WELL COMPLETION OR RECOMPLETION REPORT AND LOG
Alaska Oil & Gas Cons. Commission
REeEI·VE!C
NOV 3 Ô Z005
.. .
1a. Well Status: D Oil DGas D Plugged 181 Abandoned D Suspended DWAG 1 b. Well Class:
20AAC 25.105 20AAC 25.110 181 Development D Exploratory
DGINJ DWINJ D WDSPL No. of Completions Zero Other D Stratigraphic D Service
2. Operator Name: 5. Date Comp., Susp., or Aband. 12. Permit to Drill Number
BP Exploration (Alaska) Inc. 10/20/2005 197-224 305-277
3. Address: 6. Date Spudded 13. API Number
P.O. Box 196612, Anchorage, Alaska 99519-6612 12/09/1997 50- 029-22166-01-00
4a. Location of Well (Governmental Section): 7. Date T.D. Reached 14. Well Name and Number:
Surface: 12/16/1997 PBU P-06A
2506' FSL, 1963' FWL, SEC. 31, T11N, R13E, UM 8. KB Elevation (ft): 15. Field / Pool(s):
Top of Productive Horizon:
295' FSL, 1925' FWL, SEC. 30, T11 N, R13E, UM 92.11 Prudhoe Bay Field / Prudhoe Bay
Pool
Total Depth: 9. Plug Back Depth (MD+ TVD)
1901' FSL, 1794' FWL, SEC. 30, T11N, R13E, UM 12063 + 9090 Ft
4b. Location of Well (State Base Plane Coordinates): 10. Total Depth (MD+ TVD) 16. Property Designation:
Surface: x- 631246 y- 5947233 Zone- ASP4 12130 + 9120 Ft 028288
TPI: x- 631156 y- 5950301 Zone- ASP4 11. Depth where SSSV set 17. Land Use Permit:
Total Depth: x- 630997 y- 5951904 Zone- ASP4 N/A MD
-- - -- - 19. Water depth, if offshore 20. Thickness of Permafrost
18. Directional Survey DYes 181 No N/ A MSL 1900' (Approx.)
21. Logs Run:
GR
2. CASING, LINER AND CEMENTING RECORD
CASING ·1SETT1NG· UEPTliMD ISETTING L ePTH'TVD H()LIa ".
SIZE Wt.PER FT; GRADE TOP BOTTOM TOP BOTTOM SIZE / t"UL.l.ED ..
20" Surface 120' Surface 120'
10-314" 45.5# N-80 Surface 2687' Surface 2687' 13-1/2" 2939 cu ft Permafrost
7-5/8" 29.7# NT95HS Surface 9967' Surface 8893' 9-5/8" 1461 cu ft Class 'G'
5-1/2" 17# NT13CrBO 9739' 10039' 8728' 8947' 6-3/4" 165 cu ft Class 'G'
2-7/8" 6.16# L-80 9998' 12130' 8916' 9120' 3-3/4" 109 cu ft Class 'G'
23. Perforations open to Production (MD + TVD of Top and 24. /'i ;'f JBlNG ....... ....... /i.
Bottom Interval, Size and Number; if none, state "none"): SIZE DEPTH SET (MD) PACKER SET (MD)
None 4-1/2", 12.6#, 13Cr80 9743' 9677'
MD TVD MD TVD
25: ~Þ. a::+" ./
./
DEPTH INTERVAL (MD) AMOUNT & KIND OF MATERIAL USED
~(;A.NNElJ '1; (~ 2no~ 10025' Set CIBP
L J¡J ',j; 9976' Set Whipstock
9976' P&A w/ 15.3 Bbls Class 'G'
26. PRODUCTION TEST
Date First Production: Method of Operation (Flowing, Gas Lift, etc.):
Not on Production N/A
Date of Test Hours Tested PRODUCTION FOR Oll-BBl GAs-McF WATER-BBl CHOKE SIZE I GAS-Oil RATIO
TEST PERIOD ...
Flow Tubing Casing Pressure CALCULATED + Oll-BBl GAs-McF WATER-BBl Oil GRAVITY-API (CORR)
Press. 24-HoUR RATE
27. CORE DATA
Brief description of lithology, porosity, fractures, apparent dips and presence of oil, gas or water (attach separate sheet, if necessary).
Submit core chips; if none, state "none". RBDMS 8Fl DEC 0 ;} 7005
Form 1 0-407 Revised 12/2003 tJ h) I (~ i~Þ. UED ON REVERSE SIDE
utft
28.
.1A
GEOLOGIC MARKER~ ~
29.
FORMATION TESTS
NAME
MD
TVD
Include and briefly summarize test results. List intervals tested,
and attach detailed supporting data as necessary. If no tests
were conducted, state 'None".
Shublik D
10073'
8971'
Eileen
10076'
8974'
Sadlerochit
10083'
8978'
30. List of Attachments: Summary of Pre-Rig Work and Daily Drilling Reports
31. I hereby certify that the foregoing is true and correct to the best of my knowledge.
Signed
Terrie Hubble
PBU P-06A
Well Number
Title
Technical Assistant
Date
\l/éÁ-9!t
197-224 305-277
Permit No. / A roval No.
INSTRUCTIONS
GENERAL: This form is designed for submitting a complete and correct well completion report and log on all types of lands and leases in
Alaska.
Prepared By NamelNumber:
Drilling Engineer:
Terrie Hubble, 564-4628
Ted Stagg, 564-4694
ITEM 1a: Classification of Service Wells: Gas Injection, Water Injection, Water-Alternating-Gas Injection, Salt Water Disposal, Water
Supply for Injection, Observation, or Other. Multiple completion is defined as a well producing from more than one pool with
production from each pool completely segregated. Each segregated pool is a completion.
ITEM 4b: TPI (Top of Producing Interval).
ITEM 8: The Kelly Bushing elevation in feet above mean low low water. Use same as reference for depth measurements given in other
spaces on this form and in any attachments.
ITEM 13: The API number reported to AOGCC must be 14 digits (ex: 50-029-20123-00-00).
ITEM 20: True vertical thickness.
ITEM 22: Attached supplemental records for this well should show the details of any multiple stage cementing and the location of the
cementing tool.
ITEM 23: If this well is completed for separate production from more than one interval (multiple completion), so state in item 1, and in
item 23 show the producing intervals for only the interval reported in item 26. (Submit a separate form for each additional
interval to be separately produced, showing the data pertinent to such interval).
ITEM 26: Method of Operation: Flowing, Gas Lift, Rod Pump, Hydraulic Pump, Submersible, Water Injection, Gas Injection, Shut-In, or
Other (explain).
ITEM 27: If no cores taken, indicate 'None".
ITEM 29: List all test information. If none, state "None".
Form 1 0-407 Revised 12/2003
Submit Original Only
Well:
Field:
API:
Permit:
e
e
P-06B
Prudhoe Bay Unit
50-029-22166-02-00
205-138
Accept:
Spud:
Release:
Rig:
1 0/20/05
1 0/22/05
1 0/28/05
Nordic #1
PRE-RIG WORK
10/08/05
SET CAST IRON PLUG AT 10025. RUN JEWELRY LOG, CCL TO MID ELEMENT: 11.3', CCL STOP DEPTH:
10013.7'. GLM #3 FOUND AT 7769' NOT 7729'.
10/09/05
LOG LEAK DETECTION FROM SURFACE TO TD. TOOL FAILED ON STATIC PASS. UNABLE TO COMPLETE
JOB. POOH AND TURNED WELL OVER TO DSO.
1 0/12/05
LEAK DETECT LOG. STOP COUNTS INDICATE PLUG SET AT 10025' IS LEAKING. NO OTHER ANOMALIES
DETECTED. CALIPER READINGS INDICATE 2 7/8" LINER IS LARGER. TAGGED TD AT 10025'.
1 0/13/05
SET TOP OF WHIPSTOCK AT 9974'. ORIENTATION 13.7 DEG LEFT OF HIGH SIDE.
e
BP, EXPLORATION Page 1_
Operations Sl.ImmäryReport
Legal Well Name: P-06
Common Well Name: P-06 Spud Date: 5/6/1991
Event Name: REENTER+COMPLETE Start: 10/18/2005 End: 10/28/2005
Contractor Name: NORDIC CALISTA Rig Release: 10/28/2005
Rig Name: NORDIC 1 Rig Number: N1
Date From - To Hours Task Code NPT Phase Description of Operations
10/18/2005 14:00 - 16:30 2.50 RIGD P PRE Rig released from W-39A @ 14:00Hrs on 10/18/2005. Unstab
CT. Remove & R/D gooseneck & packoff. Prep to move rig to
P-pad.
116:30 - 16:45 0.25 MOB P PRE PJSM for moving rig off well.
16:45 - 17:00 0.25 MOB P PRE Jack-up rig & pull rig off well. Conduct post-operations pad
inspection.
17:00 - 18:30 1.50 MOB N RREP PRE Prepare rig for tire change out. Remove stairs & landing.
18:30 - 18:45 0.25 MOB N RREP PRE PJSM for changing out tire.
118:45 - 00:00 5.25 MOB N RREP PRE Change out off-driller's side rear inside tire. Meanwhile
changeout injector chains.
10/19/2005 00:00 - 01 :30 I 1.50 MOB N RREP PRE Finish changing out tire. Install stairs & landing.
101 :30 - 01 :45 0.25 MOB P PRE Held pre-move safety meeting with crew, security & tool
services.
101:45 - 14:00 12.25 MOB P PRE Move rig from W-pad to P-pad.
14:00 - 15:00 1.00 MOB P PRE Arrive @ P-pad. Discuss surface close proximity of P-27 with
ANC. P-27's well house was removed for rig access on P-06.
I Depressurize P-27 AL line to header pressure (300psi). P-27 is
a Cat-2 well with no SSSV. There are no annular
communication problems & the tree has been bled down to LP.
Attempt to bled off 50psi WHP on P-06 - no success. Call out
LRS for load & kill.
15:00 - 19:30 4.50 RIGU P PRE PJSM. Install gooseneck & pack-offs. Stab CT. RU & cut 500'
of CT for fatigue managment. Also changing out washed out
HCR control valve on koomey.
Meanwhile W.O. Little Red Pumping Services to arrive onsite.
19:30 - 22:00 2.50 RIGU P PRE Little Red Pumping Services arrive pad. Conduct PJSM for
P-06A well kill. MIRU pumping equipment & hardline on P-06.
Open up well & observe 50psi WHP, Opsi lAP & Opsi OAP.
load/kill well by bullheading 5bbls of MeOH spacer ahead,
290bbls seawater & 5bbls MeOH spacer behind at max rate.
Observe max injectivity of 5bpm @ 2900psi. WHP dropped to
50psi after pump SID. Bled down WHP toOpsi.
Meanwhile P/U BOP stack & install X/O flange. Continue
changing out washed out HCR control valve on koomey.
22:00 - 00:00 2.00 RIGU N SFAL PRE Continue changing out washed out HCR control valve on
koomey. Need koomey to operate the front boosters.
10/20/2005 00:00 - 00:45 0.75 RIGU N SFAL PRE Finish changing out washed out HCR control valve on koomey.
PT valve OK.
00:45 - 01 :00 0.25 MOB P PRE PJSM. Review procedure, hazards & mitigation for backing rig
over well.
01:00 - 01 :30 0.50 MOB P PRE Back rig over well & set down. Accept rig @ 01 :30Hrs on
10/20/2005.
01 :30 - 03:30 2.00 RIGU P PRE N/U BOPE. Grease tree & choke manifold valves. Meanwhile
Pad operator put P-27 back on production.
03:30 - 10:30 7.00 BOPSUF P PRE Perform initial BOPE pressure/function test witnessed by
AOGCC Inspector John Crisp. Meanwhile fill rig pits with 1 %
KCL-water. R/U hardline to tiger tank & Pltest to 4000psi.
10:30 - 12:45 2.25 BOPSUF P PRE Dart coil: 56.4 bbl coil volume.
Pressure/pull test CTC.
Pressure test inner reel valve.
12:45 - 13:00 0.25 ZONISO P WEXIT PU cmt. BHA
Printed: 10/31/2005 11 :40:18 AM
Legal Well Name:
Common Well Name:
Event Name:
Contractor Name:
Rig Name:
e
Page 2 _
BP EXPLORATION
Operations Summary Report
P-06
P-06
REENTER+COMPLETE
NORDIC CALISTA
NORDIC 1
Start:
Rig Release:
Rig Number:
Spud Date: 5/6/1991
End: 10/28/2005
10/18/2005
10/28/2005
N1
Date From - To Hours Task Code NPT Phase
10/20/2005 13:00 - 15:15 2.25 ZONISO P WEXIT
I I
15:15 - 16:45 1.50 ZONISO N DPRB WEXIT
16:45 - 19:00 2.25 ZONISO N DPRB WEXIT
19:00 - 21:15 2.25 ZONISO N DPRB WEXIT
21:15 - 21:45 0.50 ZONISO P WEXIT
21 :45 - 22:30 0.75 ZONISO P WEXIT
22:30 - 22:45 0.25 ZONISO P WEXIT
22:45 - 00:00 1.25 ZONISO P WEXIT
Description of Operations
RIH to 9746'.
Tag, hook load dropped.
Tagged multiple at different speeds and pump rates.
Couldn't work past obstruction.
POOH for stiffer BHA.
POOH for stiffer BHA.
LD BHA #1.
PU BHA #2.
RIH with cmt nozzle BHA #2. Wt check @ 9600': Up - 42.5k,
Down - 26.5k. RIH into 5-1/2' Tbg to 9800'
PUH 3x to 9700' (into 4-1/2' Tbg) & RBIH to 9800' to ensure no
restrictions.
Continue RIH & tag WS 2x @ 9996'. Correct CTD to 9974'
(ELMD). PUH 10' to 9964' & flag CT. Meanwhile RU triplex
pump to IA & bump up lAP to 500psi. RU SLB Cementers.
PJSM with all personnel concerning cementing operations.
Meanwhile continue circulating well bore @ 0.94/0.66bpm &
143psi to liquid pack well bore.
Prime up. Flush/PT lines to 4k. Mix & pump 15.3bbls 15.8 ppg
class 'G' cmt slurry & 5bbls of water behind @ 2.85/2.40bpm &
1500psi. Chase with KCL water @ 2.6212.27bpm & 1750psi.
With cmt 1 bbl from nozzle. Shut-in choke. Bullhead 7.5bbls of
cmt away @ 1.25bpm from 20psi to squeeze pressure of
1000psi. Open up choke. Lay-in remaining 7.8bbls cmt 1:1 to
TOC @ 9588'.
POOH to safety @ 9000'. Shut-in choke.
Hesitate squeeze 5x from 500psi to 1000psi final squeeze
pressure. Squeeze in additional 5.1 bbls of cmt.
Hold final squeeze pressure of 1000psi while circ down
bio-KCL fluid to the nozzle @ 1.6/1.6bpm & 1700psi.
RBIH contaminating cmt to 9964ft with 3.25bpm/1550psi. Make
3 down & 2 up passes.
Jet OOH chasing contamintaed cmt. Jet thoroughly across
jewelries & GLMs.
OOH. PJSM. SIB injector. UD cement nozzle BHA. M/U
swizzle stick & stab injector on well. SI master valve.
Jet BOP stack & surface lines @ max rate.
PIU injector & changeout packoff. Cut CT & install BakerCTC.
Pull test to 35k & pressure test to 3500psi.
M/U window milling BHA #3 with a 3.80· HC DP0261 DWM,
3.80" diamond string reamer, Baker straight Xtreme motor,
MHA & 2 jts of PH6 tbg (OAL - 81.35'). MIU injector.
RIH to pinch pt.
Reciprocate over tubing tail. No problems.
Tag at 9982.9'.
Correct to ELM 9974'.
Flag pipe at 9974' bit depth-closest flag to gooseneck.
WEXIT Mill 3.80· window in 13CR 5.5' tubing.
Pressure off btm: 2000 psi
Q in/out: 2.5-2.7/2.5-2.7.
WOB: 1K Ib - 3K lb.
7/8 ftIhr.
Exit into formation @ 9982'.
10/21/2005 00:00 - 00:10 0.17 ZONISO P WEXIT
00: 1 0 - 00:25 0.25 ZONISO P WEXIT
00:25 - 01 :00 0.58 ZONISO P WEXIT
01 :00 - 01 :45 0.75 ZONISO P WEXIT
01:45-04:10 2.42 ZONISO P WEXIT
04:10 - 04:30 0.33 ZONISO P WEXIT
04:30 - 05:00 0.50 ZONISO P WEXIT
05:00 . 05:30 0.50 STWHIP P WEXIT
05:30 - 06:00 0.50 STWHIP P WEXIT
06:00 - 08:30 2.50 STWHIP P WEXIT
08:30 - 18:00
9.50 STWHIP P
Printed: 10131/2005 11:40:18AM
I ,
e
BP EXPLORATION
Operations Summary Report
Page 3 ...
Legal Well Name:
Common Well Name:
Event Name:
Contractor Name:
Rig Name:
P-06
P-06
REENTER+COMPLETE
NORDIC CALISTA
NORDIC 1
Start:
Rig Release:
Rig Number:
10/18/2005
10/28/2005
N1
Spud Date: 5/6/1991
End: 10/28/2005
Date From- To Hours Task Code NPT Phase Description of Operations
10/21/2005 18:00 - 19:00 1.00 STWHIP P WEXIT Mill 10' formation to 9992' with 2.5/2.5bpm, 1850/1950psi, 6fph
ave ROP & 2k WOB.
19:00 - 19:45 0.75 STWHIP P WEXIT Backream/dress window/rat hole 3x & drift 2x. Window looks
clean. Tentative window depths are: TOWS/TOW = 9974',
BOW = 9982'.
19:45 - 20:30 0.75 STWHIP P WEXIT Swap well bore to reconditioned (65% used/35% new) 8.6 ppg
Flo-Pro mud with 3% L-T & 14ppb K-G.
20:30 - 22:30 2.00 STWHIP P WEXIT Paint EOP flag @ 9800' & POOH window milling BHA #3,
while displacing well to mud.
22:30 - 23:30 1.00 STWHIP P WEXIT PJSM. UD BHA #3 & inspect mills. Window mill & string mill
! gauge 3.80' go / 3.79' no-go. Wear on window mill face
i indicated center crossed the liner wall.
I
23:30 - 23:45 0.25 STWHIP P WEXIT I Held PJSM for cutting CT.
23:45 - 00:00 0.25 STWHIP P WEXIT I R/U hydraulic cutter & cut 150' of CT for chrome- Tbg
management. Have 14930' of CT left on the reel.
10/22/2005 00:00 - 00:30 0.50 DRILL P PROD1 I Rehead & M/U SLB CTC. Pull test to 35k & pressure test to
3500psi - OK.
00:30 - 00:45 0.25 DRILL P PROD1 I Held pre-spud safety meeting. Reviewed well plan, potential
00:45 - 03:00 2.25 DRILL P PROD1 I hazards & drilling BHA M/U procedures.
i MIU drilling BHA #4 with 1.2deg X-treme motor,
MWD/GR-RES, orienter & new Hughes 3-3/4' x 4-1/8"
RWD2ST bicenter bit #2. Scribe tools. Initialize RES tool & M/U
injector.
03:00 - 05:20 2.33 DRILL P PROD1 I RIH drilling BHA#4. SHT MWD & orienter - OK. Continue RIH
to 9800'. PUH to 9700' (into 4-1/2" Tbg) & RBIH to 9850' to
ensure no restrictions.
05:20 - 05:45 0.42 DRILL P PROD1 Orient TF to LOHS & RIH clean thru window with pumps down.
Tag btm with pumps on @ 9993'. Correct CTD to 9992'.
05:45 - 06:00 0.25 DRill P Orient TF to HS.
06:00 - 10:00 4. 0 DRILL P Dril 92- o 2.
PU wt: 39K lb. ,SO wt: 22.5K lb., On btm: 23K lb.
Q: 2.7/2.7 bpm
Pressure off/on btm: 3300 psi/3350 psi.
Correct +2' based on GR tie-in.
10:00-18:10 8.17 DRILL P PROD1 Drill f/10032 - 10100'.
PU wt: , SO wt: , On btm: 20
Q: 2..65-2.75/2.65-2.7
Pressure off/on b . 3150-3250 psi/3300-3500 psi.
Tough drilli . Motor stalls at >200 psi differential.
TF: 0-
18:10 - 18:15 0.08 DRILL P rt wiper to restart MWD tool. Up wt = 37k. Run-in wt = 27k,
lAP = 250psi & OAP = 220psi. PVT = 315bbls.
18:15 - 20:50 2.58 DRILL P Drill to 10150' with 20L-30L TF, 2.57/2.57bpm, 3150/3450psi,
3k WOB & 20fph ave ROP. Seems to have drilled out of the
Shublik.
20:50 - 21 :35 0.75 PROD1 Drill to 10189' with 40L-50L TF, 2.57/2.57bpm, 3150/3450psi,
3k WOB & 50fph ave ROP.
P PROD1 Wiper trip clean to the window. RBIH to btm.
P PROD1 Orient TF around to 70L.
P PROD1 Drill to 10233' with 60-80L TF, 2.57/2.57bpm, 3150/3450psi, 4k
WOB & 30fph ave ROP.
2.33 DRILL P PROD1 Drill to 10315' with 60-80L TF, 2.55/2.55bpm, 3150/3450psi, 4k
WOB & 30fph ave ROP.
Printed: 10/3112005 11:40:18 AM
11/28/05
Schlumberger
;r-'"' "-'\." r,·, n 1 ~ r''',
~~·-l....}Ci '\~ ~iJ
..~.'~.,"':: -..,,<, ~
~1/~
,(1." 1
t~'f
NO. 3613
Alaska Data & Consulting Services
2525 Gambell Street, Suite 400
Anchorage, AK 99503-2838
ATTN: Beth
Company:
State of Alaska
Alaska Oil & Gas Cons Comm
Attn: Helen Warman
333 West 7th Ave, Suite 100
Anchorage, AK 99501
, ,
'2 ~; 2005
.'..
-.....
(0:'.(1., CQmm¡~t\(¡f!
;}Jjfj'¡t)íS£i3
Field: Prudhoe Bay, Milne pt.
Well Job # Loa DescriDtion Date BL Color CD
PSI-07 40009685 OH LDWG EDIT OF MWD/LWD 10112/03 1
PSI-07 40009685 MD VISION DENSITY 10/12/03 1
PSI-07 40009685 TVD VISION DENSITY 10/12/03 1
PSI-07 40009685 MD VISION DEN/NEUTRON 10112/03 1
PSI-07 40009685 TVD VISION DEN/NEUTRON 10/12/03 1
PSI-07 40009685 MD VISION SERVICE 10/12/03 1
PSI-07 40009685 TVD VISION SERVICE 10/12/03 1
Z-02A 11132059 USIT 10/06/05 1
S-14A 10987547 USIT 09/13/05 1
Y-1OA 10889216 SCMT 02/21/05 1
D.S. 03-33A 10893093 SCMT 03/05/05 1
C-19B 10928633 SCMT 05/15/05 1
09-20 10889215 SCMT 02/18/05 1
D.S.09-31C NIA SCMT 11/05/05 1
P-06A 11076455 SCIIIIT Iq Î- ó2..:24.- 07129/05 1
2-22A 11084275 SCMT' 07/10/05 1
K-20B 11075899 SCMT 07104/05 1
D.S. 06-20 11062630 USIT 06/14/05 1
C-18A 10621788 SCMT 06/06/04 1
P1-07A 10621778 SCMT 04/21/04 1
BP Exploration (Alaska) Inc.
