Alaska Logo
Department of Commerce, Community, and Economic Development
Alaska Oil and Gas Conservation
Commission
Loading...
HomeMy WebLinkAbout198-029 STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMMISS N • WELL COMPLETION OR RECOMPLETION REPORT AND LOG la. Well Status: Oil 0 Gas 0 SPLUG 0 Other 0 Abandoned 0 - Suspended 0 1b.Well Class: 20AAC 25.105 20AAC 25.110 Development 0 Exploratory 0 GINJ 0 WINJ 0 WAG 0 WDSPL ❑ No.of Completions: One Service ❑ Stratigraphic Test 0 2. Operator Name: 6. Date Comp.,Susp.,or Aband.: 14.Permit to Drill Number/Sundry BP Exploration(Alaska),Inc 11/15/2016 • -, 198-029 • 316-505 3. Address: 7. Date Spudded: 15. API Number: P.O.Box 196612 Anchorage,AK 99519-6612 3/23/1998 50-029-20887-01-00 • 4a. Location of Well(Governmental Section): 8. Date TD Reached: 16. Well Name and Number 3/28/1998 PBU 07-19A • Surface: 1479'FNL,608'FWL,Sec.34,T11N,R14E,UM • 9 Ref Elevations KB 58 17. Field/Pool(s): Top of Productive Interval: 5102'FNL,170'FWL,Sec.35,T11N,R14E,UM GL 27.35 BF 29.72 , PRUDHOE BAY,PRUDHOE OIL • Total Depth: 4788'FNL,1380'FEL,Sec.34,T11N,R14E,UM 10. Plug Back Depth(MD/TVD): 18. Property Designatij:ADi_" 3/Z • 10660'/8287' • ADL 028309&ADL 028308 4b. 4b.Location of Well(State Base Plane Coordinates,NAD 27): 11. Total Depth(MD/TVD): 19. Land Use Permit: (;„ 7 Surface:x- 676816 i y- 5949460• Zone - ASP 4 • 13150'/9031' - 74-064 TPI: x- 681749 y- 5945954 Zone - ASP 4 12. SSSV Depth(MD/TVD): P0. Thickness of Permafrost MD/TVD: Total Depth:x- 680191 y- 5946231 Zone - ASP 4 None 1900'(Approx.) 5. Directional or Inclination Survey: Yes 0 (attached) No 0 13. Water Depth,if Offshore: 21. Re-drill/Lateral Top Window MD/TVD: Submit electronic and printed information per 20 AAC 25.050 N/A (ft MSL) -11132'/8678' . 22. Logs Obtained List all logs run and,pursuant to AS 31.05.030 and 20 AAC 25.071,submit all electronic data and printed logs within 90 days of completion, suspension,or abandonment,whichever occurs first.Types of logs to be listed include,but are not limited to:mud log,spontaneous potential,gamma ray,caliper, resistivity,porosity,magnetic resonance,dipmeter,formation tester,temperature,cement evaluation,casing collar locator,jewelry,and perforation record. Acronyms may be used.Attach a separate page if necessary MWD&GR sCANNEO APR 23. CASING,LINER AND CEMENTING RECORD CASING WT.PER GRADE SETTING DEPTH MD SETTING DEPTH ND HOLE SIZE CEMENTING RECORD AMOUNT FT. PULLED TOP BOTTOM TOP BOTTOM 20" 91.5# H-40 31' 111' 31' 111' 30" 1900#Poleset 13-3/8" 72# L-80 30' 2526' 30' 2499' 17-1/2" 2030 sx Fondu,400 sx Permafrost'C' 9-5/8" 47# L-80/SO0-95 28' 10862' 28' 8452' 12-1/4" 500 sx Class'G',300 sx Permafrost'C' 7" 29# L-80 10574' 11132' 8218' 8678' 8-1/2" 325 sx Class'G' 2.7/8' 6.5# L-80 10723 13150' 8338' 9031' 3-3/4" 23 Bbls Class'G' 193' 24. Open to production or injection? Yes 0 No 0 25. TUBING RECORD If Yes,list each interval open(MD/TVD of Top and Bottom;Perforation GRADE DEPTH SET(MD) PACKER SET(MD/TV Size and Number): 4-1/2"12.6#13Cr80 10594' 10363'/8051' x 5-1/2"17#L-80 10509'/8166' IE'' RECEIVED 26. ACID,FRACTURE,CEMENT SQUEEZE,ETC. Was hydraulic fracturing used during completion? Yes ❑ No 0 `11155 l f # Per 20 AAC 25.283(i)(2)attach electronic and printed rV3C ;F ' DEC 14 201; information V DEPTH INTERVAL(MD) AMOUNT AND KIND OF MATERIAL USED CAOGC 10925' Set CIBP 10530'-10723' Cut and Pull 2-7/8"Liner 10660' Set Whipstock 27. PRODUCTION TEST Date First Production: Not on Production Method of Operation(Flowing,gas lift,etc.):N/A Date of Test: Hours Tested: Production for Oil-Bbl: Gas-MCF: Water-Bbl: Choke Size: Gas-Oil Ratio: Test Period �++► Flow Tubing Casing Press: Calculated Oil-Bbl: Gas-MCF: Water-Bbl: Oil Gravity-API(corn): Press 24 Hour Rate Form 10-407 Revised 11/2015 CONTINUED ON PAGE 2 Submit ORIGINAL only vri 1Z1! 17" f 1�y©� RBDMS �� DEC 1 2016, 3-r3- (7V 0 28. CORE DATA • Conventional Core(s) Yes 0 No ® • Sidewall Cores Yes 0 No 1 If Yes to either question,list formations and intervals cored(MD+TVD of top and bottom of each),and summarize lithology and presence of oil,gas or water (submit separate sheets with this form,if needed).Submit detailed descriptions,core chips,photographs and laboratory analytical results per 20 AAC 25.071. 29. GEOLOGIC MARKERS(List all formations and markers encountered): 30. FORMATION TESTS NAME MD TVD Permafrost-Top Well Tested? Yes 0 No I Permafrost-Base If yes,list intervals and formations tested,briefly summarizing test results.Attach Top of Productive Interval 11015' 8579' separate sheets to this form,if needed,and submit detailed test information per 20 AAC 25.071. Sadlerochit 11015' 8579' Formation at total depth: 31. List of Attachments: Summary of Pre-Rig Work,Summary of Daily Drilling Report,Wellbore Schematic Diagram Information to be attached includes,but is not limited to:summary of daily operations,wellbore schematic,directional or inclination survey,core analysis,paleontological report,production or well test results,per 20 AAC 25.070. 32.I hereby certify that the foregoing is true and correct to the best of my knowledge. Contact: Ciolkosz,Ryan R Email: Ryan.Ciolkosz@bp.com Printed Name: Joe Lastuf I Title: Drilling Technologist Signature: q Phone: +1 907 564 4091 Date: j 24(t1-/j(o ✓✓✓��` INSTRUCTIONS General:This form is designed for submitting a complete and correct well completion report and log on all types of lands and leases in Alaska.Submit a well schematic diagram with each 10-407 well completion report and 10-404 well sundry report when the downhole well design is changed. All laboratory analytical reports regarding samples or tests from a well must be submitted to the AOGCC,no matter when the analyses are conducted. Item 1 a. Multiple completion is defined as a well producing from more than one pool with production from each pool completely segregated.Each segregated pool is a completion. Item 1b.Well Class Service wells:Gas Injection,Water Injection,Water-Alternating-Gas Injection,Salt Water Disp,Water Supply for Injection,Observation or Other. Item 4b.TPI(Top of Producing Interval). Item 9. The Kelly Bushing and Ground Level elevations in feet above mean sea level.Use same as reference for depth measurements given in other spaces on this form and in any attachments. Item 15.The API number reported to AOGCC must be 14 digits(ex:50-029-20123-00-00). Item 20.Report true vertical thickness of permafrost in Box 20.Provide MD and TVD for the top and base of permafrost in Box 29. Item 22.Review the reporting requirements of 20 MC 25.071 and,pursuant to AS 31.05.030,submit all electronic data and printed logs within 90 days of completion,suspension,or abandonment,whichever occurs first. Item 23.Attached supplemental records should show the details of any multiple stage cementing and the location of the cementing tool. Item 24.If this well is completed for separate production from more than one interval(multiple completion),so state in item 1,and in item 23 show the producing intervals for only the interval reported in item 26.(Submit a separate form for each additional interval to be separately produced, showing the data pertinent to such interval). Item 27.Method of Operation:Flowing,Gas Lift,Rod Pump,Hydraulic Pump,Submersible,Water Injection,Gas Injection,Shut-in,or Other(explain). Item 28.Provide a listing of intervals cored and the corresponding formations,and a brief description in this box.Submit detailed description and analytical laboratory information required by 20 AAC 25.071. Item 30.Provide a listing of intervals tested and the corresponding formation,and a brief summary in this box.Submit detailed test and analytical laboratory information required by 20 AAC 25.071. Item 31.Pursuant to 20 MC 25.070,attach to this form:well schematic diagram,summary of daily well operations,directional or inclination survey,and other tests as required including,but not limited to:core analysis,paleontological report,production or well test results. Form 10-407 Revised 11/2015 Submit ORIGINAL Only • 07-19A Well History (Pre-Rig Sidetrack) WIIA' (SLB ELINE - PLUG/JET CUT) LRS PERFORMS L&K. SEE LRS WSR FOR DETAILS. RUN 1: SET WEATHERFORD 2-7/8" CIBP (2.2" OD, 10,000PSI RATING) MID ELEMENT AT 10925', (TOP AT 10924.5' ELMD). CCL TO ME = 9.55', CCL STOP DEPTH = 10915.45'. LRS PERFORMS PASSING MIT-T TO 2500 PSI. RUN 2: RIH W/2.125" OD POWERCUTTER, CUT 2-7/8" LINER AT 10723' ELMD (2' BELOW COLLAR). CCL TO CUTTER: 6.3', CCL STOP DEPTH: 10716.7'. 10/4/2016 ALL PASSES CORRELATED TO SLB MEMORY CNL BORAX LOG DATED 4-DEC-2001. T/I/0=2400/400/60 Temp=Sl Assist Eline w/ Load and Test MIT-T to 2500 psi **PASSED**(Pre CTD) Pumped 5 bbls of ambient meth followed by 290 bbls of 120* 1% KCL and 38 bbls of ambient DSL for TBG FP. E/L set plug. Pumped 19 bbls of diesel to achieve test pressure. TBG lost 102 psi/ 1st 15 min and 34 psi/2nd 15 min. Bled back 3 10/4/2016 bbls to FWHP= 240/530/243. SWS had control of the well upon departure. DSO notified of RAN 4 1/2" DOGLESS GS TO SPEAR @ 10,510' SLM (sheard) RAN 4 1/2" GS, UNABLE TO LATCH SPEAR @ 10,510' SLM SET 4 1/2"X-CATCHER @ 10,328' MD PULLED STA#3 RK-DGLV FROM 5714' SLM (5721' MD) SET STA#3 RK-FLOW SLV @ 5714' SLM (5721' MD) LRS LOADED IA W/395bbls OF DIESEL LRS FREEZE PROTECTED FLOW LINE W/80bbls OF CRUDE PULL RK-DMY GLV FROM ST#4 @ 3310' SLM(3320' MD). SET RK-LGLV(16/64", tro 1500psi) IN ST#4 @ 3310' SLM(3320' MD). 10/15/2016 SET RK-S/O GLV(20/64") IN ST#3 @ 5714' SLM (5721' MD) T/I/0=450/450/75 SI Assist SL with Circ Out (CTD) Pumped 5 bbls meth followed by 395 bbls DSL down IA up TBG out FL to circ well out with DSL. Pumped 5 bbls meth followed by 80 bbls crude down FL to FP. SL on well upon departure. CVs OTG Tags hung on WV 10/15/2016 FWHP=300/300/95 PULL EMPTY X-CATCHER FROM 10,312' SLM. RAN 3 1/2" GS, PULLED SPEAR &***4.6' OF DEPLOYMENT SLEEVE &CROSS OVER*** RAN 2-7/8" GR &WEATHERFORD 3.35"OD BDK RELEASABLE SPEAR (2.33"-2.50" GRAPPLE) LATCH UP TO LINER © 10,518' SLM. 10/16/2016 MAKE 1 ATTEMPT TO MOVE 2-7/8" LINER. RAN 2 7/8" GR, PULLED 2.33" -2.50" RELEASABLE SPEAR FROM LINER @ 10,516' SLM SPEAR WAS MISSING 1"x 1" GRAPPLE RAN 3.47" MAGNET TO 10,517' SLM (no recovery) PLANTED 3.35"WRS @ 10,515' SLM RAN 4 1/2" GS TO 3.35" OD WEATHERFORD BDK RELEASEABLE SPEAR WITH 2.33"- 2.50" GRAPPLE @ 10,513' SLM, PULLED 2 7/8" LINER UP HOLE TO 10,397' SLM SET LINER BACK @ 10,513' SLM RAN 4 1/2" GR, RETRIEVED WFD RELEASABLE SPEAR FROM 10,513' SLM ***WELL LEFT S/I DSO NOTIFIED ON DEPARTURE*** ****1"x 1" PIECE OF BROKEN GRAPPLE LEFT IN HOLE,**** ***IT IS INSIDE OF OR BELOW TOP OF LINER, WE WERE ABLE TO SPEAR*** ***LINER AND PULL IT UPHOLE 100' WITH NO ISSUES***(pic in well-pic-folder) 10/17/2016 • • 07-19A Well History (Pre-Rig Sidetrack) T/I/O = 350/180/80. Set 5: Gray"K" BPV#606 @ 132", set good. See log for details. 10/22/2016 FWHP's = BPV/180/80. T/I/O= BPV/0/0. Removed 5" FMC SSV to allow clearance for Nordic 2 . Installed upper tree and torqued and PT'd to API specs. Removed K-plug BPV#606 . Removed tree cap and installed TS#07 . Torqued and PT'd to API specs. RDMOSEE LOG FOR DETAILS. 10/23/2016 Final T/I/O= 350/0/0. Note: Hung tree/valve pressure test record on MV handle. T/I/O = 150/160/60. Temp = SI. Bleed WHPs (Pre CTD). No AL, scaffolding, wellhouse, flowline or SSV. IA FL @ surface. OA FL= near surface. Bled the IAP from 160 psi to 0 psi in 10 minutes (-5 gallons, BT). Bled the OAP from 60 psi to 0 psi in 5 minutes (all gas, BT). Monitored the WHPs for 30 minutes. IAP increased to 0 + and the OAP increased to 6 psi (re-bled to 0 psi before departrue). FWPs =150/0/0. 10/24/2016 SV, WV= C. MV= O. IA, OA= OTG. 1030 hrs. T/I/O = 150/10/10. Temp = SI. WHPs (Post bleed). No AL, scaffolding, wellhouse, flowline or SSV. IA FL @ surface, OA FL = near surface. IAP increased to 10 and the OAP increased 10 psi overnight. 10/25/2016 SV, WV= C. MV= O. IA, OA= OTG. 14:30 T/I/O = 190/40/20. Temp = SI. WHPs (Pre rig). No AL, scaffolding, wellhouse, flowline or SSV. T FL @ surface. IA FL @ surface. OA FL near surface. Bled TP from 190 to 0 psi in 45 min (0.75 bbls). TP increased 10 psi in 30 min. Bled IAP from 40 psi to 0 psi in 3 min (0.2 bbls). IAP unchanged in 30 min. Bled OAP from 20 psi to 0 psi in 2 min (0.1 bbls). OAP increased 5 psi in 30 min. FWHPs = 10Nac/5. 11/11/2016 SV, WV= C. MV= O. IA, OA= OTG. 15:00 • • North America-ALASKA-BP Page 1 Operation Summary Report Common Well Name:07-19 AFE No Event Type:RE-ENTER-ONSHORE(RON) Start Date:11/12/2016 End Date: X3-0182X-C:(3,809,892.00) Project:Prudhoe Bay Site:PB DS 07 Rig Name/No.:NORDIC 2 Spud Date/Time:1/11/1983 12:00:00AM Rig Release: Rig Contractor:NORDIC CALISTA UWI:500292088700 Active datum:Kelly Bushing/Rotary Table @58.00usft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (usft) 11/12/2016 16:00 - 16:20 0.33 MOB P PRE PREP TO MOVE OFF WELL 16:20 - 16:45 0.42 MOB P PRE PJSM TO MOVE OFF CURRENT WELL THEN OVER THE NEXT WELL -DISCUSSED WITH CREW THAT THERE IS NO BPV/TWC INSTALLED -ASSIGNED SPOTTERS TO AREA OF RESPONSIBILITY -DISCUSSED THAT"STOP"IS THE COMMAND !TO STOP RIG -PERFORMED RADIO CHECK PRIOR TO MOVING RIG i-VERIFIED 12 X 12 WHEEL CHOCK IN PLACE -TESTED AND VERIFIED ESD WAS FUNCTIONAL AND IS MANNED BY TOOLPUSHER 16:45 - 17:00 0.25 MOB P PRE ENSURE ALL TREE&CASING VALVES ARE .CLOSED TEST ESD GOOD TEST,MOVE OFF WELL CLOSE ALL TREE&CASING VALVES ON 7-19 17:00 - 17:30 0.50 MOB -P PRE MOVE DOWN PAD AND STAGE IN FRONT OF NEXT WELL TEST ESD AND POSITION THE 12X12 GOOD TEST ON THE ESD MOVE RIG OVER WELL 17:30 - 19:00 1.50 MOB P PRE RIG MOVED,ACCEPT RIG AT 17:30 MIRU STATE REP BRIAN BIXBY WAIVED WITNESSING OUR TEST. 19:00 - 20:00 1.00 MOB P PRE SPOT AUXILIARY EQUIPMENT. PUT HEATER ON CELLAR,CYCLE TREE VALVES. SPOT CUTTINGS BOX. CLEAN UP AROUND PREVIOUS WELL SO IT :CAN BE RELEASED BACK TO GOO. 20:00 - 22:00 2.00 MOB P PRE CONDUCT RIG MOVE CHECKLIST. GREASE CHOKE VALVES. DRAIN AND FLUSH MGS. REPLACE CHECK VALVE ON ACCUMULATOR {UNIT. INSPECT AND CLEAN OUT PUMP FILTERS AND SCREENS,HI AND LOW PRESSURE. 22:00 - 00:00 2.00 MOB P PRE LEAK TIGHT TEST ON SWAB AND MASTER VALVE,GOOD TEST. REMOVE TREE CAP. 11/13/2016 00:00 - 03:00 3.00 MOB P PRE INSTALL BOPS AND TIE BACK. RECORD BOP AND STACK MEASUREMENTS. 03:00 - 03:20 0.33 MOB P PRE RIG EVAC EXERCISE AND AAR WITH ORLOFF CREW. ALL PERONNEL MUSTER AND ACCOUNTED FOR IN 2 MIN. 03:20 - 04:30 1.17 BOPSUR P PRE FILL STACK AND MGS,PREP FOR BOP TEST. GET SHELL TEST THEN START BOP TEST. Printed 11/28/2016 1:07:08PM *AII depths reported in Drillers Depths* • J ("7".7///,'V... ! ,r.. ri Common Well Name.07-19 AFE No Event Type:RE-ENTER-ONSHORE(RON) Start Date:11/12/2016 End Date: X3-0182X-C:(3,809,892 00) Project:Prudhoe Bay Site:PB DS 07 Rig Name/No.:NORDIC 2 Spud Date/Time:1/11/1983 12:00:00AM Rig Release: Rig Contractor:NORDIC CALISTA UWI:500292088700 Active datum:Kelly Bushing/Rotary Table @58.00usft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (usft) 04:30 - 11:40 7.17 BOPSUR P PRE TEST BOPS AS PER BP,NORDIC,AND AOGCC REGS. TEST WITNESS IS WAIVED BY AOGCC BRIAN BIXBY. 11:40 - 12:10 0.50 BOPSUR P PRE BOPE TESTED,PU THE INJECTOR AND STAB ON WELL DISPLACE COIL TO KCL 12:10 - 13:00 0.83 BOPSUR P PRE GREASE CREW CHECKING TREE BOLTS 13:00 - 14:40 1.67 BOPSUR P PRE TEST IRV&PO TO COMPLETE THE BOP TEST PU THE INJECTOR AND INSTALL THE TEST SUB,PT REEL IRON TO 250 LOW AND 4700 HIGH MU THE NOZZLE BHAAND STAB ON 14:40 - 15:00 0.33 MOB P PRE PERFORM RIG EVAC DRILL WITH DAY CREW 15:00 - 15:15 0.25 FISH P DECOMP PT THE QTS 15:15 - 15:30 0.25 FISH P DECOMP OPEN WELL TO A CLOSED CHOKE INO PRESSURE,OPEN CHOKE AND PREP TO RIH TAKING ALL RETURNS OUT TO THE TIGER TANK 15:30 - 17:55 2.42 FISH P DECOMP WELL IS FULL IN&OUT RATES ARE 1:1 INITIAL ENTRY,RIH TAKING ALL RETURNS 'OUTSIDE 660'GETTING GAS BACK,MAINTAIN<150PSI DOWNSTREAM OF THE CHOKE 1000'STOP,SHUT IN CHOKE TO STRAP TT WE ARE CONTINUING TO GET GAS BACK AS WE RIH SO WE WILL NEED TO STOP EVERY 1000'AND CLOSE THE CHOKE TO STRAP THE TIGER TANK IAP=MAINTAIN<200 PSI WITH LIVE GLV'S BLED DOWN 2 TIMES WHILE RIH,ALL FLUID. WT CHECK AT 10,000'=41K&RIH WT=19K 10548 NO TAG YET,PU FOR WT CHECK,-42K, RIH LOOKING FORA LIGHT TAG 17:55 - 18:30 0.58 FISH P DECOMP LIGHT TAG AT 10563' PU TO YUP WT AND CIRC BOTTOMS UP AT MAX RATE TAKING ALL RETURNS OUT TO THE TT. BLEED IA TO ZERO. 18:30 - 19:20 0.83 FISH P DECOMP STOP CIRCULATING AND SI WELL,STRAP TIGER TANK. TANK AT 70%CAPACITY,VAC FLUID OUT OF TIGER TANK BEFORE CONTINUING. 19:20 - 21:40 2.33 FISH P DECOMP CONTINUE CIRCULATING. PAST 1 B/U NOW BUT RETURNS STILL FLUCTUATING A LITTLE. AFTER RETURNS STEADY OUT SHUT DOWN PUMP THEN BRING RETURNS INSIDE THROUGH THE MGS. PUMP 1 B/U THROUGH MGS. 1.49/1.48 BPM AT 750 PSI. Printed 11/28/2016 1:07:08PM *AII depths reported in Drillers Depths* North America-ALASKA-BP Page 3 CAI- . OperationSummary Report _...._.......... . Common Well Name:07-19 AFE No Event Type:RE-ENTER-ONSHORE(RON) Start Date:11/12/2016 End Date: X3-0182X-C:(3,809,892.00) Project:Prudhoe Bay Site:PB DS 07 Rig Name/No.:NORDIC 2 Spud Date/Time:1/11/1983 12:00:00AM Rig Release: Rig Contractor:NORDIC CALISTA UWI:500292088700 Active datum:Kelly Bushing/Rotary Table @58.00usft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (usft) 21:40 - 00:00 2.33 FISH P DECOMP AFTER 1 B/U SHUT DOWN PUMP,10 MIN FLOWCHECK IS GOOD,NO FLOW. USE NORDIC PROCEDURE TO PURGE CT RISER OF ANY RESIDUAL GAS. POOH,PUMP 2.12 BPM/1,340 PSI. MUD WEIGHT IN/OUT IS 8.37/8.39 PPG. ALL RETURNS THROUGH MGS WHILE POOH. BLEED IA TO ZERO. 11/14/2016 00:00 - 00:30 0.50 FISH P DECOMP AT SURFACE MONITOR WELL FOR 10 MIN, STATIC. REMOVE INJECTOR,BREAK OFF NOZZLE BHA. REMOVE INTERNAL CONNECTOR. 00:30 - 02:30 2.00 FISH P DECOMP INSTALL BTT SLIP CONNECTOR,PULL TEST AND PT IS GOOD. PJSM THEN MAKE UP BHA#2 FOR FISHING. 02:30 - 04:20 1.83 FISH P DECOMP ZERO COUNTERS,TEST QTS,RIH. PUMP 0.47 BPM/230 PSI. ALL RETURNS THROUGH MGS WHILE RIH. 04:20 - 07:25 3.08 FISH P DECOMP WEIGHT CHECK AT 10,450 FT IS 45K. TAG AT 10,562'. UP WEIGHT IS AROUND 47K,PICK UP 20 FT. STEADY UP WEIGHT ABOUT 2-3K MORE THAN THE WEIGHT CHECK. STACK ABOUT 5K BACK DOWN. CIRCULATE 2X B/U THROUGH MGS. FLAG PIPE AT 10,460 FT EOP. 07:25 - 07:40 0.25 FISH -- P DECOMP CIRCULATED 2 BOTTOMS UP THROUGH THE MGS WITH NO SIGNS OF GAS SHUT DOWN PUMP TO FLOW CHECK WELL 07:40 - 10:00 2.33 FISH P DECOMP GOOD NO FLOW,PINCH IN THE CHOKE AND HOLD 2-300 PSI WHP FOR TRIP OOH WE CANNOT PUMP DOWN THE COIL AS IT WILL PUT THE HYDRAULIC GS IN THE RELEASE POSTION 10:00 - 10:15 0.25 FISH P DECOMP OOH,FLOW CHECK WELL AND HOLD A PJSM TO PULL THE BHAAND LD THE LINER 10:15 - 11:30 1.25 FISH P DECOMP GOOD NO FLOW,PU THE INJECTOR AND POOH LOOKING FOR THE BHA SO WE DON'T HAVE TO RIH WITH THE BHA 11:30 - 12:00 0.50 EVAL P DECOMP BHA OOH AND ALL LINER RECOVERED. LINER IS CHECKED FOR NORM-OK. RECOVERED 6 FULL JOINTS,A PUP JT AND A PARTIAL CUT JT. TOTAL LENGTH OF FISH RECOVERED: 195.65' LOAD OUT LINER AND PREP TO PUMP SLACK LOAD COIL WITH FRESH WATER TO REVERSE SLACK 12:00 - 12:10 0.17 EVAL P DECOMP HOLD PJSM TO PUMP SLACK AND HEAD UP 12:10 - 14:00 1.83 EVAL DECOMP STAB ON WELL,CLOSE SWAB AND REVERSE CIRCULATE COIL PU THE INJECTOR AND CUT 286'FOR 1.8% SLACK NO WIRE AFTER CUTTING PIPE,MU A CTC AND NOZZLE TO PUMP SLACK FORWARD 14:00 - 14:10 0.17 EVAL P DECOMP PUMP SLACK FORWARD PU THE INJECTOR AND CHECK FOR WIRE TO HEAD UP BHI 14:10 - 15:00 0.83 EVAL P DECOMP WE HAVE WIRE,HEAD UP BHI UQC Printed 11/28/2016 1:07:08PM `AII depths reported in Drillers Depths* • North America-ALASKA-BP Page 4(0118 Operation Summary Report Common Well Name:07-19 AFE No Event Type:RE-ENTER-ONSHORE(RON) Start Date:11/12/2016 End Date: X3-0182X-C:(3,809,892.00) Project:Prudhoe Bay Site:PB DS 07 Rig Name/No.:NORDIC 2 Spud Date/Time:1/11/1983 12:00:00AM Rig Release: Rig Contractor:NORDIC CALISTA 1 UWI:500292088700 Active datum:Kelly Bushing/Rotary Table©58.00usft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (usft) 15:00 - 16:00 1.00 EVAL P DECOMP PT THE CTC TO 3500 PSI PT FLOATS TO 250 LOW AND 3500 HIGH 16:00 - 16:20 0.33 EVAL P DECOMP PJSM TO MU THE LOGGING DRIFT BHA 16:20 - 17:10 0.83 EVAL P DECOMP MU THE BHA SURFACE TEST CALIPER GOOD TEST,DEPLOY 17:10 - 19:00 1.83 EVAL P DECOMP RIH,PUMP 1.3 BPM/790 PSI THROUGH CT. 19:00 - 19:50 0.83 EVAL P DECOMP LOG TIE-IN FROM 10,290'. CORRECT-28.5'. CONTINUE RIH. LIGHT TAG AT 10,718',PICK UP(CLEAN)AND REPEAT,SAME DEPTH. 19:50 - 20:50 1.00 EVAL P DECOMP PARKAT 10,717'WAIT FOR ARMS TO OPEN. CALIPER ARMS OPEN AT 20:31,LOG UP TO 10,360'AT 50 FT/MIN. PARK AT 10,360'WAIT FOR ARMS TO CLOSE. 20:50 - 22:40 1.83 EVAL N DPRB DECOMP POOH. PUMP 1.5 BPM WHILE POOH, RETURNS THROUGH MGS. AT 9,160'NOTICE RETURNS GETTING LIGHT. STOP HERE AND FLOW CHECK WELL. 10 MIN PUMPS OFF FLOW CHECK IS GOOD, NO FLOW. RESUME PUMPING,SEE INDICATIONS OF GAS IN RETURNS FROM OUT MM READINGS. LINE UP TO TAKE RETURNS OUT TO TIGER TANK. MAKE NOTIFICATIONS TO WOS AND CTD SUPT. PUMP 1 B/U OUT TO TIGER TANK,HOLD 200 PSI WHP. RETURNS CLEAN UP AND OUT DENSITY IS STEADY 8.42 PPG AFTER A FEW MINUTES, HOWEVER CONTINUE WITH FULL B/U AS A PRECAUTION. AFTER 1 B/U OPEN CHOKE AND SHUT DOWN PUMP. FOLLOW NORDIC'S RISER PURGE PROCEDURE TO REMOVE ANY RESIDUAL GAS ABOVE THE FLOW CROSS. LINE UP THROUGH THE MGS AND FILL LINES, SHUT DOWN AND FLOWCHECK WELL. • 10 MIN PUMPS OFF FLOWCHECK IS GOOD, NO FLOW. 22:40 - 00:00 1.33 EVAL P DECOMP CONTINUE POOH,PUMP 2.04 BPM/1,350 PSI. RETURNS THROUGH MGS WHILE POOH. 11/15/2016 00:00 - 01:40 1.67 STWHIP P WEXIT CONTINUE POOH WITH CALIPER LOGGING BHA. PERFORM 10 MIN FLOW CHECK AT SURFACE, STATIC. OPEN RISER,BREAK OFF COILTRAK CONNECTION AND SET INJECTOR BACK. UD BHA#3. INJECTOR OFF AT 00:35. MAKE UP BHA#4-WHIPSTOCK SETTING BHA. INJECTOR ON AT 01:35. Printed 11/28/2016 1:07:08PM `AII depths reported in Drillers Depths* S • North America-ALASKA-BP Operation Summary Report Common Well Name:07-19 AFE No Event Type:RE-ENTER-ONSHORE(RON) Start Date:11/12/2016 End Date: X3-0182X-C:(3,809,892.00) Project:Prudhoe Bay Site:PB DS 07 Rig Name/No.:NORDIC 2 Spud Date/Time:1/11/1983 12:00:00AM Rig Release: Rig Contractor:NORDIC CALISTA UWI:500292088700 Active datum:Kelly Bushing/Rotary Table©58.00usft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (usft) 01:40 - 04:00 2.33 STWHIP P WEXIT ZERO COUNTERS,OPEN EDC,TEST QTS AND COILTRAK. RIH,PUMP 0.8 BPM/220 PSI THROUGH OPEN EDC. RETURNS THROUGH MGS. LOG TIE-IN FROM 10,310',CORRECT-29'. 04:00 - 05:20 1.33 STWHIP P WEXIT LOG CCL DOWN TO 11,710'BIT DEPTH JUST ABOVE THE TUBING STUMP. DISCUSS RESULTS WITH RIG TEAM AND ODE,DECIDE TO SET WHIPSTOCK AT 10,678' BIT DEPTH WHICH SHOULD PLACE THE PINCH POINT AT 10,664'WHEN STARTING THE WINDOW. CLOSE EDC AND PRESSURE UP,SETTING TOOL SHEARS OUT AT 2,700 PSI. RIH SLOWLY,SET 4.5K DOWN TO CONFIRM GOOD SET. PICK UP AND CIRCULATE 1 B/U THROUGH MGS HERE. 05:20 - 07:05 1.75 STWHIP P WEXIT OPEN EDC,PUMP 1 B/U WITH WATER AT 3 BPM THEN SWAP TO 10.6 PPG MUD 07:05 - 07:20 0.25 STWHIP P WEXIT 10.6 PPG MUD ALL THE WAYAROUND,SHUT DOWN,LINE UP TO NORMAL FLOW PATH AND 'FLOW CHECK WELL 07:20 - 08:30 1.17 STWHIP P WEXIT GOOD NO FLOW,POOH FOR THE WINDOW MILLING BHA 08:30 - 08:55 0.42 STWHIP P WEXIT STARTED SAVING FLUID A LITTLE EARLY AND LOWERED THE MUD WEIGHT IN THE PIT WE ARE PULLING FROM STOP POOH AT 3800'AND CIRC OUT LIGHT FLUID AND ISOLATE IT TO A SEPERATE PIT TO BRING BACK UP TO WEIGHT 08:55 - 09:45 0.83 STWHIP P WEXIT GOOD 10.6 PPG MUD IN THE COIL AND ON THE BACKSIDE. CONTINUE POOH OOH FLOW CHECK WELL. POP OFF WITH INJECTOR AT 0945 HRS. 09:45 - 13:30 3.75 STWHIP P WEXIT LAY DOWN BHA -FLUSH MUD GAS SEPARATOR WITH FRESH WATER. -CHANGE OUT HIGH PRESSURE SCREEN (HAD EXTREMELY HIGH PRESSURES,SEEMS TO BE PACKED OFF WITH MUD ADDITIVES). PRESSURE TEST IRON BREAK,GOOD TEST. -SWAP OUT TO BHA#5-3.80"MILLING BHA- AND STAB ON WITH INJECTOR 13:30 - 15:00 1.50 STWHIP N SFAL WEXIT STOP THE JOB AND CLOSE OFF AREA AROUND RIG FLOOR. RIG TEAM SENT UP TO KNOCK OFF AND CLEAN ICE OUT OF DERRICK. 