6334.48 6383.28
9200.00 68.136 75.608 6371.67 6420.47
9300.00 68.080 75.324 6408.96 6457.76
25 September, 1998 - 9:23
Proposal Report for P2-08 (R) WP2
5.39 S 2248.64 E
5.50 N 2341.88 E
16.84 N 2435.02 E
28.63 N 2528.07 E
40.86 N 2621.02 E
53,54 N 2713.86 E
66.67 N 2806.61 E
80,24 N 2899.25 E
94.26 N 2991.78 E
108.72 N 3084.20 E
123.62 N 3176.51 E
138.98 N 3268.71 E
154.77 N 3360.80 E
171.01 N 3452.76 E
187.69 N 3544.61 E
204.82 N 3636.34 E
222.39 N 3727.94 E
240.40 N 3819.42 E
258.85 N 3910,77 E
277.75 N 4002.00 E
297.08 N 4093.09 E
316.86 N 4184.04 E
337.07 N 4274.87 E
357.73 N 4365.55 E
378.83 N 4456.10 E
400.36 N 4546.50 E
422.33 N 4636.76 E
444.75 N 4726.88 E
467.59 N 4816.85 E
490.88 N 4906.67 E
Global Coordinates Dogleg Vertical
Northings Eastings Rate Section
(fi) (fi) (°/10off) (ft)
5998644.76 N 683556.57 E 0,269 2157,41
5998657.92 N 683649.52 E 0,269 2249,98
5998671.51 N 683742.36 E 0,269 2342.57
5998685.55 N 683835.09 E 0,269 2435,20
5998700,04 N 683927.71 E 0.269 2527.86
5998714.96 N 684020.23 E 0.269 2620.55
5998730.34 N 684112.62 E 0,269 2713,26
5998746.15 N 684204.91 E 0.269 2806.00
5998762,41 N 684297.07 E 0,269 2898.76
5998779.11 N 684389.12 E 0,269 2991.54
5998796.25 N 684481,04 E 0.269 3084.34
5998813.84 N 684572.84 E 0.269 3177.15
5998831.86 N 684664.51 E 0,269 3269.98
5998850.33 N 684756,06 E 0.269 3362.82
5998869:23 N 684847.47 E 0.269 3455.67
5998888.58 N 684938.76 E 0.269 3548.52
5998908.37 N 685029.91 E 0.269 3641.39
5998928.59 N 685120.92 E 0.269 3734.25
5998949.25 N 685211.80 E 0.269 3827.12
5998970.36 N 685302.54 E 0.269 3919.98
5998991.90 N 685393.13 E 0.269 4012.85
5999013.87 N 685483.58 E 0.269 4105.71
5999036.29 N 685573.89 E 0.269 4198.56
5999059.14 N 685664.05 E 0.269 4291.40
5999082.43 N 685754.05 E 0.269 4384.24
5999106.15 N 685843.91 E 0.269 4477.06
5999130.30 N 685933.61 E 0.269 4569.86
5999154.90 N 686023.16 E 0.269 4662.65
5999179.92 N 686112.54 E 0.269 4755.42
5999205.38 N 686201.77 E 0.269 4848.16
Comment
Alaska State Plane Zone 4
Point Mclntyre Pad 2
Cont/nued...
I
I
- 3- Dr#/Quest
Shared Services Drilling
Point Mclntrye
Measured
'Depth
(ft)
Incl. Azim.
Sub-Sea
Depth
dr)
Sperry-Sun Drilling Services
Vertical Local Coordinates
Depth Northings Eastings
Ct) (ft) (ft)
9400.00 68.026 75.040 6446.33 6495.13
9500.00 67.972 74.755 6483.80 6532.60
9600.00 67.918 74.470 6521.35 6570.15
9700.00 67.865 74.185 6558.98 6607.78
9800.00 67.812 73.899 6596.70 6645.50
9900.00 67.760 73.614 6634.51 6683.31
10000.00 67.708 73.328 6672.40 6721.20
10100.00 67.657 73.042 6710.37 6759.17
10200.00 67.607 72.756 6748.43 6797.23
10300.00 67.556 72.469 6786.57 6835.37
10400.00 67.507 72.183 6824.79 6873.59
10500.00 67.458 71.896 6863.08 6911.88
10600.00 67.409 71.609 6901.46 6950.26
t0700.00 67,361 71.321 6939.91 6988.71
' 10800.00 67.313 71.034 6978.44 7027.24
10900.00 67,266 70.746 7017.05 7065.85
10920.57 67.256 70,687 7025.00 7073.80
11000,00 67.220 70.459 7055,73 7104,53
11100,00 67,173 70.170 7094.49 7143.29
11121.41 67.164 70.109 7102.80 7151.60
11200.00 67,128 69.882 7133.32 7182.12
11300.00 67.083 69,594 7172.23 7221,03
11400.00 67.038 69,305 7211.20 7260,00
11500.00 66.994 69.016 7250.25 7299.05
11600,00 66.951 68.727 7289.37 7338.17
11700.00 66.908 68.438 7328.55 7377.35
11800.00 66.866 68.149 7367.81 7416.61
11900.00 66.824 67.859 7407.13 7455.93
12000.00 66.782 67.570 7446.52 7495.32
12100.00 66.742 67.280 7485.97 7534.77
Proposal Report for P2-08 (R) WP2
25 September, 1998 - 9:23
514.60 N 4996.34 E
538.76 N 5085.85 E
563.35 N 5175.21E
588.38 N 5264.41E
613.84 N 5353.46 E
639.74 N 5442.34E
666.07 N 5531.06 E
692.83 N 5619.61 E
720.02 N 5708.00 E
747.65 N 5796.22 E
775.70 N 5884.26 E
804.19 N 5972.14 E
833.10 N 6059.84 E
862.45 N 6147.36 E
892.22 N 6234.70 E
922.42 N 6321.87 E
928.68 N 6339.77 E
953.04 N 6408.85 E
984.10 N 6495.64 E
990.80 N 6514.21E
1015.58 N 6582.25 E
1047.48 N 6668.68E
1079.81 N 6754.91 E
1112.56 N 6840.95 E
1145.73 N 6926.79 E
1179.32 N 7012.44E
1213.34 N 7097.89 E
1247.78 N 7183.14 E
1282.63 N 7268.19 E
1317.91 N 7353.04 E
Global Coordinates Dogleg Vertical
Northings Eastings Rate Section
(fi) (fi) (°/lOOff) (fi)
5999231.27 N
5999257.59 N
5999284.35 N
5999311.53 N
5999339.15 N
5999367.19 N
5999395.66 N
5999424.57 N
5999453.90 N
5999483.65 N
5999513.84
5999544.45
5999575.48
5999606.94
5999638.82
5999671.13
5999677.82
5999703.86
5999737.01
5999744.16
5999770.58
5999804.57
5999838.98
5999873.80
5999909.05
5999944.71
5999980.79
6000017.29
6000054.20
6000091.52
686290.84E 0.269 4940.89
686379.74 E 0.269 5033.59
686468.48E 0,269 5126.26
686557.05 E 0.269 5218.90
686645.45E 0.269 5311.51
686733.67 E 0.269 5404.09
686821.73 E 0.269 5496.63
686909.61 E 0.269 5589.14
686997.31 E 0,269 5681.60
687084.83E 0.269 5774.03
687172.17 E 0.269 5866.41
687259.33 E 0.269 5958.74
687346.30 E 0.269 6051.03
687433.08 E 0,269 6143.26
687519.68 E 0.269 6235.45
687606.08 E 0.269 6327.58
687623.83 E 0.269 6346.52
687692.30 E 0,269 6419.66
687778.31 E 0,269 6511.67
687796.71E 0,269 6531.37
687864.13 E 0.269 6603,63
687949.76 E 0.269 6695,52
688035.18 E 0.269 6787.36
688120.40 E 0.269 6879.12
688205.41 E 0.269 6970.82
688290.22 E 0.269 7062.44
688374.82 E 0.269 7154.00
688459.21 E 0.269 7245.48
688543.39 E 0.269 7336.88
688627.36 E 0.269 7428.21
Comment
WEST SAK (SEISMIC TOP)
Top Colville [Estimate]
-4-
Alaska State Plane Zone 4
Point Mclntyre Pad 2
Continued...
DrillQuest
O
Shared Services Drilling
Point Mclntrye
Measured
Depth
(ft)
Incl. Azim.
Sperry-Sun Drilling Services
Sub-Sea Vertical Local Coordinates
Depth Depth Northings Eastings
(ft) (ft) (ft) (ft)
12200.00 66.701 66.990 7525.49 7574.29
12300.00 66.661 66.699 7565.08 7613.88
12400.00 66.622 66.409 7604.73 7653.53
12500.00 66.584 66.118 7644.44 7693.24
12600.00 66.545 65.828 7684.21 7733.01
12700.00 66.508 65.537 7724.04 7772.84
12800.00 66.471 65.246 7763.93 7812.73
12900.00 66.434 64.954 7803.88 7852.68
13000.00 66.398 64.663 7843.89 7892.69
13100.00 66.363 64.371 7883.96 7932.76
13200.00 66.328 64.080 7924.08 7972.88
13300.00 66.294 63.788 7964.26 8013.06
13400.00 66.260 63.496 8004.49 8053.29
'13500.00 66.227 63,203 8044,78 8093.58
' '13600.00 66.194 62.911 8085.12 8133.92
13700.00 66.162 62.619 8125.51 8174.31
13800,00 66.130 62.326 8165.95 8214.75
13900.00 66.099 62.033 8206.44 8255.24
14000.00 66.069 61.740 8246.98 8295.78
14100.00 66.039 61.447 8287.57 8336.37
14200.00 66.009 61.154 8328.20 8377.00
14300.00 65.980 60.861 8368.88 8417,68
14400,00 65.952 60.567 8409.61 6458.41
14500.00 65.924 60.274 8450.38 8499.18
14600.00 65,897 59.980 8491.20 8540,00
14700.00 65.871 59.686 8532_06 8580.86
14800.00 65.845 59.392 8572.96 8621.76
14900,00 65,819 59.098 8613.90 8662.70
15000.00 65.794 58.804 8654.88 8703.68
15100.00 65.770 58.510 8695.90 8744.70
25 September, 1998 ~ 9:23
Proposal Report for P2-08 (R) WP2
1353.60 N 7437.68 E
1389.71 N 7522.11 E
1426.24 N 7606.34 E
1463.18 N 7690.35 E
1500.54 N 7774.15 E
1538.31N 7857.74 E
1576.50 N 7941.11 E
1615.10 N 8024.26 E
. 1654.10 N 8107.19 E
1693.52 N 8189.90 E
1733.35 N 8272.38 E
1773.59 N 8354.64 E
1814.24 N 8436.68 E
1855.29 N 8518.48 E
1896.75 N 8600.05 E
1938.62 N 8681.39 E
1980.89 N 8762.49 E
2023.56 N 8843.36 E
2066.64 N 8923.99 E
2110.11N 9004.38 E
2153.99 N 9084.52 E
2198.27 N 9164.42 E
2242.95 N 9244.08 E
2288.02 N 9323.49 E
2333.49 N 9402.65 E
2379.36 N 9481.56 E
2425.62 N 9560.22 E
2472.27 N 9638.63 E
2519.32 N 9716.77 E
2566.76 N 9794.66 E
Global Coordinates Dogleg Vertical
Northings Eastings Rate Section
(ft) (ft) (°/lOOft) (ft)
6000129.26 N 688711.11 E 0.269 7519.46
6000167.41 N 688794.64 E 0,269 7610.62
6000205.97N 688877.95 E 0.269 7701.70
6000244.94 N 688961.05 E 0.269 7792.69
6000284-.32 N 689043.92 E 0.269 7883.60
6000324.11 N 689126.56 E 0.269 7974.41
6000364.30 N 689208,98 E 0.269 8065.13
6000404.91 N 689291.17 E 0.269 8155.76
6000445,92 N 689373.13 E 0.269 8246,29
6000487.33N 689454.86 E 0,269 8336.72
6000529.15 N 689536.35 E 0.269 8427_06
6000571.38 N 689617.61 E 0.269 8517.29
6000614.00 N 689698.63 E 0.269 8607.41
6000657.03 N 689779.41 E 0.269 8697.43
6000700.45N 689859.96 E 0.269 8787.34
6000744.28 N 689940.25 E 0.269 8877.15
6000788.51 N 690020.31 E 0.269 8966.83
6000833.13 N 690100.12 E 0.269 9056.41
6000878.15 N 690179.68 E 0.269 9145.87
6000923.56 N 690258.99 E 0.269 9235.21
6000969.37 N 690338.04 E 0.269 9324.43
6001015.57 N 690416.85 E 0.269 9413.52
6001062.17 N 690495.40 E 0.269 9502.50
6001109.16 N 690573.69 E 0.269 9591.34
6001156.54 N 690651.73 E 0.269 9680.06
6001204.30 N 690729.50 E 0.269 9768.65
6001252.46 N 690807.01 E 0.269 9857.11
6001301.00 N 690884.26 E 0.269 9945.43
6001349.93 N 690961.25 E 0.269 10033.62
6001399_24 N 691037.96 E 0.269 10121.67
Comment
Alaska State Plane Zone 4
Point Mclntyre Pad 2
Continued...
DrfllQuest
I
O
Sperry-Sun Drilling Services
Proposal Report for P2-08 (R) WP2
Shared Services Drilling
Point Mclntrye
Measured Sub-Sea Vertical Local Coordinates
Depth Incl. Azim. Depth Depth Northings Eastings
(ft) (ft) Ct) (tt) (ft)
Global Coordinates Dogleg Vertical
Northings Eastings Rate Section
(ft) (ft) (°/100ft) (ft)
15200.00 65.746 58.215 8736.96 8785.76 2614.58 N 9872.29 E
15300.00 65.723 57.921 8778.06 8826.86 2662.80 N 9949.66 E
15400.00 65.701 57.626 8819.19 8867.99 2711.41 N 10026.77 E
15500.00 65.678 57.331 8860.36 8909.16 2760.40 N 10103.61 E
15600.00 65.657 57.037 8901.56 8950.36 2809.78 N 10180.19 E
15700.00 65.636 56.742 8942.80 8991.60 2859.55 N 10256.50 E
15717.46 65.632 56.690 8950.00 8998.80 2868.28 N 10269.79 E
15753.81 65.625 56.583 8965.00 9013.80 2886.49 N 10297.45 E
15790.15 65.618 56.476 8980.00 9028.80 2904.74 N 10325.06 E
15800.00 65.611 56.448 8984.07 9032.87 2909.70 N 10332.54 E
15887.40 65.551 56.198 9020.20 9069.00 2953.83 N 10398.77 E
15900.00 65.542 56.162 9025.41 9074.21 2960.21 N 10408.29 E
_16000.00 65.474 55.876 9066.87 9115.67 3011.07 N 10483.75 E
16005.13 65.470 55.862 9069.00 9117.80 3013.69 N 10487.61 E
16100.00 65.405 55.590 9108.44 9157.24 3062.28 N 10558.92 E
16145.13 65.374 55.461 9127.23 9176.03 3085.51 N 10592.74 E
6001448.94 N 691114.41 E 0.269 10209.58
6001499.02 N 691190.59 E 0.269 10297.34
6001549.49 N 691266.49 E 0.269 10384.97
6001600.33 N 691342.12 E 0.269 10472.44
6001651.55 N 691417.48 E 0.269 10559.78
6001703.16 N 691492.56 E 0.269 10646.96
600171221 N 691505.64 E 0.269 10662.16
6001731.08 N 691532.84 E 0.269 10693.81
6001750.00 N 691560.00 E 0.269 10725.42
6001755.14 N 691567.35 E 0.269 10733.99
6001800.86 N 691632.49 E 0.269 10809.91
6001807.47 N 691641.86 E 0.269 10820.84
6001860.15 N 691716.07 E 0.269 10907.52
6001862.86 N 691719.86 E 0.269 10911.96
6001913.17 N 691789.97 E 0.269 10994.01
6001937.21 N 691823.22 E 0.269 11032.98
All data is in feet unless otherwise stated. Directions and coordinates are relative to True North.
Verticai depths are relative to Well Reference. Northings and Eastings are relative to Well Reference.
The Dogleg Severity is in Degrees per 100ft.
Vertical Section is from Well Reference and calculated along an Azimuth of 73.760° (True).
Based upon Minimum Curvature type calculations, at a Measured Depth of 16145.13ft.,
The Bottom Hole Displacement is 1 1032.98ft., in the Direction of 73.760° (True).
Comment
HRZ
KALUBIK
TKUP
Target: P2-R, 200.00 Radius., Geological
WOC
Total Depth ' 16145.13ft MD, 9176.03ft TVD
7" Casing
Alaska State Plane Zone 4
Point Mclntyre Pad 2
Continued...
DrillOuest
25 September, 1998 - 9:23
--' STATE OF ALASKA -"
ALASKA OIL AND GAS CONSERVATION COMMISSION
PERMIT TO DRILL
20 AAC 25.005 REVISED 10/01/98
la. Typeofwork I~Drill [--IRedrill Ilb. Typeofwell ElExploratory r-lStratigraphicTest I~ Development Oil
[] Re-Entry [] Deepenl [] Service [] Development Gas [] Single Zone [] Multiple Zone
2. Name of Operator 5. Datum Elevation (DF or KB) 10. Field and Pool
ARCO Alaska Inc. Plan RTE = 49.0' Point Mclntyre
3. Address 6. Property Designation
P.O. Box 196612, Anchorage, Alaska 99519-6612 ADL365548
4. Location of well at surface 7. Unit or Property Name 11. Type Bond (See 20 AAC 25.025)
18' NSL, 1073' WEL, SEC. 11, T12N, R14E, UM Point Mclntyre
At top of productive interval 8. Well Number Number U-630610
2915' NSL, 842' WEL, SEC. 7, T12N, R15E, UM P2-08
At total depth .9. Approximate spud date Amount $200,000.00
3096' NSL, 1110' WEL, SEC. 7, T12N, R15E, UM 10/20/98
12. Distance to nearest property line113. Distance to nearest well 14. Number of acres in property 15. Proposed depth (MD and ]-VD)
ADL388469, 1110'I P2-09, 9.39' at 699' MD 3601 16145' MD / 9176' TVD
16. To be completed for deviated wells 17. Anticipated pressure (see 20 AAC 25.035 (e) (2)}
Kick Off Depth 2206' MD Maximum Hole Angle 70° Maximum surface 3467 psig, At total depth ('I-VD) 8800' / 4347-psig
18. Casing Program Specifications Setting Depth
Size Top Bottom Quantity of Cement
Hole Casing Weight Grade Coupling Length MD TVD MD TVD (include stage data) -
30" 20" 133# H-40 BTC 80' 36' 36' 116' 129'116' Driven
12-1/4" 9-5/8" 40# L-80 BTC-Mod 5316' 35' 35' 5351' 4949' 1544 sx Coldset Ill, 456 Class "G'
8-3/4" 7" 26# L-80 BTCM 15456' 34' 34' 15490' 8905' 271 sx Class 'G'
8-3/4" 7" 29# 13CR BTCM 655' 15490' 8905' 16145' 9176'
19. To be completed for Redrill, Re-entry, and Deepen Operations.
Present well condition summary
Total depth: measured feet Plugs (measured)
true vertical feet
Effective depth: measured feet Junk (measured)
true vertical feet
Casing Length Size Cemented MD TVD
Structural
Conductor
Surface
Intermediate
Production REQUEST FOR DIVERTER WAIVER
Liner
0(;! O I 1998
Perforation depth: measured ggPLi C kT E A]I~S~a 0,, & 8a$ (,,,¢,,,~,
true vertical
.20. Attachments [] Filing Fee [] Property Plat [] BOP Sketch [] Diverter Sketch [] Drilling Program
[] Drilling Fluid Program []Time vs Depth Plot [] Refraction Analysis [] Seabed Report [] 20 AAC 25.050 Requirements
Contact Engineer Name/Number: Justin Balkenbush, 564-5238 ~'d~?~ Prepared By Name/Number: Carol Withey, 564-4114
certify that the f regoing is true d orrect to the best of my knowledge
21. I hereby ~e~.~. ~,~.?n~
Signed Lowell crane ',/' Titie Drilling Engineering Supervisor Date / O -
-..
/ Commission Use Only
L,/
Permit Number I APl Number I Approval Date,~o See cover letter
98-123I 50-029-22896I ~ "~-- ~ ~'' for other requirements
Conditions of Approval: Samples Required [] Yes ,~ No Mud Log Required []Yes
Hydrogen Sulfide Measures J~Yes ~_;No Directional Survey Required J~Yes [] No
Required Working Pressure for DOPE []2K; []3K; []4K; [~SK; [] 10K; [] 15K
Other: Origii,8.~ e;'"n"'rl ~Y
'"'* ' o,~j,.~, by order of Date//"/)''
Approved By 0avid W. Johnston Commissioner the commission
I Well Name:
I Type of Well (producer or injector):
I P2-08 ]
I Producer
Surface Location:
Target Location:
Bottom Hole Location:
18' FSL, 1073' FWL, T 12N, R 14E, S 11
2915' FSL, 842' FWL, T 12N, R 15E, S 7
3096' FSL, 1110' FWL, T 12N, R 15E, S 7
AFE Number: 12C0130 I
IEstimated Start 10/20/98
Date:
I MD: 116145'
I Rig: [NABORS 33E
Days to complete
24 days
Iq'VD: 19176' I ]RTE: 149.0 I
I Well Design (conventional, slimhole, etc.): I Ultra-Slimhole 7" Longstring, 3 1/2" 13 Cr
tbg
--
Formation Markers:
Formation Tops MD TVD
Base of 1789' 1783'
Permafrost
SV4 3807' 3719'
SVl (-I-3) 5197' 4739'
9 5/8" Casing 5351' 4849' 9-5/8" csg shoe below SV1 & above
Point K-15
K15 (Ugnu) 5854' 5189'
West Sak 10921' 7074' 9.5 ppg minimum mud weight
required.
HRZ/K-10 15717' 8999' K-10/HRZ same depth. 9.6-9.9 EMW
to this depth. 3% 10.5 ppg KCI GEM
System at 500' ABOVE K-10. 10.5 for
the 70 degrees in the HRZ.
Kalubik 15754' 9014'
Kuparuk 15790' 9029'
OWC 16005' 9118'
TD 16145' 9176' 140' Md Below the OWC.
Casing/Tubinq Program:
Hol(; Cs~/Tbg Wt/Ft Grade Conn Length Top Btm
Size O.D. MD/TVD MD/TVD
30" 20" 133# H40 BTC 80' 36'/36' 116'/116'
12 1/4" 9 5/8" 40# L-80 BTC-Mod 5316' 35'/35' 5351'/4949'
8 3/4" 7" 26# L-80 BTCM 15456' 34'/34' 15490'/8905'
8 3/4" 7" 29# 13 Cr BTCM 655' 15490'/8905' 16145'/9176'
Tubing 3 1/2" 12.6# 13 Cr NSTC 15657' 33'/33' 15690'/8988'
Mud Program:
Surface Mud Properties: Spud 112 1/4" hole section
8.7-9.5 | 100-300 30-70 20-60 40-80
pH
Fluid Loss
9-10 15 - 25cc
Production Mud Properties: LSND 18 3/4" hole section
Density(ppg)rFunnelVislYieldPoint 10secgel I10mingel
8.8-9.9 40-55 18-22 5-15 < 30
pH Fluid Loss
9.0-9.5 4-6cc
Production Mud Properties: 3% KCL 18-3/4" hole section, GEM
Density (ppg) Plastic Vis Yield Point I 10 sec gel 10 min gel
10.5 8-15 15-25I 8-15 < 30
pH Fluid Loss
9.0-9.5 <5cc
Cement Data:
Casing First Stage: Second Stage: Comments
Sxs/VVt/Yield Sxs/W~ield
9-5/8" surface Coldset II1: 979/12.2/1.92 Two stage job: -
casing 565/12.2/1.92 (assumes 200% First stage Coldset III lead from
to 5351' excess in 2000'-4308' @ 50% excess
ES cementer Class G: permafrost) followed by Class G tail from
@ at 2000' 456/15.8/1.15 shoe to 4308' (750' TVD) @ 50%
MD. excess + 80' shoe.
Second stage Coldset III
circulated to surface.
Casing/Liner Lead:Sxs/Wt/Yield Tail:Sxs/Wt/Yield Comments
7" none 271/15.8/1.19 Class "G". Volume based on
cement to 1000' above the
Kuparuk with 50% excess + 80'
shoe.
Logging Program:
I Open Hole Logs:
ICased Hole Logs:
12 1/4" MWD/multi-shots as needed for directional survey.
MWD/LWD GR/RES to 500' above K-10.
MWD/LWD GR/RES/DEN/NEU (Triple Combo) to TD. Gyro if
requested.
GR/CBT-CET (contingent on cmt job mechanics).
Well Control:
Well control equipment consisting of 5000 psi W.P. pipe rams, blind rams, and annular preventer
will be installed and is capable of handling maximum potential surface pressures.
It is requested that the diverter be waived for this well. The diverter would point at Manifold
buildings or other wells with the design of N-33E. There has never been any surface gas
reported in any of the PM-2 drilling programs. All 1998 wells have been drilled with no issues.
BOPE and drilling fluid system schematics are on file with AOGCC.
