Department of Commerce, Community, and Economic Development
Alaska Oil and Gas Conservation Commission
Loading...
HomeMy WebLinkAbout197-211Pages NOT Scanned in this Well History File
XHVZE
This page identifies those items that were not scanned during the initial scanning project.
They are available in the original file and viewable by direct inspection.
/~ ~- ,-~// File Number of Well History File
PAGES TO DELETE
Complete
RESCAN
[] Color items - Pages:
n
Grayscale, halftones, pictures, graphs, charts-
Pages:
Poor Quality Original- Pages:
[] Other- Pages:
DIGITAL DATA
[] Diskettes, No.
[] Other, No/Type
-OVERSIZED
[] Logs of various kinds
n Other
COMMENTS:
Scanned by: Beverly Mildred Damtha Lowell
Date.: ~//~'/'
TO RE-SCAN
Notes:
Re-Scanned by: Bevedy Mildred Daretha Nathan Lowell Date: /si
` STATE OF ALASKA
ALASKA IL AND GAS CONSERVATION COM~SSION
WELL COMPLETION OR RECOMPLETION REPORT AND LOG
i~
1 a. Well Status: ^ Oil ^ Gas ^ Plugged ®Abandoned ^ Suspended
zoAAC zs.~os zoAAC zs.»o
^ GINJ ^ WINJ ^ WDSPL ^ WAG ^ Other No. of Completions Zero 1 b. Well Class:
®Development ^ Exploratory
^ Service ^ Stratigraphic
2. Operator Name:
BP Exploration (Alaska) Inc. 5. Date Comp., Susp., or Aband.
9/12/2008 12. Permit to Drill Number
197-211 - 308-181 -
3. Address:
P.O. Box 196612, Anchorage, Alaska 99519-6612 6. Date Spudded
06/16/1998 13. API Number
50-029-20594-01-00
4a. Location of Well (Governmental Section):
Surface:
'
' 7. Date T.D. Reached
06/21/1998 14. Well Name and Number:
PBU N-14A-
3917
FNL, 4731
FEL, SEC. O8, T11N, R13E, UM
Top of Productive Horizon:
1478' FNL, 3383' FEL, SEC. 08, T11 N, R13E, UM
8. KB (ft above MSL): 74.47' '
Ground (ft MSL): 43.57'
15. Field /Pool(s):
Prudhoe Bay Field / Prudhoe Bay
Total Depth:
1330' FNL, 3468' FEL, SEC. 08, T11 N, R13E, UM 9. Plug Back Depth (MD+TVD)
9875' 9073' Pool
4b. Location of Well (State Base Plane Coordinates, NAD 27):
Surface: x- 634410 y- 5967267 Zone- ASP4 10. Total Depth (MD+TVD)
9960' - 9151' - 16. Property Designation:
ADL 028282 -
TPI: x- 635706 y_ 5969730 Zone- ASP4
Total Depth: x- 635618 y- 5969876 Zone- ASP4 11. SSSV Depth (MD+TVD)
None 17. Land Use Permit:
18. Directional Survey ^ Yes ®No
mi I r ni n rin d inf rm io 19. Water depth, if offshore
N/A ft MSL 20. Thickness of Permafrost (TVD):
1900 (Approx.)
21. Logs Obtained (List all logs here and submit electronic and printed information per 20 AAC 25.071):
MWD, GR, DIR, RES / AIT, DT / BHC, CNL, LDL, GR, Caliper, SP, MRES
22. CASING, LINER AND CEMENTING RECORD
CASING SETTING DEPTH MD SETTING DEPTH TVD HOLE AMOUNT
WT. PER FT. GRADE TOP BOTTOM TOP BOTTOM SRE CEMENTING RECORD PULLED
" In I a 11 "
~~ 7 "
1 ~~
23. Open to production or inject ion? ^ Yes ®No 24. TUBING RECORD
If Yes, list each i
(MD+TVD of Top & Bottom; Pe nterval open
rforation Size and Number): SIZE DEPTH .SET MD PACKER .SET MD
4-1/2", 12.6#, 13Cr 9159' 9058'
MD TVD MD TVD 4-112", 12.6#, L-80 9159' - 9242' 9186'
} : ,q ~;~ ,~ ~~ t `, ~`,~ ~} ~`~ ~ ~~~
id
~ 25. ACID, FRACTURE, CEMENT SQUEEZE, ETC.
. c u
..~ ~
.c~.
DEPTH INTERVAL MD
AMOUNT Et KIND OF MATERIAL USED
9500' Set CIBP
9467' Set Whipstock
9467' P&A w/ 8 Bbls Class 'G'
26. PRODUCTION TEST
Date First Production:
Not on Production Method of Operation (Flowing, Gas Lift, etc.):
N/A
Date Of Test: HOUfS Tested: PRODUCTION FOR
TEST PERIOD OIL-BBL: GAS-MCF: WATER-BBL: CHOKE SIZE: GAS-OIL RATIO:
Flow Tubing
PreSS. Casing Press: CALCULATED
24-HOUR FL4TE• OIL-BBL: GAS-MCF: WATER-BBL: OIL GRAVITY-API (CORK):
27. CORE DATA Conventional Core(s) Acquired? ^ Yes ®No Sidewal l Core s A wired? Yes ®No
If Yes to either question, list formations and intervals cored (MD+TVD of top and bottom of each), and summarize lithology and presence of oil, gas or water
(submit separate sheets with this form, ff needed). Submit detailed descriptions, core chips, photographs and laboratory analytical results per 20 AAC 250(/.071.
,, .. ~_ 117IY ..
None 9f~-O~
~~
corm its-av~ K~vl~s CONTINUED UN KEVERSE 51DE
I
~~ v
28. GEOLOGIC MARKERS (LIST ALL FORMATIONS AN KERS ENCOUNTERED): 29. FORMATION TESTS
NAME MD TVD Well Tested? ^ Yes ®No
Permafrost Top If yes, list intervals and formations tested, briefly summarizing test
results. Attach separate sheets to this form, if needed, and submit
Permafrost Base detailed test information per 20 AAC 25.071.
Sag River 9389' 8627' None
Shublik 9427' 8661'
Sadlerochit 9523' 8749'
Formation at Total Depth (Name):
30. List of Attachments: Summary of Pre-Rig Work and Daily Drilling Reports, Well Schematic Diagram
31. I hereby certify that the foreg ing is true and correct to the best of my knowledge.
~
/~ ~
w
Signed Terrie Hubble Title Drilling Technologist Date ~
PBU N-14A 197-211 308-181 Prepared ey Name/Number. Terre Hubble, 5644628
Well Number N ~ Drilling Engineer: Sean McLaughlin, 564-4387
INSTRUCTIONS
GeNeRA~: This form is designed for submitting a complete and correct well completion report and log on all types of lands and leases in Alaska. Submit a well
schematic diagram with each 10-407 well completion report and 10-404 well sundry report when the downhole well design is changed.
ITeM 1a: Classification of Service Wells: Gas Injection, Water Injection, Water-Alternating-Gas Injection, Salt Water Disposal, Water Supply for Injection,
Observation, or Other. Multiple completion is defined as a well producing from more than one pool with production from each pool completely
segregated. Each segregated pool is a completion.
ITeM 4b: TPI (Top of Producing Interval).
ITeM 8: The Kelly Bushing and Ground Level elevation in feet above mean sea level. Use same as reference for depth measurements given in other
spaces on this form and in any attachments.
ITeM 13: The API number reported to AOGCC must be 14 digits (ex: 50-029-20123-00-00).
IreM 20: Report true vertical thickness of permafrost in Box 20. Provide MD and TVD for the top and base of permafrost in Box 28.
ITeM 22: Attached supplemental records for this well should show the details of any multiple stage cementing and the location of the cementing tool.
ITeM 23: If this well is completed for separate production from more than one interval (multiple completion), so state in item 1, and in item 23 show the
producing intervals for only the interval reported in item 26. (Submit a separate form for each additional interval to be separately produced, showing
the data pertinent to such interval).
ITeM 26: Method of Operation: Flowing, Gas lift, Rod Pump, Hydraulic Pump, Submersible, Water Injection, Gas Injection, Shut-In, or Other (explain).
ITeM 27: Provide a listing of intervals cored and the corresponding formations, and a brief description in this box. Submit detailed description and analytical
laboratory information required by 20 AAC 25.071.
ITeM 29: Provide a listing of intervals tested and the corresponding formation, and a brief summary in this box. Submit detailed test and analytical laboratory
information required by 20 AAC 25.071.
Form 10-407 Revised 02/2007 Submit Orginal Only
Digital Well File
Well: N-14
Well History
Well Date
N-14A 5/29/2008
N-14A
N-14A
6/2/2008
. Page 1 of 2
Summary
T/IA/OA= 600/360/0 Temp=cold PPPOT-T (PASS) PPPOT-IC (PASS)
PPPOT-T RU 2 HP bleed tools onto THA 1500 psi to 0 psi, flush void until clean returns achieved.
Pressured to 5000 psi for 30 minute test, 5000/ 15 minutes, 5000/ 30 minutes. Bleed void to 0 psi, RD
test equipment, re installed Alemite cap. Cycle and torque LDS "ET style" all moved with no problems.
PPPOT-IC RU 2 HP bleed tools onto IC test void 150 psi to 0 psi. Pressured to 3500 psi for 30 minute
test, 3500/ 15 minutes, 3450/ 30 minutes. Bleed IC void to 0 psi, RD test equipment re installed Alemite
cap. Cycle and torque LDS "ET style" all moved with no problems.
T/I/O = 20/370/50. Temp = SI. T & IA FL (pre CTD). AL line locked out and blinded @ casing valve. ALP
= 1650 psi. T FL @ 150' (2.5 bbl). IA FL @ 1092' (59 bbl).
6/7/2008 ***WELL S/I ON ARRIVAL*** (pre CTD)
DRIFTED TO XN NIPPLE @ 9230' MD W/ 3.805" GAUGE RING
DRIFTED TO TOP OF IBP @ 9287 SLM W/ 3.70" CENTRALIZER,
ATTEMPT TO PULL IBP
***CONT ON 6-08-08 WSR***
N-14A 6/8/2008 ***CONT FROM 6-07-08*** (pre ctd)
PUI 13-3/8" BAK R IBP FRnM A ~~n° MD (MIGGIN(, R(~TH RIIRRER M NTS & STIFFN R RINGI
RECOVERED BOTH RUBBER ELEMENTS & STIFFNER RING FROM 9,747' SLM
TACK TD W/ 3.70" C;FNTRAI 17FR SAMPLE BAILER 9747' SLM (9769' MD, 22' CORRECTION
FROM XN TAG) *RECOVERED SAMPLE OF FORMATION SAND*
DRIFT W/ 20' X 3.68" DUMMY WHIPSTOCK, REACHED 9639' SLM, 9661' MD.
***JOB COMPLETE, WELL LEFT S/I, PAD OP NOTIFIED***
N-14A 6/9/2008 INTIAL T/I/O 10/340/0. WELL SHUT-IN ON ARRIVAL. SSV DIFFICULT TO DUMP DURING FUNCTION
TEST.
RU ELINE TO SET 3.6" BAKER CIBP IN 4-1/2" TUBING AT 9500 FT. LRS PT PLUG IN CMIT T X IA TO
3500 PSI. 3.65" POWERCUTTER CUT OF 4-1/2" TUBING AT 9125 FT.
N-14A 6/9/2008 ***WELL SHUT-IN ON ARRIVAL***
INITIAL WHP's= 10/340/0.
SET 3.60" BAKER CIBP IN 4-1/2" LINER Q 9500'.
LRS ATTEMPTED TO CMIT TxIA TO 3500 PSI...FAILED @ 0.5 BPM LLR
t~rT ~wlrw n ~~II I I~"~e'~ ~~ ~I"~II I l'.I rfn •~II'Y f~l r rl rLIr~IT /-T llAlli! T/lll /"
CURRENTLY RUNNING IN WITH PR
***CONTINUED 10-JUN-2008***
N-14A 6/9/2008 T/I/0=10/350/50 Temp= S/I Assist E-line (Pre CTD) CMIT-TxIA *** FAILED *** to 3500 psi Pumped 87.5
bbls of 90* crude down IA to reach 3500 psi for CMIT TxIA 1st test 1st 15 min lost 860/780 psi Re-psi w/
12.7 bbl 2nd test 1st 15 min lost 580/700 psi. Unable to psi up for 3rd MIT test. Attempt LLR pumped
down IA C .50 bpm C~ 3320 psi TBG 3160 psi for 10 bbls. E-line set 2nd plug. Pumped 11.6 bbls of 70*
crude down IA to reach 3500 psi for CMIT TxIA 1st test 1st 15 min TBG/IA lost 640/720 psi. Re-psi w/ 4.2
bbl crude. 2nd test 1st 15 min TBG/IA lost 560/680 psi. Established LLR pumped down IA @ .50 bpm C«?
3330 psi TBG psi= 3180 *** Job continued on 6-10-08 ***
N-14A 6/10/2008 ****CONTINUED FROM 9-JUN-2008****
LEAK DETECT LOG RAN FROM SURFACE TO 9490 FT TO DIAGNOSE 0.5 BPM LLR AT 3300 PSI
DURING CMIT T X IA. FLUID LEAKING PAST PLUGS.,
THIRD PLUG HALLIBURTON FAS DRILL BRIDGE PLUG SET WITH MEAT 9205.2'
I. J TUBING POSTPONED. RIG
DOWN.
****JOB COMPLETE****
N-14A 6/10/2008 *** Job continued from 6-9-08 *** Assist E-line with LDL (Pre CTD) Pumped 20.5 bbls crude down IA
while E-line logged FWHPs= 460/420/60 *** Casing valves left open to gauges***
N-14A 6/10/2008 T/I/O = 750/750/0 Temp = SI Assist E-Line with a CMIT TxIA to 3500 psi FAILED. (Pre CTD) Pumped
13.5 bbls of crude into the IA to reach 3420 psi. Established a LLR of 0.95 BPM @ 3420 psi for 10 bbls.
Bled back 10 bbls FWHP's = 400/400/0
Tags hung, casing valves open to gauges.
N-14A 6/22/2008 INITIAL T / I / O = 300 / 350 / 0 PSI. -3/8" IBP MID ELEMENT IN PACKER BORE AT
9187.6'. 1.75" FISHING NECK 6.5' ABOVE CENTER ELEMENT, AT 9181.1'. OVERALL LEN TH O
IBP IS 11.6'. TWO 5-3/4" SEALING ELEMENTS, ONE 1"STIFFENER RING. FINAL T/I/O = 900/900/0
http://digitalwellfile.bpweb.bp.coin/WIInfo/Reports/ReportViewer.aspx 10/3/2008
Digital Well File Page 2 of 2
• •
PSI.
***JOB COMPLETE***
09/07/08: IBP MONTHLY RENTAL FOR 07/22/08 - 08/30/08. MOs 2 (TLH); PLUG PULLED 8/30/08
DURING RWO+
N-14A 6/22/2008 T/I/O = 900/800/50 Temp = S/I - ~~IT TYIQ Foil Fn +~ ~~nn ~(Pra ,TDI - E-line on well prior to test.
Starting pressures 300/300/50. Pressured up TxIA to 3500/3420 psi w/10.4 bbls 85* crude. (3rd test, for
previous test results see AWGRS log) TxIA lost 140/160 psi in 1st 15 min and 120/120 psi in 2nd 15 min
for a total loss of 160/180 psi in 30 min test. llnahla to actahlich LLR nPr IPak ton small for biq sumo.
Bleed back pressures. **` Job continued on 06/23/08 WSR ***
N-14A 6/23/2008 *** Job continued from 06/22/08 WSR ***
Post CMIT TxIA bleed and rig down. FWP's = 200/100/40 *** DSO notified of all valve postions; swab
closed, master open, wing closed, lateral closed, IA open, A/L closed, and OA open. Tags hung on IA,
master and wing. '**
N-14A 6/23/2008 T/I/O = 460/360/40 Temp = S/I - CMIT TxIA PASSED to 1000 psi (Pre CTD) -Pressured up TxIA to
1100/1000 psi w/2 bbls 85* crude. TxIA lost 60/60 psi in 1st 15 min and 20/20 psi in 2nd 15 min for a total
loss of 80/80 psi in 30 min test. Bled back pressures. FWP's = 120/20/40
*** DSO notified of all valve postions; swab closed, master open, SSV open, IA open, OA open, A/L
closed, wing closed, lateral closed, tags hung ***
N-14A 6/29!2008 T!I/0= 150/200150. Temp SI. Bleed WHP's to 0 psi (CTD) prep. AL line SI in @ the casing valve (locked
out) w/ 100 psi. TBG, IA & OA FLs ~ surface. Bled OAP from 50 psi to 0 psi in 30 min (all gas). Bled IAP
from 200 psi to 0 psi in 15 min (all liquid). Bled TP from 150 psi to 50 psi in 2 hours (all liquid). SI the
bleed & monitored the TP BUR for 1 hour. TP increased to 90 psi. SI master valve opened wing valve &
bled the flowline from 150 psi to 0 psi in 45 min (gas & liquid). SI wing valve opened the master valve. TP
increased from 90 psi to 110 psi. Bled TP from 110 psi to 40 psi in 30 min (liquid & gas). *** Bled trailer is
full vac truck requested***. SI bleed & monitored pressure BUR for 30 min. Flowline unchanged, TP
increased 25 psi, IAP unchanged, OAP increased 5 psi .Final WHPs= 65/0/5
N-14A 6/29/2008 T/I/O = 65NAC/10. Temp = SI. Bleed WHPs to 0 psi (CTD). AL line SI & locked out C~3 casing valve. ALP
= 180 psi. TBGP unchanged, IAP decreased to a VAC, OAP increased 5 psi overnight. Unable to bleed
WHPs due to wind directed towards rig on pad.
N-14A 7/9/2008 T/I/0= 55NAC/20. Temp= SI. Bleed WHPs to 0 psi (CTD prep). Flowline, A/L & wellhouse removed. TBG
& OA FL near surface. Bled TP from 55 psi to 20 psi in 3 hours (fluid & gas). Bled OAP from 20 psi to 0
psi in 35 minutes (all gas). Monitored for 30 minutes, TP increased 5 psi, OAP unchanged. Final WHPs=
25NAC/0.
N-14A 7/10/2008 T/I/0= 35NAC/15. Temp= SI. Monitor (post WHP bleed). TP increased 10 psi, IAP remained unchanged,
OAP increased 10 psi overnight.
N-14A 8/10/2008 T/IA/OA= N/A/0/0 Temp=Sl PPPOT-T (PASS) PPPOT-IC (PASS)
PPPOT-T: Stung into test void, 0 psi. Function all LDS "ET style" all moved freely (2"). Pumped through
void, clean returns. Pressured to 5000 psi for 30 minute test, lost 100 psi in 15 min, lost 20 psi in second
15 min. Bleed void to 0 psi.
PPPOT-IC: Stung into test void, 0 psi. Function all LDS "ET style" all moved freely (2"). Pumped through
void, clean returns. Pressured to 3500 psi for 30 minute test, lost 50 psi in 15 min, lost 0 psi in second 15
min. Bleed void to 0 psi.
N-14A 8/12/2008 T/I/0=80/0/0 RE-CMIT TxIA 1000_PASSED psi (10 min test only) (pre CTD) Spear in with 2 bbls 60/40
meth followed y 6 bbls crude to reach test pressure. T/IA lost 50/50 psi in 10 min. Pumped .3 bbls crude
to re-pressure. T/IA lost 40/40 psi in 1st 10 min, 10/20 psi in 2nd 10 min. **Annulus valves open to
gauges, Pad op notified & caution tags hung.** FWHP's=0/0/0
N-14A 8/13/2008 T/I/0=140/60/0 (Pre RWO) MIT OA to 2000 psi. ***Job In Progress Continued On WSR 8-14-08***
N-14A 8/14/2008 **'Job In Progress Continued From WSR 8-13-08*** MIT OA PASSED to 2000 osi..Pumped 3.1 bbls
crude to reach test pressure. 1st 15 min lost 120 psi, 2nd 15 min lost 20 psi for a total loss of 140 psi in
30 min. FWHP's=140/60/0
Annulus casing valves tagged and left open to gauges
DSO notified of valve positions upon departure. swab= shut, wing= shut, ssv= open, master= open, IA=
open, OA=open
N-14A 8/19/2008 T/I/0=100/0/0; Set 6-3/8" CIW "J" BPV #416 thru tree ore Nordic 2: 1-2' ext. used, tagged C~ 106";
(Best/Wortham)
Print Date: 10/3/2008 Page 1 of 1
http://digitalwellfile.bpweb.bp.com/WIInfo/Reports/ReportViewer.aspx 10/3/2008
•
BP EXPLORATION
Operations Summary Report
Page 1 of 20
Legal Well Name: N-14
Common Well Name: N-14 Spud Date: 8/27/2008
Event Name: REENTER+COMPLETE Start: 8/27/2008 End: 9/22/2008
Contractor Name: NORDIC CALISTA Rig Release: 9/22/2008
Rig Name: NORDIC 2 Rig Number:
Date From - To Hours Task Code NPT Phase Description of Operations
8/26/2008 06:00 - 07:00 1.00 MOB P PRE
07:00 - 15:30 8.50 MOB P PRE
15:30 - 16:45 1.25 MOB P PRE
16:45 - 18:00 1.25 MOB P PRE
18:00 - 18:45 0.75 MOB P PRE
18:45 - 23:15 4.50 MOB P PRE
23:15 - 00:00 0.75 MOB P PRE
8/27/2008 00:00 - 02:30 2.50 RIGU P PRE
02:30 - 03:30 ~ 1.00 ~ BOPSUF{ P ~ ~ PRE
03:30 - 03:40 I 0.171 BOPSU~ P I PRE
03:40 - 10:15 6.58 BOPSU P PRE
10:15 - 14:30 4.25 BOPSU P PRE
14:30 - 14:45 0.25 BOPSU P PRE
14:45 - 17:45 3.00 BOPSU P PRE
17:45 - 00:00 6.25 BOPSU P PRE
8/28/2008 ~ 00:00 - 01:00 ~ 1.00 ~ BOPSUF~ P ~ ~ PRE
01:00 - 01:30 I 0.501 BOPSU~P I I PRE
01:30 - 09:30 8.00 BOPSU P PRE
09:30 - 12:30 3.00 BOPSU N RREP PRE
12:30 - 15:15 2.75 BOPSU P PRE
15:15 - 16:30 1.25 BOPSU P PRE
Hold PJSM with all crew. Perform final walk around. Back rig
off well. Spot on pad.
Standby for rig mats to be spotted on access road.
Remove CT 7-1/16" BOPS from cellar.
Load out rig mats. Clean up around wellhead.
Complete post pad inspection on V-115 with DSO.
Lay herculite and set 13-5/8" BOPE on skid behind N-14. Set
a few rigmats
Move office trailer to N Pad
Rig mats are spotted on access road. Move rig down V Pad
and onto access road and head to the Spine
Head east down the Spine Road
C/O at Z pad entrance.
Head east down the Spine Road
Turn onto N pad access road. Spot rest of rig mats & dunnage.
Inspect wellhead/tree & area, T/I/O = na/0/0, SI all tree valves
& whitey valves. PJSM regarding backing onto rig mats &
spotting over well. Review ADW SOP for moving over well with
crew. Spot rig over well & set rig down. Ria accepted at
02:30hrs.
RU handy berm. ND tree scaffolding. ND tree cap. Spot tiger
tank, welding shop, cuttings box & spill shack. DSM RU
hardline to tiger tank. Order rig fuel & rig water for BOPE
testing,
PJSM regarding pulling BPV & setting TWC.
RU DSM lubricator. Test tiger tank line to 500psi. Pull 6-3/8"
CIW "J" BPV. Set 6-3/8" CIW TWC. PT above to 3500 si,
below to 1000 si. RDMO DSM ,
ND 6" CIW tree and adaptor flange and load out
Chk 7" NSCC threads in hanger w/ 8-1/2 RH turns
Safety mtg re: skid in/NU BOPE
Skid in 13-5/8" stack. Lift w/ bridge crane and NU. NU
CIW/Barber spool
NU choke and kill lines. Pick up CIW mandrel w/ 10ft of
lubricator & test fit in CIW spool piece -very tight fit & stuck for
30 min, work it loose & lay it down. C/O air boots & RU riser.
Get BOP measurements. Label BOP panels. Function test
BOP's. Grease mud cross valves.
MU & torque test joint & place in well, Fitl stack, lower boot on
riser has slight leak, will fix after BOP test. RU IA & OA SLB
gauges.
Shell test BOPE 250psU3500psi. Fix choke line leak. Shell test
BOPE 250psi/3500psi -good test.
Perform week) BOPE test er AOGCC re s. Chuck Schev
waived witnessingBOP test. Test VBR's w/ 4-1/2" test joint.
Fix lower boot on riser
Have trouble getting test on valve #3. Rebuild and no go.
Replace valve and retest, okay
RU and install new CIW mandrel in CIW/Barber spool w/ 14' of
7" lub to RF. Took a couple tries to get fully seated. RILDS
and BOLDS. Pull back out w/ no problem using Coppertone
pipedope and WD40. Reset and RILDS. PT 250/3500
Rrinn nGM ~iihricator to the floor. PT ~ 600 asi. RIH and latch
Printed: 9/30/2008 11:55:56 AM
BP EXPLORATION Page 2 of 20
Operations Summary Report
Legal Well Name: N-14
Common Well Name: N-14 Spud Date: 8/27/2008
Event Name: REENTER+COMPLETE Start: 8/27/2008 End: 9/22/2008
Contractor Name: NORDIC CALISTA Rig Release: 9/22/2008
Rig Name: NORDIC 2 Rig Number:
Date From - To Hours Task Code NPT Phase Description of Operations
8/28/2008 15:15 - 16:30 1.25 BOPSU P PRE TWC and well has 40 psi SITP, 10 psi IAP. Attempt to bleed
down WHP in 3 stages and took 12 bbls plus a fair amount of
gas to the TT. SITP 100 psi. Bled IA quickly to zero. Don't
have enough lubricator pull TWC above blind rams
16:30 - 18:00 1.50 BOPSU P PRE Discuss w/ Sean McLaughlin. Add second valve to IA and RU
to rev, Order more fluids
Ken Miller on location. Notify Chuck Scheve w/ AOGCC
18:00 - 21:00 3.00 BOPSU P PRE C/O w/ day crew. PJSM & walk walk around. RU hose & choke
from IA to Tiger tank line to take ruturns from IA while pumping
down tubing.
21:00 - 22:10 1.17 BOPSU P PRE Reverse circulate 100bb1s ~ 180 stks/min.
22:10 - 23:50 1.67 BOPSU P PRE Circulate 500bb1s down the tubing f~ 180stks/min. Bleed down
OA to slop trailer.
23:50 - 00:00 0.17 BOPSU P PRE Stop pumping & bleed off pressure. 130psi on the tubing &
100 si on the IA -holing steady & not drooninn_
8/29/2008 00:00 - 00:40 0.67 BOPSU P PRE Circulate 175bb1s down the tubing & up the IA. Bleed down OA
to slop trailer. Total of 675bb1s pumped down the tubing ~
180stks/min.
00:40 - 00:50 0.17 BOPSU P PRE Pits are MT. Stop pumping. Bleed off IA & tubing to TT. Crude
returns from IA. Gas on the tubin .
00:50 - 02:15 1.42 BOPSU P PRE WHP = 4psi. IA = 8psi.
SI & monitor pressure.
STP in GPB is broken, traffic jam at the hot water plant. G&I is
down, traffic jam at Pad 3. Wait on fluid from hot water plant &
dirty vac truck. RU 4-1/2" handling equipment.
02:15 - 04:00 1.75 BOPSU P PRE WHP = 15psi. IA = 83psi.
Load 290bb1s into the pits. Load some drill pipe into the
pipeshed.
04:00 - 05:35 1.58 BOPSU P PRE WHP = 15psi. IA = 94psi.
Load 200bb1s into the pits. Bleed off gas in the tubing & fill up
tubing with C-pump - 19bbls.
Having vac truck problems -won't build a vac
05:35 - 08:00 2.42 BOPSU P PRE Circulate down the tubing, taking returns up the IA ~ 130
stks/min.
After 100 bbls, continue to circ 4.4/360 w/ 310 IAP, 70 OAP w/
open choke
After 500 bbls 4.4/360 w/ 290 IAP, 290 OAP
08:00 - 10:30 2.50 BOPSU P PRE After 605 bbls (2nd circ) take returns to pits at red rate of
2.44/120 w/ 105 IAP and 322 OAP
After -10 bbls as alarms went off and had max 22% LEL.
Resume taking returns to TT. Due to truck shortage and
assuming most of diesel is out of weUbore, start recycling fluid
10:30 - 12:45 2.25 BOPSU P PRE After additional 150 bbls, take fluid back to pits and monitor
4-8% LEL. Bleed OA from 250 psi to zero. Continue to circ
recycled 1 % KCI 2.3/114 w/ 107 IAP, 10 OAP and have short
durations of 10-20% LEL
12:45 - 15:30 2.75 BOPSU P PRE After 575 bbls (3rd circ) LEL was at 3-8%. Circ 2.35/110 w/
103 psi IAP, 10 OAP
15:30 - 17:00 1.50 BOPSU P PRE After 365 bbls LEL was 0-8%, with avg <3%. SD pump and
monitor for flow from the IA. PVT 363 Bleed OAP to zero No
flow from IA
17:00 - 19:05 2.08 BOPSU P PRE Resume circ 2.44/125 w/ 96 IAP during crew changes. LEL =
°.~.,~e.i~ °/9l1MMR 11•S5•SR Alin
BP EXPLORATION Page 3 of 20
Operations Summary Report
Legal Well Name: N-14
Common Well Name: N-14 Spud Date: 8/27/2008
Event Name: REENTER+COMPLETE Start: 8/27/2008 End: 9/22/2008
Contractor Name: NORDIC CALISTA Rig Release: 9/22/2008
Rig Name: NORDIC 2 Rig Number:
Date From - To Hours Task Code NPT Phase Description of Operations
8/29/2008 17:00 - 19:05 2.08 BOPSU P PRE 0. Stop pumping.
19:05 - 19:30 0.42 BOPSU P PRE Flow check. PJSM.
19:30 - 21:30 00
2 BOPSU P PRE Attem t to ull CIW m ndr I with to r - no . Po
. l ubricator & disconnect from pulling tools. Install lifting cap &
hook u to the blocks. Pull - 12k to t IW
Mandrel is scarred with mushrooming from lockdown screws &
upward force from pumping, upper o-ring on mandrel was tore
up. RD & LD DSM lubricator & pulling tools. Call for slickline
unit.
21:30 - 22:30 1.00 FISH P DECOMP Run mandrel back into spool piece with great difficulties.
Removed upper o-ring on mandrel.
22:30 - 23:00 0.50 FISH P DECOMP Wait on slick line. Empty & clean pits. Bring on new KCL water.
23:00 - 00:00 1.00 FISH P DECOMP PJSM regarding RU slickline. RU slickline.
8/30/2008 00:00 - 03:15 3.25 FISH P DECOMP Continue to RU slickline. Stab onto well w/ slickline w/
equalizing tool & 1 tattle tail pin. P.T. 250/500 -good. Bleed off.
03:15 - 03:40 0.42 FISH P DECOMP RIH w/slickline. Shut in choke & jar down 5 times, no increase
in WHP.
03:40 - 04:10 0.50 FISH P DECOMP Pump across the top & POH. Tag up. Flow check. Pop off.
04:10 - 04:30 0.33 FISH P DECOMP Break off equalizing tool -tattle tail pin was bent over. MU
pulling tool. stab onto well.
04:30 - 04:55 0.42 FISH P DECOMP RIH w/ slickline.
04:55 - 05:10 0.25 FISH P DECOMP Latch fish & 'ar u 11 times. Move fish u hole 20ft let IBP
relax for 15 min.
05:10 - 06:45 1.58 FISH P DECOMP POH w/fish on.y
06:45 - 07:45 1.00 FISH P DECOMP Recovered IBP w/ upper rubber element. Missing lower
element and stiffener ring
SWS crew change
07:45 - 09:30 1.75 FISH P DECOMP RIH w/ 3 prong grab and found element at 8570'. RIH to tag at
-9150'. POH and recovered the lower element. Still missing
the stiffener ring PVT 444
09:30 - 11:00 1.50 FISH P DECOMP RIH w/ 3.75" GR to tag. POOH w/ slickline
Will mill u stiffener rin durin millout of Fas-dril lu
11:00 - 13:00 2.00 FISH P DECOMP RD SWS lubricator and BOP's. RDMO SWS
13:00 - 13:15 0.25 PERF P DECOMP Safety mtg re: RU SWS a-line
13:15 - 14:15 1.00 PERF P DECOMP MIRU SWS w/ WL packoff assy
14:15 - 17:30 3.25 PERF P DECOMP RIH w/ GR/CCUJet cutter for 4-1/2". Log tie-in. Jet cut tubing
at 9154' ELMD. POOH w/ a-line,
17:30 - 18:00 0.50 PERF P DECOMP RDMO SWS
18:00 - 20:15 2.25 PULL P DECOMP Pull bushings, BOLDS on CIW spool & pull mandrel out with
tugger. LD lubricator. RU floor tools for handling DP. MU 3-1/2"
DP landing joint w/ XO's & stab into hanger w/ 8-1/2 turns. RU
circulating hose. Open IA to tigertank -vac. BOLDS on
hanger.
20:15 - 20:45 0.50 PULL P DECOMP Pull hanger to the RF 104k break over point. Line up to CBU.
20:45 - 22:40 1.92 PULL P DECOMP CBU ~ 180stks/min. Soapy returns ~ 9000stks away - 2nd
GLM. RU SLB control line spooler. PJSM while CBU regarding
LD 4-1/2" completion.
22:40 - 22:50 0.17 PULL P DECOMP Flow check - no flow.
22:50 - 00:00 1.17 PULL P DECOMP Hook up control & balance lines to SLB spooler. Pull 4-1/2"
com letion from well bore fill hole eve 10 't .
8/31/2008 00:00 - 04:30 4.50 PULL P DECOMP Continue to pull 4-1/2" completion. 51 of 56 control line bands
recovered. Fill hole every 10 jts. Unload tubing from the
pipeshed,
BP EXPLORATION Page 4 of 20
Operations Summary Report
Legal Well Name: N-14
Common Well Name: N-14 Spud Date: 8/27/2008
Event Name: REENTER+COMPLETE Start: 8/27/2008 End: 9/22/2008
Contractor Name: NORDIC CALISTA Rig Release: 9/22/2008
Rig Name: NORDIC 2 Rig Number:
Date From - To Hours Task Code NPT Phase Description of Operations
8/31/2008 04:30 - 12:00 7.50 PULL P DECOMP Continue to pull 4-1/2" completion. Fill hole every 10 jts. Jts
50-70 have heavy corrosion & thickness loss. Found the first
holes in jts 120 and 123 (+/-4800'). Had 170 total joints OOH
at noon. Unload pipeshed. Wellbore is taking +/-2 bph
12:00 - 15:15 3.25 PULL P DECOMP Nordic crew change. PJSM
Finish LD a total of 217 'ts of 4-1/2" tubin w/ 6 GLM's. The jet
cut joint measured 18.87' and was flared to 4-13/16" max (good
cut). There were numerous 1/2" to 1" holes in the last 17 joints
enerall in the LS roove. The whole string had a very
evident LS groove with fair internal pitting and heavy external
pitting. Nearly every pin conection in the lower half was eroded
to paper thin at the bottom. Several of the last joints bodys
were deformed (crushed) while being held by the tongs during
breakout. See photos on server
15:15 - 16:00 0.75 PULL P DECOMP Unload pipeshed of recovered completion tubing and jewelry
16:00 - 16:45 0.75 RIGU P DECOMP Load Kelly, shuck and swivel into pipeshed
45 - 18:40
16 92
1 BOPSU P DECOMP Install test pIu~PT 3-1/2 DP 3500/250 in the VBR's and
: . 2500/250 in the annular. Remove test joint, pull test plug. Set
wear ring in tubing hanger 13-5/8"x9-1/16" w/ 2 LDS to hold in
place, labeled same. Set wear ring in CIW spool
13-5/8"x13-7/16" w/ 4 lower & 4 upper LDS to hold in place,
labeled same.
Load used 2-3/8" E-CT reel 15450E into reelhouse.
NORM test tubing & GLM's -over limits. Test CL spool, RF &
handling equipment -all within limits.
18:40 - 00:00 5.33 CLEAN P DECOMP PJSM for RU the Kelly. RU the Kelly. Put shuck in the rat hole.
Simultaneously load pipeshed with 3-1/2" DP, tally same. Well
is static.
9/1/2008 00:00 - 06:00 6.00 RIGU P DECOMP Continue to RU the Kelly, Kelly bushing, Kelly hose & Kelly
swivel hoses. Service the Kelly. Test rotary table. MU saver
sub. Torque all Kelly connections. Continue to load pipeshed
w/ 3-1/2" DP. Bleed down OA from 4 psi to slop oil trailer (gas)
& monitor for 3 hrs, remove hose after 3hrs - no flow, SI &
monitor OA, wrap OA & apply heat. RU spinners & test same.
RU 3-1/2" DP handling equipment. Clean RF.
06:00 - 07:00 1.00 CLEAN P DECOMP Bring BOT BHA to floor
07:00 - 07:15 0.25 CLEAN P DECOMP Safety mtg re: MU BHA
07:15 - 08:30 1.25 CLEAN P DECOMP MU washover BHA #1
08:30 - 10:30 2.00 CLEAN P DECOMP MU 14 4-3/4" DC's
10:30 - 11:00 0.50 CLEAN P DECOMP MU 20 jts 3-1 /2 DP
11:00 - 11:30 0.50 CLEAN P DECOMP MU 9-5/8" casing scraper
11:30 - 16:00 4.50 CLEAN P DECOMP Single in w/ 3-1/2 DP to 4290'
Adjust tong counterweights 1/2 hr
16:00 - 16:45 0.75 CLEAN P DECOMP RBUx2 2.4/300 to clean scale out of DP
16:45 - 18:00 1.25 CLEAN P DECOMP Continue single in w/ 3-1/2 DP
18:00 - 18:45 0.75 CLEAN P DECOMP Stop at jt 160. C/O w/ day crew. Perform walk around/spill
champion. Service rig. PJSM regarding tripping pipe.
18:45 - 22:30 3.75 CLEAN P DECOMP Single in with 3-1/2" DP. PU Kelly at 21:50. Reconfigue kelly
spinner hoses.
22:30 - 00:00 1.50 CLEAN P DECOMP Test upper & lower Kell valves er AOGCC re s
250ps' 3500psi -good. Shell test Kelly hose & mud manifold -
tighten 4" greylock on mud manifold.
9/2/2008 00:00 - 00:45 0.75 CLEAN P DECOMP Continue to pressure test Kelly hose. R/D test equipment.
orinfod• 4/3tlMOOR 1155[56 AM
o
BP EXPLORATION Page 5 of 20
Operations Summary Report
Legal Well Name: N-14
Common Well Name: N-14 Spud Date: 8/27/2008
Event Name: REENTER+COMPLETE Start: 8/27/2008 End: 9/22/2008
Contractor Name: NORDIC CALISTA Rig Release: 9/22/2008
Rig Name: NORDIC 2 Rig Number:
Date From - To Hours Task Code NPT Phase Description of Operations
9/2/2008 00:00 - 00:45 0.75 CLEAN P DECOMP Remove & send out CL spooler from RF.
00:45 - 01:30 0.75 CLEAN P DECOMP RBU at 90 sks/min ~ 700psi.
01:30 - 02:30 1.00 CLEAN P DECOMP Single in the hole with the Kelly from jt # 238 to jt # 243. No
i ssues with top of 7" liner. Circulate & rotate pipe, 180 Amps or
3800fUlbs, 88k up & 82k down.
02:30 - 02:40 0.17 CLEAN P DECOMP Blow down the Kelly & rack back in the shuck.
02:40 - 04:40 2.00 CLEAN P DECOMP Continue to single in with 3-1/2" DP. Mix 40bb1 hi-vis pill. 84k
RIW, 98k up weight. Taa (2k) at 9140ft on jt # 274. LD jt # 274.
PU the Kelly, 102k up weight. Circualte at 120 stk/min ~
1000psi, rotate ~ 200 Amps = 4000ft/Ibs. Tag at 9140ft.
04:40 - 05:15 0.58 CLEAN P DECOMP Mill on 4-1/2" stub at 9140ft mill for 10min swallow tubin &
work down 16ft & to 9156ft -mill with upper mill made -2",
mill for 15min. Stop rotating. PU, 10k drop in weight above
9140ft & lost 300psi in pump pressure. Pump hi vis pill. Work
up & down on stub -clean. Tag at 9156ft. PU.
05:15 - 07:30 2.25 CLEAN P DECOMP CBU ~ 120 stk/min.
Fin CBU ~ 4.95/1000 No metal or foreign objects noted.
07:30 - 08:20 0.83 CLEAN P DECOMP Blow down and set back kelly.
08:20 - 18:00 9.67 CLEAN P DECOMP ndin back DPI LD 9-5/8" casing scaper -good
condition. Continue to TOH standing back DP. LD DC's
sideways. Break apart lower mill (good indicaton inside of lower
mill). Break apart upper mill (good indicaton on upper mill).
18:00 - 20:15 2.25 CLEAN P DECOMP Crew change, Spill champion inspection, and PJSM.
Finish LD of BHA.
Unload DC's out of pipe shed.
20:15 - 20:40 0.42 CASE P DECOMP Bring in HAL tools.
20:40 - 21:00 0.33 CASE P DECOMP PJSM on PU of RBP packer and running procedures.
21:00 - 21:30 0.50 CASE P DECOMP PU RBP packer and MU to DP
21:30 - 00:00 2.50 CASE P DECOMP TIH with RBP.
9/3/2008 00:00 - 04:40 4.67 CASE P DECOMP continue to TIH with RBP paker.
04:40 - 05:10 0.50 CASE P DECOMP DWN WT = 78 K
UP WT = 82 K
Space out to set packer 15 ft in on jnt # 289.
Taged top of tubing stub at 20 ft in on jnt # 289. Set down 8 K
lbs.
PU and set packer 10 ft in ~ 9133.34 ft to of acker ~
9124.6 ft.
05:10 - 07:30 2.33 WHSUR P DECOMP RU and pressure test 7" casing.
Time IAP OAP
06:30 3500psi Opsi
06:45 3454psi Opsi
07:00 3450psi Opsi
Casin ressure test to 3 0 =
RD test equipment.
07:30 - 09:00 1.50 WHSUR P DECOMP LD 4 jts of 3-1/2" DP. Set RTTS packer 33ft from RF & test to
500psi for 10 min - ass.
09:00 - 13:00 4.00 WHSUR P DECOM Remove OA bleed hose & check for flow/pressure - no flow.
RU to IA & suck down stack. Pull upper & lower wear rings. RU
4-1/4" DC & casing packoff pulling tool. Bleed casing packoff
pressure to Opsi. Pull casing packoff - 30k. RU 1/2" conduit w/
chugger pump to suck out neck seal cavity. Run new casing
packoff. Perform ICPPOT - 3800psi -PASS.
13:00 - 16:25 3.42 WHSUR P DECOMP LD 4-1/4" DC. Set wear rings. RBIH with 4 jts. Latch RBP w/
o.......a. onnnnnn ~t~~t•4R e~~
BP EXPLORATION Page 6 of 20
Operations Summary Report
Legal Well Name: N-14
Common Well Name: N-14 Spud Date: 8/27/2008
Event Name: REENTER+COMPLETE Start: 8/27/2008 End: 9/22/2008
Contractor Name: NORDIC CALISTA Rig Release: 9/22/2008
Rig Name: NORDIC 2 Rig .Number:
Date From - To Hours Task Code NPT Phase Description of Operations
9/3/2008 13:00 - 16:25 3.42 WHSUR P DECOMP 15k below string wt. PU 5k over string wt -latched. Turn string
t o the right while PU & wt fell back to normal string wt. Let RBP
rubber relax. Turn string to the right to let torque out. PU 20ft &
15ft below setting depth to confirm RBP is upset.
16:25 - 17:20 0.92 WHSUR P DECOMP RBU ~ 90stks/min for 2 times the DP volume.
17:20 - 00:00 6.67 CLEAN P DECOMP Slowly TOH in the 7" standing back DP.
9/4/2008 00:00 - 00:40 0.67 CLEAN P DECOMP Continue TOH with RBP
00:40 - 00:45 0.08 CLEAN P DECOMP PJSM on LD and unloading of RBP Paker.
00:45 - 01:30 0.75 CLEAN P DECOMP LD acker and set outside.
No damage to packer observed, very light marking on bottom
of RBP bull noze, assumingly from top of tubing stub. Not
dented, not scrached.
01:30 - 03:30 2.00 BOPSU P DECOMP Rig up for weekly BOPE Test.
03:30 - 13:30 10.00 BOPSU P DECOMP Perform weekly BOPE Test as per AOGCC Regulations, Well
permit, and well plan.
Test witness waived by AOGCC Inspector, Lou Grimaldi.
Having difficulties with the blinds. Regrease valves, cycle
blinds, flush with water, troubleshoot. RILDS to energize seal
on test plug -blinds passed.
13:30 - 14:50 1.33 CLEAN P DECOMP Set lower & upper wear rings.
14:50 - 15:55 1.08 CLEAN P DECOMP PJSM regarding MU BHA. Hoist BOT BHA components to the
RF. MU lover dreac over chnP~ 16ft of wash pipe, inner
dressing mill + boot basket, jars & bumper sub.
15:55 - 23:00 7.08 CLEAN P DECOMP TIH w/ DP.
23:00 - 23:40 0.67 CLEAN P DECOMP PU Kelly, obtain parameters. 100K UW, 88K DW, & 98K RW.
Did not see any indication of top of tubing and bottom of wash
pipe tag. Tagged Top of tubing with inner mill at 9140' (bottom
of wash i e ~ 9156' . PU off of TT and repeated, again no
indication of TT and bottom of wash pipe tag. No milling was
done to prevent damaging tubing stub. Saw increase in pump
pressure both times the mill shoe went over the tubing stub.
The upper mill goes into the 4-1/2" stub 9" & an increase in
pump pressure was noted.
23:40 - 00:00 0.33 CLEAN P DECOMP Continue to pump biozan sweep out.
9/5/2008 00:00 - 00:50 0.83 CLEAN P DECOMP Continue to pump sweep to top of 7" then reverse circulate it
out,
00:50 - 01:20 0.50 CLEAN P DECOMP Blow down and stand back Kelly
01:20 - 01:35 0.25 CLEAN P DECOMP PJSM on LD & wash of Drill pipe for long term storage.
01:35 - 06:00 4.42 CLEAN P DECOMP TOH and LD drill pipe.
06:00 - 06:45 0.75 CLEAN P DECOMP C/O w/night crew. Spill champion. Service the rig. PJSM
regarding TOH w/ DP.
06:45 - 06:50 0
08 CLEAN P DECOMP Noticed sli ht as bubblin in the reserve it out behind the ri .
. Make a series of phone calls.
06:50 - 12:30 5.67 CLEAN P DECOMP Continue to TOH sideways, fill hole every 5 stds.
12:30 - 14:00 1.50 CLEAN P DECOMP With - 20k hanging weight, break apart the Kelly.
14:00 - 17:00 3.00 CLEAN P DECOMP Continue to TOH sideways, fill hole every 5 stds.
17:00 - 18:00 1.00 CLEAN P DECOMP LD BOT BHA.
18:00 - 18:30 0.50 CLEAN P DECOMP Crew change and PJSM on LD of BHA
18:30 - 19:30 1.00 CLEAN P DECOMP Continue to LD BHA, and send out BOT tools.
RIH with remaining stands in derick, and POOH laying down
sideways.
19:30 - 20:00 0.50 CLEAN P DECOMP Pull upper and lower wear rings, LD and send out.
20:00 - 20:15 0.25 CLEAN P DECOMP PJSM on LD of Kelly, Schuck, and swivel.
o...,.va• ei~nr~nna tt•SS•r,R eM
BP EXPLORATION Page 7 of 20
Operations Summary Report
Legal Well Name: N-14
Common Well Name: N-14 Spud Date: 8/27/2008
Event Name: REENTER+COMPLETE Start: 8/27/2008 End: 9/22/2008
Contractor Name: NORDIC CALISTA Rig Release: 9/22/2008
Rig Name: NORDIC 2 Rig Number:
Date From - To Hours Task Code NPT Phase Description of Operations
9/5/2008 20:15 - 00:00 3.75 CLEAN P DECOMP LD Kelly, Schuck, Swivel, and send out.
RD and put away 3.5" DP handling tools.
9/6/2008 00:00 - 00:20 0.33 BUNCO RUNCMP PJSM on loading pipe shed with 4.5" Completion
00:20 - 11:30 11.17 BUNCO RUNCMP Load pipe shed with 4.5" completion.
Strap and Drift completion. RU 4-1/2" handling equipment. RU
Doyon torque turn services.
11:30 - 18:00 6.50 BUNCO RUNCMP Running 13Cr 4-1/2" tubing,with Doyon Torque Turn (Torque =
4450 ft-Ib). All connections below the packer were Bakerlock'd.
Stop on jt # 67.
18:00 - 18:45 0.75 BUNCO RUNCMP Crew change and PJSM on running completion.
18:45 - 00:00 5.25 BUNCO RUNCMP Continue 13Cr 4.5" tubing from Jnt # 72 with Doyon Torque
Turn services. Target torque = 4450 ftllbs.
Kick out Jnt 145 and replace with Jnt 216.
9/7/2008 00:00 - 07:00 7.00 BUNCO RUNCMP Continue to run 4.5" completion.
Ta to of stum on 'nt # 212 1st shear ins ~ 9152ft 2nd
shear pins ~ 9160ft, and no ao ~ 9164 ft.
LD jt # 212. Space out and land hanger in the tubing spool on
jnt # 211 with 8 ft over the existing tubing stub. RILDS on
hanger.
07:00 - 09:20 2.33 BUNCO RUNCMP PJSM regarding RU slick-ine. LD landing joint. RU CIW
mandrel in spool. RU slickline. RD 4-1/2" handling equipment.
09:20 - 10:25 1.08 BUNCO RUNCMP RIH w/ 3.70"x21ft dummy whipstock drift via slickline. Tag at
9195ft 3 times.
10:25 - 10:45 0.33 BUNCO RUNCMP POH.
10:45 - 11:00 0.25 BUNCO RUNCMP Tag up. Flow check. LD dummy whipstock. RU RHC plug &
x-line.
11:00 - 12:30 1.50 BUNCO RUNCMP RIH w/ RHC plug. Set RHC in profile at 9080ft,
12:30 - 12:50 0.33 BUNCO RUNCMP POH.
12:50 - 13:15 0.42 BUNCO RUNCMP Tag up. Flow check. Stand back slickline. RU landing joint. RU
2" circulating hose.
13:15 - 17:30 4.25 BUNCO RUNCMP Reverse circulate 140bb1s of 140 deg F 1 %KCL ~
3bpm/286psi, followed by 345bb1s of corrosion inhibited 140
deg F 1 % KCL ~ 3bpm/300psi, followed by 120bb1s of SW
from the pits.
17:30 - 18:40 1.17 BUNCO RUNCMP Dro ball and rod to set acker.
Bring tubing pressure up to 1700 psi saw pressure bobble.
Continue to bring pressure up to 3500 psi.
18:40 - 20:05 1.42 BUNCO RUNCMP Pressure test tubin for 30 min with 3500 si.
Lost 50 psi over 30 min-Pass.
Bleed tubing down to 1500 psi.
Pressure up IA to 3500 si. and test 30 min.
Test pass with no noticeable loss in 30 min.
20:05 - 20:30 0.42 BUNCO RUNCMP Bleed down leaving pressure on the lA to shear DCR valve in
GLM#6.
DCR sheared at about 2000 psi.
Let IA and tubing pressure bleed down to zero.
20:30 - 20:45 0.25 BUNCO RUNCMP PJSM on RD of test equipment, RU of LRHOS, and FP opps.
20:45 - 21:00 0.25 BUNCO RUNCMP RU LRHOS and PT lines.
21:00 - 22:20 1.33 BUNCO RUNCMP Pump 110 bbls of diesel at 1.5 bpm down IA taking returns
through tubing to freeze protect IA to 2000 ft.
22:20 - 23:00 0.67 BUNCO RUNCMP RD LRHOS.
RD Kelly line
23:00 - 23:15 0.25 BUNCO RUNCMP PJSM with SLB SL crew for RU and SL opps
BP EXPLORATION Page 8 of 20
Operations Summary Report
Legal Well Name: N-14
Common Well Name: N-14 Spud Date: 8/27/2008
Event Name: REENTER+COMPLETE Start: 8/27/2008 End: 9/22/2008
Contractor Name: NORDIC CALISTA Rig Release: 9/22/2008
Rig Name: NORDIC 2 Rig Number:
Date From - To Hours Task Code NPT Phase Description of Operations
9!7/2008 23:15 - 23:30 0.25 BUNCO RUNCMP RU SLB SL
23:30 - 00:00 0.50 BUNCO RUNCMP RIH with SL to retrieve ball and rod.
