Alaska Logo
Department of Commerce, Community, and Economic Development
Alaska Oil and Gas Conservation
Commission
Loading...
HomeMy WebLinkAbout203-193MEMORANDUM State of Alaska Alaska Oil and Gas Conservation Commission DATE:Thursday, April 4, 2024 SUBJECT:Mechanical Integrity Tests TO: FROM:Bob Noble P.I. Supervisor Petroleum Inspector NON-CONFIDENTIAL Hilcorp Alaska, LLC F-88 MILNE PT UNIT F-88 Jim Regg InspectorSrc: Reviewed By: P.I. Suprv Comm ________ JBR 04/04/2024 F-88 50-029-23185-00-00 203-193-0 W SPT 6860 2031930 1715 2218 2220 2219 2220 243 434 429 422 4YRTST P Bob Noble 2/10/2024 30 MinPretestInitial15 Min Well Name Type Test Notes: Interval P/F Well Permit Number: Type Inj TVD PTD Test psi API Well Number Inspector Name:MILNE PT UNIT F-88 Inspection Date: Tubing OA Packer Depth 306 1850 1818 1812IA 45 Min 60 Min Rel Insp Num: Insp Num:mitRCN240211124809 BBL Pumped:1.8 BBL Returned:1.8 Thursday, April 4, 2024 Page 1 of 1          • MEMORANDUM State of Alaska Alaska Oil and Gas Conservation Commission DATE: Friday,February 26,2016 TO: Jim Regg P.I.Supervisor l Z q /(e SUBJECT: Mechanical Integrity Tests HILCORP ALASKA LLC F-88 FROM: Jeff Jones MILNE PT UNIT KR F-88 Petroleum Inspector Src: Inspector Reviewed By!:t�, P.I.Supry\-L: --- NON-CONFIDENTIAL Comm Well Name MILNE PT UNIT KR F-88 API Well Number 50-029-23185-00-00 Inspector Name: Jeff Jones Permit Number: 203-193-0 Inspection Date: 2/19/2016 Insp Num: mitJJ160221075453 Rel Insp Num: Packer Depth Pretest Initial 15 Min 30 Min 45 Min 60 Min F-88 - Type Inj W`1TVD 6860 - Tubing 578 582 579 - 578 - PTD 2031930 Type Testi SPT Test psis 1715 IA ( 370 1907 - 1882 - ( 1878 - Interval I4YRTST P/F P / OA 200 390 391 395 - Notes: 1.7 BBLS diesel pumped,one well inspected,no exceptions noted. SCANNED SEP 262016 Friday,February 26,2016 Page 1 of 1 A OIL AND GAS CONSERVATION COMMON REPORT OF SUNDRY WELL OPERATIONS SEP 1 3 201? 1. Operations Abandon U Repair Well L] Plug Perforations U Perforate U Performed: Alter Casing Alaska , I' a Pull Tubin lJfl . f r4O- M3SkJ g ❑ g❑ Stimulate - Frac ❑ Waiver ❑ Time xtensio Change Approved Program ❑ Operat. Shutdown❑ Stimulate - Other ❑ Re -enter Suspended Wel c /rage 2. Operator 4. Well Class Before Work: 5. Permit to Drill Number: Name: BP Exploration (Alaska), Inc Development Exploratory ❑ 203 -193 3. Address: P.O. Box 196612 Stratigraphic❑ Service 0 6. API Number: Anchorage, AK 99519 -6612 50- 029 - 23185 -00 -00 7. Property Designation (Lease Number): sin 8. Well Name and Number: ' ADL0355017 r X550 y 9 1 J MPF -88 9. Logs (List logs and submit electronic and printed data per 20AAC25.071): 10. Field /Pool(s): To Be Submitted MILNE POINT, KUPARUK RIVER OIL 11. Present Well Condition Summary: Total Depth measured 12310 feet Plugs measured None feet true vertical 7331.74 feet Junk measured None feet Effective Depth measured 12222 feet Packer measured See Attachment feet true vertical 7258.39 feet true vertical See Attachment feet Casing Length Size MD TVD Burst Collapse Structural None None None None None None Conductor 80 20" 94# H-40 33 - 113 33 - 113 1530 520 Surface 7827 9 -5/8" 40# L -80 32 - 7859 32 - 4581.73 5750 3090 Intermediate None None None None None None Production 11897 7" 26# L -80 31 - 11928 31 - 7017.78 7240 5410 Liner 483 4 -1/2" 12.6# L -80 11827 - 12310 6936.95 - 7331.74 8430 7500 Perforation depth Measured depth 12034 - 12048 feet 12056 - 12075 feet 12081 - 12121 feet True Vertical depth 71 03.28 - 7114.68 feet 7121.21 - 7136.74 feet 7141.66 - 7174.55 feet Tubing (size, grade, measured and true vertical depth) 4 -1/2" 12.6# L -80 29 -11772 29 - 6892.96 Packers and SSSV (type, measured and true vertical depth) See Attachment See Attachment See Attachment Packer 4 -1/2" MCX I -SSV 2206 1979.16 SSSV 12. Stimulation or cement squeeze summary: q p Intervals treated (measured): _ � 1G, 12,034' - 12,048'; 12,056' - 12,075'; 12,081' - 12,121' b SEP �� Treatment descriptions including volumes used and final pressure: 4636 Gallons of EC9360A Surfactent, 21,004 Gallons EC9398A Polymer 13. Representative Daily Average Production or Injection Data Oil -Bbl Gas -Mcf Water -Bbl Casing Pressure Tubing Pressure Prior to well operation: 0 0 2945 0 1307 Subsequent to operation: 0 0 2987 0 1588 14. Attachments: 15. Well Class after work: Copies of Logs and Surveys Run Exploratory❑ Development ❑ Service Ill - Stratigraphic ❑ Daily Report of Well Operations X 16. Well Status after work: Oil ❑ Gas ❑ WDSPIU GSTOR ❑ WINJ ❑ WAG 151 GINJ ❑ SUSP ❑ SPLUC4J 17. I hereby certify that the foregoing is true and correct to the best of my knowledge. Sundry Number or N/A if C.O. Exempt: N/A Contact Garry Catron Prepared by Garry Catron 564 -4424 Printed Name Garry Catron Title PDC PE Signature At _v £ j Phone 564 -4424 Date 9/12/2012 13/3D MS SEP 14 20u (4419- ` G ,,P1/ Form 10-404 Revised 11/2011 6 l.ii v 1 \ V Submit Original Only • • Packers and SSV's Attachment ADL0355017 SW Name Type MD TVD Depscription MPF -88 SSSV 2206 1933.74 4 -1/2" MCX I -SSV MPF -88 PACKER 11731 6814.8 4 -1/2" Baker PRM Packer MPF -88 PACKER 11827 6891.53 5" Baker ZXP Top Packer Daily Report of Well Operations ADL0355017 ACTIVITYDATE 1 SUMMARY T /I /O = 1300/200/200 ** *Continued WSR from 08 -03- 2012 * ** Temp =Hot (Brightwater Reservoir Sweep Mod) Pumping brightwater chemicals down TBG while on water injection @ 3000 bwpd. Pumped 157 gal. EC9360A (Surfactant) Average of 12 gph for 13 hrs. Pumped a total of 157 gal. since start of project. Pumped 732 gal. EC9398A ( Polymer) Average of 56.3 gph for 13 hrs. Pumped a total of 732 gal. since start of project 8/4/2012 ** *Continued on WSR 08/05/2012 * ** • T /I /O = 1410/520/180 ** *Continued WSR from 08 -04- 2012 * ** Temp =Hot (Brightwater Reservoir Sweep Mod) Pumping brightwater chemicals down TBG while on water injection @ 3000 bwpd. Pumped xx gal. EC9360A (Surfactant) Average of xx gph for 24 hrs. Pumped a total of xx gal. since start of project. Pumped xx gal. EC9398A ( Polymer) Average of xx gph for 24 hrs. Pumped a total of xx gal. since start of project 8/5/2012 ** *Continued on WSR 08/06/2012 * ** T /I /O = 1410/520/180 ** *Continued WSR from 08 -04- 2012 * ** Temp =Hot (Brightwater Reservoir Sweep Mod) Pumping brightwater chemicals down TBG while on water injection @ 3000 bwpd. Pumped 328 gal. EC9360A (Surfactant) Average of 13.6 gph for 24 hrs. Pumped a total of 485 gal. since start of project. • Pumped 1367 gal. EC9398A ( Polymer) Average of 56.95 gph for 24 hrs. Pumped a total of 2099 gal. since start of project 8/5/2012 ** *Continued on WSR 08/06/2012 * ** T /I /O = 1459/520/180 ** *Continued WSR from 08 -05- 2012 * ** Temp =Hot (Brightwater Reservoir Sweep Mod) Pumping brightwater chemicals down TBG while on water injection @ 3000 bwpd. Pumped 278 gal. EC9360A (Surfactant) Average of 11.6 gph for 24 hrs. Pumped a total of 763 gal. since start of project. Pumped 1520 gal. EC9398A ( Polymer) Average of 63 gph for 24 hrs. Pumped a total of 3619 gal. since start of project 8/6/2012 ** *Continued on WSR 08/07/2012 * ** Daily Report of Well Operations ADL0355017 TIO = 1495/540/170 * ** Continued from 08 -06 -2012 WSR * ** Temp =Hot (Brightwater Reservoir Sweep Mod) Pumping brightwater chemicals down TBG while on water injection © 3000 bwpd. Pumped 326 gal. EC9360A (Surfactant) Average of 13.5 gph for 24 hrs. Pumped a total of 1089 gal. since start of project. Pumped 1419 gal. EC9378A ( Polymer) Average of 59.1 gph for 24 hrs. Pumped a total of 5038 gal. since start of project ** *Continued on 08 -08 -12 WSR * ** 8/7/2012 • TIO = 1490/540/175 Continued from 08 -07 -2012 WSR Temp =Hot (Brightwater Reservoir Sweep Mod) Started pumping brightwater chemicals down TBG while on water injection @ - 3000 bwpd. Pumped 329 gal. EC9360A (Surfactant) Average of 13.7 gph for 24 hrs. Pumped a total of 1418 gal. since start of project. Pumped 1198 gal. EC9398A ( Polymer) Average of 49.9 gph for 24 hrs. Pumped a total of 6236 gal. since start of project 8/8/2012 ** *Job Continued on 08 -09 -12 WSR * ** T /I /O = 1510/540/180 ** *Continued WSR from 08 -08- 2012 * ** Temp =Hot (Brightwater Reservoir Sweep Mod) Pumping brightwater chemicals down TBG while on water injection @ 3000 bwpd. Pumped 314 gal. EC9360A (Surfactant) Average of 13 gph for 24 hrs. Pumped a total of 1732 gal. since start of project. • Pumped 1383 gal. EC9398A ( Polymer) Average of 57.6 gph for 24 hrs. Pumped a total of 7619 gal. since start of project. 8/9/2012 ** *Continued on WSR 08 -10- 2012 * ** T /I /O = 1530/540/180 ** *Continued WSR from 08 -09- 2012 * ** Temp =Hot (Brightwater Reservoir Sweep Mod) Pumping brightwater chemicals down TBG while on water injection © 3000 bwpd. Pumped 299 gal. EC9360A (Surfactant) Average of 12.4 gph for 24 hrs. Pumped a total of 2031 gal. since start of project. Pumped 1420 gal. EC9398A ( Polymer) Average of 59.1 gph for 24 hrs. Pumped a total of 9039 gal. since start of project. 8/10/2012 ** *Continued on WSR 08 -11- 2012 * ** Daily Report of Well Operations ADL0355017 T /I /O = 1537/550/180 * **Continued WSR from 08 -10- 2012 * ** Temp =Hot (Brightwater Reservoir Sweep Mod) Pumping brightwater chemicals down TBG while on water injection @ 3000 bwpd. Pumped 297 gal. EC9360A (Surfactant) Average of 12.3 gph for 24 hrs. Pumped a total of 2328 gal. since start of project. Pumped 1356 gal. EC9398A ( Polymer) Average of 56.5 gph for 24 hrs. Pumped a total of 10395 gal. since start of project. 8/11/2012 ** *Continued on WSR 08 -12- 2012 * ** T /I /O = 1535/550/175 ** *Continued WSR from 08 -11- 2012 * ** Temp =Hot (Brightwater Reservoir • Sweep Mod) Pumping brightwater chemicals down TBG while on water injection @ 3000 bwpd. Pumped 316 gal. EC9360A (Surfactant) Average of 13.1 gph for 24 hrs. Pumped a total of 2644 gal. since start of project. Pumped 1296 gal. EC9398A ( Polymer) Average of 54 gph for 24 hrs. Pumped a total of 11691 gal. since start of project. 8/12/2012 ** *Continued on WSR 08 -13- 2012 * ** T /I /O = 1564/550/180 ** *Continued WSR from 08 -12- 2012 * ** Temp =Hot (Brightwater Reservoir Sweep Mod) Pumping brightwater chemicals down TBG while on water injection @ 3000 bwpd. Pumped 313 gal. EC9360A (Surfactant) Average of 13 gph for 24 hrs. Pumped a total of 2957 gal. since start of project. Pumped 1476 gal. EC9398A ( Polymer) Average of 61.5 gph for 24 hrs. Pumped a total of • 13167 gal. since start of project. 8/13/2012 ** *Continued on WSR 08 -14- 2012 * ** T /I /O = 1575/550/180 ** *Continued WSR from 08 -13- 2012 * ** Temp =Hot (Brightwater Reservoir Sweep Mod) Pumping brightwater chemicals down TBG while on water injection @ 3000 bwpd. Pumped 278 gal. EC9360A (Surfactant) Average of 11.5 gph for 24 hrs. Pumped a total of 3235 gal. since start of project. Pumped 1430 gal. EC9398A ( Polymer) Average of 59.5 gph for 24 hrs. Pumped a total of 14597 9 j al. since start of project. 8/14/2012 ** *Continued on WSR 08- 15- 2012 * ** Daily Report of Well Operations ADL0355017 T /I /O = 1588/550/180 ** *Continued WSR from 08- 14- 2012* ** Temp =Hot (Brightwater Reservoir Sweep Mod) Pumping brightwater chemicals down TBG while on water injection @ 3000 bwpd. Pumped 285 gal. EC9360A (Surfactant) Average of 11.8 gph for 24 hrs. Pumped a total of 3520 gal. since start of project. Pumped 1322 gal. EC9398A ( Polymer) Average of 55 gph for 24 hrs. Pumped a total of 15919 gal. since start of project. 8/15/2012 ** *Continued on WSR 08 -16- 2012 * ** • T /I /O = 1607/550/180 ** *Continued WSR from 08 -15- 2012 * ** Temp =Hot (Brightwater Reservoir Sweep Mod) Pumping brightwater chemicals down TBG while on water injection @ 3000 bwpd. Pumped 275 gal. EC9360A (Surfactant) Average of 11.4 gph for 24 hrs. Pumped a total of 3795 gal. since start of project. Pumped 1394 gal. EC9398A ( Polymer) Average of 58 gph for 24 hrs. Pumped a total of 17313 gal. since start of project. 8/16/2012 ** *Continued on WSR 08 -17- 2012 * ** T /I /O = 1619/550/180 ** *Continued WSR from 08 -16- 2012 * ** Temp =Hot (Brightwater Reservoir Sweep Mod) Pumping brightwater chemicals down TBG while on water injection @ 3000 bwpd. Pumped 289 gal. EC9360A (Surfactant) Average of 12 gph for 24 hrs. Pumped a total of 4048 gal. since start of project. Pumped 1434 gal. EC9398A ( Polymer) Average of 59.75 gph for 24 hrs. Pumped a total • of 18747 gal. since start of project. 8/17/2012 ** *Continued on WSR 0 -8 -18- 2012 * ** T /I /O = 1623/550/180 ** *Continued WSR from 08 -17- 2012 * ** Temp =Hot (Brightwater Reservoir Sweep Mod) Pumping brightwater chemicals down TBG while on water injection @ 3000 bwpd. Pumped 305 gal. EC9360A (Surfactant) Average of 12.7 gph for 24 hrs. Pumped a total of 4389 gal. since start of project. Pumped 1356 gal. EC9398A ( Polymer) Average of 56.5 gph for 24 hrs. Pumped a total of 20103 gal. since start of project. 8/18/2012 ** *Continued on WSR 08 -19- 2012 * ** Daily Report of Well Operations ADL0355017 T /I /O = 1627 /550 /180 ``**Continued WSR from 08- 18- 2012 * ** Temp =Hot (Brightwater Reservoir Sweep Mod) Pumping brightwater chemicals down TBG while on water injection @ 3000 bwpd. Pumped 247 gal. EC9360A (Surfactant) Average of 12.6 gph for entire job. Pumped a total of 4636 gal. since start of project. Pumped 901 gal. EC9398A ( Polymer) Average of 57.5 gph for entire job. Pumped a total of 21004 gal. since start of project. • 8/19/2012 FWHP = 1550/550/180 SW= CLOSED SSV, MV, WV =OPEN IA,OA =OTG * ** Job Complete * ** • • Tree:4 1/6" Cameron a MPF_88i Wellhead: FMC 11" gen 5 casing Orig. KB Elev. = 45.20' hanger. FMC 11" x 4.5" gen 5 tubing Orig. RT - LDS Elev. = 29.10' hanger. 4.5" BPV. TC -ll Landing thread Well required to have a SSSV installed, Surface casing 20", 94 ppf, H -80 1 112' I MCX) 4.5" HES X Nipple ( 3.813 ") 1 2206' I 9 - 5/8" 40#, L - 80, BTC ( 7859' / , KOP 7 degrees @ 480' Max. hole angle = 65 deg @ 5820' Hole angle thru' perfs = 23 deg 4.5 ", 12.6 ppf, L-80, lBT Tbg and Lnr (drift ID = 3.833, cap = .0152) 7 ", 26#, L -80, BTC Casing (drift ID = 6.151, cap.= .0383 bpf) 4.5" HES X- Nipple (3.813 ") 11720' 7" x 4.5" Baker Premier Packer I 11731' 4.5" HES XN- Nipple 3.813" Pkg. (No -Go 3.725" id) • 4.5" HES XN - Nipple I 11758' (3.813 pkg bore X No -Go 3.725" id) 4.5" WLEG bottom ( 11770' Perforation Summary ELMD 1/11/04 11772' SWS Slim Cement bond log dated Size SPF Interval (TVD) 7" x 5" Baker Lnr Tie Bads Sleeve Kup A3 Sands (5.25 ID) 111820'1 3 -3/8" 6 12,034' - 12,048' 7,103' - 7,114' 7" x 5" Baker ZXP Lnr Top Pkr 1118271 Kup A2 Sands (4.42" Min ID) 3 -3/8" 6 12,056' - 12,075' 7,121' - 7,136' Ku p Al Sands 7" x 5" Baker Flex Lock Lnr Hgr 111834' 1 3-3/8" 6 12,101` - 12,121' 7,141` - 7,174' (4.42" Min ID) 7" Halliburton Float Collar 11844' 7" Halliburton Float Shoe 11928' 4 1/2" Baker Landing Collar 12222' 4 1/2" Halliburton Float Collar 12265' 4 1/2" Halliburton Float Shoe 12310' DATE REV. BY COMMENTS 1/6/04 Lee Hulme Drill and completed by Doyon 14 MILNE POINT UNIT WELL No.: MPF -88i 02/16/04 MOO Add perfs for Cubbon API : 50- 029 - 23185 -00 BP EXPLORATION (AK) • • MEMORANDUM State of Alaska Alaska Oil and Gas Conservation Commission TO: DATE: Tuesday, March 27, 2012 Jim Regg P.I. Superviso I € t I v SUBJECT: Mechanical Integrity Tests BP EXPLORATION (ALASKA) INC F -88 FROM: Jeff Jones MILNE PT UNIT KR F -88 Petroleum Inspector Src: Inspector Reviewed By: P.I. Supry g'e NON - CONFIDENTIAL Comm Well Name MILNE PT UNIT KR F - 88 API Well Number 50 029 - 23185 - 00 - 00 Inspector Name: Jeff Jones Permit Number: 203 - 193 - Inspection Date: 3/6/2012 Insp Num: mitJJ120326183454 Rel Insp Num: Packer Depth Pretest Initial 15 Min 30 Min 45 Min 60 Min Well F-88 • Type Inj W `TVD 6860 • IA 457 2025 ' 2001 1997 - PTD 2031930 Type Test SPT Test psi 1715 OA 185 390 - 380 370 - Interval 4YRTST - IP/F P Tubing 1166 1170 ' 1167 1166 - N Initial MIT post rig work over. Tuesday, March 27, 2012 Page 1 of 1 • • /4Pu Regg, James B (DOA) �03- 9 From: AK, D &C Well Integrity Coordinator [ AKDCWeIIlntegrityCoordinator ©bp.com] Sent: Thursday, March 22, 2012 9:05 PM To: Regg, James B (DOA) 3 /Z 3 /Iz/ Cc: Brooks, Phoebe L (DOA) 1q Subject: RE: MITs Past Due Attachments: MIT ACT MPF -88 03- 06- 12.xls Jim, MPU F -88 (PTD #2031930) AOGCC witnessed MIT -IA was performed on 03/06/2012. MIT -IA form is attached. NS31 (PTD #2010600) is scheduled to be witnessed tomorrow. I will send in test results as soon as completed. Thank you, Mehreefz Vazir f4 /u ~rtct(c: Cieratd -tifirphvi Well Integrity Coordinator BP Alaska Drilling & Wells S�i�.h� `"' Well Integrity Office: 907.659.5102 Email: AKDCWeIIlntegrityCoordinator @BP.com � � _W_... From: Regg, James B (DOA) [mailto:jim.regg @alaska.gov] Sent: Thursday, March 22, 2012 5:48 PM To: AK, D &C Well Integrity Coordinator Subject: MITs Past Due As we discussed earlier today, I found several BPXA- operated wells with MITs that appear past due. Narrowed my initial list from 6 to just 2 wells: MPU F -88 (PTD 2031930); last MIT 3/7/08; due 3/7/12 Northstar -31 (PTD 2010600); last MIT 3/21/08; due 3/21/12 Jim Regg AOGCC 333 W. 7th Ave, Suite 100 Anchorage, AK 99501 907 - 793 -1236 1 • S STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMMISSION Mechanical Integrity Test Submit to: jim.regq(rDalaska.gov; doa. aogcc .Drudhoe.bav(a).alaska.gov; phoebe.brooks(cDalaska.gov; tom.maunder(rD.alaska.gov OPERATOR: BP Exploration (Alaska), Inc. 5f rev FIELD / UNIT / PAD: Milne Point/MPU /F -Pad 11 DATE: 03/06/12 OPERATOR REP: John Perl AOGCC REP: Jeff Jones Packer Depth Pretest Initial 15 Min. 30 Min. 45 Min. 60 Min. Well MPF -88 Type Inj. W TVD 6,860' Tubing _ 1166 1170 1167 1166 Interval 4 - P,T.D. 2031930 " Type test P Test psi 1715 Casing 457 2025 " 2001 1997 P/F P ' Notes: Took 1.7 bbls diesel to pressure up OA 185 390 380 370 Well Type Inj. TVD Tubing Interval P.T.D. Type test Test psi Casing P/F Notes: OA Well Type Inj. ND Tubing interval P.T.D. Type test Test psi Casing P/F Notes: OA Well Type Inj. TVD Tubing Interval P.T.D. Type test Test psi Casing P/F Notes: OA Well Type Inj. TVD Tubing Interval P.T.D., Type test Test psi Casing P/F Notes: OA TYPE INJ Codes TYPE TEST Codes INTERVAL Codes D = Drilling Waste M = Annulus Monitoring I = Initial Test G = Gas P = Standard Pressure Test 4 = Four Year Cycle I = Industrial Wastewater R = Internal Radioactive Tracer Survey V = Required by Variance N = Not Injecting A = Temperature Anomaly Survey T = Test during Workover W = Water D = Differential Temperature Test 0 = Other (describe in notes) Form 10 -426 (Revised 06/2010) MIT ACT MPF - 88 03 - 06 - 12 • . II bp BP Exploration (Alaska) Inc. Attn: Well Integrity Coordinator, PRB -20 Post Office Box 196612 Anchorage, Alaska 99519 -6612 December 30, 2011 Mr. Tom Maunder 3 - (G Alaska Oil and Gas Conservation Commission c), I ry 333 West 7 Avenue 'b Anchorage, Alaska 99501 Subject: Corrosion Inhibitor Treatments of MPF -Pad Dear Mr. Maunder, Enclosed please find multiple copies of a spreadsheet with a list of wells from MPF -Pad that were treated with corrosion inhibitor in the surface casing by conductor annulus. The corrosion inhibitor is engineered to prevent water from entering the annular space and causing external corrosion that could result in a surface casing leak to atmosphere. The attached spreadsheet represents the well name, API and PTD numbers, top of cement depth prior to filling and volumes of corrosion inhibitor used in each conductor. As per previous agreement with the AOGCC, this letter and spreadsheet serve as notification that the treatments took place and meet the requirements of form 10 -404, Report of Sundry Operations. If you require any additional information, please contact me or my alternate, Gerald Murphy, at 659 -5102. Sincerely, Mehreen Vazir BPXA, Well Integrity Coordinator III 11111 BP Exploration (Alaska) Inc. Surface Casing by Conductor Annulus Cement, Corrosion inhibitor, Sealant Top -off Report of Sundry Operations (10-404) MPF -Pad 10/29/2011 Corrosion Initial top of Final top of Cement top off Corrosion inhibitor/ Well Name PTD # API # cement Vol. of cement pumped cement date inhibitor sealant date ft bbls ft gal MPF -01 1950450 50029225520000 10.2 N/A 10.2 N/A 122.4 8/7/2011 MPF -02 1960700 50029226730000 4 N/A 4 N/A 35.7 8/8/2011 MPF -05 1970740 50029227620000 1.3 N/A 1.3 N/A 13.6 8/9/2011 MPF-06 1960020 50029226390000 1.2 N/A 1.2 N/A 15.3 8/2/2011 MPF-09 1971040 50029227730000 5.0 N/A 5.0 N/A 54.4 , 8/9/2011 MPF -10 1960940 50029226790000 1.7 N/A 1.7 N/A 20.4 8/2/2011 MPF -13 1950270 50029225490000 0.2 N/A 0.2 WA 8.5 10/6/2011 MPF -14 1952120 50029226360000 0.1 N/A 0.1 N/A 8.5 10/62011 MPF -17 1971960 50029228230000 4.1 N/A 4.1 N/A 37.4 8/6/2011 MPF -18 1961000 50029226810000 8.3 N/A 8.3 N/A 91.8 8/2/2011 MPF -21 1961350 50029226940000 1.8 N/A 1.8 N/A 15.3 8/6/2011 MPF -22 1952010 50029226320000 4 N/A 4 N/A 13.6 8/1/2011 MPF -25 1950160 50029225460000 0.3 N/A 0.3 N/A 6.8 10/29/2011 MPF -26 1970840 