HomeMy WebLinkAbout202-235New Plugback Esets
6/24/2024
Well Name API Number PTD
Number
ESet
Number
Date
1E-15AL2 PB1 50-029-20769-70-00 210-015 T38990 6-17-2010
1E-15AL2 PB2 50-029-20769-71-00 210-015 T38991 6-17-2010
1E-15AL2 PB3 50-029-20769-72-00 210-015 T38992 6-17-2010
3N-16A PB1 50-029-21593-70-00 210-049 T38993 7-8-2010
3N-16A PB2 50-029-21593-71-00 210-049 T38994 7-8-2010
3N-16A PB3 50-029-21593-72-00 210-049 T38995 7-8-2010
CD4-27 PB1 50-103-20644-70-00 211-146 T38996 6-14-2012
CD4-27 PB3 50-103-20644-72-00 211-146 T38997 6-14-2012
ODST-46 PB1 50-703-20631-70-00 210-183 T38998 5-10-2011
ODST-46 PB2 50-703-20631-71-00 210-183 T38999 5-10-2011
ODST-46 PB3 50-703-20631-72-00 210-183 T39000 5-10-2011
W-19AL1 PB1 50-029-22006-70-00 202-235 T39001 6-10-2003
W-19AL1 PB2 50-029-22006-71-00 202-235 T39002 6-10-2003
W-WW 19AL1 PB1 50-029-22006-70-00 202-235 T39001 6-10-2003
W-WW 19AL1 PB2 50-029-22006-71-00 202-235 T39002 6-10-2003
•
Robert Tirpack
Engineering Team Leader ~3
BP Exploration (Alaska), Ine, ~ ~~~~~ ~. ,~~,,~ ~ u ;~ ~ ~ a:~ ~Q ~.,"~
r.0. Box 196612
Anchorage, AK 99519-6612
Re: Prudhoe Bay Field, Prudhoe Bay Oil Pool, PBU W-19AL1
Sundry Number: 310-149
Dear Mr. Tirpack:
Enclosed is the approved Application for Sundry Approval relating to the above
referenced well. Please note the conditions of approval set out in the enclosed
form.
As provided in AS 31.05.080, within 20 days after written notice of this
decision, or such further time as the Commission grants for good cause shown,
a person affected by it may file with the Commission an application for
rehearing. A request for rehearing is considered timely if it is received by 4:30
PM on the 23rd day following the date of this letter, or the next working day if
the 23rd day falls on a holiday or weekend. A person may not appeal a
Commission decision to Superior Court unless rehearing has been requested.
Sincerely,
DATED this 2 da of Ma 2010.
e y y,
Daniel T. Seamount, Jr.
Chair
Encl.
STATE OF ALASKA
~~17 /\~/1~ ALAS~IL AND GAS CONSERVATION COMMI~N ~~~
~~~ 5 APPLICATION FOR SUNDRY APPROVAL
~ 20 AAC 25.ZSO ~1AY Q 6 2010sw~~a
1. Type of Request:
~1
^ Abandon ®Plug for Redrill ^ Perforate New Pool ^ Repair Well ^ Change RU
^ Suspend ^ Plug Perforations ^ Perforate ^ Pull Tubing ^ Time Extension
^ Operations Shutdown ^ Re-Enter Suspended Well ^ Stimulate ^ Alter Casing ^ Other
2. Operator Name: 4. Current Well Class: Permit To Drill Number
BP Exploration (Alaska) Inc. ®Development ^ Exploratory 202-235 ~ '
3. Address: ^ Service ^ Stratigraphic • API Number:
P.O. Box 196612, Anchorage, Alaska 99519-6612 50-029-22006-60-00 ~ -
7. If perforating, closest approach in pool(s) opened by this operation to nearest 8. Well Name and Number:
property line where ownership or landownership changes: .e13U W-19AL1 -
Spacing Exception Required? ^ Yes ®No
9. Property Designation: ~ ~~ 10. Field /Pool(s): ,
ADL 028263- Prudhoe Bay Field / Prudhoe Bay Oil Pool
11. PRESENT WELL CONDITION SUMMARY
Total Depth MD (ft): Total Depth TVD (ft): Effective Depth MD (ft): Effective Depth TVD (ft): Plugs (measured): Junk (measured):
12675' - 8953' - 11930' - 8976' - None None
Casin Len Size MD TVD Burst Colla
Structural
Conductor 11 2 1 1 '
Surface 2692' 13-3/8" 2 2' 2 7' 49 2270
Intermediate 1 4 9-5/8" 1046 ' 417' 6 70 476
Production
Liner 627' 7" 10 0 ' - 10 35' 8307' - 768' 7 40 5410
Liner 174' 4-1 /2" 10774' - 1094 ' 646' - 8778' 8430 750
Liner 4' 3-1/2" x 3-3/16" x 2-7/8" '- 1 '
Perforation Depth MD (tt): Perforation Depth TVD (ft): Tubing Size: Tubing Grade: Tubing MD (tt):
11249' - 11930' 8906' - 8976' 4-1/2", 12.6# L-80 10779'
Packers and SSSV Type: 7" x 4-1/2" Baker'S-3' packer Packers and SSSV 10723' / 8607'
MD (ft) and TVD (ft):
12. Attachments: .Well Class after proposed work:
® Description Summary of Proposal ^ BOP Sketch
^ Exploratory ®Development ^ Service
^ Detailed Operations Program
14. Estimated Date for ~ Well Status after proposed work:
Commencing Operations: May 14, 2010 ^ Oil ^ Gas ^ WDSPL ^ GSTOR ^ Abandoned
16. Verbal Approval: Date: ^ WINJ ^ GINJ ^ WAG Plugged ^ SPLUG
Commission Representative: ~~/sPEy r
17. I hereby certify that the foregoing is true and correct to the best of my knowledge. Contact Garret Staudinger 564-4242
Printed Name ,Robert Tirpack Title Engineering Team Leader
Prepared By Name/Number:
Signature`s®';~ ~, _ Phone 564-4166 Date ,S ~ Terrie Hubble, 564-4628
Commission Use Onl
Conditions of approval: Notify Commission so that a representative may witness ./
Sundry Number. ~ O
~
BOP Test ^ Mechanical Integrity Test ^ Location Clearance
^ Plug Integrity 10
~ 3soo PS` Bob sf-
Other.
-* ZJ~(JU ~OSt~ /4 n n ~a.r ~ s ~ CIx'''+~,
Zd
S" ~ A ~
5
~
.
/ L L P~~ ~.ccepf4. ~ 4- Zv AEG Z
Subsequent Form Required: /O ~ _I ~~
APPROVED BY ~ / 2 /
Approved By: COMMISSIONER THE COMMISSION Date /
Forrn 10-403 Revised '(2/2609 Submit In Duplicate
RBDMS MAY 1210 ~ ~ ~ ~ ~,:~ ~ L „~/ .~ 7~0 ~,t'~~~T~
•
by
GP ~
W-19B/BL1 Rig Sidetrack
•
Well Type: Producer
Current Status: W-19A is completed with 4-1/2" liner and W-19AL1 is completed with 3-1/2" x 2-7/8" liner
outside of a window in the 4-1/2" liner. 4-1/2" L-80 tubing is inside 9-5/8" casing with a 7" liner and is
currently shut-in.
Request: Abandon
Reason for Sundry Application:
As part of the rig sidetrack operation, the existing W-19A perforations and W-19AL1 slotted liner will be
permanently abandoned as follows:
W-19A P&A: A cement retainer will be set in the 4-1 /2" liner below the window for the AL1 lateral.
50 bbls of 15.8 ppg Class G cement will be pumped through the cement retainer by means of coil.
The cement will be placed /squeezed into the W-19A lateral and 1 bbls will be laid on top of the
cement retainer. The cement plug will be pressure tested to 2000 psi.
W-19AL1 P&A: 34 bbls of 15.8 ppg Class G cement will be placed in the AL1 lateral by means of
coil. A TOC will be targeted at 10,000' MD.
Reason for Sidetrack:
W-19A and W-19AL1 is shut in due to hi h water cut. In addition, a tubing caliper indicated that the
tubing was generally in poor condition with posse le buckled tubing. This prevents the option of a coil
sidetrack.
Current Status:
W-19A was drilled in 1998 with IP = 700 BOPD with 45% WC. W-19AL1 was drilled in March 2003 with
incremental production of 300 BOPD with 95% WC. Average production in 2006 was 190 BOPD with 95%
WC. A patch was installed across W-19AL1 in 2007 to see what W-19A could produce. The 2007 average
production was 24 BOPD with 99% WC.
A MIT-IA passed to 3000 psi on 2/16/2003. A MIT-OA failed on 2/14/2003 with a LLR of 2 bpm at 1200 psi.
The tubing has had no pressure tests since completion. A caliper run on 5/8/2007 indicates up to 80%
penetration at 6499' MD. 50% tubing penetrations over half of the tubing string with less than 10% body
metal loss.. The caliper also seemed to indicate buckled tubing from 7500' -10600' MD.
Other Requests:
Given rig floor height limitations, a MASP < 3000 psi, and the fact that the three ram drilling BOP
configuration is preferred to a two ram configuration with a spool, BPXA will execute the provisions of 20
AAC 25.285 (f) (1) regarding the initial testing of the ROPE as follows when existing wellhead or testing
equipment prevents the testing of the lowest set of pipe rams: That lowest set of rams will be tested at
the earliest opportunity during path-forward de-completion work, i.e., after the completion has been pulled
from the well. Safety concerns and spacing limitations with the wellhead height and tubing spool preclude
us from installing a spacer spool in the three-ram drilling BOP stack.
Scope of Work: Pump 50 bbls of cement through a cement retainer to P&A W-19A. Squeeze 34 bbls of
cement into the W-19AL1 lateral, targeting a TOC at 10,000' MD. Cut and pull the 4-1/2" L-80
completion. Cut and pull the 9-5/8" L-80 intermediate casing.
MASP: 2853 psi
Es#imated Start Date: May 14, 2010
Pre-ria prep work;
P&A Existin W-19A & W-19AL1 roduction intervals:
1 S Drift 4 '/2" tubing to top of KB patch at 10926'MD. POOH LD Drift. Pull KB
atch with GS s ear.
RU E-line. Set cement retainer below W-19AL1 window. Set depth will be
2 E 11,075' MD in the middle of a full 'oint.
RIH and sting into cement retainer. Pump/squeeze 50 bbls 15.8 ppg Class G
3 C cement to P&A W-19A. La 1 bbls above cement retainer. TOH.
Add regular cementing nozzle to coil. TIH to top of the ALt window at 10948'
MD. Perform infectivity test. Pump 34 bbls of cement (open hole volume +
4 C 40% excess). Do NOT run aggregate. Objective of the P&A is to seal off of the
water communication along the outside of the AL1 liner. Perform hesitation
s ueezes as necessa .Tar et TOC at 10,000' MD.
5 F MIT Tubing to 2,000 psi for 30 minutes.
RU Slickline. Drift 4-1/2" tubing and tag TOC. RIH and pull bottom GLM and
6 S leave o en for circulatin .
RU E-line. PU and run Jet Cutter & CCL to approximately 3000 feet MD.
7 E Perform 4 ~/z" tubin cut in middle of a 'oint C~ a roximatel 3000'MD.
MIT T X PC to 2,500psi for 30 minutes. Displace the well to clean seawater by
circulating down the tubing through the open GLM. Continue to circulate until
8 F clean seawater returns to surface. Freeze protect to 2,200' MD with diesel.
Bleed casin and annulus ressures to zero.
PPPOT-T (Positive Pressure Pack Off Test -Tubing) and PPPOT-IC (Positive
9 W Pressure Pack Off Test -Inner Casing). Tubing and 9 5/8" Casing will be
ulled. All lock down screws need to be functional.
Set a BPV in the tubing hanger. Secure the well. Remove the well house,
10 O level the pad as necessary. Provide total well preparation cost on the handover
form.
MIT OA with diesel or dead crude to 2000psi, record liquid leak rate (LLR) for
11 O 30 minutes and chart (last test in 2003 MIT OA leaked 2 bpm ~ 1250psi).
Leave o en to bleeder tank and monitor OA for flow.
Proposed Procedure:
1. MIRU Doyon 14.
2. Pull BPV. Circulate out freeze protection through tubing cut & displace well to seawater.
3. Install TWC and test f/below to 1000psi to confirm barriers. Combination MIT T x IA to 2500psi.
4. Nipple down tree and adaptor.
5. Nipple up and test BOPE to 3,500 psi.
6. Pull TWC. (Blanking plug?) Back out lockdown screws.
7. Pull tubing hanger, and 4-1 /2" tubing from the pre-rig cut.~"~' Ts~ L-~~'s
8. PU enough 5"DP and DC's to drill to 9 5/8" casing point (~ 10,500'MD)
9. MU 9-5/8" casing scraper assembly. RIH to 2900', circulate wellbore clean with seawater. TOH.
10. RU slickline. Set CIBP in 9 5/8" ~ 2850'MD.
•
11. Run aUSIT/CCUGR from the CIBP to surface to determine 9-5/8" TOC & collar locations. RD
slickline.
12. MU a 9-5/8" mechanical casing cutter assembly. RIH on DP and make cut per USIT log results.
Primary plan is to make the cut at 2775' to facilitate an exit out the bottom of 13 3/8" shoe.
Circulate to confirm cut, and assure the casing is clean by pumping (surfactant wash if needed).
13. Hang off mechanical casing cutter assembly with RTTS.
14. Change out upper rams to 9-5/8" rams.
15. Attempt to pull 9-5/8" pack-off to ensure that the pack-off can be pulled through the stack (pack-
off is plastic packed). Replace 9-5/8" pack-off. Split the stack to clean casing spool of plastic
packing if necessary. Test BOPE.
16. POOH and LD assembly.
17. MU a 9-5/8" casing spear assembly and unseat the casing. Circulate the Arctic Pack (to be
confirmed) from the OA annulus with warm diesel followed by sea water and detergent sweeps.
Pull the 9-5/8" casing from the cut and LD.
18. Change 9-5/8"fixed rams to 3-1/2" x 6" variable rams and test. Install wear bushing.
19. MU a 13-3/8" casing scraper assembly with an RTTS one joint above the scraper. RIH to 13-3/8"
shoe, set the RTTS, and pressure test the casing to 3500 psi for 30 min. POOH and LD
assembly.
20. MU cement plug assembly with stinger. RIH, circulate above CIBP, and set OH cement plug on
top of CIBP and 300' up into 13 3/8" shoe. Dis lace with seawater. TOH.
21. PU 12'/a" Dir/ R/RES/PWD BHA with PDC bit. RIH to clean out 13-3/8" and displace wellbore to
new LSND mud. KO cement plug and drill 20' of new formation. Pull into the shoe and conduct
LOT.
22. Continue drilling to +I- 200' and above the HRZ, ensure mud is in condition to 11.0 ppg. During
this time hold the pre-reservoir meeting highlighting kick tolerance and detection.
23. Directionally drill to 9 5/8" casing point into the Top Sag. This critical casing point will be picked by
the operations geologist.
24. Circulate to clean hole. Short trip to the shoe and RBIH to TD. TOH standing back DP and LD
BHA.
25. Change to 9-5/8" casing rams and test.
26. RU and run 9 5/8" 40# L-80 BTC x HYD 563 casing to Top Sag. Run an ES Cementer below the
UG1 "cretaceous"/Schrader if necessary. RD casing running equipment.
27. RU, PT lines, and pump cement for 9 5/8" casing. Land on mandrel hanger.
28. Change to 3-1/2" x 6" variable rams and test.
29. PU 4" DP for tapered string to TD.
30. Drill the B interval: MU 8'/z" Dir/GR/RES/PWD motor BHA and rock bit. TIH.
31. Swap out to 8.5ppg PowerVis mud system.
32. Drill out shoe plus 20' of new formation. Pull up into the shoe and conduct FIT.
33. Drill 8'/z" hole to 170' below the 9 5/8" casing shoe. TOH. LD bit/BHA.
34. MU 6 1/8" Dir/GR/RES/PWD BHA and PDC bit on bent housing motor.
35. Drill to W-196 TD in Ivishak Zone 4.
36. CBU, Short trip, circulate, and condition the hole for running the 4-1/2" production liner. Pull to 9
5/8" shoe, open circ sub, CBU or until hole cleans up, TOH. Rack back drill pipe.
37. Case & Cement the B interval: Run 7-5/8" 29.7# 13CR VAM Top x 4'/z" 12.6# 13CR VAM Top
liner with 5 'h" x 4 '/z" seal bore receptacle (SBR) and swell packer on 5" DP and 2-7/8" inner
string spaced out to pass the LWP into the 4'/z" liner. Centralize 4'/z" liner per RP.
38. Cement combination liner per plan with LH and LTP. Displace with pert pill and follow with
Geovis drilling mud. Circ out excess cement. Contingency LT squeeze if severe losses occur.
39. Clean out B lateral with tapered DP string.
40. Perf W-19B 4 '/z" liner: RU SLB and RIH w/ 1500' 2-1 /2" Powerjet Omega guns and a-fire
head(s) set ~ 4 SPF. Tag PBTD. Put guns on depth and fire.
41. TOH, verify all shots have fired, LD guns. No CO run required.
42. RU a-line. TIH with retrievable IBP, and set above the 4'/z" SBR.
43. Drill the W-196L1 lateral: PU the 7-5/8" retrievable whipstock BHA with it spaced out to set down
(--22K Ibs) on the 7-5/8" x 4'/z" crossover. Orient the whipstock to generally high side, set whip,
shear off, swap to drilling fluid, mill window, TOH, LD BHA.
P¢~-
PTD
•
44. PU 6 1/8" drilling assembly with TCI bit for the build and turn section. TIH & drill curve. Drill pilot
hole plugback W-196L1 PB1. PU hole to KO point for BL1 lateral and trench for open hole
sidetrack.
45. POOH to change BHA. PU 6 1/8" rotatable drilling assembly with PDC bit to drill to TD.
46. TIH & pull whipstock and anchor.
47. Case & Cement the BL1 interval: With the HR running tool with 2-7/8" inner string, run 4-'h" 13CR
12.6# VAM Top solid liner with 13CR bent joint and 13CR B-Hook Hanger with swell packers
near the junction to be set in 6.125" drilled hole. Land hook on window.
48. Pump cement. Displace with pert pill volume to fill the liner. Latch up plug and liner wiper dart in
the landing collar.
49. Pressure up to release the HR LRT, pick up, and run the spaced-out 2 7/8" inner string into the B
lateral to clean out cement below hook hanger and to the top of the retrievable plug
50. TOH & rack back 5" 14" DP and 2 7/8" inner string.
51. RU a-line. Conduct GRJB run, then USIT log from 7 5/8" LT to either surface or TOC, whichever
is lower (for offset Kuparik and Schrader Bluff isolation assurance).
52. Perf W-196L1 4 ~/z" liner: TIH and set drilling diverter which facilitates re-entry to the BL1 lateral.
TOH.
53. RIH to pert --1500' over 2000' distance with 2 1/2" Powerjet Omega guns and single ball-drop
fire head set C~3 4 SPF. Tag PBTD. Put guns on depth and fire.
54. TOH, verify all shots have fired, LD guns. No CO run required. RD SLB.
55. TIH on DP to pull the drilling diverter. TOH.
56. TIH to pull retrievable plug.
57. TIH to set the LEM (Lateral Entry Module) with estimated 20klbs down force to latch in to collet.
TOH Laying Down DP.
58. R/U, M/U 10,400' of 4-1/2" 13CR VAM Top completion tubing with 4'/z" seal stem on bottom, 4
~/2 x 9 5/8" production packer, 8 GLM's, and X-nipples.
59. Space the tubing into the top of SBR. Use minimal circ rate to wash SBR. Pick up to allow full
circulation.
60. Reverse circulate to seawater with corrosion inhibitor.
61. Land tubing into 4 ~/z" SBR and hanger. RILDS.
62. Drop ball and rod to seat in RHC in X-nipple below packer, pressure up to initiate set, and
continue up to test tubing and annulus separately to 3,500 psi each. Record the test.
63. TOH laying down DP.
64. Install and test TWC.
65. Nipple down BOP.
66. NU tree and adaptor flange, test tree to 5,000 psi. Pull TWC.
67. Reverse in diesel freeze protect to 2,200' U-tube. Install BPV.
68. Secure well. Release rig.
D. Post-Ria Work:
1 O Install wellhouse and flowlines. S-riser modifications may be required.
2 S MIRU slick line. Pull the ball and rod. Install gas lift valves.
Drilling Engineer: Garret Staudinger (907)564-4242
Production Engineer: Carolyn Kirchner (907)564-4190
Geologist: Allison Green (907)564-4710
ATTACH: Current Schematic
Proposed Schematic
TRFF = 4-1 /16" CM!/FMC
WELLHEAD = 13-5/8" FMC
ACTUATOR = BAK
.
KB. E1EV = 80.25'
BF. BLEV = 54.15'
KOP = 1510'
Max Angle = 96 @ 11600'
Datum MD = 11117'
Datum TVD = 8800' SS
13-3/8" CSG, 68#, L-80, iD =12.415" ~-j 2692•
Minimum ID = 3.80" @ 10767'
4-1/2" MILLED HES XN NIPPLE
~ W-19AL1
SAF~IOTES: 70° @ 11349'. W-19A
W ELLBORE IS STILL OPEN.
2111' 4-112" HES X NIP, ID = 3.813"
e c ~ AFT Iu1A Nr1RFl S
ST MD TVD DEV TYPE VLV LATCH PORT DATE
6 3071 2975 11 CA-MMG DOME RK 16 09/14/04
5 5398 4798 48 CA-MMG DOME RK 16 09/14/04
4 7154 5998 50 CA-MMG DOME RK 16 09/14/04
3 8489 6898 46 CA-MMG DOME RK 16 09/14/04
2 9586 7690 42 CA-MMG SO RK 24 09/14/04
1 10191 8135 43 CA-MMG DMY RK - 02/16/03
TOP OF 7" LNR 10308'
TOP OF CEMENT 10468'
9-5/8" CSG, 47#, L-80, ~ = 8.681" ~-j 11
PHZFORATION SUMMARY FOR WELLBORE A ~ L1
REF LOG: SWS MWD MEM RES ON 11/29/98
ANGLE AT TOP PERF: 57 @ 11154'
Note: Refer #o Production DB for historical pert data
SIZE SPF INTB~VAL Opn/Sqz DATE
SEE PAGE 2
FOR PERF
BREAKDOWN
OF 4-1/2" LNR --1 i
~4-1/2" TBG, 12.6#, L-8Q, .0152 bpf, ID = 3.958" ~
7" LNR 26#, L-80, .0383 bpf, ID = 6.276" ~ 10935'
MILLOUT WIDOW (W-19AL1)10948' - 10954'
FISH: 3-1/2" OD X 2-3/8" ID X 3-7/8" LONG ~ ???
PBTD 14406'
4-112" LNR 12.6#, L-80, .0152 bpf, ID = 3.953" 14495'
MILLOUT WINDOW (W-19A)10463' - 10513'
10712' H4-1/2" HES X NIP, ID = 3.813" ~
10723' 7" X 4-1 /2" BKR S-3 PKR, ID = 3.875"
14-1/2" HES X NIP, ID = 3.813" I
10767' 4-1/2" HES XN NIP
(MILL®02125/03), ID = 3.80"
10779' 4-112" WLC-G, ID = 3.958"
~_~ ELMD TT LOG NOT AVALABLE
10926'-10966' 4-1/2" BKR PATCH (09/29107),
ID = ????
10978' 3-112" BRK DEPLOY SLV, ID = 3.00"
10981' 3-1/2" X 2-7/8" XO,
ID = 2.441 "
~ ~ ~
PBTD I---1 11
2-718" LNR (SOLID & pREDRILLED), I-L1
6.16#, L-80, .0058 bpf, 1D = 2.372"
TD I~ 12701'
DATE REV 8Y COMMENTS DATE REV BY COMMENTS PRUDHOE BAY UNff
1990 J.JONES ORIGINAL COMPLETION 09/29/07 TEL/TLH PATCH SET WE3L: W-19AL1
22350
12/25/98 SIpETRACK(W-19Ai PERMIT No: 20
22006-01
029
50
03108/03 DAC/TL SIDtTRACK(W-19AL1) -
-
API No:
2' FEL
7' FNL & 1181
695
DD TOP OF WINDOW .
.
SEC 21, T11 N, R12E,
03/21/03 AF/KAK A
03/24/03 JM/KAK GLV GO
k
05/01/07 KCFlPJC XN NiP MILLm (02/25/03) a)
BP Exploration (Alas
WtZ.Li-EAD =
ACTUATOR =
KB. t3EV = 80.25'
BF. ELEV = 54.15'
KOP= 2800'
Max Angle = 101 deg
Datum MD =
Datum ND = 8800' SS
13-3/8" CSG, 72#, L-80, ID =12.415"
~ 9-5/8" CSG, 40#, L-80, HY D 563, ID = 8.835" ~
41/2" x 9-518" BKR PRENNER PKR
4-12" HES X NIP, ID = 3.813"
9-518" CSG, 40#, L-80, BTC, ID = 8.835"
9-5/8" X 7-5/8" Baker ZXP Liner Top Packer
9-5/8"x7-518" FLIXLOCK LH
9-5/8" CSG, 47#, L-80, BTC-M, ID = 8.681"
~ W-19B
W-19BL1
8500' 1
10,317'
10500'
10267'
10,317'
10317'
10467'
S 'TES: ALL CHROME LINER's,
JUANCT'IQN, 8~ COMPLETION
2200' -j 4-1/2" HES X NIP, ID = 3.813"
rac 11FT MANC~2F1 s
ST MD TVD DEV TYPE VLV LATCH PORT DATE
7
6
5
4
3
2
1
10,610' ~7 518" X5-1/2" BKR ZXP LTP, ID = 3.875"
10,510' Baker Lateral Entry Module
MILLOUT WINDOW 10540-10553'
14445' 4-1 i2" LNR, 12.6#, 13CR, VT, iD =
7-518" LNR, 29.7#, L-80, STL, ID = 6.875" ~~ 10600'
13CR 17ppf,VT,ID=4.767" Drift ~ 10 636'
' X4-112" SBR, ID = 4.767" Drift 10656'
5-172" X4-1/2" XO, ID = 3.958" ~-~ 10,662'
XXXX Lf 5.85" Sw eN Pkr 13CR VT,ID = 3.958"
Minimum ID = "~"
gKR Hook Hanger w/ non-sealing LEM
PERFORATION SUMMARY
REF LOG: TCP PERF
ANGLE AT TOP PERF: ~
Note: Refer to Production DB for historical pert data
SIZE SPF INTERVAL Opn/Sqz DWTE
2-12" 4 O
2-12" 4 O
2-12" 4 O
2-12" 4 O
2-1/2" 4 O
2-12" 4 O
2-12" 4 O
2-12" 4 O
~~ REV ~, CON9VF]VTS D~f{TE REV gY CO~tS PRUDHOE BAY UNIT
03/08H0 GJS ProposedCompletion WELL: 111~19B/BL1
P1=KNIT No:
API No:
~ Exploration (Alaska)
XXXX' ~~5,85" Swell Pkr 13CR VT,ID = 3.958"
4-1/2" LNR, 12.6#, 13CR, VAM TOP, .0152 bpf, iD =_3.958" 13648'
# •
Review of Sundry Applications 310-148 & 310-149
BP Exploration (Alaska) Inc.
Well PBU W-19A & W-19AL1
AOGCC Permits 198-069 & 202-235
Requested Action:
BP Exploration (Alaska) Inc. (BPXA) proposes to abandon the subject wellbores to
prepare the well for a rig sidetrack.
Recommendation:
I recommend approval of Sundry Applications 310-148 and 31-149 to allow BPXA to
perform this operation.
Discussion:
BPXA proposes to plug the subject wellbores to prepare the well for sidetracking. The
W-19A well was brought on production in January 1999 and the W-19AL1 well was
brought online in March 2003. The W-19A well produced approximately 280 MBO
before the W-19AL 1 lateral was added to the well. Prior to drilling the lateral the well
was producing approximately 150 BOPD at a water cut of approximately 75%. After
completion of the lateral production increased to approximately 450 BOPD but water cut
also increased to approximately 85%. Production decreased and water cut increased
steadily until November 2004 when oil production increased and water cut decreased
dramatically apparently because an FOR gas slug reached the well. This is evidenced by
the fact that the gas rate went from approximately 700 MCFPD to over 3,000 MCFPD in
one month and continued to climb for several months peaking at just under 13,000 MCFP
before dropping back to pre-slug levels. Also, during this time the well was switched
from gas-lift to naturally flowing which is further evidence of a gas slug reaching the
well. The elevated production lasted until about September 2005 when oil and gas
production and water cut returned to earlier levels.
The well remained on regular production until July 2006 at which time production was
running about 150 BOPD and the water cut was over 95%. A couple of short attempts,
totaling 34 days, have been made at restoring production from this well but oil rates have
remained low and water cuts have remained over 95%. Cumulative production from this
well is approximately 681 MBO.
Conclusion:
Plugging these wellbores so a new wellbore can be drilled to a more favorable location
appears to be the prudent choice for this well. Therefore, l recommend approving
BPXA's requests.
David S. Ro>~~`'~~~~.~°'
Sr. Reservoir Engineer
May 7, 2010
10/25/07
Schlumberger
SCANNED OCT 3 1 2007
NO. 4464
Alaska Data & Consulting Services
2525 Gambell Street, Suite 400
Anchorage, AK 99503-2838
ATTN: Beth
Company:
./
""J'?
c\" 'd-
'cl.,t>d'
State of Alaska
Alaska Oil & Gas Cons Gomm
Attn: Christine Mahnken
333 West 7th Ave, Suite 100
Anchorage, AK 99501
Field: P.Bay, Endicott, Aurora, Miln.! Pt., pt. Mac
Well Job# Loa Descri tion Date BL Color CD
W-19AL 1 11890312 SBHP & TEMP ;:)('~ ---:):-: '" 09/29/07 1
17-19A 11855512 SBHP SURVEY Iq-:}~n~ ~ 09/26/07 1
V-04 11855513 SBHP SURVEY ";"JöG" - 1 ~t:" 09/27/07 1
Z-21A 11594526 SBHPSURVEY ~-Inl 10/07/07 1
Z-03 11767142 LDL IC, "+-~ I 10/01/07 1
05-38 11686787 LDL Ie¡ ..ð - I'S f~ 09/27/07 1
Y -29A 11855514 DDL IC I~- l "9J.( 09/28/07 1
B-16 11676969 PRODUCTION PROFILE t.....-1 - n::JS 10/12/07 1
Z-22B 11594525 SBHPSURVEY- ;S,~. r^ ,.¡¿, 10/06/07 1
Z-14B 11849935 SBHP SURVEY.;:). ~(o -f'A<:: 10/02/07 1
P2-45A 11594529 SBHP SURVEY I c. r:t-f"I-/(f 10/16/07 1
17-09 11846820 LDL /1rI-()C () 10/19/07 1
F-33 11661176 MEMORY SBHPS I&:)(", - ("X)3 10/19/07 1
4-08/P-27 11630506 LDL I)"I(' 115"".}. - h{")'f( 10/04/07 1
3-17F/K-30 11649961 MCNL ~()3 -.::J.I{" -It ¡iÇ{/>/4 04/17/07 1 1
MPB-50 40011604 OH MWD/LWD EDITU,i\ ")"'-f - ::x::::J I~Af'<. 02/27/05 2 1
S-125 40015467 OH MWD/LWD EDIT ..:;){)~-rYk?. It #~ { .Q 07114/07 2 1
PLEASE ACKNOWLEDGE RECEIPT BY SIGNING AND RETURNING ONE COPY EACH TO:
BP Exploration (Alaska) Inc.
Petrotechnical Data Center LR2-1
900 E. Benson Blvd.
Anchorage, Alaska 99508
Alaska Data & Consulting Services
2525 Gambell Street, Suite 400
Anchorage, AK 99503-28 8
ATTN: Beth i
Date Delivered:
Received by:
.
.
,~~,/.
STATE OF ALASKA ~'~'~
ALASKA OIL AND GAS CONSERVATION COM~ION
REPORT OF SUNDRY WELL OPERATIONS
1. Operations Abandon ~ Repair Well ~ Plug Perforations ~ Stimulated Other 0 PATCH TUBING
Performed: Alter Casing ~ Pull Tubing ~ Perforate New Pool ~ Waiver ~ Time Extension
Change Approved Program ~ Operat. Shutdown[] Perforate ~ Re-enter Suspended Well
2. Operator BP Exploration (Alaska), Inc. 4. Current Well Class: 5. Permit to Drill Number:
Name: Development ~~ Exploratory 202-2350 -
3. Address: P.O. Box 196612 StratlgraphlC ~' ServiCe ` ~ 6. API Number:
Anchorage, AK 99519-6612 50-029-22006-60-00 "
7. KB Elevation (ft): 9. Well Name and Number:
83.4 KB W-19AL1 --
8. Property Designation: 10. Field/Pool(s): ,
ADLO-028262 ' PRUDHOE BAY Field/ PRUDHOE OIL Pool
11. Present Well Condition Summary:
Total Depth measured 12675 ~ feet Plugs (measured) None
true vertical 8953 - feet Junk (measured) None
Effective Depth measured 11930' feet
true vertical 8976 ~ feet -
Casing Length Size MD TVD Burst Collapse
Conductor 80' 20" Surface - 110' Surface -
Surface 2692' 13-3/8" 68# L-80 Surface - 2962' Surface - 2957' 5020 2260
Production 10463' 9-5/8" 47# L-80 Surface - 10463' Surface - 8417' 6870 4760
Liner 627' 7" 26# L-80 10308' - 10935' 8307' - 8768' 7240 5410
Liner 174' 4-1/2" 12.6# L-80 10774' - 10948' 8646' - 8778' 8430 750
-~---~ Liner 984' 8.81#/6.2#/6.16# 10978' - 11962' 8800' - 8977' 4~ ~`~1t1t~~ ~ ~,~~-$r ~~
Perforation depth: Measured depth: OH 10948' - 10978' OH 11962' - 12701' SL 11249' - 11408' SL 11706' - 11930' S~G~G h
S
`
True Vertical depth: OH 8778' - 8800' OH 8977' - 8952' SL 8906' - 8918' SL 8958' - 8976' tSO~~T~~
Tubing; (size
grade
and measured depth) 4-1 /2" 12
6# L-80 SURFACE - 10779' ~~
,
,
.
Packers and SSSV (type and measured depth) 7x4-1/2" bkr s-pkr 10723'
~~~~~ N O1~ ~! 2007 0
~~
°
a
w
0 0
0 0
12. Stimulation or cement squeeze summary:
Intervals treated (measured): ~ a~r~pv 3~ E~~ ~~ C1ys _ `Ot,s` ~ ~ ~
Treatment descriptions including volumes used and final pressure:
sti•~~ s off- w - ~~, A ~.`i ~~ ~l `° 1. ~
13. Representative Daily Average Production or Injection Data
Oil-Bbl Gas-Mcf Water-Bbl Casing Pressure Tubing pressure
Prior to well operation: Shut in 0 0 0 0
Subsequent to operation: Shut in 0 0 0 0
14. Attachments: 15. Well Class after proposed work'
Copies of Logs and Surveys Run Exploratory [~ Development ~' Service 3
Daily Report of Well Operations X 16. Well Status after proposed work:
Oil Gas WAG ~ GINJ WINJ WDSPL
17. I hereby certify that the foregoing is true and correct to the best of my knowledge. Sundry Number or N/A if C.O. Exempt:
N/A
Contact Gary Preble
Printed Name Gary Preb Title Data Management Engineer
/ ='
Signature Phone 564-4944 Date 10/8/2007
Form 10-404 R vised 04/2006 1 1 Q ~ ~ ~ n ~ ~ ~ ~ ~~( Original Only
•
W-19AL1
DESCRIPTION OF WORK COMPLETED
NRWO OPERATIONS
EVENT SUMMARY
ACTtVITYDATE SUMMARY ~
9/29/2007:LOGGED PRESSURE TEMPERATURE DOWN FROM SURFACE TO 11,420'.
::STOPPED LOGGING DUE TO DEVIATION.
:.SET 4.5" BAKER KB PATCH FROM 10,926' TO 10,966' (ELEMENT TO
!!ELEMENT) ACROSS 2 7/8" LATERAL EXIT WINDOW.
****JOB COMPLETE'`***
FLUIDS PUMPED
BBLS
3 DIESEL
3 TOTAL
e
e
MICROFILMED
07/25/06
DO NOT PLACE
ANY NEW MATERIAL
UNDER THIS PAGE
F:\LaserFiclte\CvrPgs _ Inserts\Microfilm _ Marker.doc
)
)
'~ E~\\f
OC1 2 6 LüGS
~\\~~~\r.3 m\ 81,
WELL LOG TRANSMITTAL
To: State of Alaska
Alaska Oil and Gas Conservation Comm.
Attn.: Howard Okland
333 West 7th Avenue, Suite 100
Anchorage, Alaska 99501
February 25, 2004
RE: MWDFonnationEvaluationLogs: W-19AL1, W-19AL1 PB1 &L1 PB2,AK-MW-2299019
W..l9A Ll" W-l9A Ll PDl & W-l9A Ll PD2:
Digital Log Images:
50-029-22006-60,,70 & 71
:tÞ I 33 ý7J
1 CD Rom
PLEASE ACKNOWLEDGE RECEIPT BY SIGNING AND RETURNING THE ATTACHED
COPIES OF THE TRANSMITTAL LETTER TO THE ATTENTION OF:
Sperry-Sun Drilling Services
Attn: Rob Kalish
6900 Arctic Blvd.
Anchorage, Alaska 99518
BP Exploration (Alaska) Inc.
Petro-technical Data Center, LR2-1
900 E. Benson Blvd.
Anchorage, Alaska 99508
Date: jf ~~)-
1LJ ÒJjJ
Signed:
'~--"'-'-"''''''
~ANNEf) OCT 3 1 2005
( .
ø.~^--~3) ~t/4.-
7~;L~'~1
DATA SUBMITTAL COMPLIANCE REPORT
4/1/2005
Permit to Drill 2022350
Well Name/No. PRUDHOE BAY UNIT W-19AL 1
Operator BP EXPLORATION (ALASKA) INC
,) {f(,..1 À. it; FJ. ~ð ò 3
API No. 50-029-22006-60-00
MD
12675 ~ TVD
8953/
Completion Date 3n/2003
~
Completion Status
1-01L
Current Status 1-01L
UIC N
---- -------
REQUIRED INFORMATION
Mud Log No Samples No Directional Survey Yes
------
-"-------------
DATA INFORMATION
Types Electric or Other Logs Run: MWD, SGRC, EWR, Memory GR, CCL (data taken from Logs Portion of Master Well Data Maint)
Well Log Information:
Log/ Electr
Data Digital Dataset Log Log Run Interval OH/ ~
Type Med/Fnnt Number Name Scale Media No Start Stop CH Received Comments
f------·--- A Directional Survey Log is
required to be submitted.
