Department of Commerce, Community, and Economic Development
Alaska Oil and Gas Conservation
Commission
HOME
EVENTS
DATA
Data List
Drilling
Production
Orders
Data Miner
Document Search
REPORTS
Reports and Charts
Pool Statistics
FORMS
LINKS
Links
Test Notification
Data Requests
Regulations
Industry Guidance Bulletins
How to Apply
ABOUT US
History
Staff
HELP
Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
219-115
H:\Processing temp\2024-05-20_22606_CRU_CD4-594_InjectionProfile_Transmittal.docx DELIVERABLE DISCRIPTION Ticket # Field Well # API # Log Description Log Date 22606 CRU CD4-594 50-103-20807-00 Injection Profile 20-May-24 DELIVERED TO Company & Address DIGITAL FILE # of Copies LOG PRINTS # of Prints CD’s # of Copies 1 AOGCC Attn: Natural Resources Technician 333 W. 7th Ave., Suite 100 Anchorage, Ak. 99501-3539 Delivered By: CPAI Sharefile ______________________________ _____________________________________ Date received Signature ______________________________ ______________________________________ PLEASE RETURN COPY VIA EMAIL TO: DIANE.WILLIAMS@READCASEDHOLE.COM READ CASED HOLE, INC., 4141 B STREET, SUITE 308, ANCHORAGE, AK 99503 PHONE: (907)245-8951 E-MAIL : READ-Anchorage@readcasedhole.com WEBSITE : WWW.READCASEDHOLE.COM 219-115 T38873 Gavin Gluyas Digitally signed by Gavin Gluyas Date: 2024.06.05 08:42:13 -08'00' C:\Users\grgluyas\AppData\Local\Microsoft\Windows\INetCache\Content.Outlook\I1OGWE08\2024-05-18_22605_CRU_CD4-594_CoilFlag_Transmittal (002).docx DELIVERABLE DISCRIPTION Ticket # Field Well # API # Log Description Log Date 22605 CRU CD4-594 50-103-20807-00 Coil Flag 18-May-24 DELIVERED TO Company & Address DIGITAL FILE # of Copies LOG PRINTS # of Prints CD’s # of Copies 1 AOGCC ***API number has been corrected on the transmittal and .las file*** Attn: Natural Resources Technician 333 W. 7th Ave., Suite 100 Anchorage, Ak. 99501-3539 Delivered By: CPAI Sharefile ______________________________ _____________________________________ Date received Signature ______________________________ ______________________________________ PLEASE RETURN COPY VIA EMAIL TO: DIANE.WILLIAMS@READCASEDHOLE.COM READ CASED HOLE, INC., 4141 B STREET, SUITE 308, ANCHORAGE, AK 99503 PHONE: (907)245-8951 E-MAIL : READ-Anchorage@readcasedhole.com WEBSITE : WWW.READCASEDHOLE.COM 219-115 T38873 Gavin Gluyas Digitally signed by Gavin Gluyas Date: 2024.06.05 08:41:55 -08'00' MEMORANDUM State of Alaska Alaska Oil and Gas Conservation Commission DATE:Tuesday, March 5, 2024 SUBJECT:Mechanical Integrity Tests TO: FROM:Bob Noble P.I. Supervisor Petroleum Inspector NON-CONFIDENTIAL ConocoPhillips Alaska, Inc. CD4-594 COLVILLE RIV UNIT CD4-594 Jim Regg InspectorSrc: Reviewed By: P.I. Suprv Comm ________ JBR 03/05/2024 CD4-594 50-103-20807-00-00 219-115-0 W SPT 4007 2191150 1500 835 835 835 835 389 405 405 405 4YRTST P Bob Noble 1/21/2024 30 MinPretestInitial15 Min Well Name Type Test Notes: Interval P/F Well Permit Number: Type Inj TVD PTD Test psi API Well Number Inspector Name:COLVILLE RIV UNIT CD4-594 Inspection Date: Tubing OA Packer Depth 1270 2250 2195 2190IA 45 Min 60 Min Rel Insp Num: Insp Num:mitRCN240124190218 BBL Pumped:2.1 BBL Returned:2 Tuesday, March 5, 2024 Page 1 of 1 1 Regg, James B (OGC) From:NSK DHD Field Supervisor <n2238@conocophillips.com> Sent:Tuesday, June 13, 2023 7:37 PM To:Regg, James B (OGC); DOA AOGCC Prudhoe Bay; Brooks, Phoebe L (OGC); Wallace, Chris D (OGC) Cc:WNS Integrity Subject:CPAI 10-426 form for Non-witnessed shut in tests on CD4-213, 306, 322 and 594 on 6/13/23 Attachments:MIT CRU CD4-213,306,322 & 594 SI TESTS 06-13-23.xlsx Please see the attached 10‐426 form for Non‐witnessed shut in MIT‐IA’s that were performed at CD4 pad on 6/13/23. Please let me know if you have any questions or concerns. Thank you, Shelby Sumrall / Bruce Richwine DHD Field Supervisor ConocoPhillips Alaska, Inc. Office phone: (907) 659‐7022 Cell phone: (907) 943‐0167 CAUTION: This email originated from outside the State of Alaska mail system. Do not click links or open attachments unless you recognize the sender and know the content is safe. CRU CD4-594PTD 2191150 Submit to: OPERATOR: FIELD / UNIT / PAD: DATE: OPERATOR REP: AOGCC REP: Well Pressures:Pretest Initial 15 Min.30 Min.45 Min.60 Min. PTD 2120050 Type Inj N Tubing 3 330 320 315 Type Test P Packer TVD 7291 BBL Pump 3.8 IA 3 3320 3260 3245 Interval 4 Test psi 1823 BBL Return 3.8 OA 89 98 98 98 Result P Well Pressures:Pretest Initial 15 Min.30 Min.45 Min.60 Min. PTD 2070940 Type Inj N Tubing 295 400 410 405 Type Test P Packer TVD 6898 BBL Pump 2.7 IA 90 3300 3200 3180 Interval 4 Test psi 1725 BBL Return 2.7 OA 0 0 0 0 Result P Well Pressures:Pretest Initial 15 Min.30 Min.45 Min.60 Min. PTD 2071010 Type Inj N Tubing 280 575 605 605 Type Test P Packer TVD 7161 BBL Pump 4.5 IA 295 3300 3260 3255 Interval V Test psi 3000 BBL Return 4.4 OA 42 68 68 68 Result P Well Pressures:Pretest Initial 15 Min.30 Min.45 Min.60 Min. PTD 2191150 Type Inj N Tubing 300 335 305 300 Type Test P Packer TVD 4007 BBL Pump 3.6 IA 365 2020 1950 1930 Interval 4 Test psi 1500 BBL Return 3.5 OA 291 314 314 313 Result P Well Pressures:Pretest Initial 15 Min.30 Min.45 Min.60 Min. PTD Type Inj Tubing Type Test Packer TVD BBL Pump IA Interval Test psi BBL Return OA Result TYPE INJ Codes TYPE TEST Codes INTERVAL Codes Result Codes W = Water P = Pressure Test I = Initial Test P = Pass G = Gas O = Other (describe in Notes)4 = Four Year Cycle F = Fail S = Slurry V = Required by Variance I = Inconclusive I = Industrial Wastewater O = Other (describe in notes) N = Not Injecting ConocoPhillips Alaska Inc, Alpine / CRU / CD4 PAD Miller 06/13/23 Notes:Tubing plug set at 11,931' MD. Notes: CD4-213B CD4-306 CD4-594 Notes: CD4-322 Notes:MITIA to maximum anticipated injection pressure per AIO 18C.005 Notes: STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMMISSION Mechanical Integrity Test jim.regg@alaska.gov;AOGCC.Inspectors@alaska.gov;phoebe.brooks@alaska.gov chris.wallace@alaska.gov Form 10-426 (Revised 01/2017)2023-0613_MIT_CRU_CD4-pad_4wells jbr CAUTION:This email originated from outside of the organization. Do not click links or open attachments unless you recognize the sender and know the content is safe. CAUTION: This email originated from outside the State of Alaska mail system. Do not click links or open attachments unless you recognize the sender and know the content is safe. From:Ballantine, Tab A (LAW) To:Price, Jeremy M (OGC); Chmielowski, Jessie L C (OGC); Seamount, Dan T (OGC); Guhl, Meredith D (OGC) Subject:Fw: [EXTERNAL]Colville Unit wells CRU CD4-595 and CRU CD4-594 Date:Friday, January 7, 2022 11:12:15 AM FYI. No claim of confidentiality. From: Donley, Kevin (LDZX) <Kevin.Donley@conocophillips.com> Sent: Thursday, January 6, 2022 3:37 PM To: Ballantine, Tab A (LAW) <tab.ballantine@alaska.gov> Cc: Evans, John R (LDZX) <John.R.Evans@conocophillips.com> Subject: RE: [EXTERNAL]Colville Unit wells CRU CD4-595 and CRU CD4-594 You don't often get email from kevin.donley@conocophillips.com. Learn why this is important Tab, thanks for the note, and happy new year. John asked that I respond on this, as we have had a change of assignments and I am going to handle the well confidentiality matters going forward. On your note below, you are correct, ConocoPhillips Alaska, Inc. (CPAI) has not appealed the DNR’s denial of our application for extended confidentiality on the CD4-594 and CD4-595 wells. CPAI is in agreement that there are no confidentiality constraints that would prevent the AOGCC from treating the CD4-594 and CD4-595 data as public on the timeline you set forth below. We really appreciate you checking in with us to confirm we have the same understanding. Please let me know if you have any questions. Thanks, Kevin. From: Ballantine, Tab A (LAW) <tab.ballantine@alaska.gov> Sent: Thursday, January 6, 2022 10:56:58 AM To: Evans, John R (LDZX) <John.R.Evans@conocophillips.com> Subject: [EXTERNAL]Colville Unit wells CRU CD4-595 and CRU CD4-594 Good morning John, AOGCC requested that I reach out to seek clarification / agreement from CPAI regarding confidentiality of information on two Colville River Unit wells, CD-594 and CD-595. Although well information on both was originally confidential, according to AOGCC records, the confidentiality period on CD-595 expired in June, 2021. The confidentiality on CD-594 expires January 16, 2022. My understanding is that DNR denied CPAI's request for extended confidentiality on October 26, 2021, the same day it denied extended confidentiality regarding the NPRA wells. Although CPAI filed an administrative appeal in superior court regarding the NPRA wells, AOGCC has not seen anything indicating that an appeal of DNR's decision regarding the Colville River Unit wells has been filed. As a result, AOGCC intends to treat the information regarding CD-595 as public and will do likewise on January 16, 2022 with the information on CD-594. Let me know if CPAI agrees with AOGCC's understanding. Thanks, Tab Confidentiality Notice: This e-mail, along with any attachments, may be proprietary, privileged, confidential, or otherwise legally exempt from disclosure, and it is intended exclusively for the individual or entity to which it is addressed. Any dissemination, copying, use of, or reliance upon such information by or to anyone other than addressee is prohibited. If you are not the named addressee, please notify the sender immediately by reply e-mail and delete all copies of this e-mail message and any attachments. From:Heusser, Heather A (DNR) To:Guhl, Meredith D (OGC) Cc:Frank, Kevin J (DNR) Subject:RE: ConocoPhillips Appeal? CRU CD4-595 and CRU CD4-594 Date:Wednesday, January 5, 2022 7:05:52 AM Meredith, Here is the word from DOL: …the two CD5-595 & 594 wells are no longer covered by confidentiality, the Department decision is final, and we are good to go to tell AOGCC to release the data according to their normal process. For the five wells covered in the other letter, (Stony Hill, Tinmiaqs, & West Willow) they are subject to appeal (AK case no. 3AN-21-09171CI). These wells should continue to be held confidential during the pendency of the litigation. I was asked to share the above with you. Sounds consistent with what you planned to do. Thank you, Heather From: Heusser, Heather A (DNR) Sent: Tuesday, January 4, 2022 2:44 PM To: Guhl, Meredith D (OGC) <meredith.guhl@alaska.gov> Cc: Frank, Kevin J (DNR) <Kevin.Frank@alaska.gov> Subject: RE: ConocoPhillips Appeal? CRU CD4-595 and CRU CD4-594 Hi, I heard back from Sean. He said the appeal CPAI filed with Superior Court last week only names the wells on NPRA land, so the CD4 wells are clear for AOGCC to release the data. I’m waiting to hear back if I may forward the appeal to you. From skimming though it I suspect it may be the one you already have. Heather From: Guhl, Meredith D (OGC) <meredith.guhl@alaska.gov> Sent: Tuesday, January 4, 2022 2:19 PM To: Heusser, Heather A (DNR) <heather.heusser@alaska.gov> Cc: Frank, Kevin J (DNR) <kevin.frank@alaska.gov> Subject: RE: ConocoPhillips Appeal? CRU CD4-595 and CRU CD4-594 Hi Heather, The link doesn’t take me anywhere specific. The filing that was forwarded to me was specific to the Stony Hill 1, West Willow 1, and Tinmiaq 7-9 NPRA wells, and does not mention the CRU CD4 wells. I think the CRU CD4 wells are getting lost in the shuffle since both letters were issued the same day. I just left a message with Tab Ballantine to follow up, he never got back to me yesterday on whether I could forward the filing to you, so hopefully I hear something. Meredith Meredith Guhl (she/her) Petroleum Geology Assistant Alaska Oil and Gas Conservation Commission 333 W. 7th Ave, Anchorage, AK 99501 meredith.guhl@alaska.gov Direct: (907) 793-1235 CONFIDENTIALITY NOTICE: This e-mail message, including any attachments, contains information from the Alaska Oil and Gas Conservation Commission (AOGCC), State of Alaska and is for the sole use of the intended recipient(s). It may contain confidential and/or privileged information. The unauthorized review, use or disclosure of such information may violate state or federal law. If you are an unintended recipient of this e-mail, please delete it, without first saving or forwarding it, and, so that the AOGCC is aware of the mistake in sending it to you, contact Meredith Guhl at 907-793-1235 or meredith.guhl@alaska.gov. From: Heusser, Heather A (DNR) <heather.heusser@alaska.gov> Sent: Tuesday, January 4, 2022 2:13 PM To: Guhl, Meredith D (OGC) <meredith.guhl@alaska.gov> Cc: Frank, Kevin J (DNR) <kevin.frank@alaska.gov> Subject: RE: ConocoPhillips Appeal? CRU CD4-595 and CRU CD4-594 Hi Meredith, Sorry, for the lag. I was told CPAI filed a suit against DNR on December 27 (link). I haven’t heard back yet if they have asked the suit affects the CD4 wells or just the NPRA wells—or if it’s for another issue. I’ll ping our director’s office again. In short keep holding them confidential. Heather From: Guhl, Meredith D (OGC) <meredith.guhl@alaska.gov> Sent: Monday, January 3, 2022 7:25 AM To: Heusser, Heather A (DNR) <heather.heusser@alaska.gov> Cc: Frank, Kevin J (DNR) <kevin.frank@alaska.gov> Subject: RE: ConocoPhillips Appeal? CRU CD4-595 and CRU CD4-594 Good Morning Heather, Wondering if CPAI has filed in Superior Court regarding the two CRU wells? Happy New Year! Meredith Meredith Guhl (she/her) Petroleum Geology Assistant Alaska Oil and Gas Conservation Commission 333 W. 7th Ave, Anchorage, AK 99501 meredith.guhl@alaska.gov Direct: (907) 793-1235 CONFIDENTIALITY NOTICE: This e-mail message, including any attachments, contains information from the Alaska Oil and Gas Conservation Commission (AOGCC), State of Alaska and is for the sole use of the intended recipient(s). It may contain confidential and/or privileged information. The unauthorized review, use or disclosure of such information may violate state or federal law. If you are an unintended recipient of this e-mail, please delete it, without first saving or forwarding it, and, so that the AOGCC is aware of the mistake in sending it to you, contact Meredith Guhl at 907-793-1235 or meredith.guhl@alaska.gov. From: Heusser, Heather A (DNR) <heather.heusser@alaska.gov> Sent: Saturday, December 18, 2021 10:54 AM To: Guhl, Meredith D (OGC) <meredith.guhl@alaska.gov> Cc: Frank, Kevin J (DNR) <kevin.frank@alaska.gov> Subject: RE: ConocoPhillips Appeal? CRU CD4-595 and CRU CD4-594 Good morning Meredith, There was an appeal filed and denied by the Commissioner’s Office which set the clock back. They now have until close of business the Monday after Christmas (12/27) to file in superior Court. They are expected to file. I’ll set myself a calendar reminder for the day after to check if they did file. Heather Ann Heusser Natural Resource Specialist IV State of Alaska Department of Natural Resources Division of Oil and Gas 550 West 7th Avenue, Suite 1100 Anchorage AK 99501-3560 heather.heusser@alaska.gov From: Guhl, Meredith D (OGC) <meredith.guhl@alaska.gov> Sent: Friday, December 17, 2021 8:40 AM To: Frank, Kevin J (DNR) <kevin.frank@alaska.gov>; Heusser, Heather A (DNR) <heather.heusser@alaska.gov> Subject: ConocoPhillips Appeal? CRU CD4-595 and CRU CD4-594 Good Morning Kevin and Heather, Has ConocoPhillips Alaska appealed the October 26, 2021 decision by Commissioner Feige regarding the two Colville River Unit exploratory wells, CRU CD4-595 and CRU CD4-594? If CPAI has not filed an appeal, AOGCC will release CRU CD4-595, PTD 218-123, as it was due for release after June 22, 2021. CRU CD4-594, PTD 219-115, will remain confidential until the release date of January 16, 2022, to fulfill the 30 days + 24 months after well completion. Thank you, Meredith Meredith Guhl (she/her) Petroleum Geology Assistant Alaska Oil and Gas Conservation Commission 333 W. 7th Ave, Anchorage, AK 99501 meredith.guhl@alaska.gov Direct: (907) 793-1235 CONFIDENTIALITY NOTICE: This e-mail message, including any attachments, contains information from the Alaska Oil and Gas Conservation Commission (AOGCC), State of Alaska and is for the sole use of the intended recipient(s). It may contain confidential and/or privileged information. The unauthorized review, use or disclosure of such information may violate state or federal law. If you are an unintended recipient of this e-mail, please delete it, without first saving or forwarding it, and, so that the AOGCC is aware of the mistake in sending it to you, contact Meredith Guhl at 907-793-1235 or meredith.guhl@alaska.gov. Department of Natural Resources OFFICE OF THE COMMISSIONER 550 West 7th Avenue, Suite 1400 Anchorage, AK 99501-3561 Main: 907.269-8431 Fax: 907-269-8918 October 26, 2021 John F. Schell, Jr. Vice President; Strategy, Commercial, BD & Land ConocoPhillips Alaska P.O. Box 100360 Anchorage, AK 99510-0360 John.Schell@conocophillips.com SENT VIA EMAIL Re: Commissioner’s Response; June 17, 2021, Request for Extended Confidentiality of Well Data for CD4-595 and CD4-594 Wells Dear Mr. Schell: On June 17, 2021, the Department of Natural Resources (“DNR”) Commissioner’s Office (“Office”) received a letter from ConocoPhillips Alaska (“CPAI”) requesting the DNR Commissioner notify the Alaska Oil and Gas Conservation Commission (“AOGCC”) that the DNR recognizes and affirms that well data provided to AOGCC for the CD4-595 and CD4-594 wells should be accorded extended confidential treatment under Alaska law, unless and until such indefinite confidentiality is waived by the lessee.1 Your letter described that this data contributes to an understanding of the regional Brookian Top Set play, potential business developments of CPAI, and competitive exploration prospects. You also identified that there is unleased acreage within five miles of the wells, and leases owned by several other companies. You have requested a finding under AS 31.05.035(c) and 11 AAC 83.153(a) as to whether “the commissioner of natural resources finds the required reports and information contain significant information relating to the valuation of unleased land in the same vicinity.”2 Your request is denied for the following reasons. The distance from the wells to the nearest unleased land is more than three miles. (See attached Exhibit A for geographic context). Thus, under 11 AAC 83.153, the Commissioner may, as a matter of discretion to support the interests of the State, extend confidentiality if CPAI is able to make “a sufficient showing that the reports or information contain significant information relating to the valuation of unleased land beyond the three-mile radius.”3 CPAI’s request for extended confidentiality for the wells is denied under AS 31.05.035 as implemented by 11 AAC 83.153 because CPAI failed to make a sufficient showing that the reports or information contain 1 CPAI also asserted other alleged bases for confidentiality, however, this Office makes no conclusions regarding these arguments. 2 AS 31.05.035(c). 3 11 AAC 83.153(a). Commissioner’s Response, Extended Well Confidentiality October 26, 2021 Page 2 of 4 significant information relating to the valuation of unleased land beyond the three-mile radius of the CD4-494 and CD4-495 wells. Specifically, the information pertained to the general exploration trends and interests of CPAI and similarly situated companies, to the general geology of Brookian Top Set play, and to the valuation of adjacent areas that are currently under lease. The information did not provide the necessary unique or specific information about specific unleased acreage in the vicinity of the wells. As will be discussed below, there are only small unleased areas, not within three miles of the wells, that CPAI itself implicitly determined was not commercially valuable despite possession of the information from the wells. The 24 month statutory confidentiality period under AS 31.05.035(c) serves to protect and preserve the exploration and leasehold development interests identified by CPAI that stem from other leases being held in the vicinity of the relative acreage, and the general exploration interest in the play type. Extended confidentiality is appropriate in some circumstances where there are exogenous events and unleased acreage in the vicinity of a well, but an operator does not have occasion to make competitive use of information they have gathered during the 24 month period. In this context, and regardless of this information’s materiality to valuation of acreage beyond the three mile radius, extended confidentiality is not in the State’s interest because the prior lessee, CPAI, of the nearest available acreage failed to produce from this acreage and maintain it beyond its primary term. The unleased land 4 that is 4.93 miles from the slightly more proximal CD5-595 well was segregated from a lease that was part of the Colville River Unit and expired in October 2020 when, CPAI, as then-lessee, failed to maintain the lease beyond its primary term.5 While 11 AAC 83.153(b)(2) does not directly address lands beyond three miles, the regulation provides that when lands within three miles are offered for lease and receive no bids, extended confidentiality will not be provided. Providing extended confidentialy in situations where lands even further than three miles were held by the same entity seeking confidentiality and have had no production activities despite being leased would only be appropriate in the narrowest of circumstances, if any. CPAI’s failure to previously maintain the lease on this unleased land further supports that it is fully consistent with the State’s interests and the proper exercise of the Commissioner’s discretion to deny CPAI’s request for extended confidentiality.6 Furthermore, a tract 7 just to the west of the above described acreage, approximately 10 miles from the slightly more proximal CD5-595 well (See attached Exhibit B), was available in the 2010 NPR-A lease sale and subsequent sales, including BLM’s most recent NPR-A lease sale in 4 Township 10 North, Range 4 East, Sections 7, 15-19, 30, and 31, Umiat Meridian. 5 See BLM Case File AA-095318. 6 Per 11 AAC 83.153(b)(2), extended confidentiality requests will not be granted when unleased lands within a three-mile radius of the well at issue receive no bids in a competitive lease sale (implicitly a sale occurring within the original statutory 24 month confidentiality period). While this regulation specifically applies to unleased lands within three miles of the well, a collarly rationale applies to justify denying an extended confidentiality request for a well with unleased lands beyond the three-mile radius that the applicant itself allowed to expire. Particularly when the Commissioner has the discretion to do so. See 11 AAC 83.153(a) (The commissioner will, in his or her discretion, extend confidentiality…from a well located more than three miles from any unleased lands…”). 7 The tract was most recently referred to as H-176 by the BLM in the 2019 lease sale, but is generally described as Sections 25 & 36 of Township 10 N, Range 3E, Umiat Meridian Commissioner’s Response, Extended Well Confidentiality October 26, 2021 Page 3 of 4 December 2019, and has received no bids.8 The fact that CPAI could have bid on this acreage but did not further weighs against any exercise of discretionary extension of confidentiality. Stay Provision: This decision not to grant extended confidentiality for the well data is stayed until the time allotted CPAI to appeal to Superior Court has run. As such, AOGCC is instructed not to remove the confidentiality of the well data until such time. Reconsideration Provision: A person aggrieved by this decision may request reconsideration in accordance with 11 AAC 02. Any reconsideration request must be received within twenty (20) days of issuance of this decision. If no request has been filed within the 20-day period, this decision becomes the final decision of DNR on the 21st day, at which point this decision is the final administrative order and decision of DNR for the purpose of an appeal to Superior Court within 30 days. If a reconsideration request is filed within the 20-day period, and the Commissioner fails to take action on that request within 30 calendar days of issuance of this decision, the decision becomes the final decision of DNR on the 31st day, at which point this decision is the final administrative order and decision of DNR for the purpose of an appeal to Superior Court within 30 days. The request for reconsideration may be mailed or delivered to the DNR Commissioner, DNR Commissioner’s Office, 550 W. 7th Avenue, Suite 1400, Anchorage, Alaska, 99501; or sent by electronic mail to dnr.appeals@alaska.gov. Under 11 AAC 02.030, appeals and requests for reconsideration filed under 11 AAC 02 must be accompanied by the fee established in 11 AAC 05.160(d)(1)(F), which has been set at $200 under the provisions of 11 AAC 05.160(a-b). An appellant who has standing under Alaska law may appeal to Superior Court in accordance with the Alaska Rules of Court and to the extent permitted by applicable law. DNR does not waive its right to assert any defenses in the event a party with standing files an appeal to Superior Court, including, but not limited to a failure to exhaust administrative remedies defense in the event a motion for reconsideration to the Commissioner does not precede the appeal to Superior Court. Sincerely, Corri A. Feige Commissioner cc: Dr. Sara Longan, Deputy Commissioner 8 See generally NPR-A Lease Sale Documents available at https://www.blm.gov/programs/energy-and-minerals/oil- and-gas/leasing/regional-lease-sales/alaska. Commissioner’s Response, Extended Well Confidentiality October 26, 2021 Page 4 of 4 Erik Fossum, Director of Appeals & Policy Implementation Tom Stokes, Director, Division of Oil & Gas John Ptacin, Department of Law AOGCC Commissioners Chmielowski, Seamount, and Price c/o Samantha Carlisle, Executive Assistant Grace Salazar, AOGCC Special Assistant &&T. 12 N. R. 3 E. T. 11 N. R. 3 E. T. 10 N. R. 3 E. T. 12 N. R. 4 E. T. 11 N. R. 4 E. T. 10 N. R. 4 E. T. 12 N. R. 5 E. T. 11 N. R. 5 E. T. 10 N. R. 5 E. T. 12 N. R. 6 E. T. 11 N. R. 6 E. T. 10 N. R. 6 E. T. 9 N. R. 3 E. T. 9 N. R. 4 E. T. 9 N. R. 5 E.T. 9 N. R. 6 E. 25 36 Pikka Colville River Greater Mooses Tooth CD4 Pad 4.93 mi State of Alaska, Esri, HERE, Garmin, SafeGraph, METI/NASA, USGS, EPA, NPS, USDA, Esri, USGS Exhibit A: Colville River Unit CD4-594 and CD4-595 Vicinity Map Township Unit Boundary State oil and gas lease Non-state lease BLM Lease AKAA 95318 (Expired October 2020) Sections 25 and 36 CD4 Pad Well bottomhole location CD4-594 CD4-595 Three-mile buffer from bottomhole location CD4-594 CD4-595 &&Distance from bottomhole location to unleased land 0 1.5 3 4.5 60.75 Miles &&T. 12 N. R. 3 E. T. 11 N. R. 3 E. T. 10 N. R. 3 E. T. 12 N. R. 4 E. T. 11 N. R. 4 E. T. 10 N. R. 4 E. T. 12 N. R. 5 E. T. 11 N. R. 5 E. T. 10 N. R. 5 E. T. 12 N. R. 6 E. T. 11 N. R. 6 E. T. 10 N. R. 6 E. T. 9 N. R. 3 E. T. 9 N. R. 4 E. T. 9 N. R. 5 E.T. 9 N. R. 6 E. 25 36 Pikka Colville River Greater Mooses Tooth CD4 Pad 9.42 mi State of Alaska, Esri, HERE, Garmin, SafeGraph, METI/NASA, USGS, EPA, NPS, USDA, Esri, USGS Exhibit B: Colville River Unit CD4-594 and CD4-595 Vicinity Map Township Unit Boundary State oil and gas lease Non-state lease BLM Lease AKAA 95318 (Expired October 2020) Sections 25 and 36 CD4 Pad Well bottomhole location CD4-594 CD4-595 Three-mile buffer from bottomhole location CD4-594 CD4-595 &&Distance from bottomhole location to Sections 25 and 36 0 1.5 3 4.5 60.75 Miles ConocoPhilli s p Alaska June 17, 2021 VIA EMAIL Corri Feige, Commissioner Alaska Department of Natural Resources (DNR) State of Alaska 550 W. 7th Avenue, Suite 1400 Anchorage, Alaska 99501 corri.feige@alaska.Rov Re: Request for Extended Confidentiality of Well Data for the CD4-595 and CD4-594 Wel Is Dear Commissioner Feige, John F. Schell, Jr. Vice President Strategy, Commercial, BD & Land P. O. Box 100630 Anchorage, AK 99510-0360 Office: 907-265-6022 Fax: 907-263-4966 john.schell@conocophillips.com I am writing to request that the Department of Natural Resources (DNR) notify the Alaska Oil and Gas Conservation Commission (AOGCC), in accordance with the procedures set forth in AS 31.05.035(c), that DNR recognizes and affirms that well data (Well Data) provided to the AOGCC for the CD4-595 well' and the CD4-594 well' (collectively, the Wells) should be accorded extended confidential treatment under Alaska law, unless and until such extended confidentiality is waived by the lessee. Confidentiality for the Well Data is provided for under State law. As you are aware, for wells on state and private land, the AOGCC keeps exploratory well data confidential for 24 months after the 30-day filing period for the reports and information. AS 31.05.035(c) This period may be extended if the DNR Commissioner determines that the well data contains "significant information relating to the valuation of unleased land in the same vicinity." Id. In addition, the Well Data should be maintained as confidential as it meets the definition of a trade in AS 45.50.940(3), and, consequently, is protected by the Alaska Constitution. See, State, DNR v. ASRC, 834 P.2d 134 (Alaska 1991). The Well Data for these wells contributes to an understanding of the regional Brookian Top Set play. Significantly, the Well Data pertains directly to potential business developments for the CPAI lease tracts over that play. In addition, the regional Brookian Top Set play has been a competitive exploratory focus for multiple operators on the North Slope, and the Wells sit within a five -mile radius of unleased acreage, as well as acreage owned by four distinct lease owners, including CPAI. As a result, this Well data is highly competitively sensitive. Attachment 1 to this letter shows the leased and unleased acreage position and the locations of the Wells. For the foregoing reasons, we request that the Commissioner notify the AOGCC, in accordance with the procedures set forth in AS 31.05.035(c), that DNR recognizes and affirms that Well Data provided to the AOGCC for the Wells should be accorded extended confidentiality, unless and until such confidentiality is waived by the lessee. I API No. 50103207780000. 2 API No. 50103208070000. By copy of this letter to the AOGCC Commissioners, CPAI requests that the AOGCC continue to hold the Well Data confidential, consistent with long-standing AOGCC policy, pending a final determination by the DNR Commissioner or a court, as applicable. If the AOGCC does not intend to maintain the Well Data as confidential, we request that the AOGCC promptly notify the under -signed in writing at the address first given above, so that we may seek appropriate injunctive relief, as irreparable harm would result from public release of the Well Data. Sincerely, Vol A6 a W46 John F. Schell, Jr. Vice President Strategy, Commercial, BD & Land CC (Via Email): AOGCC Commissioners Chmielowski, Seamount, and Price c/o Samantha Carlisle, Executive Assistant (samantha.carlisle@alaska.sov) Jody Colombie, AOGCC Special Assistant (iody.colombie@alaska.gov) Dr. Sara Longan, Deputy DNR Commissioner (sara.longan@alaska.gov) Tom Stokes, Director, DNR Division of Oil and Gas (tom.stokes@alaska.gov) Dominic Miocevic, ConocoPhillips, Manager, Alaska Exploration Attachment ATTACHMENT 1 LOCATION MAP + • ConocoPhillipsr ALPINE 18 i Alas -a NEVE 1 C134-696 and C134-694 Wells ,••. COWDEffrIAL 6116/2021 j I NANUQ3 NANUKI NANUK 2 [ : � I COLVILLE RIVER UNIT ;`r_�NANUQ 5. % CLOVER A �r•.w —I BERGSCHRUND2PIKKA UNIT _ PUTU 21 • PUTU 2A -- -- 40FKAT-.113 • _. _ GREATER MOOSES TOOTH �— UNIT 1 2 0 Miles ,i,•""•, TOFKAT1•� TOFKAT-1A� r i r i B ST1 —PIKKA B Unleased Industry Leases CPAI Leases �L _...:. NPPA munits State of Alaska CONFIDENTIAL DATA SUBMITTAL COMPLIANCE REPORT 4/10/2020 Permit to Drill 2191150 Well Name/No. COLVILLE RIV UNIT CD4-594 pB 1- Operator ConocoPhillips Alaska, Inc. MD 21170 TVD 4178 Completion Date 12/16/2019 Completion Status 1WINJ Current Status 1WINJ REQUIRED INFORMATION API No. 50-103-20807-00-00 UIC Yes Supplied by OP Supplied by OP Mud Log N2 Samples NO Directional Survey Yes - -- - DATA INFORMATION List of Logs Obtained: GR/RES/DEN/NEU/CALIPER/POR/FORM IMG/DEEP RES/SONIC/NMR/FORM PRESS/CMT EVAL Well Log Information: Log/ Electr Data Digital Dataset Log Log Run Interval OH / Type Med/Frmt Number Name Scale Media No Start StopReceived CH a (from Master Well Data/Logs) Comments ED C 31931 Digital Data 14491 11424 1/16/2020 Electronic Data Set, Filename: CPAI_CD4- 594_12-DEC-2019_M EMORY SCMT MAIN30FPMUP PSP 021PUP.las ED C 31931 Digital Data 143 2842 1/16/2020 Electronic Data Set, Filename: CD4- 594_Sco pe_Service_R M_LW D001.1as ED C 31931 Digital Data 2748 10267 1/16/2020 Electronic Data Set, Filename: CD4- 594_Scope_Service_R M_LW D002.las ED C 31931 Digital Data 10181 14774 1/16/2020 Electronic Data Set, Filename: CD4- 594_Scope_Service_R M_LW D004.las ED C 31931 Digital Data 14581 21121 1/16/2020 Electronic Data Set, Filename: CD4- 594_Scope_Se rvice_R M_LWD005.las ED C 31931 Digital Data 106 21170 1/16/2020 Electronic Data Set, Filename: CD4-594_Scope Service RM.las ED C 31931 Digital Data 1/16/2020 Electronic File: CPAI_CD4-594_12-DEC- 2019 MEMORY SCMT_MAIN30FPMUP_021PUC.DLIS ED C 31931 Digital Data 1/16/2020 Electronic File: CPAI_CD4-594_12-DEC- 2019 MEMORY SCMT FIELD PRINT.PDF ED C 31931 Digital Data 1/16/2020 Electronic File: CD4-594 NAD27 EOW Compass Surveys.pdf ED C 31931 Digital Data 1/16/2020 Electronic File: CD4-594 NAD27 EOW Compass Surveys [Canvas].txt ED C 31931 Digital Data 1/16/2020 Electronic File: CD4-594 NAD27 EOW Compass Surveys [Macro].txt ED C 31931 Digital Data 1/16/2020 Electronic File: CD4-594 NAD27 EOW Compass Surveys [Petrel].txt AOGCC Page 1 of 9 Friday, April 10, 2020 DATA SUBMITTAL COMPLIANCE REPORT 4/10/2020 Permit to Drill 2191150 Well Name/No. COLVILLE RIV UNIT CD4-594 Operator ConocoPhillips Alaska, Inc. API No. 50-103-20807-00-00 MD 21170 TVD 4178 Completion Date 12/16/2019 Completion Status 1WINJ Current Status 1WINJ UIC Yes ED C 31931 Digital Data 1/16/2020 Electronic File: CD4-594 NAD27 EOW Compass Surreys [Surveys].txt ED C 31931 Digital Data 1/16/2020 Electronic File: CD4-594 NAD83 EOW Compass Surveys.pdf ED C 31931 Digital Data 1/16/2020 Electronic File: CD4-594 NAD83 EOW Compass Surveys [Canvas].txt ED C 31931 Digital Data 1/16/2020 Electronic File: CD4-594 NAD83 EOW Compass Surveys [Macro].txt ED C 31931 Digital Data 1/16/2020 Electronic File: CD4-594 NAD83 EOW Compass Surveys [Petrel].txt ED C 31931 Digital Data 1/16/2020 Electronic File: CD4-594 NAD83 EOW Compass Surveys [Surveys].txt ED C 31931 Digital Data 1/16/2020 Electronic File: CD4- 594_Scope_Service_2M D_RM.pdf ED C 31931 Digital Data 1/16/2020 Electronic File: CD4- 594_Scope_Service_2TVD_R M. Pdf ED C 31931 Digital Data 1/16/2020 Electronic File: CD4- 594_Scope_Service_5M D_R M . pdf ED C 31931 Digital Data 1/16/2020 Electronic File: CD4- 594_Scope_Service_5TVD_RM. Pdf ED C 31931 Digital Data 1/16/2020 Electronic File: CD4-594PH1 VISION Service RM LWD001.dlis ED C 31931 Digital Data 1/16/2020 Electronic File: CD4-594PH1—VISION Service RM LWD001.html ED C 31931 Digital Data 1/16/2020 Electronic File: CD4-594PH1—VISION Service RM LWD002.diis ED C 31931 Digital Data 1/16/2020 Electronic File: CD4-594PH1—VISION Service RM LWD002.html ED C 31931 Digital Data 1/16/2020 Electronic File: CD4-594PH1 VISION Service _RM_LWD002_Reaming.dlis ED C 31931 Digital Data 1/16/2020 Electronic File: CD4-594PH1 VISION Service _RM_LWD002_Reaming.html ED C 31931 Digital Data 1/16/2020 Electronic File: CD4- 594_ EcoScope_Service_Dri I I i ng Pass RM LWD004 Limestone.dlis AOGCC Page 2 of 9 Friday, April 10, 2020 DATA SUBMITTAL COMPLIANCE REPORT 4/10/2020 Permit to Drill 2191150 Well Name/No. COLVILLE RIV UNIT CD4-594 Operator ConocoPhillips Alaska, Inc. API No. 50-103-20807-00-00 MD 21170 TVD 4178 Completion Date 12/16/2019 Completion Status 1 WINJ Current Status 1 WINJ UIC Yes ED C 31931 Digital Data 1/16/2020 Electronic File: CD4- 594_EcoSco pe_Service_Dri I ling Pass RM LWD004 Limestone.html ED C 31931 Digital Data 1/16/2020 Electronic File: CD4- 594_EcoScope_Service Drilling Pass RM LWD004 Sandstone.dlis ED C 31931 Digital Data 1/16/2020 Electronic File: CD4- 594_ EcoScope_Service_Dril ling Pass RM LWD004 Sandstone.html ED C 31931 Digital Data 1/16/2020 Electronic File: CD4- 594_ EcoScope_Service_Reaming Pass RM LWD004 Limestone.dlis ED C 31931 Digital Data 1/16/2020 Electronic File: CD4- 594 EcoScope_Service_Reaming Pass RM LWD004 Limestone.html ED C 31931 Digital Data 1/16/2020 Electronic File: CD4- 594_EcoScope_Service_Reaming Pass RM LWD004 Sandstone.dlis ED C 31931 Digital Data 1/16/2020 Electronic File: CD4- 594_ EcoScope_Service_Reaming Pass RM LWD004 Sandstone.html ED C 31931 Digital Data 1/16/2020 Electronic File: CD4-594 Scope Service RM LWD005 Limestone.dlis ED C 31931 Digital Data 1/16/2020 Electronic File: CD4-594 Scope Service RM LWD005 Limestone.html ED C 31931 Digital Data 1/16/2020 Electronic File: CD4-594_Scope Service RM LWD005 Sandstone.dlis ED C 31931 Digital Data 1/16/2020 Electronic File: CD4-594_Scope Service RM LWD005 Sandstone.htmI ED C 31931 Digital Data 1/16/2020 Electronic File: CD4-594_Scope Service_RM.dlis ED C 31931 Digital Data 1/16/2020 Electronic File: CD4-594_Scope Service_RM.html ED C 31932 Digital Data 0 14799 1/16/2020 Electronic Data Set, Filename: CD4-594 PH1.las ED C 31932 Digital Data 1/16/2020 Electronic File: CD4-594 Geological Summary.doc ED C 31932 Digital Data 1/16/2020 Electronic File: CD4-594 PH1.txt ED C 31932 Digital Data 1/16/2020 Electronic File: StripLog - CD4-594 PH1.pdf AOGCC Page 3 of 9 Friday, April 10, 2020 DATA SUBMITTAL COMPLIANCE REPORT 4/10/2020 Permit to Drill 2191150 Well Name/No. COLVILLE RIV UNIT C134-594 Operator ConocoPhillips Alaska, Inc. API No. 50-103-20807-00-00 MD 21170 TVD 4178 Completion Date 12/16/2019 Completion Status 1WINJ Current Status 1WINJ UIC Yes ED C 31932 Digital Data 1/16/2020 Electronic File: StripLog - CD4-594.pdf ED C 31933 Digital Data 10208 14713 1/16/2020 Electronic Data Set, Filename: CD4- 594PH1 VISION Service RM LWD003.las ED C 31933 Digital Data 143 2842 1/16/2020 Electronic Data Set, Filename: CD4- 594PH1 VISION Service RM LWD001.1as ED C 31933 Digital Data 2748 10267 1/16/2020 Electronic Data Set, Filename: CD4- 594PH1 VISION Service RM LWD002.las ED C 31933 Digital Data 143 14746 1/16/2020 Electronic Data Set, Filename: CD4- 594PH1 VISION Service RM.las ED C 31933 Digital Data 1/16/2020 Electronic File: CD4-594PH1_VISION Service _RM_LWD003_Reaming_1.dlis ED C 31933 Digital Data 1/16/2020 Electronic File: CD4-594PH1_VISION Service RM LWD001 Alis ED C 31933 Digital Data 1/16/2020 Electronic File: CD4-594PH1_VISION Service RM LWD002.dlis ED C 31933 Digital Data 1/16/2020 Electronic File: CD4-594PH1_VISION Service_RM_LWD002_Reaming.dlis ED C 31933 Digital Data 1/16/2020 Electronic File: CD4-594PH1_VISION Service RM LWD003.dlis ED C 31933 Digital Data 1/16/2020 Electronic File: CD4-594PH1_VISION Service_RM_LWD003_Reaming.dlis ED C 31933 Digital Data 1/16/2020 Electronic File: CD4-594PH1_VISION Service_RM_(1).dlis ED C 31933 Digital Data 1/16/2020 Electronic File: CD4- 594PH 1 _EcoScope_I mage_Service_RM_5MD.pd f ED C 31933 Digital Data 1/16/2020 Electronic File: CD4- 594PH 1 _SAD N_I mage_Service_RM_5M D. pdf ED C 31933 Digital Data 1/16/2020 Electronic File: CD4- 594PH 1_VISION_Service_2MD_RM.pdf ED C 31933 Digital Data 1/16/2020 Electronic File: CD4- 594PH1 _VISION_Service_2TVD_RM.pdf ED C 31933 Digital Data 1/16/2020 Electronic File: CD4- 594PH1_VISION_Service_5MD_RM.pdf ED C 31933 Digital Data 1/16/2020 Electronic File: CD4- 594PH 1_VISION_Service_5TVD_RM.pdf AOGCC Page 4 of 9 Friday, April 10, 2020 DATA SUBMITTAL COMPLIANCE REPORT 4/10/2020 Permit to Drill 2191150 Well Name/No. COLVILLE RIV UNIT CD4-594 Operator ConocoPhillips Alaska, Inc. API No. 50-103-20807-00-00 MD 21170 TVD 4178 Completion Date 12/16/2019 Completion Status 1WINJ Current Status 1WINJ UIC Yes ED C 31933 Digital Data 1/16/2020 Electronic File: CD4-594PH1 NAD27 EOW Compass Surveys [Surveys].txt ED C 31933 Digital Data 1/16/2020 Electronic File: CD4-594PH1 NAD27 EOW Compass Surveys.pdf ED C 31933 Digital Data 1/16/2020 Electronic File: CD4-594PH1 NAD27 EOW Compass Surveys [Canvas].txt ED C 31933 Digital Data 1/16/2020 Electronic File: CD4-594PH1 NAD27 EOW Compass Surveys [Macro].txt ED C 31933 Digital Data 1/16/2020 Electronic File: CD4-594PH1 NAD27 EOW Compass Surveys [Petrel].txt ED C 31933 Digital Data 1/16/2020 Electronic File: CD4-594PH1 NAD83 EOW Compass Surveys [Petrel].txt ED C 31933 Digital Data 1/16/2020 Electronic File: CD4-594PH1 NAD83 EOW Compass Surveys [Surveys].txt ED C 31933 Digital Data 1/16/2020 Electronic File: CD4-594PH1 NAD83 EOW Compass Surveys.pdf ED C 31933 Digital Data 1/16/2020 Electronic File: CD4-594PH1 NAD83 EOW Compass Surveys [Canvas].txt ED C 31933 Digital Data 1/16/2020 Electronic File: CD4-594PH1 NAD83 EOW Compass Surveys [Macro].txt ED C 31942 Digital Data 57 6322 1/22/2020 Electronic Data Set, Filename: CD4- 594_CASTM_25NOV 19_P rocessed Log_V 1.las ED C 31942 Digital Data 57 6322 1/22/2020 Electronic Data Set, Filename: CD4- 594 CASTM 25NOV19 FieldData.las ED C 31942 Digital Data 0 6101 1/22/2020 Electronic Data Set, Filename: CD4- 594_CASTM_28OCT19_P rocessed Log_V 1.las ED C 31942 Digital Data -13 6101 1/22/2020 Electronic Data Set, Filename: CD4- 594_CASTM_28OCT19_Field Data.las ED C 31942 Digital Data 1/22/2020 Electronic File: CD4- 594_CASTM_25NOV 19_Processed Log_V 1.d lis ED C 31942 Digital Data 1/22/2020 Electronic File: CD4- 594_CASTM_25 NOV 19_Processed l-og_V 1. pdf ED C 31942 Digital Data 1/22/2020 Electronic File: CD4- 594_CASTM_25NOV 19_Processedl-og_V 1 _img.t iff ED C 31942 Digital Data 1/22/2020 Electronic File: CD4- 594_CASTM_25NOV19_Report_V 1.xlsx AOGCC Page 5 of 9 Friday, April 10, 2020 DATA SUBMITTAL COMPLIANCE REPORT 4/10/2020 Permit to Drill 2191150 Well Name/No. COLVILLE RIV UNIT C134-594 Operator ConocoPhillips Alaska, Inc. API No. 50-103-20807-00-00 MD 21170 TVD 4178 Completion Date 12/16/2019 Completion Status 1WINJ Current Status 1WINJ UIC Yes ED C 31942 Digital Data 1/22/2020 Electronic File: CD4- 594 CASTM 25NOV19 FieldData.dlis ED C 31942 Digital Data 1/22/2020 Electronic File: CD4- 594_CASTM_25NOV2019. pdf ED C 31942 Digital Data 1/22/2020 Electronic File: CD4- 594_CASTM_25 NOV2019_i mg.tiff ED C 31942 Digital Data 1/22/2020 Electronic File: CD4- 594_CASTM_28OCT19_ProcessedLog_V 1.d lis ED C 31942 Digital Data 1/22/2020 Electronic File: CD4- 594_CASTM_28OCT19_Processed Log_V1.pdf ED C 31942 Digital Data 1/22/2020 Electronic File: CD4- 594_CASTM_280CT19_ProcessedLog_V1 _img.t iff ED C 31942 Digital Data 1/22/2020 Electronic File: CD4- 594_CASTM_28OC T19_Report_V 1.xlsx ED C 31942 Digital Data 1/22/2020 Electronic File: CD4-594_CASTM_28OCT19.pdf ED C 31942 Digital Data 1/22/2020 Electronic File: CD4- 594 CASTM 28OCT19 FieldData.dlis ED C 31942 Digital Data 1/22/2020 Electronic File: CD4- 594_CASTM_28OCT19_i mg .tiff ED C 31991 Digital Data 0 21172 1/28/2020 Electronic Data Set, Filename: CD4- 594 Final Mud LAS.las ED C 31991 Digital Data 1/28/2020 Electronic File: CD5-594 EOWR.doc ED C 31991 Digital Data 1/28/2020 Electronic File: CD4-594_2MD_DEL_Final.emf ED C 31991 Digital Data 1/28/2020 Electronic File: CD4-594_2MD_DEL_Final.pdf ED C 31991 Digital Data 1/28/2020 Electronic File: CD4-594 2MD DEL Final.tif ED C 31991 Digital Data 1/28/2020 Electronic File: CD4-594 2MD FEL Final.emf ED C 31991 Digital Data 1/28/2020 Electronic File: CD4-594_ 2MD_ FEL_Final.pdf ED C 31991 Digital Data 1/28/2020 Electronic File: CD4-594 2MD FEL Final.tif ED C 31991 Digital Data 1/28/2020 Electronic File: CD4-594 2MD GRL Final.emf ED C 31991 Digital Data 1/28/2020 Electronic File: CD4-594_2MD_GRL_Final.pdf ED C 31991 Digital Data 1/28/2020 Electronic File: CD4-594 2MD GIRL Final.tif ED C 31991 Digital Data 1/28/2020 Electronic File: CD4-594 2TVD FEL Final.emf AOGCC Page 6 of 9 Friday, April 10, 2020 DATA SUBMITTAL COMPLIANCE REPORT 4/10/2020 Permit to Drill 2191150 Well Name/No. COLVILLE RIV UNIT CD4-594 Operator ConocoPhillips Alaska, Inc. MD 21170 TVD 4178 Completion Date 12/16/2019 ED C 31991 Digital Data ED C 31991 Digital Data ED C 31991 Digital Data ED C 31991 Digital Data ED C 31991 Digital Data ED C 31991 Digital Data ED C 31991 Digital Data ED C 31991 Digital Data ED C 31991 Digital Data ED C 31992 Digital Data ED C 31992 Digital Data ED C 31992 Digital Data ED C 31992 Digital Data ED C 31992 Digital Data ED C 31992 Digital Data ED C 31992 Digital Data ED C 31992 Digital Data ED C 31992 Digital Data ED C 31992 Digital Data ED C 31992 Digital Data ED C 31992 Digital Data ED C 31992 Digital Data ED C 31992 Digital Data API No. 50-103-20807-00-00 Completion Status 1 WINJ Current Status 1 WINJ UIC Yes 1/28/2020 Electronic File: CD4-594_2TVD_FEL_Final.pdf 1/28/2020 Electronic File: CD4-594_2TVD_FEL_Final.tif 1/28/2020 Electronic File: CD4-594_5MD_FEL_Final.emf 1/28/2020 Electronic File: CD4-594_5MD_FEL_Final.pdf 1/28/2020 Electronic File: CD4-594_5MD_FEL_Final.tif 1/28/2020 Electronic File: CD4-594_5TVD_FEL_Final.emf 1/28/2020 Electronic File: CD4-594_5TVD_FEL_Final.pdf 1/28/2020 Electronic File: CD4-594_5TVD_FEL_Final.tif 1/28/2020 Electronic File: CD4-594_lithdown.txt 105 14747 1/28/2020 Electronic Data Set, Filename: CD4- 594PH1 LAS Final.las 1/28/2020 Electronic File: CD4-594PH1_EWOR.doc 1/28/2020 Electronic File: CD4- 594PH1 2MD DEL Final.emf 1/28/2020 Electronic File: CD4- 594PH1_2MD_DEL_Final.pdf 1/28/2020 Electronic File: CD4-594PH1_2MD_DEL_Final.tif 1/28/2020 Electronic File: CD4- 594PH1 2MD FEL Final.emf 1/28/2020 Electronic File: CD4- 594PH 1_2MD_FEL_Final.pdf 1/28/2020 Electronic File: CD4-594PH1_2MD_FEL_Final.tif 1/28/2020 Electronic File: CD4- 594PH1 2MD GRL Final.emf 1/28/2020 Electronic File: CD4- 594PH1_2MD_GRL_Final.pdf 1/28/2020 Electronic File: CD4-594PH1_2MD_GRL_Final.tif 1/28/2020 Electronic File: CD4- 594PH1 2TVD FEL Final.emf 1/28/2020 Electronic File: CD4- 594PH 1_2TVD_FEL_Final.pdf 1/28/2020 Electronic File: CD4-594PH1_2TVD_FEL_Final.tif AOGCC Page 7 of 9 Friday, April 10, 2020 DATA SUBMITTAL COMPLIANCE REPORT 4/10/2020 Permit to Drill 2191150 Well Name/No. COLVILLE RIV UNIT C134-594 Operator ConocoPhillips Alaska, Inc. MD 21170 ED C ED C ED C ED C I ED C ED C i ED C ED C ED C ED C ED C ED C ED C ED C ED C ED C ED C ED C ED C API No. 50-103-20807-00-00 TVD 4178 Completion Date 12/16/2019 Completion Status 1 WINJ Current Status 1 WINJ UIC Yes 31992 Digital Data 1/28/2020 Electronic File: CD4- 594PH1 5MD FEL Final.emf 31992 Digital Data 1/28/2020 Electronic File: CD4- 594PH1_5MD_FEL_Final.pdf 31992 Digital Data 1/28/2020 Electronic File: CD4-594PH1_5MD_FEL_Final.tif 31992 Digital Data 1/28/2020 Electronic File: CD4- 594PH1_5MD_Show1_Final.emf 31992 Digital Data 1/28/2020 Electronic File: CD4- 594PH1_5MD_Show1_Final.pdf 31992 Digital Data 1/28/2020 Electronic File: CD4- 594PH1 5MD Show1 Final.tif 31992 Digital Data 1/28/2020 Electronic File: CD4- 594PH1 5MD Show2 Final.emf 31992 Digital Data 1/28/2020 Electronic File: CD4- 594PH1_5MD_Show2_Final.pdf 31992 Digital Data 1/28/2020 Electronic File: CD4- 594PH1 5MD Show2 Final.tif 31992 Digital Data 1/28/2020 Electronic File: CD4- 594PH1 5MD Show3 Final.emf 31992 Digital Data 1/28/2020 Electronic File: CD4- 594PH 1_5MD_Show3_Final.pdf 31992 Digital Data 1/28/2020 Electronic File: CD4- 594PH1 5MD Show3 Final.tif 31992 Digital Data 1/28/2020 Electronic File: CD4- 594PH1 5TVD FEL Final.emf 31992 Digital Data 1/28/2020 Electronic File: CD4- 594PH 1_5TVD_FEL_Final.pdf 31992 Digital Data 1/28/2020 Electronic File: CD4-594PH1_5MD_SH0W 1 _ 13630_ 13700' M D. pdf 31992 Digital Data 1/28/2020 Electronic File: CD4-594PH1_5MD_SH0W 2_13770_13830' M D. pdf 31992 Digital Data 1/28/2020 Electronic File: CD4-594PH1_5MD_SH0W 3_13885_13920'M D. pdf 31992 Digital Data 1/28/2020 Electronic File: CD4-594PH1_Show Report 1.pdf 31992 Digital Data 1/28/2020 Electronic File: CD4-594PH1_Show Report 2.pdf AOGCC Page 8 of 9 Friday, April 10, 2020 DATA SUBMITTAL COMPLIANCE REPORT 4/10/2020 Permit to Drill 2191150 Well Name/No. COLVILLE RIV UNIT CD4-594 Operator ConocoPhillips Alaska, Inc. API No. 50-103-20807-00-00 MD 21170 TVD 4178 Completion Date 12/16/2019 Completion Status 1WINJ Current Status 1WINJ UIC Yes ED C 31992 Digital Data 1/28/2020 Electronic File: C D4-594PH 1 _Show Report 3.pdf ED C 31992 Digital Data 1/28/2020 Electronic File: CD4-594PH1_lithdown.t)( Well Cores/Samples Information: —� Sample Interval Set Name Start Stop Sent Received Number Comments Cuttings 10300 21170 1/9/2020 1732 Cuttings 130 14746 2/28/2020 1733 Sample gap: 3810' - 3867' TVD INFORMATION RECEIVED Completion Report Directional / Inclination Data Q Mud Logs, Image Files, Digital Datal.J fA NA Core Chips Y / Production Test Information Y Mechanical Integrity Test Information Y / NA Composite Logs, Image, Data Files Q Core Photographs Y / Geologic Markers/Tops oY Daily Operations Summary0 Cuttings Samples O/ NA Laboratory Analyses Y /� COMPLIANCE HISTORY Completion Date: 12/16/2019 Release Date: 1/16/2022 Description Comments: Date Comments Compliance Reviewed By: y y Date. AOGCC Page 9 of 9 Friday, April 10, 2020 SAMPLE TRANSMITTAL TO: AOGCC DATE: February 27, 2020 333 WEST 7T" SUITE 100 AIR BILL: N/A ANCH. AK. 99501 CPAL 2019052001 2791433 CHARGE CODE: N/A OPERATOR: CPAI NAME: CD4-594 / 594PH1 SAMPLE TYPE: DRIES NUMBER OF BOXES: 16 Box SAMPLES SENT: CD4-594 l 7 -�3,4 CD4-594PH1 — 13 3452-4177 TVD 130-4723 TVD 10300-21170 MD 130-14746 MD This transmittal is being resent to reflect the fact that 12 samples were missing form CD4- 594PH1 with the original sample delivery. The delivery of the 12 samples, depth range 3867.75-4074 TVD, completes the set required by the AOGCC. SENT BY: M. McCRACKEN UPON RECEIPT OF THESE SAMPLES, PLEASE NOTE ANY DISCREPANCIES AND RETURN A SIGNED COPY OF THIS FORM TO: CONOCOPHILLIPS, ALASKA 700 G ST ATO-380 ANCHORAGE, AK. 99510 AT MIKE McCRACKEN Mik m Qacken@conocophillips.com RECEIVED: FEB 2 8 2020 AOGCC 7- r A TO: AOGCC 333 WEST 7T" SUITE 100 ANCH. AK. 99501 2791433 OPERATOR: CPAI SAMPLE TYPE: DRIES SAMPLES SENT: CD4-594 �OY-C 5 3452-4177 TVD 10300-21170 MD SAMPLE TRANSMITTAL ACC cc DATE: Jan 9, 2020 AIR BILL: N/A CPAI: 2019052001 CHARGE CODE: N/A CD4-594PH1 130-4723 TVD 130-14746 MD NAME: CD4-594 / 594PH1 NUMBER OF BOXES: # Box SENT BY: M. McCRACKEN UPON RECEIPT OF THESE SAMPLES, PLEASE NOTE ANY DISCREPANCIES AND RETURN A SIGNED COPY OF THIS FORM TO: CONOCOPHILLIPS, ALASKA 700 G ST ATO-380 ANCHORAGE, AK. 99510 ATTN: MIKE McCRACKEN Mike.mccracken@conocophillips.com RECEIVED: 15 Dominic Miocevic Manager, Alaska Exploration ConocoPhillips Alaska February 12, 2020 Mr. Jeremy Price, Commissioner Alaska Oil & Gas Conservation Commission 333 West 71h Avenue, Suite 100 Anchorage, Alaska 99501 Re: Authorization for Sample Review Dear Mr. Price: 700 G Street, ATO-2176 Anchorage, AK 99501-3448 Telephone 907.265.1665 Dom.J.Miocevic@conocophillips.com In my capacity as leader of ConocoPhillips' exploration operations in Alaska, reporting to Joe Marushack, President of ConocoPhillips Alaska, Inc., I am writing in response to Meredith Guhl's e-mail inquiry dated January 10, 2020 regarding potential missing CD4-594 PH1 cutting samples. authorize Mike McCracken, Geological Samples and Data Imaging Associate, and David Fison, Document and Records Management Coordinator, to review the confidential samples submitted to the AOGCC on January 9, 2020. They will seek to address any questions pertaining to the completeness of the data set with the understanding that AOGCC will allow Mike and David to view the samples and take notes so that we can resolve the outstanding issue as soon as possible. Sincerely, Dominic Miocevic Manager, Alaska Exploration RECEIVED FEB 2 5 2020 AOGCC MEMORANDUM TO: Jim Regg 7 P.I. Supervisor I\�q(Z�(ZvJ�i FROM: Brian Bixby Petroleum Inspector NON -CONFIDENTIAL State of Alaska Alaska Oil and Gas Conservation Commission DATE: Wednesday, February 26, 2020 SUBJECT: Mechanical Integrity Tests ConocoPhillips Alaska, Inc. CD4-594 COLVILLE RIV UNIT CD4-594 Src: Inspector Reviewed By: P.I. Supry Comm Well Name COLVILLE RIV UNIT CD4-594 API Well Number 50-103-20807-00-00 Inspector Name: Brian Bixby Permit Number: 219-115-0 Inspection Date: 2/25/2020 Insp Num: mitBDB200226062254 Rel Insp Num: Packer Depth Pretest Initial 15 Min 30 Min 45 Min 60 Min Well YPJ � aoo� _ r Tubing �� 196 - , 199 - 196 � 196 - PTD 2� 1 l so Type Test sPT TestDpst 1500 IA 1650 - 2390T2350 2345BBL Pumped: 1.6 BBL Returned: j 1.4 OA 356 4,a23 422 interval --- INITAL IP/F -� — P -- — -- -- Notes: Wednesday, February 26, 2020 Page 1 of 1 219115 Conoc6P"hilfips RECEWE® TRANSMITTAL JAN 28 2020 CONFIDENTIAL DATA FROM: Sandra D. Lemke, ATO-704 TO: Meredith Guhl AOGCC ConocoPhillips Alaska, Inc. AOGCC P.O. Box 100360 333 W. 71" Ave., Suite 100 Anchorage AK 99510-0360 Anchorage, Alaska 99501 RE: CD4-594PH1 CD4-594 Permit: 219-115 DATE: 01/28/2020 Transmitted: Colville River Unit II CD4-594PH 1_CD4-594 USB drive CD4-594 EOWR CD4-594_Final_LAS 3 1 99 1 CD4- 594_Fi n a l_Logs CD4-594_Lithology Download CD4-594PH1_E0WR CD4-594PH1 Final LAS I CD4-594PH1_Final_Logs 1-- 3 1 9 9 2 CD4-594PH1_Final_Show Reports- CD4-594PH1_Lithology Download Transmittal instructions: please promptly si n, scan, and e-mail to Sandra.Q.Lemkenaconocophil//ps.com CC: CD4-594fPH CD4-594 - e-transmittal well folder d Receipt: Date: 017ti'?�'o Alaska/IT-GGRE I Conpc�Phillips Alaska I Vffice: 907.265. 6947; Mobile 907. 440. 4512 l '0"' ConocoMili s TRANSMITTAL FROM: Sandra D. Lemke, ATO-704 TO: Steve Davies ConocoPhillips Alaska, Inc. AOGCC P.O. Box 100360 222 W. Th Ave., Suite 100 Anchorage AK 99510-0360 Anchorage, Alaska 99501 RE: CD4-594PH1_CD4-594 Permit: 219-115 DATE: 01/16/2020 Transmitted: Colville River Unit CD4-594PH 1_CD4-594 USB drive PW : Narwhal19 RECEIVED Name ]AN 16 2020 CD4-519a Schlumberger logs ._ _ AO G C C134-594PH_594_Wellsite Geological report CD4-594PH1_Schlumberger Lags > CD4-594_Schlumberger logs Name COP CD4-594 SCMT 12Decl9 FINAL CPAI CD4-594 Partner FINAL EO`W :D4-594_Schlumberger lags s COP_CD4-594_SCMT_12Dec19_FINAL Name Date modified 3 1 9 3 1 Customer HIS 12. 120,/2019 9:21 Customer LAS 12 16,'Hil9 '�:21 Field Print 1 [ �202 2:11 PP CD4-594_Schlumberger lags > CPAI_CD4-594_Partner_FINAL_EOW Name Date mcdified DLI:S Data 1 c,11 F'.r 201'9 7:1 LAS Data 1Ze"I8/2019 6:5, Log Data 12,1 ae'2019 6:5, Survey Data 1Y18/2019 6:4 CD4-594_PH1 (F:) s CD4-594PH_594_Wehsite Geological report Name 5B CD4-594 Geological Summary.doc CD4-594 PH1.1as CD4-594 PH1.txt x CD4-594.las StripLog - CD4-594 PH1.pdf StripLog - CD4-594.pdf CD4-594PH1_Schlumberger Logs blame CPAI CD4-594PH1 Partner FILIAL EO'IV CD4-594PH1_Schlumberger Logs � CPAI_CD4-594PH1_Partner_FINAL_EOW el Harne Date modified DLIS Data 11 /2EV2019 5:52 PM LAS Data 11 /26 2019 5:53 PM RX Log Data 11 r'26/'1 ;19 5:55 Plat Survey Data 11;26/2019 5:56 PM 3 193 2 3 193 3 Transmittal instructions: please promptly sign, scan, and e-mail to Sandra. D.Lemke(q)conocophi//ips.com CC: CD4-594PH C 4-594 - e-transmittal well folder / [2�A Receipt: I Date: OUR/W Alaska/IT-GGRE I Con coPhillips Alaska I Office: 907.265.6947; Mobile 907.440.4512 caNn-ENTIAL 219115 3 194 2 WELL LOG TRANSMITTAL #906069452 To: Alaska Oil and Gas Conservation Comm. Attn.: Natural Resource Technician 333 West 7th Avenue, Suite 100 Anchorage, Alaska 99501 RE: Pipe Inspection Analysis using CASTM: CD4-594 Run Date: 10/28/2019 and 11/25/2019 January 14, 2020 The technical data listed below is being submitted herewith. Please address any problems or concerns to the attention of: Fanny Sari, Halliburton Wireline & Perforating, 6900 Arctic Blvd., Anchorage, AK 99518 CD4-594 Digital Data in LAS format, Digital Log Image file 50-103-20807-00 j� 1 CD Rom C)r,, Leo PLEASE ACKNOWLEDGE RECEIPT BY SIGNING AND RETURNING A COPY OF THE TRANSMITTAL LETTER TO THE ATTENTION OF: Halliburton Wireline & Perforating Attn: Fanny Sari 6900 Arctic Blvd. Anchorage, Alaska 99518 Office: 907-275-2605 FRS—ANC@halliburton.com Date: 6�Iul200 Signed: STATE OF ALASKA ALA_ A OIL AND GAS CONSERVATION COW ,SION CONFIDENTIAL WELL COMPLETION OR RECOMPLETION REPORT AND LOG 1 a. Well Status: Oil ❑ Gas[] SPLUG ❑ Other ❑ Abandoned ❑ Suspended ❑ 1 b. Well Class: 20AAC 25.105 20AAC 25.110 Development ❑ Exploratory GINJ ❑ INJ� WAGE] WDSPL ❑ No. of Completions: Service L I Stratigraphic Test ❑ 2. Operator Na : ConocoPhillips Alaska, Inc. 6. Date Comp., Susp.,` r Aband.: 121#/'2019 14. Permit to Drill Number / Sundry: 219-115 ' 3. Address: 7. Date Spudded: 15. API Number: P.O. Box 100360 Anchorage, AK 99510-0360 10/3/2019 50-103-20807-00-00 4a. Location of Well (Governmental Section): 8. Date TD Reached: 16. Well Name and Number: Surface: 2853' FNL, 4915' FEL, Sec 19, Tl l N, R5E, UM 12/7/2019 CD4-594 " Top of Productive Interval: 9. Ref Elevations: KBA6.4 • 17. Field / Pool(s): 4235' FNL, 4200' FEL, Sec 28, T11N, R5E, UM GL: 19.0 • BF: EXPLORATORY Total Depth: 10. Plug Back Depth MD/TVD: 18. Property Designation: 4249' FNL, 1040' FEL, Sec 33, T11 N, R5E, UM 10,307/3,452 ADL 384211, ADL 380082, ADL 380081, ADL 391587 4b. Location of Well (State Base Plane Coordinates, NAD 27): 11. Total Depth MD/TVD: 19. DNR Approval Number: Surface: x- 378291 . y- 5957553 • Zone- 4 - 21170/4178 LONS 09-009 TPI: x- 389485 y- 5950719 Zone- 4 12. SSSV Depth MD/TVD: 20. Thickness of Permafrost MD/TVD: Total Depth: x- 392580 y- 5945380 Zone- 4 N/A 1257/1239 5. Directional or Inclination Survey: Yes 0 (attached) No ❑ 13. Water Depth, if Offshore: 21. Re-drill/Lateral Top Window M /TVD: Submit electronic and printed information per 20 AAC 25.050 N/A (ft MSL) N/A k�5F �> 22. Logs Obtained: List all logs run and, pursuant to AS 31.05.030 and 20 AAC 25.071, submit all electronic data and printed logs within 90 day of completion, suspension, or abandonment, whichever occurs first. Types of logs to be listed include, but are not limited to: mud log, spontaneous potential, gamma ray, caliper, resistivity, porosity, magnetic resonance, dipmeter, formation tester, temperature, cement evaluation, casing collar locator, jewelry, and perforation record. Acronyms may be used. Attach a separate page if necessary Surface: GR/Res Int 1 & Int 2: GR/Res/DEN/NEU/CALIPER Pilot Hole: GR/Res/DEN/NEU/POROSITY/FORMATION IMAGE/DEEP Res/Sonic/NMR/FORMATION PRESSURE Lateral: GR/Res/SONIC/DEEP Res/CEMENT EVALUATION (SC /K T (r„. � 1, �- � \ i c5J J 23. CASING, LINER AND CEMENTING RECORD CASING WT. PER FT GRADE SETTING DEPTH MD SETTING DEPTH TVD HOLE SIZE CEMENTING RECORD AMOUNT PULLED TOP BOTTOM TOP BOTTOM 20 154 X-65 29 107 27 107 42 Cemented to surface with 11yds 13 3/8 68 L-80 29 2835 29 2374 16 1366sx 15.8ppg, LiteCrete 359sx 15.8ppg, Class G 9 5/8 40 L-80 2663 10260 26 3447 12 1/ 4 760sx 15.8ppg Class G 7 26 L-80 26 14767 26 4058 8 3/4 253sx 13.Oppg Class G 117sx 15.8ppg Class G 41/2 12.6 L-80 14572 18509 4028 4322 61/8 Liner 24. Open to production or injection? Yes 0 No ❑ 25. TUBING RECORD If Yes, list each interval open (MD/TVD of Top and Bottom; Perforation SIZE DEPTH SET (MD) PACKER SET (MD/TVD) Size and Number; Date Perfd): 4 1/2 14580 14435/4007 FRAC SLEEVES @: 15666-15668 MD and 4194-4194 TVD 26. ACID, FRACTURE, CEMENT SQUEEZE, ETC. 16150-16152 MD and 4232-4232 TVD 16638-16640 MD and 4254-4255 TVD JAN 9 6 2020 17124-17127 MD and 4279 4279 TVD '0fJ'PLtTj()N Was hydraulic fracturing used during completion? Yes ❑ No FZ] Per 20 AAC 25.283 (i)(2) attach electronic and printed information DEPTH INTERVAL (MD) AMOUNT AND KIND OF MATERIAL USED 17572-17575 MD and 4289-4289 TVD A 18018-18020 MD and 4299-4299 TVD �(��lt�% 27. PRODUCTION TEST Date First Production: - ----- Method of Operation (Flowing, gas lift, etc.): N/A INJECTION ONLY -- NOT PRE -PRODUCED Date of Test: Hours Tested: Production for Oil-Bbl: Gas-MCF: Water-Bbl: Choke Size: Gas -Oil Ratio: Test Period Flow Tubing Casinq Press: Calculated Oil-Bbl: Gas-MCF: Water-Bbl: Oil Gravitv - API (corr): Press. 24-Hour Rate Or Form 10-407 Revised 5/2017� ��"l?"5 - ( I -' CONTINUED ON PAGE 2 RBDMS 1="" �qN 2 4 1 7-' ORIGINIAL orj�y� s � h 2'7 • Z-L�- (� 28. CORE DATA Conventional Core(s): Yes ❑ No El - Sidewall Cores: Yes ❑ No 0 - If Yes, list formations and intervals cored (MD/TVD, From/To), and summarize lithology and presence of oil, gas or water (submit separate pages with this form, if needed). Submit detailed descriptions, core chips, photographs, and all subsequent laboratory analytical results per 20 AAC 25.071. 29. GEOLOGIC MARKERS (List all formations and markers encountered): 30. FORMATION TESTS NAME MD TVD Well tested? Yes ❑ No El If yes, list intervals and formations tested, briefly summarizing test results. Permafrost - Top Surface Surface Permafrost - Base 1257 1239 Attach separate pages to this form, if needed, and submit detailed test Top of Productive Interval 14970 4091 information, including reports, per 20 AAC 25.071. Formation @ TPI -Narwhal K10 1973 1843 C40 2461 2180 C30 2936 2420 C20 4685 2741 K3 13435 3865 CD4-594PH1 TPI and Formation -Narwhal 13767 4084 K10 1973 1843 C40 2461 2180 C30 2936 2420 C20 4685 2741 K3 13363 3860 TD 14747 4724 TD 21170 4178 Formation at total depth: NARWHAL 31. List of Attachments: Daily Operations Summary, Definitive Survey, Cement Report, Schematic Information to be attached includes, but is not limited to: summary of daily operations, wellbore schematic, directional or inclination survey, core analysis, paleontolooical report, oroduction or well test results er 20 AAC 25.070. 32. I hereby certify that the foregoing is true and correct to the best of my knowledge. a Authorized Name: Chip Alvord Contact Name: Aaron Donat e Authorized Title: AJaska Drll' Manager Contact Email: aaron.dona co .com Authorized Contact Phone: 265-1089 1 Signature: Date: C141f INSTRUCTIONS General: This form and the required attachments pr9ide a complete and concise record for each well drilled in Alaska. Submit a well schematic diagram with each 10-407 well completion report and 10-404 well sundry report when the downhole well design is changed. All laboratory analytical reports regarding samples or tests from a well must be submitted to the AOGCC, no matter when the analyses are conducted. Item 1 a: Multiple completion is defined as a well producing from more than one pool with production from each pool completely segregated. Each segregated pool is a completion. Item 1 b: Well Class - Service wells: Gas Injection, Water Injection, Water -Alternating -Gas Injection, Salt Water Disposal, Water Supply for Injection, Observation, or Other. Item 4b: TPI (Top of Producing Interval). Item 9: The Kelly Bushing, Ground Level, and Base Flange elevations in feet above Mean Sea Level. Use same as reference for depth measurements given in other spaces on this form and in any attachments. Item 15: The API number reported to AOGCC must be 14 digits (ex: 50-029-20123-00-00). Item 19: Report the Division of Oil & Gas / Division of Mining Land and Water: Plan of Operations (LO/Region YY-123), Land Use Permit (LAS 12345), and/or Easement (ADL 123456) number. Item 20: Report measured depth and true vertical thickness of permafrost. Provide MD and TVD for the top and base of permafrost in Box 29. Item 22: Review the reporting requirements of 20 AAC 25.071 and, pursuant to AS 31.05.030, submit all electronic data and printed logs within 90 days of completion, suspension, or abandonment, whichever occurs first. Item 23: Attached supplemental records should show the details of any multiple stage cementing and the location of the cementing tool. Item 24: If this well is completed for separate production from more than one interval (multiple completion), so state in item 1, and in item 23 show the producing intervals for only the interval reported in item 26. (Submit a separate form for each additional interval to be separately produced, showing the data pertinent to such interval). Item 27: Method of Operation: Flowing, Gas Lift, Rod Pump, Hydraulic Pump, Submersible, Water Injection, Gas Injection, Shut-in, or Other (explain). Item 28: Provide a listing of intervals cored and the corresponding formations, and a brief description in this box. Pursuant to 20 AAC 25.071, submit detailed descriptions, core chips, photographs, and all subsequent laboratory analytical results, including, but not limited to: porosity, permeability, fluid saturation, fluid composition, fluid fluorescence, vitrinite reflectance, geochemical, or paleontology. Item 30: Provide a listing of intervals tested and the corresponding formation, and a brief summary in this box. Submit detailed test and analytical laboratory information required by 20 AAC 25.071. Item 31: Pursuant to 20 AAC 25.070, attach to this form: well schematic diagram, summary of daily well operations, directional or inclination survey, and other tests as required including, but not limited to: core analysis, paleontological report, production or well test results. Form 10-407 Revised 5/2017 Submit ORIGINAL Only CD4-594 Grass Roots Horizontal "Narwhal Lefty" Sand Injector ConocoPhillips Final Wellbore Schematic Conductor Installed: 20" set @ 107' MD / TVD 3.812" 1313 Nipple 9 5/8" x 13 3/8" Liner hanger: 2,662.9' MD' Surface Casing: 13-3/8" 68# L-80 TXPM 2,835.9' MD / 2,374.2' TVD Tubing: 14,579.6' 4-'/:" 12.6# L-80 HYD563 TOC @ 8,344' MD / 3,198' TVD Last Update: 01/15/19 AJD 16" Surface Hole 12-1/4" Intermediate 1 Hole 7" x 9 5/8" Liner hanger: 10,059.5' MD' Intermediate 1: 9 5/8" 40#, L80, TXPM @ 10,260.3' MD / 3,447.4' TVD 1 Z44 TOC @ 11,443' MD / 3,606.3' TVD ,,,t 8-3/4" Intermediate 2 Hole 3.813"xCM y 7" x 4-1 2" Permanent Packer 14 435.4' MD K-3 Sand Top: DHG 13,440' MD / 3,866' TVD 3.�s" os 4-1/2" x 7" ZXP Liner Top Packer 14,572.1' MD 4-1/2" x 7" Baker Flex Lock Liner hanger 6-1/8" Production Hole Intermediate 2: 10 7" 26#, L80, TXPM Narwhal Central Sand Top: @ 14,767' MD / 4,058.6' TVD Production TD: 14,972' MD / 4,089' TVD @ t 21,170' MD / 4,178.3' TVD QoB.161 Narwhal Lefty Sand Top: 3.687" DB CMD 15,614' MD / 4,186' TVD Production Liner: 4-1/2" 12.6# L-80 HYD563 14,572.1'-18,509' MD PerfJoint Perf Joint WELLBORE C014-594 WNS INJ WELLNAME CD4-594 1Q1TRAC.TnPFPA Well AttribuConocoPhillipsField Wellbo�e APWWI Alaska,Irc.r(5IDRn7M WINellbore NIPPLE I I ILAST WO: Act St. (ftKB) 54.99 21,170.0 Gird (ft) Rip Release Data 40 12/17/2119 HORIZONTAL, CD4-594, 111620206:33:25AM Last Tag Vertical schematic (actual) Annotation Depth (ftKB) I End Date Wellbore Last Mod By ............... ,.,...,..,,,,.„., ................... BARRIER -BPV; 23.4' LAST TAG: CD4-594 jennalt HANGER; 23.4- Last Rev Reason Annotation End Date Wellbore Last Mod By REV REASON: Exploration Well 1/9/2020 CD4-594 Ijennalt Casing Strings Casing Description OD (in) ID (in) Top (ftKB) Set Depth Set Depth (TVD) Wthen(L.. Grade Top Thread ................................................. ... CONDUCTOR 20 18.50 28.9 1 07 .0 107.0 154.19 X65 Welded Casing Description OD (In) ID gn) Top (ftKB) Set Depth (ftKB) Set Depth (TVD)... WVLen (I... Grade Top Thread SURFACE 13 3/8 12.42 29.5 2,835.9 2,374.2 68.00 L-80 TXP-BTC Casing Description OD (in) ID (in) Top (ftKB) Set Depth (ftKB) Set Depth (TVD)... WtlLen (L.. Grade Top Thread LINER 9.625" 9 5/8 8.84 2,662.9 10,260.3 3,447.4 40.00 L-80 TXP BTC Liner Details CONDUCTOR; 28.9-107.0 Annular Fluid- Diesel; 23.4- 1,500.P 12/11i2019 Annuar Fluid - Diesel; 25.7- Top (ftKB) Top (TVD) (ftKB) Top Inc[ r) kem Des Com Nominal ID (in) 2,662.9 2,289.2 58.99 HANGER 9-5/8" Liner Hanger 9 2,184.0, 11282019 Casing Description OD (in) ID (in) Top (ftKB) Set Depth (ftKB) Set Depth (ND)... WtlLen (I... Grade Top Thread TIE -BACK STRING 7" 7 I 6.28 26.5 10,065.9 3,422.E 26.00 L-801 TXP BTC INJ; 2,148.3 Casing Description OD (in) ID (in) I Top (ftKB) I Set Depth (ftKB) I Set Depth (TVD)... WtlLen (I... Grade I Top Thread LINER T' 7 I 6.28 10,059.5 14,767.0 4,058.6 26.00 L-80 TXP BTC Liner Details Nominal ID NIPPLE; 2,256.4 Top (ftKB) Top (TVD) (ftKB) Top Intl (') Item Des Com (in) Annular Fluid - Seawater; 7059.5 3,421.7 82.60 PACKER 7" Baker " HRDE" ZXP w/ HD Liner top packer 7.380 2. 84.0-2,806.0: 11/282019 10,081.4 3,424.61 82.62 HANGER 7" x 9-5/8" Baker Flex -Lock Liner Hanger 6.190 Casing Description OD (in) ID (in) Top (ftKB) Set Depth (ftKB) Set Depth (TVD)... WtlLen (I... Grade Top Thread LINER 4.5" 41/2 3.96 14,5721 18,509.0 4,322.3 12.60 L-80 H563 Liner Details Nominal ID Top (ftKB) Top (TVD) (ftKB) Top Incl (°) Item Des Co. (in) SURFACE; 29.5-2,835.9 Annular Fluid - S.tvater/ rmar. 14,572.1 4,028.5 81.10 PACKER Baker 'HRD-E" ZXP Liner Top Packer 4.330 14,595.3 4,032.1 81.15 HANGER Baker "Flex -Lock Liner Hanger 4.240 1,500.(,13,522.0; 11/122019 14,615.1 4,035.1 81.15 SBE Baker 80-40 Seal Bore Extension 4.020 14,633.4 4,037.9 81.14 XO Crossover Pup Joint 4-1/2" H521 pin x H563 pin 3.930 TIE -BACK STRING 7"; 28.5- REDUCING 10,065.9 15,610.0 4,186.0 81.75 PORT Camco Sliding Sleeve, 3.6871313 profile, down to 3.687 COLLAR open 15,665.6 4,194.0 81.73 FRAC SLEEVE Baker frac sleeve #6, .545" i.d. Pass-thru / 2.595" 2.545 W. No-go 16,150.3 4,231.8 88.28 FRAC SLEEVE Baker frac sleeve #5, 2.495" i.d. Pass-thru / 2.545" 2.495 W. No-go 16,637.7 4,254.3 86.34 FRAC SLEEVE Baker frac sleeve #4, 2.455" 7. Pass-thru / 2.495- 2.455 LINER 9.625"; 2.662.9-10,260.3 i.d. No-go 17,124.5 4,279.0 87.60 FRAC SLEEVE Baker frac sleeve #3, 2.415" i.d. Pass-thru / 2.455" 2.415 i.d. No-go Annular Flu-14, - S0; 12JM Bdna; 13,522.0.14,572.0; 12/12/2019 INJ; 14,195A 17,572.3 4,288.7 89.28 FRAC SLEEVE Baker frac sleeve #2, 2.375" i.d.Pass-thru / 2.415" A. No-go 2,375 18,017.9 4,299.0 86.72 FRAC SLEEVE Baker frac sleeve #1, 2.33T i.d. Pass-thru / . 