Department of Commerce, Community, and Economic Development
Alaska Oil and Gas Conservation
Commission
HOME
EVENTS
DATA
Data List
Drilling
Production
Orders
Data Miner
Document Search
REPORTS
Reports and Charts
Pool Statistics
FORMS
LINKS
Links
Test Notification
Data Requests
Regulations
Industry Guidance Bulletins
How to Apply
ABOUT US
History
Staff
HELP
Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
198-006
STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMMIS WELL COMPLETION OR RECOMPLETION REPOKAND LOG la. Well Status: Oil 0 Gas 0 SPLUG 0 Other ❑ Abandoned ® ' Suspended 0 1b.Well Class: 20AAC 25.105 20AAC 25.110 Development m Exploratory 0 GINJ 0 WINJ 0 WAG 0 WDSPL 0 No.of Completions: Zero Service 0 Stratigraphic Test 0 2. Operator Name: 6. Date Comp.,Susp.,or Aband.: 14.Permit to Drill Number/Sundry BP Exploration(Alaska),Inc 4/20/2017• 198-006 • 316-611 3. Address: 7. Date Spudded: 15' API Number: P.O.Box 196612 Anchorage,AK 99519-6612 2/16/1998 ' 50-029-21015-01-00 • 4a. Location of Well(Governmental Section): 8. Date TD Reached: 16. Well Name and Number: 2/21/1998 PBU 03-24A • Surface: 644'FSL,522'FEL,Sec.10,T1ON,R15E,UM • 9 Ref Elevations KB 62 - 17. Field/Pool(s): Top of Productive Interval: 488'FSL,4009'FEL,Sec.09,T1ON,R15E,UM GL 27.72 • BF 29.77 • PRUDHOE BAY,PRUDHOE OIL• Total Depth: 159'FSL,4073'FEL,Sec.09,T1ON,R15E,UM 10. Plug Back Depth(MD/TVD): 18. Property Designation: 12978'/8718' • ADL 028328 • 4b. 4b.Location of Well(State Base Plane Coordinates,NAD 27): 11. Total Depth(MD/TVD): 19. Land Use Permit: Surface:x- 712759. y- 5936689• Zone - ASP 4 . 13531'/9062'• 74-017 TPI: x- 704001 y- 5936271 Zone - ASP 4 12. SSSV Depth(MD/TVD): 20 Thickness of Permafrost MD/TVD: Total Depth:x- 703946 y- 5935941 Zone - ASP 4 None 1900'(Approx.) 5. Directional or Inclination Survey: Yes 0 (attached) No II 13. Water Depth,if Offshore: 21. Re-drill/Lateral Top Window MD/TVD: Submit electronic and printed information per 20 AAC 25.050 N/A (ft MSL) . 12806'/8667' • 22. Logs Obtained List all logs run and,pursuant to AS 31.05.030 and 20 AAC 25.071,submit all electronic data and printed logs within 90 days of completion, suspension,or abandonment,whichever occurs first.Types of logs to be listed include,but are not limited to:mud log,spontaneous potential,gamma ray,caliper, resistivity,porosity,magnetic resonance,dipmeter,formation tester,temperature,cement evaluation,casing collar locator,jewelry,and perforation record. Acronyms may be used.Attach a separate page if necessary WINE r/ `-' MWD,GR s KED WIIA' 2 5 4 ., 23. CASING,LINER AND CEMENTING RECORD CASING WT,PER GRADE SETTING DEPTH MD SETTING DEPTH ND HOLE SIZE CEMENTING RECORDAMOUNT FT. PULLED TOP BOTTOM TOP BOTTOM 20" 91.5# H-40 35' 115' 35' 115' 30" 1937#Poleset 13-3/8" 72# L-80 35' 2640' 35' 2548' 17-1/2" 3600 sx CS III,550 sx Cs II 9-5/8" 47# L-80 32' 12786' 32' 8654' 12-1/4" 500 sx Class'G',250 sx CS I 7" 29# L-80 12492' 12806' 8453' 8667' 8-1/2" 327 sx Class'G' 3-3/16" 6.2# L40 12898' 13531' 8711' 9062' 3-3/4" 73 sx Class'G' 24. Open to production or injection? Yes 0 No RI 25. TUBING RECORD If Yes,list each interval open(MD/TVD of Top and Bottom;Perforation GRADE DEPTH SET(MD) PACKER SET(MD/TV Size and Number): 5-1/2"17#13Cr80 12266' 12146'/8220' 4-1/2"12.6#13Cr80 12314'-12516' 12372'/8371' posxwoowelo 26. ACID,FRACTURE,CEMENT SQUEEZE,ETC. IA r*r RECEIVED Was hydraulic fracturing used during completion? Yes ❑ No 0 . LI �20 Its- Per 20 AAC 25.283(i)(2)attach electronic and printed information q_,,,,,,, MAY 0 9 2017 DEPTH INTERVAL(MD) AMOUNT AND KIND OF MATERIAL USED ��� 12798' Set Whipstock C12798' 143 Bbls Class'G' 27. PRODUCTION TEST Date First Production: Not on Production Method of Operation(Flowing,gas lift,etc.):N/A Date of Test: Hours Tested: Production for Oil-Bbl: Gas-MCF: Water-Bbl: Choke Size: Gas-Oil Ratio: Test Period w►. Flow Tubing Casing Press: Calculated Oil-Bbl: Gas-MCF: Water-Bbl: Oil Gravity-API(torr): Press 24 Hour Rate •"".. Form 10-407 Revised 11/2015 CONTINUED ON PAGE 2 Submit ORIGINAL only ki.7 S/l C/17- "007 RBDMS 1,t, MAY 1 5 2017 A. S-zz,r7 �' • 28. CORE DATA Conventional Core(s) Yes ❑ No 0 • Sidewall Cores Yes 0 No I If Yes to either question,list formations and intervals cored(MD+TVD of top and bottom of each),and summarize lithology and presence of oil,gas or water (submit separate sheets with this form,if needed).Submit detailed descriptions,core chips,photographs and laboratory analytical results per 20 AAC 25.071. 29. GEOLOGIC MARKERS(List all formations and markers encountered): 30. FORMATION TESTS NAME MD TVD Permafrost-Top Well Tested? Yes 0 No 0 Permafrost-Base If yes,list intervals and formations tested,briefly summarizing test results.Attach Top of Productive Interval 13068' 8746' separate sheets to this form,if needed,and submit detailed test information per 20 AAC 25.071. Sadlerochit 13068' 8746' Formation at total depth: Sadlerochit 13068' 8746' 31. List of Attachments: Summary of Pre-Rig Work,Summary of Daily Drilling Reports,Wellbore Schematic Diagram Information to be attached includes,but is not limited to:summary of daily operations,wellbore schematic,directional or inclination survey,core analysis,paleontological report,production or well test results,per 20 AAC 25.070. 32.I hereby certify that the foregoing is true and correct to the best of my knowledge. Contact: Ciolkosz,Ryan R Email: Ryan.Ciolkosz@bp.com Printed Name: Joe Lastu Title: Drilling Technologist Signature: Phone: +1 907 564 4091 Date: 5/9 hi INSTRUCTIONS General:This form is designed for submitting a complete and correct well completion report and log on all types of lands and leases in Alaska.Submit a well schematic diagram with each 10-407 well completion report and 10-404 well sundry report when the downhole well design is changed. All laboratory analytical reports regarding samples or tests from a well must be submitted to the AOGCC,no matter when the analyses are conducted. Item la. Multiple completion is defined as a well producing from more than one pool with production from each pool completely segregated.Each segregated pool is a completion. Item 1 b.Well Class Service wells:Gas Injection,Water Injection,Water-Alternating-Gas Injection,Salt Water Disp,Water Supply for Injection,Observation or Other. Item 4b.TPI(Top of Producing Interval). Item 9. The Kelly Bushing and Ground Level elevations in feet above mean sea level.Use same as reference for depth measurements given in other spaces on this form and in any attachments. Item 15.The API number reported to AOGCC must be 14 digits(ex:50-029-20123-00-00). Item 20.Report true vertical thickness of permafrost in Box 20.Provide MD and TVD for the top and base of permafrost in Box 29. Item 22.Review the reporting requirements of 20 AAC 25.071 and,pursuant to AS 31.05.030,submit all electronic data and printed logs within 90 days of completion,suspension,or abandonment,whichever occurs first. Item 23.Attached supplemental records should show the details of any multiple stage cementing and the location of the cementing tool. Item 24.If this well is completed for separate production from more than one interval(multiple completion),so state in item 1,and in item 23 show the producing intervals for only the interval reported in item 26.(Submit a separate form for each additional interval to be separately produced, showing the data pertinent to such interval). Item 27.Method of Operation:Flowing,Gas Lift,Rod Pump,Hydraulic Pump,Submersible,Water Injection,Gas Injection,Shut-in,or Other(explain). Item 28.Provide a listing of intervals cored and the corresponding formations,and a brief description in this box.Submit detailed description and analytical laboratory information required by 20 AAC 25.071. Item 30.Provide a listing of intervals tested and the corresponding formation,and a brief summary in this box.Submit detailed test and analytical laboratory information required by 20 AAC 25.071. Item 31.Pursuant to 20 AAC 25.070,attach to this form:well schematic diagram,summary of daily well operations,directional or inclination survey,and other tests as required including,but not limited to:core analysis,paleontological report,production or well test results. Form 10-407 Revised 11/2015 Submit ORIGINAL Only • • Daily Report of Well Operations 03-24A ACTIVITYDATE SUMMARY ***WELL S/I ON ARRIVAL***(SLB E-LINE UNIT 2362 -SET WHIPSTOCK) INITIAL T/I/O = 2400/850/300 PSI RUN1: RU/PT ELINE. RIH W/3.5" DRIFT. OAL=22'/OAW=260#/ MAXOD=3.5". TAGGED @ 12818'. RUN2: RIH W/GR/CCL/4.5 x 7" BAKER DELTA WHIPSTOCK. OAL = 58'/OAW = 680#/ MAX OD = 3.625". 1/27/2017 ***JOB CONTINUED 28-JAN-2017*** ***JOB CONTINUED FROM 27-JAN-2017***(SLB ELINE UNIT 2362 - SET WHIPSTOCK) CONTINUE RIH WITH WHIPSTOCK TOOLSTRING. SET TOWS AT 12795'; CCL TO TOWS = 14.1'; CCL STOP DEPTH = 12780.9'. AFTER SETTING TELEMETRY WAS LOST. TAGGED WHIPSTOCK AND SAT DOWN APPROX 100 LBS TENSION TO CONFIRM SET. LOGS TIED IN TO SLB CEMENT EVALUATION LOG DATED 6-JUL-1987. POOH. FINAL T/I/O = 2360/750/300. WELL SECURE. PAD OP NOTIFIED. ***JOB COMPLETE 28-JAN-2017*** 1/28/2017 CTU#14 1.75" CT [Job Scope: Cement Whipstock] MIRU CTU. MU & RIH w/2.50" BDJSN. Bullhead 462 bbls of 1% KCL and 284bb1 of diesel. Baseline injection = 1 bpm @ 428psi. Attempt first 30bbl cement job and did not achieve even close to a bump. Hesitated to the 4.5 hour mark (6.5 hour thickening time). No luck getting any bump in pressure. Contaminated remaining cement with 20bbl of powervis and flush into formation. Discuss with town intervention engineer, decision to repeat 30bbl, but to make next pump schedule, 5 neat, 10 w/8lbs/bbl aggregate, and 15bbl of neat cement. Same results as first attempt, no bump achieve. Laid in 9.3 bbls & perform hesitation squeeze. Unable to get a bump in pressure. Drop ball &contaminate/flush cement from WCTOC to flag. Pooh. Freeze Protect Coil. 2/5/2017 ***In Progress*** CTU#14 1.75" CT [Job Scope: Cement Whipstock] Finish Pooh. Recover 5/8" ball. Rig Down CTU. 2/6/2017 ***Job Incomplete/Will return at later date for another Squeeze*** (LRS Unit 42 -Assist CT: Heat Uprights) 2/7/2017 Circ/Heat Uprights#001 & 064 to 140*f T/I/O = SSV/250/330. Temp = SI. IA FL. (Eval T x IA Communication). ALP = 1880 psi & SI @ IA casing valve. IA FL @ 90', (4 bbl). Unable to get TBG pressure, HYD panel disconnected, do not have the fittings to connect to SSV. 2/18/2017 SV, WV, SSV= C. MV= O. IA, OA= OTG. 04:55 T/I/O = 680/230/330. Temp = SI. TIFL *PASSED*(Eval TxIA). AL SI @ CV, ALP = 1900 psi. TBG FL @ 890' (21 bbls) IA FL @ 90' (4 bbls). Used AL to increase TP from 680 psi to 1380 psi in 1 hr. TFL fell to 2130' (50 bbls), . IAP & IA FL unchanged. Monitor for 1 hr. TP decreased 60 psi, IAP and IA FL unchanged. Final WHPs = 1320/230/330. 2/18/2017 SV, SSV, WV= C. MV= O. IA, OA= OTG. CTU 14 w/ 1.75" CT Job Scope: Crystal Seal and Cement Whipstock MIRU. Pump drift ball. Begin weekly BOP test. MU and RIH with 2.5" JSN. Counter failing. POOH to surface to troubleshoot. Remove ice from counter chains. RIH with 2.5" JSN. Pump 5 bbls of 60/40 meth down BS, followed by 290 bbls of safelube and 10 bbls of 60/40 meth. Tag WS @ 12776' CTD, PU 18' and paint green flag @ 12748.6'. (Brand new CT, so we PU more). 3/1/2017 ***Job Continued on 3/2/17*** • i Daily Report of Well Operations 03-24A CTU 14 w/ 1.75" CT CV=33bb1 ***Continued from 3/1/2017*** Job Scope: Crystal Seal and Cement Whipstock Continue POOH with 2.5" nozzle BHA. LD 2.5" nozzle and MU slim 1.75" BDJSN BHA, OAL:10.96', RIH. RIH to 12150. Pump 277bb1 of diesel with 776. Load reel with 3% KCI and perform baseline injectivity test. Injectivity at 1 bpm @ 444psi. Pumped 61 bbl of.1 ppg crystal seal, followed by 38bb1 of.15ppg, and 187bb1 of.2ppg. All the while pumping .3bpm diesel down the CTBS. Final injection 714psi at 1 bpm. Displace and freeze protect coil. Allow 90 minute hydration time. POOH prior to injection test due to imminent phase 3. 3/2/2017 ***Job in Progress*** CTU 14 w/ 1.75" CT CV=33bb1 Job Scope: Post Crystal Seal Inj. Test and Cement Whipstock Snow removal after extended Phase 2 conditions, Lower and inspect injector. MIRU HES Cementers. MU & RIH w/2.5" BDJSN. Confirm hole is liquid packed. Conduct injectivity test. 525psi at 1 bpm pumping 27 bbls of diesel. ( Post Crystal Seal Injectivity 714psi at 1 bpm). Does not appear Crystal Seal is doing much, discuss with Int Eng. Tag WS pinch point at 12778'. Pick up 10'. Static baseline pressure = -150psi. Pump 11 bbls 15.8ppg Class G Cement. Sqz 1 bbl below whipstock. Open choke & let 2 bbls up around nozzle & lay in 1:1. Close choke & pump pipe displacement up to safety at 12200'. Perform Hesitation Sqz. So far unable to build any sqeeze pressure. 3/4/2017 ***Job in Progress*** CTU#14 1.75" CT Job Scope: Post Crystal Seal lnj Test/Cement Whipstock Continue hesitation squeeze. Unable to build any squeeze pressure. Hesitate to within 1/3 of thickening time remaining. Displace cement 2 bbls below whipstock depth of 12800' per Int Eng. Pooh while pumping pipe displacement. At surface pump gel sweep to tanks. FP Coil w/60/40 meth. Trim pipe for chrome mgnmt. RIH with 2.5" BDJSN BHA. Circ well over to diesel w/776. Perform injectivity test down the coil at 1bpm, WHP =450psi. Tag Whipstock pinch point at 12798'. Shift depth to 12800'. Puh 10'. Pump 72 bbls HES 15.8ppg Class G Cement. After 35 bbls behind pipe, started to build a bump pressure. Pump 52 bbls behind pipe & reach a -680psi bump. Lay in 16.8 bbls getting 1:1 returns. Puh to safety. Attempt to build up to squeeze pressure, well went back to drinking cement. Perform Hesitation Squeeze. Thus far 62.1 bbls behind pipe attempting to reach 1500psi of squeeze pressure. 6.7 bbls of cement still remaining above whipstock. 3/5/2017 ***In Progress*** CTU#14 1.75" CT Job Scope: Post Crystal Seal lnj Test/Cement Whipstock With 6.7 bbls of cement remaining above whipstock attempt to reach squeeze pressure. Finally able to build up to 1109psi, highest pressure reached (- 950psi over baseline static pressure of 160psi). -62.5 bbls behind pipe. Hold for- 15 mins due to cement thickening time. Slowly bleed down to -400psi. Attempt to load 5/8" ball but have ice in hardline. Without dropping ball contaminate cement down to the whipstock. Tag high at 12787' down / 12780' up. Not getting any deeper, appears we are -20' above our initial tag hitting cement. Both electronic& mechanical counters are 20' high. Tag with 75 mins remaining on thickening time. After first up pass, launch 5/8" steel ball. Make down/up/down pass from WCTOC to whipstock or top of cement. Chase ooh 80%. Jet jewelry& 9-5/8" section of liner. Lay in 60/40 Meth Freeze Protect. Jet tree & bop's. Discuss job results with Drill Eng, receive approval to rig down CTU. *******Final TOC - 12780'.********** 3/6/2017 ***Job Complete*** • • Daily Report of Well Operations 03-24A T/I/O= 0/160/340 Temp= S/I (LRS Unit 46 - MIT-T Post Cemented Whipstock) MITT**FAILED**to 2750 psi. (See log) Pumped 18 bbls of DSL down TBG, ran out of fluid. Diesel transport on location. Perform LLR with a total of 45 bbls of diesel. 1 bpm= 0 psi for 5 mins. 3 bpm = 1106 psi. 5 bpm =2189 psi. 63 total bbls of dsl pumped. (See recorded data to to FB coordinator) **MITT tag hung on MV** 3/9/2017 FWHP=480/262/335 T/I/O=VAC/200/350. RU CIW lubricator w/5" H-TWC #DSM 02 . Performed lubricator test and ran down polish rod , tagging @115" . PT'd against the TWC to 3500 psi (PASSED) . RDMO***Job Complete*** SEE LOG FOR DETAILS. Final T/I/O= 3/12/2017 TWC/200/350. Note: Hung TWC sign on MV. T/I/O= TWC/400/300. Removed FMC 5" SSV and piggybacked the WV with 5" FMC TEMP#37 . 7"x 3" XO#03 installed on piggybacked valves. Torqued and PT'd tree to 3/17/2017 API specs. RDMO***Job Complete***. SEE LOG FOR DETAILS. Final T/I/O= T/I/O = TWC/200/320. Temp = SI. Bleed IAP & OAP. (Pre-Rig). WH, flow line & scaffold removed, dry hole tree installed. IA FL @ 582' (26 bbl), OA FL @ 102' (6 bbl). Continued 3/18/2017 on WSR 3-19-17. T/I/O=TWC/200/300. Pre CDR2 IA Replacement. Set 3" FMC VR plug, Replaced working 3" FMC 75 with new FMC 120 (tag #9) PT to 3500 psi. Pass. Pull 3"VR FMC plug. PT blind to 3/18/2017 2500 psi. Pass. ***Job Complete*** See log. Final WHP's TWC/200/300. T/I/O = TWC/10/10. Temp= SI. WHP's. (Pre-Rig). WH/scaffold, flow line removed, dry hole tree installed. IAP increased 10 psi, OAP increased 10 psi overnight. 3/19/2017 SV, WV= C. MV= O. IA, OA= OTG. 20:00 Continued from WSR 3-18-17. T/I/O = TWC/40/320. Temp = SI. Bleed IAP & OAP. (Pre-Rig). WH, flow line &scaffold removed, dry hole tree installed. IA FL @ 582' (26 bbl), OA FL @ 102' (6 bbl). Bled IAP from 200 psi to 0 psi in 1 hour 15 minutes (all gas). Bled OAP from 320 psi to 0 psi in 2 hours. Rig down & monitor for 1 hour. No change in WHP's during 1 hour monitor. Final WHP's =TWC/0+/0+. SV, WV= C. MV= O. IA, OA= OTG. 04:15 3/19/2017 T/I/O = TWC/70/20. Temp = SI. WHP's (Pre-Rig). Well is demobed for rig. IAP increased 60 psi, OAP increased 10 psi from 3/19/17. Replaced transmitting gauges with standard 3k gauges. Left transmitting gauges in control room. 3/28/2017 SV, WV= C. MV= O. IA, OA= OTG. 03:30. T/I/O = TWC/95/15. Temp = SI. Bleed WHPs to 0 psi (Pre-Rig). Well is demobed for rig. IA FL @ 582' (26 bbls), OA FL @ 102' (6 bbls). Bled IAP from 95 psi to 0 psi (all gas) in 1 hr and bled OAP from 15 psi to 0 psi in 30 min (all gas). Monitored for 30 min, IAP and OAP increased 5 psi. Final WHPs = TWC/5/5. 4/10/2017 SV, WV= C. MV= O. IA, OA= OTG. 14:00 hrs. • • North America-ALASKA-BP Page 1 CO Operation Summary Report Common Well Name:03-24 AFE No Event Type:RE-ENTER-ONSHORE(RON) Start Date:4/12/2017 End Date:4/25/2017 X3-01871-C:(2,199,128.00) Project:Prudhoe Bay Site:PB DS 03 Rig Name/No.:CDR-2 Spud Date/Time:9/21/1983 12:00:00AM Rig Release:4/28/2017 Rig Contractor:NABORS ALASKA DRILLING INC. BPUOI:USA00001401 Active datum:Original KBE @62.00usft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (usft) 4/12/2017 17:00 - 00:00 7.00 MOB P PRE RELEASED RIG OFF DS03-22 AT 17:00 FINISH RIGGING DOWN. PREPARING TO MOVE OFF WELL I PJSM FOR MOVING OFF WELL PULL RIG OFF WELL. STAGE SUBS MOVE MATS OVER. VERIFY PRESSURE AND ALL VALVES CLOSED MOVE OVER AT SET RIG DOWN. START RIGGING EVERYTHING UP 4/13/2017 00:00 - 01:30 1.50 MOB P PRE CONTINUE MAKING UP MODULES. PERFORM RIG UP CHECKLIST -RIG ACCEPT AT 01:30 HOURS 01:30 - 06:00 4.50 MOB P PRE PJSM, REVIEW PRESSURE CROSSCHECK. PERFORM LTT BETWEEN MASTER/SWAB TO 3500# NO VISUAL LEAKS RIG UP MPD LINE. 06:00 - 07:30 1.50 RIGU P PRE COMPLETE RIGGING UP MPD LINE TO TREE VALVES T1 AND T2 -SENSORS AND GAUGE ON TREE TO MONITOR IA/OA/WING VALVE 07:30 - 11:00 3.50 BOPSUR P PRE 1 NU BOP -NIPPLED UP,RECORD RKB HEIGHTS -COMPLETE RIGGING UP LINES,SPACE OUT TEST JOINT AND MARK 11:00 - 13:00 2.00 RIGU P PRE CALLOUT DAY CREW 30 MINUTES EARLY, 'CONDUCT PRE-SPUD WITH BOTH CREWS. -CONDUCT H2S RIG EVACUATION DRILL WITH BOTH CREWS. ALARMS COME OVER RIG SPEAKERS THROUGH GAITRONICS. VERY DISCERNIBLE ALARM. -PERSONNEL FOLLOW STATION ORDERS, DRILLER AND LEAD FLOORHAND SECURE WELL. PERSONNEL MUSTER,TO INCLUDE SIMOPS PERSONNEL ON LOCATION. AAR TO DISCUSS EVAC. GOOD CREW RESPONSE ALL AROUND. COMMIT TO SITE CONTROL TAKING OVER CONTROL OF BUMP/ CALIBRATION MANAGEMENT OF PERSONAL MONITORS. -BRING DAY CREW BACK TO CONFERENCE ROOM,CONDUCT PRE-TOUR MEETING WITH EMPHASIS ON TESTING BOP AND PRESSURE /FLUID MANAGEMENT 13:00 - 15:30 2.50 BOPSUR P PRE FLOOD WITH FRESH WATER TO PREPARE FOR TESTING !-CONDUCT PJSM ON BOP TEST,DOUBLE CHECKING ALIGNMENT,EXPECTED PRESSURES AND WHERE TATTLE-TALES ARE -CONDUCT BODY TEST,GOOD TEST -ATTEMPT FIRST TEST AGAINST THE T1-T2 VALVES ON THE MANAGED PRESSURE LINE (WING VALVE)AND KEEP HAVING BLEEDS. TROUBLESHOOT,ALL TATTLE-TALES GOOD. CYCLE MASTER,ATTEMPT TEST. NO GO. OPEN MASTER,TEST AGAINST TWC AND GET GOOD TEST. Printed 5/8/2017 4.56.37PM *AII depths reported in Drillers Depths` • North America-ALASKA-BP • Page 26£11t-- Operation 6Dtt—Operation Summary Report Common Well Name:03-24 I AFE No Event Type:RE-ENTER-ONSHORE(RON) Start Date:4/12/2017 End Date:4/25/2017 X3-01871-C:(2,199,128.00) Project:Prudhoe Bay Site:PB DS 03 Rig Name/No.:CDR-2 Spud Date/Time:9/21/1983 12:00:00AM Rig Release:4/28/2017 Rig Contractor:NABORSALASKA DRILLING INC. BPUOI:USA00001401 Active datum:Original KBE @62.O0usft(above Mean Sea Level) Date 1 From-To 11 Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (usft) 15:30 00:00 8.50 BOPSUR P PRE TEST BOPE TO 250 PSI LOW,3500 PSI HIGH FOR 5 MINUTES EACH -TEST WITH 2-3/8"AND 3-1/2"TEST JOINTS -ALL TESTS CHARTED ON CHART RECORDER -TEST WITNESS WAIVED BYAOGCC REP BRIAN BIXBY -TEST GAS ALARMS -5K STACK BOP COMPONENTS CONSIST OF FROM TOP DOWN:ANNULAR,BLIND SHEAR, 2-3/8"PIPE SLIP RAMS,MUD CROSS WITH CHOKE/KILL HCR,2-3/8"BY 3-1/2"VARIABLE 1 RAMS,2-3/8"PIPE SLIP RAMS -CONDUCT ACCUMULATOR DRAWDOWN TEST,FUNCTION BOP COMPONENTS FROM 'BOTH DRILLERS CONSOLE AND REMOTE CONSOLE -PERFORMED TESTS ON BOTH SETS OF 2-3/8"PIPE RAMS, 2-3/8"X 3-1/2"VARIABLES :ON RAM LOCKS WITH HYDRAULIC PRESSURE BLED OFF. GOOD TEST. 4/14/2017 00:00 - 01:00 1.00 BOPSUR P PRE 'FINISH BLIND RAM TEST ON RAM LOCKS WITH HYDRAULIC PRESSURE BLED OFF 01:00 - 08:00 7.00 BOPSUR P PRE TIE INTO PRESSURE TEST C9&C10 FROM BACKSIDE. TROUBLESHOOT LEAK PATH -VALVE ALIGNMENT TO CHOKE-B NOT MEETING PRESSURE TEST CRITERIA. SERVICE AND CYCLE VALVES OFF OF CRITICAL PATH WHILE CREW STABS ON AND FILLS COIL. -VALVE CREW TORQUE TREE-ALL BOLTS GOOD,TORQUED TO SPEC. INSPECT AND CHANGE OUT PACKOFFS WHILE TREE BEING TORQUED -LINE UP TO TEST INNER REEL VALVE AND PACKOFFS. NOT MEETING TEST CRITERIA. TROUBLESHOOT,INNER REEL IRON VALVE FAILED. 08:00 - 09:00 1.00 BOPSUR N SFAL PRE NOTIFIED OF EMERGENCY ACTIONS REQUIRING IMT INVOLVEMENT AT DS 2-3. SECURITY HAS CALLED CODE RED,RIG ORDERED TO GET TO SAFE PLACE AND WAIT ON ORDERS. -PROCEED WITH REPLACING INNER REEL VALVE AND PRESSURE TEST PER PLAN -SIMOPS:OFFLOAD KCL FROM TRUCKS INTO PITS IN ORDER TO RELEASE TRUCKING TO IMT 09:00 - 10:00 1.00 BOPSUR N SFAL PRE IRV IS REPLACED. FLUID PACK,TEST INNER REEL VALVE TO 250 PSI LOW,3500 PSI HIGH. GOOD TEST. -POP OFF AFTER GOOD INNER REEL VALVE TEST. 10:00 - 13:30 3.50 BOPSUR N SFAL PRE CONTINUE WITH WORK ON CHOKE MANIFOLD COMPONENTS FOR TESTING C9 AND C10 -SIMOPS:INSTALL CHECKS INTO BHI UPPER QUICK CONNECT Printed 5/8/2017 4.56.37PM 'All depths reported in Drillers Depths* • 4110 North America-ALASKA-BP Page 3 et011:3 Operation Summary Report Common Well Name:03-24 AFE No Event Type:RE-ENTER-ONSHORE(RON) 1Start Date:4/12/2017 End Date:4/25/2017 X3-01871-C:(2,199,128.00) 11 Project:Prudhoe Bay Site:PB DS 03 Rig Name/No.:CDR-2 Spud Date/Time:9/21/1983 12:00:00AM Rig Release:4/28/2017 Rig Contractor:NABORS ALASKA DRILLING INC. BPUOI:USA00001401 Active datum:Original KBE @62.O0usft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (usft) 113:30 - 20:00 , 6.50 BOPSUR P PRE TEST BHI CHECK VALVES TO 250 PSI LOW, 4500 PSI HIGH-GOOD TEST. -STAB ON,CIRCULATE ACROSS TOP OF TWC WITH NOZZLE ASSEMBLY AT HIGH RATE TO CLEAN RETRIEVAL AREA OF TWC(DSM CREW STATED THAT 5-1/2"H-PROFILE TWC IS UNIQUE AND HAS HISTORY OF BEING PROBLEMATIC TO RETRIEVE IF ANY DEBRIS AT ALL IS ON IT). -CLEAN OUT STACK OF WATER,RU I LUBRICATOR,FILL STACK AND FLUID PACK LUBRICATOR WITH METHANOL. PRESSURE TEST TO 250 PSI LOW/3500 PSI HIGH. PULL TWC WITH WELL ON VACUUM. LET WELL EVACUATE FLUID OUT OF STACK. ;-WELL SECURED WITH CLOSING OF MASTER AND SWAB VALVES, INSTALL NIGHT CAP. -OFFLOAD VALVE CREW LUBRICATOR 20:00 - 00:00 4.00 BOPSUR N SFAL PRE CHANGE OUT VALVES 12,13,AND 14. PRESSURE TEST CHOKE VALVES 9 AND 10 4/15/2017 00:00 - 06:00 6.00 BOPSUR N SFAL PRE CONTINUE WAITING ON ORDERS DUE TO INCIDENT ON DS02-03 WORKING ON TESTING C9&C10. LEAKING. ISOLATE BACK TO C9 LEAKING. CYCLE/ GREASE. SLOWED DECLINE, BUT STARTED FALLING OFF MORE RAPIDLY WHEN WE BUMPED PRESSURE UP. BLOW DOWN SYSTEM. REPLACE VALVE. 06:00 - 18:00 12.00 CLEAN N WAIT PRE CONDUCT MAINTENANCE PROJECTS THROUGHOUT RIG. -CONDUCT PRE-SPUD AND DIFFERENTIAL STICKING BRIEFS WITH NEW CREW COMING ON HITCH -CONDUCT DROPPED OBJECT MANAGEMENT SYSTEM(DOMS)INSPECTION ON RIG FLOOR AREA 18:00 - 00:00 6.00 CLEAN N WAIT PRE CONTINUE MAINTENANCE -BLEW DOW CEMENT LINE. SERVICED SR10. -CREW MEMBER WORKING ON NEW STACK AT NOC. -REPLACED STEAM VALVE ON ROUGHNECK HEATER BY REEL -SERVICED RIG FLOOR WINCH'S CHECKAED'S 4/16/2017 00:00 - 17:30 17.50 CLEAN N WAIT PRE CONTINUE TO WAIT ON ORDERS -BRING IN AND DRIFT AND TALLY LINER. CONTINUE WORKING ON HOUSEKEEPING / MAINTENANCE. -WIOP TRAINING FOR VAN CLEVE CREW -WELLWORC TRAINING DRAWWORKS BRAKE INSPECTION. Printed 5/6/2017 4.56 37PM *All depths reported in Drillers Depths* • North America-ALASKA-BP • Page 4 et,a4 Operation Summary Report Common Well Name:03-24 AFE No Event Type:RE-ENTER-ONSHORE(RON) Start Date:4/12/2017 End Date:4/25/2017 jX3-01871-C:(2,199,128.00) Project:Prudhoe Bay Site:PB DS 03 Rig Name/No.:CDR-2 Spud Date/Time:9/21/1983 12:00:00AM Rig Release:4/28/2017 Rig Contractor:NABORS ALASKA DRILLING INC. BPUOI:USA00001401 Active datum:Original KBE @62.00usft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (usft) 17:30 - 18:10 0.67 CLEAN N WAIT PRE LOW LEVEL H2S AMBER LIGHT WENT OFF STARTED PREPARATIONS TO EVACUATE. TOURPUSHER VERIFIED WHICH HEAD SETTING OFF LOW LEVEL ALARM. WELL I WAS ALREADY SHUT IN AND SECURE. DERRICKMAN MOBILIZED HANDHELD MONITOR AND HAD NO READINGS AT SHAKER. HIGH LEVEL WENT OFF WITH AUDIBLE ALARM. STILL NO READINGS ON HANDHELD. -PERSONNEL EVACUATED TO SAFE AREA. ALL PERSONNEL WERE ACCOUNTED FOR. TIER 3 NOTIFICATIONS WERE MADE. H2S HEAD IN PITS HAD GOTTEN WET DUE TO DERRICKMAN POWER WASHING WALLS IN PITS. -ALL CLEAR WAS GIVEN. AAR PERFORMED. -ELECTRICIAN REPLACED AND RECALIBRATED H2S HEAD AT SHAKER. 18:10 - 00:00 5.83 CLEAN N WAIT PRE ,CONTINUE WITH MONTHLY INSPECTIONS. -CONDUCTED CAMP FIRE DRILL WITH JURY CREWAND SUPPORT PERSONNEL, CONDUCT AAR. EMPHASIS ON HOW TO MAKE EMERGENCY CALLS,WHERE TO REPORT,GRABBING MEDICATIONS AND ID. 4/17/2017 00:00 - 06:00 6.00 CLEAN N WAIT PRE CONTINUE TO WAIT ON ORDERS. -WORK ON MAINTENANCE CHECKLISTS 06:00 - 00:00 18.00 CLEAN N WAIT PRE WAIT ON ORDERS. i-WORK ON MAINTENANCE CHECKLISTS I-WORK ON MODIFYING REEL BUSHING ON NEW REEL -CONDUCT INSPECTION ON CRITICAL ITEMS LISTING 4/18/2017 00:00 - 02:00 2.00 CLEAN N WAIT PRE CONTINUE WITH MAINTENANCE. 02:00 - 03:30 1.50 CLEAN N WAIT PRE PJSM, DISCUSS LOADING COIL WITH METHANOL SPEAR AND 1%KCL -LOAD 15 BBLS METHANOL. CHASE WITH 1%SLICK KCL WITH CFS-520. FLUSH ALL PATHS IN SUCTION MANIFOLD FROM ALL PITS AND THROUGH BOTH PUMPS. CHASE ALL FRESHWATER TO TIGER TANKS.SHUT PUMPS DOWN WHEN METHANOL HIT OUT MICROMOTION. SERVICE R7. VALVE NOT 'HOLDING. 03:30 - 08:30 5.00 CLEAN N WAIT PRE BRINGING ON USED MUD TO SHAKER/ PROCESS -SEND TRUCK BACK TO MUD PLANT FOR I LAST LOAD OF MUD. -EVACUATE TIGER TANK OF FRESHWATER AND DISPOSE OF OFFSPEC 1%SLICK KCL -CALLOUT LOAD OF 130°1%SLICK KCL W/ CFS-520 CANCEL TILL WE GET WORD -PREPARED FOR OPS AS SOON AS GO AHEAD IS GIVEN. Printed 5/8/2017 4:56:37PM *AII depths reported in Drillers Depths* • 11) North America-ALASKA-BP Page 5 Operation Summary Report Common Well Name:03-24 AFE No Event Type:RE-ENTER-ONSHORE(RON) Start Date:4/12/2017 End Date:4/25/2017 X3-01871-C:(2,199,128.00) Project:Prudhoe Bay Site:PB DS 03 Rig Name/No.:CDR-2 Spud Date/Time:9/21/1983 12:00:OOAM Rig Release:4/28/2017 Rig Contractor:NABORS ALASKA DRILLING INC. BPUOI:USA00001401 Active datum:Original KBE @62.00usft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) ' (usft) ' 08:30 - 20:00 11.50 CLEAN N WAIT PRE CREW DISCUSSION REGARDING THE STEPS I IN THE"STOP"PROCESS,ENSURING PROCEDURAL DISCIPLINE,AND HOW TO ! I PROPERLY CONDUCT LO/TO AND CONTROL THE WORK FLOW. -CONDUCT A BRIEFING ON HOW TO I PROPERLY CALIBRATE THE TEST CHART , 'RECORDER AND HOW TO USE IT. 20:00 - 00:00 4.00 BOPSUR N WAIT PRE DISCUSSIONS WITH TOWN. NOTICE GIVEN TO AOGCC TO PERFORM BOPE TEST -AOGCC GUY COOK WAIVED WITNESS. -VALVE CREW CAME AND SERVICED MASTER AND SWAB -PULL FLOATS OUT OF UQC. I ,1 -REVERSE CIRCULATE TO FLUID PACK. , CLOSE IRV. TEST PACKOFFS/IRV TEST TO ' 1250#LOW/3500#HIGH -REINSTALL FLOATS. TEST FLOATS TO 250# LOW/3500#HIGH PASSED. 4/19/2017 00:00 - 02:00 2.00 BOPSUR 1 N WAIT PRE 1RIG UP TO TEST -PJSM ON BOP TESTING AND REVIEWED , j PRESSURE CROSSCHECK CARD -PURGE SURFACE LINES -PERFORM SHELL TEST TO 3500 PSI FOR 5 !MINUTES 02:00 12:00 10.00 BOPSUR N WAIT ! PRE TEST BOPE TO 250 PSI LOW,3500 PSI HIGH FOR 5 MINUTES EACH , !-ALL TESTS CHARTED,SEE ATTACHED BOP TEST CHARTS , -TEST WITNESS WAIVED)BY AOGCC REP GUY COOK TEST BOPE TO 250 PSI LOW,3500 !PSI HIGH FOR 5 MINUTES EACH -TEST WITH 2-3/8"AND 3-1/2"TEST JOINTS -ALL TESTS CHARTED ON CHART RECORDER 1 -TEST GAS ALARMS -5K STACK BOP COMPONENTS CONSIST OF FROM TOP DOWN:ANNULAR,BLIND SHEAR, 2-3/8"PIPE SLIP RAMS,MUD CROSS WITH CHOKE/KILL HCR,2-3/8"BY 3-1/2"VARIABLE RAMS,2-3/8"PIPE SLIP RAMS -CONDUCT ACCUMULATOR DRAWDOWN TEST,FUNCTION BOP COMPONENTS FROM BOTH DRILLERS CONSOLE AND REMOTE ,CONSOLE -FAIL/PASS ON VALVES BL1,BL2 AND B3 12:00 - 13:00 1.00 BOPSUR N RREP PRE TEST BOPE -FINISH REPAIR ON B3 AND RETEST, PASSING TEST 13:00 - 15:00 2.00 BOPSUR N WAIT PRE AUTHORIZATION TO PROCEED WITH THE BOTTOM HOLE KILL GIVEN FROM WELL I SUPERINTENDENT ABBY WARREN@ 1300 HRS ,-ORDER ONE DIRTY 290 VAC TRUCK AND ONE 290 BBL KCL VAC TRUCK FOR WELL KILL FROM CH2MHILL Printed 5/8/2017 4.56.37PM *AII depths reported in Drillers Depths* • North America-ALASKA-BP Page ocraN Operation Summary Report Common Well Name:03-24 AFE No Event Type:RE-ENTER-ONSHORE(RON) Start Date:4/12/2017 End Date:4/25/2017 X3-01871-C:(2,199,128.00) Project:Prudhoe Bay Site:PB DS 03 Rig Name/No.:CDR-2 Spud Date/Time:9/21/1983 12:00:00AM Rig Release:4/28/2017 Rig Contractor:NABORS ALASKA DRILLING INC. BPUOI:USA00001401 Active datum:Original KBE @62.00usft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (usft) 15:00 - 19:00 4.00 CLEAN N WAIT PRE AUTHORIZATION TO PROCEED WITH PLANNED OPERATIONS @ 1500 HRS PJSM, DISCUSS LOADING COIL WITH METHANOL SPEAR AND 1%KCL -LOAD 15 BBLS METHANOL. CHASE WITH 1%SLICK KCL WITH CFS-520. FLUSH ALL PATHS IN SUCTION MANIFOLD FROM ALL PITS AND THROUGH BOTH PUMPS. CHASE ALL FRESHWATER TO TIGER TANKS.SHUT PUMPS DOWN WHEN METHANOL HIT OUT MICROMOTION. 