This record automatically
created from Permit to Drill
Module on: 12/12/2002.
An H2S Measurement is
required to be submitted.
This record automatically
created from Permit to Drill
Module on: 12/12/2002.
i Rpt Directional Survey 12275 12675 Open 4/17/2003
Rpt Directional Survey 1 0941 11925 Open 4/17/2003 PB1
Rpt Directional Survey 11543 12701 Open 4/17/2003 PB2
ED 0 Directional Survey 10941 11925 Open 4/17/2003 PB1
ED 0 Directional Survey 12275 12675 Open 4/17/2003
¡ED 0 Directional Survey 11543 12701 Open 4/17/2003 PB2 .~
~:t ~2001 LIS Verification 1,3,4 10931 11925 Open 6/2/2003 W-19A L1 PB1
----
0 2001 I nd uction/Resistivity 1,3,4 10931 11883 Open 6/2/2003 MWD-GR, EWR4, ROP for
W-19A L 1 PB1
v!:pt [11984 LIS Verification 1-6 1 0931 12674 Open 6/2/2003
: 0 0 11984 Induction/Resistivity 1-6 10931 12649 Open 6/2/2003 MWD-GR, EWR4, ROP-MD
u(:pt L 1990 LIS Verification 1-6 10931 12701 Open 6/10/2003
fED 0 1990 Induction/Resistivity 1-6 10931 12676 Open 6/2/2003 MWD-GR, EWR4, ROP-MD
I
t: ~ Asc L2015 LIS Verification 2 10672 11062 Case 6/10/2003 Liner Top Tie In Log,
Memory GRlCCL
I Pds 12015 Casing collar locator 2 10672 11 062 Case 6/10/2003 Liner Top Tie In Log,
~ Memory GRlCCL
--~--------
DATA SUBMITTAL COMPLIANCE REPORT
4/1/2005
Permit to Drill 2022350 Well Name/No. PRUDHOE BAY UNIT W-19AL 1 Operator BP EXPLORATION (ALASKA) INC API No. 50-029-22006-60-00
MD 12675 TVD 8953 Completion Date 3n /2003 Completion Status 1-01L Current Status 1-01L UIC N
~-----
, 09 12015 Casing collar locator 2 Blu 10672 11062 Case 6/1 0/2003 Liner Top Tie In Log,
Memory GR/CCL
(lED C Pdf 12432 Rate of Penetration 25 1-6 10960 12675 Open 2/26/2004 ROP, DGR, EWR,
I Horizontal Presentation -
I MWD
I
I
lED C Pdf 12432 Induction/Resistivity 25 1-6 10960 12675 Open 2/26/2004 ROP, DGR, EWR,
Horizontal Presentation -
MWD
ED C Lis 12432 Rate of Penetration 1-6 10960 12675 Open 2/26/2004 ROP, DGR, EWR,
Horizontal Presentation - '-'
MWD
ED C Lis 12432 Induction/Resistivity 1-6 10960 12675 Open 2/26/2004 ROP, DGR, EWR,
Horizontal Presentation -
MWD
ED C Pdf 12432 Rate of Penetration 25 1-4 10960 11925 Open 2/26/2004 ROP, DGR, EWR,
V Horizontal Presentation -
MWD - PB1
ED C Pdf 12432 Induction/Resistivity 25 1-4 10960 11925 Open 2/26/2004 ROP, DGR, EWR,
Horizontal Presentation -
MWD - PB1
ED C Lis 12432 Rate of Penetration 1-4 10960 11925 Open 2/26/2004 ROP, DGR, EWR,
Horizontal Presentation -
MWD - PB1
ED C Lis 12432 I nd uction/Resistivity 1-4 10960 11925 Open 2/26/2004 ROP, DGR, EWR,
Horizontal Presentation -
MWD - PB1
ED C Pdf 12432 Rate of Penetration 25 1-6 10960 12701 Open 2/26/2004 ROP, DGR, EWR,
Horizontal Presentation - -
MWD - PB2
!ED C Pdf 12432 Induction/Resistivity 25 1-6 10960 12701 Open 2/26/2004 ROP, DGR, EWR,
! Horizontal Presentation -
MWD - PB2
ED C Lis 12432 Rate of Penetration 1-6 10960 12701 Open 2/26/2004 ROP, DGR, EWR,
Horizontal Presentation -
MWD - PB2
;ED C Lis 12432 I nd uction/Resistivity 1-6 10960 12701 Open 2/26/2004 ROP, DGR, EWR,
j/ Horizontal Presentation -
! MWD - PB2
L,__
Permit to Drill 2022350
MD 12675
TVD 8953
Well Cores/Samples Information:
Name
ADDITIONAL INFORMATION
Well Cored? yQ
Chips Received? ~
Analysis
Received?
~
----.-
Comments:
r_________ __~
Compliance Reviewed By:
DATA SUBMITTAL COMPLIANCE REPORT
4/1/2005
Well Name/No. PRUDHOE BAY UNIT W-19AL 1
Operator BP EXPLORATION (ALASKA) INC
API No. 50-029-22006-60-00
Completion Date 3n/2003
Completion Status 1-01L
Interval
Start Stop
Sent
Received
Daily History Received?
Formation Tops
I r
~
I
Current Status 1-01L
Sample
Set
Number Comments
~N
&IN
Date:
UIC N
~
J /J¡; ,)ß-<Jy--
-
)
)
f).Od. --d35
WELL LOG TRANSMIITAL
To: State of Alaska
Alaska Oil and Gas Conservation COllill.
Attn.: Howard Okland
333 West 7th Avenue, Suite 100
Anchorage, Alaska 99501
February 25,2004
RE: MWD Formation Evaluation Logs:W-19ALl, W-19ALl PBl & Ll PB2, AK-MW-2299019
W-19A Ll" W-19A Ll PBl & W-19.A Ll PB2:
Digital Log Images:
50-029-22006-60, 70 & 72
1 CD ROITI } ¿)L.}d~
PLEASE ACKNOWLEDGE RECEIPT BY SIGNING AND RETURNING THE ATTACHED
COPIES OF THE TRANSMITTAL LETTER TO THE ATTENTION OF:
Sperry-Sun Drilling Services
Attn: Rob Kalish
6900 Arctic Blvd.
Anchorage, Alaska 99518
BP Exploration (Alaska) Inc.
Petro-technical Data Center, LR2-1
900 E. Benson Blvd.
Anchorage, Alaska 99508
Date:
Signe~\~ ~<-C~
RECEIVED
FE3 2 6 2004
~~Iaska Œ! & Gas Cons. Commission
tr..-k~~
t:hmh~...
'R~~",,~
Schlumbepger
Alaska Data & Consulting Services
3940 Arctic Blvd, Suite 300
Anchorage, AK 99503-5711
ATTN: Beth
Well
vWþ9AL1 Q2a2-d., ~5
v-P2-57 A t)tJÇ? - í?J. \ ¡,)
D.S. 12-20\ 15d. ~\1fi
D.S.15-21A 1'i9. -0 ~ .
B-04 l1-fL -0 -., 0
YF-10A ()-(!;:Jð -- d lQ "'t
".Ð"-30A ~af -d l-{ e)
~2B - \~C)
v-K-01 -'. \ Cl \
Job#
Log Description
06/05/03
NO. 2800
Company: State of Alaska
Alaska Oil & Gas Cons Comm
Attn: Lisa Weepie
333 West 7th Ave, Suite 100
Anchorage, AK 99501
Field: Prudhoe Bay
Color
Date Blueline Prints CD
03/06/03 1 1 - 1~l)J~
03/15/03 1 1 I 0/ I()
06/03/03 1
05/15/03 1
05/17/03 1
05/18/03 1
OS/20/03 1
OS/22/03 1
05/16/03 1
.~
23099 TIE-IN MGRlCCL
23272 MCNL
LDL
PRODUCTION PROFILE
PRODUCTION PROFILE/GHOST
LDL
MEM PRODUCTION PROFILE
MEM PRODUCTION PROFILE
LDL
~-.J_
PLEASE ACKNOWLEDGE RECEIPT BY SIGNING AND RETURNING ONE COpy EACH TO:
BP Exploration (Alaska) Inc.
Petrotectnical Data Center LR2-1
900 E. Benson Blvd.
Anchorage, Alaska 99508
Date Delivered:
(0 / / 0 ~- (~-'?
C~~~·< I"~ -~-
¡¡¡,~ ~.-.~ ,.-,~"'\' '. ~"""'--"-:,-____J..-.',".
¡¡ fI ~ -. ~ II \ <'! ,S .~
Iî~ ij-=, M r= fi - - F I j;j
¡,:¡ -t.t'~ ~- ~~
Schlumberger GeoQuest
3940 Arctic Blvd, Suite 300
Anchorage, AK 99503-5711
ATTN: Beth riJ
_ J - .,.
. --- - '«4 ~. .
Received bY<J; f7/lf[ ¡; V~
JUN 1 0 2DO~}
þJègk~ G~~: &
'",1~'~ 11ft~:~5"t~11
~0:, t"\ ~?~V*<r:<
Schlumbepger
Alaska Data & Consulting Services
3940 Arctic Blvd, Suite 300
Anchorage, AK 99503-5711
ATTN: Beth
Well
00~' Â\1W-19AL1 ---.
~~~~ P2-57A,·~
i JB. .. t C\ \ D.S. 12-20 ----4
i G\C\' 02.~ D.S.15-21A·J
11 0 . Ó 3'2 8-04 '--J
~(¡\). 0 (':1 F-10A .---..J
?-C1¿1.. )-~O D-30A "-J
",u~·i6'J D-228 ,-1
J ~'?J . I Z t K-01 .--...1
Job#
Log Description
23099 TIE-IN MGRlCCL
23272 MCNL
LDL
PRODUCTION PROFILE
PRODUCTION PROFILE/GHOST
LDL
MEM PRODUCTION PROFILE
MEM PRODUCTION PROFILE
LDL
PLEASE ACKNOWLEDGE RECEIPT 8Y SIGNING AND RETURNING ONE COpy EACH TO:
BP Exploration (Alaska) Inc.
Petrotectnical Data Center LR2-1
900 E. Benson Blvd.
Anchorage, Alaska 99508
Date Delivered:
~/IO~():3
06/05/03
NO. 2800
Company: State of Alaska
Alaska Oil & Gas Cons Comm
Attn: Lisa Weepie
333 West 7th Ave, Suite 100
Anchorage, AK 99501
Field: Prudhoe Bay
Color
Date 81ueline Prints CD
03/06/03 1 1
03115103 1 1
06103103 1
05115/03 1
05/17/03 1
05/18/03 1
OS/20/03 1
OS/22103 1
05/16/03 1
-..
--
Schlumberger GeoQuest
3940 Arctic Blvd I Suite 300
Anchorage. AK 99503-5711
ATTNo B~DLÞ' II1A ( /' I1Æ:
Received ~ þ-- '--- ¡ \k:.,j , ,/iVi/t--:;
\. \
)
)
d O() -¿i3S
l' 990
WELL LOG TRANSMITTAL
To: State of Alaska
Alaska Oil and Gas ConselVation COtnm.
Attn.: Lisa Weepie
333 West 7th Avenue, Suite 100
Anchorage, Alaska
May 15,2003
RE: MWD Fonnation Evaluation Logs W-19A Ll PB2,
AK-MW-2299019
1 LDWG fonnatted Disc with verification listing.
~I#: 50-029-22006-71
PLEASE ACKNOWLEDGE RECEIPT BY SIGNING AND RETURNING A COpy OF THE TRANSMITTAL
LETTER TO THE ATTENTION OF:
Sperry-Sun Drilling Services
Attn: Rob Kalish
6900 Arctic Blvd.
Anchorage, Alaska 99518
BP Exploration (Alaska) Inc.
Petro-Technical Data Center LR2-1
900 E. Benson Blvd.
Anchorage, Alaska 99508
Date:
""<:--~ ~ --,.
S· d·\- J \ - ~ (\,.-... ........ -Ao.
tgne . \~C)\.:.~Ç. ,/\}'-. \-),~..:~.)~
;i'']1 ;!=~' ~ r= ~'V' 'b; r'1)
t"\, [.:. \~; ~ ~ ,¡:: W
JUN 0 2 2003
~4jras~a (J~'l (~ {;8~, (~~~.~~. ·~:c~.1n1~3~IDn
.l\nc~H}r~G~:;
~~bf\\~
)
)
t}Od -d35
1 f9~ Y
WELL LOG TRANSMITTAL
To: State of Alaska
Alaska Oil and Gas Conservation Comm.
Attn.: Lisa Weepie
333 West 7th Avenue, Suite 100
Anchorage, Alaska
May 13, 2003
RE: MWD Formation Evaluation Logs W-] 9A L1,
AK-MW-2299019
1 LDWG formatted Disc with verification listing.
API#: 50-029-22006-60
PLEASE ACKNOWLEDGE RECEIPT BY SIGNING AND RETURNING A COpy OF THE TRANSMITTAL
LETTER TO THE ATTENTION OF:
Sperry-Sun Drilling Services
Attn: Rob Kalish
6900 Arctic Blvd.
Anchorage, Alaska 99518
BP Exploration (Alaska) Inc.
Petro-Technical Data Center LR2-1
900 E. Benson Blvd.
Anchorage, Alaska 99508
Date:
Sign~i~\=\Q~\ ~;\..j~~~
~':: t
=-t1~.·. a
l-rur,j O?" ..
~~~ ~
\--- b ~~" '-C)
)
}
1,&08-835
JBCú\
WELL LOG TRANSMITTAL
To: State of Alaska
Alaska Oil and Gas Conservation Comm.
Attn.: Lisa Weepie
333 West 7th Avenue, Suite 100
Anchorage, Alaska
May 15, 2003
RE: MWD Formation Evaluation Logs W-19A Ll PB 1,
AK-MW-2299019
1 LDWG formatted Disc with verification listing.
~I#: 50-029-22006-70
lrY':n ""')
(þtV .. <....
PLEASE ACKNOWLEDGE RECEIPT BY SIGNING AND RETURNING A COpy OF THE TRANSMITTAL
LETTER TO THE ATTENTION OF:
Sperry-Sun Drilling Services
Attn: Rob Kalish
6900 Arctic Blvd.
Anchorage, Alaska 99518
BP Exploration (Alaska) Inc.
Petro-Technical Data Center LR2-1
900 E. Benson Blvd.
Anchorage, Alaska 99508
Date:
Signed~0l~·~ ,~G '-C ~V\..
(:' r:~ ~ \/ t: [)
JU¡'·¡ O?
'.,i
;-'u'C::<.
~, :;':'... ," , "..~
.~.' i '.' . h
K~~ \\~~I
')
)
r
STATE OF ALASKA
ALASKA OIL AND GAS CONSERVATION COMMISSION
WELL COMPLETION OR RECOMPLETION REPORT AND LOG
1. Status of Well
BOil 0 Gas 0 Suspended 0 Abandoned 0 Service
2. Name of Operator
BP Exploration (Alaska) Inc.
3. Address
P.O. Box 196612, Anchorage, Alaska 99519-6612
4. Location of well at surface
696' SNL, 1181' WEL, SEC. 21, T11 N, R12E, UM
At top of productive interval
440.6' NSl, 340.4' WEl, SEC. 16, T11 N, R12E, UM X = 60.9739, Y = 5964629 1 Q. Well Number
At total depth
490.4' NSl, 4742' WEL, SEC. 16, T11N, R12E, UM X = 60.8393, Y = 596510.7
11. Field and Pool
5. Elevation in feet (indicate KB, DF, etc.) 6. Lease Designation and Serial No. Prudhoe Bay Field 1 Prudhoe Bay Pool
RKB = 83.4' ADL 0.28263
12. Date Spudded 13. Date T.D. Reached 14. Date Comp., Susp., or Aband.
2/26/200.3 3/5120.0.3 3/7/20.0.3
17. Total Depth (MD+TVD) 18. Plug Back Depth (MD+TVD) 19. Directional Survey
12675 8953 FT 11930. 8976 FT B Yes 0 No
22. Type Electric or Other Logs Run
MWD, SGRC, EWR, Memory GR, CCl
23.
CASING
SIZE
20."
13-3/8"
9-5/8"
7"
4-1/2"
MD
11249' - 11408'
11706' - 11930'
TVD
TVD
8905' - 8918'
8957' - 8976'
MD
OIL-BBL
No core samples were taken.
Multilateral
Classification of Service Well
;~Tt~"~::;~1;~~~};,!Ç
.,h~~..'¡-~' ','.',
~:,' . i t'
'('::-~ -.r ' "I,
;';:~~i« ,":. .i":~
J ;f\o-' ~ ,~, '. ~, '!:,"'·":'"""1.'qt:
~~~)~,,·:~~Ù:~,,'~::,:,~~;··\:
7. Permit Number
20.2-235
8. API Number
50.- 0.29-220.0.6-60.
9. Unit or Lease Name
Prudhoe Bay Unit
X = 6120.49, Y = 5959561
17-1/2"
12-1/4"
8-112"
3-3/4"
25.
W-19AL 1
15. Water depth, if offshore 16. No. of Completions
NI A MSL One
20.. Depth where SSSV set 21. Thickness of Permafrost
(Nipple) 2111' MD 190.0.' (Approx.)
CEMENTING RECORD
AMOUNT PULLED
CASING, liNER AND CEMENTING RECORD
SETTING DEPTH HOLE
Wr. PER FT. GRADE Top BOTTOM SIZE
Conductor Surface 110.'
68# L-8D Surface 2692'
47# l-8Q Surface 10.463'
26# l-8Q 10.30.8' 10.935'
12.6# l-8D 10.774' 10948'
8.81#/6.2#/6.16# [-80. 10.978' 11962'
24. Perforations open to Production (MD+ TVD of Top and
Bottom and interval, size and number)
2-7/8" Slotted Liner
6"
3723 cu ft Coldset II
2392 cu ft Class 'G'
174 cu ft Class 'G'
528 cu ft Class 'G'
Uncemented Slotted Liner
TUBING RECORD
DEPTH SET (MD)
12779'
PACKER SET (MD)
10.723'
. 3-1/2" x 3-3116" x 2-7/8"
SIZE
4-1/2", 12.6#, l-8D
26. ACID, FRACTURE, CEMENT SQUEEZE, ETC.
DEPTH INTERVAL (MD) AMOUNT & KIND OF MATERIAL USED
250.0.' Freeze Protected with 60./40. MeOH
GAs-McF
899
GAs-McF
Wi 11& _I
27. PRODUCTION TEST
Date First Production Method of Operation (Flowing, gas lift, etc.)
April 10., 20.0.3 Gas Lift
Date of Test Hours Tested PRODUCTION FOR OIL-BBL
4/13/20.0.3 4 TEST PERIOD 465
Flow Tubing Casing Pressure CALCULATED
Press. 24-HoUR RATE
28. Brief description of lithology, porosity, fractures, apparent dips a~~;~~~:: of oil, gas or water. Submit coßI;,C [ I V[ D
~\\I\S at' \ø
" G(-"
WATER-BBL
2,448
W ATER-BBL
CHOKE SIZE
176/64
OIL GRAVITY-API (CORR)
GAS-OIL RATIO
1,933
APR 1 5 2003
Alaska Oil & Gas Cons. Commission
Anchorage
Form 10.-40.7 Rev. 0.7-0.1-80
OR\G NAL
Submit In Duplicate
)
)
29.
Geologic Markers
30.
Formation Tests
Marker Name
Measured
Depth
True Vertical
Depth
Include interval tested, pressure data, all fluids recovered and
gravity, GOR, and time of each phase.
Shublik A
10970'
8794'
Shublik B
11 047'
8845'
Shublik C
11091'
8867'
Eileen
11150'
8890'
Zone 48
11193'
8900'
45N
11530'
8935'
"I:¡ 11'1111
RECEIVED
APR 1 5 700.i
Alaska Oil & Gas Cons. Commission
Anchorage
31. List of Attachments:
Summary of Pr~-Aig Work and Daily Drilling Reports, Surveys
~ I I ~ NJ 1(' 'I ' ¡.\\
32. I ~erebY certify that the foyoin~ is true and correct to the best of my knowledge
Signed TerrieHubble '10Ñ\i..R ~ Title Technical Assistant Date 04 -Ie.¡·o ~
W-19AL 1 202-235 Prepared By Name/Number: Terrie Hubble, 564-4628
Well Number Drilling Engineer: Alistair Sherwood, 564-4378
Permit No. I Approval No.
INSTRUCTIONS
GENERAL: This form is designed for submitting a complete and correct well completion report and log on all types of lands and leases in Alaska.
ITEM 1: Classification of Service Wells: Gas injection, water injection, steam injection, air injection, salt water disposal, water supply for injection, observation,
iïìjection for in-situ combustion.
ITEM 5: Indicate which elevation is used as reference (where not otherwise shown) for depth measurements given in other spaces on this form and in any
attachments.
ITEM 16 AND 24: If this well is completed for separate production from more than one interval (multiple completion), so state in item 16, and in item 24 show the
producing intervals for only the interval reperted in item 27. Submit a separate form for each additional interval to be separately produced, showing the data
pertinent to such interval.
ITEM 21: Indicate whether from ground level (GL) or other elevation (DF, KB, etc.).
ITEM 23: Attached supplemental records for this well should show the details of any multiple stage cementing and the location of the cementing tool.
ITEM 27: Method of Operation: Flowing, Gas Lift, Rod Pump, Hydraulic Pump, Submersible, Water Injection, Gas Injection, Shut-In, Other-explain.
ITEM 28: If no cores taken, indicate 'none'.
Form 10-407 Rev. 07-01-80
ORIGINAL
J"~ :,' '11'1"", ~ f' ,"~' '\
)
)
Well:
Field:
API:
Permit:
Date
W-19AL 1
Prudhoe Bay Unit
50-029-22006-60
202-235
Accept:
Spud:
Release:
Rig:
02/24/03
02/26/03
03/07/03
Nordic #1
PRE-RIG WORK
12/07/02
VALVE CREW TESTED THE MVIWV/SV TO 3500 PSI. OK.
12/12/02
PPPOT-T PASSED TO 5000 PSI FOR CTD PREP.
12/13/02
TIIIO=240/1600/80 TEMP=70 OA FL ( PRE MIT OA) OA FL @ SURFACE.
01/23/03
T/I/O = 310/1540/80. TEMP = 80. (CTD PREP). IA FL @ 9895'. OA FL @ SURFACE.
02/14/03
T/I/O= 250/1700/80. MIT-OA TO 2000 PSI FAILED, LLR OF 2 BPM @ 1250 PSI (PRE-CTD). MIRU LRS AND
PUMPED 5 BBLS OF DIESEL DOWN OA TO FLUID PACK. PRESSURE STEADILY INCREASED TO 1600 PSI,
THEN BROKE DOWN TO 1000 PSI AT SAME PUMP RATE WITH 10 BBLS AWAY. INCREASED PUMP RATE
TO 2 BPM, AND ESTABLISHED A LLR FOR AN ADDITIONAL 10 BBLS @ 1250 PSI. FINAL PRESSURES;
250/1700/200. MIT OA TO 2000 PSI, FAILED WI LLRT OF 2 BPM @ 1250 PSI.
02/15/03
WELL FLOWING ON ARRIVAL. SET WHIDDON C-SUB. PULL OGLV FROM STA# 1.
02/16/03
PULL LGLV FROM STA# 6,5, & 3 - SET DGLV (RK) STA# 6,5,3 & 1 - LOAD AND TEST IA TO 3000 PSI.
MIT IA TO 3000 PSI PASSED WITH 835 BBLS OF CRUDE PUMPED DOWN THE INNER ANNULUS.
02/17/03
DRIFT 3.70 GAUGE RING TO 11,150' SLM (NO PROBLEMS). DRIFT 3-1/2 GR & 20' X 3.70" DUMMY
WHIPSTOCK TO 10,532' SLM, WOULD NOT PASS THRU. DRIFT 3.63" CENT, 8' STEM, 3.50" CENT, 7' STEM,
3.70" GAUGE RING TO 11,000' SLM (NO PROBLEMS). DRIFT WIWEATHERFORD DRIFT 12' X 3.64" - SET
DOWN @ 11,024' SLM - TIGHT SPOT @ 10,940' SLM. TURN WELL OVER TO DSO. PUMP TO KILL TUBING
PRESSURE PRIOR TO E-LlNE WORK
02/18/03
SET TIW 4-112" WHIPSTOCK ANCHOR. DEPTH REFERENCED TO SWS MWD RES LOG DATED 29-NOV-
1998. TAG BOTTOM AT 11048'.4-1/2" TIW WS-R-BB PACKER - WHIPSTOCK ANCHOR LUG SET AT 10957.3'.
DEPTH OF LUG WILL PUT THE TOP OF WHIPSTOCK AT 10945 WHEN INSTALLED. PACKER LUG SLOT SET
82.5 DEGREES LEFT OF HIGHS IDE LOOKING DOWNHOLE. SLACK OFF TENSION AFTER SHOT TO VERIFY
SET. PAD OPERATOR NOTIFIED, WELL LEFT SHUT IN.
)
)
Legal Well Name:
Common Well Name:
Event Name:
Contractor Name:
Rig Name:
W-19A
W-19
REENTER+COMPLETE
NORDIC CALISTA
NORDIC 1
Start: 2/24/2003
Rig Release: 3/7/2003
Rig Number:
Spud Date: 11/15/1998
End: 3/7/2003
2/23/2003
04:30 - 07:30
Date From - To Hours Task Code NPT Phase
07:30 - 08:00
08:00 - 09:00
09:00 - 12:30
12:30 - 13:45
13:45 - 14:15
14:15 -18:00
18:00 - 00:00
00:00 - 03:30
03:30 - 04:45
04:45 -
2/24/2003
00:00 - 02:00
02:00 - 02:30
02:30 - 03:30
03:30 - 04:45
04:45 - 06:00
06:00 - 06:30
06:30 - 10:30
10:30 - 12:00
12:00-14:00
14:00 - 16:00
16:00 - 16:30
16:30 -17:30
17:30 - 18:45
18:45 - 20:00
20:00 - 21 :30
21 :30 - 00:00
2/25/2003
00:00 - 02:15
02:15 - 03:45
03:45 - 04: 15
04:15 - 04:40
04:40 - 05: 10
3.00 RIGD P
0.50 MOB P
1.00 MOB P
3.50 MOB P
1.25 MOB P
0.50 MOB P
3.75 MOB P
6.00 MOB P
3.50 MOB P
1.25 MOB P
0.00 MOB P
2.00 MOB P
0.50 MOB N
1.00 MOB P
1.25 MOB P
1.25 MOB P
0.50 RIGU P
4.00 RIGU P
1.50 RIGU P
2.00 RIGU P
2.00 RIGU P
0.50 RIGU P
1.00 RIGU P
1.25 RIGU P
1.25 BOPSUR P
1.50 BOPSUR P
2.50 BOPSUR P
2.25 BOPSUR P
1.50 KILL P
0.50 STWHIP P
0.42 STWHIP P
0.50 STWHIP P
RREP PRE
PRE
PRE
PRE
PRE
PRE
PRE
PRE
PRE
PRE
PRE
PRE
PRE
PRE
PRE
PRE
PRE
PRE
PRE
PRE
PRE
PRE
PRE
PRE
PRE
PRE
PRE
PRE
WEXIT
WEXIT
WEXIT
WEXIT
Rig Released from 15-48A @ 04:30 2/23/2002. Made general
preparations to move rig off well. RID Gen #3 & outside
equipment. Warm hydraulics on move system. Roll up tarps.
PJSM on moving rig off well.
Pull rig off well to edge of pad. Conduct post-operations pad
inspection.
PJSM. R/U & LID windwalls. R/U tilt cylinders. Scope down &
LID derrick.
PJSM. Move rig to pad entrance.
Held pre-move safety meeting with Security, tool service, CPS
& all personnel.
Move rig from DS# 15 to Oxbow, then Spine Rd.
Crew change at Pump #1. Continue move to W Pad and get to
Kuparuk east channel by 0000 hrs
Continue move from 15-48 at Kuparuk east channel
Turn off Spine onto W Pad access
Set rig down on Pad near well. Location inspection. General
prep to RU
Continue moving rig from 15-48. Now at Kuparuk River east
channel
Repair a-ring on hi-pressure filter housing.
Continue moving rig.
Turn off Spine onto W Pad access.
Set rig down on Pad near well. Location inspection. General
prep to RU.
PJSM & HA/HM on raising derrick & windwalls. Very cold day
(-56F WC) so will take our time in RU.
Raise derrick & windwalls.
Secure guy wires. Secure tilt rams in storage frame.
P/U injecter head. M/U guide arch & stab CT into injecter head.
PJSM. P/U BOP & warm drive sytem. Attend to hydraulic oil
leak on pad (Tr@ction# 2003-IR-443460).
PJSM for backing rig over well. Meanwhile bleed off 250psi
FLP.
Back rig over well & set down. Had to pump-up 1 flat front tire
before backing rig.
Accept rig @ 17:30 HRS. Spot trailers, misc equipment.
NU BOPE
WO DSM to RU cuttings box/berm. Clear floorlpipeshed of
moving tools. Grease crew pump open SSV. RU sensors to
annuli. IA 1020, OA 0
Test BOPE. Witness waived by AOGCC. Fill pits wI KCl/bio.
DSM RU flowback tank. Bleed gas off IA to 375 psi
Finish BOPE test
Chk well for press 700 psi. Liquid pack wellbore wI 300 bbls
2% KCI at avg 5.1 bpm/11 00 psi. ISIP 900, 15 min 200. IA 0,
OA 5 Load WS in pipeshed. Install 2 RA pips
Set up WS for HS exit based on 82.5L lug. WHP stable at 150
psi. SI swab (24). Bleed off S-riser from 500 psi to zero and
building press slowly. Determine lateral is holding and wing is
leaking
Install WI! CTC. PT 22k. Bleed FL to zero. Sllateral
Fill CT wI 59.6 bbls and CTC leaked
Printed: 3/10/2003 8:14:49 AM
Legal Well Name:
Common Well Name:
Event Name:
Contractor Name:
Rig Name:
)
)
Page 2 of16
BP Exploration
Operations Summary Report
W-19A
W-19
REENTER+COMPLETE
NORDIC CALISTA
NORDIC 1
Date
From - To Hours Task Code NPT Phase
2/25/2003
05:10 - 05:40
05:40 - 06:30
06:30 - 08:00
08:00 - 08:30
08:30 - 09:15
09:15 - 11 :15
11:15-11:25
11:25-11:30
11:30-13:15
13:15-13:45
13:45 - 14:15
14:15 - 16:20
16:20 - 16:50
16:50 - 18:00
18:00 -18:30
18:30 - 19:20
19:20 - 19:30
19:30-21:10
21:10-21:55
21 :55 - 22:45
22:45 - 23:20
2/26/2003
23:20 - 00:00
00:00 - 01 :20
01 :20 - 01 :35
01 :35 - 02:05
0.50 STWHIP N
0.83 STWHIP N
1.50 STWHIP N
0.50 STWHIP P
0.75 STWHIP P
2.00 STWHIP P
0.17 STWHIP P
0.08 STWHIP P
1.75 STWHIP P
0.50 STWHIP P
0.50 STWHIP P
2.08 STWHIP P
0.50 STWHIP P
1.17 STWHIP P
0.50 STWHIP P
0.83 STWHIP P
0.17 STWHIP P
1.67 STWHIP P
0.75 STWHIP P
0.83 STWHIP P
0.58 STWHIP P
0.67 STWHIP P
1.33 STWHIP P
0.25 STWHIP P
0.50 DRILL P
SFAL WEXIT
SFAL WEXIT
WEXIT
WEXIT
WEXIT
WEXIT
WEXIT
WEXIT
WEXIT
WEXIT
WEXIT
WEXIT
WEXIT
WEXIT
WEXIT
WEXIT
WEXIT
WEXIT
WEXIT
WEXIT
WEXIT
WEXIT
WEXIT
WEXIT
PROD1
Start: 2/24/2003
Rig Release: 3/7/2003
Rig Number:
Spud Date: 11/15/1998
End: 3/7/2003
Description of Operations
Cut off CTC. Rehead. PT 20k, 3500 psi. PT inner reel valve
Circ CT while WO grease crew to grease lock wing
Grease lock wing valve. Bleed off WHP to zero. Attempt to
bleed off S-riser - still building back. Call pad operator to
service or blind lateral valve. Flowcheck WHP for 30 mins -
stable. Found out that lateral valve was not fully shut. Grease
lock lateral valve & bleed S-riser to Opsi.
Held pre-operations safety meeting. Reviewed well plan,
potential hazards & BHA M/U procedures.
M/U the WS-R-BB orientation latch BHA # 1 with Weatherford
4-1/2" packer latch, 4-1/2" Weatherford whipstock, R/Tool,
Dailey up-jar & MHA. Stab injector on well. Latch pinned for
18k release while the W/S carrying sub is pinned for 9k
release.
RIH with BHA #1 to 10500' taking gassy returns to the tigger
tank.
Wt check @ 10500' = 45klbs. Continue RIH BHA#1. Latch into
WS-R-BB Pkr @ 10998'. Set down 3k.
P/U 3k over to confirm latch-up. Set back 6k. P/U to 58k (13k
over), stroke jar & shear from whipstock.
POOH with BHA #1 to taking returns to the pits.
OOH. LID W/S carrying sub & R/Tool.
M/U window milling BHA # 2 with HCC DSM, Weatherford
straight motor, string reamer, 2jts of 2-3/8" PH6 tbg & MHA.
Stab injector on well.
RIH w/ BHA #2. PT wellbore and held 966 psi for 5 min, no
change to IA
Tag XN at 10816' CTD-did not correct. PUH 50k. Start motor
2.6/1650. RIH and stall at 10813.3'. Mill XN and dress. RIH
Tag WS at 10981' at min rate. PUH 50k. Start motor. RIH
and first motor work at 10979.8'. Corr to 10945' and paint flag.
Begin milling window
10947.0' 2.6/1600 Stall
10947.3', milling ahead. IAP=386 psi, OAP=12 psi. Pit
vol=276 bbls.
10949.0', Stacking weight. Pickup to get free spin. Found at
1540 psi, 2.5 bpm.
10949.0', Resume drilling 2.5/2.5/1680 psi.
10951.2', Drilling break. ROP now 30 fph. Probable bottom of
window. Window depths 10945'-10951.2', for a 6.2' window.
Continue to drill open hole for rat hole.
Drill to a TO of 10961'. Backream window.
Finish reaming window, dry tag slick thru window, no problems.
Pump 30 bbls of 3# biozan sweep.
POH, chasing the bio sweep.
Continue POH with window milling BHA.
Tag up with BHA #2, lay down milling BHA. DSM recovered
3.79" showing little gauge wear, with proper swirl pattern on
nose indicating exit. String mill recovered under gauge at
3.68", showing gauge wear.
Prespud safety meeting with all night tour rig hands. Discuss
expected hazards and mitigation; Window mill results,
faulting/potential lost circulation, H2S, cold weather. Also
Printed: 3/10/2003 8:14:49 AM
Legal Well Name:
Common Well Name:
Event Name:
Contractor Name:
Rig Name:
W-19A
W-19
REENTER+COMPLETE
NORDIC CALISTA
NORDIC 1
Start: 2/24/2003
Rig Release: 3/7/2003
Rig Number:
Spud Date: 11/15/1998
End: 3/7/2003
2/26/2003 01 :35 - 02:05 0.50 DRILL P PROD1 discussed operations forward for run #3, the first build section
BHA, and the planned mud swap.
02:05 - 02:40 0.58 DRILL P PROD1 Make up DS CTC, Pull test to 35 klbs, Press test to 3500 psi,
ok.
02:40 - 03:40 1.00 DRILL P PROD1 Make up BHA #3, First drilling BHA. Smith M09 bit, 1.37 deg
BHI motor, Sperry MWD.
03:40 - 06:10 2.50 DRILL P PROD1 RIH with BHA #3. Shallow hole test of MWD and orienter at
3000', passed ok, continue RIH. Also swapping to used mud
system.
06:10 - 06:35 0.42 DRILL P PROD1 Tag bottom. Make -35' correction. Begin orienting to high
side. IAP=537 psi, OAP=12 psi.
06:35 - 08:30 1.92 DRILL P PROD1 Tag TD @ 10960'. Drilling 2.3/2600/12L while swapping to
used mud. Slow progress
08:30 - 09:30 1.00 DRILL P PROD1 Drilling 20'/hr 10981-11000" 2.5/3400/15L
09:30 - 09:55 0.42 DRILL P PROD1 Wiper to 10970'. Log up to tie-in to mother well at 10938'. Corr
+4.2'. RBIH
09:55 - 11 :50 1.92 DRILL P PROD1 Drill from 11404' 2.6/3440/20L Mud swap completed PVT 301.
Drill to 11036'. Having trouble keeping TF HS. Bleed IA from
900 psi to 60 psi
11 :50 - 12:05 0.25 DRILL P PROD1 Orient around
12:05-12:15 0.17 DRILL P PROD1 Drill ahead and still slow drilling. Drill to 11039'
12:15 - 13:45 1.50 DRILL N DFAL PROD1 Wiper to window. POOH for motor
13:45 - 14:50 1.08 DRILL N DFAL PROD1 Change motor, bit (0-4-1). PT CTC
14:50 - 17:00 2.17 DRILL N DFAL PROD1 RIH w/ BHA #3. SHT. RIH thru window, clean. Tag TD at
11079', corr to 11 039'
17:00 - 17:30 0.50 DRILL N DFAL PROD1 Orient around
17:30 - 17:35 0.08 DRILL P PROD1 Drilling 2.5/3350/ 10L. Drill to 11040' and drills good, but
having trouble keeping TF HS
17:35 - 18:00 0.42 DRILL N DFAL PROD1 Orient around and work w/ orientor-not locking anymore
18:00 - 18:30 0.50 DRILL N DFAL PROD1 POOH for orientor. PVT 312
18:30 - 18:50 0.33 DRILL N DFAL PROD1 Safety meeting for simops. Rig crew plans to change out fluid
end on SPM pump #1, while continuing to POH to change
BHA. Areas of discussion were heavy loads, shifting loads,
spills, slippery footing, pinch points, simops with BHA swap,
lockoutltagout, hydraulic isolation.
