Alaska Logo
Department of Commerce, Community, and Economic Development
Alaska Oil and Gas Conservation
Commission
Loading...
HomeMy WebLinkAbout198-107 K :._} �':.kS: '*A J ,r Swaizatro. °w:;k�Y-As • el&' 111/7:c ts, THE E STAT r i - . --- - 333 til st Seven-,1 P F ,ue . <` ;) , Anchcrocc '2950;-3572 John McMullen 6 n/4 ,. Engineering Team Leader � tite 3UL I BP Exploration (Alaska), Inc. �W"• j 1 P.O. Box 196612 Anchorage, AK 99519-6612 Re: Prudhoe Bay Field, Prudhoe Oil Pool, PBU 02-07A Sundry Number: 314-298 Dear Mr. McMullen: Enclosed is the approved application for sundry approval relating to the above referenced well. Please note the conditions of approval set out in the enclosed form. As provided in AS 31.05.080, within 20 days after written notice of this decision, or such further time as the AOGCC grants for good cause shown, a person affected by it may file with the AOGCC an application for reconsideration. A request for reconsideration is considered timely if it is received by 4:30 PM on the 23rd day following the date of this letter, or the next working day if the 23rd day falls on a holiday or weekend. Sincerely, Cathy P. oerster �.�( Chair DATED this day of May, 2014. Encl. • STATE OF ALASKA RECEIVED ALASKA OIL AND GAS CONSERVATION COMMISt lON MAY 4 7 APPLICATION FOR SUNDRY APPROVAL z 20 AAC 25.280 0 S� ��¢ ++ +� Kt_ 1. Type of Request: IkOGisC ❑Abandon ®Plug for Redrill • 0 Perforate New Pool 0 Repair Well 0 Change Approved Program ❑Suspend 0 Plug Perforations 0 Perforate 0 Pull Tubing ❑Time Extension ❑Operations Shutdown 0 Re-Enter Suspended Well 0 Stimulate 0 Alter Casing 0 Other 2. Operator Name 4. Current Well Class 5. Permit To Drill Number BP Exploration(Alaska) Inc. 198-107 • 3. Address: ❑Exploratory 0 Stratigraphic Alaska 99519-6612 ®Development 0 Service P.O. Box 196612,Anchorage, 6. API Number: 50.029-20154-01-00 ' 7. If perforating: 8. Well Name and Number: What Regulation or Conservation Order governs well spacing in this pool? PBU 02-07A - Will planned perforations require a Spacing Exception? 0YesNo 9. Property Designatior 10.Field/Pool(s): ADL 028308 ' Prudhoe Bay Field/Prudhoe Bay Oil Pool ' 11. PRESENT WELL CONDITION SUMMARY Total Depth MD(ft): Total Depth TVD(ft): Effective Depth MD(ft): Effective Depth TVD(ft): Plugs(measured): Junk(measured): 12805' • 9005' • 12713' 9010' None 12547', 12692' Casing Length Size MD TVD Burst Collapse Structural Conductor 100' 20" 100' 100' Surface 2737' 13-3/8" 2737' 2737' 4930 2670 Intermediate 7471' 9-5/8" _ 7471' 6918' 6870/6820/8150 4760/3330/5080 Production Liner 2478' 7" 7270'-9748' 6736'-8456' 7240 5410 3230' 4-1/2" 9572'- 12802' 8315'-9006' 8430 7500 Perforation Depth MD(ft): Perforation Depth TVD(ft): Tubing Size: Tubing Grade: Tubing MD(ft): 10374'- 12695' 8981'-9010' 4-1/2", 12.6# 13Cr-85/L-80 9576' Packers and SSSV Type: 7"x 4-1/2" HES TNT Packer Packers and SSSV 9363'/8164' 7"x 4-1/2"Baker S-3 Packer MD(ft)and ND(ft): 9521'/8277' 12. Attachments: 13.Well Class after proposed work: ®Description Summary of Proposal ®BOP Sketch 0 Detailed Operations Program 0 Exploratory 0 Stratigraphic ®Development 0 Service 14. Estimated Date for 15. Well Status after proposed work: Commencing Operation. May 25,2014 0 Oil 0 WINJ 0 WDSPL 0 Plugged 16. Verbal Approval: Date 0 Gas 0 GINJ 0 GSTOR 0 Abandoned Commission Representative: 0 WAG 0 SPLUG ®Suspended 17. I hereby certify that the f. egoin. is true rect to the best of my knowledge. Contact: David Johnston,564-5985 Printed Name: J0:,'Mc me Title: Engineering Team Leader Em il: David.Johnston2©bp.com Signature: Phone: 564-4711 Date: 7/ r Commission Use Only ( , / Conditions of approval: Notify Commission so that a representative may witness \�^^ �� Sundry Number: L \ik ❑Plug Integrity BOP Test 0 Mechanical Integrity Test 0 Location Clearance RBDMS MAY 2 3 E 1: Other: 0 0 p 7`e5/ t 35U0 p5 I 4 / 71-erf)CdC ph/9 placcm ch * appro vccl per , o /M 25, //2(t ) Spacing Exception Required? 0 Yes ❑ No Subsequent Form Required: `a _ 4 U 4_ pp APPROVED BY l/ Approved By: (PAV61� 4(.4„..44.....--- COMMISSIONER THE COMMISSION Dates �ZZ—/ Form 10-403 Revised 10/701 z /Approved aoc i i&IIN1 nths from the date of approval S Submit In Duplicate Y� 7 J 4- ' `` 1 '' vv �/.7 S. 7. 14( To: Alaska Oil & Gas Conservation Commission h From: David Johnston "r CTD Engineer Date: May 6, 2014 Re: 02-07A Sundry Approval roval Sundry approval is requested to plug the 02-07A perforations as part of the drilling and completion of proposed 02-07B coiled tubing sidetrack. History and current status: 02-07A was drilled in 8/98, as a 2000' horizontal well completed with 1627' perfs in Z2A. In 2/01, a CIBP was set to shut in all but 397' of perfs closest to the heel. In 2/03 the CIBP was milled. In 7/03 a CIBP was set to shut in the entire lateral and perfs were added in Z2BI. Oil rate was added at a lower GOR. In 2009 the well was shut in with annular communication. In 2/11 it returned to service with a RWO, but gas rate was high. A down hole screen was run for solids control in 10/11 which knocked out some fluid rate, causing a jump in GOR. In 5/13 the screen was pulled to mill the CIBP and straddle Z2BI. In 6/13 Z2BI was straddled and the screen was rerun. In 8/13 the screen was pulled to test Z2A alone. It was still at an uncompetitive GOR. The well is currently a swing well, often shut in ,/ for high GOR. Proposed plan: 02-07B will exit from well 02-07A by the Nordic 1 Coiled Tubing Drilling rig on or around June 1, 2014. The 02-07B sidetrack will exit through the existing 4-1/2" liner and kick off in Zone 1, and target Zone 1B Reserves. The proposed sidetrack is a -2,010' horizontal Ivishak Zone 1B producer, which will access a -35 acre target south of DS-02. The lateral will be completed with a 3-1/2" X 3-1/4" X 2-7/8" L-80 liner which will be Fully cemented and perforated. This Sundry covers plugging the existing 02-07A perforations via the 02-07B liner cement job or a liner top packer set post rig with slick line if Liner lap test fails. (alternate plug placement per 20 AAC 25.112(i)). The following describes work planned and is submitted as an attachment to Form 10-403. A schematic diagram of the proposed sidetrack is attached for reference. !k welt c !t ro/bc<r q/- f 1)C07,7, GD/Q /7 S'40 ye. Coe // /' cam wit K C C/ea rite f a G y Pre-Rig Work (scheduled to begin May 25, 2014) 1. C Drift to PBTD with dummy whipstock. 2. V PT MV, SV, WV. 3. V Set TWC pre rig. Th'5 4. 0 Remove wellhouse and level pad. r,n cI/1) A Rig Work (scheduled to begin June 1, 2014) 1. MIRU and test BOPE 250 psi low and 3,500 psi high. (MASP 2,368 psi) ✓ 2. Pull TWC and Bull Head kill well. 3. Set a 4-1/2" Baker Whipstock (TOWS at 10,865' ELMD). 4. Mill 3.80" window and 10' of rathole. 5. Drill lateral: 4.25" OH, 2,010' (12 deg DLS planned). 6. Run 3-1/2" x 3-3/16" x 2-7/8" L-80 liner leaving TOL at —10,000' MD. 7. Pump primary cement job: 25 bbls, 15.8 ppg, TOC at TOL —10,000' MD * 8. Perform liner cleanout and RPM/GR/CCL log. 9. Perform liner lap test to 2,400 psi 10. Perforate liner based on log interpretation (-800'). 1''`t• / 11. Freeze protect well to 2,500' MD. PTO 12. Set TWC; RDMO. Post-Rig Work 1. 0 Re-install wellhouse, flow line and pull TWC 2. S Set 45KB liner top packer if needed * 3. S Set GLV's 4. 0 Test Separator *Approved alternate plug placement if liner lap test fails per 20 AAC 25.112(i) David E. Johnston CTD Engineer 564-5985 CC: Well File Joe Lastufka TREE= , ' 5X7FMC WB.LFEAD= FMC02-07A SA}- .. NOTES: W ELL ANGLE>70°@ 10466' ACTUATOR= BAKER P1flAL KB.B-E 58' BF.ELEV= ? I ' KOP= Max Angle= 99'G 10698 2208' I—4-1/2 FES X NP,D=3.813" Datum MD 10203' Datum TVD= 8800 SS GAS LIFT MANDRELS ND 20"COUCTOR D 94#,N-40, =19.124" -I 100' ST MD TVD DEV TY FE VLV LATCH PORT DATE 3 3719 3697' 20 MMG tont FRCP 16 03/08/11 13-3/8"CSG,72#,N-80 BTRS,D=12.347" H 273T © 2 6652 6186 29 MMG SO RK 20 03/08/11 D 9.5/8"X 7"BKR LTP&HGR, =6.25' — 7270' 1 9215 8062 47 KBG2 DMY BK 0 02/22/11 MIIOUT WSDOW(02-07A) 7471'-?' 9-5/8"CSG,40#/47#,N-80/RS-95, —I 7471' H D=8.835"/8.681' I it ----1 9332' H4-1/2 HES X MP,D=3.813" Minimum ID = 3.813" @ 2208' ELM g 9363' --17X4-1/2"HES TNT FKR,D=3.875" 4-1/2" HES X NIPPLE I I 9400' —I4-112 HES X NP,D=3.813' 4-1/2"TBG,12.6#,13CR-85 VAM TOP, H 9470' \ .0152 bpf,D=3.958' 4-1/2"TUBING STUB (02/20/11) —I 9474' \I 9485' H7 X 4-1/2"UNIQUE OVERSHOT Z g-----------1 9521' 1---17 X 4-1/2"BKR S-3 PKR,D=3.875" ' ,----1 9554' ---14-1/2"HES X MP,D=3.813" TOP OF 4-1/2"LIAR H 9572' . t ; 9572' Hr X 4-1/2"BKR LNR/HGR FKR 4-1/2"TBG, 12.6#,L-80 BM,.0152 bpf,D=3.958" H 9576' 9576' 1—I4-1/2"WLEG,13=3.958" I IH ELM)TT NOT LOGGED 7"LNR,26#,L-80 BT-M.0383 bpf,D=6.276" —1 9748' I--4 , PERFORATION SUMMARY _ REF LOG: SAS ON 01/12/98 ANGLE AT TOP PERF: 58"a 10374' Note:Refer to Roduction DB for historical perf data SIZE SPF INTERVAL Opn/Sqz SHOT SOZ ` 12547' —I FISH:MLLED&PUSHED CEP(05/19/13) 2-7/8" 6 10374-10386 C 07/24/03 ` 2-3/4" 4 10500-10612 0 08/02/98 2-3/4" 4 10650-10935 0 08/02/98 ` 12692' —WFD 4-1/2"CIBP(GIM?) 2-3/4" 4 11315-11485 0 08/02/98 Ntib 2-3/4" 4 11540-11680 0 08/02/98 ` 2-3/4' 4 11715-12175 0 08/02198 2-3/4" 4 12205-12375 0 08/02/98 J0i111i' 2-3/4" 4 12400-12695 0 08/02/98 MID --I 12713' 1 1 TD —I 12805' 4-1/2"UsR, 12.6#,L-80 En-44,.0152 bpf,D=3.958" I—{ 12802' DATE REV BY CONSENTS - DATE REV BY COMMENTS RRUDFIOEBAY UNIT 03/30/75 RIG 51 ORIGINAL COMPLETION 08/26/13 RKT/JMD PULLED ROCK SCI (08/04/13) WELL: 02-07A 08/04198 N22E RWO 04/02/14 DW/PJC PULL PATCH(3/31/14) PERMIT N3:'1981070 02/24/11 MES 'RWO AR No: 50-029-20154-01 05/23/13 i t WJMD FISFt PUSHED CEP(05/19/13) SEC 36,T11N,R14E,1567'RC&1036'FWL 06/20/13 ATO/ND SET LOWER PATCH(06/14/13) 06/20/13 M5S/JMD R SCREEN/PATCH(06/16-17/13) BP Exploration(Alaska) TREE=• V`A.3LFEAD= — PROPOSCD 02-0 7 SAS.YNOTES: WELL ANGLE>70'@ 10466• 'ACTUATOR= NTIAL KB.ELE 58' BF.ELEV= ? KOP= ---i- 20"COND, H 100' —I) Max Angle= _"0_ 94#,N-40, I N 2208' -14-1/2 I-ES XNIP,D=3.813" Datum MD= D=19.124" GAS LET MANDRELS Datum TVD= 8800'SS ST' MD TVD DEV TYPE VLV LATCH PORT DATE: 13-3/8"CSG,72#,MN-80 BTRS,D=12.347" - 2737' 3 3719 3697 20 MMG DOME RKP 16 03/08/11 111 2 6652 6186 29 MMG SO RK 20 03/08/11 1 9215 8062 47 KBG2 DMY BK 0 02/22/11 5/8"X 7"BKR LW&HGR,ID=6.25" H 7270' 9-5/8"CSG,40#1 47#,N-80/RS-95, -1 ^ 'i• I— ` 1 MLLOUT WINDOW(02-07A) 7471'-7 D=8.835"/8.681" I I 9332' --I 41/2 HES X NP,13=3.813" Minimum ID = " Qe g X 9363' -7 X 4-1/2"I-ES TNT FKR,13=3.875" ' 9400' -14-1/2 HES X NP,ID=3.813" 4-1/2"1BG,12.6#,13CR 85 VAM TOP, H 9470' 1-- _0152 bpf,ID=3.958" 9485' H7 X 4-1/2"UNIQUE OVERSHOT 4-1/2"TUBING STUB (02/20/11) --I 9474' 0 9521' -17 X 4-1/2"BKR S-3 PKR,D=3.875" 9554' H4-1/2"HES X NP,D=3.813" TOP OF 4-1/2"LNER - 9572" _; 9572' -17"X 4-1/2"BKR LNR/HGR Pr<R 4-1/2"TBG,12.6#,L-80 BM,.0152 bpf,13=3.958" -I 9576' 9576' -I41/2"0/LEG,13=3.958" HELM)TT NOT LOGGED 7"LW,26#,L-80 BT-M,.0383 bpf,D=6.276" -1 9748' , TOC( /_/_) - X10000' -10000' H 3.70"DEPLOY WENT SLEEVE,D=3.00" N/?" t4 II bpf,D= " -1 ^10045' - -10030" H3-1/2"HES X NP,D=2.813" 4-1/2"WHIPSTOCK( / / ) -1 -10857' -10045' H 3-1/2"X 3-3/16"XO,D=2.786" 41/2"LNR 12.6#,L-80 BT-M,.0152 bpf,I)=3.958" - -12802' 3-1/4"LW #, bpf,13= ^11990' \ MLLOUT WINDOW(02-07B) -10857'---10957' PERFORATION SUNINARY \II FEF LOG: SWS ON 01/12/98 ANGLE ATTOP PERE "@__ Nbte:Refer to Production DB for historical perf data SIZE SPF INTERVAL Opn/Sqz SHOT SQZ 2-7/8" 6 10374-10386 S 07/24/03' / / -11990' -3-3/16"X 2-7/8"Xo,13=2.377" 2-3/4" 4 10500-10612 S 08/02/98 /_/_ 2-3/4" 4 10650-10935 S 08/02/98 / / H FSTD 11 2-7/8"LNR, #, , bpf,D= _._ " - -12875' Al DATE REV BY COMMENTS DATE REV BY CO/4434M PRUDHOE BAY UNIT 03/30175 RIG 51 ORIGINAL COMPLETION WELL: 02-07:• 08/04/98 N22E RWO PERMT No: 02/24/11 M6 RWO API No: 50-029-20154--" J4/24/14 JMD BI.1LT PROPOSED SEC 36,T1 1 N,R14E, 1567'FNL&1036'FWL BP Exploration(Alaska) A mar I- $ `—i o g c4i i $ 6 41 2 !'" �•� I g 3 II III I l'l I s s ♦ g1 pt f t 1 1 i 1. § A a NE u 6 C —.. I I Ili Ellin— 1 I I I i s 2 i °e a I '� cm! gM N , 4 C 1 _Q ° m 1 13 � I o f-�I 1 1 E I1 CI ���� n I II w I I W I O- 211 I + IIII III LJL >997 P 1 i r I 0 - 0 C > 1 J- if II i! 111 1 III III Zo _O e I U n E$ U §0 i > 1 1 III III I $ $ J 81 o 2n 111 En o a 1°3 V 1 W LL Z cos K C II N ; 111 I _ , • I L • o I1 !R II 011. 0 :.. 3 • I u J ♦ IF ■ I 11 e i W a I n i W . •• •• 3 Y 1 C O U 2 :>'• e P 1 IT L. L N II J HI IC3 i e x 1 m E,3 o O n I Z i ) : N I h b III a s rc 9 ll 1 III 11114"r NI . il IlliellEI ... a' ';:i .il M 1 1 a m .1 I '4",,„ 1 - g ;' 1 V i=, il. I I 1iii4 i 1'p p" ^ ~ O 1 51 [ I RECEIVED STATE OF ALASKA . OSKA OIL AND GAS CONSERVATION COM JUL Q 013 SION REPORT OF SUNDRY WELL OPERATIONS AOGCC 1.Operations Abandon Li Repair Well Li Plug Perforations U Perforate U Other L _Mill CIBP, Performed: Alter Casing ❑ Pull Tubing❑ Stimulate-Frac ❑ Waiver ❑ Time Extension❑ Set Straddle Change Approved Program ❑ Operat.Shutdown❑ Stimulate-Other ❑ Re-enter Suspended WeII❑ 2.Operator 4.Well Class Before Work: 5.Permit to Drill Number: BP Exploration(Alaska),Inc . Name: Development El Exploratory ❑ 198-107-0 • 3.Address: P.O.Box 196612 Stratigraphic❑ Service ❑ 6.API Number: Anchorage,AK 99519-6612 50-029-20154-01-00 • 7.Property Designation(Lease Number): 8.Well Name and Number: ADL0028308 PBU 02-07A ' 9.Logs(List logs and submit electronic and printed data per 20AAC25.071): 10.Field/Pool(s): To Be Submitted PRUDHOE BAY,PRUDHOE OIL • 11.Present Well Condition Summary: Total Depth measured 12805 feet • Plugs measured 10440 feet true vertical 9005.46 feet Junk measured See Attachment feet Effective Depth measured 12713 feet Packer measured See Attachment feet true vertical 9009.73 feet true vertical See Attachment feet Casing Length Size MD TVD Burst Collapse Structural None None None None None None Conductor 80 20"91.5#H-40 28-108 28-108 1490 470 Surface 2710 13-3/8"72#MN-80 27-2737 27-2736.99 5380 2670 Intermediate None None None None None None Production See Attachment See Attachment See Attachment See Attachment See Attachment See Attachment Liner See Attachment See Attachment See Attachment See Attachment See Attachment See Attachment Perforation depth Measured depth 10374-10386 feet 10500-10612 feet 10650-10935 feet 11315-11485 feet 11540-11680 feet 11715-12175 feet 12205-12375 feet 12400-12695 feet True Vertical depth 8981.01-8987.27 feet 9031.93-9043.46 feet 9039.53-9024.46 feet 9024.9-9014.16 feet 9013.44-9011.56 feet 9010.94-9009.24 feet 9009.97-9006.62 feet 9006.24-9010.44 feet Tubing(size,grade,measured and true vertical depth) See Attachment See Attachment See Attachment Packers and SSSV(type,measured and true vertical depth) See Attachment See Attachment See Attachment Packer None None None SSSV 12.Stimulation or cement squeeze summary: (y Intervals treated(measured): SCANM � 4� �P � y tJ} Treatment descriptions including volumes used and final pressure: 1� 13. Representative Daily Average Production or Injection Data Oil-Bbl Gas-Mcf Water-Bbl Casing Pressure Tubing Pressure Prior to well operation: 818 55962 29 0 1163 Subsequent to operation: 449 37334 16 0 1024 14.Attachments: 15.Well Class after work: Copies of Logs and Surveys Run Exploratory❑ Development gi • Service❑ Stratigraphic ❑ Daily Report of Well Operations X 16.Well Status after work: Oil Gas ❑ WDSPI1J GSTOR ❑ WINJ ❑ WAG ❑ GINJ ❑ SUSP ❑ SPLUG0 17.I hereby certify that the foregoing is true and correct to the best of my knowledge. Sundry Number or N/A if C.O.Exempt: N/A Contact Garry Catron Email Garry.Catronc BP.Com Printed Name Garry Catron Title PDC PE Signature fi C Phone 564-4424 Date 7/10/2013 V1-'f; RBDMS JUL 11 201,13 i,131I ( � Form 10-404 Revised 10/2012 � Submit Original Only S 02-07A 198-107-0 Junk Attachment SW Name MD Date Description 02-07A 12540 5/20/2013 MILL CIBP 02-07A 12692 3/3/2003 MILL CIBP 0 Packers and SSV's Attachment ADL0028308 SW Name Type MD TVD Depscription 02-07A PACKER 7270 6677.71 7" Top Packer 02-07A PACKER 9521 8217.76 4-1/2" Baker S-3 Perm Packer 02-07A PACKER 9572 8255.89 4-1/2" Top Packer 02-07A PACKER 10361 8915.09 4-1/2" KB Packer 02-07A PACKER 10390 8930.54 4-1/2" KB Packer Casing / Tubing Attachment ADL0028308 Casing Length Size MD TVD ! Burst Collapse CONDUCTOR 80 20" 91.5# H-40 28 - 108 28 - 108 1490 470 LINER 2478 7"26#L-80 7270 - 9748 6736.48 - 8455.98 7240 5410 LINER 3230 4-1/2" 12.6# L-80 9572 - 12802 8314.66 - 9005.6 8430 7500 PATCH 29 3-1/2"9.2#L-80 10361 - 10390 8973.86 - 8989.31 10160 10530 PRODUCTION 1363 9-5/8"47# R-S-95 27 - 1390 27 - 1390 8150 5080 PRODUCTION 1022 9-5/8"47#MN-80 1390 - 2412 1390 - 2412 6870 4760 PRODUCTION 3838 9-5/8"40#RS-95 2412 - 6250 2412 - 5849.33 6820 3330 • PRODUCTION 2472 9-5/8"47#R-S-95 6250 - 8722 5849.33 - 7742.78 8150 5080 SURFACE 2710 13-3/8" 72#MN-80 27 - 2737 27 - 2736.99 5380 2670 TUBING 9461 4-1/2" 12.6# 13Cr80 24 - 9485 24 - 8250.43 8430 7500 TUBING 101 4-1/2" 12.6#L-80 9475 - 9576 8243.31 - 8317.71 8430 7500 • • • Daily Report of Well Operations ADL0028308 ****WELL S/I ON ARRIVAL****(profile mod) R/U SLICKLINE & P/T 5/8/2013 ****CONT JOB ON 5-9-13**** ****CONT JOB FROM 5-8-13****(profile mod) PULLED 4-1/2" BKR EXCLUDER ROCK SCREEN FROM 9386' SLM/9400' MD. DRIFT W/20'x 3.70" DUMMY WHIPSTOCK TO 10,248' (possible dog leg) RUN 2' 1-7/8" STEM, 3.70" CENT, 2-1/2" S-BAILER TO 10, 400 'SLM(no sample) RUN 10'x 3.7 DUMMY WHIPSTOCK,W/3.50" LIB TO 10,201' SLM.(no impression on LIB) 5/9/2013 **** LEFT WELL SHUT IN,TURNED WELL OVER TO DSO. **** CTU #3 - 1.75" Coil Job Scope: Venturi rocks, Mill CIBP, Drift for straddle packer MIRU. Perform chain inspection, change packoffs. Complete weekly BOP tests on back deck. Good tests. Nipple up BOPS and MU Venturi BHA. RIH and tag down at 10505', PUH. Venturi down to 10505', appeared plug came free. Venturi plug down to 10587'. Unable to push deeper, POOH. 5/19/2013 ***Job continued on 5/20/13*** CTU #3 - 1.75" Coil Job Scope: Venturi rocks, Mill CIBP, Drift for straddle packer MU BKR milling BHA w/3.72" 3-bladed piranha mill & RIH. Tag down at 10508'. Mill/Push plug down to 12547'. Backream to 10,000'. RBIH for dry drift and tag at 12,540'. POOH. No unusual wear noticed on mill. MU packer drift assembly w/3.70" Bullnose. RIH and drift to 11,200'. No problems running past patch setting depth. POOH. Change packoff. RDMO. 5/20/2013 ***Job Complete*** ***WELL S/I ON ARRIVAL*** RAN 10'x3.70" DMY WHIP STOCK, SD @10242' SLM RAN 3.65"CENT, 5' STEM, 3.70" CENT, DEVIATE OUT @10573' SLM 5/22/2013 **CONT ON WSR 5/23/13*** ***CONT FROM WSR 5/22/13*** RAN 3.65" CENT 8'x1-7/8" STEM, 3.70" CENT, DEVIATED OUT @10539' SLM RAN KB PACKER DRIFT, MAX OD 3.70"x 60" LENGTH, DEVIATED OUT @10484' SLM 5/23/2013 ***WELL S/I ON DEPARTURE*** T/I/0=2400/400/200 (Swab valve replacement) Conducted PJSM; Verified barriers(MV+SSV, WV+Lateral) independently with LTT(PASS); With full safe-out in place, removed old 6" CIW swab and replaced w/b-cond 6" CIW valve. Torqued to API specs. PTd against SSV and WV with 300/5000psi for 5 min each(PASS). Bled to 0. 6/8/2013 ***Job complete*** T/I/O = 2400/480/250. Temp = SI. T& IA FLs (E-Line request). No AL. T FL @ 9626' (54' below 4.5" liner top) . IA FL @ 6652' (sta#2, 5/0). MV closed on arrival, cycled open DSO notified. 6/9/2013 SV, WV, SSV= C. MV= 0. IA, OA= OTG. NOVP. 23:30 hrs. *****COST PLACEHOLDER***** 6/12/2013 LABOR AND MACHINE COSTS FOR UPPER SECTION OF STRADDLE PATCH ***WELL SI ON ARRIVAL***(E-LINE - SET LOWER PACKER ELEMENT) INITIAL T/I/O = 0/500/300 PSI RIH W/ BAKER LOWER STRADDLE PACKER 6/13/2013 ***JOB CONTINUED ON 14-JUNE-2013*** T/I/0=2425/483/255 Temp=Sl Load & Kill pre E-line (Profile Modification) Spear in to TBG w/3 bbls of meth followed by 295 bbls of110*crude Wing shut swab shut ssv shut 6/13/2013 master open casing valves open to gauges Final Whp's=vac/499/291 • Daily Report of Well Operations ADL0028308 ***JOB CONTINUED FROM 13-JUNE-2013**" (E-LINE -SET LOWER PACKER ELEMENT) SET LOWER PATCH ELEMENT. TOP OF PATCH @ 10390' . PULL UP JEWELRY LOG FROM 10383'TO 9100'. POOH. FINAL T/I/O = 160/500/300 PSI ***JOB COMPLETE -WELL SI UPON DEPARTURE- PAD OP NOTIFIED OF 6/14/2013 STATUS*** ***WELL SHUT IN ON ARRIVAL***(profile mod) DRIFTED w/3.70 x 31' DMY KB DRIFT&TAGGED LOWER ANCHOR @ 10,375' SLM SET BAKER 45 KB UPPER PATCH SECTION IN LOWER ANCHOR @ 10,372' SLM 6/16/2013 ***CONTINUED ON 6/17/13 WSR*** ***JOB CONTINUED FROM 6/16/13*** (profile mod) SET4-1/2"X-LOCk W/ BAKER ROCK SCREEN@ 9407' SLM (9400' MD) RAN 4 1/2" CHECK-SET TO ROCK SCREEN @ 9407' SLM -SHEARED, GOOD SET 6/17/2013 ***WELL TURNED OVER TO DSO*** TREE= 5 X 7 FMC - WEL.U-EAD= FNC - SAFETY NOTES: WELL AN(IE>70°fp 10466' . . _ 02 7 ACTUATOR= BAKER IIITIAL KB.81 58' BF.ELB/= ? I 11 KOP= _? Max Angie ..LL. 99 r'10698' ' ' L 2208' H4-1/2 I-ES X NP D=3.813" I Datum R = D 10203' Datum TVD= 8800'SS GAS LFF MANDRELS Imo"CONDUCTOR,94#,N-40,D=19.124" H 100' ST MD ND DEV TYPE VLV LATCH FORT GATE 3 H 273 13318"CSG,72#,MN 80 MRS,D=12.347" 2737' 3719 3697 20 WAG DONE RCP 16 03108/11 2 6652 6186 29 WAG SO RK 20 03/08/11 I9-5/8"X 7"BKR LIP&HGR,0=6.25" H 7270' 1 9215 8062 47 KBG2 OFAY BK 0 02/22/11 MLLOUT VVINDOW(02-07A) 7471'-?' I 9-5/8"CSG,40#/47#,N-80/RS-95, —I 7471' - D=8.835"18.681" I /-----I 9332' H4-1121 X NP,D=3.813" I Minimum ID = 2.45" @ 10390' ELM z X-- I ems PK ' H7 -1/7'FESTNTRD=3.875" I 4-1/2" BOT FLO GUARD LOWER PKR I 9400' H4-1/2 I-ES X MP ID=3.813" I P`Ii4 8400• - 112 BKR ROCK SCREEN(06/17/13)4-1/2"TBG,12.6#,13CR-85 VAM TOP, —I 9470 I 4 .0152 bpf,D=3.958' I4-1/7 TW14G STUB (02120/11) H 9474' 9485' H7X4-1/2'UNIQUE OVERSHOT I g i 9521' H 7 X 4-1/2'BKR S-3 PKR,D=3.875" I ' 8664• H4-1/2"HES X NP,D=3.813" I TOP OF 4-1/2"UNER H 9572' I 9572' Hr X 4-1/2"BKR LNRMGR PKR I 1 4-1/2"TBG,12.6#,L-80 BM,.0152 bpf,D=3.958' H 9576' 9576' H4-1/2"WLEG,D=3.958" I I H ELM)TT NOT LOGGED I I r LNR 26#,L-80 BT--M,.0383 bpf,0=6276" H 9748' I— A ■ 1 10361'ELM 14-1/7 BKR 45 KB UPPER PATCH,D=2.972' PERFORATION SUMMARY (06/16/13) REF LOG: SWS ON 01/12/98 ANGLE AT TOP PERF: 58° q 10374' 1 10390'ELM 14-1/2"BOT FLO GUARD L(YNER STRADDLE Note:Refer to Production CB for historical pert data '= PKR,D=2.45"(06/14/13) SIZE SPF INTERVAL Opn/Sqz SHOT SQZ ` 12647' H FISIt MLLE!&PUSHED CBP(05/19/13) 2-7/8" 6 10374-10386 C 07/24/03 ` 2-3/4" 4 10500-10612 0 08/02/98 ` 12692' WFD 41/2"GBP(GTND} I 2-3/4" 4 10650-10935 O 08/02/98 ` 2-3/4" 4 11315-11485 0 08/02/98 2-3/4" 4 11540-11680 0 08/02/98 ` 2-314" 4 11715-12175 0 08/02/98 ■2-3/4" 4 12205-12375 0 08102/98 ......�' 2-3/4" 4 12400-12695 0 08/02/98 PBTD 12713' '!o TD H I 12805' I 1 4-1/2"LNR 12.6#,L-80 BT-M,.0152 bpf,D=3.958" H 12802' I GATE REV BY 001WIENTS GATE REV BY COMuUJTS PRUCHOE BAY UNIT 03/30/75 RIG 51 ORIGINAL COMPLETION 05/23/13 JTG/JID PULLED ROCK SCRN(05/08/13) WELL.: 02-07A 08/04/98 Nt22E /711110 05/23/13 TTR/JND FISlt NIU_HYPISI-ED CBP(05/19/13) PERMIT No: 1981070 02124/11 NTES RWO 106/20/13 ATO/JMD SET LOWER PATCH(06/14/13) AR No: 50-029-20154-01 03/09/11 BSE/PJC GLV GO(03/08111) 06/20/13 MSS/AD SET ROCK SCRWUIPPER PATCH(06/16-17/13) SW 36,T11N,R14E,1567'FNL&1036'PM_ 03/10/11 M-VPJC FI4AL DRLG CORRECTION 01/31/13 RKI7JND CO ROCK SCRN(01/28/13) BP Exploration(Alaska) OPERABLE: Producer 02 -07A (PTD #1981071AxOA manageable by bleeds • Page 1 )f 4 Regg, James B (DOA) From: AK, D &C Well Integrity Coordinator [ AKDCWelllntegrityCoordinator @bp.com] 1L,� I !c • Sent: Thursday, December 01, 2011 9:39 AM To: Regg, James B (DOA); Maunder, Thomas E (DOA); Schwartz, Guy L (DOA); AK, OPS FS1 OSM; AK, OPE FS1 Facility OTL; AK, OPS FS1 DS Ops Lead; AK, OPS FS1 DS5 Operator; AK, OPS PCC EOC TL; AK, CC Well Services Operations Team Lead; AK, D &C Wireline Operations Team Lead; Cismoski, Doug A; Danie Ryan; G GPB FS1 DS; Russell, James; AK, RES GPB East Wells Opt Engr Cc: King, Whitney; Olson, Andrew Subject: OPERABLE: Producer 02 -07A (PTD #1981070) IAxOA manageable by bleeds All, An OA Repressurization Test was performed on producer 02 -07A (PTD #1981070) from 11/25/11 - 11/30/11 and the OA build up rate was —26 psi /day making the well manageable by bleeds. The well is reclassified as Operable. Thank you, Mehreen Vazir (Alternate: Gerald Murphy) Well Integrity Coordinator BP Alaska Drilling & Wells s.‘ !, Well Integrity Office: 907.659.5102y' ) Email: AKDCWelllntegrityCoordinator @BP.com From: AK, D &C Well Integrity Coordinator Sent: Saturday, November 26, 2011 4 :51 PM To: 'Regg, James B (DOA)'; 'Maunder, Thomas E (DOA)'; 'Schwartz, Guy L (DOA)'; AK, OPS FS1 OSM• AK, OPS FS1 Facility OTL; AK, OPS FS1 DS Ops Lead; AK, OPS FS1 DS5 Operator; AK, OPS PCC EOC TL; AK, D &C Well Services Operatic s Team Lead; AK, D &C Wireline Operations Team Lead; Cismoski, Doug A; Daniel, Ryan; G GPB FS1 DS; Russell, James; AK, RE PB West Wells Opt Engr; AK, RES GPB East Wells Opt Engr Cc: AK, D &C Well Integrity Coordinator; King, Whitney; LeBaron, Michael J; Aren., Jon (NORTHERN SOLUTIONS LLC) Subject: FW: UNDER EVALUATION: Producer 02 -07A (PTD #1981070) S = ained OA Pressure Above MOASP (corrected IA pressure) All, The previous e -mail incorrectly stated the well - ad pressures. The correct pressures should read 1160/1550/1060 for the tubing /IA/OA. The I eressure of 11550 was a mistake. Thank you, Gerald Murphy BPXA Well Integrity Coordin - sr r From: AK, D &C Well Integrity Coordinator Sent: Saturday, November 26, 2011 4:23 PM To: 'Regg, James B (DOA)'; 'Maunder, Thomas E (DOA)'; 'Schwartz, Guy L (DOA)'; AK, OPS FS1 OSM; AK, OPS FS1 Facility OTL; AK, OPS 12/1/2011 FW: UNDER EVALUATION: Producer 02- 0,(PTD #1981070) Sustained OA Pres. Above... Page 1 of 1 Regg, James B (DOA) From: AK, D &C Well Integrity Coordinator [ AKDCWelllntegrityCoordinator @bp.com] / / Sent: Saturday, November 26, 2011 4:51 PM J I To: Regg, James B (DOA); Maunder, Thomas E (DOA); Schwartz, Guy L (DOA); AK, OPS FS1 OSM; AK, OPS FS1 Facility OTL; AK, OPS FS1 DS Ops Lead; AK, OPS FS1 DS5 Operator; AK, OPS PCC EOC TL; AK, D &C Well Services Operations Team Lead; AK, D &C Wireline Operations Team Lead; Cismoski, Doug A; Daniel, Ryan; G GPB FS1 DS; Russell, James; AK, RES GPB West Wells Opt Engr; AK, RES GPB East Wells Opt Engr Cc: AK, D &C Well Integrity Coordinator; King, Whitney; LeBaron, Michael J; Arend, Jon (NORTHERN SOLUTIONS LLC) Subject: FW: UNDER EVALUATION: Producer 02 -07A (PTD #1981070) Sustained OA Pressure Above MOASP (corrected IA pressure) Attachments: Producer 02 -07A (PTD #1981070) TIO Plot.doc All, The previous e-mail incorrectly stated the wellhead pressures. The correct pressures should read 1160/1550/1060 for the tubing /IA /OA. The IA pressure of 11550 was a mistake. Thank you, Gerald Murphy BPXA Well Integrity Coordinator From: AK, D &C Well Integrity Coordinator Sent: Saturday, November 26, 2011 4:23 PM To: 'Regg, James B (DOA)'; 'Maunder, Thomas E (DOA)'; 'Schwartz, Guy L (DOA)'; AK, OPS FS1 OSM; AK, OPS FS1 Facility OTL; AK, OPS FS1 DS Ops Lead; AK, OPS FS1 DS5 Operator; AK, OPS PCC EOC TL; AK, D &C Well Services Operations Team Lead; AK, D &C Wireline Operations Team Lead; Cismoski, Doug A; Daniel, Ryan; G GPB FS1 DS; Russell, James; AK, RES GPB West Wells Opt Engr; AK, RES GPB East Wells Opt Engr Cc: AK, D &C Well Integrity Coordinator; King, Whitney; LeBaron, Michael J; Arend, Jon (NORTHERN SOLUTIONS LLC) Subject: UNDER EVALUATION: Producer 02 -07A (PTD #1981070) Sustained OA Pressure Above MOASP All, Producer 02 -07A (PTD #1981070) has confirmed sustained OA casing pressure above MOASP. The wellhead pressures were tubing /IA/OA equal to 1160/11550/1060 on 11/23/2011 The well has been reclassified as Under Evaluation. The well may remain online while work is conducted to attempt to restore integrity. Pan forward: eA- ,� 1. DHD: Outer Annulus Repressurization Test (OART) 2. Pending results of OART, Wellhead perform PPPOT -IA M3 i' = 53 () ,. A TIO plot and wellbore schematic have been included for reference. _f' = 1066J- «Producer 02 -07A (PTD #1981070) TIO Plot.doc» — Please call if you have any questions or concerns. v Thank you, Gerald Murphy (alt. Mehreen Vazir) Well Integrity Coordinator Office (907) 659 -5102 Cell (907) 752 -0755 Pager (907) 659 -5100 Ext. 1154 11/29/2011 PBU 02-07A PTD #1981070 11/26/2011 TIO Pressures Plot Well: 02-07 4,000 3,000 • • T bg --E- 2,000 —A— OA 00A —41- 000A On I\ waiss-mme•-••••••••••••••-wileemees„,..j imuFati . 1,000 09/27/11 09/10/11 09/24/11 10/00/11 10/22/11 11/05/11 11/19/11 TREE = 5 X7 FMC e ACTUA OR = BAKER �J ® SAFETY NOTES: W ELL ANGLE > 70° @ 10466' KB. ELEV = 58' j BF. ELEV = ? KOP = ? Max Angle = 99° @ 10698' 1 I 2208' H 4 -1/2 HES X NIP, ID = 3.813" I Datum MD = 10203' Datum TV D = 8800' SS GAS LIFT MANDRELS 20" CONDUCTOR, 94 #, N-40, ID = 19.124" I 100' ST MD TVD DEV TYPE VLV LATCH PORT DATE 113 -3/8" CSG, 72 #, MN -80 BTRS, ID = 12.347" I--L 2737' 3 3719 3697 20 MMG DOME RKP 16 03/08/11 2 6652 6186 29 MMG SO RK 20 03/08/11 l I9 -5/8" X 7" BKR LTP & HGR, ID = 6.25" H 7270' I - 1_ 9215 8062 47 _ KBG2 CM_ BK 0 02/22/11 C 3to rc MILLOUT WINDOW (02 -07A) 7471' - ?' 9 -5/8" CSG , 40 # / 47 #, N-80 / RS -95, --I 7471' I— - ID = 8.835" / 8.681" I I 9332' H 4 -1/2 HES X NIP, ID = 3.813" I Minimum ID = 3.813" @ 2208' S L 9363' I-1 X 4 -1/2" HES TNT PKR, 1D = 3.875" I 4 -1/2" HES X NIPPLE A I 9400' I- 14 -1/2 HES X NIP, ID = 3.813" I 4 -1/2" TBG, 12.6 #, 13CR -85 VAM TOP, -I 9470' I--- 9400' I-" 4 -1/2" ROCK SCREEN .0152 bpf, ID = 3.958" w / 4-1/2" X LOCK EQ SUB (10/3/11) 4 -1/2" TUBING STUB (02/20/11) H 9474' � ,-----. 1 9485' H 7 X 4 -1/2" UNIQUE OVERSHOT I Z 9521' H 7 X 4 -1/2" BKR S -3 PKR, ID = 3.875" I I 9554' H 4 -1 /2" HES X NIP, ID = 3.813" I ITOP OF 4 -1/2" LINER H 9572' I 9572' I-1 " X 4 -1/2" BKR LNR/HGR PKR I 4 -1/2" TBG, 12.6 #, L -80 IBM, .0152 bpf, ID = 3.958" H 9576' 9576' H 4 -1/2" WLEG, ID = 3.958" I I H E LMD TT NOT LOGGED I 17" LNR, 26 #, L -80 IBT -M, .0383 bpf, ID = 6.276" H 9748' PERFORATION SUMMARY _ REF LOG: SWS ON 01/12/98 ANGLE AT TOP PERF: 58° @ 10374' 10470' H BKR CIBP (07/24/03) I Note: Refer to Production DB for historical perf data SIZE SPF INTERVAL Opn /Sqz DATE )( % 2 -7/8" 6 10374 - 10386 0 07/24/03 ` 2 -3/4" 4 10500 - 10612 0 08/02/98 ■ 12692' -I WFD 4-1/2" CIBP (CTv1D) I 2 -3/4" 4 10650 - 10935 0 08/02/98 ` 2 -3/4" 4 11315 - 11485 0 08/02/98 ` 2 -3/4" 4 11540 - 11680 0 08/02/98 SP 4 11715 - 12175 0 08/02/98 2 -3/4" 4 12205 - 12375 0 08/02/98 '.i►► 2 -3/4" 4 12400 - 12695 C 08/02/98 I PBTD I-I 12713' . �► ! * �� I TD I 12805' 14 -1/2 " LNR, 12.6 #, L -80 IBT -M, .0152 bpf, ID = 3.958" H 12802' I DATE REV BY COMMENTS DATE REV BY COMMENTS { PRUDHOE BAY UNIT 03/30/75 RIG 51 ORIGINAL COMPLETION 03/26/11 BSE/PJC PULL JNK CATCHER (02/21/11) WELL: 02 -07A 08/04/98 N22E RWO 03/26/11 BSE/PJC BAIL SLUGGITS (03/09/11) PERMIT No: '1981070 02/24/11 N7ES RWO 03/26/11 BSE/PJC PULL WRP (03/11/11) API No: 50- 029 - 20154 -01 03/04/11 PJC DRLG DRAFT CORRECTION 10/10/11 DLW/ PJC SET ROCK SCRN (10/3/11) SEC 36, T11 N, R14E, 1036' FWL & 1570' FNL - 03/09/11 BSE/PJC GLV C/O (03/08/11) 03/10/11 WH/PJC FINAL DRLG CORRECTION BP Exploration (Alaska) • • bp BP Exploration (Alaska) Inc. Attn: Well Integrity Coordinator, PRB -20 Post Office Box 196612 0 Anchorage, Alaska 99519 -6612 August 22, 2011 k r 7 Mr. Tom Maunder Alaska Oil and nd Gas Conservation Commission ���, / 333 West 7 Avenue � ,fl7F Anchorage, Alaska 99501 8 We tms Co Subject: Corrosion Inhibitor Treatments of GPB DS -02 4nos uu 17 Dear Mr. Maunder, Enclosed please find multiple copies of a spreadsheet with a list of wells from GPB DS- 02 that were treated with corrosion inhibitor in the surface casing by conductor annulus. The corrosion inhibitor is engineered to prevent water from entering the annular space and causing external corrosion that could result in a surface casing leak to atmosphere. The attached spreadsheet represents the well name, API and PTD numbers, top of cement depth prior to filling and volumes of corrosion inhibitor used in each conductor. As per previous agreement with the AOGCC, this letter and spreadsheet serve as notification that the treatments took place and meet the requirements of form 10 -404, Report of Sundry Operations. If you require any additional information, please contact me or my alternate, Gerald Murphy, at 659 -5102. Sincerely, Mehreen Vazir BPXA, Well Integrity Coordinator • • BP Exploration (Alaska) Inc. Surface Casing by Conductor Annulus Cement, Corrosion inhibitor, Sealant Top -off Report of Sundry Operations (10 -404) DS -02 Date: 07/21/2011 Vol. of Corrosion Initial top of cement Final top of Cement top off Corrosion inhibitor/ Well Name PTD # API # cement pumped cement date inhibitor sealant date ft bbls ft na gal 02-01B 1971400 500292044201 Sealed NA Sealed N/A NA NA 02 -02A 1971680 500292007401 5' NA 5' N/A 74.80 5/20/2011 02 -03B 2002170 500292007702 38' 11.0 4" 7/13/11 3.40 7/21/2011 02 -04A 1961580 500292006401 0.2 NA 0.2' N/A 1.70 4/27/2011 02 -05A 2030820 500292008101 4.5' NA 4.5' N/A 68.00 5/19/2011 02 -06B 2040850 500292008602 6' NA 6' N/A 20.40 6/2/2011 02 -07A 1981070 500292015401 Sealed NA Sealed N/A NA NA 02 -08B 1980950 500292015502 Sealed NA Sealed N/A NA NA 02 -09C 2071390 500292015303 Sealed NA Sealed N/A NA NA 02 -10B 2000640 500292016302 Sealed NA Sealed N/A NA NA 02 -11A 1981260 500292027301 Sealed NA Sealed N/A NA NA 02 -12B 2070580 500292027702 Sealed NA Sealed N/A NA NA 02 -13B 2012430 500292043302 Sealed NA Sealed N/A NA NA 02 -14A 2031250 500292044601 Sealed NA Sealed N/A NA NA 02 -15A 1960420 500292044701 Sealed NA Sealed N/A N/A NA 02 -16C 2070870 500292044803 Sealed NA Sealed N/A NA NA 02 -17B 2051300 500292045302 Sealed NA Sealed N/A NA NA 02 -18B 2061860 500292045402 Sealed NA Sealed N/A NA NA 02 -19 1811860 500292069300 Sealed NA Sealed N/A NA NA 02 -20 1820290 500292072100 Sealed NA Sealed N/A NA NA 02 -21A 2010990 500292078101 Sealed NA Sealed N/A NA NA 02 -22B 2100520 500292074002 Sealed NA Sealed N/A NA NA 02 -23A 2000530 500292079501 0.5 NA .5' N/A 5.10 5/19/2011 02 -24A 2040300 500292074401 0.5 NA .5' N/A 3.40 5/19/2011 02 -25A 2080910 500292076601 0.2 NA .2' N/A 0.85 5/19/2011 02 -26C 2050190 500292077403 0.2 NA .2' N/A 0.85 5/19/2011 02 -27A 1990930 500292199401 12.5' 8.5 3" 7/8/11 1.70 7/12/2011 02 -28A 2041640 500292201201 Sealed Sealed N/A NA NA 02 -29C 2040510 500292201103 65' Top Plate N/A NA NA 02 -30B 2001260 500292220202 Sealed NA NA N/A NA NA 02 -31A 1990150 500292222701 1.5' 1.5' N/A 11.05 5/18/2011 02 -326 2020230 500292220902 1.1' 1.1' N/A 5.10 5/19/2011 02 -336 2090450 500292221402 1' 1' N/A 8.50 6/1/2011 02 -346 2100290 500292223402 0.8' 0.8' N/A 5.10 5/18/2011 02 -356 2060020 500292222202 1.5' 1.5' N/A 10.20 6/1/2011 02 -36A 2100780 500292287701 19.6' 11.5 5" 7/8/11 2.55 7/12/2011 02 -37 1961750 500292271700 0.1 0.1 N/A 0.85 5/18/2011 02 -38 1961610 500292270800 1.5' 1.5' N/A 15.30 5/18/2011 02 -39A 1971100 500292272100 1.5' 1.5' N/A 11.90 5/18/2011 02 -40 2071620 500292337700 2.9' 2.9' N/A 25.5 5/18/2011 _. STATE OF ALASKA RECEIVED): D: ALAS- AND GAS CONSERVATION COMMIS L 1� REPORrOF SUNDRY WELL OPERA NS MAR I Zit 1. Operations Performed: Aintka Evil sl 68S CO "iS, Cenlinkaa ❑ Abandon ® Repair Well ❑ Plug Perforations ❑ Stimulate ❑ Re -Enter Suspend eud p ❑ Alter Casing ® Pull Tubing ❑ Perforate New Pool ❑ Waiver ❑ Other '' ❑ Change Approved Program ❑ Operation Shutdown ❑ Perforate ❑ Time Extension 2. Operator Name: 4. Well Class Before Work: 5. Permit To Drill Number. BP Exploration (Alaska) Inc. ® Development ❑ Exploratory 198 - 107 3. Address: ❑ Service ❑ Stratigraphic 6. API Number: P.O. Box 196612, Anchorage, Alaska 99519 - 6612 . 50 - 029 - 20154 - 01 - 00 7. Property Designation: 8. Well Name and Number: ADL 028308 " t PBU 02 - 07A 9. Field / Pool(s): w Prudhoe Bay Field / Prudhoe Bay Oil Pool 10. Present well condition summary Total depth: measured 12805 feet Plugs (measured) 9550 / 10470 feet true vertical 9005 feet Junk (measured) 12692 Effective depth: measured 12713 feet Packer: (measured) 9363 / 9521 feet true vertical 9009 feet Packer: (true vertical) 8164 / 8277 feet Casing Length Size MD TVD Burst Collapse Structural Conductor 100' 20" 100' 100' Surface 2736' 13 -3/8" 2736' 2736' 5380 2670 Intermediate 7471' 9 -5/8" 7471' 6918' 5750 3090 Production Liner 2478' 7" 7270' - 9748' 6736' - 8456' 7240 5410 3230' 4-1/2' 9572' - 12802' 8315' - 9006' 8430 7500 Perforation Depth: Measured Depth: 10374' - 12695' (below plugs) True Vertical Depth: 8981' - 9010' (below plugs) Tubing (size, grade, measured and true vertical depth): 4 12.6# 13Cr - 9485' MD 8250' TVD 4 12.6# L - 80 9474' - 9576' MD 8243' - 8318' Tvo Packers and SSSV (type, measured and true vertical depth): 7" x 4 HES TNT Packer 9363' MD 8164' TVD 7" x 4-1/2" BKR 'S -3' Packer 9521' MD 8277' TVD 11. Stimulation or cement squeeze summary: Intervals treated (measured): MA Z1111 Treatment description including volumes used and final pressure: Set plug. Cut and pulled 4 - 1/2" tubing from 9480'. Dress off tubing stub at 9475'. Ran new 4 chrome tubing. 12. Representative Daily Average Production or Injection Data Oil-Bbl Gas -Mcf Water -Bbl Casing Pressure Tubing Pressure Prior to well operation: 0 0 0 0 10 Subsequent to operation: 0 0 0 0 50 13. Attachments: ❑Copies of Logs and Surveys run 14. WeII Class after work: ❑ Exploratory - ® Development ❑ Service ❑ Stratigraphic IN Daily Report of Well Operations ® Well Schematic Diagram 15. Well Status after work: ❑ GINJ -e ® Oil CI SUSP CI WDSPL ❑ Gas ❑ GSTOR ❑ SPLUG ❑ WAG ❑ WINJ 16. I hereby certify that the foregoing is true and correct to the best of my knowledge. Sundry Number or N/A if C.O. Exempt: Contact Wilmer Hoffman, 564 -4592 N/A Printed Name Elizabeth Barker Title Drilling Technologist �(jei Prepared ar Name/Number er, 56 - 56 Signature �� CG Phone 564-5674 Date���a(1�f Elizabeth Barker, 564 -5674 Form 10-404 Revised 10 /PTO I) S MAR 3 1 101 ubmit Ori final Only 2 1 4 ., 32bn /2,*(2/ Pr Rig Workover) • History (Pre 02 07A Well s y ( g ) Date Summary 4/25/2010 PPPOT -T: Stung into test port (1000 psi), bled to 0 psi. Functioned LDS, all moved freely (2.5 "). Pumped through void, good returns. Pressured void to 5000 psi for 30 min test, lost 100 psi in 15 min, lost 0 psi in second 15 min (PASS). Bled void to 0 psi. PPPOT -IC: Stung into test port (400 psi), bled to 0 psi. Functioned LDS, all moved freely (2.5 "). Pumped through void, good returns. Pressured void to 3500 psi for 30 min test, lost 0 psi in 30 min (PASS). Bled void to 0 psi. 1/5/2011 PPPOT -T : RU 2 HP BT onto THA 150 psi bled to 0 psi, flush void until clean returns achieved. Pressured to 5000 psi for 30 minute test, 5000/ 15 minutes, 4950/ 30 minutes. Bleed void to 0 psi, RD test equipment, re- installed Alemite caps. Cycle and torque LDS "Standard" all were in good working an visual condition. PPPOT -IC : RU 2 HP bleed tools onto IC test void 50 psi bled to 0 psi , flush void until clean returns achieved. Pressured to 3500 psi for 30 minute test, 3500/ 15 minutes, 3500/ 30 minutes. Bleed void to 0 psi, RD test equipment, re- installed Alemite caps. Cycle LDS "Standard" all moved with no problems 1/31/2011 PULLED 4 -1/2 BAKER SINGLE SET PATCH (Missing 2 elements) FROM 9,320' MD. RAN 4 -1/2" BLB, 3.69" 2 - PRONG WIRE GRAB TO 9,500' SLM (No recovery). PULLED P -PRONG FROM 2 -7/8" PLUG BODY (Nipple reducer) @ 9,554' MD. PULLED 4 -1/2" NIPPLE REDUCER W/ 2 -7/8" PLUG BODY FROM 9,554' MD. (Plug body contained 1 element from patch, nipple reducer missing 5 pieces of pkg & 1 steel nubbin). RAN 4 -1/2" BLB, 3.50" G -RING TO FLAG @ 9,540' SLM (LRS pumped 2 bpm during drift, no issues). DRIFT TO 9,540' SLM / 9,554' MD W/ 3.78" DUMMY WFD WRP (No issues). CURRENTLY IH W/ HES DPU, 4 -1/2" WFD WRP @ 9,536' SLM / 9,550' MD (Waiting for dpu to stroke). 