bp
BP Exploration (Alaska) Inc.
Attn: Well Integrity Coordinator, PRB -20
Post Office Box 196612
Anchorage, Alaska 99519 -6612
0
December 30, 2011
Mr. Tom Maunder _ / � 1 4
Alaska Oil and Gas Conservation Commission q�
333 West 7 Avenue
Anchorage, Alaska 99501 pG--( 3
Subject: Corrosion Inhibitor Treatments of MPG -Pad
Dear Mr. Maunder,
Enclosed please find multiple copies of a spreadsheet with a list of wells from MPG -Pad
that were treated with corrosion inhibitor in the surface casing by conductor annulus.
The corrosion inhibitor is engineered to prevent water from entering the annular space
and causing external corrosion that could result in a surface casing leak to atmosphere.
The attached spreadsheet represents the well name, API and PTD numbers, top of
cement depth prior to filling and volumes of corrosion inhibitor used in each conductor.
As per previous agreement with the AOGCC, this letter and spreadsheet serve as
notification that the treatments took place and meet the requirements of form 10 -404,
Report of Sundry Operations.
If you require any additional information, please contact me or my alternate, Gerald
Murphy, at 659 -5102.
Sincerely,
Mehreen Vazir
BPXA, Well Integrity Coordinator
• •
BP Exploration (Alaska) Inc.
Surface Casing by Conductor Annulus Cement, Corrosion inhibitor, Sealant Top-off
Report of Sundry Operations (10-404)
MPG -Pad
10/10/2011
Corrosion
Initial top of Vol. of cement Final top of Cement top off Corrosion inhibitor/
Well Name PTD it API # cement pumped cement date inhibitor sealant date
r ft bbls ft gal
MPG-01 1890290 8 , 50029219270000 Tanko conductor NA NA NA NA NA
MPG -02 1890280 50029219260000 Tanko conductor NA NA NA NA NA
MPG -03A 2042190 50029219420100 Tanko conductor NA NA NA NA NA
MPG -04 1890450 50029219410000 Tanko conductor NA NA NA NA NA
MPG -05 1910230 50029221380000 1.1 NA 1.1 NA 5.1 8/14/2011
MPG -07 1910250 50029221400000 0.1 NA 0.1 NA 3.4 9/4/2011
MPG -08A 1930480 50029221410100 0.2 NA 0.2 NA 2.6 10/10/2011
MPG -09 1971170 50029227790000 1.3 NA 1.3 NA 15.3 10/30/2009
MPG -10 1971180 50029227800000 2.1 NA 2.1 NA 20.4 10/30/2009
MPG -11 1971190 50029227810000 0.8 NA 0.8 NA 5.1 8/14/2011
MPG -12 1971420 50029227920000 1.3 NA 1.3 NA 8.5 8/14/2011
*--'� MPG -13 1971200 50029227820000 1.2 NA 1.2 NA 10.2 10/30/2009
MPG -14 2011330 50029230310000 0.8 NA 0.8 NA 4.3 9/4/2011
MPG -15 1971220 50029227840000 2.9 NA 2.9 NA 34.0 10/30/2009
MPG -16 2032100 50029231890000 1.8 NA 1.8 NA 17.0 8/15/2011
MPG -17 2040130 50029231920000 1.6 NA 1.6 NA 14.5 8/15/2011
MPG -18 2040200 50029231940000 1.6 NA 1.6 NA 13.6 8/15/2011
MPG -19 2041920 50029232280000 1.6 NA 1.6 NA 13.6 8/15/2011
11/01/10
SOMberlep
NO. 5637
Alaska Data & Consulting Services Company: State of Alaska
2525 Gambell Street, Suite 400 Alaska Oil & Gas Cons Comm
Anchorage, AK 99503 -2838 Attn: Christine Shartier
ATTN: Beth 333 West 7th Ave, Suite 100
Anchorage, AK 99501
Well Job # Log Description Date BL Color CD
MPG43 BCRJ -00038 X -FLOW CHECK/IBPSET RECORD 09115110 1 1
MPS-43 AYKP -00104 SCMT 08/26110 1 1
Pi -09 BCRJ -00036 PRODUCTION PROFILE 09112110 1 1
W -37A BD88 -00048 MEM PRODUCTION PROFILE 09111/10 1
W -31A AZ2F -00064 MEM PRODUCTION PROFILE 09116/10 1
06 -19A AWJI -00112 MEM PRODUCTION PROFILE 09/19/10 1 1
12 -OSAL1 BAUJ -00050 MEM PRODUCTION PROFILE 09/20110 1 1
P1 -16 BCRJ -00049 INJECTION PROFILE 10/06110 1 1
04 -03 BCRD -00059 PRODUCTION PROFILE 09127110 1 1 •
P -03A AZ2F -00065 MEM INJECTION PROFILE / 10106/10 1 1
G -198 AWJI -00114 MEM PRODUCTION PROFILE 10/04/10 1 1
Y -36 BD88.00058 M E M G LS 10/09110 1 1
3- 03IJ -33 BCZ2 -00025 PRODUCTION PROFILE J 09/11110 1 1
L -214A BAUJ -00043 MEM INJECTION PROFILE — 09113110 1 i
H -0 AWJI -00118 MEM PRODUCTION PROFILE 10114110 1 1
16.068 BBUO -00023 PRODUCTION PROFILE BP CORRECTION 06108110 1 1
H -38 AZ2F -00068 MEM PRODUCTION PROFILE — 10/16/10 1 1
P2-44 BCRD -00063 PRODUCTION PROFILE 10/15110 1 6 1
8 -138 AYKP -00091 CH EDIT PDC -GR (SCMT) 07/02/10 1
02.228 IOAKA0069 OH MWD /LWD EDIT 07107110 2 1
W -196 6CRJ -00034 CH EDIT PDC -GR (SCMT) 09/07110 1 1
OWDWSE APBPD3WELL FIST REDO - PRINTS 09123110 1
OWDW -NW BBSK -00033 RST 09124/10 1 1
PLEASE ACKNOWLEDGE RECEIPT BY SIGNING AND RETURNING ONE COPY EACH TO:
BP Exploration (Alaska) Inc. Alaska Data & Consulting Services
Petrotechnical Data Center LR2 -1 2525 Gambell Street, Suite 400
900 E. Benson Blvd. Anchorage, AK 99503 -2838
Nov Y
.
a o0'0?'
MEMORANDUM State of Alaska
Alaska Oil and Gas Conservation Commission
TO: Jim Re DATE: Tuesday, October 19, 2010
P.I. Sup ervisor �(� QI I +vl 1� SUBJECT: Mechanical Integrity Tests
BP EXPLORATION (ALASKA) INC
G -13
FROM: John Crisp MILNE PT UNIT SB G -13
Petroleum Inspector
Src: Inspector
Reviewed By:
P.I. Supry T r=
NON - CONFIDENTIAL Comm
Well Name: MILNE PT UNIT SB G -13 API Well Number 50- 029 - 22782 -00 -00 Inspector Name: John Crisp
Insp Num: mitJCr101017193741 Permit Number: 197 -120 -0 Inspection Date: 10/15/2010
Rel Insp Num:
Packe Depth Pretest Initial 15 Min. 30 Min. 45 Min. 60 Min.
Well i G -13 ' Type Inj. V✓ TVD 3903 IA 150 2000 1930 1920
P .T.D 1971200s Ty peTest s PT Test psi 1500 OA
In terval 4YRTST P/` I/ P Tubing 1200 1200 1200 1200
Notes: Monobore Injector. 1.4 bbl pumped for test.
NOV
i
II I
I
I
Tuesday, October 19, 2010 Page I of 1
l _ ;,
PROACTIVE DIAGNOSTIC SERVICES, INC.
ELL LOG
TRA/1/SM/TTAL
To: AOGCC
Christine Mahnken
333 W. 7th Ave
Suite 100
Anchorage, Alaska 99501
(907) 793-1225
RE : Cased Hole/Open Hole/Mechanical Logs and /or Tubing Inspection(Caliper / MTT)
The technical data listed below is being submitted herewith. Please acknowledge receipt by returning
a signed copy of this transmittal letter to the following
BP Exploration (Alaska), Inc.
Petrotechnical Data Center
Attn: Joe Lastufka
LR2-1
900 Benson Blvd.
Anchorage, Alaska 99508
and
•>
ProActive Diagnostic Services, Inc. l 9 ~ ~j
Attn: Robert A. Richey
130 West International Airport Road
Suite C
Anchorage, AK 99518
Fax: (907) 245-8952
~ 1)
2)
injection Profile 27-Jun-10 MPU G13
Injection Profile 29-Jun-10 MPU E-29
Signed
Print Name:
Date
~' rr~^^i
PROACTIVE DIAGNOSTIC SERVICES, INC., 130 W. INTERNATIONAL AIRPORT RD SUITE C, ANCHORAGE, AK 99518
PHONE: (907)245-8951 FAX: {907)245-88952
E-MAIL : ~dsarachorageCa7rrleralorylog.~:om WEBSITE : ~nnnrw.sTterraorvlog.com
BL /EDE 50-029-22782-00
;,
BL/ EDE. ~ '~ --
C:\Documents and SettingslDiane Williams\Desktop\Transmit BP.docx
~
•
~~~
~~
C - ~` 4 k S~ ~~~
€~t~ ~r ~ ~r
4a I li;~
~r I, t / ~/,
4~~ ~ r. 1 5' },F ~ ~1 } P u{ 6 !
t rv7 ~
~ ~ ~ ~e k
k H~
t ~
~
~,.~ ~ ~ ~ '~' l ~ ~ F k ~~ ! 4. E '
p. ( Z ~" ` ~ ~~ ~~ p
~ ~< ~ ~ ~
~ ~t ~ k`11
SEAN PARNELL, GOVERNOR
G`
~,~~ Y ; t ' E u ~~ G j a ~~";y =~
~~~ ~_"~~u~ ~ ~ Nu ~ ~ ~, ~v~~ ~ v`_ ~ ~ ~~ f<
,~
~+ ~+,~~
~A-7~~ OITi ~~ tu~a7 3'~ 333 W. 7th AVENUE, SUITE 100
CO1~T5ER~ATIOrIT COMl-IISSIOI~T ~ ANCHORAGE, ALASKA 99501-3539
PHONE (907) 279-1433
J
FAX (907)276-7542
~'
Mr. Chidiebere Igbokwe
Production Engineer
BP Exploration (Alaska), Inc. ~
P.O. Box 196612 ~ ~..
Anchorage, AK 99519-6612 (,~~~
~ ~
Re: Milne Point Unit Field, Schrader Bluff Fool, MPG-13
Sundry Number: 309-353
Dear Mr. Igbokwe:
~~~~~~~~~~ °°~!~`~' ;~ f~~. 2~C9
Enclosed is the approved Application for Sundry Approval relating to the
above referenced well. Please note the conditions of approval set out in the
enclosed form.
When providing notice for a representative of the Commission to witness any
required test, contact the Commission's petroleum field inspector at (907)
659-3607 (pager).
As provided in AS 31.05.080, within 20 days after written notice of this
decision, or such further time as the Commission grants for good cause
shown, a person affected by it may file with the Commission an application
for rehearing. A request for rehearing is considered timely if it is received by
4:30 PM on the 23rd day following the date of this letter, or the next working
day if the 23rd day falls on a holiday or weekend. A person may not appeal
a Comtnission decision to Superior Court unless rehearing has been
requested.
Sincerely,
Daniel T. Seamount, Jr.
~ Chau-
DATED this Z-`~ day of October, 2009
Encl.
(, ~'~~ ~' ,~y~I~D- I STATE OF ALASKA
~~tit ~ ALASl~L AND GAS CONSERVATION COMMISSI•
~° APPLICATION FOR SUNDRY APPROVALS
~n aac: ~~ ~Rn
~~~~~~~~
~c~ ~ o ~oa~
~.__c__ ~w:e ~: ~t'!e.~ ~"nn~ ~:11t11P111S~~0f1
1. Type of Request: Abandon ^ Suspend ^ Operational shutdown ^ Perforate ^ Re-en er uspend~ ~
~~r
Alter casing ^ Repair well ^ Plug PerForations ^ Stimulate ^ Other Q• Specify
Change approved program ^ Puli Tubing ^ Pertorate New Pool [] Time Extension ^ SET IBP •
2. Operator Name: 4. Current Well Class: 5. Permit to Drill Number:
BP Exploration (Alaska), inc. Development ~ Exploratory ~ 197-1200 -
3. Address: P.O. Box 196612 Stratigraphic ~ Service ~. 6. API Number:
Anchorage, AK 99519-6612 50-029-22782-00-00 .
7. If perforating, closest approach in pool(s) opened by this operation to nearest 8. Well Name and Number:
property line where ownership or landownership changes:
Spacing Exception Required? Yes ^ No ^ MPG-13 .
9. Property Designation (Lease Number): 10. Field/Pool(s):
ADLO-025516 , MILNE POINT UNIT Field / SCHRADER BLUFF Pool .
11. PRESENT WELL CONDITION SUMMARY
Total Depth MD (ft): Total Depth ND (ft): Effective Depth MD (ft): Effective Depth ND (ft): Plugs (measured): Junk (measured):
7421 . 4495.95 , 7292 4393 NONE NONE
Casing Length Size MD ND Burst Collapse
Structural
Conductor 110 20" 91.4# H-40 32 110 32 110 1490 470
Surface
Intermediate
Production 7404 7" 26# L-80 31 7404 31 4482 7240 5410
Liner
Perforation Depth MD (ft): Perforation Depth TVD (ft): Tubing Size: Tubing Grade: Tubing MD (ft):
SEE ATTACHED - - 3.1/2" 9.2# L-80 SURFACE - 6725'
Packers and SSSV Tvqe: 7" BAKER S-3 PKR Packers and SSSV MD and ND (ft): 6658' 3903'
12. Attachments: Description Summary of Proposal Q 13. Well Class after proposed work:
Detailed Operations Program ^ BOP Sketch ^ Exploratory ^ Development ^ Service ^~ _
14. Estimated Date for 15. Well Status after proposed work:
Commencing Operations: 11/2/2009 Oil ^ Gas ^ WDSPL ^ Plugged ^
16. Verbal Approval: Date: WINJ ^~ ` GINJ ^ WAG ^ Abandoned ^
Commission Representative: GSTOR ^ SPLUG ^
17. I hereby certify that the foregoing is true and correct to the best of my knowledge. Contact Chidiebere Igbokwe
P~inted Name Chidiebere Igbokwe Title P E
Signatur Phone Date
564-4795 10/19/2009 Prepared by Gary Preble 564-4944
COMMISSION USE ONLY
Conditions of approval: Notify Commission so that a representative may witness Sundry Number. `~~/ /~~3
Plug Integrity ^ BOP Test ^ Mechanical Integrity Test ^ Location Clearance ^
Other:
Subsequent Form Required:
l • yo`-~
APPROVED BY
COMMISSIONER THE COMMISSION
A
r
v
d b
Date: l~ l Z~ ~
pp
o
e
y:
v ~
~ ~~ ~RiGINA ~U-z~o~
L
Form 10-403 Revised 07/2009
..- :,.~~~
.~-- ~- f~~~~
5~~~~,~
MPG-13
197-120
PERF OTTACHMENT
•
Sw Name Operation Date Perf Operation Code Meas Depth Top Meas Depth Base Tvd Depth Top Tvd Depth Base
MPG-13 6/8/98 PER 7,094. 7,130. 4,237.87 4,266.03
MPG-13 6/8/98 PER 7,190. 7,224. 4,313.11 4,339.88
MPG-13 12/2/02 FIL 7,134. 7,321. 4,269.16 4,416.57
MPG-13 2/11/08 APF 6,922. 6,940. 4,104.14 4,118.08
AB ABANDONED PER PERF
APF ADD PERF RPF REPERF
BPP BRIDGE PLUG P ULLED SL SLOTTED LINER
BPS BRIDGE PLUG SET SPR SAND PLUG REMOVED
FCO FILL CLEAN OUT SPS SAND PLUG SET
FIL FILL SQF SQUEEZE FAILED
MIR MECHANICAL ISOLATED REMOVED SQZ SQUEEZE
MIS MECHANICAL ISOLATED STC STRADDLE PACK, CLOSED
fVILK MECHANICAL LEAK STO STRADDLE PACK, OPEN
OH OPEN HOLE
•
.
C~
bp
BP Exploration Alaska
Milne Point
To: Jerry Sharp/Mark O'Malley Date: September 10, 2009
MPU Well Operations Supervisor
From: Keith Lopez IOR: 60 bopd
Tract 14 PE AFE: MSGPDWLI3
Reviewed by Brad Gathman CO5T: $90M
(10/14/09)
Sub_iect: MPG-13i CTU set IBP
OBJECTIVES:
Set IBP between the OA and OB perfs to isolate the latter and cap with 15' of Sluggits. ~
PROPOSED STEPS:
Category Ste Descri tion
C 1 Drift for IBP, Set IBP @ 7173'
S 2 Dum bail 15' of Slu its on to of IBP
WELL DATA
Current Status: On water injection. 727 bwpd @ 1253 psi
M~ Deviation: 76 degrees at 3704' MD
Min ID: 2.75" at 6713', 6645', and 2289'MD (3-1/2" HES XN Nipple)
Last TD tag: 7257' MD on 6/03/09
Last downhole ops: IPROF on 6/03/09
Latest H2S level: N/A - SBL have minimal H2S <10 ppm
Latest SBHP: 2876 psi @ 4000'TVDSS 7/24/09 (10 day SBHP)
Tbg/csg size: 3.5" tbg, 7" prod liner
BACKGROUND
MPG-13 is a Schrader N/OA/OB injector supporting MPG-15. MPG-15 is currently producing
with cycles of high GOR, but the specific zone that is contributing the majority of the gas is
unknown. MPG-15 was worked over in 2006 and perfs were added in the NB sand. Perfs to
support this production were not added in the MPG-13 unti12008, so it is possible that the NB is
producing at high GOR. Additionally, the last two IPROF's have shown most of the injection
going into the OB zone.
CURRENT PLAN
• •
/
Current plan is to set an IBP between the OA and OB zones to isolate the latter. This will give us
better control over the injection volume into the N and OA sands that are thought to be under
pressured and causing the high GOR problems in the MPG-15. A pressure gauge will be hung
below the IBP to verify the pressure of the OB and the plug will be capped with 20' of Sluggits.
This change in injection conformance should result in increased on-time and decreased WC in
the MPG-15. The intent of this IBP is to be temporary and to be removed at a later date to
continue injection into the OB.
Most Recent Downhole Work
An IPROF was conducted on 6/3/09 with the initial tag at 7277' (53' of rat hole). Subsequent
runs showed that the wellbore did have some Schmoo and gave a shallower tag of 7257' (33' of
rat hole). A Schmoo-be-gone treatment was conducted on 6/8/09 to clean up any additional
Schmoo in the hole.
DETAILED PROCEDURE:
CTU
1. MIRU CTU and inspect site.
2. SI well and RIH w/ GR/CCL in carrier w/ 2.5" nozzle for drift assembly for IBP. With
well SI, continue to RIH jetting w/ 1°Io slick KCl to 7200' CTMD taking returns up the
annulus to a tank. This is to remove Schmoo from wellbore.
3. POOH and flag pipe ~ 7000' MD. Freeze protect w/ 26 bbls of 60/40 MEOH.
4. MU BHA and 2.50" IBP. Hang memory pressure gauge off bottom of IBP set for 1 hour
pressure reads (intent is to read long-term trends over a 6 month period).
5. RIH to flag and tie into Western Atlas' Segmented Bond Log dated 6/3/98. Set IBP
@ 7173' ELMD. Set IBP per Baker guidelines.
6. RDMO CTU.
SL
7. RIH & dump bail 15' of Sluggits on top of IBP @ 7173' MD.
8. RDMO and infarm Pad Operator to put the well back on injection at 500 BWPD ar
1300 psi Max WHP.
POINT5 OF CONTACT:
Tract 14 Pad Engineer:
Keith Lopez
Office:564-5718 Ce11:907-903-5432
~ •
,~ ~rr~an ~ tns^ s~V1
~;,#x,~ n~n o«~ s~
FMG Csen S, wf i 1'~t 2 7/8" FAAC tb5
hn9• 2-7i8` $rd_ toR ~d bai~orn,
2.5" CNV ~Pt/ pr~ofiMe_
28" 91_1 ppf, FWa '~12'
KOP ~ 5~0' to 3,500
Meat. hofe ar~e = 76 ~g_
h~oie angle lhrxf perfs = 11 de~.
3_5" 9_~t ppf, L~[! EUE rraod TBG
{dtiR IQ = 2$~ST, t~. = .fl087 bpf}
7" 26 ppf, L-~D, 8 I'C mc~d pKa~duc~o
t~sing
( t~t ID =£.'!51", c~F- = I7_Q383 bp
i F~S `X 1lipple ~ I
t13' taore_
~tim~n Summarv
P@11~DI'~iO~I- SIAi11if~N
ReF loa• ~T d~ted 6r3J9i8
Siae SPF I-~rua6 (7Vfl1
2-~' 0 ~22'-864Q' 49D4'~'
4_5" 5 7i094'-7130' 4238'~:
~1_S' S 7190'-7224' 4313'~4:
2_5° HSO P~-nerjet ctrarr,~es ~ so'
PFtasing
4_~ A1P~ ~ ~~ ~ ~ ~9-
P~~9
I~A P !-J G -1 ~ o""~-„g_ ~ ~ = s ~'~ t~- ~
RT To Ttx~. Spod = 30.7' (N 22E~
.5" I~S `~ Nipple ~ I
_$13" bcx~e_
Baker S-3 padce~ ~
37a' ~
5" HE5 XM l~ippie ~T13°
.873" bo~, 2_75'
~)
WLE~ ~~
2) T NABI'k,~r jls. 674T~GTb'8' ~
~ ncset ao~ar ~PBll~l 7 3'~29' I
~~~ 7'~
oiATE F~V. BY
7~-97 14~0
D6T'I SJ96 M. Lirtder
~2-11-t~8 JRP
COM~BZTS
7m t~aed Flaie ~ 22E
A~c!
M1LWE ROIMT tlNiT
YVELL No - G-13
API : 9D-A29~T82
BP EXPLaRATlON (AI~
~ ,
WELL SERVICE REPC~RT
WELL JOB SCOPE UI+~T
~ P~~'~ ~ IPRQF SWCP #02
DATE DAILY W4RN( [lAY ~URV
613I2U09 DRIFTffAG' IhJJECTION PROFILE REA
CO~T CODE PLUS KEY RERSON MIGHT SUPV/
MSGPDWL13-R SWCP-PRIDE BYRRS
MIN ID t3EPTH TTL SIZE
2.75 " 6713 FT 2.992 "
DAILY SUA~~IMMARY
'A'**COtVT. FROM VNSR 6-2-09*** {ipro@
RAN 2.70" CENT, TEL, SAMPLE BAILER, LOC TT ar 6705' SLM(20' CORR. TO 6,725' MD)
TAGGED TD ~ 7,271' MD, 53' OF RAT HOLE. RECOVERED 2 GUPS OF SCNdAQD.
