Alaska Logo
Department of Commerce, Community, and Economic Development
Alaska Oil and Gas Conservation
Commission
Loading...
HomeMy WebLinkAbout198-007Pages NOT Scanned in this Well History File XHVZE This page identifies those items that were not scanned during the initial scanning Project. They are available in the original file and viewable by direct inspection. / ~ - ~g) ~' File Number of Well History File PAGES TO DELETE Complete RESCAN Color items- Pages: _~ Grayscale, halftones, pictures, graphs, charts- Pages: Poor Quality Original- Pages: [] Other - Pages: DIGITAL DATA [] Diskettes, No. [] Other, No/Type OVERSIZED [] Logs of various kinds [] Other COMMENTS: Scanned b~~red Daretha Nathan Lowell TO RE-SCAN Notes: Re-Scanned by: Bevedy Mildred Daretha Nathan Lowell Date: Is~ STATE OF ALASKA ~~ ~~~`~1~~~ ALAS~IL AND GAS CONSERVATION CON~SION DES 0 ~ ~~y WELL COMPLET{ON OR RECOMPLET{ON REPORT AND LOG Alaska Oil & Gas Ctrf~, ~ammission 1 a. Well Status: ^ Oil ^ Gas ^ Plugged ®Abandoned ^ Suspended 2oAAC zs.~os 20AAC 25.110 ^ GINJ ^ WINJ ^ WDSPL ^ WAG ^ Other No. of Completions Zero 1 b. Well ®Development ^ Exploratory ^ Service ^ Stratigraphic 2. Operator Name: BP Exploration (Alaska) Inc. 5. Date Comp., Susp., or Aband. 10/27/2007 12. Permit to Drill Number 198-007 - 307-285 3. Address: P.O. Box 196612, Anchorage, Alaska 99519-6612 6. Date Spudded 04/13/1998 13. API Number 50-029-20551-01-00 4a. Location of Well (Governmental Section): Surface: ' ' 7. Date T.D. Reached 05/14/1999 14. Well Name and Number: PBU 14-18A 1659 FNL, 1784 FEL, SEC. 09, T10N, R14E, UM Top of Productive Horizon: 1357' FNL, 3751' FEL, SEC. 09, T10N, R14E, UM 8. KB (ft above MSL): 71' ' Ground (ft MSL): 15. Field /Pool(s): Prudhoe Bay Field / Prudhoe Bay Total Depth: 1885' FNL, 5134' FEL, SEC. 09, T10N, R14E, UM 9. Plug Back Depth (MD+TVD) 10773 8740 Pool 4b. Location of Well (State Base Plane Coordinates, NAD 27): Surface: x- 674699 y- 5938669 Zone- ASP4 10. Total Depth (MD+TVD) 10815 - 8740 16. Property Designation: ADL 028312 _ TPI: x- 672724 y_ 5938926 Zone- ASP4 Total Depth: x- 671356 y- 5938366 Zone- ASP4 11. SSSV Depth (MD+TVD) N/A 17. Land Use Permit: 18. Directional Survey ^ Yes ®No Submit electronic and tinted information er 20 AAC 25.050 19. Water depth, if offshore N/A ft MSL 20. Thickness of Permafrost (TVD): 1900' (Approx.) 21. Logs Obtained (List all logs here and submit electronic and printed information per 20 AAC 25.071): GR / CCL, MWD / GR 22. CASING, LINER AND CEMENTING RECORD CASING SETTING DEPTH MD SETTING DEPTH ND HOLE AMOUNT WT. PER FT. GRADE TOP BOTTOM '- TOP.:'- ;BOTTQM SIZE CEMENTING RECORD PULLED 20" 94# H-40 Surf ce 80' Surfa 80' 32" 300 sx Permafro t 13-3/8" 72# L-80 S rface 2651' Surface 2651' 17-1/2" 2615 sx Fondu 400 sxAS II 9-5/8" 47# L-80 S rface 9266' Surface 8707' 12-1/4" 500 sx Class 'G' 7" 29# L-80 8913' 9285' 8417' 8721' 8-1/2" 450 sx Class 'G' 3-1/2" x 3-3/16" 8.8#! 6.2# L-80 8898' 9988' 8405' 8766' 4-1/8" 140 sx LARC 2-3/8" 4.6# L-80 9886' 10804' 8766' 8740' 2-3/4" Uncemented Slotted Liner 23. Open to production or inject ion? ^ Yes ®No 24. TUBING RECORD If Yes, list each i (MD+TVD of Top & Bottom; Pe nterval open rforation Size and Number): SIZE DEPTH SET MD PACKER SET MD 4-112", 12.6#, L-80 6000' - 8960' 8836' MD TVD MD TVD _ p q 25. ACID, FRACTURE, CEMENT SQUEEZE, ETC. p y ~ ~C , `- ~~ ~ ~ ~00~ DEPTH INTERVAL MD AMOUNT & KIND OF MATERIAL USED 9886' Set CIBP 8836' P&A w/ 11 Bbls of Cement 3528' Set CIBP 3506' Set Whipstock 26. ~ a . .._... _ . _.:.___ _ .. PRODUCTION TEST Date First Production: Not on Production Method of Operation (Flowing, Gas Lift, etc.}: N/A Date Of Test: HOUrS Tested: PRODUCTION FOR TEST PERIOD OIL-BBL: GAS-MCF: WATER-BBL: CHOKE SIZE: GAS-OIL RATIO: Flow Tubing Press. CaSing PfeSS: CALCULATED 24-HOUR RATE OIL-BBL: GAS-MCF: WATER-BBL: OIL GRAVITY-API (CORK): 27. CORE DATA Conventional Core(s) Acquired? ^ Yes ®No Sidewal l Cores Ac uired? ^ Yes ®No If Yes to either question, list formations and intervals cored (MD+TVD of top and bottom of each), and summarize lithology and presence of oil, gas or water (submit separate sheets with this form, if needed). Submit detailed descriptions, core chips, photographs and laboratory analytical results per 0. 250 1. None `~~ Form 10-407 Revised 02/2007 CONTINUED ON REVERSE SIDE ~ ~ ~ iJ~ i^` ~ ~ L~OI 28. GEOLOGIC MARKERS (LIST ALL FORMATIONS A KERS ENCOUNTERED): 29. FORMATION TESTS NAME TVD Well Teste ^ Yes ®No Permafrost Top If yes, list intervals and formations tested, briefly summarizing test results. Attach separate sheets to this form, if needed, and submit Permafrost Base detailed test information per 20 AAC 25.071. Sag River 9279' 8717' None Shublik 9310' 8739' Formation at Total Depth (Name): 30. List of Attachments: Summary of Pre-Rig Work and Daily Drilling Reports, Well Schematic Diagram 31. I hereby certify that the fore oing is true and correct to the best of my knowledge. ~~/ Si d (~- ` gne Terrie Hubble Title Drilling Technologist Date ~ PBU 14-18A 198-007 307-285 Prepared By Name/Number. Terrie Hubble, 564-4628 Well Number Permit No. / A rOVal NO. Drilling Engineer: Jim Nigh, 564-5220 INSTRUCTIONS GeNew-~: This form is designed for submitting a complete and correct well completion report and log on all types of lands and leases in Alaska. Submit a well schematic diagram with each 10-407 well completion report and 10-404 well sundry report when the downhole well design is changed. IreM 1a: Classification of Service Wells: Gas Injection, Water Injection, Water-Alternating-Gas Injection, Salt Water Disposal, Water Supply for Injection, Observation, or Other. Multiple completion is defined as a well producing from more than one pool with production from each pool completely segregated. Each segregated pool is a completion. IreM 4b: TPI (Top of Producing Interval). IreM 8: The Kelfy Bushing and Ground Level elevation in feet above mean sea level. Use same as reference for depth measurements given in other spaces on this form and in any attachments. IreM 13: The API number reported to AOGCC must be 14 digits (ex: 50-029-20123-00-00). IreM 20: Report true vertical thickness of permafrost in Box 20. Provide MD and TVD for the top and base of permafrost in Box 28. IreM 22: Attached supplemental records for this well should show the details of any multiple stage cementing and the location of the cementing tool. IreM 23: If this well is completed for separate production from more than one interval (multiple completion), so state in item 1, and in item 23 show the producing intervals for only the interval reported in item 26. (Submit a separate form for each additional interval to be separately produced, showing the data pertinent to such interval). IreM 26: Method of Operation: Flowing, Gas Lift, Rod Pump, Hydraulic Pump, Submersible, Water Injection, Gas Injection, Shut-In, or Other (explain). IreM 27: Provide a listing of intervals cored and the corresponding formations, and a brief description in this box. Submit detailed description and analytical laboratory information required by 20 AAC 25.071. IreM 29: Provide a listing of intervals tested and the corresponding formation, and a brief summary in this box. Submit detailed test and analytical laboratory information required by 20 AAC 25.071. Form 10-407 Revised 0212007 Submit Original Only • Well History • Well Date Summary 14-18A 8/16/2007 T/I/0= 1790/1710/0+. Temp= SI. Tubing & IA FL (SL). A/L spool removed. Integral installed on IA. Tubing FL @ 5487' between sta# 1 & 2. IA FL @ 7305' between sta# 2 & 3. 14-18A 8/30/2007 T/IA/OA= SSV/1600/0 Temp=Sl PPPOT-T (PASS) PPPOT-IC (PASS) (PRE RST) PPPOT-T RU HP bleed tool onto THA test void, 50 psi to 0 psi. Cycle LDS "Standard" (1) blank in place of LDS all moved easily with no damage on flats. Pressure to 5000 psi for 30 min, 5000/ 15 mins, 4950/ 30 mins. Bleed void to 0 psi RD test equipment, re-installed Alemite cap. PPPOT-IC RU HP bleed tool onto IC test void, 50 psi to 0 psi. Cycle LDS "Standard" all moved easily with no damage on flats. Pressured to 3500 psi for 30 min, 3400/ 15 mins, 3400/ 30 mins. Bleed void to 0 psi, RD test equipment, re-installed Alemite cap. 14-18A 9/3/2007 T/I/0= 1800/1600/0 Temp= S/I Assist Slick line with brush n flush (pre-rig screening) Pumped 36 bbls. 50* diesel down tbg in attempt to displace the plastic coating, the tbg pressured up to 3000 psi., Bleed TBG pressure, Released form jobsite. Final WHP's 1850/1600/20. Annulus casing valves tagged & left open. 14-18A 9/3/2007 ****WELL S/I ON ARRIVAL*** (pre mit's / sdtrk screening) LRS PUMPS 35BBLS AWAY, TUBE PRESSURES UP. DRIFT W/ 3.80 GAUGE RING. SD @ 8840' SLM. ATTEMPT TO SET 4.5 PX BODY COULD NOT SET DUE TO PLASTIC. POOH BOTH PINS SHEARED AND PLUG STUCK ON X-LINE BY P.C. TUBING. RE-RUN PLUG BODY, UNABLE TO SET. POOH W/ PLUG BODY (AGAIN PACKED w/PLASTIC). ABORT JOB. FLUID LEVEL - 4260' SLM. WELL S/I ON DEPART, DSO NOTIFIED. 14-18A 9/25/2007 T/I/0=1750/1725/20 Load IA (Rig ST Prep) -Loaded IA w/a total of 10 bbl neat methanol, 433 bbls 80*F crude. Pumped IA w/205 bbls, TP increased from 1750 psi to 3000 psi. Bled TP from 3000 psi to 1950 psi in 3 hrs, all gas. IAP decreased from 2400 psi to 1350 psi while bleeding tbg. Pumped down IA w/additional 90 bbls crude maintaining open bleed on tbg. TP increased from 1950 psi to 3000 psi. Bled TP from 3000 psi to 1900 psi in 2 hrs 20 mins, all gas. IAP decreased from 2500 psi to 1100 psi while bleeding tbg. Bled tbg from 3000 to 1600 psi in 2hrs and 40 min, pumped an additional 68 bbls down IA. FWHP's=1250/600/0. Tbg/Perfs appear to be plugged. Tagged wing and IA valves, Annulus valves left open to gauges. Note: Flow line Blinded @ IGV. 14-18A 9/29/2007 CTU #5 Job Scope: Set CIBP/Cement P&A* MIRU 1.75" CT Perform BOPE test to meet conditions of Sundry approval. Commission representative waived witnessing test. RIH w. 2.5" JSN and drift & tag top of 2 3/8" liner @ 9883. Continue job on 9/30/2007. 14-18A 9/30/2007 CTU #5 continue from 09-29-07 RIH w. 2 1/2" CIBP sat down on 3 3/16" liner top @ 8834' attempted to work by no luck. Straightened CT and added wt bars between MHA and setting tool in an attempt to straighten out the BHA. 2nd attempt no luck. Once OOH went to dress shoulders on CIBP and slips fell out broken on to back deck of CTU. 3rd run was made with Baker CIBP with machined cone continued to SD @ 8834' Called APE and discussed situation. RIH w. slick assembly and 1.75" JSN. Continue job on 10/1/2007. 14-18A 1011/2007 CTU #5 Continue WRS from 9130/07 RIH w. 1.75" CIBP set @ 9915' CTM set down 3k twice. Attempted to varafiy integrety of CIBP would not pressure test. Called town APE. RIH w. 2.5" CIBP set @ 9886 CTM Pressure test CIBP to 1000 WHP w. hole full of 1 % KCL. RIH w. 1.75" BDN Tag CIBP & correct depth to CIBP (9885') PUH and flag pipe w. white & blue flag. Lay in 11 bbls of 15.8 ppg Cement from 9885 to 8694' Wash down 2:1 with Biozan to 8830' POOH @ 80% washing across GLM's Freeze protect well from 2500' w. 50/50 methanol. Continue Job on 10/1/2007. • Well History • Well Date Summary 14-18A 10/2/2007 WELL SHUT IN ON ARRIVAL [tag toc / mit t x ia] RAN 3.75" DRIFT & SAMPLE BAILER. TAGGED TOP OF CEMENT @ 8814' SLM (8838' CORR MD - CORRECTED OFF OF SVLN), CLEAR DRIFT- S. BAILER EMPTY. PERFORMED CMIT-T x IA TO 3,500 PSI. PASSED AS PER PE, BLED TUBING TO ZERO PSI...SEE DATA TAB FOR DETAILS. RAN 3.84" DRIFT TO SVLN. TAGGED SVLN @ 2239' SLM, 2263' MD. 24' CORRECTION TO 2263' MD. LEFT WELL SHUT-IN, TURNED WELL OVER TO DSO. 14-18A 10/4/2007 INITIAL WHP 0/0/0 CUT TUBING MID JOINT WITH 3.65" SUPER JET POWER CUTTER 6002'. CORRELATED TO GLM AT 5607'. WELL SHUT IN. FINAL WHP 0/0/0. JOB COMPLETE. 14-18A 10/7/2007 Job Continued From 10-6-07 WSR T/I/0=300/150/0 Circ-Out (Rig Side Track Prep) - Circ down tbg up IA w/8 bbl neat methanol spear, 927 bbls 110*F 1 % kcl taking returns to 14-11 flowline. Pumped down IA w/160 bbls 100*F diesel taking returns from tbg to 14-11 flowline. U-tube TxIA to freeze protect. CMIT TxIA PASSED to 3500 psi -Pressured up TxIA via IA w/8.2 bbls diesel. T/IA lost 60/60 psi in 1st 15 min. T/IA lost 20/20 psi in 2nd 15 min. Bleed TxIAP via IA from 3420/3420 psi to 0/0 psi, all fluid --9 bbls. MIT OA PASSED to 2000 psi on 5th attempt. Pressured up OA wl6 bbls diesel. OA lost 200 psi in 1st 15 min. Bump up OAP w/0.2 bbls diesel. OA lost 100 psi in 1st 15 min. OA lost 70 psi in 2nd 15 min. Bump up OAP w/0.2 bbls diesel. OA lost 60 psi in 1st 15 min. OA lost 40 psi in 2nd 15 min. Bump up OAP w/0.1 bbls diesel. OA lost 50 psi in 1st 15 min. OA lost 30 psi in 2nd 15 min. Bump up OAP w/0.1 bbls diesel. OA lost 40 psi in 1st 15 min. OA lost 20 psi in 2nd 15 min. Passed, Bleed OAP, all fluid -2 bbls. Verify casing valves open to gauges, tag well & notify operator. Final WHP's=0/0/0 14-18A 10/8/2007 Set 5 1/8" x 7 1/16" gray type K BPV, for flowline removal and pre rig (2ES). Set at 108" deep. 14-18A 10/21/2007 T/I/0=??/0/0. Temp = SI. Monitor (pre CTD). Integral installed on IA. Well head has safe out lock on master valve, Well house, scaffolding &flowline have been removed for rig. **Note** Rig scaffolding needs to be setup for Coil. • BP EXPLORATION Page 1 of 13 Operations Summary -Report Legal Well Name: 14-18 Common Well Name: 14-18 Spud Date: 4/8/1981 Event Name: REENTER+COMPLETE Start: 10/23/2007 End: Contractor Name: NABORS ALASKA DRILLING I Rig Release: Rig Name: NABORS 2ES Rig Number: Date From - To Hours Task Code NPT Phase Description of Operations 10/23/2007 04:00 - 11:00 7.00 MOB P PRE Prep shop for move. Unplug and rig down buildings. Move cuttings tank and welding shop. Disconnect jack and pull pits away. PJSM. Jack up sub. Pull malts and move sub off well. Line up sub on well 14-18. Lay herculite and spot sub over well. PJSM. Spot pits and hook up interconnect. Berm sub and pits. Install cuttings tank, mud lab, camp, shop and MWD shack. 11:00 - 13:30 2.50 RIGU P PRE Install pump-in flange on OA. Rig up circulating lines from #2 kill to OA. Take on seawater in pits. Rig up secondary annulus valve on IA. Rig up to test 9-5/8" x 13-3/8" annulus. IA and OA at 0 psi. Rig accept at 1100 hours. 13:30 - 14:30 1.00 WHSUR P DECOMP PJSM. Test 9-5/8" x 13-3/8" annulus to 2000 psi for 30 minutes. Test OK. 14:30 - 15:30 1.00 WHSUR P DECOMP PJSM. Rig up DSM lubricator. Test to 500 psi. Test OK. Pull BPV and rig down DSM. 15:30 - 17:00 1.50 WHSUR P DECOMP PJSM. Rig up to circulate out diesel. Test mud lines to 3000 psi. 17:00 - 19:30 2.50 WHSUR P DECOMP PJSM. Circulate diesel out of tubing at 145 gpm with 310 psi. Swap hoses and circulate down tubing at 155 gpm with 240 psi. Blow down lines and rig down. 19:30 - 22:30 3.00 WHSUR P DECOMP PJSM. Rig up DSM lubricator and test to 500 psi. Test OK. Set BPV and install dart to convert to TWC. Test from below to 1000 psi. Test OK. Attempt to test from above. Flange leaking on tree. Tighten up flange. Still leaking. Rig down. 22:30 - 00:00 1.50 WHSUR P DECOMP PJSM. Nipple down tree and adaptor flange. 10/24/2007 00:00 - 01:00 1.00 WHSUR P DECOMP PJSM. Function lock down screws on tubing spool. Check hanger neck threads, 18-1/2 turns by hand. Strap RKB's. 01:00 - 04:00 3.00 BOPSU P DECOMP PJSM. Nipple up BOP stack. Install mouse hole. 04:00 - 06:00 2.00 BOPSU N RREP DECOMP Remove top drive torque tube guide rail. Bolts worn. No new bolts for new rails. Reinstall old rail and bolts. Torque and safety wire bolts. 06:00 - 16:00 10.00 BOPSU P DECOMP PJSM. Make up 4-1/2" test joint. Fill stack and test BOPE. Unable to get low pressure tests. Trouble shoot and isolate valves. Pull test joint and test BPV/Dart against blind rams. Drain stack and change out dart. Resume testing. Test BOPE to 250 psi low, 3500 psi high and annular to 250 psi low, 2500 psi high as per AOGCC. Test witness waived by Chuck Scheve with AOGCC. Test witnessed by WSL Dick Maskell and Toolpusher Charlie Henley. Rig down test equipment and blow down. 16:00 - 19:00 3.00 DHB P DECOMP PJSM. Rig up DSM lubricator and extension. Close top rams on lubricator extension. Test to 500 psi. Bleed to 0 psi. Pull dart and BPV. R/D lubricator. 19:00 - 19:30 0.50 PULL P DECOMP PJSM. Clear derrick of frost and ice. Inspect derrick. 19:30 - 21:00 1.50 FISH P DECOMP PJSM. Make up spear assembly. Spear tubing. Back out lock down screws, (BOLDS). Pull tubing free with 180k. Pull to floor with string weight of 90k. Lay down spear assembly and hanger. 21:00 - 22:00 1.00 PULL P DECOMP PJSM. Rig up casing tools and control line spooler. 22:00 - 00:00 2.00 PULL P DECOMP PJSM. Pu114-1/2" tubing, laying down to 4825'. Recovered 1 SS bands and 13 clamps. 