75" 2.335 i.d. No-go SLIDING SLEEVE; 14,303.7 18,383.1 4,321.8 88.32 PERF TUBING 4-1/2" 12.6#, L-80,Hydril 563 Perforated Tubing 3.958 Tubing Strings GAUGEIPUMP SENSOR; Tubing Description String HORIZONTAL 4112 Ma... ID (in) Top 3.92 23.4 (ftKB) Set 14,579.7 Depth (ft.. Set 4,029.7 Depth (TVD) (... Wt (Ii Grade 12.60 L-80 Top Connection H563 14,368.9 INJECTION Completion Details PACKER; 14,435.4 Top (ftKB) Top (TVD) (ftKB) Top Inc, V Item Des Com Nominal ID (in) 23.4 23.4 0.00 HANGER FMC 4-1/2" Tubing Hanger 3.960 PLUG; 14,505.0 2,148.3 1,973.9 44.69 INJ 4-1/2 amco KBG-2 GLM w/ /D K 2-SOV (500 psi csg to tbg 'C 3.865 NIPPLE; 14,505.1 shear) 2,256.4 2,048.5 48.10 NIPPLE Landing Nipple, 4.5" X 3.812 DB 3.812 LOCATOR; 14,568.8 14,195.8 3,969.5 80.87 INJ 4-1/2" Camco KBG-2 GLM KB - GLM, w/DV, 12.6 # L-80, Hyd 3.865 14,303.7 3,986.E 80.87 SLIDING Sliding Sleeve, 4.5" X 3,813" X profile, Hyd 563, up to open 3.813 MULE SHOE; 14,578.7 SLEEVE 14,368.9 3,997.0 81.02 GAUGE/PUMP Schlumberger Solid Guage Mandrel w/ encapsulated I wire, 3.884 SENSOR 14,435.4 4,007.3 81.07 PACKER 4-1/2" x 7" Baker Premier Packer 3.890 14,506.1 4,018.2 81.04 NIPPLE Landing Nipple 4.5" X 3.75" DB W/dual flapper valve installed 3.750 14,568.8 41028.0 81.09 LOCATOR Shear Pinned Fluted No -Go Sub 3.970 14,578.7 4,029.5 81A1 MULE SHOE I Muleshoe WLEG 3.980 Other In Hole (Wireline retrievable plugs, valves, pumps, fish, etc.) LINER 7'; 10,059.5-14,767.0 Top (TVD) Top Intl Top (ftKB) (ftKB) (°) Des Com Run Date ID (in) 23.4 23.4 0.00 BARRIER - BPV Type H Back Pressure Valve 12/16/201 0.000 9 14,506.0 4,018.2 81.04 PLUG Dual flapper installed in the DB landing nipple. 1 161201 0.000 1 9 Mandrel Inserts at at! on N Top (ftKB) Top (TVD) (ftKB) Make Model OD (in) Valve Be, Type Latch Port Type Size lin) TRO Run (psi) Run Date Com 1 2,148.3 1,973.9 SLB Comp N2 1 GAS LIFT SOV BEK 12/16/2019 9-19 2 14,195.8 3,969.5 SLB Comp SN2084 1 GAS LIFT DMY BK 12/16/2019 9-05 i Notes: General & Safety End Date Annotation 1/9/2020 NOTE: REV REASON: WeliView Schematic w/ Alaska Schematic10.0 jrh LINER 4.5; 14,572.1-18,509.0 i R ♦ � � Cement Detail Report CD4-594 String: Conductor Cement Job: DRILLING ORIGINAL, 9/30/2019 14:00 Cement Details Description Conductor Cement Cementing Start Date 4/22/2014 09:00 Cementing End Date 4/22/2014 16:00 Wellbore Name CD4-594 Comment Cemented conductor in two stages: Stage #1--5 yards (Batch Mixed) Stage #2--6 yards (Batch Mixed) Cement Stages Stage # <Stage Number?> Description Conductor Cement Objective 1 Top Depth (ftKB) 29.5 Bottom Depth (ftKB) 107.0 Full Return? No Vol Cement... Top Plug? No Btm Plug? No Q Pump Init (bbl/m... Q Pump Final (bbl/... Q Pump Avg (bbl/... P Pump Final (psi) P Plug Bump (psi) Recip? No Stroke (ft) Rotated? No Pipe RPM (rpm) Tagged Depth (ftKB) Tag Method Depth Plug Drilled Out To (ftKB) Drill Out Diameter (in) Comment Cement Fluids & Additives Fluid Fluid Type Fluid Description Estimated Top (ftKB) Est Btm (ftKB) Amount (sacks) Class Volume Pumped (bbl) Yield (ft'/sack) Mix H2O Ratio (gal/sa... Free Water (%) Density (lb/gal) Plastic Viscosity (cP) Thickening Time (hr) CmprStr 1 (psi) Additives Additive Type Concentration I Conc Unit label Page 1/1 Report Printed: 1/16/2020 Cement Detail Report CD4-594 String: Surface Casing Cement Job: DRILLING ORIGINAL, 9/30/2019 14:00 Cement Details Description Cementing Start Date Cementing End Date Wellbore Name Surface Casing Cement 10/7/2019 23:00 10/8/2019 04:42 CD4-594 Comment Pump 5 bbls water, PT surface equip. @ 3500 psi, Pump 100 bbls of 10.3 ppg Mud Push. Drop Bottom plug. Mix & pump 464.9 bbls of 11.0 ppg of LiteCrete Lead cement followed by 74.2 bbls of 15.8 ppg class G cement.Pump 20 bbls fresh water, shut down & swap over to rig pump. Displace cement @ 8 bpm @ 600 psi, slow pumps to 3 bpm @ 3700 stks.Bbump plug @ 3917 stks, psi up 500 psi over FCP and hold 5 min. Bleed off & check floats. CIP @ 04:42 10/8/19. No losses during cement job. Good cement returns @ end of job. 429 bbls contaminated mud and cmt returned to surface. Cement Stages Stage # 1 Description Objective Top Depth (ftKB) Bottom Depth (ftKB) Full Return? Vol Cement... Top Plug? Btm Plug? Surface Casing Cement 29.5 2,835.3 No Yes Yes Q Pump Init (bbl/m... Q Pump Final (bbl/... Q Pump Avg (bbl/... P Pump Final (psi) P Plug Bump (psi) Recip? Stroke (ft) Rotated? Pipe RPM (rpm) 8 3 6 900.0 1,400.0 No I No I Tagged Depth (ftKB) Tag Method Depth Plug Drilled Out To (ftKB) Drill Out Diameter (in) Comment Pump 5 bbls water, PT surface equip. @ 3500 psi, Pump 100 bbls of 10.3 ppg Mud Push. Drop Bottom plug. Mix & pump 450 bbls of 11.0 ppg of LiteCrete Lead cement followed by 68 bbls of 15.8 ppg class G cement.Pump 20 bbls fresh water, shut down & swap over to rig pump. Displace cement @ 8 bpm @ 600 psi, slow pumps T/ 3 bpm @ 3700 stks. bump plug @ 3917 stks, psi up 500 psi over Fcp, hold 5 min. Bleed off & check floats. cmt in place @ 04:42 10/8/19. No losses during cmt job. got back 429 bbls contaminated mud and cmt. good cement returns @ end of job. Cement Fluids & Additives Fluid Fluid Type Fluid Description Estimated Top (ftKB) Est Btm (ftKB) Amount (sacks) Class Volume Pumped (bbl) Lead Cement 29.5 2,335.0 1,366 Litecrete 464.9 Yield (ft'/sack) Mix H2O Ratio (gallsa... Free Water (%) Density (lb/gal) Plastic Viscosity (cP) Thickening Time (hr) CmprStr 1 (psi) 1.91 6.69 15.80 210.1 5.08 Additives Additive Type Concentration Conc Unit label Fluid Fluid Type Fluid Description Estimated Top (ftKB) Est Btm (ftKB) Amount (sacks) Class Volume Pumped (bbl) Tail Cement 2,335.0 2,835.0 359 G 74.2 Yield (ft'/sack) Mix H2O Ratio (gal/sa... Free Water (%) Density (lb/gal) Plastic Viscosity (cP) Thickening Time (hr) CmprStr 1 (psi) 1.16 5.05 15.80 108.0 5.09 Additives Additive Type Concentration Conc Unit label Page 111 Report Printed: 1/16/2020 Cement Detail Report C D4-594 String: Liner Cement Job: DRILLING ORIGINAL, 9/30/2019 14:00 Cement Details Description Cementing Start Date Cementing End Date Wellbore Name Liner Cement 10/24/2019 12:15 10/24/2019 15:30 CD4-594 Comment Pumped 60 BBLS of 13.0 PPG Mud Push Pumped @ 4 BBLS PR/min, Drop the Bottom Dart, pump 157.1 BBLS OF 15.8 PPG of Class G Cement,Yield 1.16. Drop The Top Dart, Pump 10 BBLS of Fresh Water & Displace With 11 PPG LSND, The Bottom Plug bumped W/ 460 BBLS Pumped, The top Plug Bumped W/ 604.2 BBLS Pumped.Pressure up 500 Psi Over the FCP of 830 Psi. Hold 1330 Psi on the Floats for 5 Mins. Bleed of & checkThe Floats. CIP @ 1532 HRS. String was reciprocated throughout the job and no losses were observed. Cement Stages Stage # 1 Description Objective Top Depth (ftKB) Bottom Depth (ftKB) Full Return? Vol Cement... Top Plug. Btm Plug? Liner Cement 8,343.0 10,267.0 Yes 0.0 Yes Yes Q Pump Init (bbl/m... Q Pump Final (bbl/... Q Pump Avg (bbl/... P Pump Final (psi) P Plug Bump (psi) Recip? I Stroke (ft) Rotated? Pipe RPM (rpm) 4 3 3 17.0 608.0 Yes 20.00 No Tagged Depth (ftKB) Tag Method Depth Plug Drilled Out To (ftKB) Drill Out Diameter (in) Comment Cement Fluids & Additives Fluid Fluid Type Fluid Description Estimated Top (ftKB) Est Btm (ftKB) Amount (sacks) Class Volume Pumped (bbl) Intermediate Cement 8,343.0 10,267.0 760 G 157.1 Yield (ft'/sack) Mix H2O Ratio (gal/sa... Free Water (%) Density (lb/gal) Plastic Viscosity (cP) Thickening Time (hr) CmprStr 1 (psi) 1.16 5.07 15.80 199.8 5.50 Additives Additive Type Concentration Conc Unit label Page 111 Report Printed: 1/16/2020 . Cement Detail Report h^�` CD4-594 . ..• � T I o r i` 0 String: Cement Plug Job: DRILLING ORIGINAL, 9/30/2019 14:00 Cement Details Description Cement Plug Cementing Start Date 11/9/2019 22:00 Cementing End Date 11/9/2019 01:30 Wellbore Name CD4-594PH1 Comment Pump 5 bbls water, PT lines T/ 5000 psi. Mix and pump 40.2 bbls of 12ppg Mud Pudh 11, @ 2 bpm, Mix and pump 346 bbls of 13 ppg tail cement, shut down dropwiper dart. Swap to rig & displace with105.5 bbis of 10.5 ppg mud. Dart landed @ 1470 stks. psi up T/ 2380 BHKA tool sheared @ 2380 psi. FCP = 700 psi. Full returns throughout job.TOC was verified by tagging with abandonment string. TOC @ 10,721' MD, Cement Stages Stage # 1 Description Cement Plug Objective Abandon Pilot Hole Top Depth (ftKB) 10,690.0 Bottom Depth (ftKB) 14,747.0 Full Return. No Vol Cement... 43.0 Top Plug? Yes Btm Plug? Yes Q Pump [nit (bbl/m... 3 Q Pump Final (bbl/... 3 Q Pump Avg (bbl/... 3 P Pump Final (psi) P Plug Bump (psi) Recip? No Stroke (ft) Rotated? No Pipe RPM (rpm) Tagged Depth (ftKB) 10,721.0 Tag Method Tubing Depth Plug Drilled Out To (ftKB) Drill Out Diameter (in) Comment Cement Fluids & Additives Fluid Fluid Type Abandonment Cement Fluid Description Estimated Top (ftKB) 10,690.0 Est Btm (ftKB) 14,753.0 Amount (sacks) Class G Volume Pumped (bbl) Yield (ft'/sack) 1.99 Mix H2O Ratio (gal/sa... 10.92 Free Water (%) Density (lb/gal) 13.00 Plastic Viscosity (cP) 36.5 Thickening Time (hr) 4.65 CmprStr 1 (psi) Additives Additive Type Concentration Conc Unit label Fluid Fluid Type Spacer Fluid Description Estimated Top (ftKB) 14,753.0 Est Btm (ftKB) 14,753.0 Amount (sacks) Class Volume 1 Mud Push 2 40.0 Pumped (bbl) Yield (ft3/sack) Mix H2O Ratio (gal/sa... Free Water (%) Density (lb/gal) 12.00 Plastic Viscosity (cP) Thickening Time (hr) CmprStr 1 (psi) Additives Additive Type Concentration I Conc Unit label Stage # 2 Description Kick-off Plug Objective Kick off for Intermediate 2 Top Depth (ftKB) Bottom Depth (ftKB) Full Return? Vol No Cement... Top Plug? No Btm Plug? No Q Pump Init (bbl/m... Q Pump Final (bbl/... Q Pump Avg (bbF7fFP7ump Final (HPlug Bump (psi) Recip? No Stroke (ft) Rotated? NoTagged Pipe RPM (rpm) Depth (ftKB) Tag Method pth Plug Drilled Out To (ftKB) Drill Out Diameter (in) Comment Cement Fluids & Additives Fluid Fluid Type Fluid Description Estimated Top (ftKB) Est Btm (ftKB) Amount (sacks) Class Volume Pumped (bbl) Yield (ft'/sack) Mix H2O Ratio (gal/sa... Free Water (%) Density (lb/gal) Plastic Viscosity (0) Thickening Time (hr) CmprStr 1 (psi) Additives Additive Type Concentration Conc Unit label Page 1/1 Report Printed: 1/16/2020 Cement Detail Report C D4-594 String: Cement Plug Job: DRILLING ORIGINAL, 9/30/2019 14:00 Cement Details Description Cement Plug Cementing Start Date 11/11/2019 19:00 Cementing End Date 11/11/2019 21:00 Wellbore Name CD4-594PH1 Comment Mix and pump 38.7 BBL 13 PPG mud push II at 4 BPM. Mix and pump 63.6 BBL 17 PPG KOP cement at 4 BPM. Drop wiper ball. Pump 6.8 BBL 13 PPG mud push II at 4 BPM. Chase w/ 10 BBL water. Swap to rig pumps and displace w/ 80 BBL 10.5 PPG LSND (1144 stks @ 0.0699 BBL/stk / 807 psi FCP/ 22% FO). No losses observed during cement job. Cement Stages Stage # 1 Description Cement Plug Objective Top Depth (ftKB) 10,721.0 Bottom Depth (ftKB) 14,767.0 Full Return? No Vol Cement... Top Plug. No Btm Plug? No Q Pump Init (bbl/m... Q Pump Final (bbl/... Q Pump Avg (bbl/... P Pump Final (psi) P Plug Bump (psi) Recip? No Stroke (ft) Rotated? No I Pipe RPM (rpm) Tagged Depth (ftKB) Tag Method Depth Plug Drilled Out To (ftKB) Drill Out Diameter (in) Comment Cement Fluids & Additives Fluid Fluid Type Fluid Description Estimated Top (ftKB) Est Btm (ftKB) Amount (sacks) Class Volume Pumped (bbl) Yield (ft3lsack) Mix H2O Ratio (gal/sa... Free Water (%) Density (lb/gal) Plastic Viscosity (cP) Thickening Time (hr) CmprStr 1 (psi) Additives Additive Type Concentration Conc Unit label Page 1/1 ReportPrinted: 1/16/2020 Cement Detail Report C D4-594 Z- String: Liner Cement Job: Cement Details Description Liner Cement Cementing Start Date 11/24/2019 03:15 Cementing End Date 11/24/2019 06:15 Wellbore Name CD4-594 Comment Flood lines with water, pressure test lines to 4500 psi. SLB pump 40 bbl 12 ppg Mud Push @ 4 bpm, 930 psi, swap to 81.2 bbl 13.5 ppg G Cement @ 4 bpm initial 856 psi, followed by 28.1 bbls of 15.8 ppg class G tail cement w/ 1.16 ft3/100 yield at 4 bbls/min @ 700 psi. Chase with 20 bbls freshwater followed by 257 bbls 10 ppg LSND. Plug bumped on strokes. FCP = 1190. Increase to 2900 and hold 5 minutes. Bleed off, check floats. Floats holding. Cement Stages Stage # 1 Description Liner Cement Objective Top Depth (ftKB) 11,940.0 Bottom Depth (ftKB) 14,767.0 Full Return? Yes Vol Cement... 0.0 Top Plug? Yes Btm Plug? No Q Pump Init (bbl/m... Q 4 4 Pump Final (bbl/... Q Pump Avg (bbl/... 4 P Pump Final (psi) 1,190.0 P Plug Bump (psi) 2,900.0 Recip? 1 Yes Stroke (ft) 30.00 1 Rotated? Yes I Pipe RPM (rpm) Tagged Depth (ftKB) Tag Method Depth Plug Drilled Out To (ftKB) Drill Out Diameter (in) Comment 81.2 bbls Class G 13 ppg lead cement, yield 1.96 ft3/sx. Tail cement: 28.1 bbls Class G 15.8 ppg, yield 1.16 ft3/sx Cement Fluids & Additives Fluid Fluid Type Pre Flush Fluid Description Estimated Top (ftKB) 11,985.0 Est Btm (ftKB) 13,141.0 Amount (sacks) Class Volume Pumped (bbl) 40.0 Yield (ft'/sack) Mix H2O Ratio (gal/sa... Free Water (%) Density (lb/gal) 12.00 Plastic Viscosity (cP) Thickening Time (hr) CmprStr 1 (psi) Additives Additive Type Concentration I Cone Unit label Fluid Fluid Type Lead Cement Fluid Description Estimated Top (ftKB) 11,940.0 Est Btm (ftKB) 14,634.0 253 Amount (sacks) Class G Volume 81.2 Pumped (bbl) Yield (ft'/sack) 1.96 Mix H2O Ratio (gal/sa... 10.70 Free Water (%) Density (lb/gal) Plastic 13.00 47.0 Viscosity (cP) Thickening Time (hr) CmprStr 12.00 1 (psi) Additives Additive Type Concentration Cone Unit label Fluid Fluid Type Tail Cement Fluid Description Estimated Top (ftKB) 14,634.0 Est Btm (ftKB) Amount 14,767.0 117 (sacks) Class G Volume 28.1 Pumped (bbl) Yield (ft /sack) 1.16 Mix H2O Ratio (gal/sa... 5.14 Free Water (%) Density (lb/gal) Plastic 15.80 150.0 Viscosity (cP) Thickening Time (hr) CmprStr 5.02 1 (psi) Additives Additive Type Concentration Cone Unit label Page 1/1 Report Printed: 1/1612020 CD4-594PHI V.' Grass Roots "Narwhal Left of Lefty" Sand Pilot Hole ConocoPhillips Final Wellbore Schematic K-3 Sand Top: 13,336' MD / 3,860' TVD Narwhal Central Sand Top: 13,767' MD / 4,084' TVD Narwhal Lefty Sand Top: 13,888' MD / 4,154' TVD Last Update: 01/15/19 AJD Conductor Installed: 20" set @ 107' MD / TVD 16" Surface Hole 9 5/8" x 13 3/8" Liner hanger: 2,662.9' MD' Surface Casing: 13-3/8" 68# L-80 TXPM 2,835.9' MD / 2,374.2' TVD 12-1/4" Intermediate 1 Hole TOC @ 8,344' MD / 3,198' TVD Top KOP @ 9,750' MD Intermediate 1: 9 5/8" 40#, L80, TXPM @ 10,260.3' MD / 3,447.4' TVD TOC @ ± 10,721' MD / 3,484' TVD 2,576' MD / 285' TVD Above Top K-3 Sacrificial String Disconnect Tool w/ 3-'/:" HYD563 tubing tail Pilot Hole TD: 14,747' MD / 4,724.6' TVD @ 37.3 deg 8-3/4" Pilot Hole NADConversion North Alaska ASP4 CD4 Nanuq Pad CD4-594 ConocoPhillips Definitive Survey Report 23 December, 2019 CD4-594 Final Definitive Survey Verified and Signed -off All targets and/or well position objectives have been achieved. ['] Yes ] No l have checked to the best of my ability that the following data is correct: C Surface Coordinates Declination & Convergence GRS Survey Corrections `L.; Survey Tool Codes SLB DE: Client Representative: Date: aaron.donat@oonocophillips.comE: ConocoPhilli s p ConocoPhillips Definitive Survey Report Company: NADConversion Local Coordinate Reference: Well CD4-594 Project: North Alaska ASP4 TVD Reference: CD4-594 Actual @ 46.4usft Site: CD4 Nanuq Pad MD Reference: CD4-594 Actual @ 46.4usft Well: CD4-594 North Reference: True Wellbore: CD4-594 Survey Calculation Method: Minimum Curvature Design: CD4-594 Database: EDT 14 Alaska Production Project North Alaska ASP4 Map System: US State Plane 1927 (Exact solution) System Datum: Mean Sea Level Geo Datum: NAD 1927 (NADCON CONUS) Using Well Reference Point Map Zone: Alaska Zone 04 Using geodetic scale factor Well CD4-594 Well Position +N/-S +E/-W Position Uncertainty i Wellbore CD4-594 Magnetics Model Name BGGM201E Design CD4-594 Audit Notes: 0.0 usft Northing: 0.0 usft Easting: 0.0 usft Wellhead Elevation Sample Date 11/1/2019 5,957,553.49 usft Latitude: 378,291.33 usft • Longitude: 0.0 usft Ground Level: Declination Dip Angle 15.96 80.72 70' 17' 33.254 N 150° 59' 7.378 W 19.Ousft ` Field Strength (nT) 57, 367.05079616 Version: 1.0 Phase: ACTUAL Tie On Depth: 10,303.3 Vertical Section: Depth From (TVD) +N/-S +E/-W Direction (usft) (usft) (usft) (°) 27.4 0.0 0.0 129.50 Survey Program Date 12/23/2019 From To (usft) (usft) Survey (Wellbore) Tool Name Description Survey Date 109.9 1,008.1 CD4-594PH1 Srvy 1 - SDI M/GWD Surve GYD-GC-MS Gyrodata gyrocompassing m/s 10/3/2019 4 18, 1,078.4 1,311.0 CD4-594PH1 Srvy 2 - SLB_DUAL+GMAG MWD+IFR2+HDS+MS OWSG MWD + IFR2 + HDS + Multi -Station Correc10/3/2019 4:24: 1,341.0 1,491.0 CD4-594PH1 Srvy 3 - SLB_MWD+SAG ( MWD OWSG OWSG MWD - Standard 10/4/2019 4:28: I 1,521.0 2,740.9 CD4-594PH1 Srvy 4 - SLB_DUAL+GMAG MWD+IFR2+HDS+MS OWSG MWD + IFR2 + HDS + Multi -Station Correc10/4/2019 4:30: 2,837.9 2,837.9 CD4-594PH1 Srvy 5 - SLB_MWD_Inc On MWD-INC_ONLY (INC>10°; MWD-INC_ONLY_FILLER ( INC>10°) 10/11/2019 2:25 2,921.1 10,203.7 CD4-594PH1 Srvy 6 - SLB_DUAL+GMAG MWD+IFR2+HDS+MS OWSG MWD + IFR2 + HDS + Multi -Station Correc10/11/2019 2:27 10,303.3 10,303.3 CD4-594PH1 Srvy 7 - SLB_DUAL+GMAG MWD+IFR2+HDS+MS OWSG MWD + IFR2 + HDS + Multi -Station Correc10/30/2019 2:27 10,395.9 14,707.6 CD4-594 Srvy 1 - SLB_DUAL+GMAG+S MWD+IFR2+HDS+MS OWSG MWD + IFR2 + HDS + Multi -Station Correcll/13/2019 113E 14,805.7 21,070.8 CD4-594 Srvy 2 - SLB_DUAL+GMAG+S MWD+IFR2+HDS+MS OWSG MWD + IFR2 + HDS + Multi -Station Correc12/1/2019 11:38, Survey Map Map Vertical MD Inc Azi TVD TVDSS +N/-S +E/-W Northing Easting DLS Section (usft) (°) (°) (usft) (usft) (usft) (usft) (ft) (ft) (°/100') (ft) Survey Tool Name 27.4 0.00 0.00 27A -19.0 0.0 0.0 5,957,553.5 378,291.3 0.0 0.00 UNDEFINED 109.9 0.30 256.26 109.9 63.5 -0.1 -0.2 5,957,553.4 378,291.1 0.4 -0,13 GYD-GC-MS (1) 135.6 0.33 167,50 135.5 89.1 -0.1 -0.3 5,957,553.4 378,291.1 1.7 -0.11 GYD-GC-MS (1) 168.3 0.30 69.50 168.3 121.9 -0.2 -0.2 5,957,553.3 378,291.2 1.5 0.01 GYD-GC-MS (1) 201.4 0,43 129.92 201.4 155.0 -0.3 &0 5,957,553.2 378,291.3 1.2 0.17 GYD-GC-MS (1) 258.1 0.77 88.64 258.1 211.7 -0.4 0.6 5,957,553.1 378,291.9 0.9 0.67 GYD-GC-MS (1) 350.7 2.60 103,07 350.7 304.3 -0.8 3.2 5,957,552.6 378,294.5 2.0 3.03 GYD-GC-MS (1) 12/23/2019 12:12:13PM Page 2 COMPASS 5000.14 Build 85H ConocoPhillips Definitive Survey Report Company: NADConversion Local Co-ordinate Reference: Well CD4-594 Project: North Alaska ASP4 TVD Reference: CD4-594 Actual @ 46.4usft Site: CD4 Nanuq Pad MD Reference: CD4-594 Actual @ 46.4usft Well: CD4-594 North Reference: True Wellbore: CD4-594 Survey Calculation Method: Minimum Curvature Design: CD4-594 Database: EDT 14 Alaska Production Survey Map Map Vertical MD Inc Azi TVD TVDSS +N/-S +E/-W Northing Easting DLS Section (usft) (°) 0 (usft) (usft) (usft) (usft) (ft) (ft) (°/100-) (ft) Survey Tool Name 443.4 3.46 102.75 443.2 396.8 -1.9 8.0 5,957,551A 378,299.3 0.9 7.40 GYD-GC-MS (1) 535.0 4.96 102.79 534.6 488.2 -3.4 14.6 5,957,549.8 378,305.8 1.6 13.41 GYD-GC-MS (1) 627.0 5.51 107.69 626.2 579.8 -5.6 22.6 5,957,547.5 378,313.9 0.8 21.06 GYD-GC-MS (1) 716.0 6.52 108.07 714.7 668.3 -8.5 31.5 5,957,544.5 378,322.7 1.1 29.74 GYD-GC-MS(1) 811.9 8.99 101.42 809.7 763.3 -11.7 44.0 5,957,541.1 378,335.2 2.7 41.42 GYD-GC-MS(1) 908.4 12.75 100.17 904.5 858.1 -15.1 61.9 5,957,537.4 378,353.0 3.9 57.36 GYD-GC-MS(1) 1,008.1 15.95 97.66 1,001.0 954.6 -18.8 86.3 5,957,533.3 378,377.3 3.3 78.59 GYD-GC-MS(1) 1,078.4 16.21 96.37 1,068.6 1,022.2 -21.2 105.7 5,957,530.6 378,396.6 0.6 95.01 MWD+IFR2+HDS+MS (2) 1,101.0 16.68 96.79 1,090.3 1,043.9 -21.9 112.0 5,957,529.7 378,403.0 2.1 100.38 MWD+IFR2+HDS+MS (2) 1,131.0 17.70 97.52 1,118.9 1,072.5 -23.0 120.8 5,957,528.5 378,411.7 3.5 107.87 MWD+IFR2+HDS+MS (2) 1,161.0 18.26 97.66 1,147.5 1,101.1 -24.3 130.0 5,957,527.1 378,420.9 1.9 115.74 MWD+IFR2+HDS+MS (2) 1,191.0 18.84 98.23 1,175.9 1,129.5 -25.6 139.4 5,957,525.7 378,430.3 2.0 123.87 MWD+IFR2+HDS+MS (2) 1,221.0 19.42 99.07 1,204.2 1,157.8 -27.1 149.2 5,957,524.0 378,440.0 2.1 132.31 MWD+IFR2+HDS+MS (2) 1,251.0 19.81 100.47 1,232.5 1,186.1 -28.8 159.1 5,957,522.1 378,449.9 2.0 141.05 MWD+IFR2+HDS+MS (2) 1,281.0 20.38 102.32 1,260.7 1,214.3 -30.8 169.2 5,957,519.9 378,460.0 2.8 150.15 MWD+IFR2+HDS+MS (2) 1,311.0 21.09 103.95 1,288.7 1,242.3 -33.2 179.5 5,957,517.4 378,470.3 3.0 159.66 MWD+IFR2+HDS+MS (2) 1,341.0 22.06 104.99 1,316.6 1,270.2 -36.0 190.2 5,957,514.4 378,480.9 3.5 169.66 MWD OWSG (3) 1,371.0 23.14 105.63 1,344.3 1,297.9 -39.0 201.3 5,957,511.2 378,492.0 3.7 180.17 MWD OWSG (3) 1,401.0 24.40 106.28 1,371.8 1,325.4 -42.4 213.0 5,957,507.7 378,503.6 4.3 191.26 MWD OWSG (3) 1,431.0 25.62 106.78 1,399.0 1,352.6 -46.0 225.1 5,957,503.9 378,515.7 4.1 202.94 MWD OWSG (3) 1,461.0 26.39 107.00 1,425.9 1,379.5 -49.8 237.7 5,957,499.9 378,528.2 2.6 215.08 MWD OWSG (3) 1,491.0 27.93 107.23 1,452.6 1,406.2 -53.8 250.8 5,957,495.6 378,541.2 5.1 227.74 MWD OWSG (3) 1,521.0 29.39 107.23 1,479.0 1,432.6 -58.1 264.5 5,957,491.1 378,554.9 4.9 241.06 MWD+IFR2+HDS+MS (4) 1,551.0 30.76 106.76 1,504.9 1,458.5 -62.5 278.9 5,957,486.5 378,569.2 4.6 254.94 MWD+IFR2+HDS+MS (4) 1,581.0 32.14 106.29 1,530.5 1,484.1 -66.9 293.9 5,957,481.8 378,584.1 4.7 269.35 MWD+IFR2+HDS+MS (4) 1,611.0 33.05 105.83 1,555.8 1,509.4 -71.4 309.4 5,957,477.1 378,599.6 3.1 284.18 MWD+IFR2+HDS+MS (4) 1,641.0 33.89 105.37 1,580.8 1,534.4 -75.8 325.4 5,957,472.4 378,615.4 2.9 299.31 MWD+IFR2+HDS+MS (4) 1,671.0 34.67 104.91 1,605.6 1,559.2 -80.3 341.7 5,957,467.7 378,631.6 2.7 314.70 MWD+IFR2+HDS+MS (4) 1,701.0 35.19 104.47 1,630.2 1,583.8 -84.6 358.3 5,957,463.1 378,648.2 1.9 330.29 MWD+IFR2+HDS+MS (4) 1,731.0 35.73 104.27 1,654.6 1,608.2 -88.9 375.2 5,957,458.5 378,665.0 1.8 346.05 MWD+IFR2+HDS+MS (4) 1,761.0 36.28 104.15 1,678.9 1,632.5 -93.3 392.3 5,957,453.9 378,682.0 1.8 361.99 MWD+IFR2+HDS+MS (4) 1,791.0 36.44 104.02 1,703.1 1,656.7 -97.6 409.5 5,957,449.3 378,699.2 0.6 378.05 MWD+IFR2+HDS+MS (4) 1,821.0 37.04 103.57 1,727.1 1,680.7 -101.9 426.9 5,957,444.7 378,716.5 2.2 394.22 MWD+IFR2+HDS+MS (4) 1,851.0 37.87 102.96 1,750.9 1,704.5 -106.0 444.7 5,957,440.3 378,734.2 3.0 410.59 MWD+IFR2+HDS+MS (4) 1,881.0 39.02 102.34 1,774.4 1,728.0 -110.1 462.9 5,957,435.9 378,752.3 4.0 427.23 MWD+IFR2+HDS+MS (4) 1,911.0 40.15 101.87 1,797.5 1,751.1 -114.1 481.6 5,957,431.6 378,771.0 3.9 444.20 MWD+IFR2+HDS+MS (4) 1,941.0 40.85 101.52 1,820.3 1,773.9 -118.1 500.7 5,957,427.3 378,790.0 2.5 461.43 MWD+IFR2+HDS+MS (4) 1,971.0 41.33 101.18 1,842.9 1,796.5 -122.0 520.0 5,957,423.1 378,809.2 1.8 478.82 MWD+IFR2+HDS+MS (4) 2,001.0 41.66 101.16 1,865.4 1,819.0 -125.8 539.5 5,957,419.0 378,828.7 1.1 496.31 MWD+IFR2+HDS+MS (4) 2,031.0 41.52 101.75 1,887.9 1,841.5 -129.8 559.0 5,957,414.7 378,848.1 1.4 513.89 MWD+IFR2+HDS+MS (4) 1212312019 12:12.13PM Page 3 COMPASS 5000.14 Build 85H ConocoPhillips i Definitive Survey Report Company: NADConversion Local Co-ordinate Reference: Well CD4-594 Project: North Alaska ASP4 TVD Reference: CD4-594 Actual @ 46.4usft Site: CD4 Nanuq Pad MD Reference: CD4-594 Actual @ 46.4usft Well: CD4-594 North Reference: True Wellbore: CD4-594 Survey Calculation Method: Minimum Curvature Design: CD4-594 Database: EDT 14 Alaska Production Survey Map Map Vertical MD Inc Azi TVD TVDSS +N/-S +E/-W Northing Easting DLS Section (usft) (°) (°) (usft) (usft) (usft) (usft) (ft) (ft) (°/100.) (ft) Survey Tool Name 2,061.0 41.72 102.34 1,910.3 1,863.9 -133.9 578.5 5,957,410.2 378,867.5 1.5 531.57 MWD+IFR2+HDS+MS (4) 2,091+0 42.70 102.88 1,932.5 1,886.1 -138.3 598.2 5,957,405.5 378,887.1 3.5 549.55 MWD+IFR2+HDS+MS (4) 2,121.0 43.89 103.28 1,954.3 1,907.9 -143.0 618.2 5,957,400.5 378,907.1 4.1 W 567.97 MD+IFR2+HDS+MS (4) 2,151.0 44.77 103.66 1,975.8 1,929.4 -147.9 638.6 5,957,395.3 378,927.4 3.1 586.81 MWD+IFR2+HDS+MS (4) 2,181.0 45.47 103.95 1,997.0 1,950.6 -152.9 659.2 5,957,389.9 378,948.0 2.4 605.96 MWD+IFR2+HDS+MS (4) 2,211.0 46.62 103.62 2,017.8 1,971.4 -158.1 680.2 5,957,384.4 378,968.8 3.9 625.42 MWD+IFR2+HDS+MS (4) 2,241.0 47.52 103.21 2,038.2 1,991.8 -163.2 701.6 5,957,379+0 378,990.1 3.2 645.14 MWD+IFR2+HDS+MS (4) 2,271.0 48.66 102.81 2,058.3 2,011.9 -168.2 723.3 5,957,373.6 379,011.8 3.9 665.13 MWD+IFR2+HDS+MS (4) 2,301.0 49.60 102.46 2,077.9 2,031.5 -173.2 745.5 5,957,368.3 379,033.8 3.3 685.36 MWD+IFR2+HDS+MS (4) 2,331.0 50.29 102.12 2,097.2 2,050.8 -178.1 767.9 5,957,363.0 379,056.2 2.5 705.78 MWD+IFR2+HDS+MS (4) 2,361.0 50.97 101.79 2,116.2 2,069.8 -182.9 790.6 5,957,357.9 379,078+8 2.4 726.35 MWD+IFR2+HDS+MS (4) 2,391.0 51.67 101.85 2,135.0 2,088.6 -187.7 813.5 5,957,352.7 379,101.6 2.3 747.08 MWD+IFR2+HDS+MS (4) 2,421.0 52.30 102.10 2,153.4 2,107.0 -192.6 836.6 5,957,347.4 379,124.7 2.2 768.04 MWD+IFR2+HDS+MS (4) 2,451.0 52.95 102.34 2,171.7 2,125.3 -197.6 859.9 5,957,342.0 379,147.9 2.3 789.23 MWD+IFR2+HDS+MS (4) 2,481.0 53.71 102.33 2,189.6 2,143.2 -202.8 883.4 5,957,336.5 379,171.3 2.5 810.64 MWD+IFR2+HDS+MS (4) 2,511.0 54.84 102.09 2,207.1 2,160.7 -207.9 907.2 5,957,330.9 379,195.0 3.8 832.28 MWD+IFR2+HDS+MS (4) 2,541.0 56.10 101.86 2,224.1 2,177.7 -213.0 931.4 5,957,325.4 379,219.1 4.2 854.20 MWD+IFR2+HDS+MS (4) 2,571.0 57.17 1 01 .77 2,240.6 2,194.2 -218.2 955.9 5,957,319.9 379,243.5 3.6 876.39 MWD+IFR2+HDS+MS (4) 2,601.0 57.74 101.89 2,256.7 2,210.3 -223.3 980.7 5,957,314.3 379,268.2 1.9 898.78 MWD+IFR2+HDS+MS (4) 2,631.0 58.30 102.01 2,272.6 2,226.2 -228.6 1,005.6 5,957,308.6 379,293.0 1.9 921.34 MWD+IFR2+HDS+MS (4) 2,661.0 58.93 102.19 2,288.2 2,241.8 -234.0 1,030.6 5,957,302.9 379,318.0 2.2 944.08 MWD+IFR2+HDS+MS (4) 2,691.0 59.81 102.50 2,303.5 2,257.1 -239.5 1,055.9 5,957,296.9 379,343.1 3.1 967.05 MWD+IFR2+HDS+MS (4) 2,721.0 60.47 102.82 2,318.5 2,272.1 -245.2 1,081.2 5,957,290.8 379,368.4 2.4 990.26 MWD+IFR2+HDS+MS (4) 2,740.9 60.63 103.04 2,328.3 2,281.9 -249.1 1,098.2 5,957,286.7 379,385.2 1.3 1,005.79 MWD+IFR2+HDS+MS (4) 2,835.0 61.53 103.49 2,373.8 2,327.4 -268.0 1,178.3 5,957,266.5 379,465.0 1.0 1,07R64 NOT an Actual Survey 13318x16 2,837.9 61.56 103.50 2,375.1 2,328.7 -268.6 1,180.7 5,957,265.9 379,467.5 1.0 1,081.90 MWD-INC_ONLY (INC>10°) (5) 2,921.1 63.47 105.09 2,413.5 2,367.1 -286.8 1,252.3 5,957,246.5 379,538.7 2.9 1,148.69 MWD+IFR2+HDS+MS (6) 2,951.0 64.46 105.48 2,426.7 2,380.3 -293.9 1,278.2 5,957,239.0 379,564.5 3.5 1,173.21 MWD+IFR2+HDS+MS (6) 2,981.0 65A7 105.87 2,439.4 2,393.0 -301.2 1,304.4 5,957,231.2 379,590.6 3.6 1,198.08 MWD+IFR2+HDS+MS (6) 3,011.0 66.35 106.27 2,451.6 2,405.2 -308.8 1,330.7 5,957,223.2 379,616.7 3.2 1,223.20 MWD+IFR2+HDS+MS (6) 3,041.0 67.36 106.93 2,463.4 2,417.0 -316.7 1,357.1 5,957,214.9 379,643.0 3.9 1,248.62 MWD+IFR2+HDS+MS (6) 3,071.0 68.34 107.66 2,474.7 2,428.3 -325.0 1,383.7 5,957,206.2 379,669.4 4.0 1,274.34 MWD+IFR2+HDS+MS (6) 3,101.0 69.20 108.40 2,485.6 2,439.2 -333.6 1,410.2 5,957,197.1 379,695.9 3.7 1,300.36 MWD+IFR2+HDS+MS (6) 3,131.0 69.90 109.06 2,496.0 2,449.6 -342.6 1,436.9 5,957,187.7 379,722.3 3.1 1,326.64 MWD+IFR2+HDS+MS (6) 3,161.0 70.69 109.69 2,506.2 2,459.8 -352.0 1,463.5 5,957,17T9 379,748.8 3.3 1,353.16 MWD+IFR2+HDS+MS (6) 3,191.0 71.73 110.32 2,515.8 2,469.4 -361.7 1,490.2 5,957,167.7 379,775.4 4.0 1,379.94 MWD+IFR2+HDS+MS (6) 3,221.0 72.97 110.92 2,524.9 2,478.5 -371.8 1,517.0 5,957,157.2 379,801.9 4.6 1,406.98 MWD+IFR2+HDS+MS (6) 3,251.0 73.99 111.48 2,533.4 2,487.0 -382.2 1,543.8 5,957,146.4 379,828.6 3.8 1,434.29 MWD+IFR2+HDS+MS(6) 3,281.0 74.96 112.05 2,541.5 2,495.1 -392.9 1,570.6 5,957,135.2 379,855.2 3.7 1,461.82 MWD+IFR2+HDS+MS (6) 1212312019 12.12:13PM Page 4 COMPASS 5000.14 Build 85H ConocoPhillips Definitive Survey Report Company: NADConversion Local Co-ordinate Reference: Well CD4-594 Project: North Alaska ASP4 TVD Reference: CD4-594 Actual @ 46.4usft Site: CD4 Nanuq Pad MD Reference: CD4-594 Actual @ 46.4usft Well: CD4-594 North Reference: True Wellbore: CD4-594 Survey Calculation Method: Minimum Curvature Design: CD4-594 Database: EDT 14 Alaska Production Survey Map Map Vertical MD Inc Azi TVD TVDSS +N/-S +E/-W Northing Easting DLS Section (usft) (°) (°) (usft) (usft) (usft) (usft) (ft) (ft) (°/100') (ft) Survey Tool Name 3,311.0 76.01 112.59 2,549.0 2,502.6 -403.9 1,597.5 5,957,123.8 379,881+9 3.9 1,489.57 MWD+IFR2+HDS+MS (6) 3,341.0 77.02 113.06 2,556.0 2,509.6 -415.3 1,624.4 5,957,112.0 379,908.6 3.7 1,517.51 MWD+IFR2+HDS+MS (6) 3,371.0 77.73 113.54 2,562.6 2,516.2 -426.8 1,651.3 5,957,100.0 379,935.3 2.8 1,545.62 MWD+IFR2+HDS+MS (6) 3,401.0 78.30 114.07 2,568.8 2,522A -438.7 1,678.1 5,957,087.7 379,962.0 2.6 1,573.88 MWD+IFR2+HDS+MS (6) 3,431.0 78.50 114.80 2,574.8 2,528.4 -450.8 1,704.9 5,957,075.1 379,988.5 2.5 1,602.25 MWD+IFR2+HDS+MS (6) 3,461.0 78.82 115.55 2,580.7 2,534.3 -463.4 1,731.5 5,957,062.2 380,014.9 2.7 1,630.75 MWD+IFR2+HDS+MS (6) 3,491.0 79.24 116.31 2,586.4 2,540.0 -476.2 1,758.0 5,957,048.9 380,041.2 2.9 1,659.38 MWD+IFR2+HDS+MS (6) 3,521.0 79.55 117.12 2,591.9 2,545.5 -489.5 1,784.3 5,957,035.2 380,067.3 2.8 1,688A4 MWD+IFR2+HDS+MS (6) 3,551.0 79.74 117.94 2,597.3 2,550.9 -503.1 1,810.5 5,957,021.2 380,093.3 2.8 1,717.01 MWD+IFR2+HDS+MS (6) 3,581.0 79.84 118.76 2,602.7 2,556.3 -517.1 1,836.5 5,957,006.7 380,119.0 2.7 1,745.97 MWD+IFR2+HDS+MS (6) 3,611.0 80.04 119.65 2,607.9 2,561.5 -531.6 1,862.2 5,956,991.9 380,144.6 3.0 1,775.04 MWD+IFR2+HDS+MS (6) 3,641.0 80.49 120.55 2,613.0 2,566.6 -546.4 1,887.8 5,956,976.7 380,169.9 3.3 1,804.21 MWD+IFR2+HDS+MS (6) 3,671.0 81.06 121.45 2,617.8 2,571.4 -561.6 1,913.2 5,956,961.0 380,195.0 3.5 1,833.49 MWD+IFR2+HDS+MS (6) 3,701.0 81.72 122.17 2,622.3 2,575.9 -577.3 1,938.4 5,956,945.0 380,220.0 3.2 1,862.89 MWD+IFR2+HDS+MS (6) 3,731.0 82.08 122.78 2,626.5 2,580.1 -593.2 1,963.5 5,956,928.6 380,244.8 2.3 1,892.36 MWD+IFR2+HDS+MS (6) 3,761.0 82.58 123.38 2,630.5 2,584.1 -609.5 1,988.4 5,956,912.0 380,269.4 2.6 1,921.91 MWD+IFR2+HDS+MS (6) 3,791.0 82.85 123.60 2,634.3 2,587.9 -625.9 2,013+2 5,956,895.2 380,294.0 1.2 1,951.50 MWD+IFR2+HDS+MS (6) 3,821.0 82.95 123.60 2,638.0 2,591.6 -642.3 2,038.0 5,956,878.3 380,318.5 0.3 1,981.12 MWD+IFR2+HDS+MS (6) 3,851.0 82.92 123.60 2,641.7 2,595.3 -658.8 2,062.8 5,956,861.4 380,343.0 0.1 2,010.73 MWD+IFR2+HDS+MS (6) 3,881.0 82.97 123.49 2,645.4 2,599.0 -675.3 2,087.6 5,956,844.6 380,367.6 0.4 2,040.34 MWD+IFR2+HDS+MS (6) 3,911.0 82.99 123.25 2,649.1 2,602.7 -691.7 2,112.5 5,956,827.8 380,392.1 0.8 2,069.95 MWD+IFR2+HDS+MS (6) 3,941.0 83.06 123.02 2,652.7 2,606.3 -707.9 2,137.4 5,956,811.1 380,416.8 0.8 2,099.54 MWD+IFR2+HDS+MS (6) 3,971.0 83.08 122.90 2,656.3 2,609.9 -724.1 2,162.4 5,956,794.5 380,441.5 0.4 2,129.13 MWD+IFR2+HDS+MS (6) 4,001.0 83.06 123.02 2,659.9 2,613.5 -740.3 2,187.4 5,956,777.9 380,466.3 0.4 2,158.71 MWD+IFR2+HDS+MS (6) 4,031.0 83.05 123.14 2,663.6 2,617.2 -756.6 2,212.3 5,956,761.2 380,490.9 0.4 2,188.31 MWD+IFR2+HDS+MS (6) 4,061.0 83.08 123.16 2,667.2 2,620.8 -772.9 2,237.3 5,956,744.6 380,515.6 0.1 2,217.91 MWD+IFR2+HDS+MS (6) 4,091.0 83.01 122.83 2,670.8 2,624.4 -789.1 2,262.2 5,956,727.9 380,540+3 1.1 2,247.49 MWD+IFR2+HDS+MS (6) 4,121.0 83.08 122.47 2,674.4 2,628.0 -805.2 2,287.3 5,956,711.5 380,565.1 1.2 2,277.06 MWD+IFR2+HDS+MS (6) 4,151.0 83.23 122.15 2,678.0 2,631.6 -821.1 2,312.5 5,956,695.1 380,590.0 1.2 2,306.61 MWD+IFR2+HDS+MS (6) 4,181.0 83.18 122.06 2,681.6 2,635.2 -836.9 2,337.7 5,956,678.9 380,615.0 0.3 2,336.15 MWD+IFR2+HDS+MS (6) 4,211.0 83.09 122.00 2,685.2 2,638.8 -852.7 2,363.0 5,956,662.7 380,640.0 0.4 2,365.68 MWD+IFR2+HDS+MS (6) 4,241.0 83.09 121.94 2,688.8 2,642.4 -868.5 2,388.2 5,956,646.5 380,665.0 0.2 2,395.21 MWD+IFR2+HDS+MS (6) 4,271.0 83.08 121.89 2,692.4 2,646.0 -884.2 2,413.5 5,956,630.4 380,690.0 0.2 2,424.73 MWD+IFR2+HDS+MS (6) 4,301.0 83.13 121.84 2,696.0 2,649.6 -899.9 2,438.8 5,956,614.3 380,715.1 0.2 2,454.25 MWD+IFR2+HDS+MS (6) 4,331.0 83.17 121.78 2,699.6 2,653.2 -915.6 2,464.1 5,956,598.1 380,740.1 0.2 2,483.77 MWD+IFR2+HDS+MS (6) 4,361.0 83.07 121.63 2,703.2 2,656.8 -931.3 2,489.5 5,956,582.1 380,765.2 0.6 2,513.28 MWD+IFR2+HDS+MS (6) 4,391.0 83.16 121.43 2,706.8 2,660.4 -946.9 2,514.9 5,956,566.1 380,790.3 0.7 2,542.77 MWD+IFR2+HDS+MS (6) 4,421.0 83.23 121.23 2,710.3 2,663.9 -962.4 2,540.3 5,956,550.2 380,815.5 0.7 2,572.26 MWD+IFR2+HDS+MS (6) 4,451.0 83.24 121.05 2,713.8 2,667.4 -977.8 2,565.8 5,956,534.4 380,840.7 0.6 2,601.73 MWD+IFR2+HDS+MS (6) 4,481.0 83.22 120.88 2,717.4 2,671.0 -993.1 2,591.3 5,956,518.7 380,866.0 0.6 2,631.19 MWD+IFR2+HDS+MS (6) 12/232019 12.12:13PM Page 5 COMPASS 5000.14 Build 85H ConocoPhillips ' Definitive Survey Report Company: NADConversion Local Co-ordinate Reference: Well CD4-594 Project: North Alaska ASP4 TVD Reference: CD4-594 Actual @ 46.4usft Site: CD4 Nanuq Pad MD Reference: CD4-594 Actual @ 46.4usft Well: CD4-594 North Reference: True Wellbore: CD4-594 Survey Calculation Method: Minimum Curvature Design: CD4-594 Database: EDT 14 Alaska Production Survey Map Map Vertical MD Inc Azi TVD TVDSS +N/-S +E/-W Northing Easting DLS Section (usft) (°) (°) (usft) (usft) (usft) (usft) (ft) (ft) (°/100-) (ft) Survey Tool Name 4,511.0 83.32 120.71 2,720.9 2,674.5 -1,008.3 2,616.9 5,956,503.0 380,891.4 0.7 2,660.64 MWD+IFR2+HDS+MS (6) 4,541.0 83.27 120.64 2,724.4 2,678.0 -1,023.5 2,642.6 5,956,487.4 380,916.8 0.3 2,690.08 MWD+IFR2+HDS+MS (6) 4,571.0 83.17 120.67 2,727.9 2,681.5 -1,038.7 2,668.2 5,956,471.8 380,942.1 0.3 2,719.52 MWD+IFR2+HDS+MS (6) 4,601.0 83.30 120.70 2,731.5 2,685.1 -1,053.9 2,693.8 5,956,456.2 380,967.5 0.4 2,748.96 MWD+IFR2+HDS+MS (6) 4,631.0 83.17 120.71 2,735.0 2,688.6 -1,069.2 2,719.4 5,956,440.5 380,992.9 0.4 2778.40 MWD+IFR2+HDS+MS (6) 4,661.0 83.04 120.67 2,738.6 2,692.2 -1,084.4 2,745.0 5,956,424.9 381,018.2 0.5 2,807.83 MWD+IFR2+HDS+MS (6) 4,691.0 83.15 120.63 2,742.2 2,695.8 -1,099.5 2,770.7 5,956,409.3 381,043.6 0.4 2,837.26 MWD+IFR2+HDS+MS (6) 1 4,721.0 83.09 120.63 2,745.8 2,699.4 -1,114.7 2,796.3 5,956,393.7 381,069.0 0.2 2,866.69 MWD+IFR2+HDS+MS (6) 4,751.0 82.96 120.75 2,749.4 2,703.0 -1,129.9 2,821.9 5,956,378.1 381,094.3 0.6 2,896.11 MWD+IFR2+HDS+MS (6) 4,781.0 83.06 120.88 2,753.1 2,706.7 -1,145.2 2,847.5 5,956,362.5 381,119.6 0.5 2,925+55 MWD+IFR2+HDS+MS (6) 4,811.0 83.05 120.99 2,756.7 2,710.3 -1,160.5 2,873.0 5,956,346.8 381,144.9 0.4 2,955.00 MWD+IFR2+HDS+MS (6) 4,841.0 82.97 120.98 2,760.4 2,714.0 -1,175.8 2,898.5 5,956,331.0 381,170.2 0.3 2,984.45 MWD+IFR2+HDS+MS (6) 4,871.0 83.09 120.96 2,764.0 2,717.6 -1,191.1 2,924.1 5,956,315.3 381,195.5 0.4 3,013.89 MWD+IFR2+HDS+MS (6) 4,901.0 83.13 120.95 2,767.6 2,721.2 -1,206.4 2,949.6 5,956,299.6 381,220.8 0.1 3,043.35 MWD+IFR2+HDS+MS (6) 4,93,.0 83.07 121.03 2,771.2 2,724.8 -1,221.8 2,975.1 5,956,283.8 381,246.1 0.3 3,072.80 MWD+IFR2+HDS+MS (6) 4,961.0 83.12 121.15 2,774.8 2,728.4 -1,237.2 3,000.6 5,956,268.0 381,271.3 0.4 3,102.26 MWD+IFR2+HDS+MS (6) 4,991.0 83.10 121.27 2,778.4 2,732.0 -1,252.6 3,026.1 5,956,252.2 381,296.5 0.4 3,131.74 MWD+IFR2+HDS+MS (6) 5,021.0 82.97 121.40 2,782.1 2,735.7 -1,268.1 3,051.6 5,956,236.3 381,321.7 0.6 3,161.21 MWD+IFR2+HDS+MS (6) 5,051.0 82.91 121.53 2,785.8 2,739.4 -1,283.6 3,076.9 5,956,220.3 381,346.8 0.5 3,190.69 MWD+IFR2+HDS+MS (6) 5,081.0 82.96 121.67 2,789.4 2,743.0 -1,299.2 3,102.3 5,956,204.3 381,371.9 D.5 3,220.18 MWD+IFR2+HDS+MS (6) 5,111.0 82.92 121.81 2,793.1 2,746.7 -1,314.9 3,127.6 5,956,188.3 381,397.0 0.5 3,249.68 MWD+IFR2+HDS+MS (6) 5,141.0 82.98 121.96 2,796.8 2,750.4 -1,330.6 3,152.9 5,956,172.1 381,422.0 0.5 3,279.19 MWD+IFR2+HDS+MS (6) 5,171.0 83.06 122.10 2,800.5 2,754.1 -1,346.4 3,178.1 5,956,155.9 381,447.0 0.5 3,308.72 MWD+IFR2+HDS+MS (6) 5,201.0 83.05 122.19 2,804.1 2,757.7 -1,362.2 3,203A 5,956,139.7 381,472.0 0.3 3,338.25 MWD+IFR2+HDS+MS (6) 5,231.0 83.07 122.17 2,807.7 2,761.3 -1,378.1 3,228.6 5,956,123.4 381,496.9 0.1 3,367.79 MWD+IFR2+HDS+MS (6) 5,261.0 83.11 122.14 2,811.3 2,764.9 -1,394.0 3,253.8 5,956,107.2 381,521.8 0.2 3,397.33 MWD+IFR2+HDS+MS (6) 5,291.0 83.04 122.17 2,814.9 2,768.5 -1,409.8 3,279.0 5,956,090.9 381,546.8 0.3 3,426.86 MWD+IFR2+HDS+MS (6) 5,321.0 83.07 122.34 2,818.6 2,772.2 -1,425.7 3,304.2 5,956,074.6 381,571.7 0.6 3,456.40 MWD+IFR2+HDS+MS (6) 5,351.0 83.18 122.51 2,822.2 2,775.8 -1,441.7 3,329.3 5,956,058.2 381,596.6 0.7 3,485.96 MWD+IFR2+HDS+MS (6) 5,381.0 83.32 122.64 2,825.7 2,779.3 -1,457.7 3,354.4 5,956,041.8 381,621.4 0.6 3,515.54 MWD+IFR2+HDS+MS (6) 5,411.0 83.22 122.56 2,829.2 2,782.8 -1,473.8 3,379.5 5,956,025.3 381,646.3 0.4 3,545.11 MWD+IFR2+HDS+MS (6) 5,441.0 82.92 122.44 2,832.8 2,786.4 -1,489.8 3,404.6 5,956,008.9 381,671.1 1.1 3,574.67 MWD+IFR2+HDS+MS (6) 5,471.0 83.00 122.34 2,836.5 2,790.1 -1,505.7 3,429.8 5,955,992.6 381,696.0 0.4 3,604.22 MWD+IFR2+HDS+MS (6) 5,501.0 83.13 122.33 2,840.1 2,793.7 -1,521.6 3,454.9 5,955,976.2 381,720.9 0.4 3,633.76 MWD+IFR2+HDS+MS (6) 5,531.0 83.14 122.35 2,843.7 2,797.3 -1,537.6 3,480.1 5,955,959.9 381,745.8 0.1 3,663.32 MWD+IFR2+HDS+MS (6) 5,561.0 83.19 122.37 2,847.3 2,800.9 -1,553.5 3,505.3 5,955,943.6 381,770.7 0.2 3,692.87 MWD+IFR2+HDS+MS (6) 5,591.0 83.33 122.23 2,850.8 2,804.4 -1,569.4 3,530.5 5,955,927.2 381,795.6 0.7 3,722.43 MWD+IFR2+HDS+MS (6) 5,621.0 83.25 122.02 2,854.3 2,807.9 -1,585.3 3,555.7 5,955,911.0 381,820.6 0.7 3,751.98 MWD+IFR2+HDS+MS (6) 5,651.0 83.23 121.81 2,857.8 2,811.4 -1,601.0 3,581.0 5,955,894.8 381,845.6 0.7 3,781.51 MWD+IFR2+HDS+MS (6) 5,681.0 83.18 121.76 2,861.4 2,815.0-1,616.7 3,606.3 5,955,878.7 381,870.7 0.2 3,811+03 MWD+IFR2+HDS+MS (6) 12/23/2019 12:12:13PM Page 6 COMPASS 5000.14 Build 85H i ConocoPhillips Definitive Survey Report Company: NADConversion Local Co-ordinate Reference: Well CD4-594 Project: North Alaska ASP4 TVD Reference: CD4-594 Actual @ 46.4usft Site: CD4 Nanuq Pad MD Reference: CD4-594 Actual @ 46.4usft Well: CD4-594 North Reference: True Wellbore: CD4-594 Survey Calculation Method: Minimum Curvature Design: CD4-594 Database: EDT 14 Alaska Production Survey Map Map Vertical MD Inc Azi TVD TVDSS +N/-S +E/-W Northing Easting DLS Section (usft) (°) (°i (usft) (usft) (usft) (usft) (g) (ft) (°/100') (ft) Survey Tool Name 5,711.0 83.30 121.82 2,864.9 2,818.5 -1,632.4 3,631.6 5,955,862.6 381,895.7 0.4 3,840.55 MWD+IFR2+HDS+MS (6) 5,741.0 83.28 121.88 2,868.4 2,822.0 -1,648.1 3,656.9 5,955,846.5 381,920.8 0.2 3,870.08 MWD+IFR2+HDS+MS (6) 5,771.0 83.38 121.88 2,871.9 2,825.5 -1,663.9 3,682.2 5,955,830.4 381,945.8 0.3 3,899.61 MWD+IFR2+HDS+MS (6) 5,801.0 83.26 121.80 2,875.4 2,829.0 -1,679.6 3,707.5 5,955,814.2 381,970.9 0.5 3,929.14 MWD+IFR2+HDS+MS (6) 5,831.0 83.22 121.71 2,878.9 2,832.5 -1,695.3 3,732.9 5,955,798.1 381,996.0 0.3 3,958.66 MWD+IFR2+HDS+MS (6) 5,861.0 83.23 121.64 2,882.5 2,836.1 -1,710.9 3,758.2 5,955,782.1 382,021.1 0.2 3,988.18 MWD+IFR2+HDS+MS (6) 5,891.0 83.30 121.59 2,886.0 2,839.6 -1,726.5 3,783.6 5,955,766.1 382,046.2 0.3 4,017.69 MWD+IFR2+HDS+MS (6) 5,921.0 83.26 121.54 2,889.5 2,843.1 -1,742.1 3,809.0 5,955,750.1 382,071.3 0.2 4,047.20 MWD+IFR2+HDS+MS (6) 5,951.0 83.02 121.47 2,893.1 2,846.7 -1,757.7 3,834.4 5,955,734.1 382,096.4 0.8 4,076.69 MWD+IFR2+HDS+MS (6) 5,981.0 83.07 121.35 2,896.7 2,850.3 -1,773.2 3,859.8 5,955,718.2 382,121.6 0.4 4,106.17 MWD+IFR2+HDS+MS (6) 6,011.0 83.20 121.23 2,900.3 2,853.9 -1,788.7 3,885.2 5,955,702.3 382,146.8 0.6 4,135.65 MWD+IFR2+HDS+MS (6) 6,041.0 83.16 121.14 2,903.9 2,857.5 -1,804.1 3,910.7 5,955,686.5 382,172.0 0.3 4,165.13 MWD+IFR2+HDS+MS (6) 6,071.0 83.10 121.22 2,907.4 2,861.0 -1,819.5 3,936.2 5,955,670.6 382,197.2 0.3 4,194.60 MWD+IFR2+HDS+MS (6) 6,101.0 83.16 121.32 2,911.0 2,864.6 -1,835.0 3,961.7 5,955,654.8 382,222.4 0.4 4,224.08 MWD+IFR2+HDS+MS (6) 6,131.0 83.22 121.41 2,914.6 2,868.2 -1,850.5 3,987.1 5,955,638.8 382,247.6 0.4 4,253.57 MWD+IFR2+HDS+MS (6) 6,161.0 82.90 121.33 2,918.2 2,871.8 -1,866.0 4,012.5 5,955,622.9 382,272.8 1.1 4,283.05 MWD+IFR2+HDS+MS (6) 6,191.0 83.07 121.20 2,921.9 2,875.5 -1,881.4 4,038.0 5,955,607.1 382,298.0 0.7 4,312.51 MWD+IFR2+HDS+MS (6) 6,221.0 83.22 121.07 2,925.5 2,879.1 -1,896.8 4,063.5 5,955,591.3 382,323.2 0.7 4,341.98 MWD+IFR2+HDS+MS (6) 6,251.0 83.18 121.23 2,929.0 2,882.6 -1,912.3 4,089.0 5,955,575.4 382,348.5 0.5 4,371.46 MWD+IFR2+HDS+MS (6) 6,281.0 83.11 121.54 2,932.6 2,886.2 -1,927.8 4,114.4 5,955.559.5 382,373.6 1.1 4,400.94 MWD+IFR2+HDS+MS (6) 6,311.0 82.95 121.85 2,936.2 2,889.8 -1,943.4 4,139.7 5,955,543.5 382,398.7 1.2 4,430.44 MWD+IFR2+HDS+MS (6) 6,341.0 83.03 122.13 2,939.9 2,893.5 -1,959.2 4,165.0 5,955,527.3 382,423.7 1.0 4,459.97 MWD+IFR2+HDS+MS(6) 6,371.0 83.14 122.38 2,943.5 2,897.1 -1,975.1 4,190.2 5,955,511.0 382,448.6 0.9 4,489.51 MWD+IFR2+HDS+MS (6) 6,401.0 83.19 122.63 2,947.1 2,900.7 -1,991.1 4,215.3 5,955,494.6 382,473.5 0.8 4,519.07 MWD+IFR2+HDS+MS (6) 6,431.0 83.18 122.73 2,950.6 2,904.2 -2,007.2 4,240.4 5,955,478.1 382,498.3 0.3 4,548.65 MWD+IFR2+HDS+MS (6) 6,461.0 82.99 122.55 2,954.2 2,907.8 -2,023.2 4,265.5 5,955,461.6 382,523.1 0.9 4,578.22 MWD+IFR2+HDS+MS (6) 6,491.0 82.92 122.38 2,957.9 2,911.5 -2,039.2 4,290.6 5,955,445.2 382,548.0 0.6 4,607.77 MWD+IFR2+HDS+MS (6) 6,521.0 82.53 122.22 2,961.7 2,915.3 -2,055.1 4,315.7 5,955,428.9 382,572.9 1.4 4,637.29 MWD+IFR2+HDS+MS (6) 6,551.0 82.41 122.10 2,965.7 2,919.3 -2,070.9 4,340.9 5,955,412.7 382,597.8 0.6 4,666.79 MWD+IFR2+HDS+MS (6) 6,581.0 82.72 121.98 2,969.5 2,923.1 -2,086.7 4,366.1 5,955,396.5 382,622.7 1.1 4,696.29 MWD+IFR2+HDS+MS (6) 6,611.0 82.76 121.92 2,973.3 2,926.9 -2,102.5 4,391.4 5,955,380.4 382,647.7 0.2 4,725.79 MWD+IFR2+HDS+MS (6) 6,641.0 82.65 122.08 2,977.1 2,930.7 -2,118.2 4,416.6 5,955,364.2 382,6727 0.6 4,755.29 MWD+IFR2+HDS+MS(6) 6,671.0 82.78 122.27 2,980.9 2,934.5 -2,134.1 4,441.8 5,955,347.9 382,697.6 0.8 4,784.80 MWD+IFR2+HDS+MS (6) 6,701.0 82.84 122A3 2,964.7 2,938.3 -2,150.0 4,466.9 5,955,331.6 382,722.5 0.6 4,814.34 MWD+IFR2+HDS+MS (6) 6,731.0 82.95 122.44 2,988.4 2,942.0 -2,166.0 4,492.1 5,955,315.2 382,747.4 0A 4,843.88 MWD+IFR2+HDS+MS (6) 6,761.0 82.82 122.42 2,992.1 2,945.7 -2,182.0 4,517.2 5,955,298.9 382,772.2 0.4 4,873.42 MWD+IFR2+HDS+MS (6) 6,791.0 82.83 122.40 2,995.9 2,949.5 -2,197.9 4,542.3 5,955,282.5 382,797.1 0.1 4,902.96 MWD+IFR2+HDS+MS (6) 6,821.0 82.87 122.38 2,999.6 2,953.2 -2,213.9 4,567.5 5,955,266.2 382,822.0 0.1 4,932.50 MWD+IFR2+HDS+MS (6) 6,851.0 82.94 122.36 3,003.3 2,956.9 -2,229.8 4,592.6 5,955,249.8 382,846.8 0.2 4,962.04 MWD+IFR2+HDS+MS (6) 6,881.0 83.00 122.34 3,007.0 2,960.6-2,245.7 4,617.8 5,955,233.5 382,871.7 0.2 4,991.58 MWD+IFR2+HDS+MS (6) 1223/2019 12:12.13PM Page 7 COMPASS 5000.14 Build 85H Company: NADConversion Project: North Alaska ASP4 Site: CD4 Nanuq Pad Well: CD4-594 Wellbore: CD4-594 Design: CD4-594 Survey ConocoPhillips Definitive Survey Repoli Local Co-ordinate Reference: TVD Reference: MD Reference: North Reference: Survey Calculation Method: Database: Well CD4-594 CD4-594 Actual @ 46.4usft CD4-594 Actual @ 46.4usft True Minimum Curvature EDT 14 Alaska Production Map Map Vertical MD Inc Azi TVD TVDSS +N/-S +E/-W Northing Easting DLS Section (usft) (°) (°) (usft) (usft) (usft) (usft) (ft) (ft) (°/100-) (ft) Survey Tool Name 6,911.0 82.99 122.20 3,010.6 2,964.2 -2,261.6 4,642.9 5,955,217.2 382,896.7 0.5 5,021.12 MWD+IFR2+HDS+MS (6) 6,941.0 82.87 121.99 3,014.3 2,967.9 -2,277.4 4,668.2 5,955,201.0 382,921.6 0.8 5,050.64 MWD+IFR2+HDS+MS (6) 6,971.0 82.89 121.78 3,018.1 2,971.7 -2,293.2 4,693.4 5,955,184.8 382,946.6 0.7 5,080.15 MWD+IFR2+HDS+MS (6) 7,001.0 82.80 121.69 3,021.8 2,975.4 -2,308.8 4,718.7 5,955,168.8 382,971.7 0.4 5,109.64 MWD+IFR2+HDS+MS (6) 7,031.0 82.68 121.73 3,025.6 2,979.2 -2,324.5 4,744.1 5,955,152.7 382,996.7 0.4 5,139.13 MWD+IFR2+HDS+MS (6) 7,061.0 82.61 121.77 3,029.4 2,983.0 -2,340.1 4,769.4 5,955,136.7 383,021.8 0.3 5,168.61 MWD+IFR2+HDS+MS (6) 7,091.0 82.54 121.88 3,033.3 2,986.9 -2,355.8 4,794.6 5,955,120.6 383,046.8 0.4 5,198.09 MWD+IFR2+HDS+MS (6) 7,121.0 82.53 122.18 3,037.2 2,990.8 -2,371.6 4,819.9 5,955,104.4 383,071.8 1.0 5,227.58 MWD+IFR2+HDS+MS (6) 7,151.0 82.53 122.48 3,041.1 2,994.7 -2,387.5 4,845.0 5,955,088.1 383,096.6 1.0 5,257.10 MWD+IFR2+HDS+MS (6) 7,181.0 82.55 122.78 3,045.0 2,998.6 -2,403.5 4,870.0 5,955,071.6 383,121.4 1.0 5,286.63 MWD+IFR2+HDS+MS (6) 7,211.0 82.54 123.08 3,048.9 3,002.5 -2,419.7 4,895.0 5,955,055.1 383,146.1 1.0 5,316+18 MWD+IFR2+HDS+MS (6) 7,241.0 82.81 123.37 3,052.7 3,006.3 -2,436.0 4,919.9 5,955,038.4 383,170.7 1.3 5,345.76 MWD+IFR2+HDS+MS (6) 7,271.0 83.08 123.60 3,056.4 3,010.0 -2,452.4 4,944.7 5,955,021.5 383,195.3 1.2 5,375.36 MWD+IFR2+HDS+MS (6) 7,301.0 82.34 123.46 3,060.2 3,013.8 -2,468.9 4,969.5 5,955,004.7 383,219.8 2.5 5,404.96 MWD+IFR2+HDS+MS (6) 7,331.0 82.25 123.27 3,064.2 3,017.8 -2,485.2 4,994.4 5,954,987.9 383,244.4 0.7 5,434.52 MWD+IFR2+HDS+MS (6) 7,361.0 82.44 123.09 3,068.2 3,021.8 -2,501.5 5,019.2 5,954,971.3 383,269.0 0.9 5,464.07 MWD+IFR2+HDS+MS (6) 7,391.0 82.49 123.12 3,072.2 3,025+8 -2,517.7 5,044.2 5,954,954.6 383,293.7 0.2 5,493.63 MWD+IFR2+HDS+MS (6) 7,421.0 82.59 123.21 3,076.0 3,029.6 -2,534.0 5,069.1 5,954,938.0 383,318.3 0.4 5,523.19 MWD+IFR2+HDS+MS (6) 7,451.0 82.70 123.30 3,079.9 3,033.5 -2,550.3 5,093.9 5,954,921.2 383,342.9 0.5 5,552.77 MWD+IFR2+HDS+MS (6) 7,481.0 82.69 123.29 3,083.7 3,037.3 -2,566.7 5,118.8 5,954,904.5 383,367.5 0.0 5,582.35 MWD+IFR2+HDS+MS (6) 7,511.0 82.72 123.25 3,087.5 3,041.1 -2,583.0 5,143.7 5,954,887.8 383,392.1 0.2 5,611.93 MWD+IFR2+HDS+MS (6) 7,541.0 82.67 123.20 3,091.3 3,044.9 -2,599.3 5,168.6 5,954,871.1 383,416.7 0.2 5,641.51 MWD+IFR2+HDS+MS (6) 7,571.0 82.73 123.14 3,095.1 3,048.7 -2,615.6 5,193.5 5,954,854.4 383,441.4 0.3 5,671.08 MWD+IFR2+HDS+MS (6) 7,601.0 82.69 123.08 3,098.9 3,052.5 -2,631.8 5,218.4 5,954,837.8 383,466.0 0.2 5,700.66 MWD+IFR2+HDS+MS (6) 7,631.0 82.71 123.02 3,102.8 3,056.4 -2,648.0 5,243.4 5,954,821.1 383,490.7 0.2 5,730.22 MWD+IFR2+HDS+MS (6) 7,661.0 82.74 122.90 3,106.6 3,060.2 -2,664.2 5,268.3 5,954,804.5 383,515.4 0.4 5,759.79 MWD+IFR2+HDS+MS (6) 7,691.0 82.53 122.69 3,110.4 3,064.0 -2,680.4 5,293.3 5,954,788.0 383,540.1 1.0 5,789.34 MWD+IFR2+HDS+MS (6) 7,721.0 82.20 122.49 3,114.4 3,068.0 -2,696.4 5,318.4 5,954,771.6 383,564.9 1.3 5,818.86 MWD+IFR2+HDS+MS (6) 7,751.0 82.02 122.35 3,118.5 3,072.1 -2,712.3 5,343.5 5,954,755.3 383,589.8 0.8 5,848.35 MWD+IFR2+HDS+MS (6) 7,781.0 82.09 122.35 3,122.7 3,076.3 -2,728.2 5,368.6 5,954,739.0 383,614.6 0.2 5,877.83 MWD+IFR2+HDS+MS (6) 7,811.0 81.97 122.35 3,126.8 3,080.4 -2,744.1 5,393.7 5,954,722.7 383,639.4 0.4 5,907.31 MWD+IFR2+HDS+MS (6) 7,841.0 81.80 122.37 3,131.0 3,084.6 -2,760.0 5,418.8 5,954,706.4 383,664.3 0.6 5,936.77 MWD+IFR2+HDS+MS (6) 7,871.0 81.99 122.45 3,135.3 3,088.9 -2,775.9 5,443.8 5,954,690.0 383,689.1 0.7 5,966.25 MWD+IFR2+HDS+MS (6) 7,901.0 82.15 122.52 3,139.4 3,093.0 -2,791.9 5,468.9 5,954,673.7 383,713.9 0.6 5,995.74 MWD+IFR2+HDS+MS (6) 7,931.0 82.19 122.60 3,143.5 3,097.1 -2,807.9 5,494.0 5,954,657.3 383,738.6 0.3 6,025.24 MWD+IFR2+HDS+MS (6) 7,961.0 82.24 122.69 3,147.6 3,101.2 -2,823.9 5,519.0 5,954,640.8 383,763.4 0.3 6,054.75 MWD+IFR2+HDS+MS (6) 7,991.0 82.25 122.78 3,151.6 3,105.2 -2,840.0 5,544.0 5,954,624.4 383,788.2 0.3 6,084.27 MWD+IFR2+HDS+MS (6) 8,021.0 82.30 122.87 3,155.6 3,109.2 -2,856.1 5,569.0 5,954,607.9 383,812.9 0.3 6,113.80 MWD+IFR2+HDS+MS (6) 8,051.0 82.37 122.87 3,159.6 3,113.2 -2,872.2 5,593.9 5,954,591.3 383,837.6 0.2 6,143.33 MWD+IFR2+HDS+MS (6) 8,081.0 82.44 122.84 3,163.6 3,117.2 -2,888.4 5,618.9 5,954,574.8 383,862.3 0.3 6,172.87 MWD+IFR2+HDS+MS (6) 122312019 12:12:13PM Page 8 COMPASS 5000.14 Build 85H ConocoPhillips Definitive Survey Report Company: NADConversion Local Co-ordinate Reference: Well CD4-594 Project: North Alaska ASP4 TVD Reference: CD4-594 Actual @ 46.4usft Site: CD4 Nanuq Pad MD Reference: CD4-594 Actual @ 46.4usft Well: CD4-594 North Reference: True Wellbore: CD4-594 Survey Calculation Method: Minimum Curvature Design: CD4-594 Database: EDT 14 Alaska Production Survey Map Map Vertical MD Inc Azi TVD TVDSS +N/-S +El-W Northing Easting US Section (usft) (°) (°) (usft) (usft) (usft) (usft) (ft) (ft) (°1100') (ft) Survey Tool Name 8,111.0 82.50 122.82 3,167.5 3,121.1 -2,904.5 5,643.9 5,954,558.3 383,887.0 0.2 6,202.41 MWD+IFR2+HDS+MS (6) 8,141.0 82.37 122.71 3,171.5 3,125.1 -2,920.6 5,668.9 5,954,541.8 383,911.8 0.6 6,231.94 MWD+IFR2+HDS+MS (6) 8,171.0 82.30 122.58 3,175.5 3,129.1 -2,936.6 5,694.0 5,954,525.3 383,936.5 0.5 6,261.46 MWD+IFR2+HDS+MS (6) 8,201.0 82.44 122.44 3,179.5 3,133.1 -2,952.6 5,719.0 5,954,508.9 383,961.3 0.7 6,290.97 MWD+IFR2+HDS+MS (6) 8,231.0 82.36 122.46 3,183.4 3,137.0 -2,968.5 5,744.1 5,954,492.6 383,986.2 0.3 6,320.48 MWD+IFR2+HDS+MS (6) 8,261.0 82.47 122.57 3,187.4 3,141.0 -2,984.5 5,769.2 5,954,476.2 384,011.0 0.5 6,350.00 MWD+IFR2+HDS+MS (6) 8,291.0 82.59 122.67 3,191.3 3,144.9 -3,000.6 5,794.3 5,954,459.8 384,035.8 0.5 6,379.53 MWD+IFR2+HDS+MS (6) 8,321.0 82.53 122.79 3,195.2 3,148.8 -3,016.7 5,819.3 5,954,443.3 384,060.5 0A 6,409.07 MWD+IFR2+HDS+MS (6) 8,351.0 82.56 122.92 3,199.1 3,152.7 -3,032.8 5,844.3 5,954,426.7 384,085.2 0.4 6,438.62 MWD+IFR2+HDS+MS (6) 8,381.0 82.54 123.05 3,203.0 3,156.6 -3,049.0 5,869.2 5,954,410.1 384,109.9 0.4 6,468.17 MWD+IFR2+HDS+MS (6) 8,411.0 82.43 123.15 3,206.9 3,160.5 -3,065+2 5,894.1 5,954,393.5 384,134.6 0.5 6,497.73 MWD+IFR2+HDS+MS(6) 8,441.0 82.48 123.17 3,210.8 3,164.4 -3,081.5 5,919.0 5,954,376.8 384,159.2 0.2 6,527.29 MWD+IFR2+HDS+MS (6) 8,471.0 82.54 123.19 3,214.7 3,168.3 -3,097.8 5,943.9 5,954,360.2 384,183.8 0.2 6,556.85 MWD+IFR2+HDS+MS (6) 8,501.0 82.66 123.21 3,218.6 3,172.2 -3,114.1 5,968.8 5,954,343.5 384,208.5 0A 6,586.42 MWD+IFR2+HDS+MS (6) 8,531.0 82.56 123.21 3,222.5 3,176.1 -3,130.4 5,993.7 5,954,326.8 384,233.1 0.3 6,615.99 MWD+IFR2+HDS+MS (6) 8,561.0 82.59 123.21 3,226.3 3,179.9 -3,146.6 6,018.6 5,954,310.1 384,257.7 0.1 6,645.56 MWD+IFR2+HDS+MS (6) 8,591.0 82.58 123.18 3,230.2 3,183.8 -3,162.9 6,043.5 5,954,293.4 384,282.3 0.1 6,675.13 MWD+IFR2+HDS+MS (6) 8,621.0 82.50 122.88 3,234.1 3,187.7 -3,179.2 6,068.4 5,954,276.8 384,307.0 1.0 6,704.69 MWD+IFR2+HDS+MS (6) 8,651.0 82.56 122.53 3,238.0 3,191.6 -3,195.2 6,093.5 5,954,260.3 384,331.8 1.2 6,734.22 MWD+IFR2+HDS+MS (6) 8,681.0 82.52 122.18 3,241.9 3,195.5 -3,211.1 6,118.6 5,954,244.0 384,356.6 1.2 6,763.74 MWD+IFR2+HDS+MS (6) 8,711.0 82.38 122.14 3,245.8 3,199.4 -3,227.0 6,143.8 5,954,227.7 384,381.5 0.5 6,793.23 MWD+IFR2+HDS+MS (6) 8,741.0 82.44 122.21 3,249.8 3,203.4 -3,242.8 6,168.9 5,954,211.5 384,406.4 0.3 6,822.73 MWD+IFR2+HDS+MS (6) 8,771.0 82.48 122.29 3,253.7 3,207.3 -3,258.7 6,194.1 5,954,195.2 384,431.3 0.3 6,852.23 MWD+IFR2+HDS+MS (6) 8,801.0 82.54 122.20 3,257.7 3,211.3 -3,274.5 6,219.2 5,954,179.0 384,456.2 0.4 6,881.74 MWD+IFR2+HDS+MS (6) 8,831.0 82.46 121.99 3,261.6 3,215.2 -3,290.4 6,244.4 5,954,162.7 384,481.2 0.7 6,911.23 MWD+IFR2+HDS+MS (6) 8,861.0 82.51 121.78 3,265.5 3,219.1 -3,306.1 6,269.7 5,954,146.6 384,506.2 0.7 6,940.71 MWD+IFR2+HDS+MS (6) 8,891.0 82.47 121.77 3,269.4 3,223.0 -3,321.7 6,295.0 5,954,130.6 384,531.2 0.1 6,970.18 MWD+IFR2+HDS+MS(6) 8,921.0 82.46 122.01 3,273.4 3,227.0 -3,337.4 6,320.2 5,954,114.4 384,556.2 0.8 6,999.66 MWD+IFR2+HDS+MS (6) 8,951.0 82.51 122.25 3,277.3 3,230.9 -3,353.3 6,345.4 5,954,098.2 384,581.1 0.8 7,029.16 MWD+IFR2+HDS+MS (6) 8,981.0 82.40 122.37 3,281.2 3,234.8 -3,369.1 6,370.6 5,954,081.9 384,606.0 0.5 7,058.67 MWD+IFR2+HDS+MS (6) 9,011.0 82.45 122.21 3,285.2 3,238.8 -3,385.0 6,395.7 5,954,065.6 384,630.9 0.6 7,088.17 MWD+IFR2+HDS+MS (6) 9,041.0 82.52 122.05 3,289.1 3,242.7 -3,400.9 6,420.9 5,954,049.4 384,655.8 0.6 7,117.67 MWD+IFR2+HDS+MS (6) 9,071.0 82.55 121.94 3,293.0 3,246.6 -3,416.6 6,446.1 5,954,033.2 384,680.7 0.4 7,147.16 MWD+IFR2+HDS+MS (6) 9,101.0 82.60 122.08 3,296.9 3,250.5 -3,432.4 6,471.3 5,954,017.1 384,705.7 0.5 7,176.65 MWD+IFR2+HDS+MS (6) 9,131.0 82.68 122.25 3,300.7 3,254.3 -3,448.2 6,496.5 5,954,000.8 384,730.6 0.6 7,206.16 MWD+IFR2+HDS+MS (6) 9,161.0 82.53 122.39 3,304.6 3,258.2 -3,464.1 6,521.7 5,953,984.5 384,755.5 0.7 7,235.68 MWD+IFR2+HDS+MS (6) 9,191.0 82.42 122.35 3,308.5 3,262.1 -3,480.1 6,546.8 5,953,968.2 384,780.4 0.4 7,265.19 MWD+IFR2+HDS+MS (6) 9,221.0 82.38 122.27 3,312.5 3,266.1 -3,495.9 6,571.9 5,953,951.9 384,805.2 0.3 7,294.69 MWD+IFR2+HDS+MS (6) 9,251.0 82.48 122.19 3,316.4 3,270.0 -3,511.8 6,597.1 5,953,935.6 384,830.1 0.4 7,324.19 MWD+IFR2+HDS+MS (6) 9,281.0 82.44 122.22 3,320.4 3,274.0-3,527.7 6,622.2 5,953,919.4 384,855.0 0.2 7,353.69 MWD+IFR2+HDS+MS (6) 1212312019 12:12:13PM Page 9 COMPASS 5000.14 Build 85H CVI Conocoftillips Definitive Survey Report Company: NADConversion Local Co-ordinate Reference: Well CD4-594 Project: North Alaska ASP4 TVD Reference: CD4-594 Actual @ 46.4usft Site: CD4 Nanuq Pad MD Reference: CD4-594 Actual @ 46.4usft Well: CD4-594 North Reference: True Wellbore: CD4-594 Survey Calculation Method: Minimum Curvature Design: CD4-594 Database: EDT 14 Alaska Production Survey Map Map Vertical MD Inc Azi TVD TVDSS +N/-S +E/-W Northing Easting DLS Section (usft) (°) (°) (usft) (usft) (usft) (usft) (ft) (ft) (°1100') (ft) Survey Tool Name 9,311.0 82.49 122.28 3,324.3 3,277.9 -3,543.5 6,647.4 5,953,903.1 384,879.9 0.3 7,383.19 MWD+IFR2+HDS+MS (6) 9,341.0 82.56 122.34 3,328.2 3,281.8 -3,559.4 6,672.5 5,953,886.8 384,904.8 0.3 7,412.70 MWD+IFR2+HDS+MS (6) 9,371.0 82.34 122.30 3,332.1 3,285.7 -3,575.3 6,697.7 5,953,870.5 384,929.7 0.7 7,442.21 MWD+IFR2+HDS+MS (6) 9,401.0 82.43 122.21 3,336.1 3,289.7 -3,591.2 6,722.8 5,953,854.2 384,954.6 0.4 7,471.71 MWD+IFR2+HDS+MS (6) 9,431.0 82.47 122.12 3,340.1 3,293.7 -3,607.0 6,748.0 5,953,838.0 384,979.5 0.3 7,501.20 MWD+IFR2+HDS+MS (6) 9,461.0 82.47 122.10 3,344.0 3,297.6 -3,622.8 6,773.2 5,953,821.8 385,004.4 0.1 7.530.70 MWD+IFR2+HDS+MS (6) 9,491.0 82.47 122.15 3,347.9 3,301.5 -3,638.7 6,798.4 5,953,805.6 385,029.3 0.2 7,560.19 MWD+IFR2+HDS+MS (6) 9,521.0 82.51 122.20 3,351.8 3,305.4 -3,654.5 6,823.5 5,953,789.3 385,054.2 0.2 7,589.69 MWD+IFR2+HDS+MS (6) 9,551.0 82.42 122.28 3,355.8 3,309.4 -3,670.4 6,848.7 5,953,773.0 385,079.1 0.4 7,619.20 MWD+IFR2+HDS+MS (6) 9,581.0 82.44 122.43 3,359.7 3,313.3 -3,686.3 6,873.8 5,953,756.7 385,104.0 0.5 7,648.70 MWD+IFR2+HDS+MS (6) 9,611.0 82.47 122.58 3,363.7 3,317.3 -3,702.3 6,898.9 5,953,740.3 385,128.8 0.5 7,678.22 MWD+IFR2+HDS+MS (6) 9,641.0 82.27 122.74 3,367.6 3,321.2 -3,718.3 6,923.9 5,953,723.9 385,153.6 0.9 7.707.74 MWD+IFR2+HDS+MS (6) 9,671.0 82.21 122.90 3,371.7 3,325.3 -3,734.4 6,948.9 5,953,707.4 385,178.3 0.6 7,737.27 MWD+IFR2+HDS+MS (6) 9,701.0 82.35 123.07 3,375.7 3,329.3 -3,750.6 6,973.8 5,953,690.8 385,203.0 0.7 7,766.80 MWD+IFR2+HDS+MS (6) 9,731.0 82.41 123.24 3,379.7 3,333.3 -3,766.9 6,998.7 5,953,674.1 385,227.6 0.6 7,796.36 MWD+IFR2+HDS+MS (6) 9,761.0 82.52 123.44 3,383.6 3,337.2 -3,783.2 7,023.6 5,953,657.4 385,252.2 0.8 7,825.93 MWD+IFR2+HDS+MS (6) 9,791.0 82.62 123.65 3,387.5 3,341.1 -3,799.6 7,048.4 5,953,640.6 385,276.7 0.8 7,855.51 MWD+IFR2+HDS+MS (6) 9,821.0 82.64 123.86 3,391.4 3,345.0 -3,816.2 7,073.1 5,953,623.6 385,301.2 0.7 7,885.12 MWD+IFR2+HDS+MS (6) 9,851.0 82.71 123.97 3,395.2 3,348.8 -3,832.8 7,097.8 5,953,606+6 385,325.6 0.4 7,914.73 MWD+IFR2+HDS+MS (6) 9,881.0 82.68 124.05 3,399.0 3,352.6 -3,849.4 7,122.5 5,953,589.6 385,350.0 0.3 7,944.35 MWD+IFR2+HDS+MS (6) 9,911.0 82.65 124.13 3,402.8 3,356.4 -3,866.1 7,147.1 5,953,572.5 385,374+3 0.3 7,973.97 MWD+IFR2+HDS+MS (6) 9,941.0 82.75 123.93 3,406+6 3,360.2 -3,882.7 7,171.8 5,953,555.5 385,398.7 0.7 8,003.59 MWD+IFR2+HDS+MS (6) 9,971.0 82.69 123.59 3,410.4 3,364+0 -3,899.3 7,196.5 5,953,538.5 385,423.2 1.1 8,033.20 MWD+IFR2+HDS+MS (6) 10,001.0 82.73 123.25 3,414.3 3,367.9 -3,915.7 7,221.4 5,953,521.7 385,447.7 1.1 8,062.79 MWD+IFR2+HDS+MS (6) 10,031.0 82.64 122.98 3,418.1 3,371.7 -3,931.9 7,246.3 5,953,505.1 385,472.4 0.9 8,092.36 MWD+IFR2+HDS+MS (6) 10,061.0 82.60 122.77 3,421.9 3,375.5 -3,948.1 7,271.3 5,953,488.5 385,497.1 0.7 8,121.92 MWD+IFR2+HDS+MS (6) 10,091.0 82.63 122.56 3,425.8 3,379.4 -3,964.1 7,296.3 5,953,472.1 385,521.9 0.7 8,151.45 MWD+IFR2+HDS+MS (6) 10,121.0 82.64 122.37 3,429.6 3,383.2 -3,980.1 7,321.4 5,953,455.7 385,546.7 0.6 8,180.98 MWD+IFR2+HDS+MS (6) 10,151.0 82.56 122.22 3,433.5 3,387.1 -3,996.0 7,346.6 5,953,439.4 385,571.6 0.6 8,210.50 MWD+IFR2+HDS+MS (6) 10,181.0 82.52 122.08 3,437.4 3,391.0 -4,011.8 7,371.7 5,953,423.2 385,596.5 0.5 8,240.00 MWD+IFR2+HDS+MS (6) 10,203.7 82.63 121.96 3,440.3 3,393.9 -4,023.8 7,390.9 5,953,410.9 385,615.5 0.7 8,262.36 MWD+IFR2+HDS+MS (6) 10,260.0 83.08 95/8"x121/4" 120.03 3,447.3 3,400.9 4,052.5 7,438.7 5,953,381.4 385,662.8 3.5 8,317.56 NOT an Actual Survey 10,303.3 83.44 118.55 3,452.4 3,406.0 4,073.6 7,476.2 5,953,359.7 385,700.0 3.5 8,359.91 MWD+IFR2+HDS+MS (7) 10,395.9 82.25 118.79 3,463.9 3,417.5 -4,117.7 7,556.9 5,953,314.4 385,779.9 1.3 8AWA5 MWD+IFR2+HDS+MS(8) 10,425.0 82.15 119.54 3,467.9 3,421.5 4,131.7 7,582.0 5,953,299.9 385,804.8 2.6 8,478.48 MWD+IFR2+HDS+MS (8) 10,455.0 81.95 120.32 3,472.0 3,425.6 -4,146.5 7,607.8 5,953,284.7 385,830.3 2.7 8,507.78 MWD+IFR2+HDS+MS (8) 10,485.0 82.04 121.09 3,476.2 3,429.8 -4,161.7 7,633.3 5,953,269.1 385,855.6 2.6 8,537.14 MWD+IFR2+HDS+MS (8) 10,515.0 82.07 121.70 3,480.4 3,434.0 4,177.2 7,658.7 5,953,253.2 385,880.7 2.0 8,566.56 MWD+IFR2+HDS+MS (8) 10,545.0 82.05 122.26 3,484.5 3,438.1 4,192.9 7,683.9 5,953,237.1 385,905.7 1.8 8,596.01 MWD+IFR2+HDS+MS (8) 12/23/2019 12:12:13PM Page 10 COMPASS 5000.14 Build 85H ConocoPhillips Definitive Survey Report Company: NADConversion Local Coordinate Reference: Well CD4-594 Project: North Alaska ASP4 TVD Reference: CD4-594 Actual @ 46.4usft Site: CD4 Nanuq Pad MD Reference: CD4-594 Actual @ 46.4usft Well: CD4-594 North Reference: True Wellbore: CD4-594 Survey Calculation Method: Minimum Curvature Design: CD4-594 Database: EDT 14 Alaska Production Survey Map Map Vertical MD Inc Azi TVD TVDSS +N1-S +El-W Northing Easting DLS Section (usft) (°) (1) (usft) (usft) (usft) (usft) (ft) (ft) (°N00') (ft) Survey Tool Name 10,575.0 82.02 122.82 3,488.7 3,442.3 -4,208.9 7,708.9 5,953,220.7 385,930.4 1.9 8,625.50 MWD+IFR2+HDS+MS (8) 10,605.0 81.97 122.84 3,492.8 3,446.4 -4,225.0 7,733.9 5,953,204.2 385,955.1 0.2 8,655.01 MWD+IFR2+HDS+MS (8) 10,635.0 82.00 122.56 3,497.0 3,450.6 -4,241.0 7,758.9 5,953,187.7 385,979.9 0.9 8,684.51 MWD+IFR2+HDS+MS (8) 10,665.0 82.01 122.27 3,501.2 3,454.8 -4,257.0 7,783.9 5,953,171.4 386,004.7 1.0 8,713.99 MWD+IFR2+HDS+MS (8) 10,695.0 81.99 122.36 3,505.4 3,459.0 A,272.9 7,809.1 5,953,155.1 386,029.5 0.3 8,743.46 MWD+IFR2+HDS+MS (8) 10,725.0 82.00 122.82 3,509.5 3,463.1 -4,288.9 7,834.1 5,953,138.7 386,054.3 1.5 8,772.96 MWD+IFR2+HDS+MS (8) 10,755.0 82.09 123.29 3,513.7 3,467.3 -4,305.1 7,859.0 5,953,122.1 386,078.9 1.6 8,802.48 MWD+IFR2+HDS+MS (8) 10,785.0 82.03 123.48 3,517.8 3,471.4 A.321.4 7,883.8 5,953,105.4 386,103.5 0.7 8,832.02 MWD+IFR2+HDS+MS (8) 10,815.0 82.00 123.15 3,522.0 3,475.6 -4,337.7 7,908.6 5,953,088.7 386,128.0 1.1 8,861.56 MWD+IFR2+HDS+MS (8) 10,845.0 82.05 122.82 3,526.2 3,479.8 -4,353.9 7,933.5 5,953,072.1 386,152.7 1.1 8,891.08 MWD+IFR2+HDS+MS (8) 10,875.0 82.00 122.63 3,530.3 3,483.9 A,370.0 7,958+5 5,953,055.6 386,177.4 0.6 8,920.58 MWD+IFR2+HDS+MS (8) 10,905.0 82.11 122.85 3,534.5 3,488.1 -4,386.0 7,983.5 5,953,039.2 386,202.1 0.8 8,950.08 MWD+IFR2+HDS+MS (8) 10,935.0 82.58 123.08 3,538.5 3,492.1 A.402.2 8,008.5 5,953,022.6 386,226.8 1.7 8,979.62 MWD+IFR2+HDS+MS (8) 10,965.0 82.42 123.26 3,542.4 3,496.0 -4,418.5 8,033.4 5,953,005.9 386,251.5 0.8 9,009.18 MWD+IFR2+HDS+MS (8) 10,995.0 82.47 123.14 3,546.3 3,499.9 -4,434.8 8,058.3 5,952,989.2 386,276.1 0.4 9,038.74 MWD+IFR2+HDS+MS (8) 11,025.0 82.40 123.00 3,550.3 3,503.9 A,451.0 8,083.2 5,952,972.6 386,300.7 0.5 9,068.30 MWD+IFR2+HDS+MS (8) 11,055.0 82.52 122.87 3,554.2 3,507.8 -4,467.2 8,108.1 5,952,956.0 386,325.4 0.6 9,097.84 MWD+IFR2+HDS+MS (8) 11,085.0 82.45 122.87 3,558.1 3,511.7 A,483.3 8,133.1 5,952,939.5 386,350.1 0.2 9,127.38 MWD+IFR2+HDS+MS (8) 11,115.0 82.41 122.89 3,562.1 3,515.7 A.499.4 8,158.1 5,952,922.9 386,374.8 0.1 9,156.92 MWD+IFR2+HDS+MS (8) 11,145.0 82.59 122.92 3,566.0 3,519.6 -4,515.6 8,183.1 5,952,906.4 386,399.5 0.6 9,186.47 MWD+IFR2+HDS+MS (8) 11,175.0 82.38 122.99 3,569.9 3,523.5 A,531.8 8,208.0 5,952,889.8 386,424.2 0.7 9,216.02 MWD+IFR2+HDS+MS (8) 11,205.0 82.61 123.08 3,573.9 3,527.5 A,548.0 8,233.0 5,952,873.2 386,448.9 0.8 9,245.57 MWD+IFR2+HDS+MS (8) 11,235.0 82.48 123.18 3,577.8 3,531.4 -4,564.3 8,257.9 5,952,856.5 386,473.5 0.5 9,275.14 MWD+IFR2+HDS+MS (8) 11,265.0 82.35 123.22 3,581.7 3,535.3 -4,580.5 8,282.8 5,952,839.8 386,498.2 0.5 9,304.69 MWD+IFR2+HDS+MS (8) 11,295.0 82.46 123.23 3,585.7 3,539.3 -4,596.8 8,307.6 5,952,823.1 386,522.8 0.4 9,334.25 MWD+IFR2+HDS+MS (8) 11,325.0 81.85 123.25 3,589.8 3,543.4 -4,613.1 8,332.5 5,952,806.5 386,547.3 2.0 9,363.79 MWD+IFR2+HDS+MS (8) 11,355.0 82.15 123.20 3,593.9 3,547.5 -4,629.4 8,357.3 5,952,789.8 386,571.9 1.0 9,393.32 MWD+IFR2+HDS+MS (8) 11,385.0 81.81 123.06 3,598.1 3,551.7 A.645.6 8,382.2 5,952,773.1 386,596.5 1.2 9,422.85 MWD+IFR2+HDS+MS (8) 11,415.0 81.96 122.92 3,602.4 3,556.0 -4,661.8 8,407.1 5,952,756.6 386,621.2 0.7 9,452.35 MWD+IFR2+HDS+MS (8) 11,445.0 82.01 122.80 3,606.5 3,560.1 -4,677.9 8,432.1 5,952,740.1 386,645.9 0.4 9,481.86 MWD+IFR2+HDS+MS (8) 11,475.0 81.98 122.70 3,610.7 3,564.3 A,694.0 8,457.1 5,952,723.6 386,670.6 0.3 9,511.36 MWD+IFR2+HDS+MS (8) 11,505.0 82.09 122.60 3,614.9 3,568+5 -4,710.0 8,482.1 5,952,707.1 386,695.3 0.5 9,540.86 MWD+IFR2+HDS+MS (8) 11,535.0 81.94 122.50 3,619.1 3,572.7 -4,726.0 8,507.1 5,952,690.8 386,720.1 0.6 9,570.35 MWD+IFR2+HDS+MS (8) 11,565.0 82.08 122.41 3,623.2 3,576.8 A,742.0 8,532.2 5,952,674.4 386,744.9 0.6 9,599.84 MWD+IFR2+HDS+MS (8) 11,595.0 82.01 122.33 3,627.4 3,581.0 -4,757.9 8,557.3 5,952,658.1 386,769.8 0.4 9,629.32 MWD+IFR2+HDS+MS (8) 11,625.0 82.44 122.25 3,631.4 3,585.0 -4,773.7 8,582.4 5,952,641.8 386,794.6 1.5 9,658.81 MWD+IFR2+HDS+MS (8) 11.655.0 82.36 122.30 3,635.4 3,589.0 -4,789.6 8,607.6 5,952,625.5 386,819.5 0.3 9,688.31 MWD+IFR2+HDS+MS (8) 11,685.0 82.39 122.37 3,639.4 3,593.0 A,805.5 8,632.7 5,952,609.2 386,844.4 0.3 9,717.81 MWD+IFR2+HDS+MS (8) 11,715.0 82.16 122.43 3,643.4 3,597.0 -4,821.5 8,657.8 5,952,592.9 386,869.2 0.8 9,747.31 MWD+IFR2+HDS+MS (8) 11,745.0 82.26 122.45 3,647.5 3,601.1 -4,837.4 8,682.9 5,952,576.6 386,894.0 0.3 9,776.81 MWD+IFR2+HDS+MS (8) 1223/2019 12:12:13PM Page 11 COMPASS 5000.14 Build 85H ConocoPhillips Definitive Survey Report Company: NADConversion Local Co-ordinate Reference: Well CD4-594 Project: North Alaska ASP4 TVD Reference: CD4-594 Actual @ 46.4usft Site: CD4 Nanuq Pad MD Reference: CD4-594 Actual @ 46.4usft Well: CD4-594 North Reference: True Wellbore: CD4-594 Survey Calculation Method: Minimum Curvature Design: CD4-594 Database: EDT 14 Alaska Production Survey Map Map Vertical MD Inc Azi TVD TVDSS +N/-S +E/-W Northing Easting DLS Section (usft) (°) (°) (usft) (usft) (usft) (usft) (ft) (ft) (°/100-) (ft) Survey Tool Name 11,775.0 82.19 122.45 3,651.5 3,605.1 -4,853.3 8,707.9 5,952,560.2 386,918.8 0.2 9,806.31 MWD+IFR2+HDS+MS (8) 11,805.0 82.27 122.45 3,655.6 3,609.2 -4,869.3 8,733.0 5,952,543.9 386,943.7 0.3 9,835.81 MWD+IFR2+HDS+MS (8) 11,835.0 82.16 122.52 3,659.7 3,613.3 -4,885.3 8,758.1 5,952,527.5 386,968.5 0.4 9,865.31 MWD+IFR2+HDS+MS (8) 11,865.0 82.13 122.62 3,663.8 3,617.4 -4,901.3 8,783.1 5,952,511.1 386,993.2 0.3 9,894.81 MWD+IFR2+HDS+MS (8) 11,895.0 82.24 122.72 3,667.8 3,621.4 -4,917.3 8,808.2 5,952,494.6 387,018.0 0.5 9,924.32 MWD+IFR2+HDS+MS (8) 11,925.0 82.30 122.45 3,671.9 3,625.5 -4,933.3 8,833.2 5,952,478.2 387,042.8 0.9 9,953.83 MWD+IFR2+HDS+MS (8) 11,955.0 82.40 121.88 3,675.9 3,629.5 -4,949.1 8,858.4 5,952,462.0 387,067.7 1.9 9,983.32 MWD+IFR2+HDS+MS (8) 11,985.0 82.34 121.32 3,679.8 3,633.4 -4,964.7 8,883.7 5,952,446.0 387,092.8 1.9 10,012.77 MWD+IFR2+HDS+MS (8) 12,015.0 82.47 120.95 3,683.8 3,637.4 -4,980.1 8,909.2 5,952,430.2 387,118.0 1.3 10,042.19 MWD+IFR2+HDS+MS (8) 12,045.0 82.34 120.84 3,687.8 3,641.4 -4,995.4 8,934.7 5,952,414.5 387,143.2 0.6 10,071.59 MWD+IFR2+HDS+MS (8) 12,075.0 82.38 120.74 3,691.8 3,645.4 -5,010.6 8,960.2 5,952,398.9 387,168.5 0.4 10,100.98 MWD+IFR2+HDS+MS (8) 12,105.0 82.39 120.73 3,695.7 3,649.3 -5,025.8 8,985.8 5,952,383.3 387,193.8 0.0 10,130.37 MWD+IFR2+HDS+MS (8) 12,135.0 82.40 120.97 3,699.7 3,653.3 -5,041.0 9,011.3 5,952,367.7 387,219.1 0.8 10,159.77 MWD+IFR2+HDS+MS (8) 12,165.0 82.39 121.23 3,703.7 3,657.3 -5,056.4 9,036.8 5,952,351.9 387,244.3 0.9 10,189.19 MWD+IFR2+HDS+MS (8) 12,195.0 82.33 121.44 3,707.7 3,661.3 -5,071.9 9,062.2 5,952,336.0 387,269.4 0.7 10,218.62 MWD+IFR2+HDS+MS (8) 12,225.0 82.36 121.47 3,711.7 3,665.3 -5,087.4 9,087.5 5,952,320.1 387,294.6 0.1 10,248.06 MWD+IFR2+HDS+MS (8) 12,255.0 82.37 121.48 3,715.7 3,669.3 -5,102.9 9,112.9 5,952,304.2 387,319+7 0.0 10,277.50 MWD+IFR2+HDS+MS (8) 12,285.0 82.39 121.47 3,719.6 3,673.2 -5,118.4 9,138.3 5,952,288.2 387,344.8 0.1 10,306.95 MWD+IFR2+HDS+MS (8) 12,315.0 82.36 121.30 3,723.6 3,677.2 -5,133.9 9,163.6 5,952,272.3 387,369.9 0.6 10,336.38 MWD+IFR2+HDS+MS (8) 12,345.0 82.43 121.10 3,72T6 3,681.2 -5,149.3 9,189.1 5,952,256.5 387,395.1 0.7 10,365.81 MWD+IFR2+HDS+MS (8) 12,375.0 82.39 120.93 3,731.5 3,685.1 -5,164.6 9,214.6 5,952,240.8 387,420.3 0.6 10,395.22 MWD+IFR2+HDS+MS (8) 12,405.0 82.49 121.07 3,735.5 3,689.1 -5,179.9 9,240.0 5,952,225.1 387,445.5 0.6 10,424.63 MWD+IFR2+HDS+MS (8) 12,435.0 82.72 121.32 3,739A 3,693.0 -5,195.4 9,265.5 5,952,209.2 387,470.7 1.1 10,454.07 MWD+IFR2+HDS+MS (8) 12,465.0 82.78 121.56 3,743.1 3,696.7 -5,210.9 9,290.9 5,952,193.3 387,495.9 0.8 10,483.53 MWD+IFR2+HDS+MS (8) 12,495+0 82.77 121.78 3,746.9 3,700.5 -5,226.5 9,316.2 5,952,177.3 387,520.9 0.7 10,513.02 MWD+IFR2+HDS+MS (8) 12,525.0 83.28 121.98 3,750.6 3,704.2 -5,242.2 9,341.5 5,952,161.1 387,546.0 1.8 10,542.53 MWD+IFR2+HDS+MS (8) 12,555.0 83.23 122.18 3,754.1 3,707.7 -5,258.1 9,366.7 5,952,144.9 387,570.9 0.7 10,572.08 MWD+IFR2+HDS+MS (8) 12,585.0 83.47 122.34 3,757.6 3,711.2 -5,274.0 9,391.9 5,952,128.6 387,595.9 1.0 10,601.64 MWD+IFR2+HDS+MS (8) 12,615.0 83.23 122.45 3,761.0 3,714.6 -5,289.9 9,417.1 5,952,112.2 387,620.8 0.9 10,631.21 MWD+IFR2+HDS+MS (8) 12,645.0 83.31 122.57 3,764.5 3,718.1 -5,305.9 9,442.2 5,952,095.8 387,645.6 0.5 10,660.78 MWD+IFR2+HDS+MS (8) 12,675.0 83.30 122.74 3,768.0 3,721.6 -5,322.0 9,467.3 5,952,079.3 387,670.5 0.6 10,690.36 MWD+IFR2+HDS+MS (8) 12,705.0 83.20 123.04 3,771.6 3,725.2 -5,338.2 9,492.3 5,952,062.8 387,695.2 1.0 10,719.95 MWD+IFR2+HDS+MS (8) 12,735.0 83.14 123.35 3,775.1 3,728.7 -5,354.5 9,517.3 5,952,046.1 387,719.9 1.0 10,749.56 MWD+IFR2+HDS+MS (8) 12,765.0 82.56 123.61 3,778.9 3,732.5 -5,370.9 9,542.1 5,952,029.2 387,744.4 2.1 10,779.16 MWD+IFR2+HDS+MS (8) 12,795.0 82.81 123.78 3,782.7 3,736.3 -5,387.4 9,566.8 5,952,012.3 387,768.9 1.0 10,808.77 MWD+IFR2+HDS+MS (8) 12,825.0 82.68 123.93 3,786+5 3,740.1 -5,404.0 9,591.6 5,951,995.4 387,793.3 0.7 10,838.38 MWD+IFR2+HDS+MS (8) 12,855.0 82.72 124.09 3,790.3 3,743.9 -5,420.7 9,616.2 5,951,978.3 387,817.7 0.5 10,868.00 MWD+IFR2+HDS+MS (8) 12,885.0 82.68 124.23 3,794.1 3,747.7 -5,437.4 9,640.8 5,951,961.2 387,842.1 0.5 10,897.63 MWD+IFR2+HDS+MS (8) 12,915.0 82.69 124.37 3,79T9 3,751.5 -5,454.1 9,665.4 5,951,944.1 387,866.4 0.5 10,927.26 MWD+IFR2+HDS+MS (8) 12,945.0 82.68 124.51 3,801.7 3,755.3 -5,471.0 9,690.0 5,951,926.8 387,890.7 0.5 10,956.90 MWD+IFR2+HDS+MS (8) 12/23/2019 12:12:13PM Page 12 COMPASS 5000.14 Build 85H I ConocoPhillips Definitive Survey Report Company: NADConversion Local Co-ordinate Reference: Well CD4-594 Project: North Alaska ASP4 TVD Reference: CD4-594 Actual @ 46.4usft Site: CD4 Nanuq Pad MD Reference: CD4-594 Actual @ 46.4usft Well: CD4-594 North Reference: True Wellbore: CD4-594 Survey Calculation Method: Minimum Curvature Design: CD4-594 Database: EDT 14 Alaska Production Survey Map Map Vertical MD Inc Azi TVD TVDSS +N/-S +E/-W Northing Easting DLS Section (weft) (°) (°) (usft) (usft) (usft) (usft) (ft) (ft) (°/100-) (ft) Survey Tool Name 12,975.0 82.69 124.64 3,805.6 3,759.2 -5,487.8 9,714.5 5,951,909.6 387,914.9 0.4 10,986.55 MWD+IFR2+HDS+MS (8) 13,005.0 82.68 124.76 3,809A 3,763.0 -5,504.8 9,738A 5,951,892.2 387,939.1 0.4 11,016.20 MWD+IFR2+HDS+MS (8) 13,035.0 82.67 124.86 3,813+2 3,766.8 -5,521.8 9,763.4 5,951,874.8 387,963.2 0.3 11,045.86 MWD+IFR2+HDS+MS (8) 13,065.0 82.71 124.51 3,817.0 3,770.6 -5,538.7 9,787.8 5,951,857.5 387,987.4 1.2 11,075.51 MWD+IFR2+HDS+MS (8) 13,095.0 82.66 124.00 3,820.8 3,774.4 -5,555.4 9,812.4 5,951,840.4 388,011.7 1.7 11,105.14 MWD+IFR2+HDS+MS (8) 13,125.0 82.64 123.49 3,824.7 3,778.3 -5,572.0 9,837.2 5,951,823.4 388,036.2 1.7 11,134.74 MWD+IFR2+HDS+MS (8) 13,155.0 82.63 123.18 3,828.5 3,782.1 -5,588.3 9,862.0 5,951,B06.7 388,060.8 1.0 11,164.32 MWD+IFR2+HDS+MS (8) 13,185.0 82.64 123.01 3,832.4 3,786.0 -5,604.6 9,887.0 5,951,790.1 388,085.4 0.6 11,193.89 MWD+IFR2+HDS+MS (8) 13,215.0 82.71 122.84 3,836.2 3,789.8 -5,620.7 9,911.9 5,951,773.5 388,110.1 0.6 11,223.45 MWD+IFR2+HDS+MS (8) 13,245.0 82.66 122.82 3,840.0 3,793.6 -5,636.9 9,936.9 5,951,756.9 388,134.9 0.2 11,253.00 MWD+IFR2+HDS+MS(8) 13,275.0 82.74 122.99 3,843.8 3,797.4 -5,653.0 9,961.9 5,951,740.4 388,159.6 0.6 11,282.56 MWD+IFR2+HDS+MS (8) 13,305.0 82.69 123.16 3,847.6 3,801.2 -5,669.3 9,986.8 5,951,723.7 388,184.3 0.6 11,312.13 MWD+IFR2+HDS+MS (8) 13,335.0 82.68 123.21 3,851.5 3,805.1 -5,685.6 10,011.8 5,951,707.1 388,208.9 0.2 11,341.71 MWD+IFR2+HDS+MS (8) 13,365.0 82.66 123.00 3,855.3 3,808.9 -5,701.8 10,036.7 5,951,690.4 388,233.5 0.7 11,371.28 MWD+IFR2+HDS+MS (8) 13,395.0 82.66 122.78 3,859.1 3,812.7 -5,718.0 10,061.7 5,951,673.8 388,258.3 0.7 11,400.83 MWD+IFR2+HDS+MS (8) 13,425.0 82.57 122.61 3,863.0 3,816.6 -5,734.0 10,086.7 5,951,657.4 388,283.0 0.6 11,430.37 MWD+IFR2+HDS+MS (8) 13,455.0 82.46 122.58 3,866.9 3,820.5 -5,750.1 10,111.8 5,951,640.9 388,307.8 0.4 11,459.90 MWD+IFR2+HDS+MS (8) 13,485.0 82.50 122.57 3,870.8 3,824.4 -5,766.1 10,136.8 5,951,624.5 388,332.6 0.1 11,489.43 MWD+IFR2+HDS+MS (8) 13,515.0 82.30 122.56 3,874.8 3,828.4 -5,782.1 10,161.9 5,951,608.1 388,357.4 0.7 11,516.95 MWD+IFR2+HDS+MS (8) 13,545.0 82.30 122.63 3,878.8 3,832.4 -5,798.1 10,186.9 5,951,591.7 388,382.2 0.2 11,548.46 MWD+IFR2+HDS+MS (8) 13,575.0 82.34 122.71 3,882.8 3,836.4 -5,814.2 10,212.0 5,951,575.3 388,407.0 0.3 11,577.98 MWD+IFR2+HDS+MS (8) 13,605.0 82.32 122.78 3,886.8 3,840.4 -5,830.2 10,237.0 5,951,558.8 388,431.7 0.2 11,607.50 MWD+IFR2+HDS+MS (8) 13,635.0 82.29 122.84 3,890.8 3,844.4 -5,846.3 10,262.0 5,951,542.3 388,456.4 0.2 11,637.03 MWD+IFR2+HDS+MS (8) 13,665.0 82.28 122.89 3,894.8 3,848.4 -5,862.5 10,286.9 5,951,525.7 388,481.1 0.2 11,666.56 MWD+IFR2+HDS+MS (8) 13,695.0 82.22 122.94 3,898.9 3,852.5 -5,878.6 10,311.9 5,951,509.2 388,505.8 0.3 11,696.09 MWD+IFR2+HDS+MS (8) 13,725.0 82.24 122.89 3,902.9 3,856.5 -5,894.8 10,336.8 5,951,492.6 388,530.5 0.2 11,725.62 MWD+IFR2+HDS+MS (8) 13,755.0 82.25 122.79 3,907.0 3,860.6 -5,910.9 10,361.8 5,951,476.1 388,555.2 0.3 11,755.14 MWD+IFR2+HDS+MS (8) 13,785.0 82.29 122.70 3,911.0 3,864.6 -5,927.0 10,386.8 5,951,459.6 388,580.0 0.3 11,784.67 MWD+IFR2+HDS+MS (8) 13,815.0 82.33 122.62 3,915.0 3,868.6 -5,943.0 10,411.8 5,951,443.2 388,604.7 0.3 11,814.18 MWD+IFR2+HDS+MS (8) 13,845.0 82.34 122.55 3,919.0 3,872.6 -5,959.0 10,436.9 5,951,426.8 388,629.5 0.2 11,843.70 MWD+IFR2+HDS+MS (8) 13,875.0 82.34 122.48 3,923.0 3,876.6 -5,975.0 10,462.0 5,951,410.4 388,654.3 0.2 11,873.21 MWD+IFR2+HDS+MS (8) 13,905.0 82.38 122.53 3,927.0 3,880.6 -5,991.0 10,487.0 5,951,394.0 388,679.1 0.2 11,902.72 MWD+IFR2+HDS+MS (8) 13,935.0 81.98 122.78 3,931.1 3,884.7 -6,007.0 10,512.1 5,951,377.6 388,703.9 1.6 11,932.23 MWD+IFR2+HDS+MS (8) 13,965.0 81.18 123.03 