ATTEMPT TO 4UE 1PROF V+tiPDS IPROF SPINNER TOOLS, UNABLE TO PASS 4,313' SLM.
RAN 2.60" CENT, 2.50" SAMPLE B~ILER, TAG TD a~7r 7,257' SLM( ~1I2 SCHM00~.
RAN PDS SPINNER IPRdF. AS PER PROG(INJ. RATE 700 & 1000 BWPD) GOOD DATA
"*"WELL LEFT INJ. PAD OP NOTIFIED"**
L(]G EN TRIES
I tut Tb IA (1A -y 1350 920
TIME COMMEPIT
00:01 CONT. FROM WSR 6-02-09 ***'~*"GURRENTLY RU, TS=10' 1-7I8" RS(2.20 tNHEELS), 1-3l4" OJ, K.JT,1-7/8"
LS S"***'~"
01:00 PT PCE V+l/ DIESEL 300H-2000H GOOD
01:15 RIH W! 3.70" GENT TEL SAMPLE BAILER LOC. TT 6 705' SLM 6725' MD
04:00 TAGGED TD 7 257' SLM 7 277' MD ...P40H
04:45 OOH REC4VERED 2 CUPS OF SCHM00.
06:00 CIO TO TAYLOR INSPECT LOC PJS~t GO OVER Jd8 SG4PE WlPDS.
06:20 PRESSURE UP LUB W/DIESEL 200 LOW! 1200 HIGH GdOD TEST.
06:34 RIH W12.70" CENT, POS IPROF SPINNER TOOLS (oal 19~. SD ~ 4,313' SLM, STEP UP INJECTION RATE,
ATTEMPT FEIN TIMES TO FALL PAST, UNABLE TO PASS THROUGH, CONTACT CO-REP, POOH TO CHECK
TOOLS.
08:27 OOH WIT04LS LITTLE TO NO SGHM00 ON TOOLS NO SOLIDS . MAKE UP DRIFT.
09:12 PRESSURE UP LUB W/DIESEL, RIH W! 2.6~" CEP1T, 2.50" SAMPLE BAILER, SL4V+tS D01n1N a~7r 4,313' SLM TO
4 900' SLM ABLE TO KEEP FALUNG TAG TD 7 257' SLM STICKY BTM POOH.
10:12 OOH W(f00LS RECOVERED ~ 1I2 GALLON OF SCHM40, RECOIUFIGURE PDS IPROF T4QLS, PLAGE KJT IN
MIDDLE OF TOOLS.
10:47 RIH W12.60" CENT, PDS IPROF SPINNER TOOLS (OAL 19~, ICJT IN THE MIDDLE OF T04L ~10' FROM BOTTaM,
TOOLS SLOWED DOWN BETV+tEEN 4 300' 4 900' SLM STEPPED RATE UP TO 1600 bw d& 1650 si .
12:25 STdP a[~7 7,247' SLM, 10' ABOVE TD. FIAG LINE ~a THAT POINT RE-ATTAGH PQS DEPTH B07f, STABiLIZE
INJEGTION RATE.
14:10 RATES STABILIZES 680 bw d& 1239 5i BEGIN LOGGING PROGRAM STOP COUNTS .
15:16 STOP COUNTS COMPLETE BEGIN DYN~tIG PASSES.
16:46 DYNAMIG PASSES COMPLETED STEP UP RATE T0100~ bw d LET STABILIZE.
17:40 CJO T~ PRIDE INSPECT LOC PJSM GO dVER PROGEDURES.
18:a0 INJ. RATE ESTABLISHED 1080 BWPD & 1243 si PERFORM STA~TIC ST4PS AS PER PRdGR~.
19:32 RIH ~60 FPM TO FLAG ~ 7,247' SLM(7,267' MD), BEGIN DYNAI~IC LOGGING PASSES AS PER
PROGRARA...POOH 150' FPM
22:09 OOH WI LOGGING TOOL STANDBY FOR QATA.
22:45 RECEIVED GO~D DATA NOTIFY REP.
22:50 BEGIN RD.
23:50 RD COMPLETE...NOTIFY PAD OP, IV4RMAL SSV, LEAVE CHOKED ~ 1000 BVNPD ~S PER PAD OP....EMD
TICKET
F ~ Tb IA OA -> 1300 920
.~oe casTs
SERVICE COII~dN1f - SER1f~E DA~Y COST CUMUL TOTAL
PDS $4 550 S10 585
SCHLUI~BERGER $870 $24 OBA
SCHLUPABERGER PLUS 15 PERCENT $5 802 S$ 305
T4TAL F~LD ESTIMATE: $11 222 $d2 954
. ' ~ ~
Measure Depth I
0 1000 2000 3000 4000 5000 6000 7000 8000
0
500
1000
1500
2000
~ 2500
~
3000
3500
4000
4500
5000
Maz Hole Angle 76 deg
C~ 3704'
MPG-13 Directional Survey
05/20/08
~~r~l~m~~r~~~~
Alaska Data & Consulting Services
2525 Gambell Street, Suite 400
Anchorage, AK 99503-2838
ATTN: Beth
Wnll _Inh It
NO. 4712
z Company: State of Alaska
~~ ~~~~ ~ ~I= Alaska Oil & Gas Cons Comm
rw ~V~
Attn: Christine Mahnken
333 West 7th Ave, Suite 100
Anchorage, AK 99501
~ n,.
MPB-04A 12021150 MEM PROD PROFILE 04/17/08 1 1
MPG-13 12021151 MEM INJECTION PROFILE C 04/18/08 1 1
Z-26A 11978454 MEM GLS aU(p-p 04/23/08 1 1
Z-29 11978453 MEM GLS - 04/22/08 1 1
Y-36 12005204 MEM GLS y 02/12/08 1 1
4-14AlS-37 12031471 _
PRODUCTION PROFILE W/FSI 04/12/08 1 1
Y-07A 11966254 SCMT / 05/02/08 1 1
02-01 B 11966257 LDL _ ~ (p 05/10/08 1 1
X-16A 11975771 USIT L .- C 05/14/08 1 1
07-26 12061688 USIT - 05/16/08 1 1
05-34 11966251 USIT - 04/13/08 1 1
OS-23A 118966257 USIT ( 05/13/08 1 1
S-33 11962596 USIT 04/15/08 1 1
V-223 12061688 CH EDIT PDC GR (USIT `~ - (~ 03/23/08 1
V-220 40016600 OH MWD/LWD EDIT ap _ 03/03/08 2 1
4-14A/S-37 40016545 OH MWD/LWD EDIT p~.-U l / 02/18/08 2 1
05-22B 11628800 MCNL 10/22/07 1 1
05-136 12021140 MCNL `~j` 01/31/08 1 1
Z-10 12066520 RST (~L 04/10/08 1 1
D-10 11975766 RST 04/25/08 1 1
~~^~~ ~~•~••v ~~~ww~ •,~.v ~~r ~ v ~ V~V~Y nYV MIYV nGl Vn1Y IIYV VIYG l.Vr') CN\.n I V:
BP Exploration (Alaska) Inc.
Petrotechnical Data Center LR2-1
900 E. Benson Blvd. " ,,
Anchorage, Alaska 99508
Date Delivered: n,, ;, `<'. :~~li~i~j
Alaska Data & Consulting Services
2525 Gambell Street, Suite 400
Anchorage, AK 99503-2838
ATTN: Beth
Received by:
•
•
~\
~~~~ STATE OF ALASKA ~ ~~
_~
"` !'~~\ ALA OIL AND GAS CONSERVATION COMMISSION
6yR~
REPORT OF SUNDRY WELL OPERATIONS
~~B ~ o zoos
1. Operations Abandon ~ Repair Well ~ Plug Perforations ~ Stimulate ~ 1S 8S Ui1S. QRNCIIS~IP1-
Performed: Alter Casing ~ Pull Tubing ~ Perforate New Pool ~ Waiver ~ Time Extensidn [~tIG~1Gfi~~Q
Change Approved Program ~ Operat. Shutdown ~ Perforate Q Re-enter Suspended Well
2. Operator BP Exploration (Alaska), Inc. 4. Current Well Class: 5. Permit to Drill Number:
Name: Development Exploratory 197-1200
3. Address: P.O. Box 196612 Stratigraphic Service ' 6. API Number:
Anchorage, AK 99519-6612 50-029-22782-00-00
7. KB Elevation (ft): 9. Well Name and Number:
58.6 KB MPG-13
8. Property Designation: 10. Field/Pool(s):
ADLO-025516 MILNE POINT UNIT Field/ SCHRADER BLUFF Pool
11. Present Well Condition Summary:
Total Depth measured 7421 ~ feet Plugs (measured) None
true vertical 4495.95- feet Junk (measured) None
Effective Depth measured 7292 feet
true vertical 4393 feet
Casing Length Size MD TVD Burst Collapse
Conductor 110' 20" 91.4# H-40 32' - 110' 32' - 110' 1490 470
Production 7404' 7" 26# L-80 31' - 7404' 31' - 4482' 7240 5410
c~iv~~ ~~~ `r ~UUU
Perforation depth: Measured depth: 6922 - 6940 ~ 7094 - 7130 7190 - 7224
True Vertical depth: 4104 - 4118 4237.87 - 4266.03 4313.11 - 4339.88 = _
Tubing: (size, grade, and measured depth) 3-1/2" 9.3# L-80 SURFACE - 6725'
0 0 -
Packers and SSSV (type and measured depth) 7" BAKER S-3 6658'
0 0
0 0
0 0
12. Stimulation or cement squeeze summary:
Intervals treated (measured): ~~~
~ C' ~
~
'
,,
_ , r t ~ ~
"~,
'~~1'
Treatment descriptions including volumes used and final pressure:
13. Representative Daily Average Production or Injection Data
Oil-Bbl Gas-Mcf Water-Bbl Casing Pressure Tubing pressure
Prior to well operation: 563 1270
Subsequent to operation: 415 1271
14. Attachments: 15. Well Class after proposed work:
Copies of Logs and Surveys Run Exploratory f '' Development ~"` ServiCe
Daily Report of Well Operations X 16. Well Status after proposed work:
OiI ! Gas ~ WAG '' GINJ (~' WINJ ~' WDSPL
17. I hereby certify that the foregoing is true and correct to the best of my knowledge. Sundry Number or N/A if C.O. Exempt:
N/A
Contact Gary Preble
Printed Name Gary Preb Title Data Management Engineer
Signature Phone 564-4944 Date 2/19/2008
Form 10-404 ~tevised 04/2006 ~-~~ ~ Submit Original Only
•
MPG-13
DESCRIPTION OF WORK COMPLETED
NRWO OPERATIONS
EVENT SUMMARY
ACTIVITYDATE ~ SUMMARY ~i
2/11/2008:`***""**WELL INJECTING UPON ARRIVAL***'`****
,INJECTION RATE OF 540 BWPD. SHUT IN WELL AT WING TO RIH.
'INITIAL T/I/O = 1300/0/0 PSI.
'API DATA FOR 2.5" HSD POWERJET GUNS, 60 DEG PHASING, 6 SPF:
;PENETRATION 25.2", ENTRANCE HOLE 0.32".
FINAL T/I/O = 1100/0/0
WELL LEFT SHUT-IN, DSO NOTIFIED
JOB COMPLETED
FLUIDS PUMPED
BBLS
1 DIESEL
WELL LOG
TRANSMITTAL
ProActive Diagnostic Services, Inc.
To:
State of Alaska AOGCC
333 W. 7th Street
Suite 700
3001 Porcupine St.
Anchorage, Alaska 99501
RE: Distribution - Final Print(s)
The technical data listed below is being submitted herewith, Please acknowledge receipt by returning a signed copy of
this transmittal letter to the attention of:
Joey Burton / Jeni Thompson
ProActive Diagnostic Services, Inc.
P. 0. Box 13S9
Stafford, TX 77497
BP Exploration(Alaska}, Inc.
Petro-Technical Data Center LR:~-I
900 East Benson Blvd.
Anchorage, Alaska 99508
LOG DIGITAL MYLAR / BLUE LINE REPORT
WELL DATE TYPE OR SEPIA PRINT(S} OR
CD-ROM FILM BLUELINE
Open Hole 1 I 1
MP G-13i 10-03-03 Res. Eval. CH 1 1 1
Mech. CH 1
Caliper Survey
Print Name:
ProActive Diagnostic Services, Inc., Po Box ! 369 Stafford Tx 77477
Phone:(281) 565-9085 Fax:(281) 565-1369 E-mail: pds~memorylog.com Website: www.memorylog.com
MEMORA :iUM
State o Alaska
Alaska Oil and Gas Conservation Commission
TO: Camille O. Taylor
Chair
THRU: Tom Maunder*"'~(,~_~
P.I. Supervisor
FROM: Jeff Jones
Petroleum Inspector
DATE: September 2, 2002
SUBJECT: Mechanical Integrity Tests
BPXA
G,'K, L Pads
G-09i, G-13i, K-21 i, L-15i
MPU
Milne Point Field
NON- CONFIDENTIAL
· Packer Depth Pretest Initial 15 Min, 30 Min. J
WellI G-09i I Typelnj. I S I T.V.D. J 3985 J Tubingl 1300
P.T.D.I 1971170ITypetestl P ITestpsil 1500 I CasingI 850 1152011505115051 P/FIPI
Notes:Pre-testpress, monitored&stable.
WellI G-13i I Typelnj. I S I T.V.D. I 3902 I TUbing 1450 I 1450 I 1450 I lntervall 4
97 200ITypetestl P 'lTestpsi
Notes: Pre-test press, monitored & stable.
WellI K-21i JTypelnj.I Si .v.D.
P.T.9.I 1961760 ITypetestl P ITestpsil 1736 I CasingI 825 1180O1178011780I P/F
I PI
Notes: Pre-test press, monitored & stable. "'"" · -
WellI L-15i Type lnj. J N I T.V:D. I 6947 I'TubingJ 4450 J 4450 I 4450 J 4450 J lntervalI 4
P.T.D.I 1940620 TypetestI P ITestpsil 1737 I CasingI zero I lS00 I 1760 I 1760 I P/F
I-"
Notes: Pre-test press, monitored & stable. ---'-
Type INJ. Fluid Codes
F = FRESH WATER INJ.
G = GAS INJ.
S = ~ -~ !.'~ '/"/ATER INJ.
N -': :, ' .~ECTING
Type Test
M= Annulus Monitoring
P= Standard Pressure Test
R= Internal Radioactive Tracer Survey
A= Temperature Anomaly Survey
D= Differential Temperature Test
Interval
I= Initial Test
4= Four Year Cycle
V= Required by Variance
W= Test during Workover
O= Other (describe in notes)
Test's Details
September 2, 2002: I traveled to BPXA's Milne Point Field t° witness 4 year MIT's on water injection wells G-09i, G-
13i, K-21i and L-15i.
Jeff Jones was the BPXA representative in charge of the tests. The pre-test pressures were monitored for 15 minutes and
the standard annulus pressure test was then performed on each well, with all fOur wells passing the MIT. I inSpected each
well house during the tests and no exceptions were noted.
Summary: I witnessed successful MIT's on BPXA's Milne Point Field injection wells G-09i, G-13i, K-21i and 1-15i.
Four well houses inspected, no exceptions noted.
M.I.T.'s performed: _4
Attachments:
Number of Failures: 0
Total Time during tests: 4.5 hrs.
cc:
,SCANNED OCT 2002
MIT repcA form
5/12/00 L.G. MIT MPU G-09i,G-13i,K-21 i,L-15i 9-2-02 JJ.xls 9/10/2002
Well Compliance Report
File on Left side of folder
197-120-0
MILNE POINT UNIT SB G-13
50- 029-22782-00
BP EXPLORATION
MD~J~'~421 zI'VD 04496 Completion Date: j6/8/98 Completed Status: 1WINJ Current:
Name Interval Sent Received T/C/D
D 8116 ~ SPERRY MPT/GR/EWR4 OH 9/17/97 9/17/97
D 8735 ~~ SPERRY MPT/GR/EWR4 OH 11/18/98 11/18/98
L DGR/EWR4-MD - &'~AL 4532-7421 OH 9/17/97 9/17/97
L DGR/EWR4-TVD ~e~AL 2953-4496 OH 9/17/97 9/17/97
L GR/CCL-PERF FCJ:NAL 7250-7290 CH 5 6/12/98 6/15/98
L 1NJP-SPIN/TEM/ ,~AL PRES 7040-7280 CH 5 8/18/98 8/20/98
L SBT F~ 4963-7286 CH 5 6/12/98 6/15/98
R MWD SRVY ~PEI~(Y 0-7421. OH 8/3/98 8/5/98
T 8612 ~ SCHLUM PCD CH 8/12/98 8/20/98
Daily Well Ops ?/~ ~/]~ -- F~//6°/?) Are Dry Ditch Samples Required? yes ~ _ And Receive~-
Was the well cored? yes ,_.~._. Analysis Description Re~ yes no Sample ~ ....
Comments:
Tuesday, May 30, 2000
Page I of l
0 !:! I I--I_1 ~ G S ~: F:I~JI C Ec:
To:
WELL LOG TRANSMITTAL
State of Alaska
Alaska Oil and Gas Conservation Comm.
Atm.: Loft Taylor
3001 Porcupine Dr.
Anchorage, Alaska 99501
MWD Formation Evaluation Logs - MPG- 13,
AK-MM-70204
November 25, 1998
MPG-13:
2" x 5"MD Resistivity and Gamma Ray Logs:
50-029-22782-00
2"x 5" TVD Resistivity and Gamma Ray Logs:
50-029-22782-00
1 Blueline
1 Folded Sepia
1 Blueline
1 Folded Sepia
PLEASE ACKNOWLEDGE RECEIPT BY SIGNING AND RETURNING THE ATTACHED COPIES
OF THE TRANSMITFAL LETTER TO THE ATFENTION OF:
Sperry-Sun Drilling Services
Attn: Ali Turker
5631 Silverado Way, Suite G.
Anchorage, Alaska 99518
.t
BP Exploration (Alaska) Inc.
Petro-technical Data Center, MB3-3
900 E. Benson Blvd.
Anchorage, Alaska 99519-6612
THIS REPLACES ALL PREVIOUS DATA
DATE:
5631 Silverado Way, Suite G · Anchorage, Alaska 99518 · (907) 273-3500 · Fax (907) 273-3535
A Halliburton Company
r'l I~ I ti__ I IM I~ SI::R~I I-- E S
To:
WELL LOG TRANSMITTAL
State of Alaska
Alaska Oil and Gas Conservation Comm.
Atm.: Loft Taylor
3001 Porcupine Dr.
Anchorage, Alaska 99501
MWD Formation Evaluation Logs
November 18, 1998
'
MPG-13, AK-MM-70204
1 LDWG formatted Disc with verification listing.
API#: 50-029-22782-00
PLEASE ACKNOWLEDGE RECEIPT BY SIGNING AND RETURNING TIlE ATrACltED COPIES
OF ~ TRANSMITTAL LETTER TO ~ ATrENTION OF:
Sperry-Sun Drilling Services
Atto: Ali Turker
5631 Silverado Way, Suite G.
Anchorage, Alaska 99518
BP Exploration (Alaska) Inc.
Petro-technical Data Center, MB3-3
900 E. Benson Blvd.
Anchorage, Alaska 99519-6612
R, EPROCESSED
THIS ~EPLACES ALL P!tEVtOU5 DATA
DATE:
5631 Silverado Way, Suite G · Anchorage, Alaska 99518 · (907) 273-3500 · Fax (907) 273-3535
A Halliburton Company
GeoQuest
500 W. International Airport Road
Anchorage, AK 99518-1199
ATTN: Sherrle
NO. 11438
Company:
Field:
Alaska Oil & Gas Cons Comm
Attn: 'Lorl Taylor
3001 Porcupine Drive
Anchorage, AK 99501
MIIne Point (Cased Hole)
8/18/98
Well Job # Log Description. Date BL RF Sepia LIS Tape
, ,
MPU F-62 L~.~ (--- " INJECTIONPRORLE '980706 I 1
i ,
MPG-13 INJECTION PROFILE 980718 I 1
, ,,
MPH-09 STATIC TEMPERATURE SURVEy 980 719 ! 1
MPH-09 . STATIC TEMPERATURE SURVEY 9 80 719 1 1
MPH-09 STATIC TEMPERATURE SURVEY 9 80 719 I 1
MPH-09 CEMENT MAP LOG 980720 1 . 1
MPJ-22 4 ARM CALIPER 980719 1 1
,
,
PLEASE ACKNOWLEDGE RECEIPT BY SIGNING AND RETURNING ONE COPY EACH TO:
BP Exploration (Alaska) Inc.
Petrotectnical Data Center MB3-3
900 E. Benson Blvd.
Anchorage, Alaska 99519-6612
Date Delivered:
RECEIVED
AUG 20 1998
Alaska Oii & Gas Cons. Commission
,~n~hnr~n~.
Schlumberger GeoQuest
500 W. International Airport Road
Anchorage, Alaska 99618-1199
/
GeoQuest
500 W. International Airport Road
Anchorage, AK 99518-1199
ATTN: Sherrle
NO. 11424
Company:
Field:
Alaska Oil & Gas Cons Comm
Attn: Lori Taylor
3001 Porcupine Drive
Anchorage, AK 99501
Milne Point (Cased Hole)
Well Job # Log Description Date BL RF Sepia LIS Tape
C~P'I~O MPG-13 ~J~ i~(eJ~2,: 98396 SBT(PDC) ' 980603 ,. ~ " !
MPJ-20 .,,,r ::?/',.,},"z.~ 98401 GR/CCL (PDC) 980703 I
8/12/98
PLEASE ACKNOWLEDGE RECEIPT BY SIGNING AND RETURNING ONE COPY EACH TO:
BP Exploration (Alaska) Inc.
