Department of Commerce, Community, and Economic Development
Alaska Oil and Gas Conservation Commission
Loading...
HomeMy WebLinkAboutO 210Other Order 210
Docket Number: OTH-24-004
1. February 6, 2024 AOGCC notice of proposed enforcement to Hilcorp
2. February 8, 2024 Hilcorp response to notice of proposed enforcement
3. February 8, 2024 Hilcorp revised response to notice of proposed enforcement
4. February 9, 2024 Informal review scheduling
5. -------------------- Email Chain
6. March 22, 2024 Civil penalty payment
(confidential exhibits held in secure storage)
STATE OF ALASKA
ALASKA OIL AND GAS CONSERVATION COMMISSION
333 West Seventh Avenue
Anchorage Alaska 99501
Re: Missing Meter Performance Reports ) Other Order 210
Custody Transfer Meters ) Docket Number: OTH-24-004
Duck Island Unit ) March 5, 2024
DECISION AND ORDER
On June 10, 2022, the Alaska Oil and Gas Conservation Commission (AOGCC) issued a
conditional approval letter for new custody transfer oil measurement equipment at Duck Island
Unit Endicott Main Production Island (Endicott). On February 6, 2024, AOGCC issued a Notice
of Proposed Enforcement Action (Notice) to Hilcorp Alaska, LLC (Hilcorp) regarding Endicott
oil custody transfer meters. The Notice proposed a $55,000 civil penalty under AS 31.05.150(a).
Hilcorp acknowledged receipt of the Notice and requested an informal review of the matter. The
informal review was held February 14, 2024, during which time Hilcorp provided verbal assurance
that corrective actions have been implemented. Hilcorp also responded by letter dated February 8,
2024. In its response, Hilcorp states it “has elected not to appeal docket number OTH-24-004”.
The letter and payment were received by AOGCC on February 19, 2024. Hilcorp provided copies
of the missing reports by emails dated February 19 and February 21, 2024.
Summary of Proposed Enforcement Action:
The Notice identified violations by Hilcorp of the June 10, 2022, conditional approval letter for
new custody transfer oil measurement equipment at Endicott. The Notice proposed a civil penalty
of $55,000 for failure to provide meter performance reports and failing to notify for opportunity
to witness meter proves as specified in the meter approval letter.1 The Notice also proposed that
Hilcorp submit the required information and provide a detailed written explanation that describes
how it intends to prevent recurrence of this violation.
Violation - Failure to Submit Required Custody Transfer Meter Performance Reports:
Replacement of two existing turbine custody transfer meters with Coriolis meters was
conditionally approved by AOGCC on June 10, 2022. Requirements imposed included the meter
prove frequency, notification to AOGCC for opportunity to witness meter proves, required actions
before making changes to the custody transfer measurement equipment, and reporting obligations
following proves.
Condition 5 of the Endicott meter approval letter requires that Hilcorp “provide 24-hour notice to
the AOGCC for opportunity to witness meter proves.” Condition 6 of the Endicott meter approval
letter requires that Hilcorp “provide results of the monthly meter proves within 7 days, including
i. Prove reports;
ii. Batch summaries;
iii. Current meter curve or meter factor control chart with the following fixed control limits
that are used to determine when to initiate recalibration of instruments, inspections,
adjustments, cleaning, or repairing of mechanical equipment, or audits of the measurement
system:
1 The $55,000 civil penalty is comprised of a $10,000 penalty for failure to notify for opportunity to witness meter
proves (2 months; $5,000 each) and a $45,000 penalty for failure to submit meter performance reports (3 months;
$15,000 each).
Other Order 210
March 5, 2024
Page 2 of 4
1. +/-0.15% meter factor deviation between consecutive proves
2. +/-0.25% meter factor deviation between current and baseline proves.”
AOGCC Inspectors witnessed 3 meter proves at Endicott during a trial period demonstration prior
to the Coriolis custody transfer oil meter being placed in routine service.2 The successful
demonstration was completed on October 6, 2023, and associated reports were provided
documenting meter performance. Hilcorp performed the required monthly meter proves at
Endicott in November and December 2023 and January 2024. AOGCC witnessed routine meter
proves in conjunction with a separate visit to Endicott on November 4 and November 14, 2023.
Hilcorp gave notice to AOGCC on November 25, 2023, for opportunity to witness meter proving
at Endicott – AOGCC waived witness that same day. No notice was given for meter proves
occurring in December 2023 and January 2024.
For the months November and December 2023 and January 2024, Hilcorp has only provided meter
prove reports to AOGCC Inspectors at the conclusion of the witnessed meter tests in November.
There were no batch summaries or meter factor control charts provided for the November
witnessed proves. Hilcorp did not provide any of the required reports for the meter proves done
in December 2023 and January 2024.
Mitigating Circumstances:
The factors in AS 31.05.150(g) were considered in determining the appropriate penalty.3
Hilcorp’s lack of good faith in its attempts to comply with the imposed conditions, its history of
regulatory noncompliance and need to deter similar behavior are the factors which most heavily
influence AOGCC’s decision, and the penalty being assessed in this matter:
- The failure to submit information related to meter performance – specifically the meter
factor control charts – cannot be characterized as a good faith attempt to comply with
the AOGCC’s conditional approval letters.
- There is nothing ambiguous about the approval conditions requiring submittal of meter
prove results, and the requirements are consistent with the industry recognized
2 Witnessed meter proves during the trial period demonstration occurred on September 8, 12, and 17, 2023.
3 AS 31.05.150 includes the following factors for consideration in determination of a penalty assessed under this
section.
(1) the extent to which the person committing the violation was acting in good faith in attempting to
comply;
(2) the extent to which the person committing the violation acted in a willful or knowing manner;
(3) the extent and seriousness of the violation and the actual or potential threat to public health or
the environment;
(4) the injury to the public resulting from the violation;
(5) the benefits derived by the person committing the violation from the violation;
(6) the history of compliance or noncompliance by the person committing the violation with the
provisions of this chapter, the regulations adopted under this chapter, and the orders, stipulations,
or terms of permits issued by the commission;
(7) the need to deter similar behavior by the person committing the violation and others similarly
situated at the time of the violation or in the future;
(8) the effort made by the person committing the violation to correct the violation and prevent
future violations; and
(9) other factors considered relevant to the assessment that are adopted by the commission in
regulation.
Other Order 210
March 5, 2024
Page 3 of 4
standardized practices found in API Manual of Petroleum Measurement Standards for
documenting meter performance.4
- The absence of equipment performance tracking information such as the required meter
factor control charts compromises the ability of AOGCC to make informed, fact-based
decisions about how frequently meters should be proved and how frequent those proves
should be witnessed. This information is additionally important for Coriolis meters
which have been approved just once in the past for custody transfer measurement under
AOGCC jurisdiction.
- Hilcorp’s recurring failure to account for approval conditions imposed by AOGCC
calls into question the effectiveness of corrective actions implemented in responses to
past enforcement actions. Specific to the current enforcement, the Endicott
noncompliance is the fifth occurrence of Hilcorp failing to provide required meter
performance reports.5
Mitigating circumstances considered in the assessment of the proposed civil penalty include
Hilcorp’s partial submittal of information to the AOGCC Inspector who witnessed meter proves
in November 2023, the good performance of the meter demonstrated during the trial period, and
no injury to the public beyond failure to comply. Further, AOGCC has not imposed per-day
assessments for the violations, which has significantly reduced the penalty.
Findings and Conclusions:
The AOGCC finds that Hilcorp violated the June 10, 2022, conditional approval letter for the
custody transfer oil meter at Endicott. Mitigating circumstances outlined above were considered
in the Notice and the AOGCC assessment as to the appropriate civil penalty. Hilcorp has neither
disputed the findings in the Notice, nor the penalty proposed by AOGCC. Since receiving the
Notice, Hilcorp has provided the missing performance reports for the meter proves as required in
the conditional approval letter.
Now Therefore It Is Ordered That:
Hilcorp is assessed a civil penalty in the amount of $55,000 for violating the June 10, 2022,
conditional approval letter for the Endicott custody transfer oil measurement equipment.
Hilcorp’s response to the Notice included specific corrective actions to prevent recurrence of this
violation.
As an Operator involved in an enforcement action, Hilcorp is required to preserve documents
concerning the above action until after resolution of the proceeding.
Done at Anchorage, Alaska and Dated March 5, 2024.
Brett W. Huber, Sr. Jessie L. Chmielowski
Chair, Commissioner Commissioner
4 Incorporated by reference into AOGCC regulations at 20 AAC 25.228
5 Refer to Other Orders 113, 153, and 170.
Jessie L.
Chmielowski
Digitally signed by
Jessie L. Chmielowski
Date: 2024.03.05
14:09:05 -09'00'
Brett W.
Huber, Sr.
Digitally signed by
Brett W. Huber, Sr.
Date: 2024.03.05
15:00:04 -09'00'
Other Order 210
March 5, 2024
Page 4 of 4
cc: Phoebe Brooks (AOGCC)
AOGCC Inspectors
RECONSIDERATION AND APPEAL NOTICE
As provided in AS 31.05.080(a), within 20 days after written notice of the entry of this order or decision, or such further
time as the AOGCC grants for good cause shown, a person affected by it may file with the AOGCC an application for
reconsideration of the matter determined by it. If the notice was mailed, then the period of time shall be 23 days. An
application for reconsideration must set out the respect in which the order or decision is believed to be erroneous.
The AOGCC shall grant or refuse the application for reconsideration in whole or in part within 10 days after it is filed.
Failure to act on it within 10-days is a denial of reconsideration. If the AOGCC denies reconsideration, upon denial, this
order or decision and the denial of reconsideration are FINAL and may be appealed to superior court. The appeal MUST
be filed within 33 days after the date on which the AOGCC mails, OR 30 days if the AOGCC otherwise distributes, the
order or decision denying reconsideration, UNLESS the denial is by inaction, in which case the appeal MUST be filed
within 40 days after the date on which the application for reconsideration was filed.
If the AOGCC grants an application for reconsideration, this order or decision does not become final. Rather, the order
or decision on reconsideration will be the FINAL order or decision of the AOGCC, and it may be appealed to superior
court. That appeal MUST be filed within 33 days after the date on which the AOGCC mails, OR 30 days if the AOGCC
otherwise distributes, the order or decision on reconsideration.
In computing a period of time above, the date of the event or default after which the designated period begins to run is
not included in the period; the last day of the period is included, unless it falls on a weekend or state holiday, in which
event the period runs until 5:00 p.m. on the next day that does not fall on a weekend or state holiday.
From:Coldiron, Samantha J (OGC)
To:AOGCC_Public_Notices
Subject:[AOGCC_Public_Notices] Other Order 210 (Hilcorp)
Date:Tuesday, March 5, 2024 3:36:03 PM
Attachments:other 210.pdf
Missing Meter Performance Reports, Custody Transfer Meters, Duck Island Unit
Samantha Coldiron
Special Assistant
Alaska Oil and Gas Conservation Commission
333 West 7th Avenue
Anchorage, AK 99501
(907) 793-1223
__________________________________
List Name: AOGCC_Public_Notices@list.state.ak.us
You subscribed as: samantha.coldiron@alaska.gov
Unsubscribe at:
https://list.state.ak.us/mailman/options/aogcc_public_notices/samantha.coldiron%40alaska.go
v
6
0
Hilcorp Alaska LLC • •' Page 1 of 1
40012563 03/22/2024
INVOICE INVOICE DOCUMENT DISCOUNT AMOUNT
NUMBER DATE NUMBER TAKEN PAID
OTH24004 03/05/2024 19001229380.00 55,000.00
OFTotal 0.00 55,000.00
FOR SECURITY PURPOSES, THE BACK OF THIS DOCUMENT CONTAINS AN ARTIFICIAL WATERMARK
PORTER,PO BOX 61229
/Houston,1'
1940 CHECK NO.
7-4-2033089
PAY Fifty Five Thousand And 0/100 Dollars VOID AFTER 90 DAYS
TO THE ORDER OF:
03/2212024 """ 55,000.00
STATE OF ALASKA
AOGCC 32
333 W 7TH AVE
ANCHORAGE, AK 995013572
AUTHORIZED SIGNATURE
,oHOPH"�� w
„HtSFe;uEO 3 uY�BOH j
OL,20330E19111 1:i13110SBP31: II.0444407748u'
5
1
Regg, James B (OGC)
From:Sara Hannegan <shannegan@hilcorp.com>
Sent:Thursday, February 22, 2024 11:04 AM
To:Regg, James B (OGC); Paul Bishop
Cc:Anthony McConkey; Denali Kemppel; Coldiron, Samantha J (OGC)
Subject:RE: [EXTERNAL] OTH-24-004 - Missing Meter Performance Reports
Attachments:Meter Curve D -09 Sept 2023.pdf
Mr Regg,
Please see the aƩached pdf with the data table and graph separate.