3,935.5 3,889.1 -6,023.2 10,537.0 5,951,361.0 388,728.5 2.8 11,961.71 MWD+IFR2+HDS+MS (8) 13,995.0 81.92 123.38 3,939.9 3,893.5 -6,039.4 10,561.8 5,951,344.4 388,753.1 2.7 11,991.21 MWD+IFR2+HDS+MS (8) 14,025.0 82.07 123.99 3,944.1 3,897.7 -6,055.9 10,586.5 5,951,327.5 388,77T5 2.1 12,020.76 MWD+IFR2+HDS+MS (8) 14,055.0 81.88 124.61 3,948.3 3,901.9 -6,072.6 10,611.1 5,951,310.4 388,801.8 2.1 12,050.35 MWD+IFR2+HDS+MS (8) 14,085.0 81.64 125.27 3,952.6 3,906.2 -6,089.6 10,635.4 5,951,293.0 388,825.9 2.3 12,079.94 MWD+IFR2+HDS+MS (8) 14,115.0 81.37 126.13 3,957.0 31910.6 -6,106.9 10,659.5 5,951,275.3 388,849.7 3.0 12,109.55 MWD+IFR2+HDS+MS (8) 14,145.0 81.13 127.01 3,961.6 3,915.2 -6,124.6 10,683.3 5,951,257.2 388,873.2 &0 12,139.16 MWD+IFR2+HDS+MS (8) 12/23/2019 12:12:13PM Page 13 COMPASS 5000.14 Build 85H ConocoPhillips Definitive Survey Report Company: NADConversion Local Coordinate Reference: Well CD4-594 Project: North Alaska ASP4 TVD Reference: CD4-594 Actual @ 46.4usft Site: CD4 Nanuq Pad MD Reference: CD4-594 Actual @ 46.4usft Well: CD4-594 North Reference: True Wellbore: CD4-594 Survey Calculation Method: Minimum Curvature Design: CD4-594 Database: EDT 14 Alaska Production Survey Map Map Vertical MD Inc AN TVD TVDSS +N1-S +EI-W Northing Easting DLS Section (usft) (°) (°) (usft) (usft) (usft) (usft) (ft) (ft) (°1100-) (ft) Survey Tool Name 14,175.0 80.93 127.84 3,966.3 3,919.9 -6,142.6 10,706.8 5,951,238.8 388,896.4 2.8 12,168.77 MWD+IFR2+HDS+MS (8) 14,205.0 80.85 128.36 3,971.0 3,924.6 -6,160.9 10,730.2 5,951,220.2 388,919.4 1.7 12,198.38 MWD+IFR2+HDS+MS (8) 14,235.0 80.93 128.81 3,975.8 3,929.4 -6,179.4 10,753.3 5,951,201.4 388,942.3 1.5 12,228.00 MWD+IFR2+HDS+MS (8) 14,265.0 80.86 129.25 3,980.5 3,934.1 -6,198.0 10,776.3 5,951,182.3 388,965.0 1.5 12,257.62 MWD+IFR2+HDS+MS (8) 14,295.0 80.88 129.37 3,985.3 3,938.9 -6,216.8 10,799.2 5,951,163.2 388,987.6 0.4 12,287.24 MWD+IFR2+HDS+MS (8) 14,325.0 80.84 129.36 3,990.0 3,943.6 -6,235.6 10,822.1 5,951,144.0 389,010.2 0.1 12,316.86 MWD+IFR2+HDS+MS (8) 14,355.0 80.94 129.35 3,994.8 3,948.4 -6,254.4 10,845.0 5,951,124.9 389,032.8 0.3 12,346.48 MWD+IFR2+HDS+MS (8) 14,385.0 81.11 129.42 3,999.5 3,953.1 -6,273.2 10,867.9 5,951,105.7 389,055.4 0.6 12,376.12 MWD+IFR2+HDS+MS (8) 14,415.0 81.04 129.55 4,004.1 3,957.7 -6,292.0 10,890.8 5,951,086.5 389,078.0 0.5 12,405.75 MWD+IFR2+HDS+MS (8) 14,445.0 81.08 129.68 4,008.8 3,962.4 -6,310.9 10,913.6 5,951,067.3 389,100.5 0.4 12,435.39 MWD+IFR2+HDS+MS (8) 14,475.0 81.09 129.76 4,013.4 3,967.0 -6,329.8 10,936.4 5,951,047.9 389,123.0 0.3 12,465.03 MWD+IFR2+HDS+MS (8) 14,505.0 81.04 129.81 4,018.1 3,971.7 -6,348.8 10,959.2 5,951,028.6 389,145.4 0.2 12,494.66 MWD+IFR2+HDS+MS (8) 14,535.0 81.09 129.85 4,022.7 3,976.3 -6,367.8 10,982.0 5,951,009.3 389,167.9 0.2 12,524.30 MWD+IFR2+HDS+MS (8) 14,565.0 81.08 129.95 4,027.4 3,981.0 -6,386.8 11,004.7 5,950,989.9 389,190.3 0.3 12,553.93 MWD+IFR2+HDS+MS (8) 14,595.0 81.15 130.16 4,032.0 3,985.6 -6,405.9 11,027.4 5,950,970.5 389,212.7 0.7 12,583.57 MWD+IFR2+HDS+MS (8) 14,625.0 81.15 130.37 4,036.6 3,990.2 -6,425.0 11,050.0 5,950,950.9 389,235.0 0.7 12,613.21 MWD+IFR2+HDS+MS (8) 14,655.0 81.12 130.68 4,041.3 3,994.9 -6,444.3 11,072.5 5,950,931+3 389,257.2 1.0 12,642.85 MWD+IFR2+HDS+MS (8) 14,685.0 81.14 131.30 4,045.9 3,999.5 -6,463.7 11,094.9 5,950,911.5 389,279.2 2.0 12,672+48 MWD+IFR2+HDS+MS (8) 14,707.6 81.10 131.78 4,049.4 4,003.0 -6,478.5 11,111.6 5,950,896.5 389,295.7 2.1 12,694.77 MWD+IFR2+HDS+MS (8) 14,767.0 81.07 131.43 4,058.E 4,012.2 -6,517+5 11,155.5 5,950,856.8 389,338.9 0.6 12,753.44 NOT an Actual Survey 7" 14,805.7 81.05 131.21 4,064.6 4,018.2 -6,542.8 11,184.2 5,950,831.1 389,367.3 0.6 12,791.68 MWD+IFR2+HDS+MS (9) 14,835.0 81.04 131.91 4,069.2 4,022.8 -6,562.0 11,205+9 5,950,811.5 389,388.6 2.4 12,820.57 MWD+IFR2+HDS+MS (9) 14,865.0 80.92 132.63 4,073.9 4,027.5 -6,581.9 11,227.8 5,950,791.2 389,410.2 2.4 12,850.17 MWD+IFR2+HDS+MS (9) 14,895.0 80.84 133.32 4,078.6 4,032.2 -6,602.1 11,249.5 5,950,770.7 389,431.5 2.3 12,879.73 MWD+IFR2+HDS+MS (9) 14,925.0 80.91 133.44 4,083.4 4,037+0 -6,622.4 11,271.0 5,950,750.0 389,452.7 0.5 12,909.28 MWD+IFR2+HDS+MS (9) 14,955.0 80.89 133.36 4,088+1 4,041.7 -6,642.8 11,292.5 5,950,729.3 389,473.9 0.3 12,938.84 MWD+IFR2+HDS+MS (9) 14,985.0 81.04 133.28 4,092.8 4,046.4 -6,663.1 11,314.1 5,950,708.7 389,495.1 0.6 12,968.40 MWD+IFR2+HDS+MS (9) 15,015.0 81.04 133.64 4,097.5 4,051.1 -6,683.5 11,335.6 5,950,687.9 389,516.3 1.2 12,997.96 MWD+IFR2+HDS+MS (9) 15,045.0 80.89 134.23 4,102.2 4,055.8 -6,704.0 11,356.9 5,950,667.0 389,537.3 2.0 13,027.50 MWD+IFR2+HDS+MS (9) 15,075.0 80.87 134.83 4,107.0 4,060.6 -6,724.8 11,378.0 5,950,645.9 389,558.1 2.0 13,057.01 MWD+IFR2+HDS+MS (9) 15,105.0 81.00 135.43 4,111.7 4,065.3 -6,745.8 11,398.9 5,950,624.6 389,578.6 2.0 13,086.49 MWD+IFR2+HDS+MS (9) 15,135.0 81.26 136.04 4,116.3 4,069.9 -6,767.0 11,419.6 5,950,603.0 389,599.0 2.2 13,115,96 MWD+IFR2+HDS+MS (9) 15,165.0 81.43 136.65 4,120.8 4,074.4 -6,788.5 11,440.1 5,950,581.2 389,619.1 2.1 13,145.40 MWD+IFR2+HDS+MS (9) 15,195.0 81.51 137.33 4,125.3 4,078.9 -6,810.2 11,460.3 5,950,559.2 389,639.0 2.3 13,174.82 MWD+IFR2+HDS+MS (9) 15,225.0 81.54 138.18 4,129.7 4,083.3 -6,832.2 11,480.3 5,950,536.9 389,658.6 2.8 13,204.18 MWD+IFR2+HDS+MS (9) 15,255.0 81.42 139.04 4,134.2 4,087.8 -6,854.4 11,499.9 5,950,514.4 389,677.8 2.9 13,233.48 MWD+IFR2+HDS+MS (9) 15,285.0 81.51 139.84 4,138.6 4,092.2 -6,876.9 11,519.2 5,950,491.5 389,696.7 2.7 13,262.70 MWD+IFR2+HDS+MS (9) 15,315.0 81.69 140.39 4,143.0 4,096.6 -6,899.7 11,538.2 5,950,468.4 389,715.4 1.9 13,291.87 MWD+IFR2+HDS+MS (9) 15,345.0 81.85 140.91 4,147.3 4,100.9 -6,922.7 11,557.1 5,950,445.2 389,733.8 1.8 13,321.00 MWD+IFR2+HDS+MS (9) 15,375.0 81.86 141.55 4,151.5 4,105.1 -6,945.8 11,575.7 5,950,421.7 389,752.1 2.1 13,350.08 MWD+IFR2+HDS+MS (9) 1223/2019 12.12.13PM Page 14 COMPASS 5000.14 Build 85H ConocoPhillips Definitive Survey Report Company: NADConversion Local Co-ordinate Reference: Well CD4-594 Project: North Alaska ASP4 ND Reference: CD4-594 Actual @ 46.4usft Site: CD4 Nanuq Pad MD Reference: CD4-594 Actual @ 46.4usft Well: CD4-594 North Reference: True Wellbore: CD4-594 Survey Calculation Method: Minimum Curvature Design: CD4-594 Database: EDT 14 Alaska Production Survey Map Map Vertical MD Inc Azi TVD TVDSS +N/-S +E/-W Northing Easting DLS Section (usft) (°) (°) (usft) (usft) (usft) (usft) (ft) (ft) (°/100') (ft) Survey Tool Name 15,405.0 81.72 143.12 4,155.8 4,109.4 -6,969.3 11,593.8 5,950,397.9 389,769.8 5.2 13,379.03 MWD+IFR2+HDS+MS (9) 15,435.0 81.58 144.82 4,160.2 4,113.8 -6,993.3 11,611.3 5,950,373.7 389,786.9 5.6 13,407.77 MWD+IFR2+HDS+MS (9) 15,465.0 81.44 146.48 4,164.6 4,118.2 -7,017.8 11,628.0 5,950,348.9 389,803.2 5.5 13,436.27 MWD+IFR2+HDS+MS (9) 15,495.0 81.36 147.65 4,169.1 4,122.7 -7,042.7 11,644.1 5,950,323.8 389,818.9 3.9 13,464.55 MWD+IFR2+HDS+MS (9) 15,525.0 81.34 148.70 4,173.6 4,127.2 -7,067.9 11,659.8 5,950,298.3 389,834.2 3.5 13,492.65 MWD+IFR2+HDS+MS (9) 15,555.0 81.51 149.72 4,178.1 4,131.7 -7,093.4 11,674.9 5,950,272.6 389,848.9 3.4 13,520.57 MWD+IFR2+HDS+MS (9) 15,585.0 81.80 150.01 4,182.4 4,136.0 -7,119.1 11,689.9 5,950,246.7 389,863.4 1.4 13,548.40 MWD+IFR2+HDS+MS (9) 15,615.0 81.74 150.02 4,186.7 4,140.3 -7,144.8 11,704.7 5,950,220.7 389,877.8 0.2 13,576.21 MWD+IFR2+HDS+MS (9) 15,645.0 81.72 150.03 4,191.0 4,144.6 -7,170.5 11,719.5 5,950,194.8 389,892.3 0.1 13,604.01 MWD+IFR2+HDS+MS (9) 15,675.0 81.74 149.94 4,195.4 4,149.0 -7,196.2 11,734.4 5,950,168.8 389,906.7 0.3 13,631.82 MWD+IFR2+HDS+MS (9) 15,705.0 81.92 149.75 4,199.6 4,153.2 -7,221.9 11,749.3 5,950,142.9 389,921.2 0.9 13,659.67 MWD+IFR2+HDS+MS (9) 15,735.0 82.30 149.56 4,203.7 4,157.3 -7,247.5 11,764.3 5,950,117.0 389,935.8 1.4 13,687.56 MWD+IFR2+HDS+MS (9) 15,765.0 82.96 149.34 4,207.6 4,161.2 -7,273.2 11,779.4 5,950,091.2 389,950.5 2.3 13,715.53 MWD+IFR2+HDS+MS (9) 15,795.0 83.55 149.05 4,211.1 4,164.7 -7,298.8 11,794.7 5,950,065.3 389,965.3 2.2 13,743.58 MWD+IFR2+HDS+MS (9) 15,825.0 84.02 148.76 4,214.4 4,168.0 -7,324.3 11,810.1 5,950,039.6 389,980.3 1.8 13,771.71 MWD+IFR2+HDS+MS (9) 15,855.0 84.50 148.55 4,217.4 4,171.0 -7,349.8 11,825.6 5,950,013.8 389,995.4 1.7 13,799.91 MWD+IFR2+HDS+MS (9) 15,885.0 85.06 148.54 4,220.1 4,173.7 -7,375.3 11,841.2 5,949,988.1 390,010.6 1.9 13,828.15 MWD+IFR2+HDS+MS (9) 15,915.0 85.91 148.55 4,222.4 4,176.0 -7,400.8 11,856.8 5,949,962.3 390,025.8 2.8 13,856.42 MWD+IFR2+HDS+MS (9) 15,945.0 86.56 148.57 4,224.4 4,178.0 -7,426.3 11,872.4 5,949,936.5 390,041.0 2.2 13,884.71 MWD+IFR2+HDS+MS (9) 15,975.0 87.19 148.66 4,226.1 4,179.7 -7,451.9 11,888.0 5,949,910.7 390,056.2 2.1 13,913.02 MWD+IFR2+HDS+MS (9) 16,005.0 87.98 148.76 4,227.3 4,180.9 -7,477.5 11,903.6 5,949,884.9 390,071.3 2.7 13,941.32 MWD+IFR2+HDS+MS (9) 16,035.0 88.24 148.83 4,228.3 4,181.9 -7,503.2 11,919.1 5,949,859.0 390,086.4 0.9 13,969.62 MWD+IFR2+HDS+MS (9) 16,065.0 88.26 148.51 4,229.2 4,182.8 -7,528.8 11,934.7 5,949,833.1 390,101.6 1.1 13,997.94 MWD+IFR2+HDS+MS (9) 16,095.0 88.26 148.10 4,230.1 4,183.7 -7,554.3 11,950.5 5,949,807.4 390,116.9 1.4 14,026.33 MWD+IFR2+HDS+MS (9) 16,125.0 88.24 147.71 4,231.0 4,184.6 -7,579.7 11,966.4 5,949,781.7 390,132.5 1.3 14,054.78 MWD+IFR2+HDS+MS (9) 16,155.0 88.29 147.94 4,232.0 4,185.6 -7,605.1 11,982.4 5,949,756.1 390,148.0 0.8 14,083.25 MWD+IFR2+HDS+MS (9) 16,185.0 88.32 148.40 4,232.8 4,186.4 -7,630.5 11,998.2 5,949,730.3 390,163.4 1.5 14,111.66 MWD+IFR2+HDS+MS (9) 16,215.0 88.36 148.87 4,233.7 4,187.3 -7,656.2 12,013.8 5,949,704.5 390,178.6 1.6 14,139.99 MWD+IFR2+HDS+MS (9) 16,245.0 88.35 149.15 4,234.6 4,188.2 -7,681.9 12,029.2 5,949,678.5 390,193.6 0.9 14,168.25 MWD+IFR2+HDS+MS (9) 16,275.0 88.29 149.33 4,235.5 4,189.1 -7,707.6 12,044.6 5,949,652.5 390,208.5 0.6 14,196.48 MWD+IFR2+HDS+MS (9) 16,305.0 88.35 149.51 4,236.3 4,189+9 -7,733.4 12,059.8 5,949,626.5 390,223A 0.6 14,224.67 MWD+IFR2+HDS+MS (9) 16,335.0 87.74 149.65 4,237.4 4,191.0 -7,759.3 12,075.0 5,949,600.4 390,238.1 2.1 14,252.83 MWD+IFR2+HDS+MS (9) 16,365.0 87.05 149.75 4,238.7 4,192.3 -7,785.2 12,090.1 5,949,574.3 390,252.8 2.3 14,280.96 MWD+IFR2+HDS+MS (9) 16,395.0 87.21 149.86 4,240.2 4,193.8 -7,811.1 12,105.2 5,94%548.1 390,267.5 0.6 14,309.06 MWD+IFR2+HDS+MS (9) 16,425.0 87.40 150.06 4,241.6 4,195.2 -7,837.0 12,120.2 5,949,521.9 390,282.1 0.9 14,337.14 MWD+IFR2+HDS+MS (9) 16,455.0 87.17 150.43 4,243.1 4,196.7 -7,863.0 12,135.1 5,949,495.7 390,296.5 1.5 14,365.16 MWD+IFR2+HDS+MS (9) 16,485.0 86.71 150.81 4,244.7 4,198.3 -7,889.1 12,149.8 5,949,469.3 390,310.8 2.0 14,393.11 MWD+IFR2+HDS+MS (9) 16,515.0 86.27 150.93 4,246.5 4,200.1 -7,915.3 12,164.3 5,949,443.0 390,324.9 1.5 14,420.99 MWD+IFR2+HDS+MS (9) 16,545.0 86.31 150.27 4,248.4 4,202.0 -7,941.4 12,179.0 5,949,416+6 390,339.2 2.2 14,448.92 MWD+IFR2+HDS+MS (9) 16,575.0 86.28 149.56 4,250.4 4,204.0 -7,967.3 12,194.0 5,949,390.5 390,353.8 2.4 14,476.98 MWD+IFR2+HDS+MS (9) 12/232019 12:12:13PM Page 15 COMPASS 5000.14 Build 85H ConocoPhillips ( Definitive Survey Report Company: NADConversion Local Co-ordinate Reference: Well CD4-594 Project: North Alaska ASP4 TVD Reference: CD4-594 Actual @ 46.4usft Site: CD4 Nanuq Pad MD Reference: CD4-594 Actual @ 46.4usft Well: CD4-594 North Reference: True Wellbore: CD4-594 Survey Calculation Method: Minimum Curvature Design: CD4-594 Database: EDT 14 Alaska Production Survey Map Map Vertical MD Inc Azi TVD TVDSS +N/-S +E/-W Northing Easting DLS Section (usft) (°) (°) (usft) (usft) (usft) (usft) (ft) (ft) (°/100') (ft) Survey Tool Name 16,605.0 86.44 149.01 4,252.3 4,205.9 -7,993.0 12,209+3 5,949,364.5 390,368.7 1.9 14,505.15 MWD+IFR2+HDS+MS (9) 16,635.0 86.35 149.19 4,254.2 4,20T8 -8,018.7 12,224.7 5,949,338.6 390,383.6 0.7 14,533.36 MWD+IFR2+HDS+MS (9) 16,665.0 86.27 149.46 4,256.1 4,209.7 -8,044.5 12,240.0 5,949,312.6 390,398.5 0.9 14,561.52 MWD+IFR2+HDS+MS (9) 16,695.0 86.33 149.74 4,258.0 4,211.6 -8,070.3 12,255.1 5,949,286.5 390,413.2 1.0 14,589.63 MWD+IFR2+HDS+MS (9) 16,725.0 86.72 150.05 4,259.8 4,213.4 -8,096.2 12,270.2 5,949,260.4 390,427.8 1.7 14,617.70 MWD+IFR2+HDS+MS (9) 16,755.0 87.30 150.37 4,261.4 4,215.0 -8,122.2 12,285.0 5,949,234.2 390,442.3 2.2 14,645.73 MWD+IFR2+HDS+MS (9) 16,785.0 87.28 150.70 4,262.8 4,216.4 -8,148.3 12,299.8 5,949,207.8 390,456.6 1.1 14,673.70 MWD+IFR2+HDS+MS (9) 16,815.0 87.27 150.99 4,264.3 4,217.9 -8,174.4 12,314.4 5,949,181.4 390,470.7 1.0 14,701.61 MWD+IFR2+HDS+MS (9) 16,845.0 87.25 151.28 4,265.7 4,219.3 -8,200.7 12,328.8 5,949,155.0 390,484.8 1.0 14,729.46 MWD+IFR2+HDS+MS (9) 16,875.0 I 87.20 151.57 4,26T1 4,220.7 -8,227.0 12,343.2 5,949,128.4 390,498.7 1.0 14,757.26 MWD+IFR2+HDS+MS (9) 16,905.0 87.26 151.61 4,268.6 4,222.2 -8,253.4 12,357.4 5,949,101.8 390,512.5 0.2 14,785.03 MWD+IFR2+HDS+MS (9) 16,935.0 87.31 151.50 4,270.0 4,223.6 -8,279.7 12,371.7 5,949,075.3 390,526.3 0.4 14,812.80 MWD+IFR2+HDS+MS (9) 16,965.0 87.27 151.39 4,271.4 4,225.0 -8,306.0 12,386.0 5,949,048+7 390,540.2 0.4 14,840.60 MWD+IFR2+HDS+MS (9) 16,995.0 87.15 151.39 4,272.9 4,226.5 -8,332.3 12,400.4 5,949,022.2 390,554.2 0.4 14,868.40 MWD+IFR2+HDS+MS (9) 17,025.0 87.25 151.46 4,274.4 4,228.0 -8,358.6 12,414.7 5,948,995.6 390,568.1 0.4 14,896.20 MWD+IFR2+HDS+MS (9) 17,055.0 87.23 151.54 4,275.8 4,229.4 -8,385.0 12,429.0 5,948,969.1 390,581.9 0.3 14,923.98 MWD+IFR2+HDS+MS (9) 17,085.0 87.25 151.49 4,277.2 4,230.8 -8,411.3 12,443.3 5,948,942.5 390,595.8 0.2 14,951.76 MWD+IFR2+HDS+MS (9) 17,115.0 87.51 151.22 4,278.6 4,232.2 -8,437.6 12,457.7 5,948,916.0 390,609.7 1.2 14,979.58 MWD+IFR2+HDS+MS (9) 17,145.0 87.80 150.95 4,279.8 4,233.4 -8,463.9 12,472.2 5,948,889.5 390,623.8 1.3 15,007.45 MWD+IFR2+HDS+MS (9) 17,175.0 87.80 150.76 4,281.0 4,234.6 -8,490.0 12,486.8 5,948,863.1 390,638.0 0.6 15,035.37 MWD+IFR2+HDS+MS(9) 17,205.0 87.77 150.76 4,282.2 4,235.8 -8,516.2 12,501.4 5,948,836.7 390,652.2 0.1 15,063.31 MWD+IFR2+HDS+MS (9) 17,235.0 88.05 150.77 4,283.3 4,236.9 -8,542.4 12,516.0 5,948,810.3 390,666.4 0.9 15,091.25 MWD+IFR2+HDS+MS (9) 17,265.0 I 88.50 150.78 4,284.2 4,237.8 -8,568.5 12,530.7 5,948,783.9 390,680.6 1.5 15,119.19 MWD+IFR2+HDS+MS (9) 17,295.0 88.81 150.76 4,284.9 4,238.5 -8,594.7 12,545.3 5,948,757.5 390,694.8 1.0 15,147.14 MWD+IFR2+HDS+MS (9) 17,325.0 88.80 150.74 4,285.5 4,239.1 -8,620.9 12,560.0 5,948,731.1 390,709.1 0.1 15,175.09 MWD+IFR2+HDS+MS (9) 17,355.0 89.19 150.75 4,286.0 4,239.6 -8,647.0 12,574.6 5,948,704.7 390,723.3 1.3 15,203.05 MWD+IFR2+HDS+MS (9) 17,385.0 89.29 150.93 4,286.4 4,240.0 -8,673.2 12,589.3 5,948,678.3 390,737.5 0.7 15,230.99 MWD+IFR2+HDS+MS (9) 17,415.0 89.29 151.14 4,286.8 4,240.4 -8,699.5 12,603.8 5,948,651.8 390,751.6 0.7 15,258.90 MWD+IFR2+HDS+MS (9) 17,445.0 89.26 151.34 4,287.2 4,240.8 -8,725.8 12,618.2 5,948,625.3 390,765.6 0.7 15,286.76 MWD+IFR2+HDS+MS (9) 17,475.0 89.27 151.33 4,287.5 4,241.1 -8,752.1 12,632.6 5,948,598.8 390,779.5 0.0 15,314.61 MWD+IFR2+HDS+MS (9) 17,505.0 89.30 151.26 4,287.9 4,241.5 -8,778A 12,647.0 5,948,572.2 390,793.5 0.3 15,342.46 MWD+IFR2+HDS+MS (9) 17,535.0 89.30 151.18 4,288.3 4,241.9 -8,804.7 12,661.5 5,948,545.7 390,807.5 0.3 15,370.33 MWD+IFR2+HDS+MS (9) 17,565.0 89.29 151.34 4,288.7 4,242.3 -8,831.0 12,675.9 5,948,519.2 390,821.5 0.5 15,398.19 MWD+IFR2+HDS+MS (9) 17,595.0 89.26 151.62 4,289.0 4,242.6 -8,857.4 12,690.2 5,948,492.6 390,835.4 0.9 15,426.01 MWD+IFR2+HDS+MS (9) 17,625.0 89.20 151.90 4,289.4 4,243.0 -8,883.8 12,704.4 5,948,465.9 390,849.2 1.0 15,453.77 MWD+IFR2+HDS+MS (9) 17,655.0 89.18 152.01 4,289.9 4,243.5 -8,910.3 12,718.5 5,948,439.2 390,862.9 0.4 15,481.49 MWD+IFR2+HDS+MS (9) 17,685.0 89.23 151.99 4,290.3 4,243.9 -8,936.7 12,732.6 5,948,412.5 390,876.5 0.2 15,509.21 MWD+IFR2+HDS+MS (9) 17,715.0 89.26 151.97 4,290.7 4,244.3 -8,963.2 12,746.7 5,948,385.8 390,890.2 0.1 15,536.92 MWD+IFR2+HDS+MS (9) 17,745.0 89.25 151.85 4,291.1 4,244.7 -8,989.7 12,760.8 5,948,359.1 390,903.9 0.4 15,564.66 MWD+IFR2+HDS+MS (9) 17,775.0 89.29 151.57 4,291.4 4,245.0 -9,016.1 12,775.0 5,948,332.5 390,917.7 0.9 15,592.43 MWD+IFR2+HDS+MS (9) 1212312019 12:12:13PM Page 16 COMPASS 5000,14 Build 85H ConocoPhillips Definitive Survey Report Company: NADConversion Local Co-ordinate Reference: Well CD4-594 Project: North Alaska ASP4 TVD Reference: CD4-594 Actual @ 46.4usft Site: CD4 Nanuq Pad MD Reference: CD4-594 Actual @ 46.4usft Well: CD4-594 North Reference: True Wellbore: CD4-594 Survey Calculation Method: Minimum Curvature Design: CD4-594 Database: EDT 14 Alaska Production Survey Map Map Vertical MD Inc Azi TVD TVDSS +N/-S +E/-W Northing Easting DLS Section (usft) 0 (°) (usft) (usft) (usft) (usft) (ft) (ft) (-1100') (ft) Survey Tool Name 17,805.0 89.28 151.30 4,291.8 4,245.4 -9,042.5 12,789.4 5,948,305.9 390,931.6 0.9 15,620.26 MWD+IFR2+HDS+MS (9) 17,835.0 89.32 151.14 4,292.2 4,245.8 -9,068.7 12,803.8 5,948,279.4 390,945.6 0.5 15,648.12 MWD+IFR2+HDS+MS (9) 17,865.0 89.11 151.34 4,292.6 4,246.2 -9,095.0 12,818.2 5,948,252.9 390,959.6 1.0 15,675.99 MWD+IFR2+HDS+MS (9) 17,895.0 88.24 151.56 4,293.3 4,246.9 -9,121.4 12,832.6 5,948,226.3 390,973.5 3.0 15,703.81 MWD+IFR2+HDS+MS (9) 17,925.0 87.52 151.73 4,294.4 4,248.0 -9,147.8 12,846.8 5,948,199.7 390,987.3 2.5 15,731.57 MWD+IFR2+HDS+MS (9) 17,955.0 87.19 151.66 4,295.8 4,249.4 -9,174.2 12,861.0 5,948,173.1 391,001.1 1.1 15,759.32 MWD+IFR2+HDS+MS (9) 17,985.0 87.12 151.56 4,297.3 4,250.9 -9,200.5 12,875.3 5,948,146.5 391,014.9 0.4 15,787.08 MWD+IFR2+HDS+MS (9) 18,015.0 86.74 151.43 4,298.9 4,252.5 -9,226.8 12,889.6 5,948,120.0 391,028.8 1.3 15,814.86 MWD+IFR2+HDS+MS (9) 18,045.0 86.58 150.99 4,300.6 4,254.2 -9,253.1 12,904.0 5,948,093.5 391,042.8 1.6 15,842.68 MWD+IFR2+HDS+MS (9) 18,075.0 86.29 150.46 4,302.5 4,256.1 -9,279.2 12,918.6 5,948,067.1 391,057.0 2.0 15,870.60 MWD+IFR2+HDS+MS (9) 18,105.0 86.30 149.94 4,304.4 4,258.0 -9,305.2 12,933.5 5,948,040.9 391,071.4 1.7 15,898.60 MWD+IFR2+HDS+MS (9) 18,135.0 86.27 149.61 4,306.4 4,260.0 -9,331.0 12,948.6 5,948,014.8 391,086.1 1.1 15,926.68 MWD+IFR2+HDS+MS (9) 18,165.0 86.42 149.36 4,308.3 4,261.9 -9,356.8 12,963.8 5,947,988.8 391,100.9 1.0 15,954.82 MWD+IFR2+HDS+MS (9) 18,195.0 86.24 149.11 4,310.2 4,263.8 -9,382.6 12,979.1 5,947,962.8 391,115.8 1.0 15,983.00 MWD+IFR2+HDS+MS (9) 18,225.0 85.93 148.98 4,312.3 4,265.9 -9,408.2 12,994.5 5,947,936.9 391,130.7 1.1 16,011.21 MWD+IFR2+HDS+MS(9) 18,255.0 85.71 148.94 4,314.4 4,268.0 -9,433.9 13,009.9 5,947,911.0 391,145.7 0.7 16,039.42 MWD+IFR2+HDS+MS (9) 18,285.0 85.77 148.89 4,316.7 4,270.3 -9,459.5 13,025.4 5,947,885.2 391,160.8 0.3 16,067.63 MWD+IFR2+HDS+MS (9) 18,315.0 86.46 148.69 4,318.7 4,272.3 -9,485.1 13,040.9 5,947,859.3 391,175.9 2.4 16,095.88 MWD+IFR2+HDS+MS (9) 18,345.0 87.29 148.30 4,320.3 4,273.9 -9,510.6 13,056.5 5,947,833.5 391,191.1 3.1 16,124.21 MWD+IFR2+HDS+MS (9) 18,375.0 88.09 147.91 4,321.6 4,275.2 -9,536.1 13,072A 5,947,807.8 391,206.5 3.0 16,152+62 MWD+IFR2+HDS+MS (9) 18,405.0 88.95 147.71 4,322.3 4,275.9 -9,561.5 13,088.3 5,947,782.2 391,222.1 2.9 16,181.09 MWD+IFR2+HDS+MS (9) 18,435.0 89.65 147.87 4,322.7 4,276.3 -9,586.8 13,104.3 5,947,756.6 391,237.7 2.4 16,209.57 MWD+IFR2+HDS+MS (9) 18,465.0 90.16 148.03 4,322.7 4,276.3 -9,612.3 13,120.3 5,947,730.9 391,253.2 1.8 16,238.03 MWD+IFR2+HDS+MS (9) 18,495.0 90.72 148.15 4,322.5 4,276.1 -9,637.7 13,136.1 5,947,705.2 391,268.6 1.9 16,266.46 MWD+IFR2+HDS+MS (9) 18,525+0 91.20 148.13 4,322.0 4,275.6 -9,663.2 13,151.9 5,947,679.4 391,284.0 1.6 16,294.89 MWD+IFR2+HDS+MS (9) 18,555.0 91.68 148.10 4,321.3 4,274.9 -9,688.7 13,167.8 5,947,653.7 391,299.4 1.6 16,323.31 MWD+IFR2+HDS+MS (9) 18,585.0 92.08 148.11 4,320.3 4,273.9 -9,714.1 13,183.6 5,947,628.0 391,314.9 1.3 16,351.73 MWD+IFR2+HDS+MS (9) 18,615.0 92.35 148.34 4,319.1 4,272.7 -9,739.6 13,199.4 5,947,602.3 391,330.2 1.2 16,380.12 MWD+IFR2+HDS+MS (9) 18,645.0 92.64 148.61 4,317.8 4,271.4 -9,765.2 13,215.1 5,947,576.5 391,345.5 1.3 16,408.46 MWD+IFR2+HDS+MS (9) 18,675.0 92.55 148.81 4,316.4 4,270.0 -9,790.8 13,230+7 5,947,550.6 391,360.6 0.7 16,436.76 MWD+IFR2+HDS+MS (9) 18,705.0 92.63 148.54 4,315.1 4,268.7 -9,816.4 13,246.2 5,947,524.8 391,375.8 0.9 16,465.07 MWD+IFR2+HDS+MS (9) 18,735.0 92.65 148.19 4,313.7 4,267.3 -9,841.9 13,261.9 5,947,499.0 391,391.1 1.2 16,493.43 MWD+IFR2+HDS+MS (9) 18,765.0 92.68 147.88 4,312.3 4,265.9 -9,867.3 13,277.8 5,947,473.3 391,406.6 1.0 16,521.84 MWD+IFR2+HDS+MS (9) 18,795.0 93.03 148.12 4,310.8 4,264.4 -9,892.7 13,293.7 5,947,447.7 391,422.0 1.4 16,550.25 MWD+IFR2+HDS+MS (9) 18,825.0 93.16 148.55 4,309.2 4,262.8 -9,918.2 13,309.4 5,947,421.9 391,437.3 1.5 16,578.61 MWD+IFR2+HDS+MS (9) 18,855.0 93.15 148,98 4,307.5 4,261.1 -9,943.8 13,325.0 5,947,396.1 391,452.4 1.4 16,606.88 MWD+IFR2+HDS+MS (9) 18,885.0 93.16 149.26 4,305.9 4,259.5 -9,96R5 13,340.3 5,947,370.1 391,467.4 0.9 16,635.10 MWD+IFR2+HDS+MS (9) 18,915.0 93.16 149.48 4,304.2 4,257.8 -9,995+3 13,355.6 5,947,344.1 391,482.2 0.7 16,663.27 MWD+IFR2+HDS+MS (9) 18,945.0 93.12 149.71 4,302.6 4,256.2 -10,021.2 13,370.7 5,947,318.0 391,497.0 0.8 16,691.40 MWD+IFR2+HDS+MS (9) 18,975.0 93.10 149.75 4,301.0 4,254.6 -10,047.0 13,385.8 5,947,291.9 391,511.7 0.1 16,719.51 MWD+IFR2+HDS+MS (9) 1212312019 12:12:13PM Page 17 COMPASS 5000.14 Build 85H ConocoPhillips Definitive Survey Report Company: NADConversion Local Coordinate Reference: Well CD4-594 Project: North Alaska ASP4 TVD Reference: CD4-594 Actual @ 46.4usft Site: CD4 Nanuq Pad MD Reference: CD4-594 Actual @ 46.4usft Well: CD4-594 North Reference: True Wellbore: CD4-594 Survey Calculation Method: Minimum Curvature Design: CD4-594 Database: EDT 14 Alaska Production Survey Map Map Vertical MD Inc Azi TVD TVDSS +N/-S +E/-W Northing Easting DLS Section (usft) (°) (°) (usft) (usft) (usft) (usft) (ft) (ft) (°/100') (ft) Survey Tool Name 19,005.0 92.75 149.71 4,299.4 4,253.0 -10,072+9 13,400.9 5,947,265.8 391,526.3 1.2 16,747.62 MWD+IFR2+HDS+MS (9) 19,035.0 92.33 149.67 4,298.1 4,251.7 -10,098.8 13,416.1 5,947,239.7 391,541.0 1.4 16,775.75 MWD+IFR2+HDS+MS (9) 19,065.0 92.19 149.79 4,296.9 4,250.5 -10,124.7 13,431.2 5,947,213.6 391,555.7 0.6 16,803.88 MWD+IFR2+HDS+MS (9) 19,095.0 92.23 149.99 4,295.8 4,249.4 -10,150.6 13,446.2 5,947,187.4 391,570.3 0.7 16,831.98 MWD+IFR2+HDS+MS (9) 19,125.0 92.27 150.19 4,294.6 4,248.2 -10,176.6 13,461.2 5,947,161.2 391,584.9 0.7 16,860.04 MWD+IFR2+HDS+MS (9) 19,155.0 92.30 150.64 4,293.4 4,247.0 -10,202.6 13,476.0 5,947,134.9 391,599.2 1.5 16,888.05 MWD+IFR2+HDS+MS (9) 19,185.0 92.19 151.30 4,292.2 4,245.8 -10,228.9 13,490.5 5,947,108.4 391,613.4 2.2 16,915.94 MWD+IFR2+HDS+MS (9) 19,215.0 92.19 151.95 4,291.1 4,244.7 -10,255.2 13,504.8 5,947,081.8 391,627.2 2.2 16,943.71 MWD+IFR2+HDS+MS (9) 19,245.0 92.13 152.50 4,289.9 4,243.5 -10,281.8 13,518.7 5,947,055.1 391,640.7 1.8 16,971.37 MWD+IFR2+HDS+MS (9) 19,275.0 92.10 152.94 4,288.8 4,242.4 -10,308.4 13,532.5 5,947,028.2 391,654.0 1.5 16,998.92 MWD+IFR2+HDS+MS (9) 19,305.0 91.98 153.38 4,287.8 4,241.4 -10,335.2 13,546.0 5,947,001.2 391,667.1 1.5 17,026.38 MWD+IFR2+HDS+MS (9) 19,335.0 91.91 153.47 4,286.8 4,240.4 -10,362.0 13,559.4 5,946,974.2 391,680.1 0.4 17,053.78 MWD+IFR2+HDS+MS (9) 19,365.0 92.09 153.10 4,285.7 4,239.3 -10,388.8 13,572.9 5,946,947.2 391,693.1 1.4 17,081.22 MWD+IFR2+HDS+MS (9) 19,395.0 92.09 152.74 4,284.6 4,238.2 -10,415.4 13,586.6 5,946,920.3 391,706.4 1.2 17,108.73 MWD+IFR2+HDS+MS (9) 19,425.0 92.63 152.44 4,283.4 4,237.0 -10,442.1 13,600.3 5,946,893.5 391,719.7 2.1 17,136.30 MWD+IFR2+HDS+MS (9) 19,455.0 93.13 152.24 4,281.9 4,235.5 -10,468.6 13,614.3 5,946,866.7 391,733.2 1.8 17,163.92 MWD+IFR2+HDS+MS (9) 19,485.0 93.11 152.05 4,280.2 4,233.8 -10,495.1 13,628.3 5,946,840.0 391,746.8 0.6 17,191.56 MWD+IFR2+HDS+MS (9) 19,515.0 93.10 151.91 4,278.6 4,232.2 -10,521.5 13,642.3 5,946,813.4 391,760.4 0.5 17,219.24 MWD+IFR2+HDS+MS (9) 19,545.0 93.02 151.92 4,277.0 4,230.6 -10,548.0 13,656.4 5,946,786.7 391,774.1 0.3 17,246.94 MWD+IFR2+HDS+MS (9) 19,575.0 92.95 151.92 4,275.4 4,229.0 -10,574.4 13,670.5 5,946,760.1 391,787.7 0.2 17,274.63 MWD+IFR2+HDS+MS (9) 19,605.0 93.06 151.84 4,273.9 4,227.5 -10,600.8 13,684.7 5,946,733.4 391,801.4 0.5 17,302.34 MWD+IFR2+HDS+MS (9) 19,635.0 93.51 151.55 4,272.2 4,225.8 -10,627.2 13,698.9 5,946,706.8 391,815.2 1.8 17,330.07 MWD+IFR2+HDS+MS (9) 19,665.0 93.58 151.26 4,270.3 4,223.9 -10,653.5 13,713.2 5,946,680.3 391,829.1 1.0 17,357.85 MWD+IFR2+HDS+MS (9) 19,695.0 93.62 151.03 4,268.4 4,222.0 -10,679.7 13,727.6 5,946,653.8 391,843.1 0.8 17,385.68 MWD+IFR2+HDS+MS (9) 19,725.0 93.59 151.01 4,266.5 4,220.1 -10,705.9 13,742.1 5,946,627.4 391,857.2 0.1 17,413.53 MWD+IFR2+HDS+MS (9) 19,755.0 93.58 151.00 4,264.7 4,218.3 -10,732.1 13,756.7 5,946,601.0 391,871.3 0.0 17,441.39 MWD+IFR2+HDS+MS (9) 19,785.0 93.57 150.93 4,262.8 4,216.4 -10,758.2 13,771.2 5,946,574.6 391,885.4 0.2 17,469.26 MWD+IFR2+HDS+MS (9) 19,815.0 93.53 150.61 4,260.9 4,214.5 -10,784.4 13,785.8 5,946,548.2 391,899.6 1.1 17,497.16 MWD+IFR2+HDS+MS (9) 19,845.0 93.55 150.28 4,259.1 4,212.7 -10,810.4 13,800.6 5,946,522.0 391,913.9 1.1 17,525.12 MWD+IFR2+HDS+MS (9) 19,875.0 93.64 149.97 4,257.2 4,210.8 -10,836.4 13,815.5 5,946,495.8 391,928.4 1.1 17,553.15 MWD+IFR2+HDS+MS (9) 19,905.0 93.58 149.84 4,255.3 4,208.9 -10,862.3 13,830.5 5,946,469.6 391,943.0 0.5 17,581.21 MWD+IFR2+HDS+MS (9) 19,935.0 93.59 149.73 4,253.4 4,207.0 -10,888.2 13,845.6 5,946,443.5 391,957.7 0.4 17,609.29 MWD+IFR2+HDS+MS (9) 19,965.0 93.74 149.62 4,251.5 4,205.1 -10,914.0 13,860.7 5,946,417.4 391,972.4 0.6 17,637.40 MWD+IFR2+HDS+MS (9) 19,995.0 94.08 149.43 4,249.5 4,203.1 -10,939.8 13,875.9 5,946,391.4 391,987.1 1.3 17,665.52 MWD+IFR2+HDS+MS (9) 20,025.0 94.08 149.23 4,247.3 4,200.9 -10,965.5 13,891.1 5,946,365.4 392,002.0 0.7 17,693.67 MWD+IFR2+HDS+MS (9) 20,055.0 94.13 149.07 4,245.2 4,198.8 -10,991.2 13,906.5 5,946,339.5 392,016.9 0.6 17,721.85 MWD+IFR2+HDS+MS (9) 20,085.0 94.07 149.23 4,243.0 4,196.6 -11,016.9 13,921.8 5,946,313.5 392,031.8 0.6 17,750.03 MWD+IFR2+HDS+MS (9) 20,115.0 94.05 149.48 4,240.9 4,194.5 -11,042.7 13,937.1 5,946,287.6 392,046.6 0.8 17,778.17 MWD+IFR2+HDS+MS (9) 20,145.0 93.97 149.68 4,238.8 4,192.4 -11,068.5 13,952.2 5,946,261.5 392,061.4 0.7 17,806.28 MWD+IFR2+HDS+MS (9) 20,175.0 94.01 149.36 4,236.7 4,190.3 -11,094.3 13,967.4 5,946,235.5 392,076.1 1.1 17,834.40 MWD+IFR2+HDS+MS (9) 1212312019 12:12:13PM Page 18 COMPASS 5000.14 Build 85H ConocoPhillips ) Definitive Survey Report Company: NADConversion Local Co-ordinate Reference: Well CD4-594 Project: North Alaska ASP4 TVD Reference: CD4-594 Actual @ 46.4usft Site: CD4 Nanuq Pad MD Reference: CD4-594 Actual @ 46.4usft Well: CD4-594 North Reference: True Wellbore: CD4-594 Survey Calculation Method: Minimum Curvature Design: CD4-594 Database: EDT 14 Alaska Production Survey Map Map Vertical MD Inc Azi TVD TVDSS +N/-S +E/-W Northing Easting US Section (usft) (°) (°) (usft) (usft) (usft) (usft) (ft) (ft) (°/100') (ft) Survey Tool Name 20,205.0 94.02 148.89 4,234.6 4,188.2 -11,119.9 13,982.8 5,946,209.6 392,091.1 1.6 17,862.59 MWD+IFR2+HDS+MS(9) 20,235.0 94.03 148.42 4,232.5 4,1861 -11,145.5 13,998.3 5,946,183.7 392,106.2 1.6 17,890.86 MWD+IFR2+HDS+MS (9) 20,265.0 94.05 148.12 4,230.4 4,184.0 -11,171.0 14,014.1 5,946,158.0 392,121.5 1.0 17,919.19 MWD+IFR2+HDS+MS (9) 20,295.0 94.04 147.89 4,228.3 4,181.9 -11,196.3 14,029.9 5,946,132.4 392,137.0 0.8 17,947.57 MWD+IFR2+HDS+MS (9) 20,325.0 94.04 147.66 4,226.2 4,179.8 -11,221.7 14,045.9 5,946,106.8 392,152.5 0.8 17,975.99 MWD+IFR2+HDS+MS (9) 20,355.0 94.06 147.50 4,224.1 4,177.7 -11,246.9 14,061.9 5,946,081.3 392,168.2 0.5 18,004.44 MWD+IFR2+HDS+MS (9) 20,385.0 94.06 147.38 4,221.9 4,175.5 -11,272.1 14,078.0 5,946,055.9 392,183.9 0.4 18,032.91 MWD+IFR2+HDS+MS (9) 20,415.0 94.07 147.26 4,219.8 4,173.4 -11,297.3 14,094.2 5,946,030.4 392,199.6 0.4 18,061.40 MWD+IFR2+HDS+MS (9) 20,445.0 94.06 147.43 4,217.7 4,171.3 -11,322.5 14,110.3 5,946,005.0 392,215.3 0.6 18,089.88 MWD+IFR2+HDS+MS (9) 20,475.0 94.11 147.78 4,215.5 4,169.1 -11,347.8 14,126.4 5,945,979.4 392,231.0 1.2 18,118.32 MWD+IFR2+HDS+MS (9) 20,505.0 94.10 148.13 4,213+4 4,167.0 -11,373.1 14,142.2 5,945,953.8 392,246.4 1.2 18,146.71 MWD+IFR2+HDS+MS(9) 20,535.0 93.84 148.43 4,211.3 4,164.9 -11,398.6 14,158.0 5,945,928.1 392,261.7 1.3 18,175.04 MWD+IFR2+HDS+MS (9) 20,565.0 93.62 148.69 4,209.4 4,163.0 -11,424.1 14,173.6 5,945,902.3 392,276.9 1.1 18,203.34 MWD+IFR2+HDS+MS (9) 20,595.0 93.47 148.95 4,207.5 4,161.1 -11,449.8 14,189.1 5,945,876.5 392,292.0 1.0 18,231.59 MWD+IFR2+HDS+MS (9) 20,625.0 93.44 148.95 4,205.7 4,159.3 -11,475.4 14,204.5 5,945,850.6 392,307.1 0.1 18,259.83 MWD+IFR2+HDS+MS (9) 20,655.0 93.54 148.74 4,203.9 4,157.5 -11,501.0 14,220.0 5,945,824.7 392,322.1 0.8 18,288.09 MWD+IFR2+HDS+MS (9) 20,685.0 93.65 148.53 4,202.0 4,155.6 -11,526.6 14,235.6 5,945,798.9 392,337.3 0.8 18,316.37 MWD+IFR2+HDS+MS (9) 20,715.0 93.38 148.42 4,200.2 4,153.8 -11,552.1 14,251.3 5,945,773.1 392,352.5 1.0 18,344.69 MWD+IFR2+HDS+MS (9) 20,745.0 93.11 148.44 4,198.5 4,152.1 -11,577.7 14,267.0 5,945,747.3 392,367.8 0.9 18,373.02 MWD+IFR2+HDS+MS (9) 20,775.0 93.05 148.45 4,196.9 4,150.5 -11,603.2 14,282.6 5,945,721.6 392,383.1 0.2 18,401.36 MWD+IFR2+HDS+MS (9) 20,805.0 92.92 148.63 4,195.3 4,148.9 -11,628.7 14,298.3 5,945,695.8 392,398.3 0.7 18,429.68 MWD+IFR2+HDS+MS (9) 20,835.0 92.68 149.03 4,193.8 4,147.4 -11,654.4 14,313.8 5,945,669.9 392,413.4 1.6 18,457.95 MWD+IFR2+HDS+MS (9) 20,865.0 92.57 149.44 4,192.4 4,146.0 -11,680.1 14,329.1 5,945,643.9 392,428.3 1.4 18,486.16 MWD+IFR2+HDS+MS (9) 20,895.0 92.59 149.63 4,191.1 4,144.7 -11,706.0 14,344.3 5,945,617.8 392,443.0 0.6 18,514.32 MWD+IFR2+HDS+MS (9) 20,925.0 92.59 149.47 4,189.7 4,143.3 -11,731.8 14,359.5 5,945,591.7 392,457.8 0.5 18,542.47 MWD+IFR2+HDS+MS (9) 20,955.0 92.59 149.30 4,188.4 4,142.0 -11,757.6 14,374.8 5,945,565.7 392,472.7 0.6 18,570.65 MWD+IFR2+HDS+MS (9) 20,985.0 92.63 149.16 4,187.0 4,140.6 -11,783.3 14,390.1 5,945,539.7 392,487.6 0.5 18,598.86 MWD+IFR2+HDS+MS (9) 21,015.0 92.67 149.07 4,185.6 4,139.2 -11,809.1 14,405.5 5,945,513.7 392,502.5 0.3 18,627.09 MWD+IFR2+HDS+MS (9) 21,045.0 92.67 148.99 4,184.2 4,137.8 -11,834.7 14,420.9 5,945,487.8 392,517.5 0.3 18,655.34 MWD+IFR2+HDS+MS (9) 21,070.8 92.71 148.92 4,183.0 4,136.6 -11,856.8 14,434.2 5,945,465.5 392,530.5 0.3 18,679.65 MWD+IFR2+HDS+MS (9) 21,170.0 92.71 148.92 4,178.3 4,131.9 -11,941.7 14,485.3 5,945,379.8 392,580.2 0.0 18,773.09 PROJECTED toTD 1212312019 12:12:13PM Page 19 COMPASS 5000.14 Build 85H NADConversion North Alaska ASP4 CD4 Nanuq Pad CD4-594P H 1 ConocoPhillips Definitive Survey Report 23 December, 2019 CD4-594PH 1 Final Definitive Survey Verified and Signed -off All targets and/or well position objectives have been achieved. J Yes No l have checked to the best of my ability that the following data is correct: J Surface Coordinates C°I Declination & Convergence C] GRS Survey Corrections J Survey Tool Codes 1tl'. / �, Maa..n4i-a+wrentlmn�m�s�.P6s.unuan. SLB DE: aaron.donat@conocophffii „m , Client Representative: ps.com Date: ConocoPhilli s p ConocoPhillips Definitive Survey Report Company: NADConversion Local Co-ordinate Reference: Well CD4-594 Project: North Alaska ASP4 TVD Reference: CD4-594 Actual @ 46.4usft Site: CD4 Nanuq Pad MD Reference: CD4-594 Actual @ 46.4usft Well: CD4-594 North Reference: True Wellbore: CD4-594PH1 Survey Calculation Method: Minimum Curvature Design: CD4-594PH1 Database: EDT 14 Alaska Production 2roject North Alaska ASP4 Nap System: US State Plane 1927 (Exact solution) System Datum: Mean Sea Level 3eo Datum: NAD 1927 (NADCON CONUS) Using Well Reference Point Vlap Zone: Alaska Zone 04 Using geodetic scale factor Well CD4-594 Well Position +N/S 0.0 usft Northing: 5,957,553.49 usft Latitude: 70° 17' 33.254 N +E/-W 0.0 usft Easting: 378,291.33 usft Longitude: 150° 59' 7.378 W Position Uncertainty 0.0 usft Wellhead Elevation: 0.0 usft Ground Level: 19.0 usft Wellbore CD4-594PH1 Magnetics Model Name Sample Date Declination Dip Angle Field Strength (nT) BGGM2018 11/1/2019 15.96 80.72 57,367.05079616 Design CD4-594PH1 Audit Notes: Version: 1.0 Phase: Vertical Section: Depth From (TVD) (usft) 27.4 Survey Program Date 12/23/2019 From To (usft) (usft) Survey (Wellbore) 109.9 1,008.1 CD4-594PH1 Srvy 1 - SDI M/GWD Surve 1,078.4 1,311.0 CD4-594PH1 Srvy 2 - SLB_DUAL+GMAG 1,341.0 1,491.0 CD4-594PH1 Srvy 3-SLB_MWD+SAG ( 1,521.0 2,740.9 CD4-594PH1 Srvy 4 - SLB_DUAL+GMAG 2,837.9 2,837.9 CD4-594PH1 Srvy 5 - SLB_MWD_Inc On 2,921.1 10,203.7 CD4-594PH1 Srvy 6 - SLB_DUAL+GMAG 10,303.3 14,662.0 CD4-594PH1 Snry 7 - SLB_DUAL+GMAG Survey ACTUAL Tie On Di +N/S +El-W (usft) (usft) 0.0 0.0 Tool Name Description Survey Date GYD-GC-MS Gyrodata gyrocompassing m/s 10/3/2019 4:18: MWD+IFR2+HDS+MS OWSG MWD + IFR2 + HDS + Multi -Station Correcl0/3/2019 4:24: MWD OWSG OWSG MWD - Standard 10/4/2019 4:28: MWD+IFR2+HDS+MS OWSG MWD + IFR2 + HDS + Multi -Station Correc10/4/2019 4:30: MWD-INC_ONLY (INC>10°) MWD-INC_ONLY_FILLER ( INC>10°) 10/11/2019 2:25 MWD+IFR2+HDS+MS OWSG MWD + IFR2 + HDS + Multi -Station Correc10/11/2019 2:27 MWD+IFR2+HDS+MS OWSG MWD + IFR2 + HDS + Multi -Station Correcl0/30/2019 2:27 Map Map Vertical MD Inc Azi TVD TVDSS +N/-S +E/-W Northing Easting DLS Section (usft) (°) (1 (usft) (usft) (usft) (usft) (ft) (ft) (°/100') (ft) Survey Tool Name 27.4 0.00 0.00 27.4 -19.0 0.0 0.0 5,957,553.5 378,291.3 0.0 0.00 UNDEFINED 109.9 0.30 256.26 109.9 63.5 -0.1 -0.2 5,957,553.4 378,291.1 0.4 -0.19 GYD-GC-MS (1) 135.6 0.33 167.50 135.5 89.1 -0.1 -0.3 5,957,553.4 378,291.1 1.7 -0.22 GYD-GC-MS (1) 168.3 0.30 69.50 168.3 121.9 -0.2 -0.2 5,957,553.3 378,291.2 1.5 -0.11 GYD-GC-MS (1) 201.4 0.43 129.92 201.4 155.0 -0.3 0.0 5,957,553.2 378,291.3 1.2 0.08 GYD-GC-MS (1) 258.1 0.77 88.64 258.1 211.7 -0.4 0.6 5,957,553.1 378,291.9 0.9 0.63 GYD-GC-MS (1) 350.7 2.60 103.07 350.7 304.3 -0.8 3.2 5,957,552.6 378,294.5 2.0 3.34 GYD-GC-MS (1) 443.4 3.46 102.75 443.2 396.8 -1.9 8.0 5,957,551.4 378,299.3 0.9 8.23 GYD-GC-MS (1) 535.0 4.96 102.79 534.6 488.2 -3.4 14.6 5,957,549.8 378,305.8 1.6 14.96 GYD-GC-MS (1) 1212312019 12:11.38PM Page 2 COMPASS 5000.14 Build 85H ConocoPhillips Definitive Survey Report Company: NADConversion Local Co-ordinate Reference: Well CD4-594 Project: North Alaska ASP4 TVD Reference: CD4-594 Actual @ 46.4usft Site: CD4 Nanuq Pad MD Reference: CD4-594 Actual @ 46.4usft Well: CD4-594 North Reference: True Wellbore: CD4-594PH1 Survey Calculation Method: Minimum Curvature Design: CD4-594PH1 Database: EDT 14 Alaska Production Survey Map Map Vertical MD Inc Azi TVD TVDSS +N/-S +E/-W Northing Easting DLS Section (usft) (°) (°) (usft) (usft) (usft) (usft) (ft) (ft) (°/100-) (ft) Survey Tool Name 627.0 5.51 107.69 626.2 579.8 -5.6 22.6 5,957,547.5 378,313.9 0.8 23.34 GYD-GC-MS (1) 716.0 6.52 108.07 714.7 668.3 -8.5 31.5 5,957,544.5 378,322.7 1.1 32.64 GYD-GC-MS (1) 811.9 8.99 101.42 809.7 763.3 -11.7 44.0 5,957,541.1 378,335.2 2.7 45.56 GYD-GC-MS (1) 908.4 12.75 100.17 904.5 858.1 -15.1 61.9 5,957,537.4 378,353.0 3.9 63.73 GYD-GC-MS (1) 1,008.1 15.95 97.66 1,001.0 954.6 -18.8 86.3 5,957,533.3 378,377.3 3.3 88.34 GYD-GC-MS(1) 1,078.4 16.21 96.37 1,068.6 1,022.2 -21.2 105.7 5,957,530.6 378,396.6 0.6 107.68 MWD+IFR2+HDS+MS (2) 1,101.0 16.68 96.79 1,090.3 1,043.9 -21.9 112.0 5,957,529.7 378,403.0 2.1 114.04 MWD+IFR2+HDS+MS (2) 1,131.0 17.70 97.52 1,118.9 1,072.5 -23.0 120.8 5,957,528.5 378,411.7 3.5 122.85 MWD+IFR2+HDS+MS (2) 1,161.0 18.26 97.66 1,147.5 1,101.1 -24.3 130.0 5,957,527.1 378,420.9 1.9 132.06 MWD+IFR2+HDS+MS(2) 1,191.0 18.84 98.23 1,175.9 1,129.5 -25.6 139.4 5,957,525.7 378,430+3 2.0 141.56 MWD+IFR2+HDS+MS (2) 1,221.0 19.42 99.07 1,204.2 1,157.8 -27.1 149.2 5,957,524.0 378,440.0 2.1 151.36 MWD+IFR2+HDS+MS (2) 1,251.0 19.81 100.47 1,232.5 1,186.1 -28.8 159.1 5,957,522.1 378,449.9 2.0 161.41 MWD+IFR2+HDS+MS (2) 1,281.0 20.38 102.32 1,260.7 1,214.3 -30.8 169.2 5,957,519.9 378,460.0 2.8 171.71 MWD+IFR2+HDS+MS (2) 1,311.0 21.09 103.95 1,288.7 1,242.3 -33.2 179.5 5,957,517.4 378,470.3 3.0 182.33 MWD+IFR2+HDS+MS (2) 1,341.0 22.06 104.99 1,316.6 1,270.2 -36.0 190.2 5,957,514.4 378,480.9 3.5 193.36 MWD OWSG (3) 1,371.0 23.14 105.63 1,344.3 1,297.9 -39.0 201.3 5,957,511.2 378,492.0 3.7 204.88 MWD OWSG (3) 1,401.0 24.40 106.28 1,371.8 1,325.4 -42.4 213.0 5,957,507.7 378,503.6 4.3 216.96 MWD OWSG (3) 1,431.0 25.62 106.78 1,399.0 1,352.6 -46.0 225.1 5,957,503.9 378,515.7 4.1 229.63 MWD OWSG (3) 1,461.0 26.39 107.00 1,425.9 1,379.5 A9.8 237.7 5,957,499.9 378,528.2 2.6 242.76 MWD OWSG (3) 1,491.0 27.93 107.23 1,452.6 1,406.2 -53.8 250.8 5,957,495.6 378,541.2 5.1 256.42 MWD OWSG (3) 1,521.0 29.39 107.23 1,479.0 1,432.6 -58.1 264.5 5,957,491.1 378,554.9 4.9 270.78 MWD+IFR2+HDS+MS (4) 1,551.0 30.76 106.76 1,504.9 1,458.5 -62.5 278.9 5,957,486.5 378,569.2 4.6 285.79 MWD+IFR2+HDS+MS (4) 1,581.0 32.14 106.29 1,530.5 1,484.1 -66.9 293.9 5,957,481+8 378,584.1 4.7 301.42 MWD+IFR2+HDS+MS (4) 1,611.0 33.05 105.83 1,555.8 1,509.4 -71.4 309.4 5,957,477.1 378,599.6 3.1 317.56 MWD+IFR2+HDS+MS (4) 1,641.0 33.89 105.37 1,580.8 1,534.4 -75.8 325.4 5,957,472.4 378,615.4 2.9 334.09 MWD+IFR2+HDS+MS (4) 1,671.0 34.67 104.91 1,605.6 1,559.2 -80.3 341.7 5,957,467.7 378,631.6 2.7 350.98 MWD+IFR2+HDS+MS (4) 1,701.0 35.19 104.47 1,630.2 1,583.8 -84.6 358.3 5,957,463.1 378,648.2 1.9 368.16 MWD+IFR2+HDS+MS (4) 1,731.0 35.73 104.27 1,654.6 1,608.2 -88.9 375.2 5,957,458.5 378,665.0 1.8 385.56 MWD+IFR2+HDS+MS (4) 1,761.0 36.28 104.15 1,678.9 1,632.5 -93.3 392.3 5,957,453.9 378,682.0 1.8 403.19 MWD+IFR2+HDS+MS (4) 1,791.0 36.44 104.02 1,703.1 1,656.7 -97.6 409.5 5,957,449.3 378,699.2 0.6 420.98 MWD+IFR2+HDS+MS (4) 1,821.0 37.04 103.57 1,727.1 1,680.7 -101.9 426.9 5,957,444.7 378,716.5 2.2 438.92 MWD+IFR2+HDS+MS (4) 1,851.0 37.87 102.96 1,750.9 1,704.5 -106.0 444.7 5,957,440.3 378,734.2 3.0 457.17 MWD+IFR2+HDS+MS (4) 1,881.0 39.02 102.34 1,774.4 1,728.0 -110.1 462.9 5,957,435.9 378,752.3 4.0 475.82 MWD+IFR2+HDS+MS (4) 1,911.0 40.15 101.87 1,797.5 1,751.1 -114.1 481.6 5,957,431.6 378,771.0 3.9 494.93 MWD+IFR2+HDS+MS (4) 1,941.0 40.85 101.52 1,820.3 1,773.9 -118.1 500.7 5,957,427.3 378,790.0 2.5 514.40 MWD+IFR2+HDS+MS (4) 1,971.0 41.33 101.18 1,842.9 1,796.5 -122.0 520.0 5,957,423.1 378,809.2 1.8 534.10 MWD+IFR2+HDS+MS (4) 2,001.0 41.66 101.16 1,865.4 1,819.0 -125.8 539.5 5,957,419.0 378,828.7 1.1 553.97 MWD+IFR2+HDS+MS (4) 2,031.0 41.52 101.75 1,887.9 1,841.5 -129.8 559.0 5,957,414.7 378,848.1 1.4 573.87 MWD+IFR2+HDS+MS (4) 2,061.0 41.72 102.34 1,910.3 1,863.9 -133.9 578.5 5,957,410.2 378,867.5 1.5 593.79 MWD+IFR2+HDS+MS (4) 2,091.0 42.70 102.88 1,932.5 1,886.1 -138.3 598.2 5,957,405.5 378,887.1 3.5 613.94 MWD+IFR2+HDS+MS (4) 1212312019 12.11:38PM Page 3 COMPASS 5000.14 Build 85H ConocoPhillips Definitive Survey Report Company: NADConversion Local Co-ordinate Reference: Well CD4-594 Project: North Alaska ASP4 TVD Reference: CD4-594 Actual @ 46.4usft Site: CD4 Nanuq Pad MD Reference: CD4-594 Actual @ 46.4usft Well: CD4-594 North Reference: True Wellbore: CD4-594PH1 Survey Calculation Method: Minimum Curvature Design: CD4-594PH1 Database: EDT 14 Alaska Production Survey Map Map Vertical MD Inc Azi TVD TVDSS +N/-S +EI-W Northing Easting DLS Section (usft) (°) (°) (usft) (usft) (usft) (usft) (ft) (ft) (°/100') (ft) Survey Tool Name 2,121.0 43.89 103.28 1,954.3 1,907.9 -143.0 618.2 5,957,400.5 378,907.1 4.1 634.51 MWD+IFR2+HDS+MS (4) 2,151.0 44.77 103.66 1,975.8 1,929+4 -147.9 638.6 5,957,395.3 378,927.4 3.1 655.47 MWD+IFR2+HDS+MS (4) 2,181.0 45.47 103.95 1,997.0 1,950.6 -152.9 659.2 5,957,389.9 378,948.0 2.4 676.73 MWD+IFR2+HDS+MS (4) 2,211.0 46.62 103.62 2,017.8 1,971.4 -158.1 680.2 5,957,384.4 378,968.8 3.9 698.33 MWD+IFR2+HDS+MS (4) 2,241.0 47.52 103.21 2,038.2 1,991.8 -163.2 701.6 5,957,379.0 378,990.1 3.2 720.29 MWD+IFR2+HDS+MS (4) 2,271.0 48.66 102.81 2,058.3 2,011.9 -168.2 723.3 5,957,373.6 379,011.8 3.9 742.62 MWD+IFR2+HDS+MS (4) 2,301.0 49.60 102.46 2,077.9 2,031.5 -173.2 745.5 5,957,368.3 379,033.8 3.3 765.30 MWD+IFR2+HDS+MS (4) 2,331.0 50.29 102.12 2,097.2 2,050.8 -178.1 767.9 5,957,363.0 379,056.2 2.5 788.26 MWD+IFR2+HDS+MS (4) 2,361.0 50.97 101.79 2,116.2 2,069.8 -182.9 790.6 5,957,357.9 379,078.8 2.4 811.44 MWD+IFR2+HDS+MS (4) 2,391.0 51.67 101.85 2,135.0 2,088.6 -187.7 813.5 5,957,352.7 379,101.6 2.3 834.85 MWD+IFR2+HDS+MS (4) 2,421.0 52.30 102.10 2,153.4 2,107.0 -192.6 836.6 5,957,347.4 379,124.7 2.2 858.48 MWD+IFR2+HDS+MS (4) 2,451.0 52.95 102.34 2,171.7 2,125.3 -197.6 859.9 5,957,342.0 379,147.9 2.3 882.31 MWD+IFR2+HDS+MS (4) 2,481.0 53.71 102.33 2,189.6 2,143.2 -202.8 883.4 5,957,336.5 379,171.3 2.5 906.37 MWD+IFR2+HDS+MS (4) 2,511.0 54.84 102.09 2,207.1 2,160.7 -207.9 907.2 5,957,330.9 379,195.0 3.8 930.72 MWD+IFR2+HDS+MS (4) 2,541.0 56.10 101.86 2,224.1 2,177.7 -213.0 931.4 5,957,325.4 379,219.1 4.2 955.42 MWD+IFR2+HDS+MS (4) 2,571.0 57.17 101.77 2,240.6 2,194.2 -218.2 955.9 5,957,319.9 379,243.5 3.6 980.47 MWD+IFR2+HDS+MS (4) 2,601.0 57.74 101.89 2,256.7 2,210.3 -223.3 980.7 5,957,314.3 379,268.2 1.9 1,005.74 MWD+IFR2+HDS+MS (4) 2,631.0 58.30 102.01 2,272.6 2,226.2 -228.6 1,005.6 5,957,308.6 379,293.0 1.9 1,031.18 MWD+IFR2+HDS+MS (4) 2,661.0 58.93 102.19 2,288.2 2,241.8 -234.0 1,030.6 5,957,302.9 379,318.0 2.2 1,056.78 MWD+IFR2+HDS+MS (4) 2,691.0 59.81 102.50 2,303.5 2,257.1 -239.5 1,055.9 5,957,296.9 379,3411 3.1 1,082.59 MWD+IFR2+HDS+MS (4) 2,721.0 60.47 102.82 2,318.5 2,272.1 -245.2 1,081.2 5,957,290.8 379,368.4 2.4 1,108.61 MWD+IFR2+HDS+MS (4) 2,740.9 60.63 103.04 2,328.3 2,281.9 -249.1 1,098.2 5,957,286.7 379,385.2 1.3 1,125.97 MWD+IFR2+HDS+MS (4) 2,835.0 61.53 103.49 2,373.8 2,327.4 -268.0 1,178.3 5,957,266.5 379,465.0 1.0 1,208.30 NOT an ActualSuroey 13 318 x 16 2,837.9 61.56 103.50 2,375.1 2,328.7 -268.6 1,180.7 5,957,265.9 379,467.5 1.0 1,210.81 MWD-INC_ONLY (INC>10°)(5) 2,921.1 63.47 105.09 2,413.5 2,367A -286.8 1,252.3 5,957,246.5 379,538.7 2.9 1,284.63 MWD+IFR2+HDS+MS (6) 2,951.0 64.46 105.48 2,426.7 2,380.3 -293.9 1,278.2 5,957,239.0 379,564.5 3.5 1,311.50 MWD+IFR2+HDS+MS (6) 2,981.0 65.47 105.87 2,439.4 2,393.0 -301.2 1,304.4 5,957,231.2 379,590.6 3.6 1,338.66 MWD+IFR2+HDS+MS (6) 3,011.0 66.35 106.27 2,451.6 2,405.2 -308.8 1,330.7 5,957,223.2 379,616.7 3.2 1,366.02 MWD+IFR2+HDS+MS (6) 3,041.0 67.36 106.93 2,463.4 2,417.0 -316.7 1,357A 5,957,214.9 379,643.0 3.9 1,393.56 MWD+IFR2+HDS+MS (6) 3,071.0 68.34 107.66 2,474.7 2,428.3 -325.0 1,383.7 5,957,206.2 379,669.4 4.0 1,421.29 MWD+IFR2+HDS+MS (6) 3,101.0 69.20 108.40 2,485.6 2,439.2 -333.6 1,410.2 5,957,197.1 379,695.9 3.7 1,449.16 MWD+IFR2+HDS+MS (6) 3,131.0 69.90 109.06 2,496.0 2,449.6 -342.6 1,436.9 5,957,187.7 379,722.3 3.1 1,477.16 MWD+IFR2+HDS+MS (6) 3,161.0 70.69 109.69 2,506.2 2,459.8 -352.0 1,463.5 5,957,177.9 379,748.8 3.3 1,505.25 MWD+IFR2+HDS+MS (6) 3,191.0 71.73 110.32 2,515.8 2,469.4 -361.7 1,490.2 5,957,167.7 379,775.4 4.0 1,533.47 MWD+IFR2+HDS+MS (6) 3,221.0 72.97 110.92 2,524.9 2,478.5 -371.8 1,517.0 5,957,157.2 379,801.9 4.6 1,561.83 MWD+IFR2+HDS+MS (6) 3,251.0 73.99 111.48 2,533.4 2,487.0 -382.2 1,543.8 5,957,146.4 379,828.6 3.8 1,590.33 MWD+IFR2+HDS+MS (6) 3,281.0 74.96 112.05 2,541.5 2,495.1 -392.9 1,570.6 5,957,135.2 379,855.2 3.7 1,618.94 MWD+IFR2+HDS+MS (6) 3,311.0 76.01 112.59 2,549.0 2,502.6 -403.9 1,597.5 5,957,123.8 379,881.9 3.9 1,647.64 MWD+IFR2+HDS+MS (6) 3,341.0 77.02 113.06 2,556.0 2,509.6 -415.3 1,624.4 5,957,112.0 379,908.6 3.7 1,676.42 MWD+IFR2+HDS+MS (6) 1223/2019 12.11.38PM Page 4 COMPASS 5000.14 Build 85H ConocoPhillips Definitive Survey Report Company: NADConversion Local Coordinate Reference: Well CD4-594 Project: North Alaska ASP4 TVD Reference: CD4-594 Actual @ 46.4usft Site: CD4 Nanuq Pad MD Reference: CD4-594 Actual @ 46.4usft Well: CD4-594 North Reference: True Wellbore: CD4-594PH1 Survey Calculation Method: Minimum Curvature Design: CD4-594PH1 Database: EDT 14 Alaska Production Survey Map Map Vertical MD Inc Azi TVD TVDSS +N/-S +E/-W Northing Easting DLS Section (usft) (°) (°) (usft) (usft) (usft) (usft) (g) (ft) (°/100-) (ft) Survey Tool Name 3,371.0 77.73 113.54 2,562.6 2,516.2 -426.8 1,651.3 5,957,100.0 379,935.3 2.8 1,705.27 MWD+IFR2+HDS+MS (6) 3,401.0 78.30 114.07 2,568.8 2,522.4 -438.7 1,678.1 5,957,087.7 379,962.0 2.6 1,734.14 MWD+IFR2+HDS+MS (6) 3,431.0 78.50 114.80 2,574.8 2,528.4 -450.8 1,704.9 5,957,075.1 379,988.5 2.5 1,763.00 MWD+IFR2+HDS+MS (6) 3,461.0 78.82 115.55 2,580.7 2,534.3 -463.4 1,731.5 5,957,062.2 380,014.9 2.7 1,791.80 MWD+IFR2+HDS+MS (6) 3,491.0 79.24 116.31 2,586.4 2,540.0 -476.2 1,758.0 5,957,048.9 380,041.2 2.9 1,820.56 MWD+IFR2+HDS+MS (6) 3,521.0 79.55 117.12 2,591.9 2,545.5 -489.5 1,784.3 5,957,035.2 380,067.3 2.8 1,849.27 MWD+IFR2+HDS+MS (6) 3,551.0 79.74 117.94 2,597.3 2,550.9 -503.1 1,810.5 5,957,021.2 380,093.3 2.8 1,877.90 MWD+IFR2+HDS+MS (6) 3,581.0 79.84 118.76 2,602.7 2,556.3 -517.1 1,836.5 5,957,006.7 380,119.0 2.7 1,906.44 MWD+IFR2+HDS+MS (6) 3,611.0 80.04 119.65 2,607.9 2,561.5 -531.6 1,862.2 5,956,991.9 380,144.6 3.0 1,934.87 MWD+IFR2+HDS+MS (6) 3,641.0 80.49 120.55 2,613.0 2,566.6 -546.4 1,887.8 5,956,976.7 380,169.9 3.3 1,963+21 MWD+IFR2+HDS+MS (6) 3,671.0 81.06 121.45 2,617.8 2,571.4 -561.6 1,913.2 5,956,961.0 380,195.0 3.5 1,991.45 MWD+IFR2+HDS+MS (6) 3,701.0 81.72 122.17 2,622.3 2,575.9 -577.3 1,938.4 5,956,945.0 380,220.0 3.2 2,019.61 MWD+IFR2+HDS+MS (6) 3,731.0 82.08 122.78 2,626.5 2,580.1 -593.2 1,963.5 5,956,928.6 380,244.8 2.3 2,047.69 MWD+IFR2+HDS+MS (6) 3,761.0 82.58 123.38 2,630.5 2,584.1 -609.5 1,988.4 5,956,912.0 380,269.4 2.6 2,075.70 MWD+IFR2+HDS+MS (6) 3,791.0 82.85 123.60 2,634.3 2,587.9 -625.9 2,013.2 5,956,895.2 380,294.0 1.2 2,103.67 MWD+IFR2+HDS+MS (6) 3,821.0 82.95 123.60 2,638.0 2,591.6 -642.3 2,038.0 5,956,878.3 380,318.5 0.3 2,131.62 MWD+IFR2+HDS+MS (6) 3,851.0 82.92 123.60 2,641.7 2,595.3 -658.8 2,062.8 5,956,861.4 380,343.0 0.1 2,1%58 MWD+IFR2+HDS+MS (6) 3,881.0 82.97 123.49 2,645.4 2,599.0 -675.3 2,087.6 5,956,844.6 380,367.6 0.4 2,187.55 MWD+IFR2+HDS+MS (6) 3,911.0 82.99 123.25 2,649.1 2,602.7 -691.7 2,112.5 5,956,827.8 380,392.1 0.8 2,215.55 MWD+IFR2+HDS+MS (6) 3,941.0 83.06 123.02 2,652.7 2,606.3 -707.9 2,137.4 5,956,811.1 380,416.8 0.8 2,243.60 MWD+IFR2+HDS+MS (6) 3,971.0 83.08 122.90 2,656.3 2,609.9 -724.1 2,162.4 5,956,794.5 380,441.5 0.4 2,271.68 MWD+IFR2+HDS+MS (6) 4,001.0 83.06 123.02 2,659.9 2,613.5 -740.3 2,187.4 5,956,777.9 380,466.3 0.4 2,299.76 MWD+IFR2+HDS+MS (6) 4,031.0 83.05 123.14 2,663.6 2,617.2 -756.6 2,212.3 5,956,761.2 380,490.9 0.4 2,327.81 MWD+IFR2+HDS+MS (6) 4,061.0 83.08 123.16 2,667.2 2,620.8 -772.9 2,237.3 5,956,744.6 380,515.6 0.1 2,355.86 MWD+IFR2+HDS+MS (6) 4,091.0 83.01 122.83 2,670.8 2,624.4 -789.1 2,262.2 5,956,727.9 380,540.3 1.1 2,383.93 MWD+IFR2+HDS+MS (6) 4,121.0 83.08 122.47 2,674.4 2,628.0 -805.2 2,287.3 5,956,711.5 380,565.1 1.2 2,412.06 MWD+IFR2+HDS+MS (6) 4,151.0 83.23 122.15 2,678.0 2,631.6 -821.1 2,312.5 5,956,695.1 380,590.0 1.2 2,440.26 MWD+IFR2+HDS+MS (6) 4,181.0 83.18 122.06 2,681.6 2,635.2 -836.9 2,337.7 5,956,678.9 380,615.0 0.3 2,468.49 MWD+IFR2+HDS+MS (6) 4,211.0 83.09 122.00 2,685.2 2,638.8 -852.7 2,363.0 5,956,662.7 380,640.0 0A 2,496.73 MWD+IFR2+HDS+MS (6) 4,241.0 83.09 121.94 2,688.8 2,642.4 -868.5 2,388.2 5,956,646.5 380,665.0 0.2 2,524.98 MWD+IFR2+HDS+MS (6) 4,271.0 83.08 121.89 2,692.4 2,646.0 -884.2 2,413.5 5,956,630.4 380,690.0 0.2 2,553.23 MWD+IFR2+HDS+MS (6) 4,301.0 83.13 121.84 2,696.0 2,649.6 -899.9 2,438.8 5,956,614.3 380,715.1 0.2 2,581.50 MWD+IFR2+HDS+MS (6) 4,331.0 83.17 121.78 2,699.6 2,653.2 -915.6 2,464.1 5,956,598.1 380,740.1 0.2 2,609.78 MWD+IFR2+HDS+MS (6) 4,361.0 83.07 121.63 2,703.2 2,656.8 -931.3 2,489.5 5,956,582.1 380,765.2 0.6 2,638.07 MWD+IFR2+HDS+MS (6) 4,391.0 83.16 121.43 2,706.8 2,660.4 -946.9 2,514.9 5,956,566.1 380,790.3 0.7 2,666.39 MWD+IFR2+HDS+MS (6) 4,421.0 83.23 121.23 2,710.3 2,663.9 -962.4 2,540.3 5,956,550.2 380,815.5 0.7 2,694.75 MWD+IFR2+HDS+MS (6) 4,451.0 83.24 121.05 2,713.8 2,667.4 -977.8 2,565.8 5,956,534.4 380,840.7 0.6 2,723.14 MWD+IFR2+HDS+MS (6) 4,481.0 83.22 120.88 2,717.4 2,671.0 -993.1 2,591.3 5,956,518.7 380,866.0 0.6 2,751.55 MWD+IFR2+HDS+MS (6) 4,511.0 83.32 120.71 2,720.9 2,674.5 -1,008.3 2,616.9 5,956,503.0 380,891.4 0.7 2,780.00 MWD+IFR2+HDS+MS (6) 4,541.0 83.27 120.64 2,724.4 2,678.0 -1,023.5 2,642.6 5,956,487.4 380,916.8 0.3 2,808.46 MWD+IFR2+HDS+MS (6) 12/23/2019 12.11:38PM Page 5 COMPASS 5000.14 Build 85H ConocoPhillips Definitive Survey Report Company: NADConversion Local Co-ordinate Reference: Well CD4-594 Project: North Alaska ASP4 TVD Reference: CD4-594 Actual @ 46.4usft Site: CD4 Nanuq Pad MD Reference: CD4-594 Actual @ 46.4usft Well: CD4-594 North Reference: True Wellbore: CD4-594PH1 Survey Calculation Method: Minimum Curvature Design: CD4-594PH1 Database: EDT 14 Alaska Production Survey Map Map Vertical MD Inc Azi TVD TVDSS +N/-S +E/-W Northing Easting DLS Section (usft) (°) (°) (usft) (usft) (usft) (usft) (ft) (ft) (°/100-) (ft) Survey Tool Name 4,571.0 83.17 120.67 2,727.9 2,681.5 -1,038.7 2,668.2 5,956,471.8 380,942.1 0.3 2,836.93 MWD+IFR2+HDS+MS (6) 4,601.0 83.30 120.70 2,731.5 2,685.1 -1,053.9 2,693.8 5,956,456.2 380,967.5 0.4 2,865.39 MWD+IFR2+HDS+MS (6) 4,631.0 83.17 120.71 2,735.0 2,688.6 -1,069.2 2,719.4 5,956,440.5 380,992.9 0.4 2,893.85 MWD+IFR2+HDS+MS (6) 4,661.0 83.04 120.67 2,738.6 2,692.2 -1,084.4 2,745+0 5,956,424.9 381,018.2 0.5 2,922.30 MWD+IFR2+HDS+MS (6) 4,691.0 83.15 120.63 2,742.2 2,695.8 -1,099.5 2,770.7 5,956,409.3 381,043.6 0.4 2,950.76 MWD+IFR2+HDS+MS (6) 4,721.0 83.09 120.63 2,745.8 2,699+4 -1,114.7 2,796.3 5,956,393.7 381,069.0 0.2 2,979.22 MWD+IFR2+HDS+MS (6) 4,751.0 82.96 120.75 2,749.4 2,703.0 -1,129.9 2,821.9 5,956,378+1 381,094.3 0.6 3,007.67 MWD+IFR2+HDS+MS (6) 4,781.0 83.06 120.88 2,753.1 2,706.7 -1,145.2 2,847.5 5,956,362.5 381,119.6 0.5 3,036.09 MWD+IFR2+HDS+MS (6) 4,811.0 83.05 120.99 2,756.7 2,710.3 -1,160.5 2,873.0 5,956,346.8 381,144.9 0.4 3,064.50 MWD+IFR2+HDS+MS (6) 4,841.0 82.97 120.98 2,760.4 2,714.0 -1,175.8 2,898.5 5,956,331+0 381,170.2 0.3 3,092.90 MWD+IFR2+HDS+MS (6) 4,871.0 83.09 120.96 2,764.0 2,717.6 -1,191.1 2,924.1 5,956,315.3 381,195.5 0.4 3,121.31 MWD+IFR2+HDS+MS (6) 4,901.0 83.13 120.95 2,767.6 2,721.2 -1,206.4 2,949.6 5,956,299.6 381,220.8 0.1 3,149.72 MWD+IFR2+HDS+MS (6) 4,931.0 83.07 121.03 2,771.2 2,724.8 -1,221.8 2,975.1 5,956,283.8 381,246.1 0.3 3,178.12 MWD+IFR2+HDS+MS (6) 4,961.0 83.12 121.15 2,774.8 2,728.4 -1,237.2 3,000.6 5,956,268.0 381,271.3 0.4 3,206.51 MWD+IFR2+HDS+MS (6) 4,991.0 83.10 121.27 2,778.4 2,732.0 -1,252.6 3,026.1 5,956,252.2 381,296.5 0.4 3,234.89 MWD+IFR2+HDS+MS (6) 5,021.0 82.97 121.40 2,782.1 2,735.7 -1,268.1 3,051.6 5,956,236.3 381,321.7 0.6 3,263.23 MWD+IFR2+HDS+MS (6) 5,051.0 82.91 121.53 2,785.8 2,739.4 -1,283.6 3,076.9 5,956,220.3 381,346.8 0.5 3,291.55 MWD+IFR2+HDS+MS (6) 5,081.0 82.96 121.67 2,789.4 2,743.0 -1,299.2 3,102.3 5,956,204.3 381,371.9 0.5 3,319.85 MWD+IFR2+HDS+MS (6) 5,111.0 82.92 121.81 2,793.1 2,746.7 -1,314.9 3,127.6 5,956,188.3 381,397.0 0.5 3,348.13 MWD+IFR2+HDS+MS (6) 5,141.0 82.98 121.96 2,796.8 2,750.4 -1,330.6 3,152.9 5,956,172.1 381,422.0 0.5 3,376.38 MWD+IFR2+HDS+MS (6) 5,171.0 83.06 122.10 2,800.5 2,754.1 -1,346.4 3,178.1 5.956,155.9 381,447.0 0.5 3,404.61 MWD+IFR2+HDS+MS (6) 5,201.0 83.05 122.19 2,804.1 2,757.7 -1,362.2 3,203.4 5,956,139.7 381,472.0 0.3 3,432.83 MWD+IFR2+HDS+MS (6) 5,231.0 83.07 122.17 2,807.7 2,761.3 -1,378.1 3,228.6 5,956,123.4 381,496.9 0.1 3,461.04 MWD+IFR2+HDS+MS (6) 5,261.0 83.11 122.14 2,811.3 2,764.9 -1,394.0 3,253.8 5,956,107.2 381,521.8 0.2 3,489.26 MWD+IFR2+HDS+MS (6) 5,291.0 83.04 122.17 2,814.9 2,768.5 -1,409.8 3,279.0 5,956,090.9 381,546.8 0.3 3,517.47 MWD+IFR2+HDS+MS (6) 5,321.0 83.07 122.34 2,818.6 2,772.2 -1,425.7 3,304.2 5,956,074.6 381,571.7 0.6 3,545.67 MWD+IFR2+HDS+MS (6) 5,351.0 83.18 122.51 2,822.2 2,775.8 -1,441.7 3,329.3 5,956,058.2 381,596.6 0.7 3,573.85 MWD+IFR2+HDS+MS (6) 5,381.0 83.32 122.64 2,825.7 2,779.3 -1,457.7 3,354.4 5,956,041.8 381,621.4 0.6 3,602.00 MWD+IFR2+HDS+MS (6) 5,411.0 83.22 122.56 2,829.2 2,782.8 -1,473.8 3,379.5 5,956,025.3 381,646.3 0.4 3,630.15 MWD+IFR2+HDS+MS (6) 5,441.0 82.92 122.44 2,832.8 2,786.4 -1,489.8 3,404.6 5,956,008.9 381,671.1 1.1 3,658.31 MWD+IFR2+HDS+MS (6) 5,471.0 83.00 122.34 2,836.5 2,790.1 -1,505.7 3,429.8 5,955,992.6 381,696.0 0.4 3,686.48 MWD+IFR2+HDS+MS (6) 5,501.0 83.13 122.33 2,840.1 2,793.7 -1,521.6 3,454.9 5,955,976.2 381,720.9 0.4 3,714.67 MWD+IFR2+HDS+MS (6) 5,531.0 83.14 122.35 2,843.7 2,797.3 -1,537.6 3,480.1 5,955,959.9 381,745.8 0.1 3,742.85 MWD+IFR2+HDS+MS (6) 5,561.0 83.19 122.37 2,847.3 2,800.9 -1,553.5 3,505.3 5,955,943.6 381,770.7 0.2 3,771.04 MWD+IFR2+HDS+MS (6) 5,591.0 83.33 122.23 2,850.8 2,804.4 -1,569.4 3,530.5 5,955,927.2 381,795.6 0.7 3,799.24 MWD+IFR2+HDS+MS (6) 5,621.0 83.25 122.02 2,854.3 2,807.9 -1,585.3 3,555.7 5,955,911.0 381,820.6 0.7 3,827.48 MWD+IFR2+HDS+MS (6) 5,651.0 83.23 121.81 2,857.8 2,811.4 -1,601.0 3,581.0 5,955,894.8 381,845.6 0.7 3,855.74 MWD+IFR2+HDS+MS (6) 5,681.0 83.18 121.76 2,861.4 2,815.0 -1,616.7 3,606.3 5,955,878.7 381,870.7 0.2 3,884.03 MWD+IFR2+HDS+MS (6) 5,711.0 83.30 121.82 2,864.9 2,818.5 -1,632.4 3,631.6 5,955,862.6 381,895.7 0.4 3,912.31 MWD+IFR2+HDS+MS (6) 5,741.0 83.28 121.88 2,868.4 2,822.0 -1,648.1 3,656.9 5,955,846.5 381,920.8 0.2 3,940.59 MWD+IFR2+HDS+MS (6) 1212312019 12:11:38PM Page 6 COMPASS 5000.14 Build 85H ConocoPhillips Definitive Survey Report Company: Project: Site: Well: Weilbore: Design: Survey NADConversion Local Co-ordinate Reference: Well CD4-594 North Alaska ASP4 TVD Reference: CD4-594 Actual @ 46.4usft CD4 Nanuq Pad MD Reference: CD4-594 Actual @ 46.4usft CD4-594 North Reference: True CD4-594PH1 Survey Calculation Method: Minimum Curvature CD4-594PH1 Database: EDT 14 Alaska Production MD Inc (usft) (°) 5,771.0 83.38 5,801.0 83.26 5,831.0 83.22 5,861.0 83.23 5,891.0 83.30 5,921.0 83.26 5,951.0 83.02 5,981.0 83.07 6,011.0 83.20 6,041.0 83.16 6,071.0 83.10 6,101.0 83.16 6,131.0 83.22 6,161.0 82.90 6,191.0 83.07 6,221.0 83.22 6,251.0 83.18 6,281.0 83.11 6,311.0 82.95 6,341.0 83.03 6,371.0 83.14 6,401.0 83.19 6,431.0 83.18 6,461.0 82.99 6,491.0 82.92 6,521.0 82.53 6,551.0 82.41 6,581.0 82.72 6,611.0 82.76 6,641.0 82.65 6,671.0 82.78 6,701.0 82.84 6,731.0 82.95 6,761.0 82.82 6,791.0 82.83 6,821.0 82.87 6,851.0 82.94 6,881.0 83.00 6,911.0 82.99 6,941.0 82.87 Map Map Vertical Azi TVD TVDSS +N/-S +El-W Northing Easting DLS Section (°) (usft) (usft) (usft) (usft) (ft) (ft) (°/700') (ft) Survey Tool Name 121.88 2,871.9 2,825.5 -1,663.9 3,682.2 5,955,830.4 381,945.8 0.3 3,968.87 MWD+IFR2+HDS+MS (6) 121.80 2,875.4 2,829.0 -1,679.6 3,707.5 5,955,814.2 381,970.9 0.5 3,997.15 MWD+IFR2+HDS+MS (6) 121.71 2,878.9 2,832.5 -1,695.3 3,732.9 5,955,798.1 381,996.0 0.3 4,025.44 MWD+IFR2+HDS+MS (6) 121.64 2,882.5 2,836.1 -1,710.9 3,758.2 5,955,782.1 382,021.1 0.2 4,053.75 MWD+IFR2+HDS+MS (6) 121.59 2,886.0 2,839.6 -1,726.5 3,783.6 5,955,766.1 382,046.2 0.3 4,082.06 MWD+IFR2+HDS+MS (6) 121.54 2,889.5 2,843.1 -1,742.1 3,809.0 5,955,750.1 382,071.3 0.2 4,110.39 MWD+IFR2+HDS+MS (6) 121.47 2,893.1 2,846.7 -1,757.7 3,834.4 5,955,734.1 382,096.4 0.8 4,138.71 MWD+IFR2+HDS+MS (6) 121.35 2,896.7 2,850.3 -1,773+2 3,859.8 5,955,718.2 382,121.6 0.4 4,167.05 MWD+IFR2+HDS+MS (6) 121.23 2,900.3 2,853.9 -1,788.7 3,885.2 5,955,702.3 382,146.8 0.6 4,195.41 MWD+IFR2+HDS+MS (6) 121.14 2,903.9 2,857.5 -1,804.1 3,910.7 5,955,686.5 382,172.0 0.3 4,223.79 MWD+IFR2+HDS+MS (6) 121.22 2,907.4 2,861.0 -1,819.5 3,936.2 5,955,670.6 382,197.2 0.3 4,252.17 MWD+IFR2+HDS+MS (6) 121.32 2,911.0 2,864.6 -1,835.0 3,961.7 5,955,654.8 382,222.4 0.4 4,280.53 MWD+IFR2+HDS+MS (6) 121.41 2,914.6 2,868.2 -1,850.5 3,987.1 5,955,638.8 382,247.6 0.4 4,308.88 MWD+IFR2+HDS+MS (6) 121.33 2,918.2 2,871.8 -1,866.0 4,012.5 5,955,622.9 382,272.8 1.1 4,337.22 MWD+IFR2+HDS+MS (6) 121.20 2,921.9 2,875.5 -1,881A 4,038.0 5,955,607.1 382,298.0 0.7 4,365.58 MWD+IFR2+HDS+MS(6) 121.07 2,925.5 2,879.1 -1,896.8 4,063.5 5,955,591.3 382,323.2 0.7 4,393.96 MWD+IFR2+HDS+MS (6) 121.23 2,929.0 2,882.6 -1,912.3 4,089.0 5,955,575.4 382,348.5 0.5 4,422.35 MWD+IFR2+HDS+MS (6) 121.54 2,932.6 2,886.2 -1,927.8 4,114.4 5,955,559.5 382,373.6 1.1 4,450.69 MWD+IFR2+HDS+MS (6) 121.85 2,936.2 2,889.8 -1,943.4 4,139.7 5,955,543.5 382,398.7 1.2 4,478.98 MWD+IFR2+HDS+MS (6) 122.13 2,939.9 2,893.5 -1,959.2 4,165.0 5,955,527.3 382,423.7 1.0 4,507.22 MWD+IFR2+HDS+MS (6) 122.38 2,943.5 2,897.1 -1,975.1 4,190.2 5,955,511.0 382,448.6 0.9 4,535.42 MWD+IFR2+HDS+MS (6) 122.63 2,947.1 2,900.7 -1,991.1 4,215.3 5,955,494.6 382,473.5 0.8 4,563.58 MWD+IFR2+HDS+MS (6) 122.73 2,950.6 2,904.2 -2,007.2 4,240.4 5,955,478.1 382,498.3 0.3 4,591.72 MWD+IFR2+HDS+MS (6) 122.55 2,954.2 2,907.8 -2,023.2 4,265.5 5,955,461.6 382,523.1 0.9 4,619.85 MWD+IFR2+HDS+MS (6) 122.38 2,957.9 2,911.5 -2,039.2 4,290.6 5,955,445.2 382,548.0 0.6 4,648.01 MWD+IFR2+HDS+MS (6) 122.22 2,961.7 2,915.3 -2,055.1 4,315.7 5,955,428.9 382,572.9 1.4 4,676.18 MWD+IFR2+HDS+MS (6) 122.10 2,965.7 2,919.3 -2,070.9 4,340.9 5,955,412.7 382,597.8 0.6 4,704.36 MWD+IFR2+HDS+MS (6) 121.98 2,969.5 2,923.1 -2,086.7 4,366.1 5,955,396.5 382,622.7 1.1 4,732.56 MWD+IFR2+HDS+MS (6) 121.92 2,973.3 2,926.9 -2,102.5 4,391.4 5,955,380.4 382,647.7 0.2 4,760.79 MWD+IFR2+HDS+MS (6) 122.08 2,977.1 2,930.7 -2,118.2 4,416.6 5,955,364.2 382,672.7 0.6 4,789.01 MWD+IFR2+HDS+MS (6) 122.27 2,980.9 2,934.5 -2,134.1 4,441.8 5,955,347.9 382,697.6 0.8 4,817.20 MWD+IFR2+HDS+MS (6) 122.43 2,984.7 2,938.3 -2,150.0 4,466.9 5,955,331.6 382,722.5 0.6 4,845.37 MWD+IFR2+HDS+MS (6) 122.44 2,988.4 2,942.0 -2,166.0 4,492.1 5,955,315.2 382,747.4 0.4 4,873.52 MWD+IFR2+HDS+MS (6) 122.42 2,992.1 2,945.7 -2,182.0 4,517.2 5,955,298.9 382,772.2 0.4 4,901.68 MWD+IFR2+HDS+MS (6) 122.40 2,995.9 2,949.5 -2,197.9 4,542.3 5,955,282.5 382,797.1 0.1 4,929.84 MWD+IFR2+HDS+MS (6) 122.38 2,999.6 2,953.2 -2,213.9 4,567.5 5,955,266.2 382,822.0 0.1 4,958.00 MWD+IFR2+HDS+MS (6) 122.36 3,003.3 2,956.9 -2,229.8 4,592.6 5,955,249.8 382,846.8 0.2 4,986.17 MWD+IFR2+HDS+MS (6) 122.34 3,007.0 2,960.6 -2,245.7 4,617.8 5,955,233.5 382,871.7 0.2 5,014.35 MWD+IFR2+HDS+MS (6) 122.20 3,010.6 2,964.2 -2,261.6 4,642.9 5,955,217.2 382,896.7 0.5 5,042.54 MWD+IFR2+HDS+MS (6) 121.99 3,014.3 2,967.9 -2,277.4 4,668.2 5,955,201.0 382,921.6 0.8 5,070.76 MWD+IFR2+HDS+MS (6) 1212312019 12:11:38PM Page 7 COMPASS 5000.14 Build 85H ConocoPhillips Definitive Survey Report Company: NADConversion Local Coordinate Reference: Well CD4-594 Project: North Alaska ASP4 TVD Reference: CD4-594 Actual @ 46.4usft Site: CD4 Nanuq Pad MD Reference: CD4-594 Actual @ 46.4usft Well: CD4-594 North Reference: True Wellbore: CD4-594PH1 Survey Calculation Method: Minimum Curvature Design: CD4-594PH1 Database: EDT 14 Alaska Production Survey Map Map Vertical MD Inc Azi TVD TVDSS +N/-S +E/-W Northing Easting DLS Section (usft) 0 (1) (usft) (usft) (usft) (usft) (ft) (ft) (°/100-) (ft) Survey Tool Name 6,971.0 82.89 121.78 3,018.1 2,971.7 -2,293.2 4,693.4 5,955,184.8 382,946.6 0.7 5,099.01 MWD+IFR2+HDS+MS (6) 7,001.0 82.80 121.69 3,021.8 2,975.4 -2,308.8 4,718.7 5,955,168.8 382,971.7 0.4 5,127.28 MWD+IFR2+HDS+MS (6) 7,031.0 82.68 121.73 3,025.6 2,979.2 -2,324.5 4,744.1 5,955,152.7 382,996.7 0.4 5,155.55 MWD+IFR2+HDS+MS (6) 7,061.0 82.61 121.77 3,029.4 2,983.0 -2,340.1 4,769.4 5,955,136.7 383,021.8 0.3 5,183.80 MWD+IFR2+HDS+MS (6) 7,091.0 82.54 121.88 3,033.3 2,986.9 -2,355.8 4,794.6 5,955,120.6 383,046.8 0.4 5,212.04 MWD+IFR2+HDS+MS (6) 7,121.0 82.53 122.18 3,037.2 2,990.8 -2,371.6 4,819.9 5,955,104.4 383,071.8 1.0 5,240.25 MWD+IFR2+HDS+MS (6) 7,151.0 82.53 122.48 3,041.1 2,994.7 -2,387.5 4,845.0 5,955,088.1 383,096.6 1.0 5,268.40 MWD+IFR2+HDS+MS (6) 7,181.0 82.55 122.78 3,045.0 2,998.6 -2,403.5 4,870.0 5,955,071.6 383,121.4 1.0 5,296.50 MWD+IFR2+HDS+MS (6) 7,211.0 82.54 123.08 3,048.9 3,002.5 -2,419.7 4,895.0 5,955,055.1 383,146.1 1.0 5,324.55 MWD+IFR2+HDS+MS (6) 7,241.0 82.81 123.37 3,052.7 3,006.3 -2,436.0 4,919.9 5,955,038.4 383,170.7 1.3 5,352.56 MWD+IFR2+HDS+MS (6) 7,271.0 83.08 123.60 3,056.4 3,010.0 -2,452.4 4,944.7 5,955,021.5 383,195.3 1.2 5,380.54 MWD+IFR2+HDS+MS (6) 7,301.0 82.34 123.46 3,060.2 3,013.8 -2,468.9 4,969.5 5,955,004.7 383,219.8 2.5 5,408.50 MWD+IFR2+HDS+MS (6) 7,331.0 82.25 123.27 3,064.2 3,017.8 -2,485.2 4,994.4 5,954,987.9 383,244.4 0.7 5,436.46 MWD+IFR2+HDS+MS (6) 7,361.0 82.44 123.09 3,068.2 3,021.8 -2,501.5 5,019.2 5,954,971.3 383,269.0 0.9 5,464.45 MWD+IFR2+HDS+MS (6) 7,391.0 82.49 123.12 3,072.2 3,025.8 -2,517.7 5,044.2 5,954,954.6 383,293.7 0.2 5,492.47 MWD+IFR2+HDS+MS (6) 7,421.0 82.59 123.21 3,076.0 3,029.6 -2,534.0 5,069.1 5,954,938.0 383,318.3 0.4 5,520.48 MWD+IFR2+HDS+MS (6) 7,451.0 82.70 123.30 3,079.9 3,033.5 -2,550.3 5,093.9 5,954,921.2 383,342.9 0.5 5,548.48 MWD+IFR2+HDS+MS (6) 7,481.0 82.69 123.29 3,083.7 3,037.3 -2,566.7 5,118.8 5,954,904.5 383,367.5 0.0 5,576.48 MWD+IFR2+HDS+MS (6) 7,511.0 82.72 123.25 3,087.5 3,041.1 -2,583.0 5,143.7 5,954,887.8 383,392.1 0.2 5,604.48 MWD+IFR2+HDS+MS (6) 7,541.0 82.67 123.20 3,091.3 3,044.9 -2,599.3 5,168.6 5,954,871.1 383,416.7 0.2 5,632.49 MWD+IFR2+HDS+MS (6) 7,571.0 82.73 123.14 3,095.1 3,048.7 -2,615.6 5,193.5 5,954,854.4 383,441.4 0.3 5,660.51 MWD+IFR2+HDS+MS (6) 7,601.0 82.69 123.08 3,098.9 3,052.5 -2,631.8 5,218.4 5,954,837.8 383,466.0 0.2 5,688.54 MWD+IFR2+HDS+MS (6) 7,631.0 82.71 123.02 3,102.8 3,056.4 -2,648.0 5,243.4 5,954,821.1 383,490.7 0.2 5,716.58 MWD+IFR2+HDS+MS (6) 7,661.0 82.74 122.90 3,106.6 3,060.2 -2,664.2 5,268.3 5,954,804.5 383,515.4 0.4 5,744.64 MWD+IFR2+HDS+MS (6) 7,691.0 82.53 122.69 3,110.4 3,064.0 -2,680.4 5,293.3 5,954,788.0 383,540.1 1.0 5,772.72 MWD+IFR2+HDS+MS (6) 7,721.0 82.20 122.49 3,114+4 3,068.0 -2,696.4 5,318.4 5,954,771.6 383,564.9 1.3 5,800.82 MWD+IFR2+HDS+MS (6) 7,751.0 82.02 122.35 3,118.5 3,072.1 -2,712.3 5,343.5 5,954,755.3 383,589.8 0.8 5,828.93 MWD+IFR2+HDS+MS (6) 7,781.0 82.09 122.35 3,122.7 3,076.3 -2,728.2 5,368.6 5,954,739.0 383,614.6 0.2 5,857.05 MWD+IFR2+HDS+MS (6) 7,811.0 81.97 122.35 3,126.8 3,080.4 -2,744.1 5,393.7 5,954,722.7 383,639.4 0.4 5,885.16 MWD+IFR2+HDS+MS (6) 7,841.0 81.80 122.37 3,131.0 3,084.6 -2,760.0 5,418.8 5,954,706.4 383,664.3 0.6 5,913.27 MWD+IFR2+HDS+MS (6) 7,871.0 81.99 122.45 3,135.3 3,088.9 -2,775.9 5,443.8 5,954,690.0 383,689.1 0.7 5,941.36 MWD+IFR2+HDS+MS (6) 7,901.0 82.15 122.52 3,139.4 3,093.0 -2,791.9 5,468.9 5,954,673.7 383,713.9 0.6 5,969.46 MWD+IFR2+HDS+MS (6) 7,931.0 82.19 122.60 3,143.5 3,097.1 -2,807.9 5,494.0 5,954,657.3 383,738.6 0.3 5,997.55 MWD+IFR2+HDS+MS (6) 7,961.0 82.24 122.69 3,147.6 3,101.2 -2,823.9 5,519.0 5,954,640.8 383,763.4 0.3 6,025.63 MWD+IFR2+HDS+MS (6) 7,991.0 82.25 122.78 3,151.6 3,105.2 -2,840.0 5,544.0 5,954,624A 383,788.2 0.3 6,053.70 MWD+IFR2+HDS+MS (6) 8,021.0 82.30 122.87 3,155.6 3,109.2 -2,856.1 5,569.0 5,954,607.9 383,812.9 0.3 6,081.75 MWD+IFR2+HDS+MS (6) 8,051.0 82.37 122.87 3,159.6 3,113.2 -2,872.2 5,593.9 5,954,591.3 383,837.6 0.2 6,109.80 MWD+IFR2+HDS+MS (6) 8,081.0 82.44 122.84 3,163.6 3,117.2 -2,888.4 5,618.9 5,954,574.8 383,862.3 0.3 6,137.85 MWD+IFR2+HDS+MS (6) 8,111.0 82.50 122.82 3,167.5 3,121.1 -2,904.5 5,643.9 5,954,558+3 383,887.0 0.2 6,165.92 MWD+IFR2+HDS+MS (6) 8,141.0 8237 122.71 3,171.5 3,125.1 -2,920.6 5,668.9 5,954,541.8 383,911.8 0.6 6,193.99 MWD+IFR2+HDS+MS(6) 12/23/2019 12:11.38PM Page 8 COMPASS 5000.14 Build 85H ConocoPhillips Definitive Survey Report Company: NADConversion Local Co-ordinate Reference: Well CD4-594 Project: North Alaska ASP4 TVD Reference: CD4-594 Actual @ 46.4usft Site: CD4 Nanuq Pad MD Reference: CD4-594 Actual @ 46.4usft Well: CD4-594 North Reference: True Wellbore: CD4-594PH1 Survey Calculation Method: Minimum Curvature Design: CD4-594PH1 Database: EDT 14 Alaska Production Survey Map Map Vertical MD Inc Azi TVD TVDSS +N/-S +E/-W Northing Easting DLS Section (usft) (°) (°) (usft) (usft) (usft) (usft) (ft) (ft) (°/100-) (ft) Survey Tool Name 8,171.0 82.30 122.58 3,175.5 3,129.1 -2,936.6 5,694.0 5,954,525.3 383,936.5 0.5 6,222.08 MWD+IFR2+HDS+MS (6) 8,201.0 82.44 122.44 3,179.5 3,133.1 -2,952.6 5,719.0 5,954,508.9 383,961.3 0.7 6,250.19 MWD+IFR2+HDS+MS (6) 8,231.0 82.36 122.46 3,183.4 3,137.0 -2,968.5 5,744.1 5,954,492.6 383,986.2 0.3 6,278.31 MWD+IFR2+HDS+MS (6) 8,261.0 82.47 122.57 3,187.4 3,141.0 -2,984.5 5,769.2 5,954,476.2 384,011.0 0.5 6,306.43 MWD+IFR2+HDS+MS (6) 8,291.0 82.59 122.67 3,191.3 3,144.9 -3,000.6 5,794.3 5,954,459.8 384,035.8 0.5 6,334.53 MWD+IFR2+HDS+MS (6) 8,321.0 82.53 122.79 3,195.2 3,148.8 -3,016.7 5,819.3 5,954,443.3 384,060.5 0.4 6,362.62 MWD+IFR2+HDS+MS (6) 8,351.0 82.56 122.92 3,199.1 3,152.7 -3,032.8 5,844.3 5,954,426.7 384,085.2 0.4 6,390.68 MWD+IFR2+HDS+MS (6) 8,381.0 82.54 123.05 3,203.0 3,156.6 -3,049.0 5,869.2 5,954,410.1 384,109.9 0.4 6,418.72 MWD+IFR2+HDS+MS (6) 8,411.0 82A3 123.15 3,206.9 3,160.5 -3,065.2 5,894.1 5,954,393.5 384,134.6 0.5 6,446.74 MWD+IFR2+HDS+MS (6) 8,441.0 82.48 123.17 3,210.8 3,164.4 -3,081.5 5,919.0 5,954,376.8 384,159.2 0.2 6,474.75 MWD+IFR2+HDS+MS (6) 8,471.0 82.54 123.19 3,214.7 3,168.3 -3,097.8 5,943.9 5,954,360.2 384,183.8 0.2 6,502.76 MWD+IFR2+HDS+MS (6) 8,501.0 82.66 123.21 3,218.6 3,172.2 -3,114.1 5,968.8 5,954,343.5 384,208.5 0.4 6,530.76 MWD+IFR2+HDS+MS (6) 8,531.0 82.56 123.21 3,222.5 3,176.1 -3,130.4 5,993.7 5,954,326.8 384,233.1 0.3 6,558.77 MWD+IFR2+HDS+MS (6) 8,561.0 82.59 123.21 3,226.3 3,179.9 -3,146.6 6,018.6 5,954,310.1 384,257.7 0.1 6,586.78 MWD+IFR2+HDS+MS (6) 8,591.0 82.58 123.18 3,230.2 3,183.8 -3,162.9 6,043.5 5,954,293.4 384,282.3 0.1 6,614.78 MWD+IFR2+HDS+MS (6) 8,621.0 82.50 122.88 3,234.1 3,187.7 -3,179.2 6,068.4 5,954,276.8 384,307.0 1.0 6,642.82 MWD+IFR2+HDS+MS (6) 8,651.0 82.56 122.53 3,238.0 3,191.6 -3,195.2 6,093.5 5,954,260.3 384,331.8 1.2 6,670.91 MWD+IFR2+HDS+MS (6) 8,681.0 82.52 122.18 3,241.9 3,195.5 -3,211.1 6,118.6 5,954,244.0 384,356.6 1.2 6,699.06 MWD+IFR2+HDS+MS (6) 8,711.0 82.38 122.14 3,245.8 3,199.4 -3,227.0 6,143.8 5,954,227.7 384,381.5 0.5 6,727.23 MWD+IFR2+HDS+MS (6) 8,741.0 82.44 122.21 3,249.8 3,203.4 -3,242.8 6,168+9 5,954,211.5 384,406.4 0.3 6,755.40 MWD+IFR2+HDS+MS (6) 8,771.0 82.48 122.29 3,253.7 3,207.3 -3,258.7 6,194.1 5,954,195.2 384,431.3 0.3 6,783.57 MWD+IFR2+HDS+MS (6) 8,801.0 82.54 122.20 3,257.7 3,211.3 -3,274.5 6,219.2 5,954,179.0 384,456.2 0.4 6,811.73 MWD+IFR2+HDS+MS (6) 8,831.0 82.46 121.99 3,261.6 3,215.2 -3,290.4 6,244.4 5,954,162.7 384,481.2 0.7 6,839.92 MWD+IFR2+HDS+MS (6) 8,861.0 82.51 121.78 3,265.5 3,219.1 -3,306.1 6,269.7 5,954,146.6 384,506.2 0.7 6,868.14 MWD+IFR2+HDS+MS (6) 8,891.0 82.47 121.77 3,269.4 3,223.0 -3,321.7 6,295.0 5,954,130.6 384,531.2 0.1 6,896.39 MWD+IFR2+HDS+MS (6) 8,921.0 82.46 122.01 3,273.4 3,227.0 -3,337.4 6,320.2 5,954,114.4 384,556.2 0.8 6,924.61 MWD+IFR2+HDS+MS (6) 8,951.0 82.51 122.25 3,277.3 3,230.9 -3,353.3 6,345.4 5,954,098.2 384,581.1 0.8 6,952.79 MWD+IFR2+HDS+MS (6) 8,981.0 82.40 122.37 3,281.2 3,234.8 -3,369.1 6,370.6 5,954,081.9 384,606.0 0.5 6,980.94 MWD+IFR2+HDS+MS (6) 9,011.0 82.45 122.21 3,285.2 3,238.8 -3,385.0 6,395.7 5,954,065.6 384,630.9 0.6 7,009.10 MWD+IFR2+HDS+MS (6) 9,041.0 82.52 122.05 3,289.1 3,242.7 -3,400.9 6,420.9 5,954,049.4 384,655.8 0.6 7,037.28 MWD+IFR2+HDS+MS (6) 9,071.0 82.55 121.94 3,293.0 3,246.6 -3,416.6 6,446.1 5,954,033.2 384,680.7 0.4 7,065.49 MWD+IFR2+HDS+MS (6) 9,101.0 82.60 122.08 3,296.9 3,250.5 -3,432.4 6,471.3 5,954,017.1 384,705.7 0.5 7,093.70 MWD+IFR2+HDS+MS (6) 9,131.0 82.68 122.25 3,300.7 3,254.3 -3,448.2 6,496.5 5,954,000.8 384,730.6 0.6 7,121.88 MWD+IFR2+HDS+MS (6) 9,161.0 82.53 122.39 3,304.6 3,258.2 -3,464.1 6,521.7 5,953,984.5 384,755.5 0.7 7,150.04 MWD+IFR2+HDS+MS (6) 9,191.0 82.42 122.35 3,308.5 3,262.1 -3,480.1 6,546.8 5,953,968.2 384,780.4 0.4 7,178.19 MWD+IFR2+HDS+MS (6) 9,221.0 82.38 122.27 3,312.5 3,266.1 -3,495.9 6,571.9 5,953,951.9 384,805.2 0.3 7,206.33 MWD+IFR2+HDS+MS (6) 9,251.0 82.48 122.19 3,316.4 3,270.0 -3,511.8 6,597.1 5,953,935+6 384,830.1 0.4 7,234.50 MWD+IFR2+HDS+MS (6) 9,281.0 82.44 122.22 3,320.4 3,274.0 -3,527.7 6,622.2 5,953,919.4 384,855.0 0.2 7,262.67 MWD+IFR2+HDS+MS (6) 9,311.0 82.49 122.28 3,324.3 3,277.9 -3,543.5 6,647.4 5,953,903.1 384,879.9 0.3 7,290.83 MWD+IFR2+HDS+MS (6) 9,341+0 82.56 122.34 3,328.2 3,281.8 -3,559A 6,672.5 5,953,886.6 384,904.8 0.3 7,318.98 MWD+IFR2+HDS+MS (6) 1212WO19 12:11:38PM Page 9 COMPASS 5000.14 Build 85H ConocoPhillips ` Definitive Survey Report Company: NADConversion Local Co-ordinate Reference: Well CD4-594 Project: North Alaska ASP4 ND Reference: CD4-594 Actual @ 46.4usft Site: CD4 Nanuq Pad MD Reference: CD4-594 Actual @ 46.4usft Well: CD4-594 North Reference: True Wellbore: CD4-594PH1 Survey Calculation Method: Minimum Curvature Design: CD4-594PH1 Database: EDT 14 Alaska Production Survey Map Map Vertical MD Inc Azi TVD TVDSS +N/-S +E/-W Northing Easting US Section (usft) (°) (°) (usft) (usft) (usft) (usft) (ft) (ft) (°/100-) (ft) Survey Tool Name 9,371.0 82.34 122.30 3,332.1 3,285.7 -3,575.3 6,697.7 5,953,870.5 384,929.7 0.7 7,347.13 MWD+IFR2+HDS+MS (6) 9,401.0 82.43 122.21 3,336.1 3,289.7 -3,591.2 6,722.8 5,953,854.2 384,954.6 0.4 7,375.29 MWD+IFR2+HDS+MS (6) 9,431.0 82.47 122.12 3,340.1 3,293.7 -3,607+0 6,748.0 5,953,838.0 384,979.5 0.3 7,403.46 MWD+IFR2+HDS+MS (6) 9,461.0 82.47 122.10 3,344.0 3,297.6 -3,622.8 6,773.2 5,953,821.8 385,004.4 0.1 7,431.65 MWD+IFR2+HDS+MS (6) 9,491.0 82.47 122.15 3,347.9 3,301.5 -3,638.7 6,798.4 5,953,805.6 385,029.3 0.2 7,459.83 MWD+IFR2+HDS+MS (6) 9,521.0 82.51 122.20 3,351.8 3,305.4 -3,654.5 6,823.5 5,953,789.3 385,054.2 0.2 7,488.01 MWD+IFR2+HDS+MS (6) 9,551.0 82.42 122.28 3,355.8 3,309.4 -3,670.4 6,848.7 5,953,773.0 385,079.1 0.4 7,516.17 MWD+IFR2+HDS+MS (6) 9,581.0 82.44 122.43 3,359.7 3,313.3 -3,686.3 6,873.8 5,953,756.7 385,104.0 0.5 7,544.32 MWD+IFR2+HDS+MS (6) 9,611.0 82.47 122.58 3,363.7 3,317.3 -3,702.3 6,898.9 5,953,740+3 385,128.8 0.5 7,572.43 MWD+IFR2+HDS+MS (6) 9,641.0 82.27 122.74 3,367.6 3,321.2 -3,718.3 6,923.9 5,953,723.9 385,153.6 0.9 7,600.52 MWD+IFR2+HDS+MS (6) 9,671.0 82.21 122.90 3,371.7 3,325.3 -3,734.4 6,948.9 5,953,707.4 385,178.3 0.6 7,628.57 MWD+IFR2+HDS+MS (6) 9,701.0 82.35 123.07 3,375.7 3,329.3 -3,750.6 6,973.8 5,953,690.8 385,203.0 0.7 7,656.60 MWD+IFR2+HDS+MS (6) 9,731.0 82.41 123,24 3,379.7 3,333.3 -3,766.9 6,998.7 5,953,674.1 385,227.6 0.6 7,684.60 MWD+IFR2+HDS+MS (6) 9,761.0 82.52 123.44 3,383.6 3,337.2 -3,783.2 7,023.6 5,953,657.4 385,252.2 0.8 7,712.57 MWD+IFR2+HDS+MS (6) 9,791.0 82.62 123.65 3,387.5 3,341.1 -3,799.6 7,048.4 5,953,640.6 385,276.7 0.8 7,740.52 MWD+IFR2+HDS+MS (6) 9,821.0 82.64 123.86 3,391.4 3,345.0 -3,816.2 7,073.1 5,953,623.6 385,301.2 0.7 7,768A3 MWD+IFR2+HDS+MS (6) 9,851.0 82.71 123.97 3,395.2 3,348.8 -3,832.8 7,097.8 5,953,606.6 385,325.6 0.4 7,796.32 MWD+IFR2+HDS+MS (6) 9,881.0 82.68 124.05 3,399+0 3,352.6 -3,849.4 7,122.5 5,953,589.6 385,350.0 0.3 7,824.19 MWD+IFR2+HDS+MS (6) 9,911.0 82.65 124.13 3,402.8 3,356.4 -3.866.1 7,147.1 5,953,572.5 385,374.3 0.3 7,852.04 MWD+IFR2+HDS+MS (6) 9,941.0 