19:00 - 22:30 3.50 CLEAN P PRE PJSM, DISCUSS PRESSURE CROSSCHECK. OPEN WELL UP TO CLOSED CHOKE. WELL ON VACUUM. RIH W/CHOKE CLOSED. AT 1000'. WELLHEAD STARTED CLIMBING. SEND RETURNS TO TIGER TANK. SET CHOKE TO 200#SET POINT. RIH CIRCULATING AT 0.25/ 0.5 BPM. PU WEIGHT AT 7500' IS 32K/13.5K RIH PU WEIGHT AT 12,000'IS 55K, 17K RIH RIH AND TAG TD. 12781' TAG TWICE. MT TIGER TANK. 22:30 - 00:00 1.50 CLEAN P PRE BRING PUMPS UP TO 4.0 BPM CIRCULATE 1%SLICK KCL W/CFS-520. TAKE ALL RETURNS TO TIGER TANK 4/20/2017 00:00 - 05:30 5.50 CONDHL P PRE FINISH SWEEPING WELL WITH 1%SLICK KCL W/CFS-520. PURGE GAS FROM LUBRICATOR. MT FLOW BACK TANK. PUMP 40 BBLS HIVIS KCL SPACER THEN USED MUD. SWAP WELL TO 8.7 PPG USED QUIKDRIL-N -RATE:3.48 BPM IN,3.25 BPM OUT -MUD WEIGHT:8.72 PPG IN,8.42 PPG OUT -MUD LOSSES:15 BBL/HR WITH BACK PRESSURE OF 285# -FLOW CHECK FOR 10 MINUTES,3-6 BPH LOSS RATE 05:30 - 07:30 2.00 CONDHL P PRE POH F/12,763 TO 20' -1.8 BPM/1135 PSI -LOSS 6 BARRELS OVER CALCULATED FILL ON TOH -FLOW CHECK AT BHA,STATIC 07:30 - 08:00 0.50 CONDHL P PRE LD NOZZLE BHA 08:00 - 09:30 1.50 STWHIP P WEXIT MAKE UP MILLING BHA -PJSM WITH NABOR RIG CREW,BP AND BAKER 09:30 - 12:00 2.50 STWHIP P WEXIT RIH -AAR ON MU BHA WHILE TIH -TIE INTO GR-14 FT -ESTABLISH PARAMETERS -46 PUWAT 12500'/20K SOW -2.7 BPM/2350 PSI -8.7 MUD WT IN AND OUT 12:00 - 13:00 1.00 STWHIP P WEXIT WASH 12500-12781 -2.7 BPM/2400 PSI 13:00 - 14:00 1.00 STWHIP P WEXIT MILL WINDOW -DRILL SOFT CEMENT 12,281-12,809 -2.7 BPM/2400 PSI -LOSS RATE LESS THAN 5 BPH Printed 5/8/2017 4:56:37PM *All depths reported in Drillers Depths* • i North America-ALASKA-BP Page 7 4)111 Operation Summary Report Common Well Name:03-24 AFE No Event Type:RE-ENTER-ONSHORE(RON) Start Date:4/12/2017 End Date 4/25/2017 X3-01871-C:(2,199,128.00) Project:Prudhoe Bay Site:PB DS 03 Rig Name/No.:CDR-2 Spud Date/Time:9/21/1983 12:00:00AM Rig Release:4/28/2017 Rig Contractor:NABORS ALASKA DRILLING INC. BPUOI:USA00001401 Active datum:Original KBE©62.00usft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (usft) Nil- 14:00 - 18:00 4.00 STWHIP P WEXIT MILL 3.80"WINDOW IN 7" 29#LINER PER J�f� BAKER REP FROM 12,809'MD TO 12812'MD 03'2,43 -RATE:2.70 BPM IN,2.70 BPM OUT -MUD WEIGHT:8.7 PPG IN,8.7 PPG OUT 18:00 - 00:00 6.00 STWHIP P WEXIT MILL 3.80"WINDOW IN 7.0"CASING PER BAKER REP FROM 12812'MD TO 12815'MD -RATE:2.68 BPM IN,2.60 BPM OUT MUD WEIGHT:8.72 PPG IN,8.66 PPG OUT -DWOB:2.75-3.50KLBS -CIRC PRESSURE:2200 PSI/384# DIFFERENTIAL FREE SPIN -MOTOR WORK 300-400#. -TIME MILLING 0.3 FPH. 4/21/2017 00:00 04:00 4.00 STWHIP P WEXIT MILL 3.80"WINDOW I'N 7.0"CASING PER BAKER REP FROM 12815'MD TO XXXX MD -RATE:2.60 BPM IN,2.54 BPM OUT -MUD WEIGHT:8.72 PPG IN,8.66 PPG OUT -DWOB:2.5-3.5 KLBS -CIRC PRESSURE:2400 PSI GOOD INDICATION WINDOW MILL EXITED AT 12816.7 TIME MILL FOR STRING REAMER EXIT. TIME MILL TO 12817'. START MILLING RATHOLE. MILL RATHOLE TO 12827' LET MILL OFF. NOT GETTING ANY SAMPLE DUE TO LARGE HOLE VOLUME. 04 00 - 06 00 2.00 STWHIP P WEXIT REAM WINDOW -PERFORM 3 REAMING PASSES AT 1'/MIN. NOTE ANY MOTOR WORK SEEN RATE:2.58 BPM IN,2.52 BPM OUT -PU:43 KLBS,SO:24 KLBS 06:00 - 08:30 2.50 STWHIP P 1 WEXIT POH WITH WINDOW MILLING BHA -FLOW CHECK FOR 10 MINUTES BEFORE POH,WELL STATIC -POH WITH EDC OPEN PUMPING AT 4 BPM/ 2760 PSI 08:30 - 10:00 1.50 STWHIP P WEXIT LAY DOWN MILLING BHA -MILL 3.79"AND REAMER 3.80" 10:00 - 11 30 1.50 DRILL P PROD1 MAKE UP BUILD ASSEMBLY AND PJSM -ULTRA LS MOTOR SET AT 1.3 DEGREE AKO -3.75 X 4.25 HCC BI-CENTER 11:30 - 14:00 2.50 DRILL ' P PROD1 TIH -SHALLOW HOLE TEST MWD,GOOD TEST -TIH PUMPING 0.4 BPM, -LOST 5 BPH ON TIH 14:00 - 15:00 1.00 DRILL P PROD1 TIE-IN DEPTH -0.3 BPH -LOG FROM 11,620-11,696 -17 FOOT CORRECTION -LOG 12705'-12725 NO GR INDICTATION -TAG BOTTOM AT 12,822-5'HIGH 15:00 - 21:30 6.50 DRILL P PROD1 DRILL 4-1/4"BUILD FROM 12822'MD TO 12929' MD -FREE SPIN:2350 PSI,2.70 BPM -RATE:2.70 BPM IN,2.58 BPM OUT. -MUD WEIGHT:8.73 PPG IN,8.68 PPG OUT, ECD:9.55 PPG -ROP:15 FT/HR,WOB: 1-3.5 KLBS Printed 5/8/2017 4:56.37PM *AII depths reported in Drillers Depths` j TFEE.= FMC GEN 3 • ,. . . _ VVB_LHEAD= SAlkDcTES:WELL ANGLE>70°@ 12956'***WELL. FMC K SCREEN TO FLOW DUE TO CORRODED ACTUATOR= BAKER c 03—24A N UNER**°FHUTIW HBBP PKRS HAVE REDUCED TEST OKB 62' PRES. UNITS IN SOME CASES.CONT.ACE(x5102) REF ELB/= 62' PRIOR TO PRES.TEST.LDL:LOWER PORT.OF BTM OF BE 13_EV= 29.77' ......COL APP.TO BE LEAKING*"CHROME TBG*** KOP= 1400' Max Angle= 88°@ 12944' I 2006' I--15-1/2"FES X NP,ID=4.562 1 Datum A/D= 13228' Datum ND= 8800'SS GAS LFT MANDRELS ST MD ' ND DEV TYPE VLV LATCH PORT DATE 20"CONDUCTOR,91 5#,H-40,ID=19.124' H 116° _2 3 4522 3686 56 MMG DOME RK 16 10/23/16 2 8363 5996 54 MMG SO RK 20 11/07/16 13-3/8'CSG,72#,L-80 BTRS,0=12.347" H 2639' 1 11110 7583 53 MMG OMY RK 0 03/05/10 Minimum ID =3.813" @ 12479' I . 12106" —15-1/2'I-ES X NP,0 4.562 4-1/2" OTIS X NIPPLE 0 ..- 1 21 3 7* H9-518"x 5-1/2"TNT IzKR,0=4.892' I 1 2 173' —15-1/2"hES X NP,ID=4.562 5-1/2'TBG,174,13CR-80 VAM TOP I-IC, —1 12256' — .0232 bpf,D=4.892' 12258' 1-19-5/8"X 5-1/2"UNIQUE OVERSI-40T I Z F 12363' I—9-5/8"X 5-1/2'TM/HBBP PKR,0=4.75" 1 5-1/7 TBG, 174,13CR-80 , _0232 bpf,0=4.892" H 12378' ' — 12378' —I5-12' X 4-1/7 XO,ID=3.958" I 111 12479' 1—4-1/7 OTIS X MR D=3.813" 1 TOP OF 7"LM —I 12494' I I 1 1 249 6' 1-14-1/2"OTIS xN NIP,MLLE!)TO 3.80'(1998 CTD) 1 4-1/7 TBG, 12.6#,13CR-80 NSCC, —1 12508' •-/ •--. 12508' 1-14-1/2"1M_EG,ID=3 958" 1 .0152 bpf,ID=3.958' 12504' 1-1 ELMD TT LOGGED 11/20/95 I TOC(03/06/17) 12780' 9-5/8"CSG,47#,L-80 BTRS,ID=8.681" 12785' M$114 ik - 12798' —4-1/2"X 7"DELTA WHIPSTOCK w/2 RA 1M FERFORADON SlACIARY PP TAGS(01/28/17) 4 , REF LOG BI-ICS ON 10/11/83 ANGLE AT TOP FERF:50°@ 13214' FA ,A MLLOUT IMMX/W(03-24A) 12806 -????' Node:Refer to Roducbon DB for historical perf data ..4 .4 SIZE I SPF I INTERVAL 10pn/Sqz 1 SHOT I SQL e+.* a 4 4. 12810' I—FISH:3.78"X 1..15'oFn-cur MLL-2ND FISH: 1-11/16" 30 13214-13244 S 03/08/98 03/06/17 r.V.W.', C.ENIRALCZER ARM FROM PDS CALFER 1-11/16' 10 13260-13270 S 03/0S/98 03/06/17 14.44414 41./0.444, 14.044444 1/4"X 3/4"X 6-3/4"LONG(11/03/16) ••••••••0 lia•••••••• VC ' '• ' s' . . . • . ' , ... • 4. 1 7'LNR,29#,L-80 SIRS, _0371 bpf,ID=6.184' IH 1280 6' 4111o. doll. TOP OF 3-3/16"UM(TAGGF3)&RECOVERED —I 12898' ., CEMENT CHUNKS-03/30/14) AN, PBTD H 13497' AtailiN,. NI4itIt' Ny 3-3/16"Lt,R,6.2#,L-80,.0076 bpf,ID=2.80" 13531' DATE REV BY COMMENTS DATE REV BY COMJENTS DHOE BAY UNIT 10/18/83 RWN 35 IMT1AL COMPLETION 11/16/16 .1141/JRAD GLV C/0(11/07/16) WELL: 03-24A 05/19/94 016 RWO 11/28/16 LI/JM) SET FISH(11/03/16) TERMT No:'1980060 02/23/98 N4ES CTD SDTRACK(03-24A) 12/06/16 J14JJM) ADDED REF 8 BF ELEVATIONS AR No: 50-029-21015-01 03107/10 D-16 MVO 01/31/17 C4-6/JIVD SET WHIPSTOCK w/2 PP TAGS(1/28/17) SEC 10,T1ON,R15F,522'FII 8 664'F14_ 04/08/14 RM- PJC TAG TOL(CMT aiunKs-3I30/14)-03/07/17, JIDM/JP/D CMTM-PSTOCK/SQZ FERFS 10/24/16 ZV/JMD GLV C/O(10/23/16) BP Exploration(Alaska) r7—/-) nig vv6.., Loepp, Victoria T (DOA) From: Lastufka, Joseph N <Joseph.Lastufka@bp.com> Sent: Wednesday, January 11, 2017 9:44 AM To: Loepp,Victoria T(DOA) Subject: FW:03-24B and 03-27A BOP Schematics Attachments: CDR2 Bighole BOP Stack.xls Follow Up Flag: Follow up Flag Status: Flagged Victoria, Please see attached new BOP sketch for 2 wells that sundries were approved with a previous BOP. (P03-24A (PTD# 198-006, sundry#316-611) 03-27 (PTD# 184-062, SUNDRY#316-621) The BOP will also be needed for the approved PTD for 03-24B and 03-27A. If you have any questions or need additional information, please let me know. Thanks, Joe From: Browning, Zachary H Sent: Wednesday, January 11, 2017 9:40 AM SCANNED APR 2 8 2017. To: Lastufka, Joseph N Subject: 03-24B and 03-27A BOP Schematics Joe, See the following BOP schematic attached which is accurate for both wells. Thanks, Zach Browning 2 CTD&RWO Engineer BP Alaska 0:(907)564-5220 C:(907)351-7941 Zachary.browning@bp.com Sometimes you must sacrifice the good,to achieve what is great. 1 Well BlankIII CDR2-AC BOP Schematic 0 Date Quick Test Sub to Otis -1.1 ft Top of7"Otis CDR2 Rig's Drip Pan , Distances from top of riser Excluding quick-test sub Top of Annular I 0.0 ft 1 ► ,v-..„......,... 7-1/16"6k Flange X r ots Box C. dril71/1. r Top Annular Element 0.7 ft Annular Bottom Annular 2.0 ft ► MIME Blind/Shear CL Blind/Shears I 3.3 ft ► 2-3/8'Pipe/Slips CL 2-3/8"Combi's 4.1 ft Deployment Line as s e a -" I' 7-1/16 "" "" e e 1II ► -1a1 f sk Mua F 1�,4 k- Mt -r-.Ngni meow Ya i". is cross �a ■� et ,II Ill II Choke Line 3"Pipe/Slips CL 3"Pipe/Slips 6.6 ft 2-3/8'x 3-1/2"VBR CL 2-318"x3-1/2"VBRs 7.4 ft ► 81 I 82 I Choke Line Kill Line ille- Frw �0ow 4 a1 ow I.A Ii 0'4r s ras MMI 0 III II ill z CL Blind/Shears 10.0 ft ► �! 2-3/8"Pipe/Slips ..i k CL 2-3/8"Combi's 10.7 ft ► _�. ♦ CL of Top Swab 13.3 ft VAI 4 -Swab 2 Test Pump Hose . . e/'Swab 1 CL of Bottom Swab 14.8 ft 14 T1 i T2 CL Flow Tee 16.2 ft - ••• : ••• - - BOP2 CL of SSV 17.5 ft I _ I Master 2 } Fusable CL of Master Valve 19.0 ft BOPI n117 Master 1 LDS 20.5 ft -----._i._ _ om. ,1 1.....4 #1 ei dining 1111.111 ii till II li yr Gound Level �4 r II IIII MEM n-u m■■D in `9 y o>F • "\\ 1,7,-,.. THE STATE Alaska Oil and Gas I =�� Of T � A � � Conservation CommissionLAWEr __'__ Ll 1���!\l 1___ 333 West Seventh Avenue GOVERNOR BILL WALKER Anchorage, Alaska 99501-3572 p Main: 907.279.1433 A .Sr' Fax: 907.276.7542 www.aogcc.alaska.gov John Egbejimba Drilling Supervisor 6 �� _ BP Exploration(Alaska), Inc. Box 196612 Anchorage, AK 99519-6612 Re: Prudhoe Bay Field, Prudhoe Bay Oil Pool, PBU 03-24A Permit to Drill Number: 198-006 Sundry Number: 316-611 Dear Mr. Egbejimba: Enclosed is the approved application for sundry approval relating to the above referenced well. Please note the conditions of approval set out in the enclosed form. As provided in AS 31.05.080, within 20 days after written notice of this decision, or such further time as the AOGCC grants for good cause shown,a person affected by it may file with the AOGCC an application for reconsideration. A request for reconsideration is considered timely if it is received by 4:30 PM on the 23rd day following the date of this letter, or the next working day if the 23rd day falls on a holiday or weekend. Sincerely, aje2.0.4,54„____ Cathy P. oerster Chair DATED this 4day of January, 2017. RBD J!S LA— JAN 2 5 2017 STATE OF ALASKA •LASKA OIL AND GAS CONSERVATION COMMI ' APPLICATION FOR SUNDRY APPROVALS 20 MC 25.280 1. Type of Request: Abandon 0 Plug Perforations ❑ Fracture Stimulate 0 Repair Well ❑ Operations shutdown 0 Suspend 0 Perforate ❑ Other Stimulate 0 Pull Tubing 0 Change Approved Program ❑ Plug for Redrill ® • Perforate New Pool 0 Re-enter Susp Well 0 Alter Casing 0 Other 0 2. Operator Name: BP Exploration(Alaska),Inc 4. Current Well Class: 5. Permit to Drill Number: 198-006 r 3, Address: P.O.Box 196612 Anchorage,AK Exploratory 0 Development a 99519-6612 Stratigraphic 0 Service ❑ 6. API Number: 50-029-21015-01-00 - 7. If perforating: 8. Well Name and NuRECEIVED What Regulation or Conservation Order governs well spacing in this pool? Will planned perforations require a spacing exception? Yes 0 No I3 PBU 03-24A- 9. Property Designation(Lease Number): 10. Field/Pools: 1:.. 0 lb /U ADL 028328 ' PRUDHOE BAY,PRUDHOE OIL ' P��5 �j. 4ii 11. PRESENT WELL CONDITION SUMMARY O ACU Total Depth MD(ft): Total Depth TVD(ft): Effective Depth MD: Effective Depth TVD: MPSP(psi): 1 Plugs(MD): Junk(MD): 13531 ' 9062 13497 9038 2428 ,! None 12810 Casing Length Size MD TVD Burst Collapse Structural Conductor 80 20" 35-115 35-115 1490 470 Surface 2606 13-3/8" 35-2641 35-2548 4930 2670 Intermediate 12754 9-5/8" 32-12786 32-8654 6870 4760 Liner 314 7" 12492-12806 8453-8667 8160 7020 Liner 633 3-3/16 12898-13531 8711 -9062 Perforation Depth MD(ft): Perforation Depth TVD(ft): Tubing Size: Tubing Grade: Tubing MD(ft): 13214-13270 8839-8875 5-1/2",17#/4-1/2",12.6# 13Cr80 30-12266/12314-12516 Packers and SSSV Type: 5-1/2"HES TNT Packer Packers and SSSV MD(ft)and TVD(ft): 12146/8220 5-1/2"Baker FHL Prod Packer 12372/8371 12.Attachments: Proposal Summary H Wellbore Schematic 0 13.Well Class after proposed work: Detailed Operations Program 0 BOP Sketch ® Exploratory 0 Stratigraphic 0 Development I1 - Service 0 14.Estimated Date for Commencing Operations: January 1,2017 15. Well Status after proposed work: Oil 0 WINJ 0 WDSPL 0 Suspended ® • 16.Verbal Approval: Date: GAS ❑ WAG 0 GSTOR ❑ SPLUG ❑ Commission Representative: GINJ 0 Op Shutdown 0 Abandoned 0 17.I hereby certify that the foregoing is true and the procedure approved herein will not Contact Hyatt,Trevor be deviated from without prior written approval. Email Trevor.Hyatt@bp.com Printed Name John VV��EgbejimbaOTitle Drilling Supervisor Signature . / .t• � � .Q Phone +1 907 564 4139 Date /2/6 /..o/6 ..✓✓✓✓JJ COMMISSION USE ONLY Conditions of approval:Notify Commission so that a representative may witness Sundry Number: 1O � l� - CT k Plug Integrity 0 BOP Test 19 Mechanical Integrity Test 0 Location Clearance 0 Other: �30D 1-r-,5t -to �-5-00 h 5 i-9 � "r 114 1 (i-�rvl ar pr^CV'fv�71--tom d' i 25U� 51 `� �j�0 v f U Post Initial Injection MIT Req'd? Yes❑ No �J�>� 1 tt rn e r��(,.-;4-4-6-z , 2- (I-- / Spacing Exception Required? Yes 0 No L�f Subsequent Forn1Required: ` - 4 0 4 7_ 167 i° /'�� APPROVED BYTHE COMMISSION Date: 7 Approved by: COMMISSIONER -- -.-../7 V'T1— l/3/)� l ORIGINAL RBDMs Lt- JAN 2 5 2017 Submit Form and Form 10-403 Revised 11/2015 Approved application is valid for 12 months from the date of approval. Attachments in Duplicate • • • To: Alaska Oil & Gas Conservation Commission From: Trevor Hyatt � by CTD Engineer Date: December 2, 2016 Re: 03-24A Sundry Approval Sundry approval is requested to plug the 03-24A liner perforations as part of the drilling and completion of the proposed 03-24A CTD sidetrack. History and current status: Well 03-24 was drilled and produced in October 1983. 03-24 was worked over in May 1994. In February 1998 a CTD sidetrack was performed to 03-24A due to gas from extensive corrosion in liner. In 2004, corroded tubing was found at surface from the CTD sidetrack liner. A calliper confirmed missing 3- 1/2" liner was missing and only cement was present in a section of the well. A workover was performed in March 2010 to repair collapsed tubing and repair TxIA communication. This well is not competitive and is ready for a sidetrack. Proposed plan: Nordic 2 Coiled Tubing Drilling rig will drill a through tubing sidetrack on or around February 15th, 2017. Nordic 2 will exit into TSGR formation above the existing 03-24A perforations. The sidetrack will target Zone 4 reserves. The proposed sidetrack is a 1,828' MD horizontal Ivishak Zone 4 producer.The lateral will be completed with a 3-1/2"x 3-1/4" x 2-7/8" 13Cr liner which will be cemented and perforated isolating the current Zone 4 perforations. This Sundry covers plugging the existing 03-24A perforations via the 03-24B liner cement job or liner top packer set post-rig (alternate plug placement per 20 AAC 25.112(i)). The following describes work planned and is submitted as an attachment to Form 10-403. A schematic diagram of the current wellbore and proposed sidetrack is attached for reference. `"L ! 'c Cf 14,e, fi occf w ''p4 q ws cup` °�of cr f 6sAd co,Lu r. I1�UP� 66A Of N orWsie . 7tie well 4,J ,`rile if (4 ft/kfi"//1/* 1+311 q 5 ddrfack Shoup c Ilow 6r 1 (11Imre (e Go vcry fro,* r4,f f/11:04 Qf Tkc poo(. • • Pre-Rig Work 1. S Drift for Whipstock. Set Generic GLV Design. 2. E Set 4-1/2" x 7" Delta whipstock ��`�� 3. V Pre CTD Tree Work ATI v Rig Work: 1. MIRU and test BOPE to 250 psi low and 3 0 si high. Maximum expected surface pressure with gas (0.10 psi/ft) to surface is 2,428 psi. 2. Mill 3.80" window plus 10' of rathole. Swap the well to 8.5-9.5 ppg drilling mud. 3. PU drilling BHA with GR/Resistivity 4. Drill 4.25" hole to TD at-14,618' MD I\,/ 5. Run 3-1/2" x 3-1/4" x 2-7/8" 13Cr liner leaving TOL at-12,215' MD. �1 6. Pump primary cement bringing TOC to TOL, 34.7 bbls of 15.3 ppg liner cement planned* 7. Cleanout liner and run GR/CCL/RPM log if cement job does not go as planned. 8. Test liner lap to 2,500 psi. G---� PT P 9. Freeze protect well, RDMO Post Rig: 1. V: Tree work as necessary. 2. S: LTP if necessary*. 3. F: Pressure Test LTP if necessary. 4. C: RPM Log. Perforate -30' MD. 5. T: ASRC flowback. *Approved alternate plug placement per 20 AAC 25.112(i) Trevor Hyatt CTD Engineer 564-4627 • CC: Well File Joe Lastufka TREE= FMC G8V 3 . SAFE TES:WELL ANGLE>70°@ 12956'"'WELL WELLHEAD= FMC 03-24A 3_24A NEEDS ROCK SCREEN TO FLOW DUE TO CORRODED _ACTUATOR= BAKER C LINER FHLRIW HBBP PKRS HAVE REDUCED TEST tNff1AL KB.8 E 62' PRES. LIMITS IN SOME CASES.CONT.ACE(x5102) BF.8_EV= 21.72' I KOP= 1400° PRIOR TO PRES.TEST.LDL:LOWER PORT.OF BTM OF Max Angle= 88"@ 12944' COL APP.TO BE LEAKING***CHROME TBG*** Datum MD= 13228' ' Datum TV D= 8800'SS ( 2006' �—�5 112"FES X Pte,D 45621 GAS LFT MANDRELS 20"CONDUCTOR,91.5#,H-40,DST MD 1VD D =19.124" H 116' EV TYPE VLV LATCH PORT DATE 13-3/8'CSG,72#,L-80 BTRS,D=12.347" H 2639' 3 4522 3686 56 MMG DOt RK 16 10(23!16 2 8363 5996 54 MIG SO RK 20 11/07/16 1 11110 7583 53 MMG OMY RK 0 03/05/10 Minimum ID =3.813" @ 12479' 1 I 12106' H5-1/2-FES X NP,D=4.562 4-1/2" OTIS X NIPPLE pl 12137' H9-518"x 5-1/2"TNT PKR,D=4.892" �I 12173` —15-112"HES X MP,D=4.562 5-1/2'TBG,17#,13CR-80 VAM TOP HC, 12256' .0232 bpf,D=4.892" 1—r1.. 12258' H9-5/8-X 5-1/2'UNDUE OVERSHOT Z X 12363' H9-5/8"X 5-1/2"TM/FDBP PKR,D=4.75' 5-1/2"TBG, 17#,13CR-80,.0232 bpf,D=4.892" H 12378' 1--‘ ,—{ 12378' —{S 1/2"X 4-1/2"XO,D=3.958" ' ' 12479' H4-112"OTIS X MP,D=3.813" TOP OF 7"LNR H 12494' I I 12495' —14-1/2"OTIS XN NP,MLL83 TO 3.80"(1998 LID) 4-1/2"TBG,12.6#,13CR-80 NSCC, H 12508' / 12508' —14-112"WLEG,D=3.958" .0152 bpf,D=3.958" 12504' H ELM)TT LOGGED 11/20/95 9-518"CSG,47#,L-80 BTRS,D=8.681" —1 12785' FEW-ORATION SUMMARY REF LOG:BHCS ON 10/11/83 ANGLE AT TOP PEW:50°{43 13214' ►111 1114 MLLOUT WIDOW(03-24A) 12806°-???7 Note:Refer to Production DB for historical perf data 11i1 *0 SIZE SPF INTERVAL Opn/Sqz SI-DT SOZ 1.4.• i 12810' —FISH:3.78"X 1.15'OP11-CUT MLL-210 FISH: 1-11/16" 30 13214-13244 0 03/08/98 1111/111111.-' 1-11/16" 10 13260-13270 0 03/08/98 11111141.111* CENTRALlZBR ARM FROM PDS CALFEi2 11111111111111i1 1/4"X 3/4'X 6-3/4"LONG(11/03/16) 11/1/1/1/11111/1• ►11/111111111111* ` 1 i�i�i�i�i�i�i14 7"LNR,29#,L-80 BIBS, .0371 bpf,D=6.184" H 12806' ` TOP OF 3-3/16"LNR(TAGGt33&RECOVERS) H 12898' CI3I ENT CHUNKS-03130114) PBTD 13497' 41,1.1&•.. 3-3/16"LNR,6.2#,L-80,.0076 bpf,ID=2.80" 13531' DATE REV BY COMMENTS DATE REV BY COMMBVTS FRUDHOE BAY UNIT 10/18/83 RWN 35 INTIAL COMPLETION 04/08/14 RM-11 PJC TAG TOL(CMT CHUNKS-3/30/14) _ W8_L: 03-24A 05/19/94" D16 RWO ^ 10/24/16 ZV/JMD GLV C/O(10123/16) PERMT No:'1980060 02123/98 MEG -CTDSD1RACK(03-24A) 11/16/16 JR,MJM).GLV C/O(11/07/16) AFI No: 50-029-21015-01 03/07/10 D-16 RWO 11/28/16 LYJMD SET FISH(11/03/16) SEC 10,T1ON,R15E,522'FB_&664'FPt. 02/23/14 CJNPJC 3-1/16"LNR CORRECTION/TAG 02/24/14 CJNMPJC 4-1/2"XN NP MLLE)1998 CIU BP Exploration(Alaska) _ FMC P RO P�E D► SA TES:WELL ANGLE>�°@ __ __•*** W�LHEAD= ACTUATOR= O 3 X24', CHROM TBG LNR*** 'NTT L Ka.Eli 62' REV 1 BF.ELEV= 21.72' KOP= 1400' 20"COND, H 116' Max Angle= _°@-_ — 91.5#,H-40, Datum ND= ID=19.124" , 2006' -15-1/2"1-ES X NP,ID=4.562 Datum TVD= 8800'SS GAS LFT MANDRELS 13-3/8"CSG,72#,L-80 BTRS,ID=12.347" H 2639' ST MD I\i 0 DEV TYPE VLV LATCH FORT DATE 3 4522 3686 56 MMG DOME RK 16 10/23/16 L 2 8363 5996 54 MMG SO RK 20 10/23/16 1 11110 7583 53 MMG DMY RK 0 03/05/10 Minimum ID =3.813" @ 12479' ' ' 12106' H5-1/2"FES X NP,ID=4.562 4-1/2" OTIS X NIPPLE 2:1I I 12137' -19-5/8'X 5-1/2"TNT FKR,D=a.s92" 12173' H S 5-1/2"F- X NP,ID=4.562 TOP OF 3-1/2"X 3-1/4"X 2-7/8"LNR/CMTD --I -12215' • . --r1,1° -14.375"BKR C2 SLV,D 3.680" 1-13.70"DEPLOYMENT SLV,ID=3.00" -I3-1/2"HES X NP,ID=2.813" 5-1/2"TBG,17#,13CR-80 VAM TOP HC, - 12256' 1—r .0232 bpf,D=4.892" 1---I 12258' H9-5/8"X 5-1/2"UNIQUE OVERSHOT 12363' -I9-5/8"X 5-1/2"TNV HBBP PKR ID=4.75" 5-1/2"TBG,17#,13CR-80,-0232 bpf,D=4.892" -1 12378' 9 --� 12378' H5-1/2"X 4-1/2"XO,D=3.958" ' ' 12479' -14-1/2'OTIS X NP,D=3.813" TOP OF 7"LNR -1 12494' _ 12495' HI4-112"OTIS XN NP,MILL®TO 3.80"(1998 CTD) 4-1/2"TBG,12.6#,13CR 80 NSCC, H 12508' i \--I 12508' -14-1/2"WLEG,D=3.958" .0152 bpf,ID=3.958" 12504' -1 ELMD TT LOGGED 11/20/95 3-1/2"LNR 9.3#,13-CR SIL, -{ -12750 H3-1/2"X 3-3/16"XO,ID=2.786" _0087 bpf,ID=2.992" 9-5/8"CSG,47#,L-80 BTRS,D=8.681" -1 12785' L MLLOUT VUI+DOW(03-24B) 12790'-????' 1/2^X 7"DELTA W-IPSTOCK L__t r ; -1 12790' . f PUP JT w/RA TAG 7"LNR,29#,L-80 BTRS,.0371 bpf,D=6.184" -1 -12790' i'1'1'4 ;' •Ff. ' 01.4t 11114 H3-3/16x2-718".D=2.377" 111P �4 PERFORATION SUAMW RY 111111111 11111♦ REF LOG ON_/ / 1111111. 11111111111/1111 ANGLE A l TOP PERF: 0 @ 11111111111111i1 Note:Refer to Production DB for historical perf data 4111114111i1 ' SIZE SPF INTERVAL Opn/Sqz SHOT SQZ 11111/11/111111144 "1".1.1.1.4 `J-1/4"LW, #, -I 13-CR SII.,. bpf.ID=-- PBTD H 41+r0 2-7/8"LNR,__P bpf,D - 14618' DATE REV BY COMMENTS LATE REV BY COM ENTS PR DHOE BAY UFIT 10118/83 MN 35 IMTIAL COM PLETTON 1,1/26/16 1TVJM1 BUILT PROPOSED REV 1 WELL: 03-24 05/19/94 D16 RWO FERMI No: 02/23/98 N4ES CTD SDTRACK(03-24A) AR No: 50-029-21015-0:' 03/07/10 D-16 RWO SEC 10,T1 ON,R15E,522'FEL&664'FNL 1 / CTD SDTRACK(03-24B) 10/26/16 JMD BUILT PROPOSAL BP Exploration(Alaska) • ._ _ I 1 1 1 L 1 1 1 1 E i y 1 04I *e. 1 lio } o',:4 i • I I / — I _I 1 I rr= • i v 1 Iiot 1 i' A\�\\\� 1 I i • 1 8 oi ill Yip.. i lb 41 o 1 I Y yl I I Q i ►i141 41 ' I Q 1 d a I I Elm' I J I u_ ii 1 I Nip.. z `, '� 1 1 1 I Z I ' 1 O_ E 1 Isl I 1 1— °I . u J 3 u �I I a. ,ss�.� _ T 1 t1. 1 II gi V .. I I_ - , � - I w_ • 1 I o U s Y 1 (� 1 I, 1 1 €> III re x 'my I:: a �2 , i.i. LIJ�� _�--.� Wa 1= 0 1 , . I 28 U x of 1 \\ I Nii ll v \ a 8 f 0 : i m U �i, V s` a Nom.o L� - I r R 1 N� i LL • u 0 it 0 0 i r Mill Z m I r� i ,+ X to o cr 1 e k'_ a 1 1 i a 4 S LD 0 N Produced Gas (Thousand Cubic Feet ("MCF") per Day) or Gas-Oil Ratio (MCF per Barrel) 0 OO O O 0 0 0 0 0 0 0 0 0 0 0 0 0 00 cc 001 CO0O^ tri Ul M N .0i O O y i r0 .9 2' ' l, lP 11/ /I O T Q ��� pro' ul a Y w .,. �r70lp > o O �, 2l -0 a ------- l4 0 o to •; P co - PI1/ c 0 a w- lr r0 0 Li) co N O _ _„.. r0 ' r0 O N CA /'� -.F., Q Q ------ ------------ 6, 1p v CO C h .Ot—i - Q1 --------- ---- -----____--- -_ ll _, X07 r0 t y . < `1 i. y ` p2o a Y _ �I/ 8 1' E 00 O, O c.,3 > O ._ o - V _ - 4 �0� l O -a N •O O -1- — _ — io Y 73 en i il • ; y /� 0 o CO r 2 O 11 a v v ds ( o i. Y GJ eO, r0 Q -- c,0 7 0 y'P!� o >, r0, r0 a in 00 -2.0 v y D.- 6 /� 113 I: 6o 4, °�S; a �6 l0 Io>3 X02 Q X64 l0 o o 0 o 0 0 0 0 0 P4rO LOTr N O 00 LO Ct N .4 ai ei ri Aea Jed ia}eM }o siaLieg JO Aea iad I10 0 slaiieg 0 0 0 a • • Sundry Application Plug for Re-drill Wells Work Flow This process is used to identify wells that are suspended for a very short time prior to being re- drilled. Those wells that are not re-drilled immediately are identified every 6 months and assigned a current status of"Suspended." Step Task Responsibl 1 The initial reviewer will check to ensure that the "Plug for Redrill"box Geologist in the upper left corner of Form 10-403 is checked. If the "Abandon" or ` "Suspend"boxes are also checked, cross out that erroneous entry and initial it on both copies of the Form 10-403 (AOGCC's and operator's copies). 2 If the "Abandon"box is checked in Box 15 (Well Status after proposed Geologist work) the initial reviewer will cross out that erroneous entry and initial then/ it on both copies of the Form 10-403 (AOGCC's and operator's copies). i> Instead, check the "Suspended" box and initial that change. Drilling Engineer The drilling engineers will serve as quality control for steps 1 and 2. (QC) 3 When the Stat Tech receives a Form 10-403 with a check in the "Plug Stat Tech for Redrill" box, they will enter the Typ_Work code "IPBRD" into the History tab for the well in RBDMS. This code automatically generates a comment in the well history that states "Intent: Plug for Redrill." 4 When the Stat Tech receives any Form 10-407, they will check the Stat Tech History tab in RBDMS for the "Intent: Plug for Redrill" code (IPBRD). If present and there is no evidence that a subsequent re-drill has been COMPLETED, the Stat Tech will assign a status of SUSPENDED to the well bore in RBDMS no matter what status is listed on the 10-407. The Stat Tech will also change the status on the 10-407 form to SUSPENDED, and date and initial this change. If the Stat Tech does not see the "Intent: Plug for Redrill" comment or code, they will enter the status listed on the Form 10-407 into RBDMS. 5 When the Form 10-407 for the redrill is received, the Stat Tech will Stat Tech change the original well's status from SUSPENDED to ABANDONED. 6 The first week of every January and July, the Stat Tech and one of the Stat Tech Geologists will check the "Well by Type Work Outstanding" user query Geologist in RBDMS to ensure that all of the Plug for Redrill wells have been handled properly. At this same time, they will also review the list of suspended wells for accuracy. ►°► ODC9 • Date: 10/27/2016 2:1 f xs.x, ,+ wx�t6ara Oepae t : Transmittal Number: 0127 RIGHT PLACE FIRST TIME GYRODATA SURVEY TRANSMITTAL State of Alaska - AOGCC �i DATA LOGGED � �� � \O 3v2o,a Attn: Makana Bender K GENDER 333 W 7th Avenue, Suite 100 OCT 2 8 2016 Anchorage, AK 99501 AOGCC Enclosed are the materials listed below. If you have any questions, please contact Steve Thompson: 907-250-1200• Stevet or Jamie McCrimmon: 403-640-7755; Jamiem�cr� yrodt com. '---��` Odata coni_ Drill Site SW Name Date Description 03 03-24A 10/24/2016 SURVEY REPORT: 1 Hard Co• ; 1 Disk / . ski, �) 7�, Please Sign and Return Ve copy of this transmittal to:ganctdcra�bn com aksurve srodata.c om Thank You, Steve Thompson Gyrodata Inc. KAMP Nov 0 3 2016 Gyrodata Incorporated 23000 Northwest Lake Drive Houston, TX 77095 \G1%-00(s) • • Z�CQ6� RECEIVED OCT 2 8 2016 AOGCC BP Exploration (Alaska) Inc. Drill Site: 03 Well: 03-24A Prudhoe Bay Unit 1 OF 14 AK1016GCN{142 • • A Gyrodata Directional Survey for BP EXPLORATION (ALASKA) INC. Lease: Drill Site 03 Well: 03-24A Location: Wellhead, Prudhoe Bay Unit Job Number: AK1016GCM142 Run Date: 24 Oct 2016 Surveyor: Adam O'Connor Calculation Method: MINIMUM CURVATURE Survey Latitude: 70.230057 deg. N Longitude: 148.282545 deg. W Azimuth Correction: None Gyro: Bearings are Relative to True North Depth Reference: Rotary Table Air Gap(RKB to MSL): 62.00 ft. Closure Calculated from Well Head Location Horizontal Coordinates Calculated from Well Head Location 2 OF 14 AK1016GCM142 • • gymdata A Gyrodata Directional Survey BP Exploration (Alaska) Inc. ' Lease: Drill Site 03 Well: 03-24A Location: Wellhead, Prudhoe Bay Unit Job Number: AK1016GCM142 MEASURED INCL AZIMUTH VERTICAL HORIZONTAL CLOSURE DOGLEG DEPTH DEPTH COORDINATES DIST. AZIMUTH SEVERITY feet deg. deg. feet feet feet deg. deg./ 100 ft. 0.00 0.00 0.00 0.00 0.00 N 0.00 E 0.0 0.0 0.00 0- 12,567 RATE GYROSCOPIC CONTINUOUS SURVEY RUN INSIDE 4.5-5.5"TUBING. ALL MEASURED DEPTHS AND COORDINATES REFERENCED TO RKB ELEVATION OF 62.00'AMSL. BF to MSL: 29.77' / BF TO SWAB: 9.0' I SWAB TO GYRO SENSOR: 7.0' / ZERO TOOL ON SWAB AT+16.23' 100.00 0.19 45.51 100.00 0.11 N 0.12 E 0.2 45.5 0.19 200.00 0.35 17.98 200.00 0.51 N 0.32 E 0.6 32.3 0.20 300.00 0.15 320.13 300.00 0.91 N 0.33 E 1.0 20.1 0.29 400.00 0.15 283.80 400.00 1.04 N 0.12 E 1.0 6.6 0.09 500.00 0.29 355.02 500.00 1.33 N 0.03 W 1.3 358.8 0.28 600.00 0.25 77.81 600.00 1.63 N 0.16 E 1.6 5.7 0.36 700.00 0.34 133.77 699.99 1.47 N 0.59 E 1.6 21.8 0.29 800.00 0.61 157.85 799.99 0.77 N 1.00 E 1.3 52.4 0.33 900.00 0.74 138.64 899.98 0.21 S 1.63 E 1.6 97.2 0.26 1000.00 1.24 266.91 999.98 0.75 S 0.98 E 1.2 127.5 1.80 1100.00 3.51 270.94 1099.88 0.76 S 3.16 W 3.3 256.5 2.27 1200.00 4.74 260.13 1199.63 1.42 S 10.29 W 10.4 262.2 1.45 1300.00 4.66 246.76 1299.29 3.73 S 18.09 W 18.5 258.4 1.09 1400.00 10.37 243.27 1398.39 9.38 S 29.87 W 31.3 252.6 5.73 1425.00 12.36 247.68 1422.90 11.41 S 34.35 W 36.2 251.6 8.68 1450.00 13.69 251.93 1447.26 13.34 S 39.64 W 41.8 251.4 6.55 1475.00 14.11 253.58 1471.53 15.12 S 45.38 W 47.8 251.6 2.31 1500.00 14.14 254.25 1495.77 16.81 S 51.24 W 53.9 251.8 0.66 1525.00 14.13 254.63 1520.01 18.45 S 57.12 W 60.0 252.1 0.37 1550.00 13.79 255.00 1544.28 20.03 S 62.94 W 66.1 252.3 1.41 1575.00 13.30 255.79 1568.58 21.51 S 68.60 W 71.9 252.6 2.10 1600.00 13.14 256.20 1592.92 22.89 S 74.15 W 77.6 252.8 0.74 1625.00 13.23 256.38 1617.26 24.24 5 79.69 W 83.3 253.1 0.40 1650.00 13.52 257.44 1641.58 25.55 S 85.32 W 89.1 253.3 1.52 1675.00 14.75 260.28 1665.82 26.73 S 91.31 W 95.1 253.7 5.65 1700.00 15.45 261.65 1689.96 27.75 S 97.75 W 101.6 254.2 3.14 1725.00 15.66 262.32 1714.05 28.68 5 104.38 W 108.3 254.6 1.11 1750.00 15.67 262.38 1738.12 29.58 5 111.07 W 114.9 255.1 0.08 1775.00 15.53 262.53 1762.20 30.46 S 117.74 W 121.6 255.5 0.58 1800.00 14.77 263.34 1786.33 31.27 S 124.22 W 128.1 255.9 3.16 1825.00 14.15 263.58 1810.53 31.98 S 130.43 W 134.3 256.2 2.49 1850.00 14.08 263.35 1834.78 32.67 S 136.48 W 140.3 256.5 0.36 1875.00 14.19 262.95 1859.02 33.40 5 142.54 W 146.4 256.8 0.59 1900.00 14.40 261.88 1883.25 34.22 S 148.66 W 152.5 257.0 1.35 3 OF 14 AK1016GCM142 • • 1 gyro 4 ata A Gyrodata Directional Survey BP Exploration (Alaska) Inc. Lease: Drill Site 03 Well; 03-24A Location: Wellhead, Prudhoe Bay Unit Job Number: AK1016GCM142 MEASURED INCL AZIMUTH VERTICAL HORIZONTAL CLOSURE DOGLEG DEPTH DEPTH COORDINATES DIST. AZIMUTH SEVERITY feet deg. deg. feet feet feet deg. deg./ 100 ft. 1925.00 14.70 261.01 1907.45 35.15 S 154.87 W 158.8 257.2 1.48 1950.00 15.36 260.67 1931.59 36.18 S 161.27 W 165.3 257.4 2.66 1975.00 16.86 260.70 1955.61 37.31 S 168.12 W 172.2 257.5 6.00 2000.00 17.95 261.05 1979.46 38.49 S 175.50 W 179.7 257.6 4.38 2025.00 19.08 261.56 2003.17 39.69 S 183.35 W 187.6 257.8 4.57 2050.00 19.67 262.70 2026.75 40.82 S 191.56 W 195.9 258.0 2.80 2075.00 20.21 264.55 2050.26 41.77 S 200.04 W 204.4 258.2 3.32 2100.00 20.74 265.94 2073.68 42.49 S 208.75 W 213.0 258.5 2.88 2125.00 21.45 267.26 2097.00 43.02 S 217.73 W 221.9 258.8 3.42 2150.00 21.89 267.97 2120.23 43.41 S 226.96 W 231.1 259.2 2.05 2175.00 22.50 268.62 2143.38 43.69 S 236.40 W 240.4 259.5 2.63 2200.00 23.22 268.71 2166.42 43.91 S 246.11 W 250.0 259.9 2.88 2225.00 23.75 268.47 2189.35 44.16 S 256.07 W 259.8 260.2 2.15 2250.00 24.54 267.54 2212.16 44.52 S 266.28 W 270.0 260.5 3.51 ' 2275.00 25.35 266.66 2234.83 45.05 S 276.81 W 280.5 260.8 3.56 2300.00 26.10 265.81 2257.35 45.77 S 287.64 W 291.3 261.0 3.34 2325.00 26.73 265.20 2279.74 46.64 S 298.73 W 302.3 261.1 2.74 2350.00 27.36 264.62 2302.01 47.65 S 310.05 W 313.7 261.3 2.73 2375.00 27.98 264.19 2324.15 48.78 S 321.61 W 325.3 261.4 2.61 2400.00 28.52 264.07 2346.17 49.99 S 333.38 W 337.1 261.5 2.17 2425.00 29.58 263.99 2368.02 51.25 S 345.45 W 349.2 261.6 4.24 2450.00 30.48 263.87 2389.67 52.58 S 357.89 W 361.7 261.6 3.61 2475.00 31.38 263.71 2411.11 53.97 S 370.66 W 374.6 261.7 3.61 2500.00 32.52 263.47 2432.32 55.44 S 383.81 W 387.8 261.8 4.59 2525.00 33.16 263.45 2453.33 56.99 S 397.28 W 401.3 261.8 2.56 2550.00 34.00 263.33 2474.16 58.58 S 411.02 W 415.2 261.9 3.37 2575.00 34.91 263.07 2494.77 60.25 S 425.06 W 429.3 261.9 3.69 2600.00 35.60 263.05 2515.18 62.00 S 439.38 W 443.7 262.0 2.76 2625.00 36.23 262.92 2535.43 63.79 S 453.94 W 458.4 262.0 2.54 2650.00 36.91 263.11 2555.51 65.60 S 468.72 W 473.3 262.0 2.76 2675.00 37.63 263.18 2575.40 67.41 S 483.75 W 488.4 262.1 2.88 2700.00 38.78 263.45 2595.05 69.21 S 499.11 W 503.9 262.1 4.65 2725.00 40.08 264.22 2614.36 70.91 S 514.90 W 519.8 262.2 5.56 2750.00 41.01 264.41 2633.36 72.52 S 531.07 W 536.0 262.2 3.75 2775.00 41.65 264.41 2652.13 74.13 S 547.50 W 552.5 262.3 2.56 2800.00 42.07 264.39 2670.75 75.76 S 564.10 W 569.2 262.4 1.68 2825.00 43.29 264.20 2689.13 77.44 S 580.97 W 586.1 262.4 4.91 2850.00 44.02 264.23 2707.21 79.18 S 598.14 W 603.4 262.5 2.92 2875.00 45.16 264.39 2725.02 80.92 S 615.60 W 620.9 262.5 4.58 . 