9/8/2008 00:00 - 00:15 0.25 BUNCO RUNCMP RIH and latch ball and rod.
00:15 - 00:45 0.50 BUNCO RUNCMP POOH with ball and rod.
00:45 - 01:10 0.42 BUNCO RUNCMP change out SL tools for DCR pull run.
01:10 - 01:50 0.67 BUNCO RUNCMP RIH and pull DCR valve.
01:50 - 02:30 0.67 BUNCO RUNCMP H with DCR valve.
02:30 - 03:00 0.50 BUNCO RUNCMP RIH and set dummy valve in GLM #6
03:00 - 03:30 0.50 BUNCO RUNCMP POOH after setting valve
03:30 - 04:15 0.75 BUNCO RUNCMP RU triplex pump to IA and start to PT IA to 500 psi.
Triplex wont stay running, Call for new one.
RU second Triplex.
04:15 - 04:35 0.33 BUNCO RUNCMP PT IA to 500 si for 10 min.
04:35 - 06:00 1.42 BUNCO RUNCMP RD from lA test while SL RIH to pull RHC. Pop off well, RHC
plug was recovered.
06:00 - 06:45 0.75 BOPSU P RUNCMP Set 4" 'H' TWC & test to 3500 si -Pass.
06:45 - 15:00 8.25 BOPSU P RUNCMP Blow down kill line, choke line, cellar cement line & stack. RD
BOP riser. RD CIW spool piece. Open ram doors & remove
ram components for long term storage. ND choke & kill lines.
RU BOP lifting plate. Un chain BOP stack. Un hook BOP
hoses. ND BOP flange at tubing spool. Hoist 13-5/8" BOP onto
BOP skid.
15:00 - 17:00 2.00 BOPSU P PRE NU 13-5/8" x 4-1/6" adapter flange, torque up w/ sweeney
wrench.
17:00 - 17:30 0.50 BOPSU P PRE PPPOT-T to 5000psi, 30min test -PASS.
17:30 - 20:20 2.83 BOPSU P PRE NU 4-1/16" tree & jewellery.
20:20 - 20:50 0.50 BOPSU P PRE Pressure test tree.
Low pressure test to 250 psi, then High pressure to 5000 psi. -
no leaks
20:50 - 00:00 3.17 BOPSU P PRE Pull rig back off well. S of in 7 1/16" BOP skid, lift BOP's with
blocks and secure. Install Koomey lines. Spot rig back over
well head. NU BOP's.
9/9/2008 00:00 - 07:00 7.00 BOPSU P PRE Continue to NU 7 1/16" BOP's. RU Choke and Kill lines.
Grease mud cross valves & choke valves.
07:00 - 07:30 0.50 BOPSU P PRE Shell test to 3500psi. Slight leak on gey lock fitting, bleed off &
tighten. Repeat shell test -pass.
07:30 - 13:45 25
6 BOPSU P PRE Pressure test BOPE per AOGCC reas to 250osV3500osi Bob
. Noble waived witness of test.
13:45 - 14:30 0.75 BOPSU P PRE RD from BOP test.
14:30 - 14:45 0.25 RIGU P PRE PJSM on RU Injector Head and Pac-off
14:45 - 16:30 1.75 RIGU P PRE RU injector head, and pack off.
Make ready to stab coil
16:30 - 16:45 0.25 RIGU P PRE PJSM on stabing coil
16:45 - 18:20 1.58 RIGU P PRE Stab Coil into injector.
18:20 - 18:30 0.17 RIGU P PRE PJSM for cutting coil.
18:30 - 20:30 2.00 RIGU P PRE Cut 550 ft of coil.
Clear rig floor of tools and cut pipe.
Install SLB CTC.
20:30 - 20:40 0.17 RIGU P PRE PJSM on CTC pull test and PU of Jnt of PH6 for pumping
slack.
20:40 - 22:00 1.33 RIGU P PRE PuII test CTC. PU 1 jnt of PH6 and stab on well.
Pumped 110 bbls 2 ppb Biozan at 3 bpm.
Unstab from well and no E line sticking out of CTC.
s
BP EXPLORATION Page 9 of 20
Operations Summary Report
Legal Well Name: N-14
Common Well Name: N-14 Spud Date: 8/27/2008
Event Name: REENTER+COMPLETE Start: 8/27/2008 End: 9/22/2008
Contractor Name: NORDIC CALISTA Rig Release: 9/22/2008
Rig Name: NORDIC 2 Rig Number:
Date From - To Hours Task Code NPT Phase Description of Operations
9/9/2008 22:00 - 22:40 0.67 FISH P WEXIT MU BTT CTC.
BTT missing cross over needed from LH threads to RH threads
to PT and Pull test.
22:40 - 00:00 1.33 BOPSU P WEXIT While waiting on BTT hot shot.
Pressure test inner reel valve and pack off.
BTT cross over here by 23:40 -still testing though.
9/10/2008 00:00 - 00:15 0.25 FISH P WEXIT PJSM on PU of Millin BHA and stabbin on the injector.
00:15 - 01:10 0.92 FISH P WEXIT PU - LH Milling BHA with 3.70 piranha mill and 3.80 diamond
string mill.
Stab on injector
01:10 - 03:05 1.92 FISH P WEXIT RIH with Milling BHA.
at 9100 ft. 2.5 bpm ~ 1820 psi
Up WT=32K
Dn WT=23K
continue RIH to Fast drill.
03:05 - 08:00 4.92 FISH P WEXIT Ta to of fast drill ~ 9215.8 ft.
Stalled twice while RIH 0.4 fpm
Time mill ahead on top of wear ring and fast plug stopping
every 0.1 ft to allow time to mill off starting ~ 9215.5
Op=2.56/2.56 bpm ~ 2000psi.
Stalled again ~ 915.9 ft. - PU and start again from 9215.7 ft
Repeat
Eventual) mill to 9217.5'. Unable to make an additional
ro ress for several hours.
Frequent stalls. Pick up after stalls initially smooth, then began
to get overpulls.
CT up wt: 27k#. Overpulls up to 46k#.
Discuss options with town. Decide to rig up slickline.
08:00 - 10:00 2.00 FISH N DPRB WEXIT Circulate out of hole. Had a few overpulls.
10:00 - 10:30 50
0 FISH N DPRB WEXIT La down millin BHA. Piranha mill and strip reamer showed
. significant sunk wear on gauge areas. Face of piranha mill
showed little wear. Looks like hard junk was up along side
mills.
10:30 - 12:30 2.00 FISH P WEXIT Cut and slip drilling line while waiting on slickline.
S of slickline unit.
12:30 - 15:30 3.00 FISH N DPRB WEXIT Hold PJSM with all crews.
RU wireline pressure control equipment.
Bring tools to floor.
Complete rig up with SLB slickline crew. Some SLB hands new
to rig.
15:30 - 17:30 2.00 FISH N DPRB WEXIT Run in hole with 3.0" x 10' flat bottom pump bailer BHA.
17:30 - 18:00 0.50 FISH N DPRB WEXIT alf a cu of lar a steel and brass feces. These
were up to +/- 1" x 1" x 3/8" thick. VeN substantial junk.
18:00 - 18:30 0.50 FISH N DPRB WEXIT Crew changes and PJSM on slick line operations.
18:30 - 19:30 1.00 FISH N DPRB WEXIT RU Second pump bailer run with 3.0" x 10 ft' double mule shoe
bottom.
19:30 - 21:25 1.92 FISH N DPRB WEXIT RIH with second pump bailer
worked bailer, POOH
Recovered less junk but still some large brass peices, and
some steel eices as well.
21:25 - 22:00 0.58 FISH N DPRB WEXIT Change out 3" pump out bailer, to a 3.5" X 10' bailer with a
single sided mule shoe
o-......w. ninnnnnn ~~.cc.ca ewe
BP EXPLORATION Page 10 of 20
Operations Summary Report
Legal Well Name: N-14
Common Well Name: N-14 Spud Date: 8/27/2008
Event Name: REENTER+COMPLETE Start: 8/27/2008 End: 9/22/2008
Contractor Name: NORDIC CALISTA Rig Release: 9/22/2008
Rig Name: NORDIC 2 Rig Number:
Date From - To Hours Task Code NPT Phase Description of Operations
9/10/2008 22:00 - 00:00 2.00 FISH N DPRB WEXIT Make third bailer run with larger bailer.
Work bailer, POOH
9/11/2008 00:00 - 00:30 50
0 FISH N DPRB WEXIT SL #3 R overed more lar a brass ieces and some steel
. ieces. Also recovered one large round steel chunk about 2" in
diameter with small threaded tap on one side with "WS" and
"1270"engraved on surface.
00:30 - 01:15 0.75 FISH N DPRB WEXIT Changed tool configuration from 3.5" X 10 ft to 3.5" X 5 ft.
This should give us a little more suction power.
01:15 - 03:05 1.83 FISH N DPRB WEXIT SL run #4.
Recovered veN little. Few small metallic peices. Most staved
sus ended in the 2 b biozan.
03:05 - 03:40 0.58 FISH N DPRB WEXIT RD pump bailer and RU a LIB to run while waiting on Baker
Thru Tubing.
03:40 - 07:00 3.33 FISH N DPRB WEXIT Run 3.75" LIB on slickline. Tag fish at +/- 9217'.
Pull out of hole.
Good im ression of what looks like the to of the easidrill lu .
Sli ht evidence of additional small 'unk.
07:00 - 09:00 2.00 FISH N DPRB WEXIT Rig down SLB slickline equipment.
09:00 - 10:30 1.50 FISH N DPRB WEXIT MIRU DHD pressure test equipment. Hold PJSM with crew to
discuss OA MIT test.
Pressure OA to 1000 psi w/ diesel. Hold and record for 30
minutes.
10:30 - 11:15 0.75 FISH N DPRB WEXIT MU milling BHA with piranah mill and no string reamer. All left
hand threads.
11:15 - 13:00 1.75 FISH N DPRB WEXIT Run in hole.
13:00 - 14:30 1.50 FISH N DPRB WEXIT Ta fasdril at 9222'.
1900 psi fs at 2.57 bpm in/out.
Mill plu .Push remains to 9505'.
Circulate hi vis sweep.
14:30 - 16:00 1.50 FISH P WEXIT Circulate out of hole.
16:00 - 16:45 0.75 FISH P WEXIT At surface. Get off well. LD piranah mill.
MU 3.79" parabolic 331 with 3.80" string reamer.
Stab coil. Get on well.
16:45 - 18:50 2.08 FISH P WEXIT RIH To mill XN ni le.
Wt check ~ 9200 ft
Up WT=37K dry
Tag ~ 9253 ft. PU to nutral wt. C>~ 9250 and get parameters
Op=2.5 bpm ~ 2050 psi.
18:50 - 21:45 2.92 FISH P WEXIT Time mill XN ni le fr
.01 ft / 3 min.
Pumped 5 bbl sweep ~ 9252 ft.
Stalled ~ 9253 ft.
®9253.2 Cp=2200 psi.
Milled throw h ~ 9254.8 ft. Pass throw h slow-
um in .
PU to 9247 ft SD MP's and RIH dry to 9256.5 ft Turn MP's on
to 2.5 bpm and continue to 9490 ft.
21:45 - 23:50 2.08 FISH P WEXIT POOH chassing last pill to surface.
Pull through milled XN nipple was clean.
23:50 - 00:00 0.17 FISH P WEXIT PJSM while POOH on standing back injector and LD of BHA.
9/12/2008 00:00 - 01:50 1.83 FISH P WEXIT Stand back injector and LD (LH) milling BHA. Rehead with
(RH) BTT CTC. Pull test to 20K and PT to 3500 psi. PJSM on
MU & PU of BHA. PU dummy whipstock BHA. Stab on injector.
.,__._~. ninnMnno ~~.cc.cc ens
BP EXPLORATION Page 11 of 20
Operations Summary Report
Legal Well Name: N-14
Common Well Name: N-14 Spud Date: 8/27/2008
Event Name: REENTER+COMPLETE Start: 8/27/2008 End: 9/22/2008
Contractor Name: NORDIC CALISTA Rig Release: 9/22/2008
Rig Name: NORDIC 2 Rig Number:
Date From - To Haurs Task Code NPT Phase Description of Operations
9/12/2008 00:00 - 01:50 1.83 FISH P WEXIT
01:50 - 04:15 2.42 EVAL P WEXIT 'Qstnrk to 9495 ft,_
Dn WT ~ 9050 ft = 19,700 #'s ~ 22 fpm.
Drift was clean down and up.
04:15 - 06:15 2.00 EVAL P WEXIT POOH pumping 2.5 bpm.
06:15 - 06:45 0.50 STWHIP P WEXIT At surface. Get off well. LD dummy WS BHA.
06:45 - 09:30 2.75 STWHIP P WEXIT RU and reverse circulate slack into reel.
Cut 340' of coil. Test a-line.
MU dimple connector. PuII, pressure, and continuity test
connector.
Install 2 PIP tags in tray.
09:30 - 10:45 1
25 STWHIP P WEXIT MU Baker 4-1/2" mono-bore retr whi stock on Int BHA tools.
. Scribe tray face to HS on orienter.
Stab coil. Test tools. Get on well.
10:45 - 13:00 2.25 STWHIP P WEXIT Run in hole at 60 fpm.
13:00 - 15:00 2.00 STWHIP P WEXIT Log initial GR tie in from 9410'.
Displace coil and well to seawater.
GR too hot for Inteq tools in area of interest.
15:00 - 16:00 1.00 STWHIP P WEXIT Round up more logs from PBOC.
16:00 - 16:30 0.50 STWHIP P WEXIT Log CCL tie in from 9150 to 9480'. Subtract 12' correction.
16:30 - 17:30 1.00 STWHIP P WEXIT Set whi stock to at 9467'. TF to 150R.
Close EDC. Pressure up coil and set whipstock. Sheared at
3400 psi.
Set 31# dn. WS taking weight.
PU. Off whipstock.
17:30 - 19:20 1.83 STWHIP P WEXIT Pull out of hole.
Paint EOP flag at 9200'. (BOP excluded)
19:20 - 19:30 0.17 STWHIP P WEXIT PJSM while POOH on unstabbing and LD of BHA.
19:30 - 19:40 0.17 STWHIP P WEXIT POOH
19:40 - 20:20 0.67 STWHIP P WEXIT Stand back injector and LD Inteq tools.
LD whipstock setting tool. Tool had indication of good clean
set.
Change injector pack offs.
20:20 - 20:25 0.08 STWHIP P WEXIT PJSM on MU of cement nozzle and stabbin injector
20:25 - 20:50 0.42 STWHIP P WEXIT MU cement Nozzle BHA, stab on injector.
20:50 - 23:05 2.25 STWHIP P WEXIT RIH
PJSM with cementers, Spot in cement trucks, RU hard line,
load water, While RIH.
Stop at EOP mark ~ 9200 ft for correction of -14 ft.
Nozzle de th ~ EOP 9221.26
23:05 - 23:20 0.25 STWHIP P WEXIT PJSM with SLB & Nordic crews for cement job.
23:20 - 00:00 0.67 STWHIP P WEXIT By pass "rock catcher"
Pump 5 bbls fresh water.
PT cement lines to 4500 psi.
Pump 8 bbls 15.8 class G cement
Pump 5 bbls fresh water.
Pump 7 bbls KCL water switch to 2ppb biozan. while RIH to
9457 ft.
from 9457 ft. pump 1 bbl cement out nozzle then POOH 1 for 1
at 1 bpm & 66 fpm.
POOH to saftey.
9/13/2008 00:00 - 02:20 2.33 STWHIP P WEXIT POOH to safety ~ 8300 psi. Wait for 30 min for cement to
settle. Slowly pressure up to 1000 si for 30 min. Slowly open
o~.ae,~~ o/3l1M(MIR 11.5468 AM
•
-
BP EXPLORATION Page 12 of 20
Operations Summary Report
Legal Well Name: N-14
Common Well Name: N-14 Spud Date: 8/27/2008
Event Name: REENTER+COMPLETE Start: 8/27/2008 End: 9/22/2008
Contractor Name: NORDIC CALISTA Rig Release: 9/22/2008
Rig Name: NORDIC 2 Rig Number:
Date From - To Hours Task Code NPT Phase Description of Operations
9/13/2008 00:00 - 02:20 2.33 STWHIP P WEXIT choke up to bleed off wellhead press.
RIH to 9457 ~ 40 FPM with Op=3 bpm ~ 2100 psi.
POOH to 8900 ft still pumping 3.0 bpm.
RIH to 9457 ~ 3 bpm.
02:20 - 04:55 2.58 STWHIP P WEXIT POOH pumping 3 bpm.
Slowly reciprocate across jewelry.
04:55 - 05:10 0.25 STWHIP P WEXIT Unstab injector, LD cement nozzle, PU swizzle stick, Stab on
injector.
05:10 - 05:40 0.50 STWHIP P WEXIT Wash out stack with swizzle stick.
05:40 - 05:55 0.25 STWHIP P WEXIT Unstab injector, LD swizzle stick.
05:55 - 07:00 1.08 STWHIP P WEXIT MU window milling BHA on Inteq tools. (3.8" speed mill and
3.8" string mill).
Stab coil. Test tools. Get on well.
07:00 - 11:00 4.00 STWHIP P WEXIT Run in hole slow while waiting on cement.
11:00 - 11:30 0.50 STWHIP P WEXIT Lo CCL tie in from 9150'. Subtract 16' correction.
11:30 - 15:00 3.50 STWHIP P WEXIT 2020 psi fs at 2.53 bpm in/out.
` ~
~i~` Tag cement at 9465'. Tag TOW at 9467.5'
1 ~~~ Begin time milling from 9467.5'.
N DHWOB: 1.0-2.Ok# Mill at 12 minutes per 1/10th initially, then
increase to 6 minutes per 1/10th ft.
Mill to 9469'.
15:00 - 17:00 2.00 STWHIP P WEXIT Mill ahead from 9469'.
Mill at 6 minutes per one-tenth ft. 2010 psi fs at 2.52 bpm
in/out. 100-200 psi mtr work.
DHWOB: 1-2k#.
Metal on magnets.
17:00 - 00:00 7.00 STWHIP P WEXIT Showing lighter WOB for same travel and pump pressures. ~
9470.5
Mill to 9474.2 ft with
DH WOB = 0.08-1.2k#
0=2.53/2.56 bpm
p=2050 - 2150 psi
9/14/2008 00:00 - 04:25 4.42 STWHIP P WEXIT Continue to mill window. ~ 9474 ft change to .5 ft / 6 min.
~ 9474.6 ft
Q=2.52/2.55 bpm
P=2110 psi
DH WOB=710#
Getting P=2150psi when pipe is advanced 0.5 ft
~ 9476.3 ft motor work and DHWOB started to fall off much
faster.
Expected BOW ~ 9476.3
Continue to mill ahead at 0.1 ft / 6 min.
GEO confirmed formation cuttings in bottoms up sample from
9476.4 ft
04:25 - 05:30 1.08 STWHIP P WEXIT From 9467.3 ft drill ahead 10 ft of formation.
~ 9478.5 ft.
OP=2.53/2.59 bpm ~ 2175 psi.
DH WOB=1840#
Delta-P=504 psi.
~ 9481.5 ft DHWOB=2400#'s P=2190 psi.
drilled to 9486 ft
.,__.,... .anninnno ~~.ca.ca enn
~vt~urir~u ~ r
1CTUATOR = C
CB. ELEV = 74
3F.ELEV = 45
COP = 3'
Flax Angle = 130 @ 10.E
)alum MD = 9E
)alum ND = 8800'
DRLG - N-14B
lJ
13-3/8" CSG, 72#, L-80, ID = 12.347" ~ 2678'
Minimum ID = 2.441" @ 9417'
3-112" X 2-7/8" XO
PERFORATION SUMMARY
REF LOG: SWS-MCNL/GR/CCL run 09/20/2008
ANGLE AT TOP PERF: 46 @ 9640'
Note: Refer to Production DB for historical perf data
SIZE SPF INTERVAL Opn/Sqz DATE
2" 6 9640 - 9665 O 09/21108
2" 6 9940 - 9950 O 09/21 /08
2" 4 9965 - 9995 O 09/21 /08
TOP OF 7" LNR I~ 8091'
TOP OF WHIPSTOCK ~ 8277'
9-5/8" CSG, 47#, L-80, ID = 8.681" $277
MILLOUT WINDOW 8277' - 8293'
4 -1 l2" TBG, 12.6#, 13Cr, .0152 bpf, ID = 3.958"
4-1/2" TBG, 12.6#, L-80, .0152 bpf, ID = 3.958" ~~ 9242'
7" LNR, 26#, L-80, .0383 bpf, ID = 6.276" ~~ 9405' ~
4 112" monobore w hipstock 9467'
4 1/2" CIBP 9500'
GAS LIFT MANDRELS
ST MD ND DEV TYPE VLV LATCH PORT DATE
6 3286 3282 13 MMG DMY RK 0 09/08/08
5 4028 3977 26 MMG DMY RK 0 09/06/08
4 5778 5508 34 MMG DMY RK 0 09/06/08
3 7317 6794 31 MMG DMY RK 0 09/06/08
2 8144 7512 29 KBG DMY BK 0 09/06/08
1 8969 8247 25 KBG DMY BK 0 09/06/08
8091' I
9-5/8" X 7" BKR ZXP PKR/HGR, ID = 6.331"
9037' -~4-1/2" HES X NIP, ID = 3.813"
9057' 7" X 4-112" BKR 9Cr PKR, ID = 3.875"
9081' 4-1/2" HES X NIP, ID = 3.813"
9115' TOP 3-112" x 2-7/8" LNR, ID = 2.992"
9186' 7" X 4-1/2" BKR S-3 PKR, ID = 3.875"
9209' 4-1/2" HES X NIP, ID = 3.813"
9230' 4-1 /2" HES XN NIP, ID = 3.75"
9242 4-1/2" WLEG, ID= 3.958"
g247' ELMD TT LOGGED 07/08/98
9237' 7" X 5" BKR ZXP PKR
HGR, ID = 4.375"
9416' 3-1/2" x 2-7/8" XO, ID = 2.441"
PBTD
10085
PBTD 9875'
4-112" LNR, 12.6#, L-80, .0152 bpf, ID = 3.953" 9959' 3-1 '2" '.3Cr x 2-7/8" 13Cr Liner, Cemented & Perf'd 10123'
DATE REV BY COMMENTS DATE REV BY COMMENTS PRUDHOE BAY UNfT
07/26/81 ORIGINAL COMPLETION 09/28/08 TLH CORRECTIONS WELL: N-146
07109198 SIDETRACKCOMPLETION PERMIT No: 1972110
03/08/02 RN/TP CORRECTIONS API No: 50-029-20594-01-02
11/10/02 CAO/KK SET WRP SEC 8, T11N, R13E, 3917' SNL & 4731' WEL
09121/08 NORDIC2 RWO + CTD SIDETRACK (N-14B
SAFETY~TES *** Chrome Tubing ***
2012' I~ 4-1 /2" HES SSSV NIP, ID = 3.813"
06/11/08
Sch~um~er~r
Alaska Data & Consulting Services
2525 Gambell Street, Suite 400
Anchorage, AK 99503-2838
ATTN: Beth
Wcll Jnh ~
~~;N~p JUN ~. ~ 2008
~ n.
NO. 4745
Company: State of Alaska
Alaska Oil & Gas Cons Comm
Attn: Christine Mahnken
333 West 7th Ave, Suite 100
Anchorage, AK 99501
P2-13 11978463 STATIC PRESS & TEMP - 06/03/08 1
12-05A 11963097 MEM PROD PROFILE "J -~ 06/01/08 1
P2-06 12014018 PRESS & TEMP LOG ~} - ~ 06/03/08 1 1
N-14A 12017297 LDL Al .~~) 06/10/08 1 Y
K-12A 11966245 SCMT e1 06/06/08 1 1
06-15 11966256 USIT / j 06/07/08 1 1
A-13 12031481 USIT /~ - G L 06/06/08 1 1
P2-45B 40016680 OH MWD/LWD EDIT ~ - ( ~/ ~ 03/13/08 2 1
~~
. --..-- . •-••••~ ••----- ..-~.... ... v.v..n..a e...v nc. vnnu~q vnc vvr ~ GMVn ~ v.
BP Exploration (Alaska) Inc.
Petrotechnical Data Center LR2-1
900 E. Benson Blvd.
Anchorage, Alaska 99508 -
Date Delivered:
'U^,t?
Alaska Data & Consulting Services
2525 Gambell Street, Su' 400
Anchorage, AK 99503- 38
ATTN: Beth
Received by:
•
•
O..J r_.. r_...,~~ ~ ~ ..
~°y~y ~ ~~
~~,d SARAH PALlN, GOVERNOR
~N~ . -r
c
1~~ r>~t>y7~7~T Ol[L A1~TD rirAS 333 W. 7th AVENUE, SUITE 100
CO1sS~RQA~Oa` CO~SSIOI~ . ,., ANCHORAGE, ALASKA 99501-3539
PHONE (907) 279-1433
FAX (907) 276-7542
Sean McLaughlin
CT Drilling Engineer
BP Exploration Alaska Inc.
PO Box 196612 ~~~A1VN~® MAY 2 ~ 200
Anchorage, AK 99519-6612
Re: Prudhoe Bay Field, Prudhoe Bay Oil Pool, PBU N-14A
Sundry Number: 308-181
t°I ~"
Dear Mr. McLaughlin:
Enclosed is the approved Application for Sundry Approval relating to the
above referenced well. Please note the conditions of approval set out in the
enclosed form.
When providing notice for a representative of the Commission to witness any
required test, contact the Commission's petroleum field inspector at (907)
659-3607 (pager).
As provided in AS 31.05.080, within 20 days after written notice of this
decision, or such further time as the Commission grants for good cause
shown, a person affected by it may file with the Commission an application
for rehearing. A request for rehearing is considered timely if it is received by
4:30 PM on the 23rd day following the date of this letter, or the next working
day if the 23rd day falls on a holiday or weekend. A person may not appeal
a Commission decision to Superior Court unless rehearing has been
requested.
Sincerely,
~4i °`'
Daniel T. Seamount, Jr.
Chair
5 t•
DATED this ? ~ day of May, 2008
Encl.
~/ STATE OF ALASKA
v~~ A~A~A OIL AND GAS CONSERVATION COMMSION MAY 1 6
~~
APPLICATION FOR SUNDRY APPROVica Oil & Gas Cons. om fission
20 AAC 2s.2so ,
1. Type of Request: ®Abandon 1 ^ Suspend ^ Operation Shutdown ^ Perforate ^ Time Extension
^ Alter Casing ^ Repair Well ^ Plug Perforations ^ Stimulate ^ Re-Enter Suspended Well
^ Change Approved Program ^ Pull Tubing ^ Perforate New Pool ^ Waiver ^ Other
2. Operator Name: 4. Current Well Class: 5. Permit To Drill Number
BP Exploration (Alaska) Inc. ®~Development ^ Exploratory 197-211 -
3. Address: ^ Service ^ Stratigraphic 6. API Number: ,
P.O.Box196612,Anchorage,Alaska 99519-6612 50-029-20594-01-00
7. If perforating, closest approach in pool(s) opened by this operation to nearest 8. Well Name and Number:
property line where ownership or landownership changes: PBU N-14A -
Spacing Exception Required? ^ Yes iSI No
9. Property Designation: 10. KB Elevation (ft): 11. Field /Pool(s):
ADL 028282' 74.47' ~ Prudhoe Bay Field / Prudhoe Bay Pool
12. PRESENT WELL CONDITION SUM MARY
Total Depth MD (ft): Total Depth ND (ft): Effective Depth MD (ft): Effective Depth TVD (ft): Plugs (measured): Junk (measured):
9960' ~ 9151' 9875' 9073' 9320' None
Casin Len h Size MD - TVD Burst Colla se
Struct ral
r 2"x 0" 110' 11'
Surface 2678' 13-3/8" 2678' 2678' 4930 2670
Intermedi t 8277' 9-5/8" 8277' 7629' 6870 4760
Pro i
Liner 1315' 7" 8091' - 9406' 7466' - 8642' 7240 5410
Liner 722' 4-1/2" 9237' - 9959' 8489' - 9150' 8430 7500
Perforation Depth MD (ft): Perforation Depth TVD (ft): Tubing Size: Tubing Grade: Tubing MD (ft):
9598' - 9652' 8818' - 8868' 4-1 /2", 12.6# L-80 9242'
Packers and SSSV Type: 7" x 4-1/2" Baker'S-3' packer Packers and SSSV MD (ft): 9186'
13. Attachments: 14. Well Class after proposed work:
® Description Summary of Proposal ^ BOP Sketch
^ Exploratory ®Development ^ Service
^ Detailed Operations Program
15. Estimated Date for 16. Well Status after proposed work:
Commencin O erations: June 15, 2008 ^ Oil ^ Gas ^ Plugged ®Abandoned
17. Verbal Approval: Date: ^ WAG ^ GINJ ^ WINJ ^ WDSPL
Commission Representative:
18. I hereby certify that the foregoing is true and correct to the best of my knowledge. Contact Sean McLaughlin, 564-4387
Printed Name San McLaughl'n Title CT Drilling Engineer
Prepared By NamelNumber:
Signature ~.-, 1 ~ ~. Phone 564-4387 Date 5 (S d~ Terrie Hubble, 564-4628
Commission Use Onl
Sundry Number:
Conditions of approval: Notify Commission so that a representative may witness
^ Plug Integrity `~OP Test ^ Mechanical Integrity Test ^ Location Clearance ~~ ~~~« ~ j ~ ~ ~ ~
Other: ~ ~~Qg \ ~?~ Q ~~5~.
Subsequent Form Required:
APPROVED BY
/
~
A roved B : COMMISSIONER THE COMMISSION Date ! `
Form 10-403 R~e~06/2006 0 R 1 G I N A L ~~" MAY ~ ~ 2oi)~ Submit In Duplicate
To: Tom Maunder
Petroleum Engineer
Alaska Oil & Gas Conservation Commission
From: Sean McLaughlin
CTD Engineer
Date: May 07, 2008
Re: N-14A Sundry Approval
• ~ by
i®P~+~
Sundry approval is requested for well N-14A. The N-14A sidetrack was completed in July 1998. The sidetrack
kicked off in the 9-5/8" casing and a 7" intermediate liner was run to the top of Sag River and completed with
186' liner lap. There was some difficulty cementing the intermediate liner; returns were lost when circulating
pre-cement. To control losses the pump rate was reduced while pumping cement. In the end, 8 bbls of cement
was to circulated above the top of the 7" liner, so the cement job turned out well. A deviated production hole
was drilled (typical GDWFI) and completed with a 4-1/2" liner. The production liner was cemented with 18
barrels of cemented with full returns. The sidetrack was finished off by running 4-1/2" tubing to provide a
monobore completion.
The N-14A production history is characterized by difficulties keeping gas and water isolated. The first problem
occurred in March 2000 when a HCL Perf Wash opened a channel to water. In June 2000, a cement squeeze was
performed for water shutoff purposes. The well was then repeforated and brought back on production but well
tests suggested the well was damaged. An HCL job was pumped in July 2000 in an attempt to remove damage
but it was not successful. More perforations were added in an attempt to re-establish contact with undamaged
reservoir rock. As a last ditch effort, a mud acid job was performed in September 2000. The mud acid
successfully restored oil rate but appeared to partially open the channel to water. Water production was
manageable this time around so the well continued to produce with a moderate water cut. In July 2001, gas rate
jumped up by 50%, which was the first indication that gas was entering the well through holes in the liner. In
April 2002, gas rate jumped again, this time by two-fold. The caliper run into the liner in July 2003 supports the
hypothesis that the gas rate jumps were mechanical in nature. The well is currently secured with an IBP set in
the liner because it does not have tubing integrity. Attempts to secure the well with plugs place in the tailpipe
were unsuccessful due high corrosion in that part of the completion. The production casing passes pressure tests.
REASON FOR RWO and SIDETRACK:
N-14A is shut-in because of compromised tubing integrity. The reservoir is also damaged. Due to the low
remaining value of this well and the lack of wellwork options, the well is recommended for a workover and
coil sidetrack.
The proposed plan for N-14A is to replace the 4-1/2" L-80 production tubing with 4-1/2" Chrome tubing. After
tubing integrity is restored drill a sidetrack with the SLB/Nordic 2 Coiled Tubing Drilling rig on or around
August 15, 2008. The existing perforations will be isolated by a CIBP in the remaining 4-1/2" liner, as well as
the liner cement iob. The sidetrack, N-145B, will exit the existing 4-1/2" liner, kick off in Shublik and drill a
"U" shaped Z4 well. The following describes work planned and is submitted as an attachment to Form 10-403.
A schematic diagram of the proposed sidetrack is attached for reference.
Pre-Rig Work: (scheduled to begin on June 15, 2008)
1. O CMIT-TxIA Passed 03/01/08
2. O Check the tubing hanger and IC casing hanger lock down screws for free movement.
Completely back out and check each lock down screw for breakage (check one at a time).
PPPOT-T & IC.
3. S Pull IBP from 9320'
4. S Run Dummy whipstock drift to 9550'.
5. E Set 4-1/2" CIBP alJO'; CMIT TxIA 3500 psi
6. E Jet cut @ 9145', in the middle of 1st full joint above the packer (Ref: 23-JUN-98 tubing
summary).
7. F Circulate bullhead seawater thru the cut. Bleed WHP's to 0 psi.
8. W PT MV, SV, WV
9. O Blind and bleed lines, remove well house, level pad
~~
~~~
Rig Work: (scheduled to begin on August 15, 2008)
1. MIRU, Set TWC, ND Tree, NU BOPE and test BOPE to 250 psi low and 3500 psi high.
2. Pull 4-1/2" L-80 tubing
3. Replace 9-5/8" packoffs
4. Run 4-1/2" Chrome completion
5. Pull ball and rod and RHC plug
6. Dummy whipstock drift
7. ND BOPE, NU tree and test, NU CT BOPE, test BOPE to 250 psi low and 3500 psi high.
8. Set Baker 4.5" monobore WS w LS orientation @ 9467'
9. Mi113.80" window with KOP at 9467' and 10' of rathole. Swap the well to Flo-Pro.
10. Drill Build: 4.125" OH, 343' (42 deg/100 planned) to a depth of 9810' MD.
11. Drill Lateral: 4.125" OH, 320' (12 deg/ 100 planned) to a depth of 10130' MD.
12. Run 3-1/2" x 2-7/8" chrome solid liner leaving TOL at 9120'
13. Pump primary cement leaving TOC at 9120', 10 bbls of 15.8 ppg liner cmt planned
14. Cleanout liner and MCNL/GR/CCL log
15. Test liner lap to 2000 psi, run LTP if needed.
16. Perforate liner per asset instructions (300')
17. Freeze protect well, install BPV, and RDMO
Post-Rig Work:
1. Remove BPV.
2. Re-install wellhouse and FL's.
3. Test separator (300' of perfs)
Sean
CTD Engineer
564-4387
~~~~~~
CC: Well File
Sondra Stewman/Terrie Hubble
TREE = 6" CM/
WELLHEAD = FMC
ACTUATOR = OTIS
KB ~ELEV = 74.47
BF. ELEV = 45.07
KOP = 3196'
Max Angle = 35 Q 5896'
Datum MD = .9680'
Datum TV D = 8800' SS
13-3/8" CSG, 72#, L-80, ID = 12.347" ~-- j 2678'
Minimum ID = 3.725" @ 9230'
4-1/2" HES XN NIPPLE
TOP OF 7" LNR 8091'
PERFORATION SUMMARY
REF LOG: SWS-BRCS ON 06/18/81
ANGLEAT TOP PERF: 23 Q 9598'
Note: Refer to Production ~ for histor~al perf data
SIZE SPF INTER\/AL Opn/Sqz DATE
2-7/8" 6 9598 - 9602. C 07/25/00
2-7/8" 6 9604 - 9613 C 07/25/00
2-7/8" 4 9616 - 9629 C 06/12/00
2-7/8" 4 9632 -9652 C 06/12/00
~ 9-5/8" CSG, 47#, L-80, ~ = 8.681" i
BRIDGE PLUG
P OF CBMEIJf'
~ N 14A SNOTES:*** LOST WRP SLIP & 2" X 1" X
~ 1 ENT (9/4/OS)*„*
2001' 4-1/2" HES SSSV N~', ~ =3.813"
GAS L9-? MANDRELS
S MD TVD DEV TYPE VLV LATCH PORT DATE
6 3265 3187 13 CAMCO RK
5 .4034. 3907 26 CAMEO RK
4 5799 5451 34 CAMCO RK
3 7311 6714 .31. CAMCO RK
2 8148 7439 29 CAMCO BTM
1 8987 8189 25 CAMEO BTM
9-5/8" X 7" BKR ZXP PKR/FKaR ~ = 6.331"
MILLOUT WINDOW 8277' - 8293'
S' 4-1/2" HES X N~, ID = 3.813"
9186' 7" X M1/2" BKR S-3 PKR ID = 3.875"
9209' ~--r4-112" HES X NIP, O = 3.813"
9230' 4-1/2" HES XN NP, ID = 3.725"
9242' 4.1/2" WIEG ~ = 3.958"
..
9247' ELMD TT LOGGED 07/08/98
9237' 7" X 5" BKR ZXP PKR
HER, ID = 4.375"
\~~ 9320' BKR MP (09/06/05)
OF
4-1/2" 7BG, 12.8#, L-80, .0152 bpf, D = 3.958" H 9242' ~
7" LNR, 26#, L-80, .0383 bpf, ID = 6.276" 9405'
PBTD ~ 987
4-1/2" LNR, 12.6#, L-80, .0152 bpf, ~ _ 3.953"
DATE REV BY OOMMENTS DATE REV BY COMMENTS
07/26/81 ORIGINAL COMPLETION. 09/06/05 GJBlTLH WRPPULL®! IBPSET
07/09198 SIDETRAGKCOMPLEiION
03/08102 RNfTP CORRECTIONS
11/10/02 CAO/KK SET WRP
08/16/03 (3~A0/TLP KB ELEVAT~N & MAX ANGLE
09/04/05 DAV/PJC SAFETY NOTE
PRUDHOE BAY UNIT
WELL: N-14A
PERMR No; 1972110
API No: 50-029-20594-01
SEC 8, T11 N, R13E, 391 T SNL & 4731' WEL
BP Exploration (Alaska)
WELLHEAD = FMC
ACTUATOR"= OTIS
KB..EL~/ = 74.47'
BF. ELEV = 45.07'
KOP = 3196'
Max Angle = 35 @ 5896'
Datum MD = 9660'
Datum TVD = 8800' SS
N-14B
i~iosed RW O/CTD Sidetrack
~J
13-3/8" CSG, 72#, L-80, ID = 12.347" ~ 2678'
Minimum ID = 3.725" @ 9230'
4-1 /2" HES XN NIPPLE
PERFORATION SUMMARY
REF LOG: SWS-BHCS ON 06/18/81
ANGLE AT TOP PERF: 23 @ 9598'
Note: Refer to Production DB for historical perf data
SIZE SPF INTERVAL Opn/Sqz DATE
2-7/8" 6 9598 - 9602 C 07/25/00
2-7/8" 6 9604 - 9613 C 07/25/00
2-7/8" 4 9616 - 9629 C 06/12/00
2-718" 4 9632 - 9652 C 06/12/00
TOP OF 7" LNR H 8091'
ITOPOFWHIPSTOCK I $277'
9-5/8" CSG, 47#, L-80, ID = 8.681" $277'
MILLOUT WINDOW 8277' - 8293' ,
4-1/2" TBG, 12.6#, 13Cr, .0152 bpf, ID = 3.958" ~ 9145'
4-1/2" TBG, 12.6#, L-80, .0152 bpf, ID = 3.958" ~9i
7" LNR, 26#, L-80, .0383 bpf, ID = 6.276" ~ 9405'
4 1/2" monobore w hipstock 9467'
4 1/2" CIBP 9500'
PBTD 9875'
4-1/2" LNR, 12.6#, L-80, .0152 bpf, ID = 3.953" 9959'
(9/4/05)***
SLIP&2"X1"X
2001' ~-{ 4-1 /2" X NIP, ID = 3.813"
GAS LIFT MANDRELS
ST MD TVD DEV TYPE VLV LATCH PORT DATE
6 3265 3187 13 CAMCO RK
5 4034 3907 26 CAMCO RK
4 5799 5451 34 CAMCO RK
3 7311 6714 31 CA MCO RK
2 8146 7439 29 CAMCO BTM
1 8987 8189 25 CA MCO BTM
8091' I-~ 9-5/8" X 7" BKR ZXP PKR/HGR, ID = 6.331 "
9035' ~4-1/2" HES X NIP, ID = 3.813" I
9065' 7" X 4-1 /2" BKR S-3 PKR, ID = 3.875"
9095' 4-1 /2" HES X NIP, ID = 3.813"
9120' TOP3-1/2" x 2-7/8" LINER
9186'
9209' 7" X 4-1 /2" BKR S-3 PKR, ID = 3.875"
4-1/2" HES X NIP, ID = 3.813",
9230' 4-1/2" HES XN NIP, ID milled to = 3.80"
9242' 4-1/2" WLEG, ID = 3.958"
9247' ELMD TT LOGGED 07/08/98
9237' 7" X 5" BKR ZXP PKR
HGR, ID = 4.375"
9440' 3-1/2" x 2-7/8" crossover
~ 10090' ~
13Cr x 2-7/8" 13Cr Liner, Cemented 8 Perf'd ~-i 10130'
DATE REV BY COMMENTS DATE REV BY COMMENTS
07/26/81 ORIGINAL COMPLETION 09/06/05 GJB/TLH WRP PULLED / IBP SET
07/09/98 SIDETRACK COM PLETION 04/23/08 MSE PROPOSED CTD ST
03/08/02 RN/TP CORRECTIONS
11/10/02 CAO/KK SET WRP
08/16/03 CMO/TLP KB ELEVATION & MAX ANGLE
09/04/05 DAV/PJC SAFETY NOTE
PRUDHOE BAY UNIT
WELL: N-146
PERMff No:
API No: 50-029-20594-02
SEC 8, T11 N, R13E, 3917' SNL & 4731' WEL
BP Exploration (Alaska)
~chl~mber~er
Alaska Data & Consulting Services
2525 Gambell Street, Suite 400
Anchorage, AK 99503-2838
ATTN: Beth
\A/..11 Ir~h A
_,,,1
( ,
~~"~ App ~ ~ 200
1 .,,, np~~.~.,r~.,.,
NO.4645
Company: State of Alaska
Alaska Oil & Gas Cons Comm
Attn: Christine Mahnken
333 West 7th Ave, Suite 100
Anchorage, AK 99501
Field: P.Bay,Endicott,Borealis
Harp at rah. cn
03/28/08
V-220 12031459 USIT O ( 03/07!08 1 1
N-14A 12066514 RST 03/15/08 1 1
Z-112P61 40016350 OH MWD/LWD EDIT ~ ~_) 01/29/08 2 1
PLEASE ACKNOWLEDGE RECEIPT BY SIGNING AND RETURNING ONE COPY EACH TO:
BP Exploration (Alaska) Inc. Alaska Data & Consulting Servic
Petrotechnical Data Center LR2-1 2525 Gambell Street, Suite 4
900 E. Benson Blvd. Anchorage, AK ~51~3-2838
Anchorage, Alaska 99508 ATTN: Beth
Date Delivered:
i _ 1,,
Received by: ~~ y / `,--~---'
•
,.i
Schlumberger
Alaska Data & Consulting Services
2525 Gambell Street, Suite 400
Anchorage, AK 99503-2838
ATTN: Beth
Well
NK-20
P2-34
N-14A
4-38/K-34
B-19A
15-31B
MPF-89
OS 16-01
OS 16-15
OS 09-10
M-30
BP Exploration (Alaska) Inc.
Petrotechnical Data Center LR2-1
900 E. Benson Blvd.
Anchorage, Alaska 99508
Date Delivered:
Job#
10889223
11072853
10991753
10933591
11058502
10942223
11132060
10980601
10980599
11058237
11072877
I ~
Log Description
Date
03/21/05
06/05/05
01/22/05
10/29/04
05/06/05
07/16/05
10/08/05
08/15/05
08/13/05
08/16/05
08/04/05
PPROF W/DEFT
TEMPERATURE PRESSURE LOG
LDL
PPROF W/DEFT/GHOST
RST
MCNL
SCMT (PDC-GR)
INJECTION PROFILE
PPROF WIDEFT
INJECTION PROFILE
INJECTION PROFILE
~NED NO\! 0 2 2005
Di-~~
NO. 3503
10/18/05
Company: State of Alaska
Alaska Oil & Gas Cons Comm
Attn: Helen Warman
333 West 7th Ave, Suite 100
Anchorage, AK 99501
Field: Prudhoe Bay
BL
1
1
1
1
1
1
Color
1
1
1
1
CD
-/
~
Alaska Data & Consulting Services
2525 Gambell Street, u· e 400
Anchorage, AK 9 - 38
ATTN: Beth
Received by:
I
eJ.J
{èt7-).1t H'lL
HI::CEiVED
STATE OF ALASKA - OCT A 2005
ALA~ ) OIL AND GAS CONSERVATION COMfv. liON I \1
REPORT OF SUNDRY WELL OPERATIONika Oil & Gas Cons. Commission
1. Operations Abandon D Repair Well D Plug Perforations [] Stimulate D OthAlJ1éfibfanø
Performed: Alter Casing D Pull Tubing D Perforate New Pool D Waiver D Time Extension D
Change Approved Program D Operat. Shutdown D Perforate D Re-enter Suspended Well D
2. Operator BP Exploration (Alaska), Inc. 4. Current Well Class: 5. Permit to Drill Number:
Name: Development r;?' Exploratory 197-2110
3. Address: P.O. Box 196612 Stratigraphic Service 6. API Number:
Anchorage, AK 99519-6612 50-029-20594-01-00
7. KB Elevation (ft): 9. Well Name and Number:
74.47 KB
N-14A
ADl-028282
11. Present Well Condition Summary:
10. Field/Pool(s):
PRUDHOE BAY Field/ PRUDHOE Oil Pool
8. Property Designation:
Total Depth
measured 9960
true vertical 9151.13
feet
feet
Plugs (measured)
Junk (measured)
9320
None
Effective Depth
measured 9875
true vertical 9073.03
feet
feet
Casing
Conductor
Surface
Production
Liner
Liner
length Size MD TVD Burst Collapse
80 20" 91.5# H-40 30 - 110 30 - 11 0 1490 470
2649 13-3/8" 72# l-80 29 - 2678 29 - 2677.94 4930 2670
8249 9-5/8" 47# l-80 28 - 8277 28 - 7628.92 6870 4760
1314 7" 26# l-80 8091 - 9405 7465.57 - 8641.12 7240 5410
723 4-1/2" 12.6# l-80 9237 - 9960 8489.34 - 9151.13 8430 7500
Perforation depth: Measured depth: -=-
True Vertical depth: -=-
-
-
-5CANNE~) NOV () 8 2.005
-
-
Tubing: (size, grade, and measured depth)
4-1/2" 12.6#
l-80
27 - 9242
Packers and SSSV (type and measured depth)
4-1/2" Baker S-3 Perm Packer
5" Baker ZXP Top Packer
9186
9237
12. Stimulation or cement squeeze summary:
Intervals treated (measured):
[RBDMS BFl 0 CT ] ]. 2005
Treatment descriptions including volumes used and final pressure:
Oil-Bbl
Representative Daily Average Production or Injection Data
Gas-Mcf I Water-Bbl I Casing Pressure
SHUT - IN
SHUT - IN
15. Well Class after proposed work:
Exploratory r Development ¡;¡
16. Well Status after proposed work:
Oil P Gas r WAGr GINJ r
Tubing pressure
13.
Prior to well operation:
Subsequent to operation:
14. Attachments:
Copies of logs and Surveys Run
Daily Report of Well Operations
Service r
x
WINJ r WDSPL r
17. I hereby certify that the foregoing is true and correct to the best of my knowledge.
Sundry Number or N/A if C.O. Exempt:
N/A
Contact Sharmaine Vestal
Signat~~
¿
Title Data Mgmt Engr
Printed Name Sharmaine Vestal
Phone 564-4424
Date 9/29/2005
Form 10-404 Revised 04/2004
r ¡--
I: I
Submit Original Only
)
)
N-14A
DESCRIPTION OF WORK COMPLETED
NRWO OPERATIONS
EVENT SUMMARY
I ACTIVITYDATE I SUMMARY
9/3/2005 *** WELL SHUT IN ON ARRIVAL ***
RIH WI 3.70" GAUGE RING TO WRP PLUG @ 9402' SLM. JOB IN
PROGRESS
***CONTINUED ON 9-4-05 WSR***
9/4/2005 *** JOB CONTINUED FROM 9-3-05 *** (pul wfd wrp plug)
PULLED 4 1/2" WFD WRP PLUG @ 9402' SLM. (PLUG IS MISSING 1 SLIP
AND 2 1/2 ELEMENTS) DRIFT TUBING WI 2.70" CENT I BRUSH TO 9500'
SLM. RAN 3.50" G. RING TO 9500' SLM.
*** LEFT WELL SHUT IN ***
9/6/2005 TIO= 1550/1350/50. TBG FL (pre - IBP). TBG FL @ 4760' (73 bbls), IA FL @
4034' sta # 5 (216 bbls), OA FL near surface. AIL is blinded. 2" intregal
installed on IA.
9/6/2005 SET BAKER 3 3/8" IBP AT 9320',1.75 EXTERNAL FISHING NECK, 1840#
DOWN TO EQUALIZE, 5500# TO PULL RELEASE *** JOB COMPLETE***
9/6/2005 TIIIO = 1550/1400/100. Assist E-Line. Set IBP. eMIT TxlA to 3500 psi.
***WSR continues on 09/07/05***
9/7/2005 T/I/O= 1120/1640/100. CMIT-TxIA to 3500 psi. FAILED 4 attempts. LLRT=
1.68 GPM (estimated). Pumped 118 bbls of 120* F crude to achieve test
pressure. Well showed stabilization between tests 3 and 4. TBG lost 40 psi; IA
lost 60 psi I 1st 15 min. TBG lost 40 psi; IA lost 40 psi I 2nd 15 min. MIT-OA
to 2000 psi. PASSED on the second attempt. Pumped 1.5 bbls to achieve test
pressure. Lost 60 psi I 1 st 15 min. and 20 psi 12nd 15 min. for a total of 80 psi
during the 30 minute test. Final WHP= 1760/1780/40.
9/10/2005 T/I/O= 1850/1800/50. Temp= SI. T, lA, & OA FL's, (pre-eMIT for RWO
screen). Tubing FL @ 1398' (21 bbls). IA FL @ 1326' (71 bbls). OA FL near
surface. 2" integral installed on IA. AIL line SI and blinded.
9/15/2005 T/l/O=1800/1800/50, Temp=SI. Bleed TBG & IA < 300 psi (pre-eMIT for RWO
screen). AIL blinded at casing valve, 0 psi. Initial TBG FL @ 1608' (25bbls),
IA FL @ 1368' (73 bbls). Bleed lAP from 1800 psi to 730 psi in 2 hrs. TBGP
tracked with lAP, bled TBGP from 1200 psi to 690 psi in 1 hrs 45 min. TBG &
IA FL came to surface. Shut in bleed and monitor for 20 min, TBGP increased
100 psi to 790 psi, lAP increased 20 psi to 750 psi. FWHP= 790/750/50.