15:00 - 17:00 2.00 STWHIP P WEXIT RIH WITH BHA#5. -GETTING CONSISTENT LARGE"PATTIES" ACROSS SHAKER. CONSULT WITH MUD ENGINEER,BELIEVES THAT COOL TEMPS ARE ADDING TO DIFFICULTY FOR MUD TO SHEAR WITH THE BAROTROL ADDITIVE IN THE SYSTEM. -RIH AT 1.2 BPM,1450 PSI -RUN DOWN TO LOGGING DEPTH Printed 11/28/2016 1:07:08PM *AII depths reported in Drillers Depths* i • North America-ALASKA-BP Page 6 CM Operation Summary Report Common Well Name:07-19 I AFE No Event Type:RE-ENTER-ONSHORE(RON) Start Date:11/12/2016 End Date: X3-0182X-C:(3,809,892.00) Project:Prudhoe Bay Site:PB DS 07 Rig Name/No.:NORDIC 2 Spud Date/Time:1/11/1983 12:00:00AM Rig Release: Rig Contractor:NORDIC CALISTA UWI:500292088700 Active datum:Kelly Bushing/Rotary Table©58.00usft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase I Description of Operations (hr) [ (usft) 17:00 - 17:30 0.50 i STWHIP P WEXIT LOG TIE IN WITH-32'CORRECTION. -DRY TAG WHIPSTOCK AT 10,666'. PICK UP WEIGHT OF 46K FROM WHIPSTOCK DEPTH. 17:30 - 18:00 0.50 STWHIP N FLUD WEXIT PICKUP AND CIRCULATE A BOTTOMS UP IN ATTEMPT TO GET CONSISTENT MUD PROPERTIES. LARGE"PATTIES"COMING [ACROSS CONSISTENTLY. 1-CIRCULATE BOTTOMS UP AT 3.49 BPM,3790 PSI WITH 10.69 PPG MUD WEIGHT ( -7 /i,r '18:00 - 00:00 6.00 STWHIP P WEXIT I OBTAIN MILLING PARAMETERS. EASE J'(/C�(JQ��R DOWN,BEGIN MILLING 7"BY\9-5/8"WINDOW / f'/ EXIT. 1 1 -MILL 3.80"WINDOW IN 7 x 9-5/8" CASING/LINER PER BAKER REP FROM 10,665.3'MD TO 10,668.9'MD -RATE:2.92 BPM IN,2.94 BPM OUT -MUD WEIGHT:10.66 PPG IN,10.58 PPG OUT -DWOB:3-4 KLBS CIRC PRESSURE:3,900 PSI -AT 20:40 BLEED IA FROM 450 PSI TO ZERO, BLEED OA FROM 650 PSI TO ZERO. 11/16/2016 00:00 - 06:00 6.00 STWHIP P WEXIT MILL 7"BY 9-5/8"WINDOW EXIT. -MILL 3.80"WINDOW IN 7 x 9-5/8" CASING/LINER PER BAKER REP FROM 10,668.9'MD TO 10,669.8'MD -RATE:2.92 BPM IN,2.94 BPM OUT -MUD WEIGHT:10.66 PPG IN,10.58 PPG OUT -DWOB:3-4 KLBS -CIRC PRESSURE:3,900 PSI 06:00 - 12:45 6.75 STWHIP P WEXIT MILL 3.80"WINDOW IN 7 x 9-5/8" 'CASING/LINER PER BAKER REP FROM 10,669.'MD TO 10,673.5'MD -RATE:2.93 BPM IN,2.95 BPM OUT MICROMOTION MUD WEIGHT:10.65 PPG IN, 10.57 PPG OUT -DWOB:3-4 KLBS -CIRC PRESSURE:3860-3900 PSI -PUMPED A 10-BBL HI-VIS SWEEP WHILE MAKING TRANSITION FROM 7"TO THE 9-5/8" WITH NOTHING REMARKABLE IN RETURN VOLUME OR CUTTING INCREASE. -NOTICING ERRATIC DIFFERENTIAL PRESSURES/WOB COMBINATIONS AT 10,671'DURING MILLING OPS. DOESN'T SEEM TO BE THE EXPECTED 9-5/8"CASING RESISTANCE EXPECTED. WOB DROPPING OFF QUICKLY. CONTINUE WITH BEING PATIENT AT TAKING SMALL BITES,CIRC SAMPLE UP FOR ANALYSIS. USE CONTROL MILL PROCESS AT 1 FPH TO ENSURE STRING REAMER CAN WORK THROUGH SLOWLY. -SAMPLE HAS TRACES OF STEEL AND CEMENT,MAJORITY SHALE. WOB DROPS 11 OFF VERY RAPIDLY DURING MILLING OPS. -CONTINUE WITH MILLING TO RUN STRING MILLACROSS WINDOW TO 10,673.5' Printed 11/28/2016 1:07:08PM *All depths reported in Drillers Depths* 1 TREE= 5"X7"L FMC 120 • TY NOTES:WELL ANGLE>—700 @ 11576' ACTT..IATOkZ= BAKER C 07-1 g q *'*4-1 i2"CHROME TBG*** OP .ELEV= 58' I�B-E1/= 58' / 23' 5-1/2"X 4-1/2"XO BF.B.E'L I 29'72' 20"GOND, — 1l '. . KO_P _�_�, _ _ 210_0 Mix Angle=-- 93"@ 12_086' 91.5#,H 40, Dratum&D= 11338' D=19.124" 2072' H4-1/2"HES X NP,ID=3.813' Datum TV D=---_8800 SS GAS LFT MANDRELS ST MD ! "+ DEV TYPE VLV LATCH PORT DATE 13-3/8"CSG,72#,L-80,D=12.347" t— 2556' 4 3320 3135 44 MMG DOME RK 16 10/16/16 L 3 5721 4878 48 AAMC' SO RK 20 10/16/16 2 8273 6491 45 MMG DM' RK 0 10130/06 1 10121 7861 41 MIG DMY RK 0 10/30/06 ' ' 10328' —I4-1/2"HES X NP,D=3.813' Minimum ID =2.372" @ 10534' 3-1/2" X 2-7/8" XO ® �— 10359' —I9-5/8"X 4-1/2"BKR S-3 PKR,ID=3.870" 10393' H4-1/2"HES X NP,D=3.813' 10459' H5-1/2"TBG STUB(TAGGED 10/26/06) J 10494' —I5-1/2BAKER PBRASSY 4-1/2"TBG,12.6#,13CR-80 VAM TOP, H 10484' I---�, �` 10509' H9-5/8"X 5-1/2"BAKER SAB PKR .0152 bpf,ID=3.958" 2S 5-1/2"TBG, 17#,L-80,.0232 bpf,D=4.892" H 10520' ----\ / 10520' —15-1/2"X 4-1/2"XO TOP OF 7"LNR H 10574' — ' ' 10580' —4-1/2 CAMCO DB-6 LANDING NP, ID=3.813"(BB11ND PIPE) 4-1(2"TBG, 12.6#,L-80,.0152 bpf,D=3.958" 10594' f \-------. 10592' I--4-1/2 BAKER SHEAROUT SUB(BEHIND LNR) W 7" HPSTOCK(11/15/16) H 10660' J 10593' —I 4-1/2"TBG TAE(BEHIND LNR) 9-5/8"CSG,47#,L-80/500-95,ID=8.681" H 10862' 10580' — ELMD TT LOGGED 09/08/86 TOP OF CEMENT(12/27/02) H 10880' 10723'ELM -II JET CUT(10/04/16) 7"LNR,29#,L-80,.0371 bpf,D=6.184" —I 11138' .1.1 _ is 10925' —I2-718"\NFD CIBP(10/04/16) 111 1111 11'1 0 MLLOUT WINDOW:11132'-11139' PERFORATION SUMMARY 1111. REF LOG:MWD GR ON 03/23/98 1111• ,11�AO.A+At 11823' CTM LNRDAMAGE 06/10/14 ANGLE AT TOP PERF:52"@ 11480' • ` H ( ) Note:Refer to Production DB for historical perf data 12180'_JH GBP(02/11/03) SIZE SPF NTT7VAL Opn/Sqz SHOT SQZ 4%p 2" 4 11480-11500 C 03/17/02 1-11/16" 4 11700-11850 C 03/31/98 1-11/16" 4 11900-12150 C 03/31/98 PBTD H 13114' I k .v 1-11/16" 4 12200-12350 C 03/31/98 1-11/16" 4 12450-12700 C 03/31/98 1-11/16" 4 12900-13112 C 03/30/98 2-7/8"LNR,6.5#,FL4S,.00579 bpf,D=2.441" — 13148' TD --I 13150' DATE REV BY COMMENTS DATE REV BY COMMENTS PRUDHOE BAY UNIT 04/23/83 ORIGINAL COMPLETION 10/18/16 JGUJMD FULLED DEPLOY SLV,XO-SET FISH WELL: 07-19A 04/01/98 SIDETRACK 10/18/16 JGUJMD GLV C/O(10/16/16) PERMf No:'1980290 11/03/06 D16 RVVO 10/19/16 JGUJMD ADDED NEW TOL DEPTH AP No: 50-029-20887-01 05/09/16 JGUJMD GLV CIO(05/04/16) SEC 34,T11 N,R14E 1479'FNL&608'FWL 10/03/16 JNUJMD UPDATED REF&BF ELEV,MOW 10/10/16 DHS/TLH CEPSET/TBG CUT(10/04/16) BP Exploration(Alaska) V .`g -0'24 Date:09/08/2016 • a Transmittal Number 0118 Lrs,ra;C t*4 rt P x-+rae RIGHT PLACE FIRST TIME. GYRODATA SURVEY TRANSMITTAL DATA LOGGED State of Alaska - AOGCC \o�av2ow RECEIVED m K BENDER Attn: Makana Bender (V" 333 W 7th Avenue, Suite 100 OCT 2 8 2016 Anchorage, AK 99501 AOGCC Enclosed are the materials listed below. If you have any questions,please contact Steve Thompson: 907-250-1200; Stevet@gyrodata.com or Jamie McCrimmon: 403-640-7755; Jamiem_. rodata.com. Drill Site SW Name Date Description 07 07-19A 09/10/2016 SURVEY REPORT: 1 Hard Copy; 1 Disk Ple e Sign and Return on copy of thimittal to:gancpdc bp.com,aksurveys(gyrodata.com Thank You, Steve Thompson SCANNED NOV 0 32016 Gyrodata Inc. Gyrodata Incorporated 23000 Northwest Lake Drive Houston,TX 77095 • • 2'1.Co Co`( y► *Ciata RECEWED OCT 28 2016 GC BP Exploration (Alaska) Inc. Drill Site 07 07-19A Prudhoe Bay Unit 1 OF 12 AK0916GCM138 • . WO/data A Gyrodata Directional Survey for BP EXPLORATION (ALASKA) INC. Lease: Drill Site 07 Well: 07-19A Location: Wellhead, Prudhoe Bay Unit Job Number: AK0916GCM138 Run Date: 10 Sep 2016 Surveyor: Adam O'Connor Calculation Method: MINIMUM CURVATURE Survey surface coordinates obtained from: Drilling Engineer Survey Latitude: 70.267476 deg. N Longitude: 148.570140 deg. W Azimuth Correction: None - Gyro: Bearings are Relative to True North Depth Reference: Rotary Table Air Gap ( RKB to MSL): 58.00 Closure Calculated from Well Head Location Horizontal Coordinates Calculated from Well Head Location 2 OF 12 AK0916GCM138 • • gymdata A Gyrodata Directional Survey ' BP Exploration (Alaska) Inc. Lease: Drill Site 07 Well: 07-19A Location: Wellhead, Prudhoe Bay Unit Job Number: AK0916GCM138 MEASURED INCL AZIMUTH VERTICAL HORIZONTAL CLOSURE DOGLEG DEPTH DEPTH COORDINATES DIST. AZIMUTH SEVERITY feet deg. deg. feet feet feet deg. deg./ 100 ft. 0.00 0.00 0.00 0.00 0.00 N 0.00 E 0.0 0.0 0.00 0 - 11,000' RATE GYROSCOPIC CONTINUOUS MULTISHOT SURVEY RUN INSIDE 4.5"TUBING ALL MEASURED DEPTHS AND COORDINATES REFERENCED TO RKB ELEVATION OF 58.00' AMSL BF TO MSL: 29.72'/ BF TO SWAB: 10.7'/SWAB TO GYRO: 7.0'/ ZERO GYRO ON SWAB AT+10.58' 100.00 0.36 183.89 100.00 0.31 S 0.02 W 0.3 183.9 0.36 200.00 0.22 180.11 200.00 0.82 S 0.04 W 0.8 183.0 0.14 300.00 0.42 171.89 300.00 1.37 S 0.01 E 1.4 179.7 0.20 400.00 0.45 178.02 399.99 2.13 S 0.07 E 2.1 178.0 0.06 500.00 0.36 176.01 499.99 2.83 S 0.11 E 2.8 177.8 0.10 600.00 0.49 169.51 599.99 3.56 S 0.21 E 3.6 176.7 0.14 700.00 0.45 172.61 699.98 4.37 S 0.34 E 4.4 175.6 0.05 800.00 0.39 146.01 799.98 5.04 S 0.58 E 5.1 173.5 0.20 900.00 0.42 130.39 899.98 5.55 S 1.04 E 5.7 169.4 0.11 1000.00 0.39 118.51 999.98 5.95 S 1.62 E 6.2 164.8 0.09 1100.00 0.21 88.11 1099.98 6.11 S 2.10 E 6.5 161.0 0.24 1200.00 0.22 72.72 1199.98 6.05 S 2.47 E 6.5 157.8 0.06 1300.00 0.21 55.28 1299.97 5.88 S 2.81 E 6.5 154.5 0.07 1400.00 0.78 123.38 1399.97 6.15 S 3.53 E 7.1 150.1 0.73 1500.00 3.43 135.76 1499.89 8.67 5 6.19 E 10.7 144.5 2.67 1600.00 5.77 140.54 1599.57 14.70 S 11.47 E 18.6 142.0 2.37 1700.00 6.36 141.65 1699.01 22.93 S 18.11 E 29.2 141.7 0.60 1800.00 6.35 139.00 1798.39 31.44 S 25.17 E 40.3 141.3 0.29 1900.00 6.26 130.30 1897.79 39.14 S 32.96 E 51.2 139.9 0.96 2000.00 7.87 110.39 1997.04 45.06 S 43.54 E 62.7 136.0 2.91 2100.00 11.43 104.36 2095.61 49.90 S 59.56 E 77.7 130.0 3.70 2125.00 12.16 105.00 2120.08 51.20 S 64.50 E 82.4 128.4 2.97 2150.00 13.04 106.23 2144.48 52.67 S 69.75 E 87.4 127.1 3.68 2175.00 13.96 108.73 2168.79 54.43 S 75.32 E 92.9 125.9 4.36 2200.00 14.60 110.51 2193.02 56.50 S 81.12 E 98.9 124.9 3.10 2225.00 15.53 112.27 2217.16 58.87 S 87.17 E 105.2 124.0 4.15 2250.00 16.34 113.17 2241.20 61.52 S 93.50 E 111.9 123.3 3.39 2275.00 17.11 113.57 2265.14 64.38 S 100.11 E 119.0 122.7 3.11 2300.00 17.73 113.30 2288.99 67.35 S 106.97 E 126.4 122.2 2.50 2325.00 18.49 113.28 2312.76 70.43 S 114.11 E 134.1 121.7 3.04 2350.00 19.24 113.30 2336.41 73.62 S 121.54 E 142.1 121.2 3.00 2375.00 20.10 112.80 2359.95 76.92 S 129.28 E 150.4 120.8 3.51 2400.00 21.12 111.83 2383.35 80.26 S 137.42 E 159.1 120.3 4.30 2425.00 21.84 111.62 2406.62 83.64 S 145.93 E 168.2 119.8 2.90 3 OF 12 AK0916GCM138 0 • A Gyrodata Directional Survey BP Exploration (Alaska) Inc. Lease: Drill Site 07 Well: 07-19A Location: Wellhead, Prudhoe Bay Unit Job Number: AK0916GCM138 MEASURED INCL AZIMUTH VERTICAL HORIZONTAL CLOSURE DOGLEG DEPTH DEPTH COORDINATES DIST. AZIMUTH SEVERITY feet deg. deg. feet feet feet deg. deg./ 100 ft. 2450.00 22.64 110.99 2429.76 87.08 S 154.74 E 177.6 119.4 3.34 2475.00 23.61 110.30 2452.75 90.54 S 163.93 E 187.3 118.9 4.03 2500.00 24.42 110.03 2475.58 94.05 S 173.48 E 197.3 118.5 3.27 2525.00 24.93 110.11 2498.30 97.63 S 183.28 E 207.7 118.0 2.04 2550.00 25.73 110.52 2520.90 101.34 S 193.31 E 218.3 117.7 3.28 2575.00 26.45 111.20 2543.35 105.26 S 203.59 E 229.2 117.3 3.12 2600.00 27.07 111.88 2565.67 109.39 S 214.06 E 240.4 117.1 2.77 2625.00 28.18 113.07 2587.82 113.83 S 224.77 E 251.9 116.9 4.96 2650.00 29.22 113.90 2609.75 118.61 S 235.78 E 263.9 116.7 4.45 2675.00 30.13 114.53 2631.47 123.69 S 247.06 E 276.3 116.6 3.85 2700.00 31.16 115.00 2652.98 129.03 S 258.63 E 289.0 116.5 4.23 2725.00 31.51 115.06 2674.33 134.53 S 270.41 E 302.0 116.4 1.41 2750.00 31.90 115.26 2695.60 140.11 5 282.31 E 315.2 116.4 1.62 2775.00 32.62 115.63 2716.74 145.85 S 294.36 E 328.5 116.4 2.99 2800.00 33.47 116.51 2737.70 151.84 S 306.60 E 342.1 116.3 3.90 2825.00 34.16 117.25 2758.47 158.13 S 319.01 E 356.1 116.4 3.21 2850.00 34.84 117.90 2779.07 164.69 S 331.56 E 370.2 116.4 3.09 2875.00 35.40 118.62 2799.52 171.50 S 344.23 E 384.6 116.5 2.79 2900.00 36.07 120.05 2819.81 178.65 S 356.95 E 399.2 116.6 4.28 2925.00 36.65 121.16 2839.95 186.20 S 369.71 E 414.0 116.7 3.51 2950.00 37.06 121.62 2859.95 194.01 S 382.51 E 428.9 116.9 1.98 2975.00 38.28 122.92 2879.74 202.17 S 395.43 E 444.1 117.1 5.82 3000.00 38.96 123.33 2899.27 210.69 S 408.49 E 459.6 117.3 2.91 3025.00 39.94 123.92 2918.58 219.49 S 421.72 E 475.4 117.5 4.20 3050.00 41.33 124.56 2937.55 228.65 5 435.18 E 491.6 117.7 5.80 3075.00 41.77 124.55 2956.26 238.06 5 448.83 E 508.1 117.9 1.76 3100.00 42.32 124.61 2974.82 247.56 S 462.62 E 524.7 118.2 2.21 3125.00 42.90 124.67 2993.22 257.18 S 476.54 E 541.5 118.4 2.33 3150.00 43.34 124.64 3011.47 266.90 S 490.60 E 558.5 118.5 1.76 3175.00 43.88 124.58 3029.57 276.69 5 504.79 E 575.7 118.7 2.17 3200.00 44.27 124.51 3047.53 286.55 S 519.12 E 593.0 118.9 1.57 3225.00 44.52 124.49 3065.40 296.46 S 533.53 E 610.4 119.1 1.00 3250.00 44.69 124.50 3083.19 306.40 S 548.00 E 627.8 119.2 0.68 3275.00 44.93 124.46 3100.93 316.37 5 562.52 E 645.4 119.4 0.97 3300.00 45.09 124.43 3118.61 326.37 S 577.10 E 663.0 119.5 0.65 3325.00 44.89 124.71 3136.29 336.40 S 591.66 E 680.6 119.6 1.13 3350.00 44.88 124.45 3154.00 346.42 S 606.18 E 698.2 119.7 0.74 3375.00 44.99 124.44 3171.70 356.40 S 620.75 E 715.8 119.9 0.44 3400.00 44.84 124.38 3189.40 366.38 S 635.31 E 733.4 120.0 0.62 3425.00 45.05 124.35 3207.10 376.35 S 649.89 E 751.0 120.1 0.84 4 OF 12 AK0916GCM138 • i A Gyrodata Directional Survey BP Exploration (Alaska) Inc. Lease: Drill Site 07 Well: 07-19A Location: Wellhead, Prudhoe Bay Unit Job Number: AK0916GCM138 MEASURED INCL AZIMUTH VERTICAL HORIZONTAL CLOSURE DOGLEG DEPTH DEPTH COORDINATES DIST. AZIMUTH SEVERITY feet deg. deg. feet feet feet deg. deg./ 100 ft. 3450.00 44.83 124.30 3224.79 386.31 S 664.47 E 768.6 120.2 0.89 3475.00 44.95 124.24 3242.50 396.24 S 679.05 E 786.2 120.3 0.51 3500.00 45.02 124.27 3260.19 406.19 S 693.66 E 803.8 120.4 0.29 3525.00 44.83 124.25 3277.89 416.13 S 708.25 E 821.4 120.4 0.76 3550.00 44.71 124.21 3295.64 426.03 S 722.81 E 839.0 120.5 0.49 3575.00 44.83 124.23 3313.38 435.93 S 737.36 E 856.6 120.6 0.48 3600.00 44.74 124.26 3331.13 445.84 S 751.92 E 874.2 120.7 0.37 3625.00 44.65 124.33 3348.90 455.75 S 766.45 E 891.7 120.7 0.41 3650.00 44.49 124.43 3366.71 465.66 S 780.93 E 909.2 120.8 0.70 3675.00 44.25 124.67 3384.58 475.57 S 795.33 E 926.7 120.9 1.17 3700.00 44.23 124.81 3402.49 485.51 S 809.66 E 944.1 120.9 0.40 3725.00 44.12 124.97 3420.42 495.48 S 823.95 E 961.5 121.0 0.63 3750.00 44.07 125.08 3438.38 505.46 S 838.20 E 978.8 121.1 0.37 3775.00 44.11 125.18 3456.33 515.47 S 852.42 E 996.2 121.2 0.32 3800.00 43.97 125.08 3474.30 525.47 S 866.64 E 1013.5 121.2 0.63 3825.00 44.05 125.07 3492.28 535.45 S 880.85 E 1030.8 121.3 0.32 3850.00 44.03 125.07 3510.25 545.44 S 895.07 E 1048.2 121.4 0.08 . 3875.00 43.84 124.97 3528.26 555.39 S 909.28 E 1065.5 121.4 0.81 3900.00 43.88 124.98 3546.28 565.32 S 923.47 E 1082.8 121.5 0.16 3925.00 43.88 124.96 3564.30 575.25 S 937.67 E 1100.1 121.5 0.06 3950.00 43.59 124.99 3582.37 585.16 S 951.84 E 1117.3 121.6 1.16 3975.00 43.61 125.07 3600.47 595.06 5 965.95 E 1134.5 121.6 0.23 4000.00 43.60 125.04 3618.57 604.96 S 980.07 E 1151.7 121.7 0.09 4025.00 43.52 125.00 3636.69 614.84 S 994.18 E 1168.9 121.7 0.34 4050.00 43.51 125.02 3654.82 624.72 S 1008.28 E 1186.1 121.8 0.07 4075.00 43.31 124.97 3672.98 634.57 S 1022.35 E 1203.3 121.8 0.81 4100.00 43.28 124.94 3691.18 644.40 S 1036.40 E 1220.4 121.9 0.15 4125.00 43.13 124.93 3709.40 654.20 5 1050.43 E 1237.5 121.9 0.60 4150.00 43.02 124.89 3727.66 663.97 S 1064.43 E 1254.5 122.0 0.45 4175.00 43.13 124.91 3745.92 673.74 S 1078.44 E 1271.6 122.0 0.44 4200.00 43.07 124.87 3764.18 683.51 S 1092.45 E 1288.7 122.0 0.26 4225.00 43.08 124.92 3782.44 693.28 S 1106.45 E 1305.7 122.1 0.14 4250.00 43.00 124.93 3800.71 703.04 S 1120.44 E 1322.7 122.1 0.32 4275.00 43.07 124.92 3818.98 712.81 S 1134.43 E 1339.8 122.1 0.28 4300.00 42.95 124.90 3837.27 722.57 S 1148.41 E 1356.8 122.2 0.48 4325.00 42.81 124.82 3855.58 732.29 S 1162.37 E 1373.8 122.2 0.60 4350.00 42.42 124.77 3873.98 741.95 S 1176.27 E 1390.7 122.2 1.57 4375.00 42.51 124.78 3892.42 751.58 S 1190.14 E 1407.6 122.3 0.36 4400.00 42.35 124.83 3910.88 761.21 S 1203.99 E 1424.4 122.3 0.65 4425.00 42.46 124.78 3929.34 770.83 S 1217.83 E 1441.3 122.3 0.46 5 OF 12 AK0916GCM138 0 • gyrodata A Gyrodata Directional Survey BP Exploration (Alaska) Inc. Lease: Drill Site 07 Well: 07-19A Location: Wellhead, Prudhoe Bay Unit Job Number: AK0916GCM138 MEASURED INCL AZIMUTH VERTICAL HORIZONTAL CLOSURE DOGLEG DEPTH DEPTH COORDINATES DIST. AZIMUTH SEVERITY feet deg. deg. feet feet feet deg. deg./ 100 ft. 4450.00 42.29 124.75 3947.81 780.44 S 1231.67 E 1458.1 122.4 0.68 4475.00 42.28 124.74 3966.30 790.02 S 1245.49 E 1474.9 122.4 0.05 4500.00 42.00 124.71 3984.84 799.58 S 1259.28 E 1491.7 122.4 1.12 4525.00 41.91 124.75 4003.43 809.10 S 1273.02 E 1508.4 122.4 0.38 4550.00 41.73 124.77 4022.06 818.61 S 1286.71 E 1525.0 122.5 0.72 4575.00 41.68 124.84 4040.73 828.10 S 1300.37 E 1541.7 122.5 0.27 4600.00 41.64 124.88 4059.40 837.60 S 1314.00 E 1558.3 122.5 0.19 4625.00 41.24 124.89 4078.15 847.06 S 1327.58 E 1574.8 122.5 1.60 4650.00 41.22 124.92 4096.95 856.49 S 1341.09 E 1591.3 122.6 0.11 4675.00 41.24 124.91 4115.75 865.92 S 1354.60 E 1607.7 122.6 0.08 4700.00 41.07 124.90 4134.57 875.33 S 1368.09 E 1624.2 122.6 0.68 4725.00 41.20 124.81 4153.40 884.73 S 1381.59 E 1640.6 122.6 0.57 4750.00 40.87 124.82 4172.26 894.10 S 1395.06 E 1657.0 122.7 1.32 4775.00 40.68 124.84 4191.19 903.43 S 1408.47 E 1673.3 122.7 0.76 4800.00 40.81 124.80 4210.13 912.75 S 1421.86 E 1689.6 122.7 0.53 4825.00 40.80 124.81 4229.05 922.07 S 1435.28 E 1705.9 122.7 0.05 4850.00 41.00 124.76 4247.95 931.41 S 1448.72 E 1722.3 122.7 0.81 • 4875.00 41.06 124.67 4266.81 940.76 S 1462.21 E 1738.7 122.8 0.34 4900.00 41.20 124.54 4285.64 950.09 S 1475.74 E 1755.1 122.8 0.66 4925.00 41.47 124.56 4304.41 959.46 S 1489.34 E 1771.6 122.8 1.08 4950.00 41.73 124.50 4323.11 968.87 S 1503.02 E 1788.2 122.8 1.05 4975.00 41.89 124.45 4341.74 978.30 S 1516.76 E 1804.9 122.8 0.65 5000.00 42.17 124.44 4360.31 987.77 S 1530.56 E 1821.6 122.8 1.12 5025.00 41.99 124.43 4378.87 997.24 5 1544.38 E 1838.4 122.9 0.72 5050.00 42.27 124.47 4397.41 1006.73 5 1558.21 E 1855.1 122.9 1.13 5075.00 42.54 124.46 4415.87 1016.27 S 1572.11 E 1872.0 122.9 1.08 5100.00 42.74 124.49 4434.26 1025.86 S 1586.07 E 1888.9 122.9 0.80 5125.00 42.75 124.60 4452.62 1035.48 S 1600.05 E 1905.9 122.9 0.30 5150.00 43.00 124.66 4470.94 1045.14 S 1614.04 E 1922.9 122.9 1.01 5175.00 43.16 124.80 4489.20 1054.87 S 1628.07 E 1939.9 122.9 0.75 5200.00 43.47 124.93 4507.39 1064.68 S 1642.15 E 1957.1 1210 1.29 5225.00 43.27 125.20 4525.56 1074.54 S 1656.20 E 1974.2 123.0 1.09 5250.00 43.47 125.28 4543.73 1084.44 S 1670.22 E 1991.4 123.0 0.83 5275.00 43.80 125.28 4561.83 1094.41 S 1684.30 E 2008.6 123.0 1.32 5300.00 44.10 125.30 4579.83 1104.43 5 1698.47 E 2026.0 123.0 1.20 5325.00 44.32 125.27 4597.75 1114.50 S 1712.70 E 2043.4 123.1 0.88 5350.00 44.52 125.23 4615.60 1124.60 S 1726.98 E 2060.9 123.1 0.81 5375.00 44.75 125.25 4633.39 1134.74 S 1741.33 E 2078.4 123.1 0.92 5400.00 45.08 125.16 4651.10 1144.91 S 1755.75 E 2096.1 123.1 1.34 5425.00 45.21 125.14 4668.73 1155.11 S 1770.24 E 2113.8 123.1 0.52 6 OF 12 AK0916GCM138 • 0 A Gyrodata Directional Survey BP Exploration (Alaska) Inc. Lease: Drill Site 07 Well: 07-19A Location: Wellhead, Prudhoe Bay Unit Job Number: AK0916GCM138 MEASURED INCL AZIMUTH VERTICAL HORIZONTAL CLOSURE DOGLEG DEPTH DEPTH COORDINATES DIST. AZIMUTH SEVERITY feet deg. deg. feet feet feet deg. deg,/ 100 ft. 5450.00 45.48 125.11 4686.30 1165.35 S 1784.79 E 2131.6 123.1 1.08 5475.00 45.55 125.05 4703.82 1175.60 S 1799.39 E 2149.4 123.2 0.33 5500.00 45.89 125.07 4721.27 1185.88 S 1814.04 E 2167.3 123.2 1.36 5525.00 46.05 125.06 4738.65 1196.21 S 1828.75 E 2185.2 123.2 0.64 5550.00 46.16 124.94 4755.98 1206.54 S 1843.51 E 2203.2 123.2 0.56 5575.00 46.39 124.90 4773.26 1216.88 S 1858.32 E 2221.3 123.2 0.93 5600.00 46.70 124.91 4790.46 1227.26 S 1873.20 E 2239.4 123.2 1.24 5625.00 47.12 124.91 4807.53 1237.71 S 1888.17 E 2257.7 123.2 1.68 5650.00 47.37 124.91 4824.51 1248.22 S 1903.23 E 2276.0 123.3 1.00 5675.00 47.78 124.90 4841.37 1258.78 S 1918.36 E 2294.5 123.3 1.64 5700.00 48.14 124.94 4858.11 1269.41 S 1933.59 E 2313.0 123.3 1.44 5725.00 48.27 124.70 4874.77 1280.05 S 1948.89 E 2331.7 123.3 0.88 5750.00 48.92 124.89 4891.31 1290.75 S 1964.28 E 2350.4 123.3 2.66 5775.00 49.27 124.76 4907.68 1301.54 S 1979.80 E 2369.3 123.3 1.45 • 5800.00 49.59 124.75 4923.94 1312.37 S 1995.40 E 2388.3 123.3 1.28 5825.00 49.96 124.79 4940.08 1323.25 S 2011.08 E 2407.4 123.3 1.49 . 5850.00 50.10 124.77 4956.14 1334.18 S 2026.81 E 2426.5 123.4 0.56 5875.00 50.32 124.77 4972.14 1345.13 S 2042.59 E 2445.7 123.4 0.88 5900.00 50.54 124.79 4988.07 1356.13 S 2058.42 E 2465.0 123.4 0.88 5925.00 50.50 124.72 5003.96 1367.13 S 2074.28 E 2484.3 123.4 0.27 5950.00 50.39 124.70 5019.88 1378.10 S 2090.12 E 2503.6 123.4 0.44 5975.00 50.58 124.74 5035.79 1389.09 S 2105.97 E 2522.8 123.4 0.77 6000.00 50.51 124.77 5051.68 1400.09 S 2121.83 E 2542.1 123.4 0.29 6025.00 50.83 124.81 5067.52 1411.13 5 2137.71 E 2561.5 123.4 1.29 6050.00 51.16 124.82 5083.26 1422.22 S 2153.66 E 2580.9 123.4 1.32 6075.00 51.22 124.90 5098.92 1433.35 S 2169.65 E 2600.4 123.5 0.35 6100.00 50.85 125.21 5114.65 1444.52 S 2185.56 E 2619.8 123.5 1.77 6125.00 51.17 125.22 5130.38 1455.72 S 2201.44 E 2639.2 123.5 1.28 6150.00 51.45 125.24 5146.00 1466.98 S 2217.38 E 2658.7 123.5 1.12 6175.00 51.64 125.28 5161.55 1478.28 S 2233.36 E 2678.3 123.5 0.77 6200.00 51.91 125.34 5177.02 1489.63 5 2249.39 E 2697.9 123.5 1.10 6225.00 51.65 125.45 5192.49 1501.01 S 2265.40 E 2717.5 123.5 1.10 6250.00 51.76 125.57 5207.98 1512.40 S 2281.37 E 2737.2 123.5 0.58 6275.00 51.97 125.65 5223.42 1523.85 S 2297.36 E 2756.8 123.6 0.88 6300.00 52.22 125.74 5238.78 1535.36 S 2313.38 E 2776.5 123.6 1.04 6325.00 52.49 125.78 5254.05 1546.93 S 2329.44 E 2796.3 123.6 1.09 6350.00 52.91 125.81 5269.19 1558.56 S 2345.57 E 2816.2 123.6 1.68 6375.00 53.09 125.85 5284.24 1570.25 S 2361.76 E 2836.1 123.6 0.73 6400.00 53.20 125.91 5299.23 1581.98 S 2377.97 E 2856.1 123.6 0.48 6425.00 53.60 125.96 5314.14 1593.75 S 2394.22 E 2876.2 123.7 1.61 7 OF 12 AKO916GCM138 • A Gyrodata Directional Survey BP Exploration (Alaska) Inc. Lease: Drill Site 07 Well: 07-19A Location: Wellhead, Prudhoe Bay Unit Job Number: AK0916GCM138 MEASURED INCL AZIMUTH VERTICAL HORIZONTAL CLOSURE DOGLEG DEPTH DEPTH COORDINATES DIST. AZIMUTH SEVERITY feet deg. deg. feet feet feet deg. deg./ 100 ft. 6450.00 53.37 126.01 5329.02 1605.56 S 2410.48 E 2896.2 123.7 0.93 6475.00 53.61 126.03 5343.89 1617.38 S 2426.73 E 2916.3 123.7 0.96 6500.00 53.52 126.07 5358.74 1629.21 S 2442.99 E 2936.4 123.7 0.38 6525.00 53.64 126.10 5373.58 1641.06 S 2459.25 E 2956.5 123.7 0.49 6550.00 53.52 126.06 5388.42 1652.91 S 2475.51 E 2976.6 123.7 0.50 6575.00 53.45 126.11 5403.30 1664.74 S 2491.74 E 2996.7 123.7 0.32 6600.00 53.33 126.16 5418.21 1676.58 S 2507.95 E 3016.7 123.8 0.51 6625.00 53.19 126.18 5433.16 1688.40 S 2524.12 E 3036.8 123.8 0.56 6650.00 53.29 126.25 5448.12 1700.23 S 2540.28 E 3056.8 123.8 0.46 6675.00 53.27 126.28 5463.07 1712.09 S 2556.44 E 3076.8 123.8 0.13 6700.00 53.33 126.32 5478.01 1723.95 S 2572.59 E 3096.8 123.8 0.27 6725.00 53.26 126.33 5492.95 1735.83 S 2588.74 E 3116.8 123.8 0.28 6750.00 53.58 126.33 5507.85 1747.72 S 2604.92 E 3136.9 123.9 1.28 6775.00 53.54 126.32 5522.70 1759.63 S 2621.12 E 3157.0 123.9 0.16 6800.00 53.69 126.27 5537.53 1771.55 S 2637.34 E 3177.1 123.9 0.62 6825.00 53.75 126.28 5552.33 1783.47 S 2653.59 E 3197.2 123.9 0.24 6850.00 54.15 126.33 5567.04 1795.44 S 2669.88 E 3217.4 123.9 1.61 6875.00 54.43 126.29 5581.63 1807.46 S 2686.23 E 3237.7 123.9 1.13 6900.00 54.19 126.34 5596.22 1819.48 S 2702.60 E 3258.0 123.9 0.97 6925.00 54.32 126.28 5610.82 1831.50 5 2718.95 E 3278.3 124.0 0.56 6950.00 54.00 126.29 5625.46 1843.49 S 2735.28 E 3298.5 124.0 1.28 6975.00 53.78 126.31 5640.19 1855.45 S 2751.56 E 3318.7 124.0 0.88 7000.00 54.06 126.31 5654.91 1867.41 S 2767.84 E 3338.9 124.0 1.12 7025.00 54.04 126.32 5669.59 1879.40 S 2784.15 E 3359.1 124.0 0.09 7050.00 54.08 126.35 5684.26 1891.39 S 2800.45 E 3379.3 124.0 0.19 7075.00 54.22 126.31 5698.91 1903.40 S 2816.78 E 3399.6 124.0 0.57 7100.00 54.12 126.35 5713.54 1915.41 S 2833.11 E 3419.8 124.1 0.42 7125.00 54.25 126.37 5728.17 1927.42 S 2849.43 E 3440.1 124.1 0.52 7150.00 54.21 126.35 5742.78 1939.45 S 2865.77 E 3460.4 124.1 0.17 7175.00 53.99 126.31 5757.44 1951.45 S 2882.08 E 3480.6 124.1 0.89 7200.00 53.81 126.20 5772.17 1963.39 S 2898.37 E 3500.8 124.1 0.80 7225.00 53.38 126.18 5787.01 1975.27 S 2914.61 E 3520.9 124.1 1.72 7250.00 52.92 126.12 5802.00 1987.08 S 2930.77 E 3540.9 124.1 1.85 7275.00 52.60 126.09 5817.13 1998.80 S 2946.85 E 3560.8 124.1 1.28 7300.00 51.90 126.10 5832.44 2010.45 S 2962.82 E 3580.5 124.2 2.80 7325.00 52.10 126.11 5847.83 2022.06 S 2978.73 E 3600.2 124.2 0.80 7350.00 52.09 126.13 5863.19 2033.69 S 2994.67 E 3619.9 124.2 0.07 7375.00 51.36 126.19 5878.67 2045.27 S 3010.51 E 3639.5 124.2 2.93 7400.00 51.25 126.21 5894.30 2056.79 5 3026.26 E 3659.0 124.2 0.44 7425.00 51.26 126.32 5909.95 2068.32 S 3041.98 