Department of Commerce, Community, and Economic Development
Alaska Oil and Gas Conservation
Commission
HOME
EVENTS
DATA
Data List
Drilling
Production
Orders
Data Miner
Document Search
REPORTS
Reports and Charts
Pool Statistics
FORMS
LINKS
Links
Test Notification
Data Requests
Regulations
Industry Guidance Bulletins
How to Apply
ABOUT US
History
Staff
HELP
Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
184-085
MEMORANDUM State of Alaska Alaska Oil and Gas Conservation Commission DATE:Wednesday, June 12, 2024 SUBJECT:Mechanical Integrity Tests TO: FROM:Adam Earl P.I. Supervisor Petroleum Inspector NON-CONFIDENTIAL ConocoPhillips Alaska, Inc. 2G-07 KUPARUK RIV UNIT 2G-07 Jim Regg InspectorSrc: Reviewed By: P.I. Suprv Comm ________ JBR 06/12/2024 2G-07 50-029-21124-00-00 184-085-0 W SPT 5711 1840850 3000 2350 2350 2350 2350 160 190 190 190 REQVAR P Adam Earl 5/1/2024 Tested as per AIO 2C.038 to MAIP 30 MinPretestInitial15 Min Well Name Type Test Notes: Interval P/F Well Permit Number: Type Inj TVD PTD Test psi API Well Number Inspector Name:KUPARUK RIV UNIT 2G-07 Inspection Date: Tubing OA Packer Depth 920 3310 3180 3160IA 45 Min 60 Min Rel Insp Num: Insp Num:mitAGE240501200410 BBL Pumped:5.4 BBL Returned:5.1 Wednesday, June 12, 2024 Page 1 of 1 9 9 9 9 9 9 9 9 9 9 9 9 9 9 AIO 2C.038 James B. Regg Digitally signed by James B. Regg Date: 2024.06.12 12:26:40 -08'00' MEMORANDUM State of Alaska Alaska Oil and Gas Conservation Commission DATE:Monday, June 13, 2022 SUBJECT:Mechanical Integrity Tests TO: FROM:Adam Earl P.I. Supervisor Petroleum Inspector NON-CONFIDENTIAL ConocoPhillips Alaska, Inc. 2G-07 KUPARUK RIV UNIT 2G-07 Jim Regg InspectorSrc: Reviewed By: P.I. Suprv Comm ________ JBR 06/13/2022 2G-07 50-029-21124-00-00 184-085-0 W SPT 5711 1840850 3000 2300 2300 2300 2300 460 650 650 650 REQVAR P Adam Earl 5/4/2022 MIT IA to max ant. Inj. Psi. per 2C.038 30 MinPretestInitial15 Min Well Name Type Test Notes: Interval P/F Well Permit Number: Type Inj TVD PTD Test psi API Well Number Inspector Name:KUPARUK RIV UNIT 2G-07 Inspection Date: Tubing OA Packer Depth 1130 3290 3150 3130IA 45 Min 60 Min Rel Insp Num: Insp Num:mitAGE220509132425 BBL Pumped:5.3 BBL Returned:5.2 Monday, June 13, 2022 Page 1 of 1 9 9 9 9 99 9 9 9 9 MIT IA 2C.038 James B. Regg Digitally signed by James B. Regg Date: 2022.06.13 14:32:44 -08'00' MEMORANDUM TO: Jim Regg / P.I. Supervisor ' sl , t FROM: Guy Cook Petroleum inspector Well Name KUPARUK RIV UNIT 2G-07 Insp Num: mitGDC200508163531 Rel Insp Num: NON -CONFIDENTIAL State of Alaska Alaska Oil and Gas Conservation Commission DATE: Monday, May 11, 2020 SUBJECT: Mechanical Integrity Tests ConocoPhillips Alaska, Inc. 2G-07 KUPARUK RIV UMT 2G-07 Sre: Inspector Reviewed By: P.I. Supry Comm API Well Number 50-029-21124-00-00 Inspector Name: Guy Cook Permit Number: 184-085-0 Inspection Date: 5/8/2020 ' Packer Depth Pretest Initial 15 Min 30 Min 45 Min 60 Min Well 2G o7 Type Inj w ;TVD 5711 Tubing 2150 -1 2150 - 2160 - 2160 -- � PTD T e Test SPT :Test psi' Type 3000 IA -tOA 360 -_ 3300 - 3185 - 3160 p1840850 BBL Pumped: 7.1 - BBL Returned: 6.6 260 , 300 _ 300 300 - Interval REQVAR 1P/F P Notes: MITIA every 2 years to maximum anticipated injection pressure per AIO 2C.038. Testing performed with a Little Red Services pump truck and calibrated gauges. Monday, May 11, 2020 Page 1 of I MEMORANDUM State of Alaska Depth Alaska Oil and Gas Conservation Commission 2G-07 DATE: Wednesday, April 10, 2019 TO: Jim Regg o �( P.I. Supervisor ��-r/Lt illZ�l y' SUBJECT: Mechanical Integrity Tests ((C CONOCOPHILLIPS ALASKA, INC. PTD 2G-07 FROM: Matt Herrera KUPARUK RIV UNIT 2G-07 Petroleum Inspector ITest psi 3000 IA Src: Inspector 69 -BBL Reviewed By: 69 P.I. Suprv,ITY-- NON -CONFIDENTIAL Comm Well Name KUPARUK RIV UNIT 2G-07 Insp Num: mitMFH190407054149 Rel Insp Num: API Well Number 50-029-21124-00-00 Inspector Name: Matt Herrera Permit Number: 184-085-0 Inspection Date: 4/4/2019 - Pretest Initial 15 Min 30 Min 45 Min 60 Min 1110 -I 1500 1500 3500 - a20 3310 4155 3115 ' 280 - 320 420 320 - Wednesday, April 10, 2019 Page I of 1 Packer Depth Well 2G-07 1Type Inj I W- TVD 5711 Tubing PTD 1840850 Type Testi sPT ITest psi 3000 IA BBL Pumped: 69 -BBL Returned: 69 OA Interval REQVAR P/F P NOtes:MT-IA to maximum anticipated injection psi per AIO 2C.038 Pretest Initial 15 Min 30 Min 45 Min 60 Min 1110 -I 1500 1500 3500 - a20 3310 4155 3115 ' 280 - 320 420 320 - Wednesday, April 10, 2019 Page I of 1 • • • Lau Z4-07 Prh i Set 0650 Ru, James B (DOA) _ From: NSK Well Integrity Supv CPF1 and 2 <n1617@conocophillips.com> s e it 61 fc (i Sent: Wednesday, May 9, 2018 11:20 AM To: Regg,James B (DOA); DOA AOGCC Prudhoe Bay; Brooks, Phoebe L (DOA); Wallace, Chris D (DOA) Subject: Recent SW MITIAs in Kuparuk Attachments: MIT KRU 2B-06 &07 05-07-18.xlsx; MIT KRU 2B-10 NON WITNESSED 05-07-18.xlsx; MIT KRU 2G-01 & 12 05-07-18.xlsx; MIT KRU 2G-05 & 07 NON WITNESSED 05-07-18.xlsx; MIT KRU 2H-01, 03, 13 & 15 05-07-18.xlsx All, State witnessed MITIAs performed in Kuparuk 5-7-18. Regards, Jan Byrne/ Kelly Lyons Well Integrity Supervisor ConocoPhillips Alaska, Inc. Office phone: (907) 659-7224 AZELLS TEAM SCANNfV 1 • • STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMMISSION Mechanical Integrity Test Submit to: jim.reodaalaska.dov' AOGCC.InspectorstBalaska.uov phoebe.brooks alaska.gov chris.wallaceaalaska.aov OPERATOR: ConocoPhillips Alaska Inc, j--&,,i4 5(`x('6 FIELD/UNIT/PAD: Kuparuk/KRU/2G Pad DATE: 05/07/18 OPERATOR REP: Beck/Riley AOGCC REP: Well 2G-05 Pressures: Pretest Initial 15 Min. 30 Min. 45 Min. 60 Min. PTD 1840800 Type Inj N Tubing 2205 2225 2225 2225 Type Test P Packer TVD 5938 BBL Pump 2.6 IA 825 3300 3175 3150 Interval V Test psi 3000 BBL Return 2.5 OA 0 10 10 10 Result P Notes: MITIA to maximum anticipated injection pressure per AIO 2C.029(NON WITNESSED) Well 2G-07 - Pressures: Pretest Initial 15 Min. 30 Min. 45 Min. 60 Min. PTD 1840850 Type Inj N - Tubing 1500 - 1525 ' 1525 - 1525 ' Type Test P Packer TVD 5713 ' BBL Pump 8.5 - IA 295 3300 ' 3210' 3190 ' Interval V Test psi 3000 - BBL Return, 7.4 OA 395 , 425 , 425 - 425 - Result P ✓ Notes: MITIA to maximum anticipated injection pressure per AIO 2C.038 (NON WITNESSED) IA Annular size=3 1/2"x 9 5/8" Well Pressures: Pretest Initial 15 Min. 30 Min. 45 Min. 60 Min. PTD Type Inj Tubing Type Test Packer TVD BBL Pump IA Interval Test psi BBL Return OA Result o es: Well Pressures: Pretest Initial 15 Min. 30 Min. 45 Min. 60 Min. PTD Type Inj Tubing Type Test Packer TVD BBL Pump IA Interval Test psi BBL Return OA Result Notes: Well Pressures: Pretest Initial 15 Min. 30 Min. 45 Min. 60 Min. PTD Type Inj Tubing . Type Test Packer TVD BBL Pump IA Interval Test psi BBL Return OA Result Notes: TYPE INJ Codes TYPE TEST Codes INTERVAL Codes Result Codes W=Water P=Pressure Test I=Initial Test P=Pass G=Gas 0=Other(describe in Notes) 4=Four Year Cycle F=Fail S=Slurry V=Required by Variance I=Inconclusive I=Industrial Wastewater 0=Other(describe in notes) N=Not Injecting Form 10-426(Revised 01/2017) MIT KRU 2G-05 07 NON WITNESSED 05-07-18 • • Wallace, Chris D (DOA) From: NSK Problem Well Supv <n1617@conocophillips.com> Sent: Thursday, July 07, 2016 3:00 PM To: Wallace, Chris D (DOA) Cc: Senden, R.Tyler Subject: Report of IA pressure anomaly 2G-07 (PTD 184-085) 7-7-16 Attachments: 2G-07 90 day TIO 7-7-16.PNG; 2G-07 schematic.pdf Chris, Kuparuk WAG injector 2G-07 (PTD 184-085) is displaying unexplained IA repressurization. The well has been shut in since 6-13-16. During the shut-in period,the IA has been needed to be bled several times when nearing its DNE. At the time of shut in,the well was on gas injection and had been in gas service since July 2015. Therefore the tubing and near wellbore area are gas filled and at this point the apparent TxIA communication is suspected to be caused by a gas-only leak. To confirm the theory, CPAI plans to put the well on water injection for 30 days prior to submitting an AA application. The well is currently shut in to decrease reservoir pressure for an upcoming, nearby CTD sidetrack drilling operation. Therefore there will be a delay in obtaining the 30 day water monitor period. However, if necessary, the well will be put on water injection for a few days to sweep some of the gas away from the near wellbore area to help manage the IA pressure. DHD diagnostics which will include an MIT, drawdown and packoff testing will be performed as soon as possible. Please let me know if you disagree with the plan forward. Kelly Lyons/ Brent Rogers Problem Wells Supervisor ConocoPhillips Alaska, Inc. Desk Phone (907) 659-7224 Mobile Phone (907) 943-0170 SCANNED DEC 0 52016 KUP INJ a 2G-07 ConocoPhillips ; Well Attributes Max Angle&MD TD Alaska Inc Wellbore API/UWI Field Name Wellbore Status ncl('1 MD(ftKB) Act Btm(ftKB) r m„"n.tkpr 500292112400 KUPARUK RIVER UNIT INJ 39.28 4,30000 6,570.0 .-. Comment H2S(ppm) Date Annotation End Date KB-Grd(ft) Rig Release Date 20-07,7/22/2015 5:59:17 PM SSSV:NIPPLE Last WO: 2/1/1993 36.00 7/15/1984 Vertical schematic(actual) Annotation Depth(ftKB) End Date Annotation Last Mod By End Date Last Tag:SLM 6,439.0 7/9/2015 Rev Reason:PERFORATIONS,TAG lehallf 7/22/2015 Casing Strings Casing Description OD(in) ID(in) Top(kKB) Set Depth(ftKB) Set Depth(ND)...Wt/Len 0...Grade Top Thread CONDUCTOR 20 18.936 38.0 105.0 1050 91.50 H-40 WELDED „"„",,,,,,,,,,,",,,,,,,,,,HANGER;33.0ano,eeu,,,,1:L11, Casing Description OD(in) ID(in) Top(ftKB) Set Depth(ftKB) Set Depth(ND)...WtlLen(L.'Grade Top Thread SURFACE 133/8 12.347 37.5 2,178.4 2,178.4 72.00.L-80 BTC rCasing DescriptionOD(in) ID(in) Top(ftKB) Set Depth(kKB) Set Depth(ND)...Wt/Len0.. Grade Top Thread PRODUCTION 95/8 8.681 34.0 6,312.0 6,063.3 47.00 L-80 BTC Casing Description OD(in) ID(in) Top(ftKB) Set Depth(ftKB) Set Depth(ND)...Wt/Len(I...'Grade Top Thread LINER 7 6.276 6,010.0 6,547.5 6,298.2 26.00 J-55 BUTT Tubing Strings Tubing Description String Ma...ID(in) Top(ftKB) Set Depth(ft..JSet Depth(ND)(...Wt(Ib/(t) Grade Top Connection TUBING 3 1/2 2.992 33.0 6,066.11 5,818.3 9.30 J-55 EUE8rdABMOD Completion Details ' Top(ftKB) Top(ND)(CAB) Top Inol I') Item Des Cam Nominal ID (in) 33.0 33.0 0.06 HANGER FMC GEN III TUBING HANGER 3.500 1,721.9 1,721.9 0.52 NIPPLE OTIS X SELECTIVE LANDING NIPPLE 2.813 -AA./CONDUCTOR:39.0-1os.o.A.tYM/. I 5,945.0 5,698.3 8.57 PBR BAKER 80-40 PBR w/10'SEALS 3.000 5,959.3 5,712.5 8.32 PACKER BAKER HB RETRIEVABLE PACKER 4.000 NIPPLE,1,7219 it 6,032.1 5,784.6 7.07 NIPPLE CAMCO D NIPPLE NO GO 2.750 Mk 6,0652 5,817.4 6.52 SOS BAKER SHEAR OUT SUB,ELMD TTL @ 6062'during 2.992 OTIS TEMP LOG on 10/19/84 Perforations&Slots Shot Dens• Top(ND) atm(ND) (shoran Top(ftKB) Bt (ftKB) (ftKB) (ftKB) Zone Date t) Type Com 6,322.0- 6,360.0 6,073.3 6,111.2 A-5,Ate,2G- 7/15/1984 4.0 IPERF 90 deg.Phasing;4” 07 Schlum.Casing SURFACE;37.5-2,178.4 6,411.0 6,418.0 6,162.1 l 6,169.1 A-5,A-4,2G- .7/11/2015 6.0 APERF 60 DEGREE.2.5" 07 Millenium DP charges I Mandrel Inserts St 1 ati GAS LIFT;5,891.2 on Top(ND) Valve Latch Port Size TRO Run N Top(ftKB) (ftKB) Make Model OD(in) Sery Type Type (in) (psi) Run Date Can i 5,891.2 5,645.2 CAMCO MMG-2 1 1/2 GAS LIFT DMY RK 0.000 0.0 2/1/1993 Notes:General&Safety End Date Annotation I`4 10/20/2010 NOTE:View Schematic w/Alaska Schematic9.0 PBR,5,945 0 �• PACKER;5,959.3 WTI., 1 • NIPPLE'.6,032.114 SOS,6,065.2 1 PRODUCTION;34.0-0,312.0 • (PERF;8,322.0.6,380.0 APERF;8,411.0-0,418.0 LINER,6,0100-6,547.5 W i I S2 � _ . � • • lA ac cc a W W W W U — — O O O U o o ui CO w r` G O ✓1 O O O d O Y] Lf1 th u 61 W m M U O O O oU) a U M M M M N N N [V 11.1 w w W o g o o r n n N- t` r- r 0 0 0 —1 L7 C 6 6 tv t`.1 NA N ABap J7 0. "e- fD I I 1 1 I <[! 111 "J' +0 � (� cu 10 7 <o C 4 O E o fD f0 H1 cs F. Qt 3 Z C r; 4 is q 40 to 'i 'Q O D g O Mr Ii- `D A a a: Qt o o O LJ o Cl o t] L]S •• A Cl D o C] CJ LJ CI [] Z Q O Ui 6 ui J U1 O U'i "' " V of Ci C1 C! e- e- ors•.>_on — t T co15d � anow • • MEMORANDUM State of Alaska Alaska Oil and Gas Conservation Commission DATE: Wednesday,May 11,2016 TO: Jim Regg 1) 5IZ'�'(1a P.I.Supervisor �` (' Z SUBJECT: Mechanical Integrity Tests CONOCOPHILLIPS ALASKA INC 2G-07 FROM: Lou Grimaldi KUPARUK RIV UNIT 2G-07 Petroleum Inspector Src: Inspector Reviewed BE: P.I.Suprvs—.64-- NON-CONFIDENTIAL Comm Well Name KUPARUK RIV UNIT 2G-07 API Well Number 50-029-21124-00-00 Inspector Name: Lou Grimaldi Permit Number: 184-085-0 Inspection Date: 5/10/2016 Insp Num: mitLG160510130244 Rel Insp Num: Packer Depth Pretest Initial 15 Min 30 Min 45 Min 60 Min Well r 2G-07 - Type Inj G-TVD 5711 - Tubing I 3775 3780 3800 - 3800 PTD 1840850 ' Type Test SPT Test psi 1500 IA 900 1800 • ' 1745 - 1730 - Interval 'WRIST jP/F P v OA I 320 • 320 - 320 320 . Notes: Pumped 2.0 bbl's diesel,2.0 bbl's returned.All required paperwork available on location.Good test. - SCANNED SEP 2 7 2016 Wednesday,May 11,2016 Page 1 of 1 -2_G‘05 WELL LOG TRANSMITTAL DATA LOGGED /lq/2015 K.BENDER To: Alaska Oil and Gas Conservation Comm. July 22, 2015 Attn.: Makana Bender iv 333 West 7th Avenue, Suite 100 Anchorage, Alaska 99501 Ia U li t 3 V } fi n RE: Perforation Record: 2G-07 Run Date: 7/11/2015 The technical data listed below is being submitted herewith. Please address any problems or concerns to the attention of: Chris Gullett, Halliburton Wireline &Perforating, 6900 Arctic Blvd., Anchorage, AK 99518 FRS_ANC@halliburton.com 2G-07 Digital Data in LAS format, Digital Log Image file 1 CD Rom 50-029-21124-00 SCANNED PLEASE ACKNOWLEDGE RECEIPT BY SIGNING AND RETURNING A COPY OF THE TRANSMITTAL LETTER TO THE ATTENTION OF: Halliburton Wireline &Perforating Attn: Chris Gullett 6900 Arctic Blvd. Anchorage, Alaska 99518 Office: 907-273-3527 Fax: 907-273-3535 FRS_ANC@halliburton.com Date: Signed: )7 ,41a'fr"Li(17) o_ei-ceeet STATE OF ALASKA AL,.—KA OIL AND GAS CONSERVATION COM....SSION REPORT OF SUNDRY WELL OPERATIONS 1.Operations Abandon r Plug Perforations r Fracture Stimulate r Pull Tubing r Operations Shutdown r Performed Suspend r Perforate F Other Stimulate r Alter Casing r Change Approved Program r Rug for Redrill r Perforate New Pool r Repair Well pi— Re-enter Susp Well r Other: r 2.Operator Name. 4.Well Class Before Work 5.Permit to Drill Number: ConocoPhillips Alaska, Inc Development r Exploratory r 184-085 3.Address 6 API Number: Stratigraphic r Service P. O. Box 100360,Anchorage,Alaska 99510 50-029-21124-00 7.Property Designation(Lease Number): 8.Well Name and Number: ADL 25656 KRU 2G-07 9.Logs(List logs and submit electronic and printed data per 20AAC25.071) 10.Field/Pool(s): none Kuparuk River Field/Kuparuk River Oil Pool 11.Present Well Condition Summary: Total Depth measured 6570 feet Plugs(measured) none true vertical 6321 feet Junk(measured) none Effective Depth measured 6465 feet Packer(measured) 5959 true vertical 6215 feet (true vertical) 5712 Casing Length Size MD TVD Burst Collapse CONDUCTOR 67 20 105 105 SURFACE 2142 13.375 2178 2178 PRODUCTION 6278 9.625 6312 6063 LINER 538 7 6548 6298 t? Perforation depth: Measured depth: 6322-6360, 6411-6418 i4 i, E I V D True Vertical Depth: 6073-6111, 6162-6169 SCANNED ''' IJUL 2 8 alb u Tubing(size,grade,MD,and ND) 3.5,J-55,6066 MD, 5818 TVD AOGCC Packers&SSSV(type,MD,and ND) PACKER-BAKER HB RETRIEVABLE PACKER @ 5959 MD and 5712 TVD NIPPLE-OTIS X SELECTIVE LANDING NIPPLE @ 1722 MD and 1722 ND 12.Stimulation or cement squeeze summary: Intervals treated(measured): no stimulation or cement squeeze during this operation Treatment descriptions including volumes used and final pressure: 13. Representative Daily Average Production or Injection Data Oil-Bbl Gas-Mcf Water-Bbl Casing Pressure Tubing Pressure Prior to well operation -- 479 - Subsequent to operation -- 851 14.Attachments(required per 20 AAC 25 070,25 071,&25.283) 15.Well Class after work: Daily Report of Well Operations r Exploratory r Development r Service P' Stratigraphic r Copies of Logs and Surveys Run r 16.Well Status after work: Oil r Gas r WDSPL r Printed and Eectronic Fracture Stimulation Data r GSTOR r WINJ r WAG F GINJ r SUSP r SPLUG r 17.I hereby certify that the foregoing is true and correct to the best of my knowledge. Sundry Number or N/A if C 0 Exempt none Contact John Peirce ( ,265-6471 Email John.W.Peirce(cilconocophillips.com Printed Name John Peirce (a 265-6471 Title Sr. Wells Engineer Signature Phone:265-6471 Date 7/4 (t:151&......... — 7/27/1s Ur- 113115- RBDMSk AUG - 2 2015 ,60 .5-4 )---- Form ?7 fForm 10-404 Revised 5/2015 Submit Original Only ^i-07 WELL WORK SUMMARY DATE SUMMARY 7/9/2015 TAGGED @ 6439' SLM. DRIFTED TBG WITH 10' DUMMY PERF GUN TO 6439' SLM. READY FOR E/L. 7/11/2015 PERFORATE FROM 6411'TO 6418' USING 2.5" HSC, 6 SPF, 60 DEG PHASING, DEEP PENETRATING MILLENNIUM CHARGES. LOG CORRELATED TO SLB CEMENT BOND LOG DATED 13-JUL-1984.CCL STOP DEPTH AT 6403.4'. CCL TO TOP SHOT: 7.6'. JOB COMPLETE KUP INJ 2G-07 ConocoPhillips , Well Attributes Max Angle&MD TD Alaska,Inc. Wellbore APIIt/WI Reid Name Wellbore Status ncl(.) MD(ftKB) Act Btm(ftKB) G....J1dBp 500292112400 KUPARUK RIVER UNIT INJ 39.28 4,300.00 6,570.0 .,s- Comment H2S(ppm) Date Annotation End Date KB-Grd(ft) Rig Release Date 20-07,7/22/20155.5917 PM SSSV:NIPPLE Last WO: 2/1/1993 36.00 7/15/1984 Venial schematic(actual) Annotation Depth(81(8) End Date Annotation Last Mod By End Date Last Tag:SLM 6,439.0 7/9/2015 Rev Reason:PERFORATIONS,TAG lehallt 7/22/2015 ir = C ing Strings Casng Description OD(in) ID(in) Top(NKR) Set Depth MKS) Set Depth(TVD)...Wt/Len(I...Grade Top Thread CONDUCTOR 20 18936 38.0 105.0 105.0 91.50 H-40 WELDED „n,a,,,,,,,,,,,,,,,,,,,,,,,,HANGER,33 0 .Casing Descnphon OD(in) ID(In) Top(ftKB) Set Depth(ftKB) Set Depth(TVD)...Wt/Len(I...Grade Top Thread SURFACE 13 3/8 12.347 37.5 2,178.4 2,178.4 72.00 L-80 BTC Casing Description OD(in) ID(in) Top(ftKB) Set Depth(ftKB) Set Depth(ND)...Wt/Len p...Grade Top Thread PRODUCTION 95/8 8.681 34.0 6,312.0 6,063.3 47.00 L-80 BTC Casing Description OD(in) ID(in) Top(ftKB) Set Depth(ftKB) Set Depth(TVD)...Wt/Len(I...Grade Top Thread LINER 7 6.276 6,010.0 6,547.5 6,298.2 26.00 J-55 BUTT Tubing Strings Tubing Description String Ma...ID(in) Top(MKS) Set Depth(R..Set Depth(ND)(...Wt(Ib/ft) Grade Top Connection TUBING 1 3 1/21 2.9921 33.01 6,066.11 5,818.31 9.301 3-55 I EUE8rdABMOD Completion Details Nominal ID Top(ftKB) Top(ND)(ftKB) Top Incl I) Item Des Corn On/ 33.0 33.0 0.06 HANGER FMC GEN III TUBING HANGER 3.500 1,721.9 1,721.9 0.52 NIPPLE OTIS X SELECTIVE LANDING NIPPLE 2.813 MP CONDUCTOR,38.0-1050 - - 5,945.0 5,698.3 8.57 PBR BAKER 80-40 PBR w/10'SEALS 3.000 5,959.3 5,712.5 8.32 PACKER BAKER HB RETRIEVABLE PACKER 4.000 NIPPLE;1,721.9 SW 6,032.1 5,784.6 7.07 NIPPLE CAMCO D NIPPLE NO GO 2.750 IR 6,065.2 5,817.4 6.52 SOS BAKER SHEAR OUT SUB,ELMD TTL @ 6062'during I 2.992 OTIS TEMP LOG on 10/19/84 Perforations&Slots Shot Dens Top(ND) Btm(ND) (shots/f Top(ftKB) Btm(ftKB) (ftKB) (ftKB) Zone Date t) Type Com 6,322.0 6,360.0 6,073.3 6,111.2 A-5,A-4,2G- 7/15/1984 4.0 (PERF 90 deg.Phasing;4" 07 Schlum.Casing SURFACE;37.5-2,17t.4.--ak Ak 6,411.0 6,418.0 6,162.1 6,169.1 A-5,A-4,2G- 7/11/2015 6.0 APERF 60 DEGREE.2.5" 07 Millenium DP charges Mandrel Inserts St 0nl GAS LIFT;5,891.2 Top(ND) Valve Latch Port Size TRO Run N Top(ftKB) (ftKB) Make Model OD(in) Sery Type Type (in) (psi) Run Date Corn 1' 5,891.2 5,645.2 CAMCO 'MMG-2 11/2 GAS LIFT DMY RK 0.000 0.0 2/1/1993 Notes:General&Safety End Date Annotation 10/20/2010 NOTE:View Schematic w/Alaska Schematic9.0 PBR;5,945.0 PACKER;5,959.3 NIPPLE;6,032.1 I SOS,6,065.2 11 PRODUCTION;34.0.6,312.0 IPERF;6.322.0-6.360.0 - - APERF;6,411.0.6,418.0 - --. 1 , I 1 LINER;6,010.0.6,547.0 1. Imag~ ect Well History File Cover e XHVZE This page identifies those items that were not scanned during the initial production scanning phase. They are available in the original file, may be scanned during a special rescan activity or are viewable by direct inspection of the file. I ~ ~- C .~,~ Well History File Identifier RESCAN DIGITAL DATA OVERSIZED (Scannable) [] Color items: [] Diskettes, No. [] Maps: [] G_.r.~/~cale items: [] Other, No~ype [] Other items scannable by large scanner ~Poor Quality Originals: OVERSIZED (Non-Scannable) [] Other: O Logs of various kinds NOTES: [] Other BY: BEVERLY ROBIN VINCENT SHERYL MARIA WINDY Project Proofing DATE: F~JfT/'~ Scanning Preparation .~:~' x 30 = ~ + ~ = TOTAL PAGES BY: BEVERLY(~NCENT SHERYL MARIA WINDY Production Scanning Stage 1 PAGE COUNT FROM SCANNED FILE: PAGE COUNT MATCHES NUMBER IN SCANNING PREPARATION: ~ YES Stage 2 IF NO IN STAGE '1, PAGE(S) DISCREPANCIES WERE FOUND: YES BY: BEVERLY ROBIN VINC~~IARIA WINDY (SCANNING IS COMPLETE AT THIS POINT UNLE~ SPECIAL ATTENTION IS REQUIRED ON AN INDIVIDUAL PAGE BASIS DUE TO QUALITY, GRAySCALE OR COLOR IMAGES) ReScanned (individua! page [special at~et~tto~] .~cat;ning completed) NO NO III IIIIIIIIIII IIIII RESCANNEDBY: BEVERLY ROBIN VINCENT SHERYL MARIA WINDY DATE: Is~ General Notes or Comments about this file: Quality Checked 12/10/02Rev3NOTSCanned.wpd STATE OF ALASKA • ALIPKA OIL AND GAS CONSERVATION COMOSION REPORT OF SUNDRY WELL OPERATIONS 1.Operations Performed: Abandon r Repair w ell r Rug Perforations r Perforate r Other Cold tap conductor Alter Casing r Pull Tubing r Stimulate- Frac r Waiver r Time Extension r Change Approved Program rOperat. Shutdown r Stimulate-Other r Re-enter Suspended Well r 2.Operator Name: 4.Well Class Before Work: 5.Permit to Drill Number: ConocoPhillips Alaska, Inc. Development r Exploratory r 184-085 • 3.Address: 6.API Number: P. O. Box 100360,Anchorage,Alaska 99510 Stratigraphic r Service 50-029-21124-00 • 7.Property Designation(Lease Number): 8.Well Name and Number: ADL0025656 • 2G-07 . 