50029227670000 1.8 N/A 1.8 N/A 11.9 8/1/2011 MPF -29 1961170 50029226880000 6.7 N/A 6.7 N/A 56.1 8/9/2011 MPF -30 1951840 50029226230000 0.8 N/A 0.8 N/A 6.8 8/1/2011 MPF -33 2010620 50029226890000 23 Need top Job MPF -34 1971970 50029228240000 4.1 N/A 4.1 N/A 13.6 8/1/2011 MPF -37 1950250 50029225480000 0.2 N/A 0.2 N/A 8.5 10/6/2011 MPF -38 1951880 50029226140000 0.3 N/A 0.3 N/A 6.8 10/5/2011 MPF -41 1970950 50029227700000 0.8 N/A 0.8 N/A 8.5 8/9/2011 MPF-42 1970200 50029227410000 1.8 N/A 1.8 N/A 13.6 8/1/2011 MPF-45 1950580 50029225560000 8 N/A 8 N/A 78.2 8/11/2011 MPF-46 1940270 50029224500000 Sealed Conductor N/A N/A N/A N/A N/A MPF-49 1970030 50029227320000 2.3 N/A 2.3 N/A 18.7 8/11/2011 MPF -50 1970580 50029227560000 1.7 N/A 1.7 N/A 6.8 7/31/2011 MPF -53 1951080 50029225780000 2.8 N/A 2.8 N/A 11.9 9/19/2011 MPF -54 1961920 50029227260000 1.7 N/A 1.7 N/A 10.2 8/1/2011 MPF -57A 2031670 50029227470100 1.3 N/A 1.3 N/A 13.6 8/11/2011 MPF -58 1961560 50029227060000 1.7 N/A 1.7 N/A 13.6 7/31/2011 MPF-61 1951170 50029225820000 62 Need top job MPF -62 1951610 50029226090000 2.0 NN 2.0 N/A 13.6 9/1/2011 MPF-65 1970490 50029227520000 1.5 N/A 1.5 N/A 13.6 8/11/2011 MPF -66A 1961620 50029226970100 0.8 N/A 0.8 N/A 8.5 7/31/2011 MPF -69 1951250 50029225860000 0.8 N/A 0.8 N/A 8.5 8/4/2011 MPF -70 1951530 50029226030000 1.7 N/A 1.7 N/A 15.3 7/31/2011 MPF -73A 2001980 50029227440100 1.5 N/A 1.5 N/A 13.6 8/11/2011 MPF -74 1961080 50029226820000 1.7 N/A 1.7 N/A 13.6 7/31/2011 MPF -77 1951360 50029225940000 0.2 N/A 0.2 N/A 6.8 10/5/2011 MPF -78 1951440 50029225990000 0.7 N/A 0.7 N/A 5.1 7/312011 MPF -79 1971800 50029228130000 0.6 N/A 0.6 N/A 6.8 8/3/2011 MPF-80 1982170 50029229280000 0.5 N/A 0.5 N/A 3.4 , 8/3/2011 MPF -81 2000660 50029229590000 0.9 N/A 0.9 N/A 8.5 8/3/2011 MPF -82 2091350 50029229710000 1.7 WA 1.7 N/A 15.3 8/3/2011 MPF-83 2000930 50029229630000 1.2 WA 1.2 N/A 13.6 8/3/2011 MPF -848 2001760 50029229310200 1.2 N/A 1.2 N/A 10.2 8/3/2011 MPF-85 1982500 50029229360000 0.1 N/A 0.1 N/A 7.7 9/1/2011 MPF -86 2010870 50029230180000 0.8 N/A 0.8 N/A 6.8 8/12/2011 MPF -87A 2032130 50029231840100 1.3 N/A 1.3 N/A 11.9 8/132011 ""'---)." MPF -88 2031930 50029231850000 1.3 N/A 1.3 N/A 15.3 8/3/2011 MPF -89 2050900 50029232680000 1.2 N/A 1.2 N/A 10.2 8/3/2011 MPF -90 2012110 50029230510000 1.8 N/A 1.8 N/A 18.7 8/3/2011 MPF -91 2051100 50029232710000 1.7 WA 1.7 N/A 11.9 8/13/2011 MPF -92 1981930 50029229240000 0.8 N/A 0.8 N/A 5.1 8/13/2011 MPF -93 2050870 50029232660000 0.3 N/A 0.3 N/A 7.7 9/1/2011 MPF -94 2011700 50029230400000 1.8 N/A 1.8 N/A 13.6 8/13/2011 MPF -95 1981790 50029229180000 0.5 WA 0.5 N/A 3.4 8/13/2011 MPF -96 2081860 50029234060000 0.1 N/A 0.1 N/A 6.0 9/12011 MPF -99 2061560 50029233320000 1.3 N/A 1.3 N/A 11.9 _ 8/11/2011 • ~._. ~~~-_ -~ ' • ~ 03~0~ zoos DO NOT PLACE _~ .. ~~ ANY NEW MATERIAL UNDER THIS PAGE F:1LaserFiche\C~rPgs_Inserts\Microfilm Marker.doc "-- . . WELL LOG TRANS MITT AL To: State of Alaska Alaska Oil and Gas Conservation Comm. Attn.: Librarian 333 West ih Ave., Suite 100 Anchorage, Alaska 99501 February 16, 2006 /354/ RE: MWD Formation Evaluation Logs MPF-88, The technical data listed below is being submitted herewith. Please address any problems or concerns to the attention of: Rob Kalish, Sperry Drilling Services, 6900 Arctic Blvd., Anchorage, AK 99518 907-273-3500 MPF-88: LAS Data & Digital Log Images: 50-029-23185-00 :J-03~ Ic;!J 1 CD Rom ~~ [)} 98 I[)~ IÇMf;\V"~ DATA SUBMITTAL COMPLIANCE REPORT 2/6/2006 Permit to Drill 2031930 Well Name/No. MILNE PT UNIT KR F-88 Operator BP EXPLORATION (ALASKA) INC MD 12310 TVD Current Stat6~ ""'»"~""'""-."""""''-'" , 7332 Completion Date 2/15/2004 Completion Status WAGIN ~- REQUIRED INFORMATION Mud Log No Samples No Directional Survey Yes API No. 50-029-23185-00-00 E22. ----.--. DATA INFORMATION Types Electric or Other Logs Run: Well Log Information: MWD, GR, RES, PWD. IFRlCASANDRA (data taken from Logs Portion of Master Well Data Maint Log/ Data Type r ~ ~t I\!;'D ~~D 4+- I": I Electr Digital Dataset Med/Frmt Number Name Log Log Scale Media Run No Interval OH / Start Stop CH . Received Comments Directional Survey 0 12310 1/16/2004 Directional Survey 0 12310 1/16/2004 D -Ai,{; L' ) 12412 I nd uction/Resistivity 1-5 66 12261 2/19/2004 D AscLU 12412 Rate of Penetration 1-5 66 12261 2/19/2004 Induc.tiol./f1c3istivity t..-; f ¿f~vj:L /...f/t- 1-5 66 12261 2/19/2004 R~ràtion 1-5 66 12261 2/19/2004 See Nates"" (<....,.J- £\1 ~ 5 Blu 0 12210 9/22/2004 Well Cores/Samples Information: Name Interval Start Stop Sample Set Number Comments Sent Received ADDITIONAL INFORMATION Well Cored? ~ Chips Received? ~ Daily History Received? G) ~(5N Formation Tops Analysis Received? .:!JJY -"-,.---.,-~-,.-_._-.----~-,.---~---,,~- - -~. --- -.---- _._--~_..~-~-~--~-~-~" Comments: l MWD GR, EWR4, ROP GR, EWR4, ROP GR, EWR4, ROP GR, EWR4, ROP REVISED-ULTRASONIC IMAGER LOG-USIT-A- I WITH PRIMARY D. EPTH I CONTROL . Permit to Drill 2031930 MD 12310 TVD 7332 ~-~"...~-~---~~- Compliance Reviewed By: _ DATA SUBMITTAL COMPLIANCE REPORT 2/6/2006 Well Name/No. MILNE PT UNIT KR F-88 Operator BP EXPLORATION (ALASKA) INC API No. 50-029-23185-00-00 Completion Date 2/15/2004 Completion Status WAGIN Current Status WAGIN UIC Y ~-_. --P- Date: . / ~ h&). ô't5 ¿;---c . . e e dQS-\'\·3> MECHANICAL INTEGRITY REPORT' , l -=>,'1, (" ~ O· '-1.' =?UD D.~.::::: l~v..2 ?IG 2El.'::;_S:':: \ /L\ -0'--\ OPER & FIELD ß Ç' \../\,\ ~ \?Òd'A. '\.:"Eil NUHJ3ER M? \=- - ~ ~ \ 'I"it::LL DATA TD: \d)\ O,MD.. 'l ~'-;)TVD j :?BTD: l d;)d) MD \~5~TVD Ca.s ir;g: .-, Shoe: l \~).ð' HD "10\ ~ TVD i DV: ~ ~ MD ~A. -TVD _:':ìe::-: l-{tr:1 Shoe: \d)\Ù MJ) "Y~~) TVD¡ :CP: \\~Ol·m 6C\"3L:~7D _;jO~:;g: ~\b Packer \\~~\ HI) TVD ¡See a.t \ \ ~~D :'ole Size 'ð\l~ ana ¿.}/'(. Perfs \d()"7,~ to \d\~\ :-::ECP.ÞJEC;'..L 1:NTEGRITI - PART /l ¡'_ililulus Press Test: ~Pd\J()Ò 15 min,)OûÙ j 30 mindOOÙ. Comments: ,~,3\;~~Çc~s 'b'1 C"0C...\L ~c ~CC~Cè... ~ I\O-o~' /' :-Œ:CHÞ-1'ECÞ..L INTEGRITY - PART 42 ~\<6bb\'> \ -> dCY~'~\ Cemenc Volumes:'. P-..mt. Liner <ö.S-~."J( i Csg s.~s~ ; DV \J~. Cwe -.¡01 to cover perfs ~'...)~\.c..\.{,,,-\C!c" .~~. ~ 0\\-<.. ~û\J"o...~~ð~";). ~ CVCU~\ \,\ð~ '--'-s "Ù~\"-- ~œ,<8, ~~=~' C>"'\Jë\l~\Ò~ Theoreeical TOC . Cement Bond Log (Yes or No) ~..:-~ In AOGCC File ,\.(t~ \/H'-OL\ CBL :=valuation, zone a.bove perfs I", ,--\\(~ ~\~, 6~ ~CCÓ ~ \àa~a "" ""'~"""'-~.... \\ ~ L ~ -Ç,;:,,.- \ \ "', r' f'\" <; ~\ð ~..\~c '\ <,Ü ~Gl\\c:,,,, Prociuction Log: Type ; Evaluation CONC,LUSIONS: ? ar:: : 2 : ? art t 1 : It e Alaska Oil and Gas Conservation Commission Safety Valve System Test Report Operator: BPX Operator Rep: Brian Bixby AOGCC Rep: Waived Submitted By: Date: 12/13/2005 UnitIFieldlPad: Alaska Consolidated TeamlMilne PointlMPF Separator psi: LPS HPS mD1 Well Permit Separ Set LIP Test Test Test Date Tested and or Oil, WAG, GINJ, Number Number PSI PSI Trip Code Code Code Passed Retest or SI GAS, CYCLE, SI MPF -88 2031930 4500 2500 2500 P P WAG Wells: 1 Components: 2 Failures: o Failure Rate: 0.00% Remarks: MPF-88 was recently put on gas injection. Witnessing was waived by Jeff Jones. Page 1 SVS MPU F 12-13-05 Misc..xls . '" >. .... . STATE OF ALASKA . ALASKA~L AND GAS CONSERVATION COMrJI!SION WELL COMPLETION OR RECOMPLETION REPORT AND LOG 1a. Well Status: 0 Oil o Gas o Plugged o Abandoned o Suspended o WAG 1b. Well Class: 20AAC 25.105 20AAC 25.110 o Development o Exploratory OGINJ !HI WINJ o WDSPL No. of Completions One Other o Stratigraphic Test !HI Service 2. Operator Name: 5. Date Comp., Susp., or Aband. 12. Permit to Drill Number BP Exploration (Alaska) Inc. 2/15/2004 ~ 203-193 3. Address: 6. Date Spudded 13. API Number -' P.O. Box 196612, Anchorage, Alaska 99519-6612 12/20/2003 50- 029-23185-00 4a. Location of Well (Governmental Section): 7. Date TD. Reached 14. Well Name and Number: Surface: 1/1/2004 > MPF-88i 2138' NSL, 2906' WEL, SEC. 06, T13N, R10E, UM 8. KB Elevation (ft): 15. Field 1 Pool(s): Top of Productive Horizon: KBE = 45.42' I Milne Point Unit 1 Kuparuk River 552' NSL, 3702' WEL, SEC. 30, T14N, R10E, UM ! Total Depth: 9. Plug Back Depth (MD+ TVD) Sands 695' NSL, 3638' WEL, SEC. 30, T14N, R10E, UM 12222 + 7258 Ft 4b. Location of Well (State Base Plane Coordinates): 10. Total Depth (MD+TVD) 16. Property Designation: Surface: x- 541656 . y- 6035589' Zone- ASP4 12310 + 7332 . Ft ADL 355017 TPI: x- 540774 y- 6044557 Zone- ASP4 11. Depth where SSSV set 17. Land Use Permit: Total Depth: x- 540837 . y- 6044700 . Zone- ASP4 N/A MD 19. Water depth, if offshore 20. Thickness of Permafrost 18. Directional Survey !HI Yes ONo N/A MSL 1800' (Approx.) 21. Logs Run: MWD , GR , PWD , RES, IFRlCASANDRA 2. CASING, LINER AND CEMENTING RECORD ......;~~~~~ iilJ ............ SETTING DEP1"AMD · SETTING I >EÞtATvO ~?i€i........ ................ REC()~[)S ii~ i \Alr, . GAAbË TOP I '='OTTOM lOP BOTTOM i 20" 92# H-40 34' 112' 34' 112' 42" ~60 sx Arctic Set (Approx.) 9-5/8" 40# L-80 35' 7859' 35'- 4582' 12-1/4" 762 sx Lite Crete, 225 sx Class 'G' 7" 26# L-80 32' 11928' 32' 7018' 8-3/4" 94 sx Class 'G' 4-1/2" 12.6# L-80 11820' 12310' 6931' 7332' 6-1/8" 85 sx Class 'G' 23. Perforations open to Production (MD + TVD of Top and 24. ·i·i '.. T.JBING·.... iii ii" i .··.·.i.ii··· Bottom Interval, Size and Number; if none, state "none"): SIZE DEPTH SET (MD) PACKER SET (MD) 4-1/2" Gun Diameter, 6 SPF 4-1/2", 12.6#, L-80 11770' 11731' MD TVD MD TVD 12ft i Abu:L ~t:,!\III;:NI ·.eTÞ~· i.... .......iiii 12034' - 12048' 7103' -7115' ii 12056' - 12075' 7121' -7137' DEPTH INTERVAL (MD) AMOUNT & KIND OF MATERIAL USED 12081' -12121' 7142' -7175' 2200' Freeze Protected with 77 Bbls of Diesel. 26. PRODUCTION TEST Date First Production: Method of Operation (Flowing, Gas Lift, etc.): February 23, 2004 Water Injection Date of Test Hours Tested PRODUCTION FOR Oll-Bsl GAs-McF WATER-Bsl CHOKE SIZE I GAS-Oil RATIO TEST PERIOD ... Flow Tubing Casing Pressure CALCULATED ... Oll-Bsl GAs-McF W A TER-BSl Oil GRAVITY-API (CORR) Press. 24-HoUR RATE 27. CORE DATA Brief description of lithology, porosity, fractures, apparent dips and presence of oil, gas or water (attach separate sheet, if necessary). Submit core chips; if none, stat~:'~q~~)':;;';;;'0 ~ :_:u;v~;~,;:~,~ ~\/;'. t' None"~' ~ ¡ 2. . I -'-. .~ '¡ -,:~Ù' ~ ORIGINAL ~ ,~-~,~:-,':-,,~,., ,~-_:::,~-~"...-",j Form 1 0-407 Revised 12/2003 CONTINUED ON REVERSE SIDE ~. r:t R;fA APR 0 2004 ~~' "'. '. 28. GEOLOGIC MARKERS NAME MD TVD SBF2-NA SBF21 SBF24-MF SBF1-NB SBF12 SBE4-NC SBE41 SBE3-ND SBE2-NE SBE1-NF TSBD-OA TKLB TKUP TKUB TKUA TKA3 TKA2 TKA1 TMLV 6652' 6676' 6706' 6730' 6743' 6758' 6776' 6805' 6852' 6958' 7019' 11757' 11809' 11986' 12031' 12038' 12056' 12084' 12159' 4031' 4043' 4057' 4068' 4075' 4082' 4090' 4104' 4126' 4177' 4207' 6881' 6923' 7064' 7101' 7107' 7121' 7144' 7206' 29. FORMATION TESTS Include and briefly summarize test results. List intervals tested, and attach detailed supporting data as necessary. If no tests were conducted, state "None". None 30. List of Attachments: Summary of Daily Drilling Reports, Surveys, Well Schematic Diagram, Post Rig Work Summary and a Leak-Off Integrity Summary Report. 31. I hereby certify that the foregoing is true and correct to the best of my knowledge. Signed .' 203-193 Technical Assistant Date ...~~).. Prepared By Name/Number: Sondra Stewman, 564-4750 Drilling Engineer: Matt Green, 564-5581 '-"'.' Title MPF-88i Well Number Permit No. / A roval No. INSTRUCTIONS GENERAL: This form is designed for submitting a complete and correct well completion report and log on all types of lands and leases in Alaska. ITEM 1a: Classification of Service Wells: Gas Injection, Water Injection, Water-Alternating-Gas Injection, Salt Water Disposal, Water Supply for Injection, Observation, or Other. Multiple completion is defined as a well producing from more than one pool with production from each pool completely segregated. Each segregated pool is a completion. ITEM 4b: TPI (Top of Producing Interval). ITEM 8: The Kelly Bushing elevation in feet above mean low low water. Use same as reference for depth measurements given in other spaces on this form and in any attachments. ITEM 13: The API number reported to AOGCC must be 14 digits (ex: 50-029-20123-00-00). ITEM 20: True vertical thickness. ITEM 22: Attached supplemental records for this well should show the details of any multiple stage cementing and the location of the cementing tool. ITEM 23: If this well is completed for separate production from more than one interval (multiple completion), so state in item 1, and in item 23 show the producing intervals for only the interval reported in item 26. (Submit a separate form for each additional interval to be separately produced, showing the data pertinent to such interval). ITEM 26: Method of Operation: Flowing, Gas Lift, Rod Pump, Hydraulic Pump, Submersible, Water Injection, Gas Injection, Shut-In, or Other (explain). ITEM 27: If no cores taken, indicate "None". ITEM 29: List all test information. If none, state "None". Form 10-407 Revised 12/2003 ORIGINAL Tree: 41/6" Cameron M PF -88i Wellhead: FMC 11" gen 5 casing hanger. FMC 11" x 4.5" gen 5 tubing hanger. 4.5" BP\I. TC-II Landing threads Surface casing 20",94 ppf, H-80 æ:Ð 9-5/8" 40#, L-80, BTC 17859' I 4.5", 12.6 ppf, L-80, 1ST Tbg and Lnr (drift 10 = 3.833, cap = .0152) 7", 26#, L-80, BTC Casing (drift ID = 6.151, cap.= .0383 bpf) 4.5" HES XN-Nipple 3.813" Pkg. (No-Go 3.725" id ) Peñoration Summary SWS Slim Cement bond log dated Size SPF Interval (TVO) Sands 12 - - Sands , , - Sands - - 7" Halliburton Float Collar 11844' 7" Halliburton Float Shoe 11928' DATE 1/6/04 REV. BY COMMENTS Lee Hulme Drill and completed by Doyon 14 Orig. KS Elev. = 45.20' Orig. RT - LOS Elev. = 29.10' 4.5" HES X-Nipple (3.813" ) I 2206' I KOP 7 degrees @ 480' Max. hole angle = 65 deg @ 5820' Hole angle thru' perfs = 23 deg 4.5" HES X-Nipple (3.813" ) I 11720' I 7" x 4.5" Baker Premier Packer 11731' I 4.5" HES XN-Nipple 11758' I (3.813 pkg bore X No-Go 3.725" id) 4.5" WLEG bottom 11770' I ELMD 1/11/04 I 11772' I 7" x 5" Baker Lnr Tie Back Sleeve (5.2510) 7" x 5" Baker ZXP Lnr Top Pkr (4.42" Min 10) 111820' I 111827' I 7" x 5" Baker Flex Lock Lnr Hgr (4.42" Min 10) 111834' I 4 1/2" Baker Landing Collar 4 1/2" Halliburton Float Collar 41/2" Halliburton Float Shoe 12222' 12265' 12310' MILNE POINT UNIT WELL No.: MPF-88i API: 50-029-23185-00 BP EXPLORATION (AK) '. BP EXPLORATION Page 1 of 7 Operations Summary Report Legal Well Name: MPF-88 Common Well Name: MPF-88 Spud Date: 12/20/2003 Event Name: DRILL +COMPLETE Start: 12/20/2003 End: 1/4/2004 Contractor Name: DOYON DRILLING INC. Rig Release: 1/4/2004 Rig Name: DOYON 14 Rig Number: , I __:.~~~J Code I NPT I I Date From - To Hours Phase I Description of Operations I -..-... -- . --...- .--..- .... ..........-. 12/19/2003 17:00 - 21 :00 4.00 MOB P PRE Move Rig from MPF-87, and spot it over MPF-88 Rig accept @ 2100 hrs 12/19/2003 21 :00 - 00:00 3.00 RIGU P PRE Nipple up diverter, load pipe shed with 5" drill pipe 12/20/2003 00:00 - 01 :30 1.50 RIGU P PRE load pipe shed with 5" drill pipe, change over to 5" tools 01 :30 - 02:30 1.00 RIGU P PRE Slip and cut drillline,service top drive 02:30 - 14:00 11.50 RIGU P PRE Picking up Pipe, 357 jts of pipe and stand in derrick, mixing spud mud 14:00 - 14:30 0.50 RIGU P PRE Mobilize BHA 14:30 - 15:30 1.00 DRILL P SURF Picking up Bit motor, 1 dc" HWP 15:30 - 16:30 1.00 BOPSUF P SURF Diverter test, Witness of test was wavier by Lou Grimaldi Aogcc, Pre-spud meeting with crews 16:30 - 17:00 0.50 DRILL P SURF Flood conductor and wash out ice to 112' 17:00 - 17:30 0.50 DRILL P SURF Spud well drill 112' to 165' with 375 GPM 60 rpms,Run Gyro survey 17:30 - 19:30 2.00 DRILL P SURF Picking up BHA 12.4 bit GVXIVC w/3-15 1-10 jets, 8" sperry drill with 1.5 bend,stab,float sub,8" GRlHCIM, 8" DM,hang off sub,UBHO sub,stab,3 flex DC, 19:30 - 00:00 4.50 DRILL P SURF Directional Drill 165' to 631' with 400 gpm, 1200 psi, 85 rpms, ART 1.67 AST 1.42 12/21/2003 00:00 - 15:00 15.00 DRILL P SURF Directional Drill 631' to 3068' with 500 gpm, 1620 psi, 85 rpms, 15:00 -16:30 1.50 DRILL P SURF Circ. Three bottoms up with 1620 psi, 500 gpm, 95 rpms 16:30 - 19:00 2.50 DRILL P SURF Pump out to 720' with full drilling rate 19:00 - 20:00 1.00 DRILL P SURF Trip to bottom, wash 90 ft. 20:00 - 00:00 4.00 DRILL P SURF Directional Drill 3068' to 3723' with 500 gpm, 1950 psi, 100 rpms, AST 4.83 ART 6.75 12/22/2003 00:00 - 04:30 4.50 DRILL P SURF Directional Drill 3723' to 4566' with 500 gpm, 2000 psi, 100 rpms 04:30 - 06:30 2.00 DRILL P SURF Circ, Three bottoms with 100 rpm, 1900 psi, 500 GPM 06:30 - 09:00 2.50 DRILL P SURF Pump out to HWDP with full drilling rate 09:00 - 11 :00 2.00 DRILL P SURF Stand back BHA, change out bit, change motor bend to 1.15, pulse test MWD 11:00-12:30 1.50 DRILL P SURF Trip in hole, wash 90 ft to bottom 12:30 - 00:00 11.50 DRILL P SURF Directional Drill 4566' to 6286' with 500 gpm, 2000 psi, 120 rpms AST 1.67, ART 9.5 12/23/2003 00:00 - 17:30 17.50 DRILL P SURF Directional Drill 6286' to 7870' - TD. 12.25" hole - WOB 40K to 43K - RPM 120 - TQ on 16K - off 15K - GPM 500 - PP on 2300 - off 2000 - PU 195K - SO 11 OK - ROT 137K 17:30 - 21:30 4.00 DRILL P SURF CBU 3 X - GPM 500 - PP 2000 - RPM 120 - TQ 15K- 21 :30 - 00:00 2.50 DRILL P SURF Pump out from 7870' to 4480' - GPM 460 - 12/24/2003 00:00 - 01 :30 1.50 DRILL P SURF RIH from 4480' to 7800' - Precautionary wash / ream from 7800' to 7870' 01 :30 - 05:30 4.00 DRILL P SURF CBU 3 X - GPM 500 - PP 2000 - RPM 120 - TQ 15K 05:30 - 09:30 4.00 DRILL P SURF Pump out from 780' to HWT - Drilling rate 453 gpm - Hole in good condition 09:30 - 11 :00 1.50 DRILL P SURF Stand back HWT - Lay down BHA - Clear rig floor 11:00 - 13:30 2.50 CASE P SURF Rig up to run 95/8" 40# casing - Download MWD - Load pipe shed with casing - PJSM 13:30 - 14:30 1.00 CASE P SURF Make up shoe - Float collar with baffle - Howco latch collar - 1 joint 9 5/8" casing - circ thru same 14:30 - 00:00 9.50 CASE P SURF RIH to 7721' - Ran 190 joints 9 5/8" 40# - L80 - BTC casing - Break circulation and circulate 1 bottoms up staging in hole from 2200' to 2400' @ 5 bpm - (thick mud - not getting proper displacement on returns) 250 psi - Break circ while running in e .' Printed: 1/5/2004 9:11:29AM Legal Well Name: Common Well Name: Event Name: Contractor Name: Rig Name: Page 2 of 7 BP EXPLORATION Operations Summary Report MPF-88 MPF-88 DRILL +COMPLETE DOYON DRILLING INC. DOYON 14 Start: Rig Release: Rig Number: Spud Date: 12/20/2003 End: 1/4/2004 12/20/2003 1/4/2004 Date I i From - To Hours Task Code I NPT Phase I _...._._..__._-~-_. .-------- 12/24/2003 14:30 - 00:00 12/25/2003 00:00 - 01 :00 9.50 CASE P SURF 1.00 CASE P SURF 01 :00 - 03:00 2.00 CASE P SURF 03:00 - 05:00 2.00 CEMT N WAIT SURF 05:00 - 06:00 1.00 CEMT P SURF 06:00 - 09:00 3.00 CEMT P SURF 09:00 - 10:30 10:30 - 12:30 12:30 - 13:30 1.50 CEMT P SURF 2.00 CEMT P SURF 1.00 CEMT P SURF 13:30 - 16:00 2.50 CEMT P SURF 16:00 - 17:00 1.00 CASE SURF 17:00 - 18:00 1.00 BOPSU SURF 18:00 - 20:00 2.00 BOPSU SURF 20:00 - 21 :00 1.00 BOPSU SURF 21 :00 - 00:00 3.00 BOPSU SURF 12/26/2003 00:00 - 00:30 0.50 BOPSU P SURF 00:30 - 01 :00 0.50 CASE P SURF 01 :00 - 01 :30 0.50 CASE P SURF Description of Operations -. -" .....-......... hole @ 3800' - 5700' - 7700' - 5 bpm 300 psi - with no fluid losses Pick up Landing joint - Make up FMC hanger - Land casing - Rig down Franks fill up tool - Make up Schlumberger cementing head - Cementing lines - (Shoe depth 7859' - Float collar 7815' - Latch collar 7773' - H-ES Cementer 1935') Circulate / Condition mud for cement job Waiting on Schlumberger Dowell Cementing Crew and Equipment Rig up Shlumberger cement crew Held PJSM - Pump 10 bbls of CW1 00 chemical wash - Test lines to 4000 psi - Pump 10 bbls of CW1 00 chemical wash - Mixed and pumped 40 bbls 10.2 ppg Mud Push - kicked out dart with last 5 bbls of spacer - Loaded cementing head with top wiper dart - Mixed and pumped 535 sxs (424 bbls) 'Artic Set Lite", yield of 4.45 cftIsx at 10.7 ppg slurry - Followed by 225 sxs (46 bbls) Class 'G' Cement with a yield of 1.17 cftlsx mixed at 15.8 ppg slurry - Kicked out top dart with 30 bbls of water. Displaced cement with rig pumps at 8 bpm at 1000 psi. Cement contaminated mud and 50 bbls of good cement to surface. Slowed down to 3 bpm to bump plug and lost returns. Bumped plug at 10:07 hrs with 1500 psi. Checked floats - Bleed off pressure - Loaded head with closing plug. Pressure up on casing to 2800 psi and ES Cementer opened. Pump 5 bbls water - test lines to 4000 psi - pump 5 bbls water - mixed and pumped 31 bbls of 10.2 ppg Mud Push with red dye - mixed and pumped 227 sxs (180 bbls) 'Artic Set Lite' mixed at 10.7 ppg slurry. With 180 bbls of cement away observed red spacer at flowline. Kicked out shut off plug with 30 bbls of water. Displaced cement with rig pumps at 5 bpm at 340 psi. Bumped plug with 1500 psi at 1316 hrs. Recovered 80 bbls of good cement at surface. Rig down cementing lines - Schlumberger cement head - Back out landing joint - Flush Annular / flow line - Rig down casing equipment - Lay down all vendors tools Nipple down Riser - Divertor - Knife valve Nipple up FMC speed head - Orient annulus valves - Test M/M seal to 1000 psi for 10 mins Nipple up BOP's Install short bails - Elevators - Rig up testing equipment - Install test plug - Open annulus valves Test BOP's - Test Annular to 250 low - 2500 high - 5 mins each test - Test upper rams - Bottom rams - choke manifold - Hyd choke valve - Hyd Kill valve - Manual Choke valve - Manual Kill valve - Upper / Lower IBOP valves - Floor safety valves -To 250 low - 3500 high - 5 mins each test Con't testing BOP's - Koomey test - Test Blind rams to 250 low - 3500 high - for 5 mins each test - Attempt to notify AOGCC of BOP test three times - No return contact from AOGCC Rig down testing equipment - Pull test plug - Install long bowl protector - Close annulus valves Pick up BHA to rig floor - Steam connections Printed: 1/5/2004 9:11 :29 AM '. ..", ')' BP EXPLORATION Operations Summary Report Page 3 of 7 Legal Well Name: MPF-88 Common Well Name: MPF-88 Spud Date: 12/20/2003 Event Name: DRILL+COMPLETE Start: 12/20/2003 End: 1/4/2004 Contractor Name: DOYON DRILLING INC. Rig Release: 1/4/2004 Rig Name: DOYON 14 Rig Number: I From - To I Hours NPT I Phase I Date Task ¡Code Description of Operations ! n_ ."