10/25/2007 00:00 - 05:00 5.00 PULL P DECOMP PJSM. Pull 4-1/2" tubing and control line to SVLN. Rig down Printed: 11/12/2007 4:39:47 PM • • BP EXPLORATION Operations Summary Report - Page 2 of 13 I Legal Well Name: 14-18 Common Well Name: 14-18 Spud Date: 4/8/1981 Event Name: REENTER+COMPLETE Start: 10/23/2007 End: Contractor Name: NABORS ALASKA DRILLING I Rig Release: Rig Name: NABORS 2ES Rig Number: Date I From - To I Hours I Task I Code I NPT I Phase 10/25/2007 100:00 - 05:00 I 5.001 PULL I P 05:00 - 06:00 1.00 I PULL ~ P 06:00 - 10:30 4.50 BOPSU P 10:30 - 11:30 I 1.OO) BOPSU~P 11:30 - 13:30 2.00 BOPSU P 13:30 - 14:00 0.50 CLEAN P 14:00 - 14:30 0.50 CLEAN P 14:30 - 15:00 0.50 CLEAN N 15:00 - 16:30 1.50 CLEAN P 16:30 - 20:30 4.00 CLEAN P 20:30 - 21:30 I 1.001 CLEAN I P 21:30 - 22:30 1.00 CLEAN P 22:30 - 23:30 1.00 CLEAN P 23:30 - 00:00 0.50 EVAL P 10/26/2007 00:00 - 01:30 1.50 EVAL P 01:30 - 06:30 5.00 EVAL P 06:30 - 09:00 2.50 DHB P 09:00 - 10:00 1.00 DHB P 10:00 - 12:30 2.50 DHB N 12:30 - 14:30 I 2.001 DHB I P 14:30 - 15:30 1.00 DHB P 15:30 - 17:00 1.50 BOPSU P 17:00 - 19:00 I 2.001 WHSUR I P 19:00 - 22:00 I 3.001 WHSUR I P 22:00 - 23:00 1.OO) BOPSU~ P 23:00 - 00:00 1.00 BOPSU P 110/27/2007 100:00 - 01:00 I 1.001 WHSUR I P 01:00 - 02:00 I 1.001 STWHIPI P Description of Operations DECOMP spooling unit. Continue to pull 4-1 /2" tubing. Recovered 148 full joints, 1 cut joint at 18.50', 2 GLM, 1 SVLN, 2 SS bands and 28 control line clamps. DECOMP Clear and clean floor. Prepare for testing BOPE. DECOMP PJSM. Make up 5" test joint. Install test plug and test rams, lower mud cross and top drive valves. Test to 250 psi low, 3500 psi high and Hydril to 250 psi low, 2500 psi high as per AOGCC. Test witness waived by Chuck Scheve with AOGCC. Test witnessed by WSL Dick Maskell and Toolpusher Charlie Henley. Unable to get a good test on the manual IBOP. DECOMP PJSM. Change out manual top drive TIW valve and adjust grabber. DECOMP Make up floor valve to test joint. Continue to test ROPE as per AOGCC. Rig down and blow down lines. Install wear ring. DECOMP Clear and clean floor. DECOMP PJSM. Pick BHA up beaver slide. RREP DECOMP Columbia installing skate indicator lights. DECOMP PJSM. Make up 9-5/8" scraper BHA to 559'. DECOMP PJSM. Pick up 5" DP and RIH to 4250'. Pull one stand and rack back. DECOMP Circulate hi-vis sweep surface to surface at 575 gpm with 750 psi. Pump dry job. Install rubbers. Mud weight in and out 8.5 ppg. Up and down weight 110k. DECOMP PJSM. POOH to 559'. DECOMP PJSM. Stand back HWDP. Lay down bit, scraper, bit sub and float sub. Clear floor. DECOMP PJSM. Pick E-line logging tools up beaver slide. DECOMP PJSM. Rig up E-line unit. DECOMP Run GR/CCL/USIT log up from 4000' in corrosion and cement modes. DECOMP Re-head line for bridge plug. (Town reviewing USIT data). DECOMP RIH with CIBP on E line. Attempt to set - no success. DFAL DECOMP POH with tools. Found bad connection in GR tool. Change GR and firing head. Re-run CIBP. DECOMP Log on depth and set CIBP with top at 3519' ELMD (5' above casing coupling). POH and RD SWS. DECOMP PJSM. Test CIBP and 9-5/8" casing to 3500 psi for 30 minutes. Test OK. DECOMP PJSM. Lay down mouse hole. Pull wear ring. Nipple down BOP stack. DECOMP PJSM. Nipple down tubing spool and remove from cellar. Bring in new tubing spool. Make up running tool and pull 9-5/8" packoff. DECOMP Install new packoff and tubing spool. Set BOP stack down on spool. Torque flange and test void to 5000 psi for 30 minutes. Test OK. DECOMP PJSM. NU BOP stack. Install riser and mouse hole. DECOMP PJSM. Install test plug and test flanges to 250 psi low, 3500 psi high as per AOGCC. Pull test plug. DECOMP PJSM. Blow down kill line. Attempt to install wear ring. Unable to jay into ring. Running tool hanging up on inside of wear ring. Grind out inside of wear ring running profile. WEXIT PJSM. Bring 9-5/8" whipstock assembly up beaver slide while Printed: 11/12/2007 4:39:47 PM • • BP .EXPLORATION Page:3 of 13 .Operations Summary: Report Legal Well Name: 14-18 Common Well Name: 14-18 Spud Date: 4/8/1981 Event Name: REENTER+COMPLETE Start: 10/23/2007 End: Contractor Name: NABORS ALASKA DRILLING I Rig Release: Rig Name: NABORS 2ES Rig Number: Date From - To Hours Task Code NPT Phase Description of Operations 10/27/2007 01:00 - 02:00 1.00 STWHIP P WEXIT getting new wear ring delivered. 02:00 - 02:30 0.50 STWHIP P WEXIT Install new wear ring. RILDS. Break out running tool and lay down. 02:30 - 07:30 5.00 STWHIP P WEXIT PJSM. Pick up and make up 9-5/8" whipstock BHA. Scribe whipstock slide face. Adjust UBHO sub fior allignment with slide. PU/MU HWDP, bumper sub, drill collars, HWDP and RIH to 913'. 07:30 - 10:00 2.50 STWHIP P WEXIT PJSM. Install rubber and air slips. RIH to 3467'. Fill pipe at 200 gpm with 140 psi. Remove air slips. Install blower hose. Up weight 125k, down 130k. Break out top drive. Blow down. 10:00 - 11:30 1.50 STWHIP P WEXIT PJSM. Pick Gyro tools up beaver slide. Hang sheaves. MU tools. 11:30 - 14:00 2.50 STWHIP P WEXIT RIH with Gyro to UBHO sub. Work pipe and orient to 224 degrees. Shoot survey. POOH with Gyro. Re-run for confirmation shot. POOH. Lay down Gyro tools. Bring Geo-Pilot skid up to rig floor and spot. 14:00 - 14:30 0.50 STWHIP P WEXIT Make up last DP stand. RIH and tag EZSV at 3528'. Stand back one stand and PU single. RIH and set whipstock anchor with 20k down. Pick up and confirm set. Shear slide lug with 45k down. Pick up. 14:30 - 15:00 0.50 STWHIP P WEXIT Pump 40 bbl spacer and displace well to 9.5 ppg milling fluid. Pump at 600 gpm with 1000 psi. 15:00 - 00:00 9.00 STWHIP P WEXIT Begin milling operations. Top of window at 0 o om o window at 3522'. Mill ahead to 3531' MD. Pump at 440 gpm with 620 psi. Rotate at 70 to 100 rpm with 1 to 4k torque. WOB 2-5k. Up weight 125k, down 130k. 10/28/2007 00:00 - 01:30 1.50 STWHIP P WEXIT Mill ahead to 3555' MD. Pump at 440 gpm with 610 psi. Rotate at 70 to 100 rpm with 1-2k torque off bottom, 2-3k torque on bottom. WOB 2-5k. Up weight 125k, down 130k. Work through window several times. Pull up shut down and run through window with no problems. Circulate hole clean. Mud weight in and out 9.5 ppg. 01:30 - 02:00 0.50 STWHIP P WEXIT PJSM. Perform FIT to 11.77 ppg EMW with 420 psi at surface. Bleed off, open rams and blow down lines. Lay down single. Monitor well for 10 minutes -static. 02:00 - 02:30 0.50 STWHIP P WEXIT Pump dryjob at 250 gpm with 325 psi. Bleed off and blow down. Remove blower hose. Install rubbers and air slips. 02:30 - 04:00 1.50 STWHIP P WEXIT PJSM. POOH to 913'. Remove air slips. 04:00 - 05:00 1.00 STWHIP P WEXIT PJSM. Rack back HWDP. Lay down 9-5/8" whipstock assembly. Upper mill in gauge. 05:00 - 06:00 1.00 STWHIP P WEXIT Rig up BOP stack flushing tool. Flush stack, flow line and possum belly. Clear and clean Floor. Prepare to PU 8-1 /2" drilling assembly. Recovered a total of 250 Ibs of metal from hole. 06:00 - 10:00 4.00 STWHIP P WEXIT PJSM. Pick up remaining 8-1/2" BHA. PU motor, MU bit and BHA to UBHO sub. Scribe and orient sub. Verify gyro will seat with head. 10:00 - 11:30 1.50 STWHIP P WEXIT Plug in and upload MWD. Make up to top drive. Surface test MWD at 450 gpm with 740 psi. Test OK. 11:30 - 15:30 4.00 STWHIP P WEXIT PJSM. RIH picking up 5" DP to 3474'. 15:30 - 17:30 2.00 DRILL P INT1 PJSM. Cut and slip 96' of drilling line. Inspect brakes and traction motor brushes. Lube Elmago Splines. Investigate and Printed: 11/12/2007 4:39:47 PM 14-18 B DRLG DRAFT J -2,250' ~-- ~ roc room aownsgeeze ~ 2,203' 4-1/2" HES X Nipple 2,651' 13-318" CSG, 721, N-60,ID~t2.34T 3,506' KOP 3506 9-5/8" Top of Window 3,528' 9-5/8" EZSV 4-1/2" 13CR-80 VAM To TBG T Csg, 26#„ L-80, BTC-M TOC 9-5/8" 7,934' ;~ 8~ • TREE = GRAY GEN 2 V4ELLHEAD= ACTUATOR = GRAY AXELSON KB. ELEV = BF. ELEV = 70_.46' - 41.96' KOP = 3500' Max Angle = 51 ~ 5615' Datum MD = 10981' Datum ND = 8800' SS GAS LIFT MANDRELS ST MD ND DEV TYPE VLV LATCH PORT DATE 7 2849 2849 0 KBG2 DCR BEK 0 11/12/07 6 4009 3994 19 KBG2 DMY BK 0 11/12/07 5 5252 4995 48 KBG2 DMY BK 0 11 /12/07 4 6781 6014 47 KBG2 DMY BK 0 11 /12/07 3 8273 7011 48 KBG2 DMY BK 0 11/12/07 2 9430 7809 46 KBG2 DMY BK 0 11/12/07 1 10335 8428 46 KBG2 DMY BK 0 11/12/07 10 414' -HES 4-1/2" X Nipple, ID=3.813" 10 445' 7" x 4-1/2" BKR S-3 PKR 10 478' HES 4-1/2" X Ni le, ID=3.813• 10 551' HES 4-1 /2" XN Nipple, 10=3.725• ~~ _ 10 555' -Han er/Liner To Packer of4-1/2"TBGCu~ ~- q_1/2"WLEG f6' TOC 9,266' 9-5/8", 47#, L-80, ID=8.861" 9,886` ~---~ CIBP ~~ DATE REV BY COMMENTS DATE REV BY COMMENTS 1981 ORIGINAL COMPLETION 04113/98 RIG SIDETRACK 05/15/99 CTD HORIZ SIDETRACK 11114107 N2ES SIDETRACK PRUDHOE BAY UNfT V11El.1: 14-188 PERMIT No: 1980070 API No: SO-029-20551-02 SEC 9, T10N, R14E, 5132.29 FEL 1881.93 FNL BP E:plo~ation (Alaska) · . ~1f~1fŒ (ID~ ~~~~[K\~ / ;t.USJi.&. OIL.&lVD GAS / CONSBRVATION COMMISSION / SARAH PALIN, GOVERNOR 333 W. 7th AVENUE. SUITE 100 ANCHORAGE, ALASKA 99501-3539 PHONE (907) 279-1433 FAX (907) 276-7542 Greg Hobbs Senior Drilling Engineer BP Exploration Alaska, Inc PO Box 196612 Anchorage, AK 99519-6612 Re: Prudhoe Bay Field, Prudhoe Bay Oil Pool, PBU 14-18A t1 Sundty Number: 307 -285 \C\~ ~ dJ I SCANNED SE P 1 1 2007 Dear Mr. Hobbs: Enclosed is the approved Application for Sundry Approval relating to the above referenced well. Please note the conditions of approval set out in the enclosed form. When providing notice for a representative of the Commission to witness any required test, contact the Commission's petroleum field inspector at (907) 659-3607 (pager). As provided in AS 31.05.080, within 20 days after written notice of this decision, or such further time as the Commission grants for good cause shown, a person affected by it may me with the Commission an application for rehearing. A request for rehearing is considered timely if it is received by 4:30 PM on the 23rd day following the date of this letter, or the next working day if the 23rd day falls on a holiday or weekend. A person may not appeal a Commission decision to Superior Court unless rehearing has been requested. n . orm Chairman DATED this i day of September, 2007 Encl. f)7S rllí'. 7· STATE OF ALASKA cpt '''1 ~RECEIVED .. ".~ ALASKA Oil AND GAS CONSERVATION COM SION Þ AUG 2 8 Z007 APPLICATION FOR SUNDRY APPRO V ALi !~,~;\" . . 20 AAC 25.280 )lp,.KaJa & Gas Cons. CommIssIon 1. Type of Request: ~ Abandon / o Suspend o Operation Shutdown o Perforate o Time Extension Ancnorage o Alter Casing o Repair Well o Plug Perforations o Stimulate o Re-Enter Suspended Well o Change Approved Program o Pull Tubing o Perforate New Pool o Waiver o Other 2. Operator Name: 4. Current Well Class: 5. Permit To Drill Number BP Exploration (Alaska) Inc. ~ Development 0 Exploratory 198-007 - 3. Address: o Service o Stratigraphic 6. API Number: P.O. Box 196612, Anchorage, Alaska 99519-6612 50-029-20551-01-00 - 7. If perforating, closest approach in pool(s) opened by this operation to nearest 8. Well Name and Number: property line where ownership or landownership changes: PBU 14-18A - Spacing Exception Required? DYes ~No 9. Property Designation: 110. KB Elevation (ft): 11. Field / Pool(s): ADL 028312 - 71' , Prudhoe Bay Field / Prudhoe Bay Pool - tt.Y.Yii>iiYv»j'yijiiiiV·iyiCi ········iCii·..·CC...·iYYi·...· i.·...... i>·.· '.' .Yii·C.>Y>iC,ii;< ;C...;···· i·i.i··/>i. ··i.. .....'" ''11 VI Total Depth MD (ft): Total Depth TVD (ft): Effective Depth MD (ft): Effective Depth TVD (ft): Plugs (measured): Junk (measured): 10815 I 8740 10773 8740 None None Ca!;inn Lenath Size MD TVD Burst Collaose Structural Conductor 80' 20" 80' 80' 1530 520 Surface 2651' 13-3/8" 2651' 2651' 4930 2670 Intermediate 9266' 9-5/8" 9266' 8701' 6870 4760 Production Liner 372' 7" 8913' - 9285' 8411' - 8721' 8160 7020 Liner 1090' 3-1/2" x 3-3/16" 8898' - 9988' 8405' - 8766' 10160 10530 Liner 91R 2-3/8" 9R86' - 10804' 8766' - 8740' 11200 11780 Perforation Depth MD (ft): I Perforation Depth TVD (ft): I Tubing Size: Tubing Grade: Tubing MD (ft): Slotted: 10266' - 10773' 8750' - 8740' 4-1/2", 12.6# L-80 8960' Packers and SSSV Type: 9-518" x 4-1/2" Baker 'SB-3A' packer I Packers and SSSV MD (ft): 8836' 13. Attachments: 14. Well Class after proposed work: ~ Description Summary of Proposal o BOP Sketch o Exploratory ~ Development o Service o Detailed Operations Program 15. Estimated Date for 16. Well Status after proposed work: CommencinQ Operations: September 15, 2007 o Oil o Gas o Plugged ~ Abandoned 17. Verbal Approval: Date: o WAG OGINJ OWINJ o WDSPL Commission Representative: 18. I hereby certify that t~~ forgoing is true and correct to the best of my knowledge. Contact Jim Nigh, 564-5220 Printed Name Gre Title Senior Drilling Engineer f/1 ffl I) Prepared By Name/Number: Signature ..J.. jI /' Phone 564-4191 Date r/.?)þf Terrie Hubble, 564-4628 ..:;.. ¿;.¡ 'l.- /I, 7 Commission Use On Iv Conditions of approval: Notify Commission so that a representative may witness I Sundry Number: fY'>7..aA5 o Plug Integrity ~OP Test o Mechanical Integrity Test o Location Clearance Subsequent Form Required: ~\)~ - OJ!,., ~c- ··....s,ONER APPROVED BY f'-(rf) 1- Approved By: THE COMMISSION Date Form 10-403 Revised 06/2006 V\ RBDMS BFl SEP 1 0 20D7 Submit In Duplicate ORIGIN Al! ~? . . G To: AOGCC Date: August 28, 2007 From: Jim Nigh - BPXA GPB Rotary Drilling Subject: 14-18A Application for Sundry Approval- P&A for Sidetrack Operations The purpose of this sidetrack is to create offtake in the Sag River Formation. This new sidetrack will replace 14-18A, which has been a long term shut-in well since 2000 The Ivishak reservoir (e.g. Z4) will be completed if it turns out to be economically attractive. Should the Ivishak reservoir be completed, the Sag target will be preserved as a future CTD candidate. N2ES will pull the existing tubing string before the well is sidetracked at -4,300' to the 8.5" TD at -11,056' to top set the Sag River. A 7" liner will be run, fully cemented. A 6-1/8" pilot hole will be drilled out of the 7" shoe down to the Ivishak. Depending on the logging results, the Asset Team may case and produce this pilot hole (via cemented and perforated solid liner) or plug it back with cement and drill horizontally into the Sag for -2,500' to a TD of 13,552' MD. This horizontal production hole will be completed with a 4-1/2" slotted liner. A 4-1/2" chrome tubing string will be run for production. ~;__t-~_ Jim Nigh GPB Rotary Drilling Engineer Ph: 564-5220 I ~- ,~It O"ty \,VtlL f !art waJ J,7; I OF froJIICf/O~ to aba,JrJl It Jp di",'//"r/ q5 t?/í'ý/"~/~ 1/¡;,/1I?t'~ ~"17 /i /levU "b ~ 0 . J T~ /' {,r lie It'¿>§ I'~/ dJI) r __ /JltillAJ Jpr,'þ7'Ij/ {ectt:¥1, C¡IIQf f I t( e I" ~; (i(v""r?'7 2. vv- V' r 0"4 ()I ¡I1'Mrl¡ ~ í 'tyQ ~ e, "/ I I rI /5"0 ovlJ fpl ~ ((7vll, ~ /' JIll" u, e(Ctllf!¢~ . J I.'?' ·-.It ð v , II a",J 7/UfTf""'* b /j Qlf'o, r,'w, ~, e"'~t¡f/ "'f ~ ~17 14-18B Application for Sundry . . 14-188 Operations Summary Pre-Riq Operations: 1 E Run gyro surveys in the X-15A and 14-19 wells for anti-collision prevention. Report results to ODE ASAP. P&A the 14-18A well bore with CT. Place CIBP just above top of 2-3/8" liner (at -9,886' MD). Lay in -9 bbls of 15.8 ppg cement on top of CIBP, leaving TOC approximately at the 4-1/2" tubing packer depth (-8,836' MD). Cement volume calculated on the following parameters: Cement Calculations: 2 C 9,886'-9,254 ' 3-3/16" LNR, 6.2# L-80, 0.0076 bpf -4.8 bbls 9,254 '-8,898' 3-1/2" LNR, 8.8#, L-80, 0.0087 bpf -3. 1 bbls 8,898'-8,836' 4-1/2" TBG, 12.6#, 9-CR, 0.0152 bpf - 1 bbl Total cement 9 bbls BHT = 218 deg F BHP = 3,200 psi .,--""",", 3 S RIH and drift the tbg to tag TOC. POOH. 4 E RU E-line and RIH. Jet cut the 4-1/2" tbg in a middle of a joint at -6,000' MD. CMIT T X IA to 3,500psi for 30 minutes.* Pressure test OA to 2,000 psi.* Displace the well to 5 F clean seawater by circulating down the tubing through the tubing cut. Continue to circulate until clean seawater returns to surface. Freeze protect to -2,200' MD with diesel. Bleed casing and annulus pressures to zero. 6 W PPPOT-T and PPPOT-IC. Function all lock down screws, repair or replace as needed. Set a BPV in the tubing hanger. Test to 1,000 psi from IA. Secure the well. Remove the well 7 0 house, level the pad as necessary. Please provide total well preparation cost on the handover form. * Already on WBL RiÇl Operations: 1. MI I RU Nabors rig 2ES. 2. Pull BPV. Circulate out diesel freeze protection and displace the well to seawater. 3. Set TWC. Nipple down tree and adaptor. Nipple up and test BOPE to 3,500 psi. Pull TWC. 4. Back out lockdown screws, pull hanger (WSL may want a spear on location). 5. Pull 4-1/2" tubing from the pre-rig cut at -6,000' MD. 6. P/U drill pipe. MU/PU scraper assembly. RIH, picking up DP, to the 4-1/2" tubing stub, and circulate the well bore with 9.8ppg brine. #/~ 7. RU E-line, run USIT. USIT results will be used to determine the 9-5/8" cement picture and to evaluate the ~;:.. condition of the 9-5/8". Note: According to available well file data, there appears to be no cement behind ~ the 9-5/8" casing at the 4,300' planned KOP. ~ 8. Rig up E-line, MU a 9-5/8" EZSV on DP, RIH and set at -4,330' MD, test to 4000 psi. ~ 1 9. PU 9-%" whipstock and TIH to EZSV at 4,325', orient and set whipstock on bridge plug. Shear off whipstock, POOH. t 10. Displace to 9.5 ppg fresh water LSND milling fluid (per MI). 11. Mill window In 9-518" casing at ± 4,3UU IVIU, piUS approxlmamly 20 frolll lIIid window. Clrculat~ well bore clean. 12. Pull up into 9 5/8" casing and conduct an FIT to 12.0 ppg EMW. POOH. 13. M/U 8-1/2" Dir/GR/RES/PWD RSS wi gamma at bit assembly. 14-18B Application for Sundry . . 14. RIH to window. Drill ahead to TD at 11,056' per directional plan to the 7" casing point, allowing mud weight to increase to 9.8ppg. May have to trip for a new bit (pre-planned contingency). Mud wt. should be weighted up to ~ 11.5 ppg to with to directional -- contact 150' before drilling HRZ. 15. Circulate the well bore clean. Short trip, circulate the well bore. POOH, UD assembly. 16. Change out to 7" rams and test. 17. RU I MU I RIH 7" liner to bottom on drill pipe, circulate and condition the hole 18. Cement the entire 7" liner through the 8-1/2" hole a minimum of 150' across the 7" x 9-5/8" lap at 4,300'. Set the hanger and packer. Displace cement with mud. Cementing will be done in two stages. 19. Circulate bottom up, POOH. UD liner running tool. 20. Change out to variable rams and test. 21. MU clean-out assembly. 22. RIH to HES cementer and test casing to 3,500 psi. 23. Drill out of HES cementer and test casing to 3,500 psi. 24. RIH to 7" liner landing collar. Drill out of the cement and float equipment to shoe. Test casing to 3,500 psi, record the test. 25. Displace to 8.5 ppg Flo Pro drilling fluid. 26. POOH for directional drilling BHA. 27. MU 6-1/8" BHA with DIR/GR/RES/Az Den-Neu/Near bit gamma on a bent motor. 28. RIH, and drill out of the 7" shoe plus 20' of new formation. Pull up into the shoe and conduct FIT to 8.8 ppg mud EMW. 29. Drill hole to TD in the Ivishak formation at 11,677' MD. 30. CBU, Short trip, circulate and condition the hole. POOH. 31. Based on this hole section's evaluation results (whether or not it has been water 'swept'. Ref SOR Section 7) and the ODE's direction, execute one of these two options: a. Complete Ivishak Pilot hole with a cemented and perforated, solid liner b. Plug back pilot hole with cement, kick off, and drill horizontally in the Sag River Option A - Complete Ivishak Production Hole 32. Run and cement a 4- W', 12.6#, L-80 IBT -M solid liner. Ensure that there is 150' of overlap from the 7" shoe. Set liner hanger and liner top packer. Displace well to clean seawater above the liner top. 33. RU Schlumberger and RIH wi TBD' 2-Ya" 2906 Powerjet guns set @ TBD SPF. Tag PBTD. 34. Put guns on depth and fire. POOH and verify all shots fired. 35. Skip to 'COMPLETION' section of operations Option B - Plug back pilot hole with cement, kick off, and drill horizontally in the Sag River 36. RU SLB Cementer. RIH and plug back pilot hole. 37. POOH for 6-1/8" horizontal BHA with a PDC bit and ABI/GR/Res/Az Den-Neu/Stratasteer/near bit gamma on bent motor. 38. RIH to the bottom, kickoff cement plug, drill ahead build section. Trip for new motor. 39. RIH with less aggressive bend motor, drill horizontal section to planned TD at 13,552'. 40. CBU, Short trip, circulate and condition the hole for running the 4-1/2" slotted liner. POOH, UD excess drill pipe. Clear the floor of unnecessary equipment. 41. RU, MU TBD length of 4-1/2" slotted liner plus TBD length of blank 4-1/2" 12.6#, L-80, BTC-M liner for overlap into the 7" liner. 42. RIH to shoe, circulate string. RIH to bottom, circulate and condition the hole. 43. Release, set packer, circulate bottom up. 44. POOH. UD liner running tool. 45. RU, test BOPE if needed. 