Directional:
KOP: 2206' MD
Maximum Hole Angle:
Close Approach Wells:
70 degrees @ 6,210'
P2-07 11.13' Allowable Deviation at 602' MD (SI thru SSSV)
P2-09 9.39' Allowable Deviation at 699'MD (SI thru SSSV)
P2-11 Must not bring on line until Surface Csg set on P2-08
P2-30 Must be Risk based (close approach at - 7,200')
P2-32 Must be Risk based and SI (close approach at - 9,500')
P2-40 Must not bring on line until Surface Csg set on P2-08
Drilling and Completion Scope
]. Move rig to P2-08. NU riser and flowlines.
2,. Drill 12-1/4" surface hole to 5351' MD.
3. Run and cement 9 5/8" casing. Cement to surface.
4. RIH with 8-3/4" bit, MWD DIR/LWD GR/Res to float collar.
.5. PT casing to 3000 psi for 30 min. Record on chart.
6. Drill out 20', perform LOT. Record on chart. -
?. Drill 8-3/4" production hole to 500' MD above the K-10. Trip and swap to LWD triple combo'
BHA. Swap to 10.5 PPG 3% KCl/GEM system on this trip.
8. Drill 8-3/4" production hole to 16145' MD. PDC bits will be used to drill this section.
P. Perform a Wiper Trip.
]0. Circulate and Condition Mud, POOH to Run 7" Longstring.
! ]. Run/cement 7" long string.
:t2. Circulate well to kill weight filtered brine. Perforate via DPC guns.
]3. Kill well, Run 3 1/2" 13Cr tubing with 7"x4 Y2" packer w/XO's, 3 1/2" SSSV, and 3 1/2"x11/2"
GLMs.
14. Secure well, RDMO.
Drilling Hazards/Contingencies
· The original reservoir pressure is 4377 psi at 8800' ss. The expected reservoir pressure is
4347 psi at 8800' ss. Abnormally pressured formations are not expected in this well. The
10.5 ppg mud will overbalance the anticipated pressure by 458 psi.
· Tight hole has been experienced in the lower Sagavanirktok, below the surface casing shoe
which were set into the SV4 sand. This has caused stuck pipe incidents and bit/BHA bailing
Gumbo problems.
· Coal stringers/SV Sands in the lower Ugnu have caused stuck pipe.
· No major instances of lost circulation problems have occurred on Pt Mac 2 wells.
Disposal
· Cuttings Handling: Cuttings should be hauled to the ball mill at CC-2A.
Fluid Handling: Haul all drilling and completion fluids and other Class II wastes to CC-2A for
injection. Haul all Class I wastes to Pad 3 for disposal. In addition, haul all cuttings from
drilling operations to CC-2A for disposal, except any metal cuttings which will be sent to the
North Slope Borough.
SK 9/3O/98
TREE: 4-1/16"-5M chrome
WELLHEAD: 11" X 11" - 5M FMC
Gen 5 Type
4000' (top glm)
9-5/8", 40#/ft, L-80 J 5351' I
BTC
P2-08
~-~T-GL = 36.2'
GL-SL = 12.8'
3-1/2" TRDP 4 I 2000'j
KOP: 2206'
MAX ANGLE: 70° @ 6211' MD
3 1/2" 12.6# 13 Cr NSCT
1TUBING
CAPACITY: 0.00914
BBL/FT
PERFORATION SUMMARY:
Ref LoC:
Size J Interval SPF Open/Sqzd
tbd
7", 26 & 29 #/ft, J
L-80 Mod BTC / 13CR
NSC; [ ~
GAS LIFT MANDRELS
(Camco 3-1/2x1-1/2"/
No_
1
2
3
4
5
6
7
MD(BKB)
tbd
II
II
II
II
II
TVDss
40' MD above
packer
OF CHROME 7" = 15490 '
7" shoe at I 16145' I
7" Packer,9Cr
3-1/2" 'X' Nipple
3-1/2" 'XN' Nipple
3-1/2" WLEG
15660'
15670'
15680'
15690'
7"
CHROME
MARKER JOINT (20') ABOVE
KUPARUK BUT BELOW TT.
k
DATE
REV. BY
9/29/98 SK PLANNED
COMPLETION
COMMENTS
Point Mclntyre
WELL: P2-08
AP! NO' 50-029-
Shared Services Drilling
~q, co gu ~u~ uc,oo rri br~KK¥-bU~ flbfl~Kfl
FAX NO, 1g~75635754 P, 02
~a~l'4~J'~LJ~' BP EXPLORATION (ALASKA) INC.D rill Q u e s t
o"'~'~.li~'.a.--_.=-~.~'~"'' Well: P2-08 (n) Wp2 -
~ ,
SUR ACE LOCATION PLOT DATE: 09/0~98
0 ~ Horlzon~l Coardlnate~
~ ~.~ [I WeI/(CBE)
'[/Oir Ra~o Increase e 1.5000/100ft: 800.OOf MD, Coordinate Sy.~= ~ ~7~ka ~t,l, Planes.
....
J ,.
'--End DIr: 1822.2211 MD, 1816.5111TVD I _
.............................................................................................. [~JS0,~783.80
~0~ Dir 0 1 500°/10011 ' 2205.711l MD, 2200.~ I TVO 8230.~ N, 4534.35
,~5~Rate Increase ~ 2.5000/100[t: 2739.~fl MD, 2731.6~t WD
( FO~ PERMI~ING ONL~
~ 3°O0'~i~ Rate Increase ~ 3.000'/100ft: 3300.92fl MD, 3273.00~t TVD
~200 -- ~co.oo
............ ~b~d g~t ~'4 l~mSS~t'~D; ~.~Cn~O ................................................
........ ~. . . .... Top ~m¢~ ~1~
bUU.gg ......
~'- Sail 0 ~.000' Inclination on 8~.000~ Azimuth
9 5/8" Casing
°°°'°°5350.79 ~.~
...................... ~.o~ ...............................
....................... ~ ............................. ~.~
~0.00
~0.00
0.00 ~4oo - ~o.oo
~ ~~.oo
10500.00
I I I I
0 ~00 3200 ~O0
8¢ale; linch = t800~ ~o¢tion ~imuthJ ~3,780' (True No~h)
Ve~ical Section
~0~0
~O.OO
0.00
00,O0 :::::::::::::::::::::::::~~ .
7200 - ::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::
00.00
~o~oo
oo.oo ~ ~oo,oo
'- _ ~ 7" Casing
~800~ ~~145 .13It MD ,9176 .03[1 TVD
~ ; .......................................................................................... ~.~s g~~,,
u ~ ........................................................................................... Pb3~F" 'C~F~[k ......
~ - ~ ~ ~ 9021,80902~,~0
~oo 8400 8000 ~8oo 684.91
Scale: linch = 1600ft Section ~imuth: 73.760' (True No~h)
-.- ~_~_: -_~:~__ . .......
Shared Services Drilling
Point Mclntrye
Measured
Depth
(ft)
Incl. Azim.
Sub-Sea
Depth
(ft)
Sperry-Sun Drilling Services
Vertical Local Coordinates
Depth Northings Eastings
(fi) (ft) (ft)
0.00 0.000 0.000 -48.80 0.00
400.00 0.000 0.000 351.20 400.00
500.00 1.000 190.000 451.19 499.99
600.00 2.000 190.000 551.16 599.96
700.00 3.000 190.000 651.06 699.86
800.00 4.000 190.000 750.88 799.68
900.00 5.099 202.987 850.56 899.36
1000.00 6.364 211.117 950.06 998.86
1100.00 7.713 216.491 1049.31 1098.11
1192.22 9.000 220.000 1140.55 1189.35
1222.22 9.000 220.000 1170.18 1218.98
1300.00 7.833 220.000 1247.12 1295.92
1400.00 6.333 220.000 1346.35 1395.15
- 1500.O0 4.833 220.000 1445.87 1494.67
1600.00 3.333 220.000 1545.62 1594.42
1700.00 1.833 220.000 1645.51 1694.31
-1789.51 0.491 220.000 1735.00 1783.80
1800.00 0.333 220.000 1745.49 1794.29
1822.22 0.000 0.000 1767.71 1816.51
1882.22 0.000 0.000 1827.71 1876.51
2205.71 0.000 0.000 2151.20 2200.00
2300.00 1.414 115.000 2245.48 2294.28
2400.00 2.914 115.000 2345.41 2394.21
2500.00 4.414 115.000 2445.20 2494.00
2600.00 5.914 115.000 2544.79 2593.59
2700.00 7.414 115.000 2644.11 2692.91
2739.04 8.000 115.000 2682.80 2731.60
2800.00 9.512 113.760 2743.05 2791.85
2900.00 12.000 112.398 2841.28 2890.08
3000.00 14.491 111.498 2938.62 2987.42
Proposal Report for P2-08 (R) WP2
0.00 N 0.00 E
0.00 N 0.00 E
0.86 S 0.15 W
3.44 S · 0.61 W
7.73 S 1.36 W
13.74 S 2.42 W
21.27 S 4.76 W
30.11 S 9.37 W
40.25 S 16.22 W
50.75 S 24.54 W
54.35 S 27.55 W
63.07 S 34.87 W
72.51 S 42.80 W
79.97 S 49.05 W
85.42 S 53.63 W
88.87 S 56.53 W
90.26 S 57.69 W
90.32 S 57.74 W
90.37 S 57.78 W
90.37 S 57.78 W
90.37 S 57.78 W
90.86 S 56.73 W
92.46 S 53.31 W
95.16 S 47.51 W
98.96 S 39.36 W
103.87 S 28.84 W
106.08 $ 24.09 W
109.90 S 15.64 W
117.19 S 1.54 E
125.74 S 22.79 E
Global Coordinates Dogleg Vertical
Northings Eastings Rate Section
(ft) (ft) (°/100ft) (ft)
5998595.59 N 681308.46 E 0.00
5998595.59 N 681308.46 E 0.000 0.00
5998594.73 N 681308.33 E 1.000 -0.39
5998592.14 N 681307.94 E 1.000 -1.54
5998587.83 N 681307.28 E 1.000 -3.47
5998581.79 N 681306.37 E 1.000 -6.17
5998574.21 N 681304.21 E 1.500 -10.52
5998565.26 N 681299.83 E 1.500 -17.41
5998554.96 N 681293.22 E 1.500 -26.83
5998544.26 N 681285.16 E 1.500 -37,75
5998540.59 N 681282.23 E 0.000 -41.65
5998531.70 N 681275.13 E 1.500 -51.12
5998522.06 N 681267.43 E 1.500 -61.37
5998514.46 N 681261.36 E 1.500 -69.46
5998508.89 N 681256.92 E 1,500 -75.38
5998505,37 N 681254.11 E 1.500 -79.13
5998503.95 N 681252.97 E 1,500 -80.63
5998503.89 N 681252.93 E 1,500 -80.70
5998503.84 N 681252.89 £ 1.500 -80.75
5998503.84 N 681252.89 E 0.000 -80,75
5998503.84 N 681252,89 E 0.000 -80.75
5998503.38 N 681253.95 E 1.500 -79,88
5998501.87 N 681257.41 E 1.500 -77.04
5998499.31 N 681263.27 E 1,500 -72.23
5998495.70 N 681271.52 E 1.500 -65.46
5998491.05 N 681282.15 E 1.500 -56.74
5998488.96 N 681286.95 E 1.500 -52.80
5998485.34 N 681295.49 E 2.500 -45.75
5998478.47 N 681312.84 E 2.500 -31.30
5998470.44 1'4 681334.30 E 2.500 -13.28
Alaska State Plane Zone 4
Point Mclntyre Pad 2
Comment
Start Dir @ 1.000°/100ft · 400.00fl MD, 400.00ft ']-VD
Dir Rate Increase @ 1.500°/100ft: 800.00ft MD, 799.68ft TVD
_.
End Dir' 1192.22ft MD, 1189.35ft TVD
Stad Dir @ 1.500°/100fi' 1222.22ft MD, 1218.98ft TVD
BASE PERMAFROT
End DIr' 1822.22fl MD, 1816.51ff TVD
Start Dir @ 1.5000/100ft: 2205.71ft MD, 2200.00ft TVD
Dir Rate Increase @ 2.500°/100ft ' 2739.04ft MD, 2731.60ft TVD
Continued...
25 September, 1998 - 9:23 - I - DrillQuest
Shared Services Drilling
Point Mclntrye
Measured
Depth
(ft)
Incl. Azim.
3100.00 16.965 110.658
3200.00 19.48I 110.378
3300.00 21.977 110.003
3300.92 22.000 110.000
3400.00 24.204 104.910
3500.00 26.572 100.610
3600.00 29.050 96.980
3700.00 31.611 93.882
3800.00 34.236 91.210
3806.80 34.417 91.041
3900.00 36.912 88.877
4000.00 39.628 86.820
4100.00 42.377 84.986
-4158.59 44.000 84.000
· '4238.66 44.000 84.000
4859.79 44.000 84.000
5000.00 44.000 84.000
5197.87 44.000 84.000
5350.79 44.000 84.000
5560.98 44.000 84.000
5600.00 45.561 84.000
5700.00 49.561 84.000
5800.00 53.561 84.000
5854.42 55.737 84.000
5900.00 57.561 84.000
6000.00 61.561 84.000
6100.00 65.561 84.000
6200.00 69.561 84.000
6210.98 70.000 84.000
6300.00 69.939 83.753
Sperry-Sun Drilling Services
Sub-Sea Vertical Local Coordinates
Depth Depth Northings Eastings
(ft) (ft) (ft) (ft)
3034.86 3083.66
3129.83 3178.63
3223.35 3272.15
3224.20 3273,00
3315.34 3364.14
3405.69 3454.49
3494.13 3542.93
3580,45 3629.25
3664.38 3713.18
3670,00 3718.80
3745.72 3794,52
3824.22 3873.02
3899.68 3948,48
3942.40 3991.20
4000.00 4048.80
4446.80 4495.60
4547.66 4596.46
4690.00 4738.80
~ q 4848.80
495~~1.2C 5000.00
4978.8g 5027.69
5046.36 5095.16
5108.52 5157.32
5140.00 5188.80
5165.06 5213.86
5215.7t 5264.51
5260.23 5309.03
5298.39 5347.19
5302.19 5350.99
5332.68 5381.48
Proposal Report for P2-08 (R) WP2
135.53 S 48.09 E
146.54 S 77.37 E
158.75 S 110.59 E
158.86 S 110.91E
170.44S 147.99 E
179.83 S 189.79 E
186.90 S 235.88 E
191.63 S 286.14 E
194.00 S 340.43E
194.07 S 344.26 E
194.00 S 398.59 E
191.65 S 460.47E
186.93 S 525.89 E
183.06 S 565.81 E
177.26 S 621.12 E
132.16 S 1050.23 E
121.98 S 1147.09 E
107.61 S 1283.80 E
96.51 S 1389.44E
81.25 S 1534.65 E
78.38 S 1561.98 E
70.66 S 1635.36 E
62.48 S 1713.24 E
57.84 S 1757.38 E
53.86 S 1795.25 E
44.85 S. 1880.98 E
35.49 $ 1970.01 E
25.83 S 2061.91 E
24.75 $ 2072.16 E
15.83 S 2155.32 E
Global Coordinates Dogleg Vertical
Northings Eastings Rate Section
(ft) (ft) (on0oft)
5998461.27 N 681359.82 E 2.500
5998450.97 N 681389.36 E 2.500
5998439.57 N 681422.87 E 2.500
5998439.46 N 681423.20 E 2.500
5998428.79 N 681460.54 E 3.000
5998420.41 N 681502.56 E 3.000
5998414.46 N 681548.81 E 3.000
5998410.96 N 681599.17 E 3.000
5998409.91 N 681653.49 E 3.000
5998409.93 N 681657.33 E 3.000
5998411.31 N 681711.64E 3.000
5998415.17 N 681773.44E 3.000
5998421.47 N 681838.73 E 3,000
5998426.29 N 681878.54E 3.000
5998433.45 N 681933.70 E 0.000
5998488.95 N 682361.59 E 0.000
5998501.48 N 682458.18 E 0.000
5998519.16 N 682594.49 E 0.000
5998532.82 N 682699.83 E 0.000
5998551.60 N 682844.63 E 0.000
5998555.14 N 682871.88 E 4.000
5998564.63 N 682945.06 E 4.000
5998574.70 N 683022.72 E 4.000
5998580.41 N 683066.73 E 4.000
5998585.31 N 683104.49 E 4.000
5998596.39 N 683189.97 E 4.000
5998607.91 N 683278.75 E 4.000
5998619.80 N 683370.39 E 4.000
599862t.12 N 683380.61 E 4.000
5998632.06 N 683463.53 E 0.269
Alaska State Plane Zone 4
Point Mcintyre Pad 2
Comment
8.27
33.30
61.78
62.06
94.42
Dir Rate Increase @ 3.000°/100ft: 3300.92ft MD, 3273.00ft TVD
131.93
174.20
221.13
272.59
276.25
SV4 [Estimate]
328.43
388.50
452.63
492.03 End Dir: 4158.59ft MD, 3991.20ft TVD
546.76 . Top Stuck Pipe Zone
971.36
1067.21
1202.47
1307.01
1450.69
Sail @ 44.000° Inclination on 84.000° Azimuth
T-3 (SV-1)
9 5/8' Casino
Bottom StucE Pipe Zone
Start Dir @ 4.000°/100ft: 5560.98ft MD, 5000.00fl 'i-VD
1477.74
1550.35
1627.41
1671.09 K-15
1708.55
1793.38
1881.48
1972.41
1982.56
2064.89
BHA Tendency @ 0.269°/100ft: 6210.98ft MD, 5350.99ft TVD
Continued...
25 September, 1998 - 9:23 - 2 - Dr[I/Quest
Shared Services Drilling
Point Mcintrye
Measured
Depth
(ft)
Incl. Azim.
Sub-Sea
Depth
(ft)
Sperry-Sun Drifting Services
Vertical Local Coordinates
Depth Northings Eastings
(ft) (ft) (ft)
6400.00 69.870 83.476 5367.03 5415.83
6500.00 69.802 83.198 5401.51 5450.31
6600.00 69.734 82.920 5436.09 5484.89
6700.00 69.667 82.642 5470.78 5519.58
6800.00 69.600 82.363 5505.58 5554.38
6900.00 69.534 82.084 5540.49 5589.29
7000.00 69.468 81.805 5575.51 5624.31
7100.00 69.403 81.526 5610.64 5659.44
7200.00 69.338 81.247 5645.87 5694.67
7300.00 69.273 80.967 5681.21 5730.01
7400.00 69.209 80.687 5716.65 5765.45
7500.00 69,146 80.407 5752.20 5801.00
7600.00 69.083 80,126 5787.85 5836.65
-7700.00 69.020 79.846 5823.60 5872.40
7800.00 68.958 79.565 5859.46 5908.26
7900.00 68.896 79.284 5895.41 5944,21
8000.00 68.835 79.002 5931.47 5980,27
8100.00 68.774 78.721 5967.63 6016,43
8200.00 68.713 78.439 6003.88 6052.68
8300.00 68.653 78.157 6040.23 6089.03
8400.00 68.594 77.875 6076.68 6125.48
8500.00 68.535 77.592 6113.23 6162.03
8600.00 68.476 77.309 6149.87 6198.67
8700.00 68.418 77.027 6186.60 6235.40
8800.00 68.361 76.743 6223.43 6272.23
8900.00 68.304 76.460 6260.36 6309.16
9000.00 68.247 76.176 6297.37 6346.17
9100.00 68.191 75.892 6334.48 6383.28
9200.00 68.136 75.608 6371.67 6420.47
9300.00 68.080 75.324 6408.96 6457.76
Proposal Report for P2-08 (R) WP2
5.39 S 2248.64 E
5.50 N 2341.88 E
16.84 N 2435.02 E
28.63 N 2528.07 E
40.86 N 2621.02 E
53.54N 2713.86 E
66.67 N 2806.61 E
80,24 N 2899.25 E
94.26 N 2991.78 E
108.72 N 3084.20 E
123.62 N 3176.51 E
138.98 N 3268.71E
154.77 N 3360.80 E
171.01 N 3452.76 E
187.69 N 3544.61 E
204.82 N 3636.34 E
222.39 N 3727.94 E
240,40 N 3819.42 E
258.85 N 3910.77 E
277.75 N 4002.00 E
297.08 N 4093.09 E
316.86 N 4184.04 E
337.07 N 4274_87 E
357.73 N 4365.55 E
378.83 N 4456.10 E
400.36 N 4546.50 E
422.33 N 4636.76 E
444.75 N 4726.88 E
467.59 N 4816.85 E
490.88 N 4906.67 E
Global Coordinates Dogleg Vertical
Northings Eastings Rate Section
(ft) (ft) (°/~OOft) (ft)
5998644.76 N 683556.57 E 0.269 2157.41
5998657.92 N 683649.52 E 0.269 2249.98
5998671.51 N 683742.36 E 0.269 2342.57
5998685.55 N 683835.09 E 0.269 2435.20
5998700.04 N 683927.71 E 0.269 2527.86
5998714.96 N 684020.23 E 0.269 2620.55
5998730.34 N 684112.62 E 0.269 2713.26
5998746.15 N 684204.91 E 0.269 2806.00
5998762.41 N 684297.07 E 0.269 2898.76
5998779.11 N 684389.12 E 0.269 2991.54
5998796.25 N 684481.04 E 0.269 3084.34
5998813.84 N 684572.84 E 0.269 3177.15
5998831.86 N 684664.51 E 0.269 3269.98
5998850.33 N 684756.06 E 0.269 3362.82
5998869.23 N 684847.47 E 0.269 3455.67
5998888.58 N 684938.76 E 0.269 3548.52
5998908.37 N 685029.91 E 0.269 3641.39
5998928.59 N 685120.92 E 0.269 3734.25
5998949.25 N 685211.80 E 0.269 3827.12
5998970.36 N 685302.54 E 0.269 3919.98
5998991.90 N 685393.13 E 0.269 4012.85
5999013.87 N 685483.58 E 0.269 4105.71
5999036.29 N 685573.89 E 0.269 4198.56
5999059.14 N 685664.05 E 0.269 4291.40
5999082.43N 685754.05 E 0.269 4384.24
5999106.15 N 685843.91E 0.269 4477.06
5999130.30 N 685933.61 E 0.269 4569.86
5999154.90 N 686023.16 E 0.269 4662.65
5999179.92 N 686112.54 E 0.269 4755.42
5999205.38 N 686201.77 E 0.269 4848.16
Comment
Alaska State Plane Zone 4
Point Mclntyre Pad 2
Continued...
:3:>
X
o
25 September, 1998 - 9:23 - 3 - DrillQuest
Shared Services Drilling
Point Mclntrye
Measured
'Depth
(ft)
Incl. Azim.
Sub-Sea
Depth
(ft)
Sperry-Sun Drilling Services
Vertical Local Coordinates
Depth Northings Eastings
(ft) (ft) (ft)
Proposal Report for P2-08 (R) WP2
9400.00 68.026 75.040 6446.33 6495.13
9500.00 67.972 74.755 6483.80 6532.60
9600.00 67.918 74.470 6521.35 6570.15
9700.00 67.865 74.185 6558.98 6607.78
9800.00 67.812 73.899 6596.70 6645.50
9900.00 67.760 73.614 6634.51 6683.31
10000.00 67.708 73.328 6672.40 6721.20
10100.00 67.657 73.042 6710.37 6759.17
10200.00 67.607 72.756 6748.43 6797.23
10300.00 67.556 72.469 6786.57 6835.37
10400.00 67.507 72.183 6824.79 6873.59
10500.00 67.458 71.896 6863.08 6911.88
10600.00 67.409 71,609 6901.46 6950.26
t0700.00 67,361 71,321 6939.91 6988.71
10800.00 67.313 71.034 6978.44 7027.24
10900.00 67,266 70.746 7017.05 7065.85
10920.57 67.256 70.687 7025.00 7073.80
11000,00 67,220 70.459 7055.73 7104,53
11100,00 67.173 70,170 7094.49 7143.29
11121.41 67.164 70,109 7102.80 7151.60
11200.00 67.128 69.882 7133.32 7182.12
11300.00 67.083 69,594 7172.23 7221.03
11400.00 67,038 69,305 7211.20 7260,00
11500.00 66.994 69,016 7250.25 7299.05
11600.00 66,951 66.727 7289.37 7338.17
11700.00 66.908 68.438 7328.55 7377.35
11800.00 66.866 68.149 7367.81 7416.61
11900.00 66.824 67.859 7407.13 7455.93
~2000.00 66.782 67.570 7446.52 7495.32
12100.00 66.742 67,280 7485.97 7534.77
514.60 N 4996.34 E
538.76 N 5085.85 E
563.35 N 5175.21 E
588.38 N 5264.41E
613.84 N 5353.46 E
639.74 N 5442.34 E
666.07 N 5531.06 E
692.83 N 5619.61 E
720.02 N 5708.00 E
747.65 N 5796.22 E
775.70 N 5884.26 E
804.19 N 5972.14 E
833.10 N 6059.84 E
862.45 N 6147.36 E
892.22 N 6234.70 E
922.42 N 6321.87 E
928.68 N 6339.77 E
953.04 N 6408.85 E
984.10 N 6495.64 E
990.80 N 6514,21E
1015.58 N 6582.25 E
1047.48 N 6668.68E
1079.81 N 6754.91 E
1112.56 N 6840.95 E
1145.73 N 6926.79 E
1179.32 N 7012.44E
1213.34 N 7097.89 E
1247.78 N 7183.14 E
1282.63 N 7268.19 E
1317.91 N 7353.04 E
Global Coordinates Dogleg Vertical
Northings Eastings Rate Section
(.) (.) (°/~00.) (ft)
5999231.27 N 686290,84 E 0.269 4940.89
5999257.59 N 686379.74 E 0.269 5033.59
5999284.35 N 686468.48 E 0,269 5126.26
5999311.53 N 686557.05 E 0,269 5218.90
5999339.15 N 686645.45 E 0.269 5311.51
5999367.19 N 686733.67 E 0.269 5404.09
5999395.66 N 686821.73 E 0.269 5496.63
5999424.57 N 686909.61 E 0.269 5589.14
5999453.90 N 686997.31 E 0,269 5681.60
5999483.65 N 687084.83 E 0,269 5774.03
5999513.84 N 687172.17 E 0.269 5866.41
5999544.45N 687259.33 E 0,269 5958.74
5999575.48 N 687346.30 E 0.269 6051.03
5999606.94 N 687433.08 E 0,269 6143.26
5999638.82 N 687519.68 E 0.269 6235.45
5999671.13 N 687606.08 E 0.269 6327.58
5999677.82 N 687623.83 E 0.269 6346.52
5999703.86 N 687692.30 E 0.269 6419.66
5999737.01 N 687778.31 E 0,269 6511.67
5999744.16 N 687796.71 E 0,269 6531.37
5999770.58 N 687864.13 E 0,269 6603,63
5999804.57 N 687949.76 E 0.269 6695.52
5999838.98 N 688035.18 E 0.269 6787.36
5999873.80 N 688120.40 E 0,269 6879.12
5999909.05 N 688205.41 E 0.269 6970.82
5999944.71 N 688290.22 E 0_269 7062.4-4
5999980,79 N 688374,82 E 0.269 7154.00
6000017.29 N 688459.21 E 0.269 7245.48
6000054.20 N 688543.39 E 0.269 7336.88
6000091.52 N 688627,36 E 0.269 7428.21
Comment
WEST SAK (SEISMIC TOP)
Top Colviile [Estimate]
Alaska State Plane Zone 4
Point Mclntyre Pad 2
Continued,..