82.75 123.93 3,406.6 3,360.2 -3,882.7 7,171.8 5,953,555.5 385,398.7 0.7 7,879.90 MWD+IFR2+HDS+MS (6) 9,971.0 82.69 123.59 3,410.4 3,364.0 -3,899.3 7,196.5 5,953,538.5 385,423.2 1A 7,907.82 MWD+IFR2+HDS+MS (6) 10,001.0 82.73 123.25 3,414.3 3,367.9 -3,915.7 7,221.4 5,953,521.7 385,447.7 1A 7,935.80 MWD+IFR2+HDS+MS(6) 10,031.0 82.64 122.98 3,418.1 3,371.7 -3,931.9 7,246.3 5,953,505.1 385,472.4 0.9 7,963.83 MWD+IFR2+HDS+MS (6) 10,061.0 82.60 122.77 3,421.9 3,375.5 -3,948.1 7,271.3 5,953,488.5 385,497.1 0.7 7,991.89 MWD+IFR2+HDS+MS (6) 10,091.0 82.63 122.56 3,425.8 3,379.4 -3,964.1 7,296.3 5,953,472.1 385,521.9 0.7 8,019.99 MWD+IFR2+HDS+MS (6) 10,121.0 82.64 122.37 3,429.6 3,383.2 -3,980.1 7,321.4 5,953,455.7 385,546.7 0.6 8,048.13 MWD+IFR2+HDS+MS(6) 10,151.0 82.56 122.22 3,433.5 3,387.1 -3,996.0 7,346.6 5,953,439A 385,571.6 0.6 8,076.29 MWD+IFR2+HDS+MS (6) 10,181.0 82.52 122.08 3,437.4 3,391.0 4,011.8 7,371.7 5,953,423.2 385,596.5 0.5 8,104.48 MWD+IFR2+HDS+MS (6) 10,203.7 82.63 121.96 3,440.3 3,393.9 -4,023.8 7,390.9 5,953,410.9 385,615.5 0.7 8,125.86 MWD+IFR2+HDS+MS (6) 10.260.0 83.08 120.03 3,447.3 3,400.9 -4,052.5 7,438.7 5,953,381.4 385,662.8 3.5 8,179.10 NOT an Actual Survey 9 5/8" x 12 1/4" 10,303.3 83.44 118.55 3,452.4 3,406.0 4,073.6 7,476.2 5,953,359.7 385,700.0 3.5 8,220.50 MWD+IFR2+HDS+MS (7) 10,333.0 83.90 119.84 3,455.7 3,409.3 4,088.0 7,502.0 5,953,344.9 385,725.5 4.6 8,248.89 MWD+IFR2+HDS+MS (7) 10,363.0 84.64 120.93 3,458.7 3,412.3 -4,103.1 7,527.7 5,953,329.4 385,751.0 4.4 8,277.45 MWD+IFR2+HDS+MS (7) 10,393.0 85.33 122.03 3,461.3 3,414.9 -4,118.7 7,553.2 5,953,313.4 385,776.3 4.3 8,305.88 MWD+IFR2+HDS+MS (7) 10,423.0 85.84 123.27 3,463.6 3,41T2 -4,134.8 7,578.4 5,953,296.9 385,801.2 4.5 8,334,13 MWD+IFR2+HDS+MS (7) 10,453.0 86.07 124.70 3,465.7 3,419.3 -4,151.5 7,603.2 5,953,279.7 385,825.7 4.8 8,362.16 MWD+IFR2+HDS+MS (7) 10,483.0 86.19 126.12 3,467.7 3,421.3 4,168.9 7,627.6 5,953,262.0 385,849.8 4.7 8,389.93 MWD+IFR2+HDS+MS (7) 10,513.0 86.03 127.11 3,469.8 3,423.4 -4,186.7 7,651.6 5,953,243.8 385,873.5 3.3 8,417.46 MWD+IFR2+HDS+MS(7) 10,543.0 86.17 127.20 3,471.8 3,425.4 -4,204.8 7,675.5 5,953,225.3 385,897.1 0.6 8,444.87 MWD+IFR2+HDS+MS (7) 1212312019 12:11.38PM Page 10 COMPASS 5000.14 Build 85H ConocoPhillips Definitive Survey Report Company: NADConversion Local Coordinate Reference: Well CD4-594 Project: North Alaska ASP4 TVD Reference: CD4-594 Actual @ 46.4usft Site: CD4 Nanuq Pad MD Reference: CD4-594 Actual @ 46.4usft Well: CD4-594 North Reference: True Wellbore: CD4-594PH1 Survey Calculation Method: Minimum Curvature Design: CD4-594PH1 Database: EDT 14 Alaska Production Survey Map Map Vertical MD Inc Azi TVD TVDSS +N/-S +E/-W Northing Easting DLS Section (usft) (°) (°) (usft) (usft) (usft) (usft) (ft) (ft) (°/100') (ft) Survey Tool Name 10,573.0 86.10 127.29 3,473+8 3,427.4 -4,222.9 7,699+3 5,953,206.8 385,920.6 0.4 8,472.27 MWD+IFR2+HDS+MS (7) 10,603.0 86.03 127.37 3,475.9 3,429.5 -4,241.1 7,723.1 5,953,188.3 385,944.1 0.4 8,499.65 MWD+IFR2+HDS+MS (7) 10,633.0 86.08 127.39 3,478.0 3,431.6 -4,259.2 7,746.9 5,953,169.7 385,967.6 0.2 8,527.01 MWD+IFR2+HDS+MS (7) 10,663.0 86.04 127.41 3,480.0 3,433.6 -4,277.4 7,770.7 5,953,151.2 385,991.1 0.1 8,554.37 MWD+IFR2+HDS+MS (7) 10,693.0 86.04 127.41 3,482.1 3,435.7 -4,295.6 7,794.4 5,953,132.6 386,014.6 0.0 8,581.73 MWD+IFR2+HDS+MS (7) 10,723.0 86.09 127.29 3,484.2 3,437.8 -4,313.8 7,818.2 5,953,114.1 386,038.1 0.4 8,609.11 MWD+IFR2+HDS+MS (7) 10,753.0 86.05 127.16 3,486+2 3,439.8 -4,331.9 7,842.1 5,953,095.6 386,061.6 0.5 8,636.51 MWD+IFR2+HDS+MS (7) 10,783.0 86.02 127.02 3,488.3 3,441.9 -4,349.9 7,865.9 5,953,077.2 386,085.2 0.5 8,663.93 MWD+IFR2+HDS+MS (7) 10,813.0 86.04 126.73 3,490.4 3,444.0 -4,36T9 7,889.9 5,953,058.8 386,108.8 1.0 8,691.40 MWD+IFR2+HDS+MS (7) 10,843.0 86.04 126.40 3,492.4 3,446.0 -4,385.7 7,913.9 5,953,040.6 386,132.6 1.1 8,718.94 MWD+IFR2+HDS+MS (7) 10,873.0 85.99 126.07 3,494.5 3,448.1 A,403.4 7,938.1 5,953,022.5 386,156.4 1.1 8,746.54 MWD+IFR2+HDS+MS (7) 10,903.0 86.10 125.98 3,496.6 3,450.2 -4,421.0 7,962.3 5,953,004.5 386,180.3 0.5 8,774.18 MWD+IFR2+HDS+MS(7) 10,933.0 85.98 125.99 3,498.7 3,452.3 -4,438.6 7,986.5 5,952,986.6 386,204.2 0.4 8,801.84 MWD+IFR2+HDS+MS (7) 10,963.0 86.13 126.00 3,500.7 3,454.3 -4,456.2 8,010.7 5,952,968.6 386,228.2 0.5 8,829.49 MWD+IFR2+HDS+MS (7) 10,993.0 86.08 126.03 3,502.8 3,456.4 -4,473.8 8,034.9 5,952,950.6 386,252.1 0.2 8,857.14 MWD+IFR2+HDS+MS (7) 11,023.0 86.09 126.06 3,504.8 3,458.4 -4,491.4 8,059.1 5,952,932.6 386,276.0 0.1 8,884.78 MWD+IFR2+HDS+MS (7) 11,053.0 86.08 126.09 3,506.9 3,460.5 -4,509.0 8,083.3 5,952,914.6 386,299.9 0.1 8,912.41 MWD+IFR2+HDS+MS (7) 11,083.0 86.15 126.10 3,508.9 3,462.5 A.526.6 8,107.5 5,952,896.6 386,323.8 0.2 8,940.05 MWD+IFR2+HDS+MS (7) 11,113.0 86.09 126.08 3,510.9 3,464.5 -4,544.3 8,131.7 5,952,878.5 386,347.7 0.2 8,967.68 MWD+IFR2+HDS+MS (7) 11,143.0 86.07 126.05 3,513.0 3,466.6 -4,561.9 8,155.9 5,952,860.5 386,371.6 0.1 8,995.32 MWD+IFR2+HDS+MS (7) 11,173.0 86.08 126.03 3,515.0 3,468.6 A,579.5 8,180.1 5,952,842.5 386,395.5 0.1 9,022.96 MWD+IFR2+HDS+MS (7) 11,203.0 86.06 126.00 3,517.1 3,470.7 A,597.1 8,204.3 5,952,824.6 386,419.4 0.1 9,050.61 MWD+IFR2+HDS+MS (7) 11,233.0 86.10 125.97 3,519.1 3,472.7 -4,614.7 8,228.5 5,952,806.6 386,443.4 0.2 9,078.26 MWD+IFR2+HDS+MS (7) 11,263.0 86.04 125.94 3,521.2 3,474.8 -4,632.3 8,252.7 5,952,788.6 386,467.3 0.2 9,105.92 MWD+IFR2+HDS+MS (7) 11,293.0 86.07 125.89 3,523.3 3,476.9 -4,649.8 8,277.0 5,952,770.7 386,491.2 0.2 9,133.59 MWD+IFR2+HDS+MS (7) 11,323.0 86.08 125.83 3,525.3 3,478.9 A,667.3 8,301.2 5,952,752.8 386,515.2 0.2 9,161.27 MWD+IFR2+HDS+MS (7) 11,353.0 86.11 125.77 3,527.4 3,481.0 -4,684.9 8,325.5 5,952,734.9 386,539.2 0.2 9,188.96 MWD+IFR2+HDS+MS (7) 11,383.0 85.99 125.65 3,529.4 3,483.0 -4,702.3 8,349.8 5,952,717.0 386,563.2 0.6 9,216.67 MWD+IFR2+HDS+MS (7) 11,413.0 86.11 125.53 3,531.5 3,485.1 -4,719.7 8,374.1 5,952,699.2 386,587.3 0.6 9,244.40 MWD+IFR2+HDS+MS (7) 11,443.0 85.96 125.40 3,533.6 3,487.2 A,737.1 8,398.5 5,952,681.4 386,611.3 0.7 9,272.15 MWD+IFR2+HDS+MS (7) 11,473.0 86.11 125.13 3,535.6 3,489.2 A,754.4 8,422.9 5,952,663+8 386,635.5 1.0 9,299.95 MWD+IFR2+HDS+MS (7) 11,503.0 86.06 124.81 3,537.7 3,491.3 -4,771.5 8,447.5 5,952,646.2 386,659.7 1.1 9,327.80 MWD+IFR2+HDS+MS (7) 11,533.0 86.12 124.48 3,539.7 3,493.3 -4,788.6 8,472.1 5,952,628.8 386,684.1 1.1 9,355.71 MWD+IFR2+HDS+MS (7) 11,563.0 85.92 124.26 3,541.8 3,495.4 A,805.4 8,496.8 5,952,611.5 386,708.5 1.0 9,383.68 MWD+IFR2+HDS+MS (7) 11,593.0 85.89 124.10 3,544.0 3,497.6 A,822.3 8,521.6 5,952,594.3 386,733.0 0.5 9,411.67 MWD+IFR2+HDS+MS (7) 11,623.0 85.99 123.94 3,546.1 3,499.7 -4,839.0 8,546.4 5,952,577.2 386,757.5 0.6 9,439.70 MWD+IFR2+HDS+MS (7) 11,653.0 86.19 123.95 3,548.1 3,501.7 -4,855.7 8,571.2 5,952,560.1 386,782.1 0.7 9,467.74 MWD+IFR2+HDS+MS (7) 11,683.0 86.82 124.17 3,550.0 3,503.6 -4,872.5 8,596.0 5,952,542.9 386,806.6 2.2 9,495.78 MWD+IFR2+HDS+MS (7) 11,713.0 86.46 124.39 3,551.7 3,505.3 -4,889.4 8,620.7 5,952,525.6 386,831.1 1.4 9,523.78 MWD+IFR2+HDS+MS (7) 11,743.0 86.31 124.54 3,553.6 3,507.2 A.906.3 8,645A 5,952,508.3 386,855.5 0.7 9,551.74 MWD+IFR2+HDS+MS (7) 121232019 12:11:38PM Page 11 COMPASS 5000.14 Build 85H ConocoPhillips Definitive Survey Report Company: NADConversion Local Coordinate Reference: Well CD4-594 Project: North Alaska ASP4 TVD Reference: CD4-594 Actual @ 46.4usft Site: CD4 Nanuq Pad MD Reference: CD4-594 Actual @ 46.4usft Well: CD4-594 North Reference: True Wellbore: CD4-594PH1 Survey Calculation Method: Minimum Curvature Design: CD4-594PH1 Database: EDT 14 Alaska Production Survey Map Map Vertical MD Inc Azi TVD TVDSS +Nl-S +EI-W Northing Easting DLS Section (usft) (°) (°) (usft) (usft) (usft) (usft) (ft) (ft) (°/100') (ft) Survey Tool Name 11,773.0 85.79 124.53 3,555.7 3,509.3 -4,923.3 8,670.1 5,952,490.9 386,879.8 1.7 9,579.67 MWD+IFR2+HDS+MS (7) 11,803.0 86.11 124.51 3,557.8 3,511.4 -4,940.2 8,694.7 5,952,473.6 386,904.2 1.1 9,607.60 MWD+IFR2+HDS+MS (7) 11,833.0 86.04 124.56 3,559.8 3,513.4 -4,957.2 8,719.4 5,952,456.2 386,928.6 0.3 9,635.54 MWD+IFR2+HDS+MS (7) 11,863.0 85.94 124.79 3,561.9 3,515.5 -4,974.2 8,744.0 5,952,438.8 386,952.9 0.8 9,663.44 MWD+IFR2+HDS+MS (7) 11,893.0 86.21 125.04 3,564.0 3,517.6 -4,991.3 8,768.5 5,952,421.3 386,977+2 1.2 9,691.30 MWD+IFR2+HDS+MS (7) 11,923.0 86.07 125.29 3,566.0 3,519.6 -5,008.6 8,793.0 5,952,403.6 387,001.4 1.0 9,719.12 MWD+IFR2+HDS+MS (7) 11,953.0 86.21 125.50 3,568.0 3,521.6 -5,025.9 8,817.4 5,952,385.9 387,025.5 0.8 9,746.89 MWD+IFR2+HDS+MS (7) 11,983.0 86.01 125.71 3,570.1 3,523.7 -5,043.3 8,841.7 5,952,368.1 387,049.5 1.0 9,774.62 MWD+IFR2+HDS+MS (7) 12,013.0 85.99 125.93 3,572.2 3,525.8 -5,060.9 8,866.0 5,952,350.2 387,073.5 0.7 9,802.31 MWD+IFR2+HDS+MS (7) 12,043.0 86.16 126.27 3,574.2 3,527.8 -5,078.5 8,890.2 5,952,332.2 387,097.4 1.3 9,829.94 MWD+IFR2+HDS+MS (7) 12,073.0 86.07 126.66 3,576.2 3,529.8 -5,096.3 8,914.3 5,952,314.0 387,121.2 1.3 9,857.50 MWD+IFR2+HDS+MS (7) 12,103.0 86.12 127.05 3,578.3 3,531.9 -5,114.2 8,938.2 5,952,295.6 387,144.8 1.3 9,884.97 MWD+IFR2+HDS+MS (7) 12,133.0 85.92 127.39 3,580.4 3,534.0 -5,132.3 8,962.0 5,952,277.2 387,168.4 1.3 9,912.37 MWD+IFR2+HDS+MS (7) 12,163.0 86.14 127.71 3,582A 3,536.0 -5,150.6 8,985.8 5,952,258.5 387,191.8 1.3 9,939.70 MWD+IFR2+HDS+MS (7) 12,193.0 86.23 128.03 3,584.4 3,538.0 -5,169.0 9,009.4 5,952,239.8 387,215.1 1.1 9,966.97 MWD+IFR2+HDS+MS (7) 12,223.0 86.07 128.14 3,586.5 3,540.1 -5,187.4 9,033.0 5,952,220.9 387,238A 0.6 9,994.19 MWD+IFR2+HDS+MS (7) 12,253.0 86.13 128.06 3,588.5 3,542.1 -5,205.9 9,056.5 5,952,202.1 387,261.6 0.3 10,021.40 MWD+IFR2+HDS+MS (7) 12,283.0 86.13 127.97 3,590.5 3,544.1 -5,224.3 9,080.1 5,952,183.3 387,284.9 0.3 10,048.63 MWD+IFR2+HDS+MS (7) 12,313.0 86.09 127.95 3,592.6 3,546.2 -5,242.7 9,103.7 5,952,164.5 387,308.2 0.1 10,075.87 MWD+IFR2+HDS+MS (7) 12,343.0 86.00 128.01 3,594.6 3,548.2 -5,261.1 9,127.3 5,952,145.7 387,331.5 0.4 10,103.11 MWD+IFR2+HDS+MS (7) 12,373.0 86.18 128.07 3,596.7 3,550.3 -5,279.6 9,150.9 5,952,126.9 387,354.8 0.6 10,130.34 MWD+IFR2+HDS+MS (7) 12,403.0 86.12 128.04 3,598.7 3,552.3 -5,298.0 9,174.4 5,952,108.1 387,378.0 0.2 10,157.56 MWD+IFR2+HDS+MS (7) 12,433.0 86.25 127.81 3,600.7 3,554.3 -5,316A 9,198.0 5,952,089.3 387,401.3 0.9 10,184.82 MWD+IFR2+HDS+MS (7) 12,463.0 86.09 127.58 3,602.7 3,556.3 -5,334.7 9,221.7 5,952,070.6 387,424.7 0.9 10,212.12 MWD+IFR2+HDS+MS (7) 12,493.0 85.27 127.44 3,604.9 3,558.5 -5,353.0 9,245.5 5,952,052.0 387,448.1 2.8 10,239.44 MWD+IFR2+HDS+MS (7) 12,523.0 83.63 127.64 3,607.9 3,561.5 -5,371.2 9,269.1 5,952,033.4 387,471.5 5.5 10,266.71 MWD+IFR2+HDS+MS (7) 12,553.0 82.40 127.87 3,611.5 3,565.1 -5,389A 9,292.7 5,952,014.8 387,494.8 4.2 10,293.86 MWD+IFR2+HDS+MS (7) 12,583.0 81.68 128.08 3,615.7 3,569.3 -5,407.7 9,316.1 5,951,996.2 387,517.9 2.5 10,320.90 MWD+IFR2+HDS+MS (7) 12,613.0 80.67 128.13 3,620.3 3,573.9 -5,426.0 9,339.4 5,951,977.5 387,540.9 3.4 10,347.85 MWD+IFR2+HDS+MS (7) 12,643.0 79.78 128.16 3,625.3 3,578.9 -5,444.2 9,362.7 5,951,958.9 387,563.9 3.0 10,374.72 MWD+IFR2+HDS+MS (7) 12,673.0 79.11 128.18 3,630.8 3,584.4 -5,462.4 9,385.9 5,951,940.3 387,586.7 2.2 10,401.52 MWD+IFR2+HDS+MS (7) 12.703.0 78.47 128.17 3,636.7 3,590.3 -5,480.6 9,409.0 5,951,921.7 387,609.6 2.1 10,428.26 MWD+IFR2+HDS+MS (7) 12,733.0 77.80 128.14 3,642.8 3,596.4 -5,498.8 9,432.1 5,951,903.2 387,632.4 2.2 10,454.94 MWD+IFR2+HDS+MS (7) 12,763.0 77.13 128.11 3,649.4 3,603.0 -5,516.8 9,455.1 5,951,884.7 387,655.1 2.2 10,481.56 MWD+IFR2+HDS+MS (7) 12,793.0 76.54 128.06 3,656.2 3,609.8 -5,534.9 9,478.1 5,951,866.4 387,677.8 2.0 10,508.13 MWD+IFR2+HDS+MS (7) 12,823.0 75.72 127.99 3,663.4 3,617.0 -5,552.8 9,501.1 5,951,848.1 387,700.4 2.7 10,534.62 MWD+IFR2+HDS+MS (7) 12,853.0 74.97 127.92 3,671.0 3,624.6 -5,570.7 9,523.9 5,951,829.8 387,723.0 2.5 10,561+04 MWD+IFR2+HDS+MS (7) 12,883.0 74.08 127.79 3,679.0 3,632.6 -5,588.4 9,546.8 5,951,811.7 387,745.6 3.0 10,587.38 MWD+IFR2+HDS+MS (7) 12,913.0 73.32 127.58 3,687.4 3,641.0 -5,606.0 9,569.6 5,951,793.8 387,768.1 2.6 10,613.65 MWD+IFR2+HDS+MS (7) 12,943.0 72.50 127.37 3,696.2 3,649.8 -5,623.5 9,592.3 5,951,775.9 387,790.5 2.8 10,639.85 MWD+IFR2+HDS+MS (7) 1212312019 12:11:38PM Page 12 COMPASS 5000.14 Build 85H ConocoPhillips Definitive Survey Report Company: NADConversion Local Co-ordinate Reference: Well CD4-594 Project: North Alaska ASP4 TVD Reference: CD4-594 Actual @ 46.4usft Site: CD4 Nanuq Pad MD Reference: CD4-594 Actual @ 46.4usft Well: CD4-594 North Reference: True Wellbore: CD4-594PH1 Survey Calculation Method: Minimum Curvature Design: CD4-594PH1 Database: EDT 14 Alaska Production Survey Map Map Vertical MD Inc Azi TVD TVDSS +N/-S +E1-W Northing Easting DLS Section (usft) (°) (°) (usft) (usft) (usft) (usft) (ft) (it) (°/100') (ft) Survey Tool Name 12,973.0 71.70 127.10 3,705.4 3,659.0 -5,640.7 9,615.0 5,951,758.3 387,813.0 2.8 10,665.98 MWD+IFR2+HDS+MS (7) 13,003.0 70.98 126.73 3,715.0 3,668.6 -5,657.8 9,637.8 5,951,740.9 387,835.4 2.7 10,692.06 MWD+IFR2+HDS+MS (7) 13,033.0 70.20 126.35 3,725.0 3,678.6 -5,674.6 9,660.5 5,951,723.7 387,857.9 2.9 10,718.10 MWD+IFR2+HDS+MS (7) 13,063.0 69.35 126.11 3,735.4 3,689.0 -5,691.3 9,683.2 5,951,706.7 387,880.3 2.9 10,744.06 MWD+IFR2+HDS+MS (7) 13,093.0 68.54 126.31 3,746.1 3,699.7 -5,707.8 9,705.8 5,951,689.8 387,902.6 2.8 10,769.89 MWD+IFR2+HDS+MS (7) 13,123.0 67.86 126.54 3,757.3 3,710.9 -5,724.4 9,728.2 5,951,672.9 387,924.8 2.4 10,795.54 MWD+IFR2+HDS+MS (7) 13,153.0 67.11 126.77 3,768.8 3,722.4 -5,740.9 9,750.4 5,951,656.0 387,946.7 2.6 10,821.02 MWD+IFR2+HDS+MS (7) 13,183.0 66.24 127.04 3,780.7 3,734.3 -5,757.4 9,772.5 5,951,639.1 387,968.5 3.0 10,846.30 MWD+IFR2+HDS+MS (7) 13,213.0 65.33 127.31 3,793.0 3,746.6 -5,774.0 9,794.3 5,951,622.2 387,990.0 3.1 10,871.36 MWD+IFR2+HDS+MS (7) 13,243.0 64.58 127.50 3,805.7 3,759.3 -5,790.5 9,815+9 5,951,605.3 388,011.3 2.6 10,896.21 MWD+IFR2+HDS+MS (7) 13,273.0 63.88 126.90 3,818.7 3,772.3 -5,806.8 9,837.4 5,951,588.7 388,032.6 2.9 10,920.94 MWD+IFR2+HDS+MS (7) 13,303.0 62.91 126.14 3,832.1 3,785.7 -5,822.8 9,858.9 5,951,572.3 388,053.9 3.9 10,945.63 MWD+IFR2+HDS+MS (7) 13,333.0 61.96 125.41 3,846.0 3,799.6 -5,838.3 9,880.5 5,951,556.4 388,075.2 3.8 10,970.24 MWD+IFR2+HDS+MS (7) 13,363.0 61.22 125.10 3,860.3 3,813.9 -5,853.6 9,902.1 5,951,540.9 388,096.5 2.6 10,994.74 MWD+IFR2+HDS+MS (7) 13,393.0 60.45 124.94 3,874.9 3,828.5 -5,868.6 9,923.5 5,951,525.5 388,117.7 2.6 11,019.11 MWD+IFR2+HDS+MS (7) 13,423.0 59.68 124.78 3,889.9 3,843.5 -5,883.5 9,944.8 5,951,510.3 388,138.8 2.6 11,043.32 MWD+IFR2+HDS+MS (7) 13,453.0 58.71 124.63 3,905.2 3,858.8 -5,898.1 9,966.0 5,951,495.3 388,159.7 3.3 11,067.35 MWD+IFR2+HDS+MS (7) 13,483.0 57.84 124.47 3,921.0 3,874.6 -5,912.6 9,987.0 5,951,480.5 388,180.5 2.9 11,091.16 MWD+IFR2+HDS+MS (7) 13,513.0 56.97 124.32 3,937.2 3,890.8 -5,926.9 10,007.9 5,951,465.9 388,201.1 2.9 11,114.77 MWD+IFR2+HDS+MS (7) 13,543.0 56.03 124.22 3,953.7 3,907.3 -5,941.0 10,028.6 5,951,451.4 388,221.6 3.1 11,138.16 MWD+IFR2+HDS+MS (7) 13,573.0 55.37 124.19 3,970.6 3,924.2 -5,954.9 10,049.1 5,951,437.2 388,241.8 2.2 11,161.34 MWD+IFR2+HDS+MS (7) 13,603.0 54.81 124.17 3,987.8 3,941.4 -5,968.7 10,069.4 5,951,423.0 388,262.0 1.9 11,184.36 MWD+IFR2+HDS+MS (7) 13,633.0 54.46 124.05 4,005.2 3,958.8 -5,982.4 10,089.7 5,951,409.0 388,282.0 1.2 11,207.26 MWD+IFR2+HDS+MS (7) 13,663.0 54.59 123.75 4,022.6 3,976.2 -5,996.1 10,109.9 5,951,395.0 388,302.0 0.9 11,230.16 MWD+IFR2+HDS+MS (7) 13,693.0 54.58 123.45 4,040.0 3,993.6 -6,009.6 10,130.3 5,951,381.2 388,322.2 0.8 11,253.11 MWD+IFR2+HDS+MS (7) 13,723.0 54.51 123.21 4,057.4 4,011.0 -6,023.0 10,150.7 5,951,367.4 388,342.4 0.7 11,276.10 MWD+IFR2+HDS+MS (7) 13,753.0 54.67 123.18 4,074.8 4,028.4 -6,036.4 10,171.2 5,951,353.7 388,362.6 0.5 11,299.12 MWD+IFR2+HDS+MS (7) 13,783.0 54.62 123.18 4,092.1 4,045.7 -6,049.8 10,191.7 5,951,340.0 388,382.9 0.2 11,322.16 MWD+IFR2+HDS+MS (7) 13,813.0 54.53 123.16 4,109.5 4,063.1 -6,063.2 10,212.1 5,951,326.3 388,403.1 0.3 11,345.18 MWD+IFR2+HDS+MS (7) 13,843.0 54.63 123.09 4,126.9 4,080.5 -6,076.5 10,232.6 5,951,312.6 388,423.4 0.4 11,368.21 MWD+IFR2+HDS+MS (7) 13,873.0 54.62 123.02 4,144.3 4,097.9 -6,089.9 10,253.1 5,951,298.9 388,443.7 0.2 11,391.26 MWD+IFR2+HDS+MS (7) 13,903.0 54.57 122.95 4,161.6 4,115.2 -6,103.2 10,273.6 5,951,285.3 388,463.9 0.3 11,414.31 MWD+IFR2+HDS+MS (7) 13,933.0 54.61 122.93 4,179.0 4,132.6 -6,116.5 10,294.1 5,951,271.7 388,484.2 0.1 11,437.36 MWD+IFR2+HDS+MS (7) 13,963.0 54.60 122.93 4,196.4 4,150.0 -6,129.8 10,314.7 5,951,258.0 388,504.6 0.0 11,460.43 MWD+IFR2+HDS+MS (7) 13,993.0 54.51 122.93 4,213.8 4,167.4 -6,143.1 10,335.2 5,951,244.4 388,524.8 0.3 11,483.47 MWD+IFR2+HDS+MS (7) 14,023.0 54.46 122.88 4,231.2 4,184.8 -6,156.3 10,355.7 5,951,230.8 388,545.1 0.2 11,506.51 MWD+IFR2+HDS+MS (7) 14,053.0 54.56 122.82 4,248.6 4,202.2 -6,169.6 10,376.2 5,951,217.3 388,565.4 0.4 11,529.55 MWD+IFR2+HDS+MS (7) 14,083.0 54.55 122.75 4,266.0 4,219.6 -6,182.8 10,396.7 5,951,203.7 388,585.8 0.2 11,552.62 MWD+IFR2+HDS+MS (7) 14,113.0 54.65 122.65 4,283.4 4,237.0 -6,196.0 10,417.3 5,951,190.1 388,606.1 0.4 11,575.71 MWD+IFR2+HDS+MS (7) 14,143.0 54.69 122.53 4,300.8 4,254.4 -6,209.2 1Q437.9 5,951,176.6 388,626.5 0.4 11,598.84 MWD+IFR2+HDS+MS (7) 1212312019 12:11.38PM Page 13 COMPASS 5000.14 Build 85H ConocoPhillips Definitive Survey Report Company: NADConversion Local Co-ordinate Reference: Well CD4-594 Project: North Alaska ASP4 TVD Reference: CD4-594 Actual @ 46.4usft Site: CD4 Nanuq Pad MD Reference: CD4-594 Actual @ 46.4usft Well: CD4-594 North Reference: True Wellbore: CD4-594PH1 Survey Calculation Method: Minimum Curvature Design: CD4-594PH1 Database: EDT 14 Alaska Production Survey Map Map Vertical MD Inc Azi TVD TVDSS +N/-S +El-W Northing Easting DLS Section (usft) (°) (°) (usft) (usft) (usft) (usft) (ft) (ft) (°/100-) (ft) Survey Tool Name 14,173.0 54.57 122.40 4,318.1 4,271.7 -6,222.3 10,458.6 5,951,163.2 388,646.9 0.5 11,621.98 MWD+IFR2+HDS+MS (7) 14,203.0 53.75 122.34 4,335.7 4,289.3 -6,235.4 10,479.1 5,951,149.8 388,667.3 2.7 11,644.99 MWD+IFR2+HDS+MS (7) 14,233.0 52.66 122.37 4,353.7 4,307.3 -6,248.2 10,499.4 5,951,136.6 388,687.3 3.6 11,667.72 MWD+IFR2+HDS+MS (7) 14,263.0 51.83 122.41 4,372.0 4,325.6 -6,260.9 10,519.5 5,951,123.6 388,707.2 2.8 11,690.16 MWD+IFR2+HDS+MS (7) 14,293.0 50.77 122.44 4,390.8 4,344.4 -6,273.5 10,539.2 5,951,110.7 388,726.7 3.5 11,712.31 MWD+IFR2+HDS+MS (7) 14,323.0 49.36 122.47 4,410.0 4,363.6 -6,285.8 10,558.6 5,951,098.1 388,745.9 4.7 11,734.06 MWD+IFR2+HDS+MS (7) 14,353.0 48.03 122.50 4,429.9 4,383.5 -6,29T9 10,577.6 5,951,085.7 388,764.7 4.4 11,755.37 MWD+IFR2+HDS+MS (7) 14,383.0 47.01 122.53 4,450.1 4,403.7 -6,309.8 10,596.3 5,951,073.5 388,783.2 3.4 11,776.29 MWD+IFR2+HDS+MS (7) 14,413.0 45.94 122.57 4,470.8 4,424.4 -6,321.5 10,614.6 5,951,061.5 388,801.3 3.6 11,796.85 MWD+IFR2+HDS+MS (7) 14,443.0 44.88 122.60 4,491.8 4,445.4 -6,333.0 10,632.6 5,951,049.7 388,819.2 3.5 11,817.04 MWD+IFR2+HDS+MS (7) 14,473.0 43.74 122.67 4,513.3 4,466.9 -6,344.3 10,650.3 5,951,038.1 388,836.6 3.8 11,836.84 MWD+IFR2+HDS+MS (7) 14,503.0 42.64 122.93 4,535.2 4,488.8 -6,355.4 10,667.5 5,951,026.7 388,853.7 3.7 11,856.22 MWD+IFR2+HDS+MS (7) 14,533.0 41.60 123.22 4,557.4 4,511.0 -6,366.4 10,684.4 5,951,015.5 388,870.4 3.5 11,875.17 MWD+IFR2+HDS+MS (7) 14,563.0 40.64 123.53 4,580.0 4,533.6 -6,377.3 10,700.9 5,951,004.3 388,886.7 3.3 11,893.73 MWD+IFR2+HDS+MS (7) 14,593.0 39.65 124.01 4,603.0 4,556.6 -6,388.0 10,716.9 5,950,993.3 388,902.6 3.5 11,911.87 MWD+IFR2+HDS+MS (7) 14,623.0 38.56 124.54 4,626.2 4,579.8 -6,398.7 10,732.6 5,950,982.4 388,918.0 3.8 11,929.56 MWD+IFR2+HDS+MS (7) 14,653.0 37.60 125.08 4,649.8 4,603.4 -6,409.2 10,747.8 5,950,971.6 388,933.0 3.4 11,946.80 MWD+IFR2+HDS+MS (7) 14,662.0 37.34 125.25 4,657.0 4,610.6 -6,412.4 10,752.3 5,950,968.4 388,937.5 3.1 11,951.91 MWD+IFR2+HDS+MS (7) 14,747.0 37.34 125.25 4,724.6 4,678.2 -6,442.2 10,794.4 5,950,938.0 388,979.1 0.0 11,999.77 PROJECTED toTD 31/2" Pipe 12/23/2019 12:11:38PM Page 14 COMPASS 5000.14 Build 85H operations Summary (with Timelog Lapths) CD4-594 Rig: DOYON 141 Job: DRILLING ORIGINAL Time Log Start Depth Start Time End Time our (hr) Phase Op Code Activity Code Time P-T-X Operation (ftKB) End Depth (ftKB) 9/30/2019 9/30/2019 6.00 MIRU MOVE RURD P Continue weld on shakers, painting, 105.0 105.0 14:00 20:00 working on drawworks, testing moving system working in pits. 9/30/2019 10/1/2019 6.00 MIRU MOVE RURD P weld shaker trough, clean out pits. 105.0 105.0 20.00 02:00 10/1/2019 10/1/2019 2.00 MIRU MOVE MOB P Rig down and move, motors, pits, pipe 105.0 105.0 02:00 04:00 shed T/ staging area 10/1/2019 10/1/2019 10.00 MIRU MOVE RURD P Rig up And Work on the rig 105.0 105.0 04:00 14:00 Aceptance List.Set the Safe Shack,Site control Shack,And the Parking Bull rail. 10/1/2019 10/1/2019 9.00 MIRU MOVE MOB P Set The Sub over the Well.the rig is 105.0 105.0 00:00 09:00 center over the conductor pipe, and is Level.Witnessed By The Drilling Supervisor: Geoff Connor..Set the Mud pits.pump room,Motor package and the Boiler Package.. 10/1/2019 10/1/2019 1.50 MIRU MOVE MOB P Set Herculite & set the rock washer 105.0 105.0 09:00 10:30 10/1/2019 10/1/2019 1.50 MIRU MOVE MOB P set the mats for the pipe shed and set 105.0 105.0 10:30 12:00 the pipe shed. 10/1/2019 10/1/2019 9.00 MIRU MOVE RURD P Rig up And Work on the rig 105.0 105.0 12:00 21:00 Aceptance List.Set the Safe Shack,Site control Shack,And the Parking Bull rail. 10/1/2019 10/2/2019 3.00 SURFAC MOVE RURD P Rig accepted at 21:00. 105.0 105.0 21:00 00:00 Continue to load the pipe Shed with all of the directional tools,and 100 JTS of 5 7/8" Drill pipe. 10/2/2019 10/2/2019 2.00 SURFAC MOVE RURD P Load Pipe In the Pipe Shed, and 105.0 105.0 00:00 02:00 Perform the Derrick Inspection. 10/2/2019 10/2/2019 1.00 SURFAC MOVE NUND P Install new air boots for the 105.0 105.0 02:00 03:00 Riser,Nipple up the riser.And Secure the Surface Riser & Hydrill 10/2/2019 10/2/2019 1.50 SURFAC MOVE SVRG P service the rig. 105.0 105.0 03:00 04:30 10/2/2019 10/2/2019 1.50 SURFAC MOVE RURD P Install the Mouse holes, 105.0 105.0 04:30 06:00 10/2/2019 10/2/2019 3.50 SURFAC MOVE RURD P Fill the pits with spud mud,change out 105.0 105.0 06:00 09:30 the skate wireline. 10/2/2019 10/2/2019 2.50 SURFAC MOVE RURD P Switch the rig over to line Power, 105.0 105.0 09:30 12:00 10/2/2019 10/2/2019 4.50 SURFAC MOVE RGRP T Change out the Cable on the Pipe 105.0 105.0 12:00 16:30 Skate. 10/2/2019 10/2/2019 5.00 SURFAC MOVE PULD P Pick up 99 jts of 5 7/8" D.P. in the 105.0 105.0 16:30 21:30 mouse and stand back in the Derrick. 10/2/2019 10/3/2019 2.50 SURFAC MOVE PULD P Load the HWDP in the pipe shed and 105.0 105.0 21:30 00:00 strap and pick up the same. 10/3/2019 10/3/2019 0.50 SURFAC MOVE PULD P P/U 17 JTS of 5 7/8" HWDP 1 5.0 105.0 00:00 00:30 10/3/2019 10/3/2019 1.50 SURFAC MOVE BHAH P PJSM, M/U the clean out BHA 105.0 105.0 00:30 02:00 10/3/2019 10/3/2019 0.50 SURFAC MOVE SEQP P Fill The Conductor Pipe With Spud 105.0 105.0 02:00 02:30 Mud, And test the Mud Pump,The Mud Line,And the Top drive to 3500 psi for 10 Mins. 10/3/2019 10/3/2019 2.50 SURFAC DRILL DRLG P Drib the Rat hole F/105' to T/221' GPM 105.0 221.0 =550 PSI=450, RPM= 60 WOB 6-8K 02:30 05:00 10/3/2019 10/3/2019 1.00 SURFAC DRILL TRIP P POOH F/221' to Surface. to P/U the 221.0 221.0 05:00 06:00 directional Assy. 10/3/2019 10/3/2019 2.00 SURFAC DRILL BHAH P Pick up the Directional Bottom hole 221.0 221.0 06:00 08:00 Assy.& TIH. Page 1/52 Report Printed: 1/9/2020 t..perations Summary (with Timelog uepths) C D4-594 46 Rig: DOYON 141 Job: DRILLING ORIGINAL Time Log Start Depth Start Time End Time Dur (hr) Phase Op Code Activity Code Time P-T-X Operation (ftKB) End Depth (ftKB) 10/3/2019 10/3/2019 6.00 SURFAC DRILL DDRL P TO FIX: 221.0 08:00 14:00 Drlg The Surfacehole F/221' to 1,112' P/U WT=80K, S/O WT= 74K, ROT WT=75 K, TQ ON BTTM 2-5K, TO Off=O FLOW OUT=80%, WOB=8/10K, RPM=60, GPM=650, TOTAL SPM=155, PSI on BTTM=1040. PSI OFF BTTM=850, ADT=3.43 ART= .078 AST=1.21 TOTAL BIT HRS= TOTAL JAR HRS=. 10/3/2019 10/3/2019 6.00 SURFAC DRILL DDRL P TO FIX: 221.0 14:00 20:00 Drlg The Surfacehole F/221' to 1,112' P/U WT=80K, S/O WT= 74K, ROT WT=75 K, TQ ON BTTM 2-5K, TQ Off=O FLOW OUT=80%, WOB=8/10K, RPM=60, GPM=650, TOTAL SPM=155, PSI on BTTM=1040. PSI OFF BTTM=850, ADT=3.43 ART= .078 AST=1.21 TOTAL BIT HRS= TOTAL JAR HRS=. 10/3/2019 10/3/2019 2.00 SURFAC DRILL DDRL P TO FIX: 221.0 1,112.0 20:00 22:00 Drlg The Surfacehole F/221'to 1,112' P/U WT=80K, S/O WT= 74K, ROT WT=75 K, TO ON BTTM 2-5K, TO Off=O FLOW OUT=80%, W0B=8/10K, RPM=60, GPM=650, TOTAL SPM=155, PSI on BTTM=1040. PSI OFF BTTM=850, ADT=3.43 ART= .078 AST=1.21 TOTAL BIT HRS= TOTAL JAR HRS=. 10/3/2019 10/4/2019 2.00 SURFAC DRILL SRVY T Wait on Gyro and Schlumberger,to 1,112.0 1,112.0 22:00 MOO Figure out why the Gyro tools & the schlumberger tools were giving different Surveys 10/4/2019 10/4/2019 2.50 SURFAC DRILL SRVY T Wait on Gyro and Schlumberger,to 1,112.0 1,112.0 00:00 02:30 Figure out why the Gyro tools & the schlumberger tools were giving different Surveys 10/4/2019 10/4/2019 3.50 SURFAC DRILL DDRL P Drlg The Surface hole F/1,112'to 1,112.0 02:30 06:00 1,300' P/U WT=94K, S/O WT= 87K, ROT WT=90 K, TO ON BTTM 3-4K, TQ Off=1-2K FLOW OUT=36%, WOB=22K, RPM=40, GPM=620, TOTAL SPM=150, PSI ON BTTM=1000. PSI OFF BTTM=840, ADT=1.35 ART= 0.61 AST=1.28 TOTAL BIT HRS= 8.12 TOTAL JAR HRS= 8.12 10/4/2019 10/4/2019 4.50 SURFAC DRILL DDRL P Drlg The Surface hole F/1,300'to 1,112.0 1,611.0 06:00 10:30 1,611' P/U WT=97K, S/O WT= 90K, ROT WT=94 K, TQ ON BTTM 2-5K, TQ Off=1-2K FLOW OUT=32%, WOB=24K, RPM=40, GPM=630, TOTAL SPM=150, PSI ON BTTM=1140. PSI OFF BTTM=880, ADT=2.5 ART= .077 AST=1.28 TOTAL BIT HRS= 10.25 TOTAL JAR HRS=.10.25 10/4/2019 10/4/2019 6.00 SURFAC DRILL RGRP T Trouble shoot Doyon's Top Drive,They 1,611.0 1,611.0 10:30 16:30 Had to Change out a Plug on Top Drive Hyd Motor. Page 2/52 Report Printed: 1/9/2020 operations Summary (with Timelog uapths) C D4-594 Rig: DOYON 141 Job: DRILLING ORIGINAL Time Log Start Depth StartTime End Time Dur (hr) Phase Op Code Activity Code Time P-T-X Operation (ftKB) End Depth (ftKB) 10/4/2019 10/4/2019 6.00 SURFAC DRILL DDRL P Drlg The Surfacehole F/1,611 'to 1,611.0 16:30 22:30 2,003' P/U WT=106K, S/O WT= 87K, ROT WT=100 K, TQ ON BTTM 4-6 K, TQ Off=3-4K FLOW OUT=34%, WOB=26K, RPM=40, GPM=650, TOTAL SPM=154, PSI ON BTTM=1200. PSI OFF BTTM=960 10/4/2019 10/5/2019 1.50 SURFAC DRILL DDRL P Drlg The Surfacehole F/2,003 'to 1,611.0 2,300.0 22:30 00:00 2,080' P/U WT=110K, S/O WT= 92K, ROT WT=100 K, TQ ON BTTM 4-6 K, TQ Off=3-4K FLOW OUT=36%, WOB=26K, RPM=40, GPM=650, TOTAL SPM=154, PSI ON BTTM=1200. PSI OFF BTTM=960, ADT=4.5 ART= 3.55 AST=3.55 TOTAL BIT HRS=15.75 TOTAL JAR HRS=.15.75 10/5/2019 10/5/2019 6.00 SURFAC DRILL DDRL P Drlg The Surface hole F/2,080' to 2,080.0 2,300.0 00:00 06:00 2,300' P/U WT=123K, S/O WT= 94K, ROT WT=100 K, TQ ON BTTM 5-8K, TO Off=3-4K FLOW OUT=35%, WOB=27K, RPM=40, GPM=650, TOTAL SPM=154, PSI ON BTTM =1200. PSI OFF BTTM=930, ADT=3.84 ART= 2.53 AST=1.31 TOTAL BIT HRS=19.61 TOTAL JAR HRS=19.61 10/5/2019 10/5/2019 6.00 SURFAC DRILL DDRL P Drlg The Surface hole F/2,300' to 2,300.0 2,495.0 06:00 12:00 2,495' P/U WT=120K, S/O WT= 96K, ROT WT=100 K, TQ ON BTTM 5-6K, TQ Off=3-5K FLOW OUT=35%, WOB=25K, RPM=40, GPM=650, TOTAL SPM=152, PSI ON BTTM=1120. PSI OFF BTTM=1000, ADT=4.59 ART= 2.85 AST=1.74 TOTAL BIT HRS=24.2 TOTAL JAR HRS= 24.2 10/5/2019 10/5/2019 6.00 SURFAC DRILL DDRL P Drlg The Surface hole F/2,495' to 2,495.0 2,675.0 12:00 18:00 2,675' P/U WT=123K, S/O WT= 94K, ROT WT=100 K, TQ ON BTTM 5-8K, TQ Off=2-5K FLOW OUT=35%, WOB=27K, RPM=40, GPM=650, TOTAL SPM=152, PSI ON BTTM=1200. PSI OFF BTTM=930, ADT=5.59 AST= 2.36 TOTAL BIT HRS=29.09 TOTAL JAR HRS=29.09 10/5/2019 10/5/2019 4.00 SURFAC DRILL DDRL P Drlg The Surface hole F/2,495' to TD 2,675.0 2,841.0 18:00 22:00 at 2,841' / 2382 TVD. P/U WT=120K, S/O WT= 94K, ROT WT=100 K, TO ON BTTM 5-8K, TQ Off=3-4K FLOW OUT=37%, WOB=30K, RPM=40, GPM=675, TOTAL SPM=160, PSI ON BTTM=1230. PSI OFF BTTM=1060, ADT=4.5 ART= 3.55 AST=3.55 TOTAL BIT HRS= 31.74 TOTAL JAR HRS= 31.74 10/5/2019 10/6/2019 2.00 SURFAC CASING CIRC P Circ 2 Bttms Up @ T.D. Pump a nut 2,841.0 2,841.0 22:00 00:00 plug sweep. 10/6/2019 10/6/2019 0.50 SURFAC CASING OWFF P Check the well for flow for 30 mins, No 2,841.0 2,841.0 00:00 00:30 flow Observed. 10/6/2019 10/6/2019 9.00 SURFAC CASING BKRM P BROOH F/2,841'to 1,332' MD, 2,841.0 2,841.0 00:30 09:30 RIW=95, GPM= 650, PSI =990, FLOW=37, RPM=40, TQ=2-6K 10/6/2019 10/6/2019 0.25 SURFAC CASING TRIP P POOH F/1,332' TO 1,238' WO 2,841.0 2,841.0 09:30 09:45 ROTATION. P/U. 95k,GPM=650, psi=860,Flow=37%. Page 3/52 Report Printed: 1/9/2020 ii,,perations Summary (with Timelog L apths) CD4-594 Rig: DOYON 141 Job: DRILLING ORIGINAL Time Log Start Depth Start Time End Time Dur (hr) Phase Op Code Activity Code Time P-T-X Operation (ftKB) End Depth (ftKB) 10/6/2019 10/6/2019 0.75 SURFAC CASING TRIP P POOH F/1238' to 769% PUW 100-120k 2,841.0 2,841.0 09:45 10:30 10/6/2019 10/6/2019 0.50 SURFAC CASING OWFF P Check the well for flow for 30 mins, No 2,841.0 2,841.0 10:30 11:00 flow Observed. 10/6/2019 10/6/2019 0.50 SURFAC CASING BHAH P Clean the rig Floor, PJSM for L/D the 2,841.0 2,841.0 11:00 11:30 bha. 10/6/2019 10/6/2019 4.50 SURFAC CASING BHAH P Pooh & L/D 9 Joints Of HWDP. F/769' 2,841.0 2,841.0 11:30 16:00 to T/Bit. LID BHA#1. 10/6/2019 10/6/2019 1.00 SURFAC CASING BHAH P Clean & Clear the rig Floor. 2,841.0 2,841.0 16:00 17:00 10/6/2019 10/6/2019 4.00 SURFAC CASING RURD P R/U Casing equipment. Perform the 2,841.0 2,841.0 17:00 21:00 dummy run with the hanger & Landing Joint. 10/6/2019 10/7/2019 3.00 SURFAC CASING PUTB P Hold A Pjsm. Run n 2,841.0 2,841.0 21:00 00:00 L-80, 68# PR/FT, Txp BTC Thread,Torque Connection's to 35 K, Filling On the Fly, Topping off Evey 10 Jts. 10/7/2019 10/7/2019 4.00 SURFAC CASING PUTB P Hold A Pjsm, Run the 13 3/8" 2,841.0 2,841.0 00:00 04:00 Casing,F/319' to To 1189', L-80, 68# PR/FT, Txp BTC Thread,Torque Connection's to 35 K, Filling On the Fly, Topping off Evey 10 Jts. 10/7/2019 10/7/2019 1.00 SURFAC CASING CIRC P Circ 1 Bttms up 2 joint of casing @ 2,841.0 2,841.0 04:00 05:00 1 1,350', Below the permafrost 10/7/2019 10/7/2019 3.75 SURFAC CASING PUTB P Hold A Pjsm, Run the 13 3/8" 2,841.0 2,841.0 05:00 08:45 Casing, F/1,189'to 1,861', L-80, 68# PR/FT, Txp BTC Thread,Torque Connection's to 35 K, Filling On the Fly, Topping off Evey 10 Jts. 10/7/2019 10/7/2019 1.25 SURFAC CASING PUTB T L/D Joint # 48 and Jt # 49, Due to 2,841.0 2,841.0 08:45 10:00 1 Galled threads 10/7/2019 10/7/2019 5.75 SURFAC CASING PUTB P Hold A Pjsm, Run the 13 3/8" 2,841.0 2,841.0 10:00 15:45 Casing, F/1,861'to 2,802', L-80, 68# PR/FT, Txp BTC Thread,Torque Connection's to 35 K, Filling On the Fly, Topping off Evey 10 Jts. 10/7/2019 10/7/2019 0.75 SURFAC CASING PUTB P PJSM, Make up the Hanger And 2,841.0 2,841.0 15:45 16:30 1 Landing Joint 10/7/2019 10/7/2019 1.50 SURFAC CASING CIRC P Wash to Bottom F/2802' to 2835', @ 4 2,841.0 2,841.0 16:30 18:00 bpm,150 PSI, P/U WT= 135K, S/O WT=130k, Reciprocate 10' up & down, Increase the pump rate to 8 BPM @ 230 psi, Circ & condition Mud. The total Centralizers ran 50, 10/7/2019 10/7/2019 3.50 SURFAC CEMENT CIRC P Circulate three bottoms to condition 2,841.0 2,841.0 18:00 21:30 mud while reciprocating with 10 ft. strokes. Rig up Schlumberger. P/U wt = 140k Slackoff wt = 109K, Increase pump rate to 8 BPM @ 230Psi, 10/7/2019 10/8/2019 2.50 SURFAC CEMENT CMNT P Hold A PJSM for the cement job, 2,841.0 2,841.0 21:30 00:00 Pump 5 BBLS water. Test lines to 3500 psi, Mix and pump100 bbls of 10.3 PPG Mud Push, Drop Bottom Plug,. Mix & pump 450 bbls of 11.0 ppg of LiteCrete Lead cement followed by 68 bbl of 15.8 ppg Class G Tail cement, Page 4/52 Report Printed: 1/9/2020 ,,perations Summary (with Timelog Lapths) C D4-594 s • s •' Rig: DOYON 141 Job: DRILLING ORIGINAL Time Log Start Depth Start Time End Time Dur (hr) Phase Op Code Activity Code Time P-T-X Operation (ftKB) End Depth (ftKB) 10/8/2019 10/8/2019 2.50 SURFAC CEMENT CMNT P Continue pumping 450 bbls 11 ppg 841.0 2,841.0 00:00 02:30 lead cmt, followed by 68 bbls 15.8 ppg ;l tail cement. pump 20 bbls fresh water, j� shut down and swap to rig pump. Pump @ 8 bpm @ 600 psi, slow pump i� to 3bpm # 3700 stks. bump plug @ C' 3917 stks, pressure up 500 psi over pumping PSi. Hold F/ 5 min. bleed off and check floats. CMT in place @ 04:42 hrs 10-8-19 No losses during the job. Got back 429 bbls of contaminated mud and cement. Had good cement in returns at the end of the job. 10/8/2019 10/8/2019 1.00 SURFAC CEMENT WWWH P Flush stack w/ black water, fuction 2,841.0 2,841.0 02:30 03:30 annular 10/8/2019 10/8/2019 2.50 SURFAC CEMENT RURD P R/D casing running Equip, remove 2,841.0 2,841.0 03:30 06:00 from rig floor. 10/8/2019 10/8/2019 1.00 SURFAC CEMENT RURD P Finish clearing rig floor oc csg running 2,841.0 2,841.0 06:00 07:00 tools. 10/8/2019 10/8/2019 1.00 SURFAC CEMENT WWWH P Drain stack, M/U stack washer, flush 2,841.0 2,841.0 07:00 08:00 annular preventer & riser with blackwater, function annular, L/D stack washer, BD top drive 10/8/2019 10/8/2019 1.00 SURFAC CEMENT RURD P PJSM, on N/D. L/D mouse hole, clean 2,841.0 2,841.0 08:00 09:00 out drip pan. off load cmt returns from pits # 1-2-5 & rock washer. 10/8/2019 10/8/2019 3.00 SURFAC WHDBOP NUND P Remover riser, clean cement out of 2,841.0 2,841.0 09:00 12:00 cellar with super sucker. remove annular & adapter spool, Start installlation of trough under shakers in pits. clean cement line demco valves, start cleaning mud pits & rock washer pits., load 225 jts 5 7/8 dp in shed. 10/8/2019 10/8/2019 1.75 SURFAC WHDBOP NUND P Remove annular & adapter F/ cellar, 2,841.0 2,841.0 12:00 13:45 continue cleaning cleaning mud pits & rockwasher 10/8/2019 10/8/2019 2.75 SURFAC WHDBOP NUND P N/U & orient csg/tbq head. set bops 2,841.0 2,841.0 13:45 16:30 on tubing head and install bolts. 10/8/2019 10/8/2019 0.50 SURFAC WHDBOP PRTS P Perform csg, head metal seal test 2,841.0 2,841.0 16:30 17:00 10/8/2019 10/9/2019 7.00 SURFAC WHDBOP NUND P Continue N/U stack and MPD systm. 2,841.0 2,841.0 17:00 00:00 10/9/2019 10/9/2019 6.00 SURFAC WHDBOP NUND P Continue N/U bop's & MPD Equip. 2,841.0 2,841.0 00:00 06:00 10/9/2019 10/9/2019 3.50 SURFAC WHDBOP NUND P Continue N/U bop's & MPD Equip. 2,841.0 2,841.0 06:00 09:30 Install double valve on lower Annulas, install koomey lines, on HCR valves, charge koomey bottles on TD, take on mud in pits 10/9/2019 10/9/2019 1.00 SURFAC WHDBOP NUND P Install trip nipple & and mouse hole. 2,841.0 2,841.0 09:30 10:30 10/9/2019 10/9/2019 3.75 SURFAC WHDBOP RURD P PJSM, P/U test jt. Fuction test BOP's, 2,97 2,841.0 10:30 14:15 perform shell test @ 250, low 3500 psi high. Page 5/52 Report Printed: 1/9/2020 %,,perations Summary (with Timelog Lapths) CD4-594 Rig: DOYON 141 Job: DRILLING ORIGINAL Time Log Start Depth Start Time End Time Dur (hr) Phase Op Code Activity Code Time P-T-X Operation (ftK6) End Depth (ftKB) 10/9/2019 10/10/2019 9.75 SURFAC WHDBOP BOPE P Test bop w/ 5 7/8 test jt. Test annular, 2,841.0 2,841.0 14:15 00:00 all choke valves, upper & lower IBOP valves, floor safety valves HCR choke & kill valves, Upper rams, Blind rams, Por @ 250 low & 3500 psi hi F/ 5 min ea. (� test Test PVT & gas alarms, Upper G5 rams Failed/ passed. Trip tank alarms Failed / pass on visual & audio, Perform Koomey draw down test. continue testing 10/10/2019 10/10/2019 3.50 SURFAC WHDBOP BOPE T Continue testing bop's, lower rams fail 2,841.0 2,841.0 00:00 03:30 test, open door on lower rams, inspect rams, rams ok, pull test plug & inspect, test plug pass visual insp. change out water valve on test pump. remove valves from test pump and flush out test pump. continue testing bop's. 10/10/2019 10/10/2019 1.00 SURFAC WHDBOP RURD P Rig down testing equip. 2,841.0 ' 2,841.0 03:30 04:30 CS 10/10/2019 10/10/2019 1.00 SURFAC DRILLOUT PRTS P PJSM, R/U and test 13 3/8 casing @ 2,841.0 2,841.0 04:30 05:30 2600 psi F/ 30 min. test good. 10/10/2019 10/10/2019 0.50 SURFAC DRILLOUT RURD P R/D testing equip, blow don lines. 2,841.0 2,841.0 05:30 06:00 10/10/2019 10/10/2019 1.00 SURFAC DRILLOUT MPDA P Remove trip nipple, & bell nipple, 2,841.0 2,841.0 06:00 07:00 install RCD plug f/ testing. Test RCD 13 5/8 clamp, 6" valve, 2" valve, plug valves @ 1000 psi F/ 5 min. 10/10/2019 10/10/2019 9.00 SURFAC DRILLOUT PULD P P/U and stand back60 stds of 5 7/8 2,841.0 2,841.0 07:00 16:00 DP in derrick, drift DP w/ 2.9" drift 10/10/2019 10/10/2019 1.00 SURFAC DRILLOUT MPDA P Remove RCD plug, fill MPD lines w/ 2,841.0 2,841.0 16:00 17:00 water F/ test, install trip nipple & bell nipple. 10/10/2019 10/10/2019 1.00 SURFAC DRILLOUT BHAH P Bring BHA subs T/ rig floor, prep F/ 2,841.0 2,841.0 17:00 18:00 picking up BHA, install wear bushing, ( wear bushing lenth 3.52, OD 13 1/8", ID 12 3/8 10/10/2019 10/10/2019 2.50 SURFAC DRILLOUT MPDA P Test MPD manifold 2,841.0 2,841.0 18:00 20:30 10/10/2019 10/10/2019 1.50 SURFAC DRILLOUT BHAH P PJSM, P/U BHA to 105' 2,841.0 2,841.0 20:30 22:00 10/10/2019 10/11/2019 2.00 SURFAC DRILLOUT BHAH P PJSM for loading radioactive source. 2,841.0 2,841.0 22:00 00:00 Continue & complete MU BHA. 10/11/2019 10/11/2019 2.00 SURFAC DRILLOUT PULD P TIH picking up single F/ shed F/ 432' 2,841.0 2,841.0 00:00 02:00 T/1850' 10/11/2019 10/11/2019 1.00 SURFAC DRILLOUT DHEQ P Cont. TIH F/ 1850' T/ 2607', drill pipe 2,841.0 2,841.0 02:00 03:00 & shallow test MWD @ 650 gpm, S/O 85 k. 10/11/2019 10/11/2019 0.50 SURFAC DRILLOUT COCF P Wash and ream F/ 2607 T/ 2746' W/ 2,841.0 2,841.0 03:00 03:30 650 gpm, spp 860, 40 rpm, 5/10 trq 10/11/2019 10/11/2019 0.50 SURFAC DRILLOUT DRLG P Tag FLT/CLR @ 2746', MD. drill out 2,841.0 2,861.0 03:30 04:00 float coller W/ 650 gpm, spp 830, 40 rpm, wob 12 k, 5/10 trq 10/11/2019 10/11/2019 2.00 SURFAC DRILLOUT DRLG P Cont. cleaning out cement F/ 2746 T/ 2,861.0 2,861.0 04:00 06:00 shoe @ 2827'. W/ 650 gpm, spp 830, 40 rpm, wob 12 k, 5/10 trq 10/11/2019 10/11/2019 1.00 SURFAC DRILLOUT DRLG P Drill out shoe, rat hole and 20' new 2,861.0 2,861.0 06:00 07:00 hole F/2827' T/ 2861' W/ 950 gpm, 1250 spp, 100 rpm, wob 5/10 k, 2/15 k trq 10/11/2019 10/11/2019 1.50 SURFAC DRILLOUT CIRC P Circulate & cond mud @ 2830' F/ FIT. 2,861.0 2,861.0 07:00 08:30 GPM 950, spp 1400, rpm 60, trq 4/6 k, P/u 100 k Page 6/52 Report Printed: 1/9/2020 ,perations Summary (with Timelog Lapths) CD4-594 Rig: DOYON 141 Job: DRILLING ORIGINAL Time Log Start Depth Start Time End Time our (hr) Phase Op Code Activity Code Time P-T-X Operation (ftKB) End Depth (ftKB) 10/11/2019 10/11/2019 0.50 SURFAC DRILLOUT RURD P Std back 1 std in derrick & R/U for FIT 2,861.0 2,861.0 08:30 09:00 test 10/11/2019 10/11/2019 1.50 SURFAC DRILLOUT FIT P P rform LOT test @ 14.8 ppg, for 10 2,861.0 2,861.0 09:00 10:30 min, 14 stks, 650 psi. 1.2 bbls return ikF/ bleed off. R/D testing equip & blow dwn. 10/11/2019 10/11/2019 0.75 INTRM1 DRILL DISP P Displace well T/ 11.0 ppg LSND mud, 2,861.0 2,861.0 10:30 11:15 pump 30 bbl hi vis weirhted sweep, followed w/ 420 bbls 11.0 ppg LSND mud, @ 900 gpm, 1300 spp, 90 rpm. 10/11/2019 10/11/2019 6.75 INTRM1 DRILL DDRL P Drill F/ 2861' T/ 3363' md, TVD 2568', 2,861.0 3,363.0 11:15 18:00 GPM 950, SPP 1460, RPM 150, ECD11.2, WOB 7/10 k, TRQ, on bott.4/6 k, P/U 105 K, S/O 98 k, RT wt 100 k. 10/11/2019 10/12/2019 6.00 INTRM1 DRILL DDRL P Drill F/ 3363' T/ 3888 ' md, 2647 TVD 3,363.0 3,888.0 18:00 00:00 ', GPM 916, SPP 1496, RPM 120, ECD 11.79, WOB 6 k, TRQ, on bott.6 k, P/U 115 K, S/O 99 k, RT wt 100 k. ADT 4.23 Bit HRS = 9.23 Jar HRS = 41 10/12/2019 10/12/2019 6.00 INTRM1 DRILL DDRL P Drill F/ 3888 ' T/ 4444' md, 2715' TVD 3,888.0 4,444.0 00:00 06:00 ', GPM 907, SPP 1590, RPM 150, ECD 11.7, WOB 14/18 k, TRQ, on bott.6/10 k, TRQ off 3/10 K, P/U 110 K, S/O 90 k, RT wt 98 k. 10/12/2019 10/12/2019 2.75 INTRM1 DRILL DDRL P Drill F/ 4444' T/ 4720' md, 2745' TVD', 4,444.0 4,720.0 06:00 08:45 GPM 912, SPP 1720, SPP off bot. 1690, SPM 216, RPM 180, WOB 8/10 k, TRQ, on bott.6/10 k, TRQ off 4 K, P/U 105 K, S/O 87 k, RT wt 93 k. Pump 30 bbl 14.0 ppg sweep @ 4510' 10/12/2019 10/12/2019 3.25 INTRM1 DRILL DDRL P Drill F/ 4720' T/ 4958' md, 2768' TVD ', 4,720.0 4,958.0 08:45 12:00 GPM 912, SPP 1830, SPP off bot. 1800, SPM 216, RPM 180, WOB 15/20 k, TRQ, on bott.6/10 k, TRQ off 5 K, P/U 105 K, S/O 95 k, RT wt 93 k. Pump Lo vis sweep @ 4910' - ADT 4.53 hrs, Bit HRS 18.04, Jar HRS 49.82 10/12/2019 10/12/2019 2.50 INTRM1 DRILL OTHR T Flow line plugged off with clay, Clear 4,958.0 4,958.0 12:00 14:30 clay F/ Flow line, work pipe @ 10 RPK W/ no flow while cleaning flow line 10/12/2019 10/12/2019 2.25 INTRM1 DRILL CIRC T Stage pumps up T/ 912 GPM, Circe 2 4,958.0 4,958.0 14:30 16:45 bottoms up @ 912 GPM, SSP 1750, RPM 150. 10/12/2019 10/12/2019 1.25 INTRM1 DRILL DDRL P Drill F/ 4958' T/ 4995 md, 2778' TVD 4,958.0 4,995.0 16:45 18.00 ', GPM 912, SPP 1830, SPP off bot. 1740, SPM 216, Flow 56%, RPM 150, WOB 5 / 8 k, TRQ, on bott.6/10 k, TRQ off 5 K, P/U 108 K, S/O 91 k, RT wt 100 k. 10/12/2019 10/13/2019 6.00 INTRM1 DRILL DDRL P Drill F/ 4495 T/5314' md, 2817' TVD', 4,995.0 5,314.0 18:00 00:00 GPM 916, SPP 1720, SPP off bot. 1700, SPM 216, Flow 57%, RPM 150, WOB 15 k, TRQ, on bott.10 k, TRQ off 7 K, P/U 111 K, S/O 92 k, RT wt 100 k. ADT 4.68 hr Total Bit HRS 23.54, Jar HRS 55.32 10/13/2019 10/13/2019 6.00 INTRM1 DRILL DDRL P Drill F/5314' T/ 5570' md, 2849' TVD', 5,314.0 5,570.0 00:00 06:00 GPM 916, SPP 1720, SPP off bot. 1700, SPM 216, Flow 57%, RPM 150, WOB 15 k, TRQ, on bott.10 k, TRQ off 7 K, P/U 111 K, S/O 92 k, RT wt 100 k. Page 7/52 Report Printed: 1/9/2020 operations Summary (with Timelog L.epths) CD4-594 Rig: DOYON 141 Job: DRILLING ORIGINAL Time Log Start Depth Start Time End Time Dur (hr) Phase Op Code Activity Code Time P-T-X Operation (ftKB) End Depth (ftKB) 10/13/2019 10/13/2019 6.00 INTRM1 DRILL DDRL P Drill F/5570' T/ 5915 md, 2884' TVD', 5,570.0 5,915.0 06:00 12:00 GPM 916, SPP 1720, SPP off bot. 1700, SPM 216, Flow 57%, RPM 150, WOB 15 k, TRQ, on bott.10 k, TRQ off 7 K, P/U 111 K, S/O 92 k, RT wt 100 k. 10/13/2019 10/13/2019 1.00 INTRM1 DRILL RGRP T Circ. 1.5 bottoms up @ 660 gpm, 156 5,915.0 5,915.0 12:00 13:00 spm, 1110 SPP while repairing electrical problem on shale shaker. 10/13/2019 10/13/2019 5.00 INTRM1 DRILL DDRL P Drill F/5915 T/ 6240' md, 2927' TVD', 5,915.0 6,240.0 13:00 18:00 GPM 920, SPP 1930, SPP off bot. 19200, SPM 216, Flow 57%, RPM 150, WOB 10 k, TRQ, on bott.9 k, TRQ off 7 K, P/U 115 K, S/O 94 k, RT wt 100 k. Pump 30 bbl Lo-vis NPM pill @ 5920.0 & 6177' 10/13/2019 10/13/2019 1.50 INTRM1 DRILL RGRP T Observe 500 psi PSI loss on stand 6,240.0 6,240.0 18:00 19:30 pipe after sending downlink. Trouble shoot surface equip. found bad suction valve spring, replace spring and 2 retainer bolts, circ. and work pipe W/ 450 gpm, 640 psi, 40 rpms. 10/13/2019 10/14/2019 4.50 INTRM1 DRILL DDRL P Drill F/ 6240' T/ 6455' md, 2928' TVD 6,240.0 6,455.0 19:30 00:00 ', GPM 920, SPP 1930, SPP off bot. 1920, SPM 216, Flow 58%, RPM 150, WOB 5/13 k, TRQ, on bott.8.5 k, TRQ off 6 K, P/U 120 K, S/O 92 k, RT wt 103 k. 10/14/2019 10/14/2019 2.50 INTRM1 DRILL DDRL P Drill F/ 6455' / 6578',md, 2968' TVD', 6,455.0 6,578.0 00:00 02:30 GPM 920, SPP 1930, SPP off bot. 2070, off bot SPP 2060, SPM 220, Flow 58%, RPM 150, WOB 5/10 k, TRQ, on bott.7/10 k, TRQ off 6 K, P/U 120 K, S/O 92 k, RT wt 103 k. 10/14/2019 10/14/2019 1.50 INTRM1 DRILL CIRC P Pump 30 bbl high-vis sweep (also 6,578.0 6,578.0 02:30 04:00 containing nut plug), followed W/ 275 bbl 11.0 ppg dilution @ 920 GPM, SPP 2070, RPM 150 TQ 6K, ECD 12.03 10/14/2019 10/14/2019 2.00 INTRM1 DRILL BKRM P BROOH F/ 6578' T/ 6104', RTW 98 k, 6,578.0 6,104.0 04:00 06:00 GPM 920, SPP 2070, Flow out 57%, RPM 150, TO 6 K, pump 30 bbl 11 ppg NPM sweep every other connection. 10/14/2019 10/14/2019 4.00 INTRM1 DRILL BKRM P BROOH F/6104' T/5250, @ 500 - 660 6,104.0 5,250.0 06:00 10:00 FPH,RTW 95 k, SPM 220, GPM 920, SPP 2070, Flow out 57%, RPM 150, ECD 12.07, TQ 6 K, pump 30 bbl 11 ppg NPM sweep every other connection. 10/14/2019 10/14/2019 2.00 INTRM1 DRILL BKRM P BROOH F/5250 T/ 4760', @ 300 - 350 5,250.0 4,760.0 10:00 12:00 FPH, Due to increase in cuttings, RTW 95 k, SPM 220, GPM 920, SPP 1980, Flow out 57%, RPM 150, ECD 12.12, TQ 6 K, pump 30 bbl 11 ppg NPM sweep every other connection. 10/14/2019 10/14/2019 6.00 INTRM1 DRILL BKRM P BROOH F 4760', T/ 3850.', @ 500 4,760.0 3,850.0 12:00 18:00 FPH, RTW 95 k, SPM 220, GPM 920, SPP 1750, Flow out 57%, RPM 150, ECD 11.57, TQ 3.7 K, pump 30 bbl 11 ppg NPM sweep every other connection. Tight spot F/3933' T/ 3910' wrk thru tight spot. Page 8/52 Report Printed: 1/9/2020 operations Summary (with Timelog uapths) CD4-594 Rig: DOYON 141 Job: DRILLING ORIGINAL Time Log Start Depth Start Time End Time Dur (hr) Phase Op Code Activity Code Time P-T-X Operation (ftKB) End Depth (ftKB) 10/14/2019 10/15/2019 6.00 INTRM1 DRILL BKRM P BROOH F 4760', T/ 2283', @ 300 - 3,850.0 2,283.0 18:00 00:00 350 FPH, Due to increase in cuttings, RTW 89 k, SPM 220, GPM 916, SPP 1500, Flow out 53%, RPM 80, ECD 11.33, TQ 3.7 K, pump 30 bbl 11 ppg NPM sweep every other connection. 10/15/2019 10/15/2019 3.50 INTRM1 DRILL BKRM P BROOH F/ 2283 T/ 1500', RTW 86 K, 2,283.0 1,500.0 00:00 03:30 GPM 920, SPP 1331, RPM 150, Trq 3/5 K, Flow 54%, ECD 11.28, continue pumping NPM sweeps every other std. 10/15/2019 10/15/2019 1.25 INTRM1 DRILL CIRC P Pump 30 bbl sweep, work pipe until 1,500.0 1,500.0 03:30 04:45 hole cleas up, W/ 920 GPM, 1331 SPP, 150 RPM. 10/15/2019 10/15/2019 0.75 INTRM1 DRILL OWFF P OWFF, well static, RIH F/ 1500' T/ 1,500.0 2,789.0 04:45 05:30 2789', P/U 98K, S/O 96K 10/15/2019 10/15/2019 2.50 INTRM1 DRILL CIRC P Circulate & condtion mud,450 gpm, 2,789.0 2,789.0 05:30 08:00 447 spp, slip & cut 57' drlg line, C/O dead man studs, service top drive & crown sheaves. 10/15/2019 10/15/2019 1.00 INTRM1 DRILL OTHR T Trouble shoot MWD caliper tool. 2,789.0 2,789.0 08:00 09:00 10/15/2019 10/15/2019 3.00 INTRM1 DRILL TRIP P TIH on elevators F/ 2789' T/ 4763' @ 2,789.0 4,763.0 09:00 12:00 1000 / 1500 FPH 10/15/2019 10/15/2019 0.50 INTRM1 DRILL TRIP P Fill pipe & test caliper @ 4763.0 4,763.0 4,763.0 12:00 12:30 10/15/2019 10/15/2019 2.50 INTRM1 DRILL TRIP P TIH on elevators F/ 4763' T/ 6481' @ 4,763.0 6,481.0 12:30 15:00 1000 / 1500 FPH 10/15/2019 10/15/2019 0.75 INTRM1 DRILL REAM P Wash & ream F/ 6481' T/ 6577', RPM 6,481.0 6,577.0 15:00 15:45 150, TRQ 4/6 K, GPM 920, Spp 2000, P/U 115 k, S/O 95 K, ROT WT 100 K, Flow 57%, ECD 11.7 10/15/2019 10/15/2019 2.25 INTRM1 DRILL DDRL P Drill F/ 6577" / 6690',md, 2982' TVD ', 6,577.0 6,690.0 15:45 18:00 GPM 920, SPP 2000, SPP off bot. 1980, SPM 218, Flow 57%, RPM 150, WOB 7/18 k, TRQ, on bott.7/14 k, TRQ off 5 K, P/U 116 K, S/O 95 k, RT wt 103 k. 10/15/2019 10/16/2019 6.00 INTRM1 DRILL DDRL P Drill F/ 6690' T/ 7146',md, 3040' TVD', 6,690.0 7,146.0 18:00 00:00 GPM 928, SPP 2200, SPP off bot. 2190, SPM 220, Flow 56%, RPM 146, WOB 18.5 k, TRQ, on bott.13/15 k, TRQ off 5/7 K, P/U 125 K, S/O 95 k, RT wt 104 k. 10/16/2019 10/16/2019 6.00 INTRM1 DRILL DDRL P Drill F/ 7146' T/ 7599', MD, 3092' TVD, 7,146.0 7,599.0 00:00 06:00 GPM 933, SPP 2240, SPP off bot. 2230, SPM 220, Flow 56%, RPM 150, WOB 8-12 k, TRQ, on bott.10/15 k, TRQ off 5/10 K, P/U 125 K, S/O 97 k, RT wt 108 k, max gas 175, ADT 4.7, Bit 53.4, Jars 85.18. SPR @ 7323' MD, 3062' TVD, MW 11.0 ppg, 02:30 hrs. #1@ 30 = 250; @ 40 = 290 #1@ 30 = 260; @ 40 = 300 10/16/2019 10/16/2019 3.25 INTRM1 DRILL DDRL P Drill F/ 7599' T/ 7750', MD, 3114' TVD, 7,599.0 7,750.0 06:00 09:15 GPM 920, SPP 2080, SPP off bot. 2060, SPM 218, Flow 56%, RPM 150, WOB 10-12 k, TQ on bott.10/15 k, TRQ off 5/7 K, P/U 124K, S/O 95k, RT wt 109 k, max gas 106, ADT 2.31, Bit 55.71, Jars 87.49. Page 9/52 Report Printed: 1/9/2020 operations Summary (with Timelog Lepths) CD4-594 Rig: DOYON 141 Job: DRILLING ORIGINAL Time Log Start Depth Start Time End Time Dur (hr) Phase Op Code Activity Code Time P-T-X Operation (ftKB) End Depth (ftKB) 10/16/2019 10/16/2019 1.25 INTRM1 DRILL CIRC T Rack back 1 stand. Circulate at 912 7,750.0 7,615.0 09:15 10:30 gpm, 1750 psi, 40 rpm. Observe pressure drop 400 psi & turbine rpm decreasing 1000 rpm. Check surface equipment, good. Treat aired up mud & still see decrease in both indicators. Decision made to TOH to looking for a washout in the drill string. 10/16/2019 10/16/2019 1.50 INTRM1 DRILL TRIP T TOH inspecting each joint looking for 7,615.0 6,858.0 10:30 12:00 washout f/ 7615' - 6858.' MD. 10/16/2019 10/16/2019 4.00 INTRM1 DRILL TRIP T Cont. TOH inspecting each joint 6,858.0 2,790.0 12:00 16:00 looking for washout f/ 6858' T2790.' MD. 10/16/2019 10/16/2019 0.50 INTRM1 DRILL TRIP T M/U Top drive, on std # 25, @ 2790', 2,790.0 2,790.0 16:00 16:30 pump @ 218 SPM, 920 gpm, 1124 spp, turbine rpm 1000 rpm, decrease, B/D top drive 10/16/2019 10/16/2019 1.50 INTRM1 DRILL TRIP T Cont. TOH inspecting each joint 2,790.0 1,088.0 16:30 18:00 looking for washout f/2790.' T / 1088' MD. p/u 80 k, s/o 80 k 10/16/2019 10/16/2019 2.50 INTRM1 DRILL TRIP T Cont. TOH inspecting each joint 1,088.0 156.0 18:00 20:30 looking for washout F/ 1088' T/ 156' MD. washout @ top of BHA XO f/ collers T/ HWDP. Replace XO. 10/16/2019 10/16/2019 1.00 INTRM1 DRILL DHEQ T Shallow test MWD tools, @ 605 gpm, 156.0 431.0 20:30 21:30 46 % flow discuss w/ town. dicission made to TIH. 10/16/2019 10/17/2019 2.50 INTRM1 DRILL TRIP T Trip in hole F/ 431'-4112' MD, fill pipe 413.0 4,112.0 21:30 00:00 every 2000', PU 65K, SO 65K. 10/17/2019 10/17/2019 2.00 INTRM1 DRILL TRIP T TIH f/ 4112' - 6101' MD, 70 fpm, PU 4,112.0 6,101.0 00:00 02:00 100K, SO 80K. 10/17/2019 10/17/2019 1.50 INTRM1 DRILL REAM T Begin to take weight tripping in, ream 6,101.0 6,578.0 02:00 03:30 from 6101'-6578' MD, 165 gpm, 300 psi, FO 21 %, 50 rpm, Tq 6K, PU 115K, SO 90K, ROT 102K. 10/17/2019 10/17/2019 1.00 INTRM1 DRILL TRIP T TIH f/ 6578'-7524' MD, PU 120K, SO 6,578.0 7,524.0 03:30 04:30 70K. 10/17/2019 10/17/2019 2.00 INTRM1 DRILL REAM T Ream f/ 7524'-7750' MD, 937 gpm, 7,524.0 7,750.0 04:30 06:30 2400 psi, 100 rpm, Tq 8-1 OK, FO 55%, ECD 11.86. Stage up pumps & rotary. Observe hole unload with a large amount of clay at surface. 10/17/2019 10/17/2019 5.50 INTRM1 DRILL DDRL P Drill F/ 7750' T/ 8087', MD, 3162' TVD, 7,750.0 8,087.0 06:30 12:00 GPM 920, SPP 2400, SPP off bot. 2380, SPM 218, Flow 56%, RPM 150, WOB 10-12 k, TQ on bott.10/15 k, TRQ off 5/7 K, P/U 102 K, S/O 99K, RT wt102K, max gas 352, ADT 4.34, Bit 60.05, Jars 91.83. SPR @ 7618' MD, 3099' TVD, MW 11.0 ppg, 07:00 hrs. #1@ 30 = 200; @ 40 = 240 #1@ 30 = 200; @ 40 = 240 10/17/2019 10/17/2019 6.00 INTRM1 DRILL DDRL P Drill F/ 8087' T/ 8467, MD, 3212' TVD, 8,087.0 8,467.0 12:00 18:00 GPM 920, SPP 2400, SPP off bot. 2380, SPM 218, Flow 56%, RPM 150, WOB 8 k, TQ on bott.12 k, TRQ off 7.5 K, P/U 135 K, S/O 96K, RT wtl1 OK, max gas 138, ADT 4.46, Bit 64.51, Jars 96.29 hrs. SPR @ 8277' MD, 3186' TVD, MW 11.0 ppg, 15:15 hrs. #1@ 30 = 220; @ 40 = 260 #1@ 30 = 200; @ 40 = 240 Page 10/52 Report Printed: 1/9/2020 operations Summary (with Timelog Lapths) C D4-594 Rig: DOYON 141 Job: DRILLING ORIGINAL Time Log Start Depth Start Time End Time Dur (hr) Phase Op Code Activity Code Time P-T-X Operation (ftKB) End Depth (ftKB) 10/17/2019 10/17/2019 5.00 INTRM1 DRILL DDRL P Drill F/ 8467.0 T/ 8854', MD, 3212" 8,467.0 8,854.0 18:00 23:00 TVD, GPM 937, SPP 2400, SPP off bot. 2380, SPM 218, Flow 56%, RPM 150, WOB 8 k, TO on bott.12/13 k, TRQ off7/8 K, P/U 1135 K, S/O 96K, RT wt11 OK, max gas 125, ADT 4.21, Bit 68.72, Jars 100.5. SPR @ 8846' MD, 3164' TVD, MW 11.0 ppg, 22:30 hrs. #1@ 30 = 260; @ 40 = 310 #1@ 30 = 270; @ 40 = 340 10/17/2019 10/18/2019 1.00 INTRM1 DRILL SVRG P Rig service, change out isolation valve 8,854.0 8,854.0 23:00 00:00 for mud pumps. 10/18/2019 10/18/2019 6.00 INTRM1 DRILL DDRL P Drill F/ 8854' T/9207', MD, 3310" 8,854.0 9,207.0 00:00 06:00 TVD, GPM 933, SPP 2435, SPP off bot. 2435, SPM 221, Flow 56%, RPM 150, WOB 7 /12 k, TQ on bott.10/15 k, TRQ off5/12 K, P/U 135 K, S/O 96K, RT wt114K, max gas 123, ADT 4.66, Bit 68.72.9, Jars 104.68 SPR @ 8846' MD, 3164' TVD, MW 11.0 ppg, 22:30 hrs. #1@ 30 = 260; @ 40 = 310 #2@ 30 = 270; @ 40 = 340 10/18/2019 10/18/2019 6.00 INTRM1 DRILL DDRL P Drill F//9207' T/ 9606', MD, 3362" 9,207.0 9,606.0 06:00 12:00 TVD, GPM 927, SPP 2450, SPP off bot. 2450, SPM 221, Flow 55%, RPM 150, WOB 7 /15 k, TO on bott.11/15 k, TRQ off 5/12 K, P/U 135 K, S/O 90K, RT wt118K, max gas 133, ADT 4.66, Bit hrs 77.56, Jars 109.34 SPR @ 9314' MD, 3322' TVD, MW 11.0 ppg, 10:00 hrs. #1@ 30 = 280; @ 40 = 320 #2@ 30 = 290; @ 40 = 310 10/18/2019 10/18/2019 6.00 INTRM1 DRILL DDRL P Drill F/ 9606 T/9926% MD, 3402" TVD, 9,606.0 9,926.0 12:00 18:00 GPM 933, SPP 2550, SPP off bot. 2550, SPM 221, Flow 53%, RPM 150, WOB 7 /15 k, TQ on bott.14 k, TRQ off 10.5 K, P/U 135 K, S/O 90K, RT wt11 OK, max gas 133, ADT 4.88, Bit hrs 82.44, Jars hrs 114.22 SPR @ 9314' MD, 3322' TVD, MW 11.0 ppg, 10:00 hrs. #1@ 30 = 280; @ 40 = 320 #2@ 30 = 290; @ 40 = 310 10/18/2019 10/19/2019 6.00 INTRM1 DRILL DDRL P Drill F/9926' T/ 10267', MD, 3346" 9,926.0 10,267.0 18:00 00:00 TVD, GPM 941, SPP 2560, SPP off bot. 2560, SPM 221, Flow 53%, RPM 150, WOB 10 k, TQ on bott.15 k, TRQ off 10.5 K, P/U 135 K, S/O 90 K, RT wt 118K, max gas 140, ADT 4.92, Bit hrs 87.36, Jars hrs 119.14 SPR @ 9314' MD, 3322' TVD, MW 11.0 ppg, 10:00 hrs. #1 @ 30 = 280; @ 40 =320 #2@ 30 = 290; @ 40 = 310 10/19/2019 10/19/2019 3.25 INTRMI CASING CIRC P Circulate & cond. mud / Dilution, W/ 10,267.0 10,267.0 00:00 03:15 941 gpm, 2600 spp, 56% flow, 150 rpm, 11 K torq, P/U 135, S/O 95, ROW 110K 10/19/2019 10/11/2019 0.50 INTRM1 CASING OWFF P Flow check well, well static, service 10,267.0 10,267.0 03:15 03:45 TD Page 11/52 Report Printed: 1/9/2020 t.,perations Summary (with Timelog uepths) C D4-594 Rig: DOYON 141 Job: DRILLING ORIGINAL Time Log Start Depth Start Time End Time Dur (hr) Phase Op Code Activity Code Time P-T-X Operation (ftKB) End Depth (ftKB) 10/19/2019 10/19/2019 2.25 INTRM1 CASING BKRM P BROOH F/ 10267 T/ 9300', at 675 10,267.0 9,300.0 03:45 06:00 FPH ROT 103, GPM 940, SPP 2197, flow 56%, RPM 150, TQ 9/11 K, ECD 11.9 Max Gas 69 10/19/2019 10/19/2019 6.00 INTRM1 CASING BKRM P BROOH F/ 9300' T/ 8090' at 675 FPH 9,300.0 8,090.0 06:00 12:00 ROT 103, GPM 940, SPP 2197, flow 56%, RPM 150, TQ 9/11 K, ECD 11.9 Max Gas 69 10/19/2019 10/19/2019 6.00 INTRM1 CASING BKRM P BROOH F/8090' T/ 6363, at 675 FPH 8,090.0 6,363.0 12:00 18:00 ROT 97, GPM 9037, SPP 2040, flow 53%, RPM 150, TQ 8 K, ECD 11.74, Max Gas 77 10/19/2019 10/19/2019 3.50 INTRM1 CASING BKRM P BROOH F/ 6360' T/ 5400', at 675 6,363.0 5,400.0 18:00 21:30 FPH ROT 97, GPM 9037, SPP 2040, flow 53%, RPM 150, TO 8 K, ECD 11.74, Max Gas 110 10/19/2019 10/20/2019 2.50 INTRM1 CASING OTHR T Observed spike in ECD'S, & increase 5,400.0 5,400.0 21:30 00:00 in cutting @ shakers, reduce pump rate, shut down due to flow line & riser packed off with clay. Clear flow line & riser of clay, reestablish circulation. 10/20/2019 10/20/2019 1.00 INTRM1 CASING CIRC T Cont. circulating, staging pump up T/ 5,400.0 5,400.0 00:00 01:00 full rate 920 gpm, 1900 SPP, 150 rpm, 54% flow, 7K trq, 11.55 ecd 10/20/2019 10/20/2019 5.00 INTRM1 CASING BKRM P BROOH F/ 5400 T/4508', at 675 FPH 5,400.0 4,508.0 01:00 06:00 W/ 920 gpm, 1790 spp, 57% flo, 150 rpm, 6 K trq, RTW 98 k, ECD 11.4 10/20/2019 10/20/2019 6.00 INTRM1 CASING BKRM P BROOH F/ 4508' T/ 3550.0, at 675 4,508.0 3,550.0 06:00 12:00 FPH W/ 920 gpm, 1740 spp, 57% flo, 150 rpm, 6 K trq, RTW 93 k, ECD 11.51 10/20/2019 10/20/2019 6.00 INTRM1 CASING BKRM P BROOH F/ 3550', T/2512' at 675 FPH 3,550.0 2,512.0 12:00 18:00 W/ 920 gpm, 1740 spp, 57% flo, 150 rpm, 6 K trq, RTW 93 k, ECD 11.51 10/20/2019 10/20/2019 3.00 INTRM1 CASING BKRM P BROOH F/2512' T/ 1500', at 675 FPH 2,512.0 1,500.0 18:00 21:00 W/ 920 gpm, 1420 spp, 57% flo, 140 rpm, 3/5 K trq, RTW 93 k, ECD 11.4 10/20/2019 10/20/2019 0.50 INTRM1 CASING CIRC P Pump sweep,Circulate 1,500.0 1,500.0 21:00 21:30 10/20/2019 10/20/2019 1.00 INTRM1 CASING OWFF P OWFF, F/ 30 min, well static, blow 1,500.0 1,500.0 21:30 22:30 down mud lines. 10/20/2019 10/20/2019 0.50 INTRM1 CASING SVRG P Service rig. 1,500.0 1,500.0 22:30 23:00 10/20/2019 10/21/2019 1.00 INTRM1 CASING TRIP P TOH on elevators F/ 1500' T/ 1038' 1,500.0 1,038.0 23:00 00:00 10/21/2019 10/21/2019 0.75 INTRM1 CASING TRIP P TOH f/ 1038'-431' MD. 1,038.0 431.0 00:00 00:45 10/21/2019 10/21/2019 0.25 INTRM1 CASING OWFF P Monitor well, static. 431.0 431.0 00:45 01:00 10/21/2019 10/21/2019 3.00 INTRM1 CASING BHAH P PJSM, STD/BK hwdp in drk, L/D BHa 431.0 0.0 01:00 04:00 10/21/2019 10/21/2019 1.00 INTRM1 CASING BHAH P Clean rig flr, remove BHA tools F/ floor 0.0 0.0 04:00 05:00 10/21/2019 10/21/2019 2.00 INTRM1 CASING WWWH P P/U stack washer & flush bop,s 0.0 0.0 05:00 07:00 10/21/2019 10/21/2019 1.25 INTRM1 CASING RURD P B/D Top Drive, P/u test jt. M/U W/R 0.0 0.0 07:00 08:15 1 I retreival tool & pull W/R. Page 12/52 Report Printed: 1/9/2020 operations Summary (with Timelog uepths) C D4-594 DOYON 141 Job: DRILLING ORIGINAL Time Log Start Depth Start Time End Time our (hr) Phase Op Code Activity Code Time P-T-X Operation (ftKB) End Depth (ftKB) 10/21/2019 10/21/2019 3,75 INTRM1 CASING BOPE P PJSM, Test BOPS, W/ 5 7/8 test jt. - 0.0 0.0 08:15 12:00 250 psi low, 3500 psi high, F/ 5min Ea. - test annular, demco kill, IBOP, valves 12, 13, 14, upper 3.5 X 6" rams, HCR kill, Main IBOP, valves 9, 11, 13 FOSV, HCR choke, lower rams, valves 4, 7, 5, 6, 10/21/2019 10/21/2019 2.50 INTRM1 CASING BOPE P Cont. T/ test BOP'S, Perform choke 0.0 0.0 12:00 14:30 draw down, W/ main choke T/ 2000 psi, perform Accumlator dray down, Start psi 3000 psi, pressure after closing 1900 psi, .43 sec @ 200 psi, nitrogemn bottle Average 1975 psi 10/21/2019 10/21/2019 0.75 INTRM1 CASING RURD P R/D test eqpt. B/D testing equip & 0.0 0.0 14:30 15:15 choke & kill 10/21/2019 10/21/2019 2.75 INTRM1 CASING RURD P PJSM, rig down scaffold, change out 0.0 0.0 15:15 18:00 upper rams T/ 9 5/8 solid body rams. 10/21/2019 10/21/2019 2.00 INTRM1 CASING BOPE P P/U 9.625 test jt, fill stack, test annular 0.0 0.0 18:00 20:00 & upper rams & FOSV, @ 250 low & 3500 psi high For 5 min ea. 10/21/2019 10/21/2019 0.50 INTRM1 CASING RURD P Rig down test, install 12.438 ID wear 0.0 0.0 20:00 20:30 1ring. 10/21/2019 10/22/2019 3.50 INTRM1 CASING RURD P R/U, GBR, remove circ. swivel F/ 0.0 0.0 20:30 00:00 V1117 ti Volant tool, and replace with torque turn sensor. change out 4' extenion bails T/ 6' bails 10/22/2019 10/22/2019 1.00 INTRM1 CASING RURD Install 6' bail extensions, set & secure 0.0 0.0 00:00 01:00 spiders in the rotary table. 10/22/2019 10/22/2019 3.25 INTRM1 CASING PUTB P PJSM, Make uo shoe track for 9-5/8". 0.0 607.0 01:00 04:15 40#, TN80-HS, TXP BTC liner. BakerLok each connection to the pin end of joint # 5. Torque turned to 27,670 ft/lbs. Two centralizers installed on the 1 st joint. One centralizer locked in the middle of #2- 4. Pump a liner volume & check floats, good. Continue running liner to 607' MD. Joints 1-9 are TN80-HS grade liner. The rest of the liner is L-80 grade. 10/22/2019 10/22/2019 2.00 INTRM1 CASING EQRP T Attempt to fill pipe & sealing cup would 607.0 607.0 04:15 06:15 not hold pressure. Change out to spare cup with same result. Mobilize cup from Doyon casing & install. Test good. 10/22/2019 10/22/2019 1.75 INTRM1 CASING PUTB P Continue running 9-5/8", 40#, L-80, 607.0 928.0 06:15 08:00 TXP BTC liner from 607'-928' MD. 10/22/2019 10/22/2019 0.75 INTRM1 CASING EQRP T Top drive broke out of XO to the CRT 928.0 928.0 08:00 08:45 while backing out of a joint of liner. Re- make connection 2X to 32K Tq. Clean & inspect threads & make up again to 32K Tq. Use rig tongs to break CRT bite on liner then back out. 10/22/2019 10/22/2019 3.25 INTRM1 CASING PUTB P Continue running 9-5/8", 40#, L-80, 928.0 2,197.0 08:45 12:00 TXP BTC liner from 928'-2197' MD, SO 93K. Fill on the fly & top off every 10 joints. Free floating centralizers installed to joint 49. 10/22/2019 10/22/2019 6.00 INTRM1 CASING PUTB P Continue running 9-5/8", 40#, L-80, 2,197.0 4,573.0 12:00 18:00 TXP BTC liner from 2,197' to 4,573' MD, SO 95K. Fill on the fly & top off every 10 joints. Page 13152 Report Printed: 1/9/2020 operations Summary (with Timelog L,epths) C D4-594 r • r' Rig: DOYON 141 Job: DRILLING ORIGINAL Time Log Start Depth Start Time End Time Dur (hr) Phase Op Code Activity Code Time P-T-X Operation (ftKB) End Depth (ftKB) 10/22/2019 10/23/2019 6.00 INTRM1 CASING PUTB P Continue running 9-5/8", 40#, L-80, 4,573.0 6,750.0 18:00 00:00 TXP BTC liner from 2,197' to 6,750' MD. Fill on the fly & top off every 10 joints. Circ @ 2 bpri psi,puw130k, sow 100k 10/23/2019 10/23/2019 3.00 INTRM1 CASING PUTB P Continue running 9-5/8", 40#, L-80, 6,750.0 7,570.0 00:00 03:00 TXP BTC liner from 6750' to 7570' MD, PU 135K, SO 97K. Total of 186 joints.Fill on the fly & top off every 10 joints. 10/23/2019 10/23/2019 1.50 INTRM1 CASING RURD P Blow down top drive, rig down CRT, 7,570.0 7,570.0 03:00 04:30 lay down bail extensions, PU power tongs, RU hydraulic lines for tongs. 10/23/2019 10/23/2019 1.00 INTRM1 CASING OTHR P Make up Baker 9-5/8" liner hanger / 7,570.0 7,605.0 04:30 05:30 packer as per BOT Rep. to 7605' MD. 10/23/2019 10/23/2019 0.50 INTRMI CASING WASH P Pick up 1 stand of 5-7/8" HWDP & 7,605.0 7,698.0 05:30 06:00 wash down to 7698' MD, PU 135K, SO 100K, 1 bpm, 270 psi, FO 2%. 10/23/2019 10/23/2019 4.00 INTRM1 CASING CIRC P Circulate a liner volume staging up the 7,698.0 7,698.0 06:00 10:00 pumps f/ 1-4 bpm, ICP 230 psi, FCP 270 psi. Obtain parameters PU 135K, SO 100K, ROT 127K, 12 rpm, Tq 13- 15 K. 10/23/2019 10/23/2019 2.00 INTRM1 CASING RUNL P Continue running 9-5/8", 40#, L-80, 7,698.0 8,159.0 10:00 12:00 TXP BTC liner on DP from 7698' to 8159' MD, SO 11 OK. Fill DP every 5 stands. 10/23/2019 10/23/2019 5.00 INTRM1 CASING RUNL P Continue running 9-5/8", 40#, L-80, 8,159.0 9,350.0 12:00 17:00 TXP BTC liner on DP from 8,159' To 9,350' MD, SO 110K. Fill DP every 5 stands. 10/23/2019 10/24/2019 7.00 INTRM1 CASING RUNL P Continue running 9-5/8", 40#, L-80, 9,350.0 10,080.0 17:00 00:00 TXP BTC liner on DP from 9,350' to 10,080' MD,TIH @ 8 Feet pr/min SO 11 OK. Fill DP every 5 stands. * Note AT 10,080' we Were runing the liner in the hole and started taking wt going down.we picked up and Run #2 mud pump @ 20 spm.2 bbls pr/min @ 340 psi.and wash to Bottom. 10/24/2019 10/24/2019 1.00 INTRM1 CASING RUNL P Set 25k down weight 2X @ 10,080', 10,080.0 10,240.0 00:00 01:00 wash down at 2 bpm, 390 psi, @ 7% flow, F/ 10,080' to 10,240' MD 15 to 20k Drag. 10/24/2019 10/24/2019 1.50 INTRM1 CASING HOSO P P/U Single jt of D.P. and Continue. 10,240.0 10,267.0 01:00 02:30 washing down F/10,240' to 10,267', set down 15 k on Bottom to Confirm it was Bottom, Space out with a 10' pup it. 10/24/2019 10/24/2019 7.00 INTRM1 CEMENT CIRC P Circ Bttms up Staging the pumps up 10,267.0 10,267.0 02:30 09:30 F/ 2 BPM to 6 BPM, Reciprocating the Drill String 30' and tagging Bottom Every 3RD Stroke. ICP-2BPM @ 350 PSI W/ 5% Flow. FCP @ 6 BPM, @ 400 PSI. @ 26% Flow. we didn't lose any mud while Circulating Bttms up. 10/24/2019 10/24/2019 1.00 INTRM1 CEMENT RURD P @ 10,267' Blow Down the top Drive & 10,267.0 10,267.0 09:30 10:30 P/U Cement swivel, And M/U Cement Line to the swivel. and Blow Air Thru the cement Lines. Page 14152 Report Printed: 1/9/2020 operations Summary (with Timelog uapths) C D4-594 Rig: DOYON 141 Job: DRILLING ORIGINAL Time Log Start Depth Start Time End Time our (hr) Phase Op Code Activity Code Time P-T-X Operation (ftKB) End Depth (ftKB) 10/24/2019 10/24/2019 1.25 INTRM1 CEMENT CIRC P Circ & Cond @ 6 BPM, 540 Psi. U/D 10,267.0 10,267.0 10:30 11:45 175k/142k W/ The pump on. U/D 180K/93K W/ No Pump. 10/24/2019 10/24/2019 0.25 INTRM1 CEMENT SFTY P PJSM W/ Schlumberger 10,267.0 10,267.0 11:45 12:00 Cementer's,Baker Hughes, And the Rig Crew. on the CMT Job. 10/24/2019 10/24/2019 0.25 INTRM1 CEMENT PRTS P Flood the Surface Lines With H2O & 10,267.0 10,267.0 12:00 12:15 Pressure test the cement lines to 4500 Psi. 10/24/2019 10/24/2019 3.25 INTRM1 CEMENT CMNT P Pump 60 BBLS of 13.0 PPG Mud 10,267.0 10,267.0 12:15 15:30 Push Pumped @ 4 BBLS PR/min, Drop the Bottom Dart, pump 157 BBLS OF 15.8 PPG of Class G Cement,Yield 1.16. Drop The Top Dart, Pump 10 BBLS of Fresh Water & Displace With 11 PPG LSND, The tea' Bottom Plug Hit W/ 460 BBLS Pumped, The top Plug Bumped W/ 604.2 BBLS Pumped.Pump 500 Psi 1 Over the Circulating Pressure of 830 V' Psi. Hold 1330 Psi on the Floats for 5 Mins. Bleed of & checkThe Floats. the Floats Held Good.@ 1532 HRS. 10/24/2019 10/24/2019 1.00 INTRM1 CEMENT PACK P Pressure up To 3000 Psi to set the 10,267.0 10,267.0 15:30 16:30 Liner Hanger, Set 60K down to Confirm that the Liner is Set Good. Pressure up to 4200 Psi with theTest Pump To Release Liner RNG Tool.Bleed The Pressure off. Pick up to Verify the release the release was Good. P/U 5 Feet To Dog Out, Slack off to the liner top, P/U & Rot @ 20 Rpm's W/3kTq,Slack Off 65K Down To Set the Liner Top Packer. 10/24/2019 10/24/2019 0.50 INTRM1 CEMENT PRTS P Close the Annular, Pressure test the 10,267.0 10,267.0 16:30 17:00 liner packer to 3000 Psi, test is Good. Bleed off the Pressure & blow Down the Kill line. 10/24/2019 10/24/2019 0.50 INTRM1 CEMENT RURD P Rig down the Cement line From the 10,267.0 10,267.0 17:00 17:30 Swivel,Open the IBOP's, Brake down the cement Hose. 10/24/2019 10/24/2019 0.25 INTRM1 CEMENT CIRC P Pressure up the drill string to 500 psi 10,267.0 2,662.0 17:30 17:45 and P/U Until The PSI dropped To confirm the string is out of the Liner top And to clean any Residual cement from the Liner top. 10/24/2019 10/24/2019 0.25 INTRM1 CEMENT CIRC P Circ Bttms Up @ 10 BPM to Clean 2,662.0 2,662.0 17:45 18:00 any Residual cement from the well Bore. 10/24/2019 10/24/2019 2.50 INTRM1 CEMENT RURD P Laydown Baker's Cement Manifold, 1jt 2,662.0 2,662.0 18:00 20:30 of D.P. & The Space out Pup Jt, Blow down the top Drive. And LayDown 5 More jts of 5.875" Drill pipe. 10/24/2019 10/24/2019 1.50 INTRM1 CEMENT PRTS P Rig up & fill surface Iines,Close the 2,662.0 2,662.0 20:30 22:00 Annular, Pressure Test & Chart the top of Packer,Test To 1000 PSI For 10 Mins.Test Held Good. It Took 4.8 bbls to Pressure up to1000 psi.and Bled Back4.8 bbls after the Test. 10/24/2019 10/25/2019 2.00 INTRM1 CEMENT SLPC P Slip & Cut 97' of Drilling Line & 2,662.0 2,662.0 22:00 00:00 Service the rig. 10/25/2019 10/25/2019 6.00 INTRM1 CEMENT PULD P TOH laying down 23 stands 5-7/8" DP 2,662.0 0.0 00:00 06:00 & 5 stands of HWDP from 2662' to surface. Page 15/52 Report Printed: 1/9/2020 %.perations Summary (with Timelog L apths) C D4-594 Rig: DOYON 141 Job: DRILLING ORIGINAL Time Log Start Depth Start Time End Time Dur (hr) Phase Op Code Activity Code Time P-T-X Operation (ftKB) End Depth (ftKB) 10/25/2019 10/25/2019 1.25 INTRM1 CEMENT BHAH P Lay down Baker running tool & 0.0 0.0 06:00 07:15 confirm on dog sub that packer set. 10/25/2019 10/25/2019 0.50 INTRM1 CEMENT RURD P Make up wear bushing tool & retrieve 0.0 0.0 07:15 07:45 wear bushing. Lay down the same. 10/25/2019 10/25/2019 1.00 INTRM1 CEMENT RURD P Pick up landing joint & make up 0.0 0.0 07:45 08:45 hanger. Perform dummy run & mark landing joint with hanger landed. 10/25/2019 10/25/2019 2.00 INTRM1 CEMENT RURD P Mobilize equipment to the rig floor. 0.0 0.0 08:45 10:45 Break out WE sub off of the CRT. Rig up liner running equipment. 10/25/2019 10/25/2019 0.25 INTRM1 CEMENT SFTY P PJSM for picking up & running 9.625" 0.0 0.0 10:45 11:00 liner tie back. 10/25/2019 10/25/2019 1.00 INTRM1 CEMENT PUTB P Pick up Baker bullet seal assembly 0.0 1910 11:00 12:00 with mule shoe & run 9-5/8", 40#, L- 80, TXP BTC liner to 193' MD. First 2 joints had centralizers locked in the middle of the joints. 10/25/2019 10/25/2019 5.50 INTRM1 CEMENT PUTB P Run the 9 5/8 TXP 40# Tie Back 193.0 2,574.0 12:00 17:30 string f/193' to 2,574' & space out as per Baker Rep. NO GO out 22.4' in on Jt# 65. DN=103. 10/25/2019 10/25/2019 0.50 INTRM1 CEMENT RURD P P/U & R/U GBR Power tongs, Simops 2,574.0 2,574.0 17:30 18:00 R/U & Test the Bullet seals. to 1000 Psi F/10 mins. 10/25/2019 10/25/2019 1.50 INTRM1 CEMENT HOSO P Laydown 3 JTS of 9 5/8" casing. 2,574.0 2,574.0 18:00 19:30 10/25/2019 10/25/2019 2.00 INTRM1 CEMENT HOSO P P/U and make up 9 5/8" pups, hanger, 2,574.0 2,574.0 19:30 21:30 and landing A 10/25/2019 10/25/2019 0.50 INTRM1 CEMENT OTHR P Run the seal Assy to 1 foot above the 2,574.0 2,574.0 21:30 22:00 liner top. to freeze Protect. 10/25/2019 10/26/2019 2.00 INTRM1 CEMENT FRZP P PJSM. Close annular, verify 2,574.0 2,574.0 22:00 00:00 circulation. Pump 30 bbls of HiVIS spacer followed by 34 bbls of seawater. Pumped 131 bbls of freeze protect. 10/26/2019 10/26/2019 0.50 INTRM1 CEMENT FRZP P Continue pumping freeze protect with 2,574.0 2,574.0 00:00 00:30 LRS. BPM = 3 PSI = 500 10/26/2019 10/26/2019 1.00 INTRM1 CEMENT PRTS P Strip casing in hole and land. Test seal 2,574.0 2,574.0 00:30 01:30 assembly to 1,000 psi for 10 min. Test successful. 10/26/2019 10/26/2019 1.00 INTRM1 CEMENT RURD P RD LRS. Blow down top drive. 2,574.0 2,574.0 01:30 02:30 Backout landing joint. 10/26/2019 10/26/2019 1.00 INTRM1 CEMENT RURD P RD / LID casing running equipment 2,574.0 2,574.0 02:30 03:30 10/26/2019 10/26/2019 2.00 INTRM1 CEMENT WWSP P Installed pack -off. Tested to 5,000 psi. 2,574.0 2,574.0 03:30 05:30 Test successful. 10/26/2019 10/26/2019 0.50 INTRM1 CEMENT RURD P MU 8.8125" wear ring and install in 2,574.0 2,574.0 05:30 06:00 wellhead. Clear rig floor and prep to LID 5-7/8" DP. 10/26/2019 10/26/2019 1.25 INTRM1 CEMENT PULD P LID 5-7/8" DP via mousehole. 2,574.0 2,574.0 06:00 07:15 10/26/2019 10/26/2019 1.00 INTRM1 CEMENT PULD P MU stack washer and trip 5-7/8" DP / 849.0 849.0 07:15 08:15 RIH 849'. 10/26/2019 10/26/2019 2.25 INTRM1 CEMENT PULD P POOH from 849' laying down 5-7/8" 849.0 0.0 08:15 10:30 DP (9 stands) via rig tongs. 