FLUIDS PUMPED
BBLS
1 Diesel
75 Crude
76 TOTAL
THE MATERIAL UNDER THIS COVER HAS BEEN
ON OR BEFO
PL
E
C :LOP, ItA~ILM. DOC
IA L W
~ UNDER
TH IS M ARK ER
Well Compliance Report
File on Left side of folder
197-211-0 PRUDHOE BAY UNIT N-14A 50- 029-20594-01 BP EXPLORATION (ALASK
MD 929_60~ TVD 1J~150 Completion Date: /98 Completed Status: 1-OIL Current:
Microfilm Roll / - Roll 2 /
Name
C 9625
L BHCS
L CN/JWL
L EXSV BRIDGE
L GR/RES-MD
L GR/RES-TVD
Interval Sent Received T/C/D
~ SCHLUM RST '~/~/~--CH ............................... 6,9,00 6,13,00
~I~9414-9927 {~/Zl "~ OH 11/23/98 11/6/98
q~ 9240-9847 r~[~/~'~ CH 5 11/19/98 11/20/98
b~AL 0310-8450 (O[~[C[~ CH 5 0/20/98 8/27/98
~I~NNAL 8350-9900 [~/Iq>lq~-- ~/21/~ OH 1211/98 12/3/98 T
~ 7700-9100 X~' OH 12/1/98 12/3/98
L INJP
L PERF
L PEX-3DD/CN
L PEX-AIT
L PEX-AZLL
L PEX-CN
L PEX-MCFL
L PROD-SPIN/TEM
L RFT
L RST
FINAL 12250-12565 CH 5
e..J~L 9150-9822 Ct J~7 !atq~¢ CH 5
~41q'AL 9414-9945 ~ OH
~AL 9414-9955 OH
~NAL 9414-9950 OH
~~ 9414-9932 OH
~L 9414-9945 ~]~1/~ OH
~ PRES 0-9750 ~IZG/q~ CH 5
~L 9406-9532 ~[~l[q~ OH
~L 9300-9813 3/22/00 CH 5
L RST-A ~ 0-9400 ~1~[~ CH 5
L SSTVD-AIT/MCFL/ ~L CN 9414-9955 ~/¢~[~ OH
L SSTVD-HALS/BHC ~L 9414-9950 ~ OH
L USIT ~ BL(C)9240-9847 ~t~[~ ~ CH 6
R SRVY RPT ~LUM 8290.1-9960. OH
T 8647 ~ SCHLUM RST CH
9/23~98 9/24~98
8/20~98 8/27/98
11/23/98 11/6/98
11/23/98 11/6/98
11/23/98 11/6/98
11/23/98 11/6/98
11/23/98 11/6/98
9/23/98 9/24/98
11/23/98 11/6/98
6/9/00 6/13/00
11/19/98 11/20/98
11/23/98 11/6/98
11/23/98 11/6/98
11/19/98 11/20/98
8/5/98 8/6/98
11/19/98 11/20/98
T 8648
T 8921
T 8941
CI~ SCHLUM CNTG CH
'4/ SCHLUM AIT/CN/SDN/BHC/DLL OH
Dt~ SCHLUM GR-IMP OH
11/19/98 11/20/98
11/23/98 11/6/98
12/1/98 12/3/98
Tuesday, August 01,2000 Page 1 of 2
Was the well cored? yes ~
Comments:
Are Dry Ditch Samples Required? yes
Analysis Description
And Rece~
Tuesday, August 01, 2000 Page 2 of 2
6/9/00
Schlumberger
GeoQuest
3940 Arctic Blvd, Suite 300
Anchorage, AK 99503-5711
ATTN: Sherrie
NO. 234
Company:
Field:
Alaska Oil & Gas Cons Comm
Attn: Lori Taylor
3001 Porcupine Drive
Anchorage, AK 99501
Prudhoe Bay (Cased Hole)
lbo .ooG-
I'3q
i %%.,0"10
L ~ q. oT..%
~lq-D, lt
Well Job # Log Description Date Blueline Sepia Color CD
Prints
D-03 LEAK DETECTION LOG 000525 1 1
H-25 PRODUCTION PROFILE 000518 1 1
H-25 PROD PROFILE/DEFT IMAGES 000518 1 1
H-26 PRODUCTION PROFILE/DEFT 000520 1 1
H-26 PROD PROFILE/DEFT IMAGES 000520 1 1
X-01 PRODUCTION PROFILE/DEFT 000428 1 1
X-28 uL~C. INJECTION PROFILE 000601 1 1
Y-10 ~V INJECTION PROFILE 000531 1 1
A-02 ~ C{ (e"/..,t,~ 20140 EST 000320 1 1 1
A-24 .iA. O~f~ '?,,,"~. 20185 CNTD 000421 1 1 1
N-07 -}:1; ~14~- 7... 20142 CNTD 000326 1 1 1
N-14A .~ ~'[~.~' 20143 RST 000322 1 1 1
-
PLEASE ACKNOWLEDGE RECEIPT BY SIGNING AND RETURNING ONE COPY EACH TO:
BP Exploration (Alaska) Inc.
Petrotectnical Data Center MB3-3
900 E. Benson Blvd.
Anchorage, Alaska 99519-6612
Date Delivered:
RECEIVED
JUN 1 ?.000
Alaska Oil & Gas Cons. commission
Anchorage
Schlumberger GeoQuest
3940 Arctic Blvd, Suite 300
Anchorage, AK/~u3-,b/I I .... _
A1ZN'. Sherr~.~:~ ,~ ~~~,~
Received b¥."7--'- '' I ---'-' :~ '-"--' /
GeoQuest
3940 Arctic Blvd
Anchorage, AK 99503
ATTN: Sherrle
NO. 12076
Company
Field:
Alaska Oil & Gas Cons Corem
Attn: Lorl Taylor
3001 Porcupine Drive
Anchorage, AK 99501
Prudhoe Bay (Cased Hole)
11/19/98
Well Job # Log Description Date BL Sepia LIS Tape
N-14A ~ ~(_~ 98594 RST-A SIGMA 980826 1 1 1
N-14A ~ ~ Lo ~-~ 98595 CNTG 980708 1 1 1
N-14A 98596 USIT 980708 i Color
Print
, ,,
, , ,
PLEASE ACKNOWLEDGE RECEIPT BY SIGNING AND RETURNING ONE COPY EACH TO:
BP Exploration (Alaska) Inc.
Petrotectnical Data Center MB3L3
900 E. Benson Blvd.
Anchorage, Alaska 99519-6612
Date Delivered:
RECEIVED
Schlumberger GeoQuest
3940 Arctic Blvd
Anchorage,
ATTN: Sherrl,~'~- Ir, ~ ,~ -'"'
GeoQuest
3940 Arctic Bird
Anchorage, AK 99503
ATTN: Sherrie
NO. 12084
Company
Alaska Oil & Gas Cons Comm
Altn: Lori Taylor
3001 Porcupine Drive
Anchorage, AK 99501
Field: Prudhoe Bay (Open Hole)
LIS
Well Job # Log Description Date BL Sepia Tape
N-14A ~ ~,~ ¢~,,.~ 98587 PEX-AIT/CNT/SDN/BCS/DLL 980621 1
N-14A 98587 PEX-AIT 980621 1 1
N-14A 98587 PEX-CNL 980621 1 1
N-14A 98587 PEX-3 DET DEN/CNL 980621 ! 1
'N-14A 98587 PEX-AZIMUTHAL LATERLOG 980621 1 1
N-14A 98587 PEX-MCFL 980621 1 1
N-14A 98587 BHC 980621 1 1
N-14A 98587 SSTVD-AIT/TLD/MCFL/CNL/GR 980621 1 1
N-14A 98587 SSTVD-HALS/BHC/GR 980621 1 1
N-14A 98587 RFT 980621 1 1
PLEASE ACKNOWLEDGE RECEIPT BY SIGNING AND RETURNING ONE COPY EACH TO:
11/23/98
BP Exploration (Alaska) Inc.
Petrotectnical Data Center MB3-3
900 E. Benson Blvd.
Anchorage, Alaska 99519-6612
Date Delivered:
Schlumberger GeoQuest
3940 Arctic BIvd
,~n:Nh: °rs~gee' AKrrie
Rece,ve~~~~'/~~'~:~
GeoQuest
500 W. International Airport Road
Anchorage, AK 99518-1199
ATTN: Sherrie
NO. 11506
Company:
Field:
Alaska Oil & Gas Cons Comm
Attn: Lori Taylor
3001 Porcupine Drive
Anchorage, AK 99501
Prudhoe Bay (Cased Hole)
9/23/98
Well Job # Log Description Date BL RF Sepia LIS Tape
G-21 PRODUCTION PROFILE 9 80906 I 1
G-26A RFT 980905 I 1
J-22 STATIC SURVEYS 980 918 1 1
M- 08 PRODUCTION PROFILEr GLS 9 80830 I 1
M- 08 GHOST/PSP 9 80831 I 1
M-08 PROD. PROFILE W/DEFT & GHOST 9 80 831 1 1
M-08 DEFT IMAGES 9 80831 I 1
M-34 PRODUCTION PROFILE 980819 1 1
M-34 DEFT 98081 9 I 1
N-9 N-9 980913 I 1
N-14A PRODUCTION PROFILE 980826 I 1
W-03 A INJECTION PROFILE 9 80904 I 1
X-01 '79' O '~- ~ PRODUCTION LOG~STATIC PRESS/TEMP 980910 I I "~' '
X-04 PRODUCTION LOG~STATIC PRESS/TEMP 980910 I 1
Z-08A GAS LIFT SURVEY 9 80919 I 1
Z-08A PRODUCTION PROFILE 980919 1 I
....
,r
q'-t. 13'5
db. o-'F't
PLEASE ACKNOWLEDGE RECEIPT BY SIGNING AND RETURNING ONE COPY EACH TO:
BP Exploration (Alaska) Inc.
Petrotectnical Data Center MB3-3
900 E. Benson Blvd.
Anchorage, Alaska 99519-6612
Date Delivered:
RECEIVED
SEP 2 4 1998
,,~=r,,=,,.,,, & G~ nr,n~
Anchorsge
Schlumberger GeoQuest
500 W. International Airport Road
Anchorage, Alaska 99618-1199
Received
STATE OF ALASKA ..... :.-,
ALASKA OIL AND GAS CONSERVATION COMMISSION
WELL COMPLETION OR RECOMPLETION REPORT AND LOG
1. Status of Well Classification of Service Well
[~ Oil 1~ Gas I-~ Suspended [--] Abandoned I--I Service
2. Name of Operator i7. Permit Number
BP Exploration (Alaska)Inc. 97-211
3. Address 8. APl Number
P.O. Box 196612, Anchorage, Alaska 99519-6612 ~ ................ _.~.~. 50-029-20594-01
4. Location ofwell at surface
.... ! ' 9. Unit or Lease Name
~ ~, ~~ Prudhoe Bay Unit
3917' SNL, 4731' WEE, SEC. 08, T11N, R13E, UPM
, 10. Well Number
At top of productive interval
1475' SNL, 3389' WEL, SEC. 08, T11N, R13E, UPM .__.~_~_ ..... t 11. Field and Pool
N-1
4A
At total depth
1328' SNL, 3474' WEL, SEC. 08, T11N, R13E, UPM PrudhoeBay Field/Prudhoe Bay
5. Elevation in feet (indicate KB, DF, etc.) 16. Lease Designation and Serial No. Pool
KBE = 74.47'J ADL 028282
12. Date Spudded 113. Date T.D. Reached I 14. Date Comp., Susp., or Aband.115. Water depth, if offshore i16. No. of Completions
6/16/98 6/21/98 7/9/98 N/A MSLI One
17. Total Depth (MD+TVD) 118. Plug Back Depth (MD+TVD)I19. Directional Survey 120. Depth where SSSV set 121. Thickness of Permafrost
9960 9150 FTI 9875 9072 FTI [~Yes I-qNot (Nipple) 2001' MDI 1900' (Approx.)
22. Type Electric or Other Logs Run
MWD, GR, DIP, RES/ALT, DT/BHC, CNL, LDL, GR, Caliper, SP, MRES
23. CASING~ LINER AND CEMENTING RECORD
CASING SETTING DEPTH HOLE
SIZE WT. PER FT. GRADE TOP BOTTOM SIZE CEMENTING RECORD AMOUNT PULLED
20"x 30" Insulated Conductor Surface 110' 36" 8 cu yds concrete
13-3/8" 72# L-80 Surface 2678' 17-1/2" 3720 cuft Permafrost II
9~5/8" 47# L-80 Surface 8277' 12-1/4" 1300 cuft 'G', 130 cuft PF 'C'
7" 26# L-80 8091' 9406' 8-1/2" 331 cuft Class 'G'
4-1/2" 12.6# L-80 9237' 9959' 6" 101 cuft Class 'G'
24. Perforations open to Production (MD+TVD of Top and 25. TUBING RECORD
Bottom and interval, size and number) SiZE DEPTH SET (MD) PACKER SET (MD)
2-7/8" Gun Diameter, 6 spf 2-7/8" Gun Diameter, 1 spf 4-1/2", 12.6#, L-80 9242' 9186'
MD TVD MD TVD
9598' - 9602' 8817' - 8821' 9650' - 9652' 8865' - 8867'
26. ACID, FRACTURE, CEMENT SQUEEZE, ETC.
DEPTH INTERVAL (MD) AMOUNT & KIND OF MATERIAL USED
Freeze Protect wit~l ~ ,~b~ ~f~Dj~es,,el~
t; UG 06' 1998
27. PRODUCTION TEST
Date First Production I Method of Operation (Flowing, gas lift, etc.) i ' I ~ ka 0ii & Sas Cons. O0mmissi0
July 10, 1998
Date of Test Hours Tested PRODUCTION FOR OIL-BBL GAS-MCF WATER-13BL CHOKE SIZE I GAS-OIL RATIO
TEST PERIOD
!
Flow Tubing Casing Pressure CALCULATED OIL-BBL GAS-MCF WATER-BBL O~L GRAWTY-API (CORR)
Press. 24-HOUR RATE
,,,
28. CORE DATA
,
Brief description of lithology, porosity, fractures, apparent dips and presence of oil, gas or water. Submit core chipsl
Form 10-407 Rev. 07-01-80 Submit In Duplicate
29. Geologic Markers 30. Formation Tests
Measured True Vertical Include interval tested, pressure data, all fluids
Marker Name Depth Depth recovered and gravity, GOR, and time of each phase.
Sag River 9389' 8626'
Shublik 9427' 8660'
Sadlerochit 9523' 8748'
31. List of Attachments
Summary of Daily Drilling Reports, Surveys
32. I hereby certify that the foregoi~nd correct to the best of my knowledge
Signed ~'"~'- ~' '~'"~'~~
Dan Stone Title Engineering Supervisor Date
N-14A 97-211 Prepared By Name/Number: Terrie Hubble, 564-4628
Well Number Permit No. / Approval No.
J NSTRUCTIONS
GENERA': This form is designed for submitting a complete and correct well completion report and log on all types of lands and
leases in Alaska.
ITEM 1: Classification of Service Wells: Gas injection, water injection, steam injection, air injection, salt water disposal, water
supply for injection, observation, injection for in-situ combustion.
ITEM 5: Indicate which elevation is used as reference (where not otherwise shown) for depth measurements given in other spaces
on this form and in any attachments.
ITEM 16 AND 24: If this well is completed for separate production from more than one interval (multiple completion), so state in item
16, and in item 24 show the producing intervals for only the interval reported in item 27. Submit a separate form for each additional
interval to be separately produced, showing the data pertinent to such interval.
ITEM 21: Indicate whether from ground level (GL) or other elevation (DF, KB, etc.).
ITEM 23: Attached supplemental records for this well should show the details of any multiple stage cementing and the location of
the cementing tool.
ITEM 21: Method of Operation: Flowing, Gas Lift, Rod Pump, Hydraulic Pump, Submersible, Water Injection, Gas Injection, Shut-In,
Other-explain.
ITEM 28: If no cores taken, indicate 'none'.
Form 10-407 Rev. 07-01-80
Progress Report
Facility PB N Pad
Well N-14A Page 1
Rig Nabors 2ES Date 21 July 98
Date/Time
07 Jun 98 12:00-12:30
12:30-13:30
13:30-16:30
16:30-18:30
18:30-21:00
21:00-22:30
22:30-00:00
08 Jun 98 00:00-00:30
00:30-02:00
02:00-03:30
03:30-06:00
06:00-12:00
12:00-12:30
12:30-18:00
18:00-22:30
22:30-00:00
09 Jun 98 00:00-00:30
00:30-01:30
01:30-02:30
02:30-03:30
03:30-04:30
04:30-06:00
06:00-12:00
12:00-12:30
12:30-14:00
14:00-16:00
16:00-19:00
19:00-19:30
19:30-22:00
22:00-00:00
10 Jun 98 00:00-00:30
00:30-02:00
02:00-03:30
03:30-04:00
04:00-05:00
05:00-06:00
06:00-07:30
07:30-08:00
08:00-09:00
09:00-10:30
10:30-11:30
11:30-12:00
12:00-13:30
13:30-14:30
14:30-16:00
16:00-17:00
17:00-18:00
18:00-19:00
19:00-19:30
19:30-20:00
20:00-22:30
22:30-00:00
11 Jun 98 00:00-01:00
01:00-02:00
Duration
1/2 hr
lhr
3hr
2hr
2-1/2 hr
1-1/2 hr
1-1/2 hr
1/2 hr
1-1/2 hr
1-1/2 hr
2-1/2 hr
6hr
1/2 hr
5-1/2 hr
4-1/2 hr
1-1/2 hr
1/2 hr
lhr
lhr
lhr
1 hr
1-1/2 hr
6hr
1/2 hr
1-1/2 hr
2hr
3hr
1/2 hr
2-1/2 hr
2 hr
1/2 hr
1-1/2 hr
1-1/2 hr
1/2 hr
lhr
lhr
1-1/2 hr
1/2 hr
lhr
1-1/2 hr
lhr
1/2 hr
1-1/2 hr
1 hr
1-1/2 hr
1 hr
lhr
lhr
1/2 hr
1/2 hr
2-1/2 hr
1-1/2 hr
lhr
lhr
Activity
Held safety meeting
Fill pits with Seawater
Reverse circulated at 0.0 ft
Rigged down Surface tree
Rigged up BOP stack
Tested BOP stack
Serviced BOP stack
Held safety meeting
Serviced BOP stack
Tested BOP stack
Serviced BOP stack
Serviced BOP stack (cont...)
Held safety meeting
Serviced BOP stack
Tested BOP stack
Reverse circulated at 8723.0 ft
·
Held safety meeting
Circulated at 8723.0 ft
Retrieved Tubing hanger
Circulated at 8723.0 ft
Removed Tubing hanger
Laid down Tubing of 500.0 ft
Laid down 6000.0 ft of Tubing (cont...)
Held safety meeting
Laid down 2300.0 ft of Tubing
Conducted electric cable operations
Conducted electric cable operations
Tested Casing - Via string
Installed Casing cutter
Installed PBR dress mill
Held safety meeting
Installed Casing cutter
Installed Other sub-surface equipment
Circulated at 310.0 ft
Retrieved Casing hanger
Laid down 300.0 ft of Casing
Laid down 276.4 ft of Casing
Rigged down Casing handling equipment
Rigged up sub-surface equipment - Casing scraper
Ran Drillpipe to 31.6 ft (5in OD)
Serviced Block line
Rigged up sub-surface equipment - Other sub-surface equipment
Ran Drillpipe to 32.0 ft (5in OD)
Tested Casing
Rigged up sub-surface equipment - Other sub-surface equipment
Rigged up sub-surface equipment - Casing scraper
Rigged up sub-surface equipment - Other sub-surface equipment
Rigged up sub-surface equipment - Casing scraper
Circulated at 310.0 ft
Pulled out of hole to 0.0 ft
Rigged up sub-surface equipment - Retrievable packer
Rigged down BOP stack
Removed Tubing head spool
Rigged up sub-surface equipment - Other sub-surface equipment
Progress Report
Facility PB N Pad
Well N-14A Page 2
Rig Nabors 2ES Date 21 July 98
Date/Time
02:00-06:00
06:00-09:30
09:30-10:30
10:30-14:30
14:30-18:30
18:30-20:30
20:30-00:00
12 Jun 98 00:00-01:00
01:00-06:00
06:00-12:00
12:00-13:30
13:30-15:30
15:30-17:30
17:30-18:30
18:30-20:00
20:00-22:30
22:30-02:30
13 Jun 98 02:30-05:30
05:30-06:00
06:00-08:00
08:00-08:30
08:30-13:00
13:00-16:30
16:30-17:30
17:30-23:30
23:30-01:30
14 Jun 98 01:30-05:30
05:30-06:00
06:00-08:00
08:00-08:30
08:30-12:00
12:00-17:00
17:00-18:30
18:30-19:00
19:00-19:30
19:30-20:30
20:30-03:30
15 Jun 98 03:30-06:00
06:00-08:30
08:30-10:00
10:00-11:00
11:00-13:30
13:30-14:30
14:30-00:00
16 Jun98 00:00-01:00
01:00-03:30
03:30-05:00
05:00-06:00
06:00-08:30
08:30-11:30
11:30-12:30
12:30-00:00
17 Jun 98 00:00-06:00
06:00-12:00
Duration
4hr
3-1/2 hr
1 hr
4 hr
4 hr
2hr
3-1/2 hr
lhr
5hr
6hr
1-1/2 hr
2 hr
2 hr
lhr
1-1/2 hr
2-1/2 hr
4hr
3hr
1/2 hr
2hr
1/2 hr
4-1/2 hr
3-1/2 hr
1 hr
6hr
2 hr
4hr
1/2 hr
2hr
1/2 hr
3-1/2 hr
5hr
1-1/2 hr
1/2 hr
1/2 hr
lhr
7hr
2-1/2 hr
2-1/2 hr
1-1/2 hr
lhr
2-1/2 hr
lhr
9-1/2 hr
1 hr
2-1/2 hr
1-1/2 hr
lhr
2-1/2 hr
3 hr
lhr
11-1/2 hr
6hr
6hr
Activity
Cut Casing at 5.0 ft
Cut Conductor at 5.0 ft
Retrieved Drillpipe landing string
Removed Casing head
Removed Casing head
Installed Casing head
Installed Casing head
Welded casing stub
Installed Casing head
Tested Casing head
Rigged up Tubing head spool
Rigged up BOP stack
Tested BOP stack
Retrieved Retrievable packer
Circulated at 410.0 ft
Ran Drill collar to 730.0 ft (5in OD)
Worked toolstring at 340.0 ft
Pulled out of hole to 0.0 ft
Rigged up sub-surface equipment - Other sub-surface equipment
Ran Drillpipe to 312.0 ft (5in OD)
Held safety meeting
Ran Casing to 341.0 ft (9-5/8in OD)
Installed Slip & seal assembly
Rigged up Casing handling equipment
Installed Seal assembly
Installed BOP stack
Tested BOP stack
Repaired Mud pumps
Repaired Mud pumps
Tested Casing
Made up BHA no. 1
Singled in drill pipe to 8308.0 ft
Circulated at 8290.0 ft
Set tool face
Held safety meeting
Circulated at 8308.0 ft
Drilled to 8276.0 ft
Pulled out of hole to 3500.0 ft
Pulled out of hole to 0.0 ft
Rig moved 100.00 %
Made up BHA no. 2
R.I.H. to 8250.0 fi
Serviced Block line
Drilled to 8315.0 ft
Circulated at 8315.0 ft
Pulled out of hole to 300.0 ft
Pulled BHA
Made up BHA no. 3
Made up BHA no. 3
R.I.H. to 3.0 ft
Washed to 8315.0 ft
Drilled to 8630.0 ft
Drilled to 8900.0 ft
Drilled to 9084.0 ft
Progress Report
Facility PB N Pad
Well N- 14A
Rig Nabors 2ES
Page 3
Date 21 July 98
Date/Time
12:00-18:00
18:00-20:00
20:00-01:00
18 Jun 98 01:00-03:00
03:00-04:00
04:00-06:00
06:00-07:30
07:30-10:00
10:00-12:30
12:30-15:00
15:00-15:30
15:30-16:30
16:30-18:30
18:30-19:00
19:00-21:30
21:30-23:00
23:00-00:00
19 Jun 98 00:00-03:00
03:00-03:30
03:30-06:00
06:00-08:00
08:00-08:30
08:30-09:00
09:00-10:00
10:00-12:30
12:30-13:00
13:00-14:30
14:30-16:00
16:00-20:30
20:30-22:00
22:00-02:30
20 Jun 98 02:30-06:00
06:00-08:00
08:00-09:00
09:00-09:30
09:30-10:00
10:00-15:00
15:00-00:00
21 Jun 98 00:00-03:00
03:00-05:30
05:30-06:00
06:00-10:00
10:00-11:00
11:00-12:00
12:00-15:30
15:30-19:30
19:30-04:00
22 Jun 98 04:00-06:00
06:00-10:00
10:00-11:30
11:30-12:30
12:30-13:30
13:30-14:00
14:00-15:30
Duration
6hr
2hr
5hr
2hr
liar
2hr
1-1/2 hr
2-1/2 hr
2-1/2 hr
2-1/2 hr
1/2 hr
lhr
2hr
1/2 hr
2-1/2 hr
1-1/2 hr
lhr
3hr
1/2 hr
2-1/2 hr
2hr
1/2 hr
1/2 hr
lhr
2-1/2 hr
1/2 hr
1-1/2 hr
1-1/2 hr
4-1/2 hr
1-1/2 hr
4-1/2 hr
3-1/2 hr
2hr
lhr
1/2 hr
1/2 hr
5 hr
9hr
3hr
2-1/2 hr
1/2 hr
4hr
lhr
lhr
3-1/2 hr
4hr
8-1/2 hr
2hr
4hr
1-1/2 hr
1 hr
1 hr
1/2 hr
1-1/2 hr
Activity
Drilled to 9406.0 ft
Circulated at 9406.0 ft
Pulled out of hole to 0.0 ft :
Pulled BHA
Held safety meeting
Conducted electric cable operations
Conducted electric cable operations
Removed Casing handling equipment
Made up BHA no. 4
R.I.H. to 8200.0 ft
Serviced Block line
R.I.H. to 9280.0 ft
Circulated at 9406.0 ft
Pulled out of hole to 8250.0 ft
Pulled out of hole to 0.0 ft
Pulled BHA
Held safety meeting
Ran Liner to 1300.0 ft (7in OD)
Rigged down Casing handling equipment
Ran Liner on landing string to 7500.0 ft
Ran Liner on landing string to 8240.0 ft
Circulated at 8240.0 ft
Ran Liner on landing string to 9383.0 ft
Washed to 9406.0 ft
Circulated at 9406.0 ft
Held safety meeting
Mixed and pumped slurry - 59.000 bbl
Circulated at 8091.0 ft
Laid down 1488.0 ft of 5in OD drill pipe
Laid down 720.0 ft of 5in OD drill pipe
Tested BOP stack
Made up BHA no. 5
R.I.H. to 8000.0 ft
Serviced Block line
R.I.H. to 9120.0 ft
Tested Liner - Via annulus and string
Drilled cement to 9405.0 ft
Drilled to 9800.0 ft
Drilled to 9960.0 ft
Circulated at 9960.0 ft
Pulled out of hole to 9000.0 ft
Pulled out of hole to 350.0 ft
Pulled BHA
Rigged up sub-surface equipment - Formation logs
Conducted electric cable operations
Conducted electric cable operations
Repaired Formation logs
Conducted electric cable operations
Repaired Formation logs
Conducted electric cable operations
Rigged down sub-surface equipment - Formation logs
Rigged up Casing handling equipment
Held safety meeting
Ran Liner to 750.0 ft (4-1/2in OD)
Progress Report
Facility PB N Pad
Well N-14A
Rig Nabors 2ES
Page 4
Date 21 July 98
Date/Time
15:30-16:00
16:00-17:30
17:30-18:30
18:30-01:00
23 Jun 98 01:00-02:00
02:00-02:30
02:30-05:30
05:30-06:00
06:00-07:30
07:30-09:30
09:30-13:30
13:30-14:00
14:00-19:00
19:00-20:00
20:00-04:00
24 Jun 98 04:00-06:00
06:00-07:30
07:30-09:30
09:30-10:00
10:00-12:00
12:00-12:30
12:30-14:00
14:00-16:00
16:00-17:30
17:30-22:00
22:00-00:00
25 Jun 98 00:00-00:30
00:30-02:00
02:00-06:00
Duration
1/2 hr
1-1/2 hr
1 hr
6-1/2 hr
lhr
1/2 hr
3hr
1/2 hr
1-1/2 hr
2hr
4hr
1/2 hr
5hr
lhr
8hr
2 hr
1-1/2 hr
2hr
1/2 hr
2 hr
1/2 hr
1-1/2 hr
2hr
1-1/2 hr
4-1/2 hr
2hr
1/2 hr
1-1/2 hr
4hr
Activity
Ran Tubing to 700.0 ft (2-7/8in OD)
Ran Tubing to 730.0 ft (2-7/8in OD)
Rigged down Tubing handling equipment
Ran Drillpipe in stands to 9364.0 ft
Circulated at 9936.0 ft
Ran Drillpipe in stands to 9936.0 ft
Circulated at 9960.0 ft
Held safety meeting
Mixed and pumped slurry - 18.000 bbl
Circulated at 9880.0 ft
Laid down 7168.0 ft of 5in OD drill pipe
Serviced Block line
Laid down 2500.0 ft of 3-1/2in OD drill pipe
Held safety meeting
Ran Tubing to 8000.0 ft (4-1/2in OD)
Installed SCSSSV nipple assembly
Ran Tubing to 9242.0 ft (4-1/2in OD)
Space out tubulars
Installed Tubing hanger
Circulated at 9237.0 ft
Held safety meeting
Reverse circulated at 9237.0 ft
Set packer at 9186.0 ft with 4000.0 psi
Rigged down BOP stack
Rigged up Surface tree
Freeze protect well - 151.000 bbl of Diesel
Held safety meeting
Rigged down High pressure lines
Rig moved 50.00 %
WELL N-14A
Initial Perforation
07/09/98
The following initial interval were perforated using 2 7/8" guns, 6
SPF, zero orientation and 60° phasing.
9598' - 9602' MD
The following initial interval were perforated using 2 7/8" guns, 1
SPF, zero orientation and 60° phasing.
9650' - 9652' MD
CEIVED
Client:
Field:
BP Exploration (Alaska), Inc.
Prudhoe Bay
Well Name: N-14A
APl number: 50-209-20594-01
Job number: 40002436
Rig: Nabors 2ES
County: NSB
State: AK
Spud Date: 14-Jun-98
Last survey date: 21-Jun-98
Total accepted surveys: 29
MD of first survey: 8290.10 ft
MD of last survey: 9960.00 ff
Survey,Calculations
!
Calc method for positions: Minimum Curvature
Caic method for DL$: Mason & TaYlor
Depth refer,,ences
Permanent datum MSL
Depth reference KB
GL above Permanent
KB above Permanent
DF above Permanent
0 ff
74.47 ft
43.57 ft
·
74.47 ' ff .
73.06 It.
Vertical section o~!n,,
ii i
Latidude (+N/S-): 1960.18 ff
Departure (+E/W-): 1509.18. ff
Geoma~tnetic data
ii llll
'M~gnetic Model: BGGE;I' 1997 Version
Magnetic Date: 15-Jun-98
Magnetic field streng~: 1146.31 HCNT
Magnetic dec (+E/W-): 28.03 degrees
Magnetic Dip: 80.71 degrees
MWD, Su, rvey Reference Criteria
'Reference G: ' 1002.68 milliG
Reference H: 1146.31 HCNT
Reference Dip: 80.71 degrees
Tolerance G: 3 milliG
Tolerance H: 6 HCNT
Tolerance Dip: 0.3 degrees
Azim from RT to target: 332.57 degrees
Schlum.ber~ler ,,A, NADRILL Surv,ey R, eport
I seq Measured Incl Azimuth Course
# Depth angle angle length
, (It) (deg), (deg) (ft)
1 8290.10 28.80 39.3 0.0
2 8390.45 26.71 21.8 100.4
3 8422.53 27.00 16.2' 32.0
4 8454.95 27.38 7.9; 32.5
5 8486.72 27.70 1.1 31.7
Correction
Magnetic ~lec (+E/W-):
Grid convergence (+E/W-):
Total az corr (*E/W-):
..... 'rvb verticai'
depth section +N/S-
(ri) (fi) (_fi).
7639.70 1045.76 1960.20
7728.69 1070.11 1999.94
7757.25 1080.08 2013.59
7786.17 1091.52 2028.08
7814.28 1103,95 2042.67
Displacer~'~nt
1509.20
1532.94
1537.64
1540.72
1541.87
28.06' degrees '
0 degrees
28.06 degrees
';rotal 'at"Azm DLS
displacement (deg/
(fi), (de,fl 100f~
2473.88 37.59 0.00
2519.85 37,47 8.35
2533.55 37.37 7.95
2546.95 37.22 11.72
2559.27 37.05 .9.96
6 8517.25 27.92 353.3 30.5 7841.27 1116.86 2056.86
7 8548,87 28.22 345.0: 31.7 7869.25 1131,13 2071.47
8 8580.76 28.47 336.9 31.9 7897.34 1146.08 2085.76
9 8612.33 28.25 334.2 31.5 7925.06 1161.02 2099.38
10 8644.24 27.55 332.9 31.9 7953.25 1175.95 2112.74
1541.17
1538.36
1533.43
1527.24
1520.59
2570.19 36.84 11.95
2580.23 36.60 12.35
2588.78 36.32 12.07
2596.12 36.03 4.13
2603.05 35.74 2.91
11 8676.62 26.98 334.5 32.4 7982.05 1190.79 2126.04
12 8708.19 26.26 334.2. -31.6 8010.30 1204.94 2138.81
13 8739,89 25.67 334.3 31.7 8038.8(3 1218.81 2151.31
1514.01
1507.88
1501.85
2610.04 35.46 2.87
2616.91 35.18 2.32
2623.68 34.92 1.87
Page 1
ORIGINAL
Schlumberger ANADRILL ~u,rvey Report ..,
ISeq Measured lncl Azimuth Coume TVD Verti~i" Dispi;'ce~ent 'Total at Azm DLg
# Depth angle angle length depth sec'don +N/S- +E/W- displacement (deg/
~ff) ,,,(;deg) (deg) -, (~fl:} ,Iff;) (ft) (ff~) ','(it) '(fi) (de~) 100~
14 8771,61 25,39 334,1 31.7 8067,40 1232.47 2163,61 1495,91 2630,39 34.66 0.92
15 8803,38 25,09 334,.5 31.8 8096,17 1246,02 2175,83 1490,03 2637,12 34.40 1,09
16 8834.57 24,77 334.5
17 8866.94 24,32 334.2
18 8961,82 25,33 333,3
19 9055,85 25,32 333.6
20 9151,52 25.17 331,0
31.2 8124.46 1259.17 2187.70 1484.37 2643.74 34,16 1.03
32.3 8153.84 1272.58 2199.79 1478.56 2650.51 33.91 1.45
94.9 8239.97 1312.41 2235.52 1460.93 2670.56 33.16 1.14
94.0 8324.94 1352.61 2271.49 1442.96 2691.06 32.43 0.14
95.7 8411.50 1393.42 2307.62 1423.99 2711.62 31.68 1.17
21 9246.31 26.03 329.5
22 9341.90 25.17 327.6
23 9456.98 24.39 327.7
24 9552.57 22.g0 327.7
25 9647.87 22.93 327,6
94.8 8496.99 1434.34 2343.18 1403.66 2731.44 30.92 1.14
95.6 8583.21 1475.54 2378.42 1382.12 2750.84 30.16 1.24
115.1 8687.71 1523.61 2419.17 1356.31 2773.44 29.28 0.68
95.6 8775.28 1561.81 2451.58 1335,82 2791.89 28.59 1.56
95.3 8863.06 1598,78 2482.93 1315.96 2810.11 27.92 0.05
26 9743.26 22.60 329.4
27 9838,61 23.10 333.7
28 9903.43 23.26 331.3
29 9960.00 23.26 331,3
95.4 8951.03 1635.59 2514.40 1296.67 2829.06 27.28 0.81
95.3 9038,86 1672.57 2546.92 1279.07 2850.06 26,67 1.83
64.8 9098.43 1698.07 2569.54 1267.29 2865.06 26.25 1.48
56.6 9150.43 1720.42 2589.15 1256.56 2877.95 25.89 0.00
Page 2
MEMORANDUM State of Alaska
TO:
David John/s~',
Chairman'"'
Alaska Oil and Gas Conservation Commission
DATE: June 19, 1998
THRU' Blair Wondzell, 4i~~ FILE NO:
P. I. Supervisor ~P.,f'
aimkfsfe, doc
FROM' Chuck Scheve, "<
- ~ SUBJECT:
Petroleum Inspector
BOPE Test
Nabors 2ES
PBU N-14A
PTD # 97-211
Friday June 19, 1998: ! traveled to BPXs N-14A well and witnessed the weekly
BOPE test on rig 2ES.
As the attached AOGCC BOPE Test Report shows there was one failure. The gas
detectors (Methane and H2S) were out of calibration. These were being calibrated
when I departed location and were completed well in advance of drilling the 7"
casing shoe.
The testing went very well with good test procedures being employed by the Nabors
crew. The rig was clean and all equipment seemed to be in good working order.
The location was clean and all extra equipment was properly stored.
Summary: I witnessed the weekly BOPE test on Nabors Rig 2ES drilling BPXs
N-i~,A well.
NABORS 2ES, 6119/98, Test Time 3.5 Hours, One Failure
Att~3chment: aimkfsfe.xls
X Unclassified Confidential (Unclassified if doc. removed )
' STATE OF ALASKA
OIL AND GAS CONSERVATION COMMISSION
BOPE Test Report
OPERATION: Drlg:
Drlg Contractor:
Operator:
Well Name:
Casing Size: 7"
Test: Initial
X Workover:
NABORS
SSD
N-f4A
Set @
Weekly
Rig No. 2ES PTD#
Rep.:
Rig Rep.:
9,400 Location: Sec.
X Other
DATE: 6/fg/98
97-211 Rig Ph.# 65g-4836
Charlie Russel
Charlie Hensly
8 T. llN R. 13E Meddian Urn.
MISC. INSPECTIONS:
Location Gen.: OK
Housekeeping: OK (Gen)
PTD On Location YES
Standing Order Posted YES
Well Sign OK
Drl. Rig OK
Hazard Sec. YES
Test
Quan. Pressure P/F
I 50015000 P
,,
I 500t5000 P
1
FLOOR SAFETY VALVES:
Upper Kelly / IBOP
Lower Kelly / IBOP
Ball Type
Inside BOP
BOP STACK:
Annular Preventer
Pipe Rams
Lower Pipe Rams
Blind Rams
Choke Ln. Valves
HCR Valves
Kill Line Valves
Check Valve
Quan. Test
1 250
I 250
I 250
I 250
f 250
2 250
I 250
N
Press.
/25OO
/5000
/5000
/5000
/5000
/5000
/5000
/A
P/F
P
P
P
P
P
P
P
, ,
MUD SYSTEM: Visual Alarm
Trip Tank OK OK
Pit Level Indicators OK OK
Flow Indicator OK OK
Meth Gas Detector F/P F/P
H2S Gas Detector F/P F/P
Test
CHOKE MANIFOLD: Pressure P/F
No. Valves 14 250/5,000 , P
No. Flanges 32 250/5,000
Manual Chokes '1 Functioned
Hydraulic Chokes f Functioned
ACCUMULATOR SYSTEM:
System Pressure
Pressure After Closure
200 psi Attained After Closure
System Pressure Attained
Blind Switch Covers: Master:
Nitgn. Btl's: 4 @2100
3,000 ! P
1,500 P
0 minutes 30 sec.
minutes 50 sec.
YES Remote: YES
Number of Failures: f ,Test Time: 3.5 Hours. Number of valves tested 23 Repair or Replacement of Failed
Equipment will be made within 0 days. Notify the Inspector and follow with Written or Faxed verification to
the AOGCC Commission Office at: Fax No. 276-7542 Inspector North Slope Pager No. 659-3607 or 3687
If your call is not returned by the inspector within 12 hours please contact the P. I. Supervisor at 279-1433
REMARKS:
Gas detectors out of calibration when ! arrived on location. They will be m-calibrated pdor to drilling! 7" shoe.
Distribution:
odg-Well File
c - Oper./Rig
c- Database
c - Tdp Rpt File
c -Inspector
FI-021L (Rev,12/94)
STATE WITNESS REQUIRED?
YES X NO
24 HOUR NOTICE GIVEN
YES X NO
Waived By:
Witnessed By:
aimkfsfe
Chuck Scheve
BP EXPLORATION
BP Exploration (Alaska)Inc.
P.O. Box 196612
Anchorage, Alaska 99519-6612
TELECOPY
SATELLITE UNIT
TO:
Name:
Company:
Location:
Alaska Oil & Gas_Conserv_ation Commission
Anchorage Fax # 276-7542/659-2717
FROM:
Name & Ext.' Jon Turnbull
Department: Shared Services Drilling 907-564-5151 (t)
NOTES:
Biair,
! attach for your information the preliminary findings of the investigation on the
Christmas Tree incident on N 14a. I will call you on Monday to discuss.
Jon
PAGES TO FOLLOW
(Do not include cover sheet)
i i iii i r
SECURITY CLASSIFICATION
PRIVATE SECRET
ii i i i i iii I
SATELLITE FAX MACHINE
CONFIDENTIAL
II
FAX# ._ , 564-5193 , CONFIRM#
564-5151
Nabors..Rig 2ES, N..14a, 4.22.98,Wellhead Incident
Preliminary Reoort and.Findings
D.Nims, SSD Drilling Superintendent
D.Hebert, Nabors Drilling Superintendent
J.Haynes, Nabors Safety Director ~
~1.22.98.
INTRODUCTION
Summary: .
On Wednesday, April 22, 1998, a serious incident occurred on Nabors Rig~
2-ES while moving onto Well N-14A in the PBU WOA. The crew was in the process of
moving the rig over the well when the rig struck the wellhead. There was damage to 13
3/8" surface and 9 5/8" casings resulting in the wellhead being tilted to an angle of
approximately 20 degrees.
There were no spills or injuries to personnel as a result of this incident. The rig was
backed off from the wellhead and operations were halted pending the arrival of the
Anchorage investigation team that afternoon.
Prior to moving the rig onto the well, the well had been suspended in accordance with
SSD policy. As such, there was no potential for this incident to result in an uncontrolled
release from the well. Perforations were isolated by a pressure tested cement plugback
through a cement retainer, kill weight seawater to surface and a pressure tested
mechanical wellhead hanger plug barrier. During the suspension process, all
hydrocarbons and gas were removed from the well (except for the diesel freeze
protection), and pressure isolation con£trmed through the wellhead and tree pressure
voids.
Terms of Reference:
The investigation team consisted of the following personnel:
Team Leader:
lohn Haynes, NAD Safety Director
Team Members:
Dave Hebert, NAD Drilling Superintendent
Dave Nims, SSD Drilling Superintendent
John Miller, SSD Safety Advisor
Chaflie Russell, SSD Company Representative
The purposes of the investigation were to:
Investigate the circumstances surrounding the accident and determine the underlying
causes.
· Make recommendations to prevent a reoccurrence.
Identify and communicate lessons learned.
The team investigated the events leading up to the incident, and identified the direct and
indirect causes and contributory factors of the incident.
Conduct of the Investigation
The accident was reported in a timely manner and in compliance with the Nabors safety
and health policy and the BPXA emergency response procedures with notification to all
respective supervisors.
An investigation team was assembled and sent to the accident site at 11:50 a.m., April 22,
1998.
Written statements were taken fa-om the Nabors personnel involved in the incident by the
Toolpusher (Robert French) in the prescribed manner to determine the facts of the
incident.
· Robert French expl. ained that the objective of the statements were to determine the
facts of the incident, not to fix blame on any individual or group,
· Each crew member involved in the incident was asked to describe what happened and
the events before and after.
Each crew member was thanked for his help,
All crew members were given the opportunity to review the drafts of their written
statements for accuracy and understanding of what they had said.
· The team reviewed the data and developed a comprehensive account of the incident,
identified actions to prevent a reoccurrence, and initiated communication of the
lessons learned to all operations.
Crew member statements:
Robert French Toolpusher
Mike Meadows DrilLer
Jon Castle Motorman
Dennis Jackson Derrickman
Mark Dolecki Forklift Operator
Tony Escobar Floorman
Randall Marmon Ftoorman
Allen Falcon FIoorman
Mike Fell Roustabout
INCIDENT LOCATION AND CONDITIONS
Time and Place of Incident
6:50 a.m., April 22, 1998, Rig 2-ES at N pad, Well N-14A, PBU WOA, 6 hours 50
minutes into the day shift of the twelfth day of the hitch.
Nature of Incident
The equipment operator (Driller) had a restricted view of the path of equipment in
proximity to other facilities and movement of the rig was not controlled by on-going
positive instruction from the person (Spotter) directing the move.
Personnel Involved
Robert French
Mike Meadows
Ion Castle
Dennis Jackson
Mark Dolecki
Tony Escobar
Randall Marmon
Alien Falcon
Mike Fell
Toolpusher, 3 years as toolpusher, 13 years with NADI
Driller, 7 months as driller, 8 years with NADI
Motorman, 8 months as motorman, 8 years with NADI
Derrickman, 8 months as derrickman, 4 years with NADI
Forklift Operator, 16 years as forklift operator with NADI
Floorman, 1 year at floors, 3 years with NADI
Floorman, 8 months as floorman with NADI
Floorman, 1 year as floorman with NADI
Roustabout, 1 year as roustabout with NADI
Equ,,ipment Involved
Sub base of rig moving system
· BOP stack
· Wellhead
Maintenance history:
· Visual inspection before operation
· Inspections are performed and verified through the Nabors maintenance program.
Weather and site Condition
· Temperature: 25 degrees
· Weather Conditions: Foggy
· Wind: Calm
Well Head Area:
Dry
Lighting was good in all areas
DESCRIPTION OF INCIDENT AND RESPONSE
Description of Incident
The rig crew was in the process of spotting the rig sub base over well N-14. There were
three spotters in place, one in the front with a radio, one in the back with a radio, and a
third in the back with no radio. The forklift operator was inside his forklift at the back of
the rig observing the move without a radio. Three prior attempts were made to spot the
rig straight over the hole. During other attempts, the Driller moved the rig at the direction
of the Spotter on a proximity basis (i.e. "move 4 foot, 3 foot, 2 foot"). On the fourth
attempt, affirmative communication was not used. Randy Marmon was spotting in the
rear in the wellhead area using a radio to guide Mike Meadows who was driving the front
end of the sub base. As Mike was moving the sub base over the wellhead, Randy saw
that a drain hose hanging from the sub base had caught on the wellhead. Randy used the
radio to tell Mike to stop. There was no response and the rig kept moving. Randy then
yelled "STOP, STOP, STOP" but the rig continued moving and struck the wellhead with
the BOP staclc The BOP stack was stored on the BOP stump in the sub base. Mike felt a
drag on the moving system and stopped the sub base to find out what was wrong. The
toolpusher, Robert French, was in the pickup truck driving around to the front of the rig
to double-check that the correct instructions were given for turning the wheels. When he
saw that the rig had stopped he drove to the back of the rig and observed that the sub base
had hit the well. He immediately instructed the driller to move the rig away from the well
so they could survey the damage and initiate appropriate emergency response. The
wellhead was bent about 20 degrees. The radios were checked prior to the move and
again after the incident and worked normally.
Resl~onse:
6:50 am
7:00 am
7:05 am
7:15 am
7:15 am
7:25 am
7:30 am
7:30 am
8:00 am
11:50 am
April 22, 1998, incident occurred
Robert French notified Charlie Russell
Charlie Russell notified Dave Nims and FMC
Dave Nims notified Steve Walls and John Miller
Robert French notified Dave Hebert
Dave Hebert notified Jim Denney
Dave Nims notified Fritz Gunkel
John Miller notified A1 Schmoyer, PE supervisor, Dave Rhomburg, well
service supervisor, and Eric Moffard, field production supervisor
Dave Hebert notified John Haynes
Investigation team departed for Slope
Causes of Incident:
· Lack of effective procedure
· Communication system was inadequate
Findings:.
· 2-ES's forklift had broken down and they borrowed 18-E's forklift which uses a
different radio frequency.
· The base radio on the rear operator' s console of the moving system was not working
and the operator used a spotter's hand-held mobile radio.
· The spotter in the well head area was using a hand held radio. He usually uses a radio
with a microphone.
· There was either sporadic radio malfunction or the spotter did not correctly key the
transmit button on his radio and the message to stop the rig movement was not heard
by the operator.
· A pre-job safety meeting was held prior to the rig move but inadequately provided for
a fail-safe process for moving the rig in safety critical areas.
· The spotter did not control the rig movement through continuous advise to the Driller
of the position of the rig relative to the wellhead,
· The Driller could not see the wellhead and moved the rig in the absence of on-going
positive communication from the spotter,There are no written procedures for spotting
the rig.
· There is no formal training in the use of mobile radios.
· The spotter in well head area had 8 months experience on Rig 2-ES.
· Driller had 8 months experience drilling but had moved the rig 30 to 40 times in other
positions.
· Motorman (spotter in the back without a radio) was distracted from rig move by
telephone call from fuel track.
· Rig was approximately two feet away from the well head center when Randy Marmon
observed the hose catching on the well head.
· The wellhead was struck in two places by the BOP.
· The rig crew made an excellent emergency response.
Recommendations and Action Items:
· Brace damaged wellhead. David Nims, April 23, 1998
· Confirm that all Nabors rigs have a written procedure for spotting the rig on the well.
Dave Hebert, Paul Smith, Mike Williams, May 31, 1998
· Develop a rig move checklist for all Nabors rigs to be used in pre-job safety meetings.
Include radio requirements. This will be included in the spotting procedure. Dave
Hebert, Paul Smith, Mike Williams, May 31, 1998
When an equipment operator (Driller) has a restricted view of the path of equipment
in p~'oximity to other facilities, movement must be controlled by on-going positive
instructions by a person directing the move (Spotter).
Train all Nabors personnel in the use of mobile radios. Randy Bovy, June 30, 1998
Investigate the possibility of installing video cameras in the sub base so drivers can
see where they are going. Dave Hebert, 4/31/98
· Investigate the use of a duplex radio system. Dave Hebert, 4/31/98
· Communicate the findings and recommendations from this incident to other drilling
contractors.
TONY KNOWLE$, GOVEF~NOR
ALASKA OIL AND GAS
CONSERVATION COMMISSION
3001 PORCUPINE DRIVE
ANCHORAGE, ALASKA 99501-3192
PHONE: (907) 279-1433
FAX: (907) 276-7542
November 19. 1997
James Smith
Senior Drilling Engineer
BP Exploration (Alaska) Inc.
POBox 196612
Anchorage. AK 99519-6612
Re:
Prudhoe Bay Unit N- 14A
BP Exploration (Alaska') Inc.
Permit No' 97-211
Sur. Loc.: 3917'SNL. 4731'WEL. Sec. 08. T1 IN. R13E. UM
Btmhole Loc: 3991'NSL. 3462'WEL. Sec. 08. T1 IN. R13E, UM
Dear Mr. Smith:
Enclosed is the approved application for permit to redrill the above referenced well.
The permit to redrill does not exempt you from obtaining additional permits required by law from
other governmental agencies, and does not authorize conducting drilling operations until all other
required permitting determinations are made.
Blowout prevention equipment (BOPE) must be tested in accordance with 20 AAC 25.035.
Sufficient notice (,approximately 24 hours) of the BOPE test performed before drilling below the
surface casing shoe must be given so that a representative of the Commission may witness the
test. Notice may be given by contacting the Commission petroleum field inspector on the North
Slope pager at 659-3607.
David W. Johnston N
Chairman "~......~
BY ORDER OF THE COMMISSION
dlf/enclosures
cc:
Department of Fish & Game. Habitat Section w/o encl.
Department of Envinornment Conservation w/o encl.