9.Logs(List logs and submit electronic and printed data per 20AAC25.071): 10.Field/Pool(s): NA Kuparuk River Field/Kuparuk River Oil Pool • 11.Present Well Condition Summary: Total Depth measured 6570 feet Plugs(measured) None true vertical 6321 feet Junk(measured) None Effective Depth measured 0 feet Packer(measured) 5959 true vertical 0 feet . (true vertical) 5712 Casing Length Size MD TVD Burst Collapse CONDUCTOR 67 20 105 0 0 0 SURFACE 2142 13.375 2178 0 0 0 PRODUCTION 6278 9.625 6312 0 0 0 c� NOV 14 2.013 3 \z1 Perforation depth: Measured depth: 6332-6360NHE True Vertical Depth: 6073-6111 S EP 16 2Q1:°: AOUCC Tubing(size,grade,MD,and ND) 3.5, J-55,6065 MD,5817 TVD Packers&SSSV(type,MD,and ND) PACKER-BAKER HB RETRIEVABLE PACKER @ 5959 MD and 5712 TVD 12.Stimulation or cement squeeze summary:N/A Intervals treated(measured): Treatment descriptions including volumes used and final pressure: 13. Representative Daily Average Production or Injection Data Oil-Bbl Gas-Mcf Water-Bbl Casing Pressure Tubing Pressure Prior to well operation N/A N/A N/A N/A N/A Subsequent to operation N/A N/A N/A N/A N/A 14.Attachments 15.Well Class after work: Copies of Logs and Surveys run Exploratory r Development r Service F • Stratigraphic r 16.Well Status after work: Oil r Gas r WDSPL r Daily Report of Well Operations X GSTOR r WINJ r WAG • GINJ r SUSP r SPLUG r 17.I hereby certify that the foregoing is true and correct to the best of my knowledge. Sundry Number or N/A if C.O.Exempt: N/A Contact Martin Walters/MJ Loveland Email n1878Ca cop.com Printed Name Martin Walters Title Well Integrity Project Supervisor Signature �/'�f,4_�a �� Phone:659 7043 Date:9/10/13 L- F 10 1/°//3 RBDMS SEP 18 7 ,.._..\_ Form 10-404 Revised 10/2012 Submit Original Only • • RECEIVED N EP 162013 ConocoPhillips Alaska AOGCC P.O. BOX 100360 ANCHORAGE,ALASKA 99510-0360 September 10, 2013 Commissioner Dan Seamount Alaska Oil and Gas Conservation Commission 333 West 7th Avenue, Suite 100 Anchorage, AK 99501 Commissioner Seamount: Enclosed please find the 10-404 Report of Sundry Operations for ConocoPhillips Alaska, Inc.,well 2G-07, PTD 184-085, conductor cold tap. Please call MJ Loveland or Martin Walters at 659-7043 if you have any questions. Sincerely, /17(R/ 4/& Martin Walters ConocoPhillips Well Integrity Projects Supervisor • • Name of Recipient Page 2 of 2 09/10/13 • • • 2G-07 DESCRIPTION OF WORK COMPLETED SUMMARY Date Event Summary 07/10113 Received clarification from Chris Wallace that a 10-403 is not necessary to weld on a thread-o- let and hot tap the conductor. We will be required to submit a 10-404. Similar to a starter head weld. 09/07/13 Initial T/I/O=S1/150/0. Determined that OA pressure is 0 PSI. Installed frame portion of tool around conductor. Installed drill portion of tool. Performed a 30 min pressure test on tool itself @ 500 PSI. 30 min= 500 PSI. Using a 3/4" drill bit, drilled in 3/4" into conductor. Had no pressure inside conductor. Rigged down cold tap tool and tapped 3/4" hole. Installed 1/2" adaptor with 1/2" ball valve and gauge. Final TWO= SI/150/0. • 4. i ' F , . ,.., ...... .., ,,... ,. „ $ ,,$,,,, ,„,...„ .......,, ,.. .„...... t..,.„ $ ,..,...„ , $,i,,. ,, .$:$$;,..,,,,, , cz$ ..„,.,si,,,, 7 t .'; 4 i. if I C 7 j� T a .. t .. ro r �',, '"M U u.., .fix VO C1 G ..0 ,. " `' M1 . , co c CI_ F—,' 0 C 'co Q c2. II) MEMORANDUM To: Jim Regg ~ ~~`,~1r,; P.I. Supervisor ~~~' FROM: John Crisp Petroleum Inspector State of Alaska Alaska Oil and Gas Conservation Commission DATE: Wednesday, May 07, 2008 SUBJECT: Mechanical Inteb ~ity Tests CONOCOPFIILLIPS ALASKA INC zG-07 KUPARUK RIV UtiIT 2G-07 Src: Inspector NON-CONFIDENTIAL Reviewed By: P.I. Suprv ~= Comm Well Name: KUPARUK RN UNIT 2G-07 API Well Number: 50-029-21124-00-00 Inspector Name: .Iohn Crisp Insp Nnm: mitJCr080504044 t 32 Permit Number: 184-085-0 Inspection Date: 5?212008 Rel Insp Num: Packer Depth Pretest Initial 15 NTin. 30 Min. 45 Min. 60 Min. Well , zG o7,Type Inj. G ! TVD j s717 ~ ~ IA tz6o ! zaso ~i zaoo z39o --- ~~ ---- ~OA ~ goo zzo ~-- ~- - - -- ~ P.T. ~ T eTest ~ ~ +- Intervalaaos~o YP P sPT Test s~ ~aoo ~ g ~ zzo 1 zzo __ ______ -I _- ~- _ -- p - -- _- 4YRTST P TUbin 3650 3650 3650 360 ', NOteS• 2.8 bbl's pumped for test. 1J Wednesday, N(ay 07, 2008 Page 1 of I MEMORANDUM State of Alaska Alaska Oil and Gas Conservation Commission "..---., I TO: Jim Regg ki¥ 7 J~/C't P.I. Supervisor I ') ( ( DATE: Wednesday. June .30, 200~ SUBJECT: t\.lechamcallntegrlt) Tests CONOCOPH1LLlPS AL.o\Sl\..o\ []\IC ~G-O: FROM: JCr", sc. Petrol~um Inspector KUPARUK RIV UNlT ~G-(i7 Src: Inspector Reviewed B)': PJ. Supr{íßR Comm NON-CONFIDENTIAL \Vell Name: KUPARUK RlV UNIT 2G-07 Insp Num: mitJCrO~0628185059 Rellnsp Num: API Well Number: 50-029-21124-00-00 Permit Number: 184-085-0 Inspector Name: JCr Inspection Date: 6/27/~004 Packer Depth Pretest Initial 15 Min. 30 Min. 45 Min. 60 Min. \Vell ~G-07 Type Inj. S TVD 6320 IA 1..\80 2990 29-10 2930 P.T. 18..\0850 T~'peTest SPT Test psi 1..\8..\ 5 OA 100 \00 100 100 Interval WRTST PIF P Tubing 2..\00 2..\00 2..\00 2..\00 Notes: Wedne5da). June .30. 2004 Page I of I ARCO Alaska, Inc. ~ Post Office B~.~... ,,00360 Anchorage, Alaska 99510-0360 Telephone 907 276 1215 August 13, 1993 Mr. David W. Johnston, Chairman Alaska Oil and Gas Conservation Commission 3001 Porcupine Drive Anchorage, Alaska 99501 Dear Mr. Johnston' Attached in duplicate are multiple Report of Sundry Well Operations (Form 10-404) notices in the Kuparuk field. The wells are listed below. WELL ACTION 2G-07 Other If you have any questions, please call me at 263-4241. Sincerely, P. S. White Sr. Engineer Kuparuk Petroleum Engineering RECEIVED A U6 7 8 1998 Alaska Oil & (]as Cons. Commission Anchorage ARCO Alaska, Inc. is a Subsidiary of AtlanticRichfieldCompany Ali;c?, (~; .~'-'"' . STATE OF ALASKA ~ A~,.,,,A OIL AND GAS CONSERVATION COMML~o/ON REPORT OF SUNDRY WELL OPERATIONS Stimulate __ Plugging Perforate _ Repair well Other 1. Operations Performed' Operation Shutdown Pull tubing Alter casing 2. Name of Operator ARCO Alaska, Inc. 3. Address P. O. Box 100360, Anchorage, AK 99510 5. Type of Well: Development _ Exploratory _ Stratigraphic _ Service 4. Location of well at surface 487' FSL, 236' FWL, SEC. 32, T11N, R9E, UM At top of productive interval 1091' FSL, 1187' FWL, SEC. 32, T11N, R9E, UM At effective depth 1093' FSL, 1189' FWL, SEC. 32, T1 1N, R9E, UM At total depth 1097' FSL, 1194' FWL, SEC. 32, T1 1N, R9E, UM 12. Present well condition summary Total Depth: measured 6570' feet true vertical 6320' feet Effective depth' Casing Structural Conductor Surface Intermediate Production Liner Perforation depth: measured 6465' feet true vertical 6215' feet Length Size 105' 20" 2178' 13 3/8" 63 t2' 9 5/8" 537' 7" measured 6322'- 6340', 6340' - 6360' Plugs (measured) NONE Junk (measured) NONE Cemented 278 SX cs II 1000 SX PF "E" & 450 SX PF "C" 850 SX CLASS G & 250 SX CLASS G 6. Datum elevation (DF or KB) 140' RKB 7. Unit or Property name Kuparuk River Unit 8. Well number ;~G-07 9. Permit number/,/2ppr'o 04- 8 5 ,c~,._~ 10. APl number 50-029-2112400 11. Field/Pool Kuparuk River Field Kuparuk River Oil Pool Measured depth True vertical depth 105'MD 105' TVD 2178' MD 2178' TVD 6312' MD 6062' TVD 6010' -6547' MD 5762'-6283' TVD feet true vertical 6072' - 6090', 6090' - 6110' Tubing (size, grade, and measured depth) 3 1/2", 9.3#, J-55 TUBING @ 6066' Packers and SSSV (type and measured depth) OTIS MCX Injection Valve SSSV @1722", Baker HB PACKER @5959' 13. Stimulation or cement squeeze summary Intervals treated (measured) Treatment description including volumes used and final pressure RECEIVED AU G I b ,995 Alaska 0il & Gas Cons. Anchorage 14. Prior to well operation Subsequent to operation Representative Daily Average, Production or Injection Data OiI-Bbl Gas-Md Water-Bbl Casing Pressure 200O 1200 3OO0 2OOO TubingPressure 2700 3900 15. Attachments Copies of Logs and Surveys run Daily Report of Well Operations 16. Status of well classification as: Water Injector WAG INJECTOR Oil _ Gas Suspended Service 17. I hereby certify that the foregoing is true and correct to the best of my knowledge. Form 10-404 Rev 06/15/88 SUBMIT IN DUPLICATE WAG INJECTION WELL 2G~07 INJECTION VALVE WAIVER-- FORM 10-404 Otis MCX injection valve was run following workover as stated in application. RECEIVED A tJ G 1 ~ 199~ Alaska 0il & t~as Oons. Oomm~ss\or~ Anchorage STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMMISSION REPORT OF SUNDRY WELL OPERATIONS Stimulate Plugging Perforate 1. Operations performed: Operation ShUtdown Pull tubing x Alter casing Repair well X Other 2. Name of Operator ARCO Alaska, Inc. 3. Address P. O. Box 100360, Anchorage, AK 99510 5. Type of Well: Development Exploratory Stratigraphic Service 4. Location of well at surface 487' FSL, 236' FWL, SEC 32, T11N, RgE, UM At top of productive interval 1091' FSL, 1187' FWL, SEC 32, T11N, RgE, UM At effective depth 1093' FSL, 1189' FWL, SEC 32, T11N, R9E, UM At total depth 1097' FSL, 1194' FWL, SEC 32, T11N, R9E, UM 6570' 6320' 12. Present well condition summary Total Depth: measured trUe vertical feet feet 6. Datum elevation (DF or KB) RKB 140'. PAD 104' 7. Unit or Property name Kuparuk River Unit 8. Well number 2G-o7 9. Permit number/approval number 84-$5(Conserv Order No, 10. APl number 50-029-21124 11. Field/Pool Kuparuk River Oil Pool Plugs (measured) 261) Effective depth: measured 6465' true vertical 621 5' feet feet Junk (measured) Casing Length Size Structural 8 0 2 0" Conductor Surface 21 78' 1 3- 3/8" Intermediate Production 631 2' 9- 5/8" Liner 537' 7" Cemented 278 SX CS II 1000 SX PF "E" & 450 SX PF "C" 850 SX CLASS G & 25O SX PF "C" 250 SC CLASS G Measured depth True vertical depth 1 05' 105' 2178' 2178' 6312' 6062' 6010'-6547' 5762'-6283' Perforation depth: measured 6322' - 6360 MD true vertical 6072'- 6110' TVD Tubing (size, grade, and measured depth) 3-1/2" J-55 9.3# TBG @ 6066' Packers and SSSV (type and measured depth) BAKER HB RETR PKR @ 5959', OTIS 3-1/2" X- NIPPLE @ 1722' MD 13. Stimulation or cement squeeze summary Alaska 0ii & Gas Cons. II~ m'''t~ ~'~t I1 Intervals treated (measured) 14. Treatment description including volumes used and final pressure Representative Daily Avera.qe Production or Iniection Data OiI-Bbl Gas-Md Water-Bbl Casing Pressure Tubing Pressure Prior to well operation Subsequent to operation 15. Attachments Copies of Logs and Surveys run __ Daily Report of Well Operations X 16. Status of well classification as: Water Injector WAG INJECTOR Oil _ Gas Suspended Service 17. I hereby certify that the foregoing is true and correct to the best of my knowledge. SiCn~/~:~ Form 10-404 Rev 05/17/89 Title Area Drilling Engineer Date ~_.~/~/~.~ SUBMIT IN DUPLICATE ARCO ALASKA INC. DAILY OPERATIONS PAGE: 1 WELL: BOROUGH: UNIT: FIELD: LEASE: API: PERMIT: APPROVAL: 2G-07 NORTH SLOPE' KUPARUK RIVER KUPARUK RIVER 50-029-21124 ACCEPT: 01/25/93 01:00 SPUD: RELEASE: 01/31/93 03:00 OPERATION: DRLG RIG: WO/C RIG: NORDIC i 01/25/93 (1) TD: 6570 PB: 6465 01/26/93 (2) TD: 6570 PB: 6465 01/27/93 (3) TD: 6570 PB: 6465 WORKING ON MOD TO RIG CELLAR MW:10.6 NaCl/Br MOVE RIG F/lC-06 TO 2G-07 (13.5 MILES). PARK RIG PAST WELL FOR RIG MODIFICATIONS. ACCEPT RIG @ 01:00 HRS 01/25/93. CUTTING & INSTALLING DOORS IN RIG CELLAR. MODIFICATIONS ARE REQUIRED DUE TO LONGER LUBRICATOR NECESSARY TO INSTALL/REMOVE VR PLUG ON LARGER, PRUDHOE-STYLE TREE. KILLING WELL W/13.6 MUD MW:10.6 NaCl/Br INSTALL DOORS ON RIG CELLAR STRUCTURE. REMOVE 7-1/16" BOP FORM CELLAR. MOVE RIG OVER WELL @ 15:30 HRS. ATTEMPT TO PULL VR PLUG. PULL BPV. RIG UP HARD LINES TO KILL WELL. TAKE ON MUD & COND SAME. CONT EFFORT TO PULL VR PLUG. PLUG RELEASED BUT CANNOT GET PAST VALVE DUE TO PULLING TOOL STEM DAMAGE. ROUND UP NEW PULLING TOOL. PULL VR PLUG AFTER MUCH DIFFICULTY. ESTIMATED TIME TO PULL VR PLUG -+ 9 HRS. REMOVE OUTSIDE VALVE. MAKE UP CAMPANION FLANGE & CHOKE LINE. KILLING WELL WITH 13.6 PPG MUD. CHECK ANN FOR OBSTRUCTION MW:10.6 NaC1/Br KILL .WELL-PMP DOWN TBG TAKING RETURNS THRU CHOKE & OUT TO FLOW TANK @ 2 BPM. MUD TO SURF. SHUT DOWN. BLOW DOWN LINE TO KILL TANK. CIRC & COND OIL & GAS CUT MUD. MONITOR WELL. WELL IS STATIC. SET BPV. ND TREE. NU 13-3/8" BOP STACK. TEST BOPE TO 3000 PSI. WITNESS OF BOP TEST WAIVED BY AOGCC REP JOHN SPALDING. LD LJT. PULL BLANKING PLUG & BPV. MU TRI-STATE SPEAR. SPEAR 3~1/2" TBG BELOW HGR. (HGR HAS WELD NECK ON PULLING THREAD). BOLDS. PU ON TBG. TBG IS FREE. HGR WILL NOT PASS THROUGH ANNULAR. RELAND TBG. RELEASE SPEAR. LD LJT. ND BELL NIPPLE TO CHECK ANN. RECEIVED MAR - 9 Alaska Oil & Gas Cons. (;ommissior~ Anchorage WELL : 2G-07 OPERATION: RIG : NORDIC 1 PAGE: 2 01/28/93 (4) TD: 6570 Pr: 6465 01/29/93 (5) TD: 6570 PB: 6465 01/30/93 (6) TD: 6570 PB: 6465 LOAD PIPE.SHED W/DP MW:10.6 NaCl/Br RD FLOW RISER & REMOVE RUBBER OBSTRUCTION FROM HY-DRIL. NU FLOW RISER & ATTEMPT TO PULL HGR TO FLOOR. HUNG UP ON TOP OF HY-DRILL. ND FLOW RISER, SNIFF BAG FOR GAS, REMOVE & DRESS TOP OF HY-DRILL. SPEAR TBG & PULL THRU HY-DRILL. RELAND TBG. NU FLOW RISER & PULL HGR TO FLOOR. BREAK OFF HGR, RELEASE SPEAR & LD. RU CIRC HEAD & CIRC WELL @ 72 SPM & 500 PSI. INCREASE TO 90 SPM & 600 PSI. NO GAS RETURNS. MIX & PMP 36 BBL, 14.5 PPG DRY JOB. RU TORQUE TURN & PREPARE TO TO PULL PLUG. POOH W/3-1/2" TBG-C/O COLLARS, DRIFT, & STRAP. PULLED 52 JTS, LD SSSV & RECOVERED 24 SS BANDS. CONT POOH W/3-1/2" TBG-C/O COLARS, DRIFT & STRAP. LD 13 JTS CORK SCREWED TBG. LD 6" OD SEAL ASSY. HAD 5 JTS TBG THAT WOULD NOT DRIFT. REMAINING TBG IN GOOD CONDTION. RD TORQUE TURN & TBG EQUIPMENT. RU TO RUN 3-1/2" DP TO FISH PKR. LOAD PIPE SHED W/DP MW:10.6 NaCl/Br SERV RIG & CHECK CROWN-0-MATIC. RU TO RUN FISHING ASSY IN HOLE. REMOVE OLD COLLARS & BAD TBG F/PIPE SHED. LOAD TRI-STATE TOOLS-LOAD PIPE SHED W/3-1/2" DP 4-3/4" DC'S. MU TRI-STATE TOOLS. RIH W/BHA %1 & 3-1/2" DP. @ 3246' STOP RING HANGING UP ON CSG COLLARS, CONT RIH SLOW WHILE WORKING PAST COLLARS. CONT TO RIH TILL TAG FISH @ 5984' (TOP OF 7" LINER). LATCH ONTO FISH & WORK FREE. CBU @ 100 SPM & 1200 PSI. PMP SLUG. THAW OUT KILL LINE. POH SLOW. LD PKR & TAIL PIPE ASSY. COMPETE RECOVERY. LD FISHING TOOLS. MU BIT. RIH W/BHA %2 TO CO TO PBTD. RIH W/3-1/2" COMP EQUIP MW:10.6 NaCl/Br CONT TO RIH W/3-1/2" COMP DP, BHA %2. TAG FILL @ 6397'. PU KELLY & WASH DOWN 2 JTS, TAG PBTD @ 6459'. CBU @ 3 BPM & 850 PSI. MIX & PMP 30 BBL DRY JOB. BLOW DN KELLY & RIG UP TO LD DP. PULL 44 JTS DP. HOLE NOT TAKING PROPER FILL. RIH. CIRC HOLE VOLUME @ 3 BPM & 850 PSI(NO GAS). MIX & PMP 30 BBLS DRY JOB. POOH W/3-1/2" DP & BHA %2. LD M/O DP & DC'S. RU TO RUN 3-1/2" TBG. LOAD PIPE SHED W/REPLACEMENT TBG. RIH W/3-1/2" COMP EQUIP. RE ¢EIVED MAR - 9 Alaska Oil & Gas Cons. f.;ornmissJo~: Anchorage WELL : 2G-07 OPERATION: RIG : NORDIC 1 PAGE: 3 01/31/93 (7) TD: 6570 PB: 6465 POH W/CV ON OTIS SL MW:10.6 NaCl/Br SERV RIG, CHECK CROWN-0-MATIC. CONT TO RIH W/3-1/2" COMP STRING. LAND TBG. RILDS. DROP BALL. PRESS TBG TO 2500 PSI, SET PKR & BLEED OFF PRESS. PRESS ANN TO 2500 PSI & TEST 15 MIN-OK. BOLDS & PU ON TBG TO SHEAR PBR. RELAND TBG. RILDS. PRESS TBG TO 2000 PSI TO TEST PBR SEALS. CONT TO PRESS TBG & SHEAR OUT BALL @ 4200 PSI. SET BPV, ND BOPE. PU TREE & NU SAME. PULL BPV, SET TEST PLUG. TEST PACKOFF @ 5000 PSI & TEST TREE @ 250 & 5000 PSI. PULL TEST PLUG. THAW ALL FROZEN PMP LINES & RU TO CIRC MUD FROM WELL. CIRC 215 BBLS FW DOWN ANN. DISPLACE WELL W/DIESEL. SITP 1950 PSI. ATTEMPT TO BLEED OFF ANN PRESS. MMG2 CHECK VALVE NOT HOLDING. CLEAN PITS. RU OTIS SL. RIH & LATCH MMG2 CHECK VALVE. POH. 02/01/93 (8) TD: 6570 PB: 6465 RIG RELEASED MW:10.6 NaCl/Br POH W/48/64" CHECK VALVE. VALVE WAS WASHED OUT. RIH & SET DV IN GLM @ 5891'. BLEED OFF ANN. MONITOR WELL. SITP=1950 PSI, SICP=0 PSI. RD OTIS. RU LUB. SET BPV. SECURE WELL. FIN CLEANING PITS & LINES. RELEASE RIG @ 15:00 HRS 01/31/93. PREP RIG FOR COLD STACK ON 2G PAD. SIGNATURE: DATE: MAR - 9 !993 Alaska Oil & Gas Cons. Oommiss~or, Anchorage 1. Type of Request: 2. Name of Operator " ' : STATE OF ~ ~ - ~ OIL AND ~ GONSERVATI~ COM~o~ON ' i/~ APPLICATION FOR SUNDRY APPROVALS Abandon_ Suspend _ Operation Shutdown _ Re-enter suspended well_ " Alter casing _ Repair well_ Plugging _ Time extension _ Stimulate _ Change approved program _ Pull tubing _ Variance x Perforate _ Other _ \ 6. Datum elevai;on (DF or KB) ARCO Alaska. Inc. 3. Address P. O. Box 100360, Anchorage, AK 99510 5. Type of Well: Development _ Exploratory _ Stratigraphic _ Service X 4. Location of well at surface 487' FSL, 236' FWL, Sec. 32, T11N, R9E, UM At top of productive interval 1091' FSL, 1187' FWL, Sec. 32, TllN, R9E, UM At effective depth 1093' FSL, 1189' FWL, Sec. 32, TllN, R9E, UM At total depth 1097' FSL, 1194' FWL, Sec. 32, T11N, R9E, UM 12. Present well condition summery Total Depth: measured 6570' feet true vertical 6320' feet 14 0' R K B faet 7. Unit or Property name Kuparuk River Unit 8. Well number 2G-07 9. Permit number 84-85 10. APl number 50-029-21 1 2400 11. Field/Pool Kuparuk River Field Kuparuk River Oil Pool Plugs (measured) None Effective depth: measured 6465 feet true vertical 6215' feet Junk (measured) None Casing Length Size Structural Conductor 105' 20" Surface 2178' 13-3/8" Intermediate Production 6312' 9-5/8" Liner Perforation depth: 537' 7" measured 6322' - 6340', true vertical 6072' - 6090', Cemented 278 Sx CS II 1000 Sx PF "E" & 450 Sx PF "C" 850 Sx Class G & 250 Sx PF "C" 250 Sx Class G 6340'- 6360' 6090'- 6110' Measured depth True vertical depth 105' MD 105' TVD 2178' MD 2178' TVD 6312' MD 6062' TVD 6010' - 6547' MD 5762' - 6283' TVD 13. Tubing (size, grade, and measured depth) 3-1/2", 9.3#, J-55 robin§ @ 6071' Packers and SSSV (type and measured depth) Otis "TR" SSSV @ 1678', FHL packer @ 5959' Attachments Description summary of proposal .~. laska 0il & Gas conS. Detail~ o~ration pr~ram _ BOP sket~ _ Install sub-surfacer spring controlled safety valve on WAG injector. 14. Estimated date for commencing operation ~ 15. Status of well classification as: February 1993 I Oil m Gas _ Suspended 16. If proposal was verbally approved j/J~ ( c~ Name of approver ~j~,;r ~,~o[z llDate approved Service Water and Gas In!actor J17. I hereby certify ~g is true and~rrect to the best of my knowledge. Sicjned C. JJ,.,)- ' Title ~' ~Jne'e'r" Date J FOR CONIVlISSION USE ONLY IConditions of approval: Notify Commission so representative may witness . JAppr.qv~ No.~ Plug integrity ~ BOP Test ~ Location clearance ~ , . r-. ~o'~t I ,~;~' Mechanical Integrity Test_ Subsequent form require 10. ¥0~x~:'3~"'"[i"ii ..~:'i',~i".. , ~:"'"' ,,,- ~ - ' A roved b order of t David W jonns'ton . pp ), he Commission ' Commissioner Date Form 10-403 Rev 09/12/90 SUBMIT IN TRIPLICATE · Attachment 1 Request for Variance Kuparuk Well 2 G~- 07 As per Conservation Order No. 173, Rule 5, paragraph (a) (2), ARCO Alaska requests Commission approval to replace the existing surface controlled, subsurface safety valve in Injection Well 2(~-07 with a downhole, spring controlled, injection valve. This injection valve will act as a one-way check valve allowing downward injection of water and gas while preventing upward flow of these fluids. The injection valve is capable of preventing uncontrolled upward flow by automatically closing if such a flow event should occur. The proposed installation of this safety valve would be performed during the upcoming workover to replace the packer, replace corkscrewed tubing and install AB modified tubing couplings. Attached is a schematic of the proposed injection valve. St J8 ORII~ICE E SEAT INSERT II. APl=ER VALVE AND SI=RING A$$E~SL¥ RECEIVED MAR 0,5 1993. Alaska Oil & Gas Cons, (;;emm~ss[On ;~chorag~ ARCO Alaska, Inc. ,. Post Office BoX 100360 Anchorage, Alaska 99510-0360 Telephone 907 276 1215 April 9, 1991 Mr. David W. Johnston, Chairman Alaska Oil and Gas Conservation Commission 3001 Porcupine Drive Anchorage, Alaska 99501 Dear Mr. Johnston: Attached in duplicate is a Report of Sundry Well Operations for the well listed below. 2G-07 Other If you have any questions, please call me at 263-4241. Sincerely, P. S. White Senior Operations Engineer J. R. Brandstetter ATe 1120 L. L. Perini ATe 1130 S. M. Renke ATe 1126 KeEl .4-9 w/o attachments RECEIVED APR 1 1991 Alaska 011 & Gas Cons. Commission Anchorage ARCO Alaska, Inc. is a Subsidiary of AtlanticRichfieldCompany AR3B-6003-C STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMMISSION REPORT OF SUNDRY WELL OPERATIONS ORIGInaL 1. Type of Request: Operation Shutdown__ Stimulate ~ Plugging Pull tubing Alter casing Repair well Perforate _ Other ;~ . 2. Name of Operator ARCO Alaska, In¢, 3. Address P. O. Box 100360, Anchorage, AK 99510 4. Location of well at surface 487' FSL, 236' FWL, Sec. 32, T11N, R9E, UM At top of productive interval 1091' FSL, 1187' FWL, Sec. 32, TllN, R9E, UM At effective depth 1093' FSL, 1189' FWL, Sec. 32, TllN, R9E, UM At total depth 1097' FSL, 1194' FWL, Sec. 32, T1 iN, R9E, UM 12. Present well condition summary Total Depth: measured 6570' feet true vertical 6320' feet 5. Type of Well: Development ~ Exploratory _ Stratigraphic Service ~ .~ Plugs (measured) None 6. Datum elevation (DF or KB) 140' RKB 7. Unit or Property name Kupamk River Unit 8. Well number 2(3-07 Injector 9. Permit number/approval number 9-792 10. APl number 5o-029-2112400 14. Fie~d/Poo~ Kuparuk River Field/ Kuparuk River Oil Pool Effective depth: measured 6465 feet true vertical 6215' feet Junk (measured) None Casing Length Size Structural Conductor 105' 20" Surface 2178' 13-3/8" Intermediate Production 6312' 9-5/8" Liner 537' ?" Perforation depth: measured 6322'- 6340', true vertical 6072' - 6090', Tubing (size, grade, and measured depth) Cemented 278 Sx CS II 1000 Sx PF "E" & 450 Sx PF "C" 850 Sx Class G & 250 Sx PF "C" 250 Sx Class G 6340'- 6360' 6090' - 6110' Measured depth 105' MD 2178' MD 6312' MD 6010' - 6547' MD 3-1/2", 9.3#, J-55 tubing @ 6071' Packers and SSSV (type and measured depth) Otis "TR" SSSV @ 1678', FHL packer @ 5959' 13. Stimulation or cement squeeze summary Intervals treated (measured) Treatment description including volumes used and final pressure True vertical depth 105' TVD 2178' TVD 6062' TVD 5762' - 6283' TVD RECEIVED Alaska 011 & t~as Cons. Anchorage 14. Prior to well operation Subsequent to operation Reoresentative Daily Average Production or In!ection Data OiI-Bbl Gas-Mcf Water-Bbl Casing Pressure Tubing Pressure -0- -0- 1100 BWPD 2550 psi 2200 psi -0- -0- 1500 BWPD 2850 psi 2140 psi 15. Attachments 16. Status of well classification as: Copies of Logs and Surveys runm Water Injector ;~ Daily Report of Well Operations X Oil _ Gas Suspended "~ 7. I hereby certify that the foregoing is true and correct to the best of my knowledge. Form 10-404 Rev 09/12/90 Service SUBMIT IN DUPLICATE 2G-07 Sundry Report April 9, 1991 Well 2G-07 has continuously injected water since November 1987 due to the suspected communication between the tubing and annulus. The well has injected between 1000-1500 BWPD on the average during this time. The well has historically passed all pressure-type Mechanical Integrity Tests (MIT) which have been conducted regularly. Future plans for this well consist of continued water injection while pressures are monitored. RECEIVED APR I 2 199! Alaska Oil & Gas tJons. [;ummission Anchorage ~ OIL AND GAS CONSERVATION COMMI,.