___ __n_ ______0" __ .._"._ .....--.--.... -.... --- -----..---- 12/26/2003 01 :30 - 03:00 1.50 CASE P SURF PU BHA - Make bit up to Motor - Motor set 1.22 - Make up MWD tools - Orient same - Con't make up BHA # 3 - Shallow pulse test tools 03:00 - 03:30 0.50 CASE P SURF RIH to 1900' - (Howco ES-Cementer @ 1935') - Break circulation - String reamer at 1765' 03:30 - 04:30 1.00 CASE P SURF Cut drilling line 04:30 - 05:30 1.00 DRILL P SURF Drill cement - Howco closing plug 05:30 - 08:30 3.00 DRILL P SURF RIH tag cement @ 7765' 08:30 - 09:30 1.00 DRILL P SURF Break circulation - Test casing to 2500 psi for 30 mins 09:30 - 11 :00 1.50 DRILL P SURF Drill cement - Float equipment - 20' new hole from 7870' to 7890' 11 :00 - 12:30 1.50 DRILL P SURF Displace well with new 8.9 ppg mud. 12:30 - 13:00 0.50 DRILL P SURF Preform FIT - TVD 4582 Mud weight 8.9 - Surface presure 620 = 11.5 EMW 13:00 - 20:30 7.50 DRILL P INT1 Directional Drill from 7890' to 8819' - WOB 15K - RPM 100- TQ on 18K - off 18K - GPM 525 - PP on 2300 - off 2170 - PU 215K - SO 115K - ROT 146K - ECD 10.8 - Losing mud over shakers running 500 gpm - sand plugging off screens 20:30 - 21 :30 1.00 DRILL N FLUD INT1 Circulate @ 350 to 400 gpm - Change Shaker screens on # 3 - From 125 /125 /125 to 150 /150 /150 - Change screens on # 4 from 100 /100 /100 to 180 /180 /180 - Transfering mud from rock washer to active system through shakers with Vac truck 21 :30 - 00:00 2.50 DRILL P INT1 Directional Drill from 8819' to 9196' - WOB 15K - RPM 100- TO on 15K - off 14K - GPM 500 - PP on 2330 - off 2030 - Pump rate increased to 600 GPM @ 9125' - PP on 2900 - off 2750 - ECD 11.3 12/27/2003 00:00 - 00:30 0.50 DRILL P INT1 Circulate to lower ECD from 11.4 to 10.9 - GPM 600 - RPM 100 - TO 14K 00:30 - 05:00 4.50 DRILL P INT1 Directional Drill from 9196' to 9766' - WOB 15K - RPM 100 - TQ 17K - off 16K - GPM 625 - PP on 3450 - off 3120 - PU 205- SO 120 - ROT 150 05:00 - 06:00 1.00 DRILL P INT1 Circulate to lower ECD from 11.5 to 11.1 - GPM 625 - RPM 100 - TO 17K 06:00 - 13:00 7.00 DRILL P INT1 Directional Drill from 9766' to 10612' - WOB 15K - RPM 120 - TO on 19K - off 20K - GPM 625 - PP on 3730 - off 3500 - PU 233 - SO 125 - ROT 155 13:00 - 14:00 1.00 DRILL P INT1 Circulate 1.5 CBU to lower ECD from 11.8 to 11.0 - GPM 625 - PP 3370 psi - RPM 120 - TO 17K 14:00 - 23:30 9.50 DRILL P INT1 Directional Drill from 10612' to 11403' - WOB 15K - RPM 120 - TQ on 18K - off 15K - GPM 625 - PP On 3880 - off 3610 - PU 230 - SO 145 - Rot 176 23:30 - 00:00 0.50 DRILL N DFAL INT1 CBU 3 X - MWD tool Failure - Circulate for trip - RPM 120 - TO 18K - GPM 625 - PP 3550 12/28/2003 00:00 - 01 :00 1.00 DRILL N DFAL INT1 CBU 2.5 X - For bit trip MWD failure - GPM 625 - PP 3600 - PU 230 - SO 145 - ROT 176 01 :00 - 02:00 1.00 DRILL N DFAL INT1 Monitor well - Well stable - Pump out to 9954' - 450 GPM - Hole in good condition 02:00 - 04:30 2.50 DRILL N DFAL INT1 Mad pass for Acoustic Caliper from 9954' to 9519' - GPM 625 - 3000 psi - RPM 80 - TO 13K 04:30 - 05:30 1.00 DRILL N DFAL INT1 Pull out from 9919' to 7850' - No Pump - Hole in good shape 05:30 - 06:00 0.50 DRILL N DFAL INT1 Flow check - Well stable - Pump dry job - Blow down top drive 06:00 - 08:30 2.50 DRILL N DFAL INT1 Con't POOH from 7850' to 5" HWT @ 733' Printed: 1/5/2004 9: 11 :29 AM '. , . BP EXPLORATION Operations Summary Report legal Well Name: Common Well Name: Event Name: Contractor Name: Rig Name: Date MPF-88 MPF-88 DRill +COMPlETE DOYON DRilLING INC. DOYON 14 From - To I Hours I I Task Code NPT - ____.__...__.__.. _n. .__.....~ ..__.... 12/28/2003 08:30 - 11 :00 2.50 DRILL N 11 :00 - 13:30 2.50 DRILL N 13:30 - 15:00 1.50 DRILL P 15:00 - 16:30 1.50 DRILL N 16:30 - 23:00 6.50 DRILL P 12/29/2003 12/30/2003 23:00 - 00:00 1.00 DRILL P 00:00 - 00:30 0.50 DRILL P 00:30 - 01 :30 1.00 DRILL P 01 :30 - 02:00 0.50 DRILL P 02:00 - 04:00 2.00 DRILL P 04:00 - 05:00 1.00 DRILL P 05:00 - 06:30 1.50 DRILL P 06:30 - 13:00 6.50 DRILL P 13:00 - 14:30 1.50 DRILL P 14:30 - 15:30 1.00 DRILL P 15:30 - 17:00 1.50 CASE P 17:00 - 00:00 7.00 CASE P 00:00 - 00:30 0.50 CASE P 00:30 - 01 :30 1.00 CASE P 01 :30 - 03:00 1.50 CASE P 03:00 - 03:30 0.50 CASE P 03:30 - 05:30 2.00 CASE P 05:30 - 07:00 1.50 CASE P Start: Rig Release: Rig Number: Phase DFAL INT1 DFAL INT1 INT1 DFAL INT1 INT1 INT1 INT1 INT1 INT1 INT1 INT1 INT1 INT1 INT1 INT1 INT1 INT1 INT1 INT1 INT1 INT1 INT1 INT1 07:00 - 07:30 0.50 CASE P INT1 07:30 - 10:00 2.50 CASE P INT1 10:00 - 12:00 2.00 CEMT P INT1 Page 4 of 7 12/20/2003 1/4/2004 Spud Date: 12/20/2003 End: 1/4/2004 Description of Operations --------_.~ ....- .-.-.. ."----...----- Stand back 5" HWT - Lay down ACAL / Down load MWD - Change out MWD - Orient - Shallow test MWD tools - RIH 5" HWT RIH from 733' to 7760' Cut drlg line - Service Top drive / Rig Con't RIH from 7760' to 11403' - Hole in good shape Directional Drill from 11403' to 11936' - T. D. 8 1/2" hole - WOB 15K - RPM 120 - TQ on 15K - off 18K - GPM 625 - PP on 3840 - off 3552 - PU 235 - SO 155 - ROT 190 CBU 2 X - GPM 625 - PP 3600 - RPM 120 - TQ 20K CBU - GPM 625 - RPM 120 - TQ 21 K - PP 3600 - PU 235 - SO 155 - ROT 190 Pump out from 11936 to 10892' - Full drlg rate - Hole good shape - RIH from 10892' to 11936' - Hole in good shape CBU 3 X - GPM 625 - RPM 120 - TQ 23k - PP ON 3600 - PU 235 - SO 155 - ROT 190 - Mon itor well POH - Pump out to 10892' - Pull without pump to 10300' - Monitor well - Well stable - Pump dry job POH - From 10300' to 9 5/8" casing shoe @ 7850' Lay down 5" Drill pipe Lay down BHA - Down load MWD - Con't lay down BHA Pull wear ring - Clear floor Rig up casing equipment to run 7" casing - Load 7" casing in pipe shed Pick up float equipment - Check floats - Run 7" 26# L-80 BTC-M casing to 7260' Run 7" 26# L-80 BTC-M casing from 7260 to 7830' Circulate casing volume 298 bbls - 7 bpm @ 1050 psi - 30% flow no losses RIH from 7830' to 10100' - At 9300' displacement short - slow running speed - Stop to break circulation Break circulation - Circulate one joint down - stage up to 6.8 bpm 1060 psi 22% flow - losing mud - slow rate to 5 bpm - slow pump to 4.5 bpm - level out - lost total 27 bbls Continue run 7" casing from 10100' to 11896' - displacement short - Pick up landing joint with 7" hanger - make up to 7" casing Break circulation @ 2 bpm - 900 psi - tag mandrell hanger on casing bowl - Reciprocate 7" casing string 20' strokes - staging up pump as hole will allow - PU 300 - SO 125 - Pump 2.7 bpm - 800 psi - loss 60 bbls Rig down Franks fill up tool - Make up Schlumberger cementing head - cement line - Gained 30 bls back CBU - Stage up pump from 2.7 bpm to 4.8 bpm - 850 psi -loss 5 bbls - Reciprocate 20' strokes - PU 298 - SO 125 Schlumberger pump 10 bbls CW 100 water - Test lines to 3500 psi - Pump 10 bbls CW 100 @ 5 bpm 295 psi - Pump 20 bbls Mud push spacer mixed @ 10.7 ppg - 5 bpm 300 psi - (Drop bottom plug last 5 bbls spacer on fly) - Pump 94 sxs Class "G" w / .3% D65 + .2% D800 + 3% D174 - Yield 1.2 cu ftIsx 20 bbls slurry mixed @ 15.8 ppg - 5 bpm - 250 psi - Drop top plug with 21 bbls of water -5 bpm 130 psi Give to Rig - Displace with rig - Printed: 1/5/2004 9:11 :29 AM · . Page 5 of 7 BP EXPLORATION Operations Summary Report Legal Well Name: MPF-88 Common Well Name: MPF-88 Event Name: DRILL +COMPLETE Contractor Name: DOYON DRILLING INC. Rig Name: DOYON 14 Date I From - To Hours I Task Code NPT! 12/20/2003 1/4/2004 Spud Date: 12/20/2003 End: 1/4/2004 Start: Rig Release: Rig Number: Phase I ... _.__1__ 12/30/2003 10:00 - 12:00 2.00 CEMT P 12:00 - 13:00 1.00 CASE P INT1 13:00 - 15:00 2.00 CASE P INT1 15:00 - 16:30 1.50 CASE P INT1 16:30 - 21 :00 4.50 CASE P INT1 21 :00 - 21 :30 0.50 CASE P INT1 21 :30 - 23:00 1.50 CASE P INT1 23:00.. 23:30 0.50 CASE P INT1 23:30 - 00:00 0.50 CASE P INT1 12/31/2003 00:00 - 02:00 2.00 CASE P INT1 02:00 - 03:30 1.50 CASE P INT1 03:30 - 04:30 1.00 CASE P INT1 04:30 - 08:30 4.00 CASE P INT1 08:30 .. 09:00 0.50 CASE P INT1 09:00 - 09:30 0.50 CASE P INT1 09:30 - 11 :30 2.00 CASE P INT1 11 :30 - 12:30 1.00 DRILL P PROD1 12:30.. 13:00 0.50 DRILL P PROD1 13:00 - 23:00 10.00 DRILL P PROD1 23:00 - 00:00 1.00 DRILL P PROD1 1/1/2004 00:00 - 01 :00 1.00 DRILL P PROD1 01 :00 - 03:30 2.50 DRILL P PROD1 03:30 - 05:00 1.50 DRILL P PROD1 05:00 - 05:30 0.50 DRILL P PROD1 05:30 - 17:00 11.50 DRILL P PROD1 17:00 .. 18:00 1.00 DRILL P PROD1 18:00 - 18:30 0.50 DRILL P PROD1 18:30 - 19:00 0.50 DRILL P PROD1 19:00 -19:30 0.50 DRILL P PROD1 INT1 Description of Operations 432 bbls mud 6.5 bpm @ 670 psi - Slow to 3 bpm bump plug with 1700 psi - 1000 psi over circulating pressure - Hold for 3 mins bleed off pressure - Floats holding - Reciprocate 7" 20' strokes while cementing / displacing - No loss while cementing and displacing Rig down cementing head - cementing lines.. clear floor .. monitor well Monitor well - Annulus flow - 1 st hr 9 bbls - 2nd hr 5 bbls - 3 rd hr 5 bbls Back out and lay down landing joint - Install 9 5/8" X 7" FMC pack-off - Test to 5000 psi for 10 mins.. good test Lay down 5" drill pipe from derrick Rig service top drive - Service skate Con't lay down 5" drill pipe from derrick Change out elevators from 5" to 4" Pick up 21 joints of 4" drill pipe - Stand back in derrick Change Top rams to 2 7/8" X 5" variable - Change out saver sub to from 5" to 4" Rig up to test BOP's - Install test plug - open annulus valve Replace Hydralic hose on stack - (HCR Choke valve) Test BOP's - Annular to 250 low 2500 high for 5 mins each test - Top / Btm rams - Choke manifold - HCR choke / Kill valves - Manual Choke / Kill valves - Upper / Lower IBOP valves - Floor safety valves- 250 low 3500 high for 5 mins each test .. Accumulator test.. AOGCC Jeff Jones waived witness of BOP test - Rig down testing equipment.. Pull test plug - Install wear ring - Close annulus valves Clear rig floor - Prepare to pick up 6 1/8" BHA Pick up BHA to rig floor - Pick up motor set at 1.22 degree - Make up bit - Pick up MWD tools - Orient same - Pick up 3 1/2" HWT 1 Hr Safety Stand down meeting with all rig personnel - Milne PT HSE Safety - Roads and Pad Supervisor - Field Manager- Asset Manager - ACS Enviromental .. Operations Manager - BP HSE Safety attended. Con't picking up 31/2" HWT TIH - Picking up 4" drill pipe from pipe shed - Filling every 75 joints - Circulate pipe volume on each fill up - RIH to 11750' Cut drilling line - Service Top drive - Rig Rig up to test 7" Casg - Test casg to 3500 .. For 30 mins .. Recorded on chart Drill cement - Float equipment from 11843' to 11928' .. 20' new hole from 11936' to 11956' Displace mud with new mud 9.8 ppg FIT - Mud weight 9.8 - Pressure 990 - TVD 7016 = 12.51 EMW Directional Drill from 11956' to 12310' - T.D. 6 1/8" Hole.. WOB 20K.. RPM 120 - TQ on 12K - off 14K - GPM 250 - PP on 2730 - off 2560 - PU 210K - SO 105K.. ROT 145K CBU 1.5 X.. RPM 120 - TQ 14K.. GPM 276 - PP 3000 POH from 12310' to 11850' .. No problems.. good condition Observe well .. well static RIH from 11850' to 12310' - Hole good condition Printed: 1/5/2004 9:11:29 AM , . BP EXPLORATION Operations Summary Report Legal Well Name: Common Well Name: Event Name: Contractor Name: Rig Name: Date From - To MPF-88 MPF-88 DRILL +COMPLETE DOYON DRILLING INC. DOYON 14 I _ ~_~.~~~.t_ Task Code Start: Rig Release: Rig Number: , i NPT ¡ Phase i - I _1____. _. _ ____ ____L.____._ DPRB PROD1 CBU 3 X - GPM 276 - PP 2820 - RPM 120 - TQ 14K - Lost returns - Shut down pump - well static - Attempt to circ @ 1.5 bpm - no returns - Loss 17 bbls - (Returns lost abruptly - No Indication of pack-off - No gas cut mud or oil in mud returns - Lost 300 psi with lost of returns) POH to shoe @ 11880' - 5 bbls to fill - 2.5 bbls over displacement Flow check well - 15 mins = 1 bblloss = 4 bph loss Pump dry job - Loss 24 bbls - POH for 4.5" liner POH to HWT - (12 bbls over displacement on trip out to HWT) Lay down 3 1/2" HWT - BHA- Clear floor - Rig up casing tools - PJSM running liner Pick up float joints - check floats - PU 4 1/2" liner - make up hanger - top packer - setting tool - RIH one stand 4" drill pipe - (457' of 41/2" L-80 12.6# IBT liner - Baker Flex Lock 7" x 5" hanger - 7" x 5" Liner top packer) Stageing in hole - Every 1500' interval reduce mud weight from 9.7 to 9.2 ppg - @ 11880' Pick up - make up - Baker cementing head - Lay down on skate Reduce mud weight from 9.7 to 9.2 ppg -stage pumps up from 2.5 bpm to 4 bpm - 840 psi - Full returns - no losses - PU 200 - SO 110 RIH from 11880'to 12300' Pick up Baker cementing head - attach cementing hose - Wash down / reverse hose Break circulation @ 2 bpm 500 psi - Tag bottom @ 12310'- Stage pump up to 4 bpm @ 880 psi - Circulate to reduce mud wt from 9.7 to 9.2 c PU 210 - SO 105 - Full returns Con't circulate - Reciprocate 15 strokes - reduce mud wt to 9.2 for liner cement job - 4 bpm 900 psi PU 205K - SO 11 OK Swap over to Schlumberger Dowell - Con't reciprocating 15' strokes - Pump 5 bbls CW 100 water - Test lines to 4000 pis - Pump 5 bbls CW 100 water - 20 bbls Mud Push mixed at 10.7 ppg - 4 bpm @ 850 psi - Batch mix 18.5 bbls 85 sxs Class 'G' cement with 2.0 gal/sx Gas Blok - yield 1.20 cu ftlsx mixed at 15.8 - Shut down wash out cement line with 10 bbls of fresh water - Drop dart displace with 129 bbls mud - pick up liner wiper plug - Con't displacing - bump plug 134.6 bbls - Pump rate 4 bpm - @ 900 psi - Pressure up to 4000 psi - set liner hanger /Iiner top packer - Bleed off pressure check floats - Pressure back up to 4000 psi - bleed off pressure - Rotate 20 turns to the right - Pressure up to 1000 psi - pick up 9' pressure fell off. Close Hydril - open choke - Reverse circulate 2 Drill pipe volumes - @ 7 bbls cement back Break down cementing hoses - Lay down 1 joint DP - Baker cementing head on skate - Monitor well - Well static Monitor well - Pump dry job - POH with Baker running tool - Break and lay down tool - Pick up and break Baker cementing head pups - XO's - Lay down head PU 2 7/8" handliing tools - Rig up stack tongs - PJSM Make up 3 3/4" mill- PU 14 joints 27/8" Drill pipe - XO- ----..-..... .~._.. 1/1/2004 19:30 - 21:30 2.00 DRILL N 21 :30 - 22:00 0.50 DRILL N DPRB PROD1 22:00 - 22:30 0.50 DRILL N DPRB PROD1 22:30 - 00:00 1.50 DRILL N DPRB PROD1 1/2/2004 00:00 - 02:00 2.00 DRILL N DPRB PROD1 02:00 - 03:00 1.00 DRILL N DPRB PROD1 03:00 - 04:00 1.00 DRILL N DPRB PROD1 04:00 - 05:30 1.50 DRILL N DPRB PROD1 05:30 - 20:00 14.50 DRILL N DPRB PROD1 20:00 - 20:30 0.50 DRILL N DPRB PROD1 20:30 - 22:00 1.50 DRILL N DPRB PROD1 22:00 - 22:30 0.50 DRILL N DPRB PROD1 22:30 - 23:00 0.50 DRILL N DPRB PROD1 23:00 - 00:00 1.00 DRILL N DPRB PROD1 1/3/2004 00:00 - 01 :00 1.00 CASE N DPRB PROD1 01 :00 - 02:30 1.50 CEMT P PROD1 02:30 - 04:00 1.50 CEMT P PROD1 04:00 - 04:30 0.50 CEMT P PROD1 04:30 - 09:00 4.50 CASE P PROD1 09:00 - 09:30 0.50 CASE P PROD1 09:30 - 10:30 1.00 CASE P PROD1 Page 6 of 7 12/20/2003 1/4/2004 Spud Date: 12/20/2003 End: 1/4/2004 Description of Operations --_.._....~.." -. -_.~..". . Printed: 1/5/2004 9:11 :29 AM - e BP EXPLORATION Operations Summary Report Legal Well Name: MPF-88 Common Well Name: MPF-88 Event Name: DRILL +COMPLETE Contractor Name: DOYON DRILLING INC. Rig Name: DOYON 14 Date From - To I I Code I NPT Hours Task ---..--.-. -....--.---- -_.~. .". --.-.. 1/3/2004 09:30 - 10:30 1.00 CASE P 10:30 - 14:30 4.00 CASE P 14:30 - 15:00 0.50 CASE P 15:00 - 16:00 1.00 CASE P 16:00 - 19:00 3.00 CASE P 19:00 - 19:30 0.50 CASE P 19:30 - 20:30 1.00 CASE P 20:30 - 00:00 3.50 CASE P 1/4/2004 00:00 - 03:00 3.00 CASE P 03:00 - 04:00 1.00 CASE P 04:00 - 04:30 0.50 CASE P 04:30 - 13:00 8.50 CASE P 13:00 - 13:30 0.50 CASE P 13:30 - 14:00 14:00 - 15:00 15:00 - 16:30 0.50 CASE P 1.00 BOPSUF P 1.50 WHSUR P 16:30 -17:00 17:00 - 18:30 1m 0.50 WHSUR P 1.50 CASE P 18:30 - 19:00 19:00 - 19:30 0.50 EVAL P 0.50 EVAL P 19:30 - 21 :00 1.50 EVAL P 21 :00 - 22:00 1.00 EVAL P 22:00 - 23:00 23:00 - 00:00 1.00 EVAL P 1.00 EVAL P Start: Rig Release: Rig Number: Phase PROD1 PROD1 PROD1 PROD1 PROD1 PROD1 PROD1 PROD1 PROD1 PROD1 PROD1 PROD1 PROD1 PROD1 PROD1 PROD1 PROD1 PROD1 PROD1 PROD1 PROD1 PROD1 PROD1 PROD1 Page 7 of 7 12/20/2003 1/4/2004 Spud Date: 12/20/2003 End: 1/4/2004 Description of Operations - _____~ .0.'-.-.._._.- ..--..-..-.-.-..-------.--- Change out 2 7/8" handling tools to 4" RIH to PBTD @ 12217' - Drill pipe measurement Circulate - GPM 385 - PP 3400 psi - RPM 100 - TQ 8K Test casing to 3500 psi for 30 mins - Record on chart Displace mud with seawater - RPM 100 - TQ 1 OK - GPM 400 - PP 3800 psi - Pump spacer and 2nd volume of seawater - Pump 2 drums of Inhibitor surface to surface Lay down 4" drill pipe to 11760' Cut drlg line - Service top drive Lay down 4" drill pipe to 6000' Con't laying down 4" drill pipe Change 4" handling tools to 2 7/8" tools - Lay down 2 7/8" drill pipe - Rig down 2 7/8" handling tools Pull wear ring - Rig up 4 1/2" casing tools to run completion string - PJSM Pick up tail pipe - Packer - make up - Run in hole with 280 joints 4.5" L-80 12.6# IBT-M tubing to 11740' Pick up landing joint / hanger - Make up and land tubing @ 11770' PU 160 - SO 100 - Block weight 50K - TWC installed in hanger - (Tubing hanger landing threads 41/2" TC-11) Lay down landing joint and clear floor Nipple down stack - Set back Nipple up Adapter flange - Tree - Test flange to 5000 psi for 10 mins - Test tree to 5000 psLfor 10 mins Pull TWC Rig up 1 st Energy Hot oil - Pump 77 bbls diesel down Annulus @ 2.6 bpm 1000 psi - Suck back 2 bbls - Freeze protected to 2200' U-Tube diesel from annulus to tubing Drop 1 7/8" steel ball on rollar stem - Test pump lines to 4200 psi Pressure up with Hot oil truck to 4000 psi - Set packer - Hold pressure for 30 mins - annulus valve open - recorded on chart - Bleed off pressure to 1000 psi on tubing - Test lines to 4700 psi - Pressure up annulus to 4500 psi - hold for 30 mins - recorded on chart - Bleed off pressure on annulus - Bleed off pressure on tubing Rig down 1 st Energy hot oil - Install BPV - (BPV profile CIW 4" Type "H") Suck out cellar - Pull 2nd valve off annulus valve - Install flange Secure tree - Release rig at 24:00 hrs 01/04/2004 Printed: 11512004 9:11:29AM e e Well: Field: API: Permit: MPF-88i Milne Point Unit / Kuparuk River Sands 50-029-23185-00-00 203-1 93 Accept: Spud: Release: Rig: 12/19/03 12/20/03 01/04/04 Doyon 14 POST-RIG WORK 01/07/04 PULL BPV, PULL BALL & ROD, PULL RHC-M 02110/04 PRESSURE TEST INJECTION LINE TO 3500PSI. 02115/04 PERFORATE INTERVAL FROM 12081'-12121' DEPTH REFERENCED TO SLB USIT LOG DATED 11-JAN-2004. TAG TD AT 12201'. PERFORATE WITH PJ 3406 HSD GUNS 6 SPF, 60 DEG RANDOM. API DATA IN 4-1/2" CASING: EHD= 0.45", PEN= 38.6". AFTER FIRST SHOT WHP DROPPED FROM 200 PSI TO 0 PSI. ,. 02116/04 PERFORATE INTERVAL FROM 12034'-12048' & 12056'-12075' (12081'-12121' SHOT DAY PRIOR)- DEPTH REFERENCED TO SLB USIT LOG DATED 11-JAN-2004. TAG TD AT 12201', PERFORATE WITH PJ 3406 HSD GUNS 6 SPF, 60 DEG RANDOM. API DATA IN 4-1/2" CASING: EHD= 0.45", PEN= 38.6". MEMORY PRESSURE TOOL RUN BELOW FIRST GUN RUN OF THE DAY INTERVAL: 12056'-12075'. WAITED THREE HOURS AFTER SHOT RECORDING PRESSURE STOP COUNT. ON SURFACE FIND SLlCKLlNE SHOCK ABSORBER PARTED AND MEMORY TOOL LEFT IN HOLE. 02123/04 PUMP 10 BBLS MEOH, 90 BBLS PRODUCED WATER, 25 BBLS MEOH TO WARM UP WELL BEFORE BRINGING ON WATER INJECTION. FINAL T/I/0=250/50/0. 02123/04 FISHED E-LlNE MEMORY TOOLS @ 12182'WLM. POOH W / TOOLS. RDMO 03/09/04 INITIAL 4 YEAR MITIA TO 2000 PSI PASSED. TEST WAS WITNESSED BY CHUCK SCHEVE OF THE AOGCC. Legal Name: MPF-88 Common Name: MPF-88 Test Date .