46. Test casing and liner. 47. Continue to 'COMPLETION' section of operations 14-188 Application for Sundry . . COMPLETION 48. R/U, M/U TBD length (depending on whether Option A or B is executed) of 4-1/2" 13CR, Yam Top completion tubing. 49. RIH, space and land the completion tubing into the 4-1/2" liner top, RILDS. 50. Reverse circulate to seawater and corrosion inhibitor. 51. Drop ball and rod, set packer. 52. Test tubing and annulus separately to 4,000 psi each, record the test. 53. Install and test TWC. 54. Nipple down BOPE. 55. Nipple tree and adaptor flange, test tree to 5,000 psi. Pull TWC. 56. Reverse in diesel freeze protect to -2,200' U-tube. Install BPV. 57. Secure well. Release rig. Post-Ri~ Operations: 1 0 Install well house and flowlines. New S-riser will be manufactured. 2 S MIRU slick line. Pull the ball and rod 1 RHC plug from 'XN' nipple. Install gas lift valves. Estimated Pre-rig Start Date: Estimated Spud Date: 09/1 512007 1 0/1 5/2007 14-188 Application for Sundry IIVELLHEAD = ACTUATOR = KB. ELBI = BF. ELBI = KOP= ll/ax A n9 Ie = Datum MD = Datum lVD = GRAY AXELSON t \A.~"E' "" ..... 14-18A 5300' ---- 99 @ 10227' 9558' 8800'SS I 13-3/8" CSG, 72#, L-BO, ID = 12.347" I 2651' 14-1/2" TBG-IPC, 12.6#, L-BO, 0.0152 bpf, ID= 3.95B" H I TOP OF 4-1/2" TBG-CR H 8875' 8875' ITOPOF3-1/2" LNR H ITOP OF 7" LNR 1 Minimum 10 = 1.996" @ 9886' GS FISHING NECK 8898' 8913' 14-1/2" TBG, 12.6#, 9-CR, 0.0152 bpf, ID = 3.958" 8960' 13-1/2" LNR, 8.8#, L-80, FL4S, .0087 bpf, ID = 2.992" 1 TOP OF 3-3/16" LNR 1 9-5/8" CSG, 47#, L-80, ID = 8.681" 1 1 TOP OF 2-3/8" LNR H 9886' 3-3/16" LNR, 6.2#, L-80, .0076 bpf, ID = 2.80" 1-1 9986' PERFORA TION SUMMARY REF LOG: JEWELRY 10G ON 08/28/98 ANGLE AT TOP PERF 98 @ 10266' Note: Refer to Production DB for historical perf data SIZE SPF INTERVAL OpnlSqz DATE 2-318" 2 10266 - 10773 0 05/15/99 SAFETY NOTES: 700@9397' AND 90° @9468' 2263' -1 4-1/2 OTIS HRQ SVLN NIP, ID -? GAS LIFT MANDRELS ST MD lVD DEV TYPE VLV LATCH PORT DATE 1 3074 3074 0 MMG RK 5607 5595 19 MMG RK 3 7537 7284 32 MMG RK 4 8220 7854 36 MMG RK 5 8746 8280 35 MMG RKP I 8776' H 4-112" PARKER SWS NIP, ID = 3.813" I 8836' H 9-5/8" X 4-1/2" BAKER SB-3A PKR I I 8876' H 4-112" PARKER SWS NIP, ID = 3.810" I 8898' H 3-1/2" BAKER SETTING SLV I 8944' 4-1/2" PARKER SWN NIP, ID = 3.73" (BEHIND LNR) 8960' H 4-1/2" TUBINGTAIL (BEHIND LNR) 8965' H ELMD TT LOGGED OB/2B/9B 9254' H 3-1/2" X 3-3/16" XO I I 7" MILLOUT WINDOW @ 9289' 12-3/B" PRE-DRLD LNR, 4.6#, .0037 bpf, ID = 1.995" H 12-3/8" LNR, 4.6#, .0037 bpf, ID = 1.995" 1-1 DATE 1981 04/13/98 05/15/99 02/27102 09/24103 RBI BY RNlTP BHClKK COMMENTS ORIGINAL COMPLETION RIG SIDETRACK CTD HORlZ SIDETRACK CORRECTIONS LINER TOP CORRECTION DATE RBI BY COMMENTS PRUDHOE BAY UNIT WELL: 14-18A PERMT No: 1980070 API No: 50-029-20551-01 SEC9, T10N, R14E, 5132.29 FEL 1881.93 FNL BP Exploration (Alaska) WELLHEAD = ACTUATOR= KB. B.E:V = BF. ELE:V = KOP= Max Angle = I:8tum MD = I:8tum TVD = GRAY AXELSON 71' t>~o~SGº 14-18A I SAFETY NOTES: 700 g 9397' AND 900 g 9468' 5300' 99 @ 10Z27' 9558' 8800' SS 4-112" Jet Cut 6000' 2263' -i 4-1/2 OTIS HRQ SVLN NIP, ID = ? GAS LIFT Ml\NDRELS DEV TYÆ VLV LATCH PORT o MMG RK 19 MMG RK 32 MMG RK 36 MMG RK 35 MMG RKP ~TE 13-3/S" CSG, 72#, L-SO, ID = 12.347" I 2651' ST IVD TVD 1 3074 3074 5607 5595 3 7537 7284 4 8220 7854 5 8746 8280 I Cement 8836' 8776' H 4-112" PARKER SWS NIP, ID = 3.S13" 8836' H 9-5/S" X 4-1/2" BAKERSB-3A PKR I 8876' H 4-1/2" PARKER SWS NIP, ID = 3.S1 0" 8898' H 3-1/2" BAKER SETTING SLV I TOP OF 7" LNR Minimum 10 = 1.996" @ 9886' GS FISHING NECK 8944' 4-112" PARKER SWN NIP, ID = 3.73" (BEHIND LNR) 4-112" TBG, 12.6#, 9-CR, 0.0152 bpf, ID = 3.95S" 8960' 8960' H 4-1/2" TUBING TAIL (BEHIND LNR) 8965' H ELMD TT LOGGED 08128/9S 9254' H 3-1/2" X 3-3/16" XO I 13-1/2" LNR, 8.8#, L-SO, FL4S, .00S7 bpf, ID = 2.992" 9-5/S" CSG, 47#, L-SO, ID = 8.6S1" I I 7" MLLOUT WINDOW @ 9289' I TOP OF 2-3/S" LNR H 9886' 3-3/16" LNR, 6.2#, L-BO, .0076 bpf, ID = 2.SO" H 9986' ~ 9886' H CIBP PERFORATION SUMMl\RY REF LOG: JEWELRY 10G ON 08J28f98 ANGLEAT TOP ÆRF: 98@ 10266' 10773' Note: Refer to A-oduction DB for historical perf data SIZE SPF INTERVAL OpnlSqz CV\TE 2-3/8" 2 10266 - 10773 0 05/15199 12-318" PRE-DRLD LNR, 4.6#, .0037 bpf, ID = 1.995" H 12-3/8" LNR, 4.6#, .0037 bpf, ID = 1.995" H DATE REV BY 1981 04113198 05115199 02127102 RNfTP 09124103 BHClKK COM'ÆNTS ORIGINAL COMPLETION RIG SIDETRACK CTD HORIZ SIŒTRACK CORRECTIONS LINER TOP CORREC1l0N [}ð.TE REV BY COMMENTS PRUDHOE SAY UNIT WELL: 14-18A PERMT No: 1980070 AA No: 50-029-20551-01 see 9, T10N, R14E, 5132.29 FEL 1881.93 FNL BP Exploration (Alas ka) Well Compliance Report File on Left side of folder 198-007-0 PRuDHOE BAy~T i42i8A ...... 502 02922'055i20i ~0 · MD 10815 ' TVD 0~'~/41 c~ompletion Date: ~30/98 Completed Status: 1-OIL Current: T Name Interval Sent Received T/C/D D 8449 SPERRY GR OH 7/8/98 7/8/98 D 9059 ~ BH GR OH 10/15/99 10/19/99 D 9068 ~ BH GR OH 11/22/99 11/30/99 D 9069 ~ BH GR PB4 OH 11/10/99 11/30/99 L GR-MD ~NAL 9243-10433 PB3 OH 10/15/99 10/19/99 L GR-MD ~J~IlqAL 9245-10803 PB4 OH 2/5 11/30/99 11/30/99 L GR-TVD ~"INAL 8580-8661 PB3 OH 10/15/99 10/19/99 L GR-TVD 6~E~LD 8674-8696 ~ . ~t~ OH 2/5 11/16/99 11/30/99 L GR-TVD ,~'INAL 8674-8696 PB4: OH 2/5 11/30/99 11/30/99 L NGP-MD Cj~AL 9225-9987 OH '7/22/98 7/22/98 L NGP-TVD ~tVINAL 8599-8695 OH 7/22/98 7/22/98 R SRVY LSTNG e~'~I~i 9948.56-10813 OH 6/7/99 6/7/99 R SRVY LSTNG .~3~i 9948.57-10799. PB4 OH 6/7/99 6/7/99 R SRVY LSTNG j 9948.57-10433. PB3 OH 6/7/99 6/7/99 R SRVY RPT , t~ERRY 9200.-9948.57 ' OH 7/13/98 7/22/98 Daily Well Op _ Are Dry Ditch Samples Required? yes d~_~-~And Received~ Was the well cored? yes ~_________~, Analysis Descriptiog-geeeivt~7--. ye~~'~no Sample S~'t'~ Comments: Monday, May 01, 2000 Page 1 of l '--- STATE OF ALASKA ' ASKA OIL AND GAS CONSERVATION COMMISSION APPLICATION FOR SUNDRY APPROVALS 1. Type of request: Abandm_ Suspend_ Ope~a~oo Shutdown _ Reenta' suspended well _ Resume operations Nter casing _ Repair well_ Rugging_ Time extension_ Stimulate_ after operation Change acproved program Pull ~bing _ Vadance _ Perforate_ o,,~r _x shutdown 2. Name of Operator. 5. Type of Well: 6. Datum of elavafion (DF or KB feet): ARCO Alaska, Inc. D~etopment_X 71' RKB 3. Add~: Expimato~,y_ 7. Unit or Property: P.O. Box 100360 St~atagrapic _ Anchorage, AK 99510-0360 set, ce Prudhoe Bay Unit 4. Location of well at surface: 8. Well number. 1659' FNL, 1783' FEL, Secg, T10N, R14E, UM 14-18A Attep of productive interval: 9. Permit number. 98-07 At effective depth: 10. APl number. 50-029-20551-01 Attotal depth: 11. Field/Pod: 1557' FNL, 4673' FEL, of NW crSec 9, T10N, R14E, UM Prudhoe Bay Oil Pool 12. Present wetl condition sum mary ,., Total Depth: measured 10260 feet Plugs (measured) true vertical 8773 feet ....... ! ;J .J. .._: Effective Depth: measured 10260 feet Junk (measured) ,,, ! ~-,~ Casing Length Size Cemented Ueasured depth True vertical depth Conductor 80' 20' 300 Sx PF 80' 80' Surface 2580' 13-3/8" 2615 Sx Fondu & 2651' 2651' 400 Sx AS II Production 9195' 9-5/8" 500 Sx Class G 9266' 8708' Liner 375' 7" 450 Sx Class G 9288' 8725' Uner 356' 3-1/2" 3o bus ~$.8 ppg Latex C~as~ G 9254' 8698' Uner 734' 3-3/16 ...... 9988' 8767' Perforation Depth measured N/A *Open hole from 9988'- 10260' u.w c, N,, ORIGINAL Tubing (size, grade, and measured depth) 5-1/2", 17#, L-80, 'rbg @ 32' MD; 4-1/2", 12.6#, US0, IPC 'rbg @ 8875' MD; 4-1/2', 12.6~, IPC Tbg @ 8960' MD. Packers and SSSV (type and measured depth) Baker SB-3A Packer @ 8836' MD; 4-1/2' Otis HRQ SVLN @ 2263' MD. Plan to resume drilling as of 3/1/1999. 13. Attachments Descrip~on summary of proposal _X Detailed operations program _ BOP sketch _ 14. Estimated date for commencing operation 15. Status of well classification as: November, 1998 Oil _x Gas _ Suspended _ 16. If proposal was verbally approved Name of appmver Date appmvod Service FOR COMMISSION USE ONLY Prepa~:tbyPau/Ra{/263.4990 Plug integrety_ BOP test._~ Location clearance _ G ~0~ Mechanical integretytest_ Subsequent form required 10- ~e~.u - ~ ORiGiNAL SiGNED. BY  v~t.~ Robert N. Chdstenson Cd 10-403 Rev 06/15/88 SUBN T IN TRIPUCATE DS 14-18A CT Drilling Completion Intended Procedure Background: Well 14-18A was sidetracked from 4/12/98 to 4/30/98. The Shublik Interval was drilled as planned and a liner cemented in place. After drilling out 272 feet into the Sag River Formation, CTD operations were suspended due to MWD problems. Target TD was not achieved. Arco attempted to produce this well but it was uneconomic. Plans are to return to the well to complete ddlling operations. Permit to Drill #98-07 was approved on 1/22/98. The operations below are consistant with the odginal ddlling permit. Ddlling operations are planned to resume around March 1, 1999. Intended Procedures: Directionally drill 2-3/4" x -2000' horizontal well to access Sag reserves. Drilling will start at approximately 10260' in the existing open hole. Crude will be used as the drilling fluid to help overcome fluid loss problems encountered during the previous drilling of the Sag interval in this well. A new MWD system will be run due to problems encountered in getting a signal in the MWD tools originally used. Run 2-3/8" slotted liner to TD. Return well to production. TUBING CASING CASING XO TUBING-IPC NIP NIP PKR NIP TUBING-CR OTHER LINER OTHER NIP LINER TTL 9253' Minimum ID=2.786 Crossover 3~1/2 X 3-3/16 XO LINER 9289' 7" Side Track Window Depth ID 32 0.00 2263 0.00 8776 0.00 8836 0.00 8876 0.00 8898 0.00 8902 0.00 8944 0.00 8960 0.00 9253 0.00 9986 0.00 Safety Notes Date Note 14-18A APl: 500292055101 Well Type: PROD H2S: Spud: 4/7/98 SSSV Type: Odg Compltn: 4/30/98 Annular Fluid: Last W/O: Reference Log: Ref Log Date: Last Tag: Last Tag Date: Rev Reason: Side Track Last Update: 10/23/98 Depth Annotations Depth Comment (ftKe) 9253.00 9253' Minimum ID=2.786 Crossover 3-1/2 X 3-3/16 9289.00 9289' 7" Side Track Window Elevations KB 71 ff Cas Flng Grd 34 ft Tub Head KB-Grd 37 ft Other (plugs, equip., etc.) - All Type Description XO Crossover 5-1/2 X 4/-1/2 NIP 4-1/2 Otis HR! SVLN Nipple ID=3.81 NIP 4-1/2 Parker SWS Nipple ID=3.81 PKR 9-5/8 X 4-1/2 Baker SB-3A Packer NIP 4-1/2 Parker SWS Nipple ID=3.81 OTHER 3-t/2 Baker Setting Sleeve ID=3,5 OTHER 3-1/2 Pup Joint ID=2.917 NIP (Behind Liner) 4-1/2 Parker SWN Nipple ID=3.73 TTL (Behind Liner) 4-1/2 Tubing Tail XO Crossover 3-1/2 X 3-3/16 ID=2.786 'l-rL 3-3/16 Baker Float Shoe 2/8/95 GLM Stn#s - Pulled 1/2 of latch off 2/8/95 10/1/97 Ran EQ Prong 10/1/97 General Notes Date Note 7/3/92 8940' 4-1/2 ELM Tubing Tail (logged 7/3/92) 5/1/98 CTD Sidetrack completion Casing Strings - All Size Description 13.38 CASING 9.63 CASING 3.50 LINER 7.00 LINER 3.50 LINER Tubing Strings - All Size Description 5.50 TUBING 4.50 TUBING-IPC 4.50 TUBING-CR Gas Lift Mandrels/Valves Stn MD Man Man Type Mfr 1 3074 CA MMG 2 5607 CA MMG 3 7537 CA MMG 4 8220 CA MMG 5 8746 CA MMG RKB: 71 ft KOP: 0.00 ftKB PBTD: 10260.00 ffKB TD: 10260.00 ftKB Max Hole Angle: 98 deg @ 9526 Angle @ TS: dog @ Angle @ TD: 83 deg @ 12260 Off Off Top Btm Weight Grade 0 2651 72.00 L-80 0 9266 47.00 L-80 8898 9253 8.81 L-80 FL4S 8913 9289 29.00 L-80 9254 9986 8.81 L-80 Perforations Summary Interval Zone 9986 - 10260 Top o 32 8875 Btm Weight 32 17.00 8875 12.60 8960 12.60 Vlv Vlv Vlv Latch Vlv Vlv Mfr OD Type Port TRO (in) CA 1.50 GLV RK 0.25 1745 CA 1.50 GLV RK 0.25 1701 HES 1.50 RK 0.00 CA 1.50 OV RK 0.38 CA 1.50 RKP 0.00 Status Feet SPF Date Type c 274 0 5/1/98 Sqz Grade L-80 L-80 9CR Vlv Run VIv Comment 5/3/98 5/3/98 2/8/95 5/3/98 5/26/92 GLM: Pulled 1/2 of latch off 2~8~95 Ran EQ Prong 10/1/97 Comment Open Hole TTL WELL LOG TRANSMITr.M_, To~ State of Alaska Alaska Oil and Gas Conservation Comm. Attn.: Lori Taylor 3001 Porcupine Dr. Anchorage, Alaska 99501 MWD Formation Evaluation Logs D.S. 14-18A, July 22, 1998 AK-MW-80188 The technical data listed below is being submitted herewith. Please address any problems or concerns to the attention of.' Ali Turker, Sperry-Sun Drilling Services, 5631 Silverado Way, ,~:G, Anchorage, AK 99518 D.S. 14-18A: 2" x 5" MD Gamma Ray Logs: 50-029-20551-01 2"x 5" TVD Gamma Ray Logs: 50-029-20551-01 1 Blueline 1 Folded Sepia 1 Blueline 1 Folded Sepia 5631 Silverado Way, Suite G · Anchorage, Alaska 99518 · (907) 563-3256 · Fax (907) 563-7252 A Division of Dresser Industries, Inc. WELL LOG TRANSMITTAL · To: State of Alaska Alaska Oil and Gas Conservation Comm. Attn.' Loft Taylor 3001 Porcupine Dr. Anchorage, Alaska 99501 MWD Formation Evaluation Logs - D.S. 14-18A, July 8, 1998 AK-MW-80188 The technical data listed below is being submitted herewith. Please acknowledge receipt by returning a signed copy of this transmittal letter to the attention of.' ,a2i Turker, Sperry-Sun Drilling Services. 5631 Silverado Way, #G, Anchorage, ~M<: 99518 1 LDWG formatted Disc with verification listing. APl#: 50-029-20551-01. 5631 Silverado Way, Suite G · Anclnorage, Alaska 99518 ° (907) 563-3256 ° -Fax (907) 563-7252 A Dresser Industries, inc. Company SEll:tUll--ES 13-Jul-98 AOGCC Lori Taylor 3001 Porcupine Drive Anchorage, AK 99501 Re' Distribution of Survey Data for Well 14-18A Dear Lori Taylor: Enclosed are two survey hard copies. Tie-on Survey: Window / Kickoff Survey: Projected Survey: 9,200.00' MD 9,285.00' MD 9,948.57' MD (if applicable) Please call me at 563-3256 if you have any questions or concerns. Regards, William T. Allen Survey Manager Attachment(s) RECEIVED JUN ? 2 1998 Alaska Oil & Gas Cons. ~mln~ion Anchorage 5631 Silverado Way, Suite G · Anchorage, AJaska 99518 · (907) 563-3256 · Fax (907) 563-7252 A Dresser Industries, Inc. Company STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMMISSION '---~' APPLICATION FOR SUNDRY APPROVALS f. Type of request: N(e~ casing _ Change ~p~oved p~ogram _ Ab~nd(~ _ Suspend _ Operai~on Shutdown _ Repair wall _ Rugging _ '~me exlens~en _ Pull tubing _ Variance _ Peri'orate_ Reenta' suspen~led well_ ~e(:;~ 0~;3 Chef _X Name of Operator. ARCO Alaska, Inc. t5. Type of Well: Development _X Exploratory_ Sb'atagr~oic _ Service _ 3. Address: P.O. Box 100360 Anchorage, AK 99510-0360 4. Location of well at sudace: 1659' FNL, 1783' FEL, Sec 9, T10N, R14E, UM At top of productive intaval: At effective depth: At total depth: 1557' FNL, 4673' FEL, of NW crSec 9, T10N, R14E, UM 12. Present well condition summary Total Del)th: measured 10260 feet true vertical 8773 feet Effective Depth: measured 10260 feet true vertical 8773 feet Casing Length Size Conductor 80' 20" Sudace 2580' 13-3/8" 6. Datum of elavation (DF or KB feet): 71' RKB 7. Unit or Property: Prudhoe Bay Unit 8. Well number: 14-18A 9. Permit number:. 98-07 lO. APl number: 50-029-20551-01 11. Field/Pool: Prudhoe Bay Oil Pool Plugs (measured) Junk(measured) Cemented 300 Sx PF 2615 Sx Fondu & 400 Sx AS II Production 9195' 9-5/8" 500 Sx Class G 9266' 8708' Liner 375' 7' 450 Sx Class G 9288' 8725' Liner 356' 3-1/2" 30 bus 15.8 Pm Lalex Class G 9254' 8698' Liner 734' 3-3/16 ...... 9988' 8767' M~sured depth True ve~ical depth 80' 80' 2651' 2651' ~erforation Depth measured N/A true vertical N/A *Open hole from 9988'- 10260' *Open hole from 8767'- 8773' Tubing (size, grade, and measured depth) 5-1/2', 17#, L-80, 'l'bg @ 32' MD; 4-1/2', 12.6#, L-80, IPC 'l'bg @ 8875' MD; 4-1/2", 12.6#, IPC 'rbg @ 8960' MD. Packers and SSSV (type and measured depth) Baker SB-3A Packer @ 8836' MD; 4-1/2" Otis HRQ SVLN @ 2263' MD. 13. Attachments 14. Estimated date for commencing operation Description summary of proposal _X November, 1998 16. If proposal was ve,'bally approved Name of approver Date approved 7. I hereby certify that the forgoing is true and correct to the best of my knowledge. Detailed operations proc, lram _ BOP sketch _ t15. Status of well classification as: Oil _X Gas _ Service Conditions of approval: Not~ Com~sion so representrtive may wrtness Title: Engineering Supervisor FOR COMMISSION USE ONLY Suspended_ Ques#ens: Call Dan Kara at263-4837 or Sieve Ward at 265-1305. Date F~e~d mO Oy Paul Ra L~ 2~-4 9~O Plug integrety_ ~ C~O~'~ Mechanical integrety tesl _ Ap. prdved by order ct the Commissioner Form 10-403 Rev 0Et5/8<3 BOP test ~ Location clearance_ Subsequentform required 10- ~ '7' Urlglnal S,~,,,r.J ~y David W. Johnston Commissioner Date DS 14-18A CT Drilling Completion Intended Procedure Background: Well 14-18A was sidetracked from 4/12/98 to 4/30/98. The Shublik Interval was ddlled as planned and a liner cemented in place. After drilling out 272 feet into the Sag River Formation, CTD operations were suspended due to MWD problems. Target TD was not achieved. Plans are to return to the well to complete drilling operations. Permit to drill #98-07 was approved on 1/22/98. The operations below are consistant with the original drilling permit. Intended Procedures; Directionally drill 2-3/4" x -2000' horizontal well to access Sag reserves. Drilling will start at approximately 10260' in the existing open hole. Crude will be used as the drilling fluid to help overcome fluid loss problems encountered during the previous drilling of the Sag interval in this well. A new MWD system will be run due to problems encountered in getting a signal in the MWD tools originally used. Run 2-3/8" slotted liner to TD. Return well to production. STATE OF ALASKA ALAS~F~ OIL AND GAS CONSERVATION coMM-i~SION WELL COMPLETION OR RECOMPLETION REPORT AND LOG 1. Status of well Classification of Service Well Oil r~ Gas BI suspended BI Abandoned F~ Service BI 2. Name of Operator 7. Permit Number ARCO Alaska, Inc. 98-07 3. Address 8. APl Number P. O. Box 100360, Anchorage, AK 99510-0360 50-029-20551-01 4. Location of well at surface,i~~. ~ 9. Unit or Lease Name 1659' FNL, 1782' FEL, SEC. 09, T10N, R14E, UM ' .:"' ;~ ii :':.;.-'.i~'; i' Prudhoe Bay Unit 1355' FNL, 3748' FEL, SEC 09, T10N, R14E, UM i i, ' , · [ i 14-18A At Total Depth i i;~i!~! ~i 11. Field and Pool 1883' FNL, 5130' FEL, SEC 09, T10N, R14E, UM ,..;'....: ,:~i.*~..., Prudhoe Bay Field 5. Elevation in feet (indicate KB, DF, etc.) 16. Lease Designation and Serial No. RKB 71 feetI ADL28312 Prudhoe Bay Oil Pool 12. Date Spudded 13. Date T.D. Reached 14. Date Comp., Susp. Or Aband. 