Petrotectnical Data Center MB3-3
900 E. Benson Blvd.
Anchorage, Alaska 99519-6612
Date Delivered:
RECEIVED
AUG 2 0 1998
Alaska Oil & Gas Cons. Commission
Am~,nmn~
Schlumberger GeoQuest
500 W. International Airport Road
Anchorage, Alaska 99618-1199
STATE OF ALASKA
ALASKA OIL AND GAS CONSERVATION COMMISSION
WELL COMPLETION OR RECOMPLETION REPORT AND LOG
1. Status of Well Classification of Service Well
[] Oil [] Gas []Suspended []Abandoned [] Service Water Injection
2. Name of Operator 7. Permit Number
BP Exploration (Alaska)Inc. 97-120
3. Address 8. APl Number
P.O. Box 196612, Anchorage, Alaska 99519-6612 50-029-22782
4. Location of well at surface ~- ....... 9. Unit or Lease Name
1956' NSL, 3439' WEL, SEC. 27, T13N, R10E, UM ~ ........ ~,~ ~i~'~¢; ~ ~~ Milne Point Unit
At top of productive interval ~ ..~ ~r~'"-"T~./ iI 10. Well Number
1470' NSL, 2756' WEL, SEC._ 22, T13N, R10E, UM ~/ ~_~ ~ .,~~~ . MPG-13
At total depth 11 Field and Pool
1666' NSL, 2718' WEL, SEC. 22, T13N, R10E, UM
~'- ..... :. ?-v Milne Point Unit / Schrader Bluff
5. Elevation in feet (indicate KB, DF, etc.) ~6. Lease Designation and Serial No.
KBE = 58.60'~ ADL 025516
12. Date~¢~~Spudded , ,~13. Date T.D. Reached ~ 14. Date Comp., Susp., or Aband.]~ 15. Water depth, if offshore ~16. No. of Completions
~ ~/~ 6/8/98 N/A MSLI One
17. Total Depth (MD+~D) ~18. Plug Back Depth (MD+~D)119. Directional Su~ey [20. Depth where SSSV set ~21. Thickness of Permafrost
7421 4496 FT~ 7292 4393 FT~ ~Yes ~No~ N/A MD ~ 1800' (Approx.)
22. Type Electric or Other Logs Run
MWD, LWD, GR/CCL 0RIGIRI.A',
23. CASING¢ LINER AND CEMENTING RECORD
CASING SE~ING OEPTH HOLE
SIZE WT. PER FT. G~DE TOP BOSOM SIZE CEMENTING RECORD AMOUNT PULLED
20" 91.4¢ H-40 32' 110' 24" 250 SX Arcticset I (Approx.)
7" 26~ L-80 31' 7404' 8-1/2" 1209 sx PF 'E', 130 sx Class 'G' ~'~
24. Perforations open to Production (MD+~D of Top and 25. TUBING RECORD Alaska 0il & Gas Cons.
Bottom and inte~al, size and numbe0 S~ZE DEPTH SET (MD) PACKER ~~ge
4-1/2" Gun Diameter, 5 spf 3-1/2", 9.3¢, L-80 6725' 6658'
MD ~D MD ~D
7094'-7130' 4238'-4266'
7190'-7224' 4313'-4340' 26. AC~D, FRACTURE, CEMENT SQUEEZE, ETC.
DEPTH INTERVAL (MD) AMOUNT & KIND OF MATERIAL USED
Freeze protect with 100 bbls diesel
7292' Cement retainer set
7302'-7305' 20 bbls remedial 'G' cement, sqzd to 3500 ps~
27. PRODUCTION TEST
Date First Production IMethod of Operation (Flowing, gas li~, etc.)
June 20, 1998 ! Water Injection
Date of Test Hours Tested PRODUCTION FOR OIL-BBL GAS-MCF WATER-BBL CHOKE S~ZE IGAS-O~L RATIO
TEST PERIOD
I
Flow Tubing Casing Pressure ;CALCU~TED OIL-BBL GAS-MCF WATER-BBL OIL GRAVIs-APl (CORR)
Press. 24-HOUR RATE
28. CORE DATA
Brief description of lithology, porosity, fractures, apparent dips and presence of oil, gas or water. Submit Core chips.
Form 10-407 Rev. 07-01-80 Submit In Duplicate
29. Geologic Markers 30. Formation Tests
Measured True Vertical Include interval tested, pressure data, all fluids
Marker Name Depth Depth recovered and gravity, GOR, and time of each phase.
TSBD 7096' 4239'
TSBC 7146' 4278'
TSBB 7186' 4310'
31. List of Attachments
Summary of Daily Drilling Reports, Surveys
i32. I hereby certify th~oregoing~.~-~ ..-,- is.s.s.s.s.s.s.s.s.s~~d correct to the best of my knowledge
/
Signed
'~'~"~ '//' "T~, e.~~J~~ Title Drilling] Engineerin~ Supervisor Date ¢~'/.,t
MPG-13 97-120 Prepared By Name/Number: Kathy Campoamor, 564-5122
Well Number Permit No. /Approval No.
INSTRUCTIONS
GENERAL: This form is designed for submitting a complete and correct well completion report and log on all types of lands and
leases in Alaska.
ITEM 1: Classification of Service Wells: Gas injection, water injection, steam injection, air injection, salt water disposal, water
supply for injection, observation, injection for in-situ combustion.
ITEM 5: Indicate which elevation is used as reference (where not otherwise shown) for depth measurements given in other spaces
on this form and in any attachments.
ITEM 16 AND 24: If this well is completed for separate production from more than one interval (multiple completion), so state in item
16, and in item 24 show the producing intervals for only the interval reported in item 27. Submit a separate form for each additional
interval to be separately produced, showing the data pertinent to such interval.
ITEM 21: Indicate whether from ground level (GL) or other elevation (DF, KB, etc.).
ITEM 23: Attached supplemental records for this well should show the details of any multiple stage cementing and the location of
the cementing tool.
ITEM 27: Method of Operation: Flowing, Gas Lift, Rod Pump, Hydraulic Pump, Submersible, Water Injection, Gas Injection, Shut-In,
Other-explain.
ITEM 28: If no cores taken, indicate 'none'.
Form 10-407 Rev. 07-01-80
Facility
M Pt G Pad
Progress Report
Well MPG- 13
Rig
Page
Date
1
03 August 98
Date/Time
13 Jul 97
14 Jul 97
15 Jul 97
16 Jul 97
17 Jul 97
18 Jul 97
01:01-02:00
02:00-05:00
05:00-06:00
06:00-13:30
13:30-17:00
17:00-21:00
21:00-00:00
00:00-02:00
02:00-03:30
03:30-04:00
04:00-06:00
06:00-06:45
06:45-07:00
07:00-03:00
03:00-04:00
04:00-05:00
05:00-05:30
05:30-06:00
06:00-12:30
12:30-13:30
13:30-13:45
13:45-14:15
14:15-14:30
14:30-15:00
15:00-00:00
00:00-01:00
01:00-03:00
03:00-04:00
04:00-06:00
06:00-06:30
06:30-07:30
07:30-08:30
08:30-10:00
10:00-18:00
18:00-18:30
18:30-20:00
20:00-21:00
21:00-21:30
21:30-23:00
23:00-06:00
06:00-10:00
10:00-11:30
11:30-12:30
12:30-20:30
20:30-21:30
21:30-00:00
00:00-01:00
01:00-03:30
03:30-06:00
06:00-06:30
06:30-10:00
10:00-11:30
11:30-13:00
13:00-20:30
Duration
3/4 hr
3hr
lhr
7-1/2 hr
3-1/2 hr
4hr
3hr
2hr
1-1/2 hr
1/2 hr
2hr
3/4 hr
1/4 hr
20 hr
lhr
lhr
1/2 hr
1/2 hr
6-1/2 hr
lhr
1/4 hr
1/2 hr
1/4 hr
1/2 hr
9hr
lhr
2hr
lhr
2hr
1/2 hr
lhr
lhr
1-1/2 hr
8hr
1/2 hr
1-1/2 hr
lhr
1/2 hr
1-1/2 hr
7hr
4hr
1-1/2 hr
lhr
8hr
lhr
2-1/2 hr
lhr
2-1/2 hr
2-1/2 hr
1/2hr
3-1/2 hr
1-1/2 hr
1-1/2 hr
7-1/2 hr
Activity
Rig moved 30.00 %
Rig moved 30.00 %
Rig moved 30.00 %
Rig moved 100.00 %
Rigged up Divertor
Removed Divertor
Installed Divertor
Made up BHA no. 1
Installed Divertor
Functioned Divertor
Made up BHA no. 1
Circulated at 110.0 ft
Held safety meeting
Drilled to 2296.0 ft
Circulated at 2296.0 ft
Pulled out of hole to 728.0 ft
Serviced Top drive
R.I.H. to 2296.0 ft
Drilled to 3219.0 ft
Circulated at 3219.0 ft
Pulled out of hole to 2941.0 ft
Backreamed to 2480.0 ft
Pulled out of hole to 1837.0 ft
R.I.H. to 3219.0 ft
Drilled to 4535.0 ft
Circulated at 4535.0 ft
Pulled out of hole to 730.0 ft
Pulled BHA
Made up BI-LA no. 2
R.I.H. to 1700.0 ft
Serviced Block line
Serviced Top drive
R.I.H. to 4535.0 ft
Drilled to 5593.0 ft
Circulated at 5593.0 ft
Pulled out of hole to 4440.0 ft
Circulated at 4446.0 ft
R.I.H. to 4700.0 ft
Washed to 5593.0 ft
Drilled to 6355.0 ft
Drilled to 6833.0 ft
Circulated at 6833.0 ft
Pulled out of hole to 5401.0 ft
Drilled to 7421.0 ft
Circulated at 7421.0 ft
Pulled out of hole to 1700.0 ft
Serviced Top drive
R.I.H. to 7421.0 ft
Circulated at 7421.0 ft
Circulated at 7421.0 ft
Pulled out of hole to 700.0 ft
Pulled BHA
Removed Drillstring handling equipment
Ran Casing to 7402.0 ft (7in OD)
Facility
M Pt G Pad
Progress Report
Well MPG- 13
Rig (~M+)/~/&~or$ ~-~
Page
Date
2
03 August 98
Date/Time
19 Jul 97
20:30-23:00
23:00-01:00
01:00-02:00
02:00-04:30
04:30-06:00
06:00-07:00
07:00-08:00
08:00-09:30
09:30-11:00
11:00-14:30
14:30-15:00
15:00-03:00
Duration
2-1/2 hr
2hr
lhr
2-1/2 hr
1-1/2 hr
lhr
lhr
1-1/2 hr
1-1/2 hr
3-1/2 hr
1/2 hr
12hr
Activity
Circulated at 7402.0 ft
Mixed and pumped slurry - 186.000 bbl
Functioned Other sub-surface equipment
Circulated at 2105.0 ft
Mixed and pumped slurry - 450.000 bbl
Displaced slurry - 80.000 bbl
Circulated at 0.0 ft
Rigged down Casing handling equipment
Rigged down Divertor
Installed Casing on landing string
Installed Accessories
Rig moved 100.00 %
Progress Report
Facility M Pt G Pad
Well MPG-13 Page 1
Rig ~/Vt-~ Date 03 August 98
Date/Time
01 Jun 98
02 Jun 98
06:00-15:00
06:00-10:00
10:00
10:00-12:00
12:00
12:00-15:00
15:00
15:00-16:30
15:00-16:00
16:00
16:00-16:30
16:30
16:30-20:30
16:30-17:30
17:30
17:30-18:00
18:00
18:00-20:30
20:30
20:30-22:30
20:30-22:30
22:30
22:30-23:30
22:30-23:30
23:30
23:30-06:00
23:30-01:00
01:00
01:00-02:00
02:00
02:00-05:00
05:00
05:00-06:00
06:00
06:00-19:30
06:00-08:00
08:00
08:00-18:00
18:00
18:00-19:30
19:30
19:30-02:00
Duration
9hr
4hr
2hr
3hr
1-1/2 hr
lhr
1/2 hr
4hr
lhr
1/2 hr
2-1/2 hr
2hr
2hr
lhr
lhr
6-1/2 hr
1-1/2 hr
lhr
3hr
lhr
13-1/2 hr
2hr
10hr
1-1/2 hr
6-1/2 hr
Activity
Move rig
Rig moved 100.00 %
At well location - Slot
Rigged up Draw works
Equipment work completed
Accept Rig at 12:00 hrs LMH.
Rigged up Draw works
Stopped: To hold safety meeting
PJSM
Wellhead work
Installed Hanger plug
Stopped: To hold safety meeting
PJSM.
Removed Xmas tree
Equipment work completed
Nipple up All rams
Rigged up All rams
Stopped: To service drilling equipment
Repair air line. 1 hr downtime.
Rigged up All rams
Stopped: To hold safety meeting
Crew change. ISO 14001 training with both crews.
Rigged up All rams
Equipment work completed
Test well control equipment
Tested All rams
Pressure test completed successfully - 5000.000 psi
Tested BOPs to 250/5000 psi. Tested Hydrill
250/3000 psi.
Wellhead work
Retrieved Hanger plug
Equipment work completed
Run Drillpipe, 3-1/2in O.D.
Singled in drill pipe to 0.0 ft
Stopped: To hold safety meeting
PJSM.
Singled in drill pipe to 190.0 ft
6 joints picked up
Drill collars.
Singled in drill pipe to 2100.0 ft
Stopped: To circulate
Circulated at 2100.0 ft
Stopped: To hold safety meeting
Crew change.
Run Drillpipe, 3-1/2in O.D. (cont...)
Singled in drill pipe to 2100.0 ft
At Top of cement: 2105.0 ft
Tag ES Cementer
Singled in drill pipe to 6700.0 ft
Stopped: To hold safety meeting
Crew change.
Singled in drill pipe to 7315.0 ft
On bottom
Pull Drillpipe, 3-1/2in O.D.
Facility
M Pt G Pad
Progress Report
Well MPG-13 Page 2
Rig ,~m~t~,A/- .-~,5 Date 03 August 98
Date/Time
03 Jun 98
04 Jun 98
19:30-20:30
20:30
20:30-21:30
21:30
21:30-02:00
02:00
02:00-06:00
02:00-04:00
04:00
04:00-04:30
04:30
04:30-06:00
06:00
06:00-10:00
06:00-07:00
07:00
07:00-07:30
07:30
07:30-09:30
09:30
09:30-10:00
10:00
10:00-15:00
10:00-15:00
15:00
15:00-06:00
15:00-18:00
18:00
18:00-21:00
21:00
21:00-00:00
00:00
00:00-06:00
06:00
06:00-08:30
06:00-08:30
08:30
08:30-14:30
08:30-13:30
13:30
13:30-14:30
14:30
14:30-21:30
14:30-18:00
18:00
Duration
lhr
lhr
4-1/2 hr
4hr
2hr
1/2 hr
1-1/2 hr
4hr
lhr
1/2 hr
2hr
1/2 hr
5hr
5hr
15hr
3hr
3hr
3hr
6hr
2-1/2 hr
2-1/2 hr
6hr
5hr
lhr
7hr
3-1/2 hr
Activity
Laid down 34.0 ft of 3-1/2in OD drill pipe
Stopped: To pressure test
Casing test failed.
Reverse circulated at 7281.0 ft
Stopped · To hold safety meeting
PJSM.
Pulled Drillpipe in stands to 0.0 ft
At Surface: 0.0 ft
Run Drillpipe, 3-1/2in O.D.
Ran Drillpipe in stands to 2149.0 ft
Stopped: To test equipment
Tested Casing - Via string
Suspended pressure test on Casing, observed leak
Ran Drillpipe to 2149.0 ft (3-l/2in OD)
Stopped · To hold safety meeting
Crew change.
Run Drillpipe, 3-1/2in O.D. (cont...)
Ran Dfillpipe to 5072.0 ft (3-1/2in OD)
Stopped: To pressure test
Tested Casing - Via annulus
Pressure test completed successfully - 3000.000 psi
Ran Drillpipe in stands to 7301.0 ft
Stopped: To pressure test
Tested Casing - Via annulus and string
Pressure test completed successfully - 3200.000 psi
Casing tests good. Casing shoe has broken down
(able to pump out the end).
Pull Drillpipe, 3-1/2in O.D.
Pulled Drillpipe in stands to 0.0 ft
Stopped: To hold safety meeting
Electric wireline work
Conducted electric cable operations
On bottom
Start logging. Rig crew change.
Conducted electric cable operations
Completed logging run with GR/CCL from 7300.0 ft to 5000.0 ft
Conducted electric cable operations
Completed run with Gun assembly from 7305.0 ft to 7302.0 ft
Conducted electric cable operations
Completed misrun with Other sub-surface equipment to 7292.0 ft
Crew change (Rig).
Electric wireline work (cont...)
Conducted electric cable operations
Completed run with Cement retainer from 0.0 ft to 7292.0 ft
Run Drillpipe, 3-1/2in O.D.
Ran Drillpipe in stands to 7292.0 ft
Stopped: To circulate
Reverse circulated at 7292.0 ft
Stopped: To hold safety meeting
PJSM.
Cement: Squeeze
Rigged up Cement unit
Stopped: To hold safety meeting
Crew change.
Facility
M Pt G Pad
Progress Report
Well MPG-13 Page 3
Rig 4mfl~/~/-~5~ Date 03 August 98
Date/Time
05 Jun 98
06 Jun 98
18:00-19:00
19:00
19:00-21:00
21:00
21:00-21:30
21:30
21:30-04:00
21:30-04:00
04:00
04:00-06:00
04:00-06:00
06:00
06:00-08:30
06:00-08:30
08:30
08:30-03:00
08:30-15:00
15:00
15:00-18:00
18:00
18:00-03:00
03:00
03:00-06:00
03:00-06:00
06:00
06:00-09:00
06:00-09:00
09:00
09:00-15:30
09:00-12:00
12:00
12:00-15:30
15:30
15:30-23:00
15:30-18:00
18:00
18:00-23:00
23:00
23:00-06:00
23:00-02:00
Duration
lhr
2hr
6-1/2 hr
6-1/2 hr
2hr
2hr
2-1/2 hr
2-1/2 hr
18-1/2 hr
6-1/2 hr
3hr
9hr
3hr
3hr
3hr
3hr
6-1/2 hr
3hr
3-1/2 hr
7-1/2 hr
2-1/2 hr
5hr
7hr
3hr
Activity
Rigged up Cement unit
Equipment work completed
Batch mixed slurry - 20.000 bbl
Completed operations
Final rate and pressure: 1 bpm/1480 psi. Shoe and
squeeze perfs cemented.
Tested Casing
Pressure test completed successfully - 3500.000 psi
Fluid system
Fill pits with Brine
Completed operations
Pull Drillpipe, 3-1/2in O.D.
Pulled Drillpipe in stands to 4650.0 ft
Stopped: To hold safety meeting
Crew change.
Pull Drillpipe, 3-1/2in O.D. (cont...)
Pulled Drillpipe in stands to 0.0 ft
At Surface: 0.0 ft
Service Rig.
Electric wireline work
Conducted electric cable operations
Began precautionary measures
Conducted electric cable operations
Began precautionary measures
Crew change.
Conducted electric cable operations
Completed run with Gun assembly from 0.0 ft to 7290.0
PBTD 7290-ft elmd. Gun size 4 1/2" Alpha Jet-32.0
grn charges. 5 svf. 60 deg phased. Ramd,on
orientation. ~°~i-? '07 /.'~-, ~, '717,:? - ',:.'~." :-
Run Drillpipe, 3-1/2in O.D. '.."
Ran Drillpipe in stands to 3500.0 ft
Stopped: To hold safety meeting
Crew change.
Run Drillpipe, 3-1/2in O.D. (cont...)
Ran Drillpipe in stands to 7290.0 ft
Stopped: To circulate
Fluid system
Reverse circulated at 7290.0 ft
Stopped: To flowcheck well
Monitior well. Slight flow. Shut in well. DP
pressure 10 lbs.
Circulated at 7290.0 ft
Stopped: To flowcheck well
Monitor well for 15 min. Well dead.
Pull Drillpipe, 3-1/2in O.D.
Laid down 1875.0 ft of 3-1/2in OD drill pipe
Stopped: To hold safety meeting
Crew change.
Laid down 5415.0 ft of 3-1/2in OD drill pipe
Stopped: To hold safety meeting
Prepare to pick-up completion. PJSM.
Run Single completion, 3-1/2in O.D.
Ran Tubing to 0.0 ft (3-1/2in OD)
Facility
M Pt G Pad
Progress Report
Well MPG-13 Page 4
.~m~F)~/V/--.~ Date 03 August 98
Rig
Date/Time
07 Jun 98
08 Jun 98
02:00
02:00-02:30
02:30
02:30-06:00
06:00
06:00-11:30
06:00-11:30
11:30
11:30-13:00
11:30-12:30
12:30
12:30-13:00
13:00
13:00-15:00
13:00-15:00
15:00
15:00-18:00
15:00-16:30
16:30
16:30-17:00
17:00
17:00-18:00
18:00
18:00-22:00
18:00-19:00
19:00
19:00-22:00
22:00
22:00-00:00
22:00-00:00
00:00
00:00-01:00
00:00-01:00
Duration
1/2 hr
3-1/2 hr
5-1/2 hr
5-1/2 hr
1-1/2 hr
lhr
1/2 hr
2hr
2hr
3hr
1-1/2 hr
1/2 hr
lhr
4hr
lhr
3hr
2hr
2hr
lhr
lhr
Activity
Stopped · To pick up/lay out tubulars
Ran Tubing to 0.0 ft (3-1/2in OD)
Stopped · To pick up/lay out tubulars
Ran Tubing to 2800.0 ft (3-1/2in OD)
Stopped · To hold safety meeting
Crew change.
Run Single completion, 3-1/2in O.D. (cont...)
Ran Tubing to 6725.0 ft (3-1/2in OD)
Crew change and safety meeting.Finish running in
hole with completion.
Completed run with Hydraulic packer to 6657.0 ft
Wellhead work
Installed Tubing hanger
Make up tubing hanger. Pick up landing jt. LAnd
tubing hanger. Lay down tubing hanger. RILDS.
Equipment work completed
Installed Hanger plug
Install and test TWC.
Equipment work completed
Nipple down All rams
Removed BOP stack
Nipple down BOPs.
Equipment work completed
Wellhead work
Installed Xmas tree
Nipple up tree.
Equipment work completed
Tested Xmas tree
Test tubing hanger and tree. Good test.
Pressure test completed successfully - 5000.000 psi
Removed Hanger plug
Rig up lubricator and pull TWC.
Equipment work completed
Crew change.
Fluid system
Circulated at 6725.0 ft
Crew change and safety meeting. Rig up HB&R. PT
lines to 4500 psi. Good.
Stopped · To circulate
Freeze protect well - 100.000 bbl of Diesel
HB&R pumped diesel followed by inhibited brine
followed by diesel.
Stopped · To pressure test
Run Single completion, 3-1/2in O.D.
Installed Permanent packer
Shut down pumping. Drop ball. Wait on ball to go on
seat. Pressure up on tubing to 3500 psi and set
packer/test tubing. Pressure up on casing to test
casing. Good test. Rig down HB&R.
