Department of Commerce, Community, and Economic Development
Alaska Oil and Gas Conservation Commission
Loading...
HomeMy WebLinkAbout197-129XHVZE
Pages NOT Scanned in this Well History File
This page identifies those items that were not scanned during the initial scanning Project.
They are available in the original file and viewable by direct inspection.
/ ~ 7-/2 ~' File Number of Well History File
PAGES TO DELETE
RESCAN
Color items - Pages:
r~ Grayscale, halftones, pictures, graphs, charts-
Pages:
[] Poor Quality Original- Pages:
[] Other- Pages:
DIGITAL DATA
[] Diskettes, No.
Other, No/Type
-OVERSIZED
.Logs of vadous kinds
Other
Complete
COMMENTS:
Scanned by: Bedew MiidredD'aretha~~Lowell
TO RE-SCAN
Date.: ..~/~,. .. Is/
Notes:
Re-Scanned by: Beverly Mildred Daretha Nathan Lowell Date:
STATE OF ALASKA
ALASKA~ AND GAS CONSERVATION COM~ION
~~~~I~G4.J
~-G~
JUL ~ 5 200g
WELL COMPLETION OR RECOMPLETION REPORT AND LOG
~iaxka Oi6 ,~ Ga~ Cuns. Cnmmissic~r~
1a. Well Status: ^ Oil ^ Gas ^ Plugged ~ Abandoned ^ Suspended
zoa,a,c zs.~os zoanc ss.>>o
^ GINJ ^ WINJ ^ WDSPL ^ WAG ^ Other No. of Completions Zero 1b. Well Class: ~~ Q~~
~ Development ^ Exploratory
^ Service ^ Stratigraphic
2. Operator Name:
BP Exploration (Alaska) Inc. 5. Date Comp., Susp., or Aban~,~,f .
6/22/2009 ,~'~ 12. Permit to Drill Number
197-929 - 309-099
3. Address:
P.O. Box 196612, Anchorage, Alaska 99519-6612 6. Date Spudded
07/30/1997 13. API Number
50-029-21770-01-00 -
4a. Location of Well (Governmental Section):
Surface:
'
' 7. Date T.D. Reached
08/13/1997 14. Well Name and Number:
PBU 07-28A ~
394
FNL, 339
FEL, SEC. 33, T11 N, R14E, UM
Top of Productive Horizon:
360' FSL, 1815' FEL, SEC. 21, T11 N, R14E, UM
8- KB (ft above MSL): 53.25'-
Ground (ft MSL): 22'
15. Field / Pool(s):
Prudhoe Bay Fi~ld / Prudhoe Bay
Total Depth:
843' FSL, 4362' FEL, SEC. 21, T11N, R14E, UM 9. Plug Back Depth (MD+ND)
11896' 8994' Oil Pool
4b. Location of Well (State Base Plane Coordinates, NAD 27):
Surface: x- 675842 y- 5950523 Zone- ASP4 10. Total Depth (MD+TyD)
14392" 8991'_ 16. Property Designation: ,
ADL 028309 & 028306
TPI: x- 674212 y- 5956521 Zone- ASP4
Total De
th: x- 671653
- 5956945 Zone- ASP4 11. SSSV Depth (MD+ND)
N/A 17. Land Use Permit:
p
y
18. Directional Survey ^ Yes ~ No
Submit electr nic n rint d informati n r 2 AAC 25.050 19. Water depth, if offshore
N/A ft MSL 20. Thickness of Permafrost (TVD):
1900 (Approx.)
21. Logs Obtained (List all logs here and submit electronic and printed information per 20 AAC 25.071):
MWD / LWD, GR RES, CNL, DEN, Sonic
Z2. CASING, LINER AND CEMENTING RECORD
CASING SETTING DEPTH MD SETfING DEPTH TVD HOLE AMOUNS '
WT. PER FT. GRADE ' TOP BOTfOM TOP BOTfOM SIZE CEMENTING RECORD PULLED
0" 91.5# H-40 urf 110' Surf 110' 0" 2 38 # Pol
1-/" #/ # K- / L-8 1' 9' 17-1 /" ~oo SX cs m, soo SX ~c'; Top Job: 200 sx CS I
9-5/8" 47# L-80 urface 99 3' rfa 8 43' 12-1/4" 75 sx CI 'G' 4 sx CS I
7" 2 L-80 9847' 1 561' 7 2' 8379' 8-1/2" 170 sx CI s'G'
4-1 /2" 1 L- 0 41 ' 14 1' 1' 4 1 I
23. Open to production or inject ion? ^ Yes ~ No 24. Tue~wc RecoRo
If Yes, list each i
(MD+ND of To
& Bottom; Pe nterval open
rforation Size and Number): SIZE ~EPTH SET MD PACKER .SET MD
p 4-1/2", 12.6#, L-80 10401' 10346'
MD ND MD TVD 2-7/8", 61.6#, L-80 11930' - 12410' 12410'
ZS. ACID, FRACTURE, CEMENT SQUEEZE, ETC.
~'~~~~~4~~~i
~~~ j~', ~~~~~ DEPTH INTERVAL MD AMOUNT Ht KIND OF MATERIAL USED
~ 11896' Set Whipstock
11896' Pumped 07-28B Liner Cement 06/29/09 (P&A)
(See 07-28B Completion Report for details)
ZF). PRODUCTION TEST
Date First Production:
Not on Production Method of Operation (Flowing, Gas Lift, etc.):
N/A
Date of Test: Hours Tested: PROOUCTioN FoR
TEST PERIOD OI~-BBL: GAS-MCF: WATER-BBL: CHOKE SIZE: GAS-OIL RATIO:
Flow Tubing
Press. Casing Press: Ca~cu~aTeo
24-HouR RnTe• OIL-BBL: GAS-MCF: WATER-BBL: OIL GRAVIN-API ~CORRJ:
27. CORE DATA Conventional Core(s) Acquired? ^ Yes ~ No Sidewal l Core s A uired? ^ Yes ~ No
If Yes to either question, list formations and intervals cored (MD+TVD of top and bottom of each), and summarize lithology and presence of oil, gas or water
(submit separate sheets with this form, if needed). Submit detailed descriptions, core chips, photographs and laboratory analytical results per
~ ~Ui~PLETiON ~
None -U
Form 10-407 Revised 02/2007 ON REVERSE SIDE 7~
y ~ .~~..~~ ~ w ~o~s ~`~~~ ~ ~ ~~ G
ZS. GEOLOGIC MARKERS ~LIST ALL FORMATIONS AND M RS ENCOUNTERED~: Z9. FORMATION TESTS
NAME M ND Well Tested? Yes ~ No
Permafrost Top If yes, list intervals and formations tested, briefly summarizing test
Permafrost Base results. Attach separate sheets to this form, if needed, and submit
detailed test information per 20 AAC 25.071.
Sag River 10565' 8380' None
Shublik 10636' 8412'
Sadlerochit 10762' 8467'
Zone 3 11138' 8632'
Zone 2C 11202' 8663'
Zone 26 11329' 8732'
Zone 1 B 11757' 8948'
Formation at Total Depth (Name):
30. List of Attachments: Summary of Pre-Rig Work and Daily Drilling Reports, Well Schematic Diagram
31. I hereby certify that the foregoing is true and correct to the best of my knowledge.
~7
Signed Terrie Hubble Title Drilling Technologist Date
f ~ ~
PBU 07-28A 197-129 309-099 Piepared By Name/Number. Tenie Hubble, 564-4628
Well Number Permit No. / A rOV81 No. Drilling Engineer: Charles Reynolds, 564-5480
INSTRUCTIONS
GeNew-~: This form is designed for submitting a complete and correct well completion report and log on all types of lands and leases in Alaska. Submit a
we~l schematic diagram with each 10-407 well completion report and 10-404 well sundry report when the downhole well design is changed.
IreM 1a: Classification of Service Wells: Gas Injection, Water Injection, Water-Alternating-Gas Injection, Salt Water Disposal, Water Supply for Injection,
Observation, or Other. Multiple completion is defined as a well producing from more than one pool with production from each pool completely
segregated. Each segregated pool is a completion.
ITea~ 4b: TPI (Top of Producing Interval).
IreM 8: The Kelly Bushing and Ground Level elevation in feet above mean sea level. Use same as reference for depth measurements given in other
spaces on this form and in any attachments.
IreM 13: The API number reponed to AOGCC must be 14 digits (ex: 50-029-20123-00-00).
IreM 20: Report true vertical thickness of permafrost in Box 20. Provide MD and TVD for the top and base of permafrost in Box 28.
Ire~ 22: Attached supplemental records for this well should show the details of any multiple stage cementing and the location of the cementing tool.
IreM 23: If this well is completed for separate production from more than one interval (multiple completion), so state in item 1, and in item 23 show the
producing intervals for only the interval reported in item 26. (Submit a separate form for each additional interval to be separately produced,
showing the data pertinent to such interval).
IreM 26: Method of Operation: Flowing, Gas Lift, Rod Pump, Hydraulic Pump, Submersible, Water Injection, Gas Injection, Shut-In, or Other (explain).
IreM 27: Provide a listing of intervals cored and the corresponding formations, and a brief description in this box. Submit detailed description and analytical
laboratory information required by 20 AAC 25.071.
IreM 29: Provide a listing of intervals tested and the corresponding formation, and a brief summary in this box. Submit detailed test and analytical laboratory
information required by 20 AAC 25.071.
Form 10-407 Revised 02/2007 Submit Original Only
• •
07-28A / 07-28AL1, Well History (Pre Rig Sidetrack)
Date Summary
3/24/2009 T/I/O = SSV/50/vac. Temp = SI. MITOA TO 2000 psi w/triplex PASSED (Pre-CTD). OA FL @ 108'
(7bbls). A/L disconnected. Used 6.9 bbls diesel to pressure OA to 2000 psi. OA lost 0 psi in 1st 15 min
and 20 psi in 2nd 15 min. Repressured OA to 2000 psi. OAP lost 0 psi in 1 st 15 min and 10 psi in 2nd
15 min for a total loss of 10 psi in 30 min. No change in IAP. Bled OAP to 0 psi. Final WHPs =
SSV/50/0. SV, WV, SSV = C. MV = O. IA, OA = OTG. NOVP.
4/15/2009 WELL SHUT IN ON ARRIVAL. CURRENTLY RIH W/ 225" CENT & SAMPLE BAILER.
4/16/2009 QRIFTED W/ 2.25" CENT, S-BAILER TO DEV. AT 11,972' SLM. (no sample) LEFT WELL SHUT IN --
TURNED OVER TO DSO.
4/18/2009 T/I/0=2300/0/0 Temp=Sl Load Tbg (Pre CTD) Pumped down Tbg with 3 bbls of ineth followed with
200 bbls of crude to load for upcoming E-line job. FWHP's=Vac/0/520. SV, WV, SSV Shut. MV, IAV,
OAV Open.
4/18/2009 WELL SHUT IN ON ARRIVAL. INITIAL T/I/0=0/0/580 JET CUT 2-7/8" LINER STRADDLE WITH
2.125" SLB POWERCUTTER AT 11930'. WELL SHUT IN ON DEPARTURE. FINAL T/I/O = 0/0/0 JOB
COMPLETE.
4/20/2009 T/I/0= 0/0/0 Pressure test tree valves to 5,000 psi. Pre Nordic.
5/4/2009 Service the tree 30%. Pressure tested swab at 5000 p.s.i. for 5 minutes, and it bled down 100 p.s.i.
Pumped open SSV and pressure tested wing and master at 3000 p.s.i. for 5 minutes, and it bled down
100 p.s.i. All valves are in the closed position, flagged and master is locked out.
6/16/2009 T/I/0=0/0/0. Set 4-1/16" ISA BPV thru tree, pre Nordic 1. 1-2' ext used, tagged @ 96". No problems.
Page 1 of 1
~ •
g p Page 1 '
Qperations Summary R~port
Legal Well Name: 07-28
Common Well Name: 07-28 Spud Date: 1/22/1988
Event Name: REENTER+COMPLETE Start: 6/18/2009 End:
Contractor Name: NORDIC CALISTA Rig Release:
Rig Name: NORDIC 1 Rig Number: N1
Date From - To Hcaurs Task Code NPT Phase Description of Operations
6/19/2009 00:00 - 10:30 10.50 MOB P PRE Move rig from G-16A to DS 07-28B.
10:30 - 13:00 2.50 RIGU P PRE Accept rig at 10:30. NU BOP. PU reel
13:00 - 15:00 2.00 BOPSU P PRE TEST BOP. Witnessing test waived by Bob Nobel of AOGCC.
Install hard line in reel.
15:00 - 21:30 6.50 BOPSU P PRE Continue testing BOP. C/O B/S seals and grease HCR.
Good test on all valves.
21:30 - 21:45 0.25 BOPSU P PRE SAFETY MEETING, re: MU & PT lubricator, pull BPV.
21:45 - 23:30 1.75 RIGU P PRE Pull BPV with lubricator.
23:30 - 23:45 0.25 RIGU P PRE SAFETY MEETING, re: Pulling coil across
23:45 - 00:00 0.25 RIGU P PRE RU to pull coil.
6/20/2009 00:00 - 01:45 1.75 RIGU P PRE Pull coil across. Install Baker slip on connector. PT and pull
test CTC.
PT hardline to tiger tank to 3000 psi.
01:45 - 03:00 1.25 RIGU P PRE RU to pump slack out of the coil.
Pump 359' of eline out of coil.
03:00 - 04:00 1.00 BOPSU P PRE Pressure Test Inner Reel Valve
04:00 - 04:15 0.25 FISH P DECOMP SAFETY MEETING, re: PU Fishing Assembly
04:15 - 05:15 1.00 FISH P DECOMP PU Fishin Assembl with 4" GS Spear, Hyd Discon.,
Bi-Directional Jar, DBPV, & 2 jts 2-3/8" PH6.
05:15 - 10:00 4.75 FISH P DECOMP RIH no returns. Pumping 1.03 bpm. 55psi.. At 10300 up wt
~ 49.5K, Dw Wt.20K. Circulate 39 bbl hi vis pill to perforations
displace with 80 KCL C~3 2.57 bpm. Attempt to latch. Well on
vac. Fluid rate suckin out of CT ossibl reventin GS fr
latchin u. Fill across the top of well allow CT to "U" tube. PU
wt 47 K. Well Full 1.57/ 1.12 bpm. After multiple attempts No
latch u . POH
10:00 - 12:00 2.00 FISH P DECOMP POH.
12:00 - 13:30 1.50 FISH N DECOMP GS spera has 360 degree ring mark on nose 2.5" in diameter.
Discuss with PE decide to RU slickline. Wait on LIB.
13:30 - 15:00 1.50 FISH P DECOMP RU slick line. Wait on LIB, Wait on angle drive for counter.
15:00 - 17:30 2.50 FISH P DECOMP Wait LIB . LIB not usable. Decide to run GS on slickline.
17:30 - 21:00 3.50 FISH P DECOMP Run 4" GS on slickline. Latch on to fish successfull . Jar u to
release. POH LD slickline tools. RD slickline
21:00 - 21:15 0.25 FISH P DECOMP SAFETY MEETING, re: PU Fishing Assembly w/ Slickline 4"
21:15 - 21:45 I 0.50) FISH I P
21:45 - 23:30 1.75 FISH P
23:30 - 00:00 0.50 FISH P
6/21/2009 00:00 - 02:15 2.25 FISH P
02:15 - 02:30 0.25 FISH P
02:30 - 05:45 3.25 FISH P
05:45 - 09:00 325 EVAL N
09:00 - 09:15 0.25 EVAL P
09:15 - 09:45 0.50 EVAL P
09:45 - 10:30 0.75 EVAL P
10:30 - 11:05 0.58 EVAL P
11:05 - 11:50 0.75 EVAL P
11:50 - 13:05 1.25 EVAL P
13:05 - 13:33 0.47 EVAL P
DECOMP PU Fishing Assembly with 2 jts 2-3/8" PH6, DBPV,
Bi-Directional Jar, Hyd Discon., and 4" Slickline GS Spear.
DECOMP RIH
DECOMP Up Wt = 50k# ~ 10,200'. Fish Wt should be -9500#.
Latch onto Fish ~ 10,402'.
PU to 68k# 3 times; fish is not coming.
PU to 68k# & Jar up; Jar up total of 5 times to free fish.
DECOMP POOH with Fishing Assy.
DECOMP PJSM for LD of fishing BHA & 2-7/8" liner
DECOMP Stand back injector & L is ing 2-7/8" liner.
WEXIT Waiting on Slickline unit to complet activiYy on 7-14.
WEXIT PJSM for RU of slickline.
WEXIT RU slickline
WEXIT RIH with 2.85 WL drift to too of liner fish at 11916 WLM'.
WEXIT POH with drift.
WEXIT LD drift and PU caliper.
WEXIT RIH with caliper log.
WEXIT Wait for fingers to open
Printed: 6/29/2009 3:06:37 PM
~ ,
' gP Page 2 ~.'
Operations Summary Report
Legal Well Name: 07-28
Common Well Name: 07-28 Spud Date: 1/22/1988
Event Name: REENTER+COMPLETE Start: 6/18/2009 End:
Contractor Mame: NORDIC CALISTA Rig Release:
Rig Name: NORDIC 1 Rig Number: N1
Date From - To Hours Task Cod~ IVPT Phase Description of Opsrations
6/21/2009 13:33 - 14:12 0.65 EVAL P WEXIT LOG out of hole 50' min. to 10,000.
14:12 - 15:30 1.30 EVAL P WEXIT POH. C~ 150 fUmin.
15:30 - 16:30 1.00 EVAL P WEXIT LD memory caliper. RD slickline unit.
16:30 - 17:00 0.50 EVAL P WEXIT PU WS drifting Assy.
17:00 - 18:50 1.83 EVAL P WEXIT Drift hole for WS to 11,930'
18:50 - 21:00 2.17 EVAL P WEXIT POH
Conduct PJSM for LD of WS drift BHA while POH
21:00 - 21:25 0.42 EVAL P WEXIT LD WS drift BHA
21:25 - 22:15 0.83 EVAL P WEXIT PJSM for Pumping slack & cutting coil
Pump slack & cut coil
Cut 375' of coil
22:15 - 00:00 1.75 EVAL P WEXIT MU S~B CTC & test
6/22/2009 00:00 - 00:15 0.25 WHIP P WEXIT PJSA for PU of WS setting BHA
00:15 - 00:50 0.58 WHIP P WEXIT PU WS BHA
00:50 - 01:30 0.67 WHIP P WEXIT Test Baker tools ~ surface
01:30 - 04:40 3.17 WHIP P WEXIT RIH with WS
Log tie in -9'
Start CCL Log @ 11,592' to 11,911'
04:40 - 05:00 0.33 WHIP P WEXIT Set WS 45deg LOHS ~ 11,911', Pressured up to 1500psi &
set down W/2000k1bs
TOWS ~ 11,895'
PT WS packer to 2,OOOpsi
05:00 - 08:00 3.00 STWHIP P WEXIT Swap well over to Milling fluid 2%KCL W/ 2ppb Biozan ~
2.6bpm
, POH
, 08:00 - 09:00 1.00 STWHIP P WEXIT LD WS running tools.
' 09:00 - 11:00 2.00 STWHIP P WEXIT RIH Tag XN at 10 394' uncorrected.
11:00 - 11:35 0.58 STWHIP P WEXIT Mill XN nipple. 2.53/2.61 bpm C~ 1860 FS= 1760 psi. 2 stalls
total.
11:35 - 11:50 0.25 STWHIP P WEXIT PU ream thru. Pu Run thru dry No problem.
11:50 - 12:05 0.25 STWHIP P WEXIT RIH to 11600'.
12:05 - 12:30 0.42 S7WHIP
---_ ~ P
:.___a._..
-- WEXIT
---- Tie - in -7 correction
.
12:30 - 00:00 11.50 STWHIP P WEXIT RIH tag WS at 11896. 2.49/2.56 bpm 1900 psi
Start time milling from t 1894.4, See MW at 11894.5 get
pattern established.
Mill per time schedule .1ft per 6 min.
time depth circ pressure DWOB
13:15 11894.5 2355 1.47 Start of
continuous motor work.
14:04 11895.3 2208 1.61
15:05 11895.7 2175 1.82
16:15 11896.6 2205 2.90
17:10 11897.0 2219 3.38
19:10 11898.0 2216 3.76
Stacking weight, PU. FS = 1970.
Mill from 11896' with 300-400psi of motor work.
21:00 11897.7 2360 3.30
21:50 11898.3 2260 3.42
22:00 11898.4 2250 3.42
22:35 11898.9 2305 4.01
22:50 11899.0 2280 4.01
23:30 11899.1 2285 3.95
Printed: 6/29/2009 3:06:37 PM
~ ~ut~~.~r~u= rmrc:.
1CYtlATOR = AXELSQN
:E~, ELE1( a. 53,25`'
3F'. E[.~11 ~
~ ;o ~~} - ~ass° ~o~°~ car~aucTr~~,
'I ~~ :~fl~i~ ss ~ ~2oa~~ sa.~, r~-~,
}atumMl?.- .,rvrvµ 1t55~` 1£?= t9.124"
~aturn 7Vi~._..~_. ~ W ~...
- 884Q' SS
' 3-31~" GSG, £'r8#. K-5:i (1 J(76t~T"}. I~ =12.415"
~~rv ~ta~r~s: o~an~t,. w~.~~~ ~o~
~ Wt~1 BEI..t~W t~.
'~
^
4-it2" CRMC(3 SSSV N[P. It~ = 3.81 ~"
~~-~~8,~ c5~, ~2~, ~-80„ iD = a 2.sa~' 329~`
[C1C U ~~ = ~.~ " '~'~,~"~~'
~~L~ ~~ ~ fi ~ ~
~TC?P €3F 7" LNR ~~I
9-5.18°. CS~, 4T#, L-8tY, I€J = 8.58~ " rr~6! csut ~v in~r~~~
GAS LI~'~'M1iNDRELS
ST MC7 °CVQ} dEV 7YPE VLV ~ATCH ~7RT [~ATE
' 1 384Q 3413 33 IV~4'(G CN1AY RK Q 041I?110&
~ 7~4i38 6{~9 4~ tt~PAG C~?TY RK ' t7 04/Q'! f(?8
' 3 9743 7$5Ci 38 MMG [?MY RK tl C741~f1/{)$
9'UY[ r .7V`ti f ~ 9-,~]~$" X~'~ ~''+~, B~{R ~~P ~~.~ ~Q ~= ~.rJ~~},.
'~ i}Q2'3~ 9+867' $.34 3" BlC~i' Ht,~l~ HGFt, 1~ = 6.25C1° '
9867' ~.~~ 3~~ x ~^° x~, ~~ = s. ~ s4~~
PE}~~f?FFtAA~'IUtJ SIS~'JIMARI''
~EF Lt~G: ~Ftt~S C~~I ~f2~1 {~JB~
t~~~E~T~C7~*FsERF: 94° ~ t~~~4'
~iot~: ~tefer to Praducti~n ~B far hisf~r~cal perf r~ata
StZE SFF ItUTERVAL t}pnlSqz 13A'[E
2" ~a t 2~2C~-128?~ ~ t~71Q~ 1t~~!
2" 6 t 2~2{l-~ 331 ~i t7 Q71t7 t ft}~
2" F 43 '-1~~4t} t3' 177/~Tf~t9
4-112" T~3G, t 2.6~, L-80, .47152 bpf , 1D = 3.9~8" ~--i 1 U4~'~ ~~
7" LIYR, 26#. L-8Q„ .0383 bpf, l~ = 6.276" 1~~1' ~
Tt3F' ~-1;?'~ X ~-3}16"' iC ?_7JS" ~N~$ 1150~' ~
~#-tf2"' 1rVHlPS`CUCK '('~$~~i° ~
TUP t~1= 2-7f~"` LN~-~IIT~ "I1 ~3~` .....'~
1'195~`-'~2294" F~RFS ~~~'
2-718" I.IVR, 6.1f's#, L-$CE. .Q055 bpf. ID= 2.372" 1Z41~1c ~
10~' J-~7 X 4-312 BKR SS-3 RKR ID 3.875"
103'T9` ~4-112'" FiES XN NiF', ID tr~lle~ tts =:3.~~',"
1 C}3~~' 7"' X 5-314" ~MCR ZXF FKR
~
13739` PBTD
'\ 1~1 ~'~' 3-3116 x 2-718 XU, !~ = 3,19°'
w 17.17" TIEBACK, ~ = 4:413"
~040"1' ~3-112'" 11VLEG, ID = 3 958"
Ei.MU T1" N~T LOGGEU
~ V'f'Sf4i ....... ~~ ~ ~Jn ~C. }"~~~1~ ~~} ~ ~,~~" .....
1{}4'~ ~` 5'• X 4-1 l2" XO, ID = 3.93T'
115(IfD' _ 4-1i2" KB PKR WI SEAL STENi, [D = 2.377„
115~6# 3-1J2" DEPL(~YME~1~ SLV, ID = 3.04,~
1"1~'~3` ~{!~d a~ut ~aushing 1D = ~,3p„
~ 4_1 t2" X 2-7/8" TlW' KS A HCHt3R , ID = 2,371 "[
~~}-'112" LNR, 12:6#, L-80. .Q152 hpf. ta = 3.~58'• ~-^~ 1439"[` ~~~5~~ ~
_ _ t3~-28A
C1AT~ ' REV BY CC}MMENTS E1A7E REV SY COMMENTS PRUDHC3EBl#Y tlt~l~
fl8l2o188 f2~WAN di p141CIhW~, C(?MPl.ETIUN WELL Q7-28~
0$119I57 [1141 SIDEfFLACK {1}7-28A) PERMff No:
it7f311~l2 ENQ~~ 1 CTDS[[3E['~CFC{Q7'-28AL'I: APINo. St~-tl2~-21770-Q2
+~?lii21UJ NC3Rb1~ 1 CTD St~ETFtAC~f ~4T-28B) 5EG 33, T11 ht, R1-0E. 3~4" FF~L ~ 339" FE[.
t~71f7d1t79 ' ?J5V DRLG H{3 ~ORf~EC714N5
ElRErenforatiun tAlaskal
•
SARAH PAUN GOVERNO
R
~S~A ~~ ~ va.-7 333 W. 7th AVENUE, SUITE 100
COI~TSF.RQA'1'IOI~T COMMISSIOI~T ANCHORAGE, ALASKA 99501-3539
PHONE (907) 279-1433
FAX (907) 276-7542
John McMullen
Engineering Team Leader
BP Exploration Alaska Inc~~`,;~,'~~ '' MAC' ~ ~~ ~~~ (~'
PO Box 196612 ~, `~' I
Anchorage AK 99519-6612
Re: Prudhoe Bay Field, Prudhoe Bay Oil Pool, PBU 07-28A
Sundry Number: 309-099
Dear Mr. McMullen:
Enclosed is the approved Application for Sundry Approval relating to the
above referenced well. Please note the conditions of approval set out in the
enclosed form.
When providing notice for a representative of the Corrunission to witness any
required test, contact the Commission's petroleum field inspector at (907)
659-3607 (pager).
As provided in AS 31.05.080, within 20 days after written notice of this
decision, or such further time as the Commission grants for good cause
shown, a person affected by it may file with the Commission an application
for rehearing. A request for rehearing is considered timely if it is received by
4:30 PM on the 23rd day following the date of this letter, or the next working
day if the 23rd day falls on a holiday or weekend. A person may not appeal
a Commission decision to Superior Court unless rehearing has been
requested.
Sincerely,
Daniel T. Seamount, Jr.
Chair
~. J
DATED this Z~ day of March, 2009
Encl.
P ~ ...~Gr~rs '
"~ VI'~' ~ STATE OF ALASKA .,~ ~ ~~~
,~ ~,~,3~ Al~ OIL AND GAS CONSERVATION COM~SION ~'
~ti~ APPLICATION FOR SUNDRY APPROVAL~~~~~ ~ ~JC)9
20 AAC 25.280
1. Type of Request: ®Abandon ~ ^ Suspend ^ Operation Shutdown ^ Perforate tg'~QgiQ~>~~Oti~. COrCI(f1tSSt01t
^ After Casing ^ Repair Well ^ Plug Perforations ^ Stimulate ^ Re-Enter 058Q9Nell
^ Change Approved Program ^ Pull Tubing ^ Perforate New Pool ^ Waiver ^ Other
2. Operator Name: 4. Current Well Class: 5. Permit To Drill Number
BP Exploration (Alaska) Inc. ®Development ~ ^ Exploratory 197-129
3. Address: ^ Service ^ Stratigraphic 6. API Number:
P.O. Box 196612, Anchorage, Alaska 99519-6612 50.029-21770-01-00
7. If perforating, closest approach in pool(s) opened by this operation to nearest 8. Well Name and Number:
property line where ownership or landownership changes: PBU 07-28A -
Spacing Exception Required? ^ Yes ®No
9. Property Designation: r 10. KB Elevation (ft): 11. Field /Pool(s):
ADL 028309 & 028306 53.25' ~ Prudhoe Bay Field / Prudhoe Bay Oil Pool
12. PRESENT WELL CONDITION SUM MARY
Total Depth MD (ft): Total Depth TVD (ft): Effective Depth MD (ft): Effective Depth TVD (ft): Plugs (measured): Junk (measured):
14392' ~ 8991' 14300' 8990' None None
in e t Size MD TVD r C II
r ral
on r 11 0" 11 1 14 47
Surf 32 1' 13-3/ " 32 1' 3450 1 0
Intermediate 9 9-5/8" 999 ' 804 ' 70 4760
Po n
Liner 714' 7" 9847' - 1 1' 7932' - 79' 7240 5410
Liner 3 72' 4-1 /2" 10419' - 14391' 31 ' - 89 1' 84 0 7 0
Perforation Depth MD (ft): Perforation Depth TVD (ft): Tubing Size: Tubing Grade: Tubing MD (ft):
11955' - 14290' 9007' - 8990' 4-1/2", 12.6# L-80 10401'
Packers and SSSV Type: 7" x 4-1 /2" Baker 'SB-3' packer; Packers and SSSV MD (ft): 10346 ;
2-7/8" Straddle Assembly 10392' - 12410'
13. Attachments: 14. Well Class after proposed work:
® Description Summary of Proposal ^ BOP Sketch
^ Exploratory ®Development ^ Service
^ Detailed Operations Program
15. Estimated Date for 16. Well Status after proposed work:
Commencin O erations: March 20, 2009 ^ Oil ^ Gas ^ Plugged ®Abandoned
17. Verbal Approval: Date:
^ WAG ^ GINJ ^ WINJ ^ WDSPL
Commission Representative:
18. I hereby certify that the foregoing is true and correct to the best of my knowledge. Contact Charles Reynolds, 564-5480
Printed Name John c le Title Engineering Team Leader
Prepared By Name/Number.
Signature Phone 564-4711 Date 3 t7 Terrie Hubble, 564-4628
Commission Use Onl
Sundry Number: • ~(,~ ~/
Conditions of approval: Notify Commission so that a representative may witness I
^ Plug Integrity ,BOP Test ^ Mechanical Integrity Test ^ Location Clearance
Other: 3~ ~~~~~. ~'~ ~ Ps`t ~ti~~ ~`-~~~~~.w~~t~.itc~.~ ~`-~~
Subsequent Form Required: ~,,,`
APPROVED BY ~ ~Z
A roved B : COMMISSIONER THE COMMISSION Date
Form 10-403 Red~06/2006 l Submit In Duplicate
•
To: Tom Maunder
Petroleum Engineer
Alaska Oil & Gas Conservation Commission
From: Charles Reynolds
CTD Engineer
Date: March 11, 2009
Re: 07-286 Sundry Approval
CC: Well File
Sondra Stewman/Terrie Hubble
by
Sundry approval is requested to abandon the existing 07-28A and 07-28AL1 completions.