Petrotechnical Data Center LR2-1
900 E. Benson Blvd.
Anchorage, Alaska 99508
Alaska Data & Consulting Services
2525 Gambell Street, Suite 400
Anchorage, AK 99503-2838
;:,:::t~)(j
~
Date Delivered:
-11 1~~@5"
I
,
I
Schlumberger
Alaska Data & Consulting Services
2525 Gambell Street. Suite 400
Anchorage. AK 99503-2838
ATTN: Beth
Well
MPC-41
MPG-05
MPL-33
P-06A
DS 02-25
U.:S. 09-10
B-20
Y-25
PSI-10
P-26
02-14A
F-12
04-35
~ 5-09A
15-09A
5-09A
. J-13
D.S. 09-29
BP Exploration (Alaska) Inc.
Petrotechnical Data Center LR2-1
900 E. Benson Blvd.
Anchorage, Alaska 99508
Date Delivered:
Job#
10889195
10715440
11058514
11132061
10987525
11058237
10980591
10928605
10715447
10928634
11075901
NA
10889172
10889183
NA
10919942
10877750
10980596
$(;ANNE[) OCT 3 1 2005
Log Description
SBH SURVEY
MPSP INJECTION PROFILE
INJECTION PROFILE
LDL
INJECTION PROFILE
INJECTION PROFILE ~"'-~\~~ ~
LDL
MEM PPROF W/DEFT
MPSP IPROF & WARMABACK
MEM PPROF W/DEFT
MEM PPROF & IPROF
LDL
SBHP SURVEY
OIL PHASE BOTTOM HOLE SAMPLE
OIL PHASE BOTTOM HOLE SAMPLE
OIL PHASE BOTTOM HOLE SAMPLE
LDL
PPROF W/DEFT
c
o&- ~~-
Date
12/24/04
11/09/04
06/03/05
10/12/05
06/24/05
08/16/05
08/05/05
11/20/04
01101/05
06/02/05
07/09/05
06/03/05
10/10/04
11/04/04
02/02/05
02/13/05
06/29/04
08/10/05
NO. 3503
Company: State of Alaska
Alaska Oil & Gas Cons Comm
Attn: Helen Warman
333 West 7th Ave, Suite 100
Anchorage, AK 99501
Field: Prudhoe Bay
BL
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
Color
CD
Alaska Data & Consulting Services
2525 Gambell Street, Suite 40
Anchorage, AK 99503- 8
ATTN: Beth
Received by:
ifl Î -l.h~~~ft-
10/18/05
-'
--
, ðJhri,
~:k~, .~
WGi\-' '1/ ¿()lloOs"
) STATE OF ALASKA ')
ALASKA Oil AND GAS CONSERVATION COMMISSION
APPLICATION FOR SUNDRY APPROVAL
20 MC 25.280
SEP 1 ~þ 2005
1;'\
(:¡
1. Type of Request: II Abandon / [J Suspend [J Operation Shutdown [J Perforate [J Other
[J Alter Casing [J Repair Well [J Plug Perforations [J Stimulate [J Re-Enter Suspended Well
[J Change Approved Program [J Pull Tubing [J Perforate New Pool [J Waiver [J Time Extension
2. Operator Name:
BP Exploration (Alaska) Inc.
3. Address:
P.O. Box 196612, Anchorage, Alaska
7. KB Elevation (ft):
4. Current Well Class:
..-/::
III Development 0 Exploratory
o Stratigraphic 0 Service
5. Permit To Drill Number
197-224 /'
6. API Number: ".,...--'
50- 029-22166-01-00
99519-6612
92.11
9. Well Name and Number:
PBU P-06A /'
8. Property Designation:
028288
10. Field / Pool(s):
Prudhoe Bay Field / Prudhoe Bay Pool
,', ',I P~C$:E:";ITWI:CL:' CO·L,IÐrtlt':i\t.llsl',;I..Jlr.;i1 J\.Þ~""',,'./';I'I··' ,¡., ""."",1 "',::, ";,:1:\':':1:'",:,)",."",;:,,,:,,':,',,1,';1'," ,1,:,',1,' '....., "",1,1' ""...1 :"",'.,"",,.,1,',',1,.:, ,:,','"
. .:' , ....,¡..,:;,'~, . .., ".... I :,.. , ,!"" "", ,'Y,'~ ",.~~,~I,IY1',~~.,~I'r"" .' :",:., '." "",'''''',' ,I, ",":1·' ,I "",1',,1, ":'" ",. >"1:1"" "", .1" ,., ,,', ,',' ", "",1' "." ,',I ",II"'"
Effective Depth MD (ft): Effective Depth TVD (ft): Plugs (measured): Junk (measured):
12063 9090 None None
1t;,,:'
Total Depth MD (ft):
12130
Casing
Structural
Conductor
Surface
Intermediate
Production
Liner
I 1.1 ,I :,,::::~:! ;:" /':,: I': ,::: ';: I, I I I I ': ''''1:;';; ; ¡,:';:
Total Depth TVD (ft):
9120
'têli9th
Liner
120' 20" 120' 120'
2687' 10-3/4" 2687' 2687' 5210 2480
9967' 7-5/8" 9967' 8893' 8180 5120
300' 5-1/2" 9739' - 10039' 8728' - 8947' 7740 6280
2132' 2-7/8" 9998' - 12130' 8916' - 9120' 13450 13890
Perforation Depth MD (ft): Perforation Depth TVD (ft):
10425' - 11900' 9043' - 9054'
Packers and SSSV Type: 7-5/8" x 4-1/2" TIW 'HBBP' packer;
4-1/2" Otis SSSV Nipple
Tubing Size:
4-1/2", 12.6#
Tubing Grade:
13Cr80
Packers and SSSV MD (ft): 9677'
2103'
Tubing MD (ft):
9743'
12. Attachments:
a Description Summary of Proposal
o Detailed Operations Program
14. Estimated Date for
Commencing Operations:
o BOP Sketch
13. Well Class after proposed work: ~
o Exploratory a Development 0 Service
16. Verbal Approval:
Commission Representative:
17. I hereby certify that the foregoing is true and correct to the best of my knowledge.
Printed Name Ted Stagg Title CT Drilling Engineer
Signature q!~ Phone 564-4694
~ Commission Use Only
October 1, 2005
Date:
15. Well Status after proposed work:
o Oil 0 Gas
o WAG 0 GINJ
o Plugged
DWINJ
/'
III Abandoned
o WDSPL
Contact Ted Stagg, 564-4694
Conditions of approval: Notify Commission so that a representative may witness
Q I ,/ Prepared By Name/Number:
Date 1.11Ic~- Terrie Hubble, 564-4628
I Sundry Number:(~- ~ll
o Plug Integrity
o BOP Test
o Mechanical Integrity Test
o Location Clearance
Other: ;'\1) Il) () if I' J R ("'^- 10 - 40 I V' eú tÑ\.:'"" d .co v ç;, J~ f..-NfL ¡,W tI p- 0" ß ò
RBDMS BFL SEP 2 0 2005
Subsequent Form Required: 10 - 40"7.
Approved By:!7Ù ¡J~-~J-
Form 10-403 R~'~/200/~~ I
COMMISSIONER
APPROVED BY
THE COMMISSION
Date 7~ w ~ ()~
Submit In Duplicate
t>~~,t
! ._~. I i\ 1
I: \, ...
L~
)
)
~~tember19,2005 ~_,~
From: Jane Williamson / ¡v 1.
Subject: Prudhoe Well p-OIA Plug-back for SIT
v wGA- (;
BP has requested approval to plug-back p-01A in preparation for a sidetrack. The
production history of the well is shown below. The current wellbore was drilled as an
injector, and was pre-produced from 1998 until August 2002. The production had
declined to less than 100 BOPD. The well has a collapsed 2 7/8" liner at around 1 0,550'
md. The new sidetrack is planned as a WAG injector into Zone 4B. There are no
reserves remaining in the well and inj ection support in the area will help improve
hydrocarbon recovery.
Date:
To:
I recommend approval of this sundry request.
100 -
PRUDHOE BAY, PRUDHOE Oil
PBU P
· ! ...~~~~.... ... ......... . ..... ... ... ........ :~"- :.~~:.:7:~~~::~~ I -
;':"') .. . ... ........ .... .... .....,:.. ..... ............ ..... ..... .j" - Cum 011 Prod ( MMbbl )
_ G.. 1011 R.llo ( Mcf/bbl )
. .....¡..... .......... ............·..í· ........... ..'''.''............''!. ··..··....·........··...,,·..·....·i . ..................... .... WeterCut
"........... ····1·..·.·.·..,.·,·..,)··· '.:. .... .. ..... ... ...,...................i ...
1\.1 . .......;¡)-~ !Ûí()~
·~'b (
I
1000
~:......._.~.~.
Oú
5
.
.
1 --r-rr-"1r;~-'Tï~'-'I-·'n-,--r-l~~-:-.r-'T~-T~l-rT-r;~~-nl-r~rr-ï"r011' I , I I I I I '-r-;;;1-¡'....-r-!-r-T--".,~;T.-r",'Tì-r·,T-,--,;r.."........'1-rr·ïT~~.-r-rr-1
Date
')
)
P·
¡
To: Winton Aubert
Petroleum Engineer
Alaska Oil & Gas Conservation Commission
From: Ted Stagg
CTD Engineer
Date: September 15,2005
Re: Prep Prudhoe P-06A for CTD sidetrack
Sundry approval is requested to prepare P-06A for a sidetrack. P-06A is a Zone 4 CTD sidetrack completed in
Dec. 1997. P-06A was intended to be a pre-produced injector but was produced until August 2002 when the well
was shut-in due to low productivity and limited well work options due, in part, to a collapse in the 2 7/8" liner at /'
approx. 10,550' MD.
The sidetrack, P-06B, is scheduled to be drilled by Nordic 1 on or about October 12,2005. The,plan'callsfor
plugging the P-06A 2 7/8" liner prior!9 setting a whipstock for an exit in the Shublik interval. P-06B will'target
Zone 4B with an undulating sidetrack to be completed as a water/MI injector to support producers P-25Ll, P-25 ~
and P-26. The following describes work planned and is submitted as an attachment to Form 10-403. A schematic, '
diagram of the proposed sidetrack is attached for reference.
^
Pre-Rig Work
1) Complete integrity testing.
2) Drift 2 7/8" liner and set a CIBP at 10,025' MD (8844'ss). /'
3) Set mechanical whipstock at 9974' MD (8806'ss). '/
4) Remove flow line, remove well house, and level pad.
The pre CTD work is slated to begin about Oct. 1, 2005.
Rig Work T\tv{ s \ 0 .~ 4 o'~ ~)I) ro t/ ~ (
1) MIRV Nordic 1 and test BOPE.
2) Mill 3.80" window in Shublik interval.
3) Drill sidetrack into Zone 4B target with Resistivity logging.
4) Run solid liner and cement. ,/
5) Cleanout liner and perforate for inject ion.
6) Freeze protect well and RDMO.
Post- Rig Work
1) Instal) well house, injection line and injection facilities.
Ted Stagg
CTD Drilling Engineer
564-4694
CC: Well File
Sondra Stewmanrrerrie Hubble
)
)
TREE = 4-1/16" CW
WELLHI;A 0 = 5M FWC
...... ........... . .
ACTI...LA. TOR = 011S
KB. 8..EV =m . . 77.00;
BF. ElËV ;·55:41'
KÖÞ~ ···4900'
Mix Angle ;;;'1Ú3 @i 10553'
D3iurrirvÐ = ., '9964'
'[kÙüiiïwÖ;';; .... '···8800"55
SAFElY NOTES: CHROME 4-112" TBG & 5-1/2" LNR.
4-1/2" XN NIP @ 9731'15 MILLED TO 3.80"ID.
WaLANGLE>70° @ 10150' & >90o@ 10364'. ID
OBSTRUCTION@ 10550' CTM.MILLED TO 10568'
CTM W / 2.25" ON 11/05/01 .
1""
P-06A
2103' H4-112" OTIS SSSV NIP, 10= 3.813" 1
GAS LIFT MA.NDRELS
ŒV lYÆ VLV LATCH
o CAMOO Drv1Y BK
25 CAMOO 0rv1Y BK
39 CAMOO Drv1Y BK
43 CAMOO Drv1Y BK
44 CAMOO Drv1Y BK
-..:
.,
ST MD
~ 5 2985
4 5514
3 7729
2 9267
1 9636
TVD
2893
5389
7133
8297
8565
FORT DATE
o 04/18/04
o 04/18/04
o 04/18/04
o
o 04/18/04
~
110-3/4" CSG. 45.5#, NT-80, 10= 9.950" H 268T
L
Minimum ID = 2.37" @ 9998'
TOP OF 2-7/8" LINER
H4-112" A<RSWS NIP, 0=3.813"
H7-518" X 4-1/2" TIW HBBP PKR, 10 = 4.00"
H4-112" A<RSWS NIP, 0 =3.813" 1
H4-112" A<RSWN NIP,MILLEDT03.80" 1
H7-518" X 5-1/2" TIW LNR HGR WrnEBAO<
H4-112" WLEG, 0 = 3.958" 1
H8..rvÐ IT LOG NOT AVAILABLE 1
1
I
~ ~ :
,~
1
I
9664'
14-112" TBG, 12.6#, 13-CR, ,0152 bpf, 10= 3.958" H 9675'
:8:
::g"
9677'
9709'
9731'
9739'
9743'
9732'
l
.~.:......¡i.''''.:'.
~ II
14-112" TBG,12.6#, 13-CR, .0152bpf, 10= 3.958" 1-1 9742'
17-5/8" CSG, 29.7#, NT-95-HS, 10 = 6.875" H 9966'
1 TOP OF 2-7/8" LNR, 10 = 2.37' H 9998'
...
~
1
PERFORATION SUrvtv1ARY
REF LOG: SPERRY SUN GR/ROPON 12/15197
ANGLE AT TOP ÆRF: 92 @ 10425'
Note: R9fer to Production DB for histortal perf data
SIZE SPF INTERV AL Opn/Sqz DATE
2" 6 10425 - 10475 0 08/06/03
2" 6 10499 - 10549 0 08/06/03
1-11/16" 4 10950 - 10990 0 12/25/97
1-11/16" 4 11010 - 11050 0 12/25/97
1-11/16" 4 11369- 11440 0 12/25/97
1-11/16" 4 11460 - 11480 0 12/25/97
1-11/16" 4 11812-11900 0 12/25/97
5-112" LNRMILLOUT WINDOW
10039' -1 0045' (OFF WHIPSTOO<)
/
ITOPOFWHIPSTOO< H 10040'
IRA TAGH 10049'
ITOPOFC8v£NT H 10072'
~
.
15-1/2" Lt-.R, 17#,13-CR, 10 = 4.892" H 10470' I
1 2-7/8" Lt-.R, 6.5#, LBO, .00579 bpf. 10 = 2.37" H
00\1E
05123191
12/25197
11/22~ 1
08l06~3
04l18~4
REV BY CO fvtv1 BITS
SJA ORIGINAL COM PLETION
PARKER CTD SIDETRACK (P-06A)
a-i/1P CORRECllONS
JLGflLP A !:PERFS
KSlKAK GL V ao
DATE
REV BY
Ca\t1tvENTS
PRLDI-OE BAY LNfT
WELL: FlO6A
PERMT /'.b: 197-2240
API /'.b: 50-029-22166-01
SEC 31 , T11 N. R13E, 2506' FSl & 1963' FI/v'L
BP Exploration (Alas ka)
TREE = ~ 4·1/16" CIW
WELLHEA D = 5M FMC
ACTUA TOR = OTis
KB. ELEV = 77.90'
BF. ELEV = 55.41'
KOP = 4900'
Max Angle = 103 @ 10553'
Datum MD = 9964'
Datum TV D = 8800' SS
)
110.3/4" CSG, 45.5#, NT·80, ID = 9.950" I.,
2687' ~
I TOP OF 3-3/16" LN~.,
TOp of Cement l-i
13.5" X Nip 2.813" IDI-f
9650' ~
9650' 1
9660' 1
14.1/2" TBG, 12.6#, 13-CR, .0152 bpf, ID = 3.958" I., 9675'
14-1/2" TBG, 12.6#, 13-CR. .0152 bpf, ID = 3.958" I., 9742'
NOTE: Tailpipe has backed off and is .
resting on the 5 1/2" liner top
P-06B
Proposed CTD Sidetrack
e
L
t:;I
I I
:8: :g-
~~;J
l 1
.
)I .,
17.5/8" CSG, 29.7#, NT-95-HS, ID = 6.875" I., 9966' 1----41
Top 2 7/8" Deployment Sleeve 10,002'
ÆRFORA TION SUMMARY
REF LOG: SÆRRY SUN GRlROP ON 12/15/97
A NGLE AT TOP ÆRF: 92 @ 10425'
Note: Refer to A-oduction DB for historical perf data
SIZE SPF INTERV AL Opn/Sqz DA TE
2" 6 10425 - 10475 isolated proposed
2" 6 10499 - 10549 isolated proposed
1-11/16" 4 10950 - 10990 isolated proposed
1-11/16" 4 11010 - 11050 isolated proposed
1-11/16" 4 11369 - 11440 isolated proposed
1-11/16" 4 11460 - 11480 isolated proposed
1-11/16" 4 11812 - 11900 isolated
proposed ~ ~
10040' U~
10049' 1/ A
I TOP OF WHIPSTOCK I.,
1 RA TAG I.,
~
SAR..~OTES: CHROME 4-1/2" TBG& 5-1/2" LNR
4-1/2" XN NIP @ 9731'15 MILLED TO 3.80"ID.
WELL ANGLE > 70° @ 10150' & > 90° @ 10364'. ID
OBSTRUCTION @ 10550' CTM. MILLED TO 10568'
CTM W/2.25" ON 11/05/01.
2103' 1"4-1/2" OTIS SSSV NIP, ID = 3.813"1
GAS LIFT MANDRELS
DEV TYPE VLV LATCH
o CAMCO DMY BK
25 CAMCO DMY BK
39 CAMCO DMY BK
43 CAMeO DMY BK
44 CAMeO DMY BK
. ST MD TVD
· 5 2985 2893
4 5514 5389
3 7729 7133
2 9267 8297
1 9636 8565
PORT DATE
o 04/18/04
o 04/18/04
o 04/18/04
o
o 04/18/04
9664' 1.,4.112" A<R SWS NIP. ID = 3.813"
9677' I., 7·5/8" X 4-1/2" TIW HBBP A<R, ID = 4.00" 1
9709' 1"4-1/2" A<R SWS NIP, ID = 3.813" 1
9731' 1"4-1/2" A<R SWN NIP, MILLED TO 3.80" 1
9739' I., 7-5/8" X 5-1/2" TIW LNR HGR W ITIESA CK 1
9743' 1"4-1/2" WLEG, ID = 3.958" 1
9732' I., ELMD TT LOG NOT A V AILABLE 1
9974' l-i fv1echanical Whipstock 1
/
1-i3 3/16" x 2 7/8" X-overl
I 3-3/16" x 2 7/8" cmt'ed and perfed]-i 12100'
5-1/2" LNR MILLOUT WINDOW
10039' -10045' (OFF WHIPSTOCK)
I TOP OF CEMENT I., 10072'
15-1/2" LNR. 17#, 13-CR, ID = 4.892" 1--1 10470'
I 2-7/8" LNR, 6.5#, L80, .00579 bpf, ID = 2.37" I.,
DATE
OS/23/91
12/25/97
11/22/01
08/06/03
04/18/04
REV BY COMMENTS
SJA ORIGINAL COM PLETION
PARKæ CTD SIDETRACK (P-06A)
CHITP CORRECTIONS
JLGfTLP ADÆRFS
KS/KAK GL V C/O
DATE
REV BY
COMMENTS
PRUDHOE BA Y UNIT
WELL: P-06A
ÆRMIT No: 197-2240
API No: 50-029-22166-01
SEe 31, T11 N, R13E. 2506' FSL & 1963' FWL
BP Exploration (Alas ka)
Schlumberger
Alaska Data & Consulting Services
2525 Gambell Street, Suite 400
Anchorage, AK 99503-2838
ATTN: Beth
Well
t./MPF-57A .~O.J - , 6'7
, 02-28A !À. \') lj ... í ft, y
j os 18-23A \ G\ ) '- !"q (
/OWDW-SE iÒc" J.) 'i
v E-23B (2ee ì q " '"'"
v E-23B ' I II-- /-
(., P-06A ¡ q 7 -)... J.I.-I
¡/Y-09A IG7- ~,3.J
\/ P2-49 Ie¡ l"'C). '-I
~' os 04-23A 1 q 3,· ~ 0}
vD.S.16-01 J ~ 0 -,' J ~
./ 4-10A/L-28 .2~")..:3 3
-,' 01-49/P-21 f 8 g .~ Q 73
.../01-57/R-23 /JI :1'- /(...(
BP Exploration (Alaska) Inc.
Petrotechnical Data Center LR2-1
900 E. Benson Blvd.
Anchorage, Alaska 99508
Job#
10672349
10928607
10942206
10893097
10889133
11039119
N/A
10942222
11062633
11051072
1105228
10662991
11072870
11072871
.c:o;r. ;'-.. .·..!r.:.'·.·.·..h'.·.b.=-.·.Itc.. ..¡'.·:-,...r,_.. .",'J ' £- In' I
~ ~ M \1 ~,~ _ _~ 07 (; 6 ~: J CJ 5
Log Description
CHANNEL DETECTION LOG
MCNL
MCNL
RST-BORAX CHANNEL DETECTION LOG
LEAK DETECTION LOG
LEAK DETECTION LOG
LEAK DETECTION LOG
MEM PPROF W/DEFT
PRODUCTION PROFILE W/DEFT
PRODUCTION LOG W/DEFT
INJECTION PROFILE U r <:.
RST
PRODUCTION PROFILE W/GHOST
PRODUCTION PROFILE W/GHOST
Date
01/24/04
12/11/04
04/20/05
03/25/05
07/16/04
05/08/05
06/04/05
07/14/05
07/02/05
07/13/05
07/21/05
02/05/04
07/11/05
07/12/05
Date Delivered:
,) 17'/ vZJ\'1.t"
08/04/05
NO. 3447 \ 0\1-:f.."2J.f
Company: State of Alaska
Alaska Oil & Gas Cons Comm
AUn: Helen Warman
333 West 7th Ave, Suite 100
Anchorage, AK 99501
Field: Prudhoe Bay
BL
1
Color
CD
1
1
1
1
1
1
1
1
1
1
1
1
J}ÂIC( :
13:2 J g
}Jl[lG
_7'
Alaska Data & Consulting Services
2525 Gambell Street, Suite 400
Anchorage, AK 9~P~3~;ft¡38 I ,¡/ í
A TTN: Beth .r f ¡ /' /If¿J r I ./
// o' I J / .I
Received by:/~f({/v~~1:.; (.j' . ~fj
( STATE OF ALASKA (
ALASKA OIL AND GAS CONSERVATION COMMISSION
REPORT OF SUNDRY WELL OPERATIONS
1. Operations Performed:
Abandon D
Alter Casing 0
Change Approved Program 0
2. Operator
Suspend D
Repair Well 0
Pull Tubing 0
Operation Shutdown D
Plug Perforations D
Perforate New Pool D
4. Current Well Class:
Perforate ŒI WaiverD
Stimulate 0 Time Extension D
Re-enter Suspended Well D
5. Permit to Drill Number:
197-2240
OtherD
Name:
BP Exploration (Alaska), Inc.