Equipment work completed
Packer set and tested. Casing tested. State waived
right to witness test.
Wellhead work
Installed Hanger plug
Facility
M Pt G Pad
Progress Report
Well MPG-13 Page 5
Rig ~/V/~- 5~ Date 03 August 98
Date/Time
01:00
01:00-06:00
01:00-06:00
06:00
Duration
5hr
5hr
Activity lubricator. Blow down lines. Secure cellar. Finish cleaning
Equipment work completed
Released Rig at 01:00 hrs LMH
Move rig
Rig moved 75.00 %
Rig down and move to K Pad.
Rig off station
1
30
OPERATOR:
F715.. E COPy
/~, 1./,,/.~ /
STATEf'~ALASKA
ALASKA OIL AND GAS C~SERVATION coMMISSION
Mechanical Integrity Test
,.
DATE:
COMMENTS:
COMMENTS:
c~-~3',
COMMENTS:
COMMENTS:
,
I I
'TUBING INJECTION FLUID:
P = PRODUCED WATER INJ.
S = SALT WATER INJ
M = MISCIBLE INJ.
I = INJECTION
N = NOT INJECTING
ANNULAR: FLUID: GRADIENT: WELL TEST:
DIESEL G. ~"t' ~" Initial
GLYCOL 4 - Year
SALT WATER Workover
DRILLING MUD ~ Other
OTHER O- ~' '7,_~ t~ ~., 'OJ ~- Cc~, I ~ .)
Distribution:
odg - Well File
c - Operator
c - Database
c - Trip Rpt File
c - Inspector
AOGCC REP SIGNATURE
OPERATOR REP SIGNATURE
MITr"'M-XLT FI-0.5 1 tOev. 3~93)
SPE, ;-SUN DRILLING SERVICES
ANCHORAGE ALASKA
BP EXPLORATION
MILNE POINT / MPG-13
500292278300
NORTH SLOPE BOROUGH
COMPUTATION DATE: 7/28/97
DATE OF SURVEY: 071797
MWD SURVEY
JOB NUMBER: AK-MM-70204
KELLY BUSHING ELEV. = 58.60 FT.
OPERATOR: BP EXPLORATION
TRUE SUB-SEA
MEASD VERTICAL VERTICAL
DEPTH DEPTH DEPTH
COURS
INCLN
DG MN
COURSE DLS TOTAL
DIRECTION RECTANGULAR COORDINATES
DEGREES DG/100 NORTH/SOUTH EAST/WEST
VERT.
SECT.
.00 .00 -58.60
112.00 112.00 53.40
202.00 202.00 143.40
290.44 290.43 231.83
384.11 384.10 325.50
0 0
0 0
0 40
0 14
0 20
N .00 E .00 .00N .00E
N .00 E .00 .00N .00E
S 29.29 W .74 .46S .26W
S 89.43 W .67 .91S .70W
N .56.E .45 .64S .89W
.00
.00
- .49
-1.00
-.76
473.92 473.91 415.31
565.95 565.90 507.30
658.08 657.92 599.32
751.40 751.00 692.40
844.06 843.19 784.59
0 55
2 7
3 17
4 46
6 37
N 33.17 E .75 .24N .49W
N 31.42 E 1.29 2.32N .81E
N 28.67 E 1.29 6.10N 2.97E
N 19.26 E 1.73 12.13N 5.54E
N 9.46 E 2.24 21.04N 7.69E
.17
2.41
6.46
12.79
21.92
935.56 933.83 875.23
1028.28 1025.08 966.48
1119.58 1114.13 1055.53
1211.31 1202.83 1144.23
1301.03 1288.81 1230.21
8 53
11 30
13 51
15 39
17 29
N 11.70 E 2.51 33.17N 9.99E
N 6.48 E 2.98 49.39N 12.49E
N 5.61 E 2.58 69.32N 14.59E
N 7.35 E 2.02 92.54N 17.25E
N 7.47 E 2.04 117.92N 20.55E
34.26
50.67
70.70
94.05
119.64
1393.67 1376.05 1317.45
1486.64 1461.19 1402.59
1579.04 1544.41 1485.81
1672.51 1627.92 1569.32
1765.36 1709.31 1650.71
21 45
25 34
25 57
27 23
30 7
N 8.29 E 4.61 148.72N 24.84E
N 8.31 E 4.11 185.63N 30.22E
N 7.41 E .59 225.41N 35.71E
N 7.30 E 1.54 267.01N 41.08E
N 8.15 E 2.98 311.27N 47.10E
150.74
188.04
228.20
270.14
314.81
1857.83 1787.86 1729.26
1949.01 1862.48 1803.88
2040.98 1936.14 1877.54
2132.24 2007.97 1949.37
2223.58 2077.24 2018.64
33
36
36
39
42
32
34
59
9
12
N 10.25 E 3.89 359.41N 54.94E
N 11.26 E 3.38 410.86N 64.73E
N 10.36 E .74 464.96N 75.06E
N 10.47 E 2.37 520.29N 85.'23E
N 9.44 E 3.42 578.92N 95.50E
363.57
415.89
470.91
527.13
586.63
2316.49 2143.62 2085.02
2408.40 2205.41 2146.81
2501.30 2263.87 2205.27
2591.88 2315.87 2257.27
2684.58 2364.60 2306.00
46 34
48 54
53 4
56 51
59 42
N 7.30 E 4.98 643.21N 104.91E
N 6.74 E 2.57 710.71N 113.22E
N 6.46 E 4.48 782.40N 121.51E
N 8.14 E 4.45 855.95N 130.96E
N 6.13 E 3.58 934.18N 140.73E
651.60
719.60
791.74
865.88
944.70
2777.32 2408.70 2350.10
2869.09 2447.86 2389.26
2962.44 2483.79 2425.19
3055.40 2516.90 2458.30
3146.04 2548.16 2489.56
63 30
65 57
68 46
69 29
70 10
N 7.19 E 4.23 1015.19N 150.20E
N 8.34 E 2.90 1097.42N 161.42E
N 8.89 E 3.06 1182.59N 174.33E
N 9.09 E .80 1268.39N 187.90E
N 10.31 E 1.47 1352.24N 202.24E
1026.24
1109.22
1195.37
1282.22
1367.27
ORIGINAL
Alaska Oil & Gas 6ons. Cornmissiun
Anchorage
SPA. f-SUN DRILLING SERVICES
ANCHOR_AGE ALASKA
PAGE
BP EXPLORATION
MILNE POINT / MPG-13
500292278300
NORTH SLOPE BOROUGH
COMPUTATION DATE: 7/28/97
DATE OF SURVEY: 071797
MWD SURVEY
JOB NUMBER: AK-MM-70204
KELLY BUSHING ELEV. = 58.60
OPERATOR: BP EXPLORATION
FT.
TRUE SUB-SEA
MEASD VERTICAL VERTICAL
DEPTH DEPTH DEPTH
COURS
INCLN
DG MN
COURSE DLS TOTAL
DIRECTION RECTANGULAR COORDINATES
DEGREES DG/100 NORTH/SOUTH EAST/WEST
VERT.
SECT.
3239.05 2580.97 2522.37
3331.72 2614.92 2556.32
3425.97 2647.31 2588.71
3517.99 2674.68 2616.08
3610.11 2698.80 2640.20
68 30
68 30
71 16
74 6
75 32
N 11.99 E 2.46 1437.61N 219.06E
N 11.03 E .96 1522.10N 236.26E
N 10.25 E 3.04 1609.08N 252.60E
N 8.37 E 3.64 1695.77N 266.80E
N 7.52 E 1.79 1783.81N 279.08E
1454.16
1540.24
1628.66
1716.49
1805.38
3703.58 2721.65 2663.05
3797.19 2745.72 2687.12
3889.39 2772.24 2713.64
3984.35 2801.96 2743.36
4079.65 2830.65 2772.05
76 9
74 1
72 31
71 0
73 56
N 8.12 E .91 1873.60N 291.41E
N 8.05 E 2.28 1963.15N 304.14E
N 8.90 E 1.85 2050.47N 317.14E
N 8.98 E 1.61 2139.56N 331.16E
N 7.93 E 3.27 2229.44N 344.51E
1896.01
1986.46
2074.75
2164.92
2255.79
4174.89 2856.49 2797.89
4270.10 2882.16 2823.56
4367.31 2908.71 2850.11
4462.35 2934.27 2875.67
4557.66 2959.16 2900.56
74 34
74 9
74 9
74 38
75 5
N 8.34 E .77 2320.18N 357.48E
N 5.58 E 2.83 2411.18N 368.60E
N 6.96 E 1.37 2504.13N 378.81E
N 7.19 E .57 2594.97N 390.08E
N 7.25 E .48 2686.24N 401.65E
2347.46
2439.11
2532.56
2624.08
2716.07
4653.03
4749.22
4843.49
4939.99
5035 23
2983.33 2924.73
3007.94 2949.34
3034.72 2976.12
3065.80 3007.20
3097.83 3039.23
75 33
74 48
72 11
70 13
70 27
N 7.14 E .50 2777.77N 413.20E
N 6.82 E .84 2870.07N 424.50E
N 6.14 E 2.85 2959.87N 434.70E
N 6.31 E 2.04 3050.67N 444.61E
N 6.48 E .29 3139.81N 454.60E
2808.31
2901.28
2991.61
3082.90
3172.55
5130 82
5227.29
5323 67
5419.-60
5514 00
3131.85 3073.25
3168.67 3110.07
3205.73 3147.13
3242.43 3183.83
3278.67 3220.07
67 50
67 17
67 28
67 31
67 19
N 6.59 E 2.74 3228.55N 464.76E
N 6.03 E .78 3317.18N 474.56E
N 6.71 E .68 3405.59N 484.43E
N 7.30 E .57 3493.56N 495.24E
N 7.19 E .25 3580.03N 506.24E
3261.83
3350.95
3439.87
3528.48
3615.63
5610 26
5705.12
5800 30
5896.18
5992.24
3316.13 3257.53
3353.48 3294.88
3393.39 3334.79
3438.91 3380.31
3488.59 3429.99
66 52
66 45
63 39
59 38
58 3
N 6.71 E .66 3668.05N 516.97E
N 7.16 E .45 3754.61N 527.49E
N 7.90 E 3.33 3840.26N 538.81E
N 7.10 E 4.26 3923.90N 549.83E
N 6.84 E 1.66 4005.50N 559.81E
3704.28
3791.46
3877.85
3962.21
4044.39
6088.02
6184.33
6279.08
6373.89
6469.37
3540.95 3482.35
3596.04 3537.44
3651.34 3592.74
3708.61 3650.01
3769.95 3711.35
55 39
54 34
54 0
51 39
48 23
N 7.79 E 2.65 4085.02N 570.01E
N 7.33 E 1.19 4163.33N 580.40E
N 7.74 E .69 4239.60N 590.49E
N 8.47 E 2.56 4314.38N 601.13E
N 8.09 E 3.43 4386.77N 611.67E
4124.55
4203.54
4280.47
4356.00
4429.16
· ~ S PE ~ PAGE 3
-'-SUN DRILLING SERVICES
ANCHORAGE ALASKA
BP EXPLORATION
MILNE POINT / MPG-13
500292278300
NORTH SLOPE BOROUGH
COMPUTATION DATE: 7/28/97
DATE OF SURVEY: 071797
MWD SURVEY
JOB NUMBER: AK-MM-70204
KELLY BUSHING ELEV. = 58.60 FT.
OPERATOR: BP EXPLORATION
TRUE SUB-SEA COURS COURSE DLS TOTAL
MEASD VERTICAL VERTICAL INCLN DIRECTION RECTANGULAR COORDINATES VERT.
DEPTH DEPTH DEPTH DG MN DEGREES DG/100 NORTH/SOUTH EAST/WEST SECT.
6563.80 3834.46 3775.86 45 24 N 8.52 E 3.17 4454.98N 621.62E 4498.10
6658.42 3902.74 3844.14 42 12 N 7.99 E 3.41 4519.79N 631.04E 4563.58
6753.82 3974.60 3916.00 40 2 N 9.54 E 2.50 4581.78N 640.58E 4626.30
6849.60 4048.11 3989.51 39 41 N 11.54 E 1.39 4642.13N 651.80E 4687.64
6945.24 4121.99 4063.39 39 9 N 11.75 E .57 4701.62N 664.06E 4748.26
7040.84 4196.26 4137.66 38 52 N 11.72 E .29 4760.55N 676.30E 4808.34
7136.05 4270.61 4212.01 38 25 N 10.54 E .91 4818.90N 687.78E 4867.73
7232.17 4346.18 4287.58 37 55 N 10.63 E .53 4877.30N 698.70E 4927.08
7327.38 4421.48 4362.88 37 32 N 10.67 E .40 4934.55N 709.46E 4985.29
7342.41 4433.40 4374.80 37 26 N 11.24 E 2.40 4943.54N 711.20E 4994.43
7421.00 4495.80 4437.20 37 26 N 11.24 E .00 4990.40N 720.51E 5042.14
THE CALCULATION PROCEDURES ARE BASED ON THE USE OF
THREE--DIMENSION MINIMUM CURVATURE METHOD.
HORIZONTAL DISPLACEMENT = 5042.14 FEET
AT NORTH 8 DEG. 12 MIN. EAST AT MD = 7421
VERTICAL SECTION RELATIVE TO WELL HEAD
VERTICAL SECTION COMPUTED ALONG 8.21 DEG.
TIE-IN SURVEY AT SURFACE 0.00' MD
PROJECTED SUREY AT 7,421.00' MD
SPE. f-SUN DRILLING SERVICES
ANCHOR_AGE ALASKA
PAGE
BP EXPLORATION
MILNE POINT / MPG-13
500292278300
NORTH SLOPE BOROUGH
COMPUTATION DATE: 7/28/97
DATE OF SURVEY: 071797
JOB NUMBER: AK-MM-70204
KELLY BUSHING ELEV. = 58.60
OPERATOR: BP EXPLORATION
FT.
INTERPOLATED VALUES FOR EVEN 1000 FEET OF MEASURED DEPTH
TRUE SUB-SEA TOTAL
MEASD VERTICAL VERTICAL RECTANGULAR COORDINATES MD-TVD
DEPTH DEPTH DEPTH NORTH/SOUTH EAST/WEST DIFFERENCE
VERTICAL
CORRECTION
.00 .00 -58.60 .00 N .00 E .0
1000.00 997.33 938.73 43.99 N 11.82 E 2.6
2000.00 1903.41 1844.81 440.70 N 70.62 E 96.5
3000.00 2497.39 2438.79 1217.18 N 179.74 E 502.6
4000.00 2806.99 2748.39 2154.20 N 333.45 E 1193.0
2.67
93.92
406.02
690.40
5000.00 3086.05 3027.45 3106.82 N 450.85 E 1913.9
6000.00 3492.70 3434.10 4012.04 N 560.59 E 2507.3
7000.00 4164.47 4105.87 4735.45 N 671.09 E 2835.5
7421.00 4495.80 4437.20 4990.40 N 720.51 E 2925.2
720.94
593.35
328.23
89.67
THE CALCULATION PROCEDURES ARE BASED ON THE USE OF
THREE-DIMENSION MINIMUM CURVATURE METHOD.
SPE. f-SUN DRILLING SERVICES
ANCHORAGE ALASKA
PAGE
BP EXPLORATION
MILNE POINT / MPG-13
500292278300
NORTH SLOPE BOROUGH
COMPUTATION DATE: 7/28/97
DATE OF SURVEY: 071797
JOB NUMBER: AK-MM-70204
KELLY BUSHING ELEV. = 58.60 FT.
OPERATOR: BP EXPLORATION
INTERPOLATED VALUES FOR EVEN 100 FEET OF SUB-SEA DEPTH
TRUE SUB-SEA
MEASD VERTICAL VERTICAL
DEPTH DEPTH DEPTH
TOTAL
RECTANGULAR COORDINATES
NORTH/SOUTH EAST/WEST
MD-TVD VERTICAL
DIFFERENCE CORRECTION
.00 .00 -58.60
58.60 58.60 .00
158.60 158.60 100.00
258.61 258.60 200.00
358.61 358.60 300.00
.00 N .00 E .00
.00 N .00 E .00 .00
.03 S .02 W .00 .00
.91 S .56 W .01 .01
.79 S .89 W .01 .00
458.61 458.60 400.00
558.65 558.60 500.00
658.76 658.60 600.00
759.03 758.60 700.00
859.57 858.60 800.00
.03 N .62 W .01 .01
2.09 N .67 E .05 .03
6.13 N 2.99 E .16 .11
12.73 N 5.75 E .43 .27
22.80 N 7.98 E .97 .55
960.65 958.60 900.00
1062.49 1058.60 1000.00
1165.41 1158.60 1100.00
1269.36 1258.60 1200.00
1374.95 1358.60 1300.00
37.14 N 10.75
56.20 N 13.26
80.37 N 15.71
108.48 N 19.31
142.01 N 23.87
2.05 1.08
3.89 1.84
6.81 2.92
10.76 3.95
16.35 5.59
1483.78 1458.60 1400.00
1594.83 1558.60 1500.00
1707.23 1658.60 1600.00
1822.99 1758.60 1700.00
1944.19 1858.60 1800.00
184.42 N 30.04
232.26 N 36.60
283.15 N 43.20
340.78 N 51.70
408.06 N 64.17
25.18 8.83
36.23 11.05
48.63 12.41
64.39 15.76
85.59 21.20
2069.10 1958.60 1900.00
2198.59 2058.60 2000.00
2338.28 2158.60 2100.00
2492.61 2258.60 2200.00
2672.79 2358.60 2300.00
481.60 N 78.10
562.51 N 92.73
658.91 N 106.92
775.54 N 120.73
924.09 N 139.61
110.50 24.91
139.99 29.49
179.68 39.69
234.01 54.33
314.19 80.18
2895.91 2458.60 2400.00
3176.83 2558.60 2500.00
3462.21 2658.60 2600.00
3843.72 2758.60 2700.00
4182.82 2858.60 2800.00
1121.72 N 165.02
1380.74 N 207.42
1643.01 N 258.50
2007.41 N 310.44
2327.75 N 358.57
437.30 123.12
618.23 180.92
803.61 185.39
1085.12 281.51
1324.22 239.10
4555.49 2958.60 2900.00
4918.71 3058.60 3000.00
5201.21 3158.60 3100.00
5461.89 3258.60 3200.00
5717.96 3358.60 3300.00
2684.16 N 401.38
3030.77 N 442.41
3293.26 N 472.04
3532.33 N 500.21
3766.29 N 528.97
E 1596.89 272.67
E 1860.11 263.22
E 2042.61 182.50
E 2203.29 160.68
E 2359.36 156.07
SPE. _f-SUN DRILLING SERVICES
ANCHORAGE ALASKA
PAGE
BP EXPLORATION
MILNE POINT / MPG-13
500292278300
NORTH SLOPE BOROUGH
COMPUTATION DATE: 7/28/97
DATE OF SURVEY: 071797
JOB NUMBER: AK-MM-70204
KELLY BUSHING ELEV. = 58.60 FT.
OPERATOR: BP EXPLORATION
INTERPOLATED VALUES FOR EVEN 100 FEET OF SUB-SEA DEPTH
TRUE SUB-SEA TOTAL
MEASD VERTICAL VERTICAL RECTANGULAR COORDINATES MD-TVD
DEPTH DEPTH DEPTH NORTH/SOUTH EAST/WEST DIFFERENCE
VERTICAL
CORRECTION
5935.15 3458.60 3400.00 3957.27 N 553.99 E 2476.55
6119.30 3558.60 3500.00 4110.61 N 573.51 E 2560.70
6291.44 3658.60 3600.00 4249.50 N 591.84 E 2632.84
6452.15 3758.60 3700.00 4373.94 N 609.84 E 2693.55
6597.82 3858.60 3800.00 44'78.71 N 625.14 E 2739.22
117.19
84.16
72.13
60.71
45.68
6732.93 3958.60 3900.00 4568.53 N 638.35 E 2774.33
6863.23 4058.60 4000.00 4650.66 N 653.54 E 2804.63
6992.44 4158.60 4100.00 4730.78 N 670.12 E 2833.84
7120.71 4258.60 4200.00 4809.53 N 686.04 E 2862.11
7247.92 4358.60 4300.00 4886.81 N 700.48 E 2889.32
35.10
30.30
29.21
28.28
27.21
7374.14 4458.60 4400.00 4962.46 N 714.96 E 2915.54
7400.00 4479.13 4420.53 4977.88 N 718.03 E 2920.87
26.22
5.33
THE CALCULATION PROCEDURES USE A LINEAR INTERPOLATION BETWEEN
THE NEAREST 20 FOOT MD (FROM MINIMUM CURVATURE) POINTS
State of Alaska
Alaska Oil & Gas Conservation Comm.
Atten' Lori Taylor
3001 Porcupine Drive
Anchorage, AK 99501
12-Jun-98
Transmittal of Final Prints. Please sign and return copy to the following:
Western Altas Logging Services
Pouch 340013
Prudhoe Bay, AK 99734-0013
and
BP Exploration (Alaska) Inc.
Petrotechnical Data Center MB 3-3
900 E. Benson Blvd.
Anchorage, AK 99519-6612
Services Bluelines
R/F Sepia Film
/~/ppell Name
G-13
G-13
SBT/GR/CCL 1
CCL/GR PERF, PACKER 1
MPH-13 CCL PERF 1
MPH-13 CCL PERF 1
'~'MPH-13 GR/CCL DEPTH REF 1
PH-13 STATIC PRESS SRVY
PI-05 ~/~ INJ PROFILE
/MPB-25 ~/4-.-- INJ PROFILE
PK-30
PH-13
1
CCL PERF 1 1
GR/CCL PERF, PACKER 1
/~rMPH-08 GR/CCL PERF 1
/I~PG-13 GR/CCL PERF - 1
Received by: ~
Date
. . . - ~..~.~ ~ h.~ ~-~.~
.'_-~.,'..;:'~ ,._ .. . .... : ........... ~.. ......
Contact Rebecca Lange if you have a question concerning this transmittal
at (907) 659-2816 or Fax (907) 659-2602.
WELL LOG TRANSMITFAL
To:
State of Alaska
Alaska Oil and Gas Conservation Comm.
Atm.: Loft Taylor
3001 Porcupine Dr.
Anchorage, Alaska 99501
MWD Formation Evaluation Logs -
ot.1...,9°
MPG-13 AK-MM-70204
September 17, 1997
The technical data listed below is being submitted herewith. Please acknowledge receipt by returning a
signed copy of this transmittal letter to the attention of.