Thank you,
Sara Hannegan
Hilcorp Alaska
OperaƟons Manager – AKI
O: (907) 564‐4624
C: (907) 309‐1196
From: Regg, James B (OGC) <jim.regg@alaska.gov>
Sent: Thursday, February 22, 2024 10:50 AM
To: Sara Hannegan <shannegan@hilcorp.com>; Paul Bishop <Paul.Bishop@hilcorp.com>
Cc: Anthony McConkey <amcconkey@hilcorp.com>; Denali Kemppel <dkemppel@hilcorp.com>; Coldiron, Samantha J
(OGC) <samantha.coldiron@alaska.gov>
Subject: RE: [EXTERNAL] OTH‐24‐004 ‐ Missing Meter Performance Reports
Paul and I have discussed. As for the meter curve sent in an Excel format, the only part of the D meter page that can be
printed is the data table; I need the graph also. Please resend this in a pdf format with the data table and curve on
separate pages.
Jim Regg
Supervisor, Inspections
AOGCC
333 W. 7th Ave, Suite 100
Anchorage, AK 99501
907‐793‐1236
From: Sara Hannegan <shannegan@hilcorp.com>
Sent: Wednesday, February 21, 2024 10:14 AM
To: Regg, James B (OGC) <jim.regg@alaska.gov>
Cc: Anthony McConkey <amcconkey@hilcorp.com>; Denali Kemppel <dkemppel@hilcorp.com>; Coldiron, Samantha J
You don't often get email from shannegan@hilcorp.com. Learn why this is important
CAUTION: External sender. DO NOT open links or attachments from UNKNOWN senders.
Duck Island Unit - EndicottMeters
meter # corrected on data table; jbr
2
(OGC) <samantha.coldiron@alaska.gov>
Subject: RE: [EXTERNAL] OTH‐24‐004 ‐ Missing Meter Performance Reports
Mr. Regg,
Please see the aƩached meter factor chart for the requested dates.
Paul Bishop, our Senior Measurement Specialist in Prudhoe Bay, will be giving you a call to discuss the batch
reports. We currently have them set up as a daily report, not a monthly report. He will be coming out to EndicoƩ to set
them up as monthly reports once the phase 3 weather condiƟons let up.
Thank you,
Sara
From: Regg, James B (OGC) <jim.regg@alaska.gov>
Sent: Tuesday, February 20, 2024 10:43 AM
To: Sara Hannegan <shannegan@hilcorp.com>
Cc: Anthony McConkey <amcconkey@hilcorp.com>; Denali Kemppel <dkemppel@hilcorp.com>; Coldiron, Samantha J
(OGC) <samantha.coldiron@alaska.gov>
Subject: RE: [EXTERNAL] OTH‐24‐004 ‐ Missing Meter Performance Reports
Thank you for Hilcorp’s response and meter prove reports. However, the response is incomplete. Missing are:
‐ batch summaries
‐ meter factor control charts or meter curves updated aŌer the above noted proves.
Jim Regg
Supervisor, Inspections
AOGCC
333 W. 7th Ave, Suite 100
Anchorage, AK 99501
907‐793‐1236
From: Sara Hannegan <shannegan@hilcorp.com>
Sent: Tuesday, February 20, 2024 8:32 AM
To: Coldiron, Samantha J (OGC) <samantha.coldiron@alaska.gov>; Regg, James B (OGC) <jim.regg@alaska.gov>
Cc: Anthony McConkey <amcconkey@hilcorp.com>; Denali Kemppel <dkemppel@hilcorp.com>
Subject: RE: [EXTERNAL] OTH‐24‐004 ‐ Missing Meter Performance Reports
Mr Regg,
Thank you for meeƟng with us last week. Please see the aƩached response and meter prove reports for the dates listed
in Docket Number OTH‐24‐004. Hardcopies will follow.
Thank you,
Sara
You don't often get email from shannegan@hilcorp.com. Learn why this is important
CAUTION: External sender. DO NOT open links or attachments from UNKNOWN senders.
3
From: Coldiron, Samantha J (OGC) <samantha.coldiron@alaska.gov>
Sent: Friday, February 9, 2024 3:03 PM
To: Sara Hannegan <shannegan@hilcorp.com>; Regg, James B (OGC) <jim.regg@alaska.gov>
Cc: Anthony McConkey <amcconkey@hilcorp.com>; Taylor Wellman <twellman@hilcorp.com>
Subject: RE: [EXTERNAL] OTH‐24‐004 ‐ Missing Meter Performance Reports
Thank you, I will send a meeting notice shortly.
Samantha Coldiron
Special Assistant
(907)793-1223
From: Sara Hannegan <shannegan@hilcorp.com>
Sent: Friday, February 9, 2024 3:03 PM
To: Coldiron, Samantha J (OGC) <samantha.coldiron@alaska.gov>; Regg, James B (OGC) <jim.regg@alaska.gov>
Cc: Anthony McConkey <amcconkey@hilcorp.com>; Taylor Wellman <twellman@hilcorp.com>
Subject: RE: [EXTERNAL] OTH‐24‐004 ‐ Missing Meter Performance Reports
Thursday at 1 pm please.
Thank you,
Sara
From: Coldiron, Samantha J (OGC) <samantha.coldiron@alaska.gov>
Sent: Friday, February 9, 2024 2:50 PM
To: Sara Hannegan <shannegan@hilcorp.com>; Regg, James B (OGC) <jim.regg@alaska.gov>
Cc: Anthony McConkey <amcconkey@hilcorp.com>; Taylor Wellman <twellman@hilcorp.com>
Subject: RE: [EXTERNAL] OTH‐24‐004 ‐ Missing Meter Performance Reports
Ms. Hannegan,
Tuesday at 1pm or Thursday at 1pm. Please let me know which works for Hilcorp.
Thank you,
From: Sara Hannegan <shannegan@hilcorp.com>
Sent: Friday, February 9, 2024 1:39 PM
To: Coldiron, Samantha J (OGC) <samantha.coldiron@alaska.gov>; Huber, Brett W (OGC) <brett.huber@alaska.gov>;
Regg, James B (OGC) <jim.regg@alaska.gov>
Cc: Anthony McConkey <amcconkey@hilcorp.com>; Taylor Wellman <twellman@hilcorp.com>
Subject: RE: [EXTERNAL] OTH‐24‐004 ‐ Missing Meter Performance Reports
CAUTION: External sender. DO NOT open links or attachments from UNKNOWN senders.
CAUTION: External sender. DO NOT open links or attachments from UNKNOWN senders.
4
Chairman Huber,
Hilcorp requests the opportunity to hold an informal review of the aƩached NOE.
Please advise us of when would be a convenient Ɵme to hold the review.
Thank you,
Sara Hannegan
Hilcorp Alaska
OperaƟons Manager – Alaska Island Asset
O: (907) 564‐4624
C: (907) 309‐1196
From: Carlisle, Samantha J (OGC) <samantha.carlisle@alaska.gov>
Sent: Tuesday, February 6, 2024 4:02 PM
To: Sara Hannegan <shannegan@hilcorp.com>
Subject: [EXTERNAL] OTH‐24‐004 ‐ Missing Meter Performance Reports
Ms. Hannegan,
Please see attached.
Thank you,
Samantha Carlisle
Special Assistant
Alaska Oil and Gas Conservation Commission
333 West 7th Avenue
Anchorage, AK 99501
(907)793-1223
The information contained in this email message is confidential and may be legally privileged and is intended only for the use of the individual or entity named
above. If you are not an intended recipient or if you have received this message in error, you are hereby notified that any dissemination, distribution, or copy of this
email is strictly prohibited. If you have received this email in error, please immediately notify us by return email or telephone if the sender's phone number is listed
above, then promptly and permanently delete this message.
While all reasonable care has been taken to avoid the transmission of viruses, it is the responsibility of the recipient to ensure that the onward transmission,
opening, or use of this message and any attachments will not adversely affect its systems or data. No responsibility is accepted by the company in this regard and
the recipient should carry out such virus and other checks as it considers appropriate.
The information contained in this email message is confidential and may be legally privileged and is intended only for the use of the individual or entity named
above. If you are not an intended recipient or if you have received this message in error, you are hereby notified that any dissemination, distribution, or copy of this
email is strictly prohibited. If you have received this email in error, please immediately notify us by return email or telephone if the sender's phone number is listed
above, then promptly and permanently delete this message.
CAUTION: This email originated from outside the State of Alaska mail system. Do not click links or open
attachments unless you recognize the sender and know the content is safe.
CAUTION: External sender. DO NOT open links or attachments from UNKNOWN senders.
5
While all reasonable care has been taken to avoid the transmission of viruses, it is the responsibility of the recipient to ensure that the onward transmission,
opening, or use of this message and any attachments will not adversely affect its systems or data. No responsibility is accepted by the company in this regard and
the recipient should carry out such virus and other checks as it considers appropriate.
The information contained in this email message is confidential and may be legally privileged and is intended only for the use of the individual or entity named
above. If you are not an intended recipient or if you have received this message in error, you are hereby notified that any dissemination, distribution, or copy of this
email is strictly prohibited. If you have received this email in error, please immediately notify us by return email or telephone if the sender's phone number is listed
above, then promptly and permanently delete this message.
While all reasonable care has been taken to avoid the transmission of viruses, it is the responsibility of the recipient to ensure that the onward transmission,
opening, or use of this message and any attachments will not adversely affect its systems or data. No responsibility is accepted by the company in this regard and
the recipient should carry out such virus and other checks as it considers appropriate.
The information contained in this email message is confidential and may be legally privileged and is intended only for the use of the individual or entity named
above. If you are not an intended recipient or if you have received this message in error, you are hereby notified that any dissemination, distribution, or copy of this
email is strictly prohibited. If you have received this email in error, please immediately notify us by return email or telephone if the sender's phone number is listed
above, then promptly and permanently delete this message.
While all reasonable care has been taken to avoid the transmission of viruses, it is the responsibility of the recipient to ensure that the onward transmission,
opening, or use of this message and any attachments will not adversely affect its systems or data. No responsibility is accepted by the company in this regard and
the recipient should carry out such virus and other checks as it considers appropriate.
The information contained in this email message is confidential and may be legally privileged and is intended only for the use of the individual or entity named
above. If you are not an intended recipient or if you have received this message in error, you are hereby notified that any dissemination, distribution, or copy of this
email is strictly prohibited. If you have received this email in error, please immediately notify us by return email or telephone if the sender's phone number is listed
above, then promptly and permanently delete this message.
While all reasonable care has been taken to avoid the transmission of viruses, it is the responsibility of the recipient to ensure that the onward transmission,
opening, or use of this message and any attachments will not adversely affect its systems or data. No responsibility is accepted by the company in this regard and
the recipient should carry out such virus and other checks as it considers appropriate.
Meter Curve D -09 Sept 2023.xls
Page 1
0.99500
0.99580
0.99660
0.99740
0.99820
0.99900
0.99980
1.00060
1.00140
1.00220
1.00300
1.00380
75 95 115 135 155 175 195 215 235 255 275 295 315 335 355 375 395 415
Flow Rate
D Meter Comparison
Meter Factor
-0.25%
+0.25%
Comparison
Meter FE-1361D
Meter Comparison
for
FE-1316C
Meter FE-1316D S/N:14024007
Proof Date:
Proof Report
Flow Meter Factor -0.25%+0.25%Comparison Prover Flow
100.104 1.00020 0.9976995 1.0027005 #DIV/0!
187.23500 1.00020 0.9976995 1.0027005 #DIV/0!
257.18301 1.00010 0.99759975 1.00260025 #DIV/0!
09/10/23 294.668 1.00000 0.9975 1.0025 slope:
398.76401 1.00000 0.9975 1.0025 predicted Y
Comparison #DIV/0!Proof Report 1.00010 #DIV/0!