2/1/2011 CMIT Tx IA 3500 psi PASSED , MIT OA 2000 psi PASSED Rigged up to tree cap and pumped 19.7 bbls crude to pressure T /IA to 3500 psi. T /IA lost 100/0 psi in 15 min's, 0/0 psi in 2nd 15 min's, for a total loss of 100/0 psi in 30 min's. Bleed TxIA psi down bleed back aprox. 14 bbls Pumped 13.1 bbls of 50* crude down OA to reach 2000 psi for MIT OA 1st test 1st 15 min lost 160 psi 2nd 15 min lost 80 psi for a total of 140 psi in 30 min RE -psi w /.1 bbl 2nd test 1st 15 min lost 40 psi 2nd 15 min lost 0 psi for a total of 40 psi in 30 min bleed back aprox. 1 bbl S -Line on well on dep. Wing shut swab shut ssv shut master open casing valves open to gauges. 2/1/2011 SET 4 -1/2" WFD WRP (3.77" max od / 3.77' = oal) @ 9,550' MD (Center element). LRS PERFORMED SUCCESSFUL CMIT T x IA TO 3500 PSI. LRS PERFORMED SUCCESSFUL MIT -OA TO 2000 PSI. DUMP BAILED -1 -1/2 BAGS OF SLUGGITS ON 4 -1/2" WFD WRP @ 9,550' MD. SET 4 -1/2" JUNK CATCHER (3.75" max od / 110" = oal) @ 9,538' MD. 2/4/2011 RAN 3.65" SCP POWER CUTTER TO 9480', CUT FIRST FULL JOINT ABOVE PACKER AS PER PROGRAM. U -TUBE OF PRESSURE NOTICED AFTER CUT. LIGHTLY TAGGED WRP PLUG AT 9535' TUBING TALLY DEPTH. 2/6/2011 CMIT T x IA to 1000 psi. FAILED. Spear into tbg w/ 5 bbls neat meth followed by 865 bbls 1% KCL to circ• out wellbore. Pump 150 bbls diesel down tbg. RU u -tube line. U -tube diesel from tbg to IA for freeze protect. Pumped 2.7 bbls down IA to pressure up IA and tubing to 1000 psi. Passed on 4th attempt. Lost 23 psi from IA. Lost 23 psi from tubing in 1st 15 minutes. Lost 24 psi tubing, Lost 23 psi from IA in 2nd 15 minutes. Bleed pressure down to 0 psi. Freeze Protected 02 -08 tubing and flowline. Pumped 5 bbls neat methanol and 28 bbls crude down flowline. Had IGV closed pressured up flowline to 1500 psi. Pumped 38 bbls crude down tubing. 2/8/2011 CMIT -TxIA PASSED to 1000 psi. Pumped 4 bbls Diesel down IA to reach test pressure. Loss of 5 psi 1st 15 min, Loss of 0 psi 2nd 15. Page 1 of 2 . • 02 -07A Well History (Pre Rig Workover) Date Summary 2/11/2011 Verified barriers, removed tree cap attached lubricator /BPV on tree, pressure tested lubricator 300 psi (pass) 3500 psi (pass). Set 5 -1/8" FMC IS -A BPV # 538 thru tree, 1 -2' ext. used...tag @ 95 ". Removed lubricator installed tree cap with new 0-ring, pressure tested cap to 500 psi (pass). 2/15/2011 Maintained open bleed on OA during entire operation. Removed blind flange on OA. VR plug was already installed. Installed 3 1/8 FMC model 120 valve and torqued to spec. Tested against VR plug to 500/5000 psi. Both tests passed. Bled off pressure and pulled VR plug. Installed blind flange on valve and tested against gate to 3500 psi for 5 min. Good test. Went to opposite side of OA and installed VR plug. Removed FMC model 75 gate valve and installed 3 1/8 companion flange with needle valve. Torqued to spec and tested to 3500 psi. Test passed. Bled pressure and turned well over to operator. Page 2 of 2 TREE = 5 X7 FMC WELLHEAD = FMC • SAFETY NA: WELL ANGLE > 70° @ 10466' 7A = BAKER 02-0 KB. ELEV = 58' BF. ELEV = ? 1 i KOP= Max Angle = 99° @ 10698' ' I I 2208' 114 -1/2 HES X NIP, ID = 3.813" I Datum MO = 10203' Datum ND = 8800' SS GAS LIFT MANDRELS 20" CONDUCTOR, 94 #, N -40, ID = 19.124" H 100' ST MD TVD DEV TYPE VLV LATCH PORT DATE 13 -3/8" CSG, 72 #, MN -80 BTRS, ID = 12.347" I---I 2737' 3 3719 3697 20 MMG DOME RKP 16 03/08/11 2 6652 6186 29 MMG SO RK 20 03/08/11 19 -5/8" X 7" BKR LTP & HGR, ID = 6.25" I 7270' 1 9215 8062 47 KBG2 DMY BK 0 02/22/11 I' MILLOUT WINDOW (02 -07A) 7471' - ?' 9 -5/8" CSG , 40 # / 47 #, N -80 / RS -95, —1 7471' 1— ID= 8.835 "/8.681" i 9332' 114 -1/2 HES X NIP, ID = 3.813" I Minimum ID = 3.813" @ 2208' g � 9363' 1 -17 X 4 -1/2" HES TNT PKR, ID = 3.875" I 4 -1/2" HES X NIPPLE • I 9400' 1 -14 -1/2 HES X NIP, ID = 3.813" I 4 -1/2" TBG, 12.6 #, 13CR -85 VAM TOP, —1 9470' 1-- \ .0152 bpf, ID = 3.958" I l 9485' I--17 X 4-1/2" UNIQUE OVERSHOT 1 14 -1/2" TUBING STUB (02/20/11) I-1 9474' 9521' 117 X 4 -1/2" BKR S -3 PKR, ID = 3.875" I 9538' H4 -1/2" JUNK CATCHER (02 /01/11) 1 ?? I - I SLUGGITS (02/01 /11) I 9550' H4 -1/2" WRP(02/01/11) 1 1 9554' H4 -1/2" HES X NIP, ID = 3.813" 1 (TOP OF 4 -1/2" LINER I--I 9572' . 9572' 1-1 7" X 4 -1/2" BKR LNR/HGR PKR 1 a ii 1 4-1/2" TBG, 12.6 #, L -80 IBM, .0152 bpf, ID = 3.958" 1-1 9576' 9576' 114 -1/2" WLEG, ID = 3.958" 1 I I-1 ELMD TT NOT LOGGED 1 7" LNR, 26 #, L -80 IBT -M, .0383 bpf, ID = 6.276" H 9748' IL PERFORATION SUMMARY REF LOG: SWS ON 01/12/98 ANGLE AT TOP PERF: 58° @ 10374' 10470' 1-1 BKR CIBP (07/24/03) Note: Refer to Production DB for historical perf data SIZE SPF INTERVAL Opn /Sqz DATE // ` 2 -7/8" 6 10374 - 10386 C 07/24/03 2 -3/4" 4 10500 -10612 0 08/02/98 4414. 12692' —1WFD 1 /2 "CIBP(CTMD) I 2 -3/4" 4 10650 - 10935 C 08/02/98 2 -3/4" 4 11315 - 11485 C 08/02/98 2 -3/4" 4 11540 - 11680 C 08/02/98 2 -3/4" 4 11715 - 12175 0 08/02/98 2 -3/4" 4 12205 12375 C 08/02/980 2-3/4" 4 12400 - 12695 0 08/02/98 1 PBTD H 1 ! I V TD --1 12805' 1 4 -1/2" LNR, 12.6 #, L -80 IBT -M, .0152 bpf, ID = 3.958" 1-1 12802' 1 DATE REV BY COMMENTS DATE REV BY COMMENTS PRUDHOE BAY UNIT 03/30/75 RIG 51 ORIGINAL COMPLETION WELL: 02 -07A 08/04/98 N22E RWO PERMIT No: 1981070 02/24/11 N7ES RWO API No: 50- 029 - 20154 -01 03/04/11 PJC DRLG DRAFT CORRECTION SEC 36, T11 N, R14E, 1036' FWL & 1570' FNL 03/09/11 BSEIPJC GLV C/O (03/08/11) 03/10/11 WH/PJC FINAL DRLG CORRECTION BP Exploration (Alaska) • • r rt e KA #7,T Page if 12 Common Well Name: 02 -07 AFE No Event Type: WORKOVER (WO) Start Date: 2/15/2011 End Date: 2/23/2011 X4- 00QNX -E (1,996,000.00 ) Project: Prudhoe Bay Site: PB DS 02 Rig Name /No.: NABORS 7ES Spud Date/Time: 7/4/1998 12:00:OOAM Rig Release: 2/23 /2011 Rig Contractor: NABORS ALASKA DRILLING INC. UWI: 500292015400 Active Datum: 17 : 07 2/9/2000 19:08 @58.77ft (above Mean Sea Level) Date From - To Hrs Task Code NPT j NPT Depth Phase Description of Operations (hr) � (ft) 2/15/2011 12:00 - 15:00 3.00 RIGD P PRE WAIT FOR PAD PREP ON DS 02 -07A TO FINISH. - RU BRIDAL LINES. - PREP RIG FOR MOVE. - SHOVEL SNOW AROUND RIG. , WELDER MADE REPAIRS TO GUN SUCTION LINE. 15:00 - 16:00 1.00 RIGD P PRE WAIT FOR PAD PREP ON DS 02 -07A TO FINISH. LOWER DERRICK. 16:00 - 00:00 8.00 - RIGD P PRE WAIT FOR PAD PREP ON DS 02 -07A TO FINISH.; REBUILD TEST PUMP. - REPLACE STEAM VALVE ON GAS BUSTER. - CONTINUE GENERAL MAINTENANCE AND CLEANI NG. AROUND -RIG. 2/16/2011 00:00 - 06:00 6.00 RIGD PRE WAITING FOR PAD PREP ON DS 02 -07A TO FINISH. - CONTINUE WITH GENERAL RIG ----- -- - - - - -- MAINTENANCE AND CLEANING. 06:00 - 12:00 6.00 RIGD PRE WAITING FOR PAD PREP ON DS 02 -07A TO FINISH. - CONTINUE WITH GENERAL RIG AMAINTENANCE AND CLEANING. - UT THE PIPING IN THE PITS. - CREW HELD SHORT CLASS ON ASSET IDENTIFICATION. - WELD CLAMPS ON STAND PIPE. 12:00 - 00:00 12.00 RIGD PRE WAITING FOR PAD PREP ON DS 02 -07A TO FINISH. CONTINUE WITH GENERAL RIG MAINTENANCE AND CLEANING. 1- CREW HELD SHORT CLASS ON ASSET IDENTIFICATION. 2/17/2011 00:00 - 06:00 6.00 RIGD : P PRE 'WAITING FOR PAD PREP TO FINISH ON DS 02 -07A FOR RIG MOVE I - GENERAL RIG MAINTENANCE. 06:00 - 12:00 6.00 RIGD P PRE 'WAITING FOR PAD PREP TO FINISH ON DS 02 -07A FOR RIG MOVE - GENERAL RIG MAINTENANCE. - USE BORESCOPE TO INSPECT BOP INTERNALS. - — - - -- - - -_ _ 12:00 15:00 - -- - ' -- - - - - -- 3.00 MOB P PRE MOVE PITS AND ILLIAMNA CAMP TO DS 02. - INSTALLED THE JEEP ON THE PITS. - MOVE ILLIAMNA CAMP, PITS, AND SHOP TO DS 02. 15:00 - 18:30 3.50 MOB P PRE r MOVE SUB FROM DS 05 TO DS 02. - RIG ON LOCATION AT 18:30 HRS. 18:30 - 22:30 4.00 RIGU P PRE SPOT SUB ON DS 02 -07A - LAY RIG MATS AND HERCULITE. - SPOT RIG OVER WELL. I i 22:30 - 23:00 0.50 RIGU P PRE !RAISE THE DERRICK. - PJSM WITH RIG CREW. - RAISE DERRICK. - WINDS INCREASING TO 20 MPH. 23:00 - 00:00 1.00 RIGU 1 P PRE RIG UP FLOOR EQUIPMENT. Printed 3/4/2011 10:43:OOAM . Common Well Name: 02 -07 AFE No Event Type: WORKOVER (WO) I Start Date: 2/15/2011 End Date: 2/23/2011 IX4- 00QNX -E (1,996,000.00 ) Project: Prudhoe Bay Site: PB DS 02 Rig Name /No.: NABORS 7ES Spud Date/Time: 7/4/1998 12:00:OOAM Rig Release: 2/23/2011 Rig Contractor: NABORS ALASKA DRILLING INC. UWI: 500292015400 Active Datum: 17 : 07 2/9/2000 19:08 @58.77ft (above Mean Sea Level) Date I From - To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (ft) 2/18/2011 00:00 - 01:30 1.50 RIGU P PRE RIG UP TO ACCEPT RIG. I i - CONTINUE TO RIG UP FLOOR EQUIPMENT. - SPOT PITS AND RIG UP LINES. - SPOT TIGER TANK. 01:30 - 05:00 3.50 RIGU P PRE RIG UP TO ACCEPT RIG. BRIDLE DOWN. RIG -UP HARDLINE TO TIGER TANK. '- WAIT FOR BLEED TANK. - BLEED TANK ON LOCATION WAS NOT AVAILABLE - WAITING ON TO PULL BPV. - HAVING ISSUES TESTING ON ANOTHER RIG. * *RIG ACCEPTED' °AT:05 :00 HRS ** 05:00 -- 07:00 2.00 RIGU P PRE TAKE ON SEAWATERTO PITS. - TAKE ON 8:5 PPG;120 DEG F SEAWATER TO PITS. - RIG UP DOUBLE ANNULS VALVE FOR CIRCULATING. - RIG UP CIRCULATING MANIFOLD ON IA. 07:00 - 08:00 1.00 RIGU N WAIT PRE " WAITING FOR DSM BACK PRESSURE CREW. f 08:00 - 09:00 1.00 RIGU P PRE I PRE -SPUD MEETING AND RIG ABANDONMENT DRILL. - HELD A PRE -SPUD MEETING WITH THE RIG CREW, SUPPORT PERSONNEL, MUD ENGINEER AND WSL. - HELD A RIG ABANDONMENT DRILL WITH _ DRILL CREW. 09:00 - 13:30 4.50 RIGU P PRE RU DSM LUBRICATOR AND TEST TO 250 / 3500 PSI FOR 5 CHARTED MINUTES. - PJSM WITH DSM AND RIG CREW. - RIG UP LUBRICATOR TO TOP OF TREE. - ATTEMPTED TO TEST THE LUBRICATOR AGAINST THE SWAB VALVE - TEST FAILED. - ATTEMPTED TO TEST AGAINST THE MASTER VALVE. - TEST FAILED. - CALLED OUT GREASE CREW - GREASED AND FUNCTIONED TREE VALVES. - TEST ALL SURFACE EQUIPMENT TO VERIFY THERE AREN'T ANY LEAKS. - PRESSURE TEST LUBRICATOR TO 250 PSI LOW / 3500 PSI HIGH. - GOOD TEST. 113:30 14:30 1.00 r P DECOMP PULL BPV AND LAY DOWN. - PULL BPV WITH DSM CREW AND LAY DOWN. - RIG UP CIRCULATING LINES. Printed 3/4/2011 10:43:OOAM I • 5 tElAttt`�1 1)1't1SCY.. H Common Well Name: 02 -07 AFE No Event Type: WORKOVER (WO) Start Date: 2/15/2011 End Date: 2/23/2011 X4- 000NX -E (1,996,000.00 ) Project: Prudhoe Bay i Site: PB DS 02 j Rig Name /No.: NABORS 7ES Spud Date/Time: 7/4/1998 12:00:OOAM Rig Release: 2/23/2011 Rig Contractor: NABORS ALASKA DRILLING INC. UWI: 500292015400 Active Datum: 17 : 07 2/9/2000 19:08 @58.77ft (above Mean Sea Level) Date From - To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (ft) 14:30 - 20:30 6.00 KILLW P DECOMP CIRCULATE OUT FREEZE PROTECT AND DISPLACE TO KILL WEIGHT FLUID. - PRESSURE TEST ALL SURFACE LINES 250/2500 PSI. - GOOD TEST. - REVERSE CIRCULATE 40 BBLS OF DIESEL FREEZE PROTECT. - 120 DEG F, 8.5 PPG SEAWATER. - PUMP AT 3 BPM AND 340 PSI. CIRCULATE 162 BBLS THE LONG WAY. -120 DEG 8.5 PPG SEAWATER. - PUMP AT 3 BPM AND 260 PSI. - RECOVERED 150 BBL OF DIESEL FROM BOTH THE TUBING AND THE IA. - PUMP 50 BBL BARACLEAN SOAP PILL SURFACE TO SURFACE. - PUMPED AT 7 RPM AND 810 PSI. SHUTDOWN AND MONITOR WELL FOR 10 MIN. - WELLIS STATIC. 20:30 22:00 1.50 WHSUR P ! - DECOMP SET BPV. -RIG UP DSM LUBRICATOR AND TEST TO 250/3500 PSI FOR 5 CHARTED MIN. - GOOD TEST. SET ISA BPV. - TEST FROM BELOW TO 1000 PSI FOR 10 ■ CHARTED MIN. - GOOD TEST. - RIG DOWN AND BLOW DOWN ALL LINES. 22:00 - 23:00 1.00 WHSUR P 1 DECOMP NIPPLE DOWN THE TREE. - PJSM WITH RIG CREW AND FMC REPRESENTATIVE. - NIPPLE DOWN TREE AND ADAPTER I FLANGE. 23:00 - 00:00 1.00 WHSUR P DECOMP NIPPLE UP 135/8 ". 5M. FOUR PREVENTER BOP STACK. - PJSM WITH THE RIG CREW. - INSTALL ISA BLANKING PLUG. - HANGER THREADS LOOKED GOOD. - NIPPLE UP 13 5/8 ", 5M, FOUR PREVENTER BOP STACK AS FOLLOWS FROM TOP TO BOTTOM: -13 5/8" ANNULAR PREVENTER. - 3" X 6" VBR. - BLIND SHEAR RAMS. - MUD CROSS - 2 7/8" X 5" VBR. - TEST SPOOL. 2/19/2011 00:00 - 01:00 1.00 WHSUR P DECOMP CONTINUE TO NIPPLE UP BOP STACK: - NIPPLE UP 13 5/8 ", 5M, FOUR PREVENTER BOP STACK AS FOLLOWS FROM TOP TO BOTTOM: - 135/8" ANNULAR PREVENTER. -3 "X6 "VBR. - BLIND SHEAR RAMS. - MUD CROSS - 27/8 "X5 "VBR. - TEST SPOOL. Printed 3/4/2011 10:43:OOAM x ` Operation Summa R epo Common Well Name: 02 -07 AFE No Event Type: WORKOVER (WO) I Start Date: 2/15/2011 End Date: 2/23/2011 X4- 000NX -E (1,996,000.00 ) Project: Prudhoe Bay Site: PB DS 02 Rig Name /No.: NABORS 7ES Spud Date/Time: 7/4/1998 12:00:OOAM Rig Release: 2/23/2011 Rig Contractor: NABORS ALASKA DRILLING INC. UWI: 500292015400 Active Datum: 17 : 07 2/9/2000 19:08 @58.77ft (above Mean Sea Level) Date From - To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) 00 01:00 - 02:00 1.00 r WHSUR P DECOMP RIG UP TO TEST BOPE. - TEST WITNESS WAIVED BY JOHN CRISP ON 102/18/2011 AT 17:00. - PICK UP TEST TOOLS. CHARGE ACCUMULATOR. 1- LOWER RAM DOOR HINGE SEAL LEAKING. CALLED OUT RIG MECHANIC. RIG UP TO TEST CHOKE MANIFOLD BY ITSELF. 02:00 - 03:00 1.00 WHSUR P DECOMP ITESTCHOKE MANIFOLD AS PER AOGCC AND BP ADWOP. BEGIN TESTING CHOKE MANIFOLD VALVES. TEST ALL VALVES TO 250 PSI LOW 3500 PSI HIGH FOR 5 CHARTED MIN. - - TEST WEREAGAINSsTTHE BACKSIDE OF VALVE 14.x' SLOW LEAK PAST VALVE 14, TO CHOKE LINE. BLED OFF PRESSURE AND GREASED VALVE. 03:00 - 03:30 0.50 WHSUR P DECOMP i RIG UP TO TEST BOP STACK. - PICK UP REMAINING TOOLS TO TEST BOP STACK. - LOWER RAM DOOR HINGE SEAL REPAIRED. 4 FOR 5 CHARTED MINUTES EACH PER AOGCC 03:30 08:30 5.00 WHSUR P DECOMP TEST BOPE TO 250 PSI LOW, 3500 PSI HIGH - AND BP ADWOP. - JOHN CRISP WAIVED TEST WITNESS ON 02/18/2011 AT 17:00. TESTED ALL CHOKE MANIFOLD VALVES. - TESTED DART VALVE, TIW VALVE, (BOPS. I- KILL AND CHOKE LINE MANUAL AND HCR 6OP !VALVES. - BLIND /SHEAR RAMS. - UPPER AND LOWER VARIABLE BORE RAMS. - TESTED WITH BOTH 4" AND 4 1/2" TEST JOINT. - ANNULAR PREVENTER. - TESTED WITH BOTH 4" AND 4 1/2" TEST JOINT. - ACCUMULATOR DRAW -DOWN TEST. - 200 PSI IN 14 SEC. - FULL PRESSURE IN 94 SEC. _ 08:30 - 09:30 1.00 WHSUR P DECOMP RIG DOWN BOP TEST EQUIPMENT. 09:30 - 11:30 2.00 WHSUR , P DECOMP PULL ISA BLANKING PLUG AND BPV AND LAY DOWN. - RIG UP DUTCH RISER AND DSM LUBRICATOR. - TEST LUBRICATOR TO 250 PSI LOW / 3500 PSI HIGH. - PULL BPV. - REVERSE CIRC. TO ENSURE THAT BPV IS PULLED. - LAY DOWN DSM LUBRICATOR AND BPV. - RIG DOWN DUTCH RISER. Printed 3/4/2011 10:43:OOAM Ope Summary Report Common Well Name: 02 -07 AFE No Event Type: WORKOVER (WO) Start Date: 2/15/2011 End Date: 2/23/2011 X400QNX -E (1,996,000.00 ) Project: Prudhoe Bay Site: PB DS 02 Rig Name /No.: NABORS 7ES Spud Date/Time: 7/4/1998 12:00:OOAM Rig Release: 2/23/2011 Rig Contractor: NABORS ALASKA DRILLING INC. UWI: 500292015400 Active Datum: 17 : 07 2/9/2000 19:08 ©58.77ft (above Mean Sea Level) Date From - To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (ft) 11 :30 - 13:00 1.50 PULL P DECOMP PULL TUBING HANGER. - MAKE UP XO TO LANDING JOINT. - RUN IN AND SCREW INTO TUBING HANGER. - BACK OUT LOCK DOWN SCREWS. - PULL TUBING HANGER TO FLOOR. - HANGER PULLED FREE AT 140K LBS. - MONITOR WELL FOR 15 MINUTES. - WELL IS STATIC. 113:00 - 14:30 1.50 PULL P DECOMP CIRCULATE A BARACLEAN SOAP PILL., I- PUMP BARACLEAN PILL FOLLOWED BY 8.5 PPG SEAWATER. PUMP. 574 BBLS AT 10 BPM AND 630 PSI. - MONITOR WELL FOR 10 MIN. - WELL IS STATIC. - RIG UP TUBING HANDLING EQUIPMENT WHILE CIRCULATING 14:30 - 00:00 9.50 PULL P DECOMP_ P111 I OUT. OF NOLE`AND LAY DOWN 4 1/2" - LAY DOWN TUBING HANGER. PULL AND LAY DOWN 4 1/2" TUBING STRING. - FROM CUT JOINT AT 9480' TO 1029'. - MODERATE TO INTERNAL CORROSION NOTED. MODERATE TO SEVERE CORROSION ON TUBING PIN END THREADS. OA =OPSI. CONTINUE MONITORING OA ON AN HOURLY BASIS IN PREPARATION FOR TUBING SPOOL CHANGE OUT. 2/20/2011 , 00:00 - 01:30 1.50 PULL ' P DECOMP PULL OUT OF HOLE AND LAY DOWN 4 1/2" I TUBING. - CONTINUE TO PULL AND LAY DOWN 4 1/2" ,TUBING STRING. - FROM 1029' TO CUT JOINT. - RECOVERED FROM WELL: - (228) JOINTS OF 4 112" TUBING. - (1) X- NIPPLE. - (3) GLMS. - (8) 4 1V2" TUBING PUPS. - (1) CUT JOINT OF 4 1/2" TUBING. - 11.49' LONG, FLARE OD = 4 7/8" OA =OPSI. CONTINUE MONITORING OA ON AN HOURLY BASIS IN PREPARATION FOR TUBING SPOOL CHANGE OUT. 01:30 02:00 0.50 PULL P DECOMP RIG DOWN TUBING HANDLING EQUIPMENT AND CLEAN RIG FLOOR. Printed 3/4/2011 10:43:OOAM P� Bc1, f ' Operation Summary =Repor t Common Well Name: 02 -07 AFE No Event Type: WORKOVER (WO) Start Date: 2/15/2011 End Date: 2/23/2011 X400QNX -E (1,996,000.00 ) Project: Prudhoe Bay Site: PB DS 02 Rig Name /No.: NABORS 7ES Spud Date/Time: 7/4/1998 12:00:OOAM Rig Release: 2/23/2011 Rig Contractor: NABORS ALASKA DRILLING INC. UWI: 500292015400 Active Datum: 17 : 07 2/9/2000 19:08 @58.77ft (above Mean Sea Level) Date From - To Hrs Task Code NPT NPT Depth Phase ' Description of Operations (hr) (ft) 02:00 - 05:30 3.50 FISH P DECOMP PICK UP AND MAKE UP BHA #1, DRESS -OFF 1 ASS'Y. - PJSM WITH RIG CREW AND BAKER FISHING REPRESENTATIVE. MAKE UP BHA #1 AS FOLLOWS: - 6" X 4 9/16" DRESS -OFF MILL - (3) WASHPIPE EXTENSIONS INNER DRESS -OFF MILL - WASHOVER BOOT BASKET - DOUBLE PIN SUB - 7" CASING SCRAPER - BIT SUB - STRING MAGNET - BUMPER SUBS OIL JAR' , +, 1 - PUMP -OUT SUB - (6) 4 3/4' DRILL COLLARS - XO BACK TO DRILL PIPE - TOTAL BHA LENGTH = 241.56' -MAX BHA OD =6" 1 -MIN BHA ID = 1" -- - - TOTAL WASHOVER LENGTH = 16.48' 05:30 13:00 7.50 i FISH P DECOMP "tRUN IN THE HOLE WITH BHA #1, DRESS -OFF ASS'Y, ON4" DRILL PIPE. - PICKING UP DRILL PIPE FROM PIPE SHED. - FROM 241' TO 9263'. - UP WEIGHT = 155K LBS, DOWN WEIGHT = 140K LBS. -- - - - - -- 1- 13:00 - 14:00 ! 1.00 1 WHSUR P 1 DECOMP ;SET AND TEST 95/8" HES RTTS STORM ' PACKER - PICK UP AND RUN IN THE HOLE WITH THE 9 5/8" RTTS STOIRM PACKER. - SET PACKERIDNE STAND BELOW ROTARY'. - TEST FROM ABOVE TO 1000 PSI OR 10 CHARTED MINUTES. - GOOD TEST. 14:00 - 15:30 1.50 WHSUR P DECOMP 1NIPPLPE DOWN THE BOP STACK. !- PJSM WITH RIG CREW. - NIPPLE DOWN AND SET BACK BOP STACK. 15:30 - 17:00 1.50 WHSUR 1 P DECOMP NIPPLE DOWN TUBING SPOOL. - PJSM WITH RIG CREW AND FMC REPRESENTATIVE. I- NIPPLE DOWN TUBING SPOOL. 17:00 - 20:30 3.50 WHSUR P DECOMP SET NEW 9 5/8" PACK -OFF ANI) NIPPLE_UP NEW TUBING SPOOL - NIPPLE UP NEW TUBING SPOOL. - TEST HANGER SEAL AND VOID. - TEST TO 5000 PSI FOR 30 CHARTED MINUTES. - GOOD TEST. 20:30 - 22:30 2.00 WHSUR P DECOMP • •1 F LIP RfP STACK PJSM WITH RIG CREW. I- NIPPLE UP BOP STACK. 122:30 - 23:30 1.00 WHSUR P DECOMP TEST BOP BREAKS. - TEST BOP BREAKS TO 250 PSI LOW, 3500 PSI HIGH. - GOOD TEST. - SET 8.75" ID WEAR RING 1 23:30 - 00:00 0.50 WHSUR P DECOMP SERVICE TOP DRIVE AND BLOCKS. - I Printed 3/4/2011 10:43:OOAM P, , 1 2 -,f;- .- - --- - -;--. 5 .iiiftiArtje.iita.. Aus 'BP .-'-',, .,, - .- -:;-;:, - - -- .2-':.:* , , - -,,. -,-..'. jE Operation Su Repot Common Well Name: 02 -07 I AFE No Event Type: WORKOVER (WO) Start Date: 2/15/2011 End Date: 2/23/2011 X4- 00QNX -E (1,996,000.00 ) Project: Prudhoe Bay Site: PB DS 02 Rig Name /No.: NABORS 7ES Spud Date/Time: 7/4/1998 12:00:OOAM 1 Rig Release: 2/23/2011 Rig Contractor: NABORS ALASKA DRILLING INC. UWI: 500292015400 Active Datum: 17 : 07 2/9/2000 19:08 @58.77ft (above Mean Sea Level) Date From - To Hrs Task 1 Code NPT NPT Depth Phase Description of Operations (hr) (ft) 2/21/2011 00:00 - 01:00 1.00 WHSUR P DECOMP RELEASE AND RETRIEVE HALIBURTON RTTS i STORM PACKER. I - RELEASE, RETRIEVE AND LD HES RTTS. 01:00 - 01:30 0.50 FISH P DECOMP RUN IN HOLE AND TAG TUBING STUB WITH BHA #1, DRESS -OFF ASS'Y. . - RUN IN HOLE, PICKING UP DP FROM SHED. 1 -°FROM 9261' TO TOP OF TUBING STUB AT 9475' DPM. - WORK SCRAPER OVER PACKER SETTING ' , DEPTH AT 9354'. 01:30 - 02:30 1.00 FISH P DECOMP ;DRESS-OFF TUBING STUB AT 9475' DPM. `- TAG TUBING STUB AT 9475' DPM. 1. - PICK UP AND ESTABLISH MILLING PARAMETERS. - UP WEIGHT =, 157K LBS, DOWN WEIGHT 1= 143K LBS. , . - -5 BPM AT 600-PSl. - 60 RPM AND 2.5K FT -LBS TORQUE. ..- ROTATING WEIGHT = 150K LBS. DRESS OFF TUBING STUB PER BAKER FISHING REP. " " - TO 9492' DPM. MILLED OFF 6 ". - WORKED DRESS -OFF ASS'Y OVER TUBING STUB SEVERAL TIMES WITHOUT ROTATION _,_ OR PUMPS. 02:30 - 03:30 1.00 1 FISH P DECOMP 1 CIRCULATE HIGH -VIS SWEEP. - PICK UP OFF OF TUBING STUB TWO JOINTS. - CIRCULATE A 35 BBL HIGH -VIS SWEEP - 11 BPM AND 2450 PSI. 03:30 - 07:00 3.50 FISH P DECOMP PULL OUT OF HOLE WITH BHA #1. DRESS -OFF ASS'Y. - FROM 9475' TO 241' DPM. - MONITOR WELL FOR 5 MIN. - WELL WAS STATIC. 07:00 - 08:30 1.50 FISH P DECOMP LAY DOWN BHA #1, DRESS -OFF ASS'Y. - STAND BACK 2 STANDS OF DRILL COLLARS FOR NEXT BHA. - LAY DOWN BHA #1. - SIGNS OF MILLING PRESENT ON INNER MILL. I 08:30 - 10:30 2.00 FISH P DECOMP PICK UP BHA #2, JUNK CATCHER RETRIEVAL 1BHA. - PJSM WITH RIG CREW AND BAKER FISHING i REPRESENTATIVE. - RIG UP 2 7/8" HANDLING EQUIPMENT. - PU BHA #2 AS FOLLOWS - ITCO SPEAR W/ 2.933 GRAPPLE. - SPEAR EXTESION. - STOP SUB. - 'XO' TO 2 7/8 PAC. - (3) 2 7/8" PAC DRILL PIPE. II i - 'XO' TO 3 1/2" IF. - BUMPER SUB. - OIL JAR. - PUMP -OUT SUB. - (6) 4 3/4" DRILL COLLARS. - 'XO' BACK TO DRILL PIPE. - TOTAL LENGHT = 306.98' - MAXOD =5" -MIN ID =0.5" Printed 3/4/2011 10:43:OOAM 4r tAdcASK1BP � °+ � [yp y t I'q�Fd Q' Wr 1 Operation blintinalry Report Common Well Name: 02 -07 AFE No Event Type: WORKOVER (WO) Start Date: 2/15/2011 End Date: 2/23/2011 X4- 00QNX -E (1,996,000.00 ) � I Project: Prudhoe Bay Site: PB DS 02 Rig Name /No.: NABORS 7ES Spud Date/Time: 7/4/1998 12:00:OOAM Rig Release: 2/23/2011 Rig Contractor: NABORS ALASKA DRILLING INC. UWI: 500292015400 Active Datum: 17 : 07 2/9/2000 19:08 @58.77ft (above Mean Sea Level) Date From - To Hrs Task Code NPT NPT Depth Phase I Description of Operations (hr) (ft) 1 10:30 - 14:00 3.50 FISH P DECOMP RUN IN HOLE WITH BHA #2, JUNK CATCHER RETRIEVAL BHA. - FROM 307 TO 9420' DPM. UP WEIGHT = 158K LBS, DOWN WEIGHT = 142K LBS. - ESTABLISH PARAMETERS: 2.5BPMAND215PSI. - 3.5 BPM AND 480 PSI. 4:00 - 15:00 1.00 FISH P DECOMP WASH DOWN AND PULL JUNK CATCHER FROM TUBING STUB. - WASH DOWNAT 2.5 BPM AND 218 PSI. TAG TUBING TUB AT 9475' DPM. - TAG JUNK CATCHER AT 9536' DPM. I- PULL JUNK CATCHER FROM TUBING SUB. - PICK UP 10K LBS,;; THEN SLACK OFF 10K LBS. - PICK UP 10K LBS OVERPULL AND PULL JUNK CATCHER: FREE. - PICK UP TO 9421' DPM. 15:00 17:00 2.00 FISH ' p 1 DECOMP OPEN PUMP -OUT SUB AND DISPLACE WELL TO CLEAN SEAWATER. - DROP PUMP -OUT SUB DART AND OPEN PUMP -OUT SUB. - PUMP DOWN AT 2 BPM. - OPEN PUMP -OUT SUB WITH 2000 PSI. - DISPLACE WELL TO CLEAN 8.5 PPG SEAWATER. - PUMPED 590 BBLS AT 8 BPM AND 1000 PSI. j ? - MONITOR WELL FOR 5 MIN. - WELL WAS STATIC. 17:00 - 23:00 6.00 FISH P DECOMP PULL OUT OF THE HOLE, LAYING DOWN DRILL PIPE. - FROM 9420' TO 307' DPM. 23:00 - 00:00 1.00 FISH P DECOMP LAY DOWN BHA #2, JUNK CATCHER RETRIEVAL BHA, WITH JUNK CATCHER. - LAY DOWN JUNK CATCHER AND SPEAR. - NO NOTICEABLE TRASH IN JUNK 1 CATCHER. 2/22/2011 00:00 - 01:00 r 1.00 FISH P DECOMP ' LAY DOWN DRILL PIPE IN DERRICK. 1 - LAY DOWN LAST TWO STANDS OF 4" DRILL `PIPE IN DERRICK. - PULL WEAR BUSHING. RIG DOWN 2 7/8" HANDLING EQUIPMENT. 01:00 - 02:00 1.00 RUNCOM P RUNCMP MAKE A DUMMY RUN WITH THE 4 1/2" 1TUBING HANGER. I - PJSM WITH RIG CREW. - MAKE DUMMY RUN WITH TUBING HANGER AND MARK TEST JOINT. 02:00 - 04:00 2.00 RUNCOM RUNCMP , RIG UP TO RUN THE 4 1/2 ". 12.6 LB/FT, . 13CR -85 COMPLETION. - RIG UP SINGLE JOINT COMPENSATOR AND TORQUE TURN EQUIPMENT. 1 1 - RIG UP DOUBLE STACK POWER TONGS. Printed 3/4/2011 10:43:OOAM Amer a t ; A rn FCC 1 O pera t ion S , Common Well Name: 02 -07 AFE No Event Type: WORKOVER (WO) Start Date: 2/15/2011 End Date: 2/23/2011 X4- 00QNX -E (1,996,000.00 ) Project: Prudhoe Bay , Site: PB DS 02 Rig Name /No.: NABORS 7ES 1 Spud Date/Time: 7/4/1998 12:00:OOAM Rig Release: 2/23 /2011 Rig Contractor: NABORS ALASKA DRILLING INC. UWI: 500292015400 Active Datum: 17 : 07 2/9/2000 19:08 @58.77ft (above Mean Sea Level) Date From - To 1 Hrs Task Code NPT 1 NPT Depth Phase Description of Operations (hr) 1 (ft) 04:00 - 12:00 1 8.00 RUNCOM P I RUNCMP RUN IN THE HOLE WITH THE 4 1/2 ", 12.6 LB/FT, 13CR -85 COMPLETION PER THE 1 I 1 RUNNING TALLY. 1 - PJSM WITH RIG CREW AND NABORS CASING HAND. - PICK UP AND MAKE UP COMPLETION ,JEWELRY. - BAKER LOC ALL CONNECTIONS BELOW THE PACKER. - OPTIMUM MAKE UP TORQUE = 4400 FT -LBS. t- USE JET-LUBE SEAL GUARD ON ALL I ; ' THREADS. - UP WEIGHT = 105K LBS, DOWN WEIGHT = 1 100K LBS. 12:00 - 14:00 2.00 RUNCOM P RUNCMP CONTINUE TO RUN IN THE HOLE WITH THE 4 j 1/2 ", 12.6LB,13CR -85, VAM TOP COMPLETION. 1 - OPTIMUM MAKE UP TORQUE = 4440 FT -LBS. 1 UP WEIGHT = 130K LBS, DOWN WEIGHT = 1 115K LBS. -, FROM 7308' TO 9485'. 1 14:00 - 15:30 1.50 RUNCOM P j RUNCMP SPACE OUT AND LAND 4 1/2 ", 12.6LB, 13CR -85, VAMTOP COMPLETION. OBSERVED FIRST SHEAR ON OVERSHOT AT 3.4' IN r - PINS SHEARED WITH 11K LBS. L 1- OBSERVED SECOND SHEAR ON OVERSHOT AT 11.4' IN - PINS SHEARED WITH 11K LBS. - TAGGED NO-GO ON OVERSHOT AT 13.7' IN. I �� - SET DOWN 10K LBS TO VERIFY. j - PICKED UP AND SPACED OUT I ! COMPLETION. ' - ADDED SPACE OUT JNT (FULL JOINT) - BOTTOM OF OVERSHOT AT 9484' - PICKED UP TUBING HANGER AND MADE i UP TO LANDING JOINT. - LANDED COMPLETION AND RAN IN LOCK � DOWN SCREWS ON TUBING HANGER. - UP WEIGHT = 130K LBS, DOWN WEIGHT = 115K LBS. 15:30 - 19:00 1 3.50 RUNCOM . P RUNCMP ISPOT CORROSION INHIBITED SEAWATER AND DROP BALL AND ROD. - REVERSE CIRCULATE 150 BBLS OF CLEAN SEAWATER. - 4 BPM AND 800 PSI. - REVERSE CIRCULATE 430 BBLS OF CORROSION INHIBITED SEAWATER. - 4 BPM AND 800 PSI. - PUMP 5 BBLS OF CLEAN SEAWATER TO ■ FLUSH DEBRIS OFF OF BALL SEAT ON RHC -M PLUG. - INSTALLED LANDING JOINT. -_ I L _ - DROPPED BALL AND ROD. - - -- - - - - -- Printed 3/4/2011 10:43:OOAM l I �1 A i KA Bk " , Pa tE3 0 f 12 s, Ope ration Summ ;Repast Common Well Name: 02 -07 AFE No Event Type: WORKOVER (WO) j Start Date: 2/15/2011 End Date: 2/23/2011 X4- 000NX -E (1,996,000.00 ) Project: Prudhoe Bay Site: PB DS 02 Rig Name /No.: NABORS 7ES Spud Date/Time: 7/4/1998 12:00:OOAM Rig Release: 2/23/2011 Rig Contractor: NABORS ALASKA DRILLING INC. UWI: 500292015400 Active Datum: 17 : 07 2/9/2000 19:08 @58.77ft (above Mean Sea Level) Date From - To Hrs Task Code ' NPT NPT Depth Phase 1 Description of Operations _ (hr) (ft) 19:00 - 22:00 3.00 I RUNCOM P , I RUNCMP SET HALLIBURTON 'TNT' PACKER AND PRESSURE TEST TUBING AND PACKER. I- PRESSURE UP ON TUBING TO SET I I 1 1 HALLIBURTON 'TNT' PACKER. - PACKER SET TO SHEAR AT 1900 PSI. - POSITIVE INDICATION OF PACKER 1 SETTING @ 2100 PSI 1 - PRESSURE TEST TUBING TO 3500 PSI FOR 30 CHARTED MINUTES. - PRESSURE UP TO 3500 PSI FOR 30 MIN. - 80 PSI BLEED IN THE FIRST 15 MIN. 38 PSI BLEED IN THE SECOND 15 MIN. I- BLED OFF TUBING SIDE TO 1500 PSI. - PRESSURE TEST ANNULUS TO 3500 PSI. TBG STARTED - TRACKING IA. I - FOUND LEAKING,VALVE ON HP MANIFOLD I NOT ISOLATING THE ACTUAL TBG PRESS. I TBG STILL HAD 1500 PSI. ' - PRESSURE TEST ANNULUS TO 3500 PSI _ - 1 FOR 30 CHARTED MINUTES. - 50 PSI BLEED IN THE FIRST 15 MIN. 10 PSI BLEED IN THE SECOND 15 .MIN. } - BLED OFF ANNULUS TO 1500 PSI. i- BLED OFF TUBING AND ANNULUS I TOGETHER TO 0 PSI. - CALLED RWO SUPERINTENDENT WITH I TEST RESULTS. - AUTHORIZED TO PROCEED. 1 - PRESSURE UP ON ANNULUS TO SHEAR I ;DCK VALVE. - DCK SHEARED AT 2400 PSI. - PUMPED 5 BBLS EACH WAY TO ENSURE CIRCULATION FOR FREEZE PROTECT. I - IA = 400 PSI, TBG = 410 PSI. 22:00 - 23:30 1.50 BOPSUR P i RUNCMP : INSTALL AND TEST TWC. FMC REPRESENTATIVE USED DRY ROD TO INSTALL TWC. - TEST TWC FROM ABOVE. - PRESSURE UP TO 250 PSI FOR 5 MIN. CHARTED. GOOD TEST. - PRESSURE UP TO 3500 PSI FOR 10 MIN. CHARTED. GOOD TEST - TEST TWC FROM BELOW. I - PRESSURE UP TO 1000 PSI FOR 10 MIN. GOOD TEST. 23:30 - 00:00 0.50 BOPSUR P RUNCMP RIG DOWN AND PREPARE TO NIPPLE DOWN BOPE - BLOW DOWN ALL LINES TO BOP STACK I AND PITS. I I - PUMP OUT BOP STACK. - RIG DOWN HYDRAULIC LINES TO BOP STACK. 2/23/2011 00:00 00:30 0.50 BOPSUR P RUNCMP CONT. TO RIG DOWN AND PREPARE TO NIPPLE DOWN BOPE - BLOW DOWN ALL LINES TO BOP STACK AND PITS. - PUMP OUT BOP STACK. I - RIG DOWN HYDRAULIC LINES TO BOP STACK. Printed 3/4/2011 10:43:OOAM t 1 Aa;E� � v ✓ v n �; r � � z s, `�� ration Summary Raplo Common Well Name: 02 -07 AFE No Event Type: WORKOVER (WO) Start Date: 2/15/2011 End Date: 2/23/2011 'X4- 000NX -E (1,996,000.00 ) -- Project: Prudhoe Bay I Site: PB DS 02 Rig Name /No.: NABORS 7ES Spud Date/Time: 7/4/1998 12:00:OOAM Rig Release: 2/23/2011 Rig Contractor: NABORS ALASKA DRILLING INC. 1 UWI: 500292015400 Active Datum: 17 : 07 2/9/2000 19:08 @58.77ft (above Mean Sea Level) Date From - To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (ft) 00:30 - 01:30 1.00 BOPSUR P RUNCMP ' NIPPLE DOWN BOP STACK. - NIPPLE DOWN BOP STACK. - SET STACK BACK ON STUMP IN CELLAR 01:30 - 03:00 1.50 WHSUR P I WHDTRE NIPPLE UP ADAPTER FLANGE AND TREE 03:00 - 05:00 2.00 WHSUR P WHDTRE (PRESSURE TEST ADAPTER VOID TO 5000 PSI FOR 30 CHARTED MINUTES. - HAD ISSUES WITH PRESS INCREASE & DROP DUE TO SMALL CHANGES IN TEMP DUETOWIND. ` T.- CARRIED TEST OUT FOR AN ADDITIONAL 30 MIN AFTER WRAPPING ELECTRONIC GAUGE - WITH ABSORBENT -GOOD TEST I PRESSURE TESTTREETO 5000 PSI FOR 35 i CHARTED MINUTES.- �- FILLEDTREE AND TEST LINES WITH DIESEL. - CYCLED TREE VALVES. PRESSURE UP TO 250 PSI FOR 5 MIN. GOOD _ TEST - PRESSURED UP TO 5000 PSI FOR 30 MIN. - PRESSURE STABILIZED AFTER 5 MIN. - 60 PSI FIRST 15 MIN & 5 PSI SECOND 15 MIN ✓ - GOOD TEST 05:00 - 06:30 1.50 WHSUR P WHDTRE RU LUBRICATOR & TEST - PRESSURE UP TO 250 PSI CHARTED FOR 5 MIN. GOOD TEST. - PRESSURE UP TO 3500 PSI CHARTED FOR 5 MIN. GOOD TEST. PULL TWC I ' RD LUBRICATOR 06:30 - 10:00 3.50 WHSUR P WHDTRE PUMP FREEZE PROTECT - PJSM WITH RIG CREW AND LITTLE RED HOT OIL SERVICE REPRESENTATIVES. - RIG UP LITTLE RED HOT OIL TO PUMP DIESEL FREEZE PROTECT. - PRESSURE TESTED SURFACE TO 3500 PSI. - REVERSE IN 157 BBLS OF 80 DEG F DIESEL. - 2 BPM @ 300 PSI - LINE UP AND U -TUBE DIESEL BETWEEN TUBING AND ANNULUS. II I Printed 3/4/2011 10:43:OOAM J • .4; cr an on Sum ait Report Common Well Name: 02 -07 AFE No Event Type: WORKOVER (WO) Start Date: 2/15/2011 I End Date: 2/23/2011 X4- 00QNX -E (1,996,000.00 ) Project: Prudhoe Bay Site: PB DS 02 Rig Name /No.: NABORS 7ES Spud Date/Time: 7/4/1998 12:00:OOAM Rig Release: 2/23/2011 Rig Contractor: NABORS ALASKA DRILLING INC. UWI: 500292015400 Active Datum: 17 : 07 2/9/2000 19:08 @58.77ft (above Mean Sea Level) Date From - To Hrs Task Code 1 NPT NPT Depth Phase Description of Operations _ (hr) (ft) 10:00 - 12:00 2.00 WI-ISUR P WHDTRE INSTALL BPV. -RIG UP DSM LUBRICATOR AND TEST. - PRESSURE UP TO 250 PSI. LOW, CHARTED. GOOD TEST. -PRESSURE UP TO 3500 PSI. HIGH, CHARTED. GOOD TEST. - INSTALLED THE BPV. TEST BPV FROM BELOW WITH LITTLE RED. - PRESSURE UP TO 250 PSI LOW, CHARTED. GOOD TEST - PRESSURE UP TO 1000 PSI HIGH FOR 10 MIN. CHARTED. GOOD TEST -SECURED THE WELL. RELEASES) THE RIG FROM DS 02 -07A @ 12:00 HRS NOON FOR MOVE TO DS 05 -07. Printed 3/4/2011 10:43:OOAM ~~ . _ ~,~ PrtoMive Diaynosric S~rnncES, Inc. V 1f 6~~L. Lf./i7 T`R~4fII~,~f7~"~4L To: A~CC Christine Mahnken 333 W. 7th Ave Suite 100 Anchorage, Alaska 99501 (907] 793-1225 RE : Cased Hole/Open Hole/Mechanical Logs and/orTubing Inspection(Caliper/ MTT) The technical data listed below is being submitted herewith. Please acknowledge receipt by returning a signed copy of this transmittal letter to the following : BP Exploratian (Aiaskaj, inc. Pe~rotechnical Data Center Attn: Joe Lastufka LR2-1 900 Benson Bhrd. Anchorage, Alaska 99508 and ProActive Diagnostic Seruices, Inc. Attn: Robeit A. Richey 130 West tnternational Airport Raad Suite C Anchorage, AK 99518 Fa~c (907) 245-6952 1) Leak Detection - WLO 2J Leak Det ~ on - WLD _ ~ ~ ; Signed : '',~~' Print Name: Q5,Sep-09 i t°~~s- ~a~~- ~~~ -i ~C~ 1~~a~~ ~ ~ ~~~~ ~ ~ ' r,. 02-07A BL / EDE ' 02-18B Date : - PROACTIVE DIAGNOSTIC SERVICES, INC., 130 W. INTERNATIONAL AtRPORT RD SUITE C, ANCHORAGE, AK 99518 PHONE: (907~245-8961 F~vc: (90T~245-88952 E-MAII ,_~_~ _ 1r ~...~._ WEBSITE ' __. _ ' ? <~_______ 50-029-201540 BL / EDE 50~29-20454-02 C~~Documenis and SetlingstOwner~Desktop\'Cransmit_BP.ducx ~f6Á Schlumberger Alaska Data & Consulting Services 2525 Gambell Street, Suite 400 Anchorage, AK 99503-2838 ATTN: Beth Well E-15B L5-05 02-07 A L5-09 OWDW-SE L5-09 L5-09 Y-06A Y-03A Job # 10861913 10866591 10772244 10672350 10672381 10679071 10893030 10913004 10877803 SCANNED JUN 1 7 2005 Log Description MCNL t 1q - D"¡ L RST I ?17 - qr/29 RST _ (qr;¡ - 107 RST 1'10-/2. 'f RST /170 - %"!J'1 RST 190'" / ¿ c.f RST /11)- /2..'1 SCMT -20 1- :;.5/ USIT .2.C)~- 2.35" PLEASE ACKNOWLEDGE RECEIPT BY SIGNING AND RETURNING ONE COpy EACH TO: BP Exploration (Alaska) Inc. Petrotechnical Data Center LR2-1 900 E. Benson Blvd. Anchorage, Alaska 99508 Date Delivered: 2! ~J[ j/IJ Uv /9ð-~C)7 02/11/05 NO. 3340 Company: State of Alaska Alaska Oil & Gas Cons Comm Attn: Helen Warman 333 West 7th Ave, Suite 100 Anchorage, AK 99501 Field: Prudhoe Bay Color Date Blueline Prints CD 06/05/04 1 09/05/04 1 1 04/07/04 1 1 01/25/04 1 1 05/03/04 1 1 04/06/04 1 1 09/12/04 1 1 01/24/05 1 12/13/04 1 ..~ '-" Alaska Data & Consulting Services 2525 Gambell Street., SU.it.e 400 ld:a. Anch~rage, AK ~9503y,38 ATT~ /1 /J ReC~d by/j.Jit < 1;:l1t-~ Schlumberger Alaska Data & Consulting Services 2525 Gambell Street, Suite 400 Anchorage, AK 99503-2838 A TTN: Beth /1;;--CiJ E-36 ('fc....OEZ-05 g'j -C41 R-13 'ÿfJ- IC 7 02-07 A iAf- /I ~ N-01A ~1.£{/f L5-05 t ~-ldr F-27 ,~ .It" - L- 0;1 D.S. 06-14A ?'i.t1'!J D.S. 02-27 A ''3".:L lL3 D.S. 03-22 ~l- C-ì5 E-08A }ú ';Y-7_E-19A I ¡ -,'" 1- '" Q C-08A ï']-G'- 0 Well Job # 10679044 10679035 10772272 10772244 10877782 10679070 10662946 10563157 10772247 10687697 10728384 10678042 10728385 S'CANNED JUN 1 ? 20û5 Log Description RST RST RST RST RST RST RST RST RST RST MCNL RST MCNL PLEASE ACKNOWLEDGE RECEIPT BY SIGNING AND RETURNING ONE COpy EACH TO: BP Exploration (Alaska) Inc. Petrotechnical Data Center LR2-1 900 E. Benson Blvd. Anchorage, Alaska 99508 Date Delivered: í ,~Þ5 hÇ / I I /yg-/ú7 02/03/05 NO. 3327 Company: State of Alaska Alaska Oil & Gas Cons Comm Attn: Helen Warman 333 West 7th Ave, Suite 100 Anchorage, AK 99501 Field: Prudhoe Bay Color Date BlueJine Prints CD 12/25/03 1 1 11/28/03 1 1 06/06/04 1 1 04/07/04 1 1 08/27/04 1 1 04/05/04 1 1 09/13/03 1 1 05/13/03 1 1 04/10/04 1 1 07/20/04 1 1 01/01/04 1 1 12/21/03 1 1 01/03/04 1 1 .~.I ~ Alaska Data & Consulting Services 2525 Gambell Str. eet.... SU..it.e 400 tL Anchorage, AK..-99S-P3_283718 ATTN: B~ ///1 ' / ReC¿dbY: /~ ·11 ~~ '-.- r, if ~ . STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMMISSION REPORT OF SUNDRY WELL OPERATIONS 1. Operations Performed: Abandon 0 SuspendD Operation ShutdownD Perforate ŒI WaiverD OtherD Alter CasingD Repair Well 0 Plug PerforationsŒ] Stimulate 0 Time ExtensionO Change Approved ProgramD Pull TubingD Perforate New PoolD Re-enter Suspended Well 0 2. Operator 4. Current Well Class: 5. Permit to Drill Number: Name: BP Exploration (Alaska), Inc. 198-1070 Development Œ] ExploratoryD 3. Address: P.O. Box 196612 6. API Number Anchorage, Ak 99519-6612 StratigraphicD ServiceD 50-029-20154-01-00 7. KB Elevation (ft): 9. Well Name and Number: 58.77 02-07A 8. Property Designation: 10. Field/Pool(s): ADL-028308 Prudhoe Bay Field / Prudhoe Oil Pool 11. Present Well Condition Summary: Total Depth measured 12805 feet true vertical 9005.5 feet Plugs (measured) 10440 Effective Depth measured 10440 feet Junk (measured) 12692 true vertical 9012.0 feet Casing Length Size MD TVD Burst Collapse Conductor 80 20" 91.5# H-40 27 - 107 27.0 - 107.0 1490 470 Liner 2478 7" 26# L-80 7270 - 9748 6736.5 - 8456.0 7240 5410 Liner 3230 4-1/2" 12.6# L-80 9572 - 12802 8314.7 - 9005.6 8430 7500 Production 1363 9-5/8" 47# R-S-95 26 - 1389 26.0 - 1389.0 8150 5080 Production 1022 9-5/8" 47# MN-80 1389 - 2411 1389.0 - 2411.0 6870 4760 Production 3838 9-5/8" 40# RS-95 2411 - 6249 2411.0 - 5848.5 6820 3330 Production 2472 9-5/8" 47# R-S-95 6249 - 8721 5848.5 - 7742.2 8150 5080 Surface 2710 13-3/8" 72# MN-80 26 - 2736 26.0 - 2736.0 5380 2670 Perforation depth: Measured depth: 10374-10386 RECEIVED True vertical depth: 8981.01 - 8987.27 Tubing (size, grade, and measured depth): 4-1/2" 12.6# L-80 @ 24 - 9576 JAN 1 5 2004 Packers & sssv (type & measured depth): 4-1/2" Baker S-3 Perm Packer @ 9521 AI k 0'1 & G Cons Commitsion 4-1/2" Liner Top Packer @ 9572 as a I as . ~ 7" Liner Top Packer @ 7270 Anchora e 12. Stimulation or cement squeeze summary: Intervals treated (measured): ; .'-, JAM 1 ~) 103\ Treatment descriptions including volumes used and final pressure: Sf&.... 13 Representative Daily Average Production or Injection Data Oil.Bbl Gas-Met Water-Bbl Casing Pressure Tubing Pressure Prior to well operation: 1236 49.3 49 1500 1654 Subsequent to operation: 1218 53.3 48 1500 705 14. Attachments: 15. Well Class after proposed work: ExploratoryD DevelopmentOO ServiceD Copies of Logs and Surveys run - 16. Well Status after proposed work: Operational Shutdown D OilŒ] GasD WAG D GINJD WINJD WDSPLD Daily Report of Well Operations. ! Prepared by Garry Catron (907) 564-4657. 