--...... .!..... 12/26/2003 FIT 1/1/2004 FIT Test Type ! Test Depth (TMD) 7,890.0 (ft) 11,928.0 (ft) BP EXPLORATION Leak-Off Test Summary ....................-....--.---......-. Test Depth (rve) ....... .... .~..__._-- 4,586.0 (ft) 7,016.0 (ft) AMW 8.90 (ppg) 9.80 (ppg) 1----..··.···-···.-··.······.·····.·········.·······. ........-...... I Surface Pressure Leak Off Pressure (BHP) . -.----- -. ..... ."... .--.-- ..-...................- --.--.- 620 (psi) 2,740 (psi) 990 (psi) 4,562 (psi) Page 1 of 1 EMW 11.50 (ppg) 12.52 (ppg) Printed: 1/5/2004 9: 11 :20 AM . . &03-\93 14-Jan-04 AOGCC Howard Okland 333 W. 7th Ave. Suite 100 Anchorage, AK 99501 DEFINITIVE Re: Distribution of Survey Data for Well MPF-88 Dear: Dear Sir/Madam: Enclosed are two survey hard copies. Tie-on Survey: Window / Kickoff Survey: Projected Survey: 0.00' MD O'MD 12,310.00' MD (if Applicalble) Please call me at 563-3256 if you have any questions or concerns. Regards, William T. Allen Survey Manager attachments RECEIVED 1 6 2\)04 ,-. !~Ü~~~.a ŒI 8. Gas Cons. Commission Þm::horage ·~:~'D0' (~ Halliburton Sperry-Sun Milne Point Unit BPXA Milne Point MPF MPF-88 Job No. AKZZ0002816602, Surveyed: 1 January, 2004 Survey Report 12 January, 2004 Your Ref: API 500292381500 Surface Coordinates: 6035588.83 N, 541655.92 E (70030' 29.3375" N, 149039' 33.0308" W) Grid Coordinate System: NAD27 Alaska State Planes, Zone 4 Surface Coordinates relative to Project H Reference: 1035588.83 N, 41655.92 E (Grid) Surface Coordinates relative to Structure Reference: 5575.06 N, 9872.90 E (True) Kelly Bushing Elevation: 45.42ft above Mean Sea Level Kelly Bushing Elevation: 45.42ft above Project V Reference Kelly Bushing Elevation: 45.42ft above Structure Reference SpE!ï'......y-,sur, DRrL.LrNG. seRvrc:es A Halliburton Company DEFINITI E e e Survey Ref: svy1320 Halliburton Sperry-Sun Survey Report for Milne Point MPF - MPF-88 Your Ref: AP/500292381500 Job No. AKZZ0002816602, Surveyed: 1 January, 2004 BPXA Milne Point Unit Measured Sub-Sea Vertical Local Coordinates Global Coordinates Dogleg Vertical Depth Incl. Azim. Depth Depth Northings Eastings Northings Eastings Rate Section Comment (ft) (ft) (ft) (ft) (ft) (ft) (ft) (0/100ft) 0.00 0.000 0.000 -45.42 0.00 0.00 N 0.00 E 6035588.83 N 541655.92 E 0.00 Tolerable Gyro 84.00 0.250 79.000 38.58 84.00 0.03 N 0.18 E 6035588.87 N 541656.10 E 0.298 0.03 AK-6 BP JFR-AK 209.14 1 .450 353.670 163.71 209.13 1.66 N 0.27 E 6035590.49 N 541656.18 E 1.160 1.66 299.16 2.990 359.690 253.66 299.08 5.14 N 0.14 E 6035593.97 N 541656.03 E 1.728 5.14 389.11 4.650 342.280 343.41 388.83 10.96 N 0.99W 6035599.78 N 541654.87 E 2.231 10.96 e 479.35 6.870 331.090 433.19 478.61 19.17 N 4.71 W 6035607.97 N 541651.10 E 2.746 19.17 572.41 8.980 329.790 525.35 570.77 30.32 N 11.06 W 6035619.09 N 541644.69 E 2.275 30.32 663.00 11 .960 334.840 614.43 659.85 44.93 N 18.61 W 6035633.65 N 541637.06 E 3.439 44.93 758.16 17.110 341.800 706.52 751.94 67.17 N 27.18 W 6035655.85 N 541628.37 E 5.705 67.17 851.21 21.310 339.910 794.37 839.79 96.06 N 37.26 W 6035684.68 N 541618.12 E 4.562 96.06 941.30 21.410 338.940 878.27 923.69 126.78 N 48.80 W 6035715.34 N 541606.41 E 0.408 126.78 1033.97 23.570 336.580 963.89 1009.31 159.57 N 62.24 W 6035748.05 N 541592.79 E 2.526 159.57 1127.86 26.500 335.600 1048.95 1094.37 195.88 N 78.36 W 6035784.27 N 541576.46 E 3.152 195.88 1221.57 28.220 335.270 1132.17 1177.59 235.05 N 96.27 W 6035823.34 N 541558.34 E 1.843 235.05 1315.13 28.940 335.910 1214.33 1259.75 275.81 N 114.76 W 6035863.99 N 541539.62 E 0.836 275.81 1412.47 30.840 335.820 1298.72 1344.14 320m N 134.59 W 6035908.14 N 541519.53 E 1.952 320.07 1505.26 32.160 334.270 1377.84 1423.26 364.02 N 155.06 W 6035951.97 N 541498.82 E 1.669 364.02 1600.46 34.210 332.380 1457.51 1502.93 410.56 N 178.47 W 6035998.38 N 541475.15 E 2.412 410.56 1693.95 37.050 333.280 1533.49 1578.91 459.02 N 203.32 W 6036046.70 N 541450.03 E 3.089 459.02 1788.35 35.990 335.900 1609.36 1654.78 509.74 N 227.44 W 6036097.29 N 541425.63 E 1.997 509.74 1882.57 36.900 340.550 1685.16 1730.58 561.69 N 248.16 W 6036149.12 N 541404.61 E 3.086 561.69 1977.33 36.120 344.460 1761.34 1806.76 615.44 N 265.12 W 6036202.77 N 541387.35 E 2.589 615.44 e 2070.83 39.550 348.530 1835.18 1880.60 671.18 N 278.43 W 6036258.44 N 541373.73 E 4.536 671.18 2165.38 44.530 352.070 1905.39 1950.81 733.57 N 289.00 W 6036320.77 N 541362.81 E 5.832 733.57 2259.51 50.170 354.400 1969.14 2014.56 802.29 N 297.08 W 6036389.44 N 541354.34 E 6.261 802.29 2352.96 51.570 356.200 2028.12 2073.54 874.53 N 303.01 W 6036461.65 N 541348.01 E 2.116 874.53 2447.01 54.760 356.240 2084.50 2129.92 949.63 N 307.97 W 6036536.72 N 541342.63 E 3.392 949.63 2540.45 59.300 356.890 2135.33 2180.75 1027.86 N 312.66 W 6036614.93 N 541337.50 E 4.894 1027.86 2633.48 62.800 357.550 2180.36 2225.78 1109.16 N 316.60 W 6036696.20 N 541333.11 E 3.813 1109.16 2725.81 63.170 357.870 2222.30 2267.72 1191.35N 319.88 W 6036778.37 N 541329.36 E 0.506 1191.35 2823.23 63.190 358.060 2266.25 2311.67 1278.24 N 322.97 W 6036865.24 N 541325.79 E 0.175 1278.24 2914.98 62.740 358.210 2307.96 2353.38 1359.92 N 325.63 W 6036946.90 N 541322.67 E 0.512 1359.92 3009.26 63.710 357.450 2350.43 2395.85 1444.03 N 328.82 W 6037030.99 N 541319.01 E 1.256 1444.03 3102.34 64.270 357.880 2391.25 2436.67 1527.61 N 332.23 W 6037114.55 N 541315.13 E 0.731 1527.61 3197.26 64.420 357.770 2432.34 2477.76 1613.11 N 335.48 W 6037200.03 N 541311.40E 0.189 1613.11 12 January, 2004·15:12 Page 20f6 DrillQuest 3.03.05.005 Halliburton Sperry-Sun Survey Report for Mifne Point MPF . MPF·88 Your Ref: API 500292381500 Job No. AKZZ0002816602, Surveyed: 1 January, 2004 BPXA Mifne Point Unit Measured Sub-Sea Vertical Local Coordinates Global Coordinates Dogleg Vertical Depth Incl. Azim. Depth Depth Northings Eastings Northings Eastings Rate Section Comment (ft) (ft) (ft) (ft) (ft) (ft) (ft) (a/100ft) 3291.21 63.870 357.020 2473.31 2518.73 1697.57 N 339.32 W 6037284.47 N 541307.09 E 0.927 1697.57 3384.22 63.730 357.260 2514.38 2559.80 1780.92 N 343.48 W 6037367.79 N 541302.46 E 0.276 1780.92 3477.38 63.740 357.310 2555.60 2601.02 1864.37 N 347.44 W 6037451.22 N 541298.03 E 0.049 1864.37 3572.05 63.280 354.570 2597.84 2643.26 1948.87 N 353.43 W 6037535.69 N 541291.56 E 2.636 1948.87 3662.41 63.950 355.080 2637.99 2683.41 2029.49 N 360.73 W 6037616.26 N 541283.81 E 0.897 2029.49 e 3754.97 64.740 354.810 2678.07 2723.49 2112.60N 368.08 W 6037699.33 N 541275.99 E 0.893 2112.60 3848.39 63.030 353.810 2719.19 2764.61 2196.06 N 376.40 W 6037782.75 N 541267.22 E 2.067 2196.06 3942.40 62.880 353.360 2761.93 2807.35 2279.27 N 385.75 W 6037865.90 N 541257.39 E 0.455 2279.27 4035.56 63.030 353.690 2804.29 2849.71 2361.71 N 395.11 W 6037948.29 N 541247.58 E 0.354 2361.71 4129.43 62.410 355.490 2847.32 2892.74 2444.77 N 402.98 W 6038031.30 N 541239.24 E 1.828 2444.77 4224.66 62.960 355.220 2891.02 2936.44 2529.10 N 409.83 W 6038115.59 N 541231.92 E 0.630 2529.10 4318.13 63.320 354.800 2933.25 2978.67 2612.17 N 417.08 W 6038198.62 N 541224.20 E 0.556 2612.17 4413.38 62.900 356.580 2976.33 3021.75 2696.87 N 423.47 W 6038283.29 N 541217.34 E 1.724 2696.87 4504.34 63.110 356.880 3017.62 3063.04 2777.79 N 428.09 W 6038364.18 N 541212.26 E 0.374 2777.79 4599.65 62.390 357.030 3061.26 3106.68 2862.40 N 432.59 W 6038448.76 N 541207.28 E 0.768 2862.40 4692.42 61.620 357.250 3104.80 3150.22 2944.21 N 436.68 W 6038530.55 N 541202.74 E 0.856 2944.21 4787.42 61.910 357.200 3149.75 3195.17 3027.81 N 440.73 W 6038614.12 N 541198.22 E 0.309 3027.81 4880.74 62.350 357.510 3193.37 3238.79 3110.22N 444.54 W 6038696.51 N 541193.95E 0.555 3110.22 4974.61 62.600 357.560 3236.75 3282.17 3193.39 N 448.12 W 6038779.66 N 541189.90 E 0.270 3193.39 5066.78 62.810 357.430 3279.02 3324.44 3275.22 N 451.70 W 6038861.46 N 541185.86 E 0.260 3275.22 5160.94 63.030 357.660 3321.88 3367.30 3358.98 N 455.29 W 6038945.20 N 541181.80 E 0.319 3358.98 5257.20 62.950 358.050 3365.60 3411.02 3444.68 N 458.50 W 6039030.88 N 541178.11 E 0.370 3444.68 e 5352.02 63.450 356.120 3408.35 3453.77 3529.20 N 462.81 W 6039115.38 N 541173.33 E 1.892 3529.20 5444.99 63.310 356.170 3450.01 3495.43 3612.12N 468.40 W 6039198.27 N 541167.28 E 0.158 3612.12 5539.49 63.880 353.140 3492.04 3537.46 3696.38 N 476.28 W 6039282.48 N 541158.92E 2.934 3696.38 5634.71 64.220 351.950 3533.71 3579.13 3781.28 N 487.39 W 6039367.31 N 541147.33 E 1.179 3781.28 5730.00 64.830 351.450 3574.70 3620.12 3866.40 N 499.81 W 6039452.37 N 541134.43 E 0.796 3866.40 5822.71 65.430 351.120 3613.69 3659.11 3949.54 N 512.56 W 6039535.43 N 541121.22 E 0.723 3949.54 5917.53 64.140 351.440 3654.08 3699.50 4034.33 N 525.56 W 6039620.15 N 541107.74 E 1.394 4034.33 6010.97 63.250 351.990 3695.49 3740.91 4117.22 N 537.64 W 6039702.97 N 541095.20 E 1.089 4117.22 6105.96 62.740 350.890 3738.62 3784.04 4200.91 N 550.23 W 6039786.59 N 541082.14 E 1.163 4200.91 6199.80 63.590 350.510 3780.98 3826.40 4283.54 N 563.76 W 6039869.14 N 541068.14 E 0.975 4283.54 6292.28 63.580 349.920 3822.13 3867.55 4365.16 N 577.84 W 6039950.68 N 541053.61 E 0.571 4365.16 6386.77 63.860 350.680 3863.96 3909.38 4448.67 N 592.11 W 6040034.11 N 541038.87 E 0.780 4448.67 6481.37 63.170 351.540 3906.15 3951.57 4532.32 N 605.20 W 6040117.69 N 541025.31 E 1.093 4532.32 12 January, 2004 - 15:12 Page 3 of6 DrillQuest 3.03.05.005 ~~ Halliburton Sperry-Sun Survey Report for Milne Point MPF - MPF-88 Your Ref: AP/500292381500 Job No. AKZZ0002816602, Surveyed: 1 January, 2004 BPXA Milne Point Unit Measured Sub-Sea Vertical Local Coordinates Global Coordinates Dogleg Vertical Depth Incl. Azim. Depth Depth Northings Eastings Northings Eastings Rate Section Comment (ft) (ft) (ft) (ft) (ft) (ft) (ft) (0/100ft) 6575.33 62.140 352.080 3949.31 3994.73 4614.93 N 617.09 W 6040200.23 N 541012.96 E 1.209 4614.93 6670.28 61.000 352.350 3994.51 4039.93 4697.66 N 628.40 W 6040282.89 N 541001.18 E 1.226 4697.66 6762.15 62.010 353.560 4038.34 4083.76 4777.79 N 638.30 W 6040362.96 N 540990.84 E 1.596 4777.79 6856.15 61.630 353.310 4082.74 4128.16 4860.10 N 647.77 W 6040445.22 N 540980.90 E 0.467 4860.10 6951.69 60.920 353.680 4128.65 4174.07 4943.35 N 657.27 W 6040528.41 N 540970.94 E 0.817 4943.35 e 7046.48 61.290 352.940 4174.46 4219.88 5025.77 N 666.94 W 6040610.78 N 540960.81 E 0.787 5025.77 7140.86 62.490 352.180 4218.92 4264.34 5108.31 N 677.72 W 6040693.26 N 540949.57 E 1.456 5108.31 7235.23 64.560 352.020 4260.99 4306.41 5191.98N 689.33 W 6040776.86 N 540937.49 E 2.199 5191.98 7329.84 64.870 352.180 4301.40 4346.82 5276.71 N 701.09 W 6040861.53 N 540925.25 E 0.362 5276.71 7424.07 63.650 352.330 4342.33 4387.75 5360.82 N 712.53 W 6040945.57 N 540913.34 E 1.303 5360.82 7517.90 62.750 352.520 4384.63 4430.05 5443.84 N 723.57 W 6041028.52 N 540901.84 E 0.976 5443.84 7612.02 63.440 351.650 4427.22 4472.64 5526.97 N 735.13 W 6041111.59 N 540889.81 E 1.103 5526.97 7705.64 64.200 351.320 4468.53 4513.95 5610.06 N 747.57 W 6041194.61 N 540876.91 E 0.871 5610.06 7799.32 63.710 351.670 4509.66 4555.08 5693.30 N 760.02 W 6041277. 78 N 540863.99 E 0.622 5693.30 7903.51 62.890 350.940 4556.47 4601.89 5785.31 N 774.08 W 6041369.70 N 540849.41 E 1.006 5785.31 7998.14 62.040 350.660 4600.22 4645.64 5868.14 N 787.50 W 6041452.46 N 540835.53 E 0.936 5868.14 8091.96 62.110 351.810 4644.16 4689.58 5950.06 N 800.13 W 6041534.31 N 540822.44 E 1.086 5950.06 8186.22 63.370 351.700 4687.33 4732.75 6032.99 N 812.15 W 6041617.17 N 540809.96 E 1.341 6032.99 8280.90 63.360 351.630 4729.78 4775.20 6116.72N 824.42 W 6041700.84 N 540797.22 E 0.067 6116.72 8375.07 63.710 352.680 4771.74 4817.16 6200.24 N 835.92 W 6041784.28 N 540785.24 E 1.065 6200.24 8468.42 63.570 352.310 4813.19 4858.61 6283.16 N 846.85 W 6041867.15 N 540773.85 E 0.386 6283.16 8563.42 62.880 351.650 4855.99 4901.41 6367.15 N 858.68 W 6041951.06 N 540761.55 E 0.955 6367.15 e 8657.52 63.910 354.090 4898.13 4943.55 6450.62 N 869.11 W 6042034.48 N 540750.65 E 2.564 6450.62 8752.20 63.650 353.600 4939.97 4985.39 6535.07 N 878.22 W 6042118.87 N 540741.07 E 0.539 6535.07 8846.89 63.220 354.060 4982.31 5027.73 6619.27 N 887.32 W 6042203.02 N 540731.50 E 0.629 6619.27 8942.47 62.600 353.020 5025.84 5071.26 6703.83 N 896.89 W 6042287.52 N 540721.45 E 1.166 6703.83 9035.90 61.840 353.240 5069.39 5114.81 6785.89 N 906.78 W 6042369.53 N 540711.10E 0.840 6785.89 9129.96 61.140 352.040 5114.28 5159.70 6867.86 N 917.36 W 6042451.44 N 540700.06 E 1.346 6867.86 9225.52 59.650 353.900 5161.49 5206.91 6950.31 N 927.54 W 6042533.83 N 540689.42 E 2.301 6950.31 9320.60 58.940 354.130 5210.04 5255.46 7031.62 N 936.07 W 6042615.09 N 540680.44 E 0.775 7031.62 9415.50 58.700 354.470 5259.17 5304.59 7112.41N 944.13 W 6042695.83 N 540671.92 E 0.397 7112.41 9508.85 58.440 355.560 5307.85 5353.27 7191.76 N 951.05 W 6042775.14 N 540664.55 E 1.035 7191.76 9603.60 57.940 356.580 5357.80 5403.22 7272.09 N 956.57 W 6042855.44 N 540658.58 E 1.056 7272.09 9699.04 57.540 356.780 5408.74 5454.16 7352.66 N 961.25 W 6042935.98 N 540653.46 E 0.455 7352.66 9792.94 55.860 357.110 5460.29 5505.71 7431.02 N 965.43 W 6043014.32 N 540648.83 E 1.813 7431.02 12 January, 2004 - 15:12 Page 4 of6 DrillQuest 3.03.05.005 Halliburton Sperry-Sun Survey Report for Milne Point MPF - MPF-88 Your Ref: API 500292381500 Job No. AKZZ0002816602, Surveyed: 1 January, 2004 BPXA Milne Point Unit Measured Sub-Sea Vertical Local Coordinates Global Coordinates Dogleg Vertical Depth Incl. Azim. Depth Depth Northings Eastings Northings Eastings Rate Section Comment (ft) (ft) (ft) (ft) (ft) (ft) (ft) (o/100ft) 9884.73 54.440 358.480 5512.74 5558.16 7506.29 N 968.34 W 6043089.57 N 540645.50 E 1.973 7506.29 9978.85 52.510 358.490 5568.76 5614.18 7581.90 N 970.34 W 6043165.17 N 540643.08 E 2.051 7581.90 10072.94 51.190 0.160 5626.88 5672.30 7655.88 N 971.22 W 6043239.14 N 540641.78 E 1.979 7655.88 10166.93 50.480 0.810 5686.24 5731.66 7728.75 N 970.61 W 6043312.01 N 540641.99 E 0.926 7728.75 10261.26 49.880 359.740 5746.65 5792.07 7801.19 N 970.25 W 6043384.46 N 540641.94 E 1.079 7801.19 e 10354.60 48.180 1.660 5807.85 5853.27 7871.66 N 969.41 W 6043454.93 N 540642.39 E 2.393 7871.66 10448.84 47.590 1.610 5871.05 5916.47 7941.54 N 967.41 W 6043524.82 N 540643.99 E 0.627 7941.54 10544.89 46.910 0.710 5936.25 5981.67 8012.05 N 965.98 W 6043595.34 N 540645.02 E 0.987 8012.05 10641.23 46.130 2.390 6002.54 6047.96 8081.93 N 964.10 W 6043665.22 N 540646.52 E 1.502 8081.93 10732.19 45.730 2.980 6065.81 6111.23 8147.21 N 961.04 W 6043730.52 N 540649.21 E 0.641 8147.21 10829.52 45.400 3.620 6133.95 6179.37 8216.59 N 957.04 W 6043799.92 N 540652.82 E 0.579 8216.59 10924.05 44.050 6.190 6201.11 6246.53 8282.86 N 951.37 W 6043866.22 N 540658.12 E 2.387 8282.86 11018.63 43.380 6.350 6269.48 6314.90 8347.83 N 944.23 W 6043931.23 N 540664.89 E 0.718 8347.83 11112.16 42.460 6.020 6337.97 6383.39 8411.15 N 937.37 W 6043994.59 N 540671.40 E 1.013 8411.15 11207.37 42.160 8.730 6408.38 6453.80 8474.69 N 929.15 W 6044058.18 N 540679.26 E 1.942 8474.69 11296.93 40.800 8.960 6475.48 6520.90 8533.31 N 920.03 W 6044116.84 N 540688.05 E 1.528 8533.31 11390.64 39.070 8.080 6547.33 6592.75 8592.79 N 911.11 W 6044176.38 N 540696.64 E 1.942 8592.79 11482.59 38.810 10.970 6618.86 6664.28 8649.77 N 901.55 W 6044233.41 N 540705.88 E 1.995 8649.77 11579.51 37.840 9.990 6694.89 6740.31 8708.87 N 890.61 W 6044292.57 N 540716.48 E 1.181 8708.87 11673.92 37.740 10.630 6769.50 6814.92 8765.79 N 880.26 W 6044349.54 N 540726.52 E 0.429 8765.79 11767.51 36.850 10.330 6843.95 6889.37 8821.55 N 869.95 W 6044405.36 N 540736.52 E 0.971 8821.55 11859.65 36.970 12.900 6917.63 6963.05 8875.74 N 858.80 W 6044459.62 N 540747.36 E 1.680 8875.74 e 11980.02 36.370 15.710 7014.18 7059.60 8945.38 N 841.06 W 6044529.36 N 540764.71 E 1 .480 8945.38 12075.33 35.020 18.750 7091.59 7137.01 8998.49 N 824.61 W 6044582.55 N 540780.86 E 2.338 8998.49 12172.88 33.800 23.580 7172.09 7217.51 9049.87 N 804.76 W 6044634.05 N 540800.43 E 3.064 9049.87 12246.39 33.530 31.300 7233.30 7278.72 9085.98 N 786.02 W 6044670.26 N 540818.96 E 5.830 9085.98 ~1231 0.00 33.530 31.300 7286.32 7331.74 . 9116.00 N 767.77 W 6044700.38 N 540837.04 E 0.000 9116.00 Projected Survey All data is in Feet (US Survey) unless otherwise stated. Directions and coordinates are relative to True North. Vertical depths are relative to MPF-88. Northings and Eastings are relative to MPF-88. Global Northings and Eastings are relative to NAD27 Alaska State Planes, Zone 4. The Dogleg Severity is in Degrees per 100 feet (US Survey). Vertical Section is from MPF-88 and calculated along an Azimuth of 0.000° (True). Magnetic Declination at Surface is 25.045° (10-Dec-03) 12 January, 2004 - 15:12 Page 50f6 DrillQuest 3.03.05.005 · Halliburton Sperry-Sun Survey Report for Milne Point MPF - MPF-88 Your Ref: API 500292381500 Job No. AKZZ0002816602, Surveyed: 1 January, 2004 BPXA Milne Point Unit Based upon Minimum Curvature type calculations, at a Measured Depth of 12310.00ft., The Bottom Hole Displacement is 9148.28ft., in the Direction of 355.186° (True). Comments Measured Depth (ft) Station Coordinates TVD Northin9s Eastings (ft) (ft) (ft) Comment e 12310.00 7331.74 9116.00 N 767.77 W Projected Survey Survey tool prOf/ram for MPF-88 From Measured Vertical Depth Depth (ft) (ft) To Measured Vertical Depth Depth Survey Tool Description (ft) (ft) 0.00 84.00 0.00 84.00 84.00 12310.00 84.00 Tolerable Gyro 7331.74 AK-6 BP _IFR-AK e 12 January, 2004 - 15:12 Page 60f6 DrillQuest 3.03.05.005 . . ¿¡03-\C(3 14-Jan-04 AOGCC Howard Okland 333 W. 7th Ave. Suite 100 Anchorage, AK 99501 Re: Distribution of Survey Data for Well MPF-88 MWD Dear: Dear Sir/Madam: Enclosed are two survey hard copies. Tie-on Survey: Window / Kickoff Survey: Projected Survey: 0.00' MD O'MD 12,310.00' MD (if Applicalble) Please call me at 563-3256 if you have any questions or concerns. Regards, William T. Allen Survey Manager attachments RECEIVED ".' 1 1 6 2QG4 \..