STATE OF ALASKA
ALASKA'~IL AND GAS CONSERVATION COI~Tf~ISSION
PERMIT TO DRILL
20 AAC 25.005
la. Typeofwork I--IDrill [~Redrill Ilb. Typeofwell I--IExploratory I--IStratigraphicTest I~ Development Oil
I--IRe-Entry [-I DeepenI r'-iService [] Development Gas I--I Single Zone F-lMultipleZone
2. Name of Operator 5. Datum Elevation (DF or KB) 10. Field and Pool
BP Exploration (Alaska) Inc. Plan KBE = 73.3' Prudhoe Bay Field / Prudhoe
3. Address 6. Property Designation ,¢~. Bay Pool
P.O. Box 196612, Anchorage, Alaska 99519-6612 ADL
4. Location of well at surface 7. Unit or Property Name 11. Type Bond (See 20 AAC 25.025)
3917' SNL, 4731' WEL, SEC. 08, T11N, R13E, UPM Prudhoe Bay Unit
At top of productive interval 8. Well Number Number 23100302630-277
3821' NSL, 3375' WEL, SEC. 08, T11N, R13E, UPM N-14A
Attotal depth 9. Approximate spud date Amount $200,000.00
3991' NSL, 3462' WEL, SEC. 08, T11N, R13E, UPM 11/18/97
12. Distance to nearest property line113. Distance to nearest well 14. Number of acres in property 15. Proposed depth (MD and TVD)
ADLI No Close Approach 2560 10047' MD / 9227' TVD
16. To be completed for deviated wells 17. Anticipated pressure {see 20 AAC 25.035 (e) (2)}
Kick Off Depth 8300' Maximum Hole Angle 27.5° Maximum surface 3065 psig, At total depth (TVD) 9016' / 3967 psig
18. Casing Program Specifications Setting Depth
Size Top Bottom Quantity of Cement
Hole Casing Weight Grade Coupling Length MD TVD MD TVD (include stage data)
8-1/2" 7" 26# L-80 BTC-Mod 1256' 8150' 7517' 9406' 8636' 308 cuft Class 'G'
6" 4-1/2" 12.6# L-80 IBT-Mod 791' 9256' 8503' 10047' 9227' 124 cu ft Class 'G'
19. To be completed for Redrill, Re-entry, and Deepen Operations.
Present well condition summary i.i ~'):"-,./
Total depth: measured 10205 feet Plugs (measured)
true vertical 9433 feet ~¢a, sk~t 0ii & Qas C0~s,
Effective depth: measured 10134 feet Junk (measured) fill at 10134' MD (11/86)
true vertical 9364 feet
Casing Length Size Cemented M D TVD
Structural
Conductor 110' 20" x 30" 8 cu yds 144' 144'
Surface 2644' 13-3/8" 3720 cu ft 2678' 2678'
Intermediate 9310' 9-5/8" 1430 cu ft 9344' 8603'
Production
Liner 1349' 7" 344 cu ft 8856' - 10205' 8148' - 9433'
Perforation depth: measured 9670' - 9686', 9692' - 9710', 9720' - 9740'
true vertical subsea 8836'-8903' (three intervals)0RI61NAL
20. Attachments [] Filing Fee [] Property Plat [] BOP Sketch [] Diverter Sketch [] Drilling Program
[] Drilling Fluid Program []Time vs Depth Pict [] Refraction Analysis [] Seabed Report [] 20 AAC 25.050 Requirements
Contact Engineer Name/Number: C. Michael Jackson, 564-5480 Prepared By Name/Number: Terrie Hubble, 564-4628
~h~e is~.~__correct to the best of my knowledge
21. I hereby certify t foregoing
Signed mitt~
James s Title Senior Drilling Engineer, Acting Dar
Oommission Use Only
Number I APl Number I Appl ij~val [;)ate-- Isee c°ver letter
Permit,/~ '"-~.,'/// 50-029-20594-01 ¢~i !~3 for other requirements
Conditions of Approval: Samples Required []Yes []No Mud Log Required []Yes [] No
Hydrogen Sulfide Measures r~Yes [] No Directional Survey Required I~Yes [] No
Required Working Pressure for BOPE I--]2M; []3M; [~5M; []10M; []15M
Other:
Original Signed 6~ by order of
Approved By David W. Johnston Commissioner the commission Date
.
rl~licate
Form 10-401 Rev. 12-01-85 Submit
I'tUV .L~ ' '~ r
N-14a Proposed Completion
13 3/8", 60#,
L-80, BTC
Surface
Casing @ 2678'
9 5/8", 47#, L-80,
Intermediate C,.sg
KOP @ ~
SSSV @ 2000'
4-1/2", 12.6#, L-80, BTC Mod Tubing
4-1/2" Standard GLMs
(Depths to be supplied later)
Packer / Tailpipe
10' Pup Jt.
"X" Nipple
10' Pup Jt.
Production Packer
10' Pup Jt.
10' Pup Jt.
"X" Nipple
I0' Pup Jt
"XN" Nipple
10' Pup Jt.
WLEG
· ..
.
Original
Production
Packer @ 8786'
7" liner top.
@8856MD
9 5/8"@9344 MD
7" 26# L~80 liner
set at TSAG
4 1/2' 12.5# L-80 liner
set at TD.
B. W. Smith 918/97
{Well Name: I N-14A
Well Plan Summary
I Type of Well (producer or injector): I Oil Producer
ISurface Location:
Target Location:
I Bottom Hole Location:
3917'FNL 4731'FEL Sec 08 T11N R13E
3821' FSL 3375' FEL Sec 08 T11N R13E
3991' FSL 3462' FEL Sec 08 T11N R13E
I AFE Number: I 4P1052 I
Estimated Start Date: I Nov. 18, 1997 I
IMm 110047, I ITvD:
Rig: I Nabors 18E
Operating days to complete: I 17
9227' I IRT-GL
I KBE:
29.00'
73.3'
I Well Design (conventional, slimhole, etc.) I Conventional Sidetrack
Formation Markers:
Formation Tops MD TVD (RKB)
KOP 8300 7649
TJ F 8316 7663
TJD 8772 8O73
TJA 9324 8563
SAG RIVER 9386 8618
SHUBLIK 9429 8656
IVISHAK (TARG ET) 9522 8739
ZONE 3 9691 8893
ZONE 2 9780 8976
HOT 9844 9O36
OOWC 9900 9089
ZONE 1 10037 9218
TD 1 OO47 9227
Casin¢l/Tubing Proqram:
Hole Size Csg/ Wt/Ft Grade Conn. Length Top Btm
Tbg O.D. MDrFVD MD/TVD
NA 9-5/8" 47# L-80 BTRS in place Surface 8300'/7649'
8-1/2" 7" 26# L-80 BTC- 1256' 8150'/7517' 940678636'
MOD
6" 4-1/2" 12.6# L-80 I BT- 791' 925678503' 1004779227'
MOD
Tubing
Directional:
I KOP:
I Tangent Angle
8300' from whipstock
I27.50
N-14A Permit Info Page 1
Close Approach Well: I NONE
Logging Program:
Logs: I
.......................... I
16' Hole: I
MWD: GR/Directional
MWD: GR/Directional while drilling. Platform Express and RFT at TD
Mud Proqram:
Intermediate Mu-'~ Properties: 6% KCL I Intermediate from KOP to Sag: 8 ~" Hole
Density Marsh Yield 10 sec pH HTHP Fluid
(PPG) Viscosity Point gel Loss
Initial 10.0 45-55 25-35 8-20 8.5-9.0 <10.0cc
Final 10.4 45-55 25-35 8-20 8.5-9.0 <10.0cc
Production Mud Properties: Quickdril'n I Production hole section: 6" Hole
Depth Density Viscosity LSRYield LSRV Fluid pH
(PPG) Point Loss
Initial 8.6-8.8 50-65 12-20 35-50000 NC 8.5-9.0
Final 8.6-8.8 50-65 12-20 35-50000 NC 8.5-9.0
Cement Calculations:
P & A: Plug and abandon perforations in 7" I
Basis: Calculated cement volume to bring cement 100' above top perforation after squeezing 5 bbl to perforations
Total Cmt: 11 BBLs / 53 Sks / 62 Cu Ft of Class 'G' tail 15.7 ppg 1.17 cu ft/sk.
Liner Size: 7" I
Basis: Calculated cement volume to bring cement to 200' above 7" liner top hanger using 50% open hole excess
with 80' shoe track.
Total Cmt: 55 BBLs / 264 Sks / 308 Cu Ft of Class 'G' tail at 15.7 ppg 1.17 cuft/ sk.
Liner Size: 4 1/2" I
Basis: Calculated cement volume to bring cement to 200' above 4 1/2" liner top hanger using 30% open hole
excess with 80' shoe track.
Total Cmt: 22 BBLs / 106 Sks / 124 Cu Ft of Class 'G' tail at 15.7 ppg, 1.17 cu ftJ sk.
Well Control:
Well control equipment consisting of 5,000 psi W.P. pipe rams, blind rams, and annular preventer will be installed and is
capable of handling maximum potential surface pressures.
BOPE and drilling fluid system schematics on file with AOGCC.
Bottom hole pressure is 3967 psi at 9016' TVDss(estimated). Maximum shut in casing pressure at surface is 3065 psi
assuming a 0.10 psi/ft gas gradient to surface.
Hazards / Contingencies:
N Pad is not an H2S pad.
N-14A Permit Info Page 2
N-14A will have a vertical departure of less than 600' from the original wellbore and should not encounter any unexpected
pressu res.
Contacts
Office Home
C. Michael Jackson Ops. Drlg. Engineer 564-5480 349-1383
Dan Stoltz Sr. Drlg. Engineer 564-4922 349-6483
David Nims Drlg. Superintendent 564-5219 348-2533
Shawn Shirzadi Pad Engineer 564-5397 348-0060
Steve Jones Geologist 564-5831 345-3719
Dave Vralsted Geophysicist 564-4415 349-9166
Bruce Smith Asset Drlg Engineer 564-5173 345-2948
Pre-Riq Work:
1. Pullthe SSSV.
2. Test the 9 5/8" x 5 1/2" annulus to 3500 psi.
3. Perform a P&A cement job squeezing 5 bbl to the formation and top of cement 100' above the perforations.
4. Slickline tag top of cement and pressure test to 2000 psi.
5. Cut the tubing at - 8731'.
6. Circulate and kill the well with seawater.
7. Freeze protect to 2100'.
8. Install a BPV and test.
Ri.q
1.
2.
.
4.
5.
6.
Work:
MIRU, verify packoff has been tested or retest. Pull BPV.
Circulate the well to remove freeze protection and confirm well is dead. Set and test TWC to 1000 psi. ND tree, NU
BOP's.
Pull and lay down 5 Y2" tubing to cut joint.
Run and set a 9 5/8" bridge plug on Baker 20 setting tool(w/CCL) at -8310'.
Test the 9 5/8" casing to 3500 psi, 30 min.
PU Baker anchor/whipstock assembly and MWD. RIH and set whipstock on top of bridge plug. Mill out of 9 5/8" casing
plus 22' open hole.
8 1/2" hole section to TSag at ~9386'(8618' TVD).
and cement 7" casing to TD with 150' lap.
6" hole section to target TD at -10,046'(9227' TVD).
Platform Express and RFT open hole logs.
and cement 4 Y2" casing to TD with 150' lap. Test casing to 3500 psi, 30 min.
7. Drill
8. Run
9. Drill
10. Run
11. Run
12. Run 4 Y2" 12.6# L-80 tubing completion.
13. ND stack, NU tree and test to 5000 psi.
14. Secure well, release rig.
C. Michael Jackson
11/11/97
N-14A Permit Info Page 3
(7) Formation Tops(TVDss) and Estimated Pore Pressures
Estimated Hydrocarbon Estimated Estimated
Top (TVDss) Uncertainty Bearing Y/N Pore Press. Pore Press.
Formation (PsO (ppg EMYO
Base Permafrost In N-14
SV3 / T5 In N-14
UG4 / K15-C1 In N-14 I
~Ja~/~J~S InN-in i
TUZC In N-14
ws~ / W. SAI~ In N-14
CM3 / K12 In N-14
TnRZ i~n ~q-14 I
TPTR INN-14 .
TlCUP In N-14
TMLV In N-14
TJa Inu-14
TJG 7250 200 N 82
TJF ' 7590 200 N 8.5
TJE 7775 200 N 8.5
TJD 8000 2001N 3520
8.5
TJC 8270 200N 8.5
s 9o
00.
8583 30JY 3777 8.5
TSAD 8666 30 Y ' ,381,3 8.5
TSHU
TZ3 8820 30Y `388] 8.5 i
Tm 8903 30 V . ,3917 I 8.5
TZl 9145 30 N j
ROT 8963 20 Y 8.5
OOWC 9016 10 ,3967 8.5
' CGOC 8713 10 8.5
Comments Pore pressure prediction assumes .44 psi/R gradient or 8.5 lb/gal
Page 3
9/8/97
Anadrill Schlumberger
Alaska District
lll! East 80th Avenue
~nchorage, ;LK 99518
(907) 349 4511 PeK 344-2LG0
DIRBC'r:0,%";J, ~;2,','-- P:.,'4: toz S]L,~D S_'?,;':L'~S
Well ......... : }{-14A
Pield ........ : Prudhoe Bay, N-Pad
Computation..= M/n/mum Curvature
Units ........ ~ PEET
Surface Lat..: 70.31851378 N
Surface Lon~,: 148.91039866 W
Legal Description
Surface ...... ~ ~362 FSL 4732 FE5 S08 XLiN RI3E UM
~ie-in Survey: 3322 PSL 3216 FEL S08 TkXN R13H ~4
Target ....... : 3821 PSL 3375 FEb SO8 TLXN R~3H UM
BHL .......... : 3991 PS5 ~46R F~L S08 TL£N RI3S UM
LOCATIONS - ;L~ASKA Zone:
X-Coord
6344i0,00
~35883,75
635~14,00
635623,23
4
Y-Coord
S967267.00
5969253.69
S969750.00
59699l?.58
PROPOSED W~LL PRQPILE
STAT[OR M~SL~D
IDENT~ F[CAT£ON DEPTH
TJG
TIE- £N SURVEY 8294.60
TOP 0F W]~TX)W 829~. 00
K0P C'qJR%'E 8/100 B300,00
T~ 8316.29
28.77
28,77
28.72
28.04
DIRECTION VHRT]CA/~-DEPT~S
AZIP~JTH TVD SUB -SEA
7323.27 7250,00
39.29 ~_~_ 75~0.93
39.29 7644.55 7571.28
39.25 7648.94 7575.67
36.90 7663.17 7590.00
Prepared ..... : 04 8ep 1997
vert sect az.: 332.58
KB eLevat{on.: 73,27 ft
Magnetic Dcln: .~28.238 (E)
Scale Pactor.: 0.9999~-052
Convergence,,: +1,02596026
....
ANADRI[L AKA-DPC
FEASIBILITY PLAN
NOT APPROVED FOR
EXECUTION
PLAN
:- ~%.~.~.~_.~r_,.; ......, ,__~.. ..... ..., ..... ~ ~_
SECTION ~I~THS-PROM ~ ~ne 4 ~h DL/
DEPOT W~LLH~ X Y ~AC8 [~
1045.08 1960.14 N L509.2L E 635883,75 5969253.69
1045.:6 1960.29 N 1509.33 E 635883,8? 5969253.85 1625 3.05
1046,11 £962.15 N 1510.85 E 635885,36 5969255.7] 122b
1049,32 £968.26 N [515.63 E 635890,03 5969263.9l 1205 8.00
Z
~0
TJE I
END e/LO0 CUR~
8400.00 25.3L 23.25 7738,13 7664.86
8500.00 24,02 4.25 7829.15 7?55.88
8520.93 24.06 ~.:.{ 7848.27 7775.00
~et,-. · ',~ *'.lT. 2.: ....... . ~.,-~ .e.~. ,.~"
~695.2~ 27.49 332.5; ~(,?. t5 19':4.48
TJD B771.70 27.49 332.58 8093.29 BO00,O0
1069,21 2000.46 N L534.53 ~ 635908.34 5969294.45 108L 8.00
~100.14 2040.46 N 1544.49 E 6359L?,58 5969334.62 91~ 8.00
1109,55 2049.97 N 1544.8L E 6359XT.P~ 5969343.14 875 8.00
!~ ' 28 208~,~" ~; L~40.~~ ~ ~"'"'~ "~ 59~9375.46 ?3L 8.0n
i~;~.31 2Z12.3L N ~S2~,4~ ~ %359Ub.z3 5969406.L7 HS 8.00
1215,81 2151.8[ N L507,93 E 635879.04 5969445.29 HS 0.00
(Anadr:.',; (C)9? fL ;;',,'3 3.0C 9:14 Al4 P)
04 Se/:, 1.997 Page 2
PROPOSED WEt, t, PI:;OFIGE
S'I'AT I ON MgA S UN l{ D
DENT[ FI CAT ION DE [:TH
TJC 90?6.O6
TJB 921T.34
ToP s~ a~vaa 9~86.o~
INCI,N I)[R~CT£OII
ANGLE AZ.IML~R
27.49 332.58
27.49 232.5~
27.49 332.58
27.49 332.58
27.49 332.58
VERTICAL DEPTHS SECTION CO01U)INA'r~$-FI{(Xq ALASKA. Zone 4 1~9OI, Dh/
T'VD SUB-SEA DEPART WELLHBAD X Y FACR 100
8343,27 8270.00 L356.31 22'76.53 N ~443,24 ~ 6378%2.L3 5969568,82 I{S 0.00
8463.27 8390.00 14[8.75 2331.96 N 1414,49 g 637'182.~0 5969623.73 IlS 0.00
8563.27 8490.00 [470.79 23'18.'15 N 1390,53 E 635757.61 596~669.48 MS 0.00
8618.27 8~45.00 [499.41 2403.56 N 137';.35 E 635743.99 5969694.64
~635.95 8562.6~ [508,61 2411.72 N ]]73,t[ E 635';39.60 5969702.73 [~ 0.00
SHI/BB£K 9428.90 27.49 ~32.58
DROP 4/100 9522.47 27.49 332.58
TARGET ~"~***~*****~ 9522.47 27.49 332.58
TOP XV[SI{A.K 9522.47 27.49 3~2.58
9600.00 ' 24.39 3~2,58
8656.27 8583.00 1519.18 2421,11 N 1368.24 E 635734.57 59697[2.03 HS 0,00
8739.~7 8666.00 X562.37 2459.45 N 1348.36 E 635~14.00 5969750.00 LS 0,00
8739.97 8666.00 1562,37 2459.45 N 1348.36 E 6357~4.00 5969750.00 LS 0.00
8719.~7 8666.00 1562.37 2459.45 N 1348.36 E 635714.00 5969750.00 LS O.O0
8808.98 8755,71 1596.28 2489.55 N 1332.74 E 635697.85 5969779.81 L,S 4.00
~.J
TOP ZO}~ 3 9691.29 20.74 332.58
9700.00 20.59 332.58
END 4/[00 DROP 9709.73 20.00 332.58
9709.~4 20.00 332.58
TOP ZONE ~ 9779.66 20.00 332.58
TOP HOT 9843.5~ 20.00 332.58
OOWC 9899.9~ 20.00 332.58
'I~OP ZONII i ~0037.L9 20.00 332,58
4-1/2" LNR <JJ> /0046.$~ 20.00 332.58
TD i0046.71 20.00 332.58
8893.27 8820.00 1631,31 2520.64 N 13/6.62 g 635681.17 59698L0.61 LS 4.00
8901.42 8828.15 ~634.37 25~3.37 N 13L5.22 E 635679,72 $9698L3.30 LS 4.00
89L0,56 8837.29 1637.73 2526.34 N 13L~.66 ~ 635678.12 59698[6.27 HS 4.00
89~0.56 8837.29 ~637.73 2526.34 N 1313.66 E 635678.1~ 59698Z6.25 RS 4,00
8976.27 8903,00 1661.64 2547.57 }~ 1302,65 ~ 635666.72 5969837.28 RS 0.00
9036,27 8963.00 1683.48 2566.95 ~I 1292,59
9089,27 9016.00 1902.77 2584.0~ }I 1283,71
92[8.27 9145.00 1~49.72 2625.~6 )t 1262,09
9227.21 9~53.94 ~752.98 2628,64 It 1260.60
9227.21 9[53.94 ~952.98 2628,64 ~ 1~60.60
635656.32 5969856,48 ItS 0.00
635647.i4 5969873.~4 ES 0.00
635624.78 59699~4,72 ~S 0.00
63S623.23 5969917,58 0.00
635623.23 5969917,58 0.00
Z
7t3
I--q
ANAD,~'/. L AKA. DpC
, FEASIBILITY PLAN
NOT APPROVED ?OR
EXECUTION
PLAN
........ .(A.r~.a~l.r.1;1.1__(.~.:l .,"I..It;I_4./~P.~. 3.,.O..C_.t~_: 1.,1. J~.t..P.) ....................................................................................... ' .................................... : ......................................................................................... cx)
-13
l>
6-)
Inn
6~/04/'1997 16' 46 967-3~ 66 ANADRILL DPC PAGE 04
SHAREO SERVICES B' I"'LiN8
I VERTICAL SECTION VIEW!;
,,.., ~_ ~ '~-~
ITVO Scale.: 1 inch = 1200 fee
, i I. ' -[Oep Scale.: 1 inch = 1200 feet.
.
~ MD BKB SECTN INCL~
- ~ ~ ~ A) TIE-IN SURVEY 8295 75~
/
I
B) TOP OF WINDOW 8295 7645 ~045 2B.71
c! KOP CURVE 8/100 8300 76:~? t046 ~8.7~.
I
!
. E) 7' CSG PT <Il > 9406 863~ 1509 27.ml
)~ I F) D~OP ~/t00 9522 873F' 1562 27.~
I ~ I G] TARGET ~*~*~ 9522 873'.'~ 1562 27.
~ H) ENO 4/100 OROP 97t0 8911 1638 20.O~m
', i ~ 1) ~-1/2" LNR <11 > 10047 9227 1753 20.01
' ~ J) TD ~0047 9227 1753 20.0i
"' ' I !
x ~ i EXE,CU~
' I ' -' ~ ~-2
' .... k J-' J. ¢,LAhi _~~ ._Il.
', J ~='
. .~- ~ .....
mmmmm.
,~ --
I
600
1200
T
108
0 600 1200 1800 2400 3000 3600 4200 4800 5400 6000 6600 7200
Section Departure
7800
~9/'04/1997 10-46 907-9, 160 ANADRILL DPC PAGE 05
,
SHARED
DRILLING
SERVICES
N-~4A (P3)
VERT'I'CAL SECTION
Section at: 332.58
TVO Scale.' ~ inch = 300 feet
Oep Sca]e.'! inch = 300 feet
Brawn ' 04 Sep ~997
Anadril] Schlumbepger
Marker Identification
~) TIE-IN SURVEY
8) TOP OF WINDOW
C) KOP CURVE B/tO0
FI ORO@'4/tO0
G] TARGET ~~*~
H] END 4/100 DROP
I] 4-1/2' LNR <[1>
MB
8295
8295
8300
8675
9406
9522
@522
9710
10047
10047
BKB SECTN
7644 1045
7645 1045
764~ 1046
799[
863£ 1509
8739 1562
8739 1~62
891! 1638
9227 1753
9227 1753
,.
iVED F,..D
VIEW
INCLi
28.7~
28.7i
27.4~
:,!7.4j
27 .~!
!
27 4'.
~o.ol
2O.Ol
~o.oi
;
i
;
900 1050 i200 t350 1500
~6~0 ~Boo ~950 2too
Sect ~.on Departure
2250
2400
2550
2700
2850
3000
89704/1997
18:48
907-34, 88
-
SHAREO
ANADRILL DPC PAGE
SERV ICES DR I LLi-NG
Marker Iden[ifica[ion
Al TIE-IN SURVEY
BJ TOP OF WIND6~
C) KOP CURVE 8/100
O) ENO 8/tO0 CURVE
E) 7" CSG PT <11>
F) OROP
G) TARGET
H) ENO 4/100 DROP
I) 4-1/2" LNR <11>
dl TO
MO N/S E/~
8295 J960 i509~ L~
8295 Jg60~ t509
8300 J962 ~
8675 2i12 ~ iSil
1528
9406 2412 N 1373 E
9522 2459 N J348 E
9522 2459 N J348 E
9710 2526 N 1314 E
10047 2629 N i2G1 E
10047 2629 N 126t E
N-14A (P"',,~, '",
PLAN VIE~ '
CLOSURE ' 2915 feet at A,:imuth 25.6~
DECLINATION' +28.238 (E)
SCALE · ! inch : 500 feet
DRAWN. ' 04 Sep 1997
Anadri]l 5chlumZ arger
250 0 250 500 750 tO00 1250 1500 1750 2000 2250 2500 2750 3000 i~50
(- WEST · EAST -> i
· WELL PERMIT CHECKLIST COMPANY
FIELD & POOL ~ ~-/~:::)/;<;"~ INIT CLASS
WELL NAME ,/5,~/_--.-¢' /¢-~-//_~,,"~ PROGRAM: exp [] dev<~redrll~.serv [] wellbore seg F; ann. disposal para req
_/'-,¢~/ GEOL AREA ~ ? ~ UNIT# ,/,,/~',..~'~ ON/OFF SHORE
ADMINISTRATION
.
2.
3.
4.
5.
6.
7.
8.
9.
10.
11.
DATE ] 12.
././/_./.2;/'. ¢/~ 13.
ENGINEERING
14.
15.
16.
17.
18.
19.
20.
21.
22.
23.
24.
25.
APPR D~TE 26.
,J4
28.
29.
Permit fee attached ....................... N
Lease number appropriate ................... N
Unique well name and number .................. N
Well located in a defined pool .................. N
Well located proper distance from drilling unit boundary .... N
Well located proper distance from other wells .......... N
Sufficient acreage available in drilling unit ............ N
If deviated, is wellbore plat included ............... N
Operator only affected party ................... N
Operator has appropriate bond in force ............. N
Permit can be issued without conservation order ........ N
Permit can be issued without administrative approval ...... N
Can permit be approved before 15-day wait ........... N
REMARKS
Conductor string provided ................... Y N"~ ~
Surface casing protects all known USDWs ........... Y I~ ~ ~
CMT vol adequate to circulate on conductor & surf csg ..... Y
CMT vol adequate to tie-in long string to surf csg ........ Y N
CMT will cover all known productive horizons .......... (~
Casing designs adequate for C, T, B & permafrost .......
Adequate tankage or reserve pit .................
If a re-drill, has a 10-403 for abandonment been approved... Y N
Adequate wellbore separation proposed ............. N
If diverter required, does it meet regulations .......... N
Drilling fluid program schematic & equip list adequate ..... N
BOPEs, do they meet regulation ................ N
BOPE press rating appropriate; test to ~'O~2"g;> psig. N
Choke manifold complies w/APl RP-53 (May 84) ........ N
Work will occur without operation shutdown ........... N
Is presence of H2S gas probable ................. N
GEOLOGY
APPR
30. Permit can be issued w/o hydrogen sulfide measures ..... ~N '
31. Data presented on potential overpressure zones ....... ,
32. Seismic analysis of shallow gas zones .............
33. Seabed condition survey (if off-shore) ............. /
34. Contact name/phone for weekly progress reports ...... /. Y N
[exploratory only] "~
GEOLOGY: ENGINEER.lNG: COMMISSION:
"~' ~ JDH ~ RNC~
CO ~
Comments/InstrUctions:
HOW/Ijt - A:\FORMS\cheklist rev 09/97
Well History File
APPENDIX
Information of detailed nature that is not
particularly germane to the Well Permitting Process
but is part of the history file.
To improve the readability of the Well History file and to
simplify finding information, information-of this
nature is accumulated at the end of the file under APPENDIX.
No special effort has been made to chronologically
·
organize this category of information.
* ALASKA COMPUTING CENTER *
....... SCHLUMBERGER
COMPANY NAME : BP EXPLORATION (ALASKA)
WELL NAME : N-14A
FIELD NAi~IE : PRUDHOE BAY
BOROUGH : NORTH SLOPE
STATE · ALASKA
API NDIVlBER : 500292059401
REFERENCE NO : 98593
RECEIVED
._
DEC 0,% 1998
&qc~ge
LIS Tape Verification Listing
Schlumberger Alaska Computing Center
25-NOV-1998 08:23
PAGE:
**** REEL HEADER ****
SERVICE NAME : EDIT
DATE : 98/11/24
ORIGIN : FLIC
REEL NAFiE '. 98593
CONTINUATION #
PREVIOUS REEL
COM~4~29~f : BP EXPLORATION, N-14A, PRUDHOE BAY, API #50-029-20594-01
**** TAPE HEADER ****
SERVICE NAM~ : EDIT
DATE : 98/11/24
ORIGIN : FLIC
TAPE NAME : 98593
CONTINUATION # : 1
PREVIOUS TAPE :
COM~IFJ~T : BP EXPLORATION, N-14A, PRUDHOE BAY, API #50-029-20594-01
TAPE HEADER
PRUDHOE BAY
MWD/MAD LOGS
WELL NAM~ :
API AU]FiBER:
OPERATOR:
LOGGING COMPANY:
TAPE CREATION DATE:
JOB DATA
JOB NUMBER:
LOGGING ENGINEER:
OPERATOR WITNESS:
SURFACE LOCATION
SECTION:
BIT RUN 1
98593
A NUTTER
C RUSSEL
TOWNSHIP:
RANGE:
FNL:
FSL:
FEL:
FWL:
ELEVATION (FT FROM MSL O)
KELLY BUSHING:
DERRICK FLOOR:
GROUND LEVEL:
WELL CASING RECORD
1ST STRING
2ND STRING
N-14A
500292059401
BP Exploration (Alaska)
SCHLUMBERGER WELL SERVICES
24-NOV-98
BIT RUN 2 BIT RUN 3
8
liN
13E
74.47
73.06
43.57
OPEN HOLE CASING DRILLERS
BIT SIZE (IN) SIZE (IN) DEPTH (FT)
9.675 8293.0
8.500 7.000 9406.0
LIS Tape Verification Listing
Schlumberger Alaska Computing Center
25-NOV-1998 08:23
3RD STRING 6. 000
PRODUCTION STRING
4.500 10047.0
CONTAINED HEREIN IS THE LDWG FORMATTED LWD GR/IMPULSE
DATA AQUIRED ON BP EXPLORATION'S N-14A WELL.
$
$
PAGE:
**** FILE HEADER ****
FILE NA~E : EDIT .001
SERVICE : FLIC
VERSION : O01CO1
DATE : 98/11/24
MAX REC SIZE : 1024
FILE TYPE : LO
LAST FILE :
FILE HEADER
FILE NUf4~ER: 1
EDITED MERGEDMWD
Depth shifted and clipped curves; all bit runs merged.
DEPTH INCREMENT: 0.5000
FILE SOYdMARY
LDWG TOOL CODE
$
BASELINE CURVE FOR SHIFTS: GR
CURVE SHIFT DATA (PIEASUREDDEPTH)
START DEPTH STOP DEPTH
9966.0 8320.0
BASELINE DEPTH
88888.0
9894 5
9880 0
9870 0
9858 0
9844 0
9828 0
9825 5
9810 5
9788 5
9774.5
9764.0
9740.0
9716.5
9712.5
9711.0
9705.5
9694.0
9683.0
.......... EQUIVALENT UNSHIFTED DEPTH
MWD
.......
88894.0
9900.5
9884.5
9874.5
9861.5
9848.0
9835.0
9832.5
9819.0
9796.0
9782.0
9771.0
9747.0
9724 0
9719 5
9716 5
9709 5
9700 0
9690 5
LIS Tape Verification Listing
Schlumberger Alaska Computing Center
9677.0
9667.0
9651.0
9650.0
9647.5
9643.5
9627.0
9624.5
9615.0
9609.0
9602.0
9597.5
9591.5
9579.0
9565.5
9559.5
9557.0
9547.5
9544.5
9542.5
9536.0
953 O. 5
9523.5
9519.0
9515.5
9510.0
9507.5
9502.5
9497.0
9493.5
9489.5
9487.0
9483.5
9475.0
9473.0
9469.5
9468.0
9462.5
9459.5
9457.5
9452.5
9450.0
9443.0
9434.5
9429.0
9427.0
9425.5
9409.5
9394.0
9388.0
9385.5
9367.5
9360.0
9343.0
9308.0
9684.0
9672.5
9658.0
9655.5
9653.0
9649.0
9632 5
9630 0
9621 0
9615 0
9608 0
9603 0
9597 0
9583 5
9570 5
9565.5
9563.0
9553.0
9548.5
9547.5
9541.5
9535.0
9530. 5
9523.0
952 O. 0
9514.5
9511.5
9506.0
9501.0
9498.0
9493.5
9490.5
9487.0
9479.0
9476.5
9473.5
9471.5
9466.0
9464.0
9460.5
9456.5
9452.5
9446.5
9437.5
9432.5
9430.5
9427.5
9412.0
9398.0
9390.5
9388.0
9371.5
9365.5
9351.5
9311.5
25-NOV-1998 08:23
PAGE:
LIS Tape Verification Listing
Schlumberger Alaska Computing Center
9304.0
9296.5
9274.0
9258.5
9241.5
9215.5
9205.0
9201.0
9198.5
9186.0
9176.5
9162.0
9129.0
9107.5
9067.5
9058.0
9028.5
9017.5
9003.0
8980.0
8977.5
8958.5
8953.0
8950.0
8946.5
8941.5
8938.0
8927.0
8920.5
8911.0
8906.0
8901.5
8898.5
8891.5
8873.5
8870.5
8868.0
8859.0
8849.0
8846.0
8833.0
8829.0
8819.5
8810.5
8799.5
8797.0
8795.5
8792.0
8787.5
8773.5
8768.5
8764.5
8760.5
8754.5
8730.0
9307.5
9301.0
9281.5
9266.0
9250.0
9222.5
9212.5
9208.0
9207.0
9192.5
9182.5
9169.0
9137.0
9115.0
9075.0
9065.0
9036.0
9024.5
9011.0
8987.0
8985.0
8967.5
8960.5
8957.0
8955.5
8949.0
8946.0
8934.0
8925.5
8918.5
8913.0
8908.0
8905.0
8897.5
8881.5
8877 5
8875 0
8866 5
8855 5
8852 5
8840 0
8837 0
8827 0
8816 5
8806 0
8803 5
8800 5
8798.5
8794.0
8780.0
8776.0
8771.5
8767.0
8761.5
8737.0
25-NOV-1998 08:23
PAGE:
LIS Tape Verification Listing
Schlumberger Alaska Computing Center
25-NOV-1998 08:23
PAGE:
8719.0 8726.5
8700.0 8707.0
8692.5 8702.0
8642.5 8649.0
8630.5 8637.0
8613.5 8621.0
8551.0 8557.0
8550.0 8555.0
8539.0 8544.5
8523.0 8525.5
8518.0 8522.5
8515.5 8519.5
8511.5 8517.0
8507.5 8511.5
8499.0 8502.5
8493.0 8494.5
8469.5 8473.5
8454.0 8457.5
8437.0 8441.5
8428.0 8432.0
8394.0 8399.0
8392.0 8396.5
8365.5 8369.0
8356.0 8361.5
8348.5 8353.5
8323.5 8328.0
100.0 104.5
$
MERGED DATA SOURCE
LDWG TOOL CODE
$
REMARKS:
BIT RUN NO. MERGE TOP MERGE BASE
1 8317.0 9406.0
2 9406.0 9960.0
THIS FILE CONTAINS THE EDITED DATA. THE DEPTH SHIFTS
SHOWN ABOVEREFLECT CORRELATIONS BETWEEN THE MWD GAM~A
RAY AND THE AIT GR LOGGED BY SCHLUMBERGER ON 21-JUN-98.
ALL MWD CURVES WERE CARRIED WITH THE GR SHIFTS. THE
TWO RUNS HAVE BEEN FIERGED AND CLIPPED OF INVALID COUNTS
AT FIRST READINGANDATLAST READING.
$
LIS FORMAT DATA
LIS Tape Verification Listing
Schlumberger Alaska Computing Center
25-NOV-1998 08:23
PAGE: 6
** DATA FORMAT SPECIFICATION RECORD **
** SET TYPE- 64EB **
TYPE REPR CODE VALUE
1 66 0
2 66 0
3 73 36
4 66 1
5 66
6 73
7 65
8 68 0.5
9 65 FT
11 66 28
12 68
13 66 0
14 65 FT
15 66 68
16 66 1
0 66 0
** SET TYPE - CHAN **
NAME SERV UNIT SERVICE API API API API FILE NUMB NUMB SIZE REPR PROCESS
ID ORDER # LOG TYPE CLASS MOD NUPi~ SAMP ELEM CODE (HEX)
DEPT FT O0 000 O0 0 1 1 1 4 68 0000000000
FET MWD HR O0 000 O0 0 1 1 1 4 68 0000000000
ROP MWD FPHR O0 000 O0 0 1 1 1 4 68 0000000000
GR MWD GAPI O0 000 O0 0 1 1 1 4 68 0000000000
RPS MWD OH~4~ O0 000 O0 0 1 1 1 4 68 0000000000
RPM MWD OH~ O0 000 O0 0 1 1 1 4 68 0000000000
RPD MWD OH~4 O0 000 O0 0 1 1 1 4 68 0000000000
RPX MWD 0H~74 O0 000 O0 0 1 1 1 4 68 0000000000
RPXXMWD OH~ O0 000 O0 0 1 1 1 4 68 0000000000
** DATA **
DEPT. 9966.000 FET.MWD -999.250 ROP.MWD 27.660 GR.MWD -999.250
RPS.MWD -999.250 RPM. MWD -999.250 RPD.MWD -999.250 RPX.MWD -999.250
RP3Cf. MWD -999.250
DEPT. 8320.000 FET.MWD -999.250 ROP.MWD -999.250 GR.MWD 62.170
RPS.MWD -999.250 RPM. MWD -999.250 RPD.MWD -999.250 RPX. MWD -999.250
RPXX.MWD -999.250
** END OF DATA **
LIS Tape Verification Listing
Schlumberger Alaska Computing Center
25-NOV-1998 08:23
PAGE:
**** FILE TRAILER ****
FILE NAME : EDIT .001
SERVICE : FLIC
VERSION : O01CO1
DATE : 98/11/24
MAX REC SIZE : 1024
FILE TYPE : LO
LAST FILE :
**** FILE HEADER ****
FILE NAM~ : EDIT .002
SERVICE : FLIC
VERSION : O01CO1
DATE : 98/11/24
MAX REC SIZE : 1024
FILE TYPE : LO
LAST FILE :
FILE HEADER
FILE ~ER 2
RAW MWD
Curves and log header data for each bit run in separate files.
BIT RUN ~ER: 1
DEPTH INC~: 0.5000
FILE SUM~zARY
VENDOR TOOL CODE START DEPTH STOP DEPTH
9406.0 8315.5
LOG HEADER DATA
DATE LOGGED: 21-JUN-98
SOFTWARE:
SURFACE SOFTWARE VERSION: V5 69R
_
DOWArHOLE SOFTWARE VERSION: VS. lB
DATA TYPE (MEMORY or REAL- TIME): REAL- TIME
TD DRILLER (FT): 9960.0
TOP LOG INTERVAL (FT): 8315.0
BOTTOM LOG INTERVAL (FT) : 9960.0
BIT ROTATING SPEED (RPM) :
HOLE INCLINATION (DEG)
MINIMUM ANGLE: 22.6
MAXIMUM ANGLE: 28.8
TOOL STRING (TOP TO BOTTOM)
VENDOR TOOL CODE TOOL TYPE
GR GAMMA RAY
IMP RESISTIVITY
$
TOOL NUMBER
MiO 276
IMPULSE 475 015
LIS Tape Verification Listing
Schlumberger Alaska Computing Center
25-NOV-1998 08:23
PAGE:
BOREHOLE AND CASING DATA
OPEN HOLE BIT SIZE (IN):
DRILLERS CASING DEPTH (FT) :
8.500
8293.0
BOREHOLE CONDITIONS
MUD TYPE:
MUD DENSITY (LB/G):
MUD VISCOSITY (S) :
MUD PH:
MUD CHLORIDES (PPM) :
FLUID LOSS (C3):
RESISTIVITY (OH~4) AT TEMPERATURE (DEGF) :
MUD AT MEASURED TEMPERATURE (MT):
MUD AT MAX CIRCULATIONG TEMPERATURE :
MUD FILTRATE AT (MT):
MUD CAKE AT (MT):
QUIKDRLN
8.80
NEUTRON TOOL
MATRIX:
MATRIX DENSITY:
HOLE CORRECTION (IN):
TOOL STANDOFF (IN):
EWR FREQUENCY (HZ):
20000
REMARKS: ************ RUN1 *************
INTERVAL DRILLED FROM 8315 FT TO 9406 FT
MWD S/N276 software version 5.lb
Ideal/SPM software version 5.0 69r
_
Bit to sensor offsets are as follows:
Gamma ray - 53.55 ft
Survey - 55.54 ft
Gamma ray corrected for bit size and mud weight
Data transmitted in Real Time only.
Missing GR data 8961-8972 due to pump noise.
************ RUN 2 **************
Interval Drilled from 9406 ft to 9960 ft.
Impulse s/n 015 software version 5.0_69r
Bit to sensor offsets are as follows:
Gamma ray - 55.35 ft
Survey - 53.18 ft
Resistivity - 47.98 ft
Gamma ray corrected for bit size and mud weight.
Resistivity Borehole Compensated.
Data from downhole recorded memory.
Thank you for choosing Anadrill Schlumberger.
THIS FILE CONTAINS THE RAW DATA FOR RUN #1.
$
LIS FORMAT DATA
LIS Tape Verification Listing
Schlumberger Alaska Computing Center
25-NOV-1998 08:23
PAGE:
** DATA FORMAT SPECIFICATION RECORD **
** SET TYPE - 64EB **
TYPE REPR CODE VALUE
1 66 0
2 66 0
3 73 20
4 66 1
5 66
6 73
7 65
8 68 0.5
9 65 FT
11 66 51
12 68
13 66 0
14 65 FT
15 66 68
16 66 1
0 66 1
** SET TYPE - CHAN **
NA~iE SERV UNIT SERVICE API API API API FILE NUMB NUMB SIZE REPR PROCESS
ID ORDER # LOG TYPE CLASS MOD NUPiB SAMP ELaM CODE (HEX)
DEPT FT O0 000 O0 0 2 1 1 4 68 0000000000
TVDE LWi FT O0 000 O0 0 2 1 1 4 68 0000000000
GRRW LW1 GAPI O0 000 O0 0 2 1 1 4 68 0000000000
ROP5 LW1 F/HR O0 000 O0 0 2 1 1 4 68 0000000000
GRIN LW1 GAPI O0 000 O0 0 2 1 1 4 68 0000000000
** DATA **
DEPT. 9406.000
GRIN. LW1 -999.250
DEPT. 8315.500
GRIN. LW1 62.170
TVDE. LW1 8641 . 330 GRRW. LW1 -999. 250 ROPS. LW1
TVDE.LW1 7662.021 GRRW. LW1 62.170 ROP$.LW1
106.490
-999.250
** END OF DATA **
LIS Tape Verification Listing
Schlumberger Alaska Computing Center
25-NOV-1998 08:23
PAGE:
10
**** FILE TRAILER ****
FILE NA~fl¢ : EDIT .002
SERVICE · FLIC
VERSION : O01CO1
DATE : 98/11/24
MAX REC SIZE : 1024
FILE TYPE : LO
LAST FILE :
**** FILE HEADER ****
FILE NAME : EDIT .003
SERVICE : FLIC
VERSION : O01CO1
DATE : 98/11/24
MAX REC SIZE : 1024
FILE TYPE : LO
LAST FILE :
FILE HEADER
FILE NUMBER 3
RAW MWD
Curves and log header data for each bit run in separate files.
BIT RUN NUMBER: 2
DEPTH INCREMENT: 0.5000
FILE SU~ff~ARY
VENDOR TOOL CODE START DEPTH STOP DEPTH
9960.0 9350.0
LOG HEADER DATA
DATE LOGGED: 21-JUN-98
SOFTWARE:
SURFACE SOFTWARE VERSION: V$ 69R
_
DOWNHOLE SOFTWARE VERSION: VS. lB
DATA TYPE (M~MORY or REAL-TIME): REAL-TIME
TD DRILLER (FT) : 9960.0
TOP LOG INTERVAL (FT) : 8315.0
BOTTOM LOG INTERVAL (FT) : 9960.0
BIT ROTATING SPEED (RPM) :
HOLE INCLINATION (DEG)
MINIMUM ANGLE: 22.6
MAXIMUM ANGLE: 28.8
TOOL STRING (TOP TO BOTTOM)
VENDOR TOOL CODE TOOL TYPE
GR GAMMA RAY
IMP RESISTIVITY
$
TOOL NUMBER
MIO 276
IMPULSE 475 015
LIS Tape Verification Listing
Schlumberger Alaska Computing Center
25-NOV-1998 08:23
PAGE: 11
BOREHOLE AND CASING DATA
OPEN HOLE BIT SIZE (IN)
DRILLERS CASING DEPTH (FT)
8.500
8293.0
BOREHOLE CONDITIONS
MUD TYPE:
MUD DENSITY (LB/G):
MUD VISCOSITY (S) :
MUD PH:
MUD CHLORIDES (PPM) :
FLUID LOSS (C3):
RESISTIVITY (OPE4M) AT TEMPERATURE (DEGF) :
MUD AT MEAStrRJF~ TEMPERATURE (MT):
MUD AT MAX CIRCULATIONG TEMPERATURE :
MUD FILTRATE AT (MT):
MUD CAKE AT (MT):
Q U I KD RLN
8.80
NEUTRON TOOL
MATRIX:
MATRIX DENSITY:
HOLE CORRECTION (IN):
TOOL STANDOFF (IN)
EWR FREQUENCY (HZ)
20000
R~IMAID~S: ************ RU1V1
INTERVAL DRILLED FROM 8315 FT TO 9406 FT
MWD S/N 276 software version 5.lb
Ideal/SPM software version 5.0 69r
_
Bit to sensor offsets are as follows:
Gamma ray - 53.55 ft
Survey - 55.54 ft
Gamma ray corrected for bit size and mud weight
Data transmitted in Real Time only.
Missing GR data 8961-8972 due to pump noise.
************ RUN2 **************
Interval Drilled from 9406 ft to 9960 ft.
Impulse s/n 015 software version 5.0_69r
Bit to sensor offsets are as follows:
Gamma ray - 55.35 ft
Survey - 53.18 ft
Resistivity - 47.98 ft
Gamma ray corrected for bit size and mud weight.
Resistivity Borehole Compensated.
Data from downhole recorded memory.
Thank you for choosing Anadrill Schlumberger.
THIS FILE CONTAINS THE RAW DATA FOR RUN #2.
$
LIS FORMAT DATA
LIS Tape Verification Listing
Schlumberger Alaska Computing Center
25-NOV-1998 08:23
PAGE:
12
** DATA FORMAT SPECIFICATION RECORD **
** SET TYPE- 64EB **
TYPE REPR CODE VALUE
1 66 0
2 66 0
3 73 64
4 66 1
5 66
6 73
7 65
8 68 0.5
9 65 FT
11 66 16
12 68
13 66 0
14 65 FT
15 66 68
16 66 1
0 66 1
** SET TYPE - CHAN **
NAME SERV UNIT SERVICE API API API API FILE NUMB NUMB SIZE REPR PROCESS
ID ORDER # LOG TYPE CLASS MOD NUMB SAMP ELEM CODE (HEX)
DEPT FT O0 000 O0 0 3 1 1 4 68 0000000000
TVDE LW2 FT O0 000 O0 0 3 1 1 4 68 0000000000
GR LW2 GAPI O0 000 O0 0 3 1 1 4 68 0000000000
TABR LW2 O0 000 O0 0 3 1 1 4 68 0000000000
P34H LW2 OP~4M O0 000 O0 0 3 1 1 4 68 0000000000
P31H LW2 O0 000 O0 0 3 1 1 4 68 0000000000
P28H LW2 OH~ O0 000 O0 0 3 1 1 4 68 0000000000
P22H LW2 OPL~M O0 000 O0 0 3 1 1 4 68 0000000000
P16H LW2 Ot{~f O0 000 O0 0 3 1 1 4 68 0000000000
PiOH LW2 OHMM O0 000 O0 0 3 1 1 4 68 0000000000
A34H LW2 O0 000 O0 0 3 1 1 4 68 0000000000
A31H LW2 O0 000 O0 0 3 1 1 4 68 0000000000
A28H LW2 O0 000 O0 0 3 1 1 4 68 0000000000
A22H LW2 O0 000 O0 0 3 1 1 4 68 0000000000
MTEMLW2 DEGF O0 000 O0 0 3 1 1 4 68 0000000000
ROP5 LW2 F/HR O0 000 O0 0 3 1 1 4 68 0000000000
** DATA **
DEPT. 9960.000 TVDE.LW2 9150.430 GR.LW2 -999.250 TABR.LW2
P34H.LW2 -999.250 P31H.LW2 -999.250 P28H.LW2 -999.250 P22H. LW2
P16H. LW2 -999.250 PIOH.LW2 -999.250 A34H. LW2 -999.250 A31H. LW2
A28H.LW2 -999.250 A22H. LW2 -999.250 MTEM. LW2 -999.250 ROPS.LW2
-999.250
-999.250
-999.250
27.660
LIS Tape Verification Listing
Schlumberger Alaska Computing Center
25-NOV-1998 08:23
PAGE:
13
DEPT. 9350. 000 TVDE. LW2
P34H. LW2 1 . O00 P31H. LW2
P16H. LW2 O. 210 P1 OH. LW2
A28H. LW2 300. 000 A22H. LW2
8590. 541 GR. LW2
O. 700 P28H. LW2
O. 180 A34H. LW2
300. 000 MTEM. LW2
63.860 TABR. LW2
O. 1 O0 P22H. LW2
300. 000 A31H. LW2
129.200 ROPS. LW2
1.006
0.200
300.000
61.260
** END OF DATA **
**** FILE TRAILER ****
FILE NAME : EDIT .003
SERVICE : FLIC
VERSION : O01CO1
DATE : 98/11/24
MAX REC SIZE : 1024
FILE TYPE : LO
LAST FILE :
**** TAPE TRAILER ****
SERVICE NAME : EDIT
DATE : 98/11/24
ORIGIN : FLIC
TAPE NAME : 98593
CONTINUATION # : 1
PREVIOUS TAPE :
CO~ElqT : BP EXPLORATION, N-14A, PRUDHOE BAY, API #50-029-20594-01
**** REEL TRAILER ****
SERVICE NAFiE : EDIT
DATE : 98/11/24
ORIGIN : FLIC
REEL NAME : 98593
CONTINUATION # :
PREVIOUS REEL :
COM~fENT : BP EXPLORATION, N-14A, PRUDHOE BAY, API #50-029-20594-01
DNI
LIS Tape Verification Listing
Schlumberger Alaska Computing Center
17-NOV-1998 10:44
**** REEL HEADER ****
SERVICE NA~E : EDIT
DATE : 98/11/17
ORIGIN : FLIC
REEL NA~I~ : 98594
CONTINUATION # :
PREVIOUS REEL :
COF~FT : BP EXPLORATION, N-14A, PRUDHOE BAY, API# 50-029-20594-01
PAGE:
**** TAPE HEADER ****
SERVICE NAME : EDIT
DATE : 98/11/17
ORIGIN : FLIC
TAPE NAME : 98594
CONTINUATION # : 1
PREVIOUS TAPE :
COMPIENT : BP EXPLORATION, N-14A, PRUDHOE BAY, API# 50-029-20594-01
TAPE HEADER
PRUDHOE BAY
CASED HOLE WIRELINE LOGS
WELL NA~E : N-14A
API NUMBER: 500292059401
OPERATOR: BP EXPLORATION, (ALASKA) , INC
LOGGING COMPANY: SCHLUMBERGER WELL SERVICES
TAPE CREATION DATE: 17 -NOV- 98
JOB NU~UBER: 98594
LOGGING ENGINEER: PALMER
OPERATOR WITNESS: RATHERT
SURFACE LOCATION
SECTION: 8
TOWNSHIP: 1 iN
RANGE: 13 E
FNL : 3917
FSL:
FEL: 4731
FWL:
ELEVATION (FT FROM MSL O)
KELLY BUSHING: 74.47
DERRICK FLOOR:
GROUND LEVEL:
WELL CASING RECORD
OPEN HOLE CASING DRILLERS CASING
BIT SIZE (IN) SIZE (IN) DEPTH (FT) WEIGHT (LB/FT)
1ST STRING 6. 000 4. 500 9959.0
2ND STRING
3RD STRING
PRODUCTION STRING
CURVE SHIFT DATA - ALL PASSES TO STANDARD (MEAStrRED DEPTH)
LIS Tape Verification Listing
Schlumberger Alaska Computing Center
17-NOV~1998 10:44
BASELINE CURVE FOR SHIFTS
LDWG TOOL CODE: AIT
LDWG CURVE CODE: GR
RUN NUMBER:
PASS NUMBER:
DATE LOGGED: 21-JUN-98
LOGGING COMPANY: SCHLUFiBERGER WELL SERVICES
BASELINE DEPTH
88888.0
9734.5
9728.5
9726.0
9721.0
9720.5
9703.0
9700.5
9689.5
9689.0
9687.0
9683.0
9670.5
9662.5
9657.0
9653.5
9639.0
9633.0
9631.5
9630.5
9626.5
9622.0
9616.0
9615.5
9604 5
9599 0
9598 0
9594 5
9591 5
9588 0
9586 0
9582.0
9574.0
9573.0
9572.5
9571.0
9563.5
9553.5
9552.5
9550.5
9549.0
9542.5
9540.5
9539.5
9537.5
.......... EQUIVALENT UNSHIFTED DEPTH ..........
GRCH RST
88887.5 88886.0
9728.0
9725.0
9719.5
9700.0
9698.5
9688.5
9686.0
9681.5
9668.5
9655.5
9638.5
9630.0
9615.0
9603.0
9596.5
9593.0
9583.5
9580.0
9573.5
9571.0
9552.5
9549.0
9541.5
9538.0
9732.5
9719.5
9700.0
9688.0
9664.0
9653.0
9633.0
9630.0
9626.0
9621.0
9615.0
9596.5
9589.5
9586.5
9584.0
9573.0
9571.0
9563.0
9552.5
9549.0
9541.0
9538.5
PAGE:
LIS Tape Verification Listing
Schlumberger Alaska Computing Center
17-NOV-1998 10:44
9537.0 9535.0
9536.0 9535.0
9535.0 9533.0
9531.5 9530.5
9530.5 9531.0
9528.5 9526.5
9527.5 9525.5
9525.0 9523.0
9521.0 9519.5
9516.5 9514.5
9516.0 9515.0
9513.5 9511.5
9509.5 9506.5
9505.0 9503.0
9503.5 9501.0
9500.5 9498.0
9498.0 9495.0
9497.5 9495.0
9490.5 9487.5
9489.5 9487.5
9486.5 9483.5
9484.5 9483.5
9479 . 5 9476.5
100.0 97.0 99.0
REMARKS:
CONTAINED HEREIN IS THE LDWG FORMATTED CASED HOLE RST
DATA AQUIRED ON BP EXPLORATION'S N-i4A WELL. THE DEPTH
SHIFTS SHOWN ABOVE REFLECT CORRELATIONS BETWEEN GRCH
BASE PASS #1 AND THE AIT GAI~VlA RAY, ALSO BASE PASS #1
SIGMA AND THE AIT GAM~A RAY, CARRYING ALL RST CURVES
WITH THE SIGMA SHIFTS.