3. Address: P.O. Box 196612
Anchorage, Ak 99519-6612
7. KB Elevation (ft):
Development Œ]
Exploratory 0
92.11
8. Property Designation:
ADL-028288
11. Present Well Condition Summary:
Stratigraphic D Service 0
9. Well Name and Number:
P-06A
10. Field/Pool(s):
Prudhoe Bay Field / Prudhoe Oil Pool
6. API Number
50-029-22166-01-00
Total Depth measured 12130 feet
true vertical 9120.5 feet
Effective Depth measured 12063 feet
true vertical 9089.8 feet
Plugs (measured)
Junk (measured)
None
None
Casing Length Size MD TVD Burst Collapse
Conductor 80 20" 91.5# H-40 37 117 37.0 - 117.0 1490 470
Liner 300 5-1/2" 17# 13Cr80 9739 - 10039 8727.9 - 8946.7 7740 6280
Liner 2132 2-7/8" 6.5# L-80 9998 - 12130 8916.0 - 9120.5 10570 11160
Production 9931 7-5/8" 29.7# NT-95HS 35 - 9966 35.0 - 8892.6 8180 5120
Surface 2651 10-3/4" 45.5# NT-80 36 - 2687 36.0 - 2687.0 5210 2480
Perforation depth:
Measured depth: 10425 -10475,10499 -10549,10950 -10990,11010 -11050,11369 -11440,11460 -11480,11812 -11900
True vertical depth: 9042.92 - 9038.7,9034.44 - 9023.93,9008.85 - 9010.25,9011.52 - 9014.77,9033.29 - 9040.69,9042.83 - 9044.98
9047.2 - 9054.15
Tubing (size, grade, and measured depth): 4-1/2" 12.6# 13Cr80
@
33
9742
RECEI\/ED
JAN 2 0 2004
Packers & SSSV (type & measured depth):
4-1/2" TIW HBBP-R Packer
@ 9677
12. Stimulation or cement squeeze summary:
Intervals treated (measured):
Treatment descriptions including volumes used and final pressure:
Representative Daily AveraQe Production or Injection Data
Gas-Met Water-Bbl Casing Pressure
0.22 962 1570
Alaska Oil & Gas Cons. Commission
Anchorage
13
Oil-Bbl
Subsequent to operation:
15
0.21
920
1100
Tubing Pressure
330
300
Prior to well operation:
6
14. Attachments:
15. Well Class after proposed work:
ExploratoryD
DevelopmentŒ]
Service D
Copies of Logs and Surveys run _
16. Well Status after proposed work: Operational Shutdown D
OilŒ] GasO WAG 0 GINJO WINJD WDSPLO
Prepared by Garry Catron (907) 564-4657.
Sundry Number or N/A if C.O. Exempt:
N/A
Daily Report of Well Operations. !
17. I hereby certify that the foregoing is true and correct to the best of my knowledge.
Contact Garry Catron
Printed Name Garry Catron
Ji{ Cdr..-L,
~ÇANNEt; JANi 2 1 2004
Form 10-404 Re;;sed 12/2003 0 RIG I N A L
Title
Production Technical Assistant
Signature
Phone 564-4657
Date
1/16/04
,M\OO .~ 1 (~~~~
~ ( (
P-06A
DESCRIPTION OF WORK COMPLETED
NRWO OPERATIONS
EVENT SUMMARY
08/04/03 MIRU unit #9. On line with MEOH and then 2% KCL to kill well. Job in progress.
08/05/03 RIH with SWS memory logging tools in carrier. Retrieved good data. RIH with SWS 2in perf
guns-6spf-60 deg-( All guns loaded the same) perf interval 1 05241-1 05491(251) POH all shots
fired. MU & RIH with SWS #2 perf gun, perf interval 1 04991 to 105241 (25') POH all shots fired.
RIH with memory logging tools. Unable to work past tubing tail/ packer stub. POH. Job in
progress.
08/06/03 RIH with SOS logging tools in carrier. Tagged up at 10369 (up). Pump 30 bbls down
backside. Log down from 10000 to 10500 at 60 fpm with slight bobble at 10369. Log up over
same interval and flag pipe at 10300. POH. Verify data. Good data.
08/06/03 RIH with SWS 2in perf guns-6spf-60 deg-( All guns loaded the same) perf interval 1 04501-
104751, 6 SPF (251) POH all shots fired. MU & RIH with SWS #4 perf gun, perf interval 104251-
10450' 6 SPF. POH, all shots fired. FP well.
FLUIDS PUMPED
BBLS
19 1 % KCL
411 2% KCL
40 50/50 Methonal
20 Methanal
490 TOTAL
Page 1
~ (
lREE= 4-1/16" CW
WELLHEAD = 5M FWC P 0 6A SAFETY NOTES: CHROME 4-112" TBG& 5-1/2" LNR.
ACTlJI\ TOR = 011S - 4-1/2" XN NIP @ 9731' IS MILLED TO 3.80" 10.
KS. 8..EV = 77.00' Wa.LANGLE> 70° @ 10150' & >900@ 10364'. ID
BF. 8..EV = 55.41' OBSTRUCTION@ 10550' CTM. MI.LED TO 1 0568'
KOP= 4900' CTM W/2.25" ON 11/05/01.
Max Angle = 103 @ 10553'
Datum~ = 9964' 4-112" OTISSSSV NIp, ID= 3.813"
Datum "TV D = 8800' SS (I)
GAS LIFT M\NDRELS
ST MD TVD lEV 1YÆ VLV LATCH FORr DATE
10-3/4" CSG, 45.5#, NT-80, ID = 9.950" 5 2985 2893 0 CAMCO DOME BK 16 10/28/01
4 5514 5389 25 CAMCO DOME BK 16 10/28/01
3 7729 7133 39 CAMCO DOME BK 16 10/28/01
Minimum ID = 2.37" @ 9998' 2 9267 8297 43 CAMCO DI/ BK 0 10/28/01
TOP OF 2-7/8" LINER 1 9636 8565 44 CAMCO SO BK 22 10/28/01
4-112" A<RSWS NIP, D=3.813"
4-112"lBG, 12.6#, 13-CR, .0152 bpf, ID= 3.958" 9675'
7-518" x 4-1/2" TIW HBBP PKR, ID = 4.00"
-14-112" A<RSWS NIP, D = 3.813"
4-112" A<RSWN NIP, MILLED TO 3.80"
7-518" X 5-1/2" TIW LNR HGRWrnEBAO<:
-14-112" WLEG, D = 3.958"
4-112" lBG, 12.6#, 13-CR, .0152 bpf, ID = 3.958" H I
8..M:> TT LOG NOT AVAILABLE
17-5/8" CSG, 29.7#, NT-95-HS, ID = 6.875" I
ITOPOF2-7/8"LNR, ID= 2.37" 1
PERFORATION SUMMARY
REF LOG: SPERRY SUN GRlROPON 12/15/97
A NGLE AT TOP ÆRF: 92 @ 10425'
Note: Refer to Produetion DB for historcal perf data
SIZE SPF INTERV AL Opn/Sqz DATE
2" 6 1 0425 - 1 04 75 0 08/06/03
2" 6 10499 - 10549 0 08/06/03
1-11/16" 4 10950- 10900 0 12/25/97
1-11/16" 4 11010 - 11050 0 12/25/97 5-112" LNR MILLOUT WINDOW
1-11/16" 4 11369-11440 0 12/25/97 10039'-10045' (OFF WHIPS TOO<:)
1-11/16" 4 11460 - 11480 0 12/25/97
1-11/16" 4 11812-11900 0 12/25/97
TOPOFWHlPSTOO<: I
IRA TAG I
TOPOFCEfvENT I
15-1/2" LNR, 17#, 13-C R, ID = 4.892" 1
12-7/8" LNR, 6.5#, L80, .00579 bpf, ID = 2.37" 1-1 12130' ~
DA 1£ REV BY COMMENTS DATE REV BY COMrvENTS PRUDH:>E BAY LNIT
05123/91 SJA ORIGINAL COM PLErION WELL: ~06A
12/25/97 PARKER CTD SIDErRACK PERMT I\b: 197-2240
11/22/01 CH/lP CORREC110NS APII\b: 50-029-22166-01
08/06/03 JLG/TLP A (PERFS SEC 31 , T11 N, R13E, 2506' FSL & 1963' FWL
BP Exploration (Alas ka)
AOGCC Geological Materials Inventory
~oAk~
PERMIT
97-224
BP EXPLORATION
Log Data
8224 ~P. ERRY GR
89~3 ~'/SCHLUM SLIM-AIT
NGP-MD ~ 10055-12130
NGP-TVD j 8867-9028
SLIM-AIT x.~9900-10090
SRVY CALC /4V'~BP 10026.2-12130.
:~-407 Completion Date ]),,/),~ lc? ~ Daily well ops
Are dry ditch samples required? yes .-f~"~o And received? --.__.__y_es~ .... ~no
Was the well cored? yes ~no Analysis _description received?
Are tests required? ...... y_es ....... no Received?
Well is in compliance __
tlnitial
Comments
Sent Received
1/21/1998 1/21/1998
10/15/1998 10/20/1998
1/21/1998 1/21/1998
1/21/1998 1/21/1998
10/15/1998 10/20/1998 T
1/20/1998 2/3/1998
Box
-~-yes ..... mo
Wednesday, October 13, 1999 Page 1 of 1
GeoQuest
3940 Arctic Blvd
Anchorage, AK 99503
ATTN: Sherrie
NO. 11576
Company:
Alaska Oil & Gas Cons Comm
Attn: Lori Taylor
3001 Porcupine Drive
Anchorage, AK 99501
1 0/1 5/98
Field: Prudhoe Bay (Open Hole)
LIS
Well Job # Log Description Date BL Sepia Tape
P-06A ~ --z~'[ ~.~ 98148 SLIM ACCESS AlT 12/1 6/97 I 1 1
PLEASE ACKNOWLEDGE RECEIPT BY SIGNING AND RETURNING ONE COPY EACH TO:
BP Exploration (Alaska) Inc.
Petrotectnical Data Center MB3-3
900 E. Benson Blvd.
Anchorage, Alaska 99519-6612
Date Delivered:
Schlumberger GeoQuest
3940 Arctic Blvd
Anchorage, AK/..9~503
A-I-tN: S~
Receive~ b~y: .,/
STATE OF ALASKA
ALASK "L AND GAS CONSERVATION COMIV 'ON
WELL COlOr ~ETION OR RECOMPLETION FIEPOFI~ ~.. iD LOG
1. Status of Well Classification of Service'W~ll"'
~/"~ ,~Oil I~Gas []Suspended E~]Abandoned _ Service F.'~:Tr},.E, '--'~'.;
2. Name of Operator 7. Permit Number -
BP Exploration (Alaska) Inc. 97-224 ,~b,,~.., ,~:
3. Address 8. APl Numb'e"r"'"'"' ~'~ '~ bas b'0rl$,
P. O. Box 196612, Anchorage, Alaska 99519-6612 ............... 50-029-22166-01
4. Location of well at surface .~ ............ ~ ~'~,,-W~,~'~,~ 9. Unit or Lease Name
2506' NSL, 1963' EWL, SEC. 31 T11N, R13E .;:',~ ;': ;': ;.i; ; ,~:,,: ~t Prudhoe Bay Unit
At top of productive interval i ~/~~ ~.,'..-.~~.~r , ~.j 10. Well Number
........ : P-06Ai
1902' NSL, 1823' EWL, Sec.30, T11 N, R13E
....... Prudhoe Bay Field / Prudhoe Bay
Lease Designation and Serial No. Pool
5. Elevation in feet (indicat~ KB, DF, etc.) 16.
KBE=92.11I ADL 028288
12. Date Spudded12/9/97 j13' Date T'D' Reached I 14' Date C°mp" Susp" °r Aband'115' Water depth' if °ffsh°re 116' N°' °f C°mpleti°nsl 2/16/97 1 2/24/97 N/A MSLI One
17. Total Depth (MD+TVD) 118. Plug Back Depth (MD+TVD)119. Directional SurveyI 20. Depth where SSSV set~21. Thickness of Permafrost
12130 9028' ETI 12063 8999S FTI [~ Yes [-] No I 2103 MD ! 1900' (Approx.) ....
22. Type Electric or Other Logs Run
GR
23. CASING~ LINER AND CEMENTING RECORD
CASING S E-I-FING DEPTH HOLE
SIZE WT. PER FT. GRADE TOP BO-FrOM SIZE CEMENTING RECORD AMOUNT PULLED
27/8" 6.16# L-80 10100 12130 33/4" 110 c.f.
24. Perforations open to Production (MD+TVD of Top and Bottom 25. TUBING RECORD
and interval, size and number) SIZE DEPTH SET (MD) PACKER SET (MD)
MD TVD
11812-11900 8955-8957 1-11/16, 4 spf
11369-11440 8942-8951 26. AC~D, FRACTURE, CEMENT SQUEEZE, ETC.
11460-11480 8951-8952 DEPTH INTERVAL (MD) AMOUNT & KIND OF MATERIAL USED
10950-10990 8917-8917 .....
11010-11050 8919-8923
27. PRODUCTION TEST
Date First Production IMethod of Operation (Flowing, gas lift, etc.)
I
Date of Test Hours Tested PRODUCTION OIL-DEL GAS-MCF WATER-BBL CHOKE SIZE I GAS-OIL RATIO
I
FOR TEST ·
Flow Tubing ~,Casing Pressure 0ALCULATED · OIL-DEL GAS-MCF WATER-BBL OIL GRAVITY-APl (CORR)
Press. __.4-HOUR RATE
28. CORE DATA
Brief description of lithology, porosity, fractures, apparent dips and presence of oil, gas or water. Submit core chips.
Form 10-407 Rev. 07-01-80
ORIGINAL Submit In Duplicate
29. Geologic Markers 30. ormation Tests
Measured True Vertical Include interval tested, pressure data, all fluids recovered
Marker Name
Depth Depth and gravity, GOR, and time of each phase.
~SAD 10083 8886
31. List of Attachments
Summary of Daily Drilling Reports, Surveys
~2. I hereby ce. rtiiy that the foregoing is true and correct to the best of my knowledge
Signed ~,_.9~~ ~ Title ~.,,~" b/i~/,,~,~ T//~ Date J/~0] ~
Prepared ~y Name/Number: Theresa Mills 564-5894
'NSTFIUOTION$ ORIGINAL
t~iEN£RAI: This form is designed for submitting a complete and correct well completion report and log on all types of lands and leases
in Alaska.
ITEM 1: Classification of Service Wells: Gas injection, water injection, steam injection, air injection, salt water disposal, water supply
for injection, observation, injection for in-situ combustion.
ITEM 5: Indicate which elevation is used as reference (where not otherwise shown) for depth measurements given in other spaces on
this form and in any attachments.
ITEM 16 AND 24: If this well is completed for separate production from more than one interval (multiple completion), so state in item
16, and in item 24 show the producing intervals for only the interval reported in item 27. Submit a separate form for each additional
interval to be separately produced, showing the data pertinent to such interval.
ITEM 21: Indicate whether from ground level (GL) or other elevation (DF, KB, etc.).
ITEM 23: Attached supplemental records for this well should show the details of any multiple stage cementing and the location of the
cementing tool.
ITEM 27: Method of Operation: Flowing, Gas Lift, Rod Pump, Hydraulic Pump, Submersible, Water Injection, Gas Injection, Shut-In,
Other-explain.
ITEM 28: If no cores taken, indicate 'none'.
Form 10-407 Rev. 07-01-80
WFI I HFAD: 11" - RM FMC,
~ I SSSV LANDING NIPPLE
OI i (OTIS)(3.813" ~D) I 2103'
~ I
CMT'~-- B
45.5#/ft,1 2687'I
(C~,I~ICO W/1" E K LATCH~
NT-80 BTRS N-° MD(BKB) TVDss Ang
I KOP: 4800' I 5 2985' 2893' 0°
MAX ANGLE: 44° @ 9600' 4 5514' 5389' 24o
3 7729' 7133' 39°
i 2 9267'
8297'
43°
1 9636' 8565' 44°
! 4 1/2", 12.6#/ft, 13CR, ~--.
(PARKER) (3.813" ID) 9664'
CAPACITY: 0.0152 BBL/FT
Right-hand release
NOTE:,I J latch 19675'1
13 Chrome tubing and ! ~:~:] I'~~ 75/8" TIWPACKER
(HB-BP) (4.00" ID)
Liner!!!!! i 4 1/2", 12.6#/ft, 13Cr
TAILPIPE
4 1/2 .... SWS" NIPPLE
(PARKER) (3.813"1D), 9709____'
i~ ~~ 41/2 .... SWN"NIPPLEI
TOP OFTIW I 9739' I ~ ~1 (PARKER) (3.725" ID) 9731'
SWN = 9,732' ELMD
5 1/2"7 5/8",LINER29.7#/ft, ~ ~ ~ 4 1/2" WLEG (Parker)
NT-95HS NSCC I 9966' I i
2 7/8" Liner Top-9998'
! 2 7/8" 6.16 #/ft, L-80, ST-L
SIDETRACK PERFORATION SUMMARY: J I.D.-2.37" Cap.- 0.00579 Bbl/ft
REF LOG: SPERRY SUN GPJROP (12-15-97) ~ Top
Whipstock
at
1
0040'ELMD,
II
SIZE SPF INTERVAL OPEN/SQZ'D ~ R'~ AMArker at 10048.9'
1.69 4 10950-10990 OPEN
1.69 4 11010-11050 OPEN
1.69 4 11460-11480 OPEN TD-12,130'
1.69 4 11812-11900 OPEN ii~i~i{ii!i~iii~! ~ PBTD-12,063'
~n,,~n..';.-'u.:='.,u.= ~ I Top of Cement at 10072' I
I
I
~i~iii~!~!!iii~ill ~ PT to 1000 psi
CTD HORIZONTAL SIDETRACK
~ I ~:~:: ......................