17. I hereby certify that the foregoing is true and correct to the best of my knowledge. Sundry Number or N/A if C.O. Exempt: Contact Garry Catron N/A Printed Name Garr Catron Title Production Technical Assistant Signature 64-4657 Date 1/13/04 02-07 A DESCRIPTION OF WORK COMPLETED NRWO OPERATIONS EVENT SUMMARY 07/13/03 Drift w/3.625" Swage, 3-3/811 Dummy Gun, sample bailer, no sample to 10318 07/15/03 Make drift run w/3.625 Cent, SB to 105121 SLM. SB empty. Make drift run w/3-3/811 DG, SB to 10325, beat down and fall through. Set down at 1040T SLM, could not go deeper. SB empty. Make drift run w/2-7/811 DG, SB to 105021 SLM. (Target depth was 10470' SLM) RDMO. 07/24/03 Set clap @ 104401. Perforate 103741-1038616 SPF. FLUIDS PUMPED BBLS I No Fluids Pumped 0 I TOTAL Page 1 ... mæ= F~ I I WELLH~D= FMC ~~::" AXB.S~ 02-07 A . SAFETYNO1ES: BF. ELEV = ? KOP= ? Mix Angle = 99 @ 10698' D:ltum MD = 10203' 2064' 4-1/2 I-ES X NP, D = 3.813" D:ltum lV D = 8800' SS 13-3/8" CSG, 72#, tvN-80, ID= 12.347" 2736' GAS LIFT MA.N:>RELS ST MD lV D rev lY Æ VL V LATCH FORT DATE Minimum ID = 3.813" @ 2064' 1 3393 3386 14 MMG-M ~ 2 7012 6505 27 MMG-M ~ 4-1/2" H ES X NIP PLE 3 9329 8141 45 KBG-2-LS ~ TOP OF 7" LNR 7270' 19-5/8" X 7" BAKER LNRlHGRlPKR, D = 6.25" I 9-5/8" CSG, 47#, N-80,ID = 8.681" 7471' 7471' TOPOF SDETRACK WINDOW 9521' 7 X 4-1/2" BAKER 8-3 PKR, ID = 3.875" I 4-112"lBG, 12.6#, L-80,ID = 3.958" I 9576' 9554' 4-1/2" HES HP NIP, ID = 3.813" TOPOF4-1/2"LNR 9572' 9576' 4-1/2"TUBINGTAlLWLEG 9572' 7" X 4-1/2" BKR LNRlHGR FKR I l-i ELMD IT NOT LOGGBJ I I 7" LNR, 26#, L-80, ID = 6.276" I 9748' ÆRFORA TlON SUMMA.RY RB= LOG: SWSON01/12198 ANGLE AT TOP PERF: 58@ 10374' Note: Refer to Production œ for historieal pert data SIZE SPF INTERVAL Opn/Sqz DATE 2-718" 6 10374 -10386 0 07/24/03 10470' -i BKRCIBP (07/24/03) I 2-3/4" 4 10500 - 10612 0 08/02/98 2-3/4" 4 10650 - 10935 0 08/02/98 2-3/4" 4 11315-11485 0 08/02/98 2-3/4" 4 11540-11680 0 08/02/98 WFD 4-1/2" CIBP (CTMD) 2.3/4" 4 11715-12175 0 08/02/98 2-3/4" 4 12205 - 12375 0 08/02/98 2-3/4" 4 12400 - 12695 0 08/02/98 12713' 12805' 4-112" LNR, 12.6#, L-80, ID = 3.958" -i 12802' I DATE REV BY COMMENTS DATE REV BY COMMENTS PRUDHOE BAY UNIT 03130/75 ORIGINAL COMPLEIlON 06/05/03 CMO/TLP MAX ANGLE WELL: 02-07A 08104198 LAST WORKOVER 07/24/03 BJfvVKK SET aBP & A DÆRFS PERMT f\b: 1981070 04101/01 CI-VKAK CORRECTIONS 08/17/03 CMO/TLP DA TUv1 MD CORRECTION API f\b: 50-029-20154-01 09/26/02 BM/lP WAIVER SAFETY NOTE SEC35, T11N, R14E, 4139.49' FEL& 3113.14'FNL 11/12/02 /TLH DELETE WAIVER SAFETY NOTElI 03104103 JAF/KK MILL OUTCIBP; OORREcrlON8 II BP Exploration (Alaska) STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMMISSION REPORT OF SUNDRY WELL OPERATIONS 1. Operations performed: Operation shutdown_ Stimulate _ Plugging _ MILLED ClBP Pull tubing _ Alter casing _ Repair well _ 2. Name of Operator BP Exploration (Alaska), Inc. 3. Address P. O. Box 196612 Anchora~le, AK 99519-6612 4. Location of well at surface 1567' FNL, 4243' FEL, Sec. 36, T11N, R14E, UM At top of productive interval 4046' FNL, 1474' FEL, Sec. 35, T11N, R14E, UM At effective depth 3959' FNL, 4846' FEL, Sec. 36, T11N, R14E, UM At total depth 4045' FNL, 4778' FEL, Sec. 36, T11N, R14E, UM 5. Type of Well: Development _X Exploratory._ Stratigraphic__ Service_ (asp's 687803, 5949% (asp°s 685348, 5947457) ' (asp's 687262, 5947232) (asp's 687330, 5947146) 12. Present well condition summary Total depth: measured true vertical Effective depth: measured true vertical Casing Length Conductor 100' Surface 2704' Intermediate 7413' Liner 2478' SideTrack Liner 3230' 12805 feet 9005 feet Plugs (measured) 12695 feet Junk (measured) 9010 feet Perforate _ Other _X MILL ClBP 6. Datum elevation (DF or KB feet) RKB 77 feet 7. Unit or Property name Prudhoe Bay Unit 8. Well number 02-07a 9. Permit number / approval number 198-107 10. APl number 50-029-20154-01 11. Field / Pool Prudhoe Bay Field / Prudhoe Bay Pool Tagged PBTD @ 12695' CMTD (03/03/2003). Pushed CIBP to 12695~ CMTD (03/03/2003). Size Cemented Measured Depth True Vertical Depth 20" 431 sx PF 132' 132' 13-3/8" 2500 sx Fondu, 400 sx 2736' 2736' PF 'C' · 9-5/8" 1965 sx Class 'G', 300 sx 7445' 6895' PF 'C' 7" Uncemented 7270' - 9748' 6736' - 8456 4-1/2" 380 sx Class 'G' 9572'- 12802' 8315' - 9006' Perforation depth: measured Open Parrs 10500'-10612', 10650'-10935', 11315'-11485', 11540'-11680', 11715'-12175', Open Perfs (continued) 12205'-12375', 12400'-12695'. true vertical Open Perfs 9031 '-9024', 9015'-9024', 9024'-90131, 9013'-9011 ', 9010'-9008', Tubing (size, grade, and measured depth) Packers & SSSV (type & measured depth) Open Perfs (continued) 9009'-9006', 9005'-9010'. 4-1/2", 12.6#, L-80, TBG @ 9576' MD. 7" x 4-1/2" Baker 'S-3' Packer @ 9521' MD. 4-1/2" HES X NIPPLE @ 2064' MD. RECEIVED MAR 8 003 13. Stimulation or cement squeeze summary Intervals treated (measured) (see attached) Treatment description including volumes used and final pressure 14. Prior to well operation 02/23/2003 Subsequent to operation 03/09/2003 Reoresentative Dailv Averaoe Production 0rlniection Data OiI-Bbl Gas-Md Wate>Bbl 1104 42053 13 1123 42237 55 15. Attachments Copies of Logs and Surveys run _ Daily Report of Well Operations _ 16. Status of well classification as: Oil _X Gas _ Suspended _ Service 17. I hereby certify that the foregoing is true and correct to the best of my kpowledge. DeWa,~ R~ SChna~t~.~~~ Title: Technical Assistant-- Form 10-404 Rev 06/15/88 · .,. Casing Pressure Tubing Pressure 1359 1671 Date Mamh 10. 2003 Prepared by DeWayne R. Schnorr 564-517~ SUBMIT IN DUPLICATE 03/01 ~2003 03/02/2003 03/03/2003 03/04/2003 03/05/2003 0~01~3 0~02~3 03/03/03 03/04/03 02-07A DESCRIPTION OF WORK COMPLETED NRWO OPERATIONS MILL / UNDERREAM: MILL MILL / UNDERREAM: MILL MILL / UNDERREAM: MILL MILL / UNDERREAM: MILL TESTEVENT--- BOPD: 1,194, BWPD: 157, MCFPD: 47,663, AL Rate: EVENT SUMMARY MILL ClBP; MIRU DS CTU #8. FWHP= 2350 PSIG. SHUT-IN WELL IN. LOAD WELL WITH 150 BBLS KCL. RIH WITH 2-7/8" WEATHERFORD MOTOR WITH 3.625" BLADE JUNK MILL. RIH WITH 3.625" MILL. BEGIN MI~LLING CIBP @ 11,165' CTMD. HAD GOOD INDICATIONS INITIALLY OF MOTOR WORK WHILE MILLING. CIBP MAY HAVE BROKE LOOSE BUT HAS NOT MOVED. LOST ALL INDICATIONS OF MOTOR WORK. POOH TO INSPECT BHA. BHA STILL INTACT, LITTLE WEAR ON MILL. CUT 135' OF COIL OFF. MU NEW BHA, ADD SET OF U/D JARS, AND SAME MILL. RIH, START MILLING @ 11,169'. MILLED TO 11,170', THEN NO FURTHER MOTOR WORK. POOH. INSPECT MILL, GOOD WEAR ON LEADING EDGE AND SEVERAL BUTTONS BROKE OFF. MU BHA #3; SAME MOTOR ASSY. WITH 3 BLADE TAPERED JUNK MILL. TAGGED CIBP@ 11,176' CTMD. MILLED AND WORKED CIBP DOWN TO 11,295~. MAKING HEADWAY. CONTINUE MILLING AND PUSHING CIBP DOWNHOLE. PUSHED CIBP TO 11,625' CTMD, CIBP JAMMED. CONTINUED MILLING ON PLUG AND WORKED PIPE WITH SEVERAL STALLS. WORKED CIBP DOWNHOLE TO 12,357' CTMD. APPEARED TO BE BIT STUCK IN CIBP. JARRED OFF AND THEN BEGAN DRAGGING CIBP UPHOLE. WEDGED IT @ '12,312' CTMD. TOOK SEVERAL JAR LICKS TO GET FREE. POOH FOR BHA CHANGE. STICKY PULLING THROUGH PERFS. RIH WITH 3-1/8" VENTURI JUNK BASKET WITH 3.80' BURN SHOE. RIH PAST LAST DEPTH REACHED WHILE MILLING. NO INDICATIONS OF OBSTRUCTIONS OR RESTRICTIONS. CONTINUED RIH TO 12,600' CTMD, SAW SOME MOTOR WORK. WORKED TO ORIGINAL PBTD (12,695' CTMD). POOH WITH STILL PUMPING DOWN COIL. POOH WITH VENTURI JUNK BASKET. SAW 1250 PSIG LOSS IN COIL PRESSURE WHILE PULLING THROUGH TAILPIPE, CONTINUED POOH. AT SURFACE, LOST VENTURI JUNK BASKET, UNSREWED FROM MOTOR. RIH WITH OVERSHOT. TAGGED FISH -10,100 CTMD, PUSHED TO 12,687' WITH SEVERAL SIT DOWNS, JARS, AND PUMPING. POOH. TAGGED UP @ 9850' CTMD (LINER TOP), PUMP CRUDE DOWN BACKSIDE AND PULL THROUGH. ON SURFACE, RECOVERED VENTURI JUNK BASKET AND BURNED OVER SHOE. NO CIBP IN BURN SHOE, BUT JUNK BASKET FULL OF CIBP DEDRIS AND SAND. ASSUME CIBP IS ON BOTTOM, NO EVIDENCE OF EVER BURNING OVER IT. LOAD WELL TO 10,000' WITH CRUDE TO ASSIST Page 1 03/04/03 (continued) 02-07A DESCRIPTION OF WORK COMPLETED NRWO OPERATIONS POPPING. PERFORM WEEKLY BOP TEST. LEFT WELL SHUT-IN. NOTIFIED DSO OF WELL STATUS. WILL POP ASAP WITH PBGL ASSIST IF NECESSARY. <<< JOB COMPLETED >>> 03/05/03 TESTEVENT --- BOPD: 1,194, BWPD: 157, MCFPD: 47,663, AL Rate: 0 Fluids Pumped BBLS 165 60/40 METHANOL WATER 35 ICRUDE 2552 1% EXTRA SLICK KCL WATER 2752 TOTAL Page 2 STATE OF ALASKA ALASK~ OIL AND GAS CONSERVATION COMMISSION REPORT OF SUNDRY WELL OPERATIONS 1. Operations performed: Operation shutdown_ Stimulate_ Plugging _ Perforate_ Pull tubing _ Alter casing _ Repair well _ Other _X ClBP 2. Name of Operator 5. Type of Well: 6. Datum elevation (DF or KB feet) BP Exploration (Alaska), Inc. Development__X RKB 58.77 feet 3. Address Exploratory__ 7. Unit or Property name P. O. Box 196612 Stratigraphic__ Anchorage, AK 99519-6612 Service__ Prudhoe Bay Unit 4. Location of well at surface 8. Well number 1567' FNL, 4243' FEL, Sec. 36, T11 N, R14E, UM (asp's 687803, 5949636) 02-07A At top of productive interval 9. Permit number / approval number 4046' FNL, 1474' FEL, Sec. 35, T11 N, R14E, UM (asp's 685348, 5947457) 198-107 At effective depth 10. APl number 50-029-20154-01 At total depth 11. Field / Pool 4045' FNL, 4778' FEL, Sec. 36, T11N, R14E, UM (asp's 687330, 5947146) Prudhoe Bay Oil Pool 12. Present well condition summary Total depth: measured 12805 feet Plugs (measured) ClBP set @ 11 150' MD on 2/23/2001. true vertical 9005 feet Effective depth: measured 11150 feet Junk (measured) true vertical 9034 feet Casing Length Size Cemented Measured Depth True Vertical Depth_h_ ._ Conductor 100' 20" 500 Sx PF 1 00' 1 00' Surface 2677' 13-3/8" 590o Sx PF II 2736' 2736' Production 7386' 9-5/8" 1700 Sx Class G & 125 Sx PF II 7445' 6895' Liner 2478' 7" 283 SX C~ass G 9748' 8456' Liner 3230' 4-1/2" 385 Sx C~ass G 12802' 9006' Perforation depth: measured 10500'- 10612'; 10650'- 10935'; (Isolated under ClBP 11315'- 11485'; 11540'- 11680'; 11715'- 12175'; 12205'- 12375'; 12400'- 12695'). true vertical 9031' - 9024'; 9015' - 9024'; (Isolated under ClBP 9024' - 9013'; 9013' - 9011'- 9010' - 9008'; 9009' - 9006'; 9005' - 9010'). ;Tubing (size, grade, and measured depth) 4-1/2", 12.6#, L-80 Tbg @ 9576' MD. Packers & SSSV (type & measured depth) 7 X 4-1/2 BAKER S-3 PACKER @ 9521' MD. 4-1/2 HES X NIPPLE ID=3.813 @ 2064' MD. 13. Stimulation or cement squeeze summary Intervals treated (measured) (see attached) Treatment description including volumes used and final pressure 14. Representative Daily Average Production or Iniection Data OiI-Bbl Gas-Mcr Water-Bbl Casing Pressure Tubing Pressure Prior to well operation 1025 28915 0 - 2227 Subsequent to operation 2676 10086 65 - 829 15. Attachments 16. Status of well classification as: Copies of Logs and Surveys run __ Daily Report of Well Operations __X Oil __X Gas __ Suspended __ Service 17. I hereby certify that the foregoing is true and correct to the best of my knowledge. Sig.ed ~ ~~~¢.~ Title: DS2SurveillanceE~iC~CE IV~D Date Brian Carlson ~ ,., Prepared by Paul Rauf 564-5799 Form 10-404 Rev 06/15/88 · SUBMIT IN DUPLICA . 02-07A DESCRIPTION OF WORK COMPLETED SET CAST IRON BRIDGE PLUG FOR GAS SHUT OFF Date Event Summary 2/22/2001: 2/23/2001: A Cast Iron Bridge Plug was set for Gas Shut off as follows: MIRU CTU. PT'd equip to 3500 psi. Stabbed onto well. Loaded well w/1% KCL Water. RIH & tagged PBTD @ 12600' CTM. POOH w/CT. RIH w/Weatherford 4-1/2" CIBP to isolate the following open perforations located f/: 11315' - 11485' MD (Zone 2A) Reference Log: BHCS 3/20/1975. 11540' - 11680' MD (Zone 2A) 11715' - 12175' MD (Zone 2A) 12205' - 12375' MD (Zone 2A) 12400' - 12695' MD (Zone 2A) Set CIBP @ 11150' MD. Tagged & confirmed set. POOH w/CT. RDMOL CTU. Placed well BOL & obtained a valid well test. Page 1 Well Compliance Report File on Left side of folder 198-107-0 MD 52805 TVD 09005 Microfilm Roll / - PRUDHOE BAY UNIT 02-07A 50- 029-20154-01 BP EXPLORATION (ALASK Completion Date: /98 Completed Status: 1-OIL Current: _ Roll 2 / Name Interval Sent Received D 8798 -~.~-10 SPERY MPT/GR/EWR4 OH 12/9/98 12/8/98 D 8799 c2c5~ SPERRY MPT/GR/EWR4 PB1 OH 12/9/98 D 8800 L~-7 ~. SPERRY MPT/GR/EWR4 PB2 OH 12/9/98 L MCNL ~FF~AL 9450-12655 '[ /lll~ CH 2 2/23/99 L NGP-MD 748440493 PBI_'~I~,'~/~4q~ OH 12/16/98 L NGP-TVD 6930-9044 PB1, '4~ OH 12/16/98 L NGP/DGR/EWR4-MD 7484-11472 PB2q(t/q~' 7/~/~ OH 12/16/98 L NGP/DGR/EWR4-MD 7484-12805 ']/~[q ~' '7/JO/~ OH 12/16/98 6930-9018 PB2~/O[q~' 7/9'a/cig OH 12/16/98 o. ,16,96 L PEX-3DD/CN 9355-10714 7[t¢/qg o~ 2/23/99 L PEX-~T 9355-10714 OH 2/23/99 L PEX-BHCS 9355-10714 OH 2/23/99 L PEX-CN 9355-10714 OH 2/23/99 L PEX-MCFL 9355-10714 OH 2/23/99 L SSTVD ~ 9742-10656 OH 2/23/99 R SRVY~T ~~Y 7405.77-10493. PB1 / OH 5 8/27/98 R SRVY~T ~~Y 10599.70-11413.68 F~ 2 OH 5 8/27/98 R SRVY~T ~E~Y 10377.62q2805. OH 5 8/27/98 T 9002 ~ SC~ PEX-~T~HC. OH 2/23/99 T 9019 ~ SC~UM MCNL CH 2/23/99 Daily Well O ps .6~-- ~/~/~ Are D~ Ditch Samples Required?yes ~. Was the well cored? yes ~ Analysis Description,S, Comments: L NGP/DGR/EWR4-TVD FI~AL 12/8/98 12/8/98 3/3/99 12/17/98 12/17/98 12/17/98 12/17/98 12/17/98 12/17/98 2/24/99 2/24/99 2/24/99 2/24/99 2/24/99 2/24/99 9/3/98 9/3/98 9/3/98 2/24/99 3/3/99 And R~'eWtS'ff?-yt~'-mo T/C/D Tuesday, August 01, 2000 Page 1 of 1 2/23/99 GeoQuest 3940 Arctic Blvd Anchorage, AK 99503 ATTN: Sherrie NO. 12362 Compan~ Alaska Oil & Gas Cons Comm Attn: Lori Taylor 3001 Porcupine Drive Anchorage, AK 99501 Field: Prudhoe Bay Floppy LIS Well Job # Log Description Date BL Sepia Disk Tape SIGNE DATE: . ' ''--ll~' __ Alaska 0ii & Gas Please sign and return on,'copy of this transmittal to Sherrie at the above address or fax to (907) 562-6~?~nk you. 2/23/99 GeoQuest 3940 Arctic Blvd Anchorage, AK 99503 ATrN: Sherrie NO. 12359 Companl Alaska Oil & Gas Cons Camm Attn: Lori Taylor 3001 Porcupine Drive Anchorage, AK 99501 Field: Prudhoe Bay (Open Hole) LiS Well Job # Log Description Date BL Sepia Tape D.S. 2-07A 98421 PEX/AIT/BHC ~;~-~00~.- 980716 D.S. 2-07A 98421 PEX-AIT 980716 1 1 , , D.S. 2-07A 98421 PEX-MCFL 980716 1 1 D.S. 2-07A 98421 PEX-CNL 980716 1 1 , , D.S. 2-07A 98421 PEX-3 DET DEN CNL 980716 1 1 ,,. D.S. 2-07A 98421 PEX-BHC-SONIC 980716 1 1 ., . D.S. 2-07A 98421 PEX-SSTVD 980716 1 1 ,, . , , SIGNED: ~-'~~ Please sign and return one copy of this transmittal to Sherrie at the above address. Than~?~e DATE: t.~Ja,'ska 0il & Gas Co~s. Col~miu~io~ 0 I=11 I_L_ I IM 13 SEI~L/I r'~ S WEIJ~ LOG TRANSMII~AL To: December 16, 1998 State of Alaska Alaska Oil and Gas Conservation Comm. Atm.' Loft Taylor 3001 Porcupine Dr. _ Anchorage, Alaska 99501 ~/] 01 RE: MWD Formation Evaluation Logs D.S. 2-07A, 2-07A PB 1 & PB2, AK-MM-80266 The technical data listed below is being submitted herewith. Please address any problems or concems to the attention of.' Ali Turker, Sperry-Sun Drilling Services, 5631 Silverado Way, #G, Anchorage, AK 99518 DS 2-07A: 2" x 5" MD Resistivity & Gamma Ray Logs: 50-029-20154-01 1 Blueline 1 Folded Sepia 2" x 5" TVD Resistivity & Gamma Ray Logs: 50-029-20154-01 1 Blueline 1 Folded Sepia DS 2-07A PBI: 2" x 5"MD Gamma Ray Logs: 50-029-20154-70 1 Blueline 1 Folded Sepia 2" x 5" TVD Gamma Ray Logs: 50-029-20154-70 1 Blueline 1 Folded Sepia DS 2-07A PB2: 2" x 5" MD Resistivity & Gamma Ray Logs: 50-029-20154-71 1 Blueline 1 Folded Sepia 2" x 5" TVD Resistivity & Gamma Ray Logs: 50-029-20154-71 1 Blueline DEC 17 1998 .~Jaska ~ ,.,~., & Gas Cons. ~mmi~io~ Anch~ 5631 Silverado Way, Suite G · Anchorage, Alaska 99518 · (907) 273-3500 · Fax (907) 273-3535 A Halliburton Company 0 Fi I I--I-I IM G S I::: FI~/I C E S WELL LOG TRANSMITFAL To: State of Alaska Alaska Oil and Gas Conservation Comm. Atm.: Loft Taylor 3001 Porcupine Dr. Anchorage, Alaska 99501 MWD Formation Evaluation Logs -D.S. 02-07A, 02-07A PB 1 & PB2, December 9, 1998 AK-MM-80266 The technical data listed below is being submitted herewith. Please acknowledge receipt by returning a signed copy of this transmittal letter to the attention of.' Ali Turker, Sperry-Sun Drilling Services, 5631 Silverado Way, #G, Anchorage, AK 99518 3 LDWG formatted Discs with verification listings. API#: 50-029-20154-01, 50-029-20154-70 & 50-029-20154-71. DEC 08 q998 Alaska Oi} 5. L4as ~ons. Commission Anchora.~e 5631 Silverado Way, Suite G · Anchorage, Alaska 99518 · (907) 273-3500 · Fax (907) 273-3535 A Halliburton Company STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMMISSION WELL COMPLETION OR RECOMPLETION REPORT AND LOG RECEIV D ~,J I I'- t ii-t- 'Jilt" 1. Status of Well Classification of Service Well [~Oil ~-~ Gas E~]Suspended I~Abandoned E~] Service .-~:,k~ Oil ~ ~ ~ ..... 2. Name of Operator 7. Permit Number ~- -- .... ~u' ~nc~ora~ ARCO Alaska Inc. 98-107 , 3. Address 8. APl Number P.O. Box 196612, Anchorage, Alaska 99519-6612 ?~%::~.:: ............ 50-029-20154-01 4. Location of well at sudace ;~ '~'~'~,~;~.~g~ ~ ...... 3709'NSL, 4243'WEL, SEC. 36, TllN, R14E, UM J ~'~: , ~~ ~. UnitorkoaseNamo ~~ ~~ Prudhoe Bay Unit At top of productive inte~al ~ 10. Well Number 1593'NSL, 1474'WEL, SEO. 35, T11N, R14E, UM ~ ~~ } ~ 02-07A At total depth ~ ' ............... ~-~.~ ~ 11. Field and Pool 1228' NSL, 4780' WEL, SEC. 36, TllN, R14E, UM ~ Prudhoe Bay Field / Prudhoe Bay 5. Elevation in feet (indicate KB, DF, etc.) ~. Lease Designation and Serial No. Pool KBE = 58.77'~ ADL 028308 7/4/~8 7/2~/~8 8/4/~8 ~/A ~8c~ One 17. Total Depth (MD+WD) I18: Plu~ Back Dopth {MD+WD)I~ ~. Dboct~onal Sumay 120. Dopth where SSSV sot 121. lhicknass of ~ormafrost 12805 9005 FTJ 12713 9009 FTJ ~Yes ~NoJ (Nipple) 2064' MD J 1900' (Approx.) 22. Type Electric or Other Logs Run MWD, GR, DIR, RES/ALT, DT/BHC, CNL, LDL, GR, Caliper, SP, MRES, 4-Phase RES 23. CASING, LINER AND CEMENTING RECORD CASING SE~ING DEPTH HOLE SIZE WT. PER FT. G~DE TOP BOSOM SIZE CEMENTING RECORD AMOUNT PULLED 20" 94¢ N-40 Sudace 100' 32" 500 sx Permafrost 13-3/8" 723 MN-80 Sudace 2736' 17-1/2" 5900 sx Permafrost II 9-5/8" 47¢ / 40¢ N-80 / S00-95 Sudace 7445' 12-1/4" 1700 sx Class 'G', 125 sx Permafrost II 7" 26¢ L-80 7270' 9748' 8-1/2" 283 sx Class 'G' 4-1/2" 12.6~ L-80 9572' 12802 6" 385 sx Class 'G' 24. Pedorations open to Production (MD+~D of Top and 25. TUBING RECORD Bottom and inte~al, size and number) S~ZE DEPTH SET (MD) PACKER SET (MD) 2-3/4" Gun Diameter, 4 spf 4-1/2", 12.6¢, L-80 9576' 9521' MD ~D MD ~D 10500' - 10612' 9031' - 9024' 10650' - 10935' 9015' - 9024' 26. AC~D, FRACTURE, CEMENT SQUEEZE, ETC. 11315' - 11485' 9024' - 9013' DEPTH INTERVAL (MD) AMOUNT & KIND OF MATERIAL USED 11540'-11680' 9013'-9011' 11715' - 12175' 9010' - 9008' Freeze Protect with 170 Bbls of Diesel 12205' - 12375' 9009' - 9006' 12400' - 12695' 9005' - 9010' 27. PRODUCTION TEST 0~ J ~[~AL Date First Production ~Method of Operation (Flowing, gas lift, etc.) August 14, 1998~ Flowin~ Date of Test Hours Tested PRODUCTION FOR OIL-BBL GAS-MCF WATER-BBL CHOKE SIZE ~GAs-OIL ~TIO TEST PERIOD I Flow Tubing Casing Pressure CALCU~TED OIL-BBL GAS-MCF WATER-BBL O~L GRAVI~-API (CORR) Press. 24-Hou~ ~TE 28. CORE DATA Brief description of lithology, porosity, fractures, apparent dips and presence of oil, gas or water. Submit core chips. Form 10-407 Rev. 07-01-80 Submit In Duplicate 29. Geologic Markers 30. Formation Tests Measured True Vertical Include interval tested, pressure data, all fluids Marker Name Depth Depth recovered and gravity, GOR, and time of each phase. Sag River 9738' 8448' Shublik 9780' 8483' Sadlerochit 9859' 8554' Zone 3 10048' 8728' Zone 2 10148' 8812' Romeo 10364' 8977' Zone 1 10506' 9033' 31. List of Attachments Summary of Daily Drilling Reports, Surveys 32. I herebYsigned certify/4jhattheforegoing,i;s true andes~~---'"~~'-~-/-'¢'4 ,,- ~ correct to the best of my knowledge Jam Title Senior Drilling Engineer Date 0~07A 98-107 Prepared By Name/Number: Terrie Hubble, 564-4628 Well Number Permit No. / Approval No. INSTRUCTIONS GENERAL: This form is designed for submitting a complete and correct well completion report and log on all types of lands and leases in Alaska. ITEM 1: Classification of Service Wells: Gas injection, water injection, steam injection, air injection, salt water disposal, water supply for injection, observation, injection for in-situ combustion. ITEM 5: Indicate which elevation is used as reference (where not otherwise shown) for depth measurements given in other spaces on this form and in any attachments. ITEM 16 AND 24: If this well is completed for separate production from more than one interval (multiple completion), so state in item 16, and in item 24 show the producing intervals for only the interval reported in item 27. Submit a separate form for each additional interval to be separately produced, showing the data pertinent to such interval. ITEM 21: Indicate whether from ground level (GL) or other elevation (DF, KB, etc.). ITEM 23: Attached supplemental records for this well should show the details of any multiple stage cementing and the location of the cementing tool. ITEM 27: Method of Operation: Flowing, Gas Lift, Rod Pump, Hydraulic Pump, Submersible, Water Injection, Gas Injection, Shut-In, Other-explain. ITEM 28: If no cores taken, indicate 'none'. Form 10-407 Rev. 07-01-80 Progress Report Facility PB DS 02 Well 02-07A Page 1 Rig Nabors 22E Date 27 August 98 Date/Time 30 Jun 98 06:00-06:30 06:30-08:30 08:30-09:30 09:30-14:30 14:30-16:30 16:30-18:00 18:00-18:30 18:30-19:30 19:30-21:30 21:30-22:30 22:30-04:00 01 Jul 98 04:00-05:30 05:30-06:00 06:00-06:30 06:30-08:30 08:30-09:30 09:30-12:00 12:00-14:00 14:00-18:00 18:00-18:30 18:30-20:00 20:00-23:00 23:00-01:00 02 Jul 98 01:00-03:00 03:00-04:00 04:00-05:30 05:30-06:00 06:00-06:30 06:30-08:00 08:00-12:30 12:30-13:00 13:00-15:30 15:30-16:00 16:00-18:00 18:00-18:30 18:30-22:30 22:30-23:30 23:30-00:00 03 Jul 98 00:00-03:00 03:00-06:00 06:00-06:30 06:30-08:30 08:30-09:00 09:00-13:30 13:30-14:30 14:30-15:30 15:30-16:00 16:00-16:30 16:30-17:00 17:00-19:30 19:30-02:00 04 Jul 98 02:00-03:30 03:30-06:00 06:00-06:30 Duration 1/2 hr 2hr lhr 5hr 2hr 1-1/2 hr 1/2 hr lhr 2hr lhr 5-1/2 hr 1-1/2 hr 1/2hr 1/2 hr 2hr lhr 2-1/2 hr 2hr 4hr 1/2 hr 1-1/2 hr 3hr 2hr 2hr lhr 1-1/2 hr 1/2 hr 1/2 hr 1-1/2 hr 4-1/2 hr 1/2 hr 2-1/2 hr 1/2 hr 2hr 1/2 hr 4hr lhr 1/2 hr 3hr 3hr 1/2 hr 2hr 1/2 hr 4-1/2 hr lhr lhr 1/2 hr 1/2 hr 1/2 hr 2-1/2 hr 6-1/2 hr 1-1/2 hr 2-1/2 hr 1/2hr Activity Held safety meeting Installed Swab valve Removed Accessories Circulated at 8042.0 ft Tested Casing Installed Hanger plug Held safety meeting Bleed down well Removed Xmas tree Installed VR plug Rigged up BOP stack Removed Hanger plug Rigged up Tubing handling equipment Held safety meeting Removed Tubing hanger Rigged up Tubing handling equipment Pulled Tubing on retrieval string to 200.0 ft Installed Retrievable packer Tested All functions Held safety meeting Tested All functions Removed Seal assembly Installed Seal assembly Functioned Retrievable packer Tested Casing Tested Casing Retrieved Retrievable packer Held safety meeting Circulated at 8865.0 ft Laid down 2800.0 ft of Tubing Rigged up Tubing handling equipment Laid down 1693.0 ft of Tubing Rigged up Tubing handling equipment Laid down 1468.0 ft of Tubing Held safety meeting Laid down 1868.0 ft of Tubing Rigged down Tubing handling equipment Installed Wear bushing Conducted slickline operations on Slickline equipment - Tool run Rigged up Drillstring handling equipment Held safety meeting Rigged up sub-surface equipment - Other sub-surface equipment Tested MWD - Via string Ran Drillpipe to 5612.0 ft (5in OD) Serviced Top drive motor Ran Drillpipe in stands to 7471.0 ft Functioned M.W.D. tool Functioned Permanent packer Tested Permanent packer - Via annulus Circulated at 7445.0 ft Worked toolstring at 7484.0 fi Circulated at 7484.0 ft Pulled out of hole to 900.0 ft Held safety meeting Progress Report Facility PB DS 02 Well 02-07A Rig Nabors 22E Page 2 Date 27 August 98 Date/Time 06:30-08:00 08:00-09:00 09:00-10:00 10:00-11:30 11:30-14:00 14:00-06:00 05 Jul 98 06:00-06:30 06:30-18:00 18:00-18:30 18:30-06:00 06 Jul 98 06:00-06:30 06:30-15:00 15:00-16:00 16:00-17:30 17:30-18:00 18:00-18:30 18:30-19:00 19:00-21:00 21:00-22:00 22:00-01:00 07 Jul 98 01:00-02:00 02:00-03:30 03:30-06:00 06:00-06:30 06:30-18:00 18:00-18:30 18:30-22:00 22:00-23:00 23:00-23:30 23:30-00:30 08 Jul 98 00:30-02:30 02:30-03:00 03:00-06:00 06:00-06:30 06:30-08:00 08:00-10:30 10:30-13:00 13:00-14:00 14:00-17:00 17:00-17:30 17:30-21:00 21:00-22:00 22:00-23:30 23:30-02:30 09 Jul 98 02:30-03:30 03:30-03:45 03:45-06:00 06:00-06:15 06:15-08:00 08:00-10:00 10:00-10:30 10:30-11:30 11:30-14:30 14:30-15:00 Duration 1-1/2 hr lhr lhr 1-1/2 hr 2-1/2 hr 16hr 1/2 hr 11-1/2 hr 1/2 hr 11-1/2 hr 1/2 hr 8-1/2 hr lhr 1-1/2 hr 1/2 hr 1/2 hr 1/2 hr 2hr lhr 3hr lhr 1-1/2 hr 2-1/2 hr 1/2hr 11-1/2 hr 1/2hr 3-1/2 hr lhr 1/2 hr lhr 2hr 1/2 hr 3hr 1/2 hr 1-1/2 hr 2-1/2 hr 2-1/2 hr lhr 3hr 1/2 hr 3-1/2 hr lhr 1-1/2 hr 3hr lhr 1/4 hr 2-1/4 hr 1/4 hr 1-3/4 hr 2hr 1/2 hr lhr 3hr 1/2 hr Activity Pulled out of hole to 0.0 ft Serviced BOP stack Serviced Top drive Made up BHA no. 1 R.I.H. to 7484.0 ft Drilled to 7992.0 ft Held safety meeting Drilled to 8373.0 ft Held safety meeting Drilled to 9038.0 ft Held safety meeting Drilled to 9288.0 ft Circulated at 9288.0 ft Pulled out of hole to 7400.0 ft Serviced Top drive pipe handler Held safety meeting Serviced Top drive pipe handler Pulled out of hole to 0.0 ft Made up BHA no. 2 R.I.H. to 7400.0 ft Serviced Block line R.I.H. to 9288.0 ft Drilled to 9417.0 ft Held safety meeting Drilled to 9669.0 ft Held safety meeting Drilled to 9750.0 ft Circulated at 9750.0 ft Pulled out of hole to 9200.0 ft Circulated at 9750.0 ft Pulled out of hole to 7400.0 ft Held safety meeting Repaired Mechanical brake Held safety meeting Repaired Mechanical brake Pulled out of hole to 750.0 ft Pulled BHA Rigged up Casing handling equipment Ran Liner to 2457.0 ft (7in OD) Installed Liner hanger Ran Drillpipe in stands to 7350.0 ft Circulated at 7350.0 ft Ran Drillpipe in stands to 9750.0 ft Circulated at 9750.0 ft Mixed and pumped slurry - 104.000 bbl Functioned Liner hanger Circulated at 7270.0 ft Held safety meeting Pulled Drillpipe in stands to 2410.0 ft Laid down 2410.0 ft of 5in OD drill pipe Retrieved Wear bushing Serviced Drillfloor / Derrick Tested BOP stack Installed Wear bushing Progress Report Facility PB DS 02 Well 02-07A Rig Nabors 22E Page 3 Date 27 August 98 Date/Time 10 Jul 98 11 Jul 98 12 Jul 98 13 Jul 98 15:00-15:30 15:30-17:00 17:00-18:00 18:00-18:15 18:15-21:00 21:00-23:00 23:00-23:30 23:30-01:30 01:30-03:00 03:00-05:15 05:15-05:30 05:30-06:00 06:00-06:15 06:15-06:45 06:45-07:00 07:00-09:30 09:30-16:00 16:00-16:30 16:30-18:00 18:00-06:00 06:00-06:15 06:15-10:30 10:30-12:30 12:30-19:00 19:00-19:30 19:30-21:00 21:00-22:00 22:00-01:00 01:00-03:00 03:00-06:00 06:00-06:15 06:15-10:00 10:00-12:30 12:30-20:30 20:30-22:00 22:00-23:00 23:00-02:00 02:00-03:30 03:30-04:00 04:00-05:00 05:00-06:00 06:00-06:15 06:15-07:00 07:00-11:00 11:00-11:30 11:30-14:00 14:00-14:30 14:30-15:30 15:30-16:00 16:00-18:00 18:00-18:15 18:15-22:00 22:00-23:00 23:00-00:00 Duration 1/2 hr 1-1/2 hr lhr 1/4 hr 2-3/4 hr 2hr 1/2 hr 2hr 1-1/2 hr 2-1/4 hr 1/4 hr 1/2 hr 1/4 hr 1/2hr 1/4 hr 2-1/2 hr 6-1/2 hr 1/2 hr 1-1/2 hr 12hr 1/4 hr 4-1/4 hr 2hr 6-1/2 hr 1/2 hr 1-1/2 hr lhr 3hr 2hr 3hr 1/4 hr 3-3/4 hr 2-1/2 hr 8hr 1-1/2 hr lhr 3hr 1-1/2 hr 1/2 hr lhr lhr 1/4 hr 3/4 hr 4hr 1/2 hr 2-1/2 hr 1/2 hr lhr 1/2 hr 2hr 1/4 hr 3-3/4 hr lhr lhr Activity Serviced Top drive Made up BHA no. 3 Serviced Handling equipment Held safety meeting Singled in drill pipe to 3922.0 ft R.I.H. to 6774.0 ft Tested Liner Held drill (Stripping) R.I.H. to 9530.0 ft Drilled installed equipment - Landing collar Drilled to 9770.0 ft Circulated at 9770.0 ft Held safety meeting Circulated at 9770.0 ft Performed formation integrity test Circulated at 9770.0 ft Drilled to 10005.0 ft Pulled out of hole to 9750.0 ft R.I.H. to 10005.0 ft Drilled to 10139.0 ft Held safety meeting Drilled to 10161.0 ft Circulated at 10161.0 ft Pulled out of hole to 189.0 ft Pulled BHA Made up BHA no. 4 Serviced Top drive R.I.H. to 9740.0 ft Washed to 10161.0 ft Drilled to 10289.0 ft Held safety meeting Drilled to 10493.0 ft Circulated at 10493.0 ft Pulled out of hole to 188.0 ft Pulled BHA Serviced Block line Ran Drillpipe in stands to 10493.0 ft Circulated at 10493.0 ft Batch mixed slurry - 18.000 bbl Pulled Drillpipe in stands to 9793.0 ft Circulated at 9793.0 ft Held safety meeting Circulated at 9793.0 ft Pulled out of hole to 0.0 ft Installed BOP test plug assembly Tested BOP stack Installed Wear bushing Serviced Top drive Held safety meeting Made up BHA no. 5 Held safety meeting R.I.H. to 9750.0 ft Washed to 10012.0 ft Drilled cement to 10100.0 ft Progress Report Facility PB DS 02 Well 02-07A Page 4 Rig Nabors 22E Date 27 August 98 Date/Time 14 Jul 98 15 Jul 98 16 Jul 98 17 Jul 98 18 Jul 98 19 Jul 98 00:00-01:00 01:00-01:30 01:30-04:00 04:00-04:30 04:30-06:00 06:00-06:15 06:15-18:00 18:00-18:15 18:15-06:00 06:00-06:15 06:15-10:30 10:30-11:00 11:00-11:30 11:30-13:30 13:30-19:30 19:30-20:30 20:30-21:00 21:00-21:30 21:30-23:00 23:00-04:00 04:00-06:00 06:00-06:15 06:15-10:30 10:30-12:00 12:00-16:30 16:30-18:00 18:00-18:15 18:15-20:30 20:30-00:00 00:00-01:00 01:00-03:00 03:00-04:00 04:00-06:00 06:00-06:15 06:15-18:00 18:00-18:15 18:15-06:00 06:00-06:15 06:15-18:00 18:00-18:15 18:15-23:00 23:00-00:30 00:30-03:00 03:00-06:00 06:00-06:15 06:15-10:30 10:30-15:00 15:00-16:30 16:30-17:30 17:30-18:00 18:00-18:15 18:15-18:30 18:30-21:00 21:00-22:00 Duration lhr 1/2 hr 2-1/2 hr 1/2 hr 1-1/2 hr 1/4 hr 11-3/4 hr 1/4 hr 11-3/4 hr 1/4 hr 4-1/4 hr 1/2 hr 1/2 hr 2hr 6hr lhr 1/2 hr 1/2 hr 1-1/2 hr 5hr 2hr 1/4 hr 4-1/4 hr 1-1/2 hr 4-1/2 hr 1-1/2 hr 1/4 hr 2-1/4 hr 3-1/2 hr lhr 2hr lhr 2hr 1/4 hr 11-3/4 hr 1/4 hr 11-3/4 hr 1/4 hr 11-3/4 hr 1/4 hr 4-3/4 hr 1-1/2 hr 2-1/2 hr 3hr 1/4 hr 4-1/4 hr 4-1/2 hr 1-1/2 hr 1 hr 1/2 hr 1/4 hr 1/4 hr 2-1/2 hr 1 hr Activity Circulated at 10100.0 ft Pulled out of hole to 9720.0 ft Circulated at 9720.0 ft Drilled cement to 10127.0 ft Drilled to 10127.0 ft Held safety meeting Drilled to 10268.0 ft Held safety meeting Drilled to 10620.0 ft Held safety meeting Drilled to 10668.0 ft Pulled out of hole to 9750.0 ft R.I.H. to 10668.0 ft Circulated at 10668.0 ft Pulled out of hole to 196.0 ft Pulled BHA Serviced Drillfloor / Derrick Held safety meeting Made up BHA no. 6 R.I.H. to 9322.0 ft Functioned Formation logs Held safety meeting Functioned Formation logs Rigged down Logging/braided cable equipment Pulled out of hole to 91.0 ft Pulled BHA Held safety meeting Made up BHA no. 7 R.I.H. to 5850.0 ft Serviced Top drive R.I.H. to 10635.0 ft Took MWD survey at 10635.0 ft Drilled to 10720.0 ft Held safety meeting Drilled to 11088.0 ft Held safety meeting Drilled to 11247.0 ft Held safety meeting Drilled to 11313.0 ft Held safety meeting Drilled to 11396.0 ft Circulated at 11396.0 ft Logged hole with LWD: DIR/FE from 11336.0 ft to 10500.0 ft Pulled out of hole to 7075.0 ft Held safety meeting Repaired Draw works Pulled out of hole to 198.0 ft Downloaded MWD tool Pulled BHA Retrieved Wear bushing Held safety meeting Installed BOP test plug assembly Tested BOP stack Installed Wear bushing Facility PB DS 02 Progress Report Well 02-07A Rig Nabors 22E Page Date 5 27 August 98 Date/Time 20 Jul 98 21 Jul 98 22 Jul 98 23 Jul 98 24 Jul 98 25 Jul 98 22:00-23:00 23:00-00:00 00:00-01:00 01:00-05:30 05:30-06:00 06:00-06:15 06:15-06:30 06:30-07:30 07:30-14:00 14:00-16:00 16:00-21:00 21:00-22:00 22:00-22:30 22:30-23:00 23:00-04:00 04:00-06:00 06:00-06:30 06:30-07:15 07:15-08:30 08:30-12:00 12:00-15:30 15:30-17:00 17:00-19:30 19:30-00:00 00:00-00:30 00:30-01:30 01:30-02:30 02:30-05:00 05:00-05:30 05:30-06:00 06:00-06:30 06:30-08:30 08:30-09:00 09:00-09:30 09:30-18:00 18:00-18:30 18:30-06:00 06:00-06:30 06:30-16:30 16:30-18:00 18:00-18:30 18:30-00:30 00:30-02:00 02:00-05:00 05:00-06:00 06:00-06:30 06:30-08:00 08:00-09:00 09:00-18:00 18:00-18:30 18:30-06:00 06:00-06:30 06:30-18:00 18:00-18:30 Duration lhr lhr lhr 4-1/2 hr 1/2 hr 1/4 hr 1/4 hr 1 hr 6-1/2 hr 2hr 5hr lhr 1/2 hr 1/2 hr 5hr 2hr 1/2 hr 3/4 hr 1-1/4 hr 3-1/2 hr 3-1/2 hr 1-1/2 hr 2-1/2 hr 4-1/2 hr 1/2hr lhr lhr 2-1/2 hr 1/2 hr 1/2 hr 1/2 hr 2hr 1/2 hr 1/2 hr 8-1/2 hr 1/2 hr 11-1/2 hr 1/2 hr 10hr 1-1/2 hr 1/2 hr 6 hr 1-1/2 hr 3hr lhr 1/2 hr 1-1/2 hr lhr 9 hr 1/2 hr 11-1/2 hr 1/2 hr 11-1/2 hr 1/2 hr Activity Serviced Block line Made up BHA no. 8 Serviced Top drive R.I.H. to 11336.0 ft Washed to 11365.0 ft Held safety meeting Washed to 11396.0 ft Circulated at 11396.0 ft Drilled to 11472.0 ft Circulated at 11472.0 ft Pulled out of hole to 67.0 ft Downloaded MWD tool Pulled BHA Serviced Drillfloor / Derrick Ran Drillpipe in stands to 11472.0 ft Circulated at 11472.0 fi Held safety meeting Batch mixed slurry - 48.000 bbl Pulled out of hole to 9749.0 ft Circulated at 9749.0 fi Pulled out of hole to -0.0 ft Serviced Drillfloor / Derrick Made up BHA no. 9 R.I.H. to 9924.0 ft Washed to 10150.0 fi Circulated at 10150.0 ft Washed to 10390.0 fi Circulated at 10390.0 ft Pulled out of hole to 9748.0 ft Rest hole at 9748.0 ft Held safety meeting Rest hole at 9748.0 fi R.I.H. to 10380.0 ft Took MWD survey at 10305.0 ft Drilled to 10458.0 fi Held safety meeting Drilled to 10621.0 fi Held safety meeting Drilled to 10844.0 fi Circulated at 10844.0 fi Held safety meeting Pulled out of hole to -0.0 ft Made up BI-lA no. 10 R.I.H. to 7300.0 fi Serviced Top drive pipe handler Held safety meeting R.I.H. to 10650.0 fi Reamed to 10844.0 ft Drilled to 11015.0 fi Held safety meeting Drilled to 11142.0 fi Held safety meeting Drilled to 11364.0 fi Held safety meeting Progress Report Facility PB DS 02 Well 02-07A Rig Nabors 22E Page 6 Date 27 August 98 Date/Time 26 Jul 98 27 Jul 98 28 Jul 98 29 Jul 98 30 Jul 98 18:30-06:00 06:00-06:30 06:30-07:30 07:30-15:00 15:00-16:00 16:00-16:30 16:30-17:00 17:00-18:00 18:00-18:30 18:30-19:00 19:00-23:30 23:30-00:30 00:30-01:30 01:30-02:00 02:00-04:00 04:00-04:30 04:30-06:00 06:00-06:30 06:30-07:00 07:00-08:00 08:00-10:30 10:30-18:00 18:00-18:30 18:30-19:30 19:30-20:30 20:30-20:45 20:45-06:00 06:00-06:30 06:30-13:00 13:00-14:30 14:30-15:30 15:30-16:30 16:30-18:00 18:00-18:30 18:30-06:00 06:00-06:30 06:30-09:00 09:00-11:00 11:00-15:00 15:00-16:00 16:00-17:00 17:00-18:00 18:00-18:30 18:30-20:30 20:30-00:00 00:00-04:30 04:30-06:00 06:00-06:30 06:30-07:00 07:00-07:30 07:30-11:00 11:00-11:30 11:30-15:00 15:00-17:30 Duration 11-1/2 hr 1/2 hr lhr 7-1/2 hr lhr 1/2 hr 1/2 hr lhr 1/2 hr 1/2 hr 4-1/2 hr lhr lhr 1/2 hr 2hr 1/2hr 1-1/2 hr 1/2hr 1/2 hr 1 hr 2-1/2 hr 7-1/2 hr 1/2hr lhr lhr 1/4 hr 9-1/4 hr 1/2 hr 6-1/2 hr 1-1/2 hr 1 hr lhr 1-1/2 hr 1/2 hr 11-1/2 hr 1/2 hr 2-1/2 hr 2hr 4hr lhr lhr 1 hr 1/2hr 2 hr 3-1/2 hr 4-1/2 hr 1-1/2 hr 1/2 hr 1/2 hr 1/2 hr 3-1/2 hr 1/2 hr 3-1/2 hr 2-1/2 hr Activity Drilled to 11696.0 ft Held safety meeting Circulated at 11696.0 ft Pulled out of hole to 200.0 ft Pulled BHA Downloaded MWD tool Made up BHA no. 11 Retrieved Wear bushing Held safety meeting Rigged up Surface lines Tested All functions Serviced Top drive pipe handler Retrieved Wear bushing Made up BHA no. 11 Tested M.W.D. tool - Via string Tested M.W.D. tool - Via string R.I.H. to 5830.0 ft Held safety meeting R.I.H. to 5830.0 ft Serviced Block line R.I.H. to 11200.0 ft Reamed to 11696.0 ft Held safety meeting Circulated at 11696.0 ft Pulled out of hole to 10983.0 ft Reamed to 11696.0 ft Drilled to 12031.0 ft Held safety meeting Drilled to 12316.0 ft Circulated at 12316.0 ft Pulled out of hole to 11364.0 ft R.I.H. to 12316.0 ft Drilled to 12411.0 ft Held safety meeting Drilled to 12664.0 ft Held safety meeting Drilled to 12805.0 ft Circulated at 12805.0 ft Pulled out of hole to 9648.0 ft Dropped EMMS survey barrel R.I.H. to 12805.0 ft Circulated at 12805.0 ft Held safety meeting Circulated at 12805.0 ft Pulled out of hole to 9748.0 ft Pulled out of hole to 190.0 ft Pulled BHA Held safety meeting Rigged up Casing handling equipment Held safety meeting Ran Liner to 3209.0 ft (4-1/2in OD) Rigged up Tubing handling equipment Ran Tubing to 3095.0 ft (2-7/8in OD) Ran Liner to 5633.0 ft (4in OD) Progress Report Facility PB DS 02 Well 02-07A Page 7 Rig Nabors 22E Date 27 August 98 Date/Time 31 Jul 98 01 Aug 98 02 Aug 98 17:30-18:00 18:00-18:30 18:30-23:00 23:00-00:00 00:00-02:30 02:30-04:30 04:30-05:30 05:30-06:00 06:00-06:30 06:30-06:35 06:35-06:37 06:37-06:41 06:41-06:52 06:52-07:13 07:13-07:32 07:32-07:50 07:50-08:00 08:00-08:30 08:30-10:30 10:30-13:30 13:30-16:00 16:00-19:00 19:00-22:00 22:00-23:00 23:00-00:00 00:00-01:00 01:00-04:30 04:30-06:00 06:00-06:30 06:30-07:30 07:30-11:00 11:00-12:00 12:00-12:30 12:30-13:00 13:00-15:00 15:00-18:00 18:00-18:30 18:30-22:00 22:00-22:30 22:30-00:30 00:30-06:00 06:00-06:30 06:30-07:30 07:30-09:00 09:00-11:30 11:30-12:00 12:00-12:30 12:30-13:00 13:00-13:30 13:30-18:00 18:00-18:30 18:30-21:00 21:00-22:00 22:00-23:00 Duration 1/2 hr 1/2 hr 4-1/2 hr lhr 2-1/2 hr 2hr lhr 1/2 hr 1/2 hr 0hr 0hr 0hr 0hr 1/4 hr 1/4 hr 1/4 hr 0hr 1/2 hr 2 hr 3hr 2-1/2 hr 3hr 3hr lhr lhr lhr 3-1/2 hr 1-1/2 hr 1/2 hr lhr 3-1/2 hr lhr 1/2 hr 1/2 hr 2hr 3hr 1/2 hr 3-1/2 hr 1/2 hr 2hr 5-1/2 hr 1/2 hr 1 hr 1-1/2 hr 2-1/2 hr 1/2 hr 1/2 hr 1/2 hr 1/2 hr 4-1/2 hr 1/2 hr 2-1/2 hr 1 hr 1 hr Activity Ran Liner to 6045.0 ft (4-1/2in OD) Held safety meeting Ran Liner to 9748.0 ft (4-1/2in OD) Circulated at 9748.0 ft Ran Liner to 12805.0 ft (4-1/2in OD) Circulated at 12805.0 ft Rigged up Cement mixing system Batch mixed slurry - 79.000 bbl Held safety meeting Pumped Brine spacers - volume 5.000 bbl Tested Surface lines Pumped Brine spacers - volume 15.000 bbl Pumped Synthetic based mud spacers - volume 50.000 bbl Mixed and pumped slurry - 78.000 bbl Displaced slurry - 166.000 bbl Functioned Liner hanger Functioned Liner hanger Functioned Setting tools Circulated at 12695.0 ft Pulled Drillpipe in stands to 9550.0 ft Circulated at 9550.0 ft Pulled Drillpipe in stands to 3240.0 ft Pulled Tubing in stands to -0.0 ft Rigged down Tubing handling equipment Tested Liner - Via string Serviced Block line Rigged up sub-surface equipment - Gun assembly Ran Tubing to 3220.0 ft (2-7/8in OD) Held safety meeting Installed Retrievable packer Ran Drillpipe in stands to 12712.0 ft Rigged up Surface lines Space out tubulars Perforated Circulated at 9281.0 ft Pulled out of hole to 9515.0 ft Held safety meeting Pulled out of hole to 3253.0 ft Rigged down sub-surface equipment - Retrievable packer Pulled out of hole to 2195.0 ft Rigged down sub-surface equipment - Gun assembly Held safety meeting Rigged down sub-surface equipment - Gun assembly Ran Drillpipe in stands to 3157.0 ft Laid down 3157.0 ft of 4in OD drill pipe Rigged down Drillstring handling equipment Removed Wear bushing Rigged up Completion string handling equipment Held safety meeting Ran Tubing to 7000.0 ft (4-1/2in OD) Held safety meeting Ran Tubing to 9576.0 ft (4-1/2in OD) Space out tubulars Rigged up Tubing hanger Progress Report Facility PB DS 02 Well 02-07A Rig Nabors 22E Page 8 Date 27 August 98 Date/Time 03 Aug 98 04 Aug 98 23:00-02:00 02:00-02:30 02:30-03:00 03:00-03:30 03:30-06:00 06:00-06:30 06:30-11:30 11:30-13:00 13:00-14:00 14:00-14:30 14:30-15:00 15:00-15:10 15:10-15:30 15:30-16:00 16:00-17:00 17:00-18:00 18:00-18:30 18:30-20:00 20:00-06:00 06:00-07:00 Duration 3hr 1/2 hr 1/2 hr 1/2 hr 2-1/2 hr 1/2 hr 5hr 1-1/2 hr 1 hr 1/2 hr 1/2 hr 0hr 1/4 hr 1/2 hr lhr lhr 1/2 hr 1-1/2 hr 10hr lhr Activity Circulated at 9576.0 ft Functioned Permanent packer Tested Tubing Installed Hanger plug Removed BOP stack Held safety meeting Removed BOP stack Installed Adapter spool Installed Xmas tree Removed Hanger plug Installed Hanger plug Tested Xmas tree Removed Hanger plug Rigged up High pressure lines Tested Casing Freeze protect well - 170.000 bbl of Diesel Held safety meeting Installed Hanger plug Rigged down Top drive Held safety meeting (~ALASKA~ _eared trices rilling BP Exploration / Arco To: Alaska Oil & Gas Conservation Commission Date: October 1, 1998 From: Terrie Hubble Technical Assistant Subject: ~#98-107,~ RECEIVED 0CT 0 1 1998 Alaska 0il & Gas Cons. 6ornmissior~ Anchorage Enclosed, in duplicate, is a corrected directional survey which has been received from the vendor, Schlumberger / Anadrill. This is not the survey which was used to calculate the TVD's and below surface locations so it was not necessary to correct the 10-407. They are simply being submitted for your records. The well histories and logs have previously been filed with the Commission and there are no changes. Thank you. /tlh WELL INFORMATION TD Date: Client: Field: Well Name: Permanent datum: Depth measured from: Elevation of kelly bushing: Elevation of rig floor: Elevation of ground level: Magnetic Declination: Grid Convergence: Total Correction: TIE IN POINT Measured Depth: True Vertical Depth: Inclination: Azimuth: N/S d isplacement: E/W displacement: Azimuth from rotory table to target: Anadrill/Schlumberger Survey Report 13-Jul-98 Shared Services Drilling Prudhoe Bay DS02-07A Mean Sea Level RKB 58.77 58.77 29.17 28.05 0.00 28.05 0.00 0.00 0.00 0.00 0.00 0.00 90.00 ORIGINAL Measured Station Station Station Vertical Vertical Latitude Departure Depth Inclination Azimuth Interval Depth Section (N/-S) (E/-W) (ft) (deg) (deg) (ft) (ft) (ft) (ft) (ft) 10022.18 26.25 328.20 0.00 8704.06 10056.70 29.31 334.10 34.50 8734.58 10089.21 31.81 341.60 32.50 8762.58 10119.65 33.39 347.10 30.50 8788.28 10135.76 33.38 351.70 16.10 8801.72 10155.65 31.95 357.50 19.90 10187.95 31.86 9.80 32.30 10219.82 33.79 19.50 31.80 10250.68 37.65 27.30 30.90 10284.03 42.48 32.30 33.30 10316.50 48.49 33.60 32.50 10345.69 53.86 36.30 29.20 10377.62 58.30 35.80 31.90 8818.48 8845.93 8872.67 8897.77 8923.25 8946.03 8964.33 8982.13 -2618.44 -2626.15 -2632.33 -2636.75 -2638.38 -2639.40 -2638.32 -2633.93 -2626.73 -2616.05 -2603.44 -2590.40 -2574.82 -2406.86 -2392.77 -2377.48 -2361.67 -2352.97 -2342.29 -2325.33 -2308.71 -2292.21 -2273.65 -2254.22 -2235.60 -2214.20 Total At displ Azim (ft) (deg) Dog Leg Severity (deg/100f) -2603.44 3443.75 229.11 18.71 -2590.39 3421.70 229.20 19.75 -2574.82 3395.94 229.31 13.98 -2639.39 3528.84 228.41 17.29 -2638.32 3516.80 228.61 20.10 -2633.93 3502.53 228.76 17.59 -2626.73 3486.25 228.89 19.30 -2616.05 3466.01 229.01 17.42 -2618.44 3556.57 227.41 0.00 -2626.15 3552.75 227.66 11.92 -2632.33 3547.06 227.91 14.02 -2636.75 3539.76 228.15 11.01 -2638.37 3535.18 228.27 15.72 10408.35 63.59 37.10 30.70 8997.03 -2558.88 -2192.63 -2558.88 3369.79 10440.47 68.45 37.10 32.20 9010.11 -2541.14 -2169.17 -2541.14 3341.06 Measured Station Station Station Vertical Vertical Latitude Departure Total Depth Inclination Azimuth Interval Depth Section (N/-S) (E/-W) dispi (ft) (deg) (deg) (ft) (ft) (ft) (ft) (ft) (ft) 10472.47 72.84 40.10 32.00 9020.72 -2522.30 -2145.59 -2522.30 3311.43 10514.45 78.05 46.20 42.00 9031.28 -2494.50 -2115.97 -2494.50 3271.07 10535.63 80.25 45.50 21.10 9035.25 -2479.64 -2101.54 -2479.64 3250.39 10570.40 80.05 46.30 34.80 9041.20 -2455.01 -2077.68 -2455.01 3216.18 10599.70 81.82 46.60 29.30 9045.82 -2434.04 -2057.74 -2434.04 3187.30 Projected to TD 10668.00 88.50 52.00 68.30 9051.58 -2382.49 -2013.42 -2382.49 3119.31 **** SURVEY DEPTHS WERE SHIFTED +12 FT, BECAUSE OF AN INCORRECT DRILLERS TALLY 229.41 229.52 At Azim (deg) 229.61 229.69 229.72. 