$
$
PAGE:
**** FILE HEADER ****
FILE NAME : EDIT .001
SERVICE : FLIC
VERSION ' O01CO1
DATE . 98/11/17
MAX REC SIZE : 1024
FILE TYPE : LO
LAST FILE :
FILE HEADER
FILE NIIMBER: 1
EDITED CURVES
Depth shifted and clipped curves for each pass in separate files.
PASS NUMBER: 1
DEPTH INCREMENT: 0.5000
FILE SUFk4ARY
LDWG TOOL CODE START DEPTH STOP DEPTH
LIS Tape Verification Listing
Schlumberger Alaska Computing Center
17-NOV-1998 10:44
PAGE:
GRCH 9729.5 9473.0
RST 9739.0 9475.0
$
CURVE SHIFT DATA - PASS TO PASS (M~ASURED DEPTH)
BASELINE CURVE FOR SHIFTS
LDWG CURVE CODE:
PASS NUMBER:
BASELINE DEPTH
.......... EQUIVALENT UNSHIFTED DEPTH ..........
GRCH RST
REMARKS: THIS FILE CONTAINS CASED HOLE RST BASE PASS #1. THERE
ARE NO PASS TO PASS SHIFTS APPLIED TO THIS DATA.
$
LIS FORMAT DATA
** DATA FORMAT SPECIFICATION RECORD **
** SET TYPE - 64EB **
TYPE REPR CODE VALUE
1 66 0
2 66 0
3 73 92
4 66 1
5 66
6 73
7 65
8 68 0.5
9 65 FT
11 66 11
12 68
13 66 0
14 65 FT
15 66 68
16 66 1
0 66 0
** SET TYPE - CHAN **
NAME SERV UNIT SERVICE API API API API FILE NUM~ NUMB SIZE REPR PROCESS
ID ORDER # LOG TYPE CLASS MOD NUM~ SAMP ELEM CODE (HEX)
DEPT FT 118933 O0 000 O0 0 1 1 1 4 68 0000000000
NBAC RST CPS 118933 O0 000 O0 0 1 1 1 4 68 0000000000
LIS Tape Verification Listing
Schlumberger Alaska Computing Center
17-NOV-1998 10:44
PAGE:
NAIVE SERV UNIT SERVICE API API API API FILE NUA~ NUM~ SIZE REPR PROCESS
ID ORDER # LOG TYPE CLASS MOD NUFiB SAMP ELEM CODE (HEX)
O0 000 O0 0 1 1 1 4 68 0000000000
FBAC RST CPS 118933
SBNA FIL CU 118933 O0 000 O0 0 1 1 1 4 68 0000000000
SFNA FIL CU 118933 O0 000 O0 0 1 1 1 4 68 0000000000
SBFA FIL CU 118933 O0 000 O0 0 1 1 1 4 68 0000000000
SFFA FIL CU 118933 O0 000 O0 0 1 1 1 4 68 0000000000
TRAT FIL 118933 O0 000 O0 0 1 1 1 4 68 0000000000
IRAT FIL 118933 O0 000 O0 0 1 1 1 4 68 0000000000
CIRNFIL 118933 O0 000 O0 0 1 1 1 4 68 0000000000
CIRF FIL 118933 O0 000 O0 0 1 1 1 4 68 0000000000
BSAL RST PPK 118933 O0 000 O0 0 1 1 1 4 68 0000000000
SIBF RST CU 118933 O0 000 O0 0 1 1 1 4 68 0000000000
TPHI RST PU-S 118933 O0 000 O0 0 1 1 1 4 68 0000000000
SFFC RST CU 118933 O0 000 O0 0 1 1 1 4 68 0000000000
SFNC RST CU 118933 O0 000 O0 0 1 1 1 4 68 0000000000
SIGM RST CU 118933 O0 000 O0 0 1 1 1 4 68 0000000000
DSIG RST CU 118933 O0 000 O0 0 1 1 1 4 68 0000000000
FBEF RST UA 118933 O0 000 O0 0 1 1 1 4 68 0000000000
CRRA RST 118933 O0 000 O0 0 1 1 1 4 68 0000000000
GRCH RST GAPI 118933 O0 000 O0 0 1 1 1 4 68 0000000000
TENS RST LB 118933 O0 000 O0 0 1 1 1 4 68 0000000000
CCL RST V 118933 O0 000 O0 0 1 1 1 4 68 0000000000
** DATA **
DEPT. 9739.000 NBAC.RST 1902.139 FBAC.RST 3424.956 SBNA.FIL
SFNA.FIL 14.216 SBFA.FIL 42.870 SFFA.FIL 13.168 TRAT. FIL
IRAT. FIL 0.476 CIRN. FIL 1.303 CIRF. FIL 3.419 BSAL.RST
SIBF. RST 46.247 TPHI.RST 18.552 SFFC.RST 12.688 SFNC. RST
SIGM. RST 12.654 DSIG.RST 0.098 FBEF. RST 54.088 CRRA.RST
GRCH. RST -999.250 TENS.RST 1129.000 CCL.RST 0.000
DEPT. 9473.000 NBAC.RST -999.250 FBAC.RST -999.250 SBNA.FIL
SFNA.FIL -999.250 SBFA.FIL -999.250 SFFA.FIL -999.250 TRAT.FIL
IRAT. FIL -999.250 CIRN. FIL -999.250 CIRF. FIL -999.250 BSAL.RST
SIBF. RST -999.250 TPHI.RST -999.250 SFFC.RST -999.250 SFNC.RST
SIGM. RST -999.250 DSIG.RST -999.250 FBEF. RST -999.250 CRRA.RST
GRCH. RST 86.536 TENS.RST -999.250 CCL.RST -999.250
60.535
0.791
67.653
12.815
2.075
-999.250
-999.250
-999.250
-999.250
-999.250
** END OF DATA **
LIS Tape Verification Listing
Schlumberger Alaska Computing Center
17-NOV-1998 10:44
PAGE:
**** FILE TRAILER ****
FILE NAME : EDIT .001
SERVICE : FLIC
VERSION : O01CO1
DATE : 98/11/17
MAX REC SIZE : 1024
FILE TYPE : LO
LAST FILE :
**** FILE HEADER ****
FILE NAME : EDIT .002
SERVICE : FLIC
VERSION : O01CO1
DATE : 98/11/17
MAX REC SIZE : 1024
FILE TYPE : LO
LAST FILE :
FILE HEADER
FILE NUMBER: 2
EDITED CURVES
Depth shifted and clipped curves for each pass in separate files.
PASS NUMBER: 2
DEPTH INCREMENT: 0. 5000
FILE SUA94ARY
LDWG TOOL CODE START DEPTH STOP DEPTH
GRCH 9712.5 9464.0
RST 9725.0 9466.5
$
CURVE SHIFT DATA - PASS TO PASS (MEASURED DEPTH)
BASELINE CURVE FOR SHIFTS
LDWG CURVE CODE: GRCH
PASS NUMBER: 1
BASELINE DEPTH
88888.0
9719.5
9712.0
9707.0
9705.0
9702.5
9700.0
9692.5
9688.5
9686.5
9683.5
.......... EQUIVALENT UNSHIFTED DEPTH
GRCH RST
88886.5 88888 0
9719 5
9711 5
9707 0
9704 5
9702 5
9698.5
9686.5
9692.0
9688.0
9683.5
LIS Tape Verification Listing
Schlumberger A1 aska Compu ting Center
17-NOV-1998 10:44
PAGE:
9683.0
9670.0
9662.5
9659.5
9656.0
9655.0
9653.0
9650.0
9645.0
9636.5
9632.0
9630.5
9630.0
9628.5
9623.5
9622.0
9621.0
9617.0
9615 0
9607 5
9604 5
9603 5
9600 0
9595 5
9595 0
9585 5
9585 0
9583 0
9578 5
9572 5
9572.0
9570.5
9566.5
9565.0
9564.0
9563.0
9561.0
9560.0
9557.5
9553.0
9552.0
9548.5
9542.0
9540.5
9537.5
9536.5
9535.5
9533.5
9530.5
9530.0
9528.0
9527.0
9526.5
9524.5
9523.5
9681.5
9668.5
9658.0
9655.0
9649.5
9630.0
9628.5
9623.5
9621.0
9615.0
9608.0
9603.5
9598.5
9592.5
9583.5
9576.0
9571.0
9566.0
9563.0
9560.5
9555.5
9552.5
9541.5
9535.0
9530.5
9526.5
9525.5
9523.0
9664.5
9655.5
9653.0
9645.5
9637.5
9633.0
9630.5
9621.0
9617.5
9615.0
9603.5
9594.5
9584.0
9581.5
9573.5
9571.0
9566.0
9563.0
9560.0
9552.5
9549.0
9541.5
9539.0
9535.0
9533.5
9531.0
9527.5
9523.5
LIS Tape Verification Listing
Schlumberger Alaska Computing Center
17-NOV-1998 10:44
PAGE:
9518
9515
9504
9502
9499
9497
9495.
9494.
9493.
9489.
9488.
9485.
9483.
9481.
100.
0 9517.0 9517.5
5 9514.0 9515.5
5 9502.5
5 9501.0
0 9498.0 9497.5
0 9495.0
5 9493.5
5 9493.0
0 9491.0
5 9487.5
5 9487.5
5 9483.5
0 9483.5
0 9479.0
0 98.0 100.5
REMARKS: THIS FILE CONTAINS CASED HOLE RST BASE PASS #2. THE
DEPTH SHIFTS SHOWN ABOVEREFLECT CORRELATIONS BETWEEN
GRCH BASE PASS #2 AND GRCH BASE PASS #1, ALSO SIGMA
BASE PASS #2 AND SIGMA BASE PASS #1, CARRYING ALL
RST CURVES WITH THE SIGMA SHIFTS.
$
LIS FORMAT DATA
** DATA FORMAT SPECIFICATION RECORD **
** SET TYPE - 64EB **
TYPE REPR CODE VALUE
1 66 0
2 66 0
3 73 92
4 66 1
5 66
6 73
7 65
8 68 0.5
9 65 FT
11 66 11
12 68
13 66 0
14 65 FT
15 66 68
16 66 1
0 66 1
LIS Tape Verification Listing
Schlumberger Alaska Computing Center
17-NOV-1998 10:44
PAGE:
** SET TYPE - CHAN **
NAME SERV UNIT SERVICE API API API API FILE NO?4B NUM~ SIZE REPR PROCESS
ID ORDER # LOG TYPE CLASS MOD NURIB SAMP ELEM CODE (HEX)
O0 000 O0 0 2 1 1 4 68 0000000000
DEPT FT 118933
NBAC RST CPS 118933 O0 000 O0 0 2 1 1 4 68 0000000000
FBAC RST CPS 118933 O0 000 O0 0 2 1 1 4 68 0000000000
SBNA FIL CU 118933 O0 000 O0 0 2 1 1 4 68 0000000000
SFNA FIL CU 118933 O0 000 O0 0 2 1 1 4 68 0000000000
SBFA FIL CU 118933 O0 000 O0 0 2 1 1 4 68 0000000000
SFFA FIL CU 118933 O0 000 O0 0 2 1 1 4 68 0000000000
TRAT FIL 118933 O0 000 O0 0 2 1 1 4 68 0000000000
IRAT FIL 118933 O0 000 O0 0 2 1 1 4 68 0000000000
CIRNFIL 118933 O0 000 O0 0 2 1 1 4 68 0000000000
CIRF FIL 118933 O0 000 O0 0 2 1 1 4 68 0000000000
BSAL RST PPK 118933 O0 000 O0 0 2 1 1 4 68 0000000000
SIBF RST CU 118933 O0 000 O0 0 2 1 1 4 68 0000000000
TPHI RST PU-S 118933 O0 000 O0 0 2 1 1 4 68 0000000000
SFFC RST CU 118933 O0 000 O0 0 2 1 1 4 68 0000000000
SFNC RST CU 118933 O0 000 O0 0 2 1 1 4 68 0000000000
SIGM RST CU 118933 O0 000 O0 0 2 1 1 4 68 0000000000
DSIG RST CU 118933 O0 000 O0 0 2 1 1 4 68 0000000000
FBEF RST UA 118933 O0 000 O0 0 2 1 1 4 68 0000000000
CRRA RST 118933 O0 000 O0 0 2 1 1 4 68 0000000000
GRCH RST GAPI 118933 O0 000 O0 0 2 1 1 4 68 0000000000
TENS RST LB 118933 O0 000 O0 0 2 1 1 4 68 0000000000
CCL RST V 118933 O0 000 O0 0 2 1 1 4 68 0000000000
** DATA **
DEPT. 9725.000 NBAC.RST 2088.197 FBAC.RST 3663.142 SBNA.FIL
SFNA.FIL 15.978 SBFA.FIL 44.478 SFFA.FIL 15.768 TRAT. FIL
IRAT. FIL 0.471 CIRN. FIL 1.264 CIRF. FIL 3.085 BSAL.RST
SIBF.RST 43.755 TPHI.RST 22.774 SFFC.RST 15.293 SFNC. RST
SIGM. RST 15.274 DSIG.RST 0.271 FBEF. RST 56.682 CRRA.RST
GRCH. RST -999.250 TENS.RST 1141.000 CCL.RST 0.001
DEPT. 9464.000 ArBAC.RST -999.250 FBAC.RST -999.250 SBNA.FIL
SFNA.FIL -999.250 SBFA.FIL -999.250 SFFA.FIL -999.250 TRAT. FIL
IRAT. FIL -999.250 CIRN. FIL -999.250 CIRF. FIL -999.250 BSAL.RST
SIBF. RST -999.250 TPHI.RST -999.250 SFFC.RST -999.250 SFNC.RST
SIGM. RST -999.250 DSIG.RST -999.250 FBEF. RST -999.250 CRRA.RST
GRCH. RST 85.989 TENS.RST -999.250 CCL.RST -999.250
56. 598
O. 864
60. 904
14. 682
2.108
-999.250
-999.250
-999.250
-999.250
-999.250
** END OF DATA **
LIS Tape Verification Listing
Schlumberger Alaska Computing Center
17-NOV-1998 10:44
PAGE:
10
**** FILE TRAILER ****
FILE NAME : EDIT .002
SERVICE : FLIC
VERSION : O01CO1
DATE : 98/11/17
MAX REC SIZE : 1024
FILE TYPE : LO
LAST FILE :
**** FILE HEADER ****
FILE NAME : EDIT .003
SERVICE · FLIC
VERSION : O01CO1
DATE ' 98/11/17
MAX REC SIZE : 1024
FILE TYPE : LO
LAST FILE :
FILE HEADER
FILE NUMBER: 3
EDITED CURVES
Depth shifted and clipped curves for each pass in separate files.
PASS NUMBER: 3
DEPTH INCREMENT: 0.5000
FILE SUM~JU~Y
LDWG TOOL CODE START DEPTH STOP DEPTH
CRCH 9714.0 9464.0
RST 9724.5 9466.0
$
CURVE SHIFT DATA - PASS TO PASS (MEASURED DEPTH)
BASELII~E CURVE FOR SHIFTS
LDWG CURVE CODE: GRCH
PASS NUMBER: 1
BASELINE DEPTH
88888.0
9716.0
9702.5
9693.0
9689.0
9688.0
9670.0
9664.5
9662.0
9659.0
9655.5
.......... EQUIVALENT UNSHIFTED DEPTH ..........
GRCH RST
88888.0 88887.5
9689.0
9668.5
9658.0
9655.0
9715.5
9702.5
9692.0
9687.5
9666.5
9664.0
LIS Tape Verification Listing
Schlumberger Alaska Computing Center
17-NOV-1998 10:44
PAGE:
11
9655.0
9653.0
9649.5
9644.5
9633.0
9632.0
963 O. 5
9629.5
9628.0
9623.5
9622.0
9621.0
9616.5
9615.0
9603.5
9598.0
9595.5
9593.5
9585.5
9585.0
9583.0
9582.0
9573.5
9573.0
9571.5
9566.0
9565.5
9563.5
9563.0
9561.0
9554.0
9553.0
9549.0
9548.0
9545 0
9541 5
9539 5
9537 5
9536 0
9535 5
9533 5
953 O. 5
953 O. 0
9527.0
9524.0
9523.5
9520.5
9517.5
9515.5
9513.5
9511.5
9508.0
9504.5
9502.5
9495.5
9649.5
9633.0
9630.0
9626.5
9623.0
9621.0
9615.0
9603.0
9596.5
9593.0
9583.5
9580.0
9574.0
9571.0
9566.0
9563.0
9560.5
9552.5
9549.0
9545.0
9541.5
9538.5
9535.0
9533.0
9530.5
9523.0
9517.0
9514.5
9511.5
9509.0
9507.0
9501.0
9493.5
9655.5
9653.0
9645.0
9633.0
9630.0
9621.0
9617.5
9615.0
9594.5
9584.0
9581.5
9573.5
9566.5
9563.0
9554.5
9549.0
9538.5
9535.0
9533.5
9531.0
9527.5
9523.5
9519.5
9515.0
9503.0
LIS Tape Verification Listing
Schlumberger Alaska Computing Center
17-NOV-1998 10:44
PAGE:
12
9494.5
9489.5
9488.5
9483.0
100.0
9487.5
98.0
9492.5
9487.5
9483.0
100.0
RE~RKS: THIS FILE CONTAINS CASED HOLE RST BASE PASS #3. THE
DEPTH SHIFTS SHOWN ABOVEREFLECT CORRELATIONS BETWEEN
GRCH BASE PASS #3 AND GRCH BASE PASS #1, ALSO SIGMA
BASE PASS #3 AND SIGMA BASE PASS #1, CARRYING ALL
RST CURVES WITH THE SIGMA SHIFTS.
$
LIS FORMAT DATA
** DATA FORMAT SPECIFICATION RECORD **
* * SET TYPE - 64EB **
TYPE REPR CODE VALUE
1 66 0
2 66 0
3 73 92
4 66 1
5 66
6 73
7 65
8 68 0.5
9 65 FT
11 66 11
12 68
13 66 0
14 65 FT
15 66 68
16 66 1
0 66 1
** SET TYPE - CHAN**
NAME SERVUNIT SERVICE API API API API FILE NUMB NUM~ SIZE REPR PROCESS
ID ORDER # LOG TYPE CLASS MOD NUM~ SAMP ELE~ CODE (HEX)
DEPT FT 118933 O0 000 O0 0 3 1 1 4 68 0000000000
NBAC RST CPS 118933 O0 000 O0 0 3 1 1 4 68 0000000000
FBAC RST CPS 118933 O0 000 O0 0 3 1 1 4 68 0000000000
SBNA FIL CU 118933 O0 000 O0 0 3 1 1 4 68 0000000000
SFNA FIL CU 118933 O0 000 O0 0 3 1 1 4 68 0000000000
SBFA FIL CU 118933 O0 000 O0 0 3 1 1 4 68 0000000000
SFFA FIL CU 118933 O0 000 O0 0 3 1 1 4 68 0000000000
LIS Tape Verification Listing
Schlumberger Alaska Computing Center
17-NOV-1998 10:44
PAGE:
13
NAME SERV UNIT SERVICE API API API API FILE NUMB NUM~ SIZE REPR PROCESS
ID ORDER # LOG TYPE CLASS MOD NUM~ SAMP ELEM CODE (HEX)
TRAT FIL 118933 O0 000 O0 0 3 1 1 4 68 0000000000
IRAT FIL 118933 O0 000 O0 0 3 1 1 4 68 0000000000
CIRNFIL 118933 O0 000 O0 0 3 1 1 4 68 0000000000
CIRF FIL 118933 O0 000 O0 0 3 1 1 4 68 0000000000
BSALRST PPK 118933 O0 000 O0 0 3 1 1 4 68 0000000000
SIBF RST CU 118933 O0 000 O0 0 3 1 1 4 68 0000000000
TPHI RST PU-S 118933 O0 000 O0 0 3 1 1 4 68 0000000000
SFFC RST CU 118933 O0 000 O0 0 3 1 1 4 68 0000000000
SFNC RST CU 118933 O0 000 O0 0 3 1 1 4 68 0000000000
SIGM RST CU 118933 O0 000 O0 0 3 1 1 4 68 0000000000
DSIG RST CU 118933 O0 000 O0 0 3 1 1 4 68 0000000000
FBEF RST UA 118933 O0 000 O0 0 3 1 1 4 68 0000000000
CRRARST 118933 O0 000 O0 0 3 1 1 4 68 0000000000
GRCH RST GAPI 118933 O0 000 O0 0 3 1 1 4 68 0000000000
TENS RST LB 118933 O0 000 O0 0 3 1 1 4 68 0000000000
CCL RST V 118933 O0 000 O0 0 3 1 1 4 68 0000000000
** DATA **
DEPT. 9724.500 NBAC.RST 2236.816 FBAC.RST 3562.049 SBNA.FIL
SFNA.FIL 16.160 SBFA.FIL 39.427 SFFA.FIL 14.960 TRAT. FIL
IRAT. FIL 0.473 CIRN. FIL 1.263 CIRF. FIL 3.158 BSAL.RST
SIBF. RST 45.560 TPHI.RST 21.644 SFFC.RST 14.521 SFNC.RST
SIGM. RST 14.505 DSIG.RST 0.571 FBEF. RST 58.103 CRRA.RST
GRCH. RST -999.250 TENS.RST 1191.000 CCL.RST 0.020
58. 822
O. 843
65. 796
14. 861
2. 156
** END OF DATA **
**** FILE TRAILER ****
FILE NAME : EDIT .003
SERVICE · FLIC
VERSION . O01CO1
DATE · 98/11/17
MAX REC SIZE : 1024
FILE TYPE : LO
LAST FILE :
LIS Tape Verification Listing
Schlumberger Alaska Computing Center
17-NOV-1998 10:44
PAGE:
14
**** FILE HEADER ****
FILE NAM~ : EDIT .004
SERVICE : FLIC
VERSION : O01CO1
DATE : 98/11/17
MAX REC SIZE : 1024
FILE TYPE : LO
LAST FILE :
FILE HEADER
FILE NUMBER: 4
AVERAGED CURVES
Pulsed Neutron: Unaveraged edited Pass 1 Gamma Ray and backround counts; arithmetic average
of edited static baseline passes for all other curves.
DEPTH INCREMENT O. 5000
PASSES INCLUDED IN AVERAGE
LDWG TOOL CODE PASS NUPI~ERS
1, 2, 3,
RST
$
REMARKS:
THIS FILE CONTAINS THE ARITftM~TIC AVERAGE OF BASE
PASSES 1,2, & 3. THE DATA WAS CLIPPED ANDDEPTH
SHIFTED BEFORE THE AVERAGE WAS CALCULATED.
$
LIS FORMAT DATA
** DATA FORMAT SPECIFICATION RECORD **
** SET TYPE - 64EB **
TYPE REPR CODE VALUE
1 66 0
2 66 0
3 73 84
4 66 1
5 66
6 73
7 65
8 68 0.5
9 65 FT
11 66 12
12 68
13 66 0
14 65 FT
15 66 68
16 66 1
LIS Tape Verification Listing
Schlumberger Alaska Computing Center
17-NOV-1998 10:44
PAGE:
15
TYPE REPR CODE VALUE
0 66 1
** SET TYPE - CHAN **
NAME SERVUNIT SERVICE API API API API FILE NUMB NUMB SIZE REPR PROCESS
ID ORDER # LOG TYPE CLASS MOD NUM~ SAMP ELE~ CODE (HEX)
DEPT FT 118933 O0 000 O0 0 4 1 1 4 68 0000000000
NBAC RST CPS 118933 O0 000 00 0 4 1 1 4 68 0000000000
FBAC RST CPS 118933 O0 000 O0 0 4 1 1 4 68 0000000000
SBNA RSAV CU 118933 O0 000 O0 0 4 1 1 4 68 0000000000
SFNA RSAV CU 118933 O0 000 O0 0 4 1 1 4 68 0000000000
SBFA RSAV CU 118933 O0 000 O0 0 4 1 1 4 68 0000000000
SFFA RSAV CU 118933 O0 000 O0 0 4 1 1 4 68 0000000000
TRAT RSAV 118933 O0 000 O0 0 4 1 1 4 68 0000000000
IRAT RSAV 118933 O0 000 O0 0 4 1 1 4 68 0000000000
CIRNRSAV 118933 O0 000 O0 0 4 1 1 4 68 0000000000
CIRF RSAV 118933 O0 000 O0 0 4 1 1 4 68 0000000000
BSALRSAV PPK 118933 O0 000 O0 0 4 1 1 4 68 0000000000
SIBF RSAV CU 118933 O0 000 O0 0 4 1 1 4 68 0000000000
TPHI RSAV PU-S 118933 O0 000 O0 0 4 1 1 4 68 0000000000
SFFC RSAV CU 118933 O0 000 O0 0 4 1 1 4 68 0000000000
SFNC RSAV CU 118933 O0 000 O0 0 4 1 1 4 68 0000000000
SIGM RSAV CU 118933 O0 000 O0 0 4 1 1 4 68 0000000000
DSIG RSAV CU 118933 O0 000 O0 0 4 1 1 4 68 0000000000
FBEF RSAV UA 118933 O0 000 O0 0 4 1 1 4 68 0000000000
CRRARSAV 118933 O0 000 O0 0 4 1 1 4 68 0000000000
GRCH RST GAPI 118933 O0 000 O0 0 4 1 1 4 68 0000000000
** DATA **
DEPT. 9739.000 NBAC.RST 1902.139 FBAC.RST
SFNA.RSAV -999.250 SBFA.RSAV -999.250 SFFA.RSAV
IRAT.RSAV -999.250 CIRN. RSAV -999.250 CIRF. RSAV
SIBF.RSAV -999.250 TPHI.RSAV -999.250 SFFC.RSAV
SIGM. RSAV -999.250 DSIG.RSAV -999.250 FBEF.RSAV
GRCH.RST -999.250
3424. 956 SBNA. RSAV
-999. 250 TRAT. RSAV
-999. 250 BSAL. RSAV
-999. 250 SFNC. RSAV
-999. 250 CRRA. RSAV
-999.250
-999.250
-999.250
-999.250
-999.250
DEPT. 9473.000 NBAC.RST -999.250 FBAC.RST -999.250 SBNA.RSAV -999.250
SFNA.RSAV -999.250 SBFA.RSAV -999.250 SFFA.RSAV -999.250 TRAT. RSAV -999.250
IRAT.RSAV -999.250 CIRN. RSAV -999.250 CIRF.RSAV -999.250 BSAL.RSAV -999.250
SIBF.RSAV -999.250 TPHI.RSAV -999.250 SFFC.RSAV -999.250 SFNC.RSAV -999.250
SIGM. RSAV -999.250 DSIG.RSAV -999.250 FBEF. RSAV -999.250 CRRA.RSAV -999.250
GRCH.RST 86.536
** END OF DATA **
LIS Tape Verification Listing
Schlumberger Alaska Computing Center
17-NOV-1998 10:44
PAGE:
16
**** FILE TRAILER ****
FILE NAi~E : EDIT .004
SERVICE : FLIC
VERSION : O01CO1
DATE : 98/11/17
MAX REC SIZE : 1024
FILE TYPE : LO
LAST FILE :
**** FILE HEADER ****
FILE NAME : EDIT .005
SERVICE · FLIC
VERSION : O01CO1
DATE : 98/11/17
MAX REC SIZE : 1024
FILE TYPE : LO
LAST FILE :
FILE HEADER
FILE NUMBER 5
RAW CURVES
Curves and log header data for each pass in separate files; raw background pass in last file
PASS NUMBER: 1
DEPTH INCREMENT: 0.5000
FILE SUM~D%RY
VENDOR TOOL CODE START DEPTH
RST 9767.5
$
LOG HEADER DATA
DATE LOGGED:
SOFTWARE VERSION:
TIME LOGGER ON BOTTOM:
TD DRILLER (FT) :
TD LOGGER (FT) :
TOP LOG INTERVAL (FT) :
BOTTOM LOG INTERVAL (FT) :
LOGGING SPEED (FPHR):
DEPTH CONTROL USED (YES/NO):
STOP DEPTH
9424.5
TOOL STRING (TOP TO BOTTOM)
VENDOR TOOL CODE TOOL TYPE
GR GAN~4A RAY
RST RESERVOIR SATURATION
$
BOREHOLE AND CASING DATA
OPEN HOLE BIT SIZE (IN):
26-AUG-98
8Cl -205
1944 26-AUG-98
9845.0
9466.0
9741.0
TOOL NUMBER
CGRS-A
RST-A
6.000
LIS Tape Verification Listing
Schlumberger Alaska Computing Center
17-NOV-1998 10:44
PAGE:
17
DRILLERS CASING DEPTH (FT) :
LOGGERS CASING DEPTH (FT) :
BOREHOLE CONDITIONS
FLUID TYPE:
FLUID DENSITY (LB/G):
SURFACE TEMPERATURE (DEGF) :
BOTTOM HOLE TEMPERATURE (DEGF):
FLUID SALINITY (PPM) :
FLUID LEVEL (FT) :
FLUID RATE AT WELLHEAD (BPM) :
WATER CUTS (PCT) :
GAS~OIL RATIO:
CHOKE (DEG) :
9959.0
PRODUCED FLUIDS
218.0
NEUTRON TOOL
TOOL TYPE (EPITHERMAL OR THERMAL)
MATRIX:
MATRIX DENSITY:
HOLE CORRECTION (IN):
THERMAL
SANDSTONE
2.65
BLUELINE COUNT RATE NORMALIZATION IN OIL ZONE
TOP NORMALIZING WINDOW (FT) :
BASE NORMALIZING WINDOW (FT) :
BLUELINE COUNT RATE SCALES SET BY FIELD ENGINEER
FAR COUNT RATE LOW SCALE (CPS): 0
FAR COUNT RATE HIGH SCALE (CPS) .. 6
NEAR COUNT RATE LOW SCALE (CPS): 0
NEAR COUNT RATE HIGH SCALE (CPS): 3
TOOL STANDOFF (IN):
REMARKS: DEPTH CORRELATED TO USIT-CNL-GR OF 8-JUL-1998
USED RST WITH CPLC
WELL SHUT IN TO RUN IN HOLE AND LOGGED AFTER 1 HR
STAB TIME.
WELL PUT IN TEST DURING JOB FOR 8 HOURS.
LOGGED THREE PASSES, 2 AT 1800 FPH AND ONE AT 600 FPH
ALL PASSES MADE WITH WELL FLOWING
MOST RECENT TEST PRIOR TO LOGGING 08-21-98
GFR 1.88, NOR 1.74 ~BOPD, NWR .14 MBBWPD, FGR 6.29 ~CFD
GLR=O, CK 94, 190 PSIG WHP, 112 DEGF WHT
WHILE LOGGING WHP 240 PSI, 103 DEGF
THIS FILE CONTAINS THE RAW DATA FOR BASE PASS #1.
$
LIS FORMAT DATA
LIS Tape Verification Listing
Schlumberger Alaska Computing Center
17-NOV-1998 10:44
PAGE:
18
** DATA FORMAT SPECIFICATION RECORD **
** SET TYPE - 64EB **
TYPE REPR CODE VALUE
1 66 0
2 66 0
3 73 368
4 66 1
5 66
6 73
7 65
8 68 O. 5
9 65 FT
11 66 2
12 68
13 66 0
14 65 FT
15 66 68
16 66 1
0 66 1
* * SET TYPE - CHAN * *
NAME SERV UNIT SERVICE API API API API FILE NIk/iB NI]M~ SIZE REPR PROCESS
ID ORDER # LOG TYPE CLASS MOD NUM~ SAMP ELEM CODE (HEX)
DEPT FT 118933 O0 000 O0 0 5 1 1 4 68 0000000000
CS PS1 F/HR 118933 O0 000 O0 0 5 1 1 4 68 0000000000
TENS PS1 LB 118933 O0 000 O0 0 5 1 1 4 68 0000000000
NPHV PS1 V 118933 O0 000 O0 0 5 1 1 4 68 0000000000
NPDE PS1 V 118933 O0 000 O0 0 5 1 1 4 68 0000000000
NSCE PS1 V 118933 O0 000 O0 0 5 1 1 4 68 0000000000
CRRA PS1 118933 O0 000 O0 0 5 1 1 4 68 0000000000
NSCR PS1 118933 O0 000 O0 0 5 1 1 4 68 0000000000
AQTM PS1 S 118933 O0 000 O0 0 5 1 1 4 68 0000000000
CHV PS1 V 118933 O0 000 O0 0 5 1 1 4 68 0000000000
CPSV PS1 V 118933 O0 000 O0 0 5 1 1 4 68 0000000000
CP2V PS1 V 118933 O0 000 O0 0 5 1 1 4 68 0000000000
CM2V PS1 V 118933 O0 000 O0 0 5 1 1 4 68 0000000000
RCFR PS1 118933 O0 000 O0 0 5 1 1 4 68 0000000000
RCLC PS1 118933 O0 000 O0 0 5 1 1 4 68 0000000000
RCRC PS1 118933 O0 000 O0 0 5 1 1 4 68 0000000000
RCAKPSl 118933 O0 000 O0 0 5 1 1 4 68 0000000000
RTDF PS1 118933 O0 000 O0 0 5 1 1 4 68 0000000000
FPHVPS1 V 118933 O0 000 O0 0 $ 1 1 4 68 0000000000
FPDE PSl V 118933 O0 000 O0 0 5 1 1 4 68 0000000000
FSCE PS1 V 118933 O0 000 O0 0 5 1 1 4 68 0000000000
FSCR PS1 118933 O0 000 O0 0 5 1 1 4 68 0000000000
AQTF PS1 S 118933 O0 000 O0 0 5 1 1 4 68 0000000000
SF6P PS1 PSIG 118933 O0 000 O0 0 5 1 1 4 68 0000000000
HVPV PS1 V 118933 O0 000 O0 0 5 1 1 4 68 0000000000
BMCU PS1 UA 118933 O0 000 O0 0 5 1 1 4 68 0000000000
LIS Tape Verification Listing
Schlumberger Alaska Computing Center
17-NOV-1998 10:44
PAGE:
19
NAME SERVUNIT SERVICE API API API API FILE NUA~ NUM~ SIZE REPR PROCESS
ID ORDER # LOG TYPE CLASS MOD NUM~ SAMP ELE~ CODE (HEX)
GDCU PS1 MA 118933 O0 000 O0 0 5 1 1 4 68 0000000000
EXCU PS1 UA 118933 O0 000 O0 0 5 1 1 4 68 0000000000
NBEF PS1 UA 118933 O0 000 O0 0 $ 1 1 4 68 0000000000
FBEF PS1 UA 118933 O0 000 O0 0 5 1 1 4 68 0000000000
NPGF PS1 118933 O0 000 O0 0 5 1 1 4 68 0000000000
FPGF PS1 118933 O0 000 O0 0 5 1 1 4 68 0000000000
BSTR PS1 118933 O0 000 O0 0 $ 1 1 4 68 0000000000
BSPR PS1 118933 O0 000 O0 0 $ 1 1 4 68 0000000000
MARC PS1 118933 O0 000 O0 0 5 1 1 4 68 0000000000
XHV PS1 V 118933 O0 000 O0 0 $ 1 1 4 68 0000000000
XPSV PS1 V 118933 O0 000 O0 0 $ 1 1 4 68 0000000000
XP2V PS1 V 118933 O0 000 O0 0 5 1 1 4 68 0000000000
X~I2V PS1 V 118933 O0 000 O0 0 $ 1 1 4 68 0000000000
RXFR PS1 118933 O0 000 O0 0 $ 1 1 4 68 0000000000
RXLC PS1 118933 O0 000 O0 0 5 1 1 4 68 0000000000
RXRC PS1 118933 O0 000 O0 0 5 1 1 4 68 0000000000
RXAK PS1 118933 O0 000 O0 0 5 1 1 4 68 0000000000
SHCU PS1 MA 118933 O0 000 O0 0 5 1 1 4 68 0000000000
BSAL PS1 PPK 118933 O0 000 O0 0 $ 1 1 4 68 0000000000
BSAL SIG PPK 118933 O0 000 O0 0 5 1 1 4 68 0000000000
CIRNPS1 118933 O0 000 O0 0 5 1 1 4 68 0000000000
CIRF PS1 118933 O0 000 O0 0 5 1 1 4 68 0000000000
CIRNFIL 118933 O0 000 O0 0 $ 1 1 4 68 0000000000
CIRF FIL 118933 O0 000 O0 0 5 1 1 4 68 0000000000
DSIG PS1 CU 118933 O0 000 O0 0 5 1 1 4 68 0000000000
FBAC PS1 CPS 118933 O0 000 O0 0 $ 1 1 4 68 0000000000
IRAT PS1 118933 O0 000 O0 0 5 1 1 4 68 0000000000
IRAT FIL 118933 O0 000 O0 0 5 1 1 4 68 0000000000
NBAC PS1 CPS 118933 O0 000 O0 0 $ 1 1 4 68 0000000000
SFNA PS1 CU 118933 O0 000 O0 0 5 1 1 4 68 0000000000
SFFA PS1 CU 118933 O0 000 O0 0 $ 1 1 4 68 0000000000
SBNA PS1 CU 118933 O0 000 O0 0 5 i 1 4 68 0000000000
SBFA PS1 CU 118933 O0 000 O0 0 5 1 1 4 68 0000000000
SFNA SIG CU 118933 O0 000 O0 0 5 1 1 4 68 0000000000
SFFA SIG CU 118933 O0 000 O0 0 5 1 1 4 68 0000000000
SBNA SIG CU 118933 O0 000 O0 0 5 1 1 4 68 0000000000
SBFA SIG CU 118933 O0 000 O0 0 5 1 1 4 68 0000000000
SFNA FIL CU 118933 O0 000 O0 0 $ 1 1 4 68 0000000000
SFFA FIL CU 118933 O0 000 O0 0 5 1 1 4 68 0000000000
SBNA FIL CU 118933 O0 000 O0 0 5 1 1 4 68 0000000000
SBFA FIL CU 118933 O0 000 O0 0 $ 1 1 4 68 0000000000
SIBF PSi CU 118933 O0 000 O0 0 5 1 1 4 68 0000000000
SFNC PS1 CU 118933 O0 000 O0 0 5 1 1 4 68 0000000000
SFFC PS1 CU 118933 O0 000 O0 0 5 1 1 4 68 0000000000
SIGM PS1 CU 118933 O0 000 O0 0 $ 1 1 4 68 0000000000
SIBF SIG CU 118933 O0 000 O0 0 5 1 1 4 68 0000000000
SIGM SIG CU 118933 O0 000 O0 0 $ 1 1 4 68 0000000000
TRAT PSl 118933 O0 000 O0 0 5 1 1 4 68 0000000000
TRAT SIG 118933 O0 000 O0 0 5 1 1 4 68 0000000000
TRAT FIL 118933 O0 000 O0 0 5 1 1 4 68 0000000000
GR PS1 GAPI 118933 O0 000 O0 0 5 1 1 4 68 0000000000
LIS Tape Verification Listing
Schlumberger Alaska Computing Center
17-NOV-1998 10:44
PACE:
20
NAME SERV UNIT SERVICE API API API API FILE NUM~ ~ SIZE REPR PROCESS
ID ORDER # LOG TYPE CLASS MOD NUlV~ SAMP ELEM CODE (HEX)
RDIX PS1 118933
CRNI PS1 KHZ 118933
CRFI PS1 IG~Z 118933
CTM PS1 DEGC 118933
XTM PSl DEGC 118933
TAV PS1 KV 118933
FICU PS1 AMP 118933
CACU PS1 AMP 118933
BUST PS1 118933
BUSP PS1 118933
RSXS PS1 118933
TPHI PS1 PU 118933
TPHI SIG PU 118933
CCLC PS1 V 118933
RSCS PS1 118933
O0 000 O0 0 5 1 1 4 68 0000000000
O0 000 O0 0 5 1 1 4 68 0000000000
O0 000 O0 0 5 1 1 4 68 0000000000
O0 000 O0 0 5 1 1 4 68 0000000000
O0 000 O0 0 5 1 1 4 68 0000000000
O0 000 O0 0 5 1 1 4 68 0000000000
O0 000 O0 0 5 1 1 4 68 0000000000
O0 000 O0 0 5 1 1 4 68 0000000000
O0 000 O0 0 5 1 1 4 68 0000000000
O0 000 O0 0 5 1 1 4 68 0000000000
O0 000 O0 0 5 1 1 4 68 0000000000
O0 000 O0 0 5 1 1 4 68 0000000000
O0 000 O0 0 5 1 1 4 68 0000000000
O0 000 O0 0 5 1 1 4 68 0000000000
O0 000 O0 0 5 1 1 4 68 0000000000
** DATA **
DEPT. 9750.000 CS. PS1
NPDE. PS1 1468.354 NSCE. PS1
AQTM. PS1 1.102 CHV. PS1
CM2V, PS1 -12.113 RCFR.PSl
RCAK. PS1 0.000 RTDF. PS1
FSCE. PS1 1.884 FSCR.PS1
HVPV. PS1 163.379 BMCU. PS1
NBEF. PS1 24.638 FBEF. PS1
BSTR.PS1 51.124 BSPR.PS1
XPSV. PS1 5.075 XP2V. PS1
RXLC. PS1 0.000 RXRC.PS1
BSAL.PS1 66.159 BSAL.SIG
CIRN. FIL 1.035 CIRF. FIL
IRAT. PS1 0.468 IRAT. FIL
SFFA.PS1 15.575 SBNA.PS1
SFFA.SIG 0.208 SBNA.SIG
SFFA.FIL 15.496 SBNA.FIL
SFNC. PS1 14.866 SFFC. PS1
SIGM. SIG 0.180 TRAT. PS1
GR.PS1 33.396 RDIX. PSl
CTM. PS1 101.563 XTM. PS1
CACU. PS1 2.491 BUST. PSi
TPHI.PS1 13.120 TPHI.SIG
1836.169
2.237
202. 914
O. 000
0.000
-0. 014
29. 629
52. 662
1.122
12.171
O. 000
6.136
3. 177
0 470
64 378
3 271
64 126
14 758
0 697
6664. 000
101. 628
3. 000
O. 356
DEPT. 9450.000 CS.PS1 1860.663
NPDE. PS1 1470.452 NSCE. PS1 2.294
AQTM. PS1 1.102 CHV. PS1 203.883
CM2V. PS1 -12.182 RCFR.PS1 0.000
RCAK. PS1 0.000 RTDF. PS1 0.000
FSCE. PS1 2.017 FSCR.PS1 0.052
HVPV. PS1 163.295 BMCU. PS1 26.702
TENS.PSI 1160.000 NPHV. PS1
CRRA.PS1 2.137 NSCR.PS1
CPSV. PS1 5.069 CP2V. PS1
RCLC.PS1 0.000 RCRC. PS1
FPHV. PS1 1540.529 FPDE. PS1
AQTF. PS1 1.322 SF6P. PS1
GDCU. PS1 59.968 EXCU. PS1
NPGF.PS1 1.005 FPGF. PS1
MARC.PSi 0.000 XHV. PS1
J~42V. PS1 -12.351 R~FR.PS1
RXAK.PS1 0.000 SHCU. PS1
CIRN. PS1 1.042 CIRF. PS1
DSIG.PS1 0.036 FBAC.PS1
NBAC. PS1 3758.593 SFNA.PS1
SBFA.PS1 36.640 SFNA. SIG
SBFA.SIG 3.494 SFNA.FIL
SBFA.FIL 42.982 SIBF. PS1
SIGM. PS1 14.868 SIBF. SIG
TRAT. SIG O. O10 TRAT. FIL
CRNI. PS1 455. O18 CRFI. PS1
TAV. PS1 94. 984 FICU. PSi
BUSP. PS1 3 . 000 RSXS. PS1
CCLC. PS1 - O. 001 RSCS. PS1
TENS.PSi 1122.000 NPHV. PS1
CRRA.PS1 1.521 NSCR.PS1
CPSV. PS1 5.050 CP2V. PS1
RCLC. PS1 0.000 RCRC.PS1
FPHV. PS1 1544.191 FPDE. PS1
AQTF. PS1 1.102 SF6P. PS1
GDCU. PS1 60.129 EXCU. PS1
1500.245
-0.324
12.019
0.000
1502.648
141.954
5.339
0.993
200.644
0.000
41.604
3.140
4136.637
16.994
0.375
17.071
45.694
2.271
0.702
212.883
2.240
8878.000
8463.000
1500.245
-0.086
12.070
0.000
1508.065
143.183
6.256
LIS Tape Verification Listing
Schlumberger Alaska Computing Center
17-NOV-1998 10:44
PAGE
21
NBEF. PS1 21.494 FBEF. PSl
BSTR.PS1 116.560 BSPR.PS1
XPSV. PS1 5.069 XP2V. PS1
RXLC. PS1 0.000 RXRC. PSl
BSAL.PS1 -3.690 BSAL.SIG
CIRN. FIL 0.490 CIRF. FIL
IRAT. PS1 0.667 IRAT. FIL
SFFA.PS1 30.419 SBNA.PS1
SFFA.SIG 0.584 SBNA. SIG
SFFA.FIL 30.604 SBNA.FIL
SFNC. PS1 29.658 SFFC. PS1
SIGM. SIG 0.591 TRAT. PS1
GR.PS1 49.673 RDIX. PS1
CTM. PS1 94.482 XTM. PS1
CACU. PS1 2.476 BUST. PSl
TPHI.PS1 11.010 TPHI.SIG
32.696 NPGF.PS1
1.112 MARC. PSi
12.175 XM2V. PS1
0.000 RXAK.PS1
4.718 CIRN. PS1
0.981 DSIG.PS1
0.665 NBAC.PS1
57.251 SBFA.PS1
5.850 SBFA.SIG
56.986 SBFA.FIL
29.859 SIGM. PS1
0.760 TRAT. SIG
15422.000 CRNI.PS1
95.285 TAV. PS1
3.000 BUSP.PS1
0.634 CCLC. PS1
0.989 FPGF. PS1
0.000 Xh-V. PS1
-12.362 RXFR.PS1
0.000 SHCU. PS1
0.541 CIRF. PS1
-0.714 FBAC. PS1
2182.531 SFNA.PS1
46.997 SFNA. SIG
3.454 SFNA.FIL
46.906 SIBF. PS1
30.299 SIBF. SIG
0.017 TRAT. FIL
447.069 CRFI.PS1
95.042 FICU. PS1
3.000 RSXS. PS1
-0.100 RSCS. PS1
1.000
200.491
0.000
44.529
0.981
3653.654
30.687
1.130
32.792
20.903
1.601
0.752
293.901
2.204
8878.000
8463.000
** END OF DATA **
**** FILE TRAILER ****
FILE NAME : EDIT .005
SERVICE : FLIC
VERSION : O01CO1
DATE : 98/11/17
MAX REC SIZE : 1024
FILE TYPE : LO
LAST FILE :
**** FILE HEADER ****
FILE NAME : EDIT .006
SERVICE : FLIC
VERSION · O01CO1
DATE : 98/11/17
MAX REC SIZE : 1024
FILE TYPE : LO
LAST FILE :
FILE HEADER
FILE NUMBER 6
RAW CURVES
Curves and log header data for each pass in separate files; raw background pass in last file
PASS NUMBER: 2
DEPTH INCREMENT: 0.5000
FILE SUMMARY
VENDOR TOOL CODE START DEPTH STOP DEPTH
RST 9754.0 9428.5
LIS Tape Verification Listing
Schlumberger Alaska Computing Center
17-NOV-1998 10:44
PAGE:
22
$
LOG HEADER DATA
DATE LOGGED:
SOFTWARE VERSION:
TIME LOGGER ON BOTTOM:
TD DRILLER (FT) :
TD LOGGER (FT) :
TOP LOG INTERVAL (FT) :
BOTTOM LOG INTERVAL (FT) :
LOGGING SPEED (FPHR):
DEPTH CONTROL USED (YES/NO):
26-AUG-98
8Cl -205
1944 26-AUG-98
9845.0
9466.0
9741.0
TOOL STRING (TOP TO BOTTOM)
VENDOR TOOL CODE TOOL TYPE
GR GAFk4A RAY
RST RESERVOIR SATURATION
$
TOOL NUMBER
CGRS-A
RST-A
BOREHOLE AND CASING DATA
OPEN HOLE BIT SIZE (IN):
DRILLERS CASING DEPTH (FT) :
LOGGERS CASING DEPTH (FT) :
6. 000
9959.0
BOREHOLE CONDITIONS
FLUID TYPE:
FLUID DENSITY (LB/G):
SURFACE TEMPERATURE (DEGF) :
BOTTOM HOLE TEMPERATURE (DEGF) :
FLUID SALINITY (PPM) :
FLUID LEVEL (FT) :
FLUID RATE AT WELLHEAD (BPM) :
WATER CUTS (PCT) :
GAS~OIL RATIO:
CHOKE (DEG) :
PRODUCED FLUIDS
218.0
NEUTRON TOOL
TOOL TYPE (EPITHERMAL OR THERMAL)
MATRIX:
MATRIX DENSITY:
HOLE CORRECTION (IN):
THERMAL
SANDSTONE
2.65
BLUELINE COUNT RATE NORMALIZATION IN OIL ZONE
TOP NORMALIZING WINDOW (FT):
BASE NORMALIZING WINDOW (FT) :
BLUELINE COUNT RATE SCALES SET BY FIELD ENGINEER
FAR COUNT RATE LOW SCALE (CPS): 0
FAR COUNT RATE HIGH SCALE (CPS): 6
NEAR COUNT RATE LOW SCALE (CPS): 0
NEAR COUNT RATE HIGH SCALE (CPS): 3
TOOL STANDOFF (IN):
REMARKS: DEPTH CORRELATED TO USIT-CNL-GR OF 8-JUL-1998
LIS Tape Verification Listing
Schlumberger Alaska Computing Center
17-NOV-1998 10:44
PAGE:
23
USED RST WITH CPLC
WELL SHUT IN TO RUN IN HOLE AND LOGGED AFTER 1 HR
STAB TIME.
WELL PUT IN TEST DURING JOB FOR 8 HOURS.
LOGGED THREE PASSES, 2 AT 1800 FPH AND ONE AT 600 FPH
ALL PASSES MADE WITH WELL FLOWING
MOST RECENT TEST PRIOR TO LOGGING 08-21-98
GFR 1.88, NOR 1.74 MBOPD, NWR .14 MBBWPD, FGR 6.29 Fff~CFD
GLR=O, CK 94, 190 PSIG WHP, 112 DEGF WHT
WHILE LOGGING WHP 240 PSI, 103 DEGF
THIS FILE CONTAINS THE RAW DATA FOR BASE PASS #2.