~ON APPLICATION FOR SUNDRY APPROVALS 1. Type of Request: Abandon _ Suspend _ Alter casing _ Repair well Change approved program _ 2. Name of Operator ARCO Alaska. Inc. 3. Address 5. Type of Well: Development X Exploratory _ Stratigraphic _ Operation Shutdown _ Re-enter suspended well _ _ Plugging _ Time extension _ Stimulate _ Pull tubing _ Variance _ Perforate _ Other ~X 6. Datum elevation (DF or KB) RKB 140 7. Unit or Property name feet P. O. Box 100360, Anchorage, AK 99510 Service 4. Location of well at surface 487' FSL, 236' FWL, Sec.32, T11N, R9E, UM At top of productive interval 1091' FSL, 1187' FWL, Sec. 32, T11N, R9E, UM At effective depth 1093' FSL, 1189' FWL, Sec.32, T11N, R9E, UM At total depth 1097' FSL, 1194' FWL, Sec. 32, T11N, R9E, UM 12. Present well condition summary Total Depth: measured 6 5 7 0' feet true vertical 6 3 2 0 feet Effective depth: measured 6 4 6 5 feet true vertical 6 2 1 5 feet Casing Length Size Structural Conductor 8 0' 2 0" Surface 21 7 8 13 3/8" Intermediate Production 6312 9 5/8" Liner 5 3 7 Perforation depth: measured 6322'-6340', true vertical 6072',6090', Tubing (size, grade, and measured depth 3-1/2", 9.3#, J-55 tubing @ 6071' Packers and SSSV (type and measured depth) Otis "TR" SSSV @ 1678', FHL pkr @ 5959' 13. Attachments Description summary of proposal X' Continue water injection in Well 2G-07 ( See attached) 14. Estimated date for commencing operation Immediatelv 16. If proposal was verbally approved l, 6340'-6360' 6090',6110' Plugs (measured) Kuparuk River Unit 8. Well number 2G-07 :E~ ~c~o~ 9. Permit number 84-85 10. APl number so-02 9-21 1 2400 11. Field/Pool Kuparuk River Field Kuparuk River Oil Pool Junk (measured) Cemented 278 Sx CS II 1000 Sx PF "E" & 450 Sx PF "C" 850 Sx Class G & 250 Sx PF "C" 250 Sx Class G Measured depth True vertical depth 1 05'MD 105'TVD 2178'MD 2178'TVD 631 2'MD 6062'TVD 601 0'-6547'MD 5762'-6283'TVD RECEIVED SEP 0 7 [989 Alaska.Ojl .& Gas Cons. Commission ~ : jtnchnr~nR Detailed operation program ~ '-BoP s~k-etch _ 15, Status of well classification as: Oil __ Gas _ Suspended Name of approver Date approved S e r vi ce 7. I hereby certify that the foregoing is true an~ correct to the best of my knowledge. Signed ,~~,, ~"~/"J~~ ~FoRTitle COMMISSIoNSeni°r OperatiOnSuSE ONLyEngineer IApproval No. ~ .---~/~ ~ ApprO~edC.°PY I Ret~rnea ~ ~ Conditions of approval: Notify Commission so representative may witness Plug integrity m BOP Test_ Location clearance__ Mechanical Integrity Test m Subsequent form require Approved by the order of the Commission ORIGINAL SIGNED BY LONNIE C. SMITH Form 10-403 Rev 5/03/89 Commissioner SUBMIT IN TRIPLICATE 2G-07 Sundry A_n_olication ~/22/89 Well 2G-07 is suspected of having communication between the tubing and annulus. The source of the problem is thought to be at the packer. Communication is noticed only when the well is on gas injection, but not during water injection. The well has passed a pressure-type Mechanical Integrity Test (MIT). We are requesting to continue to inject water into the well while monitoring pressures. Pressures have not exceeded 70% of the maximum hoop stress. RECEIVED Alaska Oil & ~as Cons. Co~li~issior~ Anchorage I I I I I I t I I C~1~3 I I I I Ln t _I I I I =_ I I I 1 I I I I _1 t I I I I I I I I ! I I I I I I I I I I I I I I I I I I I I I I I t t I I t I I I I I I I I I I I I t m F 1 I I I I 1 I I I t I I I I I I I I I I I I I I I t I I I I I I I I I I I I I I I I I I I I I I t t I I I I I I I I I I I I I 1 t I I I I I I I I ', :, I I I I I I I I I I I____I I I I I I I I -I I I I t t I I I I I 1 I I I I I I ! t I i t I ~dooe l~ater InS. Annular FloJd: .It Itater I~J. Diesel seible InJ. G]ycol s InJ. Salt ~ater t Injeetln~ Other ~her 5 Gradient: AC, GCC liitnes:s ~_i2~ature: ARCO Alaska, inc. Date: June 17, 1988 Transmittal #: 7194 RETURN TO: ARCO Alaska, Inc. Attn: Brenda K. Miernyk Kuparuk Records Clerk ATO-1119 P.O. Box 100360 Anchorage, AK 99510-0360 Transmitted herewith are the following items. one signed copy of this transmittal. Please acknowledge receipt and return ,~ 1L-16 2D-05 ~ 2A-06 ~ 2W-09 ~ 3K-02 '~ 2G-07 ~ 2G-07 ~ 3B-06 ~ 3Q-15 Kuparuk Well Pressure'Report Water Injection Spinner Data Sheet Water Injection Spinner Data Sheet Gas Injection Spinner Data Sheet Kuparuk Fluid Level Report Kuparuk Fluid Level Report Kuparuk Fluid Level Report Kuparuk Well Pressure Report Kuparuk Well Eressure Report 6-02-88 PBU - Sand A 6-08-88 Both Sands 6-09-88 Both Sands 6-08-88 Both Sands 6-10-88 Tubing 6-10-88 Tubing 6-14-88 Casting 6-06-88 Static - Sand A 5-15-88 PBU - Both Sands RE Nask~ Oil & Gas Cons. Comm~ton :knowledged: N~c~-'"-mO Date' DISTRIBUTION: D & M State of Alaska ChcYron Mobil Unocal SAPC STATE Of ALASKA AL ~A OIL AND GAS CONSERVATION CC .)IlSSION REPORT OF SUNDRY WELL OPERATIONS 1. Operations performed: Operation shutdown [] Stimulate [] Plugging [] Perforate [] Pull tubing [] Alter Casing [] Other ,~ 2. Name of Operator ARCO A1 aska~. Inc. 3. Address P.0. Box 100360 Anchora~e~ AK 99510-~0360 4.*Location of well at surface 487' FSL, 236' FWL, Sec.32, TllN, RgE, UN At top of productive interval 1091' FSL, 1187' FWL, Sec.32, TllN, RgE, UM At effective depth 1093' FSL, 1189' FWL, Sec.32,. TllN, RgE, UM At total depth 1097' FSL~ 1194' FWL, Sec.32, T11N, RgE~ UN 11. Present well condition summary Total depth: measured true vertical Effective depth: measured true vertical Casing Length Conductor 80' Surface 2178' 6570 ' MD 6320 ' TVD 6465 ' MD 6215'TVD Size 20" 13-3/8" Producti on 6312 ' 9-5/8" Liner 537 ' 7" feet feet feet feet 5. Datum elevation (DF or KB) RKB 140' 6. Unit or Property name Kuparuk River Unit 7. Well number 2G-7 8. Approval number 7-37 9. APl number 50-- 029-21124 10. Pool KuDaruk River Oil Pool Plugs (measured) None Junk (measured) None Cemented 278 sx CS II 1000 sx PF "E" & 450 sx PF "C" 850 sx Class G & 250 sx PF "C" 250 sx Class G Perforation depth: measured 6322'-6340' 6340'-6360' Feet true vertical 6072'-6090' 6090'-6110' Tubing (size, grade and measured depth) 3-1/2", 9.3#, J-55 tubing @ 6071' Packers and SSSV (type and measured depth) Otis "TR" SSSV @ 1678', FHL pkr @ 5959' 12. Stimulation or cement squeeze summary Measured depth 105 'MD 2178'MD 6312 'MD 6010 ' -6547 'MD True Vertical depth 105 ' TVD 2178 ' TVD 6062 ' TVD 5762 ' -6283 'TVD RECEIyrcD 0 5 ]987 'Alaska 0ii & 6as CoaS. ~mmissl0[~ N/A Intervals treated (measured) Treatment description including volumes Used and final pressure Anchorage 13. N/A Prior to well operation Subsequent to operation Representative Daily Average Production or Iniection Data OiI-Bbl Gas-Mcf Water-Bbl Casing Pressure Tubing Pressure 14. Attachments Cancel I ati on reqUest Daily Report of Well Operations [] Copies of Logs and Surveys Run [] 15. I hereby certify that the foregoing is true and correct to the best of mY knowledge ~~, /--I/~'~ Signed Form 10-404 Rev. 12-1-8 TitleAssociate Engineer (JG) SW02/67 Submit in Duplicate~,~ 2G-7 REPORT OF SUNDRY WELL OPERATIONS The work described in our Application for Sundry Approvals, dated 1-16-87, has not been performed, and it is not currently scheduled to be done in the immediate future. Therefore, please cancel our request (Approval #7-37). SWO2/67a 8-3 -87 STATE OF ALASKA .,--~ ALASK,. OIL AND GAS CONSERVATION COMb. ~ION APPLICATION FOR SUNDRY APPROVALS feet I 7 1. Type of Request: Abandon [] Suspend [] Operation Shutdown [] Re-enter suspended well ~ Alter casing [] Time extension [] Change approved program [] Plugging [] Stimulate [] Pull tubing~,,Amend order [] Perforate ~ Other.,~ 2. Name of Operator ARCO Alaska, Inc. 3. Address P.O. Box 100360 Anchorage, AK 99510-0360 4. Location of well at surface 487' FSL, 236' FWL, Sec.32, T11N, R9E, UM At top of productive interval 1091' FSL, 1187' FWL, $ec.32, TllN, RgE, UM At effective depth 1093' FSL, 1189' FWL, Sec.32, TllN, RgE, UM At total depth 1097' FSL, 1194' FWL, Sec.32, TllN, Rg.E.~, UM 11. Present well condition summary Total depth: measured 6570 'MD true vertical 6320 'TVD feet feet 5. Datum elevation (DF or KB) RKB 140' 6. Unit or Property name Kuparuk River Unit 7. Well number 2G-7 8. Permit number 84 -85 9. APl number 50-- 029-21124 10. Pool )~uparuk River Oil Pool Plugs (measured) None Effective depth: measured 6465 'MD true vertical 6215'TVD feet feet Junk (measured) None Casing Length Conductor 80' Surface 2178' Size 20" 13-3/8" Production 6312' 9-5/8" Li net 537 ' 7" Perforation depth: measured 6322'-6340, Cemented 278 sx CS II 1000 sx PF "E" & 450 sx PF "C" 850 sx Class G & 250 sx PF "C" 250 sx Class G , 6340'-6360' Measured depth 105 'MD 2178 'ND 6312 'MD ' 6010 ' -6547 ' MD true vertical 6072'-6090', 6090'-6110' Tubing (size, grade and measured depth) 3-1/2", 9.3#, J-55 tubing @ 6071' Packers and SSSV (type and measured depth) Otis "TR" SSSV ~ 1678',,, "FHL" pkr ~ 5959' 12.Attachments RECEIVED WueVertical depth 105'TVD 2178'TVD 6062'TVD 5762'-6283'TVD Naska 0il & Gas Cons. Commission Anchorage BOP sketch Description summary of proposal ~, Detailed operations program - 13. Estimated date for commencing operation Januar¥.17, 13~7 14. If proposal was verbally approved Mechanical ±ntegrity test ±s requ±red. in advance. Name of approver Mike Mi nder~ AOGCC , Date approved 15. I hereby certif~y that the foreg, ging is true and correct to the best of my knowledge Signed ~_~ ~~~ Title Associate Engineer , ~ Commission Use Only (JG)SA/210 Conditions of approval Notify AOGCC Date Notify commission so representative may witness I Approval No. [] Plug integrity ,m, BOP Test ~ Location clearanceI '~ ' J7 Approved by Commissioner Dy order ~~ the commission Date Form 10-403 Rev 12-1-85 Submit in triplicate 2(;-7 Workover Procedure Replace Buckled Tubing, Recover W/reline Fish, and Change Out Couplings to AB HOD 1. MIRU workover rig. 2. RU WL. Punch h°le in tubing @ ±5840. RD WL. 3. Circulate kill weight fluid. 4. ND tree. NU & test BOP. 5. Screw into tubing hanger. Pick up and sting out of PBR. Circulate kill weight fluid. 6. POOH with tubing. Lay down any buckled or damaged Joints. 7. RIH with packer retrieving tool on drill pipe. Latch onto FHL packer. Unseat packer. Circulate bottoms up. POOH and lay down packer and tailpipe.. 8. Re-run completion assembly with redressed packer, AB MOD couplings, and redressed SSSV. 9. ND BOP. NU & test tree. 10. Displace well to diesel. 11. Set BPV. 12. Secure well. 13. Release rig. Anticipated Bottomhole Pressure = 3100 psi Completion Fluid will be 10.2 PPg NaCl/NaBr brine. RECEIVED Gas Cons. Anchorage JLq/ih MO2 1/14/87 ANNULAR PREVENTER 8 BLIND RAHS 6 4 11. 12. 13. ACCUMULATOR CAPACITY TEST 1 , CHECK AND FILL ACCUMULATOR RESERVOIR TO PROPER LEVEL WITH HYDRAULIC FLUID, 2. ASSURE THAT ACCUMULATOR PRESSURE IS 3000 PSI WITH 1500 PSI DOWNSTREAM OF THE REGULATOR, :3. OBSERVE TIME, THEN CLOSE ALL UNITS SIMULTANEOUSLY AND RECORD THE TIME AND PRESSURE REMAINING AFTER ALL UNITS ARE CLOSED WITH CHARGING PUMP OFF. 4. RECORD ON THE IADC REPORT. THE ACCEPTABLE LOWER LIMIT IS 45 SECONDS CLOSING TIME AND 1200 PSI REMAINING PRESSURE. BOP STACK TEST 1, 20" CONDUCTOR 2, 20" SLIP ON WELD X 21-1/4" 2000 PSI STARTING HEAD · :~. 13-3/8" SLIP ON WELD X 1;~-5/8" 14. 5000 PSI CASING HEAD 4. I~;-5/8" 5000 PSI X 13-5/8" 5000 PSI TUBING HEAD 5. 1:3-5/8" 5000 PSI DOUBLE STUDDED ADAPTOP 6. ! t" - 5000 PSI BLIND RAMS 7, 11" - 5000 PSI PIPE RAMS 8. 11"- 5000 PSI ANNULAR 1, FILL BOP STACK AND MANIFOLD WITH ARCTIC DIESEL, 2. CHECK THAT ALL HOLD-DOWN SCREWS ARE FULLY RETRACTED, PREDETERMINE DEPTH THAT TEST PLUG WILL SEAT AND SEAT IN WELLHEAD, RUN IN LOCK-DOWN SCREWS IN HEAD, 3. CLOSE ANNULAR PREVENTER AND CHOKES AND BypAss VALVES ON THE MANIFOLD. 4, TEST ALL COMPONENTS TO 250 PSI AND HOLD FOR 10 MINUTES, 5. INCREASE PRESSURE TO 1800 PSI AND HOLD FOR 10 MINUTES. BLEED TO ZERO PSI. 6. OPEN ANNULAR PREVENTER AND CLOSE PIPE RAMS, 7. INCREASE PRESSURE TO 3000 PSI AND HOLD FOR 10 MINUTES. 8. CLOSE VALVES DIRECTLY UPSTREAM OF CHOKES. BLEED DOWNSTREAM PRESSURE TO ZERO PSI TO TEST VALVES, TEST REMAINING UNTESTED MANIFOLD VALVES, IF ANY, WITH 3000 PSI UPSTREAM OF VALVE AND WITH ZERO PSI DOWNSTREAM, BLEED SYSTEM TO ZERO PSI, 9. OPEN PIPE RAMS, BACKOFF RUNNING JOINT AND PULL OUT OF HOLE, CLOSE BLIND RAMS AND TEST TO 3000 PSI FOR 10 MINUTES. BLEED TO ZERO PSI. 10, OPEN BLIND RAMS AND RECOVER TEST PLUG, MAKE SURE MANIFOLD AND LINES ARE FULL OF ARCTIC DIESEL AND ALL VALVES ARE SET IN THE DRILLING POSITION, TEST STANDPIPE VALVES TO 3000 PSI, TEST KELLY COCKS AND INSIDE BOP TO 3000 PSI WITH KOOMEY PUMP, RECORD TEST INFORMATION ON BLOWOUT PREVENTER TEST FORM. SIGN AND SEND TO DRILLING SUPERVISOR. PERFORM COMPLETE 8OPE TEST ONCE A WEEK AND FUNCTIONALLY OPERATE BORE DAILY, RFCEj TM viD Oil & Gas,o~,,.,.r';"'~' Coramissior~ , ~nchci'aga dO dANUARY 16, 1987 ( NORDIC RI0) ARCO Alaska, Inc. Post Office B'b,, ,00360 Anchorage, Alaska 99510-0360 Telephone 907 276 1215 January 16, 1985 Mr. C. V. Chatterton, Chairman Alaska Oil and Gas Conservation Commission 3001 Porcupine Drive Anchorage, AK 99501 Dear Mr. Chatterton: Attached in duplicate are subsequent notices following wells at the Kuparuk River Field: Well Action Date Performed on the 1L-1 Conversion 1L-7 Conversion 1Q-2 Conversion 1Q-7 Conversion 1Q-11 Conversion 1Q-13 Conversion 2B-5 Conversion 2B-9 Conversion 2C-1 Conversion 2C-3 Conversion 2C-6 Conversion 2C-8 Conversion 2D-2 Conversion 2D-7 Conversion 2D-11 Conversion 2D-14 Conversion 2F-1 Conversion 2F-2 Conversion 2F-13 Conversion 2F-14 Conversion 2G-3 Conversion 2G-3 Conversion 2G-5 Conversion 2G-7 Conversion 2G-10 Conversion 2~-12 Conversion 2G-16 Conversion 2U-3 Conversion 2U-4 Conversion 2U-7 Conversion 2U-16 Conversion 2W-2 Conversion 2W-4 Conversion 11/18/85 11/18/85 11/17/85 11/17/85 11117/85 11/17/85 11/23/85 11/23/85 11/19/85 11119/85 11/19/85 11/19/85 11/20/85 11/20/85 11/20/85 11/20/85 11/21/85 11/21/85 11/2i/85 11/21/85 11114185 11/14/85 11114185 11/1/-1/85 11/14/85 11114185 11/14/85 RECEIVED 11/16/85 11/16/85 JAN. ) ll/16/B5 11 / 1 5 / 8,~ask~ Olt & Gas Cons, 11 / 22 / 85 ARCO Alaska, Inc. is a Subsidiary of AllanticRichfieldCompany ~ STATE Of ALASKA ALASKA OIL AND GAS CONSERVATION COMMISSION SUNDRY NOTICES AND REPORTS ON WELLS 1. DRILLING WELL [] COMPLETED WELL OTHER [] 2. N,~m~(~6Op,~.~ 7. Permit No. SKA, INC. 84-85 3. Address 8. APl Number P. O. BOX 100360, ANCHORAGE, ALASKA 99510 50- 029-21124 4. Location of Well SURFACE LOCATION: 487' FSL, 235' FWL, SEC. 32 T11N, RgE, UM 5. Elevation in feet (indicate KB, DF, etc.) 1 40' (RKB) 6. Lease Designation and Serial No. ADL 25656 ALK 2582 9, Unit or Lease Name KUPARUK RIVER UNIT 10. Well Number 2C-7 11. Field and Pool KUPARUK RIVER FIELD KUPARUK RIVER OIL POOL 12. (Submit in Triplicate) Perforate [] Alter Casing [] Perforations Stimulate [] Abandon [] Stimulation Repair Well [] Change Plans [] Repairs Made Pull Tubing [] Other [] Pulling Tubing (Note: Report multiple completions on Form 10-407 with a submitted Form 10-407 for each completion.) Check Appropriate Box To Indicate Nature of Notice, Report, or Other Data NOTICE OF INTENTION TO: SUBSEQUENT REPORT OF: (Submit in Duplicate) [] Altering Casing [] Abandonment [] Other 13. Describe Proposed or Completed Operations (Clearly state all pertinent details and give pertinent dates, including estimated date of starting any proposed work, for Abandonment see 20 AAC 25.105-170). On November to a water conversion 14, 1985 Kuparuk well 2G-7 was converted from a producer injector well as part of the full field waterflood effort. Water is being injected into the "A"sand. ' rFIVED 1986 14. I hereby certify that the foregoing is true and correct to the best of my knowledge. Signed ~/~, :~.,,[,c¢.,~.,~r~ Title KUPARUK The space below for Commission use OPERAT ! ONS COORD I NATOR Date 1 2 / 1 8 / 8 5 Conditions of APproval, if any: By Order of Approved by COMMISSIONER the Commission Date Form 10-403 Rev. 7-1-80 Submit "Intentions" in Triplicate and "Subsequent Reports" in Duplicate ARCO Alaska, Inc. J Post Office Bu^ 100360 Anchorage, Alaska 99510 Telephone 907 276 1215 September 16, 1985 Mr. C. V. Chatterton Commissioner State of Alaska Alaska Oil & Gas Conservation Commission 3001 Porcupine Drive Anchorage, AK 99501 SUBJECT: 2G-7 Dear Mr. Chatterton' Enclosed is a copy of the 2G-7 core description to include with the Well Completion Report, dated 2/20/85. If you have any questions, please call me at 263-4944. Sincerely, Gruber Associate Engineer JG/tw GRU11/L53 Enclosure Gas Cor~s. gommission Anchorage ARCO Alaska, Inc, is a Subsidiary of AtlanticRichtieidCompany ARCO Alaska, Inc/ Post Office ~',~ 100360 Anchorage, Alaska 99510-0360 Telephone 907 276 1215 September 20, 1985 Mr L. C. Smith · Alaska Oil and Gas Conservation Commission 3001 Porcupine Street Anchorage, AK 99501 Dear L. C. Smith: Per our conversation on September 4, 1985, ARCO Alaska, Inc. proposes to convert 110 production wells to water injection to implement fullfield waterflood of the Kuparuk River Unit. As discussed a single "blanket" sundry notice (form 10-403) has been completed for all well proposed to be converted to water injection. Individual subsequent sundry notices will be filed when the actual well conversions occur. As stated in form 10-403, well conversion to water injection will occur in two primary stages. The first stage will convert approximately four wells per dri!lsite to achieve a nine-spot pattern. First stage conversions are expected to be completed by approximately 10/15/85, prior to waterflood startup. The second stage of conversions will convert approximately four additional wells per drillsite to achieve a line drive pattern. Second stage conversions are expected~to be completed mid-December to January 1986. I would like to express my thanks and appreciation to the CommissiOn in working with ARCO Alaska, Inc. in this area. If you have any questions please call me at 263-4212. Sincerely, T. M. Drumm Kuparuk Operations Coordinator cc: J.F. Beall TMD:ps:013 RECEIVED s £p z o O. & 6as Cuns. Commission Anchorage ARCO Alaska, Inc. is a Subsidiary of AtlanticRichfieldCompany STATE OF ALASKA ALASK/~r'~,L AND GAS CONSERVATION Cr~'~,MISSlON SUNDRY NOTICES AND REPORT,, ON WELLS 1. DRILLING WELL [] COMPLETED WELL OTHER [] 2, Name of Operator 7, Permit No, ARCO Alaska, Inc. see attached 3. Address 8. APl Number P.O. Box 10036'0, Anchorage, Alaska 99510 50- see attached 4. Location of Well 5. Elevation in feet (indicate KB, DF, etc.) N/A 6, Lease Designation and Serial No, see attached 9, Unit or Lease Name Kuparuk River Unit 10, Well Number see attached 11, Field .and Pool Kuparuk River Field Kuparuk River 0il Pool 12, (Submit in Triplicate) Perforate [] Alter Casing [] Perforations Stimulate ' [] Abandon [] Stimulation Repair Well [] Change Plans [~ Repairs Made Pull Tubing [] Other XJ~ Pulling Tubing (Note: Report multiple completions on Form 10-407 with a submitted Form 10-407 for each completion.) Check Appropriate Box To Indicate Nature of Notice, Report, or Other Data NOTICE OF INTENTION TO: SUBSEQUENT REPORT OF: (Submit in Duplicate) [] Altering Casing [] Abandonment [] Other [] [] [] 13. Describe Proposed or Completed Operations (Clearly state all pertinent details and give pertinent dates, including estimated date of starting any proposed work, for Abandonment see 20 AAC 25.105-170). Pursuant to form 10-403, it is proposed that the attached list of U^producing wells in the Kuparuk River Field be converted to water injection. The conversion will occur in two stages. The first conversion: to a nine-spot pattern will occur approximately 10/15/85. The second conversion to a line drive pattern will occur apProximately 12/15/85. Injection will be into the A and C sands. £CE VED S£P 2 o 19 5 Atasga 0il & Gas Cons. commission Anchorage 14. I hereby certify that the foregoing is true and correct to the best of my knowledge. Signed ::~'/~'~')~ ~'~'~'~'~'~'"~--~ Title Kuparuk Operations Coordinator Date 9/18/85 The space below for Commission use Conditions of Approval, if any: Form 10-403 Rev. 7-1-80 Approved Copy By Order of COMMISSIONER the Commission Date Submit "Intentions" in Triplicate and "Subsequent Reports" in Duplicate Core #17 Core #18 Core #19 2G-7 CORE DESCRIPTION Cut 6323' - 6382'; recovered 35' Cut 6382' - 6415'; recovered 33' Cut 6415' - 6457'; recovered 41.5' 32' sandstone, 3' mudstone 29' mudstone, 4' sandstone 2' siltstone, 39.5' kingak shale (Cores were taken with an oil-based mud.) GRU11/CD01: tw 09/16/85 RECEIVED SEP 2 o 1985 Alaska OJJ & Gas Cons. Commission Anchorage - 6 - 7 - 8 2D- 2 -- 4 - 5 - 7 -10 -11 -14 -16 2E-10 -12 -13 -14 2F- 1 - 2 - 3 - 4 -13 -14 -15 -16 2G- 1 - 3 - 5 - 7 -10 -12 -16 2u- 3 - 4 - 7 -11 -14 -16 2V- 2 - 4 - 5 - 6 -- .7 -- 2W- 2 - 4 - 5 - 8 - 9 MARK:0092 100 96 95 84-152 151 126 143 101 99 159 161 84-230 211 196 197 83-183 188 187 190 156 159 172 177 84-118 139 80 85 106 128 132 85- 6 7 20 40 84-247 249 83-161 165 176 179 180 186 85- 16 12 84-191 212 219 20979 20970 20974 029-21177 21176 21157 21169 21135 21134 21183 21185 029-21246 21227 21213 21214 029-21058 21063 21062 21065 21032 21035 21048 21052 029-21150 21165 21119 21124 21140 21159 21163 029-21269 21270 21283 21303 21262 21264 029-21037 21041 21051 21054 21055 21061 029-21279 21275 21208 21228' 21235 25653 25658 25658 25657 25656 25644 25643 25655 25644 25655 25642 2580 12/15/85 " 10/15/85 " 12/15/85 2579 12/15/85 " 10/15/85 " 10/15/85 " 12/15/85 2584 10/15/85 " 12/15/85 " i2/i5/85 " 10/15/85 2584 12/15/85 "' 12/15/85 " 12/15/85 " 12/15/85 2583 12/15/85 " 12/15/85 " 10115/85 " 10/15/85 " 12/15/85 " 12/15/85 " 10/15/85 " 10/15/85 2582 12/15/85 " 10/15/85 " 10/15/85 " 12/15/85 " 10/15/85 " 12/15/85 " 10/15/85 2575 10/15/85 " 12/15/85 " 10/15/85 2574 10/15/85 " 10/15/85 " 12/15/85 2581 10/15/85 2575 10/15/85. " lO/15/o5 " 12/15/85 2581 10/15/85 " 12/15/85 2573 10/15/85 " 12/15/85 " 12/15/85 r%Q/15/85 r ECEIVru/ / s Alaska Oil & Gas Cons. 6ommiSsior~ ARCO Alaska. Inc,,/-'"% Post Offic~ .. 