10/26/2019 10/26/2019 1.50 INTRM1 CEMENT PULD P MU stack washer and trip 5-7/8" DP / 0.0 943.0 10:30 12:00 RIH to 943' MD 10/26/2019 10/26/2019 1.50 INTRM1 CEMENT PULD P RIH with 5-7/8" DP from 943' to 3,317' 943.0 3,317.0 12:00 13:30 10/26/2019 10/26/2019 4.50 INTRM1 CEMENT PULD P POOH from 3,317'to 1,078' laying 3,317.0 1,078.0 13:30 18:00 down 5-7/8" DP Page 16/52 Report Printed: 1/9/2020 %aperations Summary (with Timelog L apths) CD4-594 46 Rig: DOYON 141 Job: DRILLING ORIGINAL Time Log Start Depth Start Time End Time Dur (hr) Phase Op Code Activity Code Time P-T-X Operation (ftKB) End Depth (ftKB) 10/26/2019 10/26/2019 2.00 INTRM1 CEMENT PULD P Continue POOH from 1,078'to surface 1,078.0 0.0 18:00 20:00 laying down 5-7/8" DP 10/26/2019 10/26/2019 2.00 INTRM1 CEMENT PULD P TIH with remaining 5-7/8" DP to 3,600' 0.0 3,600.0 20:00 22:00 10/26/2019 10/27/2019 2.00 INTRM1 CEMENT PULD P POOH laying down 5-7/8" DP from 3,600.0 2,700.0 22:00 00:00 3600'-2700' 10/27/2019 10/27/2019 6.00 INTRM1 CEMENT PULD P Lay down 5-7/8" drill pipe from 2700' 2,700.0 0.0 00:00 06:00 to surface. 10/27/2019 10/27/2019 0.75 INTRM1 CEMENT RURD P Clear & clean rig floor. 0.0 0.0 06:00 06:45 10/27/2019 10/27/2019 0.50 INTRM1 CEMENT SVRG P Service Top Drive. 0.0 0.0 06:45 07:15 10/27/2019 10/27/2019 5.25 INTRM1 CEMENT RURD P *** NEEDS FIXED*** TEST 0.0 0.0 07:15 12:30 RESULTS? Drain stack & change out upper rams from 9-5/8" solid body to 3-1/2" X 6" VBR. NOTE: Difficultly loosing ram door bolts. 10/27/2019 10/27/2019 8.50 INTRM1 CEMENT PULD P PJSM, rig up & pick up 5" DP running 0.0 5,483.0 12:30 21:00 in the hole from surface to' MD.5,483' 10/27/2019 10/28/2019 3.00 INTRM1 CEMENT PULD P Tooh 5,483'to Surface. with the 5" 5,483.0 0.0 21:00 00:00 D.P. and stand back in the Derrick. 10/28/2019 10/28/2019 0.50 INTRM1 CEMENT RURD P Clear And Clean the rig Floor 0.0 0.0 00:00 00:30 10/28/2019 10/28/2019 1.50 INTRM1 EVALWB ELOG P PJSM, R/U Wireline tools. 0.0 0.0 00:30 02:00 10/28/2019 10/28/2019 4.00 INTRM1 EVALWB ELOG P Run the Cast m Log F/ 6000' to 4803" 6,000.0 4,803.0 02:00 06:00 10/28/2019 10/28/2019 4.75 INTRM1 EVALWB ELOG P Run the Cast m Log F/ 4803' to 0.0 6,000.0 4,803.0 06:00 10:45 10/28/2019 10/28/2019 1.75 INTRM1 EVALWB ELOG P Hold A Pjsm laydown the Wireline And 4,803.0 0.0 10:45 12:30 all of the Wireline Tools. 10/28/2019 10/28/2019 0.50 INTRM1 CEMENT SVRG P Service the Rig and the top drive. 0.0 0.0 12:30 13:00 10/28/2019 10/28/2019 0.50 INTRM1 CEMENT RURD P Pick up the 4" handling tools to The 0.0 0.0 13:00 13:30 Rig Floor. 10/28/2019 10/28/2019 4.50 INTRM1 CEMENT PULD P Pick up the 14# 4" Drill pipe. From 0.0 4,445.0 13:30 18:00 Surface to 4,445'. 10/28/2019 10/28/2019 3.50 INTRMI CEMENT TRIP P Pump A Dry Job,And Pooh. 4,445.0 0.0 18:00 21:30 10/28/2019 10/29/2019 2.50 INTRM1 CEMENT SVRG P PJSM, Change out saver sub to XT-39 0.0 0.0 21:30 00:00 10/29/2019 10/29/2019 1.50 INTRM1 CEMENT RURD P Pull Wear Bushing, Install test plug, 10,267.0 10,267.0 00:00 01:30 Rig up to Test Bops. 10/29/2019 10/29/2019 4.50 INTRM1 WHDBOP BOPE P PJSM, Test BOPS, W/ 5" and 3 1/2" 10,267.0 10,267.0 01:30 06:00 test jt. -250 psi low, 3500 psi high, F/ 5min Ea. - test annular, demco kill, IBOP, valves 12, 13, 14, upper 3.5 X 6" rams, HCR kill, Main IBOP, valves 9, 11, 13 FOSV, HCR choke, lower rams, valves 4, 7, 5, 6, Start psi 3000 psi, pressure after closing 1900 psi, .163 sec @ 200 psi, nitrogemn bottle Average 1975 psi Page 17/52 Report Printed: 1/9/2020 operations Summary (with Timelog L epths) CD4-594 Rig: DOYON 141 Job: DRILLING ORIGINAL Time Log Start Depth Start Time End Time Dur (hr) Phase Op Code Activity Code Time P-T-X Operation (ftKB) End Depth (ftKB) 10/29/2019 10/29/2019 2.50 INTRMI CEMENT BOPE P Start psi 3000 psi, pressure after 10,267.0 10,267.0 06:00 08:30 closing 1900 psi, .163 sec @ 200 psi, nitrogemn bottle Average 1975 psi.Perform drawdown test on Hydraulic/Manual chokes to 1500 psi and bleed off. Good test.Test annular, Upper VBR's and Lower VBR's with 3- 1/2" test joint to 250 psi low and 3500 psi high for 5 minutes on each test 10/29/2019 10/29/2019 0.50 INTRM1 CEMENT RURD P Rig down test equipment. Blowdown 10,267.0 10,267.0 08:30 09:00 choke and kill lines. Pull and lay down test plug 10/29/2019 10/29/2019 0.25 INTRM1 CEMENT RURD P Install wear ring. I.D. = 8.8125" 10,267.0 10,267.0 09:00 09:15 10/29/2019 10/29/2019 1.00 INTRM1 DRILLOUT BHAH P Mobilize BHA components to the rig 10,267.0 10,267.0 09:15 110.15 floor via the beaver slide. 10/29/2019 10/29/2019 1.75 INTRM1 DRILLOUT BHAH P Pick up BHA to 207' per directional 10,267.0 10,267.0 10:15 12:00 driller and MWD 10/29/2019 10/29/2019 2.75 INTRM1 DRILLOUT BHAH P PU BHA from 207' MD to 570' MD 10,267.0 10,267.0 12:00 14:45 10/29/2019 10/29/2019 1.00 INTRM1 DRILLOUT PULD P PU and RIH with 4" DP to 1,514' MD 10,267.0 10,267.0 14:45 15:45 10/29/2019 10/29/2019 0.75 INTRM1 DRILLOUT DHEQ P Shallow hole test tools at-1,514' MD 10,267.0 10,267.0 15:45 16:30 with 390 gpm, 760 psi, 40 RPM and 2,000 ft-lb 10/29/2019 10/29/2019 0.25 INTRM1 DRILLOUT PULD T Fail shallow hole test. Blowdown top 10,267.0 10,267.0 16:30 16:45 drive and POOH from 1,514' to 291' MD 10/29/2019 10/29/2019 0.25 INTRM1 DRILLOUT PULD T Cleaned screen in mudguard 675 - no 10,267.0 10,267.0 16:45 17:00 debris found 10/29/2019 10/29/2019 1.00 INTRM1 DRILLOUT PULD T RIH from 291' to 1,043' MD 10,267.0 10,267.0 17:00 18:00 10/29/2019 10/29/2019 5.50 INTRM1 DRILLOUT PULD P Continue single in hole from pipeshed 10,267.0 10,267.0 18:00 23:30 from 1,043' MD to 5,841' MD. 10/29/2019 10/30/2019 0.50 INTRM1 DRILLOUT PULD P Continue TIH on 4" DP from 5,841' 10,267.0 10,267.0 23:30 00:00 MD to 6,142' MD 10/30/2019 10/30/2019 3.00 INTRM1 DRILLOUT PULD P Continue Tih W/ the 4" D.P. F/6,142' to 10,267.0 10,267.0 00:00 03:00 9,923'. 10/30/2019 10/30/2019 1.50 INTRM1 DRILLOUT RURD P PJSM Changing the 4" Saver to the 4 10,267.0 10,267.0 03:00 04:30 1/2" IF Saver Sub. 10/30/2019 10/30/2019 0.50 INTRM1 DRILLOUT SVRG P Service the rig And the top drive,and 10,267.0 10,267.0 04:30 05:00 adjust the Brakes on the Drawworks. 10/30/2019 10/30/2019 1.00 INTRM1 DRILLOUT MPDA P PJSM Pull the trip Nipple & Install The 10,267.0 10,267.0 05:00 06:00 Rpd bearing 10/30/2019 10/30/2019 1.75 INTRM1 DRILLOUT MPDA P Function test the MPD System, Find 10,267.0 10,267.0 06:00 07:45 the friction Values & Drig Rates. 10/30/2019 10/30/2019 0.75 INTRM1 DRILLOUT MPDA P PJSM Pull the RCD /And Install the 10,267.0 10,267.0 07:45 08:30 Trip Nipple 10/30/2019 10/30/2019 0.75 INTRM1 DRILLOUT RURD P @ 10,024'. Blowdown the top drive 10,267.0 10,267.0 08:30 09:15 And Rig up to Test the 9 5/8" Casing. 10/30/2019 10/30/2019 0.75 INTRM1 DRILLOUT PRTS P PJSM Rig up and test the Liner to 10,267.0 10,267.0 09:15 10:00 2900 PSI F/30 Mins. And Chart the same. Good Test. 10/30/2019 10/30/2019 0.25 INTRM1 DRILLOUT RURD P Rig Down the testing 10,267.0 10,267.0 10:00 10:15 Equipment, BlowDown the Cmt Line & the Kill Lines. 10/30/2019 10/30/2019 0.50 INTRM1 DRILLOUT WASH P Wash Down F/10,024' To 10,133'And 10,267.0 10,267.0 10:15 10:45 tag the Float Collar @ 10,133' 10/30/2019 10/30/2019 7.25 INTRM1 DRILLOUT DRLG P Drill The Plug's, Float Collar, Cement 10,267.0 10,267.0 10:45 18:00 And the Float Shoe, Page 18/52 Report Printed: 1/9/2020 taperations Summary (with Timelog L,apths) C D4-594 Rig: DOYON 141 Job: DRILLING ORIGINAL Time Log Start Depth Start Time End Time Dur (hr) Phase Op Code Activity Code Time P-T-X Operation (ftKB) End Depth (ftKB) 10/30/2019 10/30/2019 5.50 INTRMI DRILLOUT DRLG P Drill the shoe Track, and 20 Feet of 10,267.0 10,267.0 18:00 23:30 New formattion 10,267' to 10,287'. Gpm=260, PSI=1470, Rpm=60,Torque=11 K Wob=15-20K, Flow 20%. 10/30/2019 10/31/2019 0.50 INTRM1 DRILLOUT CIRC P Circ Bottoms up,to Run The Fit Test. 10,267.0 10,267.0 23:30 00:00 10/31/2019 10/31/2019 1.00 INTRM1 DRILLOUT FIT P stand back 1 stand of D.P. Rig Up And 10,267.0 10,267.0 00:00 01:00 Perform the Fit Test to 15PPG Equivalent, 717 Psi. 10/31/2019 10/31/2019 0.50 PROD1 DRILL MPDA P Pull The Trip Nipple & Install the MPD 10,267.0 10,267.0 01:00 01:30 Bearing. 10/31/2019 10/31/2019 4.00 PROD1 DRILL DISP P Displace the 11.0PPG drilling Mud to 10,267.0 10,267.0 01:30 05:30 9.2PPG LSND drilling Mud 10/31/2019 10/31/2019 1.00 PROD1 DRILL SVRG P Rig Service,Service the top Drive, And 10,267.0 10,267.0 05:30 06:30 Change a 4" And a 2" Demco Valve. 10/31/2019 10/31/2019 3.00 PRODI DRILL DISP P Continue Displacing the 11.0PPG Mud 10,267.0 10,267.0 06:30 09:30 to 9.3PPPG LSND Mud. 10/31/2019 10/31/2019 0.25 PROD1 DRILL WASH P Wash in the hole F/10,271' to 10,287', 10,267.0 10,287.0 09:30 09:45 500 Gpm 1880 Psi, 80 Rpm, Tor 10/31/2019 10/31/2019 8.50 PROD1 DRILL DDRL P Drill F/10271; to 10,992', 3,468 TVD, 10,287.0 10,992.0 09:45 18:15 W/ 500 Gpm @ 2350 Psi 120 Rpm, 6K torque, 10 to 13K Bit wrt, ECD= 10.97, 32% Flow Out, UP 107K , DN 57K Rotating 76K, Off Btm Psi= 2,300 Psi, Torque 4.5K, Holding 11.0 EMD, w/MPD Drlg & On Connection's, SPR @ 10,398' MD,3,461 TVD @ 11:30 HRS & #1@ 25 350 to /35= 350/200- 480/168, # 2@ 25 SPM/ 35 SPM 340/210-470/205 Psi, ADT- 1.68, Jars- 1.68'. Hold 11.0 EMW w/Mpd while drilling & on Connection's. 10/31/2019 11/1/2019 5.75 PROD1 DRILL DDRL P Drill F/10,992',To 11,537'-3,539' TVD, 10,992.0 11,537.0 18:15 00:00 W/ 500 Gpm @ 3030 Psi 120 Rpm, 6K torque, 13 to 13K Bit wrt, ECD= 11-92, 32% Flow Out, UP 117K , DN 55K Rotating 92K, Off Btm Psi= 2'960Psi, Torque 4.5K, Hold 11.0 EMW w/Mpd while drilling & on Connection's. 11/1/2019 11/1/2019 2.50 PROD1 DRILL DDRL P Drill F/10,992',To 11,791'-3,559'TVD, 10,992.0 11,791.0 00:00 02:30 W/ 500 Gpm @ 3100 Psi 120 Rpm, 6K torque, 13 to 13K Bit wrt, ECD= 11-92, 40% Flow Out, UP 120K , DN 57K Rotating 76K, Off Btm Psi= 2'960Psi, Torque 4.5K, Hold 11.9 EMW w/Mpd while drilling & on Connection's. BIT HR's 12.73, total Jar Hrs, 12.73 11/1/2019 11/1/2019 4.00 PROD1 DRILL OTHR T Lost Returns.Pull 1 stand of drill 11,791.0 11,791.0 02:30 06:30 pipe,Pump 2 35 BBL Lcm Pill With 40 # Per BBI of LCM, Rotate and Reciprocate the drill String While Pumping 80 GPM, @ 730 Psi,10 Rpm's. Torque 9K with no returns. 944 BBLs Lost to the Hole. 11/1/2019 11/1/2019 0.50 PROD1 DRILL OTHR T Pump 2nd LCM sweep and drilled 11,791.0 11,803.0 06:30 07:00 F/11791' to 11,803' when LCM sweep reached the bit, Regained returns with ECD's of 11.09 ppg initally. ECD's decreased to 10.86 ppg. GPM 440, Psi=2500, Rpm= 80 Torque=8 Wob=10k Page 19/52 Report Printed: 1/9/2020 t..perations Summary (with Timelog uapths) C D4-594 Rig: DOYON 141 Job: DRILLING ORIGINAL Time Log Start Depth Start Time End Time our (hr) Phase Op Code Activity Code Time P-T-X Operation (ftKB) End Depth (ftKB) 11/1/2019 11/1/2019 8.00 PROD1 DRILL BKRM T BROOH F/ 11803'to 10,860' 11,803.0 10,860.0 07:00 15:00 Gpm=500, Psi= 2600., Flow 40% Rpm=130, TQ 5k. 11/1/2019 11/1/2019 2.25 PROD1 DRILL BKRM T BROOH F/10,860'to 10,237' 10,860.0 10,237.0 15:00 17:15 Gpm=500, Psi= 2600., Flow 40% Rpm=130, TQ 5k. Gpm 194, Psi 700, Flow 17%, Rpm 80, TQ 5k 11/1/2019 11/1/2019 1.25 PROD1 DRILL RGRP T Circ and change the Totco Weight 10,237.0 10,237.0 17:15 18:30 Indicator. 11/1/2019 11/1/2019 1.00 PROD1 DRILL TRIP T TIH F/10,237'to 10,500' 10,237.0 10,500.0 18:30 19:30 11/1/2019 11/1/2019 1.25 PROD1 DRILL CIRC T Circulate Bttms up @10,500', 10,500.0 10,500.0 19:30 20:45 Spm=168, Gpm=500, Psi=2400, Rpm 100, TQ=3k, Flow= 41 % 11/1/2019 11/1/2019 1.25 PROD1 DRILL TRIP T TIH from 10,500' MD to 11,600' MD 10,500.0 11,600.0 20:45 22:00 11/1/2019 11/1/2019 0.75 PROD1 DRILL WASH T Wash and ream from 11,600' MD to 11,600.0 11,803.0 22:00 22:45 11,803' MD 11/1/2019 11/2/2019 1.25 PROD1 DRILL CIRC T Pump 110 bbl pill @ 174 SPM, 500 11,803.0 11,803.0 22:45 00:00 GPM, 2600 PSI 11/2/2019 11/2/2019 6.00 PROD1 DRILL DDRL P Drlg The 8 3/4" Pilot Hole. F/11,791' to 11,791.0 12,180.0 00:00 06:00 12,180', 3,581 TVD, W/ 500 Gpm @ 2680 Psi 150 Rpm, torque 7-8 on BTTM Off BTTM TQ 3-5 13K Bit wrt, ECD= 11..92, 38% Flow Out, UP 120K , DN 60K Rotating 85K, W/ 500 Gpm @ 2680 Psi .Off Btm Psi= 2'580Psi, BIT HR's 17.62, total Jar Hrs, 17.62. 11/2/2019 11/2/2019 6.00 PROD1 DRILL DDRL P Drlg 8 3/4" Pilot Hole F/12,180' and To 12,180.0 12,478.0 06:00 12:00 12,478' Md, TVD=3,604', P/U WT=115, S/O WT=65, ROT WT=90, TQ ON=7-9, TQ Off=4-5, Flow Out=40% WOB=10 To15K RPM=150, GPM=550, Total SPM 185, PSI ON BTTM=3300 Psi, PSI off BTTM=3300, ECD'S=11.44 PPG, ADT=4.5, Total Bit Hrs=21.77 Total Jar Hrs=21.77, Pump 30 BBL NPM/Sapp Sweeps Every Other Connection's. 11/2/2019 11/2/2019 6.00 PROD1 DRILL DDRL P Drlg 8 3/4" Pilot Hole F/12,478' Md,To 12,478.0 12,762.0 12:00 18:00 12,762' TVD=3,644', P/U WT=120, S/O WT=65, ROT WT=90, TQ ON=7- 9, TQ Off=4-5, Flow Out=44% WOB=10 Tot 5K RPM=150, GPM=550, Total SPM 185, PSI ON BTTM=3350 Psi, PSI off BTTM=3300, ECD'S=11.44 PPG, ADT=4.5, Total Bit Hrs=21.77 Total Jar Hrs=21.77, Pump 30 BBL NPM/Sapp Sweeps Every Other Connection's. Perform Dynamic Fit Test to 13.0 PPG While Drilling @ 12,750' Page 20/52 Report Printed: 1/9/2020 operations Summary (with Timelog Lepths) CD4-594 Rig: DOYON 141 Job: DRILLING ORIGINAL Time Log Start Depth Start Time End Time Dur (hr) Phase Op Code Activity Code Time P-T-X Operation (ftKB) End Depth (ftKB) 11/2/2019 11/3/2019 6.00 PROD1 DRILL DDRL P Drlg 8 3/4" Pilot Hole F/12,762' Mcljo 12,762.0 13,034.0 18:00 00:00 13,034' TVD=3,650', P/U WT=118, S/O WT=68, ROT WT=95, TQ ON=6, TQ Off=5, Flow Out=36% WOB=3.5 RPM=150, GPM=550, Total SPM 187, PSI ON BTTM=3560 Psi, PSI off BTTM=3480, ECD'S=11.24 PPG, ADT=4.18, Total Bit Hrs=30.80 Total Jar Hrs=30.80, Pump 30 BBL NPM/Sapp Sweeps Every Connection's. Perform Dynamic Fit Test to 13.0 PPG While Drilling @ 13,045' 11/3/2019 11/3/2019 7.00 PROD1 DRILL DDRL P Drlg 8 3/4" Pilot Hole F/13,034' To 13,034.0 13,310.0 00:00 07:00 13,310' TVD=3,825', P/U WT=130, S/O WT=75k, ROT WT=94, TQ ON=6, TQ Off=5, Flow Out=36% WOB=3.5 RPM=150, GPM=550, Total SPM 187, PSI ON BTTM=3560 Psi, PSI off BTTM=3480, ECD'S=11.24 PPG, ADT=4.18, Total Bit Hrs=30.80 Total Jar Hrs=30.80, Pump 30 BBL NPM/Sapp Sweeps Every Connection's. Perform Dynamic Fit Test to 13.0 PPG While Drilling @ 13, 045' 11/3/2019 11/3/2019 6.00 PROD1 DRILL DDRL P Drlg 8 3/4" Pilot Hole F/13,310' To 13,310.0 13,520.0 07:00 13:00 13,520' TVD=3,934', P/U WT=135, S/O WT=85k, ROT WT=104, TQ ON=6, TQ Off=5, Flow Out=37% WOB=7.0 RPM=150, GPM=550, Total SPM 187, PSI ON BTTM=3640 Psi, PSI off BTTM=3600, ECD'S=11.24 PPG, ADT=4.18, Total Bit Hrs=30.80 Total Jar Hrs=30.80, Perform Dynamic Fit Test to 13.0 PPG While Drilling . 11/3/2019 11/3/2019 3.00 PROD1 DRILL DDRL P Drlg 8 3/4" Pilot Hole F/13,520' To 13,520.0 13,700.0 13:00 16:00 13,700' TVD=4,031', P/U WT=138, S/O WT=83k, ROT WT=106, TQ ON=6, TQ Off=5, Flow Out=37% WOB=5-10 RPM=150, GPM=550, Total SPM 187, PSI ON BTTM=3590 Psi, PSI off BTTM=3570, ECD'S=11.10 PPG, ADT=4.18, Total Bit Hrs=30.80 Total Jar Hrs=33.0, . 11/3/2019 11/3/2019 1.00 PROD1 DRILL CIRC P Circ Bttms Up @ 13,700' MD, 4,031' 13,700.0 13,700.0 16:00 17:00 TVD, SM=187, GPM =551, Psi=3600, RPM 150, TQ=5K Flow Out=37%, ECD=11.04. 11/3/2019 11/3/2019 1.50 PROD1 DRILL PMPO P Pump Out Of The Hole F/13,700' to 13,700.0 13,700.0 17:00 18:30 13,361', Spm=187, GPM=551, PSI= 3660, RPM= 0, Flow out=36% ECD 11.21,P/U Wt=130, S/O WT=85 11/3/2019 11/3/2019 0.50 PROD1 DRILL FIT P Perform Dynamic Fit Test 12.8 PPG @ 13,700.0 13,700.0 18:30 19:00 13,361' MD 11/3/2019 11/3/2019 2.00 PROD1 DRILL CIRC P Pump in the Hole F/13,361' to 13,700', 13,700.0 13,700.0 19:00 21:00 GPM=550, Psi=3700, Rpm=40 Tq=5 11/3/2019 11/3/2019 2.00 PROD1 DRILL DDRL P Drlg 8 3/4" Pilot Hole F/13,700' To 13,700.0 13,805.0 21:00 23:00 13,805' TVD=4,031', P/U WT=138, S/O WT=83k, ROT WT=106, TQ ON=6, TQ Off=5, Flow Out=37% WOB=5-10 RPM=150, GPM=550, Total SPM 187, PSI ON BTTM=3590 Psi, PSI off BTTM=3570, ECD'S=11.10 PPG, ADT=4.18, Total Bit Hrs=30.80 Total Jar Hrs=33.0, . Page 21/52 Report Printed: 1/9/2020 Operations Summary (with Timelog Depths) C D4-594 Rig: DOYON 141 Job: DRILLING ORIGINAL Time Log Start Depth Start Time End Time our (hr) Phase Op Code Activity Code Time P-T-X Operation (ftKB) End Depth (ftKB) 11/3/2019 11/4/2019 1.00 PROD1 DRILL SRVY T Trouble shoot the MWD tools, it Took 13,805.0 13,805.0 23:00 00:00 1 hr to pump up a Survey 11/4/2019 11/4/2019 1.00 PROD1 DRILL DDRL P Drig 8 3/4" Pilot Hole F/13,805' To 13,805.0 14,050.0 00:00 01:00 14,050' TVD=4,244', P/U WT=138, S/O WT=80k, ROT WT=105, TO ON=6-7, TQ Off=4-5, Flow Out=37% WOB=8 RPM=150, GPM=550, Total SPM 187, PSI ON BTTM=3540 Psi, PSI off BTTM=3530, ECD'S=11.03 PPG, ADT=2.54, Total Bit Hrs=43.99 Total Jar Hrs=43.99. 11/4/2019 11/4/2019 6.00 PROD1 DRILL DDRL P Drlg 8 3/4" Pilot Hole F/13,838' To 13,383.0 14,010.0 00:00 06:00 14,010' TVD=4,215', P/U WT=137, S/O WT=87k, ROT WT=108, TQ ON=6-7, TO Off=4-5, Flow Out=40% WOB=3 RPM=150, GPM=550, Total SPM 187, PSI ON BTTM=3700 Psi, PSI off BTTM=3750', ECD'S=11.01 PPG, ADT=3.75, Total Bit Hrs=47.74 Total Jar Hrs=47.74' 11/4/2019 11/4/2019 6.00 PROD1 DRILL DDRL P Drlg 8 3/4" Pilot Hole F/14,010' to 14,010.0 14,472.0 06:00 12:00 14,272' TVD=4,215', P/U WT=140, S/O WT=85k, ROT WT=122, TQ ON=6-7, TQ Off=4-5, Flow Out=36% WOB=5-10 RPM=150, GPM=550, Total SPM 188, PSI ON BTTM=3710 Psi, PSI off BTTM=3700', ECD'S=11.14 PPG, ADT=4.39, Total Bit Hrs=52.13 Total Jar Hrs=52.13 11/4/2019 11/4/2019 6.00 PROD1 DRILL DDRL P Drlg 8 3/4" Pilot Hole F/14,272' to 14,472.0 14,490.0 12:00 18:00 14,590' TVD=4,215', P/U WT=140, S/O WT=85k, ROT WT=112, TQ ON=6-7, TQ Off=4-5, Flow Out=36% WOB=5-10 RPM=150, GPM=550, Total SPM 188, PSI ON BTTM=3710 Psi, PSI off BTTM=3700', ECD'S=11.14 PPG, ADT=4.39, Total Bit Hrs=52.13 Total Jar Hrs=52.13 11/4/2019 11/4/2019 2.50 PROD1 DRILL DDRL P Drlg 8 3/4" Pilot Hole F/14,590' to 14,490.0 14,747.0 18:00 20:30 14,747' TVD=4,709', P/U WT=155, S/O WT=97k, ROT WT=112, TQ ON=7.5, TO Off=7, Flow Out=35% WOB=6-8 RPM=130, GPM=550, Total SPM 187, PSI ON BTTM=3800 Psi, PSI off BTTM=3770', ECD'S=11.17 PPG, ADT=6.40, Total Bit Hrs=54.13 Total Jar Hrs=54.13 11/4/2019 11/4/2019 0.50 PROD1 PLUG OTHR P Obtain Then Final Torque & Drag, Get 14,747.0 14,747.0 20:30 21:00 SPR's And Survey 11/4/2019 11/5/2019 3.00 PROD1 PLUG CIRC P Circulate 2 Bottoms up, At GPM=550, 14,747.0 14,747.0 21:00 00:00 PSI=3350, RPM=120, TQ=6K, Rot Wt.118 11/5/2019 11/5/2019 2.50 PROD1 EVALFM PMPO P Pump out of hole F/14747' T/ 14120', 14,747.0 14,120.0 00:00 02:30 With 550 gpm, 3600 spp, p/u 135k 11/5/2019 11/5/2019 1.50 PROD1 EVALFM DLOG P Log/ correlate Depth @ 120 FPH W/ 14,120.0 14,120.0 02:30 04:00 MWD, F/ 14120, GPM 550, Spp 3600, P/U 137 K. 11/5/2019 11/5/2019 1.50 PROD1 EVALFM DLOG P Perform Stick test - test good. 14,120.0 14,120.0 04:00 05:30 11/5/2019 11/5/2019 6.50 PROD1 EVALFM DLOG P Perform Stethoscope formation test @ 14,120.0 14,100.0 05:30 12:00 F/ 141 00'T/ 14,080', W/ 195 spm, 575 gpm, 3700 spp, P/U 140 K, S/O 90 K. Page 22/52 Report Printed: 1/9/2020 Operations Summary (with Timelog Depths) CD4-594 Rig: DOYON 141 Job: DRILLING ORIGINAL Time Log Start Depth Start Time End Time Dur (hr) Phase Op Code Activity Code Time P-T-X Operation (ftKB) End Depth (ftKB) 11/5/2019 11/5/2019 6.00 PROD1 EVALFM DLOG P Perform Stethoscope formation test @ 14,100.0 13,899.0 12:00 18:00 13871', 13874', 13881.67/', 13884' 13891' 13899', 13915' 13955', 13996' 13999' 14004', 14037', 14056' 14059', 14064', W/ 195 spm, 575 gpm, 3620 spp, P/U 140 K, S/O 80 K. 11/5/2019 11/5/2019 2.50 PROD1 EVALFM DLOG P Perform Stethoscope formation test @ 13,899.0 13,871.0 18:00 20:30 14066', 10079', 14086', 14091', 14096', W/ 195 spm, 575 gpm, 3620 spp, P/U 140 K, S/O 80 K. 11/5/2019 11/5/2019 1.50 PROD1 EVALFM TRIP P Trip in hole F/13871' T/ 14,100' 13,871.0 14,100.0 20:30 22:00 11/5/2019 11/5/2019 1.00 PROD1 EVALFM CIRC P CBU @ 14069 W/ 550 gpm, 3350 spp, 14,100.0 14,100.0 22:00 23:00 P/U 130 k, S/O 11/5/2019 11/6/2019 1.00 PROD1 PLUG PMPO P Pump out of hole F/ 14,100. T/ top of 14,100.0 13,752.0 23:00 00:00 Narwhal sand @ 13752' 11/6/2019 11/6/2019 1.50 PROD1 PLUG FIT P Continue Performing Dynamic Fit test, 13,752.0 13,752.0 00:00 01:30 observe fluid loss @ 12.5 PPG, GPM 550, Spp 3320, RPM 50, TRQ 7/8K, RY WT 105 K 11/6/2019 11/6/2019 3.00 PROD1 PLUG PMPO P Pump in hole F/ 13752' T/ 14653', 13,752.0 14,653.0 01:30 04:30 GPM 150, spp 880, S/0 93 K 11/6/2019 11/6/2019 4.50 PROD1 PLUG PMPO P PJSM, pump out of hole @ 300 fph F/ 14,653.0 13,300.0 04:30 09:00 14653' & spot wellbore strengthing pill T/ 13300' 11/6/2019 11/6/2019 2.50 PROD1 PLUG CIRC P Weight up mud system F/9.2 T/ 11.0 13,300.0 13,300.0 09:00 11:30 ppg w/spike fluid and braite additions. RPM 60, Trq 5 k, gpm 400, SPP 2400, final ecd 12.3 ppg 11/6/2019 11/6/2019 4.75 PROD1 PLUG CIRC P circulate S/S volume with MPD choke 13,300.0 13,300.0 11:30 16:15 @ 100% open,condition mud W/ 3% lubricant & barite Additions, SOM 48 gpm 140, SPP 640, Flo 20% RPM 60, P/U 105 K, S/O 95 K. 11/6/2019 11/6/2019 0.75 PROD1 PLUG OWFF P Perform SPR's @ 13300' MD, 3828' 13,300.0 13,300.0 16:15 17:00 TVD, flow check well F/ 30 min. 11/6/2019 11/6/2019 0.50 PROD1 PLUG PMPO P Pump out of hole F/ 13290' T/ 13230', 13,300.0 13,230.0 17:00 17:30 spm 48, spm 140, spp 660, B/D top drive 11/6/2019 11/6/2019 6.00 PROD1 PLUG SMPD P Strip OOH F/ 13290' T10,015' W/MPD 13,230.0 10,015.0 17:30 23:30 holding 220 psi on annulas @ 500 fph per schelude 11/6/2019 11/7/2019 0.50 PROD1 PLUG CIRC P CBU @10,015' @ 140 gpms, Spp 630 10,015.0 10,015.0 23:30 00:00 11/7/2019 11/7/2019 2.50 PROD1 PLUG CIRC P Cont. Curclating, GPM 140, RPM 20, 10,015.0 10,015.0 00:00 02:30 TRQ 4K, ROT 75K 11/7/2019 11/7/2019 0.50 PROD1 PLUG OWFF P OWFF F/ 30 min, well static. 10,015.0 10,015.0 02:30 03:00 11/7/2019 11/7/2019 1.50 PROD1 PLUG RURD P PJSM, Change out saver sub onTD T/ 10,015.0 10,015.0 03:00 04:30 XT 39 11/7/2019 11/7/2019 1.50 PROD1 PLUG MPDA P PJSM, remove 5" MPD bearing and 10,015.0 10,015.0 04:30 06:00 install 4" MPD bearing 11/7/2019 11/7/2019 0.50 PROD1 PLUG SMPD P Stand back 1 std and drop 2.44" OD 10,015.0 9,828.0 06:00 06:30 metal drivt w/ 1 00'of wire on STD # 99 @ 9828' MD. 11/7/2019 11/7/2019 3.50 PROD1 PLUG SMPD P Cont. stripping out of the hole W/ 9,828.0 7,750.0 06:30 10:00 MPD, F/ 9828' T/ 7750', @ 1500 / 2000 FPH 11/7/2019 11/7/2019 0.50 PROD1 PLUG SVRG P Service rig. 7,750.0 7,750.0 10:00 10:30 11/7/2019 11/7/2019 0.75 PROD1 PLUG OTHR T Lathe 2,44" drift T/ 2.41 after 4" DP 7,750.0 7,750.0 10:30 11:15 1 I would not drift. Page 23/52 Report Printed: 1/9/2020 Operations Summary (with Timelog Depths) C D4-594 Rig: DOYON 141 Job: DRILLING ORIGINAL Time Log Start Depth Start Time End Time Dur (hr) Phase Op Code Activity Code Time P-T-X Operation (ftKB) End Depth (ftKB) 11/7/2019 11/7/2019 0.75 PROD1 PLUG SMPD P Cont. Stripping out of w/ MPD F/7750' 7,750.0 7,000.0 11:15 12:00 T / 7000' 11/7/2019 11/7/2019 1.00 PROD1 PLUG CIRC T Circulate Surface T/ bit @ 130 gpm, 7,000.0 7,000.0 12:00 13:00 450 spp, in attempt to pump down 2.41 drift. 11/7/2019 11/7/2019 3.50 PROD1 PLUG SMPD P Cont. stripping out of hole W/MPD F/ 7,000.0 3,700.0 13:00 16:30 7000 T/ 3700', @ 1500 - 2000 FPH. 11/7/2019 11/7/2019 0.25 PROD1 PLUG PULD T C/O top jt on std #33 3,700.0 3,700.0 16:30 16:45 11/7/2019 11/7/2019 3.75 PROD1 PLUG SMPD P Cont. Stripping out of hole F/ 3700' 3,700.0 665.0 16:45 20:30 T/665". @ 2000 fph. 11/7/2019 11/7/2019 0.50 PROD1 PLUG OWFF P OWFF F/ 30 min, well static. 665.0 665.0 20:30 21:00 11/7/2019 11/7/2019 1.00 PROD1 PLUG MPDA P PJSM, Remove MPD Bearing, Install 665.0 665.0 21:00 22:00 trip nipple 11/7/2019 11/8/2019 2.00 PROD1 PLUG BHAH P PJSM, rack back DHA F/ 665' T/ 213' 665.0 213.0 22:00 00:00 11/8/2019 11/8/2019 2.00 PROD1 PLUG BHAH P Cont. laying down BHA. 213.0 0.0 00:00 02:00 11/8/2019 11/8/2019 0.50 PROD1 PLUG CLEN P Clean and clear rig floor. 0.0 0.0 02:00 02:30 11/8/2019 11/8/2019 1.50 PROD1 PLUG RURD P P/U cementing swivel and install wiper 0.0 0.0 02:30 04:00 plug, L/D cement swivel. 11/8/2019 11/8/2019 3.25 PROD1 PLUG RURD P Mobilize tubing running equip. to 0.0 0.0 04:00 07:15 Floor, rig up tubing running equipment., M/U floor safety valves. Ion XT-39 X Hyd 563 XO. 11/8/2019 11/8/2019 4.25 PROD1 PLUG PUTB P PJSM, pick & run in hole @ 3000 fph, 201.0 3,321.0 07:15 11:30 W/ 3.5", L- 80, 9.3 PPF, HYD 563 tubing, Torq connections T/ 3200 f /lbs. 11/8/2019 11/8/2019 1.50 PROD1 PLUG PUTB P Make up pup jts, xo, & BHKA tool. 3,321.0 3,321.0 11:30 13:00 11/8/2019 11/8/2019 1.25 PROD1 PLUG PUTB P Continue running in hole @ 3000 3,321.0 4,473.0 13:00 14:15 fph, W/ 3.5", L- 80, 9.3 PPF, HYD 563 tubing, Torq connections T/ 3200 ft/Ibs. P/U WT 55K, S/O 47K 11/8/2019 11/8/2019 1.75 PROD1 PLUG RURD P Rig dwn tubing running equip. and 4,473.0 4,473.0 14:15 16:00 clean/clear rig floor. Attempt to drift 9 jts of 4" dp. in shed. 11/8/2019 11/8/2019 0.75 PROD1 PLUG PULD P M/U hyd 563 X xt-39, XO RIH w/ 9 jts 4,473.0 5,439.0 16:00 16:45 4" DP f/ shed. 11/8/2019 11/8/2019 1.25 PROD1 PLUG TRIP P Trip in hole W/ 3 1/2 tubing stinger on 5,439.0 6,923.0 16:45 18:00 4" DP @ 2500 fph, F/ 5439' T/ 6923' 11/8/2019 11/8/2019 2.50 PROD1 PLUG TRIP P RIH F/ 6923' T/ 10252' @ 1500 fph as 6,923.0 10,252.0 18:00 20:30 per trip schedule 11/8/2019 11/8/2019 1.50 PROD1 PLUG CIRC P Circulate TBG volume @ 10,252', 10,252.0 10,252.0 20:30 22:00 GPM 100, SPP 550, Flo 11 % , P/U WT 82 K, S/O WT 52 K, with pumps on, Pumps off P/U 87K, S/O 56 K 11/8/2019 11/9/2019 2.00 PROD1 PLUG TRIP P Cont. Tripping in hole, F/ 10252', T/ 10,252.0 11,206.0 22:00 00:00 11206', @ 1500 fph per trip schedule 11/9/2019 11/9/2019 6.00 PROD1 PLUG TRIP P Cont. RIH on elevators F/ 11301 T/ 11,206.0 13,184.0 00:00 06:00 13184', @ 1500 fph as per trip schedule., S/0 46K, P/U 86 K. 11/9/2019 11/9/2019 2.00 PROD1 PLUG TRIP P Cont. RIH on elevators F/ 13184' T/ 13,184.0 14,000.0 06:00 08:00 14000.', @ 1000 fph as per trip schedule., S/) 55K, P/U 100 K. 11/9/2019 11/9/2019 2.25 PROD1 PLUG TRIP P Cont. RIH on elevators F/ 14000. T/ 1000.0 14,700.0 08:00 10:15 14700', @ 750 fph as per trip schedule., S/O 55K, P/U 115 K. Page 24/52 Report Printed: 1/9/2020 Operations Summary (with Timelog Depths) C D4-594 Rig: DOYON 141 Job: DRILLING ORIGINAL Time Log Start Depth Start Time End Time Dur (hr) Phase Op Code Activity Code Time P-T-X Operation (ftKB) End Depth (ftKB) 11/9/2019 11/9/2019 0.75 PROD1 PLUG RURD P P/U std # 102, RIH & tag bottom @ 14,700.0 14,753.0 10:15 11:00 14,753'. Rack back std, p/u single F/ shed, 4" pup jt, & 4 1/2 x XT 39, cmt head swivel, xo - 4" pup jt, make up cmt line T/ cement head. 11/9/2019 11/9/2019 9.50 PROD1 PLUG CIRC P Establish circ. through cmt head stage 14,753.0 14,753.0 11:00 20:30 pumps up T/ 150 gpm, 50 spm, 880 spp, 18% flow, lower TP T/ 18 - 25 MW F/ 11.0 T/ 10.5 ppg, - no losses observed. 11/9/2019 11/10/2019 3.50 PROD1 PLUG CMNT P PJSM, PT surface lines @ 5000 psi, 14,753.0 14,753.0 20:30 00:00 Batch & pump 40 bbls of 12 ppg MudPush 11, @ 3bpm. mix & pump 346 bbls of 13 ppg tail cement @ 3 bpm. 11/10/2019 11/10/2019 1.00 PROD1 PLUG CMNT P Continue T/ mix & pump 346 bbls of 14,753.0 14,753.0 00:00 01:00 13 ppg tail cement @ 3 bpm.350 / 700 psi, 14% flow, no fluid losses 346bbl cement pumped. 11/10/2019 11/10/2019 1.00 PROD1 PLUG CMNT P Close annular, remove cement hose, 14,753.0 14,753.0 01:00 02:00 drop dart, open annular, displace cement w/ rig pumps @ 3 bpm, 330 spi, 14 % flow dart latched @ 103 bbls pumped, pressured up & chear BHKA, tool sheared @ 2380 psi, blow down TD. wash up cementing equip. 11/10/2019 11/10/2019 4.00 PROD1 PLUG CMNT P P/U 60', install nerf ball & circulate 14,753.0 14,693.0 02:00 06:00 S/S, @ 5 bpm @ 750 spp, 12% flow, - full returns during displacement, - 43 bbls good cement & 114 bbls contanimented mud back on displacement. 11/10/2019 11/10/2019 2.25 PROD1 PLUG CIRC P Circulate & condition mud @ 10682', 14,682.0 14,682.0 06:00 08:15 SPM 55, GPM 162, SPP 800, FLOW 14% 11/10/2019 11/10/2019 0.50 PROD1 PLUG OWFF P Monito well F/ flow, well static, B/D top 14,682.0 10,862.0 08:15 08:45 drive. 11/10/2019 11/10/2019 2.75 PROD1 PLUG TRIP P POOH F/10,862' T/ 8991' MD. 10,862.0 8,991.0 08:45 11:30 11/10/2019 11/10/2019 0.50 PROD1 PLUG RURD P Clean & clear rig floor, drain bop 8,991.0 8,991.0 11:30 12:00 stack. 11/10/2019 11/10/2019 1.50 PROD1 PLUG WWWH P Flush BOP'S with black water, fuction 8,991.0 8,991.0 12:00 13:30 upper & lower rams, annular & HCR valves, B/D choke & kill line break dwn cmt swivel. 11/10/2019 11/10/2019 1.25 PROD1 PLUG BOPE P M/U storm PKR RIH 98' and set pkr 8,991.0 8,991.0 13:30 14:45 11/10/2019 11/10/2019 0.50 PROD1 PLUG BOPE P Release F/ storm PKR POO, lay dwn 8,991.0 9,089.0 14:45 15:15 packer setting tool. 11/10/2019 11/10/2019 0.25 PROD1 PLUG BOPE P close blind rams & test PKR @ 500 9,089.0 9,089.0 15:15 15:30 psi through kill line. 11/10/2019 11/10/2019 1.75 PROD1 PLUG BOPE P Pull wear bushing, rig up to test bop's 9,089.0 9,089.0 15:30 17:15 W 3.5" & 5" test joints. 11/10/2019 11/11/2019 6.75 PROD1 WHDBOP BOPE P Test BOP'S @ 250/ 3500 psi F/ 5 min 9,089.0 9,089.0 17:15 00:00 ea. Tested with 3 1/2" & 5" test jts. tested 3 1/2' X 6' VBR rams, kill line, HCR, upper IBOP, kanual kill valve, lower IBOP, 14 choke valves, choke HCR, blind rams, perfor accumlator Test - system pressure 3000 psi, after closing 1500 psi, 33 sec F/ 200 spi increase, 162 sec. for full charge, 5 nitrogen bottles = 1950 psi. Page 25/52 Report Printed: 1/9/2020 operations Summary (with Timelog Uepths) CD4-594 Rig: DOYON 141 Job: DRILLING ORIGINAL Time Log Start Depth Start Time End Time Dur (hr) Phase Op Code Activity Code Time P-T-X Operation (ftKB) End Depth (ftKB) 11/11/2019 11/11/2019 0.50 PROD1 WHDBOP BOPE P Cont. testing bop. All components 9,089.0 9,089.0 00:00 00:30 Passed Initial inspection. 11/11/2019 11/11/2019 1.00 PROD1 PLUG RURD P Rig dwn testing equip, pull test plug, 9,089.0 9,089.0 00:30 01:30 set wear bushing, blow down choke / kill lines 11/11/2019 11/11/2019 3.50 PROD1 PLUG RURD P C/O elevators, remove bell guide, M/U 9,089.0 9,089.0 01:30 05:00 running tool, retrive storm PKR, flow check well, B/D FOSV, 5' pup, rack back std. L/d storm PKR, reinstall bell guide on TD. change out elevators. 11/11/2019 11/11/2019 1.00 PROD1 PLUG TRIP P RIH F/ 9027' T/ 9430', observe closed 9,089.0 9,430.0 05:00 06:00 end displacement. break circulation W/ 1487 psi t/ vlear pipe. 11/11/2019 11/11/2019 1.00 PROD1 PLUG TRIP P Cont. RIH F/ 9430' T/ 10,130', P/u 110 9,430.0 10,130.0 06:00 07:00 k, S/O 45k 11/11/2019 11/11/2019 2.00 PROD1 PLUG CIRC P circulate B/U @ 10160', rotate & 10,130.0 10,160.0 07:00 09:00 reciprocate pipe W/ spm 142, gpm 420, SPP 2400, rpm 20, trq, 5/7k Flow 37%, P/U 100k, S/O 65 k. 11/11/2019 11/11/2019 2.75 PROD1 PLUG REAM P Wash & ream F/10,160 T/10190', W. 10,160.0 10,190.0 09:00 11:45 SPM 142, GpM 420, SPP 2400, RPM 20, TRQ 7/8 K, P/U 100 K, S/O, 65K 11/11/2019 11/11/2019 0.25 PROD1 PLUG TRIP P Trip in hole tag plug @ 10,721' MD, 10,190.0 10,721.0 11:45 12:00 P/U 110 K, S/O 40 K 11/11/2019 11/11/2019 6.50 PROD1 PLUG CIRC P Recipcirculate pipe & cond. mud F/ 10,160.0 10,160.0 12:00 18:30 kickoff plug. GPM 408, Spp 2210, RPM 20, Tq 7K, P/U 110 K, S/O 42 K 11/11/2019 11/11/2019 2.50 PROD1 PLUG CMNT P PJSM, BLow Dwn TD, R/U cmt equip. 10,160.0 10,160.0 18:30 21:00 PT cmt lines @ 1000 psi Io / 5000 psi hi.Mix and pump 38.2 bbls of 13 ppg Mud Push II spacer, mix & pump 63.6 bbls of 17 ppg tail cement @ 4 bpm, Drop nerf ball, pump 6.8 bbls of Mud push II @ 4 bpm, followed W/ 10 bbls water. Swap T/ rig & Displace with 80 bbls, mud @ 4bpm. 11/11/2019 11/11/2019 1.50 PROD1 PLUG RURD P R/D cementing equip. TOOH 10 stds 10,160.0 9,617.0 21:00 22:30 T/ 9617', @ 1000 fph, P/U 11 OK, S/O 40 K, 11/11/2019 11/12/2019 1.50 PROD1 PLUG CIRC P Circulate & Condit Mud @ 209 gpm, 9,617.0 9,617.0 22:30 00:00 50 rpms, Spp 834, RT WT P/U 75 K, S/O 73 k 11/12/2019 11/12/2019 5.50 PROD1 PLUG CIRC P Continue conditioning mud, 249 gpm, 9,750.0 9,750.0 00:00 05:30 1022 spp, flow 30%, 11/12/2019 11/12/2019 1.50 PROD1 PLUG SLPC P cut and slip drilling line cut 96' 9,750.0 9,750.0 05:30 07:00 11/12/2019 11/12/2019 1.00 PROD1 PLUG OWFF P OWFF well static, service TD, B/D top 9,750.0 9,750.0 07:00 08:00 drive, install air slips. 11/12/2019 11/12/2019 4.00 PROD1 PLUG TRIP P Trip out of hole F/ 9750 T/4300", std 9,750.0 4,300.0 08:00 12:00 back 4" in drk. 11/12/2019 11/12/2019 1.75 PROD1 PLUG TRIP P Trip out of hole F/4300' T/ 1151', std 4,300.0 1,151.0 12:00 13:45 back 4" in drk. 11/12/2019 11/12/2019 1.50 PROD1 PLUG RURD P B/O XT 39 X/O, Make up safety valve, 1,151.0 1,150.0 13:45 15:15 R/U 3.5 tubing equip. 11/12/2019 11/12/2019 2.25 PROD1 PLUG PULD P POOH laying dwn 3.5 hydril 563 1,151.0 0.0 15:15 17:30 tubing, pup jt. BHKA disconnect tool, L/D 39 jts. 11/12/2019 11/12/2019 1.50 PROD1 PLUG RURD P Rig dwn GBR tubing running equip. & 0.0 0.0 17:30 19:00 1 1 1 13 1/2 equip., clean & rig floor 11/12/2019 11/12/2019 2.50 PROD1 PLUG OTHR P PJSM, Change saver sub on top drive 0.0 0.0 19:00 21:30 1 F/ XT - 39 T/ 4 1/2 IF, install bell guide Page 26152 Report Printed: 1/9/2020 Operations Summary (with Timelog Depths) C D4-594 Rig: DOYON 141 Job: DRILLING ORIGINAL Time Log Start Depth StartTime End Time our (hr) Phase Op Code Activity Code Time P-T-X Operation (ftKB) End Depth (ftKB) 11/12/2019 11/13/2019 2.50 PROD1 PLUG BHAH P P/U BHA # 4. 0.0 0.0 21:30 00:00 11/13/2019 11/13/2019 0.50 PROD1 PLUG BHAH P Finish picking up 8-3/4" intermediate 2 0.0 444.0 00:00 00:30 BHA to 444' MD. 11/13/2019 11/13/2019 0.75 PROD1 PLUG TRIP P TIH on 4" DP to 1930' MD. 444.0 1,930.0 00:30 01:15 11/13/2019 11/13/2019 0.75 PROD1 PLUG DHEQ P Shallow test MWD tools, @ 350 gpm, 1,930.0 1,930.0 01:15 02:00 624 psi, 30% flow, good. 11/13/2019 11/13/2019 4.00 PROD1 PLUG TRIP P TIH f/ 1930' - 8476' MD, P/U 105 K, 1,930.0 8,476.0 02:00 06:00 S/O 40 K. 11/13/2019 11/13/2019 2.50 PROD1 PLUG TRIP P Cont. RIH F/ 8476' T/ 9614,' P/U 110 8,476.0 9,614.0 06:00 08:30 K, S/0 wt 40K 11/13/2019 11/13/2019 0.75 PROD1 PLUG WASH P M/U XT-39 X 4.5" XO, Wash down F/ 9,614.0 9,750.0 08:30 09:15 9614' and tag cmt @ 9750'. spm 170, gpm 500, spp 3200, Flo 36% 11/13/2019 11/13/2019 2.75 PROD1 PLUG DRLG P Drill out cmt F/ 9750' T/ 10,053', spm 9,750.0 10,053.0 09:15 12:00 187, gpm 550, spp 33450, RPM 100, Trq 9 / 11 K, Flo 41 %, P/U wt 120 K, S/O wt 40 K 11/13/2019 11/13/2019 1.50 PROD1 PLUG DRLG P Drill out cmt F/10,053' T/ 10260' MD, 10,053.0 10,260.0 12:00 13:30 3455' TVD, spm 187, gpm 550, spp 3450, RPM 100, WOB 5/7 K, Trq 9 / 15 K, ROP 200 fph, Flo 41 %, P/U wt 120 K, S/O wt 40 K, 11/13/2019 11/13/2019 0.75 PROD1 PLUG DRLG P Drill out cmt F/10260' T/ 10,307'MD, 10,260.0 10,307.0 13:30 14:15 3455' TVD, spm 187, gpm 550, spp 3450, RPM 100, WOB 5/7 K, Trq 9 / 15 K, ROP 200 fph, Flo 41 %, P/U wt 122 K, S/O wt 40 K, 11/13/2019 11/13/2019 3.75 INTRM2 DRILL KOST P Kick off, Q 10,307' T/10419' md, 3455' 10,307.0 10,419.0 14:15 18:00 TVD, SPM 136, GPM 400, SPP 2220, RPM 100, Trq 9/11 K, ROP 30 fph, WOB 5/8K, P/Uwt 125 K, S/O wt 40 K, Flo 34%. 11/13/2019 11/13/2019 2.00 INTRM2 DRILL CIRC P Circulate, 2 BU, @ 10420', 500 GPM, 10,419.0 10,420.0 18:00 20:00 3400 SPP, 100 RPM, 10 k TRQ, P/U 125 K, S/0 40 K. 11/13/2019 11/13/2019 2.50 INTRM2 DRILL CIRC P Take SPR'S @ 10420', POOH F/ 10,420.0 10,420.0 20:00 22:30 10,420 T/ 10212',GPM 400, SPP 2600, RPM 50, Trq 10 K, RT WT 75K, unable to slack off, M/U TD and wrk pipe @ drilling perimeters. verify pipe free. 11/13/2019 11/13/2019 1.00 INTRM2 DRILL MPDA P Blow dwn Top Drive, OWFF F/ 15 10,420.0 10,420.0 22:30 23:30 min., pull riser, install MPD bearing. 11/13/2019 11/14/2019 0.50 INTRM2 DRILL WASH P Ream F/ 10212 T/ 10420, W/500 10,420.0 10,420.0 23:30 00:00 GPM, 3400 SPP, 100 RPM, 10 k TRQ, P/U 125 K, S/0 40 K. 11/14/2019 11/14/2019 0.50 INTRM2 DRILL REAM P Wash & ream F/10366 T/ 10420' W/ 10,366.0 10,420.0 00:00 00:30 500 gpm, 3350 spp, 50 rpms, 10K trq, 75K row 100 fph. 11/14/2019 11/14/2019 2.50 INTRM2 DRILL DISP P PJSM, Pump 40 bbl spacer, & 10,420.0 10,420.0 00:30 03:00 displace F/ 10.5 ppg LSND mud T/ 9.2 LSND mud @ 500 gpm, 1970 spp, 100 rpms, 4 K trq rot 75 K, 11/14/2019 11/14/2019 3.00 INTRM2 DRILL DDRL P Drill 8 3/4 Interm 2 hole F/ 1420' T/ 10,420.0 10,555.0 03:00 06:00 10,555' MD, TVD 3483', SPM 170, GPM 500, RPM 100, SPP 2000, TRQ 5 K, EC 11.3, P/U 100 K, S/O 50 K, ROT 75 K, - off bott trq 3K, SPP 1950, ADT .98, total bit hrs= 5.51, total Jar hrs = 65.69 Page 27/52 Report Printed: 1/9/2020 V Operations Summary (with Timelog Depths) CD4-594 ♦ ♦ 46s,. Rig: DOYON 141 Job: DRILLING ORIGINAL Time Log Start Depth Start Time End Time our (hr) Phase Op Code Activity Code Time P-T-X Operation (ftKB) End Depth (ftKB) 11/14/2019 11/14/2019 6.00 INTRM2 DRILL DDRL P Drill 8 3/4 Interm 2 hole F/10,555' T/ 10,555.0 10,978.0 06:00 12:00 10,978MD, TVD 3542', WOB 5/20 K, SPM 191, GPM 560, RPM 140, SPP 2400, TRQ 6/8 K, ECD 11.3, P/U 100 K, S/O 50 K, ROT 75 K, ROP 125 fph, - off bott trq 3-4K, SPP 2380, ADT .98, total bit hrs= 5.51, total Jar hrs = 65.69 11/14/2019 11/14/2019 6.00 INTRM2 DRILL DDRL P Drill 8 3/4 Interm 2 hole F/10,978 T/ 10,978.0 11,310.0 12:00 18:00 11310' MD, TVD 3625', WOB 7/8 K, SPM 190, GPM 560, RPM 140, SPP190, TRQ 6 K, ECD 11.22, P/U 107 K, S/O 60 K, ROT 83 K, ROP 125 fph, - off bott trq 3-4K, SPP 2350, ADT 4.04, total bit hrs= 13.28, total Jar hrs = 73.46 11/14/2019 11/15/2019 6.00 INTRM2 DRILL DDRL P Drill 8 3/4 Interm 2 hole F/11,310' T/ 11,310.0 11,870.0 18:00 00:00 11,870" MD, TVD 3639', WOB 4/7 K, SPM 192, GPM 560, RPM 160, SPP 2610, TRQ 6 K, ECD 11.2, P/U 115 K, S/O 63 K, ROT 89 K, ROP 99.3 fph, - off bott trq 5K, SPP 2580, ADT 4.52, total bit hrs= 17.80, total Jar hrs = 77.98 ( Back ream 30' @ 11,310' & lower ROP T/ 100 fph due tol spike in pump PSI) 11/15/2019 11/15/2019 4.50 INTRM2 DRILL DDRL P Drill 8 3/4 intermediate 2 hole 11,870.0 12,160.0 00:00 04:30 F/11,870' T/ 12,160' MD, TVD 3xxx', WOB 10 K, SPM 190, GPM 555, RPM 160, SPP 2850, TRQ 6'7 K, ECD 11.19, P/U 112 K, S/O 65 K, ROT 87 K, ROP 100 fph, - off bott trq 4K, SPP 2820, 11/15/2019 11/15/2019 0.50 INTRM2 DRILL EQRP T Circulate & reciprocate while trouble 12,160.0 12,160.0 04:30 05:00 shooting MPD software malfunction. 11/15/2019 11/15/2019 1.00 INTRM2 DRILL DDRL P Drill 8 3/4 intermediate 2 hole 12,160.0 12,191.0 05:00 06:00 F/12,160' T/ 12,191' MD, TVD 3705', WOB 10 K, SPM 190, GPM 560, RPM 160, SPP 2850, TRQ 6-7 K, ECD 11.19, P/U 112 K, S/O 65 K, ROT 87 K, ROP 100 fph, - off bottom Tq 4K, SPP 2820, Max gas 190, SCR @ 12259' MD, 3712' TVD, MW 9.3 ppg, 05:00 hrs. #1 25 = 540 psi @ 35 = 580 psi, MPD 240 #2 25 = 560 psi @ 35 = 628 psi, MPD 230 11/15/2019 11/15/2019 6.00 INTRM2 DRILL DDRL P Drill 8 3/4 intermediate 2 hole 12,191.0 12,579.0 06:00 12:00 F/12,191' T/ 12,579' MD, TVD 3760', WOB 5-10 K, SPM 190, GPM 560, RPM 160, SPP 3030, TRQ 6-8 K, ECD 11.4, P/U 110 K, S/O 68 K, ROT 88 K, ROP 100 fph, - off bottom Tq 5K, SPP 2990, Max gas 190, ADT 4.26, BIT 25.5, JARS 85.6. 11/15/2019 11/15/2019 5.00 INTRM2 DRILL DDRL P Drill 8 3/4 intermediate 2 hole 12,579.0 12,856.0 12:00 17:00 F/12,579' T/ 12856.MD, TVD 3788', WOB 2-5 K, SPM 190, GPM 555, RPM 160, SPP 2810, TRQ 6-8 K, ECD 11.32, P/U 115 K, S/O 70 K, ROT 90 K, ROP 100 fph, - off bottom Tq 5K, SPP 2990, Max gas 190, ADT 3.75, BIT 29.25, JARS 85.17 Page 28152 Report Printed: 1/9/2020 ...perations Summary (with Timelog L.,apths) CD4-594 Rig: DOYON 141 Job: DRILLING ORIGINAL Time Log Start Depth Start Time End Time Dur (hr) Phase Op Code Activity Code Time P-T-X Operation (ftKB) End Depth (ftKB) 11/15/2019 11/15/2019 0.25 INTRM2 DRILL OTHR T @ 12856' obsered PSI increase, & 12,856.0 12,856.0 17:00 17:15 pack off, lost returns, reduced pump rat T/ 23 gpm, stop rotation, P/U 1' off bottom. attempt to regain circulation, pressure increased T/ 950 psi, no returns, Work w/ packed off pipe. @ 12856' Attempt to regain circulation, P/U 127 K, no ability to S/O. Stop rotation start pumping out of hole. 11/15/2019 11/15/2019 2.75 INTRM2 DRILL OTHR T POOH F/ 12856' T/12258' attempt 12,856.0 12,258.0 17:15 20:00 T/ regain circulation starting at 23 GPM & 950 psi. PU 123 klb. ROT wt 75. No abilty to SO. 30 - 60 RPM, 13- 17 TQ. Attempt to regain circulation at varying depths, pumping 23 GPM & 870-940 psi. Monitoring MPD corialis meter for signs of returms. Open bypass for monitoring returns. No returns onserved. 11/15/2019 11/15/2019 2.00 INTRM2 DRILL OTHR T POOH f/ 12258 t/ 12182' MD. Pump 12,258.0 12,182.0 20:00 22:00 38 GPM / 910 PSI. 50 RPM / 6K TO. Pulling until returns observed at 12182'. 11/15/2019 11/16/2019 2.00 INTRM2 DRILL OTHR T Observed partial returns @ 12186' 12,182.0 12,182.0 22:00 00:00 MD. 0 RPM. Stage flow rate to 99 GPM / 460 psi. 8% F/O. PU and breakover wt at 125K. Stage flow rate up to 148 GPM / 560 psi / 17% F/O. Begin rotating pipe at 5 RPM. 3-4K TQ. Continue staging pumps up to 220 GPM / 805 psi / 24% F/O. 111 BBL total losses. No losses after regaining circulation. 11/16/2019 11/16/2019 3.00 INTRM2 DRILL CIRC T Continue, circulating & Rotating, 12,182.0 12,182.0 00:00 03:00 staging flow rate & rotary up, T/ 455 gpm, 2134 spp, flow 34%, lost 2 bbls to hole after regaining returns t/ pits. 11/16/2019 11/16/2019 0.50 INTRM2 DRILL CIRC T Line up returns through MPD Coriolis 12,182.0 12,182.0 03:00 03:30 choke meter. cont. staging up pump rte T/ 500 gpm, flo out, 2460 spp, 125 rpms, 5 k trq, ROW 87K. 11/16/2019 11/16/2019 1.50 INTRM2 DRILL CIRC T Reduce flow rate, pump 27 bbl hi vis 12,182.0 12,208.0 03:30 05:00 NPM sweep @ 12208', Recipercate pipe & increase flow rate T/ 500 gpm out, 2460 spp, 125 rpms, 5 k trq. @ 250 fph. 11/16/2019 11/16/2019 1.00 INTRM2 DRILL REAM T Wash & ream@ 250 fph, F/ 12,208' T/ 12,208.0 12,350.0 05:00 06:00 12,350' @ 500 gpm, 2460 spp, 125 rpms, 5 k trq, P/U 113, S/O 67 k, ROW 87k. 11/16/2019 11/16/2019 4.25 INTRM2 DRILL REAM T Wash & ream @ 250 fph, F/12,350' T/ 12,350.0 12,856.0 06:00 10:15 12856' @ 500 gpm, 2900 - 3100 spp, 120 rpms, 5 k trq, P/U 113, S/O 67 k, ROW 87 k. pump 90 bbl nut plug sweep @ 12828' 11/16/2019 11/16/2019 1.75 INTRM2 DRILL DDRL P Drill F/ 12,856' T/ 12,923' MD, 3799' 12,856.0 12,923.0 10:15 12:00 TVD, W/ 560 gpm, 3100 spp, 120 rpm, 6-8 trq 5-8 wob, p/u 113k, s/o 67k, rot 92k, 11.5 ECD, off bot trq 4k, off bot spp 3010, ADT hrs 1.43, bit hrs 30.68, jar hrs 90.86 Page 29/52 Report Printed: 1/9/2020 Operations Summary (with Timelog Depths) C D4-594 • s' Rig: DOYON 141 Job: DRILLING ORIGINAL Time Log Start Depth StartTime End Time Dur (hr) Phase Op Code Activity Code Time P-T-X Operation (ftKB) End Depth (ftKB) 11/16/2019 11/16/2019 6.00 INTRM2 DRILL DDRL P Drill F/ 12,923' T/13213' MD„ W/ 560 12,923.0 13,210.0 12:00 18:00 gpm, 3000 spp, 120 rpm, 6-8 trq 5-8 wob, P/U 113k, S/O 70 k, ROT 92 k, Rop 82 FPH, holding 11.5 ECD W/ MPD on connections, off bot trq 4k, off bot spp 3010, ADT hrs 1.43, bit hrs 30.68, jar hrs 90.86 11/16/2019 11/17/2019 6.00 INTRM2 DRILL DDRL P Drill F/ 13213' T/ 13582' MD, 13,210.0 13,582.0 18:00 00:00 3884'TVD W/ 560 gpm, 3000 spp, 120 rpm, 6-8 trq 5-8 wob, P/U 116 Kk, S/O 69 k, ROT 91 k, 11.5 ECD, ROP 80 FPH. off bot trq 4k, off bot spp 3010, ADT hrs 5.17, bit hrs 40.65, jar hrs 100.83 Entered top of K-3 formation@ 13445' MD 3866' TVD 11/17/2019 11/17/2019 6.00 INTRM2 DRILL DDRL P Cont. Drilling 8 3/4 INTRM 2 section, 13,582.0 13,900.0 00:00 06:00 F/ 13582' T/ 13900' MD, 3924 TVD, wob 5/10 k, rpm 120, spm 191, gpm 560, spp 2940 trq 6-8 k, ECD 11.5, p/u 115 k, s/o 69 k, rot 91 k, max gas 300, ADT 4.58 - bit hrs 45.23, jar hrs 105.41 (275 bbl dilution @ 13775' ) 11/17/2019 11/17/2019 6.00 INTRM2 DRILL DDRL P Cont. Drilling 8 3/4 INTRM 2 section, 13,900.0 14,312.0 06:00 12:00 F/13900' T/ 14312' MD, 3990' TVD, wob 5/10 k, rpm 120, spm 191, gpm 560, spp 2970, off bot. 2880, trq 7-8 k, off bot 5 k, ECD 11.65, p/u 115 k, s/o 73 k, rot 93 k, max gas 189, ADT 5.09 - bit hrs 50.32, jar hrs 110.5 11/17/2019 11/17/2019 6.00 INTRM2 DRILL DDRL P Cont. Drilling 8 3/4 INTRM 2 section, 14,312.0 14,775.0 12:00 18:00 F/ 14312' T/ 14,775' MD, 4060' TVD, wob 5/10 k, rpm 120, spm 191, gpm 560, spp 2970, off bot. 2880, trq 7-8 k, off bot 5 k, ECD 11.65, p/u 115 k, s/o 73 k, rot 93 k, ADT 4.41 - bit hrs 54.73, jar hrs 114.91 11/17/2019 11/17/2019 2.50 INTRM2 CASING CIRC P Circulate 2 bottoms up stand back 1 14,775.0 14,775.0 18:00 20:30 std per curlation, rpm 120, spm 191, gpm 560, spp 2970, off bot. 2880, trq 7-8 k, off bot 5 k, ECD 11.65, p/u 115 k, s/o 73 k, rot 93 k, max gas 189, ADT 5.09 - bit hrs 50.32, jar hrs 110.5 11/17/2019 11/18/2019 3.50 INTRM2 CASING CIRC P Increase mud wt F/ 9.2 T/ 10 ppg, W/ 14,775.0 14,775.0 20:30 00:00 11.5 ppg spike fluid, rpm 120, spm 191, gpm 560, spp 2970, off bot. 2880, trq 7-8 k, off bot 5 k, ECD 11.65, p/u 115 k, s/o 73 k, rot 93 k, max gas 189, ADT 5.09 - bit hrs 50.32, jar hrs 110.5 11/18/2019 11/18/2019 1.00 INTRM2 CASING CIRC P Cont. To increase mud wt F/ 9.2 T/ 10 14,775.0 14,775.0 00:00 01:00 ppg, W/ 11.5 ppg spike fluid, While maintaining 11.0 ppg ECD W/ MPD, rpm 120, spm 191, gpm 485, spp 2600, trq 5 k, ECD 11.76, P/U 120 k, S/O 75 k, ROT 98 k 11/18/2019 11/18/2019 1.75 INTRM2 CASING CIRC P Line up MPD To pump across top of 14,775.0 14,775.0 01:00 02:45 hole. Pump 110 bbls of 11 ppg LCM Proactive pill, chasing w/ 87 bbls of 10.0 ppg LSND mud, 11/18/2019 11/18/2019 3.25 INTRM2 CASING PMPO P Pump out of hole spotting Proactive 14,775.0 13,340.0 02:45 06:00 pill @ 1 bpm @ 740 psi, @ 1175 FPH,- F/14775 T/ 13440' @ top of K3 formation. P/U 120 - 125 K, Page 30/52 Report Printed: 1/9/2020 Operations Summary (with Timelog uepths) C D4-594 Rig: DOYON 141 Job: DRILLING ORIGINAL Time Log Start Depth Start Time End Time Dur (hr) Phase Op Code Activity Code Time P-T-X Operation (ftKB) End Depth (ftKB) 11/18/2019 11/18/2019 3.00 INTRM2 CASING BKRM P BROOH F 13440 T/ 13210', W 550 13,340.0 13,210.0 06:00 09:00 gpm, 3230 SPP, 100 RPM, 5/6 K TRQ, ECD 11.9, P/U 93K 11/18/2019 11/18/2019 0.50 INTRM2 CASING FIT P Perform Dynamic FIT test to 12.9 ppg, 13,210.0 13,210.0 09:00 09:30 W/ MPD @ 13210', GPM 560, rpm 20, TRQ 3 / 4 K. 11/18/2019 11/18/2019 2.50 INTRM2 CASING BKRM P Cont. BROOH F/ 13,210' T/ 12,545' 13,210.0 12,545.0 09:30 12:00 W/ 560 gpm, 120 RPM, 3200 SPP, ECD 11.8, TRQ 5/6 K, MW 10.0 ppg, P/U 93 K 11/18/2019 11/18/2019 6.00 INTRM2 CASING BKRM P Cont. BROOH F/12,545' T/ 11,032', 12,545.0 11,032.0 12:00 18:00 W/ 560 gpm, 120 RPM, 3220 SPP, ECD 11.8, TRQ 5/6 K, MW 10.0 ppg, Flow out, 558' ROT 85 K, P/U 85 K, 11/18/2019 11/18/2019 3.50 INTRM2 CASING BKRM P Cont. BROOH F/ 11,032' T/10,253 , 11,032.0 10,253.0 18:00 21:30 @ 700 FPH, W/ 560 gpm, 120 RPM, 3220 SPP, ECD 11.8, TRQ 5/6 K, MW 10.0 ppg, Flow out, 558' ROT 85 K, P/U 85 K, ( Ratty @ 11530' to 1151 T) 11/18/2019 11/18/2019 1.00 INTRM2 CASING CIRC P Circulate, & reciprocate, mataining 10,253.0 10,253.0 21:30 22:30 11.0 ppg, ECD. until shakers clean up, W/ 556 gpm, Flow out 545, 3140 SPP, 80 rpms, 4 k trq, ROW 75K 11/18/2019 11/18/2019 1.00 INTRM2 CASING OWFF P B/D Top Drive, Flow check well 10,253.0 10,253.0 22:30 23:30 trapping 11.0 ppg ECD, W/ MPD. monitoring shut in Pressure. 40 psi, drop in static psi in 30 min. Drop 2.41 drift 11/18/2019 11/19/2019 0.50 INTRM2 CASING BKRM P Cont. BROOH F/10253' T/10085', W/ 10,253.0 10,085.0 23:30 00:00 560 gpm, 120 RPM, 3220 SPP, ECD 11.5, TRQ 5/6 K, MW 10.0 ppg, Flow out, 558' ROT 85 K, P/U 85 K, 11/19/2019 11/19/2019 1.00 INTRM2 CASING BKRM P Cont. To Brooh @700/800 FPH as 10,085.0 9,804.0 00:00 01:00 Ecd'sAllow, Maintaning 11.0 PPG ECD W/MPD. F/10,085' to 9,804', @ 3140 PSI, 545 GPM,FIow Out, 11.49 PPG ECD,80 Rpm's, 4K TQ, ROW=73K. 11/19/2019 11/19/2019 2.00 INTRM2 CASING BKRM P Cont. To Brooh @700/800 FPH as 9,804.0 9,677.0 01:00 03:00 Ecd's Allow, Mainta ning 11.0 PPG ECD W/MPD. F/10,085' to 9,804', @ 3140 PSI, 545 GPM,FIow Out, 11.49 PPG ECD,80 Rpm's, 4K TQ, ROW=73K. 11/19/2019 11/19/2019 1.00 INTRM2 CASING MPDA P Ramp Down Pumps Trapping 11.5 9,677.0 9,677.0 03:00 04:00 PPg ECD Equivalent,Blow Down Top,Line Up the pump down the Kill line,equalize pressure Across Kill Hcr, & Open Hcr And Monitor,Close the Annular & Reduce The Closing Pressure< Open The Mpd Chokes,Bleed off the Psi, Close The Mpd Chokes & Verify That The Annular Psi Is Not Bleeding By, Reopen The Mpd Chokes And Strip The Last Stand Of 5" D.P. To The Rig Floor. 11/19/2019 11/19/2019 2.00 INTRM2 CASING OTHR P Maintain 11.PPG Ecd W/290/330 9,677.0 9,677.0 04:00 06:00 ECD. Withethe pump Lined up On the Kill Line While changing The Saver Sub F/ 4 1/2" IF to4" XT 39 And Change to The 4" Elevator's 11/19/2019 11/19/2019 1.00 INTRM2 CASING MPDA P PJSM Pull the 5" RCD Head & Install 9,677.0 9,677.0 06:00 07:00 the 4" RCD Page 31/52 Report Printed: 1/9/2020 I AL Operations Summary (with Timelog Vepths) C D4-594 Rig: DOYON 141 Job: DRILLING ORIGINAL Time Log Start Depth Start Time End Time Dur (hr) Phase Op Code Activity Code Time P-T-X Operation (ftKB) End Depth (ftKB) 11/19/2019 11/19/2019 0.25 INTRM2 CASING MPDA P Line up the MPD Equipment to 9,677.0 9,677.0 07:00 07:15 SOOH,Equalize the the pressure between the Annulus & the Mpd Equipment- (300 Psi), And open the annular. 11/19/2019 11/19/2019 4.75 INTRM2 CASING STRP P SOOH F/9,613'; to 5,550' Holding 11.5 9,677.0 5,550.0 07:15 12:00 PPG EMW with/ MPD While pulling the Pipe & in the Slips. 11/19/2019 11/19/2019 1.50 INTRM2 CASING CIRC P At 5,550' Line up And Pump 56 BBIs 5,550.0 5,550.0 12:00 13:30 Of Hi-Vis Spacer To the Bit. 11/19/2019 11/19/2019 1.50 INTRM2 CASING TRIP P Pooh F/5,550' to 4,794' Laying in the 5,550.0 4,794.0 13:30 15:00 Hi Vis Spacer 750' W/ 1 BBL Pr/Min @ 680Psi 11/19/2019 11/19/2019 0.50 INTRM2 CASING OTHR P Blow Down the Top Drive Down, Put 4,794.0 4,794.0 15:00 15:30 11.4 PPg Of Lsnd in the Mud Tank To Displace with. 11/19/2019 11/19/2019 2.00 INTRM2 CASING CIRC P @ 4,794' PJSM & Displace to /11.4 4,794.0 4,794.0 15:30 17:30 PPG LSND W/ 6BBL/MIN Rot And Recip 60 Rpm 2K TQ.FCP-380 PSI & 4BBLS/Min 11/19/2019 11/19/2019 0.50 INTRM2 CASING OWFF P Flow Check the Well F/ 30 Min's, No 4,794.0 4,794.0 17:30 18:00 Flow. 11/19/2019 11/19/2019 1.50 INTRM2 CASING MPDA P Pull the Rcd Element & Install the 4,794.0 4,794.0 18:00 19:30 Flow Nipple. Inspect the Air Boot's. 11/19/2019 11/19/2019 2.00 INTRM2 CASING TRIP P Tooh F/4,794' to T444' monitor the well 4,794.0 444.0 19:30 21:30 with the Trip Tank. PUW=70k SOW=60K 11/19/2019 11/19/2019 0.50 INTRM2 CASING OWFF P Flow Check Before Pulling the BHA, 444.0 444.0 21:30 22:00 No Flow Observed, Remove the air Slips and the Stripping Rubber. 11/19/2019 11/20/2019 2.00 INTRM2 CASING PULD P Laydown the directional Bha,Pull the 444.0 0.0 22:00 00:00 source. 11/20/2019 11/20/2019 1.00 INTRM2 CASING BHAH P Continue to lay down BHA 4. 0.0 0.0 00:00 01:00 11/20/2019 11/20/2019 1.00 INTRM2 CASING BHAH P Clear & clean rig floor. Lay down lift 0.0 0.0 01:00 02:00 subs, XO's, & BHA. 11/20/2019 11/20/2019 2.00 INTRM2 CASING RURD P Drain stack, change out upper rams to 0.0 0.0 02:00 04:00 7" solid body. SIMOPS replace discharge shock hose to mud pumps. 11/20/2019 11/20/2019 0.50 INTRM2 CASING SEQP P Pressure test new shock hose on mud 0.0 0.0 04:00 04:30 pump to the rig floor. 11/20/2019 11/20/2019 1.50 INTRM2 CASING WWWH P Make up removal tool, remove wear 0.0 0.0 04:30 06:00 bushing, make up stack washing tool. Wash stack & wellhead. Lay down the wash tool. 11/20/2019 11/20/2019 1.75 INTRM2 CASING RURD P Blow Down the Top Drive,P/U the 0.0 0.0 06:00 07:45 7"Test Joint,Make up the XO & Head Pin To the test JT.& R/U to Test the 7" Solid Body Pipe Rams. 11/20/2019 11/20/2019 1.25 INTRM2 CASING PRTS P Pressure Test the Annular & The & 7" 0.0 0.0 07:45 09:00 Pipe Rams.With the 7" Test Joint, Test to 250Psi F 5 Mins & test to 3500 Psi F/ Mins.Test Held Good. 11/20/2019 11/20/2019 0.50 INTRM2 CASING RURD P Rig Down the Testing 0.0 0.0 09:00 09:30 Equipment, Laydown the 7" Test Joint And Pull the Test Plug. 11/20/2019 11/20/2019 0.25 INTRM2 CASING RURD P P/U and set the wear ring,the wear 0.0 0.0 09:30 09:45 Ring ID is 8.812. 11/20/2019 11/20/2019 1.75 INTRM2 CASING PULD P PJSM Rig up and Laydown 36 JTS of 0.0 0.0 09:45 11:30 1 1 1 15" Drill Pipe. 11/20/2019 11/20/2019 5.50 INTRM2 CASING PULD P PJSM Rig up to P/U" HWDP, P/U 29 0.0 0.0 11:30 17:00 Stands of 4" HWDP Page 32/52 Report Printed: 1/9/2020 Uperations Summary (with Timelog vepths) CD4-594 r'• s' Rig: DOYON 141 Job: DRILLING ORIGINAL Time Log Start Depth Start Time End Time Dur (hr) Phase Op Code Activity Code Time P-T-X Operation (ftKB) End Depth (ftKB) 11/20/2019 11/20/2019 1.00 INTRM2 CASING OTHR P Change Out The Saver Sub F/ 4" XT- 0.0 0.0 17:00 18:00 39 to 4 1 /2" IF 11/20/2019 11/20/2019 1.00 INTRM2 CASING RURD P RU CRT and handling equipment. 0.0 0.0 18:00 19:00 Begin running 7" liner. 11/20/2019 11/21/2019 5.00 INTRM2 CASING PUTB P PSJM, MU shoe track, break 0.0 2,150.0 19:00 00:00 circulation, check floats, RIH at 2,500 ft/hrwith 7" casing to 2,150' MD. 11/21/2019 11/21/2019 6.00 INTRM2 CASING PUTB P PSJM, RIH With The 26# L-80 7" 538.0 2,344.0 00:00 06:00 casing @ 2500 FPH F/528' To 2,344' Filling the Pipe on The Run, And On every 10th Joint Fill The Pipe Completly. SOW= 77K. 11/21/2019 11/21/2019 6.00 INTRM2 CASING PUTB P RIH With The 26# L-80 7" casing @ 2,344.0 3,991.0 06:00 12:00 2500 FPH F/2,3447o 3,991' Filling the Pipe on The Run, And On every 10th Joint Fill The Pipe Completly. SOW= 80K. 11/21/2019 11/21/2019 1.75 INTRM2 CASING PUTB P RIH With The 26# L-80 7" casing @ 3,991.0 4,657.0 12:00 13:45 2000 FPH F/3,991' To 4,657' Filling the Pipe on The Run, And On every 10th Joint Fill The Pipe Completly. P/U= 83K SOW=75K. 11/21/2019 11/21/2019 1.00 INTRM2 CASING RURD P R/D 7" CRT Tool & The Handling 4,657.0 4,657.0 13:45 14:45 Tool's, And R/U GBR PWR Tongs. 11/21/2019 11/21/2019 1.75 INTRM2 CASING RUNL P P/U & M/U Pup Joints, BKR ZXP LNR 4,657.0 4,811.0 14:45 16:30 PKR, 1 Stand Of 4" D.P. RIH F/4657' to 4,811' PUW=90K, SOW=70K 11/21/2019 11/21/2019 1.50 INTRM2 CASING OTHR P PJSM & C/O The Saver Sub T/ 4" XT- 4,811.0 4,811.0 16:30 18:00 39 11/21/2019 11/21/2019 0.50 INTRM2 CASING OTHR P Finish Re -Installing the Bell Guide & 4,811.0 4,811.0 18:00 18:30 Tie Wire the Bolts. 11/21/2019 11/21/2019 0.50 INTRM2 CASING MPDA P PJSM, Remove the Riser, And Install 4,811.0 4,811.0 18:30 19:00 the 4" RCD Bearing W/MPD Advisor. 11/21/2019 11/21/2019 3.00 INTRM2 CASING CIRC P Displace the 11 APPG Annulus with 4,811.0 4,811.0 19:00 22:00 10.OPPG @ 50 GPM, While Maintaining 11 PPG ECD With the MPD Chokes. 11/21/2019 11/21/2019 1.50 INTRM2 CASING CIRC T Line up To pump Across the top of the 4,811.0 4,811.0 22:00 23:30 Hole, Experienced Issues with The MPD'S Choke HPU unit Not Funtioning Correctly, Line up and pump Down the Drill Pipe Also To Keep the Stand pipe from Freezing up Trouble shooting the Hpu Unit. 11/21/2019 11/22/2019 0.50 INTRM2 CASING RUNL P Continue. RIH F/4811'to 5,075' With 4,811.0 5,075.0 23:30 00:00 The 26# L-80 7" Casing On The 4" Drill Pipe Out Of the Derrick @ 2500 FPH, SOW=65K While Pumping Across theTop of the Hole. Regulating The Back Pressure Manually. 11/22/2019 11/22/2019 1.50 INTRM2 CASING RUNL P Continue. RIH F/ 5,018' To 5,660' With 5,075.0 5,660.0 00:00 01:30 The 26# L-80 7" Casing On The 4" Drill Pipe Out Of the Derrick @ 2500 FPH, SOW=60K 11/22/2019 11/22/2019 3.50 INTRM2 CASING RUNL P Rotate The Casing F/10 mins @ 10 5,660.0 5,660.0 01:30 05:00 Rpm's with 4k TQ, Rotate the Casing F/10 Mins @ 20 Rpm's 5K TQ. Rotating the Casing Went well With No Trouble's. 11/22/2019 11/22/2019 1.00 INTRM2 CASING RUNL P Continue. RIH F/ 5,660' To 6,794' With 5,660.0 6,794.0 05:00 06:00 The 26# L-80 7" Casing On The 4" Drill Pipe Out Of the Derrick @ 2500 FPH, SOW=35K Page 33/52 Report Printed: 1/9/2020 Uperations Summary (with Timelog L epths) C D4-594 Rig: DOYON 141 Job: DRILLING ORIGINAL Time Log Start Depth Start Time End Time Dur (hr) Phase Op Code Activity Code Time P-T-X Operation (ftKB) End Depth (ftKB) 11/22/2019 11/22/2019 0.25 INTRM2 CASING RUNL P Continue. RIH F/6,794' to 7,077' With 6,794.0 7,077.0 06:00 06:15 The 26# L-80 7" Casing On The 4" Drill Pipe Out Of the Derrick @ 2500 FPH, SOW=35K 11/22/2019 11/22/2019 3.25 INTRM2 CASING CIRC P @ 7,077' CBU & Staged Up Pump. 7,077.0 7,077.0 06:15 09:30 T/60 GPM ICP=430 PSI FCP=275. 11/22/2019 11/22/2019 2.50 INTRM2 CASING RUNL P Continue. RIH F/7,077' To 8,307' With 7,077.0 8,307.0 09:30 12:00 The 26# L-80 7" Casing On The 4" Drill Pipe Out Of the Derrick @ 2000 FPH, SOW=33K 11/22/2019 11/22/2019 5.50 INTRM2 CASING RUNL P Wash Down The 7" Liner on The 4" 8,307.0 10,386.0 12:00 17:30 D.P.F/8,307' to 10,386' W/50 GPM @ 470 PSI. Parameter's @ the Casing Shoe P/U 107K, SO 45K, ROT 75K, 10RPM TQ 6-7K,20 RPM TQ 6-7K. 11/22/2019 11/22/2019 0.50 INTRM2 CASING RUNL P Continue. RIH F/10,386'to 10,764' 10,386.0 10,764.0 17:30 18:00 With The 26# L-80 7" Casing On The 4" Drill Pipe Out Of the Derrick @ 500/700 FPH, SOW=45K Running 4 stands in the Hole And Wash the 5th Stand down. 11/22/2019 11/23/2019 6.00 INTRM2 CASING RUNL P Continue. RIH F/10,764'to 12,515' 10,764.0 12,515.0 18:00 00:00 With The 26# L-80 7" Casing On The 4" Drill Pipe Out Of the Derrick @ 500/700 FPH, SOW=45K Running 4 stands in the Hole And Washing the 5th Stand down. 11/23/2019 11/23/2019 5.00 INTRM2 CASING RUNL P Continue. RIH F/' 12,515' To 13,643' 12,515.0 13,643.0 00:00 05:00 With The 26# L-80 7" Casing On The 4" HWDP Out Of the Derrick. PUW=130k, SOW=65K. 11/23/2019 11/23/2019 1.00 INTRM2 CASING RUNL P Wash Down F/13,643'to 13,734, 13,643.0 13,734.0 05:00 06:00 Staging the pump uo to 60 GPM, GPM=20 Is 500 Psi, GPM =40 Is 590 Psi, 60 GPM= 630Psi. 11/23/2019 11/23/2019 5.00 INTRM2 CASING CIRC P @ 13,734' CBU Staging the Pump up 13,734.0 13,734.0 06:00 11:00 To 126 GPM @ 690 Psi, @ 60 GPM=590 Psi. 11/23/2019 11/23/2019 1.00 INTRM2 CASING RUNL P Continue. RIH F/' 13,743'to 14,287' 13,734.0 14,287.0 11:00 12:00 With The 26# L-80 7" Casing On The 4" HWDP Out Of the Derrick. PUW=130k, SOW=65K. 11/23/2019 11/23/2019 4.00 INTRM2 CASING CIRC P @ 14,287" CBU Staging the Pump up 14,287.0 14,287.0 12:00 16:00 To 120 GPM @ 690 Psi, 11/23/2019 11/23/2019 2.00 INTRM2 CASING RUNL P Continue. RIH F/'14,287'to 14,775' 14,287.0 14,775.0 16:00 18:00 With The 26# L-80 7" Casing On The 4" HWDP Out Of the Derrick. PUW=165k, SOW=70K. Tagged BTTM Right on Depth @ 14,775'.. 11/23/2019 11/24/2019 6.00 INTRM2 CEMENT CIRC P @ 14,775" CBU Staging the Pump up 14,775.0 14,775.0 18:00 00:00 To 170 GPM @ 920 Psi,Rotate @ 20 RPM'S Also. Laydown the 5" Drill Pipe While were Circulating. 11/24/2019 11/24/2019 0.50 INTRM2 CEMENT CIRC P Continue Circ @ 14,775" CBU @ 170 14,775.0 14,775.0 00:00 00:30 GPM @ 920 Psi,Rotate @ 20 RPM'S Also. Laydown the 5" Drill Pipe While were Circulating. 11/24/2019 11/24/2019 2.00 INTRM2 CEMENT CMNT P PJSM, M/U The Baker Cementing 14,775.0 14,775.0 00:30 02:30 Head, And Hose's, Blow Air Thru baker's Cementing Line's. the lines were all Clear. Page 34/52 Report Printed: 1/9/2020 Operations Summary (with Timelog IJepths) CD4-594 Rig: DOYON 141 Job: DRILLING ORIGINAL Time Log Start Time End Time Dur (hr) Phase Op Code Activity Code Time P-T-X Operation Start Depth (ftKB) End Depth (ftKB) 11/24/2019 11/24/2019 3.75 INTRM2 CEMENT CMNT P Hold a PJSM, pressure test 14,775.0 14,775.0 02:30 06:15 Sclumberger Line's to 4500 psi Test Held Good, Pump 40 bbls of 12 ppg Mud Push,Drop the Bottom Dart,Batch and Pump 81 bbls 13 PPG of Lead cement,Pump 23 bbls of class G cmt 15.78 PPG Tail Cement, Observed the Latch in of the Bottom Plug Dart @ 15 bbls of tail Cement Pumped, Drop The Top Dart, Pump 10 bbls of Fresh water,pump the Displacement with the rig Pumps @ 4 Bpm Psi=950, Observed the latch of the top Plug dart @ 1152 STKS, Slow the pump to 2 bbls per min @ 3500 STKS Pumped,Bump the plug @ 3657 Stks Pumped, Pressure up to 2800 Psi, Hold for 5 mins And Bleed the Pressure of Open the Cement Line and Check the Floats and the Floats Held Good. 11/24/2019 11/24/2019 1.00 INTRM2 CEMENT PRTS P Pressure up to 4000 Psi To set the 14,775.0 14,775.0 06:15 07:15 ZXPLiner Hanger & The Packer Per The Baker Rep,Bleed the Pressure off and Pick up to Expose the Dog Sub, Set Down To 60K to Verify Setting of the Hanger, Rot @ 20 RPM With (4- 5K Tq) & Set 60 K Down with ( 13K Tq ). The top Of the Liner Is Set @ 10,059' 11/24/2019 11/24/2019 0.25 INTRM2 CEMENT CIRC P Roll the pump @ 84 GPM & Pooh to 14,775.0 14,775.0 07:15 07:30 10,040' to pull the Liner Running tool, out of the Liner Top to Flush The Liner Top,And circ 1000 Stks. 11/24/2019 11/24/2019 1.50 INTRM2 CEMENT RURD P @ 10,040' Blow Down the Cement 14,775.0 10,040.0 07:30 09:00 lines & Laydown the the Baker Cementing Swivel, Break out The XO Sub's From the Cementing Swivel, and Laydown the Cementing Swivel. 11/24/2019 11/24/2019 1.50 INTRM2 CEMENT CIRC P @ 10,040' CBU With 435 GPM @ 10,040.0 10,040.0 09:00 10:30 2475 Psi, At 20 RPM With 4- 5kTq,Simops Move the 5" Drill Pipe In the Derrick to Prep For Laying Down the Drill Pipe. 11/24/2019 11/24/2019 0.50 INTRM2 CEMENT TRIP P POOH F/10,040' to 9,978' L/D 2 Joints 10,040.0 9,978.0 10:30 11:00 Of HWDP P/U Wt 120K. 11/24/2019 11/24/2019 1.00 INTRM2 CEMENT MPDA P PJSM & Pull the Rcd Head & Install 9,978.0 9,978.0 11:00 12:00 the trip nipple. 11/24/2019 11/24/2019 0.25 INTRM2 CEMENT TRIP P Pooh F/ 9,978' to 9,666' P/U WT 120k 9,978.0 9,666.0 12:00 12:15 11/24/2019 11/24/2019 0.75 INTRM2 CEMENT PRTS P At 9,666' pressure test the liner top to 9,666.0 9,666.0 12:15 13:00 1000 Psi and the Test was Charted. 11/24/2019 11/24/2019 6.00 INTRM2 CEMENT TRIP P Pooh F/ 9,666' to Surface with the 9,666.0 0.0 13:00 19:00 Baker Liner Setting tool. 11/24/2019 11/24/2019 0.50 INTRM2 CEMENT PULD P LayDown the Liner Running tool, 0.0 0.0 19:00 19:30 everything looked Good on the setting tool.' 11/24/2019 11/24/2019 0.50 INTRM2 EVALWB ELOG P Clean and Clear the rig Floor 0.0 0.0 19:30 20:00 11/24/2019 11/24/2019 2.00 INTRM2 EVALWB ELOG P PJSM Rig up the Wireline tools. 0.0 0.0 20:00 22:00 11/24/2019 11/25/2019 2.00 INTRM2 EVALWB ELOG P Run in the hole W/ the Wireline cast 0.0 0.0 22:00 00:00 Logs. Page 35/52 Report Printed: 1/9/2020 tiperations Summary (with Timelog Lapths) CD4-594 Rig: DOYON 141 Job: DRILLING ORIGINAL Time Log Start Depth StartTime End Time Dur (hr) Phase Op Code Activity Code Time P-T-X Operation (ftKB) End Depth (ftKB) 11/25/2019 11/25/2019 1.00 INTRM2 EVALWB ELOG P Continue RIH W/ Wireline cast M 2,650.0 6,300.0 00:00 01:00 Logging Tools F/2,650' to 6,300' MD. 11/25/2019 11/25/2019 4.50 INTRM2 EVALWB ELOG P Run the Cast M Logs on The Welltec 6,300.0 0.0 01:00 05:30 Tractor F/6,300' to Surface. 11/25/2019 11/25/2019 1.50 INTRM2 EVALWB ELOG P Rig Down the wireline Tools. 0.0 0.0 05:30 07:00 11/25/2019 11/25/2019 1.50 INTRM2 CSGRCY BOPE P PJSM Change out the top Pipe Rams 0.0 0.0 07:00 08:30 From 7" Casing Rams to 9 5/8" Casing Rams. 11/25/2019 11/25/2019 0.50 INTRM2 CSGRCY SVRG P Service the rig and the top & the ST- 0.0 0.0 08:30 09:00 80. 11/25/2019 11/25/2019 1.00 INTRM2 CSGRCY WWWH P Make Up the Stack washer and wash 0.0 0.0 09:00 10:00 the Bope out W/600 GPM @ 60 Psi. 11/25/2019 11/25/2019 0.75 INTRM2 CSGRCY WWSP P Pick up the Wear Ring Puller & Pull 0.0 0.0 10:00 10:45 the wear Ring. 11/25/2019 11/25/2019 1.25 INTRM2 CSGRCY RURD P Blow Down the top drive.P/U The Test 0.0 0.0 10:45 12:00 joint & M/U The Test Plug,Set the plugRig Up to test The Bope,Fill the Surface Lines with Fresh water,And purge The Lines. 11/25/2019 11/25/2019 6.00 INTRM2 WHDBOP BOPE P Test BOP'S @ 250/ 3500 psi F/ 5 min 0.0 0.0 12:00 18:00 ea. Tested with 9 5/8 & 4" test jts. tested 3 1/2' X 6' VBR rams, kill line, HCR, upper IBOP, kanual kill valve, lower IBOP,1-14 choke valves, choke HCR, blind rams, perfor accumlator Test - system pressure 3000 psi, after closing 1500 psi, 33 sec F/ 200 spi increase, 162 sec. for full charge, 5 nitrogen bottles = 1875 psi. The IBOP Wouldn't Test. 11/25/2019 11/26/2019 6.00 INTRM2 WHDBOP BOPE T The upper IBOP failed we changed it 0.0 0.0 18:00 00:00 out and retested ok. Performed draw down on Manual and Super choke 1800 psi. Time line 12:00-18:00 Tested Bop's 18:00-18:15 RD test equipment. 18:15-20:30 Change out IBOP. 20:30-20:45 R/U test equip. 20:45-21:15 retest IBOP Spare IBOP failed. 21:15-00:00 Change out IBOP. 00:00-00:15 R/U test equip. 00:15- 00:45 retest IBOP OK. 11/26/2019 11/26/2019 0.50 INTRM2 CSGRCY BOPE P RU test equipment and test IBOP 0.0 0.0 00:00 00:30 11/26/2019 11/26/2019 1.50 INTRM2 CSGRCY RURD P Install, torque and wiretie torque rings 0.0 0.0 00:30 02:00 and bell guide 11/26/2019 11/26/2019 1.00 INTRM2 CSGRCY SLPC P PJSM, Slip and cut drilling line 0.0 0.0 02:00 03:00 11/26/2019 11/26/2019 0.50 INTRM2 CSGRCY SVRG P Service blocks and top drive 0.0 0.0 03:00 03:30 11/26/2019 11/26/2019 0.50 INTRM2 CSGRCY MPSP P Pull test plug and drain stack 0.0 0.0 03:30 04:00 11/26/2019 11/26/2019 0.50 INTRM2 CSGRCY PRTS P PJSM, test hardline toThe Choke 0.0 0.0 04:00 04:30 Manifold to the tiger tank to 1,000 psi. Test successful. 11/26/2019 11/26/2019 1.00 INTRM2 CSGRCY PULL P MU spear assembly. RIH and engage 2,670.0 2,662.0 04:30 05:30 spear into 9-5/8" hanger.Pick up the casing the hanger & the packoff assy 3' it took140K to pull. shut the Hydrill and finish pulling the seal assy 8'. Page 36/52 Report Printed: 1/9/2020 AL operations Summary (with Timelog Lepths) C D4-594 i' ♦ M Rig: DOYON 141 Job: DRILLING ORIGINAL Time Log Start Depth Start Time End Time Dur (hr) Phase Op Code Activity Code Time P-T-X Operation (ftKB) End Depth (ftKB) 11/26/2019 11/26/2019 2.50 INTRM2 CSGRCY CIRC P Pump 30 bbls of Deep Clean pill 2,662.0 2,662.0 05:30 08:00 followed by 40 bbls of high vis Spacer.pump 131 bbls of diesel & 34 bbls of seawater to the Tiger tank.chase with 10 ppg Lsnd Mud, GPM=120 Psi=260. pick The rate up to 150 GPM @ 360 PSI.Pump. until we Got the 10PPG of LSND to the tiger tank. 11/26/2019 11/26/2019 0.50 INTRM2 CSGRCY OWFF P Observe the well For Flow F/ 30 2,662.0 2,662.0 08:00 08:30 Mins.No flow. 11/26/2019 11/26/2019 0.75 INTRM2 CSGRCY PULL P Pooh to the casing Hanger & Pack off 2,662.0 2,640.0 08:30 09:15 Assy. and Lay Down the Same. 11/26/2019 11/26/2019 1.75 INTRM2 CSGRCY RURD P PJSM, R/U GBR 9 5/8" Casing 2,640.0 2,640.0 09:15 11:00 Equipment. 11/26/2019 11/26/2019 1.00 INTRM2 CSGRCY PULL T RD and change out GBR power tongs 2,640.0 2,640.0 11:00 12:00 11/26/2019 11/26/2019 0.75 INTRM2 CSGRCY EQRP T Change out GBR hydraulic power unit 2,640.0 2,640.0 12:00 12:45 11/26/2019 11/26/2019 5.25 INTRM2 CSGRCY PULL P POOH and LD 9-5/8" tieback from 2,640.0 760.0 12:45 18:00 2,640' MD 11/26/2019 11/26/2019 1.50 INTRM2 CSGRCY PULL P Cont. POOH and LD 9-5/8" tieback 760.0 0.0 18:00 19:30 from 760' MD 11/26/2019 11/26/2019 0.50 INTRM2 CSGRCY RURD P RD casing equipment 0.0 0.0 19:30 20:00 11/26/2019 11/26/2019 0.50 INTRM2 CSGRCY RURD P Clean and clear rig floor 0.0 0.0 20:00 20:30 11/26/2019 11/26/2019 2.00 INTRM2 CEMENT RURD P PJSM, change out upper rams from 9- 0.0 0.0 20:30 22:30 5/8" solid body rams to 7" solid body rams. SIMOPS change out saver sub. 11/26/2019 11/26/2019 1.00 INTRM2 CEMENT RURD P RU testing equipment for rams and 0.0 0.0 22:30 23:30 annular 11/26/2019 11/27/2019 0.50 INTRM2 CEMENT PRTS P Test 7" rams and annular with 7" test 0.0 0.0 23:30 00:00 joint 11/27/2019 11/27/2019 0.50 INTRM2 CEMENT BOPE P Continue Testing the 7" Casing Rams, 0.0 0.0 00:00 00:30 and the Annular test to 250 low test F/5 Min's & the High Test Was 3,500 psi. Everything tested Good. 11/27/2019 11/27/2019 0.50 INTRM2 CEMENT RURD P Rig Down The Testing Equipment. 0.0 0.0 00:30 01:00 11/27/2019 11/27/2019 0.50 INTRM2 CEMENT PULD P Mobilize the casing Eqipment to the 0.0 0.0 01:00 01:30 Rig Floor. 11/27/2019 11/27/2019 1.00 INTRM2 CEMENT RURD P Rig Up the 7" Casing Running 0.0 0.0 01:30 02:30 Equipment, Slips,The CRT Tools. 11/27/2019 11/27/2019 1.00 INTRM2 CEMENT PUTB P Pick up the 7" Hanger, and the landing 0.0 0.0 02:30 03:30 Joint, and make A Dummy run into the Wellhead. 11/27/2019 11/27/2019 2.50 INTRM2 CEMENT PUTB P PJSM, Run the 7" 26# TXP L- 0.0 845.0 03:30 06:00 80,Torqueing the Connection's To 845". 11/27/2019 11/27/2019 6.00 INTRM2 CEMENT PUTB P PJSM, Run the 7" 26# TXP L- 845.0 4,356.0 06:00 12:00 80,Casing F/845' to 4,356'Torqueing the Connection's To 19,000k. 11/27/2019 11/27/2019 6.00 INTRM2 CEMENT PUTB P PJSM, Run the 7" 26# TXP L- 4,356.0 7,116.0 12:00 18:00 80,Casing F/4,356' to 7,116' Torqueing the Connection's To 19,000k. 11/27/2019 11/28/2019 6.00 INTRM2 CEMENT PUTB P PJSM, Run the 7" 26# TXP L- 7,116.0 18:00 00:00 80,Casing F/ 7,116' To 9,660' MD torquing the connection's To 19,000k. 11/28/2019 11/211/2011 0.75 INTRM2 CEMENT PUTB P Continue to run the 7" 26# TXP L-80, 9,903.0 10,022.0 00:00 00:45 F/9903' to 10022' MD. P/U=147 SOW=80. Page 37/52 Report Printed: 1/9/2020 operations Summary (with Timelog uepths) C D4-594 Rig: DOYON 141 Job: DRILLING ORIGINAL Time Log Start Depth Start Time End Time Dur (hr) Phase Op Code Activity Code Time P-T-X Operation (ftKB) End Depth (ftKB) 11/28/2019 11/28/2019 0.75 INTRM2 CEMENT PUTB P Break Circulation 42=GPM Psi=260 10,022.0 10,067.0 00:45 01:30 RIH F/10,022' to 10,062' MD. Engage The Seals @ 10,067' MD.Tag the No - Go W/30K @ 10,077' MD. 11/28/2019 11/28/2019 0.50 INTRM2 CEMENT PRTS P Test The Back Seals to 1000 Psi. For 01:30 02:00 10 MINS. the Test Was Good. 11/28/2019 11/28/2019 1.00 INTRM2 CEMENT PULD P Laydown 3 Joint's For Spacing Out. 02:00 03:00 11/28/2019 11/28/2019 1.00 INTRM2 CEMENT PUTB P Pick up the Space out Pups, X-O, 03:00 04:00 Hanger. 11/28/2019 11/28/2019 1.00 INTRM2 CEMENT HOSO P M/U Circulation Equipment on the 04:00 05:00 Landing Joint, M/U the Hanger,and Space Out With The Mule Shoe 3' Above the top of the Liner,Break Circulation @ GPM=42 @ Psi=260. 11/28/2019 11/28/2019 5.25 INTRM2 CEMENT FRZP P PJSM, Pump40 BUS Of High Vis 05:00 10:15 Spacer in the Annulus,Chase with 261 Bbls of Corrision INHIBITED SeaWater,Then Pump 223Bbls Of Diesel Freeze Protect With LRS Unit FCP= 525 Psi. 11/28/2019 11/28/2019 0.25 INTRM2 CEMENT HOSO P Land the Hanger,Open up the Choke 10,065.0 0.0 10:15 10:30 manifold, & Bleed the Trapped Psi In the Stack,open the annular, Blow Down the Choke Manifold & The Cement Line's. 11/28/2019 11/28/2019 0.50 INTRM2 CEMENT PULD P Back out & Laydown the 7" Landing 0.0 0.0 10:30 11:00 Joint, and the X/O'S 11/28/2019 11/28/2019 0.75 INTRM2 CEMENT CLEN P LayDown the 7" Handling 0.0 0.0 11:00 11:45 Equipment,Clean the Rig Floor 11/28/2019 11/28/2019 0.75 INTRM2 CEMENT CLEN P Rig Up & remove the Diesel Fuel from 0.0 0.0 11:45 12:30 The Bope, with AES. 11/28/2019 11/28/2019 1.25 INTRM2 CEMENT THGR P Make up the The Pack Off running tool 0.0 0.0 12:30 13:45 & Set the pack off. Set 5K of Block Weight to set the Pack off.. 11/28/2019 11/28/2019 1.25 INTRM2 CEMENT PRTS P Test the 13-3/8" x 9-5/8" x 7" Annulus 0.0 0.0 13:45 15:00 to 2500 psi for 30 Mins.