18:50 - 20:00 1.17 DRILL N DFAL PROD1 Continue to POH. IAP=39, OAP=22 psi. Pit vol 291 bbls (At
4300'. POH).
20:00 - 21 :30 1.50 DRILL N DFAL PROD1 Tag up at surface with BHA #4. Stand back injector, c/o MWD
probe and orienter, check bit. Found bit damaged in the same
manner as BHA #3. DD graded it as 0,3,L T,G,I. No obvious
problems with orienter, or motor.
21 :30 - 22:35 1.08 DRILL N DFAL PROD1 RIH with BHA #5; M09 bit, 1.37 deg motor. Shallow hole test
of orienter and MWD at 3500', failed. Could not get clicks with
Sperry orienter. Tried several times. BH Incl at this depth=1 0
deg.
22:35 - 23:05 0.50 DRILL N DFAL PROD1 POH with BHA #5, to replace orienter.
23:05 - 23:45 0.67 DRILL N PROD1 Tag up at surface. Troubleshoot BHA. No problems found
with orienter or equalizer sub. Change out both. Check bit.
No damage to bit from previous shallow hole test. Graded 0,0.
23:45 - 00:00 0.25 DRILL N PROD1 RIH with BHA #6.
2/27/2003 00:00 - 01 :35 1.58 DRILL N DFAL PROD1 Continue RIH with BHA #6. Shallow hole test at 3500', passed
ok. Orienter and MWD worked properly. Continue RIH.
01 :35 - 01 :50 0.25 DRILL N DFAL PROD1 Orient to high side.
Printed: 3f10f2003 8:14:49 AM
)
')
BP Exploration
Operations Summary Report
Page 4 of 16
Legal Well Name:
Common Well Name:
Event Name:
Contractor Name:
Rig Name:
W-19A
W-19
REENTER+COMPLETE
NORDIC CALISTA
NORDIC 1
Start: 2/24/2003
Rig Release: 3/7/2003
Rig Number:
Spud Date: 11/15/1998
End: 3/7/2003
Date From - To Hours Task Code NPT Phase Description of Operations
2/27/2003 01 :50 - 03:00 1.17 DRILL P PROD1 Tag bottom, make -38' correction to last tagged depth of
11040'. Pitvol=317bbls. IAP=30psi, OAP=12 psi. Free
spin=3600 psi at 2.6 bpm. Resume drilling. 2.6/2.6/3820 psi.
ROP slow in Shublik. Only making about 15 fph.
03:00 - 05:25 2.42 DRILL P PROD1 11054', ROP picking up. Now making 35 fph. 2.6/2.6/3800
psi. Pit vol=315 bbls.
05:25 - 05:40 0.25 DRILL P PROD1 11112', Orient back around to high side.
05:40 - 07:05 1.42 DRILL P PROD1 Resume drilling.2.5/2.5/4050. ROP=30 fph. IAP=210 psi,
OAP=30 psi. Pit vol=315 bbls. Drill to 11149' while getting a
little gas cut mud
07:05 - 07:50 0.75 DRILL N SFAL PROD1 PUH 40k. Circ thru pump #1 and pressure test (after new fluid
end installed). Lost CT pressure so had to orient around
07:50 - 09:40 1.83 DRILL P PROD1 Resume drilling 2.5/3550/2L 30'/hr and got some more gas cut
mud. FLP 0, IA 275, OA 32. Bleed off IA to 75 psi (all fluid).
Drill to 11207' at 84 deg
09:40 - 09:55 0.25 DRILL P PROD1 Orient around to start turn
09:55 - 10:40 0.75 DRILL P PROD1 Drill from 11207-241' 2.4/3500/90L PVT 308
10:40 - 11 :00 0.33 DRILL P PROD1 Orient around
11 : 00 - 11: 50 0.83 DRILL P PROD1 Drill from 11241-273' 2.4/3550/90L PVT 300
11 :50 - 12:20 0.50 DRILL P PROD1 Orient around
12:20 - 13:20 1.00 DRILL P PROD1 Drill from 11273-326' 2.5/3550/120L Landed at 8825' TVD in
sand at 85 deg. IA 195, PVT 300
13:20 - 13:30 0.17 DRILL P PROD1 Wiper to window
13:30-15:15 1.75 DRILL P PROD1 POOH for lateral assy
15:15 - 16:30 1.25 DRILL P PROD1 LD build assy. Change bit, adjust motor to 1.04 deg, change
MWD probe. Video crew tape "hands at work"
16:30 - 17:30 1.00 DRILL P PROD1 Upload res tool
17:30 - 18:00 0.50 DRILL P PROD1 Fin MU BHA
18:00 - 20:15 2.25 DRILL P PROD1 RIH w/ BHA #7. Shallow hole pulse test worked fine. Orienter
check ok at 4500', continue RIH. Slight bobble at window with
pumps down. Went thru ok. IAP=10 psi, OAP=10 psi. Pit
vol=293 bbls at bottom.
20:15 - 21:45 1.50 DRILL P PROD1 Tag bottom, make correction to last TD of 11326' (-40'
correction). Make MAD pass for resistivity data from TD to
window.
21 :45 - 21 :55 0.17 DRILL P PROD1 Orient to 100L.
21 :55 - 00:00 2.08 DRILL P PROD1 Begin drilling. Free spin 3500 psi at 2.6 bpm. Pit vol=293 bbls,
IAP=125 psi, OAP=20 psi. Drilling at 2.6/2.6/3850 psi.
TF=100L, ROP=50 fph.
Midnight depth = 11430'.
2/28/2003 00:00 - 01 :10 1.17 DRILL PROD1 Continue drilling from 11430'. 2.6/2.6/3760 psi. ROP=80 fph.
01:10 - 01:35 0.42 DRILL PROD1 Short trip to shoe.
01 :35 - 02:20 0.75 DRILL PROD1 Log tie in pass accross RA marker. Pulser shut down when in
window. PUH, and log tie in pass over gamma spike at 10728',
added 3'.
02:20 - 03:00 0.67 DRILL PROD1 Log secondary tie in pass over TOS at 11190'.
03:00 - 04:30 1.50 DRILL PROD1 11500', Resume drilling. 2.7/2.7/3900 psi. Pit vol=278 bbls.
04:30 - 05:20 0.83 DRILL PROD1 11568', Take a click and swap to new pump #1. Pump 1 is
noisy, repair pulsation dampener, resume orienting.
05:20 - 06:05 0.75 DRILL PROD1 Resume drilling. Free spin 3600 psi @ 2.5 bpm. Pit vol =277
bbls.
06:05 - 06:35 0.50 DRILL PROD1 11600', Ratty drilling, and started having major fluid losses.
Probably fault expected at 11650'. Current loss rate 2.2 in, 0.9
Printed: 3/10/2003 8:14:49 AM
'),
,
)
Legal Well Name:
Common Well Name:
Event Name:
Contractor Name:
Rig Name:
W-19A
W-19
REENTER+COMPLETE
NORDIC CALISTA
NORDIC 1
Start: 2/24/2003
Rig Release: 3/7/2003
Rig Number:
Spud Date: 11/15/1998
End: 3/7/2003
2/28/2003 06:05 - 06:35 0.50 DRILL PROD1 out. Continue drilling ahead, monitoring losses. Losses
appear to be slowly healing. 06: 15-2.4/1.5 Drill to 11613'
2.4/1.9/3400/70L PVT 248
06:35 - 06:50 0.25 DRILL PROD1 Orient to right
06:50 - 07:45 0.92 DRILL PROD1 Drilling ftrom 11613' 2.4/1.2/3400/70R Losses increasing due
to orienting and wiping back thru direction change due to ratty
drilling. Drill to 11645' and had overpull
07:45 - 08:05 0.33 DRILL N WAIT PROD1 Wiper to window
08:05 - 09:05 1.00 DRILL N WAIT PROD1 Park in 4-1/2" liner at 1 0924'. PVT 134 Circ over the top w/
charge pump. PUH 70' every 30 min (+1 F). WO mud (all
trucks busy)
09:05 - 10:35 1.50 DRILL N WAIT PROD1 10775' PVT 129
10:35 - 11 :00 0.42 DRILL N WAIT PROD1 10700' PVT 122 RIH (mud truck on location). Precautionary
ream to TD. Tag TD at 11645' PVT 100
11 :00 - 11 :25 0.42 DRILL N WAIT PROD1 PUH above loss zone and orient around. RIH
11:25-11:55 0.50 DRILL P PROD1 PVT 85 Drilling 2.4/1.5/3500/60R adding new mud. Drill to
11677'
11 :55 - 12:20 0.42 DRILL P PROD1 Wiper to 11600'. Orient around
12:20 - 13:30 1.17 DRILL P PROD1 Drilling 2.5/1.5/3400/30R Get drilling break at 11680' and drill
120'/hr and position to land at 8880' TVD. Drill to 11773' and
stacking. The plan is to drill ahead w/ losses. . .
13:30 -14:05 0.58 DRILL P PROD1 Wiper to window
14:05 - 14:15 0.17 DRILL P PROD1 Log tie-in down from 11225' to GR at 11192', no corr
14:15 -14:35 0.33 DRILL P PROD1 RIH to TD and tag at 11769'. Orient 1 click
14:35 - 15:00 0.42 DRILL P PROD1 Drilling 2.5/1.3/3480/60R 11 O'/hr. Drill to 11800' and
stalling-may be next fault
15:00 - 16:25 1.42 DRILL N WAIT PROD1 PUH 46k 1 O'/min while circ 0.6/0.05 bpm conserving mud while
wo more mud (no vac trucks available other than the one round
tripping and loading now) PVT 124
16:25 - 17:00 0.58 DRILL N WAIT PROD1 Park at 10950', circ, wo mud PVT 72
17:00 - 17:25 0.42 DRILL N WAIT PROD1 PVT 57 RBIH while filling pits w/ used mud. Tag TD at 11801'
17:25 -17:30 0.08 DRILL N WAIT PROD1 Orient to low side to drop to new target at 8885-90' TVD
17:30 - 18:00 0.50 DRILL P PROD1 Drilling 2.4/1.3/3500/113R 60-90'/hr. Drill to 11837'
18:00 - 18:30 0.50 DRILL P PROD1 Orient to left side
18:30-19:10 0.67 DRILL P PROD1 11857', IAP=O, OAP=O, Pit vol=240 bbls. Drilling with losses
2.6/1.4/3400 psi. Free spin 3250 psi at 2.5 bpm. Good ROP, it
is possible to drill at 120 fph. Holding back intentionally to
prevent sticking from inadiquate hole cleaning. Drilling at 60
fph.
19:10 - 20:00 0.83 DRILL P PROD1 11900', Precautionary wiper trip to shoe. 100' since last wiper.
10k Ibs overpull off bottom at pickup. PU at 50 klbs.
20:00 - 20:30 0.50 DRILL P PROD1 Resume drilling Pit volume = 140 bbls. Truck with mud has left
MI. Plan to drill until there is 100 bbls in pits then pull to shoe
to wait on mud.
20:30 - 21: 15 0.75 DRILL N WAIT PROD1 11925', 100 bbls left in pits. Wiper trip to shoe to standby on
mud. 10k overpull off bottom.
21 :15 - 23:30 2.25 DRILL N DPRB PROD1 Confer with town engineer. Plan forward is to pump Bentonite
cement to stop losses in zone at 11600'. POH for cement
nozzle.
23:30 - 00:00 0.50 DRILL N DPRB PROD1 Tag up at surface. Stand back injector, read MWD Res tool,
lay down BHA.
3/1/2003 00:00 - 00:45 0.75 DRILL N DPRB PROD1 Continue laying down BHA #7. Recovered bit graded at 0,1 ,
with no apparent damage.
Printed: 3/10/2003 8:14:49 AM
')
')
Legal Well Name: W-19A
Common Well Name: W-19 Spud Date: 11/15/1998
Event Name: REENTER+COMPLETE Start: 2/24/2003 End: 3/7/2003
Contractor Name: NORDIC CALISTA Rig Release: 3/7/2003
Rig Name: NORDIC 1 Rig Number:
From-To
3/1/2003 00:45 - 01 :15 0.50 DRILL N DPRB PROD1 MU BHA #8, Nozzle and stinger for cement job. Note, nozzle
is a combo dump/JSN. It has 1 0.68 bottom hole and 8 side
and down 1/8" swirlports. Dropping a 13/16" ball after the
cement job will convert it into a JSN for the cleanout.
01 :15 - 03:00 1.75 DRILL N DPRB PROD1 RIH with Cementing BHA. Thru window slick.
03:00 - 03:15 0.25 DRILL N DPRB PROD1 Kick pumps on at window. 3.5/1.8/2750 psi. RIH to bottom to
clean cuttings prior to pumping cement.
03: 15 - 03:45 0.50 DRILL N DPRB PROD1 Tag bottom, make -40' correction, PUH at 30 fpm, pumping at
3.6/2.0 to clean hole.
03:45 - 04:00 0.25 DRILL N DPRB PROD1 Safety meeting with cementers, rig crew, Peak vac truck driver
re cementing, hazards, mitigation, and proceedures.
04:00 - 04:30 0.50 DRILL N DPRB PROD1 Circulate above window. 3.6/2.4/2670 psi. Waiting on
cementers.O
04:30 - 05:45 1.25 DRILL N DPRB PROD1 Pump 2 bbls of water to warm cementers lines. PT lines to
3900 psi, all passed ok. Open to reel. Pump 10 bbls neat 13.8
Ib bentonite cement, 17 bbls cmt + 15 #/bbl aggregate, 3 bbls
neat bentonite cement tail. Follow with 5 bbls water spacer.
Swap to rig pumps, and displace cement to nozzle with mud.
Displaced @ 2.1 in, 1.1 out. Cement at nozzle, layed in from
TD (11925') at 1 for 1. Stopped at 11550', 50" above loss zone
and SI returns. Bullheaded cement away. Got 5.7 total bbls
of cement into loss zone, including 2 bbls of aggregate cement,
for a 1000 psi squeeze. Slowly bled off pressure, and layed in
remaining cement 1 for 1 while PUH to safety depth of 9600'.
CIP at 05:45.
05:45 - 06: 1 0 0.42 DRILL N DPRB PROD1 Stop at safety depth. Drop ball to make cement dump nozzle
into a JSN. Chase with 1.5#/bbl biozan gel.
06:10 - 06:55 0.75 DRILL N DPRB PROD1 RIH pumping biozan to contaminate cement and clean up.
Clean out cement to 11300'. (Thru build section). Wash
whipstock area several times.
06:55 - 09:00 2.08 DRILL N DPRB PROD1 POOH jetting 3.0 bpm. Jet stack
09:00 - 09:20 0.33 DRILL N DPRB PROD1 LD cementing assy
09:20 - 11 :30 2.17 DRILL N DPRB PROD1 Displace 1000' CT w/ water, safety mtg re: cut CT. Cut off 500'
CT for pipe management. Rehead w/ DS CTC. PT 35k, 3500
psi
11:30 -13:15 1.75 DRILL N DPRB PROD1 MU drilling BHA (new motor, same bit). Upload res tool. Fin
MU BHA
13:15-15:10 1.92 DRILL N DPRB PROD1 RIH w/ BHA #8
15:10 -15:35 0.42 DRILL N DPRB PROD1 RIH thru window, clean. Corr -40' at 11140'. Precautionary
ream to tag at 11310' 2.5/2.5/3000/37L. Cement comp str=700
psi
15:35 - 15:55 0.33 DRILL N DPRB PROD1 Orient around to drilled TF
15:55 - 17:25 1.50 DRILL N DPRB PROD1 Drill firm (for bentonite) cement 2.5/2.5/3000/120L 200-300'/hr
w/150-200 psi diff PVT 301
17:25 - 17:35 0.17 DRILL N DPRB PROD1 Full returns to 11591' PVT 299 Orient around to right side
17:35 - 18:00 0.42 DRILL N DPRB PROD1 Drill firm cement 2.5/2.5/3100/74R from 11591'. Start losing
0.1 bpm at 11615'. Drill to 11624' and had overpull
18:00 - 19:00 1.00 DRILL N DPRB PROD1 Wiper. Overpulls @ 11340',11260'. Smooth back in hole, until
11570', hung up then bounced thru, clean down to bottom at
11624'.
19:00 - 19:30 0.50 DRILL N DPRB PROD1 11624', Resume drilling. Free spin 3030 psi at 2.5 bpm.
Drilling at 2.5/2.5/3700 psi. Pit vol=275 bbls. IAP=O, OAP=O.
Pushing on it to stay in old wellbore.
Printed: 3/10/20038:14:49AM
')
')
Legal Well Name:
Common Well Name:
Event Name:
Contractor Name:
Rig Name:
W-19A
W-19
REENTER+COMPLETE
NORDIC CALISTA
NORDIC 1
Start: 2/24/2003
Rig Release: 3/7/2003
Rig Number:
Spud Date: 11/15/1998
End: 3/7/2003
Code .··NPT
DPRB PROD1 11653', Drilling ahead. Some question about whether we are
still in original well bore or not. Survey information at 11617'
was inconsistent from first wellbore. It appears that we may
have sidetracked.
Pick up to repeat surveys up to 11500'. Surveys at 11634' and
11641' confirms that we are sidetracked. Check old surveys
against new ones, and find that we sidetracked at 11562'.
Orient to 80R.
Resume drilling new hole. Pit vol=252 bbls at 20:40. Lost 25
bbls in last hour. Drilling at 2.7/2.5/3550 psi. TF=80R.
Getting lots of reactive torque. 2.4/2.3/3200 psi, 80 fph. 229
bbls pit vol. loosing about 15 bbl/hr.
Wiper trip up 0 shoe. Clean PU off bottom at 38 klbs. Clean to
shoe, and back in the hole.
Orient to 30L.
Resume drilling. Free spin 3050 psi at 2.6 bpm. Drilling at
2.6/2.4/3350 psi. Pit vol=211 bbls. Getting 120 deg reactive!.
11800', Continuing to drill ahead. IAP=O, OAP=14 psi,
2.5/2.2/3280. Pit vol=192 bbls.
11858', Swapping to new mud. Continue drilling ahead.
2.6/2.3/3200 pai. TF=40L. Wether conditions worsening.
Currently 22 gusting 35 mph. Phase 1.
11925', Wiper trip to shoe. Clean off bottom, and thru window.
Orient to 90L
Resume drilling. Pit vol=184 bbls, (Still taking on mud).
Orient 2 clicks.
Resume drilling. Pit vol=270 bbls at 04:30. All new mud on
board.
11964', orient again, having trouble holding tool face.
Resume drilling.
Orient 2 clicks
Resume drilling.
Orient 2 clicks. Tool face keeps falling off, and we are also not
getting all the clicks from the orienter.
Resume drilling. 2.6/2.4/3100 psi. Pit vol=265 bbls @ 05:00.
12060', take 1 click. Pit vol=245 bbls, IAP=O, OAP=7.
Resume drilling. 2.5/2.3/3300 psi. Drill to 12147' 70L-30L
Stacking and overpulling
Wiper to window
Log tie-in up from 11010' to RA pip. Add 11.0'
Wiper to TD tagged at 12151', clean
Orient to right side
Drilling 2.5/2.3/3000/10-70R w/ +7k Geo wants to come up to
94 deg since looking wet. Drill to 12200' with neg wt/overpull
2-100' wipers w/ set downs/overpulls at 12165' and 12188'.
Wiper to 12000', RIH, clean. PVT 164
Drilling 2.5/2.3/3000/ 90R Drill to 12245' at 95 deg. Rather
ratty last 5', then lost all returns
PUH heavy due to well on a good suck-lost 800 psi CT press
too! Wiper to window. Start getting partial returns above
11900', then 2.5/0.7/2500 at 11500'
Park at 10980' and check returns 2.5/1.1/2650/27R Wiper in
hole to resume drilling
From- Tb
3/1/2003
19:30 - 19:45
0.25 DRILL N
19:45 - 20:30 0.75 DRILL N DPRB PROD1
20:30 - 20:40 0.17 DRILL N DPRB PROD1
20:40 - 22:10 1.50 DRILL N DPRB PROD1
22:10 - 22:15 0.08 DRILL N DPRB PROD1
22: 15 - 22:50 0.58 DRILL N DPRB PROD1
22:50 - 23:10 0.33 DRILL N DPRB PROD1
23:10 - 00:00 0.83 DRILL N DPRB PROD1
3/2/2003 00:00 - 01 :00 1.00 DRILL N DPRB PROD 1
01 :00 - 02: 15 1.25 DRILL N DPRB PROD1
02: 15 - 03:20 1.08 DRILL P PROD1
03:20 - 03:30 0.17 DRILL P PROD1
03:30 - 04:00 0.50 DRILL P PROD1
04:00 - 04: 15 0.25 DRILL P PROD1
04: 15 - 04:30 0.25 DRILL P PROD1
04:30 - 04:40 0.17 DRILL P PROD1
04:40 - 04:45 0.08 DRILL P PROD1
04:45 - 04:55 0.17 DRILL P PROD1
04:55 - 05:00 0.08 DRILL P PROD1
05:00 - 05:05 0.08 DRILL P PROD1
05:05 - 06:05 1.00 DRILL P PROD1
06:05 - 06: 1 0 0.08 DRILL P PROD1
06:10 - 07:15 1.08 DRILL P PROD1
07:15 - 07:45 0.50 DRILL P PROD1
07:45 - 08:05 0.33 DRILL P PROD1
08:05 - 08:45 0.67 DRILL P PROD1
08:45 - 09:00 0.25 DRILL P PROD1
09:00 - 09:45 0.75 DRILL P PROD1
09:45 - 10:30 0.75 DRILL P PROD1
10:30 -10:55 0.42 DRILL P PROD1
10:55-11:35 0.67 DRILL P PROD1
11:35-12:15 0.67 DRILL P PROD1
Printed: 3/10/2003 8:14:49 AM
")
)
Legal Well Name:
Common Well Name:
Event Name:
Contractor Name:
Rig Name:
W-19A
W-19
REENTER+COMPLETE
NORDIC CALISTA
NORDIC 1
3/2/2003
12:15 - 12:45
F'rom~"ö Hours Task Code N PI Phase
PROD1
12:45 -12:50
12:50 - 13:15
13:15 - 14:10
14:10 - 14:45
14:45 - 15:05
15:05 - 15:30
15:30 - 16:20
16:20 - 17:30
17:30 - 18:15
18:15 - 18:30
18:30 - 18:40
18:40 - 18:50
18:50 - 19:00
19:00-19:10
19:10 - 19:20
19:20 - 19:30
19:30 - 19:40
19:40 - 19:55
19:55 - 20:05
20:05 - 20:10
20: 1 0 - 20:40
20:40 - 20:45
20:45 - 21 :40
21 :40 - 23:00
23:00 - 00:00
3/3/2003
00:00 - 00:50
00:50 - 02:00
02:00 - 02: 15
02:15 - 05:10
0.50 DRILL P
0.08 DRILL P
0.42 DRILL P
0.92 DRILL P
PROD1
PROD1
PROD1
0.58 DRILL P
0.33 DRILL P
0.42 DRILL P
0.83 DRILL P
1.17 DRILL P
PROD1
PROD1
PROD1
PROD1
PROD1
0.75 DRILL P
0.25 DRILL P
PROD1
PROD1
0.17 DRILL P
0.17 DRILL P
PROD1
PROD1
0.17 DRILL P
0.17 DRILL P
PROD1
PROD1
0.17 DRILL P
0.17 DRILL P
PROD1
PROD1
0.17 DRILL P
0.25 DRILL P
0.17 DRILL P
0.08 DRILL P
0.50 DRILL P
0.08 DRILL P
0.92 DRILL P
PROD1
PROD1
PROD1
PROD1
PROD1
PROD1
PROD1
1.33 DRILL P
PROD1
1.00 DRILL N
DPRB PROD1
0.83 DRILL N
1.17 DRILL N
DPRB PROD1
DPRB PROD1
0.25 DRILL N
DPRB PROD1
2.92 DRILL N
DPRB PROD1
Start: 2/24/2003
Rig Release: 3/7/2003
Rig Number:
Spud Date: 11/15/1998
End: 3/7/2003
Tag TD at 12239' and stall. Resume ratty drilling
2.5/1.3/3000/94R for 5'. Start making good hole again and
returns improved to 2.6/1.8/31 00/97R after drilling 30'. Drill to
12285'
Wiper to 12100' to test the waters, clean
Orient around at 12100'. RBIH
Drilling 2.5/1.7/3000/70R holding 94 deg. Drill to 12333' and
having trouble bringing TF down
Wiper to window
Log tie-in up from 11010'. Add 9.0'
Reboot DS PC 0.6/0.2/1230. Check orientor w/ 2 clicks
Wiper to TD tagged at 12338', clean. Orient 1click
Drilling 2.6/1.9/3200/132R from 12338' See incl get to 98 deg
and start to knock back down to 94 deg, then want 90 deg. Still
looking wet. Drill to 12413' 2.5/2.0/3050 and have 90 deg at bit
PVT 300
Orient around-orientor doesn't seem to be locking
Tag btm, drill 2' to 12415' and start losing fluid again
2.4/1.2/2500/141 L. Assume next 'planned' fault. Continue
trying to orient around to 70R
12416', orienting.
Resume drilling, Free spin=3000 psi at 2.6 bpm. Drilling at
2.6/1.4/3420 psi.
Short wiper up 200'. Clean PU at 38 klbs.
Orient to 70R. Having to orient more than shown here on
DIMS. Every time we pick up for 1 click, we break down the
most recent loss zone. After orienting losses are 2.6/1.3. It
does heal slightly to 1.5 out after a period of time. Got 2
trucks round tripping mud.
Drill to 12430'.
Take a click. (Jez! we are doig lots of orienting. Not helping
our losses much.) IAP=O, OAP=O, Pit Vol=200 bbls. Need
mud in the next hour.
12437', drill ahead. 2.6/1.4/3500 psi.
12440', Orient to left side.
Resume drilling 80L.
Orient 1 click.
12446', Resume drilling. 2.6/1.5/3500 psi.
12478', Tool face popped up to 0 deg. Orient around.
Resume drilling 2.6/1.6/3500 psi. Pit vol=94 bbls, new mud
Vac truck #1 on location.
12514', wiper trip to shoe. Called town to notify engineers of
loss rate and options. Currently loosing about 100 bbl/hr of
mud. No used mud available at MI. Will need to continue
round tripping vac trucks if it is decided not to treat losses.
Confirm plan forward of treating loss zone with Anchorage.
POH.
POH for bentenite cement LCM treatment.
Tag up at surface, read MWD tool, lay down drilling BHA, bit
graded 0,1.
MAke up BHA #10, 3" Combo cement dump/JSN nozzle
(13/16" ball), stinger, x/o, CTC.
RIH with BHA #10 to pump LCM/bentonite cement treatment.
Printed: 311012003 8:14:49 AM
')
Legal Well Name:
Common Well Name:
Event Name:
Contractor Name:
Rig Name:
3/3/2003
02:15 - 05:10
05: 1 0 - 06:05
06:05 - 06:30
06:30 - 06:55
06:55 - 07:35
07:35 - 07:50
07:50 - 09:25
09:25 - 09:45
09:45 - 15:30
15:30 - 16:30
16:30 - 17:20
17:20 - 19:20
19:20 - 20:15
20:15 - 20:30
20:30 - 20:35
20:35 - 20:40
20:40 - 20:47
20:47 - 21 :20
21 :20 - 21 :30
)
BP Exploration
Operations Summary Report
W-19A
W-19
REENTER+COMPLETE
NORDIC CALISTA
NORDIC 1
Start: 2/24/2003
Rig Release: 3/7/2003
Rig Number:
Spud Date: 11/15/1998
End: 3/7/2003
HoUrs
2.92 DRILL N
0.92 DRILL N
0.42 DRILL N
0.42 DRILL N
0.67 DRILL N
0.25 DRILL N
1.58 DRILL N
0.33 DRILL N
5.75 DRILL P
1.00 DRILL N
0.83 DRILL N
2.00 DRILL N
0.92 DRILL N
0.25 DRILL N
0.08 DRILL N
0.08 DRILL N
0.12 DRILL N
0.55 DRILL N
0.17 DRILL N
DPRB PROD1
DPRB PROD1
DPRB PROD1
DPRB PROD1
DPRB PROD1
WAIT PROD1
DPRB PROD1
DPRB PROD1
PROD1
DPRB PROD1
DPRB PROD1
DPRB PROD1
DPRB PROD1
DPRB PROD1
DPRB PROD1
DPRB PROD1
DPRB PROD1
DPRB PROD1
DPRB PROD1
Clean thru window, pumping 3.7 in, 2.7 out while RIH. Hung
up/bounced thru at 11650', Sat down at 12316'. Solid tag.
Pickup/set down several times. Set down at same depth each
time. Set down several more times. PU heavy. Move free up
to 12270'. Started pulling heavy and packing off. RIH, pump at
3.6/2.1, continue PUH slowly circulating and work back up.
Appear to have some junk (cuttings?) above us. Got free, try
to run back in. Still there. Need to chase it back to the shoe.
PUH pumping 3.6 bpm. Pulling at 20 fpm. Pulling ratty.
Appear to have debris/cuttings above us. Pulled ratty to
11,950'. Hung up at window. Pulled through with 10K over
pull.
RIH to pump cement. IAP=O, OAP=O, Pit vol=210 bbls. 165
bbls on vac truck. Clean down then back up thru window, no
overpulls.
RIH thru open hole, clean and still solid at 12315'
PUH 43k 2.5/1.4/1840 and see overpulls at 12245' loss zone,
11945',11675-600', window was clean, PUH to 10500'
Park at 10500' 0.9/0.2/1000 while cuss 'n discuss. Will
cleanout before cementing
POOH
LD cement assy
Weekly BOPE test-witness waived by AOGCC
Fill hole w/ 4 bbls. Cut off CTC and cut off 8' CT. Install DS
CTC. PT 35k, 3500 psi. PT inner reel valve. Wave at N2 and
wish good luck
MU drilling BHA (w/o res)
RIH w/ BHA #11 SHT Plugged 'out' MM on orientor test. Tear
it down and find pieces of hydril rubber. Continue RIH.
Kick pumps on, 2.6/1.5. Same loss rate as previous runs.
Continue RIH. IAP=O, OAP=O, Pit vol=310 bbls. RIH smooth
thru window, in open hole thru 11600'. Hung up/popped thru at
11950', smooth down to 12316', hung up and could not get
thru. PU right away, Drop down at 0.4 bpm and try again. No
success. Try with pumps down, 2 times with no success.
Don't want to mess about and sidetrack.
Orient to to high side.
Pumps down, RIH. Set down at 12316'.
Orient around to 40R.
RIH dry, set down again at 12316'. Pickup to check TF, still
46R. (Original TF was 60 to 70R when drilled). Drop pumps
to minimum, set down again at the same depth. Kick pumps
on. TF= 38R. Can't get thru, pickup quickly.
Take a click. TF=52R. Free spin 3150 psi at 2.5. Drill ahead 2
, at 200 fph, then popped thru. Got junk along side of us.
Make it to 12320', then backream. Pumping 2.5/1.4. Got a
15k overpull, then free. Continue working thru made it to
12324', pulled up stuck. Pull to 80 klbs. Held 2 minutes,
popped free. Geo reports this light colored/white clay could be
running on us. Call Mud man for max claygard. Currently at
8#, going to 14.
Continue to ream shale at 12316'. It is grabby, and we are
getting clay packing off above us as we work. The clay is
Printed: 3/10/2003 814:49 AM
")
'}
Legal Well Name:
Common Well Name:
Event Name:
Contractor Name:
Rig Name:
W-19A
W-19
REENTER+COMPLETE
NORDIC CALISTA
NORDIC 1
Start: 2/24/2003
Rig Release: 3/7/2003
Rig Number:
Spud Date: 11/15/1998
End: 3/7/2003
3/3/2003 21 :20 - 21 :30 0.17 DRILL N DPRB PROD1 getting bad on us. Continue working it. Geo reports that this is
the 45N shale, which coincidentally, is the same shale we
inadvertantly sidetracked in at 11562'!
21 :30 - 21:40 0.17 DRILL N DPRB PROD1 Toolface now 30R, orient back to 50R. Only getting 10 degree
clicks.
21 :40 - 22:00 0.33 DRILL N DPRB PROD1 Continue to ream shales. TF=44R, Pit vol=214 bbls. Free
spin 3280@2.5 bpm. Keep getting thrown to left side. Pick up
and it falls back to our normal 45R TF.
22:00 - 22:05 0.08 DRILL N DPRB PROD1 TF keeps wanting to flop around to left side. Take 2 more
clicks to the right.
22:05 - 20:20 22.25 DRILL N DPRB PROD1 Continue working bad spot, doing our best not to sidetrack.
Getting big tool face change at bad spot from 50R to 90L.
Finally made it thru. Set down on obstruction at 12422' (lower
thief zone). Saw motor work and solid tag. Losses have
improved, since starting out. 2.5/2.1 now. Probably have
clayballs from above packing off in loss zone.
20:20 - 22:45 2.42 DRILL N DPRB PROD1 12375', Orient to 1 OOR to drill thru obstruction.
22:45 - 22:55 0.17 DRILL N DPRB PROD1 Hung up while orienting, Kick pumps on. 2.6/0.6. Packed off
up above us. Cycled pump, popped free, still low returns. Try
to work back out of hole. Cycleing pumps and working pipe to
break packoff.
22:55 - 23:30 0.58 DRILL N DPRB PROD1 Adding claygard to system. To bring it up to 14#. Still have
junk above us, still stuck. Returns improving slightly 2.8/1.6.
Finally able to PUH with much difficulty, lots of overpulls and
packing off.
I think the hole is starting to talk to us.
Pulled above 12,315 and started pulling better, but still a little
ratty. Pulling cuttings up hole.
23:30 - 00:00 0.50 DRILL N PROD1 Wiper trip to the window with a load of
clay/cuttings/debris/mung. Chasing it the whole way.
3/4/2003 00:00 - 01 :05 1.08 DRILL N DPRB PROD1 Continue wiper trip chasing boogers the entire way.
Sometimes packing off, sometimes loosing more returns,
sometimes hanging up and having to RIH 50'. Pulling heavy
and ratty. Returns 2.6/1.4 when not packing off, 2.6/.03 when
packing off. Seems apparent to us that we are chasing
something OOH. Probably sloughing clay from the problem
area at 12316'.
01 :05 - 02:15 1.17 DRILL N DPRB PROD1 Pump 30 bbl SAP pill to attempt to disperse clay above us.
Geo caught sample of bottoms up at 12316', and confirms it is
the white hydrating clay that is causing us problems.
Overpulls at window. Had to make several trips up and down
thru window to clean it up.
02:15 - 03:10 0.92 DRILL N DPRB PROD1 11275', Make tie in pass up. Make +20' correction.
03:10 - 03:45 0.58 DRILL N DPRB PROD1 Wipe back thru window.
03:45 - 04:30 0.75 DRILL N DPRB PROD1 RIH to get another bite. Clean down thru window, bounced thru
the 11560-11600 interval. Set down hard at 11950'.
04:30 - 04:45 0.25 DRILL N DPRB PROD1 Orient to 90L, which is the angle the hole was drilled. Try to
get down several times, can't get down, and get motor work at
each set down. Orient 2 more clicks to 21 L, and continue to
work pipe. Finally got thru it. Another ledge or clay ball to
Printed: 3/10/2003 8:14:49 AM
'),
')
Legal Well Name: W-19A
Common Well Name: W-19 Spud Date: 11/15/1998
Event Name: REENTER+COMPLETE Start: 2/24/2003 End: 3/7/2003
Contractor Name: NORDIC CALISTA Rig Release: 3/7/2003
Rig Name: NORDIC 1 Rig Number:
Hours
3/4/2003 04:30 - 04:45 0.25 DRILL N DPRB PROD1 worry about.
04:45 - 05: 15 0.50 DRILL N DPRB PROD1 Continue to RIH. Ratty below 12316', but did get thru it ok.
Tag up at 12440'.
05:15 - 05:30 0.25 DRILL N DPRB PROD1 Orient to 90L which we drilled this portion of the hole originally.
Currently pumpin 2.7, getting back 2.1. The loss rate has
improved. At least the clay balls are finding the thief zones and
helping us out.
05:30 - 06:00 0.50 DRILL N DPRB PROD1 Continue working in hole to 12,516'. Tight in shale section
from 12,420' - 12,450'.
06:00 - 07:00 1.00 DRILL N DPRB PROD1 POH from 12,516'. Hole conditions ratty, but better than last
trip. Kla-gard helping???
07:00 - 08:00 1.00 DRILL N DPRB PROD1 Work to get back thru window with bit. Wiper to 10900'. RBIH
and wiper to TO. Set down at 11560', 11960' 2.4/1.9/3180
08:00 - 08:25 0.42 DRILL N DPRB PROD1 Set down at 12445', PUH and sticky. Wiper to 12200' was
sticky first 150'. Wiper to TO and a little rough thru 12440-460',
but get thru and tag TO at 12524' CTD. Corr to 12516'
08:25 - 08:55 0.50 DRILL N DPRB PROD1 Wiper to 12200', clean on backream. Set down at 12310' on
RIH, work thru and RIH to TO 2.5/2.0/3170
08:55 - 09: 1 0 0.25 DRILL N DPRB PROD1 Orient
09:10 - 10:15 1.08 DRILL P PROD1 Drill ahead from 12516' 2.5/1.7/3140/70L Losses increasing
due to orienting. Drill to 12578' and need to orient
10:15 -11:05 0.83 DRILL P PROD1 Wiper to window to test the water, quite clean!
11 :05 - 11 :25 0.33 DRILL P PROD1 Log tie-in up from 10995' 2.2/1.6/3120/1 L Add 5.0'
11 :25 - 12:20 0.92 DRILL P PROD1 Swap to pump #2, then back to #1. Traction motor vibration
problem. RIH, clean to 12310'. Ream thru at 7'/min. RIH
12:20 - 12:30 0.17 DRILL P PROD1 Log tie-in down from 12490' (to add GR missed by dropping res
tool)
12:30 - 15:00 2.50 DRILL P PROD1 Orient 1 click. Drill from tag at 12581' 2.6/2.0/3500/70L to
maintain 92 deg. Getting 180 deg reactive. Drill
2.6/1.8/3500/60-90L to
15:00 - 16:40 1.67 DRILL P PROD1 12701', Make wiper trip to shoe. Clean PU off bottom at
40klbs. IAP=O, OAP=O, Pit vol=196 bbls. Trip was smooth to
shoe. While RIH, set down/popped thru at 11600', at 11925',
11955'. Solid set down at 12316'. PU/SD several times with
no success. Not grabby like last night, but still can't get thru it.