The parent well 07-28A was rotary sidetracked in Aug 1997 to Zone 1 A. Over half of the perfs were shot
in poor quality sands or the Kavik shale. Production began at solution GOR and slowly rose until cycling
began a year and a half later. It was a good cycle well with 40% on time.
The lateral leg, 07-28AL1, was coil sidetracked from well 07-28A in Aug 2002. The lateral leg was drilled
with an open junction (<10') in Zone 1A at -12400' MD and completed with slotted liner. The perfs in the
parent well, 07-28A, up hole of this junction were shot in/near the Kavik shale and would not produce.
These perfs were tested after the whipstock was set prior to drilling the lateral leg in July 2002, and the.
well would not flow even when nitrogen lifted. 07-28AL1 was completed with a 2-7/8" straddle with a
slickline-run toggle plug allowing flow from the parent, lateral, or commingled flow. At the time of drilling,
the parent well was cycling with a moderate GOR. The commingled new leg increased the oil rate and
significantly decreased the GOR.
The toggle plug was first run in March 2003 when the GOR increased above the marginal level and
allowed only the lateral to produce. Production was toggled between the. parent and lateral to keep rates
under marginal GOR for a couple years. During that time several modifications were made to the toggle
due to difficulties pulling/running, but a videolog in Oct 2004 confirmed the liner top was not damaged.
From Jan 2005 to Jan 2007, the toggle only flowed the lateral leg until the well was shut-in for high GOR
(low oil rate).
The toggle was switched to the parent on Feb 2007 with disappointing results after more than 2 years of
shut-in time. The well cycled until the toggle switched production back to the lateral in Dec 2007. The oil
rate fell rapidly and hit marginal GOR within 2 weeks. Finally, the toggle was pulled in March 2008
allowing commingled flow. The well is now producing above marginal GOR with minimal healing.
During CTD screening in March/April 2008 the well received passing MIT-IA, .MIT-OA, PPPOT-T &
PPPOT-IC. A caliper indicated the tubing was in good-to-poor condition with a maximum wall penetration
of 53%. The CTD screening was redone in Feb 2009 and a caliper was run into the 2-7/8" straddle in
anticipation of a cut and pull. The liner is in good condition.
REASON FOR SIDETRACK:
Both completions, 07-28A and 07-28AL1, produce well above the marginal GOR. Sidetracking from this well will
enable production of Zone 1 A reserves from within another portion of the reservoir that would otherwise remain
at risk. It will also allow for a future sidetrack from the newly drilled lateral to recover other remaining reserves.
Co HC,,,, , b(r t/~,GAC i kl/
r
~ ~l'J /~AIfC/~ ~PCOve ~ >~M
OF Tl~~ ~'e~q~.
~~ ~~~~
Pre-Rig Work: (Scheduled to ben March 20, 2009) •
1. MIT-OA
2. .Drift well for jet cutter to 11,950'
3. Jet cut 2-7/8" straddle liner at 11,930'
4. Catch and Confirm 2-7/8" straddle liner is free
5. Set BPV
6. PT MV, SV, WV
7. Blind and bleed lines, remove well house, level pad
Rig P&A and Sidetrack Operations: (Scheduled to begin on May 27, 2009 using Nordic rig 1)
1. MIRU Nordic Rig 1
2. NU 7-1/16" CT Drilling BOPE and test.
3. Pull BPV i
4. Pull 2-7/8" straddle Liner ~ Y~'S Oi~P~~~
5. Drift for 4-1/2" monobore whipstock and packer assembly
6. Set 4-1/2" Baker monobore whipstock and packer at 11,895'
7. Mill out XN nipple at 10,379'
9. Drill turn and lateral section to 13,630'.
10. Run and cement a 3-3/16" x 2-7/8" L-80 liner string to 11,500'. (This will abandon the existing perforations)
11. Make a cleanout run with mill, motor
12. Log well with SWS MGR-MCNL logging tool.
13. Perforate well
14. FP well to 2000' with McOH.
15. Set BPV. ND 7-1/16" stack. FP tree and PT tree cap to 3500 psi.
16. RDMO Nordic 1.
Post-Rig Work:
1. Re-install wellhouse and FL's.
2. Pull BPV.
3. Run gas lift design.
4. POP Well
TREE = FMC GEN 4
WELLHEAD = FMC •
ACTUATOR = AXELSON
KB. ELEV = 53.25'
BF. ELEV
KOP (A) = 1488' 20" CONDUCTOR, 110'
Max Angle = 95° @ 13278' g1.5#, H-40,
Datum MD = 11559'
~~. ID = 19.124"
Datum TV D = 8800' SS
13-318" CSG, 68#, K-55 (1 JOINT), ID = 12.415" $0'
13-3/8" CSG, 72#, L-80, ID = 12.347" 3292'
Minimum ID = 2.350" @ 12313'
2-7/8" XO JOINT
TOP OF 7" LNR
0 7 2 8A L 1 NOTES: ORIgNAL WELLBORE NOT
OWN BELOW IBP.
4-112" CAMCO SSSV NIP, ID = 3.813"
GAS LIFT MANDRELS
ST MD TVD DEV TYPE VLV LATCH PORT DATE
1 3840 3413 39 MMG DMY RK 0 04/01/08
2 7408 6099 42 MMG DMY RK 0 04/01 /08
3 9743 7850 38 MMG DMY RK 0 04!01/08
9847' ~ 9-5/8" x 8-1 /4" BKR ZXP PKR, ID = 7.500"
9$61' 8.313" BKR HMC HGR, ID = 6.250"
9867' -{8.313" X 7" XO, ID = 6.184"
1034 7" X 4-112" BKR SB-3 PKR, ID = 3.875"
10379' ~-~ 4-112" HES XN NIP, ID = 3.725"
3.0"TIW PBR, ID = 2.377" ~-j 10392
4-1/2" TBG, 12.6#, L-80, .0152 bpf, ID = 3.958" 10401'
3" X 2-7/8" XO, ID = 2.372" 10402'
9-518" CSG, 47#, L-80, ID = 8.681" 10564'
7" LNR, 26#, L-80„ .0383 bpf, ID = 6.276" ~--~ 10561'
2-718" LNR, 6.16#, L-80, .0055 bpf, ID = 2.372" ~ 12410'
PERFORATION SUMMARY
REF LOG: BHCS ON 02/10/88
ANGLE AT TOP PERF: @ '
Note: Refer to Production DB for historical perf data
SIZE SPF INTERVAL Opn/Sqz DATE
SEE PAGE 2 FOR PERF DATA
07
10395' 7" X 5-3/4" BKR ZXP PKR
w / 7.11" TIEBACK, ID = 4.40"
10401' 4-1/2" WLEG, ID = 3.958"
ELMD TT NOT LOGGED
10408' 7" X 5" HMC HGR, ID = 4.40"
10415' 5" X 4-1 /2" XO, ID = 3.937"
11936' -12313' ~~ 2-7/8" SOLID BLAST JOINT, CSH
12345' -12405' 2-7/8" SOLID BLAST JOINT, CSH
12413' 3.60" BKR DEPLOY SUB, ID = 3.00"
12416' 3-1 /2" X 2-7/8" XO PIN, ID = 2.377"
___ _______ L1 (ZA1)LEMWNVDOW45°
L1 (ZA1) ___ _ _ _~ 12397 --12403
.OPENING WIDTH =3.715"
4-1.12" X 2-778" TM/ KS ANCHOR , ID = 2.371"
DATE REV BY COMMENTS DATE REV BY COMMENTS
06/20/88 ROWAN 41 ORIGINAL COMPLETION 05/08!08 OB/MCZ/PJ DRAWING CORRECTIONS
08/19/97 D141 SIDETRACK (07-28A) 02/16/09 KDC/SV PULL TOGGLE PLUG (03130/08)
07/31/02 NORDIC 1 CTD SIDETRACK (07-28AL1)
12/19/07 JCM/PJC TOGGLE PLUG (12/14/07)
04/06/08 JCM/SV GLV CIO
04/07/08 PJC DRAWING CORRECTIONS
PRUDHOE BAY UNIT
WELL: 07-28AL1
PERMIT No: 1971290 (2021060)
API No: 50-029-21770-01 (60)
SEC 33, T11N, R14E, 394' FNL & 339' FEL
BP Exploration (Alaska)
• 07-28AL1 •
PERFORATION SUMMARY
REF LOG: BRCS ON 02/10/88
ANGLE AT TOP PERF: @'
Note: Refer to Production DB for historical pert data
SIZE SPF ZONE INTERVAL Opn/Sqz DATE
2-3/4" 4 ZA1 11955 - 12006 O 08/17/97
2-3/4" 4 12124 - 12193 O 08/17/97
2-3/4" 4 12240 - 12294 O 08/17/97
2-3/4" 4 12537 - 12592 O 08/17/97
2-3l4" 4 12710 - 12752 O 08/17/97
2-3/4" 4 12854 - 12947 O 08/17/97
2-3l4" 4 13024 - 13113 O 08/17/97
2-3/4" 4 13163 - 13210 O 08/17/97
2-3/4" 4 13404 - 13680 0 08!17/97
214" 4 13720 - 13920 O 08!17/97
2-3/4" 4 13960 - 14290 O 08/17/97
2-7/8" PRE-DRILL ZA1 12418 - 12482 O 07/28/02
2-7l8" 12501 - 13070 O 07/28/02
2-7l8" 13090 - 13691 O 07/28/02
12413' - 13725' 3-3/4" L1 (ZA1)
2-7/8" LNR, 6.16#, L-80, .0058 bpf, ID - 2.441"
--- L1~ -----~
PBTD 14300'
10392' - 12410' 6-3/4" 07-28A (ZONE?)
4-1/2" LNR, 12.6#, L-80, .0152 bpf, ID = 3.958" 14391'
DATE REV BY COMMENTS DATE REV BY COMMENTS
06!20188 ROWAN 41 ORIGINAL COMPLETION 05/08/08 OB/MCZ/PJ DRAWING CORRECTIONS
08/19/97 D141 SIDETRACK 07-28A 02/16/09 KDC/SV PULL TOGGLE PLUG (03(30/08)
07/31/02 NORDIC 1 CTD SIDETRACK (07-28AL1)
12/19!07 JCMlPJC TOGGLE PLUG (12/14/07)
04!06!08 JCM/SV GLV C/O
04/07/08 PJC DRAWING CORRECTIONS
PRUDHOE BAY UNIT
WELL: 07-28AL1
PERMIT No: 1971290 (2021060)
API No: 50-029-21770-01 (60)
SEC 33, T11 N, R14E, 394' FNL & 339' FEL
BP Exploration (Alaska)
7 ~~ 8 B ~AFETY MOTES: ORIGINAL WELLBORE NOT
NOWN BELOW IBP.
Proposed CTD Sidetrack
20" CONDUCTOR, 110' ''
91.5>«, FI.40,
ID =19.124"
13.318" CSG, 88*, Ik55 (1 JO~IT), ID = 12.415"
.13-3r8" CSG, 72*, L•80, O= 12.347" 32~J2'
Minimum I[) = 2.30" ~ 11,509'
Milled out SELRT bushin
TOP Of 7" LNR 9847'
IO-518" CSG. 47*, L-80, ID = 8.681" mill out w indo~n~ ~--{ 10023'
O
14112" CAMCO SSSV NIP, ID = 3.813" I
PERFORATION SUMMARY
REF LOG EHCS OrJ 02M 01'8S
APJ~= L~ ~ • T.=~F F'ESF i~t, '
Note: Refer to Produc3ion DB for historical f data
SIZE SPF ZONE INTERVAL OpnlSgx DATE
4112" TBG, 12.6*, L-80, .0152 bpf, ID = 3.958" ~-{ 10401
7" LNR, 261r, L-80...0383 Dpf, O = 6.276" 10561'
TOPS-12"X3-3/18"X2-71'3"LNR ~ 11~D'
5~
4112" mo
11955'-12294' HPERFs
12-718" LNR, 6.16*, L-80, .0055 bDf, O = 2.372" I
41R" LNR, 12.6rM, L-80, .0152 bpf, ID = 3.958"
T MD TVD DEV TYPE VLV LATCH PORT DATE
1 3840 3413 39 MMG DMY RK 0 04101A8
7408 6099 42 MMG DMY RK 0 04/01AD8
9847 ~-19-518" x 8.114' BKR ZXP PKR, D = 7.5D0"
9861' 8.313" BKR HMC HGR, ID =6.250"
9867' 8.313" X 7" XO, ID = 6.184'
10346' 1-17" X41J2" BKR SB•3 PKR, ID = 3.875"
10379' 4112" HES XN NIP, ID milled to = 3.80"
10395' 7" X 5-314" BKR ZXP PKR
w/ 7.11" TIEBACK, ID = 4.40"
10401' 4112" wLEG, ID = 3.958"
ELMD TT NOT LAGGED
10408' 7" X 5" HMC HGR, ID = 4.40"
10415' S" X 4117 XO, ID = 3.937"
TSGR 10565'
(Milled out bushing ~ = 2.30" I
3-3116" X2-718" cmt'ed and perfed
x2-7/8J4 over
~ 111936'-12313' i~2-718" SOLID BLAST JOINT, CSH
------- ~L1----~
12407' 41 f2" x: 2-718" TIW KS ANCHOR , IU = 2.379"
DATE REY BY CC~+IENTS DATE REV BY COMMENTS PRUDHOE BAY UNIT
0/120/80 ROWAN 41 ORK~iMAL COMPLETION 05108/08 OBJMCZIPJ DRAWNG CORRECTIONS WELL: 07-28D
08MlA7 D141 SIDETRACK 07-28A 02M 6109 KDC/SV PULL TOGGLE PLUG 03130!08 PERMIT No:
•7137162 NORDIC 7 CTD SIDETRACK (07-28AL1 03103109 MSE PROPOSED CTD S~ETRACK API No: 50-029-21770-02
12/19107 JCMJPJC TOGGLE PLUG (12M 4107) SEC 33 711 N R14E 394' FNL 8 335 FEL
04106/08 JCM/SV GL'V CIO
04/07108 PJC DR,4V11NG CORRECTIONS BP Exploration (Alaska)
THE MATERIAL UNDER THIS COVER HAS BEEN
MICROFILMED
ON OR BEFORE
JANUARY 03 2001
M
E
PL W
ATE IA L U N D ER
TH IS M ARK ER
C:LORIXMFILM.DOC
AOGCC Geological Materials Inventory
PERMIT 97-129 ARCO
Log Data Sent Recieved
7795 ~.,ffCHLUM PEX-AIT/BHC 9/2/97 9/5/97
8110 /~'ERRY GR/SLD 9/26/97 9/26/97
BHC/SL ~j~68-12050 9/2/97 9/5/97
MWD SRVY ~~Y 9988-14392 9/29/97 10/1/97
NGP-MD /1'~033-14392 9/26/97 9/26/97
NGP-TVD b,,ff672-8991 9/26/97 9/26/97
NGP/SLD-MD bi,fi033-14392 9/26/97 9/26/97
NGP/SLD-TVD t~72-8991 9/26/97 9/26/97
PEX-AIT ~M'0568-12090 9/2/97 9/5/97
PEX-CN M'(~68-12078 9/2/97 9/5/97
PEX-CN/LDT /~(f568-12078 9/2/97 9/5/97
PEX-MCFL o,r'6568-12078 9/2/97 9/5/97
PEX-S STVD t~568-12090 9/2/97 9/5/97
'~-407 Completion Date
Are dry ditch samples required? yes
Was the well cored? yes ~ no
Are tests required?
Well is in compliance
Comments
~ no
yes
And received? ~y~g no
Analysis description recieved? --- ~yes ._ _ no
Received? ---
Box
Tuesday, August 31, 1999 Page I of I
STATE OF ALASKA
ALASKA OIL AND GAS CONSERVATION COMMISSION
WELL COMPLETION OR RECOMPLETION REPORT AND LOG
1. Status of Well Classification of Service Well
[~ Oil [] Gas [] Suspended [] Abandoned [] Service
2. Name of Operator 7. Permit Number
ARCO Alaska Inc. 97-129
3. Address 8. APl Number
P.O. Box 196612, Anchorage, Alaska 99519-66 ~.1¢. ....... : ~--..-? 50-029-21770-01
· ~ Ii[ _
4. Location of well at surface ; '" '' :' ": ":; ~ ,~~ 9. Unit or Lease Name
394' SNL, 339' WEL, SEC. 33, TllN, R14E, UM ; J~/ii' ¢~_q.~_i ~.~ PruOhoe Bay Un,t
At top of productive interval i ........ 10. Well Number
At total depth ~. ~-':: ............ ¥:?~;.~: , . :..r - 11. Field and Pool
844' NSL, 4380' WEL, SEC. 21, T11 N, R14E, UM Prudhoe Bay Field / Prudhoe Bay
5. Elevation in feet (indicate KB, DF, etc.) 16. Lease Designation and Serial No. Pool
KBE = 53.25'I ADL 028306
12. Date Spudded7/30/97 113' Date T'D' Reached I 14' Date C°mp" Susp" °r Aband'l15' Water depth' if °ffsh°re 16' N°' °f C°mpleti°ns8/13/97 8/19/97 N/A MSL One
17. Total Depth (MD+TVD)I18. Plug Back Depth (MD+TVD) 119. Directional Survey 120. Depth where SSSV set 121. Thickness of Permafrost
14392 8992 FTI 14300 8991 FTI [~Yes I-]No (Nipple) 2173' MD 1900' (Approx.)
22. Type Electric or Other Logs Run
MWD/LWD, GR RES, CNL, DEN, Sonic
23. CASING, LINER AND CEMENTING RECORD
CASING SE-FrING DEPTH HOLE
SIZE WT. PER FT. GRADE TOP BOTTOM SIZE CEMENTING RECORD AMOUNT PULLED
20" 91.5# H-40 Surface 110' 30" 2538 # Poleset
13-3/8" 68# / 72# K-55 / L-80 Surface 3291' 17-1/2" 3ooo sx cs ~l~, 6oo sx 'G'; Top Job 200 sx CS I
9-5/8" 47# L-80 Surface 9993' 12-1/4" 875 sx Class 'G', 400 sx CS I
7" 26# L-80 9847' 10561' 8-1/2" 170 sx Class 'G'
4-1/2" 12.6# L-80 10419' 14391' 6" 401 sx Class 'G'
24. Perforations open to Production (MD+TVD of Top and 25. TUBING RECORD
Bottom and interval, size and number) SIZE DEPTH SET (MD) PACKER SET (MD)
2-3/4" Gun Diameter, 4 spf 2-3/4" Gun Diameter, 4 spf 4-1/2", 12.6#, L-80 10401' 10346'
MD TVD MD TVD
11955' - 12006' 9007' - 9011' 13404' - 13680' 8992' - 8982'
12124' - 12193' 9002' - 8999' 13720' - 13920' 8983' - 8982' 26. ACID, FRACTURE, CEMENT SQUEEZE, ETC.
12240' - 12294' 8998' - 8995' 13960' - 14290' 8983' - 8990' DEPTH INTERVAL (MD) AMOUNT & KIND OF MATERIAL USED
12537' - 12592' 8990' -8988' Freeze Protect with 180 Bbls of Diesel
12710' - 12752' 8986' - 8986'
12854' - 12947' 8991' - 8994'
13024' - 13113' 8997' - 8999'
13163' - 13210' 8999' - 8998'
27. PRODUCTION TEST
Date First Production I Method of Operation (Flowing, gas lift, etc.)
August 23, 1997 I Gas Lift
Date of Test Hours Tested PRODUCTION FOR OIL-DEL GAS-MCF WATER-DEL CHOKE SIZE IGAs-OIL RATIO
TEST PERIOD
I
Flow Tubing Casing Pressure OALCULATED OIL-DEL GAS-MCF WATER-DEL OIL GRAVITY-APl (CORR)
Press. 124-HOUR RATE
28. CORE DATA
Brief description of lithology, porosity, fractures, apparent dips and pre§ence of oil, gas or water.~
' " ~.
·
0RICINAL
Form 10-407 Rev. 07-01-80 Submit In Duplicate
29. Geologic Markers 30. Formation Tests
Measured True Vertical Include interval tested, pressure data, all fluids
Marker Name Depth Depth recovered and gravity, GOR, and time of each phase.
I Sag River 10557' 8377'
Sh ublik 10636' 8412'
Top of Sadlerochit 10770' 8471'
Zone 3 11112' 8621'
Zone 2C 11272' 8700'
Zone 2B 11332' 8734'
Zone 1 B 11760' 8950'
31. List of Attachments
Summary of Daily Drilling Reports, Surveys
32. I hereby certi~ that the foregoing is, C_.. rue and correct to the best of my knowledge
Signed Jame~_..~..~.~ ~ ¢~f//'"~t~ Title Senior Drilling Engineer, Acting Date
..-' ¢' '
0¢-28A 97-129 Prepared By Name/Number: Terrie Hubble, 564-4628
Well Number Permit No. / Approval No.
INSTRUCTIONS
GENERAL: This form is designed for submitting a complete and correct well completion report and log on all types of lands and
leases in Alaska.
iTEM 1'- Classification of Service Wells: Gas injection, water injection, steam injection, air injection, salt water disposal, water
supply for injection, observation, injection for in-situ combustion.
iTEM 5: Indicate which elevation is used as reference (where not otherwise shown) for depth measurements given in other spaces
on this form and in any attachments.
iTEM 16 AND 24: If this well is completed for separate production from more than one interval (multiple completion), so state in item
16, and in item 24 show the producing intervals for only the interval reported in item 27. Submit a separate form for each additional
interval to be separately produced, showing the data pertinent to such interval.
ITEM 21.' Indicate whether from ground level (GL) or other elevation (DF, KB, etc.).
ITEM 23: Attached supplemental records for this well should show the details of any multiple stage cementing and the location of
the cementing tool.
ITEM 2?.' Method of Operation: Flowing, Gas Lift, Rod Pump, Hydraulic Pump, Submersible, Water Injection, Gas Injection, Shut-In,
Other-explain.
ITEM 28: If no cores taken, indicate 'none'.
Form 10-407 Rev. 07-01-80
Facility
PB DS 07
Progress Report
Well 07-28A
Rig Doyon 141
Page
Date
1
24 October 97
Date/Time
24 Jul 97
25 Jul 97
26 Jul 97
27 Jul 97
28 Jul 97
29 Jul 97
30 Jul 97
14:00-17:00
17:00-22:00
22:00-00:00
00:00-00:30
00:30-03:00
03:00-06:00
06:00-12:00
12:00-12:30
12:30-16:00
16:00-18:00
18:00-19:00
19:00-21:30
21:30-00:00
00:00-00:30
00:30-02:00
02:00-03:00
03:00-04:00
04:00-06:00
06:00-12:00
12:00-12:30
12:30-14:30
14:30-18:00
18:00-20:30
20:30-00:00
00:00-00:30
00:30-03:00
03:00-06:00
06:00-12:00
12:00-12:30
12:30-14:00
14:00-14:30
14:30-17:00
17:00-18:00
18:00-22:30
22:30-00:00
00:00-00:30
00:30-06:00
06:00-12:00
12:00-12:30
12:30-19:30
19:30-22:30
22:30-00:00
00:00-00:30
00:30-06:00
06:00-12:00
12:00-12:30
12:30-14:30
14:30-15:00
15:00-18:00
18:00-19:30
19:30-20:30
20:30-00:00
00:00-00:30
00:30-01:30
Duration
1/2 hr
2-1/2 hr
3hr
6hr
1/2 hr
3-1/2 hr
2hr
lhr
2-1/2 hr
2-1/2 hr
1/2 hr
1-1/2 hr
lhr
lhr
2hr
6hr
1/2 hr
2hr
3-1/2 hr
2-1/2 hr
3-1/2 hr
1/2 hr
2-1/2 hr
3hr
6hr
1/2 hr
1-1/2 hr
1/2 hr
2-1/2 hr
lhr
4-1/2 hr
1-1/2 hr
1/2 hr
5-1/2 hr
6hr
1/2 hr
7hr
3hr
1-1/2 hr
1/2 hr
5-1/2 hr
6hr
1/2 hr
2hr
1/2 hr
3hr
1-1/2 hr
lhr
3-1/2 hr
1/2 hr
lhr
Activity
Rigged down Fluid system
Rigged down Drillfloor / Derrick
Removed Drillfloor / Derrick
Held safety meeting
Rig moved 98.00 %
Rigged up Drillfloor / Derrick
Rigged up Drillfloor / Derrick
Held safety meeting
Installed Additional services
Rigged up High pressure lines
Held safety meeting
Removed Xmas tree
Circulated at 10330.00 ft
Held safety meeting
Circulated at 10330.00 ft
Monitor wellbore pressures
Removed Xmas tree
Installed BOP stack
Rigged up BOP stack
Held safety meeting
Rigged up Bell nipple
Tested BOP stack
Retrieved Accessories
Laid down 1500.00 ft of Tubing
Held safety meeting
Laid down 700.00 ft of Tubing
Laid down 1800.00 ft of Tubing
Laid down 9300.00 ft of Tubing
Held safety meeting
Laid down 713.00 ft of Tubing
Held safety meeting
Conducted electric cable operations
Tested Casing
Rigged up Bell nipple
Tested BOP stack
Held safety meeting
Ran Drillpipe to 1500.00 ft (5in OD)
Ran Drillpipe to 5239.00 ft (5in OD)
Held safety meeting
Ran Drillpipe to 9990.00 ft (5in OD)
Circulated at 10000.00 ft
Worked toolstring at 9993.00 ft
Held safety meeting
Worked toolstring at 10000.00 ft
Worked toolstring at 10005.00 ft
Held safety meeting
Worked toolstring at 10031.00 ft
Worked toolstring at 10031.00 ft
Circulated at 10031.00 ft
Pulled out of hole to 8500.00 ft
Serviced Block line
Pulled out of hole to 0.00 ft
Held safety meeting
Flow check
Progress Report
Facility PB DS 07
Well 07-28A
Rig Doyon 141
Page 2
Date 24 October 97
Date/Time
01:30-05:00
05:00-06:00
06:00-09:30
09:30-12:00
12:00-12:30
12:30-00:00
31 Jul 97 00:00-00:30
00:30-06:00
06:00-11:00
11:00-12:30
12:30-13:30
13:30-15:00
15:00-20:30
20:30-00:00
01 Aug 97 00:00-00:30
00:30-03:30
03:30-06:00
06:00-08:00
08:00-09:30
09:30-10:30
10:30-12:30
12:30-14:00
14:00-15:00
15:00-21:00
21:00-00:00
02 Aug 97 00:00-00:30
00:30-06:00
06:00-06:30
06:30-09:30
09:30-12:00
12:00-12:30
12:30-13:00
13:00-15:30
15:30-18:30
18:30-19:00
19:00-20:00
20:00-22:30
22:30-23:00
23:00-00:00
03 Aug 97 00:00-00:30
00:30-01:00
01:00-05:00
05:00-06:00
06:00-12:00
12:00-12:30
12:30-00:00
04 Aug 97 00:00-00:30
00:30-06:00
06:00-08:00
08:00-10:00
10:00-12:00
12:00-12:30
12:30-16:00
16:00-17:30
Duration
3-1/2 hr
lhr
3-1/2 hr
2-1/2 hr
1/2 hr
11-1/2 hr
1/2 hr
5-1/2 hr
5hr
1-1/2 hr
lhr
1-1/2 hr
5-1/2 hr
3-1/2 hr
1/2 hr
3hr
2-1/2 hr
2hr
1-1/2 hr
lhr
2hr
1-1/2 hr
lhr
6hr
3hr
1/2 hr
5-1/2 hr
1/2hr
3hr
2-1/2 hr
1/2 hr
1/2hr
2-1/2 hr
3hr
1/2 hr
lhr
2-1/2 hr
1/2 hr
lhr
1/2 hr
1/2 hr
4hr
lhr
6hr
1/2 hr
11-1/2 hr
1/2hr
5-1/2 hr
2hr
2hr
2hr
1/2hr
3-1/2 hr
1-1/2 hr
Activity
Made up BHA no. 1
R.I.H. to 10031.00 ft
R.I.H. to 10031.00 ft
Drilled to 10072.00 ft
Held safety meeting
Drilled to 10355.00 ft
Held safety meeting
Drilled to 10443.00 ft
Drilled to 10561.00 ft
Circulated at 10561.00 ft
Pulled out of hole to 10000.00 ft
Circulated at 10561.00 ft
Pulled out of hole to 1553.00 ft
Pulled BHA
Held safety meeting
Ran Liner to 735.00 ft (7in OD)
Ran Drillpipe to 9826.00 ft (5in OD)
Ran Liner to 10000.00 ft (7in OD)
Circulated at 10000.00 ft
Ran Liner to 10561.00 ft (7in OD)
Mixed and pumped slurry - 35.000 bbl
Reverse circulated at 9847.00 ft
Circulated at 9847.00 ft
Laid down 4030.00 ft of Drillpipe
Pulled Drillpipe in stands to 0.00 ft
Held safety meeting
Tested BOP stack
Installed Wear bushing
Made up BHA no. 2
R.I.H. to 2480.00 ft
Held safety meeting
Serviced Drillstring handling equipment
R.I.H. to 4557.00 fi
R.I.H. to 9847.00 ft
R.I.H. to 10380.00 ft
Drilled cement to 10479.00 ft
Drilled installed equipment - Landing collar
Tested Liner - Via string
Drilled cement to 10546.00 ft
Held safety meeting
Drilled to 10575.00 fi
Circulated at 10575.00 ft
Drilled to 10575.00 ft
Drilled to 10730.00 fi
Held safety meeting
Drilled to 11120.00 ft
Held safety meeting
Drilled to 11284.00 ft
Drilled to 11368.00 ft
Circulated at 11368.00 ft
Pulled out of hole to 9500.00 ft
Held safety meeting
Pulled out of hole to 200.00 ft
Pulled BHA
Progress Report
Facility PB DS 07
Well 07-28A
Rig Doyon 141
Page 3
Date 24 October 97
Date/Time
17:30-19:00
19:00-20:00
20:00-00:00
05 Aug 97 00:00-00:30
00:30-01:30
01:30-03:30
03:30-06:00
06:00-12:00
12:00-12:30
12:30-16:30
16:30-18:30
18:30-00:00
06 Aug 97 00:00-00:30
00:30-01:00
01:00-02:00
02:00-03:30
03:30-06:00
06:00-09:30
09:30-12:00
12:00-12:30
12:30-00:00
07 Aug 97 00:00-00:30
00:30-06:00
06:00-10:30
10:30-12:00
12:00-12:30
12:30-13:00
13:00-20:00
20:00-22:00
22:00-00:00
08 Aug 97 00:00-00:30
00:30-06:00
06:00-12:00
12:00-12:30
12:30-15:30
15:30-20:00
20:00-21:00
21:00-00:00
09 Aug 97 00:00-00:30
00:30-02:00
02:00-06:00
06:00-06:30
06:30-07:30
07:30-09:00
09:00-12:00
12:00-12:30
12:30-00:00
10 Aug 97 00:00-00:30
00:30-06:00
06:00-12:00
12:00-12:30
12:30-22:00
22:00-00:00
11 Aug 97 00:00-00:30
Duration
1-1/2 hr
lhr
4hr
1/2 hr
lhr
2hr
2-1/2 hr
6hr
1/2 hr
4hr
2hr
5-1/2 hr
1/2 hr
1/2 hr
lhr
1-1/2 hr
2-1/2 hr
3-1/2 hr
2-1/2 hr
1/2 hr
11-1/2 hr
1/2hr
5-1/2 hr
4-1/2 hr
1-1/2 hr
1/2hr
1/2hr
7hr
2hr
2hr
1/2 hr
5-1/2 hr
6hr
1/2hr
3hr
4-1/2 hr
lhr
3hr
1/2 hr
1-1/2 hr
4hr
1/2 hr
lhr
1-1/2 hr
3hr
1/2 hr
11-1/2 hr
1/2 hr
5-1/2 hr
6hr
1/2hr
9-1/2 hr
2hr
1/2 hr
Activity
Made up BHA no. 3
R.I.H. to 1500.00 fi
R.I.H. to 7500.00 ft
Held safety meeting
Serviced Block line
R.I.H. to 11368.00 ft
Drilled to 11401.00 ft
Drilled to 11602.00 ft
Held safety meeting
Drilled to 11679.00 ft
Circulated at 11679.00 ft
Pulled out of hole to 2000.00 ft
Held safety meeting
Pulled out of hole to 200.00 ft
Pulled BHA
Made up BHA no. 4
R.I.H. to 5125.00 ft
R.I.H. to 11679.00 ft (cont...)