E 3678.5 124.2 0.35 8 OF 12 AK0916GCM138 • s A Gyrodata Directional Survey BP Exploration (Alaska) Inc. Lease: Drill Site 07 Well: 07-19A Location: Wellhead, Prudhoe Bay Unit Job Number: AK0916GCM138 MEASURED INCL AZIMUTH VERTICAL HORIZONTAL CLOSURE DOGLEG DEPTH DEPTH COORDINATES DIST. AZIMUTH SEVERITY feet deg. deg. feet feet feet deg. deg./ 100 ft. 7450.00 51.06 126.35 5925.63 2079.86 S 3057.67 E 3698.0 124.2 0.81 7475.00 50.73 126.51 5941.40 2091.38 S 3073.28 E 3717.4 124.2 1.41 7500.00 49.98 126.56 5957.35 2102.84 S 3088.74 E 3736.6 124.2 3.00 7525.00 49.50 126.54 5973.50 2114.20 S 3104.07 E 3755.7 124.3 1.92 7550.00 48.83 126.61 5989.85 2125.47 S 3119.26 E 3774.6 124.3 2.69 7575.00 47.98 126.70 6006.45 2136.63 S 3134.26 E 3793.3 124.3 3.41 7600.00 47.60 126.90 6023.24 2147.73 S 3149.09 E 3811.8 124.3 1.63 7625.00 47.04 127.07 6040.19 2158.78 S 3163.77 E 3830.1 124.3 2.30 7650.00 46.84 127.14 6057.26 2169.80 S 3178.33 E 3848.4 124.3 0.83 7675.00 46.75 127.07 6074.38 2180.80 S 3192.87 E 3866.6 124.3 0.41 7700.00 46.61 127.10 6091.53 2191.76 S 3207.38 E 3884.7 124.3 0.57 7725.00 46.57 127.11 6108.71 2202.72 S 3221.86 E 3902.9 124.4 0.16 7750.00 46.71 127.08 6125.87 2213.68 S 3236.36 E 3921.0 124.4 0.57 7775.00 46.57 127.09 6143.04 2224.64 S 3250.86 E 3939.2 124.4 0.56 7800.00 46.59 127.08 6160.22 2235.59 S 3265.35 E 3957.3 124.4 0.09 7825.00 46.65 127.11 6177.39 2246.55 S 3279.84 E 3975.5 124.4 0.26 7850.00 46.49 127.10 6194.58 2257.50 S 3294.32 E 3993.6 124.4 0.64 7875.00 46.51 127.14 6211.79 2268.45 S 3308.78 E 4011.7 124.4 0.14 7900.00 46.54 127.13 6228.99 2279.40 S 3323.24 E 4029.8 124.4 0.12 7925.00 46.60 127.09 6246.17 2290.35 S 3337.72 E 4048.0 124.5 0.27 7950.00 46.46 127.05 6263.37 2301.29 S 3352.20 E 4066.1 124.5 0.57 7975.00 46.12 127.08 6280.65 2312.18 S 3366.62 E 4084.2 124.5 1.36 8000.00 46.16 127.03 6297.97 2323.04 S 3381.00 E 4102.2 124.5 0.22 8025.00 45.97 127.07 6315.32 2333.89 S 3395.37 E 4120.1 124.5 0.77 8050.00 45.74 127.08 6332.73 2344.71 S 3409.68 E 4138.1 124.5 0.92 8075.00 45.65 127.11 6350.19 2355.50 S 3423.95 E 4155.9 124.5 0.37 8100.00 45.52 127.12 6367.69 2366.27 S 3438.19 E 4173.8 124.5 0.52 8125.00 45.14 127.09 6385.26 2377.00 S 3452.37 E 4191.5 124.5 1.52 8150.00 45.14 127.14 6402.90 2387.69 S 3466.50 E 4209.2 124.6 0.14 8175.00 45.05 127.14 6420.55 2398.38 S 3480.62 E 4226.9 124.6 0.36 8200.00 44.81 127.13 6438.24 2409.04 S 3494.70 E 4244.6 124.6 0.96 8225.00 44.80 127.23 6455.98 2419.69 S 3508.73 E 4262.2 124.6 0.28 8250.00 44.64 127.41 6473.75 2430.35 S 3522.72 E 4279.7 124.6 0.82 8275.00 44.62 127.37 6491.54 2441.02 S 3536.68 E 4297.3 124.6 0.14 8300.00 44.26 127.30 6509.39 2451.63 S 3550.59 E 4314.8 124.6 1.45 8325.00 44.11 127.25 6527.31 2462.19 S 3564.46 E 4332.2 124.6 0.62 8350.00 44.06 127.42 6545.27 2472.74 S 3578.29 E 4349.5 124.6 0.51 8375.00 44.00 127.44 6563.25 2483.30 S 3592.09 E 4366.9 124.7 0.25 8400.00 43.75 127.49 6581.27 2493.84 S 3605.84 E 4384.2 124.7 1.01 8425.00 43.49 127.46 6599.37 2504.33 S 3619.53 E 4401.4 124.7 1.04 9 OF 12 AK0916GCM138 • • gYrOdata A Gyrodata Directional Survey BP Exploration (Alaska) Inc. Lease: Drill Site 07 Well: 07-19A Location: Wellhead, Prudhoe Bay Unit Job Number: AK0916GCM138 MEASURED INCL AZIMUTH VERTICAL HORIZONTAL CLOSURE DOGLEG DEPTH DEPTH COORDINATES DIST. AZIMUTH SEVERITY feet deg. deg. feet feet feet deg. deg./ 100 ft. 8450.00 43.45 127.54 6617.51 2514.80 S 3633.17 E 4418.6 124.7 0.27 8475.00 43.22 127.55 6635.69 2525.25 S 3646.77 E 4435.7 124.7 0.92 8500.00 42.99 127.57 6653.95 2535.67 S 3660.32 E 4452.8 124.7 0.92 8525.00 42.85 127.62 6672.25 2546.05 S 3673.81 E 4469.8 124.7 0.58 8550.00 42.65 127.73 6690.61 2556.43 S 3687.24 E 4486.8 124.7 0.85 8575.00 42.57 127.82 6709.01 2566.79 S 3700.62 E 4503.7 124.7 0.40 8600.00 42.04 128.02 6727.50 2577.13 S 3713.89 E 4520.5 124.8 2.19 8625.00 41.87 128.08 6746.09 2587.44 S 3727.05 E 4537.2 124.8 0.70 8650.00 41.84 128.19 6764.71 2597.74 S 3740.17 E 4553.8 124.8 0.32 8675.00 41.66 128.20 6783.36 2608.03 S 3753.26 E 4570.4 124.8 0.72 8700.00 41.24 128.26 6802.10 2618.27 5 3766.25 E 4586.9 124.8 1.69 8725.00 41.13 128.27 6820.92 2628.47 S 3779.18 E 4603.4 124.8 0.44 8750.00 40.78 128.36 6839.80 2638.63 S 3792.04 E 4619.7 124.8 1.42 8775.00 40.66 128.39 6858.75 2648.75 5 3804.82 E 4636.0 124.8 0.49 8800.00 40.39 128.47 6877.75 2658.85 5 3817.55 E 4652.2 124.9 1.10 8825.00 40.09 128.65 6896.83 2668.91 5 3830.18 E 4668.3 124.9 1.29 8850.00 39.88 128.57 6915.99 2678.94 5 3842.73 E 4684.4 124.9 0.86 8875.00 39.69 128.74 6935.20 2688.93 5 3855.22 E 4700.3 124.9 0.88 8900.00 39.54 128.83 6954.46 2698.92 5 3867.65 E 4716.2 124.9 0.64 8925.00 39.70 128.82 6973.71 2708.91 S 3880.07 E 4732.1 124.9 0.64 8950.00 39.87 128.90 6992.93 2718.95 S 3892.53 E 4748.1 124.9 0.71 8975.00 40.14 128.92 7012.08 2729.04 S 3905.03 E 4764.1 124.9 1.08 9000.00 40.40 129.03 7031.15 2739.21 S 3917.59 E 4780.3 125.0 1.08 9025.00 40.27 129.09 7050.21 2749.40 S 3930.16 E 4796.4 125.0 0.54 9050.00 40.63 129.11 7069.23 2759.63 S 3942.75 E 4812.6 125.0 1.44 9075.00 40.94 129.19 7088.16 2769.94 S 3955.41 E 4828.9 125.0 1.26 9100.00 41.04 129.20 7107.03 2780.31 S 3968.12 E 4845.2 125.0 0.40 9125.00 41.16 129.31 7125.87 2790.71 S 3980.85 E 4861.6 125.0 0.56 9150.00 41.26 129.44 7144.68 2801.15 S 3993.58 E 4878.0 125.0 0.53 9175.00 41.54 129.38 7163.43 2811.65 S 4006.35 E 4894.5 125.1 1.13 9200.00 41.84 129.56 7182.10 2822.22 S 4019.19 E 4911.1 125.1 1.29 9225.00 41.65 129.69 7200.75 2832.84 S 4032.01 E 4927.7 125.1 0.84 9250.00 41.73 129.73 7219.42 2843.46 S 4044.80 E 4944.3 125.1 0.34 9275.00 42.00 129.75 7238.04 2854.13 S 4057.63 E 4960.9 125.1 1.08 9300.00 42.09 129.80 7256.60 2864.84 S 4070.50 E 4977.6 125.1 0.38 9325.00 42.38 129.96 7275.11 2875.61 S 4083.39 E 4994.3 125.2 1.24 9350.00 42.52 130.06 7293.56 2886.46 5 4096.32 E 5011.1 125.2 0.62 9375.00 42.75 130.02 7311.95 2897.35 S 4109.28 E 5028.0 125.2 0.93 9400.00 43.11 130.20 7330.26 2908.32 S 4122.30 E 5045.0 125.2 1.52 9425.00 42.91 130.39 7348.54 2919.35 S 4135.31 E 5062.0 125.2 0.95 10 OF 12 AK0916GCM138 • • gyro,' ta • • A Gyrodata Directional Survey BP Exploration (Alaska) Inc. Lease: Drill Site 07 Well: 07-19A Location: Wellhead, Prudhoe Bay Unit Job Number: AK0916GCM138 MEASURED INCL AZIMUTH VERTICAL HORIZONTAL CLOSURE DOGLEG DEPTH DEPTH COORDINATES DIST. AZIMUTH SEVERITY feet deg. deg. feet feet feet deg. deg./ 100 ft. 9450.00 42.88 130.61 7366.85 2930.40 S 4148.25 E 5078.9 125.2 0.61 9475.00 43.16 130.62 7385.13 2941.51 S 4161.20 E 5095.9 125.3 1.12 9500.00 43.12 130.81 7403.37 2952.66 S 4174.15 E 5112.9 125.3 0.54 9525.00 43.16 131.09 7421.62 2963.86 S 4187.06 E 5129.9 125.3 0.78 9550.00 43.28 131.18 7439.83 2975.12 S 4199.96 E 5146.9 125.3 0.54 9575.00 43.06 131.42 7458.07 2986.41 S 4212.81 E 5164.0 125.3 1.10 9600.00 43.21 131.53 7476.31 2997.73 S 4225.61 E 5180.9 125.4 0.67 9625.00 43.16 131.63 7494.54 3009.09 S 4238.41 E 5198.0 125.4 0.34 9650.00 43.21 131.71 7512.77 3020.46 S 4251.19 E 5215.0 125.4 0.30 9675.00 43.10 131.88 7531.01 3031.86 S 4263.94 E 5232.0 125.4 0.64 9700.00 43.08 132.05 7549.26 3043.28 S 4276.64 E 5248.9 125.4 0.47 9725.00 42.90 131.91 7567.55 3054.68 S 4289.31 E 5265.9 125.5 0.81 9750.00 42.98 132.02 7585.85 3066.07 S 4301.98 E 5282.8 125.5 0.44 9775.00 42.57 132.09 7604.20 3077.44 S 4314.58 E 5299.6 125.5 1.65 ' 9800.00 42.54 132.16 7622.62 3088.78 S 4327.12 E 5316.4 125.5 0.22 9825.00 42.47 132.12 7641.05 3100.12 S 4339.65 E 5333.2 125.5 0.30 9850.00 42.17 132.06 7659.53 3111.40 S 4352.14 E 5349.9 125.6 1.21 9875.00 42.13 132.13 7678.07 3122.64 S 4364.59 E 5366.6 125.6 0.25 9900.00 41.93 132.25 7696.64 3133.89 S 4376.99 E 5383.2 125.6 0.86 9925.00 41.69 132.35 7715.27 3145.10 S 4389.32 E 5399.8 125.6 1.00 9950.00 41.63 132.29 7733.95 3156.29 S 4401.60 E 5416.3 125.6 0.29 9975.00 41.40 132.40 7752.67 3167.45 S 4413.85 E 5432.8 125.7 0.97 10000.00 41.29 132.54 7771.44 3178.60 S 4426.03 E 5449.2 125.7 0.57 10025.00 41.04 132.58 7790.26 3189.73 S 4438.15 E 5465.5 125.7 1.01 10050.00 40.74 132.64 7809.16 3200.81 S 4450.20 E 5481.7 125.7 1.21 10075.00 40.52 132.61 7828.13 3211.84 S 4462.17 E 5497.9 125.7 0.88 10100.00 40.35 132.60 7847.16 3222.81 S 4474.11 E 5514.0 125.8 0.68 10125.00 40.19 133.15 7866.23 3233.81 S 4485.95 E 5530.0 125.8 1.56 10150.00 39.70 133.09 7885.40 3244.78 S 4497.67 E 5546.0 125.8 1.97 10175.00 39.84 133.44 7904.62 3255.74 S 4509.31 E 5561.8 125.8 1.06 10200.00 39.60 133.30 7923.85 3266.71 S 4520.93 E 5577.7 125.9 1.02 10225.00 39.27 133.35 7943.15 3277.61 S 4532.48 E 5593.4 125.9 1.33 10250.00 39.04 133.46 7962.54 3288.45 S 4543.95 E 5609.0 125.9 0.96 10275.00 38.94 133.63 7981.97 3299.29 S 4555.35 E 5624.6 125.9 0.59 10300.00 38.75 133.83 8001.44 3310.13 S 4566.68 E 5640.2 125.9 0.91 10325.00 38.54 134.13 8020.97 3320.97 S 4577.91 E 5655.6 126.0 1.13 10350.00 38.74 134.18 8040.50 3331.85 S 4589.11 E 5671.1 126.0 0.81 10375.00 37.84 134.31 8060.12 3342.65 S 4600.21 E 5686.4 126.0 3.61 10400.00 38.03 134.72 8079.84 3353.43 S 4611.17 E 5701.6 126.0 1.26 10425.00 37.92 134.71 8099.54 3364.25 S 4622.10 E 5716.8 126.0 0.44 11 OF 12 AK09166CM138 i 0 gymdata • • A Gyrodata Directional Survey BP Exploration (Alaska) Inc. Lease: Drill Site 07 Well: 07-19A Location: Wellhead, Prudhoe Bay Unit Job Number: AK0916GCM138 MEASURED INCL AZIMUTH VERTICAL HORIZONTAL CLOSURE DOGLEG DEPTH DEPTH COORDINATES DIST. AZIMUTH SEVERITY feet deg. deg. feet feet feet deg. deg./ 100 ft. 10450.00 37.97 134.89 8119.26 3375.08 S 4633.01 E 5732.0 126.1 0.49 10475.00 37.49 135.40 8139.03 3385.93 S 4643.80 E 5747.1 126.1 2.29 10500.00 37.78 135.67 8158.83 3396.82 S 4654.49 E 5762.2 126.1 1.33 10525.00 37.26 136.07 8178.66 3407.75 S 4665.10 E 5777.2 126.1 2.30 10550.00 37.04 136.32 8198.58 3418.65 S 4675.55 E 5792.1 126.2 1.07 10575.00 37.37 136.87 8218.49 3429.63 S 4685.93 E 5806.9 126.2 1.87 10600.00 36.54 137.46 8238.47 3440.65 S 4696.15 E 5821.7 126.2 3.61 10625.00 36.35 137.62 8258.58 3451.61 S 4706.18 E 5836.2 126.3 0.85 10650.00 35.93 138.05 8278.77 3462.54 S 4716.07 E 5850.7 126.3 1.96 10675.00 35.87 138.49 8299.02 3473.48 S 4725.83 E 5865.0 126.3 1.06 10700.00 35.69 139.06 8319.31 3484.47 S 4735.47 E 5879.3 126.3 1.52 10725.00 35.62 139.50 8339.62 3495.51 5 4744.97 E 5893.5 126.4 1.06 10750.00 35.71 139.57 8359.93 3506.60 S 4754.43 E 5907.7 126.4 0.40 • 10775.00 35.55 139.84 8380.25 3517.71 S 4763.85 E 5921.9 126.4 0.90 10800.00 35.17 139.96 8400.64 3528.78 5 4773.17 E 5935.9 126.5 1.55 10825.00 35.02 140.48 8421.09 3539.82 S 4782.37 E 5949.9 126.5 1.34 10850.00 34.63 141.07 8441.62 3550.88 S 4791.39 E 5963.7 126.5 2.06 10875.00 33.65 142.55 8462.31 3561.91 S 4800.07 E 5977.3 126.6 5.14 10900.00 33.38 143.39 8483.15 3572.93 S 4808.38 E 5990.5 126.6 2.15 10925.00 33.41 142.79 8504.02 3583.93 S 4816.65 E 6003.7 126.7 1.33 10950.00 33.28 142.48 8524.91 3594.85 S 4824.99 E 6016.9 126.7 0.86 10975.00 33.21 142.81 8545.82 3605.75 S 4833.30 E 6030.1 126.7 0.78 11000.00 32.99 142.27 8566.76 3616.58 S 4841.61 E 6043.2 126.8 1.47 Final Station Closure: Distance: 6043.25 ft Az: 126.76 deg. 12 OF 12 AK0916GCM138 OF T • • • *.Q\1,1//j��� THE STATE Alaska Oil and Gas OfAT /0SKA Conservation Commission _ _ 333 West Seventh Avenue "ice ' GOVERNOR BILL WALKER Anchorage, Alaska 99501-3572 ."� Main: 907.279.1433 Fax: 907.276.7542 www.aogcc.alaska.gov John Egbejimba SCANNED FEB. 2 7 2017, Drilling Supervisor BP Exploration(Alaska), Inc. P.O. Box 196612 Anchorage,AK 99519-6612 Re: Prudhoe Bay Field,Prudhoe Bay Oil Pool,PBU 07-19A Permit to Drill Number: 198-029 Sundry Number: 316-505 Dear Mr. Egbejimba: Enclosed is the approved application for sundry approval relating to the above referenced well. Please note the conditions of approval set out in the enclosed form. As provided in AS 31.05.080, within 20 days after written notice of this decision, or such further time as the AOGCC grants for good cause shown,a person affected by it may file with the AOGCC an application for reconsideration. A request for reconsideration is considered timely if it is received by 4:30 PM on the 23rd day following the date of this letter, or the next working day if the 23rd day falls on a holiday or weekend. Sincerely, Cathy . Foerster Chair DATED this /4ay of October,2016. RBDMS UW;W 1 4 2016 D STATE OF ALASKA •ALASKA OIL AND GAS CONSERVATION COMMIN I[T 0 3 Q I6 APPLICATION FOR SUNDRY APPROVALS fo 3 • 20 AAC 25.280 ! r �+ 1. Type of Request: Abandon 0 Plug Perforations ❑ Fracture Stimulate 0 Repair Well 0 'L ti t o 0 Suspend 0 Perforate 0 Other Stimulate 0 Pull Tubing 0 Change Approved Program ❑ Plug for Redrill ®• Perforate New Pool 0 Re-enter Susp Well ❑ Alter Casing 0 Other 0 2. Operator Name: BP Exploration(Alaska),Inc 4. Current Well Class: • 5. Permit to Drill Number: 198-029 • 1 Address: P.O.Box 196612 Anchorage,AK Exploratory 0 Development 99519-66126.6. API Number: 50-029-20887-01-00 . Stratigraphic 0 Service ❑ 7. If perforating: 8. Well Name and Number: What Regulation or Conservation Order governs well spacing in this pool? Will planned perforations require a spacing exception? Yes 0 No ® PBU 07-19A • 9. Property Designation(Lease Number): 10. Field/Pools: ADL 028309&028308 ' PRUDHOE BAY,PRUDHOE OIL• 11. PRESENT WELL CONDITION SUMMARY Total Depth MD(ft): Total Depth TVD(ft): Effective Depth MD: Effective Depth ND: MPSP(psi): Plugs(MD): Junk(MD): 13150 • 9031 • 12180 9037 2418 12180 None Casing Length Size MD TVD Burst Collapse Structural Conductor 80 20" 31 -111 31 -111 1490 470 Surface 2496 13-3/8" 30-2526 30-2499 4930 2670 Intermediate 10835 9-5/8" 28-10862 28-8452 6870/8150 4760/508 Liner 558 7" 10574-11132 8218-8678 8160 7020 Liner 2620 2-7/8" 10530-13150 8183-9031 10570 11160 Perforation Depth MD(ft): Perforation Depth TVD(ft): Tubing Size: Tubing Grade: Tubing MD(ft): 11480-13112 8971-9030 4-1/2",12.6#x 5-1/2",17# 13Cr80/L-80 26-10594 Packers and SSSV Type: 4-1/2"Baker S-3 Packer Packers and SSSV MD(ft)and TVD(ft): 10363/8051 5-1/2"Baker SAB Packer 4 10509/8166 12.Attachments: Proposal Summary ® Wellbore Schematic 0 13.Well Class after proposed work: Detailed Operations Program 0 BOP Sketch ® Exploratory 0 Stratigraphic ❑ Development I I Service ❑ 14.Estimated Date for Commencing Operations: October 15,2016 15. Well Status after proposed work: Oil 0 WINJ ❑ WDSPL 0 Suspended I I 16.Verbal Approval: Date: GAS 0 WAG 0 GSTOR 0 SPLUG 0 Commission Representative: GINJ 0 Op Shutdown 0 Abandoned 0 17.I hereby certify that the foregoing is true and the procedure approved herein will not Contact Ciolkosz,Ryan R be deviated from without prior written approval. Email Ryan.Ciolkosz@bp.com Printed Name Joh�n/E/gbejimba Title Drilling Supervisor Signature/�/}' ' . °y(/S.g Phone +1 907 564 4139 Date I O/,�/ice 0 I 6 V� COMMISSION USE ONLY Conditions of approval:Notify Commission so that a representative may witness Sundry Number: � 3)(0 -505 Plug Integrity 0 BOP Test II Mechanical Integrity Test 0 Location Clearance 0 Other: r30 P re--5 i- f0 3 5-0O , 5 r q_ f / �' t�5 O v 5 I 5 1 I 4-rt r�v i a r pre-v- f� i-Cw �5 /' Cu e r rrti z� 7` G r—v V C ' ‘ �, -',1 6 frrn.l'fii p 1 v1 9 t-� O 7e/` 7 i Z Cr r Post Initial Injection MIT Req'd? Yes 0 No J/ 1 f�/t 2 S° Spacing Exception Required? Yes 0 No 11d Subsequent Form Required: i/' ' •- 4 2 Wef7 APPROVED BYTHE /% Approved by COMMISSIONER COMMISSION Dater / ./ 'CIL_ /0//Z ii loORIGINAL RSF---- lb 1,-2, 11(.., RBDMS w (jt;l 1 4 2016 J2Q4.4 Submit Form and Form 10-403 Revised 11/2015 Approved application is valid for 12 months from the date of approval. Attachgrerits in Duplicate • • • To: Alaska Oil &Gas Conservation Commission From: Ryan Ciolkoszz0 0 CTD Engineer Date: October 3, 2016 Re: 07-19A Sundry Approval Sundry approval is requested to plug the 07-19A wellbore as part of the drilling and completion of the proposed 07-19B CTD sidetrack. 07-19A, is a Z2A/2BI horizontal well that was drilled in early 1998. Initial rates were close to 3000 bopd and the well produced full time for about 2 years until it was shut-in for integrity problems in mid-2005. The well was repaired and returned to production in late 2006 and it demonstrated strong re-charge producing full- time for almost 1.5 years.. Finally in 2014 a well work intervention attempted to mill the cibp but was unsuccessful and had to be aborted. This left the well with no remaining well work options. Currently the well has no remaining value. Proposed plan: Drill a through tubing sidetrack with the Nordic 2 Coiled Tubing Drilling rig on or around November 15st, 2016. Nordic 2 will mill a 3.80"window in the 7" liner and drill 4-1/4 hole to the top of the sag river at 10,862 ' MD. MU 3-1/4" Liner run and set. Drill 3.25 at TD at 13,590' MD. The lateral will be completed with a 2-3/8" L-80 liner which will be cemented and perforated. This Sundry covers plugging the existing 07-19A perforations via the 07-19B liner cement iob or liner top packer set post-rig (alternate plug placement per 20 AAC 25.112(i)) and via posi-set plug. The following describes work planned and is submitted as an attachment to Form 10-403. A schematic diagram of the current wellbore and proposed sidetrack is attached for reference. 004, /4_s ,61. �� 20/6 e / y�r�S /5' 4SIC-, /677 CliC/C ,1 co�c�f• --14e we an' D� rfee- INC// � /`j ` 4 f r 7J 14e 4,0 (off 444f cre4,1 q(fb been 4,,/ obi t,^vireA �l ' qtr we nOn -COPfe 'ti re and ire (re 41'1 water Celt ,•no(:C at-5 c O J 1 / �YF awGiy from �(t{ a5 yi6d1U rob j 47� e Ur fUe&01 of ?41 .' f'� �;ke /�Iif 81/ 1 y io dct'ay L rti a PU 4'0- GAP it 4bve �°d , r ►1, rv�' 9 11°A ©f f e rQ �I, ; ll Stool d all is �ro"d /e GD' ` fpr Pool, /°/9/ • • CTD Drill and Complete 07-19B program: Pre-Rig Start Date: Oct 15st, 2016 Pre-Rig Work 1. E Set CIBP. Jet Cut 2-7/8" Liner. 2. F A/EL: Displace Tubing with seawater. Test CIBP Confirm Latch into 3.5" Deployment sleeve. Pull DGLV. Set Circulation 3. S Valve. Pull Same & Set LGLV. 4. F A/SL: Displace IA to diesel. 5. W Pull & Laydown cut liner 6. S Run Caliper Log & GR/CCL. 7. E Set Delta Whipstock 8. V Pre CTD Tree Work �F 3V Rig Work: 1. MIRU and test BOPE. Maximum expected surface pressure with gas (0.10 psi/ft) to surface is 2,418 psi. 2. Mill 3.80"window plus 10' of rathole. Swap the well to 10-10.5 ppg drilling fluid. 3. PU drilling BHA with GR/Resistivity . 4. Drill 4.25" hole to —10,862 MD 5. Run 3-1/4" L-80 liner. 6. Drill 3.25" hole to —13,590' MD 7. Run 2-3/8" L-80 Liner 8. Pump primary cement bringing TOC to TOL, 20 bbls of 15.3 ppg liner cmt planned* 9. Test liner lap to 2,400 psi. 10. Freeze protect well, RDMO Post Rig: 1. V:Tree work as necessary 2. S: Install LTP (if necessary). Install live GLVs. 3. F: Pressure test LTP(if set) 4. Perforate *Approved alternate plug placement per 20 AAC 25.112(i) Ryan Ciolkosz CTD Engineer 564-5977 CC: Well File Joe Lastufka !NEE= 5"X7'L FMC 120 . I STY NOTES:WELL ANGLE>-70°@ 11576' Wt3LHEAD= GRAY O�J 4 f ,••4-1/2"CHROME TBG"' ACTUATOR= BAKER C r ik OKB.REV= 58' RE=BEV= 58' BF.EEEV 29.72' 20'GOND, — 110' \ / _ 23' —5-112"x 4-1/2'XO KOP= 210(7 91,5#,H-40, Max Angle 93 (fp 12086' CI=19.124' • • 2077 -I 4-1/7 HES X NP,D=3.813' Datum MD= 11338' Datum TVD_ 8800'SS GAS LFT MANDRELS ST PA) TVD DEV TYPE VLV LATCH FORT DATE F3--3/8"CSG,72#,L-80,D=12.347" 1-- �255x' 4 3320 3135 44 WAG DAY FK 0 05/04/16 3 5721 4878 48 WAG DMY RK 0 05/04/16 2 8273 6491 45 MMG DMY RK 0 10/30/06 1 10121 7861 41 MAG DMY Fa( 0 10/30/06 ' , — 10328' —4-112"I IM X NP,D=3.813' Minimum ID =2.372" a@ 10534' J 3-1/2" X 2-718" XO ® xj—I 10359' 1—9-5/8"X 4-1/2'BKR S-3 PKR,D=3.870' 10393' 1_42'I ' )=3813' ______-- 10459' H 5-1/2"TBG STUB(TAGGED 10/26/06) 10494' —5-1/2 BAKER PBR ASSY 4-1/2 TBG, 12.64,13CR-80 VAM TOP, — 10484' 1--- , 0152 bpf,D=3.958' 10509' —9-5/8'X 5-117 BAKER SAB PKR 5-1/2'TBG, 174,L-80_0232 bpf,D=4.892" —I 10520' —1 / 10520' —5-1/2"X 4-1/2'XO TOP OF 2-7/8'LNR 10530' II i 10530' 1—3-1/2'BKR DEPLOY Mt3YT SLV,D=3.0" 1 TOP OF 7'LNR 10574' 10534' 1—3-1/2"X 2-7/8"XO, D=2.372" 1 ' 10580' —4-1/2 CA MCO DB-6 LA NDtNG NP, D=3.813"(BEHIND PIPE) / 10692' --4-1/2 BAKER SHEA ROUT SUB(BEHIND LNR) 4-1/2'TBG, 12.6#,L-80,.0152 bpf,0=3.958' — 10594' 10593' — 4-1/2"TBG TAU(BEHIND LNR) 9-5/8"CSG,47#,L 80/500-95,D=8.681" H 10862' I\i 10580' 1— 13M0 TT LOGGED 09/08/86 TOP OF C MNT(12/27/02) — 10880' IlL [r LNR 29#,L-80,.0371 bpi,D=6.184' — 11138' '' '''' MLL©UT WINDOW: 11132'-11139' � •4 •,•• • RERFORA TION SU/MARY .0�0.• 11823'CTM —1142 D.MAGE(06/10/14) REF LOG MAD GR ON 03/23/98 ANGLE AT TOP RIFF:52° 1148(7 Note:Refer to Production DB for historical perf data 12180' --IMP(02/11/03) / SIZE SPF I'TH VAL Opn/Sgz SHOT SQZ /`4414 2" 4 11480-11500 0 03/17/02 ` 1-11/16' 4 11700-11850 0 03/31/98 1-11/16" 4 11900- 12150 0 03/31/98 PBTO —1 13114' , W 1-11/16" 4 12200-12350 C 03/31/98 1-11/16' 4 12450- 12700 C 03/31/98 1-11/16' 4 12900- 13112 C 03/30/98 2-7/8'LNR,6.5#,FL4S,.00579 bpf,D=2,441" , 13146' TD — 13150' DATE REV BY C O..E NTS DATE REV BY COMMENTS TS PRLO-K)E BAY LINT 04/23/83 ORIGINAL COMPLETION 04/01/15 SVVCJJMI)GLV 00(03/26/15) VVF1L: 07-19A 04/01/98 'SIDETRACK 04/20/15 DLJ/JM) TREE 00(04/11/15) PERfu1T No: 1980290 11/03/06 D16 MVO 04/20/15 JLS/JMD GLV 00(04/13/15) AR No: 50-029-20887-01 0228/13 AO WBS CORRECTIONS 05/09/16 JGUJMD GLV 00(05/04/16) SEC 34,T11 N,R14E, 1479'FNL&608'FWL 06/20/14 JRP/JMD LNR DAMAGE(06/10/14) 10/03/16.JNJJMD UPDATE)REF&BF ELEV,MOW 09/05/14 AID CSG DEPTH CORRECTION BP Exploration(Alaska) TREE 5"X7"L FMC 120 S NOTES:WELL ANGLE>—70°(11576' ACTUATOR= BAKER C O —19 B Proposed I *** f2"CHROME TBG"** OKB.REV= 58' BE EEV= / /__ KOP= _2100'. 20"COND, - 110' 23' —I5 1/2"X 4-112"XO Max Angle= 93°t1 12086' 91.5#,1+40, Datum MD= 11338 2072' D= ' Datum TVD-=_,-- 8800'SS D=19.124" - GAS UFT MANDRELS ST MD ND DEV TYPE VLV LATCH FORT DATE 13-3/8"CSG,72#,L-80,D=12.347" H 2556' 4 3320 3135 44 MMG DMY RK 0 05/04/16 3 5721 4878 48 Mt/IG DMY RK 0 05/04/16 Minimum ID =2.372" @ 10534' 2 8273 6491 45 MMG DMY RK 0 10/30/06 3-1/2" X 2-7/8" XO 1 10121 7861 41 MMG DMY RK 0 10/30/06 PERFORATION SUMMARY I 10328' —14-1/2"FES X NP,ID=3.813' REF LOG:MWD GR ON 03/23/98 ANGLE AT TOP PERF_52"@ 11480' Note:Refer to Production DB for historical pert data >< 10359' H 9-5/8"X 4-1/2"BKR S-3 PKR,D=3.870" SIZE SPF NTERVAL Opn/Sqz SHOT SQL 2" 4 11480-11500 0 03/17/02 1-11/16" 4 11700-11850 0 03/31/98 ' 10393' H4-1/2"FES X NP,D=3.813' 1-11/16" 4 11900-12150 0 03/31/98 1-11/16" 4 12200-12350 C 03/31/98 10439' —3.70" BKR DEPLOY SLV,D=3.00" 1-11/16" 4 12450-12700 C 03/31/98 1-11t16 4 12900-13112 C 03/30/98 4 . —1 10449' —13.00" BKR DEPLOY SLV,ID=225" 11 C 4-1/2"TBG,12.6#,13CR-80 VAM TOP, -I 10484' X \ 10459' H5-1/2"TBG STUB(TAGGED 10126/06) .0152 bpf,ID=3.958" �, 4,: 10494' -{5-1/2 BAKER PBR ASSY 5-1/2"TBG,17#,L-80,.0232 bpf,D=4.892" 1-1 10520' • ,,> 10509' —19-5/8"X 5-1/2"BAKER SAB PKR TOP OF 2-7/8"LNR —0530' 1 ' 10520' H 5-1/2"X 4-1/2"XO 10580' —4-1/2 CA MCO DB-6 LANDING NP, TOP OF 7"LNR f 10574' `; �3.813"(BEHIND PIPE) r+ 10580' —{3.70" BKR DEPLOY SLV,D=3.00" r �� 10692' —4-1/2 BAKER SHEA ROUT SUB(BEHIND LNR) 10593L1-1 4-1/2"TBG TAL(BEHIND LNR) 4-112"TBG,12.6#,L-80,.0152 bpf,D=3.958" — 10594' __/ ? \/ B 10580' —� MD TT LOGGED 09108/86 3-1/2"9.2#STL L-80 — 10640' ) 3-1/4"6.44 3-3/16"TCII L-80 H 10808' 7"X 4-1/2"BKR WHIPSTOCK - iH 10640' N► . 9-5/8"CSG,474/,L-80/500-95,D=8.681" — 10862' II 'D HRA Tag — a. • TOP OF CEMENT(12/27/02) — 10880' ;V, 't.v.1 .11. .� a 7"LNR,29#,L-80,.0371 bpf,D=6.184" — 11138' 4.44 0 MIL LO UT WINDOW- 11138' ' —10800 —Ic1E' .,, ' ♦=� 11823'CTM —LNR DAMAGE(06/10/14) IIlip 2-3/8"4-44#Fydril 511 L-80 —1 13590' 12180' —ICEP(02/11/03) PBTD H 13114' I 1.1/4 L2-7/8"LNR 6.5#,FL4S,.00579 bpf,D=2.441" -113148' 1.�/� TD H 13150' DATE REV BY COI0W'fTS DATE REV BY •COMBATS PRUDHOE BAY UNIT 04/23/83 ORIGINAL COMPLETION 04/01/15 SWGJMD GLV GO(03/26/15) _ WELL: 07-19A 04/01/98 SIDETRACK 04/20/15 DU/AD TI'JI GO(04/11/15) R3ZMIT ND: 1980290 11/03/06 D16 RWO 04/20/15 JLS/JMD GLV C/O(04/13/15) AR No: 50-029-20887-01 02/28/13 JMD WBS CORRECTIONS 05/09/16 JGUJMD GLV C/O(05/04/16) SEC 34,T11 N,R14E,1479'FNL&608'FWL 06/20/14 JRP/JMD_LNR DAMAGE(06/10/14) ND09/05/14 D CSG DEPTH CORRECTION BP Exploration(Alaska) tim 1 1 1 1 1 1 1 M' 2 • 0 SQ x f I -, , m :: s g 1:4 \\,,,,„ 1.1 I H y . E T i♦ m i it'...s •• I 1 ,4 ma • I : s I 1 > I il ``• I rrr I g =,,-, 1 Y I I O to I Q H i(13 a ' I O , I „ I Cl V I I II III •• .