115. Water Depth, if offshore 16. No. of Completions April 13, 1998 May 14, 1999 May 15, 1999I N/A feet MSL 1 17. Total Depth (MD + TVD) 18. Plug Back Depth (MD + TVD) 19. Directional Survey 120. Depth where SSSV set 21. Thick]~ess of Permafrost 10815' MD /8741' TVD 10773' MD /8741' 'I'VD YES r~] No [~I 2263' feet MD 1900' (approx) 22. Type Electric or Other Logs Run GR/CCL, MWD/GR 23. CASING, LINER AND CEMENTING RECORD SETTING DEPTH MD CASING SIZE WT. PER FT. GRADE TOP BOTTOM HOLE SIZE CEMENTING RECORD AMOUNT PULLED 20" 94# H-40 Surface 80' 32" 300 Sx PF 13-3/8" 72# L-80 Surface 2651' 17-1/2" 2615 Sx Fondu & 4O0 Sx AS II 9-5/8" 47# L-80 Surface 9266' 12-1/4" 500 Sx Class G 7" 29# L-80 8913' 9285' 8-1/2" 450 sx Class G 3-1/2"/3-3/16" 9.3# L-80 8893'/9254' 9254'/9988' 4-1/8" 30 bbls 15.8 ppg LARC 2-3/8" 4.6# L-80 9886.2' 10804' 2-3/4" uncemented pre-perforated liner 2 spf 24. Perforations open to Production (MD + TVD of Top and Bottom and 25. TUBING RECORD interval, size and number) SIZE DEPTH SET (MD) PACKER SET (MD) 5-1/2" 0032' 8836' 10266' - 10773' MD; 8752' - 8741' TVD; Pre-perforated Liner @2 SPF 4-1/2" 8960' 26. ACID, FRACTURE, CEMENT SQUEEZE, ETC. DEPTH INTERVAL (MD) AMOUNT & KIND OF MATERIAL USED (See Sidetrack Summary for details) 27. PRODUCTION TESTL Date First Production Method of Operation (Flowing, gas lift, etc.) May 19, 1999 gas lift Date of Test Hours Tested Production for OIL-BBL GAS-MCF WATER-BBL CHOKE SIZE I GAS-OIL RATIO 5/20/1999 3.0 Test Pedod >I 1591 Flow Tubing Casing Pressure Calculated OIL-BBL GAS-MCF WATER-BBL OIL GRAVITY - APl (corr) Press. 253 psi 24-Hour Rate > 143 228 2312 Brief description of lithology, porosity, fractures, apparent dips and pressence of oil, gas or water. Submit core chips. ?% ~¢~._~ · · This 10-407 is submitted as directed per the 10-401 form approved January22, 1998 (Permit#98-07) ~.; [,;i"i '- · This 10-407 is submitted as directed per the 10-403 form approved June 19, 1998 (Permit #398-155) ~.!¢1.~8. 0il & Gas C0~s. ...... Anchorage · This 10-407 is submitted as directed per the 10-403 form approved January 26, 1999 (Permit #399-028) Form 10-407 Rev. 7-1-80 CONTINUED ON REVERSE SIDE Submit in duplicate 29. NAME Top of Sag River Top of Shublik GEOLOGIC MARKERS MEAS. DEPTH 9279' 9310' TRUE VERT. DEPTH 8718' 8741' 30. FORMATION TESTS Include interval tested, pressure data, all fluids recovered and gravity. GOR, and time of each phase. 31. LIST OF A-I-rACHMENTS Summary of 14-18A CT Sidetrack Drilling Operations + Survey. 32. I hereby.,~ify that the following is tree and correct to the best of my knowledge. Signed .- Title AAI Coil Tubing Drilling Supervisor ~ Bruce E. Smith, P.E. .( INSTRUCTIONS Prepared by Paul Rauf 263-4990. General: This form is designed for submitting a complete and correct well completion report and log on all types of lands and leases in Alaska. Item 1: Classification of Service wells: Gas injection, water injection, steam injection, air injection, salt water disposal, water supply for injection, observation, injection for in-situ combustion. Item 5.' Indicate which elevation is used as reference (where not otherwise shown) for depth measurements given in other spaces on this form and in any attachments. Item 16 and 24: If this well is completed for separate production from more than one interval (multiple completion), so state in item 16, and in item 24 show the producing intervals for the interval reported in item 27. Submit a separate form for each additional interval to be separately produced, showing the data pertinent to such interval. Item 21-' Indicate whether from ground level (GL) or other elevation (DF, KB, etc.). Item 23.' Attached supplemental records for this well should show the details of any multiple stage cementing and the location of the cementing tool. Item 27: Method of Operation: Flowing, Gas Lift, Rod Pump, Hydraulic Pump, Submersible, Water Injection, Gas Injection, Shut-in, Other-explain. Item 28: If no cores taken, indicate "none". Form 10-407 14-18A · DESCRIPTION OF WORK COMPLETED .... COILED TUBING SIDETRACK DRILLING OPERATIONS SUMMARY Date Event Summary 4/12/1998: 4/13/1998: 4/14/1998: 4/16/1998: 4/1W1998: 4/2W1998: 4/21/1998: 4/22/1998: 4/23/1998: WOC. RIH w/BHA & tagged top of KOP @ 9224' MD. Milled pilot hole from 9224' to 9285' MD. POOH w/BHA. RIH w/ BHA & tagged bottom @ 9283' MD. Commenced window milling operation. Milled a window through the 7" casing from 9285' to 9288' MD. POOH w/BHA. RIH w/ formation mill BHA & reamed window from 9280' to 9298' MD. Displace well to flow-pro. Performed LOT to EMW 9.4 ppg. POOH w. BHA. RIH w/3-3/4 bi-centered bit & drilled from 9300' to 9310' MD. Drilled from 9310' to 9466' MD. POOH w/BHA. Noticed crack in CT. Changeout CT spool. Tested BOPE. CTU maintenance. RIH w/BHA & drilled to 9541' MD w/lost circulation. Pumped LCM pill. Squeezed to 950#. Drilled ahead to 9571' MD w/no returns. POOH w/BHA. RIH w/nozzle to 9300' MD. Squeezed a 32 bbls "Gunk" pill & attained 1300 psi max squeeze pressure. POOH. RIH w/BHA & drilled from 9607' to 9586' MD while loosing returns. PUH and pumped 2 LCM pills to combat lost circulation problems. Drilled ahead to 9705' MD. Drilled to 9722' MD & POOH w/BHA. RIH w/new BHA & experienced MWD problems. POOH. Changed out MWD & orienter. RIH & drilled to 9726' MD. Pumped a Bio pill. POOH to fix MWD problems. RIH w/BHA but CT plugged. POOH w/BHA and flushed coil. RIH & drilled ahead to 9737' MD. Total of 3 MWD failures. Drilled from 9737' to 9988' MD w/lost returns. @7800' MD pumped "Gunk" pill & squeezed to 1300 psi. RIH to bottom and cleaned out wellbore. PUH to 9200' MD and pumped LCM pill. Squeezed "Gunk" pill to 1800 psi. Tag bottom @ 9988' & POOH w/BHA. RIH w/3-1/2" Liner assembly & landed @ 9983' MD. Pumped 30 bbls of 15.8 ppg Latex Class G cement to set liner from 8898' to 9986' MD. PUH to 8000' MD & WOC. RDH & cleanout to TOL. Contaminated Cement w/ of Biozan & POOH. RIH w/milling BHA & washed through soft cement to 9954' MD. PT cement to 1500 psi, 100 psi leakoff in 5 minutes. Reamed up & down 9935' to 9983' MD. Milled to 9987' MD & CT became stuck in float shoe. Spotted 15 bbls of Crude. CT pulled free. Resumed milling of float shoe experiencing frequent bit stalls. POOH w/BHA. RIH w/milling BHA & milled remainder of liner float shoe. Milled 10' of OH to 9998' MD. POOH w/BHA. RIH to 9998' MD. Performed LOT to EMW 9.1 ppg. Drilled to 10027' MD. Drilled ahead to 10181' MD. Lost circulation & MWD failed. Drilled to 10187' MD and PUH to liner. Pumped LCM pill and squeezed to 1200 psi. POOH. Tested BOPE. RIH & drilled to 10197' MD. Sidetrack Summary Page I 14-18A DESCRIPTION OF WORK COMPLETED'~ .... · COILED TUBING SIDETRACK DRILLING OPERATIONS SUMMARY Date Event Summary 4/24/1998: 4/25/1998: 4/26/1998: 4/27/1998: 4/28/1998: 4/29/1998: 4/30/1998: 2/21/1999: 4/28/1999: 4/29/1999: 4/30/1999: 5/01/1999: 5/02/1999: 5/03/1999: 5/04/1999: 5/05/1999: 5/06/1999: Drilled forward to 10291' MD w/lost returns. Pumped LCM pill. POOH. RIH w/BHA to 9250' MD. Pumped 19 bbl "Gunk" pill and squeezed to 1100 psi. RIH to 10125' MD & started milling for OH sidetrack from 10125' to 10135' MD. Attempted to OH sidetrack @ 10135' MD. However, unable to ST due to lost circulation & broken Mud motor. Lost bit & motor shaft in OH. POOH. RIH w/BHA to 10095' MD. Work trough from 10095' to 10110' MD. Time drill hole sidetrack to 10113' MD' w/lost returns. Drill OH sidetrack from 10110' to 10137' MD. POOH. RIH w/Bicentered bit to 7520' MD & discovered pinhole leak in CT. POOH & changeout CT spool. RIH w/BHA & drilled from 10135' to 10178' MD. Pumped 10 bbl LCM pill. POOH due to MWD failure. Experienced total of 3 MWD failures. RIH & tagged bottom at 10178' MD. Experienced orienter failure. POOH. Experienced MWD and orienter problems. RIH w/BHA & drilled forward from 10178' MD to 10218' MD w/lost returns. Drill ahead to 10232' MD w/weak MWD signal. POOH. RIH w/BHA & drilled to 10260' MD (TD). MWD failure. POOH. RD & MOL. The plan is to return in the future & complete the well. Left 275' of active OH + 196' of rat hole in inactive hole). Placed the well on initial production w/gas lift & obtained a valid well test. Pumped lost circulation pill in OH (Sodium Silicate treatment 80 bbls) MIRU CTU. Cont. MIRU. PT'd BOPE. RIH w/cleanout assembly & tagged obstruction @ 9270'. Bled gas off 9-5/8" casing. Attempted to get circulation - no returns. Performed FCO to 10162' MD. POOH. RIH & logged f/9280'- 10146'. Began OH sidetrack @ 10065'. Drilled to 10227' & POOH. RIH & drilled to 10433'. PUH & CT stuck @ 10130'. Disconnected f/fish & POOH. RIH w/fishing tools & attempted to retrieve fish (bit, motor, mwd, orienter, bleed sub, & circ sub). Latched fish @ 10094' but unable to free it. POOH w/fishing tools. RIH & tagged fish @ 10070'. Troughed f/10000' - 10063' MD for OH ST. PUH to 9980 & backreamed to 10030'. POOH. RIH & tagged BTM @ 10065'. Drilled to 10121' & POOH. RIH & drilled to 10145' MD. Sidetrack Summary Page 2 14-18A ' DESCRIPTION OF WORK COMPLETED''~ ~ COILED TUBING SIDETRACK DRILLING OPERATIONS SUMMARY Date Event Summary 5/07/1999: 5/08/1999: 5/09/1999: 5/10/1999: 5/11/1999: 5/12/1999: 5/13/1999: 5/14/1999: 5/15/1999: Drilled to 10172 & POOH. PT'd BOPE. RIH w/bi-centered bit & drilled to 10325'. POOH. RIH w/core sample barrel & cored to 10330'. POOH w/7" of core. Core confirmed Sag. RIH & drilled to 10430'. POOH. RIH & drilled to 10467'. Drilled ahead to 10607' & POOH. RIH & drilled to 10638' MD. Drilled to 10775' & POOH. RIH w/BHA to BTM. Drilled to 10799' & short trip to liner shoe. CT stuck @ 10186'. Freed CT & POOH. RIH for another OH sidetrack. Troughed f/10695' - 10725'. Drilled to 10736'. Drilled ST to 10761' & POOH. RIH & drilled to 10778'. Unable to go further so POOH. Motor parted leaving fish in hole. RIH w/fishing tools & tagged fish @ 10768'. Latched fish & POOH. No recovery. RIH w/fishing tools & recovered fish. PT'd BOPE. RIH w/BHA. Drilled to 10798' & POOH. RIH & drilled to 10813'. POOH. RIH & drilled toTD @ 10815'. Unable to drill past 10809'. POOH w/BHA. Left rotor, bearing section, transmission, & bit in hole as fish. RIH w/2-3/8" liner & landed it @ 10804'. TOL - 9886'. Pre-perforated liner area is f/: 10266' - 10773' MD (Sag Zone) POOH w/CT. Pumped Crude. RDMOL. Placed the well on initial production & obtained a valid well test. Sidetrack Summary Page 3 Anadrill 1111 East 80th Avenue Anchorage, Alaska 99518-3304 (907) 349-4511 (907) 349-2487 (fax) April 29, 1998 Central Files Arco Alaska Inc. Anchorage, Alaska Enclosed is a copy of the survey program, and performance letter for 14-1Sa, and 14-18a st. Please let me know if you have any questions regarding this data. Craig Brown or myself can be reached at (907)-349- 4511. Sincerely, Mark Brown Cell Manager, Anadrill Arco Coil Tubing Criag Brown Field Service Manager ~ [11Tfl ,~=-h[_. Iq Anadrill Date: Well Name: Company: A.P.I. Number: Location: Field: Rig: 29-April-9~8, 14-18a ARCO Alaska Inct _ t 50-029-20551-.0'I" "70 North Slope Alaska Prudhoe Bay Nabors 3-S Anadrill Personnel: Cell Manager: Field Crew: Field Support: Alaska District Manager: Field Service Manager: Mark Brown Don Webb Martin Varco Craig Brown SERVICES PROVIDED Service Directional Survey Services (DSS) Gamma Ray (GR) Service Dates 22-Apr-98 23-Apr-98 22-Apr-98 23-Apr-98 Depth Interval 9988' 10291' 9963' 10266' OPERATING STATISTICS Total MWD Pumping Hours: Total MWD Below rotary Hours: Total MWD Footage: Total MWD Runs: JOB PERFORMANCE 27.5 37.5 303' 2 DIRECTIONAL Survey (DSS) were provided over the entire well. Continuous inclination was provided, which proved to be a major advantage in determining if we were building or dropping angel before we got to a survey point. Survey on the fly was used through out the well, thereby reducing the risk of getting stuck. FORMATION EVALUATION Realtime GR values were provided in order to identify formation lithology. In doing so we were possible to geosteer the sands and shales. ~,-~nqliil,~oj~ ~ Anadrill LESSONS LEARNED Survey quality based on direction we were drilling, again was a problem on this well as in the past. We will be using a survey program called MAGCOR,(which after 4 surveys have been taken at the same depth, in 4 different tool faces, 0, 90, 180, 270.) Which will determine what axis is most effected, and apply a correction to compensate for that interference. Anadrill appreciated the opportunity to provide ARCO Alaska Inc. with MWD SHARP and (GR) services on 14-18a. Sincerely, Mark Brown Cell Manager, Anadrill / ARCO Coil Tubing Craig Brown Field Service Manager ClSe~t ................... : Arco Alaska Znc. F:Leld .................... : Pruc[hoe Bay APZ number ............... : 50-029-20551-,9'~_ F, ng~neex ................. : Il. BLown ~ STATE: ................... : Alaska Survey calculation methods Method for positions ..... : Mlnlmumcu=vature Method for DLS ........... : Mason & Taylor Depth reference Permanent datum .......... : MSL Depth reference .......... : RKB GL above l~-_=manent ....... : 34.00 ft KB above permanent ....... : 57.00 ft DF above permanent ....... : 58.00 ft ..... Vertlcal sectlon orlgln Latitude (+N/S-) ......... : 139.41 ft Departure (+E/W-) ........ : -2730.04 ft Platform referencepoint. LatzLtude (+N/S-) ......... : 70.238137 Departure (+E/W-) ........ : -148.589275 Azlmuth from rotary table to target: 265.80 degrees · _~_ =_=ured Inal Azimuth Course TVD Vertical depth angle angle length tie, th se~tlon (ft) (d~g) (deg) (ft) (ft) (ft) 10087.84 96.25 251.5 0.00 8687.92 2712.50 2 10127.10 98.98 246.6 39.30 8682.71 2749.78 3 10179.80 99.85 240.7 52.70 8674.08 2797.92 4 10208.10 98.94 234.0 28.30 8669.46 2822.45 5 10236.50 96.12 232.4 28.40 8665.73 2846.16 26-Apr-98 18:40:54 Spud date ................ : 21-A~r-98 ~t ~ date ......... : 26-A~r-98 Tota/ aec_m~=t_g~_surveys...: 6 MD of first surv~ ....... : 10087.84 ft MD of last s~rvey ........ : 10291.00 ft ..... Geomagneti. a data Magnetic model ........... : BGGMversion 1997 Magnet. lc date ............ : 19-May-1998 Magnetic field stre/lgth..: 1146.59 HCNT Magnet. to dea (+E/W-) ..... : 28.21 degrees Magnet1= d.~.p ............. : 80.69 ~ ..... MRD survey ReferenceCrlterla Reference G .............. : 1002.70 mGal Refe_renceH .............. : 1147.00 HCNT Reference Dlp ............ : 80.69 degrees Tolerance of G ........... : (+/-) 3.00 mGal Tolerance of H ........... : (+/-) 7.00 HCNT Tolerance of Dlp ......... : (+/-) 0.30 degrees Magnetlc d~a (+g/W-) ..... : 28.21 d~zrees Grid convergence (+E/W-).: 0.00 degrees Total az corr (+E/W-) .... : 28.21 degrees (Totml az corr =magnetic dec - grid cony) Sag applied (Y/N) ........ : No d~gree: 0.00 DtspZ Dlspl Total At DLS +N/S- +E/W- displ Azlm (deg/ (ft) (ft) (ft) (cLeo3') 100f) 139.41 -2730.04 2733.60 272.92 0.00 125.49 -2766.41 2769.25 272.60 14.18 102.43 -2812.97 2814.84 272.09 11.17 87.38 -2836.47 2837.81 271.76 23.58 70.51 -2859.01 2859.88 271.41 11.39 TIP MRDH MRDM M~DM 6 10291.00 90.70 229.3 54.50 8662.49 2890.73 36.18 -2901.17 2901.40 270.71 11.45 MRD M ARCO Alaska, Inc. Structure : D.S. 14 Field : Prudhoe Boy Well : 14-18A, 50-029-20551-01 Location : North Slope, Alaska West (feet) Created by patna= Oa[e plotted : 1-Jun-IgC9 Plat Reference is 14-1 SA. Coordinate', ore ~n feet reterence 14-18. True Vertical Depths ore reference rkb - MSL = 71ft. --- Baker Hughe~ INTEQ --- 4700 4600 4500 4400 4300 4200 4100 4000 3900 3800 3700 3600 3500 3400 3300 3200 3100 3000 2900 2800 2700 2600 I [ .. I I I I I I I I I I I I J .. ) t _t__ _[. [ [ I ! . I [ J .. .! I I .. tI I I I I I I I I I I t I 8300 --i-- ,+_. B400 8500 8600 g700 8800 I V 89oo Projected to TO 0 R Ifil NA L RECEIVED I I I "1 I t f --S 'l 'l I .... I I ( I '"'1 '" I I '"1 .... I I" '1 I I II "1 ..... I I ' 't 1 t '~ '1 I [' I' I I I "'l ' '1 I 2600 2700 2800 2900 5000 ' 3100 3200 3500 3400 3500 5600 3700 3800 3900 4000 4100 4200 4500 6400 4500 4600 4'/00 Vertical Section /feet} -> Azimuth 264.00 with reference 0.00.N, 0.00 E from 14-18 400 300 200 100 O~' 100 ~ 200 300 400 ARCO Alaska, Inc. D.S. 14 14-18A Plugback ~3 14-18 Prudhoe Bay North Slope, Alaska SURVEY LISTING by Baker Hughes INTEQ Your ref : 14-18A Plugback~3 Our ref : svyl51 License : 50-029-20551-72 Date printed : 1-Jun-1999 Date created : 1-Ju_n-1999 Last revised : 1-Jun-1999 Field is centred on 708179.340,5930615.440,999.00000,N Structure is centred on 676440.114,5940368.937,999.00000,N Slot location is n70 14 17.308,w148 35 21.405 Slot Grid coordinates are N 5938670.950, E 674698.660 Slot local coordinates are 1656.87 S 1780.84 W Projection type: alaska - Zone 4, Spheroid: Clarke - 1866 Reference North is True North ARCO Alaska, Inc. D.S. 14,14-18A Plugback ~3 Prudhoe Bay,North Slope, Alaska Measured Inclin Azimuth Subsea R E C T A N G Depth Degrees Degrees Depth C 0 0 R D I N SURVEY LISTING Page 1 Your ref : 14-18A Plugback#3 Last revised : 1-Jun-1999 U L A R Dogleg Vert G R I D C O 0 R D S A T E S Deg/100ft Sect Easting Northing. 9948.57 88.80 256.40 8696.18 179.27N 2592.37W 10.67 2559.43 672102.97 5938789.49 10065.00 95.03 252.31 8692.29 147.92N 2704.35W 6.40 2674.07 671991.77 5938755.52 10111.00 93.80 266.10 8688.73 139.36N 2749.29W 30.01 2719.66 671947.04 5938745.91 10142.00 96.40 288.00 8685.94 143.11N 2779.74W 70.85 2749.55 671916.51 5938748.95 , 10174.00 89.00 278.80 8684.43 150.50N 2810.78W 36.86 2779.65 671885.31 5938755.61 10207.00 90.70 269.00 8684.52 152.74N 2843.66W 30.14 2812.12 671852.38 5938757.08 10239.00 96.60 254.70 8682.47 148.24N 2875.18W 48.24 2843.94 671820.98 5938751.84 10269.00 96.90 251.40 8678.95 139.55N 2903.68W 10.97 2873.18 671792.70 5938742.49 10303.00 98.70 247.90 8674.33 127.84N 2935.25W 11.49 2905.81 671761.41 5938730.05 10335.00 96.30 244.00 8670.15 114.92N 2964.22W 14.22 2935.97 671732.76 5938716.45 10372.00 94.50 241.20 8666.67 97.96N 2996.91W 8.97 2970.26 671700.47 5938698.74 10405.00 94.90 238.70 8663.97 81.50N 3025.38W 7.65 3000.29 671672.40 5938681.61 10433.00 96.00 236.40 8661.31 66.54N 3048.90W 9.07 3025.24 671649.23 5938666.11 Ail data in feet unless otherwise stated. Calculation uses minimum curvature method. Coordinates from 14-18 and TVDss from rkb - MSL = 71ft. Bottom hole distance is 3049.63 on azimuth 271.25 degrees from wellhead. Vertical section is from wellhead on azimuth 264.00 degrees. Grid is alaska - Zone 4. Grid coordinates in FEET and computed using the Clarke - 1866 spheroid Presented by Baker Hughes INTEQ ARCO Alaska, Inc. D.S. 14,14-18A Plugback ~3 Prudhoe Bay,North Slope, Alaska SURVEY LISTING Page 2 Your ref : 14-18A Plugback~3 Last revised : 1-Jun-1999 Comments in wellpath MD TVDss Rectangular Coords. Comment 9948.57 8696.18 179.27N 2592.37W Tie on 10433.00 8661.31 66.54N ,3048.90W Projected to TD · NO Targets associated with this wellpath ARCO Alaska, Inc. D.S. 14 14-18A Plugback ~4 14-18 Prudhoe Bay North Slope, Alaska SURVEY LISTING by Baker Hughes INTEQ ORIGINAL Your ref : 14-18A Plugback#4 Our ref : svy152 License : 50-029-20551-73 RECEIVED Date printed : 1-Jun-1999 ,~1 IN 04 1999 Date created : 1-Jun-1999 Last revised : 1-Jun- 1999 ~aS~,~ 0ii & G-~S C0~s, C0m~J~$i0J~ E±eld is centred on ?08179.340,5930615.440,999.00000,~ Structure is centred on 676440. 