2900.00 45.92 264.57 2742.53 82.64 S 633.36 W 638.7 262.6 3.08 ' 4 OF 14 AK1016GCM142 • • gyrodata ' A Gyrodata Directional Survey - BP Exploration (Alaska) Inc. Lease: Drill Site 03 Well: 03-24A Location: Wellhead, Prudhoe Bay Unit Job Number: AK1016GCM142 MEASURED INCL AZIMUTH VERTICAL HORIZONTAL CLOSURE DOGLEG DEPTH DEPTH COORDINATES DIST. AZIMUTH SEVERITY feet deg. deg. feet feet feet deg. deg./ 100 ft. 2925.00 46.73 264.86 2759.79 84.30 S 651.37 W 656.8 262.6 3.35 2950.00 47.88 265.42 2776.74 85.86 S 669.67 W 675.2 262.7 4.89 2975.00 48.37 265.77 2793.43 87.29 S 688.23 W 693.7 262.8 2.22 3000.00 49.10 266.45 2809.92 88.56 S 706.98 W 712.5 262.9 3.56 3025.00 49.72 266.58 2826.19 89.72 S 725.93 W 731.5 263.0 2.51 3050.00 50.53 266.70 2842.21 90.84 S 745.08 W 750.6 263.0 3.26 3075.00 51.35 266.91 2857.97 91.92 S 764.47 W 770.0 263.1 3.34 3100.00 51.75 267.04 2873.51 92.95 S 784.02 W 789.5 263.2 1.65 3125.00 52.13 267.27 2888.93 93.93 S 803.68 W 809.1 263.3 1.68 3150.00 52.33 267.34 2904.24 94.86 S 823.42 W 828.9 263.4 0.83 3175.00 52.53 267.40 2919.48 95.77 S 843.21 W 848.6 263.5 0.82 3200.00 52.63 267.54 2934.67 96.65 S 863.05 W 868.4 263.6 0.60 3225.00 52.70 267.62 2949.83 97.49 S 882.91 W 888.3 263.7 0.38 ' 3250.00 52.90 267.60 2964.95 98.32 S 902.80 W 908.1 263.8 0.80 3275.00 53.09 267.65 2980.00 99.14 S 922.75 W 928.1 263.9 0.78 3300.00 53.06 267.63 2995.02 99.97 S 942.72 W 948.0 263.9 0.14 3325.00 53.02 267.65 3010.05 100.79 S 962.68 W 967.9 264.0 0.17 3350.00 53.04 267.69 3025.08 101.60 S 982.64 W 987.9 264.1 0.15 3375.00 53.12 267.76 3040.10 102.39 S 1002.61 W 1007.8 264.2 0.39 3400.00 53.19 267.82 3055.09 103.17 S 1022.60 W 1027.8 264.2 0.34 3425.00 53.37 267.85 3070.04 103.92 S 1042.62 W 1047.8 264.3 0.73 3450.00 53.59 267.87 3084.92 104.67 S 1062.70 W 1067.8 264.4 0.88 3475.00 53.80 267.93 3099.72 105.41 S 1082.83 W 1088.0 264.4 0.86 3500.00 54.01 267.93 3114.45 106.14 S 1103.02 W 1108.1 264.5 0.84 3525.00 54.24 268.02 3129.10 106.86 S 1123.27 W 1128.3 264.6 0.97 3550.00 54.55 268.14 3143.65 107.54 S 1143.58 W 1148.6 264.6 1.30 3575.00 54.77 268.26 3158.11 108.18 S 1163.96 W 1169.0 264.7 0.96 3600.00 54.98 268.28 3172.50 108.80 S 1184.40 W 1189.4 264.8 0.84 3625.00 55.17 268.38 3186.81 109.39 S 1204.89 W 1209.8 264.8 0.83 3650.00 55.32 268.42 3201.06 109.97 S 1225.42 W 1230.3 264.9 0.61 3675.00 55.44 268.55 3215.26 110.51 S 1245.99 W 1250.9 264.9 0.64 3700.00 55.43 268.68 3229.45 111.01 S 1266.57 W 1271.4 265.0 0.43 3725.00 55.47 268.74 3243.63 111.47 S 1287.16 W 1292.0 265.1 0.25 3750.00 55.48 268.81 3257.79 111.91 S 1307.75 W 1312.5 265.1 0.23 3775.00 55.62 268.81 3271.94 112.34 S 1328.36 W 1333.1 265.2 0.56 3800.00 55.69 268.82 3286.04 112.77 S 1349.00 W 1353.7 265.2 0.28 3825.00 55.76 268.80 3300.12 113.20 S 1369.65 W 1374.3 265.3 0.29 3850.00 55.94 268.82 3314.15 113.63 S 1390.34 W 1395.0 265.3 0.72 3875.00 55.97 268.86 3328.15 114.04 S 1411.05 W 1415.6 265.4 0.18 3900.00 55.94 268.89 3342.15 114.45 S 1431.76 W 1436.3 265.4 0.16 • 5 OF 14 AK1016GCM142 • • - A Gyrodata Directional Survey BP Exploration (Alaska) Inc. Lease: Drill Site 03 Well: 03-24A Location: Wellhead, Prudhoe Bay Unit Job Number: AK1016GCM142 MEASURED INCL AZIMUTH VERTICAL HORIZONTAL CLOSURE DOGLEG DEPTH DEPTH COORDINATES DIST. AZIMUTH SEVERITY feet deg. deg. feet feet feet deg. deg./ 100 ft. 3925.00 56.05 268.95 3356.13 114.84 S 1452.48 W 1457.0 265.5 0.48 3950.00 56.10 269.00 3370.08 115.21 S 1473.22 W 1477.7 265.5 0.26 3975.00 56.24 269.03 3384.00 115.57 S 1493.98 W 1498.4 265.6 0.57 4000.00 56.25 269.15 3397.89 115.90 S 1514.77 W 1519.2 265.6 0,40 4025.00 56.31 269.21 3411.77 116.20 S 1535.56 W 1539.9 265.7 0.31 4050.00 56.27 269.34 3425.64 116.46 S 1556.35 W 1560.7 265.7 0.46 4075.00 56.44 269.35 3439.49 116.70 S 1577.16 W 1581.5 265.8 0.68 4100.00 56.52 269.36 3453.30 116.93 S 1598.00 W 1602.3 265.8 0.32 4125.00 56.64 269.36 3467.07 117.17 S 1618.87 W 1623.1 265.9 0.48 4150.00 56.62 269.40 3480.82 117.39 S 1639.75 W 1643.9 265.9 0.16 4175.00 56.49 269.42 3494.60 117.61 S 1660.61 W 1664.8 265.9 0.52 4200.00 56.70 269.43 3508.36 117.82 S 1681.47 W 1685.6 266.0 0.84 • 4225.00 56.88 269.42 3522.06 118.03 S 1702.39 W 1706.5 266.0 0.72 4250.00 56.77 269.51 3535.74 118.22 S 1723.31 W 1727.4 266.1 0.53 4275.00 56.75 269.50 3549.44 118.40 S 1744.22 W 1748.2 266.1 0.09 4300.00 56.81 269.54 3563.14 118.58 S 1765.14 W 1769.1 266.2 0.27 4325.00 56.69 269.62 3576.84 118.73 S 1786.04 W 1790.0 266.2 0.55 4350.00 56.86 269.64 3590.54 118.87 S 1806.96 W 1810.9 266.2 0.68 4375.00 57.01 269.63 3604.18 119.00 S 1827.91 W 1831.8 266.3 0.60 4400.00 56.90 269.58 3617.81 119.14 S 1848.86 W 1852.7 266.3 0.47 4425.00 57.06 269.58 3631.44 119.30 5 1869.82 W 1873.6 266.3 0.64 4450.00 56.85 269.62 3645.07 119.44 S 1890.78 W 1894.5 266.4 0.85 4475.00 56.67 269.70 3658.77 119.57 S 1911.69 W 1915.4 266.4 0.77 4500.00 56.65 269.79 3672.51 119.66 S 1932.57 W 1936.3 266.5 0.31 4525.00 56.68 269.76 3686.25 119.74 S 1953.46 W 1957.1 266.5 0.16 4550.00 56.24 269.81 3700.06 119.82 S 1974.30 W 1977.9 266.5 1.77 4575.00 55.98 269.83 3714.00 119.89 S 1995.05 W 1998.6 266.6 1.04 4600.00 55.52 269.96 3728.07 119.92 S 2015.72 W 2019.3 266.6 1.89 4625.00 55.57 269.95 3742.22 119.94 S 2036.33 W 2039.9 266.6 0.20 4650.00 55.59 269.99 3756.35 119.95 S 2056.95 W 2060.4 266.7 0.15 4675.00 55.71 269.97 3770.46 119.96 S 2077.59 W 2081.1 266.7 0.48 4700.00 55.85 269.96 3784.51 119.97 S 2098.26 W 2101.7 266.7 0.56 4725.00 55.87 269.95 3798.55 119.99 S 2118.96 W 2122.4 266.8 0.09 4750.00 55.89 269.94 3812.57 120.01 S 2139.65 W 2143.0 266.8 0.09 4775.00 56.11 269.95 3826.55 120.03 S 2160.38 W 2163.7 266.8 0.88 4800.00 56.30 269.93 3840.45 120.05 S 2181.15 W 2184.5 266.8 0.76 4825.00 56.10 270.00 3854.36 120.06 S 2201.93 W 2205.2 266.9 0.83 4850.00 55.95 270.07 3868.33 120.05 S 2222.66 W 2225.9 266.9 0.64 4875.00 55.77 270.08 3882.36 120.02 S 2243.35 W 2246.6 266.9 0.72 • 6 OF 14 AK1016GCM142 • i gyrodata 4900.00 55.90 270.11 3896.40 119.99 S 2264.04 W 2267.2 267.0 0.53 A Gyrodata Directional Survey BP Exploration (Alaska) Inc. Lease: Drill Site 03 Well: 03-24A Location: Wellhead, Prudhoe Bay Unit Job Number: AK1016GCM142 MEASURED INCL AZIMUTH VERTICAL HORIZONTAL CLOSURE DOGLEG DEPTH DEPTH COORDINATES DIST. AZIMUTH SEVERITY feet deg. deg. feet feet feet deg. deg./ 100 ft. 4925.00 56.13 270.08 3910.38 119.95 S 2284.77 W 2287.9 267.0 0.93 4950.00 56.25 270.10 3924.29 119.92 S 2305.54 W 2308.7 267.0 0.48 4975.00 56.04 270.06 3938.21 119.89 S 2326.30 W 2329.4 267.0 0.85 5000.00 55.95 270.05 3952.20 119.87 S 2347.03 W 2350.1 267.1 0.36 5025.00 55.93 270.00 3966.20 119.86 S 2367.74 W 2370.8 267.1 0.18 5050.00 55.79 270.02 3980.23 119.86 S 2388.43 W 2391.4 267.1 0.56 5075.00 55.67 270.06 3994.31 119.84 S 2409.09 W 2412.1 267.2 0.50 5100.00 55.81 270.07 4008.38 119.82 S 2429.75 W 2432.7 267.2 0.56 5125.00 55.96 270.08 4022.40 119.79 S 2450.45 W 2453.4 267.2 0.60 5150.00 56.08 270.10 4036.37 119.76 S 2471.18 W 2474.1 267.2 0.48 5175.00 56.04 270.10 4050.33 119.73 S 2491.92 W 2494.8 267.2 0.16 • 5200.00 55.85 270.09 4064.33 119.69 S 2512.63 W 2515.5 267.3 0.76 5225.00 55.88 270.11 4078.36 119.66 S 2533.33 W 2536.2 267.3 0.14 5250.00 55.99 270.14 4092.36 119.61 S 2554.04 W 2556.8 267.3 0.45 • 5275.00 55.95 270.13 4106.35 119.56 S 2574.75 W 2577.5 267.3 0.16 5300.00 56.02 270.14 4120.34 119.51 5 2595.48 W 2598.2 267.4 0.28 5325.00 55.93 270.12 4134.33 119.47 S 2616.20 W 2618.9 267.4 0.37 5350.00 55.88 270.03 4148.34 119.44 5 2636.90 W 2639.6 267.4 0.36 5375.00 55.72 269.89 4162.39 119.45 5 2657.58 W 2660.3 267.4 0.79 5400.00 55.93 269.89 4176.44 119.49 S 2678.26 W 2680.9 267.4 0.84 5425.00 56.22 269.89 4190.39 119.53 S 2699.00 W 2701.6 267.5 1.16 5450.00 56.45 269.89 4204.25 119.57 S 2719.81 W 2722.4 267.5 0.92 5475.00 56.72 269.87 4218.02 119.62 S 2740.68 W 2743.3 267.5 1.08 5500.00 56.88 269.87 4231.70 119.66 S 2761.60 W 2764.2 267.5 0.64 5525.00 56.46 269.78 4245.44 119.73 S 2782.49 W 2785.1 267.5 1.71 5550.00 56.38 269.75 4259.27 119.81 S 2803.31 W 2805.9 267.6 0.34 5575.00 56.33 269.71 4273.12 119.91 S 2824.12 W 2826.7 267.6 0.24 5600.00 56.35 269.71 4286.98 120.02 S 2844.93 W 2847.5 267.6 0.08 5625.00 56.37 269.67 4300.83 120.13 S 2865.75 W 2868.3 267.6 0.16 5650.00 56.32 269.64 4314.68 120.25 S 2886.56 W 2889.1 267.6 0.22 5675.00 56.40 269.67 4328.53 120.38 5 2907.37 W 2909.9 267.6 0.34 5700.00 55.97 269.65 4342.44 120.50 S 2928.14 W 2930.6 267.6 1.72 5725.00 56.03 269.66 4356.42 120.63 S 2948.86 W 2951.3 267.7 0.24 5750.00 55.92 269.65 4370.41 120.75 S 2969.58 W 2972.0 267.7 0.44 5775.00 55.56 269.69 4384.48 120.87 S 2990.25 W 2992.7 267.7 1.45 5800.00 55.56 269.68 4398.62 120.98 S 3010.86 W 3013.3 267.7 0.03 5825.00 55.46 269.66 4412.78 121.10 S 3031.47 W 3033.9 267.7 0.41 5850.00 55.46 269.67 4426.95 121.22 S 3052.06 W 3054.5 267.7 0.03 • 7 OF 14 AK1016GCM142 • 0 r a 5875.00 55.59 269.67 4441.11 121.34 S 3072.67 W 3075.1 267.7 0.52 ' 5900.00 55.27 269.66 4455.29 121.46 S 3093.26 W 3095.6 267.8 1.28 A Gyrodata Directional Survey BP Exploration (Alaska) Inc. Lease: Drill Site 03 Well: 03-24A Location: Wellhead, Prudhoe Bay Unit Job Number: AK1016GCM142 MEASURED INCL AZIMUTH VERTICAL HORIZONTAL CLOSURE DOGLEG DEPTH DEPTH COORDINATES DIST. AZIMUTH SEVERITY feet deg. deg. feet feet feet deg. deg./ 100 ft. 5925.00 55.11 269.66 4469.56 121.58 S 3113.78 W 3116.2 267.8 0.64 5950.00 54.83 269.65 4483.91 121.71 S 3134.25 W 3136.6 267.8 1.12 5975.00 54.90 269.64 4498.30 121.83 S 3154.70 W 3157.0 267.8 0.28 6000.00 54.71 269.61 4512.71 121.97 S 3175.13 W 3177.5 267.8 0.77 6025.00 54.06 269.57 4527.27 122.11 S 3195.45 W 3197.8 267.8 2.60 6050.00 54.01 269.57 4541.95 122.27 S 3215.68 W 3218.0 267.8 0.20 6075.00 53.64 269.55 4556.71 122.42 S 3235.86 W 3238.2 267.8 1.48 6100.00 53.30 269.52 4571.59 122.58 S 3255.95 W 3258.3 267.8 1.36 6125.00 53.35 269.51 4586.52 122.75 S 3276.00 W 3278.3 267.9 0.20 6150.00 53.35 269.48 4601.44 122.93 S 3296.06 W 3298.4 267.9 0.10 ' 6175.00 53.18 269.49 4616.40 123.11 S 3316.09 W 3318.4 267.9 0.68 6200.00 52.89 269.48 4631.43 123.29 S 3336.07 W 3338.3 267.9 1.16 6225.00 52.65 269.59 4646.55 123.45 S 3355.97 W 3358.2 267.9 1.02 6250.00 51.81 269.69 4661.87 123.57 S 3375.73 W 3378.0 267.9 3.37 6275.00 51.11 269.67 4677.44 123.68 S 3395.29 W 3397.5 267.9 2.80 6300.00 50.83 269.81 4693.19 123.77 S 3414.71 W 3416.9 267.9 1.20 6325.00 50.95 269.95 4708.96 123.81 S 3434.11 W 3436.3 267.9 0.65 6350.00 51.03 270.15 4724.69 123.80 S 3453.53 W 3455.7 267.9 0.70 6375.00 51.26 270.16 4740.38 123.74 S 3473.00 W 3475.2 268.0 0.92 6400.00 51.06 270.24 4756.05 123.68 S 3492.47 W 3494.7 268.0 0.84 6425.00 51.05 270.31 4771.77 123.58 S 3511.92 W 3514.1 268.0 0.22 6450.00 50.94 270.39 4787.50 123.46 S 3531.34 W 3533.5 268.0 0.51 6475.00 50.69 270.52 4803.30 123.31 S 3550.72 W 3552.9 268.0 1.08 6500.00 50.82 270.63 4819.12 123.12 S 3570.08 W 3572.2 268.0 0.62 6525.00 51.02 270.66 4834.88 122.90 S 3589.49 W 3591.6 268.0 0.81 6550.00 50.86 270.90 4850.63 122.63 S 3608.90 W 3611.0 268.1 0.98 6575.00 50.67 270.99 4866.44 122.31 S 3628.26 W 3630.3 268.1 0.81 6600.00 50.33 271.11 4882.34 121.96 S 3647.54 W 3649.6 268.1 1.41 6625.00 50.53 271.17 4898.27 121.58 S 3666.81 W 3668.8 268.1 0.82 6650.00 50.13 271.25 4914.23 121.17 S 3686.05 W 3688.0 268.1 1.62 6675.00 49.98 271.33 4930.28 120.74 S 3705.21 W 3707.2 268.1 0.65 6700.00 50.13 271.41 4946.33 120.28 S 3724.37 W 3726.3 268.2 0.65 6725.00 50.11 271.67 4962.36 119.76 S 3743.55 W 3745.5 268.2 0.80 6750.00 50.21 271.79 4978.38 119.19 S 3762.74 W 3764.6 268.2 0.54 6775.00 50.33 271.83 4994.36 118.58 S 3781.96 W 3783.8 268.2 0.50 6800.00 50.40 271.85 5010.30 117.96 S 3801.20 W 3803.0 268.2 0.29 6825.00 50.27 271.95 5026.26 117.32 S 3820.43 W 3822.2 268.2 0.60 • 8 OF 14 AK1016GCM142 • • gymdata 6850.00 50.28 272.02 5042.24 116.66 S 3839.65 W 3841.4 268.3 0.22 - 6875.00 50.07 272.09 5058.25 115.97 S 3858.84 W 3860.6 268.3 0.87 - 6900.00 50.30 272.10 5074.26 115.27 S 3878.03 W 3879.7 268.3 0.92 A Gyrodata Directional Survey BP Exploration (Alaska) Inc. Lease: Drill Site 03 Well: 03-24A Location: Wellhead, Prudhoe Bay Unit Job Number: AK1016GCM142 MEASURED INCL AZIMUTH VERTICAL HORIZONTAL CLOSURE DOGLEG DEPTH DEPTH COORDINATES DIST. AZIMUTH SEVERITY feet deg. deg. feet feet feet deg. deg./ 100 ft. 6925.00 50.19 272.24 5090.24 114.54 S 3897.23 W 3898.9 268.3 0.62 6950.00 50.27 272.30 5106.24 113.78 S 3916.43 W 3918.1 268.3 0.37 6975.00 50.05 272.51 5122.25 112.97 S 3935.61 W 3937.2 268.4 1.09 7000.00 49.79 272.66 5138.35 112.11 S 3954.72 W 3956.3 268.4 1.14 7025.00 49.89 272.71 5154.47 111.21 S 3973.81 W 3975.4 268.4 0.43 7050.00 49.77 272.79 5170.60 110.30 S 3992.89 W 3994.4 268.4 0.54 7075.00 50.00 272.76 5186.71 109.37 S 4011.98 W 4013.5 268.4 0.92 7100.00 50.20 272.83 5202.74 108.44 S 4031.14 W 4032.6 268.5 0.83 7125.00 49.95 273.06 5218.79 107.45 S 4050.29 W 4051.7 268.5 1.22 7150.00 49.85 273.17 5234.89 106.41 S 4069.38 W 4070.8 268.5 0.52 7175.00 49.74 273.26 5251.03 105.34 S 4088.45 W 4089.8 268.5 0.52 7200.00 49.81 273.35 5267.17 104.24 S 4107.50 W 4108.8 268.5 0.39 7225.00 50.08 273.40 5283.26 103.11 S 4126.60 W 4127.9 268.6 1.09 7250.00 50.27 273.50 5299.27 101.96 S 4145.77 W 4147.0 268.6 0.82 7275.00 50.37 273.79 5315.24 100.74 S 4164.97 W 4166.2 268.6 0.98 7300.00 50.62 273.89 5331.14 99.44 S 4184.22 W 4185.4 268.6 1.05 7325.00 50.65 273.97 5347.00 98.12 S 4203.50 W 4204,6 268.7 0.27 7350.00 50.49 274.03 5362.87 96.77 S 4222.76 W 4223.9 268.7 0.67 7375.00 50.69 274.05 5378.75 95.41 S 4242.03 W 4243.1 268.7 0.80 7400.00 50.60 274.08 5394.60 94.04 S 4261.31 W 4262.3 268.7 0.37 7425.00 50.71 274.19 5410.45 92.65 S 4280.60 W 4281.6 268.8 0.56 7450.00 50.74 274.18 5426.27 91.23 S 4299.90 W 4300.9 268.8 0.12 7475.00 50.96 274.14 5442.06 89.83 S 4319.23 W 4320.2 268.8 0.89 7500.00 51.25 274.19 5457.76 88.41 S 4338.64 W 4339.5 268.8 1.17 7525.00 50.92 274.38 5473.46 86.96 S 4358.04 W 4358.9 268.9 1.45 7550.00 50.85 274.49 5489.23 85.46 S 4377.38 W 4378.2 268.9 0.44 7575.00 50.64 274.56 5505.05 83.93 S 4396.67 W 4397.5 268.9 0.87 7600.00 50.70 274.60 5520.90 82.39 S 4415.95 W 4416.7 268.9 0.27 7625.00 50.54 274.70 5536.76 80.82 S 4435.21 W 4435.9 269.0 0.71 7650.00 50.82 274.75 5552.60 79.23 S 4454.48 W 4455.2 269.0 1.13 7675.00 51.14 274.72 5568.34 77.63 S 4473.84 W 4474.5 269.0 1.28 7700.00 51.24 274.91 5584.01 75.99 S 4493.25 W 4493.9 269.0 0.71 7725.00 51.29 274.95 5599.65 74.32 S 4512.68 W 4513.3 269.1 0.24 7750.00 51.44 275.10 5615.26 72.61 S 4532.14 W 4532.7 269.1 0.76 7775.00 51.51 275.15 5630.83 70.86 S 4551.62 W 4552.2 269.1 0.32 7800.00 51.65 275.16 5646.37 69.10 5 4571.12 W 4571.6 269.1 0.56 • 9 OF 14 AK1016GCM142 • • gyrodata 7825.00 51.43 275.26 5661.91 67.32 S 4590.62 W 4591.1 269.2 0.93 7850.00 51.71 275.36 5677.45 65.51 S 4610.12 W 4610.6 269.2 1.16 7875.00 51.91 275.44 5692.91 63.66 S 4629.68 W 4630.1 269.2 0.84 7900.00 51.66 275.76 5708.38 61.74 S 4649.23 W 4649.6 269.2 1.42 A Gyrodata Directional Survey BP Exploration (Alaska) Inc. Lease: Drill Site 03 Well: 03-24A Location: Wellhead, Prudhoe Bay Unit Job Number: AK1016GCM142 MEASURED INCL AZIMUTH VERTICAL HORIZONTAL CLOSURE DOGLEG DEPTH DEPTH COORDINATES DIST. AZIMUTH SEVERITY feet deg. deg. feet feet feet deg. deg./ 100 ft. 7925.00 52.03 275.75 5723.82 59.77 S 4668.79 W 4669.2 269.3 1.48 7950.00 52.22 275.99 5739.17 57.75 S 4688.42 W 4688.8 269.3 1.07 7975.00 52.18 276.17 5754.49 55.66 S 4708.06 W 4708.4 269.3 0.59 8000.00 52.32 276.25 5769.80 53.52 S 4727.71 W 4728.0 269.4 0.61 8025.00 52.45 276.27 5785.06 51.36 S 4747.40 W 4747.7 269.4 0.52 8050.00 52.55 276.32 5800.28 49.19 S 4767.11 W 4767.4 269.4 0.43 8075.00 52.55 276.38 5815.48 46.99 S 4786.84 W 4787.1 269.4 0.19 8100.00 52.41 276.38 5830.70 44.79 S 4806.54 W 4806.8 269.5 0.56 8125.00 52.16 276.41 5846.00 42.59 S 4826.20 W 4826.4 269.5 1.00 8150.00 52.23 276.37 5861.32 40.39 S 4845.83 W 4846.0 269.5 0.31 8175.00 52.37 276.26 5876.61 38.21 S 4865.49 W 4865.6 269.6 0.66 8200.00 52.84 276.20 5891.79 36.06 S 4885.23 W 4885.4 269.6 1.89 8225.00 53.23 275.68 5906.82 33.99 S 4905.10 W 4905.2 269.6 2.28 8250.00 53.68 275.53 5921.71 32.03 S 4925.09 W 4925.2 269.6 1.86 8275.00 53.68 275.47 5936.52 30.10 S 4945.14 W 4945.2 269.7 0.19 8300.00 53.82 275.45 5951.30 28.18 S 4965.21 W 4965.3 269.7 0.56 8325.00 53.79 275.53 5966.06 26.25 S 4985.29 W 4985.4 269.7 0.28 8350.00 53.84 275.69 5980.82 24.28 S 5005.37 W 5005.4 269.7 0.55 8375.00 53.68 275.66 5995.60 22.28 S 5025.44 W 5025.5 269.7 0.65 8400.00 53.47 275.60 6010.45 20.31 S 5045.46 W 5045.5 269.8 0.86 8425.00 53.86 275.55 6025.26 18.35 S 5065.50 W 5065.5 269.8 1.57 8450.00 54.07 275.06 6039.97 16.48 S 5085.63 W 5085.7 269.8 1.79 8475.00 53.86 273.31 6054.68 15.01 S 5105.79 W 5105.8 269.8 5.72 8500.00 53.56 271.39 6069.47 14.18 S 5125.92 W 5125.9 269.8 6.31 8525.00 53.49 269.62 6084.34 14.00 S 5146.02 W 5146.0 269.8 5.70 8550.00 53.76 268.18 6099.16 14.39 S 5166.15 W 5166.2 269.8 4.76 8575.00 54.14 267.31 6113.88 15.19 S 5186.34 W 5186.4 269.8 3.20 8600.00 54.40 267.18 6128.47 16.16 S 5206.62 W 5206.6 269.8 1.12 8625.00 54.61 267.11 6142.99 17.18 S 5226.94 W 5227.0 269.8 0.87 8650.00 54.49 267.16 6157.49 18.19 S 5247.28 W 5247.3 269.8 0.51 8675.00 54.53 267.18 6172.00 19.20 S 5267.61 W 5267.6 269.8 0.17 8700.00 54.39 267.13 6186.54 20.21 S 5287.93 W 5288.0 269.8 0.58 8725.00 54.31 267.08 6201.11 21.24 S 5308.22 W 5308.3 269.8 0.36 8750.00 54.16 267.04 6215.72 22.28 S 5328.48 W 5328.5 269.8 0.61 8775.00 54.23 267.00 6230.34 23.33 S 5348.73 W 5348.8 269.8 0.31 • 10 OF 14 AK1016GCM142 • 0 yro 8800.00 54.10 266.88 6244.98 24.41 S 5368.97 W 5369.0 269.7 0.65 8825.00 53.82 266.96 6259.69 25.50 S 5389.15 W 5389.2 269.7 1.15 8850.00 53.87 266.94 6274.44 26.57 S 5409.31 W 5409.4 269.7 0.21 8875.00 53.96 266.90 6289.16 27.66 S 5429.48 W 5429.6 269.7 0.38 8900.00 53.96 266.99 6303.87 28.73 S 5449.67 W 5449.7 269.7 0.29 A Gyrodata Directional Survey BP Exploration (Alaska) Inc. Lease: Drill Site 03 Well: 03-24A Location: Wellhead, Prudhoe Bay Unit Job Number: AK1016GCM142 MEASURED INCL AZIMUTH VERTICAL HORIZONTAL CLOSURE DOGLEG DEPTH DEPTH COORDINATES DIST. AZIMUTH SEVERITY feet deg. deg. feet feet feet deg. deg./ 100 ft. 8925.00 53.81 267.07 6318.61 29.78 S 5469.84 W 5469.9 269.7 0.65 8950.00 53.73 267.08 6333.38 30.81 S 5489.98 W 5490.1 269.7 0.32 8975.00 53.84 267.04 6348.15 31.84 S 5510.12 W 5510.2 269.7 0.46 9000.00 53.95 267.05 6362.88 32.89 S 5530.29 W 5530.4 269.7 0.44 9025.00 53.77 266.96 6377.63 33.94 S 5550.46 W 5550.6 269.6 0.78 9050.00 53.84 266.97 6392.39 35.01 S 5570.60 W 5570.7 269.6 0.28 9075.00 53.95 266.94 6407.12 36.08 S 5590.77 W 5590.9 269.6 0.45 9100.00 54.11 266.95 6421.81 37.16 S 5610.98 W 5611.1 269.6 0.64 9125.00 54.03 266.91 6436.48 38.24 S 5631.19 W 5631.3 269.6 0.35 9150.00 54.11 266.89 6451.15 39.34 S 5651.41 W 5651.5 269.6 0.33 9175.00 54.05 267.01 6465.81 40.42 S 5671.62 W 5671.8 269.6 0.46 9200.00 53.92 266.99 6480.51 41.47 S 5691.82 W 5692.0 269.6 0.52 9225.00 54.07 267.02 6495.21 42.53 S 5712.01 W 5712.2 269.6 0.61 9250.00 54.20 267.11 6509.86 43.57 S 5732.25 W 5732.4 269.6 0.60 9275.00 54.15 267.18 6524.49 44.58 S 5752.49 W 5752.7 269.6 0.30 9300.00 54.03 267.19 6539.15 45.57 S 5772.72 W 5772.9 269.5 0.48 9325.00 54.04 267.26 6553.83 46.55 S 5792.93 W 5793.1 269.5 0.23 9350.00 54.32 267.25 6568.47 47.52 5 5813.17 W 5813.4 269.5 1.12 9375.00 54.33 267.23 6583.05 48.50 5 5833.46 W 5833.7 269.5 0.08 9400.00 54.54 267.28 6597.59 49.48 S 5853.77 W 5854.0 269.5 0.86 9425.00 54.57 267.26 6612.08 50.45 S 5874.12 W 5874.3 269.5 0.14 9450.00 54.57 267.28 6626.58 51.42 S 5894.46 W 5894.7 269.5 0.07 9475.00 54.82 267.29 6641.03 52.38 S 5914.84 W 5915.1 269.5 1.00 9500.00 54.94 267.32 6655.41 53.34 S 5935.27 W 5935.5 269.5 0.49 9525.00 55.11 267.35 6669.74 54.30 S 5955.73 W 5956.0 269.5 0.69 9550.00 55.24 267.32 6684.01 55.25 S 5976.23 W 5976.5 269.5 0.53 9575.00 55.24 267.37 6698.27 56.20 S 5996.75 W 5997.0 269.5 0.16 9600.00 55.50 267.36 6712.47 57.15 S 6017.30 W 6017.6 269.5 1.04 9625.00 55.61 267.48 6726.62 58.08 S 6037.89 W 6038.2 269.4 0.59 9650.00 55.78 267.55 6740.71 58.97 S 6058.53 W 6058.8 269.4 0.72 9675.00 55.59 267.68 6754.80 59.83 S 6079.16 W 6079.5 269.4 0.87 9700.00 55.92 267.73 6768.87 60.66 S 6099.81 W 6100.1 269.4 1.33 9725.00 56.26 267.66 6782.81 61.49 S 6120.54 W 6120.8 269.4 1.38 9750.00 55.82 267.69 6796.78 62.33 S 6141.26 W 6141.6 269.4 1.76 9775.00 55.94 267.66 6810.80 63.17 S 6161.94 W 6162.3 269.4 0.49 • 11 OF 14 AK1O16GCM142 0 0 gym data 9800.00 56.13 267.70 6824.77 64.01 S 6182.65 W 6183.0 269.4 0.77 9825.00 55.99 267.79 6838.73 64.83 S 6203.38 W 6203.7 269.4 0.63 9850.00 56.26 267.81 6852.66 65.62 S 6224.12 W 6224.5 269.4 1.08 9875.00 55.90 267.83 6866.61 66.41 S 6244.85 W 6245.2 269.4 1.44 9900.00 55.97 267.85 6880.62 67.19 S 6265.54 W 6265.9 269.4 0.29 A Gyrodata Directional Survey BP Exploration (Alaska) Inc. Lease: Drill Site 03 Well: 03-24A Location: Wellhead, Prudhoe Bay Unit Job Number: AK1016GCM142 MEASURED INCL AZIMUTH VERTICAL HORIZONTAL CLOSURE DOGLEG DEPTH DEPTH COORDINATES DIST. AZIMUTH SEVERITY feet deg. deg. feet feet feet deg. deg./ 100 ft. 9925.00 56.13 267.91 6894.58 67.96 S 6286.27 W 6286.6 269.4 0.67 9950.00 56.13 267.91 6908.51 68.72 S 6307.01 W 6307.4 269.4 0.00 9975.00 55.98 267.98 6922.47 69.46 S 6327.74 W 6328.1 269.4 0.64 10000.00 55.90 268.04 6936.47 70.18 S 6348.44 W 6348.8 269.4 0.38 10025.00 55.91 268.06 6950.49 70.89 S 6369.13 W 6369.5 269.4 0.08 10050.00 55.80 267.97 6964.52 71.60 S 6389.81 W 6390.2 269.4 0.53 10075.00 56.00 267.94 6978.54 72.34 S 6410.49 W 6410.9 269.4 0.81 10100.00 55.96 267.88 6992.52 73.10 S 6431.20 W 6431.6 269.3 0.26 10125.00 56.04 267.81 7006.50 73.88 S 6451.91 W 6452.3 269.3 0.40 10150.00 56.07 267.73 7020.46 74.68 S 6472.64 W 6473.1 269.3 0.29 10175.00 56.06 267.68 7034.42 75.51 S 6493.36 W 6493.8 269.3 0.17 10200.00 56.02 267.61 7048.38 76.37 S 6514.08 W 6514.5 269.3 0.28 10225.00 56.04 267.60 7062.35 77.23 S 6534.79 W 6535.3 269.3 0.09 10250.00 55.90 267.60 7076.34 78.10 S 6555.49 W 6556.0 269.3 0.56 10275.00 56.03 267.54 7090.34 78.98 S 6576.19 W 6576.7 269.3 0.56 10300.00 56.09 267.55 7104.29 79.87 S 6596.92 W 6597.4 269.3 0.24 10325.00 56.02 267.54 7118.25 80.76 S 6617.64 W 6618.1 269.3 0.28 10350.00 56.12 267.46 7132.21 81.66 S 6638.36 W 6638.9 269.3 0.48 10375.00 55.96 267.44 7146.17 82.58 S 6659.07 W 6659.6 269.3 0.64 10400.00 56.01 267.44 7160.16 83.51 S 6679.78 W 6680.3 269.3 0.20 10425.00 56.03 267.46 7174.13 84.43 S 6700.49 W 6701.0 269.3 0.10 10450.00 55.88 267.42 7188.13 85.36 S 6721.18 W 6721.7 269.3 0.61 10475.00 56.10 267.37 7202.11 86.30 S 6741.88 W 6742.4 269.3 0.90 10500.00 55.82 267.35 7216.11 87.25 S 6762.58 W 6763.1 269.3 1.12 10525.00 55.58 267.40 7230.19 88.20 S 6783.21 W 6783.8 269.3 0.97 10550.00 55.32 267.43 7244.37 89.13 S 6803.78 W 6804.4 269.2 1.04 10575.00 55.04 267.50 7258.65 90.03 S 6824.28 W 6824.9 269.2 1.14 10600.00 55.20 267.47 7272.94 90.93 S 6844.77 W 6845.4 269.2 0.65 10625.00 54.96 267.47 7287.25 91.84 S 6865.25 W 6865.9 269.2 0.96 10650.00 55.01 267.46 7301.60 92.74 S 6885.70 W 6886.3 269.2 0.20 10675.00 54.81 267.41 7315.97 93.66 S 6906.14 W 6906.8 269.2 0.82 10700.00 54.89 267.41 7330.36 94.58 S 6926.56 W 6927.2 269.2 0.32 10725.00 54.68 267.44 7344.78 95.50 S 6946.96 W 6947.6 269.2 0.85 10750.00 54.52 267.37 7359.26 96.42 S 6967.32 W 6968.0 269.2 0.68 12 OF 14 AK1016GCM142 • 0 gyrodata 10775.00 54.49 267.44 7373.78 97.35 S 6987.65 W 6988.3 269.2 0.26 • 10800.00 54.33 267.40 7388.33 98.26 S 7007.96 W 7008.7 269.2 0.65 10825.00 54.22 267.36 7402.92 99.19 S 7028.24 W 7028.9 269.2 0.46 10850.00 54.22 267.31 7417.54 100.13 S 7048.50 W 7049.2 269.2 0.16 10875.00 54.02 267.26 7432.19 101.09 S 7068.73 W 7069.5 269.2 0.82 10900.00 53.99 267.29 7446.89 102.05 S 7088.94 W 7089.7 269.2 0.15 A Gyrodata Directional Survey BP Exploration (Alaska) Inc. Lease: Drill Site 03 Well: 03-24A Location: Wellhead, Prudhoe Bay Unit Job Number: AK1016GCM142 MEASURED INCL AZIMUTH VERTICAL HORIZONTAL CLOSURE DOGLEG DEPTH DEPTH COORDINATES DIST. AZIMUTH SEVERITY feet deg. deg. feet feet feet deg. deg./ 100 ft. 10925.00 53.88 267.28 7461.60 103.01 S 7109.12 W 7109.9 269.2 0.44 10950.00 53.68 267.27 7476.38 103.97 S 7129.27 W 7130.0 269.2 0.80 10975.00 53.79 267.33 7491.16 104.92 S 7149.40 W 7150.2 269.2 0.48 11000.00 53.71 267.32 7505.95 105.86 S 7169.54 W 7170.3 269.2 0.32 11025.00 53.48 267.29 7520.78 106.81 S 7189.64 W 7190.4 269.1 0.93 11050.00 53.44 267.30 7535.67 107.75 S 7209.70 W 7210.5 269.1 0.16 11075.00 53.30 267.24 7550.58 108.71 S 7229.74 W 7230.6 269.1 0.59 11100.00 53.36 267.14 7565.51 109.69 S 7249.77 W 7250.6 269.1 0.40 11125.00 53.25 267.31 7580.45 110.66 S 7269.79 W 7270.6 269.1 0.70 11150.00 52.92 267.43 7595.47 111.58 S 7289.76 W 7290.6 269.1 1.37 11175.00 53.01 267.31 7610.53 112.50 S 7309.70 W 7310.6 269.1 0.53 11200.00 52.81 267.23 7625.60 113.45 S 7329.62 W 7330.5 269.1 0.84 11225.00 52.83 267.21 7640.71 114.41 S 7349.51 W 7350.4 269.1 0.10 11250.00 52.74 267.26 7655.83 115.37 S 7369.40 W 7370.3 269.1 0.39 11275.00 52.61 267.30 7670.99 116.32 S 7389.26 W 7390.2 269.1 0.54 11300.00 52.57 267.34 7686.18 117.24 S 7409.09 W 7410.0 269.1 0.20 11325.00 52.57 267.36 7701.37 118.16 S 7428.92 W 7429.9 269.1 0.06 11350.00 52.56 267.43 7716.57 119.06 S 7448.75 W 7449.7 269.1 0.23 11375.00 52.42 267.47 7731.79 119.95 S 7468.56 W 7469.5 269.1 0.57 11400.00 52.40 267.50 7747.04 120.82 S 7488.36 W 7489.3 269.1 0.12 11425.00 52.47 267.55 7762.28 121.67 S 7508.15 W 7509.1 269.1 0.32 11450.00 52.42 267.63 7777.52 122.50 S 7527.96 W 7529.0 269.1 0.32 11475.00 52.36 267.63 7792.78 123.32 S 7547.74 W 7548.8 269.1 0.24 11500.00 52.06 267.78 7808.10 124.11 S 7567.48 W 7568.5 269.1 1.29 11525.00 51.99 267.82 7823.48 124.87 S 7587.18 W 7588.2 269.1 0.31 11550.00 51.97 267.95 7838.88 125.60 S 7606.86 W 7607.9 269.1 0.42 11575.00 51.63 268.17 7854.34 126.26 S 7626.49 W 7627.5 269.1 1.53 11600.00 51.59 268.37 7869.86 126.85 S 7646.08 W 7647.1 269.0 0.65 11625.00 51.21 268.53 7885.46 127.38 S 7665.61 W 7666.7 269.0 1.60 11650.00 51.03 268.55 7901.15 127.88 S 7685.06 W 7686.1 269.0 0.72 11675.00 50.69 268.72 7916.93 128.34 S 7704.45 W 7705.5 269.0 1.46 11700.00 50.49 268.81 7932.81 128.76 S 7723.76 W 7724.8 269.0 0.85 11725.00 50.58 268.93 7948.70 129.14 S 7743.06 W 7744.1 269.0 0.52 • 13 OF 14 AK1016GCM142 • 0 gyrodata 11750.00 50.50 269.07 7964.58 129.47 S 7762.36 W 7763.4 269.0 0.54 11775.00 50.35 269.15 7980.51 129.77 S 7781.62 W 7782.7 269.0 0.65 • 11800.00 50.50 269.23 7996.44 130.05 S 7800.89 W 7802.0 269.0 0.65 11825.00 50.30 269.40 8012.37 130.28 S 7820.15 W 7821.2 269.0 0.96 11850.00 50.23 269,57 8028.36 130.45 S 7839.38 W 7840.5 269.0 0,59 11875.00 50.07 269.74 8044.37 130.57 S 7858.57 W 7859.7 269.0 0.83 11900.00 50.11 269.85 8060.41 130.63 S 7877.75 W 7878.8 269.0 0.37 A Gyrodata Directional Survey BP Exploration (Alaska) Inc. Lease: Drill Site 03 Well: 03-24A Location: Wellhead, Prudhoe Bay Unit Job Number: AK1016GCM142 MEASURED INCL AZIMUTH VERTICAL HORIZONTAL CLOSURE DOGLEG DEPTH DEPTH COORDINATES DIST. AZIMUTH SEVERITY feet deg. deg. feet feet feet deg. deg./ 100 ft. 11925.00 50.06 269.89 8076.46 130.68 S 7896.92 W 7898.0 269.1 0.23 11950.00 49.65 269.89 8092.57 130.71 S 7916.03 W 7917.1 269.1 1.64 11975.00 49.63 269.98 8108.76 130.74 S 7935.08 W 7936.2 269.1 0.29 12000.00 49.77 269.95 8124.93 130.75 S 7954.15 W 7955.2 269.1 0.57 12025.00 49.77 270.00 8141.08 130.76 S 7973.23 W 7974.3 269.1 0.15 12050.00 49.75 270.02 8157.23 130.75 S 7992.32 W 7993.4 269.1 0.10 12075.00 49.44 269.99 8173.43 130.75 S 8011.35 W 8012.4 269.1 1.24 12100.00 49.45 270.11 8189.69 130.73 S 8030.35 W 8031.4 269.1 0.37 12125.00 49.18 270.13 8205.99 130.69 S 8049.31 W 8050.4 269.1 1.08 12150.00 49.26 270.40 8222.31 130.61 S 8068.24 W 8069.3 269.1 0.88 12175.00 48.38 270.57 8238.78 130.45 S 8087.05 W 8088.1 269.1 3.56 12200.00 48.34 270.60 8255.39 130.26 S 8105.73 W 8106.8 269.1 0.18 12225.00 48.20 270.66 8272.03 130.05 5 8124.39 W 8125.4 269.1 0.59 12250.00 48.35 270.79 8288.67 129.82 S 8143.05 W 8144.1 269.1 0.71 12275.00 47.37 271.08 8305.44 129.51 S 8161.58 W 8162.6 269.1 4.01 12300.00 47.90 271.57 8322.29 129.09 S 8180.05 W 8181.1 269.1 2.57 12325.00 47.79 271.65 8339.06 128.57 S 8198.58 W 8199.6 269.1 0.50 12350.00 47.61 271.96 8355.89 127.98 S 8217.06 W 8218.1 269.1 1.17 12375.00 47.60 271.98 8372.75 127.35 S 8235.51 W 8236.5 269.1 0.07 12400.00 47.04 271.86 8389.69 126.73 S 8253.88 W 8254.9 269.1 2.27 12425.00 47.15 272.08 8406.71 126.10 S 8272.18 W 8273.1 269.1 0.78 12450.00 46.74 272.33 8423.78 125.40 S 8290.43 W 8291.4 269.1 1.80 12475.00 46.85 272.34 8440.90 124.66 S 8308.64 W 8309.6 269.1 0.44 12500.00 47.04 272.42 8457.96 123.90 S 8326.89 W 8327.8 269.1 0.80 12525.00 46.75 272.35 8475.05 123.14 S 8345.13 W 8346.0 269.2 1.18 12550.00 46.82 272.66 8492.16 122.34 S 8363.33 W 8364.2 269.2 0.95 12567.00 46.71 272.68 8503.81 121.77 S 8375.70 W 8376.6 269.2 0.65 Final Station Closure: Distance: 8376.59 ft Az: 269.17 deg. 14 OF 14 AK1016GCM142 • • Pay Pz-ocj Regg, James B (DOA) From: Regg, James B (DOA) ✓, C, Sent: Thursday, September 22, 2016 4:10 PM 1jZZJ(o To: 'Daniel, Ryan' Cc: Loepp, Victoria T (DOA) Subject: RE: P2-09 Injector(PTD 19800660) MIT-T dated 5/24/2016 submitted for AA compliance Attachments: MIT GPMA P2-09 05-24-16 Revised.xls Thank you for the information. Attached is revised MIT Form for the MIT-T dated 5/24/16. We are now showing test 1 to be Inconclusive (stabilization) and test 2 to be Pass. f-tv- "u Basis),acceptance of stabilization criteria applied by BPXA for this test; low pressure during 45 minute test; need to re- run wireline TT plug for MITT(w1vtaes5e J�— Would have been interesting to see the tubing pressure at 45 minutes on test#1. Jim Regg Supervisor, Inspections AOGCC SCANNED JUIN 2 3 2o1 7, 333 W.7th Ave,Suite 100 Anchorage,AK 99501 907-793-1236 CONFIDENTIALITY NOTICE:This e-mail message,including any attachments,contains information from the Alaska Oil and Gas Conservation Commission(AOGCC),State of Alaska and is for the sole use of the intended recipient(s).It may contain confidential and/or privileged information. The unauthorized review,use or disclosure of such information may violate state or federal law.If you are an unintended recipient of this e-mail, please delete it,without first saving or forwarding it,and,so that the AOGCC is aware of the mistake in sending it to you,contact Jim Regg at 907- 793-1236 orjim.regg@alaska.gov. From: Daniel, Ryan [mailto:Ryan.Daniel@bp.com] Sent: Thursday, September 22, 2016 2:39 PM To: Regg, James B (DOA) Cc: Loepp, Victoria T(DOA) Subject: P2-09 Injector (PTD 19800660) MIT-T dated 5/24/2016 su► itted for AA compliance Good afternoon Jim, As discussed today, here is the MIT-T information from e tubing mechanical Integrity test conducted on 5/24/2016. I have highlighted the stabilization criteria used to ev. ate this MIT-T as a "Pass" on subsequent engineering review.The initial field determination was inconclusive (color:. Yellow) because the results did meet the global BP standard of <5psi/minute for the last 15 minutes, but did n. satisfy our internal Alaska "Field Guideline" build on the old EPA 2:1 rule. The P2-09 MIT-T results were then rev.