~-1~2", 17 #/~, 1~c~, FL4S
DATE REV. BY COMMENTS PRUDHOE BAY UNIT
5-23-91 SJA INITIAL COMPLETION WELL: P-06ai (24-30-11-13)
6-11-91 EPT INITIAL PERFORATIONS
APl NO: 50-029-22166-01
7/14/91 EPT PRE-FRAC PERFORATIONS
SEC 31; TllN; RG13E
12/25/97 C. PARKER CTD HORIZONTAL SIDETRACK
BP EXPLORATION
SURVEY CALC [JLAT.ION S
Ceord~nates provided in: TR. UE relative ~'o web,head
GR~D re~tfive to wellhead
a.ad ALASKA STATE PLANE
Company: BP Ex'phm~t~on A~ask~ Rig: D/S C.T [JnR #7 AFE No:
Well: P~06AI Field: Prud~}oe Bay WOA Bltl Rep: l>hi~ Marwood
Calculation Method: Minimum Cu~'ature Mag. l)ec~nation: 28,150 ilob Start Date: 0S-Dec-97
Vertical Sect, Plane: 35(LSlB TRUE Grid Correction: 0,999 ,lob En.d Date: 16-Dec-97
Surv Measured From.: MD fi'om RKB, Total Correction: 27,15~ DLS per (
TVD fi:mn Se~ '~evet, ¢2.1
Survey Meas. Course Incl, "['RIJE Subsea Ve~ical DLS Coords. - TRUE (;RID Coords. - (gRID Coords. - ASP
No. Depth Length Angle AzL TVD Section N(+)/S(-)
ffi) (deg) (deg) (~) TRUE °/100~. Lat. (Y) Dep. (X) (deg) Lat.I ~e~. (x) Lat. (Y) Dep. (X)
Tie-in 10026.2 41.30 21.48 8845.00 3029.91 3032,43 -51..21 20.48 3031,07 -104.13 5950264.23 631142.3¢
2 10040.0 13.8 41.60 21.40, 8855.34 3038.19 2,21 3040,93 -47.87 20.40 3039.65 -100.94 5950272.79 631145.56
3 10049.1 9.1 41.57 21.40 8862.15 3043,67 0.33 3046.56 -45.67 20.40 3045.'29 -98.83 5950278.45 631147.67
4 10083,0 33.9 48.08 24.00 8886.18 3065.08 19.95 3068.58 -36,42 23.00 3067.~ -89.98 5950300.63 631156.52
5 10108.2 25.2 56.18 29.00 8901.65 3082.26 35.74 3086.33 -27.52 28.00 3085.'38 -81.38 5950318.54 631165.1.2
4 10134.7 26.5 66.67 38.79 8914.33 3100,64 51.12 3105.53 -14.50 37.79 3104.80 -68.70 5950337.96 631177.80
7 10177.4 42.7 79.48 48.40 8926.76 3128.27 36.89 3134.94 13.66 47.40 3134.~9 -41.06 5950367.85 631205.44
8 10208.0 30,6 85.87 59,05 8930.67 3144.65 40,33 3152.84 38.09 58.05 3153.0~ -16.94 5950386.1.8 631229.56
5 10239.3 31.3 79,01. 63.97 8934.79 3157,76 26.89 3167.64 65.33 62.97' 3168.'29 10.03 5950401.45 631256.53
10 10268.9 29.6 76.46 61.16 8941.08 3169.49 12.66 3180.96 91.00 60.16 3182.06 35.47 5950415.22 631281..97
11 10303.7 34.8 79.98 59.57 8948.18 3184.49 11.06 3197.81 120.60 58.57 3199.~ 64,77 5950432.58 631311.27
6 10330.3 26.6' 85.23 60.62 8951.60 3196.22 20.12 3210.95 143.46 59.62 3212,9~ 87.40 5950446.12 631333.90
13 10364.5 34.2 90.44 59.22 8952.89 3211.51 15.77 3228.07 173.02 58.22 '3230.'59 116.65 5950463.75 631363.15
14 10392.1 27.6 92.46 56.94 8952.20 3224.64 11.03 3242.66 196.44 55.94 3245.'59 139,81 5950478.75 631386.31
7 10431.9 39.8 92.31 53.17 8950.54 3245.39 9.47 3265.44 229.03 52.17 3268,93 172.00 5950502.09 631418.50
16 10458,7 26.8 95.71 50.61 8948.66 3260.57 15.87 3281.93 250.06 49.61 3285.79 192.74 5950518.95 631439.24
17 10480.1 21.4 99.84 48.501 8945.77 3273.31 21.63 3295.68 266.19 47.50 3299.81 208.63 5950532.97 631455.13
8 10513.4 33.3 102.04 44.63 8939.45 3294.29 13.18 3318.15 289.93 43.63 3322.70 231.97 5950555.86 631478.47
19 10553.4 40 102.74 39.54 8930.86 3321.62 12.55 3347.13 316.10 38.54 3352.13 257.64 5950585.29 631504.14
20 10589.1 35.7 101.60 34.44 8923.33 3348.15 14.32 3375.00 337.09 33.44 3380.36 278.14 5950613.52 631524.64
9 10621.0 31.9 100.90 29.34 8917.10 3373.65 15.83 3401.56 353.61 28.34 3407.20 294.19 5950640.36 631540.69
22 10646.5 25.5 97.65 26.00 8912.99 3395.18. 18.15 3423.84 365.29 25.00 3429.68 305.48 5950662.84 631551.98
23 10676.5 30 94.04 25.30 8909.94 3421.24 12.26 3450.74 378.21 24.30' 3456.80 317.93 5950689.96 631564.43
10 10704.3 27.8 92.37 24.94 8908.38 3445.61 6.14 3475.87 389.99 23.94 3482,13 329.27 5950715.29 631575.77
25 10729.9 25.6 90.55 18.62 8907.73 3468.74 25.68 3499.62 399.48 17.62 3506.05 338.34 5950739.21 631584.84
26 10757.3 27.4 90.26 15.28 8907,54 3494.41 12.24 3525.83 407.46 14.28 3532.39 345.87 5950765.55 631592.37
11 10794.7 37.4 87.36 10.18 8908.31 3530.30 15.68 3562.28 415.70 9.18 5568.98 353.47 5950802.14 631599.97
28 10823.8 29.1 85.08 5.61 8910.23 3558.75 17.52 3591.04 419.69 4.61 3597.80 356.96 5950830.96 631603.46
29 10856.2 32.4 85.69 2.09 8912.84 3590.77 10.99 3623.25 421.86 1.09 5630.05 358.56 5950863.21 631605.06
I I
Survey Meas. Course Incl. TRUE Subsea Vertical DLS Coords. - TRUE GRID Coords. - GRID C0ords. - ASP
No. Depth Length Angle Az[. TVD Section N(+)/S(-) N(+)/S(-) Azi. N(+)/S(-) N(+)/S(-) N(+)/S(~ N(+)/S(-)'''
ffi) (deg) (deg) (a) TRUE °/100R. Lat. (Y) Dep. (X) (deg) Lat. (Y) Dep. (x) Lat. (Y) Dep. (X)
12 1~878.6 22.4 86.57 360.86 8~14.35 3613.04 6.74 3645.59 422.43 359.86 3652.40 358.75 5950885.56 631605.25
31 10904.5 25.9 88.50' 358.05 8915.47 3638.88 13.15 '"3671.46 422.18 357.05 3678.26 358.05 '595091'1142 '63i6'04.55
32 10932.0 27.5 88.33 353,30 8916.23 3666.36 17.28 '3698.87 420.11. 352.30 3705.62 355.50 5950938.78 631602.00
13 10967.7 35.7 88.42 349.79 8917.24 3701.90 9.83 3'734.16 414.86 348.79 3740,82 349.64 5950973.98 631596.14
34 1.0999.3 3'1,6 86.31 345.57 8918.69 3733,09 14.92 3764.99 408.13 344,57 3771.53 342,37 5951004169 631588.87
35 1.1034.4 35.1 85.08 340,30 8921.33 3767.10 15.38 3798.44 397.86 339.30 3804,79 '331.52 5951037.95 63'1578.02
14 11064.8 30,4 85.08 341.00 89'23.94 3796.23 2.29 3827,02 387.83 340,00 3833.19 320,99 5951066.35 631567.49
37 11095.1. 30.3 84.29 335.38 8926,75 3824.86 18,65 3855.01 376.62 334.38 3860,99 30'9.30 5951.094.1.5 631555.80
38 11145.4 50.3 85,78 333.44 8931.10 3871.29 4.85 3900.21 354.98 332.44 3905.80 286,87 5951138.96 '631'5'3'3'.3~
15 11206,7 61.3 87.01 327.64 893'4.96 3926.27 9.65 3953.45 324,90 326.64 3958,51 255.87 5951.191.67 631502137
'40 11223.7 17 87.23 326.16 8935.81 3941.03 8.79 3967.67 315.63 325.16 3972.57 246.35 5951205173 631492,8~
41 11251.6 27.9 8'9.74 325,71. 8936.55 3965.04 9,14 3990.77 300.01 324.71 3995,39 230.33 5951228.55 63147'6.85
16 11289.2 37.6 89~12 321.66 8936.92 3996.63 10.90 4021..'06 277.75 320,66 4025.29 207.54 5951258.45 631454.04
43 11337.1 47.9 86.54 31.6,94 8938,74 4034.74 11,22 4057.34 246.54 315.94 4061.01 175.71 5951294.1.7 631422.2i
44 '11379.0 41.9 84.06 31'2,50 8942.17 4065.87 12.11 4086.71 216.88 311.50 4089.87 145.54' 5951323.03 631392.04
17 11476.9 97.9 83.82 300.54 8952.55 4128.36 12.15 4144.54 138.79 299.54 4146.32 66.45 5951379.48 631312.95
46 11505.0 28.1 85.22 298.17 8955.23 4143.53 9.76 4158.25 11.4.41, 297,17 4159.61 41184 5951,392.77 631288.34
47 11.547.1 42.1 88,59 300.'04 8957,50 4166.18 9.1.5 4178.70 77.69 299.04 4179,41 4.77 5951412.57 63125'1..25'
18 11563.6 16.5 90.18 303.38 8957.68 4175.69 22.42 4187,37 63.66 302,38 4187.83 -9.42 5951.420.99 631237.08
49 11578.2 14.6 89.57 308.16 8957.71 4184.92 33.01 41.95.90 51..81 307.16 4196,16 -21.41 5951429.32 631225.09
50 11594.2 16 89.03 306,37 8957.91 4195.37 11.68 4205.58 39.08 305,37 4205.62 -34.31 5951438.78 63121.2.1~
19 11632.4 38.2 89.56 315.51 8958.38 4222.08 23.96 4230.59 10.26 314.51 4230,12 -63.56 5951463.28 631182.94
52 1.1701.4 69 94.'92 321,84 8955.68 4276.49 12.01 4282.31 -35.24 320.84 4281.04 -109.95 595151.4.20 631136.55
53 11729.4 28 92.20 326.23 8953.94 4300,06 18.42 4304.93 -51.64 325.23 4303.36 -126.75 5951536.52 631119.75
20 11757.7 28.3 88.68 331.16 8953.72 4325.08 21.40 4329.09 -66.34 330.16 4327.27 -141.86 5951.560.43 631104.64
55 1181.0,8 53.1 88.42 334.50 8955.07 4373.69 6.31 4376.31 -90.58 333.50 4374.06 -166.92 5951.607.22 631079.58
56 1.1833.3 22.5 87.63 340,30 8955,84 4394.93 26.00 4397.06 -99.21 339,30 4394.66 -175.92 5951627.82 631070.58
21 11868.5 35.2 83.76 340.48 8958.48 4428.64 11,01 4430.12 -110.99 339.48 4427,51 -188.27 5951660.67 631058.23
58 11918.8 50.3 82.97 346.45 8964,30 4477.29 11.89 4477.99 -125.21 345.45 4475.12 -203.32 5951708.28 631043.18
59 11964.8 46 79.63 352.42 8971.26 4522.39 14.74 4522.66 -133.55 351.42 4519,64 -212.44 5951752.80 631034.06
22 11997.5 32.7 76.82 357.70 8977.94 4554.38 17.99 4554.54 -136.32 356.70 4551.47 -215.76 5951784.63 631030.74
61 12022.4 24.9 73.48 360.30 8984.32 4578.42 16.79 4578.60 -136.74 359.30 4575.51 -216.60 5951808.67 631029.90
62 12057.1 34.7 68.90 355.90 8995,51 4611.23 17.84 4611.41 -137.81 354.90 4608.30 -218.25 5951841.46 631028.25
23 12086.7 29.6 63.98 357.20 9007.34 4638.35 17.10 4638.48 -139.45 356.20 4635,34 -220.36 5951868.50 631026.14
64 12107.1. 20.4 61.08 359.60 9016.75 4656,44 17.64 4656.57 -139.96 358.60 4653.42 -221.18 5951886.58 631025.32
65 12130.0 22.9 57.82 2.30 9028.39 4676.10 17.48 4676.29 -139.64 1.30 4673.14 -221.21 5951906.30 631025.29
These surveys are correct to the best of my
knowledge.
Jon Mapes, Coiled Tubing Coordinator
Baker Hughes INTEQ~~4.~ ~_~
I I I
S U R V E Y C A L C (J L.A .[ .~ O .N S
Coordinates provided in: TRt~E relative ~:o we'~head
GRH. re,afl'ye to wellhead
a.m~ ALASKA STATE PLANE
Company: BP Exp~orat[~m Alaska Rig: D/S CT UnR #7 AFE No: dPt065
Wen: Pd~6A~ Field: Prud~'~oe I~ay WOA BHI Rep: '~q~l Marwood
Calculation Method: Mi~fimum (~rvatm'e Mag. l)ec~na.ti~m: 28.150 Job Sta~ Date: 05-Dcc-97
Vertical Sect. Plane: 356.503 TRUE Grid Correction: 0.999 Job End Date: 16-Dec~97
Surv Measured From.: MD fi'om RKB, Total Correction: 27.15~ DLS per ( It / m ): 100
TVD k~m'~ Sea ~evet. (92.1 R.)
.............. ' ......... ' ......... bis" ' ........................................................
Survey Meas. Course Incl. "['R~!E Subsea Ve~ical Coords. - TRUE ,GRID Coot(is. - GRil) Coords. - ASP
No. Depth Length Angle A. zk TVD Section ' N'(+)/S(-) 'N(+)/S(-) Azi. "' N(+))S(-) N(+)/S(-) N(+)/S(-) N(+)/S(-)
(a) (deg) (deg) (fi) TRUE °/100R. .... Lat. (Y) DeP. (X) (deg) ..... ~at: (X) ,Dep. ,(x) Lat. (Y) Dep. (X)
Tie-in 1.0026.2 41.30 21.48 8845.00 3029.9'1 '3~32.43' -51.2i 20.48 3031.07 -104.13 '5950264.23 631142.37
2 'i004o.0 ..... 13.8 41.60 2'i.40 8855.34 3038'.19 '' '2.'~1'' 3040.93 ' ~4~.8'7' 20.40 3039.63 ~100.94 '5950272.79 631145.56
3' i004'9.1 '' 9.i''4'1.57 2i.40 8862.'i5 .... 30~3.67 ........ 0.3'3 3046.56 -45.67' 20.40 30~5'.29 '-98.83 595027'8.45 631.147.67
4 i008'3.0 33.9 "48.08 24.00 8886.18"' 5065.08 1'9."~5 3068.58 -36.42 23.0'0 3067.47 -89.98 59503'~'0'.63 631156.52
5 10108.2' 25.2 ''56.18 29.00 8901.65 3082.26 35.74 3086.33 -27.52 ''28.0'0 "3085.38 -8ii'38 59503'18.54 63'1165'.12
4 10134.~ 26.5 '66.67 38.79 89i4.33 3100.64 " .5.1.12 31.05.~3 -14.50 37.79 ' 3104,80 -68.70 5950337'196 63il. 771'80
7 10177.4 42.7 '79.~8 48.40 8926.7'6 3128.27 3'6.89 3134.94 '13.66 47.40 3'134.69 -41.06 595036'7.85 631205.44
8 10208.0 30.6 85.87 59.05 8930.67 3144.65 40.33 3152.84 '38.09 58.0'5 3153.02 -1'6.94 5950386.18 63i2'29.56
5 10239.3 ''31.3 79.01 63.97 8934.79 3157.76 26.89 3167.64 65.33 62.97 3168.29 10.03, 595040]..45 631256155'
10 1.0268.9 29.6 76.46 61.16 8941.08 3169.49 12.66 3180.96 91.00 60.16 3182.06 35.47 595041.5.22 631281.97
11 10303.7 34.8 79.98 59.57 8948.i8 3f84'.49 11.06 3197.81 120.60 58.57 3199.42 64.77 5950432.58 631311.27
6 10330.3 26.6 85.23 60.62 8951.60' 3196.22 20.12 3210.95 143.46 59.62 3212.96 87.'40 5950446.12 631333.90
13 10364.5 34.2 90.44 59.22 8952.89 3211.51' 15.77 3228.07 173.02 58.22 3230.59 116.65 5950463.75 631363.i. 5
14 10392.1 27.6 92.46 56.94 8952.20 3224.64 11.03 3242.66 196.44 55.94 3245.59 139.81 5950478.75 631386.31
7 10431.9 39.8 92.3] 53.17 8950.54 3245.39 9.47 3265.44 229.03 52.17 3268.93 172.00 5950502.09 631418.50
16 10458.7 26.8 95.71 50.61 8948.66 3260.57 15.87 3281.93 250.06 49.61: 3285.79 192.74 5950518.95 631439.24
17 10480.1 21.4 99.84 48.50 8945.77 3273.31 21.63 3295.68 266.19 47.50 3299.81 208.63 5950532.97 631455.1'5
8 10513.4 33.3 102.04 44.63 8939.45 3294.29 13.18 3318.15 289.93 43.63 3322.70 231.97 5950555.86' 631478.47
19 10553.4 40 102.74 39.54 8930.86 3321.62 12.55 3347.13 316.10 38.54 3352.13 257.64 5950585.29 631504.14
20 10589.1 35.7 101.60 34.44 8923.33 3348.15 14.32 3375.00 337.09 33.44 3380.36 278.14 5950613.52 631524.64
9 10621.0 31.9 100.90 29.34 8917.10 3373.65 15.83 3401.56 353.61 28.34 3407.20 294.19 5950640.36 631540.69
22 10646.5 25.5 97.65 26.00 8912.99 3395.18 18.15 3423.84 365.29 25.00 3429.68 305.48 5950662.84 631551.98
23 10676.5 30 94.04 25.30 8909.94 3421.24 12.26 3450.74 378.21 24.30 3456.80 317.93 5950689.96 631564.43
10 10704.3 27.8 92.37 24.94 8908.38 3445.61 6.14 3475.87 389.99 23.94 3482.13 329.27 5950715.29 631575.77
25 10729.9 25.6 90.55 18.62 8907.73 3468.74 25.68 3499.62 399.48 17.62 3506.05 338.34 5950739.21 631584.84
26 10757.3 27.4 90.26 15.28 8907.54 3494.41 12.24 3525.83 407.46 14.28 3532.39 345.87 5950765.55 631592.37
11 10794.7 37.4 87.36 10.18 8908.31 3530.30 15.68 3562.28 415.70 9.18 3568.98 353.47 5950802.14 631599.97
28 10823.8 29.1 85.08 5.61 8910.23~ 3558.75 17.52 3591.04 419.69 4.61 3597.80 3~6.96 5950830.96 631603.46
29 10856.2 32.4 85.69 2.09 8912.84 3590.77 10.99 3623.25 421.86 i.09 3630.05 358.56 5950863.21 631605.06
Survey Meas. Course Incl. TRIIE Subsea Ve~ical Coords. - TRUE GRID Coords. - GRID Coords. - ASP
No. Depth Length Angle Az~. TVD Section N(+)/S(-) N(+)/S(-) Az~. N(¢)/S(-) N(+)/S(-i N(+)/S(') N(+)/S(-)
(R) (deg) (deg) (fl) TRUE °/100R. Lat. (Y) Dep. (X) (deg) Lat. (Y) Dep. (X) Lat. IY) Dep. (X)
12 10878.6 22.4 86.57 360.86 g914.35 3613.04 6.74 3645.59 422.43 ~'59186 3652.40' 358.75 5950885.56 631605.25!
31 10904.5 25.9 88.50 358.05 8915.47 3638,88 13.15 3671.,46 422.18 357.05 3678.26 '358.05 5950911.42 631604,55-
32 10932.0 27.5: 88.33 353,30 8916.23 3666.36 1'7.28 3698.87 420.11 352,30 3705.62 355.50 5950938.78 631602.00
13 10967.7 ''35.7 88.42 349.79 8917.24 3701.90 9.83 3734,16 4i4.8~ '348.79 3740.82 349.64 5950973.98 631596.14
........... 34' 10999,3 31,6 86,31. 345.57 89'18.69 3733.09 14.92 3764.99 408.'13 '344,57 3771.53 342.37 59510~4.69 631588.87
.... 35 11034.4 35.1 85.08 340,30 8921.33 3767.10 '15.38 3798.44 397.86 339',30 3804.79 331.52 5951037.95 631578.02
14 11'064,8 30.4 '85.08 341.00 ' 8923.94 3796.23 2.29 3827.02 387.83 340.00 3833.19 320,99 5951.066.35 631567.49
37 11095.1. 30.3' 84.29 335,38 8926,75 3824.86 18.65 3855.01 376.62 334,38 3860.99 309.30 5951094.1.5 631555.80
38 1.1145.4 50.3 85.78 333,44 8931.10 3871.29 4.85 3900.2'1 "' 354.98 '332'.44 '3905.80 .... 286.87 5951138.96 631533.37
15 11.206,7 61,3 87.01. 327.64 8934.96 3926.27 9,65 3953.45 324.90 326,64 3958.51 255.87 5951191..67 631502.37
40 11223.7 17 87.23 326.16 '8935.81 3941.03 8.79 3967,67 315.63 325.16 3972.57 24~'.'~5 5951265.73 631492.85
"41 11251.6 27,9 89,74 325,71. 8936.55 3965.04 9.1.4 3990.77 300.01 324.71 3995,39 230.33 5951228.55 631.476.83
16 11289.2 37.6 89.12 321.66 8936.92 3996.63 10.90 40'21,06 277.75 320.66 4025.29 207.54 5951258.45 631454.04
43 11337.1 47.9 86.54 316.94 8938.74 4034.74 11.22 4057.34 246.54 315,94 4061,01 175.71 5951.294.17 631422,2i
44 11379.0 41.9' 84~06 312,50 8942.17 4065.87 12.11 4086.71. 216.88 311.50 4089.87 145.54' 5951323.03 631392.04
17 11476.9 97.9 83.82 300.54 8952.55 4128.36 12.15 4144,54 138.79 299.54 4146,32 66.45 59513~9.48 631312,95
46 11.505.0 28,1 85.22 298.17 8955,23 4143.53 9.7'6 4158.25 1.14.41 297,17 4159.61 41.84 5951392.77 631288.34
47 1.1,547.1 42.1 88.59 300,04 8957.50 4166,18 9.15 4i78.70 77.69 299.04 '4179.41 4.77 5951412.57 631251..27
18 1.1563.6 16.5 90.18 303.38 8957.68 4175.69 22.42 4187.37 63.66 302.38 4187,83 -9.42 5951420.99 631237.08
49 11578.2 14.6 89.57 308,16 8957.71 4184.92 33.01 41.95.90 51..81 307.16 4196.16 -21,41 5951429.32 631225.09
.........
50 11594.2 16 89.03 306,37 8957.91 4195.37 11.68 4205.58 39.08 305.37 4205,62 -34.31 5951438,78 63121,2.19
19 11632.4 38.2 89.56 315.51 8958.38 4222.08 23,96 4230.59 10.26 '314.51 4230.12 -63.56 5951463.28 63118~i~4
52 11701.4 69 94.92 321..84 8955.68 4276.49 12.01 4282.31 -35.24 320.84 4281,04 -109.95 5951514.20 631136.55
53 11729.4 28 92.20 326.23 8953.94 4300.06 18,42 4304.93 -51.6d 325~23 4303,36 -126.75 5951536.52 631119.75
20 11.757.7 28.3 88.68 331.16 8953.72 4325.08 21.40 4329,09 -66.3~ 330.16 4327.27 -141.86 5951560.43 631104.64
55 11810,8 53.1 88.42 334.50 8955.07 4373.69 6.31 4376.31 -90.58 333,50 4374,06 -166.92 5951607.22 631079.58
56 11833.3 22.5 87.63 340,30 8955.84 4394.93 26,00 4397.06 -99.21 339.30 4394.66 -175.92 5951627.82 631070.58
21 11868.5 35.2 83.76 340.48 8958.48 4428.64 11.01 4430.12 -110.99 339.48 4427,51 -188.27 5951660.67 631058.23
58 11918.8 50.3 82.97 346.45 8964.30 4477.29 11.89 4477.99 -125.21 345.45 4475.12 -203,32 5951708.28 631043.18
59 11964.8 46 79.63 352,42 8971.26 4522.39 14.74 4522.66 -133.55 351.42 4519.64 -212.44 5951752.80 631034.06
22 11997.5 32.7 76.82 357.70 8977.94 4554.38 17.99 4554.54 -136.32 356.70 4551,47 -215.76 5951784.63 631030.74
Ii 61 12022.4 24.9 73.48 360.30, 8984.32 4578.42 16,79 4578.60 -136.74 359.30 4575.51 -216.60 5951808.67 631029.90
62 1.2057.1 34.7 68.90 355,90 8995.51 4611.23 17.84 4611.41 -137.81 354.90 4608,30 -218.25 5951841.46 631028.25
..
23 12086.7 29.6 63.98 357.20 9007.34 4638.35 17.10 4638.48 -139.45 356.20 4635.34 -220.36 5951868.50 631026.14
64 12107.1. 20.4 61.08 359.60 9016.75 4656.44 17,64 4656.57 -139.96 358.60 4653.42 -221.18 5951886.58 631025'.32
65 12130.0 22.9 57.82 2.30 9028.39 4676.10 17.48 4676.29 -139.6~ 1.30 4673.14 -221.21 5951906.30 631025.29
These surveys are correcttothe best of my
knowledge.
Jon Mapes, Coiled Tubing Coordinator
.... Baker Hug hes I NTEQ~__.~O[~ ~~~___~~
[, , I I I I
Well: P-06Ai Accept 12/8/97
Field Prudhoe Bay Spud 12/9/97
APl 50-029-22166-01 Release 12/25/97
Permit 97-224 CTD Unit Nordic #1
Date Day Depth
12~8~97 1
Move DS/N #1 from C-23a to P-06ai. Standby from 1530 hrs to 2330 hrs 12/7/97 while DS CTU
#6 finished cement plug. Electricians disconnect wellhouse electrical. Remove wellhouse.
Remove tree cap. Move rig over well. Accept rig for operation at 2330 hrs 1217/97. NU XO
spool and BOPE. Fill pits with SW. Grease swab, master, wing. Test BOPE and blinds leaked-
investigate.
1219197 2
Continue BOPE test. Witness waived by AOGCC. Replace Blind element and PT to 4000/250
psi. RU WL. Open well. WHP = 400 psi. Bleed down to 37 psi. SWI and pressure increased to
320 psi in 38 minutes. Called DS and squeeze sample was still liquid at T = 24 hfs (no
compressive strength). RU WL and TIH to tag. Tagged at 10072', (22' above peris), POOH with
WL (WHP = 400 psi). PT wellbore to 1500 psi. lost 50 psi in 2 min. Bleed pressure off to zero.
%" stream flowing. SWI and PT to 1000 psi. lost 70 psi in 60 minutes. PT and tag was approved
by AOGCC. Hold press while WO on Eline equipment. Pressure bled to 740 psi in 6 hours.
Bleed off and monitor-stable. RU SWS E-line with 20' lubricator and packoff. MU Baker
Permanent whipstock. Safety meeting. RIH with whipstock. Spend considerable time getting
acceptable orientation. Set WS with top at 10040', bottom at 10052' at 5.6° R. POOH. RD SWS.
12/9/97 3 10055
Finish RD SWS. Load CT with water and PU BHA#1, TIH. Tagged SWN nipple, Corrected +2.5'.
Milled SWN, TIH tagged top of WS at 10040'. Milled window from 10039' to 10045' CTM. Outside.
Backed reamed twice, and dry tagged, OK. POOH for run #2. OOH, change out BHA. RIH with
BHA #2 (string reamer and undergauge bit). Ream thru XN nipple until clean. Dress window until
clean. Drill 6' of formation to 10055'. Displace seawater in wellbore to 9.1 ppg used FIo Pro mud.
POOH for drilling BHA. LD mill and string reamer. MU drilling BHA. Install new CTC. RIH with
drilling BHA #3 (2.6 deg motor).
12/10197 4
Finish RD SWS. Load CT with water and PU BHA#1, TIH. Tagged SWN nipple, Corrected +2.5'.
Milled SWN, TIH tagged top of WS at 10040'. Milled window from 10039' to 10045' CTM. Outside.
Backed reamed twice, and dry tagged, OK. POOH for run #2. OOH, change out BHA. RIH with
BHA #2 (string reamer and undergauge bit). Ream thru XN nipple until clean. Dress window until
clean. Drill 6' of formation to 10055'. Displace seawater in wellbore to 9.1 ppg used FIo Pro mud.
POOH for drilling BHA. LD mill and string reamer. MU drilling BHA. Install new CTC. RIH with
drilling BHA #3 (2.6 deg motor).