100360 Anchorage. Aiast~a 99510-0360 Telephone 907 276 1215 DATE: 09-12-8 5 TkANS~ITTAL NO: 5349 P, ETURN TO: ARCO ALASKA, INC. KUPARUK OPEtCATIUN~ ENGINEERING RECORDS CLERK ATO-1115B P.O. DOX 100360 ANCHORAGE, AK 9951U TRANSMITTED HEREWITH ARE THE FOLLOWING ITEHS. PLEASE ACKNOWLEDGE RECEIPT AND RETUPd~ ONE SIGNED COPY OF THIS TRANSMITTAL. "lA- 4 --- -~2G-7.~- ---2V-8A-~ --2Z-4 ~ STATIC SOTTOMHOLE PRESSURE REPO~<T 1/20/85 STATIC BOTTO[4HOLE PRESSURE REPORT 1/23/85 STATIC BOTTOMHOLE PRESSURE REPORT 1/24/85 STATIC BOTTONtlOLE PRESSURE REPORT 1/19/85 PRESSURE BUILDUP REPORT 1/21/85 PRESSUR/~ BUILDUP REPORT 1/'24/85 STATIC BOTYO~IHOLE PRESSURE REPORT 1/24/85 RECEIPT ACKNOWLEDGED: BPAE CURRIER CHEVkON D & N D~ILLING L. JOHNSTON NSK CLEhK DISTRIBUTION: W. PASHER EXXON PHILLIPS OIL J. ~AT~/,1E ~.L* DATE: SOHIO UNION K.TULIN/VAULT ARCO Alaska, Inc. is a Subsidiary of AtlanticRichfietdCompany ALASKA Oil, AJID EA$ O0#$EIII/AI'IOII.GOMMI$$1011 ... 3ool PORCUPINE DRIVE '**ANCHORAGE,ALASKA 995014.31'92 TELEPHONE(907) 279,-1433 We wish to bring to your attention that the Commission has no~- yet received the following required items on the subject well which our records indicated was completed-~7--/-~-" ~''-'zzz -~.. o. Article 536(b) of Title 20, Chapter 25, Alaska Administrative Code, .stipulates that this material shall be filed within 30 days after completion of a drilled.well. Please submit the above missing material. Chairman lc~C.024 ARCO Alaska, Inc. Post Office [3ox 100360 Anchornge, Aiaska 99510-0360 Te!ephone 907 276 1215 DATE' 05-2 9-8 5 TI~N SM I~m'' ~ ..~ NO' 5203 RETURN TO' ARCO ALASKA, INC. KUPARUK OPERATIONS ENGINEERING RECORDS CLERK ATO-11!SB P.O. BOX 100360 ANCHORAGE, AK 99510 TIC, NSC'ii'f 'fED IIEREWIT~I ARE 'file FOLLOWING I'fE'~S R~EIPT ~ND RETU.u~ ONE SIGN'.'D COPY OF THiS SEQUE''''''~v,~,..~ OF .,n' ~:,~mq,.~....., PRESSURE DATA '2A-3 PBU- '~' SAND 2A-5 SBt1? 2B-1 PBU 2B-2 PBU 2B-15 PBU- POST FRAC - 2B-!6 PBU 2F-.7 PBU- STATE .. 2F-8 :' t:BU- 'A' SAND .~. ztr~.~/PB U- STATE _2 O -3..¢~ PBU 2G-!2 PBU- 'A' SAND POST FRAC 2H-!5 ISB}tP 2%~-!3 PBU- 'C' SAND 2X-13 PBU 03-16-85 11-21-84 04-01-85 04-02-85 04-09-85 04-10-85 04 -14-85 04-20-85 ...... 04-13-85 04-11-8 5 03-23-85 04-1 0-8 5 04-21-85 03-30-85 PLEASE A~.'"?;:~ OWLI':DGE T FJ;I',] S' -r .4= TTAL. .~AKER/ LYNES PRESSURE REPORTS (ONE COPY OF EACH) lA-1 PDU 04-23-85 lA-2 PBU 04-2 3-85 lA-2 PBU 04 -23-85 lA-5 BUILD-UP 04-23-35 lA-6 PBU 04-23-85 lA-6 BUiLD-UP 04-23-S5 iA-10 BUILD-UP 04-23-85 iA-10 BUILD-UP 04-23-85 SET DEPTH 7187' 7476' 7476' 6957' 8300' 8300' 8415' 8415' TOOL NO. 1722 1302 1512 1734 1719 2062 1508 1299 .,RECEIPT ACKNOWLEDCED' 13 PAE * J. CURRIER* £[I? ~'- . ,-, ~, ~';0,1 * .) & .DRILLING L. O0[]NSTON MOBIL* NSK CLERK DISTRIBUTION: W PAS ~''' . ~ t'., R E X MO PHILLIPS OIL* J. RAT][MELL* Ancn0rage ~ "'n OF S · A _ E ALAS :,~. SOHIO* UN iON * " N/VAuL n TUL" :' ~"-~ ARCO Alaska, Inc;: Post Office I~ux 100360 Anchorage, Alaska 99510-0360 Telephone 907 276 1215 I:;: E'T' .J I':;i'.! T C! · ( (3 i'-! Ii;: C'. (3 I::' Y C) F' I::. ;4 t., t'l ) I... Yt'! '":' 2W .... ~ S / F'I.{U C: A H C 0 t !":; --' 'j 2 ~ 1::' [.), U I:': [."] I:" (;)l;:'f' I (~ .... t'",:.:"/ r:' E': U i;; Ii;; F' C)I:;.: 1" i t' '"' 'i 'J ~r-:' i;.~ t..t F;~ 1::; I::' cI j:,,,']" 2 i.~ --. t ,/' ,s' T ~.~'f' ;I; C C; I:;.: ¢'.: );) ;I; 1:~. i',,! T ( 1::' L. Ii;: Pi ;.~' L:.' i'.,! C) 'T E "1' I-I Z :~' 2 [{- 1 ~ / F:' .t:.; tJI:;; IE F:' El l:;.:'f' ,i 2 ][i¢'"' i ,."]'.,"/ F:' ;C{ t.J F;.'. ,r..:' I::' C)I:;;']" 2 L"- i 'i v"/F'.[.): U !:;: E F:' C! F:.: T 2:);) i5~,~ I::' F;: tE S; ,~.;.' U F;; I?' I::':~-":1..I.. 131::'1-: 2. F" 8 1::' ][(; U !';; Iii; F:' (;)F;; T ?. I::'-- I t '~/ F:' ?: t..I I:;.: Iii; I:" (3 I:;;'f 2 6 "-7 ,,/ F:' );i',' UF;; E F:' C! F:.: T l:k:l::'"f' I::' I';,' '":" T I"1 ]. i"t, ) F;: IE .C E'. ]; F"I" :'-':~ C i'--'. N~) t.J I.. Ii; [; C;- IZ ;(): poS*, 0~I~_=~ NasY, a j~nchOta~=f~nl 2?6 121= ssioner $~'~,~ (3il ~ ~ ~chOr~g= ' cron. . ~e%% the ~ ~,,¢~%%oos, ~ I{ yOU h~e a~Y q"~- sincerelY' £nc%osure RECEIVED MAY 0 I 1985 Ott& Gas Con~. ~ Anchoralle ADDENDUM WELL: 10/22/84 2G-7 6460' PBTD RU WL. RU BOP & lubr, tst to 2500 psi. Log rn #1 w/temp/CCL log. Tag btm @ 6464', log f/6464'-5900', POOH & RD. Secure well. Drilling ~uperintendent RECEIVED ALASKA OIL AND ~A$ ~,ON$ERFArlO#.~,Offffffl$$10N soot ANCHOFI~OE,ALAgKA TELEPttOFIE 1~o7,) /Ht/-.,'__B E ~./Z. y :T~)/VF_ n We wish to bring to your attention that tile Commission has hoE" yet received the following required iteme on.the subject, well bhich our records indicated was completed Article 536(b) of Title 20, Chapter 25, Alaska Administrative Code, stipulate, that tl,i~ material shall be filed within 30 daye after completion of a drilled.well. Please ~ubmit tile above Chairman mieeing material. · · · Ic'C.02~ ARCO Alaska, Inc Post Offi¢ ' x 100360 Anchorage, Alaska 99510-0360 Telephone 907 276 1215 F.i E T U F,'N TO' ARCO AI_A.~I<A, INC. AT'tN: RE, CORDS' CLERK ATO- t i i 5B F:'. O. BOX f 0'3.'36'~ , A -- C) r.~ A-h~r'H,qRHGI-,, .:. .. Al( 9-'- ,._, t 0 OF' 2' 'T' R ,:?, N,.:~,"' TM I T T E D I--1 F-I-:: r.- ht I T I-.I A R ':-' -f' H E F 0 I._ I._ .r)H I N G I 7' E H 3; ~. I ~' -~ ...... r .... :x~--~..~[:~. ACt(Uril;JL ['L'.'f.;['- !:~:[:'C..I:TII:"'F ,":ii~.P I:;:ETUF:N ONE'.';'IG.i',!ED COF"( OF TFII2 TI::,'AN2MI'rTAL, 3: F; I;;! U E i',' C. IZ 0 F E V E N T."7 ' fi.,--3 'A' 2AND FRAC-GELLED WATEF; '~, ~'-'~:.. _. .~TATIC BI--IP i Y- i t F' B U . I Y- t t F'E,'U ..'.'- -'.' ~" i ,.L! :.! t r.~ ..- .m P B U I G-2 GELLED WATER FRAC fG-t HYDRAULTC Fr.'AC · I, L-I6 POST FRAC TEHP LOC-3' .... , Iz, ~ F'BU 2D-I5 F'b:J ~-', z CTATIC BHF' .~..Z. -- '._' ,_~ , i._c--t ~. ''') F'T---:U ,1/i 26-7. F'BU 4/t i E--27 GELLED WATER E:ATCH FF,'AC 4/t '!.'E--27 F'O,S.T FRAC TEHF' LOG 4/t 2W ..... ! £TATIC BHF' 4/f .._..'" ..v,.._ ,_,"z£TAT I C ,,.:. H Fr: , 41 t IE-i6 INJECTIVITY TE£T ISZF' 4/t ? ! 1-- 4 ° "" '" . .... ~,,.-,TIC BHP 4/t 2 U - '5 B H F' 4/i '"" '" BHP 4/I ;;2 :..' ~' ~ . ~U--t r-:i-iF' 4/t '-'"" i "- PBU 4/t ~.~..:... ---. ,_..,, I!-.---i6 PO2T FRAE TEHF' L. OG 4/1 '* "" - t BHF' 4/t .v.'./", ' iF-f6 F'O2T I--':'I-':.:AC TEHP LOG .4/t iF .... t,:5 HY!),. FRACTURE 4/1 '"') F ~. --7 F'BU 4/t 2F-'7 F'RU 4/t 413/85 41318.5 4/2/8_5 4/t -2/85 3/3t/85 3/3t/85 4/t/85 4/t/85 4/2/815 4/9- t O/85 4/7-8/85 4/8/85 f - t 3/85 t - I="'185 2/85 3/85 3185 3185 t/85 2/85 2/85 ' O-- t t/85 'I--t -~,/ ._, 85 4/8_5 5185 5/85 3-t 4/8`.=: 4- t 5/85 F.:ZL;'EIF'T ~."-,P '" ..... _.1.. HOWLEDr:: ~'.n.. B F' A E l(; r'l IF:'"' ..... ,',.IER C Ft E \," R 0 N '-'.) .*_', DISTRIBUTION.: DRILLING W, PA£HER L, ,..IOHN~TON EXXON MOBIL F'I-~ ILL I F'.~ OIL N2K CLERK ,]. RAI'I-iMELL ARCO Alaska, Inc. ii a Subsidiary of AllanticRichfieldCompan¥ Alaska Oil & Gas D A T E: " ~ATE OF 2' 0 I..! ]: 0 UNION K ,fftJL. I N/VAUL. T ARCO Alaska, Inc. Post Office B~,,, 100360 Anchorage, Alaska 99510-0360 Telephone 907 276 1215 April 23, 1985 Mr. C. V. Chatterton Commissioner State of Alaska Alaska Oil & Gas Conservation Commission 3001 Porcupine Drive Anchorage, AK 99501 SUBJECT: Revised Well Completion Reports Dear Mr. Chatterton- Enclosed are revised Well Completion Reports for the following wells' 2G-7 1L-2 1L-3 1L-4 1Q-11 1Q-12 These reports were revised to reflect the cement quantity used when the wells were Arctic Packed. If you have any questions, please call me at 263-4944. Sincerely, J. Gruber Associate Engineer JG/tw GRU6/L11 Enclosures RECEIVED APR 2 5 ] 85 Alaska 0il & Gas Cons. Commission Anchorage ARCO Alaska, Inc. is a Subsidiary of AtlanticRichfieldCompany , /-,~,~ STATE OF ALASKA ~ ALASKA' · AND GAS CONSERVATION CC ~vllSSION WELL COMPLETION OR RECOMPLETION REPORT AND LOG 1. status of Well Classification of Service Well REV I S I ON OIL I~(x GAS [] SUSPENDED [] ABANDONED [] SERVICE [] ,, 2. Name of Operator ~ 7. Permit Number ARCO Alaska, Inc. 84~85 , 3. Address .... '. 8. APl Number P. 0, Box 100360, Anchorage, AK 99510 50- 029-21124 ,, 4. Location of well at surface 9. Unit or Lease Name 487' FSL, 236' FWL, Sec.32, T11N, RgE, UM Kuparuk River Unit At Top Producing Interval 10. Well Number 1091' FSL, 1187' FWL, Sec.32, TllN, RgE, UM 26-7 At Total Depth 11. Field and Pool 1097' FSL, 1194' FWL, Sec.32, T11N, RgE, UM Kuparuk River Field , , 5. Elevation in feet (indiCate KB, DF, etc.) I 6. Lease Designation and Serial No. Kuparuk R~ver 0i l Pool 140' RKBI ADL 25656 ALK 2582 12. Date Spudded 13. Date T.D. Reached 14. Date Comp., Susp. or Aband. J 15. Water Depth, if offshore 116"N°' of Completions 06/19/84 07/11/84 07/15/84 ' ! N/A feet MSLI 1 17. Total Depth (MD+TVD) 18. Plug Back DePth (MD+'rVD) 19. Directional Survey 20. Depth where SSSV set I 21. Thickness of Permafrost 6570'ND,6320'TVD 6465'ND,6215'TVD YES I~X NO [] 1678 feet MDJ 1500'. (Approx) 22. Type Electric or Other Logs Run See attached sheet. · 23. CASING, LINER AND CEMENTING RECORD SETTING DEPTH MD cASING SIZEWT. PER FT. GRADE TOP BOTTOM HOLE SIZE CEMENTING RECORD AMOUNT PULLED , , 20" 91.5# H-40 Surf 105' 30" 278 sx CS II 13-3/8" 72.0# L-80 Surf 2178' 17-1/2" 1000 sx Permafrost E & 450 sx Permafro.$t C 9-5/8" 47.0# L-80 Surf 6312' 12-1/4" 850 sx Class G & 250 s PF "C" 7" 26.0# J-55 Surf 6547' 8-1/2" 250 sx Class G · '.'~1 i '' '' :' ' , ~ ~ - '-~ 'i! 2~. Perforations open to Production (MD+TVD of ToP and Bottom and 25. TUBING RECORD interval, size and number) SIZE DEPTH SET {MD) PACKER SET (MD) - 6360' - 6340, 3-1/2" 6071' 5cj5(~, 6340' - 6322' w/4 spf, 90° phasing 26. ACID, FRACTURE, CEMENT SQUEEZE, ETC. DEPTH INTERVAL (MD) AMOUNT& KIND OF MATERIAL UsED . N/A , 27. N/A PRODUCTION TEST , Date First Production J Method of Operation (Flowing, gas lift, etc.) I ,,, Date of Test Hours'Tested PRODUCTION FOR OIL-BBL GAs-McF WATER-BBL cHOKE SIzE IGA'S-OILRATIO TEST PERIOD II~ I Fl°w Tubing Casing Pressure cALcuLATED` OIL-BBL GAS-MCF WATER-BBL OIL GRAVI'TY-API (corr) Press. 24-HOUR RATE e 28. CORE DATA , Brief description of l ithology, pOrOsity, fractures, apparent dips and presence of oil, gas or water. Submit core chips. Core Description was previously submitted. RECEIVED APR 2 5 1985 Alaska Oil & Gas Cons. Commission Anchorage Form 10-407 JMM2/WC18 Submit in duplicate Rev. 7-1-80 CONTINUED ON REVERSE SIDE 29. '30., .-. · GEOLOGIC MARKERS FORMATION TESTS" · NAME Include interval tested, pressure data, all fluids recovered and gravity, MEAS. DEPTH TRUE VERT. DEPTH GOR, and time of each phase. Top Kuparuk B 6272' 6022' N/A Base Lower Sand 6418' 6168' · , 31. LIST OF ATTACHMENTS . .. .~!CnC ' ' ' : ' 32. I hereby certify that the foregoing is true and correct to the best of my knowledge ., INSTRUCTIONS General' This form is designed for submitting a complete and correct well completion report and log on all types of lands and leases in Alaska. Item 1' Classification of Service Wells: Gas injection, water injection, steam injection, air injection, salt water disposal, water supply for injection, observation, injection for in-situ combustion. Item 5' Indicate which elevation is used as reference (where not Otherwise shown) for depth measurements given in other spaces on this form a..q~d in any attachments. Item 16 and 24: If this well is completed for separate production from more than one interval (multiple comPletion), so state in item 16, and in' item 24 show the producing intervals for only the interval reported in item 27. Submit a separate form for each additional interval to be separately produced, showing the data pertinent t° suCh interval. Item 21' Indicate whether from ground level (GL) or other elevation (DF, KB, etc.). Item 23: Attached supplemental records for this well should show the details of any multiple stage cement- ing and the Iooation of the' cementing tool. Item 27: Method of Operation: Flowing, Gas Lift, Rod Pump, Hydraulic Pump, Submersible, Water In- jection, Gas I njection~ Shut-in, Other~e'xplain, Form 10-407 Well Completion or Recompletion Report and Log REVISED 2G-7 (cont'd) Item 22: Type Electric or Other Logs Run FDC/CNL/GR/DIL/Cal BHCS/GR DIL/SP/GR/LSS/LDT/CNL/EPT/PLD/SHDT DIL/SFL/SP/Sonic/GR FDC/CNL/Cal/GR/BHCS DIL/SP/GR FDC/CNL/GR/Cal/BHCS/SHDT Borehole Televiewer CBL/GR/CCL Gyro Temp/CCL RECEIVED APR 2 5 ]985 Alaska Oil & Gas Cons. Commission Anchorage ... ARCO. Alaska, Inc. ~ · Post Office L 100360 . Anc.horage, Alaska 99510-0360 Telephone' 907 276 1215 · . .....~.} - ~- .. · ", ...... / n 7' I .'7 '-, r' .... ,' .'.;~ r) T .T ,7' .... · :....-'" '~ .... :_"? i 2 C:'" i 5:~,r2'T' 15: · '"'""-' T .'Ii S .:...... '; ]:'..,..""; ,) ~-.. -.. · f--... ,.. .... '~ ,5. ~/'..... T 7.' ,:7 ;7 '..." !: ./1-.! 'Fl / !;' 0 3". ;i; 5' '."iT' .:,. ~-, "r I ,:';'., L.' ! 0 'T' T ,? "'1 "r' T c, .. '.. ! . ,.4. OT 12. 0 T 12. · '"~"1 ' ~_, T ~ ,::. 4.?..' '"'* '"" ]' ','7 '__.: : .~. ~..' ..! :-'~ 'i" T ~i' ... ; ... ~.~ ... : r' B L.I r.:, lr :I1 B !-i F' ' Ii'.' I"1 ,7 TA T I C F'I:.:I:EP FOR F'Fi:AC JOB ,. P ."1", 'T' L.! B' ! ?'.-/. 6; r" 0 I:;: F R A C , ,r.:, BI..J - .~. ' ~ "' 1 £OIJF:CE t,,lr.~] ER WA.:-~,'.I RUN · l.]'.tJ N F' T:, ~ 'l r.:, ..." I F 'r...~ H F' 'P B U "" .... OPEN 'D'SAND/,S':.T,'::',TIC BHP(I.N]iTIAL) F' T '~UBIi'-,,C.;/F' R~.-..F. I-,,~-~C , .t x PREP. .. ~.:. ~-~ ~.~ !., :.- ,~ T A T .T,. C B H F.:' ,?TAT!C BI-.IP/'C;',5:Ar,~D ONLY , _ i., (.. F' F: g F' r..- n R I.'.' F...'."" F'UL.L. DV' ,.-.,/ t'"' '0 I..I F:' Y': U :'7. ,r, i .."~! ?'-:~ ii.". F.' 'A' E.'&NT', r.,.~:,l~ ...e i &.' ..: ... ARCO Alaska, Inc..is a Subsidiary of AtlanticRichlieldCompany 0. r.,:..¢ks, ka Oii& Gas Cons. Commission .., t"1 / i:;. , .................................. · - 'r ,. ','.= CiF' A' /', .... "; ..~ i I' 'i ~ iX. ;.. ,.," ,...: , .V. · i; 0 I"tTMc: :,t. ... ,.... 1( 'I:.,= "" ~;~'"'." · a. , q ,, ? ~' '~ .,.. ~. ARCO Alaska, Inc. ARCO Explor,...on - Alaska Operations Post Office Box 100360 Anchorage, Alaska 99510 Telephone 907 277 5637 HAND CARRIED SAMPLE TRANSMITTAL SHIPPED TO: ALASKA OIL & GAS CONSERVATION COMMISSION 3001 PORCUPINE DRIVE ANCHORAGE, ALASKA 99501 ATTN' MIKE MINDER OPERATOR: ARCO DATE: MARCH.19, 1985 NAME: KUPARUK 2G-7 SAMPLE TYPE: CORECHIPS NUMBER OF BOXES:5 DRY DITCH BOXES SAMPLES REQUESTED TO BE SENT BY DALLAM MASTERSON AT0 1032 SEE ATTACHED LIST SHIPPED UPON RECEIPT OF THESE SAMPLES, PLEASE NOTE ANY DISCREPANCIES AND MAIL A SIGNED COPY OF THIS FORM TO: ARCO ALASKA, INC. P.O. BOX 100360 ANCHORAGE, ALASKA 99510 ATTNL R. L. BROOKS ARCO Alaska, Inc. is a Subsidiary of AtlanticRichfieldCompany ARCO Alaska, Inc. Internal Col ondence Date: MARCH 4, 1985 Subject: KUP 2G-7 CORECHIPS FOR THE STATE OF ALASKA From/Location: EVA ANN ENDICOTT, PALE0 LAB ABV 100 To/Location: DALLAH MASTERSON, ATO 1032 DEPTHS 6323 6324 6325 6326 6327 6328 6329 6330 6331 6332 6333 6334 6335 6336 6337 6338 6339 6340 6341 6342 6343 6344 6345 6346 6347 6348 6349 6350 6351 6352 6353 6354 6355 6356 6357 6382 6383 6384 6385 6386 6387 6388 6389 6390 6391 6392 6393 6394 6395 6396 6397 6398 6399 6400 6401 6402 6403 6404 6405 6406 6407 6408 6409 6410 '64il 6412 6413 6414 6415 6416 6417 6418 6419 6420 6421 6422 6423 6424 6425 6426 6427 6428 6429 6430 6431 6432 6433 6434 6435 6436 6437 6438 6439 6440 6441 6442 6443 6444 6445 6446 6447 6448 6449 6450 6451 6452 6455 6454 6455 6456 ARCO Alaska, Inc. is a Subsidiary of AtlanticRichfieldCompany AR3B-6001 CO~[ENTS/CORRE CTIONS: THIS LIST EXCEPT AS' NOTED IN CO~B~EMTS AND CORRECTIONS, REPRESENTS A COMPLETE LIST OF SAMPLES DUE THE STATE OF ALASKA. PLEASE SIGN AND RETURN THIS FoRM TO' E.A.. ENDICOTT, ABV-100 ARCO Alaska, Inc. ~ Post Office Box 100360 Anchorage, Alaska 99510 Telephone 907 276 1215 February 20, 1985 Mr. C. V. Chatterton Commi s s i one r State of Alaska Alaska Oil & Gas Conservation Commission 3001 Porcupine Drive Anchorage, AK 99501 SUBJECT: 2G-7 Dear Mr. Chatterton' Enclosed are the Well Completion Report and gyroscopic survey for the subject well. If you have any questions, please call me at 263-4944. Sincerely, Gruber ^ssociate Engineer JG/tw GRU4/L163 Enclosures RECEIVED Oil & Gas Cons. Commission ARCO Alaska, Inc. is a Subsidiary of AtlanticRichfieldCompany ,~'- STATE Of ALASKA .... ALASKA,~.. ~.AND GAS CONSERVATION CO,., 41SSlON WELL COMPLETION OR RECOMPLETION REPORT AND LOG ,, 1. Status of Well Classification of Service Well OIL E~X GAS [] SUSPENDED [] ABANDONED [] SERVICE [] 2. Name of Operator 7. Permit Number ARCO Alaska, Inc. 84-85 ,. 3. Address 8. APl Number P. 0. Box 100360, Anchorage, AK 99510 50- 029-21124 4. Location of well at surface ~~'~, 9. Unit or Lease Name 487' FSL, 236' FWL, Sec.32, TllN, RgE, UN,~l VERIFIED j Kuparuk River Unit At Top Producing Interval ~Surf. ~Z~.~' i 10. Well Number 1091' FSL, 1187' FWL, Sec.32, TllN, RgE, UN IB.H. ~ J) ----~,---t 2G-7 At Total Depth' ---~ 11. Field and Pool 1097' FSL, 1194' FWL, Sec.32, TllN, RgE, UM Kuparuk River Field 5. Elevation in feet (indicate KB, DF, etc.) 6. Lease Designation and Serial No. Kuparuk RiVer 0i I Pool 140' RKB ADL 25656 ALK 2582 ,, 12. Date Spudded 13. Date T.D. Reached 14. Date Comp., Susp. or Aband. I 15. Water Depth, if offshore 116. No. of Completions 06/19/84 07/11/84 07/15/84I N/A feet MSLI 1 17. Total Depth (MD+TVD) 18. Plug Back Depth (MD+TVD) 19. Directional Survey 20. Depth where SSSV set I 21. Thickness of Permafrost 6570'MD,6320'TVD 6465'MD,6215'TVD YES r~x NO [] 1678 feet MDI 1500' (Approx) 22. Type Electric or Other Logs. Run See attached sheet. 23. CASING, LINER AND CEMENTING RECORD SETTING DEPTH MD CASING SIZE WT. PER FT. GRADE TOP BOTTOM HOLESlZE CEMENTING RECORD AMOUNT PULLED 20" 91.5# H-40 Surf 105' 30" 278 sx CS II , 13-3/8" 72.0# L-80 Surf 2178' 17-1/2" 1000 sx Permafrost E & 450 sx Permafrost C ,., 9-5/8" 47.0# L-80 Surf 6312' 12-i/4" 850 sx Class G 7" 26.0# J-55 Surf 6547' 8-1/2" 250 sx Class G ., 24. Perforations open to Production (MD+TVD of Top and Bottom and 25. TUBING RECORD interval, size' and number) SIZE DEPTH SET (MD) PACKER SET (MD) 6360' - 6340' 3-1/2" 6071' 5959' 6340' - 6322' w/4 spf, 90° phasing 26. ACID, FRACTURE, CEMENT SQUEEZE, ETC. DEPTH INTERVAL (MD) AMOUNT & KIND OF MATERIAL USED N/A 27. N/A PRODUCTION TEST Date First prOduction [ MethOd of Operation (Flowing, gas lift, etc.) I "'Date of Test Hours Tested PRODUCTION FOR OIL-BBL GAS-MCF WATER-BBL CHOKE SIZE I GAS-OIL RATIO TEsT PERIOD m~ I FlowTubing Casing Pressure cALCULATED =~ OIL-BBL GAs-McF :WATER-BBL OIL GRAVITY-APl (corr) Press. 24-HOUR 'RATE: 28. CORE DATA Brief description of lithology, porosity, fractures, apparent dips and presence of oil, gas or water. Submit core chips. See attached C°re Descri pti°ri' :RECEIVED 2 ]985 Form 10-407 GRU4/WC35 Submit in duplicate Rev. 7-1-80 CONTINUED ON REVERSE SIDE __.~ 29. ' ; 30. · . , GEOLOGIC MARK~:RS FORMATION TESTS · NAME _ Include interval tested, pressure data, all fluids recovered and gravity, MEAS. DEPTH TRUE VERT. DEPTN GOR, and time of each phase. Top Kuparuk B 6272' 6022' N/A Base Lower Sand 6418' 6168' 31. LIST OF ATTACHMENTS lW. ll H~i-nrv (innl,~dinn ~drt~nd~,ml ~,vrn~nnni~ .~,Jrv~.v ~? nnni~s) 32. I hereby~ce;tify that th; f(~regoing~s ;r~e and corre~ct to the be~'t o~ my I~nowledge Signed ~/~zf~_,/ ,Title Associ ate Engi neet Date ~ - INSTRUCTIONS General' This form is designed .for submitting a complete and correct well completion report and log on all types of lands and leases ir. Alaska. '~ Item 1' Classification of Service Wells: Gas injection, water injection, steam injection, air injection, salt water disposal, water supply for injection, observation, injection for in-situ combustion. Item 5' Indicate which elevation, is used as reference (where not otherwise shown) for depth measurements given in other spaces on this form and in any attachments. ,~ Item 16 and 24: If this well is completed for separate production from more than one interval (multiple completion), so state in item 16, and in item 24 show the producing intervals for only the interval reported in item 27. Submit a separate form for each additional interval to be separately produced, showing the data pertinent to such interval. Item 21: Indicate whether from ground level (GL) or other elevation (DF, KB, etc.). Item 23' Attached supplemental records for this well should show the details of any multiple stage cement- ing and the location of the cementing tool. Item 27: Method of Operation: Flowing, Gas Lift, Rod Pump, Hydraulic Pump, Submersible, Water In- jection, Gas Injection, Shut-in,. Other-explain. Well Completion or Recompletion Report and Log 2G-7 (cont'd) Item 22: Type Electric or Other Logs Run FDC/CNL/GR/DIL/Cal BHCS/GR DIL/SP/GR/LSS/LDT/CNL/EPT/PLD/SHDT DIL/SFL/SP/Sonic/GR FDC/CNL/Cal/GR/BHCS DIL/SP/GR FDC/CNL/GR/Cal/BHCS/SHDT Borehole Televiewer CBL/GR/CCL Gyro Temp/CCL RECEIVED Alaska Oil & Gas Cons. Commission Anchorage ADDENDUM WELL: 10/22/84 12/03/84 12/05/84 12/o6/84 2G-7 6460' PBTD RU WL. RU BOP & lubr, tst to 2500 psi. Log rn #1 w/temp/CCL log. Tag btm @ 6464', log f/6464'-5900', POOH & RD. Secure well. Frac well w/total of 325 bbl of gelled diesel, 2000# of 100 mesh, and 11,000# of 12/20 mesh sand. RD & secure well. RU CTU & N~ equip. RIH, circ'g gelled diesel @ .2 BPM. Began pmp'~ No @ 350 scfm. Circ & wsh to 6100'. _Wrk CT bet PBTD & 60~0', pmp lost suction; unable to unplug, POH. Secure well. 6490' PBTD ' RU WL, press tst lubr. GIH & tag @ 6484', POH, RD Otis. Drillin~ Superintendent RECEIVED Alaska Oil & Gas Cons. Cornmissiorl Anchorage Date ARCO 011 and Gas Company Well History - Initial Report - Dally Inetfuctiofle: Prepare and ~ubmit ~ "~ ~ Ua the .flr~, Wedne~dar/ after a well ia spudded or workover operetlone are lltllrted. Daily work prior t~gll~lttg glloul~Oe ~ummarlZeO on the fofwl giving in¢luelve datea only. District Alaska Field Kuparuk River Auth. or W.O. no. AFE 902179 ICounty, 13ad~% or bo;ough I State North Slope Borough teaae or Unit ADL #25656 Title Drill, Complete, Core & Perforate Alaska Well no. 2G-7 Operator ARCO Alaska, Inc. JO&re JHour 6/19/84 0130 Hrs. i^.co w.,, 56.24% Prior etetue if a W.O. Spudded or W.O. begun Spudded Date and depth as of 8:00 a.m. 6/19/84 6/20/84 6/21/84 6/22/84 6/23/84 thru 6/25/84 Complete record for each day reported 20" @ 105' 750', (645'), Drlg Wt. 9.8, PV 19, YP 36, PH 8, WL 13.8, Sol 9 NU riser. Accept rig @ 1900 hfs 6~18/84. hrs, 6/19/84. Drl 17½" hole to ~50'. Spud well @ 0130 20" @~105' 2205', (1455'), C&C f/csg Wt. 9.8, PV 18, YP 22, PH 7, WL 14.2, Sol 8 Drl & surv 17½" hole to 2205', CBU, short trip. RU & rn FDC/CNL/GR/DIL/CAL f/2197' WL TD - surf. Log BHCS/GR f/2182' WL - surf. C&C f/csg. 13-3/8" @ 2178' 2205', (0'), Tst BOPE Wt. 9.0 (Mx'g mud) _ /100~ ,, C&C mud, POOH. RU,& rn 53 ~ts, 13-3/8 , 72#, L-80 BTC csg w/FS @ 2178', FC @ 2090 . M&P~sx lead "E" cmt@ 12.3 ppg, followed by 450 sx tail "C" cmt@ 15.6 ppg. Displ using rig pmp, bump plug.. CIP @ 1815 hrs, 6/20/84. ND diverter lns. Perform top job w/50 sx C1 "G". NU BOPE &tst. 13-3/8" @ 2178' 2359', (154'), Core #4 Wt. 8.9, PV 8, YP 8, PH 7.0, WL 8.2, Sol 3 Compl BOPE tst. RIH'w/BHA to 2085', tst csg to 1500 psi. DO FC, cmt, FS + 10' new hole. Conduct formation tst to 12.5 ppg EMW. Drl 12¼" hole f/2218'-2327', POOH, PU core bbl. Core #1, 2327'-2356', rec'd 29'. Core #2, 2356'-2357', rec'd 1'. Core #3 2357'-2358', rec'd 2~'. Core #4, 2358'-2359', incompl. 