-wed by Anchorage, and were determined to be a "pass" because acceptable stabilization was demonstrated an• n conformance with both AOGCC for class-2 Injector wells and BP global internal requirements. BG IA OA Comments 3814 -16 10 Start 3600# MIT-T at 12:41pm on 5/24/16 1 • • • STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMMISSION Mechanical Integrity Test Submit to: jim.regq@alaska.gov doa.aogcc.prudhoe.bay(Walaska.gov phoebe.brooks(rDalaska.gov tom.ma�underaalaska.gov OPERATOR: BP Exploration(Alaska),Inc. /C�� 9 /�/Z�'r� FIELD/UNIT/PAD: PBU/GPMA/P2 "(1/ DATE: 05/24/16 OPERATOR REP: Adreienne McVey AOGCC REP: — ReUSeei Packer Depth Pretest Initial 15 Min. 30 Min. 45 Min. 60 Min. Well P2-09 - Type Inj. W' TVD 8,845' Tubing 749 3786- 3668- 3590 Interval 0 P.T.D. 1980660 - Type test P - Test psi 221.3 Casing 0 0 0 0 P/F Notes: Pumped 2.76 bbls ambient diesel to catch pressure OA 10 10 10 9 Inconclusive-stabilization not demonstrated. Well P2-09 - Type Inj. W ' TVD 8,845' Tubing 3,568 3,814 3,742 ' 3,683 •3,629 - Interval 0 P.T.D. 1980660 . Type test P ' Test psi 2211.25 Casing 0 0 0 0 0 P/F P Notes: Pumped 0.5 bbls ambient diesel to catch pressure OA 10 10 10 9 10 Well Type Inj. TVD Tubing Interval P.T.D. Type test Test psi Casing P/F Notes: OA Well Type Inj. TVD Tubing Interval P.T.D. Type test Test psi Casing P/F Notes: OA Well Type Inj. TVD Tubing Interval P.T.D. Type test Test psi Casing P/F Notes: OA TYPE INJ Codes TYPE TEST Codes INTERVAL Codes D=Drilling Waste M=Annulus Monitoring I=Initial Test G=Gas P=Standard Pressure Test 4=Four Year Cycle I=Industrial Wastewater R=Internal Radioactive Tracer Survey V=Required by Variance N=Not Injecting A=Temperature Anomaly Survey T=Test during Workover W=Water D=Differential Temperature Test 0=Other(describe in notes) Form 10-426(Revised 06/2010) MIT GPMA P2-09 05-24-16 Revised.xls • • P6cc Regg, James B (DOA) riga)(00 From: Daniel, Ryan <Ryan.Daniel@bp.com> Sent: Thursday, September 22, 2016 2:39 PM To: Regg,James B (DOA) I T2 1 I o Cc: Loepp, Victoria T(DOA) Subject: P2-09 Injector(PTD 19800660) MIT-T dated 5/24/2016 submitted for AA compliance Attachments: P2-09 Well Bore Schematic.pdf Good afternoon Jim, As discussed today, here is the MIT-T information from the tubing mechanical Integrity test conducted on 5/24/2016. I have highlighted the stabilization criteria used to evaluate this MJT-T as a "Pass"on subsequent engineering review.The initial field determination was inconclusive (colored Yellow) because the results did meet the global BP standard of <5psi/minute for the last 15 minutes, but did not satisfy our internal Alaska "Field Guideline" build on the old EPA 2:1 rule. The P2-09 MIT-T results were then reviewed by Anchorage, and were determined to be a "pass" because acceptable stabilization was demonstrated and in conformance with both AOGCC for class-2 Injector wells and BP global internal requirements. z— TBG IA OA Comments 3814 -16 10 Start 3600#MIT-T at 12:41pm on 5/24/16 First 15 minutes 3742 -15 10 TBG lost 72psi Second 15 minutes 3683 -15 9 TBG lost 59 psi Third 15 minutes 3629 -16 10 TBG lost 54 psi The MIT-T results were sent to the AOGCC in support of the UIC AA,and were initially reviewed as a "pass" using the usual AOGCC stabilization criteria (for a class-2 Injector). On subsequent review by the AOGCC we were notified later by Phoebe that the MIT-T was now considered a "fail" . Thanks for reconsideration. Please let me know if you have any more questions or require additional information. Rgds Ryan BPXA MIT Acceptance Criteria Extract from the Recommended Practice for Mechanical Integrity testing dated June 30th 2016 5.2 Test Acceptance Criteria (for large volume MIT's) All well integrity testing of casing and tubing strings shall be carried out as follows: ✓ Full pressure test shall be carried out for a minimum undisturbed 30-minute monitoring period. ✓ All tests shall be recorded on a calibrated chart or an electronic data logger. This data will be used at the time to assess pass/fail criteria for the test. Data shall be retained and forwarded to the Senior Fullbore WSL for filing in the shared drive. ✓ The volume of fluid pumped and returned shall be recorded. 1 • ✓ An acceptable wellbore integrity test is as follows: > Any MIT that exhibits an overall pressure loss of less than 10% of the maximum test pressure over the entire 30-minute test period and one that meets the stabilization criteria will be defined as acceptable n ;pass. ➢ In BPXA, the stabilization criteria for an acceptable MIT shall be defined as: either • A test in which the total pressure loss in the second 15-minute test period is less than 20 psi and less than the pressure loss in the first 15-minute test period or • A test in which the total pressure loss in the second 15-minute test period is either less than or equal to half the pressure loss in the first 15-minute test period and • Note: The MIT may be extended for an additional 15-minute period to demonstrate stabilization if the pressure loss results are inconclusive. A failed MIT will therefore result from either a >10% overall pressure loss over the entire test period, or failure to meet both of the stabilization criteria. es is s owing pressure stabilization(i.e. the second 15-minute pressure loss is less than the first -minute pressure loss but fails to meet the aforementioned stabilization criteria) on the advice of the test can be classified as "Under Review" and the results can be sent to town for further V Note: All failed/inconclusive tests or pressure anomalies observed during the test shall be reviewed with the WSL before initiating further actions. ✓ Note: Tracking annuli or tubing pressure during a test will result in a failed test. 5.3 Test Acceptance Criteria(for small volume MITs) When performing MITs of small volumes of less than 5 bbls (i.e. control lines, cemented OAs, etc), the test shall be carried out as follows: ✓ A full pressure test shall be carried out for a minimum undisturbed 15-minute monitoring period. ✓ All tests shall be recorded on a calibrated chart or an electronic data logger. This data will be used at the time to assess pass/fail criteria for the test. Data shall be retained and forwarded to the Fullbore Senior WSL for filing in the shared drive. ✓ The volume of fluid pumped and returned does not need to be recorded / measured. ✓ An acceptable wellbore integrity test is as follows: — The pressure loss is less than five psi/min loss rate for 15 minutes (test duration). — The test demonstrates decreasing pressure fall-off(similar to when testing BOPs). — The test pressure shall remain above or equal to the target pressure during the test evaluation period. 2 q(ZZ-I/‘6 TREE= 4-1/16'CM/ • = P2 -09 WY NOTES: WELL REQUIRES A sssv-- vIta,u-EAO F,.. gCTUfiTOR= BAKER C KB.BE = 50.53' BF.ELB/= I __ I 1 KO-R. -------- -- ---404 a u---1 2012' 9-5/8"HES CE3ANTER Max Angle= 56° a, ti550' Datum MD= 11908' 2040' —F1/2"CAMCO BAL-0 MP,ID=3.812" [ tum TVD= 8800 SS 9-5/8"CSG,40#,L-80 BUTT-M,0=8.835" — ;:5' 11, GAS LFT MANDRELS ST MD ND CEV TYPE VLV LATCH PORT DATE IA CMT SQ7JTOC(05/09/16) — -5438' 'sir r• 1 4553 4091 43 KBG-2-LS DM' INT 0 05/11/98 I 1 0 2 11832 ;: 7 , 55 KBG-2-LS 'EMY INT 0 05/11/98 I 4 'STA#2=B a - TBG PUNCH(04/28/16) — 5987' -5992' •• 't s .41 •- - yavl v v IA TOC(12/17/15) — -5998' 1.1 I 1 111 I 1 1 1.56"TBG FIJNCH(11/18/15) — 11847' -118521 c .. 0.4 .• I 1 1 . I 4 Minimum ID = 3.725" @ 11943' .0.1 11 I 0 4-1/2" HES XN NIPPLE 1189w —IT'BKR S-3 FERM FKR,ID=3.875" 10.7E4 , 11932' --14-1/2"I X tap,ID=3,813" I — 11943' —4-1/2"HES XN NIP,ID.3.725" 4-1/2'TBG,12.6#,L-I30 BTC-M, H 11954' . 11955' —4-1/2'WLEG,ID=4.00" .0152 bpf,ID=3 9.58" 11958' HELM)-f-r LcGGED 06/11/98 ' 441111, 12000' S LM FISH:CSP&CMT RETA rim DEBRIS(05124116) PBRFORATION SUMMARY I REF LOG; SPERRY St..NDUAL GR ON 5/6-5/8/98 ANGLE AT TOP PERF: 52°@ 12116' IF 12079' --ir wk RXER JOKE Nate:Refer to Production DB for historical pert data SE SFF INTERVAL Opn/Sqz SHOT SQZ 3-3/8" 6 '12044-12064 S 06/18/98 06/29/98 3-3/8" 6 '12116-12166 C 07/11/98 3-3/8" 6 '12264-12284 C 07/11/98 2-7/8' 6 '12304-12324 C 03/11/12 'DEPTH SW-11PC(SEE WELL FLE/AWGRS 3/11/12) PBTD 12422' 91/ le 7"CSG,26#,L-80 BTC-M,.0383 bpf,D=6.276' 12509' ' A DATE REV BY CMTS DATE REV BY COMMENTS FOINT MCINTY RE UNIT 0513/98 N33E INITIAL COMPLETION 05/02/16 NFICl/JMD CBRCMT RET/TBG FUNCH(4/28/16) WELL P2-09 11/11/14 RA//RIC DEPTH SHIFTING PERFORATIONS 105/10/16 TFA/JMD IA CMT SQZ(05/09/16) FERMT143:9-.:1660 12/02/15 LC/JM) TBG RJNOH&FISH(11/18-19/15) 05/24/16 JLS/JMD FISH KILLED a BAT RETS(5/19/16) AR No: 50-029-22876-00 1 _ 12/02/15 JMN'J 9 FULLED FISH(11/27/15) 05/27/16 NLW/JIX FUSHED FISH .::RISPAST TT SEC 11,T12N,R14E, 12'FSL&1087'FWL 12/02/15 i./RD/J 9 SET CBP&CMT RETA a-(11/29/15) . 02/16/16 DMS/J 9 CMT IA(12/17/15) - BP Exploration(Alaska) . -, Pages NOT Scanned in this Well History File XHVZE This page identifies those items that were not scanned during the initial scanning Project. They are available in the original file and viewable by direct inspection. ! ¢~" 0 CS ~ File Number of Well History File I PAGES TO DELETE Complete RESCAN [] Color items - Pages: Grayscale, halftones, pictures, graphs, charts- Pages: Poor Quality Original- Pages: [] Other- Pages: DIGITAL DATA [] Diskettes, No. [] Other, NofType OVERSIZED [] Logs of vadous kinds [] Other COMMENTS: Scanned by~ildred Daretha Nathan Lowell _ TO RE-SCAN Notes: Re-Scanned by: Beverly Mildred Daretha Nathan Lowell Date: Is~ • bp BP Exploration (Alaska) Inc. _, Attn: Well Integrity Coordinator, PRB -20 Post Office Box 196612 Anchorage, Alaska 99519 -6612 coD December 30, 2011 (� Mr. Tom Maunder, r Alaska Oil and Gas Conservation Commission West 7 Avenue JAN 70),/ Anchorage, Alaska 99501 Mali � 0 & Gas Len. . i Subject: Corrosion Inhibitor Treatments of DS -03 Po tr"'" Dear Mr. Maunder, Enclosed please find multiple copies of a spreadsheet with a list of wells from DS -03 that were treated with corrosion inhibitor in the surface casing by conductor annulus. The corrosion inhibitor is engineered to prevent water from entering the annular space and causing external corrosion that could result in a surface casing leak to atmosphere. The attached spreadsheet represents the well name, API and PTD numbers, top of cement depth prior to filling and volumes of corrosion inhibitor used in each conductor. As per previous agreement with the AOGCC, this letter and spreadsheet serve as notification that the treatments took place and meet the requirements of form 10 -404, Report of Sundry Operations. If you require any additional information, please contact me or my alternate, Gerald Murphy, at 659 -5102. Sincerely, Mehreen Vazir BPXA, Well Integrity Coordinator 10 • BP Exploration (Alaska) Inc. Surface Casing by Conductor Annulus Cement, Corrosion inhibitor, Sealant Top -off Report of Sundry Operations (10 -404) DS-03 10/26/11 Corrosion Initial top of Vol. of cement Final top of Cement top Corrosion inhibitor/ Well Name PTD # API # cement pumped cement off date inhibitor sealant date ft bbls ft gal 03 1750750 50029200930000 Sealed conductor NA NA NA NA NA 03 -02 1760240 50029202030000 Sealed conductor NA NA NA NA NA 03 -03 1760390 50029202110000 Sealed conductor NA NA NA NA NA 03-04 1760510 50029202180000 Sealed conductor NA NA NA NA NA 03-05 1760570 50029202220000 Sealed conductor NA NA NA NA NA 03-06 1760600 50029202240000 Sealed conductor NA NA NA NA NA 03 -07A 2040430 50029202200100 Sealed conductor NA NA NA NA NA 03 -08 1760730 50029202310000 Sealed conductor NA NA NA NA NA 03 -09 1790220 50029203620000 Sealed conductor NA NA NA NA NA 03 -10 1790210 50029203610000 Sealed conductor NA NA NA NA NA 03 -11 1790470 50029203830000 Sealed conductor NA NA NA NA NA 03 -12 1790580 50029203920000 Sealed conductor NA NA NA NA NA 03 -13 1790710 50029203990000 Sealed conductor NA NA NA NA NA 03 -14B 2090020 50029204070200 Sealed conductor NA NA NA NA NA 03 -15A 1930150 50029204140100 Sealed conductor NA NA NA NA NA 03 -16A 1970330 50029204150100 Sealed conductor NA NA NA NA NA 03 -17 1791020 50029204200000 Sealed conductor NA NA NA NA NA 03 -18A 1930420 50029204210100 Sealed conductor NA NA NA NA NA 03 -19 1830920 50029209710000 0.3 NA 0.3 NA 1.7 7/31/2010 03 -20A 1930470 50029209800100 6.2 NA 6.2 NA 40.8 8/2/2010 03 -21 1831120 50029209900000 6.6 NA 6.6 NA 49.3 8/3/2010 03 -22 1831230 50029210000000 0.0 NA 0 NA 7.7 10/26/2011 03 -23 1831270 50029210040000 >25 21.0 0.8 7/15/2011 5.1 7/182011 03 -24A 1980060 50029210150100 1.3 NA 1.3 NA 8.5 9/16/2010 03-25A 1930230 50029210210100 >25 12.0 2.25 7/12/2011 13.6 7/172011 03 -26 1831510 50029210270000 0.2 NA 0.2 NA 0.85 822010 03 -27 1840620 50029211090000 23.5 5.0 0.4 7/12/2011 3.4 7/17/2011 03-28 1840720 50029211140000 55.0 17.0 0.4 7/12/2011 3.4 7/17/2011 03 -29 1840790 50029211180000 6.0 NA 6 NA 20.4 8/3/2010 03 -30 1840830 50029211220000 4.4 NA 4.4 NA 22.5 8/3/2010 03 -31 1840920 50029211290000 10.0 NA 10 NA 113.9 8/3/2010 03-32B 2090050 50029211410200 1.5 NA 1.5 NA 8.5 7/30/2010 03-33B 2050180 50029211420200 7.8 NA 7.8 NA 57.0 7/30/2010 03-34B 2000110 50029211320200 0.2 NA 0.2 NA 9.4 10/26/2011 03-35 1910800 50029221840000 5.8 NA 5.8 NA 39.1 7/28/2010 03-36A 2070200 50029223400100 1.5 NA 1.5 NA 3.4 7/28/2010 03 -37 2091390 50029234210000 2.5 NA 2.5 NA 16.2 822010 STATE OF ALASKA ALASI~IL AND GAS CONSERVATION COMM N REPOF~ OF SUNDRY WELL OPERA ONS RECEIVED MAR ~ ~ 2010 1. Operations Performed: ^ Abandon ®Repair Well ^ Plug Perforations ^ Stimulate ^ Re-En ter ^ Alter Casing ®Pull Tubing ^ Perforate New Pool ^ Waiver ^ Other ^ Change Approved Program ^ Operation Shutdown ^ Perforate ^ Time Extension ~ ~ 2. Operator Name: 4. Well Class Before Work: . Permit To Drill Number: BP Exploration (Alaska) Inc. ®Development ^ Exploratory 198-006 3. Address: ^ Service ^ Stratigraphic . API Number: P.O. Box 196612, Anchorage, Alaska 99519-6612 50-029-21015-01-00 7. Property Designation: \ 8. Well Name and Number: \ ADL 028328 PBU 03-24A 9. Field /Pool(s): Prudhoe Bay Field / Prudhoe Bay Oil Pool 10. Present well condition summary Total depth: measured 13531' feet true vertical 9076' feet Plugs (measured) None Effective depth: measured 13487' feet Junk (measured) 12420' true vertical 8052' feet Casing Length Size MD TVD Burst Collapse Structural Conductor 81' 20" 81' 81' 1490 470 Surface 2639' 13-3/8" 2639' 2547' 4930 2670 Intermediate 12785' 9-5/8" 12785' 8668' 6870 4760 Production Liner 324' 7" 12490' - 12814' 8466' - 8687' 8160 7020 Liner 1086' 3-1/2" x 3-3/16" 12445' - 13531' 8436' - 9076' Perforation Depth: Measured Depth: 13214' - 13270' True Vertical Depth: 8853' - 8890' Tubing (size, grade, measured and true vertical depth): 5-1/2", 17# & 13Cr80 4-1/2"~, 12.6# 12558' & 8513' & 12363' - 12508' 8380' - 8479' Packers and SSSV (type, measured and true vertical depth): 8.5/8" x 5-1/2" HES TNT packer; - 12137' 8228' 9-5/8" x 5-1/2" TIW'HBBP' packer 12363' 8380' 11. Stimulation or cement squeeze summary: Intervals treated (measured): pP` 1• l$ (5 Treatment description including volumes used and final pressure: 12. Representative Daily Average Production or Injection Data Oil-Bbl Gas-Mcf Water-Bbl Casing Pressure Tubing Pressure Prior to well operation: Subsequent to operation: 13. Attachments: ^ Copies of Logs and Surveys run • Well Class after work: ^ Exploratory ®Development ^ Service erations ® Dail Re ort of Well O y p p ® Well Schematic Diagram Well Status after work: ®Oil ^ Gas ^ WDSPL ^ GSTOR ^ WAG ^ GINJ ^ WINJ ^ SPLUG 16. I hereby certify that the foregoing is true and correct to the best of my knowledge. Sundry Number or N/A if C.Q. Exempt: Contact Hank Baca, 564-5444 N/A Printed Name Terrie Hubble Title Drillin Technolo ist t1 D t v Ph 3r' Prepared ey Name/Number: b a e Signature one 564-4628 Terrie Hubble 564-4628 Form 10-404 Revised 07/2009 k~~DMS ,~~ 01 _~~ ,, Submit Original Only y~G ~ ra~,~,..f -~ rC • 03-24A, Well History (Pre Rig Workover) Date Summary 1/30/2010 WELL SHUT IN ON ARRIVAL. ATTEMPTED TO DRIFT THRU TBG COLLAPSE AT 1368' SLM. W/ 3.00" BAILER. DRIFTED W/ 2-1/2" DRIVE DOWN BAILER TO IBP AT 12,353' SLM (12,374' ELM). RAN 10' x 2-1/2" DUMP BAILER W/ SLUGGITS TO TOP OF IBP AT 12.353' SLM. CURRENTLY RIH W/ 10' x 2- 1/2" DUMP BAILER &SLUGGITS. 1/31/2010 RAN 2-1/2" x 10' DUMP BAILER W/SLUGGITS TO TOP OF RPB AT 12,353' SLM (12,373' ELM). TOTAL FOR DAY DUMPED = -1251bs (2.5 BAGS) OF SLUGGITS. CONT RIH W/ DUMP BAILER. ~a 2/1/2010 COMPLETED DUMP BAILING OF SLUGGITS ON~AT 12,373' ELM. TOP OF SLUGGITS AT 12,346' SLM (TOTAL SLUGGITS DUMPED = 2001bs). RDMO,LEFT WELL SHUT IN, PAD OP NOTIFIED, 2/5/2010 T/IA/OA= SI/400/0 Temp=cold PPPOT-T (PASS) PPPOT-IC (PASS) (Pre Rig) PPPOT-T RU 2 HP BT onto THA test void 50 psi bled to 0 psi, flushed void until clean returns achieved. Pressured to 5000 psi for 30 minute test, 5000/ 15 minutes, 4950/ 30 minutes. Bled void to 0 psi, RD test equipment. Cycled and torqued "Standard" all were in good working condition PPPOT-IC RU 2 HP BT onto IC test void 50 psi bled to 0 psi, flushed void until clean returns achieved. Pressured to 3500 psi for 30 minute test, 3500/ 15 minutes, 3450/ 30 minutes. Bled void to 0 psi, RD test equipment. Cycle and torqued LDS "Standard" all were in good working condition. *` All LDS ran out 1.5" ran in and then torqued ~'* 2/6/2010 T/I/0=390/420/0+. Temp=S1 TB & IA FL (pre bleed). No AL. TB & IA FL near surface. IA has Integral installed. 2/7/2010 T/I/0=360/370/40. Temp = SI. Bleed WHPs to 0 psi (pre-rig) before BPV set. AL disconnected. TBG, IA, OA FLs near surface. Bled TP from 360 psi to 240 psi in 10 mins (FTS), IA is tracking down with TP. Bled IAP from 250 psi to 50 psi in 3 hrs (slugging gas & 5.3 bbls of fluid). SI bleed to monitor BUR for 30 mins, WHPs = 90/50/27. TP decreased 10 psi, IAP increased 10 psi, OAP unchanged, continued bleeding IAP from 60 psi to 30 psi in 2.5 hrs (bled back 1.2 bbls of fluid). Bled OAP from 27 psi to 0 psi in 35 mins (all gas). Monitor for 30 mins, TP decreased 10 psi, IAP increased 10 psi, OAP unchanged. FWRPs=70/40/0 2/8/2010 T/I/O = 60/60/0. Temp=Sl. Bleed WHPs to 0 psi (pre RWO). TP decreased 10 psi, IAP increased 30 psi overnight. Integral installed on Crossflow & IA. TBG & IA FL near surface.Bled TP to BT from 60 psi to 10 psi in 30 min, all gas. Bled IAP from 60 psi to 5 psi in 4 hr & 30 min. During IA bleed, TP increased 10 psi. Monitor for 30 min. TP increased 3 psi, IAP increased 7 psi. Job incomplete. Final WHPs= 23/12/0, 2/12/2010 T/I/0= 100/100/0 Temp= SI Circ-Out (Pre RWO) Pumped 4 bbls 60/40 MW and started pumping 70° diesel down TBG taking return up IA through hard line to FL of well 03-23. 2/13/2010 Temp= SI Circ- Out (Pre RWO) Pumped a total of 122 bbls 70° diesel down TBG taking returns up IA through hardline to FL of well 03-23, Bleed WHPs, Final WHP's 0/0/0 2/16/2010 T/I/0= 0/0/0 Set 5" FMC ISA BPV #538 C«3 102", 1-2' ext. used; Set V/R plug on front side I/A, removed valve & blinded; Pre Doyon 16. 2/18/2010 Freeze protect disconnected FL w/ 144 bbls 60/40 meth for RWO. Pressure upp on FL to 1500 psi. RDMO. Page 1 of 1 BP EXPLORATION Page 1 of 18 Operations Summary Report Legal Well Name: 03-24 Common Well Name: 03-24 Spud Date: 9/21/1983 Event Name: WORKOVER Start: 2/22/2010 End: 3/7/2010 Contractor Name: DOYON DRILLING INC. Rig Release: 3/7/2010 Rig Name: DOYON 16 Rig Number: 16 Date From - To Hours Task Code NPT Phase Description of Operations 2/22/2010 103:00 - 16:30 ~ 13.50 ~ MOB ~ N ~ WAIT ~ PRE WAIT ON WEATHER. WIND GUSTING TO 40-MPH AND 16:30 - 18:30 I 2.00 I MOB ( P 18:30 - 21:00 I 2.501 MOB I P 21:00 - 00:00 3.00 MOB P 2/23/2010 00:00 - 07:00 7.00 ~ MOB ~ P 07:00 - 09:30 2.501 KILL P 09:30 - 10:30 I 1.001 WHSUR I P 10:30 - 11:00 ~ 0.50 ~ KILL ~ P 11:00 - 13:00 2.001 KILL ~ P BLOWING SNOW. -RIG STAGED OVER 16-01. PRE MOVE #2 PUMP MODULE, #4 GENERATOR, FUEL TANK AND CREW TRAILOR OVER TO DS 13. PRE PJSM FOR L/D DERRICK. -LIFT CELLAR DOORS. -PULL MATTS OUT FROM FRONT OF RIG. -KNOCK PINS FROM A-LEGS. -LAY DOWN DERRICK. -BACK RIG OFF OF WELL 16-01i. PRE PULL BOPE STACK FROM CELLAR. -BEGIN MOVING RIG TO DS03. -RIG OFF OF LOCATION AT 2200 Hrs. PRE MOVING RIG DOWN DS16 ACCESS ROAD. -MOVE RIG ONTO DS3 PAD AT 0130 Hrs. -MOVE RIG TO BACK SIDE OF PAD BY WELL DS3-24a. -SET RIG MATTS AROUND WELL. -PJSM AND RAISE DERRICK. -RD BRIDLE LINES. -MOVE RIG OVER WELL AT 0445 Hrs. -CENTER AND LEVEL RIG. SHIM IN PLACE. -SPOT MODULES, SLOP TANK AND ARCTIC GRADE BULK FUEL TANK. -RU RIG FLOOR. -ACCEPT RIG AT 0700-HRS ON 2/23/10 DECOMP BEGIN TAKING ON 120-DEGREE 8.5-PPG SEAWATER TO PITS. -RU CIRCULATING MANIFOLD AND LINES IN THE CELLAR. -INSTALL SECONDARY IA VALVE. -RU OA BLEED LINE TO SLOP TANK. DECOMP HOLD PJSM ON PULLING ISA BPV USING DSM LUBRICATOR. DISCUSS WORKING & TOOLS AT HEIGHTS, SPILL POTENTIALS AND NECESSARY PPE. -PULL TREE CAP. -PU & MU DSM LUBRICATOR TO TREE. -TEST LUBRICATOR TO 500-PSI USING DIESEL. -LUBRICATE OUT ISA BPV. -O-PSI UNDERNEATH BPV. -LD LUBRICATOR AND BPV. DECOMP RU CIRCULATING LINES TO TOP OF TREE AND TEST TO 3500-PSI. -HOLD PJSM ON CIRCULATING OUT DIESEL FREEZE PROTECTION WITH RIG CREW, DOYON TOOLPUSHER, BP WSL, AND CH2MHILL TRUCK DRIVERS. DISCUSS SPILL POTENTIALS, POSITIONS OF PEOPLE, AND CIRCULATION PROCEDURE. DECOMP CIRCULATE OUT DIESEL FREEZE PROTECTION AT 5.5-PM WITH 250-PSI. -TOOK 10-BBLS TO GET RETURNS. SMALL AMOUNT OF GAS NOTED AT BEGINNING OF CIRCULATION. -DIESEL RETURNS INITIALLY AND THEN SEE STRAIGHT CRUDE RETURNS AT FIRST CALCULATED BOTTOMS UP Printed: 3/19/2010 1:32:01 PM BP EXPLORATION Page 2 of 18 Operations Summary Report Legal Well Name: 03-24 Common Well Name: 03-24 Spud Date: 9/21/1983 Event Name: WORKOVER Start: 2/22/2010 End: 3/7/2010 Contractor Name: DOYON DRILLING INC. Rig Release: 3/7/2010 Rig Name: DOYON 16 Rig Number: 16 Date From - To Hours Task Code NPT Phase Description of Operations 2/23/2010 111:00 - 13:00 I 2.001 KILL I P 13:00 - 16:30 3.50 KILL P 16:30 - 17:00 0.50 KILL P 17:00 - 17:30 0.50 KILL P 17:30 - 19:00 I 1.501 WHSUR I P 19:00 - 20:00 1.00 WHSUR P 20:00 - 22:00 2.00 BOPSU P 22:00 - 23:00 1.00 BOPSU P 23:00 - 00:00 1.00 BOPSU P 12/24/2010 ~ 00:00 - 04:30 04:30 - 05:00 05:00 - 10:30 4.501 BOPSUgP 0.50 BOPSUFj P 5.50 DHB P DECOMP FOR 20-BBLS. -RETURNS CONTINUE TO BE DIESEUCRUDE MIX THROUGHOUT FIRST CIRCULATION. -PUMP SECOND FULL WELLBORE CIRCULATION WITH MIXED DIESEUCRUDE/SEAWATER RETURNS. -AT CALCULATED WELLBORE VOLUME, WEIGH RETURNS AT 8.5-PPG. -SHUT DOWN AND MONITOR WELL. INITIALLY DEAD AND THEN BEGINS FLOWING SEAWATER. -DISCUSS WITH RWO ENGINEER AND DECIDE TO CLOSE IA AND MONITOR PRESSURE. IA PRESSURE = 50-PSI AT 1220-HRS. -BLOW DOWN ALL LINES USED FOR CIRCULATION. -OA WAS OPEN TO SLOP TANK THROUGHOUT CIRCULATION WITHOUT ANY RETURNS NOTED. DECOMP RD CIRCULATING HEAD. RIG UP THE LUBRICATOR AND TEST TO 500 PSI. GOOD TEST. SET THE BPV. AT 14:00 HRS IA PRESSURE = 120 PSI, BLED APPROX. 5 BBLS OF CRUDE/DIESEL TO FINAL PRESSURE OF 30 PSI. AT 16:00 BLED FROM 125 PSI TO 50 PSI. DECOMP R1G UP AND TEST THE BPV FOR 10 MINUTES CHARTED. LAYDOWN THE LUBRICATOR. DECOMP PUMP 15 BBLS THROUGH THE CHOKE AND CIRCULATING LINES TO CLEAN OUT ANY DIESEL AND CRUDE RESIDUE. BLOW DOWN. DECOMP PJSM, NIPPLE DOWN THE TREE AND ADAPTOR FLANGE. BARRIERS: BPV AND RBP DECOMP SET BLANKING PLUG 10 RIGHTHAND TURNS, CROSS-OVER 9 LEFTHAND TURNS. DECOMP NIPPLE UP THE BOPE'S, RISER, TURNBUCKLES, AND AIR BOOTS. DECOMP RIG UP AND PREPARE TO TEST THE BOPE. DECOMP BEGIN PRESSURE E T T E BOPE TO 250 PSI LOW AND 3500 PSI HIGH. TEST WITNESSED BY BP WSL CHRIS KOBUCK AND DOYON TOURPUSHER PETE MARTINUSEN. STATES RIGHT TO WITNESS WAIVED BY JOHN CRISP. DECOMP CONTINUE TESTING THE BOPE. TEST THE 2-7/8" X 5" VBR'S WITH 2-7/8" AND 4" TEST JOINTS. GOOD TESTS. TEST THE ANNULAR WITH THE 2-7/8" TEST JOINT. GOOD TEST. TESTED THE 2-7/8" TIW AND DART VALVES. GOOD TESTS. ALL TESTS PERFORMED TO 250 PSI LOW/ 3500 PSI HIGH CHARTED. TEST WITNESSED BY BP WSL CHRIS KOBUCK AND DOYON TOURPUSHER PETE MARTINUSEN. STATES RIGHT TO WITNESS WAIVED BY JOHN CRISP. DECOMP RIG DOWN BOP TESTING EQUIPMENT DECOMP FMC PULL BLANKING PLUG. -RIG UP DUTCH RISER SYSTEM. -IA PRESSURE = 300-PSI -RIG UP DSM LUBRICATOR AND REALIZE THAT LUBRICATOR TOOL STRING WITH PLUG WILL BE rnmea: an a¢uw i:~r.~i rm BP EXPLORATION Page 3 of 18 Operations Summary Report Legal Well Name: 03-24 Common Well Name: 03-24 Spud Date: 9/21/1983 Event Name: WORKOVER Start: 2/22/2010 End: 3/7/2010 Contractor Name: DOYON DRILLING INC. Rig Release: 3/7/2010 Rig Name: DOYON 16 Rig Number: 16 Date From - To Hours Task Code NPT Phase Description of Operations 2/24/2010 05:00 - 10:30 5.50 DHB P DECOMP LONGER THAN DISTANCE FROM THE RIG FLOOR TO THE BLINDS. -DSM BRINGS OUT LUBRICATOR WITH 12' STROKE WHICH WILL GIVE 2' CLEARANCE BETWEEN BPV AND BLINDS WHEN PLUG IS RETRIEVED AND BLINDS ARE SHUT. -PU NEW LUBRICATOR AND PRESSURE TEST TO 1000-PSI. GOOD TEST. -ATTEMPT TO LUBRICATE OUT BPV WITHOUT SUCCESS. I -CHANGE RETRIEVAL TOOL FOR BETTER ' CENTRALIZATION. -PULL BPV. 330-PSI ON TUBING. -CLOSE BLINDS. -LD DSM LUBRICATOR, ISA BPV AND DUTCH RISER SYSTEM. 10:30 - 12:00 1.50 KILL P " DECOMP FILL GAS BUSTER AND RU TO REVERSE CIRCULATE DOWN IA, TAKING RETURNS THROUGH CHOKE. -OPEN CHOKE WITH 330-PSI ON BOTH TUBING AND IA. Q -REVERSE A FULL WELLBORE VOLUME TO THE 0~~ yj COLLAPSE AT 40-SPM. ~ ~(( ~ ~ w~ -LARGE AMOUNT OF GAS BREAKING OUT AND SEEING ~~ ~ ~~ ~ 1 CR TH H U RET N . -MONITOR WELL THROUGH GAS BUSTER AND IT IS ~~ STATIC. Gi+'~ -OPEN BLINDS AND WELL IS STATIC FOR -20-MINUTES. -SEE SLIGHT RETURNS AND CLOSE BLINDS AGAIN. 12:00 - 13:30 1.50 KILL P DECOMP MONITOR IA PRESSURE AND DEVELOP PLAN FORWARD ` WITH DISCUSSION BETWEEN RIG LEADERSHIP AND ~~ RWO ENGINEER. 1 1 Z3 -IA PRESSURE CLIMBS TO 150-PSI. 13:30 - 15:30 2.00 CLEAN P DECOMP GATHER COLLAPSE MILL OUT BHA COMPONENTS AND MU AS MUCH OF BHA AS POSSIBLE WITHOUT RUNNING IN THE HOLE. -MU 2-7/8" PAC TIW AND DART VALVES WITH APPROPRIATE XOs ON THE RIG FLOOR. -RU POWER TONGS AND 2-7/8" HANDLING EQUIPMENT. 15:30 - 16:30 1.00 KILL P DECOMP OPEN CHOKE WITH 150-PSI ON TUBING AND IA. -REVERSE CIRCULATE A WELLBORE VOLUME TO THE COLLAPSE AT 4-BPM. -GAS BREAKING OUT AND CRUDE/SEAWATER RETURNS. -MONITOR WELL AT GAS BUSTER -STATIC. -OPEN BLINDS AND MONITOR WELL -STATIC WITH GAS BREAK OUT. 16:30 - 18:00 1.50 CLEAN P DECOMP LINE UP AND CIRCULATE THROUGH IA, TAKING RETURNS DOWN FLOWLINE AT 1-BPM WITH 40-PSI. -HOLD PJSM ON RIH WITH COLLAPSE MILLING BHA AND ON HANDLING 2-7/8" HT PAC DP. -JIM WILLINGHAM AND DAVE REEM HOLD SAFETY FOCUS MEETING WITH RIG CREW DISCUSSING RECENT INCIDENTS, PERSONAL ACCOUNTABILITY AND NEAR MISS REPORTING. 18:00 - 19:00 1.00 CLEAN P DECOMP MU COLLAPSE MILLING BHA. -BHA CONSISTS OF 3-7/8" TAPER MILL, XO, 1-JT 2-7/8 DC, rnntea: ~naizuiu i:~cui rm BP EXPLORATION Page 4 of 18 ~ Operations Summary Report Legal Well Name: 03-24 Common Well Name: 03-24 Spud Date: 9/21/1983 Event Name: WORKOVER Start: 2/22/2010 End: 3/7/2010 Contractor Name: DOYON DRILLING INC. Rig Release: 3/7/2010 Rig Name: DOYON 16 Rig Number: 16 Date From - To Hours Task Code NPT Phase Description of Operations 2/24/2010 18:00 - 19:00 1.00 CLEAN P DECOMP XO, 4-5/8" OD STRING MILL, XO, 3-JTS 2-7/8" DC, XO, BUMPER SUB, OIL JAR, AND XO TO 2-7/8" HT PAC DP TOTAL OF 140.85'. -MAINTAIN CONTINUOUS REVERSE CIRCULATION AT 1-BPM / 40-PSI WITH MINOR AMOUNT OF GAS BREAKING OUT. 19:00 - 22:00 3.00 CLEAN P DECOMP RUN IN THE HOLE ON 2-7/8" PAC PIPE FROM THE SHED TO 1373'. -MAINTAIN CONTINUOUS REVERSE CIRCULATION AT 1-BPM / 40-PSI WITH MINOR AMOUNT OF GAS BREAKING OUT. 22:00 - 00:00 2.00 CLEAN P DECOMP ESTABLISH PARAMETERS WITH AN UP WT OF 55K AND A DOWN WT OF 60K ROTATING AT 60 RPM WITH 5K FREE TO. PUMPING AT 36 SPM WITH 440 PSI. SLACK OFF TO 1378' WHERE TAG UP ON THE OBSTRUCTION. ROTATE THROUGH SEEING THE WT. DROP OFF AT 1380'. CONTINUE TO ROTATE AND WORK THE MILL THROUGH THE AREA. PICK UP AND SLACK OFF THROUGH THE AREA SHOW SIGNS OF TAKING 2-3K. ROTATE THROUGH THE AREA SOME MORE WITH THE MILL AND CLEAN UP THE OBSTRUCTION. 2/25/2010 00:00 - 01:30 1.50 CLEAN P DECOMP PICK UP ANOTHER JOINT OF 2-7/8" PIPE AND CONTINUE IN THE HOLE TO 1414' WHERE THE UPPER MILL CONTACTED THE TROUBLED AREA. CONTNUE TO MILL THROUGH THE AREA AND SMOOTH OUT THE AREA. DECISION WAS MADE TO SINGLE IN THE HOLE TO THE SSSV TO ENSURE WE CAN GET THE CUTTER ATLEAST THAT DEEP. 01:30 - 04:00 2.50 CLEAN P DECOMP CLOSE IN THE BAG AND CIRCULATE 2 SURFACE TO SURFACE AT 40 SPM WITH 440 PSI. RETURNS OF CRUDE MIXED WITH GAS AND SEAWATER. ONCE "CLEAN" SEAWATER WAS SEEN AT SURFACE, OPENED THE BAG CIRCULATED 2 MORE SURFACE TO SURFACE AT 40 SPM WITH 440 PSI. MONITOR THE WELL FOR 10 MINUTES. STATIC 04:00 - 06:00 2.00 CLEAN P DECOMP RUN IN THE HOLE TO 2099'. LINE UP AND CIRCULATE THROUGH THE 2-7/8" DRILL PIPE TAKING RETURNS OUT THE IA TO THE SLOP TANK 40 SPM AT 420 PSI. REVERSE IN THE IA TAKING RETURNS DOWN THE FLOW LINE 70 SPM WITH 310 PSI. BEGIN PULLING OUT OF THE HOLE WHILE PUMPING IN THE IA AND TAKING RETURNS DOWN THE FLOW LINE. 06:00 - 08:30 2.50 CLEAN P DECOMP PULL OUT OF THE HOLE, LAYING DOWN 2-7/8" PAC HT DP. -REVERSE CIRCULATE THROUGH IA TAKING RETURNS DOWN FLOW LINE USING CHARGE PUMP. -BREAK OUT AND LD COLLAPSE CLEANOUT BHA. -TAPERED MILL SHOWED EXTENSIVE WEAR TO UPPER PADS AND WAS GAUGED AT 1/16" UNDER GAUGE OF 3-7/8". -4-5/8" STRING MILL SHOWED LIGHT AMOUNT OF WEAR ON BOTTOM OF BLADES AND WAS IN GAUGE. 