~. '. . ,l\I1J\5ka on 8. Gas Cons. Commission :'-mtorage =-~1s~ \\ \b Halliburton Sperry-Sun Milne Point Unit BPXA Milne Point MPF MPF-88 MWD e Job No. AKMW0002816602, Surveyed: 1 January, 2004 Survey Report 12 January, 2004 Your Ref: API 500292381500 Surface Coordinates: 6035588.83 N, 541655.92 E (70030' 29.3375Ø N, 149039' 33.0308" W) Grid Coordinate System: NAD27 Alaska State Planes, Zone 4 e Surface Coordinates relative to Project H Reference: 1035588.83 N, 41655.92 E (Grid) Surface Coordinates relative to Structure Reference: 5575.06 N, 9872.90 E (True) Kelly Bushing Elevation: 45.42ft above Mean Sea Level Kelly Bushing Elevation: 45.42ft above Project V Reference Kelly Bushing Elevation: 45.42ft above Structure Reference SpE!I"""'I"""'V-SU1'1 C AILL-IN c::r .. SSA vn::::ss A Halliburton Company Survey Ref: svy1326 Halliburton Sperry-Sun Survey Report for Milne Point MPF - MPF-88 MWD Your Ref: API 500292381500 Job No. AKMW0002816602, Surveyed: 1 January, 2004 BPXA Milne Point Unit Measured Sub-Sea Vertical Local Coordinates Global Coordinates Dogleg Vertical Depth Incl. Azim. Depth Depth Northings Eastings Northings Eastings Rate Section Comment (ft) (ft) (ft) (ft) (ft) (ft) (ft) (0/100ft) 0.00 0.000 0.000 -45.42 0.00 0.00 N 0.00 E 6035588.83 N 541655.92 E 0.00 Tolerable Gyro 84.00 0.250 79.000 38.58 84.00 0.03 N 0.18 E 6035588.87 N 541656.10 E 0.298 0.03 MWD Magnetic 209.14 1 .450 353.940 163.71 209.13 1.66 N 0.28 E 6035590.49 N 541656.19 E 1.159 1.66 299.16 2.990 0.030 253.66 299.08 5.14 N 0.16 E 6035593.97 N 541656.05 E 1.728 5.14 389.11 4.650 342.960 343.41 388.83 10.97 N 0.91 W 6035599.80 N 541654.95 E 2.218 10.97 e 479.35 6.870 331.560 433.19 478.61 19.22 N 4.55W 6035608.02 N 541651.26 E 2.756 19.22 572.41 8.980 330.180 525.35 570.77 30.42 N 10.81 W 6035619.18 N 541644.94 E 2.276 30.42 663.00 11.960 336.050 614.43 659.85 45.13 N 18.14 W 6035633.86 N 541637.53 E 3.490 45.13 758.16 17.110 342.260 706.52 751.94 67.49 N 26.41 W 6035656.17 N 541629.13 E 5.647 67.49 851.21 21.310 340.240 794.37 839.79 96.45 N 36.30 W 6035685.08 N 541619.08 E 4.569 96.45 941.30 21.410 339.250 878.27 923.69 127.24 N 47.66 W 6035715.80 N 541607.54 E 0.415 127.24 1033.97 23.570 336.800 963.89 1009.31 160.09 N 60.96 W 6035748.57 N 541594.07 E 2.540 160.09 1127.86 26.500 335.750 1048.95 1094.37 196.45 N 76.96 W 6035784.84 N 541577.86 E 3.156 196.45 1221.57 28.220 335.190 1132.17 1177.59 235.62 N 94.84 W 6035823.92 N 541559.76 E 1.856 235.62 1315.13 28.940 335.930 1214.33 1259.75 276.37 N 113.36 W 6035864.56 N 541541.01 E 0.858 276.37 1412.47 30.840 335.610 1298.72 1344.14 320.60 N 133.27 W 6035908.68 N 541520.85 E 1.959 320.60 1505.26 32.160 333.250 1377.84 1423.26 364.32 N 154.21 W 6035952.28 N 541499.67 E 1.946 364.32 1600.46 34.210 331.580 1457.51 1502.93 410.49 N 178.35 W 6035998.31 N 541475.27 E 2.358 410.49 1693.95 37.050 333.210 1533.49 1578.91 458.75 N 203.56 W 6036046.44 N 541449.79 E 3.203 458.75 1788.35 35.990 334.930 1609.36 1654.78 509.27 N 228.13 W 6036096.81 N 541424.94 E 1.561 509.27 1882.57 36.900 340.380 1685.17 1730.59 561.00 N 249.37 W 6036148.42 N 541403.41 E 3.568 561.00 1977.33 36.120 344.710 1761.34 1806.76 614.75 N 266.29 W 6036202.08 N 541386.19 E 2.840 614.75 e 2070.83 39.550 348.620 1835.19 1880.61 670.54 N 279.43 W 6036257.79 N 541372.73 E 4.475 670.54 2165.38 44.530 352.550 1905.40 1950.82 732.97 N 289.68 W 6036320.17 N 541362.13 E 5.955 732.97 2259.51 50.170 355.440 1969.16 2014.58 801.79 N 296.84 W 6036388.95 N 541354.59 E 6.402 801.79 2352.96 51.570 356.620 2028.13 2073.55 874.11 N 301.85 W 6036461.23 N 541349.17 E 1.790 874.11 2447.01 54.760 356.770 2084.51 2129.93 949.25 N 306.19 W 6036536.34 N 541344.41 E 3.394 949.25 2540.45 59.300 357.250 2135.34 2180.76 1027.51 N 310.27 W 6036614.58 N 541339.90 E 4.878 1027.51 2633.48 62.800 358.350 2180.37 2225.79 1108.84 N 313.38 W 6036695.90 N 541336.33 E 3.902 1108.84 2725.81 63.170 358.420 2222.31 2267.73 1191.06N 315.70 W 6036778.11 N 541333.55 E 0.406 1191.06 2823.23 63.190 358.600 2266.26 2311.68 1277.98 N 317.96 W 6036865.00 N 541330.80 E 0.166 1277.98 2914.98 62.740 358.440 2307.97 2353.39 1359.67 N 320.07 W 6036946.69 N 541328.23 E 0.514 1359.67 3009.26 63.710 358.010 2350.44 2395.86 1443.80 N 322.68 W 6037030.80 N 541325.15 E 1.106 1443.80 3102.34 64.270 358.450 2391.26 2436.68 1527.41 N 325.26 W 6037114.40 N 541322.10 E 0.737 1527.41 3197.26 64.420 358.010 2432.35 2477.77 1612.94N 327.90 W 6037199.90 N 541318.98 E 0.447 1612.94 12 January, 2004 - 15:13 Page 20f6 DrillQuest 3.03.05.005 Halliburton Sperry-Sun Survey Report for Milne Point MPF - MPF-88 MWD Your Ref: AP/500292381500 Job No. AKMW0002816602, Surveyed: 1 January, 2004 BPXA Milne Point Unit Measured Sub-Sea Vertical Local Coordinates Global Coordinates Dogleg Vertical Depth Incl. Azim. Depth Depth Northings Eastings Northings Eastings Rate Section Comment (ft) (ft) (ft) (ft) (ft) (ft) (ft) (0/100ft) 3291.21 63.870 358.320 2473.32 2518.74 1697.44 N 330.61 W 6037284.39 N 541315.80 E 0.656 1697.44 3384.22 63.730 357.590 2514.39 2559.81 1780.84 N 333.59 W 6037367.77 N 541312.35 E 0.720 1780.84 3477.38 63.740 357.850 2555.61 2601.03 1864.31 N 336.91 W 6037451.22 N 541308.56 E 0.251 1864.31 3572.05 63.280 354.880 2597.85 2643.27 1948.86 N 342.28 W 6037535.74 N 541302.72 E 2.850 1948.86 3662.41 63.950 355.700 2638.00 2683.42 2029.53 N 348.92 W 6037616.37 N 541295.62 E 1.100 2029.53 e 3754.97 64.740 354.980 2678.08 2723.50 2112.69 N 355.70 W 6037699.49 N 541288.37 E 1.105 2112.69 3848.39 63.030 355.100 2719.20 2764.62 2196.26 N 362.96 W 6037783.02 N 541280.65 E 1.834 2196.26 3942.40 62.880 354.050 2761.94 2807.36 2279.61 N 370.87 W 6037866.32 N 541272.27 E 1.007 2279.61 4035.56 63.030 354.410 2804.30 2849.72 2362.16 N 379.21 W 6037948.83 N 541263.47 E 0.380 2362.16 4129.43 62.410 356.410 2847.33 2892.75 2445.32 N 385.89 W 6038031.94 N 541256.32 E 2.005 2445.32 4224.66 62.960 357.930 2891.03 2936.45 2529.82 N 390.07 W 6038116.42 N 541251.67 E 1.531 2529.82 4318.13 63.320 355.980 2933.26 2978.68 2613.08 N 394.50 W 6038199.66 N 541246.77 E 1.901 2613.08 4413.38 62.900 357.380 2976.35 3021.77 2697.89 N 399.42 W 6038284.44 N 541241.38 E 1.383 2697.89 4504.34 63.110 357.030 3017.63 3063.05 2778.84 N 403.37 W 6038365.37 N 541236.97 E 0.413 2778.84 4599.65 62.390 357.420 3061.27 3106.69 2863.47 N 407.48 W 6038449.97 N 541232.39 E 0.838 2863.47 4692.42 61.620 357.640 3104.82 3150.24 2945.31 N 411.01 W 6038531.79 N 541228.40 E 0.856 2945.31 4787.42 61.910 357.610 3149.76 3195.18 3028.94 N 414.48 W 6038615.39 N 541224.47 E 0.307 3028.94 4880.74 62.350 357.920 3193.39 3238.81 3111.37 N 417.69 W 6038697.81 N 541220.79 E 0.555 3111.37 4974.61 62.600 357.710 3236.77 3282.19 3194.55 N 420.87 W 6038780.97 N 541217.15 E 0.332 3194.55 5066.78 62.810 357.700 3279.03 3324.45 3276.40 N 424.15 W 6038862.80 N 541213.41 E 0.228 3276.40 5160.94 63.030 357.640 3321.90 3367.32 3360.16 N 427.55 W 6038946.54 N 541209.53 E 0.240 3360.16 5257.20 62.950 358.290 3365.62 3411.04 3445.87 N 430.60 W 6039032.23 N 541206.00 E 0.607 3445.87 e 5352.02 63.450 356.260 3408.37 3453.79 3530.40 N 434.63 W 6039116.74N 541201.50 E 1.982 3530.40 5444.99 63.310 356.580 3450.03 3495.45 3613.35 N 439.82 W 6039199.66 N 541195.85 E 0.343 3613.35 5539.49 63.880 353.420 3492.06 3537.48 3697.66 N 447.20 W 6039283.92 N 541187.99 E 3.055 3697.66 5634.71 64.220 352.230 3533.73 3579.15 3782.60 N 457.89 W 6039368.81 N 541176.82 E 1.179 3782.60 5730.00 64.830 351.690 3574.72 3620.14 3867.78 N 469.93 W 6039453.92 N 541164.31 E 0.819 3867.78 5822.71 65.430 351.430 3613.71 3659.13 3950.98 N 482.27 W 6039537.05 N 541151.50 E 0.695 3950.98 5917.53 64.140 351.740 3654.10 3699.52 4035.84 N 494.83 W 6039621.84 N 541138.47E 1.392 4035.84 6010.97 63.250 351.980 3695.51 3740.93 4118.76 N 506.69 W 6039704.69 N 541126.14 E 0.980 4118.76 6105.96 62.740 351.520 3738.64 3784.06 4202.52 N 518.83 W 6039788.37 N 541113.53 E 0.689 4202.52 6199.80 63.590 350.650 3781.00 3826.42 4285.24 N 531.81 W 6039871.02 N 541100.09 E 1.227 4285.24 6292.28 63.580 353.090 3822.15 3867.57 4367.22 N 543.52 W 6039952.94 N 541087.92 E 2.363 4367.22 6386.77 63.860 353.260 3863.98 3909.40 4451.35 N 553.59 W 6040037.00 N 541077.38 E 0.337 4451.35 6481.37 63.170 353.040 3906.17 3951.59 4535.41 N 563.69 W 6040121.01 N 541066.81 E 0.759 4535.41 12 January, 2004 - 15:13 Page 3 of 6 DrillQuest 3.03.05.005 Halliburton Sperry-Sun Survey Report for Milne Point MPF - MPF-88 MWD Your Ref: API 500292381500 Job No. AKMW0002816602, Surveyed: 1 January, 2004 BPXA Milne Point Unit Measured Sub-Sea Vertical Local Coordinates Global Coordinates Dogleg Vertical Depth Incl. Azim. Depth Depth Northings Eastings Northings Eastings Rate Section Comment (ft) (ft) (ft) (ft) (ft) (ft) (ft) (a/100ft) 6575.33 62.140 352.840 3949.33 3994.75 4618.24 N 573.95 W 6040203.78 N 541056.09 E 1.112 4618.24 6670.28 61.000 352.490 3994.54 4039.96 4701.05 N 584.60 W 6040286.53 N 541044.96 E 1 .244 4701.05 6762.15 62.010 353.860 4038.37 4083.79 4781.22 N 594.19 W 6040366.64 N 541034.92 E 1.711 4781.22 6856.15 61.630 353.730 4082.76 4128.18 4863.59 N 603.15 W 6040448.96 N 541025.51 E 0.422 4863.59 6951.69 60.920 353.690 4128.67 4174.09 4946.87 N 612.33 W 6040532.19 N 541015.86 E 0.744 4946.87 e 7046.48 61.290 353.090 4174.48 4219.90 5029.31 N 621.88 W 6040614.57 N 541005.85 E 0.678 5029.31 7140.86 62.490 352.620 4218.94 4264.36 5111.91 N 632.24 W 6040697.11 N 540995.03 E 1.345 5111.91 7235.23 64.560 352.470 4261.01 4306.43 5195.66 N 643.20 W 6040780.80 N 540983.60 E 2.198 5195.66 7329.84 64.870 353.080 4301.42 4346.84 5280.53 N 653.96 W 6040865.61 N 540972.36 E 0.669 5280.53 7424.07 63.650 353.050 4342.35 4387.77 5364.78 N 664.21 W 6040949.80 N 540961.64 E 1.295 5364.78 7517.90 62.750 352.940 4384.65 4430.07 5447.91 N 674.42 W 6041032.87 N 540950.96 E 0.965 5447.91 7612.02 63.440 352.210 4427.24 4472.66 5531.14 N 685.27 W 6041116.04 N 540939.65 E 1.008 5531.14 7705.64 64.200 351.750 4468.55 4513.97 5614.33 N 696.99 W 6041199.16 N 540927.46 E 0.924 5614.33 7799.32 63.710 352.010 4509.68 4555.10 5697.65 N 708.88 W 6041282.42 N 540915.10 E 0.579 5697.65 7903.51 62.890 351.410 4556.49 4601.91 5789.76 N 722.30 W 6041374.45 N 540901.17 E 0.940 5789.76 7998.14 62.040 351.390 4600.24 4645.66 5872.73 N 734.84 W 6041457.34 N 540888.16 E 0.898 5872.73 8091.96 62.11 0 352.270 4644.18 4689.60 5954.78 N 746.62 W 6041539.33 N 540875.92 E 0.832 5954.78 8186.22 63.370 352.160 4687.35 4732.77 6037.80 N 757.97 W 6041622.28 N 540864.10 E 1.341 6037.80 8280.90 63.360 352.130 4729.80 4775.22 6121.63N 769.54 W 6041706.05 N 540852.06 E 0.030 6121.63 8375.07 63.710 352.990 4771.76 4817.18 6205.22 N 780.46 W 6041789.58 N 540840.68 E 0.898 6205.22 8468.42 63.570 352.640 4813.21 4858.63 6288.21 N 790.92 W 6041872.51 N 540829.75 E 0.368 6288.21 8563.42 62.880 352.040 4856.01 4901.43 6372.27 N 802.22 W 6041956.50 N 540817.98 E 0.919 6372.27 e 8657.52 63.910 354.230 4898.15 4943.57 6455.79 N 812.27 W 6042039.97 N 540807.46 E 2.351 6455.79 8752.20 63.650 353.780 4939.99 4985.41 6540.27 N 821.14 W 6042124.39 N 540798.12 E 0.507 6540.27 8846.89 63.220 354.410 4982.33 5027.75 6624.51 N 829.85 W 6042208.58 N 540788.93 E 0.749 6624.51 8942.47 62.600 353.440 5025.86 5071.28 6709.12 N 838.86 W 6042293.15 N 540779.45 E 1.112 6709.12 9035.90 61.840 353.500 5069.40 5114.82 6791.25 N 848.26 W 6042375.22 N 540769.59 E 0.815 6791.25 9129.96 61.140 352.460 5114.30 5159.72 6873.28 N 858.36 W 6042457.19 N 540759.03 E 1.224 6873.28 9225.52 59.650 354.230 5161.51 5206.93 6955.80 N 867.99 W 6042539.65 N 540748.93 E 2.242 6955.80 9320.60 58.940 354.650 5210.06 5255.48 7037.16 N 875.92 W 6042620.97 N 540740.56 E 0.838 7037.16 9415.50 58.700 354.640 5259.19 5304.61 7118,00 N 883.49 W 6042701.76 N 540732.53 E 0.253 7118.00 9508.85 58.440 356.060 5307.87 5353.29 7197.39 N 889.95 W 6042781.11 N 540725.62 E 1.328 7197.39 9603.60 57.940 356.970 5357.82 5403.24 7277.76 N 894.85 W 6042861.45 N 540720.28 E 0.972 7277.76 9699.04 57.540 357.110 5408.76 5454.18 7358.36 N 899.02 W 6042942.03 N 540715.66 E 0.437 7358.36 9792.94 55.860 357.190 5460.31 5505.73 7436.74 N 902.92 W 6043020.39 N 540711.31 E 1.791 7436.74 12 January, 2004 - 15:13 Page 4 of6 DrillQuest 3.03.05.005 - Halliburton Sperry-Sun Survey Report for Milne Point MPF - MPF-88 MWD Your Ref: AP/500292381500 Job No. AKMW0002816602, Surveyed: 1 January, 2004 BPXA Milne Point Unit Measured Sub-Sea Vertical Local Coordinates Global Coordinates Dogleg Vertical Depth Incl. Azim. Depth Depth Northings Eastings Northings Eastings Rate Section Comment (ft) (ft) (ft) (ft) (ft) (ft) (ft) (0/100ft) 9884.73 54.440 358.520 5512.76 5558.18 7512.01 N 905.75 W 6043095.64 N 540708.06 E 1.951 7512.01 9978.85 52.510 358.790 5568.78 5614.20 7587.62 N 907.52 W 6043171.24 N 540705.86 E 2.063 7587.62 10072.94 51.190 0.150 5626.90 5672.32 7661.60 N 908.22 W 6043245.22 N 540704.76 E 1.806 7661.60 10166.93 50.480 0.940 5686.26 5731.68 7734.47 N 907.52 W 6043318.09 N 540705.04 E 0.998 7734.47 10261.26 49.880 0.040 5746.67 5792.09 7806.92 N 906.90 W 6043390.54 N 540705.25 E 0.970 7806.92 e 10354.60 48.180 2.050 5807.87 5853.29 7877.37 N 905.63 W 6043461.00 N 540706.13 E 2.441 7877.37 10448.84 47.590 1.880 5871.07 5916.49 7947.24 N 903.24 W 6043530.88 N 540708.13 E 0.640 7947.24 10544.89 46.910 1.250 5936.26 5981.68 8017.74N 901.31 W 6043601.39 N 540709.67 E 0.856 8017.74 1 0641 .23 46.130 2.750 6002.56 6047.98 8087.60 N 898.87 W 6043671.26 N 540711.71 E 1.390 8087.60 1 0732. 19 45.730 2.980 6065.82 6111.24 8152.87 N 895.61 W 6043736.55 N 540714.61 E 0.476 8152.87 10829.52 45.400 3.930 6133.96 6179.38 8222.24 N 891.42 W 6043805.95 N 540718.41 E 0.775 8222.24 10924.05 44.050 6.320 6201.13 6246.55 8288.49 N 885.50 W 6043872.22 N 540723.96 E 2.281 8288.49 11018.63 43.380 6.780 6269.49 6314.91 8353.42 N 878.04 W 6043937.20 N 540731.05 E 0.784 8353.42 11112.16 42.460 6.020 6337.98 6383.40 8416.72 N 870.94 W 6044000.53 N 540737.80 E 1.129 8416.72 11207.37 42.160 8.980 6408.40 6453.82 8480.24 N 862.58 W 6044064.10 N 540745.80 E 2.116 8480.24 11296.93 40.800 9.250 6475.50 6520.92 8538.81 N 853.18 W 6044122.73 N 540754.87 E 1.532 8538.81 11390.64 39.070 8.350 6547.35 6592.77 8598.26 N 843.97 W 6044182.22 N 540763.74 E 1.946 8598.26 11482.59 38.810 11 .260 6618.87 6664.29 8655.19 N 834.14 W 6044239.21 N 540773.26 E 2.009 8655.19 11579.51 37.840 10.270 6694.91 6740.33 8714.23 N 822.91 W 6044298.31 N 540784.16 E 1.184 8714.23 11673.92 37.740 10.950 6769.52 6814.94 8771.09 N 812.26 W 6044355.23 N 540794.49 E 0.454 8771.09 11767.51 36.850 10.460 6843.97 6889.39 8826.81 N 801.72 W 6044411.01 N 540804.71 E 1.002 8826.81 11859.65 36.970 13.250 6917.65 6963.07 8880.95 N 790.35 W 6044465.21 N 540815.78 E 1.823 8880.95 e 11980.02 36.370 15.320 7014.20 7059.62 8950.61 N 772.63 W 6044534.97 N 540833.11 E 1.142 8950.61 12075.33 35.020 19.350 7091.61 7137.03 9003.68 N 756.10 W 6044588.13 N 540849.35 E 2.844 9003.68 12172.88 33.800 24.530 7172.11 7217.53 9054.79 N 735.55 W 6044639.35 N 540869.60 E 3.250 9054.79 12246.39 33.530 32.600 7233.32 7278.74 9090.51 N 716.12 W 6044675.18 N 540888.84 E 6.093 9090.51 12310.00 33.530 32.600 7286.35 7331.77 9120.11 N 697.18 W 6044704.89 N 540907.60 E 0.000 9120.11 Projected Survey All data is in Feet (US Survey) unless otherwise stated. Directions and coordinates are relative to True North. Vertical depths are relative to MPF-88. Northings and Eastings are relative to MPF-88. Global Northings and Eastings are relative to NAD27 Alaska State Planes, Zone 4. The Dogleg Severity is in Degrees per 100 feet (US Survey). Vertical Section is from MPF-88 and calculated along an Azimuth of 0.000° (True). Magnetic Declination at Surface is 25.044° (10-Dec-03) 12 January, 2004 - 15:13 Page 50f6 DrillQuest 3.03.05.005 ~ - Halliburton Sperry-Sun Survey Report for Milne Point MPF - MPF-88 MWD Your Ref: AP/500292381500 Job No. AKMW0002816602, Surveyed: 1 January, 2004 BPXA Milne Point Unit Based upon Minimum Curvature type calculations, at a Measured Depth of 1231 O.OOf1., The Bottom Hole Displacement is 9146.72f1., in the Direction of 355.629° (True). Comments Measured Depth (ft) Station Coordinates TVD Northings Eastings (ft) (ft) (ft) Comment - 12310.00 7331.77 9120.11 N 697.18 W Projected Survey Survey too/prOf/ram for MPF-88 MWD From Measured Vertical Depth Depth (ft) (ft) To Measured Vertical Depth Depth Survey Tool Description (ft) (ft) 0.00 84.00 0.00 84.00 84.00 12310.00 84.00 Tolerable Gyro 7331.77 MWD Magnetic e 12 January, 2004 - 15:13 Page 60f6 Dri/lQuest 3.03.05.005 MEMORANDUM . . State of Alaska Alaska Oil and Gas Conservation Commission TO: THRU: Jim Regg P.I. Supervisor Kt'fl3/IsJCif DATE: Wednesday, March 10,2004 SUBJECT: Mechanical Integrity Tests BP EXPLORATION (ALASKA) INC F·88 MILNE PT UNIT KR F·88 FROM: Chuck Scheve Petroleum Inspector Src: Inspector NON-CONFIDENTIAL API Well Numbe 50-029-23185-00-00 InspN mitCS040309205737 Inspection Date: 3/9/2004 Packer Depth Pretest Initial 15 Min. 30 Min. 45 Min. 60 Min. Well: F-88 Type Inj. F TVD 6860 IA 0 2000 2000 2000 P.T. 2031930 TypeTest SPT Test psi 1715 OA 150 360 360 360 Interval Initial Test PIF Pass Tubing 850 850 850 850 Notes: Pretest pressure were observed and found stable. Type INJ. Fluid Codes F =FRESH WATER INJ. G=GAS INJ. S=SALT WATER INJ. N=NOT INJECTING Type Test M=Annulus Monitoring P=Standard Pressure Test R=Intemal Radioactive Tracer Survey A=Temprature Anomaly Surve D=Differential Temprature Test Inten-al 1=lnitial Test 4=Four Year Cycle. V=Required by Variance W=Test during Workover O=Other (describe in notes) Wednesday, March 10, 2004 Page I of 1 . . STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMMISSION Mechanical Integrity Test Email to:Winton_Aubert@admin.state.ak.us;Bob_Fleckenstein@admin.state.ak.us;Jim_Regg@admin.state.ak.us OPERATOR: FIELD I UNIT I PAD: DATE: OPERATOR REP: AOGCC REP: BP Exploration - Alaska Milne Point Unit IF-pad 02/24/04 Lee Hulme I P Well P.T.D. Notes: Well P.T.D. Notes: Well P.T.D. Notes: Well P.T.D. Notes: Test Details: TYPE INJ Codes F = Fresh Water Inj G = Gas Inj S = Salt Water Inj N = Not Injecting TYPE TEST Codes M = Annulus Monitoring P = Standard Pressure Test R = Internal Radioactive Tracer Survey A = Temperature Anomaly Survey D = Differential Temperature Test INTERVAL Codes I = Initial Test 4 = Four Year Cycle V = Required by Variance T = Test during Workover 0= Other (describe in notes) MIT Report Form Revised: 06/19/02 MIT MPU F 3-9-04.xls . ¿)03-· cf3 . WELL LOG TRANSMIITAL To: State of Alaska Alaska Oil and Gas Conservation Comm. Attn.: Howard Okland 333 West 7th Avenue, Suite 100 Anchorage, Alaska 99501 February 12,2004 RE: MWD Formation Evaluation Logs MPF-88, AK-MW-2816602 1 LIS formatted Disc with verification listing. API#: 50-029-23185-00 J (') '---I J ~ PLEASE ACKNOWLEDGE RECEIPT BY SIGNING A COpy OF THE TRANSMITTAL LETTER TO THE ATTENTION OF: Speny~Sun Drilling Services Attn: Rob Kalish 6900 Arctic Blvd. Anchorage, Alaska 99518 BP Exploration (Alaska) Inc. Petro-technical Data Center LR2-1 900 E. Benson Blvd. Anchorage, Alaska 99649-6612 . ~ -,,, Slgned: ~~\} t ..~\~~.J~~ Date: RECEIVED r 1 r¡ :!ou~4 ~ f ...... ... 7~la~Ÿ1!1 Oil &:Gas Cons. Com.rnisman "¥,~h~r... ,~~1 Ej!~t!~~~~ 1\'b~fY\~ Re: MPF-88 (203-193) Casing Program Change . It . Subject: Rc: MPF-88 (203-193) Casing Program Change From: Thomas Maunder <tom maunder(i~admin.state.ak.lIs> - - Date: Wed, 17 Dec 2003 16:07:26 -0900 To: "Quay, Walter (Natchiq)" <QuayWD@BP.com> CC: "Archey, Pat" <ArcheyPJ@BP.cam>, "Stewman, Sandra 0" <StewmaSD@BP.com>, "West, Howard J (Schlumbcrger)" <westhj@BP.com> Walter, et al: Thanks for the information regarding the changes in MPF-88. I will place this note in the well file. No further information is needed. Tom Maunder, PE AOGCC Quay, Walter (Natchiq) wrote: Tom, As per our conversation, the following casing program changes are planned for MPF-88 (#203-193): 1. 711 Longstring will be set at -11,930' (69911 TVD) and cemented to 500' above the shoe. Est. Cmt of 20 Bbls of 15.8 ppg G, ( 97 SX) 2. 4-1/211 Liner set at the same previous TD for the 71'.. 12,3571 MD (7340' TVD). Top of liner -150' above 711 shoe @ 11,780' . Est. Cement Volume of 18.5 Bbls 15.8 ppg Latex G (86 Sx) Bottom Hole location is unchanged from the permitted plan. Walter Quay 9.!!.~~S!.C§ì.~.E..:...S:.?~ (907)564-4178 (907)440-8632 - Cell 1 of 1 12/17/20034:07 PM . . FRANK H. MURKOWSKI, GOVERNOR AIfA.SIiA ORAND GAS CONSERVATION COMMISSION 333 W. 7'" AVENUE, SUITE 100 ANCHORAGE, ALASKA 99501·3539 PHONE (907) 279·1433 FAX (907) 276·7542 Pat Archey Senior Drilling Engineer BP Exploration (Alaska), Inc. PO Box 196612 Anchorage AK 99519 Re: Milne Point Unit MPF-88i BP Exploration (Alaska), Inc. Permit No: 203-193 Surface Location: 2138' NSL, 2906' WEL, Sec. 06, TI3N, RlOE, UM Bottomhole Location: 727' NSL, 3650' WEL, Sec. 30, TI4N, RI0E, UM Dear Mr. Archey: Enclosed is the approved application for permit to drill the above development well. This permit to drill does not exempt you from obtaining additional permits or approvals required by law from other governmental agencies, and does not authorize conducting drilling operations until all other required permits and approvals have been issued. In addition, the Commission reserves the right to withdraw the permit in the event it was erroneously issued. Operations must be conducted in accordance with AS 31.05 and Title 20, Chapter 25 of the Alaska Administrative Code unless the Commission specifically authorizes a variance. Failure to comply with an applicable provision of AS 31.05, Title 20, Chapter 25 of the Alaska Administrative Code, or a Commission order, or the terms and conditions of this permit may result in the revocation or suspension of the permit. Please provide at least twenty-four (24) hours notice for a representative of the Commission to witness any required test. Contact the Commission's North Slope petroleum field inspector at 659-3607 (pager). Sincerely, Q/ /l . ~I-~ c:- ~ Sarah Palin Chair BY ORDER OF THE COMMISSION DATED this~ day ofN8.tmhcr, 2003 D.e. Ce ¡;JJ3~ r cc: Department ofFish & Game, Habitat Section w/o encl. Department of Environmental Conservation w/o encl. Exploration, Production and Refineries Section , . . STATE OF ALASKA . ALASKA 0 a;;; NO GAS CONSERVATION COM SION PERMIT TO DRILL 20 MC 25.005 '-'y. )~ 1a. Type of work BDrill o Redrill rb. Current Well Class o Exploratory o Development Oil (3 Multiple Zone ORe-Entry o Stratigraphic Test B Service o Development Gas Single Zone ,jJ) 2. Operator Name: 5. Bond: !HI Blanket o Single Well 11. Well Name and Number: BP Exploration (Alaska) Inc. Bond No. 2S 100302630-277 MPF-88i 3. Address: 6. Proposed Depth: 12. Field / Pool(s): P.O. Box 196612, Anchorage, Alaska 99519-6612 MD 12357 TVD 7340 Milne Point Unit / Kuparuk River 4a. Location of Well (Governmental Section): 7. Property Designation: Sands Surface: 1. s>d? I ADL~3Ç>D'~ 2138' NSL, 2906' WEL, SEC. 06, T13N, R10E, UM Top of Productive Horizon: 8. Land Use Permit: 13. Approximate Spud Date: 580' NSL, 3691' WEL, SEC. 30, T14N, R10E, UM 12-10-03 Total Depth: 9. Acres in Property: 14. Distance to Nearest Property: 727' NSL, 3650' WEL, SEC. 30, T14N, R10E, UM 2560 9975' 4b. Location of Well (State Base Plane Coordinates): 10. KB Elevation Planned = 15. Distance to Nearest Well Within Pool Surface: X-541656 y-6035589 Zone¡6.SP4 (Height above GL): 45.2' feet 1310' away from MPF-53 16. Deviated Wells: 17. Anticipated pressure (see 20 MC 25.035) Kickoff Depth 300' ft Maximum Hole Angle 63 0 Max. Downhole Pressure: 2133 psig. Max. Surface Pressure: 1426 psig 18.Çasinggrogram Specifications i< (.J9íåntitypt t;ement Size '¥CIP - '. 'Bòt om (c.f.orsacks) Hole Casina Weiaht Grade Couplina Lenath MD TVD MD TVD (includina staae data) 42" 20" 92# H-40 Weld 122' Surface Surface 122' 122' 1260 sx Arctic Set (Approx.) 