PU to orient.
16:40 - 17:00 0.33 DRILL P PROD1 12316, PU and orient to 90R. This is TF it was drilled at.
17:00 - 17:45 0.75 DRILL P PROD1 Tried to get thru bad spot, set down. Work area, and can't get
thru. PU, take a couple of clicks, RIH with TF @140R, can't
get thru. Try hitting it fast, can't get thru. Try taking a couple of
more clicks, and so on. Try at 169R, 156L, 116L, 74L, 44L, 0,
49R, all unsuccessful.
17:45 - 18:30 0.75 DRILL P PROD1 Can not get back thru washed out shale at 12316'. This
section was drilled with 90R TF. Orient to 90R, and try to clean
up hole.
Call town, inform them that there is a very good posibility that
we will sidetrack the well here, and that there is a chance at
future problems at this depth even if we do sidetrack.
Continue to work hole. Pickups are clean. Working at 90R,
but tool face keeps walking over to high left.
18:30-19:15 0.75 DRILL P PROD1 12328.5', We sidetracked at 12316'. Drilling new hole, trying to
Printed: 3/10/2003 8:14:49 AM
)
')
BP Exploration
Operations Summary Report
Page 12 of 16
Legal Well Name: W-19A
Common Well Name: W-19 Spud Date: 11/15/1998
Event Name: REENTER+COMPLETE Start: 2/24/2003 End: 3/7/2003
Contractor Name: NORDIC CALISTA Rig Release: 3/7/2003
Rig Name: NORDIC 1 Rig Number:
Froll1- To
3/4/2003 18:30 - 19:15 0.75 DRILL P PROD1 intercept old wellbore. Adjusting TF as called for by DD to hit
old WB. Cross your fingers.
Drill to 12,350'. Did not find old well bore. Stop short of fault at
approx.12,415'.
19:15 - 20:45 1.50 DRILL P PROD1 Orient to 40 deg. RT. Back ream through shale from 12,345' to
12,300'. TF fell to 110 RT. RIH pumping minimum rate to
confirm clean access through shale and tag at 12,345'. Pick
up to 12,290', no over pulls. RIH pumping minimum rate and
tag at 12,350', no problems RIH. Pick up to 12,280'. No over
pulls.
20:45 - 22:35 1.83 DRILL P PROD1 Drill ahead from 12,350', 2.6/1.9/3800 psi, 134R. Drill to
12,403'. Loss rate increased to 2.1 bpm. Drill to 12,408'.
22:35 - 23: 1 0 0.58 DRILL N DPRB PROD1 Reduce pump rate and POH. Pulling ratty from 12,000' to
11,500', 10K - 30K over pulls. Pulled clean from 11,500' to
window.
23: 1 0 - 00:00 0.83 DRILL N PROD1 Pull into casing and circulate at minimum rate and wait on mud.
3/5/2003 00:00 - 00:30 0.50 DRILL N DPRB PROD1 Wait on mud.
00:30 - 01 :30 1.00 DRILL N DPRB PROD1 RIH to 11,260'. Log up to tie in. +17' correction. Pumping 2.2
bpm in / returns 0.5 bpm.
01 :30 - 02:00 0.50 DRILL ·N DPRB PROD1 RIH. Set down at 11,560'. Pick up and go down through. RIH.
Slow pump to 0.2 bpm at 12,290'. Go through sidetrack
interval without problems. Slight bobble at 12,325'. Continue
RIH. Tag at 12,417'.
02:00 - 03:00 1.00 DRILL P PROD1 Orient to 87R. Drill, 2.3 bpm in, 0.8 bpm out, 3400 psi. Drill to
12,450'.
03:00 - 04:30 1.50 DRILL P PROD1 Orient to 82L. Drill, 2.4/1.0/3480 psi. 46 fph. 3,180 psi off .
bottom. Increase WOB. ROP increased to 100 fph, 3,760 psi
on bottom. Drill to 12,491'.
04:30 - 04:40 0.17 DRILL P PROD1 MWD not pulsing up surveys on the fly. PU off bottom and
take survey.
04:40 - 05:15 0.58 DRILL P PROD1 Drill ahead from 12,491'. 2.5/1.0/3,500 psi, 74L. ROP=94
fph.On the fly surveys returned at 12,515'. Drill to 12,550'.
05:15 - 06:50 1.58 DRILL P PROD1 Wiper trip from 12,550' to window. Pumping 2.3 bpm in, 0.9
bpm out. Slight bobble at 12,445' (Changed TF here while
drilling from 90R to 90L). No other problems while POH. RIH.
While RIH weight bobbles at 11560',11650',11950', and at
sidetrack at 12316'. Smooth to bottom from therre.
06:50 - 07:45 0.92 DRILL P PROD1 RIH returns 2.4/1.0, Take 1 click and returns went to O. Begin
drilling, 2.7 in/0/3425 psi. Returns coming back very slowly.
IAP=O, OAP=, Pit vol=282 bbls. Currrently unloading vac truck
of new mud. Another Vac truck is loading at MI. Plan to drill
ahead and RT mud trucks.
07:45 - 07:55 0.17 DRILL P PROD1 12594', Returns 2.7 in/0.7 out. Orient 1 click to maintain angle.
PU was nice and clean, no problems.
07:55 - 08:45 0.83 DRILL P PROD1 Drill ahead 2.7/0.7
08:45 - 08:50 0.08 DRILL P PROD1 12646', Take a click to maintain angle. Clean PU off botom.
08:50 - 09:15 0.42 DRILL P PROD1 Resume drilling 2.7/0.7, good weight transfer. Drilling with
+12000 Ibs weight at surface.
09:15 -11:00 1.75 DRILL P PROD1 12675', wiper trip to shoe. Clean PU off bottom. Pit level 201
bbls. Smooth up to 10200', slight motor work and over pull
Printed: 3/10/2003 8:14:49 AM
)
')
Legal Well Name:
Common Well Name:
Event Name:
Contractor Name:
Rig Name:
W-19A
W-19
REENTER+COMPLETE
NORDIC CALISTA
NORDIC 1
Task
3/5/2003
09: 15 - 11 :00
1.75 DRILL P
11:00-11:30
0.50 N
11 :30 - 12:45
1.25 DRILL N
12:45 - 13:25
0.67 DRILL N
13:25 - 13:40
0.25 DRILL N
13:40 - 14:05
14:05 - 14:30
0.42 DRILL N
0.42 DRILL N
14:30 - 16:40
2.17 DRILL N
16:40 - 17:45
1.08 DRILL N
17:45 - 18:30
18:30 - 19:45
0.75 DRILL P
1.25 DRILL P
Start: 2/24/2003
Rig Release: 3/7/2003
Rig Number:
Spud Date: 11/15/1998
End: 3/7/2003
Description of Operations
PROD1 there. Might be cuttings bed. Chase it up to window. RIH,
Set down at 11560', could not get thru, while pumping 0.4 bpm.
Try pumps down, set down again. PU kick on pumps orient to
90L (Drilled tool face). RIH, hung up and bounced thru. Hung
up/bounced thru 11630', continue RIH.
DPRB PROD1 Hung up at 11962' while RIH pumping at 0.4 bpm. SI pumps,
and can't get thru. Kick on pumps, orient to 85L (Originally
drilled at 60L). Set down again. Finally popped thru, then set
down at 11951', pick up, orientto high side.
DPRB PROD1 11935', can't get down. SI pumps, work up and down trying to
get past spot. PU, kick on pumps, orient to high side. RIH
dry. Made it to 11962', set down again. Repeated pickups/set
downs. PU above shale orient to 50L. RIH with pumps at 0.4
to lock the orienter, but not drill. Set down at 11955'. Work it
and can't get thru. PU above shale and kick pumps on.
TF=44L, RIH with pumps at 0.4 bpm. Set down at 11955'
several times. PU, orient to 15L. RIH, tagged up at 11955'
again.
Same situation as yesterdays inadvertant sidetrack. Try every
possible tool face to find hole. Orient around the clock at
different tool faces, RIH with pumps at 0.4 bpm, and see if we
can get thru at each different tool face. Try at 15L. 25R, 60R,
100R, 175R, 145L, 100L, 60L, 30L.
Pick up and run at it at 100 fpm. Hit, sat on it for 30 seconds,
and it eventually eased thru.
DPRB PROD1 There is no way we would get thru this with liner. Need to
clean this up. Kick on pumps to back ream. Hold 40L TF.
Backream bad interval 11975-11930'. 80 fph. Pumping 2.7/1.0
DPRB PROD1 Try RIH with TF at 40L. Hung up and can't get down. PU and
RIH at 100 fpm. Can't get down. Try several times at 100 fph.
Hanging up at same spot, 11962'. Finally popped thru. Whew,
it is getting difficult.
DPRB PROD1 Backream 11975'-11940'. TF=15L. 2.6/0.8. 80 fph.
DPRB PROD1 Try to get down, can not. PU 100' and run at it. Hard tag.
Can't get thru using the techniques that worked earlier. Try
several times. No success.
Can't get back into hole, despite 2 backreaming runs. Call
town to discuss.
DPRB PROD1 Orient to same TF as when drilled (35L). Try to work down
slow thru bad spot, holding the same tool face as original hole.
Started seeing motor work at 11952'. Drilled to 11984'. DD
reports that based on INC and AZI, we have sidetracked again.
Sidetrack depth 11952'.
DPRB PROD1 Pull to shoe to wait on results of town conversation and plan
forward.
PROD1 Log tie in at RA tag. Make +2' correction.
PROD1 RIH to confirm TD. Hang up at 11,950'. Orient to TF when
Printed: 3/10/2003 8:14:49 AM
)
')
BP Exploration
Operations Summary Report
Legal Well Name:
Common Well Name:
Event Name:
Contractor Name:
Rig Name:
W-19A
W-19
REENTER+COMPLETE
NORDIC CALISTA
NORDIC 1
Start: 2/24/2003
Rig Release: 3/7/2003
Rig Number:
Spud Date: 11/15/1998
End: 3/7/2003
3/5/2003 18:30 - 19:45 1.25 DRILL P PROD1 drilled and attempt to get back down to 11,984'. Unable to get
back to 11,984'. Tag at 11,955'. Will call TD 11,955'.
19:45 - 22:20 2.58 DRILL P PROD1 POH. No hole problems.
22:20 - 23:00 0.67 DRILL P PROD1 LD BHA.
23:00 - 00:00 1.00 DRILL P PROD1 PU liner running tools. Cut 8' of coil. Rehead coil with Baker
CTC. Stand back injector.
3/6/2003 00:00 - 00:15 0.25 CASE COMP RU to run liner.
00:15 - 00:30 0.25 CASE COMP PJSM for running liner.
00:30 - 01 :30 1.00 CASE COMP Run 2 7/8" 6.16#, L-80, STL solid and pre drilled(slotted) liner.
01 :30 - 01 :50 0.33 CASE COMP PU SWS memory GR/CCL and 2 joints of 1 1/4" CS Hydril, and
Baker CTLRT.
01 :50 - 02:00 0.17 CASE COMP MU CTC.
02:00 - 04:00 2.00 CASE COMP RIH to 10,900'. Make depth correction from pipe flag, -49'.
PU=45K, SO=20K at 0.5 bpm.
04:00 - 04:35 0.58 CASE COMP Run into open hole with liner. Taking weight at 11,560'. PU
and go through tight spot. Ratty below. Set down at 11,688'.
PU and work through. Tag at 11,944'. Pick up and tag again
at 11,944'. Pick up and tag at 11,945'. PU and tag at 11,946'.
Pick up and tag at 11,946'. PU and tag at 11,946'.
04:35 - 05:10 0.58 CASE P COMP PU to align reel. Drop 5/8" ball. Tag at 11,946'. Pump ball
down at 2,6 bpm, 1.2 bpm returns. Slow rate to 0.8 bpm after
41 bbls pumped. Ball seated at 48.5 bbls. Pressure up to
2,400 psi and release from liner. Pick up to check that coil is
disconneted from liner. Set back down on liner top.
05: 1 0 - 05:40 0.50 CASE P COMP Log up with memory GR/CCL from 11,044' to 10,652'.
05:40 - 07:15 1.58 CASE P COMP POH.
07: 15 - 07:30 0.25 CASE P COMP Tag up at surface. Due to mud losses hold PJSM prior to
standing back injector. Discuss plan forward for today.
07:30 - 08:45 1.25 CASE P COMP Stand back injector, lay down liner/logging BHA. SWS log
confirms that the top of the liner is outside the window 20', and
we should be clean for the fishing runs for the whipstock tray
and anchor.
08:45 - 09:00 0.25 CASE P COMP Safety meeting prior to picking up fishing BHA.
09:00 - 09:45 0.75 FISH P COMP make up fishing BHA. BHA #13
09:45 - 12:00 2.25 FISH P COMP RIH with BHA #13 to fish whipstock tray. Stop at EOP flag at
10467', add BHA length, set depth to 10560' for a correction of
-51'. The typical correction on this well has been -40'.
Continue RIH.
12:00 - 12:30 0.50 FISH P COMP Stop at 10850'. Weight check = 41 klbs. Kick on pumps to 1.0
bpm, RIH slowly to engage fish. See motor work at 10928' (20'
high). Raise pump rate to 1.5 bpm, then shut down. PU and
slipped off fish on first attempt. Try again. Got solid bite on
second attempt. Take jar licks 15 klbs over. Shear pull disco
goes at 26k over. Hit 8 jar licks. Came free on 8th hit.
12:30 - 15:25 2.92 FISH P COMP Pulled free on 8th jar lick. PU at 46 klbs. POOH to see if we
have fish. Pumping over the top to keep the well full. Holding
200 psi on well with choke to ensure that the hole stays full.
15:25 -16:05 0.67 FISH P COMP Tag up at surface, stand back injector. Lay down BHA #13.
No fish recovery. Found marks on inside of overshot
consistent with whipstock tray. Overshot did not retain fish.
Consult with WF office in Deadhorse. Order different overshot
with interal hydraulic backup prong.
Printed: 3/10/2003 8:14:49 AM
)
')
Legal Well Name:
Common Well Name:
Event Name:
Contractor Name:
Rig Name:
3/6/2003
16:05 - 17:30
17:30 - 18:00
18:00 - 20:20
20:20 - 21:15
Operations Summary Report
W-19A
W-19
REENTER+COMPLETE
NORDIC CALISTA
NORDIC 1
Start: 2/24/2003
Rig Release: 3/7/2003
Rig Number:
Spud Date: 11/15/1998
End: 3/7/2003
Hours Task
1.42 FISH P
0.50 FISH P
2.33 FISH P
COMP
COMP
COMP
0.92 FISH P
COMP
21 :15 - 23:50 2.58 FISH P COMP
23:50 - 00:00 0.17 FISH P COMP
3/7/2003 00:00 - 00: 15 0.25 FISH P COMP
00:15 - 02:30 2.25 FISH P COMP
02:30 - 03:15 0.75 FISH P COMP
03:15 - 06:30
06:30 - 07:05
07:05 - 08:50
08:50 - 10:30
3.25 FISH P
0.58 FISH P
COMP
COMP
1.75 FISH P
COMP
1.67 FISH
P
COMP
Wait on fishing eq from Deadhorse.
Make up second fishing BHA.
RIH with second fishing BHA, overshot with hydraulic inner
cone, to recover whipstock tray. BHA #14. Stop at EOP flag at
10,467'. Add BHA length, set depth to 10,560' for a -59.7'
correction. RIH to 10,850'. PU=43K w/o pump. PU=43K at
1.0 bpm. SO=18K at 1.0 bpm, 1,200 psi. Tag whipstock at
10,921' while pumping 1.0 bpm.
Set down 5K and raise pump rate to 1.6 bpm, 2,691 psi. Stop
pump. Pick up to 50K and popped free. Not sure if we have
fish. Set back down at 11,921'. Bring pump up to 1.5 bpm,
1,850 psi. Set down 8K. Stop pump. Pick up to 45K and
weight fell of to 43K. Does not look like we have fish. Set back
down w/o pump and let jar hit down. Bring pump up to 2.0
bpm, 3,100 psi. Stop pump and bleed pressure off. PU to
45K, same as last attempt. Make another attempt. Same
results. Set down dry. PU to 46K and fell to 43K. Set down
pumping at 2.1 bpm. Pressure increased to 2,600 psi. Bleed
pressure. PU. Decide to POH and inspect overshot.
POH. Did not have fish. No indication from overshot that we
slipped off of the fish.
MU overshot from first run.
Change overshot. MU CTC.
RIH. Stop at EOP flag at 10,467'. Add BHA, make -62.2'
correction.
10,843'. PU=43K with and without pump. 1 bpm 895 psi.
SO=18.5K. 2 bpm, 1,730 psi. Tag fish at 10,919' pumping at
2.1 bpm. SO 5K. Pressure increased to 2,900 psi. Shut down
pump. Jar hit down and weight came back. Bring up pump to
2.0 bpm, 2,800 psi and SO 5K. Shut down pump. SO 8K. PU
and hit jars 4 times at 57K, 56K, 60K, 63K. Hold 55K after
fourth jar and came free. PU=45.5K, may have fish. Pull up to
XN nipple to see if there is any drag, none. RIH and lightly
tagged at 10,915'.
POH.
Tag up at surface, stand back injector. Examine overshot.
Hurray, we have the whipstock tray. Lay down BHA and
overshot. Call for Schlumberger engineer to come to location
to remove RA tag from whipstock. Rig up spear to retrieve
anchor.
RIH to retrieve Whipstock Anchor with BHA #16, WF spear,
jars. No flag left on coil. Make -40' correction, and expect to
tag WS anchor at 10957'.
Note - SWS engineer Butch Gumminger came to location and
removed the 2 pip tags from the whipstock.
Weight check at 10850' = 39 klbs with 1.2 bpm, 42 klbs at 0
bpm. RIH, set down on top of anchor at 10954'. PU, confirm
we are latched it. PU 6klbs over. Gradually work weight up in
1000 Ibs cycles. At 58klbs, 17klbs over normal with pump
down and pulled free. Standby for 5 minutes to let elements
relax if packer is free instead of collets shearing. PU at 45
klbs. Was 41 klbs at weight check. Appear to have packer
Printed: 3/10/2003 8: 14:49 AM
-)
Page 16 of 16
Operations Summary Report
Legal Well Name:
Common Well Name:
Event Name:
Contractor Name:
Rig Name:
W-19A
W-19
REENTER+COMPLETE
NORDIC CALISTA
NORDIC 1
Date To Hours Task Code NPT Phase
3/7/2003 08:50 - 10:30 1.67 FISH P CaMP
10:30-11:10 0.67 FISH P CaMP
11:10 -13:30 2.33 FISH P CaMP
13:30 - 14:30 1.00 FISH P CaMP
14:30 - 15:30 1.00 WHSUR P CaMP
15:30 - 15:50 0.33 RIGD P POST
15:50 - 16:05 0.25 RIGD P POST
16:05 - 16:15 0.17 RIGD P POST
16:15 - 18:00 1.75 RIGD N SFAL POST
18:00 - 18:45 0.75 RIGD N SFAL POST
18:45 - 19:00 0.25 RIGD N SFAL POST
19:00 - 20:00 1.00 RIGD P POST
20:00 - 21 :30 1.50 RIGD P POST
21 :30 - 23:00 1.50 RIGD P POST
23:00 - 23:30 0.50 MOB P PRE
23:30 - 00:00 0.50 MOB P PRE
Start: 2/24/2003
Rig Release: 3/7/2003
Rig Number:
Spud Date: 11/15/1998
End: 3/7/2003
Description of Operations
free. Try to move it up hole. Pull up 30'. Hung up at 10923'.
Can't go back down. Standby again at neutral wt for 20
minutes to let elements relax some more.
10912', Can't pull anchor up thru what is probably a collar.
Can't RIH. Jar up on it to see if we can get free. Can't jar
agressively as the spear will release with an overpull at 12 klbs.
Jar as much as we can. Finally got free. Hung up 30' later.
Definately next collar. Jarred free. Hung up 30' later, didn't
need to jar, but just overpulled to get free. Getting better. Next
collar was just a weight bobble. Clean up to the XN nipple.
(Milled to 3.80"). Hung up. Jar up. Popped free after several
licks. Pull up, hung up at X nipple. Jarred free. Thru all the
jewalry.
POOH with the packer.
Tag up at surface, Lay down BHA. Whipstock anchor
recovered ok. Rubber element from packer left in hole. WF
will generate drawing and forward to NS Wells Group.
Bullhead 60/40 down well for freeze protect. Pump 50 bbls of
60/40 methanol/water.
Pump 30 bbls of water in coil to displace flopro mud using rig
pumps.
Safety meeting will all rig hands. Discuss hazards of pumping
N2 for blowing down coil. Discuss safe and danger areas on
rig. Flag off danger areas for no access.
Pump N2 to purge coil.
N2 pumper inoperational. Consult with SWS Deadhorse shop.
Troubleshoot problem. Attempt to get burner lit. Excess fuel
ignited, and had a minor fire in pumper burner box. Extinguish
fire. N2 pumper can not be repaired. Also had a diesel spill
from defective N2 burner. Secured area. Made sure there was
no further risk of injury to personnel, spill, or damage to
equipment.
Notify SSD safety - Jeff Kilfoil, NS fire department, NS Spill
reporting hotline, CTD Superintendent - Paul Hyatt.
Standby for investigation of spill and fire, and cleanup of spill.
PJSM for purging reel with N2.
Pressure test lines to 2,500 psi. Purge coil with N2. Blow
down rig lines w/ N2.
Clean pits. Remove BOP. Pressure test tree to 4,000 psi.
Secure well. Release rig at 21 :30.
Continue with rig down. Hold post rig pad inspection with W
pad operator. Pad passed inspection.
Pre rig move safety meeting. Attended by rig crew, BP Co
Rep, Security, Peak, Tool Service, CPS. Discuss route of
travel, hazards, and mitigation.
Move Nordic Rig #1 from W pad. Heading to P2-57 at Point
Mcl ntyre.
Printed: 3/10/2003 8:14:49 AM
)
)
26-Mar-03
AOGCC
333 W. 7th Ave. Suite 100
Anchorage, AK 99501
Re: Distribution of Survey Data for Well W-19A L 1
Dear Dear Sir/Madam:
Enclosed are two survey hard copies and 1 disk
Tie-on Survey: 12,275.52 I MD
Window / Kickoff Survey: 12,295.00 I MD (if applicable)
Projected Survey: 12,675.00 I MD
Please call me at 273-3545 if you have any questions or concerns.
Regards,
William T. Allen
Survey Manager
Attachment(s)
RECEIVED
APR 1 7 2003
Alaska Œ: & Gas Coos. Commission
Anchorage
a 0 ~ ~¿;¡85
Sperry-Sun Drilling Services
North Slope Alaska
BPXA
W-19AL1
-'
Job No. AKMW2299019, Surveyed: 1 March, 2003
Survey Report
25 March, 2003
Your Ref: API 500292200660
Surface Coordinates: 5959560.93 N, 612049.07 E (70017' 54.4734" N, 149005' 33.2470" W)
Grid Coordinate System: NAD27 Alaska State Planes, Zone 4
Kelly Bushing: 83.40ft above Mean Sea Level
.--
55p=t ·.....V-5UI1
DAfLLfNG~S e R\l1 c: e's
A Halliburton Company
Survey Ref: svy3994
Sperry-Sun Drilling Services
Survey Report for W-19AL 1
Your Ref: API 500292200660
Job No. AKMW2299019, Surveyed: 1 March, 2003
BPXA
North Slope Alaska
Measured Sub-Sea Vertical Local Coordinates Global Coordinates Dogleg Vertical
Depth Incl. Azim. Depth Depth Northings Eastings Northings Eastings Rate Section Comment
(ft) (ft) (ft) (ft) (ft) (ft) (ft) (0/100ft)
12275.52 94.540 281.580 8882.28 8965.68 5486.12 N 3195.43 W 5964998.80 N 608772.20 E 4583.82 Tie On Point
12295.00 94.120 282.030 8880.81 8964.21 5490.10 N 3214.44 W 5965002.49 N 608753.13 E 3.155 4603.20 Window Point
12312.38 93.480 283.700 8879.65 8963.05 5493.96 N 3231.35 W 5965006.10 N 608736.16 E 10.270 4620.51
12345.24 95.510 285.990 8877.08 8960.48 5502.35 N 3263.01 W 5965014.02 N 608704.38 E 9.297 4653.26
12374.21 93.480 289.860 8874.81 8958.21 5511.24 N 3290.48 W 5965022.49 N 608676.78 E 15.048 4682.12
"---
12405.64 91.540 291.270 8873.43 8956.83 5522.27 N 3319.88 W 5965033.08 N 608647.22 E 7.628 4713.42
12435.04 89.780 294.440 8873.09 8956.49 5533.68 N 3346.96 W 5965044.09 N 608619.97 E 12.332 4742.60
12451.64 89.690 296.210 8873.17 8956.57 5540.78 N 3361.97 W 5965050.97 N 608604.86 E 10.676 4758.98
12482.64 89.600 293.150 8873.36 8956.76 5553.73 N 3390.13 W 5965063.49 N 608576.51 E 9.875 4789.62
12511.89 90.220 290.220 8873.41 8956.81 5564.53 N 3417.31 W 5965073.89 N 608549.17 E 10.239 4818.72
12541.06 90.750 286.870 8873.16 8956.56 5573.81 N 3444.96 W 5965082.75 N 608521.39 E 11.627 4847.86
12570.67 91.540 283.700 8872.57 8955.97 5581.61 N 3473.51 W 5965090.13 N 608492.72 E 11.031 4877.46
12604.67 92.160 281.580 8871.47 8954.87 5589.05 N 3506.67 W 5965097.07 N 608459.46 E 6.493 4911.38
12636.71 91.450 278.060 8870.46 8953.86 5594.51 N 3538.22 W 5965102.06 N 608427.83 E 11 .202 4943.21
12675.00 91 .450 278.060 8869.49 8952.89 5599.87 N 3576.12 W 5965106.86 N 608389.85 E 0.000 4981.12 Projected Survey
All data is in Feet (US Survey) unless otherwise stated. Directions and coordinates are relative to True North.
Vertical depths are relative to Well Reference. Northings and Eastings are relative to Well Reference.
Global Northings and Eastings are relative to NAD27 Alaska State Planes, Zone 4.
The Dogleg Severity is in Degrees per 100 feet (US Survey).
Vertical Section is from Well Reference and calculated along an Azimuth of 286.000° (True).
Magnetic Declination at Surface is 25.725°(21-Feb-03)
'~
Based upon Minimum Curvature type calculations, at a Measured Depth of 12675.00ft.,
The Bottom Hole Displacement is 6644.34ft., in the Direction of 327.437° (True).
25 March, 2003 - 17:34
Page2of3
DrillQuest 3.03.02.002
Sperry-Sun Drilling Services
Survey Report for W-19AL 1
Your Ref: API 500292200660
Job No. AKMW2299019, Surveyed: 1 March, 2003
BPXA
North Slope Alaska
Comments
Measured
Depth
(ft)
Station Coordinates
TVD Northings Eastings
(ft) (ft) (ft)
Comment
12275.52
8965.68
5486.12 N
3195.43 W
Tie On Point
.~
12295.00
12675.00
8964.21
8952.89
5490.10 N
5599.87 N
3214.44 W
3576.12 W
Window Point
Projected Survey
Survey tool prooram for W-19AL 1
From
Measured Vertical
Depth Depth
(ft) (ft)
To
Measured Vertical
Depth Depth Survey Tool Description
(ft) (ft)
0.00
10941 .77
0.00 10941.77
8773.38 12675.00
8773.38 BP High Accuracy Gyro(W-19)
8952.89 MWD Magnetic(W-19AL 1 PB1)
~
25 March, 2003 - 17:34
Page 3 of3
DrillQuest 3.03.02.002
)
)
26-Mar-03
AOGCC
333 W. 7th Ave. Suite 100
Anchorage, AK 99501
Re: Distribution of Survey Data for Well W-19A L 1 PB 1
Dear Dear Sir/Madam:
Enclosed are two survey hard copies and 1 disk
Tie-on Survey: 10,941.77' MD
Window / Kickoff Survey: 10,948.00' MD (if applicable)
Projected Survey: 11,925.00' MD
Please call me at 273-3545 if you have any questions or concerns.
Regards,
William T. Allen
Survey Manager
RECE\VED
APR 1( 2.003
'\i.' P. G~a5 Cons Con1m'S8tQn
Alas\<.a \J1ì QI. ,
Anc,hotage
Attachment(s)
o?()~~;¡35
Sperry-Sun Drilling Services
North Slope Alaska
BPXA
W-19AL1 PB1
Job No. AKMW2299019, Surveyed: 1 March, 2003
Survey Report
25 March, 2003
Your Ref: API 500292200670
Surface Coordinates: 5959560.93 N, 612049.07 E (70017' 54.4734" N, 149005' 33.2470" W)
Grid Coordinate System: NAD27 Alaska State Planes, Zone 4
Kelly Bushing: 83.40ft above Mean Sea Level
'-'
5pE!r"......y-SUf1
DAIL L.lNG "5 e A'V I c: S'S
A Halliburton Company
Survey Ref: svy3992
Sperry-Sun Drilling Services
Survey Report for W-19AL 1 PB1
Your Ref: API 500292200670
Job No. AKMW2299019, Surveyed: 1 March, 2003
BPXA
North Slope Alaska
Measured Sub-Sea Vertical Local Coordinates Global Coordinates Dogleg Vertical
Depth Incl. Azim. Depth Depth Northings Eastings Northings Eastings Rate Section Comment
(ft) (ft) (ft) (ft) (ft) (ft) (ft) (0/100ft)
10941 .77 41.090 334.300 8689.98 8773.38 4914.90 N 2140.89 W 5964443.36 N 609835.13 E 3412.69 Tie On Point
MWD Magnetic
10948.00 41 .730 334.540 8694.66 8778.06 4918.62 N 2142.67 W 5964447.05 N 609833.30 E 10.584 3415.42 Window Point
10981.33 44.930 333.190 8718.90 8802.30 4939.14 N 2152.75 W 5964467.43 N 609822.91 E 9.995 3430.77
11013.76 49.520 332.070 8740.92 8824.32 4960.27 N 2163.70 W 5964488.39 N 609811.65 E 14.378 3447.12
11043.92 53.740 331.160 8759.64 8843.04 4981.07 N 2174.94 W 5964509.02 N 609800.10 E 14.190 3463.66 -
11076.19 60.250 330.280 8777.20 8860.60 5004.66 N 2188.18 W 5964532.40 N 609786.51 E 20.302 3482.88
11108.37 64.850 334.090 8792.04 8875.44 5029.91 N 2201.48 W 5964557.46 N 609772.84 E 17.737 3502.63
11138.24 70.570 334.800 8803.36 8886.76 5054.84 N 2213.39 W 5964582.20 N 609760.55 E 19.275 3520.95
11169.96 75.860 333.920 8812.52 8895.92 5082.20 N 2226.53 W 5964609.37 N 609747.01 E 16.887 3541 .13
11199.46 82.560 334.440 8818.04 8901.44 5108.27 N 2239.15 W 5964635.25 N 609734.01 E 22.778 3560.44
11229.17 85.810 328.980 8821.05 8904.45 5134.28 N 2253.15 W 5964661.05 N 609719.62 E 21.304 3581.07
11261.14 89.520 323.340 8822.36 8905.76 5160.80 N 2270.93 W 5964687.30 N 609701.44 E 21.101 3605.47
11293.49 87.670 318.060 8823.15 8906.55 5185.82 N 2291.40 W 5964712.01 N 609680.60 E 17.289 3632.04
11327.46 84.320 311 .180 8825.52 8908.92 5209.60 N 2315.50 W 5964735.43 N 609656.15 E 22.479 3661.77
11359.34 84.490 308.010 8828.63 8912.03 5229.82 N 2339.95 W 5964755.28 N 609631.40 E 9.911 3690.84
11391.69 83.000 303.610 8832.16 8915.56 5248.64 N 2366.02 W 5964773.70 N 609605.06 E 14.283 3721.08
11420.96 82.290 299.910 8835.91 8919.31 5263.91 N 2390.70 W 5964788.61 N 609580.15 E 12.769 3749.02
11448.02 81.670 297.440 8839.68 8923.08 5276.77 N 2414.20 W 5964801.12 N 609556.46 E 9.324 3775.16
11477.12 81.320 294.620 8843.99 8927.39 5289.40 N 2440.06 W 5964813.36 N 609530.41 E 9.659 3803.49
11510.17 81.670 289.860 8848.88 8932.28 5301.77 N 2470.31 W 5964825.27 N 609499.99 E 14.283 3835.98
11543.04 81.230 287.040 8853.77 8937.17 5312.05 N 2501.14 W 5964835.10 N 609469.01 E 8.589 3868.45
11575.49 80.530 282.640 8858.91 8942.31 5320.26 N 2532.10 W 5964842.84 N 609437.93 E 13.560 3900.47 ~-
11608.87 80.970 275.240 8864.29 8947.69 5325.37 N 2564.62 W 5964847.4 7 N 609405.33 E 21.920 3933.14
11639.37 81 .940 281.580 8868.82 8952.22 5329.78 N 2594.44 W 5964851 .44 N 609375.45 E 20.800 3963.03
11678.42 82.910 286.340 8873.97 8957.37 5339.12 N 2632.00 W 5964860.21 N 609337.76 E 12.336 4001.70
11717.12 86.340 288.100 8877.60 8961.00 5350.53 N 2668.79 W 5964871.07 N 609300.80 E 9.952 4040.21
11748.84 88.370 292.330 8879.06 8962.46 5361.47 N 2698.52 W 5964881.57 N 609270.91 E 14.778 4071.80
11784.20 88.720 297.970 8879.96 8963.36 5376.49 N 2730.50 W 5964896.11 N 609238.71 E 15.976 4106.69
11811.38 88.460 303.080 8880.63 8964.03 5390.29 N 2753.90 W 5964909.56 N 609215.11 E 18.819 4132.98
11839.08 86.340 305.020 8881.89 8965.29 5405.78 N 2776.83 W 5964924.70 N 609191.95 E 10.369 4159.29
25 March, 2003 - 17:09
Page 2 of 4
DrillQuest 3.03.02.002
Sperry-Sun Drilling Services
Survey Report for W-19AL 1 PB1
Your Ref: API 500292200670
Job No. AKMW2299019, Surveyed: 1 March, 2003
North Slope Alaska
Measured Sub-Sea Vertical Local Coordinates Global Coordinates
Depth Incl. Azim. Depth Depth Northings Eastings Northings Eastings
(ft) (ft) (ft) (ft) (ft) (ft) (ft)
11874.73 85.020 299.550 8884.57 8967.97 5424.76 N 2806.87 W 5964943.23 N 609161.63 E
11903.70 85.810 297.790 8886.89 8970.29 5438.61 N 2832.20 W 5964956.71 N 609136.09 E
11925.00 85.810 297.790 8888.45 8971.85 5448.52 N 2850.99 W 5964966.33 N 609117.15 E
All data is in Feet (US Survey) unless otherwise stated. Directions and coordinates are relative to True North.
Vertical depths are relative to Well Reference. Northings and Eastings are relative to Well Reference.
Global Northings and Eastings are relative to NAD27 Alaska State Planes, Zone 4.
The Dogleg Severity is in Degrees per 100 feet (US Survey).
Vertical Section is from Well Reference and calculated along an Azimuth of 286.000° (True).
Magnetic Declination at Surface is 25.725°(21-Feb-03)
Based upon Minimum Curvature type calculations, at a Measured Depth of 11925.00ft.,
The Bottom Hole Displacement is 6149.35ft., in the Direction of 332.379° (True).
Comments
Measured
Depth
(ft)
Station Coordinates
TVD Northings Eastings
(ft) (ft) (ft)
Comment
1 0941 .77
10948.00
11925.00
4914.90 N
4918.62 N
5448.52 N
Tie On Point
Window Point
Projected Survey
2140.89 W
2142.67 W
2850.99 W
8773.38
8778.06
8971.85
25 March, 2003 - 17:09
Page 3 of4
Dogleg
Rate
C/100ft)
15.741
6.641
0.000
BPXA
Vertical
Section Comment
4193.40
4221.57
4242.37 Projected Survey
'~.
j
'-
DrillQuest 3.03.02.002
Sperry-Sun Drilling Services
Survey Report for W-19AL 1 PB1
Your Ref: API 500292200670
Job No. AKMW2299019, Surveyed: 1 March, 2003
BPXA
North Slope Alaska
Survey tool proqram for W-19AL 1 PB1
Fro m
Measured Vertical
Depth Depth
(ft) (ft)
To
Measured Vertical
Depth Depth Survey Tool Description
(ft) (ft)
0.00
10941 .77
0.00 10941.77
8773.38 11925.00
8773.38 BP High Accuracy Gyro(W-19)
8971.85 MWD Magnetic(W-19AL 1 PB1)
..~
..-,
25 March, 2003 - 17:09
Page 4 of 4
DrillQuest 3.03.02.002
)
')
c5?~~a36
26-Mar-03
AOGCC
333 W. 7th Ave. Suite 100
Anchorage, AK 99501
Re: Distribution of Survey Data for Well W-19A L 1 PB2
Dear Dear Sir/Madam:
Enclosed are two survey hard copies and 1 disk
Tie-on Survey: 11,543.04' MD
Window / Kickoff Survey: 11,562.74' MD (if applicable)
Projected Survey: 12,701.00' MD
Please call me at 273-3545 if you have any questions or concerns.