08:30 - 10:30 2.00 WHSUR P DECOMP ATTEMPT TO DRAIN STACK TO DRY ROD IN TWC AND rnrned::tnaizuiu 132:U1 YM BP EXPLORATION Page 5 of 18 Operations Summary Report Legal Well Name: 03-24 Common Well Name: 03-24 Spud Date: 9/21/1983 Event Name: WORKOVER Start: 2/22/2010 End: 3/7/2010 Contractor Name: DOYON DRILLING INC. Rig Release: 3/7/2010 Rig Name: DOYON 16 Rig Number: 16 Date From - To Hours Task Code NPT Phase Description of Operations 2/25/2010 08:30 - 10:30 2.00 WHSUR P DECOMP . EXTREME GAS BREAKOUT WAS OBSERVED -CLOSE BLIND RAMS AND LINE UP TO CIRCULATE THROUGH CHOKE. -20-PSI ON BOTH TUBING AND IA. -CIRCULATE TWO WELLBORE VOLUMES TO COLLAPSE AT 5.1-BBLS WITH 320-PSI. -MONITOR WELL -STATIC. -OPEN BLIND RAMS AND CIRCULATE THROUGH IA WITH RETURNS DOWN FLOWLINE. -DECIDE TO CIRCULATE THROUGH CHOKE WHILE RIGGING UP DUTCH RISER SYSTEM. -AOGCC REP JEFF JONES WAS NOTIFIED OF PLANNED WELL CIRCULATION UTLIZING BOPE. 10:30 - 12:00 1.50 WHSUR P DECOMP INSTALL DUTCH RISER SYSTEM AND RILDS ON MANDREL. -REVERSE CIRCULATE DOWN IA WITH RETURNS THROUGH CHOKE AT 3.4-BPM WITH 110-PSI. -PU DSM LUBRICATOR (12' STROKE) -PRESSURE TEST LUBRICATOR TO 1000-PSI. GOOD TEST. -CEASE CIRCULATION AND OPEN BLIND RAMS. -DSM LUBRICATE IN ISA BPV. 12:00 - 12:30 0.50 WHSUR P DECOMP TEST BPV BELOW TO 1000-PSI FOR 10-CHARTED MINUTES. GOOD TEST. -LD DSM LUBRICATOR AND DUTCH RISER SYSTEM. 12:30 - 14:30 2.00 BOPSU P DECOMP FMC INSTALL BLANKING PLUG FOR ISA BPV. -OPEN PIPE RAM DOORS AND CHANGE OUT 2-7/8" X 5" VBRS TO 3-1/2 X 6" VBRS. -2-BARRIERS FOR OPENING DOORS ARE 1) TESTED BPV IN TUBING HANGER AND 2) BAKER RBP AT 12,374'. -WHILE CHANGING OUT VBRS, ALSO CLEAN RIG FLOOR, BREAK DOWN 2-7/8" PAC TIW AND DART VALVES AND MU 4" HT38 TIW AND DART VALVES FOR TESTING. -IA IS SHUT IN AND PRESSURE BUILDS TO 260-PSI ON GAUGE. -BLEED IA PRESSURE TO 60-PSI, SHUT BACK IN AND CONTINUE TO MONITOR. 14:30 - 16:30 2.00 BOPSU P DECOMP RU AND TEST 3-1/2" X 6" VBRS USING 4" AND 5-1/2" TEST ~ ~ __ JTS AND 4" HT 38 TIW AND DART VALVES. -TEST TO 250-PSI LOW AND 3500-PSI HIGH. -HOLD AND CHART EACH TEST FOR 5-MINUTES. -BP WSL AND DOYON TOOLPUSHER WITNESS ALL TESTS. 16:30 - 19:30 3.00 WHSUR P DECOMP MU BLANKING PLUG RETRIEVAL TOOL AND PULL BLANKING PLUG. LD SAME. -RU DUTCH RISER AND RILDS. -MU DSM LUBRICATOR (12' STROKE) AND TEST TO 500-PSI. GOOD TEST. -BLEED IA PRESSURE FROM 300-PSI TO 80-PSI. -OPEN BLIND RAMS AND LUBRICATE OUT BPV. -CLOSE BLINDS, BLEED OFF PRESSURE INSIDE LUBRICATOR AND LD LUBRICATOR, ISA BPV. 19:30 - 00:00 4.50 WHSUR N WAIT DECOMP DUE TO THE TEMPERATURE BEING COLDER THAN -40, Printetl: 3/19/2010 1:32:01 PM BP EXPLORATION Page 6 of 18 Operations Summary Report Legal Well Name: 03-24 Common Well Name: 03-24 Spud Date: 9/21/1983 Event Name: WORKOVER Start: 2/22/2010 End: 3/7/2010 Contractor Name: DOYON DRILLING INC. Rig Release: 3/7/2010 Rig Name: DOYON 16 Rig Number: 16 Date From - To Hours Task Code NPT Phase Description of Operations 2/25/2010 19:30 - 00:00 4.50 WHSUR N WAIT DECOMP SCHLUMBERGER E-LINE CANNOT RIG UP THEIR EQUIPMENT. SENT THEM BACK TO THE SHOP IN ORDER TO KEEP THE EQUIPMENT WARM AND CONTINUE TO MONITOR THE WEATHER THROUGHOUT THE NIGHT WITH HOURLY CONVERSATIONS BETWEEN THE BP WSL AND SCHLUMBERGER LEAD ABOUT WEATHER CONDITIONS. - ESTABLISHED CIRCULATION THROUGH THE CHOKE ~ 11 SPM WITH 50 PSI AND STAGED THE PUMPS UP TO 23 SPM WITH 110 PSI TAKING THE RETURNS TO THE SLOP TANK UNTIL CLEANED UP, THEN BACK TO THE PITS. 2/26/2010 00:00 - 12:00 12.00 WHSUR N WAIT DECOMP DUE TO THE TEMPERATURE BEING COLDER THAN -40 SCHLUMBERGER E-LINE CANNOT RIG UP THEIR EQUIPMENT. SENT THEM BACK TO THE SHOP IN ORDER TO KEEP THE EQUIPMENT WARM AND CONTINUE TO MONITOR THE WEATHER THROUGHOUT THE NIGHT WITH HOURLY CONVERSATIONS BETWEEN THE BP WSL AND SCHLUMBERGER LEAD ABOUT WEATHER CONDITIONS. - ESTABLISHED CIRCULATION THROUGH THE CHOKE AT 23 SPM WITH 110 PSI TAKING THE RETURNS TO THE SLOP TANK UNTIL CLEANED UP, THEN BACK TO THE PITS -TEMPERATURE INCREASES TO -38 DEGREES. SCHULUMBERGER MOBILIZES UNIT TO COME BACK TO LOCATION. 12:00 - 12:30 0.50 CLEAN P DECOMP CLEAR RIG FLOOR OF ALL UN-NECESSARY TOOLS AND EQUIPMENT. -DUE TO EXTREMELY COLD TEMPERATURE, DE-RATE FORKLIFT LOAD CAPACITY BY 1/2 (10,000-LBS MAX LOAD). 12:30 - 13:30 1.00 CLEAN P DECOMP WAIT FOR SCHLUMBERGER E-LINE UNIT TO ARRIVE. 13:30 - 17:30 4.00 CLEAN P DECOMP HOLD PJSM WITH SCHLUMBERGER AND RIG CREW ON RIGGING UP E-LINE WITH FULL PRESSURE CONTROL. -SPOT E-LINE UNIT AND UNLOAD SCHLUMBERGER PRESSURE CONTROL EQUIPMENT USING FORKLIFT. -BRING PRESSURE CONTROL EQUIPMENT(OTS TO RIG FLOOR AND MU TO DUTCH RISER. -PU GREASE TUBE & LUBRICATOR AND MU. -MU 4.35" GAUGE RING/JUNK BASKET W/CCL AND STAB ON LUBRICATOR TO WIRELINE BOP STACK. -RU GREASE TUBE EQUIPMENT. -PRESSURE TEST TO 500 PSI LOW AND 2500 PSI HIGH. GOOD TESTS -DURING ALL RU OPERATIONS, CIRCULATION WAS THROUGH THE IA WITH RETURNS TO THE CHOKE AT 2-BPM WITH 40-PSI. THIS CIRCULATION PATH WILL BE MAINTAINED AS MUCH AS POSSIBLE WHILE E-LINE IS STABBED ON. 17:30 - 22:00 4.50 CLEAN P DECOMP RUN IN THE HOLE WITH THE 4.35" GAUGE RING TO 12360'. SAW NO OBSTRUCTIONS. BEGIN TO PULL OUT OF THE HOLE. 22:00 - 22:30 0.50 CLEAN P DECOMP STOP AT 300' TO HOLD A PJSM TO DISCUSS HOW TO rnnieo: an mev iv i.acvi rm BP EXPLORATION Page 7 of 18 ~ Operations Summary Report Legal Well Name: 03-24 Common Well Name: 03-24 Spud Date: 9/21/1983 Event Name: WORKOVER Start: 2/22/2010 End: 3/7/2010 Contractor Name: DOYON DRILLING INC. Rig Release: 3/7/2010 Rig Name: DOYON 16 Rig Number: 16 Date From - To Hours Task Code NPT Phase Description of Operations 2/26/2010 22:00 - 22:30 0.50 CLEAN P DECOMP BREAK OUT OF THE TOOL ON SURFACE WITH ALL OF THE SCHLUMBERGER AND RIG HANDS. HOOK A HYDRAULIC HOSE TO THE GREASE HEAD. 22:30 - 00:00 1.50 CLEAN P DECOMP FINISH PULLING OUT OF THE HOLE WITH THE JUNK BASKET /GAUGE RING ASSEMBLY. EMPTY THE JUNK BASKET WHICH CONTAINED A SMALL CUP OF PARAFIN, A QUARTER SIZED PIECE OF RUBBER, AND A 2" LONG PIECE OF SMALL ALUMINUM TUBING. 2/27/2010 00:00 - 05:00 5.00 CLEAN P DECOMP P 4. 5" T RAND RUN IN THE HOLE ON E-LINE TO 12302' AND CUT THE 5.5" TUBING. AFTER THE TUBING WAS CUT CRUDE/DIESEUGAS MIXTURE WHICH WAS 8.2 PPG STARTED BREAKING OUT AT THE SURFACE. ALL RETURNS WERE TAKEN TO THE SLOP TANK. E-LINE PULLED OUT OF HOLE TO CHANGE OUT THE JET CUTTER. ONCE E-LINE WAS OUT OF THE HOLE, CLOSED THE BLINDS AND CIRCULATED AT 11 BPM WITH A ICP OF 550 PSI AND A FCP OF 300 PSI. 05:00 - 07:30 2.50 CLEAN P DECOMP PICK UP 4.15" OD JET CUTTER AND RUN IN THE HOLE ON -TEMPERATURE AT -42-DEGREES. E-LINE GRANTED PERMISSION TO CONTINUE WORK AS AN ARMED JET CUTTER IS IN THE HOLE. -E-LINE POOH AND INTO LUBRICATOR. -CLOSE BLIND RAMS AND CONTINUE TO CIRCULATE THROUGH IA TO CHOKE. -BREAK OFF LUBRICATOR AND CHECK TO MAKE SURE CUTTER FIRED. 07:30 - 09:00 1.50 CLEAN P DECOMP HOLD PJSM WITH INCOMING SCHLUMBERGER CREW AND RIG CREW. -RD SCHLUMBERGER EQUIPMENT AND STAGE FOR REMOVAL FROM RIG FLOOR AS SOON AS TEMPERATURE RISES ABOVE -40-DEGREES (WHEN LOADER OPERATIONS CAN RESUME). -RD DUTCH RISER 09:00 - 09:30 0.50 PULL P DECOMP MU 5-3/4" RH ACME XO TO JT OF 4" HT38 DRILL PIPE IN PREPARATION FOR PULLING HANGER FREE. -MU 5-1/2" NSCC XO TO FLOOR VALVES. 09:30 - 11:00 1.50 CLEAN N WAIT DECOMP TEMPERATURE REMAINS BELOW -40-DEGREES, KEEPING LOADER FROM BEING OPERATED TO COMPLETE SCHLUMBERGER E-LINE RD. 11:00 - 12:00 1.00 CLEAN P DECOMP FINISH RD SCHLUMBERGER E-LINE USING RIG LOADER, TAKING ALL EQUIPMENT OFF OF THE RIG FLOOR AND OUT OF THE PIPE SHED. -TEMPERATURE _ -39-DEGREES. 12:00 - 13:30 1.50 PULL P DECOMP PU LANDING JT AND INSTALL DOVETAIL SEAL ON 5-3/4" RH ACME XO. -VAC OUT STACK AND THERE IS A 1' LONG SECTION OF ANNULAR ELEMENT ON TOP OF HANGER NECK. ABLE TO WORK ELEMENT PIECE OFF TO SIDE OF HANGER. -SCREW INTO HANGER WITH 10-LH TURNS. -MU LANDING JT TO TOP DRIVE. -CLOSE ANNULAR AND REDUCE CLOSING PRESSURE TO 150-PSI. ~nmea: ~na¢uiu rncui rnn BP EXPLORATION Page 8 of 18 Operations Summary Report Legal Well Name: 03-24 Common Well Name: 03-24 Spud Date: 9/21/1983 Event Name: WORKOVER Start: 2/22/2010 End: 3/7/2010 Contractor Name: DOYON DRILLING INC. Rig Release: 3/7/2010 Rig Name: DOYON 16 Rig Number: 16 Date From - To Hours Task Code NPT Phase Description of Operations 2/27/2010 112:00 - 13:30 I 1.501 PULL I P 13:30 - 15:00 I 1.501 PULL I P DECOMP -LINE UP CHOKE TO BE ABLE TO CIRCULATE AS NECESSARY. -FMC TECH BOLDS. DECOMP ATTEMPT TO PULLING HANGER FREE, WORKING UP TO 60K-LBS PLUS THE WEIGHT OF THE BLOCKS, WITHOUT SUCCESS. -RECHECK THAT LDS AND ALIGNMENT PIN ARE COMPLETELY BACKED OUT -THEY ARE. -PU TO 60K-LBS PLUS BLOCK WEIGHT AND CHAIN BRAKE DOWN FOR 10-MINUTES. -SLACK OFF AND THEN PU TO 55K-LBS PLUS BLOCKS _ AND HANGER COMES FREE. T 40K-LBS PLUS BLOCK 15:00 - 15:30 I 0.501 PULL I P 15:30 - 16:30 I 1.001 PULL I P 16:30 - 20:30 4.001 PULL P 20:30 - 22:00 ~ 1.50 ~ PULL ~ P 22:00 - 23:00 1.00 ~ PULL P WEIGHT. -PULL HANGER ABOVE RIG FLOOR AND TERMINATE SINGLE 1/4" SS CONTROL LINE. -SEE LARGE AMOUNT OF FINE METAL SHAVINGS ON TOP OF HANGER AND RECOVER 1' LONG SECTION OF ANNULAR ELEMENT. DECOMP CIRCULATE A FULL WELLBORE VOLUME TO JET C TAT 2122' AT 6-BPM WITH 0-PSI. -SEE VERY SMALL AMOUNT OF CRUDE IN RETURNS. -MONITOR WELL -STATIC. -RU POWER TONGS AND BRING ALL 5-1/2" HANDLING EQUIPMENT TO RIG FLOOR WHILE CIRCULATING. DECOMP BREAK OUT LANDING JT AND LD JT OF DP. -BREAK OUT TUBING HANGER AND HANDLING PUP AND LD USING 5-3/4" RH ACME XO AS LIFTING EYE. -BLOW DOWN TOP DRIVE. -FINISH RU HANDLING EQUIPMENT TO LD 5-1/2" 13CR NSCC COMPLETION. -RU CONTROL LINE SPOOLING UNIT. DECOMP PULL OUT OF THE HOLE LAYING DOWN 5-1/2" 13CR NSCC COMPLETION FROM 2122' TO SURFACE. THE PIN END OF MOST OF THE JOINTS HAD A SMALL PIECE MISSING FROM IT AND JT # 35 HAD A 3' SPLIT IN IT WITH THE CONTROL LINE PARTED BUT STUCK INTO THE SPLIT. RECOVERED THE FOLLOWING: - 53 FULL JTS. OF 5-1/2" 13CR NSCC - 1 CUT JT. 10.95' LONG WITH A CUT OD OF 6-1/8" - 2 10' PUP JTS. - 1 SSSV - 24 STAINLESS STEEL BANDS DECOMP CLEAN AND CLEAR THE FLOOR. RIG DOWN THE CONTROL LINE SPOOLER, RIG DOWN THE POWER TONGS, SET THE WEAR BUSHING AND PREPARE TO RIH TO SPEAR REMAINING 5-1/2" 13CR NSCC. DECOMP MAKE UP SPEAR ASSEMBLY BHA TO 212'. CONSISTS OF: - BULLNOSE - 5.5" SPEAR PACKOFF ASSEMBLY - BOWEN ITCO SPEAR - BOWEN ITCO SPEAR "C" DIM. SPR. Printed: 3/19/2010 1:32:07 PM BP EXPLORATION Page 9 of 18 Operations Summary Report Legal Well Name: 03-24 Common Well Name: 03-24 Spud Date: 9/21/1983 Event Name: WORKOVER Start: 2/22/2010 End: 3/7/2010 Contractor Name: DOYON DRILLING INC. Rig Release: 3/7/2010 Rig Name: DOYON 16 Rig Number: 16 Date From - To Hours Task Code NPT Phase Description of Operations 2/27/2010 22:00 - 23:00 1.001 PULL ~ P 23:00 - 00:00 1.00 PULL P '2/28/2010 00:00 - 02:00 2.00 PULL P 02:00 - 04:30 ~ 2.50 ~ PULL ~ P 04:30 - 05:30 1.00 PULL I P 05:30 - 06:30 1.00 PULL P 06:30 - 08:00 1.50 PULL P 08:00 - 08:30 0.501 PULL P 08:30 - 09:30 1.00 PULL I P 09:30 - 13:00 3.501 PULL P 12:30 - 14:30 I 2.00 PULL ~ P DECOMP - BOWEN LBS - PUMPOUT SUB 2-3/16" OD DART - X OVER - 6(EA) 6-1/4" DRILL COLLARS -XO DECOMP RUN IN THE HOLE FROM 212' TO 526' ON 4" DRILLPIPE. DECOMP CONTINUE IN THE HOLE FROM 526' TO 2071'. - UP WT. 80K /DOWN WT. 75K DECOMP CUT AND SLIP 1800' DRILLING LINE. SERVICE THE TOP DRIVE, CROWN, BLOCKS, AND DRAW WORKS. DECOMP ESTABLISH PARAMETERS OF UP WT. 75K / DOWN WT. 82K. SINGLE IN THE HOLE FROM 2071' TO 2146' ATTEMPT TO INSERT THE SPEAR INTO THE 5.5" STUB. POSITIVE VERIFICATION OF PACKOFF GETTING TO THE TOP OF THE FISH, BUT STACKING OUT ON WT. ATTEMPT TO SIT DOWN WT ON IT AND TO ROTATE ABOVE IT, BUT STILL NO LUCK. DECISION WAS MADE TO PULL OUT OF THE HOLE AND EVALUATE OUR FISHING ASSEMBLY. DECOMP POH, STANDING BACK 4" DP IN DERRICK. DECOMP STAND BACK 2-STDS OF 6-1/4" DCS. -INSPECT SPEAR. -PACKOFF IS DEFORMED, DAMAGED AND PUSHED OUT OF POSITION ON ITS SUB. APPEARS THAT PACKOFF PUSHED OUT OF POSITION WHILE WASHING DOWN INTO TUBING STUMP AND BLOCKED THE GRAPPLE FROM ENTERING THE STUB. -DISCUSS SITUATION WITH RWO SUPERINTENDENT AND DECIDE TO ~iE-RL~N BHA WITH NEW PACKOFF. DECOMP INSTALL NEW PACKOFF CUP ON BHA. -MU BHA TO 2-STDS OF 6-1/4" DCS FROM DERRICK. DECOMP RIH WITH SPEAR BHA ON 4" DP FROM DERRICK TO 2100'. -MU TO TOP DRIVE AND RIH TO ENGAGE 5-1/2" TUBING. -NO GO STOP SUB AT 2125' (BULLNOSE AT 2137') AND SET DOWN 30K-LBS. -PU WITH PU WT OF 215K-LBS. -CONTINUE TO PU TO 2100'. DECOMP PUMP 20-BBL SAFE SURF O SWEEP FOLLOWED BY 20-BBL HI VIS SWEEP. -CHASE SWEEPS AT 5.5-BPM WITH 450-PSI. -SEE HEAVY GAS RETURNS WITH LOW READINGS (3-5 PPM)OF H2S AT 120-BBIS INTO CIRCULATION. -CLOSE ANNULAR AND CIRCULATE THROUGH CHOKE TO HELP BREAK OUT GAS AND KEEP H2S AWAY FROM RIG PERSONNEL. -NOTIFY AOGCC AND RWO SUPERINTENDENT OF USAGE OF BOP EQUIPMENT DURING PLANNED CIRCULATION. -RETURNS VERY CLEAN THROUGHOUT CIRCULATION. -MONITOR WELL THROUGH GAS BUSTER -STATIC. -OPEN ANNULAR AND MONITOR WELL -SOME BUBBLING AND FLUID LEVEL RISES SLIGHTLY. DECOMP CBU AT 10.5-BPM WITH 1320-PSI. -VERY CLEAN RETURNS THROUGHOUT CIRCULATION WITH SOME FINE, GREASE COVERED METAL CUTTINGS mimeo: ~iiaizuiu i:~z:ui rm BP EXPLORATION. Page 10 of 18 ~ Operations Summary Report Legal Well Name: 03-24 Common Well Name: 03-24 Spud Date: 9/21/1983 Event Name: WORKOVER Start: 2/22/2010 End: 3/7/2010 Contractor Name: DOYON DRILLING INC. Rig Release: 3/7/2010 Rig Name: DOYON 16 Rig Number: 16 Date From - To Hours Task Code NPT Phase Description of Operations 2/28/2010 12:30 - 14:30 2.00 PULL P 14:30 - 15:30 1.00 PULL P 15:30 - 16:00 0.50 PULL P 16:00 - 16:30 0.501 PULL P 16:30 - 19:30 3.00 PULL P 19:30 - 20:00 0.50 PULL P 20:00 - 00:00 4.00 PULL P 3/1/2010 100:00 - 00:30 I 0.501 PULL I P 00:30 - 03:30 3.00 PULL P 03:30 - 04:00 0.50 PULL P 04:00 - 05:30 1.50 BOPSU P 05:30 - 10:30 5.00 ~ BOPSU ~ P 10:30 - 11:00 0.501 BOPSUF~ P 11:00 - 12:00 1.00 WHSUR P 12:00 - 13:00 1.00 WHSUR P DECOMP COMING BACK. -MONITOR WELL -STATIC. -PUMP 15-BBL DRY JOB. -STAND BACK 1-STD AND BLOW DOWN TOP DRIVE. DECOMP POH, STANDING BACK 20-STDS OF 4" DP. DECOMP STAND BACK 2-STDS OF 6-1/4" DC S IN DERRICK. -LAYDOWN THE SPEAR ASSEMBLY. DECOMP MAKE UP THE FLOOR VALVE TO THE 5.5" NSCC CROSSOVER AND CHANGE OUT THE HANDLING EQUIPMENT TO LAY DOWN THE 5.5" TUBING. DECOMP LAYDOWN 5.5" 17# NSCC TUBING FROM 10190' TO 6590'. -CONTINUE SEEING DAMAGE OR MISSING SECTIONS OF _ SOME PIN END NOSE SEALS. DECOMP INSPECT AND SERVICE EQUIPMENT DECOMP CONTINUE TO LAYDOWN 5.5" 17# NSCC TUBING FROM 6590' TO 3400'. - NO SIGN OF OUTSIDE WEAR OR CORROSION ON ANY OF THE JTS. DECOMP SERVICE THE TOP DRIVE, SKATE, DRAW WORKS, POWER TONGS, AND HANDLING EQUIPMENT BEFORE CONTINUING TO POOH. DECOMP CONTINUE PULLING OUT OF THE HOLE WITH 5.5" TUBING FROM 3400' TO THE SURFACE. RECOVERED THE FOLLOWING: - 259 JTS OF 5.5" 17# NSCC TUBING - 7 GLM'S - 2 CUT JTS. - TOP CUT JT WAS 26.63' W ITH A 6.125" OD -BOTTOM CUT JT. WAS 8.42' W ITH A 6.25" OD DECOMP CLEAN AND CLEAR THE FLOOR OF ALL EQUIPMENT NOT NEEDED FOR FUTURE OPERATIONS. DECOMP PULL THE WEAR RING AND INSTALL THE TEST PLUG. RIG UP TO TEST THE BOPE. DECOMP PERFORM WEEKLY ROPE TEST. -TEST 3-1/2" X 6" VBRS WITH 4" AND 5-1/2" TEST JTS. TEST ANNULAR USING 4" TEST JT. -TEST TO 250-PSI LOW AND 3500-PSI HIGH. -HOLD AND CHART EACH TEST FOR 5-MINUTES. -TEST WITNESSED BY BP WSL, DOYON TOOLPUSHER AND AOGCC REP, JOHN CRISP. DECOMP RD BOP TEST EQUIPMENT. -BLOW DOWN CHOKE MANIFOLD AND ALL LINES USED FOR TESTING. -PULL TEST PLUG. -BEGIN APPLYING STEAM TO WELLHEAD FOR PACKOFF CHANGEOUT. DECOMP MU PACKOFF RETRIEVAL TOOL TO JT OF DP &RIH. -"J" INTO PACKOFF AND FMC TECH BOLDS. -PULL 45K-LBS PLUS AND PACKOFF COMES FREE. -PULL PACKOFF TO RIG FLOOR AND RELEASE FROM RUNNING TOOL. DECOMP MU NEW PACKOFF TO RUNNING TOOL AND RIH. -FMC TECH RILDS AND TEST TO 5000-PSI FOR Printed: 3/19/2010 1:32:01 PM BP EXPLORATION .Page 11 of 18 Operations Summary Report Legal Well Name: 03-24 Common Well Name: 03-24 Spud Date: 9/21/1983 Event Name: WORKOVER Start: 2/22/2010 End: 3/7/2010 Contractor Name: DOYON DRILLING INC. Rig Release: 3/7/2010 Rig Name: DOYON 16 Rig Number: 16 Date From - To Hours Task Code NPT Phase Description of Operations 3/1/2010 12:00 - 13:00 1.00 WHSUR P DECOMP 30-MINUTES. GOOD TEST. 13:00 - 14:00 1.00 DHB P DECOMP BRING ALL RBP RETRIEVAL BHA COMPONENTS TO RIG FLOOR AND STEAM TO WARM UP. -RU SMALL POWER TONGS AND 2-7/8" HANDLING EQUIPMENT. -INSTALL 9" ID WEAR RING. 14:00 - 17:00 3.00 DHB P DECOMP PJSM ON MU BHA WITH RIG CREW, BAKER FISHING REP AND BP WSL. -MU RBP RETRIEVAL BHA. -BHA CONSISTS OF 8-1/8" OD CUT LIP GUIDE W/ BUSHING & EXTENSION, RBP RETRIEVAL TOOL (INSIDE GUIDE ASSY), SHEAR PIN GUIDE ASSY, 3-JTS OF 2-7/8" HT PAC DP, 3-1/8" OD BUMPER SUB & OIL JAR, AND PUMP OUT SUB. -TOTAL BHA LENGTH = 131.18' BEFORE SHEAR, 130.37' AFTER SHEAR. -PUMP DRILL PIPE VOLUME TO ENSURE RETRIEVAL TOOL AND 2-7/8" PIPE ARE CLEAR. 17:00 - 17:30 0.50 DHB P DECOMP RIH WITH RBP RETRIEVAL BHA ON 20-STDS OF 4" DP FROM DERRICK. 17:30 - 00:00 6.50 DHB P DECOMP CONTINUE TO RIH FROM 2023' TO 8371' WITH RBP RETRIEVAL BHA, PICKING UP 4" DP FROM PIPE SHED. -PUMP 1-DP VOLUME EVERY 30-STDS RIH TO ENSURE RETRIEVAL TOOL AND 2-7/8" PIPE ARE CLEAR. UP WT. 135K /DOWN WT. 115K 3/2/2010 00:00 - 00:30 0.50 DHB P DECOMP INSPECT AND SERVICE THE TOP DRIVE, DRAW WORKS, PIPE SKATE, AND HANDLING EQUIPMENT. 00:30 - 07:30 7.00 DHB P DECOMP CONTINUE TO RUN IN THE HOLE FROM 8371' TO 12291'. RETRIEVAL BHA. -ESTABLISH PARAMETERS OF UP WT. 190K /DOWN WT. 140K WITH A ROT WT. OF 160K AT 10 RPM WITH 3K FREE TQ. -TAG STUB AT 12305'. -ROTATE INTO THE STUB AND TAG THE SLUGGITS AT 12334'. -WASH AHEAD AND TAG RBP AT 12366'. SET DOWN 5K-LBS AND TURN PUMP OFF. PU 10' OFF OF TAG AND THEN RUN BACK IN HOLE TO JUST PAST TAG DEPTH TO 12368'. -SEEING OVERPULL (5-20K-LBS) WHEN PICKING UP OFF OF NO-GO AND ABLE TO SEE PUSHING ~5K-LBS WHEN RIH. -REPEAT OPERATION 3-TIMES WITH SAME RESULTS AND NO GO EACH TIME AT 12,368'. -POH TO 12,228'. -DROP DART TO OPEN PUMP OUT SUB AND PUMP DOWN AT 3-BPM WITH 550-PSI. 07:30 - 09:00 1.50 DHB P DECOMP CBU AT 10.7-BPM WITH 2400-PSI. -SEE SLUGGITS IN RETURNS. -ALSO SMALL AMOUNT OF SLIMEY, SANDY CRUDE. -MONITOR WELL -STATIC. -PUMP 15-BBL 9.8-PPG DRY JOB. Printed: 3/19/2010 1:32:01 PM BP EXPLORATION Page 12 of 18 Operations Summary Report Legal Well Name: 03-24 Common Well Name: 03-24 Spud Date: 9/21/1983 Event Name: WORKOVER Start: 2/22/2010 End: 3/7/2010 Contractor Name: DOYON DRILLING INC. Rig Release: 3/7/2010 Rig Name: DOYON 16 Rig Number: 16 Date From - To Hours Task Code NPT Phase Description of Operations 3/2/2010 07:30 - 09:00 1.50 DHB P DECOMP -STAND BACK 1-STD OF DP IN DERRICK. -BLOW DOWN TOP DRIVE. 09:00 - 13:00 4.00 DHB P DECOMP POH FROM 12,228', STANDING BACK 4" DP IN DERRICK. 13:00 - 14:00 1.00 DHB P DECOMP L/D 3-JOINTS OF 2-7/8" HT PAC DRILLPIPE AND RETRIEVAL TOOL, BUT NO RBP. THE OUTSIDE OF THE SHOE HAS EXTENSIVE MARKINGS ON IT AS DOES THE RETRIEVAL TOOL. CONSULT WITH ADW RWO ENGINEER AND DECIDE TO RIH WITH A REDRESSED RETRIEVAL TOOL WITH A SCALLOPPED SHOE ON THE BOTTOM. 14:00 - 16:30 2.50 DHB P DECOMP BAKER FISHING BUILDING UP NEW RETRIEVAL TOOL AND GUIDE SHOE. CLOSE BLINDS AND PRESSURE TEST CASING TO 1000-psi FOR 10-mins FOR A SOLID TEST INDICATING THAT THE RBP IS STRONGLY IN PLACE. 16:30 - 17:00 0.50 DHB P DECOMP --WSL HOLD PJSM WITH RIG CREW TO DISCUSS SAFETY MESSAGE FROM TUESDAY WSL MEETING IN ANCHORAGE, WHICH INCLUDED THE EXTRA VIGILANCE WE NEED TO PAY FOR DROPPPED OBJECT PREVENTION, NEAR MISS REPORTING, AND ATTENTION TO THAs AND PJSMs. 17:00 - 18:30 1.50 DHB P DECOMP REDRESS SHEAR PIN GUIDE ASSEMBLY AND M/U TO RETRIEVAL TOOL BHA: 8-1/8" GUIDE SHOE WITH BUSHING AND EXTENSION, 2.375" RETRIEVAL TOOL, SHEAR PIN GUIDE ASSEMBLY, 3-JOINTS 2-7/8" HT PAC DRILLPIPE, LUBRICATED BUMPER SUB, OIL JARS, AND PUMP-OUT SUB. 18:30 - 23:00 4.50 FISH P DECOMP RIH WITH 2ND RBP RETRIEVAL TOOL ON 4" HT38 D~ FROM DERRICK. --STAND #25 RIH AT 1925-hours. -RIH TO 12,263' -BREAK CIRCULATION EVERY 3000'. 23:00 - 00:00 1.00 FISH P DECOMP MU TOP DRIVE AND OBTAIN PARAMETERS: PU = 185K-LBS, SO 140K-LBS, ROT 160K-LBS ~ 50-RPMS WITH 7K FREE TORQUE, PUMP RATE ~ 3-BPM WITH 310-PSI. -CONTINUE IN HOLE AND TAG STUB AT 12,305' AND SHEAR PINS AT 14K-IBS. -TAG SOLID AT 12,307'. PU AND BEGIN ROTATING ATTEMPTING TO WORK THROUGH SPOT. --2315-hrs WORK PIPE VARYING PARAMETERS FROM 0-40-RPM, 5-7K TORQUE, SET TORQUE TO NO MORE THAN 9K. 1-8-BPM WITH 2O-1200-PSI PUMP RESSURE, NO MORE THAN 5K-WOB. - WORK PIPE TO GET BACK INTO STUB. 3/3/2010 00:00 - 02:00 2.00 FISH P DECOMP CONTINUE TO WORK PIPE BACK INTO STUB. --0015-hrs GOT PIPE INTO STUB AND WAS UNABLE TO RIH BELOW 12,307'. CONTINUE TO WORK PIPE VARYING PARAMETERS FROM 0-40-RPM, 5-7K TORQUE, SET TORQUE TO NO MORE THAN 9K. 1-8-BPM WITH 20-1200-PSI PUMP RESSURE, NO MORE THAN 5K-WOB. --0110-hrs GAINED NO HEADWAY. --PRESSURED UP TO TEST CASING TO VERIFY IF RBP WAS SET. PRESSURED UP TO 2000-PSI AND HELD FOR 10-MIN. GOOD TEST. --0130-hrs MADE DECISION TO POH AND PREPARE TO Printetl: 3/19/2010 1:JL:UI PM ~ ~ BP EXPLORATION. Page 13 of 18 Operations Summary .Report Legal Well Name: 03-24 Common Well Name: 03-24 Spud Date: 9/21/1983 Event Name: WORKOVER Start: 2/22/2010 End: 3/7/2010 Contractor Name: DOYON DRILLING INC. Rig Release: 3/7/2010 Rig Name: DOYON 16 Rig Number: 16 Date From - To Hours Task Code NPT Phase Description of Operations 3/3/2010 00:00 - 02:00 2.00 FISH P DECOMP 02:00 - 06:00 4.00 FISH P DECOMP 06:00 - 07:00 1.00 FISH P DECOMP 07:00 - 09:00 2.00 FISH P DECOMP 09:00 - 10:00 1.00 FISH P DECOMP 10:00 - 11:00 1.00 FISH P DECOMP 11:00 - 12:00 1.00 FISH P DECOMP 12:00 - 19:30 7.50 FISH P DECOMP RIH WITH WASHOVER SHOE TO WASH DOWN TO RBP, UNABLE TO WORK PIPE MUCH HARDER DUE TO THE 2-7/8" DP LIMITATIONS. -PUMP SLUG, BLOW DOWN TOP DRIVE. POH FROM 12,305', S/B 4" DP IN DERRICK. B/O AND UD RETRIEVAL TOOL BHA. THE SHOE WAS WELL WORN ON THE TEETH AND THE OD WAS CONCENTRICALLY INCREASED TO 4.65" FROM THE AS-RUN OD OF 4.5". THERE WAS NO INDICATION OF ANYTHING HAVING ENTERED THE SHOE. --CALL ADW RWO ENGINEERING AND DECIDE TO RIH WITH A LONGER EXTENSION FOR THE CUTLIP GUIDE TO PLACE THE RETRIEVAL TOOL 6' UP INSIDE. THIS WILL ALLOW A LONGER SWALLOW BEFORE THE RETRIEVAL TOOL ENTERS THE STUB. WAIT ON REDRESSED RETRIEVAL TOOL FROM BAKER. IT WILL HAVE A 4.250" OD "CRIPPLED SHOE" OR MODIFIED MULESHOE ON THE BOTTOM TO FACILITATE ENTRY INTO THE 5-1/2" TUBING STUB AT 12,305'. --HOLD SAFETY MEETING WITH RIG CREW TO DISCUSS THE MOST RECENT BOP BLIND RAMS INCIDENT. --DAYLIGHT CREW ALSO TO DISCUSS THIS INCIDENT IN THEIR PRE-TOUR MEETING TODAY. PJSM. M/U RBP RETRIEVAL TOOL WITH CRIPPLED SHOE BOTTOM BHA: 8-1/8" GUTLIP GUIDE, 2-ea 8-1/8" EXTENSIONS, RBP RETRIEVAL TOOL w/CRIPPLED SHOE, SHEAR-PIN GUIDE ASSEMBLY, 3-JOINTS 2-7/8" HT-PAC DP, LUBRICATED BUMPER SUB, OIL JARS, AND PUMP-OUT SUB. THE CUTLIP GUIDE WILL SWALLOW 2.72' OF TUBING STUB AND WILL ALLOW A 6.08' STANDOFF BETWEEN THE TOP OF THE TUBING STUB AND THE CRIPPLED SHOE. RIH THE CRIPPLED SHOE BHA ON DP FROM THE DERRICK. --1100-hours, ADW RWO GROUP REQUESTS BHA CHANGE TO ELIMINATE JARS AND CHANGE OUT BUMPER SUB TO 4-3/4" OD. POH AND S/B DP IN DERRICK; B/O AND UD JARS AND BUMPER SUB. M/U LARGER (4-3/4") BUMPER SUB ON XO ABOVE THE 3-JOINTS OF 2-7/8" HT PAC DP. --CONTINUE RIH BHA ON DP FROM DERRICK. STOP AND BREAK CIRCULATION EVERY 20-STANDS. --1340-hours, RIH WITH STAND #30 AND STOP TO BREAK CIRCULATION. --1445-hours, RIH WITH STAND #60 AND STOP TO BREAK CIRCULATION. --1540-hours, RIH STAND #90, STOP AND BREAK CIRCULATION. --1645-hours, P/U STAND #129 AND GET PARAMETERS: P/U WT 185K-Ibs, S/O WT 145K-Ibs; PUMP #1, 40-SPM (3.4-BPM) AT 320-psi; PUMP #2 40-SPM (4-BPM) AT 390-psi. --1700-hrs, RIH WITH THE FIRST JOINT OF STAND #129 rnmea: snareuiu iszui rrn BP EXPLORATION Page 14 of 18 Operations Summary Report Legal Well Name: 03-24 Common Well Name: 03-24 Spud Date: 9/21/1983 Event Name: WORKOVER Start: 2/22/2010 End: 3/7/2010 Contractor Name: DOYON DRILLING INC. Rig Release: 3/7/2010 Rig Name: DOYON 16 Rig Number: 16 Date From - To Hours Task Code NPT Phase 3/3/2010 12:00 - 19:30 7.50 FISH P DECOMP 19:30 - 20:00 I 0.501 FISH DECOMP Description of Operations AND TAG STUB AT 12,305' OR 16' IN ON THE SECOND JOINT. SET DOWN 3K-Ibs. P/U STRING 8' AND BRING PUMP UP TO 37-SPM AT 370-psi; START ROTATING AND BRING UP T030-RPM, 6K-ft-Ibs FREE TORQUE, WITH 162K-Ibs ROT WT. --CONTINUE RIH AND EASILY GET OVER THE STUB WITH THE 8-1/8" GUIDE SHOE, SEE THE SHEAR PINS SHEAR AT 8K-Ibs WHEN AT 12,308'. CONTINUE RIH AND TAG STUB WITH RETRIEVAL TOOL AT 12,305'. --ATTEMPTED TO WORK THE CRIPPLED MULESHOE IN BY P/U TO START ROTATING, THEN STOP ROTATING, BUT NOT LETTING OUT THE TORQUE AND SLOWLY RIH TO LET THE STRING SLOWLY ROLL. NO SUCCESS. --1720-hrs, P/U THEN SLOWLY RIH AND SEE A TAG WITH THE SHOE AT 12,304'. P/U AND START ROTATING AT 5-RPM WITH 4.5K-ft-Ibs FREE TORQUE, PUMP RATE AT 3-BPM, 370-psi. SLOWLY RIH AND STACK OUT AT 12,305'. NO SUCCESS GETTING THROUGH. --1725-hrs, P/U TO REPEAT THE PREVIOUS SLOW ROTATION ATTEMPT AND THE MULESHOE SLIDES THROUGH WITHOUT A BOBBLE. --1730-hrs, P/U SINGLE JOINT OF DP (#388) AND BRING PUMP UP TO 7.5-BPM, 1270-psi. --1745-hrs, CONTINUE RIH TO SEE PRESSURE INCREASE TO 1430-psi AND STACK 5K-Ibs AT 19' IN. P/U TO 14' IN AND SLOWLY RIH TO 21' IN AND STACK OUT TO 5K-Ibs, BUT PRESSURE HAS DROPPED OFF TO 1270-psi. P/U AND SEE SOME OVERPULL, BUT STOP IMMEDIATELY. --1800-hrs, SLOWLY P/U TO 195K-Ibs, THEN SLACK OFF TO NEUTRAL. REPEAT TWICE AND SET DOWN TO 5K-Ibs DOWN. MAKE LITTLE HEADWAY. --1810-hrs, DECREASE RATE TO 3-BPM, 300-psi; REPEAT THE PROCESS OF P/U TO NEUTRAL, BUT SLACKING OFF TO 10K-Ibs DOWN WITH NO SUCCESS. --1815-hrs, REPEAT PROCESS BUT INCREASE DOWN WT TO 20K-Ibs, BUT STRING DROPS FREE BEFORE SEEING 20K-Ibs. APPEARS THAT WE WERE HUNG UP ON JUNK. --1825-hrs, P/U ANOTHER SINGLE JOINT. BRING ON PUMPS TO 7-BPM WITH 1300-PSI. SET DOWN SLOWLY. SET 15K-LBS DOWN, STRING BREAKS FREE AT -12,365'. --1840-hrs, CONTINUE DOWN TO 12,373' AND LATCH RBP. WORK UP AND DOWN TO VERIFY LATCHED ONTO RBP._ PULLED 10K-LBS OVERPULL WHEN PULLING FREE. -LOST RETURNS. --1844-hrs, SLOW PUMPS TO 3-BPM PREPARING TO PULL RBP ABOVE STUB. --1900-hrs, STAND BACK 2 STANDS PULLING RBP ABOVE TUBING STUB. NOTICED VERY LITTLE OVERPULL WHEN PULLING RBP OUT OF TUBING STUB. PUMP 200-BBLS AT 6-BPM WITH 1100-PSI PUMP PRESSURE TO TRY TO ESTABLISH LOSS RATE AND RETURNS. DID NOT SEE RETURNS. -BLOW DOWN TOP DRIVE. Nnntea: ~na¢uiu i:~z:ui rr~n BP EXPLORATION Page 15 of 18 Operations Summary Report Legal Well Name: 03-24 Common Well Name: 03-24 Spud Date: 9/21/1983 Event Name: WORKOVER Start: 2/22/2010 End: 3/7/2010 Contractor Name: DOYON DRILLING INC. Rig Release: 3/7/2010 Rig Name: DOYON 16 Rig Number: 16 Date From - To Hours Task Code NPT Phase Description of Operations 3/3/2010 /4/2010 20:00 - 00:00 0:00 - 01:30 4.00 .50 FISH ISH P P DECOMP ECOMP POH RACKING BACK 4" DP FROM 12,257' WITH RBP LATCHED ON. -DID NOT SEE ANY EXCESS OVERPULL WHEN PULLING OUT OF HOLE. -CONTINUOUSLY FILL HOLE AT 60-BPH. NO RETURNS LD BHA, BREAK AND LD RBP WITH RETRIEVING TOOL. RBP RETRIEVING TOOL SHOWED SIGNS OF WEAR ON SHOE TEETH. THE RBP SEALS WERE COMPLETELY MISSING. THEY ARE NOMINALLY 1.5" THICK AND 4.5" OD RELAXED AND 3-1/8" ID. 01:30 - 03:00 1.50 CLEAN P DECOMP CLEAR AND CLEAN RIG FLOOR. BRING DRESS-OFF BHA COMPONENTS TO RIG FLOOR. 03:00 - 04:00 1.00 CLEAN P DECOMP PJSM. PU AND MU 5-1/2" DRESS-OFF BHA. 8-1/2" X 5-1/2" DRESS-OFF SHOE, WASHOVER PIPE WITH TRIPLE CONNECT SUB AND INTERNAL DRESS-OFF MILL, 9-5/8" CASING SCRAPER, BUMPER SUB, 6-EA 6-1/4" DCs, PUMP OUT SUB. -OVERSHOT WILL SWALLOW 15.2' 04:00 - 09:00 5.00 CLEAN P DECOMP RIH WITH DRESS-OFF ASSEMBLY ON 4" DP FROM DERRICK. -CONTINUOUSLY FILL HOLE WITH 60-BPH OF SEAWATEf NO RETURNS. --0730-hrs, MAKE 5-EA Yo-Yo SCRAPER PASSES FROM 12,046' TO 12,268' USING TWO STANDS OF DRILLPIPE TO COVER PLANNED PACKER SETTING DEPTH OF -12,190'. 09:00 - 10:00 1.00 CLEAN P DECOMP GET PARAMETERS: 5-BPM AT 140-psi; 10-RPM, 165K-Ibs ROT WT, 7.5K-ft-Ibs FREE TORQUE. --0910-hrs, REDUCE RATE TO 2-BPM, TAG THE STUB AT 12,305' AND WORK DOWN OVER WITHOUT DIFFICULTY FOR FIRST 5', THEN SEE THAT WE ARE PUSHING SOMETHING DUE TO A SLIGHT RATTLING OF THE STRING AND SPORADIC TORQUE SPIKES TO 10K-ft-Ibs. INCREASE PUMP RATE TO 3-BPM, SEE THE INNER MILL STACK OUT AT 12,305' AND MILL FROM 12,305' TO 12,306'. --0925-hrs, P/U TO MAKE A DRY PAS BACK DOWN OVER STUB. STOP PUMP AND ROTATING AND SLOWLY RIH AND LIGHTLY TAG. MAKE 1/2 TURN AND THE SHOE DROPS RIGHT OVER. P/U AND PULL ABOVE THE STUB. RIH SLOWLY AND SHOE PASSES OVER THE STUB WITHOUT A BOBBLE; CONTINUE DOWN TO SWALLOW 12', BUT STOP 3' ABOVE TOP OF STUB TO PREVENT ANY DAMAGE TO THE "SHINED OFF" STUB. --USING CONTINUOUS HOLE-FILL OF 60-BPH DURING ALL OPERATIONS, BUT SEE NO RETURNS. 10:00 - 11:00 1.00 BUNCO RUNCMP STRAP ALL COMPLETION JEWELRY IN THE PIPE SHED ON THE OFF-DRILLER SIDE, THEN REMOVE THE JEWELRY TO ALLOW ROOM FOR POH AND UD THE DRILLPIPE. --USE 60-BPH CONTINUOUS HOLE-FILL. 11:00 - 13:00 2.00 CLEAN P DECOMP POH AND UD DP FROM 12,321' TO 11,000'. 13:00 - 14:00 1.00 CLEAN P DECOMP SLIP AND CUT DRILLING LINE. 14:00 - 23:00 9.00 CLEAN P DECOMP CONTINUE TO POH AND UD DRILLPIPE THROUGH PIPE Printed: 3/19/2010 1:32:01 PM BP EXPLORATION Page 16 of 18 Operations Summary Report Legal Well Name: 03-24 Common Well Name: 03-24 Spud Date: 9/21/1983 Event Name: WORKOVER Start: 2/22/2010 End: 3/7/2010 Contractor Name: DOYON DRILLING INC. Rig Release: 3/7/2010 Rig Name: DOYON 16 Rig Number: 16 Date From - To Hours Task Code NPT Phase Description of Operations 3/4/2010 14:00 - 23:00 9.00 CLEAN P DECOMP SHED. --1800-hrs, L/D DP JOINT #180. 23:00 - 00:00 1.00 CLEAN P DECOMP POH AND LD DRILL COLLARS. -PULL BHA TO SURFACE AND SEE THE 5-1/2" TUBING CUT JOINT. -LD BHA IN ONE PIECE TO PULL REMAINING TUBING TO SURFACE. 3/5/2010 00:00 - 01:30 1.50 CLEAN P DECOMP PJSM ON PLAN FOR LD TUBING. PULL CUT JOINT TO SURFACE AND LD, 28.84'. -CHANGE OUT ELEVATORS TO 5-1/2" TUBING TO PULL REMAINING PIPE. TOTAL PIECES: 9.44' PUP JOINT, 1.32' X-NIPPLE, 9.59' PUP JOINT, 9.59' PUP JOINT, 1.5' TIW PACKER LATCH, 1.11' PACKER SEAL ASSEMBLY. -BREAK AND UD REMAINING PARTS OF BHA. --0130-hrs TALK WITH ADW ENGINEER DAVID REEM AND JERRY MIDDENDORF, PBOC WELL SUPPORT, TO DISCUSS AND GET PERMISSION TO HANG THE TUBING 100' ABOVE THE TIW HBBP PACKER. WILL SET THE UNIQUE MACHINE OVERSHOT MULESHOE AT 12,258'. 