Jun Galvi~ Sperry-Sun Drilling Services, 5631 Silverado Way, #G, Anchorage, AK 99518
1 LDWG formatted Disc with verification listing.
A[~: 50-029-22782-00
E RECEiVE
SEP 1 7 1997
vii & Gas'" '
Ancfl0r~e
5631 Silverado Way, Suite G · Anchorage, Alaska 99518 · (907) 563-3256 · Fax (907) 563-7252
A Dresser Industries, Inc. Company
CI F:! I I--I--I IM G SEFIL/ICE S
WELL LOG TRANSMITFAL
To:
State of Alaska
Alaska Oil and Gas Conservation Comm.
Atm.: Loft Taylor
3001 Porcupine Dr.
Anchorage, Alaska 99501 q q' I ~O
MWD Formation Evaluation Logs - MPG-13, AK-MM-70204
September 17, 1997
The technical data listed below is being submitted herewith. Please acknowledge receipt by returning a
signed copy of this transmittal letter to the attention of.'
Jun Galvin, Sperry-Sun Drilling Services, 5631 Silverado Way, #G, Anchorage, AK 99518
MPC~13:
2" x 5" MD Resistivity and Gamma Ray Logs:
50-029-22782-00
2" x 5" TVD Resistivity and Gamma Ray Logs:
50-029-22782-00
1 Blueline
1 Rev. Folded Sepia
1 Blueline
1 Rev. Folded Sepia
SEP !7
5631 Silverado Way, Suite G · Anchorage,/Naska 99518 ° (9.07) 563-3256 ° Fax (907) 563-7252
A Dresser Industries, Inc. Company
TONY KNOWLE$, GOVEFtNOFt
~kLASi~& OIL AND GAS
CONSERVATION COMMISSION
3001 PORCUPINE DRIVE
ANCHORAGE, ALASKA 99501-3192
PHONE: (907) 279-1433
FAX: (907) 276-7542
June 19,1997
Tim Schofield
Senior Drilling Engineer
BP Exploration (Alaska), Inc.
PO Box 196612
Anchorage, AK 99519-6612
ae~
Milne Point MPG- 13
BP Exploration (Alaska). Inc.
Permit No. 97-120
Sur. Loc: 1956'NSL.3439'WEL. SEC 27.TI3N.RIOE. UM
Btmholc Loc: 1564'NSL.2724'WEL.SEC 22.T 13N.R 10E. UM
Dear Mr. Schoficld:
Encloscd is thc approvcd application for pcrmit to drill thc abovc rcfcrcnccd wcll.
Thc pcrmit to drill docs not cxcmpt you from obtaining additional pcrmits rcquircd by laxv from
other governmental agcncics, and docs not authorize conducting drilling opcrations until all other
rcquircd permitting dctcrminations arc madc.
Blowout prcvcntion cquipmcnt (BOPE) must bc tcstcd in accordancc x¥ith 20 AAC 25.035.
Sufficient notice (approximately 24 hours) of thc BOPE tcst pcrformcd bcforc drilling bclow thc
surface casing shoe must bc givcn so that a rcprcscntativc of thc Commission may xvitncss the tcst.
Noticc may be givcn by contacting thc Commission pctrolcum ficld inspcctor on the North Slope
pager at 659-3607.
David ohnston
Chairman
BY ORDER OF THE COMMISSION
dl17 cnclosttrcs
Department of Fish & Game. l labitat Section w o cncl.
l)cpartment ot' Envitmmmct~t Conservation w. o cncl.
--, STATE OF ALASKA
ALASKA O,_ AND GAS CONSERVATION COMb,..SION
PERMIT TO DRILL
20 AAC 25.005
la. Type of work [] Drill [] Redrill Ilb. Type of well [] Exploratory [] Stratigraphic Test [] Development Oil
[] Re-Entry [] Deepenl [] Service [] Development Gas [] Single Zone [] Multiple Zone
2. Name of Operator 15. Datum Elevation (DF or KB) 10. Field and Pool
BP Exploration (Alaska) Inc. Plan RTE = 59.10' Milne Point Unit / Schrader Bluff
3. Address 6. Property Designation
P.O. Box 196612, Anchorage, Alaska 99519-6612 ADL 025516
4. Location of well at surface 7. Unit or Property Name 11. Type Bond (See 20 AAC 25.025)
1956' NSL, 3439' WEL, SEC. 27, T13N, R10E, UM Milne Point Unit
At top of productive interval 8. Well Number Number 2S100302630-277
1314' NSL, 2761' WEL, SEC. 22, T13N, R10E, UM MPG-13
At total depth 9. Approximate spud date Amount $200,000.00
1564' NSL, 2724' WEL, SEC. 22, T13N, R10E, UM 07/13/97
12. Distance to nearest property line113. Distance to nearest well 14. Number of acres in property 15. Proposed depth (MD and TVD)
ADL 025906, 1564'I No Close Approach 2560 7441' MD / 4435' TVD
16. To be completed for deviated wells 17. Anticipated pressure {see 20 AAC 25.035 (e) (2)}
Kick Off Depth 400' Maximum Hole Angle 76.03° Maximum surface 1380 psig, At total depth ('I'VD) 4200' / 1800 psig
18. Casing Program Specifications Setting Depth
Size Top Bottom Quantity of Cement
Hole Casing Weight Grade Coupling Length MD TVD MD TVD (include stage data)
24" 20" 91.4# H-40 Weld 80' 32' 32' 112' 112' 250 sx Arcticset I (Approx.)
8-1/2" 7" 26# L-80 BTC-Mod 7410' 31' 31' 7441' 4494' 730 sx PF 'E', 113 sx Class 'G'
19. To be completed for Redrill, Re-entry, and Deepen Operations.
Present well condition summary
Total depth: measured feet Plugs (measured)
true vertical feet
Effective depth: measured feet Junk (measured)
true vertical feet
Casing Length Size Cemented MD TVD
Structural
Conductor
Surface
Intermediate
Production REcEiVED
Liner
depth: OR/G/N/kL '
ktask~ Oil & Gas Cons. C0rr~missi0r~
Perforation measured Anchorago
true vertical
20. Attachments [] Filing Fee [] Property Plat [] BOP Sketch [] Diver[er Sketch [] Drilling Program
[] Drilling Fluid Program []Time vs Depth Pict [] Refraction Analysis [] Seabed Report [] 20 AAC 25.050 Requirements
Contact Engineer Name/Number: Mark Brofka, 564-4809 Prepared By Name/Number: Kathy Campoamor, 564-5122
21 I hereby certify that
· the foregoing is jtrue and/c~rrect to the best of my knowledge
Signed ~¢/ ~'C'¢/~-y/~' ~0/3//
Tim Schofield Title Senior Drilling Engineer Date 7-
Commission Use Only
Permit Number I AP, Number I Apprgva,pate J See cover letter
./~'~-,/..2 C::) 50- C~.2_ ~ -- .~...2.. ~ ~'.~__. ~//~)/~ ? for other requirements
Conditions of Approval: Samples Required J--lYes .J~]No Mud Log Requi~d/ []Yes J~JNo
Hydrogen Sulfide Measures []Yes ~No Directional Survey Required []Yes [] No
Required Working Pressure for BOPE ,JJ~J2M; 1-13M; l-ISM; I-IIOM; I-I15M
Other: 0riglnal blgi--'
by order of
Approved By David W. dohnstor, Commissioner the commission Date ,,.r/ l // /
-.
Form 10-401 Rev. 12-01-85 Subrr plicate
Shared Services Drilling Contact:
I Well Name:
Mark J. Brofka
I MPG-13
Well Plan Summary
IType of Well (producer or injector): SCHRADER BLUFF
PRODUCER
564-4809
fSurface Location:
Target Location:
Bottom Hole Location:
1956 FSL, 3439 FEL, S27 T13N R10E UM
1314 FSL, 2761 FEL, S22 T13N R10E UM
1564 FSL, 2724 FEL, S22 T13N R10E UM
I AFE Number: I 337083
Rig: Nabors 22E
I Estimated Start Date: I 13 July 1997 I I Operating days to complete: 19.o
IMD: I7441' I ITVD: I4435' I I KBE: I 59.10
I Well Design:
Schrader Bluff Producer
Formation Markers:
Formation Tops MD TVD (bkb)
KOP 400 400
Base of Permafrost 1848 1784
Top of Ugnu 6295 3546
Top M Sand 6640 3806
Top NA (Target) 6936 4057 Top of Schrader Bluff Sands (EMW 8.6 ppg)
NB 6974 4090
NCND 7002 4114
NE 7O33 4141
NF 7090 4190
OA 7128 4223
OA4 7167 4257
OB 7208 4293
Top of Seabee 7241 4494 Base of Schrader Bluff Sands (EMW 8.3 ppg)
TD 7441 4494 TD at 200' MD past base of Schrader
Casing/Tub lng Program:
Hole ~,ize ' Csg~ Wt/Ft Grade Conn. Length Top Bottom
Tbg O.D. MD/TVD MD/TVD (bkb)
24" 20" 91.4# H-40 Weld 80' 32'/32' 112' / 112'
8-1/2" 7" 26# L80 BTC-MOD 7,410' 31'/31' 7,441' / 4,494'
Internal yield pressure of the 7" 26# casing is 7240 psi. With a full column of gas (0.10 psi/ft) to the reservoir at
4- '
_4200 TVDSS, the maximum anticipated surface pressure assuming a reservoir pressure of 1800 psi (8.65 ppg
EMW), is 1380 psi, well below the internal yield pressure rating of the 7" casing.
RECEIVED
Alaska 0il & Gas Cons. Commission
Anchorage
Logging Program:
Open Hole Logs:
Cased Hole Logs:
Mudloggers are NOT rec
MWD from surface to TD
LWD (GR/Resistivity) from top of Ugnu to TD with a controlled drilling speed of
no more than 200 fi/hr from 6295 - 7441' MD.
Drop ESS survey tool at TD to correlate with MWD surveys.
RFT log, drillpipe-conveyed (specific RFT program will be submitted to the rig
prior to logging operations)
NONE
GR/CCL in production casing with completion rig)
uired for this well.
Mud Program: Spud Mud
ISpecial design considerations
ISee "Drilling Hazards and Risks" section about dealing with the
possibility of hydrates
SPUD TO TOP OF SCHRADER BLUFF: I
Density Marsh Yield 10 sec 10 min pH Fluid
(PPG) Viscosity Point gel gel Loss
8.5 80 15 8 10 9 10-15 (initial)
to to to to to to to
9.0 100 35 15 30 10 8-10 (final)
TOP OF SCHRADER BLUFF TO TD: ! LSND freshwater mud
Density Marsh Yield 10 sec 10 min pH Fluid
(PPG) Viscosity Point gel gel Loss
9.0 50 10 3 7 9.0 4
to to to to to to to
9.3 80 (as 20 10 20 9.5 6
required)
Well Control:
Well control equipment consists of: Drilling Rig (Nabors 22E) 21-1/4", 2000 psi W.P. Diverter with 10" Diverter
Line. Completion Rig with 5000 psi W.P. pipe rams, blind/shear rams, and annular preventer will be installed and
is capable of handling maximum potential surface pressures.
Diverter, BOPE, and drilling fluid system schematics on file with AOGCC.
Directional:
I KOP: I 400', Phased Build and Drop, S-shaped
tMaximum Hole Angle:
Close Approach Well:
76.03°
NONE
Waste Management:
Cuttings Handling: All cuttings will be hauled to the CC-2A facility. In the event that the bridges are not usable
due to breakup, all cuttings will be placed in the Milne Point A-Pad reserve pit.
Fluids Handling: All drilling and completion fluids will be hauled to CC-2A for injection. If the bridges over the
rivers are not usable because of breakup, class 2 waste fluids will be hauled to the Kuparuk injection well and
class 1 fluids will be transferred to storage tanks for future disposal after breakup.
Annular Injection: No wells on G-Pad have been permitted for annular injection.
MP G-13
Proposed Summary of Operations
.
2.
3.
4.
5.
.
.
.
10.
11.
12.
13.
14.
15.
16.
Drill and Set 20" Conductor. Weld a starting head and top job nipple on conductor.
Prepare location for rig move.
MIRU Nabors 22E drilling rig.
N/U and function test 21-1/4" Hydril MSP 2M diverter system. Build Spud Mud.
Drill an 8-1/2" surface hole as per directional plan to 7411' MD/4494' TVD. Run Directional MWD and
LWD GR/Res from surface to TD. Change MWD when tripping for the second bit and drill at a controlled
rate of no more than 200 fi/hr through the Schrader Bluff sands.
At TD, make a wiper trip to the last bit trip depth and condition hole, making sure to record any tight spots.
Run and cement 7", 26#, L80, BTC-MOD casing. Cement job will be performed in two (2) stages, as per
the cement program, with an ES cementer set at least 200' MD below the permafrost.
N/D Diverter. N/U FMC Gen 6 Wellhead and Tree. RDMO Nabors 22E drilling rig to drill next well.
(End of Nabors 22E operations)
MIRU completion rig.
N/U & Test BOPE.
Drill out ES cementer and clean out the well.
Run GR/CCL tool.
Complete well with RCP completion.
Set BPV. N/D BOP stack and N/U X-mas tree.
RDMO with completion rig.
Install Surface Lines and Wellhouse and turn well over to production.
DRILLING HAZARDS AND RISKS:
The well is planned as a Schrader Bluff single casing string producer. The well will be drilled, cased, and
cemented with Nabors 22E which will then suspend the well and move on. The well will be completed at a
later date by a completion rig.
See the latest Milne Point G-Pad Data Sheet prepared by Pete Van Dusen for information on G pad.
The MPU PE group MAY be perforating, hydraulic fracturing and cleaning out wells shortly after the rig drills
and completes them. This will make the near rig area congested and as a result potentially hazardous.
Ensure personnel use caution moving around adjacent production activities.
.1 ..Hydrates:
Hydrates have occurred on nearby E and H pads and there is a possibility that hydrates may be encountered
in the drilling of MPG-13. In the eight wells previously drilled on G-pad, only G-8 encountered gas-cut mud,
but only a minor amount. Hydrates on MPG-13 are not expected, but if hydrates are encountered, mud
weights will be increased to 10.2 ppg, or heavier if required, and lecithin (DrillTreat) will be added to the mud
system. The cement program includes an ES cementer set below the permafrost. Should hydrates be
encountered while drilling, the cement program will be modified to include a Permafrost C tail on the second
stage to ensure a high quality cement seal above the hydrate zones. Also, weighted spacers will be used
during the cement displacement to maintain the hydrostatic head on the formation so as to prevent the
movement of hydrates into the wellbore.
2. Close Approach:
There are no close approach problems with MPG-13.
3. Lost Circulation:
Lost circulation has been experienced when drilling the Schrader sands and can be countered by having
LCM on hand. To date, losses seen on past wells in the area have been minor.
4. Stuck Pipe Potential:
No stuck pipe incidents have occurred on G Pad to date, but the rig crew should remain attentive and take
precautions to prevent stuck pipe from occurring. If heavy gravels are encountered, operations should be
immediately stopped while the mud funnel viscosity is increased to 150 cp and maintained through the gravel
section.
5. Formation Pressure:
The expected pore pressure for this well is 8.6 ppg EMW in the Schrader Bluff NA and NB sands, and 8.3 ppg
EMW at TD just past the OB sands.
6. Directional Drillinc~ Concerns
Also, due to the relatively shallow depth of the Schrader Bluff wells and the large stepouts, some directional
drilling will have to be done in the permafrost. The rig crew should be particularly attentive to the wellbore
trajectory to ensure that the target objectives are met. Note that care must be taken when drilling through the
base of the permafrost as severe doglegs may develop. Also, the producer wells will have a high sail angle
and then drop into the reservoir section to allow for the completion.
7. Other
There h,~ve been only a handful of wells drilled on the North Slope with an 8-1/2" surface hole and it is important
that bit and directional performance is closely monitored and reported so that lessons learned can be included in
the next well program. None of the drilling hazards and risks identified above are expected to be magnified by the
change in hole size.
MPG-13
7" SURFACE CASING
CEMENT PROGRAM - HALLIBURTON
CASING SIZE: 7" CIRC. TEMP
SPACER: 50 bbls fresh water spacer (1307' in 7" casing).
: STAGE1 LEAD:
ADDITIVES:
WEIGHT:
APPROX #SACKS:
TYPE 'E' PERMAFROST
Retarder + CELLO-FLAKES (0.25 Ib/sk)
12.0 ppg YIELD:2.17 ft3/sk MIX WATER: 11.63 gal/sk
311 SACKS THICKENING TIME: Greater than 4 hrs at 50° F.
ANNULAR VOLUME FROM THE GREATER OF EITHER 100' TVD OR
500' MD ABOVE THE TOP OF THE UGNU "M" SANDS (6140' MD) TO
THE ES CEMENTER STAGE TOOL (2050' MD > 200' MD BELOW
BASE OF PERMAFROST) + 30% EXCESS.
STAGE1 TAIL CEMENT TYPE:
ADDITIVES:
WEIGHT:
APPROX #SACKS:
FLUID LOSS:
PREMIUM
SILICATE (15 #/sk), CFR-3 (0.2%), HALAD-344 (0.75%)
13.1 ppg YIELD:2.05 ft3/sk MIX WATER: 11.0 gal/sk
113 SACKS THICKENING TIME: Greater than 4 hrs at 50° F.
0-55 cc/30min
TAIL CEMENT FROM TD (7411' MD) TO THE GREATER OF EITHER
100' TVD OR 500' MD ABOVE THE TOP OF THE UGNU "M" SANDS
(6140' MD) + 30% EXCESS + 80' OF 7" 26# CASING CAPACITY FOR
SHOE TRACK.
STAGE2:
ADDITIVES:
WEIGHT:
APPROX #SACKS:
TYPE 'E' PERMAFROST
Retarder
12.0 ppg
419 SACKS
YIELD:2.17 ft3/sk MIX WATER: 11.63 gal/sk
THICKENING TIME: Greater than 4 hrs at 50° F.
PUMP UNTIL RETURNS ARE OBSERVED AT SURFACE BEFORE
DROPPING CLOSING PLUG. +/- 250% EXCESS IS EXPECTED FROM
THE ES CEMENTER TO SURFACE.
WELLHEAD STABILITY CEMENT TYPE: Permafrost E
NOTE:
ADDITIVES: Retarder
WELLHEAD STABILITY CEMENT WILL BE PUMPED ONLY IF THE
CEMENT TOP FALLS BELOW SURFACE AFTER THE PUMPS ARE
SHUT DOWN.
WEIGHT: 12.0 ppg
YIELD:2.17 ft3/sk
MIX WATER: 11.63 gal/sk
APPROX NO SACKS: 150
RECIPROCATE CASING STRING WHILE CEMENTING IF POSSIBLE/PRACTICAL
CENTRALIZER PLACEMENT:
1. Centralize the casing from TD to 100' MD above Ugnu "M" Sands with 7-1/8" x 8-1/4" Rigid
Straight Blade Centralizers - two (2) per joint on the bottom twenty-three (23) joints of
7" casing (46 Rigid Straight Blade Centralizers).
2. Run two (2) Rigid Straight Blade Centralizers on either side of the ES cementer tool.
OTHER CONSIDERATIONS: Perform any necessary laboratory tests on samples of the water to be
used in the cement job to ensure that it is adequate. Also perform lab tests on mixed
cement/spacer/mud program and ensure compatibility prior to pumping job. Ensure thickening
times are adequate relative to pumping job requirement. Displace at 4.5 - 6.0 bpm - pump rates
are crucial to keep ECD's Iow. Mix slurry on the fly -- batch mixing is not necessary.
Be sure to keep detailed records of the cement job, and to report the amount of returns seen from
both stages so that volumes can be modified on future wells if necessary.
CEMENT VOLUME:
I st Stage:
1. The lead slurry volume is calculated to cover from the ES cementer tool (200' MD below base of
permafrost) to the top of the tail slurry, at the greater of either 500' MD or 100' TVD above the top of
the Ugnu "M' Sands, with 30% excess.
2. The tail slurry volume is calculated to cover the greater of either 500' MD or 100' TVD above the top of
the Ugnu "M' Sands to TD with 30% excess.
3. 80' of 7", 26# capacity for the float joints (baffle collar, float collar, and float shoe).
2nd Stage:
1. The slurry volume is calculated to cover from the ES cementer to surface with an excess of 250%
expected to be required. Ensure that additional sacks of cement are onsite and available for use The
slurry will be pumped until cement returns are seen at surface.
Note that in the event that hydrates are encountered, the Operations Drilling Engineer should be notified and a
modified cement program will be submitted to ensure isolation of the hydrate zone.
DISPLACEMENT OF CEMENT:
Because Nabors 22E will be moving off of the well after the cement job, displacement fluid is an important
consideration as the fluid will be left in the hole for some time. The proposed displacement procedure is
as follows:
1. Pump away first stage as per the detailed cement program and displace with seawater a volume
equal to the capacity of the 7" casing from TD up to surface.
2. After bumping the plug, quickly check to ensure that the floats are holding and then shear the ES
cementer to the open position.
3. Circulate seawater through the ES cementer for two hours to clean and condition the contaminated
cement.
4. Pump the second stage as per the detailed cement program, circulating the water through the ES
cementer and across the permafrost to surface. When cement returns are seen at surface, drop the
second stage plug and displace with diesel. The completion rig will recover the diesel freeze
protection fluid for reuse on another well.