13-3/8" @ 2178' 2800', (441'), Logging WS Wt. 9.2+, PV 11, YP 9, PH 6.8, WL 6.2, Sol 5 Core #4, 2359'-2377'. Core #5, 2377'-2407'. Core #6, 2407'-2437'. Core #7, 2437'-2467'. Core #8, 2467'-2486'. Core #9, 2486'-2516'. Core #10, 2516'-2546'. Core #11, 2546'-2576'. Core #12, 2576'-2604'. Core #13, 2604'-2635'. Core #14, 2635'-2651'. Core #15, 2651'-2681'. RIH w/9-7/8" bit, afl 2681'-2800', CBU, POOH. RU & log DIL/SP/GR/LSS/GR/ LDT/CNL/GR/EPT/PLD/GR/SHDT/GR f/2801'-2100'. RECEivED i' ~"' ~"~ 2 1 ]985 The above 15 correct Signature 6/28/84 ARCO Oil and Gas Company Daily Well History--Interim Instructions: This form is used during drilling or workover operations. If testing, coring, or perforating, show formation name in describing work performed. Number all drill stem tests sequentially. Attach description of all cores. Work performed by Producing Section will be reported on "Interim" sheets until final completion. Report official or representative test on "Final" form. 1) Submit "Interim" sheets when filled out but not less frequently than every 30 days, or (2) on Wednesday of the week in which oil string is set. Submit weekly for workovers and following setting of oil string until completion. District Field Alaska I County or Parish IState North Slope Borough ILease ADL #25656 or Unit Alaska Kuparuk River IWell no. 2G-7 Date and depth as of 8:00 a.m. 6/26/84 6/27/84 6/28/84 6/29/84 6/30/84 thru 7/02/84 The above is correct Complete record for each day while drilling or workover in progress 13-3/8" @ 2178' 3333', (533'), Navi-Drl Wt. 9.3, PV 9, YP 14, PH 9.0, WL 6.4, Sol 6 Log SHDT/GR f/2801'-2100'. Rn sidewall cores. Rm 2327'-2800'. Drl 12¼" hole to 2853', Navi-Drl to 3333'. 2801', Assumed vertical 3050', 5.6°, N50.2E, 3049.70 TVD, 12.15 VS, 7.79, 9.35 13-3/8" @ 2178' 4276', (943'), Drlg Wt. 9.5, PV 15, YP 17, PH 9.5, WL 5.2, Sol 8 Drl & surv 12¼" hole to 4276'. 3305', 13.1°, N42.5E, 3301.31TVD, 53.34 VS, 36.39N, 39.33E 3906', 29.1°, N57.1E, 3860.69 TVD, 268.63 VS, 173.59N, 205.41E 4235', 39.0°, N59.7E, 4133.28 TVD, 451.86 VS, 270.11N, 362.31E 13-3/8" @ 2178' 5073', (797'), POH Wt. 9.6, PV 21, YP 25, PH 9, WL 6, Sol 9 Drl & surv 12¼" hole to 5073'. 4542', 32°. N54-1/2E, 4383.21TVD, 629.56 VS, 366.94E, 511.99E 4957', 21.9°, N59.3E, 4754.21TVD, 814.30 VS, 471.22N, 664.84E 13-3/8" @ 2178' 5913', (840'), Drlg Wt. 9.6, PV 12, YP 8, PH 9.5, WL 4.2, Sol 9 Fin POH, chg BHA. TIH, wsh 4825'-5073', drl 12¼" hole f/5073'-5913'. 5192', 19.5°, N58.5E, 4974.04 TVD, 896.85 VS, 514.13N, 735.97E 5475', 18.8°, N61.3E, 5241.38 TVD, 988.91VS, 560.69N, 816.29E 5756', 12.4°, N58.5E, 5512.03 TVD, 1063.85 VS, 598.59N, 881.67E 13-3/8" @ 2178' 6313', (400'), RIH w/9-5/8" csg Wt. 10.3, PV 15, YP 8, PH 10.5, WL 4.4, Sol 13 Drl & surv 12¼" hole to 6313', circ f/logs. RU & rn DIL/SFL/GR/SP, unable to get past 4250'. Make wiper trip to 6313'. Re-rn DIL/SFL/SP, unable to get past 6274', POH. RU SOS, rn DIL/SFL/SP/Sonic/GR f/6301' WLM-13-3/8" shoe. Rn FDC/CNL/CAL/GR. Rn BHCS/CNL/GR. Chg top rams to 9-5/8". RU & begin rn'g 9-5/8", 47#, L-80 csg. 5918', 8.7°, N54.4E, 5671.29 TVD, 1093.44 V$, 614.98N, 906.39E 6285', 3.7°, N56.1E, 6035.99 TVD, 1133.62 VS, 637.16N, 940.02E P, i VED $ign~ _ Drilling, Pages 86 and 87 IDate ITitle 7/18/84 ~l~~ ~uperint endent I -, ' ARCO Oil and Gas Company,~, Daily Well History--Interim Instructions: This form is used during drilling or workover operations. If testing, coring, or perforating, show formation name in describing work performed, Number all drill stem tests sequentially. Attach description of all cores. Work performed by Producing Section will be reported on "Interim" sheets until final completion. Report official or representative test on "Final" form. 1) Submit "Interim" sheets when filled out but not less frequently than every 30 days, or (2) on Wednesday of the week in which oil string is set. Submit weekly for workovers and following setting of oil strin§ until completion. District Field Date and depth as of 8:00 a.m. I County or Parish Alaska North Slope Borough I tease or Unit Kuparuk River ADL #25656 Complete record for each day while drilling or workover in progress 7/03/84 7/04/84 thru 7/05/84 7/06/84 7/07/84 thru 7/09/84 The above is correct 7/10/84 State Alaska Well no. 2G-7 9-5/8" @ 6312') 6225' FC, Cln pits f/Oil Faze Wt. 10.3, PV 15, YP 8, PH 10.5, WL 4.4, Sol 13 Fin rn'g 158 its, 9-5/8", 47#, L-80 BTC csg w/FC @ 6225 (top) & FS @ 6312' (btm). Cmt w/600 sx C1 "G" w/3% KC1, 8% gel, 3% Halad-24, .25% NFP, 2% HR-7, followed w/250 sx C1 "G" w/l% CFR-2, 5% KC1 & 3% Halad-24. Displ using rig pmp, bump plug. CIP @ 1400 hrs, 7/02/84. Chg rams f/9-5/8" to 5", tst BOPE @ 250/3000 psi. 9-5/8" @ 6312' 6382', (69'), POOH w/core bbl #1 Wt. 10.3, PV 24, YP 21, WL 4.8, Sol 24 Fin cln'g pits. TIH w/8½" BHA, tag FC, tst csg to 3000 psi. DO FC, cmt, FS + 10' new formation to 6323'. Conduct formation tst to 12.5 ppg EMW. Fill pits w/10.3 ppg Oil-Faze, C&C, POOH. RIH, core #1, 6323'-6382'. 9-5/8" @ 6312' 6457', (75'), Logging Wt. 10.3, PV 21, YP 22, WL 5.0, Sol 24 Core #2, 6382'-6416'. Core #3, 6415'-6457'. RU Schl, rn DIL/SP/GR f/6456'-6312'. Rn FDC/CNL/GR/CAL (in progress). 9-5/8" @ 6312' 6382', (0'), POOH f/televiewer Wt. 10.3, PV 21, YP 21, WL 4.8, Sol 24 Log FDC/CNL/GR/CAL/BHCS/GR/SHDT/GR. RIH, spot 40 bbls 10.3 ppg NaC1/NaBr pill, POOH. RU Schl, rn borehole ultrasonic televiewer. PU Lynes impression pkrs & orient same. RIH w/pee wee gyro, inflate pkr assy w/1000 psi, hold 1 hr, bled press to 0 psi, POOH w/gyro, wrk pkr assy free, top 2 pkr's did not retract fully, POOH w/pkr assy. RU frac equip, frac stage #1. RIH w/seismometer & gyro to 6456', pull up to 6400', monitor hole w/seismometer. Rn stage 2, 3 & 4 frac. POOH, RD surf equip. RIH w/BHA to 6410', rm to btm, CBU & cond hole. Spot 40 bbls NaC1/NaBr pill, POOH. 9-5/8" @ 6312' 6382', (0'), Rig up SOS to rn Gyro Wt. 10.3, PV 21, YP 21, WL 5.0 Sol 25 Rn borehole televiewer f/6446'-6313'; data not good. Rn 8-1/2" bit, rm f/6390'-6457'. Condition mud, pmp 60 bbl 10.3 ppg NaC1/Br, spot a balance plug. RU SOS, rn borehole televiewer f/6446'-6313'; data good. PU 4 Lynes impression pkr assy. RIH to 5600', could not circ. RIH to 6384'. RU SOS. Signature For form preparation and distribulion see Procedures Manual Section 10, Drilling, Pages 86 and 87 IDate ITM 7/23/84 Drilling Superintendent JtJaska 0il & Gas Cons. Commission Anchorage ARCO Oil and Gas Company Daily Well History--Interim Instructions: This form is used during drilling or workover operations. If testing, coring, or perforating, show formation name in describing work performed. Number ali drill stem tests sequentially. Attach description of all cores. Work performed by Producing Section will be reported on "Interim" sheets until final completion. Report official or representative test on "Final" form. 1) Submit "Interim" sheets when filled out but not less frequently than every 30 days, or (2) on Wednesday of the week in which oil string is s_et. Submit weekly for workovers and following setting of oil string until completion. District . [CountyorParish IState Alaska North Slope Borough Field ~Lease or Unit Kuparuk River I ADL #25656 Date and deptl~ as of 8:00 a.m. 7/11/84 7/12/84 7/13/84 Alaska IWell no. 2(;-7 Complete record for each day while drilling or workover in progress 9-5/8" @ 6312' 6382', (0'), Rig up SOS to rn Gyro Wt. 10.3, PV 20, YP 20, WL 6.5 Sol 25 Orient EW gyro. RIH & lock gryo in DOT sub. Pressure Lynes impression pkrs to 500 psi f/30 min. POOH w/ gyro, drop 1.5" ball, circ, POOH w/impression pkrs. RIH w/ 8-1/2" BHA to 6415'. Drlg f/6457'-65__~', short trip to 9-5/8" shoe. Circ f/7" liner, POOH. Rn 538', 7", 26# csg w/ BOT FC, FS. Lnd colr & lnr hgr on 5", 19.5#, DP. Circ. @ 548', 6300' & 6570'. 7" @ 6547' 6504' FC', Circ WOC Wt. 10.5, Oil faze M&P 250 sx Class "G" w/l% CPF-2, 5% KCL, .3% Halad 24 @ 15.8 ppg. Displ w/Oil-Faze mud using rig pmps, bump plug. CI? @ 0753 hrs. 7/ll/84. TIH to 4500, WOC. TIH to 5735', CBU. TOL @ 6010', LC @ 6465', FC @ 6504'. Tag @ 5800' (190' f/TOL). 7" @ 6547' 6465' PBTD, Cln Pits Wt. 10.5, NaC1/NaBr TIH. Drl cmt f/5641'-6010'. Circ. POH CO BHA. TIH to TOL @ 6010'. Drl cmt f/6010'-6130'. TIH to LC @ 6465'. Pmp diesel spacer, followed by 10.3 NaC1/NaBr. Tst 7 x 9-5/8" liner lap w/3000 psi f/30 min, OK. Cln pits. The above is correct Drilling, Pages 86 and 87 IDate 7/23/84 ITM Drilling Superintendent ARCO Oil and Gas Company Daily Well History-Final Report Instructions: Prepare and submit the "Final Report" on the first Wednesday after allowable has been assigned or well is Plugged, Abandoned, or Sold. "Final Report" should be submitted also when operations are suspended for an indefinite or appreciable length of time. On workovera when an official teat is not required upon completion, report completion and representative test data in blocks provided. The "Final Report" form may be used for reporting the entire operation if space is available, District IC°unty or Parish Alaska Field ~Lease or Unit Kuparuk River Auth. or W.O. no. ~Title AFE 902179 Operator A.R.Co. W.I. ARCO Alaska, Inc. Spudded or W.O. begUnspudded Date IAccounting State cost center code Alaska North Slope Borough ADL #25656 Well no. 2G-7 Drill, Complete, Core & Perforate Date and depth as of 8:00 a.m. 7114184 thru 7/15/84 Complete record for each day reported 56.24% 6/[9/84 I otal number of wells (active or inactive) on this cst center prior to plugging and I bandonment of this well I our i Prlor status if a W.O, I 0130 Hrs. 7" @ 6465' 6071' Tbg Tail, RR 7.3 Kuparuk Crude in ann & tbg Fin cln'g Oil-Faze f/pits, inj contaminated diesel dn 13-3/8" x 9-5/8" ann. POH, LD DP. Chg top set rams to 3½". Log CBL/GR/CCL f/6466' WL TD-6000'. Rn gyro/CCL f/TD-surf. RU & perf 6360'-6340' & 6340'-6322' @ 4 SPF/90° phasing. Rn 190 jts, 3½", J-55, 8RD EUE tbg &lnd. ND BOP, NU &tst tree to 250/3000 psi. Displ well to Kuparuk crude. RR @ 0630 hrs, 7/15/84. 44" BPV in Place - Final SITP @ 750 psi - SSSV Closed Old TD New TD I PB Depth 6570' (7/11/84) I 6465' Released rig Date IKind of rig 0630 Hrs. 7/15/84 I Rotary Classifications (oil, gas, etc.) Type completion (single, dual, etc.) Oil Single Producing method Official reservoi.r name(s) Flowing Kuparuk Sands~ Potential test data ~ ~"~ ~" C Ii" i Well no. Date Reservoir Producing Interval Oil or gas Test time Prod~-~tl~3n ' "'- ~ ~-,.. tO, II ,j~ t~t Gas per day Pump size, SPM X length Choke size T.P. O.P, Water % GOR '" corrected The above is correct Signature _ ITitle Drilling Superintendent $ UB-$ URFA CE DIRECTIONAL SURVEY F~ UIDANCE r~ONTINUOUS ~'-~ OO L Company Well Name. Field/LoCation ATLANTIC RICHFIELD COMPANY 2G-7 (S32.TllN. Rq~. I!~':~ · I<IIPARIlK: NORTH SI flPF. Al A<:;K'~ Job Reference No. 69364 Logged By: MCBRIDE Date 26-SEP-84 Computed By: HARTNUP GCT DIRECTIONAL SURVEY CUSTOMER LISTING ARCO ALASKA, INC, 2G-7 KUPARUK SLOPE, ALASKA SURVEY DATE{ 13-JUL-84 ENGINEER: NCBR1DE METHODS OF COMPUTATION TOOL ~O~ATION{ TANGENTIAL- averaged deviation and azimuth INTERPOLATION{ LINEAR VERTICAL SECTION{ HORIZ, DIST, PROJECTED ONT(] A TARGET AZIMUTH Of' ~ORTH 52 DEG 29 MIN EAST ARCO ALASKAf INC, 2G-7 KUPARUK N, SLOPg~ ALASKA COMPUTATION DA~E~ 25-8EP-84 PAG£ 1 DATE OF SURVEY1 13-,JUL-84 KELLY BUSHING EI~EVATIONI 140,00 FT ENGINEER: MCBRIDE ,INTERPOLATE[) VALUES FOR EVEN 100 FEET OF MEASURED DEPTH TRUE SUB-SEA COURSE MEASURED VERTICAL VERTICAL DEVIATION AZIMUTH DEPTH DEPTH DEPTH DEG MIN DEG ~IN 0 O0 -140 )0 0 0 100 O0 -40 ~1 0 0 O0 60 O0 O0 160~( O0 200, 99 459,99 99 559,99 99 659~99 98 759,98 0 O0 100 O0 200 O0 tO0 O0 O0 O0 500 O0 60 O0 70~ O0 800 O0 900 O0 98 98 9b~,98 98 I059.98 98 1159"98 97 1259.97 97 i159.97 96. 59.96 96 1~59,96 95 1 59,95 95 1759,95 1000 O0 40 15o0 1600 1700 1800 1900 2OO 300 4OO 499 599 699 799 899 999 O0 1099 O0 1199 O0 1299 O0 1399 0 1499 ~0 1599 O0 1699 N 0 0 E N 43 46 N 36 25 862 S 42 38 g $ 89 28 g S 73 33 g S 54 4 E N 86 45 g $43 7 E 2000 O0 1999,95 1859,95 0 24 5 1959.95 0 25 4 2059,94 0 23 4 2159'94 0 17 4 2259~94 0 14 94 2359,94 0 17 94 2459,94 0 24 93 2559,93 0 31 93 2659,93 0 20 93 2759,93 0 37 ~§ 2099 2199 O0 2299 O0 2399 O0 2499 O0 2599 O0 2699 O0 2799 O0 2899 S 28 28 w 8 31 39 W $28 8 w S 41 0 ~ S 16 18 v, $ 30 51{ ~ S 2 3 E S 4 4 w S 59 38 w a 88 27 ~ 2300 2400 2500 O0 2800 2900 3 39 N 48 39 g 6 48 a 51 11E 9 52 N 47 8 E 37 3156,37 12 44 N 42 53 g 41 3253.41 15 18 N 48 16 E 21 3349,21 18 0 N 50 32 E 54 3443,54 20 32 N 49 6 g 49 3536,49 22 40 k 50 45 g 82 3627,82 25 28 N 53 4 E 76 3716.76 28 48 N 54 59 E · 3 O0 3400 3500 3600 3700 3800 3900 3000.00 2999.85 2659,85 O0 3099 41 2959,41 3056,35 O0 3198 35 O0 3296 O0 3393 O0 3489 O0 3583 O0 3676 O0 3767 O0 3856 VERTICAL DOGLEG RECTANGUbA~ COORDINATES HORIZ DEPARTURE ;SECTION ~EVERI~Y NORTH/SOU~H EA;ST/NE~ D A~MU~H FEET DEG/IO0 FEET FEET F DEG 0,00 -0,08 -0,06 -0,11 -0,18 0o~2 O, 2 0.~$ 1,52 1,85 0 O0 0 15 0 09 0 0 14 10 0 16 0 O0 N ' 0 56N 0 231~ 0 04 N 0 09 N 0428 0 O0 E 0 57 ~ 0 40 ~ 024~ I 09 E 49~ 2 30 E 2 89E o 0 E ° 0 2 57 E 2 gg S 75 48 E 1.78 2.11 1.76 1,26 0.67 '0,2! '1,03 '1,76 -2,26 -2.83 1,42 0,94 0 67 0 4 0 0 oI o 1.20 8 1,00 S i,15 8 184;5 2 62 S 3 47 S 4558 5248 6,12 S 6,88 $ 3 17 E 3 43 E 3 11 E 3 O0 g 2 86 E 2 40 E 2 20 E I ~0 E , 85 E ,72 g 32 ,S 69 38 E 52 S 58 29 E 88 8 47 27 E 22 S 3442 E 54 8lg 0 E '3,49 -4,½6 -4 8 ,15 -5.56 -5 94 ,47 '7,10 '7.60 "7,88 0.10 0,~9 O, ? 0,80 1,16 1,16 1,51 0,61 0,12 3,05 7,56 $ 1,41 E 8,18 8 1.04 E 8 8,80 S 0,74 E 8 9,40 S 0,72 E 9 9,92 $ 0,61 g 9 s t ,99 S 0 E 10 11 ,61 8 0,04 ~ 12.23 S 0.55 ~ 12 7 69 S 10 33 E 25 8 7 14 E 83 S 4 47 E 30 8 99 8 Oo 24 S 2 ~3 W '4,39 4,80 19,25 38,78 62.71 91.33 124,45 161,28 201,96 247,63 3.69 3. . 35 .10 3,15 9 41 S 1.70 E 9,57 S 10 13 E 5 79 N 19 82 E 2 , 19 88 N 33 63 E 39,06 h 5 25 E 36 84 N 50 77 E 62 73 N 54 2 E 55 12 ~ 72 82 E 91 33 N 52 52 E 76.47 ~ 98o18 E 124 45 N 52 5 E 100,34 a 126,29 E 161 30 a 51 31E 152,21 N 195.33 E 247 b3 N52 4 E ARCO AbASKA~ ZNC. 2G-7 KUPARUK Ne SLOPEr ALASKA COMPUTATION DATE~ 25-$EP-84 DATE OF SURVEY1 13-dUb-84 KELLY BUSHING ELEVATIONI ENGINEER: MCBRIDE ~NTERPOLATED VALUES FOR EVEN 100 FEET OF MEASURED DEPTH .. TRUE SUB-SEA CO[JRSE MEASURED VERTICAL VERTICAL DEVIATION AZIMUTH DEPTH DEPTH DEPTH DEG 4000 O0 3943 4t00 O0 4026 O0 4106 O0 4184 O0 4263 O0 4345 O0 4431 O0 4518 O0 4609 O0 4700 4200 4300 O0 4600 4700 O0 4793 O0 4887 O0 4981 O0 5076 O0 5170 O0 5265 O0 536~ O0 545 O0 5554 O0 5653 07 55 3886,5 5!:~:~i<,~ :!i14i a 57 29 g 16 4044,1639 17 N 59 21 E 29 4123,29 35 55 N 59 24 E 90 4205,90 ~5 429~ 25 30 9 h 59 6 E 8 4370 ~27 20 N 59 17 E 98 4560,98 2229 N 59 29 83 46538 3 21 4 63 4747:63 19 34 87 4841 87 19 30 14 4936 14 19 16 59 5030 59 19 1 19 5125 19 18 32 58 522058 16 25 O0 5513 O0 2 soooo 5 0 5i00 5300 540(~ 550 5600 5700 5800 5900 , PAGE: :'2 140,00 FI VERTICAL, DOGLEG RECTANGULAR COORDINATES HORIz DEPARTURE SECTION SEVERITY NORTH/SOUTH EAST/W~$T IMUTH FEET DEG/IO0 FEET FEET FEE, MXN 298,03 352.91 412.25 475.16 535,84 591,77 5O 643,49 34,28 3 19 3 33 3 22 2 49 3 25 2 80 1,75 31 6000 O0 5751,92 5611,92 7 36 oo 6200 O0 5950,74 5~10, 4 58 ~{00 O0 6050.43 591~ 43 3 45 oo oo oo oo N 59 53 E N 61 5 E 844 N 60 47 E 877 N 60 34 E 910 N 60 42 E 943 n 60. 49 E 975 N 60 10 E 1004 N 5913 E 1030 810 08 180 71 N 237.00 E 298 210 81 N 283.08 E 35 333 ,76 g 388,22 E 242 274 3O5 334 361 385 407 427 40 E 23 N 41 E 60 N 47 43 E 75 N 440,81 E 53 15 E t~ N 489.28 E 59 !i~ 38' r-) ~ 534,03 E 64 56 84 N 575.56 E 692 9 ~,' 94 N b46.32 E 775 15 39 E 1,33 39 0,63 49 0,40 O0 N 737 51 0.35 496 766 05 0.29 512.59 N 795 13 2,04 528,46 N 823 83 2,19 543,14 N 84'9 67 2,45 556,34 N 872 , 576,81 N 90 N 59 23 E 1052 38 N 58 30 g 1070:50 N 57 39 E 1085,09 N 59 21E 1096,94 N 60 il E 1106,48 N 59 55 E 1114,20 N 52 10 E 1120.66 ,22 N 52 10 E 1127 463,75 N 708 51 E 480, ,40 N 75 E 880 80 E 913 39E 946 65 E 978 g 1034 OB E 1056 77 E 1074 59 N E 68 n 2 E 1,51 I,08 ,40 O, 0,00 0,00 584,58 N 919 20 E 1089,33 N 57 32 g 590.87 N 929 31E 110!.24 N 57 )3 g 595,75 N 937 59 E 1110,85 N 5734 E 599.52 N 944 42 E 1118'64 , 57 ~5 £ 6 03,33 N 949 65 E 1125.10 N 5734 E 610.17 N 958,46 g 1136,20 N 57J1 ARCO ALASKA, INC, 2G-? KUPARUK N, SLOPEr ALASKA TRUE COMPUTATION DATE: 25-$EP-84 i ENGINEER: MCBRIDE iNTERPOLATED VALUES FOR EVEN 10()0 FEET OF MEASURED DEPT SUB-SEA COURSE PAGE DATE OF SURVEY1 !3-dUb...84 KELLY BUSHING EbEVATIONI 140,00 V~RTICAL DOGLEG RECTANGULAR COORDINATES HOR~Z, DEPARTURE MEASURED VERTICAL VERTZCA. b DEVXATZON AZIMUTH SECTION SEVERITY NORTH/SOUTH EAST/WEST DEPTH DEPTH DEPTH DEG MIN 0 O0 0,00 -~40,00 0 0 1000 O0 999,98 59, ooo oo 2000 O0 2999,85 28 , 4000 O0 3943,07 3803,07 ~ 4~ 5000 O0 4793'83 4653,83 6000 O0 5751,92 56½~,9~ 7 36 65'70 O0 6319.85 61 ,8 3 .:4.5 UTH' DEG MIN FEET DEG/IO0 FEET FEET FEE~ N 0 0 E 0.00 0 O0 S 55 12 E 1,78 1:42 $ 28 28 ~ -3,49 0,10 N 48 39 E -4.39 3,69 N 56 8 g 298.03 3,19 N 57 E I0 ,09 , N 52 10 g 1131,81 0,00 9 41 S 1,70 E 9 180 71 N 237,00 E 298 610 17 N 95~,46 E 1136 'ARCO ALASKA, INC, 2G'7 KUPARUK N, SLOPE, ALASKA COMPUTATION DATE~ 25-~EP-84 ,. t' PAGE 4 DATE OF SURVEY1 13-dUb-84 KELLY BUSHING ELEVATZONI ENGINEER: MCBRIDE INTERPOLATED VALUES FOR EVEN 100 FEET O~~ SUB-SEA DEPTH TRUE SUB-SEA COURSE; MEASURED VERTICAL VERTICAL DEV/ATION AZIMUTH DEPTH DEPTH DEPTH DEG MIN DEG 0 O0 40 O0 140 O0 240 O0 40 O0 40 O0 540 Ol 640 O1 740,01 840,02 O0 0 10 1o 00~ ~ 0 10 Igg:oo o 00: 0 2 400,00 500,00 600..00 700,00 8oo'oo O0 900'00 O0 1000,00 0 1100,00 0 1200.00 0 1300.00 0 1400;00 O0 1500,00 O0 ,00 O0 ~600 700,00 O0 1800.00 O0 1900'00 O0 2000,00 O0 2100'.00 O0 2200.00 O0 2300 O0 O0 2400 O0 O0 25O0 O0 O0 2600 O0 O0 2700,00 N 0 0 N 59 4~ N 31 22 W h 40 18 W S 17 39 E S69 4E 0 30 N 85 58 E 022 ,932 0 29 8 86 16 E 0 23 S 76 38 E 0 18 ;5 29 33 E 0 14 N 46 4b E 0 13 lS 71 39 W 0 23 8 7 23 w 0 28 S 6 24 W 0 33 8 33 14 W 0 39 S 12 58 ~ 0 27 8 33 21 W 0 32 IS 6 29 g 028 S 6 3 N 0 29 S 17 19 0 25 024 S 213 0 27 0 22 S 26 8 0 18 IS 47 8 W 0 27 S 22 49 0 23 IS 42 50 W 0 24 S 5 38 E 0 17 864 6 W 940 1040 4O 1340 1440 1540 1640 1748 184 0 O0 40 O0 140 O0 240 O0 340 0 440 ~0 540 O0 640 O0 740 O0 840 O0 N 31 3 E a 52 7 E N 49 7 E N 44 46 E N 44 52 E N 50 43 E N 49 55 E N 49 46 E a 52 24 E N 54 40 E 02 940 O0 02 1040 02 1140 02 1240 02 1340 03 1440 03 1540 04 1640 04 1740 05 1840 1940 05 1940 2040 2140 2240 2340 2440 2540 2640 2740 2840 05 2040 05 2140 06 2240 06 2340 06 2440 06 2540 07 2640 07 2740 07 2840 2940 08 2940 O0 2800,00 3040 3040 O0 2900,0'0 3140 3448 3553 3660 3769 3880 140,00 FT VERTICAL DOGLEG RECTANGULAR COORDINATES HORIZ! DEPARTURE SECTION ISEVERITY NORTH/ISOUTH LAST/WEST FEET DEG/IO0 FEET FEET FEE~' 'D~G MXN 0 O0 0 11 0 08 0 11 0 52 0 52 0 O7 0 10 o,12 1.08 0,00 0,03 0,25 0,49 10 0,06 0.08 0,49 0,48 0 o0 ° 0 0 46 0 57 0 21 0 59 1,25 1,81 2,58 0.00 -0.02 -0.08 -0.06 11 0.50 0'95 1.14 1,76 0 3~ 0 28 o 0 0 I0 0,57 0,19 0.65 0 ,92 0'99 1,39 2,17 2 89 3 91 4 86 5 57 6 45 3 33E 2 64 E 2 28 E 2 14 E I 69 E 1 95 E 1.86 1.92 2,03 1.57 1.03 0,33 -0,57 -1,27 -2.05 -2.38 1.06 7.17 S 1.55 g 7,33 S 12 12 E 0,14 7,82 S 1.27 E 7,93 S 9 l) E 0,77 8,4~ S 0,~3 E 8.53 $ 615 E o. 4 , 0,88 10;02 $ 0,50 E 10,0{ $ ~ 4{ ~ 1,21 10,5i S 0,25 E 10,51 S 20 ~ ) s o.o, o 0,27 1 31S 0,41 k 32 $ 1 54 N -3.14 -3,76 -4.42 -4,95 -5.36 -5,7! -6.20 -6,65 -7.30 -7.82 3 25 2 97 2 74 2 54 2 32 2 O8 ,96 .35 1.48 8 0,20 k 11,48 8 0 ~ W 17,48 8 4,08 E 8,52 IS 28 E 0.32 S 12.97 E 12 97 ~ 88 ~ i 11,17 N 25.39 E 27 74 66 27,36 N 40,73 E 49 07 N 56 9 E 45,46 N 60.97 E 76 05 N 53 I E , 48 O~ 146,97 ~ 187,88 23 ,54 I 48 84 3340 O0 3200,'00 13 47 47 3440 O0 3300,00 16 36 65 3540 O0 3400,00 19 31 58 3640 O0 3500,00 21 49 31 3740 O0 3600,00 24 34 93 3840,00 3700.00 28 12 '7.15 '1.32 10.09 26.94 48.97 76.04 189~01 238.53 ARCO ALASKA, INC, 2G'7 KUPARUK Ne SLOPE, ALASKA TRUE SUB-GEA COURSE MEASURED VERTICAL VERTICAL DEVIATION AZIMUTH DEPTH DEPTH DEPTH DEG 41 4242 437½ 449 4610 4942 5049 40 3940 46 4040 67 4140 04 4240 97 4~40 10 4 40 79 4540 82 4640 16 4740 36 4840 0 80 O0 4000 O0 4100 oo 4200 O0 4300 O0 4400 O0 450O O0 4600 O0 4700 ENGINEERI MCBRIDE ~NTERPOLATED VALUES FOR EVEN 100 FEET OF SUB-SEA DEPTH VERTICAL DOGLEG RECTAhGUEAR COORDINATES HORIZ, DEPARTURE SECTION SEVERITY NORTH/SOUTH EAST/WE~T ~ FEET DEG/IO0 FEET FEET FEET PEG 296.16 362,36 438.88 518,76 587,98 747 72 789 09 827,37 3 10 3 60 1 71 3 63 2 76 66 1 $5 ! 