01:30 - 02:30 1.00 CLEAN P DECOMP CLEAR AND CLEAN RIG FLOOR. 02:30 - 03:00 0.50 BOPSU P DECOMP PULL WEAR RING. 03:00 - 05:00 2.00 BUNCO RUNCMP RU 5-1/2" COMPLETION RUNNING EQUIPMENT.' CHANGEOUT BAILS, ELEVATORS, RU COMPENSATOR, POWER TONGS, STABBING BOARD. LOAD TUBING JEWELRY IN THE PIPE SHED. -HALLIBURTON DRILL OUT SHEAR SCREWS ON OVERSHOT. 05:00 - 00:00 19.00 BUNCO P RUNCMP PJSM. RUN 5-1/2" 17# 13CR-80, VAM TOP HC COMPLETION. -BAKERLOK ALL CONNECTIONS BELOW PACKER -USE JET LUBE SEAL GUARD PIPE DOPE ON ALL THREADS ABOVE PACKER. -MU JOINTS TO OPTIMUM TORQUE 6,580-LB-FT. -USE DOG COLLAR FOR THE FIRST 15-JOINTS. -CONTINUE TO FILL HOLE WITH 60-BPH, 120-DEGREE SEAWATER. NO RETURNS. --0730-hrs, FULL JOINT #12 RIH. --1040-hrs, JT #80 RIH. --1055-hrs, CHANGEOUT COLLAR ON JOINT #86. --1315-hrs, JT #108 RIH. --1535-hrs, JT #150 RIH. --1700-hrs, JT #181 RIH. --2240-hrs, MU TUBING HANGER. CHANGEOUT ELEVATORS, PU AND MU LANDING JOINT. -PU WEIGHT 220K-LBS, SO WEIGHT 145K-LBS -CONTINUE TO FILL HOLE WITH 60-BPH, 120-DEGREE SEAWATER. NO RETURNS. --2330-hrs, PULL STRIPPING RUBBER. -LAND TUBING HANGER. -FMC RILDS. 3/6/2010 00:00 - 06:00 6.00 BUNCO RUNCMP RU TO CIRCULATE --0045-hrs, PJSM FOR CIRCULATING --0100-hrs, PRESSURE TEST LINES TO 4000-PSI. Printed: 3/19/2010 1:32:01 PM • • BP EXPLORATION Page 17 of 18 Operations Summary Report Legal Well Name: 03-24 Common Well Name: 03-24 Spud Date: 9/21/1983 Event Name: WORKOVER Start: 2/22/2010 End: 3/7/2010 Contractor Name: DOYON DRILLING INC. Rig Release: 3/7/2010 Rig Name: DOYON 16 Rig Number: 16 Date From - To Hours Task Code NPT Phase Description of Operations 3/6/2010 00:00 - 06:00 6.00 BUNCO RUNCMP 06:00 - 08:30 2.50 BUNCO RUNCMP 08:30 - 10:30 2.00 WHSUB P RUNCMP 10:30 - 13:00 2.50 BOPSU P RUNCMP 13:00 - 16:00 3.00 WHSUB P RUNCMP 16:00 - 16:30 0.50 WHSUB P RUNCMP --0120-hrs, REVERSE CIRCULATE 290-BBLS OF 120-DEGREE SEAWATER --0305-hrs, REVERSE CIRCULATE 540-BBLS OF 120-DEGREE SEAWATER MIXED WITH CORROSION INHIBITOR. -PUMP AT 3-BPM WITH 0-PSI PUMP PRESSURE. -RD COMPLETION RUNNING EQUIPMENT WHILE CIRCULATING. CONTINUE REVERSE CIRCULATING. . --0615-hrs, STOP PUMPING, BREAK OFF CIRCULATING LINE ON TOP OF LANDING JOINT, DROP BALL AND ROD AND CHASE BALL AND ROD DOWN TUBING WITH 1-BPM AT 0-PSI. CATCH FLUID AT 171-STROKES OR 14.5-Bbls, WHICH PLACES THE FLUID LEVEL AT 625'. --0640-hrs, PRESSURE UP TO 4000-psi (HALLIBURTON TNT PACKER REQUIRES 3950-psi FOR FULL GLOSUREI AND HOLD FOR 30-mins FOR SOLID FLAT-LINED TEST. --0715-hrs, BLEED TUBING PRESSURE TO 1500-psi. REALIGN TO PRESSURE TEST THE IA TO 3500-psi. ; --0720-hrs, START FILLING IA, CATCH FLUID AT 200-STROKES (17-Bbls) OR AT 387'. CONTINUE PRESSURING UP TO TEST THE IA AT 3500-psi. --0745-hrs, START 3500-psi FOR 30-mins, SOLID, FLAT-LINED TEST. --0820-hrs, BLEED OFF TUBING AND SEE DCR VALVE SHEAR AT -2500-psi. --0825-hrs, GET RETURNS FROM IA TO TUBING. REALIGN TO PUMP THROUGH TUBING.AND GET RETURNS. FMC P/U AND INSTALL TWC IN TUBING HANGER. --TEST FROM ABOVE TO 3500-psi, BUT GETTING BLEED-OFF. RE-TORQUE LDS AND RE-TEST, BUT NOT SOLID. TEST FROM BELOW TO 1000-psi AND GET A SOLID TEST. --DISCUSS WITH ADW RWO SUPERINTENDENT AND GET GO-AHEAD TO N/D BOP STACK. Nm RnP GTACK..CLEAN ALL PITS. --DISCONNECT EXTERNAL POWER GENERATION MODULE, MUD PUMP #2 MODULE, AND FUEL TRAILER TO PREPARE FOR RIG MOVE. PJSM. CLEAN TUBING HEAD, FILL VOID WITH HYDRAULIC OIL. REMOVE CHOKE LINE FROM BOP STACK. --1400-hrs, PJSM TO P/U AND M/U THE ADAPTOR FLANGE. N/U THE ADAPTOR FLANGE. --1500-hrs, PJSM TO M/U THE TREE TO THE ADAPTOR FLANGE. --TEST THE HANGER VOID TO 5000-psi FOR 5-mins FOR SOLID TEST. THA REVIEW FOR FILLING THE TREE WITH DIESEL AND TESTING THE TREE TO 5000-psi. ATTENDEES WERE FLOORHANDS, DERRICKMAN, DRILLER, ROUSTABOUT, WSL, AND A VISITING CHECK-6 CONSULTANT. DISCUSSED EACH MAN'S POSITION AS WELL AS REVIEWED EACH ASPECT OF THE CHECKLIST ON THE Printed: 3/19/2010 1:32:01 PM BP EXPLORATION Page 18 of 18 ~ Operations Summary Report Legal Well Name: 03-24 Common Well Name: 03-24 Spud Date: 9/21/1983 Event Name: WORKOVER Start: 2/22/2010 End: 3/7/2010 Contractor Name: DOYON DRILLING INC. Rig Release: 3/7/2010 Rig Name: DOYON 16 Rig Number: 16 Date From - To Hours Task Code NPT Phase Description of Operations 13/6/2010 16:00 - 16:30 16:30 - 17:00 17:00 - 18:30 18:30 - 00:00 3/7/2010 100:00 - 02:30 0.50 WHSUR P 0.50 WHSUR P 1.50 WHSUR P 5.50 WHSUR P RUNCMP THA WITH RESPECT TO THE JOB COMING UP. EVEN THOUGH THE CHECK-6 CONSULTANT, DAN CARLSON, WAS ASSIGNED TO BE WITH THE LIL RED TEAM, HE WAS ASKED TO PROVIDE THA INPUT AS WELL AS TO OVERVIEW CHECK-6'S AFFILIATION WITH BP. THE HANDS AGREED THAT IT WOULD BE A GOOD IDEA TO SEE MORE OF HIM. RUNCMP FILL TREE WITH DIESEL AND TEST TREE TO 5000-psi FOR 5-mins SOLID TEST. RUNCMP DRAIN TREE. P/U LUBRICATOR AND INSTALL ON TREE TO PULL THE TWC. TEST LUBRICATOR TO 500-psi. DSM PULL TWC. RUNCMP RU TO CIRCULATE DIESEL FREEZE PROTECT. --1930-hrs, PJSM WITH LITTLE RED AND RIG CREW. --1950-hrs, PRESSURE TEST LINES TO 3500-PSI. NOTICE A SMALL PIN HOLE LEAK IN CEMENT LINE HOSE, CHANGEOUT HOSE. --2030-hrs, FINISH PRESSURE TEST HOSE LINES TO 3500-PSI. --2040-hrs, PUMP 145-BBLS OF 80-DEGREE DIESEL. CIRCULATE AT 2-BPM WITH 150-PSI. -WHILE CIRCULATING, RD COMPENSATORS FROM TOP DRIVE, PREP CELLAR FOR RIG MOVE, WORK ON PRE-RIG MOVE CHECKLIST. --2230-hrs, ALLOW DIESEL TO U-TUBE. --2330-hrs, 200-PSI REMAINING ON TUBING AND IA, CONTINUE TO U-TUBE. RUNCMP CONTINUE TO U-TUBE. PRESSURE ON IA = 140-PSI, TUBING = 220-PSI --0030-hrs, PRESSURE HAS NOT CHANGED FOR 2-hrs. OPEN BLEED TILL DIESEL CAME OUT. SHUT IN. PRESSURE ON IA = 50-PSI, PRESSURE ON TUBING = 110-PSI. --0130-hrs PRESSURE STILL THE SAME. OPEN BLEED AND AS SOON AS RETURNS SEEN SHUT IN. PRESSURE ON IA = 0-PSI, PRESSURE ON TUBING = 60-PSI. CHANGED GUAGE ON TUBING AND PRESSURE READ 0-PSI. -BLEED DIESEL OUT OF TREE AND RD LINES TO SET BPV. RUNCMP DSM SET BPV IN WELL. PLACE "BPV IN HOLE" SIGN ON TREE. --0300-hrs, LITTLE RED PRESSURE TEST BPV TO 1000-PSI FROM BELOW FOR 10-MIN CHARTED. GOOD TEST. --0320-hrs, RD LITTLE RED. -BLOW DOWN AlL LINES. - SECURE TREE. `***"`*`******RELEASE RIG AT 0500-hrs ON 3/7/10 2.501 WHSUR I P 02:30 - 05:00 I 2.501 WHSUR I P Printed: 3/19/2010 1:32:01 PM TREE _ ~ , FMC GEN 3 WlbLLHEAD = FMC ACTUATOR = BAKER C KB. ELEV....- 62' BF. ELEV..- 21.72' KOP = 1400' Max Angle = 88° @ 12944' Datum MD = 13228' Datum TV D = 8800' SS ~A T 03-24A SAFETYNOTELLANGLE> 70° @ 12956' *** WELL NEEDS ROCK EEN TO FLOW DUE TO CORRODED LINER. *** FHLITIW HBBP PKRS HAVE REDUCED TEST PRES. LIMITS IN SOME CASES. CONT. ACE (x5102) PRIOR TO PRES. TEST. LDL: LOW ER PORT. OF BTM OF COL. APP. TO BE LEAKING *** CHROME TBG *** 20" CONDUCTOR, 91.5#, H-40, ID = 19.124" 13-3/8" CSG, 72#, L-80 BTRS, ID = 12.347" ~~ 2639' Minimum ID = 2.786" @ 12706' 3-1 /2" X 3-3/16" LIN E R XO 5-1/2" TBG, 17#, 13CR-80 VAM TOP HC, I 12256' .0232 bpf, ID = 4.892" 5-1/2" TBG, 17#, 13CR-80, .0232 bpf, ID = 4.892" ~--~ 12378' TOP OF 3-1/2" LNR ~~ 12445' TOP OF 7" LNR 12494' 4-1/2" TBG, 12.6#, 13CR-80 NSCC, 12508' .0152 bpf, ID = 3.958" 3-1/2" LNR, 9.3#, L-80, .0087 bpf, ID = 2.992" 12706' 9-5/8" CSG, 47#, L-80 BTRS, ID = 8.681" ~-{ 12785 PERFORATION SUMMARY REF LOG: BHCS ON 10/11/83 ANGLE AT TOP PERF: 50° @ 13214' Note: Refer to Production DB for historical perf data SIZE SPF INTERVAL Opn/Sqz DATE 1-11/16" 30 13214 - 13244 O 03/08/98 1-11/16" 10 13260 - 13270 O 03/08/98 5-1/2" HES X NIP, ID = 4.562 GAS LIFT MANDRELS ST MD TVD DEV TYPE VLV LATCH PORT DATE 3 4522 3686 56 MMG DOME RK 16 03/12/10 2 8363 5996 54 MMG SO RK 20 03/12/10 1 11110 7583 53 MMG DMY RK 0 03/05/10 12106' - 15-1/2" HES X NIP, ID = 4.562 12137' 9-5/8" X 5-1/2" TNT PKR, ID = 4.892" 12173 5-1 /2" HES X NIP, ID = 4.562 12173' S-1/2" BKR ROCK SCREEN (31'), ID = 4.892 12258' 9-5/8" X 5-1/2" UNIQUEOVERSHOT 12363' 9-5/8" X 5-1/2" TM/ HBBP PKR, ID = 4.75" 12378' 5-1/2" X 4-1/2" XO, ID = 3.958" 12420' FISH: ROCK SCRN PARTS (01/06/09) 12445' 3-1/2" BKR DEPLOY SLV, ID = 3.00" 12479' --~4-1/2" OTIS X NIP, ID = 3.813" 12495' 4-1/2" OTIS XN NIP, ID = 3.725" ~ BEHIND CT LNR 12508' 4-1 /2" TBG TAIL 12504' ELMDTT LOGGED 11/20/95 12706' 3-1/2" X 3-3/16" XO, ID =- 2.786" MILLOUT WINDOW (03-24A) 12806' - ????~ 7" LNR, 29#, L-80 BTRS, .0371 bpf, ID = 6.184" ~~ 12806' r PBTD 13497' 3-3/16" LNR, 6.2#, L-80, .0076 bpf, ID = 2.80" 13531' DATE REV BY COMMENTS DATE REV BY COMMENTS 1983 ORIGINAL COMPLETION 03/30/10 CJW PJC ROCK SCREEN (03/28/10) 05/19/94 D16 RWO 03/30/10 CJW PJC BF ELV CORRECTION 02/23/98 N4ES CTD SDTRACK (03-24A) 03/07/10 D-16 RWO 03/08/10 PJC DRLG DRAFT CORRECTIONS 03/18/10 GJF/SV GLV C/O (03/12/10) PRUDHOE BAY UNIT WELL: 03-24A PERMff No: x1980060 API No: 50-029-21015-01 SEC 10, T10N, R15E, 522' FEL & 664' FNL BP Exploration (Alaska) 10 /08 /n9 stb _ NO. 5410 Alaska Data & Consulting Services p „� • ' { Ida t '�_ / Company: State of Alaska 2525 Gambell Street, Suite 400 [Y_ Alaska Oil & Gas Cons Comm Attn Anchorage, AK 09503-2838 �y / - „�. - - - -� 333 Christine , Suite en ATTN: Beth 1 ( vT ,,... An West 7th Avee, Suite 100 Anchorage, AK 99501 Well Job k Log Description - Date BL Color CD MPC -05A 11661124 MEMORY PROD PROFILE 01/25/07 1 L4 -03 AVIM -00032 PRODUCTION PROFILE 08/09/09 1 LS -05 AP3O -00061 PRODUCTION PROFILE 08/15/09 1 03 -24A AZCM -00042 LDL 09114/09 1 07 -328 BOCV -00027 JEWELRY LOG/GR W /PRESS/TEMP /15/09 1 W -214 AYS4-00095 INJECTION PROFILE 09/12/09 1 04 -26 BSJN -00014 PRODUCTION PROFILE / 09/25/09 1 • 07 -21 AYS4 -00098 PRODUCTION PROFILE 09117/09 1 PROM 88K5 -00003 PRODUCTION PRO 09/24/09 1 P2 -53 AP3O -00060 PRODUCTION PROFILE 09/13/09 1 S-43 AWL8 -00037 PRODUCTION PROFILE .� 09/25/09 1 12 -23 AWL8 -00035 INJECTION PROFILE 09/19/09 1 05 -38 AYTO.00029 LDL 09/18/09 1 W -29 AWJI -00050 MEM INJECTION PROFILE 09/20/09 1 W -30 AYIW00034 PLUGBACK W/X -FLOW CHECK — ( 09/12/09 1 337/L -35 B3S0 -00024 PRODUCTION PROFILE V 09/16/09 1 NK -09 AP3O -00057 IUSIT 09/07/09 7 W -07A AWJI -00047 MEM CEMENT EVAL ATION 09/07/09 1 11 -10 AYTU -00054 JUSIT 08128/09 / 02 -06B ANHY -00111 JUSIT 09/21/09 1 G-1 8A AWJI -00048 IMEM CEMENT BOND LOG G 09/17109 i PLEASE ACKNOWLEDGE RECEIPT BY SIGNING AND RETURNING ONE COPY EACH TO: BP Exploration (Alaska) Inc. Alaska Data & Consulting Services Petrotechnical Data Center LR2 -1 2525 Gambell Street. SuAe 400 900 E. Benson Blvd. Anchorage. AK 99503 -2838 • CJ �/ NOT OPERABLE: 03-24 (PTD ~80060) Secured with a downhole plu~ Page 1 of 1 Maunder, Thomas E (DOA) From: NSU, ADW Well integrity Engineer [NSUADWWeIIlntegrityEngineer@BP.com] Sent: Tuesday, September 15, 2009 8:47 AM To: NSU, ADW Well Integrity Engineer; Regg, James B(DOA); Maunder, Thomas E(DOA); Schwartz, Guy L (DOA); GPB, FS2 DS Ops Lead; GPB, FS2/COTU OTL; GPB, Area Mgr East (FS1/2/COTU/Seawater); NSU, ADW Well Operations Supervisor; Engel, Harry R; GPB, Weils Opt Eng; GPB, EOC Specialists Cc: Townsend, S. Eliot Subject: NOT OPERABLE: 03-24 (PTD #1980060) Secured with a downhole plug All, Well 03-24A (PTD #1980060) passed a CMIT-TxIA after a downhole plug was set. The passing test verifies the plug is holding and the well is secure. The well has been reclassified as Not Operable until the TxIA communication is mitigated. Please call with any questions or concerns. Thank you, Torin Roschinger (alt. Anna Dube) Well Integrity Coordinator Office (907) 659-5102 CeII (406) 570-9630 ~ ~ ~ ~ ~~~ ~~ v.' „r ~: ~ ~«~:: i. ~r, Pager (907) 659-5100 Ext. 1154 From: NSU, ADW Well Integrity Engineer Sent: Saturday, August 29, 2009 1:05 PM To: 'jim.regg@alaska.gov'; 'tom.maunder@alaska.gov'; 'Schwartz, Guy L(DOA)'; GPB, F52 DS Ops Lead; GPB, FS2/COTU OTL; GPB, Area Mgr East (FSl/2/COTU/Seawater); NSU, ADW Well Operations Supervisor; Engel, Harry R; GPB, Wells Opt Eng; GPB, EOC Specialists Cc: Chivvis, Robert; Quy, Tiffany; Holt, Ryan P(ASRC); NSU, ADW Well Integrity Engineer Subject: UNDER EVALUATION: 03-24 (PTD #1980060) Sustained Casing Pressure All, Well 03-24A (PTD #1980060) has been found with sustained casing pressure on the IA. The TIO's were 1293/2050/20 on 08/25/09. The IA was bled on 08/27l09 and showed re-pressurization overnight. The well has been re-classified as Under Evaluation to allow diagnostic testing to be completed. 1. Pumping: MIT-IA to 3000 psi 2. DHD: Monitor Enclosed are copies of a current TIO Plot and welibore schematic. « File: 03-24A TIO Plots.ZlP » Please contact us with any questions. Thank you, Taylor 9/15/2009 # ~ 03-24A TIO Plot: 12 month 3 000 ~ ' 2.000 ' ~ I ~ I ~ ~ ~i ~ ~I \~ ~ ~ ^ ~ ~ ^ 1 ~J00 ~ ~ ^ ~ ^ ~ ^ ^ ~~. CB/c7]/OB 10.'~~/~t 1121/u3 1'u~~ Ot+2.'/09 02/22%~v 03,'2V09 00!`5N9 0;/26/W OGIZE/W 07 ~7/(~ GB/27 03-24A TIO Plot: 3 month I ; a.noo ........~F.....~«..-.-.-.,-«».~« . 3 P70 z oao ~~~~ ^ _~_ Tb9 ^ IA Q4 00.4 OOOA ~ On ~_. Thg ~ •-- Q4 ~ oaa > aoon M ~ On ~ ~~ .~~~~~~~~ ~m~N~a~~~r"~ i r~,i~n~o? os~i~~o5 06n3~na nr=v~~n? ri5.~;i;ps o~roal03 07ntro9 o7na%a~i o~/75nfl Ot~~ovos o~ae,~09 n~n=do~ ns~2Zro.9 u1~29i0.9 • ! ~~ ~~ ~. '~-- =J ~~ _ ~,: ; PaoAcrive DinyNOS~ic SeevicES, Inc. ~~~L ~~~ T',14.4/1 /~'~l /1/T 7"AL To: DNR ONision of Oil & Gas Corazon Manaois 550 West 7th Avenue, Suite SDO Anchorage, Alaska 99501 RE : Cased Hole/Open Hole/Mechanical Logs and /or Tubing (nspection(Caliper/ Ml"T) The technical data listed below is being submitted herewith. Please acknowledge receipt by retuming a signed copy of this transmittal letter to the following : BP Exptoration (Alaska), Inc. Petrotechnical Data Cer~ter Attn: Joe Lastufka LR2-1 900 Benson Blvd. Anchorage, Alaska 99506 and °~;.-.~~~~A::~ n~~_,',~ ~ ~ Z00~ ProQctive Diagnostic Services, lnc. Attn: Robert A. Richey 130 West International Airport Road Suite C Anchorage, AK 9951$ Fa~ (907] 245-8952 t9~~'~a~ t~~~~ 1] Leak Detection - WLD 11~vep-09 03-24A 2~ ~ Signed : Print Name: BL / EDE 50~029-21 Q 15-01 Date : ~ PROACTNE DfAGNOSTIC SERVICES, (NC., 130 W. (NTERNATIONQL AIRPORT RD SUITE C, ANCHORAGE, AK 99518 PHONE: (807~245-8951 F~c: (907)245-88952 E-MAII __~ r;-`~ ~ WEBSRE _____~._.._~ ~, .;:: CiDocumentc and Seri'vigs\Owner`~Desktop~Tr~tt_BP.docx UNDER EVALUATION: 03-24~TD #1980060) Sustained Casing Press~ Page 1 of 1 Regg, James B (DOA) ~ ~ ~ ~~ ~~ ~,, ~ ~~m~,N. ~.. ~~.~~~..~ w ~ .~~..~,~ ~~.m~ ~m .w~_ From: NSU, ADW Well Integrity Engineer [NSUADWWeIIlntegrityEngineer@BP.com] ~~~ ~l~~l ~C7 Sent: Saturday, August 29, 2009 1:05 PM To: Regg, James B(DOA); Maunder, Thomas E(DOA); Schwartz, Guy L(DOA); GPB, FS2 DS Ops Lead; GPB, FS2/COTU OTL; GPB, Area Mgr East (FS1/2/COTU/Seawater); NSU, ADW Well Operations Supervisor; Engel, Harry R; GPB, We(Is Opt Eng; GPB, EOC Specia(isfs Cc: Chivvis, Robert; Quy, Tiffany; Holt, Ryan P(ASRC); NSU, ADW Well Integrity Engineer Subject: UNDER EVALUATION: 03-24 (PTD #1980060) Sustained Casing Pressure Attachments: 03-24A TIO Plots.ZlP - All, Well 03-24A (PTD #1980060) has been found with sustained casing pressure on the IA. The TIO's were 1293/2050/20 on 08/25/09. 7he IA was bled on 08/27/0 and s o -pressuriza ion overnight. The well has been re-ciassified as Under Evaluation to allow diagnostic testing to be completed. 1. Pumping: MIT-IA to 3000 psi 2. DHD: Monitor Enclosed are copies of a current TIO Plot and wellbore schematic. «03-24A TIO Plots.ZlP» Please contact us with any questions. Thank you, Taylor ~ :,w '` ~ ~~ : ~ . , _ . _ 9/I 1/2009 i ~ PBU 03-24A PTD 198-006 8/29/2009 3,W0 z.~o 1 * TIO Pressures: 12 month ~ = ~ ~ r i,ooo ~r~ •~ f . _ ~ y i~~.,z~i ~r in..~zvoe ivzuoe ~vzzros ovzzioe az,~~ro~ o~nioe TIO Pressures: 3 month ,~~ ~.__._.~.__..~.._ .~.._... 3,000 2 (m~n ^ ~~ 1.000 1 ~~~ • ~ 05/26/09 ~/26/D9 O7I27/p9 ~ I ^ ~ T6p ~ U~ ~~ ooa ~- ooon -f- o~ ~-- Tb9 • IA OA OOA ~ On 05/30/09 OE/C~6/09 06/13,'U9 U6R0/09 06/27/09 07/04/09 W/11/09 07/~9N9 Oi/25/09 OBN1/09 08/OB/09 OB/i5/09 OBR2/09 0629/09 MEMORANDUM TO: THRU: Julie Heusser, Commissioner Tom Maunder, P. I. Supervisor State of Alaska Alaska Oil and Gas Conservation Commission DATE: January 15, 2001 FROM: SUBJECT: John Crisp, Petroleum Inspector Safety Valve Tests Prudhoe Bay Field Drill Site 03 January 15, 2001: I traveled to BP's Prudhoe Bay Field to witness Safety Valve System tests on DS 03. Mark Womble was BP representative in charge of testing DS 03. Testing had been canceled on DS 03 1-14-01 due to blowing snow & chill factor of-50 degrees. Testing was conducted in a safe & efficient manner. Two failures were witnessed. The AOGCC test report is attached for reference. 21 wellhouses were inspected during SVS tests. Wellhouses are in fair condition considering these were inspected after our recent blow. No heat or lights are installed in wellhouses for producing wells. SUMMARY: I witnessed SVS tests in PBU on DS 03. 21 wells, 42 components tested. 2 failures witnessed. 4.8% failure rate. 21 wellhouses inspected. Attachments: SVS PBU DS 03 1-15-00jc .cc; NON-CONFIDENTIAL SVS PBU DS 03 1-15-01jc.doc Alaska Oil and Gas Conservation Commission Safety Valve System Test Report Operator: BPX Operator Rep: Mark Womble AOGCC Rep: John Crisp Submitted By: John Crisp Date: Field/Unit~ad: Prudhoe Bay Field DS 03 Separator psi: LPS 185 HPS 1/15/01 69O Well Permit Separ Set L/P Test Test Test Date Oil, WAG, GINJ, Number Number PSI PSI Trip Code Code Code Passed GAS or CYCLE 03-01 1750750 185~ 150 100 P P OIL ~03-02 1760240 1851 150 120 P P OIL 03-03 1760390 185: 150 110 P P OIL 63-04 1760510 03-05 1760570 ,, 03-06 1760600 63-07 1760530 03-08 1760730 185 150 1301 e e OIL ~3-09 1790220 185' 150 100 e e OIL 03-10 1790210 03-11 1790470 03-12 1790580 03-13 1790710 . 03-14 1790820 185 150 100 P P OIL ~3-15A 1930150 185' 150 100 P P OIL 03-16A '1970330 !03-17 1791020 03-18A 1930420 03-19 1830920 185 150 90 P P OIL 03-20A 1930470 185 150i 100 P P OIL 03-21 1831120 185 150 100 P P OIL 103-22 1831230 690 600 420 P P OIL 03-23 1831270 185 150 0 1 P OIL 03-24A 1980060 690 600 530 P P OIL 03-25A 1930230 ~3-26 1831510 185 150 I10 P P OIL 03-27 1840620 185 150 100 P P OIL 03-28 1840720 ~3-29 1840790 185 150 110 P P OIL 03-30 1840830' 185 150 90 P P OIL 03-31 1840920 185 150 140 P P OIL 03-32A 1940540: 185 150 110 P P OIL 03-33A 1970390 03-34B 2000110! 185 150 0 1 P OIL 1/18/01 Page 1 of 2 SVS PBU DS 03 1-15-01c.xls [1[[1~[ illll [ Well Permit Separ Set L/P Test Test Test Date Oil, WAG, GINJ, Number Number PSI PSI Trip Code Code Code' Passed (;AS or CYCLE 03-35 1910800 185 150 90 P P OIL 03-36 1930190 · Wells: 21 Components: 42 Failures: 2 Failure Rate: 4.8% E390 var Remarks: 1/1 ~/fll Pa~e 2 of 2 SVS PBU DS 03 1-15-01 c.xls Well C mPliance Report File on Left side of folder 198-006-0 MD 13531 TVD 09075 .. pRUDHOEBAY~T 03224X ' '50~"02922i0i520i ~0' -~C~mpletion Date: 3/8/98 Completed Status: 1-OIL Current: T Name D 8425 Interval Sent Received T/C/D SPERRY GR OH 5/13/98 5/13/98 8496 GR/CCL tF~AL NGP-MD ~AL L NGP-TVD ~INAL L TDTP tFfNAL R MWD SRVY Daily Well Ops SCHLUM TDTP CH 8/11/98 8/20/98 12130-12894 '~//Z,q/qg CH 5 7/1/98 7/2/98 12828-13530 OH 5/13/98 5/13/98 8634-9014 OH 5/13/98 5/13/98 12840-1340 ..~/(~/q[[ CH 5 8/14/98 8/20/98 .. ,c~'~}~/ 12700.-13526. OH 3/19/98 3/25/98 Are Dry Ditch Samples Required? yes no Was the well cored? yes no Analysis Description Received? yes no And Received? yes no Sample Set # Comments: Tuesday, April 04, 2000 Page 1 of 1 ¼ GeoQuest 3940 Arctic Blvd Anchorage, AK 99503 ATTN: Sherrle NO. 12022 Companl Alaska Oil & Gas Cons Comm Attn: Loft Taylor 3001 Porcupine Drive Anchorage, AK 99501 11/5/98 Field: Prudhoe Bay Floppy LIS Well Job # Log Description Date BL Sepia Disk Tape ~.8. ?-33~ 9856z ,cm., ~ "~ I"~ 98z0:~. 1 1 1 D.~. 6-~5 98559 "C~ '~ ~/~ 9"~0~ 1 1 1 D.8. 2-18~ 98550 ~S;-~ 980606 I 1 1 D.S. ~-~0~ ~ R~-~O~ ~ ~1~ ~o92~ 1 1 I *(REDO - TO CORRECT DEPTH SHIFTS) , , ) SIGNE DATE: , ,., .. , ~ '. Alaska Oil & Gas tons. ~,ummts~0 ' ~0mge Please sign and re~rn one copy of this transmlffal to Sherde at the above address or fax fo (907) 562-6521, ~ank } · GeoQuest 500 W. International Airport Road Anchorage, AK 99518-1199 ATTN: Sherrle NO. 11432 Company: Alaska Oil & Gas Cons Comm Attn: Lori Taylor 3001 Porcupine Drive Anchorage, AK 99501 8/14/98 Field: Prudhoe Bay Floppy US Well Job # Log Description Date BL RF Sepia Disk Tape D.S. 3-24A ~-~c~( ? 98359 TDTp 980306 I 1 1 D.S. 5-31 :::~.~ 98390 RST 980522 I I 1 D.S. 6-0aA ~~¶ 98392 CNTG 980512 I I 1 D.S. 6-13 ,4:1:~ 98393 TDTP-BORAx 980519 I I 1 D.S. 6-20~~'. 98394 TDTP-BORAx 980508 I I 1 D.S. 6-21 ,j~c~j 98395 . RST-BORAX 980525 I I 1 iD.S. 1-32 -/t-~'¢~,' 9a3e5 TDTP 980506 * 1 =*REPLACEMENT TAPE-THE PREVIOUSLY DISTRIBUTED TAPE DID NOT CONTAIN ANY DATA FOR FILE #15~ THI:. RAW DATA FOR THE FLUSHED pAss. THE NEW TAPE CONTAINS ALL THE DATA FROM ALL THE PASSES. .... ,, SIGNED: ~_~ DATE: Al lC ,'~/'~ 1QQ,q RECEIVE Alaska Oil & Gas L;on~, ,-,~;~'~ssior~ Please sign and return one copy of this transmittal to Sherrle at the above address or fax to (907) 562-6521. Thank ,, GeoQuest 500 W. International Airport Road Anchorage, AK 99518-1199 ATTN: Sherrie NO. 11312 Company: Alaska Oil & Gas Cons Comm Attn: Lori Taylor 3001 Porcupine Drive Anchorage, AK 99501 7/1/98 Field: Prudhoe Bay Floppy LIS Well Job # Log Description Date BL RF Sepia Disk Tape GNI #1 TEMPERATURE LOG W/PRESSURE 980606 1 1 GNI #2 TEMPERATURE/PRESSURE LOG 980512 I 1 GNI #3 PRESSURE TEMPERATURE LOG 980606 1 1 D.S. 2-25 PRODUCTION PROFILE LOG 980511 I 1 D.S. 3-22 PRODUCTION LOG 980531 I 1 D.S. 3-24A GR/CCL LOG 980529 I 1 D.S. 3-31 STATIC PRESSURE SURVEY 98051 4 1 1 D.S. 9-44 PRODUCTION PROFILE LOG 980511 1 1 D.S. 11-2 INJECTION PROFILE LOG 98051 3 I 1 D.S. 11-05A PRODUCTION PROFILE 980527 I 1 D.S. 11-6 PRODUCTION PROFILE 980522 I 1 D.S. 11-24A PRODUCTION LOG & GAS LIFT SURVEY 980531 1 1 D.S. 12-33 i,~J ~ INJECTION PROFILE 980528 I 1 D.S. 14-36 1,4. I ~.~ INJECTION PROFILE LOG 980604 1 1 ~).S. 17-19A STATIC PRESSURE SURVEY 9 8051 4 I 1 D.S. 17-19A PRESSURE & TEMPERATURE SURVEY 9 80601 I 1 SIGNED~~ DATE: Please sign and return one copy of this transmittal to Sherrie at the above address or fax to (907) 562-6521. Thank you. r"~ I~ I L.I,_ I N I~ WELL LOG TRANSMITTAL To: State of Alaska May 13, 1998 Alaska Oil and Gas Conservation Comm. Attn.: Loft Taylor 3001 Porcupine Dr. Anchorage, Alaska 99501 MWD Formation Evaluation Logs - D. S 3-24A, .M(-MW-80123 The technical data listed below is being submitted herewith. Please acknowledge receipt by returning a signed copy of this transmittal letter to the attention of.' Ali Turker, Sperry-Sun Drilling Services, 5631 Silverado Way, #G, Anchorage, AK 99518 1 LDWG formatted Disc with verification listing. API#: 50-029-21015-01. 5631 Silverado Way, Suite G · Anchorage, Alaska 99518 · (907) 563-3256 · Fax (907) 563-7252 A Division of Dresser Industries. Inc. WELL LOG TRANSMITTAL To: State of Alaska May 13, 1998 Alaska Oil and Gas Conservation Comm. Attn.: Loft Taylor 3001 Porcupine Dr. Anchorage, Alaska 99501 RE: MWD Formation Evaluation Logs D.S. 3-24A, AK-MW-80123 The technical data listed below is being submitted herewith. Please address any problems or concerns to the attention of.' Ali Turker, Sperry-Sun Drilling Services, 5631 Silverado Way, #G, Anchorage, AK 99518 D.S. 3-24A · 2" x 5" MD Gamma Ray Logs: 50-029-21015-01 2"x 5" TVD Gamma Ray Logs: 50-029-21015-01 1 Blueline 1 Folded Sepia 1 Blueline ........... 1- Folded Sepia .~"~. ~ .... X C.-~'-b~_. :.~.~-~ ~ 5631 Silverado Way, Suite G · Anchorage, Alaska 99518 · (907) 563-3256 · Fax (907) 563-7252 A Division of Dresser Industries, Inc. STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMMISSION WELL COMPLETION OR RECOMPLETION REPORT AND LOG 1 Status of Well Classification of Service Well Oil X Gas__ Suspended Abandoned__ Service__ 2 Name of Operator 7 Permit Number ARCO Alaska, Inc. 98-06 3 Address 8 APl Number P.O. Box 100360, Anchorage, AK 99510-0360 i'-.',' .:_ '. :.-: :; ~ ~ r, 50-029-21015-01 4 Location of well at surface :' ' "''~: ' : '~ ~~t,,~. 9 Unit or Lease Name 644' FSL, 522' FEL, Sec 10, T10N, R15E, UM. i '~'~/;<' ;':':~"~ ¢t i~I~''~~ 3-24APRUDHOE BAY UNIT At Top Producing interval .......... ~ I ,,~B~, ~, 10 Well Number 654' FSL, 1424' FWL, Sec9, T10N, R15E, UM. (approx) At Total Depth ~,.~:~.~-"'~;~ ¥"¥¥.?~? ~ ..... I 11 Field and Pool 5015' FNL, 4061' FEL, Sec 9, T10N, R15E, UM. PRUDHOE BAY FIELD 5 Elevation in feet (indicate KB, DF, etc.) 6 Lease Designation and Serial No. 62' RKB ADL 28328 PRUDHOE BAY OIL POOL 12 Date Spudded 13 Date T.D. Reached 14 Date Comp., Susp., or Aband. 15 Water Depth, if offshore 16 No. of Completions 2/16/98 2/21/98 3/8/98 v/ N/A 1 17 Total Depth (MD+TVD) 18 Plug Back Depth (MD+TVD) 19 Directional Survey 20 Depth where SSSV set 21 Thickness of Permafrost 13531' MD / 9075' TVD 13497' MD / 9052' TVD YES_X NO__ 2197' feet MD 1900' (approx) 22 Type Electric or Other Logs Run MWD, GR. 23 CASING, LINER AND CEMENTING RECORD SETTING DEPTH CASING SIZE WT. PER FT. GRADE TOP DO'I-rOM HOLE SIZE CEMENTING RECORD AMT PULLED 20" 91.5# H-40 Surf 81' 30" 1937# Poleset 13-3/8" 72# L-80 Surf 2639' 17.5" 3600 Sx CS III, 550 Sx CS II 9-5/8" 47# L-80 Surf 12785' 12.25" 500 Sx Class G & 250 Sx CS I 7" 29# L-80 12490' 12814' 8.5" 327 Sx Class G 3-1/2" 8.4# L-80 12445' 12708' 3.75" 15 Bbls Class G 3-3/16" 6.2# L-80 12708' 13531' 3.75 ........ 24 Perforations open to Production (MD+TVD of Top and Bottom and 25 TUBING RECORD interval, size and number) SIZE DEPTH SET MD PACKER MD 5-1/2" Tbg 12378' 12363' 13214 - 13244' MD; 8853- 8873' TVD; @ 4 spf. 4-1/2" Tbg 12508' 13260 - 13270' MD; 8883- 8890' TVD; @ 4 spf. 26 ACID, FRACTURE, CEMENT SQUEEZE, ETC. DEPTH INTERVAL MD AMT & KIND MATERIAL USED 27 PRODUCTION TEST ?,, } ~,..) ! L- Date First Production Method of Operation (Flowing, gas lift, etc.) 3/11/98 Flowing Date of Test Hours Tested PRODUOTION FOR OIL - BBL GAS - MCF WATER - BBL CHOKE SIZE I GOR 3/16/98 3.2 TEST PERIOD __] 5351 Flow Tubing Press Casing Pressure CALCULATED OIL - BBL GAS - MCF WATER - BBL OIL GRAVITY - APl (con') 350 24 HOUR RATE _X 2003 10718 1692 28 CORE DATA Brief description of lithology, porosity, fractures, apparent dips and presence of oil,'gas, or water. Submit core chips. * This 10-407 is submitted as directed per the 10-401 form approved 1/22/98 (Permit # 98-06). Form 10-407 Rev. 7-1-80 CONTINUED ON REVERSE SIDE -.. Submit in duplicate NAME GEOLOGIC MARKERS MEAS DEPTH TRUE VERT DEPTH FORMATION TESTS Include interval tested, pressure data, and fluids recovered and gravity, GOR, and time of each phase. 31 LIST OF ATTACHMENTS Summary of 3-24A CT Sidetrack Drilling Operations. 321 hereby certify that the foregoing is true and correct to the best of my knowledge Erin Oba Engineering Supervisor INSTRUCTIONS Prepared by Paul Rauf, 263-4990 General: This form is designed for submitting a complete and correct well completion report and Icg on all types of lands and leases. Item 1: Classification of Service Wells: Gas injection, water injection, steam injection, air injection, salt water disposal, water supply for injection, observation, injection for in-situ combustion. Item 5: Indicate which elevation is used as reference (where not otherwise shown) for depth measurements given in other spaces on this form and in any attachments. Item 16 and 24: If this well is completed for separate production from more than one interval (multiple completion), so state in item 16, and in item 24 show the producing intervals for only the interval reported in item 27. Submit a separate form for each additional interval to be separately produced, showing the data pertinent to such interval. Item 21: Indicate whether from ground level (GL) or other elevation (DF, KB, etc.). Item 23: Attached supplemental records for this well should show the details of any multiple stage cementing and the location of the cementing tool. Item 27: Method of operation: Flowing, Gas Lift, Rod Pump, Hydraulic Pump, Submersible, Water Injection Gas Injection, Shut-In, Other-explain. Item 28: If no cores taken, indicate "none". Form 10-407 Rev. 7-1-80 3-24A DESCRIPTION OF WORK COMPLETED COIL TUBING SIDETRACK DRILLING OPERATIONS 2/15/98: MIRU CTU & PT equipment. RIH w/pilot hole milling BHA &tagged TOC at 12731' MD. Started milling pilot hole through cement at 12731' MD. 2/16/98: . Milled pilot hole to 12810' MD. POOH w/BHA. 2/17/98: Completed window from 12814' to 12818' MD. RIH w/3.8" milling BHA & started window through 7" liner. Drilled into formation to 12827' MD. POOH w/BHA. WOW. 2/18~98: WOW. PT BOPE. RIH w/windowdressing BHAto dress window. 2/19/98: Continued dressing window. Displaced hole w/FIo Pro. Leak off test to EMW 10 ppg. POOH w/BHA. w/3.75" Bi-centered bit & drilled Sidetrack build section to 13022' MD. RIH 2/20/98: Continued drilling to 13120' MD. tripsto window. POOH w/BHA. POOH w/BHA. RIH w/drilling BHA & drilled to 13382' MD w/periodic shod 2/21/98: RIH w/drilling BHA. Continued drilling to TD at 13531' MD. Spotted Hi Vis pill in OH. POOH w/BHA. 2/22/98: PT BOPE. MU & RIH w/3-3/16" x 3-1/2" Liner assembly. Landed liner at 13531' MD. Class G cement to set liner at 12445 - 13531' MD. Contaminated cement w/biozan. Pumped 15 bbls 2/23/98: RIH w/milling BHA & milled cement stringers from liner to wiper plug at 13397' MD. Milled through wiper plug & cement plug to 13497' MD. Circulated Hi Vis sweep in liner. POOH w/BHA while displacing well w/1% KCL. ND BOPE. NU &PTtree. RDMOL. 