114,5940368. 937,999. 00000 ,N Slot location is n70 14 17.308,w148 35 21.405 Slot Grid coordinates are N 5938670.950, E 674698.660 Slot local coordinates are 1656.87 S 1780.84 W Projection type: alaska - Zone 4, Spheroid: Clarke - 1866 Reference North is True North ARCO Alaska, !nc. D.S. 14,14-18A Plugback #4 Prudhoe Bay, North Slope, Alaska SURVEY LISTING Page 1 Your ref : 14-18A Plugback~4 Last revised : 1-Jun-1999 Measured Inclin Azimuth Subsea Depth Degrees Degrees Depth R E C T A N G U L A R Dogleg Vert G R I D C O 0 R D S C 0 0 R D I N A T E S Deg/100ft Sect Easting Northing. 9948.57 88.80 256.40 8696.18 179.27N 2592.37W 10.67 2559.43 672102.97 5938789.49 10024.00 92.84 253.75 8695.10 159.85N 2665.23W 6.40 2633.92 672030.60 5938768.37 10045.00 92.50 250.50 8694.12 153.41N 2685.19W 15.54 2654.44 672010.79 5938761.47 10088.00 85.60 251.40 8694.84 ,139.39N 2725.80W 16.18 2696.30 671970.52 5938746.49 10121.00 89.20 247.70 8696.33 127.87N 2756.68W 15.63 2728.21 671939.92 5938734.26 10157.00 96.10 246.30 8694.67 113.83N 2789.76W 19.56 2762.58 671907.18 5938719.45 10194.00 96.20 242.90 8690.70 98.06N 2822.99W 9.14 2797.27 671874.33 5938702.90 10227.00 98.50 239.80 8686.48 82.37N 2851.70W 11.63 2827.47 671845.99 5938686.55 10253.00 98.20 236.70 8682.71 68.83N 2873.58W 11.85 2850.64 671824.45 5938672.50 10284.00 98.20 234.30 8678.28 51.46N 2898.86W 7.66 2877.60 671799.58 5938654.54 10314.00 93.80 233.10 8675.15 33.80N 2922.90W 15.20 2903.35 671775.96 5938636.32 10346.00 89.40 235.70 8674.25 15.18N 2948.90W 15.97 2931.16 671750.40 5938617'.11 10377.00 89.30 234.30 8674.61 2.60S 2974.29W 4.53 2958.27 671725.44 5938598.74 10411.00 88.80 230.40 8675.17 23.36S 3001.20W 11.56 2987.20 671699.02 5938577.36 10437.00 88.90 227.10 8675.69 40.49S 3020.74W 12.70 3008.43 671679.89 5938559.77 10471.00 91.10 227.40 8675.69 63.57S 3045.71W 6.53 3035.67 671655.47 5938536.11 10503.00 92.10 230.50 8674.80 84.58S 3069.83W 10.18 3061.85 671631.85 5938514.55 10539.00 91.30 235.90 8673.73 106.12S 3098.63W 15.16 3092.75 671603.56 5938492.34 10570.00 93.20 238.10 8672.51 122.99S 3124.61W 9.37 3120.35 671577.99 5938474.87 10602.00 90.00 240.40 8671.62 139.34S 3152.09W 12.31 3149.39 671550.90 5938457.88 10634.00 87.70 241.30 8672.26 154.93S 3180.03W 7.72 3178.81 671523.33 5938441.65 10667.00 89.50 242.90 8673.07 170.36S 3209.19W 7.30 3209.41 671494.55 5938425.53 10700.00 91.70 248.00 8672.72 184.07S 3239.19W 16.83 3240.68 671464.88 5938411.13 10738.00 93.90 252.20 8670.87 196.98S 3274.87W 12.46 3277.52 671429.51 5938397.38 10770.00 93.20 253.00 8668.88 206.53S 3305.34W 3.32 3308.82 671399.27 5938387.12 10799.00 94.70 254.50 8666.89 214.63S 3333.12W 7.31 3337.29 671371.70 5938378.38 Ail data in feet unless otherwise stated. Calculation uses minimum curvature method. Coordinates from 14-18 and TVDss from rkb - MSL = 71ft. Bottom hole distance is 3340.02 on azimuth 266.32 degrees from wellhead. Vertical section is from wellhead on azimuth 264.00 degrees. Grid is alaska - Zone 4. Grid coordinates in FEET and computed using the Clarke - 1866 spheroid Presented by Baker Hughes INTEQ ARCO Alaska, Inc. D.S. 14,14-18A Plugback ~4 Prudhoe Bay,North Slope, Alaska SURVEY LISTING Page 2 Your ref : 14-18A Plugback~4 Last revised : 1-Jun-1999 Comments in wellpath MD TVDss Rectangular Coords. Comment 9948.57 8696.18 179.27N 2592.37W Tie on 10799.00 8666.89 214.63S ,3333.12W Projected to TD NO Targets associated with this wellpath ARCO Alaska, Inc. D.S. 14 14-18A 14-18 Prudhoe Bay North Slope, Alaska SURVEY LISTING by Baker Hughes INTEQ Your ref : 14-18A Our ref : svy153 License : 50-029-20551-01 Date printed : 1-Jun-1999 Date created : 1-Jun-1999 Last revised : 1-Jun-1999 ORIGINAL RECEIVED , It ,~1 0 4 1999 Al~f~ Oil & C~s C~s, Cmmmi~io~ Field is centred on 708179.340,5930615.440,999.00000,N Structure is centred on 676440.114,5940368.937,999.00000,N Slot location is nT0 14 17.308,w148 35 21.405 Slot Grid coordinates are N 5938670.950, E 674698.660 Slot local coordinates are 1656.87 S 1780.84 W Projection type: alaska - Zone 4, Spheroid: Clarke - 1866 Reference North is True North ARCO Alaska, Inc. DoS. 14,14-18A Prudhoe Bay,North Slope, Alaska SURVEY LISTING Page 1 Your ref : 14-18A Last revised : 1-Jun-1999 Measured Inclin Azimuth Subsea R E C T A N G U L A R Do§leg Vert G R I D C O O R D S Depth Degrees Degrees Depth C 0 0 R D I N A T E S Deg/100ft Sect Easting Northing. 9948.57 88.80 256.40 8696.18 179.27N 2592.37W 10.67 2559.43 672102.97 5938789.49 10024.00 92.84 253.75 8695.10 159.85N 2665.23W 6.40 2633.92 672030.60 5938768.37 10045.00 92.50 250.50 8694.12 153.41N 2685.19W 15.54 2654.44 672010.79 5938761.47 10088.00 85.60 251.40 8694.84 ~ ,139.39N 2725.80W 16.18 2696.30 671970.52 5938746.49 10121.00 89.20 247.70 8696.33 127.87N 2756.68W 15.63 2728.21 671939.92 5938734.26 10157.00 96.10 246.30 8694.67 10194.00 96.20 242.90 8690.70 10227.00 98.50 239.80 8686.48 10253.00 98.20 236.70 8682.71 10284.00 98.20 234.30 8678.28 113.83N 2789.76W 19.56 2762.58 671907.18 5938719.45 98.06N 2822.99W 9.14 2797.27 671874.33 5938702.90 82.37N 2851.70W 11.63 2827.47 671845.99 5938686.55 68.83N 2873.58W 11.85 2850.64 671824.45 5938672.50 51.46N 2898.86W 7.66 2877.60 671799.58 5938654.54 10314.00 93.80 233.10 8675.15 10346.00 89.40 235.70 8674.25 10377.00 89.30 234.30 8674.61 10411.00 88.80 230.40 8675.17 10437.00 88.90 227.10 8675.69 33.80N 2922.90W 15.20 2903.35 671775.96 5938636.32 15.18N 2948.90W 15.97 2931.16 671750.40 5938617~11 2.60S 2974.29W 4.53 2958.27 671725.44 5938598.74 23.36S 3001.20W 11.56 2987.20 671699.02 5938577.36 40.49S 3020.74W 12.70 3008.43 671679.89 5938559.77 10471.00 91.10 227.40 8675.69 10503.00 92.10 230.50 8674.80 10539.00 91.30 235.90 8673.73 10570.00 93.20 238.10 8672.51 10602.00 90.00 240.40 8671.62 63.57S 3045.71W 6.53 3035.67 671655.47 5938536.11 84.58S 3069.83W 10.18 3061.85 671631.85 5938514.55 106.12S 3098.63W 15.16 3092.75 671603.56 5938492.34 122.99S 3124.61W 9.37 3120.35 671577.99 5938474.87 139.34S 3152.09W 12.31 3149.39 671550.90 5938457.88 10634.00 87.70 241.30 8672.26 10667.00 89.50 242.90 8673.07 10700.00 91.70 248.00 8672.72 10729.00 93.70 251.10 8671.36 10760.00 90.20 246.40 8670.30 154.93S 3180.03W 7.72 3178.81 671523.33 5938441.65 170.36S 3209.19W 7.30 3209.41 671494.55 5938425.53 184.07S 3239.19W 16.83 3240.68 671464.88 5938411.13 194.19S 3266.33W 12.71 3268.73 671437.98 5938400.38 205.41S 3295.19W 18.89 3298.61 671409.39 5938388.48 10782.00 90.50 251.10 8670.17 10813.00 88.90 252.30 8670.33 213.38S 3315.69W 21.41 3319.83 671389.09 5938380.03 223.12S 3345.12W 6.45 3350.11 671359.90 5938369.~1 All data in feet unless otherwise stated. Calculation uses minimum curvature method. Coordinates from 14-18 and TVDss from rkb - MSL = 71ft. Bottom hole distance is 3352.55 on azimuth 266.18 degrees from wellhead. Vertical section is from wellhead on azimuth 264.00 degrees. Grid is alaska - Zone 4. Grid coordinates in FEET and computed using the Clarke - 1866 spheroid Presented by Baker Hughes INTEQ ~CO Alaska, Inc. D.S. 14,14-18A Prudhoe Bay,North Slope, Alaska SURVEY LISTING Page 2 Your ref : 14-18A Last revised : 1-Jun-1999 MD TlrDss 9948.57 8696.18 10813.00 8670.33 Comments in wellpath Rectangular Coords. Comment 179.27N 2592o37W Tie on 223.12S ,3345.12W Projected to TD NO Targets associated with this wellpath Prudhoe Bay Unit Alaska State Plane Zone 4 PBU EOA DS 14 14-18A ORIGINAL SURVEY REPORT 3 June, 1998 Your Reft API-500292055101 Last Survey 18-April-98 Job# AKMW80188 KBE- 7~.00' Surface Coordinates: 5938669.26 N, 674699.2~ E (70° 14' 17.2909"N, 2~1° 24'38.6100"E) Sl::m~r~j-sum DRILLING C;ERVICEC~ · . DII/'L~ION OF Da£R IN~3U~l'~lr~ RECEIVED ~UN 2 ? 1998 AJa~ka 0il & Gas Co~s. Commi~on Anchorage Survey Ref: svy3428 Prudhoe Bay Unit Measured Depth (ft) Sub-Sea Depth (ft) Vertical Depth (ft) 9200.00 34.500 291.744 8582.47 8653.47 9255.00 35.310 293.000 8627.58 8698.58 9285.00 38.410 285.400 8651.59 8722.59 9288.00 39.930 284.800 8653.92 8724,92 9307.49 48.260 281.500 8667.90 8738.90 9339.49 57.130 277.300 8687.28 8758.28 9367.34 65.210 274.390 8700.71 8771.71 9396.59 73.390 268.690 8711.04 8782.04 9429.54 83.230 264.470 8717.71 8788.71 9467.84 95.620 260.080 8718.10 8789.10 9497.34 97.820 258.140 8714.65 8785.65 9526.07 97.900 256.180 8710.72 8781.72 9563.54 95.890 253.920 8706.22 8777.22 9591.99 94.480 257.440 8703.65 8774.65 9621.22 92.370 258.840 8701.90 8772.90 9652.69 89.120 255.500 8701.49 8772.49 9680.27 89.740 254.100 8701.76 8772.76 9711.39 90.530 250.580 8701.69 8772.69 9762.22 90.790 251.990 8701.11 8772.11 9798.42 92.370 254.450 8700.11 8771.11 9837.29 92.640 250.800 8698.41 8769.41 9879.37 92,550 251.800 8696.50 8767.50 9908.02 90.180 252.300 8695.82 8766.82 9948.57 88.800 256.400 8696.18 8767.18 Sperry-Sun Drilling Services Survey Report for 14-18A Your Ref: API-500292055101 Local Coordinates Global Coordinates Dogleg Vertical Northings Eastings Northings Eastings Rate Section (ft) (ft) (ft) (ft) (°/100ft) (ft) 287.54 N 1923.25W 5938912.16 N 672769.82 E 1938.51 299.52 N 1952.35W 5938923.46 N 672740,45 E 1.969 1968.37 305.39 N 1969.32W 5938928.94 N 672723.34 E 18.361 1985.71 305.88 N 1971.15W 5938929.39 N 672721.50 E 52.217 1987.57 308.93 N 1984.35W 5938932.13 N 672708.23 E 44.322 2000.95 313.03 N 2009.44W 5938935.65 N 672683.06 E 29.609 2026.25 315.49 N 2033.69W 5938937.54 N 672658.76 E 30.418 2050.62 316.19 N 2061.00W 5938937.61 N 672631.43 E 33.370 2077.91 314.24 N 2093,16W 5938934.92 N 672599.33 E 32.383 2109.86 309.11 N 2131.03W 5938928.91 N 672561.59 E 34.313 2147.29 303.57 N 2159.80W 5938922.71N 672532.96 E 9.913 2175.60 297.25 N 2187.54W 5938915.74 N 672505.36 E 6.764 2202.85 287.65 N 2223.48W 5938905.32 N 672469.66 E 8.039 2238.03 280.65 N 2250.93W 5938897.68 N 672442.38 E 13,281 2264.93 274.65 N 2279.48W 5938891.02 N 672413.98 E 8.658 2293.00 267.66 N 2310.15W 5938883.33 N 672383.47 E 14.807 2323.12 260.43 N 2336.77W 5938875.48 N 672357.03 E 5.551 2349.17 250.99 N 2366.42W 5938865.36 N 672327.61 E 11.592 2378.10 234.69 N 2414.55W 5938847.94 N 672279.87 E 2.821 2424.99 224.24 N 2449.19W 5938836.69 N 672245.48 E 8.074 2458.83 212.65 N 2486.25W 5938824.24 N 672208.70 E 9.407 2495.00 199.17 N 2526.07W 5938809.85 N 672169.21 E 2.384 2533.79 190.34 N 2553.31W 5938800.39 N 672142.17 E 8.454 2560.36 179.41 N 2592.35W 5938788.55 N 672103.40 E 10.668 2598.55 Comment Tie-on Survey Window point Last Survey Station Alaska State Plane Zone 4 PBU EOA DS 14 Continued... 3 June, 1998 - 8:37 - 2. DrillQuest Prudhoe Bay Unit Sperry-Sun Drilling Services Survey Report for 14-18A Your Ref: API-500292055101 Alaska State Plane Zone 4 PBU EOA DS 14 All data is in feet unless otherwise stated. Directions and coordinates are relative to True North. Vertical depths are relative to Well Reference. Northings and Eastings are relative to Well Reference. The Dogleg Severity is in Degrees per 100ft. Vertical Section is from Well Reference and calculated along an Azimuth of 273.959° (True). Based upon Minimum Curvature type calculations, at a Measured Depth of 9948.57ft., The Bottom Hole Displacement is 2598.55ft., in the Direction of 273.959° (True). Comments Measured Station Coordinates Depth TVD Northings Eastings Comment (ft) (ft) (ft) (ft) 9200.00 8653.47 287.54 N 1923.25 W Tie-on Survey 9285.00 8722.59 305.39 N 1969.32 W Window point 9948.57 8767.18 179.41 N 2592.35 W Last Survey Station 3 June, 1998 - 8:37 - 3 - DrillQuest TONY KNOWLE$, GOVERNOR ~kL&SKA OIL AND GAS CONSERVATION COMMISSION 3001 PORCUPINE DRIVE ANCHORAGE, ALASKA 99501-3192 PHONE: (907) 279-1433 FAX: (907) 276-7542 Januav,' 22. 1998 Erin M. Oba Engineering Supervisor ARCO Alaska. Inc. P O Box 100360 Anchorage, AK 99510-0360 Re~ Prudhoe Bay Unit 14-18A ARCO Alaska. Inc. Permit No. 98-07 Sur. Loc. 1659'S & 1783'W of NE cr Sec 9. TION. R14E. UM Btmnhole Loc. 1676'FNL. 1073'FEL, Sec. 8. T10N. R14E. UM Dear Ms. Oba: Enclosed is the approved application for permit to rcdrill thc above referenced well. The permit to rcdrill does not exempt you from obtaining additional permits required by law from other governmental agencies, and docs not authorize conducting drilling operations until all other required permitting determinations are made. Blowout prevention equipment (BOPE) must be tested in accordance with 20 AAC 25 035. Sufficient notice (approximately 24 hours) must be given to allow a representative of the Commission to witness a test of BOPE installed prior to drilling new hole. Notice may be given inspector on thc North Slope pager at 659-3607. --.~-.-____~ _ BY ORDER OF THE COMMISSION dlffEnclosurcs CC; Department of Fish & Game. Habitat Section w/o cncl. Department of Environmental Conservation w/o cncl. STATE OF ALASKA AE^SKA OIL AND GAS CONSERVATION C~'rv~MISSION PERMIT TO DRILL 20 AAC 25.005 la. Type of Work Ddll _ Redrill ~ lb. Type of Well Exploratory_ Stratigraphic Test _ Development Oil Re-Entry__ Deepen _ Service_ Development Gas_ Single Zone :X Multiple Zone_ 2. Name of Operator 5.Datum Elevation (DF or KB) 10. Field and Pool ARCO Alaska, Inc. RKB 58' 3. Address 6. Property Designation P.O. Box 100360 Prudhoe Bay Field Anchorage, AK 99510-0360 ADL 28312 Prudhoe Bay Oil Pool 4. Location of well at surface 7. Unit or property Name 11. Type Bond (see 20 AAC 25.025) 1659' S & 1783' W of NE cr Sec 9, T10N, R14E, UM. Prudhoe Bay Unit Statewide At top of productive interval 8. Well number Number 1309' S & 1466' E of NW cr, Sec 9, T10N, R14E, UM 14~18A #U-630610 At total depth 9. Approximate spud date Amount (Proposed) 1676' FNL, 1073' FEL, Sec 8, T10N, R14E, UM. March, 1998 $200,000 12. Distance to nearest I 13. Distance to nearest well 14. Number of acres in property 15. Proposed depth (MD and TVD) property line No Close Approach 12060' MD / 8753' TVD 16. To be completed for deviated we,s 17. An,o pated pressure (see 20,*O 25.03S(e)(2)) kickoff depth N/A Maximum hole angle 90° Maximum surface 2800 psig Attotal depth (TVD) 880(7 18. Casing program Setting Depth Size Specification Top Bottom Quantity of cement Hole Casing Weight Grade Coupling Length MD TVD MD TVD (include stage data) 3-3/4" 2-7/8" 6.4 L-80 FL4S 3100' 8900' 8405' 12060' 8753' N/A (slotted liner) 19. To be completed for Redrill. Re-entry. and Deepen Operations. / Present well condition summary Totaldepth: measured 10250 feet Plugs(measured) ~. J~¢'¢ ~ ~" true vertical 9514 feet A/aska . Oil Effective depth: measured 10215 feet Junk (measure'd)/~ ~.C0j~S. & true vertical 9484 feet ,~nc,orage Casing Length Size Cemented Mea.~ured depth True Vertical depth Conductor 80' 20" 300 Sx PF 80' 80' Surface 2580' 13-3/8" 2615 Sx Fondu & 400 Sx AS II 2651' 2651' Production 9195' 9-5/8" 500 Sx Class G 9266' 8704' Liner 1337" 7" 450 Sx Class G 10250' 9514' Pedoration depth: measured 9282 - 9300'; 9323 ~ 9343'; 9400 - 9430'; 9440 - 9470' true vertical 8720- 8735'; 8754- 8770'; 8814- 8838'; 8846- 8870'ORI61NAL 20. Attachments Filing fee X Property plat _ BOP Sketch __x Diverter Sketch _ Ddllin~ program X Drilling fluid program Time vs depth plot_ Refraction analysis _ Seabed report _ 20 ~C 25.050 requirements_ 21. I hereby certity that the foregoing is true and correct to the boot of my knowledge Signed ~::>.~ '~J. ~ Titlle Engineeri,g Supervisor Date //"'- ,/~ "' 743¢ Commission Use On~ Permit N~_~:,?.r_ o .~IAP' number- o,I Approval date i f~L~;:)~?' [ otherSee coverletter fOrrequirements Conditions of approval Samples required _Yes ~No Mud log required Yes _/~No Hydrogen sulfide measures '~'_ Yes _ No Directional survey required .~Yes _ No Required working pressure for BOPE _ 2M; _ 3M; _ 5M; _ 10M; _ 15M X 3500 psi for CTU Other: Signed By Approved by Commissioner the commission Date Form 10-401 Rev. 7-24-89 iiin triplicate DS 14-18A CT Sidetrack and Completion Intended Procedure Objective: Set whipstock. Plugback existing wellbore. Directionally drill a horizontal well from the existing wellbore. Complete with 2-7/8" slotted liner. Run tubing patch across GLM #5. Intended Procedure: Set top of whipstock @ - 9280'. Cement squeeze the current perforations and leave cement @ ~ 929q md. Mill window in 7" casing at ~9285' md. Drill 10' of formation and perform Leak off test to 9.4 ppg, 0.5 ppg above the highest anticipated mud weight (8.9 ppg FloPro). · Directionally drill 3-3/4" x -20D0' horizontal well to access Sag reserves. · Run 2-7/8" slotted liner to TD. · Run tubing patch across GLM #5 and return well to production. January 5, 1998 Tree Vertical Depth [400fL/in] South(-)/North(+) [500ft/in] o o- 0 I ' I Company: Nodh Slope, Alaska Field: All North Slope Fields Site: Drill Site 014-18 Well: DS 14-18 Wellpath; DS 14-18 OH ASP Date: 9/24/97 Time: 09:18:05 Co-ordinate(NE) Reference: Wellhead: DS 14-18, Grid North Vertical (TVD) Reference: F'~d: Mean Sea Level Section (VS) Reference: Plan: P~e: Field: All North Slope Fields Alaska Map Projection & Zone: Ellipsoid: Clarke- 1866 US State Plane Coordinate System 1927 Alaska, Zone 4 Local Coordinate Reference: Site Centre Location of Field Centre: N/A Field Centre Map Easting: fi: Field Centre Map Northing: fi: Direction of Local North: Gdd Local Vertical Reference: Wellpath Datum Field Datum: Mean Sea Le~ Geomagnetic Model: WMM_95 Site: Ddll Site#14-18 EOA Prudhoe Bay Site Centre: 674699.20 ft E 70 14 17.177 N Latitude 5938669.50 fi: N 148 35 21.408 W Longitude Site Water Depth: 0.0 ft Magnetic Declination: 28.39 deg Grid Convergence: 1.33 deg Measured Depths Referenced To: Mean Sea Level 0.0 ft above ' Mean Sea Level Well: DS 14-18 Originating From: 0.0 ft +N/-S 0.0 ff +E/-W Map Easting: 674699.20 ft Map Northing: 5938669.50 ft Weilpath: DS 14-18OHASP DS 14-18 Original wellpath obtained from ARCO Origin of Vertical Section: User Defined Direction of Vertical Section: 263.54 deg 285.9 ff +N/-S -1927.5 ff +E/-W Plan Section Information MD lnci Azim TVD +N/-S +E/-W DLS Build Turn TFO Target ff deg deg ft ff ff d/100ft d/100ft d/10Oft deg 9200.0 34.50 291.74 8580.3 285.9 -1927.5 0.00 0.00 0.00 0.00 9285.0 :36.04 293.92 8649.7 305.0 -1972.7 2.34 1.81 2.56 39.24 9463.6 93.98 272.23 8722.6 332.4 -2124.2 34.00 32.46 -12.14 -25.00 10250.0 93.73 224.78 8666.5 53.1 -2833.3 6.02 -0.03 -6.03 -88.60 10346.1 90.00 229.21 8663.4 -12.4 -2903.6 6.02 -3.88 4.61 130.00 10650.0 89.45 262.63 8664.9 -134.7 -3177.1 11.00 -0.18 11.00 91.00 12060.1 89.16 287.45 8682.2 -11.8 -4570.7 1.76 -0.02 1.76 90.80 Section 1: BT2 TVD Part 1. Build 1.81 Turn MD lncl Azim TVD +N/-S +E/-W VS DLS Build Turn TFO ff deg deg ff ff ff ff d/10Oft d/100ff d/10Oft deg 9200.0 34.50 291.74 8580.3 285.9 -1927.5 0.0 0.00 0.00 0.00 0.00 9285.0 36.04 293.92 8649.7 305.0 -1972.7 42.8 2.34 1.81 2.56 40.13 