Regards,
William T. Allen
Survey Manager
RECEIVED
Attachment(s)
APR 1 7 2003
A!aafœ œ & Gas Cons. Commiøïon
Anct1tnge
Sperry-Sun Drilling Services
North Slope Alaska
BPXA
W-19AL 1 PB2
--"
Job No. AKMW2299019, Surveyed: 1 March, 2003
Survey Report
25 March, 2003
Your Ref: API 500292200671
Surface Coordinates: 5959560.93 N, 612049.07 E (70017' 54.4734" N, 149005' 33.2470" W)
Grid Coordinate System: NAD27 Alaska State Planes, Zone 4
Kelly Bushing: 83.40ft above Mean Sea Level
'~
SpE!r'r'Y-5UI'1
OAIL..:CING" "SERVIC: es
A Halliburton Company
Survey Ref: svy3993
Sperry-Sun Drilling Services
Survey Report for W-19AL 1 PB2
Your Ref: API 500292200671
Job No. AKMW2299019, Surveyed: 1 March, 2003
BPXA
North Slope Alaska
Measured Sub-Sea Vertical Local Coordinates Global Coordinates Dogleg Vertical
Depth Incl. Azim. Depth Depth Northings Eastings Northings Eastings Rate Section Comment
(ft) (ft) (ft) (ft) (ft) (ft) (ft) (0/100ft)
11543.04 81.230 287.040 8853.77 8937.17 5312.05 N 2501.14 W 5964835.10 N 609469.01 E 3868.45 Tie On Point
11562.74 80.620 284.750 8856.87 8940.27 5317.38 N 2519.85 W 5964840.15 N 609450.22 E 11 .889 3887.90 Window Point
11575.15 81 .100 286.850 8858.85 8942.25 5320.72 N 2531.63 W 5964843.31 N 609438.38 E 17.149 3900.15
11 609. 1 5 82.310 282.130 8863.75 8947.15 5329.13 N 2564.20 W 5964851.23 N 609405.70 E 14.190 3933.77
11639.15 84.700 287.990 8867.15 8950.55 5336.87 N 2592.97 W 5964858.55 N 609376.82 E 20.978 3963.56
11662.70 85.110 290.920 8869.24 8952.64 5344.69 N 2615.08 W 5964866.03 N 609354.59 E 12.514 3986.97 ~
11701.17 83.080 296.210 8873.20 8956.60 5359.97 N 2650.14 W 5964880.79 N 609319.30 E 14.660 4024.89
11730.87 81.320 299.730 8877.23 8960.63 5373.77 N 2676.13 W 5964894.20 N 609293.12 E 13.152 4053.67
11760.54 81.760 302.730 8881.60 8965.00 5388.99 N 2701.22 W 5964909.04 N 609267.80 E 10.111 4081.98
11789.27 83.080 299.910 8885.39 8968.79 5403.79 N 2725.55 W 5964923.48 N 609243.26 E 10.760 4109.45
11824.72 85.290 295.680 8888.98 8972.38 5420.22 N 2756.7 4 W 5964939.45 N 609211.82 E 13.408 4143.96
11853.45 87.490 293.210 8890.79 8974.19 5432.09 N 2782.84 W 5964950.92 N 609185.55 E 11 .500 4172.32
11888.54 89.690 292.150 8891.66 8975.06 5445.61 N 2815.20 W 5964963.96 N 609152.99 E 6.959 4207.16
11918.90 88.110 290.040 8892.24 8975.64 5456.54 N 2843.52 W 5964974.46 N 609124.51 E 8.681 4237.39
11950.90 87.670 285.630 8893.42 8976.82 5466.33 N 2873.95 W 5964983.80 N 609093.93 E 13.840 4269.34
11981.82 89.340 281.930 8894.22 8977.62 5473.69 N 2903.96 W 5964990.71 N 609063.81 E 13.125 4300.22
12015.50 91.190 279.290 8894.07 8977.47 5479.89 N 2937.06 W 5964996.42 N 609030.63 E 9.571 4333.75
12048.09 90.480 275.940 8893.59 8976.99 5484.21 N 2969.36 W 5965000.25 N 608998.27 E 10.506 4365.98
12085.72 90.220 271.010 8893.36 8976.76 5486.49 N 3006.91 W 5965001.97 N 608960.69 E 13.119 4402.71
12139.00 90.660 263.960 8892.95 8976.35 5484.15 N 3060.10 W 5964998.84 N 608907.54 E 13.257 4453.19
12168.17 93.920 264.310 8891.79 8975.19 5481 .17 N 3089.09 W 5964995.43 N 608878.60 E 11 .240 4480.24
12208.29 95.150 269.420 8888.61 8972.01 5478.99 N 3129.01 W 5964992.65 N 608838.71 E 13.062 4518.01
12243.20 95.950 277.000 8885.23 8968.63 5480.93 N 3163.68 W 5964994.08 N 608804.02 E 21.732 4551.87 "-'
12275.52 94.540 281.580 8882.28 8965.68 5486.12 N 3195.43 W 5964998.80 N 608772.20 E 14.770 4583.82
12320.79 97.710 286.340 8877.44 8960.84 5496.97 N 3239.09 W 5965009.00 N 608728.37 E 12.582 4628.79
12351.02 97.180 289.330 8873.53 8956.93 5506.15 N 3267.63 W 5965017.75 N 608699.71 E 9.963 4658.74
12384.59 93.130 290.390 8870.51 8953.91 5517.51 N 3299.06 W 5965028.64 N 608668.11 E 12.467 4692.10
12413.67 90.310 293.390 8869.64 8953.04 5528.34 N 3326.03 W 5965039.07 N 608640.98 E 14.154 4721.00
12442.17 91.630 294.620 8869.16 8952.56 5539.94 N 3352.06 W 5965050.27 N 608614.78 E 6.330 4749.22
12473.75 92.250 291.450 8868.09 8951.49 5552.28 N 3381.10 W 5965062.18 N 608585.56 E 10.222 4780.54
12504.06 90.750 287.040 8867.29 8950.69 5562.27 N 3409.70 W 5965071.74 N 608556.82 E 15.363 4810.78
12535.73 90.840 283.700 8866.85 8950.25 5570.66 N 3440.23 W 5965079.68 N 608526.16 E 10.549 4842.44
12570.71 91 .100 280.520 8866.26 8949.66 5578.00 N 3474.42 W 5965086.50 N 608491.87 E 9.120 4877.33
12600.43 92.250 276.470 8865.39 8948.79 5582.38 N 3503.80 W 5965090.45 N 608462.43 E 14.160 4906.78
12631.26 92.780 273.650 8864.04 8947.44 5585.10 N 3534.47 W 5965092.71 N 608431.71 E 9.298 4937.02
25 March, 2003 - 17:33 Page 2 of4 DríllQuest 3.03.02.002
Sperry-Sun Drilling Services
Survey Report for W-19AL 1 PB2
Your Ref: API 500292200671
Job No. AKMW2299019, Surveyed: 1 March, 2003
North Slope Alaska
Measured Sub-Sea Vertical
Depth Incl. Azim. Depth Depth
(ft) (ft) (ft)
12665.63 91.980 271.540 8862.61 8946.01
12701.00 91.980 271.540 8861.39 8944.79
Local Coordinates
Northings Eastings
(ft) (ft)
Global Coordinates
Northings Eastings
(ft) (ft)
3568.78 W
3604.11 W
5965093.75 N
5965094.18 N
5586.66 N
5587.61 N
All data is in Feet (US Survey) unless otherwise stated. Directions and coordinates are relative to True North.
Vertical depths are relative to Well Reference. Northings and Eastings are relative to Well Reference.
Global Northings and Eastings are relative to NAD27 Alaska State Planes, Zone 4.
The Dogleg Severity is in Degrees per 100 feet (US Survey).
Vertical Section is from Well Reference and calculated along an Azimuth of 286.000° (True).
Magnetic Declination at Surface is 25.725°(21-Feb-03)
Based upon Minimum Curvature type calculations, at a Measured Depth of 12701.00ft.,
The Bottom Hole Displacement is 6649.13ft., in the Direction of 327.177° (True).
Comments
Measured
Depth
(ft)
Station Coordinates
TVD Northings Eastings
(ft) (ft) (ft)
Comment
11543.04
11562.74
12701.00
8937.17
8940.27
8944.79
5312.05 N
5317.38 N
5587.61 N
2501.14 W
2519.85 W
3604.11 W
Tie On Point
Window Point
Projected Survey
25 March, 2003 - 17:33
Page 3 014
608397.39 E
608362.05 E
BPXA
Dogleg Vertical
Rate Section Comment
e/100ft)
6.561 4970.42
0.000 5004.65 Projected Survey
~
-~
DrillQuest 3.03.02.002
Sperry-Sun Drilling Services
Survey Report for W-19AL 1 PB2
Your Ref: API 500292200671
Job No. AKMW2299019, Surveyed: 1 March, 2003
BPXA
North Slope Alaska
Survey tool proqram for W-19AL 1 PB2
Fro m
Measured Vertical
Depth Depth
(ft) (ft)
To
Measured Vertical
Depth Depth Survey Tool Description
(ft) (ft)
0.00
10941 .77
0.00 10941.77
8773.38 12701.00
8773.38 BP High Accuracy Gyro(W-19)
8944.79 MWD Magnetic(W-19AL1 PB1)
~
-.-I
25 March, 2003 - 17:33
Page 4 of4
DrillQuest 3.03.02.002
')
~:~1E ]? IÆ~fÆ~'~fÆ
)
AI~ASIiA OIL AND GAS
CONSERVATION COMMISSION
I
/
/
I
TONY KNOWLES, GOVERNOR
333 W. ]TH AVENUE, SUITE 100
ANCHORAGE, ALASKA 99501-3539
PHONE (907) 279-1433
FAX (907) 276-7542
Thomas McCarty
CT Drilling Engineer
BP Exploration (Alaska), Inc.
PO Box 196612
Anchorage AK 99519
Re: Prudhoe Bay Unit W -19AL1
BP Exploration (Alaska), Inc.
Permit No: 202-235
Surface Location: 695' SNL, 1181' WEL, Sec. 21, T11N, R12E, UM
Bottomhole Location: 4933' NSL, 12' WEL, Sec. 17, T11N, R12E, UM
Dear Mr. McCarty:
Enclosed is the approved application for permit to redrill the above development well.
This permit to redrill does not exempt you from obtaining additional permits or approvals
required by law from other governmental agencies, and does not authorize conducting drilling
operations until all other required permits and approvals have been issued. In addition, the
Commission reserves the right to withdraw the permit in the event it was erroneously issued.
The permit is for a new wellbore segment of existing well PBU W-19A, Permit No 198-199, API
50-029-22006-01. Production should continue to be reported as a function of the original API
number stated above.
Operations must be conducted in accordance with AS 31.05 and Title 20, Chapter 25 of the
Alaska Administrative Code unless the Commission specifically authorizes a variance. Failure
to comply with an applicable provision of AS 31.05, Title 20, Chapter 25 of the Alaska
Administrative Code, or a Commission order, or the terms and conditions of this permit may
result in the revocation or suspension of the permit. Please provide at least twenty-four (24)
hours notice for a representative of the Commission to witness any required test. Contact the
Commission's North Slope petroleum field inspector at 659-3607 (pager).
Sincerely,
~ð-~
Michael L. Bill
Commissioner
BY ORDER OF THE COMMISSION
DATED this I/~ day of December, 2002
cc: Department ofFish & Game, Habitat Section w/o encl.
Department of Environmental Conservation w/o encl.
iJ.../ 6ft· II t¡ 10 1-..
12. Distance to nearest property line 13. Distance to nearest well
ADL 028263,12' MD No Close Approach
16. To be completed for deviated wells
Kick Off Depth 10945' MD Maximum Hole Angle
18. Casin~ Program Specifications
Size
Hole Casina Weiaht Grade Couplina
3-3/4" 3-3116" x 2-7/8" 6.2#/6.16# L-80 ST-L
^', STATE OF ALASKA
ALASKA t AND GAS CONSERVATION COM\,. 'I:~ION
PERMIT TO DRILL
20 AAC 25.005
1 b. Type of well IJ Exploratory IJ Stratigraphic Test B Development Oil
IJ Service IJ Development Gas IJ Single Zone IJ Multiple Zone
5. Datum Elevation (DF or KB) 10. Field and Pool
RKB = 83.4' Prudhoe Bay Field I Prudhoe
6. Property Designation Bay Pool
ADL 028262
7. Unit or Property Name
Prudhoe Bay Unit
8. Well Number /
W-19AL1
9. Approximate spud daJe
12/18/02/ Amount $200,000.00
14. Number of acres in property 15. Proposed depth (MD and TVD)
2560 13225' MD / 8836' TVDss
o 17. Anticipated pressure {see 20 AAC 25.035 (e) (2)}
95 Maximum surface 2294 psig, At total depth (TVD) 8800' / 3350 psig
Setting Depth
Top Bottom Quantitv of Cement
Lenath MD TVD MD TVD (include staae data)
2275' 10950' 8779' 13225' 8836' Uncemented Slotted Liner /'
Multilateral /
1 a. Type of work 0 Drill B Redrill
IJ Re-Entry IJ Deepen
2. Name of Operator
BP Exploration (Alaska) Inc.
3. Address
P.O. Box 196612, Anchorage, Alaska 99519-6612
4. Location of well at surface
~þ ~SNL, 1181' WEL, SEC. 21, T11N, R12E, UM
6fV At top of productive interval
4372' NSL, 3366' WEL, SEC. 16, T11 N, R12E, UM
At total depth
4933' NSL, 12' WEL, SEC. 17, T11 N, R12E, UM
11. Type Bond (See 20 AAC 25.025)
Number 2S100302630-277
19. To be completed for Redrill, Re-entry, and Deepen Operations.
Present well condition summary
Total depth: measured 14500 feet Plugs (measured)
true vertical 9092 feet
Effective depth: measured 14406 feet Junk (measured)
true vertical 9065 feet
Casing Length Size Cemented
Structural
Conductor
Surface
Intermediate
Production
Liner
Liner
MD
TVD
110' 20"
2692' 13-3/8" 3723 cu ft Cold set II
10463' 9-5/8" 2392 cu ft Class 'G'
627' 7" 174 cu ft Class 'G'
3721' 4-1/2" 528 cu ft Class 'G'
110'
2692'
10463'
110'
2687'
8417'
10308' - 10935'
RECÈ17VÊ095'
8307' - 8768'
8646' - 9091'
Perforation depth: measured
11154'-13930' (20 Intervals)
DEC 0 6 2002
20. Attachments
Alaska Oil & Gas Cons. Commission
B Filing Fee IJ Property Plat B BOP Sketch IJ Diverter ~ft!Wrl&tQrilling Program
B Drilling Fluid Program IJ Time vs Depth Plot IJ Refraction Analysis 0 Seabed Report IJ 20 AAC 25.050 Requirements
Contact Engineer Name/Number: Thomas McCarty, 223-7156 Prepared By Name/Number: Terrie Hubble, 564-4628
21. I hereby certify that the foregoing is true and correct to the best of my knowledge
Signed Thomas McCart. / ¿-=s /",r? ';¿ . ,.~~Ie ,c~ Dnl~ing Engin~r
'. '.",.\ (~'$SI,9"',"'se"Qnly,~,.."", ;',:~, ",:"
Permit Number API Number ARProral qaJ.e.~ See cover letter
-2.. ~ - Z 3 .5' 50- 029-22006-60 12- I' } () ¿,.- for other reauirements
Conditions of Approval: Samples Required 0 Yes ~ No Mud Log Required 0 Yes ~ No
Hydrogen Sulfide Measures rBI Yes 0 No Directional Survey Required IE Yes 0 No
Required Working Pressure for BOPE 0 2K 0 3K 0 4K 0 5K 0 10K 0 15K 0 3.5K psi for CTU
Other:Ti-S1- 1:>' PE to ~500 P s.l ,
true vertical
8904' - 9016' (20 Intervals)
.' Date /L¿'/~ L
Approved By
Form 10-401 Rev. 12-01-85
ORIGINAl SIr',Ns:n J1J c-, Commi~si~ner
M l. Bill r L ~ P r ,\. i
by order of
the commission
Date
12]11 02--
Submit In -riplicate
')
)
Summary of Operations: I'
A CTD through tubing lateral is planned for W-19A. The coiled tubing sidetrack, W-19AL 1, will exit the 4-
1/2" liner in the Sag River formation and target upper Zone 4. Prior to CTD sidetracking the well, a
retrievable through tubing whipstock and retriev~le packer will be set. The XN nipple and window will be
mi lied with coil. Approximately 2280' of 3-3/4" open hole is planned to açcess the Ivishak, Zone 4 target.
The well will be completed with an un-cemented, solid and slotted line~Once the liner is in place the
whipstock and packer will be retrieved in order to retain production from the existing perforations.
BP
W-19AL 1 CTD Sidetrack
Phase 1: Prep work. Planned for December 10, 2002. /"
1. M IT tubing and Casing
2. Drift tubing and Casing
3. Eline to install retrievable bridge plug at 1 :ke6~
4. Eline to install retrievable whipstock a),,-õ~,
5. Mill XN nipple and window with servic~ÍI, time permitting.
,r"
Phase 2: Mill window, Drill and Complete sidetrack: Planned for December 18,2002. /'
Drilling coil will be used to mill the XN and window in the 4-1/2" liner if service coil could not mill the
window in Phase 1. Drilling coil will then drill and complete the directional hole as per attached plan.
Maximum hole angle is planned for 96 degrees. The lateral will be completed with a 2 7/8" x 33/16" 1'/
un-cemented solid and slotted liner. The liner top will be left outside the window. Resistivity logs will
be run in the open hole in addition to MWD gamma ray. Finally, the whipstock and bridge plug will be
retrieved.
Mud Program:
· Phase 1: 2% KCI and 2ppb Biozan for milling.".,
· Phase 2: Drill with Flo-Pro (8.6 - 8.7 ppg) ,"
Disposal:
· All drilling and completion fluids and all other Class \I wastes will go to Grind & Inject or Pad 3.
· All Class I wastes will go to Pad 3 for disposal.
Casing Program: /i
The production liner will be 27/8" ST-L slotted liner from TD to approx. 11,100' MD, where it will be
crossed over to solid 3 3/16" liner. Desired top of 3 3/16" liner will be at approx. 1 O,950'md left outsid~~
the window. Leaving the lateral liner outside the window will preserve access to the existing perforations.
Use of the 3-3/16" liner will preserve future sidetrack options.
Well Control:
· BOP diagram is attached. /'
· Pipe rams, blind rams and the CT pack-off will be pressure tested to 400 psi and to 3500 psi.
· The annular preventer will be tested to 400 psi and 2500 psi.
Directional
· See attached directional plan, 2280' planned horizontal. Max. planned hole angle is approx. 96deg.
· Magnetic and inclination surveys will be taken every 30 ft. No gyro will be run.
Logging
· An MWD Gamma Ray will be run over the entire open hole section. Resistivity will also be. run in the
open hole.
Hazards /
· The most recent H2S test on W-19 was 10ppm on 8/16/00.
· Lost circulation risk is considered medium, three faults will be crossed along the wellbore.
)
')
Reservoir Pressure
Pore pressure is estimated to be 3350 at 88QO'TVDss (7.3 ppg emw). Maximum surface pressure with
gas (0.12 psi/ft) to surface is 2294 psi. /'
TREE = 4-1/16" CIW/FMC
, WB..LHEAD = 13-518" FMC
·Ã(5TijÃTÓR..;..·····m...m.m··..·BÃï<ï~Fi
KB.'ï~Lï3i = ........ aÔ.25'
BF=:·"ELË\¡ = ....··54.15'
'Kor=' .... 151'1)'
'M8x"Ärlgïe "= ^ '96@ 116ÖO'
^Datum MD =' ,. ·^····f;¡T17'
ÔäiûITì'TVÕ;;'^"w "Bäao' 55
')
W-19A L 11
Proposed CTD Sidetrack
~ J
2111' 1-14-112"HESXNIP,ID=3.813" I
"
SAFl. i~OTES: 700@ 11349' AND900@ 11473'
13-3/8" CSG, 68#, L-80, ID = 12.415" l-i 2692' ~ ~
GAS LIFT MANDRB..S
ST MD TVD DEV TYPE VLV LATCH PORT DATE
Minimum ID = 3.725" @ 10767' 6 3071 2975 11 CA- Mrv1G RK
5 5398 4798 48 CA-MMG RK
4-1/2" HES XN NIPPLE 4 7154 5998 50 CA-Mrv1G RK
L 3 8489 6898 46 CA-MMG RK
2 9586 7690 42 CA-Mrv1G RK
1 10191 8135 43 CA-Mrv1G RK
I TOP OF 7" LNR 1-1 10308'
I TOP OF CEMENT l-i 10468'
9-518" CSG, 47#, L-80, ID = 8.681" 1-1 11560'
I
.
I
MILLOUT WINDOW
10463' - 10513'
I 11305' I-iPlacement of CT-6 Sleeve
PERFORA TION SUMMARY
REF LOG: SWS MVVD MEM RES ON 11129198
A NGLE AT TOP PERF: 95 @ 11665'
Note: Refer to Production DB for historical perf data
DATE
11/11102
11/11102
11111102
11/11102
11/11102
12/24198
12/24198
11/11/02
12/24/98
12124/98
12/24/98
12/24/98
04/28101
04/28101
04128101
04/28/01 ~/
PBID l-i 14406' I
Note: Whipstock and bridge plug will be retrieved. (not shown) /
4-112" LNR, 12.6#, L-80, 0.0152 bpf, ID = 3.953" l-i 14495'
SIZE SPF INTERV A L Opn/Sqz
2-718" 4 11154 - 11204 0
2-718" 4 11220 - 11236 0
2-718" 4 11250 - 11360 0
2-718" 4 11410 - 11500 0
2-718" 4 11530 - 1161 0 0
2-718" 4 11665 - 11750 0
2-718" 4 12010 - 12090 0
2-718" 4 12100 - 12200 0
2-718" 4 12690 - 12800 0
2-718" 4 12920 - 13000 0
2-718" 4 12780 - 13900 0
2-718" 4 13910 - 13980 0
2-718" 4 11929 - 11960 0
2-718" 4 11844 - 11875 0
2-7/8" 4 12520 - 12545 0
2-7/8" 4 12560 - 12580 0
DATE
1990
12/25/98
02/13/01
03/05101
03104102
REV BY COMMENTS
J.JONES ORIGINAL COMA..ETlON
SIDETRACKED
SIS-QAA CONVERTED TO CANVAS
SIS-LG FINAL
RNITP CORRECTIONS
z
1
Z_I
1
I
10746' 1-14-1/2" HES X NIP, ID = 3.813" I
10767' 1-14-1/2" HES XN NIP, ID = 3.725" I
10712' 1-14-1/2" HES X NIP, ID = 3.813" I
10723' 1-17" X 4-1/2" BKR S-3 PKR, ID = 3.875" I
I
-'
1 10774' 1-14-1/2" TBG, 12.6#, L-80, 0.0152 bpf, ID = 3.958"
~ 10935' 1-17" LNR, 26#, L-80, 0.0383 bpf, ID = 6.276"
~0950' I-jTOP of 3-3/16" liner I
/1 10960'1-1 3.5" XN Nip I
) 11100'1-1 3-3/16" x 2-7/8" crossover I
000000000000001
12-718" L-80 Pre-drilled Liner 1-113225' I
13-3/4" Open Hole 1
IiiIìi;i;i¡j;j,
-
~
DATE
REV BY
COMMENTS
PRUDHOE BAY UNIT
WB..L: W-19A
PERMIT No: 198-1990
API No: 50-029-22006-01
SEC 21 , T11 N, R12E
BP Exploration (Alaska)
Plan: Plan #11 (W-19IPlan#11 W-19AL
Created By: Brij Potnis Dale: 121312002
Contact ~nforma!jüÎ::
~~~~~: (~~Zbît~~:~~~eq.GOm
Bake-:- Hug~les iN!EQ: (907) 267-6ß:JO
Azimuths to True North
Magnetic North: 25.79"
Magnetic Field
Strength: 57515nT
Dip Angle: 80.77"
Date: 12/3/2002
Model: BGGM2002
T
AM
4
LEGEND
~:1~ ~:1~1)
Plan#11 W-19AL
Plan #11
II..
'.
I
I
I
L-:-_ .'
~NrE()
I
lrp
BP Amoco
WELLPATH DnArLS
P=~1
'.,ent W.llp.øu W-1'A
n. on MD: 1OM1.T7
Rlgl W·18A UAOtl
Ref. D.tuma
V.SKtIon O+~~. ~.=: :::~;tD
Angl.
2.IS.OO· 0.00 0.00 0.00
REFERENCE INFORMATION
(;(H)rdinate (NÆ¡ Reference: Well Centre: W-19. True North
Vertical (TVD Reference: System: Mean Sea Level
Section (VS Reference: Slot - 19 (O.OON,O.OOE)
Measured Depth Reference: W-19A 83.40
Calculation Method: Minimum Curvature
SECTION DlnA....
Ad TVD ....... .EI-W DLet TJ'ace va.c Tal'J.'
3:34.30 ........ 4.f4..... ...2140'" 0.00 0.00 3412..H
334A2. ...2AO "111.U -2141.77 10.51 13.53 3414.07
3w..A.2 1707.1' ...:ze.oo ...2147.51 '.00 0.00 34.23.01
334..42 "25.77 514&.48 -2251.'7 15.00 0.00 358100
UO.1' "".31 sne.u _328.17 15.00 2....00 SH4.A7
27t.Sf .....01 5311.07 -21ðD.55 12..00 287.00 UII.oa
5i:n ::~:n 5itn 5:;: ~~ JJ= m¡:;¡
273.33 11'0.12 S!lU.D 43toM 12..00 270.00 4114.52:
~¡~ iili~ ~!i ~]~~ !~]~ ~~~
ANNOTATJONS TAAGETDETAI..S
N."... 1VD ....05 ..EI.JN
Iii I" , ~ II
"0 MØ r,.o
1 10....1.71 41.0'
2 10845.00 41A2
3 10M,.00 43.22
.. 1 t21t.53 UAO
. 11111.13 ".10
. 11114.53 11.17
: Hi::: =:=
to 11410.00 10.00
U u::::: ~::~
un::::: :;::
15 1'2U.OO 1S.10
~
:35 PM
12/3/2002
Vertical Section at 286.00° [100ft/in]
'"-
-
p""",,",
::=
""""'"
~
~.
KO,
1
nHu
niL
~AD nAB
~N
4
5
.
:- -
10
~~
TD
2700 2800 2900 3000 3100 3200 3300
TVD MO
101.00 1OV2e.e1
lut.11 10941.77
1112AO 10945.00
1701.111OMS.GO
1701.00 1011I7 AO
.a~ 11141.13
1111.00 11115.72
1125.76 11231.53
1.50.00 11477.44
IU1.31 11 "".53
esu.oe 11174.53
1170.32 11819.'"
1170.32 12140.00
. _--8IZG.32..J..2:34Q..ØQ
1S 1870,3212410.00
11 eaaa.33 12815.00
17 11151.50 12.140.00
~: :~:eag::
ZO 1135.51 13U5.oo
7900
8100
-
C
.- 8200
=
g 8300
...
;8400
..
2'8500
CI
- 8600
ca
U
1: 8700
G.I
> 8800
G.I
::I 8900
..
...
9000
8000
9100
9200
9300
)
)
ii.
BA
M 1:5
.................................I>H,...
IN'f.EQ
bp
BP
Baker Hughes INTEQ Planning Report
Company: BP Amoco
Field: Prudhoe Bay
Site: PBW Pad
Well: W-19
Wellpath: Plan#11 W-19AL 1
---.------
Date: 12/3/2002 Time: 13:35:32 Page:
Co-ordinate(NE) Reference: Well: W-19, True North
Vertical (TVD) Reference: System: Mean Sea Level
Section (VS) Reference: Well (0.00N,O.00E,286.00Azi)
Survey Calculation Method: Minimum Curvature Db: Oracle
-_._-----~._._-.__._..
Field: Prudhoe Bay
North Slope
UNITED STATES
Map System:US State Plane Coordinate System 1927
Geo Datum: NAD27 (Clarke 1866)
Sys Datum: Mean Sea Level
Map Zone:
Coordinate System:
Geomagnetic Model:
Alaska, Zone 4
Well Centre
BGGM2002
---.---.-,-.....--,----
-.--..--..--.--..,..----.------
-.-,-----.--.----------.-
----------"-------.---..--------.
-----_._-------~-----_.,----_._.._._,--,,-
-.-..--------------,--.
Site: PB W Pad
TR-11-12
UNITED STATES: North Slope
Site Position: Northing:
From: Map Easting:
Position Uncertainty: 0.00 ft
Ground Level: 47.83 ft
5957194.18 ft
609919.18 ft
Latitude:
Longitude:
North Reference:
Grid Convergence:
70 17 31.506 N
149 6 36.343 W
True
0.84 deg
---------'".--.--..-.--,--,.-.-
--...----..-----------,.--.-..------
------
----.-.-----,------
Well: W-19 Slot Name:
W-19
Well Position: +N/-S 2334.47 ft Northing: 5959559.86 ft Latitude:
+E/-W 2165.54 ft Easting: 612050.17 ft Longitude:
Position Uncertainty: 0.00 ft
19
70 17 54.463 N
149 5 33.215 W
-.".-..--...----.----...,-------...--.....----.---"'"'--
____,_~____".,_.._._,_______.____._._..._.n..._...~_._...._.'"_____~_._.____.._.____,,___._~_.__~__.._____.____
___._,,_.,..._.___..._.__'"_.__.___...__._.._____..__._._~__·____··_______..·_____m_
-'_._-_......_~--~----,-------
--.-.----.--.-----.-------
---.-.--------.-.
Wellpath: Plan#11 W-19AL 1
500292200660
Current Datum: W-19A
Magnetic Data: 12/3/2002
Field Strength: 57515 nT
Vertical Section: Depth From (TVD)
ft
0.00
Drilled From:
Tie-on Depth:
Height 83.40 ft Above System Datum:
Declination:
Mag Dip Angle:
+N/-S +E/-W
ft ft
._---------,--------~-,-_.__._---_.._--~.__._--,-_.__.-.-....---
0.00 0.00
W-19A
1 0941 .77 ft
Mean Sea Level
25.79 deg
80.77 deg
Direction
deg
---_.,--""_.._--_.._---~.._.~."..__.__._-----------_..------------
286.00
-,..__.._._.._._.._-~-,_._--_.- .-...-..,--
_._._.._._,.,.-..~"_..._._,..__..~-,,.- _.__."_._.~----_.__._------_._-----_._.._-----_._--,----~...,-
Targets
__..____.____.._ .._.."'__".~._,,.,,_.._..'"__.,___..,_.....,____.__....._~_.____.___~__.._....__..______._n"_._____'..,..__....""__.._..____._."__._ _. _...__._.__...._..........___._. .. _____._........_..___.._...._.._._......__._...___._,~."..._...___....__._..._,_.~.~...~.._.___...__.,..______._....._..__m_".......~_._~,_.__._._._
Map Map <--- Latitude ---> <--- Longitude -->
Name Description TVD +N/-S +E/-W Northing Easting Deg Min Sec Deg Min Sec
Dip. Dir. ft ft ft ft ft
--------......--------.---------.---- .-.---.-.--.--.
W-19AL 1 Polygon11.1 0.00 5293.68 -2179.68 5964820.00 609792.00 70 18 46.523 N 149 6 36.799 W
-Polygon 1 0.00 5293.68 -2179.68 5964820.00 609792.00 70 18 46.523 N 149 6 36.799 W
-Polygon 2 0.00 5477.94 -2462.99 5965000.00 609506.00 70 18 48.334 N 149 6 45.066 W
-Polygon 3 0.00 5690.22 -3552.04 5965196.01 608414.00 70 18 50.418 N 149 7 16.838 W
-Polygon 4 0.00 5613.04 -3742.23 5965116.01 608225.00 70 18 49.658 N 149 7 22.386 W
-Polygon 5 0.00 5826.24 -4289.16 5965321.01 607675.00 70 18 51.751 N 149 7 38.345 W
-Polygon 6 0.00 5660.28 -4361.64 5965154.00 607605.01 70 1850.119 N 149 740.456 W
-Polygon 7 0.00 5482.16 -3953.22 5964982.01 608016.00 70 18 48.369 N 149 7 28.539 W
-Polygon 8 0.00 5523.92 -3802.57 5965026.00 608166.00 70 18 48.781 N 149 7 24.145 W
·Polygon 9 0.00 5264.57 -2508.18 5964786.00 609464.00 70 18 46.235 N 149 646.382 W
-Polygon 1 0 0.00 5062.70 -2251.14 5964588.00 609724.00 70 18 44.251 N 149 6 38.882 W
-Polygon 11 0.00 5076.73 -2118.90 5964604.00 609856.01 70 18 44.389 N 149 6 35.025 W
W-19AL 1 Fault 1 0.00 5779.07 -2534.51 5965300.00 609430.00 70 18 51.295 N 149 647.155 W
-Polygon 1 0.00 5779.07 -2534.51 5965300.00 609430.00 70 18 51.295 N 149 6 47.155 W
-Polygon 2 0.00 4998.64 -2516.14 5964520.00 609460.00 70 18 43.620 N 149 6 46.612 W
W-19AL 1 Fault 2 0.00 5733.39 -2825.25 5965250.01 609140.00 70 18 50.845 N 149 6 55.636 W
-Polygon 1 0.00 5733.39 -2825.25 5965250.01 609140.00 70 18 50.845 N 149 6 55.636 W
-Polygon 2 0.00 5192.96 -2803.30 5964710.01 609170.01 70 18 45.530 N 149 6 54.990 W
W-19AL 1 Fault 5 0.00 5553.98 -4208.20 5965050.01 607760.00 70 18 49.074 N 149 7 35.978 W
-Polygon 1 0.00 5553.98 -4208.20 5965050.01 607760.00 70 18 49.074 N 149 7 35.978 W
-Polygon 2 0.00 5773.23 -4154.92 5965270.01 607810.00 70 18 51.231 N 149 7 34.428 W
W-19AL 1 Fault 4 0.00 5628.01 -3807.01 5965130.01 608160.00 70 18 49.804 N 149 7 24.276 W
-Polygon 1 0.00 5628.01 -3807.01 5965130.01 608160.00 70 18 49.804 N 149 7 24.276 W
-Polygon 2 0.00 5506.82 -3728.80 5965010.01 608240.00 70 18 48.613 N 149 7 21 .993 W
W-19AL 1 Fault 3 0.00 5679.36 -3226.13 5965190.01 608740.00 70 18 50.312 N 149 7 7.331 W
-Polygon 1 0.00 5679.36 -3226.13 5965190.01 608740.00 70 18 50.312 N 149 7 7.331 W I
-Polygon 2 0.00 5302.35 -3431.79 5964810.00 608540.00 70 18 46.603 N 149 7 13.325 W
~--------_. --.- -,-, ---.----.-- ,- --" . '-"- u_ __._.__._. ___._____...______.._,____.____..__._.___.__~_ --.-------- -- -----------"._._----~------_.._-_._--_._"._~---..----
-...---.---.-..-..
. tip
)
)
.
84
MUGHIS
lNTEQ
BP
Baker Hughes INTEQ Planning Report
--.----.-.
_._"._-----_.~----~.-
Company: BP Amoco
Field: Prudhoe Bay
Site: PB W Pad
Well: W-19
Wellpath: Plan#11 W-19AL 1
Targets
--------
Name
Date: 12/3/2002 Time: 13:35:32 Page: 2
Co-ordinate(NE) Reference: Well: W-19, True North
Vertical (TVD) Reference: System: Mean Sea Level
Section (VS) Reference: Well (0.00N,O.OOE,286.00Azi)
Survey Calculation Method: Minimum Curvature Db: Oracle
-.-----.
-------.--.--.------.-
Description
Dip. Dir.
Map
Northing
ft
<--- Latitude ----> <--- Longitude -->
Deg Min Sec Deg Min Sec
Map
Easting
ft
TVD
ft
+N/-S
ft
+E/-W
ft
--_..._---._._.._~.._.._----~~-_._-~
W-19AL 1 T11.5 8835.00 5631.60 -4115.02 5965129.01 607852.00 70 18 49.838 N 149 7 33.261 W
W-19AL1 T11.1 8860.00 5362.53 -2503.71 5964884.00 609467.00 70 18 47.199 N 149 6 46.253 W
W-19AL1 T11.4 8860.00 5570.51 -3773.86 5965073.01 608194.00 70 18 49.239 N 149 7 23.308 W
W-19AL1 T11.2 8870.00 5403.95 -2800.15 5964921.00 609170.00 70 18 47.605 N 149 6 54.901 W
W-19AL1 T11.3 8870.00 5533.60 -3378.34 5965042.01 608590.00 70 18 48.878 N 149 7 11.769 W
_._._--_._.__.~._--._--_....._~.._- _._--_._-~-~------
Annotation
-_.__..._--_."_._.._--~-_.._.__._...__..-_.._...._-_._._.-.._.._._._--,,_.._......__....---_._-,,---_.._-_.._~.- .~.._-_.._._....._------..._._-.----_._--_.".__.__._._....----....----... . ..._---_.._---_.---..._._._._...__._.__..._.._-_._-~._....---.-----.-..-.----.--,-...--.--.---
MD
ft
10929.89
10941.77
10945.00
10965.00
10967.49
11141.93
11195.72
11239.53
11477.44
11599.53
11674.53
11889.99
12140.00
12340.00
12490.00
12615.00
12840.00
12890.00
13090.00
13225.00
TVD
ft
8681.00
8689.98
8692.40
8707.19
8709.00
8804.00
8819.00
8825.76
8850.00
8861.39
8866.06
8870.32
8870.32
8870.32
8870.32
8868.33
8861.50
8860.09
8847.86
8835.51
TSGR
TIP
KOP
1
TSHU
TElL
TSAD 1 TZ4B
2
45N
3
4
5
6
7
8
9
10
11
12
TD
-----.----.--.--.---.--- ._---_.~--
--..---.--.-..,,---.--....--.----
.---------.--..-.--..
----------.-..--.-..-.---------...-.------.-.-.-.-.