25 September, 1998 - 9:23 4 DrillQuest
Shared Services Drilling
Point Mclntrye
Measured
Depth
(it)
Incl. Azim.
Sub-Sea
Depth
(it)
Sperry-Sun Drilling Services
Vertical Local Coordinates
Depth Northings Eastings
(it) (it)
12200.00 66.701 66.990 7525.49 7574,29
12300.00 66.661 66.699 7565.08 7613.88
12400.00 66.622 66.409 7604.73 7653.53
12500.00 66.584 66.118 7644.44 7693.24
12600.00 66.545 65.828 7684.21 7733.01
12700.00 66.508 65.537 7724.04 7772.84
12800.00 66.471 65.246 7763.93 7812.73
12900.00 66.434 64.954 7803.88 7852.68
13000.00 66.398 64.663 7843.89 7892.69
13100.00 66.363 64.371 7883.96 7932.76
13200.00 66.328 64.080 7924.08 7972.88
13300.00 66.294 63.788 7964.26 8013.06
13400.00 66.260 63.496 8004.49 8053.29
13500.00 66.227 63.203 8044.78 8093.58
13600.00 66.194 62.911 6085.12 8133.92
13700.00 66.162 62.619 8125.51 8174.31
13800.00 66.130 62.326 8165.95 8214.75
13900.00 66.099 62.033 8206.44 8255.24
14000.00 66.069 61.740 8246.98 8295.78
14100.00 66.039 61.447 8287.57 8336.37
14200.00 66,009 61.154 8328.20 8377.00
14300.00 65.980 60.861 8368.88 8417.68
14400.00 65.952 60.567 8409.61 8458.41
14500.00 65.924 60.274 8450.38 8499.18
14600.00 65.897 59.980 8491.20 8540.00
14700.00 65.871 59.686 8532.06 8580.86
14800.00 65.845 59.392 8572.96 8621.76
14900.00 65.819 59.098 8613.90 8662.70
15000.00 65.794 58.804 8654.88 R703.68
15100.00 65.770 58.510 8695.90 8744.70
25 September, 1998 - 9:23
Proposal Report for P2-08 (R) WP2
1353.60 N 7437.68 E
1389.71 N 7522.11 E
1426.24 N 7606.34 E
1463.18 N 7690.35 E
1500.54 N 7774.15 E
1538.31N 7857.74 E
1576.50 N 7941.11 E
1615.10 N 8024.26 E
. 1654.10 N 8107.19 E
1693.52 N 8189.90 E
1733.35 N 8272.38 E
1773.59 N 8354.64 E
1814.24 N 8436.68 E
185529 N 8518.48 E
1896.75 N 8600.05 E
1938.62 N 8681.39 E
1980.89 N 8762.49 E
2023.56 N 8843.36 E
2066.64 N 8923.99 E
2110.11 N 9004.38 E
2153.99 N 9084.52 E
2198.27 N 9164.42 E
2242.95 N 9244.08 E
2288.02 N 9323.49 E
2333.49 N 9402.65 E
2379.36 N 9481.56 E
2425.62 N 9560.22 E
2472.27 N 9638.63 E
2519.32 N 9716.77 E
2566.76 N 9794.66 E
Global Coordinates Dogleg Vertical
Northings Eastings Rate Section
(it) (f-t) (°/lOOft) (it)
6000129.26 N 688711.11 E 0.269 7519.46
6000167.41 N 688794.64 E 0.269 7610.62
6000205.97 N 688877.95 E 0.269 7701.70
6000244.94 N 688961.05 E 0.269 7792.69
6000284.32 N 689043.92 E 0.269 7883.60
6000324.11 N 689126.56 E 0.269 7974.41
6000364.30 N 689208.98 E 0.269 8065.13
6000404.91 N 689291.17 E 0.269 8155.76
6000445.92 N 689373.13 E 0.269 824629
6000487.33 N 689454.86 E 0.269 8336.72
6000529.15 N 689536.35 E 0.269 8427.06
6000571.38 N 689617.61 E 0.269 8517.29
6000614.00 N 689698.63 E 0.269 8607.41
6000657.03 N 689779.41 E 0.269 8697.43
6000700.45N 689859.96 E 0.269 8787.34
6000744.28 N 689940.25 E 0.269 8877.15
6000788.51 N 690020.31 E 0.269 8966.83
6000833.13 N 690100.12 E 0.269 9056.41
6000878.15 N 690179.68 E 0.269 9145.87
6000923.56 N 690258.99 E 0.269 9235.21
6000969.37 N 690338.04 E 0.269 9324.43
6001015.57 N 690416.85 E 0.269 9413.52
6001062.17 N 690495.40 E 0.269 9502.50
6001109.16 N 690573.69 E 0.269 9591.34
6001156.54 N 690651.73 E 0.269 9680.06
6001204.30 N 690729.50 E 0.269 9768.65
6001252.46 N 690807.01 E 0.269 9857.11
6001301.00 N 690884.26 E 0.269 9945.43
6001349.93 N 690961.25 E 0.269 10033.62
6001399.24 N 691037.96 E 0.269 10121.67
-5-
Comment
Alaska State Plane Zone 4
Point Mclntyre Pad 2
Continued...
DrillQuest
Sperry-Sun Drilling Services
Proposal Report for P2-08 (R) WP2
Shared Services Drilling
Point Mcintrye
Measured Sub-Sea Vertical Local Coordinates
Depth Incl. Azim. Depth Depth Northings Eastings
(ft) (ft) (ft) (ft) (ft)
15200.00 65.746 58.215 8736.96 8785.76 2614.58 N 9872.29 E
15300.00 65.723 57.921 8778.06 8826.86 2662.80 N 9949.66 E
15400.00 65.701 57.626 8819.19 8867.99 2711.41 N 10026.77 E
15500.00 65.678 57.331 8860.36 8909.16 2760.40 N 10103.61 E
15600.00 65.657 57.037 8901.56 8950.36 2809.78 N 10180.19 E
15700.00 65.636 56.742 8942.80 8991.60 2859.55 N 10256.50 E
15717.46 65.632 56.690 8950.00 8998.80 2868.28 N 10269.79 E
15753.81 65.625 56.583 8965.00 9013.80 2886.49 N 10297.45 E
15790.15 65.618 56.476 8980.00 9028.80 2904.74 N 10325.06 E
15800.00 65.611 56.448 8984.07 9032.87 2909.70 N 10332.54 E
15887.40 65.551 56.198 9020.20 9069.00 2953.83 N 10398.77 E
15900.00 65.542 56.162 9025.41 9074.21 2960.21 N 10408.29 E
~16000.00 65.474 55.876 9066.87 9115.67 3011.07 N 10483.75 E
16005.13 65.470 55.862 9069.00 9117.80 3013.69 N 10487.61 E
16100.00 65.405 55.590 9108.44 9157.24 3062.28 N 10558.92 E
16145.13 65.374 55.461 9127.23 9176.03 3085.51 N 10592.74 E
Global Coordinates Dogleg Vertical
Northings Eastings Rate Section
(fl) (fi) (°/lOOff) (fl)
6001448.94 N 691114.41 E 0.269 10209.58
6001499.02 N 691190.59 E 0.269 10297.34
6001549.49 N 691266.49 E 0.269 10384.97
6001600.33 N 691342.12 E 0.269 10472.44
6001651.55 N 691417.48 E 0.269 10559.78
6001703.16 N 691492.56 E 0.269 10646.96
6001712.21 N 691505.64 E 0.269 10662.16
6001731.08 N 691532.84 E 0.269 10693.81
6001750.00 N 691560.00 E 0.269 10725.42
6001755.14 N 691567.35 E 0.269 10733.99
6001800.86 N 691632.49 E 0.269 10809.91
6001807.47 N 691641.86 E 0.269 10820.84
6001860.15 N 691716.07 E 0.269 10907.52
6001862.86 N 691719.86 E 0.269 10911.96
6001913.17 N 691789.97 E 0.269 10994.01
6001937.21 N 691823.22 E 0.269 11032.98
All data is in feet unless otherwise stated. Directions and coordinates are relative to True North.
Vertical depths are relative to Well Reference. Northings and Eastings are relative to Well Reference.
The Dogleg Severity is in Degrees per 100ft.
Vertical Section is from Well Reference and calculated along an Azimuth of 73.760° (True).
Based upon Minimum Curvature type calculations, at a Measured Depth of 16145.13ft.,
The Bottom Hole Displacement is 11032.98ft., in the Direction of 73.760° (True).
Comment
HRZ
KALUBIK
TKUP
Target: P2-R, 200.00 Radius., Geological
WOC
Tot~al Depth ' 16145.13ft MD, 9176.03ft TVD
7" Casing
Alaska State Plane Zone 4
Point Mcintyre Pad 2
25 September, 1998 - 9:23
-6-
Continued...
OrillOuest
TONY KNOWLES, GOVERNOR
ALASKA OIL AND GAS
CONSERVATION COMMISSION
3001 PORCUPINE DRIVE
ANCHORAGE, ALASKA 99501-3192
PHONE: (907) 279-1433
FAX: (907) 276-7542
July 1. 1998
Lowell Crane
Drilling cngineering Supctwisor
B P Exploration (Alaska), Inc.
POBox 196612
Anchorage, AK 99519-6612
Rc'
Point Mclntvre P2-08
B P Exploration (Alaska), Inc.
Permit No. 98-123
Sur. Loc. 18'NSL, 1073'EWL. Sec. 11. T12N. R14E. UM
Btmnholc Loc. 4424'NSL. 209'EWL. Sec. 6. T12N. R15E. UM
Dear Mr. Crane:
Enclosed is the approved application for permit to drill thc above referenced well.
Thc pcrmit to drill docs not cxcmpt you from obtaining additional permits required by law from
othcr govcrnmcntal agcncics, and docs not authorizc conducting drilling opcrations until all ~ther
required permitting determinations arc made.
Blowout prcvcntion cquipmcnt (BOPE) must be tested in accordance with 20 AAC 25 035.
Sufficient noticc (approximatcly 24 hours) must be givcn to alloxv a rcprcscntativc of thc
Commission to witncss a tcst of BOPE installed prior to drilling ncw hole. Notice max' be given
bx' contacting thc Commission pctrolcum ficld inspector on thc North Slope pager at 659-3607.
Si ec
Commissioncr
BY ORDER OF THE COMMISSION
dlf/Enclosurcs
CC~
Department of Fish & Game. Habitat Section xv/o cncl.
Dcpartmcnt of Environmcntal Conscrw'ation xv/o cncl.
? STATE OF ALASKA
ALASKA--,~L AND GAS CONSERVATION COM?¢:ISSION
PERMIT TO DRILL
20 AAC 25.005 Request for Diverter Waiver
la. Type of work [] Drill [] Redrill lb. Type of well ~ Exploratory [] Stratigraphic Test I--I Development Oil
[] Re-Entry [] Deepen []Service [] Development Gas []Single Zone [] Multiple Zone
2. Name of Operator 5. Datum Elevation (DF or KB) 10. Field and Pool
ARCO Alaska Inc. Plan RTE = 49' Point Mclntyre
3. Address 6. Property Designation
P.O. Box 196612, Anchorage, Alaska 99519-6612 ADL365548
4. Location of well at surface 7. Unit or Property Name 11. Type Bond (See 20 AAC 25.025)
18' NSL, 1073' EWL, SEC. 11, T12N, R14E, UM Point Mclntyre
At top of productive interval 8. Well Number Number U-630610
4208' NSL, 50' EWL, SEC. 6, T12N, R15E, UM P2-08
At total depth 9. Approximate spud date Amount $200,000.00
4424' NSL, 209' EWL, SEC. 6, T12N, R15E, UM 07/05/98
12. Distance to nearest property line113. Distance to nearest well 14. Number of acres in property 15. Proposed depth (MD and TVD)
ADL Y1579, 856'I P2-09, 10.5' at 600' MD 3601.1 17419' MD / 9183' TVD
16. To be completed for deviated wells 17. Anticipated pressure {see 20 AAC 25.035 (e) (2)}
Kick Off Depth 400' MD Maximum Hole Angle 65° Maximum surface 3520 psig, At total depth (TVD) 8800' / 4400 psig
18. Casing Program Specifications Setting Depth
Size Top Bottom Quantity of Cement
Hole Casing Weight Grade Coupling Length MD TVD MD TVD (include stage data)
30" 20" 133# H-40 BTC 80' 49' 49' 129' 129' 260 sx Arctic Set (Approx.)
12-1/4" 9-5/8" 40# L-80 BTC-Mod 7914' 48' 48' 7962' 4949' ;'028 sx Coldset III, 754 sx'G'
8-3/4" 7" 26# L-80 BTCM 17372' 47' 47' 17419' 9183' __.61 sx Class 'G'
19. To be completed for Redrill, Re-entry, and Deepen Operations.
Present well condition summary
Total depth: measured feet Plugs (measured)
true vertical feet
Effective depth: measured feet Junk (measured)
true vertical feet
Casing Length Size Cemented MD TVD
Structural
Conductor
Surface
Intermediate
Production
Liner
Perforation depth: measured ; u- ,.~.' ~ ~ i,'?,'7 d
true vertical ~i~e!,-~ 0i! ;~: ¢~ ..........L.u~!S.
~20. Attachments [] Filing Fee [] Property Plat [] BOP Sketch [] Diverter Sketch [] Drilling Program
[] Drilling Fluid Program []Time vs Depth Pict [] Refraction Analysis [] Seabed Report [] 20 AAC 25.050 Requirements
Contact Engineer Name/Number: Greg ~obbs, 564-4191 Prepared By Name/Number: Carol Withey, 564-4114
21. I hereby certify that the f.e/rCgoing is true and correct to the best of my knowledge
S ig n ed Lowe,, (¢~,~,~~'/~_./..~ .T~flt~e Drilling Engineering Supervisor Date
Permit Number \,.~ I APl Number - C°mmissi°n Use OnlyI Approva_,l ~a~ See cover letter
3 I50- (:::) ~-. ~'-" 2..~. ~ /¢,,~" ~ "-~ for other requirements
Conditions of Approval: Samples Required []Yes I~ No Mud Log Required []Yes ~ No
Hydrogen Sulfide Measures ~Yes~] No Directional Survey Required ,[~Yes []No
Required Working Pressure for BOPE 1--12M; 1--13M; 1~5M; []10M; []15M
Other: t~ I~ by order of
sIGNED BYco
Approved By ORIGINAL ' mmissioner the commission Date
Form 10-401 Rev. 12-01-85
Robert N. Chri=ten~
Submit In Triplicate
.... STATE OF ALASKA ,~., COPY
ALASKA OIL AND GAS CONSERVATION COMMISSION
PERMIT TO DRILL
20 AAC 25.005 Request for Diverter Waiver
la. Typeofwork I~i;;i3Drill r-lRedrill Ilb. Typeofwell [-I Exploratory r--lStratigraphicTest r-] Development Oil
F-lRe-Entr~ I-IDeepenI I~Service E] Development Gas [-] Single Zone. F'lMultipleZone .....
2. Name of Operator 5. Datum Elevation (DF or KB) 10. Field and Pool
ARCO Alaska Inc. Plan RTE = 49' Point Mclntyre
3. Address 6. Property Designation
P.O. Box 196612, Anchorage, Alaska 99519-6612 ADL365548 _:.
4. Location of well at surface 7. Unit or Property Name 11. Type Bond (See 20 AAC 25.025)
18' NSL, 1073' EWL, SEC. 11, T12N, R14E, UM Point Mc. lntyre
At top of productive interval 8. Well Number Numb~' U-630610
4208' NSL, 50' EWL, SEC. 6, T12N, R15E, UM P2-08
At total .depth 9. Approximate spud date Amount $200,000.00
4424' NSL, 209' EWL, SEC. 6, T12N, R15E, UM 07/05/98
12. Distance to nearest Property line} l:~.'Distance to nearest well 14. Number of acres in property '1'5. 'ProPosed depth (MD and TVD)
ADL Y1579, 856'I P2-09, 10.5' at 600' MD 3601.1 17419' MD / 9183' TVD
16. To be completed for deviated wells 17. Anticipated pressure {see 20 AAC 25.035 (e) (2)}
Kick Off Depth 400' MD Maximum Hole Angle 65° Maximum surface 3520 psig, At total depth (TVD) 8800' / 4400 psig
~18. Casing Program Specifications Setting Depth
Size Top Bottom Quantity of Cement
Hole Casing Weight Grade Coupling Length MD TVD MD TVD (include stage data)
30" 20" 133# H-40 ' " BTC 80' 49' 49' 129' 129.'. 260 sx Arctic Set (Approx.)
12-1/4" 9-5/8" 40# L-80 BTC-Mod 7914' 48' 48' 7962' 4949' 2028 sx Coldset III, 754 sx 'G'
8-3/4" 7" 26# L-80 BTCM 17372' 47' 47' 17419' '9183' 261 sx Class 'G'
19. To be completed for Redrill, Re-entry, and Deepen Operations.
Present well condition summary
Total depth: measured feet Plugs (measured)
true vertical feet
Effective depth: measured feet Junk (measured)
true vertical feet
Casing Length Size Cemented MD TVD
Structural
Conductor
Surface
Intermediate
Production
Liner ~" : ...... ~ ~: · ....
DUPLICATE
Perforation depth: measured
.~ ..... ;,, ~ . .... ..~.. !-;..-~.,
:.,.~.,- ~.. ; ,' . · . - .... ...... ~ =
true vertical ..
20. Attachments [] Filing Fee [] Property Plat [] BOP Sketch [] Diverter Sketch [] Drilling Program
[] Drilling Fluid Program []Time vs Depth PIct [] Refraction Analysis [] Seabed Report [] 20 AAC 25.050 Requirements
, .
Contact Engineer Name/Number: Greg ~obbs, 564-4191 Prepared By Name/Number: Carol Withey, 564-4114
21. I hereby certify that the f/,~going¢/is true and correct to the best of my knowledge
Sig ned Lowe, (~(~4~4¢'.~-~/~~ ---- ----T-it-le Drillin~l Engineering Supervisor Date d~- 17-~'~
/ .,~ - Commission Use Only
Permit Number ,.,/ I APl Number ~ __ ~ ~--~_ ~- I ApEroval Data ,.., See cover letter
50 ~---- ,~-~---- 7~:~ ,.-,
? ~::~"/.2-,~.~ { - /~" I '~7 ~ ~ ~ for other requirements
Conditions of Approval: Samples Required []Yes f~No Mud Log Required r-lYes I~No
Hydrogen Sulfide Measures I~Yes r-INo Directional Survey Required ~Yes EINo
Required Working Pressure for DOPE [] 2M; [] 3M; /~ SM; [] 10M; [] 15M
Other: .~.41"/ ORIGINALRobert N. SIGNED.I~y by order of
Christenson
Approved By _ Commissioner the commission Date 7'",¢,/.
.q,~ ~hmif In Trinli~.Rtp.
I Well Name: I P2-08 !
I Type of Well (producer or injector): I Injector
Surface Location: 18' FSL, 1073' FWL, T 12N, R 14E, S 11
Target Location: 4208' FSL, 50' FWL, T 12N, R 15E, S 6
Bottom Hole 4424' FSL, 209' FWL, T 12N, R 15E, S 6
Location: -~
I AFE Number:
12B0221
I Rig: I NABORS33E
27
I MD: J17419' I WD: 19~83' I IRTE: 149-0
IWell Design (conventional, slimhole, etc.):
IUltra-Slimhole 7" Longstring, 4-1/2" L-80
tbg
Formation Markers:
Formation Tops MD TVD
Base of 1815 1784
Permafrost
SV4 5OOO 3719
SV1 (T3) 7512 4759
9 5/8" Casing 7962 4949 9-5/8" csg shoe below SV1 & above
Point K-15
K15 (Ugnu) 8529 5189
West Sak 12893 7094 9.5 ppg minlmum mud weight
required.
K-10 16978' 8'976 9.6-9.9 EMW to this depth. 3% 10.3
ppg KCI GEM System at 500' ABOVE
K-10.
HRZ 17063 9016 K-5/HRZ same depth. 10.5 ppg at 60
degree angle plus recommended.
Kalubik 17105 9036
Kuparu k 17114 9040
OWC 17279 9117
TD 17419 9183 7" casing shoe. 140' MD below OWC.
10.6 ppg IF MiluYeach is penetrated.
Casing/Tubing Pro(, ram:
Hole csg/Tbg Wt/Ft Grade Conn Length Top Btm
Size O.D. MD/TVD MD/TVD
30" 20" 133# H40 BTC 80' 49/49' 129'/129'
12 1/4" 9 5/8" 40# L-80 BTC-Mod 7914' 48/48' 7962'/4949'
8 3/4" 7" 26# L-80 BTCM 17372' 47/47' ,17419'/9183'
Tubing 4 1/2" 1'2.6# L-80 BTCM 16968' 46'/46' 17014'/8922'
Mud Program:
j iecti°n
Surface Mud Properties: Spud 112 1/4" hole
Density (ppg) ~unnel Vis Yield Point 10 sec gel 10 min gel
8.7-9.5 ~ 100-300 30-70 20-60 40-80
pH Fluid Loss
9-10 15 - 25cc
Production Mud Properties: LSND 18 3/4" hole section
Density(ppg)lFunnelVis YieldPoint IlOsecgelllOmingel
8.8-9.9 I 40-55 18-22 5-15 < 30
pH Fluid Loss
9.0-9.5 4-6cc
Production Mud Properties: 3% KCL 18-3/4" hole section, GEM
Density (ppg) Plastic Vis Yield Point 10 sec 10 min
gel gel
10.3-10.6 8-15 15-25 8-15 < 30
pH
9.0-9.5
Fluid<5ccLOSs
Cement Data:
Casing First Stage: Second Stage: Comments
Sxs/VVt/Yield Sxs/Wt/Yield
9-5/8" surface Coldset II1: 1028/12.2/1.92 Two stage job:
casing 1000/12.2/1.92 (assumes 200% First stage Coldset III lead
to 7962' excess in from 2100'-6188'@ 50%
ES cementer Class G: permafrost) excess followed by Class
@ at 2100' 754/15.8/1.15 G tail from shoe to 6188'
MD. (750' TVD) @ 50% excess
+ 80' shoe.
Second stage Coldset III
circulated to surface.
Casing/Liner Lead:Sxs/Wt/Yield Tail:Sxs/~N~ield Comments
7" none 261/15.8/1.19 Class "G". Volume based
on cement to 1000' above
the Kuparuk with 50%
excess + 80' shoe.
Logging Program:
I Open Hole Logs:
ICased Hole Logs:
12 1/4" MWD/multi-shots as directional survey.
MWD/LWD GR/RES to 500' above K-10.
MWD/LWD GR/RES/DEN/NEU (Triple Combo) to TD.
CBT-CET (Required/Injector). There-is a possibility for a Gyro
also.
Well Control:
Well control equipment consisting of 5000 psi W.P. pipe rams, blind rams, and annular preventer
will be installed and is capable of handling maximum potential surface pressures.