Section 2: DT1 MD Part 1 Build 32.45 Turn MD lncl A~m TVD +N/-S +E/-W VS DLS Build Turn TFO ft d~j d~j fi: fi: ft fi d/lOOff d/lOOft d/lOOfl: d~g 9300.0 40.70 290.62 8661.4 308.5 -1981.3 50.9 34.00 31.14 -22.02 -25.00 9400.0 73.06 277.74 8715.5 327.0 -2061.6 128.6 34.00 32.36 -12.88 -22.41 9463.6 93.98 272.23 8722.6 332.4 -2124.2 190.2 34.00 32.91 -6.66 -15.07 Company: North Slope, Alaska Field: All North Slope Fietds Site: Ddll Site #14-18 Well: DS 14-18 Wellpath: DS 14-18 OH ASP Date: 9/24/97 Time: 09:18:05 Page: Co-ordinate(NE) Reference: Wellhead: DS 14-18, Grid North Vertical (TVD) Reference: Field: Mean Sea ~ Section (VS) Reference: User (-1927.5E,285, gN,263.5AzJ) Plan: 14-18 A Tr. Rel. Section 3: DT1 MD Part 1 Drop 0.03 Tum - MD lncl Azim TVD +N/-S +E/-W VS DLS Build Turn TFO ff deg deg ff ff ff ff d/100ft d/lOOft d/100ft deg 9500.0 94.04 270.04 8720.1 333.1 -2160.5 226.2 6.02 0.14 -6.03 -88.60 9600.0 94.14 264.00 8713.0 327.9 -2260.1 325.7 6.02 0.11 -6.03 -88.75 9700.0 94.21 257.97 8705.7 312.3 -2358.5 425.3 6.02 0.06 -6.04 -89.18 9800.0 94.22 251.93 8698.3 286.4 -2454.8 523.9 6.02 0.02 -6.04 -89.62 9900.0 94.19 245.89 8691.0 250.5 -2647.8 620.3 6.02 -0.03 -6.04 -90.07 10000.0 94.12 239.86 8683.7 205.1 -2636.5 713.6 6.02 -0.08 -6.04 -90.51 10100.0 93.99 233.82 8676.7 150.5 -2720.0 802.7 6.02 -0.12 -6.03 -90.95 10200.0 93.83 227.79 8669.8 87.5 -2797.3 886.6 6.02 -0.17 -6.03 -91.38 10250,0 93.73 224.78 8666.5 53.1 -2833.3 926.3 6.02 -0.20 -6.03 -91.79 Section 4: DT3 Inc. Part I Drop -3.88 Tur MD incl AzJm TVD +N/-S +E/-W VS DLS Build Turn TFO ff deg cleg fi: ff ff ff d/lOOfi d/lOOfl: d/lOOft deg 10300.0 91.79 227.08 8664.1 18.3 -2869.2 965.8 6.02 -3.87 4.61 130.00 10346.1 90.00 229.21 8663.4 -12.4 -2903.6 1003.4 6.02 -3.88 4.60 130.11 Section 5: DT1 MD Part 1 Drop 0.18 Turn 1 MD lncl Azim TVD +NI-S +E/-W VS DLS Build Turn TFO ft deg deg ft fi: ft fi d/l(X)ff d/100ft cl/lO0fi deg 10400.0 89.90 235.13 8663.5 -45.5 -2946.1 1049.4 11.00 -0.19 11.00 91.00 10500.0 89.71 246.13 8663.8 -94.4 -3033.1 1141.4 11.00 -0.19 11.00 90.99 10600.0 89.53 257.13 8664.5 -125.9 -3127.9 1239.1 11.00 -0.18 11.00 90.96 10650.0 89.45 262.63 8664.9 -134.7 -3177.1 1289.0 11.00 -0.17 11.00 90.88 Section 6: DT1 MD Part 1 Drop 0.02 Turn 1 MD loci Azim TVD +N/-S +E/-W VS BLS Build Turn TFO 10700.0 89.44 263.51 8665.4 -140.7 -3226.7 1339.0 1.76 -0.02 1.76 90.80 ,.4, _.4 10900.0 89.39 267.03 8667.4 -157.2 -3426.0 1538.8 1.76 -0.02 1.76 90.77 11000.0 89.37 268.79 8668.5 -160.9 -3525.9 1638.5 1.76 -0.02 1.76 90.76 ,, 11100.0 89.34 270.55 8669.7 -161.4 -3825.9 1737.9 1.76 -0.02 1.76 90.74 11200.0 89.32 272.31 8670.8 -158.9 -3725.8 1837.0 1.76 -0.02 1.76 90 72 ~. _90'70 "~ / 11300.0 89.30 274.07 8672.0 -153.4 -3825.7 1935.6 1.76 -0.02 1.76 11400.0 89.28 275.83 8673.3 -144.7 -3925.3 2033.6 1.76 -0.02 1.76 ,, ,- 11500.0 89.26 277.59 8674.5 -133.1 -4024.6 2130.9 1.76 -0.02 1.76 90.-65' 11600.0 89.24 279.35 8675.8 -118.3 -4123.5 2227.5 1.76 -0.02 1.76 90.63 11700.0 89.22 281.11 8677.2 -100.6 -4221.9 2323.3 1.76 -0.02 1.76 90.61 ~/C~orage '~-"""~'['~" ~io~ 11800.0 89.21 282.87 8678.5 -79.8 -4319.7 2418.2 1.76 -0.02 1.76 90.58 11900.0 89.19 284.63 8679.9 -56.0 -4416.8 2612.0 1.76 -0.02 1.76 90.56 12000.0 89.17 286.39 8681.4 -29.3 -4513.2 2604.7 1.76 -0.02 1.76 90.54 12060.1 89.16 287.45 8682.2 -11.8 -4570.7 2659.9 1.76 -0.02 1.76 90.51 Targets Map Unit Map Unit <~ Latitude ~> <~ Longitude Name Incl Azhn TVD +N/-S +EI-W Northing Easting Deg Min Sec Deg Mtn Sec KOP 0.00 0.00 8649.7 259.1 -1979.2 5938928.62 672719.95 70 1420.173 N 148 36 18.752 W T2 0.00 0.00 8663.0 38.8 -2849.1 5938706.30 671850.08 70 1418.182 N 148 3644.178W T1 0.00 0.00 8672.0 68.5 -2628.4 5938736.03 672070.84 70 1418.425 N 146 38 37.743 W T3 0.(30 0.00 8682.0 -13.6 -4570.7 5938655.94 670128.46 70 1418.071 N 146 3734.242W P5 0.00 0.00 8700.0 -180.0 -2784.1 5938489.46 671915.08 70 1416.036 N 146 3642.433W P1 0.00 0.00 8700.0 607.4 -2015.7 5939276.91 672683.64 70 1423.606 N 146 :3619.578W P3 0.00 0.00 8700.0 161.9 -4566.7 5938831.37 670132.53 70 1419.795 N 148 3734.009W P2 0.00 0.00 8700.0 171.4 -2826.0 5938840.86 671873.22 70 1419.500 N 146 36 43.417 W P4 0.00 0.00 8700.0 -188.5 -4574.8 5938480.96 670124.40 70 1416.352 N 148 3734.475W P6 0.00 0.00 8700.0 205.4 -1924.9 5938874.88 672774.26 70 1419.632 N 146 36 17.209W 4-1/2" Tubing SWS Nipple 8776' Packer 8836' SWS Nipple 8876' SWN Nipple 8944' Tbg Tail 8960' DS 14-18A Proposed CT Sidetrack Horizontal 4-1/2" GLM's Liner Top 8913' Top of 2-7/8" in 4-1/2" Tbg. tail. 9-5/8" Csg. Shoe @9266' Whipstock set in 7" @9280' 2-7/8" slotted liner cut in 7" at -9285 - 9290' ! 3-3/4" Open hole TD @ - 12500' Current Zone 4 perforations plugged C T Drilling Wellhead De'~._, ~ CT Injector Head Methanol Injection Otis 7" WLA Quick Connect  ~ Stuffing Box (Pack-Off), 10,000 psi Working Pressure '~ I -- 7" Riser I I Annular BOP (Hydril),7-1/16" ID 5,000 psi working pressure Alignment Guide Flange 7-1/16", 5M Ram Type Dual ~ Gate BOPE Flanged Fire Resistant Man Kelly Hose to Dual HCR Choke Manifold Cutters or Combination Cutter/Blinds Slip / Pipe rams Manual Valves Drilling spool 7-1/16", 5M by 7-1/16", 5M Ram Type Dual Gate BOPE Manualover Hydraulic 7-1/16" ID with Pipe/Slip Rams Manual Master Valve 0.458' (5.5") rl -I 2" Pump-In ,~Tubing Hanger Fire resistant Kelly Hose to Flange by Hammer up 1/4 Turn Valve on DS Hardline to Standpipe manifold 9-5/8" Annulus 13-3/8" Annulus Mu~ Tanks 60/40 I TrplxI I-ire Ext, Shop Fuel Boilers Water Pump Roor Fire Ext. Ext. Pipe ra~//~ r-C/) EDOWell Drilling I quipment Trailer Preferred Major Equipment Layout for CT Drilling · WELL PERMIT CHECKLIST COMPANY FIELD & POOL ('~ ,~"",~::~,,~,,...5'",~::::~ INIT CLASS WELL NAME ,/~/'~/__,~ /z/p/./,,O~,,,~ /-o., / GEOL AREA · PROGRAM: exp [] dev/i~redrll,~serv [] wellbore seg C ann. disposal para req U ~" ? O UNIT# ,/./~'.~ ON/OFF SHORE ,,'2/t.) ADMINISTRATION 3. 4. 5. 6. 7. 8. 9. 10. 11. 12. 13. Permit fee attached ....................... Lease number appropriate ................... Unique well name and number .................. Well located in a defined pool .................. Well located proper distance from drilling unit boundary .... Well located proper distance from other wells .......... Sufficient acreage available in drilling unit ............ If deviated, is wellbore plat included ............... Operator only affected party ................... Operator has appropriate bond in force ............. Permit can be issued without conservation order ........ Permit can be issued without administrative approval ...... Can permit be approved before 15-day wait ........... ENGINEERING 14. Conductor string provided ................... Y N 15. Surface casing protects all known USDWs ........... Y N 16. CMT vol adequate to circulate on conductor & surf csg ..... Y N 17. CMT vol adequate to tie-in long string to surf csg ........ Y N 18. CMT will cover all known productive horizons .......... 19. Casing designs adequate for C, T, B & permafrost ....... 20. Adequate tankage or reserve pit ................. 21. If a re-drill, has a 10-403 for abandonment been approved... 22. Adequate wellbore separation proposed ............. 23. If diverter required, does it meet regulations .......... 24. Drilling fluid program schematic & equip list adequate ..... 25. BOPEs, do they meet regulation .......... 26. BOPE press rating appropriate; test to '~, ~ psigl 27. Choke manifold complies w/APl RP-53 (May 84) ........ 28. Work will occur without operation shutdown ........... 29. Is presence of H2S gas probable ................. GEOLOGY A~PPR DATE 30. Permit can be issued w/o hydrogen sulfide measures ..... Y./,N 31. Data presented on potential overpressure zones ....... //'¢ N /~/', 32. Seismic analysis of shallow gas zones ............ /,/' Y N -33. Seabed condition survey (if off-shore) .......... .,/¢ . Y N 34. Contact name/phone for weeklyproqress reports . . ~... Y N [explora"tory only] REMARKS GEOLOGY: ENGINEERING: COMI~.ISSION: JDH ~ RNC.~ Comments/Instructions: HOW/Ijt - A:\FORMS\cheklist rev 09/97 Well History File APPENDIX Information of detailed nature that is not particularly germane to the Well Permitting Process but is part of the history, file. To improve the readability of the Well History file and to simplify finding information, information of this nature is accumulated at the end of the file under APPENDIX. No special effort has been made to chronologically organize this category of information. Tape Subfile 1 is type: LIS ~*~* REEL HEADER HWD 99/11/lS BHI O1 LIS Custoraer Format Tape ~*~* TAPE HEADER MWD 99/11/16 104819 01 ! 3/4" NaviGarama - Gamma Ray data LIS COHMENT RECORD(s): ~23456789~~23456789~~23456789~~23456789~~23456789~~23456789~~23456789~~23456789~ -Version Information VERS. 1.20: WRAP. NO: -Well infcrmation Block Remark File Version 1.000 ExEract File: Header.las ff, i'4NEM.UNIT Data Type CWLS log ASCII Standard -VERSION 1.20 One line per frame STRT F STOP F STEP F NULL COMP WELL FLD LOC CNTY STAT SRVC TOOL REP DATE API Information 9235.0000: Starting Depth 10820.0000: Ending Depth 0.5000: Level Spacing -999.2500: ~sent Value COMP~Y: ARCO Alaska, Inc. WELL: 14-18A FIELD: Prudhoe Bay Unit LOCATION: 1659' FNL COUNTY: North Slope STATE: Alaska SERVICE COMPANY: Baker Hughes INTEQ TOOL N~4E & TYPE: 1 3/4" NaviGa~a - Gamma Ray JOB REFERENCE: 104819 LOG DATE: 15 May 1999 API NUMBER: 500292055101 ~Pararaeter Information Block #HNEM. UNiT Value Description ~h SECT. TOWN. N RANG. P DAT. EPD . F LMF . FAPD. F DM F EKB F EDF F EGL F CASE F OS! ~Remarks (3~ 1783' FEL : -Field Location ~ : Section 10N : Township 14E : Range HSL : Permanent Datum 71' : Elevation Of Perm. Datum KB : Log Measured From 71 : Feet Above Perm. Datum KB : Drilling Measured From 71' : Elevation Of Kelly Bushing N/A : Elevation Of Derrick Floor N/A : Elevation Of Ground Level 10040 : Casing Depth DIRECTIONAL : Other Services Line 1 Ail depths are Measured Depths (MD) unless otherwise noted. All depths are Bit Depths unless otherwise noted. All Gamma Ray data (GRAX) presented is realtime data. The section from 9243' MD (8580' SSTVD} to 10725' MD {8672' SSTVD) is consclidated with the leg of Well 14-18APB4. Further details , .... i999 Oil & Comm ion of this section can be obtained from the log of Well 14-18APB4. (5) Well 14-18A was sidetracked @ 10725' MD (8672' SSTVD) from the we!lbore of Well 14-18APB4. (6) ¥lell 14-18A was drilled to TD @ 10813' MD (8670' SSTVD) on Run 18. (7) The interval from 10792' MD (8670' SSTVD) to 10813' MD (8670' SSTVD) was nct logged due to sensor tc bit depth. (8) A Hagnetic Declination correction of 27.84 degrees has been applied ~_o the Directicnai Surveys. -Mnemonics GRAX -> Gamma Ray HWD-AP! [H?~D] (MWD-API units) ROPS -> Rate ef Penetration, feet/herr SSTVD -> Subsea T_~ue Vertical Depth, feet ~Sensor Offsets RUN GAHMA D I RE C T i ONAL 14 20.61 ft. 24.76 ft. 15 21.01 ft. 25.16 ft. 16 20.78 ft. 24.93 ft. 17 25. 18 ft. 21.03 ft. 18 25.38 ft. 21.23 ft. Tape Subfile: i 67 records... Minimura _record length: 14 bytes Maxiraura record length: 132 bytes [] Tape Subfile 2 is type: LIS FILE HEADER ***~ H'WD .00i 1024 INFORMATION TABLE: CONS MN Eld VALU LCC 150 CN ARCO Alaska, Inc. WN 14-!8A FN Prudhoe Bay Unit COUN North Slcpe STAT Alaska LIS COMMENT RECORD(s): ~23456789~~23456789~~23456789~~23456789~~23456~89~~23456789~~23456789~~23456789~ ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! Remark File Version 1.000 1. The data presented here has been edited from the field raw data. 2. The data has been depth shifted to match the PDC supplied by ARCO Alaska, Inc. 3. The PDC used is the PDS' open hole Ga~a Ray daEa, dated August 29, 1998. INFORMATION TABLE: CIFO ldNEM CHAN DIMT CNAM ODEP 1 GR 2 ROP * FORMAT RECORD (TYPE# 64) Entry Type( !) Size( i) Data record type is: GRAf{ 0.0 ROPS 0.0 Repcode( 66) 0 Ennry Type { 2 ) Size 1 Repcode 66 Datum Specification Block Type is: 0 Entry Type( 3) Size 2 Repcode 79 Datum Frame Size is: 12 bytes Entry Type( 4) Size ! Repcode 66 Legging directiob~ is down (value= 2S5) Entry Type( 5) Size i Repcede 66 Optical hog Depth Scale Units: Feet Entry Type{ 8) Size 4 Repcede 68 Frame spacing: 0. 500000 Entry Type( 9) Size 4 Repcode 65 Frame spacing units: F ] fndun c [ F ] 1 . 00000000 3 Entry Type( 11) Size( 4) Repcode( 68) Number of frames per record is: 84 Entry Type( 13) Size( 1) Repcode( 66) One depth per frame (value= 0) Entry Type( 16) Size( 1) Repcode( 66) Datum Specification Block Sub-type is: Entry Bicck terminator. Summary of entry types encountered: i 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 i ! 1 1 1 0 0 1 1 0 t 0 1 0 0 1 Rep Code Count Bytes 68 2 8 Sum: 2 8 ~ndun a [F ] !.00000000 [] FR.~'{E SPACE = 0.500 ~ F ONE DEPTH PER Tape depth ID: F 2 C~lrves: Name Tcci Code Samples Units Size 1 GR i'4WD 68 1 AP I 4 2 Re P MWD 68 1 4 DATA RECORD (TYPE# 0) Total Data Records: 38 1014 BYTES AP1 AP1 API API Log Crv Crv Length T}~ T~rp C!s Hod 4 99 995 99 i 4 99 995 99 i Tape File Start Depth = 9235.000000 Tape File End Depth = 10820.000000 Tape File Level Spacing = 0.500000 Tape File Depth Units = Feet FILE TRAILER **** LIS representation code decoding su~ary: Rep Code: 66 1 datum Rep Code: 68 9517 datums Rep Code: 79 2 datums Tape Subfile: 2 45 records... Minimura record length: 54 bytes Haxiraum record length: 1014 bytes Tape Suhfile 3 is type: LIS **+* FILE HEADER i'4WD . 00i 1024 INFORMATION TABLE: CONS H N Ei.,{ VA LU LCC 150 CN ARCO Alaska, inc. WN i4-i8A EN Prudhce Bay Unit COUN North Slope STAT Alaska LIS COHHENT RECORD(s): ~23456789~23456789~23456789~23456789~23456789~23456789~23456789~23456789~ ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! Remark File Version 1.000 I. The data presented here is the unedited field raw data. iNFORMATiON TABLE: CIFO MN EM C HAN D i MT CN~2{ ODE P i GRAX GRAX 0.0 2 ROPS ROPS 0.0 FORMAT RECORD (TYPE# 64 Entry Type{ i) Size i Data record type is: Entry Type( 2) Size 1 Datum Specification Block Entry Type( 3) Size 2 Datum Frame Size is: Entry Type( 4) Size 1 Logging direction is down Entry Type( 5) Size ! Repcode( 66) 0 Repcode{ 66) Type is: 0 Repcode( 79) 12 bytes Repcode( 66) (value= 255) Repcode( 66) Optical Log Depth Scale Units: Feet Entry Type( 8) Size 4 Repcode( 68) Frame spacing: 0.500000 Entry Type( 9) Size 4 Repcode( 65) Frame spacing units: F ] fndun c [ F ] i. 00000000 3 Entry Type( ii) Size( 4} Repcode( 68) Number of fraraes per record is: 84 Entry Type( 13} Size( !) Repcode( 66) One depth per frame (value= 0) Entry Type( 16) Size( 1) Repcede( 66) Datum Specification Block Sub-type is: Entry Block terrainator. Summary of entry types encountered: 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 1 1 ! ! ! 0 0 i ! 0 1 0 1 0 0 1 Rep Code Count Bytes 68 2 8 Sure: 2 8 fndun a IF i 1.00000000 FR.~PIE SPACE = 0.500 ~ F ONE DEPTH PER Tape depth ID: F 2 Curves: Name Tool Code Samples tlnits Size i GRAX MWD 6 8 i 4 2 ROPS H~,'? D 68 i 4 DATA RECORD (TYPE# 0) Total Data Records: 38 1014 BYTES * Tape File Start Depth = 9235.000000 Tape File End Depth = 10820.000000 Tape File Level Spacing = 0.500000 Tape File Depth Units = Feet FILE TRAILER LiS representation code decoding subtlety: Rep Code: 66 i datum Rep Code: 68 9517 datums Rep Code: 79 2 datums Tape Subfile: 3 45 records... 14inimum reseed iengnh: 54 bytes Maximum recc~d length: 1014 bytes Tape Subfiie 4 is nype: LiS +*** TAPE TRAILER **** MWD 99/11/16 104819 0i AP1 AP1 AP1 AP1 Log Crv Crv Length T-fp Typ Cls Mod 4 99 995 99 1 4 99 995 99 i **~* REEL TRAILER **** M~,ID 99/11/16 BHI 01 Tape Sub~i!e: 4 Minimum record length: Maximum ~eccrd length: 2 records... 132 bytes t32 bytes End of execution: Tue 16 NOV 99 6:06p Elapsed e:-:ecur~icn time = 1.59 seconds. SYSTEM RETURN CODE = 0 Tape Subfile 1 [] Tape Subfile 2 is type: LIS is type: LIS DEPTH 923S. 923S. 9300. 9400. 9500. 9600. 9700. 9800. 9900. !0000 10i00 10200 10300 10400 10500 10600 10700 10800 10820 0000 5000 0000 0000 0000 0000 0000 0000 0000 0000 0000 0000 0000 0000 0000 0000 0000 0000 0000 GR -999.2500 -999.2500 139.0120 116.1290 117.8870 128.4350 72.5280 88.3940 77 7920 102 7480 137 6100 215 5890 68 1750 84 0950 86 1340 215 5890 96 3270 -999 2500 -999 2500 ROP -999.2500 -999.2500 56.2000 77.3060 132.8570 150.0000 171.4000 180.0000 180 0000 87 8000 il 1000 34 6000 66 4910 5O 7O0O 25 7000 21 1000 10 9000 78 2000 -999 2500 [] Tape Tape Tape Tape Tape Sub fi File Start Depth File End Depth File Level Spacing File Depth Units le 3 is type: LIS 9235.000000 10820.000000 0.500000 Feet DEPTH 9235 0000 9235 5000 9300 0000 9400 0000 95OO 0000 9600 0000 9700 0000 9800 0000 9900 0000 i0000 0000 i0100 0000 10200 0000 10300 0000 10400 0000 10500.0000 10600.0000 10700.0000 10800.0000 10820.0000 GRAX -999 -999 81 256 79 91 72 83 77 118 228 253 88 88 92 167 96 -999 -999 2500 2500 1970 1830 4910 8670 2660 2580 3480 9660 2460 8140 2600 7170 5050 0980 3270 2500 2500 ROPS -999 2500 -999 2500 21 8000 135 9270 138 4000 150 0000 171 4000 180 0000 131 8170 82 1260 7 5000 24 0000 63 1000 56 2000 3.3500 27.3000 28.1000 29.6290 -999.2500 Tape File Start Depth = 9235.000000 Tape File End Depth = 10820.000000 Tape File Level Spacing = 0.500000 Tape File Depth Units = Feet Tape Subfite 4 is type: LIS Tape Suhfile 1 is type: LIS ~*** REEL HEADER M?,ID 99/11/ 3 BHt LIS Customer Format Tape ~*** TAPE HEADER **** HtV D 99/11/ 3 104819 0i ! 3/4" NaviGamma - Gamma Ray data LIS COMMENT RECORD(s): 12345678901234567890123456789012345678901234567890123456789012345678901234567890 Remark File Version 1.000 Extract File: Header.las -Version Information VERS. 1.20: WRAP'. NO: -Well information Block ,~HNEH.UNIT Data Type STRT. F STOP. F STEP. F NULL COH P ?,/ELL FLD LOC CNTY STAT SRVC TOOL REF DATE API CWLS log ASCII Standard -VERSION 1.20 One line per frame Information 9235.0000: Starting Depth 10805.0000: Ending Depth 0.5000: Level Spacing -999.2500: Absent Value COMP.ANY: ARCO Alaska, Inc. WELL: 14-!8APB4 FIELD: Prudhoe Bay Unit LOCATION: 1659' FNL COUNTY: North Slope STATE: Alaska SERVICE COMPANY: Baker Hughes INTEQ TOOL N~E & TYPE: 1 3/4" NaviGa~ta - Ga~a Ray JOB REFERENCE: 104819 LOG DATE: 10 May 99 API NUMBER: 500292055173 -Parameter Infcrmation Block #HNEM.UNIT Value Description FL SECT TOWN RANG PDAT EPD LMF FAPD DMF EKB EDF EGL CASE OS1 ~Remauks 1283' FEL : Field Location 09 : Section 10N : Township 14E : Range MSL : Permanent Datum 7!