Drilled to 11726.00 ft
Held safety meeting
Drilled to 11977.00 ft
Held safety meeting
Drilled to 12039.00 ft
Drilled to 12103.00 ft (cont...)
Circulated at 12103.00 ft
Held safety meeting
Circulated at 12103.00 ft
Pulled out of hole to 100.00 ft
Pulled BHA
Ran logs on tubulars
Held safety meeting
Ran logs on tubulars
Ran logs on tubulars (cont...)
Held safety meeting
Ran logs on tubulars
Pulled out of hole to 106.00 ft
Retrieved Other sub-surface equipment
Tested BOP stack
Held safety meeting
Made up BHA no. 5
R.I.H. to 6740.00 ft
R.I.H. to 8000.00 ft (cont...)
Serviced Block line
R.I.H. to 12103.00 ft
Drilled to 12172.00 ft
Held safety meeting
Drilled to 12484.00 ft
Held safety meeting
Drilled to 12700.00 ft
Drilled to 12946.00 ft (cont...)
Held safety meeting
Drilled to 13241.00 ft
Circulated at 13241.00 ft
Held safety meeting
Progress Report
Facility PB DS 07
Well 07-28A
Rig Doyon 141
Page 4
Date 24 October 97
Date/Time
00:30-04:45
04:45-05:00
05:00-06:00
06:00-07:30
07:30-08:30
08:30-10:00
10:00-12:00
12:00-12:30
12:30-16:30
16:30-00:00
12 Aug 97 00:00-00:30
00:30-06:00
06:00-12:00
12:00-12:30
12:30-00:00
13 Aug 97 00:00-00:30
00:30-06:00
06:00-12:00
12:00-12:30
12:30-14:00
14:00-16:00
16:00-17:00
17:00-18:00
18:00-20:30
20:30-00:00
14 Aug 97 00:00-00:30
00:30-02:30
02:30-06:00
06:00-06:30
06:30-07:30
07:30-08:30
08:30-12:00
12:00-12:30
12:30-15:00
15:00-16:00
16:00-21:30
21:30-22:00
22:00-23:00
23:00-00:00
15 Aug 97 00:00-00:30
00:30-06:00
06:00-06:15
06:15-07:00
07:00-07:45
07:45-08:15
08:15-08:35
08:35-09:30
09:30-12:00
12:00-12:30
12:30-14:30
14:30-17:00
17:00-21:00
21:00-00:00
16 Aug 97 00:00-00:30
Duration
4-1/4 hr
1/4 hr
lhr
1-1/2 hr
lhr
1-1/2 hr
2hr
1/2 hr
4hr
7-1/2 hr
1/2 hr
5-1/2 hr
6hr
1/2hr
11-1/2 hr
1/2 hr
5-1/2 hr
6hr
1/2 hr
1-1/2 hr
2hr
lhr
lhr
2-1/2 hr
3-1/2 hr
1/2 hr
2hr
3-1/2 hr
1/2 hr
lhr
lhr
3-1/2 hr
1/2 hr
2-1/2 hr
lhr
5-1/2 hr
1/2hr
lhr
lhr
1/2 hr
5-1/2 hr
1/4 hr
3/4 hr
3/4 hr
1/2 hr
1/4 hr
3/4 hr
2-1/2 hr
1/2 hr
2hr
2-1/2 hr
4hr
3hr
1/2 hr
Activity
Pulled out of hole to 4860.00 ft
Rigged up Drillstring handling equipment
Pulled out of hole to 2747.00 ft
Pulled out of hole to 197.00 ft (cont...)
Pulled BHA
Made up BHA no. 6
R.I.H. to 3756.00 ft
Held safety meeting
R.I.H. to 13241.00 ft
Drilled to 13328.00 ft
Held safety meeting
Drilled to 13378.00 ft
Drilled to 13378.00 ft (cont...)
Held safety meeting
Drilled to 13949.00 ft
Held safety meeting
Drilled to 14139.00 ft
Drilled to 14335.00 ft (cont...)
Held safety meeting
Drilled to 14392.00 ft
Circulated at 14392.00 ft
Pulled out of hole to 13190.00 ft
R.I.H. to 14392.00 ft
Circulated at 14392.00 ft
Pulled out of hole to 8692.00 ft
Held safety meeting
Pulled out of hole to 4865.00 ft
Laid down 3807.00 ft of 3-1/2in OD drill pipe
Laid down 852.00 ft of 3-1/2in OD drill pipe (cont...)
Pulled BHA
Rigged up Casing handling equipment
Ran Liner to 2152.00 ft (4-1/2in OD)
Held safety meeting
Ran Liner to 3977.00 ft (4-1/2in OD)
Rigged up Handling equipment
Ran Drillpipe to 3870.00 ft (2-7/8in OD)
Installed Liner hanger
Circulated at 3997.00 ft
Ran Liner on landing string to 4980.00 ft
Held safety meeting
Ran Liner on landing string to 14392.00 ft
Ran Liner on landing string to 14392.00 ft (cont...)
Circulated at 14392.00 ft
Batch mixed slurry - 88.000 bbl
Pumped Fresh water spacers - volume 70.000 bbl
Mixed and pumped slurry - 85.000 bbl
Displaced slurry - 188.000 bbl
Circulated at 10395.00 ft
Held safety meeting
Serviced Block line
Circulated at 10394.00 ft
Pulled Drillpipe in stands to 10384.00 ft
Laid down 2084.00 ft of 2-7/8in OD drill pipe
Held safety meeting
Facility
Date/Time
17 Aug 97
18 Aug 97
19 Aug 97
PB DS 07
Progress Report
Well 07-28A Page
Rig Doyon 141 Date
00:30-01:30
01:30-04:30
04:30-05:00
05:00-06:00
06:00-11:30
11:30-12:00
12:00-12:30
12:30-17:30
17:30-18:00
18:00-18:30
18:30-19:30
19:30-23:30
23:30-00:00
00:00-00:30
00:30-06:00
06:00-07:30
07:30-08:30
08:30-17:00
17:00-18:30
18:30-19:00
19:00-00:00
00:00-00:30
00:30-06:00
06:00-09:30
09:30-14:00
14:00-15:00
15:00-16:00
16:00-18:00
18:00-22:30
22:30-23:30
23:30-02:30
02:30-04:30
Duration
lhr
3hr
1/2 hr
lhr
5-1/2 hr
1/2 hr
1/2 hr
5hr
1/2 hr
1/2 hr
lhr
4hr
1/2 hr
1/2 hr
5-1/2 hr
1-1/2 hr
lhr
8-1/2 hr
1-1/2 hr
1/2 hr
5hr
1/2hr
5-1/2 hr
3-1/2 hr
4-1/2 hr
lhr
lhr
2hr
4-1/2 hr
lhr
3hr
2hr
Activity
Pulled Drillpipe in stands to 0.00 ft
Tested BOP stack
Tested Liner
Space out tubulars
Space out tubulars (cont...)
Ran Drillpipe in stands to 5921.00 ft
Held safety meeting
Ran Drillpipe in stands to 14299.00 ft
Held safety meeting
Perforated
Reverse circulated at 10254.00 ft
Packer worked at 10254.00 ft
Laid down 400.00 ft of 5in OD drill pipe
Held safety meeting
Laid down 8869.00 ft of 5in OD drill pipe
Laid down 963.00 ft of 3-1/2in OD drill pipe
Retrieved Retrievable packer
Laid down 1678.00 ft of 2-7/8in OD drill pipe
Tested Top ram
Rigged up Tubing handling equipment
Ran Tubing to 3113.00 ft (4-1/2in OD)
Held safety meeting
Ran Tubing to 405in (9935.00 ft OD)
Ran Tubing to 10402.00 ft (4-1/2in OD) (cont...)
Reverse circulated at 10400.00 ft
Set packer at 10349.00 ft with 4000.0 psi
Installed Hanger plug
Rigged down BOP stack
Installed Xmas tree
Tested Casing
Freeze protect well - 180.000 bbl of Diesel
Installed Hanger plug
5
24 October 97
ARCO ALASKA, INC.
PBU / 7-28A
500292177001
NORTH SLOPE BOROUGH
COMPUTATION DATE: 10/21/97
ANCHORAGE ALASKA . /~0
DATE OF SURVEY: 081397
MWD SURVEY
JOB NI/MBER: AK-MW-70220
KELLY BUSHING ELEV. = 53.25 FT.
OPERATOR: ARCO ALASKA INC
TRUE SUB-SEA
MEASD VERTICAL VERTICAL
DEPTH DEPTH DEPTH
COURS COURSE DLS TOTAL
INCLN DIRECTION RECTANGULAR COORDINATES VERT.
DG MN DEGREES DG/100 NORTH/SOUTH EAST/WEST SECT.
9988.00 8039.25 7986.00
9993.80 8043.57 7990.32
10005.00 8051.90 7998.65
10009.57 8055.29 8002.04
10041.34 8078.72 8025.47
41 54 N 7.40 W .00 4915.60N 2177.40W 4904.23
41 55 N 5.73 W 19.23 4919.45N 2177.84W 4907.13
41 55 N 5.73 W .00 4926.89N 2178.59W 4912.66
42 11 N 4.10 W 24.61 4929.94N 2178.85W 4914.89
42 47 N .88 W 7.11 4951.38N 2179.78W 4929.90
10073.17 8101.89 8048.64
10109.04 8127.69 8074.44
10133.89 8145.09 8091.84
10170.76 8169.72 8116.47
10196.14 8185.74 8132.49
43 47 N 3.32 E 9.57 4973.19N 2179.31W 4944.13
44 16 N 7.80 E 8.78 4997.99N 2176.89W 4958.89
46 47 N 10.75 E 13.24 5015.48N 2174.02W 4968.45
49 24 N 14.89 E 10.93 5042.22N 2167.92W 4981.77
52 17 N 17.60 E 14.11 5061.11N 2162.40W 4990.29
10228.53 8205.09 8151.84
10259.12 8223.08 8169.83
10290.26 8241.51 8188.26
10324.00 8261.28 8208.03
10355.03 8279.15 8225.90
54 24 N 23.90 E 16.89 5085.38N 2153.19W 4999.65
53 35 N 29.70 E 15.56 5107.46N 2142.04W 5006.10
53 54 N 36.70 E 18.15 5128.45N 2128.30W 5009.90
54 24 N 42.40 E 13.77 5149.52N 2110.90W 5011.03
55 17 N 46.10 E 10.17 5167.69N 2093.20W 5009.99
10386.91 8296.68 8243.43
10417.48 8312.62 8259.37
10447.70 8327.56 8274.31
10479.03 8342.13 8288.88
10503.50 8353.26 8300.01
58 0 N 49.70 E 12.68 5185.52N 2073.44W 5007.21
59 9 N 52.70 E 9.18 5201.86N 2053.11W 5003.00
61 34 N 55.70 E 11.79 5217.22N 2031.80W 4997.40
62 59 N 57.90 E 7.67 5232.40N 2008.60W 4990.28
62 54 N 58.40 E 1.85 5243.90N 1990.09W 4984.19
10542.63 8370.99 8317.74
10576.16 8385.95 8332.70
10606.96 8399.53 8346.28
10637.81 8413.07 8359.82
10669.13 8426.80 8373.55
63 12 N 58.50 E .78 5262.15N 1960.36W 4974.26
63 47 N 58.61 E 1.81 5277.80N 1934.76W 4965.67
63 54 N 58.70 E .42 5292.18N 1911.15W 4957.71
64 0 N 58.80 E .43 5306.56N 1887.45W 4949.69
64 0 N 59.00 E .58 5321.10N 1863.35W 4941.47
10700.35 8440.44 8387.19
10731.96 8454.22 8400.97
10763.50 8467.97 8414.72
10791.75 8480.34 8427.09
10826.30 8495.40 8442.15
64 11 N 59.60 E 1.84 5335.44N 1839.20W 4933.08
64 5 N 59.50 E .43 534~.86N 1814.68W 4924.46
64 11 N 58.60 E 2.59 5364.45N 1790.34W 4916.10
63 54 N 57.60 E 3.36 5377.88N 1768.77W 4909.02
64 24 N 55.00 E 6.93 5395.12N 1742.91W 4901.30
10856.40 8508.41 8455.16
10889.50 8522.71 8469.46
10921.32 8536.46 8483.21
10952.70 8550.02 8496.77
10980.70 8562.09 8508.84
64 24 N 55.20 E .60 5410.66N 1720.65W 4895.12
64 24 N 55.10 E .27 5427.71N 1696.15W 4888.28
64 24 N 55.50 E 1.13 5444.05N 1672.56W 4881.64
64 24 N 55.50 E .00 5460.08N 1649.24W 4875.00
64 30 N 55.90 E 1.34 5474.31N 1628.37W 4868.98
ORIGINAL
REGE ¥P-u
t40V 5 1997
Gas Cons. Ca;qrd~.n
.t-,,nchc:rage
SPF--~Y-SUN DRILLING SERVICES
ANCHORAGE ALASKA
PAGE
ARCO ALASKA, INC.
PBU'/ 7-28A
500292177001
NORTH SLOPE BOROUGH
COMPUTATION DATE: 10/21/97
DATE OF SURVEY: 081397
MWD SURVEY
JOB NUMBER: AK-MW-70220
KELLY BUSHING ELEV. = 53.25 FT.
OPERATOR: ARCO ALASKA INC
TRUE SUB-SEA
MEASD VERTICAL VERTICAL
DEPTH DEPTH DEPTH
COURS
INCLN
DG MN
COURSE DLS TOTAL
DIRECTION RECTANGULAR COORDINATES
DEGREES DG/100 NORTH/SOUTH EAST/WEST
VERT.
SECT.
11015.86 8577.34 8524.09 64 5
11047.39 8591.46 8538.21 62 42
11080.01 8606.29 8553.04 63 12
11111.58 8620.58 8567.33 63 0
11143.98 8635.29 8582.04 63 0
N 54.80 E 3.04 5492.33N 1602.31W
N 51.50 E 10.36 5509.23N 1579.75W
N 49.50 E 5.67 5527.70N 1557.34W
N 46.30 E 9.06 5546.57N 1536.45W
N 43.90 E 6.60 5566.95N 1516.01W
4861.62
4856.13
4851.80
4848.86
4847.26
11174.88 8649.68 8596.43 61 30
11204.12 8664.01 8610.76 59 47
11235.58 8680.33 8627.08 57 42
11267.32 8697.59 8644.34 56 24
11299.27 8715.42 8662.17 55 47
N 40.00 E 12.18
N 38.10 E 8.12
N 36.90 E 7.43
N 34.80 E 6.90
N 29.10 E 14.92
5587.27N 1497.73W
5607.06N 1481.67W
5628.39N 1465.30W
5649.97N 1449.70W
5672.46N 1435.67W
4847.24
4848.51
4850.58
4853.39
4857.98
11322.24 8728.35 8675.10 55 42
11353.95 8746.11 8692.86 56 12
11385.86 8763.64 8710.39 57 12
11417.12 8780.47 8727.22 57 42
11448.22 8796.73 8743.48 59 17
N 27.20 E 6.85
N 22.20 E 13.16
N 15.90 E 16.79
N 9.20 E 18.13
N 3.90 E 15.41
5689.20N 1426.72W
5713.05N 1415.75W
5738.25N 1407.06W
5763.94N 1401.34W
5790.27N 1398.33W
4862.50
4870.27
4880.64
4893.56
4908.90
11477.86 8811.94 8758.69 59 0
11508.45 8827.70 8774.45 59 0
11538.13 8843.06 8789.81 58 42
11568.69 8858.72 8805.47 59 42
11602.11 8875.89 8822.64 58 30
N 1.50 W 15.67
N 6.70 W 14.57
N 12.60 W 17.04
N 17.80 W 14.98
N 21.20 W 9.44
5815.70N 1397.79W
5841.84N 1399.67W
5866.86N 1403.92W
5892.18N 1410.81W
5919.21N 1420.37W
4925.49
4944.35
4964.23
4986.27
5011.44
11633.51 8892.44 8839.19 57 54
11665.44 8909.15 8855.90 59 0
11691.96 8921.98 8868.73 63 5
11724.05 8935.81 8882.56 65 54
11755.56 8948.13 8894.88 68 5
N 24.70 W 9.66
N 28.40 W 10.46
N 31.10 W 17.84
N 37.80 W 20.76
N 42.20 W 14.63
5943.78N 1430.77W
5968.11N 1442.93W
5988.24N 1454.46W
6012.10N 1470.84W
6034.30N 1489.49W
5035.60
5060.90
5082.93
5111.06
5139.76
11788.60 8959.90 8906.65
11817.47 8969.66 8916.41
11847.17 8979.41 8926.16
11877.69 8989.11 8935.86
11908.70 8998.26 8945.01
70 11 N 48.40 W 18.65
70 18 N 54.70 W 20.54
71 24 N 60.50 W 18.81
71 35 N 67.50 W 21.76
74 5 N 73.20 W 19.32
6056.00N 1511.43W
607~.88N 1532.69W
6087.90N 1556.37W
6100.58N 1582.37W
6110.53N 1610.26W
5170.58
5197.69
5225.34
5253.16
5280.56
11943.79 9006.12 8952.87
11975.51 9009.98 8956.73
12006.63 9010.80 8957.55
12038.23 9009.22 8955.97
12076.44 9006.09 8952.84
80 0
86 0
91 0
94 41
94 41
N 75.70 W 18.19
N 77.00 W 19.35
N 80.50 W 19.61
N 82.50 W 13.31
N 81.20 W 3.39
6119.68N 1643.19W
6127.11N 1673.77W
6133.17N 1704.27W
6137.84N 1735.48W
6143.24N 1773.17W
5311.18
5338.89
5365.64
5391.97
5423.63
SPF~--Y-SUN DRILLING SERVICES
ANCHORAGE ALASKA
PAGE
ARCO ALASKA, INC.
PBU / 7-28A
500292177001
NORTH SLOPE BOROUGH
COMPUTATION DATE: 10/21/97
DATE OF SURVEY: 081397
MWD SURVEY
JOB NIZ~BER: AK-MW-70220
KELLY BUSHING ELEV. = 53.25 FT.
OPERATOR: ARCO ALASKA INC
TRUE SUB-SEA
MEASD VERTICAL VERTICAL
DEPTH DEPTH DEPTH
COURS
INCLN
DG MN
COURSE DLS TOTAL
DIRECTION RECTANGULAR COORDINATES
DEGREES DG/100 NORTH/SOUTH EAST/WEST
VERT.
SECT.
12108.48 9003.44 8950.19
12139.61 9000.86 8947.61
12169.70 8999.21 8945.96
12201.05 8998.80 8945.55
12237.13 8998.20 8944.95
94 48 N 81.00 W .70 6148.18N 1804.72W
94 41 N 80.80 W .72 6153.08N 1835.35W
91 35 N 81.50 W 10.56 6157.71N 1865.03W
89 54 N 82.70 W 6.64 6162.01N 1896.07W
92 0 N 83.40 W 6.14 6166.38N 1931.88W
5450.40
5476.47
5501.64
5527.62
5557.18
12263.63 8996.91 8943.66
12295.32 8994.92 8941.67
12326.98 8992.98 8939.73
12357.03 8991.25 8938.00
12388.54 8990.24 8936.99
93 35 N 83.70 W 6.14 6169.35N 1958.18W
93 35 N 83.50 W .63 6172.88N 1989.61W
93 24 N 83.30 W .89 6176.51N 2021.00W
93 11 N 83.60 W 1.20 6179.93N 2050.80W
90 30 N 84.80 W 9.38 6183.11N 2082.13W
5578.73
5604.47
5630.26
5654.72
5680.16
12420.03 8990.43 8937.18
12456.84 8991.17 8937.92
12489.36 8991.08 8937.83
12518.56 8990.37 8937.12
12548.76 8989.53 8936.28
88 48 N 85.10 W 5.48 6185.88N 2113.50W
88 54 N 84.80 W .86 6189.12N 2150.15W
91 24 N 84.70 W 7.69 6192.10N 2182.53W
91 24 N 84.50 W .68 6194.84N 2211.59W
91 48 N 84.00 W 2.12 6197.87N 2241.63W
5705.35
5734.79
5760.87
5784.33
5808.70
12579.97 8988.57 8935.32
12609.81 8987.71 8934.46
12642.32 8986.78 8933.53
12672.55 8986.09 8932.84
12702.50 8985.86 8932.61
91 41 N 84.20 W .72 6201.08N 2272.66W
91 35 N 84.20 W .34 6204.09N 2302.33W
91 41 N 83.80 W 1.27 6207.49N 2334.65W
90 54 N 83.80 W 2.65 6210.75N 2364.70W
90 0 N 83.70 W 3.02 6214.01N 2394.47W
5833.93
5858.02
5884.34
5908.87
5933.20
12731.32 8985.86 8932.61
12763.00 8986.19 8932.94
12793.07 8987.16 8933.91
12827.11 8989.03 8935.78
12856.77 8990.89 8937.64
90 0 N 83.60 W .34 6217.20N 2423.11W
88 48 N 83.80 W 3.84 6220.67N 2454.59W
87 30 N 84.50 W 4.91 6223.74N 2484.49W
86 11 N 85.00 W 4.09 6226.85N 2518.33W
86 35 N 85.00 W 1.35 6229.43N 2547.82W
5956.65
5982.40
6006.69
6033.95
6057.61
12888.40 8992.33 8939.08
12914.49 8993.19 8939.94
12943.86. 8994.01 8940.76
12974.91 8994.77 8941.52
13007.29 8996.21 8942.96
88 11 N 84.00 W 5.96 6232.46N 2579.27W
88 0 N 83.80 W 1.09 6235.23N 2605.20W
88 48 N 82.40 W 5.49 6238.75N 2634.34W
88 24 N 82.20 W 1.44 6242.91N 2665.10W
86 30 N 82.20 W 5.87 6247.30N 2697.15W
6083.04
6104.18
6128.22
6153.89
6180.66
13039.83 8997.86 8944.61
13069.79 8998.80 8945.55
13101.18 8999.32 8946.07
13131.87 8999.53 8946.28
13163.28 8999.07 8945.82
87 41 N 83.20 W 4.80 6251.43N 2729.38W
88 41 N 84.10 W 4.49 6254.74N 2759.14W
89 24 N 84.20 W 2.25 6257.94N 2790.36W
89 48 N 84.00 W 1.46 6261.10N 2820.89W
91 54 N 83.80 W 6.72 6264.43N 2852.11W
6207.40
6231.76
6257.13
6281.95
6307.41
SPF'~-Y-SUN DRILLING SERVICES
ANCHORAGE ALASKA
PAGE
ARCO ALASKA, INC.
PBU / 7-28A
500292177001
NORTH SLOPE BOROUGH
COMPUTATION DATE: 10/21/97
DATE OF SURVEY: 081397
MWD SURVEY
JOB NUMBER: AK-MW-70220
KELLY BUSHING ELEV. = 53.25 FT.
OPERATOR: ARCO ALASKA INC
TRUE SUB-SEA
MEASD VERTICAL VERTICAL
DEPTH DEPTH DEPTH
COURS
INCLN
DG MN
COURSE DLS TOTAL
DIRECTION RECTANGULAR COORDINATES
DEGREES DG/100 NORTH/SOUTH EAST/WEST
VERT.
SECT.
13201.42 8997.84 8944.59
13225.99 8997.49 8944.24
13257.50 8997.80 8944.55
13293.30 8998.23 8944.98
13324.79 8997.90 8944.65
91 48
89 48
89 5
89 30
91 41
N 84.80 W 2.63 6268.22N 2890.04W
N 84.60 W 8.18 6270.49N 2914.50W
N 84.70 W 2.24 6273.43N 2945.87W
N 85.80 W 3.27 6276.39N 2981.54W
N 87.00 W 7.96 6278.37N 3012.96W
6338.16
6357.88
6383.18
6411.71
6436.41
13355.99 8996.35 8943.10
13380.02 8994.38 8941.13
13411.07 8991.17 8937.92
13443.15 8987.90 8934.65
13474.08 8985.31 8932.06
94 0
95 24
96 30
95 11
94 24
N 87.60 W 7.62 6279.83N 3044.08W
N 87.50 W 5.84 6280.86N 3068.00W
N 86.50 W 4.78 6282.47N 3098.84W
N 85.20 W 5.72 6284.78N 3130.67W
N 85.20 W 2.59 6287.36N 3161.38W
6460.54
6479.03
6503.06
6528.28
6552.85
13510.91 8982.67 8929.42
13538.94 8981.48 8928.23
13569.51 8981.00 8927.75
13600.82 8980.78 8927.53
13632.28 8980.89 8927.64
93 48
91 5
90 41
9O 5
89 30
N 84.40 W 2.71 6290.69N 3197.96W
N 85.80 W 10.85 6293.08N 3225.86W
N 84.20 W 5.39 6295.75N 3256.31W
N 85.30 W 4.00 6298.61N 3287.49W
N 84.50 W 3.18 6301.41N 3318.82W
6582.30
6604.66
6629.09
6654.20
6679.38
13666.71 8981.43 8928.18
13699.25 8982.31 8929.06
13730.38 8983.39 8930.14
13762.00 8983.95 8930.70
13792.97 8983.86 8930.61
88
88
87
90
90
41
11
48
11
5
N 83.20 W 4.43 6305.10N 3353.04W
N 83.90 W 2.64 6308.75N 3385.37W
N 83.50 W 1.82 6312.16N 3416.29W
N 85.20 W 9.30 6315.28N 3447.75W
N 85.20 W .33 6317.87N 3478.61W
6707.31
6733.81
6759.09
6784.58
6809.27
13823.33 8983.84 8930.59
13854.06 8983.52 8930.27
13885.68 8982.77 8929.52
13917.10 8982.33 8929.08
13948.76 8982.42 8929.17
9O 0
91 11
91 30
9O 5
89 35
N 82.20 W 9.89 6321.20N 3508.78W
N 78.30 W 13.28 6326.40N 3539.06W
N 73.30 W 15.84 6334.15N 3569.69W
N 70.10 W 11.12 6344.02N 3599.52W
N 69.60 W 2.23 6354.92N 3629.24W
6833.95
6859.96
6887.93
6916.71
6946.11
13980.45 8983.22 8929.97
14012.15 8984.54 8931.29
14043.15 8985.90 8932.65
14072.79 8987.32 8934.07
14104.59 8988.93 8935.68
87 30
87 41
87 18
87 11
87 0
N 68.70 W 7.21 6366.19N 3658.84W
N 68.30 W 1.41 6377.80N 3688.31W
N 68.20 W 1.33 6389.28N 3717.07W
N 69.40 W 4.06 6399.98N 3744.67W
N 68.30 W 3.51 6411.44N 3774.29W
6975.67
7005.35
7034.42
7062.11
7091.81
14136.21 8989.81 8936.56
14166.24 8989.91 8936.66
14196.30 8989.99 8936.74
14229.06 8990.11 8936.86
14257.86 8990.26 8937.01
89 48
89 48
89 54
89 41
89 41
N 68.90 W 9.06 6422.97N 3803.72W
N 68.90 W .07 6433.79N 3831.73W
N 68.00 W 3.01 6444.83N 3859.69W
N 67.50 W 1.64 6457.23N 3890.01W
N 67.30 W .69 6468.30N 3916.60W
7121.40
7149.47
7177.65
7208.50
7235.68
SPF~--~Y-SUN DRILLING SERVICES
ANCHORAGE ALASKA
PAGE 5
ARCO ALASKA, INC.
PBU / 7-28A
500292177001
NORTH SLOPE BOROUGH
COMPUTATION DATE: 10/21/97
DATE OF SURVEY: 081397
MWD SURVEY
JOB NUMBER: AK-MW-70220
KELLY BUSHING ELEV. = 53.25 FT.
OPERATOR: ARCO ALASKA INC
TRUE SUB-SEA COURS COURSE DLS TOTAL
MEASD VERTICAL VERTICAL INCLN DIRECTION RECTANGULAR COORDINATES VERT.
DEPTH DEPTH DEPTH DG MN DEGREES DG/100 NORTH/SOUTH EAST/WEST SECT.
14287.73 8990.41 8937.16 89 41 N 67.90 W 2.01
14329.75 8990.85 8937.60 89 5 N 68.30 W 1.72
14392.00 8991.83 8938.58 89 5 N 68.30 W .03
6479.68N 3944.22W 7263.83
6495.35N 3983.20W 7303.31
6518.37N 4041.03W 7361.71
THE CALCULATION PROCEDURES ARE BASED ON THE USE OF
THREE-DIMENSION MINIMUM CURVATURE METHOD.
HORIZONTAL DISPLACEMENT = 7669.36 FEET
AT NORTH 31 DEG. 47 MIN. WEST AT MD = 14392
VERTICAL SECTION RELATIVE TO WELL HEAD
VERTICAL SECTION COMPUTED ALONG 311.92 DEG.
TIE-IN SURVEY AT 9,988.00' MD
WINDOW POINT AT 10,005.00' MD
PROJECTED SURVEY AT 14,392.00' MD
SPF'~Y-SUN DRILLING SERVICES
ANCHORAGE ALASKA
PAGE
ARCO ALASKA, INC.
PBU / 7-28A
500292177001
NORTH SLOPE BOROUGH
COMPUTATION DATE: 10/21/97
DATE OF SURVEY: 081397
JOB 5KIMBER: AK-MW-70220
KELLY BUSHING ELEV. = 53.25 FT.
OPERATOR: ARCO ALASKA INC
INTERPOLATED VALUES FOR EVEN 1000 FEET OF MEASURED DEPTH
TRUE SUB-SEA
MEASD VERTICAL VERTICAL
DEPTH DEPTH DEPTH
TOTAL
RECTANGULAR COORDINATES
NORTH/SOUTH EAST/WEST
MD-TVD VERTICAL
DIFFERENCE CORRECTION
9988.00 8039.25 7986.00 4915.60 N 2177.40 W
10988.00 8565.23 8511.98 5478.01 N 1622.91 W
11988.00 9010.63 8957.38 6129.76 N 1685.96 W
12988.00 8995.14 8941.89 6244.69 N 2678.06 W
13988.00 8983.55 8930.30 6368.93 N 3665.87 W
1948.75
2422.77 474.02
2977.37 554.60
3992.86 1015.50
5004.45 1011.59
14392.00 8991.83 8938.58 6518.37 N 4041.03 W
5400.17 395.71
THE CALCULATION PROCEDURES ARE BASED ON THE USE OF
THREE-DIMENSION MINIMUM CURVATURE METHOD.
SP~--AY-SUN DRILLING SERVICES
ANCHORAGE ALASKA
PAGE
ARCO ALASKA, INC.
PBU / 7-28A
500292177001
NORTH SLOPE BOROUGH
COMPUTATION DATE: 10/21/97
DATE OF SURVEY: 081397
JOB NUMBER: AK-MW-70220
KELLY BUSHING ELEV. = 53.25 FT.