It is requested that the diverter be waived for this well. The diverter would point at Manifold
buildings or other wells with the design of N-33E. There has never been any surface gas
reported in any of the PM-2 drilling programs.
BOPE and drilling fluid system schematics on file with AOGCC.
Directional:
KOP:
Maximum Hole Angle:
Close Approach Wells:
400' MD
65 degrees
P2-03 55.6' Allowable Deviation @ 802'
(Flowing)
P2-06 25.4' Allowable Deviation @ 497'
(si)
P2-07 10.7' Allowable Deviation @ 602'
(S~)
P2-09 10.5' Allowable Deviation @ 600'
(so
P2-10 27.9' Allowable Deviation @ 502'
(S~)
P2-12 50.4' Allowable Deviation @ 2264'
(S~)
P2-13 31.1' Allowable Deviation @ 1402'
(Si)
P2-15 73.0' Allowable Deviation @ 3466'
(S~)
P2-22 65.6' Allowable Deviation @ 2619'
(S~)
Drilling and Completion Scope
1. Move rig to P2-08. NU riser and flowlines.
2. Drill 12-1/4" surface hole to- 7962' MD.
3. Run and cement 9 5/8" casing. Cement to surface.
4. RIH with 8-3/4" bit, MWD DIR/GR RES to float collar.
.5. PT casing to 3000 psi for 30 min. Record on chart.
d. Drill out 20', perform LOT. Record on chart '
?. Drill 8-3/4" production hole with MWD DIR/GR RES to 500' MD above the K-10.
LWD Triple Combo and Bit. Swap to 10.3 PPG 3% KCI/GEM system.
8. Drill 8-3/4" production hole to 17,419' MD.
cp. Run/cement 7" long string.
]0. Run 4-1/2" L-80 tubing with 7"x4-1/2" packer, 4-1/2" SSSV, and 2 4-1/2"xl" GLMs.
! !. Secure well, RDMO.
POOH for
Drilling Hazards/Continqencies
· The original reservoir pressure is 4377 psi at 8800' ss. The expected reservoir pressure is
4400 psi at 8800' ss. Abnormally pressured formations are not expected in this well. The
10.3 ppg mud will overbalance the anticipated pressure by 300 psi.
· Tight hole has been experienced in the lower Sagavanirktok, below the surface casing shoe
which were set into the SV4 sand. This has caused stuck pipe incidents and bit/BHA bailing
Gumbo problems.
· Coal stringers/SV Sands in the lower Ugnu have caused stuck pipe.
· No major instances of lost circulation problems have occurred on Pt Mac 2 wells.
Disposal
· Cuttings Handling: Cuttings should be hauled to the ball mill at CC-2A.
· Fluid Handling: Haul all drilling and completion fluids and other Class II wastes to CC-2A for
injection. Haul all Class I wastes to Pad 3 for disposal. In addition, haul all cuttings from
drilling operations to CC-2A for disposal, except any metal cuttings which will be sent to the
North Slope Borough.
GH 06/15/98
TREE: 4-1/16"-5M L-80 '
GL-SL = 12.8'
Gen 5 Type :;
2100
9-5/8", 40~/ff, L-80 I 7962' ~ ~
BTC 8.835" ID
GAS Ll~ MANDRELS
KOP: 400'
MAX ANGLE: 65° ~ 3579'MD ~ N~ MD(EKE) TVDss
4-1/2" 12.6ff L-g0 BTC TUBING I
CAPACITY: 0.01522 BBU~
: ...
.
PERFORATION SUMMARY:
Size Inte~al SPF Open/Sqzd
tbd
....
~- 4-1/2" WLEG 17014'
MARKER JOINT (20') ABOVE
KUPARUK BUT BELOW
7" shoe at ~
DATE REV, BY COMMENTS Point Dclntvre
WELL: P2-08
06/15/98 GH P~NNED COMPLETION APl NO: 50-029-
Shared Services Brilling
./ J
DrillQuesf
SURFACE LOCATION
PLOT DATE
chef. keri Ely '.
Propoa,l Dala tar P2-08 (M) WP3
vertical attain: we~t
HO~ Odg~: Well
Uoas~rom~tUnl~: II
Nodh R~e~; Trna No~
o~eQ ~vod~: . Deoma~ pet 100~1
Ve~ 6e~on A~mu~: ~.~75·
Veql~ Se~ O~lp~n; W~I Re~oron~
Vo~l~ ~0~1~ O~n; 0,~ N,0.~
Measured ~¢I, ~m. Ve~e~ No~ln~e Eps~g~ V~¢~1 Dogleg
8~,~ 4,~ 20 ~ 7~,~R 13.12 N 4.~ ~ 13.65 l.~
liS4.S5 10.~ 25.~ 1151,37 S~tl N 30.2I U ~l.15 2.~
10~.46 2i.~ 25,~ 198~,~3 2~1.~ N 131,~2 8 2'Ja.92 0.~
357~ ~ 65.~ 50,~ 3~6z4 [034,~7 N 8~.S4 8 ~.01 3.~
1~2~B33 61,~ ~AIT 91 lT.40 ~2
174t~ ~3 6t.114 3b.215 9183,~ 9692.1~ N 9083,7~ E 137~ 0.129
O ~
;~ZTO0
Proposal Target Summary
Targ~ Name- '['VD.~s: TVDrkb; Wcllhead Ot't's¢Ls:
I"~2-M TARGET 8091,00 9039,80 9476.11 N, 9524.27 E
cOlobat Coordin,',te.q:
6008300,00 lq, 6906(X).00 E
OP: Start Dir @ 1,000°/100ft: 40O,00~t MD, 400,00ti TVD
tad DIr @ 1' 500o/100fl · 800.00fi MD, 799,68f! TVD
tart Dir @ ~'.000°/10Citt': 1000 00ft MD, 998.73ft TVD
tart DIr @ 2.000°/100ft: 1154J3BIt MD, 1151.37ft TVD
End Dir, Sail ~ 21.d00°: 1704.35fl MD, 1880,55ft TVD
DIr @ 3.000°/100It: 2o30.46ft MD, 1985,00ft TVD
Dir, Sail @ 65.000° ' 3578.89ft MD, 3096.64ff TVO
4200,00
;
9 5/8" Casing
7961.57 MD
.,,A948.80 TVD
.................................................................................... 2: -.~ (,¥ ~ ,1)
Tendency ~ 0,144'/100~: 8555.96~'~5;~4~'~'~,, ·
8100
II
O
~cale: linoh = 270Oft
1~0~~ Total 0epth: 1741B.53~D. 91~
"'"'"'""'"'"'""'"'"'"" ..... "'"'"'""'""'"'"'"'"'"'""'""',,~~ ~,,,,,~~,,,,,,~,9~
BHA Tendeng~ ~ 0 129'/100fi, 17113~7fl MD, ~0ff~-~,'
................................................................... ; ............. ~., ~.'~ ~ ~ ~Y~,~'2. J- ~.~
~039,80 ~O ~0~' RADI~S 17418,53 MD
9476, I1 N, 9524.27
2700 5400 ~1 O0 10800 ~3500
Ve~ical Section sectio. ~imu{h; ~.975' (True No~h)
Shared Services Drilling
Well :P2-08 (M,) WP$
DrillQuesf
,.
Target Name: TVDr-,u:
P2-M TARGET 8991,00
· ~
Proposal Target Summary ,.
TVDrkb: W¢lhead Offsets: Global Coordinat~:
9039.80 9476,1 t N, 9524.27 E 6008300,00 lq, 690000,00 E
SURFACE LOCATION
I Horlzon~al Coordinates: .~69~i.50 N. 681306,46 ~
RK5 Elevation: a7.~tl.80 I11 Well (~17~
48~0 Il RKB-~=L
NAO~ AI~S~ 8~t0 Pbn~,
Coerdln~o Syetem:
~" I -I PcoTCr"~t~"cn"ok~aDATEsy"~'~::, 6/11/981,~~~(
10000
8000
6000
2000
0
Scale: linch -- 200Oft Eastlngs
, .
1
Tolal DOp[h: 17418,5311 MD,
0500.
. ~ ._~
'~. ~BHA Tendency ~ 0.144¥100n: 8555.96. MD, 5200.00, TVD
~. ~ ~ 95/8" Ca~ing
'~ 7961.57 MD-
/ 4948~0 WD
3000,
i
~ ta ~r ~ 1 t ~ ~ D
~OP: Sl~ ~tf ~ ~.0~=/lOOfl ~ ~nll MD. 400 g~ ~D
- I I } .... I I
0 2000 4000 6000 O000 10000
Scale; qinch '" 2000ft Eastings Reference Is True North
'10000
8000
6000
4OOO
2000
Sperry-Sun Drilling Services
Proposal Report for P2-08 (M) WP3
Shared Services Drilling
Point Mclntrye
Measured
Depth
(m
Incl. Azim.
Sub-Sea
Depth
(it)
Vertical
Depth
(it)
0.00 0.000 0.000 -48.80 0.00
100,00 0.ODO 0,000 51.20 100,00
200,00 0.00O 0.01~ 151.20 200.00
300.00 0.000 0.000 251.20 300.00
400.00 O.C4X) O,O<)O 351,20 400,00
500.00 1.000 20.000 45't.19 499.99
600.00 2.000 26.000 551.16 599.96
700.00 3.OC'0 20.(Ir.,0 651.06 699.86
800.00 4.000 20.000 750.88 799.68
900.00 5,500 20.000 850,53 899.33
1000.(],0 7.000 20.000 949.93 9~)8.73
1100.00 8.937 23.620 1048.96 1097.76
II54.35 10.00~ 25.000 1102.57 1151.37
1200,00 10.913 25.000 1147.46 1196.26
1300.00 12.913 25.000 1245.30 1294.10
1400.00 14.913 25,000 1:342.36 1391 .'16
1500,00 16.913 25J30~) 1438.5.3 1487.33
1 l~00.0O 18,913 25.000 1533.68 1582.48
1700.00 20.913 25.000 1627.69 1676.49
1704,35 21.000 25.000 1631.75 1680.55
1800.00 21 .(]O0 25,000 1721.05 1769,85
1814,94 21.009 25.000 1735.00 1783.80
1900.00 21.000 25.000 1814,4't 1863.21
2000.00 21.0{X) 25,000 i 907.77 1956.57
2030.46 21.00D 25,003 1936.20 1955.00
2100.00 22.797 27.846 2000.73 2049.53
2200.00 25.454. 31.258 2091.99 :2140.79
23d0,0~3 28.176 34.057 2181,23 2230.03
2400.00 30.946 36.396 2268.21 2317.01
2500.00 33.751 38,384 2352.68 2401
-._.
Local Coordinates
Northings Eas~ings
(ft) (ft)
0.00 N 0,00 E
0.00 N O.O0 E
0,00 N 0.00 E
0.00 N 0.~3 E
0.00 N 0.00 E
0.82 N 0.30 E.
3.28 N 1.19 E
7.36 N 2.69 E
13.12 N 4,77 E
20.90 N 7.61 E
31.13 N 11.33 E
43.97 N 16.53 E
52,11 N 20,21 E
59.62 N 23,71 F__
78.33 N 32.44 E
100.12 N 42.60 E
124.97 N 54.18 E
152.84 N 67.18 E
183,71 N 81.58 E
185.12 N 82.23 E
216.19 N 96,72 E
221.04 N 96.98 E
248.67 N 11I.E~7 E
281.15 N 127.01 E
291.04 N 131.62 E
814.25 N 143.18 E
349.76 N 163.39 E
367.69 N 187.77 E
427.96 N 216.25 E
470.44 lq 248.76 E
Global Coordinates Dogleg Vertical
Northings Eastings Rate Section
(fi) (fi) (°,00~t) (ft)
5998595.59 N 681306.46 E 0.00
5996595.59 N 681308.46 E O,0OD 0.00
5998595,59 N 681308.46 E 0.000 o,00
5998595.59 N 651308,46 E 0,0,0,0 O.00
5998595.59 N 661308.46 E 0.000
5998596.42 N 681301].74 E 1,000 0.79
5991~598.90 N 681909.57 E 1.000 3,16
5998603.03 N 681310.97 E 1.000 7,12
5998608.82 N 661312.91 E 1,000 12.65
5996616.66 N 661315.56 E 1.500 20.16
599862:6.98 N 61M319.03 E 1,500 30.03
5998639.95 N 681323.91 E 2.000 42.79
5998648.18 N 681327,40 E 2,000 51.15
5995655.77 N 681330.72 E 2.000 58,94
.5998674,69 N 681338.99 E 2.000 78.34
5998696.72 N 681348.62 E 2.000 ~00,94
5998721.84 N 681359.60 E 2.000 126.70
5998750.02 N 651371.91 E 2,000 155.61
599876'1,.23 N 68'[385.55 E 2.000 187.62
5998782,65 N 681386.18 E 2.000 169.08
5998814.06 N 61~1399.91 E 0.000 221.30
5998618.97 N 681402.05 E 0.000 226.:33
5998846.90 N 681414,2:6 E 0,000 254,91~
5998679.74 N 68'[428.61 E 0,000 288.66
5998889,74 N 681432.98 E 0,000 298.92
599R913.22 N 681443.98 E 3.000 323.5I
5998,949,21 N 681463.31 E 3,000 362,90
5998987.73 N 66141~6.76 E 3.000 406,97
599~)028.67 N 681514.26 E 3.009 455.59
5999071,93 N 681545,74 E :3.000 508,6:2
Alaska State Plane Zone 4
Point Mclntyre Pad 2
Comment
KOP: Staff Dir {~ 1.00O°llO0ft: 400.00ft MD, 40O.001t 'i'VD
Stad DIr @ 1.500"/100[t: 800.00tt MD, T99.68ft 'rVD
Start DIr @ 2.000"1100R: 1000,00It MD, 996.73ff TVD
Start DIT @ 2.000"ll00tt: 1154.35ft MD, 1151.37ft TVD
End D[r, Sail @ 21.000": 1704.3511 MD, 1680.55ft 'I'VE>
]~ASE PERMAFROST
S't~,rt Dir @ 3.O00*/100ft; 2030.46[t MD, lgBs,G0[t 'FVD
Con~u~...
~ ~ - DrflfQues~
Sperry-Sun Drilling Services
Proposal Report for P2-08 (M) WP3
Shared Services Drilling
Point Mclntrye
Measured
Depth
(fl)
Incl. Az[m.
Sub-Sea
Depth
(fl)
Vertical Local Coordinates
Depth Northtngs Eastings
Ct) (fl) (fl)
2600.00 36.58z~ 40.0~F3 2434.42 2`483.22
2700.00 39.439 41.599 2513.?.0 2562.0~
2800.00 42,310 42.927 2588.8~ 2637, 61
201~,00 45.195 44.117 2661.04- 2709.84
3000.00 48.092 45,192 27?_9,69 2778.49
3100.00 50.997 46.17ZJ 2794.57 2843.37
3200.00 53,910 47.07B 2855.50 2904.30
3300.G0 56.830 47.918 2912,32 2961.12
3400.00 59.754 48,703 2964,BB 3013.68
3500.00 62.684 49.443 30I 3.02 3061, B2
3.578.99 65.O00 50.000 304-7.84 3~)96.64-
3B0O.O0 65.000 59.~00 3056.72 3l 05.52
3700.00 65.000 50,000 3098.98 3147.78;
3800.00 65,000 50.O0D 3141.24 3190.04
3900,00 65.000 50.000 3183,50 3232.30
4 0O0.0O 65.000 50.000 3225.77 3274,57
4100.00 65.000 50.000 3268.03 3316.83
4.200.00 65.000 50.000 3310.29 3359.09
4,~00,00 65.000 50.000 3352.55 3401.35
4`400,C~3 65.000 5O,0OO 3394.81 3443,61
4500.00 65.0-0'0 50.000 3437.08 C'-N85.86
4600.00 65,000 50.000 3479.34 3528.14
4700,00 65.000 50,000 3521.60 3570,40
4800.00 65.000 50~000 3563.86 3612.66
4900.00 65.000 50.000 3606.12 36..~.92
5000.00 65.000 50.000 3648,3~ 3697.18
5100,0(3 65.000 50.0(X3 3690.65 3739.45
5200.00 65.000 50.000 3732.91 3761.71
5300.00 65.000 50.000 3775,17 3623.97
5400.00 65,000 20.000 3B17.43 3866,23
515.02 N 285,22 E
561.58 N 325.5l E
609.98 N 369.53 E
660.11 N 417.16 E
711.81 N 468,26 E
764.96 N 52_2.71 E
819.39 N 580.34 E
874,97 N 641 .OD E
9~1.54 N 704.53 E
988.94 N 770.75 E
1034.77 N 824.84 E
1047.01 N 839.43 E
1105.27 N 908.85 £
1163.52 N 978.26 E
1221.76 N 104,7.71 E
t 280.0¢ N 1117.13 £
1338.29 N 1186.66 E
1396.55 N 1255.99 E
1454.61 N 1325.42 E
I513.06 N 1394.84 E
1571.32 N I464.2_7 E
1F:~9.57 N 1533.70 E
1615'7.83 N 1603.13 E
1746.09 N 1672.55 E
1804.34 N 1741.98 E
1862.60 N 1811.41 E
1920.86 N 1680.83 E
1979.11 N 1950.26 E
2037.37 N 2019.69 E
2095.63 N 2089.12 E
Global Coordinates Dogleg Vertical
No,things Easti ng s R ate Section
(fl) (ft) (°ll00ft)
5999117.38 N 661581.09 E 3.000 565.92:
5999164.90 N 68162.0,24 E 3.000 627.34
5999214.36 N 681663.08 E 3.000 692.69
5999265.63 N 681709.48 E 3.000 761.82
5999318,56 N 681759,31 E 3.000 834.51
5999373.00 N 661812.45 E 3,000 91,0.59
5999428.82 N 681868.75 £ 3.OOO 989.83
5999485.85 N 681928,05 E 3.000 1072.03
599'9543.95 N 681990.18 E 3,060 1156.95
5999602.94 N 662054.99 E 3.000 1244.36
5999650.07 N 682107.95 E 3.000 1315.01
5990662.66 N 682122.23 E 0,000 1333.98
5999722.58 N 682190.23 E O.0OO 1424.:26
5999782,51 N 682258.22 E 0.000 1514.54-
5999842.43 N 682326.21 E 0,090 1604.8;2
5999902.36 N 682394.21 E 0.000 1695.11
5999962,28 N 682462,20 E 0.000 1785.39
6000022-20 N 682530.~9 E O.O0O 1875.67
6(H~'082.'t3 Iq 662598.19 E 0.000 1965.95
6000142.05 N 682666.18 E 0.000 2056.24
6000201.97 N 682734.I7 E O.0D0 2146.52
6~00261.90 Iq 682802.17 E 0.000 2236.80
6000321.82 N 682870,16 E 0.000 2327.08
6000381,75 N 682-e~3,B.15 E 0,0DI) 2417.37
6000441.67 N 683006.15 E O.000 2507.65
G000501.59 N 683074,14 E 0.000 2597.93
6000561.52 N 6831,42.13 E 0,O00 2686,21
6000621.4~ N 663210.13 £ 0.O00 2778.50
600068~[.36 N 683278.12 E 0.0go 2668.78
6000741,29 N 68C-'~34 6.1 '1. E O,OOD 2959.06
Alaska Stale Plane Zone 4
Point Mclntyre Pad 2
Comment
End Dir, S~I @ 65.000°: 3578.99ft MD, 3096.64[t TVD
Conb'nued, ,,
- 2. Drl#Quest
Shared Services Drilling
Point Mclntrye
M easu red
Depth
IncL Az[m,
Sub-Sea
Depth
Vertical
Depth
(m
5500.00 65.00'0 51).00t) 3859.69 3908.49
5600.00 65.000 50.000 3901,96 3950.76
5700.00 65.000 50,000 3944.22 3993.02
5B0O.0O 65.000 50,C,0,0 3986.48 4035.28
5900.00 65.000 50.000 4028.74 4077.54
64300,00 65.000 50.000 4071.00 4119,80
6100,00 65.000 50.O[X) 4113.26 4162.06
6200.00 65.000 50.000 4155.53 4204.33
6300.00 65.000 50.000 4197.79 4246.59
6400.00 65.000 50.W30 4240.05 4288.65
6500.00 65.0 D0 50.000 4282,31 433~ .11
6600.00 65.000 50.000 4324.57 4373,37
6700,00 65.000 50.000 4366.84- 4415.64
6800.00 65.~ 50.000 4409.10 4457.90
6900.00 65.000 50.000 4451.36 4500.16
7000.00 65.000 50.000 4493.62 4542.42
7100.O0 65,04)0 50.000 4535.88 4.584.68
7200.00 55.000 50.000 4578.15 4626.95
7300.00 65.000 50.000 4620.4't 4669.21
7400,00 65.000 50.000 4662.67 4-711.47
7500.00 65.000 50.000 4704,93 4753.73
751,2.00 65.000 50.000 4710.00 4758.80
7600.00 65.000 50,(K)0 4747.19 47:95.99
77~0.00 65.O00 51).001} 4789.4.5 4 838.25
7800.00 65.000 50.000 4831.72 4880.52:
7900.00 65.000 50,000 467'3.98 4.92.,2.78
7961.57 65,060 50.000 4900.00 4948.80
8000.00 65.000 50.000 4916,24 4965,04
81. 00.00 65.000 50.000 4.958.50 5007.30
8200.00 65.000 50,000 5000.76 5049.56
Sperry-Sun Drilling Services
Proposal Report for P2-08 (M) WP3
Local Coordinates Global Coordinates Dogleg Vertical
N orthings Eastings N orthl ngs Easting s Rate Section
(fi) (fi) (ft) (ft) ("/100ft)
2153.88 N 2158.54 E 601){~01.21 N 683410.11 E 0.000 3949.34-
2212.14 N 2227,97 E 6000861.14 N 683482.10 E 0.01~ 3139.63
2270.39 N 2297.40 E 6000921.06 N 683550.09 E O.000 3229.9't
2326.65 N 2366.82 E 6004980,98 N 663618.09 E 0.000 3320.19
2386.91 N 2436.25 E 6001040.91 N 683686,08 E O,000 34`[0.47
2445,16 N 2505.68 E 60~1100.83 N 683754.07 E 0.000 3500.76
2503.42 N 2575.11 E 6001160.75 N 663822.07 E 0,680 3591.04
256`[.68 N 2644.53 E 6001220.68 N 683890.06 E 0.000 3681
2619.93 N 2713.96 E 6001280.60 N 683958.05 F_. 0.000 3771.60
2678.19 N 2763.39 E 60~1349.53 N 684026.05 E 0.080 3861.89
2736.45 N 2852.82 E 6001~400.45 N 684094.04 E 0.000 3952.`[7
2794.70 N 29¢_2..24- E 6001460,37 N 684'[62.03 E 0.000 4042.45
2852.96 N 2991.67 E 6001520.30 N 684230.03 E O.O0O 4132.73
2911.2I N 3061.10 E 6001,580.2_2 N 664298.02 F_. 0.000 47_23.02
2969.47 N 3130.52 E 6001640.14 !'4 684366.01 E 0.000 43`[3.30
3027.73 N 3`[99.95 E 6001700.07 N 684434.0`[ E O.0D0 4403.58
3085.98 N 3269.36 E 6001759.99 N 60,4502.00 E 0.000 4493.86
3144.24 N 3338.81 F_ 6001819.92 N 684569,99 E 0,~00 4584.15
3202,50 N 3408,23 E 6001879.84 N 684637.98 E 0.000 4674.43
3260-75 N 3477,66 E 6001939.76 N 684705.98 E 0.000 4764.71
3319.01 N 3547.09 E 6001999.69 N 884773,97 E 0,O00 4854.99
3,326,00 N 3555,42 E 60020.06.87 N 684762.13 F_ 0.000 4865.82
3377.2__6 N 3616.51 E 6002059.61 N 664841.96 E 0.00O 4945.27
3435.52 N 368;5.94 E 6002119,53 N 684909,96 E 0,01:)0 5035.56
3493.78 N 3755.37 E 6002179,.46 N 684977.95 E 0.000 5125.84
3552.03 N 3824.80 E 6002239.38 N 66504.5.94 E 0.000 5216.12
3587.90 N 3867.54. E 6002276,28 N 685067.81 E 0.0O0 5271 .'7'1
3610.29 N 3894.22 E 6002.299.3'[ N 6851 I3.94 E 0.00O 5306.40
3668.55 N 3963.65 E 6002359.23 N 685181,93 E 0,000 5396.69
3726.80 N 4033.08 E 60024.19.15 N 685249.92 E 0.000 5466.97
Comment
T-3 (sv-i)
9 5/8' Casing
Alaska State Plane Zone 4
Point .M. clntyre Pad 2
Continued,.,
DrillCtuest
Shared Services Drilling
Point Mclntrye
Measured
Depth
(ft)
Incl. Azim.