---_..._~._"----_.~...__...-
-~--_._._.._--_._----
.______._.____.__w~_____·_____w___
Plan: Plan #11
Identical to Lamar's Plan #11
Principal: Yes
Date Composed:
Version:
Tied-to:
12/3/2002
3
From: Definitive Path
----.----.----
Plan Section Information
_.._---------~--_.__._._.._------......._._._- .---..-.-.-----...----- .~-_._._---_..-_._--_.._._._._._.._._--."_.._---_.__.-_....__._-_.._--_..-----_.._----_..~. _.~-_......----_..__....__._--"----_.----..-._~_..__._... -.------- --.--.----..-.---..-.--.---"-
MD Incl Azim TVD +Nl-S +E/-W DLS Build Turn TFO Target
ft deg deg ft ft ft deg/100ft deg/1000 deg/100ft deg
.~---~.._.._.".. ---------._--_......_--_.~..__.~_..._._.---_..._-_..._.--~~~,,-----~ ----_._.~._._.~-_.._._-~_._--~-------.~.__..".-_._._.---_.__._---_._----_.__.~--------_.-
10941.77 41.09 334.30 8689.98 4914.94 -2140.85 0.00 0.00 0.00 0.00
10945.00 41 .42 334.42 8692.40 4916.86 -2141.77 10.51 10.22 3.72 13.53
10965.00 43.22 334.42 8707.19 4929.00 -2147.58 9.00 9.00 0.00 0.00
11239.53 84.40 334.42 8825.77 5146.46 -2251.67 15.00 15.00 0.00 0.00
11599.53 85.10 280.18 8861.39 5355.43 -2526.17 15.00 0.19 -15.07 268.00
11674.53 87.77 271.57 8866.06 5363.07 -2600.55 12.00 3.57 -11.48 287.00
11889.99 90.00 297.33 8870.32 5416.39 -2807.38 12.00 1.03 11.96 85.40
12140.00 90.00 267.33 8870.32 5469.18 -3048.84 12.00 0.00 -12.00 270.00
12340.00 90.00 291.33 8870.32 5501.38 -3244.76 12.00 0.00 12.00 90.00
12490.00 90.00 273.33 8870.32 5533.29 -3390.69 12.00 0.00 -12.00 270.00
12615.00 91.81 288.23 8868.33 5556.59 -3513.12 12.00 1.45 11.91 83.00
12840.00 91.61 261.21 8861.50 5574.92 -3735.19 12.00 -0.09 -12.01 270.00
12890.00 91.60 267.22 8860.09 5569.89 -3784.89 12.00 -0.02 12.00 90.00
13090.00 95.32 290.98 8847.86 5601.13 -3980.57 12.00 1.86 11.88 80.50
13225.00 95.10 274.71 8835.51 5630.91 -4111.21 12.00 -0.16 -12.05 270.00
--_._._-_.~-_._-_._-_.----_..._..._---_. -.---.".--.- -."-----..-----
') ) ..
BP BAK'
HUGHES
Baker Hughes INTEQ Planning Report lNTEQ
--_._.~._~_..__."---_..-.- .--..--.-.----
COO1pany: BP Amoco Date: 12/3/2002 Time: 13:35:32 Page: 3
Field: Prudhoe Bay Co-ordinate(NE ) Reference: Well: W-19, True North
Site: PB W Pad Vertical (TVD) Reference: SY$tem: Mean Sealevel
Well: W-19 Section (VS) Reference: Well (0.00N,O.00E,286.00Azi)
Well path: Plan#11 W-19Al1 Survey Calculation Method: Minimum Curvature Db: Oracle
Survey
_._-_.----_._------_._.__._-----,,-_.._..._.._-~_._..--.-.--..-.---- "...__.---_.__..__.._.._-~._.-------_..._----
MD IncI Azim SSTVD N/S EIW MapN MapE VS DLS TFO Tool
ft deg deg ft ft ft ft ft ft deg/100ft deg
10929.89 40.74 333.91 8681.00 4907.94 -2137.45 5964434.97 609839.97 3407.46 0.00 0.00 TSGR
10941.77 41.09 334.30 8689.98 4914.94 -2140.85 5964441.92 609836.47 3412.66 3.68 36.31 TIP
10945.00 41 .42 334.42 8692.40 4916.86 -2141.77 5964443.82 609835.52 3414.07 10.51 13.53 KOP
10950.00 41.87 334.42 8696.14 4919.86 -2143.20 5964446.80 609834.04 3416.28 9.00 0.00 MWD
10965.00 43.22 334.42 8707.19 4929.00 -2147.58 5964455.88 609829.53 3423.01 9.00 0.00 1
10967.49 43.59 334.42 8709.00 4930.55 -2148.32 5964457.41 609828.76 3424.14 15.00 0.00 TSHU
10975.00 44.72 334.42 8714.39 4935.27 -2150.58 5964462.09 609826.44 3427.62 15.00 360.00 MWD
11000.00 48.47 334.42 8731.56 4951.65 -2158.42 5964478.35 609818.35 3439.67 15.00 0.00 MWD
11025.00 52.22 334.42 8747.51 4969.00 -2166.73 5964495.58 609809.79 3452.44 15.00 0.00 MWD
11050.00 55.97 334.42 8762.17 4987.27 -2175.47 5964513.71 609800.77 3465.88 15.00 0.00 MWD
11075.00 59.72 334.42 8775.48 5006.35 -2184.61 5964532.66 609791.35 3479.92 15.00 0.00 MWD
11100.00 63.47 334.42 8787.37 5026.18 -2194.10 5964552.35 609781.57 3494.51 15.00 0.00 MWD
11125.00 67.22 334.42 8797.79 5046.67 -2203.91 5964572.69 609771.46 3509.59 15.00 0.00 MWD
11141.93 69.76 334.42 8804.00 5060.88 -2210.71 5964586.79 609764.45 3520.04 15.00 0.00 TEll
11150.00 70.97 334.42 8806.71 5067.74 -2213.99 5964593.59 609761.06 3525.08 15.00 360.00 MWD
11175.00 74.72 334.42 8814.09 5089.28 -2224.31 5964614.98 609750.43 3540.93 15.00 0.00 MWD
11195.72 77.83 334.42 8819.00 5107.43 -2232.99 5964632.99 609741.47 3554.29 15.00 0.00 TSAD 1 T
11200.00 78.47 334.42 8819.88 5111.21 -2234.80 5964636.75 609739.61 3557.07 15.00 360.00 MWD
11225.00 82.22 334.42 8824.07 5133.44 -2245.44 5964658.81 609728.64 3573.43 15.00 0.00 MWD
11239.53 84.40 334.42 8825.77 5146.46 -2251.67 5964671.73 609722.21 3583.00 15.00 0.00 2
11250.00 84.35 332.84 8826.79 5155.79 -2256.30 5964681.00 609717.45 3590.02 15.00 268.00 MWD
11275.00 84.24 329.08 8829.28 5177.53 -2268.37 5964702.56 609705.05 3607.62 15.00 268.15 MWD
11300.00 84.15 325.31 8831.81 5198.43 -2281.85 5964723.25 609691.27 3626.34 15.00 268.53 MWD
11325.00 84.10 321.54 8834.37 5218.40 -2296.66 5964742.99 609676.16 3646.08 15.00 268.91 MWD
11350.00 84.06 317.77 8836.95 5237.35 -2312.76 5964761.70 609659.78 3666.78 15.00 269.30 MWD
11375.00 84.06 314.00 8839.53 5255.20 -2330.07 5964779.29 609642.22 3688.33 15.00 269.69 MWD
11400.00 84.07 310.23 8842.12 5271.87 -2348.51 5964795.68 609623.53 3710.66 15.00 270.08 MWD
11425.00 84.12 306.46 8844.69 5287.29 -2368.01 5964810.81 609603.80 3733.65 15.00 270.47 MWD
11450.00 84.18 302.69 8847.24 5301.40 -2388.48 5964824.61 609583.12 3757.22 15.00 270.85 MWD
11475.00 84.28 298.92 8849.76 5314.14 -2409.84 5964837.03 609561.58 3781.27 15.00 271.24 MWD
11477.44 84.29 298.55 8850.00 5315.31 -2411.98 5964838.16 609559.43 3783.64 15.00 271.62 45N
11500.00 84.40 295.15 8852.22 5325.45 -2432.00 5964848.00 609539.26 3805.68 15.00 271.65 MWD
11525.00 84.54 291.39 8854.64 5335.28 -2454.85 5964857.49 609516.26 3830.36 15.00 271.99 MWD
11550.00 84.70 287.63 8856.98 5343.59 -2478.31 5964865.45 609492.68 3855.20 15.00 272.35 MWD
11575.00 84.89 283.87 8859.25 5350.34 -2502.27 5964871.84 609468.63 3880.09 15.00 272.70 MWD
11599.53 85.10 280.18 8861.39 5355.43 -2526.16 5964876.58 609444.66 3904.46 15.00 273.05 3
11600.00 85.11 280.12 8861.43 5355.51 -2526.63 5964876.65 609444.20 3904.93 12.02 286.88 MWD
11625.00 86.00 277 .25 8863.37 5359.28 -2551.26 5964880.05 609419.51 3929.65 12.00 287.00 MWD
11650.00 86.89 274.38 8864.92 5361 .80 -2576.08 5964882.20 609394.66 3954.20 12.00 287.23 MWD
11674.53 87.77 271.57 8866.06 5363.07 -2600.55 5964883.11 609370.18 3978.07 12.00 287.41 4
11675.00 87.78 271.62 8866.08 5363.09 -2601.02 5964883.11 609369.71 3978.53 11.84 85.24 MWD
11700.00 88.02 274.62 8866.99 5364.45 -2625.96 5964884.10 609344.75 4002.88 12.00 85.40 MWD
11725.00 88.27 277.61 8867.80 5367.11 -2650.81 5964886.39 609319.87 4027.49 12.00 85.29 MWD
11750.00 88.53 280.60 8868.50 5371.06 -2675.48 5964889.98 609295.15 4052.30 12.00 85.19 MWD
11775.00 88.78 283.59 8869.09 5376.29 -2699.91 5964894.85 609270.64 4077 .23 12.00 85.11 MWD
11800.00 89.04 286.58 8869.56 5382.80 -2724.05 5964900.99 609246.41 4102.22 12.00 85.04 MWD
11825.00 89.31 289.56 8869.92 5390.55 -2747.81 5964908.38 609222.54 4127.20 12.00 84.98 MWD
11850.00 89.57 292.55 8870.17 5399.53 -2771.13 5964917.02 609199.08 4152.10 12.00 84.94 MWD
11875.00 89.84 295.54 8870.29 5409.72 -2793.96 5964926.86 609176.11 4176.85 12.00 84.91 MWD
11889.99 90.00 297.33 8870.32 5416.39 -2807.38 5964933.33 609162.59 4191.59 12.00 84.89 5
11900.00 90.00 296.13 8870.32 5420.89 -2816.32 5964937.70 609153.59 4201.42 12.00 270.00 MWD
11925.00 90.00 293.13 8870.32 5431.31 -2839.04 5964947.78 609130.71 4226.14 12.00 270.00 MWD
11950.00 90.00 290.13 8870.32 5440.53 -2862.28 5964956.65 609107.34 4251.01 12.00 270.00 MWD
L__.,___ _.__..~_. __ .._ .___,.., ,_ -- _ -- --...." -------.- .---------..----,,-.- _",_ ,___.__u_____ __.__.__ _~__n___·__·_·_______ ..._
" ) ')
.bp BP
Baker Hughes INTEQ Planning Report '__,.."W""n"",·",·""',,,,MHI'N___"""''''''''''''''.
IN'I'.EQ
--"-~._-----,- ---"-"-- ------_.y.._._._.__..__.~..-
Company: BP Amoco Date: 12/3/2002 Time: 13:35:32 Page: 4
Field: Prudhoe Bay Co-ordinate(NE)· Reference: Well: W-19, True North
Site: PB W Pad Vertical (TVD) Reference: System: Mean Sea Level
Well: W-19 Section (VS) Reference: Well (0.00N,O.00E,286.00Azi)
Wellpath: Plan#11 W-19AL 1 Survey Calculation Method: Minimum Curvature Db: Oracle
Survey
--.-.---.------.----------....---.,--.---. --.-..-------....--.--.-...-----..---.--.-..------.-..-.-
MD Incl Azim SSTVD N/S E/W MapN MapE VS DLS TFO Tool
ft deg deg ft ft ft ft ft ft deg/100ft deg
11975.00 90.00 287.13 8870.32 5448.52 -2885.97 5964964.28 609083.54 4275.99 12,00 270.00 MWD
12000.00 90.00 284.13 8870.32 5455.25 -2910.04 5964970,65 609059.37 4300.98 12,00 270,00 MWD
12025.00 90.00 281.13 8870.32 5460.72 -2934.43 5964975.76 609034.90 4325,94 12.00 270.00 MWD
12050.00 90.00 278.13 8870.32 5464.90 -2959,08 5964979.57 609010.20 4350.78 12.00 270.00 MWD
12075.00 90.00 275.13 8870.32 5467.79 -2983.91 5964982.09 608985.33 4375.44 12.00 270.00 MWD
12100.00 90.00 272.13 8870.32 5469.37 -3008.85 5964983.30 608960.37 4399.86 12.00 270.00 MWD
12125.00 90.00 269.13 8870.32 5469.65 -3033.85 5964983.20 608935.37 4423.96 12.00 270.00 MWD
12140.00 90.00 267.33 8870.32 5469.18 -3048.84 5964982.51 608920.39 4438.25 12.00 270.00 6
12150.00 90.00 268.53 8870.32 5468.82 -3058.84 5964982.01 608910.41 4447.75 12.00 90.00 MWD
12175.00 90.00 271.53 8870.32 5468.84 -3083.83 5964981.65 608885.41 4471.79 12.00 90.00 MWD
12200.00 90.00 274.53 8870.32 5470.16 -3108.79 5964982.60 608860.44 4496.15 12.00 90.00 MWD
12225.00 90.00 277.53 8870.32 5472.79 -3133.65 5964984.85 608835.54 4520.77 12.00 90.00 MWD
12250.00 90.00 280.53 8870.32 5476.71 -3158.34 5964988.41 608810.80 4545.58 12.00 90.00 MWD
12275.00 90.00 283.53 8870.32 5481.92 -3182.79 5964993.25 608786.28 4570.52 12.00 90.00 MWD
12300.00 90.00 286.53 8870.32 5488.41 -3206.93 5964999.38 608762.05 4595.51 12.00 90.00 MWD
12325.00 90.00 289.53 8870.32 5496.14 -3230.70 5965006.76 608738.17 4620.49 12.00 90.00 MWD
12340.00 90.00 291.33 8870.32 5501.38 -3244.76 5965011.78 608724.04 4635.45 12.00 90.00 7
12350.00 90.00 290.13 8870.32 5504.92 -3254.11 5965015.18 608714.63 4645.41 12.00 270.00 MWD
12375.00 90.00 287.13 8870.32 5512.91 -3277.79 5965022.82 608690.83 4670.38 12.00 270.00 MWD
12400.00 90.00 284.13 8870.32 5519.64 -3301.87 5965029.19 608666.66 4695.38 12.00 270.00 MWD
12425.00 90.00 281 .1 3 8870.32 5525.11 -3326.26 5965034.29 608642.20 4720.33 12.00 270.00 MWD
12450.00 90.00 278.13 8870.32 5529.29 -3350.90 5965038.11 608617.49 4745.18 12.00 270.00 MWD
12475.00 90.00 275.13 8870.32 5532.18 -3375.73 5965040.62 608592.62 4769.84 12.00 270.00 MWD
12490.00 90.00 273.33 8870.32 5533.29 -3390.69 5965041.51 608577.65 4784.52 12.00 270.00 8
12500.00 90.15 274.52 8870.30 5533.97 -3400.67 5965042.04 608567.67 4794.30 12.00 83.00 MWD
12525.00 90.51 277.50 8870.16 5536.59 -3425.53 5965044.29 608542.77 4818.92 12.00 83.00 MWD
12550.00 90.88 280.48 8869.86 5540.50 -3450.22 5965047.83 608518.03 4843.73 12.00 83.02 MWD
12575.00 91.24 283.46 8869.40 5545.68 -3474.67 5965052.65 608493.51 4868.66 12.00 83.05 MWD
12600.00 91.59 286.44 8868.78 5552.12 -3498.81 5965058.73 608469.28 4893.64 12.00 83.11 MWD
12615.00 91.81 288.23 8868.33 5556.59 -3513.12 5965062.98 608454.90 4908.63 12.00 83.18 9
12625.00 91.81 287.03 8868.02 5559.62 -3522.65 5965065.87 608445.33 4918.62 12.00 270.00 MWD
12650.00 91.80 284.02 8867.23 5566.30 -3546.72 5965072.19 608421.16 4943.61 12.00 269.96 MWD
12675.00 91.79 281.02 8866.45 5571.72 -3571.11 5965077.25 608396.70 4968.55 12.00 269.87 MWD
12700.00 91.78 278.02 8865.67 5575.85 -3595.75 5965081.01 608372.00 4993.37 12.00 269.77 MWD
12725.00 91.76 275.02 8864.89 5578.69 -3620.58 5965083.48 608347.14 5018.02 12.00 269.68 MWD
12750.00 91.74 272.02 8864.13 5580.23 -3645.51 5965084.64 608322.18 5042.41 12.00 269.59 MWD
12775.00 91.71 269.02 8863.38 5580.45 -3670.50 5965084.49 608297.20 5066.49 12.00 269.50 MWD
12800.00 91.67 266.02 8862.64 5579.37 -3695.46 5965083.04 608272.26 5090.19 12.00 269.41 MWD
12825.00 91.64 263.01 8861.92 5576.98 -3720.33 5965080.28 608247.42 5113.44 12.00 269.32 MWD
12840.00 91.61 261.21 8861.50 5574.92 -3735.19 5965078.00 608232.61 5127.15 12.00 269.23 10
12850.00 91.61 262.41 8861.22 5573.50 -3745.08 5965076.43 608222.74 5136.27 12.00 90.00 MWD
12875.00 91.61 265.42 8860.51 5570.85 -3769.93 5965073.41 608197.93 5159.42 12.00 90.03 MWD
12890.00 91.60 267.22 8860.09 5569.89 -3784.89 5965072.22 608182.99 5173.54 12.00 90.12 11
12900.00 91.80 268.40 8859.80 5569.51 -3794.88 5965071.69 608173.01 5183.03 12.00 80.50 MWD
12925.00 92.29 271.36 8858.90 5569.45 -3819.86 5965071.27 608148.03 5207.03 12.00 80.54 MWD
12950.00 92.77 274.33 8857.80 5570.69 -3844.80 5965072.14 608123.08 5231.35 12.00 80.64 MWD
12975.00 93.25 277.29 8856.49 5573.22 -3869.63 5965074.29 608098.21 5255.92 12.00 80.77 MWD
13000.00 93.72 280.26 8854.96 5577.03 -3894.29 5965077.73 608073.50 5280.67 12.00 80.93 MWD
13025.00 94.18 283.23 8853.24 5582.10 -3918.71 5965082.44 608049.01 5305.54 12.00 81.11 MWD
13050.00 94.63 286.21 8851.32 5588.43 -3942.81 5965088.41 608024.82 5330.46 12.00 81.31 MWD
13075.00 95.06 289.19 8849.21 5596.01 -3966.54 5965095.63 608000.98 5355.35 12.00 81.54 MWD
13090.00 95.32 290.98 8847.86 5601.13 -3980.57 5965100.55 607986.88 5370.25 12.00 81.79 12
- --._.",----"--~,-,, ,,---- -~._._- --. ----_.,----,----,-- _""___'___u___ -. ---------.---. - --.- --...---- .--.------.-.-,,- ...-----.-.--.-,-,---..--
')
')
lB..
BAK'..
HUGHIS
·_,''''.,·,,''''.......·^'''~....''N''''''''"''''_
1.N'l'EQ
,bp
BP
Baker Hughes INTEQ Planning Report
---'---
---.--------..----,.-...---.-.---
-.-...---.---.-~~.-.---.'_.~.-_...~-.--
Company: BP Amoco
Field: Prudhoe Bay
Site: PB W Pad
Well: W-19
Wellpath: Plan#11 W-19AL1
Date: 12/3/2002 Time: 13:35:32 Page: 5
Co-ordinate(NE) Reference: Well: W-19, True North
Vertical (TVD) Reference: System: Mean Sea Level
Section (VS) Reference: Well (0.00N,0.00E,286.00Azi)
Survey Calculation Method: Minimum Curvature Db: Oracle
Survey
--------------....- .-.---.--.-..---.- --.---..---.----.----
MD Inel Azim SSTVD N/S E/W MapN MapE VS DLS TFO Tool
ft deg deg ft ft ft ft ft ft deg/100ft deg
-----.
13100.00 95.31 289.77 8846.93 5604.60 -3989.91 5965103.87 607977 .49 5380.18 12.00 270.00 MWD
13125.00 95.30 286.76 8844.62 5612.40 -4013.54 5965111.32 607953.75 5405.05 12.00 269.89 MWD
13150.00 95.27 283.74 8842.31 5618.95 -4037.56 5965117.51 607929.64 5429.94 12.00 269.61 MWD
13175.00 95.23 280.73 8840.02 5624.23 -4061.88 5965122.42 607905.24 5454.78 12.00 269.33 MWD
13200.00 95.17 277.72 8837.75 5628.22 -4086.46 5965126.05 607880.61 5479.50 12.00 269.06 MWD
13225.00 95.10 274.71 8835.51 5630.91 -4111.21 5965128.37 607855.83 5504.03 12.00 268.78 TD
)
All Measurements are from top of Riser
s-
ID
en
.-
c:::
top of bag
bUm of bag
middle of slips
Blind/Shears
..... ...... ...... ... .....
middle of pipes
2 -3/8" com b i ram/s Ii ps .........................
....--.,.
middle of flow cross
Mud Cross
............
middle of blind/shears
2-3/8" x 3-1/2" VBR pipe rams
~.
"--
.........................,
middle of pipe/slips
2-3/8" co m bi ram/s Ii ps .........................
Flow Tee
';,
)
12/5/2002
BAG
/
/
TOTs
Mud Cross
TOTs /
p 054963
DATE
INVOICE / CREDIT MEMO
11/18/02 INV# CKll1402D
THE ATTACHED CHECK IS IN PAYMENT FOR ITEMS DESCRIBED ABOVE.
BP EXPLORATION, (ALASKA) INC.
PRUDHOE BAY UNIT
PO BOX 196612
ANCHORAGE, AK 99519-6612
PAY
TO THE
ORDER
OF
DATE
11/18/02
CHECK NO.
P054963
DESCRIPTION
GROSS
VENDOR
DISCOUNT
NET
PERMIT TO DRILL FEE
~~v\
\J-)~
RECEIVE)
DEC 0 6 2002
A1~ka Oil·& Gas Gons. COlT l1isslon
- .' .' Anchorage
TOTAL ~
NATIONAL CITY BANK
Ashland. Ohio
No. p054 983
56-389
412
CONSOLIDATED COMMERCIAL ACCOUNT
B," ,,',.....p..' r." ·UOÞ lU'1
. ' ." ~.JL. uP'
AMOUNT
***** $1.00.00*****
4002>
. .". ."."..' . -. -
. - .-..". ---. -- - .'-
'-- ..- - - ...- - .- '". --- . .-.'
." .. ,'.'.', '. ....'. ' " u .
~ - -
. - - -.". -." .--'--- .-."-" .
N~~:!~~~~~:~~~.r~øti.~·~:~·~!;}·~·:.:;f~\~~G
····..:..·..·~~~~f...... ..;- ...... ............
;¿¿::f;:~:~ {$t~¥f};~;~:;;;¡i~~;t.A:~~
ALASKA OIL & GAS CONSERVATION.:
COMMISSION
333 W. 7th AVE, STE. 100
ANCHORAGE, AI< 99501
II· 0 5 ~ ~ b 3 II· I: 0 ~ ~ 20 :18 ~ 51: 0 ~ 2 ? 8 ~ b II·
H
-.....".-'
"-.
,)
)
TRANSMIT AL LETTER CHECK LIST
CIRCLE APPROPRIATE LETTER/PARAGRAPHS TO
BE INCLUDED IN TRANSMITTAL LETTER
WELLNAME/ð'a W~/rA¿)
PTD# 20¿- 2 .3S
CHECK WHAT
APPLIES
ADD-ONS
(OPTIONS)
MULTI
LATERAL
ý
(If API number
last two (2) digits
are between 60-69)
PILOT
(PH)
"CLUE"
The permit is for a new wellbore segment of
existing well ,oB G[ µ.) - /9' A
Permit No/''I'_I'' API No. .!'O..C".9.""_.2..øo.oc....¡
Production should continue to be reported as
a function of the original API number stated
above.
HOLE In accordance with 20 AAC 25.005(f), all
records, data and logs acquired for the pilot
hole must be clearly differentiated in both
name (name on permit plus PH)
and API num ber (50
70/80) from records, data and logs acquired
for well (name on permit).
SPACING
EXCEPTION
DRY DITCH
SAMPLE
Rev: 07/10/02
C\jody\templates
The permit is approved subject to full
compliance with 20 AAC 25.055. Approval to
perforate and produce is contingent upon
issuance of a conservation order approving a
spacing exception.
(Company Name) assumes the liability of any
protest to the spacing exception that may
occur.
All dry ditch sample sets submitted to the
Commission must be in no greater than 30'
sample intervals from below the permafrost
or from where samples are first caught and
10' sample intervals through target zones.
WELL PERMIT CHECKLIST COMPANY A,IJ)! WELL NAME,PA.c:.t (",¿)-!9A¿J PROGRAM: Exp _ Dev.2L Redrll_ Re-Enter _ Serv _ Wellbore seg.2:(
FIELD & POOL h 7'0/l; ò INIT CLASS .f)~ V / -ð'" / GEOL AREA <;? 1 r~ UNIT# II h, ( r::> ON/OFF SHORE ~
ADMINISTRATION 1. Permit fee attached. . . . . . . . . . . . . . . . . . . . . . . ry, N
2. Lease number appropriate. .. . . . . . . . . . . . . . . . . Y N
3. Unique well name and number. . . . . . . . . . . . . . . . . Y N
4. Well located in a defined pool.. . . . . . . . . . . . . . . . . Y N
5. Well located proper distance from drilling unit boundary. . . . Y N
6. W ell located proper distance from other wells.. . . . . . . . . Y N
APPR DATE 7. Sufficient acreage available in drilling unit.. . . . . . . . . . . Y N
¿1¿?J /~ Ja J 8. If deviated, is wellbore plat included.. . . . . . . . . . . . . . Y N
t:jl..£- ~/c?2.... 9. Operator only affected party.. . . . . . . . . . . . . . . . . . Y N
10. Operator has appropriate bond in force. . . . . . . . . . . . . Y N
11. Permit can be issued without conservation order. . . . . . . . Y N
12. Permit can be issued without administrative approval.. . . . . ~ N
(Service Well Only) 13. Well located wlin area & strata authorized by injection order #_ '!.)!. ,/f./~I;.
(Service Well Only) 14. All wells wlin X mile area of review identified. . . . . . . . ., Y N
ENGINEERING 15. Conductor string provided. . . . . . . . . . . . . . . . . . . '¥--'N-
16. Surface casing protects all known USDWs. . . . . . . . . Y N
17. CMT vol adequate to circulate on conductor & surf csg. . . ¥--N- N / Æ-
18. CMT vol adequate to tie-in long string to surf csg. . . . . . . Y N
19. CMT will cover all known productive horizons. . . . . . . . . . ~ N
20. Casing designs adequate for C, T, B & permafrost. . . . . . . '.- NN c;J'n--£v- .
21. Adequate tankage or reserve pit.. . . . . . . . . . . . . . . . L/ .L<, d'
22. If a re-drill, has a 10-403 for abandonment been approved. . . 'b NN- ¡: - {~( =v ~ .
23. Adequate wellbore separation proposed.. . . . . . . . . . . . a;¿
24. If diverter required, does it meet regulations. . ¡ . . . . . . . ~' ^'Ik
25, Drilling fluid program schematic & equip list adequate. . . . . 6iJ NN pZlcu¡, WlItJ -a l1 (J fCz .
26. BOPEs, do they meet regulation. . . . . . . . . . . . . . . . (¡) P
APPR DATE 27. BOPE press rating appropriate; test to '3'50 (J p sig. ~.N~ fVl S 2- '2.of '-f p C / .
i,/6k fL/q/02- 28. Choke manifold complies wlAPI RP-53 (May 84). . . . . . . .
lI-I 29. Work will occur without operation shutdown. . . . . . . . . . .
30. Is presence of H2S gas probable.. . . . . . . . . . . . . . . . ¡ý) N J 0 P p IA--\ I
31. Mechanical condition of wells within AOR verified. . . . . . . . Y N At/It:-
yG]
.ñ /U'/:;.
{
\
(Service Well Only)
GEOLOGY
APPR DATE
~ /2).,)7
(Exploratory Only)
32. Permit can be issued wlo hydrogen sulfide measures. . . . .
33. Data presented on potential overpressure zones. . . . . . . .
34. Seismic analysis of shallow gas zones. . . . . . . . . . . . .
35. Seabed condition survey (if off-shore). . .. . .. ......
36. Contact namelphone for weekly progress reports. ......
(
GEOLOGY: PETROLEUM ENGINEERING: RESERVOIR ENGINEERING UIC ENGINEER COMMISSIONER: Comments/Instructions:
RP&- TEM JDH JBR COT /~/h¿
DTS 12-/ / )
./ MJW MLB /loot. ~ '"
SFD WGA
Rev: 10/15/02 -
G:\geology\permits\checklist.doc
')
)
Well l-1istory File
APPENDIX
Information of detailed nature that is not
particularly germane to the Well Pennitting Process
but is part of the history file.
To improve the readability of the Well History file and to
simplify finding information. information of this
nature is accumulated at the end of the file under APPENDIX.
No special effort has been made to chronologically
organize this category of information.
)
)
I ()œ -5<3~
J8co )
Sperry-Sun Drilling Services
LIS Scan Utility
$Revision: 3 $
LisLib $Revision: 4 $
Wed May 14 10:44:41 2003
Reel Header
Service name............ .LISTPE
Date. . . . . . . . . . . . . . . . . . . . . 03/05/14
Or igin. . . . . . . . . . . . . . . . . . . STS
Reel Name............... . UNKNOWN
continuation Number..... .01
Previous Reel Name...... .UNKNOWN
Comments................ .STS LIS writing Library. Scientific Technical Services
Tape Header
Service name............ .LISTPE
Date. . . . . . . . . . . . . . . . . . . . .03/05/14
Or igin. . . . . . . . . . . . . . . . . . . STS
Tape Name............... . UNKNOWN
Continuation Number..... .01
Previous Tape Name...... . UNKNOWN
Comments................ .STS LIS Writing Library. Scientific Technical Services
Physical EOF
Comment Record
TAPE HEADER
Prudhoe Bay
MWD/MAD LOGS
#
WELL NAME:
API NUMBER:
OPERATOR:
LOGGING COMPANY:
TAPE CREATION DATE:
#
JOB DATA
W-19AL1pb1
500292200670
BP Exploration (Alaska), Inc.
Sperry Sun
14-MAY-03
JOB NUMBER:
LOGGING ENGINEER:
OPERATOR WITNESS:
MWD RUN 1
K-MW-2299019
S. LATZ
SEVCIK/SARBE
MWD RUN 3
K-MW-2299019
S. LATZ
SEVCIK/SARBE
MWD RUN 4
K-MW-2299019
S. LATZ
SEVCIK/SARBE
#
SURFACE LOCATION
SECTION:
TOWNSHIP:
RANGE:
FNL:
FSL:
FEL:
FWL:
ELEVATION (FT FROM
KELLY BUSHING:
DERRICK FLOOR:
GROUND LEVEL:
21
11N
12E
695
1181
MSL 0)
83.40
.00
47.83
~··~~iEECEi\l~:L1
#
WELL CASING RECORD
OPEN HOLE
CASING
DRILLERS
Jl' I!\J 0 1"') ".1'\('.7
)1 L DJVJ
h:2~¡(a J;¡ ~'Z~~n~~~~6t; (:0;;;m¡~ôion
f\'ß \) tf\~
)
)
BIT SIZE (IN) SIZE (IN) DEPTH (FT)
1ST STRING 3.750 4.500 10950.0
2ND STRING
3RD STRING
PRODUCTION STRING
#
REMARKS:
1. ALL DEPTHS ARE BIT DEPTHS UNLESS OTHERWISE NOTED. THESE DEPTHS ARE
MEASURED DEPTH (MD).
2. ALL VERTICAL DEPTHS ARE TRUE VERTICAL DEPTH - SUBSEA (TVDSS).
3. MWD RUN 1 WAS DIRECTIONAL WITH GAMMA MODULE (GM) UTILIZIING
GEIGER-MUELLER TUBE DETECTORS.
4. MWD RUN 2 DID NOT MAKE ANY FOOTAGE. NO DATA IS PRESENTED.
5. MWD RUN 3 WAS DIRECTIONAL WITH GM.
6. MWD RUN 4 WAS DIRECTIONAL WITH GM, AND ELECTROMAGNETIC WAVE
RESISTIVITY PHASE-4 (EWR4). A MAD PASS (UPHOLE) WAS PERFORMED
PRIOR TO DRILLING OUT FOR RUN 4. THESE DATA (EWR4) WERE DEPTH
CORRECTED TO THE DRILLED MWD RUN 3 DATA AND ARE INCLUDED WITH THE
RUN 3 DATA.
7. MWD DATA WAS DEPTH SHIFTED TO THE SCHLUMBERGER GAMMA RAY LOG OF
3/6/2003, PER THE 5/12/2003 E-MAIL FROM D. SCHNORR (BP EXPLORATION) .
HEADER AND RUN INFORMATION DATA RETAIN DRILLER'S DEPTH REFERENCES.
8. MWD RUNS 1 - 4 REPRESENT WELL W-19A L1 PB1 WITH API#: 50-029-22006-
70.
THIS WELL REACHED A TOTAL DEPTH (TD) OF 11925'MD / 8888'TVDSS.
SROP SMOOTHED RATE OF PENETRATION WHILE DRILLING.
SGRC SMOOTHED GAMMA RAY COMBINED.
SEXP SMOOTHED PHASE SHIFT-DERIVED RESISTIVITY (EXTRA SHALLOW SPACING) .
SESP SMOOTHED PHASE SHIFT-DERIVED RESISTIVITY (SHALLOW SPACING) .
SEMP SMOOTHED PHASE SHIFT-DERIVED RESISTIVITY (MEDIUM SPACING) .
SEDP SMOOTHED PHASE SHIFT-DERIVED RESISTIVITY (DEEP SPACING) .
SFXE SMOOTHED FORMATION EXPOSURE TIME.
$
File Header
Service name............ .STSLIB.001
Service Sub Level Name...
Version Number.......... .1.0.0
Date of Generation...... .03/05/14
Maximum Physical Record. .65535
File Type................ LO
Previous File Name...... .STSLIB.OOO
Comment Record
FILE HEADER
FILE NUMBER:
EDITED MERGED MWD
Depth shifted
DEPTH INCREMENT:
#
FILE SUMMARY
PBU TOOL CODE
FET
RPD
1
and clipped curves; all bit runs merged.
.5000
START DEPTH
10926.0
10926.0
STOP DEPTH
11896.0
11896.0
')
)
RPM
RPS
RPX
GR
ROP
$
10926.0
10926.0
10926.0
10931.5
10959.5
11896.0
11896.0
11896.0
11883.5
11927.5
#
BASELINE CURVE FOR SHIFTS:
CURVE SHIFT DATA (MEASURED DEPTH)
--------- EQUIVALENT UNSHIFTED DEPTH ------
BASELINE DEPTH GR
10632.0 10931.5
10933.5 10933.0
10937.0 10936.0
10939.0 10938.5
10954.0 10954.0
10960.5 10960.5
10969.0 10968.5
10975.5 10975.5
10980.0 10980.0
10987.5 10987.5
10991.5 10991.5
11015.0 11014.5
11017.5 11017.5
11020.0 11020.5
11021.5 11023.0
11024.0 11024.5
11034.0 11033.0
11038.5 11036.5
11046.5 11044.5
11061.5 11059.0
12679.5 12677.0
$
#
MERGED DATA SOURCE
PBU TOOL CODE BIT RUN NO MERGE TOP MERGE BASE
MWD 1 10931.0 11038.5
MWD 3 10925.5 11326.5
MWD 4 11282.5 11925.0
$
#
REMARKS: MERGED MAIN PASS.
$
#
Data Format Specification Record
Data Record Type..................O
Data Specification Block Type.....O
Logging Direction. . . . . . . . . . . . . . . . . Down
Optical log depth units.......... .Feet
Data Reference Point............. . Undefined
Frame Spacing.................... .60 .1IN
Max frames per record............ . Undefined
Absent value. . . . . . . . . . . . . . . . . . . . . . -999
Depth Uni t s . . . . . . . . . . . . . . . . . . . . . . .
Datum Specification Block sub-type...O
Name Service Order Units Size Nsam Rep Code Offset Channel
DEPT FT 4 1 68 0 1
ROP MWD FT/H 4 1 68 4 2
GR MWD API 4 1 68 8 3
RPX MWD OHMM 4 1 68 12 4
RPS MWD OHMM 4 1 68 16 5
) )
RPM MWD OHMM 4 1 68 20 6
RPD MWD OHMM 4 1 68 24 7
FET MWD HOUR 4 1 68 28 8
First Last
Name Service Unit Min Max Mean Nsam Reading Reading
DEPT FT 10926 11927.5 11426.8 2004 10926 11927.5
ROP MWD FT/H 0.07 851.26 60.4123 1937 10959.5 11927.5
GR MWD API 24.76 510.86 86.5946 1905 10931.5 11883.5
RPX MWD OHMM 0.31 2000 73.3826 1941 10926 11896
RPS MWD OHMM 0.1 2000 39.0729 1941 10926 11896
RPM MWD OHMM 0.11 2000 27.972 1941 10926 11896
RPD MWD OHMM 0.03 2000 46.4381 1941 10926 11896
FET MWD HOUR 0.27 58.37 9.84917 1941 10926 11896
First Reading For Entire File......... .10926
Last Reading For Entire File.......... .11927.5
File Trailer
Service name............ .STSLIB.001
Service Sub Level Name...
Version Number.......... .1.0.0
Date of Generation...... .03/05/14
Maximum Physical Record. .65535
File Type..... . . . . . . . . . . .LO
Next File Name.......... .STSLIB.002
Physical EOF
File Header
Service name............ .STSLIB.002
Service Sub Level Name...
Version Number.......... .1.0.0
Date of Generation...... .03/05/14
Maximum Physical Record. .65535
File Type................LO
Previous File Name...... .STSLIB.001
Comment Record
FILE HEADER
FILE NUMBER:
RAW MWD
Curves and log
BIT RUN NUMBER:
DEPTH INCREMENT:
#
FILE SUMMARY
VENDOR TOOL CODE
GR
ROP
$
2
header data for each bit run in separate files.