OPERATOR: ARCO ALASKA INC
INTERPOLATED VALUES FOR EVEN 100 FEET OF SUB-SEA DEPTH
TRUE SUB-SEA
MEASD VERTICAL VERTICAL
DEPTH DEPTH DEPTH
TOTAL
RECTANGULAR COORDINATES
NORTH/SOUTH EAST/WEST
MD-TVD VERTICAL
DIFFERENCE CORRECTION
9988.00 8039.25 7986.00 4915.60 N 2177.40 W 1948.75
10006.81 8053.25 8000.00 4928.09 N 2178.73 W 1953.56 4.81
10145.92 8153.25 8100.00 5024.15 N 2172.24 W 1992.67 39.11
10310.26 8253.25 8200.00 5141.10 N 2118.22 W 2057.01 64.33
10503.48 8353.25 8300.00 5243.88 N 1990.10 W 2150.23 93.22
10729.73 8453.25 8400.00 5348.84 N 1816.41 W 2276.48 126.25
10960.19 8553.25 8500.00 5463.90 N 1643.67 W 2406.94 130.46
11182.35 8653.25 8600.00 5592.31 N 1493.52 W 2529.10 122.16
11366.85 8753.25 8700.00 5723.10 N 1411.94 W 2613.60 84.50
11557.96 8853.25 8800.00 5883.31 N 1408.25 W 2704.71 91.11
11769.60 8953.25 8900.00 6043.74 N 1498.52 W 2816.35 111.64
11808.00 8966.46 8913.21 6067.60 N 1525.51 W 2841.54 25.19
THE CALCULATION PROCEDURES USE A LINEAR INTERPOLATION BETWEEN
THE NEAREST 20 FOOT MD (FROM MINIMUM CURVATURE) POINTS
r'~ Ft I I_1_ I I~1 G S E FI~./I I~ E S
October 31, 1997
AOGCC
Lori Taylor
3001 Porcupine Dr
Anchorage, AK 99501
Re: Distribution of Survey Data 7-28A
Dear Ms. Taylor,
The original distributed MWD surveys for this well had an error. The Latitude and Departure
were incorrect. Please destroy the previous data delivered and replace it with this corrected
information.
Please call me at 563-3256 if you have any questions or concerns.
Regards,
William T. Allen
Survey Manager
Attachments.
.
0ii & Gas Cons.
.Anchorage
5631 Silverado Way, Suite G · Anchorage, Alaska 99518 · (907) 563-3256 ° Fax (907) 563-7252
A Dresser Industries, Inc. Company
0 F! I I--/I I~] (3 S IS FIU'I C:: E S
October 27, 1997
AOGCC
Lori Taylor
3001 Porcupine Drive
Anchorage, AK 99501
Re: Distribution of Survey Data 7-28A
Dear Ms. Taylor:
Enclosed are two hard copies of the above mentioned file(s).
Well 7-28A
MWD survey tie-in point at 9,988.00', window point at 10,005.00' and a
projected survey at 14,392.00'.
Please call me at 563-3256 if you have any questions or concerns.
Regards,
William T. Allen
Operations Support Engineer
Attachments
.Alaska Oil & Gas Oons. Comm~s~¢
Anohorage
5631 Silverado Way, Suite G · Anchorage, Alaska 99518 · (907) 563-3256 · Fax (907) 563-7252
A Dresser Industries, Inc. Company
r'l I:t I I_1_ I I~1 G
September 29, 1997
AOGCC
Lori Taylor
3001 Porcupine Drive
Anchorage, AK 99501
Re: Distribution of Survey Data 7-28A
Dear Ms. Taylor:
Enclosed are two hard copies of the above mentioned file(s).
Well 7-28A
MWD survey tie-in point at 9988.00', window point at 10,005.00' and a
projected survey at 14,392.00'.
Please call me at 563-3256 if you have any questions or concerns.
Regards,
William T. Allen
Operations Support Engineer
Attachments
5631 Silverado Way, Suite G · Anchorage, Alaska 99518 · (907) 563-3256 · Fax (907) 563-7252
A Dresser Industries, Inc. Company
C] F! I I_1--1N 13 S I~ FIU~! i-- E S
WELL LOG TRANSMITTAL
To:
State of Alaska
Alaska Oil and Gas Conservation Comm.
Atm.' Loft Taylor
3001 PorcUpine Dr.
Anchorage, Alaska 99501
MWD Formation Evaluation Logs - D.S. 7-28A,
AK-MW-70220
September 26, 1997
The technical data listed below is being submitted herewith. Please acknowledge receipt by returning a
signed copy of this transmittal letter to the attention of.'
Ytm Galvin, Sperry-Sun Drilling Services, 5631 Silverado Way, #G, Anchorage, AK 99518
1 LDWG formatted Disc with verification listing.
Al>I#: 50-029-21770-01.
5631 Silverado Way, Suite G · Anchorage, Alaska 99518 · (9.07) 563.-3256 · Fax (907) 563-7252
A Dresser Industries, Inc. Company
0 I::! I I--I-- I I~1G S G I::! ~./I r' ~::: S
WELL LOG TRANSMITTAL
To-.
State of Alaska
Alaska Oil and Gas Conservation Comm.
Atm.- Loft Taylor
3001 Porcupine Dr.
Anchorage, Alaska 99501
RE: MWD Formation Evaluation Logs D.S. 7-28A, AK-MW-70220
September 26, 1997
The technical data listed below is being submitted herewith. Please address any problems or concerns
to the attention off
Yah Galvin, Sperry-Sun Drilling Services, 5631 Silverado Way, #G, Anchor. age, AK 99518
D.S. 7-28A:
2"x 5"MD Gamma Ray Logs:
50-029-21770-01
2" x 5" TVD Gamma Ray LOgs:
50-029-21770-01
2" x 5" MD Gamma Ray & Density Logs:
50-029-21770-01
2"x 5" TVD Gamma Ray & Density Logs:
50-029-21770-01
1 Blueline
1 Folded Sepia
1 Blueline
1 Folded Sepia
1 Blueline
1 Folded Sepia
1 Blueline
-,
SEP 2 6 1997
~Jaska 0il & Gas C~ns. oomrr~s~..
~d~or~e
5631 Silverado Way, Suite G · Anchorage, AJaska 99518 · (9.07) 563-3256 · Fax (907) 563-7252
A Dresser Industries, Inc. Company
9/2/97
GeoQuest
500 W. International Airport Road
Anchorage, AK 99518-1199
ATTN: Sherrie
NO. 11305
Company:
Alaska Oil & Gas Cons Comm
Attn: Lori Taylor
3001 Porcupine Drive
Anchorage, AK 99501
Field: Prudhoe Bay (Open Hole)
LIS
Well Job # Log Description Date BL RF Sepia Tape
D.S. 7-28A 97369 PEX,AIT & BHC 970808 I 7~IiT79,~-
D.S. 7-28A 97369 PEX-AIT 970808 1 1
D.S. 7-28A 97369 PEX-MCFL 970808 I 1
D.S. 7-28A 97369 PEX-CNL 970808 1 1
D,S. 7-28A 97369 PEX-CNL/LDT 970808 I 1
D.S, 7-28A 97369 IPEX-SS'I'VD 970808 I 1
D.S. 7-28A 97369 BI'lC 970808 1 1
RECEIVED
S£P 0 5 1997
SIGNED: DATE:
Alaska Oil & Gas Cons. Commi~ior~
Anchorage
Please sign and return one copy of this transmittal to Sherrie at the above address. Thank you.
TONY KNOWLES, GOVERNOR
ALASKA OIL AND GAS
CONSERVATION COMMISSION
3001 PORCUPINE DRIVE
ANCHORAGE, ALASKA 99501-3192
PHONE: (907) 279-1433
FAX: (907) 276-7542
July 17, 1997
Paul K. Prince
Senior Drilling Engineer
BP Exploration (Alaska) Inc.
P O Box 196612
Anchorage, AK 99519-6612
Re;
Pmdhoe Bay Unit 07-28A
BP Exploration (Alaska) Inc.
Permit No: 97-129
Sur. Loc. 394'SNL. 339'WEL. Sec. 33, TI 1N, R14E. UM
Btrnhole Loc: 616'NSL. 4042'WEL. Sec. 21, T1 IN. R14E. UM
Dear Mr. Prince:
Enclosed is the approvcd application for permit to rcdrill thc above referenced well.
Thc permit to rcdnll does not excmpt you from obtaining additional permits rcquircd bv law from
other governmental agencies, and does not authorize conducting drilling operations until all other
required permitting determinations arc made.
Blowout prevention equipment (BOPE) must be tested in accordance with 20 AAC 25.035.
Sufficient notice (approximately 24 hours) of thc BOPE test pcrformcd bcforc drilling beloxv the
surface casing shoe must be givcn so that a rcpresentative of the Commission may witness the test.
Notice may be givcn by contacting the Commission petrolcum field inspector on the North Slope
pager at 659-3607.
David W. Jolm! ~n
Chairman
BY ORDER OF THE COMMISSION
dlf/enclosures
cc: Depamncnt of Fish & Game. flabital Section w-o encl.
Department of Envinomment Conservation ~vo encl.
'- STATE OF ALASKA -
ALASKA ,..,L AND GAS CONSERVATION COMMISSION
PERMIT TO DRILL
20 AAC 25.005
la. Type of work [] Drill [] Redrill lb. Type of well [] Exploratory [] Stratigraphic Test [] Development Oil
[] Re-Entry [] Deepen [] Service [] Development Gas [] Single Zone [] Multiple Zone
2. Name of Operator 5. Datum Elevation (DF or KB) 10. Field and Pool
ARCO Alaska Inc. Plan RKB = 53.6' Prudhoe Bay Field / Prudhoe
3. Address 6. Property Designation Bay Pool
P.O. Box 196612, Anchorage, Alaska 99519-6612 ADL 028306
4. Location of well at surface 7. Unit or Property Name 11. Type Bond (See 20 AAC 25.025);
394' SNL, 339' WEL, SEC. 33, T11N, R14E, UM Prudhoe Bay Unit
At top of productive interval 8. Well Number Number U-630610
404' NSL, 2047' WEL, SEC. 21, T11N, R14E, UM 07-28A
At total depth 9. Approximate spud date Amount $200,000.00
616' NSL, 4042' WEL, SEC. 21, T11N, R14E, UM 07/07/97
12. Distance to nearest property linet 13. Distance to nearest well 14. Number of acres in property 15. Proposed depth (MD and TVD)
ADL 028309, 616'I No Close Approach 2560 13993' MD / 8949' TVD
16. To be completed for deviated wells 117. Anticipated pressure {see 20 AAC 25.035 (e)(2)}
Kick Off Depth 9980' Maximum Hole Angle 90° Maximum surface 2470 psig, At total depth (TVD) 8800' / 3350 psig
18. Casing Program Setting Depth
Size Specifications Top Bottom Quantity of Cement
Hole Casing Weight Grade Coupling Length MD TVD MD TVD (include stage data)
8-1/2" 7" 26# L-80 BTC-Mod 734' 9830' 7922' 10564' 8394' 153 sx Class 'G'
6" 4-1/2" 12.6# L-80 IBT-Mod 3579' 10414' 8782' 13993' 9003' 360 sx Class 'G'
19. To be completed for Redrill, Re-entry, and Deepen Operations.
Present well condition summary
Total depth: measured 11405 feet Plugs (measured) PBTD Tagged at 11255' MD (05/26/94) l i!t ~ 0 1997'
true vertical 9151 feet 4lasl,~a Oil & Gas Cons. Cot[ii
Effective depth: measured 11255 feet Junk (measured) Baker CTU packer at 11267' MD
true vertical 9029 feet
Casing Length Size Cemented M D TVD
Structural
Conductor 80' 20" 2538# Poleset 110' 110'
Surface 3252' 13-3/8" 3000 sx cs III, 600 sx 'G', Top Job 200 sx CS I 3291' 2998'
Intermediate
Production 10528' 9-5/8" 875 sx Class 'G', 400 sx CS I 10564' 8475'
Liner 1047' 7" 367 sx Class 'G' 10353' - 11400' 8312' - 9147'
Perforation depth: measured 11191' - 11201', 11207'- 11214', 11223' - 11253';
Sqzd: 10938'-10944', 11160'-11173', 11181'-11191'ORIGINAL
true vertical 8977' - 8985', 8990' - 8996', 9003' - 9027';
Sqzd: 8772' - 8977' (three intervals)
20. Attachments [] Filing Fee [] Property Plat [] BOP Sketch [] Diverter Sketch [] Drilling Program
[] Drilling Fluid Program []Time vs Depth PIct [] Refraction Analysis [] Seabed Report [] 20 AAC 25.050 Requirements
Contact Engineer NamelNumber: JimI ISrr~ 564-5026 it~ Prepared By NamelNumber: Terrie Hubble, 564-4628
21.1Signedhereby certify that the fo r~g,,efng~Vct ~ ~ ~ tr~¢~ alhd//correctj to the best of my knowledge
Pau, K. Prince '~~' ~'-"~"'" Title Senior Drilling Engineer Date, , ~ O~L__
Commission Use Only
Permit Number ] APINumber I ApprovalDate I See cover letter
/o/~../.~ ¢ 50-029-21770-01 '~ --- / '~ --'~'~' for other requirements
Conditions of Approval: Samples Required l-lYes f~]No Mud Log Required []Yes J~ No
Hydrogen Sulfide Measures Ii'Yes []No Directional Survey Required []Yes [] No
Required Working Pressure for BOPE r-12M; ,[~.3M; 1-15M; r-I10M; E]15M
Other:
Original Signea B~
by order of
Approved By David W. Johnston Commissioner the commission Date"~
~is~$ior,
Form 10-401 Rev. 12-01-85 Submit In Triplicate
Well Name:
IDS 7-28A I
Well Plan Summary
I Type of Well (producer or injector): I Producer
Surface Location:
Target Location:
Bottom Hole Location:
394'FNL,339'FEL, Sec. 33, T11N, R14E
X=675841.68, Y=5950523.07
404'FSL, 2047' FEL, Sec.21, T1 IN, R14E
X=673979, Y=5956560
616'FSL, 4042'FEL, Sec. 21, TI IN, R14E
X=671979, Y=5956725
I AFE Number: 14J0360 I
] Estimated Start Date: 17/15/97 ]
MD: 13993'
I Rig: I Doyon #141
I Operating days to complete:
TVDss: 8949'
1 24
I wen Design (conventional, slimhole, etc.):
[Objective: I Sadlerochit- Zone 1
RKB: 53.6'
I sidetrack, horizontal ultra slim hole
Formation Markers:
Formation Tops MD TVD(RKB)
Begin sidetrack 9980 8033 KOP is in Kingak
S ag River 10540 8384
7" liner point 10564 8394 7" at 10'TVD into Sag River
Zone 4A 11049 8591
Zone 3 11135 8630
Zone 2 11269 8699
Zone 1 11653 8917
Start Target 11986 9003 Begin horizontal target
TD & end target 13993 9003 end of 2000' horizontal target polygon
.Oil & Gas L;ons.
Well Plan Summary Page 1
Casing/TU ting Program:
Hole Size Csg/ Wt/Ft Grade Conn Length Top Btm
Tbg O.D. MD/TVD MDfYVD
existing 13-3/8" 72# L-80 BTC 3292' 30'/30' 3292'/2999'
existing 9-5/8" 47# L'80 BTC 10564' 30'/30' 10564'/8475'
existing 7" 29# L-80 BTC 1058' 10342'/8304' 11400'/9147'
8-1/2" 7" 26# L-80 BTCMod 734' 9830'/7922' 10564'/8394'
6" 4-1/2" 12.6# L-80 IBTMod 3579' 10414'/8782' 13993'/9003'
NOTE: original KBE was 65', Orig KBE-BF elevation was 35'.
Logging Program:
I Open Hole Logs:
Cased Hole Logs:
8-1/2" hole, MWD-GR.
6" hole MWD-GR from drillout to TD.
Drill pipe conveyed logs (GR/RES/CNL/DEN/SON) upon reaching
horizontal (near 12,000'MD).
Sample catchers are needed to begin catching drill cutting samples in 6"
hole.
none
Mud Program:
Special design considerations I Whipstock and 8-1/2" hole drilling with LSND, After drillout
I
of 7" dis >lace to Quikdriln for drilling to TD.
8-1/2" hole Mud Properties: 1 9- 5/8" whipstock Kickoff in Kingak
I
Interval
Kickoff
8-1/2" Hole
Density
(PPG)
9.9
10.0
Viscosity
50-75
45-55
Yield Filtrate ph
Point HTHP
25 12 9.5
12-18 12 9.5
Production Mud Properties:l Quikdriln in 6"
Density Viscosity LSR Yield LSRV Filtrate pH
(PPG) Point
8.8 50-65 10-20 45000 NC 8.5-9.0
to
9.0 50-65 10-20 55000 NC 8.5-9.0
Keep Sand content at less than 0.25 % in the production interval
Hazards and Contingencies:
Well Control:
Well control equipment consisting of 5000 psi W.P. pipe rams, blind rams, and annular preventer
will be installed and is capable of handling maximum potential surface pressures.
B OPE and drilling fluid system schematics on file with AOGCC.
Bottom Hole Pressure is 3350 psi at 8800'TVDss (estimated)
Maximum Shut in Casing Pressure at surface is 2470 psi (assumes 0.1 psi/ft gas gradient to
surface)
Well Plan Summary Page 2
Directional:
KOP:
9980'MD, come off whipstock in 8-1/2" hole
and build at 1 l°/100'to liner depth. Drillout in
6" hole, turn/build at 16°/100'to horizontal,
log and hole horizontal to TD
Maximum Hole Angle:
Close Approach Well:
90 in Zone 1 to TD
none
Cement Data:
Casing/Liner
P&A
7" drilling liner
at
10564'MD/TOL at
9830'
4-1/2" liner from
9830'MD to TD at
13993'MD
Lead: Sxs/Wt~ield
none
none
Tail: Sxs/Wt/Yield
100/15.8/1.15
153/15.8/1.15
360/15.7/1.19
Comments
Class "G" bullheaded
down tbg. Calculated
to fill 543' of 7" liner
Class "G" to fill
annulus +30%, 150'
of lap, 150' of DP by
9-5/8" and 80'shoe it.
Class "G"Acid resist.,
30% excess on open
hole plus lap and 150'
above TOL w/3-1/2"
DP in hole.
Name
Contacts
Office
Home
James E. Smith
Paul Prince
David Nims
Robert Morse
Scott Mattison
Toby Archuleta
Drilling Eng.
Drlg. Eng. Supr.
Drilling Supt.
Geologist
Pad Engr.
Geophysics
564-5026
564-5589
564-5219
263-4112
263-4362
265-6389
345-866O
345-6867
346-2026
Sperry Sun (mud plant/rig)
Carl Hoeft/Pete Holtzman
Schlumberger wireline/DP conveyed
Scott Bittner/Graham Struart
659-2809
659-2487
Pager
275-4015
275-7503
275-4539
AIaska Oil & Gas Cons.
Anchorage
Well Plan Summary Page 3
Pre-Rig Operations: Note: original elevation 65' AMSL, OKB to BF - 35'
1. Notify an AOGCC representative prior to beginning P&A operations.
2. Check and service the wellhead, pressure test the 9-5/8" packoffs to 3500 psi Notify Jim Smith at 564-5026 of
results.
3. Kill the well with Seawater.
4. Perform cement P&A of the bottom hole, pumping 20 bbls (100 sacks) of Class G cement at 15.8 ppg to P&A
all bottom perforations from 10938'-1125Y. (NOTE: the top perforations have been squeezed but will cover
with P&A plug anyway) Pump cement followed by displacement to put TOC at 10838'+/-, calculated
displacement is 174.2 bbl.
5. Tag and pressure test the P&A cement plug.
6. Make an explosive cut (Dual End Initiated Severing Tool) of the 4-1/2" 12.6g L-80 tubing at about 10300' at a
collar. The cut is above the 9-5/8" packer at 10329'. (will not fish anything below tubing cut).
7. Pressure test the 9-5/8" casing to 3500 psi.
8. Ensure that the well is dead and then freeze protect to +2000' with diesel. Bleed off all pressure, set BPV in the
tubing hanger and test to 1000 psi against BPV. Secure well.
9. Remove all electrical lines, well house and flow lines. Level the pad and dig out the cellar.
Rig Work:
.
,
.
.
.
.
8.
9.
1
1
1
Oo
.
14.
15.
16.
17.
18.
MIRU, Verify well is dead, confirm packoff status from pre-rig. Pull BPV.
Circulate the well to remove freeze protection and any trapped gas. Set and test TWC to 1000
psi. ND tree, NU and test BOPE.
Pull TWC and circulate well. Pull the 4-1/2" tubing from the cut at approx. 10300'MD. Pull tubing
to remove SSSV, set storm packer and replace 9-5/8" packoffs if pre-rig finds them bad.
Run and set a 9-5/8" EZSV on Baker 20 setting tool (w/CCL). Set the EZSV near 10000'MD at 2'
below a casing collar. (planned KOP is 9980').
Shut in the well and test 9-5/8" and 10-3/4" casing against the EZSV to 3500 psi for 30 minutes.
If the casing leaks, an RTTS run will be made to locate and identify the leaking zone for further
repairs.
PU whipstock assembly for 9-5/8" casing and MWD, RIH on 5" DP to tag the EZSV and set at 30
degrees right of highside.
Mill out of the 9-5/8" casing.
Trip for build and turn assembly, drill per directional plan to 10'MD into Sag River.
Run and cement 7" liner with 150 lap above the whipstock, approximate top of liner 9830' MD.
Drill 6" hole to horizontal along directional plan.
Run DPC logs at horizontal.
Trip for horizontal drilling assy and drill 6" hole to TD (@13973'MD+/-) of the target polygon
interval.
Run and cement 4-1/2" 12.6#, L-80 liner to TD with 150' lap into the 7", approx, top of liner at
10450'MD.
Test liner top packer and liner to 3500 psi for 30 minutes.
Perforate the liner on DP per Asset specifications.
Run 4-1/2" 12.6#, L80 tubing and completion with 3-GLM's.
ND stack, N U tree and test. Set BPV
Secure well, release rig.
Jim Smith
Well Plan Summary Page 4
IShared Services Drilling/
Structure: PB DS 07 Well: 07-28A
Field: Prudhoe Bay Location: Alaska
East ->
Scale 1 ' 200.00
-4000 -3800 -3600 -3400 -3200 -3000 -2800 -2600 -2400 -2200 -2000 -1800 -1600 -1400 -1200 -1000 -800
A
II
C'
o
o
6800
--
6600 -
6400 -
6200
6000
5800
5600
5400
5200
5000
· I . I
13993
11986
I · 6800
I I I I TAR6E~.DA~LA I I I I I
~ Norlh East -- Nome .... PelOton --
9003 6292 -,3716 7-2~ATa¢~'t 2 671979,595672,5
9003 6079 ' -1720 7-28ATtest 1 673979,5956560
In<:
90.0O 276.0,3
90.O0 275.10
6600
7-28A Target 2~~
6400
6200
6000
~ 5800
Z3 Une
5600
5400
~ 7' ~sing
5200
-- -
5000
4600 I I I I ~ I ~ ~ ~ ~' t ~ ~ ~ I ~ ~ I I ~ I I I I t I I I 4600
-4000 -3800 -3600 -3400 -5200 -3000 -2800 -2600 -2400 -2200 -2000 -1800 -1600 -1400 -1200 -1000 -800
A
II
g
O
Scale 1 ' 200.00
East ->
o 7600 -
0
· - 7800 -
~ 8000 -
~ 8200 -
8400 -
0 _
~ 8600 -
~ -
~ 8800 -
I-- -
II 9ooo -
V
9200 -
9400 -
96OO
7-28AWp3 ]
KOP
41.22
44.79
50.12
7' Drilling Liner (est) End of Build
End of Hold/ 65.7,~
f 60.07
Z2C (27P) ~
~, 53.19Z2B (26P) ~,c~,c~
~24P ,~/,~-
Shared Services Drilli
Structure ' PB DS 07
Field ' Prudhoe Bay
Well ' 07-28A
Location'Alaska
WELL PROFILE DATA
.... Point .... MD Inc Dir ~VD North
fie on 9980 41.73 352.26 8033 4909
KOP 10003 40.00 353.00 8050 4924
End of Build 10505 66.07 56.84 8369 5254
End of Hold 11015 66.07 56.84 8576 5489
Target ! 1269 57.00 35.91 8699 5641
rarget 11986 90.00 276.10 9003 6079
fa rget 13993 90.00 276.03 9003 6292
East OLS (deg/lOOft.)
- 2177 0.00
-2178 8.00
-1991 11.00
- 1602 0.00
-1440 8.00
- 172O 16.00
-3716 0.00
4200 4400 4600 4800 5000 5200 5400 5600 5800 6000 6200 6400 6600 6800 7000 7200 7400
Scale 1 ' 200. O0 vedica~ Section on 511.92 azimuth with reference 0.00 $, 0.00 W from 07-28A
7-28A Wp3
Vertical Section 311.92°
RKB 53.6'
MD Inc. Azi.
TVDss
TVDrkb
Rect. Coordinates
Northing
9980.00 41.73 352.26 7979.38 8032.98 4909.43n
10000.00 40.19 352.92 .~ 7994.48 8048.08 4922.43n
10002.51 40.00 353.00 7996.40 8050.00 4924.03n
10100.00 41.78 9.19 8070.30 8123.90 4987.38n
10200.00 45.75 24,05 8142.70 8196.30 5053.18n
10300.00 51.38 36.69 8209.00 8262.60 5117.40n
10400.00 58.15 47,32 8266.77 8320.37 5177.70n
10500.00 65.68 56,42 8313.89 8367.49 5231.86n
10504.89 66.07 56.84 8315.89 8369.49 5234.31n
1'-~539.67 66.07 56.84 8330.00 8383.60 5251.70n
~ 0__564~32 66.07 56.84 8340.00 8393.60 5264.03n
10600.00 66.07 56.84 8354.47 8408.07 5281.86n
10700.00 66.07 56.84 8395.04 8448.64 5331.86n
10800.00 66.07 56.84 8435.61 8489.21 5381.85n
10900.00 66.07 56.84 8476.18 8529.78 5431.85n
11000.00 66.07 56.84 8516.75 8570.35 5481.85n
11013.35 66.07 56.84 8522.17 8575.77 5488.52n
11.048.91 64.62 54.14 8537.00 8590.60 5506.82n
11100.00 62.64 50.15 8559.70 8613.30 5534.89n
11134.72 61.36 47.36 8576.00 8629.60 5555.10n
11200.00 59.12 41.93 8608.42 8662.02 5595.37n
11269.11 57.00 35.91 8645.00 8698.60 5640.94n
11300.00 55.66 3(~.19 8662. i4 8715.74 5662.48n
11395.61 53.32 11.59 8718.00 8771.60 5734.58n
11400.00 53.28 10.71 8720.62 8774.22 5738.03n
11472.57 53.60 356.25 8764.00 8817.60 5795.95n
11500.00 54.17 350.86 8780.17 8833.77 5817.95n
11557.32 56.11 339.93 8813.00 8866.60 5863.34n
11600.00 58.16 332.18 8836.18 8889.78 5896.05n
11611.12 58.77 330.21 8842.00 8895.60 5904.36n~
11653.15 61.33 323.04 8863.00 8916.60 5934.72n
11700.00 64.61 315.47 8884.31 8937.91 5966.28n
11718.41 66.00 312.61 8892.00 8945.60 5977.90n
11800.00 72.73 300.65 8920.82 8974.42 6023.18n
11825.83 75.02 297.06 8928.00 8981.60 6035.15n
11900.00 81.85 287.15 8942.90 8996.50 6062.37n
~11985-63 t 90.00 276.10 8949.00 9002.60 6079.49n
12000.00 90.00 276.10 8949.00 9002.60 6081.02n
12100.00 90.00 276.10 8948.99 9002.59 6091.65n
Easting
2176.52w
2178.21W
2178.41W
2177.04w
2157.06W
2119.00W
2064.27W
1994.87W
1991.14W
1964.52W
1945.66W
1918.36W
1841.85W
1765.33W
1688.81W
1612.29W
1602,08W
1575.45W
1539.31W
1516.26W
1476.44W
1439.61W
1425.59W
1397.87W
1397.19W
1393.69W
1396.18W
1408.05W
1422.61W
1427.18W
1447.22W
1474.46W
1486.48W
1547.69w
1569.42w
1636.64w
1720.11w
1734.40w
1833.84w
Grid Coordinates
Easting
673550.31
673548.31
673548.08
673547.96
673566.38
673602.91
673656.21
673724.31
673727,98
673754.17
673772.74
673799.61
673874.92
673950.23
674025.55
674100.86
674110.91
674137.10
674172.57
674195.14
674233.99
674269.74
674283.25
674309.25
674309.85
674311.99
674308.99
674296.04
674280.72
674275.96
674255.21
674227.24
674214.95
674152.69
674130.68
674062.84
673979.00
673964.68
673865.O3
Northing
5955379.59
5955392.55
5955394.14
5955457.50
5955523.75
5955588.85
5955650.42
5955706.19
5955708.73
5955726.74
5955739.50
5955757.98
5955809.76
5955861.54
5955913.32
5955965.10
5955972.01
5955990.94
5956019.85
5956040.59
5956081.79
5956128.21
5956150.07
5956222.80
5956226.27
5956284.25
5956306.19
5956351.28
5956383.63
5956391.83
5956421.71
5956452.61
5956463.94
5956507.77
5956519.22
5956544.85
5956560.00
5956561.19
5956569.47
DLS
deg/100ft
0.00
8.00
8.00
11.00
11.00
11.00
11.00
11.00
11.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
8.00
8.00
8.00
8.00
8.00
16.00
16.00
16.00
16.00
16.0O
16.00
16.00
16.00
16.00
16.00
16.00
16.00
16.00
16.00
16.00
0.00
0.00
Vertical
Se~ion
4899.46
4909.40
4910.62
4951.92
4981.01
4995.60
4995.16
4979.70
4978.57
4970.38
4964.58
4956.19
4932.65
4909.12
4885.59
4862.05
4858.91
4851.33
4843.19
4839.54
4836.82
4839.85
4843.81
4871.36
4873.16
4909.24
4925.80
4964.96
4997.64
5006.59
5041.79
5083.13
5099.84
5175.65
5199.81
5268.01
5341.56
5353.21
5434.30
Comment
KOP
TSAG (est)
7" Drilling Liner'
-.
Z4A (~,2N)
Z3 (31N)
Z2C (27P)
Z2B (26P)
24P
Z2A (22P)
21P
ZlB (14P)
13P
12P
7-28A Target 1
6/23/97 9:16 AM Page I of 2
7-28A Wp3
Vertical Section
RKB
311.92°
53.6'
MD Inc. Azi.
TVDss
TVDrkb
Rect. Coordinates
Northing.