12/11/97 5 10425
RIH with BHA #3. Tagged SWN at 9732'. Worked through. TIH and orient TF to HS. Drilleing.
Orient TF, Drilling, hard to get through window with BHA.. At 10090', ~ of BHA out in open hole,
ROP at 80 fph. Drilled to 10220' and orient TF to Left side. Magnetic interference is creating
problems with the G totals and Boxy (magnetic interference). Drilled to 10230' and was unable to
get 90L TF. POOH to change bend and inspect directional package. Phaze 1. Change motor
and MWD. RIH with BHA #-4. Window is clean. Drill from 10230' dropping angle. Drill and ream
a sticky shale from 10320-400'. Get horizontal at 10364' and 8953' TVD. Drill and build on the
plan line to 10425'. Phaze 2/3. Backream to window prior to POOH for temp log.
12/12/97 6 1066
Backream to window. Tie-in at 10000' Corrected +19'. Orient TF and TIH and tagged bottom at
10441' POOH. To run Memory tools. Change out BHA. TIH. Stopped at 9900' TIH and logged
OH at 40FPM to 110435'. Stopped. Logged up at 40 FPM to 9900'. Stopped. POOH. RD BHA
and downloaded memory tools. Data "Good". PU Drilling BHA. TIH and tie-in at 9970'. Drilled to
10603'. Stuck pipe at 10593 and worked free. Wiper trip to window. Drilling at 10663'.
12/13/97 7 11220
Drilling, Orient and drilling. Mud Swap. Wiper trip at 10742' Drilling. Broke over to the tanget at
10730' MD (TVD = 8907') Drilling. Wiper trip at 10876' to window. Drilled to 10897' PUH to
switch MP and Tie-In inside 5.5" casing. Corrected (+20") RIH, tagged at 10100' and 10125'.
Worked through. TIH. Up 3000# extra drag in the inverted ramp.. Orient TF, Drilling. Drilled to
10969', lost packing on MP#2. Hole getting sticky at due to mud differential. NE(MP's) time
started at 1730 hrs. PUH to window. Sticky at 10760' to 10650' ,10k over, (Turn down section of
hole). Return both mud pumps to operational status. NE ended 2030 hrs. Ream in hole. Ream
thru 10110-26', 10200', 10362'. Spent 1.5 hrs reaming 10700-800' with several 20K over pulls.
Drill from 10969-11100'. Backream to 10300'-considerable improvement. Drill from 11100-11220'
12114/97 8 11652
Drilled to 11243', Wiper trip to window. Tight from 10760' to 10696'. (10k over). Pulled to 9960'
and Tie-In. (+17' correction), Orient TF and RIH. Tagged several times from 10113' to 10143'
(9R). RIH, worked through 10700 to 10856' Tagged bottom, drilling. ROP slow, Bit trip. Change
Out BHA. TIH, Tie-in and no correction. Orient TF and RIH. Ream tite hole 10100-140' and
spend 40 minutes getting by 10770'. RIH. Drill from 11350-500'. Backream (clean) to window.
Tie-in in liner, add 11.0'. RIH clean to corrected TD. Drill from 11505-11652' while turning right to
bullseye target. Short trip.
12/15/97 9 11925
Finish short trip to 10300'. TIH and tagged at 10700'. W/R from 10700' to 10800' in 30 minutes.
RIH. Tagged bottom at 11652'. Drilling. Tagged bottom at 11652' Drilled to 11680' Started having
trouble with TF. Oriented TF and acted like its faulted. Beat ourway through to 11700'. ROP on
the other side is +100 FPH, No fluid lose at this time. Orient TF. Drilling. Drilled to 11775', Losing
4 to 5 BPH of mud. Wiper Trip to window. 70k at 11038', Pulled 2 to 10k lb. over CT weight from
10824' to 10675',(@ 10 ft intervals). Smooth from 10675' to 10300'. TIH. Tagged at 10687' and
10734'. Good trip in. Tagged bottom. Orient TF and back to drilling. Taking 3000 to 10,000#WOB
to get bit to drill. Drill from 11775-925' (with no mud losses). Short trip to window. Spent 55 min
getting by 11727' and 45 min getting by 10680'. The rest of hole is clean. Park at window to tie-in
and MWD quit. POOH for MWD at 2330 hrs (NE). Change MWD, bit and CTC. RIH with BHA
#8. Tie-in at 0500 hrs (OE). Add2.0'. RIH.
12/16/97 10 12130
Continue RIH after trip. Tagged 10765',11067'.11325, 11606'. 11633' (1 hrs to get through) Clean
below 11700' RIH and tagged bottom. Orient TF, Drilling. Having trouble sliding. Taking 10,000
to 15000# (WOB) to get any ROP. At 12020' MD, started new mud swap. Making wiper trips to
11900' New Mud in OH. Sliding good. Drilled to 12090' Wiper trip to window to Tie-In prior to TD
at 12130' MD. Tie-In. Lost GR signal. NE time started at 1730hrs POOH for MWD. Change
MWD. RIH with BHA #9. Tie-in at 9970' at 22:00 hrs (OE). Ream in hole. Set down and work
thru 10727', 10775'. Took 70 min to get thru 11080' and backream clean. RIH to TD. Drill to
12130' which is uncorrected TD of well. Attempt to get survey w/o success. GR is shot too.
TF is working. NE starts at 0345 hrs. Backream to window.
12/17~97 11 12130
Backed reamed to 10070'. RIH and tagged at 10732' Orient TF and worked through. Took 1 hr to
get through 10732' MD with 90L TF. This area is getting progressively worst with wiper trips. RIH
to clean out to bottom. Tie in at 11854' (+11') RIH and tagged at 12130' (Hard). POOH for logs.
OOH, Backed flushed 4 bbl methanol in CT. RD BDH. Sperry on standby at 1430hfs and
Baker INTEQ released at 1430 hrs. ND BOP and move rig off well. RU well house and Chuck
"Shack". Hold Safety and Operational Meeting. RU CTE Unit. RIH w/CT E-line tools. Tools
stopped at 10,115'. Unable to work tools deeper. POOH.
12/18~97 12
POOH with Eline CTE. Called town and decided to RD CTE. RD CTE and remove well house
and Shack. MIRU CTD Unit. DS/Nordic back on clock at 13:30 hrs. NU & PT BOP. BOP test
wavered by AOGCC. Unable to PT BOP, ice in rig piping near cellar. Thaw lines, test BOP. PU
BHA, TIH. GR log for correlation. Re-log section 10050'-10125'. Wash and ream in hole. Hole
rough and sticky 10710' - 10800'. Continue wash and ream in hole.
12/19~97 13
Orient TF to 97R, Wash and reamed through 11670'. RIH a logged down from 1207' to PTD at
100 FPH. Drilled from 12125' to 11130' Logged and surveyed from 12070 to 12130'. POOH.
Tensional doleg at 11144' to 11124' Worked through. Worked through 10724' to 10650' Above
10600' clean to window. Tie-in at 9959' Made+25' correction. POOH. LD BHA, held Safety
meeting. PU float equipment and liner. TIH and corrected to flag at 7000' (-20'). TIH and tagged
at 10084' Worked through. Pushed liner. Tagged several spots from 10084' to 10700'. Took 1
1/2 hrs to work by 10700', pushed liner and worked thru several tight spots 10700' to 11794'.
Liner running tools dis-connected from liner at 11794' while attempting to work thru tight spot.
POOH for fishing tools
12/20197 14
POOH with CTLRT. LD BHA and wait on fishing tools. Unload DC, hold safety meeting. PU 20 3
1/8" '1 ¼" DC and fishing tools. RIH, Wt check at 43k. Tagged the top offish at 9661' Broke
circulation. PU liner, free. Circulate wellbore clean and work liner. Work liner to bottom. Circulate
bottoms up. POOH, LD DC and fishing tools. PU Baker CTLRT, TIH.
12/2t/97 15
RIH with cement stinger. Tagged at 9739' (inside TT). PUH, 41k, Established circulating rates.
Unable to get below 9741' (SWN Nipple). POOH to PU 2 jts 2 3/8" RTS tubing. OOH and change
out BHA, added 2 its 2 3/8" RTS6. RIH. Tagged the top of the Deployment sub at 10008' Stung
in. Broke cir. Placed 11,000# on Iocator sub. Turn hole over to KCL. Losing 40% to 50% returns
at all cir rates. Turn hole over to KCL. With 160 bbl pumped Q is 1:1 at 1.5 BPM. Pump 19.5 Bbl.
Cement. Pressure building up and breaking back during cement job. Losing 15%-75% returns
periodically during cement job. Bump liner wiper plug at correct displacement. Circulate bottoms
up, no cement returns to surface. POOH. LD CTLRT. PU nozzle and 1 ¼" CS Hydril. TIH to clean
out liner
12122197 16
At 0730, Compressive strength are at 1986 psi. PT liner lap to 1000 psi and in 6 min Pressure at
773 psi. Re-tested and Iossing pressure at same rate. Cir. CT and WOC. At 1000 hrs Pcmt =
+2300 psi. PT liner lap. PT to 1030 psi and 10 min the the P = 1017 psi. Small leak. RIH washing
out liner. Wt check every 500'. Ta¢l¢led at 12028' MD (8984' TVDss). Perfs ( i~ro|ected I~erf
interval.10950' to 11900' ) Unable to wash out. Could be on bottom with CTD Eline correction.
Circulated hole clean. Called town. Turn liner over to 150k LSRV FIo-Pro. PUH laying FIo-Pro.
Displaced top of liner with FSW. PT the liner lap to 2500 psi. At 0.75 BPM. The pressure dropped
from 2150 psi to 1700psi quickly. Cir well and wait on cement trucks. Pump 3.5 Bbl squeeze
cement. With 1 Bbl cement out nozzle, pull up hole at 45 fpm while pumping 1.0 bpm. Pull above
cement top and begin to ramp pressure up with walking squeeze. Pressure ramped to 1625 psi.
Shut down pump, close choke. Pressure stable. Release pressure and wash in hole
contaminating cement. Wash 100' down inside liner. Circulate out cement. Estimate 1.5 Bbl.
Cement in returns to surface. POOH. Stand back and SLM 1 ¼" CS Hydril. Found error in
electronic depth counter (+45'). WOC to test liner top squeeze.
12123197 17
WOC .DS Lab results at 1900 psi (150F) 10 Hrs. PT liner lap. Stabbed on well with Injector head.
PT to 2000 psi, lost 400 psi in 4 minutes, re-tested and and pressure loss was the same. PT to
1000 psi and lost 250 psi in 8 min. This is the same pressure loss as before the liner cmt
squeeze. Cir and warm up CT. Ambient T =-48F at Chill Factor ~.. -85F. Change out Blind
Rubber. PT to 250/4000 psi. Re-tested wellbore. Same results. Wait on Baker tools to PT the
liner internally. PU BHA. TIH. Stag into liner and test internally to 3000 psi-Held OK. Pull out of
liner and test liner lap. Pump in 0.85 BPM @ 2500 psi. POOH. Run in hole with squeeze nozzle.
Spot cement, pull above. Close choke, pump in 2.3 Bbl. Pressure went to 3000 psi. Open choke
and begin circulating. Ramp pressure up using choke. Pressure ramped to 3120 psi. Had several
pressure breaks while ramping. Shut down pump, close choke. Pressure stable at 2875 psi. Wash
in hole contaminating cement, holding 1000 psi back pressure while washing. POOH. Holding
500-600 psi back pressure. WOC for liner top test.
12/24/97 18
WOC on 2'd Liner Lap Squeeze. Press tested liner lap to 2500 PSI, OK. Pick up SWS I 11/16"
perf guns loaded at 4 SPF. RIH on 32 stands of CSH workstring. Change out well / rig pits to
FIoPro. Tag PBTD of 12,063 ft at 12,032 ft CTD, correct CTD and position bottom shot at 11,900
ft. Pump 0.5" steel ball, ball on seat at 48.9 BBLS. Firing head sheared at 4300 PSI. POOH.
Held safety meeting. Lay out SWS guns, All shots fired, Perforated 11,812 - 11,900 ft BKB.
RIH with second set of perf guns [128.43 ft]. RIH on same 32 stds of CSH workstring. RIH with
CT. Tag PBTD of 12,063 ft at 12,037 ft. Correct CTD. Position bottom shot at 11480 ft. Charges
set at 11,480 - 11,460 ft and 11,440 - 11,370 ft BKB. Pump 0.50" steel ball.
12/25/97 19
Ball on seat at 51.1 BBLS. SWS Firing head sheared at 4500 PSI. POOH. LD guns. All shots
fired. Perforated interval 11,369'-11,440' and 11,460-11,480' BKB. PU guns for perf run #3.
Position guns and drop ball. All on seat and sheared at 4100 psi. POOH displacing hole above
liner top w.2% KCL water. Recover perf guns,-All shots fired. Perforated interval 10,950 -
10,990' and 11,010 - 11,050'. RIH with CT and freeze protect 4 ~" tubing with MEOH. POOH.
Clean pits. N/D BOPE. Prep to move rig.
WELL LOG TRANSMITTAL
To: State of Alaska
Alaska Oil and Gas Conservation Comm.
Attn.' Lori Taylor
3001 Porcupine Dr.
Anchorage, Alaska 99501
MWD Formation Evaluation Logs
January 21. 1998
The technical dam listed below is being submitted herewith. Please acknowledge receipt by
returning a signed copy of this transmittal letter to the attention of:
Jim Galvin, Sperry-Sun Drilling Services. 5631 Silverado Way, #G, Anchorage, AK 99518
1 LDWG formatted Disc with verification listing.
API#: 50-029-22166-01.
5631 Silverado Way, Suite G · Anchorage, Alaska 99518 · (907) 563-3256 · Fax (907) 563-7252
A Dresser Industries, Inc. Company
WELL LOG TRANSMITTAL
To:
State of Alaska
Alaska Oil and Gas Conservation Comm.
Attn.' Lori Taylor
3001 Porcupine Drive
Anchorage, Alaska 99501
MWD Formation Evaluation Logs P-06A,
January21, 1998
The technical data listed below is being submitted herewith. Please acknowledge receipt by
returning a signed copy of this of this transmittal letter to the attention of:
Jim Galvin. Sperry-Sun Drilling Services, 5631 Silverado Way, #G, Anchorage, AK 99518
P-06A:
2" x 5" MD Gamma Ray Logs:
50-029-22166-01
2" x 5" TVD Gamma Ray Logs'
50-029-22166-01
1 Blueline
1 Rev Folded Sepia
1 Blueline
1 Rev Folded Sepia
5631 Silverado Way, Suite G · Anchorage, Alaska 99518 · (907) 563-3256 · Fax (907) 563-7252
A Dresser Industries, Inc. Company
TONY KNOWLE$, GOVERNOR
3001 PORCUPINE DRIVE
ANCHORAGE, ALASKA 99501-3i 92
PHONE: (907) 279-.1433
FAX: (907) 276-7542'
December 8, 1997
Ted Stagg
Coil Tubing Drilling Engineer
BP Exploration (Alaska) Inc'.
? O Box 196612 -'
..
Anchorage, AK 99519-6612
Re: TL_I LI__:_Z~ L~.;-5~
__
BP Exploration (Alaska) Inc.
Permit No: 97-224
Sur. Loc.: 2506'NSL, 1963'EWL, Sec. 31, TllN, R13E, UM
Btmhole Loc: 1926'NSL, 1849'EWL, Sec. 30, TllN, R13E, UM
Dear Mr. Stagg:
Enclosed is the approved application for permit to redrill the above referenced well.
The permit to redrill does not exempt you from obtaining additional permits required by law from
other governmental agencies, and does not authorize conducting drilling operations until all other
required permitting determinations are made.
The blowout prevention equipment (BOPE) must be tested in accordance with 20 AAC 25.035;
and the mechanical integrity (MI) of the injection wells must be demonstrated under 20 AAC
25.412 and 20 25.030(g)(3). Sufficient notice (approximately 24 hours) of the MI test before
operation, and of the BOPE test performed before drilling below- the surface casing shoe, must be
given so that a representative of the Commission may witness the tests. Notice may be given by
inspector on the North Slope pager at 659-3607.
David W. J'Shmmu'_ \ ~
Chairman ~.~
BY ORDER OF THE COMMISSION
dlffenclosures
cc: Department of Fish & Game, Habitat Section w/o encl.
Department of Environmentalt Conservation w/o encl.
STATE OF ALASKA
ALASh_ . .)IL AND GAS CONSERVATION COMf
APPLICATION FOR SUNDRY APPROVAL;.-'
31ON
1. Type of Request: ~ Abandon '~. Change Approved Program L_~ Repair Well Z Plugging ~ Re-Enter Suspended Well ~ Vadance ~-~ Pe
~ Alter Casing ~'~ Suspend [~ Operation Shutdown -- Pull Tubing ~ Time Extension ~ Stimulate ~ Ot
~-~ ~ -- Plug Back for Sidetrack --
2. Name of Operator
BP Exploration (Alaska) Inc.
3. Address
P. O. Box 196612, Anchorage, Alaska 99519-6612
4. Location of well at surface
2506' NSL, 1963' EWL, SEC. 31, T11 N, R13E
At top of productive interval
203' NSL, 1923'EWL, Sec.30, T11N, R13E
At effective depth
4803' NSL, 3000' EWL, SEC. 30, T11N, R13E
At total depth
529' NSL, 2012' EWL, SEC. 30, TllN, R13E
Type of well: ~ Development
~ Exploratory
~ Stratigraphic
6. Datum Elevation (DF or KB)
KBE=92.11
7. Unit or Property Name
Prudhoe Bay Unit
8. Well Number
P-06i
9. Permit Number
91-61
i10. APl Number
50-029-22166
11. Field and Pool
Prudhoe Bay Field / Prudhoe Bay
Pool
12. Present well condition summary
Total depth: measured 10470' feet Plugs (measured)
true vertical 9275' feet
Effective depth: measured 10386' feet Junk (measured)
true vertical 9212' feet
Casing Length Size Cemented
Structural
Conductor 120' 20"
Surface 2650' 10-3/4" 2939 C.F. Permafrost
Intermediate 9930' 7-5/8" 1461 cu ft Class G
Production
Liner 9739' 5-1/2" 165 cuft class G
MD TVD
147 147
2687 2678
9967 8893
9739'-10470' 8728'-9275'
Perforation depth: measured subsea8896'-8920' 8927'-8957'
true vertical subsea8896'-8920' 8927'-8957'
Tubing (size, grade, and measured depth) 4-1/2" 12.6# NT13CR-80
Packers and SSSV (type and measured depth) Packer @9677 SSSV @2109
RECEIVED
Alas~ 0il & 6as Coas. Commission
Anchorage
13. Attachments ~ Description summary of proposal [-3 Detailed operations program E~ BOP sketch
14. Estimated date for commencing operation
12/3/97
16. If proposal was verbally approved
Name of approver Date approved
Contact Engineer Name/Number: Ted Stagg 564-4694
15. Status of well classifications as:
[-'-J Oil (--] Gas [~ Suspended
Service Water Injection
Prepared By Name/Number: Theresa Mills 564-5894
17.1Signedhereby ce~~ true and correct to theTitlebeSt of¢ '7'~ (L72.~mY knowledge '~ ~-' ~ Commission Use Only
Date
Conditions of Approval: Notify Commission so representative may witness
Plug integrity __ BOP Test __ Location clearance __
Mechanical Integrity Test __
Subsequent form required 10-
Approved by order of the Commission
lAppr°val Noc~??'~¢2/9
Commissioner
Date 1/'~,..~ ~
Form 10-403 Rev. 06/15/88 Submit In Triplicate
BPX
P-06ai Sidetrack
Summary of Operations:
This sidetrack is designed to improve injection conformance by abandoning the existing injection
interval and completing a new injection interval in Zone 4.
This sidetrack will be conducted in two phases.
Phase 1: Abandon existing perfs and set whipstock: Planned for 1213/97.
- The existing perforations will be abandoned with cement containing 20 ppb aggregate. After
underreaming, the cement will be pressure tested and tagged with AOGCC witness.
- A whipstock will be set on E-Line at approx. 10,040' MD.
Phase 2: Drill Directional Hole: Planned for 12110197.
- Directional drilling coil tubing equipment will be rigged up and utilized to mill the window
and drill the directional hole as per attached plan to planned TD of 11,971' MD (8,960'
TVDss).
Mud Program:
-Phase 1: Seawater
- Phase 2: FIo-Pro (8.8 - 8.9 ppg)
Casing Program:
- 2 7/8", 6.16#, L-80, ST-L liner will be run from TD to approx. 10,000' MD and cemented with
approx. 20 bbls. cement. This will place the top of the 2 7/8" liner within the existing 5 %"
liner. The well will then be perforated with coil tubing conveyed guns. The depth of the top of
the cemented 2 7/8" liner is planned to allow for a future Sag R. sidetrack.
Well Control: - BOP diagram is attached.
- Pipe rams, blind rams and the CT pack off will be pressure tested to 400 psi and to 4000 psi.
- The annular preventer will be tested to 400 psi and 2000 psi.
Directional - See attachments.
- Kick Off: 10,051' MD (8,864' TVD ss)
- TD: 11,971' MD (8,960' TVD ss)
- Magnetic and inclination surveys will be taken every 30 ft. No gyro will be run.
Logging - A Gamma Ray log will be run over all of the open hole section.
- CTE-Line will be used to run GR/Induction logs at TD.
.- ..... STATE OF ALASKA
ALASKA _ AND GAS CONSERVATION CC /IlSSION
PERMIT TO DRILL CT Sidetrack well
20 AAC 25.005
[] Drill [] Redrill Ilb. Type of well [] Exploratory [] Stratigraphic Test [] Development Oil
la. Type of work BI Re-Entry E] Deepenl [] Service [] Development Gas I-'1 Single Zone [] Multiple Zone
2. Name of Operator ~. Datum Elevation (DF or KB) 10. Field and Pool
BP Exploration (Alaska) Inc. KBE=92.11 Prudhoe Bay Field / Prudhoe
3. Address 6. Property Designation Bay Pool
P. O. Box 196612, Anchorage, Alaska 99519-6612 ADL 028288
4. Location of well at surface 7. Unit or Property Name 11. Type Bond (See 20 AAC 25.025)
2506' NSL, 1963' EWL, SEC. 31, T11 N, R13E Prudhoe Bay Unit
At top of productive interval 8. Well Number Number 2S100302630-277
203' NSL, 1923'EWL, Sec.30, T11 N, R13E P-06Ai
At total depth 9. Approximate spud date Amount $200,000.00
1926' NSL, 1849' EWL, Sec.30, T11N, R13E 12/10/97
12. Distance to nearest property line 113. Distance to nearest well 14. Number of acres in property 15. Proposed depth (MD and TVD)
ADL 028264 @ 1849'I no close approach 2560 11,971; 8,960'TVD
16. To be completed for deviated wells 17. Anticipated pressure {see 20 AAC 25.035 (e) (2)}
Kick Off Depth 10,051 Maximum Hole Angle 95° Maximum surface 3300 psig, At total depth (TVD) 3708@8800' psig
18. Casing Program Specifications Setting Depth
Size Top Bottom Quantity of Cement
Hole Casing Weight Grade Coupling Length MD TVD MD TVD (include stage data)
3 3/4" 2 7/8" 6.16# L-80 ST-L 1971 10,000 8831 11,971 8960 113 c.f.