02/17/24 264.97423 Proof Report 2030 1.0001 0.000%
02/10/24 267.987012 Proof Report 2029 1.0001 0.000%
02/03/24 255.209134 Proof Report 1228 0.9999 -0.030% This was proof number 2028
01/27/24 263.524556 Proof Report 2027 1 -0.010%
01/19/24 249.059042 Proof Report 2026 1.0003 0.010%
01/13/24 251.422694 Proof Report 2025 1.0001 -0.010%
01/13/24 #DIV/0!Proof Report 2024 1.0001 #DIV/0! Aborted
01/13/24 #DIV/0!Proof Report 2023 1.0001 #DIV/0! Aborted
01/06/24 270.001966 Proof Report 2022 1.0001 0.000%
01/06/24 #DIV/0!Proof Report 2021 1.0001 #DIV/0! Aborted
12/30/23 265.3841 Proof Report 2020 1.0001 0.000%
12/23/23 252.84231 Proof Report 2019 1 -0.020%
12/16/23 273.414386 Proof Report 2018 1.0002 0.010%
12/11/23 270.426954 Proof Report 2017 1.0001 0.000%
12/10/23 132.0691533 Proof Report 2016 1 -0.020%
12/09/23 274.414384 Proof Report 2015 1.0003 0.020%
12/02/23 274.10262 Proof Report 2014 1.0002 0.010%
11/29/23 273.805932 Proof Report 2013 1.0003 0.020%
11/28/23 273.26784 Proof Report 2012 1.0001 0.000%
11/28/23 #DIV/0!Proof Report 2011 1.0001 #DIV/0! Aborted
11/27/23 #DIV/0!Proof Report 2010 1.0001 #DIV/0! Aborted
11/27/23 #DIV/0!Proof Report 2009 1.0001 #DIV/0! Aborted
11/25/23 277.318678 Proof Report 2008 1.0001 0.000%
11/25/23 #DIV/0!Proof Report 2007 1.0003 #DIV/0! Aborted
11/25/23 #DIV/0!Proof Report 2006 1.0003 #DIV/0! Aborted
11/25/23 #DIV/0!Proof Report 2005 1.0003 #DIV/0! Aborted
11/25/23 #DIV/0!Proof Report 2004 1.0003 #DIV/0! Aborted
11/25/23 #DIV/0!Proof Report 2003 1.0003 #DIV/0! Aborted
11/25/23 #DIV/0!Proof Report 2002 1.0003 #DIV/0! Aborted
11/25/23 #DIV/0!Proof Report 2001 1.0003 #DIV/0! Aborted
11/25/23 #DIV/0!Proof Report 2000 1.0003 #DIV/0! Aborted
11/25/23 #DIV/0!Proof Report 1999 1.0003 #DIV/0! Aborted
11/18/23 276.594038 Proof Report 1998 1.0003 0.020%
11/14/23 264.910546 Proof Report 1997 1.0002 0.010%
11/12/23 240.44478 Proof Report 1996 1.0001 -0.010%
11/12/23 #DIV/0!Proof Report 1995 1.0003 #DIV/0! Aborted
11/12/23 #DIV/0!Proof Report 1994 1.0003 #DIV/0! Aborted
11/12/23 #DIV/0!Proof Report 1993 1.0003 #DIV/0! Aborted
11/04/23 264.699158 Proof Report 1993 1.0003 0.020% Aborted
DateMeter Run
Calibrated:
Rev #37,462
04-13-03
=====FE-1361D jbr; 2/22/22024
=====FE-1361D
1
Regg, James B (OGC)
From:Sara Hannegan <shannegan@hilcorp.com>
Sent:Tuesday, February 20, 2024 8:32 AM
To:Coldiron, Samantha J (OGC); Regg, James B (OGC)
Cc:Anthony McConkey; Denali Kemppel
Subject:RE: [EXTERNAL] OTH-24-004 - Missing Meter Performance Reports
Attachments:AOGCC Docket OTH-24-004 Response.pdf; 11-18-2023 Endicott Meter Proof Report #1998.pdf;
12-16-2023 Endicott Meter Proof Report #2018.pdf; 01-27-2024 Endicott Meter Proof Report #
2027.pdf
Mr Regg,
Thank you for meeƟng with us last week. Please see the aƩached response and meter prove reports for the dates listed
in Docket Number OTH‐24‐004. Hardcopies will follow.
Thank you,
Sara
From: Coldiron, Samantha J (OGC) <samantha.coldiron@alaska.gov>
Sent: Friday, February 9, 2024 3:03 PM
To: Sara Hannegan <shannegan@hilcorp.com>; Regg, James B (OGC) <jim.regg@alaska.gov>
Cc: Anthony McConkey <amcconkey@hilcorp.com>; Taylor Wellman <twellman@hilcorp.com>
Subject: RE: [EXTERNAL] OTH‐24‐004 ‐ Missing Meter Performance Reports
Thank you, I will send a meeting notice shortly.
Samantha Coldiron
Special Assistant
(907)793-1223
From: Sara Hannegan <shannegan@hilcorp.com>
Sent: Friday, February 9, 2024 3:03 PM
To: Coldiron, Samantha J (OGC) <samantha.coldiron@alaska.gov>; Regg, James B (OGC) <jim.regg@alaska.gov>
Cc: Anthony McConkey <amcconkey@hilcorp.com>; Taylor Wellman <twellman@hilcorp.com>
Subject: RE: [EXTERNAL] OTH‐24‐004 ‐ Missing Meter Performance Reports
Thursday at 1 pm please.
Thank you,
Sara
From: Coldiron, Samantha J (OGC) <samantha.coldiron@alaska.gov>
Sent: Friday, February 9, 2024 2:50 PM
CAUTION: External sender. DO NOT open links or attachments from UNKNOWN senders.
J. Regg; 2/20/2024
2
To: Sara Hannegan <shannegan@hilcorp.com>; Regg, James B (OGC) <jim.regg@alaska.gov>
Cc: Anthony McConkey <amcconkey@hilcorp.com>; Taylor Wellman <twellman@hilcorp.com>
Subject: RE: [EXTERNAL] OTH‐24‐004 ‐ Missing Meter Performance Reports
Ms. Hannegan,
Tuesday at 1pm or Thursday at 1pm. Please let me know which works for Hilcorp.
Thank you,
From: Sara Hannegan <shannegan@hilcorp.com>
Sent: Friday, February 9, 2024 1:39 PM
To: Coldiron, Samantha J (OGC) <samantha.coldiron@alaska.gov>; Huber, Brett W (OGC) <brett.huber@alaska.gov>;
Regg, James B (OGC) <jim.regg@alaska.gov>
Cc: Anthony McConkey <amcconkey@hilcorp.com>; Taylor Wellman <twellman@hilcorp.com>
Subject: RE: [EXTERNAL] OTH‐24‐004 ‐ Missing Meter Performance Reports
Chairman Huber,
Hilcorp requests the opportunity to hold an informal review of the aƩached NOE.
Please advise us of when would be a convenient Ɵme to hold the review.
Thank you,
Sara Hannegan
Hilcorp Alaska
OperaƟons Manager – Alaska Island Asset
O: (907) 564‐4624
C: (907) 309‐1196
From: Carlisle, Samantha J (OGC) <samantha.carlisle@alaska.gov>
Sent: Tuesday, February 6, 2024 4:02 PM
To: Sara Hannegan <shannegan@hilcorp.com>
Subject: [EXTERNAL] OTH‐24‐004 ‐ Missing Meter Performance Reports
Ms. Hannegan,
Please see attached.
Thank you,
Samantha Carlisle
CAUTION: External sender. DO NOT open links or attachments from UNKNOWN senders.
CAUTION: This email originated from outside the State of Alaska mail system. Do not click links or open
attachments unless you recognize the sender and know the content is safe.
CAUTION: External sender. DO NOT open links or attachments from UNKNOWN senders.
3
Special Assistant
Alaska Oil and Gas Conservation Commission
333 West 7th Avenue
Anchorage, AK 99501
(907) 793-1223
The information contained in this email message is confidential and may be legally privileged and is intended only for the use of the individual or entity named
above. If you are not an intended recipient or if you have received this message in error, you are hereby notified that any dissemination, distribution, or copy of this
email is strictly prohibited. If you have received this email in error, please immediately notify us by return email or telephone if the sender's phone number is listed
above, then promptly and permanently delete this message.
While all reasonable care has been taken to avoid the transmission of viruses, it is the responsibility of the recipient to ensure that the onward transmission,
opening, or use of this message and any attachments will not adversely affect its systems or data. No responsibility is accepted by the company in this regard and
the recipient should carry out such virus and other checks as it considers appropriate.
The information contained in this email message is confidential and may be legally privileged and is intended only for the use of the individual or entity named
above. If you are not an intended recipient or if you have received this message in error, you are hereby notified that any dissemination, distribution, or copy of this
email is strictly prohibited. If you have received this email in error, please immediately notify us by return email or telephone if the sender's phone number is listed
above, then promptly and permanently delete this message.
While all reasonable care has been taken to avoid the transmission of viruses, it is the responsibility of the recipient to ensure that the onward transmission,
opening, or use of this message and any attachments will not adversely affect its systems or data. No responsibility is accepted by the company in this regard and
the recipient should carry out such virus and other checks as it considers appropriate.
The information contained in this email message is confidential and may be legally privileged and is intended only for the use of the individual or entity named
above. If you are not an intended recipient or if you have received this message in error, you are hereby notified that any dissemination, distribution, or copy of this
email is strictly prohibited. If you have received this email in error, please immediately notify us by return email or telephone if the sender's phone number is listed
above, then promptly and permanently delete this message.
While all reasonable care has been taken to avoid the transmission of viruses, it is the responsibility of the recipient to ensure that the onward transmission,
opening, or use of this message and any attachments will not adversely affect its systems or data. No responsibility is accepted by the company in this regard and
the recipient should carry out such virus and other checks as it considers appropriate.
CAUTION: External sender. DO NOT open links or attachments from UNKNOWN senders.
From:Regg, James B (OGC)
To:Sara Hannegan
Cc:Anthony McConkey; Denali Kemppel; Coldiron, Samantha J (OGC)
Subject:RE: [EXTERNAL] OTH-24-004 - Missing Meter Performance Reports
Date:Tuesday, February 20, 2024 10:43:00 AM
Thank you for Hilcorp’s response and meter prove reports. However, the response is incomplete.
Missing are:
batch summaries
meter factor control charts or meter curves updated after the above noted proves.
Jim Regg
Supervisor, Inspections
AOGCC
333 W. 7th Ave, Suite 100
Anchorage, AK 99501
907-793-1236
From: Sara Hannegan <shannegan@hilcorp.com>
Sent: Tuesday, February 20, 2024 8:32 AM
To: Coldiron, Samantha J (OGC) <samantha.coldiron@alaska.gov>; Regg, James B (OGC)
<jim.regg@alaska.gov>
Cc: Anthony McConkey <amcconkey@hilcorp.com>; Denali Kemppel <dkemppel@hilcorp.com>
Subject: RE: [EXTERNAL] OTH-24-004 - Missing Meter Performance Reports
Mr Regg,
Thank you for meeting with us last week. Please see the attached response and meter prove reports
for the dates listed in Docket Number OTH-24-004. Hardcopies will follow.
Thank you,
Sara
From: Coldiron, Samantha J (OGC) <samantha.coldiron@alaska.gov>
Sent: Friday, February 9, 2024 3:03 PM
To: Sara Hannegan <shannegan@hilcorp.com>; Regg, James B (OGC) <jim.regg@alaska.gov>
Cc: Anthony McConkey <amcconkey@hilcorp.com>; Taylor Wellman <twellman@hilcorp.com>
Subject: RE: [EXTERNAL] OTH-24-004 - Missing Meter Performance Reports
Thank you, I will send a meeting notice shortly.
CAUTION: This email originated from outside the State of Alaska mail system. Do not click links or
open attachments unless you recognize the sender and know the content is safe.
CAUTION: External sender. DO NOT open links or attachments from UNKNOWN senders.
Samantha Coldiron
Special Assistant
(907) 793-1223
From: Sara Hannegan <shannegan@hilcorp.com>
Sent: Friday, February 9, 2024 3:03 PM
To: Coldiron, Samantha J (OGC) <samantha.coldiron@alaska.gov>; Regg, James B (OGC)
<jim.regg@alaska.gov>
Cc: Anthony McConkey <amcconkey@hilcorp.com>; Taylor Wellman <twellman@hilcorp.com>
Subject: RE: [EXTERNAL] OTH-24-004 - Missing Meter Performance Reports
Thursday at 1 pm please.
Thank you,
Sara
From: Coldiron, Samantha J (OGC) <samantha.coldiron@alaska.gov>
Sent: Friday, February 9, 2024 2:50 PM
To: Sara Hannegan <shannegan@hilcorp.com>; Regg, James B (OGC) <jim.regg@alaska.gov>
Cc: Anthony McConkey <amcconkey@hilcorp.com>; Taylor Wellman <twellman@hilcorp.com>
Subject: RE: [EXTERNAL] OTH-24-004 - Missing Meter Performance Reports
Ms. Hannegan,
Tuesday at 1pm or Thursday at 1pm. Please let me know which works for Hilcorp.
Thank you,
From: Sara Hannegan <shannegan@hilcorp.com>
Sent: Friday, February 9, 2024 1:39 PM
To: Coldiron, Samantha J (OGC) <samantha.coldiron@alaska.gov>; Huber, Brett W (OGC)
<brett.huber@alaska.gov>; Regg, James B (OGC) <jim.regg@alaska.gov>
Cc: Anthony McConkey <amcconkey@hilcorp.com>; Taylor Wellman <twellman@hilcorp.com>
Subject: RE: [EXTERNAL] OTH-24-004 - Missing Meter Performance Reports
Chairman Huber,
Hilcorp requests the opportunity to hold an informal review of the attached NOE.