� 1 OAn� I .1 I LL I 1 Q `` 1 .. 1 Z 1 3 0 , O I = 11 1 I � " ' I a�,,,a,�e seg 1 3m a� �. •I 1 _ 1 i 2 gi 11' II I • I MI i I I__ 1 • I ce U 2 1 1 Ir I \ o W 1 • J f I — i. 1 \ 01 Baa;o' I 111 `): �� �� I I y \ 1 Ce i I e E �. �� 0 I Y 7�0 Tin Y 1 �J «• •: U- Z u V g : m 10:1 ,•: _ \\ m 1 f Nm _ P� v \ 1 \ 5 wil I— _ 3 ) ' I V ..f A I x m • x I m 1 U 1 I � .11110110 . mi 1 ro m ft _ .I 1 0 o — ' x ..�f. . I m • • 1 Z m1 g' I � r_ -+ U z a 1 _ m U I �■^ I Q1B1 x 331 m I E U U 1 x .. '= I I. a s 1 1 2 • 1111 Sundry Application Plug for Re-drill Wells Work Flow This process is used to identify wells that are suspended for a very short time prior to being re- drilled. Those wells that are not re-drilled immediately are identified every 6 months and assigned a current status of"Suspended." Step Task Responsib 1 The initial reviewer will check to ensure that the "Plug for Redrill" box Geologist in the upper left corner of Form 10-403 is checked. If the "Abandon" or "Suspend" boxes are also checked, cross out that erroneous entry and initial it on both copies of the Form 10-403 (AOGCC's and operator's copies). 2 If the "Abandon" box is checked in Box 15 (Well Status after proposed Geologist work) the initial reviewer will cross out that erroneous entry and initial then V it on both copies of the Form 10-403 (AOGCC's and operator's copies). Instead, check the "Suspended" box and initial that change. Drilling Engineer The drilling engineers will serve as quality control for steps 1 and 2. (QC) 3 When the Stat Tech receives a Form 10-403 with a check in the "Plug Stat Tech for Redrill" box, she will enter the Typ_Work code "IPBRD" into the History tab for the well in RBDMS. This code automatically generates a comment in the well history that states "Intent: Plug for Redrill." 4 When the Stat Tech receives any Form 10-407, she will check the Stat Tech History tab in RBDMS for the "Intent: Plug for Redrill" code (IPBRD). If present and there is no evidence that a subsequent re-drill has been COMPLETED, the Stat Tech will assign a status of SUSPENDED to the well bore in RBDMS no matter what status is listed on the 10-407. The Stat Tech will also change the status on the 10-407 form to SUSPENDED, and date and initial this change. If the Stat Tech does not see the "Intent: Plug for Redrill" comment or code, she will enter the status listed on the Form 10-407 into RBDMS. 5 When the Form 10-407 for the redrill is received, the Stat Tech will Stat Tech change the original well's status from SUSPENDED to ABANDONED. 6 The first week of every January and July, the Stat Tech and one of the Stat Tech Geologists will check the "Well by Type Work Outstanding"user query in RBDMS to ensure that all of the Plug for Redrill wells have been Geologist handled properly. At this same time, they will also review the list of suspended wells for accuracy. XHVZE Pages NOT Scanned in this Well History File This page identifies those items that were not scanned during the initial scanning Project. They are available in the original file and viewable by direct inspection. /~/'-- (~) 2~' File Number of Well History File PAGES TO DELETE RESCAN [] Color items - Pages: [] Gmyscale, halftones, pictures, graphs, charts- Pages: [] Poor Quality Original- Pages: [] Other- Pages: DIGITAL DATA [] Diskettes, No. [] Other, No/Type OVERSIZED Logs of various kinds Other Complete COMMENTS: Scanned by; Bevedy Mildred Daretha~~owell TO RE-SCAN Notes: Re-Scanned by: Bevedy Mildred Daretha Nathan Lowell Date: ~si Schlamberger Alaska Data & Consulting Services 2525 Gambell Street, Suite 400 Anchorage, AK 99503-2838 ATTN: Beth Well Job ~ NO. 5460 Company: State of Alaska Alaska Oil & Gas Cons Comm Attn: Christine Mahnken 333 West 7th Ave, Suite 100 Anchorage, AK 99501 Log Description Date BL Color CD 13-35 8148-00084 INJECTION PROFILE - Q~- Z-27 17-09 OS-38 B3S0-00043 BSJN-00031 AYKP-00063 GLS - Q LDL ~ . p PRODUCTION PROFILE - 11/10!09 01/07/10 01/11/10 i 1 1 1 1 1 P2-52 17-09 AGI-Ot B2NJ-00050 AYKP-00064 BBKA-00003 MEMORY XY CALIPER - USIT - ~ USIT ( ) - C 01/21/10 01/24/10 01/22/10 1 1 1 1 1 1 Ot-19B H-13A 07-26 07-19A 2-14/0-16 AWJI-00062 62NJ-00042 BALL-00007 B3S0-00036 AZCM-00050 , MCNL MCNL _ G( RST - RST ~(~ RST b - 01/18/10 12/03/09 11/29/09 12/08!09 12/25/09 1 1 1 1 1 1 1 1 1 P1-24L1 12034915 OH LDWG EDIT (FLEX - Q 12/08/09 1 1 W-217 09AKA0091 OH MWD/LWD EDIT 08/08/08 1 1 W-217 P81 09AKA0091 _ OH MWD/LWO EDIT 11/23/09 11/15/09 2 2 1 1 PLEASE ACKNOWLEDGE REC EIPT BY SIGNIN G AND RETURNING ONE COPY EACH m~ BP Exploration (Alaska) Inc. Alaska Data & Consulting Services . Petrotechnical Data Center LR2-t 2525 Gambell Street, Sude 400 900 E. Benson Blvd. Anchorage, AK 99503-2838 -~~~,~~,j~ F~~ ~. 3 2~1 _~ , ~~~ ~~ ri=~; ~; ~ ?QUO STATE OF ALASKA ALASKA Oil AND GAS CONSERVATION COMMISSION REPORT OF SUNDRY WELL OPERATIQNS . . rJ 1. Operations Performed: Stimulate 0 'Öth~iB Abandon 0 Repair Well[&) Plug PerforationsD Alter CasingD Pull TubingŒ] Perforate New PoolO WaiverD Time ExtensionD Change Approved ProgramD Operation ShutdownD Perforate 0 Re-enter Suspended WellD 2. Operator BP Exploration (Alaska), Inc. 4. Current Well Class: 5. Permit to Drill Number: Name: Development Œ1 ExploratoryD ;I 3. Address: P.O. Box 196612 6. API Number Anchorage, Ak 99519-6612 StratigraphicO ServiceD 50-029-20887-01-00 7. KB Elevation (ft): 9. Well Name and Number: 58.00 07 -19A 8. Property Designation: 10. Field/Pool(s): ADL-028309 Prudhoe Bay Field / Prudhoe Oil Pool 11. Present Well Condition Summary: Total Depth measured 13150 feet true vertical 9025.0 feet Plugs (measured) CIBP @ 12180 (02/11/2003) Effective Depth measured 12180 feet Junk (measured) None true vertical 9031.0 feet Casing Length Size MD TVD Burst Collapse CONDUCTOR 51 20" 91.5# H-40 28 - 79 28.0 - 79.0 1490 470 SURFACE 2527 13-3/8" 72# L-80 27 - 2556 27.0 - 2527.0 5380 2670 PRODUCTION 10798 9-5/8" 47# L-80/S00-95 25 - 10826 25.0 - 8417.0 6870/8150 4760/5080 LINER 558 7" 29# L-80 10574 - 11132 8214.0 - 8672.0 8160 7020 LINER 6 3-1/2" 8.81# L-80 10529 - 10535 8178.0 - 8183.0 10160 10530 LINER 2613 2-7/8" 6.5# L-80 10535 - 13148 8183.0 - 9025.0 15000 15300 Perforation depth: !;;,;r",b ,. '" ..v }. Ct -;':/'~., ., ''''",", " & Measured depth: 12330-12370,12370-12610,12610-12850,13100-13201 True vertical depth: 8999-9001,9001-9006,9006-9000,8999-9003 Tubing ( size, grade, and measured depth): 4-1/2" 12.6# 13Cr80 VAM TOP @ 21 - 10484 5-1/2" 17# L-80 10494 - 10520 4-1/2" 12.6# L-80 @ 10520 - 10594 , Packers & SSSV (type & measured depth): 9-5/8" Baker S-3 Packer @ 10359 9-5/8" Baker SAB Packer @ 10509 4-1/2" HES X Nipple @ 2072 12. Stimulation or cement squeeze summary: Intervals treated (measured): Treatment descriptions including volumes used and final pressure: RWO completed --- cut & replaced part of TBG with 4-1/2" Chrome TBG. 13 Representative Dailv Averaae Production or Iniection Data Oil-Bbl Gas-Mef Water-Bbl Casing Pressure Tubing Pressure Prior to well operation: 724 21749 70 --- 1073 Subsequent to operation: 1985 8672 415 --- 221 14. Attachments: 15. Well Class after proposed work: ExploratoryD Developmentl!! ServiceD Copies of Logs and Surveys run _ 16. Well Status after proposed work: Daily Report of Well Operations _ ~ OilŒJ GasD WAG 0 GINJD WINJD WDSPLD Prepared by DeWayne R. Schnorr (907) 564-5174. 17. I hereby certify that the foregoing is true and correct to the best of my knowledge. SUndry Number or N/A if C.O. Exempt: Contact DeWayne R. Schnorr N/A Printed Name DeWayne R. Schnorr ~ Title Petroleum Engineer Signature ~.M_. " ./ ~ ..J¿' f} ./ Phone 564-5174 Date 11/9/06 RBDMS 8Fl 1 5 2006 Form 10-404 Revised 4/2004 . . 07-19A DESCRIPTION OF WORK COMPLETED EVENT SUMMARY AWGRS 08/18/2006 TIIIO= 160/610/90. Temp= SI. Bleed WHP's <500 psi (for secure). No AIL to this well (DS 07 AIL header pressure is 2036 psi). Tbg FL @ 270' (6.3 bbls). IA FL @ 1380' (60.4 bbls). Bled lAP from 610 psi to 450 psi in 40 minutes. Monitored WHP's for 30 minutes. lAP increased 10 psi. IA FL rose 102' to 1278' (56 bbls). Final WHP's= 160/460/90. AWGRS 08/19/2006 TIO = SSV/480/90. Temp = SI. No AL. WHPs post lAP bleed (for secure). lAP increased 20 psi, OAP unchanged overnight. AWGRS 08/20/2006 T/I/O=140/470/90. SI. TBG pressure (eval plug, holding). TBG pressure decreased 20 psi in 2 days. lAP decreased 10 psi & OAP decreased 10 psi overnight. AWGRS 08/23/2006 Road & RU For MIT -OA, Bleed OA from 100 psi to 0 psi. AWGRS 08/24/2006 TIIAlOA = 0/475/100 MIT-OA to 2000 psi. PASSED (RWO prep.) Bled OA from 100 psi. to 0 psi., Pressured up OA to 2000 psi with 6.9 bbls. crude @ 50* 1st. Test OA lost 100 psi. in 1 st. 15 min. & lost 10 psi. in 2nd. 15 min., Bled OAP to 0 psi. Final WHP's 0/500/100 AWGRS 08/25/2006 T/IAlOA=S1/550/100 Pre Rig Well head MIT PPPOT-T Passed PPPOT-IC Passed Cycle all LDS on tubing spool and casing spool. Also ran in alignment pin for tubing hanger. Was left backed out. Gray wellhead all have external checks. AWGRS 09/25/2006 TIIIO=220/500/100 CMIT TxlA to 3500 psi, PASSED (RWO screen) - RU to lA, Pump 88 bbls crude down IA to pressure TII to 3600/3500 psi, Start testing, 1 st test lost 60/40 psi in 15 min, Tlllost 40/40 psi in 2nd 15 min, Bump up wi .3 bbl crude, Tlllost 20/50 psi in 15 min, Tlllost 40/30 psi in 2nd 15 min, Carried test to 45 min, Tlllost 20/40 psi in 3rd 15 min, PASSED, OAP constant during testing, Bleed WHP's Final WHP's=450/475/350 AWGRS 09/26/2006 TIIIO= 530170/22. Temp= SI. ALP= No AL to well WHP's, Tbg & fA FL (pre RWO). Tbg FL @ 54' (1.3 bbls). IA FL @ 36' (1.6 bbls). IA has a 3" integral flange. AWGRS 09/2612006 Post CMIT RD AWGRS 10/12/2006 ***WELL SII ON ARRIVAL*** (pre tubing cut - rwo) DRIFT TUBING WI 4.50" CENT TO XO @ 10,500' SLM. TARGET DEPTH 10468' MD. ***NOTIFY PAD OP, NORMALED WELLHEAD, LEFT WELL SII*** AWGRS 10/13/2006 ***WELL SII ON ARRIVAL*** (RWO prep) TAG 4.5" WRP @ 10,511' SLM WI 3.5" DUMP BAILER, DUMPED 1 BAG OF SLUGGITS. AWGRS 10/14/2006 DUMPED 2 BAGS OF SLUGGITS (100LBS) DRIFT TBG WI 4.50" CENT TAG X/O @ 10,498' SLM ***NOTIFY DSO, LEFT WELL SII*** NOTE: 4.5" WRP STILL IN HOLE WITH 3 BAGS (150LBS) OF SLUGGITS ON TOP AWGRS 10/16/2006 NOTIFIED DSO UPON ARRIVAL. SPOT EQUIPMENT, HELD PJSM AND RU. WELL SI ON ARRIVAL. RIH WITH 4.15" POWER CUTTER. NO PROBLEMS ENCOUNTERED. TIE IN TO GLM # 10 AND #11. CUT 5.5" TUBING AT 10468', MID JOINT ABOVE THE PACKER WITH 4.15" POWER CUTTER COOH. RD. TOOL STRING OM AND NORMAL AFTER CUT. SWI. NOTIFIED DSO UPON DEPARTURE. Page 1 . . 07-19A DESCRIPTION OF WORK COMPLETED AWGRS 10/19/2006 TIIIO=600/625/150 Circ Well. (Rig prep) - Pumped 5 bbls methanol, 1107 bbls seawater & 169 bbls diesel down tubing taking returns up IA to flowline through Casasco jumper loop, U-tube TxlA to put FP in place, FP FL, Bleed WHP's Final WHP's=OIOIO AWGRS 10/19/2006 Circ out well. No Jumper line on well, Diverted to 14-31 to test plug, Job postponed AWGRS 10/21/2006 SET BPV I PRE RIG DIMS 10/22/2006 RDMO Y-21 A, MIRU 7-19A DIMS 10/23/2006 MfRU on 7-19A DIMS 10/24/2006 Test BOPE, Lay Down 51/2" Tubing. DIMS 10/25/2006 UD Tubing, MIU Reverse Basket BHA, RfH Picking Up 4" DP, Circulate Sweep, POOH, Set RTTS. DIMS 1 0/2612006 DIMS 10/27/2006 DIMS 1 0/28/2006 DIMS 1 0/29/2006 AWGRS 10/29/2006 NID BOPE, CIO Tbg Spool and 9 5/8"Packoff, MIU Reverse Basket and RIH, POOH RIH and Clean Out to WRP, POOH, RIH and Pull WRP, UD 4" DP UD 4" Drill Pipe, UD BHA and WRP, R/U and Run 41/2" Tbg. Run and Land 41/2" Tbg, Reverse in Inhibited Fluid, Set PKR, Unable to Test Tbg, R/U SWS Slickline. ***RIG JOB ON DOYON 16*** RIH W/3.6" BELL GUIDE W/2" SB TO CHASE BALUROD ASSY DOWNHOLE DIMS 10/30/2006 Set X-Plug with Slickline, Test PKR, NID BOPE, NIU Tree, Pump Diesel Freeze Protect. DIMS 10/31/2006 U-Tube Freeze Protect, Set BPV, Secure Well AWGRS 11/04/2006 *** WELL SHUT IN ON ARRIVAL *** (set generic glv's I post rwo) PULLED BPV, RIG UP SLlCKLlNE PULLED STA#2 DGLV @ 5723' SLM (RK LATCH) AWGRS 11/05/2006 (post rwo/set generics) PULLED STA #1 DCR SHEAR VALVE (RKP LATCH) SET 1/4" DOME GLV IN STA #1 @ 3317' SLM SET 5/16" S/O GLV IN STA #2 @ 5718' SLM PULL 4 1/2" XX TTP FROM 10320' SLM PULLED B&R & RHC PLUG BODY FROM 10390' SLM ***WELL LEFT SII, TURNED OVER TO DSO*** Page 2 . . Legal Well Name: Common Well Name: Event Name: Contractor Name: Rig Name: 07-19 07-19 WORKOVER DOYON DRILLING INC. DOYON 16 Start: Rig Release: Rig Number: Spud Date: 1/11/1983 End: 1 0/21/2006 10/21/2006 10/22/2006 03:00 - 04:00 1.00 MOB P 04:00 - 09:00 5.00 MOB P 09:00 - 09:30 0.50 MOB P 09:30 - 13:00 3.50 MOB P 13:00 - 15:00 2.00 MOB P 15:00 - 18:30 3.50 MOB P 18:30 - 19:00 0.50 MOB P 19:00 - 00:00 5.00 MOB P 10/23/2006 00:00 - 03:30 3.50 MOB P 03:30 - 05:00 1.50 MOB P 05:00 - 05:30 0.50 MOB P 05:30 - 08:00 2.50 MOB P 08:00 - 09:00 1.00 MOB P 09:00 - 10:00 1.00 MOB P 10:00 - 12:00 2.00 MOB P 12:00 - 13:00 1.00 CLEAN P 13:00 - 13:30 0.50 CLEAN P 13:30 - 14:30 1.00 CLEAN P 14:30 - 15:00 0.50 CLEAN P 15:00 - 17:00 2.00 CLEAN P 17:00 - 18:30 1.50 CLEAN P 18:30 - 19:30 1.00 CLEAN P 19:30 - 21:00 1.50 CLEAN P 21 :00 - 00:00 3.00 CLEAN P 10/24/2006 00:00 - 00:30 0.50 BOPSU P 00:30 - 01 :00 0.50 BOPSU P 01 :00 - 10:00 9.00 BOPSU P PRE PRE PRE PRE PRE PRE PRE PRE PRE PRE PRE PRE PRE PRE PRE CLEAN CLEAN CLEAN CLEAN CLEAN CLEAN CLEAN CLEAN CLEAN DECOMP DECOMP DECOMP Move Rig Off Well Y-21 A, Spot to UD Derrick. Set BOPE on Stand, Install Front and Rear Booster Wheels, C/O ODS and DS Tugger Cable, Bridle Up Derrick,Prepare to UD Derrick. UD Derrick, Secure to Derrick Stand. Wait On Securitly, Prepare Rig for Road Move. Inspect and Service Sheaves in Derrick. Clean Around Well Y-21A. Move Rig From V-Pad to H-Pad, Hinge Broke on Drillers Side Rear Tires. Repair Hinge. Service Hinge, Wait on Security. Move Rig to D.S.7-19. Moving to D.S. 7-19. Pull Onto Pad Spot to Raise Derrick. RlU to Raise Derrick, Remove Booster Wheels, Install BOPs in Cellar. Raise Derrick and Pin. Set Tuggers, and Pipe Shed Chute, RlU Mud Manifold, and Rig Floor, Double Mat Around Well DS 7-19A MIRU on 7-19A. Spot over Well. MIRU Pump Module, and #4 Motor, Bridle Down. Install Secondary Annulus Valve, Take On 120 deg Sea Water. Rig Up On Production Tree. RlU Lines, Mix Sweep. Pre-Spud Meeting On Rig. Rig up DSM Lubricator, Pull BPV, RID DSM. RlU to Circulate Out Freeze Protection. RlU to Bleed Off OA to Slop Tank. Test Lines to 3,500 psi, Displace Diesel Out of Tubing @ 8 bpm w/61 0 psi. Pump 40 bbl Hi-Vis / Safe Surf-O Sweep Followed by 120 deg Sea Water @ 8 bpm w/61 0 psi. B/D and RID Lines and RlU DSM, Set TWC, RID DSM, Dry Rod In Test Dart. Test TWC to 3,500 psi f/Above and 1,000 psi f/ Below, B/D RID Lines. N/D Adapter Flange and Production Tree. Clear and Clean Cellar Area, N/U BOPE. Continue to Nipple Up BOPE P/U, RlU Test Joint and Test Equipment. Test BOPE to 250 psi Low Pressure and 3,500 psi High Pressure. Each Test was Held for 5 Minutes. AOGCC Witness of Test was Waived by Jeff Jones. Test was Witnessed by the Doyon Toolpusher and BP WSL. Test #1- Annular 4" Pipe, HCR Kill, HCR Choke, Dart Valve Test #2- Manual Choke and Kill, Floor Valve. Test #3- Choke Valves 1,12,13,14. Test #4- Choke Valves 9,11, Upper IBOP. Test #5- Choke Valves 5,8,10. Test #6- Choke Valves 4,6,7, Blinds. Test #7- 4" VBRs. Test #8- 5.5" VBRs. Test #9- Choke Valve #2, Annular 5.5" pipe. Test #10- Choke Valve #3, Annular 4.5" pipe. Test #11- 4.5" VBRs. Printed: 11/612006 8:02:42 AM . . Legal Well Name: Common Well Name: Event Name: Contractor Name: Rig Name: 07-19 07-19 WORKOVER DOYON DRILLING INC. DOYON 16 Start: Rig Release: Rig Number: 1 0/21 12006 1 0/21 12006 Spud Date: 1/11/1983 End: 10:00 - 10:30 DECOMP RID BOPE Test Equipment. 10:30 - 11 :00 DECOMP Cameron Wellhead Rep Pulled Test Dart out of TWC with Dry Rod. 11 :00 - 12:00 1.00 WHSUR P DECOMP RlU DSM Lubricator and Extension, Pull TWC, UD Lubricator and Extension. 12:00 - 13:00 1.00 PULL P DECOMP M/U Landing Joint, Screw into Hanger, Back Out Lock Down Screws, Tubing String Weight in Seawater 160,000#, Tubing Pulled Free at 300,000#. Pulled Hanger to Rig Floor, UD Hanger. 13:00 - 14:00 1.00 PULL P DECOMP RlU Circulating Head and Circulate Bottoms Up, 960 psi at 10 bpm. 14:00 - 16:30 2.50 PULL P DECOMP POOH Laying Down 51/2",17#, L-80, LTC Tubing and Control Line. UD SSSV, Recovered 27 Clamps and 1 Stainless Steel Band. RID Control Line Spooler. 16:30 - 00:00 7.50 PULL P DECOMP POOH Laying Down 5 1/2",17#, L-80, LTC Tubing to 900' 10/25/2006 00:00 - 01 :00 1.00 PULL P DECOMP POOH Laying Down 51/2",17#, L-80, LTC Tubing. Recovered 256 Joints of 5 1/2" Tbg, 11 GLM's and 18.70' Cut Joint. The Jet Cut was Flared Out All the Way Around Approximately 1". Tubing Was in Good Condition With Some Corrosion on the Inside. With a Coating of Parifin on the Last 30 Joints. 01 :00 - 02:00 1.00 PULL P DECOMP RID Tubing Handling Equipment, Clean and Clear Rig Floor. 02:00 - 02:30 0.50 CLEAN P CLEAN M/U Running Tool and Install Wear Bushing. 02:30 - 05:00 2.50 CLEAN P CLEAN P/U BHA #1, Reverse Circulating Junk Basket, Bit Sub, 2 x Joints 2 7/8" PAC DP, XO, Junk Sub, 95/8" Csg Scraper, XO, Bumper Sub, Oil Jar, Pump Out Sub, XO, 6 x 4 3/4" DC's. Total BHA = 290.77'. 05:00 - 15:30 10.50 CLEAN P CLEAN RIH with BHA #1, Picking Up 4" Drill Pipe to 10,451'. 15:30 - 16:30 1.00 CLEAN P CLEAN Establish Parameters, Up Weight 190,000#, Down Weight 140,000#, Rotating Weight 162,000#, 5,000 ft/lbs of Torque at 25 rpm. 1,900 psi at 7 bpm. Wash Down and Tag Top of Tubing Stub at 10,459' Drill Pipe Measurement, Tag Sluggets at 10,507'. Work Reverse Basket to 10,511'. 16:30 - 18:30 2.00 CLEAN P CLEAN Pump 40 bbl High Vis Sweep at 7.5 bpm with 2,100 psi Pump Pressure. Drop Dart and Open Circ Sub. Pump Sweep out of Hole at 10 bpm with 2,600 psi. 18:30 - 20:00 1.50 CLEAN P CLEAN Blow Down Top Drive, RlU and Test Casing to 3,500 psi for 30 Minutes, Good Test. 20:00 - 22:30 2.50 CLEAN P CLEAN POOH, Standing Back 4" Drill Pipe to 3,069' 22:30 - 23:30 1.00 CLEAN P CLEAN M/U HES 9 5/8" Storm Packer and Set Storm Packer at 102' 23:30 - 00:00 0.50 CLEAN P CLEAN Pressure Test HES 95/8" Storm Packer to 2,000 psi for 15 Minutes. Good Test. 1 0/26/2006 00:00 - 01 :00 1.00 WHSUR P CLEAN Blow Down Choke, Kill and Hole Fill Lines, Drain BOP Stack, Pull Riser and N/D and Stand Back BOP Stack. 01 :00 - 02:30 1.50 WHSUR P CLEAN NID 135/8" Gray Gen III Tubing Spool and Gray Primary Packoff. 02:30 - 06:00 3.50 WHSUR P CLEAN Clean and Inspect Lower Spool, Install Gray 9 5/8" Packoff and Gray 135/8" Gen III Tubing Spool. Test Packoff to 3,800 psi for 30 Minutes. Good Test. 06:00 - 10:00 4.00 BOPSU P CLEAN N/U BOP Stack, Install Riser. 10:00 - 11 :00 1.00 BOPSU P CLEAN RlU and Test Wellhead Connection to 250 psi Low Pressure and 3,500 psi High Pressure. Hold Each Test for 5 Minutes. Printed: 11/6/2006 8:02:42 AM . . Legal Well Name: Common Well Name: Event Name: Contractor Name: Rig Name: 07-19 07-19 WORKOVER DOYON DRILLING INC. DOYON 16 Start: Rig Release: Rig Number: Spud Date: 1/11/1983 End: 1 0/21 12006 1 0/21 12006 Good Test. Install Wear Bushing. Release and Pull HES 9 5/8" Storm Packer. UD Running Tool and Storm Packer. POOH Standing Back 4" Drill Pipe. Clean Out Reverse Basket and Junk Sub. Recovered Debris from Power Jet Cutter and Sluggit. Clear and Clean Rig Floor. M/U Reverse Basket BHA #2. Reverse Circulating Junk Basket, Bit Sub, 3 x Joints 2 7/8" PAC DP, XC, 7" Boot Basket, XO, Bumper Sub, Oil Jar, Circulating Sub, XC, 6 x 4 3/4" DC's. Total Bha Lenght = 317.71' CLEAN RIH with Reverse Basket BHA #2 to 10,382' CLEAN Establish Parameters, Up Weight 190,000#, Down Weight 140,000#, Rotating Weight 162,000#, 4,500 ft/lbs of Torque at 25 rpm. Wash Down 6 bpm with 1,450 psi. Tag Top of 5 1/2" Tubing Stub at 10,459'. Unable to Enter 5 1/2" Tubing. Rotate Between 5 and 70 rpm and Very Pump Between 0 and 10 bpm. Work Repeatedly. POOH with Reverse Basket BHA Standing Back 4" Drill Pipe. Stand Back BHA. No Recovery in Reverse Basket and Junk Basket. Break Down Reverse Circulating Basket. M/U Reverse Circulating Basket BHA #3. 8 1/8" TSWP Guide Shoe, EXT, EXT, XC, (Reverse Circulating Basket), Shear Guide, 3 x Joints PAC DP, 7" Boot Basket, XC, Bumper Sub, Oil Jar, Circulating Sub, XC, 6 x 4 3/4" DC's. Total BHA = 320.70' CLEAN RIH with BHA #3 on 4" Drill Pipe to 10,450'. CLEAN Establish Parameters, Up Weight 188,000#, Down Weight 140,000#, Rotating Weight 160,000#, 25 rpm with 4,500 ft/lbs of Torque. Work Through Top of 5 1/2" Tubing Stub with No Problems. Tag WRP at 10,515' DP Measurement. Pump 40 bbl High Vis Sweep Through Reverse Basket at 7.5 bpm with 1,510 psi Pump Pressure. Drop Dart and Open Circulating Sub. Circulate Sweep to Surface at 11 bpm with 2,810 psi Pump Pressure. Service Drawworks and Top Drive. Monitor Well, POOH Standing Back 4" Drill Pipe. UD BHA #3, Reverse Basket, TSWP Guide Shoe Assembly. Recovered 16 Pieces of Power Jet Cutter Debris and 1 Piece of Stainless Steel Band. M/U BHA #4, WRP Pulling Assembly. 8 1/8" TSWP Guide Shoe, EXT, (WRP Puling Tool), XO, XC, Shear Guide, 3 x Joints 2 7/8" PAC Drill Pipe, XC, Bit Sub, Bumper Sub, Oil Jar, Circulating Sub, XC, 6 x 43/4" DC's. Total BHA = 313.25' CLEAN RIH with WRP Pulling BHA on 4" Drill Pipe to 10,374'. CLEAN Establish Parameters, Up Weight 185,000#, Down Weight 138,000#, Rotating Weight 160,000#,15 rpm with 3,000 ft/lbs of Torque. Wash to WRP at 10,515'. CLEAN Latch WRP and Pull 5,000# Over Up Weight. Let Rubber Relax. Plug Not Released. Set 5,000# Down on Plug, Fluid Level in BOP Stack Dropped 10', Pulled 5,000# on Plug, Still 13:00 - 14:00 1.00 CLEAN P CLEAN 14:00 - 14:30 0.50 CLEAN P CLEAN 14:30 - 15:30 1.00 CLEAN P CLEAN 15:30 - 18:00 18:00 - 20:00 2.50 CLEAN P 2.00 CLEAN P 20:00 - 23:00 3.00 CLEAN P CLEAN 23:00 - 00:00 1.00 CLEAN P CLEAN 10/27/2006 00:00 - 00:30 0.50 CLEAN P CLEAN 00:30 - 02:00 1.50 CLEAN P CLEAN 02:00 - 05:30 05:30 - 06:30 3.50 CLEAN P 1.00 CLEAN P 06:30 - 07:30 1.00 CLEAN P CLEAN 07:30 - 08:30 1.00 CLEAN P CLEAN 08:30 - 09:00 0.50 CLEAN P CLEAN 09:00 - 14:00 5.00 CLEAN P CLEAN 14:00 - 15:30 1.50 CLEAN P CLEAN 15:30 - 16:30 1.00 CLEAN P CLEAN 16:30 - 19:30 19:30 - 20:00 3.00 CLEAN P 0.50 CLEAN P 20:00 - 21 :00 1.00 CLEAN P Printed: 11/6/2006 8:02:42 AM . . . Legal Well Name: Common Well Name: Event Name: Contractor Name: Rig Name: 07-19 07-19 WORKOVER DOYON DRILLING INC. DOYON 16 Start: Rig Release: Rig Number: Spud Date: 1/11/1983 End: 1 0/21 12006 1 0/21 12006 10/27/2006 20:00 - 21 :00 1.00 CLEAN P CLEAN Not Releasing. Work Plug from 5,000# Down Weight to 15,000# Over. Plug Released. Dragging 10,000# Overpull to Top of 5 1/2" Tubing Stub. Lost Returns. 21 :00 - 21 :30 0.50 CLEAN P CLEAN Line Up and Fill Through Kill Line. Establish Loss Rate. Initial Loss Rate of 300 bpm Slowing to 250 bph. 21 :30 - 00:00 2.50 CLEAN P CLEAN Monitor Well, POOH Laying Down 4" Drill Pipe to 8,935'. Pumping Double Drill Pipe Displacement. 10/28/2006 00:00 - 02:30 2.50 CLEAN P CLEAN POOH Laying Down 4" Drill Pipe. Pumping Double Drill Pipe Displacement. 02:30 - 03:00 0.50 CLEAN P CLEAN Service Top Drive and Drawworks. 03:00 - 03:30 0.50 CLEAN N RREP CLEAN Change Hydraulic Hose on Pipe Skate. 03:30 - 08:00 4.50 CLEAN P CLEAN POOH Laying Down 4" Drill Pipe. Pumping Double Drill Pipe Displacement. 08:00 - 09:30 1.50 CLEAN P CLEAN UD WRP Retrieval BHA and Wireline Retrieval Plug Pulling Tool. Sealing Element on WRP was Worn and Damaged. 09:30 - 10:00 0.50 CLEAN P CLEAN Pull Wear Bushing. 10:00· 13:00 3.00 RUNCO RUNCMP RlU 4 1/2" Tubing Handling Equipment, RlU Compensator and Torque Turn Equipment. 13:00 - 14:00 RUNCMP P/U 4 1/2" Jewelry, When Attempting to Break Out Collar on 4 1/2" Pup Joint on X Nipple, Crushed Pup Joint With Tongs. 14:00 - 17:00 3.00 HMAN RUNCMP Send X-Nipple to HES Shop to Remove Bad Pup Joint and Install New Pup Joint. 17:00 - 00:00 7.00 RUNCMP RIH with 4 1/2" 13Cr80, 12.6#, JFE K-Bear Tubing. Used Jet Lube Seal Guard Pipe Dope and Torque Turned All Connections. Average M/U Torque on K-Bear 4,500 ft/lbs. Pumping 10 bbls of Seawater in Well Every 20 Minutes. 