12200.00 90.00 276.09 8948.99 9002.59 6102.27n
12300.00 90,00 276.09 8948.98 9002.58 6112.88n
12400.00 90.00 276.09 8948.98 9002.58 6123.49n
12500.00 90.00 276.08 8948.98 9002.58 6134.09n
12600.00 90.00 276.08 8948.97 9002.57 6144.68n
12700.00 90.00 276.08 8948.97 9002.57 6155.27n
12800.00 90.00 276.07 8948.97 9002.57 6165.85n
12900.00 90.00 276.07 8948.97 9002.57 6176.43n
13000.00 90.00 276.07 8948.97 9002.57 6187.00n
13100.00 90.00 276.06 8948.97 9002.57 6197.56n
13200.00 90.00 276.06 8948.97 9002.57 6208.12n
13300.00 90.00 276.06 8948.97 9002.57 6218.67n
13400.00 90.00 276.05 8948.97 9002.57 6229.22n
13500.00 90.00 276.05 8948.98 9002.58 6239.76n
13600.00 90.00 276.04 8948.98 9002.58 6250.29n
13700.00 90.00 276.04 8948.98 9002.58 6260.82n
13800.00 90.00 276.04 8948.99 9002.59 6271.34n
13900.00 90.00 276.03 8948.99 9002.59 6281.85n
13992.56 90.00 276.03 8949.00 9002.60 6291.58n
Easting
1933.27w
2032.71w
2132.14w
2231.58w
2331.02w
2430.45w
2529.89w
2629.33w
2728.77w
2828.21w
2927.65w
3027.09w
3126.54w
3225.98w
3325.42w
3424.87w
3524.31w
3623.76w
3715:80w
Grid Coordinates
Easting
673765.38
673665.73
673566.08
673466.42
673366.77
673267.12
673167.46
673067.81
672968.16
672868.50
672768.85
672669.19
672569.53
672469.88
672370.22
672270.56
672170.90
672071.24
671979.00
Northing
5956577.75
5956586.01
5956594.28
5956602.53
5956610.78
5956619.02
5956627.26
5956635.49
5956643.71
5956651.93
5956660.14
5956668.35
5956676.55
5956684.74
5956692.93
5956701.11
5956709.28
5956717.45
5956725.00
DLS
deg/100ft
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
Vertical
Section
5515.38
5596.46
5677.54
5758.61
5839.67
5920.74
6001.80
6082.85
6163.91
6244.96
6326.00
6407.04
6488.08
6569.12
6650.15
6731.17
6812.20
6893.22
6968.20
Comment
7-28A Target 2/TD/4 1/2" Line
6/23/97 9:16 AM Page 2 of 2
STATE OF ALASKA
ALASKA OIL AND GAS CONSERVATION COMMISSION
APPLICATION FOR SUNDRY APPROVAL
1. Type of Request: [] Abandon [] Suspend [] Plugging []Time Extension [] Perforate
[] Alter Casing [] Repair Well [] Pull Tubing [] Vadance [] Other
[] Change Approved Program []Operation Shutdown [] Re-Enter Suspended Well [] Stimulate Plug Back for Sidetrack
2. Name of Operator
ARCO Alaska Inc.
3. Address
P.O. Box 196612, Anchorage, Alaska 99519-6612
5. Type of well:
~3 Development
I--] Exploratory
[--1Stratigraphic
[-IService
4. Location of well at surface
349' SNL, 339' WEL, SEC. 33, T11N, R14E, UM
At top of productive interval
377' SNL, 2517' WEL, SEC. 28, T11N, R14E, UM
At effective depth
82' NSL, 2501' WEL, SEC. 21, T11N, R14E, UM
At total depth
112' NSL, 2500' WEL, SEC. 21, T11N, R14E, UM
6. Datum Elevation (DF or KB)
62' RKB
7. Unit or Property Name
Prudhoe Bay Unit
8. Well Number
07-28
9. Permit Number
88-3
10. APl Number
50-029-21770
11. Field and Pool
Prudhoe Bay Field / Prudhoe Bay
Pool
12. Present well condition summary
Total depth: measured 11405 feet
true vertical 9151 feet
Effective depth: measured 11255 feet
true vertical 9029 feet
Casing Length
Plugs (measured)
Junk (measured)
PBTD Tagged at 11255' MD (05/26/94)
Baker CTU packer at 11267' MD
Size Cemented
Structural
Conductor 80' 20"
Surface 3252' 13-3/8"
Intermediate
Production 10528' 9-5/8"
Liner 1047' 7"
2538# Poleset
3000 sx cs iii, 600 sx 'G'. Top Job 200 sx CS I
875 SX Class 'G', 400 sx CS I
367 sx Class 'G'
MD TVD
110' 110'
3291' 2998'
10564' 8475'
10353'-11400' 8312'-9147'
Perforation depth: measured 11191' - 11201', 11207' - 11214', 11223' - 11253';
Sqzd: 10938'- 10944', 11160'- 11173', 11181'- 11191' ~ i:~ ~~'~ '"'
true vertical 8977' - 8985', 8990' - 8996', 9003' - 9027'; .~ ".-_ .~ '.
Sqzd: 8772' - 8977' (three intervals)
Tubing (size, grade, and measured depth) 4-1/2", 12.6#, L-80 at 10415' '"' ,'. '
Packers and SSSV (type and measured depth)
Otis WD packer at 10329'; Otis HRQ
....
13. Attachments [~ Description summary of proposal I-'1 Detailed operations program [-] BOP sketch
14. Estimated date for commencing operation ~ 15. Status of well classifications as:
July 4, 1997
i16. If proposal was verbally approved [~ Oil [--I Gas [--I Suspended
Name of approver ,-, ..'~', Date approved Service
Contact
Engineer
Name/Number:
Jin~Sr~ith, 564-5~26) Prepared By Name/Number:
17. I hereby certify that the f/br/g~n~/~ ~ru/e' and correct to the best of my knowledge
S~gned'
Pau, K. P~nce ~/'(~j~.[, i Title Senior Ddllincj Encjineer
Commission Use Only
Terrie Hubble, 564-4628
Date
Conditions of Approval: Notify Commission so representative may witness
.Pl~stic~'-~~~~a ranc e ·
Approved by order of the Commission Commissioner
Form 10-403 Rev. 06/15/88 -~"--'---~ ~ --
I Approval No. ~¢j,.)_ 10,.~
Date[ ~//~7
Submi{ In :l'~ip~cate
WELL PERMIT CHECKLISToo Y
FIELD
~NIT c~.Ass fP~z~ /
PROGRAM: expo dev ~ redrl~ servO wellbore segO ann disp para reqO
UNIT" //~ ~'~i) ON/OFF SHORE <1~ ~]
ADMI N I STRATI ON
ENGINEERING
D~TE
GEOLOGY
Permit fee attached ..................
Lease number appropriate ...............
Unique well name and number ..............
Well located in a defined pool .............
Well located proper distance from drlg unit boundary.
Well located proper distance from other wells ......
Sufficient acreage available in drilling unit ......
If deviated, is wellbore plat included .........
Operator only affected party ..............
Operator has appropriate bond in force .........
Permit can be issued without conservation order .....
Permit can be issued without administrative approval.
Can permit be approved before 15-day wait ........
REMARKS
14.
15.
16.
17.
18.
19
2O
21
22
23
24
25
26
27
28
29
Surface casing protects all known USDWs ........
CMT vol adequate to circulate on conductor & surf cng. .
CMT vol adequate to tie-in long string to surf cng . .
CMT will cover all known productive horizons ...... ~ N
Casing designs adequate for C, T, B & permafrost .... ~ N
Adequate tankage or reserve pit ............. N
If a re-drill, has a 10-403 for abndnmnt been approved.~ N
Adequate wellbore separation proposed ......... ~ N
If diverter required, is it adequate ..........
Drilling fluid program schematic & equip list adequate ~N
BOPEs adequate ....................
BOPE press rating adequate; test to--~,~O~ psig~' N
Choke manifold complies w/Al°I RP-53 (May 84) ......
Work will occur without operation shutdown ....... ~ N
Is presence of H2S gas probable ............ N
30. Permit can be issued w/o hydrogen sulfide measures .... Y N/
31. Data presented on potential overpressure zones ..... Y xN
32. Seismic analysis of shallow gas zones .......... Y/N ,/~W /z
33. Seabed condition survey (if off-shore) ......... / N ~ '
34. Contact name/phone for weekly progress reports .... /. Y N
[exploratory only] ~
GEOLOGY: ENGINEERING: COMMISSION:
Comments/Instructions:
HOW/dlf- A:\FORMS\cheklist rev 01/97
Well History File
APPENDIX
Information of detailed nature that is not
particularly germane to the Well Permitting Process
but is part of the history, file.
To improve the readability of the Well History file and to
simplify finding information, information of this
nature is accumulated at the end of the file under APPENDIX.
No special effort has been made to chronologically
organize this category of information.
F ECEIVED
. . SEP 0 5 '199~'
* ALASKA COMPUTING CENTER *
. Alaska Oil & Gas Cons. Commi~,s~
.............................. An~mge
* ............................ *
* ....... SCHLUMBERGER ....... *
. ............................ *
******************************
COMPANY NAME : ARCO ALASKA, INC.
WELL NAM~ : D. S . 7-28A
FIELD NAME : PRUDHOE BAY
BOROUGH : NORTH SLOPE
STATE · ALASKA
API NUMBER : 500292177001
REFERENCE NO : 97369
LIS Tape Verif;_~tion Listing
Schlumberger Alaska Computing Center
22-AUG-1997 13:35
PAGE:
**** REEL HEADER ****
SERVICE NA~E : EDIT
DATE · 97/08/22
ORIGIN . FLIC
REEL NAME : 97369
CONTINUATION # :
PREVIOUS REEL :
CO~VT : ARCO ALASKA INC., DS 7-28A, PRUDHOE BAY, API #50-029-21770-01
**** TAPE HEADER ****
SERVICE NAME : EDIT
DATE : 97/08/22
ORIGIN : FLIC
TAPE NAI~E : 97369
CONTINUATION # : 1
PREVIOUS TAPE :
COMPIENT : ARCO ALASKA INC., DS 7-28A, PRUDHOE BAY, API #50-029-21770-01
TAPE HEADER
PRUDHOE BAY
OPEN HOLE WIRELINE LOGS
WELL NAME:
OPERATOR:
LOGGING COMPANY:
TAPE CREATION DATE:
JOB DATA
JOB NUM~ER:
LOGGING ENGINEER:
OPERATOR WITNESS:
SURFACE LOCATION
SECTION:
RUN 1
97369
BARTZ
HAYWOOD
TOWNSHIP:
RANGE:
FNL:
FSL:
FEL:
FWL:
ELEVATION (FT FROM MSL O)
KELLY BUSHING:
DERRICK FLOOR:
GROUND LEVEL:
WELL CASING RECORD
1ST STRING
2ND STRING
D.S. 7-28A
500292177001
ARCO ALASKA, INC.
SCHLUMBERGER WELL SERVICES
21-AUG-97
RUN 2 RUN 3
33
lin
14E
394
339
53.25
51.75
24.10
OPEN HOLE CASING DRILLERS
BIT SIZE (IN) SIZE (IN) DEPTH (FT)
6. 000 7. 000 10561.0
LIS Tape Verif~ .~tion Listing
Schlumberger Alaska Computing Center
22-AUG-1997 13:35
3RD STRING
PRODUCTION STRING
CONTAINED HEREIN IS THE DATA ACQUIRED ON ARCO ALASKA,
INC. WELL DS 7-28A.
$
$
PAGE:
**** FILE HEADER ****
FILE NAME : EDIT .001
SERVICE : FLIC
VERSION : O01CO1
DATE : 97/08/22
MAX REC SIZE : 1024
FILE TYPE : LO
LAST FILE :
FILE HEADER
FILE NUNfl~ER: 1
EDITED OPEN HOLEMAIN PASS
Ail tool strings; Depth shifted and clipped curves; all runs merged; no cased hole data.
DEPTH INCREMENT: 0.5000
FILE SUPmLARY
LDWG TOOL CODE
AIT
BCS
CNT
SDN
$
BASELINE CURVE FOR SHIFTS:
CURVE SHIFT DATA (MEASURED DEPTH)
START DEPTH STOP DEPTH
12098.0 10568.0
12050.0 10568.0
12065.0 10568.0
12080.0 10568.0
BASELINE DEPTH
$
MERGED DATA SOURCE
LDWG TOOL CODE
$
REMARKS:
.......... EQUIVALENT UNSHIFTED DEPTH ..........
AIT BCS CNT SDN
RUN NO. PASS NO.
MERGE TOP MERGE BASE
THIS FILE CONTAINS THE CLIPPED AND EDITED DATA FOR THE
ARRAY INDUCTION TOOL (AIT) , BOREHOLE COMPENSATED SONIC
(BCS) , AND PLATFORM EXPRESS LITHO-DENSITY (SDN) AND
COMPENSATED NEUTRON (CNT) TOOLS. NO DEPTH SHIFTS WERE
APPLIED TO THIS DATA AS IT IS THE PRIMARY DEPTH
CONTROL LOG. THE DATA IN THIS FILE WAS ACQUIRED ONLY
OVER THE OPEN HOLE SECTION OF THIS LOGGING RUN.
$
LIS Tape Verif;~dtion Listing
Schlumberger Alaska Computing Center
22-AUG-1997 13:35
PAGE:
LIS FORMAT DATA
** DATA FORMAT SPECIFICATION RECORD **
** SET TYPE- 64EB **
TYPE REPR CODE VALUE
1 66 0
2 66 0
3 73 112
4 66 1
5 66
6 73
7 65
8 68 0.5
9 65 FT
11 66 9
12 68
13 66 0
14 65 FT
15 66 68
16 66 1
0 66 0
** SET TYPE - CHAN **
NAME SERV UNIT SERVICE API API API API FILE NUMB NUMB SIZE REPR PROCESS
ID ORDER # LOG TYPE CLASS MOD NUMB SAMP ELEM CODE (HEX)
DEPT FT 1022686 O0 000 O0 0 1 1 1 4 68 0000000000
SP AIT MV 1022686 O0 000 O0 0 1 1 1 4 68 0000000000
GR AIT GAPI 1022686 O0 000 O0 0 1 1 1 4 68 0000000000
TENS AIT LB 1022686 O0 000 O0 0 1 1 1 4 68 0000000000
TEND AIT LB 1022686 O0 000 O0 0 1 1 1 4 68 0000000000
M~ES AIT 0H~1022686 O0 000 O0 0 1 1 1 4 68 0000000000
MTEMAIT DEGF 1022686 O0 000 O0 0 1 1 1 4 68 0000000000
CNTC CNT CPS 1022686 O0 000 O0 0 1 1 1 4 68 0000000000
CFTC CNT CPS 1022686 O0 000 O0 0 1 1 1 4 68 0000000000
FCNT CNT CPS 1022686 O0 000 O0 0 1 1 1 4 68 0000000000
NCNTCNT CPS 1022686 O0 000 O0 0 1 1 1 4 68 0000000000
CRAT CNT 1022686 O0 000 O0 0 1 1 1 4 68 0000000000
NRAT CNT 1022686 O0 000 O0 0 1 1 1 4 68 0000000000
NPHI CArT PU-S 1022686 O0 000 O0 0 1 1 1 4 68 0000000000
CPHI CNT PU-S 1022686 O0 000 O0 0 1 1 1 4 68 0000000000
DT BCS US/F 1022686 O0 000 O0 0 1 1 1 4 68 0000000000
CALl SDN IN 1022686 O0 000 O0 0 1 1 1 4 68 0000000000
DRHO SDN G/C3 1022686 O0 000 O0 0 1 1 1 4 68 0000000000
PEF SDN BN/E 1022686 O0 000 O0 0 1 1 1 4 68 0000000000
RHOB SDN G/C3 1022686 O0 000 O0 0 1 1 1 4 68 0000000000
MSFL SDN 0H~1022686 O0 000 O0 0 1 1 1 4 68 0000000000
LIS Tape Verification Listing
Schlumberger Alaska Computing Center
22-AUG-1997 13:35
PAGE:
NAME SERV UNIT SERVICE API API API API FILE NUMB NUMB SIZE REPR PROCESS
ID ORDER # LOG TYPE CLASS MOD NUMB SAMP ELEM CODE (HEX)
MINVSDN 0H~4~1022686 O0 000 O0 0 1 1 1 4 68 0000000000
f4NORSDN 0H~4~1022686 O0 000 O0 0 1 1 1 4 68 0000000000
AFiO AIT OP~V~l1022686 O0 000 O0 0 1 1 1 4 68 0000000000
AF20 AIT OP~4~ 1022686 O0 000 O0 0 1 1 1 4 68 0000000000
AF30 AIT OH~I 1022686 O0 000 O0 0 1 1 1 4 68 0000000000
AF60 AIT 0H~4~1022686 O0 000 O0 0 1 1 1 4 68 0000000000
AF90 AIT 0PH~I1022686 O0 000 O0 0 1 1 1 4 68 0000000000
** DATA **
DEPT. 12097
TEND.AIT 479
CFTC. CNT -999
1FRAT. CNT -999
CAL1.SDN -999
MSFL.SDN -999
AF20.AIT -999.
000 SP.AIT -999.250 GR.AIT
819 MRES.AIT -999.250 MTEM. AIT
250 FCNT. CNT -999.250 NCNT. CNT
250 NPHI.CNT -999.250 CPHI.CNT
250 DRHO.SDN -999.250 PEF. SDN
250 MINV. SDN -999.250 f4NOR.SDN
250 AF30.AIT -999.250 AF60.AIT
DEPT. 10568.000
TEND.AIT 754.153
CFTC. CNT 1582.891
1VRAT. CNT 2.244
CAL1.SDN 6.244
MSFL.SDN 7.000
AF20.AIT -999.250
SP.AIT -999.250 GR.AIT
F~qES.AIT 0.127 MTEM. AIT
FCNT. CNT 1457.057 NCNT. CNT
NPHI.CNT 23.649 CPHI.CNT
DRHO.SDN 0.022 PEF. SDN
MINV. SDN 1.089 FiNOR.SDN
AF30.AIT -999.250 AF60.AIT
-999 250 TENS.AIT
-999 250 CNTC. CNT
-999 250 CRAT. CNT
-999 250 DT. BCS
-999 250 RHOB.SDN
-999 250 AFiO.AIT
-999.250 AF90.AIT
368.667 TENS.AIT
168.934 CNTC. CNT
3333.454 CRAT. CNT
23.001 DT. BCS
3.956 RHOB.SDN
1.441 AFIO.AIT
-999.250 AF90.AIT
2175.000
-999.250
-999.250
-999.250
-999.250
-999.250
-999.250
1520.000
3374.077
2.165
92. I00
2. 364
-999.250
-999.250
** END OF DATA **
**** FILE TRAILER ****
FILE NAM~ : EDIT .001
SERVICE : FLIC
VERSION : O01CO1
DATE ' 97/08/22
MAX REC SIZE : 1024
FILE TYPE : LO
LAST FILE :
LIS Tape Verif~,~tion Listing
Schlumberger Alaska Computing Center
22-AUG-1997 13:35
PAGE:
**** FILE HEADER ****
FILE NA~E : EDIT .002
SERVICE : FLIC
VERSION : O01CO1
DATE : 97/08/22
MAX REC SIZE : 1024
FILE TYPE : LO
LAST FILE :
FILE HEADER
FILE NUMBER: 2
EDITED CASED HOLE MAIN PASS
Depth shifted and clipped curves for open hole logs run into casing.
PASS NUMBER: 1
DEPTH INCREMENT: 0.5000
FILE SUMMARY
LDWG TOOL CODE START DEPTH
CNT 10568.0
$
BASELINE CURVE FOR SHIFTS:
CURVE SHIFT DATA (MEASURED DEPTH)
STOP DEPTH
10354.0
BASELINE DEPTH
$
.......... EQUIVALENT UNSHIFTEDDEPTH ..........
CNT
THIS FILE CONTAINS THE CLIPPED AND EDITED DATA FOR THE
PLATFORM EXPRESS COMPENSATED NEUTRON TOOL (CNT). NO
DEPTH SHIFTS WERE APPLIED TO THIS DATA AS IT IS THE
PRIMARY DEPTH CONTROL LOG. THE DATA IN THIS FILE WAS
ACQUIRED ONLY OVER THE CASED HOLE SECTION OF THIS
LOGGING RUN.
$
LIS FORMAT DATA
** DATA FORMAT SPECIFICATION RECORD **
** SET TYPE- 64EB **
TYPE REPR CODE VALUE
1 66 0
2 66 0
3 73 48
4 66 1
LIS Tape Verification Listing
Schlumberger Alaska Computing Center
22-AUG-1997 13:35
PAGE:
TYPE REPR CODE VALUE
5 66
6 73
7 65
8 68 0.5
9 65 FT
11 66 21
12 68
13 66 0
14 65 FT
15 66 68
16 66 1
0 66 1
** SET TYPE - CHAN **
NAME SERV UNIT SERVICE API API API API FILE NUMB NUMB SIZE REPR PROCESS
ID ORDER # LOG TYPE CLASS MOD NUM~ SAMP ELEM CODE (HEX)
DEPT FT 1022686 O0 000 O0 0 2 1 1 4 68 0000000000
TENS AIT LB 1022686 O0 000 O0 0 2 1 1 4 68 0000000000
TEND AIT LB 1022686 O0 000 O0 0 2 1 1 4 68 0000000000
GRCHAIT GAPI 1022686 O0 000 O0 0 2 1 1 4 68 0000000000
CNTC CNT CPS 1022686 O0 000 O0 0 2 1 1 4 68 0000000000
CFTC CNT CPS 1022686 O0 000 O0 0 2 1 1 4 68 0000000000
FCl~f cArT CPS 1022686 O0 000 O0 0 2 1 1 4 68 0000000000
NCNTCNT CPS 1022686 O0 000 O0 0 2 1 1 4 68 0000000000
CRAT CNT 1022686 O0 000 O0 0 2 1 1 4 68 0000000000
IV~AT CNT 1022686 O0 000 O0 0 2 1 1 4 68 0000000000
NPHI CNT PU-S 1022686 O0 000 O0 0 2 1 1 4 68 0000000000
CPHI CNT PU-S 1022686 O0 000 O0 0 2 1 1 4 68 0000000000
** DATA **
DEPT. 10568.000 TENS.AIT 1520.000 TEND.AIT 754.153 GRCH.AIT
CNTC. CNT 3374.077 CFTC. CNT 1582.891 FCNT. CNT 1457.057 NCNT. CNT
CRAT. CNT 2.165 NRAT. CNT 2.244 NPHI.CNT 23.649 CPHI.CNT
DEPT. 10354.000 TENS.AIT 509.000 TEND.AIT 918.356 GRCH.AIT
CNTC. CNT 1370.843 CFTC. CNT 384.733 FCNT. CNT 368.118 NCNT. CNT
CRAT. CNT 3.573 NRAT. CNT 3.597 NPHI.CNT 47.329 CPHI.CNT
368.667
3333.454
23.001
86.464
1409.421
45.435
** END OF DATA **
LIS Tape Verification Listing
Schlumberger Alaska Computing Center
22-AUG-1997 13:35
PAGE:
**** FILE TRAILER ****
FILE NAME : EDIT .002
SERVICE : FLIC
VERSION : O01CO1
DATE : 97/08/22
MAX REC SIZE : 1024
FILE TYPE : LO
LAST FILE :
**** FILE HEADER ****
FILE NAME : EDIT .003
SERVICE : FLIC
VERSION : O01CO1
DATE ' 97/08/22
MAX REC SIZE : 1024
FILE TYPE : LO
LAST FILE :
RUN NUMBER:
TOOL STRING NUMBER:
PASS NUMBER:
DEPTH INCREMENT:
FILE S~Y
FILE HEADER
FILE NUMBER 3
RAW OPEN HOLEMAIN PASS
Curves and log header data for each run and tool string in separate files; Tool String #1 fo
Sadlerochit run presented first (primary depth control string used to depth shift the Sadler
interval) followed by files for other main pass tool strings per run.
1
1
1
0.5000
VENDOR TOOL CODE START DEPTH STOP DEPTH
AIT 12097.5 10568.0
BHC 12097.5 10568.0
PEX 12097.5 10568.0
$
LOG HEADER DATA
DATE LOGGED:
SOFTWARE VERSION:
TIME CIRCULATION ENDED:
TIME LOGGER ON BOTTOM:
TD DRILLER (FT) :
TD LOGGER (FT) :
TOP LOG INTERVAL (FT) :
BOTTOM LOG INTERVAL (FT) :
LOGGING SPEED (FPHR) :
TOOL STRING (TOP TO BOTTOM)
VENDOR TOOL CODE TOOL TYPE
8-AUG-97
8C0 - 609
1200 7-AUG-97
915 8-AUG-97
12103.0
12100.0
10568.0
12068.0
1800.0
TOOL NUMBER
LIS Tape Verification Listing
Schlumberger Alaska Computing Center
22-AUG-1997 13:35
PAGE:
PEX
AIT
$
PLATFORM EXPRESS
ARRAY INDUCTION TOOL
HILTB-DTB
AIT-H
BOREHOLE AND CASING DATA
OPEN HOLE BIT SIZE (IN):
DRILLERS CASING DEPTH (FT):
LOGGERS CASING DEPTH (FT) :
6. 000
10561.0
10568.0
BOREHOLE CONDITIONS
MUD TYPE:
MUD DENSITY (LB/G):
MUD VISCOSITY (S) :
MUD PH :
FLUID LOSS (C3):
MAXIMUM RECORDED TEMPERATURE (DEGF) :
RESISTIVITY (OH~Of) AT TEMPERATURE (DEGF):
MUD AT ~iEASURBD TEMPERATURE (MT):
MUD AT BOTTOM HOLE TEMPERATURE (BHT):
MUD FILTRATE AT (MT):
MUD FILTRATE AT (BHT) :
MUD CAKE AT (MT):
MUD CAKE AT (BHT) :
QUI~RILN-N
8.70
48.0
9.0
190.0
O. 308 65.0
O . 308 52.0
O. 392 65.0
NEUTRON TOOL
TOOL TYPE (EPITHERMAL OR THERMAL): THERMAL
MATRIX: SANDSTONE
MATRIX DENSITY: 2.65
HOLE CORRECTION (IN): 6. 000
TOOL STANDOFF (IN): O. 1
REMARKS: ALL TOOLS RUN IN COMBINATION & CONVEYED
BY DRILL PIPE.
THREE .5" STANDOFFS RUN ON INDUCTION & FOUR
.5" STANDOFFS RUN ON SONIC. TWO TOOL TURNERS
RUN ON PEX TO ORIENT NUC TOOLS PAD-SIDE-DOWN
SANDSTONE MATRIX.
DEPTH OFFSET OF +6.5; MADE TO ALL LOGS BY CLIENT
REQUEST TO MATCH MWD.
TEMPERATURE TAKEN FROM PLATFORM EXPRESS & AMS
BOREHOLE TEMPERATURE SIGNALS.
POOR SONIC CASING CHECK (57 us/f).
INCLUDED A TRANSIT TIME LQC PASS WITH SONIC LOG.
ACCELERO~ETER NOT CALIBRATED BEFORE JOB AND WAS
NOT USED FOR SPEED CORRECTION.
THIS IS THE RAW (OPEN HOLE) MAIN PASS PEX/BHC/AIT
DATA PRESENTED AT 0.5' SAMPLE RATE.
$
LIS FORMAT DATA
LIS Tape Verifluation Listing
Schlumberger Alaska Computing Center
22-AUG-1997 13:35
PAGE:
** DATA FORF~T SPECIFICATION RECORD **
** SET TYPE - 64EB **
TYPE REPR CODE VALUE
1 66 0
2 66 0
3 73 140
4 66 1
5 66
6 73
7 65
8 68 0.5
9 65 FT
11 66 7
12 68
13 66 0
14 65 FT
15 66 68
16 66 1
0 66 1
** SET TYPE - CHAN**
NAME SERV UNIT SERVICE API API API API FILE NUMB NUMB SIZE REPR PROCESS
ID ORDER # LOG TYPE CLASS MOD NUMB SAMP ELEM CODE (HEX)
DEPT FT 1022686 O0 000 O0 0 3 1 1 4 68 0000000000
SP AIT MV 1022686 O0 000 O0 0 3 1 1 4 68 0000000000
GR AIT GAPI 1022686 O0 000 O0 0 3 1 1 4 68 0000000000
TENS AIT LB 1022686 O0 000 O0 0 3 1 1 4 68 0000000000
HTENAIT LB 1022686 O0 000 O0 0 3 1 1 4 68 0000000000
~4~ES AIT 0tt~1022686 O0 000 O0 0 3 1 1 4 68 0000000000
MTEMAIT DEGF 1022686 O0 000 O0 0 3 1 1 4 68 0000000000
CNTC PEX CPS 1022686 O0 000 O0 0 3 1 1 4 68 0000000000
CFTC PEX CPS 1022686 O0 000 O0 0 3 1 1 4 68 0000000000
RCFT PEX CPS 1022686 O0 000 O0 0 3 1 1 4 68 0000000000
RCNT PEX CPS 1022686 O0 000 O0 0 3 1 1 4 68 0000000000
TNR~ PEX 1022686 O0 000 O0 0 3 1 1 4 68 0000000000
RTNR PEX 1022686 O0 000 O0 0 3 1 1 4 68 0000000000
TNPH PEX PU 1022686 O0 000 O0 0 3 1 1 4 68 0000000000
NPHI PEX PU 1022686 O0 000 O0 0 3 1 1 4 68 0000000000
NPOR PEX PU 1022686 O0 000 O0 0 3 1 1 4 68 0000000000
DT BHC US/Fl022686 O0 000 O0 0 3 1 1 4 68 0000000000
TT1 BHC US 1022686 O0 000 O0 0 3 1 1 4 68 0000000000
TT2 BHC US 1022686 O0 000 O0 0 3 1 1 4 68 0000000000
TT3 BHC US 1022686 O0 000 O0 0 3 1 1 4 68 0000000000
TT4 BHC US 1022686 O0 000 O0 0 3 1 1 4 68 0000000000
HCAL PEX IN 1022686 O0 000 O0 0 3 1 1 4 68 0000000000
RHOZ PEX G/C3 1022686 O0 000 O0 0 3 1 1 4 68 0000000000
I~DRA PEX G/C3 1022686 O0 000 O0 0 3 1 1 4 68 0000000000
PEFZ PEX 1022686 O0 000 O0 0 3 1 1 4 68 0000000000
DPHZ PEX PU 1022686 O0 000 O0 0 3 1 1 4 68 0000000000
LIS Tape Verification Listing
Schlumberger Alaska Computing Center
22-AUG-1997 13:35
PAGE:
10
NAME SERVUNIT SERVICE API API API API FILE NUMB NUMB SIZE REPR PROCESS
ID ORDBR # LOG TYPE CLASS MOD NUMB SAMP ELE~ CODE (HEX)
H~IN P~ Otff4M1022686 O0 000 O0 0 3 1 1 4 68 0000000000
HSINOPEX 0HY2~1022686 O0 000 O0 0 3 1 1 4 68 0000000000
Ri~OZPEX OH~R41022686 O0 000 O0 0 3 1 1 4 68 0000000000
RX08 PEX 0P24~1022686 O0 000 O0 0 3 1 1 4 68 0000000000
AFiO AIT 0HF241022686 O0 000 O0 0 3 1 1 4 68 0000000000
AF20 AIT 0H~241022686 O0 000 O0 0 3 1 1 4 68 0000000000
AF30 AIT 0HI~I1022686 O0 000 O0 0 3 1 1 4 68 0000000000
AF60 AIT 0P2~I1022686 O0 000 O0 0 3 1 1 4 68 0000000000
AF90 AIT OH~R41022686 O0 000 O0 0 3 1 1 4 68 0000000000
** DATA **
DEPT. 12097.500 SP.AIT -47.563 GR.AIT 100.635 TENS.AIT
HTEN.AIT -5.965 MRES.AIT 0.103 MTi~4. AIT 188.622 CNTC. PEX
CFTC.PEX 2132.179 RCFT. PEX 1946.604 RCNT.PEX 4118.977 TNRA.PEX
RTNR.PEX 2.085 TNPH. PEX 20.956 NPHI.PEX 21.390 NPOR.PEX
DT. BHC 71.800 TT1.BHC 467.600 TT2.BHC 322.400 TT3.BHC
TT4.BHC 312.400 HCAL.PEX 5.831 RHOZ.PEX -999.250 HDRA.PEX
PEFZ.PEX -999.250 DPHZ.PEX 60721.211 H~4IN. PEX 0.512 H~NO.PEX
RXOZ.PEX 9.885 RXOS.PEX 9,892 AFiO.AIT 13.282 AF20.AIT
AF30.AIT 21.835 AF60.AIT 20.821 AF90.AIT 20.858
DEPT.