CAUTION: External sender. DO NOT open links or attachments from UNKNOWN senders.
Please advise us of when would be a convenient time to hold the review.
Thank you,
Sara Hannegan
Hilcorp Alaska
Operations Manager – Alaska Island Asset
O: (907) 564-4624
C: (907) 309-1196
From: Carlisle, Samantha J (OGC) <samantha.carlisle@alaska.gov>
Sent: Tuesday, February 6, 2024 4:02 PM
To: Sara Hannegan <shannegan@hilcorp.com>
Subject: [EXTERNAL] OTH-24-004 - Missing Meter Performance Reports
Ms. Hannegan,
Please see attached.
Thank you,
Samantha Carlisle
Special Assistant
Alaska Oil and Gas Conservation Commission
333 West 7th Avenue
Anchorage, AK 99501
(907) 793-1223
The information contained in this email message is confidential and may be legally privileged and is intended only for the use of the
individual or entity named above. If you are not an intended recipient or if you have received this message in error, you are herebynotified that any dissemination, distribution, or copy of this email is strictly prohibited. If you have received this email in error, pleaseimmediately notify us by return email or telephone if the sender's phone number is listed above, then promptly and permanently deletethis message.
While all reasonable care has been taken to avoid the transmission of viruses, it is the responsibility of the recipient to ensure that theonward transmission, opening, or use of this message and any attachments will not adversely affect its systems or data. No responsibilityis accepted by the company in this regard and the recipient should carry out such virus and other checks as it considers appropriate.
The information contained in this email message is confidential and may be legally privileged and is intended only for the use of theindividual or entity named above. If you are not an intended recipient or if you have received this message in error, you are hereby
notified that any dissemination, distribution, or copy of this email is strictly prohibited. If you have received this email in error, please
immediately notify us by return email or telephone if the sender's phone number is listed above, then promptly and permanently delete
this message.
While all reasonable care has been taken to avoid the transmission of viruses, it is the responsibility of the recipient to ensure that theonward transmission, opening, or use of this message and any attachments will not adversely affect its systems or data. No responsibilityis accepted by the company in this regard and the recipient should carry out such virus and other checks as it considers appropriate.
The information contained in this email message is confidential and may be legally privileged and is intended only for the use of theindividual or entity named above. If you are not an intended recipient or if you have received this message in error, you are herebynotified that any dissemination, distribution, or copy of this email is strictly prohibited. If you have received this email in error, pleaseimmediately notify us by return email or telephone if the sender's phone number is listed above, then promptly and permanently deletethis message.
While all reasonable care has been taken to avoid the transmission of viruses, it is the responsibility of the recipient to ensure that the
onward transmission, opening, or use of this message and any attachments will not adversely affect its systems or data. No responsibilityis accepted by the company in this regard and the recipient should carry out such virus and other checks as it considers appropriate.
1
Coldiron, Samantha J (OGC)
From:Walbert Schulpen <wschulpen@hilcorp.com>
Sent:Wednesday, February 7, 2024 10:04 AM
To:Alaska NS - Endicott - Maintenance Leads; Alaska NS - Endicott - Field Foreman; Alaska NS - Endicott
- Operations Leads; Sara Hannegan
Cc:Regg, James B (OGC)
Subject:New Endicott Meter proving requirements
Attachments:Industry Guidance Bulletin 10-01a.pdf
Importance:High
All,
These are the new EndicoƩ meter proving requirements:
1) Meter proving and steps 2) and 3) needs to take place at least once monthly.
2) AOGCC needs at least 24 hours advance noƟce for opportunity to witness. Primary method:
AOGCC.Inspectors@alaska.gov AlternaƟve: 907‐659‐2714
3) Witnessed (AOGCC or our own) prover reports need to be submiƩed to: jim.regg@alaska.gov
Emergency NoƟficaƟons. Emergency situaƟons requiring AOGCC noƟficaƟon should be provided to the AOGCC
InspecƟon Supervisor by phone (907‐793‐1236) during normal business hours or the North Slope Inspector (907‐
659‐2714) aŌer normal business hours.
Walbert Schulpen
Facilities Engineer, Alaska Islands Team
Hilcorp Alaska, LLC
Office: (907) 777-8425
Mobile: (907) 792-9870
The information contained in this email message is confidential and may be legally privileged and is intended only for the use of the individual or entity named
above. If you are not an intended recipient or if you have received this message in error, you are hereby notified that any dissemination, distribution, or copy of this
email is strictly prohibited. If you have received this email in error, please immediately notify us by return email or telephone if the sender's phone number is listed
above, then promptly and permanently delete this message.
While all reasonable care has been taken to avoid the transmission of viruses, it is the responsibility of the recipient to ensure that the onward transmission,
opening, or use of this message and any attachments will not adversely affect its systems or data. No responsibility is accepted by the company in this regard and
the recipient should carry out such virus and other checks as it considers appropriate.
CAUTION: This email originated from outside the State of Alaska mail system. Do not click links or open
attachments unless you recognize the sender and know the content is safe.
CAUTION: This email originated from outside the State of Alaska mail system.
Do not click links or open attachments unless you recognize the sender and know
the content is safe.
From:Regg, James B (OGC)
To:Paul Bishop; DOA AOGCC Prudhoe Bay
Subject:RE: New Endicott metering
Date:Saturday, August 12, 2023 1:01:49 PM
Attachments:image001.png
Make sure you read through the approval letter for these meters. It’s been a year + since the
approval was written.
Jim Regg
Supervisor, Inspections
AOGCC
333 W. 7th Ave, Suite 100
Anchorage, AK 99501
907-793-1236
From: Paul Bishop <Paul.Bishop@hilcorp.com>
Sent: Saturday, August 12, 2023 7:01 AM
To: DOA AOGCC Prudhoe Bay <doa.aogcc.prudhoe.bay@alaska.gov>
Subject: New Endicott metering
Hi all,
It looks like Endicott will be trying to wire up their new Micro-Motion meter today and I am going
out there to help them. I didn’t send out the notification but I will do that now.
And, I might push through some fake pulses to test the meter and they will count on the non-
resettable totals but I’ll take a before and after shot of those to track them.
Call me if you have any questions. Thanks.
Paul Bishop | Sr. Measurement Specialist | Hilcorp North Slope
Office 907-659-8566 | Cell 225-266-1890 | H-3999
The information contained in this email message is confidential and may be legally privileged and is intended only for the use of the
individual or entity named above. If you are not an intended recipient or if you have received this message in error, you are hereby
notified that any dissemination, distribution, or copy of this email is strictly prohibited. If you have received this email in error, pleaseimmediately notify us by return email or telephone if the sender's phone number is listed above, then promptly and permanently deletethis message.
While all reasonable care has been taken to avoid the transmission of viruses, it is the responsibility of the recipient to ensure that theonward transmission, opening, or use of this message and any attachments will not adversely affect its systems or data. No responsibilityis accepted by the company in this regard and the recipient should carry out such virus and other checks as it considers appropriate.
CAUTION: This email originated from outside the State of Alaska mail system. Do not click links or open attachments unless you recognize the sender and know the content is safe.
From:Regg, James B (OGC)
To:Walbert Schulpen; Earl, Adam G (OGC)
Cc:Paul Bishop; Jake Wease - (C); Alaska NS - Endicott - Maintenance Leads; Collin Schafer
Subject:RE: Endicott FT1361D Progress report
Date:Monday, September 11, 2023 2:46:00 PM
Attachments:image001.png
1. Approved to stay on Coriolis 1361D if the meter comparison stays within 0.25%
2. Facility constraints preventing proving at rates above 400 BPH is understood and acceptable
Jim Regg
Supervisor, Inspections
AOGCC
333 W. 7th Ave, Suite 100
Anchorage, AK 99501
907-793-1236
From: Walbert Schulpen <wschulpen@hilcorp.com>
Sent: Monday, September 11, 2023 10:13 AM
To: Earl, Adam G (OGC) <adam.earl@alaska.gov>; Regg, James B (OGC) <jim.regg@alaska.gov>
Cc: Paul Bishop <Paul.Bishop@hilcorp.com>; Jake Wease - (C) <Jake.Wease@hilcorp.com>; Alaska NS - Endicott - Maintenance Leads <AlaskaNS-Endicott-MaintenanceLeads@hilcorp.com>; Collin Schafer <cschafer@hilcorp.com>
Subject: Endicott FT1361D Progress report
Hi Jim and Adam,
Meter curve and comparison
Please find below the meter curve for FT-1361D with the comparison against the prover runs so far. We are really pleased with the performance of the Coriolis meter and the flatness of the curve. We have submitted the prover reports per the
normal channel. We will continue to carry out 1 proof per day for the next 12 days (today included). We may not be able to prove above 400 BBL/Hr due to restrictions in the plant. At the end of the trial period, we will send you an updated curve
with all the comparisons. I would like to request approval to stay on FT1361D, instead of changing back to FT1361C (the turbine meter) if the meter comparison stays within the specified +/-0.25% per our expectations.
Meter Curve D run 2” Coriolis (S/N: 14024007). Flowrate BBL/hour
Configuration file
We looked at the Point Tomson LACT meter (also Micro Motion) config file and updated the damping factors per their settings. While we did pass the prover test with both new and old settings, with the new settings it takes fewer attempts at high
flowrates (400 BBL/Hr). I have attached the latest configuration file. We are not planning to make any additional changes.
Kind regards,
Walbert SchulpenFacilities Engineer, Alaska Islands TeamHilcorp Alaska, LLCOffice: (907) 777-8425Mobile: (907) 792-9870
The information contained in this email message is confidential and may be legally privileged and is intended only for the use of the individual or entity named above. If you are not an intended recipient or if you have received this message in error, you are hereby notified that any dissemination, distribution, or copy of this email is strictlyprohibited. If you have received this email in error, please immediately notify us by return email or telephone if the sender's phone number is listed above, then promptly and permanently delete this message.
While all reasonable care has been taken to avoid the transmission of viruses, it is the responsibility of the recipient to ensure that the onward transmission, opening, or use of this message and any attachments will not adversely affect its systems or data. No responsibility is accepted by the company in this regard and the recipient shouldcarry out such virus and other checks as it considers appropriate.
CAUTION: This email originated from outside the State of Alaska mail system. Do not click links or open attachments unless you recognize the sender and know the content is safe.
From:Walbert Schulpen
To:Regg, James B (OGC); DOA AOGCC Prudhoe Bay
Subject:Endicott FT1361D Progress report
Date:Tuesday, September 19, 2023 3:15:56 PM
Attachments:image001.png
FT1361D 9-14-23.pdf
Some people who received this message don't often get email from wschulpen@hilcorp.com. Learn why this is important
All,
Please find attached the latest meter curve for Endicott FT1361D and the current configuration file. As part of the trial period, we are planning to carry out 2 more days with a daily proof (9/20 and 9/21). I will send you and
updated meter curve, including the last two proofs.
Please confirm that this satisfies the test requirements. Per email received 9/11/2023 we are planning to stay on Endicott FT1361D after the trial completion.
Kind regards,
Walbert
Walbert SchulpenFacilities Engineer, Alaska Islands TeamHilcorp Alaska, LLCOffice: (907) 777-8425Mobile: (907) 792-9870
The information contained in this email message is confidential and may be legally privileged and is intended only for the use of the individual or entity named above. If you are not an intended recipient or if you have received this message in error, you are hereby notified that any dissemination, distribution, orcopy of this email is strictly prohibited. If you have received this email in error, please immediately notify us by return email or telephone if the sender's phone number is listed above, then promptly and permanently delete this message.
While all reasonable care has been taken to avoid the transmission of viruses, it is the responsibility of the recipient to ensure that the onward transmission, opening, or use of this message and any attachments will not adversely affect its systems or data. No responsibility is accepted by the company in thisregard and the recipient should carry out such virus and other checks as it considers appropriate.
Model 2700 with analog outputs-2-FT-1361D
Calibration Data
Device Information
3076253
0
212.444.45
0x1E228
Model 2700 with analog
outputs
0x913
0
M. RESET
Curved Tube
4.3x
FT-1361D
1.00000 g/cm3
Analog I/O
6.80
3076253
Micro Motion, Inc.
0
Micro Motion, Inc.