10/29/2006 00:00 - 06:00 RUNCMP RIH with 4 1/2" 13Cr80, 12.6#, JFE K-Bear Tubing to 10,459'. Using Jet Lube Seal Guard Pipe Dope. Torque Turned All Connections. Average M/U Torque on K-Bear 4,500 ft/lbs. Pumping 10 bbls of Seawater in Well Every 20 Minutes. 06:00 - 06:30 0.50 RUNCMP Establish Parameters, 150,000# Up Weight, 115,000# Down Weight. Tag Top of 51/2" Tubing Stub at 10,459' 06:30 - 09:00 2.50 RUNCMP M/U Space Out Pup's, M/U Hanger. Work Into 5 1/2" Tubing. 4 1/2" Tubing Landed at 10,484'. 09:00 - 10:00 1.00 RUNCMP Land Hanger and Run In Lock Down Screws. 10:00 - 10:30 0.50 RUNCMP RlU to Reverse in Inhibited Seawater. 10:30 - 13:30 3.00 RUNCMP Reverse in 500 bbls of Inhibited Seawater, 3 bpm with 0 psi At 170 bbls Pumped Started Getting Partial Returns. 13:30 - 14:00 0.50 RUNCMP Drop 1 7/8" Ball and Rod. RlU to Pump Down Tubing. 14:00 - 15:00 1.00 RUNCMP Pressure Up 3,500 psi on Tubing to Set and Test Packer. Unable to hold 3,500 psi on Tubing, Bleeding Down to 2,200 psi in 5 Minutes. Pressure Up Annulus to 3,500 psi for 5 Minutes. Good Test. Bleed Down Pressure to Insure DCR Valve Does Not Shear. 15:00 - 17:00 2.00 DFAL RUNCMP Dicuss Options with Well Engineer and on Slope Wells Group. RID Circulating Equipment and UD Landing Joint. 17:00 - 18:00 1.00 DFAL RUNCMP N/D Riser Assembly from Top of BOP Stack. 18:00 - 19:30 1.50 DFAL RUNCMP N/U Shooting Flange Onto BOP Stack. 19:30 - 22:00 2.50 DFAL RUNCMP PJSM with SWS. RlU SWS Lubricator, Wireline BOP's, Pump In Sub, and Packoff. RlU Slickline Equipment. 22:00 - 23:00 1.00 DFAL RUNCMP RlU and Test Lubricator and Shooting Flange to 3,500 psi. 23:00 - 00:00 1.00 DFAL RUNCMP RIH with Ball and Rod Latching Tool and Weight Bars to Reseat Weight on Ball and Rod Printed: 11/612006 8:02:42 AM . . . Legal Well Name: Common Well Name: Event Name: Contractor Name: Rig Name: 07-19 07-19 WORKOVER DOYON DRILLING INC. DOYON 16 Start: Rig Release: Rig Number: 10/21/2006 10/21/2006 Spud Date: 1/11/1983 End: Attempt to Test Tubing With Weight on Rod and Ball. Pressured Up to 3,500 psi Bleeding Down to 2,300 psi in 5 Minutes. 00:30 - 01 :00 0.50 DFAL RUNCMP Shear Off Rod and Ball and POOH with Slickline. 01 :00 - 01 :30 0.50 DFAL RUNCMP M/U X Plug and RIH with X Plug. Plug Hung Up in GLM #4 at 3,328'. 01 :30 - 02:00 DFAL RUNCMP Shear Off X Plug and POOH With Running Tool. 02:00 - 03:30 DFAL RUNCMP RIH With X Plug Retrieval Tool. Latch Into X Plug and POOH. 03:30 - 06:00 DFAL RUNCMP Redress X Plug and RIH. X Plug Went Through GLM #4 With No Problems. Set Plug in X Nipple #2 at 10,329', POOH with Running Tool. 06:00 - 07:00 1.00 DFAL RUNCMP Pressure Up on Tubing to 3,500 psi For 30 Minutes. Good Test. Bleed Tubing Pressure to 1,750 psi. 07:00 - 08:00 1.00 DFAL RUNCMP Test 4 1/2" x 9 5/8" Annulus (IA) to 3,500 psi For 30 Minutes. Good Test. Bleed Down Tubing and Shear DCR Valve. Valve Sheared at 1,000 psi. Pump Through DCR Valve Both Directions to Insure It Is Open. 08:00 - 09:00 DFAL RUNCMP RID SWS Slickline Unit, RlU SWS Lubricator, Slickline BOPE, Pump In Sub and Packoff. 09:00 - 11 :00 RUNCMP N/D Shooting Flange. N/U Riser and Set Lubricator Extension. 11 :00 - 13:00 WHDTRE RlU DSM Lubricator and Set Gray 5" Type K BPV. RID Lubricator and Install Test Dart in Gray BPV. 13:00 - 13:30 WHDTRE Test Gray BPV and Test Dart to 1,000 psi From Below and 2,500 psi From Above. Each Test Was Held For 10 Minutes. Good Test. 13:30 - 15:30 WHDTRE Blow Down Lines, Drain BOP Stack, Remove Riser, N/D BOP Stack and Stand Back. 15:30 - 18:00 2.50 WHSUR P WHDTRE Prep Wellhead and N/U Gray Gen 111135/8" x 71/16" Adaptor Flange and Test to 5,000 psi For 30 Minutes. Good Test. 18:00 - 21 :00 3.00 WHSUR P WHDTRE N/U Gray Gen III 7 1/16" x 51/8" Bore Tree. Test Tree to 5,000 psi For 30 Minutes. Good Test. 21 :00 - 22:00 1.00 WHSUR P WHDTRE Pull Test Dart From Gray BPV, RlU DSM Lubricator and Pull Grey BPV. 22:00 - 00:00 2.00 WHSUR P WHDTRE RlU Little Red Services and Pressure Test Lines to 2,500 psi. Pump 145 bbls of 100 Degree Diesel Freeze Protect Down IA Taking Returns Out the Tubing. 2.5 bpm With 350 psi. 10/31/2006 00:00 - 01 :00 1.00 WHSUR P WHDTRE Line Up and U- Tube Diesel Freeze Protect. 01 :00 - 01 :30 0.50 WHSUR P WHDTRE RlU DSM Lubricator and Set Grey 5" Type K BPV. 01 :30 - 02:00 0.50 WHSUR P WHDTRE Pressure Test BPV From Below to 1,000 psi For 10 Minutes. Good Test. RID DSM 02:00 - 03:00 1.00 WHSUR P WHDTRE Remove Seconday Annulus Valve and Secure Well. Rig Released at 03:00 Hours. Printed: 11/6/2006 8:02:42 AM 07-19A (PTD #1980290) Classified as Problem Well ') ) Subject: 07-19A (PTD #1980290) Classified as Problem Well From: "NSU, ADW Well Integrity Engineer" <NSUADWWellIntegrityEngineer@BP.com> Date: Sat, 07 May 2005 14:46:48 -0800 To:; cahalat@BP.com, "GPB, FS3 DS OpsLead" <GPBFS3DSOpsLead@BP.com>, "Rossberg, R Steven" <RossbeRS@BP.com>, ""NSU, ADW Well Operations Supervisor" <NSUADWWellOperationsSupervisor@BP.com>, "GPB, Wells Opt Eng"" <GPI3WellsOptEng@BP .com?, "AQGCC, Jim. Regg (E-mail)" <jim~regg@admin.state.ak. UP,", " "AOGCC Winton Aubert"(E-mail)..<winton_aubei1@admiiI.state.ak.us>. "NSU, ADWWL& COþ1pletion Supervisor" <~~"SUADWWL&CompletìonSupervisor@BP.com>, "OPE, ·Ops Mgr" . <qPBOpsMgr@BP.com>, "GPB, .FSI.Area Mgr" <GPBFS3TL@BP~com> CC: "NSU, ADW Well Integrity Engineer"·<NSUADWWellIntegrityEngineer@BP.com>; ""Reeves,· DQnald F" <ReevesPf@BP.com> All, Well 07-19A (PTD #1980290) has sustained casing pressure on the IA and is classified as a Problem well. TIO's on 05/05/05 were 1050/1280/680. The plan forward for this well is as follows: Obj: Secure TxlA comm 1. DHD: TIFL - FAILED 2. SL: Caliper tubing, set plug in Deployment Sleeve. 3. FB: MIT-T to 2500 psi, LLRT, CMIT TxlA to 2500 psi Attached is a well bore schematic. Please call if you have any questions. «07 -19A.pdf» Joe Anders, P.E. Well Integrity Coordinator, BP Exploration, (Alaska) Inc. Work: 1-907-659-5102 Mobile: 943-1154 Pager: 659-5100, x1154 Email: NSUADWWelllntegrityEngineer@bp.com SCANNED JUL 0 7 ;¿005 Content-Description: 07-19A.pdf Content-Type: application/octet-stream Content-Encoding: base64 1 of 1 5/10/2005 10:15 AM ') ) TREE = GRA Y GEN 3 WB.LHEAD = GRA Y ACTUA TOR = AXELSON KB. ELEV = 58' Bï=. àËV";;; " köp= " Max Ang Ie = DatumMO"; "" Datu m TVO = 07-19A SAFETY NOTES: LDL 2/9/97 INDICATES LEAK @ SSSV NIP. OBSlRUCTlON NOTED 04/13/98 @ 7150' 210d 93 @ 12086' 11338' 8800' SS - 2195' 1- 5-1/2 CAIVCO BALO SSSV NIP, 10 = 4.562" DUMMY SSSV GAS LIFT MANDRELS DEV lYÆ VLV LATCH PORr DATE 40 MVlIG RK 46 MVlIG RK 48 MVlIG RK 41 MVlIG RK 40 MVlIG RK 43 MVlIG RK 43 MVlIG RK 42 MVlIG RK 41 MVlIG RK 38 MVlIG RK 38 MVlIG RKP ST IIIÐ NO 13-3/8" CSG, 72#, L-80, 10 = 12.347" H --.-J ~ 1 3009 2905 2556' 2 5558 4766 3 7590 6021 4 8815 6889 Minimum ID = 2.372" @ 10534' 5 8885 6942 6 9554 7441 3-1/2" X 2-718" XO L 7 9628 7495 8 10018 7783 9 10089 7836 10 10353 8040 11 10427 8098 ~ ~ 10494' 1--1 5-112 BAKffi PBRASSY 1 10509' 1--1 9-518" X 5-1/2" BAKER SAB PKR 1 5-1/2"TBG, 17#, L-80, .0232bpf, 10=4.892" 1-1 10520' 1-1 5-112" X 4-1/2" XO 1 : \ ¡ 10520' 1 TOP OF 4-1 12" lBG 1-1 10520' I TOP OF 2-7/8" LNR 1-1 10530' 10530' 1-1 3-112 SETllNGSLV, D=2.917" 1 ITOPOF7" LNR 1-1 1 0534' 1-1 3-112" X2-7/8"XO, 10=2.372" 1 1 0574' ~ I I I 10580' 1--14-1/2 CAIVCO DB-6 LANDING NIP, D = 3.813" 4-1/2" TBG, 12.6#, L-80, .0152 bpf, 10 = 3.958" 1-1 10594' I 9-518" CSG, 47#, L-80/500-95, 10 = 8.681" 1-1 10826' µ 1 TOPOF CBVlENT 1-1 10994' 1 ~ 10592' H4-1/2 BAKERSH6'\ROUT SUB (B8-IIND LNR) \ 1 10593' 1-1 4-112"lBGTAIL(BEHINDLNR)1 1 1 0580' 1--1 B.IIIÐ TT LOGGED 09/08/86 It. 7"LNR, 29#, L-80, .0371 bpf, 10=6.184" 1-1 I MLLOUTWINDOW: 11138' PffiFORA TION SUMVlARY RB= LOG: MWD GR ON 03123/98 ANGLEA TTOP ÆRF: 52 @ 11480' f\bte: Refer to A'oduction DB for historical perf data SIZE SFF NTffiVAL Opn/Sqz DATE 2" 4 11480 - 11500 0 03/17/02 1-11/16" 4 11700-11850 0 03/31/98 1-11/16" 4 11900-12150 0 03/31/98 1-11/16" 4 12200 - 12350 C 03/31/98 1-11/16" 4 12450 - 12700 C 03/31/98 1-11/16" 4 12900-13112 C 03/30/98 1 12180' H CBP (02/11/03) 1 1 PBTD 1-1 13111' 1 2-7/8" LNR, 6.5#, FL4S, .00579 bpf, 10= 2.441" H 13148' 1 1 TO 1-1 13150' DA 1E REV BY COMWENTS 04123/83 SI5- ORIGINAL COMPLETION 04101/98 SIDETRACK 09/22/01 RNfTP CORREC1l0NS 03117/02 CWSfTLH A 00 ÆRFS 02/11/03 SRBfTLH CBP SET 03117/02 CWSfTLH Aoo ÆRFS DATE REV BY CO Mv1ENTS 09/11/03 CMOITLP ÆRF Ar-.K3LE CORRECTION PRUŒiOE BAY UNIT WB.L: 07-19A ÆRMT No: 1980290 API No: 50-029-20887-01 SEe 34, T11 N, R14E, 1392.53' FEL & 4814.04' HI. BP EXploration (Alaska) STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMMISSION REPORT OF SUNDRY WELL OPERATIONS 1. Operations performed: Operation shutdown_ Stimulate _ Plugging _ Perforate _ SET ClaP Pull tubing_ Alter casing _ Repair well _ Other_X SET ClBP 2. Name of Operator BP Exploration (Alaska), Inc. 3. Address P. O. Box 196612 Anchora~le, AK 99519-6612 4. Location of well at surface 1479' FNL, 4671' FEL, Sec. 34, T11N, R14E, UM At top of productive interval 5130' FNL, 5115' FEL, Sec. 35, T11N, R14E, UM At effective depth 4871' FNL, 449' FEL, Sec. 34, T11N, R14E, UM At total depth 4815' FNL, 1389' FEL, Sec. 34, T11N, R14E, UM 5. Type of Well: Development _X Explorato~__ Stratigraphic_ Service__ (asp's 676816, 594946(~ (asp's 681744, 5945925) (asp's 681124, 5946170) (asp's 680183, 5946203) 6. Datum elevation (DF or KB feet) RKB 58 feet 7. Unit or Property name Prudhoe Bay Unit 8. Well number 07-19A 9. Permit number / approval number 198-029 10. APl number 50-029-20887-01 11. Field/Pool Prudhoe Bay Oil Pool 12. Present well condition summary Total depth: measured true vertical 13150 feet Plugs (measured) 9025 feet Set CIBP @ 12180' (02/11/2003) Effective depth: measured 12180 feet Junk (measured) true vertical 9031 feet Casing Length Size Cemented Measured Depth True Vertical Depth Conductor 79' 20" 1900 # Poleset 107' 107' 2030 sx Fondu & 400 sx Surface 2528' 13-3/8" 2556' 2556' Permafrost 'C' 500 sx Class 'G' & 300 Intermediate 10798' 9-5/8" 10826' 8417' sx Permafrost 'C' Liner 558' 7" 325 sx Class 'G' 10574' - 11132' 8214' - 8672' Sidetrack Liner 6' 3-1/2" 23 bbls Class 'G' 10529' - 10535' Sidetrack Liner 2613' 2-7/8" 23 bbls Class 'G' 10535-13148' . ~18~' Perforation depth: measured Open Perfs 11480'-11500', 11700'-11850', 11900'-12150', Open Perfs below CIBP 12200'-12350', 12450'-12700', 12900'-13112' true vertical Open Peals 8965'-8978', 9030'-9031', 9033'-9032', Open Peals below ClBP 9030'-9028', 9031'-9023', 9019'-9024' Tubing (size, grade, and measured depth) 5-1/2", 17¢, L-80, TBG ~ 10494'. 5-1/2" x4-1/2" XO ~ 10520'. 4-1/2" 12.6¢~ ~ 10580'. Packers & SSSV (type & measured depth) 5-1/2" BKR PBR ASSY @ 10494'. 9-5/8" x 5-1/2" BKR SAB PKR @ 10509'. 5-1/2" Camco BaI-O SSSV Nipple @ 2195'. 13. Stimulation or cement squeeze summary Intervals treated (measured) (see attached) Treatment description including volumes used and final pressure 14. OiI-Bbl Prior to well operation 02/04/2003 994 Subsequent to operation 02/20/2003 919 Representative Daily Averaqe Production orlniection Data Gas-Mcf Water-Bbl 25242 340 13490 586 Casing Pressure Tubing Pressure 976 966 15. Attachments Copies of Logs and Surveys run __ Daily Report of Well Operations _ 16. Status of well classification as: Oil _X Gas _ Suspended __ Service DeWayne R. Schnorr BFL Form 10-404 Rev 06/15/88 · 17. I hereby certify that the foregoing is true and correct to the best of my knowledge_. SCANNED ~AR n ? ?003 Title: Techical Assistant Date February 25, 2003 Prepared by DeWayne R. Schnorr 564-5174 [ i , ~ . ¢,.'¢ ~" i / .... SUBMIT IN DUPLICATE 12/25/2002 12/26/2002 12/27/2002 12/27/2002 02/08/2003 02/09/2003 02/11/2003 02/21/2003 12/25/O2 12/26/02 1 2/27/02 12/27/O2 02/0~03 02/09/03 02/11/03 07-19A DESCRIPTION OF WORK COMPLETED NRWO OPERATIONS PACKERS/BRIDGE PACKERS/BRIDG E PACKERS/BRIDGE LOG PACKERS/BRIDGE PACKERS/BRIDGE PACKERS/BRIDGE PLUGS/POGLMS: PLUGS/POGLMS: PLUGS/POGLMS: D RI FF/TAG AC-FLUID LEVEL CHANNEL DETECTION LOG--BORAX PLUGS/POGLMS: PLUGS/POGLMS: PLUGS/POGLMS: CEMENT BOND LOG--SCMT/USIT CAST IRON BRIDGE PLUG CAST IRON BRIDGE PLUG; MILL PACKERS/BRIDGE PLUGS/POGLMS: CAST IRON BRIDGE PLUG TESTEVENT--- BOPD: 964, BWPD: 106, MCFPD: 19,018, AL Rate: 0 EVENT SUMMARY <<< WELL FLOWING ON ARRIVAL >>> DRIFT W/2.287 GAUGE RING TO 11,678' SLM. TOOLS STOPPED DUE TO HAW. <<< POP WELL AS PER DSO TIC= 900/1480/900. TEMP = WARM. CA FL @ 30' (2 BBLS). (CA P > 500 PSI). PUMPED 511 BBLS OF KCL WATER DOWN THE TUBING FOR E-LINE. SLIM CEMENT MAPPING TOOL. LOG REFERENCED TO TOOL SWS MCNL LOG DATED 24-DECEMBER-2001. DID NOT TAG. TOP OF CEMENT 10880'. LOG PASSES PERFORMED WITHOUT PUMPING SUGGEST GAS ENTRY AT 10900'. PAD OPERATOR NOTIFIED TO POP. SET CIBP; MIRU DS CTU #9. RIH WITH PDS MEMORY GR/CCL. LOG 12,300' UP TO 11,500' CTMD. FLAGGED PIPE @ 12,200' CTMD. POOH. TIED INTO SWS HEM CNL BORAX LOG DATED 24-DEC-2001. MADE -9' CORRECTION. CORRECTED EOP AT FLAG = 12,181'. RIH WITH 2-7/8" CIBP TO 11,821' CTMD. TAGGED AND UNABLE TO GET DEEPER. POOH FOR MOTOR AND MILL. LD CIBP, PICKED UP MOTOR AND 2.30 JUNK MILL. RIH AND STARTED MILLING @ 11,818'. MILLED TO 11,838' CTMD. TOUGH MILLING (THIS 20' AREA CORRESPONDS WITH ERRATIC CCL ON TIE-IN LOG). CONTINUED MILLING TO 12,250' CTMD WITHOUT ANY RESISTANCE. POOH BACK- REAMING. FP WELL WITH METHANOL. SHUT DOWN OPERATIONS DUE TO HIGH WINDS. STANDBY. AFTER WEATHER STANDBY --- FREEZE PROTECT FLOWLINE WITH 15 BBLS NEAT METHANOL AND 71 BBLS OF 60/40 METHANOL WATER. RIH WITH 2- 7/8" CIBP, SAW SLIGHT WEIGHT DROP IN AREA MILLED (11,820' +). AT FLAG CORRECTED TO CENTER OF CIBP (12,193'). PUH AND SET CIBP @ 12,180'. PUH AND RBIH TO TAG CIBP @ 12183'. POOH. WELL UNABLE TO FLOW ON ITS OWN. PUMPED ADDITIONAL 27 BBLS OF 60/40 METHANOL WATER DOWN WELL TO ENSURE FREEZE PROTECTED. RD Page1 SCANNED~ ~flAR 0 ? 2_003 07-19A DESCRIPTION OF WORK COMPLETED NRWO OPERATIONS 02/11/03 (continued) DS CTU #9. NOTIFY DSO THAT JOB IS COMPLETED AND WELL IS SHUT-IN. WELL TO BE POP WHEN WEATHER CONDITIONS PERMIT. <<< JOB COMPLETED >>> 02/21/03 TESTEVENT --- BOPD: 964, BWPD: 106, MCFPD: 19,018, AL RATE: 0 FLUIDS PUMPED BBLS 0.5 PRESSURE TEST LUBRICATOR W/1 BBL OF DIESEL, (1 TEST) 65 60/40 METHANOL WATER 10 METHANOL 511 KCL WATER 250 1% KCL WATER 697 EXTRA SLICK KCL WATER 1533.5 TOTAL ,SCANNED NIAR O ? 2003 Page 2 STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMMISSION REPORT OF SUNDRY WELL OPERATIONS 1. Operations performed: Operation shutdown_ Stimulate_ Plugging_ Perforate _X ADD PER ES Pull tubing _ Alter casing _ Repair well _ Other_ 2. Name of Operator 5. Type of Well: 6. Datum elevation (DF or KB feet) BP Exploration (Alaska), Inc. Development__X RKB 58 feet 3. Address Exploratow__ 7. Unit or Property name P. O. Box 196612 Stratigraphic_ Anchorage, AK 99519-6612 Service__ Prudhoe Bay Unit 4. Location of well at surface 8. Well number 1479' FNL, 4671' FEL, Sec. 34, T11 N, R14E, UM (asp's 676816, 5949460) 07-19A At top of productive interval 9. Permit number / approval number 5130' FNL, 5115' FEL, Sec. 35, T11 N, R14E, UM (asp's 681744, 5945925) 198-029 At effective depth 10. APl number 4825' FNL, 1353' FEL, Sec. 34, T11N, R14E, UM (asp's 680219, 5946194) 50-029-20887-01 At total depth 11. Field / Pool 4815' FNL, 1389' FEL, Sec. 34, T11 N, R14E, UM (asp's 680183, 5946203) Prudhoe Bay Oil Pool 12. Present well condition summary Total depth: measured 13150 feet Plugs (measured) true vertical 9025 feet Effective depth: measured 13111 feet Junk (measured) true vertical 9024 feet Casing Length Size Cemented Measured Depth True Vertical Depth Conductor 79' 20" 1900 # Poleset 107' 107' 2030 sx Fondu & 400 sx Surface 2528' 13-3/8" 2556' 2556' Permafrost 'C' 500 sx Class 'G' & 300 Intermediate 10798' 9-5/8" 10826' 8417' sx Permafrost 'C' Liner 558' 7" 325 sx Class 'G' 10574' - 11132' 8214' - 8672' Sidetrack Liner 6' 3-1/2" 23 bbls Class 'G' 10529' - 10535' 8178' - 8183' Sidetrack Liner 2613' 2-7/8" 23 bbls Class 'G' 10535-13148' 8183' - 9025' Perforation depth: measured Open Perfs 11480'-11500', 11700'-11850', 11900'-12150', 12200'-12350', 12450'-12700', Open Perfs (continued) 12900'-13112' true vertical Open Perfs 8965'-8978', 9030'-9031', 9033'-9032', 9030'-9028', 9031'-9023', 9019'-9024' Tubing (size, grade, and measured depth) 5-1/2", 17#, L-80, TBG @ 10494'. 5-1/2" x 4-1/2" XO @ 10520'. 4-1/2" 12.6# TT @ 10580'. Packers & SSSV (type& measured depth) 5-1/2" BKR PBR ASSY @ 10494'. 9-5/8" x 5-1/2" DER SAD PKR 13. Stimulation or cement squeeze summary (measured) (see a~a~hed) Intervals treated Treatment description including volumes used and final pressure 14. Representative Daily Average Production or Iniection OiI-Bbl Gas-Mcr Water-Bbl Casin~ Tubing Pressure Prior to well operation 03/10/2002 Shut-tn Subsequent to operation 03/19/2002 1002 16779 823 317 15. Attachments 16. Status of well classification as: Copies of Logs and Surveys run __ Daily Report of Well Operations __ Oil __X Gas __ Suspended __ Service 17. I hereby certify that the foregoing is true and correct to the best of my knowledge. ,~~----~t~.~,~C~,~ Title: Techical Assistant Date March 20. 2002 DeWayne R. Schnorr Prepared by DeWayne R. Schnorr 564-5174 Form 10-404 Rev 06/15/88 · SUBMIT IN DUPLICATE 07-19A DESCRIPTION OF WORK COMPLETED NRWO OPERATIONS 03/13/2002 PERFORATING: DRIFT/TAG 03/17/2002 PERFORATING: PERFORATING EVENT SUMMARY 03/13/02 DRIFT & TAG W/2.11" X 10' DUMMY GUN. TOOL STOPPED FALLING @ 11620' WLM DUE TO DEVIATION. BOTTOM SHOT TO BE @ 11,500'. ***WELL IS OK TO 03/17/02 RIH WITH 2-IN (4SPF) PJ HSD GUN. TIE INTO SS MWD LOG AND PERF 11480'- 11500'. DEEPEST DEPTH REACHED 11600' DUE TO DEVIATION. WELL WAS SHOT BALANCED. NOTIFIED DSO TO POP WELL. FLUIDS PUMPED BBLS 0 PRESSURE TEST LUBRICATOR W/1 BBL OF DIESEL, (2 TESTS) 0 DIESEL 0 SEA WATER 0 TOTAL ADD PERFS 03/17/2OO2 THE FOLLOWING INTERVAL WAS PERFORATED USING THE 2" PJ 4SPF, RANDOM ORIENTATION. 11480'-11500' Page I Well Compliance Report File on Left side of folder 198-029-0 ...... ----PRuD.~E BAY ~T 0~2i9X .................... 5'02 "0~922088720i ~0 MD 13150 ~ TVD 09025r ~'ompletion Date: 4/1/98 Completed Status: 1-OIL Current: T Name Interval D 8432 ~ SPERRY GR L NGP-MD ,_Y~AL 11090-13148 Sent Received T/C/D OH 5/6/98 5/6/98 OH 5/6/98 5/6/98 L NGP-TVD yAL 8580-8967 OH 5/6/98 5/6/98 R SRVYRPT L~RR~ 11000-13148. OH 4/30/98 5/13/98 Daily Well Ops 5/,~1/~ .... Are Dry Ditch Samples Required? yes ~____~sAnd Re~ye~ Was the well cored? yes ~ Analysis DeeD'es no Comments: Monday, May 01,2000 Page 1 of 1 STATE OF ALASKA ~:~ ...... ALASKA OIL AND GAS CONSERVATION COMMISSION ~". WELL COMPLETION OR RECOMPLETION REPORT AND LOG 1 Status of Well Classification Oil_X Gas. Suspended__ Abandoned__ Service__ 2 Name of Operator 7 Permit Number ARCO Alaska, Inc. 98-29 3 Address 8 APl Number P.O. BOX 100360, Anchorage, AK 99510-0360 50-029-20887-01 4 Location of well at surface :-?';' y'~,i.;;{; 7.-;' ' ' ' : ,~~ 9 Unit or Lease Name 1479' FNL, 608' FWL, Sec 34, T11N, R14E, UM ' ......,. ~/../~,.' :',: · ! ~I -:'""~.'~- PRUDHOE BAY UNIT At To pProducing interval '7~'~/(..~,~, _~ 10 Well Number 149' FSL, 164' FWL, Sec 35, T11N, R14E, UM , ,';,',;¢ .!.d 7-19A 4815' FNL, 1389' FEL, Sec 34, T11N, R14E, UM.. ':,: ..................... PRUDHOE BAY FIELD 5 Elevation in feet (indicate KB, DF, etc.) 6 Lease Designation and Serial No. 58' RKB ADL 28309 PRUDHOE BAY OIL PQOL 12 Date Spudded 13 Date T.D. Reached 14 Date Comp., Susp., or Aband. 15 Water Depth, if offshore 16 No. of Completions 3/23/98 3/28/98 4/1/98 N/A 1 17 Total Depth (MD+TVD) ;18 Plug Back Depth (MD+TVD) 19 Directional Survey 20 Depth where SSSV set 21 Thickness of Permafrost 13150' MD / 9025' TVD 13111' MD/9024' TVD YES_X NO__ 2195' feet MD 1900' (approx) 22 Type Electric or Other Logs Run MWD & GR. 23 CASING, LINER AND CEMENTING RECORD SETTING DEPTH CASING SIZE WT. PER FT. GRADE TOP Bo'FrOM HOLE SIZE CEMENTING RECORD AMT PULLED 20" 91.5# H-40 Surf 79' 30" 1900# Poleset 13-3/8" 72# L-80 Surf 2556' 17.5" 2030 Sx Fondu & 400 Sx Permafrost C 9-5/8" 47# L-80/S00-95 Surf 10826' 12.25" 500 Sx Class G & 300 Sx Permafrost C 7" 29# L-80 10574' 11132' 8.5" 325 Sx Class G 3-1/2" 8.81 # L-80 10529' 10535' 3.75" 23 bbls Class G 2-7/8" 6.5# L-80 10535' 13148' 3.75 ......... 24 Perforations open to Production (MD+TVD of Top and Bottom and 25 TUBING RECORD interval, size and number) SIZE DEPTH SET MD PACKER MD 5-1/2" Tbg 10520' 10509' 11700' - 11850' MD; 9030' - 9031' TVD; @ 4 spf. 4-1/2" Tbg 10594' 11900' - 12150' MD; 9033' - 9032' TVD; @ 4 spf. 12200' - 12350' MD; 9030' - 9028' TVD; @ 4 spf. 26 ACID, FRACTURE, CEMENT SQUEEZE, ETC. 12450' - 12700' MD; 9031' - 9023' TVD; @ 4 spf. DEPTH INTERVAL MD AMT & KIND MATERIAL USED 12900'- 13112' MD; 9019'-9024'TVD; @4spf. r' "xiGINAL 27 PRODUCTION TEST ; Date First Production Method of Operation (Flowing, gas lift, etc.) ~.~ - 4/5/98 Gas Lift :)ate of Test Hours Tested PRODUCTION FOR OIL - BBL GAS - MCF WATER - BBL CHOKE SIZE I GOR 4/26/98 3.3 TEST PERIOD --I 14348 Flow Tubing Press Casing Pressure CALCULATED OIL - BBL GAS - MCF WATER - BBL OIL GRAVITY - APl (corr) 292 - 24 HOUR RATE _X 176 2525 210 28 CORE DATA Brief description of lithology, porosity, fractures, apparent dips and presence of oil, gas, or water. Submit core chips. · This 10-407 is submitted as directed per the 10-401 form approved 3/3/98 (Permit # 98-29). Form 10-407 Submit in duplicate Rev. 7-1-80 CONTINUED ON REVERSE SIDE NAME Sadlerochit Top (other pics) GEOLOGIC MARKERS MEAS DEPTH 11015' TRUE VERT DEPTH 8574' FORMATION TESTS Include interval tested, pressure data, and fluids recovered and gravity, GOR, and time of each phase. 31 LIST OF ATTACHMENTS Summary of 7-19A CT Sidetrack Drilling Operations + Survey. 321 hereby certify that the foregoing is true and correct to the best of my knowledge Erin Oba Engineering Supervisor Date 5~,2-~ '"' ¢~ INSTRUCTIONS Prepared by Paul Rauf 263-4990 General: This form is designed for submitting a complete and correct well completion report and log on all types of lands and leases. Item 1' Classification of Service Wells: Gas injection, water injection, steam injection, air injection, salt water disposal, water supply for injection, observation, injection for in-situ combustion. Item 5: Indicate which elevation is used as reference (where not otherwise shown) for depth measurements given in other spaces on this form and in any attachments. Item 16 and 24: If this well is completed for separate production from more than one interval (multiple completion), so state in item 16, and in item 24 show the producing intervals for only the interval reported in item 27. Submit a separate form for each additional interval to be separately produced, showing the data pertinent to such interval. Item 21' Indicate whether from ground level (GL) or other elevation (DF, KB, etc.). Item 23: Attached supplemental records for this well should show the details of any multiple stage cementing and the location of the cementing tool. Item 27: Method of operation: Flowing, Gas Lift, Rod Pump, Hydraulic Pump, Submersible, Water Injection Gas Injection, Shut-In, Other-explain. Item 28: If no cores taken, indicate "none". Form 10-407 Rev. 7-1-80 DESCRIPTION OF WORK COMPLETED COILED TUBING SIDETRACK DRILLING OPERATIONS 3/21/98: MIRU CTU. NU BOPE. 3f22/1998: PT BOPE. RIH w/BHA & tagged TOC @ 11994' MD. Milled pilot hole to 11131' MD. POOH w/BHA. 3/23/98 RIH w/BHA & milled a window through the 7" casing from 11132' to 11139' MD. POOH w/BHA. RIH w/BHA. 3/24/98 Drilled ahead to 11143' MD. Dressed window and POOH w/BHA. RIH w/BHA but unable to drift through window. POOH w/BHA. RIH w/BHA and reamed window to 11144' MD. POOH w/BHA. RIH w/BHA & drilled into formation to 11150' MD. Performed LOT to EMW 9.5 ppg. Drilled to 11250' MD. 3/25/98 Drilled to 11256' MD. POOH w/BHA. RIH w/BHA & drilled to 11383' MD w/lost circulation. Drilled to 11413' MD. Pumped LCM pill. Squeezed to 1500#. POOH w/BHA. RIH w/BHA & drilled to 11700' MD. POOH w/ 3/26/98 RIH w/BHA & drilled horizontal section to 11900' MD w/shorf trips to window. Drilled to 11985' MD w/lost circulation. Unable to orient bit so POOH w/BHA. RIH w/BHA & drilled to 12100' MD. 3/27/98 Drilled ahead to 12850' MD w/lost circulation. Pumped several Lo-Vis sweeps. 