Sub-Sea
Depth
Vertical
Depth
8300.00 6.5.000 50.000 5043.03 5091.83
8400.00 65.000 50.000 5085.29 5134,09
~500.C~;3 65.000 50.000 5127.55 5176.35
8529.46 65.000 50.000 5140.00 5188.80
8555.96 65.0 O0 50.000 5151.20 5200 ,OD
B6DO.OO 64.981 49.933 5169.82 5218.62
8'7'00.00 64.938 49.782 5:212,14 5260.94
8800.00 64.89~4 49.630 5254.54 5303.34
8900,00 64.851 49.470 5297.00 5345.80
9000.01) 64-.808 49.326 5339.53 5388.3-3
9100.00 64,766 49.174 5382.'t3 54,30.93
92_00.00 64.723 49.022 5424.80 5473.60
9300.00 64-.681 48.869 5467, 53 5516.33
9400.00 64.639 48,717 55I 0.33 5559.'i 3
9500.00 64.596 48.564 5553.19 560'[.99
9600.00 64.555 48.412 5595.13 5644.93
9700.00 64,513 48,259 5639.12 568-/'.92
9800,00 64.471 4~.~ 06 5682, ;I 9 5730.99
9900~00 64.430 47.953 5725.32 5774.12
10000.00 64.380 47.800 5768.51 5817.31
101~0.00 64.347 47.647 5811.77 5860.57
10200.00 64.306 47.494 5855.10 5903.90
10300.00 64,20.5 47.340 5898.48 5947.28
10400.00 64.225 47.187 594.1,94 5990,74
10500.00 64.184- 47.033 5985.45 6034.25
10600.00 64.144 46,800 6029.03 6077.83
10700.00 64.104 46;.726 6072,67 6121.47
10000.00 64.064 46.572 61.16.3§ 6165.18
109DO.OD 64.024 46,418 6160.15 6208.95
11000.00 63,984 46.264 6203.98 6252.78
Sperry-Sun Drilling Services
Proposal Report for P2-08 (M) WP3
Alaska State Plane Zone 4
Point Mclntyre Pad 2
Local co~'r-dinates Gtobal Coordinates Dogleg Vertical
Northin gs Easti ngs. Nort h[ngs Easti ngs Rate Secti on
(ft) (fi) (fi) (ft) ("/lOOft)
3785.06 N 4102,50 E 6002479.08 N 665317.9'2 E 0,000 5577.25
3B43,:32_. N 4.171.93 I= 6002539.00 N 685365.91 E 0.000 5667.53
3901.57 N 4241.36 E 6002596.9'2 N 685453.90 E 0.000 5757.62
3918.74. N 4261.81 E 6002616.58 N 6854-73,94 E 0,090 5784-.42
3934.17 N 4260.21 E 6002632.46 N 685-491.96 E 0.0O0 5808,34
3959.84 N 4310_77 E 6002658.86 N 665521.88 E 0.144. 5848.10
4018.25 N 4380.03 F__ 6002718.94- N 68551~9.70 E 0.'t44 5938.37
4076.83 N 4449.11 E 60027'79.17 N 685657.34 E 0,144 6028.63
4135.56 N 4518,01 E 6002839.56 N 685724.79 E 0.144 6118.88
4194.46 N 4586.73 F_.. 6~)02900.10 N 685792.06 E 0:[44 6209.11
4253.51 N 4655,27 E 6002960.00 N 685859,15 IE 0.144- 6299.33
4312.73 bi 4723.62 E 6003021,66 N 685926.05 E 0.'[44 6389.54
4372.11 N 4791..80 E 6003§82.68 N 685992.77 E 0.144 6479.73
443~.65 N 4859.80 E 6003143.85 N 686059.30 E 0.144 6569.91
4491.35 N 4927.6I E 6003205.18 N 686125.64 E 0.144 6660.07
4551.21 N 4995.24 E 6003266.66 N 666191.150 E 0.144 6750,22
4611.22 N 5062.68 E 6003328.30 N 686257.77 E 0.144 6840.35
4671.40 N 5129.95 F- 600.3390,09 N 686323.55 E 0,144- 6930.46
4731.74 N 5197.03 E 6003452.03 N 686359.l 5 E 0.144 7020.55
4792.23 N 5263.92 E 6003514.~ 3 N 686454.55 F__ 0.144 7110.63
4052,81~ N 5.330.63 E 6003576.30 N 606519.77 E 0.144 7200.68
4913.69 N 5397,15 E 6003638.79 N 686584.80 E 0.144 7290.72
4974.65 N 5463.49 F_. 6003701.34-N 606649.64 E 0,144 7380.73
5005.77 N 5529.64 E 6003764.05 N 686714.29 E 0.144 7470.73
5097.05 N 5595.61 E 6003826.9'[ N 6867'78.75 E 0.144 7560.70
5158.48 N 566'1..39 E 600:3809.9Z N 686843,02 E 0.144 76.50.65
5:22.0.07 N 5726.98 E 6003953.08 N 686907.I0 E 0.144 7'740.58
520'[.81. N 5792.38 E 6004016.39 N co86970,9B E 0,144 783(3.48
5343.71 N 5857.60 E 6004079.85 N 687034.68 E 0.144 7920.36
5405.76 N 5922.62 E 6004143.47 N 687098.18 E 0.144 8010.2__2.
Comment
K-15
BHA Te~tdertcy @ 0.'t44°/100ft: 8555-96ff MD, 5200.C,0ftTVD
Gon~nued...
Driil(3uest
Sperry-Sun Drilling Services
Proposal Report for P2-08 (M) WP3
Shared Services Drilling
Point Mclntrye
Measured
Depth
Incl. Azim.
Sub-Sea Vertical Local Coo¢~instes
Depth Depth N orth[ngs Easti ngs
(~t) (ft) (lq
11100.00 63.945 46.110 6247.87 6296.67
11200.O0 63.905 45.955 6291.83 6340.63
11300.00 63,866 45.8t) 1 6335,84 6384.64
11400.00 63.827 45.647 6379.92 6428.72
11500.00 63.788 45.492 6424.06 6472.86
11600.00 63.750 45,337 6468,26 6517.06
11700.80 63.711; 45.182 6512.52 6561.32
11600.00 63,673 45.02.7 6556.84 6605_64
I 1900.00 63.E64 44.572. 6601 ..22 6650.02
12000.0.0 63.596 4-4.717 6645.66 6694.46
12~[00.00 63.559 44.562 6690.16 6'2'35.96
1228'0.00 63.521 44.407 6784.71 6783.51
12300.00 63,483 44.25! 6779.33 6828.13
12400.00 63.446 44.096 6824.O1 687,?..81
12500.00 63.409 43.940 6868.74 6917.54
'[2600.00 63.372 43,78,4 6913.53 6962.33
12700,00 63.335 43.629 6958.38 7007.18
12600.00 63.298 43,473 7003.28 7052.08
12892.78 63.264 43,328 7045,00 7093.80
12900.00 63.262 43.317 7048.25 7097.05
13000.00 63.225 43.1 G0 7093,:27 7142.07
13100.00 63.189 43.004 7138.34 7187.14
13:2.00.00 63.153 42.848 7183.48 7232.28
~3300.00 63.117 42.691 7228,67 7277.47
13400,00 63.082 42.535 7273.9l 7322,71
13500.00 63.046 42,378 7319,21 7355.01
13600.00 6.3.011 42.222: 7364.56 7413.36
1378'0.00 62.976 42.065 7409.97 745 6.77
't 3800.00 62,941 41.908 7455,44 7504.24.
13900,00 62.906 41.751 7500.96 754.9.76
5467.97 N 5987.46 E
5530.33 N 6052.11 E
5592.84 N 6116.57 E
5655.50 N 6;180.E,4 E
5718.32 N 6244.91 E
5781.29 N 6308.80 E
5844,41 N 6372.49 F_
5907.68 N 6436.~ E
5971.10 N 6499.31 E
6034.67 N 6562.42 E
6098,39 N 6625.35 E
616:2,26 N 6688.08 E
6226.28 N 6750.62 E
6290,45 N 6812.96 E
6354.76 N 6875.11 E
6419,23 N 6937.06 E
6463.84 N 6998,82 E
6548.60 N 7060.38 E
6608,81 N 71. I7.32 E
6613~50 N 7121,75 E
6678,55 N 7I 82.92 E
6743.75 N 7243.89 E
6809.09 N 7304.66 E
6874,58 N 7365.24 E
6940.2.1 N 7425.62 E
7005.98 N 7485.80 E
7071.90 N 7545.78 E
7137.96 N 7605.56 E
7204,17 N 7665.14 E
7270.51 N 7724252 E
Global Coordinates Dogleg Vertical
Northi ngs Eastin~s Rste Section
(fl) (ft) (°nOOft) (fi)
6504207.23 N 687161.49 E 0.144 8100.05
6004271.14 N 687224.6,0 E 0.144 8'i89.86
600,4335.19 N 687287.52 E 0.144 8279.64
6004399.40 N 687350.25 E O.144 8369.39
6004463,75 N 68741:2.79 E 0.144 8459.12
6004528.25 N 667475.13 E 0.144 8548.82
6004592.90 N 687537.2'7 E 0.144 8638.49
6604657.69 N 687599.22 E 0,144 6728.13
6004722,63 N 687660,97 E 0.144 8817.75
6004787,71 N 687722.53 E 0.144 8907,33
6004852.94 N 687783,89 E 0.144 8996.66
6004918.31 N 687845.05 E 0.144 9066.40
6004983.83 N 687906.02 E 0.144 9175,69
6005049.49 N 687966.79 E 0.144 9265.35
6005115.30 N 688027.35 E 0.144 9354-.'77
6005181.25 N 688087.73 E 0.144 94d'!.16
6~052.47~4 N 688147.90 E 0,144 9533,52
6005313.57 N 688207.87 E 0.144 9622:.84
6005375.15 N 688263.33 E O, 144 9705.69
600,5379.~ N 688267.64 E 0.144 9712.13
6005446,46 N 688327.21 E 0,144 9801.38
600,,5513.12 N 688386.59 E 0.144 9890,60
6005579.91 N 688445.76 E 0.144 9979.78
6005646.85 N 688504,73 E 0.144 '[0068.92
6005713.93 N 688563.50 F__ 0,144 10158.02
6005781.14. N 686622,06 E 0.144 '[0247.09
6005648;.50 N 688680.43 £ 0.144 10336.11
6005915.99 N 6§8738.59 E 0.144 t0425.10
60'35983,62 N 688796,54 E 0.144 10514.05
600605'[.39 N 688854.30 E 0,144 10602.95
Comment
WEST SAK (SEISMIC TOP)
Alaska Slate Plane Zone 4
Point Mc|ntyre Pad 2
.~.
Cont. rnued...
Shared Services Drilling
Point Mclntrye
Measured
Depth
incl. Azim.
Sub-Sea
Depth
Vertical
Depth
14000.0{) 62.87'[ 41.594- 7546.53 7595,33
14100.00 62,837 4,1.436 7592.15 7640.95
14200.00 62.803 41.279 7637.83 7686.6,3
14300.00 62.769 41.122 7683.56 7732.36
14400.O0 62.735 40,964 7729.35 7"/78.'[ 5
14500.00 62.701 40.807 77'75.19 7823,99
14-600,00 62.667 40,649 7821.08 7869.88
14700~00 62.634 40.491 7867.02 791. 5.82
14800.00 62.501 40.333 7913.01 7961,81
14900,00 62.568 40.175 7959.05 8007.85
15000.00 62,535 40.017 8005,15 8053,9.5
15100.00 62.502 39.85,9 8051.30 8100.10
15200.09 62.470 39,701 8097.49 8146.29
15300.00 62.437 39.542 8143.74 8192.54
't 5400.00 62.405 39.384 8l 90.04 82:38.84
15500.00 62,373 39.225 8236.38 82.85.18
15600.00 62.3z~_ 39.067 8282.78 8331
15700,00 62.310 38.908 8329.22 8378.02
1580'9.00 62.279 38.749 8375.71 6424.51
15900.00 62__,247 38.590 8,42::2.25 8471.06
16000,00 62.21,6 38.431 8468.84 8517.64-
16100.00 62.186 38.272 8515,48 8564.28
16200.00 62,155 38.1 t3 8562.17 8610.97
16300.00 62.124 37.954 8608.90 B657.70
16400.00 62.094 37.794 8555,6.5 8704,48
16500.00 62,064 37.635 8702.50 8751..30
16600,00 62.034 37.475 8749.37 8798.17
16700.00 62.0rJ4' 37.316 879 6.:2'~ 8845.09
16800.00 61.975 37.156 8843.26 8892.06
16900,00 61.945 36.996 8890,27 8939.07
Sperry-Sun Drilling Services
Proposal Report for P2-08 (M) WP3
Local Ceordin.a.t. es Global Coordinates Dogleg Vertical
NorthZn~s Easfings Northings Eastings Rate Section
(ft) (ft) (fi) (ft) (o/looft)
7337.00 N 7763.70 E 6006119.29 N 688911.85 E 0.144 10691
7403,63N 7842,68 E 6006187.33 N 688969.20E 0.144- 10780.64
7470.40 N 7901.46 E 6006255,51 N 689026.34 E 0.144 10869.42
7537.31 N 7960.04 E 6006323.63 N 689063,28 E 0.144 10958.16
7604,37 N 8018.42 E 6006392.27 N 669140.O1 E 0.144 11046.85
7671.56 N 8076.59 E 6006460.85 N 689196.53 E 0.144 1,1135.50
7738.89 N 8134.56 E 6006529.58 N 659252.85 E 0.144 11224.10
7806.36 N 8192:.33 F_. 64306596.43 N 689308,97 E 0.144 11312.66
7873.97 N 8249.89 E 60066b-"7.41 N 689384.87 E 0~144 't1401.1,8
7941.72 N 6307,25 E 6006736.53 N 689420.57 E 0.1,44 11489.65
6009.60 N 8364.41 E 6006805.79 N 689476.07 E 0,144 11578,07
8077.62 N 8421.36 E 6006875.'t7 N 689531.35 E 0.1;44 11666,44
8145,78 N 8476.1,1 E 6006944,69 N 689586.43 E 0.144 11754.76
8;214.08 N 8534.65 E 6007014.33 N 6~9641.30 E 0.144 11843.04-
8282,51 N 8590,99 E 6007084.11 N 689695,96 E 0.144 11931'27
8351.08 N 8F:~47.12 E 6007154.02 N 689750.41 E 0.144 12019.45
8419.78 N 8703.O4 E 6007224.06 bi 689804,65 E 0.144 12107.58;
8488,62 N 8758.76 F_. 6007294.23 N 689858.68 E 0,144 12195.65
8557.59 N 8814.27 E 6007364.52 N 68,9912.50 E 0.144 12283.68
8626.69 N 8869,57 E 6007434.95 N 689966.ll E 0.t44 12371.65
8595.93 N 8924.67 E 6007505.50 N 690019o51 E 0.144 12459.57
8765.30 N 6979,56 E 6007576.19 N 690072.69 E 0,144 12547.44-
8834,80 N 9034.~¢ E 6007647,06 N 690125.67 E 0.144 12635.26
8904.44 N 9068.71 E 6007717.93 N 690178.44 E 0.144 12723.02
8974.21 N 9142.97 E 6007789.00 N 690230.99 E 0.144 i2810.72
9044.10 N 9197.02 E 60078,60.19 N 690283,33 E 0.144 12896.37
9114.13 N 9250,86 E 6007931.50 hi 690335.46 E 0.144- 12985.97
9184.29 N 9304.49 E 6008002.94, N 690387.37 E 0.144 13073.51
9254.58 N 9357.91 E 6008074.51 N 690439,07 E 0.144 13160.99
9325.00 N 9411.13 E 6008146,19 N 690490.56 E 0.144. 13248.4,1
Comment
Alaska State Plane Zone 4
Point Mclntyre Pad 2
.:.
Sperry-Sun Drilling Services
Proposal Report for P2-08 (M) WP3
Shared Services Drilling
Point Mcinlrye
Measured Sub-Sea Vertical Local Coordinates
Depth incl. Azim. Depth Depth Northi n gs l~Stings
Ct) (~t) (fi) (ft) (ft)
Globat Coordinates Dogleg Vertical
Northings Eastin§s Rate Section
(ft) (fi) (°/lOOfl) (it)
16978.0,8 61.922 36.671 8927.o0 8975.8o 9360.07 N 9452.52 E.
17000.00 61.9~J6 36.8:36 8937.32 8986.12 9395.55 N 9464.13 E
1706:3.03 61.698 36.735 6967.00 91)15.80 9440.08 N 9497.42 E
17100.00 61.887 36.676 6984.42 9033.22 9466.22 N 9516.91 E
17105.48 61.885 36.667 8967.00 9035.80 9470.10 N 9519.80 E
17113.97 61.663 36.654 8991.00 9039.80 9476.11 N 9524.27 E
60{38202.25 N 6905313.61 E 0.144 13316.63
6008218.01 N 69054'[.83 E 0.144 13335.78
6008263.33 N 690574.03 E 0.144 13390.62
600821~9.94 N 6.90592.89 E 0.144 13423.09
60~8293.89 N 690595.68 E 0.144 13427.87
6Q0830D.OO N 6,90-60D.00 E 0,144 13435.28
17200.00 61.86:3 36.530 9031.56 9080,36 9537.02 N 9569.50 E
17:278.53 61.846 36.417 9068.60 9117,40 9592:.70 N 9610.66 E
17300.00 6~.841 36,366 9078.73 9l:27.53 9607.94 N 9621,89 E
17400,~ 61.816 36.:242 9125.94 9174.74 9678,98 N 9674.10 E
17416.53 61.814 36.215 9134.69 9183.49 9692.15 N 9683,75 E
6008362.00 N 69064,,3~7'4 E 0.129 13510.34
6008418.66 N 690663.53 E 04129 13578.82
601)6434.17 N 690694.40 E 0.129 13597.54
6130:3506,44 N 690744.85 E 0.129 13684.69
60G6519.85 N 690754.~9 F__ 0.129 I370{).83
Ail data is in feet unless otherwise stated. Direclions and coordinates are re[ative to True North.
Vedical depths are relative to Well Reference. Norlhings and Eastings are relative to Well Reference.
The Dogleg Severity is in Degrees per 100ft.
Vertical Section is from We[[ Reference and calculated along an Azimuth of 44.975° (True).
Based upon Minimum Curvature type calculations, at a Measured Depth o[ 17418.53ft,,
The Bottom Hole Displacement is 13700.83ft., in the Direction of 44,975° (True}.
Comment
Alaska State Plane Zone 4
Point Mclntyre Pad 2
K-lO
HRZ
KALUB]~(
~HA Tendency @ 0.129°/100ft· 17113.97[t MD, 9039.801tTVD
TKUP
Targel_' P2-(M)TARGET, 21)0.0O Radius., Geo]oglc~[
Tota! Deplh: 17418.53ft MD, 9183.4.gfITVD
7' C~sin~g
June. 1998 - I6:I7 - 7- D£i#Q~rest
JUN-I 1-98 THU 04:26 PN
SP 'RRY-SUN
NO, '"75835754
P, ll
5631 Silverado Way #G
Anchorage, Alaska 99518
(gO'T) 563-32ff6 Fax (907) 563-7252
Shared Services Drilling
Grog Hobbs
Approved Well Close Approach Review
P2-08(M) wp 3
Or, g,
Thc ahovo mcnLioneA well has been scumu~d ming ,~ huldard unfi-~ili.~ioil In~thod.~ via DEAP.
i · _ i i -- . i - t
was per~orraed with lite following parameters:
Start Scan lalspeu~on Zone
Stav~h~g Scan lladltu~
Pate or Pa,dim lncrea~ (t~, loo0')
Anli-Gollisimt Stmn stumnnry:
3%00'
= _.. 17,418,53'
200.00'
100.00'
A~th¢ pla,mcA KOP thu gta.,'ttng Scm Radius is 98.15' la¢gerflmrt DEAP'~ dRfault {e~gs of 100' 8u~ S~n kadh~s ~casin8 at 50'
per 1000 ~ f~ a n~w.~tl wul{ ~, a~ DEAF~ dofiauJt~ would bo c~al to 101.aS' at the S~ Sc~ I~¢cfion ~nc ~ stated above.
Tlicse umub~ sro used to prod~c a final ~cm radius of 193&lSY which is 967,2265' I;¢8cr ~an DEAFs ~fault value of 970,9265'
Stun Parame~rs Commen~{
i -- i · i mil --__ _ -
-- i __ --
_ l__. 1__ . i --
At this eul,'u'g ed ra(lju~ the following wclks were tlele, et~[ dtlring ~e .5~ (Bx~ on clo~m'Allowablo ~ion t, om PI~3:
Note: ~ list may n~ include MI thc wel~ da~tM, only fllose of whi~ ~o of uoiIccm or Inly effem Tolerance
P2-09 599.97 'i~ID
P2-to 5024 2 'MD
PR-iR 2263.99 'MD
P2-13 1401.74 ~D .
P2-15 3465,g9 '~
30&8'
16.23
Id,iS
32,89 '
72,81
83,23
132,23
90.29
90.~9
55,62
_
298,10 · 25.37
126,40 * 10.4~
116,50 · 27.93
235.50 " 50.39
L65'30 "' -- 31.04
NO
,YEs TO S_SSV 2000'
__
?sro_sss. v..~ooo,. _ , _ .
~ TO ssSv ~_o_oo,
,s~ TO sssv ;tooo,
Y~S TO 4000"
YES TO SSSV 2000'
343.20 " 72,97 YFsS TO 4000"
P2~22 2619.02 ~MI.) 4.20 ~' 65.5d YF~ TO 4000"
P2~2PBI 2619.02 'MD 4,20 * O~.Sd ~ TO 4~0"
_
_ ~
MAJOP
MINOR
MINOr?
MINOR
MINOR
MiNOf~
MINOP
MINOI~
MINOr~
Tolerance Plot required:
YES
__
Close Approach Comments:
,.A. ~B,%O_V,E W. Et,LS MUST BE SHU'fdN TO DRILL P2.O6 WP3
Clo~ Approach Scan Performed by:
Checked by;
-- __
Approved by:
Date:
Date:
I Well Name: I P2-08
I Type of Well (producer or injector): I Injector
ISurface Location:
Target Location:
Bottom Hole
Location:
18'-FSL, 1073' FWL, T 12N, R 14E, S 11
4208' FSL, 50' FWL, T 12N, R 15E, S 6
4424' FSL, 209' FWL, T 12N, R 15E, S 6
[AFENumber: 12B0221
Estimated Start 7/5/98
Date:
1Rig: I NABORS 33E
Days to complete
27
IMD: 117419' I ITVD: 19183' I IRTE: 149.0
IWell Design (conventional, slimhole, etc.): Ultra-Slimhole 7" Longstring, 4-1/2" L-80
tbg _ .. ,
Formation Markers: ---~ ;-- ~-` ~*- '-'" ~
Formation Tops MD TVD
Base of 1815 1784
SVl (T3) 7512 4759
9 5/8" Casing 7962 4949 9-5/8" csg shoe below SVl & above
Point K-15
K15 (Ugnu) 8529 5189
West Sak 12893 7094 9.5 ppg minimum mud weight
required.
K-10 16978 8976 9.6-9.9 EMW to this depth. 3% 10.3
ppg KCl GEM System at 500' ABOVE
K-10.
HRZ 17063 9016 K-5/HRZ same depth. 10.5 ppg at 60
degree angle plus recommended.
Kalubik 17105 9036
Ku paruk 17114 9040
OWC 17279 9117
TD 17419 9183 7" casing shoe. 140' MD below OWC.
10.6 ppg IF Miluveach is penetrated.
Casing/Tubing Pro(, ram:
Hole Cs[~/Tbg Wt/Ft Grade Conn Length Top Btm
Size O.D. MD/TVD MD/TVD
30" 20" 133# H40 BTC 80' 49/49' 129 '/129'
12 1/4" 9 5/8" 40# L-80 BTC-Mod 7914' 48/48' 7962'/4949'
8 3/4" 7" 26# L-80 BTCM 17372' 47/47' .17419'/9183'
Tubing 4 1/2" 12.6# L-80 BTCM 16968' 46'/46' 17014'/8922'
Mud Program:
Surface Mud
Density (ppg)
8.7-9.5
112 1/4" hole section
Properties:
Spud
FunnelVis I Yield Point 10 sec gel ll0 min gelI
100-300 30-70 20-60 40-80
pH
9-10
Fluid Loss
15 - 25cc
Production Mud Properties: LSND 18 3/4" hole section
Density (ppg) Funnel Vis Yield Point I 10 sec gel 10 min gel
8.8-9.9 40-55 18-22I 5-15 < 30
Production Mud Properties: 3% KCL J 8-3/4" hole section, GEM
Density (ppg) Plastic Vis Yield Point 10 sec 10 min
gel gel
10.3-10.6 8-15 15-25 8-15 < 30
pH
9.0-9.5
pH
9.0-9.5
Fluid Loss
4-6cc
Fluid Loss
<5cc
Cement Data:
Casing First Stage: Second Stage: Comments
Sxs/Wt/Yield Sxs/Wt/Yield
9-5/8" surfaceColdset II1: 1028/12.2/1.92 Two stage job'
casing 1000/12.2/1.92 (assumes 200% First stage Coldset III lead
to 7962'. excess in from 2100'-6188' @ 50%
ES cementer Class G' permafrost) excess followed by Class
@ at 2100' 754/15.8/1.15 G tail from shoe to 6188'
MD. (750' TVD) @ 50% excess
+ 80' shoe.
Second stage Coldset III
circulated to surface.