( Simops- Service The Top Drive. and Prep to Change Out The saver Sub. 11/28/2019 11/28/2019 1.50 INTRM2 CEMENT SEQP P PJSM, Change out the SaverSub.to 0.0 0.0 15:00 16:30 XT-39. Simops Change the Top pipe rams F/ 7" Casing Rams to the 3.5 x 6" VBR's. 11/28/2019 11/28/2019 2.00 INTRM2 CEMENT BOPE P Set The Test plug, Rig Up And Test 0.0 0.0 16:30 18:30 The Upper Pipe Rams 3 1/2" x 6" VBRS test them To 225 low test and 3500 Psi. Both were 5 Mins Test. Rig Down the testing Equipment. 11/28/2019 11/28/2019 0.50 INTRM2 CEMENT WWSP P Make up the wear Ring Setting tool & 0.0 0.0 18:30 19:00 set The wear ring. 6.312 ID. OD 13.41. 12" Long, and LayDown the test Joint. 11/28/2019 11/28/2019 1.00 INTRM2 CEMENT OTHR P Blow Down the.Kill Line, and the MPD 0.0 0.0 19:00 20:00 Lines. 11/28/2019 11/28/2019 0.50 INTRM2 CEMENT BHAH P MOB the Bha Components. to the Rig 0.0 0.0 20:00 20:30 Floor. 11/28/2019 11/29/2019 3.50 INTRM2 DRILLOUT TRIP P Run In the hole With the 4" drill pipe. 0.0 0.0 20:30 00:00 LID 15 stands of 5" drill pipe. 11/29/2019 11/29/2019 1.00 INTRM2 DRILLOUT PULD P Continue Laying Down 15 Stands Of 0.0 0.0 00:00 01:00 5" Drill Pipe Using the mouse Hole. 11/29/2019 11/29/2019 2.25 INTRM2 DRILLOUT PULD P Single in 12 Joints of 4" HWDP From 0.0 0.0 01:00 03:15 the Pipe Shed & Rack Back The Same. Page 38/52 Report Printed: 1/9/2020 AL operations Summary (with Timelog uepths) CD4-594 Rig: DOYON 141 Job: DRILLING ORIGINAL Time Log Start Depth Start Time End Time Dur (hr) Phase Op Code Activity Code Time P-T-X Operation (ftKB) End Depth (ftKB) 11/29/2019 11/29/2019 5.75 INTRM2 DRILLOUT PULD P PJSM, Single in the hole W/ 4" Drill 0.0 0.0 03:15 09:00 Pipe from the Pipe Shed. Total of 3,441'. 11/29/2019 11/29/2019 1.00 INTRM2 DRILLOUT TRIP P Pooh with the 4" Drill pipe F/3,441', to 0.0 0.0 09:00 10:00 Surface 11/29/2019 11/29/2019 0.50 INTRM2 DRILLOUT BHAH P Mobilize the BHA to the rig Floor. 0.0 0.0 10:00 10:30 11/29/2019 11/29/2019 2.25 INTRM2 DRILLOUT BHAH P PJSM, make UpThe Bha #5. To 210'. 0.0 210.0 10:30 12:45 PJSM, Load The Sources INTO The BHA. 11/29/2019 11/29/2019 1.25 INTRM2 DRILLOUT BHAH P Continue Picking up The Bha,#5 210.0 445.0 12:45 14:00 F/210' to 445' 11/29/2019 11/29/2019 1.50 INTRM2 DRILLOUT TRIP P Single in the hole w/4" Drill pipe from 445.0 1,391.0 14:00 15:30 the pipe Shed, F/445'to 1,391'. 11/29/2019 11/29/2019 0.50 INTRM2 DRILLOUT DHEQ P Shallow Test The Bha @1,391'. 1,391.0 1,391.0 15:30 16:00 GPM=200,SPM=70, PSI=1500, Rpm=40. 11/29/2019 11/29/2019 0.25 INTRM2 DRILLOUT OTHR P Blow Down the top Drive, And Install 1,391.0 1,391.0 16:00 16:15 the Air Slips. 11/29/2019 11/29/2019 5.00 INTRM2 DRILLOUT TRIP P Single in the hole w/4" Drill pipe from 1,391.0 5,551.0 16:15 21:15 the pipe Shed, F/1,391'to 5,551' 11/29/2019 11/29/2019 0.50 INTRM2 DRILLOUT DHEQ P Fill the pipe & test the The Bha @ 5,551.0 5,551.0 21:15 21:45 GPM=200, SPM=70, PSI=1600, RPM=40, TQ=3K, P/U Wt=84K ,S/O WT=60K, Rot Wt=70K. 11/29/2019 11/30/2019 2.25 INTRM2 DRILLOUT TRIP P TIH With the 4" D.P.F/5,551' to 8,477' 5,551.0 8,477.0 21:45 00:00 MD Filling the Pipe Every 15 Stands. 11/30/2019 11/30/2019 4.00 INTRM2 DRILLOUT TRIP P TIH With the 4" D.P.F/8,477' to 14,531' 8,477.0 14,531.0 00:00 04:00 MD Filling the Pipe Every 15 Stands. SOW=40K 11/30/2019 11/30/2019 1.50 INTRM2 DRILLOUT PRTS P Test the 7" Casing to 3500 Psi For 30 14,531.0 14,531.0 04:00 05:30 Mins. The Test Held Good. 11/30/2019 11/30/2019 0.25 INTRM2 DRILLOUT OTHR P Blow Down/Rig Down all of The 14,531.0 14,531.0 05:30 05:45 Testing equipment. 11/30/2019 11/30/2019 0.75 INTRM2 DRILLOUT CIRC P Circulate & Wash down F/14,531'to 14,531.0 05:45 06:30 14,643 MD. SPM=65, GPM=191,PS1=2300 11/30/2019 11/30/2019 5.50 INTRM2 DRILL DRLG P Drill Out The Cement & Plugs 14,643.0 14,647.0 06:30 12:00 F/14,643' to 14,647'. SPM=60, GPM=175, PSI=2088, RPM=40, TQ=13-16K, WOB=15-20K, P/U WT=120K, SOW WT=40K, RTW=85K SPR: Time=0635, MW=10 PPG, MD=14,615, TVD=4033'. #1 20 SPM= 780 PSI, 30 SPM=960 PSI. #2 20 SPM= 820 PSI, 30 SPM=980 PSI. 11/30/2019 11/30/2019 0.75 INTRM2 DRILL DRLG P Drill Out The Cement & Plugs 14,647.0 14,688.0 12:00 12:45 F/14,647'.To 14,688' SPM=60, GPM=175, PSI=2088, RPM=40, TQ=13-16K, WOB=15-20K, P/U WT=120K, SOW WT=40K, RTW=85K 11/30/2019 11/30/2019 1.50 INTRM2 DRILL DRLG P Drill Out The Cement & Plugs 14,688.0 14,773.0 12:45 14:15 F/14,688' MD TO The top of the Float Shoe. 14,733' SPM=65, GPM=191, PSI=2300, RPM=80, TQ=13-16K, WOB=6K, P/U WT=125K, SOW WT=37K, RTW=85K Page 39/52 Report Printed: 1/9/2020 L.perations Summary (with Timelog L,apths) CD4-594 ..< Rig: DOYON 141 Job: DRILLING ORIGINAL Time Log Start Depth Start Time End Time Dur (hr) Phase Op Code Activity Code Time P-T-X Operation (ftKB) End Depth (ftKB) 11/30/2019 11/30/2019 1.25 INTRM2 DRILL DRLG P Drill Out The Float Shoe & 20" Of New 14,773.0 14,795.0 14:15 15:30 Hole, F/14,773 MD TO 14,795' SPM=65, GPM=191, PSI=2300, RPM=80, TQ=13-16K, WOB=6K, P/U WT=125K, SOW WT=37K, RTW=85K 11/30/2019 11/30/2019 1.50 INTRM2 DRILL CIRC P Circ & Condition The Mud For the Fit 14,795.0 14,795.0 15:30 17:00 Test @ 200GPM. 11/30/2019 11/30/2019 0.75 INTRM2 DRILL FIT P Perform The Fit Test To 1838 Psi,And 14,795.0 14,795.0 17:00 17:45 the Pressaure Broke Over. STKS=76, 5.2 Bbls, and Bleed Back 2.75 Bbls. 11/30/2019 11/30/2019 0.25 INTRM2 DRILL SEQP P RIG Down, the Testing 14,795.0 14,795.0 17:45 18:00 Equipment,Blow Down The Lines. 11/30/2019 11/30/2019 1.00 INTRM2 DRILL MPDA P PJSM,Install the MPD Bearing. 14,795.0 14,795.0 18:00 19:00 11/30/2019 11/30/2019 3.50 INTRM2 DRILL CIRC P PJSM, Displace the Hole W/ 8.2 PPG 14,795.0 14,795.0 19:00 22:30 OBM, From the 10 ppg LSND Water Base Mud. 11/30/2019 12/1/2019 1.50 INTRM2 DRILL CLEN P Clean up Under the Shaker's, Possum 14,795.0 14,795.0 22:30 00:00 Belly,And the rock Washer. 12/1/2019 12/1/2019 6.00 PROD2 DRILL DDRL P 6-1/8" Production Hole 14,795.0 15,060.0 00:00 06:00 Section, F/14,795' to 15,060', TVD=4098', P/U Wt=150K, SOW= N/A, ROT WT=85K, TQ ON BTTM=11.5K, TQ OFF Bttm=llk, Flow Out+26%, WOB=5K, RPM=80, GPM=206, SPM=69, On Bttm Psi=2740,PS1 OFF=2720, ADT=4.98, Total Bit Hrs=4.98, Total JAR HRS=119.92. 12/1/2019 12/1/2019 3.25 PROD2 DRILL DDRL P 6-1/8" Production Hole 15,060.0 15,192.0 06:00 09:15 Section,F/15,060' To 15,192', TVD=4125', P/U Wt=150K, SOW= N/A, ROT WT=85K, TQ ON BTTM=11.5K, TQ OFF Bttm=llk, Flow Out+26%, WOB=5-7K, RPM=140, GPM=200, SPM=69, On Bttm Psi=2740,PS1 OFF=2720, ECD'S=11.27ADT=3.71, Total Bit Hrs=8.69, Total JAR HRS=123.63. SPR: Time=0850, MD WT=8.2 PPG, MD=15,190', TVD=4123' #1 20 SPM=1080 PSI, MPD=355, 30 SPM=1220 PSI MPD=305 #2 20 SPM=1020 PSI, MPD=355, 30 SPM=1180 PSI MPD=305 12/1/2019 12/1/2019 5.00 PROD2 DRILL DDRL T Trouble Shoot Schlumberger 15,192.0 15,192.0 09:15 14:15 DigiScope 12/1/2019 12/1/2019 4.00 PROD2 DRILL DDRL P 6-1/8" Production Hole 15,192.0 15,411.0 14:15 18:15 Section, F/15,192',to 15,411' TVD=4151', P/U Wt=155K, SOW= N/A, ROT WT=90K, TQ ON BTTM=12K, TQ OFF Bttm=13k, Flow Out+26%, WOB=8-10K, RPM=140, GPM=200, SPM=69, On Bttm Psi=2620, PS I OFF=2610, ECD'S=11.06, ADT=1.44, Total Bit Hrs=13, Total JAR HRS=125.07. Page 40/52 Report Printed: 1/9/2020 t..perations Summary (with Timelog Lapths) C D4-594 Rig: DOYON 141 Job: DRILLING ORIGINAL Time Log Start Depth Start Time End Time Dur (hr) Phase Op Code Activity Code Time P-T-X Operation (ftKB) End Depth (ftKB) 12/1/2019 12/2/2019 5.75 PROD2 DRILL DDRL P 6-1/8" Production Hole 15,411.0 15,754.0 18:15 00:00 Section, F/15411'to 15754' TVD=4208', P/U Wt=155K, SOW= N/A, ROT WT=90K, TO ON BTTM=12K, TQ OFF Bttm=13k, Flow Out+26%, WOB=8-1OK, RPM=140, GPM=200, SPM=69, On Bttm Psi=2620,PSI OFF=2610, ECD'S=11.06, ADT=1.44, Total Bit Hrs=13, Total JAR HRS=125.07. 12/2/2019 12/2/2019 3.50 PROD2 DRILL DDRL P 6-1/8" Production Hole 15,754.0 16,000.0 00:00 03:30 Section,F/15,754 to 16,000' TVD=4233', P/U Wt=163K, SOW= N/A, ROT WT=84K, TQ ON BTTM=10K, TQ OFF Bttm=14k, Flow Out+24%, WOB=3K, RPM=140, GPM=200, SPM=68, On Bttm Psi=2570', PS I OFF=2570, ECD'S=11.09 MAX Gas=893. 12/2/2019 12/2/2019 1.00 PROD2 DRILL DDRL T Trouble Shoot The MWD Tools. 16,000.0 16,000.0 03:30 04:30 12/2/2019 12/2/2019 1.50 PROD2 DRILL DDRL P 6-1/8" Production Hole 16,000.0 16,040.0 04:30 06:00 Section, F/16,000' to 16,040 TVD=4234', P/U Wt=163K, SOW= N/A, ROT WT=84K, TO ON BTTM=10K, TQ OFF Bttm=14k, Flow Out+24%, WOB=3K, RPM=140, GPM=200, SPM=68, On Bttm Psi=2570',PSI OFF=2570, ECD'S=11.09 MAX Gas=893. 12/2/2019 12/2/2019 1.50 PROD2 DRILL DDRL T Trouble Shoot The MWD Tools. 16,040.0 16,040.0 06:00 07:30 12/2/2019 12/2/2019 1.75 PROD2 DRILL DDRL P 6-1/8" Production Hole 16,040.0 16,134.0 07:30 09:15 Section, F/16,040 to 16,134' TVD=4235', P/U Wt=150K, SOW= N/A, ROT WT=86K, TQ ON BTTM=9- 10K, TQ OFF Bttm=10k, Flow Out+24%, WOB=3K, RPM=140, GPM=200, SPM=66, On Bttm Psi=2600', PS I OFF=2580, ECD'S=11.05 MAX Gas=893. 12/2/2019 12/2/2019 0.75 PROD2 DRILL DDRL T Trouble Shoot The MWD Tools. 16,134.0 16,134.0 09:15 10:00 12/2/2019 12/2/2019 2.00 PROD2 DRILL DDRL P 6-1/8" Production Hole 16,134.0 16,276.0 10:00 12:00 Section, F/16,134' To 16,276' TVD=4236', P/U Wt=150K, SOW= N/A, ROT WT=86K, TQ ON BTTM=9- 10K, TQ OFF Bttm=10k, Flow Out+24%, WOB=10-15K, RPM=140, GPM=200, SPM=68, On Bttm Psi=2630', PSI OFF=2600, ECD'S=11.05 MAX Gas=893. 12/2/2019 12/2/2019 1.25 PROD2 DRILL DDRL T Trouble Shoot The MWD Tools. 16,276.0 16,276.0 12:00 13:15 12/2/2019 12/2/2019 1.25 PROD2 DRILL DDRL P 6-1/8" Production Hole 16,276.0 16,326.0 13:15 14:30 Section, F/16,276' To 16,326' TVD=4237', P/U Wt=145K, SOW= N/A, ROT WT=82K, TQ ON BTTM=11 K, TQ OFF Bttm=10k, Flow Out+24%, WOB=15K, RPM=140, GPM=200, SPM=68, On Bttm Psi=2630',PSI OFF=2550', ECD'S=11.09 MAX Gas=826. 12/2/2019 12/2/2019 0.50 PROD2 DRILL DDRL T Trouble Shoot The MWD Tools. 16,326.0 16,326.0 14:30 15:00 1 I I I Page 41/52 Report Printed: 1/9/2020 operations Summary (with Timelog L apths) C D4-594 Rig: DOYON 141 Job: DRILLING ORIGINAL Time Log Start Depth Start Time End Time our (hr) Phase Op Code Activity Code Time P-T-X Operation (ftKB) End Depth (ftKB) 12/2/2019 12/2/2019 3.00 PROD DRILL DDRL P 6-1/8" Production Hole 16,326.0 16,480.0 15:00 18.00 Section, F/16,326' To 16480' TVD=4242, P/U Wt=145K, SOW= N/A, ROT WT=82K, TQ ON BTTM=11 K, TQ OFF Bttm=10k, Flow Out+24%, WOB=15-20 K, RPM=140, GPM=200, SPM=68, On Bttm Psi=2680', PS I OFF=2660', ECD'S=11.09 MAX Gas=638. 12/2/2019 12/3/2019 6.00 PROD2 DRILL DDRL P 6-1/8" Production Hole 16,480.0 17,100.0 18:00 00:00 Section, F/16,746' To 17,100' TVD=4272, P/U Wt=150K, SOW= N/A, ROT WT=80K, TQ ON BTTM=1OK, TQ OFF Bttm=13k, Flow Out+24%, WOB=3-5 K, RPM=140, GPM=200, SPM=68, On Bttm Psi=2620', PSI OFF=2620', ECD'S=11.16 MAX Gas=692 12/3/2019 12/3/2019 6.00 PROD2 DRILL DDRL P Drill 6-1/8" Production Hole 16,745.0 17,070.0 00:00 06:00 Section, F/1 6,745' T/ 17,070' TVD=4277', P/U Wt=150K, SOW= N/A, ROT WT=60K, TQ ON BTTM=11K, TQ OFF Bttm=14k, Flow Out+20%, WOB=3K, RPM=140, GPM=200, SPM=68, On Bttm Psi=2620', PSI OFF=2610, ECD'S=11.12 MAX Gas=308. -ADT 4.6 hrs, Total bit HRS 31, Total Jar hrs 145.94 12/3/2019 12/3/2019 4.50 PROD2 DRILL DDRL P Drill 6-1/8" Production Hole 17,070.0 17,266.0 06:00 10:30 Section, F/17,070' T/ 17,266', TVD=4285', P/U Wt=160K, SOW= 0, ROT WT=83K, TQ ON BTTM=12K, TQ OFF Bttm=14 k, Flow Out+20%, WOB=5/6 K, RPM=140, GPM=200, SPM=68, On Bttm Psi=2650',PSI OFF=2630, ECD'S=11.01 MAX Gas= 673. -ADT 3.05 hrs, Total bit HRS 34,05 Total Jar hrs 148.99 12/3/2019 12/3/2019 1.00 PROD2 DRILL SRVY T Troubleshoot MWD. Re -synch 17,266.0 17,266.0 10:30 11:30 surveys 12/3/2019 12/3/2019 0.50 PROD2 DRILL DDRL P Drill 6-1/8" Production Hole 17,623.0 17,286.0 11:30 12:00 Section, F/17,266' T/ 17,285', TVD=4285', P/U Wt=160K, SOW= 0, ROT WT=83K, TQ ON BTTM=12K, TQ OFF Bttm=14 k, Flow Out+20%, WOB=5/6 K, RPM=140, GPM=200, SPM=68, On Bttm Psi=2650',PSI OFF=2630, ECD'S=11.01 MAX Gas= 673. -ADT 3.55 hrs, Total bit HRS 34,55 Total Jar hrs 149.49 12/3/2019 12/3/2019 6.00 PROD2 DRILL DDRL P Drill 6-1/8" Production Hole Section,F/ 17,285.0 17,623.0 12:00 18:00 17,285' T/ 17,623", P/U Wt=155 K, SOW= 0, ROT WT=86K, TQ ON BTTM=1OK, TQ OFF Bttm=13 k, Flow Out+20%, WOB=4/6 K, RPM=140, GPM=200, SPM=68, On Bttm Psi=2640', PS I OFF=2630, ECD'S=11.16, MAX Gas= 350. -ADT 4.91 hrs, Total bit HRS 39.46 Total Jar hrs 154.4 Page 42/52 Report Printed: 1/9/2020 Operations Summary (with Timelog Depths) CD4-594 IAM Rig: DOYON 141 Job: DRILLING ORIGINAL Time Log Start Depth Start Time End Time Dur (hr) Phase Op Code Activity Code Time P-T-X Operation (ftKB) End Depth (ftKB) 12/3/2019 12/4/2019 6.00 PROD2 DRILL DDRL P Drill 6-1/8" Production Hole Section,F/ 17,623.0 17,930.0 18:00 00:00 17,623' T/ 17,930', TVD= 4293', P/U Wt=160 K, SOW= 0, ROT WT=80 K, TO ON BTTM=11K, TQ OFF Bttm=14 k, Flow Out+27%, WOB=5/7 K, RPM=140, GPM=200, SPM=68, On Bttm Psi=2740',PSI OFF=2730, ECD'S=11.16, MAX Gas= 249. -ADT 4.91 hrs, Total bit HRS 39.46 Total Jar hrs 154.4 12/4/2019 12/4/2019 6.00 PROD2 DRILL DDRL P Drill 6-1/8" Production Hole Section,F/ 17,930.0 18,245.0 00:00 06:00 17,930', T/ 18,245' TVD= 4314', P/U Wt=165 K, SOW= 0, ROT WT=80 K, TQ ON BTTM=I2K, TO OFF Bttm=14 k, Flow Out+27%, WOB=3/5 K, RPM=140, GPM=200, SPM=68, On Bttm Psi=2670',PSI OFF=2650, ECD'S=11.31, MAX Gas= 490. -ADT 4.69 hrs, Total bit HRS 48.72 Total Jar hrs 163.66 12/4/2019 12/4/2019 5.00 PROD2 DRILL DDRL P Drill 6-1/8" Production Hole Section,F/ 18,245.0 18,492.0 06:00 11:00 18,245 T/ 18,492' TVD= 4330', P/U Wt=170 K, SOW= 0, ROT WT=80 K, TQ ON BTTM=12K, TQ OFF Bttm=14 k, Flow Out+27%, WOB=5/6 K, RPM=140, GPM=200, SPM=68, On Bttm Psi=2750',PSI OFF=2700, ECD'S=11.25, MAX Gas= 501. - 12/4/2019 12/4/2019 0.50 PROD2 DRILL DDRL T Trouble shoot DIGISCOPE 18,492.0 18,492.0 11:00 11:30 12/4/2019 12/4/2019 0.50 PROD2 DRILL DDRL P Drill 6-1/8" Production Hole Section,F/ 18,492.0 18,514.0 11:30 12:00 18,492 T/ 18,514' TVD= 4323', P/U Wt=170 K, SOW= 0, ROT WT=80 K, TQ ON BTTM=12K, TQ OFF Bttm=14 k, Flow Out+27%, WOB=5/6 K, RPM=140, GPM=200, SPM=68, On Bttm Psi=2750',PSI OFF=2700, ECD'S=11.25, MAX Gas= 501. - ADT 5.13, Total Bit Hrs 53.85, Total Jars HRS 168.79 12/4/2019 12/4/2019 6.00 PROD2 DRILL DDRL P Drill 6-1/8" Production Hole Section,F/ 18,514.0 18,850.0 12:00 18:00 18,514' T/ 18,850 TVD= 4310', P/U Wt=175 K, SOW= 0, ROT WT=80 K, TQ ON BTTM=13K, TQ OFF Bttm=14 k, Flow Out+27%, WOB=5 K, RPM=140, GPM=200, SPM=68, On Bttm Psi=2750',PSI OFF=2730, ECD'S=11.24, MAX Gas= 234. - ADT 3.47, Total Bit Hrs 57.32, Total Jars HRS 172.26 12/4/2019 12/5/2019 6.00 PROD2 DRILL DDRL P Drill 6-1/8" Production Hole Section,F/ 18,850.0 19,140.0 18:00 00:00 18,850 T/ 19,140 md, TVD',4294', P/U Wt=175 K, SOW= 0, ROT WT=80 K, TQ ON BTTM=13K, TQ OFF Bttm=14 k, Flow Out+27%, WOB=5 K, RPM=140, GPM=200, SPM=68, On Bttm Psi=2750',PSI OFF=2730, ECD'S=11.24, MAX Gas= 234. - ADT 5.21, Total Bit Hrs 62.53, Total Jars HRS 177.47 Page 43/52 Report Printed: 1/9/2020 Operations Summary (with Timelog Depths) C D4-594 Rig: DOYON 141 Job: DRILLING ORIGINAL Time Log Start Depth Start Time End Time our (hr) Phase Op Code Activity Code Time P-T-X Operation (ftKB) End Depth (ftKB) 12/5/2019 12/5/2019 6.00 PROD2 DRILL DDRL P Drill 6-1/8" Production Hole Section,F/ 19,140.0 19,445.0 00:00 06:00 19,140 T/19,445 md, P/U Wt=170 K, SOW= 0, ROT WT=86 K, TQ ON BTTM=10.5K, TO OFF Bttm=9.5 k, Flow Out+28%, WOB=6 K, RPM=140, GPM=200, SPM=68, On Bttm Psi=2780',PSI OFF=2780, ECD'S=11.22, MAX Gas= 219. - ADT 4.52, Total Bit Hrs 66.05, Total Jars HRS 180.99 12/5/2019 12/5/2019 3.50 PROD2 DRILL DDRL P Drill 6-1/8" Production Hole 19,445.0 19,615.0 06:00 09:30 Section ,F/19,445 T/ 19,615' md, TVD 4,269' P/U Wt=170 K, SOW= 0, ROT WT=93 K, TQ ON BTTM=11 K, TQ OFF Bttm=10 k, Flow Out+28%, WOB= 5/6 K, RPM=140, GPM=200, SPM=68, On Bttm Psi= 3180',PSI OFF= 3110, ECD'S=11.53, MAX Gas= 421. - 12/5/2019 12/5/2019 0.75 PROD2 DRILL DDRL T Trouble shoot DigiScope MWD 19,615.0 19,615.0 09:30 10:15 communication issues 12/5/2019 12/5/2019 1.75 PROD2 DRILL DDRL P Drill 6-1/8" Production Hole 19,615.0 19,690.0 10:15 12:00 Section ,F/19,615' T/ 19,690 md, TVD 4,273' P/U Wt=170 K, SOW= 0, ROT WT=93 K, TQ ON BTTM=11 K, TQ OFF Bttm=10 k, Flow Out+28%, WOB= 5/6 K, RPM=140, GPM=200, SPM=68, On Bttm Psi= 2820',PSI OFF= 2820, ECD'S=11.33, MAX Gas= 394. - ADT 4.79 Total bit hrs 70.84, Total Jar Hrs 185.78 12/5/2019 12/5/2019 6.00 PROD2 DRILL DDRL P Drill 6-1/8" Production Hole Section ,F/ 19,690.0 19,965.0 12:00 18:00 19,690 T/ 19,965' md, TVD 4254' P/U Wt=170 K, SOW= 0, ROT WT=93 K, TQ ON BTTM=11 K, TQ OFF Bttm=10 k, Flow Out+28%, WOB= 5/6 K, RPM=140, GPM=200, SPM=68, On Bttm Psi= 2820',PSI OFF= 2820, ECD'S=11.33, MAX Gas= 394. - ADT 4.99 Total bit hrs 70.84, Total Jar Hrs 185.78 12/5/2019 12/6/2019 6.00 PROD2 DRILL DDRL P Drill 6-1/8" Production Hole Section ,F/ 19,965.0 20,249.0 18:00 00:00 19,965' T/ 20,249' md, TVD 4229' P/U Wt=170 K, SOW= 0, ROT WT=88 K, TQ ON BTTM=11.5 K, TQ OFF Bttm=10 k, Flow Out+28%, WOB= 5/6 K, RPM=140, GPM=200, SPM=68, On Bttm Psi= 2820',PSI OFF= 2820, ECD'S=11.45, MAX Gas= 394. - ADT 4.80 Total bit hrs 79.03, Total Jar Hrs 193.97 12/6/2019 12/6/2019 3.00 PROD2 DRILL DDRL P Drill 6-1/8" Production Hole Section ,F/ 20,249.0 20,434.0 00:00 03:00 20,249' T/ 20,434 md, TVD 4220' P/U Wt=175 K, SOW= 0, ROT WT=89 K, TQ ON BTTM=11.0 K, TQ OFF Bttm=13 k, Flow Out+28%, WOB= 9/10 K, RPM=140, GPM=206, SPM=70, On Bttm Psi= 3090',PSI OFF= 3060, ECD'S=11.59, MAX Gas= 422. - 12/6/2019 12/6/2019 0.50 PROD2 DRILL DDRL T Trouble shoot MWD tools 20,434.0 20,434.0 03:00 03:30 Page 44/52 Report Printed: 1/9/2020 Operations Summary (with Timelog Depths) C D4-594 Rig: DOYON 141 Job: DRILLING ORIGINAL Time Log Start Depth Start Time End Time Dur (hr) Phase Op Code Activity Code Time P-T-X Operation (ftKB) End Depth (ftKB) 12/6/2019 12/6/2019 1.75 PROD2 DRILL DDRL P Drill 6-1/8" Production Hole Section ,F/ 20,434.0 20,524.0 03:30 05:15 20,434', 20,524' md, TVD 4215' P/U Wt=175 K, SOW= 0, ROT WT=89 K, TQ ON BTTM=11.5 K, TQ OFF Bttm=13 k, Flow Out+28%, WOB= 8 K, RPM=140, GPM=206, SPM=70, On Bttm Psi= 3130',PSI OFF= 3060, ECD'S=11.59, MAX Gas= 101. - ADT 4.19 Bit Hrs 83.22 Total Jar hrs 198.16 12/6/2019 12/6/2019 2.50 PROD2 DRILL DDRL T Trouble shoot MWD tools 20,524.0 20,524.0 05:15 07:45 12/6/2019 12/6/2019 1.75 PROD2 DRILL DDRL P Drill 6-1/8" Production Hole Section F/ 20,524.0 20,616.0 07:45 09:30 20,524' T/20,616' md, TVD 4205' P/U Wt=175 K, SOW= 0, ROT WT=89 K, TQ ON BTTM=11 K, TQ OFF Bttm=13 k, Flow Out+28%, WOB= 10 K, RPM=140, GPM=206, SPM=70, On Bttm Psi= 3160',PSI OFF= 3140, ECD'S=11.59, MAX Gas= 75 12/6/2019 12/6/2019 0.50 PROD2 DRILL DDRL T Trouble shoot MWD tools 20,616.0 20,616.0 09:30 10:00 12/6/2019 12/6/2019 0.75 PROD2 DRILL DDRL P Drill 6-1/8" Production Hole Section F/ 20,616.0 20,629.0 10:00 10:45 20,524' T/20,629' md, TVD 4204' P/U Wt=175 K, SOW= 0, ROT WT=89 K, TQ ON BTTM=11 K, TQ OFF Bttm=13 k, Flow Out+28%, WOB= 10 K, RPM=140, GPM=206, SPM=70, On Bttm Psi= 3160',PSI OFF= 3140, ECD'S=11.59, MAX Gas= 75 12/6/2019 12/6/2019 0.75 PROD2 DRILL DDRL P Trouble shoot MWD tools 20,629.0 20,629.0 10:45 11:30 12/6/2019 12/6/2019 0.50 PROD2 DRILL DDRL P Drill 6-1/8" Production Hole Section 20,629.0 20,653.0 11:30 12:00 F/20,629' T/ 20653' md, TVD 4203' P/U Wt=102 K, SOW= 0, ROT WT=102 K, TQ ON BTTM=12 K, TQ OFF Bttm=15 k, Flow Out+28%, WOB= 8 K, RPM=140, GPM=203, SPM=69, On Bttm Psi= 3100',PSI OFF= 3080, ECD'S=11.59, MAX Gas= 45, ADT 2.46 hrs, Total bit HRS 85.68, Total Jar Hrs 200.62 12/6/2019 12/6/2019 1.00 PROD2 DRILL DDRL P Drill 6-1/8" Production Hole Section F/ 20,653.0 20,700.0 12:00 13:00 20653' T/ 20,700' md, TVD 4200' P/U Wt=180 K, SOW= 0, ROT WT=102 K, TQ ON BTTM=12 K, TQ OFF Bttm=15 k, Flow Out+28%, WOB= 8 K, RPM=140, GPM=203, SPM=69, On Bttm Psi= 3100',PSI OFF= 3080, ECD'S=11.47, MAX Gas= 45, 12/6/2019 12/6/2019 0.75 PROD2 DRILL DDRL T Trouble shoot MWD tools 20,700.0 20,700.0 13:00 13:45 12/6/2019 12/6/2019 4.25 PROD2 DRILL DDRL P Drill 6-1/8" Production Hole Section 20,700.0 20,800.0 13:45 18:00 F/20,700' T/ 20,800' md, TVD 4187' P/U Wt=180 K, SOW= 0, ROT WT=98 K, TQ ON BTTM=12 K, TQ OFF Bttm=15 k, Flow Out+28%, WOB= 8 K, RPM=140, GPM=206, SPM=70, On Bttm Psi= 3170',PSI OFF= 3160, ECD'S=11.63, MAX Gas= 463, ADT 4.94 hrs, Total bit HRS 90.62, Total Jar Hrs 205.56 Page 45/52 Report Printed: 1/9/2020 Operations Summary (with Timelog Depths) C D4-594 Rig: DOYON 141 Job: DRILLING ORIGINAL Time Log Start Depth Start Time End Time our (hr) Phase Op Code Activity Code Time P-T-X Operation (ftKB) End Depth (ftKB) 12/6/2019 12/6/2019 3.00 PROD2 DRILL DDRL P Drill 6-1/8" Production Hole Section F/ 20,800.0 20,984.0 18:00 21:00 20,800' T/ 20,984' md, P/U Wt=180 K, SOW= 0, ROT WT=98 K, TQ ON BTTM=12 K, TQ OFF Bttm=15 k, Flow Out+28%, WOB= 8 K, RPM=140, GPM=206, SPM=70, On Bttm Psi= 3170',PSI OFF= 3160, ECD'S=11.63, MAX Gas= 463, 12/6/2019 12/6/2019 1.50 PROD2 DRILL CIRC T Circulate and recipocate pipe, clean 20,984.0 20,984.0 21:00 22:30 hole. 12/6/2019 12/7/2019 1.50 PROD2 DRILL DDRL P Drill 6-1/8" Production Hole Section F/ 20,984.0 21,030.0 22:30 00:00 20,800' T/ 21,030' md, P/U Wt=180 K, SOW= 0, ROT WT=98 K, TQ ON BTTM=12 K, TQ OFF Bttm=15 k, Flow Out+28%, WOB= 8 K, RPM=140, GPM=206, SPM=70, On Bttm Psi= 3170',PSI OFF= 3160, ECD'S=11.63, MAX Gas= 463, ACT 1.63 Total bit Hrs 92.28, Total jar Hrs 207.22 12/7/2019 12/7/2019 0.50 PROD2 DRILL DDRL P Drill 6-1/8" Production Hole Section F/ 21,030.0 21,046.0 00:00 00:30 21,030' T/ 21,046' md, TVD 4180', P/U Wt=185 K, SOW= 0, ROT WT=100 K, TQ ON BTTM=12 K, TO OFF Bttm=12 k, Flow Out+28%, WOB= 5 K, RPM=140, GPM=206, SPM=70, On Bttm Psi= 3230',PSI OFF= 3210, ECD'S=11.78, MAX Gas= 640, 12/7/2019 12/7/2019 1.50 PROD2 DRILL DDRL T Trouble shoot mwd tools 21,046.0 21,046.0 00:30 02:00 12/7/2019 12/7/2019 4.25 PROD2 DRILL DDRL P Drill 6-1/8" Production Hole Section F/ 21,046.0 21,170.0 02:00 06:15 21 046' T/ 21,170 and TVD 4178% TD called by geology P/U Wt=173 K, SOW= 0, ROT WT=104 K, TQ ON BTTM=12 K, TQ OFF Bttm=13 k, Flow Out 28%, WOB= 5 K, RPM=140, GPM=206, ^ SPM=70, On Bttm Psi= 3250',PSI OFF= 3230, ECD'S=12.0, MAX Gas= 420, ADT 4.46 Total Bit Hrs 96.74, Total Jar Hrs 211.69 12/7/2019 12/7/2019 2.00 PROD2 CASING CIRC P Circulate bottoms up W/ SPM 71, 21,170.0 21,170.0 06:15 08:15 GPM 209, SPP 3380, RPM 140, Trq 11 K, ECD 11.6, P/U 173 K, ROT wt 104 K 12/7/2019 12/7/2019 3.75 PROD2 CASING BKRM P Back ream F/ 21,170 and T/ 20,660' 21,170.0 20,660.0 08:15 12:00 and TVD 4225' @ 1000 FPM, w/ 200 gpm, 140 rpm, trq 10/12 K, spp 3150, Rot wt 104K 12/7/2019 12/7/2019 6.00 PROD2 CASING BKRM P Back ream F/ 20,660' T/ 18,400' md, 20,660.0 18,400.0 12:00 18:00 TVD 4322' @ 1000 FPM, w/ 200 gpm, 140 rpm, trq 9/10 K, spp 2800, Rot wt 94K, Max Gas 64 12/7/2019 12/8/2019 6.00 PROD2 CASING BKRM P Back ream F/ 18,400' T/ 16348' md, 18,400.0 16,348.0 18:00 00:00 @ 1000 FPM, w/ 200 gpm, 140 rpm, trq 9 K, spp 2723, Rot wt 87 K, Max Gas 33 12/8/2019 12/8/2019 5.50 PROD2 CASING BKRM P Back ream F/ 16348' md,T/ 14,767' @ 16,348.0 00:00 05:30 1000 FPM, w/ 206 gpm, 140 rpm, trq 9/10 K, spp 2500, Rot wt 90 K, Max Gas 52, WRK with packing off F/ 14,871 T/ 14,764. as BHA entering 7" shoe. Page 46152 Report Printed: 1/9/2020 -.operations Summary (with Timelog Lapths) C D4-594 Rig: DOYON 141 Job: DRILLING ORIGINAL Time Log Start Depth Start Time End Time Phase Op Code Activity Code Time P-T-X Operation (ftKB) End Depth (ftKB) 12/8/2019 12/8/2019 PROD2 CASING CIRC P Circulate & cond Mud W/ SPM 70, w/ 14,774.0 14,774.0 05:30 11:30 r6.00 200 gpm, 140 rpm, trq 9/10 K, spp 2500, Rot wt 90 K 12/8/2019 12/8/2019 PROD2 CASING CIRC P Pump high visc pill @ 14,774' @ Spm 14,774.0 14,774.0 11:30 12:15 68, GPM 200, RPM 140, SPP 2400, ROW WT. 90 k. 12/8/2019 12/8/2019 0.75 PROD2 CASING PMPO P Pump out of hole F/14774 T/ 14,274 14,774.0 14,274.0 12:15 13:00 spotting 10 ppg high vis pill (500') in side of 7" csg, @ 1500 fph, W/ 14 spm, 44 gpm, 660 spp, 20 rpm 12/8/2019 12/8/2019 2.75 PROD2 CASING DISP P Displace 8.2 ppg obm T/ 10.0 ppg 14,274.0 14,274.0 13:00 15:45 obm @ 14,274', W/ 140 rpm, 8 k trq, 69 spm 2900 spp, 203 gpm, end with 17 spm 50 gpm, 860 spp. 12/8/2019 12/8/2019 1.75 PROD2 CASING OWFF P OWFF, Close MPD choke, monitor 14,274.0 14,274.0 15:45 17:30 well, psi built up T/ 80 psi, bleed off psi, close choke, psi built up T/ 70 psi. bled off & shut in psi increased T/ 60 psi in 4 min, bleed off & shut, psi increased T/ 50 spi in 4 min. continue monitoring well un till well statick Forl5 min 12/8/2019 12/8/2019 0.50 PROD2 CASING OTHR P Obtain SPR'S, blow down TD. 14,274.0 14,274.0 17:30 18:00 12/8/2019 12/9/2019 6.00 PROD2 CASING SMPD P Strip out of hole on elev. F/ 14,274' T/ 14,274.0 7,968.0 18:00 00:00 7968' md. maintaing 10.7 ppg, Equiv. W/MPD, following Trip sechule @ 1500 FPH F/ 14,775, T/ 13500'. 2000 FPH F/ 13500' T/ 11,500', 3600FPH F/ 11 500'T/ 6500' 12/9/2019 12/9/2019 5.00 PROD2 CASING SMPD P Strip out of hole on elev. F/ 7,968' T/ 7,968.0 540.0 00:00 05:00 540' md. maintaing 10.7 ppg, Equiv. W/MPD, following Trip sechule @ 1500 FPH F/ 14,775, T/ 13500'. 2000 FPH F/ 13500' T/ 11,500', 3600FPH F/ 11500' T/ 6500' 12/9/2019 12/9/2019 1.25 PROD2 CASING OWFF P Flow check well through MPD, clean 540.0 540.0 05:00 06:15 rig floor. 12/9/2019 12/9/2019 1.50 PROD2 CASING NUND P PJSM, Remove MPD bearing, install 540.0 540.0 06:15 07:45 bell nipple & nipple up riser. 12/9/2019 12/9/2019 3.25 PROD2 CASING BHAH P PJsm, L/D bha, remove sources, 540.0 0.0 07:45 11:00 continue L/D bha. Calculated Displacement = 135 bbls, Actual displacement = 210 bbls, losses = 74 bbls 12/9/2019 12/9/2019 1.00 PROD2 CASING CLEN P Clean / Clear rig floor. 0.0 0.0 11:00 12:00 12/9/2019 12/9/2019 0.75 COMPZN CASING BOPE P P/U stack washer & flush bop's 0.0 0.0 12:00 12:45 12/9/2019 12/9/2019 0.50 COMPZN CASING BOPE P Drain stack & pull wear bushing 0.0 0.0 12:45 13:15 12/9/2019 12/9/2019 1.75 COMPZN CASING BOPE P Rig up to test Bop's 0.0 0.0 13:15 15:00 1 I I I Page 47/52 Report Printed: 1/9/2020 Operations Summary (with Timelog Depths) CD4-594 Rig: DOYON 141 Job: DRILLING ORIGINAL Time Log Start Depth Start Time End Time Dur (hr) Phase Op Code Activity Code Time P-T-X Operation (ftKB) End Depth (WB) 12/9/2019 12/9/2019 7.50 COMPZN WHDBOP BOPE P Test bops w/ 4.5 test jt. Test @ 250 0.0 0.0 15:00 22:30 low / 3500 psi high @ 5 min. each, Test top rams, valves 1,12,13,14 and 4" demco kill line. Upper IBOP, HCR kill, valves # 9,11,13, lower IBOP, valves 5,8,10. dart valve and valves 2, HCR choke, manual choke, HCR Kill, Annular preventer, blind rams, super choke, lower pipe rams. P/U 4" test joint. Test @ 250 low / 3500 psi high @ 5 min. each. Test annular, upper & e lower 3 1/2" X 6" VBR rams. Perform Accumlator Test : System psi = 2950, Pressure after closing 1800 psi. 200 psi attained @ 41 sec. Full charge attained @ 172 sec. Nitrogen bottle average = 1800 12/9/2019 12/9/2019 0.50 COMPZN CASING BOPE P Rig down testing equipment and blow 0.0 0.0 22:30 23:00 down surface equipment. 12/9/2019 12/9/2019 0.50 COMPZN CASING BOPE P Set 6.321 wear bushing & RLDS 0.0 0.0 23:00 23:30 12/9/2019 12/10/2019 0.50 COMPZN CASING SVRG P Service rig, check torque on top drive 0.0 23:30 00:00 12/10/2019 12/10/2019 2.00 COMPZN CASING RURD P Rig up GBR casing running 0.0 0.0 00:00 02:00 equipment. 12/10/2019 12/10/2019 4.00 COMPZN CASING PUTB P RIH w/ 4 1/2, 12.6#, L-80 Hyd 563 0.0 1,545.0 02:00 06:00 Tubing T/ 1545', at 500 FPH. �'h L SO 54 K���� 12/10/2019 12/10/2019 6.00 COMPZN CASING PUTB P Continue RIH w/ 4 1/2, 12.6#, L-80 1,545.0 3,874.0 06:00 12:00 Hyd 563 Tubing F/ 1545' T/ 3874' SO 63 K @ 500 FPH 95 jts Calculated displacement = 18 bbls, Actual disp = 13 bbls 12/10/2019 12/10/2019 1.00 COMPZN CASING CLEN P Remove air slips, clean rig floor, C/O 3,874.0 3,874.0 12:00 13:00 elevators, 12/10/2019 12/10/2019 0.75 COMPZN CASING PUTB P P/U liner hanger. M/U Schlumberger 3,874.0 3,874.0 13:00 13:45 SCMT log tool 12/10/2019 12/10/2019 1.25 COMPZN CASING PUTB T Attempt to make up liner hanger. GBR 3,874.0 3,874.0 13:45 15:00 casing tongs wouldn't troque hanger to proper torque, rig down csg tongs, and C/o. 12/10/2019 12/10/2019 0.75 COMPZN CASING PUTB T Rig up backup GBR casing tongs & 3,874.0 3,874.0 15:00 15:45 M/U liner hanger to proper torque 12/10/2019 12/10/2019 0.25 COMPZN CASING RUNL P P/U 1 std, RIH F/ 3874 T/ 4056', 3,874.0 4,056.0 15:45 16:00 circulate @ 30 spm, 88 gpm, 450 spp, @ 0 RPM: P/U 70 K, S/O 66 K, @20 rpm: 1.2 K trq / 40 RPM 12/10/2019 12/10/2019 0.50 COMPZN CASING PUTB P P/U Rubicon swivel master, confirm 4,056.0 4,056.0 16:00 16:30 rotation. 12/10/2019 12/10/2019 0.25 COMPZN CASING RUNL P P/U 1 std drill pipe, RIH F/ 4056' T/ 4,056.0 4,150.0 16:30 16:45 4150', P/U 70 K, S/O 66 K, ROT WT 66 K At 20 RPM: PU 70K / SO 66K / ROT 66K/TQ 1.1K At 60 RPM: PU 66K / SO 66K / ROT 66K / TO 1.1 K 12/10/2019 12/10/2019 1.25 COMPZN CASING RUNL P Cont RIH W/ 4 1/2", 12.6# L-80 liner, 4,150.0 5,379.0 16:45 18:00 on 4" DP @ obtaining TQ & Drag Every 2000' F/ 4150' T/ 5379', @ 3500 FPH, Fill pipe every 15 stds. at 30 spm, 88 gpm, 450 spp, Page 48/52 Report Printed: 1/9/2020 - jperations Summary (with Timelog uepths) C D4-594 4 Rig: DOYON 141 Job: DRILLING ORIGINAL Time Log Start Depth Start Time End Time Dur (hr) Phase Op Code Activity Code Time P-T-X Operation (ftKB) End Depth (WB) 12/10/2019 12/11/2019 6.00 COMPZN CASING RUNL P Cont RIH W/ 4 1/2", 12.6# L-80 liner, 5,379.0 12,087.0 18:00 00:00 on 4" DP F/ 5379' T/ 12087', @ 3500 FPH, Fill pipe every 15 stds. Obtaining TO & Drag Every 2000' At 11,000 MD, PU 110K K / SO 60K K (0 rpm) 60 RPM: PU 85K / SO 80K / TO 4.7K 12/11/2019 12/11/2019 3.50 COMPZN CASING RUNL P Cont RIH W/ 4 1/2", 12.6# L-80 liner, 12,087.0 14,745.0 00:00 03:30 on 4" DP F/ 12087', T/ 14,754' @ 3500 FPH, Fill pipe every 15 stds. Obtaining TQ & Drag Every 2000' , PU 103 K / SO 52 K, 60 rpm, P/U 85K, S/O 80 K, 4.7 Trq. 60 RPM: PU 85K / SO 80K / TQ 4.7K 12/11/2019 12/11/2019 1.50 COMPZN CASING OWFF P OWFF, Cont. monitoring well & 14,745.0 14,745.0 03:30 05:00 remove riser, install MPD bearing, circ. through chokes on mpd. prep pits for displacement. 12/11/2019 12/11/2019 8.25 COMPZN CASING DISP P Displace well over F/ 10.0 ppg obm T/ 14,745.0 14,745.0 05:00 13:15 8.2 ppg obm. - pump 70 bbl hi vis pill, @ 15 SPM, 42 GPM, 800 psi, AT 4000stks, pump and rotate @ 40 rpm, trq 6/7 K, Spm 24, gpm 70, SPP 840. 12/11/2019 12/11/2019 1.75 COMPZN CASING TRIP P Attempt to RIH F/ 14,754, on 14,745.0 14,800.0 13:15 15:00 elevators, M/U top drive rotate doe T/ 14800'. @ 20 rpm, 30 spm, 670 spp, P/U 135 k, S/O 124 K, 12/11/2019 12/11/2019 0.50 COMPZN CASING RUNL P POOH T/ 14,754', Consult W/ drlg 11,754.0 14,745.0 15:00 15:30 1 engineer. Inspect RCD Bearing. 12/11/2019 12/12/2019 8.50 COMPZN CASING RUNL P Rotate liner down F/ 14754' T/ 16038' 14,745.0 16,038.0 15:30 00:00 @ 500 / 600 FPH @ 20 rpm, trq 6/7 K, P/U 135 K, - Rotating dwn wt. 40/60 K, ROT up 125 K 12/12/2019 12/12/2019 5.00 COMPZN CASING RUNL P Continue RIH Rotating liner down F/ 16,038.0 17,707.0 00:00 05:00 16038' T/ 17707' @ 500 / 800 FPH @ 1/2 bpm, 40 rpm, trq 10 K, - Rotating P/U 130 k, dwn wt. 85 K, ROTwt 105 K 12/12/2019 12/12/2019 0.50 COMPZN CASING RUNL T L/D stand of HWDP, W/ drift stuck in 17,707.0 17,707.0 05:00 05:30 top jt. 12/12/2019 12/12/2019 0.50 COMPZN CASING CIRC P Circulate & work pipe while Adjusting 17,707.0 17,707.0 05:30 06:00 pipe talley. 12/12/2019 12/12/2019 2.75 COMPZN CASING RUNL P Continue RIH Rotating liner down F/ 17,707.0 18,509.0 06:00 08:45 17707' T/ 18509' @ 500 / 800 FPH @ 1/2 bpm, 7 gpm, 630 spp, 40 rpm, trq 10 K, - Rotating P/U 130 k, dwn wt. 85 K, ROTwt 105 K 12/12/2019 12/12/2019 0.50 COMPZN CASING RUNL P Space out, obtain P/U & S/O = P/u 18,509.0 18,509.0 08:45 09:15 170K, S/O 0, Rot wt 105K 12/12/2019 12/12/2019 2.75 COMPZN CASING PACK P Pump 15 bbl hi vis obm pill, drop 18,509.0 18,509.0 09:15 12:00 1.625 ball, chase w/ 5 bbl viscous pill, @ 43 spm, 126 gpm, 1150 spp, slow pump T/ 29 spm, 84 gpm, 830 spp, j ball seated @ 1983 stks. Psi up T/ 2200 psi. Set hanger. S/O 50 K,, confirm hanger set. Pressure up T/ 4100 psi, confirm release. P/U to 160 K, S/O T/ 40 K, shear dog sub. Confirm W/ rotation @ 20 rpm. P/U 125 K, ose Rt est and chart annline T/ 3500 psi, as through ghkill For 10 mins. 12/12/2019 12/12/2019 3.50 COMPZN WELLPR DISP P P/U 22' To set end of running tool in tie 18,509.0 14,550.0 12:00 15:30 back sleeve. PJSM, Displace well over T/ 9.2 KW brine per MI Swaco. Page 49/52 Report Printed: 1/9/2020 operations Summary (with Timelog uepths) C D4-594 Rig: DOYON 141 Job: DRILLING ORIGINAL Time Log Start Depth Start Time End Time Dur (hr) Phase Op Code Activity Code Time P-T-X Operation (ftKB) End Depth (ftKB) 12/12/2019 12/12/2019 1.00 COMPZN WELLPR CIRC P Circulate 1.5 B/U @ 97 SPM, 284 14,550.0 14,550.0 15:30 16:30 GPM, 2000 SPP. 12/12/2019 12/12/2019 1.00 COMPZN WELLPR CIRC P PUMP 40 BBLS FO CORROSION 14,550.0 14,550.0 16:30 17:30 INHIBITED 9.2 BRING, FOLLOWED BY 155 BBLS OG 9.2 kw BRINE @ 97 SPM, 284 GPM, 2000 SPP. 12/12/2019 12/12/2019 0.50 COMPZN WELLPR OWFF P Monitor well thru MPD choke, 14,550.0 14,550.0 17:30 18:00 12/12/2019 12/12/2019 1.25 COMPZN WELLPR TRIP P Remove MPD bearing, install bell 14,550.0 14,550.0 18:00 19:15 nipple. 12/12/2019 12/12/2019 0.75 COMPZN WELLPR CLEN P Flush # 1 pump, kill line, & hole fill 18,487.0 14,531.0 19:15 20:00 pump, W/ deep clean & H2O, flush & B/D MPD lines, clean shaker pans. 12/12/2019 12/13/2019 4.00 COMPZN WELLPR DLOG P Trip out of hole F/ 14531 T/ 12097', @ 14,531.0 12,097.0 20:00 00:00 1600 FPH, W/ SCMT tools, P/U 160 K 12/13/2019 12/13/2019 1.50 COMPZN WELLPR DLOG P Trip out of hole F/ 12097' T/ 11405' @ 12,097.0 11,405.0 00:00 01:30 1600 FPH, W/ SCMT tools, P/U 110 K 12/13/2019 12/13/2019 1.50 COMPZN WELLPR SVRG P Rig service , while discussing 7" liner 11,405.0 11,405.0 01:30 03:00 log correlation W/ Engineers in town. 12/13/2019 12/13/2019 3.00 COMPZN WELLPR TRIP P Trip out of hole @ 5000 FPH, F/ 11405 11,405.0 4,791.0 03:00 06:00 T/ 4791', W/ SCMT tools, P/U 100K, 12/13/2019 12/13/2019 3.00 COMPZN WELLPR TRIP P Trip out of hole @ 5000 FPH, F/ 4791' 4,791.0 22.0 06:00 09:00 T/ SLB logging tools. (sim ops. clean pits) 12/13/2019 12/13/2019 2.00 COMPZN WELLPR PULD P L/D SLB loggong tools, L/D Baker liner 22.0 0.0 09:00 11:00 running tools. Cal hole fill = 106.78 bbls, actual fill 110.6 bbls 12/13/2019 12/13/2019 2.00 COMPZN WELLPR SLPC P Cut & slip 36' drlg line. 0.0 0.0 11:00 13:00 12/13/2019 12/13/2019 0.50 COMPZN WELLPR CLEN P Clean & prep rig floor for L/D drill pipe. 0.0 0.0 13:00 13:30 12/13/2019 12/13/2019 4.50 COMPZN WELLPR PULD P L/D stands of drill pipe out of derrick. 0.0 0.0 13:30 18:00 12/13/2019 12/14/2019 6.00 COMPZN WELLPR PULD P Continue L/D stands of drill pipe out 0.0 0.0 18:00 00:00 of derrick. 99 stds laid down. 12/14/2019 12/14/2019 18.50 COMPZN WELLPR PULD P Continue L/D 130 stands of drill pipe 0.0 0.0 00:00 18:30 out of derrick. in mouse hole. 12/14/2019 12/14/2019 1.50 COMPZN WELLPR WWWH P Flush stack, pull wear ring, flush 0.0 0.0 18:30 20:00 wellhead, blowdown top drive, PU hanger, LID wear rings, setting tool and test plugs 12/14/2019 12/14/2019 3.00 COMPZN RPCOMP RURD P PJSM. RU Schlumberger TEC line 0.0 0.0 20:00 23:00 shieve and spool, RU GBR casing equipment 12/14/2019 12/15/2019 1.00 COMPZN RPCOMP RURD P PJSM, PURU no-go sub, landing 23:00 00:00 nipple and Baker premier packer 12/15/2019 12/15/2019 0.50 COMPZN RPCOMP PULD P M/U Schlumberger solid gauge 144.1 220.0 00:00 00:30 mandrel, PSI test tech wire connections @ 5000 psi, F/ 5 min, M/U tech wire. 12/15/2019 12/15/2019 5.50 COMPZN RPCOMP PULD P Continue RIH @ 1500 FPH W/ 4 1/2", 220.0 3,678.0 00:30 06:00 12.6, L-80 HYD 563, upper completion F/ 220' T/ 3678' ( 88 JTS ) S/O 60 K 12/15/2019 12/15/2019 6.00 COMPZN RPCOMP PULD P Continue RIH @ 2000 FPH W/ 4 1/2", 3,678.0 8,608.0 06:00 12:00 12.6, L-80 HYD 563, upper completion F/ 3678' T/ 8608' S/O 55 K. 12/15/2019 12/15/2019 2.00 COMPZN RPCOMP PULD P Continue RIH @ 2000 FPH W/ 4 1/2", 8,608.0 10,296.0 12:00 14:00 12.6, L-80 HYD 563, upper completion F/ 8608' T/ 10296' S/O 55 K. Page 50/52 Report Printed: 1/9/2020 operations Summary (with Timelog uepths) CD4-594 Rig: DOYON 141 Job: DRILLING ORIGINAL Time Log Start Depth Start Time End Time our (hr) Phase Op Code Activity Code Time P-T-X Operation (ftKB) End Depth (ftKB) 12/15/2019 12/15/2019 0.25 COMPZN RPCOMP PULD P Liner stopped @ 10296', took full 10,296.0 10,296.0 14:00 14:15 string wt.S/O T/15K, P/U to linger broke over, S/O Liner stopped same spo, P/U string approx 20', S/O string passed thru, P/U 55 K, S/O 55K 12/15/2019 12/15/2019 3.75 COMPZN RPCOMP PULD P Continue RIH @ 2000 FPH W/ 4 1/2", 10,296.0 13,124.0 14:15 18:00 12.6, L-80 HYD 563, upper completion F/ 10296' T/ 13124', S/O 55 K. 12/15/2019 12/15/2019 2.00 COMPZN RPCOMP PULD P Continue RIH @ 2000 FPH W/ 4 1/2", 13,124.0 14,491.0 18:00 20:00 12.6, L-80 HYD 563, upper completion F/ 13124' T/ 14491', P/U 110 K, S/O 52 K. 12/15/2019 12/15/2019 1.00 COMPZN RPCOMP PULD P M/U 3 jts, Tag NO GO, pins sheared 14,491.0 14,491.0 20:00 21:00 @ 15 K, P/U to up wt 110 K, S/O and set 10 K on No GO- - so wt 52 K I/d jts 358-357-356. 12/15/2019 12/15/2019 0.50 COMPZN RPCOMP HOSO P M/U 2 space out pups (15.70') jt. 356, 14,491.0 14,491.0 21:00 21:30 m/u hanger & landing jt. 12/15/2019 12/15/2019 0.50 COMPZN RPCOMP THGR P M/U Tech wire feed to hanger, test @ 14,491.0 14,491.0 21:30 22:00 5000 psi. 12/15/2019 12/16/2019 2.00 COMPZN RPCOMP CLEN P Clean and clear rig floor of CSG 14,491.0 14,573.0 22:00 00:00 running Equip. R/D I wire spooler, remoce excess cannon clamps & tools from rig floor. Rig up line for setting PKR. 12/16/2019 12/16/2019 2.00 COMPZN RPCOMP PACK P Pressure test surface lines @ 3500 psi 14,573.0 0.0 00:00 02:00 F/ 5 min. Psi up Tubing T/ 4000 psi & set PKR ( screws sheared @ 1800 psi & 2300 psi. hold psi F/ 30 min on chart. monitor annulas, Bleed dwn T/ 2000 psi. Pressure up Annulas T/ 3850 psi, hold F/ 30 min. hti\AC 12/16/2019 12/16/2019 0.50 COMPZN RPCOMP DHEQ P Pressure up IA T/ 3000 psi, Shear 0.0 0.0 02:00 02:30 SOV, Bleed off psi. SOV sheared @ 2700 psi. Flo check tubing and IA for flo ? 15 min well static. 12/16/2019 12/16/2019 1.00 COMPZN WHDBOP MPSP P Install HP BPV. Pressure test 0.0 0.0 02:30 03:30 direction of flow down IA and up tubing, Test @ 2500 psi F/ 15 min on chart. 12/16/2019 12/16/2019 2.50 COMPZN WHDBOP NUND P PJSM, pull mouse hole, riser, bleed 0.0 0.0 03:30 06:00 down koomey unit. MPD equipment, open doors on rams, For end of well maintenance. 12/16/2019 12/16/2019 4.00 COMPZN WHDBOP NUND P Remove rams from stack. 0.0 0.0 06:00 10:00 12/16/2019 12/16/2019 2.00 COMPZN WHDBOP MPDA P R/D MPD orbit valve 0.0 0.0 10:00 12:00 12/16/2019 12/16/2019 2.50 COMPZN WHDBOP NUND P R/D choke and kill lines, HCR, manual 0.0 0.0 12:00 14:30 valves, N/D bop's 12/16/2019 12/16/2019 1.50 COMPZN WHDBOP NUND P Terminate Tec wire into well head, 0.0 0.0 14:30 16:00 place tree in cellar and prep to P/U. 12/16/2019 12/16/2019 1.50 COMPZN WHDBOP NUND P Make up adapter flange. and test 0.0 0.0 16:00 17:30 flange void @ 5000 psi F/ 10 min, test good. 12/16/2019 12/16/2019 2.50 COMPZN WHDBOP NUND P N/U Tree to adapter flange. Fill tree W/ 0.0 0.0 17:30 20:00 diesel & test @ 250 LO / 10,000 high F/ 15 min. pull test dart & type H BPV. Final readings on the SLB gauge mandrel 1914 psi; 90.42' F @ 16:02 hrs. Page 51/52 Report Printed: 1/9/2020 ALI "perations Summary (with Timelog uepths) CD4-594 Rig: DOYON 141 Job: DRILLING ORIGINAL Time Log Start Depth Start Time End Time Dur (hr) Phase Op Code Activity Code Time P-T-X Operation (ftKB) End Depth (ftKB) 12/16/2019 12/16/2019 2.50 COMPZN WHDBOP FRZP P PJSM, R/U Little red & hoses for 0.0 0.0 20:00 22:30 freeze protecting. Pump 51 bbls diesel down IA, taking returns up tubing.@ 2 BPM, 1250 psi. U tube well, 12/16/2019 12/17/2019 1.50 COMPZN WHDBOP MPSP P Rig up lubicator and set type H BPV. 0.0 r 0.0 22:30 00:00 1 1 I Page 52/52 Report Printed: 1/9/2020 Good Moderate to Good Good PRESSURE INTEGRITY TEST CONOCOPHILLIPS Alaska, Inc. Well Name: CD4-594 Rig: Doyon 141 Date: 10/30/2019 Volume Input Volume/Stroke Pump Rate: Drilling Supervisor: Whitlock / Connor Pump used: #1 Mud Pump Strokes S 0.0699 Bbls/Strk 5.00 Strk/min Type of Test: Casing Shoe Test LOT/FIT Pumping down annulus and DP. W Casing Test Pressure Integrity est Hole Size: USE PICK LIST Casing Shoe Depth Hole Depth Pumping Shut-in PU ping Shut-in RKB-CHF:j 27.51 Ft 10260.0 Ft -MD Ft -TV 10287.0 Ft -MD 3450.0 Ft-TVD Strks si Min psi Strks psi Min psi CaSIn I Size and DBScriotion: USE PICK LIST w li 0 0 0 1000 0 0 0.00 750 Casin Test Pressurelnteotr&Test 5 100 1 2950 5 150 0.25 741 Mud Weight: 11.0 ppg Mud 10 min Gel: 13.0 Lb/100 Ft2 Test Pressure: 2900.0 psi Rotating Weight: 48100.0 Lbs Blocks/Top Drive Weight 29000.0 Lbs Estimates for Test: -O.T bbis Mud Weight: Mud 10 min Gel: 13.0 Rotating Weight: 92000.0 Blocks/Top Drive Weight: 29000.0 Desired PIT EMW: 15.0 Estimates for Test: 717 ppg Lb/100 Ft2 Lbs Lbs ppg psi .0.1 bbis 10 250 2 29501 10 310 0.50 733 15 390 3 29501 15 420 1.00 726 20 510 4 29501 18 5501 1.50 720 25 620 5 2950 20 5901 2.00 715 30 750 6 2950 23 650 2.50 712 35 7 2925 25 700 3.00 709 40 45 1000 1110 8 9 2925 2925 -50 3.50 4.00 707 705 EMW= Leak -off Pressure + Mud eig -- 750 + 11 0.052 x TVD 0.051 -x3 EMW at 10260 Ft -MD (3448 Ft-TVD) = 1,1 PIT 15 Second Shut-in Pressure, psi 50 1250 10 2925 4.50 703 741 55 1390 15 2925 5.00 702 3500 3000 2500 X 2000 y w 1500 0 ,000 Soo 0 o Lost held s o s Shut-in 0 75 9 psi during of tot test, 60 1500 20 2925 5.50 701 65 1650 25 2925 6.00 700 .5% 70 1780 30 '926 1 6.50 700 75 19001 1 7.00 700 _ 80 2100 7.50 700 85 2180 8.00 700 90 2330 8.50 700 95 2490 9.00 700 100 2600 9.50 700 105 2750 10.00 700 1121 3000 , CASING z TEST 3 Barrels e a --0--LEAK-OFF 7 e TEST 10 PIT Pant 15 time, 20 Minutes ze 30 Volume Pumped Volume Bled Back Volume Pum ed Volume Bled Back S S S S Comments: Summary THE STATE 'ALASKA GOVERNOR MIKE DUNLEAVY Chip Alvord Drilling Manager ConocoPhillips Alaska, Inc. PO Box 100360 Anchorage, AK 99510-0360 Alaska Oil and Gas Conservation Commission Re: Exploratory Field, exploratory Oil Pool, CD4-594PH ConocoPhillips Alaska, Inc. Permit to Drill Number: 219-115 Surface Location: 2853' FNL, 4915' FEL, Sec. 19, T1IN, R5E, UM Bottomhole Location: 4600' FNL, 870' FEL, Sec. 33, T11N, R5E, UM Dear Mr. Alvord: 333 West Seventh Avenue Anchorage, Alaska 99501-3572 Main: 907.279.1433 Fax: 907.276.7542 www.aogcc.alaska.gov Enclosed is the approved application for the permit to drill the above referenced exploration well. This permit to drill does not exempt you from obtaining additional permits or approvals required by law from other governmental agencies and does not authorize conducting drilling operations until all other required permits and approvals have been issued. In addition, the AOGCC reserves the right to withdraw the permit in the event it was erroneously issued. A weekly status report is required from the time the well is spudded until it is suspended or plugged and abandoned. The report should be a generalized synopsis of the week's activities and is exclusively for the AOGCC's internal use. The permit is approved subject to full compliance with 20 AAC 25.055. Approval to inject is contingent upon issuance of a conservation order approving a spacing exception. ConocoPhillips Alaska, Inc. assumes the liability of any protest to the spacing exception that may occur. Per Statute AS 31.05.030(d)(2)(B) and Regulation 20 AAC 25.071, composite curves for well logs run must be submitted to the AOGCC within 90 days after completion, suspension or abandonment of this well. Operations must be conducted in accordance with AS 31.05 and Title 20, Chapter 25 of the Alaska Administrative Code unless the AOGCC specifically authorizes a variance. Failure to comply with an applicable provision of AS 31.05, Title 20, Chapter 25 of the Alaska Administrative Code, or an AOGCC order, or the terms and conditions of this permit may result in the revocation or suspension of the permit. Sincerely, qVWCe-/X CLL� ssie L. Chmielowski Commissioner DATED this I day of October, 2019. OF ALASKA CONFIDENTIAL E ;KA OIL AND G STCONSERVAT ON COM 31ON PERMIT TO DRILL 9n AAr. 9s nns 1 a. Type of Work: 1 b. Proposed Well Class: Exploratory - Gas ❑ Service - WAG ❑ Service - Disp ❑ 1 c. Specify if well is proposed for: Drill ❑� ' Lateral ❑ Stratigraphic Test ❑ Development - Oil ❑ Service - Winj ❑� Single Zone ❑ Coalbed Gas ❑ Gas Hydrates ❑ Redrill ❑ Reentry ❑ Exploratory - Oil Development - Gas ❑ Service - Supply ❑ Multiple Zone ❑ Geothermal ❑ Shale Gas ❑ 2. Operator Name: 5. Bond: Blanket Single Well ❑ 11. Well Name and Number: ConocoPhillips Bond No. 59-52-180 CD4-594 f f (1 { r!k/l 3. Address: 6. Proposed Depth: 12. Field/Pool(s): 700 G Street ATO15-1552 MD: 21,562 TVD: 4,212 Exploratory 4a. Location of Well (Governmental Section): 7. Property Designation: Surface: 2853' FNL, 4915' FEL, Sec 19, Twn 11 N, Rg 5 E ADL384211, ADL380082, ADL380081, ADL391587 Top of Productive Horizon: 8. DNR Approval Number: 13. Approximate Spud Date: 4164' FNL, 4274' FEL, Sec 28, Twn 11 N, Rg 5 E LIONS 09-009 Oct. 1, 2019 9. Acres in Propertv: 14. Distance to Nearest Property: Total Depth: 4600' FNL, 870' FEL, Sec 33, Twn 11 N, Rg 5 E 2485, 640, 640, 640 680' (ADL393167) 4b. Location of Well (State Base Plane Coordinates - NAD 27): 10. KB Elevation above MSL (ft): 47.0 - 15. Distance to Nearest Well Open Surface: x- 378291 y- 5957553 Zone-4 GL / BF Elevation above MSL (ft): 19 . to Same Pool: NA 16. Deviated wells: Kickoff depth: 300 feet 17. Maximum Potential Pressures in psig (see 20 AAC 25.035) Maximum Hole Angle: 93 degrees Downhole: 1947 psi . Surface: 1531 psi 18. Casing Program: Specifications Top - Setting Depth - Bottom Cement Quantity, c.f. or sacks Hole Casing Weight Grade Coupling Length MD TVD MD TVD (including stage data) 42" 20" 154 X-65 Welded 80 Surf Surf 105 105 Cemented to surface with 11 yds 16" 13-3/8" 68 L-80 TXPM 2,937 Surf Surf 2,911 2,397 1319 sx 15.8 ppg DeepCRETE Lead, 330 sx 15.8 ppg Class 'G' Tail 12-1/4" 9-5/8" 40 L-80 TXPM 7,496 2,761 2,336 10,257 3,447 767 sx 15.8ppg Class 'G' 8-3/4" 7" 26 L-80 TXPM 14,732 Surf Surf 14,779 4,061 282 sx 13 ppg Extended Lead, 113 sx 15.8ppg Class 'G' Tail 6-1/8" 4-1/2" 12.6 L-80 HYD563 1 4,071 14,629 4,037 18,700 4,341 Uncemented liner with frac sleeves 19. PRESENT WELL CONDITION SUMMARY (To be completed for Redrill and Re -Entry Operations) Total Depth MD (ft): Total Depth TVD (ft): Plugs (measured): Effect. Depth MD (ft): Effect. Depth TVD (ft): Junk (measured): Casing Length Size Cement Volume MD TVD Conductor/Structural Surface Intermediate Production Liner Perforation Depth MD (ft): Perforation Depth TVD (ft): Hydraulic Fracture planned? Yes❑ No ❑ 20. Attachments: Property Plat ❑� BOP Sketch 7 Drilling Program Time v. Depth Plot ❑ Shallow Hazard Analysis El Diverter Sketch 0 Seabed Report ❑ Drilling Fluid Program 0 20 AAC 25.050 requirements0 21. Verbal Approval: Commission Representative: Date 22. 1 hereby certify that the foregoing is true and the procedure approved herein will not be deviated from without prior written approval. Contact Name: Aaron Donat Authorized Name: Chip Alvord Contact Email: aaron.donat@conocophillips.com Contact Phone: 265-1089 Authorized Title: Drilling Manager�l ,A( 612 I I-, Authorized Signature: Date: Commission Use Only Permit to Drill G l� API Number: _ _ ' % Permit Approval See cover letter for other Number: r fr 50- /�_ ' �L�' Date:olli III requirements. Conditions of approval : If box is checked, well may no used to explore for, test, or produce coalbed meths e, gas hydrates, or gas contained in shales: [ Other: * 3.504D amples req'd: Yes ❑ Nog. Mud log req'd: Yes El No[�J' y/ljCcTiO,4 G4NAv CAh IrC/G 2 1/Arr r/fl�'L1`'D/) Olin« ri �fju H2S measures: Yes ❑ NoFvf/ Directional svy req'd: Yes[ No E] lt'3 } ' ffc Spacing exception req'd: Yes [2` No❑ Inclination -only svy req'd: Yes ❑ No©' cG L�J�z�,��I1 Z 44c- Z-S'. 0 3s 01 � Z-� Post initial injection MIT req'd: Yes NoDiLk❑ ,��. � �° APPROVED BY Approved by: ( COMMISSIONER THE COMMISSION Date: C ""'ORIGINAL Submit Form and Form 10-401 Revised 5/2017 This permit is valid for 24 months from the date of approval per 20 AAC 25.005(g) Attachments in Duplicate CD4-594 Grass Roots Horizontal "Narwhal Lefty" Sand Injector Proposed Wellbore Schematic (4-String) (WP14) Conductor Installed: 20" set @ +/-108' DrllPlex 10 PPG ConocoPhillips Last Update: 08/28/19 - AJD 9 5/8" x 13 3/8" Liner hanger: 2,761' MD' Surface Casing: 13-3/8" 68# L-80 TXPM 2,911' MD / 2,397' TVD t�5 2 s 7 of JL LSND WBM 11 PPG LSND WBM 9.2 PPG (11 ppg w/ MPI G K-3 Sand Top: 13,244' MD / 3,843' TVD VersaPro OBM 8.2 PPG Narwhal Central Sand Top: 14,875' MD / 4,076' TVD Narwhal Lefty Sand Top: 15,428' MD / 4,160' TVD 16" Surface Hole I Tubing_ 12-1/4" Intermediate 1 Hole ± 14,629' 4-W' 12.6# L-80 TsBlue 711 1,c b c TOC @ " 8,345' MD / 3,197' TVD 7" x 9 5/8" Liner hanger: 10,107' MD' Intermediate 1: 9 5/8" 40#, L80, TXPM @ ± 10,257' MD / 3,447' TVD _ yiiv TOC @ 11,651' MD / 3,639' TVD (1,500' MD above K-3) 8-3/4" Intermediate 2 Hole 7" x 4-1/2" Permanent Packer /loot- ) 4-1/2" x 7" ZXP Liner Top Packer 14,629' MD 4-1/2" x 7" Baker Flex Lock Liner hanger Intermediate 2: 6-1/8„ Production Hole 7" 26#, L80, TXPM / Q i @ 14,779' MD / 4,061' TVD Production TD: D1 �S�ing Sleeve Production Liner: 4-1/2" 12.6# L-80 HYD563 14,629'-18,700' MD @ ± 21,562' MD / 4,212' TVD Perf Joint Perf Joint t ConocoPhillips Alaska, Inc. Post Office Box 100360 Anchorage, Alaska 99510-0360 ConocoPhillips Telephone 907-276-1215 August 30th, 2019 Alaska Oil and Gas Conservation Commission 333 West 7m Avenue, Suite 100 Anchorage, Alaska 99501 Re: Application for Permit to Drill CD4-594 Dear Sir or Madam: ConocoPhillips Alaska, Inc. hereby applies for a Permit to Drill an onshore exploratory delineation well from the CD4 drilling pad. The intended spud date for this well is October 1, 2019. It is intended that Doyon Rig 141 be used to drill the well. CD4-594 is planned to be a horizontal Narwhal sand injector. The 16" surface hole will TD above the C-30 sand and then 13-3/8" casing will be set and cemented to surface. The intermediate hole will be drilled in two sections to mitigate issues with formation instability over the long interval. The 12-1/4" intermediate 41 section will be drilled to below the C-10 sand and landed at an inclination of —82°. A 9-5/8" liner string will be set and cemented from TD to secure the shoe and cover 250' TVD above any hydrocarbon -bearing zones. The 9-5/8" liner will then be temporarily tied back to surface. A planned 8-3/4" pilot hole (CD4-594PHI will then be drilled out of the 9-5/8" shoe down to the Narwhal sand to locate the formation top and assess the formation via LWD. Managed Pressure Drilling technology will also be utilized to assist with ECD management while penetrating the Narwhal sand. This interval will build from 82' to 86' inclination before dropping to 55° inclination through the Narwhal sand. The pilot hole will subsequently be plugged back to the 9-5/8" liner shoe. w� MA-1- Td°� '. r"J— The second intermediate will then kick-off the pilot plugback with a 8-3/4" steerable drilling assembly, ultimately landing 15' TVD above the Narwhal Central sand at an inclination of —81 °. A 7" liner string will be set and cemented from TD to secure the shoe and cover 1500' MD above any hydrocarbon -bearing zones. The previously installed 9-5/8" tie back will be removed and the 7" liner will then be tied back to surface. The production interval will be comprised of a 6-1/8" horizontal hole that will be geo-steered in the Narwhal Lefty sand. Once the Lefty sand pinches out, the well will be steerd up to penetrate the Narwhal Central sand. The well will be completed as a stimulated innjector with 4- 1/2" liner with frac sleeves and tied back to surface with a 4-1/2" tubing upper completion string. The well will be tied into exisiting CD4 falicilities and utilized to contuct an interference test with CD4-595. If appropriate injection rates cannot be achieved, the well with be hydraulically fractured. It is requested that a variance of the diverter requirement under 20 AAC 25.035 (h) (2) is granted for well CD4-594. At CD4, there has not been a significat indication of shallow gas hydrates through the surface hole interval. It is also requested that a variance from 20 AAC 25.035.e.10.13 regulation of weekly BOPE test for exploration wells is granted to allow Doyon 141 to follow a bi-weekly BOPE test for CD4-594. Please find attached the information required by 20 ACC 25.005 (a) and (c) for your review. Pertinent information attached to this application includes the following: 1. Form 10-401 APPLICATION FOR Permit to Drill per 20 ACC 25.005 (a) 2. A proposed drilling program 3. A proposed completion diagram 4. A drilling fluids program summary 5. Pressure information as required by 20 ACC 25.035 (d)(2) 6. Directional drilling / collision avoidance information as required by 20 ACC 25.050 (b) Information pertinent to the application that is presently on file at the AOGCC: 1. Diagrams of the BOP equipment, diverter equipment and choke manifold lay out as required by 20 ACC 25.035 (a) and (b). 2. A description of the drilling fluids handling system. 3. Diagram of riser set up. If you have any questions or require further information, please contact Aaron Donat at 265-1089 (aaron.donat@conocophillips.com) or Chip Alvord at 265-6120. Sincerely, cc: C134-595 Well File / Ann Haggerty-Sherrod ATO 1530 Chip Alvord ATO 1570 Lanston Chin Kuukpik Corp Aaron Donat Senior Drilling Engineer Permit It - CD4-594 Application for Permit to Drill Document Table of Contents Application for Permit to Drill, Well CD4-594 Saved: 29-Aug-19 ♦pub i` '.i. Maxwell M0xirnize Well value .......................................................................................................................................................... 2 1. Well Name.................................................................................................................. 2 Requirements of 20 AAC 25.005 (fl............................................................................................................. 2 2. Location Summary......................................................................................................2 Requirements of 20 AAC 25.005(c) (2)......................................................................................................... 2 Requirements of 20 AAC 25.050(b)............................................................................................................. 3 3. Blowout Prevention Equipment Information...............................................................3 Requirements of 20 AAC 25.005(c)(3)......................................................................................................... 3 4. Drilling Hazards Information...................................................................................... 3 Requirements of 20 AAC 25.005 (c)(4)........................................................................................................ 3 5. Procedure for Conducting Formation Integrity Tests...................................................4 Requirements of 20 AAC 25.005 (c)(5)........................................................................................................ 4 6. Casing and Cementing Program..................................................................................4 Requirements of 20 AAC 25.005(c)(6)......................................................................................................... 4 7. Diverter System Information....................................................................................... 4 Requirements of 20 AAC 25.005 c 7 .............................. 4 8. Drilling Fluid Program................................................................................................ 5 Requirements of 20 AAC 25.005(c)(8)......................................................................................................... 5 9. Abnormally Pressured Formation Information............................................................ 6 Requirements of 20 AAC 25.005 (c) (9)........................................................................................................ 6 10. Seismic Analysis.......................................................................................................... 6 Requirements of 20 AAC 25.005(c)(10)....................................................................................................... 6 11. Seabed Condition Analysis.......................................................................................... 6 Requirements of 20 AAC 25.005(c)(11)....................................................................................................... 6 12. Evidence of Bonding.................................................................................................... 6 Requirements of 20 AAC 25.005(c)(12)....................................................................................................... 6 13. Proposed Drilling Program.........................................................................................6 CD4-594 APD Prepared by. Aaron Donat Page 1 of 9 Printed: 29-Aug-19 Appncation for Permit to Drill, Well CD4-594 Saved: 29-Aug-19 Requirements of 20 AAC 25.005(c)(13)....................................................................................................... 6 14. Discussion of Mud and Cuttings Disposal and Annular Disposal .................................. 9 Requirements of 20 AA 25.005(c)(14)....................................................................................................... 9 15. Attachments................................................................................................................9 Attachment1: Location Maps..................................................................................................................... 9 Attachment 2: Directional Plan................................................................................................................... 9 Attachment 3: Drilling Hazards Summary....................................................................................................9 Attachment 4: Cement Summary................................................................................................................. 9 Attachment 5: Shallow Hazard and Pore Pressure Conclusions..................................................................... 9 Attachment 5: Seismic Analysis................................................................................................................... 9 Attachment6: Well Schematic.................................................................................................................... 9 Attachment7: BOP Equipment................................................................................................................... 9 Attachment 8: Wellhead Schematic............................................................................................................. 9 1. Well Name Requirements of 20 AA 25.005 (fl Each well must be identified by a unique name designated by the operator and a unique API number assigned by the commission under 20 AAC 25.040(b). For a well with multiple well branches, each branch rnust similarly be identified by a unique name and API number by adding a suffix to the name designated for the well by the operator and to the number assigned to the well by the commission. The well for which this application is submitted will be designated as CD4-594. This will bean exploratory delineation well. 2. Location Summary Requirements of 20 AA 25.005(c) (2) An application for a Permit to Drill must be accompanied by each of the following items, except for an item already on file with the commission and identified in the application: (2) a plat identifying the property and the property's owners and showing (4)the coordinates of the proposed location of the well at the surface, at the top of each objective formation, and at total depth, referenced to governmental section lines. (B) the coordinates of the proposed location of the well at the surface, referenced to the state plane coordinate system for this state as maintained by the National Geodetic Surrey in the National Oceanic and Atmospheric Administration: (C) the proposed depth of the well at the top of each objective formation and at total depth: and (D) other information required by 20 AAC 25.050(b): Location at Surface 2853' FNL, 4915' FEL, Sec 19, Twn I 1 N, Rg 5 E MAD 27 Northings: 5,957,553 Eastings: 378,291 RKB Elevation 47' AMSL Pad Elevation 19' AMSL Location at Top of Productive Interval Heel 4164' FNL, 4274' FEL, Sec 28, Twn 11 N, Rg 5 E NAD27 Northings: 5,950,790 Eastings: 389,411 Measured Depth, RKB: 14,875' Total Vertical Depth, RKB: 4,076' Total Vertical Depth, SS: 4,029' Location at Total Depth Toe 4600' FNL, 870' FEL, Sec 33, Twn 11 N, Rg 5 E NAD 27 Northings: 5,945,025 Eastings: 392,746 Measured Depth, RKB: 21,562' Total Vertical Depth, RKB: 4,212' Total Vertical Depth, SS: 4,165' CD4-594 APD Prepared by: Aaron Donat Page 2 of 9 Printed: 29-Aug-19 Application for Permit to Drill, Well CD4-594 Saved: 29-Aug-19 Plats showing the CD4 Pad Configuration with Doyon 141 are included. Please refer to Attachment 1: Location Maps. Requirements of 20 AAC 25.050(b) /7a well is to be intentionally deviated, the application for a Permit to Drill (Form 10401) must (1) include a plat, drmrn to a suitable scale, showing the path of the proposed wellbore, including all adjacent wellbores within 200 feet of any portion of the proposed well: Please refer to Attachment 2: Directional Plan. and (2) for all wells within 200 feet of the proposed wellbore (A) list the mines of the operators of those wells. to the extent that those names are known or discoverable in public records, and shmw that each named operator has been furnished a copy of the application by certified mail; or (B) state that the applicant is the only affected owner. The applicant is the only affected owner. r ; PAI Blowout Prevention Equipment Information Requirements of 20 AAC 25.005(c)(3)ftr An application for a Permit to Drill must be accompanied by each of the following items, except or an item ab• ady on file with the commission and identified in the application: (3) a diagram and description of the blowout prevention equipment (BOPS) as required by 20 AAC 25.035, 20 AAC 25.036, or 20 AAC 25.037, as applicable; Please reference BOP schematics for Doyon 141 in Attachment 7: BOP Equipment. ConocoPhillips is requesting a variance from 20 AAC 25.035.e.103 regulation of weekly BOPE test for exploration wells to allow Doyon 141 to follow a bi-weekly BOPE test for CD4-594. ConocoPhillips believes this variance to be justified for the following reasons: 1. Doyon 141 will be a warm rig when it begins operations on C134-594. The rig has been in service since October 2018 and has been participating in the CPAI between well maintenance program. 2. Although this well is being permitted as an exploration well, it is being drilled within the CRU development field. Unlike remote exploration wells that require ice pads, CD4-594 is being drilled offthe existing CD4 gravel pad in the Alpine field with access to Alpine infrastructure and Alpine spill response equipment. Additionally, CD4-594 is covered under the current Alpine C-Plan 3. Unlike CD4-595, which was the first well of an exploratory appraisal program, the CD5-494 well will offset CD4-595, making all zones of known pressure and depth. 4. Drilling Hazards Information Requirements of 20 AAC 25.005 (c)(4) An application for a Permit to Drill must be accompanied by each of the following items, except for an item already on file with the commission and identified in the application: (4) information on drilling hazards, including (A) the maximunt dmvnhole pressure that may be encountered, criteria used to determine it, and maximum potential surface pressure based on a methane gradient; Expect 1947 psi formation pressure @ base of Narwhal Lefty Sand of 4342' TVD. Equivalent Mud Weight @ Narwhal Lefty Sand = 1947 psi / (4160'*.052) = 9.0 ppg The maximum potential surface pressure (MPSP) while drilling CD4-594 is calculated using the predicted 1947 psi reservoir pressure, a 0.10 psi/ft gas gradient and Narwhal Central sand top TVD of 4160' ft. Narwhal Sand Estimated BHP = 1,947 psi Narwhal Sand estimated depth (WP10) = 4,160' TVD Gas Gradient = 0.10 psi/ft as per 20 AAC 25.005 (c)(4)(A) Hydrostatic of full gas column = 416 psi (4,160' TVD * 0.10 psi/ft) MPSP = BHP — gas column = 1,531 psi (1,947 psi — 416 psi) CD4-594 APD Prepared by. Aaron Donat Page 3 of 9 Printed: 29-Aug-19 Application for Permit to Drill, Well CD4-594 Saved: 29-Aug-19 (B) data on potential gas :ones: The wellbore is not expected to penetrate any gas zones. and (C) data concerning potential causes of hole problems such as abnormally geo pressured strata, lost circulation zones. and zones that have a propensity for differential sticking: The location of the CD4-594 wellpath is close in proximity to the recently drilled CD4-595 well. The previously conducted Shallow Hazard and Pore Pressure Study for CD4-595 combined with extensive drilling experience on CD4 pad suggests that no significant hole problems are to be expected. Please refer to Attachment 3: Drilling Hazards Summary. 5. Procedure for Conducting Formation Integrity Tests Requirements of 20 AAC 25.005 (c) (5) An application for a Permit to Drill must be accompanied by each of the following items, except for an item already on file with the commission and identified in the application: (5) a description of the procedure for conducting formation integrity tests, as required under 20 AAC 25.03069; Drill out surface casing shoe and perform LOT or FIT in accordance with the Alpine LOT / FIT procedure that ConocoPhillips Alaska has on file with the Commission. 6. Casing and Cementing Program Requirements of 20 AAC 25.005(c)(6) An application for a Permit to Drill must be accompanied by each of the following items, except for an item already on file ivith the commission and identified in the application: (6) a complete proposed casing and cementing program as required by 20 AAC 25.030, and a description of any slotted liner, pre perforated liner. or street[ to be installed: As Casing and Cementing Program Csg1Tbg Hole weight Grade Conn. Length Top MD/TVD Btm MD/TVD Cement Program OD (in) Sze (Ib/ft) (ft) (ft) (ft) 20 42 154 X-65 Welded 80 Surf 105 / 105 Cemented to surface with 11 yds slurry 13-3/8 16 68 L-80 TXPM 2,864 Surf 2,911 / 2,397 1319 sx 15.8 ppg DeepCRETE Lead, 'G' 330 sx 15.8 ppg Class Tail 9-5/8 12-1/4 40 L-80 TXPM 7,496 2,761 / 2,336 10,257 / 3,447 767 sx 15.8ppg Class 'G' Abandoned with 3-1/2" Sacrificial Tubing String: OI 8-3/4 - - - - - - 1421 sx 15.8 ppg Class 'G' Tail 700' Kck Off Plug (10757— 10057): 357 sx 17 ppg 7 8-3/4 26 L-80 TXPM 14,732 Surf 14,779 / 4,061 282 sx 13 ppg Extended Lead, 113 sx 'G' 15.8ppg Class Tail 4-1/2 6-1/8 12.6 L-80 HYD563 4,071 14,629 / 4,037 18,700 / 4,341 Uncemented open hole liner w/ frac sleeves Please refer to Attachment 4: Cement Summary 7. Diverter System Information Requirements of 20 AAC 25.005(c)(7) An application for a Permit to Drill must be accompanied by each of the following items, except for an item already on f le with the commission and identified in the application: (7) a diagram and description of the diverter system as required by 20 AAC 25.035, unless this requirement is waived by the commission under 20 AAC 25.035(h)(2): CD4-594 APD Prepared by. Aaron Donat Page 4 of 9 Printed: 29-Aug-19 Application for Permit to Drill, Well CD4-594 Saved: 29-Aug-19 It is requested that a variance of the diverter requirement under 20 AAC 25.035 (h)(2) is granted. At CD4, there has not been a significant indication of shallow gas or gas hydrates through the surface hole interval. There are 5 previously drilled wells (CD4-289, C134-298, CD4-302, C134-290, CD4-291) within 500' of the proposed CD4-594 surface shoe location. None of these wells encountered any significant indication of shallow gas or gas hydrates. 8. Drilling Fluid Program Requirements of 20 AAC 25.005(c)(8) An application for a Permit to Drill must be accompanied by each of the following items, except for an item already on file with the commission and identified in the application: (8) a drilling/laid program, including a diagram and description of the drilling,/luid system, as required by 20 AAC 25.033; Diagram of Doyon 141 mud system on file with AOGCC. Drilling fluid practices will be in accordance with appropriate regulations stated in 20 AAC 25.033. Mud Program Summary Surface 1051— 2911' Mud Type DRILPLEX AR Density 10.0 Funnel Viscosity seconds NA Yield Point 35-80 API Fluid Loss m1130min NA H 9.5-10.8 Intermediate I 2911'—10257' Mud Type LSND Density 11.0 ✓ PV 10-15 Yield Point 25-40 API Fluid Loss m1130min <10 H 9.5-10.0 Pilot 10257'—15100' Mud Type LSND Density 9.2 ✓ PV 10-15 Yield Point 20-30 API Fluid Loss m1130min <10 H 9.5-10.0 Intermediate II 10257'—14779' Mud Type LSND Density 9.2 PV 10-15 Yield Point 20-30 API Fluid Loss m1130min <10 H 9.5-10.0 Production 14779' — 21562' Mud Type VERSAPRO MOBM Density 8.0 PV 15-20 Yield Point 13-18 .)/ Af-�-'> CD4-594 APD Prepared by. Aaron Donat Page 5 of 9 Printed: 29-Aug-19 Application for Permit to Drill, Well CD4-594 Saved: 29-Aug-19 API Fluid Loss m1130min NA H NA 9. Abnormally Pressured Formation Information Requirements of 20 AAC 25.005 (c) (9) An application for a Permit to Drill must be accompanied by each of the following items, except for an item already on file with the commission and identified in the application: (9) for an exploratory or stratigraphic test well, a tabulation setting out the depths of predicted abnormally geo pressured strata as required by 20 AAC 25. 033(n The location of the CD4-594 wellpath is close in proximity to the recently drilled CD4-595 well. The previously conducted Shallow Hazard and Pore Pressure Study for C134-595 combined with extensive drilling experience on CD4 pad suggests that no abnormally geo-pressured strata will be encountered. Additionally, mud logging services will be used on this well. Please refer to Attachment 5: Shallow Hazard and Pore Pressure Conclusions. 