Anadr£1] Schlumberger
Alaska DiStrict
1111 East 80th Avenue
A3~chorage, AK 99510
(907) 349-4511 Fax 344-2160
DERECTIONAb ~HLL PLAR for SHARED SERVICES DRILLING
well ......... : MPG-13(P03)
Field ........ : Milne Point, G-Pad
Co~utation..: Minimum Curvature
UnitB ........ : FEST
Surface Lat..: 70.44995419 N
Surface bong.: 149,53362106 W
Legal Description
Surface ...... : 1955 FSh 3439 [~13L S27 T13N RiOB UM
Target ....... : 1314 PSL 276£ FEL S22 T13N RiOH UM
B~T. .......... : 1564 FSL 2724 FEL S22 T13N RIOH UM
LOCATIONS - AI~KA Zooe= 4
X-Ooord Y-Coord
557L64.45 601439L.15
~57~98.00 6019035.00
557832.12 6019285.08
PROPOSED WRL,L PROFIL~
STATION MEASURED INC~N DIRECTION
/DHNTIFICATION DEPTH ANGLE AZIMUTH
~RT£CAL- D~PTHS
KB 0-O0 0.00 0.00 0.00 -59.10
KDP/BUILD //100 400.00 0.00 0.00 4DO.00 340.90
500.00 1.00 8.21 499.99 440.89
BUILD L.75/300 600.00 2.00 8.21 599.96 540.86
700.00 3.75 8.21 699.83 640.73
8ECTION
DEPART
0.00
0.00
O.87
3.49
8.5l
BUXLD 2.5/3oo
800.00 5.50 8.21
900.00 8.00 8.21
I000-00 10-50 8.21
1100.00 13.00 8.21
~200.00 15.50 8-21
799.50 740.40 16.57
898.80 B39.70 28.32
99~.49 938.39 44.39
1095.39 L036.29 64.76
£L92.30 L133.20 89.37
L300.O0 18.00
1400-00 20.50
8.21 1288.05 L228.95 118.19
8.23 L382.45 L323.35 151.35
Prepared ..... : 09 Jun 1997
Vert sect az-: 8,2L
K~ elevation.: 59.L0 ft
Magnetic Dcln: +28.045 (~)
Scale Factor.:
Convergence..: + .4AN~iLL
AKA-DPC
APPROVED
FOR PERMITTING
ONLY
COORDINATRS-PROM ALASKA Zone 4
WHLL~AD X Y
0.00 N 0.00 B 557164,45 6014391.~4
0.0O N 0.00 B 557164.4~ 6014391.£4
0.86 N 0.12 B 557164,57 6014392.00
3.45 N 0,50 ~ 557164,92 6014394.60
8.42 N L.21 H 557165.60 6014399.57
· OOL Db/
PAC~ 100
RS 0.00
8R 0.00
8R ~.00
8R £.00
8R L.75
16.40 N 2.37 H 557166.69 6014407.56 HS 1.75
28.03 N 4.04 B 557168.28 60L4419.20 HS 2.50
43.94 N 6.34 ~ 557170,45 6014435.12 HS 2.50
64-09 N 9.25 H 557373.20 6OL4455.30 HS 2.50
88.46 N L2.76 H 557376.53 60L4479.68 HS 2.50
1L6.98 N t6.87 ~ 557180.42 60L4508.23 HS 2.50
L49.61 N 23,58 ~ 557184.88 60L4540.89 HS 2.50
"O
I:>
U-")
ITl
(Anadrill {c) 97 MP~13P03 3,0C 9:45 AM P) hO
t~vG - L3 (I~0~)
$TATIO~
2 DBNT~FICATION
I~ND 2.5/L00 BUrLD
SRO 3.5/100
DROP 3/100
f4HASURHD
DH ~H
LS00.O0
1600.00
1700.00
1800.00
1818.00
~047.85
1878.00
1900.00
2000.00
2100.00
2200.00
2300.00
2400.00
2500.00
2600.00
2700.D0
2800.00
2900.00
3000.00
3100.00
3~66.L3
5301.45
5400.00
5500.00
5600.00
£NCLN DERECT[ON V~RTECAL-DHPTRS
Ah~LH AZIMUTH TVD SUB-SEA
SECTION
DHPART
23.00 B.21 L475.33 1416.23
25.50 8.21 L566.50 ~507.40
28.00 8.21 £655.79 1596.69
30.50 0,2L 3743.03 1683.93
30.95 8.2L ~758,$0 1699.40
229-28
2q4.28
323.14
332-34
30.95 8.2L ~784.L0 1725.00
30.95 8.2L 3809.96 1750.86
31.72 8.2L 1828.75 1769.65
3~.22 8.2[ 1912./6 1853.06
38.72 8.2~ 1992,04 1932.94
347.69
363.~9
374.64
429.78
489.91
42.22 8-21 2068.L0 2009,00
45.72 8.21 2140.06 2080.96
69.22 8.21 220~.65 2L48.55
52-72 8.21 2270.53 22L~.5~
56.22 8.21 2328-?1 2269.61
554.80
624.22
697.90
975.57
856.94
59.72 8.21 238L.74 2322.64
63.22 8.21 2429-50 2370.40
66.72 8.21 247[.80 24L2.70
70.22 8.21 2508-49 2449.39
73.72 8.2~ 2539.44 2480.34
941.70
1029.54
1120.~4
1213.~5
1308.22
76-03 6.21 2556.69 2497.59
76.03 8.21 3072.02 30~2.92
73.08 8.21 3098.26 3039,16
70.08 8.2~ 3L29.86 3090.76
67.08 8.21 3L66.38 3107.28
1372.06
3%44.26
3539.24
3634-/[
3727-L9
5700.00
5800.00
5900.00
64.08 8.21 3207.72 3/48.62
61.08 8.21 3253.77 3[94 .67
58 .08 8.21 33 04 .~0 3245.30
38L8.23
3906.98
3993.2L
09 Jun 1997 Page 2
OOORDINATHS-FRO~ ALASKA Zone 4 TO0h DL/
H~LI/q~AD X Y FAC~ lO0
186.28 ~ 26.87 B 557189,89 601457?.60 HS 2.50
226.93 N 32.73 H 557195.44 60146L8.29 HS 2,50
271.47 N 39.16 ~ 557201.52 6014662.88 HS 2.~0
319.83 N 46.14 ~ 557208.L3 6014711.28 HS 2.50
328.93 N 47.45 E 557209.3~ 60~4720.39 HS 2-50
344.]2 N 49,64 E 5572LL.44 60L4735.60 I--h..q 0.00
359.47 N 51.85 E 5572L3.54 60L4750.97 HS 0.00
370.80 N 53.49 E 5572L5.09 6014762.30 }IS 3.50
425.37 N 61.36 E 557222.54 601~816.93 HB 3.50
484.89 N 69.94 ~ 557230.67 60]4876.50 HS 3.50
549.12 N 79.2~ B 567239.44 6014940.80 HS 3.50
6L7.82 N 89.L2 B 557248.82 6015009.57 HS 3,50
690.75 N 99.64 H 557258.78 6015082.57 HS 3.50
767.62 N 110.73 ~ 557269,28 6015L59.52 RS 3,~0
848.16 N ~22.35 a 557280.28 601~240.[3 HS 3.~0
932.05 N 134.45 H 557291.73 6015324.L1 HS 3.50
L019.O0 N 346.99 ~ 557303.6/ 6015411.14 HS 3.$0
1108,66 N 1~9.92 H 557315.85 6015500.89 HS 3.50
L200.72 N 173.20 H 557328.42 6015593.04 HS 3.50
L294.82 N 186.78 H 55734L.27 6015687-23 HS 3.50
1358.00 N 195.89 B 557349.90 60L5750.47 HS 3.50
3408.98 N 49L.74 B 557629.98 60L7803.46 LS 0.00
3502.98 N 505.30 H 557642.82 60L7893.56 LS 3.00
3596.88 N 518.85 H 557655.64 60L799L.55 LS 3.00
3689.0£ N 532.14 ~ 557668.23 60L8083.76 LS 3_00
3779,LL N 545.14 B 557680.53 60L8173.96 LS 3.00
3866.96 N 557.8L H 557692.53 60L826L.89 l~S 3,00
3952.30 N 570.12 ~ 557704.18 60~83~7.31 LS 3,00
(AnacLvL1L (c) 97 MPG13P03 3.0C 9:45 AM P) ~
I DI~}~T[ FI CAT ~01~
· OP U~R~U
TOP M SAND
PROPOSED WRLL PROI; ][ I.~
MIgASLrRED INCLN D]RSCTION
D~PTR ANGLH AZ£R1/TH
6000.00 55.08 8.21
6/00.00 52.08 8.2~
6200.00 49.08 8.21
6294.68 46.24 8.21
6300.00 46.08 8.21
6400.00 43-08 6.21
6500.00 40.08 8.21
6600.00 37.08 8.21
6639.96 35.88 8.21
6700.00 34.08 8.21
6800.00 31-08 8.22
E2{D 3/200 DROP 6935.94 30.00 8.21
TARGET 6935.94 30.00 8.22
TOP S(~AD~R / ~ 6935.94 30.00 8.21
NB 6974.04 30.00 8.22
NC/ND 7001.75 30.00 8.2~
NH 7032.93 30.00 8.22
NF 7089.51 30.00 8-23
OA 7227.62 30.00 8-21
QA4 7~66.88 30.00 8-21
VHRTICAL-OHPTHS
TVD SUB-SEA
3359.67 3300.37
34~8,84 3359.74
3482.33 3423.23
3546.~0 3487.00
3549.78 3490.68
OB 7208,44 30.00 0.2~
BASE SCHRADER 7240,78 30.00 8.21
7" CASING POINT 7440,78 30.00 8.21
T~ 7440.78 30.00 8.21
09 JUn [997 Page 3
SECTION COORDINATES-FRCX4
DSPART WELLJ~EAD
4076.66 4034.90 N 582,03
~[57.12 4114.~3 ~ 593,52
4234.36 4190.98 ~ 604.55
4304,33 4260,24 ~ 614.54
4300.[7 4264.03 ~
ALASKA Zone 4
X ¥
557715.46 6018429.99
5577~6.34 60185~9.71
557736.78 6018586.23
557746.23 6018655.56
615.08 ~ 557746.75 60186~9.36
3621.00 3561.90 4378.35 4333.50 N 625.[0
3695-80 3636.70 4444.71 4399.[7 N 634.58
3773.97 3714.87 4507.06 4460.88 N 643.48
3006.~0 3747.00 4530.8£ 4484.40 N 646.87
3855-29 3796.19 4565.~3 45L8.46 N 65~.79
(Anadriil (c)97 MPG23P03 3,0C 9:~5 AM P)
3939.55 3880.45 4619,07 457L.75 N 659.47
3970.50 391£.40 4637.33 4589.82 N 662.08
4057.20 3998.00 4687.33 4639.31 N 669.22
4057.10 3998.00 4687.33 4639.31 ~ 669.22
4090.~0 4031.00 {706.38 4658.17 N 67~.94
~/I14 . :10 4055.00
4141.20 4082.00
4L90.20 4131 .00
4223 .]0 4164.00
4257.20 4196{ .00
4720.24
4735.83
4764.1]
4783.17
4802.80
4823.58
4839.75
4939.75
4939.75
4293.10 4234,00
4321.10 4262.00
4494.3~ 4435.21
4494.3~ 4435.2~
PACH LO0
LS 3.00
~S 3.00
LS 3.00
LS 3-00
LS 3.00
557756.24 6018728.89 LS 3.00
557765.21 6018794.63 LS 3.00
557773.63 6018856.40 LS 3.00
557776.85 6018879.94 LS 3,00
557781.50 60189~4.03 LS 3.00
557788.77 6018967.3? LS 3.00
557791.24 6018985.46 HS 3.00
557798.00 60[9035.00 ~S 0.00
557798.00 60L9035.00 HS 0.00
557800.58 60L9053.88 HS 0.00
4672.88
4687.31
47~5.31
4734.17
4753.60
673.92 B 557802.45 6019067.60 HS 0.00
676.14 E 557804.55 60~9083.05 HS 0.00
680.18 E 557808.38 60~9111.08 HS 0.00
682.90 g 557810.95 6019129.95 [-iS 0.00
685.70 E 557013.61 6019149.40 RS 0.00
4774.17
4790.17
4889.14
4889.14
688.67 g 557036.42 6019169.99 }IS 0.00
690.96 g 557828.60 6019L86.01 HS 0.00
705.26 ~ 557832.12 6019285.08 O,O0
705.26 B 557832.12 6019285.08 0.00
ANADRILL AKA-DPC
APPROVED
FOR PERMITTING
PLAN
Z
SHA ED SERVTCES
·
iii
D ILLI G'
Anadr Y ]] Schlumberger
MPG- 13 (PO3)
VERTICAL SECTION VIEW
I
__ A i ANADRIL. L. ' ........ AKA~DPC JSection at: 8,2~
· A, PPRC}VED ITVD scale.: '1 inch: 800 feet
IDep Scalei: '[ inch = BO0 feet
.___, i:OR )ERNtlTT NG ~o., 1§97
~'- PLA~ :~ ~
-- 0 .... Marker Identification MD BKB SECTN INCLI
I ......... ~v ....... J A) KB 0 0 0 O.OI
B) I(QP/BIJILD I/lO0 400 400 0 0,0(
__ C) BUILD 1,7§/)OO 600 600 3 2,01
~~= O) BUILD 2.5/100 BOO BOO 17
E) END 2.5/~00 BUILO IB18 17§9 332 30.
F) BDILD 3.5/100 I970 IBIO 363 30.9!
-- . ....... G] END 3,5/)00 BUILD 3166 2557 ~372 ?6.0:
I(J DRDP 3/100 §301 3072 3444 76.0'.
' ll~!k;~'bi~l~-~)1 IJ END 3/100 ~OP 683§ 3970 4637 30,0~
F ~, JI TA~ET 6936 4057 4687 30,0~
--~ K) 7" CASING P§INT 744! 4494 4940
L) TD 7441 4494 4940 30,0
.......
--::::_- .-. :::::_-::=::
~ ..... , ~_-_--.
,,
o 400 8oo ]2oo 1§oo 2000 2400 2800 3200 3600 ,~ooo 4400 4o00 520o 5§00 6000 6400
Section Departure
Ana~[]] (c197 ~GI3P03 3,0C 9:46 All
6800
06/09/1997 11:17 907-344-2160
A~ADRILL DPC
NPG- ] 3 (PO3)
VERTICAL SECTION VIEW
Section at: 6].2]
TVD Scale.: ~ inch : ]00 feet
Oep ScaJe.: ~ inch- ~00 feet
Draun ..... : 09 dun J997
,4nad£j ]] Sch]u~Derge£
Marl<er Identification ~0 BK~ SECTN INCLN
A] END 3/]00 DROP 6B36 ~gTO 4637 30,00
B) T~RGET 6936 4057 4687 30.00
C) 7' CASING POINT 744~ 4494 4940 30,00
D) TD 7441 4494 4940 30.00
4400 4450 4500 4550 4600 4650 4700 4750 4800 4850 4900 .4950 §000 5050 5100
Section Departure
(~nadr111 (c)97 NPS: 3.0C 9:~9 A~ P!
Marker Ident i ficat ion HO N/S E/W
~ ~o~/~U~LO ~/~oo ~oo o ~
CI BUILD 1.75/100 800 3 N 0
E) END 2.5/100 BUILD 1838 329 N 47 E
~) ~U~LO 3.~/~oo ~a 3~ N ~ E
G) END 3.5/~00 BUILD 3'66 ~358 N 196
H) DROP 3/t00 5301 3408 N 492 E
I) END 3/t00 DROP 6836 45~0 N 662 E
J) TARGET 6936 4639 N 669 E
K) 7' CASZNG POINT 744~ 4889 N 705
L) TD 7441 4BBB N 705 E
MPG-13 (1:03)
PLAN VIEW
CLOSURE ..... : 4940 feet at Azimuth
DECLINATION.: +28.045 (E)
SCALE .......: ! inch = 800 feet
DRAWN .......; 09 dun 1997
Anadpi ]] $ch]umDepger
8.2~
,
I ANAl I~ILL "AKA-D =C
A)PRCVED
I
- ~
.,,
......
.... RECEIV] D
J U N 1 5 19~ 7
,,
400 0 400 800 ~200 ~600 2000 2400 2800 3200 3600 4000 4~00 aBO0 5200
<- WEST ' EAST ->
Omad~il] 1c197 ~G{3P03 3.0C 9:49 AH M
WELL PERMIT CHECKLISToo Y
/-- ~SF;/ GEOL AREA
PROGRAM: exprl dev~redrlr] servn wellbore segr] ann disp para~req[q
ADMI N I STRAT I ON
1. Permit fee attached .................. N
2. Lease number appropriate ............... N
3. Unique well name and number .............. N
4. Well located in a defined pool ............. N
5. Well located proper distance from drlg unit boundary. . N
6. Well located proper distance from other wells ..... N
7. Sufficient acreage available in drilling unit ..... N
8. If deviated, is wellbore plat included ........ N
9. Operator only affected party .............. N
10. Operator has appropriate bond in force ......... N
11. Permit can be issued without conservation order .... N
12. Permit can be issued without administrative approval. . N
13. Can permit be approved before 15-day wait ....... N
ENGINEERING
14. Conductor string provided ............... ~ N
15. Surface casing protects all known USDWs ........ ~ N
16. CMT vol adequate to circulate on conductor & surf csg. i~i ~___ ~~_~
17. CMT vol adequate to tie-in long string to surf csg . .
18. CMT will cover all known productive horizons ......
19. Casing designs adequate for C, T, B & permafrost ....
20. Adequate tankage or reserve pit .............
N
21. If a re-drill, has a 10-403 for abndnmnt been approved. ~__..~_~'~1
22. Adequate wellbore separation proposed .......... N~7~
23. If diverter required, is it adequate .......... N
24. Drilling fluid program schematic & equip list adequate . N
25. BOPEs adequate ..................... N
26. BOPE press rating adequate; test to ~-~ psig. N
27. Choke manifold complies w/API RP-53 (May 84) ...... N
28.
Work will occur without operation shutdown .......
29. Is presence of H2S gas probable ............. Y
GEOLOGY
?
30. Permit can be issued w/o hydrogen sulfide measures .... Y
31. Data presented on potential overpressure zones ..... Y~
32. Seismic analysis of shallow gas zones ..........
33. Seabed condition survey (if off-shore) ........ /Y N '
34. Contact name/phone for weekly progress reports . . y . Y N
[exploratory only]
REMARKS
GEOLOGy: ENGINEERING: COMMISSION:
Comments/Instructions:
HOW/dlf- A:\FORMS\cheklist rev 01/97
Well HistorY File
APPENDIX
Information of detailed nature that is not
particularly germane to the Well Permitting Process
but is part of the history file.
To improve the readability of the Well History file and to
simplify finding information, information of this
nature is accumulated at the end of the file under APPENDIX.
No special effort has been made to chronologically
organize this category of information.
Sperry-Sun Drilling Services
LIS Scan Utility
Mon Nov 16 15:26:21 1998
Reel Header
Service name ............. LISTPE
Date ..................... 98/11/16
Origin ................... STS
Reel Name ................ UNKNOWN
Continuation Number ...... 01
Previous Reel Name ....... UNKNOWN
Comments ................. STS LIS Writing Library.
Services
Scientific Technical
Tape Header
Service name ............. LISTPE
Date ..................... 98/11/16
Origin ................... STS
Tape Name ................ UNKNOWN
Continuation Number ...... 01
Previous Tape Name ....... UNKNOWN
Comments ................. STS LIS Writing Library.
Services
Physical EOF
Comment Record
TAPE HEADER
MILNE POINT UNIT
MWD/MAD LOGS
WELL NAME:
API NUMBER:
OPERATOR:
LOGGING COMPANY:
TAPE CREATION DATE:
JOB DATA
JOB NLTMBER:
LOGGING ENGINEER:
OPERATOR WITNESS:
SURFACE LOCATION
SECTION:
TOWNSHIP:
RANGE:
FNL:
FSL:
FEL:
FWL:
ELEVATION (FT FROM MSL 0)
KELLY BUSHING:
MWD RUN 2
AK-MM-70204
PIEPER
ANGLEN
Scientific Technical
REPRoCESSED
TI,IlS !!~I~PLAC~ ~LL R~EVIOU§ DATA
,. I i i
MPG-13 (DEPTH CORREC
500292278200
BP EXPLORATION (ALASKA), INC.
SPERRY-SUN DRILLING SERVICES
16-NOV-98
27
13N
10E
1956
3439
NOV 1 8 1998
Anchorage
.00
DERRICK FLOOR:
GROUND LEVEL:
WELL CASING RECORD
1ST STRING
2ND STRING
3RD STRING
PRODUCTION STRING
REMARKS:
58.60
29.60
OPEN HOLE CASING DRILLERS
BIT SIZE (IN) SIZE (IN) DEPTH (FT)
20.000 112.0
8.500 7417.0
1. ALL DEPTHS ARE MEASURED DEPTHS (MD) UNLESS OTHERWISE
NOTED.
2. ALL MWD DEPTHS ARE CORRECTED/SHIFTED TO THE
SCHLUMBERGER GR WHICH
WAS LOGGED ON 03 JUNE, 1998. THE SURVEY PROVIDED WITH
THIS LOG IS NOT
DEPTH CORRECTED AND IT IS NOT THE FINAL OR OFFICIAL
SURVEY. HOWEVER, THE
PROJECTED FINAL SURVEY POINT HAS BEEN SHIFTED.
3. MWD RUN 1 IS DIRECTIONAL ONLY AND IS NOT PRESENTED.
4. MWD RUN 2 IS DIRECTIONAL WITH DUAL GAMMA RAY (DGR)
UTILIZING GEIGER-
MUELLER TUBE DETECTORS, AlkrD ELECTROMAGNETIC WAVE
RESISTIVITY PHASE-4 (EWR4)
5. THIS WELL HAS BEEN REPROCESSED DUE TO A CHANGE OF
DEPTH SHIFTING/CORRECTION
REQUIREMENTS AS PER THE E-MAIL MESSAGE FROM KATIE
NITZBERG OF
BP EXPLORATION (ALASKA), INC. ON 29 OCTOBER, 1998. THIS
DATA SHOULD
REPLACE ALL PREVIOUS DATA PROVIDED BY SPERRY-SUN
DRILLING SERVICES.
6. THIS WELL REACHED A TOTAL DEPTH (TD) OF 7417'MD,
4493'TVD.
SROP = SMOOTHED RATE OF PENETRATION WHILE DRILLING.
SGRC = SMOOTHED GAMMA R_AY COMBINED.
SEXP = SMOOTHED PHASE SHIFT-DERIVED RESISTIVITY
(EXTRA-SHALLOW SPACING).
SESP = SMOOTHED PHASE SHIFT-DERIVED RESISTIVITY
(SHALLOW SPACING).
SEMP = SMOOTHED PHASE SHIFT-DERIVED RESISTIVITY (MEDIUM
SPACING).
SEDP = SMOOTHED PHASE SHIFT-DERIVED RESISTIVITY (DEEP
SPACING).
SFXE = SMOOTHED FORMATION EXPOSURE TIME FOR RESISTIVITY
SENSOR.
ALL CURVES WITH THE EXTENTION "S" ARE DEPTH
SHIFTED/CORRECTED TO WIRE-LINE GR.
$
File Header
Service name ............. STSLIB.001
Service Sub Level Name...
Version Number ........... 1.0.0
Date of Generation ....... 98/11/16
Maximum Physical Record..65535
File Type ................ LO
Previous File Name ....... STSLIB.000
Comment Record
FILE HEADER
FILE NUMBER: 1
EDITED MERGED MWD
Depth shifted and clipped curves; all bit runs merged.