229.76 229.79 229.80 17.62 15.09 Dog Leg Severity (deg/100f) 16.32 18.74 10.92 2.34 6113 12.56 27-Aug-98 AOGCC Lori Taylor 3001 Porcupine Drive Anchorage, AK 99501 Re: Distribution of Survey Data for Well 02-07A Dear Lori Taylor: Enclosed are two survey hard copies. Tie-on Survey: Window / Kickoff Survey: Projected Survey: 10,377.62' MD 10,380.00' MD 12,805.00' MD (if applicable) Please call me at 563-3256 if you have any questions or concerns. Regards,  .-'z....--'"'~ - William T. Allen Survey Manager Attachment(s) 5631 Silverado Way, Suite G · Anchorage, Alaska 99518 · (907) 563-3256 · Fax (907) 563-7252 A Division of Dresser Industries, Inc. Prudhoe Bay Unit Alaska State Plane Zone 4 PBU EOA DS 02 02-07A ORIGINAL SURVEY REPORT 26 August, 1998 Your Reft API-500292015401 Last Survey Date 29-July.98 Job# AKMMS0266 KBE. 58.77' ~p,=,r-,r-,~-=~un DRILLING SERVICES Survey Reft svy3693 Sperry. Sun Drilling Services Survey Report for 02-07A Your Ref: AP1-500292015401 Prudhoe Bay Unit Alaska State Plane Zone 4 PBU EOA DS 02 Measured Depth (ft) Incl. Azim. Sub-Sea Depth Vertical Depth (ft) Local Coordinates Global Coordinates Dogleg Vertical Northings Eastings Northings Eastings Rate Section (ft) (ft) (ft) (ft) (°/100ft) (ft) Comment 10377.62 58.300 35.800 8923.39 8982.16 10380,00 58.555 35.887 8924.63 8983.40 10408.01 61.550 36.910 8938.62 8997.39 10443.18 67.850 35.470 8953.64 9012.41 10456.00 69.190 32.440 8958.33 9017.10 10475.07 71.050 29.540 8964.82 9023.59 10505.88 74.180 26.960 8974.03 9032.80 10538.13 80.020 24.820 8981.22 9039.99 10569.54 87.100 25.590 8984.74 9043.51 10602.44 93.520 25.280 8984.57 9043.34 10632.64 95.890 28.450 8982.09 9040.86 10661.67 99.410 31.640 8978.22 9036.99 10697.97 99.840 38.030 8972.15 9030.92 10727.93 95.240 42.940 8968.22 9026.99 10760.28 91.420 47.490 8966.34 9025.11 10791.92 92.280 53.490 8965.31 9024.08 10799.24 92.740 54.170 8964.99 9023.76 10823.84 93.480 59.050 8963,66 9022.43 10857.50 91.320 63.610 8962.25 . 9021.02 10889.89 87,850 65.510 8962.48 9021.25 10921.17 86.490 70.670 8964.03 9022.80 10955.57 85.660 76.050 8966.38 9025.15 10987.34 86.610 80.680 8968,53 9027.30 11016.11 87.100 85.990 8970.11 9028.88 11049.29 87.440 91.930 8971.69 9030.46 11081.48 87.840 96.940 8973.01 9031,78 11112.98 89.140 102.360 8973.84 9032.61 11144.41 90.090 105.000 8974,06 9032.83 11176.88 90.860 105,690 8973.79 9032.56 11208.65 93.330 105.910 8972.62 9031.39 2214.17 S 2574.84W 5947358.09 N 685284.18 E -2574.84 2212.53 S 2573.65W 5947359.76 N 685285.33 E 11.138 -2573.65 2193.00 S 2559.25W 5947379.65 N 685299.24 E 11.153 -2559.25 2167.34 S 2540.49W 5947405.76 N 685317.35 E 18.291 -2540.49 2157.45 S 2533.83W 5947415.82 N 685323.76 E 24.350 -2533.83 2142.08 S 2524.60W 5947431.42 N 685332.60 E 17.309 -2524.60 2116.18 S 2510.69W 5947457.65 N 685345.86 E 12.925 -2510.69 2087.91S 2496.98W 5947486.26 N 685358.87 E 19.228 -2496.98 2059.69 S 2483.70W 5947514.80 N 685371.44 E 22.672 -2483.70 2029.99 S 2469.57W 5947544.84 N 685384.82 E 19.536 -2469.57 2003.15 S 2455.98W 5947572.01N 685397.74 E 13.077 -2455.98 1978.25 S 2441.58W 5947597.27 N 685411.51 E 16.297 -2441.58 1948.89 S 2421.15W 5947627.13 N 685431.21E 17.396 -2421.15 1926.32 S 2401.87W 5947650.17 N 685449.91 E 22.351 ~2401.87 1903.58 S 2378.96W 5947673.48 N 685472.25 E 18.344 -2378.96 1883.47 S 2354.57W 5947694.19 N 685496.13 E 19.147 -2354.57 1879.15 S 2348.67W 5947698.65 N 685501.92 E 11.208 -2348.67 1865.64S 2328.16W 5947712.67 N 685522.08 E 20.035 -2328.16 1849.51S 2298.67W 5947729.53 N 685551.17 E 14.979 -2298.67 1835.60 S 2269.42W 5947744.17 N 685580.06 E 12.214 -2269.42 1823.94 S 2240.45W 5947756.54 N 685608.73 E 17.040 -2240.45 1814.12 S 2207.58W 5947767.18 N 685641.35 E 15.788 -2207.58 1807.73 S 2176.54W 5947774.34 N 685672.21E 14.844 -2176.54 1804.40 S 2148.02W 5947778.39 N 685700.64 E 18.508 -2148.02 1803.79 S 2114.90W 5947779.81N 685733.74 E 17.911 -2114.90 1806.28 S 2082.84W 5947778.13 N 685765.85 E 15.600 -2082.84 1811.56 S 2051.81W 5947773.63 N 685797.00 E 17.688 -2051.81 1818.99 S 2021.28W 5947766.96 N 685827.71E 8.927 -2021.28 1827.58 S 1989.96W 5947759.15 N 685859.23 E 3.184 -1989.96 1836.23 S 1959.42W 5947751.27 N 685889.98 E 7.805 -1959.42 Tie-on Survey Window Point Continued... 26 August, 1998 - 23:13 - 2 - DrillQuest Prudhoe Bay Unit Measured Sub-Sea Ve~ical Depth Incl. Azim. Depth Depth (~) (fi) 11241.48 93.730 105.530 8970.60 9029.37 11273.22 94.110 105.350 8968.43 9027.20 11303.62 94.270 105.540 8966.21 9024.98 11340.03 94.720 104.910 8963.36 9022.13 11367.38 95.410 105.350 8960.94 9019.71 11398.95 95.040 104.900 8958.07 9016.84 11432.27 92.270 107.890 8955.95 9014.72 11461.70 91.290 110.130 8955.03 9013.80 11495.00 90.710 109.340 8954.45 9013.22 11527.86 90.740 109.210 8954.03 9012.80 11558.30 90.830 109.820 8953.62 9012.39 11589.91 90.860 109.370 8953.15 9011.92 11621.31 90.890 109.860 8952.67 9011.44 11655.56 90.650 106.830 8952.21 9010.98 11683.56 90.280 107.030 8951.98 9010.75 11715.33 91.940 107.070 8951.37 9010.14 11748.20 91.970 106.870 8950.25 9009.02 11778.40 91.850 106.750 8949.24 9008.01 11811.22 92.030 107.200 8948.13 9006.90 11843.63 91.600 107.750 8947.10 9005.87 11875.04 91.630 108.290 8946.22 9004.99 11906.90 91.720 108.130 8945.29 9004.06 11938.85 91.010 107.800 8944.52 9003.29 11971.38 90.650 108.830 8944.05 9002.82 12004.97 89.510 108.390 8944.01 9002.78 12035.98 88.000 108.400 8944.68 9003.45 12066.43 87.910 108.550 8945.77 9004.54 12099.48 87.880 108.730 8946.98 9005.75 12130.96 87.840 108.160 8948.16 9006.93 12160.70 88.000 108.350 8949.24 9008.01 Sperry-Sun Drilling Services Survey Report for 02-07A Your Ref: API-500292015401 Local Coordinates Nothings (fi) 1845.10 S 1853.53 S 1861.61S 1871.14 S 1878.25 S 1886.45 S 1895.84S 1905.42 S 1916.66 S 1927.51S 1937.68 S 1948.28 S 1958.82 S 1969.59 S 1977.75 S 1987.06 S 1996.65 S 2005.38 S 2014.95 S 2024.68 S 2034.39 S 2044.35 S 2054.20 S 2064.42 S 2075.14 S 2084.92 S 2094.56 S 2105.12 S 2115.07 S 2124.38 S Global Coordinates Dogleg Ve~ical Eastings Nothings Eastings Rate Section (fi) (fi) (fi) (°/100fi) (fi) 1927.88W 5947743.18 N 685921.74 E 1.679 -1927.88 1897.35W 5947735.52 N 685952.46 E 1.324 -1897.35 1868.13W 5947728.17 N 685981.88 E 0.816 -1868.13 1833.11W 5947719.52 N 686017.13 E 2.122 -1833.11 1806.81W 5947713.07 N 686043.59 E 2.989 -1806.81 1776.46W 5947705.62 N 686074.14 E 1.841 -1776.46 1744.56W 5947697.04 N 686106.26 E 12.219 -1744.56 1716.76W 5947688.15 N 686134.30 E 8.304 -1716.76 1685.42W 5947677.70 N 686165.91E 2.943 -1685.42 1654.40W 5947667.63 N 686197.18 E 0.406 -1654.40 1625.71W 5947658.18 N 686226.11E 2.025 -1625.71 1595.94W 5947648.32 N 686256.15 E 1.427 -1595.94 1566.36W 5947638.53 N 686285.97 E 1.563 -1566.36 1533.86W 5947628.56 N 686318.74 E 8.874 -1533.86 1507.07W 5947621.08 N 686345.72 E 1.502 -1507.07 1476.71W 5947612.53 N 686376.31 E 5.227 -1476.71 1445.29W 5947603.73 N 686407.96 E 0.615 -1445.29 1416.39W 5947595.72 N 686437.06 E 0.562 -1416.39 1385.02W 5947586.93 N 686468.66 E 1.476 -1385.02 1354.12W 5947577.98 N 686499.79 E 2.153 -1354.12 1324.26W 5947569.01N 686529.88 E 1.721 -1324.26 1294.01W 5947559.82 N 686560.37 E 0.576 -1294.01 1263.63W 5947550.73 N 686590.99 E 2.450 -1263.63 1232.75W 5947541.28 N 686622.12 E 3.354 -1232.75 1200.92W 5947531.36 N 686654.21E 3.638 -1200.92 1171.50W 5947522.31 N 686683.86 E 4.870 -1171.50 1142.64W 5947513.39 N 686712.95 E 0.574 -1142.64 1111.34W 5947503.62 N 686744.50 E 0.552 -1111.34 1081.50W 5947494.41 N 686774.58 E 1.814 -1081.50 1053.28W 5947485.81 N 686803.03 E 0.835 -1053.28 Comment Alaska State Plane Zone 4 PBU EOA DS 02 Continued... 26 August, 1998 - 23:13 - 3 - DrillQuest Sperry-Sun Drilling Services Survey Report for 02-07A Your Ref: AP1-500292015401 Prudhoe Bay Unit Measured Sub-Sea Vertical Local Coordinates Depth Incl. Azim. Depth Depth Northings Eastings (ft) (ft) (ft) (ft) (ft) 12194.72 88.710 108.780 8950.21 9008.98 2135.21S 1021.04W 12225.07 89.350 109.930 8950.73 9009.50 2145,27 S 992.41W 12256.14 91.420 111.130 8950.52 9009.29 2156.16 S 963.32W 12290.29 92.520 111.440 8949.34 9008.11 2168.55 S 931.52W 12321.51 91.970 110,730 8948.12 9006.89 2179.77 S 902.41W 12352.58 90.770 111.490 8947.38 9006.15 2190.96 S 873.43W 12384.75 90.830 113.610 8946.93 9005.70 2203.30 S 843.73W 12416.28 91.080 116.560 8946.40 9005.17 2216.66 S 815.18W 12447.24 91.010 119.530 8945.84 9004.61 2231.21S 787.86W 12479.89 89.170 121.990 8945.79 9004.56 2247.91S 759,81W 12511.79 87,530 124.600 8946.71 9005.48 2265.41S 733,16W 12542.21 86.920 128.240 8948.18 9006.95 2283.45 S 708.71W 12573.66 87.290 131.380 8949.77 9008.54 2303.55 S 684.59W 12605.22 88.150 135,030 8951.02 9009.79 2325.14 S 661.61W 12636.10 89.230 138.030 8951.73 9010.50 2347.54S 640.37W 12670.03 91.230 141.650 8951.59 9010.36 2373.47 S 618.49W 12702.02 92.250 143.060 8950.62 9009.39 2398.78 S 598.96W 12732.08 92.740 142.950 8949.31 9008.08 2422.77 S 580.89W 12748.67 92.680 143.260 8948.53 9007.30 2436.02 S 570.94W 12805.00 92.680 143.260 8945.90 9004.67 2481.11S 537.28W Global Coordinates Dogleg Vertical Northings Eastings Rate Section (fi) (fi) (°/t00ff) (fi) 5947475.79N 686835,53 E 2.440 -1021,04 5947466,45N 686864.40E 4.336 -992.41 5947456.29 N 686893.75E 7.701 -963.32 5947444.69 N 686925.86 E 3,346 -931.52 5947434.20 N 686955.23 E 2.875 -902.41 5947423.74 N 686984.48 E 4.571 -873.43 5947412.15 N 687014,48 E 6.592 -843,73 5947399.50 N 687043.36 E 9.388 -815.18 5947385,64 N 687071.03 E 9.594 -787.86 5947369.64 N 587099.49 E 9,409 -759.81 5947352.81N 687126.57 E 9.660 -733.16 5947335.39 N 687151.46 E 12.119 -708.71 5947315.89 N 687176.07 E 10,041 -684.59 5947294.89 N 687199,59 E 11,873 -661.61 5947273.02 N 687221.38 E 10.323 -640.37 5947247,65 N 687243.89 E 12,189 -618.49 5947222.83 N 687264.05 E 5.438 -598,96 5947199.30 N 687282.71E 1.671 -580.89 5947186.30 N 687292,99 E 1.901 -570.94 5947142.06 N 687327.76 E 0.000 -537.28 All data is in feet unless otherwise stated. Directions and coordinates are relative to True North. Vertical depths are relative to Well. Northings and Eastings are relative to Well. The Dogleg Severity is in Degrees per 100ft. Vertical Section is from Well and calculated along an Azimuth of 90.000° (True). Based upon Minimum Curvature type calculations, at a Measured Depth of 12805.00ft., The Bottom Hole Displacement is 2538.62ft., in the Direction of 192.219° (True). Comment Projected Survey Alaska State Plane Zone 4 PBU EOA DS 02 Continued... 26 August, 1998 - 23:13 - 4 - DrillQuest Prudhoe Bay Unit Sperry-Sun Drilling Services Survey Report for 02-07A Your Ref: API-500292015401 Alaska State Plane Zone 4 PBU EOA DS 02 Comments Measured Depth (fi) 10377.62 10380.00 12805.00 Station Coordinates TVD Northings Eastings Comment (ft) (ft) (ft) 8982.16 2214.17 $ 2574.84 W Tie-on Survey 8983.40 2212.53 S 2573.65 W Window Point 9004.67 2481.11 S 537.28 W Projected Survey 26 August, 1998 - 23:13 - 5 - DrillQuest D I=! I I_1_ I I~ I~ S 1~ I::! ~.~ I r' EE S 27-Aug-98 AOGCC Lori Taylor 3001 Porcupine Drive Anchorage, AK 99501 Re: Distribution of Survey Data for Well 02-07APB1 Dear Lori Taylor: Enclosed are two survey hard copies. Tie-on Survey: Window / Kickoff Survey: Projected Survey: 7,405.77' MD 7,445.97' MD 10,493.00' MD (if applicable) Please call me at 563-3256 if you have any questions or concerns. Regards, William T. Allen Survey Manager Attachment(s) 5631 Silverado Way, Suite G · Anchorage, Alaska 99518 · (907) 563-3256 ° Fax (907) 563-7252 A Division of Dresser Industries, Inc. Prudhoe Bay Unit Alaska State Plane Zone 4 PBU EOA DS 02 02-07APBI ORIGINAL SURVEY REPORT 24 August, 1998 Your Reft API-500292015470 Last Survey Date 12-July-98 Job# AKMMS0266 KBE. 58.77' DRILLING SERVICES Survey Reft svy3668 Prudhoe Bay Unit Measured Depth Incl. Azim. (fi) 7405.77 25.020 220.970 7445.97 24.850 220,620 7462.52 25,710 221.240 7482.17 24.940 221.980 7514.01 25.160 223.170 7546.26 26.910 224.380 7580.20 29,130 225,560 7612,42 30,820 226.770 7641.61 33.730 227.860 7676.45 36.330 228.740 7708.44 38.880 230.370 7740.14 41.340 231.670 7771.88 43.560 233.890 7804.58 45.440 236.360 7833.60 46.660 238.740 7868.15 48.710 240.310 7899.40 49.980 244.280 7927.36 51.190 244.500 7991.84 52.800 245.420 8023.67 53.030 245.710 8119.39 55.170 247.080 8212.18 55.230 246.850 8308.90 55.850 249.930 8403,59 54.670 246.160 8498.95 54.220 246.560 8592.94 52.860 244.120 8688,47 51.370 246.220 8783.71 50,630 248.130 8879.97 49.580 248,000 8973.81 49.360 246.650 Sperry-Sun Drilling Services Sub-Sea Ve~ical Local Coordinates Depth Depth Nothings Eastings (fi) (fi) (fi) 6800.84 6859.61 1776.21S 998.17W 6837.29 6896.06 1789.04S 1009.24W 6852.26 6911.03 1794.38S 1013.87W 6870,02 6928.79 1800.66S 1019.45W 6898.86 6957.63 1810.59 S 1028.58W 6927.84 6986.61 1820.81S 1038.37W 6957.80 7016.57 1832.08 S 1049.64W 6985.71 7044.48 1843.23 S 1061.26W 7010.39 7069.16 1853.79 $ 1072.72W 7038.91 7097.68 1867.09 S 1087.65W 7064.26 7123.03 1879.74 S 1102.51W 7088.50 7147.27 1892.58 S 1118.39W 7111.92 7170.69 1905.53 S 1135.45W 7135.24 7194.01 1918.63 S 1154.25W 7155.39 7214.16 1929.83 S 1171.88W 7178.64 7237.41 1942.78 S 1193.90W 7199.01 7257.78 1953.79 S 1214.89W 7216.76 7275.53 1963.13 S 1234.37W 7256.46 7315.23 1984.63 S 1280.40W 7275.66 7334.43 1995.13 S 1303.51W 7331,78 7390.55 2026.17 S 1374.56W 7364.74 7443.51 2055.98 S 1444.68W 7439.47 7498,24 2085.34S 1518,81W 7493.45 7552.22 2114.40 S 1590.96W 7548.90 7607.67 2145.51S 1662.03W 7604.75 7663.52 2177.04 S 1730.73W 7663.42 7722.19 2208.71 S 1799.14W 7723.36 7782.13 2237.42 S 1867.35W 7785.10 7843,87 2265.01S 1935,86W 7846.08 7904,85 2292.50 S 2001,67W Survey Report for 02-07APB1 Your Ref: API-500292015470 Global Coordinates Nothings Eastings (fi) (fi) 5947835.25 N 686849.43 E 5947822.15 N 686838.68 E 5947816.70 N 686834.19 E 5947810.27 N 686828.77 E 5947800.12 N 686819.90 E 5947789.66 N 686810.36 E 5947778.11N 686799.37 E 5947766.68 N 686788.04 E 5947755.84 N 686776.85 E 5947742.17 N 686762.25 E 5947729.15 N 686747.71E 5947715.91N 686732.16 E 5947702.54 N 686715.42 E 5947688.98 N 686696.95 E 5947677.34 N 686679.61E 5947663.85 N 686657.92 E 5947652.31N 686637.21E 5947642.50 N 686617.98 E 5947619.85 N 686572.49 E 5947608.78 N 686549.65 E 5947575.98 N 686479.39 E 5947544.43 N 686410.04 E 5947513.23 N 686336.67 E 5947482.37 N 686265.26 E 5947449.50 N 686194.99 E 5947416.27 N 686127.10 E 5947382.91N 686059.50 E 5947352.50 N 685992.03 E 5947323.21N 685924.23 E 5947294.08 N 685859.13 E Dogleg Ve~ical Rate Section (°/t 0,0fi) (al -998.17 0.560 -1009.24 5.437 -1013.87 4.237 -1019.45 1.727 -1028.58 5.670 -1038.37 6.741 -1049.64 5.570 -1061.26 10.166 -1072.72 7.602 -1087.65 8.556 -1102.51 8.197 -1118.39 8.438 -1135.45 7.815 -1154.25 7.248 -1171.88 6.818 -1193.90 10.458 -1214.89 4.370 -1234.37 2.738 -1280.40 1.025 -1303.51 2.518 -1374.56 0.214 -1444.68 2.703 -1518.81 3.501 -1590.96 0.582 -1662.03 2.540 -1730.73 2.333 -1799.14 1.741 -1867.35 1.096 -1935.86 1.118 -2001.67 Comment Tie-on Survey Window Point Alaska State Plane Zone 4 PBU EOA DS 02 Continued... 24 August, 1998 - 8:47 - 2 - DrillQuest Prudhoe Bay Unit Measured Sub-Sea Ve~ical Depth Incl. Azim. Depth Depth (~) (fi) 9067.73 49.960 246.020 7906.88 7965.65 9161.99 48.560 248.040 7968.40 8027.17 9225.72 47.100 249.470 8011.18 8069.95 9261.16 46.720 249.970 8035.39 8094.16 9356.50 45.520 249.200 8101.48 8160.25 9421.53 45.200 252.980 8147.18 8205.95 9451.76 45.160 255.480 8168.49 8227.26 9483.40 44.490 257.340 8190.93 8249.70 9514.39 42.980 259.640 8213.32 8272.09 9545.56 41.720 260.790 8236.36 8295.13 9578.39 40.070 262.230 8261.17 8319.94 9612.08 38.070 264.830 8287.33 8346.10 9642.03 37.260 266.030 8311.04 8369.81 9690.13 35.490 268.560 8349.77 8408.54 9731.32 33.650 269.740 8383.68 8442.45 9761.34 32.810 270.600 8408.79 8467.56 9794.87 30.480 271.570 8437.34 8496.11 9824.93 26.220 278.020 8463.79 8522.56 9855.84 22.680 283.110 8491.93 8550.70 9887.64 19.570 287.240 8521.59 8580.36 9920.24 19.970 299.230 8552.28 8611.05 9950.63 20.880 308.470 8580.77 8639.54 9978.95 23.150 320.500 8607.03 8665.80 10010.18 26.250 328.230 8635.41 8694.18 10044.70 29.310 334.080 8665.96 8724.73 10077.21 31.810 341.580 8693.96 8752.73 10107.65 33.390 347.090 8719.61 8778.38 10139.80 33.760 349.090 8746.39 8805.16 10169.81 33.920 352.490 8771.32 8830.09 10201.95 35.340 358.980 8797.78 8856.55 Sperry-Sun Drilling Services Survey Report for 02-07APB1 Your Ref: API-500292015470 Local Coordinates Nothings Eastings (fi) 2321.24 $ 2067.23W 2349.12 S 2132.98W 2366.24 S 2176.99W 2375.21S 2201.27W 2399.17 S 2265.67W 2414.17 S 2309.43w 2420.00 S 2330.06W 2425.24 S 2351.74W 2429.52 S 2372.73W 2433.09 S 2393.42w 2436.27 S 2414.67W 2438.67 S 2435.77W 2440.13 S 2454.01W 2441.49 S 2482.50W 2441.84S 2505.86W 2441.79 S 2522.31W 2441.46 S 2539.90W 2440.33 S 2554.11W 2438.02 S 2566.68W 2435.05 S 2577.74W 2430.71S 2587.81W 2424,81S 2596.59W 2417.37 S 2604.08W 2406,76 S 2611.63W 2392.66 S 2619.34W 2377.37 S 2625.53W 2361.59 S 2629.94W 2344.19 S 2633.61W 2327.70 S 2636.28W 2309.51S 2637.62W Global Coordinates Dogleg Ve~ical Northings Eastings Rate Section (fi) (fi) (°/100fi) 5947263.72N 685794.30E 0.818 -2067.23 5947234.21N 685729.27 E 2.200 -2132.98 5947216.00 N 685685.70 E 2.831 -2176.99 5947206.42 N 685661.65 E 1.487 -2201.27 5947180.86 N 685597.87 E 1.387 -2265.67 5947164.78 N 685554.50 E 4.165 -2309.43 5947158.44 N 685534.02 E 5.867 -2330.06 5947152.66 N 685512.48 E 4.654 -2351.74 5947147.85 N 685491.60 E 7.075 -2372.73 5947143.77 N 685471.01E 4.745 -2393.42 5947140.06 N 685449.84 E 5.788 -2414.67 5947137.13 N 685428.81E 7.674 -2435.77 5947135.22 N 685410.61E 3.648 -2454.01 5947133.15 N 685382.17 E 4.823 -2482.50 5947132.21N 685358.82 E 4.753 -2505.86 5947131.85 N 685342.37 E 3.208 -2522.31 5947131.74 N 685324.78 E 7.113 -2539.90 5947132.52 N 685310.55 E 17.436 -2554.11 5947134.51N 685297.93 E 13.318 -2566.68 5947137.21N 685286.79 E 10.837 -2577.74 5947141.29 N 685276.61E 12.480 -2587.81 5947146.98 N 685267.70 E 11.013 -2596.59 5947154.23 N 685260.02 E 17.786 -2604.08 5947164.65 N 685252.21E 14.317 -2611.63 5947178.55 N 685244.14 E 11.864 -2619,34 5947193.68 N 685237.57 E 14.013 -2625.53 5947209.35 N 685232.77 E 11,043 -2629.94 5947226.65 N 685228.67 E 3.628 -2633.61 5947243.07 N 685225.59 E 6,331 -2636.28 5947261.22 N 685223.80 E 12.290 -2637.62 Comment Alaska State Plane Zone 4 PBU EOA DS O2 Continued... 24 August, 1998 - 8:47 - 3 - DrillQuest Sperry-Sun Drilfing Services Survey Report for 02-07APB'I Your Ref: API-500292015470 Prudhoe Bay Unit Measured Sub-Sea Vertical Depth Incl. Azim. Depth Depth (ft) (ft) Local Coordinates Global Coordinates Northings Eastings Northings Eastings (ft) (ft) (ft) (ft) 10235.21 37,680 4.620 8824.52 8883,29 2289.75 S 2636.97W 5947280.99 N 685223.95 E 10266.51 39.980 10.050 8848.90 8907.67 2270.31S 2634.44W 5947300.49 N 685225.99 E 10299.37 43.300 14.120 8873.46 8932.23 2248.97 S 2629.85W 5947321.93 N 685230.05 E 10329.94 46.260 17.560 8895.16 8953.93 2228.27 S 2623.96W 5947342.77 N 685235.43 E 10363.94 49.950 20.800 8917.87 8976.64 2204.38 S 2615.63W 5947366.86 N 685243.16 E 10395.25 53.800 22.190 8937.19 8995,96 2181.47 S. 2606.60W 5947389.98 N 685251.62 E 10424.88 57.680 22.830 8953.87 9012.64 2158.86 S 2597,22W 5947412.83 N 685260.42 E 10493.00 57.680 22.830 8990.29 9049.06 2105.80 S 2574.89W 5947466.43 N 685281,43 E All data is in feet unless otherwise stated. Directions and coordinates are relative to True North. Vertical depths are relative to Well. Northings and Eastings are relative to Well. The Dogleg Severity is in Degrees per 100ft. Vertical Section is from Well and calculated along an Azimuth of 90.000° (True). Based upon Minimum Curvature type calculations, at a Measured Depth of 10493.00ft., The Bottom Hole Displacement is 3326.33ft., in the Direction of 230.723° (True). Dogleg Rate (°/100k) 12.294 13,122 13,027 12,511 12.963 12.782 13.216 0,000 Vertical Section -2636.97 -2634.44 -2629.85 -2623.96 -2615.63 -2606.60 -2597.22 -2574.89 Comment Projected Survey Alaska State Plane Zone 4 PBU EOA DS 02 ConEnued... 24 August, 1998 - 8:47 - 4 - Dr~llQuest Prudhoe Bay Unit Sperry-Sun Drilling Services Survey Report for 02-07APB 1 Your Ref: API-500292015470 Alaska State Plane Zone 4 PBU EOA DS 02 Comments Measured Depth (ft) 7405.77 7445.97 10493,00 Station Coordinates TVD Northings Eastings (ft) (ft) (ft) 6859.61 1776.21 S 998.17 W 6896.06 1789.04 S 1009.24 W 9049.06 2105.80 S 2574.89 W Comment Tie-on Survey Window Point Projected Survey 24 August, 1998 - 8:47 - 5 - Dr#lQuest 27-Aug-98 AOGCC Lori Taylor 3001 Porcupine Drive Anchorage, AK 99501 Re: Distribution of Survey Data for Well 02-07APB2 Dear Lori Taylor: Enclosed are two survey hard copies. Tie-on Survey: Window / Kickoff Survey: Projected Survey: 10,599.70' MD 'MD 11,413.68' MD (if applicable) Please call me at 563-3256 if you have any questions or concerns. Regards, William T. Allen Survey Manager Attachment(s) 5631 Silverado Way, Suite G · Anchorage, Alaska 99518 ° (907) 563-3256 ° Fax (907) 563-7252 A Division of Dresser Industries, Inc. Prudhoe Bay Unit Alaska State Plane Zone 4 PBU EOA DS 02 02-07APB2 ORIGINA'L SURVEY REPORT 26 August, 1998 Your Ref: API-500292015471 Last Survey Date 20-July-98 Job# AKMMS0266 KBE - 58.77' Sl:)emm~-surn DRICL. ING SERVICES Sun/ey Ref: svy3689 Prudhoe Bay Unit Measured Depth Incl. (fi) 10599.70 81.820 10638.02 86.120 10668.01 89.420 10699.60 90.250 10734.21 90.650 10766.23 92.130 10798.76 91.110 10830.50 90.680 10863.08 91.620 10894.94 89.940 10925.44 89.010 10958.54 88.120 10989.88 90.580 11020.29 93.360 11053.58 95.610 11085.13 95.020 11115.23 94.770 11146.65 92.960 11178.54 90.650 11211.28 89.510 11243.42 90.030 11275.62 92.950 11307.75 94.250 11329.60 94.650 11370.39 95.160 11399.42 95.630 11413.68 96.240 Sperry-Sun Drilling Services Sub-Sea VeKical Local Coordinates Azim. Depth Depth Nothings Eastings (~) (fi) (~) (fi) 46.600 8987.07 9045.84 2057.72 S 2434.08W 50.360 8991.09 9049.86 2032.48 S 2405.56W 55.420 8992.26 9051.03 2014.40 S 2381.67W 57.480 8992.35 9051.12 1996.95 S 2355.34W 54.960 8992.08 9050.85 1977.71S 2326.58W 52.310 8991.30 9050.07 1958.73 S 2300.80W 50.040 8990.38 9049.15 1938.34 S 2275.47W 53.040 8989.89 9048.66 1918.61S 2250.63W 56.470 8989.23 9048.00 1899.81S 2224.03W 59.180 8988.80 9047.57 1882.85 S 2197.07W 61.710 8989.08 9047.85 1867.81S 2170.54W 64.840 8989.91 9048.68 1852.93 S 2140.99W 67.440 8990.26 9049.03 1840.26 S 2112.33W 69.890 8989.22 9047.99 1829.20 S 2084.03W 72.950 8986.62 9045.39 1818.63 S 2052.58W 76.180 8983.69 9042.46 1810.27 S 2022.30W 78.450 8981.12 9039.89 1803.88 S 1993.04W 81.830 8979.01 9037.78 1798.32 S 1962.16W 83.020 8978.00 9036.77 1794.11S 1930.57W 85.530 8977.96 9036.73 1790.85 S 1898.00W 88.680 8978.08 9036.85 1789.23 S 1865.90W 91.200 8977.25 9036.02 1789.19 S 1833.72W 91.800 8975.23 9034.00 1790.03 S 1801.66W 91.380 8973.53 9032.30 1790.64S 1779.89W 92.800 8970.05 9028.82 1792.12 S 1739.28W 93.840 8967.32 9026.09 1793.79 S 1710.42W 95.920 8965.84 9024.61 1795.00 S 1696.29W Survey Report for 02.07APB2 Your Ref: API-500292015471 Global Coordinates Dogleg Ve~ical Nothings Eastings Rate Section (fi) (fi) (°/100fi) 5947518.00 N 685420.99 E -2434.08 5947543.95 N 685448.88 E 14.868 -2405.56 5947562.61N 685472.31E 20.131 -2381.67 5947580.72 N 685498.19 E 7.030 -2355.34 5947600.68 N 685526.47 E 7.372 -2326.58 5947620.29 N 685551.76 E 9.477 -2300.80 5947641.30 N 685576.57 E 7.648 -2275.47 5947661.65 N 685600.92 E 9.547 -2250.63 5947681.10 N 685627.04 E 10.914 -2224.03 5947698.73 N 685653.57 E 10.007 -2197.07 5947714.43 N 685679.71 E 8.837 -2170.54 5947730.04 N 685708.89 E 9.828 -2140.99 5947743.43 N 685737.22 E 11.420 -2112.33 5947755.19 N 685765.23 E 12.182 -2084.03 5947766.54 N 685796.41 E 11.386 -2052.58 5947775.65 N 685826.47 E 10.364 -2022.30 5947782.97 N 685855.56 E 7.560 -1993.04 5947789.10 N 685886.29 E 12.181 -1962.16 5947794.09 N 685917.77 E 8.147 -1930.57 5947798.17 N 685950.25 E 8.420 -1898.00 5947800.59 N 685982.30 E 9.933 -1865.90 5947801.43 N 686014.47 E 11.976 -1833.72 5947801.39 N 686046.53 E 4.455 -1801.66 5947801.33 N 686068.32 E 2.650 -1779.89 5947800.86 N 686108.95 E 3.687 -1739.28 5947799.91N 686137.84 E 3.917 -1710.42 5947799.05 N 686152.00 E 15.125 -1696.29 Comment Tie-on Survey Projected Survey Alaska State Plane Zone 4 PBU EOA DS 02 Continued... 26 August, 1998 - 22:46 - 2 - DrillQuest Sperry-Sun Drilling Services Survey Report for 02-07APB2 Your Ref: API-500292015471 Prudhoe Bay Unit All data is in feet unless otherwise stated. Directions and coordinates are relative to True North. Vertical depths are relative to Well. Northings and Eastings are relative to Well. The Dogleg Severity is in Degrees per 100ft. Vertical Section is from Well and calculated along an Azimuth of 90.000° (True). Based upon Minimum Curvature type calculations, at a Measured Depth of 11413.68ft., The Bottom Hole Displacement is 2469.70ft., in the Direction of 223.381° (True). Comments Measured Depth (ft) 10599.70 11413.68 Station Coordinates TVD Northings Eastings Comment (ft) (ft) (ft) 9045.84 2057.72 S 2434.08 W Tie-on Survey 9024.61 1795.00 S 1696.29 W Projected Survey Alaska State Plane Zone 4 PBU EOA DS 02 26 August, 1998 - 22:46 - 3 - DrillQuest MEMORANDUM TO: David Joh~ton, Chairman State of Alaska Alaska Oil and Gas Conservation Commission DATE: July 26, 1998 THRU: Blair Wondzell, -¢~ P. I. Supervisor 7('z~/[f~ FROM: Larry Wade,~'~ SUBJECT: Petroleum I n~pecto/""~~ FILE NO: .DOC BOP Test Nabors 22E PBU 02-07A /PTD 98-107 July 26,1998: I traveled to ARCO's PBU DS-2 to witness a BOP test on Nabors 22E. The floor valve failed and they got another from the yard. Qther than that everything held but the test was long due to the inexperience of the driller and crew. SUMMARY: Witnessed a BOP test on Nabors 22E, 1 failure, 5 hours. Attachments: aeoggzfe.xls · CC, NON-CONFIDENTIAL STATE OF ALASKA OIL AND GAS CONSERVATION COMMISSION BOPE Test Report OPERATION: Drlg: Drlg Contractor: Operator: Well Name: Casing Size: Test: Initial X Workover: Nabors ARCO 02-07A 7" Set @ Weekly Rig No. 22E PTD # Rep.: Rig Rep.: 9, 748 Location: Sec. X Other TEST DATA: DATE: 7/26/98 98-107 Rig Ph.# 659-4454 Ron Jay Larry Wurdernan 36 T. 11N R. 14E Meridian Umiat MISC. INSPECTIONS: Location Gen.: ok Housekeeping: ok (Gen) PTD On Location Standing Order Posted X BOP STACK: Quan. Annular Preventer Pipe Rams Lower Pipe Rams Blind Rams 1 Choke Ln. Valves HCR Valves 2 Kill Line Valves 1 Check Valve Well Sign Drl. Rig ok Hazard Sec. X Test Press. P/F 250/2500 P 250/5,000 P 250/5,000 P 250/5, 000 P 250/5, 000 P 250/5,000 250/5, 000 250/5, 000 MUD SYSTEM: Visual Alarm Trip Tank X X' Pit Level Indicators X' X' Flow Indicator X X Meth Gas Detector X' X H2S Gas Detector X FLOOR SAFETY VALVES: Upper Kelly/IBOP Lower Kelly/IBOP Ball Type Inside BOP Test Quan. Pressure P/F 1 250/5, 000 P 1 250/5, 000 P 1 F P I , 250/5, 000 CHOKE MANIFOLD: No. Valves No. Flanges Manual Chokes Hydraulic Chokes Test Pressure P/F 18 250/5, 000 P 42 250/5, 000 P 2 P Functioned Functioned ACCUMULATOR SYSTEM: System Pressure Pressure After Closure 200 psi Attained After Closure System Pressure Attained Blind Switch Covers: Master: Nitgn. Btl's: 2,800 1,400 minutes 25 sec. minutes 20 sec. x Remote: x 4 @ 19oo 4 @ 1800 Psig. TEST RESULTS , Number of Failures: ~ ,Test Time: 5.0 Hours. Number of valves tested 24 Repair or Replacement of Failed Equipment will be made within 0.5 days. Notify the Inspector and follow with Written or Faxed verification to the AOGCC Commission Office al:: Fax NO. 276-7542 Inspector North Slope Pager No. 659-3607 or 3687 If your call is not returned by the inspector within 12 hours please contact the P. I. Supervisor at 279-1433 REMARKS: Distribution: Grig-Well File c- Oper./Rig c- Database c - Trip Rpt File c- Inspector STATE WITNESS REQUIRED? YES X NO 24 HOUR NOTICE GIVEN YES X NO Waived By: Witnessed By: Larry Wade FI-021L (Rev.12/94) Aeoggzfe.xls GeoQuest 500 W. International Airport Road Anchorage, AK 99518-1199 ATTN: Sherrie NO. 11370 Company: Field: Alaska Oil & Gas Cons Comm Attn: Lori Taylor 3001 Porcupine Drive Anchorage, AK 99501 Prudhoe Bay (Cased Hole) 7/27/98 Well Job # Log Description Date BL RF Sepia LIS Tape G-31A "/~L ~~ 98366 MCNL 980503 I 1 1 J-13 '/~ ~)~-7~] 98371 CNTD 980408 1 I 1 R-29A ~C 3 ~ ~-~ 98292 RST-SIGMA 980621 I 1 1 A-43 ;j~ ~ ~'~'~ 98368 RST-BORAX 980423 1 I I -- -- -- -- -- -- -- PLEASE ACKNOWLEDGE RECEIPT BY SIGNING AND RETURNING ONE COPY EACH TO: BP Exploration (Alaska) Inc. Petrotectnical Data Center MB3-3 900 E. Benson Blvd. Anchorage, Alaska 99519-6612 Date Delivered: Schlumberger GeoQuest 500 W. International Airport Road Anchorage, Alaska 99618-1199 r' TONY KNOWLE$, GOVEBNOFt ALASKA OIL AND GAS CONSERVATION COMMISSION 3001 PORCUPINE DRIVE ANCHORAGE, ALASKA 99501-3192 PHONE: (907) 279-1433 FAX: (907) 276-7542 June 23, 1998 Mr. Dan Stone Engineering Supervisor ARCO Alaska, Inc. P O Box 196612 Anchorage, AK 99519-6612 Re; Pmdhoc Bay Unit 02-07A ARCO Alaska, Inc. Permit No.: 98-107 Sur. Loc. 3709'NSL. 4243'WEL. Sec. 36. T1 IN. RI4E. UM Btmnholc Loc. 1451'NSL. 4974'WEL. Sec. 36. T1 IN. RI4E. UM Dcar Mr. Stone: Enclosed is the approved application for pcrmit to rcdrill thc above rcfcrcnced well. Thc pcrmit to redrill docs not exempt you from obtaining additional pcrmits required bv law from other governmental agencies, and does not authorize conducting drilling operations until all other required permitting determinations are made. Blowout prevention equipment (BOPE) must be tested in accordance with 20 AAC 25 035. Sufficicnt notice (approximatcly 24 hours) must be given to allow a rcprcscntative of the Commission to witness a tcst of BOPE installed prior to drilling new hole. Notice may be given by contacting thc Commission pctrolcum field inspector on the North Slope pager at 659-3607. Robert N. Christcnson Commissioncr BY ORDER OF THE COMMISSION dlffEnclosurcs cc: Dcpartmcnt of Fish & Game. Habitat Section w/o cncl. Dcpartmcnt of Environmcntal Conservation w/o cncl. STATE OF ALASKA ALASKA ~J~'L AND GAS CONSERVATION COM.~,ISSION PERMIT TO DRILL 20 AAC 25.005 la. Type of work [] Drill [] Redrill Ilb. Type of well [] Exploratory [] Stratigraphic Test [] Development Oil [] Re-Entry [] DeepenI •Service [] Development Gas •Single Zone [] Multiple Zone 2. Name of Operator 5. Datum Elevation (DF or KB) 10. Field and Pool ARCO Alaska Inc. Plan KBE = 59.40' Prudhoe Bay Field / Prudhoe !3. Address 6. Property Designation Bay Pool P.O. Box 196612, Anchorage, Alaska 99519-6612 ADL 028308 4. Location of well at surface 7. Unit or Property Name 11. Type Bond (See 20 AAC 25.025) 3709' NSL, 4243' WEL, SEC. 36, T11N, R14E, UM Prudhoe Bay Unit At top of productive interval 8. Well Number Number U-630610 1608' NSL, 1315' WEL, SEC. 35, T11N, R14E, UM 02-07A At total depth 9. Approximate spud date Amount $200,000.00 1451' NSL, 4974' WEL, SEC. 36, T11N, R14E, UM 06/23/98 12. Distance to nearest property line113. Distance to nearest well 14. Number of acres in property 15. Proposed depth (MD and TVD) ADL 028311, 1451'I No Close Approach 2560 12581' MD / 9039' TVD 16. To be completed for deviated wells 17. Anticipated pressure {see 20 AAC 25.035 (e) (2)} Kick Off Depth 7450' Maximum Hole Angle 90° Maximum surface 3398 psig, At total depth ('rVD) 8800' / 3432 psig 18. Casing Program Specifications Setting Depth Size Top Bottom Quantity of Cement Hole Casing Weight Grade Coupling Length MD TVD MD TVD (include stage data) 8-1/2" 7" 26# L-80 BTC-M 4598' 5345' 5037' 9943' 8434' 284 sx Class 'G' 6" 4-1/2" 12.6# L-80 IBT-M 2781' 9800' 8297' 12581' 9039' 333 sx Class 'G' 19. To be completed for Redrill, Re-entry, and Deepen Operations. Present well condition summary Total depth: measured 9970 feet Plugs (measured) ,JLJ ...... true vertical 9162 feet Effective depth: measured 9940 feet Junk (measured) Al~$k& true vertical 9138 feet Anch0ra~.8 Casing Length Size Cemented MD TVD Structural Conductor 80' 20" 500 sx Permafrost 100' 100' Surface 2709' 13-3/8" 5900 sx Permafrost II, 430 sx PF II 2736' 2736' Intermediate Production 8694' 9-5/8" 1700 sx Class 'G', 125 sx PF II 8720' 8074' Liner 1516' 7" 425 sx Class 'G' 8453' - 9969' 7823' - 9161' Perforation depth: measured 9711'-9715',9806'-9820'ORIGINAL true vertical 8951' - 8955', 9028' - 9040' 20. Attachments [] Filing Fee [] Property Plat [] BOP Sketch [] Diverter Sketch [] Drilling Program [] Drilling Fluid Program []Time vs Depth PIct [] Refraction Analysis [] Seabed Report [] 20 AAC 25.050 Requirements Contact Engineer Name/Number: C. Michael Jackson, 564-5480 Prepared By Name/Number: Terrie Hubble, 564-4628 21. I hereby certify that the foregoing is t,~ue and correct to the best of my knowledge Signed ~-~ ~o. ~,~L--'~~ DanStone Title Engineering Supervisor Date Commission Use Only ~"'//d:::~ 7 50-029-20154-01 ~.~ ...-~,~...~,t~ for other requirements Conditions of Approval: Samples Required []Yes ~[~No Mud Log Required []Yes .