9/14/2023 5:22:22 PM
1
0
0.00000 g/cm3
Transmitter Identification > Transmitter Serial Number
Flow Calibration Factor > Flow Cal or FCF
Density Calibration Factors > D1
Sensor Type > Sensor Type
Density Calibration Factors > D2
Transmitter Identification > Tag
Transmitter Electronics > Engineer To Order (ETO) Number
Transmitter Identification > Manufacturer
Transmitter Electronics > Hardware Revision
Transmitter Electronics > Software Revision
Transmitter Identification > HART Device ID
Transmitter Identification > Distributor
Transmitter Electronics > Option Board
Transmitter Electronics > Firmware Checksum
Core Processor > Firmware Checksum
Transmitter Identification > Long Tag
Core Processor > Core Processor Serial Number
Core Processor > Engineer To Order (ETO) Number
Core Processor > Core Processor Unique ID
Transmitter Identification > Model
Core Processor > Software Revision
1 of 11Model 2700 with analog outputs-2-FT-1361D
9/14/2023 5:22:22 PM
Transmitter Configuration Report
Configuration
0.00000 Sec
2.40000 Sec
0.78255 barrels/hr
0.00000 g/cm3
barrels/hr
1.00000T.00000
0.20000 g/cm3
0.20000 Sec
5.00000 g/cm3
°F
1.00000
1.00000
g/cm3
Normal
12506.67000 µsec
10526.65000 µsec
kg/min
271.79000
Enabled
Forward
0.00000 sec
1.00000
4.45000
Liquid Volume
Normal - Optimal Filtering
2.07360 kg/min
Process Measurement > Density > Two-Phase Flow > Two-Phase Flow High Limit
Process Measurement > Density > Two-Phase Flow > Two-Phase Flow Low Limit
Density Calibration Factors > K2
Write-Protection > Write-Protection > Write-Protect Transmitter Configuration
Process Measurement > Temperature > General > Temperature Calibration Factor
Density Calibration Factors > K1
Process Measurement > Temperature > General > Temperature Damping
Density Calibration Factors > DT or TC
Density Calibration Factors > FD
Process Measurement > Temperature > General > Temperature Unit
Process Measurement > Response > General > Update Rate
Process Measurement > Flow > Mass Flow Rate > Mass Flow Cutoff
Process Measurement > Density > General > Density Unit
Process Measurement > Flow > Mass Flow Rate > Mass Flow Rate Unit
Process Measurement > Flow > Volume Flow Rate > Volume Flow Rate Meter Factor
Process Measurement > Flow > Volume Flow Rate > Volume Flow Type
Process Measurement > Flow > Volume Flow Rate > Volume Flow Cutoff
Process Measurement > Flow > Mass Flow Rate > Mass Flow Rate Meter Factor
Process Measurement > Density > General > Density Damping
Process Measurement > Flow > Volume Flow Rate > Volume Flow Rate Unit
Process Measurement > Response > General > Response Time
Process Measurement > Density > Two-Phase Flow > Two-Phase Flow Timeout
Process Measurement > Density > General > Density Cutoff
Process Measurement > Flow > General > Flow Direction
Process Measurement > Density > General > Density Meter Factor
Process Measurement > Flow > General > Flow Rate Damping
2 of 11Model 2700 with analog outputs-2-FT-1361D
9/14/2023 5:22:22 PM
Transmitter Configuration Report
15000.00000 Hz
Downscale
1000.00000 Hz
2.00000 mA
Discrete Output
Pulses per Unit
0.00010
360.00000 barrels/hr
10000.00000
Active High
Volume Flow Rate
277.23520 msec
Downscale
0.00000 barrels/hr
0.00000 g/cm3 per PSI
0.00000 PSI
0.00000 barrels/hr
Fixed Value or Digital
Comm.
Disabled
0.00000 % per PSI
32.00000 °F
PSI
500.00000 barrels/hr
Volume Flow Rate
100.00000 Ohms
0.00000 Sec
138.50000 Ohms
Process Measurement > Pressure Compensation > General > Pressure Compensation Status
Process Measurement > Temperature > External RTD - Tag Calibration to Temperature Calibration
Converter > Resistance at 0 °C
Process Measurement > Pressure Compensation > General > Density Factor
I/O > Outputs > Frequency Output > Scaling > Pulses per Unit
I/O > Outputs > Frequency Output > Fault Settings > Fault Action
Process Measurement > Temperature > Line Temperature Data > Source
I/O > Outputs > Frequency Output > Fault Settings > Fault Level
Process Measurement > Temperature > Line Temperature Data > Ext. Temperature
I/O > Outputs > Frequency Output > Scaling > Units per Pulse
I/O > Outputs > Frequency Output > Frequency/Discrete Output > Channel
Process Measurement > Temperature > External RTD - Tag Calibration to Temperature Calibration
Converter > Resistance at 100 °C
I/O > Outputs > Frequency Output > General > Source (Third Variable)
I/O > Outputs > mA Output 1 > mA Output 1 > Upper Range Value
I/O > Outputs > Frequency Output > General > Polarity
I/O > Outputs > mA Output 1 > mA Output 1 > Lower Range Value
I/O > Outputs > mA Output 1 > Fault Settings > Fault Action
I/O > Outputs > mA Output 1 > mA Output 1 > Flow Rate Cutoff
I/O > Outputs > mA Output 1 > Fault Settings > Fault Level
I/O > Outputs > mA Output 1 > mA Output 1 > Added Damping
I/O > Outputs > Frequency Output > Scaling > Frequency Factor
Process Measurement > Pressure Compensation > General > Pressure Unit (Gauge)
I/O > Outputs > Frequency Output > Scaling > Rate Factor
Process Measurement > Pressure Compensation > General > Flow Factor
I/O > Outputs > Frequency Output > General > Maximum Pulse Width
I/O > Outputs > mA Output 1 > mA Output 1 > Source (Primary Variable)
I/O > Outputs > Frequency Output > Scaling > Scaling Method
Process Measurement > Pressure Compensation > General > Flow Calibration Pressure
3 of 11Model 2700 with analog outputs-2-FT-1361D
9/14/2023 5:22:22 PM
Transmitter Configuration Report
None
None
Off
None
Enabled
Drive Gain
None
Active Low
Density
Temperature
10
Mass Flow Rate
None
1.20000 kg/min
None
None
5.00000 %
None
None
Volume Flow Rate
None
None
Enhanced Event 1
English
Event 1
None
None
On
Transmitter Display > Display Variables > Display Variables > Display Variable 6
Transmitter Display > Display Variables > Display Variables > Display Variable 9
I/O > Outputs > Discrete Output > Discrete Output 1 > Source
Transmitter Display > Display Variables > Display Variables > Display Variable 8
I/O > Outputs > Discrete Output > Discrete Output 1 > Polarity
Transmitter Display > Display Variables > Display Variables > Display Variable 7
Transmitter Display > Display Variables > Display Variables > Display Variable 10
Transmitter Display > Display Variables > Display Variables > Display Variable 11
Transmitter Display > General > Display Option > Language
I/O > Outputs > Discrete Output > Flow Switch > Flow Switch Hysteresis
Transmitter Display > General > Backlight > Backlight Status
I/O > Outputs > Discrete Output > Flow Switch > Flow Switch Setpoint
Transmitter Display > General > Backlight > Status LED Blinking
I/O > Action Assignment > Action > Start Sensor Zero
I/O > Action Assignment > Action > Reset Volume Total
I/O > Action Assignment > Action > Reset All Totals
I/O > Action Assignment > Action > Start Meter Verification
I/O > Action Assignment > Action > Start or Stop All Totalizers
Transmitter Display > Display Variables > Display Variables > Display Variable 3
Transmitter Display > Display Variables > Display Variables > Display Variable 2
Transmitter Display > Display Variables > Display Variables > Display Variable 4
Transmitter Display > Display Variables > Display Variables > Display Variable 5
I/O > Outputs > Discrete Output > Discrete Output 1 > Fault Action
Transmitter Display > General > Scroll Option > Scroll Time (1-30 sec)
Transmitter Display > General > Scroll Option > Auto Scroll
Transmitter Display > Display Variables > Display Variables > Display Variable 1
I/O > Outputs > Discrete Output > Flow Switch > Flow Switch Variable
I/O > Action Assignment > Action > Reset Mass Total
4 of 11Model 2700 with analog outputs-2-FT-1361D
9/14/2023 5:22:22 PM
Transmitter Configuration Report
1234
4
4
2
Disabled
4
200 ms
4
4
2
4
4
Disabled
4
4
4
4
None
2
4
None
2
4
4
None
4
None
Transmitter Display > Display Variables > Decimal Places for Diagnostic Variables > Board
Temperature
Transmitter Display > Display Variables > Display Variables > Display Variable 12
Transmitter Display > Display Variables > Decimal Places for Diagnostic Variables > Input Voltage
Transmitter Display > Display Variables > Decimal Places for Totalizer Variables > Volume Total
Transmitter Display > Display Security > Display Security > Offline Menu Security
Transmitter Display > Display Variables > Display Variables > Display Variable 14
Transmitter Display > Display Security > Display Security > Offline Password
Transmitter Display > Display Variables > Display Variables > Display Variable 15
Transmitter Display > Display Variables > Display Refresh Rate > Display Refresh Rate
Transmitter Display > Display Security > Display Security > Alarm Security
Transmitter Display > Display Variables > Display Variables > Display Variable 13
Transmitter Display > Display Variables > Decimal Places for Process Variables > Mass Flow Rate
Transmitter Display > Display Variables > Decimal Places for Diagnostic Variables > Field
Verification Zero
Transmitter Display > Display Variables > Decimal Places for Process Variables > Temperature
Transmitter Display > Display Variables > Decimal Places for Diagnostic Variables > Live Zero Flow
Rate
Transmitter Display > Display Variables > Decimal Places for Process Variables > External Pressure
Transmitter Display > Display Variables > Decimal Places for Process Variables > Drive Gain
Transmitter Display > Display Variables > Decimal Places for Process Variables > External
Temperature
Transmitter Display > Display Variables > Decimal Places for Process Variables > Density
Transmitter Display > Display Variables > Decimal Places for Totalizer Variables > Mass Total
Transmitter Display > Display Variables > Decimal Places for Diagnostic Variables > Meter
Temperature (T-Series)
Transmitter Display > Display Variables > Decimal Places for Totalizer Variables > Volume Inventory
Transmitter Display > Display Variables > Decimal Places for Diagnostic Variables > Left Pickoff
Amplitude
Transmitter Display > Display Variables > Decimal Places for Process Variables > Volume Flow Rate
Transmitter Display > Display Variables > Decimal Places for Diagnostic Variables > Tube Frequency
Transmitter Display > Display Variables > Decimal Places for Totalizer Variables > Mass Inventory
Transmitter Display > Display Variables > Decimal Places for Diagnostic Variables > Right Pickoff
Amplitude
5 of 11Model 2700 with analog outputs-2-FT-1361D
9/14/2023 5:22:22 PM
Transmitter Configuration Report
Fault
Enabled
Fault
Fault
Fault
Fault
Fault
Enabled
Fault
Fault
Fault
Enabled
Fault
Fault
Fault
Fault
Fault
Fault
Fault
Fault
Fault
Fault
Fault
Fault
Enabled
Fault
Fault
Fault
Alert Severity > A021 - Incorrect Sensor Type
Alert Severity > A024 - Program Corrupt (Core Processor)
Transmitter Display > Display Security > Display Security > Operator Access to Offline Menu
Alert Severity > A023 - Internal Totals Corrupt (Core Processor)
Transmitter Display > Display Security > Display Security > Operator Access to Alarm Menu
Alert Severity > A022 - Configuration Database Corrupt (Core Processor)
Alert Severity > A025 - Boot Sector Fault (Core Processor)
Alert Severity > A026 - Sensor/Transmitter Communications Failure
Alert Severity > A010 - Calibration Failure
Alert Severity > A002 - RAM Error (Core Processor)
Alert Severity > A011 - Zero Calibration Failed: Low