1
.5000
START DEPTH
10931.0
10959.5
STOP DEPTH
11012.0
11038.5
#
LOG HEADER DATA
DATE LOGGED:
SOFTWARE
SURFACE SOFTWARE VERSION:
26-FEB-03
Insite
)
DOWNHOLE SOFTWARE VERSION:
DATA TYPE (MEMORY OR REAL-TIME) :
TD DRILLER (FT):
TOP LOG INTERVAL (FT):
BOTTOM LOG INTERVAL (FT):
BIT ROTATING SPEED (RPM):
HOLE INCLINATION (DEG
MINIMUM ANGLE:
MAXIMUM ANGLE:
#
TOOL STRING (TOP TO BOTTOM)
VENDOR TOOL CODE TOOL TYPE
GM Dual GR
$
#
BOREHOLE AND CASING DATA
OPEN HOLE BIT SIZE (IN):
DRILLER'S CASING DEPTH (FT):
#
BOREHOLE CONDITIONS
MUD TYPE:
MUD DENSITY (LB/G):
MUD VISCOSITY (S):
MUD PH:
MUD CHLORIDES (PPM):
FLUID LOSS (C3):
RESISTIVITY (OHMM) AT TEMPERATURE (DEGF)
MUD AT MEASURED TEMPERATURE (MT):
MUD AT MAX CIRCULATING TERMPERATURE:
MUD FILTRATE AT MT:
MUD CAKE AT MT:
#
NEUTRON TOOL
MATRIX:
MATRIX DENSITY:
HOLE CORRECTION (IN):
#
TOOL STANDOFF (IN):
EWR FREQUENCY (HZ):
#
REMARKS:
$
#
Data Format Specification Record
Data Record Type..................O
Data Specification Block Type.....O
Logging Direction................ . Down
Optical log depth units.......... .Feet
Data Reference Point............. .Undefined
Frame Spacing.................... .60 .1IN
Max frames per record............ .Undefined
Absent value. . . . . . . . . . . . . . . . . . . . . . -999
Depth Units. . . . . . . . . . . . . . . . . . . . . . .
Datum Specification Block sub-type...O
4.3
Memory
11039.0
10930.0
11039.0
41.1
49.5
TOOL NUMBER
82758
3.750
10950.0
Flo Pro
8.80
65.0
9.0
23000
8.0
.000
.000
.000
.000
.0
155.0
.0
.0
Name Service Order
DEPT
ROP MWD010
GR MWD010
Units Size Nsam Rep Code Offset Channel
FT 4 1 68 0 1
FT/H 4 1 68 4 2
API 4 1 68 8 3
) )
First Last
Name Service Unit Min Max Mean Nsam Reading Reading
DEPT FT 10931 11038.5 10984.8 216 10931 11038.5
ROP MWDOI0 FT/H 0.99 66.75 23.212 159 10959.5 11038.5
GR MWDOI0 API 50.07 282.93 101.263 163 10931 11012
First Reading For Entire File......... .10931
Last Reading For Entire File......... ..11038.5
File Trailer
Service name............ .STSLIB.002
service Sub Level Name...
Version Number.......... .1.0.0
Date of Generation...... .03/05/14
Maximum Physical Record. .65535
File Type............... .LO
Next File Name.......... .STSLIB.003
Physical EOF
File Header
Service name............ .STSLIB.003
Service Sub Level Name...
Version Number.......... .1.0.0
Date of Generation...... .03/05/14
Maximum Physical Record. .65535
F i 1 e Type...... . . . . . . . . . . LO
Previous File Name...... .STSLIB.002
Comment Record
FILE HEADER
FILE NUMBER:
RAW MWD
Curves and log
BIT RUN NUMBER:
DEPTH INCREMENT:
#
FILE SUMMARY
VENDOR TOOL CODE
FET
RPD
RPM
RPX
RPS
GR
ROP
$
3
header data for each bit run in separate files.
3
.5000
START DEPTH
10925.5
10925.5
10925.5
10925.5
10925.5
11011.0
11039.0
STOP DEPTH
11299.5
11299.5
11299.5
11299.5
11299.5
11299.5
11326.5
#
LOG HEADER DATA
DATE LOGGED:
SOFTWARE
SURFACE SOFTWARE VERSION:
DOWNHOLE SOFTWARE VERSION:
DATA TYPE (MEMORY OR REAL-TIME) :
TD DRILLER (FT):
TOP LOG INTERVAL (FT):
BOTTOM LOG INTERVAL (FT):
BIT ROTATING SPEED (RPM):
27-FEB-03
Insite
4.3
Memory
11326.0
11039.0
11326.0
)
HOLE INCLINATION (DEG
MINIMUM ANGLE:
MAXIMUM ANGLE:
#
TOOL STRING (TOP TO
VENDOR TOOL CODE
GM
EWR4
$
BOTTOM)
TOOL TYPE
Dual GR
ELECTROMAG. RESIS. 4
#
BOREHOLE AND CASING DATA
OPEN HOLE BIT SIZE (IN):
DRILLER'S CASING DEPTH (FT):
#
BOREHOLE CONDITIONS
MUD TYPE:
MUD DENSITY (LB/G):
MUD VISCOSITY (S):
MUD PH:
MUD CHLORIDES (PPM):
FLUID LOSS (C3):
RESISTIVITY (OHMM) AT TEMPERATURE (DEGF)
MUD AT MEASURED TEMPERATURE (MT):
MUD AT MAX CIRCULATING TERMPERATURE:
MUD FILTRATE AT MT:
MUD CAKE AT MT:
#
NEUTRON TOOL
MATRIX:
MATRIX DENSITY:
HOLE CORRECTION (IN):
#
TOOL STANDOFF (IN):
EWR FREQUENCY (HZ):
#
REMARKS:
$
#
Data Format Specification Record
Data Record Type..................O
Data Specification Block Type.....O
Logging Direction. . . . . . . . . . . . . . . . . Down
Optical log depth units.......... .Feet
Data Reference Point............. . Undefined
Frame Spacing.................... .60 .1IN
Max frames per record............ .Undefined
Absent value...................... -999
Depth Units. . . . . . . . . . . . . . . . . . . . . . .
Datum Specification Block sub-type...O
)
53.7
89.5
TOOL NUMBER
78012
125631
3.750
10950.0
Flo Pro
8.80
65.0
8.5
24000
6.8
.000
.000
.000
.000
.0
166.0
.0
.0
Name Service Order Units Size Nsam Rep Code Offset Channel
DEPT FT 4 1 68 0 1
ROP MWD030 FT/H 4 1 68 4 2
GR MWD030 API 4 1 68 8 3
RPX MWD030 OHMM 4 1 68 12 4
RPS MWD030 OHMM 4 1 68 16 5
RPM MWD030 OHMM 4 1 68 20 6
RPD MWD030 OHMM 4 1 68 24 7
FET MWD030 HOUR 4 1 68 28 8
) ')
First Last
Name Service Unit Min Max Mean Nsam Reading Reading
DEPT FT 10925.5 11326.5 11126 803 10925.5 11326.5
ROP MWD030 FT/H 0.07 70.34 37.4293 576 11039 11326.5
GR MWD030 API 34.78 510.86 138.57 578 11011 11299.5
RPX MWD030 OHMM 0.31 2000 146.468 749 10925.5 11299.5
RPS MWD030 OHMM 0.1 2000 83.6203 749 10925.5 11299.5
RPM MWD030 OHMM 0.11 2000 57.4159 749 10925.5 11299.5
RPD MWD030 OHMM 0.03 2000 98.3842 749 10925.5 11299.5
FET MWD030 HOUR 7.52 58.37 22.8232 749 10925.5 11299.5
First Reading For Entire File......... .10925.5
Last Reading For Entire File.......... .11326.5
File Trailer
Service name............ .STSLIB.003
Service Sub Level Name...
Version Number.......... .1.0.0
Date of Generation...... .03/05/14
Maximum Physical Record. .65535
File Type................LO
Next File Name.......... .STSLIB.004
Physical EOF
File Header
Service name............ .STSLIB.004
Service Sub Level Name...
Version Number.......... .1.0.0
Date of Generation...... .03/05/14
Maximum Physical Record. .65535
File Type................ LO
Previous File Name...... .STSLIB.003
Comment Record
FILE HEADER
FILE NUMBER:
RAW MWD
Curves and log
BIT RUN NUMBER:
DEPTH INCREMENT:
#
FILE SUMMARY
VENDOR TOOL CODE
GR
RPD
RPM
RPS
RPX
FET
ROP
$
4
header data for each bit run in separate files.
4
.5000
START DEPTH
11282.5
11297.5
11297.5
11297.5
11297.5
11297.5
11327.0
STOP DEPTH
11881.0
11893.5
11893.5
11893.5
11893.5
11893.5
11925.0
#
LOG HEADER DATA
DATE LOGGED:
SOFTWARE
SURFACE SOFTWARE VERSION:
DOWNHOLE SOFTWARE VERSION:
28-FEB-03
Insite
4.3
· .
')
DATA TYPE (MEMORY OR REAL-TIME) :
TD DRILLER (FT):
TOP LOG INTERVAL (FT):
BOTTOM LOG INTERVAL (FT):
BIT ROTATING SPEED (RPM):
HOLE INCLINATION (DEG
MINIMUM ANGLE:
MAXIMUM ANGLE:
#
TOOL STRING (TOP TO
VENDOR TOOL CODE
8M
EWR4
$
BOTTOM)
TOOL TYPE
Dual GR
ELECTROMAG. RES IS. 4
#
BOREHOLE AND CASING DATA
OPEN HOLE BIT SIZE (IN):
DRILLER'S CASING DEPTH (FT):
#
BOREHOLE CONDITIONS
MUD TYPE:
MUD DENSITY (LB/G):
MUD VISCOSITY (S):
MUD PH:
MUD CHLORIDES (PPM):
FLUID LOSS (C3):
RESISTIVITY (OHMM) AT TEMPERATURE (DEGF)
MUD AT MEASURED TEMPERATURE (MT):
MUD AT MAX CIRCULATING TERMPERATURE:
MUD FILTRATE AT MT:
MUD CAKE AT MT:
#
NEUTRON TOOL
MATRIX:
MATRIX DENSITY:
HOLE CORRECTION (IN):
#
TOOL STANDOFF (IN):
EWR FREQUENCY (HZ):
#
REMARKS:
$
#
Data Format Specification Record
Data Record Type................ ..0
Data Specification Block Type.....O
Logging Direction............... ..Down
Optical log depth units.......... .Feet
Data Reference Point............. . Undefined
Frame Spacing................... ..60 .1IN
Max frames per record............ .Undefined
Absent value...................... -999
Depth Units. . . . . . . . . . . . . . . . . . . . . . .
Datum Specification Block sub-type...O
)
Memory
11925.0
11326.0
11925.0
80.5
88.7
TOOL NUMBER
78012
125631
3.750
10950.0
Flo Pro
8.80
55.0
8.5
26000
5.2
.090
.040
.140
.170
68.0
176.0
68.0
68.0
Name Service Order Units Size Nsam Rep Code Offset Channel
DEPT FT 4 1 68 0 1
ROP MWD040 FT/H 4 1 68 4 2
GR MWD040 API 4 1 68 8 3
RPX MWD040 OHMM 4 1 68 12 4
RPS MWD040 OHMM 4 1 68 16 5
RPM MWD040 OHMM 4 1 68 20 6
) )
RPD MWD040 OHMM 4 1 68 24 7
FET MWD040 HOUR 4 1 68 28 8
First Last
Name Service Unit Min Max Mean Nsam Reading Reading
DEPT FT 11282.5 11925 11603.8 1286 11282.5 11925
ROP MWD040 FT/H 0.64 851.26 76.6577 1197 11327 11925
GR MWD040 API 24.76 314.77 57.9525 1198 11282.5 11881
RPX MWD040 OHMM 1.53 2000 27.6161 1193 11297.5 11893.5
RPS MWD040 OHMM 1.18 1935.5 12.8336 1193 11297.5 11893.5
RPM MWD040 OHMM 1.18 1395.46 9.56308 1193 11297.5 11893.5
RPD MWD040 OHMM 0.69 1875.72 15.5046 1193 11297.5 11893.5
FET MWD040 HOUR 0.27 9.37 1.62983 1193 11297.5 11893.5
First Reading For Entire File......... .11282.5
Last Reading For Entire File.......... .11925
File Trailer
Service name............ .STSLIB.004
Service Sub Level Name...
Version Number.......... .1.0.0
Date of Generation...... .03/05/14
Maximum Physical Record. .65535
F i 1 e Typ e. . . . . . . . . . . . . . . . LO
Next File Name.......... .STSLIB.005
Physical EOF
Tape Trailer
Service name............ .LISTPE
Date. . . . . . . . . . . . . . . . . . . . .03/05/14
Origin. . . . . . . . . . . . . . . . . . . STS
Tape Name............... . UNKNOWN
Continuation Number..... .01
Next Tape Name.......... .UNKNOWN
Comments................ .STS LIS writing Library. Scientific Technical Services
Reel Trailer
Service name............ .LISTPE
Date. . . . . . . . . . . . . . . . . . . . .03/05/14
Origin. . . . . . . . . . . . . . . . . . . STS
Reel Name............... . UNKNOWN
Continuation Number..... .01
Next Reel Name.......... . UNKNOWN
Comments................ .STS LIS Writing Library. Scientific Technical Services
Physical EOF
Physical EOF
)
)
End Of LIS File
c( 'V
)
)
C) oC) -<9.:35
, \ ci'1o
Sperry-Sun Drilling Services
LIS Scan Utility
$Revision: 3 $
LisLìb $Revìsìon: 4 $
Wed May 14 13:19:27 2003
Reel Header
Service name.............LISTPE
Oat e . . . . . . . . . . . . . . . . . . . . . 03/05/14
Origin.................. .STS
Reel Name................UNKNOWN
Continuation Number...... 01
Previous Reel Name.......UNKNOWN
Comments.................STS LIS Writing Library. Scientific Technical Services
Tape Header
Service name.............LISTPE
Date. . . . . . . . . . . . . . . . . . . . . 03/ 05/ 1 4
Origin. . . . . . . . . . . . . . . . . . . STS
Tape Name................ UNKNOWN
Continuation Number......01
Previous Tape Na,mc....... UNKNOWN
Comments. . . . . . . . . . . . . . . . . S1'S LIS Wri t:ing Library. Scienti fic Technical Services
Physical Eor
Cowmen L Reco.rd
TAPE HEADER
Prudhoe Bay
MWD/MAD LOGS
#
WELL NAME:
API NUMBER:
OPERATOR:
LOGGING COMPANY:
TAPE CREATION DATE:
#
,JOB DATA
W-19A L1 PB2
500292200671
BP Exploration (Alaska), Inc.
Sper,ry Sun
14-MAY-03
JOB NUMBCR:
LOGGING ENGINEER:
OPERATOR WITNESS:
MWD RUN 1
K-MW-2299019
S. LATZ
SEVCIK/SARBE
MWD RUN 3
K-MW-2299019
S. LATZ
SEVCIK/SAEBE
MWD RUN 4
{-MW-2299019
S. LATZ
SEVCIK/SARBE
cTOB NUMBER:
LOGGING ENGINEER:
OPERATOR WITNESS:
MWD RUN 5
K-MW-2299019
S. LATZ
SEVCIK/SARBE
MWD RUN 6
K-MW-2299019
S. LATZ
SEVCIK/SARBE
#
SURFACE LOCATION
SECTION:
TOWNSl-II P:
RANGE:
fN I. :
FSL:
FEL:
!?WI.:
ELEVATION (FT FROM
KELLY BUSHING:
DERRICK fLOOR:
GROUND LEVEL:
21
11N
12E
695
1181
MSL 0)
83.40
.00
47.83
~
WELL CASING RECORD
1ST STRING
?ND S'l'k l N(~
3RD STRING
PRODUCTION STRING
Ot'l::N HOLl::
BIT SIZE (IN)
3.750
CASiNG
SIZE (IN)
4.500
LJkiLLl::RS
DEPTH (FT)
10950.0
~"~~=(~F='\ll~D
REHARKS:
111'·1 C I") r:(\iÎ-;~
IJUi\1 L L'v'\,.Jv
}~ja~:Jc~~
t::,
C;Gn¿~ .(;ü;;1m¡~;~tOn
~~~~I\~
ß\nchar~tg(:~
)
')
1. ALL DEPTHS ARE BIT DEPTHS UNLESS OTHERWISE NOTED. THESE DEPTHS ARE
MEASURED DEPTH (MD).
2. ALL VERTICAL DEPTHS ARE TRUE VERTICAL DEPTH - SUBSEA (TVDSS).
3. MWD RUN 1 WAS DIRECTIONAL WITH GAMMA MODULE (GM) UTILIZIING
GEIGER-MUELLER TUBE DETECTORS.
1. MWD RUN 2 DID NOT MAKE ANY FOOTAGE. NO Dl\TA IS PRESENTED.
5. MWD RUN 3 WAS DIRECTIONAL WITH GM.
6. MWD RUNS 4-5 WERE DIRECTIONAL WITH GM, AND ELECTROMAGNETIC WAVE
RESISTIVITY PHASE-4 (EWR4). A MAD PASS (UPHOLE) WAS PERFORMED
PRIOR TO DRILLING OUT FOR RUN 4. THESE DATA (EWR4) WERE DEPTH
CORRECTED TO THE DRILLED MWD RUN 3 DATA AND ARE INCLUDED WITH THE
RUN 3 DATA.
7. MWD RUN 6 WAS DIRECTIONAL WITH GM.
8. MWD DATA WAS DEPTH SHIFTED TO THE SCHLUMBERGER GAMMA RAY LOG OF
3/6/2003, PER THE 5/12/2003 E-MAIL FROM D. SCHNORR (BF EXPLORATION).
HEADER AND RUN INFORMATION DATA RETAIN DRILLER'S DEPTH REFERENCES.
9. MWD RUNS 1 - 6 REPRESENT WELL W-19A Ll PB2 WITH API#:
50-029-22006-72. THIS WELL REl\CI-1ED ]\ TOTAL DEP'rH (TD)
OF 12701'MD / 8861'TVDSS.
SROP =
SGRC
SEXP
SESP
SF:MP
SEDP
SFXE -
$
SMOOTHED RATE OF PENETRATION WHILE DRILLING.
SMOOTHED GAMMA RAY COMBINED.
SMOOTHED PHASE SHIFT-DERIVED RESISTIVITY (EXTRA SHALLOW SPACING).
SMOOTHED PHASE SHIF'I'-DERIVED RESISTIVITY (SHALLOW SPACING).
SMOOTHE,J) PHASr~ SHIF"I'-DE'..HrVED ,R,!",SIS'I'JVI'J'Y (MEDIUM SPACING).
SMOOTHED PHASE SHIFT-DERIVED RESISTIVITY (DEEP SPACING).
SMOOTHED FORMATION EXPOSURE TIME.
File Header
Service name.............STSLIB.OOl
Service Sub Level, Name...
Version Number...........l.0.0
Date of Generation.......03/05/14
Maximum Physical Record. .65535
Fil e Type................ LO
Previous File Name.......STSLIB.OOO
Comment Record
FILE HEADER
FILE NUMBER:
EDITED MERGED MWD
Depth shìíted
DEPTH INCREMENT:
ff
FILE SUMMARY
PBU TOOL CODE
FET
RPD
RPM
RPS
RPX
GR
ROP
$
1
and clipped curves; all bit runs merged.
.5000
START DEPTH
10926.0
10926.0
10926.0
10926.0
10926.0
10931.5
10959.5
STOP DEPTH
12487.0
12487.0
12487.0
12187.0
12487.0
12676.5
12703.5
ff
BASELINE CURVE FOR SHIFTS:
CURVE SHIFT DATA (MEASURED DEPTH)
--------- EQUIVALENT UNSHIFTED DEPTH ---------
B.A.SELINE DEPTH
10632.0
10933.5
10937.0
10939.0
10954.0
10960.5
10969.0
GR
10931.5
10933.0
10936.0
10938.5
10954.0
10960.5
10968.5
)
)
10975.5
10980.0
10987.5
10991. 5
11015.0
11017.5
11020.0
11021.5
11024.0
11034.0
11038..5
11046.5
11061.5
12679.5
$
10975.5
10980.0
10987.5
10991. 5
11014. b
11017 . 5
11020.5
11023.0
11024.5
11033.0
11036.5
11044.5
11059.0
12677.0
it
MERGED DATA SOURCE
PBU TOOL CODE
MWO
MWD
MWD
MWD
MWD
$
BIT RUN NO MERGE TOP
1 10931.0
3 10925.5
4 11282.5
5 1,1517.0
6 12464.0
MERGE BASE
11038.5
11326.5
11563.0
12.516.0
12701.0
#
REMARKS:
MERGED MAIN PASS.
$
11
Data Format Specification Record
Dat,a Record Type.................. 0
Data Sped, ficati.,on 8l,ock Type..... 0
Logging Direction.................Down
Optical log depth units...........Feet
Data Reference Point..............Undefined
Frame Spacing.. ............. ......60 .1IN
Max frames per record.............Undefined
Absent véllue..................... .-999
Depth Units.......................
Datum Specification Block sub-type...O
Name Service Order Units Size Nsam Rep Code Offset Channel
DEPT FT 4 1 68 0 1
ROP. MWD FT/H 4 1 68 4 2
GR MWD API 4 1 68 8 3
RPX MWD OHMM 4 1 68 12 4
RPS HWD OHHH 4 1 68 16 5
RPM MWD OHMM 4 1 68 20 6
RPD MWD OHMM 4 1 68 24 7
FET MWD HOUR 4 1 68 28 8
First Last
Name Service Unit Min Max Mean Nsam Reading Reading
DEFT FT 10926 12703.5 11814.8 3556 10926 12703.5
ROP MWD FT/H 0.07 851.26 76.9176 3189 10959.5 12703.:',
GR MWD API 19.49 510.86 '12.42'/2 3491 10931. .5 12676.b
RPX MWD o H¡V¡¡V¡ 0.31 2000 43.2644 3123 10926 12487
RPS MWD OHMM 0.1 2000 27.1158 3123 10926 12187
RPM MWD OHMM 0.11 2000 19.9408 3123 10926 12487
RI?D MWD OHMM 0.03 2000 32.1166 3123 10926 12487
fST Mì^JD !lOUR 0.26 58.37 6.38894 3123 10926 1248:
First Reading For Entire File..........10926
Last Reading For Entire File... ........12703.5
File Trailer
Service namc.............STSLIB.001
Service Sub Level Name...
Ver::;iof¡ NuntDer.......... .1.0.0
Date of Generation.......03/05/11
Maximum Physical Record..6bb3b
File Type................LO
')
Next File Name...........STSLIB.002
Physical EOF
File Header
Service name.............STSLIB.002
Ser'vice Sub Level Name...
Version Number...........l.O.O
Date of Generation.......03/05/14
Maximum Physical Record..65535
File Tjlpe.. _ _ . . . . _ . . . _ . . . LO
Previous File Name.......STSLIB.OOl
Comment Record
FI LE HEADER
FILE NUMBER:
RAW MWD
Cu,eves and 10o;J
BIT RUN NUMBER:
DEPTH INCREMENT:
fi
FILE SUMMARY
VENDOR TOOL CODE
2
header data for each bit Lun itl separate files.
1
.5000
START DEPTH
10931. 0
10959.5
STOP DEPTH
11012.0
11038.5
GR
ROP
$
#
LOG HEADER DATA
DATE LOGGED:
SOFTWARE
SURFACE SOFTWARE VERSION:
DOWNHOLE SOFTWARE VERSION:
DATA TYPE (MEMORY OR REAL-TIME) :
'I'D DRILLER (FT):
TOP LOG INTERVAL (FT):
BOTTOM LOG INTERVAL (FT):
BIT ROTATING SPEED (RPM):
HOLE INCLINATION (DEG
MINIMUM ANGLE:
MAXIMUM ANGLE:
#
TOOL STRING (TOP TO BOTTOM)
VENDOR TOOL CODE TOOL TYPE
GM Dual GR
$
BOREHOLE AND CASING DATA
OPEN HOLE BIT SIZE (IN):
DRILLER'S CASING DEPTH (FT):
#
BOREHOLE CONDITIONS
HUD TYPE:
MUD DENSITY (LB/G):
MUD VISCOSITY (3):
HUD PH:
MUD CHLORIDES (PPM):
FLUID LOS3 (C3):
RESISTIVITY (OH~M) AT TEHPERATURE (DEGF)
t-1UD AT MCASURCD TCt-1PERATURC (MT):
MUD .IJ"T MA.X CIRCULATING TERMI?ERATURC:
HUD FILTRATE AT HT:
NUD CAKC AT MT:
NEUTRON TOOL
t·tIJ"TRIX:
MJI..TRIX DENSITY:
HOLE CORRECTION (IN):
TOOL STANDOE'F (IN):
EWR FREQUENCY (HZ):
#
REI"iARKS:
$
26-FEB-03
Insite
4.3
Memory
11039.0
10930.0
11039.0
41.1
49.5
TOOL NUMBER
82758
3.750
10950.0
FIa P L'O
8.80
61J.0
9.0
23000
8.0
.000
.000
.000
.000
. (I
155.0
.l:1
.0
')
')
)
it
Data Format Specification Record
Data Record Type..................O
Data Specification Block Type.....O
Logging Direction.................Down
Optical log depth units...........Feet
Data Reference Point..............Undefined
Frame Spacing.....................60 .1IN
Max fL-ames peL- r-ecord............ .Undefined
Absent value...................... -999
Depth !Jni ts . . . . . . . . . . . . . . . . . . . . . . .
Datum Specification Block sub-type...O
Nume Service Order Units Size Nsam Rep Code Offset Channel
DEPT FT 4 1 68 0 1
ROP MWD010 FT/H <1 .1 68 <1 ';'
GR MWD010 API 4 1 68 8 3
First Lust
Name Service Unit Min Max Mean Nsam Reading Reading
DEPT FT 10931 11038.5 10984.8 216 10931 11038.5
ROP MWD010 FT/H 0.99 66.75 23.212 159 10959.5 11038.5
GR MWD010 A.PI 50.01 282.93 101.263 163 10931 11012
First Reading For Entire File..........l0931
Last Reading For Entire File...........11038.5
File TL"aileL-
Service name............ .S'1'SLI8.002
Service Sub Level Name...
Version Number........... L 0.0
Date of Generution.......03/05/14
Maximum Physical Record..65535
Fil e Type................ LO
Next File Name...........STSLIB.003
Physicul EOF
File Header
Service name.............STSLIB.003
Service Sub Level Name...
Version Number.......... .1.0.0
Date of Generation.......03/05/14
Maximum Physical Record..65535
F i 1 e '1' ype. . . . . . . . . . . . . . . . LO
Previous File Name.......STSLIB.002
Continent RecoL-d
FILE HEADER
FILE NUMBER:
RAW MWD
Curves ;]nd log
81'1' RUN NUMBER:
DEPTH INCREMENT:
#
FILE SUrvlMARY
VENDOR TOOL CODE
FET
RP¡"1
RPS
RPX
RPD
GR
ROP
3
header data for each bit run in separate files.
3
.5000
START DEPTH
10925.5
10925.5
10925.5
10925.5
10925.5
11011.0
11039.0
STO!? DE!?TH
11¿99.~
11299.5
11299.5
11299.5
11299.5
11299.5
11326.5
:;
if
Lor; HEADER DATA
DATE LOGGED:
SOFTí-JJ\RE
27 - FEB-03
')
SURFACE SOFTWARE VERSION:
DOWNHOLE SOFTWARE VERSION:
DATA TYPE (MEMORY OR REAL-TIME):
TO DRILLER (FT):
TOP LOG INTERVAL (FT):
BOTTOM LOG INTERVAL (FT):
BIT ROTATING SPEED (RPM):
HOLE INCLINATION (DEG
MINIMUM ANGLE:
MAXIMUM ANGLE:
#
TOOL STRING (TOP TO
VENDOR TOOL COOS
GM
EWR4
Q
"
BOTTOM)
TOOL TYPE
Dual GR
ELECTROMAG. RESIS. 4
#
BOREHOLE AND CASING DATA
OPEN HOLE BIT SIZE (IN):
DRILLER'S CASING DEPTH (FT):
BORE.HOL,E, CONDI,'I'I,()NS
MUD TYPE:
MUD DENSITY (LB/G):
MUD VISCOSITY (S):
MUD PH:
MUD CHLORIDES (PPM):
FLUID LOSS (C3):
RESISTIVITY (OHMM) AT TEMPERATURE (DEGF)
MUD AT MEASURED TEMPERATURE (MT):
MUD AT MAX CIRCULATING 'l'ER,MPERA,TlJRE:
MUD FILTRATE AT MT:
MUD CAKE AT MT:
#
NEUTRON TOOL
MATRIX:
MATRIX DENSITY:
HOLE CORRECTION (IN):
#
TOOL STANDOFF (IN):
EWR FREQUENCY (HZ):
#
REMARKS:
$
#
Data Format Specification Record
Data Record Type.................. 0
DatA Specification B10ck Type..... 0
Logging Direction.................Down
Optical log depth units...........Feet
Data Reference Point..............Undefjned
Frame Spacing.....................60 .1IN
Max frames per record.............Undefined
Absent value...................... -999
Depth Uni t8. . . . . . . . . . . . . . . . . . . . . . .
Datum Specification Block sub-type...O
)
In8ite
4.3
Mernor'Y
11326.0
11039.0
11326.0
53.7
89.5
TOOL NUMBER
78012
125631
3.750
10950.0
F10 Pro
8.80
65.0
8.5
24000
6.8
.000
.000
.000
.000
.0
166.0
.0
.0
Name Service Order Unit:::; Size N:::;am Rep Code Off:::;et Channel
DEPT FT 4 1 68 0 1
ROF HWD030 FT/H 4 1 G8 4 2
GR MWD030 API 4 1 68 8 3
RPX MWD030 OHMM 4 1 68 12 4
RPS MWD030 OHMM 4 1 68 16 5
RPM MWD030 OHMM -1 1 68 20 6
RPD MWD030 OHMM 4 1 68 24 7
FET ¡V¡WD030 HOUR 4 1 68 28 8
first Last
Name Service Unit Min Max Mean Nsam Reading Read ng
DE!?T FT 10925.5 1132G.5 11126 803 10925.5 113 6.5
ROP M~^JDO 3 0 fT/H 0.07 70.34 37.4293 576 11039 113 6.5
GR MWDU3U API 34. 'I'd SlO.86 13:':\. :J/ 5/8 11011 112 9.S
RPZ HWD030 o HìvJlv¡ 0.31 2000 1<16.468 749 10925.5 112 9.5
)
)
RPS MWD030 OHMM 0.1 2000 83.6203 749 10925.5 11299.5
RPM MWD030 OHMM 0.11 2000 5'1.4159 '149 10925.5 11299.5
RPD MWDOJO OHMM 0.03 2000 98.3842 749 10925.5 11299.:>
FET MWD030 HOUR 7.52 58.37 22.8232 749 10925.5 11299.5
First Reading For Entire File..........l0925.5
Last Reading For Entire File...........l1326.5
File Trailer
Service name.............STSLIB.003
Service Sub Level Name...
Version Number...........l.0.0
Date of Generation.......03/05/14
Maximum Physical Record..65535
Fi 1 e Type................ LO
Next File Name...........STSLIB.004
Physical EOF
File Header
Service name.............STSLIB.004
Service Sub Level Name...
Version Number.......... .1.0.0
Date of Gcneration.......03/05/14
Maximum Physical Record..65535
File Type................LO
Previous File Name.......STSLIB.003
Comrnent RecoL'd
FI LE HEADER
FI LE NUMBER:
RAW MWD
Curves and log
BIT RUN NUMBER:
DEPTH INCREMENT:
II
FILE SUMMARY
VENDOR TOOL CODE
GR
E'ET
RPD
RPM
RPS
RPX
ROP
$
4
header data for each bit run in separate files.
4
.5000
START DEPTH
11282.5
11297.5
11297.5
11297.5
11297.5
11297.5
11327.0
ff
LOG HEADER DATA
DATE LOGGED:
SOFTWARE
SURFACE SOFTWARE VERSION:
DOWNHOLE SOFTWARE VERSION:
DATA TYPE (MEMORY OR REAL-TIME):
TO DRILLER (FT):
TOP LOG INTERVAL (FT):
BOTTOM LOG INTERVAL (FT):
BIT ROTATING SPEED (RPM):
HOLE INCLINATION (DEG
MINIMUM ANGLE:
HAXIMUH ANGLE:
if
TOOL STRING (TOP TO
VENDOR TOOL CODE
GM
EWR4
$
STOP DEPTH
11562.0
11563.0
11563.0
11563.0
11563.0
11563.0
11563.0
BOTTOM)
TOOL TYPE
Du:tl GR
ELECTROMAG. RES IS. 4
ff
BOREHOLE AND CASING DATA
OPEN HOLE BIT SIZE (IN):
DRILLER'S CASING DEPTH (FT):
28-FEB-03
Iosite
4.3
Memory
11562.0
11326.0
11562. (J
eO.5
88.7
TOOL NUHBER
82758
125631
3.750
1095U.1)
)
)
BOREHOLE CONDITIONS
MUD TYPE:
MUD DENSITY (LB/G):
MUD VISCOSITY (S):
MUD PH:
MUD CHLORIDES (PPM):
FLUID LOSS (C3):
RESIS'I'lVTI'Y (OHMM) AT TEMPERATURE (DJ::Gb')
MUD AT MEASURED TEMPERATURE (MT):
MUD AT MAi'{ CIRCULATING TERM PERATURE :
MUD FILTRATE ,AT MT:
MUD CAKE AT MT:
Flo Pro
8.80
55.0
8.5
26000
5.2
.090
.040
.140
.170
68.0
176.0
68.0
68.0
#
NEUTRON TOOL
MATRIX:
MATRIX DENSITY:
HOLE CORRECTION (IN):
TOOL STANDOFF (IN):
EWR FREQUENCY (HZ):
il
REMARKS:
$
ff
Data Format Specification Record
Data Record Type..................O
Data Specification Block Type.....O
Logging Direction.................Down
Optical log depth units...........Feet
Data Reference Point..............Undefined
Frame Spacing.....................60 .1IN
Max frames per record.............Undefined
Absent value..................... .-999
Depth Un its. . . . . . . . . . . . . . . . . . . . . . .
Datum Specification Block sub-type...O
Name Service Order Units Size Nsam Rep Code Offset Channel
DEPT FT 4 1 68 0 1
ROP Mí"lD040 fT/ll 4 1 68 1\ ,.,
GR MWD040 API 4 ]. 68 8 3
RPX MWD040 OHMM 4 1 68 12 4
RPS MWD010 OHMM <1 1 68 16 5
RPfvl MWD040 OHMM 4 1 68 20 6
RPD MWD040 OHMM 4 1 68 24 7
fET MWD040 HOUR 4 1 68 28 8
First Last
Name Service Unit Min Max Mean Nsam Reading Reading
DEPT FT 11282.5 11563 11422.8 562 11282.5 11563
ROP MWD010 FT/H 3.88 851.26 77.7821 173 11327 11563
GR MWD040 API 24.76 143.1 50.895 560 11282.5 11562
RPX MWD040 OHMM 2.83 14.28 7.55955 532 11297.5 11563
RPS MWD010 OHMM 2.79 16.3 7.95318 532 11297.5 11563
RPM MWD040 OHMM 2.85 17 .1 8.02436 532 11297.5 11563
RPD MWD040 OHMM 3.32 14.38 7.44784 532 11297.5 11563
fET M~^JDO 40 HOUR 0.44 9.37 1.93036 532 11297.5 11563
tirst Reùding tor Entire tilc..........11282.5
Last Reading For Entire File...........11563
file Trailer
Servicc nùmc.............STSLIB.001
Service Sub Level Name...
Ver:::lür¡ NuwbeL.......... .1.0.0
D2te of Gener2tion.......03/05/11
Maximum Physical Record..6~~3~
tlle Type................LO
Next File Nùmc...........STSLIB.005
')
Physical EOP
Pile Header'
Service name.............STSLIB.005
Service Sub Level Name...
Version Number...........l.0.0
Date of Generation.....,.03/05/14
Maximum Physical Record..65535
Pile Type............... .1..0
Previous File Name.......STSLIB.004
Comment Record
FILE HEADER
FILE NUMBER:
RAW MWD
Curves and log
BIT RUN NUMBER:
DEPTH INCREMENT:
#
E'ILE SUMMARY
VENDOR TOOL CODE
GR
RPX
RPS
RPM
RPD
FCT
ROP
$
5
)
header data for each bit run in separate files.
5
.5000
START DEPTH
11~)1'1 . 0
11531.5
11~)31. 5
11531. 5
11531. 5
11531. 5
11563.,5
ff
LOG HEADER DATA
DATE LOGGED:
SOFTWARE
SURFACE SOFTWARE VERSION:
DOWNHOLE SOFTWARE VERSION:
DATA TYPE (MEMORY OR REAL-TIME):
TO DRILLER (FT):
TOP LOG INTERVAL (FT):
BOTTOM LOG INTERVAL (FT):
BIT ROTATING SPEED (RPM):
HOLE INCLINI\TION (DEG
MINIMUM ANGLE:
MAXIMUM ANGLE:
STOP DEPTH
12471. !)
12484.5
12481. 5
12484.5
12484.5
12484.5
12516.0
TOOL STRING (TOP TO
VENDOR TOOL CODE
GM
EWR4
$
BOTTOM)
TOOL TYPE
Dual GR
ELECTROMAG. RESIS. 4
ff
BOREHOLE AND CASING DATA
OPEN HOLE BIT SIZE (IN):
DRILLER'S CASING DEPTH (FT):
#
BOREHOLE CONDITIONS
MUD TYPE:
MUD DENSITY (LB/G):
MUD VISCOSITY (S):
MUD PH:
MUD CHLORIDES (PPM):
fLUID LOSS (C3):
RESISTIVITY (OHMM) AT TEMPERATURE (DEGF)
HUD AT !"IEASURED TEMPERATURE (NT):
MUD AT MAX CIRCULATING TERMPERI\TURE:
MUD FILTRATE AT MT:
IvIUD CAKE AT MT:
it
NEUTRON TOOL
MATRIX:
MATk.IX DENSITY:
HOLE CORRECTION (IN):
TOOL, S'l'ANDO~'t' (J N) :
EWR FREQUENCY (HZ):
02 -HAR- ()3
Insite
4.3
Memory
12516.0
11562.0
12510.0
80.6
96.0
TOOL NUMBER
82758
125631
3.750
10950.0
Flo Pro
8.80
55.0
9.5
20000
7.8
.200
.000
.210
.150
68.0
171.0
68.0
68. (1
)
)
REMARKS:
$
~
Data Format Specification Record
Dat:a Reco,rd 'l'ype.................. 0
Data Specification Block Type.....O
Logging Direction................ . Down
Optical log depth units...........Feet
Data Reference Point..............Undefined
Frame Spacing.....................60 .1IN
Max frames per record.............Undefined
Absent. value...................... -999
Dept.h Unit,s.......................