3/8/98: RIH w/perforating guns & shot initial perforations at: 13214 - 13244' MD 13260 - 13270' MD Used 1-11/16" carriers & shot all perfs at 4 spf. POOH w/perf guns. Placed the well on initial production & obtained a valid well test. RD. SPERRY-SUN DRILLING SERVICES ANCHORAGE ALASKA. ARCO ALASKA, iNC. PBU / 3-24A 500292101501 NORTH SLOPE BOROUGH COMPUTATION DATE: 3/19/98 DATE OF SURVEY: 022198 MWD SURVEY JOB NUMBER: AKMW80123 PAGE KELLY BUSHING ELEV. = 62.00 FT. OPERATOR: ARCO ALASKA INC TRUE SUB-SEA COURS COURSE DLS TOTAL MEASD VERTICAL VERTICAL INCLN DIRECTION RECTANGULAR COORDINATES VERT. DEPTH DEPTH DEPTH DG MN DEGREES DG/100 NORTH/SOUTH EAST/WEST SECT. 12700.00 8610.15 8548.15 46 49 N 82.22 W .00 12780.00 8664.76 8602.76 47 4 N 81.60 W .65 12813.09 8686.80 8624.80 49 23 N 81.40 W 7.00 12827.64 8695.87 8633.87 53 26 N 82.40 W 28.35 12851.34 8708.59 8646.59 61 36 N 86.82 W 37.88 12.07S 8459.98W 305.84 3.84S 8517.86W 299.62 .19S 8542.26W 296.83 1.41N 8553.52W 295.62 3.25N 8573.41W 294.47 12879.87 8720.04 8658.04 71 1 S 88.72 W 35.94 12896.14 8724.64 8662.64 76 6 S 88.37 W 31.35 12914.89 8728.13 8666.13 82 26 S 85.21 W 37.60 12944.36 8730.64 8668.64 87 48 S 74.84 W 39.48 12970.01 8731.73 8669.73 87 21 S 64.11 W 41.83 3.64N 8599.49W 294.98 3.25N 8615.09W 295.92 2.21N 8633.47W 297.59 2.88S 8662.34W 303.68 11.85S 8686.30W 313.48 13001.14 8735.27 8673.27 79 37 S 51.81 W 46.42 13030.44 8743.16 8681.16 69 4 S 45.66 W 41.27 13064.09 8758.07 8696.07 58 21 S 35.81 W 41.23 13096.99 8777.33 8715.33 50 0 S 27.02 W 33.33 13128.97 8798.23 8736.23 48 31 S 17.36 W 23.34 28.19S 8712.46W 330.72 46.74S 8733.65W 349.98 69.45S 8753.37W 373.37 92.10S 8767.33W 396.49 114.48S 8776.49W 419.18 13159.24 8818.07 8756.07 49 34 S 14.19 W 8.64 13189.54 8837.58 8775.58 50 16 S 12.78 W 4.24 13225.82 8860.89 8798.89 49 45 S 11.38 W 3.29 13252.44 8878.20 8816.20 49 7 S 10.50 W 3.42 13285.59 8900.16 8838.16 47 54 S 10.32 W 3.73 136.48S 8782.69W 441.37 159.02S 8788.10W 464.09 186.20S 8793.92W 491.45 206.05S 8797.76W 511.43 230.48S 8802.24W 535.99 13309.72 8916.56 8854.56 46 29 S 9.09 W 6.94 13347.27 8942.97 8880.97 44 7 S 7.69 W 6.85 13370.97 8960.08 8898.08 43 24 S 5.14 W 8.02 13409.44 8988.25 8926.25 42 27 S 1.71 W 6.56 13441.77 9012.20 8950.20 41 57 S 4.32 W 5.63 247.92S 8805.23W 553.53 274.33S 8809.13W 580.06 290.61S 8810.96W 596.40 316.75S 8812.53W 622.58 338.44S 8813.67W 644.29 13467.97 9031.37 8969.37 43 56 S 2.59 W 8.79 13502.94 9056.33 8994.33 45 0 S 6.28 W 7.99 13526.00 9072.51 9010.51 45 50 S 9.20 W 9.74 356.25S 8814.74W 662.13 380.67S 8816.65W 686.60 396.94S 8818.86W 702.93 THE CALCULATION PROCEDURES ARE BASED ON THE USE OF THREE-DIMENSION MINIMUM CURVATURE METHOD. HORIZONTAL DISPLACEMENT = 8827.79 FEET AT SOUTH 87 DEG. 25 MIN. WEST AT MD = 13526 VERTICAL SECTION RELATIVE TO WELL HEAD VERTICAL SECTION COMPUTED ALONG 181.99 DEG. TIE-IN SURVEY AT 12,700.00' MD WINDOW POINT AT 12,813.09' MD PROJECTED SURVEY AT 13,526.00' MD ORIGINAL ARCO ALASKA~, INC. PBU / 3-24A 500292101501 NORTH SLOPE BOROUGH COMPUTATION DATE: 3/19/98 SPERRY-SUN DRILLING SERVICES PAGE 2 ANCHORAGE ALASKA DATE OF SURVEY: 022198 JOB NUMBER: AKMW80123 KELLY BUSHING ELEV. = 62.00 FT. OPERATOR: ARCO ALASKA INC INTERPOLATED VALUES FOR EVEN 1000 FEET OF MEASURED DEPTH TRUE SUB-SEA MEASD VERTICAL VERTICAL DEPTH DEPTH DEPTH 12700.00 8610.15 8548.15 13526.00 9072.51 9010.51 TOTAL RECTANGULAR COORDINATES MD-TVD VERTICAL NORTH/~OUTH EAST/WEST DIFFERENCE CORRECTION 12.07 S 8459.98 W 4089.85 396.94 S 8818.86 W 4453.49 363.64 THE CALCULATION PROCEDURES ARE BASED ON THE USE OF THREE-DIMENSION MINIMUM CURVATURE METHOD. SPERRY-SUN DRILLING SERVICES ANCHORAGE ALASKA PAGE 3 ARCO ALASKA, INC. PBU / 3-24A 500292101501 NORTH SLOPE BOROUGH COMPUTATION DATE: 3/19/98 DATE OF SURVEY: 022198 JOB NUMBER: AKMW80123 KELLY BUSHING ELEV. = 62.00 FT. OPERATOR: ARCO ALASKA INC INTERPOLATED VALUES FOR EVEN 100 FEET OF SUB-SEA DEPTH TRUE SUB-SEA TOTAL MEASD VERTICAL VERTICAL RECTANGULAR COORDINATES MD-TVD VERTICAL DEPTH DEPTH DEPTH NORTH/SOUTH EAST/WEST DIFFERENCE CORRECTION 12700.00 8610.15 8548.15 12775.95 8662.00 8600.00 13071.04 8762.00 8700.00 13227.53 8862.00 8800.00 12.07 S 8459.98 W 4.28 S 8514.92 W 74.25 S 8756.50 W 187.47 S 8794.17 W 4089.85 4113.95 24.10 4309.04 195.09 4365.53 56.49 13373.61 8962.00 8900.00 13511.00 9062.00 9000.00 13526.00 9072.51 9010.51 292.42 S 8811.13 W 386.35 S 8817.39 W 396.94 S 8818.86 W 4411.61 46.08 4449.00 37.39 4453.49 4.48 THE CALCULATION PROCEDURES USE A LINEAR INTERPOLATION BETWEEN THE NEAREST 20 FOOT MD (FROM MINIMUM CURVATURE) POINTS DRIllING S I~ I:::! ~.~ I I-- ~ S 19-Mar-98 AOGCC Lori Taylor 3001 Porcupine Drive Anchorage, AK 99501 Re: Distribution of Survey Data for Well 3-24A Dear Lori Taylor: Enclosed are two survey hard copies. Tie-on Survey: Window / Kickoff Survey: Projected Survey: 12,700.00' MD 12,813.09' MD 13,526.00' MD (if applicable) Please call me at 563-3256 if you have any questions or concerns. William T. Allen Survey Manager Attachment(s) 5631 Silverado Way, Suite G · Anchorage, Alaska 99518 ° (907) 563-3256 ° Fax (907) 563-7252 A Division of Dresser Industries, Inc. TONY KNOWLE$, GOVERNOR ALASi~A OIL AND GAS CONSERVATION COMMISSION 3001 PORCUPINE DRIVE ANCHORAGE, ALASKA 99501-3192 PHONE: (907) 279-1433 FAX: (907) 276-7542 Januarv 22. 1998 Erin M. Oba Engineering Supervisor ARCO Alaska, Inc. P O Box 100360 Anchorage, AK 99510-0360 aez Prudhoe Bav Unit 3-24A ARCO Alaska. Inc. Permit No. 98-06 Sur. Loc. 644'FSL. 522'FEL. Sec 10, T10N. R15E. UM Btmnholc Loc. 4345'FNL, 3732'FEL, Sec. 09. TION. RI5E. UM Dear Ms. Oba: Enclosed is thc approved application for permit to redrill thc above referenced well. Thc permit to rcdrill docs not exempt you from obtaining additional pcrmits rcquircd by lax',' from other governmental agencies, and does not authorize conducting drilling operations until all other required permitting determinations arc made. Blowout prevention equipment (BOPE) must be tested in accordance with 20 AAC 25 035. Sufficient notice (approximately' 24 hours) must bc givcn to atlow a representative of the Commission to witness a test of BOPE installed prior to drilling new hole. Notice max' be given bv contacting thc Co: m,~ petroleum field inspector on thc North Slope pager at 659-3607. David W~hnston Chairman ~ BY ORDER OF THE COMMISSION dlf/Enclosurcs CC~ Department of Fish & Game. Habitat Section w/o cncl. Department of Environmental Conservation w/o cncl. / 1. Type of request: AJte~ c~.~ ng Change ~pp~eved p~ograrn _ STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMMISL APPLICATION FOR SUNDRY APPROVALS Abandon _X Suspend _ Operation Shutdown _ Reenter suspended wetl_ Repair we~l _ Rugging _X Time exten,~ on _ Sbmutate _ Pu~ tubing __ Variance_ Perforate_ OU~e~ _ 2. Name of Operator. ARCO Alaska, Inc. 3. Address: P.O. Box 100360 Anchorage, AK 99510-0360 Location of well at surface: 644' FSL, 522' FEL, Sec 10, TION, R15E, UM Attop of productive interval: 654' FSL, 1424' FWL, Sec 9, TION, R15E, UM At effective depth: At total depth: 714' FSL, 919' FWL, Sec 9, TION, R15E, UM 5. Type of Well: Development _X Exploratory _ Stratagrap~c _ Service _ 6. Datum of elavation (DF or KB feet): 62' RKB 7. Unit or Prcgerty: Prudhoe Bay Unit 8. Well number: 3-24 9. Permit number. 83-139 10. APl number: 50-029-21015 11. Field/Pool: Prudhoe Bay Oil Pool 12. Present well condition summary Total Depth: measured 13600 feet true vertical 9218 feet Plugs (measured) Tagged PBTD at 13217' MD (10/18/96). Effective Depth: measured 13217 feet Junk (measured) true verlicat 8961 feet Casing Length Size Cemented Measured depth True vertical depth Conductor 81' Surface 2605' Production 12754' Liner 1105' 20" 1937# Poleset 81' 81' 13-3/8" 3600 Sx CS III & 2639' 2546' 550 Sx CS II 9-5/8" 500 Sx Class G & 12785' 8667' 250 Sx CS I 7" 327 Sx Class G 13595' 9212' Pedoration Depth measured 13064- 13091'; 13101 - 13156'; 13170- 13200'; [Partly Isolated by Fill / Sand Plug: 13216- 13221 '] true vertical 8858- 8877'; 8883- 8920'; 8930- 8950'; [Partly Isolated by Fill / Sand Plug: 8961 - 8964'] Tubing (size, grade, and measured depth) 5-1/2", 17#, 13 CR-80 Tbg @ 12378' MD; 4-1/2", 12.6#, 13 CR-80, Tbg @ 12508' MD. Packers and SSSV (type and measured depth) TIW HBBP Packer @ 12363' MD; Camco TRDP-1A SSSV @ 2088' MD. 13. Attachments 14. Estimated date for commencing operation Description summap/of proposal _X November, 1997 16. If proposal was verbally approved Name of approver Date approved 17. I hereby cert~ that the forgoing is true and correct to the best of my knowledge. Detailed operations program _ BOP sketch 15. Status of well classification as: Oil _X Gas I Service Suspended_ Title: Engineering Supervisor FOR COMMISSION USE ONLY Conditions of approval: Not~ Comission so representitive may witness Plug Integrety _ BOP test _ Location clearance _ Mechanical integrety test_ Subsequent form required 10-__ IApproval No. Approved by order of the Commissioner Form 10-403 Rev 06/15188 Commissioner Date SUBMIT IN TRIPLICATE STAT[~ OF ALASKA R E C E IV D ~'cASKA OIL AND GAS OONSE~VATION C~/IIVII$$1ON PERMIT TO DRILL JAN I'~[ !99~! 20 AAC 25.005 la. Type of Work Ddll_ Redrill X lb. Type o! Well Explorato~._ StratigrapJ~_0Jl & GaS r~L3{~ol~~: Re-Entry__ Deepen _ Service_ Development Gas__ Single Zone ~X P~CI~I;J~ Zone_ 2, Name of Operator 5.Datum Elevation (DF or KB) 10, Field and Pool ARCO Alaska, Inc. RKB 51' 3. Address 6. Property Designation P.O. Box 100360 Prudhoe Bay Field Anchorage, AK 99510-0360 ADL 28328 Prudhoe Bay Oil Pool 4. Location of well at surface 7. Unit or property Name 11. Type Bond (see 20 AAC 25.025) 644' FSL, 522' FEL, Sec 10, T10N, R15E, UM. Prudhoe Bay Unit Statewide At top of productive interval 8. Well number Number 654' FSL, 1424' FWL, Sec 9, T10N, R15E, UM. 3-24A #U-630610 At total depth 9. Approximate spud date Amount (Proposed) 4345' FNL, 3732' FEL, Sec 9, T10N, R15E, UM. January, 1998 $200,000 12. Distance to nearest I 13. Distance to nearest well 14. Number of acres in property 15. Proposed depth (MD and TVD) property line I No Close Approach 13470' MD / 9072' TVD 16. To be completed for deviated wells 17. Anticipated pressure (see 20 AAC 25.035(e)(2)) 3¥~.~'"-~1~¢' kickoff depth 12795' MD Maximum hole an~lle 81° Maximum surface 2800 psig At total depth (TVD) ¢4 '9072' ~'f/~ (,~ 18. Casing program Setting Depth Size Specification Top Bottom Quantity of cement Hole Casing Weight Grade Coupling Length MD TVD MD TVD (include stage data) 4-1/4" 3-3/16" 6.2 L-80 TCII 1000' 12470' 8453' 13470' 9072' 6 bbls ORiGi"" 19. To be completed for Redrill,Present well condition summaryRe'entry' and Deepen Operations. NAL Total depth: measured 13600 feet Plugs(measured) true vertical 9218 feet Effective depth: measured 13217 feet Junk (measured) true vertical 8961 feet Casing Length Size Cemented Measured depth True Vertical depth Conductor 81' 20" 1937# Poleset 81' 81' Surface 2605' 13-3/8" 3600 Sx CS II1 & 2639' 2546' 550 Sx CS II Production 12754' 9-5/8" 500 Sx Class G & 12785' 8667' 250 Sx CS I Liner 1105' 7" 327 Sx Class G 13595' 9212' Perforation depth: measured 13064 - 13091'; 13101 - 13156'; 13170 - 13200'; [Partly Isolated by Fill/Sand - 13216 - 13221'] true vertical 8858 - 8877'; 8883 - 8920'; 8930 - 8950'; [Partly Isolated by Fill / Sand: 8961 - 8964'] 20. Attachments Filing fee ~ Property plat _ BOP Sketch ~ Diverter Sketch _ Ddlling program ~ Ddlling fluid program __ Time vs depth plot _ Refraction analysis ~ Seabed report . 20 AAC 25.050 requirements _ 21. I hereby certify that the foregoing is true and correct to the best of my knowledge Signed ~'~~ ~/J. ~ Title Engineering Supervisor Date ' Commission Use Only Permit ..h[gmber J APInumber Approval date //~,~lO)g~ See cover letter for ~;:>- d3 ~' 50- ~::~,,?... ,~ -' ~ / O / ,~' - ~ / other requirements Conditions of approval Samples required _Yes L~'No Mud log required ' _ Yes .,~'_ No Hydrogen sulfide measures z~CYes _ No Directional survey required ~-'Yes _ No Required working pressure for BOPE _ 2M; _ 3M; _ SM; _ 10M; _ 15M X 3500 psi for CTU Other: ~o~roved by 0avid W. Johnston Commissioner the commission Date . Form 10-401 Rev. 7-24-89 licate DS 3-24A CT Sidetrack and Completion Intended Procedure Objective: Plugback existing wellbore. Directionally drill a high angle twin well from the existing wellbore. Complete with 3-3/16" cemented liner. Intended Procedure: Cement squeeze the current perforations and plugback the existing completion to - 12765' md. Mill window in 7" casing at --12795' md. Drill 10' of formation and perform a formation test to an equivalent mud weight of at least .5 ppg over the highest anticipated mud weight. Build angle to 81° at 40°/100' then drop angle to 21 °at TD. · Directionally drill twin well to access Zone 4/3 reserves. · Run memory CNL log. · Run and cement 3-3/16" liner to TD. Perforate selected intervals. Return well to production. January 9, 1998 ARCO ALASKA INC. Coiled Tubing Sidetrack 3-24A EOA Prudh0e Bay, Alaska ARCO ALASKA INC. Mag (+26 9) 8400 ........... -- -- -.- -- -- 8600 ........... ---- -- -- .-- -- -- 8800 .......... -- 9000 .......... -- .... 9200 ............ 1 MD 12700 46.8~ 5 6 Scale = linch ' 200 ft. Scale = linch · 150 ft. 1 5o co --4 ~ .ix[ .... 0 (yl 0 Cfi OJ .... o o o o o ~',,: ! ':' i ;i ?,~':'; ,:: ,",:', i),, I ,::~ ;, ,"::; 'I ,: :, ,i,! '::'/, '::,,; ::.?', "-'"~' 7 : .......... 150 :;::: ........ 300 8 TD 9010.0 TVD MD 13468 21.9~ O O O O O O O O C:~ARCOALK\03-24A\3-24AT3. DW2 January 05 1997 Jon Mapes 3-24AT3 0324ORTR I SURVEY CALCULATION WORKSHEET ,;ob N{,: True Relative to Wellhead Company: ARCO ALASKA INC. Ri~: D/S ~7 AFE No: Well: 3-24A Field: Pmdhoc Bay WOA BHi Rep: C;dculation Method: Minimum Cun'ature Mag. Declination: 28.520 Job Slarl Date: Vertical Sect. Plane: 181.991 degrees TRUE Grid Correctiom 1.616 Job End Dale: Sum' Measured From: MD from RKB, Total Grid Correction: 26.904 DLS per ( t't / m ) · TVD from Sca level ~62'~ Sur~'ey Sutwey Course incl. Hole Subsea Vertical Total Coordinates Dog l~cg No. Datc Del}th Length Angle Azimuth TVD Section N(+) / S(-) E(+) / W(-) Sc~'erit3 Comments ~t't) qft) (des) qtle~) ~l't') , front TIP Lat. (Y) Del,. (X) I 12700.0 46.82 277.78 8548.20 -12.08 -8459.98 1.) Tic in point. 2 12720.0 20.00 46.89 277.94 8561.88 I 1.41) - 10.08 -8474.44 {}.(¢8 3 ! 2750.0 3O.00 46.98 278.18 8582.36 28.60 -7.01 -8496.14 0.66 4 .1278{}.0 30.00 ' ' 47.08 278.41 8602.81 45.70 -3.84 -8517.86 0.65 ~ 12795.0 1.5."00 47.13 278.53 861_~.0, 54.20 '-2.231 }8528.73 0.67 2.) Kick off point. Set TF = -45°. ,, 6 '12810.0 15.1)0 48.74 276.41 8623.()7 63.00 -().78 -8539.77 15.1~1 3.) Continue Kickoff. TF = 0°. 7 12840.0 30.1)() 6(I.76 276.4 i' ' 8640.35 82.50 1.95 -8564,07 g 12870.0 30.00 72.76 276.41 8652.17 1()4.51) 5.02~ -8591.41 9 12885.(} 15.00 78.74 276.41 865, .86 116,10 6.64 -86(}5.85 39.87~4.) Set TF over to -90°. 10 12900.0 ! 5.{)0 78.81 270.29 8658.78 128.30 7.50 -8620.53 40.O2 I i 12930.0 .~0.()(} {' ' ' ~ 7 ~.,~0 258.07 8664.50 155.0~} 4.52 -8649.78 12 12935.0 5.00: 79.43 256.05 8665.42 159,70 3.42 -8654.57 39.79'5.) Maintain TF al -9()°. 13 12960.() 25.00 79.59 245~87 8669.98 183,70 -4.591 -8677.77 40.04 14 12990,0 3O.OO 80.21 233.70 8675.26 ~ 213.20 -19.43 -8703.24 39.99 15 i302'0.0 30.00 81.2~ 221.59 8680.11 . 242.10 -39.34 -8725.07 39"~99 16 13035.0 15.0(} 81.92 215.57 8682.31 256.00 -50.93 -8734.32 3.9.94 6.) Turn TF ovcr I.o 180°. 17 .... 13(}50.0 15.0()' 75.91 2 1'5.57 8685.19 269.50 -62.90 -8742.88 18 13080.0 30.00 63.91 21'5.57 ' 8695.48 295.20 -85.78 -8759.24 40.0~1 - 19 13110.0 ~0.(){ 51 I. 215.57 8711.39 318.40 i~}6.41 -8774 ()1~ 2(} 13135.0 25.00 41..92 215.57 8728.441 335.0(} -121 25 -8784.61 39.96 7.) Ma'intain TF al 180°. ....... 2~ 13140.(} 5.t)(} 41.62 215.57 8732.17 338. I( -123.95 -8786.5.1 22 13170.0 30,0{~ 39'.82 215.57 8754.91 356.00 -139.87 -8797.93 6.0t} I , , 23 132(~0.() "~ 8778 rS[ 73.21~ 155 ~0 -88{}8 89 ,,0..)(} 38,02 215.57 ..... ~ - . .... 24 13230.0 30.1)0 36.22 215.57 8802.17' 389.81 -169.93 -8819.42 , 25 13260.0 3().(){) 34.42 215,57 8826.64 405.61 -184.04 -8829.51 6.{}1} Sur~:cy Surx'c3' Course Incl. Hole Subsca Vertical Total Coordinates Dog L'c~z No. Date Depth Length Angle Azimuth TVD Section N(+) / S(-) E(+) / W(-) Sc¥crity Comments (fl) ~ft) tdc~) Ide~t lftt t'rom TIP Lat. (,Y,) Del}. IX,) (,dc~/100') 26 13290.0 3(I.1~0 32.62 215.57 8851.65 42(I.80 -197.51 -8839.15 6.00 27 13320.0 .a0.t}0 ~0.82 215.57 8877.17 435.20 -21{).34 -8848..~2' (,.Ill 28 13350.0 3o.11o 29.02 215.57 89o3.17 448.90 -222.51 -8857.02 29 13380.0 30.00 27.22 215.57 8929.63 461.8o -234.Ol -8865.25 (,.(1( 30 13410.0 30.00 25.42 215.57 8956.52 474.00 -244.83 -8872.99 6.t}l 31 13440.0 30.¢)0 23.62 215.57 8983.81 485.40 -254.96 -8880.23 , 32 13468.5 28.50 21.9'! 215 57 9()1().()9 495.40 -,.6.~.93 -8886.64 6.(11}8>) TD. 673.5 ft. from KOP to,'" -- DS 3-24A CT Sidetrack Proposed Wellbore Sketch 5-1/2" Tubing SWS Nipple 12341' Packer 12363' 7" Liner Top 1249O' Tbg Tail cut off @ 12378' Window cut in 7" @ ~ 12795 - 12800' f2" GLM'S Top of 3-1/2" Liner in 5-1/2" Tubing 9-5/8" Casing shoe @ 12785' 4.5" open hole with 3°5" liner cemented in place Existing perfs cmt. sqz'd TD @ ~1347O' 7" Csg. Shoe @ 13595' C T Drilling Wellhead De ...... ~ CT Injector Head Methanol Injection ~ Stuffing Box (Pack-Off), 10,000 psi Working Pressure 7" Riser Otis 7" WLA Quick Connect -'--- Alignment Guide Flange i= 7-1/16", 5M Ram Type Dual Gate BOPE Fire Resistant Flanged Kelly Hose to Dual HCR Man t~al Vah Choke Manifold \ Annular BOP (Hydril),7-1/16" ID 5,000 psi working pressure (3.5") Cutters or Combination Cutter/Blinds Slip / Pipe rams Manual Valves Drilling spool 7-1/16", 5M by 7-1/16", 5M Ram Type Dual Gate BOPE Manualover Hydraulic 7-1/16" ID with Pipe/Slip Rams Manual Master Valve 0.458' (5.5") 2" Pump-In Hanger Fire resistant Kelly Hose to Flange by Hammer up 1/4 Turn Valve on DS Hardline to Standpipe manifold rl 9-5/8" Annulus 13-3/8" Annulus Mu~ Tanks 60/40 [ I Trplx] Ext. Shop Fuel Boilers Water Pump Roor Fire Ext. I-ire Ext. /~Pipe rack EDOWell Drilling quipment Trailer Preferred Major Equipment Layout for CT Drilling · WELLPERMIT CHECKLISTCOMPANY ,,,z~ WELL NAME /¢,,~;,/' ,..~-~_~,~-/',,~ PROGRAM:expEidev/~redrll~servE]wellboresegFJann. disposalparareqD FIELD & POOL ~, ~ o,2~'~ INIT CLASS .~_ ~,,, ,/ -~:::;, '~// GEOL AREA ~:2 ? <::3 UNIT# //'~',~_,~ ON/OFF SHORE ADMINISTRATION 1. Permit fee attached ....................... 2. Lease number appropriate ................... 3. Unique well name and number .................. 4. Well located in a defined pool .................. 5. Well located proper distance from drilling unit boundary .... 6. Well located proper distance from other wells .......... 7. Sufficient acreage available in drilling unit ............ 8. If deviated, is wellbore plat included ............... 9. Operator only affected party ................... 10. Operator has appropriate bond in force ............. 11. Permit can be issued without conservation order ........ 12. Permit can be issued without administrative approval ...... 13. Can permit be approved before 15-day wait ........... ENGINEERING 14. Conductor string provided ................... Y N 15. Surface casing protects all known USDWs ........... Y N 16. CMT vol adequate to circulate on conductor & surf csg ..... Y N 17. CMT vol adequate to tie-in long string to surf csg ........ ,,~ 18. CMT will cover all known productive horizons .......... 19. Casing designs adequate for C, T, B & permafrost ....... 20. Adequate tankage or reserve pit ................. 21. If a re-drill, has a 10-403 for abandonment been approved....,Y_,.. N 22. Adequate wellbore separation proposed ............. Y(..y..~ N 23. If diverter required, does it meet regulations .......... ,--,. __ 24. Drilling fluid program schematic & equip list adequate ..... f,~N 25. BOPEs, do they meet regulation ................ 26. BOPE press rating appropriate; test to ~ ~ .psig. 27. Choke manifold complies w/APl RP-53 (May 84) ........ ~>~:: v'" 28. Work will occur without operation shutdown ........... 29. Is presence of H2S gas probable ................. REMARKS GEOLOGY 30. Permit can be issued w/o hydrogen sulfide measures ..... 31. Data presented on potential overpressure zones ....... ~N ' """ 32. Seismic analysis of shallow gas zones ............. 33. Seabed condition survey (if off-shore) ............. N 34. Contact name/phone for we.ekly.pro~iress repo. rts ? Y N lexp~ora~ory on~yj ...... '/ GEOLOGY: ENGINEERING: COMMISSION: JDH _.'""~ " co Comments/Instructions: © :z HOW/lit - A:\FORMS\cheklist rev 09/97 Well History File APPENDIX Information of detailed nature that is not particularly germane to the Well Permitting Process but is part of the history, file. To improve the readability of the Well History file and to simplify finding information, information of this nature is accumulated at the end of the file under APPENDIX. No special effort has been made to chronologically organize this category of information. Sperry-Sun Drilling Services LIS Scan Utility Thu May 07 09:23:31 1998 Reel Header Service name ............. LISTPE Date ..................... 98/05/07 Origin ................... STS Reel Name ................ UNKNOWN Continuation Number ...... 01 Previous Reel Name ....... UNKNOWN Comments ................. STS LIS Writing Library. Scientific Technical Services Tape Header Service name ............. LISTPE Date ..................... 98/05/07 Origin ................... STS Tape Name ................ UNKNOWN Continuation Number ...... 01 Previous Tape Name ....... UNKNOWN Comments ................. STS LIS Writing Library. Scientific Technical Services Physical EOF Comment Record TAPE HEADER PRUDHOE BAY UNIT MWD/MAD LOGS WELL NAME: API NUMBER: OPERATOR: LOGGING COMPANY: TAPE CREATION DATE: JOB DATA JOB NUMBER: LOGGING ENGINEER: OPERATOR WITNESS: SURFACE LOCATION SECTION: TOWNSHIP: RANGE: FNL: FSL: FEL: FWL: ELEVATION (FT FROM MSL 0) KELLY BUSHING: DERRICK FLOOR: GROUND LEVEL: WELL CASING RECORD MWD RUN 6 AK-MW-80123 D. LABRECQUE GARY GOODRIC 3-24A 500292101501 ARCO ALASKA, INC. SPERRY-SUN DRILLING SERVICES 07-MAY-98 MWD RUN 7 AK-MW-80123 D. LABRECQUE A. BASS MWD RUN 8 AK-MW- 80123 D. LABRECQUE A. BASS 10 i0N 15E 644 522 .00 .00 .00 1ST STRING 2ND STRING 3RD STRING PRODUCTION STRING REMARKS: OPEN HOLE CASING DRILLERS BIT SIZE (IN) SIZE (IN) DEPTH (FT) 3.750 13531.0 1. ALL DEPTHS ARE MEASURED DEPTHS (MD) UNLESS OTHERWISE NOTED. 2. MWD RUNS 1 THROUGH 5 CONTAIN NO VALID DATA AND ARE NOT PRESENTED. 3. MWD RUNS 6,7, AND 8 ARE DIRECTIONAL WITH SCINTILLATION TYPE GAMMA RAY (NGP) . 4. GAMMA RAY DATA (SGRD) USED FOR DEPTH CORRECTION WAS ACQUIRED ABOVE THE KICK OFF POINT FOR WELL 3-24A. THIS DATA WILL NOT BE INCLUDED IN THE FINAL EDITED MERGED GAMMA RAY CURVE. APPROVED AS PER PHONE CONVERSATION BETWEEN MARSHALL MUNYAK OF SPERRY-SUN DRILLING SERVICES AND BECKY WATSON OF ARCO ALASKA, INC. ON 6 MAY, 1998. 5. THIS WELL REACHED A TOTAL DEPTH (TD) OF 13531'MD, 9014'SSTVD. SROP = SMOOTHED RATE OF PENETRATION WHILE DRILLING. SGRD = SMOOTHED GAMMA RAY. $ File Header Service name ............. STSLIB.001 Service Sub Level Name... Version Number ........... 1.0.0 Date of Generation ....... 98/05/07 Maximum Physical Record..65535 File Type ................ LO Previous File Name ....... STSLIB.000 Comment Record FILE HEADER FILE NUMBER: 1 EDITED MERGED MWD Depth shifted and clipped curves; all bit runs merged. DEPTH INCREMENT: .5000 FILE SUMMARY PBU TOOL CODE START DEPTH STOP DEPTH GR 12802.0 13495.0 ROP 12826 . 5 13528 . 5 $ BASELINE CURVE FOR SHIFTS: CURVE SHIFT DATA (MEASURED DEPTH) BASELINE DEPTH GR 12384.5 12381.0 12390.5 12387.0 12394.5 12391.5 12404.0 12400.0 12409.5 12406.0 12412.0 12410.5 EQUIVALENT UNSHIFTED DEPTH 12414 12429 12431 12436 12438 12439 12441 12443 12446 12449 12455 12461 12485 12487 12488 12490 12493 12496 12498 12500 12502 12504 12507. 12510. 12809. 12811. 12813. 13528. $ 5 5 5 0 0 5 5 5 0 0 5 5 5 0 0 5 0 0 0 5 5 5 5 5 5 5 5 5 MERGED DATA SOURCE PBU TOOL CODE MWD MWD MWD $ REMARKS: 12412 5 12426 0 12427 5 12432 0 12433 5 12436 0 12438 5 12440 5 12442 5 12446 5 12453 5 12457.5 12482 0 12484 0 12485 5 12487 0 12488 5 12493 0 12495.0 12496.5 12500.5 12502.0 12505.0 12506.0 12808.0 12811.5 12815.0 13530.0 BIT RUN NO MERGE TOP MERGE BASE 6 12828.0 13120.0 7 13120.0 13381.0 8 13381.0 13530.0 MERGED MAIN PASS. $ Data Format Specification Record Data Record Type .................. 0 Data Specification Block Type ..... 0 Logging Direction ................. Down Optical log depth units ........... Feet Data Reference Point .............. Undefined Frame Spacing ..................... 60 .liN Max frames per record ............. Undefined Absent value ...................... -999.25 Depth Units ....................... Datum Specification Block sub-type...0 Name Service Order Units Size Nsam Rep Code Offset Channel DEPT FT 4 1 68 0 1 ROP MWD FT/H 4 1 68 4 2 GR MWD AAPI 4 1 68 8 3 First Name Min Max Mean Nsam Reading Last Reading DEPT 12802 13528.5 13165.2 1454 ROP 13.79 1213.55 70.9297 1405 GR 0 896.6 80.1953 1388 12802 12826.5 12802 13528.5 13528.5 13495.5 First Reading For Entire File .......... 12802 Last Reading For Entire 'File ........... 13528.5 File Trailer Service name ............. STSLIB.001 Service Sub Level Name... Version Number ........... 1.0.0 Date of Generation ....... 98/05/07 Maximum Physical Record..65535 File Type ................ LO Next File Name ........... STSLIB.002 Physical EOF File Header Service name ............. STSLIB.002 Service Sub Level Name... Version Number ........... 1.0.0 Date of Generation ....... 98/05/07 Maximum Physical Record..65535 File Type ................ LO Previous File Name ....... STSLIB.001 Comment Record FILE HEADER FILE NUMBER: 2 RAW MWD Curves and log header data for each bit run in separate files. BIT RUN NUMBER: 6 DEPTH INCREMENT: .5000 FILE SUMMARY VENDOR TOOL CODE START DEPTH STOP DEPTH GR 12800 . 5 13092 . 0 ROP 12828 . 0 13119 . 5 $ LOG HEADER DATA DATE LOGGED: 19-FEB-98 SOFTWARE SURFACE SOFTWARE VERSION: MSC 1.32 DOWNHOLE SOFTWARE VERSION: PCG 5.74 DATA TYPE (MEMORY OR REAL-TIME): MEMORY TD DRILLER (FT) : 13120.0 TOP LOG INTERVAL (FT) : 12828.0 BOTTOM LOG INTERVAL (FT) : 13120.0 BIT ROTATING SPEED (RPM) : HOLE INCLINATION (DEG MINIMUM ANGLE: 50.0 MAXIMUM ANGLE: 87.8 TOOL STRING (TOP TO BOTTOM) VENDOR TOOL CODE TOOL TYPE TOOL NUMBER PCD 3.00 NGP $ NATURAL GAMMA PROBE BOREHOLE AND CASING DATA OPEN HOLE BIT SIZE (IN): DRILLER'S CASING DEPTH (FT): BOREHOLE CONDITIONS MUD TYPE: MUD DENSITY (LB/G) : MUD VISCOSITY (S): MUD PH: MUD CHLORIDES (PPM): FLUID LOSS (C3): RESISTIVITY (OHMM) AT TEMPERATURE (DEGF) MUD AT MEASURED TEMPERATURE (MT): MUD AT MAX CIRCULATING TERMPERATURE: MUD FILTRATE AT MT: MUD CAKE AT MT: NEUTRON TOOL MATRIX: MATRIX DENSITY: HOLE CORRECTION (IN): TOOL STANDOFF (IN): EWR FREQUENCY (HZ): REMARKS: $ Data Format Specification Record Data Record Type .................. 0 Data Specification Block Type ..... 0 Logging Direction ................. Down Optical log depth units ........... Feet Data Reference Point .............. Undefined Frame Spacing ..................... 60 .liN Max frames per record ............. Undefined Absent value ...................... -999.25 Depth Units ....................... Datum Specification Block sub-type...0 PCG 9 3.750 3.8 FLO PRO 8.80 .0 9.0 8.0 .000 .000 .000 .000 .3 Name Service Order Units Size Nsam Rep Code Offset Channel DEPT FT 4 1 68 0 1 GR MWD 6 AAPI 4 1 68 4 2 ROP MWD 6 FT/H 4 1 68 8 3 58.6 First Name Min Max Mean Nsam Reading DEPT 12800.5 13119.5 12960 639 12800.5 GR 30.08 896.6 147.174 584 12800.5 ROP 14.48 1100.56 45.3524 584 12828 Last Reading 13119.5 13092 13119.5 First Reading For Entire File .......... 12800.5 Last Reading For Entire File ........... 13119.5 File Trailer Service name ............. STSLIB.002 Service Sub Level Name... Version Number ........... 1.0.0 Date of Generation ....... 98/05/07 Maximum Physical Record..65535 File Type ' LO Next File Name ........... STSLIB.003 Physical EOF File Header Service name ............. STSLIB.003 Service Sub Level Name... Version Number ........... 1.0.0 Date of Generation ....... 98/05/07 Maximum Physical Record..65535 File Type ................ LO Previous File Name ....... STSLIB.002 Comment Record FILE HEADER FILE NUMBER: 3 RAW MWD Curves and log header data for each bit run in separate files. BIT RUN NUMBER: 7 DEPTH INCREMENT: .5000 FILE SUMMARY VENDOR TOOL CODE START DEPTH STOP DEPTH GR 13090 . 0 13353 . 0 ROP 13116 . 0 13380 . 5 $ LOG HEADER DATA DATE LOGGED: 20-FEB-98 SOFTWARE SURFACE SOFTWARE VERSION: MSC 1.32 DOWNHOLE SOFTWARE VERSION: PCG 5.74 DATA TYPE (MEMORY OR REAL-TIME): MEMORY TD DRILLER (FT) : 13381.0 TOP LOG INTERVAL (FT) : 13120.0 BOTTOM LOG INTERVAL (FT) : 13381.0 BIT ROTATING SPEED (RPM) : HOLE INCLINATION (DEG MINIMUM ANGLE: 42.0 MAXIMUM ANGLE: 44.1 TOOL STRING (TOP TO BOTTOM) VENDOR TOOL CODE TOOL TYPE NGP NATURAL GAMMA PROBE $ BOREHOLE AND CASING DATA OPEN HOLE BIT SIZE (IN): DRILLER'S CASING DEPTH (FT) : BOREHOLE CONDITIONS MUD TYPE: PCD 3.00 TOOL NI/MBER PCG 9 3.750 3.8 FLO PRO MUD DENSITY (LB/G) : MUD VISCOSITY (S): MUD PH: MUD CHLORIDES (PPM) : FLUID LOSS (C3) : RESISTIVITY (OHMM) AT TEMPERATURE (DEGF) MUD AT MEASURED TEMPERATURE (MT): MUD AT MAX CIRCULATING TERMPERATURE: MUD FILTRATE AT MT: MUD CAKE AT MT: NEUTRON TOOL MATRIX: MATRIX DENSITY: HOLE CORRECTION (IN): TOOL STANDOFF (IN): EWR FREQUENCY (HZ): REMARKS: $ Data Format Specification Record Data Record Type .................. 0 Data Specification Block Type ..... 0 Logging Direction ................. Down Optical log depth units ........... Feet Data Reference Point .............. Undefined Frame Spacing ..................... 60 .liN Max frames per record ............. Undefined Absent value ...................... -999.25 Depth Units ....................... Datum Specification Block sub-type...0 8.80 .0 9.5 6.8 .000 .000 .000 .000 .3 Name Service Order Units Size Nsam Rep Code Offset Channel DEPT FT 4 1 68 0 1 GR MWD 7 AAPI 4 1 68 4 2 ROP MWD 7 FT/H 4 1 68 8 3 60.9 First Name Min Max Mean Nsam Reading DEPT 13090 13380.5 13235.2 582 13090 GR 0 114.89 35.0826 527 13090 ROP 18.2 582.92 91.1793 530 13116 Last Reading 13380.5 13353 13380.5 First Reading For Entire File .......... 13090 Last Reading For Entire File ........... 13380.5 File Trailer Service name ............. STSLIB.003 Service Sub Level Name... Version Number ........... 1.0.0 Date of Generation ....... 98/05/07 Maximum Physical Record..65535 File Type ................ LO Next File Name ........... STSLIB.004 Physical EOF File Header Service name ............. STSLIB.004 Service Sub Level Name... Version Number ........... 1.0.0 Date of Generation ....... 98/05/07 Maximum Physical Record..65535 File Type ................ LO Previous File Name ....... STSLIB.003~ Comment Record FILE HEADER FILE NUMBER: 4 RAW MWD Curves and log header data for each bit run in separate files. BIT RUN NUMBER: 8 DEPTH INCREMENT: .5000 FILE SUMMARY VENDOR TOOL CODE START DEPTH GR 13359.0 ROP 13380.0 $ LOG HEADER DATA DATE LOGGED: SOFTWARE SURFACE SOFTWARE VERSION: DOWNHOLE SOFTWARE VERSION: DATA TYPE (MEMORY OR REAL-TIME): TD DRILLER (FT): TOP LOG INTERVAL (FT) : BOTTOM LOG INTERVAL (FT) : BIT ROTATING SPEED (RPM) : HOLE INCLINATION (DEG MINIMUM ANGLE: MAXIMUM ANGLE: STOP DEPTH 13497.0 13530.0 TOOL STRING (TOP TO BOTTOM) VENDOR TOOL CODE TOOL TYPE NGP NATURAL GAMMA PROBE $ BOREHOLE AND CASING DATA OPEN HOLE BIT SIZE (IN): DRILLER'S CASING DEPTH (FT): BOREHOLE CONDITIONS MUD TYPE: MUD DENSITY (LB/G): MUD VISCOSITY (S) : MUD PH: MUD CHLORIDES (PPM) : FLUID LOSS (C3) : RESISTIVITY (OHMM) AT TEMPERATURE (DEGF) MUD AT MEASURED TEMPERATURE (MT): MUD AT MAX CIRCULATING TERMPERATURE: MUD FILTRATE AT MT: 21-FEB-98 MSC 1.32 PCG 5.74 MEMORY 13530.0 13381.0 13530.0 PCD 3.00 42.0 45.7 TOOL NUMBER PCG 9 3.750 3.8 FLO PRO 8.80 .0 9.0 7.2 .000 .000 .000 60.9 MUD CAKE AT MT: NEUTRON TOOL MATRIX: MATRIX DENSITY: HOLE CORRECTION (IN): TOOL STANDOFF (IN) : EWR FREQUENCY (HZ): REMARKS: $ Data Format Specification Record Data Record Type .................. 