DEPTH INCREMENT: .5000
FILE SUMMARY
PBU TOOL CODE START DEPTH STOP DEPTH
FET 4466 0 7359 5
RPD 4466 0 7359 5
RPM 4466 0 7359 5
RPS 4466 0 7359 5
RPX 4466 0 7359 5
GR 4472 5 7367 0
ROP 4523 0 7417 0
$
BASELINE CURVE FOR SHIFTS:
CURVE SHIFT DATA (MEASURED DEPTH)
BASELINE DEPTH
4472 5
4967
4975
4981
4987
5002
5005
5034
5036
5038.0
5039.5
5046.5
5090.0
5097.0
5099.0
5122.0
5131 5
5135 5
5139 5
5197 5
5201 5
5222 0
5227 0
5232 5
5274 5
5278 0
5319 5
5462 0
5468 0
5476 0
5484 0
5489 0
GR
4482 0
4977 0
4982 5
4988 5
4993 5
5010 0
5016 0
5039 0
5040 0
5041.5
5043.0
5051.0
5099.5
5104.0
5105.0
5133.0
5138.0
5143.5
5147.5
5201 0
5202 0
5229 5
5232 0
5239 5
5281 0
5284 5
5323 0
5470 0
5477 0
5485 0
5494 0
5498 0
EQUIVALENT UNSHIFTED DEPTH --
5518.0
5520.5
5540.0
5547.0
5550.0
5586.0
5601.0
5606 0
5607 5
5610 5
5614 5
5615 0
5626 0
5632 5
5638 5
5643 0
5646 0
5664 0
5669 5
5678 5
5685 0
5689 5
5703 5
5710 0
5724 5
5732 0
5735 5
5739 5
5749 0
5757 5
5760 5
5765 5
5986 0
5990 0
5994 0
6008 5
6014 0
6021 0
6058 5
6065 0
6070 0
6101 5
6105 0
6108 5
6111 0
6116 5
6120 5
6131 0
6134 0
6144.5
6153.5
6157.5
6187.0
6192 . 5
6199.0
6207.5
6213.5
5526.0
5529.5
5551.0
5554 5
5557 0
5592 0
5608 0
5612 5
5615 5
5618 0
5620 5
5621 0
5635 0
5638 0
5645 0
5650 0
5651 5
5671 5
5677 5
5685 0
5690 5
5697 0
5711 5
5716 0
5731 5
5737 5
5742 0
5747 0
5756 5
5766 5
5770 5
5774 5
5994 5
5999 0
6002 0
6017 0
6021 0
6029 0
6071 5
6075 0
6079.5
6110.5
6113.0
6115.0
6120.0
6124.5
6130.5
6138.5
6140 5
6152 0
6161 5
6165 0
6195 0
6199 0
6208 5
6215 5
6222 5
6218
6222
6226
6228
6244
6247
6252
6257
6264
6272
6279
6284
6293
6297
6303
6307
6310
6326
6331
6335
6343
6354
6364
6372
6374
6380
6384
6401
6413
6435
6465
6481
6499
6500
6502
6504
6506
6519
6531
6535
6539
6544
6548
6575
6593
6598
6604
6610
6618
6625
6629
6635
6638
6641
6659
6663
6666
6225 0
6230 5
6235 0
6238 0
6251 5
6255 5
6261 5
6265 5
6273 0
6279 0
6286 5
6291 5
6297 5
6300 0
6305 5
6310 5
6316 5
6332 5
6338 0
6340 0
6349 5
6362 5
6369 0
6377 5
6381 0
6386 5
6391 0
6406 5
6418 5
6443 5
6472 5
6488 0
6504 5
6507.0
6508.0
6510.0
6511.5
6524.0
6536.5
6539.0
6545 5
6550 0
6553 0
6579 5
6598 5
6602 0
6606 5
6614 0
6623 0
6629.5
6633 0
6639 0
6642 5
6647 0
6665 5
6668 0
6669 5
6669
6671
6673
6675
6678
6683
6687
6689
6691
6695
6697
6701
6704
6711
6715
6716
6719
6721
6726
6792
6795
6798
6803
6805
6807
6809
6810
6812
6816
6825
6829
6836
6838
6841
6866
6873
6878
6885
6891
6894
6924
6929
6933
6954
6957
6963
6969
6978
6988
7015
7031
7043
7055
7058
7076
7078
7083
5
5
0
5
0
0
0
5
5
5
5
5
0
5
0
5
0
.5
0
0
5
0
0
5
0
0
0
0
0
5
.0
5
5
5
0
5
5
5
.0
5
5
0
0
0
0
0
5
5
5
.5
0
5
5
5
5
5
5
6675
6676
6677
6680
6683
6688
6693
6694
6696
6699
6701
6704
6709
6715
6718
6720
6723
6726
6732
6795
6799
6802
6806
6808
6812
6813
6815
6817
6822
6830
6835
6839
6842
6845
6870
6876
6881
6887
6895
6895
6928
6932
6936
6957
6961
6968
6978
6983
6992
7021
7037.
7050.
7059.
7061.
7079.
7081.
7089.
7092
7096
7116
7120
7124
7130
7135
7139
7141
7150
7152
7165
7167
7176
7188.
7196.
7209.
7218.
7417.
$
MERGED DATA SOURCE
PBU TOOL CODE
MWD
$
REMARKS:
7098 0
7100 5
7120 0
7125 0
7128 0
7132 5
7139 5
7143 5
7146 0
7158 0
7159 0
7168 0
7169 5
7180 5
7192 5
7198 0
7210 0
7222.0
7421.0
BIT RUN NO MERGE TOP MERGE BASE
2 4523.0 7417.0
MERGED MAIN PASS.
$
Data Format Specification Record
Data Record Type .................. 0
Data Specification Block Type ..... 0
Logging Direction ................. Down
Optical log depth units ........... Feet
Data Reference Point .............. Undefined
Frame Spacing ..................... 60 .liN
Max frames per record ............. Undefined
Absent value ...................... -999.25
Depth Units .......................
Datum Specification Block sub-type...0
Name Service Order Units
DEPT FT 4 1 68
ROP MWD FT/H 4 1 68
GR MWD AAPI 4 1 68
RPX MWD OHMM 4 1 68
RPS MWD OHMM 4 1 68
RPM MWD OHMM 4 1 68
RPD MWD OHMM 4 1 68
FET MWD HOUR 4 1 68
Size Nsam Rep Code Offset Channel
0 1
4 2
8 3
12 4
16 5
20 6
24 7
28 8
Name Min Max Mean
DEPT 4466 7417 5941.5
R0P 15.6916 912.305 229.239
Nsam
5903
5789
First
Reading
4466
4523
Last
Reading
7417
7417
GR 15.5736 112.252 60.729
RPX 0.9615 80.6947 7.19094
RPS 0.9735 67.6329 7.49954
RPM 0.9607 63.7239 7.27664
RPD 0.9397 56.3699 7.51424
FET 0.1222 10.7901 0.868517
5790
5788
5788
5788
5788
5788
4472.5
4466
4466
4466
4466
4466
7367
7359.5
7359.5
7359.5
7359.5
7359.5
First Reading For Entire File .......... 4466
Last Reading For Entire File ........... 7417
File Trailer
Service name ............. STSLIB.001
Service Sub Level Name...
Version Number ........... 1.0.0
Date of Generation ....... 98/11/16
Maximum Physical Record..65535
File Type ................ LO
Next File Name ........... STSLIB.002
Physical EOF
File Header
Service name ............. STSLIB.002
Service Sub Level Name...
Version Number ........... 1.0.0
Date of Generation ....... 98/11/16
Maximum Physical Record.,65535
File Type ................ LO
Previous File Name ....... STSLIB.001
Comment Record
FILE HEADER
FILE NUMBER: 2
R3kW MWD
Curves and loH header data for each bit run in separate files.
BIT RUN NUMBER: 2
DEPTH INCREMENT: .5000
FILE SUMMARY
VENDOR TOOL CODE START DEPTH STOP DEPTH
FET 4475 0 7363 5
RPD 4475 0 7363 5
RPM 4475 0 7363 5
RPS 4475 0 7363 5
RPX 4475 0 7363 5
GR 4482 0 7371 0
ROP 4532 5 7421 0
$
LOG HEADER DATA
DATE LOGGED: 17-J/3L-97
SOFTWARE
SURFACE SOFTWARE VERSION: 5.06
DOWNHOLE SOFTWARE VERSION:
DATA TYPE (MEMORY OR REAL-TIME):
TD DRILLER (FT) :
TOP LOG INTERVAL (FT) :
BOTTOM LOG INTERVAL (FT) :
BIT ROTATING SPEED (RPM) :
HOLE INCLINATION (DEG
MINIMUM ANGLE:
MAXIMUM ANGLE:
TOOL STRING (TOP TO BOTTOM)
VENDOR TOOL CODE TOOL TYPE
DGR DUAL GAMMA RAY
EWR4 ELECTROMAG. RESIS. 4
$
BOREHOLE AATD CASING DATA
OPEN HOLE BIT SIZE (IN):
DRILLER' S CASING DEPTH (FT) :
BOREHOLE CONDITIONS MUD TYPE:
MUD DENSITY (LB/G):
MUD VISCOSITY (S) :
MUD PH:
MUD CHLORIDES (PPM) :
FLUID LOSS (C3) :
RESISTIVITY (OHMM) AT TEMPEP~ATURE (DEGF)
MUD AT MEASURED TEMPERATURE (MT):
MUD AT MAX CIRCULATING TERMPERATURE:
MUD FILTRATE AT MT:
MUD CAKE AT MT:
NEUTRON TOOL
MATRIX:
MATRIX DENSITY:
HOLE CORRECTION
(IN) :
TOOL STANDOFF (IN) :
EWR FREQUENCY (HZ) :
REMARKS:
$
Data Format Specification Record
Data Record Type .................. 0
Data Specification Block Type ..... 0
Logging Direction ................. Down
Optical log depth units ........... Feet
Data Reference Point .............. Undefined
Frame Spacing ..................... 60 .liN
Max frames per record ............. Undefined
Absent value ...................... -999.25
Depth Units .......................
Datum Specification Block sub-type...0
5.46
MEMORY
7417.0
4523.0
7417.0
37.4
75.6
TOOL NUMBER
P0771CRG6
P0771CRG6
8.500
8.5
SPUD
9.00
70.0
9.0
800
5.2
3.600
2.600
3.500
3,800
31.7
Name Service Order Units Size Nsam Rep Code Offset Channel
DEPT FT 4 1 68
GR MWD 2 AAPI 4 1 68
RPX MWD 2 OHMM 4 1 68
RPS MWD 2 OHMM 4 1 68
RPM MWD 2 OHMM 4 1 68
RPD MWD 2 OHMM 4 1 68
R0P MWD 2 FT/H 4 1 68
FET MWD 2 HOUR 4 1 68
0 1
4 2
8 3
12 4
16 5
20 6
24 7
28 8
Name Min Max Mean
DEPT 4475 7421 5948
GR 15.574 112.252 60.7295
RPX 0.961 80.695 7.19529
RPS 0.974 67.633 7.49948
RPM 0.961 63.724 7.27385
RPD 0.94 56.37 7.50721
ROP 14.116 912.305 229.018
FET 0.122 10.79 0.86666
First Last
Nsam Reading Reading
5893 4475 7421
5779 4482 7371
5778 4475 7363.5
5778 4475 7363.5
5778 4475 7363.5
5778 4475 7363.5
5778 4532.5 7421
5778 4475 7363.5
First Reading For Entire File .......... 4475
Last Reading For Entire File ........... 7421
File Trailer
Service name ............. STSLIB.002
Service Sub Level Name...
Version Number ........... 1.0.0
Date of Generation ....... 98/11/16
Maximum Physical Record..65535
File Type ................ LO
Next File Name ........... STSLIB.003
Physical EOF
Tape Trailer
Service name ............. LISTPE
Date ..................... 98/11/16
Origin ................... STS
Tape Name ................ UNKNOWN
Continuation Number ...... 01
Next Tape Name ........... UNKNOWN
Comments ................. STS LIS Writing Library.
Services
Reel Trailer
Service name ............. LISTPE
Date ..................... 98/11/16
Origin ................... STS
Reel Name ................ UNKNOWN
Continuation Number ...... 01
Next Reel Name ........... UNKNOWN
Scientific Technical
Comments ................. STS LIS Writing Library. Scientific Technical
Services
Physical EOF
Physical EOF
End Of LIS File
* ALASKA COMPUTING CENTER *
* ..... WESTERN ATLAS LOG .... *
* ....... PROCESSED BY ....... *
....... SCHLUMBERGER .......
COMPANY NAME : BP EXPLORATION (ALASKA)
WELL NAME : MPG-13
FIELD NAME : MILNE POINT
BOROUGH '. NORTH SLOPE
STATE : ALASKA
API NUMBER : 500292278200
REFERENCE NO : 98396
RECEIVED
AUG ?-0 1998
oit & Gas cons. com~'~issio~
LIS Tape Verification Listing
Schlumberger Alaska Computing Center
4-AUG-1998 10:57
PAGE:
**** REEL HEADER ****
SERVICE NA~E : EDIT
DATE : 98/08/ 4
ORIGIN : FLIC
REEL NAME : 98396
CONTINUATION # :
PREVIOUS REEL :
COf~V~_2TT : BP EXPLORATION, MPG-13, MILNE POINT, API# 50-029-22782-00
**** TAPE HEADER ****
SERVICE NAM~ : EDIT
DATE : 98/08/ 4
ORIGIN : FLIC
TAPE NA~IE : 98396
CONTINUATION # : 1
PREVIOUS TAPE :
COf4~HANT : BP EXPLORATION, MPG-13, MILNE POINT, API# 50-029-22782-00
TAPE HEADER
MILNE POINT
CASED HOLE WIRELINE LOGS
WELL NAME: MPG-13
API ~ER: 500292278200
OPERATOR: BP EXPLORATION (ALASKA)
LOGGING COMPANY: WESTERN ATLAS
TAPE CREATION DATE: 4-AUG-98
JOB ~ER: 98396
LOGGING ENGINEER: RECK
OPERATOR WITNESS: L HINKEL
SURFACE LOCATION
SECTION: 27
TOWNSHIP: 13N
RANGE: 10E
FNL:
FSL: 1956
FEL: 3439
FWL:
ELEVATION (FT FROM MSL O)
KELLY BUSHING:
DERRICK FLOOR: 58.60
GROUND LEVEL: 29.60
WELL CASING RECORD
OPEN HOLE CASING DRILLERS CASING
BIT SIZE (IN) SIZE (IN) DEPTH (FT) WEIGHT (LB/FT)
1ST STRING 7. 000 7404.0 26. O0
2ND STRING
3RD STRING
PRODUCTION STRING
CURVE SHIFT DATA - ALL PASSES TO STANDARD (MEASURED DEPTH)
LIS Tape Verification Listing
Schlumberger Alaska Computing Center
4-AUG-1998 10:57
BASELINE CURVE FOR SHIFTS
LDWG TOOL CODE:
LDWG CURVE CODE:
RUN NUFiBER :
PASS NUMBER:
DATE LOGGED:
LOGGING COMPANY:
.......... EQUIVALENT UNSHIFTEDDEPTH ..........
BASELINE DEPTH
$
THIS FILE CONTAINS THE CASED HOLE GENERAL CURVES FROM
THE SBT LOG WESTERN ATLAS RAN ON BP EXPLORATION'S
MPG-13 WELL. THIS LOG IS THE PDC.
$
PAGE:
**** FILE HEADER ****
FILE NAME : EDIT .001
SERVICE : FLIC
VERSION : 00lCO1
DATE : 98/08/ 4
MAX REC SIZE : 1024
FILE TYPE : LO
LAST FILE :
FILE HEADER
FILE NUMBER: 1
EDITED CURVES
Depth shifted and clipped curves for each pass in separate files.
PASS ~ER : 1
DEPTH INCRE~iENT: 0.5000
FILE SUMMARY
LDWG TOOL CODE START DEPTH STOP DEPTH
CET 7248.0 4966.0
$
CURVE SHIFT DATA - PASS TO PASS (MEASURED DEPTH)
BASELINE CURVE FOR SHIFTS
LDWG CURVE CODE:
PASS NUMBER:
BASELINE DEPTH
$
.......... EQUIVALENT UNSHIFTEDDEPTH ..........
CET
.......
REMARKS: THIS FILE CONTAINS THE CLIPPED MAIN PASS DATA.
$
LIS Tape Verification Listing
Schlumberger Alaska Computing Center
4-AUG-1998 10:57
PAGE: 3
LIS FORMAT DATA
** DATA FORMAT SPECIFICATION RECORD **
** SET TYPE - 64EB **
..............................
TYPE REPR CODE VALUE
1 66 0
2 66 0
3 73 24
4 66 1
5 66
6 73
7 65
8 68 0.5
9 65 FT
11 66 42
12 68
13 66 0
14 65 FT
15 66 68
16 66 1
0 66 0
** SET TYPE - CHAN **
NAME SERV UNIT SERVICE API API API API FILE NUMB NUMB SIZE REPR PROCESS
ID ORDER # LOG TYPE CLASS MOD NUMB SAMP ELEM CODE (HEX)
DEPT FT 194620 O0 000 O0 0 1 1 1 4
GRCH CET GAPI 194620 O0 000 O0 0 1 1 1 4
CCL CET V 194620 O0 000 O0 0 1 1 1 4
TENS CET LB 194620 O0 000 O0 0 1 1 1 4
RB1 CET DEG 194620 O0 000 O0 0 1 1 1 4
DEV CET DEG 194620 O0 000 O0 0 1 1 1 4
68 0000000000
68 0000000000
68 0000000000
68 0000000000
68 0000000000
68 0000000000
** DATA **
DEPT. 7248.000 GRCH. CET 61.820 CCL.CET
RBi. CET 68.782 DEV. CET 44.342
DEPT. 4966.000 GRCH. CET 57.706 CCL.CET
RBi. CET 0.000 DEV. CET 0.000
50.000 TENS.CET
11.000 TENS.CET
2350.668
3000.000
** END OF DATA **
LIS Tape Verification Listing
Schlumberger Alaska Computing Center
4-AUG-1998 10:57
PAGE:
**** FILE TRAILER ****
FILE NA~E : EDIT .001
SERVICE : FLIC
VERSION · O01CO1
DATE : 98/08/ 4
MAX REC SIZE : 1024
FILE TYPE : LO
LAST FILE
**** FILE HEADER ****
FILE NAM~ : EDIT .002
SERVICE : FLIC
VERSION : O01CO1
DATE : 98/08/ 4
MAX REC SIZE : 1024
FILE TYPE : LO
LAST FILE :
FILE HEADER
FILE NUAIBER: 2
EDITED CURVES
Depth shifted and clipped curves for each pass in separate files.
PASS NUMBER: 2
DEPTH INCREMEIVT: 0.5000
FILE SU~E~ARY
LDWG TOOL CODE START DEPTH STOP DEPTH
CET 7248.0 7004.5
$
CURVE SHIFT DATA - PASS TO PASS (FiEASURED DEPTH)
BASELINE CURVE FOR SHIFTS
LDWG CURVE CODE:
PASS NUFIBER:
BASELINE DEPTH
$
.......... EQUIVALENT UNSHIFTEDDEPTH ..........
CET
.......
REMARKS: THIS FILE CONTAINS THE EDITED REPEAT PASS DATA.
$
LIS FORMAT DATA
LIS Tape Verification Listing
Schlumberger Alaska Computing Center
4-AUG-1998 10:57
PAGE: 5
** DATA FORMAT SPECIFICATION RECORD **
** SET TYPE - 64EB **
TYPE REPR CODE VALUE
..............................
1 66 0
2 66 0
3 73 24
4 66 1
5 66
6 73
7 65
8 68 0.5
9 65 FT
11 66 42
12 68
13 66 0
14 65 FT
15 66 68
16 66 1
0 66 1
** SET TYPE - CHAN **
NA~E SERV UNIT SERVICE API API API API FILE NUMB NUMB SIZE REPR PROCESS
ID ORDER # LOG TYPE CLASS MOD NUMB SAMP ELEM CODE (HEX)
DEPT FT 194620 O0 000 O0 0 2 1 1 4 68 0000000000
GRCH CET GAPI 194620 O0 000 O0 0 2 1 1 4 68 0000000000
CCL CET V 194620 O0 000 O0 0 2 1 1 4 68 0000000000
TENS CET LB 194620 O0 000 O0 0 2 1 1 4 68 0000000000
RB1 CET DEG 194620 O0 000 O0 0 2 1 1 4 68 0000000000
DEV CET DEG 194620 O0 000 O0 0 2 1 1 4 68 0000000000
** DATA **
DEPT. 7248. 000 GRCH. CET 58. 038 CCL. CET
RB1. CET 51. 519 DEV. CET 43.917
DEPT. 7022. 000 GRCH. CET 53. 348 CCL. CET
RB1 . CET O. 000 DEV. CET O. 000
50.000 TENS.CET 2345.619
0.000 TENS.CET 3000.000
** END OF DATA **
LIS Tape Verification Listing
Schlumberger Alaska Computing Center
4-AUG-1998 10:57
PAGE:
**** FILE TRAILER ****
FILE NA~iE : EDIT .002
SERVICE · FLIC
VERSION : O01CO1
DATE · 98/08/ 4
MAX REC SIZE : 1024
FILE TYPE : LO
LAST FILE :
**** FILE HEADER ****
FILE NAME : EDIT .003
SERVICE : FLIC
VERSION : O01CO1
DATE : 98/08/ 4
MAX REC SIZE : 1024
FILE TYPE : LO
LAST FILE :
FILE HEADER
FILENUM~ER 3
RAW CURVES
Curves and log header data for each pass in separate files; raw background pass in last file
PASS AU3M~ER: 1
DEPTH INC~: 0.2500
FILE SUF~Uh~Y
VENDOR TOOL CODE START DEPTH STOP DEPTH
.....................................
7248.0 4966.0
SBT
$
LOG HF_J~ER DATA
DATE LOGGED:
SOFTWARE VERSION:
TIf4~ LOGGER ON BOTTOM:
TD DRILLER (FT) :
TD LOGGER (FT) :
TOP LOG INTERVAL (FT) :
BOTTOM LOG INTERVAL (FT) :
LOGGING SPEED (FPHR) :
DEPTH CONTROL USED (YES/NO) :
TOOL STRING (TOP TO BOTTOM)
VENDOR TOOL CODE TOOL TYPE
GR GAM~A RAY
SBT SEGME1TTED BOND
$
BOREHOLE AND CASING DATA
OPEN HOLE BIT SIZE (IN):
03-JUN-98
JO01 VERi.1
7320.0
4966.0
7248.0
TOOL NUMBER
...........