Alert Severity > A001 - EEPROM Error (Core Processor)
Alert Severity > A012 - Zero Calibration Failed: High
Alert Severity > A003 - No Sensor Response
Alert Severity > A005 - Mass Flow Rate Overrange
Alert Severity > A006 - Characterization Required
Alert Severity > A009 - Transmitter Initializing/Warming Up
Alert Severity > A008 - Density Overrange
Alert Severity > A018 - EEPROM Error (Transmitter)
Alert Severity > A017 - T-Series RTD Failure
Alert Severity > A019 - RAM Error (Transmitter)
Alert Severity > A020 - No Flow Cal Value
Transmitter Display > Display Security > Display Security > Display Variable Tracks mAO1
Alert Severity > A014 - Transmitter Failure
Alert Severity > A013 - Zero Calibration Failed: Unstable
Alert Severity > A016 - Sensor RTD Failure
Transmitter Display > Ack All > Acknowledge All > Acknowledge All Alerts (Ack All) from Display
Alert Severity > A004 - Temperature Overrange
6 of 11Model 2700 with analog outputs-2-FT-1361D
9/14/2023 5:22:22 PM
Transmitter Configuration Report
A132 - Sensor Simulation
Active
Fault
Fault
Fault
Fault
Fault
Fault
Fault
Fault
Fault
Fault
Fault
Fault
Fault
Fault
2.00000 mA
Fault
Fault
Fault
Fault
Fault
Fault
Fault
Fault
Fault
0 Sec
Downscale
Fault
Alert Severity > A131 Meter Verification in Progress
Fault Processing > General > Fault Timeout
Alert Severity > A028 - Core Processor Write Failure
Alert Severity > Alert Name
Alert Severity > A031 - Low Power
Alert Severity > A132 - Sensor Simulation Active
Fault Processing > mA Output 1 > Fault Action
Fault Processing > mA Output 1 > Fault Level
Alert Severity > A106 - Burst Enabled/AI or AO Simulate Active
Alert Severity > A035 - Meter Verification Aborted
Alert Severity > A107 - Power Reset
Alert Severity > A034 - Meter Verification Failed
Alert Severity > A108 - Basic Event 1 On
Alert Severity > A100 - mA Output 1 Saturated
Alert Severity > A102 - Drive Overrange
Alert Severity > A103 - Data Loss Possible (Totals and Inventories)
Alert Severity > A105 - Two-Phase Flow
Alert Severity > A104 - Calibration in Progress
Alert Severity > A115 - No External Input or Polled Data
Alert Severity > A112 - Upgrade Transmitter Software
Alert Severity > A118 - Discrete Output 1 Fixed
Alert Severity > A119 - Discrete Output 2 Fixed
Alert Severity > A032 - Meter Verification in Progress and Outputs Fixed
Alert Severity > A110 - Frequency Output Saturated
Alert Severity > A109 - Basic Event 2 On
Alert Severity > A111 - Frequency Output Fixed
Alert Severity > A033 - No Right/Left Pickoff Signal
Alert Severity > A101 - mA Output 1 Fixed
7 of 11Model 2700 with analog outputs-2-FT-1361D
9/14/2023 5:22:22 PM
Transmitter Configuration Report
0.00000 g/cm3
None
Less Than Setpoint A
0.00000 g/cm3
Density
0.00000 g/cm3
Density
15000.00000 Hz
Density
Less Than Setpoint A
0.00000 g/cm3
Flow to Zero
Less Than Setpoint A
Density
0.00000 g/cm3
Less Than Setpoint A
Active Low
Density
Density
0.00000 g/cm3
Active Low
0.00000 g/cm3
Less Than Setpoint A
0.00000 g/cm3
Downscale
0.00000 g/cm3
Density
0.00000 g/cm3
Events > Enhanced Events > Enhanced Event 4 > Variable
Events > Enhanced Events > Enhanced Event 4 > Setpoint B
Fault Processing > Frequency Output > Fault Action
Events > Enhanced Events > Enhanced Event 4 > Setpoint A
Fault Processing > Frequency Output > Fault Level
Events > Enhanced Events > Enhanced Event 4 > Type
Events > Enhanced Events > Enhanced Event 5 > Variable
Events > Enhanced Events > Enhanced Event 5 > Type
Events > Enhanced Events > Enhanced Event 1 > Setpoint A
Events > Basic Events > Event 1 > Type
Events > Enhanced Events > Enhanced Event 1 > Setpoint B
Events > Basic Events > Event 1 > Variable
Events > Enhanced Events > Enhanced Event 2 > Variable
Events > Basic Events > Event 1 > Setpoint
Events > Basic Events > Event 2 > Type
Events > Basic Events > Event 2 > Setpoint
Events > Enhanced Events > Enhanced Event 1 > Type
Events > Enhanced Events > Enhanced Event 1 > Variable
Events > Enhanced Events > Enhanced Event 3 > Type
Events > Enhanced Events > Enhanced Event 3 > Variable
Events > Enhanced Events > Enhanced Event 3 > Setpoint A
Events > Enhanced Events > Enhanced Event 3 > Setpoint B
Fault Processing > Discrete Output 1 > Fault Action
Events > Enhanced Events > Enhanced Event 2 > Setpoint A
Events > Enhanced Events > Enhanced Event 2 > Type
Events > Enhanced Events > Enhanced Event 2 > Setpoint B
Fault Processing > Digital Communications > Fault Action
Events > Basic Events > Event 2 > Variable
8 of 11Model 2700 with analog outputs-2-FT-1361D
9/14/2023 5:22:22 PM
Transmitter Configuration Report
19200
Disabled
Process
Variables/Current
3-4 1-2 (MMI Std)
Disabled
2
0 2/3 char time
0.00000 g/cm3
Density
Mass Total
Mass Flow Rate
Enabled
Modbus RTU
Enabled
Volume Flow Rate
14024007
Flow to Zero
Density
0
Temperature
Enabled
0
Volume Flow Rate
Volume Flow Rate
0.00000 g/cm3
None
1
HART 5
Communications > Communications (Modbus) > Modbus Settings > Additional Communications
Response Delay
Communications > RS-485 Terminals > RS-485 Settings > Parity
Events > Enhanced Events > Enhanced Event 5 > Setpoint A
Communications > RS-485 Terminals > RS-485 Settings > Baud Rate
Events > Enhanced Events > Enhanced Event 5 > Setpoint B
Communications > RS-485 Terminals > RS-485 Settings > Protocol
Communications > RS-485 Terminals > RS-485 Settings > Stop Bits
Informational Parameters > Sensor > Sensor Information > Sensor Serial Number
Communications > Communications (HART) > Variable Assignment > Fourth Variable
Communications > Fault Action > Fault Action > Fault Action
Communications > Communications (HART) > HART Burst > HART Universal Mode
Totalizer Control Methods > Totalizer Control Methods > Reset Totalizers via Digital Communications
Communications > Communications (HART) > Burst Mode Status > Burst Mode
Communications > Communications (HART) > General > HART Address
Communications > Communications (HART) > General > mA Output Action
Communications > Communications (HART) > Variable Assignment > Primary Variable
Communications > Communications (HART) > Variable Assignment > Third Variable
Communications > Communications (HART) > Variable Assignment > Secondary Variable
Communications > Communications (HART) > Burst Mode Status > Burst Variable 4
Communications > Communications (HART) > Burst Mode Status > Burst Variable 3
Communications > Communications (Modbus) > Modbus Settings > Modbus Address
Communications > Communications (Modbus) > Modbus Settings > Floating-Point Byte Order
Totalizer Control Methods > Totalizer Control Methods > Start/Stop Totalizers from Display
Communications > Communications (HART) > Burst Mode Status > Burst Variable 1
Communications > Communications (HART) > Burst Mode Status > Burst Option
Communications > Communications (HART) > Burst Mode Status > Burst Variable 2
Totalizer Control Methods > Totalizer Control Methods > Reset Totalizers from Display
Communications > Communications (HART) > General > HART Device ID
9 of 11Model 2700 with analog outputs-2-FT-1361D
9/14/2023 5:22:22 PM
Transmitter Configuration Report
Sensor Simulation
1.20000 g/cm3
1.20000 kg/min
Special
1.20000 kg/min
1.20000 Sec
1.20000 g/cm3
Special
1.20000 kg/min
1.20000 Sec
1.20000 Sec
Special
Sawtooth
Fixed
SSCB20061206
3076253
M. RESET
Sine
CM FIRMWARE 051122
1.20000 °F
FT-1361D
1.20000 g/cm3
Enabled
01/01/2001
3076253
Curved Tube
Temperature > Fixed Value
Density > Period
Density > Maximum
Density > Minimum
Temperature > Period
Informational Parameters > Sensor > Sensor Information > Sensor Material
Temperature > Wave Form
Informational Parameters > Transmitter > Transmitter Information > Descriptor
Informational Parameters > Transmitter > Transmitter Information > Date
Informational Parameters > Transmitter > Transmitter Information > Transmitter Serial Number
Informational Parameters > Transmitter > Transmitter Information > Message
Informational Parameters > Transmitter > Transmitter Information > Long Tag
Informational Parameters > Sensor > Sensor Information > Flange Type
Informational Parameters > Sensor > Sensor Information > Liner Material
Informational Parameters > Transmitter > Transmitter Information > Tag
Informational Parameters > Sensor > Sensor Information > Sensor Type
Mass Flow Rate > Maximum
Mass Flow Rate > Minimum
Density > Fixed Value
Density > Wave Form
Mass Flow Rate > Period
Sensor Simulation > Sensor Simulation Status
Informational Parameters > Transmitter > Core Processor > Core Processor Serial Number
Mass Flow Rate > Fixed Value
Mass Flow Rate > Wave Form
10 of 11Model 2700 with analog outputs-2-FT-1361D
9/14/2023 5:22:22 PM
Transmitter Configuration Report
1.20000 °F
1.20000 °FTemperature > Minimum
Temperature > Maximum
11 of 11Model 2700 with analog outputs-2-FT-1361D
9/14/2023 5:22:22 PM
Transmitter Configuration Report
CAUTION: This email originated from outside the State of Alaska mail system. Do not
click links or open attachments unless you recognize the sender and know the content
is safe.
From:Walbert Schulpen
To:Regg, James B (OGC)
Cc:DOA AOGCC Prudhoe Bay
Subject:Final - Endicott FT1361D Progress report
Date:Friday, October 6, 2023 7:37:09 AM
Attachments:2023-10-06 06_56_02-Meter Curve D.png
Some people who received this message don't often get email from wschulpen@hilcorp.com. Learn why this isimportant
Hi Jim,
Please find attached the meter curve for FT1361D, with all meter proves do date. The meter
continues to operate within its design parameters. There is currently a lot of repair activity ongoing, I
expect we would install FT1361A (3” Coriolis) in the course of next year. This concludes our trial
period. Please let me know if you have any other questions about FT1361D flow meter.
Kind regards,
Walbert SchulpenFacilities Engineer, Alaska Islands TeamHilcorp Alaska, LLCOffice: (907) 777-8425Mobile: (907) 792-9870
The information contained in this email message is confidential and may be legally privileged and is intended only for the use of theindividual or entity named above. If you are not an intended recipient or if you have received this message in error, you are herebynotified that any dissemination, distribution, or copy of this email is strictly prohibited. If you have received this email in error, pleaseimmediately notify us by return email or telephone if the sender's phone number is listed above, then promptly and permanently deletethis message.
While all reasonable care has been taken to avoid the transmission of viruses, it is the responsibility of the recipient to ensure that theonward transmission, opening, or use of this message and any attachments will not adversely affect its systems or data. No responsibilityis accepted by the company in this regard and the recipient should carry out such virus and other checks as it considers appropriate.
Meter Comparison
for
FE-1316C
Meter FE-1316D S/N:14024007
Proof Date:
Proof Report
Flow Meter Factor -0.25%+0.25%Comparison Prover Flow
100.104 1.00020 0.9976995 1.0027005 #DIV/0!
187.23500 1.00020 0.9976995 1.0027005 #DIV/0!#DIV/0!#NAME?
257.18301 1.00010 0.99759975 1.00260025 #DIV/0!#DIV/0!
09/10/23 294.668 1.00000 0.9975 1.0025 slope:
398.76401 1.00000 0.9975 1.0025 predicted Y #DIV/0!
Comparison #DIV/0!Proof Report 1.00010 #DIV/0!