~No Hydrogen Sulfide Measures ,~Yes []No Directional Survey Required ,]~Yes []No Required Working Pressure for BOPE []2M; []3M; C~5M; [] 10M; [] 15M Other: by order of ORIGINAL SIGNED BY Approved By Commissioner the commission Form 10-401 Rev. 12-01-85 Submit In Triplicate Name: I PBU DS 2-07AI Redrill Plan Summary I Type of Redrill (producer or injector): J Producer ISurface Location: Target Location: Bottom Hole Location S36 T11N R14E, 3709 FSL 4244 FEL S35 T11N R14E, 1608 FSL 1315 FEL · S36 T11N R14E, 1451 FSL4974 FEL I AFENumber: 14J0380 I I Estimated Start Date: 1 6/23/98 I IUD= 112,581' I ITVD= I Rig: I Nabors22E ! Operating days to complete: 125 19039' I KBE: 1 59.40'I I Well Desitin (conventional, slimhole, etc.): I Horizontal Sidetrack I Obiactive: I Development production targeting Zone 1(Romeo) sands. Mud Program: Sidetrack Mu~! Properties: LSND J8 1/2" hole section Density (ppg) Funnel Vis Yield Point 10 sec gel 10 min gel pH Fluid Loss 10.0 -10.5 40-55 5-17 5-10 15-25 8.5-9.5 6-10cc Production Mud Properties: Quickdril-n 16" hole section Density (ppg) Funnel vis LSRV LSR YP pH 8.6 - 8.8 45-65 >45,000 cP 10-20 8.5-9.0 Directional: KOP: J7450' MD Maximum Hole Angle: Close Approach Well: 90 From to TD. 10,832' 12,581' NONE Logging Program: Intermediate Production Hole(Build) Production Hole(Horizontal) None Drilling: GR / Dir Open Hole: Platform Express + Sonic Drilling: GR / Dir / 4 Phase Resistivity DS 2-07A Permit to Drill I Formation Markers: Formation Tops MD TVD Kickoff Point 7450' 6894' Whipstock window milled in 9-5/8" casing. Put River 9773' 8254' TSag 9943' 8434' 7" Intermediate casing point. Set casing ±5' in TSad 10,177' 8666' Zone 3 10,252' 8738' Zone 2 10,331' 8810' Target 10,833' 9049' Horizontal target Zone 1 HOT 10,800' 9048' Casin¢i/Tubinq Proqram: Hole Csg/ Wt/Ft Grade Conn Length Top Btm Size Tbg O.D. MD/TVD MD/TVD 8.5" 7" 26# L-80 BTC-M 4598' 5345'/5037' 9943'/8434' 6" 4 1/2" 12.6# L-80 IBT-M 2781' 9800'/8297' 12,581'/9039' Tubing 4 1/2" 12.6# L-80 IBT-M 9800' 0/0 9800'/8297' Cement Calculations: Liner Size: 17" I Basis: Lead - Based on 1493' of open hole with 100% excess and 150' of 9-5/8" x 7" liner lap. Tail - Based on 80' shoe track volume and 1000' of open hole with 30% excess. Total Cement Volume: Lead 71 bbl / 398 ft3 / 123 sk of Premium at 11.0 ppg and 3.24 cf/sk. Tail 33 bbl/185 ft3 / 161 sk of Premium at 15.8 ppg and 1.15 cf/sk. Liner Size 14 1/2" I Basis: I Tail - Based on 80' shoe track volume, 2638' of open hole with 50% excess, I 4.5" 150' of 7" X liner lap and 200' of 7"x 3.5" drill pipe annular volume. Total Cement Volume: Tail 70 bbl/393 ft3 / 333 sk of acid resistant Premium at 15.6 ppg and 1.18 cf/sk. Well Control: Well control equipment consisting of 5000 psi working pressure pipe rams(2), blind/shear rams, and annular preventer will be installed and is capable of handling maximum potential surface pressures. Diverter, BOPE and drilling fluid system schematics on file with the AOGCC. DS 2-07A Permit to Drill 2 Maximum anticipated BHP: Maximum surface pressure: Planned completion fluid: 4218 psi @ 8195' TVDss(9.9 ppg EMW) 3432 psi @ 8800' TVDss(7.5 ppg EMW) 3398 psi @ 8195' TVDss - Put River 2520 psi @ 8800' TVDss - Zone 2B 8.5 ppg Seawater / diesel freeze protection Drilling Hazards/Continqencies DRILLING CLOSE APPROACH: · There are down hole close approach wells. H2S: · Drill Site 2 is not considered to be an H2S Drill Site. All H2S levels at DS 2 are less than 10 ppm. Crew H2S drills will be performed routinely along with the other require drills. INTERMEDIATE SECTION: · The well will sidetrack in the K shales; most of the Kingak is truncated by the LCU. The previous well DS 2-36 did not have any hole problems attributed to this section. · The Put River sand is hydrocarbon bearing with original reservoir pressure and possible high pressure shale stringers exist above the Put River. The estimate pore pressure in the Put River is 4218 psi or an EMW of 9.9 ppg. Drilling will be with sufficient mud weight to adequately suppress the pore pressure between casing points. · The kick tolerance for the 9-5/8" window would be an infinite influx assuming an influx at the TSag 7" casing point. This is a worst case scenario based on a 9.9 ppg pore pressure and a minimum fracture gradient of 12.0 ppg with a 10.0 ppg mud weight. PRODUCTION SECTION: · Loss circulation can be a problem on Drill Site 2. If losses do occur the lost circulation decision tree for non-productive zones will be followed until entering -- the target polygon and the productive zone decision tree thereafter. · The kick tolerance for the 7" shoe would be an infinite influx assuming an influx at the 12,581' TD. This is a worst case scenario based on a 8.6 ppg pore pressure and a minimum fracture gradient of 10.4 ppg with a 8.6 ppg mud weight. DS 2-07A Permit to Drill 3 Disposal No annular injection in this well. Cuttings Handling: Cuttings should be hauled to the ball mill at CC-2A. Fluid Handling: Haul all drilling and completion fluids and other Class II wastes to CC-2A for injection. Haul all Class I wastes to Pad 3 for disposal. In addition, haul all cuttings from drilling operations to CC-2A for disposal, except any metal cuttings which will be sent to the North Slope Borough. SUMMARY SIDETRACK PROCEDURES Pre-Riq Work · Unable to test the 9-5/8" x 4-1/2" / 3-1/2" until after the P&A due to a suspected tubing leak above the 9-5/8" production packer at 8188'. 1. Pull the 4 1/2" SSSV. Valve is set at 2213' MD. 2. Perforate the tubing at 9450' with 8' of shots at 4 spf each and 9727'(between the bottom blast joint at 9721' and the top of the packer at 9733'). Exact shot placement is extremely critical due to shooting the 12' between the blast joint and packer. * It may be more beneficial to cut the tubing at 9727' than perforate after the P&A of the bottom perforations. 3. The objective of the cement plug and abandon is to P&A the bottom perforations, allowing adequate time for the cement to set then P&A the straddled perforations by circulating through the tubing perforations at 9715' and 9450'. Rig up a CTU and P & A the bottom perforations. Stage 1: Pump 13 barrels of cement to fill the 7" liner from the bottom packer at 9733' to PBTD at 9934' plus squeeze away 5 barrels to the perforations. Stage 2: After waiting 4 hours circulate through the tubing perforationS; at 9727' pumping 17 - barrels of cement to fill the 7"x 3-1/2" annulus and 3-1/2" tubing plus squeeze away 5 barrels to the perforations. 4. Rig up slickline and drift the tubing to 2.625" documenting the top of cement. · Top of cement must be at a minimum of 9546' for AOGCC compliance, plan to leave TOC @ 9400' unless a squeeze is not possible then leave TOC @ 8200' at the highest. 5. Pressure test the cement plug and casing to 3000 psi for 30 min. · If the pressure test fails notify the Nabors 22E Drilling Engineer at 564-5486. 6. Cut the 4 1/2" L-80 tubing with a chemical cutter in the middle of the full joint of tubing below the bottom GLM(bottom GLM @ 8008'; estimated cut depth @ 8028'). 7. If not done previously, circulate the well with 8.5 seawater ensuring there is no trapped gas and the well is dead. 8. Freeze protect top 2200' MD with diesel. 9. Bleed tubing and annuli pressures to zero. DS 2-07A Permit to Drill 4 10. Test the 9-5/8" mandrel packoff to 5000 psi for 30 minutes. 11. Set BPV in the tubing hanger and test from below to 1000 psi. Secure well. 10. 11. 12. 13. 14. 15. 16. 17. 18. 19. 20. Riq Operations 1. MIRU Nabors 22E. · Notify the North Slope AOGCC representative 24 hours prior to testing BOPE. 2. Circulate out freeze protection. Set TWC. 3. Nipple down tree. Nipple up and test BOPE. 4. Pull 7" x 4-1/2" x 3-1/2" tubing. 5. Set cement retainer at ___7465' and test to 3000 psi for 30 minutes. 6. RIH with 7" Baker whipstock assembly and set whipstock on cement retainer. Displace well with drilling fluid while milling the window. 7. Kick-off drilling the 8-1/2" intermediate section to TSag @ _+9943 md. 8. Run and fully cement a 7", 26# intermediate liner with a minimum of 150' liner lap in the 9-5/8". 9. Test the 7" and the 9-5/8" casing from the 7" landing collar to surface to 3000 psi for 30 minutes. Drill the 6" production section building to horizontal targeting the Zone 1 (Romeo) sands to an estimated depth of 10,832'. Run DPC logs from horizontal to 7" shoe. Drill the 6" production section horizontally with GR/Dir/4 Phase Res. To an estimate TD at 12,581' Run and fully cement a 4-1/2", 12.6# production liner with a minimum of 150' liner lap in the 7". Test the 4-1/2", 7" and 9-5/8" casing from the 4-1/2" landing collar to surface to 3000 psi for 30 minutes. The 4-1/2" production liner will be perforated with DPC 2.75" guns on a 200 psi under balance. Perforating details to be determined after reviewing logs. Run 4-1/2" completion tying into the 4-1/2" liner. Test the tubing to 3500 psi and annulus to 3000 psi for 30 minutes. Nipple down the BOPE. Nipple up and test the tree to 5000. psi. Freeze protect the well to -2200' and secure the well. Rig down and move off. Estimated Start Date: June 23, 1997 C. Michael Jackson 564-5486 5/28/98 DS 2-07A Permit to Drill 5 Wel~ ......... : DS 02-07A (P10) Fie~d ........ : Prudkoe Bay Computation..: Minimum CurvaCure U~iC$ ........ : FEET Surface Lat..: 90.26?22?78 N Surface ~ong.: 148.48129442 W A_~adri[~ Schlumberger Alaska District 1111 East 8Q~h Avenue Anchorage, AK 99518 (907) 3~9-4511 F~x 344-2[60 DIR_BCTIOM~L WELL PLA~ for SKAR~D SERVICES DRILLING L~gal Description Tie-in survey: 195~ FSL 5~4~ FEL S36 TllN Rk4E UM Target/ESL,,.: ~608 FSL 131~ F~5 $$5 T~iN R~4E UM In~ Tc3t ~ .... : 1799 FSL 456 ~ S$5 TllN R14E UM BHL .......... : 1451 FSL 4974 FEL S36 T11N R~4E IfM LOCATIONS - ALkSKA Zone: 4 X-Coord Y-Coord 687803.19 5949635.65 6868~9.88 ~947535,10 66~506.00 $94~477,00 6~6360.00 5949689,01 68713L.00 5947560.00 ANADRII..L AI<A-DPC FEAS! il...,!TY PLAN NOT A ROXrED ,, E'>(ECUTION Pi,AN ........................... ~.- ,~ ..... ..:.j.. ~ .............. Prepared ..... : 15 May 1998 Vert sect az.: 90.~5 KB elevation.: 59.40 f~ blag~etic Dcln: %28.241 (El Scale Factor.: G, 9999!~007 Co~ve~ge-~ce,.: +1.42~66176 PROPOSED WELL PROFILE STATION M~AEUREO INCLN DIRECTION VErTICAL-DEPTHS SECTION I O EtTTI FICATION DEPTH A/4GLE AZ I MUTH TVD SUB - SEA DEPART TIE-~ SURVEY 7401,40 25.02 2~0.97. 6~55.27 6795.~7 -g87,07 TOP OF ~INDON 7~A5.00 24.87 220.67 6594.80 6835.40 -999.00 KDP/CURVE 6,00/L00 7i50.D0 24.85 ~0.63 6899,33 6839.93 -1000.36 ~00.00 26.82 225.83 6944,34 6~64.94 7600.00 ~[.22 234.28 $031,80 6972.40 7700.00 ~6.0% 240.75 7800.00 ' 41,13 245.84 7900.0Q 46.41 249,97 8000.00 51.~1 2~3,43 8100.O0 57,30 ~$6.4~ B20Q,O0 62.85 259.04 COORDINATES-FROM WELLHEAD 1776.31 S 997.9] 1790.23 S [010.01 [807,66 S I026.32 I838,$4 S 1065.57 7115.07 7055.67 -~098.83 ~868.07 S 11~0.32 7193.23 7133.83 -i~5~.38 1895.93 S 1166.04 7265.~3 7206.03 -Z218.3~ 192L.82 S 1230,14 7330.08 7271,48 -k289.93 1945.~5 ~ 130L.$9 7388.86 7329.46 -1368,43 1966.56 S 1380.53 7438,73 7379,33 -1~52.97 [984,92 S ~465.18 Zone 4 T~L DL/ Y FACE 100 6B663B.21 5947~20.B9 13~..~ 6B6~6.B9 55476L9.26 (51R 686~22,35 59478fl3.06 47~ 6.00 6B6~B~ ,~ 5947~ .26 3~ 6.00 686739.88 594~7{0.57 3{R 6.00 656684.88 59~$711,33 t0R 6.00 686621.45 59~7683.86 27R 6,00 686550.31 59~765~.45 25R 6,00 686472.23 5947635.38 23R 6,00 686388,07 $9476[4 . 92 22R 6.00 I> (Anadrill [c)98 0207APlO 3.2b.5 ~:~3 AM P) ho DS 02-07A (PI0) PROPOSBD W[~LL PROFILE STATION I DElfT I FLOAT I ON El~93 5 · 00~ 10Q CURV~ CURVg 8,0~/100 MEASURED 8206.0l 9288,34 9300.00 9400.00 9500.00 I~CLN ANGLE 63,t9 63.19 62.25 54.26 46.28 DIRECTION AZIMUTH 259.I9 259-19 259.24 259.68 260.23 VERTICAL-DEPTHS SECTION TVD SUB - $~A DE PART · 7441.46 7382.06 -1458.23 7929.68 7870.28 -2465.91 7935.92 7875.62 -2416.08 7987.59 7928.I9 -~499.52 8851.46 7992.06 9600.00 ~700.00 9782.82 9800.00 9900.00 38.29 -%0.31 25.73 22,34 260.95 8125.38 8065.98 -2641,34 ~61.98 8209.92 8148,52 -2696.97 263.30 8281.40 8222,00 -~73~,09 263.66 8297,48 8238,05 -~740.88 267.09 8392,3~ 833~.9Z -2~72.24 TOP 8AGR END 8.007100 CURVE PROPOSED 7" CSG PT CURVE 12,fl0/100 9943,16 9953,33 9953.3~ 9999.67 10000.00 11.02 10 10.2~ 10.2~ 10.19 170.00 8434.40 8375.00 -2781.73 290.97 8444,40 8385.00 -2783.60 270.97 8444.40 8385.00 -2783.60 2~0.97 8490.00 8430.60 -279Z.83 2~1.03 8490.3~ 8430.95 -279Z.89 CURVE 12.~0/ZO0 TSAD TE3 10082.51 10100.00 10179.26 10200.00 10252,26 2.41 3.3.9 11.62 14.30 20 $47,¢8 8572.~6 8512.96 -2999.59 28,55 8589.82 85~0.42 -2999.44 65,67 8666.40 8607.00 -2991.34 67.98 8688.56 8629.16 -2986.66 71,02 8738,40 8679,00 -2972,04 TZ2 10300.O0 iD400.O0 lOSO0.O0 10600.00 26.20 30,02 38,16 50,14 62,13 72.58 8782,22 8722,82 -2754.t0 73.31 8510,40 8751,00 -2739.93 74.4~ 8866,70 8807.30 -2703.Z8 75.47 8958,32 8878,92 -2636.14 76.~3 8993.95 8934.55 -2555.89 LOW POINT 1070(>.00 10800.00 3.0832.51 74,11 90.00 76.80 79. ~2 , 15 May 1998 Page 2 (Anadrill (c) 98 02074P1~ 3.2b,5 8:43 AM P) mnmm COORDINATES-~ROM ALASKA Zone 4, TOOL DL/ WELLSEAD X Y FACE 1985.93 S 1470.44 W 686382.~3 59476L3.77 HS 6.DO 2167.12 S 2419.26 ~ 685436.89 5947q08.98 19?R 0.00 2169,06 S 2429.44 ~ 685428.77 5949406.79 177R 8.00 2184,62 9 2512.97 ~ 685345.65 5947389,15 177R B.00 2298,04 S 2588,64 W 685290.35 5947373.85 177~ 8.00 2209.06 S 2654,95 W 685204,33 5947361.18 176R 8,00 2217.46 S 2710.63 W 685148,89 59~735L.39 175R 8.00 2222.~1 S 2747.78 W 685111.87 5947345.62 174R 8.00 222~.09 S 2754.$8 W 68~105,09 5947344.67 L74R 8.00 2225.82 S 2785.95 W 685073.~0 5947341.~5 171R 8.00 2226.10 S 2995.44 ~ 685064.~2 5949340.64 16BR 8.00 2226.08 S 2999.~2 ~ 685062.4~ 5949~40.61 ~S 8.00 2226.08 S 2999.32 ~ 6850~2.44 S947~40,61 ~B B.OO 2225.94 $ ~805.54 W 685054.22 5947~40.$5 166~ 0.00 2225,94 S 2805.60 W 68~054.16 S94734Q,55 ~66R 12.00 2224.1[ 8 2813,29 W 685046.42 5947342,~8 2223.33 9 2813,14 W 665046.56 59~7342.97 2218.22 9 2805.0i W 655054,56 5947348.28 2216.22 S 2800.3~ W 685059.20 59473~0.39 2210.82 S 2785.66 W 685073,71 5947356.16 2204.94 S 2767.68 W 685091.54 59(7362.49 2200.53 S 2753.29 W 685105.~2 5947367.25 2189.97 S 2716.68 W 685142.~6 5947378.72 2~9L.98 S 2649.52 W 685205.84 5947398.39 2Z51.74 S 2569.I5 ~ 685268.68 5947420,62 29R 12,00 68R 12.00 12R 12.00 10R 12.00 7R 12.00 9031,15 8971.75 -2465.95 2130.13 S 2499.07 9048.30 8988.90 -2370-25 2Z08,12 S 2383.24 9049.40 8990.00 =2338.59 2101,03 S 2351.53 5R 12. O0 5R 12. O0 4R 12. O0 3R /2.00 3R 12. O0 685378.18 594744~,46 685473.¢3 5949468,86 685504.95 59474?6,74 3R 12.0(> 2R 12.00 2R 12. O0 DS 02-07A [PLO) 15 May X998 Page 3 STATION MEASURED IDENTIFICATION DEPT~ END [2.00/[00 CURVE 10835,60 CURVE 12,00/100 [1713,$a TGT [HTERKED]ATE [1713,58 11800,00 END :2.00/100 CURVE NCLN At~GL~ 90 . 13 90 90.1~ 90.13 90.26 TD ~1900.00 90,40 1~000.00 90.52 12100.00 90.62 1~112,~ 90.63 12581.8~ 90,~3 1258~.84 90.63 PROPOSED WELL PROFILE DIRECTIO~ V~RTICAL-DEFTHS AZIMUT~ TVD SUB - SEA 77.49 9049,~0 8990.00 77.~9 9049,40 8990.00 97.49 90~7.40 8958.00 77.%9 9047.40 8968.00 87.86 9047.~0 $987.70 SECTION DEPART -2332,53 -2337.53 -1479.64 -147~.64 -1394.11 CCORDINATES-FROM WELLHEAD 2100.80 S 2350.47 2100.80 S 2350.¢7 19[0.16 S L49~.39 1910.16 S 1699.15 S 99,86 90~6.53 8987.13 -1294.~8 1905,86 111.~6 9045.72 8986,32 -1198.30 1933,14 123.86 9044.72 8985,32 -1109.77 1979.7S 125.34 9044.58 8985,18 -~099,59 1986.77 125.3~ 9039.~0 8980,00 -714,92 2258.31 125.5~ 9039,40 8980.00 -~14,92 mm= ALASKA Zone ~ Y 685506.00 S947477.00 685506.00 5942477,00 686360.00 5947689.00 149~.39 W 686360.00 594?689.00 1~05,79 W 686445.29 594~702.14 :=~ mmmm TO05 DL/ FACE KS 12.00 HS ~.00 89R 0.00 69R 0.00 89R 12,00 1306.21 W 6S6545,0l 5947697.91 B9R 12,00 1210.19 W 686641.67 5947675.04 89R %2.00 1121.94 ~ 686731.05 5947628,62 90R 12.00 1%11.81 ~ 686741.36 5947622,89 ~ 12.00 ?25.80 ~ 6~13[.00 5947360,00 0.00 2255.31 S 728.80 N 687131.00 5947360.00 0.00 , '.,"'.,.,~ LL AKA,_D,f~C · -'.,el .P..!t._!, Y PLAN NOT APPR:OVED FOR PLAN ..... . -0 (A~adrill (c)98 0207A810 3,2b.5 B:43 AM E) 05/15/1998 14'31 907-3q '160 ANADRILL DPC PAGE 05 · SHARED SERVICES ORILLING I I , · - "' ' 1~ . ill ii iiii DS 02-07A (PLO) VERTICAL SECTION VIEW 600 .... Section ar_: 90.35 TVO Scale ' '1 inch = 1200 feet. 12oo-- Oep Scale.' ~ inch = ]200 feet ~Drawn · i5 May ~998 ]800-- ~ , I Anadri l] Schlumberger Marker Identification Mr} 8K8 SECTN INCLN 2400 ...... Al TIE-IN SURVEY 740~ 6855 -987 25.02 8) TOP OF WINDOW 7445 6895 -gg9. 24,87 C) KOP/CURVE 6,00/100 7~50 6899 -~000 ~4.85 3000 ....... D) END 6.00/100 CURVE 8206 744! -1458 63.t9 E) CURVE 8.00/100 9288 2930 -2406 63.19 I F) END 8,00/:!00 CURVE 9953 8444 ~2784 J0,23 ;T , 6) PROPOSEO 7" CSG PT 9953 8444 -2784 10.23 V 3600 I '" H) CURVE ~2.00/~00 tO000 8490 -2792 10.23 ' I) CURVE ~2.00/100 10083 B§72 -2800 2,41 0 J) LOW POINT ~0833 9049 -2339 90.00 .... K) END 12,00/i00 CURVE 1083~ 90~9 ~2338 90,13 4200 ~-' LJ TGT BSL i0834 9049 -2338 90.13 M) CURVE t2,00/t00 11714 9047 -1480 90. N) TGT INTERNEOIATE 11714 9047 -J480 90.13 4800 ...... O] END t2.00/JO0 CURVE J21J2 9045 -J~OO 90.63 P) 4-~/2" LINER PT ~2582 9039 -7~5 90.63 O] TO 12582 9039 -715 90.63 5400 ..... 6000 / " 6600 ...... ~ ............. ........... ~ .... ~.,._ ........ ~,~.. ........ --~'1 ~ .% - . ~ '-% , ~ ,/ ..~. -. ~ J A ~ ,..~..~ L£ Al,, 7200 ~ '-~:-': '''''"''' ''' :']; ; ~-~/ I~ ~'" NOT ,/""-., / 7800 ~ -. E- /-'. L '-, ,., -... , ,iv '__ Fl ...... ~ E~ ' ~ ........................ ~ ......... , 9000-~ ~ .................. ;.':"~'~'"- S ', t) j -~(" ~ 0 ~' P ,, , 9600 .... , . - ~0200 '-- 10800 ~3~00 -3000 -2400 -1800 -~aoo -600 0 600 ~200 taoo 2400 3000 3600 4200 4800 Section Departure ,. ..~ ~]5/15/1998 14' 31 987-3d 2168 ANADRILL DPC PAGE 86 SHARED SERVICES DRILLING Il ,ml llJllll I II DS 02-07A (PLO) VERTICAL SECTION VIEW Sec~en al:: 90.35 TVD Sca]e · ~ inch ~ 400 feet 6600~-- Oep Scale ' J inch = 400 feet Drawn ' ;15 May ~998 / 6800 ......... tlnadrY,, ]] $ -¢ umBemg£r , 7000-- - , ..... M~rkep Identification MC BKB SECTN INCLN A) TIE-IN SURVEY 74~ 6855 -987 25.02 B] TOP OF WINDOW 7/~ 6895 -B99 24.87 c) K~/CURVE 6.00/~00 /~0 6899 -JO00 24.85 7200-- ,, -- D) END 6.00/t00 CURVE / 8~06 744~ -J458 E) CURVE 8.00/~00 / ~88 7930 -2406 63. F) END 8.00/~00 gU~ ~953 8444 -278~ ~0.~3 Gl PROPO~ ~ ~ PT /9953 8444 -2784 10,23 7400-- H) C~VE ~t00 ~O000 8490 -2792 10.23 ! I) cuR~.O0/~O0 /10083 857~ -2800 2.4t J~POINT . / 10833 9049 -2339 90.00 T 7600-- , ~ ~ END 12.00/]00 CURVE / J0834 9049 -2338 90.13 L) fGf BSL J J0834 g04g -2338 go. V M) CURVE ~2.00/)00 / 1~714 goJ7 -t~80 N) TGT IN~RMEOIATE / 11714 9047 -1480 90.13 D 7BOO , ~ O) E~ 1~0/100 CU~V~ 12~i2 9045 -1~00 90.63 ' ~ P) 4-~2' LINER PT / i2582 g03g -715 90.63 O) fO / 12582 9039 -715 90.63 / 8000 .... 8200 ..... . - / ~[c~- ~1- 8400- . ....... H' 8600 I - ' . ......... ...... J ........ ~r ~' . ..... 88o0 ...... -L ...... ~-- ' ~ =7 ~ / 9000 ......~~/ ,.. d / M 0 P , , 9200 - ' i- 7- ' p.~> :, ~ [ ,"~ . . ~. 9400 ' -- i ,[ .," ~'[]-/;J~.;' ,-, I i .: ;,..-~ ,~.. i .... . ....... 9800 ...... -3200 -3000 -2800 -2600 -2400 -2200 -2000 -JeO0 -~600 -~400 -~200 -iO00 -800 Section BepaptuPe ,, ~ ~ ~ , O~edrill (cl~ 0207APlO 3,2b.5 8.5t 05/15/1998 14'31 907-34~ 160 ANADRILL DPC PAGE 07 SHARED SERV ICES DR ILL l NG I lin mi ii lllllll I I I ' I OI ENO 6.00/100 CURVE 8~06 ~986 El CURVE 8.00/100 9288 2167 S 2419 ~ CLOSURE - 2373 fee( at Azimu[h ~97.89 FI ENO 8.00/100 CURVE 9953 2226 S 2797 61 PROPOSED 7' CSB Pf 9953 2~26 S 27g7 ~ DECLINATION.' +28.241 (E~ HI CURVE 12.00/~00 lO000 2226 S 2806 ~ SCALE · ~ ~nch = 600 fee[ I) CURVE 1~.00/100 J) LOH POZNT J0833 210~ S 2352 ~ DRANN. ' J5 May ~998 K) ENO ~2.0o/1oo CURVE L) TCT BSL- ]0834 - 210~ S 2350 H) CURVE ~2,00/~00 J~7~4 lgJO S 14g~ ~ - N) TGT INTERMEDIATE ~1714 t9~0 8} END ~2.00/t00 CURVE ~21~2 t987 S ~2 W ..... P) 4-1/2' LINER Pf t2582 2258 S 729 W O) ~D I~[:2~.~S ~"~ x --300 KB ................ -- ...... 0 / ....... ---300 / ~ ; '.~,~' ~ . '~" .--"'S"~ }t$' ~ 'qSp. f ..... " ~ ' t"*¢ ~ ~; ¢~-'¢ ~ ' --600 ~ : ,1 " L,./ 3,.[:~ ;, ,,, ~- ---900 ........................... .. ...... -- --- t200  -- 1500 I ....... ~ ~~~~' r~ ~~/ ~. " --~oo- - ~oo ~ , 8~00 .... ....... - -3300 ....... I } .... } .. 3go0 3~00 3~00 3300 3000 ~700 ~400 RiO0 iBO0 ~500 l~O0 go0 600 300 0 300 <- NEST ' EAST -> , , .. ~ .,., 85/15/1998 14'31 907-34~ '60 ANADRILL DPC PAGE 88 SHARED SERVICES DRILLING DS 0 2-0 7A 10 PLAN VIEW D] END 6.00/~00 CURVE 8206 1986 S 1470 W CLOSURE · 2372 feet at AzJmuth ~97.89 El CURVE 8.00/tO0 9288 2~67 S 24J9 w F) ENO 8.00/~00 CURVE 9953 8226 S 2797 w DECLINATION.' +28.24~ (E) SCALE ' 1 inch = ~00 feet H) CURVE ~2.00/]00 ~0000 2226 s I) C~VE J~.O0/]O0 ~0083 2224 S 28~3 W DRAWN ' ]5 May 1998 K) L) fGT 8SL J0834 '-" M) CURVE ~2.00/~00 ~]7~4 .qrh / hm npm N) TGT INTERMEDIATE ]~7]4 ]9~0 S ~491 W P} 4-J/2' LINER PT J2582 2258 S 729 W JO00 1~00 ' '1 " · moo ooo _ .... ~ ~ , ,~._. ~°°-- 2600 ....... ~ooo [~~ .... 500~ ....... .................. ~..... ...... 3200 r '~_~: i L.; .... ~' '-~,--. ~ ':~ 3400 ........ ~~"';::~ ..... ~,,~ ~ooo ~..... :':: .... - .... "-"-;---':::':'""-i:/~ - ..... 3800 ...... 3000 2800 2600 2400 2200 2000 ~800 1600 1400 t~O0 lO00 800 600 400 200 <- WEST , mm ,, 4nadrjll (c]~3 0207APJO 3.2b.§ 8:§3 ~ PI Well : 02 -07 Spud Date: Ol--13-75 Original RKBE:58' ToD of Formation: 9233' Annular Fluid :Diesei / 8 . 5 SW ARCO Ai~ka, Inc. - Prudhoo Bay AP1 =:50-029-20154-00 Completion 09-21-90 HangerType:FMC Gen I Max Hole Angle:39° @ MD:9940' Type: PRODUCER Status :Workover Hanger:29' Angle @ T.~:22 Angle @ TD:40' ReferenceLog:BHCS Date:03-20-75 Tie In: Date: 00-00-00 Ann. Comm: LDL 09/07/96 Indicates Leak @ 9663' ALL DEPTHS ARE RKB DRILLING MD TO TOP OF EQUIPMENT EXCEPT WHERE NOTED. J-1 J-2 · C-1 J-3 G-1 Jewelry (J) Depth Description 78' Crossover 5-1/2' x 4-1/2' 2213' 4-1/2' Otis HRQ SSSVNipple ID=3.813' (Wireline Retrievable) 3018' Crossover 4-1/2' x 3-1/2' 8188' 9-5/8' x 3-1/2' Baker DB Packer 8214' 3-1/2' Otis X Nipple ID=2.813' 9645'' 3-1/2' Blast Joints (9645'-9695', 9705'-9721') I-1 J -4 M-1 Min ID: 3-1/2" Otis X Nipple ID=2.813" 7 9733' 8 9745' 9 9752' 10 9753' 11 9754' 9751' 7-5/8' x 3-1/2' Baker FB-1 Packer Jet Cut Tbg (08/31/97) 3-1/2' Otis Xl~ Nipple ID=2.75' w/PXN Plug ID=0.00t' (Set 05/93) 3-1/2' Baker Shearout Sub 3-1/2' Tubing Tail ELM Tubing Tail (Logged 10/14/90) FISH: TTP (Lost 07/20/97) FISH: MC-VR-STD (Lost 10/20/90) J-5 Min ID: 3~1/2" Otis XN Nipple ID=2.75" w/PXN Plug ID=0.001" Casing and Tubing (C) Size Weight Grade Top 1 13-3/8' 72# MN-80 0' 2 9-5/8 ' 47# N-80 0' 3 7 ' 29# MN-80 8453' C-2 5-1/2' 17# L-80 0' 4-1/2' 12.6# L-80 78' P - 1 3-1/2' 9.3# L-80 3018' 3-6 Gas Lift Information (G) Ct~ lb~ MD TVD Stn Mandrel Valve Type @ 9745' 3214' (3211') 1 CA-MPIG MC VR-STD 5436' (5184') 2 CA-MMG MC VRSO J - 7 6705' (6240') 3 CA-MMG CA RD J-8,9 7385' (6849') 4 CA-MMG CA RD 7855' (7280') 5 CA-MMG CA RD 3-10,11 8008' (7422 ' ) 6 CA-MMG CA RKED J-~3 P-2 Chemical Injection Information (I) MD TVD Stn Mandrel Valve Ty~e 8100' (7508 ' ) 7 CA-MMG MC VRCH-2 Production Mandrel Information (M) MD TVD Stn Mandrel Valve Type 8295' (7691 ' ) 8 CA-MMG CA RKFS 8387 ' (7777 ' ) 9 CA-MMG CA RKFS J-14 Bottom Description 2736' Casing 8720' Casing 9969' Liner 78' Tubing 3018' Tubing 9753' Tubing Latch Port RK 5/16' RK 3/8" RKP TRO Date 1600 ORIF Latch Port TRO Date RK 3/16' 3250 11-02-90 C-3 Latch Port RKP 3/4' RKP 3/4' TRO Date 0RIF 10-20-96 ORIF 10-20-96 Perforation Data (ELM DEPTHS) (P) Interval Zone 9646- 9676 2 9700- 9711 2 9711- 9715 2 9715- 9716 2 9740- 9765 2 9776- 9806 2/lB 9806- 9816 2 9816- 9820 2 FT SPF Date Comments 30 0 08-25-88 SQZ - ARC 11 0 08-25-88 SQZ - ARC 4 2 09-18-90 RPERF 1 0 09-14-90 SQZ - ARC 25 0 09-14-90 SQZ - ARC 30 0 09-14-90 SQZ - ARC 10 4 09-18-90 RPERF 4 4 09-18-90 APERF FRAC 10/14/90 Datum 8700' SS= 9464' MD 8800' SS= 9581' MD PBTD= 9934' TD= 9970' Revision Date: 09-09-97 by ENH Reason: Jet Cut qh/bing Previous Reason: 08-22-97 Well 02-07 TREE: 6 3/8" McEVOY WELLHEAD: McEVOY ACTUATOR: 6" OTIS DS 2-07A Pr 'bposed Completion Nabors 22E KB. Elevation: 59.40' Diesel freeze protection at 2,200' MD 4-1/2" BaI-O SSSV @ +/- 2000' 4-1/2" X 1-1/2" GLM's 4 1/2", 12.6~/ft, L-80, Mod Buttress 9-5~8" x 7" Packer at 7300' 7", 26~, LB0, BTC 9-5/8" Whipstock set for casing exit at 7450' Bridge plug set at 7465'~ Chemical cut at 8028'MD Top of 7" Liner [ 8453' 9 5/S", 47#~ft, N-80, [ e720' ] -- Top of cement minimum 9400' 7" x 4-1/2" Packer at 9725' 7" Liner Top at 9800' TD at 8-1/2" TD at 9943' 12,581' 4 1/2", 12.6~/lt, L-80, ~ I.-80 IBT-Mod 9 5/8" Baker Packer ~ 3 t/2", 12.6~flft, L-80 Tailpipe Perforations: 9646' - 9716' 7' x 3-1/2" Baker FB-t Packer 97[~~ Perforations: 9740' - 9820' PBTD I 9934' 7", 29#/ft, MN-80, J 9969' OATE 5/26/98 REV. BY CMJ COMMENTS Proposed Completion PRUDHOE BAY UNIT WELL: 2-07A APl NO: 50-029-20154-01 SEC 36; TN 11N; R13E Arco Alaska Inc .,_hared rvices rilling AlaSka ~ WELL NAME DS 2-07A DRILLING PERMIT/SUNDRY/PRE-RIG COVER SHEET IThe attached work cannot commence without obtaining the required signatures in I the "APPROVAL TO PROCEED" section at the bottom of this cover sheet. I "APPROVAL TO PROCEED" will signify AOGCC approval has been received. This cover sheet is applicable to: (only one category per cover sheet) DRILLING PERMIT Permit Documentation Prepared: ODE: ~,.~~ ~ Date:__ Permit Applicat~o~n Reviewed: SDE/ES' c~:->~-~,~. ~ Date: '/' ~q~ ~ Pe~i~pplic3[ion Sub~tted: SUNDRY NOTICE D Sundry Documentation Prepared: ODE: Date: ~'] Sundry Application Reviewed: SDE/ES: Date: ---]Sundry Application Submitted: TA: Date: NOTE: IF SUNDRY IS FOR PRE-RIG WORK, USE PRE-RIG WORK SECTION AT BELOW LEFT AND CHECK "ABANDON" BOX BELOW PRE-RIG WORK Pre-Rig Memo Reviewed: S DE/ES: Date: Pre-Rig Memo Sent to Slope: ODE: Date: Pre-Rig Sundry Documentation Prepared: ODE: Date: Pre-Rig Sundry Application Reviewed: SDE/ES: Date: Pre-Rig Sundry Application Submitted: TA: D ate: ~ Reason for Sundry (Check all that al~pl.v) Abandon Alter Casing Suspend Repair Well Plugging Pull Tubing Variance Other(Explain): Change Approved Program Operation Shutdown Re-enter Suspended Well Time Extension Perforate Stimulate APPROVAL TO PROCEED Approved AOGCC Permit/Sundry Received TA: Date: Approval to Commence Operations SDE/ES:__ Date: H 13 6 0 8 4 I °3/27/'~1 I """u'"'-"'='""':'"'" I VENOOR Al ASKAST 14O0 DATE INVOICE / CREDIT MEMO DESCRIPTION GROSS DISCOUNT NET 032498 CKO32498F I00. O0 100. O0 HANDL[NQ INST' S/H TERRI HUBBLE X 4628 THE A'FI'ACHED CHECK IS I. PAYMENT FOR ITEMS DESCRIBED ABOVE. ~[e]~l'-al[] ~ I OO. Clio 100~ OO · WELL PERMIT CHECKLIST COMPANY ,~,2,~,,., .,-.~ WELL NAME .~.~,/¢'/~/ ,~-~ ~:;'/~ PROGRAM: exp [] dev/~ redrll~ serv [] wellbore segt, ann. disposal para reqll ''~'~ "'- "- ' '~J ~'¢,d:::3 UNIT# . ON/OFF SHORE ~ ~ INIT CLASS /_./_~,/,,,, /'~.// GEOL AREA //~",.¢" O FIELD & POOL ADMINISTRATION 1. Permit fee attached ....................... 2. Lease number appropriate ................... 3,. Unique well name and number .................. 4. Well located in a defined pool .................. 5. Well located proper distance from drilling unit boundary .... 6. Well located proper distance from other wells .......... 7. Sufficient acreage available in drilling unit ............ 8. If deviated, is wellbore plat included ............... 9. Operator only affected party ................... 10. Operator has appropriate bond in force ............. 11. Permit can be issued without conservation order ........ 12. Permit can be issued without administrative approval ...... 13. Can permit be approved before 15-day wait ........... ENGINEERING APPI% DATE:_ GEOLOGY ,Y Y N Y N Y N Y N Y N Y N 30. 31. 32. 33. 34. 14. Conductor string provided ................... ~/~ N '~ 15. Surface casing protects all known USDWs ........... N 16. CMT vol adequate to circulate on conductor & surf csg ..... N ¢~'> 17. CMT vol adequate to tie-in long string to surf csg ........ N 18. CMT will cover all known productive horizons .......... (~"'~ N 19. Casing designs adequate for C, T, B & permafrost ....... U N 20. Adequate tankage or reserve pit ................. N 21. If a re-drill, has a 10-403 for abandonment been approved... 22. Adequate wellbore separation proposed ............. 23. If diverter required, does it meet regulations .......... ~ f,¢¢~- 24. Drilling fluid program schematic & equip list adequate ..... g'Ct, t 25. BOPEs, do they meet regulation ................ Itr~ 26. BOPE press rating appropriate; test to ,¢'od:~ psig. .Y N 27. Choke manifold complies w/APl RP-53 (May 84) ........ Y N 28. Work will occur without operation shutdown ........... .Y N 29. Is presence of H2S gas probable ................. N Permit can be issued w/o hydrogen sulfide measures ..... Y~ Data presented on potential overpressure zones ....... / N .//, ~ Seismic analysis of shallow gas zones ............. J Y N/b,", /"7': Seabed condition survey (if off-shore) ...... ...... .//' Y N Con. tact.nam, e/phon.e.for weekly progress reports .... /. Y N lexp~orazory on~yj ANNULAR DISPOSAL 35. With proper cementing records, this plan (A) will contain waste in a suitable receiving zone; ....... Y N (B) will not contaminate freshwater; or cause drilling waste... Y N to surface; (C) will not impair mechanical integrity of the well used for disposal; Y N (D) will not damage producing formation or impair recovery from a Y N pool; and (E) will not circumvent 20 AAC 25.252 or 20 AAC 25.412. Y N APPR DATE GEOLOGY: ENGINEERING: UIC/Annular COMMISSION: RPC BEW(~~//-~.~ WM DWJ ,~,,"~ /_ R N C , co L~I,;~ " Comments/Instructions: M:cheklist rev 05/29/98 dlf: C:\msoffice\wordian\diana\checklist Well History File APPENDIX Information of detailed nature that is not particularly germane to the Well Permitting Process but is part of the history file. To improve the readability of the Well History file and to simplify finding information, information of this nature is accumulated at the end of the file under APPENDIX. No special effort has been made to chronologically organize this category of information. * ALASKA COMPUTING CENTER * . ............................ . ....... SCHLUMBERGER ....... COMPANY NAME : ARCO ALASKA INC. WELL NAME : DS2-O7A FIELD NAME : PRUDHOE BAY BOROUGH · NORTH SLOPE STATE : ALASKA API NUMBER : 500292015401 REFERENCE NO : 99060 LIS Tap~r-~erification Listing Schlumberger Alaska Computing Center PAGE: **** REEL HEADER **** SERVICE NAME : EDIT DATE : 99/02/19 ORIGIN : FLIC REEL NAME : 99060 CONTINUATION # : PREVIOUS REEL : COMMENT : ARCO ALASKA, PRUDHOE BAY, DS 2-07A, API #50-029-20154-01 **** TAPE HEADER **** SERVICE NAME : EDIT DATE : 99/02/19 ORIGIN : FLIC TAPE NAME : 99060 CONTINUATION # : 1 PREVIOUS TAPE : COMFiENT : ARCO ALASKA, PRUDHOE BAY, DS 2-07A, API #50-029-20154-01 TAPE HEADER PRUDHOE BAY CASED HOLE WIRELINE LOGS WELL NAME: DS2-O7A API NUMBER: 500292015401 OPERATOR: ARCO ALASKA INC. LOGGING COMPANY: SCHLUNiBERGER WELL SERVICES TAPE CREATION DATE: 19-FEB-99 JOB ArUMBER: 99060 LOGGING ENGINEER: HERRfMAArN OPERATOR WITNESS: D. CISMOSKI SURFACE LOCATION SECTION: 36 TOWNSHIP: 1 iN RANGE: 14E F~L: 1570 FSL: FEL: FWL : 1036 ELEVATION (FT FROM MSL O) KELLY BUSHING: DERRICK FLOOR: 58.77 GROUND LEVEL: 29.60 WELL CASING RECORD OPEN HOLE CASING DRILLERS CASING BiT SIZE (IN) SIZE (IN) DEPTH (FT) WEIGHT (LB/FT) 1ST STRING 7. 000 9748.0 26. O0 2ND STRING 4. 500 12802.0 12.60 3RD STRING PRODUCTION STRING CURVE SHIFT DATA - ALL PASSES TO STANDARD (MEASURED DEPTH) LIS Tape Verification Listing Schlumberger Alaska Computing Center BASELINE CURVE FOR SHIFTS LDWG TOOL CODE: MWD LDWG CURVE CODE: GR RUN NUMBER: 1 PASS ~ER : 1 DATE LOGGED: 30-JUL-98 LOGGING COMPANY: SPERRY SUN BASELINE DEPTH 88888.0 12591.5 12582.5 12554.5 12532.0 12507.0 12449.0 12390.5 12380.0 12375.0 12366.0 12361.0 12345.5 12325.5 12261.0 12251.0 12212.5 12176.0 12134.0 12132.5 12051.0 12039.0 12012.0 11990.5 11960.5 11951.5 11944.5 11907.5 11849.5 11843.0 11834.5 11796.0 11779.5 11771.0 11761.0 11725.5 11719.0 11698.5 11696.0 11673.0 11667.0 11664.5 11633.0 11610.0 11573.0 .......... EQUIVALENT UNSHIFTED DEPTH .......... GRCH CNT 88920.0 88920.0 12623.5 12623.5 12614.5 12614.5 12585.5 12585.5 12564.0 12564.0 12540.5 12540.5 12482.5 12482.5 12426.0 12413.5 12400.0 12394.5 12378.0 12357.5 12293.0 12281.5 12244.5 12207.5 12165 0 12162 0 12080 5 12069 0 12044 0 12022 0 11993 0 11983 5 11974 5 11940 0 11880 5 11875 0 11866 0 11826 5 11808 0 11801.0 11789.5 11757.0 11749.5 11731.0 11727.0 11704.0 11697.0 11693.0 11662.5 11641.5 11603.5 12410.5 12400 0 12394 5 12378 0 12357 5 12293 0 12281 5 12244 5 12207 5 12165.0 12162.0 12080.5 12069.0 12044.0 12022.0 11994.0 11984.0 11973.5 11940.0 11880.5 11875.0 11866.0 11826.5 11808.0 11801.0 11789.5 11757.0 11749.5 11727.0 11697.0 11662.5 11641.5 11603.5 PAGE: LIS Tap'~ ~erification Listing Schlumberger Alaska Computing Center 11538 0 11529 0 11521 0 11514 0 11490 0 11483 5 11482 5 11475 5 11470 0 11425.0 11400.5 11385.5 11373.5 11354.5 11347.0 11341.0 11311.0 11287.0 11261.0 11242.0 11206.5 11168.5 11089.5 11070.0 11022.0 10956.0 10928.0 10882.5 10864.0 10857.5 10824.0 10808.0 1O8OO. 0 10790.0 10782.5 10740.0 10738.5 10726.5 10700.0 10635.0 10628.0 10615.0 10606.0 10601.5 10563.0 10559.0 10512.0 10504.0 10482.0 10459.5 10451.5 10447.5 10435.5 10418.5 10415.5 10364.5 11570.0 11561.0 11554.0 11546.0 11522.0 11514.0 11501.5 11456.5 11431.0 11416.5 11402.0 11384.0 11376.5 11370.0 11340.5 11318.0 11291.5 11273.0 11237.5 11202.0 11123.0 11105.5 11055.0 10991.0 10963.0 10917.5 10896.0 10855.0 10840.0 10830.5 10821.5 10815.0 10770.0 10757 5 10731 5 10665 5 10660 0 10647 5 10638 5 10594 0 10591 0 10545 0 10536 0 10512 5 10491 0 10483 5 10478 0 10465.0 10442.5 10393.0 11570.0 11561.0 11554.0 11546.0 11522.0 11516.5 11514.0 11509.0 11501.5 11456.5 11431.0 11416.5 11402.0 11384.0 11376.5 11370.0 11340.5 11318.0 11291.5 11273.0 11237.5 11202 0 11123 0 11105 5 11055 0 10991 0 10964 0 10917 5 10896.0 10889 0 10855 0 10840 0 10830 5 10821 5 10815 0 10770 0 10757 5 10731 5 10665 5 10660 0 10647 5 10638 5 10635 5 10591.0 10543.5 10536.5 10512.5 10491.0 10483.5 10476.5 10465.0 10447.5 i 0394.5 19-FEB-19~lS:00 PAGE: LIS Tap~'~Verification Listing Schlumberger Alaska Computing Center 10361.5 10342.0 10335.5 10304.5 10300.5 10286.5 10274.0 10263 0 10261 0 10238 0 10230 5 10221 5 10214 0 10176 5 10176 0 10126 0 10124 0 10091 0 10088 5 10032.0 10029.5 9996.0 9994.0 9966.0 9953.0 9920.0 9902.0 9901.0 9880.0 9856.5 9848.5 9842.0 9830.0 9783.0 9781.5 974 O. 5 9739.0 9701.0 9700.0 9686.5 9665.5 9643.5 9623.5 9617.0 9588.0 9569.5 9546.5 9534.5 9525.5 9506.5 9503.0 9498.0 9480.0 9464.0 9455.5 100.0 10390.0 10369.0 10360.5 10329.5 10311.0 10286.0 10262.5 10245.0 10199.5 10147.5 10112.5 10054.0 10018.5 9988.5 9943.5 9924.5 9879.5 9865.5 9853.5 9807.0 9765.0 9763.0 9724 0 9709 0 9690 0 9668 0 9650 0 9642 0 9610 0 9593.0 9559.5 9530.5 9527.0 9520.0 9502.5 9483.5 9471.5 116.0 19-~B-199~'~5:00 10328.0 10300.0 10288.5 10256.5 10239.0 10200.0 10147.5 10112.5 10054.0 10018.5 9978.0 9927.0 9905.5 9874.0 9807.5 9724.0 9709.0 9690 0 9667 0 9650 0 9642 0 9610 0 9593 0 9572.0 9559.5 9551.0 9530.5 9527.0 9519.5 9502.5 9486.5 122.5 PAGE: LIS Tap$ ~erification Listing Schlumberger Alaska Computing Center ~9-FEm-19~S:O0 CONTAINED HEREIN IS LDWG FORMATTED MCNL DATA ACQUIRED ON ARCO ALASKA'S DS2-O7A WELL. THE DEPTH SHIFTS SEEN ABOVE REFLECT DEPTH CORRELATION BETWEEN BASE PASS #1 GRCH AND SPERRY SUN'S MWD GR, ALSO BETWEEN BASE PASS #1 NRAT AND SPERRY SUN'S MWD GR. WHERE THERE IS MISSING DATA IN THE MWD GR THE MCNL DATA WAS DEPTH CORRELATED TO SCHLUMBERGER'S AIT GR ACQUIRED ON 16-JUL-98 WHICH WAS TIED TO THE MWD GR. $ $ PAGE: **** FILE HEADER **** FILE NAME : EDIT .001 SERVICE : FLIC VERSION : O01CO1 DATE : 99/02/19 MAX REC SIZE : 1024 FILE TYPE : LO LAST FILE : FILE HEADER FILE AUJMBER: 1 EDITED CURVES Depth shifted and clipped curves for each pass in separate files. PASS NUMBER: 1 DEPTH INCREM~ENT: 0. 5000 FILE SUNk43hgY LDWG TOOL CODE START DEPTH STOP DEPTH GRCH 12662.0 9464.0 CNT 12667.0 9479.0 $ CURVE SHIFT DATA - PASS TO PASS (MEASURED DEPTH) BASELINE CURVE FOR SHIFTS LDWG CURVE CODE: PASS NUMBER: BASELINE DEPTH $ .......... EQUIVALEA~f UNSHIFTED DEPTH GRCH CNT REMARKS: THIS FILE CONTAINS MCNL BASE PASS #1. PASS SHIFTING HAS BEEN DONE. $ LIS FORMAT DATA NO PASS TO LIS Tape Verification Listing Schlumberger Alaska Computing Center PAGE: 6 ** DATA FORMAT SPECIFICATION RECORD ** ** SET TYPE - 64EB ** TYPE REPR CODE VALUE 1 66 0 2 66 0 3 73 32 4 66 1 5 66 6 73 7 65 8 68 0.5 9 65 FT 11 66 32 12 68 13 66 0 14 65 FT 15 66 68 16 66 1 0 66 0 ** SET TYPE - CHAN ** NAME SERV UNIT SERVICE API API API API FILE NUMB NUMB SIZE REPR PROCESS ID ORDER # LOG TYPE CLASS MOD NUMB SAMP ELEM CODE (HEX) DEPT FT O0 000 O0 0 1 ! 1 4 68 0000000000 GRCH CNT GAPI O0 000 O0 0 1 1 ! 4 68 0000000000 NCNT CNT CPS O0 000 O0 0 1 1 1 4 68 0000000000 FCNT CNT CPS O0 000 O0 0 1 1 1 4 68 0000000000 NRAT CNT O0 000 O0 0 1 1 1 4 68 0000000000 CCL CNT V O0 000 O0 0 1 1 1 4 68 0000000000 GR MWD GAPI O0 000 O0 0 1 1 1 4 68 0000000000 GR AIT GAPI O0 000 O0 0 1 1 1 4 68 0000000000 ** DATA ** DEPT. 12786.000 GRCH. CNT -999.250 NClTT. CNT -999.250 FCNT. CNT -999.250 NRAT. CNT -999.250 CCL.CNT -999.250 GR.I~WD 31.946 GR.AIT -999.250 DEPT. 7413.500 GRCH. CNT -999.250 NCNT. CNT -999.250 FCNT. CNT -999.250 NRAT. CNT -999.250 CCL.CNT -999.250 GR.MWD 55.541 GR.AIT -999.250 ** END OF DATA ** LIS Tap~V-Verification Listing Schlumberger Alaska Computing Center PAGE: **** FILE TRAILER **** FILE NAME : EDIT .001 SERVICE : FLIC VERSION : O01CO1 DATE : 99/02/19 MAX REC SIZE : 1024 FILE TYPE : LO LAST FILE : **** FILE HEADER **** FILE NAME : EDIT .002 SERVICE : FLIC VERSION ' O01CO1 DATE : 99/02/19 MAX REC SIZE : 1024 FILE TYPE : LO LAST FILE : FILE HEA19ER FILE NTJ~4BER: 2 EDITED CURVES Depth shifted and clipped curves for each pass in separate files. PASS NUMBER: 2 DEPTH INCRE~IENT: O. 5000 FILE SU~k4ARY LDWG TOOL CODE START DEPTH STOP DEPTH GRCH 12670.0 9426.0 CNT 12677.5 9432.5 $ CURVE SHIFT DATA - PASS TO PASS (MEASURED DEPTH) BASELINE CURVE FOR SHIFTS LDWG CURVE CODE: GRCH PASS NUMBER: 1 BASELINE DEPTH 88888.0 12595.5 12591.5 12582.5 12580.0 12554 5 12534 5 12532 0 12511 5 12507 0 12492 0 .......... EQUIVALENT UNSHIFTED DEPTH .......... GRCH CNT .............. 