-~ .k WW WWW '~ 'k .k W W W .k W ~r .k .k W '/~ W ~ .k W W W .k¢r .k W W W W W W W W W W .k W .k W .k W W W .k .k W .k W .k WW W W.k .k W .k W .k .k.kW W 'k .k W W '/~ .k .k W W.k .k.kW .k WW .kWW WW .k.k.k .k W W .k.k WWWW .k.k 'kW 'kW .kW W W
Casing/Liner Lead:Sxs/Wt/Yield Tail:Sxs/W~ield Comments
7" none 261/15.8/1.19 Class "G". Volume based
on cement to 1000' above
the Kuparuk with 50%
excess + 80' shoe.
Logging Program:
I Open Hole Logs:
ICased Hole Logs:
12 1/4" MWD/multi-shots as directional survey.
MWD/LWD GR/RES to 500' above K-10.
MWD/LWD GR/RES/DEN/NEU (Triple Combo) to TD.
CBT-CET (Required/Injector). There is a possibility for a Gyro
also.
Well Control:
Well control equipment consisting of 5000 psi W.P. pipe rams, blind rams, and annular preventer
will be installed and is capable of handling maximum potential surface pressures.
It is requested that the diverter be waived for this well. The diverter would point at Manifold
buildings or other wells with the design of N-33E. There has never been any surface gas
reported in any of the PM-2 drilling programs.
BOPE and drilling fluid system schematics on file with AOGCC.
Directional'
KOP: 400' MD
Maximum Hole Angle:
Close Approach Wells:
65 degrees
P2-03 55.6' Allowable Deviation @ 802'
(Flowing)
P2-06 25.4' Allowable Deviation @ 497'
(S~)
P2-07 10.7' Allowable Deviation @ 602'
(S~)
P2-09 10.5' Allowable Deviation @ 600'
P2-10 27.9' Allowable Deviation @ 502'
P2-12 50.4' Allowable Deviation @ 2264'
(S~)
P2-13 31.1' Allowable Deviation @ 1402'
P2-15 73.0' Allowable Deviation @ 3466'
(S~)
P2-22 65.6' Allowable Deviation @ 2619'
(S~)
Drilling and Completion Scope
!. Move rig to P2-08. NU riser and flowlines.
2. Drill 12-1/4" surface hole to - 7962' MD.
3. Run and cement 9 5/8" casing. Cement to surface.
4. RIH with 8-3/4" bit, MWD DIR/GR RES to float collar.
5. PT casing to 3000 psi for 30 min. Record on chart.
6. Drill out 20', perform LOT. Record on chart
7. Drill 8-3/4" production hole with MWD DIR/GR RES to 500' MD above the K-10.
LWD Triple Combo and Bit. Swap to 10.3 PPG 3% KCI/GEM system.
8. Drill 8-3/4" production hole to 17,419' MD.
P. Run/cement 7" long string.
]0. Run 4-1/2" L-80 tubing with 7"x4-1/2" packer, 4-1/2" SSSV, and 2 4-1/2"xl" GLMs.
! !. Secure well, RDMO.
POOH for
Drilling Hazards/Contingencies
· The original reservoir pressure is 4377 psi at 8800' ss. The expected reservoir pressure is
4400 psi at 8800' ss. Abnormally pressured formations are not expected in this well. The
10.3 ppg mud will overbalance the anticipated pressure by 300 psi.
· Tight hole has been experienced in the lower Sagavanirktok, below the surface casing shoe
which were set into the SV4 sand. This has caused stuck pipe incidents and bit/BHA bailing
Gumbo problems.
· Coal stringers/SV Sands in the lower Ugnu have caused stuck pipe.
· No major instances of lost circulation problems have occurred on Pt Mac 2 wells.
Disposal
· Cuttings Handling: Cuttings should be hauled to the ball mill at CC-2A.
Fluid Handling: Haul all drilling and completion fluids and other Class II wastes to CC-2A for
injection. Haul all Class I wastes to Pad 3 for disposal. In addition, haul all cuttings from
drilling operations to CC-2A for disposal, except any metal cuttings which will be sent to the
North Slope Borough.
GH 06/15/98
P2 081
WELLHEAD: 11"X 11"-5M F~
.~ GL-SL = 12.8
: :~:~: ~:~:~ ::~:~:~ ~
Gen 5 Type ~
.......... ........ i:i.iiii.i~i.:i~:il 4-1/2"Ba'-O 12100
4000'- --
9-5/8", 40#/fi, L-80 7962' ,i
BTC 8.835" ID
'-' ~A~ LIFT MANDRELS
KOP: 400' ~
I MAX ANGLE: 65° @ 3579'MD ~ ,iiiim:~ (Camco 4-1/2x 1"
I ~ iii::r~:i !! N~ MD{BKB) 'I'VDss
I o~ I I tbd
i 4-1/2" 12.6# k-80 BIO TUBING
.....
TUBING ID: 3.958"
PEFIFOFIATION SUMMAFI¥:
I'[Size Intervalt b d SPF Open/Sqzd :::::
L-80 Mod BIC 6.276" ID
..............
ii i::~::!== 4-1/2" 'X' Nipple
!:::':::'J;:~ ~ 4-1/2" 'XN' Nipple
~ - 4-1/2" WLEG 17014'
MARKfiR dOl~'l' (20')
KUPAF1UK BUT BI:LOW ]-r.
DATE REV. BY COMMENTS ,Point Mclntyre
WELL: P2-08
06/15/98 GH PLANNED COMPLETION APl NO: 50-029-
Shared Sentices Drilling
JUN-II-98 THU 04:21 Pl"I SPERRY-SUN
FR× NO, 1°"75635754
P, 02
' sUi:IFACE LOCATION PLOT ~a~, ~ '
48 00 h R~ - A~L Che~ ~y ~
Proposal Da~ for P2-08 (~ ~3
Venial Origin t Walt Reference
NoAh R~m~; Trna No~~ ~.. ,
i
M~asuted ~cl, ~m, Ve~leal N~ln0a E~¢ Va~c~l D~leg I
D~pth Oap~
359~ ~ 65.~ 50,~ 3~6.~ t034.97 N B~.~4 ~ ]~tS.0l 3.~
17 t 13.~ 61.883 30.654 ~39,~J ~?O.l I N 95~7 ~ I ~'J~.28 0.
i~7~,53 61,~4~ 3~A17 91 t7.40 ~02 ~0 N ~t0.~0 ~ t35~8 82 0.12P i
i Proposal Target Summa
i Tatset Name' 'l~Dss: ~Drkb; Wcllh~d Ot'fscCs: Global Coordinates:
~-M TARGET 8091,~ 9039,80 9476. I 1 N, 9524,27
I
~OP: Staff DIr ~ 1,~0°/10~: 40O.~fl MD, ~O.00ff ~D
/8~ DIr ffi 1,500°/10~: 800,0~t MD, 799,68ft ~D
//,S~ Dir ~ 2.000"/100E: 1000,00ff MD, ~98.73ff TVD
[/ End DIr, Sail ~ 21.0~": 1704.~fl MD, t680,55~ WD
~28ta~ Dir ~ 3,000"/100E: 2o30.46~ MD, 198B,00ft TVD
~o, o0 X 7961.57 MD
..... ~HA ~ndency ~ 0,144 [100~: ~555.96R MD, 5~00.00fl TVD ' ' ·
~ Total Depth; ~ 7d~ ~.53fl MD, 9183
BHATeflden~ ~ 0,129/100fi: t7113,97fl MD,
9476.1I N~ 9.q24.27
~700 5400 aq O0 n OaOO t 3500
1lath = 2700~ V~[Ca[ Section s~tlo, ~imuth; ~975' (Tree No~h)
· . . ., ,. . _
JUN-II-98 ?HU 04:22 PM
SPERRY-SUN ~L~SK~ F~× NO, 1°~75835754 P, 03
~~l~'.~t~F1 ' ' Shared Services Drilling DrillQuesf
~~-~,~ Well :P2-0a (M) WP3
I
i Proposal Target Summa~
' Target Name: TVDr~: TVDrkb: Wellhead Off. ts: Global Coordinat~:
P2-M TAROET 8991,00 9039.80 9476,1 [ N, 9524.27 B 6008300,00 N, fig0000,00 E
SURFACE LOCATION .uoT O^Te:
Hol'lZ~l Coordinnla~,: s'~egfiOS,$9 N, 69130&46 ~. ' Cmlttafl By:
Rig
RKB £1evaflon: n?.~11 .~,0 lilt Welt (c~T~E')
48.80 It tn. KB - N~GL ! Cllecked By: "'
NADL~7 Alat:Y,a. $~to Pl,u~ea,
Coordinate Syatam: ~e 4 us ~oot -'
. . ,, ,~~ ~,
Scale; linch = 2000ffi Easflngs
,~ . 2~00 . 40100' . 60l~O' 80~00
10000 - ~o~¢n~ ~ t0000
1741 ~,~3 MD
To[al De~h: 17418,53[I MD, 91 ~,49{~ ~~~1
' ~2~ ~ 200' CIRCLE
~000 ~~ ~ ~476, ll N, ~24,27 E,-- ~000
,
6000 - 0~o.~ ~- 6000
_
~ ~ ~ 9 5/8" Ca~ing
~ 7961.57 MD
/ 49~,80 ~D '
3000,0 ~ ti
nd Olq Sail ~ 65.000": 3~8.99ff MD, 3096,64ff ~D
I Sta~ Dir ~ 2,0~/l~t: 1154,35~ MD, 1151,87~ ~D
, ,
~ ta~ ~r ~ I t t D D
,
] KOP .: ~d ~;f ~ t.O~"/100fl ! 4~ ~11 MD. 400 ~ ~.D_ '
I I ' I I I '
0 2o00 ~OO 6000 8000 1 o000
Scale; linch = 2000~ Eastings Re.fence Is True No~h
, . , ,,
I . . o,0o . ,o,0.0 ,, oo
-- 7"
1741 e,~;3 MD
Total De~h: 17418,53fl MD, 91 ~,49{i ~~91
~,4~
~D
BHA Te~d~y ~ 0A ~"/1~11:17~ 13.g7f~ MD, ~.~1 ~
82~ ~ ~ 200' CIRCLE
~ 6~0.
. XBHATenden~y ~ 0.144V100~' 8555.9~ MD, 5200,00~D
_
~ ~ ~ 9 5/8" Casing
.... ~ 7961.57 MD
4g~,80 WD
~°~nd Dlq Sail ~ 65.000": 3~8.99ff MD, 3096,64ff ~D
~'8~~~~&~, 1~8~00~ ~D
~~~70~, 1~&58 WD
, Sia~ Dir ~ 2,0~"/1~t: 1154,35~MD, 1151,87~ ~D .,
~ tee ir ~ I t ~ D D
I I ' I I I
Shared Services Drilling
Point Mcintrye
Measured
Depth
(ft)
Incl, Azim,
Sub-Sea
Depth
(ft)
Vertical
Depth
0~00 0.000 0.000 --48.80 0.00
100,00 O,OOO 0,000 51,20 100.00
200,00 0.00O 0.0OD 151.20 200.00
300.00 0.000 0.000 251.20 300.00
400.00 0.1;4)3 0.~0 351.20 400.00
500.00 1 .O00 20.000 451,19 4 99.99
600.00 2.000 20,000 551.16 599,:96
700.00 3.0L~ 20.0~3 651.06 699.55
690,00 4.000 20.000 750.88 799.68
900.00 5,500 20.000 850,53 899.33
1000.{~) 7.000 20.000 949.93 998.73
1100.00 8.937 23.620 1048.96 1097,76
I154.35 10.00~ 25,000 1102.57 1151,37
1200,00 10.913 25.000 1147.46 1196.26
1300.00 12.913 25.000 1245.30 1294.10
1400.00 14.913 25,~ 1:342.36 1391.16
1500,00 16.913 25.009 1438.53 1487.33
1800.00 18,913 25,000 1533,88 ! 582.48
1700.00 20.913 25,000 1627.69 1676.49
1704,35 21.000 25.000 1531.75 1680.55
1800.00 21 .t)00 25.0(30 1721.05 1769.55
1814,94 21.000 25.000 1735.00 175~.80
1~)0,O0 21.000 25.000 1814-.41 1863.21
2000.00 21.04)0 2.5,000 1907.77 1956.57
2030.46 21.000 25.000 1936.20 1985.00
2100.00 22.797 27.846 2000.73 2049.53
2200.00 25.45-~ 31.258 2091.99 2140.79
2300,(K) 28.176 34.057 2181,23 2230.03
2400,00 30.946 36.396 2268.21 2:317.01
2500.00 33,751 38,3 84- 2352.68 2401.48
Sperry-Sun Drilling Services
Proposal Report for P2-08 (M) WP3
Local Coordinates
Northings Fastings
(f~)
0.00 N 0,00 E
0.00 N 0.00 E
0,00 N 0.00 E
0.00 N O.O0 E
0.00 N 0.00 E
0.82 N 0.30 E
3.28 N 1.19 E
7,35 N 2.69 E
13,12 N 4,778
20.90 N 7.61 E
31.13 N 11,33 F_
43.97 N 16.53 E
52,11 N 20,2I E
59,62 N 23,71 E.
76.33 N 32.44 E
109.12 N 42.60 E
124.97 N 54.18 E
152.84 N 67.18 E
183,71 N 81.58 E
185,12 N 62.:2:3 E
216,19 N 96,72 E
221,04 N 98,98 E
248.67 N 111.8'7 E
281.15 N 127.01 E
291.04 N 131 ,§2 E
314.25 N 143.18 E
349,76 N 163.39 E
357.69 N 187.77 E
427.98 N 216.25 E
470.44 N 248,76 E
Global Coordinates Dogleg Vertical
Northings Eastings Rate Section
(fi) (~) (°/'mOlt) (fi)
5998595.59 N 68134)5.4~ E 0.00
5998595,59 N 681308.46 E 0,0O0 0.00
5998595,59 N 681308.46 E 0.000 0.00
,5998595.59 N 681308.46 E 0.00O O.00
5998595.59 N 661308.46 E 0.000
5998596.42 N 6~1305,74 E 1,000 0.79
5998598.90 N 681309.57 E 1 ,O00 3,16
5998603.03 N 681310.97 F_. 1.000 7.12
5995608.82 N 651312.91 E 1.000 12.65
5998616.66 N 681315.56 E 1.500 20.16
5998626.98 N 661319.03 E 1,500 30.08
5998639.95 N 681323,91 E 2.000 42.79
5998648.18 N 681327,40 E 2.t3~0 51.15
5996655.77 N 6;81330.72 E 2.000 58.94
5998674-,69 N 681338.99 ~ 2.000 78.34.
5998696.72 N 681,348.62 E 2.000 '[00,94
5998721.84 N 681359.60 E 2.000 126.70
5998750.02 N 681371,91 E 2,000 155.61
5995761.23 N 681385.55 E 2.000 187.62
5998782,65 N 68t386.18 F_ 2.000 189.08
5998814.06 N 681399.91 E 0.000 221
5998818.97 N 681402.05 E 0.000 2:26.3,3
5998846.90 N 681414,28 E 0.000 254,95
5998879.74 N 681428.61 E 0.000 286.66
5998889,74 N 681432.98 E 0,0D0 298.9o__
5998913.22 N 881443.98 E 3.000 323.51~
5995949.21 N 681463.31 E 3.000 362.90
5998987.73 N 681486.76 E 3.000 406.97
5999028.67 N 681514-.26 E 3.0G0 455.59
5999071,93 N 681545,74 E 3.000 508.62
Alaska State Plane Zone 4
Point Mclntyre Pad 2
Comment
KOP - Start Dir @ 1.00O°/lOOft: 400.00ft MD, 400.001t TVD
Start Dir @ 1,500"71008 - 800.00It MD, 790.68ft 'rVD
Start DIr @ 2.000"1100ff: 1000.00it MD, 998.73ff TV'D
Start IDIf @ 2.000o/10Oft: 1154,35f~ MD, 1151,37ff '['VD
End D~r, Sa~l @ 21,000°' 1704.3511 MD, 1680.55ft TVD
SASE PERMAFROST
Start Dir @ 3.000<Yl00ft' 2030.458 MD, 1985.0-D[t TVD
1I June, 199~ ~ 16:f6 - 1- Dri$1Quest
Shared Services Drilling
Point Mclntrye
Measured
Depth
Incl. Az[m.
Sperry-Sun Drilling Services
Sub-Sea Vertical Local Courdinstes
Depth Depth Northings Eastings
(ft) (fi) (ft)
2600.00 36.584- 40,0B9 2434.42 24 83.22
2700.00 39.4.,39 41,599 2513,20 2562.O0
2800.00 42,310 42.927 2588.8'[ 2637, 61
2909,0,0 45.195 4-4.117 2661.04- 2709.84
3000.00 48.092 4,5,192 272.9,69 2778.49
3 ! 00.00 50.997 46.174 2794.57 2843.37
3200.00 53,910 47.078 2855.50 2904.30
3300,00 56.830 47.918 2912,32 2961.12
3400.00 59.754 48,703 2964,BB 3013.68
2{500.00 62.684 49.443 30'[ 3.02 3061,112
3578.99 65.000 50.000 3047.84- 3096.64
3600.00 65.000 ,5~.000 3056,7:2 31. 05.52
3700.00 65.000 50.00,0 3096.98 3147.78
3800.00 65.0(N) 50.000 3141.24 3190.04
3900,00 65,000 50.000 3183,50 3232.30
4OD0.00 65.000 50,000 3225:77 3274,57
4100.00 65,000 50.000 3268.03 3316.83
42.00.00 65.000 50.000 3310.29 3359.09
4300,00 65.000 50.000 3352,55 3401.35
4~01).09 G5.0OO 50.030 3394.81 3443,61
4500.00 85.0-0,0 50.000 3437.08 3485.88
4600.00 65,000 50.000 3479,34 3528.14
4700.00 6,5.000 50,600 3521 .BO 3570.40
4800.00 65.000 50.00,0 3563.86 3612.66
4900.00 65.000 50.000 3606.12 3554.92
5000.00 65,000 50.000 3648,38 3697.18
5100,00 65.000 50.0(30 3690.65 3739.45
52OD.DO 65.000 50.000 3732.91 3761..71
5300.00 65.0 EN) 50.000 3775,17 3823.97
5400.00 65,000 50.000 ;3817.43 3866,23
Proposal Report for P2-08 (M) WP3
515,02 N 285.22 E
561.58 N 32__5.5l E
606.98 N $69.53 E
660.11 N 417.16 E
711.81 N 468,26 E
764.96 N 5?_.2.71 E
819.39 N 580.34 E
874,97 N 641.09 E
931.54 N 704.53 E
988.94 N 770.75 E
1034.77 N 824,84 E
1047.01 N 839.43 E
1105.27 N 908.85 F_.
1163.52 N 978,28 E
1221.78 N 1047.71 E
1280.04 N 1117.13 F_
1338,29 N 1186.56 E
1396.55 N 1255.99 E
1454.151 N 1325.42 E
'[513.06 N 1394.84 E
1571,32 N I464,27 E
162:9.57 N 1533.70 E
168'7.83 N 1603.13 E
1746.09 N 1672,55 E
1804,34 N 1741.98 E
1862.60 N 1611.41 E
1920.86 N 1880.83 E
1979,11 N I950.26 E
2037.37 N 2019.69 E
2095.63 N 2089.12 E
Global Coordinates Docjleg Vertical
Nofl. hin§s Easti n§ s R ate Section
(ft) (~t) (o/~ooft) (~t)
5999117.36 N 681581.09 'E 3.000 565.92
5999164,90 N 68162.0,24 E 3.000 627,34
5999214.36 N 681663.08 E 3,000 692.69
5999265.63 N 681709.48 E 3.08,0 761.82
5999318,56 N 681759.31 E 3.000 834.5l
5999373.00 N 681812.45 E 3,600 91.0.59
5999428.82 N 681868.75 £ 3.000 989.6,.3
5999485,85 N 681928,05 E 3.000 1072.03
5999543.95 N 681990.18 E 3,0~)0 1156.95
5999602.94 N 662054.99 E 3.009 1244,36
5999650.07 N 682107~95 E 3.000 1315.01
5999 562.66 N 682122.23 E 0,009 1333.98
5999722.58 N 682190.23 £ 0.000 142426
5999782,51 N 682258.22: E 0.000 1514.54.
5999842.43 N 682326.21 E O,ODO 1604.82
5999902.36 N 682394.21 E 0.000 1695.11
5999962,28 N 6824 52,20 E 0.000 1785.39
6000022..20 N 682530.I9 E 0.009 1875,67
600'0082.'t3 N 662598.19 E 0.000 196.5.95
6000142.05 N 682666,18 E 0.000 2056.24
6000201.97 N 682734.'[7 E 0.0D0 2146,52
6~00261.90 N 682802.17 E O.O00 2236.80
6000321.82 N 682870,16 E 0.000 2327.0,8
6000381,75 N 682935.15 E 0,0DO 2417.37
600~41.67 N 683006.15 F__ D.O00 2507.65
6;000501.59 N 683074,14 E O.OOO 2597.93
6000561,52 N 683142.13 E O,OOO 2688.21
6000621.44 N 653210.13 E 0.000 2778.50
600'0681.36 N 683278,12 E 0.000 2668,78
6000741,29 N 683346.11. E 0,000 2959.06
Alaska State Plane Zone 4
Point Mclntyre Pad 2
Comraent
End Dlr, Sli]I @ 65.000°' 3576.990 MD, 3096.64[t 'l-VD
Conb'~ued, , ,
z
11 June, 1998 - 16:16 -2. Drl# Quest
Shared Services Drilling
Point Mclntrye
Measured
Depth
Incl, AzTm,
Sperry-Sun Drilling Services
Sub-Sea Vertical Local Coordinates
Depth Depth N orthtngs Easflngs
(fi) (fi) (ft)
5500.00 65.000 50.ODO 3859.69 39 08.49
5600.00 65.000 50.000 3~JO 1.96 3950.76
5700.00 65.000 50,000 3944.22 3993.02
5500,00 65,000 50,600 3986.48 4035.28
5900.00 65.000 50.000 4028.74 4077.54
6~300,00 65.000 50.000 4071.00 4119,B0
6100.OO 65.000 .50.0 [~ 4113.26 4162.06
6200.00 65.000 50.000 4155.53 4204.33
6300.00 65.000 50.000 4197.79 4946.59
6400.~0 65.000 50.0-30 4:240.05 4288.65
6500.00 65.000 50.000 4282,31 4331.11
6600.00 65.000 50.000 4324.57 4373.37
6700,00 65.000 50.000 4-356.64 4415.64
6500.00 65.00'0 50,01~ 4409.10 4457.90
6900.00 65.000 50.000 4451.36 4500.16
7000.00 65.000 50.000 4493.62 4542.42
716,3,00 65.000 50.0173 4535.88 4584.68
7200.00 65.000 50.000 4-578.15 4626,95
7300.00 65.000 50.000 4620.41 4669.:21
7400,00 65.000 50.0g0 4662.67 4711.47
7500.00 65.000 50.000 4704,93 4753.73
7512.00 65.000 50,000 4710.00 4758.80
7600.00 65.000 50,000 4747.19 4795.99
7700.00 65.000 50.000 4789,45 4 838.25
7800.00 65.000 50,000 4831 2'2: 4880.52
7900.00 65.000 50.000 4873.98 4,92.2.78
7961.57 65,0~ 50.00,0 4900.00 4948.80
~DD,0.OD 65.000 50.000 4916.24 4965,O4
8l 00.00 65.000 50.000 4,95EL50 5007.30
8200.00 65.0(33 50,OtX) 5000.76 5049.56
Proposal Report for P2-08 (M) WP3
2153.66 N 2158.54 E
2212.14 N 2227.97 E
2270.30 N 2297.zl 0 E
232_B.65 N 2366.82 E
2386.91 N 2436.25 E
2445,16 N 2505°68 E
2503.42 N 2575.11 E
256i,68 N 2644.53 E
2619.93 N 2713.96 E
2678.19 N 2763.39 E
2736.45 N 2852.82 E
2794,70 N 2922.24 E
2852.96 N 2991.67 E
2911.2I N 3061.10 E
2969.4-7 N 3130.52 E
3027.73 N 3199.95 E
3085.98 N 3269,38 E
3144,24 N ~B.81 F_.