02/17/24 264.97423 Proof Report 2030 1.0001 0.000%
02/10/24 267.987012 Proof Report 2029 1.0001 0.000%
02/03/24 255.209134 Proof Report 1228 0.9999 -0.030% This was proof number 2028
01/27/24 263.524556 Proof Report 2027 1 -0.010%
01/19/24 249.059042 Proof Report 2026 1.0003 0.010%
01/13/24 251.422694 Proof Report 2025 1.0001 -0.010%
01/13/24 #DIV/0!Proof Report 2024 1.0001 #DIV/0!Aborted
01/13/24 #DIV/0!Proof Report 2023 1.0001 #DIV/0!Aborted
01/06/24 270.001966 Proof Report 2022 1.0001 0.000%
01/06/24 #DIV/0!Proof Report 2021 1.0001 #DIV/0!Aborted
12/30/23 265.3841 Proof Report 2020 1.0001 0.000%
12/23/23 252.84231 Proof Report 2019 1 -0.020%
12/16/23 273.414386 Proof Report 2018 1.0002 0.010%
12/11/23 270.426954 Proof Report 2017 1.0001 0.000%
12/10/23 132.0691533 Proof Report 2016 1 -0.020%
12/09/23 274.414384 Proof Report 2015 1.0003 0.020%
12/02/23 274.10262 Proof Report 2014 1.0002 0.010%
11/29/23 273.805932 Proof Report 2013 1.0003 0.020%
11/28/23 273.26784 Proof Report 2012 1.0001 0.000%
11/28/23 #DIV/0!Proof Report 2011 1.0001 #DIV/0!Aborted
11/27/23 #DIV/0!Proof Report 2010 1.0001 #DIV/0!Aborted
11/27/23 #DIV/0!Proof Report 2009 1.0001 #DIV/0!Aborted
11/25/23 277.318678 Proof Report 2008 1.0001 0.000%
11/25/23 #DIV/0!Proof Report 2007 1.0003 #DIV/0!Aborted
11/25/23 #DIV/0!Proof Report 2006 1.0003 #DIV/0!Aborted
11/25/23 #DIV/0!Proof Report 2005 1.0003 #DIV/0!Aborted
11/25/23 #DIV/0!Proof Report 2004 1.0003 #DIV/0!Aborted
11/25/23 #DIV/0!Proof Report 2003 1.0003 #DIV/0!Aborted
11/25/23 #DIV/0!Proof Report 2002 1.0003 #DIV/0!Aborted
11/25/23 #DIV/0!Proof Report 2001 1.0003 #DIV/0!Aborted
11/25/23 #DIV/0!Proof Report 2000 1.0003 #DIV/0!Aborted
11/25/23 #DIV/0!Proof Report 1999 1.0003 #DIV/0!Aborted
11/18/23 276.594038 Proof Report 1998 1.0003 0.020%
11/14/23 264.910546 Proof Report 1997 1.0002 0.010%
11/12/23 240.44478 Proof Report 1996 1.0001 -0.010%
11/12/23 #DIV/0!Proof Report 1995 1.0003 #DIV/0!Aborted
11/12/23 #DIV/0!Proof Report 1994 1.0003 #DIV/0!Aborted
11/12/23 #DIV/0!Proof Report 1993 1.0003 #DIV/0!Aborted
11/04/23 264.699158 Proof Report 1993 1.0003 0.020% Aborted
0.99500
0.99580
0.99660
0.99740
0.99820
0.99900
0.99980
1.00060
1.00140
1.00220
1.00300
1.00380
75 95 115 135 155 175 195 215 235 255 275 295 315 335 355 375 395 415
Flow Rate
D Meter Comparison
Meter Factor
-0.25%
+0.25%
Comparison
DateMeter Run
Calibrated:
Rev #37,462
04-13-03
333 West Seventh Avenue
Anchorage, Alaska 99501-3572
Main: 907.279.1433
Fax: 907.276.7542
www.aogcc.alaska.gov
June 10, 2022
Mr. Walbert Schulpen
Facility Engineer, Endicott
Hilcorp Alaska LLC
P.O. Box 244027
Anchorage, AK 99524-4027
Re: Docket Number: OTH-22-006
LACT Skid Downsize
Duck Island Unit
Dear Mr. Schulpen:
In accordance with 20 AAC 25.228(b), Hilcorp Alaska LLC (Hilcorp) submitted to the Alaska Oil
and Gas Conservation Commission (AOGCC) a request to downsize and replace two of the four
Duck Island Unit oil custody transfer meters. The meters are located within Module 303 on the
Endicott Field Main Production Island (Endicott). Hilcorp’s request includes replacing two
existing out-of-service 4-inch turbine meters with two Emerson Micro Motion Elite Coriolis
meters – one 2-inch and one 3-inch. The Coriolis meters will be the primary oil custody transfer
measurement points for Duck Island Unit production. The two remaining 3-inch turbine meters
within the oil measurement skid will be retained as spares. Except for some piping and electrical
wiring necessary to optimize the Coriolis position within the skid for measurement, there are no
other changes proposed.
Use of Coriolis meters for custody transfer measurement requires a variance.1 Hilcorp references
performance data from the Point Thomson Unit meter system as support for use of the Coriolis
meters at Endicott. Hilcorp references no other experience or data for Coriolis meters in custody
transfer measurement service. To gain acceptance of the Coriolis meter for use at Endicott, Hilcorp
has proposed a one-month demonstration where the Coriolis meters’ performance will be
compared to the existing 3-inch turbine meters’ performance. Installation of the Coriolis meters at
Endicott is scheduled to occur beginning the last week of June 2022.
The following equipment comprises the proposed Endicott custody transfer meter system:
1 AOGCC regulation 20 AAC 25.228 incorporates by reference API Manual of Petroleum Measurement Standards,
as revised November 30, 1998; this version does not address Coriolis meters. The 2002 version of API Manual of
Petroleum Measurement Standards, Section 5.6, recognizes Coriolis meters for custody transfer. The standard for
granting a variance is found in 20 AAC 25.228(j).
Docket Number: OTH-22-006
June 10, 2022
Page 2 of 4
- Meters: Coriolis (2) and Turbine (2) meters installeddownstream of production processing
equipment and prior to entering the oil export pipeline;
Meter Model Size Serial # Transmitter
Serial #
Tag #
Micro Motion
Elite Coriolis
CMF 300 3-inch 14023163 3078208 FE-1361A
Micro Motion
Elite Coriolis
CMF 200 2-inch 14024007 3076253 FE-1361D
Smith MV Series
Turbine
K2VEDLUXA0X 3-inch T654688875 FE-1361B
Smith MV Series
Turbine
K2VEDLUXA0X 3-inch T654688874 FE-1361C
- Meter Prover: 8-inch Maloney Unidirectional sphere displacer pipe prover; existing. The
last prover volume certification (water draw method) occurred on 8/23/2021 giving a new
prover volume of 4.533273 barrels.
- Flow Computer: Emerson Process ROC 800 Series; existing; no changes. Pulses per barrel
will be used by the Coriolis meters to communicate to the flow computer.
AOGCC approves Hilcorp’s request to downsize the Duck Island Unit oil custody transfer meters
and replace 2 of the 4 existing turbine meters with Micro Motion Elite Coriolis meters subject to
the following conditions:
1. Hilcorp must demonstrate a performance level acceptable to AOGCC before the Coriolis
meters are used as the primary custody transfer meters.
2. The Duck Island Unit custody transfer measurement system must include the equipment as
described in Hilcorp’s application dated February 2, 2022. Before changes are made to the
custody transfer measurement equipment or measurement methodology Hilcorp must
demonstrate conformance of the proposed changes and obtain AOGCC approval.
3. Hilcorp must provide AOGCC the opportunity to witness
a. custody transfer meter system inspections scheduled to occur prior to initial start-
up and prior to restart after repairs;
b. routine meter proves;
c. building new curves for the custody transfer meters; and
d. calibrations of the transmitters that are part of the custody flow measurement
system.
4. If the AOGCC opts not to witness a prove Hilcorp must still conduct the prove.
5. After demonstrating an acceptable level of performance from the demonstration period,
Hilcorp must prove the custody transfer meter(s) at least monthly. Flow conditions must
be stable at the time of the prove. If production is not stable at the time the monthly prove
is scheduled to occur a prove must be conducted as soon thereafter as the flow is stabilized.
Hilcorp must provide 24-hour notice to the AOGCC for opportunity to witness meter
proves. AOGCC Industry Guidance Bulletin 10-01A delineates notification procedures
and contacts (copy attached). The following information shall be available for AOGCC
inspection at the time of a meter prove:
a. Data download from the flow computer that includes flow parameter configuration,
measured flow volumes, and alarm history (meter system alarms only);
Docket Number: OTH-22-006
June 10, 2022
Page 3 of 4
b. Calibration records for all metering instrumentation;
c. Up-to-date historic trend of meter factors;
d. Density verifications;
e. Record of zero verifications and zero calibrations of the Coriolis meters conducted
during pipeline shutdowns or line pauses at or near process conditions.
6. Hilcorp must provide results of the monthly meter proves within 7 days, including
a. Prove reports;
b. Batch summaries;
c. Current meter curve or meter factor control chart
2 with the following fixed control
limits that are used to determine when to initiate recalibration of instruments,
inspections, adjustments, cleaning, or repairing of mechanical equipment, or audits
of the measurement system:
i. +/-0.15% meter factor deviation between consecutive proves
ii. +/-0.25% meter factor deviation between current and baseline proves
7. Hilcorp must perform quarterly density verifications of crude oil samples by one of the
following methods: online densitometer; laboratory determination; pycnometer; or
hydrometer.
8. Prover volume certifications shall be performed at the earlier occurrence of maintenance
which may affect the prover’s base volume, every 3 years, and when the certified prover
volume changes more than 0.02%. Hilcorp must provide 48-hour notice to the AOGCC for
opportunity to witness prover calibrations.
9. Surface commingling of production from outside the Duck Island Unit upstream of the
metering system approved in this letter is prohibited without written authorization from
AOGCC.
10. There shall be no allocation of water to custody transfer metered volumes from Duck Island
Unit.
If you have any questions on this approval please contact Jim Regg at jim.regg@alaska.gov or
907-793-1236.
Sincerely,
Jeremy M. Price Jessie L. Chmielowski
Chair, Commissioner Commissioner
cc: AOGCC Inspectors
Phoebe Brooks
2 Refer to API Manual of Petroleum Measurement Standards (MPMS), Chapter 13.2, “Methods of Evaluating Meter
Proving Data”
Jessie L.
Chmielowski
Digitally signed by
Jessie L. Chmielowski
Date: 2022.06.10
11:00:49 -08'00'
Jeremy
Price
Digitally signed by
Jeremy Price
Date: 2022.06.14
11:59:37 -08'00'
Docket Number: OTH-22-006
June 10, 2022
Page 4 of 4
RECONSIDERATION AND APPEAL NOTICE
As provided in AS 31.05.080(a), within 20 days after written notice of the entry of this order or decision, or such further time as the
AOGCC grants for good cause shown, a person affected by it may file with the AOGCC an application for reconsideration of the matter
determined by it. If the notice was mailed, then the period of time shall be 23 days. An application for reconsideration must set out the
respect in which the order or decision is believed to be erroneous.
The AOGCC shall grant or refuse the application for reconsideration in whole or in part within 10 days after it is filed. Failure to act
on it within 10-days is a denial of reconsideration. If the AOGCC denies reconsideration, upon denial, this order or decision and the
denial of reconsideration are FINAL and may be appealed to superior court. The appeal MUST be filed within 33 days after the date
on which the AOGCC mails, OR 30 days if the AOGCC otherwise distributes, the order or decision denying reconsideration, UNLESS
the denial is by inaction, in which case the appeal MUST be filed within 40 days after the date on which the application for
reconsideration was filed.
If the AOGCC grants an application for reconsideration, this order or decision does not become final. Rather, the order or decision on
reconsideration will be the FINAL order or decision of the AOGCC, and it may be appealed to superior court. That appeal MUST be
filed within 33 days after the date on which the AOGCC mails, OR 30 days if the AOGCC otherwise distributes, the order or decision
on reconsideration.
In computing a period of time above, the date of the event or default after which the designated period begins to run is not included in
the period; the last day of the period is included, unless it falls on a weekend or state holiday, in which event the period runs until 5:00
p.m. on the next day that does not fall on a weekend or state holiday.
4
CAUTION: This email originated from outside the State of Alaska mail system.
Do not click links or open attachments unless you recognize the sender and know
the content is safe.
CAUTION: External sender. DO NOT open links or attachments from UNKNOWN senders.
From:Sara Hannegan
To:Coldiron, Samantha J (OGC); Regg, James B (OGC)
Cc:Anthony McConkey; Taylor Wellman
Subject:RE: [EXTERNAL] OTH-24-004 - Missing Meter Performance Reports
Date:Friday, February 9, 2024 3:02:48 PM
Thursday at 1 pm please.
Thank you,
Sara
From: Coldiron, Samantha J (OGC) <samantha.coldiron@alaska.gov>
Sent: Friday, February 9, 2024 2:50 PM
To: Sara Hannegan <shannegan@hilcorp.com>; Regg, James B (OGC) <jim.regg@alaska.gov>
Cc: Anthony McConkey <amcconkey@hilcorp.com>; Taylor Wellman <twellman@hilcorp.com>
Subject: RE: [EXTERNAL] OTH-24-004 - Missing Meter Performance Reports
Ms. Hannegan,
Tuesday at 1pm or Thursday at 1pm. Please let me know which works for Hilcorp.
Thank you,
From: Sara Hannegan <shannegan@hilcorp.com>
Sent: Friday, February 9, 2024 1:39 PM
To: Coldiron, Samantha J (OGC) <samantha.coldiron@alaska.gov>; Huber, Brett W (OGC)
<brett.huber@alaska.gov>; Regg, James B (OGC) <jim.regg@alaska.gov>
Cc: Anthony McConkey <amcconkey@hilcorp.com>; Taylor Wellman <twellman@hilcorp.com>
Subject: RE: [EXTERNAL] OTH-24-004 - Missing Meter Performance Reports
Chairman Huber,
Hilcorp requests the opportunity to hold an informal review of the attached NOE.
Please advise us of when would be a convenient time to hold the review.
Thank you,
Sara Hannegan
CAUTION: External sender. DO NOT open links or attachments from UNKNOWN senders.