19. To be completed for Redrill, Re-entry, and Deepen uperauons. ~ ~-'~ ~\¢..~\~
Present well condition summary,,,~~~i\ RI G INA L
Total depth: measured 10470' feet Plugs (measured)
true vertical 9275' feet
Effective depth: measured 10386' feet Junk (measured~'¢'''
true vertical 9212' feet
Casing Length Size Cemented MD TVD
Structural
Conductor 120' 20" 147 147
Surface 2650' 10-3/4" 2939 C.F. Permafrost 2687 2678
Intermediate 9930' 7-5/8" 1461 cu ft Class G 9967 8893
Production
Liner 9739' 5-1/2" 165 cu ft class G 9739'-10470' 8728'-9275'
Perforation depth: measured subsea8896'-8920' 8927'-8957'
true vertical subsea8896'-8920' 8927'-8957'
20. Attachments [] Filing Fee [] Drilling Fluid Program [] Property Plat []Time vs Depth Pict [] BOP Sketch [] Refraction Analysis []
Contact Engineer Name/Number: Ted Stagg 564-4694 Prepared By Name/Number: Theresa Mills 564-5894
21. I hereby certify th//~g is true and correct to the best of my knowledge
Signed ¢"_ ~,~. ..... /--' /
,,~.,/~¢~¢ ~'~, ~/-'-f~'¢',¢' Title ¢7" ~,,~. ~___~/. Date // '/~ 7
Commission Use Only
Permit Number I APl Number I ApprovalDate I See cover letter
/~;~.~- Z...~- ~ 50- 0 2.. '=~ -.--- :2. ~_ / ~'~"-- ~ / /~, -~ ~ ---- ~'"~ for other requirements
Conditions of Approval: Samples Required [] Yes ~ No Mud Log Required [] Ye~ No
Hydrogen Sulfide Measures [] Yes
No [] []~_,=,,~,,[] [] []
Required Working Pressure for BOPE 2M; ~_,..~i ' 5M; by or(~e0r~ 15M
Approved By Commissioner the commission Date
Form 10-401 Rev. 12-01-85 Submit In Triplicate
TREE: 4-1/16"-5M ClW
WELLHEAD: 11" - 5M FMC
ACTUATOR: OTIS
, ..~-06A Proposed Completio=
KB. ELEV =92.11'
BF. ELEV =55.41'
SSSV LANDING NIPPLE I I
(0TIS)(3.813" ID) 2103'
CMT'd
10 3/4",
45.5#/ft, 12687' I
NT-80 BTRS
KOP: 4800'
MAX ANGLE: 44° @ 9600'
GAS LIFT MANDRELS
(CAIvlCO W/1" BK LATCH/
No MD(BKB) TVDss Ang
5 2985' 2893' 0°
4 5514' 5389' 24°
3 7729' 7133' 39°
2 9267' 8297' 43°
1 9636' 8565' 44°
4 1/2", 12.6~/ft, 13CR,
TDS CHROME TUBING
TUBING ID: 3.958"
CAPACITY: 0.0152 BBL/FT
NOTE'
13 Chrome tubing and
Liner!!!!!
TOP OF TIW I 9739'
5 1/2" LINER
7 5/8", 29.7#/ft, I
NT-95HS NSCC 9966'
2 7/8 Liner Top approx. 10,000'
4 1/2 .... SWS" NIPPLE
(PARKER) (3.813" ID)
19664'
19675'
19677'
Right-hand release
latch
7 5/8" TIW PACKER
(HB-BP) (4.00" ID)
4 1/2", 12.6#/ft, 13Cr TAILPIPE
4 1/2 .... SWS" NIPPLE
(PARKER) (3.813" ID)
4 1/2 .... SWN" NIPPLE
(PARKER) (3.725" ID)
I sw, -- 9,732' ELMD I
4 1/2" WLEG (Parker)
19709'
I 9731'
19743'
space below 7 518" shoe
for future whipstock
Whipstock approx. 10,040'
P&A Cement
PERFORATION SUMMARY
REF LOG' ATLAS - BHCA (5-19-91)
TIE-IN LOG: ATLAS - GR/CCL (6-9-11)
3 3/8'1 6 110094-10124'
33/8"1 4 110134-10173'
33/8"14 11017S - 10206'
PBTD ~
5-1/2", 17 #Iff, 13Cr, FL4S [ 10:470'1
P-06
5,000
4,500
3,500
l ..... 22'500000 .
I ........................... t t , ............ I I
- 1,500 - 1,000 -500 0 500 1,000
X distance from Sfc Loc
IWell Name P-06 I
CLOSURE
Distance 3,952 ft I
Az 1 deg
I
NEW HOLE
E/W (X) N/S (Y)
Kick Off -98' 3,047
TD 90 3,951
State Plane 631,336 5,951,184
Surface Loc 631,246 5,947,233
DLS
deg/100 Tool Face Length
Curve 1 1 0 32
Curve 2 34 35 194
Curve 3 14 -90 739
Curve 4 7 180 136
Curve 5 5 90 819
1,920
Drawn: 11/18/97
16:28
Plan Name: Case 1401
p'06 Vertical Section Path Distance (Feet)
0 ~00 ~,000 ~,~00 ~,000 ~,~00 ~,000 ~,~00
TSGR ...................
i TSHU ........
8800 ]~,~-7 5/8s, - - ,.7 5]8';-sh0e 9966 MD'
~85o
'1;,, Angle @ K.O.= 41 deg
~ /ATS /,ll,~lI~, MD:10051
8900
8950
Tot Drld:1920 ft
9000
Marker Depths ~Orig Wellbore
TSAD
HOT
7 518 shoe
TSHU
Kick Off
8,886Jrt TVD
8,8001, TV~
8,7951ft TVD
Deprtr @KO
8,8641ft 'I'VD
10,051 Iff MD
3,063 ft
MD KO Pt
MD New Hole
Total MD
10,051
1920
11,971
8,96o
TVD TD
DLS
deg/100
Curve 1 1
Curve 2 34
Curve 3 14
Curve 4 7
Curve 5 5
Tool Face Length
0 32
35 194
-90 739
180 136
90 819
1,920
Drawn: 11/18/97
16:28
Plan Name: Case 1401
~P-06ai
CT Drilling & Completion BOP
2 3/8" CT ~
i
Lubricator~ !
U.I
12"
36"
22.5"
7 1/16"
Annular
7 1/16" 5000 psi
Blind/Shear
7 1/16"
Pipe/Slip 2 318"
I, ..., .... ~1
7 1/16"x 5.000 psi
7 1116"
Pipe ~ 2 3/8"
SWAB OR MASTER VALVE
I
WELL PERMIT CHECKLIST COMPANY
iNiT CLASS
FIELD & POOL
ADMINISTRATION
WELL NAME
GEOL AREA
N
PROGRAM: exp [] dev [] redrlT~serv~wellbore seg f_: ann. disposal para req
UNIT# //,~-~.,¢'C'J-" / ON/OFF SHORE
ENGINEERING
1. Permit fee attached .......................
2. Lease number appropriate ...................
3. Unique well name and number ..................
4. Well located in a defined pool ..................
5. Well located proper distance from drilling unit boundary ....
6. Well located proper distance from other wells ..........
7. Sufficient acreage available in drilling unit ............
8. If deviated, is wellbore plat included ...............
9. Operator only affected party ...................
10. Operator has appropriate bond in force .............
11. Permit can be issued without conservation order ........
12. Permit can be issued without administrative approval ......
13. Can permit be approved before 15-day wait ...........
APP, R/ DAT~
GEOLOGY
14. Conductor string provided ................... Y N ") , ,,~ _
15. Surface casing protects all known USDWs ........... Y N
16. CMT vol adequate to circulate on conductor & surf csg ..... Y N (
17. CMT vol adequate to tie-in long string to surf csg ........ Y N
18. CMT will cover all known productive horizons .......... (~ N
19. Casing designs adequate for C. T, B & permafrost ....... ~ N
20. Adequate tankage or reserve pit ................. N
21. If a re-drill, has a 10-403 for abandonment been approved... N
22. Adequate wellbore separation proposed ............. C~ N ,,/~,._ '
23. If diverter required, does it meet regulations ..........
24. Drilling fluid program schematic & equip list adequate ..... ~) N
25. BOPEs, do they meet regulation ..... ~ N
26. BOPE press rating appropriate; test to "~ ~ .'......' Psigl ~ N
27. Choke manifold complies w/APl RP-53 (May 84) ........ (~ N
28. Work will occur without operation shutdown ...........
29. Is presence of H2S gas probable ................. ~ N
30. Permit can be issued w/o hydrogen sulfide measures ..... Y N
31. Data presented on potential overpressure zones .......
32. Seismic analysis of shallow gas zones .............
33. Seabed condition survey (if off-shore) .............
34. Contact name/phone for we,ekly,progress repo, rts /Y N
lexp~oratory omyl .....
REMARKS
GEOLOGY: ENGINEERING: COMMISSION'
BEW
-., RNC~
CO (' ;O
Commentsllnstructions:
HOW/lit - A \FORMS\chekhst rev 09/9?
Well History File
APPENDIX
Information of detailed nature that is not
particularly germane to the Well Permitting Process
but is part of the history file.
To improve the readability of the Well History file and to
simplify finding information, information of this
nature is accumulated at the end of the file under APPENDIX.
No special effort has been made to chronologically
organize this category of information.
* ALASKA COMPUTING CENTER *
******************************
* ....... SCHLUMBERGER ....... *
COMPANY NAM~ : BP EXPLORATION (ALASKA)
WELL NAME : P-O6A
FIELD NAFiE : PRUDHOE BAY
BOROUGH : NORTH SLOPE
STATE : ALASKA
API NUlV~ER : 500292216601
REFERENCE NO : 98148
M CROFILN I D
Date.~-~~
LIS Tape Verification Listing
Schlumberger Alaska Computing Center
14-0CT-1998 16:53
PAGE:
**** REEL HEADER ****
SERVICE NAME : EDIT
DATE : 98/10/14
ORIGIN : FLIC
REEL NAME : 98148
CONTINUATION # :
PREVIOUS REEL :
COMPIENT : BP EXPLORATION, P-O6A, PRUDHOE BAY, API #50-029-22166-01
**** TAPE HEADER ****
SERVICE NAME : EDIT
DATE : 98/10/14
ORIGIN : FLIC
TAPE NAME : 98148
CONTINUATION # : 1
PREVIOUS TAPE :
COMSDENT : BP EXPLORATION, P-O6A, PRUDHOE BAY, API #50-029-22166-01
TAPE HEADER
PRUDHOE BAY
OPEN HOLE WIRELINE LOGS
WELL NAME:
API NUMBER:
OPERATOR:
LOGGING COMPANY:
TAPE CREATION DATE:
JOB DATA
JOB NUMBER:
LOGGING ENGINEER:
OPERATOR WITNESS:
SURFACE LOCATION
SECTION:
RUN1
98148
S MORRISON
S BUNDY
TOWNSHIP:
RANGE:
FNL:
FSL:
FEL:
FWL:
ELEVATION(FT FROM MSL O)
KELLY BUSHING:
DERRICK FLOOR:
GROUND LEVEL:
WELL CASING RECORD
1ST STRING
2NDSTRING
P-O6A
500292216601
BP EXPLORATION (ALASKA)
SCHLUMBERGER WELL SERVICES
13-0CT-98
RUN 2 RUN 3
..........
31
liN
13E
2506
1963
92.10
53.80
OPEN HOLE CASING DRILLERS
BIT SIZE (IN) SIZE (IN) DEPTH (FT)
3.750 4.500 10041.5
LIS Tape Verification Listing
Schlumberger Alaska Computing Center
14-0CT-1998 16:53
3RD STRING
PRODUCTION STRING
CONTAINED HEREIN IS THE LDWG FORMATTED OPEN HOLE SLIM
ACCESS AIT DATA AQUIRED ON BP EXPLORATION'S P-O6A WELL.
$
$
PAGE:
**** FILE HEADER ****
FILE NAME : EDIT .001
SERVICE : FLIC
VERSION : O01CO1
DATE : 98/10/14
MAX REC SIZE : 8192
FILE TYPE : LO
LAST FILE :
FILE HEADER
FILE NUMBER: 1
EDITED OPEN HOLEMAIN PASS
Ail tool strings; Depth shifted and clipped curves; all runs merged; no cased hole data.
DEPTH INCREMENT: 0.5000
FILE
LDWG TOOL CODE
AIT
$
BASELINE CURVE FOR SHIFTS: GR
CURVE SHIFT DATA (~4EASUREDDEPTH)
START DEPTH STOP DEPTH
10095.0 10050.0
BASELINE DEPTH
88888.0
10088.0
10079.5
10077.0
10075.5
10069.5
100.0
$
MERGED DATA SOURCE
LDWG TOOL CODE
$
REMARKS:
.......... EQUIVALENT UNSHIFTED DEPTH ..........
AIT
88890.5
10090 5
10082 0
10079 0
10077 5
10068 0
98 5
RUN NO. PASS NO.
MERGE TOP MERGE BASE
THIS FILE CONTAINS THE EDITED OPEN HOLE SLIM ACCESS
AIT DATA. THE DEPTH SHIFTS SHOWN ABOVEREFLECT
CORRELATIONS BETWEEN THE GR AND THE P-06 ATLAS BCS
GR RAN ON 19-MAY-1991 TO CASING POINT AT 10050'.
$
LIS Tape Verification Listing
Schlumberger Alaska Computing Center
14-0CT-1998 16:53
PAGE:
LIS FORMAT DATA
** DATA FORMAT SPECIFICATION RECORD **
** SET TYPE - 64EB **
TYPE REPR CODE VALUE
1
2
3
4
5
6 73
7 65
8 68
9 65
11 66
12 68
13 66
14 65
15 66
16 66
0 66
66 0
66 0
73 36
66 1
66
0.5
FT
28
0
FT
68
1
0
** SET TYPE - CHAN **
NAME SERV UNIT SERVICE API API API API FILE NUM~ NUMB SIZE REPR PROCESS
ID ORDER # LOG TYPE CLASS MOD NUM~ SAMP ELEM CODE (HEX)
DEPT FT O0 000 O0 0 1 1 1 4 68 0000000000
GR AIT GAPI O0 000 O0 0 1 1 1 4 68 0000000000
SP AIT MV O0 000 O0 0 1 1 1 4 68 0000000000
AIBD AIT IN O0 000 O0 0 1 1 1 4 68 0000000000
AFIO AIT OHMPI O0 000 O0 0 1 1 1 4 68 0000000000
AF20 AIT OHI~IM O0 000 O0 0 1 1 1 4 68 0000000000
AF30 AIT 0H~414 O0 000 O0 0 1 1 1 4 68 0000000000
AF60 AIT 0H~4~4 O0 000 O0 0 1 1 1 4 68 0000000000
AFgO AIT OHIVlPI O0 000 O0 0 1 1 1 4 68 0000000000
** DATA **
DEPT. 10047.500 GR.AIT -999.250 SP.AIT -999.250 AIBD.AIT
AFiO.AIT -999.250 AF20.AIT -999.250 AF30.AIT -999.250 AF60.AIT
AFgO.AIT -999.250
-999.250
-999.250
· . ,
LIS Tape Verification Listing
Schlumberger Alaska Computing Center
14-0CT-1998 16:53
PAGE:
DEPT. 10045.500 GR.AIT
AFiO.AIT -999.250 AF20.AIT
AF90.AIT -999.250
-999.250 SP.AIT
-999.250 AF30.AIT
-999.250 AIBD.AIT
-999.250 AF60.AIT
-999.250
-999.250
** END OF DATA **
**** FILE TRAILER ****
FILE NAME : EDIT .001
SERVICE : FLIC
VERSION : O01CO1
DATE · 98/10/14
MAX REC SIZE : 8192
FILE TYPE : LO
LAST FILE :
**** FILE HEADER ****
FILE NAME : EDIT .002
SERVICE : FLIC
VERSION : O01CO1
DATE : 98/10/14
MAX REC SIZE : 8192
FILE TYPE : LO
LAST FILE :
FILE HEADER
FILE NUM~ER: 2
EDITED CASED HOLE MAIN PASS
Depth shifted and clipped curves for open hole logs run into casing.
PASS NUMBER: i
DEPTH INCREMENT: 0.5000
FILE SU~9~ARY
LDWG TOOL CODE START DEPTH
AIT 10050.0
$
BASELINE CURVE FOR SHIFTS: GR
CURVE SHIFT DATA (MEASURED DEPTH)
BASELINE DEPTH
..............
88888.0
10044.0
10042.0
10039.5
10032.0
10005.5
STOP DEPTH
..........
9794.0
.......... EQUIVALENT UNSHIFTED DEPTH ..........
AIT
.......
88888.0
10044.0
10041.5
10039.0
10032.0
10005.5
LIS Tape Verification Listing
Schlumberger Alaska Computing Center
14-0CT-1998 16:53
PAGE:
9999.5
9996.0
9990.5
9988.5
9983.0
9959.0
9953.5
9938.0
9935.0
9923.0
9910.5
100.0
9999.0
9996.0
9990.0
9987.5
9983.0
9959 0
9954 0
9939 0
9935 5
9923 5
9910 5
100 0
REMARKS: THIS FILE CONTAINS THE EDITED CASED HOLE SLIM ACCESS
AIT DATA. THE DEPTH SHIFTS SHOWN ABOVE REFLECT
CORRELATIONS BETWEEN THE GR AND THE P-06 ATLAS BCS
GR RAN ON 19-MAY-1991 TO CASING POINT AT 10050'.
$
LIS FORMAT DATA
** DATA FORMAT SPECIFICATION RECORD **
** SET TYPE - 64EB **
TYPE REPR CODE VALUE
1 66 0
2 66 0
3 73 8
4 66 1
5 66
6 73
7 65
8 68 0.5
9 65 FT
1i 66 128
12 68
13 66 0
14 65 FT
15 66 68
16 66 1
0 66 1
LIS Tape Verification Listing
Schlumberger Alaska Computing Center
14-0CT-1998 16:53
PAGE:
** SET TYPE - CHAN **
NAME SERV UNIT SERVICE API API API API FILE NUM~ NUF~ SIZE REPR PROCESS
ID ORDER # LOG TYPE CLASS MOD NUM~ SAMP ELEM CODE (HEX)
DEPT FT O0 000 O0 0 2 1 1 4 68 0000000000
GRCH AIT GAPI O0 000 O0 0 2 1 1 4 68 0000000000
** DATA **
DEPT. 10050.000 GRCH. AIT 55.481
DEPT. 9794.000 GRCH.AIT 66.880
** END OF DATA **
**** FILE TRAILER ****
FILE NAIVE : EDIT .002
SERVICE : FLIC
VERSION : O01CO1
DATE : 98/10/14
MAX REC SIZE : 8192
FILE TYPE : LO
LAST FILE :
**** FILE HEADER ****
FILE NAME : EDIT .003
SERVICE : FLIC
VERSION : O01CO1
DATE : 98/10/14
MAX REC SIZE : 8192
FILE TYPE : LO
LAST FILE :
FILE HEADER
FILE NUMBER 3
RAW OPEN HOLEMAIN PASS
Curves and log header data for each run and tool string in separate files; Tool String #1 fo
Sadlerochit run presented first (primary depth control string used to depth shift the Sadler
interval) followed by files for other main pass tool strings per run.
RUN NUMBER: 1
TOOL STRING NUMBER: 1
PASS NUMBER: i
DEPTH INCREMENT: 0.5000
LIS Tape Verification Listing
Schlumberger Alaska Computing Center
_. J
14-0CT-1998 16:53
PAGE:
FILE SUMMARY
VENDOR TOOL CODE START DEPTH
AIT 10098.0
$
LOG HEADER DATA
DATE LOGGED:
SOFTWARE VERSION:
TIM~ CIRCULATION ENDED:
TIME LOGGER ON BOTTOM:
TD DRILLER (FT) :
TD LOGGER (FT) :
TOP LOG INTERVAL (FT) :
BOTTOM LOG INTERVAL (FT) :
LOGGING SPEED (FPHR) :
TOOL STRING (TOP TO BOTTOM)
VENDOR TOOL CODE TOOL TYPE
GR GAM~A RAY
AIT SLIM ARRAY INDUCTION
$
BOREHOLE AND CASING DATA
OPEN HOLE BIT SIZE (IN):
DRILLERS CASING DEPTH (FT) :
LOGGERS CASING DEPTH (FT) :
BOREHOLE CONDITIONS
MUD TYPE:
MUD DENSITY (LB/G):
MUD VISCOSITY (S) :
MUD PH:
FLUID LOSS (C3):
MAXIMUM RECORDED TE~IPERATURE (DEGF):
RESISTIVITY (OI-l~) AT TEMPERATURE (DEGF):
MUD AT f4EASURED Tt~IPERATURE (MT):
MUD AT BOTTOM HOLE TEMPERATURE (BHT):
MUD FILTRATE AT (MT):
MUD FILTRATE AT (BHT) :
MUD CAKE AT (MT):
MUD CAKE AT (BHT) :
NEUTRON TOOL
TOOL TYPE (EPITHERMAL OR THERMAL):
MATRIX:
MATRIX DENSITY:
HOLE CORRECTION (IN):
TOOL STANDOFF (IN):
STOP DEPTH
..........
1OO5O. 0
16-DEC-97
8C0-609
1000 16-DEC-97
345 17-DEC-97
12130.0
10095.0
9794.0
10095.0
TOOL NUM~ER
STGH-A
SAIT-A
3. 750
10041.5
10050.0
FLO- PRO
8.90
9.0
9.0
6.6
0.095 62.0
O. 105 62.0
0. 067 62.0
REMARKS: Depth Correlated to 15-Dec-1997 Sperry-Sun MWD GR
Standoffs run on SAIT
SAIT run compute standoff, eccentered.
LIS Tape Verification Listing
Schlumberger Alaska Computing Center
14-0CT-1998 16:53
PAGE:
Horizontal well. Tools run on coiled tubing.
Bridged at 10115.6 F
THIS FILE CONTAINS THE RAW OPEN HOLE DATA AT
O. 5 ' SAMPLE RATE.
$
LIS FORMAT DATA
** DATA FORMAT SPECIFICATION RECORD **
** SET TYPE - 64EB **
TYPE REPR CODE VALUE
1
2
3
4
5
6 73
7 65
8 68
9 65
11 66
12 68
13 66
14 65
15 66
16 66
0 66
66 0
66 0
73 16
66 1
66
0.5
FT
64
0
FT
68
1
1
** SET TYPE - CHAN **
NAME SERV UNIT SERVICE API API API API FILE ~ NUAIB SIZE REPR PROCESS
ID ORDER # LOG TYPE CLASS MOD~ SAMP ELEM CODE (HEX)
DEPT FT O0 000 O0 0 3 1 1 4 68 0000000000
GR AIT GAPI O0 000 O0 0 3 1 1 4 68 0000000000
SP AIT MV O0 000 O0 0 3 t 1 4 68 0000000000
TENS AIT LB O0 000 O0 0 3 1 1 4 68 0000000000
** DATA **
DEPT. 10098.000 GR.AIT 78.683 SP.AIT -78.938 TENS.AIT
119.000
DEPT. 10050.000 GR.AIT 55.481 SP.AIT -41.750 TENS.AIT 117.000
LIS Tape Verification Listing
Schlumberger Alaska Computing Center
_ /
14-0CT-1998 16:53
PAGE:
** END OF DATA **
**** FILE TRAILER ****
FILE NAME : EDIT .003
SERVICE : FLIC
VERSION : O01CO1
DATE : 98/10/14
MAX REC SIZE : 8192
FILE TYPE : LO
LAST FILE :
**** FILE HEADER ****
FILE NAME : EDIT .004
SERVICE : FLIC
VERSION : O01CO1
DATE : 98/10/14
MAX REC SIZE : 8192
FILE TYPE : LO
LAST FILE :
FILE HEADER
FILE NUM~ER 4
RAW OPEN HOLEMAIN PASS
Curves and log header data for each run and tool string in separate files; Tool String #1 fo
Sadlerochit run presented first (primary depth control string used to depth shift the Sadler
interval) followed by files for other main pass tool strings per run.