$
LIS FORMAT DATA
** DATA FORMAT SPECIFICATION RECORD **
** SET TYPE - 64EB **
TYPE REPR CODE VALUE
1 66 0
2 66 0
3 73 368
4 66 1
5 66
6 73
? 65
8 68 0.5
9 65 FT
11 66 2
12 68
13 66 0
14 65 FT
15 66 68
16 66 1
0 66 1
** SET TYPE - CHAN **
NAME SERV UNIT SERVICE API API API API FILE NUMB NUMB SIZE REPR PROCESS
ID ORDER # LOG TYPE CLASS MOD ~ SAMP ELEM CODE (HEX)
DEPT FT 118933 O0 000 O0 0 6 1 1 4 68 0000000000
CS PS2 F/HR 118933 O0 000 O0 0 6 1 1 4 68 0000000000
TENS PS2 LB 118933 O0 000 O0 0 6 1 1 4 68 0000000000
NPHV PS2 V 118933 O0 000 O0 0 6 1 1 4 68 0000000000
NPDE PS2 V 118933 O0 000 O0 0 6 1 1 4 68 0000000000
NSCE PS2 V 118933 O0 000 O0 0 6 1 1 4 68 0000000000
CRRA PS2 118933 O0 000 O0 0 6 1 1 4 68 0000000000
NSCR PS2 118933 O0 000 O0 0 6 1 1 4 68 0000000000
LIS Tape Verification Listing
Schlumberger Alaska Computing Center
17-NOV-1998 10:44
PAGE:
24
NAME SERV UNIT SERVICE API API API API FILE NUM~ NUF~ SIZE REPR PROCESS
ID ORDER # LOG TYPE CLASS MOD NUM~ SAMP ELEM CODE (HEX)
AQTMPS2 S 118933 O0 000 O0 0 6 1 1 4 68 0000000000
CHV PS2 V 118933 O0 000 O0 0 6 1 1 4 68 0000000000
CPSV PS2 V 118933 O0 000 O0 0 6 1 1 4 68 0000000000
CP2V PS2 V 118933 O0 000 O0 0 6 1 1 4 68 0000000000
CM2V PS2 V 118933 O0 000 O0 0 6 1 1 4 68 0000000000
RCFR PS2 118933 O0 000 O0 0 6 1 1 4 68 0000000000
RCLC PS2 118933 O0 000 O0 0 6 1 1 4 68 0000000000
RCRC PS2 118933 O0 000 O0 0 6 1 1 4 68 0000000000
RCAKPS2 118933 O0 000 O0 0 6 1 1 4 68 0000000000
RTDF PS2 118933 O0 000 O0 0 6 1 1 4 68 0000000000
FPHVPS2 V 118933 O0 000 O0 0 6 I 1 4 68 0000000000
FPDE PS2 V 118933 O0 000 O0 0 6 1 1 4 68 0000000000
FSCE PS2 V 118933 O0 000 O0 0 6 1 1 4 68 0000000000
FSCR PS2 118933 O0 000 O0 0 6 1 1 4 68 0000000000
AQTF PS2 S 118933 O0 000 O0 0 6 1 1 4 68 0000000000
SF6P PS2 PSIG 118933 O0 000 O0 0 6 1 1 4 68 0000000000
HVPV PS2 V 118933 O0 000 O0 0 6 1 1 4 68 0000000000
BMCU PS2 UA 118933 O0 000 O0 0 6 1 1 4 68 0000000000
GDCU PS2 MA 118933 O0 000 O0 0 6 1 1 4 68 0000000000
EXCU PS2 UA 118933 O0 000 O0 0 6 1 1 4 68 0000000000
NBEF PS2 UA 118933 O0 000 O0 0 6 1 1 4 68 0000000000
FBEF PS2 UA 118933 O0 000 O0 0 6 1 1 4 68 0000000000
NPGF PS2 118933 O0 000 O0 0 6 1 1 4 68 0000000000
FPGF PS2 118933 O0 000 O0 0 6 1 1 4 68 0000000000
BSTR PS2 118933 O0 000 O0 0 6 1 1 4 68 0000000000
BSPR PS2 118933 O0 000 O0 0 6 1 1 4 68 0000000000
MARC PS2 118933 O0 000 O0 0 6 1 1 4 68 0000000000
XHV PS2 V 118933 O0 000 O0 0 6 1 1 4 68 0000000000
XPSV PS2 V 118933 O0 000 O0 0 6 1 1 4 68 0000000000
XP2V PS2 V 118933 O0 000 O0 0 6 1 1 4 68 0000000000
X~2V PS2 V 118933 O0 000 O0 0 6 1 1 4 68 0000000000
RXFR PS2 118933 O0 000 O0 0 6 1 1 4 68 0000000000
RXLC PS2 118933 O0 000 O0 0 6 1 1 4 68 0000000000
RXRC PS2 118933 O0 000 O0 0 6 1 1 4 68 0000000000
R3fAKPS2 118933 O0 000 O0 0 6 1 1 4 68 0000000000
SHCU PS2 MA 118933 O0 000 O0 0 6 1 1 4 68 0000000000
BSAL PS2 PPK 118933 O0 000 O0 0 6 1 1 4 68 0000000000
BSAL SIG PPK 118933 O0 000 O0 0 6 1 1 4 68 0000000000
CIRN PS2 118933 O0 000 O0 0 6 1 1 4 68 0000000000
CIRF PS2 118933 O0 000 O0 0 6 1 1 4 68 0000000000
CIRNFIL 118933 O0 000 O0 0 6 1 1 4 68 0000000000
CIRF FIL 118933 O0 000 O0 0 6 1 1 4 68 0000000000
DSIG PS2 CU 118933 O0 000 O0 0 6 1 1 4 68 0000000000
FBAC PS2 CPS 118933 O0 000 O0 0 6 1 1 4 68 0000000000
IRAT PS2 118933 O0 000 O0 0 6 1 1 4 68 0000000000
IRAT FIL 118933 O0 000 O0 0 6 1 1 4 68 0000000000
NBAC PS2 CPS 118933 O0 000 O0 0 6 1 1 4 68 0000000000
SFNA PS2 CU 118933 O0 000 O0 0 6 1 1 4 68 0000000000
SFFA PS2 CU 118933 O0 000 O0 0 6 1 1 4 68 0000000000
SBNA PS2 CU 118933 O0 000 O0 0 6 1 1 4 68 0000000000
SBFA PS2 CU 118933 O0 000 O0 0 6 1 1 4 68 0000000000
LIS Tape Verification Listing
Schlumberger Alaska Computing Center
17-NOV-1998 10:44
PAGE:
25
NAME SERV UNIT SERVICE API API API API FILE NUM~ NUFiB SIZE REPR PROCESS
ID ORDER # LOG TYPE CLASS MOD NUM~ SAMP ELEM CODE (HEX)
SFNA SIG CU 118933
SFFA SIG CU 118933
SBNA SIG CU 118933
SBFA SIG CU 118933
SFNA FIL CU 118933
SFFA FIL CU 118933
SBNA FIL CU 118933
SBFA FIL CU 118933
SIBF PS2 CU 118933
SFNC PS2 CU 118933
SFFC PS2 CU 118933
SIGM PS2 CU 118933
SIBF SIG CU 118933
SIGM SIG CU 118933
TRAT PS2 118933
TRAT SIG 118933
TRAT FIL 118933
GR PS2 GAPI 118933
RDIX PS2 118933
CRNI PS2 KHZ 118933
CRFI PS2 KHZ 118933
CTM PS2 DEGC 118933
XTM PS2 DEGC 118933
TAV PS2 KV 118933
FICU PS2 AMP 118933
CACU PS2 AMP 118933
BUST PS2 118933
BUSP PS2 118933
RSXS PS2 118933
TPHI PS2 PU 118933
TPHI SIG PU 118933
CCLC PS2 V 118933
RSCS PS2 118933
O0 000 O0 0 6 1 1 4 68 0000000000
O0 000 O0 0 6 1 1 4 68 0000000000
O0 000 O0 0 6 1 1 4 68 0000000000
O0 000 O0 0 6 1 1 4 68 0000000000
O0 000 O0 0 6 1 1 4 68 0000000000
O0 000 O0 0 6 1 1 4 68 0000000000
O0 000 O0 0 6 1 1 4 68 0000000000
O0 000 O0 0 6 1 1 4 68 0000000000
O0 000 O0 0 6 1 1 4 68 0000000000
O0 000 O0 0 6 1 1 4 68 0000000000
O0 000 O0 0 6 1 1 4 68 0000000000
O0 000 O0 0 6 1 1 4 68 0000000000
O0 000 O0 0 6 1 1 4 68 0000000000
O0 000 O0 0 6 1 1 4 68 0000000000
O0 000 O0 0 6 1 1 4 68 0000000000
O0 000 O0 0 6 1 1 4 68 0000000000
O0 000 O0 0 6 1 1 4 68 0000000000
O0 000 O0 0 6 1 1 4 68 0000000000
O0 000 O0 0 6 1 1 4 68 0000000000
O0 000 O0 0 6 1 1 4 68 0000000000
O0 000 O0 0 6 1 1 4 68 0000000000
O0 000 O0 0 6 1 1 4 68 0000000000
O0 000 O0 0 6 1 1 4 68 0000000000
O0 000 O0 0 6 1 1 4 68 0000000000
O0 000 O0 0 6 1 1 4 68 0000000000
O0 000 O0 0 6 1 1 4 68 0000000000
O0 000 O0 0 6 1 1 4 68 0000000000
O0 000 O0 0 6 1 1 4 68 0000000000
O0 000 O0 0 6 1 1 4 68 0000000000
O0 000 O0 0 6 1 1 4 68 0000000000
O0 000 O0 0 6 1 1 4 68 0000000000
O0 000 O0 0 6 1 1 4 68 0000000000
O0 000 O0 0 6 1 1 4 68 0000000000
** DATA **
DEPT. 9750.000 CS.PS2
NPDE. PS2 1469.613 NSCE.PS2
AQTM. PS2 0.441 CHV. PS2
CM2V. PS2 -12.191 RCFR.PS2
RCAK. PS2 0.000 RTDF. PS2
FSCE. PS2 1.879 FSCR.PS2
HVPV. PS2 163.574 BMCU. PS2
NBEF. PS2 26.916 FBEF. PS2
BSTR.PS2 45.689 BSPR.PS2
XPSV. PS2 5.089 XP2V. PS2
RXLC. PS2 0.000 RXRC.PS2
BSAL.PS2 -999.250 BSAL.SIG
CIRN. FIL -999.250 CIRF. FIL
2114 239
2 303
202 792
0 000
0 000
0 287
31 054
53.707
1.137
12.188
0.000
-999.250
-999.250
TENS.PS2 1133.000 NPHV. PS2
CRRA. PS2 1.995 NSCR.PS2
CPSV. PS2 5.069 CP2V. PS2
RCLC. PS2 0.000 RCRC. PS2
FPHV. PS2 1540.529 FPDE. PS2
AQTF. PS2 0.441 SF6P.PS2
GDCU. PS2 60.012 EXCU. PS2
NPGF. PS2 1.000 FPGF. PS2
MARC. PS2 0.000 XHV. PS2
X~2V. PS2 -12.348 RXFR.PS2
RXAK. PS2 0.000 SHCU. PS2
CIRN. PS2 -999.250 CIRF. PS2
DSIG.PS2 -999.250 FBAC. PS2
1501 466
0 330
12 100
0 000
1505 433
145 212
4 734
1 004
200 370
0 000
40 650
-999.250
-999.250
LIS Tape Verification Listing
Schlumberger Alaska Computing Center
17-NOV-1998 10:44
PAGE:
26
IRAT. PS2 -999.250 IRAT. FIL -999.250 i~BAC. PS2
SFFA.PS2 -999.250 SBNA.PS2 -999.250 SBFA.PS2
SFFA.SIG -999.250 SBNA.SIG -999.250 SBFA.SIG
SFFA.FIL -999.250 SBNA.FIL -999.250 SBFA.FIL
SFNC. PS2 -999.250 SFFC. PS2 -999.250 SIGM. PS2
SIGM. SIG -999.250 TRAT. PS2 -999.250 TRAT. SIG
GR.PS2 121.128 RDIX. PS2 18123.000 CRNI.PS2
CTM. PS2 95.215 XTM. PS2 94.238 TAV. PS2
CACU. PS2 2.476 BUST. PS2 3.000 BUSP. PS2
TPHI.PS2 -999.250 TPHI.SIG -999.250 CCLC. PS2
-999.250 SFNA.PS2
-999.250 SFNA.SIG
-999.250 SFNA.FIL
-999.250 SIBF. PS2
-999.250 SIBF. SIG
-999.250 TRAT. FIL
449.741 CRFI.PS2
95.031 FICU. PS2
3.000 RSXS.PS2
-0.011 RSCS.PS2
-999.250
-999.250
-999.250
-999.250
-999.250
-999.250
225.399
2.305
8878.000
8459.000
** END OF DATA **
**** FILE TRAILER ****
FILE NAME : EDIT .006
SERVICE . FLIC
VERSION : O01CO1
DATE : 98/11/17
MAX REC SIZE : 1024
FILE TYPE : LO
LAST FILE :
**** FILE HEADER ****
FILE NAME : EDIT .007
SERVICE · FLIC
VERSION - O01CO1
DATE · 98/11/17
MAX REC SIZE : 1024
FILE TYPE : LO
LAST FILE :
FILE HEADER
FILE NTJMBER 7
RAW CURVES
Curves and log header data for each pass in separate files; raw background pass in last file
PASS NUMBER: 3
DEPTH INCREMENT: 0. 5000
FILE SUMMARY
VENDOR TOOL CODE START DEPTH
RST 9754.5
$
LOG HEADER DATA
DATE LOGGED:
SOFTWARE VERSION:
TIME LOGGER ON BOTTOM:
STOP DEPTH
9414.0
26-AUG-98
8Cl -205
1944 26-AUG-98
LIS Tape Verification Listing
Schlumberger Alaska Computing Center
17-NOV-1998 10:44
PAGE:
27
TD DRILLER (FT) :
TD LOGGER (FT) :
TOP LOG INTERVAL (FT) :
BOTTOM LOG INTERVAL (FT) :
LOGGING SPEED (FPHR) :
DEPTH CONTROL USED (YES/NO) :
9845.0
9466.0
9741.0
TOOL STRING (TOP TO BOTTOM)
VENDOR TOOL CODE TOOL TYPE
GR GAMMA RAY
RST RESERVOIR SATURATION
$
TOOL NUMBER
CGRS-A
RST-A
BOREHOLE AND CASING DATA
OPEN HOLE BIT SIZE (IN):
DRILLERS CASING DEPTH (FT) :
LOGGERS CASING DEPTH (FT):
6.000
9959.0
BOREHOLE CONDITIONS
FLUID TYPE:
FLUID DENSITY (LB/G):
SURFACE TEMPERATURE (DEGF) :
BOTTOM HOLE TEMPERATURE (DEGF):
FLUID SALINITY (PPM) :
FLUID LEVEL (FT) :
FLUID RATE AT WELLHEAD (BPM):
WATER CUTS (PCT) :
GAS~OIL RATIO:
CHOKE (DEG) :
PRODUCED FLUIDS
218.0
NEUTRON TOOL
TOOL TYPE (EPITHERMAL OR THE~):
MATRIX:
MATRIX DENSITY:
HOLE CORRECTION (IN):
THERMAL
SANDSTONE
2.65
BLUELINE COUNT RATE NORMALIZATION IN OIL ZONE
TOP NORMALIZING WINDOW (FT) :
BASE NORMALIZING WINDOW (FT) :
BLUELINE COUNT RATE SCALES SET BY FIELD ENGINEER
FAR COUNT RATE LOW SCALE (CPS): 0
FAR COUNT RATE HIGH SCALE (CPS): 6
NEAR COUNT RATE LOW SCALE (CPS): 0
NEAR COUNT RATE HIGH SCALE (CPS) '. 3
TOOL STANDOFF (IN):
REMARKS:
DEPTH CORRELATED TO USIT-CNL-GR OF 8-JUL-1998
USED RST WITH CPLC
WELL SHUT IN TO RUN IN HOLE AND LOGGED AFTER 1 HR
STAB TIME.
WELL PUT IN TEST DURING JOB FOR 8 HOURS.
LOGGED THREE PASSES, 2 AT 1800 FPH AND ONE AT 600 FPH
ALL PASSES MADE WITH WELL FLOWING
LIS Tape Verification Listing
Schlumberger Alaska Computing Center
17-NOV-1998 10:44
PAGE: 28
MOST RECENT TEST PRIOR TO LOGGING 08-21-98
GFR 1.88, NOR1.74 MBOPD, NWR .14 M~BWPD,FGR 6.29 14MCFD
GLR=O, CK 94, 190 PSIG WHP, 112 DEGF WHT
WHILE LOGGING WHP 240 PSI, 103 DEGF
THIS FILE CONTAINS THE RAW DATA FOR BASE PASS #3.
$
LIS FORMAT DATA
** DATA FORMAT SPECIFICATION RECORD **
** SET TYPE - 64EB **
TYPE REPR CODE VALUE
1 66 0
2 66 0
3 73 368
4 66 1
5 66
6 73
7 65
8 68 0.5
9 65 FT
11 66 2
12 68
13 66 0
14 65 FT
15 66 68
16 66 1
0 66 1
** SET TYPE - CHAN **
NAME SERV UNIT SERVICE API API API API FILE NUMB NUMB SIZE REPR PROCESS
ID ORDER # LOG TYPE CLASS MOD NUM~ SAMP ELEM CODE (HEX)
DEPT FT 118933 O0 000 O0 0 7 1 1 4 68 0000000000
CS PS3 F/HR 118933 O0 000 O0 0 7 1 1 4 68 0000000000
TENS PS3 LB 118933 O0 000 O0 0 7 1 1 4 68 0000000000
NPHVPS3 V 118933 O0 000 O0 0 7 1 1 4 68 0000000000
NPDE PS3 V 118933 O0 000 O0 0 7 1 1 4 68 0000000000
NSCE PS3 V 118933 O0 000 O0 0 7 1 1 4 68 0000000000
CRRA PS3 118933 O0 000 O0 0 7 1 1 4 68 0000000000
NSCR PS3 118933 O0 000 O0 0 7 1 1 4 68 0000000000
AQTMPS3 S 118933 O0 000 O0 0 7 1 1 4 68 0000000000
CHV PS3 V 118933 O0 000 O0 0 7 1 1 4 68 0000000000
CPSV PS3 V 118933 O0 000 O0 0 7 1 1 4 68 0000000000
CP2V PS3 V 118933 O0 000 O0 0 7 1 1 4 68 0000000000
CM2V PS3 V 118933 O0 000 O0 0 7 1 1 4 68 0000000000
RCFR PS3 118933 O0 000 O0 0 7 1 1 4 68 0000000000
LIS Tape Verification Listing
Schlumberger Alaska Computing Center
17-NOV-1998 10:44
PAGE:
29
NAME SERV UNIT SERVICE API API API API FILE NUM~ NUMB SIZE REPR PROCESS
ID ORDER # LOG TYPE CLASS MOD NUMB SAMP ELEM CODE (HEX)
RCLC PS3 118933 O0 000 O0 0 7 1 1 4 68 0000000000
RCRC PS3 118933 O0 000 O0 0 7 1 1 4 68 0000000000
RCAK PS3 118933 O0 000 O0 0 7 1 1 4 68 0000000000
RTDF PS3 118933 O0 000 O0 0 7 1 1 4 68 0000000000
FPHVPS3 V 118933 O0 000 O0 0 7 1 1 4 68 0000000000
FPDE PS3 V 118933 O0 000 O0 0 7 1 1 4 68 0000000000
FSCE PS3 V 118933 O0 000 O0 0 7 1 1 4 68 0000000000
FSCR PS3 118933 O0 000 O0 0 7 1 1 4 68 0000000000
AQTF PS3 S 118933 O0 000 O0 0 7 1 1 4 68 0000000000
SF6P PS3 PSIG 118933 O0 000 O0 0 7 1 1 4 68 0000000000
HVPV PS3 V 118933 O0 000 O0 0 7 1 1 4 68 0000000000
BMCU PS3 UA 118933 O0 000 O0 0 7 1 1 4 68 0000000000
GDCU PS3 MA 118933 O0 000 O0 0 7 1 1 4 68 0000000000
EXCU PS3 UA 118933 O0 000 O0 0 7 1 1 4 68 0000000000
NBEF PS3 UA 118933 O0 000 O0 0 7 1 1 4 68 0000000000
FBEF PS3 UA 118933 O0 000 O0 0 7 1 1 4 68 0000000000
NPGF PS3 118933 O0 000 O0 0 7 1 1 4 68 0000000000
FPGF PS3 118933 O0 000 O0 0 7 1 1 4 68 0000000000
BSTR PS3 118933 O0 000 O0 0 7 1 1 4 68 0000000000
BSPR PS3 118933 O0 000 O0 0 7 1 1 4 68 0000000000
MARC PS3 118933 O0 000 O0 0 7 1 1 4 68 0000000000
XHV PS3 V 118933 O0 000 O0 0 7 1 1 4 68 0000000000
XPSV PS3 V 118933 O0 000 O0 0 7 1 1 4 68 0000000000
XP2V PS3 V 118933 O0 000 O0 0 7 1 1 4 68 0000000000
XM2V PS3 V 118933 O0 000 O0 0 7 1 1 4 68 0000000000
RXFR PS3 118933 O0 000 O0 0 7 1 1 4 68 0000000000
RXLC PS3 118933 O0 000 O0 0 7 1 1 4 68 0000000000
RXRC PS3 118933 O0 000 O0 0 7 1 1 4 68 0000000000
RXAKPS3 118933 O0 000 O0 0 7 1 1 4 68 0000000000
SHCU PS3 MA 118933 O0 000 O0 0 7 1 1 4 68 0000000000
BSAL PS3 PPK 118933 O0 000 O0 0 7 1 1 4 68 0000000000
BSAL SIG PPK 118933 O0 000 O0 0 7 1 1 4 68 0000000000
CIRNPS3 118933 O0 000 O0 0 7 1 1 4 68 0000000000
CIRF PS3 118933 O0 000 O0 0 7 1 1 4 68 0000000000
CIRNFIL 118933 O0 000 O0 0 7 1 1 4 68 0000000000
CIRF FIL 118933 O0 000 O0 0 7 1 1 4 68 0000000000
DSIG PS3 CU 118933 O0 000 O0 0 7 1 1 4 68 0000000000
FBAC PS3 CPS 118933 O0 000 O0 0 7 1 1 4 68 0000000000
IRAT PS3 118933 O0 000 O0 0 7 1 1 4 68 0000000000
IRAT FIL 118933 O0 000 O0 0 7 1 1 4 68 0000000000
NBAC PS3 CPS 118933 O0 000 O0 0 7 1 1 4 68 0000000000
SFNA PS3 CU 118933 O0 000 O0 0 7 1 1 4 68 0000000000
SFFA PS3 CU 118933 O0 000 O0 0 7 1 1 4 68 0000000000
SBNA PS3 CU 118933 O0 000 O0 0 7 1 1 4 68 0000000000
SBFA PS3 CU 118933 O0 000 O0 0 7 1 1 4 68 0000000000
SFNA SIG CU 118933 O0 000 O0 0 7 1 1 4 68 0000000000
SFFA SIG CU 118933 O0 000 O0 0 7 1 1 4 68 0000000000
SBNA SIG CU 118933 O0 000 O0 0 7 1 1 4 68 0000000000
SBFA SIG CU 118933 O0 000 O0 0 7 1 1 4 68 0000000000
SFNA FIL CU 118933 O0 000 O0 0 7 1 1 4 68 0000000000
SFFA FIL CU 118933 O0 000 O0 0 7 1 1 4 68 0000000000
LIS Tape Verification Listing
Schlumberger Alaska Computing Center
17-NOV-1998 10:44
PAGE:
3O
NAME SERV UNIT SERVICE API API API API FILE NUMB NUM~ SIZE REPR PROCESS
ID ORDER # LOG TYPE CLASS MOD NUMB SAMP ELEM CODE (HEX)
SBNA FIL CU 118933
SBFA FIL CU 118933
SIBF PS3 CU 118933
SFNC PS3 CU 118933
SFFC PS3 CU 118933
SIGM PS3 CU 118933
SIBF SIG CU 118933
SIGM SIG CU 118933
TRAT PS3 118933
TRAT SIG 118933
TRAT FIL 118933
GR PS3 GAPI 118933
RDIX PS3 118933
CRNI PS3 KHZ 118933
CRFI PS3 KHZ 118933
CTM PS3 DEGC 118933
XTM PS3 DEGC 118933
TAV PS3 KV 118933
FICU PS3 AMP 118933
CACU PS3 AMP 118933
BUST PS3 118933
BUSP PS3 118933
RSXS PS3 118933
TPHI PS3 PU 118933
TPHI SIG PU 118933
CCLC PS3 V 118933
RSCS PS3 118933
O0 000 O0 0 7 1 1 4 68 0000000000
O0 000 O0 0 7 1 1 4 68 0000000000
O0 000 O0 0 7 1 1 4 68 0000000000
O0 000 O0 0 7 1 1 4 68 0000000000
O0 000 O0 0 7 1 1 4 68 0000000000
O0 000 O0 0 7 1 1 4 68 0000000000
O0 000 O0 0 7 1 1 4 68 0000000000
O0 000 O0 0 7 1 1 4 68 0000000000
O0 000 O0 0 7 1 1 4 68 0000000000
O0 000 O0 0 7 1 1 4 68 0000000000
O0 000 O0 0 7 1 1 4 68 0000000000
O0 000 O0 0 7 1 1 4 68 0000000000
O0 000 O0 0 7 1 1 4 68 0000000000
O0 000 O0 0 7 1 1 4 68 0000000000
O0 000 O0 0 7 1 1 4 68 0000000000
O0 000 O0 0 7 1 1 4 68 0000000000
O0 000 O0 0 7 1 1 4 68 0000000000
O0 000 O0 0 7 1 1 4 68 0000000000
O0 000 O0 0 7 1 1 4 68 0000000000
O0 000 O0 0 7 1 1 4 68 0000000000
O0 000 O0 0 7 1 1 4 68 0000000000
O0 000 O0 0 7 1 1 4 68 0000000000
O0 000 O0 0 7 1 1 4 68 0000000000
O0 000 O0 0 7 1 1 4 68 0000000000
O0 000 O0 0 7 1 1 4 68 0000000000
O0 000 O0 0 7 1 1 4 68 0000000000
O0 000 O0 0 7 1 1 4 68 0000000000
** DATA **
DEPT.
NPDE. PS3
AQTM. PS3
CM2 V. PS3
RCAK. PS3
FSCE. PS3
HVPV. PS3
NBEF. PS3
BSTR.PS3
XPSV. PS3
RXLC. PS3
BSAL.PS3
CIRN. FIL
IRAT. PS3
SFFA.PS3
SFFA.SIG
SFFA.FIL
SFNC. PS3
SIGM. SIG
9750.000
1470.834
0.441
-12.191
0 000
1 956
164 063
26 702
45 167
5 079
0 000
-999 250
-999 250
-999 250
-999 250
-999 250
-999 250
-999 250
-999.250
CS.PS3 896.995 TENS. PS3
NSCE. PS3 2.318 CRRA.PS3
CHV. PS3 202.792 CPSV. PS3
RCFR.PS3 0.000 RCLC. PS3
RTDF. PS3 0.000 FPHV. PS3
FSCR.PS3 -0.209 AQTF. PS3
BMCU. PS3 31.054 GDCU. PS3
FBEF. PS3 56.078 NPGF. PS3
BSPR.PS3 1.098 MARC. PS3
XP2V. PS3 12.188 XM2V. PS3
RXRC. PS3 0.000 RXAK. PS3
BSAL.SIG -999.250 CIRN. PS3
CIRF. FIL -999.250 DSIG. PS3
IRAT. FIL -999.250 NBAC. PS3
SBNA.PS3 -999.250 SBFA.PS3
SBNA.SIG -999.250 SBFA.SIG
SBNA.FIL -999.250 SBFA.FIL
SFFC. PS3 -999.250 SIGM. PS3
TRAT. PS3 -999.250 TRAT. SIG
1118 000
2 100
5 069
0 000
1540 529
0 441
60 996
1 001
0 000
-12.348
0.000
-999.250
-999.250
~999.250
-999.250
-999.250
-999.250
-999.250
-999.250
NPHV. PS3
NSCR.PS3
CP2V. PS3
RCRC. PS3
FPDE. PS3
SF6P.PS3
EXCU. PS3
FPGF. PS3
XAW. PS3
RXFR.PS3
SHCU. PS3
CIRF. PS3
FBAC. PS3
SFNA.PS3
SFNA.SIG
SFNA.FIL
SIBF. PS3
SIBF. SIG
TRAT.FIL
1501.466
-0.156
12.100
0.000
1503. 640
147. 771
4. 734
1.004
200.370
0.000
40.324
-999.250
-999.250
-999.250
-999.250
-999.250
-999.250
-999.250
-999.250
LIS Tape Verification Listing
Schlumberger Alaska Computing Center
17-NOV-1998 10:44
PAGE:
31
GR.PS3 121.128 RDIX. PS3 29988.000 CRNI.PS3
CTM. PS3 95.215 XTM. PS3 92.774 TAV. PS3
CACU. PS3 2.476 BUST. PS3 3.000 BUSP.PS3
TPHI.PS3 -999.250 TPHI.SIG -999.250 CCLC.PS3
453.618 CRFI.PS3
95.031 FICU. PS3
3.000 RSXS.PS3
-0.003 RSCS.PS3
215.992
2.280
8878.000
8459.000
** END OF DATA **
**** FILE TRAILER ****
FILE NAME : EDIT .007
SERVICE : FLIC
VERSION · O01CO1
DATE : 98/11/17
MAX REC SIZE : 1024
FILE TYPE : LO
LAST FILE :
**** TAPE TRAILER ****
SERVICE NAME : EDIT
DATE '. 98/11/17
ORIGIN : FLIC
TAPE NAME · 98594
CONTINUATION # : 1
PREVIOUS TAPE :
CO~94ENT ' BP EXPLORATION, N-14A, PRUDHOE BAY, API # 50-029-20594-01
**** REEL TRAILER ****
SERVICE NAME : EDIT
DATE : 98/11/17
ORIGIN : FLIC
REEL NAME : 98594
CONTINUATION # :
PREVIOUS REEL :
COf4~ENT : BP EXPLORATION, N-14A, PRUDHOE BAY, API# 50-029-20594-01
* ALASKA COMPUTING CENTER *
....... SCHLUMBERGER .......
COMPANY NAME : BP EXPLORATION
WELL NAM~ : N-14A
FIELD NAME : PRUDHOE BAY
BOROUGH : NORTH SLOPE
STATE : ALASKA
API NI3M~ER : 500292059401
REFERENCE NO : 98595
Date j~~~_~~
NOV 20 '1998
Alaska Oii& Gas Cons. Oommis$ior~
LIS Tape Verification Listing
Schlumberger Alaska Computing Center
17-NOV-1998 13:34
PAGE:
**** REEL HEADER **~*
SERVICE NAME : EDIT
DATE : 98/11/17
ORIGIN : FLIC
REEL NAME : 98595
CONTINUATION # :
PREVIOUS REEL :
COM~fF~VT : BP EXPLORATION, PRUDHOE BAY, N-14A, API# 50-029-20594-01
**** TAPE HEADER ****
SERVICE NAME : EDIT
DATE : 98/11/17
ORIGIN : FLIC
TAPE NAME : 98595
CONTINUATION # : 1
PREVIOUS TAPE :
COMMENT : BP EXPLORATION, PRUDHOE BAY, N-14A, API# 50-029-20594-01
TAPE HEADER
Prudhoe Bay
CASED HOLE WIRELINE LOGS
WELL NAME: N-14A
API NUMBER: 500292059401
OPERATOR: BP Expl oration
LOGGING COMPANY: SCHLUMBERGER WELL SERVICES
TAPE CREATION DATE: 17-NOV-98
JOB AU]MBER: 98595
LOGGING ENGINEER: C.A. Yon
OPERATOR WITNESS: L. Phong
SURFACE LOCATION
SECTION: 8
TOWNSHIP: 1 iN
RANGE .. 13 E
FNL: 3917
FSL :
FEL: 4731
FWL:
ELEVATION(FT FROM MSL O)
KELLY BUSHING: 74.47
DERRICK FLOOR:
GROUND LEVEL: 43.57
WELL CASING RECORD
OPEN HOLE CASING DRILLERS CASING
BIT SIZE (IN) SIZE (IN) DEPTH (FT) WEIGHT (LB/FT)
1ST STRING 6. 000 4. 500 9959.0
2ND STRING
3RD STRING
PRODUCTION STRING
CURVE SHIFT DATA - ALL PASSES TO STANDARD(MEASURED DEPTH)
LIS Tape Verification Listing
Schlumberger Alaska Computing Center
17-NOV-1998 13:34
BASELINE CURVE FOR SHIFTS
LDWG TOOL CODE: AIT
LDWG CURVE CODE: GR
RUN NUFiBER:
PASS NUMBER:
DATE LOGGED: 21-~-98
LOGGING COMPANY: SCHLUMBERGER WELL SERVICES
BASELINE DEPTH
88888.0
9771.0
9758.5
9748.0
9747.5
9720.0
9700.5
9688.5
9652.5
9630.0
9614.0
9596.5
9570 5
9563 5
9563 0
9552 5
9552 0
9540 5
9538 0
9536 0
9523.5
9516.0
9515.0
9504.5
9504.0
9497.0
9489.0
9480.0
9452.5
9437.5
9437.0
9434.0
9430.0
9397.0
9368.0
9353.0
9336.0
9333.0
9316.0
9307.5
9297.5
9284.5
9251.5
100.0
$
.......... EQUIVALENT UNSHIFTED DEPTH ..........
GRCH CNTG
88888.0 88888.0
9771.0 9771.0
9758.5
9747.5
9747.5
9719.5 9719.5
9700.0 9700.0
9688.5 9688.5
9653.0 9653.0
9630.0 9630.0
9615.0 9615.0
9597.0 9597.0
9570.5 9570.5
9563.0
9563.0
9552.5
9535.5
9522.5
9514.5
9502.5
9487.5
9479.0
9450.0
9435.5
9433.0
9427.5
9395.0
9365.0
9351.5
9332.5
9330.5
9313.5
9304.0
9293.0
9281.5
9250.0
98.5
9552.5
9541.5
9538.5
9535.5
9522.5
9514.5
9502.5
9495.0
9487.5
9479.0
9450.0
9435.5
9433.0
9427.5
9395.0
9365.0
9351.5
9332.5
9330.5
9313.5
9304.0
9293.0
9281.5
9250.0
98.5
PAGE:
LIS Tape Verification Listing
Schlumberger Alaska Computing Center
17-NOV-1998 13:34
CONTAINED HEREIN IS THE CNTG DATA ACQUIRED ON
BP EXPLORATION WELL N-14A ON 8-JUL-98. THE DEPTH SHIFTS
SHOWN ABOVE REFLECT CNTG PASS #1 GRCH TO THE BASELINE
GAMMA RAY PROVIDED BY THE CLIENT (GR.AIT) , AND PASS #1
NPHI TO GR.AIT. ALL OTHER CNTG CURVES WERE CARRIED WITH
THE NPHI SHIFT.
$
$
PAGE:
**** FILE HEADER ****
FILE NAME : EDIT .001
SERVICE : FLIC
VERSION : O01CO1
DATE : 98/11/17
MAX REC SIZE : 1024
FILE TYPE : LO
LAST FILE :
FILE HEADER
FILE NUMBER: I
EDITED CURVES
Depth shifted and clipped curves for each pass in separate files.
PASS NUMBER: 1
DEPTH INCREMENT: 0.5000
FILE S~Y
LDWG TOOL CODE START DEPTH STOP DEPTH
GRCH 9781.0 9246.0
ClTrG 9792.0 9246.0
$
CURVE SHIFT DATA - PASS TO PASS (MEASURED DEPTH)
BASELINE CURVE FOR SHIFTS
LDWG CURVE CODE:
PASS NUMBER:
BASELINE DEPTH
$
.......... EQUIVALENT UNSHIFTED DEPTH ..........
GRCH CNTG
REMARKS: THIS FILE CONTAINS THE CLIPPED AND DEPTH CORRECTED DATA
FOR CNTG PASS #1. NO PASS TO PASS SHIFTS WERE APPLIED
TO THIS DATA.
$
LIS FORMAT DATA
LIS Tape Verification Listing
Schlumberger Alaska Computing Center
17-NOV-1998 13:34
PAGE:
** DATA FORMAT SPECIFICATION RECORD **
** SET TYPE - 64EB **
TYPE REPR CODE VALUE
1 66 0
2 66 0
3 73 64
4 66 1
5 66
6 73
7 65
8 68 0.5
9 65 FT
11 66 16
12 68
13 66 0
14 65 FT
15 66 68
16 66 1
0 66 0
** SET TYPE - CHAN **
NAME SERV UNIT SERVICE API API API API FILE NUMB NUM~ SIZE REPR PROCESS
ID ORDER # LOG TYPE CLASS MOD NUMB SAMP ELEM CODE (HEX)
DEPT FT 1239866 O0 000 O0 0 1 1 1 4 68 0000000000
NPHI CNTG PU-S 1239866 O0 000 O0 0 1 1 1 4 68 0000000000
ENPH CNTG PU-S 1239866 O0 000 O0 0 1 1 1 4 68 0000000000
CPHI CNTG PU-S 1239866 O0 000 O0 0 1 1 1 4 68 0000000000
NRAT CNTG 1239866 O0 000 O0 0 1 1 1 4 68 0000000000
CRAT CNTG 1239866 O0 000 O0 0 1 1 1 4 68 0000000000
ENRA CNTG 1239866 O0 000 O0 0 1 1 1 4 68 0000000000
NCNT CNTG CPS 1239866 O0 000 O0 0 1 1 1 4 68 0000000000
FCNT CNTG CPS 1239866 O0 000 O0 0 1 1 1 4 68 0000000000
CNTC CNTG CPS 1239866 O0 000 O0 0 1 1 1 4 68 0000000000
CFTC CNTG CPS 1239866 O0 000 O0 0 1 1 1 4 68 0000000000
CNEC CNTG CPS 1239866 O0 000 O0 0 1 1 1 4 68 0000000000
CFEC CNTG CPS 1239866 O0 000 O0 0 1 1 1 4 68 0000000000
GRCH CNTG GAPI 1239866 O0 000 O0 0 1 1 1 4 68 0000000000
TENS CNTG LB 1239866 O0 000 O0 0 1 1 1 4 68 0000000000
CCL CNTG V 1239866 O0 000 O0 0 1 1 1 4 68 0000000000
** DATA **
DEPT. 9792.000 NPHI.CNTG 12.467 ENPH. CNTG 17.721 CPHI.CNTG
NRAT. CNTG 2.133 CRAT. CNTG 1.951 ENRA.CNTG 3.271 NCNT. CNTG
FCNT. CNTG 1781.594 CNTC. CNTG 3515.601 CFTC. CNTG 1813.154 CNEC. CNTG
CFEC. CNTG 1386.402 GRCH. CNTG -999.250 TENS. CNTG 4730.000 CCL.CNTG
16.421
3802.911
4534.423
1.283
LIS Tape Verification Listing
Schlumberger Alaska Computing Center
17-NOV-1998 13:34
PAGE:
DEPT. 9244.500 NPHI. CNTG 48.181 ENPH. CNTG
NRAT. CNTG 4.613 CRAT. CNTG 4.046 E1VRA.CNTG
FCNT. CNTG 260.958 CNTC.CNTG 1103.846 CFTC. ClFTG
CFEC. CNTG 468.693 GRCH. CNTG 66.587 TENS.CNTG
45.407 CPHI.CNTG
6.081 NCNT. CNTG
277.468 CNEC. CNTG
4388.000 CCL.CNTG
47.732
1144.667
2850.090
1.198
** END OF DATA **
**** FILE TRAILER ****
FILE NAME : EDIT .001
SERVICE : FLIC
VERSION : O01CO1
DATE : 98/11/17
MAX REC SIZE : 1024
FILE TYPE : LO
LAST FILE :
**** FILE HEADER ****
FILE NAME : EDIT .002
SERVICE : FLIC
VERSION : O01CO1
DATE : 98/11/17
MAX REC SIZE : 1024
FILE TYPE : LO
LAST FILE :
FILE HEADER
FILE NIIMBER: 2
EDITED CURVES
Depth shifted and clipped curves for each pass in separate files.
PASS NUMBER: 2
DEPTH INCREMENT: O. 5000
FILE SUMM3LgY
LDWG TOOL CODE START DEPTH STOP DEPTH
GRCH 9783.0 9248.0
CNTG 9794.0 9248.0
$
CURVE SHIFT DATA - PASS TO PASS (MEASURED DEPTH) BASELINE CURVE FOR SHIFTS
LDWG CURVE CODE: GRCH
PASS NUM~ER: 1
BASELINE DEPTH
.......... EQUIVALENT UNSHIFTED DEPTH ..........
GRCH CNTG
LIS Tape Verification Listing
Schlumberger Alaska Computing Center
17-NOV-1998 13:34
PAGE:
88888.0
9775.5
9770.5
9755.5
9747.0
9726.5
9719.0
9685.0
9676.0
9664.5
9652.5
9636.5
9629.0
9627.5
9614.0
9613.5
9606.5
9602.0
9596.0
9590.5
9576.0
9570.0
9562.0
9555.5
9551.5
9551.0
9540.0
9539.5
9537.0
9535.0
9527.5
9525.5
9512 0
9491 5
9488 0
9479 5
9469 5
9461 5
946O 5
9452 0
9451.5
9436.5
9432.5
9431.5
9429.0
9428.5
9408.0
9407.0
9396.5
9392.5
9387. 0
9386.5
9367.0
9352.0
9331.5
88888.5
9771.0
9747.5
9719.5
9677.0
9653.5
9630.0
9615.0
9603.5
9597.0
9571.0
9563.5
9553.0
9541.5
9535.5
9525.5
9512.0
9491.0
9479.5
946O.5
9450.5
9436.0
9432.5
9427.5
9407.0
9396.0
9385.5
9365.0
9330.5
88889.0
9776.5
9755.5
9747.5
9727.0
9685.5
9665.0
9637.0
9628.0
9615.5
9608.0
9592.0
9577.0
9563.5
9556.0
9552.5
9541.5
9538.0
9527.0
9487.5
9469. 0
9460.0
9450.0
9435.5
9431.5
9428.0
9405.0
9391.0
9385.5
9352.5
LIS Tape Verification Listing
Schlumberger Alaska Computing Center
17-NOV-1998 13:34
PAGE:
9316.0
9314.0
9268.5
9253.0
100.0
$
9315.0
9311.5
9267.0 9267.5
9252.5
99.5 99.0
REFIARKS: THIS FILE CONTAINS THE CLIPPED AND DEPTH CORRECTED DATA
FOR CNTG PASS #2. THE DEPTH SHIFTS SHOW1VABOVEREFLECT
PASS #2 GRCH TO PASS #1 GRCH; AND PASS #2 NPHI TO PASS
#1 NPHI. ALL OTHER CNTG CURVES WERE CARRIED WITH THE
NPHI SHIFT.
$
LIS FORMAT DATA
** DATA FORMAT SPECIFICATION RECORD **
** SET TYPE- 64EB **
TYPE REPR CODE VALUE
1 66 0
2 66 0
3 73 64
4 66 1
5 66
6 73
7 65
8 68 O. $
9 65 FT
11 66 16
12 68
13 66 0
14 65 FT
15 66 68
16 66 1
0 66 1
** SET TYPE - CHAN **
NAME SERV UNIT SERVICE API API API API FILE NUNiB AUJ?/IBSIZE REPR PROCESS
ID ORDER # LOG TYPE CLASS MOD NUMB SAMP ELEM CODE (HEX)
DEPT FT 1239866 O0 000 O0 0 2 1 1 4 68 0000000000
NPHI CNTG PU-S 1239866 O0 000 O0 0 2 1 1 4 68 0000000000
ENPH CNTG PU-S 1239866 O0 000 O0 0 2 1 1 4 68 0000000000
CPHI CNTG PU-S 1239866 O0 000 O0 0 2 1 1 4 68 0000000000
NRAT CNTG 1239866 O0 000 O0 0 2 1 1 4 68 0000000000
CRAT CNTG 1239866 O0 000 O0 0 2 1 1 4 68 0000000000
ENRA CNTG 1239866 O0 000 O0 0 2 1 1 4 68 0000000000
LIS Tape Verification Listing
Schlumberger Alaska Computing Center
17-NOV-1998 13:34
PAGE: 8
NAME SERV UNIT SERVICE API API API API FILE NUFiB NUM~ SIZE REPR PROCESS
ID ORDER # LOG TYPE CLASS MOD NUMB SAMP ELb~4 CODE (HEX)
NCNT CNTG CPS 1239866 O0 000 O0 0 2 1 1 4 68 0000000000
FCNTCNTG CPS 1239866 O0 000 O0 0 2 1 1 4 68 0000000000
CNTC CNTG CPS 1239866 O0 000 O0 0 2 1 1 4 68 0000000000
CFTC CNTG CPS 1239866 O0 000 O0 0 2 1 1 4 68 0000000000
CNEC CNTG CPS 1239866 O0 000 O0 0 2 1 1 4 68 0000000000
CFEC CNTG CPS 1239866 O0 000 O0 0 2 1 1 4 68 0000000000
GRCH CNTG GAPI 1239866 O0 000 O0 0 2 1 1 4 68 0000000000
TENS CNTG LB 1239866 O0 000 O0 0 2 1 1 4 68 0000000000
CCL CNTG V 1239866 O0 000 O0 0 2 1 1 4 68 0000000000
** DATA **
DEPT. 9795.000 NPHI.CNTG 15.131 ENPH. CNTG 19.678 CPHI. CNTG 19.077
NRAT. CNTG 2.229 CRAT. CNTG 2.150 ENRA.CNTG 3.510 NCNT. CNTG 3367.815
FCNT. CNTG 1422.772 CNTC.CNTG 2955.940 CFTC. CNTG 1388.969 CNEC. CNTG 4129.445
CFEC. CNTG 1176.579 GRCH. CNTG -999.250 TENS. CNTG 4670.000 CCL.CNTG 0.035
DEPT. 9247.000 NPHI.CNTG 42.868 ENPH. CNTG 44.280 CPHI.CNTG 40.972
NRAT. CNTG 3.978 CRAT. CNTG 3.754 ENRA.CNTG 5.987 NCNT. CNTG 1547.802
FCNT. CNTG 406.060 CNTC. CNTG 1382.775 CFTC. CNTG 387.505 ClVEC. CNTG 2707.705
CFEC. CNTG 452.235 GRCH. CNTG -999.250 TENS.CNTG 4501.000 CCL. CNTG 1.204
** END OF DATA **
**** FILE TRAILER ****
FILE NAME : EDIT .002
SERVICE ' FLIC
VERSION : O01CO1
DATE . 98/11/17
MAX REC SIZE : 1024
FILE TYPE : LO
LAST FILE :
**** FILE HEADER ****
FILE NAME : EDIT .003
SERVICE -FLIC
VERSION ·O01CO1
DATE : 98/11/17
MAX REC SIZE : 1024
FILE TYPE : LO
LAST FILE :
LIS Tape Verification Listing
Schlumberger Alaska Computing Center
17-NOV-1998 13:34
PAGE:
FILE HEADER
FILE ArUMBER : 3
EDITED CURVES
Depth shifted and clipped curves for each pass in separate files.
PASS NUMBER: 3
DEPTH INCREMENT: 0.5000
FILE SUb~ARY
LDWG TOOL CODE START DEPTH STOP DEPTH
GRCH 9785.0 9250.0
CNTG 9796.0 9250.0
$
CURVE SHIFT DATA - PASS TO PASS (MEASURED DEPTH)
BASELINE CURVE FOR SHIFTS
LDWG CURVE CODE: GRCH
PASS NtbIBER : 1
BASELINE DEPTH
88888.0
9775.5
9771.0
9756.0
9747.0
9746.5
9741.0
9726.5
9719.0
9708.5
9688.0
9676.5
9668.0
9665.0
9652.5
9637.5
9629.5
9628.0
9614.5
9607.0
9596.0
9576.0
9563 0
9552 5
9551 5
9540 0
9537 5
9536 0
9528 0
9515 0
9506.5
9496.5
9492.0
.......... EQUIVALENT UNSHIFTEDDEPTH ..........
GRCH CNTG
88888.0 88888.5
9771.0
9747.5
9719.5
9688.5
9677.0
9653.0
9630.0
9615.0
9596.5
9563.5
9553.0
9541.5
9535.5
9514.5
9505.5
9491.0
9776.0
9755.5
9747.5
9741.0
9727.0
9708.5
9668.0
9665.0
9638.5
9628.0
9608.0
9576.5
9553.0
9538.5
9527.0
9495.0
LIS Tape Verification Listing
Schlumberger Alaska Computing Center
17-NOV-1998 13:34
PAGE:
10
9488.0
9480.0
9474.5
9473.0
9471.0
9468.0
9466.0
9452.0
9451.5
9436.5
9433.0
9432.0
9431.0
9429.0
9426.0
9421.0
9413.0
9408.5
9408.0
9396.5
9392 5
9388 0
9368 0
9365 0
9350 5
9332 0
9295 0
9269 5
9269.0
9253.5
100.0
$
9479.5
9472.0
9466.0
9450.5
9435.5
9433.0
9430.5
9427.5
9420.0
9406.5
9395.5
9385.5
9365.0
9362.5
9348.0
9330.5
9293.0
9267.5
9252.0
98.5
9487.5
9473.5
9469.5
9465.0
9450.0
9431.0
9424.5
9410.5
9406.5
9391.0
9385.5
9267.5
98.0
REFIARJfS: THIS FILE CONTAINS THE CLIPPED AND DEPTH CORRECTED DATA
FOR CNTG PASS #3. THE DEPTH SHIFTS SHOWN ABOVE REFLECT
PASS #3 GRCH TO PASS #1 GRCH; AND PASS #3 NPHI TO PASS
#1 NPHI. ALLOTHER CNTG CURVES WERE CARRIED WITH THE
NPHI SHIFT.
LIS FORMAT DATA
** DATA FORMAT SPECIFICATION RECORD **
** SET TYPE - 64EB **
TYPE REPR CODE VALUE
1 66 0
2 66 0
3 73 64
4 66 1
LIS Tape Verification Listing
Schlumberger Alaska Computing Center
17-NOV-1998 13:34
PAGE: 11
TYPE REPR CODE VALUE
5 66
6 73
7 65
8 68 0.5
9 65 FT
11 66 16
12 68
13 66 0
14 65 FT
15 66 68
16 66 1
0 66 1
** SET TYPE - CHAN **
NAME SERV UNIT SERVICE API API API API FILE NUMB NUMB SIZE REPR PROCESS
ID ORDER # LOG TYPE CLASS MOD NUM~ SAMP ELEM CODE (HEX)
O0 000 O0 0 3 1 1 4 68 0000000000
DEPT FT 1239866
NPHI CNTG PU-S 1239866 O0 000 O0 0 3 1 1 4 68 0000000000
ENPH CNTG PU-S 1239866 O0 000 O0 0 3 1 1 4 68 0000000000
CPHI CNTG PU-S 1239866 O0 000 O0 0 3 1 1 4 68 0000000000
NRAT CNTG 1239866 O0 000 O0 0 3 1 1 4 68 0000000000
CRAT CNTG 1239866 O0 000 O0 0 3 1 1 4 68 0000000000
EiVRACNTG 1239866 O0 000 O0 0 3 1 1 4 68 0000000000
NCNT CNTG CPS 1239866 O0 000 O0 0 3 1 1 4 68 0000000000
FCNT CNTG CPS 1239866 O0 000 O0 0 3 1 1 4 68 0000000000
CNTC CNTG CPS 1239866 O0 000 O0 0 3 1 1 4 68 0000000000
CFTC CNTG CPS 1239866 O0 000 O0 0 3 1 1 4 68 0000000000
CNEC CNTG CPS 1239866 O0 000 O0 0 3 1 1 4 68 0000000000
CFEC CNTG CPS 1239866 O0 000 O0 0 3 1 1 4 68 0000000000
GRCH CNTG GAPI 1239866 O0 000 O0 0 3 1 1 4 68 0000000000
TENS CNTG LB 1239866 O0 000 O0 0 3 1 1 4 68 0000000000
CCL CNTG V 1239866 O0 000 O0 0 3 1 1 4 68 0000000000
** DATA **
DEPT. 9796.500 NPHI.CNTG 16.220 ENPH. CNTG 22.091 CPHI. CNTG
NRAT. CNTG 2.286 CRAT. CNTG 2.227 ENRA. CNTG 3.795 NCNT. CNTG
FCNT. CNTG 1291.441 CNTC. CNTG 2996.826 CFTC. CNTG 1330.223 CNEC. CNTG
CFEC. CNTG 1010.739 GRCH. CNTG -999.250 TENS.CNTG 4762.000 CCL.CNTG
DEPT. 9248.000 NPHI. CNTG 47.358 ENPH. CNTG 35.506 CPHI.CNTG
NRAT. CNTG 4.186 CRAT. CNTG 4.000 EArRA.CNTG 5.206 NCNT. CNTG
FCNT. CNTG 351.669 CNTC. CNTG 1413.640 CFTC. CNTG 352.475 CNEC. CNTG
CFEC. CNTG 522.523 GRCH. CNTG -999.250 TENS. CNTG 4405.000 CCL. CNTG
20.856
3240.992
3835.908
0.726
48.276
1515.743
2719.998
1.171
LIS Tape Verification Listing
Schlumberger Alaska Computing Center
17-NOV-1998 13:34
PAGE:
12
** END OF DATA **
**** FILE TRAILER ****
FILE NAME : EDIT .003
SERVICE : FLIC
VERSION : O01CO1
DATE : 98/11/17
MAX REC SIZE : 1024
FILE TYPE : LO
LAST FILE :
**** FILE HEADER ****
FILE NAME : EDIT .004
SERVICE · FLIC
VERSION : O01CO1
DATE : 98/11/17
MAX REC SIZE : 1024
FILE TYPE : LO
LAST FILE :
FILE HEADER
FILE NUMBER: 4
AVERAGED CURVES
Compensated Neutron: Arithmetic average of edited passes for all curves.