10. Seismic Analysis Requirements of 20 AAC 25.005 (c)(10) An application for a Permit to Drill must be accompanied by each of the following items, except for an item already on file with the commission and identified in the application: (10) for an exploratory or stratigraphic test well, a seismic refraction or reflection analysis as required by 20 AAC 25.061(a): The location of the CD4-594 wellpath is close in proximity to the recently drilled C134-595 well. The previously conducted Shallow Hazard and Pore Pressure Study for C134-595 was utilized for seismic analysis. Additionally, mud logging services will be used on this well. Please refer to Attachment 5: Shallow Hazard and Pore Pressure Conclusions. 11. Seabed Condition Analysis Requirements of 20 AAC 25.005 (c)(11) An application for a Permit to Drill must be accompanied by each of the following items, except for an item already on file with the commission and identified in the application: (I I) for a well drilled from an offshore platform, mobile bottom founded structure, jack -tip rig, or f oating drilling vessel, an analysis of seabed conditions as required by 20 AAC 25.061(b): N/A - Application is not for an offshore well. 12. Evidence of Bonding Requirements of 20 AAC 25.005 (c)(12) An application for a Permit to Drill must be accompanied by each of the following items, except for an item already on file with the commission and identified in the application: (12) evidence showing that the requirements of 20 AAC 25.025 {Bonding)have been met; Evidence of bonding for ConocoPhillips Alaska, Inc. is on file with the Commission. 13. Proposed Drilling Program Requirements of 20 AAC 25.005 (c)(13) An application for a Permit to Drill must be accompanied by each of the following items, except for an item already on file with the commission and identified in the application: The proposed drilling program for C134-594 is listed below. Please refer also to Attachment 6: Well Schematic. 1. Install landing ring on conductor on existing 20" conductor. Conductor set at 105' RK13. 2. Move in / rig up Doyon Rig 141 on conductor. _ 3. Pick up 5-7/8" DP and prepare surface drilling fluid. a; u CD4-594 APD Prepared by. Aaron Donat Page 6 of 9 Printed: 29-Aug-19 Application for Permit to Drill, Well CD4-594 Saved: 29-Aug-19 4. Spud and directionally drill 16" hole to casing point at +/-2,91 V MD / 2,397' TVD as per directional plan. Run MWD / LWD logging tools in drill string as required for directional monitoring and formation data gathering. 5. Run and cement new 13-3/8" 68# L-80 TXPM casing to surface. Centralize surface casing with 1 solid body centralizer per joint on fast three joints and then 1 solid body centralizer every 41h joint to within 100' of conductor shoe (205'MD). Adequate excess cement will be pumped to ensure cement reaches the surface during the cement job. Displace cement with mud and check floats upon bumping plug. If cement returns area �i w not seen at surface, run a 3/4" string into surface casing by conductor annulus to locate top of cement. Once top of cement is located, record this depth and perform a top job to bring cement to surface. p 6. Install wellhead and test to 1000 psi. Nipple up BOPE, install 3-1/2" x 6" VBR's, and test to 250 / 3500 psi. Notify AOGCC 48 hrs before test. t� 7. PU 12-1/4" bit and rotary steerable drilling assembly. RIH, clean out cement to top of float equipment and test casing to 2600 psi for 30min. Run MWD / LWD logging tools in drill string as required for directional monitoring and formation data gathering. 8. Drill out cement and 20' minimum to 50' maximum of new hole. Perform FIT up to 15 O�pg EMW (minimum acceptable 12.5 ppg EMW). 9. Directionally drill 12-1/4" hole to +/-6,600' MD / 2,969' TVD. Run MWD/LWD logging tools in drill string as required for directional monitoring and formation data gathering. 10. Circulate wellbore clean and backream out of the hole to +/- 1,500' MD. RIH and wash to bottom. 11. Directionally drill 12-1/4" hole to casing point at +/-10,257' MD / 3,447' TVD. Run MWD/LWD logging tools in drill string as required for directional monitoring and formation data gathering. 12. Circulate wellbore clean and backream out of the hole to +/- 1,5001MD. Continue out of hole on elevators and lay down BHA. �Tz�'u P 5„ 13. Close blind RAMS, change out upper 3-1/2" x 6" VBR's to 9-5/8" RAMS, test to 250 (3&Wpsi. 14. Rig up and run new 9-5/8" 40# L80 TXPM casing, hanger and liner top packer on 5-7/8" DP. Centralize casing with 1 solid body centralizer on bottom three joints followed by 1 solid body centralizer on every other joint from this point to planned top of cement. 15. Rig up and pump cement as per program. Displace cement with mud, check floats upon bumping plug. Top of cement to be +/-8,345' MD / 3,197' TVD which is +/- 250' TVD above the intermediate I casing shoe. 16. Rig up and run 9-5/8" 40# L80 TXPM tie -back. Prior to stinging into the seal bore extension, displace 9-5/8" x I ` 13-3/8" annulus to fresh water and freeze protect with diesel. 17. Pick up 8-3/4" bit and rotary steerable assembly on 4" x 5" tapered DP string. RIH, clean out cement to top of float equipment and test casing to 2900 psi for 30min. 18. Drill out cement and 20' minimum to 50' maximum of new hole. Perform FIT up to 16 ppg EMW (minimum acceptable 12.5 ppg EMW). r 19. Install Managed Pressure Drilling (MPD) bearing assembly and displace to 9.2 ppg drilling fluid holding near constant bottom hole pressure of 11 ppg for the rest of the section. 20. Directionally drill 8-3/4" pilot hole to TD at +/-15,100' MD / 4,847' TVD. Run MWD/LWD logging tools in oa drill string as required for directional monitoring and formation data gathering. 21. Circulate well clean and perform formation pretests via LWD as needed to acquire formation pressure across Narwhal interval. 22. Weight up to 11 ppg for wellbore stability, flow check and backream�t of hole to +/- 1,500' MD. Continue � out of hole on elevators and lay down BHA. cef—L'L 23. Pick up—4,300' of 3.5" sacrificial tubing below di connect tool with an additional —1200' of 3.5" tubing above. Run in hole to TD on DP. Rig up and pump cement, drop disconnect dart and continue to displace with rig pumps. Use 10-20 rpm during displacement. Once plug latches in disconnect tool, pressure up and disconnect from sacrificial tubing string. OC to reach 100 psi compressive strength and tag top of cement to confirm placement. Notify AOGCC in ector to witness tag. CD4-594 APD Prepared by: Aaron Donat ,� y_, Page 7 9 Printed: 29-Aug-19 Application for Permit to Drill, Well CD4-594 Saved: 29-Aug-19 24. POOH and pump gel pill followed by a -700' kickoff plug leaving TOC -200' up inside the surface casing shoe. 25. POOH with DP and lay down 3.5" cement stinger and disconnect tool. 26. Pick up 8-3/4" bit and rotary steerable assembly. RIH, dress off cement plug and sidetrack as per directional / program. 27. Install Managed Pressure Drilling (MPD) bearing assembly and displace to 9.2 ppg drilling fluid holding near constant bottom hole pressure of 11 ppg for the rest of the section. Jdl 28. Directionally drill 8-3/4" Intermediate II hole to casing point at +/-14,779' MD / 4,061' TVD, landing 15' TVD above top of Narwhal Central Sand. Run MWD/LWD logging tools in drill string as required for directional monitoring and formation data gathering. 29. Circulate well clean, flow check and backream out of hole to 1,500' MD. Continue out of hole on elevators and lay down BHA. 30. Rig up and run new 7" 26# L80 TXPM casing, hanger and liner top packer on 4" DP. Centralize casing with 1 solid body centralizer on bottom three joints followed by 1 solid body centralizer on every other joint from this point to planned top of cement. 31. Rig up and pump cement asp ro ram Displace cement with mud, check floats upon bumping plug. Top of cement to be +/-] 1,65 V ME(/ 3,639' TV9 which is +/- 1500' MD above top of uppermost hydrocarbon bearing l zone. �7& r ✓v 32. Rig up and null 9-5/8" tie -back. Lay down 9-5/8" casing and hanger to pipe shed. 33. Rig up and run 7" 26# L80 TXPM tie -back. Prior to stinging into the seal bore extension displace 7" x 9-5/8" x 13-3/8" annulus to corrosion sea water and freeze protect with diesel. °--� 'T 5# V.."- 7 `'? 34 35 Pick up 6-1/8" Bit and rotary steerable drilling assembly. RIH and cleat out cement to top of float equipment Test casing t Sq„� si for 3 mmin. gam, l esF (7 k IT S/_ " f(N+Q� Z Sr✓r� �s /) DAI out cement an� minimum to 9R maximum of new hole. Perform LOT (minimum acceptable 12 ppg EMW). Displace to 8 ppg MOBM drilling fluid. v 36. Directionally drill 6-1/8" hole into the Narwhal Lefty Sand to TD at +/- 21,562' MD / 4,212' TVD as per directional plan. Run MWD/L WD logging tools in drill string as required for directional monitoring and �L formation data gathering. 37. Circulate well clean, flow check and backream out of hole to intermediate II shoe. . 38. Displace to KW fluid and observe well for flow. Trip out of hole on elevators and lay down BHA. C 39. PU and run 4-1/2" 12.6# L80 HYD563 lower completion, lining only the Narwhal Le sand 18 700' p g Y Lefty (� )• � 40. PU and run 4-1/2" 12.6# L80 HYD563 tubing upper completion, circulate around with kill weight brine. ^ 41. Landtubing. i SY TA /�b� 42. Nipple down BOPE, nipple up tree and test agains �, t„I, 2�� +^� tut T` J-n 43. Freeze protect 4-1/2" x 7" annulus with diesel.v�`'" 8c / 44. Set BPV, secure well and move rig off. ` p� .T- 45. After Rig is off location, injection testing will commence. If appropriate injection rates cannot be ach� ettd, the well will he hydraulically fractured. _ CD4-594 APD Prepared by. Aaron Donat Page 8 of 9 Printed. 29-Aug-19 Application for Permit to Drill, Well CD4-594 Saved: 29-Aug-19 14. Discussion of Mud and Cuttings Disposal and Annular Disposal Requirements of 20 AA 25.005 (c)(14) An application for a Permit to Drill music be accompanied by each of the following items, except for an item already on file with the commission and identified in the application: (14) a general description of how the operator plans to dispose of drilling mud and cuttings and a statement of whether the operator intends to request authorisation under 20 AAC 25.080 for an annular disposal operation in the well.; Drill cuttings and drilling mud form the well will be disposed of by hauling to Prudhoe Bay, Kuparuk or Alpine where they will be disposed at an approved facility. Prior to hauling, the cuttings will be temporarily stored in an ice-bermed drilling storage cell on the pad. The volume of waste placed in each storage cell and snow accumulation in each cell will be minimized. Upon completion of activities at the well site, the ice-bermed drilling waste storage cells will be broken up and hauled to Alpine, Prudhoe Bay or Kuparuk for disposal at an injection well. Drilling waste liquids will also be hauled to Alpine, Kuparuk or Prudhoe Bay for injection in an approved Class It disposal well. 15. Attachments Attachment 1: Location Maps Attachment 2: Directional Plan Attachment 3: Drilling Hazards Summary Attachment 4: Cement Summary Attachment 5: Shallow Ha=ard and Pore Pressure Conclusions Attachment 5: Seismic Analysis Attachment 6: Well Schematic Attachment 7: BOP Equipment Attachment 8: Wellhead Schematic CD4-594 APD Prepared by. Aaron Donat Page 9 of 9 Printed: 29-Aug-19 f •- a a I a a a n r # o V o I'VN0� V IcD4a a Y EAST NES PIP A m I N � � we urooM ris. e �. rac* CHEMICAL �. uart / ECTION ,� M INJ RIP—RAP CHEMICAL 6 TANK FARM C04F r-pj PRODUCTION \\\\ HEATER EROSION CONTROL z BAGS % `t,. TEST \, CD4G SEPARATOR 'fir t -FUEL SKID Wr PIGGING END MODU E I fi RIP —RAP O =� CD4C DRILL SITE PLOT PLAN DRAWN BY: ALKET MICI (8.53 ACRES) 25 50 100 FT. " SO P�p�NE ConocoPhillips j CD4 LAYOUT DRAWING Alaska, Inc. 11"07' Not to Scale DRAWN BY: ALKET MICI DATE: 06/28/2019 REV: 1 12:16, Aug.St 26 2019 DDI CD4-594PH1 wp13 6.748 Plan Summar 13-3/8 x 16 9- 5/8 x 12-1/4 8 3/4 OH >� 7 m 5 -- W �O I , �1 0 r 0 0 3000 6000 9000 12000 15000 Measured Depth O goo 19+27+1 @ 47.00usft (D141) I I o o 0 0 „ 8 3/4 OH o �' ^ o0 0 o 0 oQ . -Fa o o -E N 13-3/8 x 19 „may 9�5/8x1/4 r 0 28 _.. _.. 300 0 2000 4000 6000 8000 10000 12000 CD4 D ePa1 300 - 490 Horizontal Departure CD493A 490 - 670 s70 860 860 1040 4-59 04-2d l 1040 - 1230 o -- 300 y //Y 6 60 230 1410 ° 55 - - / - - - 1? 1410 - 1600 CD4- _ CD 1600 2160 � 2160 2730 1 04- 2730 - 3290 CD4- B Equivalent Magnetic Distance 3290 - 3850 70 _ 90 3850 - 4410 DID 4410 - 4970 CD_4 ',. ! 4970 - 5540 1 4-499 a 5540 - 6100 U 6100 - 7230 0 7230 - B350 400 800 1200 1600 2000 2400 2800 2 cc) 6 120 8350 - 9480 Measured Depth 9480 - 10600 SURVEY HH(JUKAM 9 10600 - 11730 11730 12850 Depth From Depth To Survey/Plan Tool 210 150 12850 "-"""�" 13980 28.00 1600.00 CD4-594PH1 wpl3 GYD-GC-SS DD - PHI 13980 15101 1600.00 2900.00 CD4-594PH1 wp13 MWD OWSG 180 MOM 2900.00 CD4-594PH1 wp13 MWD+IFR2+SAG+MS TVD MD Name 2900.00 4400.00 CD4-594PH1 wp13 MWD OWSG 2397.00 2910.87 13-3/8 x 16 10250.00111750: 0 C04-594PHI wpM 13 WD+OWSG AG+MS 3447.00 10256.74 9- 5/8 x 12-1/4 Magnetic Model & Date: BGGM2018 01-Nov-19 10250.0015100.61 C04-594PH1 wp13 MWD+IFR2+SAG+MS 4847.00 15100.61 8 314 OH Magnetic North is 15.960 East of True North (Magnetic Declination) Magnetic Dip & Field Strength: 80.720 57367nT Sec MD Inc Azi TVD +N/-S +E/-W Dleg TFace VSecl Target Annotation 1 28.00 0.00 0.00 28.00 0.00 0.00 0.00 0.00 0,00 KOP: Start 1.25°/100' DLS, 103.6° TF, for 200' Lithology Column 2 300.00 0.00 0,00 300.00 0.00 0.00 0.00 0.00 0.00 Start 2°/100' DLS, 0° TF, for 200' 3 500.00 2.50 103.60 499.94 -1.03 4.24 1.25 103.60 4.16 Start 2.75`/100' DLS, 0° TF, for 451.65 4 700.00 6.50 103.60 699.28 -4.71 19.49 2.00 0.00 19.14 Hold for 105,71' 5 1151.65 18.92 103.60 1139.00 -28.04 115.89 2.75 0.00 113.81 Start 3°/100' DLS, 0° TF, for 1653,51' i2se o 6 1257.36 18.92 103.60 1239.00 _36.10 149.20 0.00 0.00 146.53 Hold for 20' 7 2910.87 68.53 103.60 2397.00-296.52 1225.65 3.00 0.00 1203.70 Start 3-/100' DLS, 45- TF, for 490' 8 2930.87 68.53 103.60 2404.32-300.89 1243.74 0.00 0.00 1221.47 Start 2.1100- DLS, 68.59° TF, for 434.52' 9 3420.87 79.21 114.12 2540.61-453.71 1687.42 3.00 45.00 1680.59 Hold for 6401.35' Base Permal 10 3855.39 82.49 122.28 2609.81-656.37 2065.03 2.00 68.59 2106.67 Adjust TF to 0", for 50' 11 10256.74 82.49 122.28 3447+00-4045.84 7430.46 0.00 0.00 8453.29 CD4-594PH1 Csg Tgl wpl1 Start 3°/100' DLS, 45.4° TF, for 166.3 1210306.74 82.49 122.28 3453.54-4072.32 7472.37 0.00 0.00 8502.85 Hold for 2035.33 1310473.04 86.00 125.84 3470.22-4164.97 7609.40 3.00 45.40 8668.01 Start Y/100' DLS,-178.66" TF, br 1033.6T zise.o 1412508.37 86.00 125.84 3612.19-5353.81 9255.32 0.00 0.0010690.96 Hold for 380' C-40 1513542.04 55.00 125.00 3953.04-5912.23 10039.31 3.00-178.6611650.49 Adjust TF to 0', for 1178,57' z42s.o 1613922.04 55.00 125.00 4171.00-6090.77 10294.29 0.00 0.0011960.99 CD4-594PH1 Tgt 01 TD: 15100.61' MD, 484T TVD C-30 1715100.61 55.00 125.00 4847.00-6644.52 11085.12 0.00 0,0012923.99 TD at 15100.61 z�sz.o C-20 zsazo .r Permit Pack C-10 .44.o K-3 4-11)p Narwhal Top Narwhal r] s2,-2 By signing this I acknowledge that I have been informed of all risks, checked that the data is correct, ensured it's completeness, and all surrounding wells are assigned to the proper position, and I approve the scan and collision avoidance plan as set out in the audit pack.) approve it as the basis for the final well plan and wellsite drawings. I also acknowledge that unless notified otherwise all targets have a 100 feet lateral tolerance. repared by hecked by ccepted by Approved by: S. DeLapp V. Osara J. Ryan CoP DE 13:07, Au List 26 2019 CD4-594PH1 wp13 10307.00 To 21562.58 Spider c 0 0 v c -= 0 z,42 Easting (4500 usft/in) C 4-07 CD - CD -208 CD -301 B C - 4D4-1 CD -208PB CD4-3 D4- 10 D4- 04 CD4- - CD4- CD4-30 A D4-32 PB1 i Han CD4 ' i C 4- 18A 2 D - 3 C 13:", August 26 2019 CD4-594PH1 wp13 39.00 To 25879.57 Spider PB1 Easting (200 usfVin) 1 -1500 0 1500 a m 0 Cz U E U a� 3000 4500 �:YIIIII] CD4-594PH1 wp13 Section View 1500 3000 4500 6000 7500 9000 10500 12000 Vertical Section at 120.940 CD4-594PH1 wp13 Plan View While drilling production section, stay within 100 feet laterally of plan, unless notified otherwise. 0 0 0 0 0 0 M _ � 000 b O° 13-3/8 x 16 h° -1500 00 00 + C05 g3000 _o° z ° o0 o .° -4500 ° 9- 5/8 x 12-1/4 h 00 -6000 83/4OH 0 1500 3000 4500 6000 7500 9000 10500 West( -)/East(+) ConocoPhillips Alaska Inc_WNS Western North Slope CD4 Nanuq Pad Plan: C134-594 50103xxxxx00 CD4-594PH1 Plan: CD4-594PH1 wp13 Standard Proposal Report 26 August, 2019 s r ConocoPhilllp ConocoPhillips Database: EDT 14 Alaska Production Company: ConocoPhillips Alaska Inc_WNS Project: Western North Slope Site: CD4 Nanuq Pad Well: Plan: CD4-594 Wellbore: CD4-594PH1 Design: CD4-594PH1 wp13 ConocoPhillips Standard Proposal Report Local Co-ordinate Reference: Well Plan: CD4-594 TVD Reference: 19+27+1 @ 47.00usft (D141) MD Reference: 19+27+1 @ 47.00usft (D141) ' North Reference: True , Survey Calculation Method: Minimum Curvature Project Western North Slope, North Slope Alaska, United States System Datum: Mean Sea Level Using Well Reference Point Using geodetic scale factor Site CD4 Nanuq Pad Site Position: From: Map Position Uncertainty: 0.00 usft Slot Radius: 0.000 in Well Plan: CD4-594 Well Position +N/-S 29.29 usft +E/-W 116.18 usft Position Uncertainty 0.00 usft Ground Level: 19.00 usft Wellbore CD4-594PH1 Magnetics Model Name Sample Date Declination Dip Angle Field Strength (nT) BGGM2018 11 /1 /2019 15.96 80.72 57,367 Design CD4-594PH1 wp13 Audit Notes: Version: Phase: PLAN Tie On Depth: 28.00 Vertical Section: Depth From (TVD) +N/-S +E/-W Direction (usft) (usft) (usft) (°) 28.00 0.00 0.00 120.94 8/26/2019 2:03:24PM Page 2 COMPASS 5000.14 Build 85H ConocoPhillips ConocoPhillips Standard Proposal Report Database: EDT 14 Alaska Production Local Co-ordinate Reference: Well Plan: CD4-594 Company: ConocoPhillips Alaska Inc_WNS TVD Reference: 19+27+1 @ 47.00usft (D141) Project: Western North Slope MD Reference: 19+27+1 @ 47.00usft (D141) Site: CD4 Nanuq Pad North Reference: True Well: Plan: CD4-594 Survey Calculation Method: Minimum Curvature Wellbore: CD4-594PH1 Design: CD4-594PH1 wp13 Plan Survey Tool Program Date 8/26/2019 Depth From Depth To (usft) (usft) Survey (Wellbore) Tool Name Remarks 1 28 00 1,600.00 CD4-594PH1 wp13 (CD4-594PH GYD-GC-SS Gyrodata gyro single shots 2 1,600.00 2,900.00 CD4-594PH1 wp13 (CD4-594PH MWD OWSG I OWSG MWD - Standard 3 1,600.00 2,900.00 CD4-594PH1 wp13 (CD4-594PH MWD+IFR2+SAG+MS OWSG MWD + IFR2 + Sag + D 4 2,900.00 4,400.00 CD4-594PH1 wp13 (CD4-594PH MWD OWSG OWSG MWD - Standard 5 2,900.00 10,250.00 CD4-594PH1 wp13 (CD4-594PH MWD+IFR2+SAG+MS OWSG MWD + IFR2 + Sag + A 6 10,250.00 11,750.00 CD4-594PH1 wp13 (CD4-594PH MWD OWSG OWSG MWD - Standard 7 10,250.00 15,100.61 CD4-594PH1 wp13 (CD4-594PH MWD+IFR2+SAG+MS OWSG MWD + IFR2 + Sag + IN Plan Sections Measured Vertical Dogleg Build Turn Depth Inclination Azimuth Depth +NI-S +E/-W Rate Rate Rate TFO (usft) (1) (usft) (usft) (usft) (°/100usft) (°/100usft) (°1100usft) (1) Target 28.00 0.00 0.00 28.00 0.00 0.00 0.00 0.00 0.00 0.00 300.00 0.00 0.00 300.00 0.00 0.00 0.00 0.00 0.00 0.00 500.00 2.50 103.60 499.94 -1.03 4.24 1.25 1.25 0.00 103.60 700.00 6.50 103.60 699.28 4.71 19.49 2.00 2.00 0.00 0.00 1,151.65 18.92 103.60 1,139.00 -28.04 115.89 2.75 2.75 0.00 0.00 1,257.36 18.92 103.60 1,239.00 -36.10 149.20 0.00 0.00 0.00 0.00 2,910.87 68.53 103.60 2,397.00 -296.52 1,225.65 3.00 3.00 0.00 0.00 2,930.87 68.53 103.60 2,404.32 -300.89 1,243.74 0.00 0.00 0.00 0.00 3,420.87 79.21 114.12 2,540.61 -453.71 1,687.42 3.00 2.18 2.15 45.00 3,855.39 82.49 122.28 2,609.81 -656.37 2,065.03 2.00 0.75 1.88 68.59 10,256.74 82.49 122.28 3,447.00 -4,045.84 7,430.46 0.00 0.00 0.00 0.00 CD4-594PH1 Csg Tgl 10,306.74 82.49 122.28 3,453.54 -4,072.32 7,472.37 0.00 0.00 0.00 0.00 10,473.04 86.00 125.84 3,470.22 -4,164.97 7,609.40 3.00 2.11 2.14 45.40 12,508.37 86.00 125.84 3,612.19 -5,353.81 9,255.32 0.00 0.00 0.00 0.00 13,542.04 55.00 125.00 3,953.04 -5,912.23 10,039.31 3.00 -3.00 -0.08 -178.66 13,922.04 55.00 125.00 4,171.00 -6,090.77 10,294.29 0.00 0.00 0.00 0.00 CD4-594PH1 Tgt01 15,100.61 55.00 125.00 4,847.00 -6,644.52 11,085.12 0.00 0.00 0.00 0.00 8/26/2019 2:03:24PM Page 3 COMPASS 5000.14 Build 85H ConocoPhilli s p Database: EDT 14 Alaska Production Company: ConocoPhillips Alaska Inc_WNS Project: Western North Slope Site: CD4 Nanuq Pad Well: Plan: CD4-594 Wellbore: CD4-594PH1 Design: CD4-594PH1 wp13 Planned Survey Measured Vertical Depth Inclination Azimuth Depth (usft) (usft) 28.00 0.00 0.00 28.00 KOP: Start 1.25*1100' DLS, 103.6° TF, for 200' 100.00 0.00 0.00 100.00 200.00 0.00 0.00 200.00 300.00 0.00 0.00 300.00 Start 2°/100' DLS, 0° TF, for 200' 400.00 1.25 103.60 399.99 500.00 2.50 103.60 499.94 Start 2.75°/100' DLS, 0° TF, for 461.65' 600.00 4.50 103.60 599.74 700.00 6.50 103.60 699.28 Hold for 105.71' 800.00 9.25 103.60 798.33 900.00 12.00 103.60 896.60 1,000.00 14.75 103.60 993.88 1,100.00 17.50 103.60 1,089.94 1,151.65 18.92 103.60 1,139.00 Start 3°/100' DLS, 0° TF, for 1653.61' 1,200.00 18.92 103.60 1,184.74 1,254.19 18.92 103.60 1,236.00 Base Permafrost 1,257.36 18.92 103.60 1,239.00 Hold for 20' 1,300.00 20.20 103.60 1,279.18 1,400.00 23.20 103.60 1,372.08 1,500.00 26.20 103.60 1,462.92 1,600.00 29.20 103.60 1,551.45 1,700.00 32.20 103.60 1,637.43 1,800.00 35.20 103.60 1,720.61 1,900.00 38.20 103.60 1,800.78 2,000.00 41.20 103.60 1,877.71 2,100.00 44.20 103.60 1,951.20 2,200.00 47.20 103.60 2,021.03 2,300.00 50.20 103.60 2,087.02 2,400.00 53.20 103.60 2,149.00 2,480.77 55.62 103.60 2,196.00 C-40 2,500.00 56.20 103.60 2,206.78 2,600.00 59.20 103.60 2,260.21 2,700.00 62.20 103.60 2,309.14 2,800.00 65.20 103.60 2,353.44 2,900.00 68.20 103.60 2,392.99 2,910.87 68.53 103.60 2,397.00 Start 3°/100' DLS, 46' TF, for 490' - 13-3/8 x 16 2,930.87 68.53 103.60 2,404.32 Start 2*1100' DLS, 68.59' TF, for 434.52' 2,988.95 69.76 104.91 2,425.00 C-30 3,000.00 70,00 105.16 2,428.80 3,100.00 72.15 107.37 2,461.23 3,200.00 74.33 109.52 2,490.06 3,300.00 76.53 111.63 2,515.22 3,400.00 78.75 113.70 2,536.62 812612019 2:03:24PM Local Co-ordinate Reference: TVD Reference: MD Reference: North Reference: Survey Calculation Method: ConocoPhillips Standard Proposal Report Well Plan: CD4-594 19+27+1 @ 47.00usft (D141) 19+27+1 @ 47,00usft (D141) True Minimum Curvature Vertical Dogleg Build Turn +N/-S +El-W Section Rate Rate Rate (usft) (usft) (usft) (,/100usft) (°/100usft) (1/100usft) 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0,00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 -0.26 1.06 1.04 1.25 1.25 0.00 -1.03 4.24 4.16 1.25 1.25 0.00 -2.46 10.17 9.99 2,00 2.00 0.00 A.71 19.49 19.14 2.00 2.00 0.00 -7.94 32.80 32.22 2.75 2.75 0.00 -12.27 50.72 49.82 2.75 2.75 0.00 -17.71 73.21 71.90 2.75 2.75 0.00 -24.24 100.20 98.40 2.75 2.75 0.00 -28.04 115.89 113.81 2.75 2.75 0.00 -31.72 131.12 128.78 0.00 0.00 0.00 -35.85 148.20 145.55 0.00 0.00 0.00 -36.10 149.20 146.53 0.00 0.00 0.00 -39.45 163.08 160.16 3.00 3.00 0.00 -48.15 199.01 195.45 3.00 3.00 0.00 -57.97 239.62 235.33 3.00 3.00 0.00 -68.90 284.79 279.70 3.00 3.00 0.00 -80.90 334.41 328.42 3.00 3.00 0.00 -93.95 388.33 381.38 3.00 3.00 0.00 -108.00 446.41 438.42 3.00 3.00 0.00 -123.02 508.49 499.39 3.00 3.00 0.00 -138.96 574.40 564.11 3.00 3.00 0.00 -155.79 643.95 632.42 3.00 3.00 0.00 -173.45 716.96 704.13 3.00 3.00 0.00 -191.90 793.23 779.03 3.00 3.00 0.00 -207.35 857.07 841.73 3.00 3.00 0.00 -211.09 872.55 856.92 3.00 3.00 0.00 -230.96 954.69 937.60 3.00 3.00 0.00 -251.47 1,039.44 1,020.83 3.00 3.00 0.00 -272.55 1,126.57 1,106.40 3.00 3.00 0.00 -294.14 1,215.83 1,194.06 3.00 3.00 0.00 -296.52 1,225.65 1,203.70 3.00 3.00 0.00 -300.89 1,243.74 1,221.47 0.00 0.00 0.00 -314.26 1,296.34 1,273.46 3.00 2.13 2.26 -316.95 1,306.36 1.283.44 3.00 2.14 2.24 -343.45 1,397.15 1,374.94 3.00 2.16 2.21 -373.75 1,487.97 1,468.41 3.00 2.18 2.15 -407.77 1,578.57 1,563.61 3.00 2.20 2.11 -445.41 1,668.70 1,660.26 3.00 2.22 2.07 Page 4 COMPASS 5000.14 Build 85H ConocoPhillips ConocoPhillips Standard Proposal Report Database: EDT 14 Alaska Production Local Co-ordinate Reference: Well Plan: CD4-594 Company: ConocoPhillips Alaska Inc_WNS TVD Reference: 19+27+1 @ 47.00usft (D141) Project: Western North Slope MD Reference: 19+27+1 @ 47.00usft (D141) Site: CD4 Nanuq Pad North Reterence: True Well: Plan: CD4-594 Survey Calculation Method: Minimum Curvature Wellbore: CD4-594PH1 Design: CD4-594PH1 wp13 Planned Survey Measured Vertical Vertical Dogleg Build Turn Depth Inclination Azimuth Depth +N/-S +EI-W Section Rate Rate Rate (usft) (1) (1) (usft) (usft) (usft) (usft) (°HOOusft) (°/100usft) ('1100usft) 3,420.87 79.21 114.12 2,540.61 -453.71 1,687.42 1,680.59 3.00 223 2.05 Hold for 6401.35' 3,500.00 79.80 115.62 2,555.02 -486.44 1,758.01 1,757.96 2.00 0.73 1.89 3.600.00 80.54 117.51 2,572.10 -530.50 1,846.14 1,856.20 2.00 0.74 1.88 3,700.00 81.30 119.38 2,587.88 -577.53 1,932.96 1,954.85 2.00 0.75 1.88 3,800.00 82.06 121.25 2,602.36 -627.47 2,018.37 2,053.79 2.00 0.76 1.87 3,855.39 82.49 122.28 2,609.81 -656.37 2,065.03 2,108.67 2.00 0.77 1.86 Adjust TF to 0°, for 50' 3,900.00 82.49 122.28 2,615.64 -679.99 2,102.42 2,152.88 0.00 0.00 0.00 4,000.00 82.49 122.28 2,628.72 -732.94 2,186.24 2,251.99 0.00 0.00 0.00 4,100.00 82.49 122.28 2,641.80 -785.89 2,270.06 2,351.11 0.00 0.00 0.00 4,200.00 82.49 122.28 2,654.88 -838.84 2,353.87 2,450.22 0.00 0.00 0.00 4,300.00 82.49 122.28 2,667.96 -891.79 2,437.69 2,549.34 0.00 0.00 0.00 4,400.00 82.49 122.28 2,681.03 -944.74 2,521.51 2,648.45 0.00 0.00 0.00 4,500.00 82.49 122.28 2,694.11 -997.69 2,605.33 2,747.56 0.00 0.00 0.00 4,600.00 82.49 122.28 2,707.19 -1,050.63 2.689.14 2,846.68 0.00 0.00 0.00 4,700.00 82.49 122.28 2,720.27 -1,103.58 2,772.96 2,945.79 0.00 0.00 0.00 4,800.00 82.49 122.28 2,733.35 -1,156.53 2,856.78 3,044.91 0.00 0.00 0.00 4,900.00 82.49 122.28 2,746.43 -1,209.48 2,940.59 3,144.02 0.00 0.00 0.00 4,942.62 82.49 122.28 2,752.00 -1,232.05 2,976.32 3,186.26 0.00 0.00 0.00 C-20 5,000.00 82.49 122.28 2,759.50 -1,262.43 3,024.41 3,243.13 0.00 0.00 0.00 5,100.00 82.49 122.28 2,772.58 -1,315.38 3,108.23 3,342.25 0.00 0.00 0.00 5,200.00 82.49 122.28 2,785.66 -1,368.33 3,192.05 3,441.36 0.00 0.00 0.00 5,300.00 82.49 122.28 2,798.74 -1,421.28 3,275.86 3,540.47 0.00 0.00 0.00 5,400.00 82.49 122.28 2,811.82 -1,474.23 3,359.68 3,639.59 0.00 0.00 0.00 5,500.00 82.49 122.28 2,824.90 -1,527.18 3,443.50 3,738.70 0.00 0.00 0.00 5,600.00 82.49 122.28 2,837.97 -1,580.13 3,527.32 3,837.82 0.00 0.00 0.00 5,700.00 82.49 122.28 2,851.05 -1,633.08 3,611.13 3,936.93 0.00 0.00 0.00 5.800.00 82.49 122.28 2,864.13 -1,686.03 3,694.95 4,036.04 0.00 0.00 0.00 5,900.00 82.49 122.28 2,877.21 -1,738.98 3,778.77 4,135.16 0.00 0.00 0.00 6,000.00 82.49 122.28 2,890.29 -1,791.93 3,862.58 4,234.27 0.00 0.00 0.00 6,100.00 82.49 122.28 2,903.37 -1,844.88 3,946.40 4,333.39 0.00 0.00 0.00 6,200.00 82.49 122.28 2,916.44 -1,897.82 4,030.22 4,432.50 0.00 0.00 0.00 6,300.00 82.49 122.28 2,929.52 -1,950.77 4,114.04 4,531.61 0.00 0.00 0.00 6,400.00 82.49 122.28 2,942.60 -2,003.72 4,197.85 4,630.73 0.00 0.00 0.00 6,500.00 82.49 122.28 2,955.68 -2,056.67 4,281.67 4,729.84 0.00 0.00 0.00 6,600.00 82.49 122.28 2,968.76 -2,109.62 4,365.49 4,828.96 0.00 0.00 0.00 6,700.00 82.49 122.28 2,981.84 -2,162.57 4,449.30 4,928.07 0.00 0.00 0.00 6,739.48 82.49 122.28 2,987.00 -2,183.48 4,482.40 4,967.20 0.00 0.00 0.00 C-10 6,800.00 82.49 122.28 2,994.91 -2,215.52 4,533.12 5,027.18 0.00 0.00 0.00 6,900.00 82.49 122.28 3,007.99 -2,268.47 4,616.94 5,126.30 0.00 0.00 0.00 7,000.00 82.49 122.28 3,021.07 -2,321.42 4,700.76 5,225.41 0.00 0.00 0.00 7,100.00 82.49 122.28 3,034.15 -2,374.37 4,784.57 5,324.52 0.00 0.00 0.00 7,200.00 82.49 122.28 3,047.23 -2,427.32 4,868.39 5,423.64 0.00 0.00 0.00 7,300.00 82.49 122.28 3,060.31 -2,480.27 4,952.21 5,522.75 0.00 0.00 0.00 7,400.00 82.49 122.28 3,073.39 -2,533.22 5,036.02 5,621.87 0.00 0.00 0.00 7,500.00 82.49 122.28 3,086.46 -2,586.17 5,119.84 5,720.98 0.00 0.00 0.00 7,600.00 82.49 122.28 3,099.54 -2,639.12 5,203.66 5,820.09 0.00 0.00 0.00 7,700.00 82.49 122.28 3,112.62 -2,692.07 5,287.48 5,919.21 0.00 0.00 0.00 7,800.00 82.49 122.28 3,125.70 -2,745.01 5,371.29 6,018.32 0.00 0.00 0.00 �_ 7,900.00 82.49 122.28 3,138.78-2,797.96 5455.11 6117.44 0.00 0.00 0.00 8/26/2019 2:03:24PM Page 5 COMPASS 5000.14 Build 85H ConocoPhillips p Database: EDT 14 Alaska Production Company: ConocoPhillips Alaska Inc_WNS Project: Western North Slope Site: CD4 Nanuq Pad Well: Plan: CD4-594 Welibore: CD4-594PH1 Design: CD4-594PH1 wp13 Planned Survey Measured Vertical Depth Inclination Azimuth Depth (usft) (^) (^) (usft) 8,000.00 82.49 122.28 3,151.86 8,100.00 82.49 122.28 3,164.93 8,200.00 82.49 122.28 3,178.01 8,300.00 82.49 122.28 3,191.09 8,400.00 82.49 122.28 3,204.17 8,500.00 82.49 122.28 3,217.25 8,600.00 82.49 122.28 3,230.33 8,700.00 82.49 122.28 3,243.40 8,800.00 82.49 122.28 3,256.48 8,900.00 82.49 122.28 3,269.56 9,000.00 82.49 122.28 3,282.64 9,100.00 82.49 122.28 3,295.72 9,200.00 82.49 122.28 3,308.80 9,300.00 82.49 122.28 3,321.87 9,400.00 82.49 122.28 3,334.95 9,500.00 82.49 122.28 3,348.03 9,600.00 82.49 122.28 3,361.11 9,700.00 82.49 122.28 3,374.19 9,800.00 82.49 122.28 3,387.27 9,900.00 82.49 122.28 3,400.34 10,000.00 82.49 122.28 3,413.42 10,100.00 82.49 122.28 3,426.50 10,200.00 82.49 122.28 3,439.58 10,256.74 82.49 122.28 3,447.00 Start 3°/100' DLS, 45.4° TF, for 166.3' - 9- 518 x 12.1/4 10,300.00 82.49 122.28 3,452.66 10,306.74 82.49 122.28 3,453.54 Hold for 2035.33' 10,400.00 84.45 124.28 3,464.15 10,473.04 86.00 125.84 3,470.22 Start 3°/100' DLS,-178.66° TF, for 1033.67' 10,500.00 86.00 125.84 3,472.10 10,600.00 86.00 125.84 3,479.08 10,700.00 86.00 125.84 3,486.05 10,800.00 86.00 125.84 3,493.03 10,900.00 86.00 125.84 3,500.00 11,000.00 86.00 125.84 3,506.98 11,100.00 86.00 125.84 3,513.95 11,200.00 86.00 125.84 3,520,93 11,300.00 86.00 125.84 3,527.90 11,400.00 86.00 125.84 3,534.88 11,500.00 86.00 125.84 3,541.85 11,600.00 86.00 125.84 3,548.83 11,700.00 86.00 125.84 3,555.80 11,800.00 86.00 125.84 3,562.78 11,900.00 86.00 125.84 3,569.75 12,000.00 86.00 125.84 3,576.73 12,100.00 86.00 125.84 3,583.70 12,200.00 86.00 125.84 3,590.68 12,300.00 86.00 125.84 3,597.65 12,400.00 86.00 125.84 3,604.63 12,500.00 86.00 125.84 3,611.60 12,508.37 86.00 125.84 3,612.19 ConocoPhillips Standard Proposal Report Local Co-ordinate Reference: Well Plan: CD4-594 TVD Reference: 19+27+1 @ 47.00usft (D141) MD Reference: 19+27+1 @ 47.O0usft (D141) North Reference: True Survey Calculation Method: Minimum Curvature Vertical Dogleg Build Turn +N/-S +E/-W Section Rate Rate Rate (usft) (usft) (usft) (°/100usft) (°1100usft) (°/100usft) -2,850.91 5,538.93 6,216.55 0.00 0.00 0.00 -2,903.86 5,622.74 6,315.66 0.00 0.00 0.00 -2,956.81 5,706.56 6,414.78 0.00 0.00 0.00 -3,009.76 5,790.38 6,513.89 0.00 0.00 0.00 -3,062.71 5,874.20 6,613.00 0.00 0.00 0.00 -3,115.66 5,958.01 6,712.12 0.00 0.00 0.00 -3,168.61 6,041.83 6,811.23 0.00 0.00 0.00 -3,221.56 6,125.65 6,910.35 0.00 0.00 0.00 -3,274.51 6,209.46 7,009.46 0.00 0.00 0.00 -3,327.46 6,293.28 7,108.57 0.00 0.00 0.00 -3,380.41 6,377.10 7,207.69 0.00 0.00 0.00 -3,433.36 6,460.92 7,306.80 0.00 0.00 0.00 -3,486.31 6,544.73 7,405.92 0.00 0.00 0.00 -3,539.26 6,628.55 7,505.03 0.00 0.00 0.00 -3,592.20 6,712.37 7,604.14 0.00 0.00 0.00 -3,645.15 6,796.18 7,703.26 0.00 0.00 0.00 -3,698.10 6,880.00 7,802.37 0.00 0.00 0.00 -3,751.05 6,963.82 7,901.49 0.00 0.00 0.00 -3,804.00 7,047.64 8,000.60 0.00 0.00 0.00 -3,856.95 7,131.45 8,099.71 0.00 0.00 0.00 -3,909.90 7,215.27 8,198.83 0.00 0.00 0.00 -3,962.85 7,299.09 8,297.94 0.00 0.00 0.00 -4,015.80 7,382.91 8,397.05 0.00 0.00 0.00 -4,045,84 7,430.46 8,453.29 0.00 0.00 0.00 -4,068.75 7,466.72 8,496.17 0.00 0.00 0.00 -4,072.32 7,472.37 8,502.85 0.00 0.00 0.00 -4,123.16 7,549.82 8,595.42 3.00 2.11 2.15 -4,164.97 7,609.40 8,668.01 3.00 2.12 2.13 -4,180.72 7,631.20 8,694.81 0.00 0.00 0.00 -4,239.13 7,712.06 8,794.20 0.00 0.00 0.00 -4,297.54 7,792.93 8,893.59 0.00 0.00 0.00 -4,355.95 7,873.80 8,992.98 0.00 0.00 0.00 -4,414.36 7,954.67 9,092.37 0.00 0.00 0.00 -4,472.77 8,035.53 9,191.76 0.00 0.00 0.00 -4,531.18 8,116.40 9,291.16 0.00 0.00 0.00 -4,589.59 8,197.27 9,390.55 0.00 0.00 0.00 -4,648.00 8,278.14 9,489.94 0.00 0.00 0.00 -4,706.41 8,359.01 9,589.33 0.00 0.00 0.00 -4,764.82 8,439.87 9,688.72 0.00 0.00 0.00 -4,823.23 8,520.74 9,788.11 0.00 0.00 0.00 -4,881.64 8,601.61 9,887.51 0.00 0.00 0.00 -4,940.05 8,682.48 9,986.90 0.00 0.00 0.00 -4,998.46 8,763.34 10,086.29 0.00 0.00 0.00 -5,056.87 8,844.21 10,185.68 0.00 0.00 0.00 -5,115.28 8,925.08 10,285.07 0.00 0.00 0.00 -5,173.69 9,005.95 10,384.46 0.00 0.00 0.00 -5,232.10 9,086.81 10,483.86 0.00 0.00 0.00 -5,290.52 9,167.68 10,583.25 0.00 0.00 0.00 -5,348.93 9,248.55 10,682.64 0.00 0.00 0.00 -5,353.81 9,255.32 10,690.96 0.00 0.00 0.00 8/26/2019 2:03:24PM Page 6 COMPASS 5000.14 Build 85H ConocoPhillips ConocoPhillips Standard Proposal Report Database: EDT 14 Alaska Production Local Co-ordinate Reference: Well Plan: CD4-594 Company: ConocoPhillips Alaska Inc_WNS ND Reference: 19+27+1 @ 47.00usft (D1 41) Project: Western North Slope MD Reference: 19+27+1 @ 47.00usft (D141) Site: CD4 Nanuq Pad North Reference: True Well: Plan: CD4-594 Survey Calculation Method: Minimum Curvature Wellbore: CD4-594PH1 Design: CD4-594PH1 wp13 Planned Survey Measured Vertical Vertical Dogleg Build Tura Depth Inclination Azimuth Depth +Nl-S +E/-W Section Rate Rate Rate (usft) (°) (°) (usft) (usft) (usft) (usft) (°/100usft) (°/100usft) (°/100usft) Hold for 380' 12,600.00 83.25 125.78 3,620.77 -5,407.18 9,329.30 10,781.85 3.00 -3.00 -0.07 12,700.00 80.25 125.70 3,635.11 -5,464.98 9,409.61 10,880.46 3.00 -3.00 -0.07 12,800.00 77.25 125.63 3,654.61 -5,522.17 9,489.29 10,978.19 3.00 -3.00 -0.07 12,900.00 74.25 125.56 3,679.21 -5,578.58 9,568.09 11,074.78 3.00 -3.00 -0.07 13,000.00 71.26 125.48 3,708.86 -5,634.06 9,645.81 11,169.97 3.00 -3.00 -0.08 13,100.00 68.26 125.40 3,743.45 -5,688.46 9,722.24 11,263.50 3.00 -3.00 -0.08 13,200.00 65.26 125.32 3,782.91 -5,741.63 9,797.17 11,355.10 3.00 -3.00 -0.08 13,300.00 62.26 125.23 3,827.12 -5,793.42 9,870.38 11,444.52 3.00 -3.00 -0.09 13,335.63 61.19 125.20 3,844.00 -5,811.51 9,896.02 11,475.81 3.00 -3.00 -0.09 K-3 13,400.00 59.26 125.14 3,875.97 -5,843.70 9,941.69 11,531.53 3.00 -3.00 -0.09 13,500.00 56.26 125.04 3,929.31 -5,892.32 10,010.89 11,615.88 3.00 -3.00 -0.10 13,542.04 55.00 125.00 3,953.04 -5,912.23 10,039.31 11,650.49 3.00 -3.00 -0.10 Adjust TF to 0°, for 1178.57' 13,600.00 55.00 125.00 3,986.28 -5,939.46 10,078.20 11,697.85 0.00 0.00 0.00 13,700.00 55.00 125.00 4,043.64 -5,986.45 10,145.30 11,779.56 0.00 0.00 0.00 13,754.67 55.00 125.00 4,075.00 -6,012.14 10,181.98 11,824.23 0.00 0.00 0.00 Top Narwhal Central 13,800.00 55.00 125.00 4,101.00 -6,033.43 10.212.40 11,861.27 0.00 0.00 0.00 13,873.23 55.00 125.00 4,143.00 -6,067.84 10,261.53 11,921.10 0.00 0.00 0.00 Top Narwhal Lefty 13,900.00 55.00 125.00 4,158.36 -6,080.42 10,279.50 11,942.98 0.00 0.00 0.00 13,922.04 55.00 125.00 4,171.00 -6,090.77 10,294.29 11,960.99 0.00 0.00 0.00 TD: 15100.61' MD, 4847' TVD 14,000.00 55.00 125.00 4,215.71 -6,127.40 10,346.60 12,024.69 0.00 0.00 0.00 14,100.00 55.00 125.00 4,273.07 -6,174.39 10,413.70 12,106.40 0.00 0.00 0.00 14,200.00 55.00 125.00 4,330.43 -6,221.37 10,480.80 12,188.11 0.00 0.00 0.00 14,300.00 55.00 125.00 4,387.79 -6,268.36 10,547.90 12,269.82 0.00 0.00 0.00 14,400.00 55.00 125.00 4,445.15 -6,315.34 10,615.01 12,351.53 0.00 0.00 0.00 14,500.00 55,00 125.00 4,502.50 -6,362.32 10,682.11 12,433.24 0.00 0.00 0.00 14,530.51 55.00 125.00 4,520.00 -6,376.66 10,702.58 12,458.16 0.00 0.00 0.00 K-2 14.600.00 55.00 125.00 4,559.86 -6,409.31 10,749.21 12,514.95 0.00 0.00 0.00 14,700.00 55.00 125.00 4,617.22 -6,456.29 10,816.31 12,596.65 0.00 0.00 0.00 14,800.00 55.00 125.00 4,674.58 -6,503.28 10,883.41 12,678.36 0.00 0.00 0.00 14,900.00 55.00 125.00 4,731.93 -6,550.26 10,950.51 12,760.07 0.00 0.00 0.00 15,000.00 55.00 125.00 4,789.29 -6,597.25 11,017.61 12,841.78 0.00 0.00 0.00 15,100.00 55.00 125.00 4,846.65 -6,644.23 11,084.71 12,923.49 0.00 0.00 0.00 15,100.61 • 55.00 125.00 4,847.00 -6,644.52 11,085.12 12,923.99 0.00 0.00 0.00 TD at 15100.61 - 8 314 OH 8/26/2019 2:03:24PM Page 7 COMPASS 5000.14 Build 85H ConocoPhillips Database: EDT 14 Alaska Production Local Co-ordinate Reference: Company: ConocoPhillips Alaska Inc_WNS TVD Reference: Project: Western North Slope MD Reference: Site: CD4 Nanuq Pad North Reference: Well: Plan: CD4-594 Survey Calculation Method: ConocoPhillips Standard Proposal Report Well Plan: CD4-594 19+27+1 @ 47.00usft (D141) 19+27+1 @ 47.00usft (D141) True Minimum Curvature Wellbore: CD4-594PH1 Design: CD4-594PH1 wp13 Design Targets Target Name hit/misstarget Dip Angle Dip Dir. TVD +N/-S +EI-W Shape (°) (°) (usft) (usft) (usft) CD4-594PH1 Csg Tgt w 0.00 0.00 3,447.00 -4,045 84 7,430.46 - plan hits target center -Circle (radius 100.00) CD4-594PH1 Tgt QM 0.00 0.00 4.057.00 -5,910.69 10,112.33 plan misses target center by 67.08usft at 13649.94usft MD (4014.93 TVD,-5962.93 N, 10111.71 E) Circle (radius 1,320.00) CD4-594 PH Tgt Poly 0.00 0.00 4,057.00 -6,246.63 9,381.63 plan misses target center by 704.90usft at 13278.52usft MD (3817.23 TVD,-5782.42 N, 9854.81 E) Polygon Point 1 4,057.00 0.00 0.00 Point 2 4,057.00 1,217.21 674.38 Point 3 4,057.00 715.86 1,459.69 Point 4 4.057.00 -546.08 803.04 CD4-594PH1 Tgt01 0.00 0.00 4,171.00 -6,090.77 10,294.29 plan hits target center Circle (radius 100.00) Casing Points Formations Measured Vertical Casing Hole Depth Depth Diameter Diameter (usft) (usft) Name (in) (in) 2,910.87 2,397.00 13-3/8 x 16 13.375 16 000 10,256.74 3,447.00 9- 5/8 x 12-1 /4 9.625 12 250 15,100.61 4,847.00 8 3/4 OH 0 000 8 750 Measured Vertical Depth Depth Dip (usft) (usft) Name Lithology (I 1,254.19 1,236.00 Base Permafrost 0.00 2,480.77 2,196.00 C-40 0.00 2,988.95 2,425.00 C-30 0.00 4,942.62 2,752.00 C-20 0.00 6,739.48 2,987.00 C-10 0.00 13,335.63 3,844.00 K-3 0.00 13,754.67 4,075.00 Top Narwhal Central 0.00 13,873.23 4,143.00 Top Narwhal Lefty 0.00 14,530.51 4,520.00 K-2 0.00 Dip Direction (°) 8/26/2019 2:03:24PM Page 8 COMPASS 5000.14 Build 85H ConocoPhillips p ConocoPhillips Standard Proposal Report Database: EDT 14 Alaska Production Local Co-ordinate Reference: Well Plan: CD4-594 Company: ConocoPhillips Alaska Inc_WNS TVD Reference: 19+27+1 @ 47.00usft (D141) Project: Western North Slope MD Reference: 19+27+1 @ 47.00usft (D141) Site: CD4 Nanuq Pad North Reference: True Well: Plan: CD4-594 Survey Calculation Method: Minimum Curvature Wellbore: CD4-594PH1 Design: CD4-594PH1 wp13 Plan Annotations Measured Vertical Local Coordinates Depth Depth +N/-S +E/•W (usft) (usft) (usft) (usft) Comment 28.00 28.00 0.00 0.00 KOP: Start 1.25'/100' DLS, 103.6° TF, for 200' 300.00 300.00 0,00 0.00 Start 2°/100' DLS, 0° TF, for 200' 500.00 499.94 -1.03 4.24 Start 2.75*/100' DLS, 0° TF, for 451.65' 700.00 699.28 -4.71 19.49 Hold for 105.71' 1,151.65 1,139.00 -28.04 115.89 Start Y/100' DLS, 0° TF, for 1653.51' 1,257.36 1,239.00 -36.10 149.20 Hold for 20' 2,910.87 2,397.00 -296.52 1,225.65 Start 3'/100' DLS, 45' TF, for 490' 2,930.87 2,404.32 -300.89 1,243.74 Start 2'/100' DLS, 68.59' TF, for 434.52' 3,420.87 2,540.61 -453.71 1,687.42 Hold for 6401.35' 3,855.39 2,609.81 -656.37 2,065.03 Adjust TF to 0°, for 50' 10,256.74 3.447.00 -4,045.84 7,430.46 Start 3*/100' DLS, 45.4° TF, for 166.3' 10,306.74 3,453.54 -4,072.32 7,472.37 Hold for 2035.33' 10,473.04 3,470.22 -4,164.97 7,609.40 Start 3'/100' DLS,-178.66' TF, for 1033.67' 12,508.37 3,612.19 -5,353.81 9,255.32 Hold for 380' 13,542.04 3,953.04 -5,912.23 10,039.31 Adjust TF to 0°, for 1178.57' 13,922.04 4,171.00 -6,090.77 10,294.29 TD: 15100.61' MD, 4847' TVD 15,100.61 4,847.00 -6,644.52 11,085.12 TD at 15100.61 8/26/2019 2.03:24PM Page 9 COMPASS 5000.14 Build 85H ConocoPhillips Alaska Inc_WNS Western North Slope CD4 Nanuq Pad Plan: CD4-594 CD4-594PH1 50103xxxxx00 CD4-594PH1 wp13 ConocoPhillips Clearance Summary Anticollision Report 26 August, 2019 Tray. Cylinder North Proximity Scan on Current Survey Data (North Reference) Reference Design: CD4 Nanuq Pad - Plan: CD4-594 - CD4-594PH1 - CD4-594PH1 wp13 Datum Height: 19+27+1 @ 47.00usft (D141) Scan Range: 0.00 to 15,100.61 usft. Measured Depth. Scan Radius is Unlimited . Clearance Factor cutoff is Unlimited. Max Ellipse Separation is 1,000.00 usft Geodetic Scale Factor Applied Version: 5000.14 Build: 85H Scan Type: GLOBAL FI LTER APPLIED: All wellpaths within 200'+ 100/1000 of reference Scan Type: 25.00 ConocoPhillips ConocoPhiiiipS Anticollision Report for Plan: CD4-594 - CD4-594PH1 wp13 ConocoPhillips Alaska Inc_WNS Western North Slope Tray. Cylinder North Proximity Scan on Current Survey Data (North Reference) Reference Design: CD4 Nanuq Pad - Plan: CD4-594 - CD4-594PH1 - CD4.594PH1 wp13 Scan Range: 0.00 to 15,100.61 usft. Measured Depth. Scan Radius is Unlimited . Clearance Factor cutoff is Unlimited. Max Ellipse Separation is 1,000.00 usft Measured Minimum @Measured Ellipse @Measured Clearance Summary Based on Site Name Depth Distance Depth Separation Depth Factor Minimum Separation Warning Comparison Well Name - Wellbore Name - Design (usft) (usft) (usft) (usft) usft CD4 Nanuq Pad CD4-03 - CD4-03 - CD4-03 CD4-03 - CD4-03 - CD4-03 CD4-03 - CD4-03 - CD4-03 CD4-05 - CD4-05 - CD4-05 CD4-05 - CD4-05 - CD4-05 CD4-05 - CD4-05 - CD4-05 CD4-289 - CD4-289 - CD4-289 CD4-289 - CD4-289 - CD4-289 CD4-289 - CD4-289 - CD4-289 CD4-290 - CD4-290 - CD4-290 CD4-290 - CD4-290 - CD4-290 CD4-291 - CD4-291 - CD4-291 CD4-291 - CD4-291 - CD4-291 CD4-291 - CD4-291 PB1 - CD4-291 PB1 CD4-291 - CD4-291 PB1 - CD4-291 PB1 CD4-292 - CD4-292 - CD4-292 CD4-298 - CD4-298 - CD4-298 CD4-298 - CD4-298 - CD4-298 CD4-298 - CD4-298 - CD4-298 CD4-298 - CD4-298PB1 - CD4-298PB1 CD4-298 - CD4-298P61 - CD4-298PB1 CD4-298 - CD4-298PB1 - CD4-298PB1 CD4-301 - CD4-301 - CD4-301 CD4-301 - CD4-301 - CD4-301 CD4-301 - CD4-301 - CD4-301 CD4-301 - CD4-301 A - CD4-301 A CD4-301 - CD4-301 A - CD4-301 A CD4-301 - CD4-301 A - CD4-301 A 315.47 158.86 315.47 155.89 325.00 53.485 Centre Distance Pass - 363.99 158.98 363.99 155.66 375.00 47.893 Ellipse Separation Pass - 675.45 173.79 675.45 168.37 700.00 32.030 Clearance Factor Pass - 290.90 197.53 290.90 194.83 300.00 73.221 Centre Distance Pass - 315.32 197.54 315.32 194.66 325.00 68.704 Ellipse Separation Pass - 845.10 278.62 845.10 271.77 900.00 40.661 Clearance Factor Pass - 979.02 67.91 979.02 62.63 975.00 12.867 Centre Distance Pass - 1,003.86 67.97 1,003.86 62.53 1,000.00 12.497 Ellipse Separation Pass - 1,077.82 70.63 1,077.82 64.67 1,075.00 11.856 Clearance Factor Pass - 1,024.56 23.87 1,024.56 18.06 1,025.00 4.113 Centre Distance Pass - 1,049.34 24.02 1,049.34 18.04 1,050.00 4.015 Clearance Factor Pass- 845.24 33.39 845.24 28.54 850.00 6.881 Ellipse Separation Pass - 869.88 33.55 869.88 28.56 875.00 6.735 Clearance Factor Pass - 845.24 33.39 845.24 28.54 850.00 6.881 Ellipse Separation Pass - 869.88 33.55 869.88 28.56 875.00 6.735 Clearance Factor Pass - 792.85 14.50 792.85 9.86 800.00 3.124 Clearance Factor Pass - 1,456.05 58.75 1,456.05 48.95 1.500.00 5.995 Centre Distance Pass - 1,503.77 59.17 1,503.77 48.65 1,550.00 5.625 Ellipse Separation Pass- 2,892.95 313.68 2,892.95 241.89 2,950.00 4.369 Clearance Factor Pass- 1,456.05 58.75 1,456.05 48.95 1,500.00 5.996 Centre Distance Pass- 1,503.77 59.17 1,503.77 48.65 1,550.00 5.625 Ellipse Separation Pass- 2,892.95 313.68 2,892.95 241.89 2,950.00 4.369 Clearance Factor Pass - 776.94 106.04 776.94 101.09 800.00 21.428 Centre Distance Pass - 3,786.28 143.22 3,786.28 63.71 3,800.00 1.801 Clearance Factor Pass - 3,810.83 141.90 3,810.83 63.19 3,825.00 1.803 Ellipse Separation Pass - 776.94 106.04 776.94 101.09 800.00 21.428 Centre Distance Pass - 3,786.28 143.22 3,786.28 63.94 3.800.00 1.807 Clearance Factor Pass - 3,810.83 141.90 3,810.83 63.42 3,825.00 1.808 Ellipse Separation Pass - 26 August, 2019 - 14:09 Page 2 of 6 COMPASS ConocoPhillips Alaska Inc CanOCOPh i I I i ps _WNS Western North Slope Anticollision Report for Plan: C134-594 - CD4-594PH1 wp13 Tray. Cylinder North Proximity Scan on Current Survey Data (North Reference) Reference Design: CD4 Nanuq Pad - Plan: CD4-594 - CD4-594PH7 - CD4-594PH1 wp13 Scan Range: 0.00 to 15,100.61 usft. Measured Depth. Scan Radius is Unlimited . Clearance Factor cutoff is Unlimited. Max Ellipse Separation is 1,000.00 usft Measured Minimum @Measured Ellipse @Measured Clearance Summary Based on Site Name Depth Distance Depth Separation Depth Factor Minimum Separation Warning Comparison Well Name - Wellbore Name - Design (usft) (usft) (usft) (usft) usft CD4-301 - CD4-301 B - CD4-301 B 776.94 106.04 776.94 101.09 800.00 21.427 Centre Distance Pass - CD4-301 - CD4-301 B - CD4-301 B 3,786.28 143.22 3,786.28 63.93 3,800.00 1.806 Clearance Factor Pass - CD4-301 - CD4-301 B - CD4-301 B 3,810.83 141.90 3,810.83 63.40 3,825.00 1.808 Ellipse Separation Pass - CD4-302 - CD4-302 - CD4-302 2,109.86 69.44 2,109.86 54.99 2,200.00 4.805 Centre Distance Pass - CD4-302 - CD4-302 - CD4-302 2,158.09 70.54 2,158.09 54.12 2,250.00 4.295 Ellipse Separation Pass - CD4-302 - CD4-302 - CD4-302 2,350.97 86.45 2,350.97 63.04 2,450.00 3.693 Clearance Factor Pass - CD4-304 - CD4-304 - CD4-304 116.30 180.18 116.30 178.69 125.00 121.229 Centre Distance Pass - CD4-304 - CD4-304 - CD4-304 191.30 180.64 191.30 178.66 200.00 91.292 Ellipse Separation Pass - CD4-304 - CD4-304 - CD4-304 716.21 216.45 716.21 210.66 750.00 37.363 Clearance Factor Pass - CD4-304 - CD4-304PB1 - CD4-304PB1 116.30 180.18 116.30 178.69 125.00 121.229 Centre Distance Pass - CD4-304 - CD4-304PB1 - CD4-304PB1 191.30 180.64 191.30 178.66 200.00 91.292 Ellipse Separation Pass - CD4-304 - CD4-304PB1 - CD4-304PB1 716.21 216.45 716.21 210.66 750.00 37.363 Clearance Factor Pass - CD4-306 - CD4-306 - CD4-306 339.12 218.77 339.12 215.72 350.00 71.677 Centre Distance Pass - CD4-306 - CD4-306 - CD4-306 387.10 218.90 387.10 215.50 400.00 64.377 Ellipse Separation Pass - CD4-306 - CD4-306 - CD4-306 843.46 267.34 843.46 262.03 900.00 50.379 Clearance Factor Pass - CD4-595 - CD4-595 - CD4-595 522.56 18.79 522.56 15.44 525.00 5.596 Centre Distance Pass - CD4-595 - CD4-595 - CD4-595 547.44 18.82 547.44 15.33 550.00 5.387 Ellipse Separation Pass - CD4-595 - CD4-595 - CD4-595 647.04 20.43 647.04 16.37 650.00 5.037 Clearance Factor Pass - CD4-595 - CD4-595PH1 - CD4-595PH1 522.56 18.79 522.56 15.44 525.00 5.596 Centre Distance Pass - CD4-595 - CD4-595PH1 - CD4-595PH1 547.44 18.82 547.44 15.33 550.00 5.387 Ellipse Separation Pass - CD4-595 - CD4-595PH1 - CD4-595PH1 647.04 20.43 647.04 16.37 650.00 5.037 Clearance Factor Pass - CD4-93 - CD4-93 - CD4-93 492.01 18.33 492.01 15,37 500.00 6.196 Ellipse Separation Pass - CD4-93 - CD4-93 - CD4-93 541.95 19.19 541.95 15.99 550.00 5.984 Clearance Factor Pass - CD4-93 - CD4-93A - CD4-93A 491.48 18.32 491.48 15.37 500.00 6.200 Ellipse Separation Pass - CD4-93 - CD4-93A - CD4-93A 541.43 19.18 541.43 15.97 550.00 5.984 Clearance Factor Pass - CD4-96 - CD4-96 - CD4-96 116.45 39.60 116.45 38.11 125.00 26.639 Centre Distance Pass - CD4-96 - CD4-96 - CD4-96 191.45 39.74 191.45 37.96 200.00 22.276 Ellipse Separation Pass - CD4-96 - CD4-96 - CD4-96 514.37 47.80 514.37 44.42 525.00 14.159 Clearance Factor Pass - CD4-96 - CD4-96A - CD4-96A 116.30 39.60 116.30 38.11 125.00 26.648 Centre Distance Pass - CD4-96 - CD4-96A - CD4-96A 191.30 39.74 191.30 37.96 200.00 22.283 Ellipse Separation Pass - 26 August,, 2019 - 14:09 Page 3 of 6 COMPASS ConocoPhillips Anticollision Report for Plan: CD4-594 - CD4-594PH1 wp13 Tray. Cylinder North Proximity Scan on Current Survey Data (North Reference) Reference Design: CD4 Nanuq Pad - Plan: CD4-594 - CD4-594PH1 - CD4-594PH1 wp13 Scan Range: 0.00 to 15,100.61 usft. Measured Depth. Scan Radius is Unlimited . Clearance Factor cutoff is Unlimited. Max Ellipse Separation is 1,000.00 usft Measured Minimum @Measured Ellipse Site Name Depth Distance Depth Separation Comparison Well Name - Wellbore Name - Design (usft) (usft) (usft) (usft) CD4-96 - CD4-96A - CD4-96A 514.23 47.79 514.23 44.42 CD4-96 - CD4-96APB1 - CD4-96APB1 116.30 39.60 116.30 38.11 CD4-96 - CD4-96APB1 - CD4-96APB1 191.30 39.74 191.30 37.96 CD4-96 - CD4-96APB1 - CD4-96APB1 514.23 47.79 514.23 44.42 Plan: CD4-499 - CD4-499 - CD4-499 wp08 West 340.91 99.68 340.91 97.27 Plan: CD4-499 - CD4-499 - CD4-499 wp08 West 414.49 99.81 414.49 97.12 Plan: CD4-499 - CD4-499 - CD4-499 wp08 West 872.61 123.00 872.61 118.08 Survey tool program From To (usft) (usft) 28.00 1,600.00 CD4-594PH1 wp13 1,600.00 2,900.00 CD4-594PH1 wp13 1,600.00 2,900.00 CD4-594PH1 wp13 2,900.00 4,400.00 CD4-594PH1 wp13 2,900.00 10,250.00 CD4-594PH1 wp13 10,250.00 11,750.00 CD4-594PH1 wp13 10,250.00 15,100.61 CD4-594PH1 wp13 Ellipse error terms are correlated across survey tool tie -on points. Calculated ellipses incorporate surface errors. Separation is the actual distance between ellipsoids. Distance Between centres is the straight line distance between wellbore centres. Clearance Factor = Distance Between Profiles / (Distance Between Profiles - Ellipse Separation). All station coordinates were calculated using the Minimum Curvature method. Survey/Plan ConocoPhillips Alaska Inc_WNS Western North Slope @Measured Clearance Summary Based on Depth Factor Minimum Separation Warning usft 525.00 14.159 Clearance Factor Pass - 125.00 26.648 Centre Distance Pass - 200.00 22.283 Ellipse Separation Pass - 525.00 14.159 Clearance Factor Pass - 350.00 41.381 Centre Distance Pass - 425.00 37.148 Ellipse Separation Pass - 900.00 25.021 Clearance Factor Pass - Survey Tool GYD-GC-SS MWD OWSG MWD+I FR2+SAG+M S MWD OWSG MWD+I F R 2+SAG+M S MWD OWSG MWD+I F R2+SAG+M S 26 August, 2019 - 14:09 Page 4 of 6 COMPASS 'ti► -- ConocoPhillips Anticollision Report for Plan: CD4-594 - CD4-594PH1 wp13 Direction and Coordinates are relative to True North Reference. Vertical Depths are relative to 19+27+1 @ 47.00usft (D141). Northing and Easting are relative to Plan: CD4-594. Coordinate System is US State Plane 1983, Alaska Zone 4. Central Meridian is-150.00°, Grid Convergence at Surface is: -0.93 °. cn 1501 N U Ladder Plot - ------------------------------------------- ------------- AV i ----'-- - - '- ------------ ----------- - - -- --- ------'---- - ------------------------ '--- - - ---- --'------------------------------- '- I -- 0 2000 4nnn norm Rnnn 1nnnn Measured Depth (2000 usft/in) ConocoPhillips Alaska Inc_WNS Western North Slope LEGEND $ CD4-03, CD4-03, CD4-03 VO � CD4-05, CD4-05, CD4-05 VO $ CD4-289, CD4-289, CD4-289 VO $ CD4-290, CD4-290, CD4-290 VO $ CD4-291,CD4-291,CD4-291 VO $ CD4-291,CD4-291PB1,CD4-291PB1 VO $ CD4-292, CD4-292, CD4-292 VO $ CD4-298, CD4-298, CD4-298 VO $ CD4-298,CD4-298PB1,CD4-298PB1 VO $ CD4-301, CD4-301, CD4-301 VO $ CD4-301, CD4-301 A, CD4-301 A VO $ CD4-301, CD4-301 B, CD4-301 B VO -�- CD4-302, CD4-302, CD4-302 V3 $ CD4-304, CD4-304, CD4-304 V6 $ CD4-304,CD4-304PB1,CD4-304PB1 V16 -� CD4-306, CD4-306, CD4-306 V1 -r�- CD4-595, CD4-595, CD4-595 VO $ CD4-595, CD4-595PH1,CD4-595PH1 VO $ CD4-93, CD4-93, CD4-93 VO CD4-93, CD4-93A, CD4-93A VO -�- CD4-96, CD4-96, CD4-96 VO CD4-96, CD4-96A, CD4-96A VO $ CD4-96,CD4-96APB1,CD4-96APB1 VO $ Plan: CD4-499, CD4-499, CD4-499\Ap08VlIestVO 26 August, 2019 - 14:09 Page 5 of 6 COMPASS Measured Depth (2000 usft/in) ConocoPhillips Alaska Inc_WNS Western North Slope LEGEND $ CD4-03, CD4-03, CD4-03 VO � CD4-05, CD4-05, CD4-05 VO $ CD4-289, CD4-289, CD4-289 VO $ CD4-290, CD4-290, CD4-290 VO $ CD4-291,CD4-291,CD4-291 VO $ CD4-291,CD4-291PB1,CD4-291PB1 VO $ CD4-292, CD4-292, CD4-292 VO $ CD4-298, CD4-298, CD4-298 VO $ CD4-298,CD4-298PB1,CD4-298PB1 VO $ CD4-301, CD4-301, CD4-301 VO $ CD4-301, CD4-301 A, CD4-301 A VO $ CD4-301, CD4-301 B, CD4-301 B VO -�- CD4-302, CD4-302, CD4-302 V3 $ CD4-304, CD4-304, CD4-304 V6 $ CD4-304,CD4-304PB1,CD4-304PB1 V16 -� CD4-306, CD4-306, CD4-306 V1 -r�- CD4-595, CD4-595, CD4-595 VO $ CD4-595, CD4-595PH1,CD4-595PH1 VO $ CD4-93, CD4-93, CD4-93 VO CD4-93, CD4-93A, CD4-93A VO -�- CD4-96, CD4-96, CD4-96 VO CD4-96, CD4-96A, CD4-96A VO $ CD4-96,CD4-96APB1,CD4-96APB1 VO $ Plan: CD4-499, CD4-499, CD4-499\Ap08VlIestVO 26 August, 2019 - 14:09 Page 5 of 6 COMPASS ConocoPhillips Anticollision Report for Plan: CD4-594 - CD4-594PH1 wp13 Clearance Factor Plot: Measured Depth versus Separation(Clearance) Factor 0 0 (6 LL c 0 c6 a c 0 1000 2000 3000 4000 5000 6000 7000 8000 9000 10000 11000 12000 Measured Depth (2000 usftfin) ConocoPhillips Alaska Inc_WNS Western North Slope LEGEND $ CD4-03, CD4-03, CD4-03 VO �F CD4-05, CD4-05, CD4-05 VO $ CD4-289, CD4-289, CD4-289 VO $ CD4-290, CD4-290, CD4-290 VO $ CD4-291, C134-291, CD4-291 VO $ CD4-291, CD4-291 PB1, CD4-291P131VO - CD4-292, CD4-292, CD4-292 VO $ CD4-298, CD4-298, C134-298 VO $ CD4-298, CD4-298PB1,CD4-298PB1 VO $ CD4-30 1, CD4-30 1, CD4-301 VO $ CD4-301, CD4-301 A, CD4-301 A VO $ CD4-301, CD4-301 B, CD4-301 B VO �- CD4-302, C134-302, CD4-302 V3 CD4-304, CD4-304, CD4-304 V6 $ CD4-304, CD4-304PB 1, CD4-304PB1 V16 -�- CD4-306, CD4-306, CD4-306 V1 $ CD4-595, CD4-595, CD4-595 VO �- CD4-595, CD4-595PH1,CD4-595PH1 VO $ CD4-93, CD4-93, CD4-93 VO -)E- CD4-93, CD4-93A, CD4-93A VO CD4-96, CD4-96, CD4-96 VO CD4-96, CD4-96A, CD4-96A VO $ CD4-96,CD4-96APB1,CD4-96APB1 VO -} Plan: CD4-499, CD4-499, CD4-499 wp08 West VO $ CD4-594PH1 wp13 26 August, 2019 - 14.09 Page 6 of 6 COMPASS 14:11. August N 2019 CD4-594Pril wp13 Lddder View fA co m O 3 a m m 0 O c7 @ N � O N T m W O O O N N C? co 300 ........... . ...... ...... I. c o — I I Ili" i I ro ii I i 0 C/) 15 0 --- - - ---- - I ---- _ III o I j I i Equivalent Magnetic Distance 0 0 1500 3000 4500 6000 7500 9000 Measured Depth SURVEY PROGRAM CASING DETAILS pth From Depth To Survey/Plan Tool T D MD Nam 28.00 1600.00 CD4-594PH1 wp13 (CD4-594POYP-GC-SS 2397.00 2910.87 13-3/8 x 16 1600.00 2900.00 CD4-594PH1 wp13 (CD4-594PM74D OWSG 3447.00 10256.74 9- 5/8 x 12-1/4 1600.00 2900.00 CD4-594PH1 wp13 (CD4-594PMVYD+IFR2+SAG+MS 4847.0015100.61 8 3/4 OH 2900.00 4400.00 CD4-594PH1 wp13 (CD4-594PMVVD OWSG 2900.0010250.00 CD4-594PH1 wp13 (CD4-594PIkAWD+IFR2+SAG+MS 10250.0011750.00 CD4-594PH1 wp13 (CD4-594PMVID OWSG 10250.0015100.61 CD4-594PH1 wp13 (CD4-594PMVYD+IFR2+SAG+MS m = a M a co 0 OM N it H �T N �t M 1t I 60 � — - - c 0 I I I I o_ a� 2 3 0 ......... .... ........ . I U i 0 Equivalent Magnetic Distance ' I 0 I 0 550 1100 1650 2200 2750 Partial Measured Depth 14:18, August 26 2019 CD4-594PH1 wp13 28.00 To 15100.61 Spider AL Weils UNL (NOT a S ' -3 1 B CD4- 5 0 C� 04PB1 ono 0 0 0 w� o 0 �o -30 0 00 4L 6 v CD4-3 1 o O 0 30 o 0 Y � CD4-2 8 40 C - 9 ° 5 CD4 R4 a 4 289 D -292 a �j4-9 6 CD4 4P w 13 CD4-9 CD4-9 A CD4-4 9 wp08 Vest CD4-59 PH1 CD4-96 PB1 CD4 3 Easting (3500 usft/in) 14:19, August 26 W18 CD4-594PH1 wp13 28.00 To 15100.61 Spider _ � B 1 �58N o N LO N to LO CO u7 V � O V7 Rr V O O U t 7PB V u) 4n,v'6 p 4) Lo unCD c 5 60 6 c a 0 O � r 5 r O Z v, O M P 0 5 Easting (700 usft/in) CD4-594PH1 wp13 14 az, Auguu M Wig CD4-594PH1 wp13 26.00 To 15100.61 Spider AG ONLY wells ., N S 'Ph C._ ,$ 8 y c C�t30 -10 6 0 CCL o 0 k(b 4 1 z N 0 6 N 02 110 3 � a CD 94PH1 wp13 CD4-29 2 32 16 2a Easting (60 usft/in) CD4-594Fril wp13 TIC View SURVEY PROGRAM SECTION DETAILS From To Tool MD Inc Azi TVD Dleg TFace Target Annotation 28.00 1600.00 GYD-GC-SS 28.00 0.00 0.00 28.00 0.00 0.00 KOP: Start 1.251/100' DLS, 103.6°TF, for 200' 1600.00 2900.00 MWD OWSG 300.00 0.00 0.00 300.00 0.00 0.00 Start 2%100' DLS, 0°TF, for 200' 1600.00 2900.00 MWD+IFR2+SAG+MS 500.00 2.50 103.60 499.94 1.25 103.60 Start 2.751/100' DLS, 0°TF, for 451.65' 2900.00 4400.00 MWD OWSG 700.00 6.50 103.60 699.28 2.00 0.00 Hold for 105.71' 2900.0010250.00 MWD+IFR2+SAG+MS 1151.65 18.92 103.60 1139.00 2.75 0.00 Start 3%100' DLS, 01TF, for 1653.51' 10250.0011750.00 MWD OWSG 1257.36 18.92 103.60 1239.00 0.00 0.00 Hold for 20' 10250.0015100.61 MWD+IFR2+SAG+MS 2910.87 68.53 103.60 2397.00 3.00 0.00 Start 3%100' DLS, 451TF, for 490' 2930.87 68.53 103.60 2404.32 0.00 0.00 Start 21/100' DLS, 68.59°TF, for 434.52' 3420.87 79.21 114.12 2540.61 3.00 45.00 Hold for 6401.35' 3855.39 82.49 122.28 2609.81 2.00 68.59 Adjust TF to 01, for 50' 10256.74 82.49 122.28 3447.00 0.00 0.00 CD4-594PH1 Csg Tgt wp11 Start 30/100' DLS, 45.40TF, for 166.3 10306.74 82.49 122.28 3453.54 0.00 0.00 Hold for 2035.33' 10473.04 86.00 125.84 3470.22 3.00 45.40 Start 31/100' DLS,-178.66°TF, for 1033.67' 12508.37 86.00 125.84 3612.19 0.00 0.00 Hold for 380' 13542.04 55.00 125.00 3953.04 3.00 -178.66 Adjust TF to 0°, for 1178.57' 13922.04 55.00 125.00 4171.00 0.00 0.00 CD4-594PH1 Tgt 01 TD: 15100.61' MD, 4847TVD 15100.61 55.00 125.00 4847.00 0.00 0.00 TD at 15100.61 TVD MD Name 2397.00 2910.87 13-3/8 x 16 3447.00 10256.74 9- 5/8 x 12-1/4 4847.00 15100.61 8 3/4 OH D4-30 -t57,r 330 D4-291 D4-301 27 \ 70, 1063R� 300! 75 -289 0 D4-29 180 �30 48 150 \ ��"�2237 390 2{37 i 7 1296 _ 39- iuL\ 1004\ Own 1 •I 1 � ad':..9 • • . �� a • �► 1 :1 28 300 300 490 490 670 60 670 860 860 -.-- 1040 1040 - --- 1230 1230 1410 1410 1600 1600 2160 2160 2730 90 2730 3290 3290 3850 3850 - 4410 4410 4970 4970 __v 5540 5540 6100 6100 7230 120 7230 8350 8350 9480 9480 1060C 10600 - -- 1173C 11730 1285C 12850 1398C 13980 -- 15101 14:35, August 2H M18 CD4-594PH1 wp13 28.00 To 1000.00 AC Flipbook SURVEY PROGRAM28 300 Depth From Depth To Tool 28.00 1600.00 GYD-GC-SS 0 300 490 1600.00 2900.00 MWD OWSG 1600.00 2900.00 MWD+IFR2+SAG+M 90 490 670 2900.00 4400.00 MWD OWSG 2900.0010250.00 MWD+IFR2+SAG+M D - 93 30 670 860 10250.0011750.00 MWD OWSG 10250.0015100.61 MWD+IFR2+SAG+M 860 1040 CASING DETAILS 3 60 1040 12 TVD MD Name 1230 1410 2397.00 2910.87 13-3/8 x 16 300 PB 60 3447.00 10256.74 9- 5/8 x 12-1/4 141 0 1600 4847.00 15100.61 8 3/4 OH I4 3 6 Oo 1600 2160 1�4- 9 598 MD Azi TFace 90 91 6 -3931 2160 2730 28.00 0.00 0.00 300.00 0.00 0.00 D4-9 APB �, �I 6�4y1 2730 3290 500.00 103.60 103.60 1 a3 I 700.00 103.60 0.00 5_ ".`,`. 3 % 9 3290 3850 1151.65 103.60 0.00 270 90 1257.36 103.60 0.00 $90 -_ 0 3850 4410 2910.87 103.60 0.00 B "� 9 2930.87 103.60 0.00 39111 W 4410 4970 "Ly 9",9 3855.3122.28 68.59 z 4970 -- ---- - 5540 10256.74 122.28 0.00 9730 10306.74 122.28 0.00 6 5540 - 61, 10473.04 125.84 45.40 12508.37 125.84 0.00 4- 9 PH 6100 7230 13542.04 125.00-178.66 240 120 13922.04 125.00 0.00 7230 8350 15100.61 125.00 0.00 60 8350 9480 9480 10600 210 150 10600 - 11730 90 11730 12850 180 12850 13980 13980 15101 14:34. August M 2019 CD4-594PH1 wp13 900.00 To 3000.00 AC Flipbook SURVEY PROGRAM 28 300 Depth From Depth To Tool 1600.00 2900.00 MWD OWSG D -28 300 --�� 490 1600.00 2900.00 MWD+IFR2+SAG+M 2900.00 4400.00 MWD OWSG 1 9 D 8PB 490 670 2900.0010250.00 MWD+IFR2+SAG+M 330 i 30 10250.0011750.00 MWD OWSG D4-30 670 860 10250.0015100.61 MWD+IFR2+SAG+M 17 _ 02 860 1040 D4-291 , v 233 1 CASING DETAILS `�i l 60 1'004 1040 12 TVD MD Name % 1230 1410 2397.00 2910.87 13-3/8 x 16 300 60 3447.00 10256.74 9- 5/8 x 12-1/4 / 4 141 0 1600 D4-29 i)� 2 1 �' g 2 - - 4847.00 15100.61 8 3/4 OH 14 0 456 ' itj I� ) g 6 30 1600 2160 MD Azi TFace 2160 2730 28.00 0.00 0.00 300.00 0.00 0.00 5 2730 3290 500.00 103.60 103.60 700.00 103.60 0.00 6 3290 3850 1151.65 103.60 0.00 270 4, 9 0 90 _ 1257.36 103.60 0.00 % 69 3850 4410 2910.87 103.60 0.00 2930.87 103.60 0.00 1,000 4410 4970 3420.87 114.12 45.00 4970 ��� 5540 3855.39 122.28 68.59 D4- 1/ 10256.74 122.28 0.00 1 99 10306.74 122.28 0.00 17 5540 - 61 10473.04 125.84 45.40 I 12508.37 125.84 0.00 168 97 6100 7230 13542.04 125.00-178.66 240 1590 6 120 _ 13922.04 125.00 0.00 1 921 7230 8350 15100.61 125.00 0.00 ` 1(�94 60 8350 9480 1 93 9480 10600 210 150 10600 11730 D4- 95 H 90 11730 12850 180 12850 13980 13980 15101 14748. August 26 2019 CD4-594PH1 wp13 2900.00 To 10400.00 AC Flipbook SURVEY PROGRAM 28 300 Depth From Depth To Tool 28.00 1600.00 GYD-GC-SS 0 300 490 1600.00 2900.00 MWD OWSG 1600.00 2900.00 MWD+IFR2+SAG+M 180 490 670 2900.00 4400.00 MWD OWSG 2900.0010250.00 MWD+IFR2+SAG+MS 330 30 670 860 10250.0011750.00 MWD OWSG 10250.0015100.61 MWD+IFR2+SAG+M 860 1040 CASING DETAILS 12 1040 12 TVD MD Name 1230 1410 2397.00 2910.87 13-3/8 x 16 300 60 3447.00 10256.74 9- 5/8 x 12-1/4 1410 1 600 4847.0015100.61 8 3/4 OH D 3 1600 2160 60 MD Azi TFace 4 66 2160 2730 28.00 0.00 0.00 300.00 0.00 0.00 2730 3290 500.00 103.60 103.60 71 700.00 103.60 0.00 _. 3290 3850 1151.65 103.60 0.00 270 ' 90 1257.36 103.60 0.00 - - 77 3850 - - -.__--- _ 4410 2910.87 103.60 0.00 2930.87 103.60 0.00 4410 4970 3420.87 114.12 45.00 3855,39 122.28 68.59 3 3 4970 5540 10256.74 122.28 0.00 60 10306.74 122.28 0.00� 554.0 61 10473.04 125.84 45.40 12508.37 125.84 0.00 6100 7230 13542.04 125.00-178.66 240 120 13922.04 125.00 0.00 7 7230 8350 15100.61 125.00 0.00 12 8350 - 9480 6 9480 10600 4 3 10600 11730 210 3 78 150 18 11730 12850 180 12850 13980 13980 15101 14:52, August 26 2018 CD4-594PH1 wp13 10300.00 To 15100.61 AC Flipbook SURVEY PROGRAM 28 300 Depth From Depth To Tool 28.00 1600.00 GYD-GC-SS 0 300 -- 490 1600.00 2900.00 MWD OWSG 1600.00 2900.00 MWD+IFR2+SAG+M 180 490 670 2900.00 4400.00 MWD OWSG 2900.0010250.00 MWD+IFR2+SAG+M 330 30 670 860 10250.0011750.00 MWD OWSG 10250.0015100.61 MWD+IFR2+SAG+M 860 1040 CASING DETAILS 12 1040 12 TVD MD Name 1230 1410 2397.00 2910.87 13-3/8 x 16 300 60 3447.00 10256.74 9- 5/8 x 12-1/4 1410 1 600 4847.00 15100.61 8 3/4 OH 1600 2160 60 MD Azi TFace 2160 2730 28.00 0.00 0.00 300.00 0.00 0.00 2730 3290 500.00 103.60 103.60 700.00 103.60 0.00 3290 3850 1151.65 103.60 0.00 270 90 1257.36 103.60 0.00 3850 - - 4410 2910.87 103.60 0.00 2930.87 103.60 0.00 4410 4970 3420.87 114.12 45.00 3855.39 122.28 68.59 4970 5540 10256.74 122.28 0.00 60 10306.74 122.28 0.00 5540 - 61 10473.04 125.84 45.40 12508.37 125.84 0.00 6100 7230 13542.04 125.00-178.66 240 120 13922.04 125.00 0.00 7230 8350 15100.61 125.00 0.00 12 8350 - _ - 9480 9480 10600 10600 11730 210 150 180 11730 12850 180 12850 13980 13980 15101 16,13, August 26 W19 CD4-594PH1 wp13 10300.00 To 15100.61 Spider .CD4- 08 LO c, -� -301 A 3 � t LO o cn o cn o E 2 o O "CD4-3 2 1616. 0 o 0 N -21 � S 3 _c r S o C - 0 0 35 Z s 0 3 4 41 C 298PB 1 C 50G D4-298 $' S 4 C 291PB1 5 5 CD4-594PH1 Tgt 60 O tu SO 6 50 4 32 D4-290 P� CD4-5 4PH1 43 6p C 4-291 C 89 \N'9 5 O 5 )66 �\l C -292 5 4- BAL 21 C 4 209 CD -208 B� Easting (2000 usft/in) CD4-594PH1 wp13 Surface Location M CPA[ Coordinate Converter - From: — -- Datum: NAD83 - Region: alaska l` LatitudelLongitude Decimal Degrees UTM Zone: r— F South State Plane Zone: 14 Units us-ft t" Legal Description (NAD27 only) Starting Coordinates: X: 11518324.84 Y: 5957300-65 CD4-594PH1wp13 C3 CPAI Coordinate Converter ❑ x To: — — — — Datum: AD27 Region: alaska r LatitudelLongitude IDecimalDegrees r UTM Zone: True South t: Skate Plane Zane: 1 4 Units: us-ft r Legal Description (NAD27 only) Ending Coordinates: — X: 379291.330435862 Y: 5957553.4871895 Transform Quit Help Surface Location From:_ -- Datum: NAD83 Region: alaska Latitude/Longitude Decimal Degrees UTM Zonej r South 4o Stake Plane Zone 4 Units: us ft �" Le��ai De�x�pti��n (I•fr�.U27 ,rr�p11 — ❑ x To: Datum: NAD2� Region: alaska C` Latitude/Longitude IDecimalDegrees��� !" UTM Zone: True r South i State Plane Zone: 4 Units: us-itT r- Legal Description (NAD27 only) F Starting Coordinates: -- F- Legal Description ----- — 7{ 1518324.84 Township: 011 N Range: 005 E Y: 15957300.65 Meridian: rU------,l Section j19 FNL 2853.285J IFEL 14915.6106 Transform Quit Help CD4-594PH1wp13 Surface Casing M CPAI Coordinate Converter From: -- __ _ __— Datum: NAD83 Region: alaska i` Latitude/Longitude Decimal Degrees t UTM Zone: ��"" South C State Plane Zone: 4 Units: us ft C Legal Description (NAD27 only) ❑ X Datum: NAD27 Region: alaska + f Latitude/Longitude Decimal Degrees f UTM Zone: True I— South !� State Plane Zone 4 Units: us ft r Legal Description (NAD27 only) Starting Coordinates: - - - - - Ending Coordinates: - --- --- — — I X: 1519545 r X: 1379511.478499106 Y: 15956984 Y: 5957236.78308197 i Transform Quit Help CD4-594PH1wp13 Surface Casing M CPAI Coordinate Converter r Datum: Ngpg3 Region: alaska + C Latitude/Longitude Decimal Degrees ti UTM Zone: j" South r State Plane Zone: 4 Units: us ft + ir' Legal Descr2ptior� itJ,�,D'�i oT2iyl r Starting Coordinates: --- X: 11519545 Y: 5956984 ❑ X To: - - - - - ---- - Datum: Ngp27 Region: alaska t Latitude/Longitude Decimal Degrees f UTM Zone: True r South C State Plane Zone: 4 + Units: us ft �+ Legal Description (NAD27 only) Legal Description — — Township: 011 N + Range: 005 E + Meridian: ju + Section:l9 FNL 3150.3198 1FEL 3691.6395 Transform Quit Help CD4-594PH1wp13 Intermediate Casing I M CPAI Coordinate Converter Datum: NAD83 • Region: alaska - > Latitude/Longitude IDecimal Degrees r UTM Zone: — r South f� State Plane Zone: q Units: us-ft • f" Legal Description (NAD27 only) Starting Coordinates: X 11525687 Y: 15953135 ❑ X To: Datum: NAD27 • Region: alaska - f" Latitude/Longitude Decimal Degrees —� r UTM Zone: True I- South f: State Plane Zone: q Units: us ft • r Legal Description (NAD27 only) Ending Coordinates: X: 385653.330096472— Y: 5953387.48824901 Transform i Quit Help CD4-594PH1wp13 Intermediate Casing I E3 CPAI Coordinate Converter From: ---- - — Datum: NAD83 Region: alaska • {" Latitude/Longitude IDecimalDegrees r UTM Zone: I _ I- South f: State Plane Zone: q Units: us-ft • f Legai Gescnptiarr (t•1r�.G"?r'' orrl�,:l Starting Coordinates: - -- --- X: 11525687 i Y: 5953135 — ❑ x T o: _. __ _ Datum: NAD27 Region: alaska • f' Latitude/Longitude IDecimalDegrees > UTM Zone: True r' South State Plane Zone: q Units: I us-ft • Legal Description (NAD27 only) -Legal Description Township: o11 N • Range: 005 E - Meridian: U Section: 1 Z9 FNL I 1623.5735 FEL 2783.3975 'r Transform Quit Help CD4-594PH1wp13 Top of Production M CPAI Coordinate Converter From: -- --- Datum: NAD83 Region: alaska i Latitude/Longitude Decimal Degrees C UTM Zone: (" South State Plane Zone: q Units: us ft T i' Legal Description (NAD27 only) Starting Coordinates: 1528485 Y: 15951067 - To: ❑ X Datum: NAD27 Region: alaska f Latitude/Longitude Decimal Degrees r UTM Zone: True r South State Plane Zone: q Units: us ft r Legal Description (NAD27 only) Ending Coordinates: x: 388451.252583358 Y: 5951319.35070845 Transform Quit Help CD4-594PH1wp13 Top of Production M CPAI Coordinate Converter - ❑ X From ---.._.__._ __ �� To: - ._.- _._ _ _ �— --- — - Datum: NAD83 Region: alaska l Latitude/Longitude Decimal Degrees I UTM Zone: � r' South t: State Plane Zone: q Units: us ft r Legal Description irIAD'1 on1�y1 Starting Coordinates: X: 11528485 Y: 15951067 I Datum: NAD27 - 1 Region: alaska Latitude/Longitude IDecimalDegrees f UTM Zone: True South f State Plane Zone: q Units: us-ft t± Legal Description (NAD27 only) Legal Description- - - - - - Township 011 N Range: 005 E Meridian: Section: 2S FNL � 15649.6558 IFEL 5240.5512 i Transform Quit Help CD4-594PH1wp13 TD M CPAI Coordinate Converter From: I Datum: INAD83 Y-1 Region: lalaska r Latitude/Longitude Decimal Degrees f- UTM Zone: j South C' Stake Plane Zone: q Units: us fk r Legal Description (NAD27 only) Starting Coordinates: - -- Y 1529299.67 Y 5950477.53 CD4-594PH1 wp13 TD M CPAI Coordinate Converter From: Datum: NAD83 _ Region: alaska r Latitude/Longitude Decimal Degrees r UTM Zone: W r- South State Plane Zone: q Units: us-ft r Legal Description (NAD27 only) Starting Coordinates: -- -- X: 1529299.67 Y: 15950477.53 ❑ X -To: - - - -- Datum: NAD27 _ Region: alaska f Latitude/Longitude Decimal Degrees t' UTM Zone: True South t- State Plane Zone: q _ Units: us Ft i Legal Description (NAD27 only) Ending Coordinates: - - - X: 389265.900868361 Y: 5950729.84077318 Transform Quit Help - ❑ x Datum: NAD27 _ Region: alaska t Latitude/Longitude Decimal Degrees !' UTM Zone: True South (" State Plane Zone: q , Units: us-ft f� Legal Description (NAD27 only) Legal Description --- Township: 011 N , Range: 005 E Meridian: Section: 28 FNL - 4227.1141 FEL �-1 14418.8032 i Transform 1 Quit Help 19 13/31/14 1 AG I DB I C.A, I UPDATED PER K140003ACS 11014/28/14 I AS I DB I C.A.IUPDATED PER K140003ACSI CONDUCTORS CD4-X97 THRU CD4---X28 ARE LOCATED IN PROTRACTED SEC, 24, T 11 N. R 4 E, U.M. CONDUCTOR CD4-X96 IS LOCATED IN PROTRACTED SEC. 19, T 11 N, R 5 E, U.M. SEC.LINE O/S EXIST. WELL 'Y' 'X' LA1.(N) LONG.(W) FSL FEL GND PAD CD4-X86 5,957,337.85 1,518,480.27 70' 17 32,458 150' 59 14.133 2466 4760 12.4 18.9 CD4-287 5,957,333.22 1,518,460.78 70' 17 32.409 150' 59 14.699 2461 4780 12.4 19.1 C04-XBB 5 957 328.53 1 515.441.29 70' 17 32.360 150' 59 15, 2456 4799 12.4 18.9 C04-1 957 23.89 1 1 421. - 0' 1 11 ISO- ST 15.932 2451 4 19 12. 1 .0 C04-190 5,957,319.25 1 518 402.44 70' 17 32.262 150' 59 16.393 2446 4838 12.4 19.0 CD4-191 1 5,957 314.54 1,518,382.87 70' 17 32.213" 150' 59' 16,961" 2441' 4857 12.4 18.9 CD4-292 15.957 310.03 1,518,363.49 70' 17 32.155 150' 59 17.524 2436 4877 12.4 18.8 +-X93 15.957,305.151 518 344.09 70' 17 3 14 ' 59 18.087 2431 4896 12.4 19.o C04-X94 5 957 300.65 1 SIB 324.84 0' 17 32.067 150' 59 18.645 2426 4915 • 12.4 19.0 D4-X95,957,295,77 1 518 305.33 70' 17 32.016 150 5 1 .2 2 242 4935 12.4 1 19.0 C04-X96 5.957 291.25 1.518.286.46 70' 17' 31.968 150' 59 19.760" 2416 4953 12.4 1 18.9 C04-X97 5,95 286.78 1 518 266.76 70' 1 1.92i 150' 59 20.331 2412 1 Z 12.4 18.8 C04--X98 5,957,282.22 1.518.247.43 70' 17 31.873 150' 59 20.893 2407 31 12.4 19.1 CD4-X99 5,957 277.98 1 518 227.75 70' 17 31.828 150' 59' 21.464 2402 51 12.4 19.0 CD4-301B 5,957 273.28 1 518 208.24 70' 17 31.779 150' 59 22,030 2397 70 12.4 19.0 C04-302 5,957,265.36 1.518.188.64 70' 17 31.728 150' 59 22.599 -2392 90 12.4 19.6 CD4-303 5,957,263.99 1.518,169,26 70' 17 31.681 150' 59 23.162 2387 109 12.4 19.6 CD - 04 9 2 9.29'- _7751 8149. 0' 1 1.6 2 150' 9 2 .72 2 82 128 12.4 1 19. C04-05 5,957 254.43 1,518,130.28 70' 17 31.581 150' 59 24.293 2377 148 12.4 19.5 C04- 06 5 957 249.76 1,518,110.87 70' 17 31.532 150. 59 4.857 2372 167 12.4 19.6 C04-07 5,957,245.29 1.518.091.49 70' 17 31.485 150' 59 25.419 367 18 1124 19.7 CD4-208 5,957,240.13 1,518 071.80 70' 17 31.431 150' 59 25.991 2362 206 12.4 19.8 CD4-209 5,957,235.77 1 518 052.15 70' 17 31.385" 150' 59 26.561 2357 226 12.4 19.7 C04-210 5 957 230.92 11519.032.98 70' 17 31.334 150' 59 2 71-187 2352 245 12.4 19.6 CD4-211 5,957 226.94 1,518,013.75 70' 17 31.292 t50' 59 27.675 2348' 264 12.4 20.0 CD4-212 5,957 222.25 1 517 994.40 70' 1 3 _ 43 150' 59 28.238 2343 283 12.4 19.6 CD4-213 5,957 217.19 1 517,974.60 70' 17' 31.190" 150' 59' 28.812" 2337' 303 12.4 19.9 CD4-214 5.957 212.46 1 517,955.51 70' 17 31.140 150' 59 29.367 2332 322 12.4 19.8 CD4-215 5,957 208.07 1 517.935.87 70' 17 31.094 150' 59 29.937 2327 341 12.4 19.8 CD4-16 5,957,203.17 1,517.916,63 70' 17 31.043 150' 59 30.495" 2322 361 12.4 19.5 CD4-17 957 198.80 1 517 897, 4 70' 17 35. 