0 Data Specification Block Type ..... 0 Logging Direction ................. Down Optical log depth units ........... Feet Data Reference Point .............. Undefined Frame Spacing ..................... 60 .liN Max frames per record ............. Undefined Absent value ...................... -999.25 Depth Units ....................... Datum Specification Block sub-type...0 .000 .3 Name Service Order Units Size Nsam Rep Code Offset Channel DEPT FT 4 1 68 0 1 GR MWD 8 AAPI 4 1 68 4 2 ROP MWD 8 FT/H 4 1 68 8 3 First Name Min Max Mean Nsam Reading DEPT 13359 13530 13444.5 343 13359 GR 10.66 69.7 27.7404 277 13359 ROP 13.79 1213.55 99.1898 301 13380 Last Reading 13530 13497 13530 First Reading For Entire File .......... 13359 Last Reading For Entire File ........... 13530 File Trailer Service name ............. STSLIB.004 Service Sub Level Name... Version Number ........... 1.0.0 Date of Generation ....... 98/05/07 Maximum Physical Record..65535 File Type ................ LO Next File Name ........... STSLIB.005 Physical EOF Tape Trailer Service name ............. LISTPE Date ..................... 98/05/07 Origin ................... STS Tape Name ................ UNKNOWN Continuation Number ...... 01 Next Tape Name ........... UNKNOWN Comments ................. STS LIS Writing Library. Technical Services Reel Trailer Service name ......... ' .... LISTPE Date ..................... 98/05/07 Origin ................... STS Reel Name ................ UNKNOWN Continuation Number ...... 01 Next Reel Name ........... UNKNOWN Comments ................. STS LIS Writing Library. Technical Services Scientific Scientific Physical EOF Physical EOF End Of LIS File * ALASKA COMPUTING CENTER * . * ....... SCHLUMBERGER ....... COMPANY NAME : ARCO ALASKA INC. WELL NAME : DS 3-24A FIELD NAME : PRUDHOE BAY BOROUGH : NORTH SLOPE STATE : ALASKA API NUMBER : 500292101501 REFERENCE NO : 98359 LIS Tape Verification Listing Schlumberger Alaska Computing Center 4-NOV-1998 12:37 PAGE: **** REEL HEADER **** SERVICE NA~IE : EDIT DATE : 98/11/ 4 ORIGIN : FLIC REEL NAME : 98359 CONTINUATION # : PREVIOUS REEL : CO~4~lVT : ARCO ALASKA INC, D.S. 3-24A, PRUDHOE BAY, 50-029-21015-01 **** TAPE HEADER **** SERVICE NA~E : EDIT DATE : 98/11/ 4 ORIGIN : FLIC TAPE NAME : 98359 CONTINUATION # : 1 PREVIOUS TAPE : COMMENT : ARCO ALASKA INC, D.S. 3-24A, PRUDHOE BAY, 50-029-21015-01 TAPE HEADER Prudhoe Bay CASED HOLE WIRELINE LOGS WELL NAME: API NUMBER: OPERATOR: LOGGING COMPANY: TAPE CREATION DATE: JOB NUMBER: LOGGING ENGINEER: OPERATOR WITNESS: SURFACE LOCATION SECTION: TOWNSHIP: RANGE: FNL: FSL: FEL: FWL: ELEVATION (FT FROM MSL O) KELLY BUSHING: DERRICK FLOOR: GROUND LEVEL: WELL CASING RECORD DS 3-24A 500292101501 ARCO Alaska Inc. SCHLUMBERGER WELL SERVICES 4 -NOV- 98 98359 S Thornhill G Sarber 10 1 ON 1SE 644 522 OPEN HOLE CASING DRILLERS CASING BIT SIZE (IN) SIZE (IN) DEPTH (FT) WEIGHT (LB/FT) 1ST STRING 3. 750 3. 188 13531.0 2ND STRING 3RD STRING PRODUCTION STRING CURVE SHIFT DATA - ALL PASSES TO STANDARD (MEASURED DEPTH) LIS Tape Verification Listing Schlumberger Alaska Computing Center 4-NOV-1998 12:37 BASELINE CURVE FOR SHIFTS LDWG TOOL CODE: MWD LDWG CURVE CODE: GR RUN NUMBER: PASS NUMBER: DATE LOGGED: 21 -FEB- 98 LOGGING COMPANY: SPERRY-SUN BASELINE DEPTH 88888.0 13443.0 13424.5 13412.0 13408.0 13396.0 13394 0 13392 0 13389 5 13379 0 13365 0 13363 5 13357 0 13356 0 13355 5 13353 0 13343 5 13343 0 13337.5 13337.0 13334.0 13327.5 13327.0 13322.5 13321.5 13320.0 13319.0 13304.5 13298.0 13296.5 13296.0 13294.5 13282.0 13277.5 13276.0 13258.5 13249.0 13248.5 13232.5 13227.5 13216.5 13215.5 13212.0 13207.5 13205.5 .......... EQUIVALENT UNSHIFTEDDEPTH .......... GRCH TDTP .............. 88896.0 88894.0 13432.5 13418.0 13403.0 13400.0 13396.5 13385.5 13372.5 13364.5 13362.0 13344.0 13338.0 13335.5 13327.0 13321.5 13319.0 13306.0 13296.5 13295.0 13281.5 13276.5 13258.5 13247.5 13232.0 13226.0 13217.0 13206.0 13449.0 13432.5 13418.0 13400.0 13385.0 13372.5 13364.5 13362.0 13344.0 13338.0 13335.5 13327.0 13322.0 13319.0 13306.0 13296.5 13295.0 13281.5 13274.5 13259.5 13248.0 13232.0 13226.0 13216.5 13210.5 13203.0 PAGE: LIS Tape Verification Listing Schlumberger Alaska Computing Center 13205.0 13202.0 13195.5 13187.0 13178.5 13178.0 13175.0 13172.5 13172.0 13170.0 13169.0 13162.5 13160.0 13159.0 13157.0 13151.5 13141.5 13140.0 13138.0 13135.5 13134.5 13125.5 13116.5 13114.5 13114.0 13100.0 13097.5 13096.0 13095.0 13093.0 13090.0 13088.5 13087.0 13086.0 13081 0 13080 0 13078 5 13076 5 13075 5 13073 0 13071 5 13070 5 13069 0 13063 0 13061 0 13059.0 13057.5 13054.5 13051.0 13045.0 13043.5 13040.0 13039.0 13038.5 13036.5 13032.5 13203.0 13201.5 13194.0 13187.0 13177.5 13174.0 13172.0 13168.5 13161.5 13159.0 13158.0 13152.5 13141.0 13140.0 13139.0 13136.0 13129.5 13118.5 13115.5 13103.5 13101.5 13099.5 13096.5 13091.5 13084.5 13082.5 13081.0 13076.5 13074.5 13067.0 13065.5 13062.0 13059.0 13055.5 13049.5 13048.5 13045.0 13042.0 13036.0 13201.5 13194.5 13187.0 13177.5 13174.0 13172.0 13169.5 13161.5 13159.0 13158.0 13152.0 13141.5 13140.0 13139.0 13136.5 13129.5 13118.5 13115.5 13103.5 13101.5 13099.5 13096.5 13091.5 13084.5 13082.5 13081.0 13076.5 13074.5 13065.5 13048.0 13045.0 13042.0 13039.5 4-NOV-1998 12:37 PAGE: LIS Tape Verification Listing Schlumberger Alaska Computing Center 4-NOV-1998 12:37 13032.0 13027.5 13027.0 13023.5 13023.0 13017.5 13017.0 13010.5 13006.5 13003.5 12998 0 12990 0 12983 5 12974 5 12974 0 12970 0 12967 5 12967 0 12962 0 12960 5 12952 5 12952 0 12938 5 12938 0 12933 0 12911 0 12901 0 12900 5 12894 5 12894.0 12889.5 12885.5 12884.5 12883.0 12878.0 12877.5 12874.0 12870.5 12869.5 12864.0 12859.5 12857.0 12853.0 12851.0 12846.0 12845.0 12840.5 12840.0 12837.0 12836.5 12832.0 12829.0 100.0 $ 13032.0 13027.0 13021.0 13015.5 13011.5 13008.0 13003.0 12995.5 12991.5 12981.5 12978.5 12974.0 12968.0 12959.0 12944.5 12938.5 12916.5 12906.0 12900.5 12895.5 12891.0 12888.5 12883.0 12879.0 12875.0 12870.0 12865.0 12862.0 12858.5 12856.0 12850.5 12845.0 12842.0 12837.0 12833.5 104.5 13036.0 13032.0 13027.0 13021.0 13015.5 13011.5 13003.0 12995.5 12991.5 12981.5 12973.5 12967.5 12959.0 12945.0 12938.5 12916.5 12906.5 12900.5 12895.5 12891.0 12883.0 12879.0 12875.0 12870.0 12865.0 12862.0 12858.0 12856.0 12850.5 12845.0 12842.0 105.0 PAGE: REMARKS: CONTAINED HEREIN IS THE LDWG FORMATTED CASED HOLE TDTP LIS Tape Verification Listing Schlumberger Alaska Computing Center 4-NOV-1998 12:37 DATA AQUIRED ON BP EXPLORATION'S DS 3-24A WELL. THE DEPTH SHIFTS SHOWN ABOVEREFLECT CORRELATIONS BETWEEN GRCH BASE PASS #1 AND THE MWD GA~MARAY, ALSO BASE PASS #1 SIGMA AND THE MWDGAM~ARAY, CARRYING ALL TDTP CURVES WITH THE SIGMA SHIFTS. $ PAGE: **** FILE HEADER **** FILE NAME : EDIT .001 SERVICE : FLIC VERSION : O01CO1 DATE : 98/11/ 4 MAX REC SIZE : 1024 FILE TYPE : LO LAST FILE : FILE HEADER FILE NUMBER: 1 EDITED CURVES Depth shifted and clipped curves for each pass in separate files. PASS NUMBER: 1 DEPTH INCREMENT: 0.5000 FILE SUMMARY LDWG TOOL CODE START DEPTH- STOP DEPTH GRCH 13456.0 12832.5 TDTP 13467.0 12832 . $ $ CURVE SHIFT DATA - PASS TO PASS (MEASURED DEPTH) BASELINE CURVE FOR SHIFTS LDWG CURVE CODE: PASS NUFiBER : BASELINE DEPTH $ .......... EQUIVALENT UNSHIFTED DEPTH .......... GRCH TDTP .............. REMARKS: THIS FILE CONTAINS CASED HOLE TDTP BASE PASS #1. THERE ARE NO PASS TO PASS SHIFTS APPLIED TO THIS DATA. $ LIS FORMAT DATA LIS Tape Verification Listing Schlumberger Alaska Computing Center 4-NOV-1998 12:37 PAGE: 6 ** DATA FORMAT SPECIFICATION RECORD ** ** SET TYPE - 64EB ** TYPE REPR CODE VALUE 1 66 0 2 66 0 3 73 92 4 66 1 5 66 6 73 7 65 8 68 0.5 9 65 FT 11 66 11 12 68 13 66 0 14 65 FT 15 66 68 16 66 1 0 66 0 ** SET TYPE - CHAN ** NAME SERV UNIT SERVICE API API API API FILE NUMB NUMB SIZE REPR PROCESS ID ORDER # LOG TYPE CLASS MOD NUM~ SAMP ELEM CODE (HEX) DEPT FT 1171593 O0 000 O0 0 1 1 1 4 68 0000000000 SIGM TDTP CU 1171593 O0 000 O0 0 1 1 1 4 68 0000000000 TPHI TDTP PU-S 1171593 O0 000 O0 0 1 1 1 4 68 0000000000 SBHF TDTP CU 1171593 O0 000 O0 0 1 1 1 4 68 0000000000 SBHN TDTP CU 1171593 O0 000 O0 0 1 1 1 4 68 0000000000 SIGC TDTP CU 1171593 O0 000 O0 0 1 1 1 4 68 0000000000 SIBH TDTP CU 1171593 O0 000 O0 0 1 1 1 4 68 0000000000 TRAT TDTP 1171593 O0 000 O0 0 1 ! 1 4 68 0000000000 SDSI TDTP CU 1171593 O0 000 O0 0 1 1 1 4 68 0000000000 BACK TDTP CPS 1171593 O0 000 O0 0 1 1 1 4 68 0000000000 FBAC TDTP CPS 1171593 O0 000 O0 0 1 1 1 4 68 0000000000 TCAN TDTP CPS 1171593 O0 000 O0 0 1 1 1 4 68 0000000000 TCAF TDTP CPS 1171593 O0 000 O0 0 1 1 1 4 68 0000000000 TCND TDTP CPS 1171593 O0 000 O0 0 1 1 1 4 68 0000000000 TCFD TDTP CPS 1171593 O0 000 O0 0 1 1 1 4 68 0000000000 TSCN TDTP CPS 1171593 O0 000 O0 0 1 1 1 4 68 0000000000 TSCF TDTP CPS 1171593 O0 000 O0 0 1 1 1 4 68 0000000000 INND TDTP CPS 1171593 O0 000 O0 0 1 1 1 4 68 0000000000 INFD TDTP CPS 1171593 O0 000 O0 0 1 1 1 4 68 0000000000 GRCH TDTP GAPI 1171593 O0 000 O0 0 1 1 1 4 68 0000000000 TENS TDTP LB 1171593 O0 000 O0 0 1 1 1 4 68 0000000000 CCL TDTP V 1171593 O0 000 O0 0 1 1 1 4 68 0000000000 GR MWD GAPI 1171593 O0 000 O0 0 1 1 1 4 68 0000000000 LIS Tape Verification Listing Schlumberger Alaska Computing Center 4-NOV-1998 12:37 PAGE: ** DATA ** DEPT. 13480.000 SIGM. TDTP -999.250 TPHI.TDTP SBHN. TDTP -999.250 SIGC. TDTP -999.250 SIBH. TDTP SDSI.TDTP -999.250 BACK. TDTP -999.250 FBAC. TDTP TCAF. TDTP -999.250 TCND. TDTP -999.250 TCFD. TDTP TSCF. TDTP -999.250 INND. TDTP -999.250 INFD. TDTP T~NS. TDTP -999.250 CCL.TDTP -999.250 GR.MWD DEPT. 12802.000 SIGM. TDTP -999.250 TPHI.TDTP SBHN. TDTP -999.250 SIGC. TDTP -999.250 SIBH. TDTP SDSI.TDTP -999.250 BACK. TDTP -999.250 FBAC. TDTP TCAF. TDTP -999.250 TCND.TDTP -999.250 TCFD. TDTP TSCF. TDTP -999.250 INND.TDTP -999.250 INFD. TDTP TENS. TDTP -999.250 CCL.TDTP -999.250 GR.MWD -999. 250 SBHF. TDTP -999. 250 TRAT. TDTP -999. 250 TCAN. TDTP -999. 250 TSCN. TDTP -999. 250 GRCH. TDTP 26. 650 -999.250 SBHF. TDTP -999.250 TRAT. TDTP -999.250 TCAN. TDTP -999.250 TSCN. TDTP -999.250 GRCH. TDTP 368.910 -999.250 -999.250 -999.250 -999.250 -999.250 -999.250 -999.250 -999.250 -999.250 -999.250 ** END OF DATA ** **** FILE TRAILER **** FILE NA~ZE : EDIT .001 SERVICE : FLIC VERSION · O01CO1 DATE · 98/11/ 4 MAX REC SIZE : 1024 FILE TYPE : LO LAST FILE : **** FILE HEADER **** FILE NA~ZE : EDIT .002 SERVICE ' FLIC VERSION · O01CO1 DATE : 98/11/ 4 MAX REC SIZE : 1024 FILE TYPE : LO LAST FILE : FILE HEADER FILE NUMBER: 2 EDITED CURVES Depth shifted and clipped curves for each pass in separate files. PASS NUMBER: 2 DEPTH INCREMFa%rT: 0.5000 FILE SUF~V~ARY LDWG TOOL CODE START DEPTH GRCH 13452.5 TDTP 13467.0 STOP DEPTH 12821.5 12821.5 LIS Tape Verification Listing Schlumberger Alaska Computing Center 4-NOV-1998 12:37 PAGE: $ CURVE SHIFT DATA - PASS TO PASS (MEASURED DEPTH) BASELINE CURVE FOR SHIFTS LDWG CURVE CODE: GRCH PASS--ER: 1 BASELINE DEPTH 88888 0 13444 0 13439 0 13437 5 13437 0 13435 0 13427 5 13423 0 13419 0 13402 0 13397 0 13395 0 13380 0 13378 5 13374.5 13370.0 13365.5 13362.0 13360.5 13357.5 13355.0 13354.0 13347.0 13342.0 13341.5 13338.0 13334.0 13333.0 13328.0 13327.5 13324.0 13322.5 13322.0 13318.5 13309.5 13304.5 13299.5 13298.0 13297.5 13294.0 13293.5 13290.5 13289.0 13285.0 13282.5 .......... EQUIVALENT UNSHIFTEDDEPTH .......... GRCH TDTP .............. 88892.5 88894.0 13443.5 13442.0 13441.0 13433.0 13425.5 13407.0 13403.0 13385.5 13372.5 13368.5 13364.0 13361.5 13343.5 13338.5 13335.5 13327.0 13323.0 13321.5 13319.0 13296.5 13294.5 13291.0 13285.0 13450.0 13444.5 13431.0 13403.0 13385.0 13382.0 13377.5 13371.0 13363.5 13351.5 13344.5 13334.0 13327.0 13322.5 13318.5 13310.0 13305.5 13300.5 13298.0 13295.0 13290.5 13282.0 LIS Tape Verification Listing Schlumberger Alaska Computing Center 4-NOV-1998 12:37 PAGE: 13279.0 13276.0 13273.5 13268 5 13259 5 13258 0 13252 0 13249 0 13248 5 13244 0 13235 5 13233 5 13230 0 13228 0 13225 5 13217 0 13216 0 13212 0 13209 0 13205 0 13204 5 13202 0 13199.0 13196.0 13192.5 13191.0 13189.5 13187.5 13184.0 13181.5 13178.5 13176.0 13172.5 13169.0 13168.5 13164.5 13159.5 13157.0 13156.5 13153.0 13144.0 13142.0 13138.0 13134.5 13127.0 13123.5 13121.0 13116.0 13113.5 13107.5 13100.0 13097.5 13095.5 13093.0 13090.5 13275.0 13267.5 13259.0 13247.5 13241.5 13226.0 13217.0 13203.5 13201.5 13198.5 13194.0 13190.5 13187.0 13177.5 13172.0 13168.5 13159.0 13157.5 13154.0 13141.0 13136.0 13129.0 13110.5 13103.5 13099.5 13278.0 13272.0 13259.5 13251.5 13249.0 13242.5 13235.0 13233.0 13227.5 13224.5 13216.5 13210.0 13207.0 13203.5 13191.5 13189.0 13183.5 13180.5 13174.5 13172.0 13169.5 13164.5 13159.0 13158.0 13153.5 13144.5 13138.5 13127.0 13123.5 13118.5 13115.5 13103.5 13101.5 13096.5 LIS Tape Verification Listing Schlumberger Alaska Computing Center 4-NOV-1998 12:37 PAGE: 10 13089.0 13087.0 13085.5 13081.0 13080.5 13078.5 13073.0 13070.5 13069.0 13063.5 13061.0 13058.5 13053.0 13049.5 13045.0 13044.0 13041.0 13040.5 13039.5 13039.0 13036.5 13027.5 13023.5 13023.0 13019.0 13017.0 13010. 5 13007.5 13006.5 13003.0 12999.5 12998.5 12993 0 12990 0 12987 5 12984 0 12983 0 12978 0 12975 0 12973 5 12971 0 12967 0 12966.0 12963.0 12961.0 12957.0 12954.0 12951.0 12938.0 12930.5 12926.5 12922.5 12920.5 12918.0 12913.5 13096.5 13091.5 13084.5 13082.5 13076.5 13074.5 13067.5 13065.5 13049.5 13045.5 13042.0 13039.5 13032.5 13027.0 13023.0 13015.5 13011.5 13008.0 13003.0 12995.5 12993.0 12991.5 12986.5 12981.5 12973.0 12959.0 12944.5 12938.0 12926.5 12918.5 13091.5 13084.0 13074.5 13065. 0 13058.5 13054.5 13048.5 13045.0 13042.0 13039.5 13032.0 13027.0 13021.0 13015.5 13012.5 13005.0 12998.0 12991.5 12981.5 12977.5 12973.0 12970.0 12967.5 12965.0 12958.5 12945.0 12931.5 12927.0 12923.0 LIS Tape Verification Listing Schlumberger Alaska Computing Center 4-NOV-1998 12 ..37 PAGE: 11 12910.5 12916.0 12901.0 12906.5 12900.5 12906.0 12894.5 12900.5 12893.0 12900.0 12891.0 12897.0 12889.5 12895.5 12885.5 12891.5 12885.0 12890.0 12883.0 12888.5 12877.5 12883.0 12874.0 12879.0 12870.5 12875.0 12869.5 12875.0 12867.0 12872.0 12866.0 12872.0 12864.5 12870.0 12863.5 12869.5 12860.0 12865.0 12865.5 12857.0 12862.0 12855.0 12860.0 12853.0 12858.0 12851.0 12856.0 12856.0 12846.0 12850.5 12845.5 12850.5 12841.0 12845.0 12840.0 12845.0 12837.0 12842.5 12836.5 12842.0 100.0 105.5 105.5 $ REMARKS: THIS FILE CONTAINS CASED HOLE TDTP BASE PASS #2. THE DEPTH SHIFTS SHOWN ABOVE REFLECT CORRELATIONS BETWEEN GRCH BASE PASS #2 AND GRCH BASE PASS #1, ALSO SIGMA BASE PASS #2 AND SIGMA BASE PASS #1, CARRYING ALL TDTP CURVES WITH THE SIGMA SHIFTS. $ LIS FORMAT DATA ** DATA FORMAT SPECIFICATION RECORD ** ** SET TYPE- 64EB ** TYPE REPR CODE VALUE 1 66 0 2 66 0 3 73 88 4 66 1 5 66 LIS Tape Verification Listing Schlumberger Alaska Computing Center 4-NOV-1998 12:37 PAGE: 12 TYPE REPR CODE VALUE 6 73 7 65 8 68 0.5 9 65 FT 11 66 11 12 68 13 66 0 14 65 FT 15 66 68 16 66 1 0 66 1 ** SET TYPE - CHAN ** NAME SERV UNIT SERVICE API API API API FILE NUMB NUMB SIZE REPR PROCESS ID ORDER # LOG TYPE CLASS MOD NUMB SAMP ELE~f CODE (HEX) DEPT FT 1171593 O0 000 O0 0 2 1 1 4 68 0000000000 SIGMTDTP CU 1171593 O0 000 O0 0 2 1 1 4 68 0000000000 TPHI TDTP PU-S 1171593 O0 000 O0 0 2 1 1 4 68 0000000000 SBHF TDTP CU 1171593 O0 000 O0 0 2 1 1 4 68 0000000000 SBHiNTDTP CU 1171593 O0 000 O0 0 2 1 1 4 68 0000000000 SIGC TDTP CU 1171593 O0 000 O0 0 2 1 1 4 68 0000000000 SIBHTDTP CU 1171593 O0 000 O0 0 2 1 1 4 68 0000000000 TRAT TDTP 1171593 O0 000 O0 0 2 1 1 4 68 0000000000 SDSI TDTP CU 1171593 O0 000 O0 0 2 1 1 4 68 0000000000 BACK TDTP CPS 1171593 O0 000 O0 0 2 1 1 4 68 0000000000 FBAC TDTP CPS 1171593 O0 000 O0 0 2 1 1 4 68 0000000000 TCAN TDTP CPS 1171593 O0 000 O0 0 2 1 1 4 68 0000000000 TCAF TDTP CPS 1171593 O0 000 O0 0 2 1 1 4 68 0000000000 TCND TDTP CPS 1171593 O0 000 O0 0 2 1 1 4 68 0000000000 TCFD TDTP CPS 1171593 O0 000 O0 0 2 1 1 4 68 0000000000 TSCN TDTP CPS 1171593 O0 000 O0 0 2 1 1 4 68 0000000000 TSCF TDTP CPS 1171593 O0 000 O0 0 2 1 1 4 68 0000000000 INND TDTP CPS 1171593 O0 000 O0 0 2 1 1 4 68 0000000000 INFD TDTP CPS 1171593 O0 000 O0 0 2 1 1 4 68 0000000000 GRCH TDTP GAPI 1171593 O0 000 O0 0 2 1 1 4 68 0000000000 TENS TDTP LB 1171593 O0 000 O0 0 2 1 1 4 68 0000000000 CCL TDTP V 1171593 O0 000 O0 0 2 1 1 4 68 0000000000 ** DATA ** DEPT. 13467.000 SIGM. TDTP 16.051 TPHI.TDTP 34.650 SBHF. TDTP SBHN. TDTP 44.758 SIGC. TDTP 0.927 SIBH. TDTP 92.685 TRAT. TDTP SDSI. TDTP 0.232 BACK. TDTP 87.436 FBAC. TDTP 19.170 TCAN. TDTP TCAF. TDTP 18765.441 TCND. TDTP 26762.496 TCFD. TDTP 8056.993 TSCN. TDTP TSCF. TDTP 3645.080 INND. TDTP 1962.145 INFD. TDTP 296.480 GRCH. TDTP TENS. TDTP 109.000 CCL.TDTP 0.000 34.853 2.161 53213.625 10336.443 -999.250 LIS Tape Verification Listing Schlumberger Alaska Computing Center 4-NOV-1998 12:37 PAGE: 13 DEPT. 12821.500 SIGM. TDTP 18.688 TPHI. TDTP 26.201 SBHF. TDTP 47.101 SBHN. TDTP 61.769 SIGC. TDTP 0.617 SIBH. TDTP 152.344 TRAT. TDTP 1.690 SDSI.TDTP 0.328 BACK. TDTP 170.063 FBAC. TDTP 36.075 TCAN. TDTP 34579.891 TCAF. TDTP 14994.072 TCND. TDTP 21839.293 TCFD. TDTP 7460.486 TSCN. TDTP 6769.624 TSCF. TDTP 2935.354 INND. TDTP 2183.043 INFD. TDTP 261.895 GRCH. TDTP 76.592 TENS.TDTP 109.000 CCL.TDTP 0.000 ** END OF DATA ** **** FILE TRAILER **** FILE NAME : EDIT .002 SERVICE : FLIC VERSION : O01CO1 DATE : 98/11/ 4 MAX REC SIZE : 1024 FILE TYPE : LO LAST FILE : **** FILE HEADER **** FILE NAME : EDIT .003 SERVICE : FLIC VERSION ' O01CO1 DATE ' 98/11/ 4 MAX REC SIZE : 1024 FILE TYPE : LO LAST FILE : FILE HEADER FILE NUM~ER: 3 AVERAGED CURVES Pulsed Neutron: Unaveraged edited Pass 1 Gamma Ray and backround counts; arithmetic average of edited static baseline passes for all other curves. DEPTH INCREMENT O . 5000 PASSES INCLUDED IN AVERAGE LDWG TOOL CODE PASS NUMBERS .......................... 1, 2, TDTP THIS FILE CONTAINS THE ARITHMETIC AVERAGE OF PASSES l& 2. THE DATA WAS CLIPPED AND DEPTH SHIFTED BEFORE THE AVERAGE WAS CALCULATED. $ LIS FORMAT DATA LIS Tape Verification Listing Schlumberger Alaska Computing Center 4-NOV-1998 12:37 PAGE: 14 ** DATA FORMAT SPECIFICATION RECORD ** ** SET TYPE- 64EB ** TYPE REPR CODE VALUE 1 66 0 2 66 0 3 73 80 4 66 1 5 66 6 73 7 65 8 68 0.5 9 65 FT 11 66 12 12 68 13 66 0 14 65 FT 15 66 68 16 66 1 0 66 1 ** SET TYPE - CHAN ** NAME SERV UNIT SERVICE APIAPI API API FILE NUPIB NUMB SIZE REPR PROCESS ID ORDER # LOG TYPE CLASS MOD NUM~ SAMP ELEM CODE (HEX) O0 000 O0 0 3 1 1 4 68 0000000000 DEPT FT 1171593 SIGM PNAV CU 1171593 O0 000 O0 0 3 1 1 4 68 0000000000 TPHI PNAV PU-S 1171593 O0 000 O0 0 3 1 1 4 68 0000000000 SBHF PNAV CU 1171593 O0 000 O0 0 3 1 1 4 68 0000000000 SBHNPNAV CU 1171593 O0 000 O0 0 3 1 1 4 68 0000000000 SIGC PNAV CU 1171593 O0 000 O0 0 3 1 1 4 68 0000000000 SIBH PNAV CU 1171593 O0 000 O0 0 3 1 1 4 68 0000000000 TRAT PNAV 1171593 O0 000 O0 0 3 1 1 4 68 0000000000 SDSI PNAV CU 1171593 O0 000 O0 0 3 1 1 4 68 0000000000 BACK TDTP CPS 1171593 O0 000 O0 0 3 1 1 4 68 0000000000 FBAC TDTP CPS 1171593 O0 000 O0 0 3 1 1 4 68 0000000000 TCANPNAV CPS 1171593 O0 000 O0 0 3 1 1 4 68 0000000000 TCAF PNAV CPS 1171593 O0 000 O0 0 3 1 1 4 68 0000000000 TCND PNAV CPS 1171593 O0 000 O0 0 3 1 1 4 68 0000000000 TCFD PNAV CPS 1171593 O0 000 O0 0 3 1 1 4 68 0000000000 TSCN PNAV CPS 1171593 O0 000 O0 0 3 1 1 4 68 0000000000 TSCF PNAV CPS 1171593 O0 000 O0 0 3 1 1 4 68 0000000000 INND PNAV CPS 1171593 O0 000 O0 0 3 1 1 4 68 0000000000 INFD PNAV CPS 1171593 O0 000 O0 0 3 1 1 4 68 0000000000 GRCH TDTP GAPI 1171593 O0 000 O0 0 3 1 1 4 68 0000000000 LIS Tape Verification Listing Schlumberger Alaska Computing Center 4-NOV-1998 12:37 PAGE: 15 ** DATA ** DEPT. 13467.000 SIGM. PNAV SBHN. PNAV 44.085 SIGC. PNAV SDSI.PNAV 0.226 BACK. TDTP TCAF. PNAV 18945.023 TCND.PNAV TSCF. PNAV 3694.843 INND.PNAV DEPT. 12832.500 SIGM. PNAV SBHN. PNAV -999.250 SIGC. PNAV SDSI.PNAV -999.250 BACK. TDTP TCAF. PNAV -999.250 TClVD.PNAV TSCF. PNAV -999.250 INND.PNAV 16.223 TPHI.PNAV 34.559 SBHF. PNAV 33.010 0.938 SIBH. PNAV 89.027 TRAT. PNAV 2.150 40.644 FBAC. TDTP 11.426 TCAN. PNAV 53331.523 26803.832 TCFD.PNAV 8102.833 TSCN. PNAV 10400.934 2039.763 INFD.PNAV 293.758 GRCH. TDTP -999.250 -999.250 TPHI.PNAV -999.250 SBHF. PNAV -999.250 -999.250 SIBH. PNAV -999.250 TRAT. PNAV -999.250 -999.250 FBAC. TDTP -999.250 TCAN. PNAV -999.250 -999.250 TCFD.PNAV -999.250 TSCN. PNAV -999.250 -999.250 INFD.PNAV -999.250 GRCH. TDTP 332.725 ** END OF DATA ** **** FILE TRAILER **** FILE NAME : 'EDIT .003 SERVICE : FLIC VERSION · O01CO1 DATE : 98/11/ 4 MAX REC SIZE : 1024 FILE TYPE : LO LAST FILE : **** FILE HEADER **** FILE NAME : EDIT .004 SERVICE : FLIC VERSION · O01CO1 DATE : 98/11/ 4 MAX REC SIZE : 1024 FILE TYPE : LO LAST FILE : FILE HEADER FILENUMBER 4 RAW CURVES Curves and log header data for each pass in separate files; raw background pass in last file PASS ~ER: 1 DEPTH INCREFiF2~T: 0.5000 FILE SUM~fARY VENDOR TOOL CODE START DEPTH STOP DEPTH TDTP 13486.0 12782.0 $ LOG HEADER DATA LIS Tape Verification Listing Schlumberger Alaska Computing Center 4-NOV-1998 12:37 PAGE: 16 DATE LOGGED: SOFTWARE VERSION: TIME LOGGER ON BOTTOM: TD DRILLER (FT) : TD LOGGER (FT) : TOP LOG INTERVAL (FT): BOTTOM LOG INTERVAL (FT) : LOGGING SPEED (FPHR) : DEPTH CONTROL USED (YES/NO): 06-MAR-98 8C0-609 1935 06-MAR-98 13531.0 13486.0 12816.0 13461.0 1800.0 TOOL STRING (TOP TO BOTTOM) VENDOR TOOL CODE TOOL TYPE GR GAi~MA RAY TDTP THERMAL DECAY $ TOOL NUMBER ........... CGRS-A TDT-P BOREHOLE AND CASING DATA OPEN HOLE BIT SIZE (IN): DRILLERS CASING DEPTH (FT) : LOGGERS CASING DEPTH (FT) : 3. 750 13531.0 BOREHOLE CONDITIONS FLUID TYPE: FLUID DENSITY (LB/G): SURFACE TEMPERATURE (DEGF) : BOTTOM HOLE TEMPERATZrRE (DEGF) : FLUID SALINITY (PPM) : FLUID LEVEL (FT) : FLUID RATE AT WELLHEAD (BPM) : WATER CUTS (PCT) : GAS~OIL RATIO: CHOKE (DEG) : Seawater 8.40 68.0 205.0 NEUTRON TOOL TOOL TYPE (EPITHERMAL OR THERMAL): MATRIX: MATRIX DENSITY: HOLE CORRECTION (IN): THERMAL SANDSTONE 2.65 BLUELINE COUNT RATE NORMALIZATION IN OIL ZONE TOP NORMALIZING WINDOW (FT): BASE NORMALIZING WINDOW (FT): BLUELINE COUNT RATE SCALES SET BY FIELD ENGINEER FAR COUNT RATE LOW SCALE (CPS): 0 FAR COUNT RATE HIGH SCALE (CPS): 12000 NEAR COUNT RATE LOW SCALE (CPS): 0 NEAR COUNT RATE HIGH SCALE (CPS): 30000 TOOL STANDOFF (IN): TDT run with Dowell Schlumberger Coiled Tubing Unit Correlated to Sperry-Sun gamma ray from NGP-ROP log dated 20-Feb-98. All scales and intervals as requested LIS Tape Verification Listing Schlumberger Alaska Computing Center 4-NOV-1998 12:37 PAGE: 17 TDTrun for gas detection Well filled with sea water Logged interval: 12850 - 13497' measured depth Two passes made at 1800fph as requested No elevation data provided for log - tied into GR for depth control. Main pass logged first then repeat pass. Thank you for using Schlumberger! THIS FILE CONTAINS THE RAW DATA FOR PASS #1. $ LIS FORMAT DATA ** DATA FORMAT SPECIFICATION RECORD ** ** SET TYPE - 64EB ** TYPE REPR CODE VALUE 1 66 0 2 66 0 3 73 88 4 66 1 5 66 6 73 7 65 8 68 0.5 9 65 FT 11 66 11 12 68 13 66 0 14 65 FT 15 66 68 16 66 1 0 66 1 ** SET TYPE - CHAN ** NAME SERVUNIT SERVICE API API API API FILE NIk4~ ~ SIZE REPR PROCESS ID ORDER # LOG TYPE CLASS MOD NUMB SAMP ELEM CODE (HEX) DEPT FT 1171593 O0 000 O0 0 4 1 1 4 68 0000000000 SIGM PS1 CU 1171593 O0 000 O0 0 4 1 1 4 68 0000000000 TPHI PS1 PU 1171593 O0 000 O0 0 4 1 1 4 68 0000000000 SBHF PS1 CU 1171593 O0 000 O0 0 4 1 1 4 68 0000000000 SBHNPS1 CU 1171593 O0 000 O0 0 4 1 1 4 68 0000000000 SIGC PSi CU 1171593 O0 000 O0 0 4 1 1 4 68 0000000000 SIBH PS1 CU 1171593 O0 000 O0 0 4 1 1 4 68 0000000000 TRAT PS1 1171593 O0 000 O0 0 4 1 1 4 68 0000000000 SDSI PS1 CU 1171593 O0 000 O0 0 4 1 1 4 68 0000000000 BACK PS1 CPS 1171593 O0 000 O0 0 4 1 1 4 68 0000000000 LIS Tape Verification Listing Schlumberger Alaska Computing Center 4-NOV-1998 12:37 PAGE: 18 NAME SERV UNIT SERVICE API API API API FILE NUM~ NUMB SIZE REPR PROCESS ID ORDER # LOG TYPE CLASS MOD NUFIB SAMP ELEM CODE (HEX) FBAC PS1 CPS 1171593 O0 000 O0 0 4 1 1 4 TCANPS1 CPS 1171593 O0 000 O0 0 4 1 1 4 TCAFPS1 CPS 1171593 O0 000 O0 0 4 1 1 4 TCND PS1 CPS 1171593 O0 000 O0 0 4 1 1 4 TCFD PS1 CPS 1171593 O0 000 O0 0 4 1 1 4 TSCN PS1 CPS 1171593 O0 000 O0 0 4 1 1 4 TSCF PS1 CPS 1171593 O0 000 O0 0 4 1 1 4 INND PS1 CPS 1171593 O0 000 O0 0 4 1 1 4 INFD PS1 CPS 1171593 O0 000 O0 0 4 1 1 4 TENS PS1 LB 1171593 O0 000 O0 0 4 1 1 4 GR PS1 GAPI 1171593 O0 000 O0 0 4 1 1 4 CCL PS1 V 1171593 O0 000 O0 0 4 1 1 4 68 0000000000 68 0000000000 68 0000000000 68 0000000000 68 0000000000 68 0000000000 68 0000000000 68 0000000000 68 0000000000 68 0000000000 68 0000000000 68 0000000000 ** DATA ** DEPT. 13480 000 SIGM. PS1 13.218 TPHI.PS1 SBHN. PS1 39 825 SIGC.PS1 1.336 SIBH. PS1 SDSI.PS1 0 233 BACK.PSI 77.023 FBAC. PS1 TCAF. PS1 32154 270 TCND.PS1 30783.703 TCFD.PS1 TSCF. PS1 4504 739 INND.PS1 2168.023 INFD. PS1 GR.PS1 52 647 CCL.PS1 0.000 DEPT. SBPiN. PS1 SDSI.PS1 TCAF.PS1 TSCF. PS1 GR.PS1 12800.000 SIGM. PS1 30.305 TPHI.PS1 58.932 SIGC.PS1 0.016 SIBH. PS1 0.378 BACK. PSi 148.089 FBAC. PS1 9880.369 TCND.PS1 19492.805 TCFD. PS1 1391.674 INND.PS1 2154.220 INFD.PS1 108.443 CCL.PS1 0.000 30.849 SBHF. PS1 10.634 67.475 TRAT. PS1 2.153 10.217 TCAN. PS1 88271.219 9266.445 TSCN. PS1 12366.596 449.770 TENS.PSi 109.000 50.956 SBHF. PS1 42.482 164.576 TRAT. PS1 1.900 68.505 TCAN. PS1 30893.652 5384.277 TSCN. PS1 4281.603 277.400 TENS.PSI 109.000 ** END OF DATA ** **** FILE TRAILER **** FILE NAM~ : EDIT .004 SERVICE : FLIC VERSION : O01CO1 DATE : 98/11/ 4 MAX REC SIZE : 1024 FILE TYPE : LO LAST FILE : LIS Tape Verification Listing Schlumberger Alaska Computing Center 4-NOV-1998 12:37 PAGE: 19 **** FILE HEADER **** FILE NAFIE : EDIT .005 SERVICE : FLIC VERSION : O01CO1 DATE : 98/11/ 4 MAX REC SIZE : 1024 FILE TYPE : LO LAST FILE : FILE HEADER FILE NUFiBER 5 RAW CURVES Curves and log header data for each pass in separate files; raw background pass in last file PASS NUMBER: 2 DEPTH INCREMENT: 0.5000 FILE SUF~W3h~Y VEaVDOR TOOL CODE START DEPTH STOP DEPTH 13486.0 12770.0 TDTP $ LOG HEADER DATA DATE LOGGED: 06-MAR-98 SOFTWARE VERSION: 8C0-609 TIME LOGGER ON BOTTOM: 1935 06-MAR-98 TD DRILLER (FT) : 13531.0 TD LOGGER (FT) : 13486.0 TOP LOG INTERVAL (FT) : 12816.0 BOTTOM LOG INTERVAL (FT) : 13461.0 LOGGING SPEED (FPHR) : 1800.0 DEPTH CONTROL USED (YES/NO): TOOL STRING (TOP TO BOTTOM) VEaVDOR TOOL CODE TOOL TYPE GR GABmLA RAY TDTP THERMAL DECAY $ BOREHOLE AND CASING DATA OPEN HOLE BIT SIZE (IN): DRILLERS CASING DEPTH (FT): LOGGERS CASING DEPTH (FT): BOREHOLE CONDITIONS FLUID TYPE: FLUID DENSITY (LB/G): SURFACE TEMPERATURE (DEGF) : BOTTOM HOLE TEMPERATURE (DEGF) : FLUID SALINITY (PPM) : FLUID LEVEL (FT) : TOOL NUMBER CGRS-A TDT- P 3. 750 13531.0 Seawater 8.40 68.0 205.0 LIS Tape Verification Listing Schlumberger Alaska Computing Center 4-NOV-1998 12:37 PAGE: 2O FLUID RATE AT WELLHEAD (BPM) : WATER CUTS (PCT) : GAS~OIL RATIO: CHOKE (DEG) : NEUTRON TOOL TOOL TYPE (EPITHERMAL OR THERMAL): MATRIX: MATRIX DENSITY: HOLE CORRECTION (IN): THERMAL SANDSTONE 2.65 BLUELINE COUNT RATE NORMALIZATION IN OIL ZONE TOP NORMALIZING WINDOW (FT) : BASE NORMALIZING WINDOW (FT) : BLUELINE COUNT RATE SCALES SET BY FIELD ENGINEER FAR COUNT RATE LOW SCALE (CPS): 0 FAR COUNT RATE HIGH SCALE (CPS): 12000 NEAR COUNT RATE LOW SCALE (CPS): 0 NEJL~ COUNT RATE HIGH SCALE (CPS): 30000 TOOL STANDOFF (IN): REMARKS: TDT run with Dowell Schlumberger Coiled Tubing Unit Correlated to Sperry-Sun gamma ray from NGP-ROP log dated 20-Feb-98. All scales and intervals as requested TDT run for gas detection Well filled with sea water Logged interval: 12850 - 13497' measured depth Two passes made at 1800fph as requested No elevation data provided for log - tied into GR for depth control. Main pass logged first then repeat pass. Thank you for using Schlumberger! THIS FILE CONTAINS THE RAW DATA FOR PASS #2. $ LIS FORMAT DATA ** DATA FORMAT SPECIFICATION RECORD ** ** SET TYPE - 64EB ** TYPE REPR CODE VALUE 1 66 0 2 66 0 3 73 88 4 66 1 5 66 6 73 7 65 LIS Tape Verification Listing Schlumberger Alaska Computing Center 4-NOV-1998 12:37 PAGE: 21 TYPE REPR CODE VALUE 8 ' 68 O. 5 9 65 FT 11 66 11 12 68 13 66 0 14 65 FT 15 66 68 16 66 1 0 66 1 ** SET TYPE - CHAN ** NAME SERVUNIT SERVICE API API API API FILE NUFiB NUMB SIZE REPR PROCESS ID ORDER # LOG TYPE CLASS MOD NUM~ SAMP ELEM CODE (HEX) DEPT FT 1171593 O0 000 O0 0 5 1 1 4 68 0000000000 SIGM PS2 CU 1171593 O0 000 O0 0 5 1 1 4 68 0000000000 TPHI PS2 PU 1171593 O0 000 O0 0 5 1 1 4 68 0000000000 SBHF PS2 CU 1171593 O0 000 O0 0 5 1 1 4 68 0000000000 SBHNPS2 CU 1171593 O0 000 O0 0 5 1 1 4 68 0000000000 SIGC PS2 CU 1171593 O0 000 O0 0 5 1 1 4 68 0000000000 SIBH PS2 CU 1171593 O0 000 O0 0 5 1 1 4 68 0000000000 TRAT PS2 1171593 O0 000 O0 0 5 1 1 4 68 0000000000 SDSI PS2 CU 1171593 O0 000 O0 0 5 1 1 4 68 0000000000 BACK PS2 CPS 1171593 O0 000 O0 0 5 1 1 4 68 0000000000 FBAC PS2 CPS 1171593 O0 000 O0 0 5 1 1 4 68 0000000000 TCANPS2 CPS 1171593 O0 000 O0 0 5 1 1 4 68 0000000000 TCAFPS2 CPS 1171593 O0 000 O0 0 5 1 1 4 68 0000000000 TCND PS2 CPS 1171593 O0 000 O0 0 5 1 1 4 68 0000000000 TCFD PS2 CPS 1171593 O0 000 O0 0 5 1 1 4 68 0000000000 TSCN PS2 CPS 1171593 O0 000 O0 0 5 1 1 4 68 0000000000 TSCF PS2 CPS 1171593 O0 000 O0 0 5 1 1 4 68 0000000000 INND PS2 CPS 1171593 O0 000 O0 0 5 1 1 4 68 0000000000 INFD PS2 CPS 1171593 O0 000 O0 0 5 1 1 4 68 0000000000 TENS PS2 LB 1171593 O0 000 O0 0 5 1 1 4 68 0000000000 GR PS2 GAPI 1171593 O0 000 O0 0 5 1 1 4 68 0000000000 CCL PS2 V 1171593 O0 000 O0 0 5 1 1 4 68 0000000000 ** DATA ** DEPT. 13480.000 SIGM. PS2 15.570 TPHI.PS2 37.630 SBHF. PS2 SBHN. PS2 51.799 SIGC. PS2 0.697 SIBH. PS2 129.333 TRAT. PS2 SDSI.PS2 0.276 BACK. PS2 118.048 FBAC.PS2 25.302 TCAN. PS2 TCAF. PS2 21989.805 TCND. PS2 31102.824 TCFD. PS2 9203.008 TSCN. PS2 TSCF. PS2 4464.042 INND. PS2 2658.411 INFD.PS2 337.584 TENS.PS2 GR.PS2 0.000 CCL.PS2 0.000 60.600 2.249 63237.523 12837.539 109.000 LIS Tape Verification Listing Schlumberger Alaska Computing Center 4-NOV-1998 12:37 PAGE: 22 ** END OF DATA ** **** FILE TRAILER **** FILE NA~E : EDIT °005 SERVICE : FLIC VERSION : O01CO1 DATE : 98/11/ 4 MAX REC SIZE : 1024 FILE TYPE : LO LAST FILE : **** TAPE TRAILER **** SERVICE NAME : EDIT DATE : 98/11/ 4 ORIGIN : FLIC TAPE NAME : 98359 CONTINUATION # : 1 PREVIOUS TAPE : COfV~zEal~ : ARCO ALASKA INC, D.S. 3-24A, PRUDHOE BAY, 50-029-21015-01 **** REEL TRAILER **** SERVICE NAME : EDIT DATE : 98/11/ 4 ORIGIN : FLIC REEL NAME : 98359 CONTINUATION # : PREVIOUS REEL : COPk~ENT : ARCO ALASKA INC, D.S. 3-24A, PRUDHOE BAY, 50-029-21015-01