12-1/4" 9-5/8" 40# L-80 BTC-M 7609' Surface Surface 7609' 4445' 749 sx Lite Crete, 1052 sx Class 'G' 8-3/4" 7" 26# L-80 1dC%' 12357' Surface Surface 12357' 7340' 185 sx Class 'G' S"'v-Þ\ 19. PRESENT WELL CONDITION SUMMARY(To be completed for Redrill AND Re-entry Operations) Total Depth MD (ft): Total Depth TVD (ft): Plugs (measured): I Effective Depth MD (ft): I Effective Depth TVD (ft):1 Junk (measured): ""6."i...",·· < ·I.o!engt!'l< .... " SiZØ\ ..... 'i <. <"v''.!'"'''' /. ....... , fØO 'I'\Ip . Stp I~h I r;:¡ I ConnlJdor ~llrf"'N> , ~. Production I inAr Perforation Depth MD (ft): IPerfOration Depth rvD (ft): 20. Attachments !HI Filing Fee o BOP Sketch !HI Drilling Program o Time vs Depth Plot o Shallow Hazard Analysis o Property Plat o Diverter Sketch o Seabed Report o Drilling Fluid Program !HI 20 MC 25.050 Requirements 21. Verbal Approval: Commission Representative: Date: 22. I hereby certify that the foregoing is true and correct to the best of my knowledge. Contact Matt Green, 564-5581 Printed Name Pat Archey Title Senior Drilling Engineer P '5 {L" cl...J'-/ Prepared By Name/Number: Sianature Phone 564-5803 Date I ¡J¡7/¿"3. Sondra Stewman, 564-4750 ....,........ ........,....ii; ,¡.p...... < <·,Ii . <. li\i";'it .' ··.·.·.··.i i«·ii~:. .i i< / Permit To Drill 3_/93 APINumber: 2¿j/~-ðO Permit APproval]. hhø I See cover.letter for Number: 2.0 50- (j2... 'f ~ Date: ¡ other reqUirements Conditions of Approval: Samples Required ~es gNo Mud Log Requirecf I W:S NNo Hydrogen Sulfide Measures Yes 0 No Directional Survey Required Yes tJ No Other: 35'00 ~o;\ ~O\' -\tt.~-\--, ~ \\ Q ~""'~"'\ Cy.'v~\~\--'í \ o~ Original Signed By BY ORDER OF /,Î,~A~ ADDroved Bv: Sarah Palin (")- I&NEIA I THE COMMISSION Date Form 10-401 Revised 3/2003 t) \jtJII\!!-\L Submit (n Dúplicate e ene Point MPF-88 Well Permit I Well Name: I MPF-88 Drill and Complete Plan Summary ./ 1 Type of Well (service I producer I injector): I Injector Surface Location: 3142' FNL, (2138' FSL), 2906' FEL, (2253' FWL), SEC. 6, T13N, R10E E=541655.92 N=6035588.83 Target Location: 4699' FNL, (580' FSL), 3691' FEL, (1429' FWL), SEC. 30, T14N, R10E Top A-Sand E=540785 N=6044585 Z= 7075-ft TVDss Target Location: 4553' FNL, (727' FSL), 3650' FEL, (1469' FWL), SEC. 30, T14N, R10E BHL A-Sand Well TD E=540824 N=6044732 Z=7295-ft TVDss I AFE Number: I 1 Rig: 1 Doyon 14 1 Estimated Start Date: 11 0-Dec-2003 1 Operating days to complete: 123.0 ~112,357 I 1 TVD: 17,340 1 1 Max Inc: []Ð 1 KOP: 1300 I I KBE:145.2 1 Well Design (conventional, slim hole, etc.): I Conventional Injector I Objective: I Kuparuk A-Sand Mud Program: 12.S-in Suñace Hole Mud Pro erties: Densit Funnel Vis YP HTHP 8.6 - 9.5 75 -150 25 - 60 N/A S ud - LSND Freshwater Mud H API Filtrate LG Solids 9.0 - 9.5 < 12 < 15 S.7S-in Intermediate Hole Mud Pro erties: Densit PV YP HTHP ./ 9.0-9.2 10-20 22-28 N/A LCM Restrictions: None. Waste Disposal: NO ANNULAR INJECTION. Drill Cuttings taken to D8-4 disposal site Call the Pad 4 waste disposal site prior to truck leaving location so the site can be ready to unload waste. Exempt liquid wastes can be taken to DS-4 or Phillips KRU 1 R. LSND Freshwater Mud H API Filtrate LG Solids 9.0 - 9.5 < 8 < 12 1 e ene Point MPF-88 Well Permit Cement Program: Casin Size 9.625-in 40.0-lb/ft L-80 BTC-M Surface Casin Basis 250% excess over gauge hole in permafrost. 40% excess over au e hole below ermafrost. Cement to surface. Tail below ermafrost at 3,000-ft MD. Total Cement Volume: 770-bbl Wash 5-bbl water Lead 30-bbI10.2-lb/ al S acer / 554-bbl, 749-sx 10.7 Ib/gal LiteCrete - 4.15 ft Isx to of lead at su rface ../ 216-bbl, 1052-sx 15.6 Ib/gal Prem G - 1.22 ft /sx to of lead at 3,000-ft MD BHST == 175°F from SOR S acer Tail Tern Casing Size 17.0-in 26.0-lb/ft L-80 NSCT Intermediate CasinQ Basis 140% excess over gauge hole. Lead 500-ft MD above top of Kuparuk D-Sand. Total Cement Wash 5-bbl water Volume: 40-bbl Spacer 30-bbl 10.2-lb/Qal Spacer /' ,.^...-w,,±^·^»^· Lead 40-bbl, 185-sx 15.6 Ib/gal Prem G - 1.22 ft;;!/sx (top of lead at 11 ,373-ft MD) Temp BHST == 175°F from SOR Evaluation Program: 12.5-in Section Open Hole: Cased Hole: 8.75-in Section Open Hole: MWD/GRlR WD CASANDRA Cased Hole: N/A 2 e _ne Point MPF-88 Well Permit Formation Markers: ~ Formation Tops MDrkb TVDrkb Pore Pressure Estimated EMW (ft) (ft) (psi) (I bIg a 1)* BPRF 1893 1745 ..... J TUlC 5430 2470 8.35 1487 SBF2-NA 6686 4032 8.35 1731 SBA5 7340 4325 8.35 1858 KLGM 11792 6880 "- TKUD 11873 6945 / '\ TKUC 12042 7082 / 5.8 \ 2122 TKUB 12052 7090 5.8 \ 2125 TKUA 12086 7118 5.8 2133 TKA3 12091 7122 5.8 2134 TKA2 12110 7137 5.8 / 2139 TKA1 12137 7159 \ 5.8 / 2146 TMLV 12207 7217 '-- ./ +- ~ S'11:;:. (2 T"\\'C~ CasingITubing Program: Hole Csg WtI Grade Conn Burst Collapse Length Top Bottom Size Diam Ft MDfTVDrkb MDfTVDrkb 42-in 20-in* 92 H-40 Weld 1530 520 122-ft 0 122-ft / 122-ft 12.25-in 9.625-in 40 L-80 BTC-M 5750 3090 7,609-ft 0 7,609-ft / 4,445-ft 8.75-in 7.0-in 26 L-80 BTC-M 7240 5410 12,357-ft 0 12,357-ft/ 7,340-ft *The 20-in casing is NOT insulated Recommended Bit Program: BHA Hole Size Depth (MD) Bit Type Nozzle/Flow rate 1 12.25 0- 7,609-ft Hughes 3-15's & 1-10 MX-C1 2 8.75-in 7,608 - 12,357-ft Hycalog 6-14's DS-70 450 - 600-Qpm 3 e ene Point MPF-88 Well Permit Well Control: Intermediate and Production Intervals · Maximum anticipated BHP: 2133-psi @ 7,073-ft TVDss - Top of Kuparuk A-sand · Maximum surface pressure: 1,426-psi @ surface ' (Based on BHP and a full column of gas from TD @ O.1-psi/ft) · Planned BOP test pressure: Diverter will be function tested. BOPs: Test annular 250-psi low -and 2,500-psi high, and rams to 250-psi low and 3,500-psi high. An FIT to 12.4-lb/gal will be made at the 9.625-in casing shoe. Infinite with 9.0-lb/gal mud and FIT of 11.5-lb/gal @ 9.625-in shoe. 9.2-lb/gal NaCI/ 6.8-lb/gal Diesel · Integrity test: · Kick tolerance: · Planned completion fluid: Drilling Hazards & Contingencies: Lost Circulation · The possibility of lost circulation is moderate on MPF-88 in the under-pressured fault block. · Follow the LOST CIRCULATION DECISION MATRIX in the well plan if fluid losses occur while drilling. Break circulation slowly in all instances and get up to recommended circulating rate slowly prior to cementing. Expected Pressures · It is unlikely there will be unexpected overpressure when drilling through the Schrader Bluff. The reservoir pressures in the Kuparuk formations of the target fault block ar; under-pressured on MPF-88. The reservoir pressure is predicted to be 5.8-lb/gal equivalent. Pad Data Sheet · Please read the F-Pad Data Sheet thoroughly. Breathing · Wellbore breathing is a low possibility with the minimal mud density planned. Good operating practices to minimise ECD and surge/swab pressures should be employed. Hydrocarbons · Hydrocarbons will be encountered in the Kuparuk sands. The Schrader Bluff may contain Hydrocarbons. r- - ...---- <...()'-)I't.'(""(t~ '0" Ç.~~ Cß.~\~ Faults ') · 140-ft down to south fault in Middle Colville at 11 ,300-ft MD. 4 e elne Point MPF-88 Well Permit Hydrogen Sulfide · MPF-Pad is not designated as an H2S Pad, however Standard Operating Procedure for H2S precautions should be followed at all times. #1 Closest SHL H2S Level #2 Closest SHL H2S Level #1 Closest BHL H2S Level #2 Closest BHL H2S Level #3 Closest BHL H2S Level Max. Recorded H2S Level on F-Pad 6.7 ppm on MPF-92, Sep 2003 <2 ppm on MPF-85, Sep 2003 32 ppm on MPF-53, Sep 2003 <2 ppm on MPF-45, Feb 2001 16.4 ppm on MPF-62, Feb 2001 47 ppm on MPF-69, Sep 2003 Anti-collision Issues · Close approach to MPF-54 and MPF-38. Distance to Nearest Property · MPF-88 is 9,975-ft from the nearest Milne Point property line. Distance to Nearest Well Within Pool · MPF-88 is 1,31 O-ft from the Kuparuk A-sand penetration in MPF-53. 5 e DRILL & COMPLETION PROCEDURE elne Point MPF-88 Well Permit Drilling Procedure with Doyon-14 1. MO/RU Doyon 14. 2. Drill 12.25-in hole as per directional plan. 3. Run and cement 9.625-in casing. Test casing. 4. Drill out cement and 20-ft new formation and perform FIT. 5. Drill 8.75-in hole as per directional plan. 6. Run and cement 7.0-in casing to TO. Test casing. 7. Run 4.5-in completion as per schematic. 8. Land tubing hanger and test. 9. NO BOP. NU tree and test. 10. Freeze protect both annuli. 11. RD/MO. Completion Procedure 1. RU Schlumberger e-line. 2. SCMT log. 3. Perforate A-sands in sequence, determine pressure of each sand. 4. RD Schlumberger. 6 Iœ.e.;. 4-1/16"-5KFMC -MPF 88 Wellhead: 11" x 4.5" 5K Gen 6" - wI 4.5" TCII T&B Tubing Hanger CIW "H" BPV profile 20" 91.1-lblft H-40 [JJÐ 9.625-in 40-lb/ft L-80 BTC-M casing 17609' I , 7.0-in 26-lb/ft L-80 BTC-M casing (drift ID = 6.151", cap = 0.0383-bbl/ft) 4.5" 12.6# L-80 IBT-M tubing Perforated Kuparuk A-sands 7.0-in Casing Shoe 12,357' Proposed _lev. = 45.2-ft GL. elev.= 11.4-ft DATE REV. BY COMMENTS MDG Proposed Kuparuk Injector 17 -Nov-03 KOP @ 300' Max hole angle in tubing = 63 degree 4.5" HES "XD" Dura sliding sleeve 4.5" HES XN-Nipple 7.0" x 4.5" Baker Premier Packer 111,900'1 4.5" HES XN-Nipple WLEG MILNE POINT UNIT WELL MPF-88 API NO: 50-029-????? J3~ EXPLORATION (AK) bp o No. TVD MD Name Size SURVEY PROGRAM Plan: MPF·88 "-'p03 (Plan MPF·88,'Plan MPF-88) Ikr1hFrn DepthÚ. Survcy,'l'lan T\'\'I Created By: Ken Allen Date: 9/26/2003 34.00 \Uoo.no Planned; MPF-K8 ....-pO] \'5 Cß-GYRO-SS Checked: Date:~ lOoo.O() 12357.:n Planned: MPF-88 .....1'10] \'5 MWD+ IFR +MS Reviewed: Date:~ WELL DETAILS Nallle tN/·S t[).W Northing ""'""" Latitudo: longítud.: 511\! Plan MPf·88 5:"88.72 9866.47 6<05588.83 541655.9] 70"]O'29J37N 14tJ"39'1103IW 88 TARGET DETAILS Name TVD I-N/-S +Fj·W Northing [a:,1ing Shapl: MPF·88 T1 7120.20 <)001.81 ·820.50 6044585.01 :"4078....04 P¡.IYtllln SECTION DETAILS Sec MD Inc Azi TVD +N/·S +E/·W DLeg TFace VSec Target I 34.00 0.00 0.00 34.00 0.00 0.00 0.00 0.00 0.00 2 300.00 0.00 0.00 300.00 0.00 0.00 0.00 0.00 0.00 3 400.00 2.00 333.00 399.98 1.55 ·0.79 2.00 333.00 1.62 4 1466.67 34.00 333.00 1401.31 291.44 ·148.50 3.00 0.00 303.01 5 1831.77 38.00 347.00 1697.13 492.33 ·220.28 2.50 69.87 509.28 6 1958.51 38.00 347.00 1797.00 568.36 ·237.83 0.00 0.00 586.52 7 2616.02 63.41 356.00 2210.50 1067.65 ·305.05 4.00 18.40 1089.71 8 5616.02 63.41 356.00 3553.31 3743.81 ·492.19 0.00 0.00 3772.10 e 9 5697.92 63.41 352.34 3589.98 3816.64 ·499.63 4.00 ·90.84 3845.30 10 8802.60 63.41 352.34 4979.69 6568.13 ·869.85 0.00 0.00 6618.30 11 12088.91 35.00 15.00 7120.20 9001.81 ·820.50 1.00 155.97 9038.98 MPF·88 T1 12 12207.33 35.00 15.00 7217.20 9067.42 ·802.92 0.00 0.00 9102.85 13 12357.33 35.00 15.00 7340.07 9150.52 ·780.66 0.00 0.00 9183.76 COMPANY DFlAII S R]T!JU~N('!: IN -,()RMAIION BI'Allh'I."" t.','-\'rdinate (N'n Râcl\.'I1C"': Wdl ('colIc: Plan MPF-RX, True NI1t1h '\:rtkal (lVD) Rdì.:r~'nl·"': 4~,20' 4S.20 ~"'I!{'n {VSJ K...t'"çr...uœ: Sl"t - 88 (o.nON,O.UHE¡ M~\sur...'1i J'>':pth Rckr...'f1......: 4~.20· 4S.]:O ('akulation M.....bod: Minìmum Curv:\tur.: ('aku!atil'n M..:t!w..l: r..HninmIU ('urvan!rc Em1f SV.'\I...'1u: [SCWSA S..:an Method: Ira\" Cylinder N,'rth LrrwSutf;iCe: El1iplkal t C;\Sing Warnin Meth\1d: Ruk~ Bas......! End Di, : 1831.77' MD. 1697.13'TVD . Start Di, 4/100': 1958.51' MD. 1797TVD FORMATION TOP DETAILS No. TV D Path MDPath Formation 1 1745.20 1892.78 BPRF 2 3470.20 5430.34 TUZC 3 4032.20 6685.86 SBF2·NA 4 4325.20 7340.44 SBA5 5 6880.20 1179\.62 KLGM 6 6945.20 11873.03 TKUD 7 7082.20 12042.42 TKUC 8 7090.20 12052.23 TKUB 9 7118.20 12086.47 TKUA 10 7122.20 12091.36 TKA3 II 7137.20 12109.67 TKA2 12 7159.20 12136.52 TKAI 13 7217.20 12207.33 TMLV CASING DETAILS o Start Dir 2/1 00' : 300' MD, 300TVD Start Dir 3/100': 400' MD, 399.98TVD 120 StartDir2.5/100·: 1466.67'MD.140IJI'TVD 4445.20 7608.52 95/8" 7340.06 12357.32 7" 9.625 7.000 : 2616.02' MD, 2210S TVD 2400- --------_.__.~ :? 2 o o 0' -E 360 c. 8 Start Dir4/100': 5616.02' MD. 3553JI'TVD __ End Di, : 5697.92' MD, 3589.98' TVD " u 1:: ;;; 2 ¡-. 600 I All TVD depths are ssTVD plus 45.20'for RKBE. I I I ,." l I I ; I ,! ~ ;I .1# ;< 480 720 KLGM TKUD I i TKUC , End Dir : 12088.91' MD, 7120.2' TVD /' ,cj / Total Depth: 12357.33' MD. 7340.07' TVD MPF·88 wp03 7" o 1200 I ' 2400 3600 4800 6000 Vertical Section at 355.12° [I 200ft/in] 7200 8400 9600 10800 bp ..~ \.J ('()MPANY])FIAII.S BI'..\nwe,' Cakula!i,'u M..-th"J: Minimum Curvalllr~ Err<'! Svsk'lIl: I~CWSt\ Sc,m ~í.:th,'d: Tr¡iV (\'hnd~r N,'rth Erwr Surface: Elliplk:11 Casing Wamin Mcth,'d: Rules B:Jscd 7" 95i conr. -c-' 900Q~ -~PT!-WTr= ! 7000 6500 750 600 c § ô?, +" Ê 450 ~ ~ o VJ 3QOQ- 150 i i 6000 i i '---1-))ô(j I ! i i I I i t-- i I I I I i i 4000 -+----~ i i i I I I I i 5000 4500 o I I i i i I I I 2500 -l· ---- ~-- I I I I I I I I 1------- i ! -1500 IŒITRFNCE INfORM¡\'[ ()N (·"·,'rdinat.: (N;E) Rd~rcnœ: "Veil CI.->J1tr\.': Plan MI'I"X ( Trtle N,'rth \\:rtic,11 (n'D1 Rdì..'TCnœ: 4....20' 4:'.20 &'l:til.n (VS) Rd'.:rcocc: Sh'!· R!< /O.(¡oN.O,OOL¡ M':;:I~red Dcplh RcJ~n..'Ilœ: 4.".20' 45.20 Cakulatil'n Mcth,'d: Minimum Curvature FORMATION TOP DETAILS No. TVDPath MDPath Fonnation 1 1745.20 1892.78 BPRF 2 3470.20 5430.34 TUZC 3 4032.20 6685.86 SBF2·NA 4 4325.20 7340.44 SBA5 5 6880.20 11791.62 KLGM 6 6945.20 11873.03 TKUD 7 7082.20 12042.42 TKUC 8 7090.20 12052.23 TKUB 9 7118.20 12086.47 TKUA 10 7122.20 12091.36 TKA3 11 7137.20 12109.67 TKA2 12 7159.20 12136.52 TKAI 13 7217.20 12207.33 TMLV CASING DETAILS No. TVD MD Name Size 4445.20 7608.52 95/8" 9.625 7340.06 12357.32 7" 7.000 Total Depth: 12357.33' MD, 7340.07' TVD MPF·88 wp03 End Dir : 12088.91' MD, 7120.2' TVD Start Dir 11100' : 8802.6' MD, 4979.69'TVD 95/8" 3500 End Dir : 5697.92' MD, 3589.98' TVD Start Dir4/100': 5616.02' MD, 3553.31'TVD 3000 All TVD depths are ssTVD plus 45.20'for RKBE. 2000 End Dir : 2616.02' MD, 2210.5' TVD $tart Dir 411 00' : 1958.51' MD, 1797'TVD 1500 Jnd Dir : 1831.77' MD, 1697.13' TVD 1000 Start Dir 2.51100': 1466.67' MD, 1401.3I'TVD '·---·'300 '~Start Dir 31100': 400' MD, 399.98'TVD ! Start Dir 21100': 300' MD, 300'TVD I I o 1500 W est(· )/East( +) [1500ftlinJ 3000 S!JRVFY PROCiR:\M Plan: MPF·ßß wp03 (Plan MPF-8ßfPlan MPF-ß8¡ Depth I'm ])...,.,th 1,. Survcy/Plan 34.00 1000.00 PlaJmcd: MPF·~R wpo.1 V:' 1000JJ(1 12.1:'7J.1 Planned: MPF-R8 wpnJ V:' l,,,,t Created By: Ken Allen Checked' Date Date: 9/26/2003 rU-GYRO-SS MWDllFRtMS Rniewed' Date:~ WELL DETAIl.S Nam<.': tNi_S tE/-W N'lt1hitw Easting Latituok 1.,'ngilUdc St,'t Plan MPF-88 :'588.72 9866.47 60.1:'588.8.1 5416:'5.93 7W.10'29J.17N 149')39'.BJHIW 88 tARGET DETAILS Narn<.': TVD +-N/-S tl>W Northing Easting Sha~ MPF-8STI 712u.20 90(}1.81 -820.:'0 6044:'85,01 54078:'.04 P,'lnwn SECTION DETAILS Sec MD Inc Azi TVD +N/·S +E/·W DLeg TFace VSec Target I 34.00 0.00 0.00 34.00 0.00 O.OQ 0.00 0.00 0.00 2 300.00 0.00 0.00 3QO.00 0.00 0.00 0.00 O.QO 0.00 3 40Q.00 2.00 333.00 399.98 1.55 ·0.79 2.00 333.00 1.62 4 1466.67 34.00 333.00 1401.31 291.44 ·148.50 3.00 0.00 303.01 5 1831.77 38.00 347.QO 1697.13 492.33 ·220.28 2.50 69.87 509.28 6 1958.51 38.00 347.00 1797.00 568.36 ·237.83 0.00 0.00 586.52 7 2616.02 63.41 356.QO 2210.50 1067.65 ·305.05 4.00 18.40 1089.71 8 5616.02 63.41 356.00 3553.31 3743.81 ·492.19 0.00 0.00 3772.10 e 9 5697.92 63.41 352.34 3589.98 3816.64 ·499.63 4.00 ·90.84 3845.30 10 8802.60 63.41 352.34 4979.69 6568.13 ·869.85 0.00 0.00 6618.30 II 12088.91 35.00 15.00 7120.20 9001.81 ·820.50 1.00 155.97 9038.98 MPF·88 Tl 12 12207.33 35.QO 15.00 7217.20 9067.42 ·802.92 0.00 0.00 9102.85 13 12357.33 35.00 15.00 7340.07 9150.52 ·780,66 0.00 0.00 9183.76 o e l I I l I I ~ I' ¿fie§' ;" / /°oCb /~ 9000 6'000 ~O ÔOOO $oCbo ~I ¡ '000 /' ->bOO ';>000 /O~ ~ '/O~ ~ e BP KW A Planning Report e Company: Field: Site: Well: BP Amoco Milne Point M Pt F Pad Plan MPF-88 Plan MPF-88 Date: 9/26/2003 Time: 06:48:56 Page: Co-ordinate(NE) Reference: Well: Plan MPF-88. True North Vertical (fVD) Reference: 45.20' 45.2 Section (VS) Reference: Well (0.00N.0.00E.355.12Azi) Calculation Method: Minimum Curvature Db: Oracle Field: Milne Point North Slope UNITED STATES Map System:US State Plane Coordinate System 1927 Geo Datum: NAD27 (Clarke 1866) Sys Datum: Mean Sea Level Map Zone: Coordinate System: Geomagnetic Model: Alaska, Zone 4 Well Centre bggm2003 Site: M Pt F Pad TR-13-10 UNITED STATES: North Slope Site Position: Northing: From: Map Easting: Position Uncertainty: 0.00 ft Ground Level: 0.00 ft 6029958.49 ft 531814.44 ft Latitude: 70 29 Longitude: 149 44 North Reference: Grid Convergence: 34.438 N 23.616 W True 0.25 deg Well: Plan MPF-88 Slot Name: 88 70 30 29.337 N 149 39 33.031 W Well Position: +N/-S 5588.72 ft Northing: 6035588.83 ft +E/-W 9866.47 ft Easting: 541655.93 ft Position Uncertainty: 0.00 ft Latitude: Longitude: Plan MPF-88 Drilled From: Tie-on Depth: Above System Datum: Declination: Mag Dip Angle: +E/-W ft 0.00 Well Ref. Point 34.00 ft Mean Sea Level 25.15 deg 80.86 deg Direction deg 355.12 Height 45.20 ft 45.20' 7/31/2003 57530 nT Depth From (TVD) ft 34.00 Current Datum: Magnetic Data: Field Strength: Vertical Section: +N/-S ft 0.00 Date Composed: Version: Tied-to: 7/31/2003 5 From Well Ref. Point MPF-88 wp03 Yes TVD Diameter Hole Size Name ft in in 4445.20 9.625 12.250 95/8" 7340.06 7.000 8.500 7" MD TVD Formations Lithology Angle Dip Direction ft ft deg 1892.78 1745.20 BPRF 0.00 0.00 5430.34 3470.20 TUZC 0.00 0.00 6685.86 4032.20 SBF2-NA 0.00 0.00 7340,44 4325.20 SBA5 0.00 0.00 11791.62 6880.20 KLGM 0.00 0.00 11873.03 6945.20 TKUD 0.00 0.00 12042.42 7082.20 TKUC 0.00 0.00 12052.23 7090.20 TKUB 0.00 0.00 12086.47 7118.20 TKUA 0.00 0.00 12091.36 7122.20 TKA3 0.00 0.00 12109.67 7137.20 TKA2 0.00 0.00 12136.52 7159.20 TKA1 0.00 0.00 12207.33 7217.20 TMLV 0.00 0.00 Map Map <- Latitude --> <- Longitude -> Name Description TVD +N/-S +E/-W Northing Easting Deg Min Sec Deg Min Sec Dip. Dir. ft ft ft ft ft MPF-88 T1 7120.20 9001.81 -820.50 6044585.01 540785.04 70 31 57.867 N -Polygon 1 7120.20 9203.09 -1044.40 6044785.01 540560.04 70 31 59.846 N -Polygon 2 7120.20 9027.77 -990.38 6044610.01 540615.04 70 31 58.122 N Company: Field: Site: Well: Wellpath: Targets BP Amoco Milne Point M pt F Pad Plan MPF-88 Plan MPF-88 Name Description Dip. Dir. -Polygon 3 -Polygon 4 -Polygon 5 -Polygon 6 -Plan hit target Plan Section Information MD ft 34.00 300.00 400.00 1466.67 1831.77 1958.51 2616.02 5616.02 5697.92 8802.60 12088.91 12207.33 12357.33 Survey MD ft 34.00 100.00 200.00 300.00 400.00 500.00 600.00 700.00 800.00 900.00 1000.00 1100.00 1200.00 1300.00 1400.00 1466.67 1500.00 1600.00 1700.00 1800.00 1831.77 1892.78 1900.00 1958.51 2000.00 2100.00 2200.00 2300.00 2400.00 2500.00 Incl deg 0.00 0.00 2.00 34.00 38.00 38.00 63.41 63.41 63.41 63.41 35.00 35.00 35.00 Incl deg 0.00 0.00 0.00 0.00 2.00 5.00 8.00 11.00 14.00 17.00 20.00 23.00 26.00 29.00 32.00 34.00 34.29 35.27 36.37 37.59 38.00 38.00 38.00 38.00 39.58 43.40 47.25 51.11 54.99 58.88 Azim deg 0.00 0.00 333.00 333.00 347.00 347.00 356.00 356.00 352.34 352.34 15.00 15.00 15.00 Azim deg 0.00 0.00 0.00 0.00 333.00 333.00 333.00 333.00 333.00 333.00 333.00 333.00 333.00 333.00 333.00 333.00 334.39 338.43 342.26 345.89 347.00 347.00 347.00 347.00 347.82 349.60 351.14 352.50 353.71 354.82 TVD ft 7120.20 7120.20 7120.20 7120.20 ft 34.00 300.00 399.98 1401.31 1697.13 1797.00 2210.50 3553.31 3589.98 4979.69 7120.20 7217.20 7340.07 TVD ft 34.00 100.00 200.00 300.00 399.98 499.78 599.13 697.74 795.36 891.72 986.54 1079.57 1170.55 1259.24 1345.40 1401.31 1428.89 1511.04 1592.13 1672.02 1697.13 1745.20 1750.89 1797.00 1829.34 1904.24 1974.53 2039.89 2099.98 2154.53 e BP KW A Planning Report +N/-S ft 8782.47 8741.17 8975.94 9146.26 +N/-S ft 0.00 0.00 1.55 291.44 492.33 568.36 1067.65 3743.81 3816.64 6568.13 9001.81 9067.42 9150.52 Sys TVD ft -11.20 54.80 154.80 254.80 354.78 454.58 553.93 652.54 750.16 846.52 941.34 1034.37 1125.35 1214.04 1300.20 1356.11 1383.69 1465.84 1546.93 1626.82 1651.93 1700.00 1705.69 1751.80 1784.14 1859.04 1929.33 1994.69 2054.78 2109.33 e Date: 9/26/2003 Time: 06:48:56 Page: 2 Co-ordinate(NE) Reference: Well: Plan MPF-88, True North Vertical (TVD) Reference: 45.20'45.2 Section (VS) Reference: Well (0.00N,0.00E,355.12Azi) Survey Calculatioll Method: Minimum Curvature Db: Oracle +E/-W ft -941.75 -711.95 -665.63 -719.68 +E/-W ft 0.00 0.00 -0.79 -148.50 -220.28 -237.83 -305.05 -492.19 -499.63 -869.85 -820.50 -802.92 -780.66 Map Northing ft 6044365.01 6044325.01 6044560.01 6044730.01 Map Easting ft 540665.04 540895.04 540940.04 540885.04 DLS Build Turn deg/100ft deg/100ft deg/1000 MapN ft 6035588.83 6035588.83 6035588.83 6035588.83 6035590.38 6035595.80 6035605.85 6035620.51 6035639.74 6035663.48 6035691.66 6035724.22 6035761.05 6035802.07 6035847.15 6035879.40 6035896.13 6035948.26 6036003.24 6036060.97 6036079.87 6036116.41 6036120.74 6036155.79 6036181.12 6036246.00 6036316.02 6036390.85 6036470.11 6036553.43 0.00 0.00 2.00 3.00 2.50 0.00 4.00 0.00 4.00 0.00 1.00 0.00 0.00 0.00 0.00 2.00 3.00 1.10 0.00 3.86 0.00 0.00 0.00 -0.86 0.00 0.00 MapE ft 541655.93 541655.93 541655.93 541655.93 541655.13 541652.33 541647.13 541639.56 541629.63 541617.36 541602.80 541585.98 541566.95 541545.77 541522.48 541505.81 541497.43 541474.34 541454.38 541437.58 541432.92 541424.26 541423.24 541414.94 541409.14 541395.84 541383.59 541372.43 541362.41 541353.60 0.00 0.00 0.00 0.00 3.83 0.00 1.37 0.00 -4.47 0.00 0.69 0.00 0.00 VS ft 0.00 0.00 0.00 0.00 1.62 7.27 17.76 33.04 53.09 77.85 107.24 141.18 179.60 222.37 269.38 303.01 320.43 374.44 431.01 490.03 509.28 546.46 550.86 586.52 612.28 678.10 748.95 824.49 904.34 988.12 <-- Latitude --> Deg Min Sec 70 31 55.710 N 70 31 55.304 N 70 31 57.613 N 70 31 59.288 N TFO deg 0.00 0.00 333.00 0.00 69.87 0.00 18.40 0.00 -90.84 0.00 155.97 0.00 0.00 DLS deg/100ft 0.00 0.00 0.00 0.00 2.00 3.00 3.00 3.00 3.00 3.00 3.00 3.00 3.00 3.00 3.00 3.00 2.50 2.50 2.50 2.50 2.50 0.00 0.00 0.00 4.00 4.00 4.00 4.00 4.00 4.00 Target MPF-88 T1 TFO deg 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 69.87 68.72 65.40 62.29 59.39 0.00 0.00 0.00 18.40 17.76 , 16.43 15.35 14.46 13.73 <- Longitude -> Deg Min Sec 149 40 0.799 W 149 39 54.023 W 149 39 52.658 W 149 39 54.253 W CB-GYRO-SS CB-GYRO-SS CB-GYRO-SS CB-GYRO-SS CB-GYRO-SS CB-GYRO-SS CB-GYRO-SS CB-GYRO-SS CB-GYRO-SS CB-GYRO-SS MWD+IFR+MS MWD+IFR+MS MWD+IFR+MS MWD+IFR+MS MWD+IFR+MS MWD+IFR+MS MWD+IFR+MS MWD+IFR+MS MWD+IFR+MS MWD+IFR+MS MWD+IFR+MS BPRF MWD+IFR+MS MWD+IFR+MS MWD+IFR+MS MWD+IFR+MS MWD+IFR+MS MWD+IFR+MS MWD+IFR+MS MWD+IFR+MS I I Company: I Field: I Site: : Well: I WeIlpath: Survey ,.