HTEN. AIT
CFTC. PEX
RTNR. PEX
DT. BHC
TT4 .BHC
PEFZ. PEX
RXOZ. PEX
AF3 0 . AI T
10568.000
754 153
1582 891
2 244
92 100
391 200
3 956
7 000
3 408
SP.AIT -24.625 GR.AIT 368.667 TENS.AIT
MRES.AIT 0.127 MTE~.AIT 168.934 CNTC. PEX
RCFT. PEX 1457.057 RCNT. PEX 3333.454 TNRA.PEX
TNPH. PEX 23.001 NPHI.PEX 23.649 NPOR.PEX
TT1.BHC 600.400 TT2.BHC 392.800 TT3.BHC
HCAL.PEX 6.244 RHOZ.PEX 2.364 HDRA.PEX
DPHZ.PEX 17,359 H24IN. PEX 1.089 FflviNO. PEX
RXOS.PEX 7.688 AFiO.AIT 0.991 AF20.AIT
AF60.AIT 9.155 AF90.AIT 9.146
2361.000
4226.791
1,989
20.768
454,400
-999.250
0,847
21,045
1520.000
3374,077
2,165
22,367
604.800
0,022
1,441
2,937
** END OF DATA **
**** FILE TRAILER ****
FILE NAME : EDIT .003
SERVICE : FLIC
VERSION · O01CO1
DATE : 97/08/22
MAX REC SIZE : 1024
FILE TYPE : LO
LAST FILE :
LIS Tape Verification Listing
Schlumberger Alaska Computing Center
22-AUG-1997 13:35
PAGE:
11
**** FILE HEADER ****
FILE NA~E : EDIT .004
SERVICE : FLIC
VERSION · O01CO1
DATE : 97/08/22
MAX REC SIZE : 1024
FILE TYPE : LO
LAST FILE :
RUN NUMBER:
TOOL STRING NUMBER:
PASS NUM~ER:
DEPTH INCREMENT:
FILE SO?4MARY
FILE HEADER
FILENO!W_BER 4
RAW OPEN HOLEMAIN PASS
Curves and log header data for each run and tool string in separate files; Tool String #1 fo
Sadlerochit run presented first (primary depth control string used to depth shift the Sadler
interval) followed by files for other main pass tool strings per run.
1
1
1
O. 2500
VENDOR TOOL CODE START DEPTH STOP DEPTH
AIT 12097.5 10568.0
BHC 12097.5 10568.0
PEX 12097.5 10568.0
$
LOG HEADER DATA
DATE LOGGED:
SOFTWARE VERSION:
TIME CIRCULATION ENDED:
TIME LOGGER ON BOTTOM:
TD DRILLER (FT) :
TD LOGGER (FT) :
TOP LOG INTERVAL (FT) :
BOTTOM LOG INTERVAL (FT) :
LOGGING SPEED (FPHR) :
TOOL STRING (TOP TO BOTTOM)
VENDOR TOOL CODE TOOL TYPE
PEX PLATFORM EXPRESS
AIT ARRAY INDUCTION TOOL
$
BOREHOLE AND CASING DATA
OPEN HOLE BIT SIZE (IN):
DRILLERS CASING DEPTH (FT) :
LOGGERS CASING DEPTH (FT):
BOREHOLE CONDITIONS
8-AUG-97
8C0-609
1200 7-AUG-97
915 8-AUG-97
12103.0
12100.0
10568.0
12068.0
1800.0
TOOL NUMBER
HILTB -DTB
AIT-H
6. 000
10561.0
10568.0
LIS Tape Verification Listing
Schlumberger Alaska Computing Center
22-AUG-1997 13:35
PAGE:
12
MUD TYPE:
MUD DENSITY (LB/G):
MUD VISCOSITY (S) :
MUD PH:
FLUID LOSS (C3):
MAXIMUM RECORDED TEMPERATURE (DEGF)
RESISTIVITY (OP~4M) AT TEMPERATURE (DEGF)
MUD AT MEASURED TEMPERATURE (MT)
MUD AT BOTTOM HOLE TEMPERATURE (BHT)
MUD FILTRATE AT (MT):
MUD FILTRATE AT (BHT) :
MUD CAKE AT (MT):
MUD CAKE AT (BHT) :
QUIKDRILN-N
8.70
48.0
9.0
190.0
O. 308 65.0
0.308 52.0
O. 392 65.0
NEUTRON TOOL
TOOL TYPE (EPITHERMAL OR THERMAL): THERMAL
MATRIX: SANDSTONE
MATRIX DENSITY: 2.65
HOLE CORRECTION (IN): 6. 000
TOOL STANDOFF (IN): 0.1
REM~ARJ~S: ALL TOOLS RUN IN COMBINATION & CONVEYED
BY DRILL PIPE.
THREE .5" STANDOFFS RUN ON INDUCTION & FOUR
.5" STANDOFFS RUN ON SONIC. TWO TOOL TURNERS
RUN ON PEX TO ORIENT NUC TOOLS PAD-SIDE-DOWN
SANDSTONE MATRIX.
DEPTH OFFSET OF +6.5; MADE TO ALL LOGS BY CLIENT
REQUEST TO MATCH MWD.
TEMPERATURE TAKEN FROM PLATFORM EXPRESS & AMS
BOREHOLE TEMPERATURE SIGNALS.
POOR SONIC CASING CHECK (57 us/f).
INCLUDED A TRANSIT TIME LQC PASS WITH SONIC LOG.
ACCELEROM~TER NOT CALIBRATED BEFORE JOB AND WAS
NOT USED FOR SPEED CORRECTION.
THIS IS THE RAW (OPEN HOLE) MAIN PASS PEX/BHC/AIT
DATA ACQUIRED AT 0.25' SAMPLE RATE.
$
LIS FORMAT DATA
** DATA FORMAT SPECIFICATION RECORD **
** SET TYPE - 64EB **
TYPE REPR CODE VALUE
1 66 0
2 66 0
3 73 24
4 66 1
LIS Tape Verification Listing
Schlumberger Alaska Computing Center
22-AUG-1997 13:35
PAGE: 13
TYPE REPR CODE VALUE
5 66
6 73
7 65
8 68 O. 25
9 65 FT
11 66 42
12 68
13 66 0
14 65 FT
15 66 68
16 66 1
0 66 1
** SET TYPE - CHAN **
NAME SERV UNIT SERVICE API API API API FILE NUMB NUMB SIZE REPR PROCESS
ID ORDER # LOG TYPE CLASS MOD NUMB SAMP ELEM CODE (HEX)
DEPT FT 1022686 O0 000 O0 0 4 1 1 4 68 0000000000
AFiO AIT OH~M1022686 O0 000 O0 0 4 1 1 4 68 0000000000
AF20 AIT 0I~4~ 1022686 O0 000 O0 0 4 1 1 4 68 0000000000
AF30 AIT OHMM 1022686 O0 000 O0 0 4 1 1 4 68 0000000000
AF60 AIT 0t~4M1022686 O0 000 O0 0 4 1 1 4 68 0000000000
AF90 AIT Otff4M1022686 O0 000 O0 0 4 1 1 4 68 0000000000
** DATA **
DEPT. 12097.500 AFIO.AIT 13.282 AF20.AIT
AF60.AIT 20.821 AFgO.AIT 20.858
21. 045 AF30.AIT
21.835
** END OF DATA **
**** FILE TRAILER ****
FILE NAME : EDIT .004
SERVICE : FLIC
VERSION : O01CO1
DATE · 97/08/22
MAX REC SIZE : 1024
FILE TYPE : LO
LAST FILE :
LIS Tape Verification Listing
Schlumberger Alaska Computing Center
22-AUG-1997 13:35
PAGE:
14
**** FILE HEADER ****
FILE NAME : EDIT .005
SERVICE . FLIC
VERSION . O01CO1
mATE · 97/08/22
MAX REC SIZE : 1024
FILE TYPE : LO
LAST FILE :
FILE HEADER
FILE NO-M~ER 5
RAW OPEN HOLEMAIN PASS
Curves and log header data for each run and tool string in separate files; Tool String #1 fo
Sadlerochit run presented first (primary depth control string used to depth shift the Sadler
interval) followed by files for other main pass tool strings per run.
RUN NUMBER: 1
TOOL STRING NUMBER: 1
1
O. 1667
PASS NOY4~ER:
DEPTH INCREMENT:
FILE SUMMARY
VENDOR TOOL CODE START DEPTH STOP DEPTH
AIT 12097.5 10568.0
BHC 12097.5 10568.0
PEX 12097.5 10568.0
$
LOG HEADER DATA
DATE LOGGED:
SOFTWARE VERSION:
TIME CIRCULATION ENDED:
TIME LOGGER ON BOTTOM:
TDDRILLER (FT):
TDLOGGER(FT):
TOP LOG INTERVAL (FT):
BOTTOM LOG INTERVAL (FT):
LOGGING SPEED (FPHR):
TOOL STRING (TOP TO BOTTOM)
VENDOR TOOL CODE TOOL TYPE
.........................
PEX PLATFORM EXPRESS
AIT ARRAY INDUCTION TOOL
$
BOREHOLE AND CASING DATA
OPEN HOLE BIT SIZE (IN):
DRILLERS CASING DEPTH (FT) :
LOGGERS CASING DEPTH (FT):
BOREHOLE CONDITIONS
8-AUG-97
8C0 - 609
1200 7-AUG-97
915 8-AUG-97
12103.0
12100.0
10568.0
12068.0
1800.0
TOOL NUMBER
...........
HILTB -DTB
AIT-H
6. 000
10561.0
10568.0
LIS Tape Verification Listing
Schlumberger Alaska Computing Center
22-AUG-1997 13:35
PAGE:
15
MUD TYPE:
MUD DENSITY (LB/G):
MUD VISCOSITY (S) :
MUD PH:
FLUID LOSS (C3):
MAXIMUM RECORDED TEMPERATURE (DEGF) :
RESISTIVITY (OH~ff4) AT TEMPERATURE (DEGF) :
MUD AT MEASURED TEMPERATURE (MT):
MUD AT BOTTOM HOLE TEMPERATURE (BHT):
MUD FILTRATE AT (MT):
MUD FILTRATE AT (BHT) :
MUD CAKE AT (MT):
MUD CAKE AT (BHT):
QUIKDRILN-N
8.70
48.0
9.0
190.0
O. 308 65.0
O. 308 52.0
O. 392 65.0
NEUTRON TOOL
TOOL TYPE (EPITHERMAL OR THERMAL): THERMAL
MATRIX: SANDSTONE
MATRIX DENSITY: 2.65
HOLE CORRECTION (IN): 6. 000
TOOL STANDOFF (IN) '. O. 1
REMARKS: ALL TOOLS RUN IN COMBINATION & CONVEYED
BY DRILL PIPE.
THREE .5" STANDOFFS RUN ON INDUCTION & FOUR
.5" STANDOFFS RUN ON SONIC. TWO TOOL TURNERS
RUN ON PEX TO ORIENT NUC TOOLS PAD-SIDE-DOWN
SANDSTONE MATRIX.
DEPTH OFFSET OF +6.5; MADE TO ALL LOGS BY CLIENT
REQUEST TO MATCH MWD.
TEMPERATURE TAKEN FROM PLATFORM EXPRESS & AMS
BOREHOLE TEMPERATURE SIGNALS.
POOR SONIC CASING CHECK (57 us/f).
INCLUDED A TRANSIT TIME LQC PASS WITH SONIC LOG.
ACCELEROMETER NOT CALIBRATED BEFORE JOB AND WAS
NOT USED FOR SPEED CORRECTION.
THIS IS THE RAW (OPEN HOLE) MAIN PASS PEX/BHC/AIT
DATA ACQUIRED AT 0.1667' SAMPLE RATE.
$
LIS FORMAT DATA
** DATA FORMAT SPECIFICATION RECORD **
** SET TYPE - 64EB **
TYPE REPR CODE VALUE
1 66 0
2 66 0
3 73 80
4 66 1
LIS Tape Verification Listing
Schlumberger Alaska Computing Center
22-AUG-1997 13:35
PAGE: 16
TYPE REPR CODE VALUE
5 66
6 73
7 65
8 68 0.166
9 65 FT
11 66 12
12 68
13 66 0
14 65 FT
15 66 68
16 66 1
0 66 1
** SET TYPE - CHAN **
NAME SERV UNIT SERVICE API API API API FILE NUMB NUMB SIZE REPR PROCESS
ID ORDER # LOG TYPE CLASS MOD NUM~ SAMP ELEM CODE (HEX)
O0 000 O0 0 $ 1 1 4 68 0000000000
DEPT FT 1022686
RHOZ PEX G/C3 1022686 O0 000 O0 0 5 1 1 4 68 0000000000
HDRA PEX G/C3 1022686 O0 000 O0 0 5 1 1 4 68 0000000000
PEFZ PEX 1022686 O0 000 O0 0 5 1 1 4 68 0000000000
DPHZ PEX PU 1022686 O0 000 O0 0 5 1 1 4 68 0000000000
H~IN PEX OH~M1022686 O0 000 O0 0 5 1 1 4 68 0000000000
I~4NO PEX OHI4M1022686 O0 000 O0 0 5 1 1 4 68 0000000000
RXOZ PEX 0H~1022686 O0 000 O0 0 5 1 1 4 68 0000000000
RX08 PEX OHI4~1022686 O0 000 O0 0 $ 1 1 4 68 0000000000
HCNT PEX CPS 1022686 O0 000 O0 0 5 1 1 4 68 0000000000
HCFT PEX CPS 1022686 O0 000 O0 0 5 1 1 4 68 0000000000
HGR PEX GAPI 1022686 O0 000 O0 0 5 1 1 4 68 0000000000
RHFT PEX CPS 1022686 O0 000 O0 0 5 1 1 4 68 0000000000
RI{ATTPEX CPS 1022686 O0 000 O0 0 5 1 1 4 68 0000000000
HTNP PEX PU 1022686 O0 000 O0 0 5 1 1 4 68 0000000000
HNPO PEX PU 1022686 O0 000 O0 0 $ 1 1 4 68 0000000000
TT1 BHC US 1022686 O0 000 O0 0 5 1 1 4 68 0000000000
TT2 BHC US 1022686 O0 000 O0 0 5 1 1 4 68 0000000000
TT3 BHC US 1022686 O0 000 O0 0 $ 1 1 4 68 0000000000
TT4 BHC US 1022686 O0 000 O0 0 5 1 1 4 68 0000000000
** DATA **
DEPT. 12097.500 RHOZ.PEX -999.250 HDRA.PEX -999.250 PEFZ.PEX
DPHZ.PEX 60721.211 PZMIN. PEX 0.512 H~INO.PEX 0.847 RXOZ.PEX
RXO8.PEX 9.892 HCNT.PEX 4226.790 HCFT. PEX 2132.179 HGR.PEX
RHFT. PEX 1946.604 PJ{NT. PEX 4118.977 HTNP.PEX 20.956 ]{NPO.PEX
TT1.BHC 467.600 TT2.BHC 322.400 TT3.BHC 454.400 TT4.BHC
-999.250
9.885
100.635
20.768
312.400
LIS Tape Verification Listing
Schlumberger Alaska Computing Center
22-AUG-1997 13:35
PAGE '.
17
** END OF DATA **
* * * * FILE TRAILER ** * *
FILE NAME : EDIT .005
SERVICE : FLIC
VERSION : O01CO1
DATE : 97/08/22
MAX REC SIZE '. 1024
FILE TYPE : LO
LAST FILE :
**** FILE HEADER ****
FILE NA~E : EDIT .006
SERVICE : FLIC
VERSION : O01CO1
DATE : 97/08/22
MAX REC SIZE : 1024
FILE TYPE : LO
LAST FILE :
RUN~ER:
TOOL STRING NUMBER:
PASS NUMBER:
DEPTH INCREMENT:
FILE SO?4MARY
FILE HEADER
FILE NUMBER 6
RAW OPEN HOLEMAIN PASS
Curves and log header data for each run and tool string in separate files; Tool String #1 fo
Sadlerochit run presented first (primary depth control string used to depth shift the Sadler
interval) followed by files for other main pass tool strings per run.
1
1
1
0.0833
VENDOR TOOL CODE START DEPTH STOP DEPTH
AIT 12097.5 10568.0
BHC 12097.5 10568.0
PEX 12097.5 10568.0
$
LOG HEADER DATA
DATE LOGGED:
SOFTWARE VERSION:
TIME CIRCULATION ENDED:
TIME LOGGER ON BOTTOM:
TD DRILLER (FT) :
TD LOGGER (FT) :
TOP LOG INTERVAL (FT) :
8-AUG-97
8C0-609
1200 7-AUG-97
915 8-AUG-97
12103.0
12100.0
10568.0
LIS Tape Verification Listing
Schlumberger Alaska Computing Center
22-AUG-1997 13:35
PAGE: 18
BOTTOM LOG INTERVAL (FT) :
LOGGING SPEED (FPHR) :
12068.0
1800.0
TOOL STRING (TOP TO BOTTOM)
VENDOR TOOL CODE TOOL TYPE
PEX PLATFORM EXPRESS
AIT ARRAY INDUCTION TOOL
$
TOOL NUMBER
HILTB-DTB
AIT-H
BOREHOLE AND CASING DATA
OPEN HOLE BIT SIZE (IN)
DRILLERS CASING DEPTH (FT)
LOGGERS CASING DEPTH (FT)
6.000
10561.0
10568.0
BOREHOLE CONDITIONS
MUD TYPE:
MUD DENSITY (LB/G):
MUD VISCOSITY (S) :
MUD PH:
FLUID LOSS (C3):
MAXIMUM RECORDED TEMPERATURE (DEGF) :
RESISTIVITY (OH~4) AT TEMPERATURE (DEGF) :
MUD AT M~ASURED TE~IPERATURE (MT):
MUD AT BOTTOM HOLE TEMPERATURE (BHT) :
MUD FILTRATE AT (MT):
MUD FILTRATE AT (BHT) :
MUD CAKE AT (MT):
MUD CAKE AT (BHT) :
QUIKDRILN-N
8.70
48.0
9.0
190.0
O. 308 65.0
0.308 52.0
O. 392 65.0
NEUTRON TOOL
TOOL TYPE (EPITHERMAL OR THERMAL):
MATRIX:
MATRIX DENSITY:
HOLE CORRECTION (IN):
THERMAL
SANDSTONE
2.65
6. 000
TOOL STANDOFF (IN):
0.1
ALL TOOLS RUN IN COMBINATION & CONVEYED
BY DRILL PIPE.
THREE .5" STA1VDOFFS RUN ON INDUCTION & FOUR
.5" STANDOFFS RUN ON SONIC. TWO TOOL TURNERS
RUN ON PEX TO ORIENT NUC TOOLS PAD-SIDE-DOWN
SANDSTONE MATRIX.
DEPTH OFFSET OF +6.5; MADE TO ALL LOGS BY CLIENT
REQUEST TO MATCH MWD.
TEMPERATURE TAKEN FROM PLATFORM EXPRESS & AMS
BOREHOLE TEMPERATURE SIGNALS.
POOR SONIC CASING CHECK (57 us/f).
INCLUDED A TRANSIT TIME LQC PASS WITH SONIC LOG.
ACCELEROMETER NOT CALIBRATED BEFORE JOB AND WAS
NOT USED FOR SPEED CORRECTION.
THIS IS THE RAW (OPEN HOLE) MAIN PASS PEX/BHC/AIT
DATA ACQUIRED AT 0.0833' SAMPLE RATE.
$
LIS Tape Verification Listing
Schlumberger Alaska Computing Center
22-AUG-1997 13:35
PAGE:
19
LIS FORMAT DATA
** DATA FORMAT SPECIFICATION RECORD **
** SET TYPE- 64EB **
TYPE REPR CODE VALUE
1 66 0
2 66 0
3 73 8
4 66 1
5 66
6 73
7 65
8 68 0.083
9 65 FT
11 66 128
12 68
13 66 0
14 65 FT
15 66 68
16 66 1
0 66 1
** SET TYPE - CHAN **
NA~E SERV UNIT SERVICE API API API API FILE NUMB NUMB SIZE REPR PROCESS
ID ORDER # LOG TYPE CLASS MOD NUMB SAMP ELEM CODE (HEX)
DEPT FT 1022686 O0 000 O0 0 6 1 1 4 68 0000000000
HCAL PEX IN 1022686 O0 000 O0 0 6 1 1 4 68 0000000000
DATA **
DEPT. 12097.500 HCAL.PEX 5.831
** END OF DATA **
LIS Tape Verification Listing
Schlumberger Alaska Computing Center
22-AUG-1997 13:35
PAGE
2O
**** FILE TRAILER ****
FILE NAME : EDIT .006
SERVICE : FLIC
VERSION : O01CO1
DATE : 97/08/22
MAX REC SIZE : 1024
FILE TYPE : LO
LAST FILE :
**** FILE HEADER ****
FILE NAME : EDIT .007
SERVICE : FLIC
VERSION : O01CO1
DATE : 97/08/22
MAX REC SIZE : 1024
FILE TYPE : LO
LAST FILE :
FILE HEADER
FILENUM~ER 7
RAW OPEN HOLEREPEAT PASSES
Curves and log header data for each pass, tool string, and run in separate files.
RUN NUMBER: 1
TOOL STRING ~ER: 1
PASS ~ER : 2
DEPTH INC~: 0.5000
FILE SO!V~4ARY
VENDOR TOOL CODE START DEPTH
AIT 12096.5
BHC 12096.5
PEX 12096.5
$
LOG HEADER DATA
DATE LOGGED:
SOFTWARE VERSION:
TIME CIRCULATION ENDED:
TIME LOGGER ON BOTTOM:
TD DRILLER (FT) :
TD LOGGER (FT):
TOP LOG INTERVAL (FT) :
BOTTOM LOG INTERVAL (FT) :
LOGGING SPEED (FPHR):
STOP DEPTH
11376.0
11376.0
11376.0
TOOL STRING (TOP TO BOTTOM)
VENDOR TOOL CODE TOOL TYPE
PEX PLATFORM EXPRESS
AIT ARRAY INDUCTION TOOL
8-AUG-97
8C0-609
1200 7-AUG-97
915 8-AUG-97
12103.0
12100.0
10568.0
12068.0
1800.0
TOOL NUMBER
HILTB-DTB
AIT-H
LIS Tape Verification Listing
Schlumberger Alaska Computing Center
22-AUG-1997 13:35
PAGE: 21
BOREHOLE AND CASING DATA
OPEN HOLE BIT SIZE (IN)
DRILLERS CASING DEPTH (FT)
LOGGERS CASING DEPTH (FT)
BOREHOLE CONDITIONS
MUD TYPE:
MUD DENSITY (LB/G):
MUD VISCOSITY (S) '.
MUD PH:
FLUID LOSS (C3):
MAXIMUM RECORDED TEMPERATURE (DEGF) :
RESISTIVITY (OH~4) AT TEMPERATURE (DEGF) :
MUD AT MEASURED TEMPERATURE (MT):
MUD AT BOTTOM HOLE TEMPERATURE (BHT) :
MUD FILTRATE AT (MT):
MUD FILTRATE AT (BHT) :
MUD CAKE AT (MT):
MUD CAKE AT (BHT) :
6. 000
10561.0
10568.0
QUIKDRILN-N
8.70
48.0
9.0
190.0
O. 308 65.0
0.308 52.0
O. 392 65.0
NEUTRON TOOL
TOOL TYPE (EPITHERMAL OR THERMAL): THERMAL
MATRIX: SANDSTONE
MATRIX DENSITY: 2.65
HOLE CORRECTION (IN): 6. 000
TOOL STANDOFF (IN): O. 1
REMARKS: ALL TOOLS RUN IN COMBINATION & CONVEYED
BY DRILL PIPE.
THREE .5" STANDOFFS RUN ON INDUCTION & FOUR
.5" STANDOFFS RUN ON SONIC. TWO TOOL TURNERS
RUN ON PEX TO ORIENT NUC TOOLS PAD-SIDE-DOWN
SANDSTONE MATRIX.
DEPTH OFFSET OF +6.5; MADE TO ALL LOGS BY CLIENT
REQUEST TO MATCH MWD.
TEMPERATURE TAKEN FROM PLATFORM EXPRESS & AMS
BOREHOLE TEMPERATURE SIGNALS.
POOR SONIC CASING CHECK (57 us/f).
INCLUDED A TRANSIT TIME LQC PASS WITH SONIC LOG.
ACCELEROMETER NOT CALIBRATED BEFORE JOB AND WAS
NOT USED FOR SPEED CORRECTION.
THIS IS THE RAW (OPEN HOLE) REPEAT PASS PEX/BHC/AIT
DATA AT 0.5' SAMPLE RATE.
$
LIS FORMAT DATA
LIS Tape Verification Listing
Schlumberger Alaska Computing Center
22-AUG-1997 13:35
PAGE: 22
** DATA FORMAT SPECIFICATION RECORD **
** SET TYPE - 64EB **
TYPE REPR CODE VALUE
1 66 0
2 66 0
3 73 68
4 66 1
5 66
6 73
7 65
8 68 0.5
9 65 FT
11 66 15
12 68
13 66 0
14 65 FT
15 66 68
16 66 1
0 66 1
** SET TYPE - CHAN **
NAME SERV UNIT SERVICE API API API API FILE NUMB NUMB SIZE REPR PROCESS
ID ORDER # LOG TYPE CLASS MOD NUMB SAMP ELEM CODE (HEX)
DEPT FT 1022686
SP AIT MV 1022686
GR AIT GAPI 1022686
TENS AIT LB 1022686
HTEN AIT LB 1022686
14~ES AIT OHMM 1022686
MTEM AIT DEGF 1022686
CNTC PEX CPS 1022686
CFTC PEX CPS 1022686
RCFT PEX CPS 1022686
RCNT PEX CPS 1022686
TNRA PEX 1022686
RTNR PEX 1022686
TNPH PEX PU 1022686 O0
NPHI PEX PU 1022686 O0
NPOR PEX PU 1022686 O0
DT BHC US/F 1022686 O0
O0 000 O0 0 7 1 1 4 68 0000000000
O0 000 O0 0 7 1 1 4 68 0000000000
O0 000 O0 0 7 1 1 4 68 0000000000
O0 000 O0 0 7 1 1 4 68 0000000000
O0 000 O0 0 7 1 1 4 68 0000000000
O0 000 O0 0 7 1 1 4 68 0000000000
O0 000 O0 0 7 1 1 4 68 0000000000
O0 000 O0 0 7 1 1 4 68 0000000000
O0 000 O0 0 7 1 1 4 68 0000000000
O0 000 O0 0 7 1 1 4 68 0000000000
O0 000 O0 0 7 1 1 4 68 0000000000
O0 000 O0 0 7 1 1 4 68 0000000000
O0 000 O0 0 7 1 1 4 68 0000000000
000 O0 0 7 1 1 4 68 0000000000
000 O0 0 7 1 1 4 68 0000000000
000 O0 0 7 1 1 4 68 0000000000
000 O0 0 7 1 1 4 68 0000000000
** DATA **
DEPT. 12096.500 SP.AIT -2.438 GR.AIT 125.794 TENS.AIT
HTEN.AIT 493.697 ~ES.AIT 0.096 MTEM. AIT 189.527 CNTC.PEX
CFTC.PEX 1897.951 RCFT. PEX 1735.560 RCNT. PEX 3506.207 TNRA.PEX
RTNR.PEX 2.001 TNPH. PEX 19.605 NPHI~PEX 20.160 NPOR.PEX
2301.000
3594.058
1.909
19.392
LIS Tape Verification Listing
Schlumberger Alaska Computing Center
22-AUG-1997 13:35
PAGE: 23
DT. BHC 72.300
DEPT. 11376. 000 SP. AIT
HTEN. AIT 969. 225 MRES. AIT
CFTC. PEX 1613 . 778 RCFT. PEX
RTNR. PEX 1.976 TNPH. PEX
DT. BHC 92.900
-28.188 GR.AIT
0.106 MTEM.AIT
1719.587 RCNT. PEX
25.254 NPHI.PEX
58.521 TENS.AIT
179.145 CNTC. PEX
3948.656 TNRA.PEX
25.654 NPOR.PEX
2013.000
3649.957
2.272
24.356
** ~D OF DATA **
**** FILE TRAILER ****
FILE NAME : EDIT .007
SERVICE : FLIC
VERSION ' O01CO1
DATE · 97/08/22
MAX REC SIZE : 1024
FILE TYPE : LO
LAST FILE :
**** FILE H~ER ****
FILE NAME : EDIT .008
SERVICE : FLIC
VERSION : O01CO1
DATE : 97/08/22
MAX REC SIZE : 1024
FILE TYPE : LO
LAST FILE :
FILE HEADER
FILE NUSiBER 8
RAW OPEN HOLEREPEAT PASSES
Curves and log header data for each pass, tool string, and run in separate files.
RUN NUMBER: 1
TOOL STRING NUMBER: 1
PASS NUMBER: 2
DEPTH INCREFIENT: 0.2500
FILE SUlVRgARY
VENDOR TOOL CODE START DEPTH
AIT 12096.5
BHC 12096.5
PEX 12096.5
$
LOG HEADER DATA
DATE LOGGED:
SOFTWARE VERSION:
STOP DEPTH
11376.0
11376.0
11376.0
8-AUG-97
8C0-609
LIS Tape Verification Listing
Schlumberger Alaska Computing Center
22-AUG-1997 13:35
PAGE:
24
TIME CIRCULATION ENDED:
TIME LOGGER ON BOTTOM:
TD DRILLER (FT) :
TD LOGGER (FT) :
TOP LOG INTERVAL (FT) :
BOTTOM LOG INTERVAL (FT):
LOGGING SPEED (FPHR) :
1200
915
12103.0
12100.0
10568.0
12068.0
1800.0
7-AUG-97
8-AUG-97
TOOL STRING (TOP TO BOTTOM)
VENDOR TOOL CODE TOOL TYPE
PEX PLATFORM EXPRESS
AIT ARRAY INDUCTION TOOL
$
TOOL NUMBER
HILTB -DTB
AIT-H
BOREHOLE AND CASING DATA
OPEN HOLE BIT SIZE (IN):
DRILLERS CASING DEPTH (FT) :
LOGGERS CASING DEPTH (FT) :
6.000
10561.0
10568.0
BOREHOLE CONDITIONS
MUD TYPE:
MUD DENSITY (LB/G):
MUD VISCOSITY (S) :
MUD PH:
FLUID LOSS (C3):
MAXIMUM RECORDED TEMPERATURE (DEGF) :
RESISTIVITY (OHMS) AT TEMPERATURE (DEGF) :
MUD AT MEASURED TEMPERATURE (MT):
MUD AT BOTTOM HOLE TEMPERATURE (BHT):
MUD FILTRATE AT (MT):
MUD FILTRATE AT (BHT) :
MUD CAKE AT (MT):
MUD CAKE AT (BHT):
QUIKDRILN-N
8.70
48.0
9.0
190.0
O. 308 65.0
O. 308 52.0
O. 392 65.0
NEUTRON TOOL
TOOL TYPE (EPITHERMAL OR THERMAL):
MATRIX:
MATRIX DENSITY:
HOLE CORRECTION (IN):
THERMAL
SANDSTONE
2.65
6. 000
TOOL STANDOFF (IN) '.
0.1
ALL TOOLS RUN IN COMBINATION & CONVEYED
BY DRILL PIPE.
THREE .5" STANDOFFS RUN ON INDUCTION & FOUR
.5" STANDOFFS RUN ON SONIC. TWO TOOL TURNERS
RUN ON PEX TO ORIENT NUC TOOLS PAD-SIDE-DOWN
SANDSTONE MATRIX.
DEPTH OFFSET OF +6.5; MADE TO ALL LOGS BY CLIENT
REQUEST TO MATCH MWD.
TEMPERATURE TAKEN FROM PLATFORM EXPRESS & AMS
BOREHOLE TEMPERATURE SIGNALS.