Datum Spec; ficati..on Block sub-type... 0
Name Service Order Units Si.ze Nsam Rep Code Offset Channel
OF. PT FT 4 1 68 0 ]
ROP MWD050 fT/H 4 1 68 4 ,.,
L
GR MWD050 API 4 1 68 8 3
RPX MWD050 OHMM 4 1 68 12 4
RPS MWD050 OHMM 4 1 68 16 5
RPM MWD050 OHMM 4 1 68 20 6
RPD MWD050 OHMM 4 1 68 24 7
FET MWD050 HOUR 4 1 68 28 8
First Last
Name Service Unit Min Max Mean Nsam Reading Reading
DEPT FT 11517 12516 12016.5 1999 11517 12516
ROP MWD050 FT/H 20.57 788.78 96.0;:26 1906 11563.5 12516
GR MWDO.50 API 22.38 333.44 60.80.52 1910 11.51'/ 124/1..5
RPX MWD050 OHMM 1.16 2000 11.5299 1907 11531.5 12484.5
RPS MWD050 OHMM 1.41 2000 10.6619 1907 11531. 5 12481. 5
RPM MWD050 OHMM 1. 51 104.65 B.151'!7 1907 11531.5 12484.5
RPD MWD050 OHMM 1.9 2000 13.1448 1907 11531.5 12484.5
FET MfrJD050 HOUR 0.26 37.74 2.16418 1907 11531. 5 12484.5
First Reading For Entire File..........11517
Last Reading For Entire File.. .... .....12516
File Trailer
Service name.............STSLIB.005
Service Sub Level Name...
Ve r s i 0 tl N urnt) e r . . . . . . . . . . . 1 . 0 . 0
Date of Generation.......03/05/11
Maximum Physical Record..65535
File Type................ LO
Next File Name...........STSLIB.006
PhysiciÜ EOF
File Hedder
Service name.............STSLIB.006
Service Sub Level Name...
Version Nunher...........l.O.O
Date of Generation.......03/05/11
Maximum Physical Record..65535
File Type................LO
Previou~ file Name.......STSLIC.005
Conunen t Reco ni
FI LE HE1\DER
FILE NUMBER: 6
RAW HWD
Curves and log header data for each bit run in separate files.
BIT RUN NUMBER: 6
DEPTH INCREMENT: .5000
#
FILE SU¡'U-lARï
VENDOR TOOL CODE START DEPTH STOP DEPTH
)
GR
ROP
12161.0
12S16.tJ
1:2671.0
12701.0
"
.?
#
LOG HEADER DATA
DATE LOGGED:
SOFTWARE
SURFACE SOFTWARE VERSION:
DOWNHOLE SOFTWARE VERSION:
DATA TYPE (MEMORY OR REAL-TIME):
'I'D DRILLER (FT):
TOP LOG INTERVAL (FT):
BOTTOH LOG INTERVA,L (FT):
BIT ROTATING SPEED (RPM):
HOLE INCLINATION (DEG
MINIMUM ANGLE:
MAXIMUM ANGLE:
it
TOOL STRING (TOP TO BOTTOM)
VENDOR TOOL CODE TOOL TYPE
GM Dual GR
$
BOREHOLE AND CASING DATA
OPEN HOLE BIT SIZE (IN):
DRILLER f S CASING DE.PT!-! (FT):
It
BOREHOLE CONDITIONS
MUD TYPE:
MUD DENSITY (L8/G):
MUD VISCOSITY IS):
MUD PI-I:
MUD CHLORIDES (PPM):
FLUID LOSS (C3):
RESISTIVITY 10HMM) AT TEMPERATURE (DEGF)
MUD AT MEASURED TEMPERATURE (1'1'1'):
MUD AT M~~ CIRCULATING TERMPERATURE:
MUD FILTRATE AT MT:
MUD CAKE AT MT:
#
NEUTRON TOOL
MATRIX:
MATRIX DENSITY:
HOLE CORRECTION (IN):
if
TOOL STANDOFF (IN):
EWR FREQUENCY (HZ):
It
REMARKS:
$
It
Data Format Specification Record
Data Record Type.................. 0
Data Specification Block Type.....O
Logging Direction...... .... .......Down
Optical log depth units...........Feet
Data Reference Point___.__________Undefined
Frame Spacing.._..................60 .1IN
Max frames per record.............Undefined
l\bsent value............... _ . . . . . . -999
Depth Units.......................
DaLUlil SµecificéiLioC! Block .sub-Lyµe...O
)
04-MAR-03
Ins.i,te
4.3
Memory
12701.0
12516.0
12701. 0
80.6
96.0
TOOL NUMBER
78012
3.750
10950.0
Flo Pro
8.70
65_0
8.5
22000
8.2
.000
.000
.(WO
.000
.0
167.0
.0
.0
Name Service Order Units Size Nsam Rep Code Offset Channel
DEFT IT <1 1 68 0 1
ROP M'tJD060 FT/H 1 1 68 2
GR MWD060 API 4 1 68 8 3
Fi rst Last
Name Service Unit Min Max Mean Nsam Readin.;¡ Read n
DEPT FT 124G4 12701 12582..5 475 124G4 1 ¡
R.OP MV'1DO 6 0 FT!H 0.63 539.71 62_9457 370 1:2516.5 1 7
l:;R MWDU6U .I.\.P1 19.49 138.98 48.8991 421 12464 1 6
)
)
first Reading For Entire File..........12464
Last Reading For Entire File...........12701
File Trailer
Se.t"vice name............. STSLIB. 006
Service Sub Level Name...
Version Number...........l.O.O
Date of Generation.......03/05/14
Maximum Physical Record..65535
Fil e Type................ LO
Next File Name...........STSLIB.007
Physical EOF
Tape Trailer'
Service name.............LISTPE
Date.....................03/05/14
Origin. . . . . . . . . . . . . . . . . . . STS
Tape Name................ UNKNOWN
Continuati,on Number...... 01
Next Tape Name...........UNKNOWN
Comment:s. . . . . . . . . . . . . . . . . STS LIS Writing Library. Scientific Technical Services
Reel TL'ailcr"
Service namc........_.__.LISTPE
Date.....................03/05/14
Origin...................STS
Reel Name................ UNKNOWN
Continuation Number...... .01
Next Reel Name...........UNKNOWN
Comments.................S'I'S LIS Writing Library. Scientific Technical Services
Physical EOF
Physical EOF
End Of LIS File
)
')
dCJé9'~ 35
\ \ q ~Ll
Sperry-Sun Drilling Services
LIS Scan Utility
$Revision: 3 $
LisLib $Revision: 4 $
Tue May 13 15:54:19 2003
Reel Header
Service name.............LISTPE
Date. . . . . . . . . . . . . . . . . . . . .03/05/13
Origin. . . . . . . . . . . . . . . . . . . STS
Reel Name................UNKNOWN
Continuation Number......Ol
Previous Reel Name....... UNKl\jOWN
Cornments.................STS LIS Writing Library. Scientific Technical Services
Tape Header
Service name.............LISTPE
Dale. . . . . . . . . . . . . . . . . . . . .03/05/13
Origin. . . .. . . . . . . . . .. . . . . STS
Tape Name................UNKNOWN
Continuation Nuuber......Ol
Previous Tape Name.......UNKNOWN
Cornments.................STS LIS Writing Library. Scientific Technical Services
Physj.cal EOF
Comment H.ecord
TAPE HE,ADER
Prudhoe Bay
MWD/MAD LOGS
II
WELL NAME:
API NUMBER:
OPERATOR:
LOGGING COMPANY:
TAPE CREATIOI\J DATE:
II
,JOB DATlI..
W-19A Ll
500292200660
DP Exploration (Alaska), Inc.
Sp<Õ'r ry Sun
13-MAY-03
JOB NUMBER:
LOGGING ENGINEER:
OPERATOR WITNESS:
MWD RUN 1
K-MW-2299019
S.. LATZ
SEVCIK/SARDE
MWD RUN 3
J{-MW-2299019
S. LATZ
SE.VCIK/SARGE
MWD RUN 4
K-MW-2299019
S. LATZ
SEVCIK/SARDE
~TOB NUMBER:
LOGGING ENGINEER:
OPERATOR WITNESS:
M\I'JD RUN 5
K-MW-22.99019
S. LATZ
SEVCIK/SARGE
MWD RUN 6
K-MW-2299019
S. LATZ
SEVCIK/SARGE
#
SURFACE LOCATION
SECTION:
TorÑNSHI P:
RANGE:
fNL:
FSL:
FEL:
fWL:
ELEVATION (FT FROM
KELLY BUSHING:
DERRICr~ FLOOR:
GROUND LEVEL:
21
UN
12E
695
1181
MSL 0)
bJ.4U
.00
·17.83
#
WELL CASING RECORD
1ST STRING
)Nl) STk ì N(~
3RD STRING
PRODUCTION STRING
Oel::N HOLE
BIT SIZE (IN)
3.750
CASING
SIZE (IN)
4.5C10
ORILLI::RS
DEPTH (eT)
10~50.0
~;-'.~ 1i""JlI ,f.~ L E\ ff~-'-'" ~:"'';:G
t,_..?· ¡;-~"", g¡ ~ ¡t~· ~ if ~.=" j;
~ ~. ii....-:: 'V ~-= g J b; ltJ
#
REì~'1ARh~S :
Ii If,} () r) ~·r\i^¡7\
tJ IJ t " \. L 1.- :./ ,; ...'
Pt~aSkÐ U~'; ~L
c;~:;;·~¡:'. (;(·~·~·~a·~~~·::~·J?l
/\n C'~··~ Oré¡i~~8
~b ~ ,Y\~
)
)
1. ALL DEPTHS ARE BIT DEPTHS UNLESS OTHERWISE NOTED. THESE DEPTHS ARE
MEASURED DEPTH (MD).
2. ALL VERTICAL DEPTHS ARE TRUE VERTICAL DEPTH - SUBSEA (TVDSS).
3. MWD RUN 1 WAS DIRECTIONAL WITH GAMMA MODULE (GM) UTILIZIING
GEIGER-MUELLER TUBE DETECTORS.
4. MWD RUN 2 DID NOT MAKE ANY FOOTAGE. NO DATA IS PRESENTED.
5. MWD RUN 3 WAS DIRECTIONAL WITH GM.
6. MWD RUNS 4-5 WERE DIRECTIONAL WITH GM, AND ELECTROMAGNETIC WAVE
RESISTIVITY PHASE-4 (EWR4). A MAD PASS (UPHOLE) WAS PERFORMED
PRIOR TO DRILLING OUT FOR RUN 4. THESE DATA (EWR4) WERE DEPTH
CORRECTED TO THE DRILLED MWD RUN 3 DATA AND ARE INCI.,UDED WITH THE
RUN 3 DATA.
7. MWD RUN 6 WAS DIRECTIONAL WITH GM.
8. MWD DATA WAS DEPTH SHIFTED TO THE SCHLUMBERGER GAMMA [-<.AY LOG OF
3/6/2003, PER THE 5/12/2003 E-MAIL FROM D. SCHNORR (BP EXPLORATION).
HEADER AND RUN INFORMA'I'ION DATA RETAIN DRILLER'S DEPTH REFERENCES.
9. MWD RUNS 1 - 6 REPRESENT WELL W-19A L1 WITH API#: 50-029-22006-60.
TIUS WELL REACTIED l\ TOTAL DEPTH (TO) OF 12675'MD 1 8870'TVDSS.
SROP ~
SGRC
SEX?
SESP
SE"MP
SEDP
S FXE --
$
SMOOTHED RATE OF PENETRATION WHILE DRILLING.
SMOOTHED GAMMA RAY COMBINED.
SMOOTHED PHASE SHIFT-DERIVED RESISTIVITY (EXTRA SHALLOW SPACING).
SMOOTHED PHASE SHIFT-DERIVED RESISTIVITY (SHALLOW SPACING) .
SMOO'I'HE,~l) PHASE'. SHl,F'I'-DERIVE'.D RE',SIS'l'lVI,'I'Y (M\:",l),ILJM SPACJNCì).
SMOOTHED PHASE SHIFT-DERIVED RESISTIVITY (DEEP SPACING).
SMOOTHED FORMA1~ION EXPOSURE TIME.
File Header
Service name.............STSLIB.001
Service Sub Level Name.._
Version Number.......... .1.0.0
Date of Generation.......03/05/13
Maximum Physical Record..65535
Fi 1 e Type................ LO
Previous File Name.......STSLIB.OOO
Comment Record
fILE HEADER
fILE NUMBER:
EDITED MERGED MWD
Depth shìtted
DEPTH INCREMENT:
Ii
FILE SUMMARY
PBU TOOL CODE
FET
RPD
RPM
RPS
RPX
GR
ROP
$
1
and clìpped curves; all bìt runs merged.
.5000
START DEPTH
10926.0
10926.0
10926.0
10926.0
10926.0
10931. 5
10959.5
STOP DEPTH
12318.0
12318.0
12318.0
12318.0
12318.0
12649.0
12677.0
ff
BASELINE CURVE FOR SI-!I FTS:
CURVE SHIFT DATA (IvlEASURED DEPTH)
--------- EQUIVALENT UNSHIFTED DEPTH ---------
Bl\SELINE DEPTH
10632.0
10933.5
10937.0
10939.0
10954.0
10960.5
10969.0
109:5.5
GR
10931.5
10933.0
10936.0
10938.5
10954.0
10960.5
10968.5
109:5.5
)
10980.0
10987.5
10991.5
11015.0
11011.5
11020.0
11021.5
11024.0
11034.0
11038.5
11046.:)
11061.5
12679.5
$
10980.0
1098'/.5
10991.:)
11011.5
1101'1'.5
11020.5
11023.0
11024.5
11033.0
11036.5
11044.5
11059.0
12677.0
#
MERGED DATA SOURCE
I?BU TOOL CODE
MWD
MWD
MWD
MWD
MWD
$
BIT RUN NO
1
::3
4
5
6
MERGE TOI?
10931.0
10925.5
11282.5
11517 . 0
12300.0
MERGE BASE
11038.5
11326.5
11,563.0
12315.5
12674.5
ff
REMARKS:
MERGED MAIN PASS.
$
it
Data Format Specification Record
Data Record Type..................O
Data Speci.fication Block Type..... 0
Logging Direction..... ............Down
Opt.ical log depth units........... Feet
Data Reference Point..............Undefined
Frame Spacing.....................60 .1IN
Max frames per record.............Undefined
Absent value...................... -999
Depth Units.......................
Datum Specification Block sub-type...O
Name Service Order Units 3i.,ze Nsam Rep Code Offset Channel
DEI?'!' FT 4 1 68 0 1
ROP MWD FT/H 4 1 68 4 2
GR MWD API 4 1 68 8 3
RPX HWD OHHM 4 1 68 1 ') 4
.L
RPS NviJD OHMM 4 1 68 16 5
RP1'1 MWD OHN1'1 ·1 1 68 20 6
RPD MWD OHMM, 4 1 68 24 ./
FET MWD HOUR 4 1 68 28 8
First Last
Name Service? Unit Min Max Mean N8am Reading Readinq
DEPT FT 10926 12677 11801. 5 3503 10926 12677
ROF 1'1'V-JD fT/H 0.07 851.26 75.7544 3436 10959.5 1267;
GR MWD API 21.7 510.86 69.5917 3436 10931 .5 12649
RPX MV'lD OHMM 0.31 2000 17.7595 2785 109 6 12318
RPS MWD OHMM 0.1 2000 29.5877 278tJ 109 6 12318
RPM M'"v-JD OHMH 0.11 2000 21. 4 987 2785 109 6 12318
RPD MWD OHMM 0.03 2000 35.2111 2785 109 6 12318
fST MWD HOUR 0.26 ~i:I. jï '1.0::1946 ;Oi:l~ 109 6 12j1i:1
first Reading For Entire file..........l0926
Last Reddirtg For E:flLire File...........12G7i
file Trdiler
Service n~me___________..STSLIB.OOl
Service Sub Level Name...
Version Number...........l.ü.0
D~te of Gcner~tion.._.___03/05/13
Maximum Physical Record..65535
File Type............... .LO
Next ~ile Name.___..._...3T3LIG.OO~
)
Physical EOF
File ¡-leader
Service name.............STSLIB.002
Service Sub Level Name...
Version Number.......... .1.0.0
Date of Generation...... .03/05/13
Maximum Physical Record..65535
F i1 e 'I' ype. . . . . . . . . . . . . . . . LO
Previous File Name.......STSLIB.OOl
)
Comment Record
fILE HEADER
FILE NUMBER:
RAW MWD
Curves and log header data for each bit run in separate files.
BIT RUN NUMBER: 1
DEPTH INCREMENT: .5000
#
FILE SUMMARY
VENDOR TOOL CODE START DEPTH
GR 10931.0
ROP 10959.5
2
STOP DEPTH
11012.0
11038.5
$
#
LOG HEADER DATA
DATE LOGGED:
SOFTWARE
SURFACE SOFTWARE VERSION:
DOWNHOLE SOFTWARE VERSION:
DATA TYPE (MEMORY OR REAL-TIME):
TO DRILLER (FT):
TOP LOG INTERVAL (FT):
BOTTOM LOG INTERVAL (FT):
BIT ROTATING SPEED (RPM):
HOLE INCLINATION (DEG
MINIMUM ANGLE:
MAXIMUM ANGLE:
TOOL STRING (TOP TO BOTTOH)
VEN DOI~ TOOL CODE TOOL TY PE
GM Dual GR
'"
y
BOREHOLE AND CASING DATA
OPEN HOLE BIT SIZE (IN):
DRILLER'S CASING DEPTH (FT):
BOREHOLE CONDITIONS
MUD TYPE:
MUD DENSITY (LB/G):
MUD VISCOSITY (S):
MUD PH:
MUD CHLORIDES (PPM):
FLUID LOSS (C3):
RESISTIVITY (OHMM) AT TEMPERATURE (DEGF)
MUD AT MEASURED TEMPERATURE (MT):
MUD AT MAX CIRCULATING TERMPERATURE:
MUD FILTRATE AT MT:
NUD CAKE AT HT:
NEUTRON TOOL
¡vIATRIX:
MATRIX DENSITY:
HOLE CORRECTION (IN):
TOOL STNWOff (IN):
EWR FREQUENCY (HZ):
REMARKS:
~
26-FE:B-03
Insite
4.3
Memory
11039.0
10930.0
11039.0
41.1
49.5
TOOL NUMBER
827 58
3.750
10950.0
Fl0 Pro
8.80
65.0
9.0
23000
8.0
.000
.000
.000
.000
. I)
155.0
. u
.0
)
)
Data Format Specification Record
Data Record Type.................. 0
Data Specification Block. Type.....O
Logging Direction.................Down
Optical log depth units...........Feet
Data Reference Point..............Unde[ined
Frame Spacing.....................60 .1IN
Max frames per record.............Undefined
.i;.bsent value...................... -999
Depth Units.......................
Datum Specification Block sub-type...O
Name Service Order Units Size Nsam Rep Code Offset Channel
DEPT FT 4 1 68 0 1
ROP MWDOI0 FT/H 4 1 68 4 2
GR MWDOI0 API 4 1 68 8 3
First Last
Name Se.rvice Unit Min Max Mean Nsam Reading Reading
DEPT FT 10931 11038.5 10984.8 216 10931 11038.5
ROP MWDOI0 FT/H 0.99 66.75 23.212 159 10959.5 11038.5
GR MWD010 API 50.07 282.93 101. 263 163 10931 11012
First Reading For Entire Fi1e..........l0931
Last Reading tor: EnLl.r:e tile.......... .11038.5
File Trailer
Service name.............STSLIB.002
Service Sub Level Name...
Version Number.......... .1.0.0
Date of Gencration.......03/05/13
Maximum Physical Record..65535
Fi 1 e Type................ LO
Next File Name...........STSLIB.003
Physical EOF
File Header
Service name............ .STSLIB.003
Service Sub Level Name...
Version Number...........1.0.0
Date of Generation.......03/05/13
Maximum Physical Record..65535
File Type................LO
Previous file Name.......STSLIC.002
Commenl RecoL'd
E'ILE HEADER
FILE NUMBER:
RAW MWD
Curves and log
BIT RUN NUMBER:
DEPTH INCREMENT:
#
FILE SUMHARY
VENDOR TOOL CODE
FET
RPivj
RDQ
RPX
3
header data for each bit run in separate files.
3
.5000
RPD
GR
ROP
$
ST.Zl.RT DEPTH
1()92~.~
10925.5
10925.5
1U9;Z5.~
10925.5
11011.0
11039.0
STOP DEPTH
11299.5
11299.5
11299.5
11299.5
11299.5
11299.5
11326.5
LOG HE.ZI..DER DATA
DATE 1,OGGED:
SOfT¡-mRS
SURFACE SOfTW.A.RE VERSION:
27-FEB-(Y3
Insite
)
DOWNHOLE SOFTWARE VERSION:
DATA TYPE (MEMORY OR REAL-TIME):
TD DRILLER (FT):
TOP LOG INTERVAL (FT):
BOTTOM LOG INTERVAL (F'l'):
BIT ROTATING SPEED (RPM):
HOLE INCLINATION (DEG
MINIMUM ANGLE:
MAXHmM ANGLE:
it
TOOL STRING (TOP TO
VENDOR TOOL CODE
GM
EIÑR4
$
BOTTOM)
TOOL TYPE
Dual GR
ELECTROMAG. RESIS. 4
tI
BOREHOLE AND CASING DATA
OPEN HOLE BIT SIZE (IN):
DRILLER'S CASING DEPTH (FT):
tI
BOREHOLE CONDITIONS
MUD TYPE:
MUD DENSITY (LB/G):
MUD VISCOSITY (3):
MUD PH:
MUD CHLORIDES (PPM):
FLUID LOSS (C3):
RESISTIVITY (OHMM) AT TEMPERATURE (DEGF)
MUD AT MEASURED TEMPERATURE (NT):
HUD AT MA.':{ CIRCULATING TERMPERATURE:
MUD fILTRATE AT MT:
MUD CAKE A.T MT:
ff
NEUTRON TOOL
MATRIX:
MATRIX DENSITY:
HOLE CORRECTION (IN):
#
TOOL S'['ANIJOF'F' (,LN):
EWR FREQUENCY (HZ):
tI
REMARKS:
$
tI
Data Format Specification Record
Data Record Type.................. 0
Data Specification Block: Type.....O
Logging Direction.................Down
Optical log depth units...........Feet
Data Reference Point..............Undefined
Frame Spacing.....................60 .lIN
Max frames per record.............Undefined
Absent value...................... -999
Dep1~h Units.......................
Datum Specification Block sub-ty~e...O
)
1.3
Memory
11326.0
11039.0
11326. Ü
53.7
89.5
TOOL NUMBER
78012
125631
3.750
10950.0
F loP ro
8.80
65.0
8.5
24000
6.8
.000
.000
.000
.000
.0
166.0
.0
.0
Name Service Order Units Size Nsam Rep Code Offset Channel
DEPT FT 4 1 68 0 1
ROP MWDOJO FT/H 4 1 68 4 "
L
GR Jv1VIID 03 0 _~PI -1 1 68 8 3
RPX MWDOjO OHMM 4 1 6B 12 4
RPS HltIJD030 o HHiv! i 1 68 16 5
RP~1 Ml^JD030 OHMM -1 1 68 20 (3
RFD MWDOJO OHMM 4 1 62- 24
FET NWDOJO HOUR 4 1 68 LO S
First L.::lst
N::¡rn<? Sí?rvìct? [.lni t Min Ma~: M<?an Nsam R<?::¡din,] R<?adi n';)
DEE'T E'T 1ü9?5.5 11326.5 111:2 6 803 10925.5 11326. :)
ReF ~·1t"JDO 3 0 FT / 11 0.0: :0.34 3:.4293 5:6 11039 113:26.5
GR MW0030 API 34.78 510.86 138.57 .578 11011 11299.5
R!?X fv[NDO 3 0 OHMJv[ 0.31 2000 116.'168 719 10925.5 11299.5
RPS Mí^JD03ü OHMM 0.1 2000 83.6203 149 1092S.S 11299.5
)
')
RPM
RPD
fET
MWD030 OHMM
MWD030 OHMM
MWD030 HOUR
0.11
0.03
7.52
2000
2000
58.37
57.4159
98.3842
22.8232
749
749
749
10925.5
10925.5
10925.5
11299.5
11299.5
11299.5
first Reading For Entire File..........10925.5
Last Reading for Entire File...........11326.5
File Trailer
Service name.............STSLIB.003
Service Sub Level Name...
Version Number.......... .1.0.0
Date of Generation.......03/05/13
Maximum Physical Record..65535
File Type................ 1..0
Next File ¡\lame........... STSLIB. 004
Physical EOF
File Header
Service name.............STSLIB.001
Service Sub Level Name...
Vc:;)rsion NumbeL·.......... .1.0.0
Date of Generation.......03/05/13
Maximum Physical Record..65535
File Type................LO
Previous File Name.......STSLIB.003
Comment RecoL'd
FILE HEADER
FILE NUMBER:
RAW MWD
Curves and log
BIT RUN NUMBER:
DEPTH INCREMENT:
#
FILE SUMMARY
VENDOR TOOL CODE
GR
FE '1'
RPD
RPM
RPS
RPX
ROP
$
header data for each bit run in separate files.
4
.5000
START DEPTH
11282.5
11297.5
11297.5
1129'/.5
11297.5
11297.5
11327.0
STOP DEPTH
11561. 5
11563.0
11561. 5
11561. 5
11561. 5
11561. 5
11.563.0
II
LOG HEADER DATA
DATE LOGGED:
SOFTWARE
SURF.A.CE SOFTWARE VERSION:
DOWNHOLE SOFTWARE VERSION:
DATA TYPE (MEMORY OR REAL-TIME):
TO DRILLER (fT):
TOP LOG INTERVAL (FT):
BOTTOM LOG INTERVAL (FT):
BIT ROTATING SPEED (RPM):
HOLE INCLINATION (DEG
MINIMUM ANGLE:
NAXU1UM ANGLE:
28-FEB-OJ
Ini:d te
4.3
Memory
11562.0
11326.0
11562.0
SU.t!
88."7
TOOL STRING (TOr TO BOTTOM)
VENDOR TOOL CODE TOOL TYPE
GM Du~l GR
EWR4 ELECTROM.A.G. RES IS.
TOOL NUHBER
82758
125631
.;0
BOREHOLE AND CASING DATA
OPEN HOLE BIT SIZE (IN):
DRILLER'S CASING DEPTH (fT):
3.750
109~O.U
BOREHOLE CONDITIONS
)
')
MUD TYPE:
MUD DENSITY (LB/G):
MUD V~SCOSITY (S):
MUD PH:
MUD CHLORIDES (PPM):
FLUID LOSS (C3):
RESISTIVITY (OHMM) 1\'1' TEMPEHI\TURE (DEGF)
MUD AT MEASURED TEMPERATURE (MT):
MUD AT MAX CIRCULATING TERMPERATURE:
MUD FILTRATE AT MT:
MUD CAKE AT MT:
Flo Pro
8.80
55.0
8.5
26000
5.2
.090
.040
.140
.170
68.0
176.0
68.0
68.0
#
NEUTRON TOOL
MATRIX:
MATRIX DENSITY:
HOLE CORRECTION (IN):
#
TOOL STANDOFF (IN):
EWR FREQUENCY (HZ):
REMA.RKS:
$
#
Data Format Specification Record
Data Eeco.cd Type.................. 0
Data Specification Block Type.....O
Logging Direction.................Down
Optical log depth units...........Feet
Data Reference Point..............Undefined
Frame Spacing.....................60 .1IN
Max frames per record.............Undefined
Absent value...................... -999
Depth Units. . . . . . . . . . . . . . . . . . . . . . .
Datum Specification Block sub-type...O
Name Service Order Units Size Nsam Rsp Code Offset Channel
DEPT FT 4 1 68 0 1
Rap MWD040 FT/H 4 1 68 4 2
GR MWD010 API 1 1 68 8 3
EPX MWD040 OI-IMM 4 1 68 12 4
RPS MWD040 OI-lMM 4 1 68 16 S
RPM MWD040 OHMM 4 1 68 20 6
EPD MWD040 OHMM 4 1 68 24 /
FET ["!WD040 HOUR 4 1 68 28 8
First Last
Name Service Uni.t Min Max Mean Nsam Reading Reading
DEPT FT 11282. ~) 11563 11422.8 562 11282.5 11563
Rap MIAID040 FT/H 3.88 851.26 77.8147 473 11327 11563
GR MWD040 API 24.76 143.1 tJO./449 tJ59 11282. tJ 11561. .5
RPX MWD040 OH)v!M 2.83 14.28 7.57077 529 11297.5 11561.5
RPS MWD040 OHMM 2.79 16.3 7.96611 529 11297.5 11561.5
RPM MWD040 OHMM 2.85 1"1.1 8.0382 529 1129'/.5 11561. .5
RPD MWD040 OHMM 3.32 14.38 7.45957 529 11297.5 11561.5
FET MWD040 !lOUR 0.44 9.37 1.93053 532 11297.5 11563
First Re~ding For Entire File..........11282.5
Last Reading For Entire File...........11563
File Trailer
Service n.:Jme............ .STSLIB.OO··1
Service Sub Level Name...
'v'el';:;iorl Nuwber.......... .1.0.0
Date of Generation.......03/05/13
Maximum Physical Record..655j~
t.Lle Type............... .LO
Next File N~me...........STSLIB.005
Phvsic::tl EOF
)
File Header
Service name............. STSLIB. 005
Service Sub Level Nan~...
Version Number.......... .1.0.0
Date of Generation.......03/ü5/13
Maximum Physical Record..65535
File Type................ LO
Previous File Name.......STSLIB.004
Comment Record
FILE HEADER
FILE NUMBER:
RAW MWD
Curves and log
BIT RUN NUMBER:
DEP'l'H INCREMENT:
#
FILE SUMMARY
VENDOR TOOL CODE
GR
RPX
RPS
RPM
RPD
E'ET
ROP
5
)
header data for each bit run in separate files.
5
.5000
START DEPTH
11517.0
11531. 5
11531.5
11531.5
11531. 5
11531. 5
11563..5
STOP DEPTH
12315.5
12315..5
12315.5
12315.5
12315.5
12315.5
12315.5
è
y
#
LOG HEADER DATA
DATE LOGGED:
SOFTWARE
SURFACE SOFTWARE VERSION:
DOWNHOLE SOFTWARE VERSION:
DATA TYPE (MEMORY OR REAL-TIME):
'I'D DRILLER (FT):
TOP LOG INTERVAL (£''1'):
BOTTOM LOG INTERVAL (£''1'):
BIT ROTATING SPEED (RPM):
HOLE INCLINATION (DEG
MINIMUM ANGLE:
MAXIMUM ANGLE.:
#
TOOL STRING (TOP '1'0 BOTTOM)
VENDOR TOOL CODE TOOL TYPE
GM Dual GR
EWR4 ELECTROMAG. RESIS. 4
¢..
y
BOREHOLE AND CASING DATA
OPEN HOLE BIT SIZE (IN):
DRILLER'S CASING DEPTH (FT):
#
BOREHOLE CONDITIONS
MUD TYPE:
MUD DENSITY (LB/G):
MUD VISCOSITY (S):
MUD PI-I:
MUD CHLORIDES (PPM):
FLUID LOSS (C3):
RESISTIVITY (OHr1M) AT TEMPERATURE (OEGF)
MUD AT MEASURED TEMPERATURE (MT):
MUD AT MAX CIRCULATING TERMPERATURE:
MUD FILTRATE AT MT:
MIJD C}\KE AT MT:
NEUTRON TOOL
HATRIX:
MATRIX DENSITY:
HOLE CORRECTION (IN]:
TOOL STANDOFf (IN):
EWR FREQUENCY (HZ):
REHARK:3:
02-MAR-03
Insite
4.3
Memory
12316.0
11562.0
12316.0
80.6
96.0
TOOL NUMBER
82758
125631
3.750
10950.0
Flo Pro
8.80
55.0
9.5
20000
7.8
00
00
10
50
68.0
l'il.lJ
68.0
68.0
')
)
¢
""
II
Data Format Specification Record
Data Record Type.................. 0
Data specification Block Type.....O
Logging Direction.................Down
Optical log depth units...........Feet
Data Reference Point..............Undefined
Frame Spacing.....................60 .lIN
Max frames per record.............Undefined
Absent value...................... -999
Depth Uni ts . . . . . . . . . . . . . . . . . . . . . . .
Datum Specification Block sub-ty-pe... 0
Name Service Order Units Size Nsam Rep Code Offset Channel
DEPT FT 4 1 68 0 1
ROP HWD050 FT/H 4 1 68 4 2
GR MWD050 API 4 1 68 8 J
RPX MWDO~)O OHMM 4 1 68 12 4
RPS MWD050 OHMM 1\ 1 68 16 5
RPM MWD050 OIIMM 4 1 68 20 6
RPD MWD050 OHMM 4 1 68 24 7
FET MWD050 HOUR 4 1 68 28 8
First Last
Name Service Unit Min Max Mean Nsarn Reading Reading
DEPT FT llS17 12315.':¡ 11916.3 1598 11517 12315.5
ROP MWD050 FT/H 33.37 788.78 100.887 1505 11563.5 12315.5
GR MWD050 API 22.38 333.44 56.9112 1598 11517 12315.5
RPX MWD050 OHMM 1.16 2000 12.6705 1569 1l531. 5 12315.5
RPS MWD050 OHMM 1. 41 2000 11.5014 1569 11531.5 12315.5
RPM MWD050 OHMM. 1. 51 104.65 8.373 1569 11531.5 12315.5
RPD MWD050 OHMM 1.9 2000 14.5552 1569 11531.5 12315.5
fET Mt^JD050 ¡lOUR 0.26 37.74 2.35843 1569 11.531.5 12315.5
First Reading For Entire Fi1e..........11511
Last Reading For Entire File...........12315.5
File Trailer
Service name.............STSLIB.005
Service Sub Level Name...
Ver'sian Number.......... .1.0.0
Date of Generation.......03/05/13
Maximum Physical Record..65535
File Type................ LO
Next File Name...........STSLIB.006
Physical EOF
File Header
Service name.............STSLIB.006
Service Sub Level Name...
Ve.c:s.i.on Number.......... .1.0.0
Date of Gcneration.......03/05/13
Maximum Physical Record..65535
File Type................LO
Previous File Name.......STSLIB.005
Comment Recüni
FI LE HEl\DER
fILE NUMBER: 6
R.AW MWD
Curves and log header data for each bit run in separate files.
BIT RUN NUMBER: 6
DEPTH INCREMENT: .5000
#
FI LE SUf-TMARY
VENDOR TOOL CODE START DEPTH STOP DEPTH
GR 12300.0 12646.5
)
..I,
ROP
$
12316.0
12674.5
#
LOG HEPI.DER m\TA
DATE LOGGED:
SOFTWARE
SURFACE SOFTWARE VERSION:
DOWNHOLE SOFTWA,RE VERSION:
DATA TYPE (HEMORY OR REAL-TIME) :
TO DRILLER (FT):
TOP LOG INTERVAL (FT):
BOTTOM LOG INTERVAL (FT):
BIT ROTATING SPEED (RPM):
HOLE INCLINATION (DEG
MINIMUM ANGLE:
MAXIMUM ANGLE:
#
TOOL STRING (TOP TO BOTTOM)
VENDOR TOOL CODE TOOL TYPE
GM Dual GR
$
#
BOREHOLE AND CASING DATA
OPEN HOLE BIT SIZE (IN):
DRILLER'S CASING DEPTH (FT):
#
BOREHOLE CONDI'rrONS
MUD TYPE:
MUD DENSITY (LB/G):
MUD VISCOSITY (S):
MUD PH:
MUD CHLORIDES (PPM):
FLUID LOSS (C3):
RESISTIVITY (OHMM) AT TEMPERATURE (DEGf)
MUD AT MEASURED TEMPERATURE (MT):
MUD AT MAX CIRCULATING TERMPERA'l'URE:
MUD FILTRATE AT MT:
,MUD CAKE A'l' MT:
NEUTRON TOOL
MATRIX:
MATRIX DENSITY:
HOLE CORRECTION (IN):
#
TOOL STANDOFF (IN):
EWR FREQUENCY (HZ):
#
REMARKS:
s
,
#
Data Format Specification Record
Data Record Type.................. 0
Data Specification Glock Type... ..0
Logging Direction... ....... .......Down
Optical log depth units...........Fcct
Data Reference Point..............Undcfined
Frame Spacing..................... 60 .1IN
Max frame::; per recürd.............Unde[ined
Absent value..................... .-999
Depth Units.......................
DaLum SpecificdLiüfl Blück. ::;ub-Lype...O
04-MAR-()3
Insitc
4.3
Memox:y
12675.0
12316.0
12675.0
80.6
96.0
TOOL NUMBER
78012
3.750
10950.0
Flo Pro
8.70
65.0
8.5
22000
8.2
.000
.000
.000
.000
Name Service Order Units Size Nsam Rep Code Offset Channel
DEFT FT 4 1 uo 0 1
ROP M~"¡D060 fT/ll 1 68 4 2
.1-
GR MWD060 API 4 1 68 8 3
)
.0
16'1.0
.0
.0
First Last
Name Service Unit Min Max Hean Nsam Reading Readinq
DEFT F'T 12300 12674.5 12oê187.J 750 12300 12G74.
ROP ¡vrr^JDO 6 0 FT/H 1. 08 159.12 61.613 718 1.2316 1267 '1.
GR MWDU6U API 21./ 1/2.88 49.2208 694 1nOO 12646.
)
)
~irst Reading For Entire File..........12300
Last Reading For Entire File...........l2614.5
File Trailer
Service name.............STSLIB.006
Service Sub Level Name...
Version Number...........l.O.O
Date of Generation.......03/05/13
Maximum Physical Record..65535
File Type................ LO
Next File Name...........STSLIB.007
Physical EOF
Tape Tra:Ller
Service name.............LISTPE
Date.................... .03/05/13
Or1g1n...................STS
Tape Name................UNKNOWN
Continuati.,on Number...... 01
NeX't Tape Name........... UNI<:NOWN
Comments............ ... ..STS LIS Writing Library. Scientific Technical Services
Reel Trailer
Service name....._.......LISTPE
Da t e. . . . . . . . . . . . . . . . . . . . . 03/05/13
Origin. . . . . . . . . . . . . . . . . . . STS
Reel Name................ UNliliOWN
(:::f)nLlnuation Number·,.... .01
Next Reel Ni)me...... .....UNKNOWN
Comments................ .STS LIS Writing Library. Scientif.ic Technical Services
Physical EOF
Physical EOF
End Of LIS File