3202.50 N 3408,23 E
3260.75 N 3477,66 E
3319.01 N 3547.09 E
3326,00 N 3555,42 E
3377,26 N 3616.51 E
3435.52 N 3685.94 E
3493.78 N 3755.37 E
3552.03 N 3824.50 E
3587.90 N 3867.54. E
3610.29 N 3894.22. E
3668.55 N 3963.65 E
372.6.80 N 4033_08 E
Global Coordinates Dogleg Vertical
N orthlngs E=sting s Rate Sectlon
(ft) (fi) (°/10~) (ft)
6000801,21 N 683414-,11 E 0.000 3049.34-
6000861.14 N 683482.10 E O.ODO 3139,63
6000921.06 N 683550.09 E O.000 3229,91
6004980.98 N 663618.09 E 0.000 3320.19
6001040.91 N 683686,08 E 0.000 3410,47
6~01100.83 N 683754.07 E 0,000 3500.76
6001160.75 N 663822.07 E 0,600 3591.04
6001220.68 N 683890.06 E 0.00O -,3681.32
6001280.60 N 6B3958.05 E O.O00 3771.60
5001340.53 N 684026.05 E O.QO0 3861.~9
6001400.45 N 684094.04 E 0.000 3952.I7
6%01460,37 N 654162.03 E O.O00 4042.45
6001520.30 N 684230.03 E 0.000 4132.73
6001580..22 N 6114298.02 E 0.0O0 4223.02
6001640.14 N 684366,01 E 0.O00 4313,30
6001700.07 N 68443A.01 E O,0OO 4403.58
6001759.99 N 664502.00 E 0,000 4493.86
6001819,92 N 684569,99 E 0,{330 4584.15
6001879.54 N 684637,98 E 0,000 4674.43
6001939.76 N 684705.98 E 0.O00 4764.71
6901999.69 N 684773,97 E 0,O.0O 4854.99
6002006.87 N 6847B2.'[3 E; D.000 4865.82
6002059.61 N 684841.96 E 0.0O0 4945:2'7
6002119.53 N 684909,96 E 0, O0O 5035.56
61)02179.46 N 6849'77.95 E O.000 5125.84
6002239,38 N 685045.94 E 0,600 5216.12
6002276,28 N 685087.8I E 0.00O 5271.7'1
6002299.3'1, N 685113.94 E 0.000 5306.40
6002359.23 N 685181,93 E 0,0'0.3 539.~.69
60024.19.15 N 685249.92 E 0.000 5466.97
Commetlt
T-,S ($v-1)
9 5/8' CasinE
Alaska State Plane Zone 4
Point Mclntyre Pad 2
Continued,,.
z
11 June, 1998- 16:;~E - 3- Dri$[~tuest
Shared Services Drilling
Point Mclnlrye
M eas~red
Depth
(it)
Incl. Azim.
Sub-Sea
Depth
(~)
Sperry-Sun Drilling Services
Vertical Local Coordinates
Depth Not-thin gs Easfl ngs
m) (ft) (it)
8300.00 65.0(~3 50.000 5043,03 5091.83
84Q0,00 65,000 50.000 50~5.29 5134.09
15500.~;3 65.000 50.000 5127.55 5176.35
8529.4 6 65.000 50.000 5140 ,(X) 5l 88.80
8555.96 65.009 50.04343 5151.20 5200,00
BTDD.{)0 64.981 49.933 5169.82 5218.62
8700.00 64.938 49.782 5212,14 5260.94
8800.00 64.8,94 40,6.30 5254.54 5303,34
89-0,9,00 64.851 4,9.479 5297.00 5345.80
9000.00, 64.808 49.326 5339.,~3 5388.33
9100.00 64,766 49.174 5382.13 5430.93
9200,00 64.723 49.022 5424.80 5473.60
9300.00 64~.681 48.869 5467.53 5516 ;33
9400.00 64,639 48,717 55~ 0.33 5559.13
9500.00 64.596 48.564 5553.19 5601.99
9600.00 64,55,5 48.412 5596.13 5644.93
9700.00 64,513 48,259 5639.`[2 5667.92
98§0.00 64.47I 46.t 06 5682, ~ 9 5730.99
9900.O0 64.430 47.953 5725;32 5774.12
10000.OD 64,388 47,6CO 576;8.51 5~17.31
101 ~0,00 64.347 47.647 5811.77 5860,57
10200.~0 64.306 47.494 5855.10 5903.90
10300.00 64,265 47,340 5898.48 5947.28
10400.00 64,225 47.187 5941.94 5990.74
10500,00 64.184 47.033 5985.45 6034.25
10600.00 64.144 46,6159 6029.03 6077.83
10700.00 F:¢.. 104 46.726 6072.67 6121,47
1081~9.00 64.064- 46.572 61 l 6.3§ 6165.18
10900.00 64.024 46,418 6160.15 6:208,95
11000.00 63,964 46.264 6203.98 6252.78
Proposal Report for P2-08 (M) WP3
3785,06 N 4102,50 E
3943,3:2 N 4-171.93 ~=
3901.57 N 4241.36 E
3918,74- N 4261.81 E
3934.17 N 4280.21 E
3959.84 N 4310_77 E
4018,,25 N 4389.03 F_.
4076.83 N 4449.11 E
4135.56 N 4518,O1 E
4194.46 N 4586.73 F_
4253.51 N Zl655,27 E
4312.73 N 4723.62 E
4372.11 N 4791.80 E
4431.65 N 4859.80 E
4491.35 N 4927.6'[ E
4551.21 N Zl995.24 E
46`[1.22 N 5062.68 E
4671,40 N 5129.95 £
4731.74 N 5197.03 E
479223 N 5263.92 E
4 952,8~ N 5330.63 E
4913.69 N 5397,15 E
4-974.65 N 5463.49 :E
5035.77 N 5529.64 E
5097.05 N 5595,61 E
5158.48 N 5661.39 E
5220.07 N 5726.98 E
5291.81 N 5792.38 E
5343.71 N 5~57.60 E
5A05.76 N 5922.62 E
Gtoba! Coordinates Dogleg Vertical
North[ngs Eastings Rate Section
fit) fit) (°/1O0~) (it)
6002479.08 N 665317.92 E 0,000 5577.25
6002539.00 N 685355.91 E 0.00D 5667.53
6002598.92 N 655453.90 E 0.000 5757.82
6002616.58 N 685473,94 E 0.G00 5784.42
64302632,4-6 N 685491.96 E 0.000 58Q8,34
6002658.85 N 685521,68 E 0.144 5848.10
6002718.94- N 685599.70 E 0.~44 5938,37
6002779,17 N 6~5657.34 E 0,144 61)28.63
6002839.56 N 685724.79 E 0.144 61;18.88
6t302900~10 N 685792.06 E 0.~44 6209.11
6002960.150 N 685859,15 E 0.144 6299.33
6003021,66 N 685926.05 E_ 0.144 6,389.54
601)3082,6~ N 685992.77 E 0.144 6479,73
6003143.85 N 886059.30 E 0.144, 6569~91
6003205.18 N 686125.64 E 0.1;44 6660.07
6003266.66 N 686191,60 E 0.144 6750,22:
6003328.30 M 686257.77 E 0.144 6840.35
60033<J0,0~ N 686323.55 E 0,144 6930.46
6003452.03 N 686359.15 E 0.144 702{),55
6003514.13 N 686454.55 F. 0.144 7110.63
~76.39 N 686519.77 E 0.144 7200.68
6003638.79 N 686584.80 E 0.144 7290,72
6003701.34 N 688649.64 E 0,144 7380~73
600376A.05 N ~86714.29 E 0.1zlZl 7470.73
6003826.9t N 6867'7'8.75 E 0.14.4 7560.70
6{}03899,9Z N 686843.02 E 0.144 7650.65
6003953.08 N 686907.10 E 0.144 '7740.58
6004016.39 N 686970,98 E O, 144 7830,48
6904079,8'6 N 687034.68 E 0.144 7920.36
6004143.47 bi 687098.18 E 0.144 8010.22.
Alaska State Plane Zone 4
Point Mclntyre Pad 2
Comment
K-15
BHA TeT[der'~"7 ~ 0.144°/101)ft: 8555.96ft MID, 5?_O0.O0ftTVD
11 June, 1998- 1E: 16 -4- DriiiQuest
Shared Services Drilling
Point Mclntrye
Measured
Depth
Incl. Azim.
Sub-Sea
Depth
Vertical
Depth
~ 1100.00 63.945 46.1 lO 6247 J~7 6296.b'7
11200.O0 63.905 45.955 6291.83 6340.63
11300.00 63.866 45.80 ~ 6335.84 6384.64
11400.00 63.627 45.647 637932 6426.72
11500.00 63.788 45.4~2 6424.06 6472.86
~ 1600.00 63.750 45,337 6468.26 6517.06
11700.OO 63.7'/~ 45.182 6512.52 6561.32
11500.00 63,673 45.027 6556.84 6605_64
1190~3.00 63.EG4 44.572 6601 22 6650.02
12009.00 63.596 44.717 6645.66 6694.46
I2100.00 53.559 44.562 66~J0.16 6735.96
122/3/).00 63.521 44.407 6734.71 5'783.51
12300.00 63,483 44.251 6779.33 6828.13
12400.00 63.446 44.096 6624.O1 6872.81
12500.00 63.409 43.940 6868.74 6917.54
12600.00 63,372 43,784 6913.53 69 52.33
12700,00 63~35 43.629 6958.38 7007.18
12§00.00 63.298 43.473 7003.28 7052.08
12892.78 63,264 43,328 7045,09 7093.80
12900,0(l 63.262 43.317 7048.25 7097.05
13000.00 63.22_5 43.160 7093,27 714:2.07
13100.00 63.189 43.004 7136.34 7187.14
13:200.00 63.153 42.848 7183.48 7232.28
~3300.00 63.117 42.691 7228,67 7277.47
13400,00 63.082 42.535 7273.9l 7322,71
13500.00 63.046 42.378 7319.21 7366.01
13600.00 53,011 .~2.222 7364.56 7413.36
13700.00 62.976 42.065 7409.97 7458.77
1.3800.00 62.941 41.908 7455,44 7504.24
13900,00 62.90S 41.751 7500.96 754.9.76
Sperry-Sun Drilling Services
Proposal Report for P2-08 (M) WP3
Local Coordinates Global Coordinates Dogleg Yert[cai
N orthings Eastings Northings Eastings R~te Section
fit) (fi) (ft) (it) (°/1O0ft) (fi)
5467.97 N 591~7.46 E 6{)0420723 N 68716~.4S E 0,144 8100.05
5530.33 N 6052.11 E 6004271.14 N 687224.60 E 0.144 8189.86
5592.84 N 6116.57 E 6004,335.19 N 687287.52 E 0.144 8279,64
5655.50 N 5150.54 E 6004399.40 N 657350.25 E 0.144 6369.39
5718.32 N 6244.91 E 6(304463,75 N 687412,79 E 0.144 8459.12
5781.29 N 6306.B0 E 6004528.25 N 667475.13 E 0,144 8548.82
5844.41 N 6372.49 F_ 6004592.90 N 687537,27 E 0.144 86,38.49
5907.68 N 6436.09 E 6/K)4657.69 N 687599.22 E 0.144 5728.13
5971.10 N 5499.31 E 6004722.63 N 687660,97 E 0.144 8817.75
6034.67 N 6562.42 E 6004787,71 N 687722.53 E 0.144 8907.33
6098,39 N 6625.35 E 6004852.94 N 687783,69 E 0.144- 8996.8~
6162,26 N 6688.08 E 6004918.31 N 6878,45.05 E 0,144 9066.40
6226.28 N 6750.62 E 6004983.53 N 687906.02 E 0A44 9175,69
6290.45 N 6812.96 E. 6005049.49 N 687966.79 E 0.144 92.65.35
6354.76 N 6875.11 E 60/)5115.30 N 655027.35 E 0.144 935437
6419,23 N 6937.06 E 6005181.25 N 68801~7.73 E 0.144 9444.16
6A63.54 N 6998,82 E 6~1~52.47~34 N 666147.90 E 0,144 9533.52
6548,60 N 7050,38 E 6005313.57 N 688207,67 E 0.144 9622.84
6608,81 N 71'[7.32 E 6005375.15 N 688263.33 E 0.144 9705.69
6613.50 N 7121.75 E 6OI)5379.94 N 666267.64 E O.144 9712.13
6678.55 N 7~62.92 E 6005446,46 N 686327.21 E 0,144 9801.38
6743.75 N 7243,89 E 6/H)5513.12 N 588386.59 E 0A44 98~J0.60
6809.09 N 7304.66 E 6005579.91 N 6884,45.76 E 0.144 9979.78
6874,58 N 7365.24 E 6005646.85 N 668504.73 E 0.144 ~ 0068.92
694021 N 7425.62 E 6005713.93 N 6885~3.50 £ 0.144. 10158.02
7005.98 N 7485.80 E 600.5781.14 N 688622,06 E {).144 10247.09
7071.90 N 754538 E 6005846,50 N 688680.,43 £ 0.144 10336.11
7137.96 N 7605.56 I:_ 6005915.99 Iq 685738.59 E 0.144 ~0425.10
7204,17 N 7665.14 E 600591~'.3,6:2 N 668796.54 E 0.144- 1(3,514.05
7270...51 N 7724.52 E 600605'[.39 N 6881~54.30 E 0,144 't0602,95
Comment
WEST SAK (SEISMIC TOP)
Alaska State Plane Zone 4
Point Mcintyre Pad 2
CohO'hued,..
Dri~JQues!
'0
D
June, ?998- 16:16
-5-
Shared Services Drilling
Point Mclntrye
Measured
Depth
incl. Azim,
Sub-Sea
Depth
(ft)
Vest, ca!
Depth
14/300.0~ 62.87Z 41.594- 7546.53 7595,33
14100.00 62.837 41.436 7592.15 7640.95
14200.00 62.803 41.279 7637,83 7686.63
14300.00 62.769 41.122 7683.56 7732.36
14400.01) 62,735 40.9~ 7729.35 77'76.15
14500.00 62.701 40.807 7775.19 7823.99
14600,00 62.6b-'7 40,649 7821.08 7859.88
14700.00 62.634 40.491 7867.(Y2 7915.82
't4800.00 62.601 40.333 7913.01 7961,81
14~00,00 62.566 4Q.175 7959.05 8007.85
15000.00 62,535 40.017 $005,15 8053.95
15100.00 82.502 39.859 8051.30 8109.10
152(}O.OB 62.470 39,701 8097.49 8146.29
15300.00 62,437 39.542 6143.74 6192.54
15400.00 62.405 39.384 8190.04 8238.84
15500.00 62.373 39.225 8236,38 1~?.85.18
15600.00 52.342 39,067 6262.T6 8331
15700,00 62.310 38.908 8329.22 8378.02
158G{),00 62,279 38.749 8375.71 6424.51
15900.00 62,247 38.590 BA2:2:.25 8471
16000.00 62.216 38.431 8468.84 8517.64-
16100.O0 62.186 36.272 8515,48 8564.28
16200.00 62,155 38.1 t3 8562.17 8610.97
16300.00 62.124 37.954, 8608.90 6657.70
16~00.O0 62.094 37.794 8655,65 8704.41~
1. 6500.00 62,084 37.635 8702.50 875'1. ~30
16600,00 62.034 37.475 874.9.37 8'798.17
16700.01) 62.004. 37.316 679 6,29 8845.09
16800.00 6%975 37.15~ 8843.26 8B92.06
16900,00 61.945 36.996 8~90.27 8939,07
Sperry-Sun Drilling Services
Proposal Report for P2-08 (M) WP3
Local Coordinates
Northlngs Eastings
fit) (~)
7337.00 N 7763.70 E
7408,63 N 7842,66 E
7470.40 N 7901.46 E
7537.31 N 7960.04 E
7604.37 N 8018.4:2 E
7b"7~.56 N 8076.59 E
7738.89 N 8134.56 E
7806.36 N 8192.33 E
7873.97 N 8:249.89 E
7941.72 N 8307,25 E
B009.60 N 8,364.41 E
8077,62 N 8421.36 E
5145,78 N 8476.11 F-.
6214.08 N 8534.65 E
8282,51 N 8590,99 E
6351.06 N 8F:~7.12 E
8419.78 N 6703,04 E
8488.62 N 8756.76 E
8557.59 N 8614.27 E
8626.69 N 8669,57 E
8595.93 N 8924.67 E
8765.30 N 8979,56 E
8834,80 N 9034.2:4 E
8904.44 N 9068.71 E
8974.21 N 9142.97 E
9044.10 N 9197.02 E
9114.13 N 9250,86 E
9184.29 N 9304.49 F_..
9254,58 N 9357.91 E
9325.00 N 9411.13 E
Global Coordinates Dogleg Vertical
Northings Eastings Rate SecEon
(fi) (ft) (o/lOOft) (It)
6006119.29 N 688911,85 E 0.144 10691.82
6006187.33 N 688969.20E 0.144 10780.64
6~06255,51 N 669026.34 E 0.144 10869.42
6006323.~3 N 68901~3,2.8 E 0.144 10951~.16
6006392.27 Iq 68,91.40.01 E 0.144 11046.85
6006460.8,5 N 689196.53 E 0,144 ll 135.50
6006529.58 N 68,9252.85 E 0.144 11224:[0
6{306598,.43 N 68930,8.97 E 0.I44 11312.66
6006667.41 N 689364.87 E 0.144 't140l.'[8
6006736.53 N 689420.57 E 0.144 11489,65
6006805.79 N 689478.07 E O,144 ~ 1578.07
6006875.17 N 669531.35 E 0.~44 11666,44
6~)(3-6944,69 N 689566.43 E 0,144 11754.76
80070'[4.33 N 689641.30 E 0.144 11843.04
6007084.11 N 689695.96 E 0.144 11931.27
6007154.02 N 689750.41 E 0.144 12019.45
6007224.06 N~ 689804.65 E 0.144 12107.58
60t)7294,23 N 689856.68 E 0,144 12195.65
6007364..52 N 669912.50 E 0.144 12283.66
6007434,95 N 6§9966.l I E 0.144 12371.65
6007505.50 N 690019.51 E 0.144 12459.57
6007576.19 N 690072.89 E 0.144 12547.44
6007647,00 N 690125.67 E 0.144 12635.26
6007717.93 N 690178,44 E 0.144 12723.02
6007789.00 N 690230.99 E 0,144 't28'[0.'72
6007660.19 N 690283,33 E 0.144 12896.37
6007931.50 N 690335.46 E 0.144- 't 298S.97
6~8~02.94 N 69 0387.37 E 0.144 13073.51
6008074.51 N 690439.07 £ 0.144 1.3160.99
6008146.19 N 690490.56 E 0.144 13248.41
Comment
Alaska State Plane Zone 4
Point Mclntyre Pad 2
Con~hued...
x
11 Jute, 1996- 16:1E ' ~'
Sperry-Sun Drilling Services
Proposal Report for P2-08 (M) WP3
Shared Services Drilling
Point Mclntrye
Measured Sub-Sea Vertical Local Coordinates
Depth incl, Azi m. Depth Depth Northi ngs Eastings
(tt) (~t) (ft) (ft)
Globa~ Coordinates Dogleg Vertical
Northi rigs Easti ngs Rate Section
(fi) (ft) (onoaft) fit)
16978.08 61.922 36.571 8927.00 8975.80 9360.07 N 9452,52 E
17000.00 61.916 36.836 8937.32 8986.12 9395.55 N 9464.13 E
17063.03 61.598 36.735 6967.00 91)15.80 9440.06 N 9497.42 E
'1, 7~[ 00.00 61.887 36.676 8984.42 9053.22 9466.22 N 9516.91 E
17105.48 61,885 38.66'7 8967.D0 9035.80 9470.10 Iq 9519,80 E
17113.97 61 .BB3 36.654 6991.00 9039.80 9476.11 N 9524.27 E
6008202.25 N 69053D.61 E 0.144 13316.63
6008~18.01 N 690541.83 E 0.144 13335.78
6008263.33 N 690574.03 E D.144 13390.1~2
6008269.94- N 6.90592,89 E 0,144 13423.09
60~93.89 N 690595.68 E 0.144 13427.87
6008300.00 N 690600,00 E 0.144 13435.28
17200.09 61.863 36.530 9031.56 9080,36 9537,02 N 9569.50 E
17278.53 61.846 36.417 9068.60 9117.40 9592.70 N 9610.66 E
17300.00 61.841 36,366 9078.73 9127.53 9 607.94- N 9621,89 E
17400,~0 61.8.[B 36~242 9125,94 9174.74 9678,98 N 9674.10 E
1741 B.53 61.814 36.215 9134.69 9163.49 9692.15 N 9683,75 E
6008362.00 N 690643.74 E 0.129 1351
6008418.66 N 690553.53 E 0.129 13576.82
601)6434.17 N 690694.40 E 0.129 19597.54
6008506,44 N 690744.85 E 0.129 13684.69
6(~365~9.85 N 690754.'[9 E_ 0.129 13700.83
data is in feet unless otherwise stated. Direclions and coordinates are relative to True North.
Vertical depths are relative to Well Reference. Northings and Eastings are relative to We[I Reference.
The Dogleg Severity is in Degrees per 100ff.
Vertical Section is from We[[ Reference and calculated along an Azimuth of 44.975° (True).
Based upon Minimum Curvature type calculations, at a Measured Depth of 17418.53ff.,
The Bottom Hole Displacement is 13700.83ft, in the Direction of 44.975° (True}.
Alaska State Plane Zone 4
Point Mclntyre Pad 2
Comment
K-10
HRZ
KALUB]K
~u~'H"A'Jo~de~cy @ 0.129°I100ff' 17113.97~t MD, 9039.801t'TVD
Ta~jel: P2-(M)TARGET, 2130.00 Radius., Geological
Total Deplh ' 17418.53ff MD, 9183.49flTVD
7" C~sin~l
x
DriP/Quest
June, 1998- 16:I7 -7-
JUN-!1-98 THU 04:26 PM SPERRY-SUN
NO,
1°'w5635754
P, 11
5631 Silverado Way #G
Anchorage, Alaska 99518
(907) 563-3256 Fax (907) 56347252
Shared Services Drilling
Grog Hobb$
Approved Well Close Approach Review
P2-OS(M) wp $
Tile almve mcnUoned well h~ been acam~ed mtag s£anda~d and-coili.qoa m~thod.~ via DF. AP,
i i fl i i m · i _ · i
'11,~ se. aa w~ perform~ with Ibc following
Start Sma h~spc~tto~ 72one
End $~m~ lnspecfiolt X..nnc
Starting Scan Radhm
Rate oF Radiu~ Inc~as~
37.00'
L 20p.00' __ ,
lO0.O0'
l~er 1000 ~ f~ a new-~d~ well ~, ~ DEAI*~ de~ault~ woul~ be e~l to 101.~5' a~ ~e S~ 8~ ~edou ~ne ~ s~d abov~
These ~mnb~S ara used lo prod~c u final ~ ~a~m of 1938.155' w~c]t ~ 967.226~ I~gcr ~an DE~S ~faull value of 970,~65'
S~n Pavame~rs
i l! i · i ! - ·
i ii i · . i! i i . i ! . ·
At this enlarged radius the followb~g wells were detcctM dud.g tho .sm
Note: ~s list may na include a~ fl)e wel~ da~TM, only fl~OS~ Of wbi~
-- m _ . m m 1-- m m
~encrnllon ~
P2-03
P2-06
802,53 'Ivff~
,
497.26 ~.D
F2-07 602.20
P2-0~ 599.97 'MD
.
· ,,
·
· · - _
P2-13 1401.74 rM"D
P2-15 3465,89 2vID
PZ-2,2 2619.02 'MD
P2-22PBI 2619.02 ~VlP
72-55 277,00 ° 55,62 '
~)~28 298,10 ~ Z5.37
16.23 275,70 ° 10,73
16,18 126,40 o 10.49
m _ , ~ , m
32,89 116,50 ~ 2%03
72,81 235.50 " 50.39
~3,23 65.30 ~ 31,04
132,23 34~.20 ~ 72,97
,
90,29 4.20" 65.56
90,29 ~,20 ~ 65.56
NO
'r6 Sssv
· ,
YI'~ TO $SSV 2000'
sssv '
-- m
YES 'ID SSS¥ ?.000'
· ,
YES I0 ~lO00"
yv/s :to sssv2oo;, -
- -m
Yr-xq TO 4000"
~ TO 4000"
YES TO 4OOO"
~MAJOR, ,
MINOR
MINOR
MINOR
MINOR
MINOR
MINOR
MINOR
MINOI~
MINOR
Tolerance Plot required:
. m
m mm ·
m I m fm ii
I ·
· . i
iL
Cio,se Approach Comments:
,A, BOVE WEt,LS Mt. lET B~ SH~4N To DRILL P2.-06 WP3
L-
· m I m · --
_ , · · ·
! I . · · m
· I _
Cio~ Approach Scan Performed by;
Checked by~
m _.
Approved by:
Date:
Date:
Dat¢:
m m i ·
!
Shared Services Approval:
· , _ · ·
mi _ i . i m _ m ! . i
mi _ _ mm m
m
. ~ . mi
I m m m
m
L.
Date:
..
· I .. i · . · I
H137167
VENDOR ALAS~,AST ! 4 (-,.r
DATE INVOICE / CREDIT MEMO DESCRIPTION GROSS DISCOUNT NET
042298 CK042298B 100~ 00 iOO_ OO
HANDLINg INST' S/H K~THY CAMPOA-'1OR X 51.~.~.