3/28/98 Drilled to 13150' MD. POOH w/BHA while laying in Hi-Vis pill. 3/29/98 RIH w/2-7/8" liner assembly & landed @ 13150' MD. Displaced 23 bbls Neat Class G cement to set liner from 10529' to 13148' MD. Estimated TOC @ 10807' MD. POOH w/circulating 2% KCL water. WOC. 3/30/98 BOPE test. RIH w/BHA & PT cement to 2000#. C/O liner. Tagged liner landing collar @ 13111' MD. POOH. 3/31/98 RIH w/Perf guns & shot initial perforations at: 11700'-11850' MD 11900'-12150' MD 12200'-12350' MD 12450'-12700' MD 12900'-13112' MD Used 1-11/16" carriers & shot all perfs at 4 spf. POOH w/perf guns. 4/1/98 POOH w/Perf gun. RD & MOL. Placed the well on initial production w/gas lift & obtained a valid well test. 0 I:! I Ll_l I~l G S I~ I::! U I I-- I:=: c:: 30-Apr-98 AOGCC Lori Taylor 3001 Porcupine Drive Anchorage, AK 99501 Re: Distribution of Survey Data for Well 7-19A Dear Lori Taylor: Enclosed are two survey hard copies. Tie-on Survey: Window / Kickoff Survey: Projected Survey: 11,000.00' MD 11,132.00' MD 13,148.00' MD (if applicable) Please call me at 563-3256 if you have any questions or concerns. Regards, William T. Allen Survey Manager Attachment(s) 5631 Silverado Way, Suite G · Anchorage, Alaska 99518 · (907) 563-3256 · Fax (907) 563-7252 A Division of Dresser Industries, Inc. Prudhoe Bay Unit Alaska State Plane Zone 4 PBU EOA DS 07 07-19A SURVEY REPORT 26 April, 1998 Your Ref: AP1-500292088701 Last Survey 27-Mar-98 Job Number AKMWS0171 KBE- 58' DRILLING SERVICES ORIGINAL Survey Ref: svy3385 Prudhoe Bay Unit Measured Depth (ft) 11000.00 11132.00 11132.31 11164.34 11200.40 11238.00 11251.00 11275.50 11294.10 11319.60 11339.70 11357.20 11389.10 11408.69 11437.12 11465.69 11491.97 11504.32 11546.77 11576.30 11611.07 11645.42 11671.89 11701.51 11732.24 11774.84 11808.57 11839.29 11878.87 11920.49 33.250 32.512 32.510 28.880 27.600 21.400 20.000 21.800 23.800 26.000 28.600 31.600 37.600 40.100 44.900 49.100 53.690 55.370 64.690 71.190 79.080 82.880 85.960 90.090 91.230 90.350 88.500 87.450 88.280 88.150 134.000 134.628 134.630 160.800 174.990 192.090 200.470 216.040 226.420 238.500 246.580 252.580 261.450 265.830 271.370 276.090 279.900 280.300 283.500 285.600 287.300 294.000 300.000 306.200 310.000 316.200 319.900 319.500 319.500 317.900 Sub-Sea Depth (ft) 8503.34 8614.19 8614.45 8642.12 8673.92 8708.16 8720.32 8743.23 8760.38 8783.52 8801.39 8816.53 8842.80 8858.05 8879.02 8898.50 8914.90 8922.06 8943.25 8964.34 8963.25 8968.64 8971.22 8972.24 8971.88 8971.30 8971.63 8972.72 8974.19 8975.49 Vertical Depth (ft) 8561.34 8672.19 8672.45 8700.12 8731.92 8766.16 8778.32 8801.23 8818.38 8841.52 8859.39 8874.53 8900.80 8916.05 8937.02 8956.50 8972.90 8980.06 9001.25 9012.34 9021.25 9026.64 9029.22 9030.24 9029.88 9029.30 9029.63 9030.72 9032.19 9033.49 Sperry-Sun Drilling Services Survey Report for 07-19A Your Ref: API,500292088701 . Local Coordinates Global Coordinates Dogleg Vertical Northings Eastings Northings Eastings Rate Section (ft) (ft) (ft) (ft) (°/100ft) (ft) 3646.70 S 4828.65 E 5945927.99 N 681729.14 E 5986.67 3696.76 S 4879.93 E 5945879.15 N 681781.58 E 0.616 6058.32 3696.88 S 4880.05 E 5945879.04 N 681781.70 E 0.616 6058.49 3710.29 S 4888.76 E 5945865.83 N 681790.73 E 42.896 6074.16 3726.86 S 4892.35 E 5945849.36 N 681794.71 E 18.914 6088.48 3742.27 S 4891.68 E 5945833.93 N 681794.40 E 24.901 6098.99 3746.68 S 4890.40 E 5945829.50 N 681793.23 E 25.175 6101.23 3754.29 S 4886.26 E 5945821.79 N 681789.26 E 23.755 6103.74 3759.67 S 4881.50 E 5945816.30 N 681784.64 E 24.111 6104.24 3766.14 S 4873.00 E 5945809.63 N 681776.29 E 21.687 6102.88 3770.36 S 4864.83 E 5945805.22 N 681768.22 E 22.497 6100.15 3773.40 S 4856.61 E 5945801.99 N 681760.07 E 24.262 6096.54 3777.35 S 4838.98 E 5945797.62 N 681742.54 E 24.517 6086.99 3778.70 S 4826.78 E 5945795.99 N 681730.37 E 18.956 6079.38 3779.13 S 4807.59 E 5945795.11 N 681711.20 E 21.397 6066.22 3777.74 S 4786.76 E 5945796.01N 681690.35 E 19.022 6050.61 3774.86 S 4766.44E 5945798.41 N 681669.96 E 20.813 6034.30 3773.10 S 4756.54E 5945799.94 N 681660.02 E 13.857 6026.09 3765.48 S 4720.61E 5945806.71N 681623.92 E 22.902 5995.45 3758.60 S 4694.14 E 5945812.97 N 681597.30 E 22.976 5971.96 3749.08 S 4661.94E 5945821.73 N 681564.88 E 23.178 5942.58 3737.11 S 4630.22 E 5945832.94 N 681532.89 E 22.211 5911,80 3725.16 S 4606.76 E 5945844.35 N 681509.16 E 25.381 5886.82 3709.00 S 4581.98 E 5945859.92 N 681484.01 E 25.137 5857.92 3690.05 S 4557.81 E 5945878.30 N 681459.39 E 12.909 5827.45 3660.96 S 4526.72 E 5945906.65 N 681427.63 E 14.698 5784.91 3635.88 S 4504.18 E 5945931.19 N 681404.51 E 12.263 5751.22 3612.46 S 4484.32 E 5945954.14 N 681384.11 E 3.657 5720.61 3582.39 S 4458.63 E 5945983.60 N 681357.72 E 2.097 5681.15 3551.13 S 4431.18 E 5946014.20 N 681329.54 E 3.855 5639.62 Comment 33e-On Survey Window Point Alaska State Plane Zone 4 PBU EOA DS 07 Continued... 26 April, 1998 - 16:54 - 2 - DrillQuest Prudhoe Bay Unit Measured Depth (ft) Incl. 11961.72 12005.92 12048.49 12086.07 12110.49 12138.54 12173.09 12210.24 12246.19 12274.82 12301.54 12335.69 12371.77 12394.62 12427.19 12468.79 12502.47 12537.74 12594.50 12621.64 12661.87 12698.27 12725.74 12753.12 12785.92 12812.39 12848.87 12880.89 12916.17 12946.99 89.750 87.360 90.260 93.060 92.280 92.460 92.370 91.230 92.460 92.550 89.740 88.150 86.480 88.150 90.260 90.620 91.320 91.670 92.300 92.370 92.550 91.490 91.840 92.020 90.790 91.050 90.090 91.410 89.380 87.630 317.500 309.000 307.800 306.300 303.500 302.600 299.700 296.300 295.800 293.300 291.400 288.800 284.500 282.400 281.000 278.000 275.800 272.600 268.400 267.700 265.600 259.100 257.100 253.600 249.700 250.300 257.000 260.600 262.200 267.500 Sub-Sea Depth (ft) 8976.25 8977.36 8978.25 8977.16 8976.O2 8974.86 8973.40 8972.24 8971.08 8969.83 8969.29 8969.92 8971.61 8972.69 8973.14 8972.82 8972.25 8971.33 8969.36 8968.25 8966.53 8965.24 8964.44 8963.52 8962.72 8962.29 8961.93 8961.51 8961.27 8962.O7 Vertical Depth (ft) 9034.25 9035.36 9036.25 9035.16 9034.02 9032.86 9031.40 9030.24 9029.08 9027.83 9027.29 9027.92 9029.61 9030.69 9031.14 9030.82 9030.25 9029.33 9027.36 9026.25 9024.53 9023.24 '9022.44 9021.52 9020.72 9020.29 9019.93 9019.51 9019.27 9020.07 Sperry-Sun Drilling Services Survey Report for 07-19A Your Ref: API-500292088701 Local Coordinates Global Coordinates Dogleg Vertical Northings Eastings Northings Eastings Rate Section (ft) (ft) (ft) (ft) (°/100ft) (ft) 3520.65 S 4403.44 E 5946044.03 N 681301.09 E 4.000 5598.43 3490.40 S 4371.29 E '5946073.51 N 681268.24 E 19.969 5554.32 3463.97 S 4337.94 E 5946099.15 N 681234.27 E 7.372 5512.09 3441.34 S 4307.96 E 5946121.07 N 681203.77 E 8.452 5474.93 3427.38 S 4287.96 E 5946134.55 N 681183.45 E 11.891 5450.95 3412.10 S 4264.46 E 5946149.28 N 681159.60 E 3.269 5423.57 3394.24 S 4234.93 E 5946166.44 N 681129.65 E 8.390 5390.12 3376.81 S 4202.15 E 5946183.09 N 681096.47 E 9.648 5354.70 3361.03 S 4169.86 E 5946198.11 N 681063.83 E 3.693 5320.80 3349.15 S 4143.85 E 5946209.38 N 681037.54 E 8.729 5294.08 3338.99 S 4119.15 E 5946218.95 N 681012.61 E 12.694 5269.50 3327.26 S 4087.08 E 5946229.93 N 680980.28 E 8.923 5238.64 3316.94 S 4052.57 E 5946239.44 N 680945.53 E 12.773 5207.06 3311.63 S 4030.37 E 5946244.22 N 680923.21 E 11.734 5187.70 3305.02 S 3998.48 E 5946250.08 N 680891.18 E 7.774 5160.62 3298.16 S 3957.46 E 5946255.98 N 680850.00 E 7.263 5126.93 3294.11 S 3924.03 E 5946259.23 N 680816.49 E 6.854 5100.59 3291.53 S 3888.87 E 5946260.99 N 680781.28 E 9.124 5074.07 3291.04 S 3832.16 E 5946260.15 N 680724.57 E 7.478 5033.91 3291.96 S 3805.06 E 5946258.59 N 680697.50 E 2.590 5015.55 3294.31 S 3764.93 E 5946255.30 N 680657.45 E 5.234 4989.06 3299.15 S 3728.90 E 5946249.62 N 680621.54E 18.082 4967.21 3304.81 S 3702.03 E 5946243.33 N 680594.81 E 7.388 4952.39 3311.73 S 3675.56 E 5946235.79 N 680568.51 E 12.793 4938.74 3322.05 S 3644.45 E 5946224.74 N 680537.64E 12.464 4924.25 3331.10 S 3619.58 E 5946215.10 N 680512.99 E 2.470 4913.24 3341.37 S 3584.59 E 5946204.02 N 680478.26 E 18.553 4896.00 3347.58 S 3553.19 E 5946197.07 N 680447.01 E 11.974 4878.39 3352.86 S 3518.31 E 5946190.98 N 680412.27 E 7.326 4857.66 3355.62 S 3487.64E 5946187.49 N 680381.67 E 18.104 4838.10 Comment Alaska State Plane Zone 4 PBU EOA DS 07 Continued... 26 April, 1998- 16:54 - 3 - DrillQuest Sperry-Sun Drilling Services Survey Report for 07-19A Your Ref: API-500292088701 Prudhoe Bay Unit Measured Sub-Sea Vertical Depth Incl. Azim. Depth Depth (ft) (ft) (ft) 12984.24 89.030 268.900 8963.16 9021.16 13022.92 87.890 271.200 8964.20 9022.20 13052.82 87.980 274.500 8965.27 9023.27 13094.00 89.300 281.600 8966.25 9024.25 13124.09 89.120 283.500 8966.67 9024.67 13148.00 89.000 284.000 8967.06 9025.06 Local Coordinates Global Coordinates Dogleg Vertical Northings Eastings Northings Eastings Rate Section (ft) (ft) (ft) (ft) (°/100ft) (ft) 3356.79 S 3450.43 E 5946185.45 N 680344.49 E 5.314 4812.81 3356.76 S 3411.76 E 5946184.57 N 680305.84 E 6.635 4785.65 3355.27 S 3381.92 E 5946185.36 N 680275.97 E 11.034 4763.65 3349.51S 3341.19 E 5946190.16 N 680235.11 E 17.532 4730.96 3342.97 S 3311.82 E 5946196.01 N 680205.60 E 6.342 4705.69 3337.29 S 3288.60 E 5946201.14 N 680182.25 E 2.150 4685.34 All data is in feet unless otherwise stated. Directions and coordinates are relative to True North. Vertical depths are relative to Well. Northings and Eastings are relative to Well. The Dogleg Severity is in Degrees per 100ft. Vertical Section is from Well and calculated along an Azimuth of 135.421 ° (True). Based upon Minimum Curvature type calculations, at a Measured Depth of 13148.00ft., The Bottom Hole Displacement is 4685.34ft., in the Direction of 135.421° (True). Comment Projected Survey Alaska State Plane Zone 4 PBU EOA DS 07 26 April, 1998 - 16:54 - 4 - DrillQuest WELL LOG TRANSMITT ~AL To: State of Alaska May 6, 1998 Alaska Oil and Gas Conservation Comm. Attn.: Loft Taylor 3001 Porcupine Dr. Anchorage, Alaska 99501 C~. O~ ~ RE: MWD Formation Evaluation Logs D.S. 7-19A, ,M~-MW-80171 The technical data listed below is being submitted herewith. Please address any problems or concerns to the attention of.' Ali Turker, Sperry-Sun Drilling Services, 5631 Silverado Way, #G, Anchorage, AK 99518 D.S. 7-19A: 2" x 5" MD Gamma Ray Logs: 50-029-20887-01 2" x 5" TVD Gamma Ray Logs: 50-029-20887-01 1 Blueline 1 Folded Sepia 1 Blueline 1 Folded Sepia 5631 Silverado Way, Suite G · Anchorage, Alaska 99518 · (907) 563-3256 · Fax (907) 563-7252 A Division of Dresser Industries, Inc. WELL LOG TRANSMITrAL To: State of Alaska May 6, 1998 Alaska Oil and Gas Conservation Comm. Attn.' Loft Taylor 3001 Porcupine Dr. Anchorage, Alaska 99501 MWD Formation Evaluation Logs - D.S. 7-19~ AK-MW-80171 The technical data listed below is being submitted herewith. Please acknowledge receipt by returning a signed copy of this transmittal letter to the attention of.' Ali Turker, Sperry-Sun Drilling Services, 5631 Silverado Way, #G, Anchorage, AK 99518 1 LDWG formatted Disc with verification listing. API#: 50-029-20887-01. 5631 Silverado Way, Suite G · Anchorage, Alaska 99518 · (907) 563-3256 · Fax (907) 563-7252 A Division of Dresser Industries, Inc. MEMORANDUM State of Alaska Alaska Oil and Gas Conservation Commission TO: THRU- David John, Q~n/, Chairman-~-"- Blair wondzell, P. I. Supervisor FROM' Chuck Scheve; c_5' SUBJECT: Petroleum Inspector DATE: FILE NO: March 29, 1998 ag9kc3fe.doc CTU -BOPE Test Nabors 3S PBU DS 7-19A PTD 98-29 Sunday March 29, 1998: I traveled to ARCO's DS 7-19A Well and witnessed the weekly BOPE test on the Dowell CTU / Nabors 3S Rig. As the attached AOGCC BOPE Test report shows there were 2 failures. The Blind Shear rams failed to pressure test, these were replaced and failed a second time. A __ __ closer inspection of the BOP body cavity revealed a defect in the sealing su. rface_ that will require extensive repairs-. The lower ~ 7/8" pip(~ ram~i-~vhich are no longer needed on this well, were replaced with straight blind rams and tested OK. The Blind / Shear Rams were left in place to maintain the capability to shear pipe. Upon completion of this well the failed ram body will be sent to the manufactuer for repair. The second failure was the Hyd. Choke which would not function properly from the control panel on the rig floor. Parts are on order to repair the choke panel, and will be installed before beginning operations on the next well. The rig and Coil tubing unit were clean and all related equipment appeared to be in good working order. Summary: Nabors 3S, I witnessed the weekly BOPE test on Dowell/Nabors Rig 3S. 3129198, Test Time 11 hour, 2 failures Attachment: ag9kc3fe.xls X Unclassified · , STATE OF ALASKA OIL AND GAS CONSERVATION COMMISSION Coil Tubing Unit BOPE Test Report OPERATION: Drlg: Drlg Contractor: Operator: Well Name: Casing Size: Test: Initial X Workover: DATE: Nabors/Dowell Rig No. 3S PTD # gB-2g Rig Ph.# Arco Rep.: Arvill Bass 7-19A Rig Rep.: Dave Dooer Set @ Location: Sec. 34 T. llN R. 14E Meddian Weekly X Other 3/29/98 659-5516 BOP STACK: Coil Tubinq Unit: Pipe/Slip Rams 1 Pipe/Slip Rams Blind Rams Reel Isolation Valve Deployment: Annular Preventer Pipe Rams Lower Pipe Rams Blind Rams Choke Ln. Valves HCR Valves 1 Kill Line Valves 2 Test Quan. Pressure P/F 250/4500 P 250/4500 P 250/4500 F 250/4500 P 1 1 1 1 250/2500 P 1 250/4500 P 1 250/4500 P 250/4500 250/4500 CHOKE MANIFOLD: Quan. No. Valves f3 No. Flanges Manual Chokes Hydraulic Chokes Test Pressure P/F 250/4500 P 26 250/4500 ACCUMULATOR SYSTEM: System Pressure Pressure After Closure 200 psi Attained After Closure System Pressure Attained Blind Switch Covers: Master: Nitgn. Bt's: 4~2100 Functioned Functioned P P MUD SYSTEM: V'~ual Alarm MISC. INSPECTIONS: Tdp Tank Location Gen.' OK Pit Level Indicators OK OK Housekeeping: OK Meth Gas Detector OK OK Permit to ddll: Yes H2S Gas Detector OK OK Standing Order Posted Yes 2400 , minutes ~5 minutes 30 OK Remote: Psig. sec. seC. OK Well Sign OK Drl. Rig OK Hazard Sec. OK Number of Failures: 2 ,Test Time: 11.0 Hours. Number of valves tested 20 Repair or Replacement of Failed Equipment will be made within 0 days. Notify the Inspector and follow with Written or Faxed verification to the AOGCC Commission Office at: Fax No. 276-7542 Inspector North Slope Pager No. 659-3607 If your call is not returned by the inspector within 12 hours please contact the P. I. Supervisor at 279-1433 I REMARKS: Blind Shear rams failed to pressure test ,replaced and failed second test. Replaced 2 7/8" rams with blind rams and tested OK. Choke pane/not workin~l properly parts on order Distribution: orig-Well File c - Oper.ARig c- Database c - Tdp Rpt File c- Inspector STATE WITNESS REQUIRED? YES X NO 24 HOUR NOTICE GIVEN YES X NO Waived By: W'rtnessed By: Chuck Scheve Form Revised 2/20/97 L.G. ag9kc3fe 3/30/98 TONY KNOWLES, GOVERNOR ~L&SKA OIL AND GAS CONSERVATION COMMISSION 3001 PORCUPINE DRIVE ANCHORAGE, ALASKA 99501-3192 PHONE: {907) 279-1433 FAX: {907) 276-7542 March 3. 1998 Erin Oba Enginccring Supervisor ARCO Alaska Inc. P O Box 100360 Anchorage. AK 99510-0360 Prudhoc Bay Unit 7-19A ARCO Alaska. Inc. Permit No: 98-29 Sur. Loc.: 1479'FNL. 608'FWL. Sec. 34. T1 IN. RI4E. UM Btmhole koc: 4700'FNk. 1396'FEL. Sec. 34. T11N. R14E. UM Dear Ms. Oba: Encloscd is thc approvcd application for permit to rcdrill thc abovc rcfcrcnccd well. Thc pcrmit to rcdrill does not exempt you from obtaining additional pcrmits required by lax,.' from other governmental agcncics, and docs not authorizc conducting drilling opcrations until all other rcquircd pcrmitting dctcrminations arc made. Blowout prcvcntion cquipmcnt (BOPE) must bc tcstcd in accordancc with 20 AAC 25 035. Sufficicnt notice (approximately 24 hours) must be given to allow a rcprcscntativc of thc Commission to witncss a test of BOPE installcd prior to drilling new holc. Noticc may be given bv contacting the Commission petroleum field inspector on thc North Slope pager at 659-3607. D i W hns ~ BY ORDER OF THE COMMISSION dlffEnclosurcs CC: Dcpartmcnt of Fish & Game. Habitat Scction w/o cncl. Dcpartmcnt of Environmcntal Conscrvation w/o cncl. STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMMISSION PERMIT TO DRILL ~ of Work Ddll Reddll XTlb. T e of Well Exp~ StOic Test_ De__.~._~ment Oil Development Gas_ SingleZ~one ~ Multi ~e.p_.~_~ne_ Re-Ent..ry__=._ Dee_pen ~ Service _ 5.Datum Elevation (DF or KB) 10. Field and Pool 2. Name of Operator ARCO Alaska, Inc. RKB 58' 3. Address 6. Property Designation Prudhoe Bay Field P.O. Box 100360 Anchorage, AK 99510-0360 ADL~,7,4-7~ 2, ~ ~ ~'~ /"l:f Prudhoe Bay Oil Pool 4. Location of well at surface 7. Unit or property Name 11. Type Bond (see 20 AAC 25.025) 1479' FNL, 608' FWL, Sec 34, T11N, R14E, UM. Prudhoe Bay Unit Statewide At top of productive interval 8. Well number Number 149' FSL, 164' FWL, Sec 35, T11N, R14E, UM 7-19A #U-630610 At total depth 9. Approximate spud date Amount (Proposed) 4700' FNL, 1396' FEL, Sec 34, T11N, R14E, UM. March, 1998 $200,000 12. Distanceto nearest I 13. Distanceto nearest well 14. Numberof acres in property 15. Proposed depth (MDandTVD) property line No Close Approach 13190' MD / 9029' TVD 16. To be completed for deviated wells 17. Anticipated pressure (see 20 AAC 25.035(e)(2)) kickoff depth 11200' MD Maximum holeanCe 90° Maximumsudace 3310 psig Attotaidepth(TVD) 8800' I Setting Depth i8. Casing program Top Bottom Quantity of cement Size ~cation ~ Len t.~.~ MD TVD MD TVD Hole Casin_~ Weight Grade ~~ ~ ~ 3-3/4" 2-7/8" 6.4 L-80 I FL4$ 2640' 10550' 8195' 13190' 9029' 12 bbls 19. To be completed for Reddll, Re-entry, and Deepen Operations. Present well condition summary Total depth: measured 11755 feet Plugs(measured) true vertical 9207 feet ORIGINAL Effective depth: measured 11520 feet Junk (measured) true vertical 9004 feet easing Length Size Cemented Measured depth True Vertical depth Conductor 79' 20" 1900# Poleset 79' 79' Surface 2498' 13-3/8" 2030 Sx Fondu & 400 Sx PFC 2556' 2556' Production 10768' 9-5/8" 500 Sx CIG & 300 Sx PFC 10826' 8417' Liner 1181' 7" 325 Sx CIG 11755' 9207' Perforation depth: measured '.. !.'. 11473 - 11490' " true vertical 8963 - 8978' 20. Attachments Filing fee __x Property plat _ BOP Sketch ~ Diverter Sketch _ Drilling program "Drilling fluid program Time vs depth plot Refraction analysis _ Seabed report 20 AAC 25.050 requirements _ 21. I hereby certify that t,h'e foregoing is true and correct to the best of my knowledge d;~ d 65~ i'D ici 5 ~ 5 ~ ¢'~/(~ ,~ro~ SiCned ""~,,f~ "~/. ~ Titlle Engineering Supervisor Date Commission Use Onl}, APl number t Approvaldate ,~i ) ~ See cover letter for Permit~_~ber~. '~--~ 50- (~ ~' -- ~ O ~ ~ ~2' -- ~ ~/ "~ (-"~ other requirements Condit~'ons of approval Samples required _Yes ~..~"No Mud log required! _ Yes /~'No Hydrogen sulfide measures ,,.~'es No Directional survey required >~'Yes _ No Required working pressure for BOPE _2M; ~_3M; ~5M; _10M; _15M X 3500 psi for CTU Other: David W~ Johnston byordero, Approved by Commissionerthe commission Date I I Ruhmit in triplicate Form 10-401 Rev. 7-24-89 DS 7-19A CT Sidetrack and Completion Intended Procedure Objective: Plugback existing wellbore. Directionally drill a horizontal well from the existing wellbore. Complete with 2-7/8" cemented liner. Perforate and produce. Intended Procedure: · Cement squeeze and plugback the existing completion to - 11170' md. Mill window in 7" casing at-11200' md. Drill 10' of formation with 8.9 ppg Flopro fluid and perform Leak off test to 9.4 ppg. Directionally drill 3.75" x 1600' horizontal well to access Upper Romeo and Tango reserves. Build angle to ~90° and maintain to TD. · Run and cement 2-7/8 .... liner to TD. · Perforate selected intervals. ° Place well on production. ORIGINAL February 11, 1998 DS 7-19A Proposed CT Sidetrack Horizontal 5-1/2" Tubing Packer @ 10509' 7" Liner Top-'-~ 10574' 4-1/2" DB-6 Nipple @ 10580' Cement top in 7" 11000' 5-1/2" Camco BaI-O Nipple@ 2195' 9-5/8" Casing shoe @ 10826' Top of 2-7/8" Liner in TT Initial Perfs 7"Casing Shoe @ 11755' Window cut in 7" at - 11200' - 11205' 3-3/4" Open hole Current perforations cement squeezed 2-7/8" liner TD @ ~ 13190' S URV-EY CALCULATIONS Coordinates provided in: TRUE and GRID relative to Wellhead and ALASKA STATE PLANE Company: ARCO ALASKA INC. Rig: D/S CT I .rni! #4 AFE No: Well: 7-19A Field: Prudhoe Bay EOA BHI Rep: Calculation Method: Minimum Curv;~lure Mag. Declination: 28.350 ,lob Slat! Date: Vertical Sect. Plane: 286.350 TRUE 180.4 GRII) Grid Correction: 1,346 ,lob End Date: Surv Measured From: Mi) fi'om RKB, Total Correction: 27.0(14 I)LS per ( fl / m T¥]) from Sea level "Survey Meas. Course Incl. lqHJE Subsea Vertical Coords. - TRUE GRII) Coords. - GRID Coords. - ASP Build Turn DLS No. Depth Length Angle Azi. TVD Section N(+)/S(-) E(+)/W(-) Azi. N(+)/S(-) E(+)/W(-) N(+)/S(-) E(+)/W(-) fit) (deg) (deg) (fl) from TIP Lat. (Y) l)ep. (X) (deg) Lat. (Y) Dep. (X) Lat. (Y) Dep. (X) °/100fl. °/100ft. °/100ft. Tie-in 11100.0 0.0 32.75 134.00 8587.24 0.00' -3684.50 4867.88 132.65 -3569.13 4953.09 5945891.2 681769.3 0.00 0.00 0.00 1. TIP. 11 11200.0 10.0 32.00 135.99 8671.70 -47.00 -3722.35 4905.75 134.64 -3606.08 4991.84 5936430.2 704117.4 -0.70 2.00 1.30 2. KOP. 14 11225.0 5.0 30.45 139.77 8693.08 -58.00 -3731.95 4914.44 138.42. -3615.48 5000.76 5936373.4 704063.7 -6.00. 15.70 10.00 3.00 22 11300.0 10.0 22.91 188.62 8760.82 -76.10 -3761,27 4924.66 187.27 -3644.55 5011.66 5936171.8 703986.2 0.40 77.20 30.00 4.00 27 11350.0 10.0 17.35 230.29 8807.98 -73.20 -3775.74 4917.43 228.94 -3659.18, 5004.76 5936025.7 703960.6 -2.80 99.00 30.00 5.00 56 11632.6 2.6 90.00 302.53 8974.38 123.20 -3715.20 4730.45 301.18 -3603.05 4816.42 5935249.5 704252.3 28.80 8.60! 30.00 6.00 86 11929.5 9.5 90.15 287.01 8974.00 416.10 -3591.18 4461.69 285.66 -3485.38 4544.82 5934468.1 704543.4 0.00 -5.20 5.20 7.00 119 12250.0 10.0 90.14 270 98 8973.18 732.90 -3541.25 4146.16 269.63 -3442.88 4228.21 5946017.5 681044.4 0.00 -5.00 5.00 8.00 213 13190.1 10.1 90.11 309.88! 897,1.00 1652.60 -3219.34 3282.03 308.53 -3141.35 3356.75 5946319.0 680173.0 0.00 4.10 4.10 9) TD. ARCO ALASKA INC. ARCO ALASKA INC. 7-19A Coiled Tubing Sidetrack EOA Prudhoe Bay, Alaska Reference to TRUE North t.i Mag (+28 35 ) 8300-- 85OO 8700 . 8900- 9100 -2800 o Scale I inch = 400 feet O (33 O 4~ O0 bo O O O O O O O O O O }0 TIP MD 11100 32.7~- KOP MD 11200 32.0~ MD 11225 30.4~ MD 11300 22.9~ 5 MD 11350 17.4~ 3600 - ---4000 C:~RCOALK\7-19A\7-19AT1.DW2 JANUARY 19 1998 JGM 7-19AT 1 7-19ORTR 6 MD 11632 90.0-'- MD 11929 90.1-,, 8 MD 12250 90.1~ 9 TD 8971.0 TVD MD 13190 90.1'-- Scale linch = 200 feet Vertical Section = 286.35° III bO O' bO -la, 03 O0 --~ ~ --~ O O O O O bO -1~ O O, O O O O O O O O , O O O O SURVEY CALCULATION WORKSHEET True Relative to Wellhead Company: ARCO ALASKA INC. Rig: D/S #7 Well: 7-19A Fiehl: Pmdhoe Flay WOA AFE No: 0 BHI Rep: 0.0 Job No: O Calculation Method: Vertical Sect. Phtne: Sun' Measured From: Survey No. 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 Date Minimum Cun:ature Mag. Declination: 28.350 286.350 degrees TRUE Grid Correction: 1.346 MD frown RKB, Total Grid Correction: 27.004 TVD fi'om Sea level t58'I Survey Depth (rt) 11100.0 11110.0 11120.0 11130.0 11140.0 11150.0 Ct)Ill'Se Length (ft) 10.0() 10.00 10.0(,i 10.00 10.00 11160.0 10.0(} 11170.0 10.00 11180.0 10.00 11190.0 11200.0 11210.0 11220.0 10.00 1().00 10.00 10.00 Incl. Angle ({leg) 32.75 32.67 32.60 32.52 32.45 32.37 32.30 32.22 32.15 32.08 32.00 31.37 3().75 30.45 29.51 11225.0 5.00 11230.0 5.00 11240.() 10.00 27.75 11250.0 1().00 26.20 11260.0 10.0() 24,91 11270.0 11280.0 11290.0 11300.0 11310.0 Hole Azimuth ({leg) 134.00 134.20 320.0 330.(I 340.0 350.0 134.39 134.59 134.79 134.98 135.18 135.38 135.59 135.79 1.35.99 137.46 138.99 139.77 142.10 147.19 152.86 Subsea TVD (t't) 8587.24 Vertical Section from TIP 0.(')0 Job Start Date: Job End Date: DLS per (ft/m): Total Coordinates N(+) / S(-) Lat. (Y) -3684.50 1. TIP. 8595.65 -4.80 -3688.26 0.0 86(14.(}8 -9.5(I -3692.03 0.0 8612.50 -14.3(.) -3695.80 0.0 - 19.