88919.0 12626.5 12610.0 12563.5 12540.0 88920.5 12624.0 12614.5 12585.5 12562.5 12540.0 12523.0 LIS Tape Verification Listing Schlumberger Alaska Computing Center 19-FEB-1999 15:00 PAGE: 12489.5 12449.0 12436.5 12428.0 12426.0 12405.5 12384.5 12382.5 12375.0 12366.0 12361.0 12358.0 12350.0 12345.5 12327.0 12325.5 12272.0 12264.0 12261.0 12251.0 12212.5 12203.0 12197.0 12194.0 12184.0 12176.0 12162 0 12139 5 12134 0 12132 5 12103 0 12051 0 12042 0 12039 0 12013.0 11998.5 11992.0 11990.5 11962.5 11960.5 11951.5 11945.5 11944.5 11917.0 11907.5 11905.5 11900.5 11881.5 11855.5 11851.0 11849.5 11843.0 11834.5 11832.5 11826.0 12517.5 12465.5 12413.0 12411.5 12378.0 12355.5 12293.0 12221.5 12211.0 12165.0 12129.0 12068.5 12022.0 11993.0 11974.0 11878.5 11862.0 12482.5 12462.5 12459.5 12438.0 12410.5 12400.0 12394.5 12391.0 12378.0 12357.5 12303.5 12293.0 12281.5 12244.5 12233.0 12225.0 12207.5 12194.5 12165.0 12162.0 12080.5 12069.0 12044.0 12030.5 12022.0 11992.0 11984.0 11973.5 11947.5 11937.0 11935.0 11928.5 11909.5 11887.5 11880.5 11875.0 11866.0 11855.0 LIS Tape Verification Listing Schlumberger Alaska Computing Center 19-FEB-1999 15:00 PAGE: 11796.0 11826.5 11779.5 11808.0 11771.0 11801.0 11761.0 11789.5 11725.5 11757.0 11719.0 11749.5 11699.0 11731.0 11696.5 11727.0 11696.0 11727.0 11674.5 11703.0 11667.0 11697.0 11636.5 11664.0 11633.0 11662.5 11610.0 11641.5 11573.0 11603.5 11569.5 11595.5 11537.5 11564.5 11531.5 11560.5 11522.5 11551.5 11518.5 11546.0 11507.0 11535.0 11506.5 11534.0 11496.5 11522.5 11487.5 11514.0 11485.0 11511.0 11450.0 11477.5 11429.0 11458.0 11425.0 11456.5 11417.0 11446.5 11400.5 11431.0 11385.5 11416.5 11373.5 11402.0 11358.5 11390.0 11354.5 11385.5 11352.0 11384.0 11347.0 11376.5 11341.0 11371.5 11338.5 11370.0 11332.5 11366.0 11311.0 11340.5 11290.5 11322.0 11287.0 11318.0 11261.0 11291.5 11249.5 11283.0 11242.0 11273.0 11235.5 11269.0 11227.5 11258.0 11222.0 11251.0 11210.0 11240.0 11206.5 11237.5 11180.5 11211.0 11173.0 11204.0 11168.5 11202.0 11144.5 11179.0 11104.0 11136.5 LIS Tap~erification Listing Schlumberger Alaska Computing Center 19-FEB-199~---~5:00 PAGE: 10 11098 0 11089 5 11074 5 11070 0 11066 0 11042 5 11034 0 11024 0 11022 0 11011 0 10991 5 10956 0 10950.0 10946.5 10935.5 10929.5 10928.0 10911.5 10883.0 10882.5 10871.0 10864.0 10862.0 10858.0 10857.5 10837.0 10824.0 10823.0 10809.0 10808.0 1O8OO. 0 10790.0 10782.5 10779.0 10770.5 10750.5 10749.0 10738.5 10735.0 10726.5 10716.5 10711.5 10700.5 10700.0 10654.0 10636.0 10635.0 10628.0 10615.5 10615.0 10608.5 10606.0 10601.5 1O58O. 5 10564.5 11132.5 11108.5 11066.5 11057.5 11024.0 10980.0 10968.5 10963.0 10945.5 10917.5 10900.0 10893.5 10890.5 10867.5 10855.0 10840.0 10810.0 10799.5 10780.0 10765.0 10741.5 10731.5 10684.5 10665.5 10647.0 10638.5 10611.0 10594.5 11123.0 11105.5 11102.5 11074.5 11055.0 11045.5 10991.0 10982.5 10964.0 10917.5 10896.0 10889.0 10855.0 10840.0 10830.5 10821.5 10815.0 10778.5 10770.0 10757.5 10746.5 10731.5 10664.5 10660.0 10647.5 10638.5 10635.5 LIS Tape Verification Listing Schlumberger Alaska Computing Center PAGE: 11 10559.0 10512.0 10504.0 10482.0 10459.5 10455.0 10451.5 10450.5 10447.5 10435.5 10433.0 10418.5 10415 5 10367 5 10364 5 10342 5 10325 5 10303 0 10300 5 10274 0 10263 0 10261 5 10238 0 10233 0 10230 5 10221 5 10214 0 10177 5 10176 0 10126 0 10124.0 1O088.5 10085.5 10032.5 10029.5 9996.5 9994.0 9966.5 9963.0 9956.0 9953.0 9921.0 9919.5 9914.0 9907.0 9902.0 9901.5 9887.5 9887.0 9880.0 9858.5 9857.5 9850.5 9848.5 9825.0 10536.0 10485.5 10480.5 10461.5 10442.5 10393.0 10369.0 10350.0 10328.0 10286.0 10262.5 10257.0 10244.5 10200.0 10147.0 10106.5 10054.0 10018.5 9988.5 9979.0 9943.5 9924.5 991 O. 0 9880.0 9848.5 10591.0 10543.5 10536.5 10512.5 10491.0 10483.5 10476.5 10465.0 10447.5 10393.5 10328.0 10300.0 10288.5 10256.5 10238.5 10200.0 10147.0 10112.5 10054.0 10018.5 9987.0 9978.0 9943.5 9938.5 9930.5 9927.0 9912.5 9905.5 9883.0 9875.5 9873.0 LIS Tape Verification Listing Schlumberger Alaska Computing Center PAGE: 12 9793.0 9788.0 9781.5 9741.0 9739.5 9717.0 9715.0 9700.0 9695.0 9687.0 9676.0 9671.5 9665.5 9651.0 9644.0 9638.0 9617.0 9612.0 9604.0 9588.0 9586.5 9584.0 9570.0 9569.5 9562.0 9546.5 9534.5 9525.5 9515.0 9507.5 9506.5 9503 0 9498 0 9488 5 9480 0 9471 0 100 0 9811.0 9765.0 9763.0 9740.5 9724.0 9675.0 9668.0 9638.0 9608.0 9592.5 9585.5 9538.5 9530.5 9504.0 9495.0 124.0 9818.5 9807.5 9738.5 9721.0 9712.5 9696.5 9694.0 9690.0 9661.5 9642.0 9626.5 9610.0 9605.5 9593.0 9572.0 9559.5 9551.0 9530.5 9527.0' 9519.5 9512.0 9502.5 122.5 REMARKS: THIS FILE CONTAINS MCNL BASE PASS #2. THE DEPTH SHIFTS SHOWN ABOVE REFLECT DEPTH CORRELATIONS BETWEEN GRCH PASS #2 AND GRCH PASS #1, ALSO NRAT PASS #2 A~ NtLAT PASS #1 CARRYING ALL CNT CURVES WITH THE NRAT SHIFTS. $ LIS FORMAT DATA LIS Tape Verification Listing Schlumberger Alaska Computing Center PAGE: 13 ** DATA FORMAT SPECIFICATION RECORD ** ** SET TYPE - 64EB ** .............................. TYPE REPR CODE VALUE 1 66 0 2 66 0 3 73 24 4 66 1 5 66 6 73 7 65 8 68 0.5 9 65 FT 11 66 42 12 68 13 66 0 14 65 FT 15 66 68 16 66 1 0 66 1 ** SET TYPE - CHAN ** NAME SERV UNIT SERVICE API API API API FILE NUMB NUMB SIZE REPR PROCESS ID ORDER # LOG TYPE CLASS MOD ~ SAMP ELE~ CODE (HEX) DEPT FT O0 000 O0 0 2 1 1 4 68 0000000000 GRCH CNT GAPI O0 000 O0 0 2 1 1 4 68 0000000000 NCNT CNT CPS O0 000 O0 0 2 1 1 4 68 0000000000 FCNT CNT CPS O0 000 O0 0 2 1 1 4 68 0000000000 NRAT CNT O0 000 O0 0 2 1 1 4 68 0000000000 CCL CNT V O0 000 O0 0 2 1 1 4 68 0000000000 ** DATA ** DEPT. 12677. 500 GRCH. CNT -999. 250 NRAT. CNT 17. 905 CCL. CNT -999. 250 DEPT. 9426.000 GRCH. CNT 29.760 NRAT. CNT -999.250 CCL.CNT -999.250 NCNT. CNT 6215.699 FCNT. CNT 321.855 NCNT. CNT -999.250 FCNT. CNT -999.250 ** END OF DATA ** LIS Tape"Verification Listing Schlumberger Alaska Computing Center 19-FEB-199g 15:00 PAGE: 14 **** FILE TRAILER **** FILE NAME : EDIT .002 SERVICE · FLIC VERSION : O01CO1 DATE : 99/02/19 MAX REC SIZE : 1024 FILE TYPE : LO LAST FILE : **** FILE HEADER **** FILE NAME : EDIT .003 SERVICE · FLIC VERSION · O01CO1 DATE : 99/02/19 MAX REC SIZE : 1024 FILE TYPE : LO LAST FILE : FILE HEADER FILE NUMBER: 3 AVERAGED CURVES Compensated Neutron: Arithmetic average of edited passes for all curves. DEPTH INCREMENT 0. 5000 PASSES INCLUDED IN AVERAGE LDWG TOOL CODE PASS NUMBERS 1, 2, CNT $ REMARKS: THIS FILE CONTAINS THE ARITHMETIC AVERAGE OF BASE PASSES 1 AND 2. AVERAGING WAS DONE AFTER DATA WAS CLIPPED FOR INVALID READINGS AND AFTER DEPTH MATCHING. $ LIS FORMAT DATA ** DATA FORMAT SPECIFICATION RECORD ** ** SET TYPE - 64EB ** TYPE REPR CODE VALUE 1 66 0 2 66 0 3 73 20 4 66 1 5 66 LIS Tape Verification Listing Schlumberger Alaska Computing Center 19-FEB-1999 15:00 PAGE: 15 TYPE REPR CODE VALUE .............................. 6 73 7 65 8 68 0.5 9 65 FT 11 66 51 12 68 13 66 0 14 65 FT 15 66 68 16 66 1 0 66 1 ** SET TYPE - CHAN ** NAME SERV UNIT SERVICE API API API API FILE NIk4B NUmB SIZE REPR PROCESS ID ORDER # LOG TYPE CLASS MOD NUM~ SAMP ELE~ CODE (HEX) DEPT FT O0 000 O0 0 3 1 1 4 68 0000000000 GRCH CNT GAPI O0 000 O0 0 3 1 1 4 68 0000000000 NCNT CNAV CPS O0 000 O0 0 3 1 1 4 68 0000000000 FCNT CNAV CPS O0 000 O0 0 3 1 1 4 68 0000000000 NRAT CNAV O0 000 O0 0 3 1 1 4 68 0000000000 ** DATA DEPT. 12667.000 GRCH. CNT -999.250 NCNT. CNAV 5896.856 FCNT. CNAV 289.785 NRAT. CNAV 18.683 DEPT. 9464.000 GRCH. CNT NRAT. CNAV -999.250 54.706 NCNT. CNAV -999.250 FCNT. CNAV -999.250 ** END OF DATA ** **** FILE TRAILER **** FILE NAME : EDIT .003 SERVICE : FLIC VERSION : O01CO1 DATE : 99/02/19 MAX REC SIZE : 1024 FILE TYPE : LO LAST FILE : LIS Tape Verification Listing Schlumberger Alaska Computing Center 19-FEB-19~5:00 PAGE: 16 **** FILE HEADER **** FILE NAME : EDIT .004 SERVICE : FLIC VERSION · O01CO1 DATE : 99/02/19 MAX REC SIZE : 1024 FILE TYPE : LO LAST FILE : FILE HEADER FILE NIIMBER 4 RAW CURVES Curves and log header data for each pass in separate files; raw background pass in last file PASS NUMBER: 1 DEPTH INCREMENT: 0.1000 FILE SUM~4ARY VENDOR TOOL CODE START DEPTH MCNL 12647.6 $ LOG HEADER DATA STOP DEPTH .......... 9445.1 DATE LOGGED: SOFTWARE VERSION: TIME LOGGER ON BOTTOM: TD DRILLER (FT) : TD LOGGER (FT) : TOP LOG INTERVAL (FT) : BOTTOM LOG INTERVAL (FT) : LOGGING SPEED (FPHR) : DEPTH CONTROL USED (YES/NO): il-NOV-98 RELOO35E 12712.0 9402.0 12645.0 NO TOOL STRING (TOP TO BOTTOM) VENDOR TOOL CODE TOOL TYPE TOOL NLrMBER CCL COLLAR LOCATOR MCCL-iO1 GR GANk~A RAY MGR-18 MCNL COMPENSATED N~UTRON LTTN-A13 $ BOREHOLE AND CASING DATA OPEN HOLE BIT SIZE (IN): DRILLERS CASING DEPTH (FT) : LOGGERS CASING DEPTH (FT): BOREHOLE CONDITIONS FLUID TYPE: FLUID DENSITY (LB/G) : SURFACE TEMPERATURE (DEGF) : BOTTOM HOLE TEMPERATURE (DEGF) : FLUID SALINITY (PPM) : 12802.0 12802.0 LIS Tape 'Verification Listing Schlumberger Alaska Computing Center PAGE: 17 FLUID LEVEL (FT) : FLUID RATE AT WELLHEAD (BPM) : WATER CUTS (PCT) : GAS~OIL RATIO: CHOKE (DEG) : NEUTRON TOOL TOOL TYPE (EPITHERMAL OR THERMAL): MATRIX: MATRIX DENSITY: HOLE CORRECTION (IN): THERMAL SANDSTONE 2.65 BLUELINE COUNT RATE NORMALIZATION IN OIL ZONE TOP NORMALIZING WINDOW (FT) : BASE NORMALIZING WINDOW (FT): BLUELINE COUNT RATE SCALES SET BY FIELD ENGINEER FAR COUNT RATE LOW SCALE (CPS): 0 FAR COUNT RATE HIGH SCALE (CPS): 1500 NEAR COUNT RATE LOW SCALE (CPS): 0 NEAR COUNT RATE HIGH SCALE (CPS): 37000 TOOL STANDOFF (IN): 1.0 REMARKS: DEPTH CORRELATED TO SPERRY SUN MWD LOG DATED 6 TO 30 JULY 1998. WELL TEST DATA REPORTED ON PROPOSED LOGGING PROGRAM (DATE UNKNOWN): OIL=llO1 BOPD GOR=20, 612 SCF/STB, WATER CUT= O. 0%. BORAX PASS #1 STARTED UP FROM 12492' ND INSTEAD OF CLOSER TO TD. COIL WOULD NOT DESCEND ANY FURTHER. THE MORE ATTEMPTS MADE THE HIGHER TD BECABiE. CLIENT SUSPECTS THE COIL WAS GETTING DIFFERENTIALLY STUCK. NOTE: EVEN AT 4.5 BBLS/MIN BORAX PUMP RATE, WHP = O.O. WELL IS ACTUALLY ON A VACUUM. LIKEWISE BORAX PASS #2 STARTED AT 12170' MD. THE DRILLERS TALLY INDICATES THAT THE 7" CASING BOTTOM IS AT 9748' ND. ALL PUMPING WAS DOWN THE BACKSIDE. NOTE: WELL VOLUME=193 BBLS. PUMPING TALLY: A. AFTER FLOWING PASS #2, 338 BBLS CRUDE WERE PUMPED PRIOR TO LOGGING CRUDE BASELINE PASS #1. DURING THIS PASS, PUMPED CRUDE AT 3 BBLS/MIN UNTIL REACHED APPROX. 10425 FT MD. THEN LOWERED TO 2BBLS/MIN. NOTE: PUMP WAS OFF BETWEEN 1J0920 AND 10780'. B. AT START OF CRUDE BASELINE PASS #2, 688 BBLS CRUDE HAD BEEN PUMPED. PUMPED AT 2 BBLS/MIN DURING LOGGING. AT 10300', AFTER 846 TOTAL BBLS CRUDE HAD BEEN PUMPED, SWITCHED TO BORAX AT 2 BBLS/MIN. C. AT STARTOF BORA~ PASS #1, 300 BBLS OF BORAX HAD BEEN PUMPED. PUMPED 2 BBLS/MiN DURING LOGGING. D. AT STARTOF BORAX PASS #2, 534 BBLS OF BORAX LIS Tape 'verification Listing Schlumberger Alaska Computing Center PAGE: 18 HAD BEEN PUMPED. PUMPED 2 BBLS/MIN DO-RING LOGGING. AT 640 BBLS BORAX PUMPED, SWITCHED BACK TO PUMPING CRUDE. PUMPED ONLY 54 BBLS CRUDE AT 2BBLS/MIN BY END OF PASS. E. AFTER BORAX PASS #2, PUMPED ANOTHER 116 BBLS CRUDE AND THEN 10 BBLS OF METHANOL. F. PUMP TOTALS: CRUDE=lO16 BBLS, BORAX= 640 BBLS, METHANOL=I 0 BBLS TAGGED TD AT 12656' ~ID. FIELD PICKED GOC AT 10281' ~iD. PACKER AT 9514' ~4D APP~S TO BE LEAKING SOME. TEMPERATURE INDICATES GAS IS COMING FROM BETWEEN 12550 TO 12610' I4D. THIS FILE CONTAINS RAW BASE PASS #1 SAMPLED @.5 '. $ LIS FORMAT DATA ** DATA FORMAT SPECIFICATION RECORD ** ** SET TYPE - 64EB ** TYPE REPR CODE VALUE 1 66 0 2 66 0 3 73 28 4 66 1 5 66 6 73 7 65 8 68 0.1 9 65 FT 11 66 36 12 68 13 66 0 14 65 FT 15 66 68 16 66 1 0 66 1 ** SET TYPE - CHAN ** NAME SERV UNIT SERVICE API API API API FILE NUMB NUMB SIZE REPR PROCESS ID ORDER # LOG TYPE CLASS MOD NUMB SAMP ELEM CODE (HEX) DEPT FT O0 000 O0 0 4 1 1 4 68 0000000000 CVEL PS1 F/HR O0 000 O0 0 4 ! 1 4 68 0000000000 GR PS1 GAPI O0 000 O0 0 4 1 1 4 68 0000000000 NCNT PS1 CPS O0 000 O0 0 4 i 1 4 68 0000000000 LIS Tape Verification Listing Schlumberger Alaska Computing Center 19-FEB-19~F~'5:00 PAGE: 19 NAME SERV UNIT SERVICE API API API API FILE ~ ~B SIZE REPR PROCESS ID ORDER # LOG TYPE CLASS MOD NLrMB SAMP ELaM CODE (HEX) FCAUfPS1 CPS O0 000 O0 0 4 1 1 4 68 0000000000 NRAT PS1 O0 000 O0 0 4 1 1 4 68 0000000000 CCLD PS1 V O0 000 O0 0 4 1 1 4 68 0000000000 ** DATA ** DEPT. 12647.668 CVEL. PS1 0.000 GR.PS1 -999.250 NCNT. PS1 FCNT. PS1 -999.250 NRAT. PS1 -999.250 CCLD.PS1 -999.250 DEPT. 9445.168 CVEL.PS1 -999.250 GR.PS1 -999.250 NCNT. PS1 FCNT. PS1 -999.250 NRAT. PS1 -999.250 CCLD.PS1 88.750 -999.250 -999.250 ** END OF DATA ** **** FILE TRAILER **** FILE NAI~E : EDIT .004 SERVICE : FLIC VERSION ' O01CO1 DATE : 99/02/19 MAX REC SIZE : 1024 FILE TYPE : LO LAST FILE : **** FILE HEADER **** FILE NAME : EDIT .005 SERVICE . FLIC VERSION · O01CO1 DATE : 99/02/19 MAX REC SIZE : 1024 FILE TYPE : LO LAST FILE : FILE HEA1DER FILE AHIMBER 5 RAW CURVES Curves and log header data for each pass in separate files; raw background pass in last file PASS NIJMBER: 2 DEPTH INCREMENT: 0.1000 FILE SUMMARY VENDOR TOOL CODE START DEPTH STOP DEPTH LIS Tape verification Listing Schlumberger Alaska Computing Center 19-FEB-19~-~is:00 PAGE: 2O MCNL $ LOG HEADER DATA 12647.6 DATE LOGGED: SOFTWARE VERSION: TIME LOGGER ON BOTTOM: TD DRILLER (FT) : TD LOGGER (FT) : TOP LOG INTERVAL (FT) : BOTTOM LOG INTERVAL (FT) : LOGGING SPEED (FPHR) : DEPTH CONTROL USED (YES/NO) 9445.1 TOOL STRING (TOP TO BOTTOM) VENDOR TOOL CODE TOOL TYPE CCL COLLAR LOCATOR GR GAMMA RAY MCNL COMPENSATED NEUTRON BOREHOLE AND CASING DATA OPEN HOLE BIT SIZE (IN) DRILLERS CASING DEPTH (FT) LOGGERS CASING DEPTH (FT) BOREHOLE CONDITIONS FLUID TYPE: FLUID DENSITY (LB/G): SURFACE TEMPERATURE (DEGF) : BOTTOM HOLE TEMPERATURE (DEGF) : FLUID SALINITY (PPM) : FLUID LEVEL (FT) : FLUID RATE AT WELLHEAD (BPM) : WATER CUTS (PCT) : GAS~OIL RATIO: CHOKE (DEG) : NEUTRON TOOL TOOL TYPE (EPITHERMAL OR THERMAL) : MATRIX: MATRIX DENSITY: HOLE CORRECTION (IN): BLUELINE COUNT RATE NORMALIZATION IN OIL ZONE TOP NORMALIZING WINDOW (FT): BASE NORMALIZING WINDOW (FT) : BLUELINE COUN~f RATE SCALES SET BY FIELD ENGINEER FAR COUNT RATE LOW SCALE (CPS): 0 FAR COUNT RATE HIGh- SCALE (CPS): 1500 NEAR COUNT RATE LOW SCALE (CPS): 0 NEAR COUNT RATE HIGH SCALE (CPS): 37000 TOOL STANDOFF (IN): 1.0 il-NOV-98 RELOO35E 12712.0 9402.0 12645.0 NO TOOLNUMBER MCCL- 1 O1 MGR ~ 18 LTTN-A13 12802.0 12802.0 THERMAL SANDSTONE 2.65 LIS Tape Verification Listing Schlumberger Alaska Computing Center 19-FEB-19~5~5 : 00 PAGE: 2O MCNL $ LOG HEADER DATA 12647.6 9445.1 DATE LOGGED: SOFTWARE VERSION: TIME LOGGER ON BOTTOM: TD DRILLER (FT) : TD LOGGER (FT) : TOP LOG INTERVAL (FT) : BOTTOM LOG INTERVAL (FT) : LOGGING SPEED (FPHR): DEPTH CONTROL USED (YES/NO): il-NOV-98 RELOO35E 12712.0 9402.0 12645.0 NO TOOL STRING (TOP TO BOTTOM) VENDOR TOOL CODE TOOL TYPE TOOL NUMBER CCL COLLAR LOCATOR MCCL-IO1 GR GAMMA RAY MGR-18 MCNL COMPENSATED NEUTRON LTTN-A13 $ BOREHOLE AND CASING DATA OPEN HOLE BIT SIZE (IN): DRILLERS CASING DEPTH (FT) : LOGGERS CASING DEPTH (FT) : BOREHOLE CONDITIONS FLUID TYPE: FLUID DENSITY (LB/G): SURFACE TEMPERATURE (DEGF) : BOTTOM HOLE TEMPERATURE (DEG?) : FLUID SALINITY (PPM) : FLUID LEVEL (FT) : FLUID RATE AT WELLHEAD (BPM) : WATER CUTS (PCT) : GAS~OIL RATIO: CHOKE (DEG) : NEUTRON TOOL TOOL TYPE (EPITHERMAL OR THERMAL): MATRIX: MATRIX DENSITY: HOLE CORRECTION (IN): BLUELINE COUNT RATE NORMALIZATION IN OIL ZONE TOP NORMALIZING WINDOW (FT) : BASE NORMALIZING WINDOW (FT) : BLUELINE COUNT RATE SCALES SET BY FIELD ENGINEER FAR COUNT RATE LOW SCALE (CPS): 0 FAR COUNT RATE HIGH SCALE (CPS): 1500 NEAR COUNT RATE LOW SCALE (CPS): 0 NEAR COUNT RATE HIGH SCALE (CPS): 37000 TOOL STANDOFF (IN): 1.0 12802.0 12802.0 THERMAL SANDSTONE 2.65 LIS Tape Verification Listing Schlumberger Alaska Computing Center PAGE: 21 REMARKS: DEPTH CORRELATED TO SPERRY SUN MWD LOG DATED 6 TO 30 JYILY 1998. WELL TEST DATA REPORTED ON PROPOSED LOGGING PROGRAM (DATE UNKNOWN) ~ OIL=llO1 BOPD GOR=20, 612 SCF/STB, WATER CUT= 0.0%. BORAX PASS #1 STARTED UP FROM 12492' ~4D INSTEAD OF CLOSER TO TD. COIL WOULD NOT DESCEND ANY FURTHER. THE MORE ATTEMPTS MADE THE HIGHER TD BECAME. CLIENT SUSPECTS THE COIL WAS GETTING DIFFERENTIALLY STUCK. NOTE: EVEN AT 4.5 BBLS/MIN BORAX PUMP RATE, WHP = O.O. WELL IS ACTUALLY ON A VACUUM. LIKEWISE BORAX PASS #2 STARTED AT 12170' MD. THE DRILLERS TALLY INDICATES THAT THE 7" CASING BOTTOM IS AT 9748' MD. ALL PUMPING WAS DOWN THE BACKSIDE. NOTE: WELL VOLUME=193 BBLS. PUMPING TALLY: A. AFTER FLOWING PASS #2, 338 BBLS CRUDE WERE PUMPED PRIOR TO LOGGING CRUDE BASELINE PASS #1. DURING THIS PASS, PUMPED CRUDE AT 3 BBLS/MIN UNTIL REACHED APPROX. 10425 FT MD. THEN LOWERED TO 2BBLS/MIN. NOTE: PUMP WAS OFF BETWEEN 1J0920 AND 10780'. B. AT START OF CRUDE BASELINE PASS #2, 688 BBLS CRUDE HAD BEEN PUMPED. PUMPED AT 2 BBLS/MIN DURING LOGGING. AT 10300', AFTER 846 TOTAL BBLS CRUDE HAD BEEN PUMPED, SWITCHED TO BORAX AT 2 BBLS/MIN. C. AT START OF BORAX PASS #1, 300 BBLS OF BORAX HAD BEEN PUMPED. PUMPED 2 BBLS/MIN DURING LOGGING. D. AT START OF BORAX PASS #2, 534 BBLS OF BORAX HAD BEEN PUMPED. PUMPED 2 BBLS/MIN DURING LOGGING. AT 640 BBLS BORAX PUMPED, SWITCHED BACK TO PUMPING CRUDE. PUMPED ONLY 54 BBLS CRUDE AT 2BBLS/MIN BY END OF PASS. E. AFTER BORAX PASS #2, PUMPED ANOTHER 116 BBLS CRUDE AND THEN 10 BBLS OF METHANOL. F. PUMP TOTALS: CRUDE=lO16 BBLS, BORAX= 640 BBLS, METHANOL=I 0 BBLS TAGGED TD AT 12 656 ' MD. FIELD PICKED GOC AT 10281' MD. PACKER AT 9514' MD APPEARS TO BE LEAKING SOME. TEMPERATURE INDICATES GAS IS COMING FROM BETWEEN 12550 TO 12610' MD. THIS FILE CONTAINS RAW BASE PASS #2 SAMPLED @.5 '. $ LIS FORMAT DATA LIS Tape-Verification Listing Schlumberger Alaska Computing Center 19-FEB-199~m5:00 PAGE: 23 **** FILE TRAILER **** FILE NAME : EDIT .005 SERVICE : FLIC VERSION : O01CO1 DATE : 99/02/19 MAX REC SIZE : 1024 FILE TYPE : LO LAST FILE : **** TAPE TRAILER **** SERVICE NAME : EDIT DATE : 99/02/19 ORIGIN : FLIC TAPE NAME : 99060 CONTINUATION # : 1 PREVIOUS TAPE : COI~2VT : ARCO ALASKA, PRUDHOE BAY, DS 2-07A, API #50-029-20154-01 **** REEL TRAILER **** SERVICE NAME : EDIT DATE : 99/02/19 ORIGIN · FLIC REEL NAME · 99060 CONTINUATION # : PREVIOUS REEL : COI~4ENT : ARCO ALASKA, PRUDHOE BAY, DS 2-07A, API #50-029-20154-01 * ALASKA COMPUTING CENTER * ....... SCHLUlVlBERGER ....... COMPANY NAME : ARCO ALASKA, INC. WELL NAME : DS2-O7A FIELD NAME : PRUDHOE BAY BOROUGH : NORTH SLOPE STATE : ALASKA API NUMBER : 500292015401 REFERENCE NO : 98421 R:r' VED · ..~ 2. 4 1999 LIS Tape V~fication Listing Schlumberger Alaska Computing Center 18-FEB-1999 17:30 PAGE: **** REEL HEADER **** SERVICE NAME : EDIT DATE : 99/02/18 ORIGIN : FLIC REEL NAME : 98421 CONTINUATION # : PREVIOUS REEL : COMMENT : ARCO ALASKA, INC., DS 2-07A, PRUDHOE BAY, #50-029-20154-01 **** TAPE HEADER **** SERVICE NAME : EDIT DATE : 99/02/18 ORIGIN : FLIC TAPE NAME : 98421 CONTINUATION # : 1 PREVIOUS TAPE : CO[4MENT : ARCO ALASKA, INC., DS 2-07A, PRUDHOE BAY, #50-029-20154-01 TAPE HEADER PRUDHOE BAY OPEN HOLE WIRELINELOGS WELL NAME: API NUMBER: OPERATOR: LOGGING COMPANY: TAPE CREATION DATE: JOB DATA JOB NUMBER: LOGGING ENGINEER: OPERATOR WITNESS: SURFACE LOCATION SECTION: TOWNSHIP: RANGE: FNL: FSL: FEL: FWL: ELEVATION(FT FROM MSL O) KELLY BUSHING: DERRICK FLOOR: GROUND LEVEL: WELL CASING RECORD 1ST STRING 2ND STRING RUN 1 98421 M ORR I SON J. RAY DS2-O7A 500292015401 ARCO ALASKA, INC. SCHLUMBERGER WELL SERVICES 18-FEB-99 RUN 2 RUN 3 3709 4243 OPEN HOLE CASING DRILLERS BIT SIZE (IN) SIZE (IN) DEPTH (FT) 6. 000 7. 000 9748.0 29.67 36 llN 14E 58.77 LIS Tape ~fication Listing Schlumberger Alaska Computing Center 18-FEB-1999 17:30 3RD STRING PRODUCTION STRING REMARKS: CONTAINED HEREIN IS THE PEX/AIT/BHC DATA ACQUIRED ON ARCO ALASKA, INC. WELL DS 2-07A ON 16-JUL-98. $ $ PAGE: **** FILE HEADER **** FILE NAME : EDIT .001 SERVICE : FLIC VERSION · O01CO1 DATE : 99/02/18 MAX REC SIZE : 1024 FILE TYPE : LO LAST FILE : FILE HEADER FILENUMBER: 1 EDITED~IN PASS Ail tool strings; Depth shifted and clipped curves; all runs merged; no cased hole data. DEPTH INCREMENT: 0.5000 FILE SUMmDXRY LDWG TOOL CODE START DEPTH AIT 10710.0 CNT 10675.0 SDN 10688.0 BCS 10660.0 $ BASELINE CURVE FOR SHIFTS: GR CURVE SHIFT DATA (MEASURED DEPTH) BASELINE DEPTH 88888 0 10598 0 10592 5 10589 0 10581 0 10530 0 10524 5 10513 0 10506.5 10498 5 10485 0 10457 5 10453 5 10440 5 10435 0 10414 0 STOP DEPTH .......... 9768.0 9366.0 9768.0 9768.0 EQUIVALENT UNSHIFTED DEPTH .......... AIT CNT SDN BCS 88941.0 88941.0 88941.0 88941.0 10651.0 10651.0 10651.0 10651.0 10644.0 10644.0 10644.0 10644.0 10628.0 10628.0 10628.0 10628.0 10612.5 10612.5 10612.5 10612.5 10563.0 10563.0 10563.0 10563.0 10557.5 10557.5 10557.5 10557.5 10545.5 10545.5 10545.5 10545.5 10536.0 10536.0 10536.0 10536.0 10532.5 10532.5 10532.5 10532.5 10514.5 10514.5 10514.5 10514.5 10488.5 10488.5 10488.5 10488.5 10486.0 10486.0 10486.0 10486.0 10470.0 10470.0 10470.0 10470.0 10465.0 10465.0 10465.0 10465.0 10441.5 10441.5 10441.5 10441.5 LIS Tape ~eT~fication Listing Schlumberger Alaska Computing Center 18-FEB-1999 17:30 PAGE: 10385.5 10414.0 10414.0 10414.0 10414.0 10124.5 10147.0 10147.0 10147.0 10147.0 9641.5 9668.0 9668.0 9668.0 9668.0 9569.5 9595.0 9595.0 9595.0 9595.0 9504.5 9531.0 9531.0 9531.0 9531.0 9477.0 9502.5 9502.5 9502.5 9502.5 9454.0 9480.5 9480.5 9480.5 9480.5 9445.5 9471.5 9471.5 9471.5 9471.5 9420.0 9445.5 9445.5 9445.5 9445.5 9397.0 9423.5 9423.5 9423.5 9423.5 9376.5 9403.0 9403.0 9403.0 9403.0 9371.5 9399.0 9399.0 9399.0 9399.0 9354.5 9381.5 9381.5 9381.5 9381.5 100.0 127.0 127.0 127.0 127.0 $ MERGED DATA SOURCE LDWG TOOL CODE $ REMARKS: RUN NO. PASS NO. MERGE TOP ~IERGE BASE THIS FILE CONTAINS THE CLIPPED AND DEPTH CORRECTED DATA FOR THE MAIN PASS. THE DEPTH SHIFTS SHOWN ABOVE REFLECT THE MAIN PASS GAMMA RAY TO THE BASE G~ RAY PROVIDED BY THE CLIENT (GR.MWD). ALL OTHER AIT/CNT/SDN/BCS CURVES WERE CARRIED WITH THE GAiV~IA RAY SHIFT. $ LIS FORMAT DATA ** DATA FORMAT SPECIFICATION RECORD ** ** SET TYPE - 64EB TYPE REPR CODE VALUE 1 66 0 2 66 0 3 73 120 4 66 1 5 66 6 73 7 65 8 68 0.5 9 65 FT 11 66 8 12 68 13 66 0 14 65 FT 15 66 68 16 66 1 0 66 0 LIS Tape Vitrification Listing Schlumberger Alaska Computing Center PAGE: ** SET TYPE - CHAN** NAME SERV UNIT SERVICE API API API API FILE NUMB NUMB SIZE REPR PROCESS ID ORDER # LOG TYPE CLASS MOD NUMB SAMP ELEM CODE (HEX) O0 000 O0 0 1 1 1 4 68 0000000000 DEPT FT 1225261 SP AIT MV 1225261 GR AIT GAPI 1225261 TENS AIT LB 1225261 TEND AIT LB 1225261 MRES AIT OHI4M 1225261 MTEM AIT DEGF 1225261 DEV AIT DEG 1225261 CNTC CNT CPS 1225261 CFTC CNT CPS 1225261 FCNT CNT CPS 1225261 NCNT CNT CPS 1225261 CRAT CNT 1225261 N-RATCNT 1225261 NPHI CNT PU-S 1225261 CPHI CNT PU-S 1225261 DT BCS US/F 1225261 CALl SDN IN 1225261 DRHO SDN G/C3 1225261 PEF SDN BN/E 1225261 RHOB SDN G/C3 1225261 MSFL SDN OH~M 1225261 MINV SDN OttMM 1225261 ~fNORSDN OH~M 1225261 AFI OAIT OP~4M 1225261 AF20 AIT OH~M 1225261 AF30 AIT OH~M 1225261 AF60 AIT 0I~4~ 1225261 AF90 AIT OH~M 1225261 GR MWD GAPI 1225261 O0 000 O0 0 1 1 1 4 68 0000000000 O0 000 O0 0 1 1 1 4 68 0000000000 O0 000 O0 0 1 1 1 4 68 0000000000 O0 000 O0 0 1 1 1 4 68 0000000000 O0 000 O0 0 1 1 1 4 68 0000000000 O0 000 O0 0 1 1 1 4 68 0000000000 O0 000 O0 0 1 1 1 4 68 0000000000 O0 000 O0 0 1 1 1 4 68 0000000000 O0 000 O0 0 1 1 1 4 68 0000000000 O0 000 O0 0 1 1 1 4 68 0000000000 O0 000 O0 0 1 1 1 4 68 0000000000 O0 000 O0 0 1 1 1 4 68 0000000000 O0 000 O0 0 1 1 1 4 68 0000000000 O0 000 O0 0 1 1 1 4 68 0000000000 O0 000 O0 0 1 1 1 4 68 0000000000 O0 000 O0 0 1 1 1 4 68 0000000000 O0 000 O0 0 1 1 1 4 68 0000000000 O0 000 O0 0 1 1 1 4 68 0000000000 O0 000 O0 0 1 1 1 4 68 0000000000 O0 000 O0 0 1 1 1 4 68 0000000000 O0 000 O0 0 1 1 1 4 68 0000000000 O0 000 O0 0 1 1 1 4 68 0000000000 O0 000 O0 0 1 1 1 4 68 0000000000 O0 000 O0 0 1 1 1 4 68 0000000000 O0 000 O0 0 1 1 1 4 68 0000000000 O0 000 O0 0 1 1 1 4 68 0000000000 O0 000 O0 0 1 1 1 4 68 0000000000 O0 000 O0 0 1 1 1 4 68 0000000000 O0 000 O0 0 1 ! 1 4 68 0000000000 ** DATA ** DEPT. 12786.000 SP.AIT TEND.AIT -999.250 ~4~ES.AIT CNTC. CNT -999.250 CFTC. CNT CRAT. CNT -999.250 NRAT. CNT DT.BCS -999.250 CAL1.SDN RHOB.SDN -999.250 MSFL. SDN AFIO.AIT -999.250 AF20.AIT AF90.AIT -999.250 GR.MWD -999 250 -999 250 -999 250 -999 250 -999 250 -999 250 -999.250 31.946 DEPT. 7413.500 SP.AIT -999.250 TEND.AIT -999.250 M~ES.AIT -999.250 CNTC. CNT -999.250 CFTC. CNT -999.250 CRAT. CNT -999.250 NRAT. CNT -999.250 GR.AIT -999.250 TENS.AIT MTE~.AIT -999.250 DEV. AIT FCNT. CNT -999.250 NCNT. CNT NPHI.CNT -999.250 CPHI.CNT DRHO. SDN -999.250 PEF. SDN MINV. SDN -999.250 ~INOR.SDN AF30.AIT -999.250 AF60.AIT GR.AIT -999.250 TENS.AIT MTEM. AIT -999.250 DEV. AIT FCNT. CNT -999.250 NCNT. CNT NPHI.CNT -999.250 CPHI.CNT -999.250 -999.250 -999.250 -999.250 -999.250 -999.250 -999.250 -999.250 -999.250 -999.250 -999.250 LIS Tape ~fication Listing Schlumberger Alaska Computing Center 18-FEB-1999 17:30 PAGE: DT.BCS -999.250 CAL1.SDN RHOB.SDN -999.250 MSFL.SDN AFIO.AIT -999.250 AF20.AIT AF90.AIT -999.250 GR.MWD -999.250 DRHO.SDN -999.250 MINV. SDN -999.250 AF30.AIT 55.541 -999.250 PEF. SDN -999.250 blNOR.SDN -999.250 AF60.AIT -999.250 -999.250 -999.250 ** END OF DATA ** **** FILE TRAILER FILE NAME : EDIT .001 SERVICE : FLIC VERSION · O01CO1 DATE : 99/02/18 MAX REC SIZE : 1024 FILE TYPE : LO LAST FILE : **** FILE HEADER **** FILE NAME : EDIT .002 SERVICE : FLIC VERSION : O01CO1 DATE : 99/02/18 MAX REC SIZE : 1024 FILE TYPE : LO LAST FILE : RUN NUMBER: TOOL STRING NUMBER: PASS NUMBER: DEPTH INCREMENT: FILE SUb94ARY FILE HEADER FILE NUMBER 2 RAW MAIN PASS Curves and log header data for each run and tool string in separate files; Tool String #1 fo Sadlerochit run presented first (primary depth control string used to depth shift the Sadler interval) followed by files for other main pass tool strings per run. 1 1 1 0.1667 VENDOR TOOL CODE START DEPTH STOP DEPTH PEX 10662.0 9326.0 AIT 10662.0 9326.0 BHC 10662.0 9326.0 $ LOG HEADER DATA DATE LOGGED: SOFTWARE VERSION: TIME CIRCULATION ENDED: !6-JUL-98 8Cl -205 1500 15-JUL-98 LIS Tape Ve~fication Listing Schlumberger Alaska Computing Center PAGE: TIME LOGGER ON BOTTOM: TD DRILLER (FT) : TD LOGGER (FT) : TOP LOG INTERVAL (FT) : BOTTOM LOG INTERVAL (FT) : LOGGING SPEED (FPHR) : 900 16-JUL-98 10656.0 10714.0 9355.0 10714.0 1800.0 TOOL STRING (TOP TO BOTTOM) VENDOR TOOL CODE TOOL TYPE AMS AUX. MEAS. SONDE BHC COMP. SONIC PEX PLATFORM EXPRESS AIT ARRAY INDUCTION $ TOOL NUMBER AMS-A DSLT- TCC HILTB-DTB AIT-H 121 BOREHOLE AND CASING DATA OPEN HOLE BIT SIZE (IN): DRILLERS CASING DEPTH (FT) : LOGGERS CASING DEPTH (FT) : 6.000 9748.0 9768.0 BOREHOLE CONDITIONS MUD TYPE: QUICKDRILL MUD DENSITY (LB/G): 8.80 MUD VISCOSITY (S) : 63.0 MUD PH: 8.8 FLUID LOSS (C3): MAXIMUM RECORDED TEMPERATURE (DEGF) : RESISTIVITY (OP24M) AT TEMPERATURE (DEGF) : MUD AT MEASURED TEMPERATURE (MT): O. 170 MUD AT BOTTOM HOLE TEMPERATURE (BHT) : MUD FILTRATE AT (MT): O. 185 MUD FILTRATE AT (BHT) : MUD CAKE AT (MT): 0.115 MUD CAKE AT (BHT) : 65.0 65.0 65.0 NEUTRON TOOL TOOL TYPE (EPITHE~ OR THERMAL): THERMAL MATRIX: SANDSTONE MATRIX DENSITY: 2.65 HOLE CORRECTION (IN): TOOL STANDOFF (IN): O. 5 REMARKS: PRIMARY DEPTH FROM DRILLERS DEPTH. Standoffs on Sonic and AIT, Tool turners on Neutron. AIT run compute standoff, eccentered. Max deviation 88.5 deg. Tools run on drillpipe with TLC gear. THIS FILE CONTAINS THE RAW MAIN PASS DATA PRESENTED AT .1667' SA24PLE RATE. *NOTE: ALL DATA ACQUIRED AT .5', .25', AND .0833' SAMPLE RATES HAS BEEN CONVERTED TO .1667' SAMPLE RATE VIA LINEAR INTERPOLATION. $ LIS Tape V&~fication Listing Schlumberger Alaska Computing Center 18-FEB-1999 17:30 PAGE: LIS FORMAT DATA ** DATA FORMAT SPECIFICATION RECORD ** ** SET TYPE - 64EB ** TYPE REPR CODE VALUE 1 66 0 2 66 0 3 73 168 4 66 1 5 66 6 73 7 65 8 68 0.166 9 65 FT 11 66 6 12 68 13 66 0 14 65 FT 15 66 68 16 66 1 0 66 1 ** SET TYPE - CHAN ** NAME SERV UNIT SERVICE API API API API FILE NUMB NUMB SIZE REPR PROCESS ID ORDER # LOG TYPE CLASS MOD NUMB SAMP ELE~4 CODE (HEX) DEPT FT 1225261 O0 000 O0 0 2 1 1 4 68 0000000000 SP AIT MV 1225261 O0 000 O0 0 2 i 1 4 68 0000000000 GR AIT GAPI 1225261 O0 000 O0 0 2 1 1 4 68 0000000000 TENS AIT LB 1225261 O0 000 O0 0 2 1 1 4 68 0000000000 HTEN AIT LB 1225261 O0 000 O0 0 2 ! 1 4 68 0000000000 MRES AIT 0t1MM1225261 O0 000 O0 0 2 1 1 4 68 0000000000 MTEMAIT DEGF 1225261 O0 000 O0 0 2 1 1 4 68 0000000000 GDEV AIT DEG 1225261 O0 000 O0 0 2 1 i 4 68 0000000000 CNTC PEX CPS 1225261 O0 000 O0 0 2 i 1 4 68 0000000000 CFTC PEX CPS 1225261 O0 000 O0 0 2 i 1 4 68 0000000000 RCFT PEX CPS 1225261 O0 000 O0 0 2 i 1 4 68 0000000000 RCNT PEX CPS 1225261 O0 000 O0 0 2 1 1 4 68 0000000000 TNRA PEX 1225261 O0 000 O0 0 2 1 1 4 68 0000000000 RTNR PEX 1225261 O0 000 O0 0 2 t 1 4 68 0000000000 TNPH PEX PU 1225261 O0 000 O0 0 2 1 1 4 68 0000000000 NPHI PEX PU-S 1225261 O0 000 O0 0 2 1 1 4 68 0000000000 NPOR PEX PU 1225261 O0 000 O0 0 2 t 1 4 68 0000000000 DT BHC US~F1225261 O0 000 O0 0 2 i 1 4 68 0000000000 AFIO AIT OH~ff~1225261 O0 000 O0 0 2 1 1 4 68 0000000000 AF20 AIT 0HM~I1225261 O0 000 O0 0 2 i i 4 68 0000000000 LIS Tape V~fication Listing Schlumberger Alaska Computing Center PAGE: 8 NAME SERV UNIT SERVICE API API API API FILE NUMB NUM~ SIZE REPR PROCESS ID ORDER # LOG TYPE CLASS MOD NURiB SAMP ELEM CODE (HEX) AF30 AIT 0H~41225261 O0 000 O0 0 2 1 1 4 68 0000000000 AF60 AIT 0H~1225261 O0 000 O0 0 2 1 1 4 68 0000000000 AF90 AIT 0H~1225261 O0 000 O0 0 2 1 1 4 68 0000000000 RHOZ PEX G/C3 1225261 O0 000 O0 0 2 1 1 4 68 0000000000 HDRA PEX G/C3 1225261 O0 000 O0 0 2 1 1 4 68 0000000000 PEFZ PEX 1225261 O0 000 O0 0 2 1 1 4 68 0000000000 HMIN PEX OH~4 1225261 O0 000 O0 0 2 1 1 4 68 0000000000 HFINO PEX OH~4 1225261 O0 000 O0 0 2 1 1 4 68 0000000000 RXOZ PEX OHMM 1225261 O0 000 O0 0 2 1 1 4 68 0000000000 RX08 PEX 0H~1225261 O0 000 O0 0 2 1 1 4 68 0000000000 HCNT PEX CPS 1225261 O0 000 O0 0 2 1 1 4 68 0000000000 HCFT PEX CPS 1225261 O0 000 O0 0 2 1 1 4 68 0000000000 HGR PEX GAPI 1225261 O0 000 O0 0 2 1 1 4 68 0000000000 RHFT PEX CPS 1225261 O0 000 O0 0 2 1 1 4 68 0000000000 RHNT PEX CPS 1225261 O0 000 O0 0 2 1 1 4 68 0000000000 HTNP PEX PU 1225261 O0 000 O0 0 2 1 1 4 68 0000000000 HNPO PEX PU 1225261 O0 000 O0 0 2 1 1 4 68 0000000000 TT1 BHC US 1225261 O0 000 O0 0 2 I 1 4 68 0000000000 TT2 BHC US 1225261 O0 000 O0 0 2 1 1 4 68 0000000000 TT3 BHC US 1225261 O0 000 O0 0 2 1 1 4 68 0000000000 TT4 BHC US 1225261 O0 000 O0 0 2 1 1 4 68 0000000000 HCAL PEX IN 1225261 O0 000 O0 0 2 1 1 4 68 0000000000 ** DATA ** DEPT. HTEN. AIT 668.005 ~I~ES.AIT 0.123 MTEM.AIT 188 CNTC. PEX 3035.773 CFTC. PEX 1643.469 RCFT. PEX 1529 TNRA.PEX 1.886 RTNR.PEX 1.938 TNPH. PEX 18 NPOR.PEX 18.580 DT. BHC 71.758 AFiO.AIT 33 AF30.AIT 12.637 AF60.AIT 14.661 AF90.AIT 14 HDRA.PEX -999.250 PEFZ. PEX -999.250 H~IN. PEX 0 RXOZ.PEX 1.823 RXO8.PEX 1.824 HCNT. PEX 3035 HGR.PEX 190.909 RHFT. PEX 1529.364 RPiNT. PEX 2980 HNPO.PEX 18.580 TT1.BHC 465.625 TT2.BHC 321 TT4.BHC 313.594 HCAL.PEX 6.035 10662.000 SP.AIT 49.250 GR.AIT 190 909 TENS.AIT 2760.000 683 GDEV. AIT -999.250 364 RCNT. PEX 2980.018 857 NPHI.PEX 19.660 533 AF20.AIT 10.183 002 RHOZ.PEX -999.250 356 H~NO.PEX 0.510 773 HCFT. PEX 1643.470 018 HTNP.PEX 18.857 484 TT3.BHC 456.484 DEPT. 9326.000 SP.AIT HTEN. AIT 1210.694 MRES.AIT CNTC. PEX 1327.544 CFTC. PEX TNRA.PEX 3.842 RTNR.PEX NPOR.PEX 41.696 DT. BHC 187.415 AFiO.AIT -999 AF30.AIT -999.250 AF60.AiT -999.250 AF90.AIT -999 HDRA.PEX -999.250 PEFZ. PEX -999.250 H~IN. PEX -999 RXOZ.PEX -999.250 RXO8.PEX -999.250 HCNT. PEX -999 HGR.PEX -999.250 RHFT. PEX -999.250 RHNT. PEX -999 HNPO.PEX -999.250 TT1.BHC -999.250 TT2.BHC -999 TT4.BHC -999.250 HCAL. PEX -999.250 -59.875 GR.AIT 99.609 TENS.AIT 189.000 0.075 MTEM. AIT 156.269 GDEV. AIT 46.069 358.692 RCFT.PEX 376.809 RCNT. PEX 1319.839 3.942 TNPH. PEX 41 481 NPHI.PEX 44.474 250 AF20.AIT -999.250 250 RHOZ.PEX -999.250 250 P~4NO. PF~ -999.250 250 HCFT. PEX -999.250 250 HTNP. PEX -999.250 250 TT3.BHC -999.250 LIS Tape V~fication Listing Schlumberger Alaska Computing Center PAGE: ** END OF DATA ** **** FILE TRAILER **** FILE NAME : EDIT .002 SERVICE · FLIC VERSION · O01CO1 DATE : 99/02/18 MAX REC SIZE : 1024 FILE TYPE : LO LAST FILE : **** FILE HEADER **** FILE NAME : EDIT .003 SERVICE : FLIC VERSION : O01CO1 DATE · 99/02/18 MAX REC SIZE : 1024 FILE TYPE : LO LAST FILE : RUN NUMBER: TOOL STRING NUMBER: PASS NUMBER: DEPTH INCRE~IENT : FILE SUF~4ARY FILE HEADER FILE NUMBER 3 RAW REPEAT PASS Curves and log header data for each pass, tool string, and run in separate files. 1 1 2 0.1667 VENDOR TOOL CODE START DEPTH STOP DEPTH PEX 10662.0 10397.5 AIT 10662.0 10397.5 BHC 10662.0 10397.5 $ LOG HEADER DATA DATE LOGGED: SOFTWARE VERSION: TIME CIRCULATION ENDED TIME LOGGER ON BOTTOM: TD DRILLER (FT) : TD LOGGER (FT) : TOP LOG INTERVAL (FT) : BOTTOM LOG INTERVAL (FT) LOGGING SPEED (FPHR) : 16-JUL-98 8Cl -205 1500 15-JUL-98 900 16-JUL-98 10656.0 10714.0 9355.0 10714.0 1800.0 LIS Tape V~fication Listing Schlumberger Alaska Compu ting Center 18-FEB-1999 i~'FCJ~O PAGE: 10 TOOL STRING (TOP TO BOTTOM) VENDOR TOOL CODE TOOL TYPE AMS AUX. P~EAS. SONDE BHC COMP. SONIC PEX PLATFORM EXPRESS AIT ARRAY INDUCTION $ TOOL NUMBER DSLT-TCC HILTB-DTB AIT-H 121 BOREHOLE AND CASING DATA OPEN HOLE BIT SIZE (IN) DRILLERS CASING DEPTH (FT) LOGGERS CASING DEPTH (FT) 6.000 9748.0 9768.0 BOREHOLE CONDITIONS MUD TYPE: MUD DENSITY (LB/G): MUD VISCOSITY (S) : MUD PH: FLUID LOSS (C3): MAXIMUM RECORDED TEMPERATURE (DEGF) : RESISTIVITY (OH~ff~) AT TEMPERATURE (DEGF) : MUD AT MEASURED TEMPERATURE (MT): MUD AT BOTTOM HOLE TEMPERATURE (BHT) : MUD FILTRATE AT (MT): MUD FILTRATE AT (BHT) : MUD CAKE AT (MT): MUD CAKE AT (BHT): QUICKDRILL 8.80 63.0 8.8 O. 170 O. 185 0.115 65.0 65.0 65.0 NEUTRON TOOL TOOL TYPE (EPITHERMAL OR THERMAL): THERMAL. MA TRIX: SANDSTONE MATRIX DENSITY: 2.65 HOLE CORRECTION (IN): TOOL STANDOFF (IN): O. 5 REMARKS: PRIMARY DEPTH FROM DRILLERS DEPTH. Standoffs on Sonic and AIT, Tool turners on Neutron. AIT run compute standoff, eccentered. Max deviation 88.5 deg. Tools run on drillpipe with TLC gear. THIS FILE CONTAINS THE RAW REPEAT PASS DATA PRESENTED AT . 1667 ' SAMPLE RATE. *NOTE: ALL DATA ACQUIRED AT .5', .25', 'AND .0833' SAMPLE RATES HAS BEEN CONVERTED TO .1667' SAMPLE RATE VIA LINEAR INTERPOLATION. $ LIS FORMAT DATA LIS Tape ~fication Listing Schlumberger Alaska Computing Center 18-FEB-1999 l'~JO PAGE: 11 ** DATA FORMAT SPECIFICATION RECORD ** ** SET TYPE - 64EB ** TYPE REPR CODE VALUE 1 66 0 2 66 0 3 73 168 4 66 1 5 66 6 73 7 65 8 68 O. 166 9 65 FT 11 66 6 12 68 13 66 0 14 65 FT 15 66 68 16 66 1 0 66 1 * * SET TYPE - CHAN ** NAME SERV UNIT SERVICE API API API API FILE NUMB NUMB SIZE REPR PROCESS ID ORDER # LOG TYPE CLASS MOD NUMB SAMP ELEM CODE (HEX) DEPT FT 1225261 O0 000 O0 0 3 1 1 4 68 0000000000 SP AIT MV 1225261 O0 000 O0 0 3 ! 1 4 68 0000000000 GR AIT GAPI 1225261 O0 000 O0 0 3 1 1 4 68 0000000000 TENS AIT LB 1225261 O0 000 O0 0 3 1 1 4 68 0000000000 HTEN AIT LB 1225261 O0 000 O0 0 3 1 1 4 68 0000000000 ~4~ES AIT OHMM1225261 O0 000 O0 0 3 1 1 4 68 0000000000 MTEMAIT DEGF 1225261 O0 000 O0 0 3 1 1 4 68 0000000000 GDEVAIT DEG 1225261 O0 000 O0 0 3 1 1 4 68 0000000000 CNTC PEX CPS 1225261 O0 000 O0 0 3 1 1 4 68 0000000000 CFTC PEX CPS 1225261 O0 000 O0 0 3 1 1 4 68 0000000000 RCFT PEX CPS 1225261 O0 000 O0 0 3 1 1 4 68 0000000000 RCNT PEX CPS 1225261 O0 000 O0 0 3 1 1 4 68 0000000000 TNRA PEX 1225261 O0 000 O0 0 3 1 1 4 68 0000000000 RTNR PEX 1225261 O0 000 O0 0 3 1 1 4 68 0000000000 TNPH PEX PU 1225261 O0 000 O0 0 3 ! 1 4 68 0000000000 NPHI PEX PU-S 1225261 O0 000 O0 0 3 1 1 4 68 0000000000 NPOR PEX PU 1225261 O0 000 O0 0 3 1 1 4 68 0000000000 DT BHC US/F 1225261 O0 000 O0 0 3 ! 1 4 68 0000000000 AFiO AIT OH~4 1225261 O0 000 O0 0 3 1 1 4 68 0000000000 AF20 AIT OH~M1225261 O0 000 O0 0 3 1 1 4 68 0000000000 AF30 AIT 0H~I41225261 O0 000 O0 0 3 1 1 4 68 0000000000 AF60 AIT OHMM1225261 O0 000 O0 0 3 1 1 4 68 0000000000 AF90 AIT OHMM1225261 O0 000 O0 0 3 1 1 4 68 0000000000 RHOZ PEX G/C3 1225261 O0 000 O0 0 3 i 1 4 68 0000000000 HDRA PEX G/C3 1225261 O0 000 O0 0 3 1 1 4 68 0000000000 PEFZ PEX 1225261 O0 000 O0 0 3 1 1 4 68 0000000000 LIS Tape ~ ....fication Listing Schlumberger Alaska Computing Center 18-FEB-!999 PAGE: 12 NAME SERVUNIT SERVICE API API API API FILE NUR~ ~ SIZE REPR PROCESS ID ORDER # LOG TYPE CLASS MOD NUFiB SAMP ELE~ CODE (HEX) H~IIN PEX OH~M1225261 O0 000 O0 0 3 1 1 4 68 0000000000 H~NO PEX 0H~1~1225261 O0 000 O0 0 3 1 1 4 68 0000000000 RXOZ PEX 0H~1225261 O0 000 O0 0 3 ! 1 4 68 0000000000 RX08 PEX 0H~941225261 O0 000 O0 0 3 1 1 4 68 0000000000 HCNT PEX CPS 1225261 O0 000 O0 0 3 1 1 4 68 0000000000 HCFT PEX CPS 1225261 O0 000 O0 0 3 1 1 4 68 0000000000 HGR PEX GAPI 1225261 O0 000 O0 0 3 1 1 4 68 0000000000 RHFT PEX CPS 1225261 O0 000 O0 0 3 1 1 4 68 0000000000 RHNT PEX CPS 1225261 O0 000 O0 0 3 1 1 4 68 0000000000 HTNP PEX PU 1225261 O0 000 O0 0 3 t 1 4 68 0000000000 HNPO PEX PU 1225261 O0 000 O0 0 3 1 1 4 68 0000000000 TT1 BHC US 1225261 O0 000 O0 0 3 1 1 4 68 0000000000 TT2 BHC US 1225261 O0 000 O0 0 3 1 1 4 68 0000000000 TT3 BHC US 1225261 O0 000 O0 0 3 1 1 4 68 0000000000 TT4 BHC US 1225261 O0 000 O0 0 3 1 1 4 68 0000000000 HCAL PEX IN 1225261 O0 000 O0 0 3 1 1 4 68 0000000000 * * DA TA * * DEPT. 10662 HTEN. AIT 547 CNTC. PEX 3052 TNRA.PEX 2 NPOR.PEX 21 AF30.AIT 13 HDRA.PEX -999 RXOZ.PEX 2 HGR.PEX 201 HNPO.PEX 21 TT4.BHC 314 DEPT. 10397 HTEN. AIT 1193 CNTC. PEX 3281 TNRA. PEX 2 NPOR . PEX 27 AF30. AIT -999 HDRA. PEX - 999 RXOZ. PEX - 999 HGR. PEX - 999 HNPO. PEX - 999 TT4. BHC - 999 .000 SP.AIT 21.625 GR.AIT .835 ~IP~ES.AIT 0.114 MTE~.AIT .477 CFTC.PEX 1488.665 RCFT. PEX 090 RTNR.PEX 2.147 TNPH. PEX 625 DT. BHC 71.816 AFiO.AIT 973 AF60.AIT 13.791 AF90.AIT 250 PEFZ.PEX -999.250 H~IN. PEX 157 RXO8.PEX 2.159 HCNT. PEX 818 RHFT. PEX 1387.861 RHNT. PEX 625 TT1.BHC 467.422 TT2.BHC 375 HCAL.PEX 6.058 500 SP.AIT 38.500 GR.AIT 865 MRES.AIT 0.095 MTEM. AIT 473 CFTC.PEX 1382.382 RCFT. PEX 446 RTNR.PEX 2.578 TNPH. PEX 082 DT.BHC 89.424 AFiO.AiT 250 AF60.AIT -999.250 AF90.AIT 250 PEFZ.PEX -999.250 H~IN. PEX 250 RXO8.PEX -999.250 HCNT. PEX 250 RHFT. PEX -999.250 RHNT. PEX 250 TT1.BHC -999.250 TT2.BHC 250 HCAL.PEX -999.250 201.818 TENS.AIT 1727.000 187.843 GDEV. AIT -999.250 1387.861 RCNT. PEX 2996.257 21.924 NPHI.PEX 22 698 1950.000 AF20.AIT 10 931 14.197 RHOZ.PEX -999 250 0.372 H~iNO.PEX 0 540 3052.477 HCFT. PEX 1488 664 2996.257 HTNP. PEX 21 924 322.969 TT3.BHC 457 188 25.108 TENS.AIT 1525.000 186.542 GDEV.AIT 62.563 1274.490 RCNT. PEX 3183.906 26.989 NPHI.P'EX 28.238 -999.250 AF20.AIT -999.250 -999.250 RHOZ.PEX -999.250 -999.250 H~4NO.PEX -999.250 -999.250 HCFT.PEX -999.250 -999.250 HTNP.PEX -999.250 -999.250 TT3.BHC -999.250 ** END OF DATA ** LIS Tape V~_.mfication Listing Schlumberger Alaska Computing Center 18-FEB-1999 i-~0 PAGE 13 **** FILE TRAILER **** FILE NAME : EDIT .003 SERVICE · FLIC VERSION : O01CO1 DATE : 99/02/18 MAX REC SIZE : 1024 FILE TYPE : LO LAST FILE : **** TAPE TRAILER **** SERVICE NAME : EDIT DATE : 99/02/18 ORIGIN : FLIC TAPE NAME : 98421 CONTINUATION # '. 1 PREVIOUS TAPE : COGENT .. ARCO ALASKA, INC., DS 2-07A, PRUDHOE BAY, #50-029-20154-01 **** REEL TRAILER **** SERVICE NAME : EDIT DATE ' 99/02/18 ORIGIN : FLIC REEL NAME : 98421 CONTINUATION # : PREVIOUS REEL : COGENT : ARCO ALASKA, INC., DS 2-07A, PRUDHOE BAY, #50-029-20154-01 Sperry-Sun Drilling Services LIS Scan Utility Mon Dec 07 08:47:17 1998 Reel Header Service name ............. LISTPE Date ..................... 98/12/07 Origin ................... STS Reel Name ................ UNKNOWN Continuation Number ...... 