DEPTH INCREMENT 0.5000
PASSES INCLUDED IN AVERAGE
LDWG TOOL CODE PASS NUP1BERS
1, 2, 3,
CNTG
$
REMARKS:
THE ARITHMETIC AVERAGE WAS CALCULATED AFTER CLIPPING
AND DEPTH CORRECTIONS WERE APPLIED.
$
LIS FORMAT DATA
LIS Tape Verification Listing
Schlumberger Alaska Computing Center
17-NOV-1998 13:34
PAGE
13
** DATA FORMAT SPECIFICATION RECORD **
** SET TYPE - 64EB **
TYPE REPR CODE VALUE
1 66 0
2 66 0
3 73 56
4 66 1
5 66
6 73
7 65
8 68 0.5
9 65 FT
11 66 18
12 68
13 66 0
14 65 FT
15 66 68
16 66 1
0 66 1
** SET TYPE - CHAN **
NAME SERV UNIT SERVICE API API API API FILE NUM~ NUMB SIZE REPR PROCESS
ID ORDER # LOG TYPE CLASS MOD NUMB SAMP ELEM CODE (HEX)
DEPT FT 1239866 O0 000 O0 0 4 1 1 4 68 0000000000
NPHI CNAV PU-S 1239866 O0 000 O0 0 4 1 1 4 68 0000000000
NRAT CNAV 1239866 O0 000 O0 0 4 1 I 4 68 0000000000
CPHI CNAV PU-S 1239866 O0 000 O0 0 4 1 1 4 68 0000000000
CRAT CNAV 1239866 O0 000 O0 0 4 1 I 4 68 0000000000
ENPH CNAV PU-S 1239866 O0 000 O0 0 4 1 1 4 68 0000000000
ENRA CNAV 1239866 O0 000 O0 0 4 1 1 4 68 0000000000
NCNT CNAV CPS 1239866 O0 000 O0 0 4 1 1 4 68 0000000000
FCNT CNAV CPS 1239866 O0 000 O0 0 4 1 1 4 68 0000000000
CNTC CNAV CPS 1239866 O0 000 O0 0 4 1 1 4 68 0000000000
CFTC CNAV CPS 1239866 O0 000 O0 0 4 1 1 4 68 0000000000
CNEC CNAV CPS 1239866 O0 000 O0 0 4 1 1 4 68 0000000000
CFEC CNAV CPS 1239866 O0 000 O0 0 4 1 1 4 68 0000000000
GRCH CNTG GAPI 1239866 O0 000 O0 0 4 1 1 4 68 0000000000
** DATA **
DEPT. 9792.000 NPHI. CNAV 11.977 NRAT. CNAV 2.062 CPHI. CNAV
CRA T. CNA V 1.912 EN PH . CNA V 16.896 ENRA . CNA V 3.167 N CNT . CNA V
FCNT. CNAV 1746.543 CNTC. CNAV 3530.664 CFTC. CNAV 1815.169 CNEC. CNAV
CFEC. CNAV 1407. 744 GRCH. CNTG -999.250
16.505
3783.771
4458.179
LIS Tape ver~if~ication Listing
Schlumberger Alaska Computing Center
17-NOV-1998 13:34
PAGE:
14
DEPT. 9244.500 NPHI. CNAV -999.250 NRAT. CNAV -999.250 CPHI.CNAV -999.250
CRAT. CNAV -999.250 ENPH. CNAV -999.250 ENRA.CNAV -999.250 NCNT. CNAV -999.250
FCNT. CNAV -999.250 CNTC. CNAV -999.250 CFTC. CNAV -999.250 CNEC. CNAV -999.250
CFEC. CNAV -999.250 GRCH. CNTG 66.587
** END OF DATA **
**** FILE TRAILER ****
FILE NAME : EDIT .004
SERVICE : FLIC
VERSION : O01CO1
DATE : 98/11/17
MAX REC SIZE : 1024
FILE TYPE : LO
LAST FILE :
**** FILE HEADER ****
FILE NAME : EDIT .005
SERVICE : FLIC
VERSION : O01CO1
DATE : 98/11/17
MAX REC SIZE : 1024
FILE TYPE : LO
LAST FILE :
FILE HEADER
FILE NUMBER 5
RAW CURVES
Curves and log header data for each pass in separate files; raw background pass in last file
PASS NUMBER: 1
DEPTH INCREMENT: 0.5000
FILE SUMMARY
VENDOR TOOL CODE START DEPTH
CNTG 9842.0
$
LOG HEADER DATA
DATE LOGGED:
SOFTWARE VERSION:
TIME LOGGER ON BOTTOM:
TD DRILLER (FT) :
TD LOGGER (FT) :
TOP LOG INTERVAL (FT) :
BOTTOM LOG INTERVAL (FT) :
LOGGING SPEED (FPHR):
DEPTH CONTROL USED (YES/NO):
STOP DEPTH
9243.5
8-JUL-98
8Ct-205
1759 8-JUL-98
9960.0
9847.0
9240.0
9847.0
1800.0
NO
LIS Tape Verification Listing
Schlumberger Alaska Computing Center
17-NOV-1998 13:34
PAGE:
15
TOOL STRING (TOP TO BOTTOM)
VENDOR TOOL CODE TOOL TYPE
.........................
GR GAMMA RAY
CNTG COMP. NEUTRON
$
BOREHOLE AND CASING DATA
OPEN HOLE BIT SIZE (IN)
DRILLERS CASING DEPTH (FT)
LOGGERS CASING DEPTH (FT)
TOOL NUMBER
SGT-L 53
CNT-G
6.000
9959.0
BOREHOLE CONDITIONS
FLUID TYPE:
FLUID DENSITY (LB/G):
SURFACE TEMPERATURE (DEGF) :
BOTTOM HOLE TEMPERATURE (DEGF) :
FLUID SALINITY (PPM) :
FLUID LEVEL (FT) :
FLUID RATE AT WELLHEAD (BPM):
WATER CUTS (PCT) :
GAS~OIL RATIO:
CHOKE (DEG) :
Brine
NEUTRON TOOL
TOOL TYPE (EPITHERMAL OR THERMAL):
MATRIX:
MATRIX DENSITY:
HOLE CORRECTION (IN) '.
THERMAL
SANDSTONE
2.65
BLUELINE COUNT RATE NORMALIZATION IN OIL ZONE
TOP NORMALIZING WINDOW (FT) :
BASE NORMALIZING WINDOW (FT) :
BLUELINE COUNT RATE SCALES SET BY FIELD ENGINEER
FAR COUNT RATE LOW SCALE (CPS): 0
FAR COUNT RATE HIGH SCALE (CPS): 10000
NEAR COUNT RATE LOW SCALE (CPS) '. 0
NEAR COUNT RATE HIGH SCALE (CPS): 24000
TOOL STANDOFF (IN):
REMARKS: This log was depth referenced to a SWS PEX log,
dated 21-Jun-1998
All tie-ins and correlations witnessed by co. rep.
LOGGING PROCEDURE:
Ran in hole with USIT/CNL/GR/CCL combination
Three passes made in 9959'-9242' interval @ 1800 ft/hr,
Jewelry log to 8000'
will not try to tag bottom-Tagged prematurely @ 9847'.
THIS FILE CONTAINS THE RAW CNTG DATA FOR PASS #1.
$
LIS FORMAT DATA
LIS Tape Verification Listing
Schlumberger Alaska Computing Center
17-NOV-1998 13:34
PAGE: 16
** DATA FORMAT SPECIFICATION RECORD **
** SET TYPE- 64EB **
TYPE REPR CODE VALUE
1 66 0
2 66 0
3 73 76
4 66 1
5 66
6 73
7 65
8 68 0.5
9 65 FT
11 66 13
12 68
13 66 0
14 65 FT
15 66 68
16 66 1
0 66 1
** SET TYPE - CHAN **
NAME SERV UNIT SERVICE API API API API FILE NUMB NUMB SIZE REPR PROCESS
ID ORDER # LOG TYPE CLASS MOD NUM~ SAMP ELEM CODE (HEX)
DEPT FT 1239866 O0 000 O0 0 5 1 1 4 68 0000000000
NPHI PS1 PU 1239866 O0 000 O0 0 $ 1 1 4 68 0000000000
ENPH PS1 PU 1239866 O0 000 O0 0 $ 1 1 4 68 0000000000
TNPH PS1 PU 1239866 O0 000 O0 0 5 1 1 4 68 0000000000
TNRA PS1 1239866 O0 000 O0 0 5 1 1 4 68 0000000000
RTNR PS1 1239866 O0 000 O0 0 $ 1 1 4 68 0000000000
ENRA PS1 1239866 O0 000 O0 0 5 1 1 4 68 0000000000
CFEC PS1 CPS 1239866 O0 000 O0 0 5 1 1 4 68 0000000000
CNEC PS1 CPS 1239866 O0 000 O0 0 5 1 i 4 68 0000000000
RCEF PS1 CPS 1239866 O0 000 O0 0 5 1 1 4 68 0000000000
RCEN PS1 CPS 1239866 O0 000 O0 0 $ 1 1 4 68 0000000000
RCNT PS1 CPS 1239866 O0 000 O0 0 5 1 1 4 68 0000000000
RCFT PS1 CPS 1239866 O0 000 O0 0 5 1 1 4 68 0000000000
CNTC PS1 CPS 1239866 O0 000 O0 0 5 1 1 4 68 0000000000
CFTC PS1 CPS 1239866 O0 000 O0 0 $ 1 1 4 68 0000000000
NPOR PS1 PU 1239866 O0 000 O0 0 5 1 1 4 68 0000000000
GR PS1 GAPI 1239866 O0 000 O0 0 $ i 1 4 68 0000000000
TENS PS1 LB 1239866 O0 000 O0 0 $ 1 1 4 68 0000000000
CCL PS1 V 1239866 O0 000 O0 0 5 1 1 4 68 0000000000
** DATA **
LIS Tape Verification Listing
Schlumberger Alaska Computing Center
17-NOV-1998 13:34
PAGE:
17
DEPT. 9842.000 NPHI.PS1
TNRA.PS1 1.848 RTNR.PS1
CNEC. PS1 4178.406 RCEF. PS1
RCFT. PS1 1804.519 CNTC. PS1
GR.PS1 17.008 TENS.PSI
DEPT. 9243.000 NPHI.PS1
TNRA.PS1 4.132 RTNR.PS1
CNEC.PS1 2702.217 RCEF. PS1
RCFT. PS1 288.054 CNTC.PSl
GR.PS1 66.026 TENS.PSI
11.162 ENPH. PS1
1.929 ENRA.PS1
1150.557 RCEN. PS1
3363.569 CFTC. PSI
2282.000 CCL.PS1
49.752 ENPH. PS1
3.588 ENRA.PS1
414.746 RCEN. PS1
1050.591 CFTC. PSi
4407.000 CCL.PS1
20. 648 TNPH. PS1
3.626 CFEC. PS1
3818. 151 RCN~. PS1
1856. 443 NPOR. PS1
1. 311
49.143 TNPH. PS1
6.381 CFEC. PS1
2388.334 RClFT. PS1
276.907 NPOR.PS1
-999.250
14.667
1152.434
3543.819
14.667
44.663
423.475
1120.378
44.063
** END OF DATA **
**** FILE TRAILER ****
FILE NAME : EDIT .005
SERVICE · FLIC
VERSION : O01CO1
DATE ' 98/11/17
MAX REC SIZE : 1024
FILE TYPE : LO
LAST FILE :
**** FILE HEADER ****
FILE NAME : EDIT .006
SERVICE ' FLIC
VERSION · O01CO1
DATE · 98/11/17
MAX REC SIZE : 1024
FILE TYPE : LO
LAST FILE :
FILE HEADER
FILE NUMBER 6
RAW CURVES
Curves and log header data for each pass in separate files; raw background pass in last file
PASS AUJM~ER : 2
DEPTH INCREMENT: 0.5000
FILE SUM~ULgY
VENDOR TOOL CODE START DEPTH STOP DEPTH
CNTG 9844.5 9245.5
$
LOG HEADER DATA
DATE LOGGED: 8 -JUL- 98
LIS Tape Verification Listing
Schlumberger Alaska Computing Center
17-NOV-1998 13:34
PAGE:
18
SOFTWARE VERSION:
TIME LOGGER ON BOTTOM:
TD DRILLER (FT) :
TD LOGGER (FT) :
TOP LOG INTERVAL (FT) :
BOTTOM LOG INTERVAL (FT):
LOGGING SPEED (FPHR) :
DEPTH CONTROL USED (YES/NO):
8Cl-205
1759
9960.0
9847.0
9240.0
9847.0
1800.0
NO
8-JUL~98
TOOL STRING (TOP TO BOTTOM)
VENDOR TOOL CODE TOOL TYPE
GR GAF~_A RAY
CNTG COMP. NEUTRON
$
TOOL NUMBER
SGT-L 53
CNT- G
BOREHOLE AND CASING DATA
OPEN HOLE BIT SIZE (IN) '.
DRILLERS CASING DEPTH (FT) :
LOGGERS CASING DEPTH (FT) :
6.000
9959.0
BOREHOLE CONDITIONS
FLUID TYPE:
FLUID DENSITY (LB/G):
SURFACE TEMPERATURE (DEGF) :
BOTTOM HOLE TEMPERATURE (DEGF):
FLUID SALINITY (PPM) :
FLUID LEVEL (FT) :
FLUID R~TE AT WELLHEAD (BPM) :
WATER CUTS (PCT) :
GAS~OIL RATIO:
CHOKE (DEG) :
Brine
NEUTRON TOOL
TOOL TYPE (EPITHERMAL OR THERMAL):
MATRIX:
MATRIX DENSITY:
HOLE CORRECTION (IN):
THERMAL
SANDSTONE
2.65
BLUELINE COUNT RATE NORMALIZATION IN OIL ZOME
TOP NORMALIZING WINDOW (FT):
BASE NORMALIZING WINDOW (FT):
BLUELINE COUNT RATE SCALES SET BY FIELD ENGINEER
FAR COUNT RATE LOW SCALE (CPS): 0
FAR COUNT RATE HIGH SCALE (CPS): 10000
NEAR COUNT RATE LOW SCALE (CPS): 0
NEAR COUNT RATE HIGH SCALE (CPS): 24000
TOOL STANDOFF (IN):
REMARKS:
This log was depth referenced to a SWS PEX log,
dated 21-Jun-1998
Ail tie-ins and correlations witnessed by co. rep.
LOGGING PROCEDURE:
Ran in hole with USIT/CNL/GR/CCL combination
LIS Tape Verification Listing
Schlumberger Alaska Computing Center
17-NOV-1998 13:34
PAGE:
19
Three passes made in 9959'-9242' interval @ 1800 ft/hr,
Jewelry log to 8000'
will not try to tag bottom-Tagged prematurely @ 9847'.
THIS FILE CONTAINS THE RAW CNTG DATA FOR PASS #2.
$
LIS FORMAT DATA
** DATA FORMAT SPECIFICATION RECORD **
** SET TYPE- 64EB **
TYPE REPR CODE VALUE
1 66 0
2 66 0
3 73 76
4 66 1
5 66
6 73
7 65
8 68 0.5
9 65 FT
11 66 13
12 68
13 66 0
14 65 FT
15 66 68
16 66 1
0 66 1
** SET TYPE - CHAN **
NAME SERV UNIT SERVICE API API API API FILE NUMB NUMB SIZE REPR PROCESS
ID ORDER # LOG TYPE CLASS MOD NUM~ SAMP ELEM CODE (HEX)
DEPT FT 1239866 O0 000 O0 0 6 1 1 4 68 0000000000
NPHI PS2 PU 1239866 O0 000 O0 0 6 1 1 4 68 0000000000
ENPH PS2 PU 1239866 O0 000 O0 0 6 1 1 4 68 0000000000
TNPH PS2 PU 1239866 O0 000 O0 0 6 1 1 4 68 0000000000
TNRA PS2 1239866 O0 000 O0 0 6 1 1 4 68 0000000000
RTNR PS2 1239866 O0 000 O0 0 6 1 1 4 68 0000000000
ENRA PS2 1239866 O0 000 O0 0 6 1 1 4 68 0000000000
CFEC PS2 CPS 1239866 O0 000 O0 0 6 1 1 4 68 0000000000
CNEC PS2 CPS 1239866 O0 000 O0 0 6 1 1 4 68 0000000000
RCEF PS2 CPS 1239866 O0 000 O0 0 6 1 1 4 68 0000000000
RCEN PS2 CPS 1239866 O0 000 O0 0 6 1 1 4 68 0000000000
RCNT PS2 CPS 1239866 O0 000 O0 0 6 1 1 4 68 0000000000
RCFT PS2 CPS 1239866 O0 000 O0 0 6 1 1 4 68 0000000000
CNTC PS2 CPS 1239866 O0 000 O0 0 6 1 1 4 68 0000000000
CFTC PS2 CPS 1239866 O0 000 O0 0 6 1 1 4 68 0000000000
LIS Tape Verification Listing
Schlumberger Alaska Computing Center
17-NOV-1998 13:34
PAGE:
2O
NAME SERV UNIT SERVICE API API API API FILE NUMB AUJAIB SIZE REPR PROCESS
ID ORDER # LOG TYPE CLASS MOD NUMB SAMP ELEM CODE (HEX)
NPOR PS2 PU 1239866 O0 000 O0 0 6 1 1 4 68 0000000000
GR PS2 GAPI 1239866 O0 000 O0 0 6 1 1 4 68 0000000000
TENS PS2 LB 1239866 O0 000 O0 0 6 1 1 4 68 0000000000
CCL PS2 V 1239866 O0 000 O0 0 6 1 1 4 68 0000000000
** DATA **
DEPT. 9844.500 NPHI.PS2 14.129 ENPH. PS2 19.600 TIVPH. PS2
T1FRA.PS2 2.076 RTArR.PS2 2.167 FnVRA.PS2 3.500 CFEC.PS2
CNEC. PS2 3579.828 RCEF. PS2 1021.046 RCEN. PS2 3271.181 RClFT. PS2
RCFT. PS2 1541.644 CNTC. PS2 3233.984 CFTC.PS2 1586.003 NPOR.PS2
GR.PS2 34.016 TENS.PS2 2348.000 CCL.PS2 0.060
DEPT. 9245.000 NPHI.PS2 47.939 ENPH. PS2 47.580 TNPH. PS2
TiVRA.PS2 4.032 RTArR.PS2 4.459 EAFRA.PS2 6.257 CFEC. PS2
CNEC.PS2 2971.990 RCEF. PS2 442.172 RCEN. PS2 2545.518 RClTT. PS2
RCFT. PS2 270.239 CNTC. PS2 1139.613 CFTC. PS2 293.957 NPOR.PS2
GR.PS2 71.155 TENS.PS2 4490.000 CCL. PS2 -999.250
17. 820
1022. 712
3407. 289
17. 820
46.036
474.960
1221.311
45.174
** END OF DATA **
**** FILE TRAILER ****
FILE NAME : EDIT .006
SERVICE : FLIC
VERSION · O01CO1
DATE : 98/11/17
MAX REC SIZE : 1024
FILE TYPE : LO
LAST FILE :
**** FILE HEADER ****
FILE NAME : EDIT .007
SERVICE : FLIC
VERSION : O01CO1
DATE : 98/11/17
MAX REC SIZE : 1024
FILE TYPE : LO
LAST FILE :
FILE HEADER
FILE NUMBER
RAW CURVES
LIS Tape Verification Listing
Schlumberger Alaska Computing Center
17-NOV-1998 13:34 PAGE: 21
Curves and log header data for each pass in separate files; raw background pass in last file
PASS NUMBER: 3
DEPTH INCREMENT: 0.5000
FILE SO2VkqARY
VENDOR TOOL CODE START DEPTH
CNTG 9846.5
$
LOG HEADER DATA
STOP DEPTH
9248.0
DATE LOGGED:
SOFTWARE VERSION:
TIME LOGGER ON BOTTOM:
TD DRILLER (ET):
TD LOGGER (FT) :
TOP LOG INTERVAL (FT) :
BOTTOM LOG INTERVAL (FT) :
LOGGING SPEED (FPHR):
DEPTH CONTROL USED (YES/NO):
8-JUL-98
8Cl-205
1759 8-JOTL-98
9960.0
9847.0
9240.0
9847.0
1800.0
NO
TOOL STRING (TOP TO BOTTOM)
VENDOR TOOL CODE TOOL TYPE
GR GAMMA RAY
CNTG COMP. NEUTRON
$
TOOL NTJMBER
SGT-L 53
CNT-G
BOREHOLE AND CASING DATA
OPEN HOLE BIT SIZE (IN)
DRILLERS CASING DEPTH (FT)
LOGGERS CASING DEPTH (FT)
6. 000
9959.0
BOREHOLE CONDITIONS
FLUID TYPE:
FLUID DENSITY (LB/G):
SURFACE TEMPERATURE (DEGF) :
BOTTOM HOLE TEMPERATURE (DEGF) :
FLUID SALINITY (PPM) :
FLUID LEVEL (FT) :
FLUID RATE AT WELLHEAD (BPM) :
WATER CUTS (PCT) :
GAS~OIL RATIO:
CHOKE (DEG) :
Brine
NEUTRON TOOL
TOOL TYPE (EPITHERMAL OR THERMAL):
MATRIX:
MATRIX DENSITY:
HOLE CORRECTION (IN):
THERMAL
SANDSTONE
2.65
BLUELINE COUNT RATE NORMALIZATION IN OIL ZONE
TOP NORMALIZING WINDOW (FT):
BASE NORMALIZING WINDOW (FT) :
LIS Tape Verification Listing
Schlumberger Alaska Computing Center
17-NOV-1998 13:34
PAGE:
22
BLUELINE COUNT RATE SCALES SET BY FIELD ENGINEER
FAR COUNT RATE LOW SCALE (CPS): 0
FAR COUNT RATE HIGH SCALE (CPS): 10000
NEAR COUNT RATE LOW SCALE (CPS): 0
NEAR COUNT RATE HIGH SCALE (CPS): 24000
TOOL STANDOFF (IN):
REMARKS: This log was depth referenced to a SWS PEX log,
dated 21-Jun-1998
Ail tie-ins and correlations witnessed by co. rep.
LOGGING PROCEDURE:
Ran in hole with USIT/CNL/GR/CCL combination
Three passes made in 9959'-9242' interval @ 1800 ft/hr,
Jewelry log to 8000'
will not try to tag bottom-Tagged prematurely @ 9847'.
THIS FILE CONTAINS THE RAW CNTG DATA FOR PASS #3.
$
LIS FORMAT DATA
** DATA FORMAT SPECIFICATION RECORD **
** SET TYPE - 64EB **
TYPE REPR CODE VALUE
1 66 0
2 66 0
3 73 76
4 66 1
5 66
6 73
7 65
8 68 0.5
9 65 FT
11 66 13
12 68
13 66 0
14 65 FT
15 66 68
16 66 1
0 66 1
** SET TYPE - CHAN **
NAME SERV UNIT SERVICE API API API API FILE NUMB NUMB SIZE REPR PROCESS
ID ORDER # LOG TYPE CLASS MOD NUMB SAMP ELE~f CODE (HEX)
DEPT FT 1239866 O0 000 O0 0 7 1 1 4 68 0000000000
NPHI PS3 PU 1239866 O0 000 O0 0 7 I 1 4 68 0000000000
ENPH PS3 PU 1239866 O0 000 O0 0 7 1 1 4 68 0000000000
LIS Tape Verification Listing
Schlumberger Alaska Computing Center
17-NOV-1998 13:34
PAGE:
23
NAME SERV UNIT SERVICE API API API API FILE NUM~ NUF~ SIZE REPR PROCESS
ID ORDER # LOG TYPE CLASS MOD NUMB SAMP ELEM CODE (HEX)
O0 000 O0 0 7 1 1 4 68 0000000000
TNPH PS3 PU 1239866
TNRA PS3 1239866 O0 000
RTNR PS3 1239866 O0 000
ENRA PS3 1239866 O0 000
CFEC PS3 CPS 1239866 O0 000
CNEC PS3 CPS 1239866 O0 000
RCEF PS3 CPS 1239866 O0 000
RCEN PS3 CPS 1239866 O0 000
RCNTPS3 CPS 1239866 O0 000
RCFT PS3 CPS 1239866 O0 000
CNTC PS3 CPS 1239866 O0 000
CFTC PS3 CPS 1239866 O0 000
NPOR PS3 PU 1239866 O0 000
GR PS3 GAPI 1239866 O0 000
TENS PS3 LB 1239866 O0 000
CCL PS3 V 1239866 O0 000
O0 0 7 i 1 4 68 0000000000
O0 0 7 1 1 4 68 0000000000
O0 0 7 1 1 4 68 0000000000
O0 0 7 1 1 4 68 0000000000
O0 0 7 1 1 4 68 0000000000
O0 0 7 1 1 4 68 0000000000
O0 0 7 1 1 4 68 0000000000
O0 0 7 1 1 4 68 0000000000
O0 0 7 1 1 4 68 0000000000
O0 0 7 1 1 4 68 0000000000
O0 0 7 1 1 4 68 0000000000
O0 0 7 1 1 4 68 0000000000
O0 0 7 1 1 4 68 0000000000
O0 0 7 1 1 4 68 0000000000
O0 0 7 1 1 4 68 0000000000
** DATA **
DEPT. 9846.500 NPHI.PS3 17.885 ENPH. PS3 22.491 TNPH.PS3
TNRA.PS3 2.343 RTNR.PS3 2.444 ENRA.PS3 3.841 CFEC. PS3
CNEC. PS3 3459.585 RCEF. PS3 899.119 RCEN. PS3 3161.306 RCNT. PS3
RCFT. PS3 1159.824 CNTC.PS3 2741.946 CFTC. PS3 1193.197 NPOR.PS3
GR.PS3 28.571 TENS.PS3 2295.000 CCL.PS3 1.269
DEPT. 9247.500 NPHI.PS3 45.338 ENPH. PS3 47.046 TNPH. PS3
TNRA.PS3 3.890 RTNR.PS3 3.673 ENRA.PS3 6.214 CFEC. PS3
CNEC. PS3 2730.800 RCEF. PS3 420.158 RCEN. PS3 2730.793 RCNT. PS3
RCFT. PS3 310.137 CNTC.PS3 1319.449 CFTC. PS3 363.536 NPOR.PS3
GR.PS3 85.129 TENS.PS3 4351.000 CCL. PS3 -999.250
21.505
900.586
2888.883
21.505
41.964
439.428
1110.353
53.710
** END OF DATA **
**** FILE TRAILER ****
FILE NAME : EDIT .007
SERVICE · FLIC
VERSION · O01CO1
DATE . 98/11/17
MAX REC SIZE : 1024
FILE TYPE : LO
LAST FILE :
LIS Tape Ver~'fication Listing
Schlumberger Alaska Computing Center
17-NOV-1998 13:34
PAGE:
24
**** TAPE TRAILER ****
SERVICE NAME : EDIT
DATE : 98/11/17
ORIGIN : FLIC
TAPE NAME : 98595
CONTINUATION # : 1
PREVIOUS TAPE :
COMMENT : BP EXPLORATION, PRUDHOE BAY, N-14A, API# 50-029-20594-01
**** REEL TRAILER ****
SERVICE NAME : EDIT
DATE : 98/11/17
ORIGIN : FLIC
REEL NAME : 98595
CONTINUATION # :
PREVIOUS REEL :
CO~4ENT : BP EXPLORATION, PRUDHOE BAY, N-14A, API# 50-029-20594-01
* ALASKA COMPUTING CENTER
.
* ............................
* ....... SCHLUIVI~ERGER .......
*
COMPANY NAiViE : BP EXPLORATION (ALASKA), INC.
WELL NAM~ : N-14A
FIELD NAME : PRUDHOE BAY
BOROUGH : NORTH SLOPE
STATE : ALASKA
API NUMBER : 500292059401
REFERENCE NO : 98587
M C OF
Date~ [
_ ·
LIS Tape Verification Listing
Schlumberger Alaska Computing Center
16-NOV-1998 15:07
PAGE:
**** REEL HEADER ****
SERVICE NAME : EDIT
DATE : 98/11/16
ORIGIN : FLIC
REEL NAME : 98587
CONTINUATION # :
PREVIOUS REEL :
COM~IENT : BP EXPLORATION, N-14A, PRUDHOE BAY, API #50-029-20594-01
**** TAPE HEADER ****
SERVICE NAME : EDIT
DATE : 98/11/16
ORIGIN : FLIC
TAPE NAME : 98587
CONTINUATION # : 1
PREVIOUS TAPE :
COM~IENT : BP EXPLORATION, N-14A, PRUDHOE BAY, API #50-029-20594-01
TAPE HEADER
PRUDHOE BAY
OPEN HOLE WIRELINE LOGS
WELL NAME:
API NUFiBER :
OPERA TOR:
LOGGING COMPANY:
TAPE CREATION DATE:
JOB DATA
JOB NUMBER:
LOGGING ENGINEER:
OPERATOR WITNESS ..
SURFACE LOCATION
SECTION:
RUN1
98587
MORRISON
STEARNS
TOWNSHIP:
RANGE:
FNL:
FSL :
FEL:
FWL:
ELEVATION (FT FROM MSL O)
KELLY BUSHING:
DERRICK FLOOR:
GROUND LEVEL:
WELL CASING RECORD
1ST STRING
2ND STRING
N-14A
500292059401
BP EXPLORATION (ALASKA), INC.
SCHLUFIBERGER WELL SERVICES
16-NOV-98
RUN 2 RUN 3
8
liN
13E
3917
4731
74.47
43.57
OPEN HOLE CASING DRILLERS
BIT SIZE (IN) SIZE (IN) DEPTH (FT)
6.000 7.000 9406.0
LIS Tape Verification Listing
Schlumberger Alaska Computing Center
16-NOV-1998 15:07
3RD STRING
PRODUCTION STRING
REMARKS:
CONTAINED HEREIN IS THE LDWG FORMATTED OPEN HOLE AIT,
CNT, SDN, DLL, AND BCS DATA AQUIRED ON BP EXPLORATION'S
N-14A WELL. THIS LOG IS THE PRIMARY DEPTH CONTROL FOR
THIS WELL.
$
$
PAGE:
**** FILE HEADER ****
FILE NAME : EDIT .001
SERVICE : FLIC
VERSION : O01CO1
DATE : 98/11/16
MAX REC SIZE : 1024
FILE TYPE : LO
LAST FILE :
FILE HEADER
FILE N7374BER: 1
EDITED OPEN HOLE MAIN PASS
Ail tool strings; Depth shifted and clipped curves; all runs merged; no cased hole data.
DEPTH INCREFiENT: 0.5000
FILE SUMMARY
LDWG TOOL CODE START DEPTH
AIT 9974.0
CNT 9942.0
SDN 9954.0
DLL 9960.0
BCS 9936.0
$
BASELINE CURVE FOR SHIFTS: GR
CURVE SHIFT DATA (MEASURED DEPTH)
BASELINE DEPTH
88888.0
9899.0
9892.0
9832.5
9821.0
9818.0
9795.0
9770.5
9747.0
9723.0
9719.5
9701.0
9690.0
STOP DEPTH
..........
9416.0
9416.0
9416.0
9416.0
9416.0
.......... EQUIVALENT UNSHIFTEDDEPTH ..........
AIT CNT SDN DLL BCS
88888.5
9899.5
9892.0
9832.5
9821.0
9819.0
9796.0
9771.5
9747.0
9724.5
9719.5
9700.0
9690.5
LIS Tape Verification Listing
Schlumberger Alaska Computing Center
16-NOV-1998 15:07
PAGE:
9680.0 9680.5
9669.0 9668.5
9653.0 9653.0
9614.5 9614.5
9584.0 9584.0
9580.5 9580.0
9572.5 9573.0
9570.5 9570.5
9565.5 9566.0
9563.5 9563.0
9552.0 9552.5
9540.0 9541.0
9534.5 9535.0
9533.0 9533.0
9528.5 9530.0
9524.5 9525.0
9522.0 9523.0
9513.5 9514.5
9511.5 9511.5
9497.5 9498.0
9494.0 9495.0
9493.0 9493.5
9479.0 9479.5
9447.0 9446.5
9444.0 9444.0
9436.0 9436.0
9433.5 9434.0
9430.0 9430.5
9428.0 9427.5
9417.0 9416.0
9411.5 9412.0
9398.0 9397.5
9391.5 9390.5
9366.0 9365.5
9361.5 9360.5
9355.5 9355.5
9352.0 9351.5
9340.0 9340.0
9331.5 9330.5
100.0 99.0
$
MERGED DATA SOURCE
LDWG TOOL CODE
$
REMARKS:
RUN NO. PASS NO. 14ERGE TOP MERGE BASE
THIS FILE CONTAINS THE EDITED OPEN HOLE DATA. THE
CURVES HAVE BEEN CLIPPED OF INVALID COUNTS AT FIRST
READING AND AT LASTREADING. PASS 2 IS ON DEPTH WITH
PASS 1 USING THE SHIFTS SHOWN ABOVE.
$
LIS FORMAT DATA
LIS Tape Verification Listing
Schlumberger Alaska Computing Center
16-NOV-1998 15:07
PAGE:
** DATA FORMAT SPECIFICATION RECORD **
** SET TYPE - 64EB **
TYPE REPR CODE VALUE
1 66 0
2 66 0
3 73 124
4 66 1
5 66
6 73
7 65
8 68 0.5
9 65 FT
11 66 8
12 68
13 66 0
14 65 FT
15 66 68
16 66 1
0 66 0
** SET TYPE ~ CHAN **
NAME SERV UNIT SERVICE API API API API FILE ~ NUM~ SIZE REPR PROCESS
ID ORDER # LOG TYPE CLASS MOD NUMB SAMP ELaM CODE (HEX)
DEPT FT O0 000 O0 0 1 1 1 4 68 0000000000
GR AIT GAPI O0 000 O0 0 1 1 1 4 68 0000000000
SP AIT MV O0 000 O0 0 1 1 1 4 68 0000000000
TENS AIT LB O0 000 O0 0 1 1 1 4 68 0000000000
TEND AIT LB O0 000 O0 0 1 1 1 4 68 0000000000
FIRES AIT OHNff~ O0 000 O0 0 1 1 1 4 68 0000000000
MTEMAIT DEGF O0 000 O0 0 1 1 1 4 68 0000000000
DEV AIT DEG O0 000 O0 0 1 1 1 4 68 0000000000
CNTC CNT CPS O0 000 O0 0 1 1 1 4 68 0000000000
CFTC CNT CPS O0 000 O0 0 1 1 1 4 68 0000000000
FCNT CNT CPS O0 000 O0 0 1 1 1 4 68 0000000000
NCNT CNT CPS O0 000 O0 0 1 1 1 4 68 0000000000
CRAT CNT O0 000 O0 0 1 1 1 4 68 0000000000
NRAT CNT O0 000 O0 0 1 1 1 4 68 0000000000
NPHI CNT PU-S O0 000 O0 0 1 1 1 4 68 0000000000
TNPH CNT PU-S O0 000 O0 0 1 1 1 4 68 0000000000
CALI AIT IN O0 000 O0 0 1 1 1 4 68 0000000000
DRHO SDN G/C3 O0 000 O0 0 1 1 1 4 68 0000000000
PEF SDN BN/E O0 000 O0 0 1 1 1 4 68 0000000000
RHOB SDN G/C3 O0 000 O0 0 1 1 1 4 68 0000000000
MSFL SDN OH~4 O0 000 O0 0 1 1 1 4 68 0000000000
MINVSDN OHMM O0 000 O0 0 1 1 1 4 68 0000000000
~INOR SDN OH~4M O0 000 O0 0 1 1 1 4 68 0000000000
AFiO AIT OP~4M O0 000 O0 0 1 1 1 4 68 0000000000
LIS Tape Verification Listing
Schlumberger Alaska Computing Center
16-NOV-1998 15:07
PAGE: 5
NA~E SERV UNIT SERVICE API API API API FILE NDMB NUM~ SIZE REPR PROCESS
ID ORDER # LOG TYPE CLASS MOD NUFiB SAMP ELE~ CODE (HEX)
AF20 AIT OH~ff4 O0 000 O0 0 1 1 1 4 68 0000000000
AF30 AIT OHMM O0 000 O0 0 1 1 1 4 68 0000000000
AF60 AIT OHT4M O0 000 O0 0 1 1 1 4 68 0000000000
AF90 AIT OH~4 O0 000 O0 0 1 1 1 4 68 0000000000
LLD DLL Otff4M O0 000 O0 0 1 1 1 4 68 0000000000
LLM DLL OH~q O0 000 O0 0 1 1 1 4 68 0000000000
DT BCS US/F O0 000 O0 0 1 1 1 4 68 0000000000
** DATA **
DEPT.
TEND.AIT 770
CNTC. CNT -999
CRAT. CNT -999
CALI.AIT -999
MSFL.SDN -999
AF20.AIT -999
LLD.DLL -999
9974 000 GR.AIT -999.250 SP.AIT 35.875 TENS.AIT 4974.000
146 ~!RES.AIT 0.038 MTEM. AIT 191.847 DEV. AIT -999.250
250 CFTC. CNT -999.250 FCNT. CNT -999.250 NCNT. CNT -999.250
250 NRAT. CNT -999.250 NPHI.CNT -999.250 TNPH. CNT -999.250
250 DRHO. SDN -999.250 PEF. SDN -999.250 RHOB.SDN -999.250
250 MINV. SDN -999.250 ~!NOR.SDN -999.250 AFIO.AIT -999.250
250 AF30.AIT -999.250 AF60.AIT -999.250 AF90.AIT -999.250
250 LLM. DLL -999.250 DT. BCS -999.250
DEPT. 9416.000 GR.AIT 73.699 SP.AIT 49.250 TENS.AIT 7103.000
TEND.AIT 1919.602 MRES.AIT 0.041 MTEM. AIT 173.543 DEV. AIT 24.655
CNTC. CNT 1721.316 CFTC. CNT 668.054 FCNT. CNT 597.721 NCNT. CNT 1582.366
CRAT. CNT 2.612 NRAT. CNT 2.688 NPHI.CNT 29.387 TNPH. CNT 28.099
CALI.AIT 8.243 DRHO.SDN 0.120 PEF. SDN 3.185 RHOB. SDN 2.314
MSFL.SDN 1.461 MINV. SDN 0.146 PINOR.SDN 0.246 AFiO.AIT -999.250
AF20.AIT -999.250 AF30.AIT -999.250 AF60.AIT -999.250 AF90.AIT -999.250
LLD.DLL 3.755 LLM. DLL 4.061 DT. BCS 81.172
** END OF DATA **
**** FILE TRAILER ****
FILE NAME : EDIT .001
SERVICE : FLIC
VERSION : O01CO1
DATE : 98/11/16
MAX REC SIZE : 1024
FILE TYPE : LO
LAST FILE :
LIS Tape Verification Listing
Schlumberger Alaska Computing Center
16-NOV-1998 15:07
PAGE:
**** FILE HEADER ****
FILE NAME : EDIT .002
SERVICE : FLIC
VERSION : O01CO1
DATE : 98/11/16
MAX REC SIZE : 1024
FILE TYPE : LO
LAST FILE :
FILE HEADER
FILE NUMBER: 2
EDITED CASED HOLEMAIN PASS
Depth shifted and clipped curves for open hole logs run into casing.
PASS N-UMBER: 1
DEPTH INCREMENT: 0.5000
FILE SUMFLARY
LDWG TOOL CODE
..............
AIT
CNT
$
BASELINE CURVE FOR SHIFTS: GR
CURVE SHIFT DATA (MEASURED DEPTH)
START DEPTH STOP DEPTH
9416.0 7500.0
9416.0 9284.0
BASELINE DEPTH
88888.0
9899.0
9892.0
9832.5
9821.0
9818.0
9795.0
9770.5
9747.0
9723.0
9719.5
9701.0
9690.0
9680.0
9669.0
9653.0
9614.5
9584.0
9580.5
9572.5
9570.5
9565.5
9563.5
9552.0
.......... EQUIVALENT UNSHIFTED DEPTH ..........
AIT CNT
..............
88888.5
9899.5
9892.0
9832.5
9821.0
9819.0
9796.0
9771.5
9747.0
9724.5
9719.5
9700.0
9690.5
9680.5
9668.5
9653.0
9614.5
9584.0
9580.0
9573.0
9570.5
9566.0
9563.0
9552.5
LIS Tape Verification Listing
Schlumberger Alaska Computing Center
16-NOV-1998 15:07
PAGE:
9540.0
9534.5
9533.0
9528.5
9524.5
9522.0
9513.5
9511.5
9497.5
9494.0
9493.0
9479.0
9447.0
9444.0
9436.0
9433.5
9430.0
9428.0
9417.0
9411.5
9398.0
9391.5
9366.0
9361.5
9355.5
9352.0
9340.0
9331.5
100.0
9541.0
9535.0
9533.0
9530.0
9525.0
9523.0
9514.5
9511.5
9498 0
9495 0
9493 5
9479 5
9446 5
9444 0
9436.0
9434.0
9430.5
9427.5
9416.0
9412.0
9397.5
9390.5
9365.5
9360.5
9355.5
9351.5
9340.0
9330.5
99.0
REMARKS: THIS FILE CONTAINS THE EDITED CASED HOLE DATA. THE
CURVES HAVE BEEN CLIPPED OF INVALID COUNTS AT FIRST
AND AT LAST READING. THE SHIFTS SHOWN ABOVE REFLECT
SHIFTING PASS 2 ON DEPTH TO PASS 1.
$
LIS FORMAT DATA
** DATA FORMAT SPECIFICATION RECORD **
** SET TYPE - 64EB **
TYPE REPR CODE VALUE
1 66 0
2 66 0
3 73 52
4 66 1
5 66
6 73
7 65
LIS Tape Verification Listing
Schlumberger Alaska Computing Center
16-NOV-1998 15:07
PAGE:
TYPE REPR CODE VALUE
8 68 0.5
9 65 FT
11 66 19
12 68
13 66 0
14 65 FT
15 66 68
16 66 1
0 66 1
** SET TYPE - CHAN **
NAME SERV UNIT SERVICE API API API API FILE NUFIB NUFIB SIZE REPR PROCESS
ID ORDER # LOG TYPE CLASS MOD AUJM~ SAMP ELE~ CODE (HEX)
O0 000 O0 0 2 1 1 4 68 0000000000
DEPT FT
TENS AIT LB O0 000 O0 0 2 1 1 4 68 0000000000
HTENAIT LB O0 000 O0 0 2 1 1 4 68 0000000000
MTE~AIT DEGF O0 000 O0 0 2 1 1 4 68 0000000000
GRCH AIT GAPI O0 000 O0 0 2 1 1 4 68 0000000000
CNTC CNT CPS O0 000 O0 0 2 1 1 4 68 0000000000
CFTC CNT CPS O0 000 O0 0 2 1 1 4 68 0000000000
RCFT CNT CPS O0 000 O0 0 2 1 1 4 68 0000000000
RCNTCNT CPS O0 000 O0 0 2 1 1 4 68 0000000000
CRAT CNT O0 000 O0 0 2 1 1 4 68 0000000000
NRAT CNT O0 000 O0 0 2 1 1 4 68 0000000000
NPHI CNT PU-S O0 000 O0 0 2 1 1 4 68 0000000000
TNPH CNT PU-S O0 000 O0 0 2 1 1 4 68 0000000000
** DATA **
DEPT. 9416.000 TENS.AIT 5393.000 HTEN. AIT 764.290 MTEM. AIT
GRCH.AIT 68.915 CNTC. CNT 1721.316 CFTC. CNT 668.054 RCFT. CNT
RCNT. CNT 1582.366 CRAT. CNT 2.612 NRAT. CNT 2.688 NPHI.CNT
TNPH. CNT 28.099
DEPT. 9284.000 TENS.AIT -999.250 HTEN. AIT -999.250 MTEM. AIT
GRCH.AIT -999.250 CNTC. CNT 1341.980 CFTC. CNT 383.816 RCFT. CNT
RCNT. CNT 1346.886 CRAT. CNT 3.712 NRAT. CNT 3.795 NPHI.CNT
TNPH. CNT 44.460
186.888
597.721
29.387
-999.250
373.420
41.897
** END OF DATA **
LIS Tape Verification Listing
Schlumberger Alaska Computing Center
16-NOV-1998 15:07
PAGE:
**** FILE TRAILER ****
FILE NAME : EDIT .002
SERVICE : FLIC
VERSION : O01CO1
DATE : 98/11/16
MAX REC SIZE : 1024
FILE TYPE : LO
LAST FILE :
**** FILE HEADER ****
FILE NAME : EDIT .003
SERVICE : FLIC
VERSION : O01CO1
DATE : 98/11/16
MAX REC SIZE : 1024
FILE TYPE : LO
LAST FILE :
RUN NUMBER:
TOOL STRING NUMBER:
PASS NUMBER:
DEPTH INCREMENT:
FILE SU~9~RY
FILE HEADER
FILE NUMBER 3
RAW OPEN HOLEMAIN PASS
Curves and log header data for each run and tool string in separate files; Tool String #1 fo
Sadlerochit run presented first (primary depth control string used to depth shift the Sadler
interval) followed byfiles for other main pass tool strings per run.
1
1
1
0.5000
VENDOR TOOL CODE START DEPTH STOP DEPTH
AIT 9998.0 9416.0
PEX 9998.0 9416.0
BHC 9991.5 9416.0
DLL 9991.5 9416.0
$
LOG HEADER DATA
DATE LOGGED:
SOFTWARE VERSION:
TIME CIRCULATION ENDED:
TIME LOGGER ON BOTTOM:
TD DRILLER (FT) :
TD LOGGER (FT) :
TOP LOG INTERVAL (FT) :
BOTTOM LOG INTERVAL (FT) :
LOGGING SPEED (FPHR) :
TOOL STRING (TOP TO BOTTOM)
VENDOR TOOL CODE TOOL TYPE
21 -JUN-98
8Ct -205
530 21-JUN-98
1330 21 -JUN-98
9960.0
9974.0
7500.0
9974.0
TOOL NUMBER
LIS Tape Verification Listing
Schlumberger Alaska Computing Center
16-NOV-1998 15:07
PAGE:
10
GR
AIT
CNT
SDN
LLD
BHC
$
GAMPIA RAY
ARRAY INDUCTION
COMPENSATED NEUTRON
SONIC DENSITY
AZIMUTH LATERLOG
COMPENSATED SONIC
HGR
AIT-H
HCNT
HRGD 842
HALS-B
DSL T- TCC
BOREHOLE AND CASING DATA
OPEN HOLE BIT SIZE (IN):
DRILLERS CASING DEPTH (FT) :
LOGGERS CASING DEPTH (FT) :
6.000
9406.0
9416.0
BOREHOLE CONDITIONS
MUD TYPE: QUICKDRILL
MUD DENSITY (LB/G): 8.70
MUD VISCOSITY (S) : 60.0
MUD PH: 8.5
FLUID LOSS (C3): 8.0
MAXIMUM RECORDED TE~IPERATURE (DEGF) : 193.0
RESISTIVITY (Oh?4~l) AT TEMPERATURE (DEGF) :
MUD AT M~ASURED TEMPERATURE (MT): 0.118
MUD AT BOTTOM HOLE TEMPERATURE (BHT) :
MUD FILTRATE AT (MT): O. 111
MUD FILTRATE AT (BHT) :
MUD CAKE AT (MT): O. 143
MUD CAKE AT (BHT):
72.0
72.0
72.0
NEUTRON TOOL
TOOL TYPE (EPITHERMAL OR THERMAL): THERMAL
MATRIX: SANDSTONE
MATRIX DENSITY: 2.65
HOLE CORRECTION (IN):
TOOL STANDOFF (IN):
REMARKS: Depth correlated to 7 July 1981 Schlumberger GR log
Standoffs on AIT.
AIT run eccentered and compute standoff mode.
Max Deviation 28.8 deg
Deep laterlog working intermitantly
Main pass has two splices: 9755 and 9540
Spike at 9720 due to tool problems.
Unable to collect data at that point.
THIS FILE CONTAINS THE RAW OPEN HOLE DATA AT 0.5'
SAMPLE RATE.
$
LIS FORMAT DATA
LIS Tape Verification Listing
Schlumberger Alaska Computing Center
16-NOV-1998 15:07
PAGE:
11
** DATA FORMAT SPECIFICATION RECORD **
** SET TYPE - 64EB **
TYPE REPR CODE VALUE
1 66 0
2 66 0
3 73 92
4 66 1
$ 66
6 73
7 65
8 68 0.5
9 65 FT
11 66 11
12 68
13 66 0
14 65 FT
15 66 68
16 66 1
0 66 1
** SET TYPE - CHAN **
NAME SERVUNIT SERVICE API API API API FILE NUMB NUM~ SIZE REPR PROCESS
ID ORDER # LOG TYPE CLASS MOD NUM~ SAMP ELEM CODE (HEX)
DEPT FT O0 000 O0 0 3 1 1 4 68 0000000000
GR AIT GAPI O0 000 O0 0 3 1 1 4 68 0000000000
TENS AIT LB O0 000 O0 0 3 1 1 4 68 0000000000
HTEN AIT LB O0 000 O0 0 3 1 1 4 68 0000000000
MRES AIT OH~4M O0 000 O0 0 3 1 1 4 68 0000000000
MTEMAIT DEGF O0 000 O0 0 3 1 1 4 68 0000000000
GDEVAIT DEG O0 000 O0 0 3 1 1 4 68 0000000000
CNTC PEX CPS O0 000 O0 0 3 1 1 4 68 0000000000
CFTC PEX CPS O0 000 O0 0 3 1 1 4 68 0000000000
RCFT PEX CPS O0 000 O0 0 3 1 1 4 68 0000000000
RCNT PEX CPS O0 000 O0 0 3 1 1 4 68 0000000000
TNRA PEX O0 000 O0 0 3 1 1 4 68 0000000000
RTNR PEX O0 000 O0 0 3 1 1 4 68 0000000000
TNPH PEX PU O0 000 O0 0 3 1 1 4 68 0000000000
NPHI PEX PU-S O0 000 O0 0 3 1 1 4 68 0000000000
NPOR PEX PU O0 000 O0 0 3 1 1 4 68 0000000000
TENS BHC LB O0 000 O0 0 3 1 1 4 68 0000000000
HTEN BHC LB O0 000 O0 0 3 1 1 4 68 0000000000
MRES BHC OH~M O0 000 O0 0 3 1 1 4 68 0000000000
SP BHC MV O0 000 O0 0 3 1 1 4 68 0000000000
GR BHC GAPI O0 000 O0 0 3 1 1 4 68 0000000000
MTEMBHC DEGF O0 000 O0 0 3 1 1 4 68 0000000000
DT BHC US/F O0 000 O0 0 3 1 1 4 68 0000000000
LIS Tape Verification Listing
Schlumberger Alaska Computing Center
16-NOV-1998 15:07
PAGE:
12
** DATA **
DEPT. 9998.000 GR.AIT
~RES.AIT 0.038 MTEM. AIT
CFTC. PEX 1297.415 RCFT. PEX
RTNR.PEX 2.560 TNPH. PEX
TENS.BHC -999.250 HTEN. BHC
GR.BHC -999.250 MTEM. BHC
DEPT. 9416.000 GR.AIT
MRES.AIT 0.041 MT~M. AIT
CFTC. PEX 668.054 RCFT. PEX
RTNR.PEX 2.688 TNPH. PEX
TENS.BHC 5374.000 HTEN. BHC
GR.BHC 74.057 MTEM. BHC
36.920 TENS.AIT
191.847 GDEV. AIT
1175.314 RCNT. PEX
27.833 NPHI.PEX
-999.250 FiRES.BHC
-999.250 DT. BHC
73.699 TENS.AIT
173.543 GDEV. AIT
597.721 RCNT. PEX
28.099 NPHI.PEX
795.020 FIRES.BHC
186.888 DT. BHC
2857.000 HTEN.AIT
-999.250 CNTC. PEX
3021.299 TNRA.PEX
30.155 NPOR.PEX
-999.250 SP. BHC
-999.250
7103.000 HTEN. AIT
24.655 CNTC. PEX
1582.366 TNRA.PEX
28.415 NPOR.PEX
0.039 SP.BHC
83.262
-25.027
3141.032
2.462
27.466
-999.250
1919.602
1721.316
2.612
29.387
53.625
** END OF DATA **
**** FILE TRAILER ****
FILE NAME : EDIT .003
SERVICE : FLIC
VERSION : O01CO1
DATE : 98/11/16
MAX REC SIZE : 1024
FILE TYPE : LO
LAST FILE :
**** FILE HEADER ****
FILE NAME : EDIT .004
SERVICE · FLIC
VERSION : O01CO1
DATE : 98/11/16
MAX REC SIZE : 1024
FILE TYPE : LO
LAST FILE :
FILE HEADER
FILE NUMBER 4
RAW OPEN HOLEMAIN PASS
Curves and log header data for each run and tool string in separate files; Tool String #1 fo
Sadlerochit run presented first (primary depth control string used to depth shift the Sadler
interval) followed by files for other main pass tool strings per run.