69 1,¢6 179 66 N 235 44 E 296 15 55 $2 391 41 90 N 291 99 N 356 99 N 426 52 N 486 71N 538 34 N 584 86 N 624 03 N 660 36 N 693 Oe E 362 77 E 439 O0 E 519 O0 E $88 E 70~ 16 E 749 07 g 791 49 E ~29 63 u 56 140,00 FT ~ N 56 6 E ! N 57 43 g O0 II 24 N 59 19 E 00 i:~ 55 N 59 21 E 00:/ 57 N 59 6 E oo 20 . oo 39 E 20 E 3~ E tt [ 472 75 N 724 155 57 4940 O0 4800.00 19 35 ~261 69 5040:00 4900 O0 19 29 5000: 547~ 5340,00 ,00 53 557 ,00 58 0 5~8~ 544 ,0o 5540,00 5886 5640,00 5987 5740000 5600.0 46 6o,e ,4o.oo ?oo"o°o O0 19 9 39 5100 18 53 5200,.00 16 51 37 ' 0 14 10 oo , O0 I 57 82 5500,00 9 39 97 7 74 b 5 6189 22 5940 O0 5800.00 5 6 6289 55 6040 O0 5900'00 - 3 55 6389 76 6140 O0 6000.00 3 45 6489 98 6240 O0 6100000 3 45 65?0 O0 6319 85 6179,85 3 45 N 60 44 g 862.78 N 60 29 E 897.91 N 60 24 E 932 58 N 60 39 E 966:65 N 60 28 E 998 74 N 59 10 E 1026 46 N 59 17 E 1049 33 N 58 46 E 1068 33 N 57 48 E 10~3,48 N 59 11E 1095,77 N 59 47 g 1105,54 N bO 45 E 1113 50 N 52 10 E 1119~99 N 52 10 E 1126 56 N 52 10 g 1131:81 ~,10 .,89 0,62 47 84 2,40 1,53 1,35 1,64 1.69 0,00 0,00 0,00 490 507 524 540 554 565 575 5U3 590 13 N 755 40 N 786 27 N 816 10 N 844 lb N 868 93 N 888 U~ N 904 72 N 917 27 N 928 78 E 865'34 73 E 900,75 18 E 935,70 18 E 970,06 48 E 1002,43 63 E I030,35 4 E 1053,37 ~0 E 1072,50 E 1087,72 ~ g 1100.07 N 57 23 E N 5727 E N 57 30 E a 5732 E 1~ 57 32 E ~ 5732 E 595,28 599,1~ 602092 606,95 610.17 936,77 943,80 949,12 954,31 958,46 ARCO AbASKA, INC. 2G-7 .KUPARUK N. SLOPE, AbASKA MARKER TOP KUPARUK B BASE LO~ER SAND PBTD COMPUtAtION DATEI 25-5gP-84 .INTERPOLATED VAbUE$ FOR CHOSEN HORIZONS ~EASURED DEPTH BELOW KB 6272 O0 6418!006465 O0 6570 O0 PAGE; , &: .. Kgbb¥ ~USHING g bEVATION ENGINEERI MCBRIDE ORIGIN= 487'FSL; TVD FROM KB SUB-SEA 6168,18 602 6215,08 607 6319,85 6179.85 140,00 FT SURFACE bOCATION 'FW5 SEC 32,'T '$N RgE 59a,58 N'~~72 ~ 604,05 605,94 N ...... -t~3~02 E 610,17 N ,~~{!46 E UM ARCO AbASKA, INC, 2G-7 KUPARUK N. SbOPE~ AbASKA ~ARKER TOP KUPARUK B BASE LOWER SAND PBTD TD COMPUTATION DATEI 25-$gP-84 .. MEASURED DEPTH BELOW KB 6272,00 b418,00 6465,00 6570,00 ¸ ' A' FINAL WEbb bec IION AT TOll TRUE SUB-SEA MEASURED VERTXCAb VERTZCAb DEPTH DEPTH DEPTH 6570,00 6319,85 6179,85 DATE OF &URVEYI %3-dUb-84 KEbLY BUSHI~G EbEVATIONI ENGINEERI MCB~XDE SURFACE ORIGih= 487'F&L, 23b'rWb. SEC 3 TVD RECTANGUbA F~ON KB SUB-SEA NORTH/SOU 6022.49 5882 49 598,58 i 8'x8 o 8:x8 15:08 6075,0~ 605,94 6319,85 ~179,85 2E 140,00 FT HORIZONTAL t)EPARTIJRE DISTANCE AZIMUTH FEET PEG ~lN 1136,20 ~ 57 31 g SCHLUMBEROER ARCO ALASKA INC. 20-7 KUPARUK N.SLOmE. ALASKA 13-dUL-84 TVW PLOT FROM OCT DATA dOB REFERENCE 69364 WELL: 2G-7 SW SURFACE LOCATION: -400 -200 0 0 -PJ~OdEC~'.ION ON' VERTII~AL PLANE OF' AZIMUTH 487' FSL, 236' FWL, S32, T11N, RgE, UH VERTICAL PROJECTION 200 400 800 800 1000 12O0 NE WELL: 26,-7 , : SURFACE LOCATION: 487' FSL, 236' FWL, S32, T11N, R9E, UM HORIZONTAL PROJECTION NOR?M 800 600 4OO 2OO -200 -4OO -600 _-SOuq'M -800. · ~EST-~.oo · REF 69964 SCI:I&E = ! / 200 I N/FT ' -? ..... }--..F--! ........... i -400 - . -200 -0 200 400 GOO 800 ! O00E~$T · Cc~letion Report __Required I ~Date Received~, Yes ~ Well tlistory · _Sa.pies Mud Log Yes Core Chi Remarks_ · · Core Description Registered Survey Plat --Itt Inclination Survey · Directional Survey Drill Stem Test Reports Prcddct.idn Test Reports Digitized Data STRATIGRAPHIC HIGH RESOLUTION DIP METER LOCATED IN THE APPENDIX ARCO Alaska, Inc. 7 e:ephone 907 277 5637 Date: Transmi~al No: 4740 Return To: ARCO ALASKA, Inc. ATTN: Records Clerk ATO-1115B P.O. Box 100360 Anchorage, AK 99510 Transmitted herewith are the following items. Please acknowledge receipt and return one signed copy of this transmittal. S CHLb~ERGER FINALS/PRODUCTION 2G-7 Completion Record "CBL/VDL/GCT" 7/14/84 " 6000 - 6423 2B-9 CCL & Perf. Record 7/18/84 Run 1 2B-8 CCL & Perf. Record 7/13/84 " · 2B-7 . CCL & Perf. Record 7/10/84 " 2A-5 Completion Record "PPS/JB" 6/26/84 " 8.600 - 8920 1F-2 Comple[ion Record "Sq. 4" Retain" 8/02/84 " 7400 - 7750 1F-2 .Completion Record "Set Plug & Retain 8/03/84 Run 2 7450 - 7690 1F-2 CCL '& Perf. "Perf & Packer Set" 8/06/84 " "CBL/Plu - Retain/JB" ~ ~ 1G-4 Depth Dete~ination Log "CBL" 8/11/84 Run 1 5934 - 6548 1G-13 EPL "Tracer" 7/03/84 " 7400 - 7941 ~eceipt Acknowledged: Date: /cat DISTRIBUTION W.¥. Pasher C. R. Smith Sohio Union Well Files ARCO Alaska: P:':: ©;:~::~: E::,~ 360 Anchorage. Alaska 99510 Te!¢phon( 9G7 277 5637 Date: 8/12/84 Transmittal No: 4721 Return To: ARCO ALASKA, Inc. ATTN: Records Clerk ATO-1115B P.O. Box 100360 AnChorage, AK 99510 Transmitted herewith are the following items. Please acknowledge receipt and return one Signed copy of this transmittal. TAPES / Schlumberger ~GGCT #69416 Run 1 7/31/84 GCT #69417 " 8/01/84 ~ LIS #69467 " 8/17/84 OH LIS #69467~ :' " IS #69325 Run 2 6/25/84 54 - 7754 2H-13/..:.~-- /;~'"~g~'~7 33.5 - 8910 2¥-8A ~ 3227 - 8640 2G-3~'~' RFT "/ DITD/SOTE/LDT " / ~ CNL/EPT/P CD/LSS / GR ~ / Receipt Acknowledged: Date: DISTRIBUTION B.'Adams D & M W.V. Pasher C.R. Smith F.G Baker Drilling SCat~,~>Alaska.-- G. Phillips Phillips Oil Sohio P. Baxter Geology BPAE Mobil J.J. Rathmell Union R & D Well Files Chevron NSK Operations ARCO Alaska T(-!cp~',one 907 277 5637 Return To: ARCO ALASKA, Inc. ATTN: RecordsClerk ATO-1115B P.O. Box 100360 ~, horage, AK 99510 /Transmitted herewith are the following items. and return one signed copy, of this transmittal, Date: 8/23/84 Transmittal No: 4704 Please acknowledge receipt OH LIS (TAPES) Schlumberger ~ #69460 8/15/84 ---#69457 8/14/84 -"#69405 8/01/84 '"'-#69456 8/08/84 ..~ #69458 7/06/84 7/01/84 · 6/24/84 6/19/84 Run 1 2104.5 - 8497 1L-6 " 3091.5 - 8457.5 2B-3 2852 -'8044,5 2G-1 · 3871 - 7829.5 2D-9 ' Run 1-4 117 - 6482.5 2G-7 KRU { ~aska 011 & Gas Cons. Cornmlsslor! Anchorag~ /cat Receipt Acknowledged: B. Adams F.G. Baker P. Baxter BPAE Chevron Date: DISTRIBUTION D & M Drilling Geology Mobil NSK Operations W.¥. Pasher G. Phillips Phillips Oil J.J. Rathmell R&D C. R. Smith Sohio Union Well Files ARCO Alaska, Inc. Post Office Box 100360 Anchorage, Alaska 99510 Telephone 907 276 1215 August 20, 1984 Mr. C. V. Chatterton Commissioner State of Alaska Alaska Oil & Gas Conservation Commission 3001 Porcupine Drive Anchorage, Alaska 99501 Dear Mr. Chatterton: Enclosed are the Monthly State Reports for the following wells: 2G-1 2H-13 2D-10 2V-8A 2G-7 2H-14 2D-11 2B-4 2G-8 2H-15 2D-12 Thank you. Sincerely, J. B. Kewin Area Drilling Engineer JBK:ih L01 06/28/84 Enclosures RECEIVED Alaska Oil & Gas Cons. Commission Anchorage ARCO Alaska, Inc. is a Subsidiary of AtlanticRichfieldCompany STATE OF ALASKA ALASKa. ,.)IL AND GAS CONSERVATION C.~MMISSION MONTHLY REPORTOF DRILLING AND WORKOVER OPERATIONS · Drilling well (~[X Workover operation [] 2. Name of operator 7. Permit No. ARCO Alaska, Inc. 84-85 3. Address 8. APl Number P. O. Box 100360, Anchorage, AK 99510 50- 029-21124 4. Location of Well atsurface 487' FSL, 235' FWL, Sec. 32, TllN, R9E, UM 6. Lease Designation and Serial No. ADL 25656 ALK 2582 9. Unit or Lease Name Kuparuk River Unit 10. Well No. 2G-7 11. Field and Pool Kuparuk River Field Kuparuk River Oil Pool For the Month of July , 19 84 5. Elevation in feet (indicate KB, DF, etc.) Pad 104, RKB 140 12. Depth at end of month, footage drilled, fishing jobs, directional drilling problems, spud date, remarks Spud @ 0130 hrs 06/19/84. Drld 17-1/2" hole to 2205'. Ran logs. Ran, cmtd & tstd 13-5/8" csg. Performed top job w/50 sx Class "G" cmt. Drld 12-1/4" hole to 2327'. Cored well. Drld & reamed 9-7/8" hole f/2681'-2800'. Ran logs. Drld 12-1/4" hole to 6313'. Ran logs. Ran cmtd & tstd 9-5/8" csg. Cored well. Rn logs. Run borehole ultrasonic televiewer. RIH with imPression pkrs. POOH with pkr assy. RU to frac well. Monitor hole with seismometer. Rrm hole f/6390'-6457'. RIH w/borehole ultrasonic 7/11/84. Ran, cmtd & tstd 7" liner. TIH to top of liner @6010. Drld cmt f/6010'-6130'. Inject diesel dn 13-3/8"x9-5/8"ann. Ran logs CBL/GR/CCL f/6466' to 6000'. RU & perfd well. Rn 3½" tbg assy w/tail @6071'. Displ well to crude. Secured well and released rig @0630 hrs, 7/15/84. 13-3/8" 72# L-80 BTC csg w/shoe @ 2178'. Cmtd w/1000 sx PF "E" & 450 sx PF "C". 14'~mri2B~su~e~d~de~ti~/shoe @6504'. Cmtd w/250 sxs class "G". Cored interval f/2327'-2681' (Core description to be furnished upon completion.) Cored interval f/6323'-6457' " Sidewall Cores f/2327'-2800' " Cored interval f/6323'-6457' 15. Logs run and depth where run FDC/CNL/GR/DIL/CAL f/2197'-surf. DIL/SP/GR f/6456'-6312' BHCS/GR f/2182'-surf. FDC/CNL/GR/CAL/BHCS/SHDT f/6456'-6312' DIL/SP/GR/LSS/LDT/CNL/EPT/PLD/SHDT f/2800'-2100' Borehole televiewer f/6446'-6313' DIL/SFL/SP/Sonic/GR f/6301' to 2178' CBL/GR/CCL f/6466'-6000' FDC/CNL/CAL/GR/BHCS f/6301' to 2178'. RECEIVED AUG 2 ? 1984 Alaska 0il & Gas Cons. C0mmissi0n' 1 6. DST data, perforating data, shows of H2S, miscellaneous data 6360'-6340' 6340'-6322' @4SPF/90° phasing 17. I hereby certify that the foregoing is true and correct to the best of my knowledge· Anchorage ~ /~'~ . _~¢ /~ /! Area Drilling Engineer , / .... NOTE---Repor~on this fo~ re~d forth calendar month, regardless of the status of operations, and must be filed in duplicate with the Alaska Oil and Gas Conservatio~ommis~on by the 15th of the succeeding month, unless otherwise directed. =~.-- .n ~ ~ ' ...... Submit in duplicate KUPARUK ENGINEERING Date: _ · Well Name: ~~--~ DISTRIBUTION NSK Operat ion Drilling Geology/L. J. R&D D&M State F.G. Baker Blueline Blueline L-/6 b~° BI/Se Blueline ~ lb Bluel ine ~// B1/SE Blueline Geology/Ken Film copy as receipto~~'.1 VEO on mission ~e~u~ ~ ~' ATO-1115B ' P.0. Box 100360 Anchorage, AK 99510 OHFinal KUPARUK ENGINEERING,-~'~ Run ~L /-- DISTRIBUTION NSK Operation Blueline z~~O~f Dri%ling Geology/L.J. R&D D&M State F.G. Baker G eology/Ken Film Sign & return the attached :? ,c,' ATTN: AD,~h. or~f l~/r~Ad~ ATO-1115B P.0. Box 100360 Anchorage, AK 99510 OHFinal TO: DATE: TP~SHITTED HEREWITII ARE 13tE FOLLOWING: PLEASE NOTE ~ BLUELINE~PIA. F - FILN, T - TAPE, PC - PHOTOCOPY RECEIPT ACKNO~EDGED: PLEASE RETURN RECEIPT TO: AT~: PATSY s. s~z~ _~TO/St~U~ 0 7 P. O. BOX 100360 ~laska 0il & ~ ~ ~ ~ ~O~GE, ~ 99510 as Cons Corem ;nChOrage ' iSslon SHALLOW SANDS ENGINEERING TRANSMITTAL TO: [~f~w DATE: TRANSMITTED HEREWITH ARE THE FOLLOWING: PLEASE NOTE: FRO~: L. ~. S!~ITH/p: S. BAXTER BL - BLUELINE, S - SEPIA, F - FILM, O TAPE, PC - PHOTOCOPY /¢, /5,rs/ ~1+~. RECEIPT ACKNOWLEDGED: PLEASE RETURN RECEIPT TO://A~;A~S~, INC. ATTN: PATSY S. BAXTER P. O. BOX 100360 ANCHORAGE, AK 99510 KUPARUK ENGINEERING Transmittal Type of Tape ~ate Tape Number DISTRIBUTION __ OH LIS Please note: Blueline, Sign & return the ~ttached copy a .s~ecei ~ o ~Jaska .OU b_~aa Cun~ mis ~rn to: ~CO A~M~ AN~ sion ATO-1115B P.0. Box 100360 ~chorage, ~ 99.510 Sepia,~ Tape, Photocopy KUPARUK ENGINEERING Well Name: Date Run ~L rM/x~ z~, ,,, q/ DISTRIBUTION NSK Operation Blueline Dr ill lng Bluel ine Geology/L. J. BI/Se R&D Bluel ine D&M Blueline G eology/Ken Film Sign & ~u~ the ~t~%ehed Alaska 0il & Gas Cons. -Cojnmissio. AT0-1115~ ~.0, ~ox 100360 A~c~o~age, A~ 99510 OHFinal ARCO Alaska, In( Post Office Uox 100360 Anchorage, Alaska 99510-0360 Telephone 907 276 1215 July 20, 1984 Mr. C. V. Chatterton Commi ssi oner State of Alaska Alaska Oil & Gas Conservation Commission 3001 Porcupine Drive Anchorage, Alaska 99501 Dear Mr. Chatterton' Enclosed are the Monthly State Reports for the following wells: 2G-5 2G-6 2G-7 2H-1 2H-2 2H-16 WSP #11I WSP #13 Thank you. Sincerely, reaC~Dril 1 ing Engineer JBK:jh LO1 06/28/84 Enclosures RECEIVED JUL 2 5 lgl l Alaska 0il & Gas Cons. Commission Anchorage ARCO Alaska, Inc. is a Subsidiary of AtlanticRichfieldCompany /'-",, STATE OF ALASKA ALASKA C._ AND GAS CONSERVATION CO,,...,IISSION MONTHLY REPORT OF DRILLING AND WORKOVER OPERATIONS · Drilling well j~X Workover operation [] 2. Name of operator 7. Permit No. ARCO Alaska, Inc. 84-85 3. Address P. O. Box 100360, Anchorage, AK 4. Location of Well at surface 99510 487' FSL, 235' FWL, Sec. 32, TllN, R9E, UM 5. Elevation in feet (indicate KB, DF, etc.) Pad 104, RKB 140 6. Lease Designation and Serial No. ADL 25656 ALK 2582 8' APl Nu~r_21124 50- 9. Unit or Lease Name Kuparuk River Unit 10. Well No. 2G-7 11. Field and Pool Kuparuk River Field Kuparuk River Oil Pool June 84 Forthe Monthof. ,19 12. Depth at end of month, footage drilled, fishing jobs, directional drilling problems, spud date, remarks Spud @ 0130 hrs 06/19/84. Drld Drld 17-1/2" hole to 2205'. Ran logs. Ran, cmtd & tstd 13-5/8" csg. Performed top job w/50 sx Class "G" cmt. Drld 12-1/4" hole to 2327'. Cored well. Drld & reamed 9-7/8" hole f/2681'-2800'. Ran logs. Drld 12-1/4" hole to 6313'TD as of 07/02/84. Cont. drlg to 9-5/8" csg point as of 07/02/84. 13. Casing or liner rgn and quantities of cement, results of pressure tests 13-3/8" 72# L-80 BTC csg w/shoe @ 2178'. Cmtd w/1000 sx PF "E"'& 450 sx PF "C". 9-5/8" 47# L-80 BTC csg w/shoe @ 6312' cmtd w/850 sx Class "G". 14. Coring resume and brief description Cored interval f/2327'-2681' Cored interval f/6323'-6457' Sidewall Cores f/2327'-2800' (Core description to be furnished upon completion.) 15. Logs run and depth where run FDC/CNL/GR/DIL/CAL f/2197 ' -surf. BHCS/GR f/2182 '-surf. DIL/SP/GR/LSS/LDT/CNL/EPT/PLD/SHDT f/2800 '-2100' RECEIVED 1 6. DST data, perforating data, shows of H2S, miscellaneous data N/A JUL25 ]984 Alaska 011 &' Gas Cons. Commissi~ Anchorage 17. I hereby certify that the foregoing is true and correct to the best of my knowledge· /~ /~ ~ . Area Drilling Engineer be filed in duplicate with the Alaska NOTE--Re,p,/g¢~ on ~ms~g;~rm is required for each calendar month, regardless of the status of operations, and must Oil and Ga~'Conservation Commission by the 15th of the succeeding month, unless otherwise directed. Fnrm 10-404 ..... /,,~ ~ ~ ~ Submit in duplicate ARCO Alaska, Inc.' Post Office ~,vx 100360 Anchorage, Alaska 99510-0360 Telephone 907 276 1215 July 5, 1984 Mrs. Elaine Johnson State of Alaska Alaska Oil & Gas Conservation Commission 3001 Porcupine Drive Anchorage, AK 99501 SUBJECT' Conductor As-Built Location Plat - 2G Pad Wells 5-16 Dear Elaine' Enclosed is an as-built location plat for the subject wells. you have any questions, please call me at 263-4944. Si ncerely, Gruber Associate Engineer JG/tw GRU8/L26 Enclosure If ARCO Alaska, Inc. is a Subsidiary o! AtlanticRichfieldCompany ~ 49th DS 2G SZ T! I HEREBY CERTIFY THAT I AM P£OPERLY REGISTERED AND LICENSED TO PKACTICE LA~D ~c~RVETING IN THE STAT~ OF ALASKA AND THAT THIS PLAT REPRESENTS A SURVEY. MADE UNDER. MY DIRECT SUPF~V'ISION AND THAT ALL DETAILS ARE OF A DAVlO I~2.76- $ $$ Alask~ · , ~ .... ;. DS 2~ CoNDugTOI As ~pIl~ t.ocA,rt~p t. AT- 70-15- $ !.5000 LONG- 149-55-40.162 607 FSL [,AT- 70-15- 30.9 t 15 LON~ 149- 55-40. 547 ~L ~T- 70-15-~0.~204 ~14~-55-4~,1~ 487 ~L ~)- 70-1 427 ~L LOCATED I# SECTIOI 5,TII#,ItgE, O.M. 9. Y-,~943465.24 gAT- ?0-15-24.:5215 X- 50~969.91 LONG=I49-55-39.024 273 10. Y-594~405.10 ~T- 70-15- 2~.7297 ~- 5089~.75 LON~!49-55-~9,051 272 I1, Y-594~5.24 ~T- 70-15-23,~4~ X- 508969,92 5ON~ 149-55-39,028 272 272 ~TED IR S~CTIOI 6.TIO~.~gE, U,~ 14. Y-594~545.15 ~T- 70-15-2~.1441 ~.508~9.90 ~N~149-55-49.50~ 4 ~" JUL i S7~ 123 ARCO Alaska, inc. Kuperuk Proj~t North Slope Drllli~ D.S. 2, G CONDUCTORS 5' 16 AS- BUILT MEMORANDUM State of Alaska ~KA OIL AND GAS CONSERVATION COMMISSION TO: THRU FROM: a~-erton Lonnie C. Smith Commis s ioner Dons Amo~ Petroleum Inspector DATE: June 22, 1984 FILE NO: D. 4I. 27 TELEPHONE NO: SUBJECT: Witness the BOP Test at ARCO's Kup. 2G-7 Well, Sec. 32, TllN,R9E,UM, Permit No. 84-85 on Doyon Rig No. 9. Tuesday, June 19, 1984: I traveled this date to Prudhoe Bay to witness 'the Bo,'test'rat ARCO's Kup 2G-7 Well. Wednesday, June 20~ 1984: The BOP test was delayed due to casing hang'er 'p~0b lems. ......... Thursday, June 21, 1984: The BOP test co~enced at 2:45 am and was concluded at-'~'4:45'am.-'There were no failures and I filled out an AOGCC BOP test report which is attached. in summary, I witnessed the successful BOP test at A_RCO's Kup. 2G-7 well. Attachment 02-00IA(Rev. 10/79) -" ,'O&G #4 4/80 STATE OF ALASKA ALASKA OIL & GAS CONSERVATION COMMISSION B.C. P. E. Inspection Report Inspector ~Ot~ Operator ~Vd~D I Location: Sec · · Drilling Contractor Date (~ -Z l- Representative, Ps rmi t $ ~ ~/~ Casing Set Representativ~ LocatiOn, General Well· Sign. .. General Housekeeping (~ ~-~ Reserve pit , , - Rig BOPE Stack Annular Preventer Pipe Rams ~ u./ Blind Rams Choke Line Valves H.C.R. Valve W/ Kill Line valves Check Valve Test Pressure .. ACCUMULATOR SYSTEM Full Charge Pressure. ~ ~O psig Pressure After Closure ~OO psig 200 psig Above Precharge Attained: Full Charge Pressure Attained: ~_ N2 ~~.~DO;~O;~Q~/~d~ psig Controls: Master ~'. Remote ~ Blinds switch cover Upper Kelly Lower Kelly Bal 1 Type Ins ide BOP Choke Manifold Kelly and Floor Safety Valves I ~Test Pressure [ ~'Test Pressure , ~ t/~Test Pressure , I ~est Pressure ~ ~est Pressure No. Valves No. flanges Adjustable Chokes Hydrauically operated choke min ~ ~sec. min ~O sec. Test Results: Failures kl_6F% ~- Test Time Repair or Replacement of failed equipment to be made within Inspector/Commission office notified. Remarks: hrs. ~ fi , , , days and Distribution orig. - AC&GCC cc - Operator cc - Supervisor InsPector June 14, 1984 Mr. J. B. Kewin Area Drilling Engineer ARCO Alas~a, Inc. P. O. Box 100360 Anchors§e, Alaska 99510 Re: Kuparuk River Unit 2G-7 ARCO Alaska, Inc. Permit No. 84-85 Sur. Loc. 487'FSL, 235'FWL, Sec. 32, TllN, R9E, UM. Btmhole Loc. 1343'FSL, 1350'FWL, Sec. 32, TllN, RgE, UM. Dear Mr. Kewin, Enclosed is the approved application for permit to drill the above referenced well. If coring is conducted, a one cubic inch chip from each foot of recovered core is required. Samples of well cuttings, and a mud log are not required. A continuous directional survey is required as per 20 AAC 25.050(b)(5). If available, a tape containing the digitized log information shall be submitted on all lo§s for copying except experimental logg, velocity surveys and dipmeter surveys. Many rivers in Alaska and their drainage systems have been classified as important for the spawning or migration of anadromous fish. Operations in these areas are subject to AS 16.05.870 and the regulations promulgated thereunder (Title 5, Alaska Administrative Code). Prior to commencing operations you may be contacted by the Habitat Coordinator's Office, Department of Fish and Game. Pollution of any waters of the State is prohibited by AS 46, .Chapter 3, Article 7 and the regulations promulgated thereunder (Title 18, Alaska Administrative Code, Chapter 70) and by the Federal Water Pollution Control Act, as amended. Prior to commencing operations you may be contacted by a representative of the Department of Environmental Conservation. To aid us in scheduling field work, please notify this office 24 hours prior to commencing installation of the blowout prevention Nr. ~effrey B. ~e~.n K~a~uk RiVer Unit 2~'? -2- equipment so that a representative of the commission may be present to wttness testing of the equipment b~for? the surface Casing shoe is drilled. ~nere a diverter system xs required, please also notify th~a office 24 hours prior to commencing equipment instal!etlon so that the Commission may witness testing before drilling below the shoe of the conductor pipe. In the event of suspension or abandonment, please give this office adequate advance notification so that we may have a witness present. Very truly yours. C. V. Chatterto~ Chairman of ~l OaDaHOP. T~2 co~s~;oN Alaska Oil and Gas Conservation Commission be Enclosure cc~ Department of Fish & Game, Habitat Section w/o encl. Department of Environmental Conservation w/o encl. ARCO Alaska, Ir Post Offic= ,Jox 100360 Anchorage, Alaska 99510 Telephone 907 276 1215 June 7, 1984 Mrs. Elaine Johnson State of Alaska Alaska Oil & Gas Conservation Commission 3001 Porcupine Drive Anchorage, AK 99501 SUBJECT: Conductor As-Built Location Plat - 2G-Pad Wel 1 s 5-16 Dear Elaine' Enclosed is an as-built location plat for the subject wells. If you have any questions, please call me at 263-4944. Sincerely, J. Gruber Associate Engineer JG7/L85- tw Enclosure ARCO Alaska, Inc. is a Subsidiary of AtlanticRichfieldCompany ~ 49th .5 .6 m? 31 DS 2G I HEREBY CERTIFY THAT I AM PEODEELY REGI STERED A~tD LICENSED TO PRACTICE LAND SUP. VEl'lNG IN THE STATE OF ALASKA AI{D THAT THIS PLAT REPRESENTS A SURVEY. MADE UHDER MY DIRECT SUPERVISION AI~D THAT ALL DETAILS ARE CORRECT AS OF- 5-~,~-~4- Al DAVID Fit 5276- S r'-"'!G CO~DUCTOI AS RUILT LOCATIONS LOCATED IN SECi'IOB 32,TI IN,RgE,U.M. 5. Y-594419~.05 LAT- 70-15-31.5000 X- 508929.92 LONG-149-55-40.162 236 FWL 607 FSL 6. Y-5944135.~1 LAT- 70-15-30.9115 X- 505929.90 LONG-.149-55-40.165 236 FWL 547 FSL 7. Y-5944075.12 LAT- 70-15-30.3204 X- 508930.00 LOb'G-149-55-40.164 236 FWL 487 FSL 8. Y-5944015.09 LAT- 70-15-29.7299 X- 505929.94 LONG-149-55-40.16~ 235 FWL '427 FSL LOCATED IN SECTION 5,TI ON,RgE,U.M, 9. Y-5943465.24 LAT- 70-15-24.3215 X- 508969.91 LONG-149-55-39.024 273 FWL 123 FNL I0. Y-5943405.10 LAT- 70-15-23.7297 X- 508969.75 LONG-,149-55-39.(~31 272 FWL 183 FNL I I. Y-5943345.24 LAT- 70-15-23.1409 X- 503969.92 LONG-149-55-39.028 272 FWL 243 FNL 12. Y-5943255.17 LAT- 70-15-22.5500 X- 508969.84 LONG-149-55-30.032 272 FWL 303 FNL LOCAIF-D IN S~JCTIOI4 6,TIOH,RgE,U.M- 13. Y-5943255.18 LAT- 70-15-22.5542 X- 50S609.92 LONG-149-55-49.504 88 FEL 303FNL 14. Y-5943345.15 LAT- 70-15-23.1441 X-505609.90 LONG-149-55-49.502 88 FEL 243 FNL 15. Y-5943405.25 LAT- 70-15-23.7353 X- 505609.95 LONG-149-55-49.499 88 FEN., 183 FNL ~_"" 16. Y-5943465.22 L~T- 70-15-24.3252 X- 508609.93 LONG-149-55-49.497 87FEL 123 FNL 2G ARCO Alaska, Inc. Kuparuk Project North Slope Drilling D.S. 2'G CONDUCTORS AS - BUILT 5-16 date' 6.2.84 drawn by' D Filucci scale' None dWg. no.: 9.05207d I ARCO Alaska, Inc..~,~k, Post Office B~_. 100360 Anchorage, Alaska 99510 Telephone 907 276 1215 June 8, 1984 Mr. C. V. Chatterton Commissioner State of Alaska Alaska Oil & Gas Conservation Commission 3001 Porcupine Drive Anchorage, AK 99501 SUBJECT: Kuparuk 2G-7 Dear Mr. Chatterton: Enclosed are: o An application for Permit to Drill Kuparuk 2G-7, along with a $100 application fee o DiagramS showing the proposed horizontal and vertical projections of the wellbore ° A proximity plat o A diagram and description of the surface hole diverter system o A diagram and description of the BOP equipment Since we estimate spudding this well on June 21, 1984, your earliest approval would be appreciated. If you have any questions, please call me at 263-4970. Sincerely, A~~e~~lliing Engineer JBK/JG:tw GRU7/L88 Enclosures RECEIVED JUN 1 1 Alaska Oil & Ges Cons. Commission Anchorage ARCO Alaska, Inc. is a Subsidiary of AtlanticRichfieldCompany STATE OF ALASKA ?'"