---- ---------------- BP Amoco Milne Point M Pt F Pad Plan MPF-88 Plan MPF-88 MD ft -----_._-------_.__._---_._~-_._-_._~._--_..-. Azim deg Incl deg - _.-._----' --_._,-_..__.__._--~------._,......._-_...~-- 2600.00 2616.02 2700.00 2800.00 2900.00 3000.00 3100.00 3200.00 3300.00 3400.00 3500.00 3600.00 3700.00 3800.00 3900.00 4000.00 4100.00 4200.00 4300.00 4400.00 4500.00 4600.00 4700.00 4800.00 4900.00 5000.00 5100.00 5200.00 5300.00 5400.00 5430.34 5500.00 5600.00 5616.02 5697.92 5700.00 5800.00 5900.00 6000.00 6100.00 6200.00 6300.00 6400.00 6500.00 6600.00 6685.86 6700.00 6800.00 6900.00 7000.00 7100.00 7200.00 62.78 63.41 63.41 63.41 63.41 63.41 63.41 63.41 63.41 63.41 63.41 63.41 63.41 63.41 63.41 63.41 63.41 63.41 63.41 63.41 63.41 63.41 63.41 63.41 63.41 63.41 63.41 63.41 63.41 63.41 63.41 63.41 63.41 63.41 63.41 63.41 63.41 63.41 63.41 63.41 63.41 63.41 63.41 63.41 63.41 63.41 63.41 63.41 63.41 63.41 63.41 63.41 355.84 356.00 356.00 356.00 356.00 356.00 356.00 356.00 356.00 356.00 356.00 356.00 356.00 356.00 356.00 356.00 356.00 356.00 356.00 356.00 356.00 356.00 356.00 356.00 356.00 356.00 356.00 356.00 356.00 356.00 356.00 356.00 356.00 356.00 352.34 352.34 352.34 352.34 352.34 352.34 352.34 352.34 352.34 352.34 352.34 352.34 352.34 352.34 352.34 352.34 352.34 352.34 e BP KW A Planning Report e Date: 9/26/2003 Time: 06:48:56 Page: 3 Co-ordinate(NE) Reference: Well: Plan MPF-88. True North Vertical (TVD) Reference: 45.20' 45.2 Section (VS) Reference: Well (0.00N.0.00E.355.12Azi) Calculation Method: Minimum Curvature Db: Oracle TVD ft - ----------.------ ----.------,--------.-.-...------------ __u_o_ "'--.----~--~.,.____.._'""'._....________________~_.--....-w---------.-------.--.--------------.-.-..---l MapE VS DLS TFO Tool ft ft deg/1000 deg - -.-.----.-.-.---.----.---~"--" ..- --------------..--- ...----------".----.-.-.-.--~----.------..-.- '-·--"-·---·-~---·-·~.......c...-··_---··-·..···-··-..Ji ____._____...__u_,_.... 2203.25 2210.50 2248.09 2292.85 2337.61 2382.37 2427.13 2471.89 2516.65 2561.41 2606.17 2650.93 2695.69 2740.45 2785.21 2829.97 2874.73 2919.50 2964.26 3009.02 3053.78 3098.54 3143.30 3188.06 3232.82 3277 .58 3322.34 3367.10 3411.86 3456.62 3470.20 3501.38 3546.14 3553.31 3589.98 3590.91 3635.67 3680.43 3725.20 3769.96 3814.72 3859.48 3904.24 3949.00 3993.77 4032.20 4038.53 4083.29 4128.05 4172.81 Sys TVD ft 2158.05 2165.30 2202.89 2247.65 2292.41 2337.17 2381.93 2426.69 2471.45 2516.21 2560.97 2605.73 2650.49 2695.25 2740.01 2784.77 2829.53 2874.30 2919.06 2963.82 3008.58 3053.34 3098.10 3142.86 3187.62 3232.38 3277.14 3321.90 3366.66 3411.42 3425.00 3456.18 3500.94 3508.11 3544.78 3545.71 3590.47 3635.23 3680.00 3724.76 3769.52 3814.28 3859.04 3903.80 3948.57 3987.00 3993.33 4038.09 4082.85 4127.61 MapN ft 6036640.39 6036654.64 6036729.51 6036818.67 6036907.83 6036996.99 6037086.15 6037175.31 6037264.47 6037353.63 6037442.80 6037531.96 6037621.12 6037710.28 6037799.44 6037888.60 6037977.76 6038066.92 6038156.08 6038245.24 6038334.40 6038423.56 6038512.72 6038601.88 6038691.04 6038780.20 6038869.36 6038958.52 6039047.68 6039136.84 6039163.89 6039226.00 6039315.16 6039329.45 6039402.23 6039404.08 6039492.62 6039581.17 6039669.72 6039758.26 6039846.81 6039935.36 6040023.91 6040112.45 6040201.00 6040277.03 6040289.55 6040378.09 6040466.64 6040555.19 4217.58 4172.38 6040643.73 4262.34 4217.14 6040732.28 541346.02 541344.92 541339.27 541332.53 541325.79 541319.05 541312.32 541305.58 541298.84 541292.11 541285.37 541278.63 541271.89 541265.16 541258.42 541251.68 541244.94 541238.21 541231.47 541224.73 541217.99 541211.26 541204.52 541197.78 541191.05 541184.31 541177.57 541170.83 541164.10 541157.36 541155.31 541150.62 541143.88 541142.80 541134.96 541134.70 541122.28 541109.86 541097.44 541085.02 541072.60 541060.18 541047.76 541035.34 541022.92 541012.25 541010.50 540998.08 540985.66 540973.24 1075.42 1089.71 1164.80 1254.21 1343.62 1433.04 1522.45 1611.86 1701.27 1790.69 1880.10 1969.51 2058.93 2148.34 2237.75 2327.16 2416.58 2505.99 2595.40 2684.81 2774.23 2863.64 2953.05 3042.47 3131.88 3221.29 3310.70 3400.12 3489.53 3578.94 3606.07 3668.36 3757.77 3772.10 3845.30 3847.16 3936.48 4025.79 4115.11 4204.43 4293.74 4383.06 4472.38 4561.69 4651.01 4727.70 4740.33 4829.64 4918.96 5008.28 540960.81 5097.59 540948.39 5186.91 0.00 0.00 0.00 0.00 0.00 4.00 4.00 0.00 0.00 0.00 13.12 MWD+IFR+MSi 12.63 MWD+IFR+MSi 0.00 MWD+IFR+MSi 0.00 MWD+IFR+MSI 0.00 MWD+IFR+MS I I 0.00 MWD+IFR+MSI 0.00 MWD+IFR+MS! 0.00 MWD+IFR+MS I 0.00 MWD+IFR+MS I 0.00 MWD+IFR+MS I 0.00 MWD+IFR+MS I 0.00 MWD+IFR+MSi 0.00 MWD+IFR+MS¡ 0.00 MWD+IFR+MSi 0.00 MWD+IFR+MS , 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 MWD+IFR+MSI 0.00 MWD+IFR+MSI 0.00 MWD+IFR+MSI 0.00 MWD+IFR+MS I 0.00 MWD+IFR+MSI 0.00 0.00 0.00 0.00 0.00 0.00 MWD+IFR+MS! 0.00 MWD+IFR+MSi 0.00 MWD+IFR+MS! 0.00 MWD+IFR+MSI 0.00 MWD+IFR+MSI 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 4.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 MWD+IFR+MS' 0.00 MWD+IFR+MSi 0.00 MWD+IFR+MS' 0.00 MWD+IFR+MS¡ 0.00 MWD+IFR+MS 0.00 TUZC 0.00 MWD+IFR+MS' 0.00 MWD+IFR+MS I 0.00 MWD+IFR+MS: 269.16 MWD+IFR+MS 180.00 MWD+IFR+MS: 180.00 MWD+IFR+MS, 180.00 MWD+IFR+MS 180.00 MWD+IFR+MSI 180.00 MWD+IFR+MSI 180.00 MWD+IFR+MSI 180.00 MWD+IFR+MS' 180.00 MWD+IFR+MS 180.00 MWD+IFR+MSI 180.00 MWD+IFR+MS 180.00 SBF2-NA 180.00 MWD+IFR+MSi 180.00 MWD+IFR+MSI 180.00 MWD+IFR+MS¡ 180.00 MWD+IFR+MSI 0.60 180.00 MWD+IFR+MS, 0.00 180.00 MWD+IFR+MS: e BP e KW A Planning Report Company: BP Amoco Date: 9/26/2003 Time: 06:48:56 Page: 4 Field: Milne Point Co-ordinate(NE) Reference: Well: Plan MPF-88, True North Site: M Pt F Pad Vertical (TVD) Reference: 45.20' 45.2 Well: Plan MPF-88 Section (VS) Reference: Well (0.00N.0.00E,355.12Azi) Plan MPF-88 Calculation Method: Minimum Curvature Db: Oracle Survey -.. _._-------"._----_._---~---_._---- ___________.._n._ ---------,---------------...--- - ._--~-------_._------------_.._._-_.._-------- -- -------.-----.,-.....-- -- ----_._----.--_.._~_._--------,.__._----~ MD Incl Azim TVD Sys TVD MapN MapE VS DLS TFO Tool ft deg deg ft ft ft ft ft deg/100ft deg - n.. _,_._.____~.________"_________...____________ --- -_..._---_._.,..._~_.__.._._._-_._--- .._... _. u_____.·.___..~ - ---.----'---- -----------.- _ ____.__.m._.~_.~~_._.__.___________.___ __ ___"'n_.' ._.__._.__.________ --- -......-.--.-- _ ·."____._n__'._.....,_.._..__. , 7300.00 63.41 352.34 4307.10 4261.90 6040820.83 540935.97 5276.23 0.00 180.00 MWD+IFR+MS; 7340.44 63.41 352.34 4325.20 4280.00 6040856.63 540930.95 5312.34 0.00 180.00 SBA5 ; 7400.00 63.41 352.34 4351.86 4306.66 6040909.37 540923.55 5365.54 0.00 180.00 MWD+IFR+MS 7500.00 63.41 352.34 4396.62 4351.42 6040997.92 540911.13 5454.86 0.00 180.00 MWD+IFR+MSi 7600.00 63.41 352.34 4441.39 4396.19 6041086.47 540898.71 5544.18 0.00 180.00 MWD+IFR+MSi 7700.00 63.41 352.34 4486.15 4440.95 6041175.01 540886.29 5633.49 0.00 180.00 MWD+IFR+MSI 7800.00 63.41 352.34 4530.91 4485.71 6041263.56 540873.87 5722.81 0.00 180.00 MWD+IFR+MS i 7900.00 63.41 352.34 4575.67 4530.47 6041352.11 540861.45 5812.13 0.00 180.00 MWD+IFR+MS: I 8000.00 63.41 352.34 4620.43 4575.23 6041440.66 540849.03 5901.44 0.00 180.00 MWD+IFR+MS i 8100.00 63.41 352.34 4665.19 4619.99 6041529.20 540836.61 5990.76 0.00 180.00 MWD+IFR+MS i 8200.00 63.41 352.34 4709.96 4664.76 6041617.75 540824.19 6080.08 0.00 180.00 MWD+IFR+MSI 8300.00 63.41 352.34 4754.72 4709.52 6041706.30 540811.77 6169.39 0.00 180.00 MWD+IFR+MSI 8400.00 63.41 352.34 4799.48 4754.28 6041794.84 540799.35 6258.71 0.00 180.00 MWD+IFR+MSi 8500.00 63.41 352.34 4844.24 4799.04 6041883.39 540786.93 6348.03 0.00 180.00 MWD+IFR+MS¡ 8600.00 63.41 352.34 4889.00 4843.80 6041971.94 540774.51 6437.34 0.00 180.00 MWD+IFR+MS, 8700.00 63.41 352.34 4933.77 4888.57 6042060.48 540762.09 6526.66 0.00 180.00 MWD+IFR+MS i 8802.60 63.41 352.34 4979.69 4934.49 6042151.33 540749.35 6618.30 0.00 180.00 MWD+IFR+MS I 8900.00 62.52 352.78 5023.96 4978.76 6042237.28 540737.63 6704.97 1.00 155.97 MWD+IFR+MS i I 9000.00 61.61 353.25 5070.81 5025.61 6042324.91 540726.40 6793.25 1.00 155.76 MWD+IFR+MS I 9100.00 60.70 353.73 5119.05 5073.85 6042411.87 540715.98 6880.81 1.00 155.54 MWD+IFR+MS; 9200.00 59.79 354.21 5168.68 5123.48 6042498.14 540706.37 6967.61 1.00 155.31 MWD+IFR+MS; 9300.00 58.89 354.70 5219.68 5174.48 6042583.70 540697.57 7053.62 1.00 155.07 MWD+IFR+MS! 9400.00 57.98 355.20 5272.03 5226.83 6042668.52 540689.60 7138.82 1.00 154.82 MWD+IFR+MS: 9500.00 57.08 355.71 5325.71 5280.51 6042752.57 540682.44 7223.19 1.00 154.56 MWD+IFR+MSI 9600.00 56.18 356.24 5380.71 5335.51 6042835.84 540676.11 7306.69 1.00 154.29 MWD+IFR+MSI 9700.00 55.28 356.77 5437.02 5391.82 6042918.28 540670.61 7389.31 1.00 154.00 MWD+IFR+MS 9800.00 54.39 357.31 5494.61 5449.41 6042999.89 540665.93 7471.01 1.00 153.70 MWD+IFR+MS! 9900.00 53.49 357.87 5553.48 5508.28 6043080.63 540662.08 7551.77 1.00 153.38 MWD+IFR+MS· 10000.00 52.60 358.44 5613.59 5568.39 6043160.48 540659.06 7631.57 1.00 153.06 MWD+IFR+MS I 10100.00 51.72 359.03 5674.93 5629.73 6043239.41 540656.87 7710.39 1.00 152.71 MWD+IFR+MS: 10200.00 50.83 359.62 5737.49 5692.29 6043317.41 540655.51 7788.19 1.00 152.36 MWD+IFR+MS j 10300.00 49.95 0.24 5801.24 5756.04 6043394.44 540654.99 7864.96 1.00 151.98 MWD+IFR+MS¡ 10400.00 49.07 0.87 5866.17 5820.97 6043470.48 540655.29 7940.68 1.00 151.59 MWD+IFR+MSi 10500.00 48.20 1.51 5932.26 5887.06 6043545.52 540656.43 8015.31 1.00 151.18 MWD+IFR+MS¡ 10600.00 47.33 2.18 5999.47 5954.27 6043619.52 540658.40 8088.84 1.00 150.75 MWD+IFR+MSi 10700.00 46.46 2.86 6067.81 6022.61 6043692.47 540661.19 8161.24 1.00 150.31 MWD+IFR+MS, 10800.00 45.60 3.57 6137.23 6092.03 6043764.34 540664.82 8232.49 1.00 149.84 MWD+IFR+MS i 10900.00 44.74 4.29 6207.73 6162.53 6043835.11 540669.28 8302.58 1.00 149.35 MWD+IFR+MS! 11000.00 43.89 5.04 6279.29 6234.09 6043904.77 540674.56 8371.47 1.00 148.84 MWD+IFR+MS 11100.00 43.04 5.81 6351.87 6306.67 6043973.27 540680.67 8439.15 1.00 148.31 MWD+IFR+MS 11200.00 42.20 6.60 6425.45 6380.25 6044040.62 540687.61 8505.60 1.00 147.75 MWD+IFR+MS 11300.00 41.36 7.42 6500.03 6454.83 6044106.78 540695.36 8570.79 1.00 147.16 MWD+IFR+MS 11400.00 40.53 8.27 6575.56 6530.36 6044171.74 540703.94 8634.72 1.00 146.55 MWD+IFR+MS 11500.00 39.70 9.15 6652.04 6606.84 6044235.48 540713.33 8697.35 1.00 145.91 MWD+IFR+MS 11600.00 38.89 10.05 6729.43 6684.23 6044297.98 540723.54 8758.66 1.00 145.24 MWD+IFR+MS 11700.00 38.07 11.00 6807.71 6762.51 6044359.21 540734.55 8818.65 1.00 144.54 MWD+IFR+MS 11791.62 37.34 11.89 6880.20 6835.00 6044414.19 540745.36 8872.43 1.00 143.80 KLGM 11800.00 37.27 11.97 6886.86 6841.66 6044419.16 540746.38 8877 .29 1.00 143.10 MWD+IFR+MS 11873.03 36.69 12.71 6945.20 6900.00 6044462.12 540755.52 8919.25 1.00 143.03 TKUD 11900.00 36.48 12.98 6966.86 6921.66 6044477.81 540759.01 8934.57 1.00 142.44 MWD+IFR+MS 12000.00 35.69 14.03 7047.67 7002.47 6044535.15 540772.43 8990.46 1'.00 142.22 MWD+IFR+MS 12042.42 35.36 14.49 7082.20 7037.00 6044559.07 540778.37 9013.74 1.00 141.37 TKUC 12052.23 35.28 14.60 7090.20 7045.00 6044564.57 540779.76 9019.09 1.00 141.00 TKUB e BP KW A Planning Report e __ .._.'. u__......._.. .---- '.-._----_._.'- Company: BP Amoco Date: 9/26/2003 Time: 06:48:56 Page: 5 Field: Milne Point Co-ordinate(NE) Reference: Well: Plan MPF-88, True North Site: M pt F Pad Vertical (fVD) Reference: 45.20' 45.2 Well: Plan MPF-88 Section (VS) Reference: Well (0.00N,0.00E,355.12Azi) Wellpath: Plan MPF-88 Survey Calculation Method: Minimum Curvature Db: Oracle -_.--.._---'".,._-~- --_._-_._----_._._-~-_._~ _ "___m________ _'m'___'_ .--'-.-----....-.-.-...- - ---------- ...----......-.- ... O___"P_______.___.,. ,'._____""... "'.____ Survey ---------------._- --- .--..----------- ------------..---.------.-.--- --------------- ------------~ MD Inel Azim TVD Sys TVD MapN MapE VS DLS TFO ft deg deg ft ft ft ft ft deg/100ft deg 12086.47 35.02 14.97 7118.20 7073.00 6044583.66 540784.69 9037.66 1.00 140.91 TKUA 12088.91 35.00 15.00 7120.20 7075.00 6044585.01 540785.04 9038.98 1.00 140.60 MPF-88 T1 12091.36 35.00 15.00 7122.20 7077.00 6044586.37 540785.40 9040.29 0.00 0.00 TKA3 12100.00 35.00 15.00 7129.28 7084.08 6044591.16 540786.65 9044.96 0.00 0.00 MWD+IFR+MS 12109.67 35.00 15.00 7137.20 7092.00 6044596.53 540788.06 9050.17 0.00 0.00 TKA2 12136.52 35.00 15.00 7159.20 7114.00 6044611.43 540791.96 9064.66 0.00 0.00 TKA1 12207.33 35.00 15.00 7217.20 7172.00 6044650.71 540802.25 9102.85 0.00 0.00 TMLV 12300.00 35.00 15.00 7293.11 7247.91 6044702.12 540815.72 9152.84 0.00 0.00 MWD+IFR+MS 12357.33 35.00 15.00 7340.07 7294.87 6044733.93 540824.05 9183.76 0.00 0.00 MWD+IFR+MS I .I II I 2,000 1,500 I / / I . ./ /t / ¡ I ¡ .¡ I ¡ /~ j ~J9. / .I ~JQQ /;]10 ~ - ¡ ./ z / , / /./ ~-~......._...._........__......._.-..__...._. / , //~o ! / ì"" Q /. 1,000 500 I o Feel ¡ i L:;-- ¡ ,.I..Y:)() f 6000 6500 MPU F-53 \0000 \ \ \ \ \'Y-...aa \ I 'r..' ~u \37 \ \\à~\ \ \ _ \\,. \S()~J '\ \\ \~. (j \ \ ~ \. -D'0 '\ N \ \f( \\ ,J \ \ \ \ \ \ 1 \. "\\ \ \, \ \ \\ \ \. . , \. \\:...cf~ \ \ \ \\\ \ I '\r&)'iJ \\ \ 4500 \ 5000 J,5DD =t:1p I~ w ;~ 'I I ~ /66C\) / / /tJOoo ~~F-70 I I 5500 .... fFfJÇJ \~ \ \ \ \ \ \SCJÇJ \ \. \ \ 650 MPU F-881 (Proposed) 700 !"",_L".,I."." " ','.m,."",. """",."".""" 1"f'::1"f'U ur·...". . '5500 I"", p055163 DATE 10/6/2003 CHECK NO. 055163 DATE INVOICE I CREDIT MEMO DESCRIPTION GROSS VENDOR DISCOUNT NET 10/6/2003 INV# PR100103C PERMIT TO DRill EE H e V'Y{f)f-B5=t. THE ATTACHED CHECK IS IN PAYMENT FOR ITEMS DESCRIBED ABOVE. TOTAL ~ BP EXPLORATION, (ALASKA) INC. PRUDHOE BAY UNIT PO BOX 196612 AK 99519-6612 NATIONAL CITY BANK Ashland, Ohio 56-389 412 No. P 0 5 516 3 CONSOLIDATED COMMERCIAL ACCOUNT PAY: 8.p.~~~r ~, e TO THE ORDER OF: .' .... ALASKA Oil & GAS CONSERVATION COMMISSION 333 W 7TH AVENUE SUITE 100 ANCHORAGE, AK 99501-3539 DATE October 6, 2003 ***t"~*$1 00.00******* AMOUNT NOTt;7S;'~:1f?1ZFs:;¡t:;'!i-;Z:'~:': I· '.: .j.~~!:,~. ......~..~.~....~.~........... t":.'?¥!f.:ZfJ.~~~4:~~i:;~:ttl* . "," '," ',', .:\ -, :':.......,. '. ~'":".' :\.. :". .:'.. :....- :\. 1110 5 5 i b 3t III !: 0 I..¡ i 20 3t B 11 5 I: 0 i 2 ? B ~ b III e e TRANSMIT AL LETTER CHECKLIST CIRCLE APPROPRIATE LETTERIP ARA GRAPH S TO BE INCLUDED IN TRANSMITTAL LETTER WELL NAME /,?PU ,c-: 2?&'{. PTD# 2D3'" /93 CHECK WHAT ADD-ONS "CLUE" APPLIES (OPTIONS) MULTI Tbe permit is for a new weJlbore segment of LATERAL existing well-, Permit No, API No. . (If API num ber Productionsbould continue to be reported as last two (2) digits a function' of tbe original API number. stated are between 60-69) above. PILOT HOLE In accordance with 20 AAC 25.005(1), all (PH) records, data and logs acquired for tbe pilot bole must be clearly differentiated in both name (name on permit plus PH) . and API number (50 - 70/80) from records, data and logs acquired for wen (name on permit). SPACING Tbe permit is approved subject to full EXCEPTION . compliance with 20 AAC 25.055. Approval to perforate and produce is contingent upon issuance of a conservation order approving a spacing exception. (Company Name) assumes tbe liability of any protest to tbe spacing . exception tbat may occur. DRY DITCH All dry ditcb sample sets submitted to tbe SAMPLE Commission must be in no greater than 30' sample intervals from below tbe permafrost or from wbere samples are first caught and 10' sample intervals tbrough target zones. Rev: 07110/02 C\jody\templates WELL PE~MtT C~.ECKLlST Field & Pool MILNE POINT, KUPARUK RIVER OIL - 525100 PTD#:2031930 Company BP EXPLORATION (ALASKA) INC Initial ClasslType Administration 1 P~m1)itfee attaches:!. .Y~s 2 .Leas~n!Jmber .appropriate. Yes . Correçted:. Surface i$ inAOL.25509~ top -pros:!l,Ictive int <lnd 10 are [nAQL3p5018. 3 .U.niq!Je weltllarn~.a[1d oumb.er Yes. _ _ 4 WenJocat~d in.adefines:!-pool .Y~s . 5 WellJocat~d proper .distance. from driJling unitb.oundalY. .Y~s 6 WeJlJocat~d proper .distancefrom otheJ welJs. .Y~s . 7 .Sufficient acrea9-eavailable indJilIi09-unii. .Y~s 8 Jfd~viated, is. weJlbore plaUncluded .Y~s 90-perator onlyo affected party. .Y~s 10 .O-perator has.appropriate.Qond ÎJlJorce .Y~$ . 11 P~rmit can be iS$ueçl without con$erva.tion order. Yes Appr Date 12 P~rmit can be iS$ueçl without administratille.approvaJ .Y~s ~ 11/20/2003 13 Can permit be approved before 15-day wait Yes ., 14 WellJocat~d within area alld.strata .authorized by.lnjectioo Ord~r # (P!JtlO# incornrneot$).(For. .Y~s I'IIOllewithin th.eXuparuk œservoir. 15 .AII welJs. within J !4.mile .area. oj review id~otified (For ~ervjc~ well onlyo). . .Y.e$ . . . . _ ... . . . _ . . . _ _ _ 16 Pre-produçed injector; s:!uration. oj pre-pros:!uctionl~ss tn,m 3 months (For service well only) . ~ Nll-þ II '2.0/.0'] 17 ACMPJ'indingof Con.sistency h.as bee.n .i~s!Jed.for.this project NA Engineering 18 19 20 21 22 23 24 25 26 27 Appr Date 28 , 11/24/2003 29 1rVt 30 31 32 33 34 35 36 Date 37 11/20/2003 38 39 Geology Appr SFD Geologic Commissioner: 0]< .Conductor stringpJovided Yes .S.urface .c<l~ingpJotect!i alLknowll USOWs NA .CMT v.ol adeQuate.to circulate.o.n .conductor: & SUJf.C$g .Y~s CMT v.ol adeQuate.to tie-in Jong string to surf csg. N.o .CMTwill covera]l knownprQductive horizon.s. Yes .C.asing desi~ns adeç¡uate for C,.T~ B& permafrost .Y~s As:!equateJankage.oJ re.serve pit Yes. Jf.aJe-s:!riIL has.a 10-403 Jor abançlOllme.nt be~n apPJovedNA As:!equatewellbore ~epélr¡;¡tio.n.propo~es:!. _ .Y~s . _ . ¡:>rOJ5imityo analysis performed, Clo$e approache.s.(2) .identifi.ed.. Oire_ctionaLmitigation.mea.sl,lres élllailabje~ Jf.divecter required, doe$ it meet reguJations. Yes. .DJilliog fJuidpro9-ram schematic & equipJistadequ<lte. .Y~s BOPEs,.do .they meet reguJation .Y~s .B0PEpress rating appropriate; .test to (pu.t psig in .comments) Yes. .C.hokemanjfold compJies w/APLRF'-53 (May 64) .Y~s Work will occur withoutoperation .shutdown. .Y~s J!i pre!ience of H2S gas. prob.able . No Meçha.nic<lLcood.itio[1 of wells within ,6,OR verified (Forservjce welJ onJyo). . . . .Y~s . . . . . P~rmit can be issueçl wlo hydrogen sulfide meas.ure$ . .D.ata.presented Oil pote.ntial oveJPre!is!Jœ .zone$. .S~isr:nican..lysjs. of $haJlow gas zones. .Seabed .conditioo survey (if off-~hore) . CQnta.ct name!pnOlleJorweekly progre~sreports [exploratory .only] N.o .Y~s NA NA NA Date: Engineering Commissioner: PUb:~~O~ commis~ " Date Date I z¡ 0/0 Well Name: MILNE PT UNIT KR F-88 SER I PEND GeoArea 890 o o Program SER On/Off Shore On Well bore seg Annular Disposal Unit 11328 - 1'1I0 other Kuparuk wens within 1000' .(f-33A i$aS.ag River. weJl1. · Ooly Kuparukwell with.in SW!40J 30-14N.-10W - . . · ,6,Laç l,Iifers.exempted 40 CF:R 147--102 (b)(3). Rig is. e.quippedwith $teeLpjts.. No œse.rve.pjtplanoed. All w¡;¡~te to.Clas$ Ilwell(st · Expected BHf> 5.6 EMW. . f>lanMd mud weigh.t!i 9.0 - 9.2 ppg. · CalcuJa.tedMASP 1426 p~i. PI<lI:med .BOPJes.t pressure. 3.500 psJ.. · tl2S hasbeenJeported 00 f pad.. Mu.d.shouJd preclude H2$00 th~ Jig.. Rig.is equipped with .sensors .and al¡;¡rms. Reviews:! records for MPF~33 .and MPf-53, .no cementiog prOQlems identified, · MPU f-F'ad welJs.h.ave produced H2S in excess of.20.ppm. Expected reservoir -pre.sSUJe i$ .5,8ppg (u.nderpressuredl. . .. e tit Well History File APPENDIX Information of detailed nature that is not particularly germane to the Well Permitting Process but is part of the history file. To improve the readability of the Well History file and to simplìfy fìnding information, information of this lature is accumulated at the end of the fìle under APPENDIX. No special effort has been made to chronologically organize this category of information. Sperry-Sun Dr~ng Services LIS sca~ility . ;~u3 -'19:3 $Revision: 3 $ LisLib $Revision: 4 $ Wed Feb 11 13:43:06 2004 p. ti\ V Reel Header Service name............ .LISTPE Date. . . . . . . . . . . . . . . . . . . . .04/02/11 Origin. . . . . . . . . . . . . . . . . . . STS Reel Name............ ....UNKNOWN Continuation Number.. ... .01 Previous Reel Name...... . UNKNOWN Comments................ .STS LIS Writing Library. Scientific Technical Services Tape Header Service name............ .LISTPE Date. . . . . . . . . . . . . . . . . . . . .04/02/11 Origin. . . . . . . . . . . . . . . . . . . STS Tape Name.............. ..UNKNOWN Continuation Number..... .01 Previous Tape Name..... ..UNKNOWN Comments................ .STS LIS Writing Library. Scientific Technical Services Physical EOF Comment Record TAPE HEADER Milne Point Unit MWD/MAD LOGS # WELL NAME: API NUMBER: OPERATOR: LOGGING COMPANY: TAPE CREATION DATE: # JOB DATA MPF-88 500292318500 B.P. Exploration (Alaska) Inc. Sperry-Sun Drilling Services 11-FEB-04 JOB NUMBER: LOGGING ENGINEER: OPERATOR WITNESS: MWD RUN 1 MW0002816602 T. MCGUIRE E. VAUGHN MWD RUN 2 MW0002816602 T. MCGUIRE E. VAUGHN MWD RUN 3 MW0002816602 T. MCGUIRE E. VAUGHN JOB NUMBER: LOGGING ENGINEER: OPERATOR WITNESS: MWD RUN 4 MW0002816602 T. MCGUIRE E. VAUGHN MWD RUN 5 MW0002816602 J. STRAHAN C. DIXON # SURFACE LOCATION SECTION: TOWNSHIP: RANGE: FNL: FSL: FEL: FWL: ELEVATION (FT FROM MSL 0) KELLY BUSHING: DERRICK FLOOR: GROUND LEVEL: 6 13N 10E RECEIVED ¡- 1 i' 1\;,\,,,,,1 . __.,~j i / L~V J4 2138 2906 i"'\ía~kl1 Oil & Gas Cons. Comm~n Anr;norage 45.42 11. 40 # WELL CASING RECORD OPEN HOLE CASING DRILLERS ~~~\\\~ 1ST STRING 2ND STRING 3RD STRING PRODUCTION STRING BIT S. (IN) 12.250 8.500 6.125 SIZE (IN) 20.000 9.625 7.000 DEPTH (FT) 122.0 7858.0 11928.0 . # REMARKS: 1. ALL DEPTHS ARE MEASURED DEPTH (MD) UNLESS OTHERWISE NOTED. 2. ALL VERTICAL DEPTHS ARE TRUE VERTICAL DEPTH (TVD). 3. MWD RUNS 1 & 2 COMPRISED DIRECTIONAL WITH DUAL GAMMA RAY (DGR) UTILIZING GEIGER-MUELLER TUBE DETECTORS. 4. MWD RUNS 3 - 5 COMPRISED DIRECTIONAL WITH DGR AND ELECTROMAGNETIC WAVE RESISTIVITY PHASE-4 (EWR4). MWD RUNS 3 & 4 ALSO INCLUDED PRESSURE WHILE DRILLING (PWD). RUN 3 ADDITIONALLY INCLUDED ACOUSTIC CALIPER (ACAL). 5. DEPTH SHIFTING/CORRECTION OF MWD DATA WAS WAIVED PER E-MAIL FROM K. COONEY (SIS/BP), DATED 2/9/04, QUOTING AUTHORIZATION FROM MIKIE SMITH (BP GEOLOGIST). MWD DATA ARE CONSIDERED PDC. 6. MWD RUNS 1 - 5 REPRESENT WELL MPF-88 WITH API#: 50-029-23185-00. THIS WELL REACHED A TOTAL DEPTH (TD) OF 12310'MD/7332'TVD. SROP SMOOTHED RATE OF PENETRATION WHILE DRILLING. SGRC SMOOTHED GAMMA RAY COMBINED. SEXP SMOOTHED PHASE SHIFT-DERIVED SHALLOW SPACING) . SESP = SMOOTHED PHASE SHIFT-DERIVED SPACING) . SEMP = SMOOTHED PHASE SHIFT-DERIVED SPACING) . SEDP = SMOOTHED PHASE SHIFT-DERIVED SPACING) . SFXE = SMOOTHED FORMATION EXPOSURE TIME. SLIDE = NON-ROTATED INTERVALS $ RESISTIVITY (EXTRA RESISTIVITY ( SHALLOW RESISTIVITY (MEDIUM RESISTIVITY (DEEP File Header Service name............ .STSLIB.001 Service Sub Level Name... Version Number.......... .1.0.0 Date of Generation...... .04/02/11 Maximum Physical Record. .65535 File Type. .............. .LO Previous File Name...... .STSLIB.OOO Comment Record FILE HEADER FILE NUMBER: EDITED MERGED MWD Depth shifted DEPTH INCREMENT: # FILE SUMMARY PBU TOOL CODE GR 1 and clipped curves¡ all bit runs merged. .5000 START DEPTH 66.0 STOP DEPTH 12261. 5 ROP 112.. 12310.0 . FET 7845.0 12268.5 RPD 7845.0 12268.5 RPM 7845.0 12268.5 RPS 7845.0 12268.5 RPX 7845.0 12268.5 $ # BASELINE CURVE FOR SHIFTS: CURVE SHIFT DATA (MEASURED DEPTH) --------- EQUIVALENT UNSHIFTED DEPTH --------- BASELINE DEPTH $ # MERGED DATA SOURCE PBU TOOL CODE MWD MWD MWD MWD MWD $ BIT RUN NO 1 2 3 4 5 MERGE TOP 66.0 4566.5 7870.0 11403.0 11936.0 MERGE BASE 4566.5 7870.0 11403.0 11936.0 12310.0 # REMARKS: MERGED MAIN PASS. $ # Data Format Specification Record Data Record Type..................O Data Specification Block Type.....O Logging Direction.......... ...... . Down Optical log depth units.... ...... .Feet Data Reference Point.... ....... ...Undefined Frame Spacing............ ........ .60 .1IN Max frames per record............ .Undefined Absent value.............. .... ....-999 Depth Units. . . . . . . . . . . . . . . . . . . . . . . Datum Specification Block sub-type...O Name Service Order Units Size Nsam Rep Code Offset Channel DEPT FT 4 1 68 0 1 ROP MWD FT/H 4 1 68 4 2 GR MWD API 4 1 68 8 3 RPX MWD OHMM 4 1 68 12 4 RPS MWD OHMM 4 1 68 16 5 RPM MWD OHMM 4 1 68 20 6 RPD MWD OHMM 4 1 68 24 7 FET MWD HOUR 4 1 68 28 8 First Last Name Service Unit Min Max Mean Nsam Reading Reading DEPT FT 66 12310 6188 24489 66 12310 ROP MWD FT/H 0.45 3416.04 254.336 24397 112 12310 GR MWD API 18.28 164.01 83.7461 24392 66 12261.5 RPX MWD OHMM 0.91 657.37 3.2689 8848 7845 12268.5 RPS MWD OHMM 0.71 2000 4.26887 8848 7845 12268.5 RPM MWD OHMM 0.54 2000 14.0341 8848 7845 12268.5 RPD MWD OHMM 0.68 2000 17.7475 8848 7845 12268.5 FET MWD HOUR 0.0986 79.6092 1.75543 8848 7845 12268.5 First Reading For Entire File......... .66 Last Reading For Entire File.......... .12310 File Trailer Service name.. ....... ....STSLIB.001 Service Sub Level Name..~ Version Number......... .~0.0 Date of Generation...... .04/02/11 Maximum Physical Record..65535 File Type.............. ..LO Next File Name.......... .STSLIB.002 Physical EOF File Header Service name........... ..STSLIB.002 Service Sub Level Name... Version Number.... ...... .1.0.0 Date of Generation...... .04/02/11 Maximum Physical Record. .65535 File Type...... . . . . . . . . . . LO Previous File Name...... .STSLIB.001 Comment Record FILE HEADER FILE NUMBER: RAW MWD Curves and log BIT RUN NUMBER: DEPTH INCREMENT: # FILE SUMMARY VENDOR TOOL CODE GR ROP $ 2 . header data for each bit run in separate files. 1 .5000 START DEPTH 66.0 112.0 STOP DEPTH 4520.0 4566.5 # LOG HEADER DATA DATE LOGGED: SOFTWARE SURFACE SOFTWARE VERSION: DOWNHOLE SOFTWARE VERSION: DATA TYPE (MEMORY OR REAL-TIME) : TD DRILLER (FT): TOP LOG INTERVAL (FT): BOTTOM LOG INTERVAL (FT): BIT ROTATING SPEED (RPM): HOLE INCLINATION (DEG MINIMUM ANGLE: MAXIMUM ANGLE: # TOOL STRING (TOP TO VENDOR TOOL CODE DGR $ BOTTOM) TOOL TYPE DUAL GAMMA RAY # BOREHOLE AND CASING DATA OPEN HOLE BIT SIZE (IN): DRILLER'S CASING DEPTH (FT): # BOREHOLE CONDITIONS MUD TYPE: MUD DENSITY (LB/G): MUD VISCOSITY (S): MUD PH: MUD CHLORIDES (PPM): FLUID LOSS (C3): RESISTIVITY (OHMM) AT TEMPERATURE (DEGF) MUD AT MEASURED TEMPERATURE (MT): MUD AT MAX CIRCULATING TERMPERATURE: MUD FILTRATE AT MT: 22-DEC-03 Insite 66.37 Memory 4566.0 65.0 4566.0 .2 64.7 TOOL NUMBER 61497 12.250 .0 SPUD Mud 9.30 95.0 8.5 800 8.8 .000 .000 .000 .0 60.8 .0 MUD CAKE AT MT: . .000 . # NEUTRON TOOL MATRIX: MATRIX DENSITY: HOLE CORRECTION (IN): # TOOL STANDOFF (IN): EWR FREQUENCY (HZ): # REMARKS: $ # Data Format Specification Record Data Record Type........... .......0 Data Specification Block Type.....O Logging Direction................ . Down Optical log depth units.......... .Feet Data Reference Point............. .Undefined Frame Spacing....... ........... ...60 .1IN Max frames per record............ .Undefined Absent value. .................... .-999 Depth Units. . . . . . . . . . . . . . . . . . . . . . . Datum Specification Block sub-type...O Name Service Order DEPT ROP MWD010 GR MWD010 Units FT FT/H API Size 4 4 4 Nsam 1 1 1 Code Offset o 4 8 Channel 1 2 3 Rep 68 68 68 First Last Name Service Unit Min Max Mean Nsam Reading Reading DEPT FT 66 4566.5 2316.25 9002 66 4566.5 ROP MWD010 FT/H 0.45 3416.04 331.022 8910 112 4566.5 GR MWD010 API 18.28 136.07 66.3733 8909 66 4520 First Reading For Entire File... ...... .66 Last Reading For Entire File.......... .4566.5 File Trailer Service name............ .STSLIB.002 Service Sub Level Name... Version Number.......... .1.0.0 Date of Generation..... ..04/02/11 Maximum Physical Record. .65535 File Type............... .LO Next File Name.......... .STSLIB.003 Physical EOF File Header Service name............ .STSLIB.003 Service Sub Level Name... Version Number.......... .1.0.0 Date of Generation...... .04/02/11 Maximum Physical Record. .65535 File Type................ LO Previous File Name.. .....STSLIB.002 Comment Record FILE HEADER FILE NUMBER: 3 · header data for 2 .5000 each bit run in separate f~. RAW MWD Curves and log BIT RUN NUMBER: DEPTH INCREMENT: # FILE SUMMARY VENDOR TOOL CODE GR ROP $ START DEPTH 4520.5 4567.0 STOP DEPTH 7823.5 7870.0 # LOG HEADER DATA DATE LOGGED: SOFTWARE SURFACE SOFTWARE VERSION: DOWNHOLE SOFTWARE VERSION: DATA TYPE (MEMORY OR REAL-TIME) : TD DRILLER (FT): TOP LOG INTERVAL (FT): BOTTOM LOG INTERVAL (FT): BIT ROTATING SPEED (RPM): HOLE INCLINATION (DEG MINIMUM ANGLE: MAXIMUM ANGLE: # TOOL STRING (TOP TO VENDOR TOOL CODE DGR $ BOTTOM) TOOL TYPE DUAL GAMMA RAY # BOREHOLE AND CASING DATA OPEN HOLE BIT SIZE (IN): DRILLER'S CASING DEPTH (FT): # BOREHOLE CONDITIONS MUD TYPE: MUD DENSITY (LB/G): MUD VISCOSITY (S): MUD PH: MUD CHLORIDES (PPM): FLUID LOSS (C3): RESISTIVITY (OHMM) AT TEMPERATURE (DEGF) MUD AT MEASURED TEMPERATURE (MT): MUD AT MAX CIRCULATING TERMPERATURE: MUD FILTRATE AT MT: MUD CAKE AT MT: # NEUTRON TOOL MATRIX: MATRIX DENSITY: HOLE CORRECTION (IN): # TOOL STANDOFF (IN): EWR FREQUENCY (HZ): # REMARKS: $ # Data Format Specification Record Data Record Type..................O Data Specification Block Type.....O Logging Direction...... ... ....... . Down Optical log depth units....... ... .Feet Data Reference Point............. . Undefined Frame Spacing.................... .60 .1IN Max frames per record...... ...... . Undefined Absent value.............. .... ... .-999 Depth Units. . . . . . . . . . . . . . . . . . . . . . . 23-DEC-03 Insite 66.37 Memory 7870.0 4566.0 7870.0 61.0 65.4 TOOL NUMBER 61497 12.250 .0 SPUD mud 9.25 63.0 8.0 400 8.2 .000 .000 .000 .000 .0 87.8 .0 .0 Datum Specification Bloc4llbb-type...0 . Name Service Order Units Size Nsam Rep Code Offset Channel DEPT FT 4 1 68 0 1 ROP MWD020 FT/H 4 1 68 4 2 GR MWD020 API 4 1 68 8 3 First Last Name Service Unit Min Max Mean Nsam Reading Reading DEPT FT 4520.5 7870 6195.25 6700 4520.5 7870 ROP MWD020 FT/H 5.55 730.64 239.463 6607 4567 7870 GR MWD020 API 25 128.02 76.4454 6607 4520.5 7823.5 First Reading For Entire File......... .4520.5 Last Reading For Entire File. ......... .7870 File Trailer Service name.. .......... .STSLIB.003 Service Sub Level Name... Version Number.......... .1.0.0 Date of Generation...... .04/02/11 Maximum Physical Record. .65535 File Type............... .LO Next File Name.......... .STSLIB.004 Physical EOF File Header Service name............ .STSLIB.004 Service Sub Level Name... Version Number.......... .1.0.0 Date of Generation...... .04/02/11 Maximum Physical Record. .65535 File Type............... .LO Previous File Name...... .STSLIB.003 Comment Record FILE HEADER FILE NUMBER: RAW MWD Curves and log BIT RUN NUMBER: DEPTH INCREMENT: # FILE SUMMARY VENDOR TOOL CODE GR RPS FET RPD RPX RPM ROP $ 4 header data for each bit run in separate files. 3 .5000 START DEPTH 7824.0 7845.0 7845.0 7845.0 7845.0 7845.0 7870.5 STOP DEPTH 11353.0 11363.0 11363.0 11363.0 11363.0 11363.0 11403.0 # LOG HEADER DATA DATE LOGGED: SOFTWARE SURFACE SOFTWARE VERSION: DOWNHOLE SOFTWARE VERSION: DATA TYPE (MEMORY OR REAL-TIME) : TD DRILLER (FT): 27-DEC-03 Insite 66.37 Memory 11403.0 TOP LOG INTERVAL (FT): 4IÞ BOTTOM LOG INTERVAL (FT): BIT ROTATING SPEED (RPM): HOLE INCLINATION (DEG MINIMUM ANGLE: MAXIMUM ANGLE: # TOOL STRING (TOP TO VENDOR TOOL CODE DGR EWR4 $ BOTTOM) TOOL TYPE DUAL GAMMA RAY ELECTROMAG. RESIS. 4 # BOREHOLE AND CASING DATA OPEN HOLE BIT SIZE (IN): DRILLER'S CASING DEPTH (FT): # BOREHOLE CONDITIONS MUD TYPE: MUD DENSITY (LB/G): MUD VISCOSITY (S): MUD PH: MUD CHLORIDES (PPM): FLUID LOSS (C3): RESISTIVITY (OHMM) AT TEMPERATURE (DEGF) MUD AT MEASURED TEMPERATURE (MT): MUD AT MAX CIRCULATING TERMPERATURE: MUD FILTRATE AT MT: MUD CAKE AT MT: # NEUTRON TOOL MATRIX: MATRIX DENSITY: HOLE CORRECTION (IN): # TOOL STANDOFF (IN): EWR FREQUENCY (HZ): # REMARKS: $ # Data Format Specification Record Data Record Type..................O Data Specification Block Type.....O Logging Direction............... ..Down Optical log depth units.... ..... ..Feet Data Reference Point.. ........... . Undefined Frame Spacing.................... .60 .1IN Max frames per record............ . Undefined Absent value.. ................... .-999 Depth Units. . . . . . . . . . . . . . . . . . . . . . . Datum Specification Block sub-type...O 7870.0 11403.0 42.2 64.2 TOOL NUMBER 155789 145654 8.500 7858.0 LSND 9.30 49.0 9.0 500 6.0 2.000 .990 4.000 2.200 Name Service Order Units Size Nsam Rep Code Offset Channel DEPT FT 4 1 68 0 1 ROP MWD030 FT/H 4 1 68 4 2 GR MWD030 API 4 1 68 8 3 RPX MWD030 OHMM 4 1 68 12 4 RPS MWD030 OHMM 4 1 68 16 5 RPM MWD030 OHMM 4 1 68 20 6 RPD MWD030 OHMM 4 1 68 24 7 FET MWD030 HOUR 4 1 68 28 8 Name Service Unit DEPT FT Min 7824 Max 11403 Mean Nsam 9613.5 7159 4IÞ 65.0 138.2 65.0 65.0 First Reading 7824 Last Reading 11403 ROP MWD030 FT/H 4.8. 1849.21 208.327 7066 .870.5 11403 GR MWD030 API 49.54 140.69 104.384 7059 7824 11353 RPX MWD030 OHMM 0.91 18.35 2.75759 7037 7845 11363 RPS MWD030 OHMM 0.71 2000 3.6561 7037 7845 11363 RPM MWD030 OHMM 0.54 2000 4.40579 7037 7845 11363 RPD MWD030 OHMM 0.68 2000 8.53025 7037 7845 11363 FET MWD030 HOUR 0.0986 68.308 0.890415 7037 7845 11363 First Reading For Entire File......... .7824 Last Reading For Entire File.......... .11403 File Trailer Service name....... ......STSLIB.004 Service Sub Level Name... Version Number. ......... .1.0.0 Date of Generation...... .04/02/11 Maximum Physical Record..65535 File Type.......... .... ..LO Next File Name.... ...... .STSLIB.005 Physical EOF File Header Service name........ ... ..STSLIB.005 Service Sub Level Name... Version Number...... .... .1.0.0 Date of Generation...... .04/02/11 Maximum Physical Record. .65535 File Type.............. ..LO Previous File Name..... ..STSLIB.004 Comment Record FILE HEADER FILE NUMBER: RAW MWD Curves and log BIT RUN NUMBER: DEPTH INCREMENT: # FILE SUMMARY VENDOR TOOL CODE GR RPX RPS RPM FET RPD ROP $ 5 header data for each bit run in separate files. 4 .5000 START DEPTH 11353.5 11363.5 11363.5 11363.5 11363.5 11363.5 11403.5 STOP DEPTH 11886.0 11896.0 11896.0 11896.0 11896.0 11896.0 11936.0 # LOG HEADER DATA DATE LOGGED: SOFTWARE SURFACE SOFTWARE VERSION: DOWNHOLE SOFTWARE VERSION: DATA TYPE (MEMORY OR REAL-TIME) : TD DRILLER (FT): TOP LOG INTERVAL (FT): BOTTOM LOG INTERVAL (FT): BIT ROTATING SPEED (RPM): HOLE INCLINATION (DEG MINIMUM ANGLE: MAXIMUM ANGLE: 28-DEC-03 Insite 66.37 Memory 11936.0 11403.0 11936.0 37.0 38.8 # TOOL STRING (TOP TO VENDOR TOOL CODE DGR EWR4 $ BOTTA TOO~YPE DUAL GAMMA RAY ELECTROMAG. RESIS. 4 # BOREHOLE AND CASING DATA OPEN HOLE BIT SIZE (IN): DRILLER'S CASING DEPTH (FT): # BOREHOLE CONDITIONS MUD TYPE: MUD DENSITY (LB/G): MUD VISCOSITY (S): MUD PH: MUD CHLORIDES (PPM): FLUID LOSS (C3): RESISTIVITY (OHMM) AT TEMPERATURE (DEGF) MUD AT MEASURED TEMPERATURE (MT): MUD AT MAX CIRCULATING TERMPERATURE: MUD FILTRATE AT MT: MUD CAKE AT MT: # NEUTRON TOOL MATRIX: MATRIX DENSITY: HOLE CORRECTION (IN): # TOOL STANDOFF (IN): EWR FREQUENCY (HZ): # REMARKS: $ # Data Format Specification Record Data Record Type........ ..........0 Data Specification Block Type.....O Logging Direction. . . . . . . . . . . . . . . . . Down Optical log depth units. . . . . . . . . . .Feet Data Reference Point.. ........... . Undefined Frame Spacing.............. ..... ..60 .1IN Max frames per record............ . Undefined Absent value....... .............. .-999 Depth Units. . . . . . . . . . . . . . . . . . . . . . . Datum Specification Block sub-type...O TOOL NUMBER. 155789 145654 8.500 7858.0 LSND 9.60 48.0 9.0 600 4.9 3.000 1. 420 4.500 2.400 60.0 134.2 60.0 60.0 Name Service Order Units Size Nsam Rep Code Offset Channel DEPT FT 4 1 68 0 1 ROP MWD040 FT/H 4 1 68 4 2 GR MWD040 API 4 1 68 8 3 RPX MWD040 OHMM 4 1 68 12 4 RPS MWD040 OHMM 4 1 68 16 5 RPM MWD040 OHMM 4 1 68 20 6 RPD MWD040 OHMM 4 1 68 24 7 FET MWD040 HOUR 4 1 68 28 8 First Last Name Service Unit Min Max Mean Nsam Reading Reading DEPT FT 11353.5 11936 11644.8 1166 11353.5 11936 ROP MWD040 FT/H 7.46 1135.22 160.779 1066 11403.5 11936 GR MWD040 API 69.62 164.01 123.436 1066 11353.5 11886 RPX MWD040 OHMM 1.59 8.3 2.97265 1066 11363.5 11896 RPS MWD040 OHMM 1. 57 6.58 2.92735 1066 11363.5 11896 RPM MWD040 OHMM 1. 57 6.17 2.94088 1066 11363.5 11896 RPD MWD040 OHMM 1. 53 5.07 3.02692 1066 11363.5 11896 FET MWD040 HOUR 0.1987 18.5512 1.8681 1066 11363.5 11896 . . First Reading For Entire File......... .11353.5 Last Reading For Entire File.......... .11936 File Trailer Service name............ .STSLIB.005 Service Sub Level Name... Version Number. ......... .1.0.0 Date of Generation...... .04/02/11 Maximum Physical Record. .65535 File Type........ ....... .LO Next File Name.. ........ .STSLIB.006 Physical EOF File Header Service name.......... ...STSLIB.006 Service Sub Level Name. . . Version Number. ......... .1.0.0 Date of Generation...... .04/02/11 Maximum Physical Record. .65535 File Type.. ............. .LO Previous File Name...... .STSLIB.005 Comment Record FILE HEADER FILE NUMBER: RAW MWD Curves and log BIT RUN NUMBER: DEPTH INCREMENT: # FILE SUMMARY VENDOR TOOL CODE GR RPD RPM RPS RPX FET ROP $ 6 header data for each bit run in separate files. 5 .5000 START DEPTH 11886.5 11888.5 11896.5 11896.5 11896.5 11896.5 11936.5 STOP DEPTH 12261.5 12268.5 12268.5 12268.5 12268.5 12268.5 12310.0 # LOG HEADER DATA DATE LOGGED: SOFTWARE SURFACE SOFTWARE VERSION: DOWNHOLE SOFTWARE VERSION: DATA TYPE (MEMORY OR REAL-TIME) : TD DRILLER (FT): TOP LOG INTERVAL (FT): BOTTOM LOG INTERVAL (FT): BIT ROTATING SPEED (RPM): HOLE INCLINATION (DEG MINIMUM ANGLE: MAXIMUM ANGLE: 01-JAN-04 Insite 66.37 Memory 12310.0 11936.0 12310.0 33.5 36.4 # TOOL STRING (TOP TO VENDOR TOOL CODE DGR EWR4 $ BOTTOM) TOOL TYPE DUAL GAMMA RAY Electromag Resis. 4 TOOL NUMBER 87225 167218 # BOREHOLE AND CASING DATA OPEN HOLE BIT SIZE (IAIIÞ DRILLER'S CASING DEPTH (FT): # BOREHOLE CONDITIONS MUD TYPE: MUD DENSITY (LB/G): MUD VISCOSITY (S): MUD PH: MUD CHLORIDES (PPM): FLUID LOSS (C3): RESISTIVITY (OHMM) AT TEMPERATURE (DEGF) MUD AT MEASURED TEMPERATURE (MT): MUD AT MAX CIRCULATING TERMPERATURE: MUD FILTRATE AT MT: MUD CAKE AT MT: # NEUTRON TOOL MATRIX: MATRIX DENSITY: HOLE CORRECTION (IN): # TOOL STANDOFF (IN): EWR FREQUENCY (HZ): # REMARKS: $ # Data Format Specification Record Data Record Type.... ..............0 Data Specification Block Type. ....0 Logging Direction... ............. . Down Optical log depth units.......... .Feet Data Reference Point............. . Undefined Frame Spacing.................... .60 .1IN Max frames per record............ .Undefined Absent value..................... .-999 Depth Units. . . . . . . . . . . . . . . . . . . . . . . Datum Specification Block sub-type...O 6.125 11928.0 . LSND 9.65 52.0 9.0 650 4.8 2.600 1. 250 3.250 2.800 72.0 156.6 74.0 76.0 Name Service Order Units Size Nsam Rep Code Offset Channel DEPT FT 4 1 68 0 1 ROP MWD050 FT/H 4 1 68 4 2 GR MWD050 API 4 1 68 8 3 RPX MWD050 OHMM 4 1 68 12 4 RPS MWD050 OHMM 4 1 68 16 5 RPM MWD050 OHMM 4 1 68 20 6 RPD MWD050 OHMM 4 1 68 24 7 FET MWD050 HOUR 4 1 68 28 8 First Last Name Service Unit Min Max Mean Nsam Reading Reading DEPT FT 11886.5 12310 12098.3 848 11886.5 12310 ROP MWD050 FT/H 6.97 207.69 40.2019 748 11936.5 12310 GR MWD050 API 39.06 146.05 103.747 751 11886.5 12261. 5 RPX MWD050 OHMM 1. 97 657.37 8.52242 745 11896.5 12268.5 RPS MWD050 OHMM 1. 98 1176.97 11.9764 745 11896.5 12268.5 RPM MWD050 OHMM 1.9 2000 120.852 745 11896.5 12268.5 RPD MWD050 OHMM 2.07 2000 126.24 746 11888.5 12268.5 FET MWD050 HOUR 0.669 79.6092 9.76488 745 11896.5 12268.5 First Reading For Entire File.. ....... .11886.5 Last Reading For Entire File.......... .12310 File Trailer service name........ ... .~LIB.006 service Sub Level Name. . . Version Number.......... .1.0.0 Date of Generation...... .04/02/11 Maximum Physical Record. .65535 File Type............... .LO Next File Name.. ........ .STSLIB.007 . Physical EOF Tape Trailer Service name...... ...... .LISTPE Date. . . . . . . . . . . . . . . . . . . . .04/02/11 Origin. . . . . . . . . . . . . . . . . . . STS Tape Name............... . UNKNOWN Continuation Number..... .01 Next Tape Name.......... . UNKNOWN Comments.. ........ ...... .STS LIS Writing Library. Scientific Technical Services Reel Trailer Service name............ .LISTPE Date.................... .04/02/11 Origin. . . . . . . . . . . . . . . . . . . STS Reel Name.... ........... . UNKNOWN Continuation Number..... .01 Next Reel Name.......... . UNKNOWN Comments................ .STS LIS Writing Library. Scientific Technical Services Physical EOF Physical EOF End Of LIS File