~ "WELL PERMIT CHECKLIST
FIELD & POOL
WELL NAM~~~
INIT CLASS. ~,,.,,, ,,"- ~,~",/ GEOL AREA
PROGRAM: exp [] dev,,,~ redrll [] serv [] wellbore seg II ann. disposal para req II
ADMINISTRATION
ENGINEERING
DAT
APPR ~
COMPANY ,,,,~.,,'~.,~
1. Permit fee attached .......................
2. Lease number appropriate ...................
3. Unique well name and number ..................
4. Well located in a defined pool ..................
5. Well located proper distance from drilling unit boundary ....
6. Well located proper distance from other wells ..........
7. Sufficient acreage available in drilling unil ............
8. If deviated, is wellbore plat included ...............
9. Operator only affected party ...................
10. Operator has appropriate bond in force .............
11. Permit can be issued without conservation order ........
12. Permit can be issued without administrative approval ......
13. Can permit be approved before 15-day wait ...........
14. Conductor string provided ...................
15. Surface casing protects all known USDWs ...........
16. CMl' vol adequate to circulate on conductor & surf csg .....
17. CM'[ vol adequate to tie-in long string to surf csg ........
18. CMl- will cover all known productive horizons ..........
19. Casing designs adequate for C, T, B & permafrost .......
20. Adequate tankage or reserve pit .................
21. If a re-drill, has a ~0-403 for abandonment been approved... '-'~~
22. Adequate wellbore separation proposed ............. (~ N
23. If diveder required, does it meet regulations ..........
24. Drilling fluid program schematic & equip list adequale ..... ~ ~N Ni
25. BOPEs, do they meet regulation ................ N
26. BOPE press rating appropriate; test to ,~-C>z:~ psig.
27. Choke manifold complies w/APl RP-53 (May 84) ........
28. Work will occur without operation shutdown ........... .
29. Is presence of H2S gas probable .................
30. Permit can be issued w/o hydrogen sulfide measures ..... Y N~Y N
31. Dala presented on potential overpressure zones ....... ~Y NNY/'~'~---~-
32. Seismic analysis of shallow gas zones. '
33. Seabed condition survey (if off-shore) .............
34. Contact nam. e/phon.e.for weekly progress reports ...... / Y N
[exploratory
ANNULAR DISPOSAL 35. With proper cementing records, this plan
(A) will contain waste in a suitable receiving zone; ....... Y N//
APPR DATE (B) will not contaminate freshwater; or cause drilling waste... Y
to surface;
(C) wiii~bt'impair.._mechanical integrity of the well used for disposal; .,Y/ N
(D) will nol damag~ producing formation or impair recovery from a /Y N
pool; and '
_..:_ (E) will not circumve~nt ~0 A. AC 25.~2.52 or 20 AAC 25.412. ,.,. : t/ Y N
ENGINEERING: UIC/Annular COMMISSION:
UNIT# //,/~C'. ~-'.~ ON/OFF SHORE ,~ ,"L.J .....
BEW,v' WM DWJ ~ /
JDI-I~,j_.~-/---/.~__~, RNC , ~
CO
GEO.~GY:
Comments/Instructions:
Mcheklisl ~ev 0512919~{
· WELL PERMIT CHECKLIST COMPANY
WELL NAME/'~'~. /~_.- (~ ~ PROGRAM: exp [] dev [] redrll [] serv,,~wellbore seg II ann. disposal para req II
FIELD & POOL
GEOL AREA ,,,~'~,~ UNIT# /,/~-3;"~ ON/OFF SHORE c~ ,,%.)
ADMINISTRATION 1
,~R DATE
ENGINEERING 14.
15.
16.
17.
18.
19.
20.
21.
22.
23.
24.
25.
27.
28.
29.
GEOLOGY
APPR
· Permit fee attached .......................
2. Lease number appropriate ...................
3. Unique well name and number ..................
4. Well located in a defined pool ..................
5. Well located proper distance from drilling unit boundary ....
6. Well located proper distance from other wells ..........
7. Sufficient acreage available in drilling unit ............
8. If deviated, is wellbore plat included ...............
9. Operator only affected party ...................
10. Operator has appropriate bond in force .............
11. Permit can be issued without conservation order ........
12. Permit can be issued without administrative approval ......
13. Can permit be approved before 15-day wait ...........
Conductor string provided ...................
Surface casing protects all known USDWs ...........
CMT vol adequate to circulate on conductor & surf csg .....
CMT vol adequate to tie-in long string to surf csg ........
CMT will cover all known productive horizons ..........
Casing designs adequate for C, T, B & permafrost .......
30.
31.
32.
33.
34.
ANNULAR DISPOSAL 35.
APPR DATE
N
Adequate tankage or reserve pit .................
If a re-drill, has a 10-403 for abandonment been approved .... -Y-N- ~ft.t/~
Adequate wellbore separation proposed ............. ~ N
If diveder required, does it meet regulations .......... _.--Y--N---/~7¢~- ~~-
Drilling fluid program schematic & equip list adequate ..... '~ N
BOPEs, do they meet regulation ................ ~~, N
BOPE press rating appropriate; test to 5"'(500 psig. N
Choke manifold complies w/APl RP-53 (May 84) ........ N
Work will occur without operation shutdown ........... N
Is presence of H2S gas probable ................. N
Permit can be issued WIG hydrogen sulfide measures ..... Y N ./
Data presented on potential overpressure zones ....... _Y__,.~ ~/ j ~
Seismic analysis of shallow gas zones ............. /Y,/N /C,//,r? ,
Seabed condition survey (if off-shore) ............. / Y N
Con. tact.nam, e/phon,e.for weekly progress reports ....... ./' Y N
lexplora~ory only]
With proper cementing records, this plan
(A) will'contain waste in a suitable receiving zone; ....... Y N
(B) will not contaminate freshwater; or cause drilling waste... Y N
to surface;
(C) will not impair mechanical integrity of the well used for disposal; Y N
(D) will not damage producing formation or impair recovery from a Y N
pool; and
(E) will not circumvent 20 AAC 25.252 or 20 AAC 25.412. Y N
GEOL,QGY:
ENGINEERING: UIC/Annular COMMISSION:
...................
JDH ' --' RNC
co
Comments/Instructions:
M:che~list rev 05129198
dlf: C:\rnsoffice\wordiar~\diana\checklist
Well History File
APPENDIX
Information of detailed nature that is not
particularly germane to the Well Permitting Process
but is part of the history_ file.
To improve the readability of the Well History file and to
simplify finding information, information of this
nature is accumulated at the end of the file under APPENDIX. ,
No special effort has been made to chronologically
organize this category of information.
Sperry-Sun Drilling Services
LIS Scan Utility
Tue Feb 16 09:17:30 1999
Reel Header
Service name ............. LISTPE
Date ..................... 99/02/16
Origin ................... STS
Reel Name ................ UNKNOWN
Continuation Number ...... 01
Previous Reel Name ....... UNKNOWN
Comments ................. STS LIS Writing Library.
Tape Header
Service name ............. LISTPE
Date ..................... 99/02/16
Origin ................... STS
Tape Name ................ UNKNOWN
Continuation Number ...... 01
Previous Tape Name ....... UNKNOWN
Comments ................. STS LIS Writing Library.
Scientific Technical Services
Scientific Technical Services
Physical EOF
Comment Record
TAPE HEADER
POINT McINTYRE
MWD/MAD LOGS
WELL NAME:
API NUMBER:
OPERATOR:
LOGGING COMPANY:
TAPE CREATION DATE:
JOB DATA
JOB NUMBER:
LOGGING ENGINEER:
OPERATOR WITNESS:
SURFACE LOCATION
SECTION:
TOWNSHIP:
RANGE:
FNL:
FSL:
FEL:
FWL:
ELEVATION (FT FROM MSL 0)
KELLY BUSHING:
DERRICK FLOOR:
GROUND LEVEL:
MWD RUN 3
AK-MM- 90004
J. PITCHER
K. WHITE
P2-08
500292289600
ARCO ALASKA, INC.
SPERRY-SUN DRILLING SERVICES
16-FEB-99
MWD RI/N 4
AK-MM-90004
B. ZIEMKE
C. DIXON
11
12N
14E
18
1073
.00
49.00
11.80
WELL CASING RECORD
1ST STRING
2ND STRING
3RD STRING
PRODUCTION STRING
REMARKS:
OPEN HOLE CASING DRILLERS
BIT SIZE (IN) SIZE (IN) DEPTH (FT)
12.250 9.625 5465.0
8.750 15971.0
1. ALL DEPTHS ARE MEASURED DEPTHS (MD) UNLESS OTHERWISE
NOTED.
2. MWD RUNS 1,2, AND 5 ARE DIRECTIONAL ONLY AND ARE NOT
PRESENTED.
3. MWD RUN 3 IS DIRECTIONAL WITH DUAL GAMMA P_AY (DGR)
AND ELECTROMAGNETIC WAVE
RESISTIVITY PHASE-4 (EWR-4).
4. MWD RUN 4 IS DIRECTIONAL WITH DUAL GAMMA RAY (DGR),
ELECTROMAGNETIC WAVE
RESISTIVITY P}{ASE-4 (EWR-4), COMPENSATED NEUTRON
POROSITY (CNP), AND
STABILIZED LITHO DENSITY (SLD).
5. ELECTROMAGNETIC WAVE RESISTIVITY PHASE-4 (EWR-4)
DATA FROM 13555'MD,
8051'SSTVD TO 14575'MD, 8467'SSTVD WAS LOGGED WHILE
TRIPPING IN FOR MWD
RUN 4 DUE TO FULL MEMORY ON SENSOR FOR MWD RUN 3.
6. DEPTH SHIFTING/CORRECTION OF MWD DATA IS WAIVED AS
PER THE E-MAIL MESSAGE
FROM TOM WALKER OF ARCO ALASKA, INC. ON 09 DECEMBER,
1998.
7. THIS WELL REACHED A TOTAL DEPTH (TD) OF 15971'MD,
9154'SSTVD.
SROP = SMOOTHED P_ATE OF PENETRATION WHILE DRILLING.
SGRC = SMOOTHED GAMMA RAY COMBINED.
SEXP = SMOOTHED PHASE SHIFT-DERIVED RESISTIVITY
(EXTRA-SHALLOW SPACING).
SESP = SMOOTHED PHASE SHIFT-DERIVED RESISTIVITY
(SHALLOW SPACING).
SEMP = SMOOTHED PHASE SHIFT-DERIVED RESISTIVITY (MEDIUM
SPACING).
SEDP = SMOOTHED PHASE SHIFT-DERIVED RESISTIVITY (DEEP
SPACING).
SFXE = SMOOTHED FORMATION EXPOSURE TIME.
SPSF = SMOOTHED COMPENSATED NEUTRON POROSITY (SANDSTONE
MATRIX-FIXED
(HOLE SIZE).
SNNA = SMOOTHED AVERAGE OF NEAR DETECTORS' COUNT RATES.
SNFA = SMOOTHED AVERAGE OF FAR DETECTORS' COUNT RATES.
SBD2 = SMOOTHED BULK DENSITY - COMPENSATED.
SC02 = SMOOTHED STANDOFF CORRECTION.
SNP2 = SMOOTHED NEAR DETECTOR ONLY PHOTOELECTRIC
ABSORPTION FACTOR.
ENVIRONMENTAL PARAMETERS USED IN PROCESSING NUCLEAR
NEUTRON LOG DATA:
HOLE SIZE = 8.75"
MUD FILTRATE SALINITY = 17000 - 25000 PPM.
MUD WEIGHT = 10.4 - 10.8 PPG.
FORMATION WATER SALINITY = 14545 PPM.
FLUID DENSITY = 1.0 G/CC
MATRIX DENSITY = 2.65 G/CC
LITHOLOGY = SANDSTONE
$
File Header
Service name ............. STSLIB.001
Service Sub Level Name...
Version Number ........... 1.0.0
Date of Generation ....... 99/02/16
Maximum Physical Record..65535
File Type ................ LO
Previous File Name ....... STSLIB.000
DEPTH INCREMENT:
FILE SUMMARY
PBU TOOL CODE START DEPTH STOP DEPTH
FET 5401.0 15879.0
RPD 5401.0 15879.0
RPM 5401.0 15879.0
RPS 5401.0 15879.0
RPX 5401.0 15879.0
GR 5408.5 15898.5
ROP 5481.0 15971.0
PEF 14490.0 15888.0
DRHO 14490.0 15888.0
RHOB 14490.0 15888.0
FCNT 14556.0 15853.0
NCNT 14556.0 15853.0
NPHI 14556.0 15853.0
$
Comment Record
FILE HEADER
FILE NUMBER: 1
EDITED MERGED MWD
Depth shifted and clipped curves; all bit runs merged.
.5000
BASELINE CURVE FOR SHIFTS:
CURVE SHIFT DATA (MEASURED DEPTH)
BASELINE DEPTH
$
MERGED DATA SOURCE
PBU TOOL CODE
MWD
MWD
$
REMARKS:
EQUIVALENT UNSHIFTED DEPTH
BIT RUN NO MERGE TOP MERGE BASE
3 5481.0 14572.0
4 14572.0 15971.0
MERGED MAIN PASS.
$
Data Format Specification Record
Data Record Type .................. 0
Data Specification Block Type ..... 0
Logging Direction ................. Down
Optical log depth units ........... Feet
Data Reference Point .............. Undefined
Frame Spacing ..................... 60 .lin
Max frames per record ............. Undefined
Absent value ...................... -999.25
Depth Units .......................
Datum Specification Block sub-type...0
Name Service Order Units Size Nsam Rep Code Offset Channel
DEPT FT 4 1 68 0 1
ROP MWD FT/H 4 1 68 4 2
GR MWD API 4 1 68 8 3
RPX MWD OHMM 4 1 68 12 4
RPS MWD OHMM 4 1 68 16 5
RPM MWD OHMM 4 1 68 20 6
RPD MWD OHMM 4 1 68 24 7
FET MWD HOUR 4 1 68 28 8
NPHI MWD P.U. 4 1 68 32 9
RHOB MWD G/CC 4 1 68 36 10
FCNT MWD CNTS 4 1 68 40 11
NCNT MWD CNTS 4 1 68 44 12
DRHO MWD G/CC 4 1 68 48 13
PEF MWD BARN 4 1 68 52 14
Name
DEPT
ROP
GR
RPX
RPS
RPM
RPD
FET
NPHI
RHOB
FCNT
NCNT
DRHO
PEF
Min
5401
0.55
8 54
0 52
0 45
0 46
0 35
0 11
23 95
1 71
552
2252
-0.02
2.39
First
Max Mean Nsam Reading
15971 10686 21141 5401
2144.41 223.8 20849 5481
575.22 88.0025 20981 5408.5
1549.13 3.38452 20824 5401
1813.92 3.76817 20824 5401
2000 4.26462 20824 5401
2000 8.22383 20824 5401
89.97 1.79927 19134 5401
55.64 31.637 2595 14556
2.91 2.51431 2797 14490
1391 690.193 2595 14556
3210 2874.7 2595 14556
0.38 0.0692027 2797 14490
14 4.29944 2797 14490
Last
Reading
15971
15971
15898.5
15879
15879
15879
15879
15879
15853
15888
15853
15853
15888
15888
First Reading For Entire File .......... 5401
Last Reading For Entire File ........... 15971
File Trailer
Service name ............. STSLIB.001
Service Sub Level Name...
Version Number ........... 1.0.0
Date of Generation ....... 99/02/16
Maximum Physical Record..65535
File Type ................ LO
Next File Name ........... STSLIB.002
Physical EOF
File Header
Service name ............. STSLIB.002
Service Sub Level Name...
Version Number ........... 1.0.0
Date of Generation ....... 99/02/16
Maximum Physical Record..65535
File Type ................ LO
Previous File Name ....... STSLIB.001
Comment Record
FILE HEADER
FILE NTJMBER: 2
RAW MWD
Curves and log header data for each bit run in separate files.
BIT RUN NUMBER: 3
DEPTH INCREMENT: .5000
FILE SUMMARY
VENDOR TOOL CODE START DEPTH STOP DEPTH
FET 5401.0 13555.0
RPD 5401 0 13555.0
RPM 5401 0 13555.0
RPS 5401 0 13555.0
RPX 5401 0 13555.0
GR 5408 5 14500.0
ROP 5481 0 14572.0
$
LOG HEADER DATA
DATE LOGGED: 09-NOV-98
SOFTWARE
SURFACE SOFTWARE VERSION: 5.07
DOWNHOLE SOFTWARE VERSION: 5.46
DATA TYPE (MEMORY OR REAL-TIME): MEMORY
TD DRILLER (FT) : 14572.0
TOP LOG INTERVAL (FT) : 5481.0
BOTTOM LOG INTERVAL (FT) : 14572.0
BIT ROTATING SPEED (RPM) :
HOLE INCLINATION (DEG
MINIMUM ANGLE: 45.2
MAXIMUM ANGLE: 74.9
TOOL STRING (TOP TO BOTTOM)
VENDOR TOOL CODE TOOL TYPE
DGR DUAL GAMMA RAY
EWR4 ELECTROMAG. RESIS. 4
$
BOREHOLE AND CASING DATA
OPEN HOLE BIT SIZE (IN):
DRILLER'S CASING DEPTH (FT) :
TOOL NUMBER
Pl139CRGM6
Pl139CRGM6
8.750
8.8
BOREHOLE CONDITIONS MUD TYPE:
MUD DENSITY (LB/G):
MUD VISCOSITY (S) :
MUD PH:
MUD CHLORIDES (PPM) :
FLUID LOSS (C3) :
RESISTIVITY (OHMM) AT TEMPERATURE (DEGF)
MUD AT MEASURED TEMPERATURE (MT):
MUD AT MAX CIRCULATING TERMPERATURE:
MUD FILTRATE AT MT:
MUD CAKE AT MT:
NEUTRON TOOL
MATRIX:
MATRIX DENSITY:
HOLE CORRECTION (IN):
TOOL STANDOFF (IN):
EWR FREQUENCY (HZ) :
REMARKS:
$
Data Format Specification Record
Data Record Type .................. 0
Data Specification Block Type ..... 0
Logging Direction ................. Down
Optical log depth units ........... Feet
Data Reference Point .............. Undefined
Frame Spacing ..................... 60 .lin
Max frames per record ............. Undefined
Absent value ...................... -999.25
Depth Units .......................
Datum Specification Block sub-type...0
LSND
9.50
51.0
9.0
1200
4.8
1.700
.871
1.500
2.500
Name Service Order Units Size Nsam Rep Code Offset Channel
DEPT FT 4 1 68 0 1
GR MWD 3 API 4 1 68 4 2
ROP MWD 3 FT/H 4 1 68 8 3
RPX MWD 3 OHMM 4 1 68 12 4
RPS MWD 3 OHMM 4 1 68 16 5
RPM MWD 3 OHMM 4 1 68 20 6
RPD MWD 3 OHMM 4 1 68 24 7
FET MWD 3 HOUR 4 1 68 28 8
63.9
Name
DEPT
GR
ROP
RPX
RPS
RPM
RPD
Min
5401
8 54
0 55
0 73
0 63
0 46
0 35
First
Max Mean Nsam Reading
14572 9986.5 18343 5401
156.65 84.989 18184 5408.5
2144.41 244.446 18051 5481
1549.13 3.24886 16176 5401
1813.92 3.54874 16176 5401
2000 4.10648 16176 5401
2000 9.15252 16176 5401
Last
Reading
14572
14500
14572
13555
13555
13555
13555
FET 0.11 15.79 0.816233 16176
5401
13555
First Reading For Entire File .......... 5401
Last Reading For Entire File ........... 14572
File Trailer
Service name ............. STSLIB.002
Service Sub Level Name...
Version Number ........... 1.0.0
Date of Generation ....... 99/02/16
Maximum Physical Record..65535
File Type ................ LO
Next File Name ........... STSLIB.003
Physical EOF
File Header
Service name ............. STSLIB.003
Service Sub Level Name...
Version Number ........... 1.0.0
Date of Generation ....... 99/02/16
Maximum Physical Record..65535
File Type ................ LO
Previous File Name ....... STSLIB.002
Comment Record
FILE HEADER
FILE NUMBER: 3
RAW MWD
Curves and log header data for each bit run in separate files.
BIT RUN NUMBER:
DEPTH INCREMENT:
FILE SUMMARY
VENDOR TOOL CODE
RPD
RPM
RPS
RPX
FET
PEF
DRHO
RHOB
GR
FCNT
NCNT
NPHI
ROP
$
LOG HEADER DATA
DATE LOGGED:
SOFTWARE
4
.5000
START DEPTH
13555.5
13555.5
13555.5
13555.5
14400.5
14490 0
14490 0
14490 0
14501 0
14556 0
14556 0
14556.0
14573.5
STOP DEPTH
15879.0
15879 0
15879 0
15879 0
15879 0
15888 0
15888 0
15888.0
15898.5
15853.0
15853.0
15853.0
15971.0
12-NOV-98
SURFACE SOFTWARE VERSION:
DOWN-HOLE SOFTWARE VERSION:
DATA TYPE (MEMORY OR REAL-TIME):
TD DRILLER (FT) :
TOP LOG INTERVAL (FT) :
BOTTOM LOG INTERVAL (FT) :
BIT ROTATING SPEED (RPM) :
HOLE INCLINATION (DEG
MINIMUM ANGLE:
MAXIMUM ANGLE:
TOOL STRING (TOP TO BOTTOM)
VENDOR TOOL CODE
DGR
EWR4
CNP
SLD
$
TOOL TYPE
DUAL GAMMA RAY
ELECTROMAG. RESIS. 4
COMPENSATED NEUTRON
STABILIZED LITHO DEN
BOREHOLE AND CASING DATA
OPEN HOLE BIT SIZE (IN):
DRILLER'S CASING DEPTH (FT) :
BOREHOLE CONDITIONS MUD TYPE:
MUD DENSITY (LB/G):
MUD VISCOSITY (S) :
MUD PH:
MUD CHLORIDES (PPM) :
FLUID LOSS (C3) :
RESISTIVITY (OHMM) AT TEMPERATURE (DEGF)
MUD AT MEASURED TEMPERATURE (MT):
MUD AT MAX CIRCULATING TERMPERATURE:
MUD FILTRATE AT MT:
MUD CAKE AT MT:
NEUTRON TOOL
MATRIX:
MATRIX DENSITY:
HOLE CORRECTION (IN):
TOOL STANDOFF (IN):
EWR FREQUENCY (HZ) :
REMARKS:
$
Data Format Specification Record
Data Record Type .................. 0
Data Specification Block Type ..... 0
Logging Direction ................. Down
Optical log depth units ........... Feet
Data Reference Point .............. Undefined
Frame Spacing ..................... 60 .liN
Max frames per record ............. Undefined
Absent value ...................... -999.25
Depth Units .......................
5.07
5.46
MEMORY
15971.0
14572.0
15971.0
54.7
68.3
TOOL NUMBER
Pl145HRLGM6
Pl145HRLGM6
Pl145HRLGM6
Pl145HRLGM6
8.750
8.8
GEM G P
10.50
44.0
8.8
17000
2.8
.170
.072
.220
.550
72.2
Datum Specification Block sub-type...0
Name
DEPT
GR
ROP
RPX
RPS
RPM
RPD
FET
NPHI
FCNT
NCNT
RHOB
DRHO
PEF
Service Order Units Size Nsam Rep
FT 4 1 68
MWD 4 API 4 1 68
MWD 4 FT/H 4 1 68
MWD 4 OHMM 4 1 68
MWD 4 OHMM 4 1 68
MWD 4 OHN~4 4 1 68
MWD 4 OF24M 4 1 68
MWD 4 HOLrR 4 1 68
MWD 4 P.U. 4 1 68
MWD 4 CNTS 4 1 68
MWD 4 CNTS 4 1 68
MWD 4 G/CC 4 1 68
MWD 4 G/CC 4 1 68
MWD 4 BARN 4 1 68
Code Offset Channel
0 1
4 2
8 3
12 4
16 5
20 6
24 7
28 8
32 9
36 10
40 11
44 12
48 13
52 14
Name
DEPT
GR
ROP
RPX
RPS
RPM
RPD
FET
NPHI
FCNT
NCNT
RHOB
DRHO
PEF
Min
13555.5
33 36
0 93
0 52
0 45
0 53
0 42
0.78
23.95
552
2252
1.71
-0.02
2.39
Max Mean Nsam
15971 14763.2 4832
575.22 107.591 2796
1870.31 90.5831 2796
33.26 3.85665 4648
46.08 4.53184 4648
50.53 4.81498 4648
49.33 4.99183 4648
89.97 7.17505 2958
55.64 31.637 2595
1391 690.193 2595
3210 2874.7 2595
2.91 2.51431 2797
0.38 0.0692027 2797
14 4.29944 2797
First
Reading
13555.5
14501
14573.5
13555.5
13555.5
13555.5
13555.5
14400.5
14556
14556
14556
14490
14490
14490
Last
Reading
15971
15898.5
15971
15879
15879
15879
15879
15879
15853
15853
15853
15888
15888
15888
First Reading For Entire File .......... 13555.5
Last Reading For Entire File ........... 15971
File Trailer
Service name ............. STSLIB.003
Service Sub Level Name...
Version Number ........... 1.0.0
Date of Generation ....... 99/02/16
Maximum Physical Record..65535
File Type ................ LO
Next File Name ........... STSLIB.004
Physical EOF
Tape Trailer
Service name ............. LISTPE
Date ..................... 99/02/16
Origin ................... STS
Tape Name ................ UNKNOWN
Continuation Number ...... 01
Next Tape Name ........... UNKNOWN
Comments ................. STS LIS Writing Library.
Reel Trailer
Service name ............. LISTPE
Date ..................... 99/02/16
Origin ................... STS
Reel Name ................ UNKNOWN
Continuation Number ...... 01
Next Reel Name ........... UNKNOWN
Comments ................. STS LIS Writing Library.
Scientific
Scientific
Technical
Technical
Services
Services
Physical EOF
Physical EOF
End Of LIS File