POOR SONIC CASING CHECK (57 us/f).
INCLUDED A TRANSIT TIME LQC PASS WITH SONIC LOG.
898 ' 6~ £I~' O£~I~f ~6£
S~W'OW ~I¥'06~IV 6~'0~ £I~'09~TV
9~'~ £I¥'O[~TV 00~'960~
0000000000 89 ~ ~ r 8 0 O0 000 O0 989~0~H0 ~IV 06d-V
0000000000 89 ~ ~ ~ 8 0 O0 000 O0 989~0~I414H0 ~IV 09d-V
0000000000 89 ~ ~ r 8 0 O0 000 O0 989~Or~lHO £IV O~S-V
0000000000 89 ~ T r 8 0 O0 000 O0 989~OrI4F/lHO £IV
0000000000 89 ~ ~ r 8 0 O0 000 O0 989~OrlCP~IO ~IV Or~f
0000000000 89 ~ T r 8 0 O0 000 O0 989~0r £~
(XWH) ZCOD A~ dI4VS gWIIN GO~ SSV~ID ~Wi~L DO~ # N~OHO CI
SS~DONJ Hd~N ~ZIS WWiiN gWIIN HqIW IdV IdV IdV IWV ~DIAHHS £INO AH~E WI4VN
I 99 0
r 99 9r
89 99 SI
0 99
~ 99
· ~ S9 6
g~'O 89 8
99
££ 9
99
~ 99
0 99
0 99
..............................
~LOTVA ~GOD NdSH ~t~L
..............................
~ OHOD~HNOI~VDI~ID~dS £VIPHO~ ¥£V0 ~
g£: £~ £66r-DI]V-EU
ia;UaD ~uT;ndmoD e~fserV 3~6:raqurnrUmS
LIS Tape Verification Listing
Schlumberger Alaska Computing Center
22-AUG-1997 13:35
PAGE
26
DEPT. 11376. 250 AFIO .AIT
AF60 .AIT 74.193 AF90 .AIT
10. 916 AF20.AIT
82. 870
20.149 AF30.AIT
32. 605
** END OF DATA **
**** FILE TRAILER ****
FILE NAPIE : EDIT .008
SERVICE : FLIC
VERSION : O01CO1
DATE : 97/08/22
MAX REC SIZE : 1024
FILE TYPE : LO
LAST FILE :
**** FILE HEADER ****
FILE NAME : EDIT .009
SERVICE : FLIC
VERSION : O01CO1
DATE : 97/08/22
MAX REC SIZE : 1024
FILE TYPE : LO
LAST FILE :
RUN NUM~ER:
TOOL STRING NUM~ER:
PASS NUMBER:
DEPTH INC~:
FILE SUMmarY
FILE HEADER
FILE~ER 9
RAW OPEN HOLE REPEAT PASSES
Curves and log header data for each pass, tool string, and run in separate files.
1
1
2
0.1667
VENDOR TOOL CODE START DEPTH STOP DEPTH
AIT 12096.5 11376.0
BHC 12096.5 11376.0
PEX 12096.5 11376.0
$
LOG HEADER DATA
DATE LOGGED:
SOFTWARE VERSION:
TI~E CIRCULATION ENDED:
TIME LOGGER ON BOTTOM:
TDDRILLER (FT):
TDLOGGER(FT):
8-AUG-97
8C0-609
1200 7-AUG-97
915 8-AUG-97
12103.0
12100.0
LIS Tape Verification Listing
Schlumberger Alaska Computing Center
22-AUG-1997 13 '.35
PAGE:
27
TOP LOG INTERVAL (FT) :
BOTTOM LOG INTERVAL (FT) :
LOGGING SPEED (FPHR) :
10568.0
12068.0
1800.0
TOOL STRING (TOP TO BOTTOM)
VENDOR TOOL CODE TOOL TYPE
PEX PLATFORM EXPRESS
AIT ARRAY INDUCTION TOOL
$
TOOL NUMBER
HILTB -DTB
AIT-H
BOREHOLE AND CASING DATA
OPEN HOLE BIT SIZE (IN):
DRILLERS CASING DEPTH (FT):
LOGGERS CASING DEPTH (FT):
6. 000
10561.0
10568.0
BOREHOLE CONDITIONS
MUD TYPE:
MUD DENSITY (LB/G):
MUD VISCOSITY (S) :
MUD PH:
FLUID LOSS (C3):
MAXIMUM RECORDED TEMPERATURE (DEGF):
RESISTIVITY (OH~M) AT TEMPERATURE (DEGF) :
MUD AT MEASURED TEMPERATURE (MT):
MUD AT BOTTOM HOLE TEMPERATURE (BHT) :
MUD FILTRATE AT (MT):
MUD FILTRATE AT (BHT) :
MUD CAKE AT (MT):
MUD CAKE AT (BHT):
QUIKDRILN-N
8.70
48.0
9.0
190.0
O. 308 65.0
0.308 52.0
O. 392 65.0
NEUTRON TOOL
TOOL TYPE (EPITHERMAL OR THERMAL):
MATRIX:
MATRIX DENSITY:
HOLE CORRECTION (IN):
THERMAL
SANDSTONE
2.65
6. 000
TOOL STANDOFF (IN):
0.1
REMARKS:
ALL TOOLS RUN IN COMBINATION & CONVEYED
BY DRILL PIPE.
THREE .5" STANDOFFS RUN ON INDUCTION & FOUR
.5" STANDOFFS RUN ON SONIC. TWO TOOL TURNERS
RUN ON PEX TO ORIENT NUC TOOLS PAD-SIDE-DOWN
SANDSTONE MATRIX.
DEPTH OFFSET OF +6.5; MADE TO ALL LOGS BY CLIENT
REQUEST TO MATCH MWD.
TEMPERATURE TAKEN FROM PLATFORM EXPRESS & AMS
BOREHOLE TEMPERATURE SIGNALS.
POOR SONIC CASING CHECK (57 us/f).
INCLUDED A TRANSIT TIME LQC PASS WITH SONIC LOG.
ACCELEROMETER NOT CALIBRATED BEFORE JOB AND WAS
NOT USED FOR SPEED CORRECTION.
THIS IS THE RAW (OPEN HOLE) REPEAT PASS PEX/BHC/AIT
DATA AT O. 1667' SAMPLE RATE.
LIS Tape Verification Listing
Schlumberger Alaska Computing Center
22-AUG-1997 13:35
PAGE:
28
$
LIS FORMAT DATA
DATA FORMAT SPECIFICATION RECORD **
** SET TYPE - 64EB **
TYPE REPR CODE VALUE
1 66 0
2 66 0
3 73 80
4 66 1
5 66
6 73
7 65
8 68 0.166
9 65 FT
11 66 12
12 68
13 66 0
14 65 FT
15 66 68
16 66 1
0 66 1
** SETTYPE - CHAN **
NA~E SERV UNIT SERVICE API API API API FILE NUMB NUMB SIZE REPR PROCESS
ID ORDER # LOG TYPE CLASS MOD NUMB SAMP ELEM CODE (HEX)
DEPT FT 1022686 O0 000 O0 0 9 1 1 4 68 0000000000
RHOZ PEX G/C3 1022686 O0 000 O0 0 9 1 1 4 68 0000000000
HDRA PEX G/C3 1022686 O0 000 O0 0 9 1 1 4 68 0000000000
PEFZ PEX 1022686 O0 000 O0 0 9 1 1 4 68 0000000000
DPHZ PEX PU 1022686 O0 000 O0 0 9 1 1 4 68 0000000000
HMIN PEX 0H~41022686 O0 000 O0 0 9 1 1 4 68 0000000000
H~NO PEX 0H~41022686 00 000 O0 0 9 1 1 4 68 0000000000
RXOZ PEX OH~M1022686 O0 000 O0 0 9 1 1 4 68 0000000000
RX08 PEX Otff4M1022686 O0 000 O0 0 9 1 1 4 68 0000000000
HCNT PEX CPS 1022686 O0 000 O0 0 9 1 1 4 68 0000000000
HCFT PEX CPS 1022686 O0 000 O0 0 9 1 1 4 68 0000000000
HGR PEX GAPI 1022686 O0 000 O0 0 9 1 1 4 68 0000000000
RHFT PEX CPS 1022686 O0 000 O0 0 9 1 1 4 68 0000000000
RPZNTPEX CPS 1022686 O0 000 O0 0 9 1 1 4 68 0000000000
HTNP PEX PU 1022686 O0 000 O0 0 9 1 1 4 68 0000000000
PZNPOPEX PU 1022686 O0 000 O0 0 9 1 1 4 68 0000000000
TT1 BHC US 1022686 O0 000 O0 0 9 1 1 4 68 0000000000
TT2 BHC US 1022686 O0 000 O0 0 9 1 1 4 68 0000000000
TT3 BHC US 1022686 O0 000 O0 0 9 1 1 4 68 0000000000
LIS Tape Verification Listing
Schlumberger Alaska Computing Center
22-AUG-1997 13 '.35
PAGE:
29
NA~E SERVUNIT SERVICE API API API API FILE NUMB NUMB SIZE REPR PROCESS
ID ORDER # LOG TYPE CLASS MOD NUMB SAMP ELEM CODE (HEX)
TT4 BHC US 1022686 O0 000 O0 0 9 1 1 4 68 0000000000
** DATA **
DEPT. 12096.500 RHOZ.PEX -999.250 HDRA.PEX -999.250 PEFZ.PEX -999.250
DPHZ.PEX 60721.211 P~4IN. PEX 0.580 H~flVO. P~ 0.915 RXOZ.PEX 10.561
RXO8.PEX 10.569 HCNT. PEX 3594.058 HCFT. PEX 1897.951 HGR.PEX 125.794
RHFT. PEX 1735.560 RHNT. P~ 3506.207 HTNP. PEX 19.605 HNPO.PEX 19.392
TT1.BHC 468.000 TT2.BHC 322.400 TT3.BHC 454.400 TT4.BHC 310.800
DEPT. 11376.334 RHOZ.PEX 2.239 HDRA.PEX 0.023 PEFZ.PEX 2.884
DPHZ.PEX 24.939 HMIN. PEX 2.139 HFiNO. PEX 2.172 RXOZ.PEX 6.160
RXOS.PEX 7.177 HCNT. PEX 3665.581 HCFT. PEX 1669.099 HGR.PEX 73.550
RHFT.PEX 1768.962 ~.PEX 3785.507 HTNP. PEX 25.566 HNPO.PEX 25.994
TT1.BHC 523.600 TT2.BHC 356.800 TT3.BHC 523.600 TT4.BHC 352.400
** END OF DATA **
**** FILE TRAILER ****
FILE NAME : EDIT .009
SERVICE : FLIC
VERSION : O01CO1
DATE : 97/08/22
MAX REC SIZE : 1024
FILE TYPE : LO
LAST FILE
**** FILE HEADER ****
FILE NA~E : EDIT .010
SERVICE : FLIC
VERSION : O01CO1
DATE : 97/08/22
MAX REC SIZE : 1024
FILE TYPE : LO
LAST FILE :
FILE HEADER
FILE iVOI~ER 10
RAW OPEN HOLEREPEAT PASSES
Curves and log header data for each pass, tool string, and run in separate files.
RUN NUlVi~ER: 1
TOOL STRING NUMBER: 1
LIS Tape Verification Listing
Schlumberger Alaska Computing Center
22-AUG-1997 13:35
PAGE
3O
PASS NUMBER: 2
DEPTH INCREmENT: 0.0833
FILE S~Y
VENDOR TOOL CODE START DEPTH STOP DEPTH
AIT 12096.5 11376.0
BHC 12096.5 11376.0
PEX 12096.5 11376.0
$
LOG HEADER DATA
DATE LOGGED:
SOFTWARE VERSION:
TIME CIRCULATION ENDED:
TIME LOGGER ON BOTTOM:
TD DRILLER (FT) :
TD LOGGER (FT) :
TOP LOG INTERVAL (FT):
BOTTOM LOG INTERVAL (FT) :
LOGGING SPEED (FPHR) :
TOOL STRING (TOP TO BOTTOM)
VENDOR TOOL CODE TOOL TYPE
PEX PLATFORM EXPRESS
AIT ARRAY INDUCTION TOOL
$
BOREHOLE AND CASING DATA
OPEN HOLE BIT SIZE (IN) '.
DRILLERS CASING DEPTH (FT):
LO~GERS CASING DEPTH (FT) :
BOREHOLE CONDITIONS
MUD TYPE:
MUD DENSITY (LB/G):
MUD VISCOSITY (S) :
MUD PH:
FLUID LOSS (C3):
MAXIMUM RECORDED TEMPERATURE (DEGF):
RESISTIVITY (OH~M) AT TEMPERATURE (DEGF):
MUD AT MEASURED TEMPERATURE (MT):
MUD AT BOTTOM HOLE TEMPERATURE (BHT):
MUD FILTRATE AT (MT):
MUD FILTRATE AT (BHT) :
MUD CAKE AT (MT):
MUD CAKE AT (BHT) :
NEUTRON TOOL
TOOL TYPE (EPITHERMAL OR THERMAL):
MATRIX:
MATRIX DENSITY:
HOLE CORRECTION (IN):
8-AUG-97
8C0-609
1200 7-AUG-97
915 8-AUG-97
12103.0
12100.0
10568.0
12068.0
1800.0
TOOL NUMBER
HILTB-DTB
AIT-H
6. 000
10561.0
10568.0
QUIKDRILN-N
8.70
48.0
9.0
190.0
O. 308 65.0
0.308 52.0
O. 392 65.0
THERMAL
SANDSTONE
2.65
6. 000
LIS Tape Verification Listing
Schlumberger Alaska Computing Center
22-AUG-1997 13:35
PAGE:
31
TOOL STANDOFF (IN): O. 1
REMARKS: ALL TOOLS RUN IN COMBINATION & CONVEYED
BY DRILL PIPE.
THREE .5" STANDOFFS RUN ON INDUCTION & FOUR
.5" STANDOFFS RUN ON SONIC. TWO TOOL TURNERS
RUN ON PEX TO ORIENT NUC TOOLS PAD-SIDE-DOWN
SANDSTONE MATRIX.
DEPTH OFFSET OF +6.5; MADE TO ALL LOGS BY CLIENT
REQUEST TO MATCH MWD.
TEMPERATURE TAKEN FROM PLATFORM EXPRESS & AMS
BOREHOLE TEMPERATURE SIGNALS.
POOR SONIC CASING CHECK (57 us/f).
INCLUDED A TRANSIT TIME LQC PASS WITH SONIC LOG.
ACCELEROMETER NOT CALIBRATED BEFORE JOB AND WAS
NOT USED FOR SPEED CORRECTION.
THIS IS THE RAW (OPEN HOLE) REPEAT PASS PEX/BHC/AIT
DATA AT 0.0833' SAMPLE RATE.
$
LIS FORMAT DATA
** DATA FORMAT SPECIFICATION RECORD **
** SET TYPE- 64EB **
TYPE REPR CODE VALUE
1 66 0
2 66 0
3 73 8
4 66 1
5 66
6 73
7 65
8 68 0.083
9 65 FT
11 66 128
12 68
13 66 0
14 65 FT
15 66 68
16 66 1
0 66 1
LIS Tape Verification Listing
Schlumberger Alaska Computing Center
22-AUG-1997 13:35
PAGE:
32
** SET TYPE - CHAN **
NAFiE SERV UNIT SERVICE API API API API FILE NUMB NUMB SIZE REPR PROCESS
ID ORDER # LOG TYPE CLASS MOD NUMB SAMP ELEM CODE (HEX)
DEPT FT 1022686 O0 000 O0 0 10 1 1 4 68 0000000000
HCAL PEX IN 1022686 O0 000 O0 0 10 1 1 4 68 0000000000
** DATA **
DEPT. 12096.500 HCAL.PEX 5.854
DEPT. 11376.084 HCAL.PEX 5.915
** END OF DATA **
**** FILE TRAILER ****
FILE NAME : EDIT .010
SERVICE · FLIC
VERSION : O01CO1
DATE : 97/08/22
MAX REC SIZE : 1024
FILE TYPE : LO
LAST FILE :
**** FILE HEADER ****
FILE NAME : EDIT .011
SERVICE : FLIC
VERSION : O01CO1
DATE : 97/08/22
MAX REC SIZE : 1024
FILE TYPE : LO
LAST FILE :
FILE HEADER
FILE NUMBER 11
RAW CASED HOLE MAIN PASS
Curves and log header data for open hole logs run into casing.
PASS NU~BER: 1
DEPTH INCREMENT: 0.5000
FILE SUFk~ARY
VENDOR TOOL CODE START DEPTH STOP DEPTH
PEX 10568.0 10346.0
$
LIS Tape Verification Listing
Schlumberger Alaska Computing Center
22-AUG-1997 13:35
PAGE:
33
LOG HEADER DATA
DATE LOGGED:
SOFTWARE VERSION:
TIME CIRCULATION ENDED:
TIME LOGGER ON BOTTOM:
TD DRILLER (FT) :
TD LOGGER (FT) :
TOP LOG INTERVAL (FT) :
BOTTOM LOG INTERVAL (FT) :
LOGGING SPEED (FPHR) :
TOOL STRING (TOP TO BOTTOM)
VENDOR TOOL CODE TOOL TYPE
PEX P~TFORMEXPRESS
AIT ARRAY INDUCTION TOOL
$
BOREHOLE AND CASING DATA
OPEN HOLE BIT SIZE (IN):
DRILLERS CASING DEPTH (FT) :
LOGGERS CASING DEPTH (FT) :
BOREHOLE CONDITIONS
MUD TYPE:
MUD DENSITY (LB/G):
MUD VISCOSITY (S):
MUD PH:
FLUID LOSS (C3):
MAXIMUM RECORDED TEMPERATURE (DEGF)
RESISTIVITY (OH~M) AT TEMPERATURE (DEGF)
MUD AT MEASURED TEMPERATURE (MT)
MUD AT BOTTOM HOLE TEMPERATURE (BHT)
MUD FILTRATE AT (MT):
MUD FILTRATE AT (BHT) :
MUD CAKE AT (MT):
MUD CAKE AT (BHT):
NEUTRON TOOL
TOOL TYPE (EPITHERMAL OR THERMAL):
MATRIX:
MATRIX DENSITY:
HOLE CORRECTION (IN):
TOOL STANDOFF (IN):
8-AUG-97
8C0-609
1200 7-AUG-97
915 8-AUG-97
12103.0
12100.0
10568.0
12068.0
1800.0
TOOL NUMBER
HILTB -DTB
AIT-H
6. 000
10561.0
10568.0
QUIKDRILN-N
8.70
48.0
9.0
190.0
O. 308 65.0
0.308 52.0
O. 392 65.0
THERMAL
SANDSTONE
2.65
6. 000
0.1
ALL TOOLS RUN IN COMBINATION & CONVEYED
BY DRILL PIPE.
THREE .5" STANDOFFS RUN ON INDUCTION & FOUR
.5" STANDOFFS RUN ON SONIC. TWO TOOL TURNERS
RUN ON PEX TO ORIENT NUC TOOLS PAD-SIDE-DOWN
SANDSTONE MATRIX.
DEPTH OFFSET OF +6.5; MADE TO ALL LOGS BY CLIENT
REQUEST TO MATCHMWD.
LIS Tape Verification Listing
Schlumberger Alaska Computing Center
22-AUG-1997 13:35
PAGE:
34
TEMPERATURE TAKEN FROM PLATFORM EXPRESS & AMS
BOREHOLE TEMPERATURE SIGNALS.
POOR SONIC CASING CHECK (57 us/f).
INCLUDED A TRANSIT TIME LQC PASS WITH SONIC LOG.
ACCELERO~iETER NOT CALIBRATED BEFORE JOB AND WAS
NOT USED FOR SPEED CORRECTION.
THIS IS THE RAW (CASED HOLE) MAIN PASS PEX
DATA AT 0.5' SAMPLE RATE.
$
LIS FORMAT DATA
** DATA FORMAT SPECIFICATION RECORD **
** SET TYPE- 64EB **
TYPE REPR CODE VALUE
1 66 0
2 66 0
3 73 52
4 66 1
5 66
6 73
7 65
8 68 O. 5
9 65 FT
11 66 19
12 68
13 66 0
14 65 FT
15 66 68
16 66 1
0 66 1
** SET TYPE - CHAN **
NAME SERVUNIT SERVICE API API API API FILE NUMB NUMB SIZE REPR PROCESS
ID ORDER # LOG TYPE CLASS MOD NUMB SAMP ELEM CODE (HEX)
DEPT FT 1022686 O0 000 O0 0 11 1 1 4 68 0000000000
TENS AIT LB 1022686 O0 000 O0 0 11 1 1 4 68 0000000000
HTEN AIT LB 1022686 O0 000 O0 0 11 1 1 4 68 0000000000
GR AIT GAPI 1022686 O0 000 O0 0 11 1 1 4 68 0000000000
CNTC PEX CPS 1022686 O0 000 O0 0 11 1 1 4 68 0000000000
CFTC PEX CPS 1022686 O0 000 O0 0 11 1 1 4 68 0000000000
RCFT PEX CPS 1022686 O0 000 O0 0 11 1 1 4 68 0000000000
RCNT PEX CPS 1022686 O0 000 O0 0 11 1 1 4 68 0000000000
TI~RA PEX 1022686 O0 000 O0 0 11 1 1 4 68 0000000000
RTNR PEX 1022686 O0 000 O0 0 11 1 1 4 68 0000000000
NPOR PEX PU 1022686 O0 000 O0 0 11 1 1 4 68 0000000000
LIS Tape Verification Listing
Schlumberger Alaska Computing Center
22-AUG-1997 13:35
PAGE:
35
NAME SERV UNIT SERVICE API API API API FILE NUMB NUMB SIZE REPR PROCESS
ID ORDER # LOG TYPE CLASS MOD NUMB SAMP ELEM CODE (HEX)
NPHI PEX PU 1022686 O0 000 O0 0 11 1 1 4 68 0000000000
TNPH PEX PU 1022686 O0 000 O0 0 11 1 1 4 68 0000000000
** DATA **
DEPT. 10568.000 TENS.AIT 1520.000 HTEN. AIT 754.153 GR.AIT
CNTC. PEX 3374.077 CFTC.PEX 1582.891 RCFT. PEX 1457.057 RCNT. PEX
TNRA.PEX 2.165 RTNR.PEX 2.244 NPOR.PEX 22.367 NPHI.PEX
T1VPH. PEX 23.001
DEPT. 10346.500 TENS.AIT 291.000 HTEN. AIT 925.373 GR.AIT
CNTC.PEX 1567.344 CFTC.PEX 447.352 RCFT. PEX 384.377 RCNT. PEX
TNRA.PEX 3.400 RTIVR.PEX 3.918 NPOR.PEX 41.725 NPHI.PEX
TNPH.PEX 44.498
368.667
3333.454
23.649
69.504
1404.505
44.171
** END OF DATA **
**** FILE TRAILER ****
FILE NAME : EDIT .011
SERVICE : FLIC
VERSION : O01CO1
DATE : 97/08/22
MAX REC SIZE : 1024
FILE TYPE : LO
LAST FILE :
**** FILE HEADER ****
FILE NAME : EDIT .012
SERVICE : FLIC
VERSION : O01CO1
DATE : 97/08/22
MAX REC SIZE : 1024
FILE TYPE : LO
LAST FILE :
FILE HEADER
FILE NUM~ER 12
RAW CASED HOLEMAIN PASS
Curves and log header data for open hole logs run into casing.
PASS ~ER: 1
DEPTH INCREFZENT: 0.1667
LIS Tape Verification Listing
Schlumberger Alaska Computing Center
22-AUG-1997 13:35
PAGE:
36
· FILE SUBmlARY
VENDOR TOOL CODE START DEPTH
PEX
LOG HEADER DATA
DATE LOGGED ..
10568.0
SOFTWARE VERSION:
TIME CIRCULATION ENDED:
TIME LOGGER ON BOTTOM:
TD DRILLER (FT) '.
TD LOGGER (FT) :
TOP LOG INTERVAL (FT):
BOTTOM LOG INTERVAL (FT) :
LOGGING SPEED (FPHR) :
STOP DEPTH
10346.0
TOOL STRING (TOP TO BOTTOM)
VENDOR TOOL CODE TOOL TYPE
PEX PLATFORM EXPRESS
AIT ARRAY INDUCTION TOOL
$
BOREHOLE AND CASING DATA
OPEN HOLE BIT SIZE (IN):
DRILLERS CASING DEPTH (FT) :
LOGGERS CASING DEPTH (FT) :
BOREHOLE CONDITIONS
MUD TYPE:
MUD DENSITY (LB/G):
MUD VISCOSITY (S) :
MUD PH:
FLUID LOSS (C3):
MAXIMUM RECORDED TEMPERATURE (DEGF) :
RESISTIVITY (oIqMM) AT TEMPERATURE (DEGF) :
MUD AT RiEAStrRED TEMPERATURE (MT):
MUD AT BOTTOM HOLE TEMPERATURE (BHT):
MUD FILTRATE AT (MT):
MUD FILTRATE AT (BHT) :
MUD CAKE AT (MT):
MUD CAKE AT (BHT) :
NEUTRON TOOL
TOOL TYPE (EPITHERMAL OR THERMAL):
MATRIX:
MATRIX DENSITY:
HOLE CORRECTION (IN):
TOOL STANDOFF (IN):
8-AUG-97
8C0-609
1200
915
12103.0
12100.0
10568.0
12068.0
1800.0
TOOL NUMBER
HILTB-DTB
AIT-H
6. 000
10561.0
10568.0
QUIKDRILN-N
8.70
48.0
9.0
190.0
0.308
0.308
O. 392
THERMAL
SANDSTONE
2.65
6. 000
0.1
ALL TOOLS RUN IN COMBINATION & CONVEYED
BY DRILL PIPE.
THREE .5" STANDOFFS RUN ON INDUCTION & FOUR
7-AUG-97
8-AUG-97
65.0
52. 0
65.0
LIS Tape Verification Listing
Schlumberger Alaska Computing Center
22-AUG-1997 13:35
PAGE:
37
.5" STANDOFFS RUN ON SONIC. TWO TOOL TURNERS
RUN ON PEX TO ORIENT NUC TOOLS PAD-SIDE-DOWN
SANDSTONE MATRIX.
DEPTH OFFSET OF +6.5; MADE TO ALL LOGS BY CLIENT
REQUEST TO MATCH MWD.
TEMPERATURE TAFuEN FROM PLATFORM EXPRESS & AMS
BOREHOLE TEMPERATURE SIGNALS.
POOR SONIC CASING CHECK (57 us/f).
INCLUDED A TRANSIT TIME LQC PASS WITH SONIC LOG.
ACCELEROMETER NOT CALIBRATED BEFORE JOB AND WAS
NOT USED FOR SPEED CORRECTION.
THIS IS THE RAW (CASED HOLE) MAIN PASS PEX
DATA AT O. 1667 ' SAMPLE RATE.
$
LIS FORMAT DATA
** DATA FORMAT SPECIFICATION RECORD * *
** SET TYPE - 64EB **
TYPE REPR CODE VALUE
1 66 0
2 66 0
3 73 32
4 66 1
5 66
6 73
7 65
8 68 O. 166
9 65 FT
11 66 32
12 68
13 66 0
14 65 FT
15 66 68
16 66 1
0 66 1
** SET TYPE - CHAN **
NAME SERV UNIT SERVICE API API API API FILE NUMB NUMB SIZE REPR PROCESS
ID ORDER # LOG TYPE CLASS MOD~ SAMP ELEM CODE (HEX)
DEPT FT 1022686 O0 000 O0 0 12 1 1 4 68 0000000000
HClgT PEX CPS 1022686 O0 000 O0 0 12 1 1 4 68 0000000000
HCFT PEX CPS 1022686 O0 000 O0 0 12 1 1 4 68 0000000000
HGR PEX GAPI 1022686 O0 000 O0 0 12 1 1 4 68 0000000000
RHFT PEX CPS 1022686 O0 000 O0 0 12 1 1 4 68 0000000000
RPZNT PEX CPS 1022686 O0 000 O0 0 12 1 1 4 68 0000000000
LIS Tape Verification Listing
Schlumberger Alaska Computing Center
22-AUG-1997 13:35
PAGE:
38
NAME SERV UNIT SERVICE API API API API FILE NUMB NUMB SIZE REPR PROCESS
ID ORDER # LOG TYPE CLASS MOD NUM~ SAMP ELEM CODE (HEX)
HTNP PEX PU 1022686 O0 000 O0 0 12 1 1 4 68 0000000000
t{NPO PEX PU 1022686 O0 000 O0 0 12 1 1 4 68 0000000000
** DATA
DEPT. 10568. 000 HCNT. PEX 3372. 898 HCFT. PEX 1582. 987 HGR. PEX
RHFT. PEX 1438. 297 R3{NT. PEX 3462. 264 HTNP. PEX 22. 988 HNPO. PEX
DEPT. 10346. 834 HCNT. PEX 1561 . 593 HCFT. PEX 451 . 458 HGR. PEX
RHFT.PEX 371.594 RHNT.PE~ 1456. 425 HTNP.PEX 43.992 HNPO.PEX
386. 573
21.168
71. 531
42. 358
** END OF DATA **
**** FILE TRAILER ****
FILE NAME : EDIT .012
SERVICE : FLIC
VERSION · O01CO1
DATE : 97/08/22
MAX REC SIZE : 1024
FILE TYPE : LO
LAST FILE :
**** TAPE TRAILER ****
SERVICE NAME : EDIT
DATE : 97/08/22
ORIGIN : FLIC
TAPE NAM~ : 97369
CONTINUATION # : 1
PREVIOUS TAPE :
COMMENT : ARCO ALASKA INC., DS 7-28A, PRUDHOE BAY, API #50-029-21770-01
**** REEL TRAILER ****
SERVICE NAME : EDIT
DATE : 97/08/22
ORIGIN '. FLIC
REEL NAME : 97369
CONTINUATION # '.
PREVIOUS REEL :
COI~_2VT : ARCO ALASKA INC., DS 7-28A, PRUDHOE BAY, API #50-029-21770-01
Sperry-Sun Drilling Services
LIS Scan Utility
Wed Sep 24 09:22:07 1997
Reel Header
Service name ............. LISTPE
Date ..................... 97/09/24
Origin ................... STS
Reel Name ................ UNKNOWN
Continuation Number ...... 01
Previous Reel Name ....... UNKNOWN
Comments ................. STS LIS Writing Library. Scientific
Technical Services
Tape Header
Service name ............. LISTPE
Date ..................... 97/09/24
Origin ................... STS
Tape Name ................ UNKNOWN
Continuation Number ...... 01
Previous Tape Name ....... UNKNOWN
Comments ................. STS LIS Writing Library. Scientific
Technical Services
Physical EOF
Comment Record
TAPE HEADER
PRUDHOE BAY UNIT
M~D/~AD LOGS
WELL NAME:
API NUMBER:
OPERATOR:
LOGGING COMPANY:
TAPE CREATION DATE:
JOB DATA
JOB NUMBER:
LOGGING ENGINEER:
OPERATOR WITNESS:
500292Z~?00~
ARCO A~S~, INC.
SPERRY-SUN DRILLING SERVICES
24-SEP-97
MWD RUN 2 MWD RUN 3 MWD RUN 4
AK-MW-70220 AK-MW-70220 AK-MW-70220
NEUBAUER NEUBAUER FRENCH
J. JAYE R. JAYE R. JAYE
JOB NUMBER:
LOGGING ENGINEER:
OPERATOR WITNESS:
SURFACE LOCATION
SECTION:
TOWNSHIP:
RANGE:
FNL:
FSL:
FEL:
MWD RUN 5 MWD RUN 6 MWD RUN 7
AK-MW-70220 AK-MW-70220 AK-MW-70220
CADY CADY CADY
R. BORDES R. BORDES R. BORDES
33
liN
14E
394 --.