~ ALASKA (JiL AND GAS CONSERVATION CO~,MISSION PERMIT TO DRILL 20 AAC 25.005 la. Type of work. 2. Name of operator ARCO Alaska, Inc. DRILL I-XJX REDRILL [] DEEPEN [] lb. Type of well EXPLORATORY [] DEVELOPMENT OIL [~X DEVELOPMENT GAS [] SERVICE [] STRATI~RAPH lC SINGLE ZONE [~(X MULTIPLE ZONE 3. Address P. 0. Box 100360' Anchorage, Alaska 99510 4. Location of well at surface 487' FSL, 235' FWL, Sec.32, T11N, RgE, UN At top of proposed producing interval 1312' FSL, 1310' FWL, Sec, 32, T11N, RgE, UR At total depth 1343' FSL, 1350' FWL, Sec. 32, TllN, R9E, UN 5. Elevation in feet (indicate KB, DF etc.) RKB 140', PAD 104' 6. Lease designation and serial no. ADL 25656 ALK 2582 9. Unit or lease name Kuparuk River Unit 10. Well number 2G-7 11. Field and pool Kuparuk River Field Kuparuk River 0il Pool 12. Bond information (see 20 AAC 25.025) Federal Insurance Company Type Statewide Surety and/or number #8088-26-27 Amount $500~000 13. Distance and direction from nearest town 30 mi. NW of Deadhorse miles 14'. Distance to nearest property or lease line 487 feet 16. Proposed depth (MD & TVD) 17. Number of acres in lease 6724' MD, 6382' TVD feet 2491 19. If deviated (see 20 AAC 25.050) 120. Anticipated pressures KICK OFF POINT 2870 feet. MAXIMUM HOLE ANGLE 41 oI (see 20 AAC 25.035 (c) (2) 15. Distance to nearest drilling or completed 2G-6 well 60' @ surface feet 18. Approximate spud date 06/21/84 2752 psig@ 80oF Surface ~16_~ psig@.. _~!8~, ft. TD (TVD) 21 Proposed Casing, Liner and Cementing Program SETTING DEPTH QUANTITY OF CEMENT SIZE Hole I Casing Weight 30" 120,, 91.5# 17-1/2"I 13-3/8"! 72.0# 12-1/4 9-5/8" 47. O# 8-1/2" 7" 26,0# 22. Describe proposed program: CASING AND LINER Grade Coupling[ Length H-40 Wel~ 80 L-80 BTc! 2735 L-80 BTC~ 6220 J-55 BTC] 771 ~ HF-ERW MD TOP TVD 36' I 36' I 35' 35' I 33' I 33' I 5953' I 5623' MD BOTTOM TVD 1161 116' 2770~ 2770' 6253~ 5917' 6724'l 6382' I I (include stage data) 250 1220sxPermE+450sxPerm C 590 sx Class G 300 sx Class G ARCO Alaska, Inc., proposes to drill a Kuparuk River Field development well to approximately 6724' MD (6382' TVD)o A 4" diameter oriented core will be cut through the Kuparuk. Selected intervals will be logged. A 20", 2000 psi annular diverter will be installed on the 20" conductor while drilling the surface hole. A 13-5/8", 5000 psi, RSRRA BOPE stack will be installed on the 13-3/8" surface pipe. It will be tested upon installation and weekly thereafter. Test pressure will be 3000 psig (1800 psi for annular). Expected maximum surface pressure is 2752 psi. Pressure calculations are based on virgin reservoir pressure. Surface pressure is calculated with an unexpanded gas bubble at surface, including.temperature effects, Casing will be tested to 2000 psi prior to releasing the drilling rig. Non-freezing fluids will be left in uncemented annuli through the permafrost interval. 2G-7 will be 60' away from 2G-6 at the surface. There are no closer wellbores anywhere downhole. Reserve pit fluids will be disposed of by pumping them down the 9-5/8" x 13-3/8" annulus. (see attached sheet) -23. I hereby certif, y~at the foregoing is true and correct to the best of my knowledge SIGNED TITLE Area Drilling Engineer CONDITIONS OF APPROVAL Samples required I--lYES J~NO Permit number .o. o 01 Mud log required i-]YES ,,~NO Approval date ~ 06/!4/84 Directional Survey required ~ES []NO JAPI number 5o- ,~ 2~?- ,Z//2fz SEE COVER LETTER FOR OTHER REQUIREMENTS ,COMMISSIONER DATE June 14, 1984 by order of the Commission Submit in triplicate PERMIT TO DRILL 2G-7 The 9-5/8" x 13-3/8" annulus will be left with a non-freezing fluid during any interruptions in the disposal process. The well will be completed by the workover rig using 3-1/2", 9.2#/ft, J-55, BTC tubing. Selected intervals will be perforated within the Kuparuk formation and reported on subsequent reports. A subsurface safety valve will be installed and tested upon conclusion of the job. RECEIVED Alaska Oil & ~as Cons. Commission Anchorage A~NULAR PREYE~TER PIP~ ~ BLIND $R ! L L ~ NG , 5 ED 2 DIAGRAM ~1 13-5/8" 5000 PSI RSRRA BOP STACK 1. 16" - 2000 psi Tanked starting head 2. 11" - 3000 psi casing head 3. 11" - 3000 psi x 13-5/B" - 5000 psi spacer spool 4. 13-5/B" - 5000 psi x 13-5/8" - 5000 psi Urilling spool 5. 13-5/8" - 5000 psi pipe rams 6. 13-5/8" - 5000 psi drilling spool w/~hoke an~ kill lines 7.- 13-578" - 5000 psi pipe rams 8. 13-5/8" - 5000 psi blind rams g. 13-5/8" - 5000 psi annular ACCUMULATOR CAPACITY TEST '1. CHECK AND FILL ACCUMULATOR RESERVOIR TO PROPER LEVEL WITH HYDRAULIC FLUID. 2. ASSURE THAT ACCUMULATOR PRESSURE IS 3000 PSI WITH 1500 PSI DOWNSTREAM OF THE REGULATOR. 3. OBSERVE TIME, THEN CLOSE ALL UNITS SIMULTANEOUSLY AND RECORD THE TIME AND PRESSURE REMAINING AFTER ALL UNITS ARE CLOSED WITH CHARGING PUMP OFF. 4. RECORD ON NADC REPORT, THE ACCEPTABLE LOWER LIMIT IS 45 SECONDS CLOSING TIME AND 1200 PSI RI~MAINING PRESSURE. 13-5/8" BOP STACK TEST 1. FILL BOP STACK AND MANIFOLD WITH ARCTIC DIESEL. 2. CHECK THAT ALL HOLD DOWN SCREWS ARE FULLY RETI~ACT- Ep. PREDETERMINE DEPTH THAT TEST PLUG WILL SEAT AND SEAT IN WELLHEAD. RUN IN LOCK DOWN SCREWS IN HEA~. 3. CLOSE ANNULAR PREVENTER AND W~LL¥1~S )J]DS~ O1~ ~-IOKES. DON'~T TEST AGAINST CLOSED CHOKES 4. TEST ALL COMPONENTS TO 250 PSI AND HOLD'FOR 10 MINUTES. 5. INCREASE PRESSURE TO 1800 PSI AND HOLE FOR 10 MINUTES. BLEED TO ZERO PSI. 6. OPEN ANNULAR PREVENTER AND CLOSE TOP SET OF PIPE RAMS. 7. INCREASE PRESSURE TO 3000 PSI AND HOLD FOR 10 B. ~~'PRESSURE DOWNSTREAM OF CIDKE ISOLATION V.A~L.V~$~ TO ZERO PSI TO TEST VALVES. TEST REMAINING UNTESTED MANIFOLD.VALVES, IF ANY, WITH 3000 PSI UPSTREAM OF VALVE AND ZERO PSI DOWNSTREAM. BLEED SYSTEM TO ZERO PSI. 9. OPEN TOP SET OF PIPE PJ~IS AND CLOSE BOTTOM SET OF PIPE RAMS. 10. INCREASE PRESSURE TO 3000 PSI AND HOLD FOR 10 MINUTES BLEED TO ZERO PSI. 11. OPEN BOTTOM SET OF PIPE RAMS. BACK OFF RUNNING JOINT AND PULL OUT OF HOLE. CLOSE BLIND RAMS AND TEST TO 3000 PSI FOR 10 MINUTES. BLEED TO ZERO PSI. 12. OPEN BLIND RAMS AND RECOVER TEST PLUG. MAKE SURE MANIFOLD AND LINES ARE FULL OF ARCTIC DIESEL AND ALL VALVES ARE SET IN DRILLING POSITION. 13. TEST STANDPIPE VALVES TO 3000 PSI. 14. TEST KELLY COCKS AND INSIDE BOP TO 3000 PSI WITH KOOMEY PUMP. 15. RECORD TEST INFORMATION ON BLOWOUT PREVENTER TEST FORM SIGN AND SEND TO DRILLING SUPERVISOR. 16. PERFORM COMPLETE BOPE TEST ONCE A WEEK AND FUNC- TIONALLY OPERATE BOPE DAILY. RECEIVED JUN 1 11904 Alaska Oil & Gas Cons. Commission Anchorajce Surface Diverter System 1. 16"-2000 psi Tankco starting head. 2. Tankco quick Connect assy. '~6" X 20" 2000 psi double studded adapter. 20" 2000 psi drilling spool w/lO" side outlets. 5. 10" ball valves, hydraulically actuated, w/10" lines to reserve pit. Valves to open automatically upon closure of annular preventer. 6. 20" 2000 psi annular preventer. 7. 20" bell nipple. Maintenance & Operation 1. Upon initial installation close annular preventer and verify ~hat ball valves have opened properly. 2. Close annular preventer and blow air through diverter lines every 12 hours. 3. Close annular preventer in the event that gas or fluid flow to surface is detected. If necessar¥~ manually override and close ball valve to upwind diverter line. Do not shut in wel~. under any circumstances. 16" Conductor RECEIVED JUN 1 I984 Alaska Oil & Gas Cons. Commission Anchorage _of FOR NEW WELL PERMITS Lease & Well No. iTEM APPROVE DATE YES NO REMARKS (1) Fee /~K ~/Z-~ 1. Is the permit fee attached .......................................... ~__ <2 thrt~ 8) (3) Admin(~~ru ll)-_~f~m~~ ~1~ and 11) (4) //:// (12 t~ 20) 2-. Is well to be,located in a defined pool ............................. 3. Is well located proper distance from property line .................. 4. Is well located proper distance from other wells .................... 5. Is sufficient undedicated acreage available in this pool ............ 6. Is well to be deviated and is well bore plat included ............... 7. Is operator the only affected party ............................ .~ 8. Can permit be approved before ten-day wait iii i · · · eeee · ee ee~ e 10. 11. 12. 13. 14. 15. 16. 17. 18. 19. 20. Does operator have a bond in force .................................. ~__ . Is a conservation order needed ...................................... /~ Is administrative approval needed ........................ ~ .......... : Is conductor string provided ...................................... Is enough cement used to circulate on c~:ductor and surface . . . Will cement tie in surface and intermediate or production strings ... Will cement cover all known productive horizons ................... ' Will surface casing protect fresh water zones., ...... Will all casing give adequate safety in collaPse, tension and burst Is this well to be kicked off from an existing wellbore ............. Is old wellbore abandonment procedure included on 10-403 ............ Is adequate well bore separation proposed ........................... (21 thru 24) 21. 22. 23. 24. Is a diverter system required ................................. Are necessary diagrams of diverter and ~'equipmen: attache~ /~,,' Does BOPE have sufficient pressure rating - Test to Does the choke manifold comply w/AP1 RP-53 (Feb.78) .................. (6) Add: 25. Additional requirements Additional Remarks: ~0 Geology: Engineering: / HWK~ LCS BEW rev: 12/08/83 6.CKLT 'INITIAL GEO. UNIT O'S/OFF POOL CLASS STATUS AREA NO. SHORE Well History File APPENDIX Information of detailed nature that is not particularly germane to the Well Permitting Process but is part of the history file, To improve the readability of the Well History file and to simplify finding information, information, of this nature is accumulated at the end of the file under APPENDIXi No special 'effort has been made to chronologically organize this category of information. uoTsm..tumo9 'suo9 se9 ~ IlO ~ SHDT DIPMETER '- M$OHDT CbUST~R ~IST~NG ARCO AbA~AA ZNC bEV, , * 2187, * 2189, * 2191, * 219]. 2197, 2199e 2201. * 2203 * 2205 * 2207 * 2209 * 2211 2213 * 2215 * 2217 222{ 2:233 223 2237 ' 't ~249 2254 7 17 .~ Z39 7 8 B 20.4 286 8 20,1 242 8 12,2 188 ld 7,9 312 8 4,0 266 8 2.5 152 8 187 1,4 9 9 9. 9 9 2 ' 4: I81 9 ::$, ~ 2.7t: 0 2,7 295 1.0 l,O 1.0 1,0 1.0 i.0 1,0 0.9 0.9 0,9 0,8 ,8 8 177 1~.2 17b 13.1 17~ 12,3 17~ 11.3 17b 12,2 181 12.3 17'1 il,id 17'1 12,2 1.7 ll,b 1~ 11,2 17I 11.4 '1, '180: I"1. PaGE 1 -Flh~ ........... 2-4 13,6 C 12,fi 12,b 11,8 D I~,9 C 10.8 117 ti 7 11 7 C 12 0 C 119 12 5 12 0 107 C 10 A~CO AbA~KA ~NC NUR~H ~bOP~ ~ AbA~KA PAG~ ~mmmmm mmmmmmmmmmmm*mm~mmmmm~mmmmm~mmmmmmmmmmm~mmm DEV. bEV, OIAM DLAM AZI, 1-3 2-4 * 2268,0 5,U 353 0,9 162 10,8 12,0 * 2270,0 9.I 15 0.8 162 11.0 11,7 * 2274,0 2.7 256 0,6 134 II.Y 11 , ~2v~,o ~.~ 2]2 u,~ ~ * 2278,0 5,8 322 0.~ 159 1 * 2280,1 3,] 4 U,~ 17Z 11,2 12,0 * 2282.1 3.2 162 0.9 177 10.7 11,8 * 2~,1 b.5 213 0,9 180 ~0,6 * 2 ,1 3,~ 39 0.9 180 * 2290,1 ,7 326 0.8 173 , , , 174 11' , * 229, ~ , . 183 .7 I66 · DIP DIP · D[V, bEV. D1AM · AZ1. · AZI, 1-3 2348. 235U. 2352, 2354, 2356, 2358. 2360, 2~62. 2372, 237~, 2~76, 2378~ 2380, 2382~ 2386[ 0,5 lbo 10.0 3.]3 0.5 160 305 O, 5 164 9.9 249 O,b 109 182 O,b 172 10~ O,~ 172 9,9 103 O,b 170 227 O,b 16b 163 0,6 168 2 3 , 6 i62 '6 I65 388,1 ':: 2 ~ ~ 6 i71 . 390'1 i J .'". 394,1 7 9 80 0 6 i6'9:9 ........... * INDEX 2-4 · mA 10,2 C '9,9 ~ 9 A 98 A 9 9 99 A 99 A 9.9 A 9, C ADCO A~ASKA I~C ~Uk~H SbUPE * * ~'OHMATION * ' ~ ~'mmm~mmmmm~m~mmmmmm~mmmm~mm~mmmmm * D~PTt~ · DIP DIP * bEV, D~ * * AZI. · AZ 2486, 242B,1 2,b 33b 0.7 174 2430.1 4,4 33i 0,7 172 2432,1 U,7 171 2434,1 4.2 100 0,6 172 2438.1 2,3 119 0,6 172 2440,1 o,0 177 2446.1 6 172 2448.1 0,6 172 2a;50,1 2.7 83 0o~ 2452.1 3.~ 8b 2454,1 O.7 172 2458,~56'I O' 0 ~ 170 ,7 17I 460,1 9 182 173 17~ BUREHU~E' V~ U~A~ I, 1-3 9.8 9.7 PAG~ 4-Flbg ...... =----~ INDEX 2-4 · =A 9,4 9,7 A C A A A A c ARCO ALASKA l~C NUN~H 5bUP~ ALASKA 2510,0 2512,,0 2514,U 2516,0 2518.0 2520.0 2522.U 2520,0 2530.0 2534.0 2538'~ 2542,0 2546,0 2554' 2558,0 25~2~ 2566. 17~ 0,7 1~0 0,7 177 9.9 272 0,7 17b 290 0,7 17~ 9.7 287 0,7 180 166 0.6 I~il O,6 179 73 0,5 l'lJ 9,6 0,6 182 b~ O,b 190 52 0,~ 192 9.9 32 .7 19~ v, 7 191 252 ..... · iNDEX 9,8 9,3 9,~ A A A A A : ;% DEPTH 2588.0 2590,0 2592.0 2594.0 2596,0 2598,0 2600,0 2602,0 2604,0 2606.0 ~60g, 0 261 .0 .0 261 , 2618. 22,0 7,2 209 7.5 207 2.9 352 3.3 343 l,b i9~ 2.~ 2~6 2,7 153 2,3 304 b 204 9,1 DE~, |)EV, OlAM AZI, I'3 0,0 0.8 0.~ O.g O.B 0 0 0 0 '2-4 204 10,0 9,8 203 i0.0 9.9 201 19~ 19b 9,b 9,b 19b 9,7 9,7 20~ ~,9 lO.O 20 2Ob 201 200 g,~ 201 9, 9, 2'02 ARC~ AbASKA INC NORTH SbOPE ~ AbA6KA PAG~ 7-F~E~ ~ DLFT~ 2668~ 2670. 2672. 2674. 267b~ 2678, 268~ 268 : 2684, 2686. 2690; 2692' 2696~ 2700, 2702, * EL~MAIIO~ · ~U~H · ~UAb~ , .................. · ................................ L' * INDEX ~ DIP DIP * DE~, D~V, DIAM DIAM · B~T * AZ!, * AZI. 1-3 2-4 * =A 4.4 340 0 2' 0 ;6 317 : 33:0: 0 3,9 305 9,8 0 5,8 300 9,8 0 5,9 22b 9,7 0 2,0 186 9,7 A 0 9,8 0 9.7 0 ~'/ 229 9,9 A 0 1.9 258 9,8 A 0 9 0 6,2 80 8 C 0 C 0, ::::: :::::~:0':: .: :.: ::: :1: ~~ 210 . : 2.1 248 .9 235 0,8 205 9,8 0.8 205 9.8 0,8 2Db 9,M 0.8 208 9,7 0,8 213 9,8 0,8 215 9.7 O,7 21~ 9,9 0,7 208 9.9 0,8 205 ~ 9 0,8 207 ~ ~9 0,8 21~ 9,9 1 9.9 O,i 2 ,8 209 . A~CO ALASKA INC NO~TH SbU~E AbA~KA · DE, PTR * DiP DIP * D~V, DEV, · * AZI, * AZI, 1-3 ~ 2?48.0 4.9 B1B' 0.8 20? ~ 2?50.0 0.6 207 I0.0 · 2752~0 1.5 206 0,9 207 IO,O · 2754.0 3.6 189 0.9 20~ 10.0 · 2756,0 1,9 174 1,0 206 10,0 · 2758.0 2.6 145 1.0 266 9.9 · 2760~0 0~9 205 9 · 2762,0 3.4 289 0.9 205 · 2764,0 3°2 285 1 ~ 207 · 2766,0 2,0 280 1 0 205 9;9 · 2765,0 1.9 144 I 0 208 · 2770~0 4.4 158 1 0 206 9,9 0 3, g 1:,~ 25,0 ~, ~ 0 2, PAGE B'~'IL~ 2 ........... * INDEX * 2-4 * =A 9,9 9.9 9,9 9.8 9, 9. 9 ARCO AbASKA ~C ~OETH SbUPE , AbA~KA ~ ~mmmmmmmm mm~mmmm~mmmm~mmmmmmmm~mmmmmmmm~mm~mm DEPT~ 21~7, 2189. 2191, 2{93, 2!95, 2197, 2199~ 2201. 2203, 2205~ 2207~ 2209. 2211 2213 2215 2~ 2~21 261254 24.9 16.6 22,0 7,5 255 0,o 123 16 223 1.0 175 13: 1,I 174 13, 109 I.% 174 11. ~15 1,1 174 1~. 232 l.O 177 256 1.0 181 11. 1,O 179 33~ 0.9 177 11. ~ 0.9 175 0,9 175 ' 1'72 1~ 170 29 0 '8' 169 11o ,0 i78 1']' · 0' I'77 i I75 1:0~ PAGE 1-FILE ********************* .......... --* INDEX 2-4 ********************* 13,2 C 13,8 D 12 5 12~8 D 11,4 D 12.3 C 10.7 B 11.6 C 12,~ 12, B 12,7 C l ,o 1'2,0 ::,o I0~, ARCO AbASKA iNC NORTH SbOPE AbASKA ********************************************************** * DEPTH * DIP O1P * DEV, DEV, * * AZI. * AZI. * * 2268,0 * 2270.0 * 2272,0 * 2274,0 * 2276,0 * 2278,0 * 2280 * 2282 * 2284 * 2286 * 22~8 * 2290 ~ 2292 2294 2296 * 2~g8 11,2 19 20.1 18 2.9 275 5.2 350 3,~ 49 3, 65 7'5 20 . i95 1,0 175 0.9 169 0,9 16b 0,7 166 O,b 168 0,5 1.69 0,6 169 0.7 170 O~9 174 0,9 177 o;~ O, 179 O ~ '4: i:'7 .7 1' '3 ~::: ioo !0 ~6 DiA~ I-3 lO,l 10.6 10.8 11.9 12,1 12.2 11,8 11.7 1, 7 11,0 10.9 11,7 I 1:,,~ i:i: PAGE 2 FAbE 1 * OUab~ * ------* INDE * DiAN * BEST * 2-4 * =A * 12,5 !2,2 11,9 12,0 11,9 12,0 12,0 12,1 11,9 11.9 11,9 12,0 I1,~: 1'I, , 2348,1 2350.1 ~.$ 235 2362,1 2354.1 2356,1 2,7 307 2358.1 2,8 280 2360,1 5.] 179 2362.1 1.7 I10 2364,1 2366,1 5°8 57 2368,1 4,7 212 2370.1 2372,1 7,9 240 2374,1 8.8 262 2376,1 14.3 266 2378, 2380, ~384,,1186,1 11:,5:~ 327 .1 I 19~ 0 0 I 4.8 BOREHOI, E * QUAb; * ............................... l INDE X DEV, DEV, DIAM DIAM * BEST AZI, 1-3 2'4 * =A 0,5 lbb 10,0 0.5 163 9.9 O,~ 162 10,0 O, 164 9.9 0,5 167 10,0 0,6 170 9.9 U,t; 171 9,9 0,6 170 9.9 0.6 169 9.9 O.b 167 i0.0 0,6 167 10 0 .71 it:lo . 6 1'6 9 ~,6:. - : :168 ,,6', 9,9 10,0 A 10,0 9,9 10,0 C 9,9 C 10,0 A 9,9 A 1~,0 9 9,9 O 10 i B 10! C 10 ::::::::::::::: ::::::::::::::::::::::::: :::::::::::::::::::: :::::::::::::::::::::::::::::::::::::::::::::::::::::~::::::::::::::::::::::::::::::::: :::::::::::::::::::::::::::~::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::: ::::::~::::::::::::::::::::::::::~::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::~:~:::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::~:::::::::::::::::::::::::::::::::::::::: :::::::::::::::::::::::::::::::::::::::::::: :::::::::::::::::.::::::::::: :::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::~::::::::::::::::::::::::::::::::::~::::::::::::::::::::::::~::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::: :::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::: ::::::::::::::::::::::::::::::::::::: :::::::::::: { ARCU AbA~KA INC NORTH SbUPE AbASKA PAG~ 4~FlbE , : : * .................. * ........ - ......................... * I~DE~ DEPTH * DiP DIP · gEV, DEV. DIAM ~IAM * BE~ * AZI · AZI 1-3 2-4 2428 1 11,~ 50 0,7 17U 9,8 2430[1 3.6 5 0,7 170 9.8 2432.1 0,7 16~ 9.9 0.7 166 9.8 2434,1 2436,1 ~,2 75 0.7 166 9.9 2438ol 1.8 ~72 0.7 168 2440,1 2,b 120 0,~ 170 9.~ 2442.1 O, 170 9.8 2444 1 4,4 293 0 ~ 168 450:1 ~.~ .~ ~o .v ~ 2466, 4 .2 281 9,7 9.5 9 4 9 5 9,,7 :9,9 :9': ~0 I0 ' 0 lO; A A A A A A C A A C A ARCO ALASKA INC NORTH SI,OPE AI~A,SKA {mmmmm.mm m~mmm~mmmmmmm~mmmmmm mmmmmmm 2508.0 251o,o 2512.u 2514,o 2516,0 2518.o 2520,0 2522.0 2524,0 2526.0 _ 2528,0 25~0,0 534 0 25~6 0 2538 2540, 2542 276 295 157 2,~ 42 3,6 80 3,3 72 ~.0 5O 2'9 330 3,1 327 0 0 2,6 22 :i O: 2.7 255 2,~2 i 0 3. 25 AZI, i'3 .7 183 10.I .7 183 10.0 ,7 183 10.0 ,? 182 10.0 7 lB! 9,7 '7 179 9 7 ,~ 177 9.4 .6 178 9.6 ~6 180 go9 ,~ 18b .6 188 10.0 10,0 10.0 9,9 10,0 9.7 9,,'7 9,3 9,8 O~ t0 ,i 2588. 2590, 2592, 2594, 2596, 2598, 2600 2602 2604 2606 2608 2610 2612 261~ 2610 2618 2620 2622 DIP DiP * DEV. DEV. DIAM DIAM AZI. * AZI, 1-3 2'4 0 4.3 228 0,8 198 9,7 9 0 7,4 213 0.~ 199 10.3 10 0 7,0 207 0.8 199 10.0 0 0.8 197 9.9 9 0 3.'! 280 0,8 195 9e9 10 0 ~.6 343 O.9 192 Q.6 9 0 O,U 191 0 2,6 179 ~.8 194 9,8 10 0 lO,O 165 0.8 195 10.1 10 0 1.5 206 0,9 I97 IO.O 10 0 1,8 263 0,~ 19B 10.~ 10 0 2'7 186 O. 199 9, 9 0 4, ~ 18! 0.~ 199 9.7 0 2, 211 0,8 99 9.5 0 10. 56 .8 I97 9 200 9' 1.7 125 =A ,9 A .0 ~ ,0 C .7 A ,1 A .2 C 9 A B , 8 206 .8 33i · 8' :20'4 l O; 9:;8 * 1: 0~, 10, 9 :~ 9 ~ tO; 9 ;g A * * ..... .,,.,,,.,.. DEPTH * DIP DiP * AZI, 2668 0 26~0~ 2672.0 2674.0 2676,0 2678.0 2680,0 2682.0 2684,0 2686 0 2688 2690 2692, 2694. 4,9 14,2 2.i 2,6 0 0 2 9 0 2 4 o 2 C · B * A * A * C * 340 0,9 202 9.9 48 0.8 202 9.9 250 V,8 201 9.9 265 0.8 201 9.8 295 0,8 20! 9.9 0,8 201 9.9 257 0,8 202 I0.0 o,8 204 10,0 0.8 206 10.0 0,8 208 10.0 48 0.8 209 10;0 15 0,7 209 10, 06 0;7 20~ 102v ,:8 209 t0 0 o 143 lO 10.0 9,9 9,9 9,9 10 10,0 10,0 0~0 10 3 10 0 o 10 10 00 ~0 ~ :tO '~ I0 71b 0 718 0 2, ARCO ALASKA INC NUR~H SLOPE . ALASKA PAGE 8-FILE DEPTH * DIP DIP · DEV, DEV. DIAM D~AM · AZI. * AZI. ~-3 2-4 2748 2750 2752 2754 2756 2758 2760, 276~, 27~4, 2766. 2768 2770 2772 2774 778 2780, 27~2, ~UAL, INDEX BEST cA 3,1 40 0,8 211 10.1 10,1 A 0,$ 210 10.0 lO,O 2.U 199 0,8 209 10,1 10,I A 4,2 210 O, 8 207 10.0 10,0 A 2,1 179 0,8 206 lO,O 10,1 A 3,1 137 0~9 206 10.1 10,1 A 0,9 207 10,0 10,0 2,5 282 0,9 209 10.0 10,1 A 3,0 273 0,9 211 10,0 10,1 A 2,8 265 0,9 211 I0,0 lO,1 A 1,3 22. 0,9 211 10,0 I0 A 2 I 157 0 ~ 211 10.0 , 10' 10,1 , ARCO ALASKA INC NOAT?i 560P£ , ALASKA * DEPTH * [)IP DIP * DEV DEV DIA~ DIAM * OUA6 TOP 2187,73 17,8 239. 1,0 177, 13,2 13,6 C 2803.99 1.5 159, 1.1 215. 5,5 5,5 TOP 2187,73 26,4 255, 0,6 123, 16,0 13,2 C BOTTOM 2803,99 1.8 195, 1.! 213, 5.7 5.2 ************************************************************************* o.00 0.00 0.00 0o00 0,00 0o00 0,00 CPU ELAPSEO 13.1, 39.8 PAGE DIRECT ~UFF~]~ED FAOi~l'b I/0 I/0 447 195 36 DATE AXI~0.~4. L:gNG:TH .: 1024::: FILE TYF'F P~EV~OU$ l]i,;IT TYPfl CATE SiZg CODE C~ : ~RCi3 ALA~Kfi ~Ii,i¢" 000 000 Ole 065 Wi,~ : ~:R~ 26-7 000 000 008 065 Fi~ ~ g UPARUK gOO 000 OOU 065 p A~(';: '~; 000 000 u02 065 TO~,~: 1 1~ 000 000 004 065 SgCl' = 32 000 000 002 065 CO~ ~ ~ ,SI,OF~ 000 000 008 065 $i'A~: ~ LA~A Ooo uO0 eOb 065 CTR2: USA 000 000 004 065 LOP T i'.l.~ LSTEhD 3 7 5" TYPE FI:i IL) = X (2 PO[~Yt~ER ACC: D ~i ~ TTY OEP7 SP DII, CAI il.. [ DT T:'< D ~ H ~.:, [ b~ ClC3 NRAT I?Om 0 42 I O: 0 4 0 1 68 R~'~A [.0T 0 NPHI LDT PU 0 b8 2 0 O 4 0 1 6B PEF I ,,m 0 NCnb [.,~T cps o KATT [':PT DB/~ 0 0 0 0 0 4 0 1 TP[: ~'~,~ t,:8/~< u o u O 0 4 0 1 68 HO KPT ~ 0 0 0 0 0 4 0 1 SA F'pm V:~' 0 0 U 0 0 4 0 1 68 GR FPT ~APi 0 31 32 0 0 4 0 1 68 ~PHI P'PT Fu 0 ~ u 6 0 4, 0 1 6B FViI FP~ V DEPT 64~J2.. 5UOU Si;'LU 904.0000 IbD 2.5059 (!LN 2, O'lOiJ .$F 185,~00U (;~, 90,6675 DT -999.2500 .~R -999,2500 GR -999,250U CALl -999,~500 R~Ob -99g,2500 DRHU -999,2500 ) PCF - 99 9 P V : 0 F'VD F C 5! L PgF 5 -999 DEPT SP G~ TPL EPgl SP DRHtJ 99~,. 2:~nu PVli -qg'g. 2500 FVD 2.8105 l::.z 5,56:25 -g9~'2~o0 SA -99~.2500 FV'D 2,984~ TLr) 2 347'! IbM 12.7578 RjiOb 2.,316~ DRHO 3,8828 NPHI 46,6309 -99q.7500 CAI, I -g99 ~500 -999 2500 RNRA -999,2500 NPHi -Q%)9~75(,){) FCN~ -999,25~0 KATT -999,2500 SA -g99,25OO GR -09g,2500 MVD -q99,2500 2 5156 I8~ 2500 0723 ~706 0000 -O99 2500 -999 2500 -g99 2500 -999 ~500 2.7305 ILD t.7U21 Ih~ 174,0000 PT 115.6250 GR 12.757b DHOS 2.3477 DRHG 3.687b NPHI 42,6758 NCN6 -Q99.~5DO CAI, I -999.~500 R}iO~ -qg~.?~O0 RbRA -999,2500 ~PMI -qug,25~O FCN[, -990.2500 5:ATT 1,8467 174.0000 0 0688 1811~0000 =999.2500 29~9 2500 q99:2500 -999.2500 FVD -999,2500 GR EPNI GR. 632.00 ~0 6~ P .g F' -q99 '0 DEPT 5700 n 000 0 0 2500 R ftOF~ -999 0 '999.2500 EATT -999;2500 -999.2:500 :- :GR : "999 ~ 2500 '999,2500 GR 110 ~250 e .. NRA'f 3.2910 R~RA PCNb 'lO0.5Oou G~ DR~tO '999,2500 MRAT PEF' '999. 2500 ~'Cr. L TPI., -999.25nu F~PHI -~99.~b0t~ 3 34 -999 -999 -999 -9~9, -~99. 5273 IL~ ~.6895 9~,1250 ,0498 1309 NCNL 2406,0000 2500 RhO~ -999~500 2500 NPHI -99g,2500 2500 gATT -99g.2500 2500 GR -999,2500 2500 SP FC..~j L DRt40 TPb 9.8809 14.67°7 3.328i -99~ ?509 CAt.,I -999,2500 3,3013 TL~ 3,3652 96.2500 GR 91,0000 2.4i41 DR80 0,0283 33.3984 NCNb 2674,0000 -990.2500 R~OB -999.2500 -999.2500 MPMI -999,~500 -o99.~50u ~ATT -ggg.2500 -9~g,2500 GR -999,2500 -999.2500 5400 3.750u I~D 3.2695 TL~ 3,3750 L'I~ I"! 