~ : Elevation Of Perm. Datum KB : Log Measured From 71 : Feet ~ove Perm. Datum KB : Drilling Measured From 71~ : Elevation Of Kelly Bushing N/A : Elevation Of Derrick Floor N/A : Elevation Of Ground Level N/A : Casing Depth DIRECTIONAL : Other Services Line ! (1) All depths are Measured Depths (MD) unless otherwise noted. (2) Ail depths are Bit Depths unless otherwise noted. (3) Ail Gamma Ray data (GRAX) presented is realtime data. (4} Well 14-18APB4 is represented by Runs 4, 6, 7, 8, 9, !0, il, 12 and 13 which are all Directional with Ga~a Ray. (5) The section from 9243' MD (8580' SSTVD) to 10040' MD (8694' SSTVD) is consolidated with the log of Well 14-18APB3. Further details cf this secticn can be obtained frcm the log of Well 14-18APB3. (6) Well 14-18APB4 was sidetracked @ 10040' MD (8694' SSTVD), from the weilboue of Well 14-18APB2. (7) Well 14-!SA?B4 was drilled to TD @ 10799' MD (8669' SSTVD) on Run 13. (8) The interval from 10778' MD {8669' SSTVD) to 10799' MD (8669' SSTVD) was not logged due to sensor to bit depth. (9) The Gamma Ray log has been edited to match the log of Well 14-18APB3. The log of !4-18APB3 was edited to match the open hole Ga~a Ray log of 14-18APB2, logged by PDS Inc. on 29 August, 1998. =0~ A Macnetic Declination correction of 27.84 degrees has been applied ~c ~he Directional Surveys. ~Mnemonics GRAM -> Gamma Ray HWD-API [MWD] (~4D-API units) ROPS -> Rate of ~enetration, feet/hour TVD -> True Vertical Depth, feet ~Sensor Offsets RUN GAMMA 4 20. 66 ft. 6 21.07 ft. 7 20. 95 ft. 8 20. 84 ft. 9 21. 57 ft. l0 20. 98 ft. il 20. il ft. 12 20. 12 ft. 13 20. 97 ft. DI RE CT i ONAL 24.81 ft 25.22 ft 25.10 ft 24.99 ft 25. 92 ft 25.13 ft 24.32 ft 24.27 ft 25.12 ft Tape Subfile: 1 76 records... Miniraura record length: 14 Maxiraura record length: 132 Tape Subfile 2 is r_ype: LiS bytes bytes FILE HEADER MWD .001 1024 iNFORMATION TABLE: CONS M bi E M VA L U LCC 150 CN ARCO Alaska, Inc. WI-I 14-i8APB4 FN Prudhoe Bay Unit COUN North S!cpe STAT Alaska LIS COMMENT RECORD(s): ~23456789~~23456789~~23456789~~23456789~~23456789~~23456789~~23456789~~23456~89~ ___ ! ! ! ! ! ! ! ! ! ! [ [ ! ! ! ! ! ! ! Remark File Version 1.000 !. The data presented here has been edited from the field raw data. 2. The data has been depth shifted to match the PDC supplied by ARCO Alaska, Inc. 3. The PDC used is the PDS' open hole Ga~ta Ray data, dated August 29, 1998. INFORMATION TABLE: CIFO MNEH CHAN DIMT CNP~M ODEP 1 GR GRAX 2 ReP RePS FORMAT RECORD (TYPE# 64 Ennry Type( 1) Size( 1 Repcode( 66) Data record type is: 0 Entry Type( 2) Size( 1 Repcede( 66} Datum Specification Block Type is: 0 Entry Type( 3) Size( 2) Repcode( 79) Dat~Jm Frame Size is: 12 bytes Entry Type( 4) Size( 1) Repcode( 66) Logging direction is down (value= 255) En%ry Type( 5) Size( i) Repcode 66) Optical Log Depth Scale Units: Feet Entry Type( 8) Size( 4) Repcode 68) 65) 3 68) 84 66) 66) Block Sub-tppe is: Frame spacing: 0.500000 Entry Type( 9) Size( 4} Repcode Frame spacing u~its: [F ] fndun c [F ] 1.00000000 Entry Type( 11) Size( 4) Repcede Number of frames per record is: Entry Type( 13) Size( i) Repcode One depth per frame (value= 0) Entry Type( 16) Size( 1) Repcode Datum Specification Entry Block terminator Summary of ennry types encountered: 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 ! 1 ! 1 1 0 0 1 1 0 ! 0 i 0 0 1 Rep Code Ce un r~ Bl~t es 68 2 8 S 1lin: 2 fndun a [ F ] 8 8 1. 00000000 3 FRAHE SPACE = 0.500 * F ONE DEPTH PER FR~2'4E Tape depth iD: F 2 Curves: Name Tool Code Samples Units Size t GR MWD 68 i API 4 2 ReP MF,ID 68 1 4 DATA RECORD (TYPE# 0) 1014 BYTES * Total Data Records: 38 0.0 0.0 AP1 AP1 AP1 AP1 Log Crv Crv Length T!£p Tp Cis Mod 4 99 995 99 1 4 99 995 99 1 8 Tape File Start Depth = 9235.000000 Tape File End Depth = 10805.000000 Tape File Level Spacing = 0.500000 Tape File Depth Units = Feet FILE TRAILER LIS representation code decoding su~ary: Rep Code: 66 i datum Rep Cede: 68 Rep Code: 79 9427 datums 2 datums Tape Subfiie: 2 45 records... Minimum record length: 54 bytes Maximum record length: 1014 bytes Tape Subfile 3 is tsqse: LIS **** FILE HEADER **** MWD .00 i 1024 INFORMATION TABLE: CONS MN EH VALU LCC 150 CN ARCO Alaska, Inc. WN 14-iSAPB4 Fi,! Prudhoe Bay Unit COUN North Slope STAT Alaska LIS COMMENT RECORD(s): ~23456789~~23456789~~23456789~~23456789~~23456789~~23456789~~23456789~~23456789~ ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! Remark File Version 1.000 !. The data presented here is the unedited field raw data. INFORMATION TABLE: C!FO MNEi4 CHAN DIMT CN/~M ODEP ! GRAX GRAX 0.0 2 ROPS ROPS 0.0 FORMAT RECORD (TYPE# 64 Ennry Type( !) Size( i Data record type is: Enzry Type( 2) Size( i Datum Specification Block Entry Type( 3) Size( 2 Datura Frame Size is: Entry Type( 4) Size( 1 Logging direction is down Entry Type( 5) Size( 1 Repcode 66 0 Repcode 66 Type is: 0 Repcode 79 12 bytes Repcode 66 (value= 255) Repcode 66 Optical Leg Depth Scale Units: Feet Entry Type( 8) Size{ 4 Repcode 68 Frame spacing: 0.500000 Entry Type( 9) Size{ 4 Repcede 65 Frame spacing units: [F ] fndun c [F ] !.00000000 3 Entry Type( 1t) Size{ 4) Repcode( 68) Number of ~rames per record is: 84 Entry Type( 13) Size{ 1) Repcode( 66) One depth per frame (value= 0) Entry Type{ 16) Size( 1) Repcede{ 66) Datum Specification Block Sub-tpe is: Entry Block ~erminator. Suramary of entry types encountered: 1 2 3 i i i Rep Code 68 Surf~: fnd~ln a [ F 4 5 i 1 2 2 6 7 8 9 10 11 12 13 14 15 16 0 0 i i 0 1 0 1 0 0 1 Bytes 8 8 8 1.00000000 3 FRI~,'{E SPACE = 0.500 * F ONE DEPTH PER Tape depth ID: 2 C~2rves: i,iarae Tcoi Code Samples Units Size ! GRAX MWD 68 1 4 2 RePs MWD 68 1 4 DATA RECORD {TYPE# 0) Total Data Records: 38 1014 BYTES * Tape File Start Depth = 9235.000000 Tape File End Depth = 10805.000000 Tape File Level Spacing = 0.500000 Tape File Depth Units = Feet FILE TRAILER LIS representation code decoding su~ary: Rep Code: 66 I datum Rep Code: 68 9427 datums Rep Code: 79 2 datums Tape Subfile: 3 45 records... Minimum record length: 54 bytes Maximum record length: 1014 bytes [] Tape Subfile 4 is type: LIS ~+* TAPE TRAILER HWD 99/11/' 3 104819 0i AP1 AP1 AP1 API Log Crv Crv Length Typ T!zp Cis Hod 4 99 995 99 ! 4 99 995 99 i **** REEL TRAILER HWD 99/11/ 3 BHI 01 Tape Subfiie: 4 2 records... Minimum record length: 132 bytes l'4a?:imurn record length: 132 bytes End of execution: Wed 3 NOV 99 8:59p Elapsed execution time = 1.42 seconds. SYSTEM RETURN CODE = 0 [] Tape Subfile 1 [] Tape Subfile 2 is type: LiS is type: LIS DEPTH 9235 9235 9300 9400 9500 9600 9700. 9800. 9900. 10000. i0!00. 10200. 10300. 10400. 10500. 10600. t0700. 10800. 10805. 0000 5000 0000 0000 0000 0000 0000 0000 0000 0000 0000 0000 0000 0000 0000 0000 0000 0000 0000 GR -999 2500 -999 2500 139 0120 116 1290 117 8870 128 4350 70 5130 88 3940 77 7920 102 7480 125 3780 223 5880 68 1750 84.0950 86.1340 215.5890 96.3270 -999.2500 -999.2500 ROP -999 -999 56 77 132 150 171 180 180 87. 17. 33 66 5O 25 21 10 68. -999. 25OO 2500 2000 3060 8570 0000 4000 0000 0000 8000 9960 8830 4910 7000 7000 1000 9000 6780 2500 Tape File Start Depth = 9235.000000 Tape File End Depth = 10805.000000 Tape File Level Spacing = 0.500000 Tape File Depth Units = Feet Tape Subfile 3 is type: LIS DEPTH 9235 9235 9300 9400 9500 9600 9700 9800 9900 I0000 10100 10200 10300 10400 10500 10600 i0700 10800 10805 GRAX ROPS 0000 -999.2500 -999. 5000 -999.2500 -999. 0000 81.1970 21. 0000 256.1830 135. 0000 79.4910 138. 0000 91.8670 150. 0000 72.2660 171. 0000 83.2580 180. 0000 77.3480 131. 0000 118.9660 82 0000 228.2460 7 0000 253.8140 24 0000 88.2600 63 0000 88.7170 56 0000 92.5050 3 0000 167.0980 27 0000 96.3270 28 0000 -999.2500 -999 0000 -999.2500 -999 25OO 2500 8000 9270 4000 0000 4000 0000 8170 1260 5000 0000 1000 2000 3500 3000 1000 2500 2500 [] Tape Tape File Start Depth = 9235.000000 Tape File End Depth = 10805.000000 Tape File Level Spacing = 0.500000 Tape File Depth Units = Feet Subfile 4 is type: LIS Tape Subfile i is type: LIS **** REEL HEADER MWD 99/10/15 BHI O1 LIS Customer Format Tape **** TAPE HEADER MWD 99/10/15 104819 01 1 3/4" NaviGamma - Gamma Ray data LIS COMMENT RECORD(s): ~23456789~~23456789~~23456789~~23456789~~23456789~~23456789~~23456789~~23456789~ Remark File Version 1.000 Extract File: Header.las -Version Information VERS. 1.20: W~{P. NO: -Well Information Block #MNEM.UNIT Data T~vpe STRT F STOP F STEP F NULL C DY., P WELL FLD LOC CNTY STAT S RVC TOOL REF API 9240.0000: 10440.0000: _.5000: -999.2500: COMPD~iY: WELL: ~T~T ~. LOCATION: STATE: SERVICE COMPANY: TOOL ~AME & TYPE: JOB REFERENCE: LOG u~: API NUMBER: rm~ .~ ~ .... ASCii Standard -?ERSiON ! 20 C:.ne line per frame Information Starting Depth Ending Depth Level Spacing Absent Value ARCO Alaska, inc. i4-18APB3 Prudhoe Bay Unit 1659' FNL North Slope Alaska Baker Hughes INTEQ 1 3/4" NaviGamma - Gamma Ray 104819 3 May 1999 500292055172 -Parameter Information Block #MNEM. UNiT Value Description FL 1783' FEL : Field Location .~FCT. 9 : Section .......~ ~,,:,~ .N i0N : Township ~4G. 14E : Range PDAT. MSL : Permanent Datum EPD .M 71' : Elevation Of Perm. Datum LMF . KB : Log Measured From ....~A~D F ~,~ : Feet ~ove Perm. Datum DMF . KB : n,-~ng Measured From EKB F 71' : Elevation Of Kelly Bushing EDF .F N/A : Elevation Of Derrick Floor EGL .F N/A : Elevation Of Ground Level CASE.F ===~'~'~= : Casing Depth ,~oz ..... ~.~n~RECTiONAL : Other Services Line 1 ~Remarks (1) All depths are Measured Depths (MD) unless otherwise noted. (2) Ail depths are Bit Depths unless otherwise noted. (3) Ail Gamma Ray data (GRAX) presented is realtime data. (4) Well 14-18APB3 is represented by Runs 1 & 3 which are Directional with Gamma Ray. RECEIVED 19 1999. (5) Well 14-iSA?B3 was kicked off @ 10065' MD (8692' SSTVD), from the wellbore of Well 14-18FBi. (6)Well 14-18APB3 was drilled to TD @ 10433' MD (8661' SSTVD) on Run 3. (7) The interval from 10411' MD (8663' $STVD) to 10433' MD (8661' SSTVD) was not logged due to sensor to bit depth. (8) The Gamma Ray log has been depth shifted to match the open hole Gamma Ray log of wellbore 14-18APB2 logged on 29 August 1998. The log has been matched to 14-18APB3 till 9950' MD only. (9) A Magnetic Declination correction of 27.84 degrees has been applied to the Directional Surveys. -Mnemonics GRAX -> Gamma Ray MWD-API [MWD! (MWD-API units) ROPS -> Rate of Penetration, feet/hour TVD -> True Vertical Depth, feet -Sensor Offsets RUN GAMMA DIRECTIONAL 1 21.17 ft. 25.31 ft. 3 20.98 ft. 25.12 ft. Tape Subfiie: I 66 records... Minimum record length: 14 bytes Maximum record length: 132 bytes Tape Subfile 2 is type: LIS FILE HEADER MWD .001 1024 INFORMATION TABLE: CONS MNEM VALU LCC 150 CN ARCO Alaska, Inc. WN 14-18APB3 FN Prudhoe Bay Unit COUN Ndrth Slope STAT Alaska LIS COMMENT RECORD(s): ~23456789~~23456789~~23456789~~23456789~~23456789~~23456789~~23456789~~23456789~ ! !!!!! ! !!!!!! !! !!!! Remark File Version 1.000 1. The data presented here has been edited from the field raw data. 2. The data has been depth shifted to match the PDC supplied by ARCO Alaska, Inc. 3. The PDC used is the PDS' open hole Gamma Ray data, dated August 29, 1998. INFORMATION TABLE: CIFO MNEM CHAN DIMT CNAM ODEP t GR 2 ROP * FORMAT RECORD (TYPE# 64) Entry Type( 1) Size( 1) Data record type is: Entry Type( 2) Size( 1) G~=~ 0.0 ROPS 0.0 Repcode( 66) 0 Repcode( 66) Datum Specification'Block Type is: 0 Entry Type( 3) Size( 2) Repcode( 79) Datum Frame Size is: 12 bytes Entry Type( 4) Size( 1) Repcode(66) Logging direction is down (value= 255) Entry Type( 5) Size( 1) Repcode( 66) Optical Log Depth Scale Units: Feet Entry Type( - 8) Size( 4) Repcode(68) Frame spacing: 0.500000 Entry Type( 9) Size( 4) Repcode(65) Frame spacing units: [F ] fndun c [F ] 1.00000000 3 Entry Type( 11) Size( 4) Repcode( 68) Number of frames per record is: 84 Entry Type(13) Size( 1) Repcode(66) One depth per frame (value= 0) Entry Type(16) Size( 1) Repcode(66) Datum Specification Block Sub-type is: 1 Entry Block terminator. Summary of entry types encountered: 1 2 3 4 5 6 7 8 9 10 11 12 13 i4 15 16 1 1 1 1 1 0 0 1 1 0 1 0 1 0 0 1 Rep Code Count Bytes 68 2 8 Sum: fndun a [ F ] 2 8 8 1.00000000 3 FRAME SPACE = 0.500 * F ONE DEPTH PER FRAME Tape depth ID: F 2 Curves: Name Tool Code Samples Units Size 1 GR MWD 68 1 API 4 2 ROP ~D 68 .i 4 DATA RECORD (TYPE# 0) 1014 BYTES Total Data Records: 29 API API API API Log Crv Crv Length T_V!p Typ Cls Mod 4 99 995 99 1 4 99 995 99 I Tape File Start Depth = 9240.000000 Tape File End Depth = 10440.000000 Tape File Level Spacing = 0.500000 Tape File Depth Units = Feet FILE TRAILER LIS representation code decoding summary: Rep Code: 66 1 datum Rep Code: 68 7207 datums Rep Code: 79 2 datums Tape Subfiie: 2 36 records... Minimum record length: 54 bytes Maximum record length: 1014 bytes Tape Subfile 3 is type: LIS ~*** FILE HEADER MWD .001 1024 INFORMATION TABLE: CONS VALU __ LCC 150 CN ARCO Alaska, Inc. WN 14-18APB3 FN Prudhoe Bay Unit COUN North Slope STAT Alaska LIS COMMENT RECORD(s): ~23456789~~23456789~~23456789~~23456789~~23456789~~23456789~~23456789~~23456789~ ... !! ! !!!!!!! !! !!~ ~ Remark File Version 1.000 1. The data presented here is the unedited field raw data. INFORMATION TABLE: CIFO MNEM CHAN DIMT CNB~ ODEP ! G~< GRAX 0.0 2 ROPS ROPS 0.0 FORMAT RECORD (TYPE# 64) Entry Type 1) Size( 1) Repcode(66) Data record type is: 0 Entry Type 2) Size( 1) Repcode 66 Datum Specification Block Type is: 0 Entry Type 3) Size( 2) Repcode 79 Datum Frame Si~e is: i2 bYEes Entry Type 4) Size( 1) Repcode 66 Logging direction is down (value= 255) Entry Type 5) Size( 1) Repcode 66 Optical Log Depth Scale Units: Feet Entry Type 8) Size( 4) Repcode 68 Frame spacing: 0.500000 Entry Type 9) Size( 4) Repcode 65 Frame spacing units: [F ] fndun c [F ] 1.00000000 3 Entry Type( 11) Size( 4) Repcode( 68) Number of frames per record is: 84 Entry Type(13) Size( 1) Repcode(66) One depth per frame (value= 0) Entry Type( 16) Size( 1) Repcode( 66) Datum Specification Block Sub-type is: Entry Block terminator. Summary of entry types encountered: 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 1 1 1 1 1 0 0 1 1 0 1 0 1 0 0 1 Rep Code Count Bytes 68 2 8 Sum: 2 8 fndun a [F ] 1.00000000 [] FRAME SPACE = 0.500 * F ONE DEPTH PER FRAME Tape depth ID: F 2 Curves: Name Tool Code Samples Units Size i GRYuX ,~. ~,~ D 68 i 4 2 ROPS ~.WD 68 ! 4 * DATA RECORD (TYPE# 0) Total Data Records: 29 1014 BYTES Tape File Start Depth = 9240.000000 Tape File End Depth = 10440.000000 Tape File Level Spacing = 0.500000 Tape File Depth Units = Feet FILE TRAILER LIS representation code decoding summary: Rep Code: 66 1 datum Rep Code: 68 7207 datums Rep Code: 79 2 datums Tape Subfile: 3 36 records... Minimum record length: 54 bytes Maximum record length: 1014 bytes Tape Subfile 4 is type: LIS **** TAPE TRAILER MWD 99/10/15 104819 01 API AP1 AP1 AP1 Log Crv Crv Length Typ Typ Cls Mod 4 99 995 99 i 4 99 995 99 1 **** REEL TRAILER MWD 99/10/15 BHI 01 Tape Subfi!e: 4 Minimum record length: Maximum record length: 2 records... 132 bytes 132 bytes End of execution: Fri 15 OCT 99 2:54p Elapsed execution time = 1.42 seconds. SYSTEM RETURN CODE = 0 Tape Subfile 1 is type: LIS [] Tape Subfile 2 is type: LIS DEPTH 9240 9240 9300 9400 9500 9600 9700 9800 9900 10000 10100 10200 10300 10400 10440 GR 0000 -999 5000 -999 0000 139 0000 116 0000 117 0000 123 0000 68 0000 89 0000 77 0000 102 0000 92 0000 96 0000 92 0000 138 0000 -999 2500 2500 0120 1290 887O 3390 4990 5650 7920 7480 1710 7040 1100 9200 2500 ROP -999 2500 -999 2500 56 2000 77 3060 132 8570 150 0000 171 4000 180 0000 180 0000 87 8O00 61.7840 46.9890 116.1000 46.1000 -999.2500 Tape File Start Depth = Tape File End Depth = Tape File Level Spacing = Tape File Depth Units = Feet Tape Subfile 3 is type: LIS DEPTH 9240 9240 9300 9400 9500 9600 9700 9800 9900 10000 10100 10200 10300 10400 10440 .0000 .5000 .0000 .0000 0000 0000 0000 0000 0000 0000 0000 0000 0000 0000 0000 GRAX -999.2500 -999.2500 81.1970 256.1830 79.4910 91. 8670 72.2660 83 2580 77 3480 118 9660 90 6600 95 8360 95 1300 131 3700 -999 2500 Tape File Start Depth = Tape File End Depth = Tape File Level Spacing = Tape File Depth Units Tape Subfile 4 is type: LIS 9240.000000 10440.000000 0.500000 ROPS -999.2500 -999.2500 21.8000 135.9270 138.4000 150.0000 171.4000 180.0000 131.8170 82.1260 50.7000 76.5000 125.3580 30.1120 -999.2500 9240.000000 10440.000000 0.500000 Feet RECEIVED '%999 Sperry-Sun Drilling Services 'LIS Scan Utility Thu Jul 02 12:55:08 1998 Reel Header Service name ............. LISTPE Date ..................... 98/07/02 Origin ................... STS Reel Name ................ UNKNOWN Continuation Number ...... 01 Previous Reel Name ...... '.UNKNOWN Comments ................. STS LIS Writing Library.. Scientific Technical Services Tape Header Service name ............. LISTPE Date ..................... 98/07/02 Origin ................... STS Tape Name ................ UNKNOWN Continuation Number ...... 01 Previous Tape Name ....... UNKNOWN Comments ................. STS LIS Writing Library. Scientific Technical Services Physical EOF Comment Record TAPE HEADER PRUDHOE BAY UNIT MWD/MAD LOGS WELL NAME: API NUMBER: OPERATOR: LOGGING COMPANY: TAPE CREATION DATE: JOB DATA JOB NUMBER: LOGGING ENGINEER: OPERATOR WITNESS: MWD RUN 1 AK-MW-80188 D. LABRECQUE G. GOODRICH 14-18A 500292055101 ARCO ALASKA, INC. SPERRY-SUN DRILLING SERVICES 02-JUL-98 MWD RUN 2 AK-MW-80188 D. LABRECQUE G. GOODRICH MWD RUN 4 AK-MW-80188 D. LABRECQUE G. GOODRICH JOB NUMBER: LOGGING ENGINEER: OPERATOR WITNESS: SURFACE LOCATION SECTION: TOWNSHIP: RANGE: FNL: FSL: FEL: FWL: MWD RUN 5 AK-MW-80188 D. LABRECQUE G. GOODRICH MWD RUN 6 AK-MW-80188 D. LABRECQUE G. GOODRICH 9 I0N 14E 1122 4242 MWD RUN 10 AK-MW-80188 D. LABRECQUE G. GOODRICH ELEVATION (FT FROM MSL 0) KELLY BUSHING: DERRICK FLOOR: GROUND LEVEL: WELL CASING RECORD OPEN HOLE 1ST STRING 2ND STRING 3RD STRING PRODUCTION STRING # REMARKS: 71.00 71.00 .00 CASING DRILLERS BIT SIZE (IN) SIZE (IN) DEPTH (FT) 3.750 9988.0 1. ALL DEPTHS ARE MEASURED DEPTHS (MD) UNLESS OTHERWISE NOTED. 2. MWD RUNS 3,7,8, AND 9 CONTAIN NO VALID DATA AND ARE NOT PRESENTED. 3. MWD RUNS 1,2,4,5,6, AND 10 ARE DIRECTIONAL WITH SCINTILLATION TYPE GAMMA RAY (NGP). 4. THIS WELL REACHED A TOTAL DEPTH (TD) OF 9987'MD, 8695'SSTVD. SROP = SMOOTHED RATE OF PENETRATION WHILE DRILLING. SGRD = SMOOTHED GAMMA RAY. $ File Header Service name ............. STSLIB.001 Service Sub Level Name... Version Number ........... 1.0.0 Date of Generation ....... 98/07/02 Maximum Physical Record..65535 File Type ................ LO Previous File Name ....... STSLIB.000 Comment Record FILE HEADER FILE NUMBER: 1 EDITED MERGED MWD Depth shifted and clipped curves; all bit runs merged.. DEPTH INCREMENT: .5000 FILE SUMMARY PBU TOOL CODE START DEPTH STOP DEPTH GR 9198.0 9955.0 ROP 9221.5 9983.5 $ BASELINE CURVE FOR SHIFTS: CURVE SHIFT DATA (MEASURED DEPTH) BASELINE DEPTH 9198.0 9207.5 9210.0 9212.5 9215.5 9225.5 9237.0 9238.5 9245.5 GR 9200.0 9209.5 9211.5 9213 5 9216 5 9230 0 9240 0 9241 0 9247 5 EQUIVALENT UNSHIFTED DEPTH 9248 9254 9258 9260 9262 9263 9268 9272 9275 9277 9279 9281 9284 9286 9983 $ # .5 .5 .0 .0 .5 .0 .5 .5 0 0 5 5 0 0 5 MERGED DATA SOURCE PBU TOOL CODE MWD MWD MWD MWD MWD MWD $ # REMARKS: 9250.5 9252.0 9255.0 9257.5 9262.5 9263.0 9268.5 9272.0 9275.0 9280.0 9281.5 9285.0 9287.5 9289.5 9987.0 BIT RUN NO MERGE TOP MERGE BASE 1 9225.0 9285.0 2 9285.0 9300.0 4 9300.0 9472.0 5 9472.0 9580.0 6 9580.0 9722.0 10 9722.0 9987.0 MERGED MAIN PASS. $ Data Format Specification Record Data Record Type .................. 