339
FWL:
ELEVATION (FT FROM MSL 0)
KELLY BUSHING:
DERRICK FLOOR:
GROUND LEVEL:
WELL CASING RECORD
53.20
51.80
24.10
OPEN HOLE CASING DRILLERS
BIT SIZE (IN) SIZE (IN) DEPTH (FT)
1ST STRING
2ND STRING 9.625 9826.0
3RD STRING 8.500 7.000 10561.0
PRODUCTION STRING 6.000 14392.0
REMARKS:
1. ALL DEPTHS ARE MEASURED DEPTHS (MD) UNLESS OTHERWISE
NOTED.
2. MWD RUN 1 IS DIRECTIONAL ONLY TO SET THE WHIPSTOCK
AND NOT PRESENTED.
3. MWD RUNS 2 THROUGH 7 ARE DIRECTIONAL WITH GAMMA RAY
(NGP) UTILIZING
SCINTILLATION DETECTOR.
4. MWD RUNS 4 AND 5 INCLUDED A FIELD TEST OF A RECORDED
SLIMHOLE STABILIZED
LITHO DENSITY (SLD) TOOL.
5. MWD RUNS 1, 2, 3, 4, 5, 6, AND 7 REPRESENT WELL DS
7-28A WITH API#:
50-029-21770-01. THIS WELL REACHED A TOTAL DEPTH (TD) OF
14392'MD, 8991'TVD.
SROP = SMOOTHED RATE OF PENERATION WHILE DRILLING.
SGRD = SMOOTHED GAMMA RAY.
SBDC = SMOOTHED BULK DENSITY-COMPENSATED.
SCOR = SMOOTHED STANDOFF CORRECTION.
SFPE = SMOOTHED FAR DETECTOR ONLY PHOTOELECTRIC
ABSORPTION FACTOR.
$
File Header
Service name ............. STSLIB.001
Service Sub Level Name...
Version Number ........... 1.0.0
Date of Generation ....... 97/09/24
Maximum Physical Record..65535
File Type ................ LO
Previous File Name ....... STSLIB.000
Comment Record
FILE HEADER
FILE NUMBER: 1
EDITED MERGED MWD
Depth shifted and clipped curves; all bit runs merged.
DEPTH INCREMENT: .5000
FILE SUMMARY
PBU TOOL CODE START DEPTH
GR 9973.0
ROP 10037.5
PEF 11287.0
DRHO 11287.0
RHOB 11287.0
STOP DEPTH
14328.0
14396.0
12019.0
12019.0
12019.0
q ISOII
0 I~OII
00~OII
~ 8£0II
0 g£OII
0 ~£OII
~ ~OOII
~ ~860I
0 ~I60I
0 ~880I
0 ~§80I
0 9180I
0 [ISOI
§ L080I
~ ~8L05
§ £LLOI
O'OLLOI
O'~gLOI
O'09LOI
O'§gLOI
~'6~LOI
O'O~LOI
O'L~LOI
g 'ggLOI
~'~ILOI
~'~ILOI
O'OILOI
~'6690I
~'~690I
~'8890I
0'9890I
0'§890I
~'2890I
~'0890I
O'LL90I
0'9L90I
O'IL90I
~'9990I
0'9q90I
~'I~90I
0'9~90I
§'~90I
~'99~0I
0'09~0I
0'8~0I
~'~2~0I
~'~OI
O'~OI
O'6L~OI
0 ~L~OI
0 ~I~OI
~ ~O~OI
0 08£0I
0 L980I
0 0L66
~'S80II
O'~qOII
O'~OII
g'I~OII
O'O~OII
g'~SOII
0 ~OOII
0 ~860I
q PI60I
~ ~880I
0 ~80I
~ 9180I
~ ~ISOI
0 8080I
0 ~8LOI
0 ~LLOI
g OLLOI
g ~gLOI
0 IgLOI
g g~LOI
00~LOI
~ 6£LOI
~'9~LOI
§ L~LOI
g gILOI
0 SILOI
§ OILOI
q OOLOI
g g690I
0 6890I
0 L890I
~ §890I
0'~890I
~'I890I
0'8L90I
q '9L90I
0 '~LgOI
~'L990I
0 'L§90I
§'~§90I
q'9~90I
~'9~90I
g Lg§oI
0 I9~OI
0 6g~OI
~ 9~qOI
g ~gOI
0 £~gOI
~ ~8~0I
g LLPOZ
g'6I~OI
O'LO~OI
0'~8£0I
O'OLCOI
0'~L66
0 28811
0 ~9811
~ 6~811
0 6D81I
~ ££8II
0 L2811
~ 91811
~ 90811
0 §6£I1
0 ~9£11
0 £6911
~ 68911
0 98911
~ 6L911
~ ~L911
0 'I£9II
~'299II
·
~ ~§9II
W'I~9II
§'62911
O'I6WII
§'D8~II
~'89~II
~ 19§11
~ 8~II
0 6D~II
~ O~WII
0 8~WII
~ I~II
0 6IWII
000WII
89~II
80~II
IODII
86~I1
9£~II
~£EII
0££II
991II
8IEII
§I£II
2ICII
OIEII
28211
09111
2~III
£IIII
WIIII
2IIII
OIIII
~60II
§8011
~801I
0 0881I
g 198II
0 LgSll
0 £W811
0 6DSII
0 W£SII
~ 678II
W W~SII
~'2~8II
~ WI8II
0 £08II
0 D6£II
0 29£11
0 96911
0 68911
0 W89II
~'LL9II
§'2L9II
~'699II
0'I99II
0'~§9II
W'O~9II
§'L~9II
0'£6§11
~'~8~TI
W'I£~II
§'~9~II
0'09§11
0'6~II
0'9~II
O'~DWII
~'ID~TI
~'6£§II
~'62~II
~'8I~II
W'IO~II
0'0£~II
0'80~II
W'IO~II
0'86~II
0'££~II
~'DL~II
0'69£11
~'W9£II
0'I2~II
0'8I~II
0 ~I~II
~ IIEII
~ 60~II
0 29111
~ 61111
0'91111
O'~IIII
~'IIIII
W'960II
O'LSOII
O'WSOII
1
1
1
1
1
119
119
119
119
119
119
120
120
120
143
$
1885.5
1889.0
1905.0
1918.5
1930.5
39.5
44.0
56.0
69.5
78 5
91 0
11 0
48 5
54 5
96 0
MERGED DATA SOURCE
PBU TOOL CODE
MWD
MWD
MWD
MWD
MWD
MWD
$
REMARKS:
11887.0
11890.5
11908.0
11920.0
11931.5
11940.5
11943.5
11955.5
11970.0
11975 5
11988 5
12007 5
12045 5
12050 5
14392 0
BIT RUN NO MERGE TOP MERGE BASE
2 10033.0 10561.0
3 10561.0 11368.0
4 11368.0 11679.0
5 11679.0 12103.0
6 12103.0 13241.0
7 13241.0 14392.0
MERGED MAIN PASS.
$
Data Format Specification Record
Data Record Type .................. 0
Data Specification Block Type ..... 0
Logging Direction ................. Down
Optical log depth units ........... Feet
Data Reference Point .............. Undefined
Frame Spacing ..................... 60 .liN
Max frames per record ............. Undefined
Absent value ...................... -999.25
Depth Units .......................
Datum Specification Block sub-type...0
Name Service Order Units Size Nsam Rep Code Offset Channel
DEPT FT 4 1 68 0 1
ROP MWD FT/H 4 1 68 4 2
GR MWD AAPI 4 1 68 8 3
RHOB MWD G/CC 4 1 68 12 4
DRHO MWD G/CC 4 1 68 16 5
PEF MWD BARN 4 1 68 20 6
First
Name Min Max Mean Nsam Reading
DEPT 9973 14396 12184.5 8847 9973
ROP 1.7095 5737.5 72.8821 8718 10037.5
GR 17.6448 681.299 66.0675 8711 9973
RHOB 2.0488 3.3003 2.32285 1465 11287
DRHO -0.127 0.9305 0.0675045 1465 11287
PEF 1.3386 7.3477 2.22442 1465 11287
Last
Reading
14396
14396
14328
12019
12019
12019
First Reading For Entire File .......... 9973
Last Reading For Entire File ........... 14396
File Trailer
Service name ............. STSLIB.001
Service Sub Level Name...
Version Number ........... 1.0.0
Date of Generation ....... 97/09/24
Maximum Physical Record..65535
File Type ................ LO
Next File Name ........... STSLIB.002
Physical EOF
File Header
Service name ............. STSLIB.002
Service Sub Level Name...
Version Number ........... 1.0.0
Date of Generation ....... 97/09/24
Maximum Physical Record..65535
File Type ................ LO
Previous File Name ....... STSLIB.001
Comment Record
FILE HEADER
FILE NUMBER: 2
RAW MWD
Curves and log header data for each bit run in separate files.
BIT RUN NUMBER: 2
DEPTH INCREMENT: .5000
FILE SUMMARY
VENDOR TOOL CODE START DEPTH STOP DEPTH
GR 9970.0 10497.~ '
ROP 10034.5 10560.0
$
# -
LOG HEADER DATA
DATE LOGGED: 31-JUL-97
SOFTWARE
SURFACE SOFTWARE VERSION:
DOWNHOLE SOFTWARE VERSION:
DATA TYPE (MEMORY OR REAL-TIME):
TD DRILLER (FT) :
TOP LOG INTERVAL (FT) :
BOTTOM LOG INTERVAL (FT) :
BIT ROTATING SPEED (RPM):
HOLE INCLINATION (DEG
MINIMUM ~qGLE: 42.8
MAXIMUM ANGLE: 63.2
TOOL STRING (TOP TO BOTTOM)
VENDOR TOOL CODE TOOL TYPE
NGP NATURAL GAMMA PROBE
$
ISC 5.06 / ISC 5.06
DEP 2.042/NGP 5.74
MEMORY
10561.0
10033.0
10561.0
TOOL NUMBER
NGP 223
BOREHOLE AND CASING DATA
OPEN HOLE BIT SIZE (IN):
DRILLER'S CASING DEPTH (FT) :
BOREHOLE CONDITIONS MUD TYPE:
MUD DENSITY (LB/G):
MUD VISCOSITY (S) :
MUD PH:
l~JD CHLORIDES (PPM) :
FLUID LOSS (C3):
RESISTIVITY (OHMM) AT TEMPERATURE (DEGF)
MUD AT MEASURED TEMPERATURE (MT):
MUD AT MAX CIRCULATING TERMPERATURE:
MUD FILTRATE AT MT:
MUD CAKE AT MT:
NEUTRON TOOL
MATRIX:
MATRIX DENSITY:
HOLE CORRECTION (IN):
TOOL STANDOFF (IN) :
EWR FREQUENCY (HZ) :
REMARKS:
$
Data Format Specification Record
Data Record Type .................. 0
Data Specification Block Type ..... 0
Logging Direction ................. Down
Optical log depth units ........... Feet
Data Reference Point .............. Undefined
Frame Spacing ..................... 60 .liN
Max frames per record ............. Undefined
Absent value ...................... -999.25
Depth Units .......................
Datum Specification Block sub-type...0
8.500
8.5
MILLING FLUID
10.50
45.0
8.5
28000
6.0
.000
.000
.000
.000
56.2
.0
Name Service Order Units Size Nsam Rep Code Offset Cha~nel
DEPT FT 4 1 68 0 1
GR MWD 2 AAPI 4 1 68 4 2
ROP MWD 2 FT/H 4 1 68 8 3
First
Name Min Max Mean Nsam Reading
DEPT 9970 10560 10265 1181 9970
GR 58.93 129.54 104.106 1055 9970
ROP 10.96 169.76 37.6028 1052 10034.5
Last
Reading
10560
10497
10560
First Reading For Entire File .......... 9970
Last Reading For Entire File ........... 10560
File Trailer
Service name ............. STSLIB.002
Service Sub Level Name...
Version Number ........... 1.0.0
Date of Generation ....... 97/09/24
Maximum Physical Record..65535
File Type ................ LO
Next File Name ........... STSLIB.003
Physical EOF
File Header
Service name ............. STSLIB.003
Service Sub Level Name...
Version Number ........... 1.0.0
Date of Generation ....... 97/09/24
Maximum Physical Record..65535
File Type ................ LO
Previous File Name ....... STSLIB.002
Comment Record
FILE HEADER
FILE NUMBER: 3
RAW MWD
Curves and log header data for each bit run in separate files.
BIT RUN NUMBER: 3
DEPTH INCREMENT: .5000
FILE SUMMARY
VENDOR TOOL CODE START DEPTH STOP DEPTH
GR 10325.5 11303.0
ROP 10392.0 11370.0
$
LOG HEADER DATA
DATE LOGGED: 04-AUG-97
SOFTWARE
SURFACE SOFTWARE VERSION:
DOWNHOLE SOFTWARE VERSION:
DATA TYPE (MEMORY OR REAL-TIME):
TD DRILLER (PT) :
TOP LOG INTERVAL (PT):
BOTTOM LOG INTERVAL (PT):
BIT ROTATING SPEED (RPM):
HOLE INCLINATION (DEG
MINIMUM ANGLE: 55.7
MAXIMUM ANGLE: 64.5
TOOL STRING (TOP TO BOTTOM)
VENDOR TOOL CODE TOOL TYPE
NGP NATURAL GAMMA PROBE
$
BOREHOLE AND CASING DATA
OPEN HOLE BIT SIZE (IN):
DRILLER'S CASING DEPTH (PT) :
BOREHOLE CONDITIONS
M~gD TYPE:
ISC 5.06 / ISC 5.06
DEP 2.042/NGP 5.74
MEMORY
11368.0
10561.0
11368.0
TOOL NUMBER
NGP 224
6.000
6.0
QUICKDRIL-N
MUD DENSITY (LB/G):
MUD VISCOSITY (S) :
MUD PH:
MUD CHLORIDES (PPM) :
FLUID LOSS (C3) :
RESISTIVITY (OHMM) AT TEMPERATURE (DEGF)
MUD AT MEASURED TEMPERATURE (MT):
MUD AT MAX CIRCULATING TERMPERATURE:
MUD FILTRATE AT MT:
I~UD CAKE AT MT:
NEUTRON TOOL
MATRIX:
MATRIX DENSITY:
HOLE CORRECTION
(IN) :
TOOL STANDOFF (IN) :
EWR FREQUENCY (HZ) :
REMARKS:
$
Data Format Specification Record
Data Record Type .................. 0
Data Specification Block Type ..... 0
Logging Direction ................. Down
Optical log depth units ........... Feet
Data Reference Point .............. Undefined
Frame Spacing ..................... 60 .liN
Max frames per record ............. Undefined
Absent value ...................... -999.25
Depth Units .......................
Datum Specification Block sub-type...0
8.60
48.0
8.9
11500
8.8
.000
.000
.000
.000
.0
Name Service Order Units Size Nsam Rep Code Offset Channel
DEPT FT 4 1 68 0 1
GR MWD 3 AAPI 4 1 68 4 2
ROP MWD 3 FT/H 4 1 68 8 3
·
51.7
FirSt
Name Min Max Mean Nsam Reading
DEPT 10325.5 11370 10847.8 2090 10325.5
GR 18.2657 681.299 70.999 1956 10325.5
ROP 2.0635 777.214 77.1893 1957 10392
Last
Reading
11370
11303
11370
First Reading For Entire File .......... 10325.5
Last Reading For Entire File ........... 11370
File Trailer
Service name ............. STSLIB.003
Service Sub Level Name...
Version Number ........... 1.0.0
Date of Generation ....... 97/09/24
Maximum Physical Record..65535
File Type ................ LO
Next File Name ........... STSLIB.004
Physical EOF
File Header
Service name ............. STSLIB.004
Service Sub Level Name...
Version Number ........... 1.0.0
Date of Generation ....... 97/09/24
Maximu~n Physical Record..65535
File Type ................ LO
Previous File Name ....... STSLIB.003
Comment Record
FILE HEADER
FILE NUMBER: 4
RAW MWD
Curves and log header data for each bit run in separate files.
BIT RUN NUMBER: 4
DEPTH INCREMENT: .5000
FILE SUMMARY
VENDOR TOOL CODE START DEPTH STOP DEPTH
PEF 11286.5 11596.5
DRHO 11286.5 11597.5
RHOB 11286.5 11597.5
GR 11304.5 11615.0
ROP 11372.0 11682.0
$
LOG HEADER DATA
DATE LOGGED: 05-AUG-97
SOFTWARE
SURFACE SOFTWARE VERSION: ISC 5.06 / ISC 5.06
DOWNHOLE SOFTWARE VERSION: DEP 2.042/NGP 5.74
DATA TYPE (MEMORY OR REAL-TIME): MEMORY
TD DRILLER (FT) : 11679.0
TOP LOG INTERVAL (FT) : ' 11368.0
BOTTOM LOG INTERVAL (FT) : 11679.0
BIT ROTATING SPEED (RPM):
HOLE INCLINATION (DEG
MINIMUM ANGLE: 57.2
MA_XIMUM ANGLE: 59.7
TOOL STRING (TOP TO BOTTOM)
VENDOR TOOL CODE TOOL TYPE TOOL NUMBER
NGP NATURAL GAMMA PROBE NGP 184
SLD STABILIZED LITHO DEN
$
BOREHOLE AND CASING DATA
OPEN HOLE BIT SIZE (IN): 6.000
DRILLER'S CASING DEPTH (FT): 6.0
BOREHOLE CONDITIONS
MUD TYPE: QUICKDRIL-N
MUD DENSITY (LB/G): 8.60
MUD VISCOSITY (S): 54.0
MUD FH: 8.7
MUD CHLORIDES (PPM) :
FLUID LOSS (C3):
RESISTIVITY (OHF/~) AT TEMPERATURE (DEGF)
MUD AT MEASURED TEMPERATURE (MT):
MUD AT MAX CIRCULATING TERMPERATURE:
MUD FILTRATE AT MT:
MUD CAKE AT MT:
NEUTRON TOOL
MATRIX:
MATRIX DENSITY:
HOLE CORRECTION
(IN) :
TOOL STANDOFF (IN) :
EWR FREQUENCY (HZ) :
REMARKS:
$
Data Format Specification Record
Data Record Type .................. 0
Data Specification Block Type ..... 0
Logging Direction ................. Down
Optical log depth units ........... Feet
Data Reference Point .............. Undefined
Frame Spacing ..................... 60 .liN
Max frames per record ............. Undefined
Absent value ...................... -999.25
Depth Units .......................
Datum Specification Block sub-type...0
11500
8.2
.000
.000
.000
.000
.0
Name Service Order
DEPT FT 4 1 68
GR MWD 4 AAP I 4 1 68
ROP MWD 4 FT/H 4 1 68
PEF MWD 4 BARN 4 1 68
RHOB MWD 4 G/CC 4 1 68
DRHO MWD 4 G/CC 4 1 68
Units Size Nsam Rep Code Offset Channel
0 1
4 2
8 3
12 4
16 5
20 6
51.1
Name Min Max Mean Nsam
DEPT 11286.5 11682 11484.2 792
GR 17. 6448 106. 524 33. 3359 622
ROP 12. 2078 476. 318 60. 3299 621
PEF 1. 4441 4. 3122 2. 07411 621
RHOB 2.0549 2.8138 2.26181 623
DRHO -0. 079 0. 3771 0. 0504369 623
First
Reading
11286.5
11304.5
11372
11286.5
11286.5
11286.5
Last
Reading
11682
11615
11682
11596.5
11597.5
11597.5
First Reading For Entire File .......... 11286.5
Last Reading For Entire File ........... 11682
File Trailer
Service name ............. STSLIB.004
Service Sub Level Name...
Version Number ........... 1.0.0
Date of Generation ....... 97/09/24
Maximum Physical Record..65535
File Type ................ LO
Next File Name ........... STSLIB.005
Physical EOF
File Header
Service name ............. STSLIB.005
Service Sub Level Name...
Version Number ........... 1.0.0
Date of Generation ....... 97/09/24
Maximum Physical Record..65535
File Type ................ LO
Previous File Name ....... STSLIB.004
Comment Record
FILE HEADER
FILE NUMBER: 5
RAW MWD
Curves and log header data for each bit run in separate files.
BIT RUN NUMBER: 5
DEPTH INCREMENT: .5000
FILE SUMMARY
VENDOR TOOL CODE START DEPTH STOP DEPTH
DRHO 11598.0 12016.0
RHOB 11598.0 12016.0
PEF 11598.5 12016.0
GR 11616.5 12034.5
ROP 11683.5 12102.0
$
LOG HEADER DATA
DATE LOGGED: 07-AUG-97
SOFTWARE
SURFACE SOFTWARE VERSION: ISC 5.06 / ISC 5.06
DOWNHOLE SOFTWARE VERSION: , DEP 2.042/NGP 5.74
DATA TYPE (MEMORY OR REAL-TIME): MEMORY
TD DRILLER (FT): 12103.0
TOP LOG INTERVAL (FT): 11679.0
BOTTOM LOG INTERVAL (FT): 12103.0
BIT ROTATING SPEED (RPM):
HOLE INCLINATION (DEG
MINIMUM ANGLE: 63.1
MAXIMUM ANGLE: 94.7
TOOL STRING (TOP TO BOTTOM)
VENDOR TOOL CODE TOOL TYPE TOOL NUMBER
NGP NATURAL GAMMA PROBE NGP 223
SLD STABILIZED LITHO DEN
$
BOREHOLE AND CASING DATA
OPEN HOLE BIT SIZE (IN): 6.000
DRILLER'S CASING DEPTH (FT) : 6.0
BOREHOLE CONDITIONS
MUD TYPE: QUICKDRIL-N
MUD DENSITY (LB/G) :
MUD VISCOSITY (S):
MUD PH:
MUD CHLORIDES (PPM):
FLUID LOSS (C3) :
RESISTIVITY (OHM/~) AT TEMPERATURE (DEGF)
MUD AT MEASURED TEMPERATURE (MT):
MUD AT MAX CIRCULATING TERMPERATURE:
MUD FILTRATE AT MT:
MUD CAKE AT MT:
NEUTRON TOOL
MATRIX:
MATRIX DENSITY:
HOLE CORRECTION
(IN):
TOOL STANDOFF (IN) :
EWR FREQUENCY (HZ) :
REMARKS:
$
Data Format Specification Record
Data Record Type .................. 0
Data Specification Block Type ..... 0
Logging Direction ................. Down
Optical log-depth units ........... Feet
Data Reference Point .............. Undefined
Frame Spacing ..................... 60 .lin
Max frames per record ............. Undefined
Absent value ...................... -999.25
Depth Units .......................
Datum Specification Block sub-type...0
8.60
54.0
8.7
11500
8.2
.00
.00
.00
.00
.0
Name Service Order Units Size Nsam Rep Code Offset Channel
DEPT FT 4 1 68 0 1
GR MWD 5 AAP I 4 1 68 4 2
ROP MWD 5 FT/H 4 1 68 8 3
PEF MWD 5 BARN 4 1 68 - 12 4
RHOB MWD 5 G/CC 4 1 68 16 5
DRHO MWD 5 G/CC 4 1 68 20 6
51.1
First
Name Min Max Mean Nsam Reading
DEPT 11598 12102 11850 1009 11598
GR 18.8412 220.8 57.5774 837 11616.5
ROP 4.9959 5737.5 99.2308 838 11683.5
PEF 1.3386 7.3477 2.33623 836 11598.5
RHOB 2.0488 3.3003 2.36456 837 11598
DRHO -0.127 0.9305 0.0804496 837 11598
Last
Reading
12102
12034.5
12102
12016
12016
12016
First Reading For Entire File .......... 11598
Last Reading For Entire File ........... 12102
File Trailer
Service name ............. STSLIB.005
Service Sub Level Name...
Version Number ........... 1.0.0
Date of Generation ....... 97/09/24
Maximum Physical Record..65535
File Type ................ LO
Next File Name ........... STSLIB.006
Physical EOF
File Header
Service name ............. STSLIB.006
Service Sub Level Name...
Version Number ........... 1.0.0
Date of Generation ....... 97/09/24
Maximum Physical Record..65535
File Type ................ LO
Previous File Name ....... STSLIB.005
Comment Record
FILE HEADER
FILE NUMBER: 6
RAW MWD
Curves and log header data for each bit run in separate files.
BIT RUN NUMBER: 6
DEPTH INCREMENT: .5000
FILE SUMMARY
VENDOR TOOL CODE START DEPTH STOP DEPTH
GR 11030.0 13175.0
ROP 11094.0 13238.5
$
LOG HEADER DATA
DATE LOGGED: 10-AUG-97
SOFTWARE
SURFACE SOFTWARE VERSION:
DOWNHOLE SOFTWARE VERSION:
DATA TYPE (MEMORY OR REAL-TIME):
TD DRILLER (FT):
TOP LOG INTERVAL (FT):
BOTTOM LOG INTERVAL (FT) :
BIT ROTATING SPEED (RPM):
HOLE INCLINATION (DEG
MINIMUM ANGLE: 87.5
MAXIMUM ANGLE: 94.8
TOOL STRING (TOP TO BOTTOM)
VENDOR TOOL CODE TOOL TYPE
NGP NATURAL GAMMA PROBE
$
BOREHOLE AND CASING DATA
OPEN HOLE BIT SIZE (IN):
DRILLER'S CASING DEPTH (FT) :
BOREHOLE CONDITIONS MUD TYPE:
MUD DENSITY (LB/G):
ISC 5.06 / ISC 5.06
DEP 2.042/NGP 5.74
MEMORY
13241.0
12103.0
13241.0
TOOL NUMBER
NGP 223
6.000
6.0
QUICKDRIL-N
8.80
MUD VISCOSITY (S) :
MUD PH:
MUD CHLORIDES (PPM):
FLUID LOSS (C3):
RESISTIVITY (OHMM)AT TEMPERATURE (DEGF)
MUD AT MEASURED TEMPERATURE (MT):
MUD AT MAX CIRCULATING TERMPERATURE:
MUD FILTRATE AT MT:
MUD CAKE AT MT:
NEUTRON TOOL
MATRIX:
MATRIX DENSITY:
HOLE CORRECTION (IN):
TOOL STANDOFF (IN) :
EWR FREQUENCY (HZ) :
REMARKS:
$
Data Format Specification Record
Data Record Type .................. 0
Data Specification Block Type ..... 0
Logging Direction ................. Down
Optical log depth units ........... Feet
Data Reference Point .............. Undefined
Frame Spacing ..................... 60 .liN
Max frames per record ............. Undefined
Absent value ...................... -999.25
Depth Units .......................
Datum Specification Block sub-type...0
50.0
9.0
11000
7.2
.000
.000
.000
.000
.0
Name Service Order Units Size Nsam Rep Code Offset Channel
DEPT FT 4 1 68 0 1
GR MWD 6 AAP I 4 1 68 4 2
ROP MWD 6 FT/H 4 1 68 8 3
First
Name Min Max Mean Nsam Reading
DEPT 11030 13238.5 12134.2 4418 11030
GR 48.6734 174.695 71.9544 2309 11030
ROP 7.5087 1842.19 80.0288 2310 11094
63.3
Last
Reading
13238.5
13175
13238.5
First Reading For Entire File .......... 11030
Last Reading For Entire File ........... 13238.5
File Trailer
Service name ............. STSLIB.006
Service Sub Level Name...
Version Number ........... 1.0.0
Date of Generation ....... 97/09/24
Maximum Physical Record..65535
File Type ................ LO
Next File Name ........... STSLIB.007
Physical EOF
File Header
Service name ............. STSLIB.007
Service Sub Level Name...
Version Number ........... 1.0.0
Date of Generation ....... 97/09/24
Maximum Physical Record..65535
File Type ................ LO
Previous File Name ....... STSLIB.006
Comment Record
FILE HEADER
FILE NUMBER: 7
RAW MWD
Curves and log header data for each bit run in separate files.
BIT RUN NUMBER: 7
DEPTH INCREMENT: .5000
FILE SUMY~ARY
VENDOR TOOL CODE START DEPTH
GR 13173.0
ROP 13242.5
$
LOG HEADER DATA
DATE LOGGED:
SOFTWARE
SURFACE SOFTWARE VERSION:
DOWNHOLE SOFTWARE VERSION:
DATA TYPE (MEMORY OR REAL-TIME):
TD DRILLER (FT) :
TOP LOG INTERVAL (FT) :
BOTTOM LOG INTERVAL (FT) :
BIT ROTATING SPEED (RPM):
HOLE INCLINATION (DEG
MINIMUM ANGLE:
MAXIMUM ANGLE:
STOP DEPTH
14324.0
14392.0
TOOL STRING (TOP TO BOTTOM)
VENDOR TOOL CODE TOOL TYPE
NGP NATURAL GAMMA PROBE
$
BOREHOLE AND CASING DATA
OPEN HOLE BIT SIZE (IN):
DRILLER'S CASING DEPTH (FT) :
BOREHOLE CONDITIONS MUD TYPE:
MUD DENSITY (LB/G):
MUD VISCOSITY (S) :
MUD PH:
MUD CHLORIDES (PPM) :
FLUID LOSS (C3) :
RESISTIVITY (OHMS4) AT TEMPERATURE (DEGF)
MUD AT MEASURED TEMPERATURE (MT):
MUD AT MAX CIRCULATING TERMPERATURE:
i3-AUG-97
ISC 5.06 / ISC 5.06
DEP 2.042/NGP 5.74
MEMORY
14392.0
13241.0
14392.0
87.0
94.4
TOOL NUMBER
NGP 184
6.000
6.0
QUICKDRIL-N
8.90
51.0
8.9
10500
6.0
.000
.000
70.3
MUD FILTRATE AT MT:
MUD CAKE AT MT:
NEUTRON TOOL
MATRIX:
MATRIX DENSITY:
HOLE CORRECTION
(IN) :
TOOL STANDOFF (IN) :
EWR FREQUENCY (HZ):
REMARKS:
$
Data Format Specification Record
Data Record Type .................. 0
Data Specification Block Type ..... 0
Logging Direction ................. Down
Optical log depth units ........... Feet
Data Reference Point .............. Undefined
Frame Spacing ..................... 60 .liN
Max frames per record ............. Undefined
Absent value ...................... -999.25
Depth Units .......................
Datum Specification Block sub-type...0
.000
.000
.0
Name Service Order Units Size Nsam Rep Code Offset Channel
DEPT FT 4 1 68 0 1
GR MWD 7 AAPI 4 1 68 4 2
ROP MWD 7 FT/H 4 1 68 8 3
Name Min Max Mean Nsam
DEPT 13173 14392 13782.5 2439
GR 25.9053 143.296 53.3547 2303
ROP 1.7095 2650.78 83.3341 2300
First Reading For Entire File .......... 13173
Last Reading For Entire File ........... 14392
First
Reading
13173
13173
13242.5
Last
Reading
14392
14324
14392
File Trailer
Service name ............. STSLIB.007
Service Sub Level Name...
Version Number ........... 1.0.0
Date of Generation ....... 97/09/24
Maximum Physical Record..65535
File Type ................ LO
Next File Name ........... STSLIB.008
Physical EOF
Tape Trailer
Service name ............. LISTPE
Date ..................... 97/09/24
Origin ................... STS
Tape Name ................ UNKNOWN
Continuation Number ...... 01
Next Tape Name ........... UNKNOWN
Comments ................. STS LIS Writing
Technical Services
Library.
Reel Trailer
Service name ............. LISTPE
Date ..................... 97/09/24
Origin ................... STS
Reel Name ................ UNKNOWN
Continuation Number ...... 01
Next Reel Name ........... UNKNOWN
Comments ................. STS LIS Writing Library.
Technical Services
Scientific
Scientific
Physical EOF
Physical EOF
End Of LIS File