9 150 59 3 .06 2318 80 12.4 19. CD4-31BA 5957 193.71 i 517 877.38 70' 17 30.944 150' 59 31.634 2312 400 12.4 19.6 C04-319 5,9571B9.64 1,517,857.90 70' 17 30.900 150' 59 32,200 2308 419 12.4 19.7 CD -32 1 .0 151 8 D' 1 0.8 2 1 0' 9 .7 9 30 4 12.4 19.7 CD4-321 5.957,180.22 1 517,819.26 70' 17 30,802 150' 59 33.322 2298 458 12.4 19.0 CD4-322 5 957 175.24 1 517 799. 0 70' 17 30.749 150' S9 33.884 2292 477 1-2 4 19.0 CD4-X23 5 957 170.76 1 517 780.38 70' 17 30.702 150' 9 34,450 2288 496 12.4 19.0 CD4-X24 5,957 166.23 1 517,760.82 70' 17 30.fi55 150' 59 35.018 2283 7516 12.4 19.0 C 4- X 2 5 5,957,161-34 1517,741.31 , 03 84 12.4 .0 CD4-X26 5 957 157.10 1.517.721.97 70' 17 30.558 150' 59' 36.146" 2273' 554 12.4 19.5 C04-227 5,95715`N.94 1,517,702.56 70' 17' 30.505" 150' 59' 36.709 2268' 574' t2.4 1(a GD4-X27 5,957,15U.77 1 51 7.6Y7.37 70' 17 0,492 150' 9 60 2 66 579- 12.4 1 .4 GD4-X28 7 146. 4 1 51 7 578.3 70' 17 . 45 15 • 59 2 .411 61 598 12.4 1 .8 J KUUKPIK NOTES: GAe 1. COORDINATES SHOWN HEREON ARE ALASKA STATE PLANE, ZONE 4, NAD 83.m=Fum 2. ELEVATIONS SHOWN ARE BRITISH PETROLEUM MEAN SEA LEVEL (B.P.M.S.L,) 1p nl Survey Office ALPINE MODULE: CD40 UNIT: CD ConocoPhilli S ALPINE PROJECT CO-4 WELL CONDUCTORS Alaska, Inc. AS -BUILT LOCATIONS CARD F1LE NO. DRAWING N0; PART: REV: 05-03-03-18-2 10/11/05 1 0E-CD40-121 1 2 OF 3 10 11:24, August 29 2019 CD4-594 wp14 13-3/8 x 16 9- 5/8 x 12-1/4 7 x 8-3/4 4-1/2 x 6-1/8 > 5 m m 0 C) j 0 0 4500 9000 13500 18000 Measured Depth A000 13-3/8 x 16-� - 19+27+1 @ 47.00usft (D141) iE W 0 00 20 0$ (0 4-1/2 x 6-1/8 9- 5/8 x 12-1 /4 7 x 8-3/4 - b o 0 0 0 0 U h O O O O O o 0 - O t' O o ... ^ q} 0 0 O O 0 3000 6000 9000 12000 15000 18000 400 800 1200 1600 2000 2400 2800 Depth From Depth To Survey/Plan Tool 28.00 1600,00 CD4-594PH1 wp13 GYD-GC-SS 160000 290000 CD4-594PH1 13 MWD IFR2 SAG+MS DDI ' 7.256 Plan Summa 0 0 ---- 10307 10307 - 10490 10490 - 10680 10680 - 10860 10860 - 11050 11050 - 11230 11230 - 11420 11420 - 11600 11600 - 12010 12010 12430 12430 - 12840 12840 - 13250 30 13250 '-- 13660 13660 - 14070 14070 - 14490 14490 - 14900 14900 - 15730 15730 - 16570 16570 - 17400 17400 - 18230 18230 - 19070 19070 19900 i9900 - 20730 20730 21563 Wp + 2900.0010250.00 CD4-594PH1 wp13 MWD+IFR2+SAG+MS 10250.0010307.00 CD4-594PH1 wpQ MWD+IFR2+SAG+MS 10307.0011800.00 CD4-594 wp14 (CD4-594) MWD OWSG 10307.00, 4770.00 CD4-594 wp14 (CD4-594) MWD+IFR2+SAG+MS TVD MD Name 4061.00 14776.95 7 x 8-3/4 4061 00 14778.95 4-1 /2 x 6-1 /8 180 Magnetic Model & Date: BGGM2018 01-Nov-19 14770.0016270.00 C04-594wp14 (CD4-594) MWD OWSG Magnetic North is 15.96° East of True North (Magnetic Declination) 14770.0021562.58 C04-594 wp 14(CD4-594) MWD+IFR2+SAG+M3 Magnetic Dip &Field Strength: 80.72° 57367nT Sec MD Inc Azi TVD +NI-S +FJ-W Dleg TFace VSect Target Annotation 1 10307.00 82.49 122.29 3453.57-4072.46 7472.59 0.00 0.00 8342.60 KOP: 2°/100' DLS, 180' TF, for 95' Lithology Column 210402.00 80.59 122.29 3467.55-4122.65 7552.02 2.00 180.00 8435.72 Adjust TF to 0.53°, fa 92.37 310494.37 82.44 122.30 3481.18 4171.46 7629.24 2.00 0.53 8526.25 Hold for 3512,69' 414007.06 82.44 122.30 3943.45-6032.37 10572.42 0.00 0,0011977.18 Start 3°I100' DLS, 101.23' TF, for 258.32' 514265.38 81.00 130.00 3980.71 -6183.03 10778.68 3.00 101.2312232.03 Hold for 200' t- 0 614465.38 81.00 130.00 4012.00 -6310.00 10930.00 0.00 0.0012429.56 Adjust TF to 0°, for 20' 714485.38 81.00 130.00 4015.13 -6322.70 10945.13 0.00 0.0012449.32 Start 1.5°1100' DLS, 89.9° TF, for 204,92' 814690.29 81.02 133.11 4047.16 6456.94 11096.57 1.50 89.9012651.61 Hold for 300.5V 914990.80 81.02 133.11 4094.07 -6659.80 11313.26 0.00 0.0012948.00 Start 3°1100' DLS, 87.92° TF, for 557.67' 1015548.48 82.00 150.00 4177.00-7090.22 11654.81 3.00 87.9213486.27 Hold for 93.41' 11 15641.89 82.00 150.00 4190.00-7170.33 11701.06 0.00 0.0013573.18 Start 2°1100' DLS, 0° TF, for 270.09' 1215911.97 87.40 150.00 4214,93-7403.14 11835.48 2.00 0.0013825.77 Hold for 2738' 1318649.98 87.40 150.00 4339.05-9771.89 13203.06 0.00 0,0016395.71 Start 2°/100' DLS, 0° TF, for 129.91' 1418779.89 90.00 150.00 4342.00-9884.36 13268.00 2.00 0,0016517.73 Adjust TF to -0.1', for 137.27' 1518917.16 92.75 150.00 4338.71-10003.19 13336.61 2.00 -0.1016646.66 Hold for 2645.42' K-3 16 21562.58 92.75 150.00 4212.00-12291.45 14658.00 0,00 0.0019129.47 TD: 21562.58' MD, 4212' TVD 7 S 60 Permit Pack Top Narwhal 41-aTDp Narwhal I TIE!' 11 By signing this I acknowledge that I have been informed of all risks, checked that the data is correct, ensured it's completeness, and all surrounding wells are assigned to the proper position, and I approve the scan and collision avoidance plan as set out in the audit "1 pack.l approve it as the basis for the final well plan and wellsite drawings. I also acknowledge that unless notified otherwise all targets have a 100 feet lateral tolerance. repared by hecked by ccepted by Approved by: S. DeLapp V. Osara J. Ryan CoP DE 15:56, August 26 2019 CD4-594 wp14 10300.00 To 15100.61 Spider C 4-07 i CD - CD -208 CD -301 B C D4-1 q0D 208P6 CD4-3 D4- D4- 04 CD4- CD4- CD4-30 A NaFlMr D4-32 1 n C\ - 18A 2 ), , PD4-301 CD4 0 � C 3 D4-2 CD4 25 CD4- 21 o z PB - 1 CD 1 B1 CD4-59 PH1 wp 3 D 4-28 C 44 2 4 D4- 92 CD4- 09 FD4bou,lp 3 D4-214 A PB1 I n\41; ROH1 CD -27 B3 C 4-594 w 14 D4 2 OB D4-27 CD4- - CD4-96 PB1 CD4- OAPB D4 208 CC 4-210A i Easting (4500 usfUin) 15:57, August 26 2019 CD4-594 wp14 10300.00 To 15100.61 Spider C 4-298P 13 1 D4-298 D4-291 1 F CD4-32 D4-290 C 4-594P 1 w 13 0 0 N C -292 4-291 C-N 289 1D C 1= 0 ZNanuq CE 4-209 D4-499 v,p08 Wes C 4-595PH CD4- 4 wp14 C 4-595 Easting (2000 usft/in) -2500 0 w m 2500 a� a� 1 5000 7500 CD4-594 wp14 Section Vipw 0 2500 5000 7500 10000 12500 15000 17500 20001 Vertical Section at 129.98' CD4-594 wp14 Plan Vnew While drilling production section, stay within 100 feet laterally of plan, unless notified otherwise. o 0 0 __ M 1p °O �O 00 O 13-3/8 x 16 O -2500 _°� o o° �o �, o0 .o 0 ':;:15000 0 7 x 8-3/4 _ _ 9- 5/8 x 12-1/4 i O Z O O V •J L 0 Ct)-7500 000 �6 -10000 c�9 GO� 0°00 2 4-1/2 x 6-1/8 2��63 -12500 0 2500 5000 7500 10000 12500 15000 West( -)/East(+) ConocoPhillips Alaska Inc_WNS Western North Slope CD4 Nanuq Pad Plan: CD4-594 50103xxxxx00 CD4-594 Plan: C134-594 wp14 Standard Proposal Report 29 August, 2019 ConocoPhillips ConoPhillips p Database: EDT 14 Alaska Production Company: ConocoPhillips Alaska Inc_WNS Project: Western North Slope Site: CD4 Nanuq Pad Well: Plan: CD4-594 Wellbore: CD4-594 Design: CD4-594 wp14 ConocoPhillips Standard Proposal Report Local Co-ordinate Reference: Well Plan: CD4-594 TVD Reference: 19+27+1 @ 47.00usft (D141) MD Reference: 19+27+1 @ 47.00usft (D141) North Reference: True Survey Calculation Method: Minimum Curvature Project Western North Slope, North Slope Alaska, United States Map System: System Datum: Mean Sea Level Geo Datum: Using Well Reference Point Map Zone: Using geodetic scale factor Site Site Position: From: Position Uncertainty: CD4 Nanuq Pad Map 0.00 usft Well Plan CD4-594 Well Position +N/-S 29.29 usft +E/-W 116.18 usft Position Uncertainty 0.00 usft 19.00 usft Wellbore CD4-594 Magnetics Model Name Sample Date Declination Dip Angle Field Strength (nT) BGG M2018 11 /1 /2019 15.96 80.72 57,367 Design CD4-594 wp14 Audit Notes: Version: Phase: PLAN Tie On Depth: 10,307.00 Vertical Section: Depth From (TVD) +N/-S +E/-W Direction (usft) (usft) (usft) (1) 28.00 0.00 0.00 129.98 Plan Survey Tool Program Date 8/29/2019 Depth From Depth To (usft) (usft) Survey (Wellbore) Tool Name Remarks 1 10,307.00 11,800.00 CD4-594 wp14 (CD4-594) MWD OWSG OWSG MWD - Standard 2 10,307.00 14,770,00 CD4-594 wp14 (CD4-594) MWD+IFR2+SAG+MS OWSG MWD + IFR2 + Sag + D 3 14,770.00 16,270.00 CD4-594 wpl4 (CD4-594) MWD OWSG OWSG MWD - Standard 4 14.770.00 21,562 58 CD4-594 wp14 (CD4-594) MWD+IFR2+SAG+MS OWSG MWD + IFR2 + Sag + h 8/29/2019 11:48:48AM Page 2 COMPASS 5000.14 Build 65H ConocoPhillips Database: EDT 14 Alaska Production Company: ConocoPhillips Alaskalnc_WNS Project: Western North Slope Site: CD4 Nanuq Pad Well: Plan: CD4-594 Wellbore: CD4-594 Design: CD4-594 wp14 Plan Sections Measured Depth Inclination Azimuth (usft) (°) N 10,307.00 82A9 122.29 10,402.00 80.59 122.29 10,494.37 82.44 122.30 14,007.06 82.44 122.30 14,265.38 81.00 130.00 14,465.38 81.00 130.00 14,485.38 81.00 130.00 14,690.29 81.02 133.11 14,990.80 81.02 133.11 15,548.48 82.00 150.00 15,641.89 82.00 150.00 15,911.97 87.40 150.00 18,649.98 87.40 150.00 18,779.89 90.00 150.00 18,917.16 92.75 150.00 21,562.58 92.75 150.00 Local Co-ordinate Reference: TVD Reference: MD Reference: North Reference: Survey Calculation Method: Vertical Depth +NI-S +EI-W (usft) (usft) (usft) 3,453.57-4,072.46 7,472.59 3,467.55 -4,122.65 7,552.02 3,481.18 -4,171.46 7,629.24 3,943.45-6,032.37 10,572.42 3,980.71-6,183.03 10,778.68 4,012.00-6,310.00 10,930.00 4,015.13-6,322.70 10,945.13 4,047.16-6,456.94 11,096.57 4,094.07-6,659.80 11,313.26 4,177.00-7,090.22 11,654.81 4,190.00-7,170.33 11,701.06 4,214.93-7,403.14 11.835.48 4,339.05-9,771.89 13,203.07 4,342.00-9,884.36 13,268.00 4,338.71-10,003.19 13,336.62 4,212.00-12,291.45 14,658.00 ConocoPhillips Standard Proposal Report Well Plan: CD4-594 19+27+1 @ 47.00usft (D141) 19+27+1 @ 47.00usft (D141) True Minimum Curvature Dogleg Build Turn Rate Rate Rate TFO ('1100usft) (°/100usft) (61100usft) (1) 0.00 0.00 0.00 0.00 2.00 -2.00 0.00 180.00 2.00 2.00 0.02 0.53 0.00 0.00 0.00 0.00 3.00 -0.56 2.98 101.23 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 1.50 0.01 1.52 89.90 0.00 0.00 0.00 0.00 3.00 0.18 3.03 87.92 0.00 0.00 0.00 0.00 2.00 2.00 0.00 0.00 0.00 0.00 0.00 0.00 2.00 2.00 0.00 0.00 2.00 2.00 0.00 -0.10 0.00 0.00 0.00 0.00 Target 8/292019 11:48:48AM Page 3 COMPASS 5000 14 Build 85H ConocoPhillips p ConocoPhillips Standard Proposal Report Database: EDT 14 Alaska Production Local Co-ordinate Reference: Well Plan: CD4-594 Company: ConocoPhillips Alaska Inc_WNS TVD Reference: 19+27+1 @ 47.O0usft (D141) Project: Western North Slope MD Reference: 19+27+1 @ 47.00usft (D141) Site: CD4 Nanuq Pad North Reference: True Well: Plan: CD4-594 Survey Calculation Method: Minimum Curvature Wellbore: CD4-594 Design: CD4-594 wp14 Planned Survey Measured Vertical Vertical Dogleg Build Turn Depth Inclination Azimuth Depth +N/-S +E/-W Section Rate Rate Rate (usft) (1) (1) (usft) (usft) (usft) (usft) (°/100usft) (°/100usft) (°/100usft) 10,307.00 82.49 122.29 3,453.57 -4,072.46 7,472.59 8,342.60 0.00 0.00 0,00 KOP: 2°/100' DLS, 180° TF, for 96' 10,400.00 80.63 122.29 3,467.22 -4,121.59 7,550.36 8,433.76 2.00 -2.00 0,00 10,402.00 80.59 122.29 3,467.55 -4,122.65 7,552.02 8,435.72 2.00 -2.00 0.00 Adjust TF to 0.53°, for 92.37' 10,494.37 82.44 122.30 3,481.18 4,171.46 7,629.24 8,526.25 2.00 2.00 0.02 Hold for 3512.69' 10,500.00 82.44 122.30 3,481.92 -4,174.44 7,633.96 8,531.79 0.00 0.00 0.00 10.600.00 82.44 122.30 3,495.08 -4,227.42 7,717.75 8,630.03 0.00 0.00 0.00 10,700.00 82.44 122.30 3,508.24 -4,280.39 7,801.54 8,728.27 0.00 0.00 0.00 10,800.00 82.44 122.30 3,521.40 -4,333.37 7,885.32 8.826.51 0.00 0.00 0.00 10,900.00 82.44 122.30 3,534.56 -4,386.35 7,969.11 8,924.75 0.00 0.00 0.00 11,000.00 82.44 122.30 3,547.72 -4,439.32 8,052.90 9,022.99 0.00 0.00 0.00 11,100.00 82.44 122.30 3.560.88 -4,492.30 8,136.68 9,121.24 0.00 0.00 0.00 11,200.00 82.44 122.30 3,574.04 -4,545.28 8,220.47 9,219.48 0.00 0.00 0.00 11,300.00 82.44 122.30 3,587.20 -4,598.25 8,304.26 9,317.72 0.00 0.00 0.00 11,400.00 82.44 122.30 3,600.36 -4,651.23 8,388.05 9,415.96 0.00 0.00 0.00 11,500.00 82.44 122.30 3,613.52 -4,704.21 8,471.83 9,514.20 0.00 0.00 0.00 11,600.00 82.44 122.30 3,626.68 -4,757.19 8,555.62 9,612.44 0.00 0.00 0.00 11.700.00 82.44 122.30 3,639.84 -4,810.16 8,639.41 9,710.69 0.00 0.00 0.00 11,800.00 82.44 122.30 3,653.00 -4,863.14 8,723.19 9,808.93 0.00 0.00 0.00 11,900.00 82.44 122.30 3,666.16 -4,916.12 8,806.98 9,907.17 0.00 0.00 0.00 12,000.00 82.44 122.30 3,679.32 -4,969.09 8,890.77 10,005.41 0.00 0.00 0.00 12,100.00 82.44 122.30 3,692.48 -5,022.07 8,974.55 10,103.65 0.00 0.00 0.00 12,200.00 82.44 122.30 3,705.64 -5,075.05 9,058.34 10,201.89 0.00 0.00 0.00 12,300.00 82.44 122.30 3,718.80 -5,128.02 9,142.13 10,300.14 0.00 0.00 0.00 12,400.00 82.44 122.30 3,731.96 -5,181.00 9,225.92 10,398.38 0.00 0.00 0.00 12,500.00 82.44 122.30 3,745.12 -5,233.98 9,309.70 10,496.62 0.00 0.00 0.00 12,600.00 82.44 122.30 3,758.28 -5,286.95 9,393.49 10,594.86 0.00 0.00 0.00 12,700.00 82.44 122.30 3,771.44 -5,339.93 9,477.28 10,693.10 0.00 0.00 0.00 12,800.00 82.44 122.30 3,784.60 -5.392.91 9,561.06 10,791.34 0.00 0.00 0.00 12,900.00 82.44 122.30 3,797.76 -5,445.89 9,644.85 10,889.59 0.00 0.00 0.00 13,000.00 82.44 122.30 3,810.92 -5,498.86 9,728.64 10,987.83 0.00 0.00 0.00 13,100.00 82.44 122.30 3,824.08 -5,551.84 9,812.42 11,086.07 0.00 0.00 0.00 13,200.00 82.44 122.30 3,837.24 -5,604.82 9,896.21 11,184.31 0.00 0.00 0.00 13,243.74 82.44 122.30 3,843.00 -5,627.99 9,932.86 11,227.29 0.00 0.00 0.00 K-3 13,300.00 82.44 122.30 3,850.40 -5,657.79 9,980.00 11,282.55 0.00 0.00 0.00 13,400.00 82.44 122.30 3,863.56 -5,710.77 10,063.79 11,380.80 0.00 0.00 0.00 13,500.00 82.44 122.30 3,876.72 -5,763.75 10,147.57 11,479.04 0.00 0.00 0.00 13,600.00 82.44 122.30 3,889.88 -5,816.72 10,231.36 11,577.28 0.00 0.00 0.00 13,700.00 82.44 122.30 3,903.04 -5,869.70 10,315.15 11,675.52 0.00 0.00 0.00 13,800.00 82.44 122.30 3,916.20 -5,922.68 10,398.93 11,773.76 0.00 0.00 0.00 13,900.00 82.44 122.30 3,929.36 -5,975.65 10,482.72 11,872.00 0.00 0.00 0.00 14,000.00 82.44 122.30 3,942.52 -6,028.63 10,566.51 11,970.25 0.00 0.00 0.00 14,007.06 82.44 122.30 3,943.45 -6,032.37 10,572.42 11,977.18 0.00 0.00 0.00 Start 3°/100' DLS, 101.23° TF, for 258,32' 14,100.00 81.90 125.07 3,956.12 -6,083.43 10,649.03 12,068.69 3,00 -0.57 2.97 14,200.00 81.35 128.05 3,970.68 -6,142.35 10,728.49 12,167.44 3.00 -0.55 2.98 14,265.38 81.00 130.00 3,980.71 -6,183.03 10,778.68 12,232.03 3.00 -0.53 2.99 Hold for 200' 14,300.00 81.00 130.00 3,986.13 -6,205.01 10,804.87 12,266.22 0.00 0.00 0.00 14,400.00 81.00 130.00 4,001.77 -6,268.49 10,880.54 12,364.99 0.00 0.00 0.00 6/29/2019 11 48:48AM Page 4 COMPASS 5000.14 Build 85H ConocoPhillips ConocoPhillips Standard Proposal Report Database: Company: Project: Site: Well: Wellbore: Design: EDT 14 Alaska Production ConocoPhillips Alaska Inc_WNS Western North Slope CD4 Nanuq Pad Plan: CD4-594 CD4-594 CD4-594 wp14 Local Co-ordinate Reference: TVD Reference: MD Reference: North Reference: Survey Calculation Method: Well Plan: CD4-594 19+27+1 @ 47.00usft (D141) 19+27+1 @ 47.00usft (D141) True Minimum Curvature Planned Survey Measured Vertical Vertical Dogleg Build Turn Depth Inclination Azimuth Depth +N/-S +E/_W Section Rate Rate Rate (usft) (°) (°) (usft) (usft) (usft) (usft) (°/100usft) (°/10ousft) (°/100usft) 14,465.38 81.00 130.00 4,012.00 -6,310.00 10,930.00 12,429.56 0.00 0.00 0.00 Adjust TF to 0°, for 20' 14,485.38 81.00 130.00 4,015.13 -6,322.70 10,945.13 12,449.32 0.00 0.00 0.00 Start 1.5°1100' DLS, 89.9° TF, for 204.92' 14,500.00 81.00 130.22 4,017A2 -6,332.00 10,956.18 12,463.76 1.50 0.00 1.52 14,600.00 81.01 131.74 4,033.05 -6,396.78 11,030.74 12,562.51 1.50 0.01 1.52 14,690.29 81.02 133.11 4,047.16 -6,456.94 11,096.57 12,651.62 1.50 0.01 1,52 Hold for 300.51' 14,700.00 81.02 133.11 4,048.67 -6,463.49 11,103.57 12,661.19 0.00 0.00 0,00 14,778.95 81.02 133.11 4,061.00 -6,516.79 11,160.50 12,739.05 0.00 0.00 0.00 7 x 8-3/4 14,800.00 81.02 133.11 4,064,29 -6,531.00 11,175.68 12,759.81 0.00 0.00 0.00 14,875.03 81.02 133.11 4,076.00 -6,581.65 11,229.78 12,833.82 0.00 0.00 0.00 Top Narwhal Central 14,900.00 81.02 133.11 4,079.90 -6,598.50 11,247.78 12,858.44 0.00 0.00 0.00 14,990.80 81.02 133.11 4,094.07 -6,659.80 11,313.26 12,948.00 0.00 0.00 0.00 Start 3°/100' DLS, 87.92° TF, for 557.67' 15,000.00 81.03 133.39 4,095.51 -6,666.02 11,319.87 12,957.07 3.00 0.11 3.04 15,100.00 81.15 136.43 4,111.00 -6,735.76 11,389.83 13,055.48 3.00 0.12 3.03 15,200.00 81.30 139.46 4,126.26 -6,809.13 11,456.03 13,153.35 3.00 0.15 3.03 15,300.00 81A7 142.49 4,141.24 -6,885.93 11,518.28 13,250.39 3.00 0.17 3.03 15,400.00 81.67 145.51 4,155.90 -6,965.95 11,576.42 13,346.36 3.00 0.20 3.03 15,428.40 81.73 146.37 4,160.00 -6,989.23 11,592.16 13,373.37 3.00 0.21 3.02 Top Narwhal Lefty 15,500.00 81.89 148.54 4,170.21 -7,048.96 11,630.28 13,440.97 3.00 0.22 3.02 15,548.48 82.00 150.00 4,177.00 -7,090.22 11,654.81 13,486.27 3.00 0.23 3.02 Hold for 93.41' 15,600.00 82.00 150.00 4,184.17 -7,134.41 11,680.32 13,534.21 0.00 0.00 0.00 15,641.89 82.00 150.00 4,190.00 -7,170.33 11,701.06 13,573.18 0.00 0.00 0.00 Start 2°/100' DLS, 0° TF, for 270.09' 15,700.00 83.16 150.00 4,197.50 -7,220.23 11,729.87 13,627.33 2.00 2.00 0.00 15,800.00 85.16 150.00 4,207.67 -7,306.38 11,779.61 13,720.80 2.00 2.00 0.00 15,900.00 87.16 150.00 4,214.37 -7,392.79 11,829.50 13,814.54 2.00 2.00 0.00 15,911.97 87.40 150.00 4,214.93 -7,403.14 11,835.48 13,825.77 2.00 2.00 0.00 Hold for 2738' 16,000.00 87.40 150.00 4,218.93 -7,479.30 11,879.44 13,908.40 0.00 0.00 0.00 16,100.00 87.40 150.00 4,223.46 -7,565.81 11,929.39 14,002.26 0.00 0.00 0.00 16,200.00 87.40 150.00 4,227.99 -7,652.33 11,979.34 14,096.12 0.00 0.00 0.00 16,300.00 87.40 150.00 4,232.52 -7,738.84 12,029.29 14,189.98 0.00 0.00 0.00 16,400.00 87.40 150.00 4,237.06 -7,825.35 12,079.24 14,283.85 0.00 0.00 0.00 16,500.00 87.40 150.00 4,241.59 -7,911.87 12,129.19 14,377.71 0.00 0.00 0.00 16,600.00 87.40 150.00 4,246.12 -7,998.38 12,179.14 14,471.57 0.00 0.00 0.00 16,700.00 87.40 150.00 4,250.66 -8,084.89 12,229.08 14,565.43 0.00 0.00 0.00 16,800.00 87.40 150.00 4,255.19 -8,171.41 12,279.03 14,659.29 0.00 0.00 0.00 16,900.00 87.40 150.00 4,259.72 -8,257.92 12,328.98 14,753.15 0.00 0.00 0.00 17,000.00 87.40 150.00 4,264.26 -8,344.44 12,378.93 14,847.01 0.00 0.00 0.00 17,100.00 87.40 150.00 4,268.79 -8,430.95 12,428.88 14,940.88 0.00 0.00 0.00 1 17,200.00 87.40 150.00 4,273.32 -8,517.46 12,478.83 15,034.74 0.00 0.00 0.00 17,300.00 87.40 150,00 4,277.86 -8,603.98 12,528.77 15,128.60 0.00 0.00 0.00 17,400.00 87.40 150.00 4,282.39 -8,690.49 12,578.72 15,222.46 0.00 0.00 0.00 17,500.00 87.40 150.00 4,286.92 -8,777.00 12,628.67 15,316.32 0.00 0.00 0.00 17,600.00 87.40 150.00 4,291.46 -8,863.52 12,678.62 15,410.18 0.00 0.00 0.00 17,700.00 87.40 150.00 4,295.99 -8,950.03 12,728.57 15,504.05 0.00 0.00 0.00 8/292019 11:48:48AM Page 5 COMPASS 5000 14 Build 85H ConocoPhillips Database: Company: Project: Site: Well: Wellbore: Design: Planned Survey Measured Depth (usft) EDT 14 Alaska Production ConocoPhillips Alaska Inc_WNS Western North Slope CD4 Nanuq Pad Plan: CD4-594 CD4-594 CD4-594 wp14 Inclination Azimuth (1) (1) 17,800.00 87.40 150.00 17,900,00 87.40 150.00 18,000.00 87.40 150.00 18,100.00 87.40 150.00 18,200.00 87.40 150.00 18,300.00 87.40 150.00 18,400.00 87.40 150.00 18,500.00 87.40 150.00 18,600.00 87.40 150.00 18.649.98 87.40 150.00 Start 2.1100' DLS, 0° TF, for 129.91' 18,700.00 88.40 150.00 18,779.89 90.00 150.00 Adjust TF to -0.1°, for 137.27' 18,800.00 90.40 150.00 18,900.00 92.40 150.00 18,917.16 92.75 150.00 Hold for 2645.42' 19,000.00 92.75 150.00 19,100.00 92.75 150.00 19,200.00 92.75 150.00 19,300.00 92.75 150.00 19,400.00 92.75 150.00 19,500.00 92.75 150.00 19,600.00 92.75 150.00 19,700.00 92.75 150.00 19,800.00 92.75 150.00 19,900.00 92.75 150.00 20,000.00 92.75 150.00 20,100.00 92.75 150.00 20,200.00 92.75 150.00 20,300.00 92.75 150.00 20,400.00 92.75 150.00 20,500.00 92.75 150.00 20,600.00 92.75 150.00 20,700.00 92.75 150.00 20,800.00 92.75 150.00 20,900.00 92.75 150.00 21,000.00 92.75 150.00 21,100.00 92.75 150.00 21,200.00 92.75 150.00 21,300.00 92.75 150.00 21,400.00 92.75 150.00 21,500.00 92.75 150.00 21,562.58 92.75 150.00 TD: 21562.58' MD, 4212' iVD - 4-112 x 6-1/8 Local Co-ordinate Reference: ND Reference: MD Reference: North Reference: Survey Calculation Method: ConocoPhillips Standard Proposal Report Well Plan: CD4-594 19+27+1 @ 47.00usft (D141) 19+27+1 @ 47.00usft (D141) True Minimum Curvature Vertical Vertical Dogleg Build Turn Depth +N/-S +E/-W Section Rate Rate Rate (usft) (usft) (usft) (usft) (°1100usft) (°/100usft) (°/100usft) 4,300.52 -9,036.54 12,778.52 15,597.91 0,00 0.00 0.00 4,305.06 -9,123.06 12,828.46 15,691.77 0.00 0.00 0.00 4,309.59 -9,209.57 12,878.41 15,785.63 0.00 0.00 0.00 4,314.12 -9,296.09 12,928.36 15,879.49 0.00 0.00 0.00 4,318.66 -9,382.60 12,978.31 15,973.35 0.00 0.00 0.00 4,323.19 -9,469.11 13.028.26 16,067.21 0.00 0.00 0.00 4,327.72 -9,555.63 13,078.21 16,161.08 0.00 0.00 0.00 4,332.26 -9,642.14 13,128.15 16,254.94 0.00 0.00 0.00 4,336.79 -9,728.65 13,178.10 16,348.80 0.00 0.00 0.00 4,339.05 -9,771.89 13,203.07 16,395.71 0.00 0.00 0.00 4,340.89 -9,815.18 13,228.06 16,442.68 2.00 2.00 0.00 4,342.00 -9,884.36 13,268.00 16,517.73 2.00 2.00 0.00 4,341.93 -9,901.78 13,278.06 16,536+63 2.00 2.00 0.00 4,339.48 -9,988.35 13,328.04 16,630.55 2.00 2.00 0.00 4,338.71 -10,003.19 13,336+62 16,646.66 2.00 2.00 0.00 4,334.74 -10,074.85 13,377.99 16,724.41 0.00 0.00 0.00 4,329.95 -10,161.35 13.427.94 16,818.26 0.00 0.00 0.00 4,325.16 -10,247.84 13,477.89 16,912.11 0.00 0.00 0.00 4,320+37 -10,334.34 13,527.84 17,005+97 0.00 0.00 0.00 4,315.58 -10,420.84 13,577.79 17,099+82 0.00 0.00 0.00 4,310.79 -10,507.34 13,627.74 17,193.67 0.00 0.00 0.00 4,306.00 -10,593.84 13,677.69 17,287.53 0.00 0.00 0.00 4,301.22 -10,680.34 13,727+64 17,381.38 0.00 0.00 0.00 4,296.43 -10,766.84 13,777.59 17,475.23 0.00 0.00 0.00 4,291.64 -10,853.34 13,827.54 17,569.09 0.00 0.00 0.00 4,286.85 -10,939.84 13,877.49 17,662.94 0.00 0.00 0.00 4,282.06 -11,026.33 13,927.44 17,756.79 0.00 0.00 0.00 4,277.27 -11,112.83 13,977.39 17,850.65 0.00 0.00 0.00 4,272.48 -11,199.33 14,027.34 17,944+50 0.00 0.00 0.00 4,267.69 -11,285.83 14,077.29 18,038.35 0.00 0.00 0.00 4,262.90 -11,372.33 14,127.24 18,132.21 0.00 0.00 0.00 4,258.11 -11,458.83 14,177.19 18,226.06 0.00 0.00 0.00 4,253.32 -11,545.33 14,227.14 18,319.91 0.00 0.00 0.00 4,248.53 -11,631.83 14,277.09 18,413.77 0.00 0.00 0.00 4,243.74 -11.718.33 14,327.04 18,507.62 0.00 0.00 0.00 4,238.95 -11,804.82 14,376.99 18,601.47 0.00 0.00 0.00 4,234.16 -11,891.32 14,426.94 18,695.33 0.00 0.00 0.00 4,229.37 -11,977.82 14,476.89 18,789.18 0.00 0.00 0.00 4,224.58 -12,064.32 14,526.84 18,883.03 0.00 0.00 0.00 4,219.79 -12,150.82 14,576.79 18,976.89 0.00 0.00 0.00 4,215.00 -12,237.32 14,626.74 19,070.74 0.00 0.00 0.00 4,212.00 -12.291.45 14,658.00 19,129.47 0.00 0.00 0.00 8/292019 11:48:48AM Page 6 COMPASS 5000.14 Build 85H ConocoPhillips Database: EDT 14 Alaska Production Local Co-ordinate Reference Company: ConocoPhillips Alaska Inc_WNS TVD Reference: Project: Western North Slope MD Reference: Site: CD4 Nanuq Pad North Reference: Well: Plan: CD4-594 Survey Calculation Method: Wellbore: CD4-594 Design: CD4-594 wp14 Design Targets Target Name hit/miss target Dip Angle Dip Dir. TVD +N/-S +E/-W Shape (1) (1 (usft) (usft) (usft) CD4-594 Tgt 1 Heel v4 0.00 0.00 4,177.00-7,090.22 11,634.81 plan misses target center by 17.35usft at 15538.36usft MD (4175.59 TVD,-7081.55 N, 11649.78 E) Circle (radius 100.00) CD4-594 Tgt QM 0.00 0.00 4,177.00-7,090.22 11,634.81 plan misses target center by 17.35usft at 15538.36usft MD (4175.59 TVD,-7081.55 N, 11649.78 E) Circle (radius 1,320.00) CD4-594 Tgt 3 TD v4 0.00 0.00 4,212.00-12,291.45 14,644.93 plan misses target center by 11.32usft at 21556.05usft MD (4212.31 TVD,-12285.80 N, 14654.74 E) Circle (radius 100.00) CD4-594 Tgt 3 QM 0.00 0.00 4,212.00-12,291.45 14,644.93 plan misses target center by 11.32usft at 21556.05usft MD (4212.31 TVD,-12285.80 N, 14654.74 E) Circle (radius 1,320.00) CD4-594 Tgt 2 Toe v4 0.00 0.00 4,342.00-9,884.36 13,325.55 plan misses target center by 49.84usft at 18808.66usft MD (4341.86 TVD,-9909.28 N, 13282.39 E) Circle (radius 100.00) CD4-594 Tgt 2 QM 0.00 0.00 4,342.00-9,884.36 13,325.55 plan misses target center by 49.84usft at 18808.66usft MD (4341.86 TVD,-9909.28 N, 13282.39 E) Circle (radius 1,320.00) Casing Points ConocoPhillips Standard Proposal Report Well Plan: CD4-594 19+27+1 @ 47.00usft (D141) 19+27+1 @ 47.00usft (D141) True Minimum Curvature Measured Vertical Casing Hole Depth Depth Diameter Diameter (usft) (usft) Name (in) (in) 2,910.87 2,397.00 13-3/8 x 16 13.375 16.000 10,256.74 3,447.00 9- 5/8 x 12-1/4 9.625 12.250 14,778.95 4,061.00 7 x 8-3/4 7,000 8.750 21,562.58 4,212.00 4-1/2x6-1/8 4.500 6.125 Formations Measured Vertical Dip Depth Depth Dip Direction (usft) (usft) Name Lithology (1) (�) 13,243.74 3,843.00 K-3 0.00 14,875.03 4,076.00 Top Narwhal Central 0.00 15,428.40 4,160.00 Top Narwhal Lefty 0.00 8/29/2019 11:48:48AM Page 7 COMPASS 5000.14 Build 85H ConocoPhillips Database: EDT 14 Alaska Production Company: ConocoPhillips Alaska Inc_WNS Project: Western North Slope Site: CD4 Nanuq Pad Well: Plan: CD4-594 Wellbore: CD4-594 Design: CD4-594 wp14 Plan Annotations ConocoPhillips Standard Proposal Report Local Co-ordinate Reference: Well Plan: CD4-594 TVD Reference: 19+27+1 @ 47.00usft (D141) MD Reference: 19+27+1 @ 47.00usft (D141) North Reference: True Survey Calculation Method: Minimum Curvature Measured Vertical Local Coordinates Depth Depth +NI-S +E/-W (usft) (usft) (usft) (usft) Comment 10,307.00 3,453.57 -4,072.46 7,472.59 KOP: 20/100' DLS, 1800 TF, for 95' 10,402.00 3,467.55 -4,122.65 7,552.02 Adjust TF to 0.53°, for 92.37' 10,494.37 3,481.18 -4,171.46 7,629.24 Hold for 3512.69' 14,007.06 3.943.45 -6,032.37 10,572.42 Start 3*/100' DLS, 101.23' TF, for 258.32' 14,265.38 3,980.71 -6,183.03 10,778.68 Hold for 200' 14,465.38 4,012.00 -6,310.00 10,930.00 Adjust TF to 00, for 20' 14,485.38 4,015.13 -6,322.70 10,945.13 Start 1.5'/100' DLS, 89.9° TF, for 204.92' 14,690.29 4,047.16 -6,456.94 11,096.57 Hold for 300.51' 14,990.80 4,094.07 -6,659.80 11,313.26 Start Y/100' DLS, 87.92° TF, for 557.67' 15,548.48 4,177.00 -7,090.22 11,654.81 Hold for93.41' 15,641.89 4,190.00 -7,170.33 11,701.06 Start 2'/100' DLS, 0° TF, for 270.09' 15,911.97 4.214.93 -7,403.14 11,835.48 Hold for2738' 18,649.98 4,339.05 -9,771.89 13,203.07 Start 2°I100' DLS, 0° TF, for 129.91' 18,779.89 4,342.00 -9,884.36 13,268.00 Adjust TFto-0.1°,for 137.27' 18,917.16 4,338.71 -10,003.19 13,336.62 Hold for 2645.42' 21,562.58 4,212.00 -12,291.45 14,658.00 TD: 21562.58' MD, 4212' TVD 8/292019 11:48:48AM Page 8 COMPASS 5000 14 Build 65H ConocoPhillips Alaska Inc_WNS Western North Slope CD4 Nanuq Pad Plan: C134-594 CD4-594 50103xxxxx00 C134-594 wp14 ConocoPhillips Clearance Summary Anticollision Report 29 August, 2019 Tray. Cylinder North Proximity Scan on Current Survey Data (North Reference) Reference Design: CD4 Nanuq Pad - Plan: CD4-594 - CD4-594 - CD4-594 wp14 Datum Height: 19+27+1 @ 47.00usft(13141) Scan Range: 10,307.00 to 21,562.58 usft. Measured Depth. Scan Radius is Unlimited . Clearance Factor cutoff is Unlimited. Max Ellipse Separation is 1,000.00 usft Geodetic Scale Factor Applied Version: 5000.14 Build: 85H Scan Type: GLOBAL FI LTER APPLIED: All wellpaths within 200'+ 100/1000 of reference Scan Type: 25.00 ConocoPhillips ConocoPhillips Anticollision Report for Plan: CD4-594 - C134-594 wp14 ConocoPhillips Alaska Inc_WNS Western North Slope Tray. Cylinder North Proximity Scan on Current Survey Data (North Reference) Reference Design: CD4 Nanuq Pad - Plan: CD4-594 - CD4-594 - CD4-594 wp14 Scan Range: 10,307.00 to 21,562.68 usft. Measured Depth. Scan Radius is Unlimited . Clearance Factor cutoff is Unlimited. Max Ellipse Separation is 1,000.00 usft Measured Minimum @Measured Ellipse @Measured Clearance Summary Based on Site Name Depth Distance Depth Separation Depth Factor Minimum Separation Warning Comparison Well Name - Wellbore Name - Design (usft) (usft) (usft) (usft) usft C04 Nanuq Pad CD4-301 - CD4-301 - CD4-301 CD4-301 - CD4-301 - CD4-301 CD4-595 - CD4-595 - CD4-595 CD4-595 - CD4-595 - CD4-595 CD4-595 - CD4-595 - CD4-595 CD4-595 - CD4-595PH1 - CD4-595PH1 CD4-595 - CD4-595PH1 - CD4-595PH1 Plan: CD4-594 - CD4-594PH1 - CD4-594PH1 wp13 Plan: CD4-594 - CD4-594PH1 - CD4-594PH1 wp13 Survey tool program 10,329.58 2,261.33 10,329.58 2,033.53 10,725.00 9.927 Ellipse Separation Pass - 10,389.50 2,268.96 10,389.50 2,039.84 10,750.00 9.903 Clearance Factor Pass - 10,314.54 1,736.78 10,314.54 1,399.38 10,250.00 5.148 Centre Distance Pass - 18,730.84 1,78354 18,730.84 1,315.08 17,700.00 3.807 Ellipse Separation Pass - 20,187.39 1,825.29 20,187.39 1,333.41 19,175.00 3.711 Clearance Factor Pass- 10,314.54 1,736.78 10,314.54 1,399.02 10,250.00 5.142 Ellipse Separation Pass - 18,200.64 1,932.27 18,200.64 1,524.66 17,275.00 4.740 Clearance Factor Pass - 1 0,624.24 22.79 10,624.24 19.38 10,625.00 6.682 Ellipse Separation Pass - 13,346.73 176.66 13,346.73 135.47 13,375.00 4.288 Clearance Factor Pass - From To Survey/Plan Survey Tool (usft) (usft) 28.00 1,600.00 GYD-GC-SS 1,600.00 2,900.00 MWD+IFR2+SAG+MS 2,900.00 10, 250.00 MWD+IFR2+SAG+M S 10, 250.00 10, 307.00 MWD+IFR2+SAG+M S 10,307.00 11,800.00 CD4-594 wp14 MWD OWSG 10,307.00 14,770.00 CD4-594 wp14 MWD+IFR2+SAG+MS 14,770.00 16,270.00 CD4-594 wp14 MWD OWSG 14,770.00 21,562.58 CD4-594 wp14 MWD+IFR2+SAG+MS 29 August, 2019 - 11:50 Page 2 of 5 COMPASS ConocoPhillips Anticollision Report for Plan: C134-594 - C134-594 wp14 Ellipse error terms are correlated across survey tool tie -on points. Calculated ellipses incorporate surface errors. Separation is the actual distance between ellipsoids. Distance Between centres is the straight line distance between wellbore centres. Clearance Factor = Distance Between Profiles / (Distance Between Profiles - Ellipse Separation). All station coordinates were calculated using the Minimum Curvature method. ConocoPhillips Alaska Inc WNS Western North Slope 29 August, 2019 - 11:50 Page 3 of 5 COMPASS ConorcoPh i I I i ps Anticollision Report for Plan: C134-594 - CD4-594 wp14 Direction and Coordinates are relative to True North Reference. Vertical Depths are relative to 19+27+1 @ 47.00usft (D141). Northing and Easting are relative to Plan: CD4-594. Coordinate System is US State Plane 1983, Alaska Zone 4. Central Meridian is-150.00°, Grid Convergence at Surface is: -0.93 °. c "2 N O O r- c O C1 co Q O U) O L u Ladder Plot 0 3500 7000 10500 14000 17500 Measured Depth (3500 usfUin) ConocoPhillips Alaska Inc_WNS Western North Slope $ CD4-03, CD4-03, CD4-03 VO - CD4-05, CD4-05, CD4-05 VO -�- CD4-289, CD4-289, CD4-289 VO $ CD4-290, CD4-290, CD4-290 VO CD4-291, CD4-291, CD4-291 VO $ CD4-291,CD4-291PB1,CD4-291PB1 VO CD4-292, CD4-292, CD4-292 VO $ CD4-298, CD4-298, CD4-298 VO $ CD4-298,CD4-298PB1,CD4-298PB1 VO $ CD4-301, CD4-301, CD4-301 VO $ CD4-301, CD4-301 A, CD4-301 A VO $ CD4-301, CD4-301 B, CD4-301 B VO $ CD4-302, CD4-302, CD4-302 V3 $ CD4-304, CD4-304, CD4-304 V6 $ CD4-304,CD4-304PB1,CD4.304PB1V16 $ CD4-306, CD4-306, CD4-306 V1 $ CD4-595, CD4-595, CD4-595 VO $ CD4-595,CD4-595PH1,CD4-595PH1 VO $ CD4-93, CD4-93, CD4-93 VO $ CD4-93, CD4-93A, CD4-93A VO -�- CD4-96, CD4-96, CD4-96 VO �E- CD4-96, CD4-96A, CD4-96A VO $ CD4-96,CD4-96APB1,CD4-96APB1 VO $ Plan: CD4-499, CD4-499, CD4-499 wp08 Vest VO - - Plan: CD4-594, CD4-594, CD4-594 VO 29 August, 2019 - 11:50 Page 4 of 5 COMPASS ConocoPh fillips Anticollision Report for Plan: CD4-594 - C134-594 wp14 Clearance Factor Plot: Measured Depth versus Separation(Clearance) Factor 1 c 0 LO (V `o U w LL c 0 7� c5 0- 0 1750 3500 5250 7000 8750 10500 12250 14000 15750 17500 19250 21000 Meesured Depth (3500 usitln) ConocoPhillips Alaska Inc_WNS Western North Slope LEGEND �� CD4-03, CD4-03, CD4-03 VO $ CD4-05, CD4-05, C134-05 VO CD4-289, CD4-289, CD4-289 VO �f CD4-290, CD4-290, C134-290 VO - CD4-291, CD4-291, CD4-291 VO $ CD4-291, CD4-291 PB1, CD4-291PB1 VO CD4-292, CD4-292, CD4-292 VO $ CD4-298, CD4-298, CD4-298 VO $ CD4-298,CD4-298PB1,CD4-298PB1 VO $ CD4-301, CD4-301, CD4-301 VO $ CD4-301, CD4-30 1 A, CD4-301AVO $ CD4-301, CD4-301 B, CD4-301 B VO $ CD4-302, CD4-302, CD4-302 V3 $ CD4-304, C134-304, CD4-304 V6 $ CD4-304,CD4-304PB1,CD4-304PB1 V16 $ CD4-306, CD4-306, CD4-306 V1 �- CD4-595, CD4-595, CD4-595 VO -� CD4-595, CD4-595PH1,CD4-595PH1 VO �r CD4-93, CD4-93, CD4-93 VO -� CD4-93, CD4-93A, CD4-93A VO -� CD4-96, CD4-96, CD4-96 VO CD4-96, CD4-96A, CD4-96A VO -0- CD4-96,CD4-96APB1,CD4-96APB1 VO $ Plan: CD4-499, CD4-499, CD4-499 wp08 WestVO �- Plan: CD4-594, CD4-594, CD4-594 VO Plan: CD4-594, CD4-594PH1, CD4-594PH1 wp13 VO 29 August, 2019 - 11.50 Page 5 of 5 COMPASS 12:14, August 29 2019 CD4-59,t4wp14 Ladder View 07 a 3 2 a 300 - - -l— ---- - - -- -- --- - i c 0 G I ro Q a� h "150 - - - — - — -- -- _. U o ' a� m Equivalent Magnetic Distance 0 10500 12000 13500 15000 16500 18000 19500 Measured Depth SURVEY PROGRAM CASING DETAILS pth From Depth To Survey/Plan Tool T D MD Nam 28.00 1600.00 CD4-594PH1 wp13 GYD-GC-SS 4061.00 14778.95 7 x 8-3/4 1600.00 2900.00 CD4-594PH1 wp13 MWD+IFR2+SAG+MS 4212.00 21562.58 4-1/2 x 6-1/8 2900.0010250.00 CD4-594PH1 wp13 MWD+IFR2+SAG+MS 10250.0010307.00 CD4-594PH1 wp13 MWD+IFR2+SAG+MS 10307.0011800.00 CD4-594 wp14 (CD4-594) MWD OWSG 10307.0014770.00 CD4-594 wp14 (CD4-594) MWD+IFR2+SAG+MS 14770.0016270.00 CD4-594 wp14 (CD4-594) MWD OWSG 14770.0021562.58 CD4-594wp14(CD4-594) MWD+IFR2+SAG+MS CO- 3 2 a 60 - --------- - - � i U � O i I (d Q i j i N 0) 1--30 _ _. __ _.. _ U o ' ! c I(D U ' - Equivalent Magnetic Distance 10350 10500 10650 10800 10950 Partial Measured Depth 16:08, August 26 2019 CD4-594 wp14 10307.00 To 21562.56 Spider well7S-pider) -04-304 (NOT a B CD4- 5 0 �M4-301 04PB1- h 1 6S Lo o u� o v> v 301 d, In �o - o -30 Ln cr 6 �S CD4 3 1 5 c Ln 5 LI 0 03 30 35 WC9 40 CD4-2 8 0 � m 4 0 5 CD4 2 44 a Z S 5 -292 289 t 4-9E 6 CD4-5 4P w 13 CD4 9 CD4-9 A g CD4-4 9 wp08 West c� tx� �S\\t`I\CD4-59 1 CD4-96 PB1 CD4- 3 Easting (3500 usft/in) 16:09, August 26 2019 CD4-594 wp14 10307.00 To 21562.58 Spider o LO CD c a 0 0 0 IN0 c r I--0 z 60 'CD4-3 2 CD4-59L# wp14 TIC View SURVEY PROGRAM SECTION DETAILS From To Tool MD Inc Azi TVD Dleg TFace Target Annotation 28.00 1600.00 GYD-GC-SS 10307.00 82.49 122.29 3453.57 0.00 0.00 KOP: 2'1100' DLS, 180°TF, for 95' 1600.00 2900.00 MWD+IFR2+SAG+MS 10402.00 80.59 122.29 3467.55 2.00 180.00 Adjust TF to 0.531, for 92.37' 2900.0010250.00 MWD+IFR2+SAG+MS 10494.37 82.44 122.30 3481.18 2.00 0.53 Hold for 3512.69' 10250.00 1 0307.00 MWD+IFR2+SAG+MS 14007.06 82.44 122.30 3943.45 0.00 0.00 Start 31/100' DLS, 101.23°TF, for 258.32' 10307.0011800.00 MWD OWSG 14265.38 81.00 130.00 3980.71 3.00 101.23 Hold for 200' 10307.0014460.00 MWD+IFR2+SAG+MS 14465.38 81.00 130.00 4012.00 0.00 0.00 Adjust TF to 0°, for 20' 14460.0015960.00 MWD OWSG 14485.38 81.00 130.00 4015.13 0.00 0.00 Start 1,5 /100' DLS, 89.9°TF, for 204.92' 14460.00 21562.58 MWD+IFR2+SAG+MS 14690.29 81.02 133.11 4047.16 1.50 89.90 Hold for 300.51' 14990.80 81.02 133.11 4094.07 0.00 0.00 Start 3'/100' DLS, 87.921 TF, for 557.67' 15548.48 82.00 150.00 4177.00 3.00 87.92 Hold for 93.41' 15641.89 82.00 150.00 4190.00 0.00 0.00 Start 2%100' DLS, 01TF, for 270.09' 15911.97 87.40 150.00 4214.93 2.00 0.00 Hold for 2738' 18649.98 87.40 150.00 4339.05 0.00 0.00 Start 21/100' DLS, 01TF, for 129,91' 18779.89 90.00 150.00 4342.00 2.00 0.00 Adjust TF to -0.1 °, for 137.27' 18917.16 92.75 150.00 4338.71 2.00 -0.10 Hold for 2645.42' 21562.58 92.75 150.00 4212.00 0.00 0.00 TD: 21562.58' MD, 4212' TVD CASING DETAILS TVD MD Name 4012.00 14465.38 7 x 8-3/4 4212.00 21562.58 4-1/2 x 6-1/8 0 270 0 10307 10307 10490 10490 10680 10680 10860 10860 _--- 11050 11050 - - - 11230 11230 11420 11420 11600 11600 12010 12010 12430 90 12430 12840 12840 -13250 13250 - 13660 13660 14070 14070 -- 14490 14490 - 14900 14900 15730 15730 -16570 16570 17400 17400 18230 18230--.----- 19070 19070 19900 19900 20730 0730 -21563 CD4-594wp14 Surface Location M CPAI Coordinate Converter From: Datum: NAD83 Region: alaska C' Latitude/Longitude Decimal Degrees t" UTM Zone: ( South r- State Plane Zone: 14 Units: us-ft (- Legal Description (NAD27 only) T o: -... . Datum: NAD27 Region: alaska C Latitude/Longitude Decimal Degrees f UTM Zone: True ii South fi State Plane Zone: 4 + Units: us ft - Legal Description (NAD27 only) r- Starting Coordinates:------------------ - - r Ending Coordinates: X 1518324.84 X: 1378291.330435862 Y: 15957300.65 Y 5957553.4871895 ! i._.__ _.... --- __-__ _ _ . __.___.. ----.- --._--- ----- ............................................................ .Transform Quit Help CD4-594wp14 Surface Location M CPA] Coordinate Converter - From: ----- -- Datum: NAD$3 Region: alaska • { Latitude/Longitude Decimal Degrees I f UTM Zone: r South i i� Skate Plane Zone: 4 Units: us ft i t Lena! Dascr ptiun fi,Cri nnjxa) Starting Coordinates: --- - — — — X: 11518324.84 y 5957300.65 — ❑ X To: - Datum: INAD27 _ Region: jalaska + f Latitude/Longitude IDecimalDegrees r UTM Zone: True South f" State Plane Zone: 4 -ijUnits: us-ft • C Legal Description (NAD27 only) Legal Description - - Township: 011 N + Range: 005 E Meridian: rU + 1 Section:19 FNL 2853.2857 FEL + 4915.6106 :........................................................... Transform Quit Help CD4-594wp14 Surface Casing M CPAI Coordinate Converter From: i Datum: NAD83 Region: alaska + r Latitude/Longitude Decimal Degrees r UTM Zone: South !+ State Plane Zone: 14 Units: us-ft r Legal Description (NAD27 only) ❑ X -To:— - — — Datum: NAD27 Region: alaska + r Latitude/Longitude IDecimalDegrees r UTM Zone: True r South i% State Plane Zone: q Units: us-ft r Legal Description (NAD27 only) - Starting Coordinates: — - Ending Coordinates: - X: 11519545 �i x 379511.478499106 Y 5956984 Y: 15957236.78308197 ...........................................:: Transform € CD4-594wp14 Surface Casing r3 CPr{I Coordinate Converter r From: ----- i ' Datum: INAD83 Region: alaska + C Latitude/Longitude DecimalDegreesi • UTM Zone: r South i- State Plane Zone: 14 Units: us ft r Legal De�cr gphon INAD2 onl;j Starting Coordinates: - X 1519545 Y: 15956984 - To: Quit Help — ❑ X Datum: NAD27 Region: alaska + Latitude/Longitude Decimal Degrees —� f" UTM Zone: True r South State Plane Zone: q Units: us ft f- Legal Description (NAD27 only) Legal Description -- Township: 011 N + Range: 005 E Meridian: JU I Section:19 FNL 3150.3198 IFEL 3691.6395 € Transform i Quit Help CD4-594wp14 Intermediate Casing _I M CPAI Coordinate Converter r From:---- f j Datum: NAD83 Region: alaska t Latitude/Longitude Decimal Degrees r UTM Zone: j�' South C� State Plane Zone: q Units: us ft i r Legal Description (NAD27 only) Starting Coordinates:--- X: 11525687 I y 15953135 — ❑ X To: -- Datum: NAD27 7, Region: alaska C Latitude/Longitude Decimal Degrees {" UTM Zone: True r South Cam` State Plane Zone: q _ Units: us-ft Legal Description (NAD27 only) Ending Coordinates: - ---- ---- -- X: 385653.330096472 Y: I 5953387.48824901 Transform Quit Help CD4-594wp14 Intermediate Casing I M CPAI Coordinate Converter From: Datum: INAD83 Region. alaska =1 r Latitude/Longitude Decimal Degrees r UTM Zone: ® F South C• State Plane Zone: 1q � Units: us-ft r Legal Description (.NAD27 only) Starting Coordinates: ❑ X Datum: NAD27 Region: alaska tr Latitude/Longitude Decimal Degrees • UTM Zone: True [_ South • State Plane Zone: Iq Units: us ft [- Legal Description (NAD27 only) — Legal X 1525687 Y 5953135 Township: 011 N _ Range: 005 fE Meridian: Section: 29 FNL - 11623.57351623.5735 FEL 2783.3975 € Transform i Quit Help CD4-594wp14 Kick-off Point M CPAI Coordinate Con•.erter From: - -- l Datum: NAD83 Region: alaska i Latitude/Longitude Decimal Degrees t UTM Zone:` !- South f+` Stake Plane Zone: q Units: us ft C Legal Description (NAD27 only) F Starting Coordinates: — --- - ----- -- f x: 11525729.68 Y: 15953107.71 CD4-594wp14 Kick-off Point M CPAI Coordinate Con•.ierter F From: Datum: NAD83 Region: alaska f' Latitude/Longitude Decimal Degrees�r r UTM Zone: j South t: State Plane Zone: q 71 Units: us ft —� C Legal Description (NAD27 only) Starting Coordinates: ---- X: 15 55729.68 Y: 15953107.71 ❑ X To: -71 Datum: NAD27 Region: alaska i` Latitude/Longitude Decimal Degrees t ` UTM Zone: True South State Plane Zone: q - Units: us-ft r Legal Description (NAD27 only) -EndingCoordinates: -- --i x: 385696.009070623 Y: 5953360.19619364 Transform Quit Help — ❑ X To: - -- ----_ — - Datum: NAD27 Region: alaska i Latitude/Longitude Decimal Degrees I UTM Zone True F South C` State Plane Zone: q Units: us-ft t: Legal Description (NAD27 only) - Legal Description Township: 011 N _ Range: 005 E Meridian: Section:', 29�299 FNL 1650.2297 IFEL 2740-3905 ...:. Transform i Quit Help CD4-594wp14 Intermediate Casing II M CP I Coordinate Converter - From; - - -- -- - — Datum: INAD83 Region: alaskar C' LatitudelLongitude Decimal Degrees • UTM Zone: South G State Plane Zone: 14 Units: us ft r Legal Description (NAD27 only) Starting Coordinates: --- — — X: l 229150.01 Y: 15950814.5 To: --- Datum: NA527 - Region: alaska !" Latitude/Longitude IDecimalDegrees i' UTM Zone: True r South fi State Plane Zone: q Units: us-ft C Legal Description (NAD27 only) Ending Coordinates: X: 389116.253899259 Y: 5951066.82037342 :.........................................................:. .Transform ) Quit Help CD4-594wp14 Intermediate Casing II M CRAI Coordinate Converter — ❑ X From: Datum: NAD83 - Region: alaska _ r Latitude/Longitude Decimal Degrees _ r UTM Zone: �� f- South f+ State Plane Zone: q Units: us-ft Ir' Legal Description (N,AD27 only) Starting Coordinates: X: 11529150.01 Y: 15950814.5� To: - - - -- -- - - - Datum: INAD27 _ Region: alaska t Latitude/Longitude Decimal Degrees r UTM Zone: True F- South r State Plane Zone: 14 Units: us ft r: Legal Description (NAD27 only) Legal Description Township: Olt N - Range: 005 E Meridian: Section: 28 FNL 3892.3497 FEL 4572.5049 Transform ) Quit Help CD4-594wp14 Production - Top Narwhal Central M CPAI Coordinate Converter — ❑ X F- From: Datum: NAD83 Region: alaska I _ r Latitude/Longitude Decimal Degrees i UTM Zone: f- South +: State Plane Zone: q - Units: us ft r Legal Description (NAD27 only) Starting Coordinates: X: 11529445 Y: 15950538 ------------------ To:— Datum: NAD27 Region: alaska {" Latitude/Longitude Decimal Degrees��� UTM Zone: True r- South State Plane Zone: q Units: us ft r Legal Description (NAD27 only) Ending Coordinates: X: 389411.233560949 Y: 5950790.30528782 Transform i Quit Help CD4-594wp14_ Production - Top Narwhal Central M CPAI Coordinate Converter — ❑ X From:._..�---- Datum: NAD83 Region: alaska f Latitude/Longitude Decimal Degrees r� C` UTM Zone: — r South t:' Stake Plane Zone: q Units: us ft t Leval Description (NAD27 only) Starting Coordinates: To: ---- - Datum: JUD27 Region alaska LatitudelLongitudeDecimal Degrees t UTM Zone: True r South r State Plane Zone: q Units: us-ft C- Legal Description (NAD27 only) Legal Description — — X: 1529445 Township: 011 N , Range: p05 E T Y: 15950538 Meridian:` Section: 28 —.� _.. FNL 4164.5106 FEL . 4274.1921 Transform Quit Help CD4-594wp14 TD 1. CPA] Coordinate Converter -From: - --_ - -- Datum: NAD83 Region: alaska r Latitude/Longitude IDecimalDegrees r UTM Zone: 9 — j" South to State Plane Zone: 4 Units: us ft • r Legal Description (NAD27 only) ❑ X To: Datum: INAD27 Region: Jalaska 11 i" Latitude/Longitude IDecimalDegrees r UTM Zone: True r South 0- State Plane Zone: 4 , Units: us-ft Legal Description (NAD27 only) Starting Coordinates: Ending Coordinates: X: 11532780.07 X: 392746.092684265 Y 5944773.79 Y: 15945025.91996624 CD4-594wp14 TD M CPAI Coordinate Converter Datum: INAD83 j Region: alaska r Latitude/Longitude Decimal Degrees l UTM Zone: �� j- South G Stake Plane Zone: 4 Units: us-ft t Legal Description (NAD27 only) Starting Coordinates: X: 11532780.07 Y: 15944773.79 ®r� Transform Quit Help — ❑ X To: — Datum: NAD27 _ Region: alaska , Latitude/Longitude Decimal Degrees r UTM Zane: True South r State Plane Zone: 4 _TJUnits: us ft r Legal Description (NAD27 only) Legal Description - — Township: 011 N _ Range: 005 E • Meridian: U - Section:33 FNL 4600.5392 FEL 869.96982 ................................................ Transform Quit Help 1 9 I3/31/14 I AG I DB I C.A, I UPDATED PER K140003ACS 110I4/28/14 1 AG I DB I C.A]UPDATED PER K140003ACSI CONDUCTORS CD4-X97 THRU CD4---X28 ARE LOCATED IN PROTRACTED SEC. 24, T 11 N, R 4 E, U.M. CONDUCTOR CD4-X96 IS LOCATED IN PROTRACTED SEC, 19, T 11 N, R S E, U.M. SEC.LINE C/S EXIST. WELL 'Y' X' LAT.(N) LONG.(W) FSL FEL GND PAD CD4-X86 5,957 337.85 1 518,480.27 70' 17 32.458 150' 59 14.133 2466 18.9 CD4-287 5,957,333.22 1,518,460.78 70' 17 32.409 150' 59 14.699 2461 19.1 C04 X88 595 328.53 1 518,441.29 70' 17 32.360 150' S9 15.265 2456 M4799' 18.9 C04-18 5 57 23.89 1 1 421, p' 1 11 1 0' S9 f 451 19.0 CD4-190 5957 319.25 1 518 402.44 70' 17 32.262 150' 59 16.393 2446 19.0 CD4-191 5,957314.54 1518,382.87 70' 17 32,213" 150' 59 16.961 2441' . 1&9 CD4-292 5 957 310.03 1 518 363.49 70' 17 32.165 150' 59 17.524 2436 4877 114 18.8 4-X93 15.957,305.151 518 344.09 70' 17 32.114 ' 59 18.087" 2431' 4896 12.4 19.0 CD4-X94 5.957 300.65 1 51 B 324.84 70' 17 32.067 150' 59 18.645 2426 4915 12.4 19.0 CD4-X95 5,957 29 .77 1 518 305.33 70' 17 32.016 1501 .2 2 42 4935 124 19.0 C04-X96 5,957 291.25 1 518,286.46 70' 17' 31.968 150' S9 19.760'0 2416 4953 12.4 18.9 C04-X97 5,957,286.78 1 518 256.76 70' 1 31.921 150' 59 20.331 2412 12 12.4 18.8 C04--X98 5,957,282.22 1,518,247.43 70' 17 31.873 150' 59 20.893 2407 31 12.4 19.7 CD4-X99 5,957 277.98 1,518,227.75 70' 17 31.828 150' 59' 21.464 2402 51 12.4 19.0 CD4-3018 5,957 27 .28 1,518,208,24 70' 17 31. 79 1 0` 59 22.030 2397 70 12.4 19.0 C04-3C2 5,957,268.38 1 518 188.64 70' 17 31.728 150' 59 22,599 2392 90 12.4 19.6 CD4-303 5,957,263.99 1.518,169.26 70' 17 31.681 150 59 23.162 2387 109 12.4 19.6 CD 304 2 9.26 1 518149. 0' 1 1.632 150' 59 23. 238 128 1 19. CD4-05 5,957 254.43 1,5119,130.28 70' 17 31.581 150' 59 24.293 2377 148 12.4 19.5 C04- 06 5.95 249. 6 1.518.110.87 70' 17 31.532 150' 59 4.857 2372 167 12.4 19.5 CD4-07 5. 957 245.29 1 518 091_49 70 17 31.485 150' 59 25.419 2367 186 12.4 19.7 CD4-208 5,957,240.13 1,518071.80 70' 17 31.431 150' 59 25.991 2362 206 12.4 19.8 CD4-209 5,957,235.77 1 5T8 052.15 70` 17 31.385" 150' 59 26.561 2357 226 12,4 19.7 C04-210 5 957 230.92 1,515.032.98 70' 17 31.334 150' 59 27.118 2352 245 12.4 19.6 C04-211 5,957 226.94 1,518.013.75 70' 17 31.292 150' 59 27.676 2348 264 12.4 20.0 CD4-212 5 957 222.25 1,517.994.40 70' 17 31.243 150` 9 28.238 2343 283 12.4 19.6 CD4--2f3 5,957 217.19 1 517,974.60 70' 17' 31.190" 150' 59' 28.812" 2337' 303 12.4 19.9 CD4-214 5.957 212.46 1,517.955.51 70' 17 31.140 150' 59 29.3 77 2332 322 12.4 19.8 CD4-215 5.957 208.07 1 517,935.87 70' 17 31.094 150" 59 29.937 2327 341 12.4 19.8 C04-16 5,957,203.17 1,517,916.63 70' 17 31.043 150' 59 30.495' 2322 361 12.4 19.5 CD4-17 957 198.80 1,517,897.14 70' 17 3, , 9Z 1 0' 59 3 .06 2318 380 12.4 19.5 CD4-318A 5,957,193.71 1,517.877.38 70' 17 30.944 150' 59 31.634 2312 400 12.4 19.6 CD4-319 5.957 189.64 1 517.857,90 70' 17 30.900 150' 59 32200 2308 419 12.4 19.7 C 4-3 0 i8 .0 1,517,838.65 0' t 0.8 2 1 9 7 2303 4 12.4 19. CD4-321 5,957,180.22 1 517,819.26 70' 17 30,802 150' 59 33.322 2298 458 12.4 19.0 C04-3221 5.957 175.24 1. 5 7 799. 0 70' 17 30.74 150' 59 33.884 2292 477 12.4 1 .0 CD4-X23 5.95 170.76 1, 517 780.38 70' 1 30.702 150' 59 34.450 2288 496 12.4 19.0 C04-X24 5,957166.23 1 517,760.82 70' 17 30.655 150' 59 35.018 2283 516 12.4 19.0 4- 9 1_ 4 1,517,741.31 0 .603 150- 9 84 2 12.4 19.0 CD4-X26 5,957,157.10 1,517,721.97 7D' 17 30.558 150` 59' 36.146" 2273' 554 12.4 19.5 C04-227 5,957151.94 1 517,702.56 70' 17' 30.505" 150' 59' 36.709" 2268' 574' 12.4 19.6 C04-X27 .95 ,150. 1 51 ,69 . 70' 17 30.492 '59 6.86q 2 6- 5 9 12.4 --17-.4 CD4-X28 ,14 .24 1,517,578.39 70' 17 .445 150" 59 .411 2 61 59812.4 --T. 8 NOTES; 0A)pTno KUUKPIK 1. COORDINATES SHOWN HEREON ARE ALASKA STATE PLANE, ZONE 4, NAD 83.2. ELEVATIONS SHOWN ARE BRITISH PETROLEUM MEAN SEA LEVEL (B.P.M.S.L.) Survey Office ALPINE MOOULE: CD40 UNIT: CD ConocoPhilli 5 ALPINE PROJECT CO-4 WELL CONDUCTORS Alaska, Inc. AS -BUILT LOCATIONS CADD FILE N0, DRAWING NG: PART: REV: 05-03-03-1B-2 10 11 05 CE-CD40-121 2 OF 3 10 CD4-594 Drilling Hazards Summary 16" Hole / 13-3/8" Casinp_ Interval Hazard Risk Level Mitigation Strategy Conductor Broach Low Monitor cellar continuously during interval. Gas Hydrates Low Monitor well at base of permafrost, controlled drilling rates, low mud temperatures. Additions of Lecithin. Monitor real time equivalent circulating density (ECD) to Lost Circulation Low below expected formation fracture gradient. Prepare enough lost circulation material on location. Reduce drilling ROP and trip seed when necessary. Hole swabbing on trips Moderate Reduce tripping speed, lower mud rheology, pump out of hole if necessary. Monitor real time surveys closely, run gyro survey to Anti -Collision Low eliminate magnetic interference from nearby wells when needed. Washouts / Hole Sloughing Moderate Keep mud temperatures as low as possible, minimize circulating time when possible. 12-1/4" Hole / 9-5/8" Liner Interval Hazard Risk Level Mitigation Strategy Stuck Pipe Low Keep good hole cleaning practices, monitor ECD and torque/drag real time. Monitor pit volumes while drilling and tripping, flow Abnormal Reservoir Pressure Low check on con r� ns. Shallow hazard analysis performed and sugges5 low isk of abnormal pressure. Monitor E o below expected formation fracture Lost Circulation Low gradient. Prepare enough lost circulation material on location. Reduce drilling ROP and trip speed when necessary. Hole swabbing on trips Moderate Reduce tripping speed, lower mud rheology, pump out of hole if necessary. 8-3/4" Pilot Hole Interval Hazard Risk Level I Mitigation Strategy Stuck Pipe Low Keep good hole cleaning practices, monitor ECD and torque/drag real time. Monitor pit volumes while drilling and tripping, flow Abnormal Reservoir Pressure Low check on connections. Shallow hazard analysis performed and suggests low risk of abnormal pressure. Narwhal Sand PP expected to be 8.9 Monitor real time equivalent circulating density (ECD) to Lost Circulation Moderate below expected formation fracture gradient. Prepare enough lost circulation material on location. Reduce drilling ROP and trip seed when necessary. Hole swabbing on trips Moderate Reduce tripping speed, lower mud rheology, pump out of hole if necessary. 8-3/4" Hole / 7" Liner w/ Tieback Interval Hazard Risk Level Mitigation Strategy Stuck Pipe Low Keep good hole cleaning practices, monitor ECD and torque/drag real time. Monitor pit volumes while drilling and tripping, flow Abnormal Reservoir Pressure Low • check on connections. Shallow hazard analysis performed and suggests low risk of abnormal pressure. Narwhal Sand PP expected to be 8.9 Monitor real time equivalent circulating density (ECD) to Lost Circulation Moderate. below expected formation fracture gradient. Prepare enough lost circulation material on location. Reduce drilling ROP and trip seed when necessary. Hole swabbing on trips Moderate Reduce tripping speed, lower mud rheology, pump out of hole if necessary. 6-1/8" Open Hole / 4-1/2" Liner Interval Hazard Risk Level I Mitigation Strategy Monitor pit volumes while drilling and tripping, flow Abnormal Reservoir Pressure Low ' check on connections. Shallow hazard analysis performed and suggests low risk of abnormal pressure. Narwhal Sand PP expected to be 8.9 ppg.' Stuck Pipe Low Keep good hole cleaning practices, use PWD tools monitoring and analysis, stabilized BHA. Lost Circulation Moderate Reduced pump rates, mud rheology, use LCM program, control ECD below expected fracture gradient. Differential Sticking Low Follow mud program, keep pipe moving when able. Getting Liner to bottom Moderate Monitor T&D real time for early signs of issues, properly clean hole prior to pulling out of hole to run liner. Hole swabbing on trips Moderate Use proper tripping speed, monitor proper hole fill (use of trip sheets), pumping backreaming out if necessary. WELL: CD4-594 SECTION: 13-3/8" SURFACE Excess below Permafrost: 1.5 Excess in Permafrost: 3.5 Lead cement yield 1.92 Eft30/%! Tail cement yield 1.16 Design: 500' of 15.8ppg Tail Cmt with 11.0ppg Lead Cmt to surface with 50% excess below Permafrost & 250% excess in Permafrost CAPACITIES ANNULARS 20"CON Dx 13.375"= 0.1862 BBL/FT 16" OH x 13.375"=I 0.0749 BBL/FT INTERNAL Nominal 13.375"68#= 0.1497 BBL/FT DEPTHS PREVIOUS SHOE 108 FT TOPOFFLOATCOLLAR 2831 FT SETDEPTH 2911 FT LENGTHOFTAIL 500 FT BASE O F PE RMAFROST 1257 FT LENGTH OF LEAD 2411 FT VOLUMES TAIL CEMENT SHOE TRACK 8ol FT% 1 0.1497 BBL/FT= 12.0 BBL5 16" OH x 13.375"CSG 500 FT 0.0749 BBL/FT= 37.5 BBLS 37.5 BBLSX 1.5 50% 56.2 BBL5 TOTAL VOLUME - TAIL CMT br.2 BBLS LEAD CEM ENT 16" ON x 13.375" CSG -Below Permafrost 1154 Fr 0.0749 BBL/FT= 86.4 BBLS 86.4 BBLSX 1 1.5 50% 1 129.7 BBL5 16" OHx 13.375" CSG- In Permafrost 1149 FTX 0.0749 BSL/FT= 86.1 BBLS 86.1 BBLSX 1 3.5 250% 1 301.2 1 BBLS 20" COND x 13.37S" CSG 1081 FT I 0.1862 BBL/FT= 20.1 BBLS TOTAL VOLUME -LEAD tWr 451.0 1 BBLS DISPLACEMENT To Top o Float Collor 2631 FTX 0.1497 BBL/FT= 423.9 BBLS 13-3/8" SURFACE CEMENT CALCULATIONS Design: 500' of 15.Bppg Tail Cmt with 11.0ppg Lead Cmt to surface with 509/ excess below Permafrost & 250%excess in Permafrost Tail Cement yield = 1.16 ft^3/sk I Lead Cement yield = 1.92 k^3/sk 11.0 ppg DeepCRETE Lead Slurry CONDUCTOR= 108'x 0.1862 bbl/ft x 1.0 0%excess 20.1 bbls Base of Permafrost to COND = (1257' -108') x 0.0749 bbl/ft x 3.5 (250%excess) 301.2 bbls Btm of Lead to Base of Permafrost - (2411'-1257') x 0.0749 bbl/ft x 1.5 (50%excess) 129.7 bbls Total Lead Cement = 451 bbls I or 12532.3 W3 1 or 1319 sks 15.8 ppg Class G Tail Slurry Shoetrack = 80' x 0.1497 bbl/ft x 1.0 (0%excess) 12.01bbls Shoe to To of Tail = 2911' - 2411') x 0.0749 bbl/ft x 1.5 50•9/ excess 56.2 bbls Total Tail Cement= 68.2 hbls 382.7 tt^3 or 330 sks Displacement= (2911'- 80') x 0.1497 bbl/ft= 423.9 bbls WELL: CD4-594 SECTION: 9-5/8" INT I Excess planned: 1.4 40% Cement yield 1.16 1 ft^3/sk Design: Class G 15.8 ppg Cement to 250' TVD above shoe set depth. CAPACITIES ANNUTARS 13-3/8" CSG x 9-5/8" CSG = 0.0597 BBL/IT 13-3/8" CSG x 5-7/8" DP = 0.1162 BBL FT 12-1/4" OH x 9-5/8" CSG = 0.0558 BBL/FT INTERNAL Nominal /8"26.3!DSGP= 0.0235 BBL/FT Nominal9 5/8" 400 C= 0.0758 BBL/FT DEPTHS PREVIOUS SHOE = 2911 FT TOP9-5/8"LINER = 2761 FT FLOATCOLLAR= 10137 FT PT SET DEH = 10257 FT FILLOF CEMENT= 1912 FT Desired TOC -I 8345 FT VOLUMES SHOE TRACK 1201 FTX I 0.0758 BBL/FT= 1 9.1 BBLS 12.25" OH x 9.625" CSG 1912 FT% 0.0558 BBL/FT= 106.7 BBLS 106.7 BOLS X 1.4 4011 149.3 BBLS I To To o To Liner Han er 2761 FTX 0.0235 BBL/FT= 1 64.91 BBLS Liner Han er To o Float Collar 7376 FT X 0.0758 BBL/FT= 9 1 559.3 1 BBLS 9-5/8" Intermediate I Cement Calculations Design: Class G 15.8 ppg Cement to 250' TVD above shoe set depth. Cement yield= 1.16ft-3/sk Planned TOC= 8345'MD Shoe Track 120' x 0.0758 bbl/ft x 1.0 0%excess 9.1 bbis 12-1/4" x 9-5/8" Annulus = (10257' - 8345') x 0.0558 bbi/ft x 1.4 (40Yo excess) 149.3 bbis Total Cement Volume = 158.4 bbis I or 889.4 W3 1 or 767 sks Displacement= (10137' - 2761') x 0.0758 bbl/ft+ 2761' x 0.0235 bbl/ft= 624.2 1 bbls WELL: CD4-594 SECTION: PILOT Excess planned: �1.16ft,3/,k Lead Cement yield Design: Run 3-1/2" EUE sacrificial tubing string and cement in place with 15.8ppg Class G cement to 1500' MD above top of K3. CAPACITIES ANNULARS 13-3/8"CSG x4"DP= 1 0.1342 BBL/FT 8-3/4" OH x 4" DP = 0.0588 BBL/FT 8-3/4" OH x 3-1/2" Tubing= 0.0625 BBL/FT INTERNAL Nominal 4" 14# DP = 0.0108 'IL/ET Nominal 3-1/2"9.2#Tubing = 0.0087 BBL/FT DEPTHS Previous Shoe = 102S71 FT To 9-5/8"LINER = 2761 FT Set Depth = 15100 FT Length of Cement = 3264 FT Desired TOC= 11836 FF VOLUMES 8.75" OH x 3-1 2" Tubin 3264 EX 0.0625 BBL/FT= 203.9 BBLS 203.9 BBLSX 1.3 30% 265.1 BBLS 3-112"Tubing 3264 FIX 0.0087 BBL/FT= 28.4 BBLS 28.41 BBLSX I 1 0% To Top of Top 3-112" Tubing 28.4 BBIS 118361 FT 0.0108 BBL FT= 128.3 BBLS 13 3/8" SURF 8-3/4" OH Abandonment Cement Calculations Design: Run 3-1/2" EUE sacrificial tubing string and cement in place with 15.8ppg Class G cement to 1500' MD above top of K3. Lead Cement yield = I 1.16 ft-3/sk 15.8 ppg Class G Tail Slurry 8-3/4" x 3-1/2" Annulus= 15100'-11836' x 0.0625 bbl/ft x 1.3 30%excess 265.1 bbls 3-1/2" Tubing = (15100' - 11836') x 0.0087 bbl/ft x 1 (0%excess) 28.4 bbls Total Lead Cement = 293.5 bbls 1 or 1647.8 W3 1 or 1421 sks Displacement = (11836' - 15100') x 0.0308 bbl/ft = 129.3 bbls WELL: CD4-594 SECTION: 7" INT II Excess planned: 1.4 40% Lead Cement yield 1.96 ft^3/sk 7a-TCernerifyield 1.1b ft^3/sk Design: 500' 15.8 ppg class G tail with 13 ppg extended tail to 1500' MD above K3 marker. CAPACITIES ANNULARS 13-3/8" CSG x 4" DP = 0.1342 BBL/FT 9-5/8" CSG zWE" DP= 0.0603 BBL/FT 9 CSG z 7" SG = 0.0282 BBL/FT 0.0268 BBL/FT INTERNAL Nominal 4"14#DIP = 0.0108 BBL/FT Nominal 7"26#CSG= 0.0383 BBL/FT DEPTHS PREVIOUS SHOE = 10257 FT TOP 9-5/8"LINER= 2761 FT TOP 7" LINER 10107 FT FLOAT COLLAR = 14659 FT SET DEPTH = 14779 FT LENGTH OF TAIL = 500 FT LENGTH OF LEAD = 2628 FT Desired TOC= 11651 FT VOLUMES LEAD CEMENT 8.75" OH x 7" CSG 2628 FT 0.0268 BBL/FT= 1 70.4 BBLS 70.4 BBL5X 1.4 40% 1 98.5 BBLS SHOE TRACK 1201 FT 1 0.0383 BBL/FT= 1 4.6 BBLS 8.75" OH x 7" CSG 500 FTX 0.0268 BBL/FT= 13.4 BBLS 13.41 BBLSX 1 1.4 40% 1 18.7 BBLS To To o T Ciner Hon er 10107 FTX 0.0108 BBL/FT=1 109.5 BBLS Liner Han er To To o Floot Collar 4512 FT 0.0383 BBL/FT= 174.2 BBLS 13 3/8" SURF 7" Intermediate II Cement Calculations Design: 500' 15.8 ppg class G tail with 13 ppg extended tail to 1500' MD above K3 marker. Tail Cement yield = 1.16 1 ft^3/sk Lead Cement yield= 1.96 k^3/sk 13 ppg Extended Lead Slurry 8-3/4"x7"Annulus= 14779'-11651'-500' x0.0268 1bl/ftx1.4 40%excess 98.5 bbls Total Lead Cement = 98.5 bbls I or553.1 ft^3 282 sks 15.8 ppg Class G Tail Slurry Shoetrack= 120'x 0.0383 bb1/ft x 1.0 0%excess 4.6 bbls Shoe to Top of Tail = I 500' x 0.0268 bbl/ft z 1.4 (40%excess( 18.7 bbls Total Tail Cement = 23.3 bbls 1 or 1131 ft^3 1 or 113 sks Displacement= (14659'-10107')x0.0383 bbl/ft+ 10107'x 0.0108 bbl/ft= 283.7 bhls ■ The location of the CD4-594 wellpath is close in proximity to the recently drilled CD4-595 well. The previously conducted Shallow Hazard and Pore Pressure Study for CD4-595 combined with extensive drilling experience on CD4 pad suggests that no abnormally geo-pressured strata will be encountered. ° There will not be a dedicated 3rd party PP/FG analysis performed on this well. Eq...1 nt M.aw ght mPP9)..1Cu ted fl—KB TVDmI 6,0 7.0 9.0 9.0 10 11 u 13 14 18 16 17 18 19 .� 200{ 200 4001 Prognosed : 4W `~-., �■� 600� Tops 6M ;. 800 BDO Use Permafrost— -- ------- 1200 1200 1400 1400 ... ; ... 1800k10 -�- E 2000 j : E 2600 2200 10 2 Sand--.. y__ ..,; ,. 2400C9 sand 2400. ... �1 2600z0 2eo9 2800 2800. 3000 3000' 3200 3200i 3400� 3400 3600.1 3600- .. ... . 3800 __-- 4000420i0 �TVDSS— � 28 August 29, 2019 CONFIDENTIAL e e ,e . Redacted M. Guhl 1/19/2022 CD4-594PH1 Grass Roots "Narwhal Left of Lefty" Sand Pilot Hole Proposed Wellbore Schematic (Pilot) (WP13) DrilPlex 10 PPG !-SND WBM 11 PPG LSND WBM 9.2 PPG 11 PPG w/ MPD K-3 Sand Top: 13,336' MD / 3,844' TVD Narwhal Central Sand Top: 13,755' MD / 4,075' TVD Narwhal Lefty Sand Top: 13,873' MD / 4,143' TVD ConocoPhillips Last Update: 8/28/19 - AJD Conductor Installed: 20" (Insulated) set @+/-105' 16" Surface Hole 9 5/8" x 13 3/8" Liner hanger: 2,761' MD' Surface Casing: 13-3/8" 68# L-80 TXPM 2,911' MD / 2,397' TVD 12-1/4" Intermediate 1 Hole TOC @-8,345' MD / 3,197' TVD Top KOP @ ± 10,057' M D Intermediate 1: 9 5/8" 40#, L80, TXPM @ ± 10,257' MD / 3,447' TVD Sacrificial String Disconnect Tool w/ 3-'/:" HYD563 tubing tail TOC @ ± 11,836' MD (1,500' MD Above Top K-3) Pilot Hole TD: ± 15,300' MD / 4,847' TVD @ 55 deg 8-3/4" Pilot Hole Doyon 141 Well Control Equipment and Schematics UTLL +C OTNUROL EQUIPMENT BOPEgme vtenf • I ea. — Hydril annular di-uerter BOP, 21 '/." x 20N psi • 1 ea. - Hydril annular BOP with nitrile element, model GK 13 547 x 5000 psi, flanged, NACE trim. • 3 ea- - Hydril single gate, model WL,13 5/8 x 5000 psi, flanged, NACE trite with 10" operators. BOP Rams for 13 54' x 5tut • I - sex of H� dril blind rams. • I - set of Hydril 2 TV' rams. • I - set of Hydril 3 I IT' rams. • 2 - sets of Hydril 5" rams. I -set of Hydril ?"-rams. • 'variable or other rams shall be provided per contractual agreement Spools and Fishes • I ea. - mud cross,13 5)T' x 13 518" x 50M psi with two ea.- 3 V8 x 5000 psi side outlets. MACE trim. • I ea. - adapter spool, 13 518" x I I" x 5000 psi, NACE trim_ • 2 ea. - 3 1t8" x 5000 psi, hydraulically operated ( choke and kill HCR ) gate i aies, IN ACE true • 2 ea. - 3 1,18" x 50t?0 psi manual vahes , NACE trim 1 m - divester spool: 20 V4" x 201+4" x 2000 psi. udth one ea. 15" ,150 psi outlet for knife gate vilve I ea. - adapter spool, 20 DW x W x 2000 psi e drake mawfou • lea. - 2.1t15" x 50M psi, manual gate valve. IvACE trim • 12 ea. - 3 118" x 5000 psi, manual gate. valves, MACE trim • 1 ea. - 3 LT"' x 5000 psi, manual choke • ea. - 3 1t8" x 10,000 psi., remote operated hydraulic choke • All ,-alves have K A.CE trios and color coded handless far sequencing. • The remote choke control panel is located on the drill floor BOP C105urg Unit • lea. - Koomey, Type 80, G station, 3000 psi,18€} gallon accttiirttlafor unit. • Primary closing hydraulics is provided by an electrically ddi en triplex pump. Secondar, back.=tap is a 30:1 air pump, and emergency pressure is provided by bottled nitrogen • The remote closing operator panels are located in the doghouse, and on the a•.=ula or uuut. BOP Test Fujinp a 1 ea. - triplex ptunp capable of 5,DDQ psi with 30 gallon dedicated test fluid tank. • 1 ea.. - two pin, chart recorder for BOP tests Driffstring Valves • lea. - Hydril 10;04D psi. , 4112 IF upper kelly cock • 2 ea. - Hydri110_flDO psi.. 41i2 IF lower kellj cooks • 1 ea. - Hy driL 10,000 psi , 41 /2 IF, MOP valise 1/24/12 D OYO N 141 B O P 'S DRILLING 13-5/8 5000 PSI RIG FLOOR HYDRIL 7 "GK" 50( STUD z : HYDRA. 1 13-5/8" FLANGE 10" OPEI PIPE RA1 14" OPEI SHEAR R HYDREL 1 13-5/8" STUD z ! 10" OPEI PIPE RA1 vAIVL ([GEND I ItU i nAan wisxa'n um p�� 5 D_rtl P.Vb w.avee� mr� --.—.�.—.—.�..—.—.�— � 1tL1C11kY. ttPE-80, iaa CAL 6 SmtilXl a i0v PEVE W45 :'�ki°tOr � [�, hl SW.FiW ] ANY�kki o 0 a .rnAn9unY wDsmn ° 20 WrRZ. )i GKLM* EACH C o 0 o I a'lY srA°c a I I YEWiF PAhfl. M OGGM0.-. YmD um:xr eras wow.e..e ... � DDm9rre eAcam aornn 6 001EIF5. 2r N. R., O ]OW P5 GrocAGf OrvS.: aSL't�BAi4N _L.. „�ir,.�., �, I AIO mN�a101. Maeat Ge 6� 3T�iF Ykin+T i WYeF eYp:F WAet T e 17 4 z seo 147 ol Y t nu. u[ w R.ta 1Ae -- a :ir w.0 i--rd�fg nm r� J I t.b 1 tt ,t Y I eJ i e.t :e°M.m m i tr ®us m w.o t i 9 x i It � 6. 11: asD f ].2 .9{ i2a aae i]3 .W 1 OAS OV Ep_cYAApI �w to MATERIAL LIST em Descrl o Q 7.1f1b" 1laN TRIFLOW Remote OFereSed dreuie Choke 3dlS SM TypeH2A*xtebfeCldm 1 2-1116" SM Manuel Cate Valve 2-14 3.1w 5M Manual cafe VeNe RIG 141 LEDGEND WhIte Handle Valves Normally Open Red Handle Valves tv Normally Closed Date: 11-27-01 Rev. 1 155.26 mm 29.12 0 0 14112 REDUCER BUSHING ASSY 3 I/2 % 7 83-160-353 CSG HGR ASSY,SPCL C-24 13 1/8 X 7 24163 P139105-0003 26.86 CSG HGR C-21, 18 3/4 X 13 3/8 12-093-177 LANDING RING, 20 SOW BTM PREP X 19.995 OD SLICK NECK TOP 1/16-5K TREECAP 4 I/16-5K MOD 120 GV ACTD 1/16-5K MOD 120 GV ACTD 4 1/16-5K MOD 120 GV ACTO 4 1/16-5K MOD 120 GV ACTD 9 1/16-5K MOD 120 GV ADAPTER,A-4-M, 13 5/8-5K STDD BTM X 4/16-SK STDD TOP P 1000087916 TUBING HANGER, TC-IA-EMS, 13 5/8 X 4 1/2 P1000087918 CASING SPOOL ,C-29-ET, 13 5/8-5K STDD BTM X 13 5/8-5K FLG TOP 13-300-629 2 I/16-5K MOD 120 GV 12-160-025 CSG HD, C-29-ET, 13 5/8-SK (BX-1601 LFG TOP 13-260-696 CSC HGR MANDREL, 13 3/8 X 7 P1000096009 �-2 1/16-5K MOD 120 GV CSG HGR MANDREL 18.50 OD X 13 3/8 BC BTM 13.79 12-130-444 LANDING RING, 20 SOW BTM PREP X 19.995 OD SLICK NECK TOP 13-300-030 I �20 OD CASING 13 3/8 OD CASING 7 OD CASING 4 I/2 00 TUBING EXPLORATION BIG BORE SYSTEM ... 20 X 13 3/8 X 7 X 4 1/2 oemonss's PRIVATE AND CONFIDENTIAL DESCRIPTION +u 0. 611I 06-2D-16 xc "I" E� � MhnIpFMC SURFACE WELLHEAD LAYOUT Tz. MAROUEz 06-zo-16 UNIHEAD, UH-I, LANDING RING, REviExE� E sae CONOCOPHILLIPS, EXPLORATION s 0.':CHARDS 06-08_18 s NA BIG BORE SYSTEM, ALASKA — E, x WAABER 1305210AllEv B vEG. SCOTT 0s-06-16 +DM100242449 1n TRANSMITTAL LETTER CHECKLIST WELL NAME: PTD: i Development Service Exploratory _ Stratigraphic Test _ Non -Conventional //— FIELD: dk4 e >y`P�� POOL: / i' Check Box for Appropriate Letter / Paragraphs to be Included in Transmittal Letter CHECK OPTIONS TEXT FOR APPROVAL LETTER MULTI The permit is for a new wellbore segment of existing well Permit LATERAL No. , API No. 50- - - - (If last two digits Production should continue to be reported as a function of the original in API number are API number stated above. between 60-69 In accordance with 20 AAC 25.005(f), all records, data and logs acquired for the pilot hole must be clearly differentiated in both well Pilot Hole name ( PH) and API number (50- - - -� from records, data and logs acquired for well name on permit). The permit is approved subject to full compliance with 20 AAC 25.055. Approval to produce/inject is contingent upon issuance of a conservation Spacing Exception order approving a spacing exception. (Company Name) Operator assumes the liability of any protest to the spacing exception that may occur. All dry ditch sample sets submitted to the AOGCC must be in no greater Dry Ditch Sample than 30' sample intervals from below the permafrost or from where samples are first caught and 10' sample intervals through target zones. Please note the following special condition of this permit: production or production testing of coal bed methane is not allowed for Non -Conventional (name of well) until after (Company Name) has designed and Well implemented a water well testing program to provide baseline data on water quality and quantity. (Company Name) must contact the AOGCC to obtain advance approval of such water well testing program. Regulation 20 AAC 25.071(a) authorizes the AOGCC to specify types of well logs to be run. In addition to the well logging program proposed by (Company Name) in the attached application, the following well logs are also required for this well: Well Logging Requirements Per Statute AS 31.05.030(d)(2)(B) and Regulation 20 AAC 25.071, U composite curves for well logs run must be submitted to the AOGCC within 90 days after completion, suspension or abandonment of this well. Revised 2/2015 WELL PERMIT CHECKLIST Field & Pool Well Name: COLVILLE RIV UNIT CD4-594 _—Program EXP Well bore seg ❑ PTD#: 2191150 Company ConocoPhillps Alaska,lnc. — _ Initial Class/Type EXP / PEND GeoArea 890 Unit 50360 On/Off Shore On - Annular Disposal ❑ Administration 1 Permit fee attached NA 2 Lease number appropriate Yes Surface location in ADL 384211, well passes thru ADL 300082, 3 Unique well name and number Yes top prod interval in ADL 380081, TD_in ADL 391587, 4 Well located in a defined pool No Exploratory injection well. 5 Well located proper distance from drilling unit boundary No SPACING EXCEPTION NEEDED: hearing set for Oct 1,_2019. 6 Well located proper distance from other wells Yes 7 Sufficient acreage available in drilling unit- - Yes '8 If deviated, is wellbore plat included Yes -------------- 19 Operator only affected party Yes 10 Operator has appropriate_ bond in force Yes - 11 Permit can be issued without conservation order No { SPACING EXCEPTION NEEDED: hearing -set for Oct 1,-2.019. - f--° G v. _ ✓ c-, `t �.� Appr Date 12 Permit can be issued without administrative approval Yes I . 13 Can permit be approved before 15-day wait Yes SFD 9/4/2019 14 Well located within area and strata authorized by Injection Order # (put_ 10# in comments) (For No New pool (Narwhal), injection order needed. 15 All wells within 1/4_mile area of review identified (For service well only) Yes None_ ----------------- 16 Pre -produced injector: duration of pre production less than 3 months (For service well only) No 17 Nonconven. gas conforms to AS31.05.0300.1.A),0,2_.A-D) NA 18 Conductor string provided Yes 20" conductor set at 105' Engineering 19 Surface casing protects all known USDWs NA no aquifers in area. 20 CMT vol adequate to circulate on conductor & surf csg Yes 21 CMT vol adequate to tie-in long string to surf csg No 22 CMT will cover all known productive horizons Yes 7" int liner will be cemented to 11600 ft and (injection zone is 14800 ft.) 23 Casing designs adequate for C, T, B & permafrost Yes 24 Adequate tankage or reserve pit Yes Doyon 141 has steel _pits. 25 If_a_ re -drill, has a 10-403 for abandonment been approved NA 26 Adequate wellbore separation _proposed Yes 27 If_diverter required, does it meet regulations NA Appr Date 28 Drilling fluid program schematic & equip list adequate Yes GLS 9/18/2019 '29 BOPEs,_do they meet regulation Yes 30 BOPE press rating appropriate; test to _(put psig in comments) Yes I31 Choke_manifold complies w/API-RP-53 (May 84) Yes I32 Work will occur without operation shutdown Yes �33 Is presence of H2S gas probable No 134 Mechanical condition of wells within AOR verified (For service well only) Yes I35 Permit -can be issued w/o hydrogen_ sulfide measures Yes Geology 36 Data presented on potential overpressure zones Yes Appr Date 37 Seismic analysis of shallow gas zones Yes SFD 9/4/2019 38 Seabed condition survey (if off_ -shore) NA I39 Contact name/phone for weekly -progress reports [exploratory only] Yes No issues with collision Diverter waived per 20_AAC_ 25.035 (h_)(2) ..On pad. Max formation press= 1947_psi _( 9.0ppg EMW) Drilling with 8.0 ppg OBM and MPD to 11 ppg EMW 13 5/8" 5000 psi WP BOPE.._. 14 day test cycle. MASP = 1531 psi_ Will test BOPE to_3500 psi CBL required... SCM_T_memory log on liner run planned. H2S not predicted but rig will have sensors and alarms. 1/4 mile AOR Complete._ No wells in affected area. PH will be fully cemented in OH area. None encountered in nearby well CD4-595 drilled to same pool. Rig has sensors and alarms. None anticipated:_ none encounterd in nearby well CD4-595, which drilled the same geologic section. None anticipated based on seismic shallow hazards review for this well, for CD4-595 and based on more in-depth analysis for nearby CD4-595. Planned mud program conforms to that used in CD4-595 and Pikka B wells. Manage Pressure Drilling equipment will be utilized._ Aaron Donat 907-265-1089._ Geologic Engineering Public Rig will be on 14 day BOPE test cycle. AIO required before injection commences. Exploratory Water injection well. GIs Commissioner: Date: Commissioner: Date Commissioner Date