Hilcorp Alaska
Operations Manager – Alaska Island Asset
O: (907) 564-4624
C: (907) 309-1196
From: Carlisle, Samantha J (OGC) <samantha.carlisle@alaska.gov>
Sent: Tuesday, February 6, 2024 4:02 PM
To: Sara Hannegan <shannegan@hilcorp.com>
Subject: [EXTERNAL] OTH-24-004 - Missing Meter Performance Reports
Ms. Hannegan,
Please see attached.
Thank you,
Samantha Carlisle
Special Assistant
Alaska Oil and Gas Conservation Commission
333 West 7th Avenue
Anchorage, AK 99501
(907) 793-1223
The information contained in this email message is confidential and may be legally privileged and is intended only for the use of the
individual or entity named above. If you are not an intended recipient or if you have received this message in error, you are hereby
notified that any dissemination, distribution, or copy of this email is strictly prohibited. If you have received this email in error, please
immediately notify us by return email or telephone if the sender's phone number is listed above, then promptly and permanently deletethis message.
While all reasonable care has been taken to avoid the transmission of viruses, it is the responsibility of the recipient to ensure that theonward transmission, opening, or use of this message and any attachments will not adversely affect its systems or data. No responsibilityis accepted by the company in this regard and the recipient should carry out such virus and other checks as it considers appropriate.
The information contained in this email message is confidential and may be legally privileged and is intended only for the use of theindividual or entity named above. If you are not an intended recipient or if you have received this message in error, you are herebynotified that any dissemination, distribution, or copy of this email is strictly prohibited. If you have received this email in error, pleaseimmediately notify us by return email or telephone if the sender's phone number is listed above, then promptly and permanently delete
this message.
While all reasonable care has been taken to avoid the transmission of viruses, it is the responsibility of the recipient to ensure that theonward transmission, opening, or use of this message and any attachments will not adversely affect its systems or data. No responsibilityis accepted by the company in this regard and the recipient should carry out such virus and other checks as it considers appropriate.
3
Docket Number OTH-24-004
February 8, 2024
Page 1 of 2
Sara Hannegan
OperaƟons Manager – Alaska Islands
3800 Centerpoint Drive
Suite 1400
Anchorage, AK 99503
Phone: (907) 309-1196
February 8, 2024 shannegan@hilcorp.com
AOGCC Commissioners
Alaska Oil & Gas ConservaƟon Commission
333 West Seventh Avenue, Suite 100
Anchorage, AK 99501-3572
Re: Docket Number: OTH-24-004
NoƟce of Proposed Enforcement AcƟon
Missing Meter Performance Reports
Duck Island Unit
Dear Commissioners,
Hilcorp Alaska, LLC (“Hilcorp”) responds to Alaska Oil and Gas ConservaƟon Commission (AOGCC) Docket
Number OTH-24-004 regarding the failure to provide 24-hour advance noƟce to the AOGCC for the
opportunity to witness the monthly meter prove and to submit required meter performance reports
within 7 days of the prove, dated February 6th, 2024.
Hilcorp has elected not to appeal docket number OTH-24-004 and is submiƫng payment of the civil
penalty for violaƟng the June 10, 2022 condiƟonal approval leƩer for the EndicoƩ Field Main ProducƟon
Island (EndicoƩ) oil custody transfer meters.
PrevenƟon Measures to Prevent Recurrence of ViolaƟon
We are taking this violaƟon seriously and are acƟvely working to ensure it does not recur. The below
acƟons and measures that EndicoƩ has implemented to prevent recurrence of a metering violaƟon are
listed below:
1. Added all CondiƟons Of Approval (COA’s) for oil custody transfer meters to Compliance Task
Manager system to trigger noƟficaƟons to submit 24 hour noƟce and subsequent reports bi-
weekly.
2. Management of Change (MOC) Pre-Start up Safety Review (PSSR) will be held on all MOC’s going
forward to ensure all parƟes are aware of COA’s.
3. A paper copy of the COA’s will be aƩached to new equipment before start up to flag COA’s.
If you have an addiƟonal quesƟons, please contact me.
By Samantha Coldiron at 1:57 pm, Mar 05, 2024
Docket Number OTH-24-004
February 8, 2024
Page 2 of 2
Sincerely,
HILCORP ALASKA, LLC
Sara Hannegan
OperaƟons Manager – Alaska Islands Team
Cc: Anthony McConkey, Asset Team Lead, Alaska Islands
Denali Kemppel, General Counsel
Digitally signed by Sara
Hannegan (2519)
DN: cn=Sara Hannegan (2519)
Date: 2024.02.20 08:47:57 -
09'00'
Sara Hannegan
(2519)
2
Docket Number OTH-24-004
February 8, 2024
Page 1 of 2
Sara Hannegan
OperaƟons Manager – Alaska Islands
3800 Centerpoint Drive
Suite 1400
Anchorage, AK 99503
Phone: (907) 309-1196
February 8, 2024 shannegan@hilcorp.com
AOGCC Commissioners
Alaska Oil & Gas ConservaƟon Commission
333 West Seventh Avenue, Suite 100
Anchorage, AK 99501-3572
Re: Docket Number: OTH-24-004
NoƟce of Proposed Enforcement AcƟon
Missing Meter Performance Reports
Duck Island Unit
Dear Commissioners,
Hilcorp Alaska, LLC (“Hilcorp”) responds to Alaska Oil and Gas ConservaƟon Commission (AOGCC) Docket
Number OTH-24-004 regarding the failure to provide 24-hour advance noƟce to the AOGCC for the
opportunity to witness the monthly meter prove and to submit required meter performance reports
within 7 days of the prove, dated February 6th, 2024.
Hilcorp has elected not to appeal docket number OTH-24-004 and is submiƫng payment of the civil
penalty for violaƟng the June 10, 2022 condiƟonal approval leƩer for the EndicoƩ Field Main ProducƟon
Island (EndicoƩ) oil custody transfer meters. Enclosed find payment to AOGCC for docket number OTH-
24-004 in the amount of $55,000.
PrevenƟon Measures to Prevent Recurrence of ViolaƟon
We are taking this violaƟon seriously and are acƟvely working to ensure it does not recur. The below
acƟons and measures that EndicoƩ has implemented to prevent recurrence of a metering violaƟon are
listed below:
1. Added all CondiƟons Of Approval (COA’s) for oil custody transfer meters to Compliance Task
Manager system to trigger noƟficaƟons to submit 24 hour noƟce and subsequent reports bi-
weekly.
2. Management of Change (MOC) Pre-Start up Safety Review (PSSR) will be held on all MOC’s going
forward to ensure all parƟes are aware of COA’s.
3. A paper copy of the COA’s will be aƩached to new equipment before start up to flag COA’s.
If you have an addiƟonal quesƟons, please contact me.
By Samantha Coldiron at 8:43 am, Feb 20, 2024
Docket Number OTH-24-004
February 8, 2024
Page 2 of 2
Sincerely,
HILCORP ALASKA, LLC
Sara Hannegan
OperaƟons Manager – Alaska Islands Team
Cc: Anthony McConkey, Asset Team Lead, Alaska Islands
Denali Kemppel, General Counsel
Digitally signed by Sara
Hannegan (2519)
DN: cn=Sara Hannegan (2519)
Date: 2024.02.19 09:25:05 -
09'00'
Sara Hannegan
(2519)
1
333 West Seventh Avenue
Anchorage, Alaska 99501-3572
Main: 907.279.1433
Fax: 907.276.7542
www.aogcc.alaska.gov
February 6, 2024
CERTIFIED MAIL –
RETURN RECEIPT REQUESTED
7018 0680 0002 2052 9822
Sara Hannegan
Operations Manager, Endicott
Hilcorp Alaska, LLC
3800 Centerpoint Drive, Suite 1400
Anchorage, AK 99503
Re: Docket Number: OTH-24-004
Notice of Proposed Enforcement Action
Missing Meter Performance Reports
Duck Island Unit
Dear Ms. Hannagan:
Pursuant to 20 AAC 25.535, the Alaska Oil and Gas Conservation Commission (AOGCC) hereby
notifies Hilcorp Alaska, LLC (Hilcorp) of a proposed enforcement action.
Nature of the Apparent Violation or Noncompliance (20 AAC 25.535(b)(1)).
Hilcorp has violated the provisions of the conditional approval letter for the Duck Island Unit
custody transfer oil measurement equipment.
Basis for Finding the Violation or Noncompliance (20 AAC 25.535(b)(2)).
Custody transfer measurement equipment for Duck Island Unit oil was conditionally approved by
the AOGCC on June 10, 2022. Requirements imposed include the meter prove frequency,
notification to the AOGCC for opportunity to witness meter proves, required actions before
making changes to the custody transfer measurement equipment, reporting obligations following
meter proves, and a trial period demonstration where the new Coriolis meter performance would
be compared to the existing turbine meters. The successful demonstration period was initiated in
September 2023 and completed on October 6, 2023. Two approval conditions have been repeatedly
violated since the trial demonstration period was concluded:
- Condition 5 of the approval letter requires Hilcorp provide at least 24-hour advance notice
to the AOGCC for the opportunity to witness the monthly meter prove. Hilcorp has failed
to notify the AOGCC of monthly meter proves in December 2023 and January 2024.
Docket Number: OTH-24-004
February 6, 2024
Page 2 of 3
- Condition 6 of the approval letter requires submittal of the monthly meter prove results be
submitted within 7 days, including prove reports, batch summaries, and the current meter
curve or meter factor control charts with the specified control limits used to determine
when to initiate maintenance or corrective actions. Hilcorp has failed to submit meter
performance reports for November 2023 through January 2024.
Proposed Action (20 AAC 25.535(b)(3)).
For violating provisions of the June 10, 2022, conditional approval letter for Duck Island Unit oil
custody transfer measurement equipment, the AOGCC intends to impose civil penalties on Hilcorp
under AS 31.05.150(a) in the amount of $55,000:1
- $10,000 - failure to notify for opportunity to witness meter proves (2 months; $5,000
each);
- $45,000 - failure to submit meter performance reports (3 months; $15,000 each).
In determining the amount of the penalty, the AOGCC has considered the criteria in AS
31.05.150(g), with emphasis on the need to deter similar behavior by Hilcorp and others similarly
situated at the time of the violation or in the future, and Hilcorp’s four previous instances of
noncompliance similar to the Duck Island Unit oil meter violation.2
In addition to the imposed civil penalty, the AOGCC intends to require Hilcorp to provide the
following within 10 days of the final decision date:
- a detailed written explanation that describes how it intends to prevent recurrence of this
violation; and
- the missing meter performance information.
As an operator involved in an enforcement action you are required to preserve documents
concerning the above actions until after resolution of the proceeding.
Rights and Liabilities (20 AAC 25.535(b)(4)).
Within 15 days after receipt of this notification – unless the AOGCC, in its discretion, grants an
extension for good cause shown – Hilcorp may file with the AOGCC a written response that
concurs in whole or in part with the proposed action described herein, requests informal review,
or requests a hearing under 20 AAC 25.540. If a timely response is not filed, the proposed action
will be deemed accepted by default. If informal review is requested, the AOGCC will provide
Hilcorp an opportunity to submit documentary material and make a written or oral statement. If
Hilcorp disagrees with the AOGCC’s proposed decision or order after that review, it may file a
written request for a hearing within 10 days after the proposed decision or order is issued. If such
a request is not filed within that 10-day period, the proposed decision or order will become final
on the 11th day after it was issued. If such a request is timely filed, the AOGCC will hold its
decision in abeyance and schedule a hearing.
1 AS 31.05.150(a) provides for not more than $100,000 for the initial violation and not more than $10,000 for each
day thereafter on which the violation continues.
2 Refer to Other Orders 113, 153, and 170.
Docket Number: OTH-24-004
February 6, 2024
Page 3 of 3
If Hilcorp does not concur in the proposed action described herein, and the AOGCC finds that
Hilcorp violated a provision of AS 31.05, 20 AAC 25, or an AOGCC order, permit or other
approval, then the AOGCC may take any action authorized by the applicable law including
ordering one or more of the following: (i) corrective action; (ii) suspension or revocation of a
permit or other approval; and (iii) imposition of penalties under AS 31.05.150. In taking action
after an informal review or hearing, the AOGCC is not limited to ordering the proposed action
described herein, as long as Hilcorp received reasonable notice and opportunity to be heard with
respect to the AOGCC’s action. Any action described herein or taken after an informal review or
hearing does not limit the action the AOGCC may take under AS 31.05.160.
Sincerely,
Brett W. Huber, Sr.
Chair, Commissioner
cc: Phoebe Brooks
Brett W.
Huber, Sr.
Digitally signed by Brett W.
Huber, Sr.
Date: 2024.02.06 15:25:35
-09'00'