RUN NUMBER: 1
TOOL STRING NUM~ER: 1
PASS AFgA~ER: i
DEPTH INCREMENT: 0.2500
FILE SUb94ARY
VENDOR TOOL CODE START DEPTH
AIT 10098.0
$
LOG HEADER DATA
DATE LOGGED:
SOFTWARE VERSION:
TIME CIRCULATION ENDED:
TIME LOGGER ON BOTTOM:
TD DRILLER (FT):
TD LOGGER(FT):
TOP LOG INTERVAL (FT):
BOTTOM LOG INTERVAL (FT):
STOP DEPTH
10050.0
16-DEC-97
8C0-609
1000 16-DEC-97
345 17-DEC-97
12130.0
10095.0
9794.0
10095.0
LIS Tape Verification Listing
Schlumberger Alaska Computing Center
14-0CT-1998 16:53
PAGE:
10
LOGGING SPEED (FPHR) :
TOOL STRING (TOP TO BOTTOM)
VENDOR TOOL CODE TOOL TYPE
GR GAF~4ARAY
AIT SLIM ARRAY INDUCTION
TOOL NUMBER
...........
STGH-A
SAIT-A
BOREHOLE AND CASING DATA
OPEN HOLE BIT SIZE (IN):
DRILLERS CASING DEPTH (FT):
LOGGERS CASING DEPTH (FT):
3.750
10041.5
10050.0
BOREHOLE CONDITIONS
MUD TYPE: FLO-PRO
MUD DENSITY (LB/G): 8.90
MUD VISCOSITY (S) : 9.0
MUD PH: 9.0
FLUID LOSS (C3): 6.6
MAXIMUM RECORDED TEMPERATURE (DEGF):
RESISTIVITY (OH~) AT TEMPERATURE (DEGF):
MUD AT MEAS~ TEMPERATURE (MT): O. 095
MUD AT BOTTOM HOLE TEMPERATURE (BHT):
MUD FILTRATE AT (MT): O. 105
MUD FILTRATE AT (BHT) :
MUD CAKE AT (MT): O. 067
MUD CAKE AT (BHT) :
62.0
62.0
62.0
NEUTRON TOOL
TOOL TYPE (EPITHERMAL OR THERMAL):
MATRIX:
MATRIX DENSITY:
HOLE CORRECTION (IN):
TOOL STANDOFF (IN):
REMARKS: Depth Correlated to 15-Dec-1997 Sperry-Sun MWD GR
Standoffs run on SAIT
SAIT run compute standoff, eccentered.
Horizontal well. Tools run on coiled tubing.
Bridged at 10115.6 F
THIS FILE CONTAINS THE RAW OPEN HOLE DATA AT
0.25' SAMPLE RATE.
$
LIS FORMAT DATA
LIS Tape Verification Listing
Schlumberger Alaska Computing Center
14-0CT-1998 16:53
PAGE: 11
** DATA FORMAT SPECIFICATION RECORD **
** SET TYPE - 64EB **
TYPE REPR CODE VALUE
1 66 0
2 66 0
3 73 28
4 66 1
5 66
6 73
7 65
8 68 0.25
9 65 FT
11 66 36
12 68
13 66 0
14 65 FT
15 66 68
16 66 1
0 66 1
** SET TYPE - CHAN **
NAME SERV UNIT SERVICE API API API API FILE NUFiB NUMB SIZE REPR PROCESS
ID ORDER # LOG TYPE CLASS MOD NUM~ SAMP ELEM CODE (HEX)
DEPT FT
AFl 0 AIT OH~4M
AF20 AIT
AF30 AIT OH~f
AF60 AIT
AFgO AIT OH~4
AIBD AIT IN
O0 000 O0 0 4 1 1 4 68 0000000000
O0 000 O0 0 4 1 1 4 68 0000000000
O0 000 O0 0 4 1 1 4 68 0000000000
O0 000 O0 0 4 1 1 4 68 0000000000
O0 000 O0 0 4 1 1 4 68 0000000000
O0 000 O0 0 4 1 1 4 68 0000000000
O0 000 O0 0 4 1 1 4 68 0000000000
** DATA **
DEPT. 10098.000 AFiO.AIT 3.033 AF20.AIT 2.250 AF30.AIT
AF60.AIT 5.095 AF90.AIT 6.564 AIBD.AIT 3.750
2. 856
** END OF DATA **
LIS Tape Verification Listing
Schlumberger Alaska Computing Center
14-0CT-1998 16:53
PAGE:
12
**** FILE TRAILER ****
FILE NAME : EDIT .004
SERVICE : FLIC
VERSION : O01CO1
DATE : 98/10/14
MAX REC SIZE : 8192
FILE TYPE : LO
LAST FILE :
**** FILE HEADER ****
FILE NAME : EDIT .005
SERVICE : FLIC
VERSION : O01CO1
DATE : 98/10/14
MAX REC SIZE : 8192
FILE TYPE : LO
LAST FILE :
FILE HEADER
FILE NUMBER 5
RAW CASED HOLE MAIN PASS
Curves and log header data for open hole logs run into casing.
PASS NUMBER: 1
DEPTH INCREMENT: O . 5000
FILE SUMFL~Y
VENDOR TOOL CODE START DEPTH
AIT 10050.0
$
LOG HEADER DATA
STOP DEPTH
9793.0
DATE LOGGED:
SOFTWARE VERSION:
TIME CIRCULATION ENDED:
TIME LOGGER ON BOTTOM:
TD DRILLER (FT) :
TD LOGGER (FT) :
TOP LOG INTERVAL (FT) :
BOTTOM LOG INTERVAL (FT) :
LOGGING SPEED (FPHR) :
TOOL STRING (TOP TO BOTTOM)
VENDOR TOOL CODE TOOL TYPE
GR GAM~A RAY
AIT SLIM ARRAY INDUCTION
$
BOREHOLEAND CASING DATA
OPEN HOLE BIT SIZE (IN):
16-DEC-97
8C0-609
1000 16-DEC-97
345 17-DEC-97
12130.0
10095.0
9794.0
10095.0
TOOL NUMBER
STGH-A
SAIT-A
3. 750
LIS Tape Verification Listing
Schlumberger Alaska Computing Center
14-0CT~1998 16:53
PAGE:
13
DRILLERS CASING DEPTH (FT) :
LOGGERS CASING DEPTH (FT) :
10041.5
10050.0
BOREHOLE CONDITIONS
MUD TYPE: FLO-PRO
MUD DENSITY (LB/G): 8.90
MUD VISCOSITY (S) : 9.0
MUD PH: 9.0
FLUID LOSS (C3): 6.6
MAXIMUM RECORDED TEMPERATURE (DEGF):
RESISTIVITY (OHMM) AT TEMPERATURE (DEGF):
MUD AT M~.ASURED TEMPERATURE (MT): O. 095
MUD AT BOTTOM HOLE TEMPERATURE (BHT) :
MUD FILTRATE AT (MT): O. 105
MUD FILTRATE AT (BHT) :
MUD CAKE AT (MT): O. 067
MUD CAKE AT (BHT):
62.0
62.0
62.0
NEUTRON TOOL
TOOL TYPE (EPITHERMAL OR THERMAL):
MATRIX:
MATRIX DENSITY:
HOLE CORRECTION (IN):
TOOL STANDOFF (IN):
REMARKS: Depth Correlated to 15-Dec-1997 Sperry-Sun MWD GR
Standoffs run on SAIT
SAIT run compute standoff, eccentered.
Horizontal well. Tools run on coiled tubing.
Bridged at 10115.6 F
THIS FILE CONTAINS THE RAW CASED HOLE DATA AT 0.5'
SAMPLE RATE.
$
LIS FORMAT DATA
** DATA FORMAT SPECIFICATION RECORD **
** SET TYPE - 64EB **
TYPE REPR CODE VALUE
1 66 0
2 66 0
3 73 16
4 66 1
5 66
6 73
7 65
8 68 O. 5
9 65 FT
LIS Tape Verification Listing
Schlumberger Alaska Computing Center
14-0CT-1998 16:53
PAGE:
14
TYPE REPR CODE VALUE
11 66 64
12 68
13 66 0
14 65 FT
15 66 68
16 66 1
0 66 1
** SET TYPE - CHAN **
NAME SERV UNIT SERVICE API API API API FILE AF]M~ NUF~ SIZE REPR PROCESS
ID ORDER # LOG TYPE CLASS MOD NUMB SAMP ELEM CODE (HEX)
DEPT FT O0 000 O0 0 5 1 1 4 68 0000000000
TENS AIT LB O0 000 O0 0 $ 1 1 4 68 0000000000
GRCH AIT GAPI O0 000 O0 0 5 1 1 4 68 0000000000
SP AIT MV O0 000 O0 0 5 1 1 4 68 0000000000
** DATA **
DEPT. 10050.000 TENS.AIT 117.000 GRCH. AIT 55.481 SP.AIT
DEPT. 9793.000 TENS.AIT 124.000 GRCH.AIT 66.880 SP.AIT
-41. 750
-23.250
** END OF DATA **
**** FILE TRAILER ****
FILE NAM~ : EDIT .005
SERVICE : FLIC
VERSION · O01CO1
DATE : 98/10/14
MAX REC SIZE : 8192
FILE TYPE : LO
LAST FILE :
**** FILE HEADER ****
FILE NAME : EDIT .006
SERVICE : FLIC
VERSION . O01CO1
DATE : 98/10/14
MAX REC SIZE : 8192
FILE TYPE : LO
LAST FILE :
LIS Tape Verification Listing
Schlumberger Alaska Computing Center
14-0CT-1998 16:53
PAGE:
15
FILE HEADER
FILE NUMBER 6
RAW CASED HOLE MAIN PASS
Curves and log header data for open hole logs run into casing.
PASS NUMBER: 1
DEPTH INCREMENT: 0.2500
FILE SUb~W~RY
VENDOR TOOL CODE START DEPTH
AIT 10050.0
$
LOG HEADER DATA
STOP DEPTH
9793.0
DATE LOGGED:
SOFTWARE VERSION:
TIME CIRCULATION ENDED:
TIME LOGGER ON BOTTOM:
TD DRILLER (FT) :
TD LOGGER (FT) :
TOP LOG INTERVAL (FT):
BOTTOM LOG INTERVAL (FT) :
LOGGING SPEED (FPHR) :
TOOL STRING (TOP TO BOTTOM)
VENDOR TOOL CODE TOOL TYPE
GR GAM~A RAY
AIT SLIM ARRAY INDUCTION
$
BOREHOLE AND CASING DATA
OPEN HOLE BIT SIZE (IN):
DRILLERS CASING DEPTH (FT) :
LOGGERS CASING DEPTH (FT) :
BOREHOLE CONDITIONS
MUD TYPE:
MUD DENSITY (LB/G):
MUD VISCOSITY (S) :
MUD PH:
FLUID LOSS (C3):
MAXIMUM RECORDED TEMPERATURE (DEGF) :
RESISTIVITY (OH~) AT TEMPERATURE (DEGF):
MUD AT ~IEASURED TEMPERATURE (MT):
MUD AT BOTTOM HOLE TEMPERATURE (BHT):
MUD FILTRATE AT (MT):
MUD FILTRATE AT (BHT) :
MUD CAKE AT (MT):
MUD CAKE AT (BHT) :
NEUTRON TOOL
TOOL TYPE (EPITHERMAL OR THERMAL):
MATRIX:
MATRIX DENSITY:
16-DEC-97
8C0-609
1000 16-DEC-97
345 17-DEC-97
12130.0
10095.0
9794.0
10095.0
TOOL NU14~ER
STGH-A
SAIT~A
3.750
10041.5
10050.0
FLO- PRO
8.90
9.0
9.0
6.6
0.095 62.0
0.105 62.0
O. 067 62.0
LIS Tape Verification Listing
Schlumberger Alaska Computing Center
14-0CT-1998 16:53
PAGE:
16
HOLE CORRECTION (IN):
TOOL STANDOFF (IN):
REMARKS: Depth Correlated to 15-Dec-1997 Sperry-Sun MWD GR
Standoffs run on SAIT
SAIT run compute standoff, eccentered.
Horizontal well. Tools run on coiled tubing.
Bridged at 10115.6 F
THIS FILE CONTAINS THE RAW CASED HOLE DATA AT 0.25'
SAMPLE RATE.
$
LIS FORMAT DATA
** DATA FORMAT SPECIFICATION RECORD **
** SET TYPE ~ 64EB **
TYPE REPR CODE VALUE
1 66 0
2 66 0
3 73 28
4 66 1
5 66
6 73
7 65
8 68 0.25
9 65 FT
11 66 36
12 68
13 66 0
14 65 FT
15 66 68
16 66 1
0 66 1
** SET TYPE ~ CHAN **
NAME SERV UNIT SERVICE API API API API FILE NTJM~ NUM~ SIZE REPR PROCESS
ID ORDER # LOG TYPE CLASS MOD NUMB SAMP ELEM CODE (HEX)
DEPT FT O0 000 O0 0 6 1 1 4 68 0000000000
CALI AIT IN O0 000 O0 0 6 1 1 4 68 0000000000
AFiO AIT OH14~ O0 000 O0 0 6 1 1 4 68 0000000000
AF20 AIT O~ O0 000 O0 0 6 1 1 4 68 0000000000
AF30 AIT OHM~ O0 000 O0 0 6 1 1 4 68 0000000000
AF60 AIT OHt4~ O0 000 O0 0 6 1 1 4 68 0000000000
AF90 AIT O~ O0 000 O0 0 6 1 1 4 68 0000000000
LIS Tape Verification Listing
Schlumberger Alaska Computing Center
14-0CT-1998 16:53
PAGE:
17
** DATA **
DEPT. 10050.000 CALI.AIT 3.750 AFIO.AIT 0.206 AF20.AIT
AF30.AIT 0.225 AF60.AIT 65.315 AF90.AIT 6.620
DEPT. 9793.250 CALI.AIT 3.750 AFiO.AIT 60.324 AF20.AIT
AF30.AIT 1950.000 AF60.AIT 21.129 AF90.AIT 42.252
0.230
1950.000
** END OF DATA **
**** FILE TRAILER ****
FILE NAFiE : EDIT .006
SERVICE : FLIC
VERSION : O01CO1
DATE : 98/10/14
MAX REC SIZE : 8192
FILE TYPE : LO
LAST FILE :
**** TAPE TRAILER ****
SERVICE NAME : EDIT
DATE : 98/10/14
ORIGIN : FLIC
TAPE NAM~ : 98148
CONTINUATION # : 1
PREVIOUS TAPE :
CO~zENT : BP EXPLORATION, P-O6A, PRUDHOE BAY, API #50-029-22166-01
**** REEL TRAILER ****
SERVICE NAME : EDIT
DATE : 98/10/14
ORIGIN : FLIC
REEL NAME : 98148
CONTINUATION # :
PREVIOUS REEL :
COGENT : BP EXPLORATION, P-O6A, PRUDHOE BAY, API #50-029-22166-01
Sperry-Sun Drilling Services
LIS Scan Utility
Wed Jan 14 15:06:38 1998
Reel Header
Service name ............. LISTPE
Date ..................... 98/01/14
Origin ................... STS
Reel Name ................ UNKNOWN
Continuation Number ...... 01
Previous Reel Name ....... UNKNOWN'
Comments ................. STS LIS Writing Library. Scientific
Technical Services
Tape Header
Service name ............. LISTPE
Date ..................... 98/01/14
Origin ................... STS
Tape Name ................ UNKNOWN
Continuation Number ...... 01
Previous Tape Name ....... UNKNOWN
Comments ................. STS LIS Writing Library. Scientific
Technical Services
Physical EOF
Comment Record
TAPE HEADER
PRUDHOE BAY UNIT
MWD/MAD LOGS
WELL NAME:
API NUMBER:
OPERATOR:
LOGGING COMPANY:
TAPE CREATION DATE:
JOB DATA
JOB NUMBER:
LOGGING ENGINEER:
OPERATOR WITNESS:
MWD RUN 1
AK-MW-80045
B. JAHN
HILDRETH/SEV
P-06A
500292216601
BP EXPLORATION (ALASKA), INC.
SPERRY-SUN DRILLING SERVICES
14-JAN-98
MWD RUN 2
AK-MW-80045
B. JAHN
HILDRETH/SEV
MWD RUN 3
AK-MW-80045
B. JAHN
HILDRETH/$EV
JOB NUMBER:
LOGGING ENGINEER:
OPERATOR WITNESS:
JOB NUMBER:
LOGGING ENGINEER:
OPERATOR WITNESS:
SURFACE LOCATION
MWD RUN 4
AK-MW-80045
B. JAHN
HILDRETH/SEV
MWD RUN 7
AK-MW-80045
B. JA/{N
HILDRETH/PAR
MWD RUN 5
AK-MW-80045
B. JA/~N
HILDRETH/SEV
MWD RUN 6
AK-MW-80045
B. JAHN
HILDRETH/SEV
SECTION:
TOWNSHIP:
RANGE:
FNL:
FSL:
FEL:
FWL:
ELEVATION (FT FROM MSL 0)
KELLY BUSHING:
DERRICK FLOOR:
GROUND LEVEL:
WELL CASING RECORD
1ST STRING
2ND STRING
3RD STRING
PRODUCTION STRING
REMARKS:
31
llN
13E
2506
1963
92.10
.00
.00
OPEN HOLE CASING DRILLERS
BIT SIZE (IN) SIZE (IN) DEPTH (FT)
7.625 9966.0
4.500 9739.0
5.500 10050.0
3.750 12130.0
1. ALL DEPTHS ARE MEASURED DEPTHS (MD) UNLESS OTHERWISE
NOTED.
2. ALL VERTICAL DEPTHS ARE SUB-SEATRUE VERTICAL DEPTHS
( S STVD ) .
3. MWD RUNS 1 THROUGH 7 ARE DIRECTIONAL WITH NATURAL
GAMMA PROBE (NGP)
UTILIZING SCINTILLATION DETECTOR.
4. GAMMA RAY DATA FROM 12055'MD, 8994'SSTVD TO
12125'MD, 9015'SSTVD WAS
ACQUIRED ON A MEASUREMENT AFTER DRILLING (MAD) PASS
WHILE TRIPPING OUT OF
THE HOLE AFTER MWD RUN 7. THIS DATA IS PRESENTED AS PART
OF MWD RUN 5, AND
ALL OF MWD RUN 6.
5. DEPTH SHIFT/CORRECTION OF MWD DATA IS WAIVED AS PER
THE PHONE CONVERSATION
BETWEEN B METZGER OF BP EXPLORATION (ALASKA), INC. AND M
MUNYAK OF SPERRY-
SUN DRILLING SERVICES ON 01/06/98.
6. THIS WELL REACHED A TOTAL DEPTH (TD) OF 12130'MD,
9028'SSTVD.
SROP = SMOOTHED RATE OF PENETRATION WHILE DRILLING.
SGRD = SMOOTHED GAMMA RAY.
THE SUFFIX -'M' DENOTES DATA ACQUIRED ON A MAD PASS
$
File Header
Service name ............. STSLIB.001
Service Sub Level Name...
Version Number ........... 1.0.0
Date of Generation ....... 98/01/14
Maximum Physical Record..65535
File Type ................ LO
Previous File Name ....... STSLIB.000
Comment Record
FILE HEADER
FILE NUMBER: 1
EDITED MERGED MWD
Depth shifted and clipped curves; all bit runs merged.
DEPTH INCREMENT: .5000
FILE SUMMARY
PBU TOOL CODE
GR
ROP
$
BASELINE CURVE FOR SHIFTS:
CURVE SHIFT DATA (MEASURED DEPTH)
START DEPTH
10027.5
10055.0
BASELINE DEPTH
$
MERGED DATA SOURCE
PBU TOOL CODE
MWD
MWD
MWD
MWD
MWD
MWD
MWD
$
REMARKS:
STOP DEPTH
12103.5
12129.5
EQUIVALENT UNSHIFTED DEPTH
BIT RUN NO MERGE TOP MERGE BASE
1 10055.0 10236.0
2 10237.0 10441.0
3 10441.0 11350.0
4 11350.0 11924.0
5 11924.0 12101.0
6 12101.0 12125.0
7 12125.0 12130.0
MERGED MAIN PASS.
$
Data Format Specification Record
Data Record Type .................. 0
Data Specification Block Type ..... 0
Logging Direction ................. Down
Optical log depth units ........... Feet
Data Reference Point .............. Undefined
Frame Spacing ..................... 60 .liN
Max frames per record ............. Undefined
Absent valuel ..................... -999.25
Depth Units .......................
Datum Specification Block sub-type...0
Name Service Order Units Size Nsam Rep Code Offset Channel
DEPT FT 4 1 68 0 1
GR MWD AAPI 4 1 68 4 2
ROP MWD FT/H 4 1 68 8 3
First
Name Min Max Mean Nsam Reading
DEPT 10027.5 12129.5 11078.5 4205 10027.5
GR 13.97 553.84 72.0044 4153 10027.5
ROP 21.02 1440 82.3664 4150 10055
Last
Reading
12129.5
12103.5
12129.5
First Reading For Entire File .......... 10027.5
Last Reading For Entire File ........... 12129.5
File Trailer
Service name ............. STSLIB.001
Service Sub Level Name...
Version Number ........... 1.0.0
Date of Generation ....... 98/01/14
Maximum Physical Record..65535
File Type ................ LO
Next File Name ........... STSLIB.002
Physical EOF
File Header
Service name ............. STSLIB.002
Service Sub Level Name...
Version Number ........... 1.0.0
Date of Generation ....... 98/01/14
Maximum Physical Record..65535
File Type ................ LO
Previous File Name ....... STSLIB.001
Comment Record
FILE HEADER
FILE NUMBER: 2
RAW MWD
Curves and log header data for each bit run in separate files.
BIT RUN NUMBER: 1
DEPTH INCREMENT: .5000
FILE SUMMARY
VENDOR TOOL CODE START DEPTH STOP DEPTH
GR 10027.5 10208.5
ROP 10055.0 10236.5
$
LOG HEADER DATA
DATE LOGGED: 10-DEC-97
SOFTWARE
SURFACE SOFTWARE VERSION:
DOWNHOLE SOFTWARE VERSION:
6.90
DATA TYPE (MEMORY OR REAL-TIME): MEMORY
TD DRILLER (FT): 10230.0
TOP LOG INTERVAL (FT): 10055.0
BOTTOM LOG INTERVAL (FT) : 10230.0
BIT ROTATING SPEED (RPM):
HOLE INCLINATION (DEG
MINIMUM ANGLE: 41.3
MAXIMUM ANGLE: 85.9
TOOL STRING (TOP TO BOTTOM)
VENDOR TOOL CODE TOOL TYPE
NGP NATURAL GAMMA PROBE
$
BOREHOLE AND CASING DATA
OPEN HOLE BIT SIZE (IN):
DRILLER'S CASING DEPTH (FT) :
BOREHOLE CONDITIONS
MUD TYPE:
MSC 1.32
NGP 5.74, DEP 2.21, PCD
TOOL NUMBER
PCG 17
3.750
3.8
FLO-PRO
MUD DENSITY (LB/G):
MUD VISCOSITY (S):
MUD PH:
MUD CHLORIDES (PPM):
FLUID LOSS (C3):
RESISTIVITY (OHMS4) AT TEMPERATURE (DEGF)
MUD AT MEASURED TEMPERATURE (MT):
MUD AT MAX CIRCULATING TERM?ERATURE:
MUD FILTRATE AT MT:
MUD CAKE AT MT:
NEUTRON TOOL
MATRIX:
MATRIX DENSITY:
HOLE CORRECTION (IN):
TOOL STANDOFF (IN):
EWR FREQUENCY (HZ):
REMARKS:
$
Data Format Specification Record
Data Record Type .................. 0
Data Specification Block Type ..... 0
Logging Direction ................. Down
Optical log depth units ........... Feet
Data Reference Point .............. Undefined
Frame Spacing ..................... 60 .liN
Max frames per record ............. Undefined
Absent value ...................... -999.25
Depth Units .......................