()0 -23.70 8620.94 8629.38 8637.83 -3699.58 -3703.36 -37(i}7.14. -28.4() 0.0 0.0 0.0 0.0 8646.29 -33.10 -3710.94 8654.75 -37.70 -3714.74 0.0 8663.22 -42.40 -3718.54 1.27 0.0 8671.70 -47.00 -3722135 2. KOP. 868(.}.21 8688.77 8693.08 8697.41 8706.19 8715.10 8724.12 8733.23 00-Jan-00 00-Jan-00 100.0 159,13 10.00 23,89 165.97 10.0() 23.21 173.28 8742.40 1(.).00 22.87 180.91 8751.6(.) 10.()0 22,91 188.62 876(i}.82 1().00 10.()(,) I 0.0() 1(),00 10.00 195.02 2(}2.45 210,95 -51.50 -55.90 -58.00 -60.10 -63,90 -67: l (2} -69.90 -72.20 Co nllnents -3726.17 9.96 0.0 -3730.02 10.04 0.0 -3731.95 9.95 3.0 /' -3733.89 -3737.79 -3741.71 -3745.65 -3749.58 -3753.50 -3757.40 -3761.27 -3764.94 -3768.22' -3771.12 -3773.63 Dog Leg E(+) / W(-) SeveriD' Dep. (X) (deg/100') 4867.88 ().00 4871.76 1.34 4875.62 1.24 4879,46 1.34 4883.28 1.28 4887.08 1.30 4890.85 1.28 4,894.61 1.33 4898.34 1,32 4902.06 4905.75 1,33 4909.35 4912.79 4.914.44 4916.02 4918.79 4921.06 4922.82 4924,06 4924..78 4924.98 4924.66 4923,90 4922.80 4921.34 4919.55 4917.43 -3775.74 -74.00 -75.30 -76.1(} 8770.09 -76.40 8779.4.7 -76.30 8788.93 -75,7(I 220.34 8798.44 -74,7(> 230.291 88(}7.98 -73.2(.) 21.10 19.57 18.39 17.63 17.35 29.92 0.0 30.()6 0.0 30.O 1 0.0 29.95 0.0 30.O2 0.0 29.97 0.0 30.O4 0.0 29.97 4.0 3O.02 0.0 29.98 0.0 30.O3 0.0 29.98 0.0 30.()() 5.0 Sutwey Survey Course 'Incl. ltole Subsca Vertical Total Coordinates Dog Leg No. Date Depth Length Angle Azimuth TVD Section N(+) / S(-) E(+) / W(-) Se~'erit3' Comments (t'~) (ft! ((le~} !(Je~) Ir't! from TIP Lat. IYt Dep. (X) !de, lO0') . 28 11360.0 10.00 18.45 239.39 8817.50 -71.30 -3777.5(.) 4914.92 30.02 0.0 29 11370.0 10.00 19.92 247.35 8826.94 -68.90 -3778.96 4911.98 29.97 0.0 30 11380.0 10.00 21.70 254.15 8836.29 -66.00 -3780.12 4908.63 29.98 0.0 3l 11390.0, 10.00' 23.72 259.91 8845.52 -62.60 -3780.98 4904.87 30.02 0.0 32 11400.0 10.00 25.92 264.78 8854.59 -58.80 -3781.53 4900.71 30.02 0.0 33 11410.0 1().00 28.26 268.92 8863.50 -54.50 -3781.77 4896.17 30.04 0.0 34 11420.0 10.00 30.70 272.46 8872.20 -49.80 -3781.71 4891.25 29.97 0.0 35 11430.0 10.00 33.23 275.52' 8880.69 -44.60 -3781.33 4885.97 30.04 0.0 36 11440.0 10.00 35.82 278.18 8888.92 -39.00 -378(.).65 4880.35 29.96 0.0 37 11450.0 10.00 38.46 280.54 8896.90 -33.(.)(i) -3779.67 4874.39 30.00 0.0 ' ,,, 38 11460.0 10.00 41.15 282..63 8904.58 -26.70 -3778.38 4868.12 30.04 0.0 39 11470.0 1().0() 43.87 284.50 8911.95 -19.90 -3776.79 4861.55 29.99 0.0 40 11480.0 I().0() 46.61 286.20 8918.99 -12.80 -3774.91 4854.71 29.94 0.0 41 11490.0 10.(.)0 49.38 287.75 8925.68 -5.40 -3772.74 4847.60 30.(~0 0.0 '42 11500.0 10.0() 52.17 289.18 8932.00 2.40 -3770.29 484(.).26 30.02 0.0 43 11510.0 10,00 54..98 290.50 8937.94 10.40 -3767.55 4832.69 30.04 0.0 44 11520.0 10.()0 57.80 291.73 8943.48 18.70 -3764.55 4824.92 30.00 0.0 45 11530.0 10.00 60.63 292.89 8948.59~ 27.20 -3761.29 4816.98 30.0('~0.0 46 11540.0 1(.).00 63.47 293.99 8953.28 36.00' -3757.78 4808.87 3(.).020.0 ,17 11550.0 10.00 66.31 295.03 ~ 8957,52 45.00 -3754,()2 4800.64 29.92 0,0 48 11'560.0 10.00 69.17 296.03 8961.31 54.10 ~3750.03 4792.29 30.06 0.0 49 11570.0 10.0(.) 72.03 296.99 8964.63 63.4(.) -3745.82 4783.85 30.(i)00.0 50 11580.0 10.00 74.89 297.93 8967.48 72.80 -3741.40 4775.34 29.99 ~ 0.0 51 11590.0 10.00 77.76 298.83 8969.84 82.30 -3736,78 4766,79 30.0(')0.0 52 11600.0 1(.).00 8(').63 299.72 8971.72 91.90 -3731.98 4758.23 30.0(.)0.0 53 11610.0 1().0(.) 83.50 300.59 8973.10 1(')1.50 -3727.00 4749.66 29.97 0.0~ 54 11620.0 1(i).00 86.38 301.45 8973.98 111.10 -3721.87 ~1741.13 3(I.05 0.0 55 11630.0 1 ().00 89.25 302.31 8974.36 12(').7(.) -3716.59 4732.64 29.96 0.0 56 11632.6 2.60 90.00 302.53 8974..38 123.20 -3715.20 4730.45 3().06 6.0 57 11640,0~ 7.40 90.00 302.15 8974.38 130.30 -3711.24 4724.2(/ 5.14 0.0 58 11650.0 10.00 90.01 301.62 8974.38 14().00 -3705.96 4715.71 5.30 0.0 59 11660.0 10.00 90.01 301.10 8974.38 14.9.60 -37(')0.75 4707.17 5.20 0.0 6(.) 11670.0 10.00 90.02 300.58 8974..37 159,30 -3695.63 4.698.58 5.20 0.0 61 11680.0 1().00 90,021 300.06 8974.37 169.00 -3690.58 4689.95 5.20 0,0 "{' -3685.6 4.681,27 5.30 0.0 62 11690.0 10,00 90.03 299.53 8:)74.37 178.70 1. 63 11700.0 10.00 90.03 299.01 8974.36 188.50 -3680.72 4672.55 5.20 0,0 64 11710.0 10.0() 90.04 298.49 8~)74.35 ! 198.30 -3675.91 4663.78 5.2(.)0.0 65 11720.0 1().00 90.04 297,96 8974.35 208.()0 -3671.18' 4654.97 5.30 0.0 Survey Survey Course Incl. Hole Subsea Vertical Total Coordinates Dog Leg No. Date Depth Length Angle Azimuth TVD Section N(+) / S(-) E(+) / W(-) Severit3.' Comments (ft) {it} (de~} tde~) Irt! from TIP Lat. fYt Del'. (X) (de~/100'2 66 11730.0 10.0(,) 90.05 297.44 8974.34 217.90 -3666.53 4646.12 5.2(,I 0.0 67 11740.0 10.0() 90.05 296.92 8974.33 227.70 -3661.97 4637.22 5.20 '0.0 68 11750.0 10.00 90.(/6 296.39 8974.32 237.50 -3657.48 4628.28 5.30 0.0 69 11760.0 10.00 90.06 295.87 8974.31 247.40 -3653.08 4619.30 5.20 0.0 70 11770.0 10.00 90.07 295.35 8974.30 257.20 -3648.75 4610.29 5.20 0.0 ~94.83 8974.29' 267 10 -3644.51 4601.23 5.20 0.0 71 11780.0 10.00 90.07 '~ ' . 72 11790.0 10.0(I 90.08' 294.3(/ 8974.27 277.(,1(.)' -3640.36 4592.14 5.3(.}0.0 73 11800.0 10.00 90.08 293.78 8974.26 286.9(I -3636.28 4583.(1(.) 5.20 0.0 74 11810.0 10.00 9(.).09 293.26 8974.25 296.80 -3632.29 4573.83 5.20!0.0 75 11820.0 10.00 90.09 292.73 8974.23 306.80 -3628.38 4564.63 5.3(,I0.0 76 11830.0 10.00 90.10 292.21 8974.21 316.70 -3624.56 4555.39 5.20 0.0 77 11840.0 10.0(,I 9(.}.10 291.69 8974.2(} 326.70 -3620.82 4546.1 5.2('10.0 78 11850.0 10.00 90.11 291.16 8974.18 336.6(,I -3617.17 4536.80 5,3(} 0.0 79 11860.0 1(.i.00 90.11 290.64 8974.16 346.60 -3613.60 4527.4.6 5.20 0.0 80 11870.0 10.0(.i 90.12 290.12 8974.14 356.60 -3610.12 4518.09 5.20 0.0 81 11880.0 10.00 90.12 289.60 8974.12 366.6(.) -3606.72 45(.}8.68 5.20 0.0 82 11890.0 10.00 90.1.3 289.07 8974.10 376.50 -36(i)3.41 4499.25 5.30 0.0 83 11900.0 '10.00 90.13, 288.55 8974.(117. 386.50 -3600.19 4489.78 5.20 0.0 84 11910.0 10.00 90.14 288.03 8974.05 396.50 -3597.(}5 4480.29 5.20 0.0 85 i192(i.(I 1 (.I.(1(.} 9('.).14 287.50 8974.(.}3 ,1(16.5(.) -3594.(10 4470.76 5.30 0.0 86 11929.5 9.5(.I 90.15 287.01. 8974.00 416.'10 -3591.18 4461.69 5.16 7.0 87 11930.0 0.50 90.15 286.98 8974.00 416.50 -3591.04 446'1.21 6.00 0.0 88 11940.(} 10.()(} 9(.). 15 286.48 8973.97 426.50 -3588.16 4451.64 5.00 0.0 89 11950.0 10.00 90.15 285.98 8973.95 436.5(.) -3585.36 4442.03 5.000.0 90 11960.0 10.0() 90.15 285.48 8973.92 446.5(.) -3582.65 4432.4'1 5.00 0.0 91 1 '1970.0 10.(.}0 90.15 284.98 8973.89 456.5(.) -3580.02 4422.76 5.00 0.0 92 11980.0; 10.00 90.15 284.48 8973.87 466.50 -3577.48 4413.09 5.00 0.0 93 11990.0 10.00 90.15 283.98 8973.84 476.5(.) -3575.(112 4403.40 5.00 0.0 94 12000.0 10.0() 90.15 2.83.48 8973.82 486.50 -3572.65 4393.68 5.00 0.0 95 12010.0 1(.).00 90.15 282.98 8973.79 496.50 -3570.36 4.383.95 5.0('10.0 96 12020.0 10.00: 90.15 282.48 8973.76 506.5(.) -35(;8.16 4374.19 5.00 0.0 97 12030.0 10.00 9(i). 15 281.98 8973.74 516.40 -3566.(.}4 4364.42 5.00 0.0 98 12040.0 1 ().0() 9('). 15 281.48! 8973.71 526.40 -3564.(I 1 4.354.63 5.00 0.0 99 12050.0 10.00 9(/. 15. 28(').98 8973.69 536.40 -3562.06 4344.82 5.00 0.0 100 12060.0 10.00 90.15 280.48 8973.66 546.3(i) -3560.2C 4335.00 5.00 0.0 101 12070.0 1(,).0(.I 90.'15 279.98 8973.63 556.30 -3558.42 4325.15 5.0() 0.0 , 102 12080.0 10.00 90.15 279.48 8973.61 566.20 -3556.73 4315.3(.I 5.(10 0.0 103 1.2090.0 10.0(.) 90.15 278.98 8973.58 576.1() -3555.13 4305.43 5.(}0 0.0 Survey Survey Course Incl. !tolc Subsca Vertical Total Coordinates Dog Leg No. Date Depth Length Angle Azinmth TVD Section N(+) / S(-) E(+) / W(-) Severity Comments (it) (it) {de[~) (,Ic~) (It) from'riP Lat. (Y} Del,. (X) (dc~,/lO0') 104 12100.0 10.00 90.15 278.48 8973.55 586.00 -3553.61 4295.54 5.00 0.0 105 12110.0 10.00 90. I5 277.98 8973.53 595.90 -3552.18 4285.65 5.00 0.0 106 12120.0 1(I.00 90.15 277.48 8973.50 605.80 -355(.I.83 4275.74 5.0('1 0.0 107 12130.0 10.00 90.15 276.98 8973.48 615.70' -3549.58 4265.82 5.00 0.0 108 12140.0 10.00 90.14 276.48 8973.45 625.60 -3548.40 4255.89 5.0(} 0.0 1(}9 12150.0 10.0(} 90.14 275.98 8973.43 635.40 -3547.32 4245.95 5.0(1 0.0 110 12160.0 10.(.10 90.14 275.48 8973.4.(} 645.2(i -3546.32 4236.00: 5.00 0.0 111 12170.0 10.0(I 90.14 274.98 8973.38 655.(10 -3545.41 4226.04 5.00'0.0 112 1218(I.0 10.00 90.14 274.48 8973.35 664.80 -3544.58 4216.07 5.00 0.0 113 12190.0 10.00 90.14 273.98 8973.33 674.6(} -3543.85 4206.10 5.00 0.0 ; 114 12200.0 1(I.00 90.14 273.48 8973.30 684.40 -3543.2(I 4196.12 5.(100.0 '"' 115 12210.0 10.00 90.14. 272.98 8973.28 694.10 -3542.63 4186.14 5.00 0.0 116 12220.0 10.00 90.14 272.48 8973.26 703.80 -3542.16 4176.15 5.00 0.0 117 12230.0 10.00 90.14 271.98 8973.23 713.50 -3541.77 4166.16 5.00 0.0 118 12240.0 1(I.0(11 90.14 271.48 8973.21 723.20 -3541.46 4156.16 5.(}00.0 119 12250.0' 10.00 90.14, 270.98 8973.18~ 732.90 -3541.25 414.6.16 5.00 8.0 120 12260.0 10.00 90.14 271.40 8973.16 742.50 -3541 .(}4 4136.16 4.20 0.0 121 12270.0 1(I.00 90.14 271.81 8973.13 752.20 -3540.76 4'126.17 4.10 0.0 122 12280.0 '10.00 90.14 272.22 8973.11 761.9(.) -3540.4 4116.17 4.1(}0.0 123 12290.0 10.00 90.14 272.64, 8973.08 771.6(.i -3539.99 41(116.18 4.20 0.0 124 12300.0 10.00 90.14 273.05 8973.06 781.30 -3539.49 4096.20 ~ 4.10 0.0 125 12310.0 10.00 90.14 273.46 8973.04 791.00 -3538.92 4086.21 4.10 0.0 126 12320.0 10.00 90.14 273.88 8973.01 8(10.80 -3538.28 4076.23 4.20 0.0 127 12330.0 10.()0 90.14 274.29 8972.99 810.6(i -3537.57 4066.26 4.1(i} 0.0 128 12340.0 10.00 90.14 274..71 8972.96 820.4(I -3536.79 4056.29 4.20 0.0 · 129 12350.0 1 (}.0(~ 90.14. 275.12 8972.94 83(i).2(.) -3535.93 4046.33 4.10 0.0 <i' 130 12360.0 10.()0 90.14- 275.53 8972.91 84(.).(1(.} -3535.00 4036.37 4.10 0.0 131 12370.0 10.()0 90.14 275.95 8972.89 849.80 -3534.()0 4026.42 4.2(.} 0.0 132 12380.0! 10.00 90.14 2,76.36 8972.86 859.60 -3532.93 4016.4.8 4.10 0.0 133 12390.0 1(t.0(I 90.14 276.78 8972.84 869.50 -3531.78' 4006.54 4.2(}0.0 134 12400.0 10.00 90.14~ 277.19 8972.82 879.40 -3530.57 3996.62 4.10 0.0 135 12410.0 1(}.(10 9(}.14. 277.60 8972.79 889.2t} -3529.28 3986.70 4.10 0.0 136 12420.0 1(I.0(11 90.14 278.02 8972.77! 899.10 -3527.92 3976.79 4.20 0.0 !37 12430.0 10.00 90.14 278.43 8972.74 909.0() ~ -3526.49 3966.9(11 4.1(i} 0.0 138 12440.0 10.(1(} 90.14 278.84 8972.'12 918.90 -3524..99 3957.(}1 4.10 0.0 '139 12450.(I 10.0(} 90.14 279.26 89'72.69 928.90 -3523.42 3!)47.13 4.20 0.0 140 12460.0 1(,).(10 90.14 279.67 8972.67 938.8(} -3521.77 3937.27 4.10 0.0 141 12470.0 1(I.0(.t 90.14 280.09 8972.64 948.7(.) -352(}.(.}6 3927.42 4.20 0.0 Survey Survey Course Incl. Hole Subsea Vertical Total Coordinates Dog Leg No. Date Depth Length Angle Azimuth TVD Section N(+) / S(-) E(+) / W(-) Severity Comments Iff! !it! !de~) {de~) (ft) from TIP Lat. qY2 De[}. !X! !de~,100'! 142 12480.0 10.00 90.14 280.50 8972.62 958.70 -3518.27 3917.58 4.1(} 0.0 143 12490.0 10.0(} 90.14 28(}.91 8972.60 968.60 -3516.41 3907.75 4.10 0.0 144 12500.0 10.00 9(}.14 281.33 8972.57 978.60 -3514.48 3897.94 4.2(} 0.0 145 12510.0 10.0(.t 90.14 281.74 8972.55 988.50 -3512.48 3888.14 4.10 0.0 146 12520.0 10,00 90.14 282.15 8972.52 998.50! -3510.41 3878.36 4.10 0.0 147 12530.0 10.00 90.14 282.57 8972.50 1008.50 -3508.27 3868.59 4.20 0.0 148 12540.0 10,00 90.14 282.98 8972.47~ 1018.50' -3506.06 3858.84 4.10 0.0 149 12550.0 10.00 90.14 283.40 8972.45 1028.50 -3503.78 3849.1(} 4.20 0.0 '150 12560.0 10.00 90.14 283.81 8972.42 1038.40 -3501.43 3839.38 4.10 0.0 151 12570.0 10.00 90.14 284.22 8972.40 1048.40 -3499.01 3829.68 4.10 0.0 .,. 152 12580.0 10,00 90.14 284.64 8972.38 1058.40 -3496.51 3820.00 4.20!0.0 '153 12590.(} 10.00 9(}.14 285.05 8972.35 1068,40 -3493.95 3810.331 4.1(}0.0 154 12600.0 10.00 90.14 285.46 8972.33 1078.4(.) -3491.32 3800.68 4.10 0.0 155 12610.0 10.0() 90.14 285.88 8972.30 1088.40 -3488.62 3791.06: ,4.200.0 156 12620.0 10.(~0 90.14 286.29 8972.28 1098,4() -3485.85 3781,45 4.1('} 0.0 157 12630.0 10.00 90.14 286.71 8972.25 11(}8.40 -3483.(}I 3771.86 4.20 0.0 158 12640.0 10,(10 90.14 287.12 8972.23 1118.40 -3480.10 3762.29 4.10 0.0 159 12650.0 10,00 90.14 287'.53 8972.20 1128.4(.I -3477.12 3752.75 4.1(') 0.0 160 12660.0 10.00 9(), 14 287.95 8972.18 1138.40 -3474.08 3743.22 4.20 0.0 161 12670.0 10,(1(} 9(',). 14 288.36 8972.16 1148.40 -3470.96 3733.72 4.10 0.0 162 12680.0 10.0() 90.'14 288.77 8972.13 1158.4(i} -3467.78 3724.24 4,10 0.0 , 163 12690.0 10.00 90.,14 289.'19 8972.11 1168.4(') -3464,52 3714.78 4.20 0.0 164 12700.0 10.(.10 90,14 289.60 8972.08 1178.40 -3461,20 3705.35 4.10 0,0 165 12710.0 10.00 90.'14 290,02 8972.06 1188.40 -3457.81 3695.94 4.2(') 0.0 166 12720.0 10,()() 90,14 290.43 8972.(.3~ I 1198.30 -3454.36 3686.56 4.10 0.0 167 12730.0 10.00 90,14 290.84, 8972.(}1 1208.30 -3450.83 3677.20 4.10 0.0 168 12740.0 10.00 90.14 291.26 8971.98 1218.3(.) -3447.24 3667.87 4.20 0.0 169 12750.0 10,00 90.14 291.67 8971.96 1228.20 -3443.58 3658.56 4.10 0.0 170 '12760,(') 10.00 90.13 292.08 8971.94 1238.20 -3439.86 3649.28 4.1(I0.0 ' 171 12770.0 1(I.00 90.13 292,50 8971.91 1248.10 -3436.(.}6 3640.03 4.2(i} 0.0 172 12780.0 10.00 90.13 292.91 8971.8'9 1258.1(.) -3432.20 36'3(}.80 4.10 0.0 173 12790.0 1(.).0(,} 90.13 293.33 8971.87 1268.()0 -3428.28 3621.61 4.20 0.0 174 12800.0 1(}.00 90.13 293.74 8971.85 1277.90 -3424.28 3612.44 4,10 0.0 175 12810.0 10.00 90.13 294.15 8971.82 1287.80 -3420.22 3603.30 4.1(I0.0 176 ,~ 12820.0 10.(}0 90.13 294.57 8971.80 1297.70 -3416.10 3594.19 4.20 0.0 177 1283(I.0 10.0(I 90.13 2.9'4.98 8971.78 1307.60 -34 1 1.91 3585.11 4.1(i0.0 178 i'2840.0 10.()0[' 9(), 13 295.39 897 !.76 1317,5(I -340'i.65 3576.06 4,10 0.0 179 12850.0 10.(1(I90.13 295.81 8971.73 1327.40 -3403.33 3567.(i)4 4.20 0.0 ,. Survey Survey Course Incl. ltolc Subsca Vertical Total Coordinates Dog Leg No. Date Del}th Length Angle Azimuth TVD Section N(+) / S(-) E(+) / W(-) Severity Comments (,it) (ii't) {dc~4? {de,g) tR} front TIP Lat. (¥) Dell-(X} Idea/lO0') 180 12860.0 10.00 90.13 296.22 8971.71 1337.20 -3398.95 3558.06 4.10 0.0 181 '12870.0 10.00 90.13 296.64 8971.69 1347.10 -3394.5(} 3549.10 4.20 0.0 182 12880.0~ 10.00 9(}.13 297.05, 8971.66 1356.90 -3389.98 3540,18 4.1(> 0.0 183 1289(}.0 10.0(}' 90.13, 297.46 8971.64 1366.70 -3385.40 3531.29 4.10 0.0 184 12900.0 10.()0 90.13 297.88 8971.62 1376.50 -3380.76 3522,43 4.2() 0.0 185 12910.0 10.00 90.13 298.29 8971.60 1386.30 -3376.05 3513.61 4.10 0.0 186 12920.(} 10.00 90.13 298.70 8971.57 1396.10 -3371.28 3504.82 4.10 0.0 187 12930.0 10.00 90.13 299.12 8971.55 14()5.90 -3366.44 3496.07 4.20 0.0 188 12940.0 10.00 9(}.13 2.99.53 8971.53 1415.60 -3361.55 3487.35 4.1(.I 0.0 189 12950.0 10,00 9(i}.13 299.95 8971.51 1425.30 -3356,59 3478.67 4.20 0.0 190 12960.0 10.00 90.13 300.36 8971.48 1435.10 -3351.56 3470.02 4.10 ,0.0 191 12970.0 1(').0(.} 90.13 300.77 8971.46 1444.70 -3346.48 3461.41 4.10 0.0 192 12980.0 10.0(I 90.13 3(.)1.19 8971.44 1454.40 -3341,33 3452.84 4.20 0.0 193 12990.0~ 10.00, 90.13 301.60: 8971.41 1464.10 -3336.12 3444.30 4.10 0.0 194 13000.0 1(}.00 9(}.12: 302.01 8971.39 1473.7(') -3330.85 3435.80 4.1(i} 0.0 195 13010.0 10.00 90.12 302.43 8971,37 1483,30' -3325,52 3427.34 4.20 0.0 196 13020.(.I 10.(10 90.1,2 302.84 8971.35 1492.90 -3320.13 3418.92 4.10 0.0 197 13030.0 10.00 90.12 303.26 8971.33 1502.50 -3314.67 3410.54 4.2(} 0.0 198 13040.0 10.0(} 90.12 303.67 8971.31 '1512.'1(I -3309.16 34(12.20 4.10 0.0 199 13050.0 1(I.0(I 90.12 304.08 8971.29 1521.6(') -3303.58 3393.89 4.1(} 0.0 200 13060.0 10,0(I 90.12 304.50 8971.27 1531.10 -3297.95 3385.63 4.20 0.0 201 13070.0 10.00 90.12 304.91 8971.25 1540.60 -3292.26 3377.41 4.1(} 0.0 ~ , , 202 13080.0 10.00 90.12 305.33 8971.23 1550.10 -3286.5(I 3369,23 4.2(.I 0.0 203 13090.0 '10,00 90.12 305,74 8971.20 1559.50 -3280.69' 3361.09 4.10 0.0 , 204 13100.0 10.00 90.12 306.15 8971.18 1568.90 -3274.82 3353.00 4.10 0.0 205 13110.0: 10.00 90.12 306.57 '8971.16 1578.30 -3268.89 3344,95 4.2(I 0.0 · 2(16 13120.0 1().00 90.12 306.98 8971.14 '1587.70 -3262.91 3336.94 4.1(} 0.0 207 13130.0 10.00: 90.12 307.39 8971.12 1597.10 -3256.86 3328.97 4.10 10.0 208 13' 140.0 10.0(I 90.12 307.81 8971.10 1606.4(} -325(}.76 3321.(}5 4.20 0.0 209 13150.0 10.00 90.12 308.22 8971.08 1615.70 -3244.60 3313.17 4.1(} 0.0 2'10 13160.0 10.00 90.12 308.64 8971.06~ 1624.9(} -3238.39 3305.33 4.2(} 0.0 211 13170.0 10.00 90.12 309.05 8971.04 1634'.20 -3232.11 3297.54 4.10 0.0 212 13180.0 1(I.00 9(}.12 309.46 8971.02 1643.40 -3225.79 3289.8(.I 4.1(110.0 213 13190.1 10,10 9(}.11 309.88 8971.()0 1652.60 -3219.34 3282.03 4.16 9) TD.' 1990 ft. fi'om KOPto TD. - .-C T Drilling Wellhead Detail ~ CT Injector Head Methanol Injection tis7" WLA Quick onnect ~ I Stuffing Box (Pack-Off), 10,000 psi Working Pressure 7" Riser Annular BOP (Hydril),7-1/16" ID 5,000 psi working pressure Alignment Guide Flange 7-1/16", 5M Ram Type Dual ~ Gate BOPE Flanged Fire Resistant Man Kelly Hose to Dual HCR Choke Manifold Cutters or Combination CuttedBlinds Slip / Pipe rams Manual Valves Drilling spool 7-1/16", 5M by 7-1/16", 5M Ram Type Dual Gate BOPE Manual over Hydraulic 7-1/16" ID with Pipe/Slip Rams Manual Master Valve o.458' (5.5") 2" Pump-In Hanger Fire resistant Kelly Hose to Flange by Hammer up 1/4 Turn Valve on DS Hardline to Standpipe manifold 9-5/8" Annulus 13-3/8" Annulus Mu~ Tanks 60/40 I TrplxI k~re Ext. Fuel Shop oilers Water Pump Rool Fire Ext. P~re Ext. ,~~Pipe rac,~ owellDrilling quipment Traillr Preferred Major Equipment Layout for CT Drilling STATE OF ALASKA ? ,.ASKA OIL AND GAS CONSERVATION COMMISSION APPLICATION FOR SUNDRY APPROVALS' 1. Type of request: Chan~e approved ~rogra'n _ 2. Name el Operator. ARCO Alaska, Inc. Abandon _X Suspead _ O~'aton Shutd<~rn _ Repax well _ Plugging _X nme exle~on _ Pul lubing _ Variance_ Perforate_ 5. Type of Well: Developrnmt_X Exp~(xam'y _ S~atagrapc _ Service_ Address: P.O. Box 100360 Anchorage, AK 99510-0360 Location of well at sudace: 1479' FNL, 608' FWl., Sec 34, T11N, R14E, UM Attop d productive interva]: 149' FSL, 164' FWL, Sec 35, T11N, R14E, UM At effective depth: At total depth: 117' FNL, 440' FWL, Sec 2, T11N, R14E, UM 12. Present we~l condition summa,'y Total Depth: Effective Del:Xh: CaNng rneasu~ 11755 feet Plugs (measured) true vertical 9207 feet measur~ 11520 feet Junk (measured) true vertical 9004 feet Length Size Cemented Reenter suspended wei _ S~mulate_ Ol'~et _ 6. Datum d elavatio~ (DF or KB feet): 58' RKB 7. Unit or Property: Prudhoe Bay Unit 8. Well number. 7-19 ~9. Permit number. 82-217 10. APl number:. 50-029-20887 11. Fie{d/Pod: Prudhoe Bay Oil Pool Tagged PBTD at 11580' MD (6/1/97).. Measured depth True vertical depth Conductor 79' 20' 1900# Pole.set Surface 2498' 13-3/8' 2030 Sx Fondu & 400 Sx PFC Production 10768' 9-5/8' 500 SX Class G & 300 Sx PFC Liner 1181' 7" 325 Sx Class G Perforation Depth memured 11473-11490' truever~c~ 8963-8978' Tubing (size, grade, and measured depth) 5-1/2', 17#, L-80 PCT @ 10520' MD; 4-1/2', 12.6#, L-80, PCT @ 10594' MD. Pad(em end SSSV (type and measured defXh) Baker SAB Packer @ 10509' MD; 5-1/2' Camco Ba]-O SSSV @ 2195' MD. 79' 2556' 10826' 11755' 79' 2556' 6417' 92O7' 13. Attachments 14. Estimated date for c(xnmencing q3eration Deechpfion sumrnar~ of proposal _X Februa,'y, 1998 16. If proposalwas ve~oally approved Name et aj:)prover Date al)proved Detailed operations p~ram _ BOP sketch _X I15. Status of well classification as: Oil _X G~s _ Suspended _ 17. I hereby certify that the forgoing is We end correct to the best et my knowledge. 'r~e: Engineering Supervisor FOR COMUISSION USE ONLY Condi'dons d approval: Notify Comission so mpreeen~itive may witness Plug iategre{y _ BOP test _ Loca~n clearance _ Mechanical integre{y test _ Subsequent form required 10- Date ,~'-' Approved by ord e r of th e Comrmsslon e r ~,._"'----"~.,~,) ~.~',_.~,~ ,~,)-'"-' Form 10-403 Rev 06/15/88 Commissioner Date SUBMIT IN TRIPUCAT · WELL PERMIT CHECKLIST COMPANY FI ELD & POOL ~""~'/'<::~ ~"<:E:;, INIT CLASS 1~ ~ WELL NAME ,/_~ 2-,//" .,/..--~.'.~_., '/ GEOL AREA / PROGRAM:, exp [] dev/~ redrl~serv [] wellbore seg E: ann. disposal para req UNIT# ,////~._<~,,,-~ ON/OFF SHORE ADMINISTRATION ENGINEERING 1. Permit fee attached ....................... 2, Lease number appropriate ................... 3. Unique well name and number .................. 4, Well located in a defined pool .................. 51 Well located proper distance from drilling unit boundary .... 6. Well located proper distance from other wells .......... 7. Sufficient acreage available in drilling unit .......... 8, If deviated, is wellbore plat included ............ 9. Operator only affected party ................. 10. Operator has appropriate bond in force ............. 11. Permit can be issued without conservation order ....... 12. Permit can be issued without administrative approval ...... 13. Can permit be approved before 15-day wait ........... N Y N yY N 14. Conductor string provided ................... Y N 15. Surface casing protects all known USDWs ........... Y N 16. CMT vol adequate to circulate on conductor & surf csg ..... Y N 17. CMT vol adequate to tie-in long string to surf csg ........ Y N 18. CMT will cover all known productive horizons .......... ~)" N 19. Casing designs adequate for C, T, B & permafrost ...... ~N 20. Adequate tankage or reserve pit ................. L.ION 21. If are-drill, has al0-403forabandonmentbeenapproved... Y N' 22. Adequate wellbore separation proposed ............. ¥ 23. If diverter required, does it meet regulations .......... 24. Drilling fluid program schematic & equip list adequate ..... 25. BOPEs, do they meet regulation ...... .~~ ...... (,~ ,!'4. 26. BOPE press rating appropriate; test to .,,~,.~ c,,c.,, psig. 27. Choke manifold complies w/APl RP-53 (May 84) ........ 28. Work will occur without operation shutdown ........... (~ N 29. Is presence of H:~S gas probable ................. ~ N GEOLOGY APPR DATE 30. Permit can be issued w/o hydrogen sulfide measures ..... Y N,,~~ ./3 31. Data presented on potential overpressure zones ....... ,,Y,.r~ /~--~ /'"'/ ~ 32. Seismic analysis of shallow gas zones ............. /Y/N 33. Seabed condition survey (if off-shore) ............. /Y N 34. Contact name/phone for we_eklyprogress repqrts ..... ./,1// Y N ~explorgtory on~y] REMARKS GEOLOGY: ENGINEERING' COMMISSION: JDH ~ RNC CO ~/'~ Comments/Instructions: Well History File APPENDIX Information of detailed nature that is not particularly germane to the Well Permitting Process but is part of the history file. To improve the readability of the Well History file and to simplify finding information, information, of this nature is accumulated at the end of the file under APPENDIX. No special effort has been made to chronologically organize this category of information. Sperry-Sun Drilling Services LIS Scan Utility Mon May 04 12:17:29 1998 Reel Header Service name ............. LISTPE Date ..................... 98/05/04 Origin ................... STS Reel Name ................ UNKNOWN Continuation Number ...... 01 Previous Reel Name ....... UNKNOWN Comments ................. STS LIS Writing Library. Scientific Technical Services Tape Header Service name ............. LISTPE Date ..................... 98/05/04 Origin ................... STS Tape Name ................ UNKNOWN Continuation Number ...... 01 Previous Tape Name ....... UNKNOWN Comments ................. STS LIS Writing Library. Scientific Technical Services Physical EOF Comment Record TAPE HEADER PRUDHOE BAY UNIT MWD/MAD LOGS WELL NAME: API NUMBER: OPERATOR: LOGGING COMPANY: TAPE CREATION DATE: JOB DATA JOB NUMBER: LOGGING ENGINEER: OPERATOR WITNESS: MWD RUN 1 AK-MW-80171 D. LABRECQUE A. BASS 7-19A 500292088701 ARCO ALASKA, INC. SPERRY-SUN DRILLING SERVICES 04-MAY-98 MWD RUN 2 AK-MW- 80171 D. LABRECQUE A. BASS MWD RUN 3 AK-MW- 80171 D. LABRECQUE A. BASS JOB NUMBER: LOGGING ENGINEER: OPERATOR WITNESS: MWD RUN 7 AK-MW-80171 D. LABRECQUE A. BASS MWD RUN 8 AK-MW-80171 D. LABRECQUE A. BASS MWD RUN 9 AK-MW- 80171 D. LABRECQUE A. BASS JOB NUMBER: LOGGING ENGINEER: OPERATOR WITNESS: SURFACE LOCATION SECTION: MWD RUN 10 AK-MW-80171 D. LABRECQUE A. BASS MWD RUN 11 AK-MW-80171 D. LABRECQUE A. BASS 34 TOWNSHIP: RANGE: FNL: FSL: FEL: FWL: ELEVATION (FT FROM MSL 0) KELLY BUSHING: DERRICK FLOOR: GROUND LEVEL: WELL CASING RECORD 1ST STRING 2ND STRING 3RD STRING PRODUCTION STRING OPEN HOLE REMARKS: liN 14E 1479 608 .00 .00 .00 CASING DRILLERS BIT SIZE (IN) SIZE (IN) DEPTH (FT) 3.750 13148.0 1. ALL DEPTH ARE MEASURED DEPTHS (MD) UNLESS OTHERWISE NOTED. 