1111 i 1 iI:-I i[~ [:-.1 II~ G~ FCNL T PT GR SP FC~b 7 -q -9 53 5 -9 99 O0 98 76 99 99 0000 500 CALl 0000 GR 500 500 ~' 'V U 115 8750 CAI.! i 5:8 0~00 g:t( -999 51 uo 51- -999 -099 -9 -999 250() 5000.OO~O StLU -25.4844 1~,3750 CAI~I 4.3072 R~PA 4U~.5000 -~g9.2~00 -99q.2500 -999.2500 -99q.250o 49G0.nUf10 Spl,b -31.2500 G~ ~36.3'156 PAI, I 3,6543 ~A 523.50Pu GR VD 3 3 IhD -~99 0 CALl -9 -999 500 FC~ -' 999 0 FVD -99 3 ~617 !bO 3 15 71 RHO8 '99 CAbl 999 Nb -99g,2500 FVD -9~ 0 2 1 ILD !40 :~99 9~ -9 2500 R.NRA 2500 FCNL -999,7500 EAT 1.3359 IbP 1..634~ IbM I44.2500 DT 115,3125 GR 1.4.1875 RHOB 2.2344 D~HO 4,7578 NPHI 54 10{6 NCNL -999.2500 CALI -999:2500 RHOB -999,2500 RNRA -999,~00 NPHI -999.2500 FCNL -999.2500 E^TT -999.~500 SA -999.2500 GR -09q.~500 FVD -99g.~500 3.558o ILO 3.0488 IL~ 134.0000 DT 109,7500 GR 14.8516 RHOk~ 2.3887 ORHO 3.857~ NPHI 40.72?7 NCNb 117 0 0 - ,0 04'5 -999 -999,2500 1.4951 14~ 2500 0229 1944 -999 ~000 .500 -999 2500 -999 2500 -999 2500 3.1016 134,0000 0.0479 0000 PEF -999 G k 7 0 0 C A L ~, i 4 ~ PEF ""999 ~500 ;~ C ~>i~ [,~ '9 L ' " '~99 500 FV[i '999 '0 FVD - 0 4700 .0000 S~.'L<! 3 BP 6875 CA[,I !4 RHO}3 0 ~ 0GO0 G~,: -99O. 2500 CALl 2500 ~)CNB -990 FC~L 623,, 0 .... ;k 999 ~500 CALl 999,~500 RHO~ -099;2500 oa~a -999, ~5:0~ -9:99, ~:50:D: R~RA ' : NPHi : "999,2500 Pg~' -999.7500 ?<~C~.~b -099.2500 FCN[, -999,2500 gATT '999;2500 TPL -999,2500 ~4D 99. 2500 SA -999,2500: GR "999'2~00 EPNi -090.2506 F*~,~ -999.~500 FVD -999~500 r) c:p'i' 4560.ncov 5FI, u P.~.31b IbP 2.3BE7 lb~ 2,3~09 SP -36,7500 C'~:R 126,6875 DT 1. I~.~250 GR 126,6875 GR 139. <~Oc~(> CA[,I 15,4766 ~hg[~ z ~3750 DRHO 0,0566 NR~T 3.767u Ri~RA 3,7539 NPH1 41,4063 NCNB 2043,0000 FCYL 544.0u0o c::~ -999.2500 CALl -999.~50~ RHO~ -999,2500 DRHO -999.25o0 NaAT -999.2500 RNRA -999,~500 NPHI -999,2~00 . '9 . , '~ . .. P~:F' -O99 PS00 ~C~".b c)q 9500 FC IL -999 2500 FATT 999,2500 : TpL -999.~500 ~{D -999,2500 SA -999.2500 GR 999,2500 ~P~] -~9o.2bOO F~{) -99~.250U WvD -999,~b00 9 E ~' ~i' 44dO.OuOd S t~ t,i.~ 2.5~96 IBD 2.71~8 I~ 2 ~992 SP -36 7{g, GR 90.5625 DT ,05.2500 GR 90:,625 GR 9o:6~ 7b CAI, I 15. 3672 P MOi.~ ~. 3867 DRHo 0. 0757 NRA'i 3.4473 PNRA 3,3965 NPNI 36.6609 NCNb 2480.0000 FC~JL 730.nu(3G a~{ -990.2500 CALl -999.2506 P~iO~ -999.2500 PEF -9")9~o5~0~. , ' c'*,~t,.. '990~2500 F'Cr~L -~99.250,0 EATT -099',2500 TPL -999.2500 [~D -9¢9.2500 SA -999.2500 GR -9~9,2b00 EpHJ -999,2~00 ~',/~ 'q{:}q.250(J ~ -099.2500 4300 0000 S~'LU 2 5469 6250 CALl 15,0469 ~BOB 2,33 667 9000 Ga -999 2500 CALl -999 2500 PEF -999'2500 ~iC~ b -999 500 F{ - f -999 500 FYI.! -99q 2500 FVD -' O0 1,0 ~ t. 973 2, bM 4 FCN L 500 500 Gi< -9 0 CALl -999 PSO0 ~CML -999 0 L T 0 -999 ~500 W~I.~ - DEPT 4100 00()0 SFI,U 2 !LD 1 ~R 94 PS00 CALl 14.61. 2 RhOD 0 6 4000,0000 S~'!.i[i " ..... 2,2852 I'bD ::: :: <:: 2',4570 ~1'.,M 2,4102: : :::' : -41 5000 G .:, , .9.5 ~ I:875 113 ':5000: GR : .: .9:5:~ 1875 97,~750 ....... ~A[,I 14, 9687 R~ifl~ 2;2773 DRRO , 0;0498 ...6602 R~RA :3,912:1 NPHI 40'7715 NC.N~ 2094,0000 535. O(~Ot, C~ -q~ ' 2bO0 .... OAI, i '909,2500 RHOB -999,2500 -999,~500 ~ 9~ A ~ -999.2500 RNRA -999.2500 NPMI -999,2500 ' "999.~50u F:C. ~ b -99q.~500 KCNb -999,~50Q EATT -999.2500 -999~2500 HD -999 ~500 SA -999,2500 GR -999,2500 -ggo. TbnO F~! -09q~2500 F'VD -q~9,2566) D m P T N p, A OR HO TPL 39~0.0600 $~'{',u 3.2~71 IbD 3.o09u Ih~ 3,0840 -40,2500 GR 95.1250 DT 105.0000 GR 95.1250 94.5~25 C,~[,I 14.6~41 RaOD 2.357~ DRHO 0.0640 3.2598 RNRA 3.4844 NPHI 33,5938 NCNb 2182,0000 . . -,,an ~bO0 CALl -999 ~500 RHOb ~99 2500 626 O00U G~ ~.., . , -. . -999.2500 NRAT -999.2500 RNRA -999.2500 NPHI -999,2500 -099.2500 ~(:~:L -09°.2b00 F'CNu -999.~500 EATT -999.2500 -99~.2500 HC -999,2500 SA -999,2500 GR -999.2500 -099.25n0 FY:: -9u9.2500 FVD SP 3RCO.O~O(~ SFf,d 2.4375 7LD 2.6250 IhI.! 2 5469 -/~1.468~ Gl~' ~7 8125 DI ~13.8125 GR 87~8125 8q.6~75 C~' ~,i lq~226b ~'hfib ~.267b DRHO 0.0419 Od]PT 37G 0 DgPT ~C~Jb -999. 3600.0000 0 FVD G~ ~7.6250 C,~I.i NkaT 3 9375 R~.~R a 4 FC~[. 444: 2bag G~ -qgg D~H~ -999.2500 MRtT -999 TPT., -999. 2500 Ht.~ -99q OgPl' 3300.~u0(; SFI:U 3 SP -44.9i88 G~ 12 Gd 8q.5675 CAT, I N~AT 3.628~ ~RA 3 D~TTG -q99 2500 Naa,£ -999 3c~87 J,L,,_~ 2,9023 :: :::: ':::2 , 74'8~ ::' ,6250 :.!:,'I:'~ I I5,~125: GR ~7,6:250 ;2500 CALl -999,2500 8hag '999. 2500 2500 ::RN~A: '999, :7500 ~'C ~I'L -999,2500 EATt .2~ 0 SA 999.2500 G~ '999 ,2500 ~ 999, .~641 [~D 3o~891 Ib~ ] 1523 'nOnO RtiO~ 2 1.602 DRNu 0u747 . . I , 0742 NP~I 16,3379 NCNh 1810,~000 ~2500 CALl -q99.~500 RitO~ -g9g, .500~ .2500 RNRA -999.250v NPHI -999,2500 .250u FCNB -q99.250u EATT -999.2500 .2500 SA -999.2500 GR -999.2500 .250~ F~D -°99.250u .3867 ILD 2.513'1 IbM 2.4453 .0025 DT 129.3750 GR 72,0625 .4~44 RHOE 2.2~7b DRHO 0.0723 .7500 NP"i 40.4297 NCNb 1~8].0000 . 5oo cA,, - 9o.25oo - 9 ':5oo H I 9,4 ! 25(j 4.39. -999 ?50t~ NC~!b i5,5469 -99~ 9 Ypt:I I -qgq. 500 P~' -99 ~ C ~ L: 317.7 ~ 0 :,.; G ~< _ o 9a . DRHO -999.2500 ~,!N~ T -999. TPI, -999.2500 FiD -999 c~4.TbOb CAI i 14. 4.5273 g~Pa 4. S t. riOnt., r;k - 3 ~ 2. -0.0010 NR~.T 3 2,~ba7 13.9531 bid 9. 27. NRIT FCNi., EPNI F" V . 2506 't~ani -999.25'0(3 RHO~ -999, 2500 FCNb 'q90~2500 EATT 199g,2500 :2500 ::SA -999:,,~500 G,:R -999":2500 5"~0 F'~ 999; 4b!4 ThO i0.664i Ib~ P, 1562 6250: DT 126,7500 ~R 6~,6250 515~ F~ l~ 0 i.;; 2, !6c~9 DRIiO 0 ,0410 ls ,oooo }Sou CaL'i . .. 2500 RHnb 2500 RiqRA -999.2500 NPHI 1999,2500 2500 F"CNb -099~2500 EATT -999.2500 2500 SA -999,2500 GR -999.2500 2500 FVD -999.2500 3033 Ibm 5,9023 IbM 5,6211 250~ DT 120 5000 GR 74,2500 q~4 ~r]6 2~0449 DRHG 0,1162 558b NPNI 56.6606 NCNL 1512.0000 oonu ('ALi 6,1953 RHO~ 1,9160 7422 RNRA 4,0664 NPHI 50,4883 . 0" FATT 0uO0 FC~L -1713 00.~ 971,7500 2344 SA 0.9946 GR 76.6250 ~272 w?n ~.~2~2 5.1u10 TLr) 7.7109 TL~~ 7.7813 EPH1 ~EPT GR D EP T FC~b OEP'J[' SP NRAT FCNL DRHO pE~,TM TPL EPHi SP NRA? ~C~L 47 2 56 2500 0000 SFL, O ~9'5000 CaI, I 331, 23uO.OOno -32.28i3 GR 07,3{.25 CALl 4,1250 391.0000 0,0161 N~.AT ~q. 1002 2~uO.O00O S~LU -39.2U!3 GR 61.6563 Ca[,I 3,8418 R~RA 609 O, FC L :4 FVD ~ 9 15 1 7 RHO~ 65. 5 CALI 142 > 0. F V D 13.5547 7'7500 DT 3.g21.9 RHO~ 4.4766 66,0625 CALl 3,9961 1401.0UOu FC~L il.7109 SA 0.3201 Pv~ T 5 5~'539!1!:: NCnb: , 154 t0'.0078 ~OS 4%I328: NPHI .0449 GR 12.7578 IbM 3750 14 '2109. DRHO 49~8047 NCNb il,71~B ~:0000 NPHI 35 2500 EATT O.6259 GR 0.4160 1.3.5234 Ib~ 135.0000 GR 2.2949 44.3848 NCNb !2.2344 RHOB 58.000o 12 46BB 64 8750 0 0435 48 4863 2~2 4583 65 6875 13 5313 62~5938 0.0591 2288.0000 2.~992 E P ~ t Da. I: 2~, O0 PgF -999 2500 99g '2500 FVU -999 DEPT 2000 0 S.Ft, O 1 GR 54 5313 ~NL 2431.250 dR -999 PEF -999,~250o NCr~b EPMI -999. 500 FVU -g99. FYD 56 IbD o a ~ o ,:99~ ' ~$o:o' '.: :~:R ~'r ,g99 ~. ~ 590 ::::~<~A '., :~ ~ 99~, :~ 5:oo :.:~ :' ~ P-~ I : ~ ~9.,~,. ~.5oo P~2F ~999,2 b~'~ O. '~C'~' L. .. '099 . 500 FCN'L'.. - 9g'2500 EATT_ C ,'999;25009 :' TPL , .999,2500 HO ~9'99:,:2'5'00 SA "99:9, ~5:00 iR 99 , ~5:00 ~P}{t -999.2bOu ~'ti -990~500 F~D '999.2500 0000 SFI,O 4B.4063 lbo 53,4375 6250 DT 152,3750 GR 2070 RNPA 4.7148 NP~I 49,9023 NCNb 7bO0 Ci~ -999.250u CaLl -99g.2500 RNOb .2500 ~ l~l; ~99. 2500 RNRA -999 2500 .~Snu '~C~. L -v99~2500 FC~lb -999:2500 EATI ,2500 HD -999,2500 SA -999,2500 GR .25ou Fvt~ -999'250u FqD -g99,2500 47 8437 29~6406 -0 0029 99 50g -999,2500 -999.2500 -999,2500 D~PT 170 SP NRAT FCNL 37 Pt;F TPL -g9 KpH~ -g9 0 .,,J,~O Sr'Iu 52 6563 IhD 62,9062 Ih~ ~ 5000 GR 2~,0000 DT 153,6250 GR R~O000 CaLl 17.07~i ~H~B 1,9795 DRH~ 4.1523 R~RA 3 g316 NPNI 48.9746 NCNb 3.75~u Ck -999'2500, CALl -g9g, 2500 RNOB 9.2500 NR3T -99~,2500 R~R~ -999,2500 NPHI 9. 250u ~iC~!b -gg~. 2500 FCtIL -999. 9500 EATT q,2boO HO -999.2500 SA -999.25()0 GR o.~50U Fyi: -ggg.2500 FVD -99g.2500 54.8750 ~8,~438 O. 073 1470,0000 '999,2500 -999,2500 -999.2500 '999,2500 i60~ PgF R 0 C A t PgF -q9 ~'C~b 1400 0()00 SF[,Li 51 ]5r~2 CAI,I DF2P'I 1200. SP -7 3 0000 GF, 3B ] 3 lrSu CAT, i Mi~,A T 5.4805 RNRA FC~b 231 .~750 DRHO -999.2506 PgF -a~9.2bOo TPI, -999. 2500 ND ~pH.[ -99q.250u DEPl 11. dO. 0£:()0 St"L u SP -51. OOO~; GA GR ,~2.4 u t-~ 3 3 20. A T., I 250:0 :BN!RA ,:.: :: ."~:9:~::9:;. 2:!~:00: ::::NP:H:I : ':,~::9:~ 250(5 FCNL ' ~999,2500 EATT -999 0000 ILO 129. 7500 Tb~ 119,3't5:0 GR 3672 ,~PH 2500 CAL. -0991~00 RHO -o99.2500 F~D 9q.2500 44.53!.3 ;.lO7 31,0000 999; 2500 '999,2500 -999,2500 -999,2500 366.50~0 I[,D 738.5000 ILK 3~.3750 DT 78,8750 GR 20.82~1 PHOB 1.3~72 DRHO 5.5313 ~PHI 71,0938 NCN~ -99o. 2500 CALl -999. 2500 -99g.2500 R~RA -999.2500 NPHI -99q.2500 FCML -999'205 0 EATT -999.2500 SA -999.2500 GR -999.2500 F~D -o99.2500 112 7500 36 6250 -0 0i03 128] 0000 -999 2500 -999 ~500 -999 500 -999,2500 17a.0000 Ibr) 117.0625 lbt~ q2.4063 DT 113.7500 GR 2C.6563 R~OD 1.8398 DRHO 73,3750 39 7813 0:1006 PEF '999 500 ~I(:~,~ ~ -{ - T 900 317 5000 Gk; -999 2500 CALI -' 999 2 0 NC~tb -09 2500 FC - t 9 F V' !} 9' 0 F ¥ D - 0 D E P T 800 0000 S F" !,: il 1~ 3 ! 500 I L P NRAT : : 4 ' R FCNL 254. ~O(>O G~ ,99'9,'2500 CALl '999.'2500 ORHO -999' 2:500 : :: ""::999.. 25:00 RNRA: '99.:9 2500: N.P.:HI . 25'00 ~ATT PEF -~' 2~0 ~CH~ '999'; 2'500 FCNL ~9'99' TPL '999;,2500 HD" '999;2500 SA ', 999,2500 GR ~PHI -99g~25nO F'vU -999'~500 FVD -999'2500 DgPT 700.0000 $~'I, LJ 107.9375 IhD 11,4,6875 Ib~ SP -~9,0000 ~R 45 0 0 ~ ~00,25'0 GR NRAI 4.7539 RNPA 5,2930 NPHI 59,4727 NCNb FCNL 246.3750 ~R -99n.2500 CALl -999'2500 RHOB DRHO -999.2500 NRAT -99g,2500 RNRA -99q.2500 NPHI PEP -ggg.?bO0 ~iCNh -g99.2500 FCNL -g99.2500 EATT TPL -o99.~500 HD -ggg 2500 SA -999.2500 GR ~PMI -g99.250U Fy1. -999'2500. . FVD -999 .2500 DEPT &OO.OuO0 SFtu 151.875~ ILO 96.0000 Ib~ NRAT 4 6992 RNRA 4,9102 NPHI 58,7402 NCNb ~C~{I, 2'10.7500 GR -99~.2500 C~LI -999.2500 RHO~ DRHO -~gg.~500 g~A% -g99,250~ RNR~ -999.2500 NPHI P~F -9gg.2500 NC~,;t, -99g.250u FCNb -q9g.2500 EATT - ,00 ~ 999,25 O0 999;2500 '999,25:00 69.3750 4~,5625 ,0449 ~305,0000 999.2500 -999,~500 -99g,2500 -999,2500 62.3125 52,2500 0,0415 1327,0000 -999.2500 -999 2500 -g99:2500 ) ) D~PT 243 6250 GR -99q.2500 CALl - a 999'2500 NCUb -999 500 FC b - T Q F~U -9~9 2 F¥'D - 40~) 0000 $ 1735 OOOO I P 18 O0 IbM 962 O0 999 :500 ~,: ~:b -~)99.2500 -99Q.~BO() Y:~U -999 0 :i:: i! i :!i:ii:: :i ! i5::: :i :i: i :i ::i :i: :: ! i::: i: :i :L!:::i::ii! :!i:: :!: ::::: :: i:i !,: :i:i:~,,.;: :::: <::i:: :i::: :i:i:i: i:::: ::: < :i:: :i ::<:: i 906 RHO~ ~0 FC~,~,b P'I6, ~OOU C~,~ -099. 2500 CALl PEP -99~.25n~ ?,~C ~:~ L -99~.2500 FCN/, D~3PT :OO.{.}O00 S F!,:.~ bO.R750 ILD sP .sooo Ga s ,oo o DRHiJ -99g.2500 ~-iRAT -999.2500 RNRA P~F -9~9.,250o ~:C~,'b -999.~500 FCNL TPL -g99.2500 HD -99g.2500 SA D£P? 1i7.0oo0 SF!,U 0.9?07 TLr) SP -25.o00U GR 24.7188 DT G~ 24.7i8~ CAI, i I~.4063 ~iiOB ~RAT 5.2031 RNPA 5.4766 MPHI FCNL 238.!250 Gh -9~9.2500 CALl DR~O -999.~500 NRAT -999.~500 RN~A PEK -09°o75{!0 ~C~,:L -99q.2500 FCNg TP[, -999.~500 HD -ggg ~500 SA FPN1 -09q.~500 Wy1, 099:~500 F'~D -9 .... .9500 .~7,8125 NC~ g99,2500 NP['i.I :990. soo aTT -999.2500 Ga 999,2500 2000.0009 TL~ 19g.2500 GR 1.6152 DRHO 67 2363 NCNG -g99:2500 RiiOB -999.~500 NPHI -g99.2500 EATT -999 ~500 GR -99g:2500 30,1094 4~,000.0 .048~ 1359,0000 '999,2500 '999,2500 -999.2500 '999.2500 1.3389 28,5469 '0.4043 1305,0000 -999,2500 -999 2500 -g99:2500 -999.~500 [~ V P ; KUPARtJK OOO OOO OU8 .NG: 9ff; O00 000 002 065 mWN: 1 l-r,~ OO, U OOO O0~ 065 ;CT: .ix 000 000 002 065 'A~': kL, ~SKA ~00 000 006 065 'RY~ ~ISA OOg 000 O0~ 065 1 I 68 I 68 i 68 1 68 1 I 68 't 68 ) · ~ :~ : ~ ~)~ ~.. : ~ :~:: ~. : :: . :: _. :~::'~ ..: -999.2500 GR -999,250[~ . b~.~'J (;~ l~i 375(: [:,~ 125.5u2,.. G~ 1~8 750 2~;1 1250 C~Li 12,9 6b RH~B 2,3047 DRHO 0.0928 4, I ~-t ~{~'~n 4.11 .... ' ~ -9 2500 374 '2500 GR -999,25t~0 CALl -999, ~b00 ~HO~ 99, -999 25t:0 ~CNL -999 °5(~0 FCNL -999,2500 GR -99~ 2500 -999.2b~:~ 9~I I.~ -999.250L~ FAT~i -999.25U0 TPL -99~.2500 -q99.25~t= ~' ~',.. -g99.25(;() ~.;:r')~: -999"2500 ~/t.'V -999.2500 -999.2bOb qi~ -999,2500 -25.'15~.~ (;k 1~33.[;'5~t', [~1' I1~:,5000 GR !~3.2500 99q 2 ){:~0 F'¥r> O0 PI 570U.00{i~ SFLU 3.57h2 IhD 2.1465 105.1~'75 CALI 13,3359 Rt~05 2.4063 DRH~ AT 4,!25u ~.' ~, ~' ~ 4.7639 aPii~ 50.04~]6 :~L 446,25!~o Ga -999.2b00 CALl -999,2b00 ;F -999.25o0 NC~{D -999.2506 FCN~ -999.2506 -~99. ?b(~ F> 1'1., -999.2bC0 Y; a T'.t' -999.'250t TPI. 50O -99~.2500 9~,2500 b~'® 22 ,COOO -g99,2500 -99W.2500 -999,2500 -999.2b00 -999,250U 2.3770 9~ ~750 0:0~40 2122.U000 -999.2500 -999.2500 -999.2500 -999 000 ,0 000 3:'232,~ ~:,~i'~ 3':'32~i'i VF~I 33.5449 NC~{b ' 2420~0U00 -,~-,...25(',u F:,'~'I., -999;2590 [:TAT~~ 999,2500 TPi, ' -~99.2500 -999.25,,d ~ vk 999,250V >~Oh ',9~.2500 '~ii~,~V 999.2500 -999 2500 GR :Pi 5300.OOO0 5FLu ~.'9473 1L, D 3.2930 ILN .~,2187 ' -34.25~'u ~.;~ 103.3750 Pl~ 104.0625 GA lo3.3750 'aL 57~,0c~)0 Ga -999.2b00 Cibl -999.2500 RH~B -999,2500 (M(.~ -999.250v ~,'hi ~ -999.250(, P' ;'~'RA -999.2500 ~'~P~i -999.2500 ~' ' 2 b~t: f'CNL "999.2500 GR -999,2500 -'~99.25t:v Lib -999.25"'0 ~aTl: -999.2500 TPI, -999.2500 . ~ -99g.25913 SA -g99,250{; Ga -999.2500 EPH1 -999.2500 ; -999.2bU0 GA -999,2500 ~P'l 520 t.',. o O:~.v SFL~ 3,2(:,17 ILD 3.0723 ~ -~ 2. u_~ ;t. ,5 <.~ I IO' '15~V OT ] 12.8125 GF, 110.7500 ) F 4 ~b~: ~:at:',,,~'; :c'~: 'q9°, ~:0~ .~'~:~: :'~:~ 9'~00 :<~:~:B: '~99 - ........ 25 ~, .0 t<, ~,& :i ' 99 O r. ~, ~ :. ~ 7 . c 9. ?50 .' · ~(](i{) ¢,.; ~,~: 1i9,[~.25 '[>"l'. I i'5; 6~'~(; OR 1i9;8125 ......25 L:, (: U 'J l., b ~ G ;250 ~ F ;; T :i -9. 'c",~ 9.2 bob* ...... "' "; ~P~"" b '999,2500 :;.:,,. 2b, i:; :0: G,:R ~':999 i~. b 1~4;2590 !.'T' 115;,,~125 G~,~ 144,2500 'l:~. "/578 ¢:'Pt,~ ] 54~J. 016 F~C*'b 1,94a 0000 ~ ,&'~.:,~. ~ ~9'9::9.2-'~"{~.:: -C At~,~ :~:9~ B ~i[:~:~:. ,::. :',~9.~. 2500 -999.250{: ~'~<~ R A -999,2500 NPHI -999~2500 - 9'9 ~'~,2:,'5 :;,~ Oo, ~ :.. g b · t.,~' q ,. .... ;, :[CNbk...k !~ I':; ,, ;,; ':9:9::9:.999 .250(;2 5(,:8 ~:';[~,,, : :: .: ~:9:99_999 '. ~,5.002500 ~:" 99 99; 250u ?,'};,,~ Ot~ '999,2500 Mi l,~ V -999. 2500 ' 9:9:9 ~< 2500 I 136 52A.bOt'v -999 -999 109.75()0 GR ~34,.0000 3. 857<;. >:PHI 40;'1227 ¢,~C t,~ k, 2020;0000 -999.25C~0 CALl -999. 2500 Ei'iOB -999,2500 ...z~, : . .2bO,, [;Pr:,l '999'2500 -999.2500 FCNU '999.2b00 GR -9Y~.2500 -'9 "9.~.2bC'O r-~,,r~B -~99.2500 ~,"jr, V' -999.250U -999,2500 :PI' 'N L 2.h t50 ].LD 2.8398 I I-, ~ 2.8496 ,45.6 o','5 ~ I. 98.3i25 GR ~b,6~75 lg.lo41 P }iUi:, 2,3635 L)RMCt 0.0537 -999,2500 CALl -999.2b00 RHOB -999.2500 -999.2500 F'CNL -999.2500 {;g -999,2500 U 9~9 2~,)t,) FYi) -999 2500 N~'~[)R 999 IN'V -~' 2500 3. t,~ 0 3 b, R ~,i R A 5 6 ~ <~ ~,! P H 1, b 0 0 0 999 2.5{~(:) N!-<A'I 999 ,25f?0 Ri':;~A 0 -9 2500 -999 2b{;O '!)i'! -999 2500 'i' -999, TPb , -. .... U ~ I ~,~ V -999 2500 ~87b DT 116,1250 Gk' 126,6875 ~: 5'~: :;.:'C¢AI~:I:` , :,, :<.:~999;~:50;,0 :-:tRti:[~B'. :; 99'9 ~ 2500 ',2500 ~.:A'~'~' '999; 2'500 TPb '999. 2500 '999' 2500 :~A: ~ ;~999~;~500 EPHI 99~,2:500 'U ""999.2bleu t'Vl',, ~ -999.2500 Gk '999,2500 -3h,'/,.~.~ <,.~ 90,5025 i~~1 105'25L~U GK 9L~,5~25 99.8875 CAb] 15;3672 RHDB 2.3867 DR}lO 0,0757 ~15 F~";)~ ~ 3.3905 PPi-il 36.6099 NCNI~ 2480.0000 '3'0000 GR -999,2500 CALl -999.2500 RHDB '999,2500 730. -999.7b{~0 ',' R ~ J' -C~99.2bt)L: ~ ~ R ~ 99 2b0L: NPHI. -999,2500 -999,2500 NCN[~ -999,2500 FCNL -999,2500 GR -999,2500 -999.2br' D . 'i' P t, -999.2b00 ,.,b 'lb -999.25~)U ~/,AT~ -999 2500 -999.250u SA -999. 2500 G,R -999.~500 [;Pltl -999 2500 -999,2bU0 F~D -99~,25U0 ~ ;~ rD p: -999.250{; ~4li';V -999:2500 -999.25L~(' GR -999,2500 'P'I' 4300.00U3 5fi, U 2.54~9 1L, D 2.bttO II~ ~.6504 ' -39.25<';c: Ct{ _~3.750f D'.i 1%)6.6~7b Gl-{ 93.7500 999 'LI 4,000,0000 SFbU 9'1 * 8'150 CALi :P I iF 39o0, OO(~u SFLU 62~. OOO~ Gk -999,2500 ~99 9; 2 -_999,25(:10 C/~bI 999.25 (, C. P ~; ii -999.250U -999.2bt:'(~ -999.2500 CR -999. 2500 3 -999 -999 2 2 2 7 7'3 uR ~,~ o ,,o. 7 '11 b -999~25'0 NP}!I -999,2500 -999 ~ 2509 -999,2500 EPMI -999. 2500 3.009~ 1.05.0uoo 2.3574 -9~9. 2500 -~99.7500 qPi'! l -999.250U GR -99(~. 2500 ,4102 2u94,0o00 -999,2500 -999.2b00 -999,2500 -999,250U -999,2500 -999.2500 3,0840 9b.125~ 0,0640 21a2,00OO -999.2b00 -999.2500 3 -999 ~7 4.,0666 42,6758 21. OB 2, 0000 2500 00 ,P,(] -999 2590 U -999 2bUg ) ~F ) - -999.25~10 DTI, -99' .9.~:5g0 '999'~S00 GR 3500,0000 SFLU -%1.2 b'.3t2 86.5623 CAD~ 472,2500 G~ -999.2bO(.) ~.~A'.~~ -999,25o0 NCNb -999.2bou -999.2500 -999,2500 3400,00o0 -45. 625C ~ 115;8i25 Gk 15,3594 ~0~ 2.2559 4 2..3~j ~P!i[ ~5,~102 NCNL -999,2500 CALl RHOB -999.750(! RNRA -999.2500 FCN~ -999~'2500 -999.2bct~ EAT~ -999,2500 TPI, -999,~500 GR -999,2'b00 ~PHI -999. 250() ~!~[]R -999,2500 ~1~ -9,99,2500 3.164,1 tb9 3~2~9! IbM 86,1875 Dl 119;6875 GR 6250 2uO~: °371 OOOO -999~2500 -99~2500 -~9~2500 -999.2500 ~999,2:500 -99~.2500 523 8~,1875 .) [PT 3 109, OOi!C. SF b.!J 3, .345.7 ibm : 1,: 1504 ~7'.3/50 Ca:l~::/ i7,'21~ ~ R},lO~ 2,107:4 DRHO 0'0278 'aL 409.0~0u G~ -999.2500 CALl -999,2500 RMOB -999,2500 .}iO -999.'2obu~"" :',.:~A~ .... ,o~c:,. ..... ~5I~t~ i~,'~R/.:, -~9©©250U NP!{i -g99.2bO0 ;F -999,2b0~ ./~iCNL ~C,P L '999 2500 GR -999,2500 -999.2bi. t~ [)Tb b ~t'l.'T -999.25U0 TPI -999.2500 ' -999.2500 SA -999.2bOG GR -999.2500 f;PH I. -999,2500 ' -g99,2bO0 Ga -999.250u :PT 30U0.(1990 SFLo 3.3594 !hD 3.9727 II'.~M 3,6270 ' -,~S.25~,v G~.-, ~.25{,[.) ~'i' 130.7500 79.U125 CabI 17. ~o~ ~ biOB 2.0879 I..)RH O 0.1572 g'i g. bb~.'o M, ~:~ ~. 57,~ 2 ~',PH 1 bf.543u b, Ch' L lbqg.0000 iF 999.2bU9 i~C ~: b -999.2b00 FCNb 99 .250u GR -99~,2500 - ~ 99,2Dr,{/ D~',L -999.7 5(([ K a T'i' -997. 2500 7'PI~ -999.2500 ) 999 ,7 qB0 .9740 · 175i) ;PS :F ) 2600 56. 414.7500 GR 52.9375 CAL~ 2.5977 NCt'~L 1528.0000 F'CNL 12'i.2b('U [~'j.l .... 127 (~u(>C E'AT'I' 10.3'/5u Sg 1.4063 GR i2,2109 4'1.99i~C NC~'i b I0.1953 R~DB 4.4766 341 .2500 1~9 .5833 '.I' F t., b5.~125 EPMI t:~. 8q3'i 12,4219 0,~22b 175~, 000 2 ~367 54,1875 24,6908 'PT 1 37. 3750 t, 4.6875 5i17 15, 000 47 7051 Al' 4. 125b ¢'~.}..,! A 4. ~i 7(,t) .!i~.:'?{l 49. B047 i%,C!'-: L 175I ,0000 :..: ~ : . g: :~ :~"'~ : : %'?'. ::,:,:: : :~": ~:~: >,.:*~''~:~ : :: .: : ':g :?' : ~" !.': ~ :: :: : :; : :: 125, ~bt.:¢ l;ll. 1,24,25fl(~ EAT2 232.4583 TPI, ,:,. 1 , :g 0 ~'6:~:89.: ::GH: 6.5;6875-: gP~i'l 1 i. ~t0~ c ..... PT 2200.0000 SFLu I:3,5547: '.I:bD 1.3,5234: Ih~ : I3,5313 -39.2t~!3 Gl.{ 57,2~].3 1": ~f 135:0000 GR 62;5938 61,6~:3 ,,ALI 14,3516 R lOB 2'2949 DRBO 0591 ~L, 5~2.0000 (;~ 52, C,~O'O CALl I~.2344 ~aoa ~ B,J 0.00(:5 ,'~:~gi 3,957u ~' ~'p 4,3828 ~.if'}:i q. .1.992 - . ~ :', ,~ 5b 86 F 2.30~: ~C~L 1545,0000 FCNL 352,2500 GR 55,2500 ] 33.5(..ot.~ [~.t L, 132.(.'9o0 EAT'J 2~3.~583 TPI 1.~.5859 12.015t SA 0,9946 GN 49,6B75 ~:P~I 2b.9277 U O. 35'~: b ~'~[) O. '~.b I t~ ~' :,~Ok: 9.3099 ~4 It~ V 9.6797 12.0i5~ GR 49.687b :PT 2100.0fi06 Si:LO 7.3164 ILD 8.1875 ILIa /.9453 -3(;.5v~'b (;~: 52,256t; ["J 125.3750 G~ 0'i.1250 52.250(; CALl 17.2344 RhOg 2.2285 DRHO 0.0273 NL 259.50{)U (;~ -999.2500 CALl -999 2500 RitOB -999,2500 ;F -999.2b(:o ~{]kL -999,2500 FCNL -999,2500 GH -999.2500 -999.25i'~ I) ~'L, -999.75( g F.. ~'l' T -999.25U0 'rP[, -999.2500 ) AT AT ~0 -999. 2500 -999,25£i0 5 C' 0 A T H LJ F :-PT ~L :F - 59 . O 0 '(i 0 G R 2~.0000 CALl 4. 1523 37~,750u - 9 99.2 b ~.~ O r{ ~{ A T '99g,25gO -999.2b00 -999. 250~ 16UO.OO()O $[~ I,~U 28,625U bY 1 {) Gk 2 ,Ob 'i~ <~:?iMii89 ~:~ < P~$i~O~, ~ ::.7:. ,::: ~:/~,g.., ~, ~. 4'9,9'0 2 ~ N C ~ h 1 ~ 0 0 0'0 ~:~'::9 9 ~; ~ 9 9:;;;~'750 0 ': ;~ BOB: :::' ::' 9'9::~.,;250.0 ~9~9~ --99,250o N Pfil '999~2'500 25()0 EAT']' '99.q.250u' '~'~'IPI, . 99:2500 'q99, ~5 (';() ~,~.,',~()~ -999 ~ 2500 MI~,~V '999. 2500 999.2500 62,9062 Ii~ 54,8750 :1.53'6250 GR 38.3438 3' ('~3 q 6 ~" i:~H i. 4R~974b NCnb l~70.gO00 -999,2500 CAL~ -999.~500 RHOB -999,2500 -qgg.2bOv k~,~ R i.~ -999,2500 NPhI -999.2b00 -999,2500 P'CN~ -g99,~5~0 GR -999,~500 -999,25GO [,'AT(I' -99g~2500 TPL -999,2500 -999,2500 GR -999,2500 EPBI -999,2500 -99~. >'500 mi~Ok -99912500 ~iNV -999.2500 -999,2500 40.71~13 I!,D 33.43'15 ILM 30.B437 ,%7.b313 [)%' 149.7500 Gl{ 58.9062 2500 0 I 65 0 G R . HU ! ?:PT ? ~ A 'f ~ l-~j · -999.2500 ,r',i C N L -999 . ~50~ -999.25V0 174,0000 20 8437 -qgq' 250L~ -999. 2500 .., _. , ,. u -999.25(>0 -999. 2500 -999. 2500 366. 5000 ILD .38.3']50 i.)'£ 5.531. 3 ql.~?{I -999. 2500 CALl -99~. 25()0 FCNb -999.25{~ u EaTq' 29,7500 i9~.t750 G:R '! , 3672 [;RHO 1999,2500 -999.2bt~O TPI. -99g. 2500 -999.2500 Mil', V 31.3438 '0 0107 123! {l/O00 -999.25.0 -999 2500 -999 2500 -999 250(I -999,2500 -999.2500 738,5000 1,3672 DRHO 71,0938 NCNb -999.2500 -g9q.2bO0 -999.2b00 GR -999.2500 Ti'h 112.7500 0.0103 12~3.0000 -999,2500 -999.25u0 -999,2b00 L'~ i"11 ! i i l i, l:.] ii?_ [;.]1J P 010, H 02 ¥ ~!': ~:; .t !"' 1 C A T i 0 ;,~ .i., i ;5'? t N G e A G E 19 -999.2500 i',! .i$. A T -999,2 - 9 9 9,2 5 ~) C, ! ~ <[' b - 9 9 9 -9 51 .AI 4 .ILL) -999. 2590 U : -g99.7~5~{; i)!'U ' -999.25(3'0' EAT~ ""999.2'50{.i TPL '9'99,'2500 ~ - 999,25~0 : ~,999, ~50:0 Ga,. "999']~00 : EP.HI ':99'9, ~50'0 b -~. ~',,5:~ ~'~ ..... ~ .... 2:~tO ~,.3~ '999~2'500 MINV '99~,2500 ~ -999.2~ U ~ -999'2500 ~4,37 0 CALl 1 ' 5' '?227 i'~2Hl fl2~59'77 NCNb 1330,O000 ~54.~000 GR -999,2500 CAbI -999,2500 RH.OB -999,2500 -99g. 25,,~, h~,%~ -9991250o R;',~A -999.2500 NPHi -999,2500 -999.2500 NC~L -999,2500 FCNL -999'2500 GR -999,2500 -99'9.2b()~ ~[[i .... 999.2500 7:.aTT -999.2500 TPL -999.2500 -999.25u0 5A -999.2500 GR -999,2500 . . ,, r~f]~ -999 2500 ~ I ~'~ V -999,2500 -999.2500 GR -999,2500 £PT 7UL). 00~)0 SFbu 107,9375 IhO 114,6875 Ii~M 09.3750 ~ -,'~ 9,00 ~,,.: (~ 45 Oi) r'O DT 100,250r.) GR 45.5625 ) ) · 4 - a 9 9. '~ 5 0 O ~; A T'i ~9'9 9;:* 2~(;}.~::: ~ .. · ::. 9 9 · 2.500 -999 270,000U GR -999 ~500 CALl 999.25~0 RHOB 9~39.2' '~ -999' ~999~2500 NPHi 999.2~00 ~-,~CN h -999.2500 ~C,~h 999.2500 - qgq, '25,~ f)'il -999.25':)u ~;ATI q99~250U TPb -999.2500 ~a -999.2500 GR -999,2500 EPHI -g99.2500 GR -g99.2500 300.OOUo SFbO 294.2500 lbo 115.0625 IBM -'i~.o{:,.)u. {3~X 3'1.0o25 [}T 8'1 .5000 GR 3'1.002b CAt, t 20.8900 RHO~ 1.9346 !)RHO 4. 1~)~ ~: F: ~ ,!.~5i~ sPHi 57,22fl~ 215,5000 GR -999.2500 CALl -999.2500 RHOB -999.2b'.aO [~ ~ A .~.~ -9~9.250L~ R.~RA -999.2b00 -999.25t)~ NCNL -999.2500 YCNL -999,2500 2500 2:9~. ~500 30.5938 14UU.OOO0 -999,~500 -999,2500 -999,2500 999. 2500 '99~,~500 999,2bO0 59.7188 0,0225 l~q2,0000 :~99,2b00 9~.250o -999,2500 -999,2b00 - 999 . 2 ~ 00 N i~I A T -9 O0 AT 5 -99 -9' U -,9~ FfbEt TRAIbER ~ TAPE T~AIL~R ;RVICE NAME ,TE :~419'112i :IGIm :0000 ~PF i~E )NTINOATION IMMENTS :blB~NY TAPE ~TE :P~107/21