Datum Specification Block sub-type...0
9.10
65.0
8.6
6.8
.000
.000
.000
.000
.3
Name Service Order Units Size Nsam Rep Code Offset Channel
DEPT FT 4 1 68 0 1
GR MWD 1 AAPI 4 1 68 4 2
ROP MWD 1 FT/H 4 1 68 8 3
60.9
First
Name Min Max Mean Nsam Reading
DEPT 10027.5 10236.5 10132 419 10027.5
GR 25.68 404.14 76.7801 363 10027.5
ROP 21.02 444.69 70.605 364 10055
Last
Reading
10236.5
10208.5
10236.5
First Reading For Entire File .......... 10027.5
Last Reading For Entire File ........... 10236.5
File Trailer
Service name ............. STSLIB.002
Service Sub Level Name...
Version Number ........... 1.0.0
Date of Generation ....... 98/01/14
Maximum Physical Record..65535
File Type ................ LO
Next File Name ........... STSLIB.003
Physical EOF
File Header
Service name ............. STSLIB.003
Service Sub Level Name...
Version Number ........... 1.0.0
Date of Generation ....... 98/01/14
Maximum Physical Record..65535
File Type ................ LO
Previous File Name ....... STSLIB.002
Conunent Record
FILE HEADER
FILE NUMBER: 3
RAW MWD
Curves and log header data for each bit run in separate files.
BIT RUN NUMBER: 2
DEPTH INCREMENT: .5000
FILE SUMMARY
VENDOR TOOL CODE START DEPTH
GR 10213.0
ROP 10239.0
$
LOG HEADER DATA
DATE LOGGED:
SOFTWARE
SURFACE SOFTWARE VERSION:
DOWNHOLE SOFTWARE VERSION:
6.90
DATA TYPE (MEMORY OR REAL-TIME):
TD DRILLER (FT):
TOP LOG INTERVAL (FT):
BOTTOM LOG INTERVAL (FT):
BIT ROTATING SPEED (RPM):
HOLE INCLINATION (DEG
MINIMUM ANGLE:
MAXIMUM ANGLE:
STOP DEPTH
10416.0
10441.0
TOOL STRING (TOP TO BOTTOM)
VENDOR TOOL CODE TOOL TYPE
NGP NATURAL GAMMA PROBE
$
BOREHOLE AND CASING DATA
OPEN HOLE BIT SIZE (IN):
DRILLER'S CASING DEPTH (FT) :
BOREHOLE CONDITIONS
MUD TYPE:
MUD DENSITY (LB/G):
MUD VISCOSITY (S):
MUD PH:
MUD CHLORIDES (PPM) :
FLUID LOSS (C3):
RESISTIVITY (OHMM) AT TEMPERATURE (DEGF)
Il-DEC-97
MSC 1.32
NGP 5.74, DEP 2.21, PCD
MEMORY
10441.0
10237.0
10441.0
76.5
92.5
TOOL NUMBER
NGP SPC 184
3.750
3.8
FLO-PRO
9.10
65.0
9.1
5.8
MUD AT MEASURED TEMPERATURE (MT):
MUD AT MAX CIRCULATING TERMPERATURE:
MUD FILTRATE AT MT:
MUD CAKE AT MT:
NEUTRON TOOL
MATRIX:
MATRIX DENSITY:
HOLE CORRECTION
(IN):
TOOL STANDOFF (IN) :
EWR FREQUENCY (HZ) :
REMARKS:
$
Data Format Specification Record
Data Record Type .................. 0
Data Specification Block Type...2.0
Logging Direction ................. Down
Optical log depth units ........... Feet
Data Reference Point .............. Undefined
Frame Spacing ..................... 60 .liN
Max frames per record ............. Undefined
Absent value ...................... -999.25
Depth Units .......................
Datum Specification Block sub-type...0
.000
.000
.000
.000
.3
Name Service Order Units Size Nsam Rep Code Offset Channel
DEPT FT 4 1 68 0 1
GR MWD 2 AAPI 4 1 68 4 2
ROP MWD 2 FT/H 4 1 68 8 3
63.3
First
Name Min Max Mean Nsam Reading
DEPT 10213 10441 10327 457 10213
GR 30.45 268.56 83.4519 407 10213
ROP 31.11 303.75 87.6419 ~405 10239
Last
Reading
10441
10416
10441
First Reading For Entire File .......... 10213
Last Reading For Entire File ....... 2...10441
File Trailer
Service name ............. STSLIB.003
Service Sub Level Name...
Version Number ........... 1.0.0
Date of Generation ....... 98/01/14
Maximum Physical Record..65535
File Type ................ LO
Next File Name ........... STSLIB.004
Physical EOF
File Header
Service name ............. STSLIB.004
Service Sub Level Name...
Version Number ........... 1.0.0
Date of Generation ....... 98/01/14
Maximum Physical Record..65535
File Type ................ LO
Previous File Name ....... STSLIB.003
Comment Record
FILE HEADER
FILE NUMBER: 4
RAW MWD
Curves and log header data for each bit run in separate files.
BIT RUN NUMBER: 3
DEPTH INCREMENT: .5000
FILE SUMMARY
VENDOR TOOL CODE STkRT DEPTH
GR 10416.5
ROP 10441.5
$
LOG HEADER DATA
DATE LOGGED:
SOFTWARE
SURFACE SOFTWARE VERSION:
DOWNHOLE SOFTWARE VERSION:
6.90
DATA TYPE (MEMORY OR REAL-TIME):
TD DRILLER (FT) :
TOP LOG INTERVAL (FT):
BOTTOM LOG INTERVAL (FT):
BIT ROTATING SPEED (RPM) :
HOLE INCLINATION (DEC
MINIMUM ANGLE:
MAXIMUM ANGLE:
STOP DEPTH
11322.5
11349.5
TOOL STRING (TOP TO BOTTOM)
VENDOR TOOL CODE TOOL TYPE
NGP NATURAL GAMMA PROBE
$
BOREHOLE AND CASING DATA
OPEN HOLE BIT SIZE (IN):
DRILLER'S CASING DEPTH (FT):
BOREHOLE CONDITIONS MUD TYPE:
MUD DENSITY (LB/G):
MUD VISCOSITY (S):
MUD PH:
MUD CHLORIDES (PPM):
FLUID LOSS (C3):
RESISTIVITY (OHMM) AT TEMPERATURE (DEGF)
MUD AT MEASURED TEMPERATURE (MT):
MUD AT MAX CIRCULATING TERMPERATURE:
MUD FILTRATE AT MT:
MUD CAKE AT MT:
NEUTRON TOOL
13-DEC-97
MSC 1.32
NGP 5.74, DEP 2.21, PCD
MEMORY
11350.0
10441.0
11350.0
84.3
102.7
TOOL NUMBER
PCG 17
3.750
3.8
FLO- PRO
9.10
.0
9.0
5.8
.000
.000
.000
.000
68.0
MATRIX:
MATRIX DENSITY:
HOLE CORRECTION (IN):
TOOL STANDOFF (IN) :
EWR FREQUENCY (HZ) :
REMARKS:
$
Data Format Specification Record
Data Record Type .................. 0
Data Specification Block Type ..... 0
Logging Direction ................. Down
Optical log depth units ........... Feet
Data Reference Point .............. Undefined
Frame Spacing ..................... 60 .liN
Max frames per record ............. Undefined
Absent value ...................... -999.25
Depth Units .......................
Datum Specification Block sub-type...0
.3
Name Service Order Units Size Nsam Rep Code Offset Channel
DEPT FT 4 1 68 0 1
GR MWD 3 AAPI 4 1 68 4 2
ROP MWD 3 FT/H 4 1 68 8 3
First
Name Min Max Mean Nsam Reading
DEPT 10416.5 11349.5 10883 1867 10416.5
GR 13.97 553.84 86.5576 1813 10416.5
ROP 25.3 506.14 79.8934 1817 10441.5
Last
Reading
11349.5
11322.5
11349.5
First Reading For Entire File .......... 10416.5
Last Reading For Entire File ........... 11349.5
File Trailer
Service name ............. STSLIB.004
Service Sub Level Name...
Version Number ........... 1.0.0
Date of Generation ....... 98/01/14
Maximum Physical Record..65535
File Type ................ LO
Next File Name ........... STSLIB.005
Physical EOF
File Header
Service name ............. STSLIB.005
Service Sub Level Name...
Version Number ........... 1.0.0
Date of Generation ....... 98/01/14
Maximum Physical Record..65535
File Type ................ LO
Previous File Name ....... STSLIB.004
Comment Record
FILE HEADER
FILE NUMBER: 5
RAW MWD
Curves and log header data for each bit run in separate files.
BIT RUN NUMBER: 4
DEPTH INCREMENT: .5000
FILE SUMMARY
VENDOR TOOL CODE START DEPTH
GR 11323.5
ROP 11350.0
$
LOG HEADER DATA
DATE LOGGED:
SOFTWARE
SURFACE SOFTWARE VERSION:
DOWNHOLE SOFTWARE VERSION:
6.90
DATA TYPE (MEMORY OR REAL-TIME):
TD DRILLER (FT):
TOP LOG INTERVAL (FT) :
BOTTOM LOG INTERVAL (FT):
BIT ROTATING SPEED (RPM):
HOLE INCLINATION (DEG
MINIMUM ANGLE:
MAXIMUM ANGLE:
STOP DEPTH
11898.0
11924.5
TOOL STRING (TOP TO BOTTOM)
VENDOR TOOL CODE TOOL TYPE
NGP NATURAL GAM~. PROBE
$
BOREHOLE AND CASING DATA
OPEN HOLE BIT SIZE (IN):
DRILLER'S CASING DEPTH (FT):
BOREHOLE CONDITIONS MUD TYPE:
MUD DENSITY (LB/G):
MUD VISCOSITY (S):
MUD PH:
MUD CHLORIDES (PPM):
FLUID LOSS (C3) :
RESISTIVITY (OHMM) AT TEMPERATURE (DEGF)
MUD AT MEASURED TEMPERATURE (MT):
MUD AT MAX CIRCULATING TERMPERATURE:
MUD FILTRATE AT MT:
MUD CAKE AT MT:
NEUTRON TOOL
MATRIX:
MATRIX DENSITY:
HOLE CORRECTION (IN):
TOOL STANDOFF (IN):
EWR FREQUENCY (HZ) :
14-DEC-97
MSC 1.32
NGP 5.74, DEP 2.21, PCD
MEMORY
11924.0
11350.0
11924.0
83.8
94.9
TOOL NUMBER
NGP SPC 282
3.750
3.8
FLO- PRO
8.90
.0
9.1
6.0
.000
.000
.000
.000
75.0
.3
REMARKS:
$
Data Format Specification Record
Data Record Type .................. 0
Data Specification Block Type ..... 0
Logging Direction ................. Down
Optical log depth units ........... Feet
Data Reference Point .............. Undefined
Frame Spacing ..................... 60 .liN
Max frames per record ............. Undefined
Absent value ...................... -999.25
Depth Units .......................
Datum Specification Block sub-type...0
Name Service Order Units Size Nsam Rep Code Offset Channel
DE?T FT 4 1 68 0 1
GR MWD 4 AAPI 4 1 68 4 2
ROP MWD 4 FT/H 4 1 68 8 3
First
Name Min Max Mean Nsam Reading
DEPT 11323.5 11924.5 11624 1203 11323.5
GR 21.82 551.24 54.565 1150 11323.5
ROP 32.27 187.89 78.6683 1150 11350
Last
Reading
11924.5
11898
11924.5
First Reading For Entire File .......... 11323.5
Last Reading For Entire File ........... 11924.5
File Trailer
Service name ............. STSLIB.005
Service Sub Level Name...
Version Number ........... 1.0.0
Date of Generation ....... 98/01/14
MaXimum Physical Record..65535
File Type ................ LO
Next File Name ........... STSLIB.006
Physical EOF
File Header
Service name ............. STSLIB.006
Service Sub Level Name...
Version Number ........... 1.0.0
Date of Generation ....... 98/01/14
Maximum Physical Record..65535
File Type ................ LO
Previous File Name ....... STSLIB.005
Con~nent Record
FILE HEADER
FILE NUMBER:
RAW MWD
Curves and log header data for each bit run in separate files.
BIT RUN NUMBER: 5
DEPTH INCREMENT: .5000
FILE SUMMARY
VENDOR TOOL CODE START DEPTH
GR 11898.5
ROP 11925.5
$
LOG HEADER DATA
DATE LOGGED:
SOFTWARE
SURFACE SOFTWARE VERSION:
DOWNHOLE SOFTWARE VERSION:
6.90
DATA TYPE (MEMORY OR REAL-TIME):
TD DRILLER (FT):
TOP LOG INTERVAL (FT):
BOTTOM LOG INTERVAL (FT):
BIT ROTATING SPEED (RPM):
HOLE INCLINATION (DEG
MINIMUM ANGLE:
MAXIMUM ANGLE:
STOP DEPTH
12072.5
12100.5
TOOL STRING (TOP TO BOTTOM)
VENDOR TOOL CODE TOOL TYPE
NGP NATURAL GAMMA PROBE
$
BOREHOLE AND CASING DATA
OPEN HOLE BIT SIZE (IN):
DRILLER'S CASING DEPTH (FT):
BOREHOLE CONDITIONS MUD TYPE:
MUD DENSITY (LB/G):
MUD VISCOSITY (S):
MUD PH:
MUD CHLORIDES (PPM):
FLUID LOSS (C3) :
RESISTIVITY (OHMM) AT TEMPERATURE (DEGF)
MUD AT MEASURED TEMPERATURE (MT):
MUD AT MAX CIRCULATING TERMPERATURE:
MUD FILTRATE AT MT:
MUD CAKE AT MT:
NEUTRON TOOL
MATRIX:
MATRIX DENSITY:
HOLE CORRECTION (IN):
TOOL STANDOFF (IN) :
EWR FREQUENCY (HZ) :
REMARKS:
Data Format Specification Record
Data Record Type .................. 0
15-DEC-97
MSC 1.32
NGP 5.74, DEP 2.21, PCD
MEMORY
12101.0
11924.0
12101.0
73.5
83.8
TOOL NUMBER
PCG 17
3.750
3.8
FLO-PRO
8.90
.0
9.0
7.0
.000
.000
.000
.000
75.0
.3
Data Specification Block Type ..... 0
Logging Direction ................. Down
Optical log depth units ........... Feet
Data Reference Point .............. Undefined
Frame Spacing ..................... 60 .liN
Max frames per record ............. Undefined
Absent value ...................... -999.25
Depth Units .......................
Datum Specification Block sub-type...0
Name Service Order Units Size Nsam Rep Code Offset Channel
DEPT FT 4 1 68 0 1
GR MWD 5 AAPI 4 1 68 4 2
ROP MWD 5 FT/H 4 1 68 8 3 -
First
Name Min Max Mean Nsam Reading
DEPT 11898.5 12100.5 11999.5 405 11898.5
GR 24.24 118.44 42.1224 349 11898.5
ROP 37.47 1440 109.693 351 11925.5
Last
Reading
12100.5
12072.5
12100.5
First Reading For Entire File ...... 2...11898.5
Last Reading For Entire File ........... 12100.5
File Trailer
Service name ............. STSLIB.006
Service Sub Level Name...
Version Number ........... 1.0.0
Date of Generation ....... 98/01/14
Maximum Physical Record..65535
File Type ................ LO
Next File Name ........... STSLIB.007
Physical EOF
File Header
Service name ............. STSLIB.007
Service Sub Level Name...
Version Number ........... 1.0.0
Date of Generation ....... 98/01/14
Maximum Physical Record..65535
File Type ................ LO
Previous File Name ....... STSLIB.006
Comment Record
FILE HEADER
FILE NUMBER: 7
RAW MWD
Curves and log header data for each bit run in separate files.
BIT RUN NUMBER: 6
DEPTH INCREMENT: .5000
FILE SUMMARY
VENDOR TOOL CODE START DEPTH STOP DEPTH
GR 12073.5
ROP 12101.0
LOG HEADER DATA
DATE LOGGED:
S O FTWARE
SURFACE SOFTWARE VERSION:
DOWNHOLE SOFTWARE VERSION:
6.90
DATA TYPE (MEMORY OR REA_L-TIME):
TD DRILLER (FT):
TOP LOG INTERVAL (FT):
BOTTOM LOG INTERVAL (FT):
BIT ROTATING SPEED (RPM):
HOLE INCLINATION (DEG
MINIMUM ANGLE:
MAXIMUM ANGLE:
12098.0
12125.0
TOOL STRING (TOP TO BOTTOM)
VENDOR TOOL CODE TOOL TYPE
NGP NATURAL GAMMA PROBE
$
BOREHOLE AND CASING DATA
OPEN HOLE BIT SIZE (IN):
DRILLER'S CASING DEPTH (FT):
BOREHOLE CONDITIONS MUD TYPE:
MUD DENSITY (LB/G):
MUD VISCOSITY (S) :
MUD PH:
MUD CHLORIDES (PPM):
FLUID LOSS (C3):
RESISTIVITY (OHMS) AT TEMPERATURE (DEGF)
MUD AT'MEASURED TEMPERATURE (MT):
MUD AT MAX CIRCULATING TERMPERATURE:
MUD FILTRATE AT MT:
MUD CAKE AT MT:
NEUTRON TOOL
MATRIX:
MATRIX DENSITY:
HOLE CORRECTION (IN):
TOOL STANDOFF (IN) :
EWR FREQUENCY (HZ) :
REMARKS:
$
Data Format Specification Record
Data Record Type .................. 0
Data Specification Block Type ..... 0
Logging Direction ................. Down
Optical log depth units ........... Feet
Data Reference Point .............. Undefined
Frame Spacing ..................... 60 .liN
Max frames per record ............. Undefined
15-DEC-97
MSC 1.32
NGP 5.74, DEP 2.21, PCD
MEMORY
12125.0
12101.0
12125.0
58.5
61.9
TOOL NUMBER
NGP SPC 282
3.750
3.8
FLO- PRO
8.90
.0
9.2
6.0
.000
.000
.000
.000
68.0
.3
Absent value .................... ~.-999.25
Depth Units .......................
Datum Specification Block sub-type...0
Name Service Order Units Size Nsam Rep Code Offset Channel
DEPT FT 4 1 68 0 1
GR MWD 6 AAPI 4 1 68 4 2
ROP MWD 6 FT/H 4 1 68 8 3
First
Name Min Max Mean Nsam Reading
DEPT 12073.5 12125 12099.2 104 12073.5
GR 27.08 58.51 37.2044 50 12073.5
ROP 54.42 791.03 102.533 49 12101
Last
Reading
12125
12098
12125
First Reading For Entire File .......... 12073.5
Last Reading For Entire File ........... 12125
File Trailer
Service name ............. STSLIB.007
Service Sub Level Name...
Version Number ........... 1.0.0
Date of Generation ....... 98/01/14
Maximum Physical Record..65535
File Type ................ LO
Next File Name ........... STSLIB.008
\
Physical EOF
File Header
Service name ............. STSLIB.008
Service Sub Level Name...
Version Number ........... 1.0.0
Date of Generation ....... 98/01/14
Maximum Physical Record..65535
File Type ................ LO
Previous File Name ....... STSLIB.007
Comment Record
FILE HEADER
FILE NUMBER: 8
RAW MWD
Curves and log header data for each bit run in separate files.
BIT RUN NUMBER: 7
DEPTH INCREMENT: .5000
FILE SUMMARY
VENDOR TOOL CODE
ROP
GR
$
LOG HEADER DATA
DATE LOGGED:
START DEPTH STOP DEPTH
12098.5 12103.5
12125.5 12129.5
18-DEC-97
SOFTWARE
SURFACE SOFTWARE VERSION:
DOWNHOLE SOFTWARE VERSION:
6.90
DATA TYPE (MEMORY OR REAL-TIME):
TD DRILLER (FT):
TOP LOG INTERVAL (FT):
BOTTOM LOG INTERVAL (FT):
BIT ROTATING SPEED (RPM):
HOLE INCLINATION (DEG
MINIMUM ANGLE:
MAXIMUM ANGLE:
TOOL STRING (TOP TO BOTTOM)
VENDOR TOOL CODE TOOL TYPE
NGP NATURAL GAMMA PROBE
$
BOREHOLE AND CASING DATA
OPEN HOLE BIT SIZE (IN):
DRILLER'S CASING DEPTH (FT):
BOREHOLE CONDITIONS MUD TYPE:
MUD DENSITY (LB/G):
MUD VISCOSITY (S):
MUD PH:
MUD CHLORIDES (PPM):
FLUID LOSS (C3):
RESISTIVITY (OHMM) AT TEMPERATURE (DEGF)
MUD AT MEASURED TEMPERATURE (MT):
MUD AT MAX CIRCULATING TERMPERATURE:
MUD FILTRATE AT MT:
MUD CAKE AT MT:
NEUTRON TOOL
MATRIX:
MATRIX DENSITY:
HOLE CORRECTION (IN):
TOOL STANDOFF (IN):
EWR FREQUENCY (HZ):
REMARKS:
$
Data Format Specification Record
Data Record Type .................. 0
Data Specification Block Type ..... 0
Logging Direction ................. Down
Optical log depth units ........... Feet
Data Reference Point .............. Undefined
Frame Spacing ..................... 60 .liN
Max frames per record ............. Undefined
Absent value ...................... -999.25
Depth Units .......................
Datum Specification Block sub-type...0
MSC 1.32
NGP 5.74, DEP 2.21, PCD
MEMORY
12130.0
12125.0
12130.0
57.8
58.5
TOOL NUMBER
NGP SPC 223
3.750
3.8
FLO-PRO
8.90
.0
9.0
6.6
.000
.000
.000
.000
79.7
.3
Name Service Order Units Size Nsam Rep Code Offset Channel
DEPT FT 4 1 68 0 1
ROP MWD 7 FT/H 4 1 68
GR MWD 7 AAPI 4 1 68
Name Min Max Mean Nsam
DEPT 12098.5 12129.5 12114 63
ROP 48.89 64.06 53.3844 9
GR 34.86 52.88 40.4945 11
First
Reading
12098.5
12125.5
12098.5
Last
Reading
12129.5
12129.5
12103.5
First Reading For Entire File .......... 12098.5
Last Reading For Entire File ........... 12129.5
File Trailer
Service name ............. STSLIB.008
Service Sub Level Name...
Version Number ........... 1.0.0
Date of Generation ....... 98/01/14
Maximum Physical Record..65535
File Type ................ LO
Next File Name ........... STSLIB.009
Physical EOF
Tape Trailer
Service name ............. LISTPE
Date ..................... 98/01/14
Origin ........... ........ STS
Tape Name ................ UNKNOWN
Continuation Number ...... 01
Next Tape Name ........... UNKNOWN
Comments ................. STS LIS Writing Library.
Technical Services
Reel Trailer
Service name ............. LISTPE
Date ..................... 98/01/14
Origin ................... STS
Reel Name ................ UNKNOWN
Continuation Number ...... 01
Next Reel Name ........... UNKNOWN
Comments ................. STS LIS Writing Library.
Technical Services
Scientific
Scientific
Physical EOF
Physical EOF
End Of LIS File