0 Data Specification Block Type ..... 0 Logging Direction ................. Down Optical log depth units ........... Feet Data Reference Point .............. Undefined Frame Spacing ..................... 60 .liN Max frames per record ............. Undefined Absent value ...................... -999.25 Depth Units ....................... Datum Specification Block sub-type...0 Name Service Order Units Size Nsam Rep Code Offset Channel DEPT FT 4 1 68 0 1 ROP MWD FT/H 4 1 68 4 2 GR MWD API 4 1 68 8 3 First Name Min Max Mean Nsam Reading DEPT 9198 9983.5 9590.75 1572 9198 ROP 1.04 4561.74 82.6833 1525 9221.5 GR 32.19 763.5 131.788 1515 9198 Last Reading 9983.5 9983.5 9955 First Reading For Entire File .......... 9198 Last Reading For Entire File ........... 9983.5 File Trailer Service name ............. STSLIB.001 Service Sub Level Name... Version Number ........... 1.0.0 Date of Generation ....... 98/07/02 Maximum Physical Record..65535 File Type ................ LO Next File Name ........... STSLIB.002 Physical EOF File Header Service name ............. STSLIB.002 Service Sub Level Name... Version Number ........... 1.0.0 Date of Generation ....... 98/07/02 Maximum Physical Record..65535 File Type ................ LO Previous File Name ....... STSLIB.001 Comment Record FILE HEADER FILE NUMBER: 2 RAW MWD Curves and log header data for each bit run in separate files. BIT RUN NUMBER: 1 DEPTH INCREMENT: .5000 # FILE SUMMARY VENDOR TOOL CODE START DEPTH STOP DEPTH GR 9200.0 9259.0 ROP 9225.0 9284.5 $ # LOG HEADER DATA DATE LOGGED: il-APR-98 SOFTWARE SURFACE SOFTWARE VERSION: DOWNHOLE SOFTWARE VERSION: DATA TYPE (MEMORY OR REAL-TIME): TD DRILLER (FT): TOP LOG INTERVAL (FT): BOTTOM LOG INTERVAL (FT): BIT ROTATING SPEED (RPM): HOLE INCLINATION (DEG MINIMUM ANGLE: 34.8 MAXIMUM ANGLE: 38.4 MSC 1.32 PCG 7.20 PCD 3.00 MEMORY 9285.0 9225.0 9285.0 TOOL STRING (TOP TO BOTTOM) VENDOR TOOL CODE TOOL TYPE NGP NATURAL GAMMA PROBE $ TOOL NUMBER PCG 75 BOREHOLE AND CASING DATA OPEN HOLE BIT SIZE (IN): DRILLER'S CASING DEPTH (FT): 3.800 3.8 BOREHOLE CONDITIONS MUD TYPE: MUD DENSITY (LB/G): SEA-WATER 8.50 MUD VISCOSITY (S): MUD PH: MUD CHLORIDES (PPM): FLUID LOSS (C3): RESISTIVITY (OHMM) AT TEMPERATURE (DEGF) MUD AT MEASURED TEMPERATURE (MT): MUD AT MAX CIRCULATING TERMPERATURE: MUD FILTRATE AT MT: MUD CAKE AT MT: NEUTRON TOOL MATRIX: MATRIX DENSITY: HOLE CORRECTION (IN): TOOL STANDOFF (IN) : EWR FREQUENCY (HZ): REMARKS: $ Data Format Specification Record Data Record Type .................. 0 Data Specification Block Type ..... 0 Logging Direction ................. Down Optical log depth units ........... Feet Data Reference Point .............. Undefined Frame Spacing ..................... 60 .liN Max frames per record ............. Undefined Absent value ...................... -999.25 Depth Units ....................... Datum Specification Block sub-type...0 .0 .0 0 .0 .000 .000 .000 .000 .3 Name Service Order Units Size Nsam Rep Code Offset Channel DEPT FT 4 1 68 0 1 GR MWD 1 API 4 1 68 4 2 ROP MWD 1 FT/H 4 1 68 8 3 89.1 First Name Min Max Mean Nsam Reading DEPT 9200 9284.5 9242.25 170 9200 GR 32.19 54.5 43.0703 119 9200 ROP 10.24 1398.46 42.825 120 9225 Last Reading 9284.5 9259 9284.5 First Reading For Entire File .......... 9200 Last Reading For Entire File ........... 9284.5 File Trailer Service name ............. STSLIB.002 Service Sub Level Name... Version Number ........... 1.0.0 Date of Generation ....... 98/07/02 Maximum Physical Record..65535 File Type ................ LO Next File Name ........... STSLIB.003 Physical EOF File Header Service name ............. STSLIB.003 Service Sub Level Name... Version Number ........... 1.0.0 Date of Generation ....... 98/07/02 Maximum Physical Record..65535 File Type ................ LO Previous File Name ....... STSLIB.002 Comment Record FILE HEADER FILE NUMBER: 3 RAW MWD Curves and log header data for each bit run in separate files. BIT RUN NUMBER: 2 DEPTH INCREMENT: .5000 FILE SUMMARY VENDOR TOOL CODE START DEPTH GR 9260.5 ROP 9286.5 $ # LOG HEADER DATA DATE LOGGED: SOFTWARE SURFACE SOFTWARE VERSION: DOWNHOLE SOFTWARE VERSION: DATA TYPE (MEMORY OR REAL-TIME): TD DRILLER (FT): TOP LOG INTERVAL (FT): · BOTTOM LOG INTERVAL (FT): BIT ROTATING SPEED (RPM): HOLE INCLINATION (DEG MINIMUM ANGLE: MAXIMUM ANGLE: STOP DEPTH 9275.0 9299.5 TOOL STRING (TOP TO BOTTOM) VENDOR TOOL CODE TOOL TYPE NGP NATURAL GAMMA PROBE $ BOREHOLE AND CASING DATA OPEN HOLE BIT SIZE (IN): DRILLER'S CASING DEPTH (FT): BOREHOLE CONDITIONS MUD TYPE: MUD DENSITY (LB/G): MUD VISCOSITY S): MUD PH: MUD CHLORIDES PPM): FLUID LOSS (C3 : RESISTIVITY (OHMM) AT TEMPERATURE (DEGF) MUD AT MEASURED TEMPERATURE (MT): MUD AT MAX CIRCULATING TERMPERATURE: MUD FILTRATE AT MT: MUD CAKE AT MT: 12-APR-98 MSC 1.32 PCG 7.20 PCD 3.00 MEMORY 9300.0 9285.0 9300.0 38.4 45.0 TOOL NUMBER PCG 75 3.800 3.8 SEA-WATER 8.50 .0 .0 0 .0 .000 .000 .000 .000 89.1 NEUTRON TOOL MATRIX: MATRIX DENSITY: HOLE CORRECTION (IN): TOOL STANDOFF (IN): EWR FREQUENCY (HZ): REMARKS: $ Data Format Specification Record Data Record Type .................. 0 Data Specification Block Type ..... 0 Logging Direction ................. Down Optical log depth units ........... Feet Data Reference Point .............. Undefined Frame Spacing ..................... 60 .liN Max frames per record ............. Undefined Absent value ...................... -999.25 Depth Units ....................... Datum Specification Block sub-type...0 .3 Name Service Order Units Size Nsam Rep Code Offset Channel DEPT FT 4 1 68 0 1 GR MWD 2 API 4 1 68 4 2 ROP MWD 2 FT/H 4 1 68 8 3 First Name Min Max Mean Nsam Reading DEPT 9260.5 9299.5. 9280 79 9260.5 GR 45.08 69.52 57.755 30 9260.5 ROP 1.04 69.37 20.0563 27 9286.5 Last Reading 9299.5 9275 9299.5 First Reading For Entire File .......... 9260.5 Last Reading For Entire File ........... 9299.5 File Trailer Service name ............. STSLIB.003 Service Sub Level Name... Version Number ........... 1.0.0 Date of Generation ....... 98/07/02 Maximum Physical Record..65535 File Type ................ LO Next File Name ........... STSLIB.004 Physical EOF File Header Service name ............. STSLIB.004 Service Sub Level Name... Version Number ........... 1.0.0 Date of Generation ....... 98/07/02 Maximum Physical Record..65535 File Type ................ LO Previous File Name ....... STSLIB.003 Comment Record FILE HEADER FILE NUMBER: 4 RAW MWD Curves and log header data for each bit run in separate files. BIT RUN NUMBER: 4 DEPTH INCREMENT: .5000 FILE SUMMARY VENDOR TOOL CODE START DEPTH GR 9273.0 ROP 9301.5 $ LOG HEADER DATA DATE LOGGED: SOFTWARE SURFACE SOFTWARE VERSION: DOWNHOLE SOFTWARE VERSION: DATA TYPE (MEMORY OR REAL-TIME): TD DRILLER (FT): TOP LOG INTERVAL (FT): BOTTOM LOG INTERVAL (FT): BIT ROTATING SPEED (RPM): HOLE INCLINATION (DEG MINIMUM ANGLE: MAXIMUM ANGLE: # STOP DEPTH 9444.5 9472.0 TOOL STRING (TOP TO BOTTOM) VENDOR TOOL CODE TOOL TYPE NGP NATURAL GAMMA PROBE $ BOREHOLE AND CASING DATA OPEN HOLE BIT SIZE (IN): DRILLER'S CASING DEPTH (FT): BOREHOLE CONDITIONS MUD TYPE: MUD DENSITY (LB/G): MUD VISCOSITY (S): MUD PH: MUD CHLORIDES (PPM): FLUID LOSS (C3): RESISTIVITY (OHMM) AT TEMPERATURE (DEGF) MUD AT MEASURED TEMPERATURE (MT): MUD AT MAX CIRCULATING TERMPERATURE: MUD FILTRATE AT MT: MUD CAKE AT MT: NEUTRON TOOL MATRIX: MATRIX DENSITY: HOLE CORRECTION (IN): TOOL STANDOFF (IN) : EWR FREQUENCY (HZ): 13-APR-98 MSC 1.32 PCG 7.20 PCD 3.00 MEMORY 9472.0 9300.0 9472.0 34.5 83.2 TOOL NUMBER NGP SPC 242 3.750 3.8 FLO PRO 8.80 .0 9.2 7.1 .000 .000 .000 .000 77.3 .3 DEPTH INCREMENT: .5000 FILE SUMMARY VENDOR TOOL CODE START DEPTH GR 9443.5 ROP 9473.5 $ LOG HEADER DATA DATE LOGGED: ' SOFTWARE SURFACE SOFTWARE VERSION: DOWNHOLE SOFTWARE VERSION: DATA TYPE (MEMORY OR REAL-TIME): TD DRILLER (FT): TOP LOG INTERVAL (FT): BOTTOM LOG INTERVAL (FT): BIT ROTATING SPEED (RPM): HOLE INCLINATION (DEG MINIMUM ANGLE: MAXIMUM ANGLE: STOP DEPTH 9551.5 9580.5 TOOL STRING (TOP TO BOTTOM) VENDOR TOOL CODE TOOL TYPE NGP NATURAL GAMMA PROBE $ BOREHOLE AND CASING DATA OPEN HOLE BIT SIZE (IN): DRILLER'S CASING DEPTH (FT): BOREHOLE CONDITIONS MUD TYPE: MUD DENSITY (LB/G): MUD VISCOSITY (S): MUD PH: MUD CHLORIDES (PPM): FLUID LOSS (C3): RESISTIVITY (OHMM) AT TEMPERATURE (DEGF) MUD AT MEASURED TEMPERATURE (MT): MUD AT MAX CIRCULATING TERMPERATURE: MUD FILTRATE AT MT: MUD CAKE AT MT: NEUTRON TOOL MATRIX: MATRIX DENSITY: HOLE CORRECTION (IN): TOOL STANDOFF (IN): EWR FREQUENCY (HZ): REMARKS: Data Format Specification Record Data Record Type .................. 0 Data Specification Block Type ..... 0 Logging Direction ................. Down Optical log depth units ........... Feet Data Reference Point .............. Undefined 16-APR- 98 MSC 1.32 PCG 7.20 PCD 3.00 MEMORY 9580.0 9472.0 9580.0 95.9 97.9 TOOL NUMBER PCG 75 3.750 3.8 FLO PRO 8.80 .0 9.5 6.8 .000 .000 .000 .000 70.3 .3 REMARKS: $ Data Format Specification Record Data Record Type .................. 0 Data Specification Block Type ..... 0 Logging Direction ................. Down Optical log depth units ........... Feet Data Reference Point .............. Undefined Frame Spacing ..................... 60 .liN Max frames per record ............. Undefined Absent value ...................... -999.25 Depth Units ....................... Datum Specification Block sub-type...0 Name Service Order Units Size Nsam Rep Code Offset Channel DEPT FT 4 1 68 0 1 GR MWD 4 API 4 1 68 4 2 ROP MWD 4 FT/H 4 1 68 8 3 First Name Min Max Mean Nsam Reading DEPT 9273 9472 9372.5 399 9273 GR 60.56 763.5 242.479 344 9273 ROP 13.85 41.41 22.8406 342 9301.5 Last Reading 9472 9444.5 9472 First Reading For Entire File .......... 9273 Last Reading For Entire File ........... 9472 File Trailer Service name ............. STSLIB.004 Service Sub Level Name... Version Number ........... 1.0.0 Date of Generation ....... 98/07/02 Maximum Physical Record..65535 File Type ................ LO Next File Name ........... STSLIB.005 Physical EOF File Header Service name ............. STSLIB.005 Service Sub Level Name... Version Number ........... 1.0.0 Date of Generation ....... 98/07/02 Maximum Physical Record..65535 File Type ................ LO Previous File Name ....... STSLIB.004 Comment Record FILE HEADER FILE NUMBER: 5 RAW MWD Curves and log header data for each bit run in separate files. BIT RUN NUMBER: 5 DEPTH INCREMENT: .5000 FILE SUMMARY VENDOR TOOL CODE START DEPTH GR 9443.5 ROP 9473.5 $ LOG HEADER DATA DATE LOGGED: SOFTWARE SURFACE SOFTWARE VERSION: DOWNHOLE SOFTWARE VERSION: DATA TYPE (MEMORY OR REAL-TIME): TD DRILLER (FT): TOP LOG INTERVAL (FT): BOTTOM LOG INTERVAL (FT): BIT ROTATING SPEED (RPM): HOLE INCLINATION (DEG MINIMUM ANGLE: MAXIMUM ANGLE: STOP DEPTH 9551.5 9580.5 TOOL STRING (TOP TO BOTTOM) VENDOR TOOL CODE TOOL TYPE NGP NATURAL GAMMA PROBE $ BOREHOLE AND CASING DATA OPEN HOLE BIT SIZE (IN): DRILLER'S CASING DEPTH (FT): BOREHOLE CONDITIONS MUD TYPE: MUD DENSITY (LB/G): MUD VISCOSITY (S): MUD PH: MUD CHLORIDES (PPM): FLUID LOSS (C3): RESISTIVITY (OHMM) AT TEMPERATURE (DEGF) MUD AT MEASURED TEMPERATURE (MT): MUD AT MAX CIRCULATING TERMPERATURE: MUD FILTRATE AT MT: MUD CAKE AT MT: NEUTRON TOOL MATRIX: MATRIX DENSITY: HOLE CORRECTION (IN): TOOL STANDOFF (IN): EWR FREQUENCY (HZ): REMARKS: $ Data Format Specification Record Data Record Type .................. 0 Data Specification Block Type ..... 0 Logging Direction ................. Down Optical log depth units ........... Feet Data Reference Point .............. Undefined 16-APR-98 MSC 1.32 PCG 7.20 PCD 3.00 MEMORY 9580.0 9472.0 9580.0 95.9 -97.9 TOOL NUMBER PCG 75 3.750 3.8 FLO PRO 8.80 .0 9.5 6.8 .000 .000 .000 .000 70.3 .3 Frame Spacing ..................... 60 .liN Max frames per record ............. Undefined Absent value ...................... -999.25 Depth Units ....................... Datum Specification Block sub-type...0 Name Service Order Units Size Nsam Rep Code Offset Channel DEPT FT 4 1 68 0 1 GR MWD 5 API 4 1 68 4 2 ROP MWD 5 FT/H 4 1 68 8 3 First Name Min Max Mean Nsam Reading DEPT 9443.5 9580.5 9512 275 9443.5 GR 66.48 695.03 231.321 217 9443.5 ROP 14.14 2412 119.717 215 9473.5 Last Reading 9580.5 9551.5 9580.5 First Reading For Entire File .......... 9443.5 Last Reading For Entire File ........... 9580.5 File Trailer Service name ............. STSLIB.005 Service Sub Level Name... Version Number ........... 1.0.0 Date of Generation ....... 98/07/02 Maximum Physical Record..65535 File Type ................ LO Next File Name ........... STSLIB.006 Physical EOF File Header Service name ............. STSLIB.006 Service Sub Level Name... Version Number ........... 1.0.0 Date of Generation ....... 98/07/02 Maximum Physical Record..65535 File Type ................ LO Previous File Name ....... STSLIB.005 Comment Record FILE HEADER FILE NUMBER: 6 RAW MWD Curves and log header data for each bit run in separate files. BIT RUN NUMBER: 6 DEPTH INCREMENT: .5000 FILE SUMMARY VENDOR TOOL CODE START DEPTH STOP DEPTH GR 9550.5 9693.5 ROP 9580.0 9722.0 $ LOG HEADER DATA DATE LOGGED: SOFTWARE SURFACE SOFTWARE VERSION: DOWNHOLE SOFTWARE VERSION: DATA TYPE (MEMORY OR REAL-TIME): TD DRILLER (FT): TOP LOG INTERVAL (FT): BOTTOM LOG INTERVAL (FT): BIT ROTATING SPEED (RPM): HOLE INCLINATION (DEG MINIMUM ANGLE: MAXIMUM ANGLE: TOOL STRING (TOP TO BOTTOM) VENDOR TOOL CODE TOOL TYPE NGP NATURAL GAMMA PROBE $ BOREHOLE AND CASING DATA OPEN HOLE BIT SIZE (IN): DRILLER'S CASING DEPTH (FT): BOREHOLE CONDITIONS MUD TYPE: MUD DENSITY (LB/G): MUD VISCOSITY (S): MUD PH: MUD CHLORIDES (PPM): FLUID LOSS (C3): RESISTIVITY (OHMM) AT TEMPERATURE (DEGF) MUD AT MEASURED TEMPERATURE (MT): MUD AT MAX CIRCULATING TERMPERATURE: MUD FILTRATE AT MT: MUD CAKE AT MT: NEUTRON TOOL MATRIX: MATRIX DENSITY: HOLE CORRECTION (IN): TOOL STANDOFF (IN): EWR FREQUENCY (HZ): REMARKS: $ Data Format Specification Record Data Record Type .................. 0 Data Specification Block Type ..... 0 Logging Direction ................. Down Optical log depth units ........... Feet Data Reference Point .............. Undefined Frame Spacing ..................... 60 .liN Max frames per record ............. Undefined Absent value ...................... -999.25 Depth Units ....................... Datum Specification Block sub-type...0 17-APR-98 MSC 1.32 PCG 7.20 PCD 3.00 MEMORY 9722.0 9580.0 9722.0 89.1 94.5 TOOL NUMBER PCG 75 3.750 3.8 SEA-WATER 8.50 .0 .0 9000 .0 .000 .000 .000 .000 50.2 .3 Name Service Order Units Size Nsam Rep Code Offset Channel DEPT FT 4 1 68 0 1 GR MWD 6 API 4 1 68 4 2 ROP MWD 6 FT/H 4 1 68 8 3 Name Min Max Mean Nsam DEPT 9550.5 9722 9636.25 344 GR 41.06 127.41 79.8909 287 ROP 12.29 987.8 29.8243 285 First Last Reading Reading 9550.5 9722 9550.5 9693.5 9580 9722 First Reading For Entire File .......... 9550.5 Last Reading For Entire File ........... 9722 File Trailer Service name ............. STSLIB.006 Service Sub Level Name... Version Number ........... 1.0.0 Date of Generation ....... 98/07/02 Maximum Physical Record..65535 File Type ................ LO Next File Name ........... STSLIB.007 Physical EOF File Header Service name ............. STSLIB.007 Service Sub Level Name... Version Number ........... 1.0.0 Date of Generation ....... 98/07/02 Maximum Physical Record..65535 File Type ................ LO Previous File Name ....... STSLIB.006 Comment Record FILE HEADER FILE NUMBER: 7 RAW MWD Curves and log header data for each'bit run in separate files. BIT RUN NUMBER: 10 DEPTH INCREMENT: .5000 # FILE SUMMARY VENDOR TOOL CODE START DEPTH STOP DEPTH GR 9699.0 9958.5 ROP 9720.0 9987.0 $ LOG HEADER DATA DATE LOGGED: 18-APR-98 SOFTWARE SURFACE SOFTWARE VERSION: DOWNHOLE SOFTWARE VERSION: DATA TYPE (MEMORY OR REAL-TIME): TD DRILLER (FT): TOP LOG INTERVAL (FT): BOTTOM LOG INTERVAL (FT): BIT ROTATING SPEED (RPM): MSC 1.32 PCG 7.20 PCD 3.00 MEMORY 9987.0 9722.0 9987.0 HOLE INCLINATION (DEG MINIMUM ANGLE: MAXIMUM ANGLE: TOOL STRING (TOP TO BOTTOM) VENDOR TOOL CODE TOOL TYPE NGP NATURAL GAMMA PROBE $ BOREHOLE AND CASING DATA OPEN HOLE BIT SIZE {IN): DRILLER'S CASING DEPTH (FT): BOREHOLE CONDITIONS MUD TYPE: MUD DENSITY (LB/G): MUD VISCOSITY (S): MUD PH: MUD CHLORIDES (PPM): FLUID LOSS (C3): RESISTIVITY (OHMM) AT TEMPERATURE (DEGF) MUD AT MEASURED TEMPERATURE (MT): MUD AT MAX CIRCULATING TERMPERATURE: MUD FILTRATE AT MT: MUD CAKE AT MT: NEUTRON TOOL MATRIX: MATRIX DENSITY: HOLE CORRECTION (IN): TOOL STANDOFF (IN): EWR FREQUENCY (HZ): REMARKS: $ # Data Format Specification Record Data Record Type .................. 0 Data Specification Block Type ..... 0 Logging Direction ................. Down Optical log depth units ........... Feet Data Reference Point .............. Undefined Frame Spacing ..................... 60 .liN Max frames per record ............. Undefined A2Dsent value ...................... -999.25 Depth Units ....................... Datum Specification Block sub-type...0 87.5 92.6 TOOL NUMBER PCG 75 3.750 3.8 SEA-WATER 8.50 .0 .0 9000 .0 .000 .000 .000 .000 51.6 .3 Name Service Order Units Size Nsam Rep Code Offset Channel DEPT FT 4 1 68 0 1 GR MWD 10 API 4 1 68 4 2 ROP MWD 10 FT/H 4 1 68 8 3 First Name Min Max Mean Nsam Reading DEPT 9699 9987 9843 577 9699 GR 34.28 330.04 72.9296 520 9699 ROP 14.08 4590.04 191.569 535 9720 Last Reading 9987 9958.5 9987 First Reading For Entire File .......... 9699 Last Reading For Entire File ........... 9987 File Trailer Service name ............. STSLIB.007 Service Sub Level Name... Version Number ........... 1.0.0 Date of Generation ....... 98/07/02 Maximum Physical Record..65535 File Type ................ LO Next File Name ........... STSLIB.008 Physical EOF Tape Trailer Service name ............. LISTPE Date ..................... 98/07/02 Origin ................... STS Tape Name ................ UNKNOWN Continuation Number ...... 01 Next Tape Name ........... UNKNOWN Comments ................. STS LIS Writing Library. Technical Services Reel Trailer Service name ............. LISTPE Date ..................... 98/07/02 Origin ................... STS Reel Name ................ UNKNOWN Continuation Number ...... 01 Next Reel Name ........... UNKNOWN Comments ................. STS LIS Writing Library. Technical Services Scientific Scientific Physical EOF Physical EOF End Of LIS File