RUN NUMBER: 1
TOOL STRING NUMBER: 1
PASS NUMBER: 1
DEPTH INCREMENT: O . 2500
FILE SUFfl~ARY
LIS Tape Verification Listing
Schlumberger Alaska Computing Center
16-NOV-1998 15:07
PAGE:
13
VENDOR TOOL CODE START DEPTH
AIT 9998.0
PEX 9998.0
BHC 9991.5
DLL 9991.5
$
LOG HEADER DATA
DATE LOGGED:
SOFTWARE VERSION:
TIME CIRCULATION ENDED
TIME LOGGER ON BOTTOM:
TD DRILLER (FT) :
TD LOGGER (FT) :
TOP LOG INTERVAL (FT) :
BOTTOM LOG INTERVAL (FT)
LOGGING SPEED (FPHR) :
TOOL STRING (TOP TO BOTTOM)
VENDOR TOOL CODE TOOL TYPE
GR
AIT
CNT
SDN
LLD
BHC
$
GAMMA RAY
ARRAY INDUCTION
COMPENSATED NEUTRON
SONIC DENSITY
AZIMUTH LATERLOG
COMPENSATED SONIC
BOREHOLE AND CASING DATA
OPEN HOLE BIT SIZE (IN):
DRILLERS CASING DEPTH (FT):
LOGGERS CASING DEPTH (FT):
BOREHOLE CONDITIONS
MUD TYPE:
MUD DENSITY (LB/G):
MUD VISCOSITY (S) :
MUD PH :
FLUID LOSS (C3):
MAXIMUM RECORDED TEMPERATURE (DEGF)
RESISTIVITY (OP~4~) AT TEMPERATURE (DEGF)
MUD AT MEASURED TEMPERATURE (MT)
MUD AT BOTTOM HOLE TEMPERATURE (BHT)
MUD FILTRATE AT (MT):
MUD FILTRATE AT (BHT) :
MUD CAKE AT (MT):
MUD CAKE AT (BHT):
NEUTRON TOOL
TOOL TYPE (EPITHERMAL OR THERMAL):
MATRIX:
MATRIX DENSITY:
HOLE CORRECTION (IN):
STOP DEPTH
9416.0
9416.0
9416.0
9416.0
21 -JUN-98
8Cl -205
530 21 -JUN-98
1330 21 -JUN-98
9960.0
9974.0
7500.0
9974.0
TOOL NUM~ER
HGR
AIT-H
HCNT
HRGD 842
HALS - B
DSLT- TCC
6.000
9406.0
9416.0
QUI CKDRILL
8.70
60.0
8.5
8.0
193.0
O. 118 72.0
O. 111 72.0
0.143 72.0
THERMAL
SANDSTONE
2.65
LIS Tape Verification Listing
Schlumberger Alaska Compu ting Center
16-NOV-1998 15:07
PAGE:
14
TOOL STANDOFF (IN):
REMARKS: Depth correlated to 7 July 1981 Schlumberger GR log
Standoffs on AIT.
AIT run eccentered and compute standoff mode.
Max Deviation 28.8 deg
Deep laterlog working intermitantly
Main pass has two splices: 9755 and 9540
Spike at 9720 due to tool problems.
Unable to collect data at that point.
THIS FILE CONTAINS THE RAW OPEN HOLE DATA AT 0.25'
SAMPLE RATE.
$
LIS FORMAT DATA
** DATA FORMAT SPECIFICATION RECORD **
** SET TYPE - 64EB **
TYPE REPR CODE VALUE
1 66 0
2 66 0
3 73 28
4 66 1
5 66
6 73
7 65
8 68 O. 25
9 65 FT
11 66 36
12 68
13 66 0
14 65 FT
15 66 68
16 66 1
0 66 1
** SET TYPE - CHAN **
NAME SERV UNIT SERVICE API API API API FILE NI]M~ NUM~ SIZE REPR PROCESS
ID ORDER # LOG TYPE CLASS MOD NUMB SAMP ELEM CODE (HEX)
DEPT FT O0 000 O0 0 4 1 1 4 68 0000000000
AFiO AIT OHMM O0 000 O0 0 4 1 1 4 68 0000000000
AF20 AIT OHM~ O0 000 O0 0 4 1 1 4 68 0000000000
AF30 AIT OHMM O0 000 O0 0 4 1 1 4 68 0000000000
AF60 AIT OHMM O0 000 O0 0 4 1 1 4 68 0000000000
AF90 AIT OP~4~ O0 000 O0 0 4 1 1 4 68 0000000000
LIS Tape Verification Listing
Schlumberger Alaska Computing Center
16-NOV-1998 15:07
PAGE:
15
NAME SERV UNIT SERVICE API API API API FILE AFIMB NUM~ SIZE REPR PROCESS
ID ORDER # LOG TYPE CLASS MOD NUFIB SAMP ELEM CODE (HEX)
CALI AIT IN O0 000 O0 0 4 1 1 4 68 0000000000
** DATA
DEPT. 9998.000 AFiO.AIT 1950.000 AF20.AIT 6.247 AF30.AIT
AF60.AIT 6.668 AF90.AIT 5.622 CALI.AIT 3.972
5.706
** END OF DATA **
**** FILE TRAILER ****
FILE NAME : EDIT .004
SERVICE · FLIC
VERSION · O01CO1
DATE ' 98/11/16
MAX REC SIZE : 1024
FILE TYPE : LO
LAST FILE :
**** FILE HEADER ****
FILE NAME : EDIT .005
SERVICE : FLIC
VERSION . O01CO1
DATE : 98/11/16
MAX REC SIZE : 1024
FILE TYPE : LO
LAST FILE :
FILE HEADER
FILE NTJM~ER 5
RAW OPEN HOLE MAIN PASS
Curves and log header data for each run and tool string in separate files; Tool String #1 fo
Sadlerochit run presented first (primary depth control string used to depth shift the Sadler
interval) followed by files for other main pass tool strings per run.
RUN NUMBER: 1
TOOL STRING NUMBER: 1
PASS NUMBER: 1
DEPTH INCREMENT: O. 1667
FILE SUMMARY
VENDOR TOOL CODE START DEPTH STOP DEPTH
AIT 9998.0 9416.0
LIS Tape Verification Listing
Schlumberger Alaska Computing Center
16-NOV-1998 15:07
PAGE:
16
PEX
BHC
DLL
$
LOG HEADER DATA
9998.0
9991.5
9991.5
9416.0
9416.0
9416.0
DATE LOGGED:
SOFTWARE VERSION:
TIME CIRCULATION ENDED:
TIME LOGGER ON BOTTOM:
TD DRILLER (FT) :
TD LOGGER (FT) :
TOP LOG INTERVAL (FT) :
BOTTOM LOG INTERVAL (FT) :
LOGGING SPEED (FPHR) :
TOOL STRING (TOP TO BOTTOM)
VENDOR TOOL CODE TOOL TYPE
GR
AIT
CNT
SDN
LLD
BHC
$
GAMFiARAY
ARRAY INDUCTION
COMPENSATED NEUTRON
SONIC DENSITY
AZIMUTH LATERLOG
COMPENSATED SONIC
BOREHOLE AND CASING DATA
OPEN HOLE BIT SIZE (IN):
DRILLERS CASING DEPTH (FT):
LOGGERS CASING DEPTH (FT) :
BOREHOLE CONDITIONS
MUD TYPE:
MUD DENSITY (LB/G):
MUD VISCOSITY (S) :
MUD PH:
FLUID LOSS (C3):
MAXIMUM RECORDED TEMPERATURE (DEGF):
RESISTIVITY (OH~) AT TEMPERATURE (DEGF) :
MUD AT MEASURED TEMPERATURE (MT):
MUD AT BOTTOM HOLE TEMPERATURE (BHT):
MUD FILTRATE AT (FIT):
MUD FILTRATE AT (BHT) :
MUD CAKE AT (MT):
MUD CAKE AT (BHT) :
NEUTRON TOOL
TOOL TYPE (EPITHERMAL OR THERMAL):
MATRIX:
MATRIX DENSITY:
HOLE CORRECTION (IN):
TOOL STANDOFF (IN):
21-JUN-98
8Cl-205
530 21-JUN-98
1330 21-JUN-98
9960.0
9974.0
7500.0
9974.0
TOOL NUFiBER
...........
HGR
AIT-H
HCNT
HRGD 842
HALS-B
DSLT-TCC
6.000
9406.0
9416.0
QUICKDRILL
8.70
60.0
8.5
8.0
193.0
0.118 72.0
O. 111 72.0
0.143 72.0
THERMAL
SANDSTONE
2.65
LIS Tape Verification Listing
Schlumberger Alaska Computing Center
16-NOV-1998 15:07
PAGE:
17
REMARKS: Depth correlated to 7 July 1981 Schlumberger GR log
Standoffs on AIT.
AIT run eccentered and compute standoff mode.
Max Deviation 28.8 deg
Deep laterlog working intermi tantly
Main pass has two splices: 9755 and 9540
Spike at 9720 due to tool problems.
Unable to collect data at that point.
THIS FILE CONTAINS THE RAW OPEN HOLE DATA AT 0.1667'
SAMPLE RATE.
$
LIS FORMAT DATA
** DATA FORMAT SPECIFICATION RECORD **
** SET TYPE - 64EB * *
TYPE REPR CODE VALUE
1 66 0
2 66 0
3 73 88
4 66 1
5 66
6 73
7 65
8 68 0.166
9 65 FT
11 66 11
12 68
13 66 0
14 65 FT
15 66 68
16 66 1
0 66 1
** SET TYPE - CHAN **
NAME SERV UNIT SERVICE API API API API FILE NUMB NUM~ SIZE REPR PROCESS
ID ORDER # LOG TYPE CLASS MOD NUM~ SAMP ELEM CODE (HEX)
DEPT FT O0 000 O0 0 5 1 1 4 68 0000000000
RDRA PEX G/C3 O0 000 O0 0 5 1 1 4 68 0000000000
PEFZ PEX O0 000 O0 0 5 1 1 4 68 0000000000
RHOZ PEX G/C3 O0 000 O0 0 5 1 1 4 68 0000000000
HMIN PEX OH~4~ O0 000 O0 0 5 1 1 4 68 0000000000
H~NO PEX OH~M O0 000 O0 0 5 1 1 4 68 0000000000
RXOZ PEX OHM~ O0 000 O0 0 5 1 1 4 68 0000000000
RX08 PEX OH~ O0 000 O0 0 5 1 1 4 68 0000000000
HCNT PEX CPS O0 000 O0 0 5 1 1 4 68 0000000000
LIS Tape Verification Listing
Schlumberger Alaska Computing Center
16-NOV-1998 15:07
PAGE:
18
NAME SERV UNIT SERVICE API API API API FILE NUM~ NUmB SIZE REPR PROCESS
ID ORDER # LOG TYPE CLASS MOD NUMB SAMP ELEM CODE (HEX)
HCFT PEX CPS O0 000 O0 0 5 1 1 4 68 0000000000
HGR PEX GAPI O0 000 O0 0 5 1 1 4 68 0000000000
RHFT PEX CPS O0 000 O0 0 5 1 1 4 68 0000000000
RHNT PEX CPS O0 000 O0 0 5 1 1 4 68 0000000000
HTNP PEX PU O0 000 O0 0 5 1 1 4 68 0000000000
HNPO PEX PU O0 000 O0 0 5 1 1 4 68 0000000000
LLD HAL 0I~4~ O0 000 O0 0 5 1 1 4 68 0000000000
LLS HAL OHM~ O0 000 O0 0 5 1 1 4 68 0000000000
HGR BHC GAPI O0 000 O0 0 5 1 1 4 68 0000000000
TT1 BHC US O0 000 O0 0 5 1 1 4 68 0000000000
TT2 BHC US O0 000 O0 0 5 1 1 4 68 0000000000
TT3 BHC US O0 000 O0 0 5 1 1 4 68 0000000000
TT4 BHC US O0 000 O0 0 5 1 1 4 68 0000000000
** DATA **
DEPT. 9998.000 HDRA.PEX -999.250 PEFZ.PEX -999.250 RHOZ.PEX
HMIN. PEX 0.306 H~NO.PEX 0.306 RXOZ.PEX 0.374 RXO8.PEX
HCNT. PEX 3141.032 HCFT. PEX 1297.415 HGR.PEX 36.920 RHFT. PEX
RHNT. PEX 3021.299 HTNP. PEX 27.832 HNPO.PEX 27.465 LLD.HAL
LLS.HAL -999.250 HGR.BHC -999.250 TT1.BHC -999.250 TT2.BHC
TT3.BHC -999.250 TT4.BHC -999.250
-999.250
0.380
1175o314
-999.250
-999.250
** END OF DATA **
**** FILE TRAILER ****
FILE NAME : EDIT .005
SERVICE : FLIC
VERSION : O01CO1
DATE : 98/11/16
MAX REC SIZE : 1024
FILE TYPE : LO
LAST FILE :
**** FILE HEADER ****
FILE NAME : EDIT .006
SERVICE : FLIC
VERSION : O01CO1
DATE : 98/11/16
MAX REC SIZE : 1024
FILE TYPE : LO
LAST FILE :
LIS Tape Verification Listing
Schlumberger Alaska Computing Center
16-NOV-1998 15:07 PAGE: 19
FILE HEADER
FILE NUMBER 6
RAW OPEN HOLE MAIN PASS
Curves and log header data for each run and tool string in separate files; Tool String #1 fo
Sadlerochit run presented first (primary depth control string used to depth shift the Sadler
interval) followed by files for other main pass tool strings per run.
RUN NUM~ER: 1
TOOL STRING NUM~ER: 1
PASS NUMBER: 1
DEPTH INCREMENT: 0.0833
FILE SUM~IARY
VENDOR TOOL CODE START DEPTH
AIT 9998.0
PEX 9998.0
BHC 9991.5
DLL 9991.5
$
LOG HEADER DATA
DATE LOGGED:
SOFTWARE VERSION:
TIME CIRCULATION ENDED:
TIME LOGGER ON BOTTOM:
TD DRILLER (FT) :
TD LOGGER (FT) :
TOP LOG INTERVAL (FT) :
BOTTOM LOG INTERVAL (FT) :
LOGGING SPEED (FPHR) :
STOP DEPTH
9416.0
9416.0
9416.0
9416.0
TOOL STRING (TOP TO BOTTOM)
VENDOR TOOL CODE TOOL TYPE
GR
AIT
CNT
SDN
LLD
BHC
$
GAMMA RAY
ARRAY INDUCTION
COMPENSATED NEUTRON
SONIC DENSITY
AZIMUTH LA TERLOG
COMPENSATED SONIC
BOREHOLE AND CASING DATA
OPEN HOLE BIT SIZE (IN):
DRILLERS CASING DEPTH (FT) '.
LOGGERS CASING DEPTH (FT):
BOREHOLE CONDITIONS
MUD TYPE:
MUD DENSITY (LB/G):
MUD VISCOSITY (S) :
MUD PH:
FLUID LOSS (C3):
MAXIMUM RECORDED T~PERATURE (DEGF):
RESISTIVITY (OH~M) AT TEMPERATURE (DEGF) :
21-JUN-98
8Cl-205
530 21-JUN-98
1330 21-JUN-98
9960.0
9974.0
7500.0
9974.0
TOOL NUMBER
HGR
AIT-H
HCNT
HRGD 842
DSLT-TCC
6.000
9406.0
9416.0
QUICKDRILL
8.70
60.0
8.5
8.0
193.0
LIS Tape Verification Listing
Schlumberger Alaska Computing Center
16-NOV-1998 15:07
PAGE:
2O
MUD AT MEASURED TEMPERATURE (MT)
MUD AT BOTTOM HOLE TEMPERATURE (BHT)
MUD FILTRATE AT (MT):
MUD FILTRATE AT (BHT) :
MUD CAKE AT (MT):
MUD CAKE AT (BHT):
0.118
0.111
0.143
72.0
72.0
72.0
NEUTRON TOOL
TOOL TYPE (EPITHERMAL OR THERMAL) :
MATRIX:
MATRIX DENSITY:
HOLE CORRECTION (IN):
THERMAL
SANDSTONE
2.65
TOOL STANDOFF (IN):
REMARKS: Depth correlated to 7 July 1981 Schlumberger GR log
Standoffs on AIT.
AIT run eccentered and compute standoff mode.
Max Deviation 28.8 deg
Deep laterlog working intermitantly
Main pass has two splices: 9755 and 9540
Spike at 9720 due to tool problems.
Unable to collect data at that point.
THIS FILE CONTAINS THE RAW OPEN HOLE DATA AT 0.0833'
SAMPLE RATE.
$
LIS FORMAT DATA
** DATA FORMAT SPECIFICATION RECORD **
** SET TYPE - 64EB **
TYPE REPR CODE VALUE
1 66 0
2 66 0
3 73 8
4 66 1
5 66
6 73
7 65
8 68 0.083
9 65 FT
11 66 128
12 68
13 66 0
14 65 FT
15 66 68
16 66 1
0 66 1
LIS Tape Verification Listing
Schlumberger Alaska Computing Center
16-NOV-1998 15:07
PAGE:
21
** SET TYPE - CHAN **
NAME SERV UNIT SERVICE API API API API FILE NUMB ~ SIZE REPR PROCESS
ID ORDER # LOG TYPE CLASS MOD NUM~ SAMP ELE~ CODE (HEX)
DEPT FT O0 000 O0 0 6 1 1 4 68 0000000000
HCAL PEX IN O0 000 O0 0 6 1 1 4 68 0000000000
** DATA **
DEPT. 9998.000 HCAL.PEX 3.972
** END OF DATA **
**** FILE TRAILER ****
FILE NAME : EDIT .006
SERVICE : FLIC
VERSION : O01CO1
DATE : 98/11/16
MAX REC SIZE : 1024
FILE TYPE : LO
LAST FILE :
**** FILE HEADER ****
FILE NAME : EDIT .007
SERVICE : FLIC
VERSION : O01CO1
DATE : 98/11/16
MAX REC SIZE : 1024
FILE TYPE : LO
LAST FILE :
FILE HEADER
FILE NUMBER 7
RAW OPEN HOLE REPEAT PASSES
Curves and log header data for each pass, tool string, and run in separate files.
RUN NUMBER: 1
TOOL STRING NUM~ER: 1
PASS NUMBER: 1
DEPTH INCREMENT: 0.5000
FILE SUM~ULRY
VENDOR TOOL CODE START DEPTH STOP DEPTH
AIT 10003.0 9680.0
PEX 10003.0 9680.0
LIS Tape Verification Listing
Schlumberger Alaska Computing Center
16-NOV-1998 15:07
PAGE:
22
BHC
DLL
$
LOG HEADER DATA
9587.0
9587.0
9340.0
9340.0
DATE LOGGED:
SOFTWARE VERSION:
TIME CIRCULATION ENDED:
TIME LOGGER ON BOTTOM:
TD DRILLER (FT) :
TD LOGGER (FT) :
TOP LOG INTERVAL (FT):
BOTTOM LOG INTERVAL (FT) :
LOGGING SPEED (FPHR) :
TOOL STRING (TOP TO BOTTOM)
VENDOR TOOL CODE TOOL TYPE
GR
AIT
CNT
SDN
LLD
BHC
$
GAM~LA RAY
ARRAY INDUCTION
COMPENSATED NEUTRON
SONIC DENSITY
AZIMUTH LATERLOG
COMPENSATED SONIC
21-JUN-98
8Cl-205
530 21-JUN-98
1330 21-JUN-98
9960.0
9974.O
7500.0
9974.0
TOOL NUMBER
...........
HGR
AIT-H
HCNT
HRGD 842
HALS-B
DSLT-TCC
BOREHOLE AND CASING DATA
OPEN HOLE BIT SIZE (IN):
DRILLERS CASING DEPTH (FT):
LOGGERS CASING DEPTH (FT):
6.000
9406.0
9416.0
BOREHOLE CONDITIONS
MUD TYPE: QUICKDRILL
MUD DENSITY (LB/G): 8.70
MUD VISCOSITY (S) : 60.0
MUD PH: 8.5
FLUID LOSS (C3): 8.0
MAXIMUM RECORDED TEMPERATURE (DEGF): 193.0
RESISTIVITY (OH~q) AT TEMPERATURE (DEGF):
MUD AT MEASURED T~MPERATURE (MT): O. 118
MUD AT BOTTOM HOLE TEMPERATURE (BHT):
MUD FILTRATE AT (MT): O. 111
MUD FILTRATE AT (BHT):
MUD CAKE AT (MT): O. 143
MUD CAKE AT (BHT) :
72.0
72.0
72.0
NEUTRON TOOL
TOOL TYPE (EPITHERMAL OR THERMAL):
MATRIX:
MATRIX DENSITY:
HOLE CORRECTION (IN):
THERMAL
SANDSTONE
2.65
TOOL STANDOFF (IN):
REMARKS: Depth correlated to 7 July 1981 Schlumberger GR log
LIS Tape Verification Listing
Schlumberger Alaska Computing Center
16-NOV-1998 15:07
PAGE:
23
Standoffs on AIT.
AIT run eccentered and compute standoff mode.
Max Deviation 28.8 deg
Deep laterlog working intermitantly
Main pass has two splices: 9755 and 9540
Spike at 9720 due to tool problems.
Unable to collect data at that point.
THIS FILE CONTAINS THE RAW DATA FOR THE OPEN HOLE REPEAT
DATA COLLECTED AT O. 5 ' SAMPLE RATE.
$
LIS FORMAT DATA
** DATA FORMAT SPECIFICATION RECORD **
** SET TYPE - 64EB **
TYPE REPR CODE VALUE
1 66 0
2 66 0
3 73 96
4 66 1
5 66
6 73
7 65
8 68 0.5
9 65 FT
11 66 10
12 68
13 66 0
14 65 FT
15 66 68
16 66 1
0 66 1
* * SET TYPE - CHAN **
NAME SERV UNIT SERVICE API API API API FILE NUMB NUMB SIZE REPR PROCESS
ID ORDER # LOG TYPE CLASS MOD NUMB SAMP ELEM CODE (HEX)
DEPT FT O0 000 O0 0 7 1 1 4 68 0000000000
GR AIT GAPI O0 000 O0 0 7 1 1 4 68 0000000000
SP AIT MV O0 000 O0 0 7 1 1 4 68 0000000000
TENS AIT LB O0 000 O0 0 7 1 1 4 68 0000000000
HTEN AIT LB O0 000 O0 0 7 1 1 4 68 0000000000
MRES AIT Ot~4M O0 000 O0 0 7 1 1 4 68 0000000000
MTEMAIT DEGF O0 000 O0 0 7 1 1 4 68 0000000000
GDEV AIT DEG O0 000 O0 0 7 1 1 4 68 0000000000
CNTC PEX CPS O0 000 O0 0 7 t 1 4 68 0000000000
CFTC PEX CPS O0 000 O0 0 7 1 1 4 68 0000000000
LIS Tape Verification Listing
Schlumberger Alaska Computing Center
16-NOV-1998 15:07
PAGE:
24
NAME SERVUNIT SERVICE API API API API FILE ArUM~ NUMB SIZE REPR PROCESS
ID ORDER # LOG TYPE CLASS MOD NUM~ SAMP ELEM CODE (HEX)
RCFT PEX CPS O0 000 O0 0 7 1 1 4 68 0000000000
RCNT PEX CPS O0 000 O0 0 7 1 1 4 68 0000000000
TNRA PEX O0 000 O0 0 7 1 1 4 68 0000000000
RTNR PEX O0 000 O0 0 7 1 1 4 68 0000000000
TNPH PEX PU O0 000 O0 0 7 1 1 4 68 0000000000
NPHI PEX PU-S O0 000 O0 0 7 1 1 4 68 0000000000
NPOR PEX PU O0 000 O0 0 7 1 1 4 68 0000000000
TENS BHC LB O0 000 O0 0 7 1 1 4 68 0000000000
HTENBHC LB O0 000 O0 0 7 1 1 4 68 0000000000
M~ES BHC O~ O0 000 O0 0 7 1 1 4 68 0000000000
SP BHC MV O0 000 O0 0 7 1 1 4 68 0000000000
GR BHC GAPI O0 000 O0 0 7 1 1 4 68 0000000000
MTE~BHC DEGF O0 000 O0 0 7 1 1 4 68 0000000000
DT BHC US/F O0 000 O0 0 7 1 1 4 68 0000000000
** DATA **
DEPT. 10003.500 GR.AIT 26.371 SP.AIT 47.188 TENS.AIT
HTEN. AIT -81.935 MRES.AIT 0.038 MTEM.AIT 189.592 GDEV. AIT
CNTC. PEX 3191.883 CFTC. PEX 1596.118 RCFT.PEX 1439.581 RCNT. PEX
TNRA.PEX 2.038 RTNR.PEX 2.119 TNPH. PEX 21.266 NPHI.PEX
NPOR.PEX 20.959 TENS.BHC -999.250 HTEN. BHC -999.250 MRES.BHC
SP.BHC -999.250 GR.BHC -999.250 MTE~.BHC -999.250 DT. BHC
DEPT. 9340.000 GR.AIT -999.250 SP.AIT -999.250 TENS.AIT
HTEN. AIT -999.250 MRES.AIT -999.250 MTEM. AIT -999.250 GDEV. AIT
CNTC. PEX -999.250 CFTC. PEX -999.250 RCFT. PEX -999.250 RCNT. PEX
TNRA.PEX -999.250 RTNR.PEX -999.250 TNPH.PEX -999.250 NPHI. PEX
NPOR.PEX -999.250 TENS.BHC 5295.000 HTEN. BHC 807.033 ~4RES.BHC
SP.BHC 57.938 GR.BHC 91.521 MTEM. BHC 181.056 DT. BHC
3136.000
-999.250
3069.712
22.430
-999.250
-999.250
-999.250
-999.250
-999.250
-999.250
0.040
56.650
** END OF DATA **
**** FILE TRAILER ****
FILE NAME : EDIT .007
SERVICE : FLIC
VERSION · O01CO1
DATE ' 98/11/16
MAX REC SIZE : 1024
FILE TYPE : LO
LAST FILE :
LIS Tape Verification Listing
Schlumberger Alaska Computing Center
·
16-NOV-1998 15:07
PAGE:
25
**** FILE HEADER ****
FILE NAME : EDIT .008
SERVICE : FLIC
VERSION : O01CO1
DATE : 98/11/16
MAX REC SIZE : 1024
FILE TYPE : LO
LAST FILE :
FILE HEADER
FILE N-UM~ER 8
RAW OPEN HOLE REPEAT PASSES
Curves and log header data for each pass, tool string, and run in separate files.
RUN NTJM~ER: 1
TOOL STRING NUMBER: 1
PASS NUMBER: 1
DEPTH INCREMENT: 0.2500
FILE SUMMARY
VENDOR TOOL CODE START DEPTH
AIT 10003.0
PEX 10003.0
BHC 9587.0
DLL 9587.0
$
LOG HEADER DATA
DATE LOGGED:
SOFTWARE VERSION:
TIME CIRCULATION ENDED:
TIME LOGGER ON BOTTOM:
TD DRILLER (FT) :
TD LOGGER (FT) :
TOP LOG INTERVAL (FT) :
BOTTOM LOG INTERVAL (FT) :
LOGGING SPEED (FPHR) :
STOP DEPTH
9680.0
9680.0
9340.0
9340.0
21-JUN-98
8C1-205
530 21-JUN-98
1330 21-JUN-98
9960.0
9974.0
7500.0
9974.0
TOOL STRING (TOP TO BOTTOM)
VENDOR TOOL CODE TOOL TYPE
GR
AIT
CNT
SDN
LLD
BHC
$
GAMMA RAY
ARRAY INDUCTION
COMPENSATED NEUTRON
SONIC DENSITY
AZIMUTH LATERLOG
COMPENSATED SONIC
BOREHOLE AND CASING DATA
OPEN HOLE BIT SIZE (IN):
DRILLERS CASING DEPTH (FT) :
TOOL NUMBER
HGR
AIT-H
HCNT
HRGD 842
HALS-B
DSLT-TCC
6.000
9406.0
LIS Tape Verification Listing
Schlumberger Alaska Computing Center
16-NOV-1998 15:07
PAGE:
26
LOGGERS CASING DEPTH (FT):
9416.0
BOREHOLE CONDITIONS
MUD TYPE: QUICKDRILL
MUD DENSITY (LB/G): 8.70
MUD VISCOSITY (S) : 60.0
MUD PH: 8.5
FLUID LOSS (C3): 8.0
MAXIMUM RECORDED TEMPERATURE (DEGF) : 193.0
RESISTIVITY (OH~ff4) AT TEMPERATURE (DEGF) :
MUD AT MEASURED TEMPERATURE (MT): 0.118
MUD AT BOTTOM HOLE TEMPERATURE (BHT) :
MUD FILTRATE AT (MT): O. 111
MUD FILTRATE AT (BHT) :
MUD CAKE AT (MT): O. 143
MUD CAKE AT (BHT):
72.0
72.0
72.0
NEUTRON TOOL
TOOL TYPE (EPITHERMAL OR THERMAL):
MATRIX:
MATRIX DENSITY:
HOLE CORRECTION (IN):
THERMAL
SANDSTONE
2.65
TOOL STANDOFF (IN):
REMARKS: Depth correlated to 7 July 1981 Schlumberger GR log
Standoffs on AIT.
AIT run eccentered and compute standoff mode.
Max Deviation 28.8 deg
Deep laterlog working intermitantly
Main pass has two splices: 9755 and 9540
Spike at 9720 due to tool problems.
Unable to collect data at that point.
THIS FILE CONTAINS THE RAW DATA FOR THE OPEN HOLEREPEAT
DATA COLLECTED AT 0.25' SAMPLE RATE.
$
LIS FORMAT DATA
** DATA FORMAT SPECIFICATION RECORD **
** SET TYPE - 64EB **
TYPE REPR CODE VALUE
1 66 0
2 66 0
3 73 28
4 66 1
5 66
6 73
7 65
LIS Tape Verification Listing
Schlumberger Alaska Computing Center
16-NOV-1998 15:07
PAGE: 27
TYPE REPR CODE VALUE
8 68 0.25
9 65 FT
11 66 36
12 68
13 66 0
14 65 FT
15 66 68
16 66 1
0 66 1
** SET TYPE - CHAN **
NAFiE SERV UNIT SERVICE API API API API FILE NUM~ NUMB SIZE REPR PROCESS
ID ORDER # LOG TYPE CLASS MOD NUMB SAMP ELEM CODE (HEX)
DEPT FT O0 000 O0 0 8 1 1 4 68 0000000000
AFiO AIT OH~ O0 000 O0 0 8 1 1 4 68 0000000000
AF20 AIT OH~ O0 000 O0 0 8 1 1 4 68 0000000000
AF30 AIT OH~4~ O0 000 O0 0 8 1 1 4 68 0000000000
AF60 AIT OH~M O0 000 O0 0 8 1 1 4 68 0000000000
AF90 AIT OH~ O0 000 O0 0 8 1 1 4 68 0000000000
CALI AIT IN O0 000 O0 0 8 1 1 4 68 0000000000
** DATA **
DEPT. 10003.500 AFIO.AIT 1950.000 AF20.AIT
AF60.AIT 6.616 AF90.AIT 5.505 CALI.AIT
6.538 AF30.AIT
5.491
DEPT. 9680.750 AFiO.AIT 2.999 AF20.AIT 3.084 AF30.AIT
AF60.AIT 3.312 AF90.AIT 3.183 CALI.AIT 5.786
5. 834
3.301
** END OF DATA **
**** FILE TRAILER ****
FILE NAME : EDIT .008
SERVICE : FLIC
VERSION . O01CO1
DATE · 98/11/16
MAX REC SIZE : 1024
FILE TYPE : LO
LAST FILE :
LIS Tape Verification Listing
Schlumberger Alaska Computing Center
16-NOV-1998 15:07
PAGE:
28
**** FILE HEADER ****
FILE NAME : EDIT .009
SERVICE : FLIC
VERSION : O01CO1
DATE · 98/11/16
MAX REC SIZE : 1024
FILE TYPE : LO
LAST FILE :
FILE HEADER
FILE NUMBER 9
RAW OPEN HOLE REPEAT PASSES
Curves and log header data for each pass, tool string, and run in separate files.
RUN NUMBER: 1
TOOL STRING NUMBER: 1
PASS NUMBER: 1
DEPTH INCREMENT: O. 1667
FILE SUFkqARY
VENDOR TOOL CODE START DEPTH
AIT 10003.0
PEX 10003.0
BHC 9587.0
DLL 9587.0
$
LOG HEADER DATA
DATE LOGGED:
SOFTWARE VERSION:
TIME CIRCULATION ENDED:
TIME LOGGER ON BOTTOM:
TD DRILLER (FT) :
TD LOGGER (FT) :
TOP LOG INTERVAL (FT) :
BOTTOM LOG INTERVAL (FT)
LOGGING SPEED (FPHR) :
STOP DEPTH
9680.0
9680.0
9340.0
9340.0
TOOL STRING (TOP TO BOTTOM)
VENDOR TOOL CODE TOOL TYPE
GR GA2BViA RAY
AIT ARRAY INDUCTION
CNT COMPENSATED NEUTRON
SDN SONIC DENSITY
LLD AZIMUTH LA TERLOG
BHC COMPENSATED SONIC
$
BOREHOLE AND CASING DATA
OPEN HOLE BIT SIZE (IN):
DRILLERS CASING DEPTH (FT) :
21 -JUN-98
8Cl -205
530 21 -JUN-98
1330 21 -JUN-98
9960.0
9974.0
7500.0
9974.0
TOOL NUMBER
HGR
AIT-H
HCNT
H~GD 842
HALS-B
DSLT-TCC
6.000
9406.0
LIS Tape Verification Listing
Schlumberger Alaska Computing Center
16-NOV-1998 15:07
PAGE:
29
LOGGERS CASING DEPTH (FT):
9416.0
BOREHOLE CONDITIONS
MUD TYPE: QUICKDRILL
MUD DENSITY (LB/G): 8.70
MUD VISCOSITY (S): 60.0
MUD PH: 8.5
FLUID LOSS (C3): 8.0
MAXIMUM RECORDED TEMPERATURE (DEGF): 193.0
RESISTIVITY (OH~E4) AT TEMPERATURE (DEGF) :
MUD AT MEASURED TEMPERATURE (MT): 0.118
MUD AT BOTTOM HOLE TEMPERATURE (BHT) :
MUD FILTRATE AT (MT): O. 111
MUD FILTRATE AT (BHT) :
MUD CAKE AT (MT): O. 143
MUD CAKE AT (BHT) :
72.0
72.0
72.0
NEUTRON TOOL
TOOL TYPE (EPITHERMAL OR THERMAL):
MATRIX:
MATRIX DENSITY:
HOLE CORRECTION (IN):
THERMAL
SANDSTONE
2.65
TOOL STANDOFF (IN):
REMARKS: Depth correlated to 7 July 1981 Schlumberger GR log
Standoffs on AIT.
AIT run eccentered and compute standoff mode.
Max Deviation 28.8 deg
Deep laterlog working intermitantly
Main pass has two splices: 9755 and 9540
Spike at 9720 due to tool problems.
Unable to collect data at that point.
THIS FILE CONTAINS THE RAW DATA FOR THE OPEN HOLE REPEAT
DATA COLLECTED AT O. 1667 ' SAMPLE RATE.
$
LIS FORMAT DATA
** DATA FORMAT SPECIFICATION RECORD **
** SET TYPE - 64EB **
TYPE REPR CODE VALUE
1 66 0
2 66 0
3 73 88
4 66 1
$ 66
6 73
7 65
LIS Tape Verification Listing
Schlumberger Alaska Computing Center
16-NOV-1998 15:07
PAGE:
30
TYPE REPR CODE VALUE
8 68 0.166
9 65 FT
11 66 11
12 68
13 66 0
14 65 FT
15 66 68
16 66 1
0 66 1
** SET TYPE - CHAN **
NAME SERVUNIT SERVICE API API API API FILE NUMB NUM~ SIZE REPR PROCESS
ID ORDER # LOG TYPE CLASS MOD NUM~ SAMP ELE~f CODE (HEX)
DEPT FT O0 000 O0 0 9 1 1 4 68 0000000000
HDRA PEX G/C3 O0 000 O0 0 9 1 1 4 68 0000000000
PEFZ PEX O0 000 O0 0 9 1 1 4 68 0000000000
RHOZ PEX G/C3 O0 000 O0 0 9 1 1 4 68 0000000000
P~4INPEX OHMM O0 000 O0 0 9 1 1 4 68 0000000000
HFINOPEX OP~V~4 O0 000 O0 0 9 1 1 4 68 0000000000
RXOZ PEX OH~ O0 000 O0 0 9 1 1 4 68 0000000000
RX08 PEX OhlVk4 O0 000 O0 0 9 1 1 4 68 0000000000
HCNT PEX CPS O0 000 O0 0 9 1 1 4 68 0000000000
HCFT PEX CPS O0 000 O0 0 9 1 1 4 68 0000000000
HGR PEX GAPI O0 000 O0 0 9 1 1 4 68 0000000000
RHFT PEX CPS O0 000 O0 0 9 1 1 4 68 0000000000
RHNT PEX CPS O0 000 O0 0 9 1 1 4 68 0000000000
HTNP PEX PU O0 000 O0 0 9 1 1 4 68 0000000000
HNPO PEX PU O0 000 O0 0 9 1 1 4 68 0000000000
LLD HAL OH~ O0 000 O0 0 9 1 1 4 68 0000000000
LLS HAL OP~4~ O0 000 O0 0 9 1 1 4 68 0000000000
HGR BHC GAPI O0 000 O0 0 9 1 1 4 68 0000000000
TT1 BHC US O0 000 O0 0 9 1 1 4 68 0000000000
TT2 BHC US O0 000 O0 0 9 1 1 4 68 0000000000
TT3 BHC US O0 000 O0 0 9 1 1 4 68 0000000000
TT4 BHC US
O0 000 O0 0 9 1 1 4 68 0000000000
** DATA **
DEPT. 10003.500 ~DRA.PEX -999.250 PEFZ.PEX -999.250 RHOZ.PEX
H~IN. PEX 0.354 H~tNO.PEX 0.366 RXOZ. PEX 0.457 RXO8.PEX
HCNT. PEX 3191.883 HCFT. PEX 1596.118 HGR.PEX 26.371 RHFT.PEX
RHNT. PEX 3069.712 HTNP. PEX 21.266 HNPO. PEX 20.959 LLD.HAL
LLS.HAL -999.250 HGR.BHC -999.250 TT1.BHC -999.250 TT2.BHC
TT3.BHC -999.250 TT4.BHC -999.250
-999.250
0.465
1439.581
-999.250
-999.250
LIS Tape Verification Listing
Schlumberger Alaska Computing Center
16-NOV-1998 15:07
PAGE:
31
DEPT. 9340. 334 PiDRA. PEX -999. 250 PEFZ. PEX
HMIN. PEX -999.250 I~4NO. PEX -999.250 RXOZ. PEX
HCNT. PEX -999.250 HCFT. PEX -999.250 HGR. PEX
RHNT. PEX -999.250 HTNP. PEX -999.250 I{NPO.PEX
LLS.HAL 60000. 000 HGR.BHC 87. 723 TT1 .BHC
TT3. BHC 41 O. 938 TT4. BHC 298. 750
- 999.250 RHOZ. PEX
-999. 250 RX08. PEX
-999. 250 RHFT. PEX
-999.250 LLD.HAL
411 . 680 TT2 .BHC
-999.250
-999.250
-999.250
830.536
299.922
** END OF DATA **
**** FILE TRAILER ****
FILE NAM~ : EDIT .009
SERVICE : FLIC
VERSION · O01CO1
DATE : 98/11/16
MAX REC SIZE : 1024
FILE TYPE : LO
LAST FILE :
**** FILE HEADER ****
FILE NAME : EDIT . O10
SERVICE . FLIC
VERSION . O01CO1
DATE : 98/11/16
MAX REC SIZE : 1024
FILE TYPE : LO
LAST FILE :
FILE HEADER
FILE NUMBER 10
RAW OPEN HOLE REPEAT PASSES
Curves and log header data for each pass, tool string, and run in separate files.
RUN N-UMBER: 1
TOOL STRING NUMBER: 1
PASS NUMBER: 1
DEPTH INCREFiENT: 0.0833
FILE SUMMARY
VENDOR TOOL CODE START DEPTH STOP DEPTH
AIT 10003.0 9680.0
PEX 10003.0 9680.0
BHC 9587.0 9340.0
DLL 9587.0 9340.0
$
LOG HEADER DATA
DATE LOGGED:
SOFTWARE VERSION:
21 -JUN-98
8Cl -205
LIS Tape Verification Listing
Schlumberger Alaska Computing Center
16-NOV-1998 15:07
PAGE:
32
TIME CIRCULATION ENDED:
TIME LOGGER ON BOTTOM:
TD DRILLER (FT) :
TD LOGGER (FT) :
TOP LOG INTERVAL (FT) :
BOTTOM LOG INTERVAL (FT) :
LOGGING SPEED (FPHR) :
530 21-JUN-98
1330 21-JUN-98
9960.0
9974.0
7500.0
9974.0
TOOL STRING (TOP TO BOTTOM)
VENDOR TOOL CODE TOOL TYPE
GR
AIT
CNT
SDN
LLD
BHC
$
GAM~A RAY
ARRAY INDUCTION
COMPENSATED NEUTRON
SONIC DENSITY
AZIMUTH LATERLOG
COMPENSATED SONIC
TOOL NUMBER
HGR
AIT-H
HCNT
HRGD 842
HALS-B
DSLT-TCC
BOREHOLE AND CASING DATA
OPEN HOLE BIT SIZE (IN):
DRILLERS CASING DEPTH (FT):
LOGGERS CASING DEPTH (FT) :
6.000
9406.0
9416.0
BOREHOLE CONDITIONS
MUD TYPE: QUICKDRILL
MUD DENSITY (LB/G): 8.70
MUD VISCOSITY (S) : 60.0
MUD PH: 8.5
FLUID LOSS (C3): 8.0
MAXIMUM RECORDED TEMPERATURE (DEGF) : 193.0
RESISTIVITY (OHMS) AT TE~JPERATURE (DEGF):
MUD AT MEASURED TEMPERATURE (MT): 0.118
MUD AT BOTTOM HOLE TEMPERATURE (BHT):
MUD FILTRATE AT (MT): 0.111
MUD FILTRATE AT (BHT) :
MUD CAKE AT (MT): 0.143
MUD CAKE AT (BHT) :
72.0
72.0
72.0
NEUTRON TOOL
TOOL TYPE (EPITHERbIAL OR THERMAL):
MATRIX:
MATRIX DENSITY:
HOLE CORRECTION (IN):
THERMAL
SANDSTONE
2.65
TOOL STANDOFF (IN):
REMARKS:
Depth correlated to 7 July 1981 Schlumberger GR log
Standoffs on AIT.
AIT run eccentered and compute standoff mode.
Max Deviation 28.8 deg
Deep laterlog working intermitantly
Main pass has two splices: 9755 and 9540
Spike at 9720 due to tool problems.
Unable to collect data at that point.
LIS Tape Verification Listing
Schlumberger Alaska Computing Center
16-NOV-1998 15:07
PAGE:
33
THIS FILE CONTAINS THE RAW DATA FOR THE OPEN HOLE REPEAT
DATA COLLECTED AT O. 0833 ' SAMPLE RATE.
$
LIS FORMAT DATA
** DATA FORMAT SPECIFICATION RECORD **
** SET TYPE - 64EB **
TYPE REPR CODE VALUE
1 66 0
2 66 0
3 73 8
4 66 1
5 66
6 73
7 65
8 68 0.083
9 65 FT
11 66 128
12 68
13 66 0
14 65 FT
15 66 68
16 66 1
0 66 1
** SET TYPE - CHAN **
NAME SERV UNIT SERVICE API API API API FILE NUM~ NUM~ SIZE REPR PROCESS
ID ORDER # LOG TYPE CLASS MOD NUMB SAMP ELEM CODE (HEX)
DEPT FT O0 000 O0 0 10 1 1 4 68 0000000000
HCAL PEX IN O0 000 O0 0 10 1 1 4 68 0000000000
** DATA **
DEPT. 10003.500 HCAL.PEX 5.491
DEPT. 9680.584 HCAL.PEX 5.786
** END OF DATA **
LIS Tape Verification Listing
Schlumberger Alaska Computing Center
16-NOV-1998 15:07
PAGE:
34
**** FILE TRAILER ****
FILE NAME : EDIT .010
SERVICE : FLIC
VERSION : O01CO1
DATE : 98/11/16
MAX REC SIZE : 1024
FILE TYPE : LO
LAST FILE :
**** FILE HEADER ****
FILE NAME : EDIT .011
SERVICE · FLIC
VERSION : O01CO1
DATE : 98/11/16
MAX REC SIZE : 1024
FILE TYPE : LO
LAST FILE :
FILE HEADER
FILE NIIMBER 11
RAW CASED HOLE MAIN PASS
Curves and log header data for open hole logs run into casing.
PASS NTJMBER: 1
DEPTH INCREMENT: 0.5000
FILE SUMMARY
VENDOR TOOL CODE START DEPTH STOP DEPTH
AIT 9416.0 7473.0
PEX 9416.0 7473.0
BHC 9416.0 9326.5
$
LOG HEADER DATA
DATE LOGGED: 21 - JUN- 98
SOFTWARE VERSION: 8Cl-205
TIME CIRCULATION ENDED: 530 21-JUN-98
TIME LOGGER ON BOTTOM: 1330 21-JUN-98
TD DRILLER (FT) : 9960.0
TD LOGGER (FT) : 9974.0
TOP LOG INTERVAL (FT) : 7500.0
BOTTOM LOG INTERVAL (FT) : 9974.0
LOGGING SPEED (FPHR) :
TOOL STRING (TOP TO BOTTOM)
VENDOR TOOL CODE TOOL TYPE
GR GAM~A RAY
AIT ARRAY INDUCTION
CNT COMPENSATED NEUTRON
SDN SONIC DENSITY
TOOL NUMBER
HGR
AIT-H
HCNT
HRGD 842
LIS Tape Verification Listing
Schlumberger Alaska Computing Center
16-NOV-1998 15:07
PAGE:
35
LLD AZIMUTH LA TERLOG
BHC COMPENSATED SONIC
$
HALS-B
DSLT- TCC
BOREHOLE AND CASING DATA
OPEN HOLE BIT SIZE (IN):
DRILLERS CASING DEPTH (FT) :
LOGGERS CASING DEPTH (FT) :
6.000
9406.0
9416.0
BOREHOLE CONDITIONS
MUD TYPE: QUI CKDRILL
MUD DENSITY (LB/G): 8.70
MUD VISCOSITY (S) : 60.0
MUD PH: 8.5
FLUID LOSS (C3): 8.0
MAXIMUM RECORDED TEMPERATURE (DEGF): 193.0
RESISTIVITY (OHMS) AT TEMPERATURE (DEGF):
MUD AT MEASURED TEMPERATURE (MT): 0.118
MUD AT BOTTOM HOLE TEMPERATURE (BHT) :
MUD FILTRATE AT (MT): 0.111
MUD FILTRATE AT (BHT) :
MUD CAKE AT (MT): O. 143
MUD CAKE AT (BHT) :
72.0
72.0
72.0
NEUTRON TOOL
TOOL TYPE (EPITHERMAL OR THERMAL):
MATRIX:
MATRIX DENSITY:
HOLE CORRECTION (IN):
THERMAL
SANDSTONE
2.65
TOOL STANDOFF (IN):
REMARKS: Depth correlated to 7 July 1981 Schlumberger GR log
Standoffs on AIT.
AIT run eccentered and compute standoff mode.
Max Deviation 28.8 deg
Deep laterlog working intermitantly
Main pass has two splices: 9755 and 9540
Spike at 9720 due to tool problems.
Unable to collect data at that point.
THIS FILE CONTAINS THE RAW DATA IN CASING AT 0.5'
SAMPLE RATE.
$
LIS FORMAT DATA
LIS Tape Verification Listing
Schlumberger Alaska Computing Center
16-NOV-1998 15:07
PAGE:
36
** DATA FORMAT SPECIFICATION RECORD **
** SET TYPE - 64EB **
TYPE REPR CODE VALUE
1 66 0
2 66 0
3 73 88
4 66 1
5 66
6 73
7 65
8 68 O. 5
9 65 FT
11 66 11
12 68
13 66 0
14 65 FT
15 66 68
16 66 1
0 66 1
** SET TYPE - CHAN **
NAME SERV UNIT SERVICE API API API API FILE NUMB NUMB SIZE REPR PROCESS
ID ORDER # LOG TYPE CLASS MOD NUMB SAMP ELE~ CODE (HEX)
DEPT FT O0 000 O0 0 11 1 1 4 68 0000000000
TENS AIT LB O0 000 O0 0 11 1 1 4 68 0000000000
HTEN AIT LB O0 000 O0 0 11 1 1 4 68 0000000000
MRES AIT Ot{MM O0 000 O0 0 11 1 1 4 68 0000000000
MTEMAIT DEGF O0 000 O0 0 11 1 1 4 68 0000000000
DEVI AIT DEG O0 000 O0 0 11 1 1 4 68 0000000000
GR AIT GAPI O0 000 O0 0 11 1 1 4 68 0000000000
CNTC PEX CPS O0 000 O0 0 11 1 1 4 68 0000000000
CFTC PEX CPS O0 000 O0 0 11 1 1 4 68 0000000000
RCFT PEX CPS O0 000 O0 0 11 1 1 4 68 0000000000
RCNT PEX CPS O0 000 O0 0 11 1 1 4 68 0000000000
CRAT PEX O0 000 O0 0 11 1 1 4 68 0000000000
NRAT PEX O0 000 O0 0 11 1 1 4 68 0000000000
NPOR PEX PU O0 000 O0 0 11 1 1 4 68 0000000000
NPHI PEX PU-S O0 000 O0 0 11 1 1 4 68 0000000000
TNPH PEX PU O0 000 O0 0 11 1 1 4 68 0000000000
TENS BHC LB O0 000 O0 0 11 1 1 4 68 0000000000
HTEN BHC LB O0 000 O0 0 11 1 1 4 68 0000000000
MRES BHC OH~4 O0 000 O0 0 11 1 1 4 68 0000000000
GR BHC GAPI O0 000 O0 0 11 1 1 4 68 0000000000
MTEMBHC DEGF O0 000 O0 0 11 1 1 4 68 0000000000
DT BHC US/F O0 000 O0 0 11 1 1 4 68 0000000000
LIS Tape Verification Listing
Schlumberger Alaska Computing Center
i6-NOV-1998 15:07
PAGE:
37
** DATA **
DEPT. 9416.000 TENS.AIT
MTEM. AIT 173.543 DEVI.AIT
CFTC. PEX 668.054 RCFT. PEX
NRAT. PEX 2.688 NPOR.PEX
TENS.BHC 5374.000 HTEN. BHC
MTEM. BHC 186.888 DT.BHC
DEPT. 7473. 500 TENS.AIT
MTEM. AIT 134. 874 DEVI.AIT
CFTC. PEX 246. 021 RCFT. PEX
NRAT. PEX 4. 840 NPOR. PEX
TENS. BHC -999.250 HTEN. BHC
MTEM. BHC -999.250 DT.BHC
7103. 000 HTEN.AIT
24. 655 GR .AIT
597. 721 RCNT. PEX
29.387 NPHI.PEX
795. 020 I~RES.BHC
83. 262
3790.000 HTEN. AIT
30.468 GR.AIT
243.769 RCNT.PEX
59.813 NPHI.PEX
-999.250 14RES.BHC
-999.250
1919.602 MRES.AIT
73.699 CNTC. PEX
1582.366 CRAT. PEX
28.415 TNPH. PEX
0.039 GR.BHC
786.742 MRES.AIT
169.963 CNTC. PEX
1010.656 CRAT. PEX
60.123 TNPH. PEX
-999.250 GR.BHC
O. 041
1721. 316
2. 612
28. 099
74. 057
0.054
1053.636
4.140
58.718
-999.250
** END OF DATA **
**** FILE TRAILER ****
FILE NAME : EDIT .011
SERVICE : FLIC
VERSION : O01CO1
DATE : 98/11/16
MAX REC SIZE : 1024
FILE TYPE : LO
LAST FILE :
**** TAPE TRAILER ****
SERVICE NAME : EDIT
DATE : 98/11/16
ORIGIN : FLIC
TAPE NAME : 98587
CONTINUATION # : 1
PREVIOUS TAPE :
COM~ENT : BP EXPLORATION, N-14A, PRUDHOE BAY, API #50-029-20594-01
**** REEL TRAILER ****
SERVICE NAME : EDIT
DATE : 98/11/16
ORIGIN : FLIC
REEL NAME : 98587
CONTINUATION # :
PREVIOUS REEL :
COMMENT : BP EXPLORATION, N-14A, PRUDHOE BAY, API #50-029-20594-01