01 Previous Reel Name ....... UNKNOWN Comments ................. STS LIS Writing Library. Scientific Technical Services Tape Header Service name ............. LISTPE Date ..................... 98/12/07 Origin ............... ' .... STS Tape Name ................ UNKNOWN Continuation Number ...... 01 Previous Tape Name ....... UNKNOWN Comments ................. STS LIS Writing Library. Scientific Technical Services Physical EOF Comment Record TAPE HEADER PRUDHOE BAY M~m/~ ~OGS WELL NAME: API NUMBER: OPERATOR: LOGGING COMPANY: TAPE CREATION DATE: JOB DATA JOB NUMBER: LOGGING ENGINEER: OPERATOR WITNESS: DEC 08 1998 . . ~.~ .... D.S. 2-07A 500292015401 ARCO ALASKA, INC. SPERRY-SUN DRILLING SERVICES 07-DEC-98 MWD RUN 2 MWD RUN 3 MWD RUN 4 AK-MM-80266 AK-MM- 80266 AK-MM-80266 E. CRIBBS E. CRIBBS E. CRIBBS R. JAYE R. JAYE R. JAYE JOB NUMBER: LOGGING ENGINEER: OPERATOR WITNESS: MWD RUN 5 AK-MM-80266 E. CRIBBS R. JAYE MWD RUN 8 AK-MM- 80266 M. WORDEN MWD RUN 9 A/<-MM-80266 M. WORDEN R. JAYE JOB NUMBER: LOGGING ENGINEER: MWD RUN 9 AK-MM- 80266 M. WORDEN MWD RUN 10 AK-MM-80266 J. SACK MWD RUN 10 · AK-MM-80266 J. SACK OPERATOR WITNESS: R. JAYE R. JAYE SURFACE LOCATION SECTION: 36 TOWNSHIP: liN RANGE: 14E FNL: 1570 FSL: FEL: FWL: 1036 ELEVATION (FT FROM MSL 0) KELLY BUSHING: .00 DERRICK FLOOR: 58.80 GROUND LEVEL: 29.60 WELL CASING RECORD R. JAYE OPEN HOLE CASING DRILLERS BIT SIZE (IN) SIZE (IN) DEPTH (FT) 1ST STRING 13.375 2736.0 2ND STRING 9.625 7445.0 3RD STRING 8.500 7.000 9745.0 PRODUCTION STRING 6.000 12805.0 REMARKS: 1. ALL DEPTHS ARE MEASURED DEPTHS (MD) UNLESS OTHERWISE NOTED. 2. MWD RUN 1 IS DIRECTIONAL ONLY AND IS NOT PRESENTED. 3. MWD RUNS 2-5 AND 8 ARE DIRECTIONAL WITH NATURAL GAMMA PROBE (NGP) UTILIZING A SCINTILLATION DETECTOR. 4. MWD RUN 4 WAS DRILLED WITHOUT GAMMA RAY DATA OWING TO TOOL FAILURE, AND MWD RUN 5 DID NOT ACQUIRE DATA OVER THIS INTERVAL ON A MEASUREMENT AFTER DRILL- ING (MAD) PASS. ONLY RUN 4 ROP DATA IS PRESENTED. 5. GAMMA DATA FROM MWD RUN 5 ENDS AT 10139' MD, 8804' TVD, THE KICKOFF POINT FOR 2-07A PB2. NO OTHER DATA FROM RUN 5 IS PRESENTED. 6. ANADRILL'S ABI WAS UTILIZED TO KICKOFF 2-07A PB2 AND LAND WELL HORIZONTALLY NO DATA IS PRESENTED IN THE ANADRILL-LOGGED INTERVAL 10139'MD, 8804'TVD TO 10456'MD, 9017'TVD - THE KICKOFF POINT OF THIS WELLBORE FROM 2-07A PB2. 7. MWD RUNS 9 AND 10 ARE DIRECTIONAL WITH DUAL GAMMA RAY (DGR) UTILIZING GEIGER-MUELLER TUBE DETECTORS AND SLIMHOLE ELECTROMAGNETIC WAVE RESISTIVITY PHASE-4 (EWR4) . 8. MAD DATA IN THE INTERVALS 10139'MD, 8967'TVD TO 11644'MD, 9011'TVD AND l1512'MD, 9013'TVD TO 12805'MD, 9005'TVD WERE OBTAINED WHILE LOGGING OUT OF THE HOLE FOLLOWING MWD RUNS 9 AND 10 RESPECTIVELY. 9. MWD RUNS 2-5,AND 8-10 REPRESENT WELL 2-07A WITH API#: 50-029-20154-01. THIS WELL REACHED A TOTAL DEPTH (TD) OF 12805'MD, 9005'T'V'D. SROP = SMOOTHED RATE OF PENETRATION WHILE DRILLING. SGRD = SMOOTHED GAMMA RAY. SGRC = SMOOTHED GAMMA RAY COMBINED. SEXP = SMOOTHED PHASE SHIFT-DERIVED RESISTIVITY (EXTRA-SHALLOW SPACING). SESP = SMOOTHED PHASE SHIFT-DERIVED RESISTIVITY (SHALLOW SPACING). SEMP = SMOOTHED PHASE SHIFT-DERIVED RESISTIVITY (MEDIUM SPACING). SEDP = SMOOTHED PHASE SHIFT-DERIVED RESISTIVITY (DEEP SPACING). SFXE = SMOOTHED FORMATION EXPOSURE TIME. SRAT = SMOOTHED TOOL SPEED WHEN NOT DRILLING. CURVES WITH THE EXTENSION "M" DENOTE MAD PASS DATA. $ File Header Service name ............. STSLIB.001 Service Sub Level Name... Version Number ........... 1.0.0 Date of Generation ....... 98/12/07 Maximum Physical Record..65535 File Type ................ LO Previous File Name ....... STSLIB.000 Comment Record FILE HEADER FILE NUMBER: 1 EDITED MERGED MWD Depth shifted and clipped curves; all bit runs merged. DEPTH INCREMENT: .5000 FILE SUMMARY PBU TOOL CODE GR ROP RPD RPM RPS RPX FET $ BASELINE CURVE FOR SHIFTS: CURVE SHIFT DATA (MEASURED DEPTH) START DEPTH 7413.5 7508 5 10385 5 10385 5 10385 5 10385 5 10416 5 BASELINE DEPTH 7413.5 7418.0 7421.5 7426.5 7427.5 7433.0 7436.0 7439.0 7442.0 7445.0 STOP DEPTH 12786.0 12830.5 12793.0 12793.0 12793.0 12793.0 12793.0 ......... EQUIVALENT UNSHIFTED DEPTH GR 7400 5 7404 5 7406 0 7407 5 7409 0 7411 0 7416 0 7418 5 7420 0 7421.0 12830.5 12806.5 $ MERGED DATA SOURCE PBU TOOL CODE BIT RUN NO MWD 2 MWD 3 MWD 4 MWD 5 MWD 8 MWD 9 MWD 10 $ REMARKS: MERGED MAIN PASS. $ MERGE TOP 7484.0 9289.0 9750.0 10119.0 10456.0 10844.0 11696.0 Data Format Specification Record Data Record Type .................. 0 Data Specification Block Type ..... 0 Logging Direction ................. Down Optical log depth units ........... Feet Data Reference Point .............. Undefined Frame Spacing ..................... 60 .lin Max frames per record ............. Undefined Absent value ...................... -999.25 Depth Units ....................... Datum Specification Block sub-type...0 MERGE BASE 9289.0 9750.0 10139.0 10139.0 10844.0 11696.0 12805.0 Name Service Order Units Size Nsam Rep DEPT FT 4 1 68 GR MWD API 4 1 68 ROP MWD FT/H 4 1 68 RPX MWD OHMM 4 1 68 RPS MWD OHMM 4 1 68 RPM MWD OHMM 4 1 68 RPD MWD OHMM 4 1 68 FET MWD HOUR 4 1 68 Code Offset Channel 0 1 4 2 8 3 12 4 16 5 20 6 24 7 28 8 Name Min Max Mean Nsam DEPT 7413.5 12830.5 10122 10835 GR 14.2926 331.365 78.405 9452 ROP 1.9762 1845.7 74.0658 10131 RPX 1.93 31.3473 10.9462 4816 RPS 3.09 68.81 13.7395 4816 RPM 3.9881 2000 15.7877 4816 RPD 5.564 2000 16.9682 4816 FET 0.3199 96.86 15.94 4749 First Reading 7413.5 7413.5 7508 5 10385 5 10385 5 10385 5 10385 5 10416 5 Last Reading 12830.5 12786 12830.5 12793 12793 12793 12793 12793 First Reading For Entire File .......... 7413.5 Last Reading For Entire File ........... 12830.5 File Trailer Service name ............. STSLIB.001 Service Sub Level Name... Version Number ........... 1.0.0 Date of Generation ....... 98/12/07 Maximum~Physical Record..65535 File Type ................ LO Next File Name ........... STSLIB.002 Physical EOF File Header Service name ............. STSLIB.002 Service Sub Level Name... Version Number ........... 1.0.0 Date of Generation ....... 98/12/07 Maximum Physical Record..65535 File Type LO Previous File Name ....... STSLIB.001 Comment Record FILE HEADER FILE NUMBER: 2 EDITED MERGED MAD Depth shifted and clipped curves; all MAD runs merged using earliest passes. DEPTH INCREMENT: FILE SUMMARY PBU TOOL CODE GR RPD RPM RPS RPX FET R_AT $ MERGED DATA SOURCE PBU TOOL CODE MWD MWD $ REMARKS: .5000 START DEPTH STOP DEPTH 10379.0 12788.0 10385.5 12794.5 10385.5 12794.5 10385.5 12794.5 10385.5 12794.5 10416.5 12794.5 10420.0 12830.5 MAD R%TN NO. MAD PASS NO. 9 10 MERGED MAD PASS. $ MERGE TOP 10355.0 11519.0 MERGE BASE 11645.0 12806.0 Data Format Specification Record Data Record Type .................. 0 Data Specification Block Type ..... 0 Logging Direction ................. Down Optical log depth units ........... Feet Data Reference Point .............. Undefined Frame Spacing ..................... 60 .liN Max frames per record ............. Undefined Absent value ...................... -999.25 Depth Units ....................... Datum Specification Block sub-type...0 Name Service Order Units Size Nsam DEPT FT 4 1 GR MAD API 4 1 RAT MAD FT/H 4 1 RPX MAD OHMM 4 1 RPS MAD OHMM 4 1 RPM MAD OHMM 4 1 RPD MAD OHMM 4 1 FET MAD HOUR 4 1 Rep Code Offset Channel 68 0 1 68 4 2 68 8 3 68 12 4 68 16 5 68 20 6 68 24 7 68 28 8 Name Min Max Mean DEPT 10379 12830.5 11604.8 GR 13.0043 219.5 58.133 RAT 69.98 14990.6 534.685 RPX 1.93 28.99 8.43069 RPS 3.09 68.81 10.8792 RPM 3.5937 2000 13.7371 RPD 4.5999 2000 15.6069 FET 3.3507 96.86 34.3911 First Last Nsam Reading Reading 4904 10379 12830.5 4802 10379 12788 4796 10420 12830.5 4819 10385.5 12794.5 4802 10385.5 12794.5 4803 10385.5 12794.5 4803 10385.5 12794.5 4568 10416.5 12794.5 First Reading For Entire File .......... 10379 Last Reading For Entire File ........... 12830.5 File Trailer Service name ............. STSLIB.002 Service Sub Level Name... Version Number ........... 1.0.0 Date of Generation ....... 98/12/07 Maximum Physical Record..65535 File Type ................ LO Next File Name ........... STSLIB.003 Physical EOF File Header Service name ............. STSLIB.003 Service Sub Level Name... Version Number ........... 1.0.0 Date of Generation ....... 98/12/07 Maximum Physical Record..65535 File Type ................ LO Previous File Name ....... STSLIB.002 Comment Record FILE HEADER FILE NUMBER: RAW MWD Curves and log header data for each bit run in separate files. BIT RLTNNUMBER: 2 DEPTH INCREMENT: .5000 FILE SUMMARY VENDOR TOOL CODE START DEPTH GR 7400.5 ROP 7484.5 $ LOG HEADER DATA DATE LOGGED: SOFTWARE SURFACE SOFTWARE VERSION: DOWN-HOLE SOFTWARE VERSION: DATA TYPE (MEMORY OR REAL-TIME): TD DRILLER (FT) : TOP LOG INTERVAL (FT) : BOTTOM LOG INTERVAL (FT): BIT ROTATING SPEED (RPM) : HOLE INCLINATION (DEG MINIMUM ANGLE: MAXIMUM ANGLE: STOP DEPTH 9224.0 9289.5 06-JU-L-98 5.07 5.46 MEMORY 9289.0 7484.0 9289.0 25.2 55.8 TOOL STRING (TOP TO BOTTOM) VENDOR TOOL CODE TOOL TYPE NGP NATURAL GAMMA PROBE $ TOOL NUMBER PCG 47 BOREHOLE AND CASING DATA OPEN HOLE BIT SIZE (IN): DRILLER' S CASING DEPTH (FT) : 8.500 8.5 BOREHOLE CONDITIONS MUD TYPE: MUD DENSITY (LB/G): MUD VISCOSITY (S) : MUD PH: MUD CHLORIDES (PPM) : FLUID LOSS (C3) : RESISTIVITY (OHMM) AT TEMPERATURE (DEGF) MUD AT MEASURED TEMPERATURE (MT): MUD AT MAX CIRCULATING TERMPERATURE: MUD FILTRATE AT MT: MUD CAKE AT MT: LSND 10.40 56.0 9.2 1500 3.4 .000 .000 .000 .000 63.3 NEUTRON TOOL MATRIX: MATRIX DENSITY: HOLE CORRECTION (IN): TOOL STANDOFF (IN): EWR FREQUENCY (HZ): .6 REMARKS: Data Format Specification Record Data Record Type .................. 0 Data Specification Block Type ...... 0 Logging Direction ................. Down Optical'log depth units ........... Feet Data Reference Point .............. Undefined Frame Spacing ..................... 60 .liN Max frames per record ............. Undefined Absent value ...................... -999.25 Depth Units ....................... Datum Specification Block sub-type...0 Name Service Order Units Size Nsam Rep Code Offset Channel DEPT FT 4 1 68 0 1 ROP MWD 2 FT/H 4 1 68 4 2 GR MWD 2 API 4 1 68 8 3 First Name Min Max Mean Nsam Reading DEPT 7400.5 9289.5 8345 3779 7400.5 ROP 7.8303 617.848 64.6674 3611 7484.5 GR 23.7208 283.812 95.3605 3648 7400.5 Last Reading 9289.5 9289.5 9224 First Reading For Entire File .......... 7400.5 Last Reading For Entire File ........... 9289.5 File Trailer Service name ............. STSLIB.003 Service Sub Level Name... Version Number ........... 1.0.0 Date of Generation ....... 98/12/07 Maximum Physical Record..65535 File Type ................ LO Next File Name ........... STSLIB.004 Physical EOF File Header Service name ............. STSLIB.004 Service Sub Level Name... Version Number ........... 1.0.0 Date of Generation ....... 98/12/07 Maximum Physical Record..65535 File Type ................ LO Previous File Name ....... STSLIB.003 Comment Record FILE HEADER FILE NUMBER: RAW MWD Curves and lo9 header data for each bit run in separate files. BIT RUN NUMBER: 3 DEPTH INCREMENT: .5000 FILE SUMMARY VENDOR TOOL CODE START DEPTH GR 9225.0 ROP 9290.0 $ LOG HEADER DATA DATE LOGGED: SOFTWARE SURFACE SOFTWARE VERSION: DOWNHOLE SOFTWARE VERSION: DATA TYPE (MEMORY OR REAL-TIME): TD DRILLER (FT) : TOP LOG INTERVAL (FT) : BOTTOM LOG INTERVAL (FT): BIT ROTATING SPEED (RPM) : HOLE INCLINATION (DEG MINIMUM ANGLE: MAXIMUM ANGLE: STOP DEPTH 9686.5 9750.5 08 -JUL- 98 5.07 5.46 MEMORY 9750.0 9289.0 9750.0 35.5 46.7 TOOL STRING (TOP TO BOTTOM) VENDOR TOOL CODE TOOL TYPE NGP NATURAL GAMMA PROBE $ TOOL NUMBER NGP SPC 178 BOREHOLE AND CASING DATA OPEN HOLE BIT SIZE (IN): DRILLER'S CASING DEPTH (FT) : 8.500 8.5 BOREHOLE CONDITIONS MUD TYPE: MUD DENSITY (LB/G) : MUD VISCOSITY (S) : MUD PH: MUD CHLORIDES (PPM) : FLUID LOSS (C3) : RESISTIVITY (OHMM) AT TEMPERATURE (DEGF) MUD AT MEASURED TEMPERATURE (MT): MUD AT MAX CIRCULATING TERMPERATURE: MUD FILTRATE AT MT: MUD CAKE AT MT: LSND 10.40 54.0 9.0 1200 3.2 .000 .000 .000 .000 65.6 NEUTRON TOOL MATRIX: MATRIX DENSITY: HOLE CORRECTION (IN): TOOL STANDOFF (IN) : EWR FREQUENCY (HZ) : .6 REMARKS: Data Format Specification Record Data Record Type .................. 0 Data Specification Block Type ..... 0 Logging Direction .................. Down Optical log depth units ........... Feet Data Reference Point .............. Undefined Frame Spacing ..................... 60 .liN Max frames per record ............. Undefined Absent value ...................... -999.25 Depth Units ....................... Datum Specification Block sub-type...0 Name Service Order Units Size Nsam Rep Code Offset Channel DEPT FT 4 1 68 0 1 ROP MWD 3 FT/H 4 1 68 4 2 GR MWD 3 API 4 1 68 8 3 First Name Min Max Mean Nsam Reading DEPT 9225 9750.5 9487.75 1052 9225 ROP 8.0754 406.038 54.6011 922 9290 GR 46.1497 331.365 120.426 924 9225 Last Reading 9750.5 9750.5 9686.5 First Reading For Entire File .......... 9225 Last Reading For Entire File ........... 9750.5 File Trailer Service name ............. STSLIB.004 Service Sub Level Name... Version Number ........... 1.0.0 Date of Generation ....... 98/12/07 Maximum Physical Record..65535 File Type ................ LO Next File Name ........... STSLIB.005 Physical EOF File Header Service name ............. STSLIB.005 Service Sub Level Name... Version Number ........... 1.0.0 Date of Generation ....... 98/12/07 Maximum Physical Record..65535 File Type ................ LO Previous File Name ....... STSLIB.004 Comment Record FILE HEADER FILE NUMBER: 5 RAW MWD Curves and log header data for each bit run in separate files. BIT RUN NUMBER: 4 DEPTH INCREMENT: .5000 FILE SUMMARY VENDOR TOOL CODE START DEPTH ROP 9755.0 $ LOG HEADER DATA DATE LOGGED: SOFTWARE SURFACE SOFTWARE VERSION: DOWNHOLE SOFTWARE VERSION: DATA TYPE (MEMORY OR REAL-TIME): TD DRILLER (FT) : TOP LOG INTERV~LL (FT) : BOTTOM LOG INTERVAL (FT) : BIT ROTATING SPEED (RPM): HOLE INCLINATION (DEG MINIMUM ANGLE: MAXIMUM ANGLE: STOP DEPTH 10139.0 TOOL STRING (TOP TO BOTTOM) VENDOR TOOL CODE TOOL TYPE NGP NATURAL GAMMA PROBE $ BOREHOLE AND CASING DATA OPEN HOLE BIT SIZE (IN): DRILLER' S CASING DEPTH (FT) : BOREHOLE CONDITIONS MUD TYPE: MUD DENSITY (LB/G): MUD VISCOSITY (S) : MUD PH: MUD CHLORIDES (PPM): FLUID LOSS (C3) : RESISTIVITY (OHMM) AT TEMPERATURE (DEGF) MUD AT MEASURED TEMPERATURE (MT): MUD AT MAX CIRCULATING TERMPERATURE: MUD FILTRATE AT MT: MUD CAKE AT MT: NEUTRON TOOL MATRIX: MATRIX DENSITY: HOLE CORRECTION (IN): TOOL STANDOFF (IN) : EWR FREQUENCY (HZ) : REMARKS: $ Data Format Specification Record Data Record Type .................. 0 il-JUL-98 5.07 5.46 MEMORY 10160.~0 9750.0 10160.0 19.6 33.7 TOOL NUMBER NGP SPC 178 6.000 6.0 QUIK DRILN 8.60 61.0 9.0 19000 8.0 .000 .000 .000 .000 53.9 .6 Data Specification Block Type ..... 0 Logging Direction ................. Down Optical log depth units ........... Feet Data Reference Point .............. Undefined Frame Spacing ..................... 60 .liN Max frames per record ............. Undefined Absent value ...................... -999.25 Depth Units ....................... Datum Specification Block sub-type...0 Name Service Order Units Size Nsam Rep Code Offset Channel DEPT FT 4 1 68 0 1 ROP MWD 4 FT/H 4 1 68 4 2 First Name Min Max Mean Nsam Reading DEPT 9755 10139 9947 769 9755 ROP 4.5712 839.904 112.508 769 9755 Last Reading 10139 10139 First Reading For Entire File .......... 9755 Last Reading For Entire File ........... 10139 File Trailer Service name ............. STSLIB.005 Service Sub Level Name... Version Number ........... 1.0.0 Date of Generation ....... 98/12/07 Maximum Physical Record..65535 File Type ................ LO Next File Name ........... STSLIB.006 Physical EOF File Header Service name ............. STSLIB.006 Service Sub Level Name... Version Number ........... 1.0.0 Date of Generation ....... 98/12/07 Maximum Physical Record..65535 File Type ................ LO Previous File Name ....... STSLIB.005 Comment Record FILE HEADER FILE NUMBER: 6 RAW MWD Curves and log header data for each bit run in separate files. BIT RUN NUMBER: 5 DEPTH INCREMENT: .5000 FILE SUMMARY VENDOR TOOL CODE START DEPTH GR 10118.5 $ LOG HEADER DATA DATE LOGGED: SOFTWARE SURFACE SOFTWARE VERSION: DOWN-HOLE SOFTWARE VERSION: DATA TYPE (MEMORY OR REAL-TIME): TD DRILLER (FT) : TOP LOG INTERVAL (FT) : BOTTOM LOG INTERVAL (FT) : BIT ROTATING SPEED (RPM) : HOLE INCLINATION (DEG MINIMUM ANGLE: MAXIMUM ANGLE: TOOL STRING (TOP TO BOTTOM) VENDOR TOOL CODE TOOL TYPE NGP NATURAL GAMMA PROBE $ BOREHOLE AND CASING DATA OPEN HOLE BIT SIZE (IN): DRILLER' S CASING DEPTH (FT) : BOREHOLE CONDITIONS MUD TYPE: MUD DENSITY (LB/G): MUD VISCOSITY (S) : MUD PH: MUD CHLORIDES (PPM) : FLUID LOSS (C3) : RESISTIVITY (OHMM) AT TEMPERATURE (DEGF) MUD AT MEASURED TEMPERATURE (MT): MUD AT MAX CIRCULATING TERMPERATURE: MUD FILTRATE AT MT: MUD CAKE AT MT: NEUTRON TOOL MATRIX: MATRIX DENSITY: HOLE CORRECTION (IN): TOOL STA/qDOFF (IN) : EWR FREQUENCY (HZ): REMARKS: $ Data Format Specification Record Data Record Type .................. 0 Data Specification Block Type ..... 0 Logging Direction ................. Down Optical log depth units ........... Feet Data Reference Point .............. Undefined STOP DEPTH 10139.0 12 - JLTL- 98 5.07 5.46 MEMORY 10493.0 10160.0 10493.0 33.4 57.7 TOOLNUMBER PCG 47 6.000 6.0 QUIK DRILN 8.60 63.0 8.8 19000 7.8 .000 .000 .000 .000 53.9 .6 Frame Spacing ..................... 60 .liN Max frames per record ............. Undefined Absent value ...................... -999.25 Depth Units ........................ Datum Specification Block sub-type...0 Name Service Order Units Size Nsam Rep Code Offset Channel DEPT FT 4 1 68 0 1 GR MWD 5 API 4 1 68 4 2 First Name Min Max Mean Nsam Reading DEPT 10118.5 10139 10128.8 42 10118.5 GR 18.0331 71.1303 24.3974 42 10118.5 Last Reading 10139 10139 First Reading For Entire File .......... 10118.5 Last Reading For Entire File ........... 10139 File Trailer Service name ............. STSLIB.006 Service Sub Level Name... Version Number ........... 1.0.0 Date of Generation ....... 98/12/07 Maximum Physical Record..65535 File Type ................ LO Next File Name ........... STSLIB.007 Physical EOF File Header Service name ............. STSLIB.007 Service Sub Level Name... Version Number ........... 1.0.0 Date of Generation ....... 98/12/07 Maximum Physical Record..65535 File Type ................ LO Previous File Name ....... STSLIB.006 Comment Record FILE HEADER FILE NUMBER: 7 RAW MWD Curves and log header data for each bit run in separate files. BIT RUN NUMBER: 8 DEPTH INCREMENT: .5000 FILE SUMMARY VENDOR TOOL CODE START DEPTH STOP DEPTH GR 10456.0 10790.5 ROP 10456.5 10844.0 $ LOG HEADER DATA DATE LOGGED: SOFTWARE SURFACE SOFTWARE VERSION: DOWNHOLE SOFTWARE VERSION: DATA TYPE (MEMORY OR REAL-TIME): TD DRILLER (FT) : TOP LOG INTERVAL (FT) : BOTTOM LOG INTERVAL (FT): BIT ROTATING SPEED (RPM): HOLE INCLINATION (DEG MINIMUM ANGLE: MAXIMUM ANGLE: TOOL STRING (TOP TO BOTTOM) VENDOR TOOL CODE TOOL TYPE NGP NATURAL GAMMA PROBE $ BOREHOLE AND CASING DATA OPEN HOLE BIT SIZE (IN): DRILLER' S CASING DEPTH (FT) : BOREHOLE CONDITIONS MUD TYPE: MUD DENSITY (LB/G) : MUD VISCOSITY (S) : MUD PH: MUD CHLORIDES (PPM) : FLUID LOSS (C3) : RESISTIVITY (OHMM) AT TEMPERATURE (DEGF) MUD AT MEASURED TEMPERATURE (MT): MUD AT MAX CIRCULATING TERMPERATURE: MUD FILTRATE AT MT: MUD CAKE AT MT: NEUTRON TOOL MATRIX: MATRIX DENSITY: HOLE CORRECTION (IN): TOOL STANDOFF (IN) : EWR FREQUENCY (HZ) : REMARKS: $ Data Format Specification Record Data Record Type .................. 0 Data Specification Block Type ..... 0 Logging Direction ................. Down Optical log depth units ........... Feet Data Reference Point .............. Undefined Frame Spacing ..................... 60 .lin Max frames per record ............. Undefined Absent value ...................... -999.25 23 -JUL- 98 5.07 5.46 MEMORY 10844.0 10456.0 10844.0 61.5 99.8 TOOL NUMBER PCG 9 6.000 6.0 QUIK DRILN 8.70 71.0 9.9 19500 4.8 .000 .000 .000 .000 61.1 .0 Depth Units ....................... Datum Specification Block sub-type...0 Name Service Order Units Size Nsam Rep Code Offset Channel DEPT FT 4 1 68 0 1 GR MWD 8' kPI 4 1 68 4 2 ROP MWD 8 FT/H 4 1 68 8 3 First Name Min Max Mean Nsam Reading DEPT 10456 10844 10650 777 10456 GR 18.75 235.598 49.8586 670 10456 ROP 1.9762 919.336 93.5233 776 10456.5 Last Reading 10844 10790.5 10844 First Reading For Entire File .......... 10456 Last Reading For Entire File ........... 10844 File Trailer Service name ............. STSLIB.007 Service Sub Level Name... Version Number ........... 1.0.0 Date of Generation ....... 98/12/07 Maximum Physical Record..65535 File Type ................ LO Next File Name ........... STSLIB.008 Physical EOF File Header Service name ............. STSLIB.008 Service Sub Level Name... Version Number ........... 1.0.0 Date of Generation ....... 98/12/07 Maximum Physical Record..65535 File Type ................ LO Previous File Name ....... STSLIB.007 Comment Record FILE HEADER FILE N-UMBER: 8 RAW MWD Curves and log header data for each bit run in separate files. BIT RUN NUMBER: 9 DEPTH INCREMENT: .5000 FILE SUMMARY VENDOR TOOL CODE START DEPTH FET 10791.0 RPD 10791.0 RPM 10791.0 RPS 10791.0 STOP DEPTH 11660.0 11660.0 11660.0 11660.0 RPX 10791.0 GR 10791.0 ROP 10844.5 $ LOG HEADER'DATA DATE LOGGED: SOFTWARE SURFACE SOFTWARE VERSION: DOWN-HOLE SOFTWARE VERSION: DATA TYPE (MEMORY OR REAL-TIME): TD DRILLER (FT) : TOP LOG INTERVAL (FT) : BOTTOM LOG INTERVAL (FT): BIT ROTATING SPEED (RPM) : HOLE INCLINATION (DEG MINIMUM ANGLE: MAXIMUM ANGLE: TOOL STRING (TOP TO BOTTOM) VENDOR TOOL CODE TOOL TYPE DGR DUAL GAMMA RAY EWR4 $ 11660.0 11653.0 11691.5 ELECTROMAG. RESIS. 4 BOREHOLE AND CASING DATA OPEN HOLE BIT SIZE (IN): DRILLER' S CASING DEPTH (FT) : BOREHOLE CONDITIONS MUD TYPE: MUD DENSITY (LB/G) : MUD VISCOSITY (S): MUD PH: MUD CHLORIDES (PPM) : FLUID LOSS (C3) : RESISTIVITY (OHMM) AT TEMPERATURE (DEGF) MUD AT MEASURED TEMPERATURE (MT): MUD AT MAX CIRCULATING TERMPERATURE: MUD FILTRATE AT MT: MUD CAKE AT MT: NEUTRON TOOL MATRIX: MATRIX DENSITY: HOLE CORRECTION (IN): TOOL STANDOFF (IN): EWR FREQUENCY (HZ) : REMARKS: $ Data Format Specification Record Data Record Type .................. 0 Data Specification Block Type ..... 0 Logging Direction ................. Down 26-JUL-98 5.07 5.46 MEMORY 11696.0 10844.0 11696.0 85.7 95.4 TOOL NUMBER P1047GR4 P1047GR4 6.000 6.0 QUIK DRILN 8.70 65.0 8.9 19500 5.0 3.200 .000 2.000 4.000 71.1 .0 Optical log depth units ........... Feet Data Reference Point .............. Undefined Frame Spacing ..................... 60 .liN Max frames per record .............. Undefined Absent value ...................... -999.25 Depth units ....................... Datum Specification Block sub-type...0 DEPT GR RPX RPS RPM RPD ROP FET Name Service Order Units Size Nsam Rep FT 4 1 68 MWD 9 API 4 1 68 MWD 9 OHMM 4 1 68 MWD 9 OHMM 4 1 68 MWD 9 OHMM 4 1 68 MWD 9 OHMM 4 1 68 MWD 9 FT/H 4 1 68 MWD 9 HOUR 4 1 68 Code Offset Channel 0 1 4 2 8 3 12 4 16 5 20 6 24 7 28 8 Name Min Max Mean Nsam DEPT 10791 11691.5 11241.2 1802 GR 22.9107 167.452 93.5385 1725 RPX 5.47 27.9 10.8933 1739 RPS 6.76 30.75 12.8487 1739 RPM 7.63 31.36 13.7406 1739 RPD 8.63 31.77 14.7715 1739 ROP 3.6 549.14 41.482 1695 FET 0.68 18.515 2.86474 1739 First Reading 10791 10791 10791 10791 10791 10791 10844.5 10791 Last Reading 11691.5 11653 11660 11660 11660 11660 11691.5 11660 First Reading For Entire File .......... 10791 Last Reading For Entire File ........... 11691.5 File Trailer Service name ............. STSLIB.008 Service Sub Level Name... Version Number ........... 1.0.0 Date of Generation ....... 98/12/07 Maximum Physical Record..65535 File Type ................ LO Next File Name ........... STSLIB.009 Physical EOF File Header Service name ............. STSLIB.009 Service Sub Level Name... Version Number ........... 1.0.0 Date of Generation ....... 98/12/07 Maximum Physical Record..65535 File Type ................ LO Previous File Name ....... STSLIB.008 Comment Record FILE HEADER FILE NUMBER: 9 RAW MWD Curves and log header data for each bit run in separate files. BIT RUN NUMBER: 10 DEPTH INCREMENT: .5000 FILE SUMMARY VENDOR TOOL CODE START DEPTH STOP DEPTH GR 11654.0 12762.0 FET 11661.0 12769.0 RPD 11661.0 12769.0 RPM 11661.0 12769.0 RPS 11661.0 12769.0 RPX 11661.0 12769.0 ROP 11699.0 12806.5 $ LOG HEADER DATA DATE LOGGED: SOFTWARE SURFACE SOFTWARE VERSION: DOWN-HOLE SOFTWARE VERSION: DATA TYPE (MEMORY OR REAL-TIME): TD DRILLER (FT) : TOP LOG INTERVAL (FT) : BOTTOM LOG INTERVAL (FT) : BIT ROTATING SPEED (RPM) : HOLE INCLINATION (DEG MINIMUM ANGLE: MAXIMUM ANGLE: 29-~TJL- 98 5.07 5.46 MEMORY 12805.0 11696,0 12805,0 87.8 92.7 TOOL STRING (TOP TO BOTTOM) VENDOR TOOL CODE TOOL TYPE DGR DUAL GAMMA RAY EWR4 ELECTROMAG. RESIS. 4 TOOL N-UMBER P1047GR4 P1047GR4 BOREHOLE AND CASING DATA OPEN HOLE BIT SIZE (IN): DRILLER' S CASING DEPTH (FT) : 6.000 6,0 BOREHOLE CONDITIONS MUD TYPE: MUD DENSITY (LB/G): MUD VISCOSITY (S) : MUD PH: MUD CHLORIDES (PPM) : FLUID LOSS (C3) : RESISTIVITY (OHMM) AT TEMPERATURE (DEGF) MUD AT MEASURED TEMPERATURE (MT): MUD AT MAX CIRCULATING TERMPERATURE: MUD FILTRATE AT MT: MUD CAKE AT MT: QUIK DRILN 8.70 65.0 8.5 19000 5.0 .200 .092 .180 .240 65.6 NEUTRON TOOL MATRIX: MATRIX DENSITY: HOLE CORRECTION (IN): TOOL STANDOFF (IN) : EWR FREQUENCY (HZ) : REMARKS: $ Data Format Specification Record Data Record Type .................. 0 Data Specification Block Type ..... 0 Logging Direction ................. Down Optical log depth units ........... Feet Data Reference Point .............. Undefined Frame Spacing ..................... 60 .liN Max frames per record ............. Undefined Absent value ...................... -999.25 Depth Units ....................... Datum Specification Block sub-type...0 .0 Name Service Order Units Size Nsam Rep DEPT FT 4 1 68 GR MWD 10 API 4 1 68 RPX MWD 10 OHMM 4 1 68 RPS MWD 10 OHMM 4 1 68 RPM MWD 10 OHMM 4 1 68 RPD MWD 10 OHMM 4 1 68 ROP MWD 10 FT/H 4 1 68 FET MWD 10 HOUR 4 1 68 Code Offset Channel 0 1 4 2 8 3 12 4 16 5 20 6 24 7 28 8 Name Min Max Mean Nsam DEPT 11654 12806.5 12230.2 2306 GR 14.2926 167.022 34.6786 2200 RPX 3.8011 31.3473 12.7784 2217 RPS 4.7402 37.3998 16.5019 2217 RPM 5.6147 39.1747 17.6921 2217 RPD 6.3568 36.0523 18.6061 2217 ROP 4.9799 1845.7 77.2585 2216 FET 0.3199 42.7144 2.45697 2217 First Reading 11654 11654 11661 11661 11661 11661 11699 11661 Last Reading 12806.5 12762 12769 12769 12769 12769 12806.5 12769 First Reading For Entire File .......... 11654 Last Reading For Entire File ........... 12806.5 File Trailer Service name ............. STSLIB.009 Service Sub Level Name... Version Number ........... 1.0.0 Date of Generation ....... 98/12/07 Maximum Physical Record..65535 File Type ................ LO Next File Name ........... STSLIB.010 Physical EOF File Header Service name ............. STSLIB.010 Service Sub Level Name... Version Number ........... 1.0.0 Date of Generation ....... 98/12/07 Maximum Physical Record..65535 File Type ................ LO Previous File Name ....... STSLIB.009 Comment Record FILE HEADER FILE NUMBER: 10 RAW MAD Curves and log header data for each pass of each run in separate files. DEPTH INCREMENT: .5000 MAD RUN NLIMBER: 9 MAD PASS NUMBER: FILE SUMMARY VENDOR TOOL CODE START DEPTH STOP DEPTH GR 10355.0 11599.5 RPD 10361.5 11607.5 RPM 10361.5 11607.5 RPS 10361.5 11607.5 RPX 10361.5 11607.5 FET 10392.5 11607.5 RAT 10396.0 11645.0 $ LOG HEADER DATA DATE LOGGED: SOFTWARE SURFACE SOFTWARE VERSION: DOWNHOLE SOFTWARE VERSION: DATA TYPE (MEMORY OR REAL-TIME): TD DRILLER (FT) : TOP LOG INTERVAL (FT) : BOTTOM LOG INTERVAL (FT) : BIT ROTATING SPEED (RPM) : HOLE INCLINATION (DEG MINIMUM ANGLE: MAXIMUM ANGLE: TOOL STRING (TOP TO BOTTOM) VENDOR TOOL CODE TOOL TYPE DGR DUAL GAMMA RAY EWR4 ELECTROMAG. RESIS. 4 $ BOREHOLE AND CASING DATA 26-JUL-98 5.07 5.46 MEMORY 11696.0 10844.0 11696.0 85.7 95.4 TOOL NUMBER P1047GR4 P1047GR4 OPEN HOLE BIT SIZE (IN): DRILLER'S CASING DEPTH (FT) : BOREHOLE CONDITIONS MUD TYPE: MUD DENSITY (LB/G): MUD VISCOSITY (S): MUD PH: MUD CHLORIDES (PPM) : FLUID LOSS (C3): RESISTIVITY (OHMM) AT TEMPERATURE (DEGF) MUD AT MEASURED TEMPERATURE (MT): MUD AT MAX CIRCULATING TERMPERATURE: MUD FILTRATE AT MT: MUD CAKE AT MT: NEUTRON TOOL MATRIX: MATRIX DENSITY: HOLE CORRECTION (IN): TOOL STANDOFF (IN): EWR FREQUENCY (HZ): REMARKS: $ Data Format Specification Record Data Record Type .................. 0 Data Specification Block Type ..... 0 Logging Direction ................. Down Optical log depth units ........... Feet Data Reference Point .............. Undefined Frame Spacing ..................... 60 .lin Max frames per record ............. Undefined Absent value ...................... -999.25 Depth Units ....................... Datum Specification Block sub-type...0 Name Service Order Units Size Nsam Rep DEPT FT 4 1 68 GR MAD 9 API 4 1 68 RPX MAD 9 OHMM 4 1 68 RPS MAD 9 OHMM 4 1 68 RPM MAD 9 OHMM 4 1 68 RPD MAD 9 OHMM 4 1 68 RAT MAD 9 FT/H 4 1 68 FET MAD 9 HOUR 4 1 68 6.000 6.0 QUIK DRILN 8.70 65.0 8.9 19500 5.0 3.200 .000 2.000 4.000 .0 Code Offset Channel 0 1 4 2 8 3 12 4 16 5 20 6 24 7 28 8 71.1 Name Min Max Mean DEPT 10355 11645 11000 GR 15.2 219.5 79.5291 RPX 1.93 28.99 8.45377 RPS 3.09 68.81 10.4918 First Last Nsam Reading Reading 2581 10355 11645 2490 10355 11599.5 2493 10361.5 11607.5 2493 10361.5 11607.5 RPM 3.99 2000 13.5078 RPD 5.56 2000 15.0258 ~AT 69.98 1030.08 507.717 FET 6.41 96.86 44.5201 2493 2493 2499 2431 10361.5 10361.5 10396 10392.5 11607.5 11607.5 11645 11607.5 First Reading For Entire File .......... 10355 Last Reading For Entire File ........... 11645 File Trailer Service name ............. STSLIB.010 Service Sub Level Name... Version Number ........... 1.0.0 Date of Generation ....... 98/12/07 Maximum Physical Record..65535 File Type ................ LO Next File Name ........... STSLIB.011 Physical EOF File Header Service name ............. STSLIB.011 Service Sub Level Name... Version Number ........... 1.0.0 Date of Generation ....... 98/12/07 Maximum Physical Record..65535 File Type ................ LO Previous File Name ....... STSLIB.010 Comment Record FILE HEADER FILE NUMBER: 11 RAW MAD Curves and log header data for each pass of each run in separate files. DEPTH INCREMENT: .5000 MAD RUN NUMBER: 10 MAD PASS NUMBER: FILE SUMMARY VENDOR TOOL CODE START DEPTH STOP DEPTH GR 11519.0 12764 . 0 RPD 11521.0 12770.5 RPM 11521.0 12770.5 RPS 11521.0 12770.5 RPX 11521.0 12770.5 RAT 11554.0 12806.5 FET 11694 . 5 12770 . 5 $ LOG HEADER DATA DATE LOGGED: 29 - JUL- 98 SOFTWARE SURFACE SOFTWARE VERSION: 5.07 DOWNHOLE SOFTWARE VERSION: 5.46 DATA TYPE (MEMORY OR REAL-TIME): TD DRILLER (FT) : TOP LOG INTERVAL (FT) : BOTTOM LOG INTERVAL (FT) : BIT ROTATING SPEED (RPM) : HOLE INCLINATION (DEG MINIMUM ANGLE: MAXIMUM ANGLE: TOOL STRING (TOP TO BOTTOM) VENDOR TOOL CODE TOOL TYPE DGR DUAL GAMMA RAY EWR4 ELECTROMAG. RESIS. 4 $ BOREHOLE AND CASING DATA OPEN HOLE BIT SIZE (IN): DRILLER' S CASING DEPTH (FT) : BOREHOLE CONDITIONS MUD TYPE: MUD DENSITY (LB/G) : MUD VISCOSITY (S) : MUD PH: MUD CHLORIDES (PPM) : FLUID LOSS (C3): RESISTIVITY (OHMM) AT TEMPERATURE (DEGF) MUD AT MEASURED TEMPERATURE (MT): MUD AT MAX CIRCULATING TERMPERATURE: MUD FILTRATE AT MT: MUD CAKE AT MT: NEUTRON TOOL MATRIX: MATRIX DENSITY: HOLE CORRECTION (IN): TOOL STANDOFF (IN) : EWR FREQUENCY (HZ) : REMARKS: $ Data Format Specification Record Data Record Type .................. 0 Data Specification Block Type ..... 0 Logging Direction ................. Down Optical log depth units ........... Feet Data Reference Point .............. Undefined Frame Spacing ..................... 60 .lin Max frames per record ............. Undefined Absent value ...................... -999.25 Depth Units ....................... Datum Specification Block sub-type...0 MEMORY 12805.0 11696.0 12805.0 87.8 92.7 TOOL NUMBER P1047GR4 P1047GR4 6.000 6.0 QUIK DRILN 8.70 65.0 8.5 19000 5.0 .200 · 092 .180 .240 65.6 .0 Name Service Order Units Size Nsam Rep Code Offset Channel DEPT FT 4 1 68 0 1 GR MAD 10 API 4 1 68 RPX MAD 10 OHMM 4 1 68 RPS MAD 10 OHMM 4 1 68 RPM MAD 10 OHMM 4 1 68 RPD MAD 10 OHMM 4 1 68 RAT MAD 10 FT/H 4 1 68 FET MAD 10 HOUR 4 1 68 4 2 8 3 12 4 16 5 20 6 24 7 28 8 Name Min Max Mean Nsam DEPT 11519 12806.5 12162.8 2576 GR 13.0043 133.863 35.4733 2474 RPX 3.1689 22.6401 8.57774 2500 RPS 3.5306 30.8398 11.5844 2483 RPM 3.5937 39.7939 14.3632 2484 RPD 4.5999 36.8966 16.6282 2484 RAT 72.4313 14990.6 557.995 2480 FET 3.3507 40.'6804 22.8687 2137 First Last Reading Reading 11519 12806.5 11519 12764 11521 12770.5 11521 12770.5 11521 12770.5 11521 12770.5 11554 12806.5 11694.5 12770.5 First Reading For Entire File .......... 11519 Last Reading For Entire File ........... 12806.5 File Trailer Service name ............. STSLIB.011 Service Sub Level Name... Version Number ........... 1.0.0 Date of Generation ....... 98/12/07 Maximum Physical Record..65535 File Type ................ LO Next File Name ........... STSLIB.012 Physical EOF Tape Trailer Service name ............. LISTPE Date ..................... 98/12/07 Origin ................... STS Tape Name ................ UNKNOWN Continuation Number ...... 01 Next Tape Name ........... UNKNOWN Comments ................. STS LIS Writing Library. Services Reel Trailer Service name ............. LISTPE Date ..................... 98/12/07 Origin ................... STS Reel Name ................ UNKNOWN Continuation Number ...... 01 Next Reel Name ........... UNKNOWN Comments ................. STS LIS Writing Library. Scientific Technical Scientific Technical Services Physical EOF Physical EOF End Of LIS File Sperry-Sun Drilling Services LIS Scan Utility Wed Nov 25 09:20:12 1998 Reel Header Service name ............. LISTPE Date ..................... 98/11/25 Origin ................... STS Reel Name ................ UNKNOWN Continuation Number ...... 01 Previous Reel Name ....... UNKNOWN Comments ................. STS LIS Writing Library. Services Tape Header Service name ............. LISTPE Date ..................... 98/11/25 Origin ............... ' .... STS Tape Name ................ UNKNOWN Continuation Number ...... 01 Previous Tape Name ....... UNKNOWN Comments ................. STS LIS Writing Library. Services Scientific Technical Scientific Technical Physical EOF Comment Record TAPE HEADER PRUDHOE BAY r~n/~ LOGS WELL NAME: API NUMBER: OPERATOR: LOGGING COMPANY: TAPE CREATION DATE: JOB DATA JOB NUMBER: LOGGING ENGINEER: OPERATOR WITNESS: MWD RUN 2 AK-MM- 80266 E. CRIBBS R. JAYE D[C08 D.S. 2 - 07A PB1 ~. ~ 500292015470 ~CO ~~, INC. SPERRY-S~ DRI~IN~ SERVICES 2 ~ -NOV- 9 8 MWD RUN 3 MWD RUN 4 AK-MM-80266 AK-MM- 80266 E. CRIBBS E. CRIBBS R. JAYE R. JAYE JOB NUMBER: LOGGING ENGINEER: OPERATOR WITNESS: SURFACE LOCATION SECTION: TOWNSHIP: RANGE: MWD RUN 5 AK-MM-80266 E. CRIBBS R. JAYE 36 lin 14E FNL: 1570 FSL: FEL: FWL: 1036 ELEVATION (FT FROM MSL 0) KELLY BUSHING: .00 DERRICK FLOOR: 58.80 GROUND LEVEL: 29.60 WELL CASING RECORD OPEN HOLE CASING DRILLERS BIT SIZE (IN) SIZE (IN) DEPTH (FT) 1ST STRING 13.375 2736.0 2ND STRING 9.625 7445.0 3RD STRING 8.500 7.000 9745.0 PRODUCTION STRING 6.000 10493.0 REMARKS: 1. ALL DEPTHS ARE MEASURED DEPTHS (MD) UNLESS OTHERWISE NOTED. 2. MWD RUN 1 IS DIRECTIONAL ONLY AND IS NOT PRESENTED. 3. MWD RUNS 2, 3, 4 AND 5 ARE DIRECTIONAL WITH NATURAL GAMMA PROBE (NGP) UTILIZING A SCINTILLATION DETECTOR. 4. MWD RUN 4 WAS DRILLED WITHOUT GAMMA DATA OWING TO TOOL FAILURE, AND MWD RUN 5 DID NOT ACQUIRE DATA OVER THIS INTERVAL ON A MEASUREMENT AFTER DRILLING (MAD) PASS. 5. OWING TO ERRONEOUS PIPE STRAP AND CORRELATION OF MWD DATA TO WIRELINE DATA AT THE CASING SHOE, MWD RUNS 4 AND 5 ARE SHIFTED DOWNWARD 12'. ORIGINAL FILED LOG DATA WAS NOT SHIFTED BECAUSE WIRELINE LOGGING OCCURRED AFTERWARD. 6. MWD RUNS 2-5 REPRESENT WELL D.S. 2-07A PB1 WITH API# 50-029-20154-70. THIS WELL REACHED A [CORRECTED] TOTAL DEPTH (TD) OF 10505'MD, 9055'TVD. SROP = SMOOTHED RATE OF PENETRATION WHILE DRILLING. SGRD = SMOOTHED GAMMA RAY. $ File Header Service name ............. STSLIB.001 Service Sub Level Name... Version Number ........... 1.0.0 Date of Generation ....... 98/11/25 Maximum Physical Record..65535 File Type ................ LO Previous File Name ....... STSLIB.000 Comment Record FILE HEADER FILE NUMBER: 1 EDITED MERGED MWD Depth shifted and clipped curves; all bit runs merged. DEPTH INCREMENT: .5000 FILE SUMMARY PBU TOOL CODE START DEPTH GR 7413.5 ROP 7508.5 $ BASELINE CURVE FOR SHIFTS: CURVE SHIFT DATA (MEASURED DEPTH) BASELINE DEPTH 7413 5 7418 0 7421 5 7426 5 7427 5 7433 0 7436 0 7439 0 7442 0 7445.0 10529.0 $ MERGED DATA SOURCE PBU TOOL CODE $ REMARKS: GR 7400.5 7404.5 7406.0 7407.5 7409.0 7411.0 7416.0 7418.5 7420.0 7421.0 10505.0 STOP DEPTH 10473.5 10529.0 EQUIVALENT UNSHIFTED DEPTH BIT RUN NO MERGE TOP MERGE BASE 2 7484.0 9289.0 3 9289.0 9750.0 4 9750.0 10160.0 5 10160.0 10493.0 MERGED MAIN PASS. $ Data Format Specification Record Data Record Type .................. 0 Data Specification Block Type ..... 0 Logging Direction ................. Down Optical log depth units ........... Feet Data Reference Point .............. Undefined Frame Spacing ..................... 60 .liN Max frames per record ............. Undefined Absent value ...................... -999.25 Depth Units ....................... Datum Specification Block sub-type...0 Name Service Order Units Size Nsam Rep Code Offset Channel DEPT FT 4 1 68 0 1 ROP MWD FT/H 4 1 68 4 2 GR MWD API 4 1 68 8 3 First Name Min Max Mean Nsam Reading DEPT 7413.5 10529 8971.25 6232 7413.5 Last R~ading 10529 ROP 2.8147 839.904 72.1688 6042 GR 16.9149 331.365 91.1162 5258 7508.5 10529 7413.5 10473.5 First Reading For Entire File .......... 7413.5 Last Reading For Entire File ........... 10529 File Trailer Service name ............. STSLIB.001 Service Sub Level Name... Version Number ........... 1.0.0 Date of Generation ....... 98/11/25 Maximum Physical Record..65535 File Type ................ LO Next File Name ........... STSLIB.002 Physical EOF File Header Service name ............. STSLIB.002 Service Sub Level Name... Version Number ........... 1.0.0 Date of Generation ....... 98/11/25 Maximum Physical Record..65535 File Type ................ LO Previous File Name ....... STSLIB.001 Comment Record FILE HEADER FILE NUMBER: 2 P~AW MWD Curves and log header data for each bit run in separate files. BIT RUN N-UMBER: 2 DEPTH INCREMENT: .5000 FILE SUMMARY VENDOR TOOL CODE START DEPTH STOP DEPTH GR 7400.5 9224.0 ROP 7484.5 9289.5 $ LOG HEADER DATA DATE LOGGED: 06-~JL-98 SOFTWARE SURFACE SOFTWARE VERSION: DOWNHOLE SOFTWARE VERSION: DATA TYPE (MEMORY OR REAL-TIME): TD DRILLER (FT) : TOP LOG INTERVAL (FT) : BOTTOM LOG INTERVAL (FT) : BIT ROTATING SPEED (RPM) : HOLE INCLINATION (DEG MINIMUM ANGLE: 25.2 MAXIMUM ANGLE: 55.8 ISC 5.07 PCD 3.01/PCG 7.53/NGP 5.74 MEMORY 9289.0 7484.0 9289.0 TOOL STRING (TOP TO BOTTOM) VENDOR TOOL CODE TOOL TYPE NGP NATURAL GAMMA PROBE $ BOREHOLE AND CASING DATA OPEN HOLE BIT SIZE (IN): DRILLER'S CASING DEPTH (FT) : BOREHOLE CONDITIONS MUD TYPE: MUD DENSITY (LB/G): MUD VISCOSITY (S) : MUD PH: MUD CHLORIDES (PPM): FLUID LOSS (C3) : RESISTIVITY (OHMM) AT TEMPERATURE (DEGF) MUD AT MEASURED TEMPERATURE (MT): MUD AT MAX CIRCULATING TERMPERATURE: MUD FILTRATE AT MT: MUD CAKE AT MT: NEUTRON TOOL MATRIX: MATRIX DENSITY: HOLE CORRECTION (IN): TOOL STANDOFF (IN): EWR FREQUENCY (HZ): REMARKS: $ Data Format Specification Record Data Record Type .................. 0 Data Specification Block Type ..... 0 Logging Direction ................. Down Optical log depth units ........... Feet Data Reference Point .............. Undefined Frame Spacing ..................... 60 .lin Max frames per record ............. Undefined Absent value ...................... -999.25 Depth Units ....................... Datum Specification Block sub-type...0 TOOL NUMBER PCG 47 8.500 8.5 LSND 10.40 56.0 9.2 1500 3.4 .000 .000 .000 .000 63.3 .6 Name Service Order Units Size Nsam Rep Code Offset Channel DEPT FT 4 1 68 0 1 GR MWD 2 API 4 1 68 4 2 ROP MWD 2 FT/H 4 1 68 8 3 First Name Min Max Mean Nsam Reading DEPT 7400.5 9289.5 8345 3779 7400.5 GR 23.7208 283.812 95.3605 3648 7400.5 Last Reading 9h89.5 9224 ROP 7.8303 617.848 64.6674 3611 7484.5 9289.5 First Reading For Entire File 7400.5 Last Reading For Entire File ........... 9289.5 File Trailer Service name ............. STSLIB.002 Service Sub Level Name... Version Number ........... 1.0.0 Date of Generation ....... 98/11/25 Maximum Physical Record..65535 File Type ................ LO Next File Name ........... STSLIB.003 Physical EOF File Header Service name ............. STSLIB.003 Service Sub Level Name... Version Number ........... 1.0.0 Date of Generation ....... 98/11/25 Maximum Physical Record..65535 File Type ................ LO Previous File Name ....... STSLIB.002 Comment Record FILE HE~DER FILE NUMBER: 3 , RAW MWD Curves and log header data for each bit run in separate files. BIT RUN NUMBER: 3 DEPTH INCREMENT: .5000 FILE SUMMARY VENDOR TOOL CODE START DEPTH GR 9225.0 ROP 9290.0 $ LOG HEADER DATA DATE LOGGED: SOFTWARE SURFACE SOFTWARE VERSION: DOWNHOLE SOFTWARE VERSION: DATA TYPE (MEMORY OR REAL-TIME): TD DRILLER (FT) : TOP LOG INTERVAL (FT) : BOTTOM LOG INTERVAL (FT) : BIT ROTATING SPEED (RPM) : HOLE INCLINATION (DEG MINIMUM A/qGLE: MAXIMUM A/~GLE: STOP DEPTH 9686.5 9750.5 08-J/3L-98 ISC 5.07 PCD 3.01/PCG 7.53/NGP 5.74 MEMORY 9750.~0 9289.0 9750.0 35.5 46.7 TOOL STRING (TOP TO BOTTOM) VENDOR TOOL CODE TOOL TYPE NGP NATURAL GAMMA PROBE $ BOREHOLE AND CASING DATA OPEN HOLE BIT SIZE (IN): DRILLER'S CASING DEPTH (FT) : BOREHOLE CONDITIONS MUD TYPE: MUD DENSITY (LB/G) : MUD VISCOSITY (S) : MUD PH: MUD CHLORIDES (PPM) : FLUID LOSS (C3): RESISTIVITY (OHMM) AT TEMPERATURE (DEGF) MUD AT MEASURED TEMPERATURE (MT): MUD AT MAX CIRCULATING TERMPERATURE: MUD FILTRATE AT MT: MUD CAKE AT MT: NEUTRON TOOL MATRIX: MATRIX DENSITY: HOLE CORRECTION (IN) : TOOL STANDOFF (IN) : EWR FREQUENCY (HZ) : REMARKS: $ Data Format Specification Record Data Record Type .................. 0 Data Specification Block Type ..... 0 Logging Direction ................. Down Optical log depth units ........... Feet Data Reference Point .............. Undefined Frame Spacing ..................... 60 .liN Max frames per record ............. Undefined Absent value ...................... -999.25 Depth Units ....................... Datum Specification Block sub-type...0 TOOL NUMBER NGP SPC 178 8.500 8.5 LSND 10.40 54.0 9.0 1200 3.2 .000 .000 .000 .000 65.6 .6 Name Service Order Units Size Nsam Rep Code Offset Channel DEPT FT 4 1 68 0 1 GR MWD 3 API 4 1 68 4 2 ROP MWD 3 FT/H 4 1 68 8 3 First Name Min Max Mean Nsam Reading DEPT 9225 9750.5 9487.75 1052 9225 GR 46.1497 331.365 120.426 924 9225 ROP 8.0754 406.038 54.6011 922 9290 Last Reading 9750.5 9750.5 First Reading For Entire File .......... 9225 Last Reading For Entire File ............ 9750.5 File Trailer Service name ............. STSLIB.003 Service Sub Level Name... Version Number ........... 1.0.0 Date of Generation ....... 98/11/25 Maximum Physical Record..65535 File Type ................ LO Next File Name ........... STSLIB.004 Physical EOF File Header Service name ............. STSLIB.004 Service Sub Level Name... Version Number ........... 1.0.0 Date of Generation ....... 98/11/25 Maximum Physical Record..65535 File Type ................ LO Previous File Name ....... STSLIB.003 Comment Record FILE HEADER FILE NUMBER: 4 RAW MWD Curves and log header data for each bit run in separate files. BIT RUN NUMBER: 4 DEPTH INCREMENT: .5000 FILE SUMMARY VENDOR TOOL CODE START DEPTH STOP DEPTH ROP 9755.0 10173.0 $ LOG HEADER DATA DATE LOGGED: 11 - JUL- 98 SOFTWARE SURFACE SOFTWARE VERSION: DOWNHOLE SOFTWARE VERSION: DATA TYPE (MEMORY OR REAL-TIME): TD DRILLER (FT) : TOP LOG INTERVAL (FT) : BOTTOM LOG INTERVAL (FT) : BIT ROTATING SPEED (RPM) : HOLE INCLINATION (DEG MINIMUM ANGLE: 19.6 MAXIMUM ANGLE: 33 . 7 TOOL STRING (TOP TO BOTTOM) VENDOR TOOL CODE TOOL TYPE TOOL NUMBER ISC 5.07 PCD 3.01/PCG 7.53/NGP 5.74 MEMORY 10160.0 9750.0 10160~0 NGP $ NATURAL GAMMA PROBE BOREHOLE AND CASING DATA OPEN HOLE BIT SIZE (IN): DRILLER'S CASING DEPTH (FT): BOREHOLE CONDITIONS MUD TYPE: MUD DENSITY (LB/G) : MUD VISCOSITY (S): MUD PH: MUD CHLORIDES (PPM) : FLUID LOSS (C3) : RESISTIVITY (OHMM) AT TEMPERATURE (DEGF) MUD AT MEASURED TEMPERATURE (MT): MUD AT MAX CIRCULATING TERMPERATURE: MUD FILTRATE AT MT: MUD CAKE AT MT: NEUTRON TOOL MATRIX: MATRIX DENSITY: HOLE CORRECTION (IN): TOOL STANDOFF (IN) : EWR FREQUENCY (HZ) : REMARKS: $ Data Format Specification Record Data Record Type .................. 0 Data Specification Block Type ..... 0 Logging Direction ................. Down Optical log depth units ........... Feet Data Reference Point .............. Undefined Frame Spacing ..................... 60 .liN Max frames per record ............. Undefined Absent value ...................... -999.25 Depth Units ....................... Datum Specification Block sub-type...0 NGP SPC 178 6.000 6.0 QUIK DRILN 8.60 61.0 9.0 19000 8.0 .000 .000 .000 .000 53.9 .6 Name Service Order Units Size Nsam Rep Code Offset Channel DEPT FT 4 1 68 0 1 ROP MWD 4 FT/H 4 1 68 4 2 First Name Min Max Mean Nsam Reading DEPT 9755 10173 9964 837 9755 ROP 2.8147 839.904 104.896 837 9755 Last Reading 10173 10173 First Reading For Entire File .......... 9755 Last Reading For Entire File ........... 10173 File Trailer Service name ............. STSLIB.004 Service Sub Level Name... Version~Number ........... 1.0.0 Date of Generation ....... 98/11/25 Maximum Physical Record..65535 File Type ................ LO Next File Name ........... STSLIB.005 Physical EOF File Header Service name ............. STSLIB.005 Service Sub Level Name... Version Number ........... 1.0.0 Date of Generation ....... 98/11/25 Maximum Physical Record..65535 File Type ................ LO Previous File Name ....... STSLIB.004 Comment Record FILE HEADER FILE NUMBER: 5 RAW MWD Curves and log header data for each bit run in separate files. BIT RUN NUMBER: 5 DEPTH INCREMENT: .5000 FILE SUMMARY VENDOR TOOL CODE START DEPTH STOP DEPTH GR 10118 . 5 10449.5 ROP 10174 . 5 10505 . 0 $ LOG HEADER DATA DATE LOGGED: 12 -~3L- 98 SOFTWARE SURFACE SOFTWARE VERSION: DOWN-HOLE SOFTWARE VERSION: DATA TYPE (MEMORY OR REAL-TIME): TD DRILLER (FT) : TOP LOG INTERVAL (FT) : BOTTOM LOG INTERVAL (FT) : BIT ROTATING SPEED (RPM) : HOLE INCLINATION (DEG MINIMUM ANGLE: 33 . 4 ~ MAXI~ ANGLE: 57.7 TOOL STRING (TOP TO BOTTOM) VENDOR TOOL CODE TOOL TYPE NGP NATURAL GAMMA PROBE $ ISC 5.07 PCD 3.01/PCG 7.53/NGP 5.74 MEMORY 10493.0 10160.0 10493.0 TOOL N-JMBER PCG 47 BOREHOLE AND CASING DATA OPEN HOLE BIT SIZE (IN): DRILLER'S CASING DEPTH (FT) : BOREHOLE CONDITIONS MUD TYPE: MUD DENSITY (LB/G): MUD VISCOSITY (S) : MUD PH: MUD CHLORIDES (PPM) : FLUID LOSS (C3) : RESISTIVITY (OHMM) AT TEMPERATURE (DEGF) MUD AT MEASURED TEMPERATURE (MT): MUD AT MAX CIRCULATING TERMPERATURE: MUD FILTRATE AT MT: MUD CAKE AT MT: NEUTRON TOOL MATRIX: MATRIX DENSITY: HOLE CORRECTION (IN): TOOL STANDOFF (IN): EWR FREQUENCY (HZ) : REMARKS: $ Data Format Specification Record Data Record Type .................. 0 Data Specification Block Type ..... 0 Logging Direction ................. Down Optical log depth units ........... Feet Data Reference Point .............. Undefined Frame Spacing ..................... 60 .liN Max frames per record ............. Undefined Absent value ...................... -999.25 Depth Units ....................... Datum Specification Block sub-type...0 6.000 6.0 QUIK DRILN 8.60 63.0 8.8 19000 7.8 .000 .000 .000. .000 .6 Name Service Order Units Size Nsam Rep Code Offset Channel DEPT FT 4 1 68 0 1 GR MWD 5 API 4 1 68 4 2 ROP MWD 5 FT/H 4 1 68 8 3 49.5 First Name Min Max Mean Nsam Reading DEPT 10118.5 10505 10311.8 774 10118.5 GR 16.9149 109.753 28.2431 663 10118.5 ROP 21.0534 445.487 95.3687 662 10174.5 Last Reading 10505 10449.5 10505 First Reading For Entire File .......... 10118.5 Last Reading For Entire File ........... 10505 File Trailer Service name ............. STSLIB.005 Service Sub Level Name... Version Number ........... 1.0.0 Date of Generation ....... 98/11/25 Maximum Physical Record..65535 File Type ................ LO Next File Name ........... STSLIB.006 Physical EOF Tape Trailer Service name ............. LISTPE Date ..................... 98/11/25 Origin ................... STS Tape Name ................ UNKNOWN Continuation Number ...... 01 Next Tape Name ........... UNKNOWN Comments ................. STS LIS Writing Services Reel Trailer Service name ............. LISTPE Date ..................... 98/11/25 Origin ................... STS Reel Name ................ UNKNOWN Continuation Number ...... 01 Next Reel Name ........... UNKNOWN Comments ................. STS LIS Writing Services Library. Library. Scientific Scientific Technical Technical Physical EOF Physical EOF End Of LIS File Sperry-Sun Drilling Services LIS Scan Utility Tue Dec 01 15:29:26 1998 Reel Header Service name ............. LISTPE Date ..................... 98/12/01 Origin ................... STS Reel Name ................ UNKNOWN Continuation Number ...... 01 Previous Reel Name ....... UNKNOWN Comments ................. STS LIS Writing Library. Scientific Technical Services Tape Header Service name ............. LISTPE Date ..................... 98/12/01 Origin ................... STS Tape Name ................ UNKNOWN Continuation Number ...... 01 Previous Tape Name ....... UNKNOWN Comments ................. STS LIS Writing Library. Scientific Technical Services Physical EOF Comment Record TAPE HEADER PRUDHOE BAY MWD/M~ LOGS WELL NAME: API NUMBER: OPERATOR: LOGGING COMPANY: TAPE CREATION DATE: JOB DATA JOB NUMBER: LOGGING ENGINEER: OPERATOR WITNESS: D.S. 2-07A PB2 500292015471 ARCO ALASKA, INC. SPERRY-SUN DRILLING SERVICES 01-DEC-98 MWD RUN 2 MWD RUN 3 MWD RUN 4 AK-MM-80266 AK-MM- 80266 AK-MM- 80266 E. CRIBBS E. CRIBBS E. CRIBBS R. JAYE R. JAYE R. JAYE JOB NUMBER: LOGGING ENGINEER: OPERATOR WITNESS: JOB NUMBER: LOGGING ENGINEER: MWD RUN 5 AK-MM-80266 E. CRIBBS R. JAYE MWD RUN 7 AK-MM- 80266 G. GRIFFIN MWD RUN 6 AK-MM- 80266 G. GRIFFIN P. WILSON MWD RUN 6 AK-MM- 80266 G. GRIFFIN P. WILSON DEC 08 %998 ~a 0{i & Gss C0ns.-~mm~0~ OPERATOR WITNESS: SURFACE LOCATION SECTION: TOWNSHIP: RANGE: FNL: FSL: FEL: FWL: ELEVATION (FT FROM MSL 0) KELLY BUSHING: DERRICK FLOOR: GROUND LEVEL: WELL CASING RECORD P. WILSON 36 liN 14E 1570 1036 .00 58.80 29.60 OPEN HOLE CASING DRILLERS BIT SIZE (IN) SIZE (IN) DEPTH (FT) 1ST STRING 13.375 2736.0 2ND STRING 9.625 7445.0 3RD STRING 8.500 7.000 9745.0 PRODUCTION STRING 6.000 11472.0 REMARKS: 1. ALL DEPTHS ARE MEASURED DEPTHS (MD) UNLESS OTHERWISE NOTED. 2. MWD RUN 1 IS DIRECTIONAL ONLY AND IS NOT PRESENTED. 3. MWD RUNS 2-5 ARE DIRECTIONAL WITH NATURAL GAMMA PROBE (NGP) UTILIZING A SCINTILLATION DETECTOR. 4. MWD RUN 4 WAS DRILLED WITHOUT GAMMA RAY DATA OWING TO TOOL FAILURE, AND MWD RUN 5 DID NOT ACQUIRE DATA OVER THIS INTERVAL ON A MEASUREMENT AFTER DRILL- ING (MAD) PASS. ONLY ROP DATA IS PRESENTED. 5. GAMMA DATA FROM MWD RUN 5 ENDS AT 10139' MD, 8804' TVD, THE KICKOFF POINT FOR THIS WELL. NO OTHER DATA FROM RUN 5 IS PRESENTED. 6. ANADRILL'S ABI WAS UTILIZED TO KICKOFF FROM 2-07APB1 AND LAND THE WELL HORIZONTALLY. NO DATA IS PRESENTED IN THIS INTERVAL (10139'MD, 8804'TVD TO 10615'MD, 9048'TVD) . 7. MWD RUNS 6 AND 7 ARE DIRECTIONAL WITH DUAL GAMMA RAY (DGR) UTILIZING GEIGER-MUELLER TUBE DETECTORS AND ELECTROMAGNETIC WAVE RESISTIVITY PHASE-4 (EWR4) . 8. MWD DATA IN THE INTERVAL 10457'MD, 9016'TVD TO 11380'MD, 9028'TVD WAS ACQUIRED ON A MAD PASS WHILE TRIPPING OUT OF THE HOLE FOLLOWING MWD RI/N 6. 9. MWD RUNS 2 - 7 REPRESENT WELL 02-07A PB2 WITH API#: 50-029-20154-71. THIS WELL REACHED A TOTAL DEPTH (TD) OF 11472'MD, 9018'TVD. SROP = SMOOTHED RATE OF PENETRATION WHILE DRILLING. SGRD = SMOOTHED GAMMA RAY. SGRC = SMOOTHED GAMMA RAY COMBINED. SEXP = SMOOTHED PHASE SHIFT-DERIVED RESISTIVITY (EXTRA- SHALLOW SPACING) . SESP = SMOOTHED PHASE SHIFT-DERIVED RESISTIVITY (SHALLOW SPACING). SEMP = SMOOTHED PHASE SHIFT-DERIVED RESISTIVITY (MEDIUM SPACING). SEDP = SMOOTHED PHASE SHIFT-DERIVED RESISTIVITY (DEEP SPACING). SFXE = SMOOTHED FORMATION EXPOSURE TIME. SRAT = SMOOTHED TOOL SPEED WHEN NOT DRILLING. CURVES WITH THE EXTENSION "M" DENOTE MAD PASS DATA. $ File Header Service name ............. STSLIB. 001 Service Sub Level Name... Version Number ........... 1.0.0 Date of Generation ....... 98/12/01 Maximum Physical Record..65535 File Type ................ LO Previous File Name ....... STSLIB. 000 Comment Record FILE HEADER FILE NUMBER: 1 EDITED MERGED MWD Depth shifted and clipped curves; all bit runs merged. DEPTH INCREMENT: .5000 FILE SUMMARY PBU TOOL CODE START DEPTH STOP DEPTH GR 7413.5 11453.0 ROP 7508.5 11496.0 RPD 10647.0 11460.0 RPM 10647.0 11460.0 RPS 10647.0 11460.0 RPX 10647.0 11460.0 FET 10692.0 11460.0 $ BASELINE CURVE FOR SHIFTS: CURVE SHIFT DATA (MEASURED DEPTH) BASELINE DEPTH 7413 7418 7421 7426 7427 7433 7436 7439 7442 7445 11496 $ GR 5 7400.5 0 7404.5 5 7406.0 5 7407.5 5 7409.0 0 7411.0 0 7416.0 0 7418.5 0 7420.0 0 7421.0 0 11472.0 EQUIVALENT UNSHIFTED DEPTH MERGED DATA SOURCE PBU TOOL CODE MWD MWD MWD MWD MWD MWD $ REMARKS: BIT RUN NO MERGE TOP MERGE BASE 2 7484.0 9289.0 3 9289.0 9750.0 4 9750 . 0 10139.0 5 10160 . 0 10493 . 0 6 10668.0 11396.0 7 11396 . 0 11472 . 0 MERGED MAIN PASS. $ Data Format Specification Record Data Record Type .................. 0 Data Specification Block Type ..... 0 Logging Direction ................. Down Optical log depth units ..... ~ ..... Feet Data Reference Point .............. Undefined Frame Spacing ..................... 60 .lin Max frames per record ............. Undefined Absent value ...................... -999.25 Depth Units ....................... Datum Specification Block sub-type...0 Name Service Order Units Size Nsam Rep DEPT FT 4 1 68 GR MWD API 4 1 68 ROP MWD FT/H 4 1 68 RPX MWD OHMM 4 1 68 RPS MWD OHMM 4 1 68 RPM MWD OHMM 4 1 68 RPD MWD OHMM 4 1 68 FET MWD HOUR 4 1 68 Code Offset Channel 0 1 4 2 8 3 12 4 16 5 20 6 24 7 28 8 Name Min Max DEPT 7413.5 11496 GR 18.0331 331.365 ROP 1.9152 926.628 RPX 3.952 23.4241 RPS 5.5748 23.7044 RPM 6.0573 22.1864 RPD 6.8818 21.7123 FET 0.7194 35.2055 Mean 9454.75 96 7141 67 4626 12 6267 13 8683 13 6285 14 0931 4.70872 Nsam 8166 6265 6914 1627 1627 1627 1627 1537 First Reading 7413.5 7413.5 7508.5 10647 10647 10647 10647 10692 Last Reading 11496 11453 11496 11460 11460 11460 11460 11460 First Reading For Entire File .......... 7413.5 Last Reading For Entire File ........... 11496 File Trailer Service name ............. STSLIB.001 Service Sub Level Name... Version Number ........... 1.0.0 Date of Generation ....... 98/12/01 Maximum Physical Record..65535 File Type ................ LO Next File Name ........... STSLIB.002 Physical EOF File Header Service name ............. STSLIB.002 Service Sub Level Name... Version Number ........... 1.0.0 Date of Generation ....... 98/12/01 Maximum Physical Record..65535 File Type ................ LO Previous File Name ....... STSLIB.001 Comment Record FILE HEADER FILE NUMBER: 2 EDITED MERGED MAD Depth shifted and clipped curves; all MAD runs merged using earliest passes. DEPTH INCREMENT: FILE SUMMARY PBU TOOL CODE GR RPD RPM RPS RPX RAT FET $ MERGED DATA SOURCE PBU TOOL CODE MWD $ REMARKS: .5000 START DEPTH STOP DEPTH 10481.0 11349.5 10487.0 11357.0 10487.0 11357.0 10487.0 11357.0 10487.0 11357.0 10545.0 11403.5 10689.5 11357.0 MAD RUN NO. MAD PASS NO. 6 MERGED MAD PASS. $ Data Format Specification Record Data Record Type .................. 0 Data Specification Block Type ..... 0 Logging Direction ................. Down Optical log depth units ........... Feet Data Reference Point .............. Undefined Frame Spacing ..................... 60 .liN Max frames per record ............. Undefined Absent value ...................... -999.25 Depth Units ....................... Datum Specification Block sub-type...0 MERGE TOP 10457.0 MERGE BASE 11380.0 Name Service Order Units Size Nsam DEPT FT 4 1 GR MAD API 4 1 RAT MAD FT/H 4 1 RPX MAD OHMM 4 1 RPS MAD OHMM 4 1 RPM MAD OHMM 4 1 RPD MAD OH]~M 4 1 FET MAD HOUR 4 1 Rep Code Offset Channel 68 0 1 68 4 2 68 8 3 68 12 4 68 16 5 68 20 6 68 24 7 68 28 8 Name Min Max Mean DEPT 10481 11403.5 10942.2 GR 15.3187 215.224 75.6355 RAT 317.821 639.164 472.068 RPX 3.5467 18.4688 10.4932 RPS 4.0231 27.9701 12.3705 RPM 4.509 40.4745 12.7542 RPD 5.6758 28.41 13.4949 FET 6.0701 46.3845 32.594 First Last Nsam Reading Reading 1846 10481 11403.5 1738 10481 11349.5 1718 10545 11403..5 1741 10487 11357 1741 10487 11357 1741 10487 11357 1741 10487 11357 1336 10689.5 11357 First Reading For Entire File .......... 10481 Last Reading For Entire File ........... 11403.5 File Trailer Service name ............. STSLIB.002 Service Sub Level Name... Version Number ........... 1.0.0 Date of Generation ....... 98/12/01 Maximum Physical Record..65535 File Type ................ LO Next File Name ........... STSLIB.003 Physical EOF File Header Service name ............. STSLIB.003 Service Sub Level Name... Version Number ........... 1.0.0 Date of Generation ....... 98/12/01 Maximum Physical Record..65535 File Type ................ LO Previous File Name ....... STSLIB.002 Comment Record FILE HEADER FILE NUMBER: 3 RAW MWD Curves and log header data for each bit run in separate files. BIT RUN NUMBER: 2 DEPTH INCREMENT: .5000 FILE SUMMARY VENDOR TOOL CODE START DEPTH GR 7400.5 ROP 7484.5 $ LOG HEADER DATA DATE LOGGED: SOFTWARE SURFACE SOFTWARE VERSION: DOWNHOLE SOFTWARE VERSION: DATA TYPE (MEMORY OR REAL-TIME): TD DRILLER (FT) : TOP LOG INTERVAL (FT) : BOTTOM LOG INTERVAL (FT): BIT ROTATING SPEED (RPM): HOLE INCLINATION (DEG MINIMUM ANGLE: MAXIMUM ANGLE: STOP DEPTH 9224.0 9289.5 TOOL STRING (TOP TO BOTTOM) VENDOR TOOL CODE TOOL TYPE NGP NATURAL GAMMA PROBE $ BOREHOLE AND CASING DATA OPEN HOLE BIT SIZE (IN): DRILLER' S CASING DEPTH (FT) : BOREHOLE CONDITIONS MUD TYPE: MUD DENSITY (LB/G): MUD VISCOSITY (S) : MUD PH: MUD CHLORIDES (PPM): FLUID LOSS (C3) : RESISTIVITY (OHMM) AT TEMPERATURE (DEGF) MUD AT MEASURED TEMPERATURE (MT): MUD AT MAX CIRCULATING TERMPERATURE: MUD FILTRATE AT MT: MUD CAKE AT MT: NEUTRON TOOL MATRIX: MATRIX DENSITY: HOLE CORRECTION (IN): TOOL STANDOFF (IN): EWR FREQUENCY (HZ) : REMARKS: $ Data Format Specification Record Data Record Type .................. 0 Data Specification Block Type ..... 0 06-JI/L-98 5.07 5.46 MEMORY 9289.0 7484.0 9289.0 25.2 55.8 TOOL NUMBER PCG 47 8.500 8.5 LSND 10.40 56.0 9.2 1500 3.4 .000 .000 .000 .000 63.3 .6 Logging Direction ................. Down Optical log depth units ........... Feet Data Reference Point .............. Undefined Frame Spacing ..................... 60 .liN Max frames per record ............. Undefined Absent Value ...................... -999.25 Depth Units ....................... Datum Specification Block sub-type...0 Name Service Order Units Size Nsam Rep Code Offset Channel DEPT FT 4 1 68 0 1 GR MWD 2 D~PI 4 1 68 4 2 ROP MWD 2 FT/H 4 1 68 8 3 First Name Min Max Mean Nsam Reading DEPT 7400.5 9289.5 8345 3779 7400.5 GR 23.7208 283.812 95.3605 3648 7400.5 ROP 7.8303 617.848 64.6674 3611 7484.5 Last Reading 9289.5 9224 9289.5 First Reading For Entire File .......... 7400.5 Last Reading For Entire File ........... 9289.5 File Trailer Service name ............. STSLIB.003 Service Sub Level Name... Version Number ........... 1.0.0 Date of Generation ....... 98/12/01 Maximum Physical Record..65535 File Type ................ LO Next File Name ........... STSLIB.004 Physical EOF File Header Service name ............. STSLIB.004 Service Sub Level Name... Version Number ........... 1.0.0 Date of Generation ....... 98/12/01 Maximum Physical Record..65535 File Type ................ LO Previous File Name ....... STSLIB.003 Comment Record FILE HEA]DER FILE NUMBER: 4 RAW MWD Curves and log header data for each bit run in separate files. BIT RUN NUMBER: 3 DEPTH INCREMENT: .5000 FILE SUMMARY VENDOR TOOL CODE START DEPTH GR 9225.0 ROP 9290.0 $ LOG HEADER DATA DATE LOGGED: SOFTWARE SURFACE SOFTWARE VERSION: DOWNHOLE SOFTWARE VERSION: DATA TYPE (MEMORY OR REAL-TIME): TD DRILLER (FT) : TOP LOG INTERVAL (FT) : BOTTOM LOG INTERVAL (FT): BIT ROTATING SPEED (RPM): HOLE INCLINATION (DEG MINIMUM ANGLE: MAXIMUM ANGLE: STOP DEPTH 9686.5 9750.5 TOOL STRING (TOP TO BOTTOM) VENDOR TOOL CODE TOOL TYPE NGP NATURAL GAMMA PROBE $ BOREHOLE AND CASING DATA OPEN HOLE BIT SIZE (IN): DRILLER'S CASING DEPTH (FT) : BOREHOLE CONDITIONS MUD TYPE: MUD DENSITY (LB/G): MUD VISCOSITY (S) : MUD PH: MUD CHLORIDES (PPM) : FLUID LOSS (C3) : RESISTIVITY (OHMM) AT TEMPERATURE (DEGF) MUD AT MEASURED TEMPERATURE (MT): MUD AT MAX CIRCULATING TERMPERATURE: MUD FILTRATE AT MT: MUD CAKE AT MT: NEUTRON TOOL MATRIX: MATRIX DENSITY: HOLE CORRECTION (IN): TOOL STANDOFF (IN): EWR FREQUENCY (HZ) : REMARKS: $ Data Format Specification Record Data Record Type .................. 0 Data Specification Block Type ..... 0 Logging Direction ................. Down 08-JUL-98 5.07 5.46 MEMORY 9750.0 9289.0 9750.0 35.5 46.7 TOOL NUMBER NGP SPC 178 8.500 8.5 LSND 10.40 54.0 9.0 1200 3.2 .000 .000 .000 .000 65.6 .6 Optical log depth units ........... Feet Data Reference Point .............. Undefined Frame Spacing ..................... 60 .liN Max frames per record .............. Undefined Absent value ...................... -999.25 Depth Units ....................... Datum Specification Block sub-type...0 Name Service Order Units Size Nsam Rep Code Offset Channel DEPT FT 4 1 68 0 1 GR MWD 3 API 4 1 68 4 2 ROP MWD 3 FT/H 4 1 68 8 3 First Name Min Max Mean Nsam Reading DEPT 9225 9750.5 9487.75 1052 9225 GR 46.1497 331.365 120.426 924 9225 ROP 8.0754 406.038 54.6011 922 9290 Last Reading 9750.5 9686.5 9750.5 First Reading For Entire File .......... 9225 Last Reading For Entire File ........... 9750.5 File Trailer Service name ............. STSLIB.004 Service Sub Level Name... Version Number ........... 1.0.0 Date of Generation ....... 98/12/01 Maximum Physical Record..65535 File Type ................ LO Next File Name ........... STSLIB.005 Physical EOF File Header Service name ............. STSLIB.005 Service Sub Level Name... Version Number ........... 1.0.0 Date of Generation ....... 98/12/01 Maximum Physical Record..65535 File Type ................ LO Previous File Name ....... STSLIB.004 Comment Record FILE HEADER FILE NUMBER: 5 RAW MWD Curves and log header data for each bit run in separate files. BIT RUN NUMBER: 4 DEPTH INCREMENT: .5000 FILE SUMMARY VENDOR TOOL CODE START DEPTH ROP 9755.0 $ LOG HEADER DATA DATE LOGGED: SOFTWARE SURFACE SOFTWARE VERSION: DOWNHOLE SOFTWARE VERSION: DATA TYPE (MEMORY OR REAL-TIME): TD DRILLER (FT) : TOP LOG INTERVAL (FT) : BOTTOM LOG INTERVAL (FT): BIT ROTATING SPEED (RPM) : HOLE INCLINATION (DEG MINIMUM ANGLE: MAXIMUM ANGLE: TOOL STRING (TOP TO BOTTOM) VENDOR TOOL CODE TOOL TYPE NGP NATURAL GAMMA PROBE $ BOREHOLE AND CASING DATA OPEN HOLE BIT SIZE (IN): DRILLER'S CASING DEPTH (FT) : BOREHOLE CONDITIONS MUD TYPE: MUD DENSITY (LB/G): MUD VISCOSITY (S) : MUD PH: MUD CHLORIDES (PPM) : FLUID LOSS (C3) : RESISTIVITY (OHMM) AT TEMPERATURE (DEGF) MUD AT MEASURED TEMPERATURE (MT): MUD AT MAX CIRCULATING TERMPERATURE: MUD FILTRATE AT MT: MUD CAKE AT MT: NEUTRON TOOL MATRIX: MATRIX DENSITY: HOLE CORRECTION (IN): TOOL STANDOFF (IN): EWR FREQUENCY (HZ): REMARKS: $ Data Format Specification Record Data Record Type .................. 0 Data Specification Block Type ..... 0 Logging Direction ................. Down Optical log depth units ........... Feet Data Reference Point .............. Undefined STOP DEPTH 10139.0 il-JUL-98 5.07 5.46 MEMORY 10139.0 9750.0 10139.0 19.6 33.7 TOOL NUMBER NGP SPC 178 6.000 6.0 QUIK DRILN 8.60 61.0 9.0 19000 8.0 .000 .000 .000 .000 53.9 .6 Frame Spacing ..................... 60 .liN Max frames per record ............. Undefined Absent value ...................... -999.25 Depth Units ....................... Datum Specification Block sub-type...0 Name Service Order Units Size Nsam Rep Code Offset Channel DEPT FT 4 1 68 0 1 ROP MWD 4 FT/H 4 1 68 4 2 First Name Min Max Mean Nsam Reading DEPT 9755 10139 9947 769 9755 ROP 4.5712 839.904 112.508 769 9755 Last Reading 10139 10139 First Reading For Entire File .......... 9755 Last Reading For Entire 'File ........... 10139 File Trailer Service name ............. STSLIB.005 Service Sub Level Name... Version Number ........... 1.0.0 Date of Generation ....... 98/12/01 Maximum Physical Record..65535 File Type ................ LO Next File Name ........... STSLIB.006 Physical EOF File Header Service name ............. STSLIB.006 Service Sub Level Name... Version Number ........... 1.0.0 Date of Generation ....... 98/12/01 Maximum Physical Record..65535 File Type ................ LO Previous File Name ....... STSLIB.005 Comment Record FILE HEADER FILE NUMBER: 6 P~AW MWD Curves and log header data for each bit run in separate files. BIT RUN NUMBER: 5 DEPTH INCREMENT: .5000 FILE SUMMARY VENDOR TOOL CODE START DEPTH STOP DEPTH GR 10118.5 10139.0 $ LOG HEADER DATA DATE LOGGED: SOFTWARE SURFACE SOFTWARE VERSION: DOWNHOLE SOFTWARE VERSION: DATA TYPE (MEMORY OR REAL-TIME): TD DRILLER (FT) : TOP LOG INTERVAL (FT) : BOTTOM LOG INTERVAL (FT) : BIT ROTATING SPEED (RPM) : HOLE INCLINATION (DEG MINIMUM ANGLE: MAXIMUM ANGLE: TOOL STRING (TOP TO BOTTOM) VENDOR TOOL CODE TOOL TYPE NGP NATURAL GAMMA PROBE $ BOREHOLE AND CASING DATA OPEN HOLE BIT SIZE (IN): DRILLER'S CASING DEPTH (FT) : BOREHOLE CONDITIONS MUD TYPE: MUD DENSITY (LB/G): MUD VISCOSITY (S): MUD PH: MUD CHLORIDES (PPM) : FLUID LOSS (C3) : RESISTIVITY (OHMM) AT TEMPER3kT%TRE (DEGF) MUD AT MEASURED TEMPERATURE (MT): MUD AT MAX CIRCULATING TERMPERATURE: MUD FILTRATE AT MT: MUD CAKE AT MT: NEUTRON TOOL MATRIX: MATRIX DENSITY: HOLE CORRECTION (IN): TOOL STANDOFF (IN): EWR FREQUENCY (HZ): REMARKS: $ Data Format Specification Record Data Record Type .................. 0 Data Specification Block Type ..... 0 Logging Direction ................. Down Optical log depth units ........... Feet Data Reference Point .............. Undefined Frame Spacing ..................... 60 .lin Max frames per record ............. Undefined Absent value ...................... -999.25 Depth Units ....................... 12 - JLTL- 98 5.07 5.46 MEMORY 10493.0 10160.0 10493.0 33.4 57.7 TOOL N-UMBER PCG 47 6.000 6.0 QUIK DRILN 8.60 63.0 8.8 19000 7.8 .000 .000 .000 .000 53.9 .6 Datum Specification Block sub-type...0 Name Service Order Units Size Nsam Rep Code Offset Channel DEPT FT 4 1 68 0 1 GR MWD 5 API 4 1 68 4 2 First Name Min Max Mean Nsam Reading DEPT 10118.5 10139 10128.8 42 10118.5 GR 18.0331 71.1303 24.3974 42 10118.5 Last Reading 10139 10139 First Reading For Entire File .......... 10118.5 Last Reading For Entire File ........... 10139 File Trailer Service name ......... ~ .... STSLIB.006 Service Sub Level Name... Version Number ........... 1.0.0 Date of Generation ....... 98/12/01 Maximum Physical Record..65535 File Type ................ LO Next File Name ........... STSLIB.007 Physical EOF File Header Service name ............. STSLIB.007 Service Sub Level Name... Version Number ........... 1.0.0 Date of Generation ....... 98/12/01 Maximum Physical Record..65535 File Type ................ LO Previous File Name ....... STSLIB.006 Comment Record FILE HEADER FILE NUMBER: 7 RAW MWD Curves and log header data for each bit run in separate files. BIT RUN NUMBER: 6 DEPTH INCREMENT: .5000 FILE SUMMARY VENDOR TOOL CODE START DEPTH GR RPD RPM RPS RPX FET ROP 10615.5 10623 0 10623 0 10623 0 10623 0 10668 0 10670 5 STOP DEPTH 11342.5 11349.5 11349.5 11349.5 11349.5 11349.5 11396.0 $ LOG HEADER DATA DATE LOGGED: SOFTWARE SURFACE SOFTWARE VERSION: DOWN-HOLE SOFTWARE VERSION: DATA TYPE (MEMORY OR REAL-TIME): TD DRILLER (FT) : TOP LOG INTERVAL (FT) : BOTTOM LOG INTERVAL (FT) : BIT ROTATING SPEED (RPM): HOLE INCLINATION (DEG MINIMUM ANGLE: MAXIMUM ANGLE: TOOL STRING (TOP TO BOTTOM) VENDOR TOOL CODE TOOL TYPE DGR DUAL GAMMA RAY EWR4 ELECTROMAG. RESIS. 4 $ BOREHOLE AND CASING DATA OPEN HOLE BIT SIZE (IN): DRILLER'S CA~ING DEPTH (FT) : BOREHOLE CONDITIONS MUD TYPE: MUD DENSITY (LB/G): MUD VISCOSITY (S) : MUD PH: MUD CHLORIDES (PPM) : FLUID LOSS (C3) : RESISTIVITY (OHMM) AT TEMPERATURE (DEGF) MUD AT MEASURED TEMPERATURE (MT): MUD AT MAX CIRCULATING TERMPERATURE: MUD FILTRATE AT MT: MUD CAKE AT MT: NEUTRON TOOL MATRIX: MATRIX DENSITY: HOLE CORRECTION (IN): TOOL STANDOFF (IN): EWR FREQUENCY (HZ): REMARKS: $ Data Format Specification Record Data Record Type .................. 0 Data Specification Block Type ..... 0 Logging Direction ................. Down Optical log depth units ........... Feet Data Reference Point .............. Undefined Frame Spacing ..................... 60 .liN 18-JTJL- 98 5.07 5.46 MEMORY 11396.0 10668.0 11396.0 86.1 95.6 TOOL NUMBER P1047GR4 P1047GR4 6.000 6.0 QUIK DRILN 8.70 72.0 8.6 19000 5.0 .090 .186 .190 .160 61.1 .0 Max frames per record ............. Undefined Absent value ...................... -999.25 Depth Units ....................... Datum Specification Block sub.type...0 Name ServiCe Order Units Size Nsam DEPT FT 4 1 GR MWD 6 API 4 1 RPX MWD 6 OHMM 4 1 RPS MWD 6 OHMM 4 1 RPM MWD 6 OHMM 4 1 RPD MWD 6 OHMM 4 1 ROP MWD 6 FT/H 4 1 FET MWD 6 HOUR 4 1 Rep Code Offset Channel 68 0 1 68 4 2 68 8 3 68 12 4 68 16 5 68 20 6 68 24 7 68 28 8 Name Min Max Mean DEPT 10615.5 11396 11005.8 GR 25.6686 188.651 84.1783 RPX 6.5492 23.4241 13.336 RPS 8.4301 23.7044 14.5435 RPM 8.8439 22.1864 14.2028 RPD 9.46 21.7123 14.6886 ROP 1.9152 464.941 60.5554 FET 0.7194 9.2493 2.76708 First Last Nsam Reading Reading 1562 10615.5 11396 1455 10615.5 11342.5 1454 10623 11349.5 1454 10623 11349.5 1454 10623 11349.5 1454 10623 11349.5 1452 10670.5 11396 1364 10668 11349.5 First Reading For Entire File .......... 10615.5 Last Reading For Entire File ........... 11396 File Trailer Service name ............. STSLIB.007 Service Sub Level Name... Version Number ........... 1.0.0 Date of Generation ....... 98/12/01 Maximum Physical Record..65535 File Type ................ LO Next File Name ........... STSLIB.008 Physical EOF File Header Service name ............. STSLIB.008 Service Sub Level Name... Version Number ........... 1.0.0 Date of Generation ....... 98/12/01 Maximum Physical Record..65535 File Type ................ LO Previous File Name ....... STSLIB.007 Comment Record FILE HEADER FILE NUMBER: 8 RAW MWD Curves and log header data for each bit run in separate files. BIT RUN N-LTMBER: 7 DEPTH INCREMENT: .5000 FILE SUMMARY VENDOR TOOL CODE START DEPTH STOP DEPTH GR 11343.0 11429.0 FET 11350.0 11436.0 RPD 11350.0 11436.0 RPM 11350.0 11436.0 RPS 11350.0 11436.0 RPX 11350.0 11436.0 ROP 11396.5 11472.0 $ LOG HEADER DATA DATE LOGGED: SOFTWARE SURFACE SOFTWARE VERSION: DOWNHOLE SOFTWARE VERSION: DATA TYPE (MEMORY OR REAL-TIME): TD DRILLER (FT) : TOP LOG INTERVAL (FT): BOTTOM LOG INTERVAL (FT) : BIT ROTATING SPEED (RPM) : HOLE INCLINATION (DEG MINIMUM ANGLE: MAXIMI/MANGLE: 20-JTJL-98 5.07 5.46 MEMORY 11472.0 11396.0 11472.0 95.2 96.2 TOOL STRING (TOP TO BOTTOM) VENDOR TOOL CODE TOOL TYPE DGR DUAL GAMMA RAY EWR4 ELECTROMAG. RESIS. 4 $ TOOL NUMBER P1047GR4 P1047GR4 BOREHOLE ~LND CASING DATA OPEN HOLE BIT SIZE (IN): DRILLER'S CASING DEPTH (FT) : 6.000 6.0 BOREHOLE CONDITIONS MUD TYPE: MUD DENSITY (LB/G): MUD VISCOSITY (S) : MUD PH: MUD CHLORIDES (PPM) : FLUID LOSS (C3) : RESISTIVITY (OHMM) AT TEMPERATURE (DEGF) MUD AT MEASURED TEMPERATURE (MT): MUD AT MAX CIRCULATING TERMPERATURE: MUD FILTR3kTE AT MT: MUD CD3[E AT MT: QUIK DRILN 8.70 75.0 8.6 19500 4.5 .080 .050 .230 .320 56.1 NEUTRON TOOL MATRIX: MATRIX DENSITY: HOLE CORRECTION (IN): TOOL STANDOFF (IN): EWR FREQUENCY (HZ): REMARKS~ $ Data Format Specification Record Data Record Type .................. 0 Data Specification Block Type ..... 0 Logging Direction ................. Down Optical log depth units ........... Feet Data Reference Point .............. Undefined Frame Spacing ..................... 60 .lin Max frames per record ............. Undefined Absent value ...................... -999.25 Depth Units ....................... Datum Specification Block sub-type...0 .0 Name Service Order Units Size Nsam Rep DEPT FT 4 1 68 GR MWD 7 API 4 1 68 RPX MWD 7 OHMM 4 1 68 RPS MWD 7 OHMM 4 1 68 RPM MWD 7 OHMM 4 1 68 RPD MWD 7 OHMM 4 1 68 ROP MWD 7 FT/H 4 1 68 FET MWD 7 HOUR 4 1 68 Code Offset Channel 0 1 4 2 8 3 12 4 16 5 20 6 24 7 28 8 Name Min Max Mean DEPT 11343 11472 11407.5 GR 109.895 235.897 127.431 RPX 3.952 9.3803 6.66509 RPS 5.5748 11.0105 8.19292 RPM 6.0573 11.2043 8.80186 RPD 6.8818 10.8 9.08831 ROP 5.8136 926.628 45.6654 FET 2.8626 35.2055 20.0174 Nsam 259 173 173 173 173 173 152 173 First Reading 11343 11343 11350 11350 11350 11350 11396.5 11350 Last Reading 11472 11429 11436 11436 11436 11436 11472 11436 First Reading For Entire File .......... 11343 Last Reading For Entire File ........... 11472 File Trailer Service name ............. STSLIB.008 Service Sub Level Name... Version Number ........... 1.0.0 Date of Generation ....... 98/12/01 Maximum Physical Record..65535 File Type ................ LO Next File Name ........... STSLIB.009 Physical EOF File Header Service'name ............. STSLIB.009 Service Sub Level Name... Version Number ........... 1.0.0 Date of Generation ....... 98/12/01 Maximum Physical Record..65535 File Type ................ LO Previous File Name ....... STSLIB.008 Comment Record FILE HEADER · FILE NUMBER: 9 RAW MAD Curves and log header data for each pass of each run in separate files. DEPTH INCREMENT: .5000 MAD RUN NUMBER: 6 MAD PASS NUMBER: FILE SUMMARY VENDOR TOOL CODE START DEPTH STOP DEPTH GR 10457 . 0 11325 . 5 RPD 10463.0 11333.0 RPM 10463 . 0 11333 . 0 RPS 10463.0 11333.0 RPX 10463.0 11333.0 RAT 10521.0 11379.5 FET 10665.5 11333.0 $ LOG HEADER DATA DATE LOGGED: 18 - JTJL - 98 SOFTWARE SURFACE SOFTWARE VERSION: 5.07 DOWN-HOLE SOFTWARE VERSION: 5.46 DATA TYPE (MEMORY OR RE~_L-TIME) : MEMORY TD DRILLER (FT) : 11396.0 TOP LOG INTERVAL (FT) : 10668.0 BOTTOM LOG INTERVAL (FT) : 11396.0 BIT ROTATING SPEED (RPM) : HOLE INCLINATION (DEG MINIMUM ANGLE: 86.1 MAXIMUM ANGLE: 95.6 TOOL STRING (TOP TO BOTTOM) VENDOR TOOL CODE TOOL TYPE TOOL NUMBER DGR DUAL GAMMA RAY P1047GR4 EWR4 ELECTROMAG. RESIS. 4 P1047GR4 $ BOREHOLE AND CASING DATA OPEN HOLE BIT SIZE (IN): 6.000 DRILLER'S CASING DEPTH (FT) : 6.0 BOREHOLE CONDITIONS MUD TYPE: MUD DENSITY (LB/G): MUD VISCOSITY (S) : MUD PH: MUD CHLORIDES (PPM): FLUID LOSS (C3): RESISTIVITY (OHMM) AT TEMPERATURE (DEGF) MUD AT MEAS~D TEMPERATURE (MT): MUD AT MAX CIRCULATING TERMPERATURE: MUD FILTRATE AT MT: MUD CAKE AT MT: NEUTRON TOOL MATRIX: MATRIX DENSITY: HOLE CORRECTION (IN): TOOL STANDOFF (IN): EWR FREQUENCY (HZ): REMARKS: $ Data Format Specification Record Data Record Type .................. 0 Data Specification Block Type ..... 0 Logging Direction ................. Down Optical log depth units ........... Feet Data Reference Point .............. Undefined Frame Spacing ..................... 60 .liN Max frames per record ............. Undefined Absent value ...................... -999.25 Depth Units'. ...................... Datum Specification Block sub-type...0 QUIK DRILN 8.70 72.0 8.6 19000 5.0 .090 .186 .190 .160 .0 Name Service Order Units Size Nsam Rep Code Offset Channel DEPT FT 4 1 68 0 1 GR MAD 6 API 4 1 68 4 2 RPX MAD 6 OHMM 4 1 68 8 3 RPS MAD 6 OHMM 4 1 68 12 4 RPM MAD 6 OHMM 4 1 68 16 5 RPD MAD 6 OHMM 4 1 68 20 6 RAT MAD 6 FT/H 4 1 68 24 7 FET MAD 6 HOUR 4 1 68 28 8 61.1 First Name Min Max Mean Nsam Reading DEPT 10457 11379.5 10918.2 1846 10457 GR 15.3187 215.224 75.6355 1738 10457 RPX 3.5467 18.4688 10.4932 1741 10463 RPS 4.0231 27.9701 12.3705 1741 10463 RPM 4.509 40.4745 12.7542 1741 10463 RPD 5.6758 28.41 13.4949 1741 10463 RAT 317.821 639.164 472.068 1718 10521 Last Reading 11379.5 11325.5 11333 11333 11333 11333 11379.5 FET 6.0701 46.3845 32.594 1336 10665.5 11333 First Reading For Entire File .......... 10457 Last Reading For Entire File ........... 11379.5 File Trailer Service name ............. STSLIB.009 Service Sub Level Name... Version Number ........... 1.0.0 Date of Generation ....... 98/12/01 Maximum Physical Record..65535 File Type ................ LO Next File Name ........... STSLIB.010 Physical EOF Tape Trailer Service name ............. LISTPE Date ..................... 98/12/01 Origin ................... STS Tape Name ................ UNKNOWN Continuation Number ...... 01 Next Tape Name ........... UNKNOWN Comments ................. STS LIS Writing Library. Services Reel Trailer Service name ............. LISTPE Date ..................... 98/12/01 Origin ................... STS Reel Name ................ UNKNOWN Continuation Number ...... 01 Next Reel Name ........... UNKNOWN Comments ................. STS LIS Writing Library. Services Scientific Technical Scientific Technical Physical EOF Physical EOF End Of LIS File