2. ALL GAMMA RAY DATA (SGRD) IS DOWNHOLE RECORDED. 3. MWD RUNS 1,2,3,7,8,9,10 AND 11 ARE DIRECTIONAL WITH SCINTILLATION TYPE GAMMA RAY (NGP). 4. MWD RUNS 4,5, AND 6 CONTAIN NO VALID DATA AND ARE NOT PRESENTED. 5. THIS WELL REACHED A TOTAL DEPTH (TD) OF 13148'MD, 8967'SSTVD. SROP = SMOOTHED RATE OF PENETRATION WHILE DRILLING. SGRD = SMOOTHED GAMMA RAY. $ File Header Service name ............. STSLIB.001 Service Sub Level Name... Version Number ........... 1.0.0 Date of Generation ....... 98/05/04 Maximum Physical Record..65535 File Type ................ LO Previous File Name ....... STSLIB.000 Comment Record FILE HEADER FILE NUMBER: 1 EDITED MERGED MWD Depth shifted and clipped curves; all bit runs merged. DEPTH INCREMENT: .5000 FILE SUMMARY PBU TOOL CODE START DEPTH STOP DEPTH GR 11060.0 13121.5 ROP 11091.5 13150.0 $ BASELINE CURVE FOR SHIFTS: CURVE SHIFT DATA (MEASURED DEPTH) BASELINE DEPTH GR 11060.0 11060.0 11063.0 11063.0 EQUIVALENT UNSHIFTED DEPTH 11064.5 11066.0 11068 0 11069 0 11072 0 11077 0 11079 0 11082 5 11087 5 11090 5 11092.0 11092 5 11096 5 11099 0 11101 0 11102 5 11106 5 11108 5 11111 0 11117 5 11120 0 11121 0 11122.5 11124.0 11126.5 11130.0 11131.5 13150.0 $ MERGED PBU MWD MWD MWD MWD MWD MWD MWD MWD $ REMARKS: DATA SOURCE TOOL CODE 11063.5 11065.5 11067.0 11068.0 11070 5 11075 5 11078 5 11082 5 11087 5 11089 0 11090 5 11092 0 11096 0 11098 5 11100 0 11100 5 11104 0 11105 5 11108 5 11117 0 11119 5 11121 0 11122 5 11123 5 11126 0 11129 0 11131 0 13149 5 BIT RUN NO MERGE TOP MERGE BASE 1 11090.0 11130.0 2 11130.0 11138.0 3 11138.0 11146.0 7 11146.0 11256.0 8 11256.0 11413.0 9 11413.0 11700.0 10 11700.0 11985.0 11 11985.0 13148.0 MERGED MAIN PASS. $ Data Format Specification Record Data Record Type .................. 0 Data Specification Block Type ..... 0 Logging Direction ................. Down Optical log depth units ........... Feet Data Reference Point .............. Undefined Frame Spacing ..................... 60 .liN Max frames per record ............. Undefined Absent value ...................... -999.25 Depth Units ....................... Datum Specification Block sub-type...0 Name Service Order Units Size Nsam Rep Code Offset Channel DEPT FT 4 1 68 0 1 ROP MWD FT/H 4 1 68 4 2 GR MWD AAPI 4 1 68 8 3 Name Min Max Mean Nsam DEPT 11060 13150 12105 4181 ROP 0.79 2884.81 99.3497 4118 GR 7.23 169.89 30.833 4124 First Last Reading Reading 11060 13150 11091.5 13150 11060 13121.5 First Reading For Entire File .......... 11060 Last Reading For Entire File ........... 13150 File Trailer Service name ............. STSLIB.001 Service Sub Level Name... Version Number ........... 1.0.0 Date of Generation ....... 98/05/04 Maximum Physical Record..65535 File Type ................ LO Next File Name ........... STSLIB.002 Physical EOF File Header Service name ............. STSLIB.002 Service Sub Level Name... Version Number ........... 1.0.0 Date of Generation ....... 98/05/04 Maximum Physical Record..65535 File Type ................ LO Previous File Name ....... STSLIB.001 Comment Record FILE HEADER FILE NUMBER: 2 RAW MWD Curves and log header data for each bit run in separate files. BIT RUN NUMBER: 1 DEPTH INCREMENT: .5000 FILE SUMMARY VENDOR TOOL CODE START DEPTH STOP DEPTH GR 11060.0 11100.0 ROP 11090.0 11129.5 $ LOG HEADER DATA DATE LOGGED: 22-MAR-98 SOFTWARE SURFACE SOFTWARE VERSION: DOW]WHOLE SOFTWARE VERSION: DATA TYPE (MEMORY OR REAL-TIME): TD DRILLER (FT) : TOP LOG INTERVAL (FT) : BOTTOM LOG INTERVAL (FT) : BIT ROTATING SPEED (RPM) : HOLE INCLINATION (DEG MSC 1.32 PCG 7.20 PCD 3.00 MEMORY 11130.0 11090.0 11130.0 MINIMUM ANGLE: MAXIMUM ANGLE: TOOL STRING (TOP TO BOTTOM) VENDOR TOOL CODE TOOL TYPE NGP NATURAL GAMMA PROBE $ BOREHOLE AND CASING DATA OPEN HOLE BIT SIZE (IN): DRILLER'S CASING DEPTH (FT) : BOREHOLE CONDITIONS MUD TYPE: MUD DENSITY (LB/G) : MUD VISCOSITY (S): MUD PH: MUD CHLORIDES (PPM) : FLUID LOSS (C3): RESISTIVITY (OHFIM) AT TEMPERATURE (DEGF) MUD AT MEASURED TEMPERATURE (MT): MUD AT MAX CIRCULATING TERMPERATURE: MUD FILTRATE AT MT: MUD CAKE AT MT: NEUTRON TOOL MATRIX: MATRIX DENSITY: HOLE CORRECTION (IN): TOOL STANDOFF (IN) : EWR FREQUENCY (HZ) : REMARKS: $ Data Format Specification Record Data Record Type .................. 0 Data Specification Block Type ..... 0 Logging Direction ................. Down Optical log depth units ........... Feet Data Reference Point .............. Undefined Frame Spacing ..................... 60 .liN Max frames per record ............. Undefined Absent value ...................... -999.25 Depth Units ....................... Datum Specification Block sub-type...0 32.8 32.8 TOOL NUMBER PCG 43 3.800 3.8 SEA-WATER .00 .0 .0 0 .0 .000 .000 .000 .000 82.0 .3 Name Service Order Units Size Nsam Rep Code Offset Channel DEPT FT 4 1 68 0 1 GR MWD 1 AAPI 4 1 68 4 2 ROP MWD 1 FT/H 4 1 68 8 3 First Name Min Max Mean Nsam Reading DEPT 11060 11129.5 11094.8 140 11060 GR 17.96 41.53 24.2319 81 11060 ROP 13.76 954 94.9857 80 11090 Last Reading 11129.5 11100 11129.5 First Reading For Entire File .......... 11060 Last Reading For Entire File ........... 11129.5 File Trailer Service name ............. STSLIB.002 Service Sub Level Name... Version Number ........... 1.0.0 Date of Generation ....... 98/05/04 Maximum Physical Record..65535 File Type ................ LO Next File Name ........... STSLIB.003 Physical EOF File Header Service name ............. STSLIB.003 Service Sub Level Name... Version Number ........... 1.0.0 Date of Generation ....... 98/05/04 Maximum Physical Record..65535 File Type ................ LO Previous File Name ....... STSLIB.002 Comment Record FILE HEADER FILE NUMBER: 3 RAW MWD Curves and log header data for each bit run in separate files. BIT RUN NUMBER: 2 DEPTH INCREMENT: .5000 FILE SUMMARY VENDOR TOOL CODE START DEPTH STOP DEPTH GR 11100 . 5 11109 . 5 ROP 11129 . 0 11137 . 0 $ LOG HEADER DATA DATE LOGGED: 22-MAR- 98 SOFTWARE SURFACE SOFTWARE VERSION: DOWNHOLE SOFTWARE VERSION: DATA TYPE (MEMORY OR REAL-TIME): TD DRILLER (FT) : TOP LOG INTERVAL (FT) : BOTTOM LOG INTERVAL (FT) : BIT ROTATING SPEED (RPM) : HOLE INCLINATION (DEG MINIMUM ANGLE: 32.5 MAXIMUM ANGLE: 32.5 TOOL STRING (TOP TO BOTTOM) VENDOR TOOL CODE TOOL TYPE NGP NATURAL GAMMA PROBE $ BOREHOLE AND CASING DATA MSC 1.32 PCG 7.20 PCD 3.00 MEMORY 11138.0 11130.0 11138.0 TOOL NUMBER PCG 43 OPEN HOLE BIT SIZE (IN): DRILLER'S CASING DEPTH (FT) : BOREHOLE CONDITIONS MUD TYPE: MUD DENSITY (LB/G): MUD VISCOSITY (S) : MUD PH: MUD CHLORIDES (PPM) : FLUID LOSS (C3) : RESISTIVITY (OHMM) AT TEMPERATURE (DEGF) MUD AT MEASURED TEMPERATURE (MT): MUD AT MAX CIRCULATING TERMPERATURE: MUD FILTRATE AT MT: MUD CAKE AT MT: NEUTRON TOOL MATRIX: MATRIX DENSITY: HOLE CORRECTION (IN): TOOL STANDOFF (IN) : EWR FREQUENCY (HZ) : REMARKS: $ Data Format Specification Record Data Record Type .................. 0 Data Specification Block Type ..... 0 Logging Direction ................. Down Optical log depth units ........... Feet Data Reference Point .............. Undefined Frame Spacing ..................... 60 .liN Max frames per record ............. Undefined Absent value ...................... -999.25 Depth Units ....................... Datum Specification Block sub-type...0 3.800 3.8 SEA-WATER .00 .0 .0 0 .0 .000 .000 .000 .000 .3 Name Service Order Units Size Nsam Rep Code Offset Channel DEPT FT 4 1 68 0 1 GR MWD 2 AAPI 4 1 68 4 2 ROP MWD 2 FT/H 4 1 68 8 3 79.7 First Name Min Max Mean Nsam Reading DEPT 11100.5 11137 11118.8 74 11100.5 GR 19.83 38.09 26.6089 19 11100.5 ROP 0.79 118.74 31.9935 17 11129 Last Reading 11137 11109.5 11137 First Reading For Entire File .......... 11100.5 Last Reading For Entire File ........... 11137 File Trailer Service name ............. STSLIB.003 Service Sub Level Name... Version Number ........... 1.0.0 Date of Generation ....... 98/05/04 Maximum Physical Record..65535 File Type ................ LO Next File Name ........... STSLIB.004 Physical EOF File Header Service name ............. STSLIB.004 Service Sub Level Name... Version Number ........... 1.0.0 Date of Generation ....... 98/05/04 Maximum Physical Record..65535 File Type ................ LO Previous File Name ....... STSLIB.003 Comment Record FILE HEADER FILE NUMBER: 4 RAW MWD Curves and log header data for each bit run in separate files. BIT RUN NUMBER: 3 DEPTH INCREMENT: .5000 FILE SUMMARY VENDOR TOOL CODE START DEPTH STOP DEPTH GR 11110 . 0 11115 . 5 ROP 11139 . 5 11145 . 5 $ LOG HEADER DATA DATE LOGGED: 23-MAR-98 SOFTWARE SURFACE SOFTWARE VERSION: DOWNHOLE SOFTWARE VERSION: DATA TYPE (MEMORY OR REAL-TIME): TD DRILLER (FT) : TOP LOG INTERVAL (FT): BOTTOM LOG INTERVAL (FT) : BIT ROTATING SPEED (RPM) : HOLE INCLINATION (DEG MINIMUM ANGLE: .0 MAXIMUM ANGLE: .0 MSC 1.32 PCG 7.20 PCD 3.00 MEMORY 11146.0 11138.0 11146.0 TOOL STRING (TOP TO BOTTOM) VENDOR TOOL CODE TOOL TYPE NGP NATURAL GAMMA PROBE $ TOOL NUMBER PCG 43 BOREHOLE AND CASING DATA OPEN HOLE BIT SIZE (IN): DRILLER'S CASING DEPTH (FT) : 3.800 3.8 BOREHOLE CONDITIONS MUD TYPE: MUD DENSITY (LB/G): MUD VISCOSITY (S) : MUD PH: MUD CHLORIDES (PPM) : SEA-WATER .00 .0 .0 0 FLUID LOSS (C3): RESISTIVITY (OHMM) AT TEMPERATURE (DEGF) MUD AT MEASURED TEMPERATURE (MT): MUD AT MAX CIRCULATING TERMPERATURE: MUD FILTRATE AT MT: MUD CAKE AT MT: NEUTRON TOOL MATRIX: MATRIX DENSITY: HOLE CORRECTION (IN): TOOL STANDOFF (IN): EWR FREQUENCY (HZ): REMARKS: $ Data Format Specification Record Data Record Type .................. 0 Data Specification Block Type ..... 0 Logging Direction ................. Down Optical log depth units ........... Feet Data Reference Point .............. Undefined Frame Spacing ..................... 60 .lin Max frames per record ............. Undefined Absent value ...................... -999.25 Depth Units ....................... Datum Specification Block sub-type...0 .0 .000 .000 .000 .000 .3 Name Service Order Units Size Nsam Rep Code Offset Channel DEPT FT 4 1 68 0 1 GR MWD 3 AAPI 4 1 68 4 2 ROP MWD 3 FT/H 4 1 68 8 3 .0 First Name Min Max Mean Nsam Reading DEPT 11110 11145.5 11127.8 72 11110 GR 21.31 23.33 22.2517 12 11110 ROP 8.14 12.86 10.3977 13 11139.5 Last Reading 11145.5 11115.5 11145.5 First Reading For Entire File .......... 11110 Last Reading For Entire File ........... 11145.5 File Trailer Service name ............. STSLIB.004 Service Sub Level Name... Version Number ........... 1.0.0 Date of Generation ....... 98/05/04 Maximum Physical Record..65535 File Type ................ LO Next File Name ........... STSLIB.005 Physical EOF File Header Service name ............. STSLIB.005 Service Sub Level Name... Version Number ........... 1.0.0 Date of Generation ....... 98/05/04 Maximum Physical Record..65535 File Type ................ LO Previous File Name ....... STSLIB.004 Comment Record FILE HEADER FILE NUMBER: 5 RAW MWD Curves and log header data for each bit run in separate files. BIT RUN NUMBER: 7 DEPTH INCREMENT: .5000 FILE SUMMARY VENDOR TOOL CODE START DEPTH STOP DEPTH GR 11117 . 0 11227 . 0 ROP 11145 . 0 11256 . 0 $ LOG HEADER DATA DATE LOGGED: 24-MAR- 98 SOFTWARE SURFACE SOFTWARE VERSION: DOWNHOLE SOFTWARE VERSION: DATA TYPE (MEMORY OR REAL-TIME): TD DRILLER (FT) : TOP LOG INTERVAL (FT) : BOTTOM LOG INTERVAL (FT) : BIT ROTATING SPEED (RPM) : HOLE INCLINATION (DEG MINIMUM ANGLE: 20.0 MAXIMUM ANGLE: 28.8 MSC 1.32 PCG 7.20 PCD 3.00 MEMORY 11256.0 11146.0 11256.0 TOOL STRING (TOP TO BOTTOM) VENDOR TOOL CODE TOOL TYPE NGP NATURAL GAMMA PROBE $ TOOL NUMBER PCG 76 BOREHOLE AND CASING DATA OPEN HOLE BIT SIZE (IN): DRILLER'S CASING DEPTH (FT) : 3.800 3.8 BOREHOLE CONDITIONS MUD TYPE: MUD DENSITY (LB/G): MUD VISCOSITY (S) : MUD PH: MUD CHLORIDES (PPM) : FLUID LOSS (C3) : RESISTIVITY (OHMM) AT TEMPERATURE (DEGF) MUD AT MEASURED TEMPERATURE (MT): MUD AT MAX CIRCULATING TERMPERATURE: MUD FILTRATE AT MT: MUD CAKE AT MT: FLO PRO 8.80 .0 9.5 7.3 .000 .000 .000 .000 56.2 NEUTRON TOOL MATRIX: MATRIX DENSITY: HOLE CORRECTION (IN) : TOOL STANDOFF (IN) : EWR FREQUENCY (HZ) : REMARKS: $ Data Format Specification Record Data Record Type .................. 0 Data Specification Block Type ..... 0 Logging Direction ................. Down Optical log depth units ........... Feet Data Reference Point .............. Undefined Frame Spacing ..................... 60 .liN Max frames per record ............. Undefined Absent value ...................... -999.25 Depth Units ....................... Datum Specification Block sub-type...0 .3 Name Service Order Units Size Nsam Rep Code Offset Channel DEPT FT 4 1 68 0 1 GR MWD 7 AAPI 4 1 68 4 2 ROP MWD 7 FT/H 4 1 68 8 3 First Name Min Max Mean Nsam Reading DEPT 11117 11256 11186.5 279 11117 GR 21.28 146.55 39.3373 221 11117 ROP 10 2239.88 99.2991 223 11145 Last Reading 11256 11227 11256 First Reading For Entire File .......... 11117 Last Reading For Entire File ........... 11256 File Trailer Service name ............. STSLIB.005 Service Sub Level Name... Version Number ........... 1.0.0 Date of Generation ....... 98/05/04 Maximum Physical Record..65535 File Type ................ LO Next File Name ........... STSLIB.006 Physical EOF File Header Service name ............. STSLIB.006 Service Sub Level Name... Version Number ........... 1.0.0 Date of Generation ....... 98/05/04 Maximum Physical Record..65535 File Type ................ LO Previous File Name ....... STSLIB.005 Comment Record FILE HEADER FILE NUMBER: 6 RAW MWD Curves and log header data for each bit run in separate files. BIT RUN NUMBER: 8 DEPTH INCREMENT: .5000 FILE SUMMARY VENDOR TOOL CODE START DEPTH STOP DEPTH GR 11228.0 11384.0 ROP 11257.5 11412.5 $ LOG HEADER DATA DATE LOGGED: 24-MAR-98 SOFTWARE SURFACE SOFTWARE VERSION: DOWNHOLE SOFTWARE VERSION: DATA TYPE (MEMORY OR REAL-TIME): TD DRILLER (FT) : TOP LOG INTERVAL (FT) : BOTTOM LOG INTERVAL (FT) : BIT ROTATING SPEED (RPM): HOLE INCLINATION (DEG MINIMUM ANGLE: 21.8 MAXIMUM ANGLE: 40.1 MSC 1.32 PCG 7.20 PCD 3.00 MEMORY 11413.0 11256.0 11413.0 TOOL STRING (TOP TO BOTTOM) VENDOR TOOL CODE TOOL TYPE NGP NATURAL GAMMA PROBE $ TOOL NUMBER PCG 43 BOREHOLE AND CASING DATA OPEN HOLE BIT SIZE (IN): DRILLER'S CASING DEPTH (FT) : 3.750 3.8 BOREHOLE CONDITIONS MUD TYPE: MUD DENSITY (LB/G): MUD VISCOSITY (S) : MUD PH: MUD CHLORIDES (PPM): FLUID LOSS (C3) : RESISTIVITY (OHMM) AT TEMPERATURE (DEGF) MUD AT MEASURED TEMPERATURE (MT): MUD AT MAX CIRCULATING TERMPERATURE: MUD FILTRATE AT MT: MUD CAKE AT MT: FLO-PRO 8.80 .0 9.2 6.9 .000 .000 .000 .000 60.9 NEUTRON TOOL MATRIX: MATRIX DENSITY: HOLE CORRECTION (IN): TOOL STANDOFF (IN) : EWR FREQUENCY (HZ) : .3 REMARKS: Data Format Specification Record Data Record Type .................. 0 Data Specification Block Type ..... 0 Logging Direction ................. Down Optical log depth units ........... Feet Data Reference Point .............. Undefined Frame Spacing ..................... 60 .liN Max frames per record ............. Undefined Absent value ...................... -999.25 Depth Units ....................... Datum Specification Block sub-type...0 Name Service Order Units Size Nsam Rep Code Offset Channel DEPT FT 4 1 68 0 1 GR MWD 8 AAPI 4 1 68 4 2 ROP MWD 8 FT/H 4 1 68 8 3 First Name Min Max Mean Nsam Reading DEPT 11228 11412.5 11320.2 370 11228 GR 17.42 82.24 27.6788 313 11228 ROP 17.16 130.81 77.3445 311 11257.5 Last Reading 11412.5 11384 11412.5 First Reading For Entire File .......... 11228 Last Reading For Entire File ........... 11412.5 File Trailer Service name ............. STSLIB.006 Service Sub Level Name... Version Number ........... 1.0.0 Date of Generation ....... 98/05/04 Maximum Physical Record..65535 File Type ................ LO Next File Name ........... STSLIB.007 Physical EOF File Header Service name ............. STSLIB.007 Service Sub Level Name... Version Number ........... 1.0.0 Date of Generation ....... 98/05/04 Maximum Physical Record..65535 File Type ................ LO Previous File Name ....... STSLIB.006 Comment Record FILE HEADER FILE NUMBER: 7 RAW MWD Curves and log header data for each bit run in separate files. BIT RUN NUMBER: 9 DEPTH INCREMENT: .5000 FILE SUMMARY VENDOR TOOL CODE START DEPTH GR 11384.5 ROP 11410.0 $ LOG HEADER DATA DATE LOGGED: SOFTWARE SURFACE SOFTWARE VERSION: DOWNHOLE SOFTWARE VERSION: DATA TYPE (MEMORY OR REAL-TIME): TD DRILLER (FT) : TOP LOG INTERVAL (FT) : BOTTOM LOG INTERVAL (FT) : BIT ROTATING SPEED (RPM) : HOLE INCLINATION (DEG MINIMUM ANGLE: MAXIMUM ANGLE: TOOL STRING (TOP TO BOTTOM) VENDOR TOOL CODE TOOL TYPE NGP NATURAL GAMMA PROBE $ BOREHOLE AND CASING DATA OPEN HOLE BIT SIZE (IN): DRILLER'S CASING DEPTH (FT) : BOREHOLE CONDITIONS MUD TYPE: MUD DENSITY (LB/G): MUD VISCOSITY (S) : MUD PH: MUD CHLORIDES (PPM): FLUID LOSS (C3) : RESISTIVITY (OHMM) AT TEMPERATURE (DEGF) MUD AT MEASURED TEMPERATURE (MT): MUD AT MAX CIRCULATING TERMPERATURE: MUD FILTRATE AT MT: MUD CAKE AT MT: NEUTRON TOOL MATRIX: MATRIX DENSITY: HOLE CORRECTION (IN): TOOL STANDOFF (IN) : EWR FREQUENCY (HZ) : REMARKS: $ Data Format Specification Record Data Record Type .................. 0 Data Specification Block Type ..... 0 Logging Direction ................. Down Optical log depth units ........... Feet Data Reference Point .............. Undefined Frame Spacing ..................... 60 .liN Max frames per record ............. Undefined Absent value ...................... -999.25 STOP DEPTH 11671.5 11700.0 25-MAR-98 MSC 1.32 PCG 7.20 PCD 3.00 MEMORY 11700.0 11413.0 11700.0 53.7 86.0 TOOL NUMBER PCG 43 3.750 3.8 FLO-PRO 8.80 .0 8.9 6.8 .000 .000 .000 .000 58.6 .3 Depth Units ....................... Datum Specification Block sub-type...0 Name Service Order Units Size Nsam Rep Code Offset Channel DEPT FT 4 1 68 0 1 GR MWD 9 AAPI 4 1 68 4 2 ROP MWD 9 FT/H 4 1 68 8 3 First Name Min Max Mean Nsaun Reading DEPT 11384.5 11700 11542.2 632 11384.5 GR 14.08 169.89 53.3792 575 11384.5 ROP 24.75 1769.21 104.364 581 11410 Last Reading 11700 11671.5 11700 First Reading For Entire File .......... 11384.5 Last Reading For Entire File ........... 11700 File Trailer Service name ............. STSLIB.007 Service Sub Level Name... Version Number ........... 1.0.0 Date of Generation ....... 98/05/04 Maximum Physical Record..65535 File Type ................ LO Next File Name ........... STSLIB.008 Physical EOF File Header Service name ............. STSLIB.008 Service Sub Level Name... Version Number ........... 1.0.0 Date of Generation ....... 98/05/04 Maximum Physical Record..65535 File Type ................ LO Previous File Name ....... STSLIB.007 Comment Record FILE HEADER FILE NUMBER: 8 RAW MWD Curves and log header data for each bit run in separate files. BIT RUN NUMBER: 10 DEPTH INCREMENT: .5000 FILE SUMMARY VENDOR TOOL CODE START DEPTH STOP DEPTH GR 11672 . 0 11956 . 0 ROP 11700 . 0 11985 . 0 $ LOG HEADER DATA DATE LOGGED: 25-MAR- 98 SOFTWARE SURFACE SOFTWARE VERSION: MSC i. 32 DOWNHOLE SOFTWARE VERSION: DATA TYPE (MEMORY OR REAL-TIME): TD DRILLER (FT): TOP LOG INTERVAL (FT) : BOTTOM LOG INTERVAL (FT) : BIT ROTATING SPEED (RPM) : HOLE INCLINATION (PEG MINIMUM ANGLE: MAXIMUM ANGLE: TOOL STRING (TOP TO BOTTOM) VENDOR TOOL CODE TOOL TYPE NGP NATURAL GAMMA PROBE $ BOREHOLE AND CASING DATA OPEN HOLE BIT SIZE (IN): DRILLER'S CASING DEPTH (FT): BOREHOLE CONDITIONS MUD TYPE: MUD DENSITY (LB/G): MUD VISCOSITY (S): MUD PH: MUD CHLORIDES (PPM): FLUID LOSS (C3) : RESISTIVITY (OHMM) AT TEMPERATURE (DEGF) MUD AT MEASURED TEMPERATURE (MT): MUD AT MAX CIRCULATING TERMPERATURE: MUD FILTRATE AT MT: MUD CAKE AT MT: NEUTRON TOOL MATRIX: MATRIX DENSITY: HOLE CORRECTION (IN): TOOL STANDOFF (IN) : EWR FREQUENCY (HZ) : REMARKS: $ Data Format Specification Record Data Record Type .................. 0 Data Specification Block Type ..... 0 Logging Direction ................. Down Optical log depth units ........... Feet Data Reference Point .............. Undefined Frame Spacing ..................... 60 .liN Max frames per record ............. Undefined Absent value ...................... -999.25 Depth Units ....................... Datum Specification Block sub-type...0 PCG 7.20 PCD 3.00 MEMORY 11985.0 11700.0 11985.0 87.4 91.2 TOOL NUMBER PCG 43 3.750 3.8 FLO-PRO 8.80 .0 9.1 6.9 .000 .000 .000 .000 60.9 .3 Name Service Order Units Size Nsam Rep Code Offset Channel DEPT FT 4 1 68 0 1 GR MWD 10 AAPI 4 1 68 4 2 ROP MWD 10 FT/H 4 1 68 8 3 First Last Name Min Max Mean Nsam Reading Reading DEPT 11672 11985 11828.5 627 11672 11985 GR 17.06 69.54 26.425 569 11672 11956 ROP 45.36 2884.81 122.414 571 11700 11985 First Reading For Entire File .......... 11672 Last Reading For Entire File ........... 11985 File Trailer Service name ............. STSLIB.008 Service Sub Level Name... Version Number ........... 1.0.0 Date of Generation ....... 98/05/04 Maximum Physical Record..65535 File Type ................ LO Next File Name ........... STSLIB.009 Physical EOF File Header Service name ............. STSLIB.009 Service Sub Level Name... Version Number ........... 1.0.0 Date of Generation ....... 98/05/04 Maximum Physical Record..65535 File Type ................ LO Previous File Name ....... STSLIB.008 Comment Record FILE HEADER FILE NUMBER: 9 RAW MWD Curves and log header data for each bit run in separate files. BIT RUN NUMBER: 11 DEPTH INCREMENT: .5000 FILE SUMMARY VENDOR TOOL CODE START DEPTH STOP DEPTH GR 11060 . 0 13121 . 5 ROP 11984 . 0 13149 . 5 $ LOG HEADER DATA DATE LOGGED: 27-MAR- 98 SOFTWARE SURFACE SOFTWARE VERSION: DOWNHOLE SOFTWARE VERSION: DATA TYPE (MEMORY OR REAL-TIME): TD DRILLER (FT) : TOP LOG INTERVAL (FT) : BOTTOM LOG INTERVAL (FT) : BIT ROTATING SPEED (RPM) : HOLE INCLINATION (DEG MINIMUM ANGLE: 86.5 MAXIMUM ANGLE: 93 . 1 MSC 1.32 PCG 7.20 PCD 3.00 MEMORY 13148.0 11985.0 13148.0 TOOL STRING (TOP TO BOTTOM) VENDOR TOOL CODE TOOL TYPE NGP NATURAL GAMMA PROBE $ BOREHOLE AND CASING DATA OPEN HOLE BIT SIZE (IN): DRILLER'S CASING DEPTH (FT) : BOREHOLE CONDITIONS MUD TYPE: MUD DENSITY (LB/G): MUD VISCOSITY (S) : MUD PH: MUD CHLORIDES (PPM) : FLUID LOSS (C3) : RESISTIVITY (OHMM) AT TEMPERATURE (DEGF) MUD AT MEASURED TEMPERATURE (MT): MUD AT MAX CIRCULATING TERMPERATURE: MUD FILTRATE AT MT: MUD CAKE AT MT: NEUTRON TOOL MATRIX: MATRIX DENSITY: HOLE CORRECTION (IN): TOOL STANDOFF (IN): EWR FREQUENCY (HZ) : REMARKS: $ Data Format Specification Record Data Record Type .................. 0 Data Specification Block Type ..... 0 Logging Direction ................. Down Optical log depth units ........... Feet Data Reference Point .............. Undefined Frame Spacing ..................... 60 .liN Max frames per record ............. Undefined Absent value ...................... -999.25 Depth Units ....................... Datum Specification Block sub-type...0 TOOL NUMBER PCG 75 3.750 3.8 FLO- PRO 8.80 .0 9.2 6.7 .000 .000 .000 .000 65.6 .3 Name Service Order Units Size Nsam Rep Code Offset Channel DEPT FT 4 1 68 0 1 GR MWD 11 AAPI 4 1 68 4 2 ROP MWD 11 FT/H 4 1 68 8 3 First Name Min Max Mean Nsam Reading DEPT 11956.5 13149.5 12553 2387 11956.5 GR 7.23 144.89 26.2621 2330 11956.5 ROP 11.17 2235.69 100.475 2332 11984 Last Reading 13149.5 13121 13149.5 First Reading For Entire File .......... 11956.5 Last Reading For Entire File ........... 13149.5 File Trailer Service name ............. STSLIB.009 Service Sub Level Name... Version Number ........... 1.0.0 Date of Generation ....... 98/05/04 Maximum Physical Record..65535 File Type ................ LO Next File Name ........... STSLIB.010 Physical EOF Tape Trailer Service name ............. LISTPE Date ..................... 98/05/04 Origin ................... STS Tape Name ................ UNKNOWN Continuation Number ...... 01 Next Tape Name ........... UNKNOWN Comments ................. STS LIS Writing Library. Technical Services Reel Trailer Service name ............. LISTPE Date ..................... 98/05/04 Origin ................... STS Reel Name ................ UNKNOWN Continuation Number ...... 01 Next Reel Name ........... UNKNOWN Comments ................. STS LIS Writing Library. Technical Services Scientific Scientific Physical EOF Physical EOF End Of LIS File