GR 1309XA
SBT 1424XA
LIS Tape Verification Listing
Schlumberger Alaska Computing Center
4-AUG-1998 10:57
PAGE:
DRILLERS CASING DEPTH (FT) :
LOGGERS CASING DEPTH (FT) :
7404.0
BOREHOLE CONDITIONS
FLUID TYPE:
FLUID DENSITY (LB/G):
SURFACE TEMPERATURE (DEGF) '.
BOTTOM HOLE TEMPERATURE (DEGF) :
FLUID SALINITY (PPM) :
FLUID LEVEL (FT) :
FLUID RATE AT WELLHEAD (BPM) :
WATER CUTS (PCT) :
GAS~OIL RATIO:
CHOKE (DEG) :
BRINE
NEUTRON TOOL
TOOL TYPE (EPITHERMAL OR THERMAL):
MATRIX:
MATRIX DENSITY:
HOLE CORRECTION (IN):
BLUELINE COUNT RATE NORMALIZATION IN OIL ZONE
TOP NORMALIZING WINDOW (FT) :
BASE NORMALIZING WINDOW (FT):
BLUELINE COUNT RATE SCALES SET BY FIELD ENGINEER
FAR COUNT RATE LOW SCALE (CPS):
FAR COUNT RATE HIGH SCALE (CPS):
NEAR COUNT RATE LOW SCALE (CPS):
NEAR COUNT RATE HIGH SCALE (CPS):
TOOL STANDOFF (IN):
LOG WAS RUN WITHMARKEDLINEFOR PRIMARY DEPTH
CONTROL.
REFERENCE LOG MWDDATED 16-JUL-97 THROUGH 18-JUL-97.
CEMENT COMPRESSIVE STRENGTH = 2000 PSI ASSUMED.
CEMENT DATA:
MIXED AND PUMPED CEMENT: 359 SX PERMAFROST "E" 12.0 PPG
CEMF2VTADDITIVES: 0.3 LB/SX CELLO-FLAKE
MIXED AND PUMPED CEMENT: 130 SX PREMIUM "G" 13.1 PPG
CEF~F_~VTADDITIVES: 0.15 LB/SX CELLO-FLAKE
0.20~ CFR-3
0.75~ HALAD 344
0.1 LB/SX SUPER CBL
15 LB/SX SILICALITE
THIS FILE CONTAINS THE RAW DATA FOR THE MAIN PASS.
$
LIS FORMAT DATA
LIS Tape Verification Listing
Schlumberger Alaska Computing Center
4-AUG-1998 10:57
PAGE: 8
** DATA FORMAT SPECIFICATION RECORD **
** SET TYPE - 64EB **
..............................
TYPE REPR CODE VALUE
1 66 0
2 66 0
3 73 32
4 66 1
5 66
6 73
7 65
8 68 0.25
9 65 FT
11 66 32
12 68
13 66 0
14 65 FT
15 66 68
16 66 1
0 66 1
** SET TYPE - CHAN **
NAME SERV UNIT SERVICE API API API API FILE NUMB NUMB SIZE REPR PROCESS
ID ORDER # LOG TYPE CLASS MOD NUMB SAMP EL~ CODE (HEX)
.......................................................................................
DEPT FT 194620 O0 000 O0 0 3 1 1 4 68 0000000000
GR SBT GAPI 194620 O0 000 O0 0 3 1 1 4 68 0000000000
CCL SBT V 194620 O0 000 O0 0 3 1 1 4 68 0000000000
TTENSBT LB 194620 O0 000 O0 0 3 1 1 4 68 0000000000
TEN SBT 194620 O0 000 O0 0 3 1 1 4 68 0000000000
SPD SBT F/HR 194620 O0 000 O0 0 3 1 1 4 68 0000000000
RB SBT DEG 194620 O0 000 O0 0 3 1 1 4 68 0000000000
DEV SBT DEG 194620 O0 000 O0 0 3 1 1 4 68 0000000000
** DATA **
DEPT.
TEN. SBT
7248.000 GR.SBT 61.820 CCL.SBT
478.890 SPD.SBT 1499.850 RB.SBT
DEPT. 4966.000 GR.SBT 57.706 CCL.SBT
TEN. SBT -500.000 SPD.SBT 0.000 RB.SBT
50.000 TTEN. SBT 2350.668
68.782 DEV. SBT 44.342
11.000 TTEN. SBT 3000.000
0.000 DEV. SBT 0.000
** END OF DATA **
LIS Tape Verification Listing
Schlumberger Alaska Computing Center
4-AUG-1998 10:57
PAGE:
**** FILE TRAILER ****
FILE NAME : EDIT .003
SERVICE : FLIC
VERSION : O01CO1
DATE : 98/08/ 4
MAX REC SIZE : 1024
FILE TYPE : LO
LAST FILE :
**** FILE HEADER ****
FILE NAME : EDIT .004
SERVICE : FLIC
VERSION : O01CO1
DATE : 98/08/ 4
MAX REC SIZE : 1024
FILE TYPE : LO
LAST FILE :
FILE~ER
FILE NUMBER 4
RAW CURVES
Curves and log header data for each pass in separate files; raw background pass in last file
PASS NUMBER: 2
DEPTH INCREFiENT: 0.2500
FILE SUF2W~ARY
VENDOR TOOL CODE START DEPTH
SBT 7248.0
$
LOG HEADER DATA
DATE LOGGED:
SOFTWARE VERSION:
TIME LOGGER ON BOTTOM:
TD DRILLER (FT) :
TD LOGGER (FT) :
TOP LOG INTERVAL (FT) :
BOTTOM LOG INTERVAL (FT) :
LOGGING SPEED (FPHR) :
DEPTH CONTROL USED (YES/NO):
TOOL STRING (TOP TO BOTTOM)
VENDOR TOOL CODE TOOL TYPE
GR GAM~A RAY
SBT SEGMENTED BOND
$
BOREHOLE AND CASING DATA
OPEN HOLE BIT SIZE (IN) :
STOP DEPTH
..........
7004.3
03-JUN-98
JO01 VERI.1
7320.0
4966.0
7248.0
TOOL ~ER
GR 1309XA
SBT 1424XA
LIS Tape Verification Listing
Schlumberger Alaska Computing Center
4-AUG-1998 10:57
PAGE:
10
DRILLERS CASING DEPTH (FT) :
LOGGERS CASING DEPTH (FT):
7404.0
BOREHOLE CONDITIONS
FLUID TYPE:
FLUID DENSITY (LB/G):
SURFACE TEMPERATURE (DEGF) :
BOTTOM HOLE TEMPERATURE (DEGF) :
FLUID SALINITY (PPM) :
FLUID LEVEL (FT) :
FLUID RATE AT WELLHEAD (BPM) :
WATER CUTS (PCT) :
GAS~OIL RATIO:
CHOKE (DEG) :
BRINE
NEUTRON TOOL
TOOL TYPE (EPITHERMAL OR THERMAL):
MATRIX:
MATRIX DENSITY:
HOLE CORRECTION (IN) '.
BLUELINE COUNT RATE NORMALIZATION IN OIL ZONE
TOP NORMALIZING WINDOW (FT) :
BASE NORMALIZING WINDOW (FT) :
BLUELINE COUNT RATE SCALES SET BY FIELD ENGINEER
FAR COUNT RATE LOW SCALE (CPS):
FAR COUNT RATE HIGH SCALE (CPS):
NEAR COUNT RATE LOW SCALE (CPS):
A~AR COUNT RATE HIGH SCALE (CPS):
TOOL STANDOFF (IN):
LOG WAS RUN WITH MARKED LINE FOR PRIMARY DEPTH
CONTROL.
REFERENCE LOG MWD DATED 16-JUL-97 THROUGH 18-JUL-97.
CEMENT COMPRESSIVE STRENGTH = 2000 PSI ASSUMED.
CEMENT DATA:
MIXED AND PUMPED CEMENT: 359 SX PERMAFROST "E" 12.0 PPG
CEF~_2VT ADDITIVES: 0.3 LB/SX CELLO-FLAKE
MIXED AND PUMPED CEMENT: 130 SX PREMIUM "G" 13.1 PPG
CEMENT ADDITIVES: 0.15 LB/SX CELLO-FLAKE
0.20~ CFR-3
O . 7 5 ~ H3kLAD 344
0.1 LB/SX SUPER CBL
15 LB/SX SILICALITE
THIS FILE CONTAINS THE RAW DATA FOR THE REPEAT PASS.
$
LIS FORMAT DATA
LIS Tape Verification Listing
Schlumberger Alaska Computing Center
4-AUG-1998 10:57
PAGE: 11
** DATA FORMAT SPECIFICATION RECORD **
** SET TYPE - 64EB **
TYPE REPR CODE VALUE
1 66 0
2 66 0
3 73 32
4 66 1
5 66
6 73
7 65
8 68 0.25
9 65 FT
11 66 32
12 68
13 66 0
14 65 FT
15 66 68
16 66 1
0 66 1
** SET TYPE - CHAN **
NAME SERV UNIT SERVICE API API API API FILE NUMB NUMB SIZE REPR PROCESS
ID ORDER # LOG TYPE CLASS MOD NUNiB SAMP ELE~ CODE (HEX)
DEPT FT 194620 O0 000 O0 0 4 1 1 4 68 0000000000
GR SBTGAPI 194620 O0 000 O0 0 4 1 1 4 68 0000000000
CCL SBT V 194620 O0 000 O0 0 4 1 1 4 68 0000000000
TTENSBT LB 194620 O0 000 O0 0 4 1 1 4 68 0000000000
TEN SBT 194620 O0 000 O0 0 4 1 1 4 68 0000000000
SPD SBT F/HR 194620 O0 000 O0 0 4 1 1 4 68 0000000000
RB SBT DEG 194620 O0 000 O0 0 4 1 1 4 68 0000000000
DEV SBT DEG 194620 O0 000 O0 0 4 1 1 4 68 0000000000
** DATA **
DEPT.
TEN. SBT
7248.000 GR.SBT 58.038 CCL.SBT
443.733 SPD.SBT 1499.850 RB.SBT
DEPT. 7004.250 GR.SBT 0.000 CCL.SBT
TEN. SBT -500.000 SPD.SBT 0.000 RB.SBT
50.000 TTEN. SBT 2345.619
51.519 DEV. SBT 43.917
0.000 TTEN. SBT 3000.000
0.000 DEV. SBT 0.000
** END OF DATA **
LIS Tape Verification Listing
Schlumberger Alaska Computing Center
4-AUG-1998 10:57
PAGE: 12
**** FILE TRAILER ****
FILE NA~IE : EDIT .004
SERVICE : FLIC
VERSION : O01CO1
DATE : 98/08/ 4
MAX REC SIZE : 1024
FILE TYPE : LO
LAST FILE :
**** TAPE TRAILER ****
SERVICE NAM~ : EDIT
DATE : 98/08/ 4
ORIGIN : FLIC
TAPE NAME : 98396
CONTINUATION # : 1
PREVIOUS TAPE :
CO~ : BP EXPLORATION, MPG-13, MILNE POINT, API# 50-029-22782-00
**** REEL TRAILER ****
SERVICE NAM~ : EDIT
DATE : 98/08/ 4
ORIGIN · FLIC
REEL NAME : 98396
CONTINUATION # :
PREVIOUS REEL :
COfZ~IE~T : BP EXPLORATION, MPG-13, MILNE POINT, API# 50-029-22782-00
Sperry-Sun'Drilling Services
LIS Scan Utility
Fri Sep 12 10:19:56 1997
Reel Header
Service name ............. LISTPE
Date ..................... 97/09/12
Origin .................... STS
Reel Name ................ UNKNOWN
Continuation Number ...... 01
Previous Reel Name ....... UNKNOWN
Comments ................. STS LIS Writing
Technical Services
Library.
Tape Header
Service name ............. LISTPE
Date ..................... 97/09/12
Origin ................... STS
Tape Name ................ UNKNOWN
Continuation Number ...... 01
Previous Tape Name ....... UNKNOWN
Comments ................. STS LIS Writing
Technical Services
Library.
Physical EOF
Comment Record
TAPE HEADER
MILNE POINT UNIT
MWD/MAD LOGS
WELL NAME:
API NUMBER:
OPERATOR:
LOGGING COMPANY:
TAPE CREATION DATE:
JOB DATA
JOB NUMBER:
LOGGING ENGINEER:
OPERATOR WITNESS:
SURFACE LOCATION
SECTION:
TOWNSHIP:
RANGE:
FNL:
FSL:
FEL:
FWL:
ELEVATION (FT FROM MSL 0)
KELLY BUSHING:
DERRICK FLOOR:
GROUND LEVEL:
MWD RUN 2
AK-MM-70204
PIEPER
ANGLEN
Date 0t,- 03_ OI
MPG-13
500292278200
BP EXPLORATION
SPERRY-SUN
12-SEP-97
27
13N
10E
1956
3439
.00
58.60
29.60
Scientific
Scientific
(ALASKA) , INC.
DRILLING SERVICES
RECEIVED
SEP '1 7 ~997
Alasks Oil & Gas ,~s, C:emmJs~o!~,
Anchorage
WELL CASING RECORD
1ST STRING
2ND STRING
3RD STRING
PRODUCTION STRING
REI~RK S:
OPEN HOLE CASING DRILLERS
BIT SIZE (IN) SIZE (IN) DEPTH (FT)
20.000 112.0
8.500 7421.0
1. ALL DEPTHS ARE MEASURED DEPTHS {MD) UNLESS OTHERWISE
NOTED.
2. MWD RUN #1 IS DIRECTIONAL ONLY AND IS NOT PRESENTED.
3. MWD RUN #2 IS DIRECTIONAL WITH DUAL GAMMA RAY (DGR)
UTILIZING GEIGER-
MUELLER TUBE DETECTORS, AND ELECTROMAGNETIC WAVE
RESISTIVITY PHASE-4 (EWR4)
4. DEPTH SHIFTING/CORRECTION OF MWD DATA IS WAIVED AS
PER THE PHONE
CONVERSATION BETWEEN MARK VANDERGON OF BP EXPLORATION
(ALASKA), INC.
AND ALI TURKER OF SPERRY-SUN DRILLING SERVICES ON
09/08/97.
5. THIS WELL REACHED A TOTAL DEPTH (TD) OF 7421'MD,
4496'TVD.
SROP = SMOOTHED RATE OF PENETRATION WHILE DRILLING.
SGRC = SMOOTHED GAMMA RAY COMBINED.
SEXP = SMOOTHED PHASE SHIFT-DERIVED RESISTIVITY
(EXTRA-SHALLOW SPACING).
SESP = SMOOTHED PHASE SHIFT-DERIVED RESISTIVITY
(SHALLOW SPACING).
SEMP = SMOOTHED PHASE SHIFT-DERIVED RESISTIVITY (MEDIUM
SPACING).
SEDP = SMOOTHED PHASE SHIFT-DERIVED RESISTIVITY (DEEP
SPACING).
SFXE = SMOOTHED FORMATION EXPOSURE TIME FOR RESISTIVITY
SENSOR.
$
File Header
Service name ............. STSLIB.001
Service Sub Level Name...
Version Number ........... 1.0.0
Date of Generation ....... 97/09/12
Maximum Physical Record..65535
File Type ................ LO
Previous File Name ....... STSLIB.000
Comment Record
FILE HEADER
FILE NUMBER: 1
EDITED MERGED MWD
Depth shifted and clipped curves; all bit runs merged.
DEPTH INCREMENT: .5000
FILE SUMMARY
PBU TOOL CODE START DEPTH
FET 4475.0
RPD 4475.0
RPM 4475.0
RPS 4475.0
RPX 4475.0
STOP DEPTH
7363.5
7363.5
7363.5
7363.5
7363.5
GR 4482.0 7371.0
RO? 4532.5 7421.0
$
BASELINE CURVE FOR SHIFTS:
CURVE SHIFT DATA (MEASURED DEPTH)
EQUIVALENT UNSHIFTED DEPTH
BASELINE DEPTH
$
MERGED DATA SOURCE
PBU TOOL CODE BIT RUN NO MERGE TOP MERGE BASE
I~D 2 4532.0 7421.0
$
REMARKS: MERGED MAIN PASS.
$
Data Format Specification Record
Data Record Type .................. 0
Data Specification Block Type ..... 0
Logging Direction ................. Down
Optical log depth units ........... Feet
Data Reference Point .............. Undefined
Frame Spacing ..................... 60 .liN
Max frames per record ............. Undefined
Absent value ...................... -999.25
Depth Units .......................
Datum Specification Block sub-type...0
Name Service Order Units Size Nsam Rep
DEPT FT 4 1 68
ROP MWD FT/H 4 1 68
GR MWD AAPI 4 1 68
RPX MWD OHM~ 4 1 68
RPS MWD OHMM 4 1 68
RPM MWD OHMM 4 1 68
RPD MWD OHMM 4 1 68
FET MWD HOUR 4 1 68
Code Offset Channel
0 1
4 2
8 3
12 4
16 5
2O 6
24 7
28 8
Name Min Max Mean
DEPT 4475 7421 5948
ROP 14.1156 912.305 229.018
GR 15.5736 112.252 60.7295
RPX 0.9615 80.6947 7.1953
RPS 0.9735 67.6329 7.49948
R?M 0.9607 63.7239 7.27385
RPD 0.9397 56.3699 7.50721
FET 0.1222 10.7901 0.866654
Nsam
5893
5778
5779
5778
5778
5778
5778
5778
First
Reading
4475
4532.5
4482
4475
4475
4475
4475
4475
Last
Reading
7421
7421
7371
7363.5
7363.5
7363.5
7363.5
7363.5
First Reading For Entire File .......... 4475
Last Reading For Entire File ........... 7421
File Trailer
Service name ............. STSLIB.001
Service Sub Level Name...
Version Number ........... 1.0.0
Date of Generation ....... 97/09/12
Maximum Physical Record..65535
File Type ................ LO
Next File Name ........... STSLIB.002
Physical EOF
File Header
Service name ............. STSLIB.002
Service Sub Level Name...
Version Number ........... 1.0.0
Date of Generation ....... 97/09/12
Maximum Physical Record..65535
File Type ................ LO
Previous File Name ....... STSLIB.001
Conunent Record
FILE HEADER
FILE NUMBER: 2
RAW MWD
Curves and log header data for each bit run in separate files.
BIT RUN NUMBER: 2
DEPTH INCREMENT: .5000
FILE SUMMARY
VENDOR TOOL CODE START DEPTH STOP DEPTH
FET 4475.0 7363.5
RPD 4475.0 7363.5
RPM 4475.0 7363.5
RPS 4475.0 7363.5
RPX 4475.0 7363.5
GR 4482.0 7371.0
ROP 4532.5 7421.0
$
LOG HEADER DATA
DATE LOGGED: 17-JUL-97
SOFTWARE
SURFACE SOFTWARE VERSION: 5.06
DOWNHOLE SOFTWARE VERSION: 5.46
DATA TYPE (MEMORY OR REAL-TIME): MEMORY
TD DRILLER (FT): 7421.0
TOP LOG INTERVAL (FT): 4532.0
BOTTOM LOG INTERVAL (FT): 7421.0
BIT ROTATING SPEED (RPM):
HOLE INCLINATION (DEG
MINIMUM ANGLE: 37.4
MAXIMUM ANGLE: 75.6
TOOL STRING (TOP TO BOTTOM)
VENDOR TOOL CODE TOOL TYPE
DGR DUAL GAMMA RAY
EWR4
$
ELECTROMAG. RESIS. 4
BOREHOLE AI~D CASING DATA
TOOL NUMBER
P0771CRG6
P0771CRG6
OPEN HOLE BIT SIZE (IN):
DRILLER'S CASING DEPTH (FT) :
BOREHOLE CONDITIONS I~UD TYPE:
I~JD DENSITY (LB/G):
I~JD VISCOSITY (S) :
MUD PH:
MUD CHLORIDES (PPM) :
FLUID LOSS (C3):
RESISTIVITY (OHMS) AT TEMPERATURE (DEGF)
MUD AT MEASURED TEMPERATURE (MT):
MUD AT MAX CIRCULATING TERMPERATURE:
MUD FILTRATE AT MT:
MUD CAKE AT MT:
NEUTRON TOOL
MATRIX:
MATRIX DENSITY:
HOLE CORRECTION (IN):
TOOL STANDOFF (IN):
EWR FREQUENCY (HZ):
REMARKS:
$
Data Format Specification Record
Data Record Type .................. 0
Data Specification Block Type ..... 0
Logging Direction ................. Down
Optical log depth units ........... Feet
Data Reference Point .............. Undefined
Frame Spacing ..................... 60 .liN
Max fzames per record ............. Undefined
Absent value ...................... -999.25
Depth Units .......................
Datum Specification Block sub-type...0
8.500
8.5
SPUD
9.00
70.0
9.0
8OO
5.2
3.600
2. 600
3.500
3.800
Name Service Order Units Size Nsam Rep Code Offset Channel
DEPT FT 4 1 68 0 1
GR MWD 2 AAPI 4 1 68 4 2
RPX MWD 2 OHP~ 4 1 68 8 3
RPS MWD 2 OHMM 4 1 68 12 4
RPM MWD 2 OHI{M 4 1 68 16 5
RPD MWD 2 OHMH 4 1 68 20 6
ROP MWD 2 FT/H 4 1 68 24 7
FET MWD 2 HOUR 4 1 68 28 8
31.7
First
Name Min Max Mean Nsam Reading
DEPT 4475 7421 5948 5893 4475
GR 15.574 112.252 60.7295 5779 4482
RPX 0.961 80.695 7.19529 5778 4475
RPS 0.974 67.633 7.49948 5778 4475
RPM 0.961 63.724 7.27385 5778 4475
RPD 0.94 56.37 7.50721 5778 4475
ROP 14.116 912.305 229.018 5778 4532.5
Last
Reading
7421
7371
7363.5
7363.5
7363.5
7363.5
7421
FET 0.122 10.79 0.86666 5778
4475 7363.5
First Reading For Entire File .......... 4475
Last Reading For Entire File ........... 7421
File Trailer
Service name ............. STSLIB.002
Service Sub Level Name...
Version Number ........... 1.0.0
Date of Generation ....... 97/09/12
Maximum Physical Record..65535
File Type ................ LO
Next File Name ........... STSLIB.003
Physical EOF
Tape Trailer
Service name ............. LISTPE
Date ..................... 97/09/12
Origin ................... STS
Tape Name ................ UNKNOWN
Continuation Number ...... 01
Next Tape Name ........... UNKNOWN
Comments ................. STS LIS Writing Library.
Technical Services
Reel Trailer
Service name ............. LISTPE
Date ..................... 97/09/12
Origin ................... STS
Reel Name ................ UNKNOWN
Continuation Number ...... 01
Next Reel Name ........... UNKNOWN
Comments ................. STS LIS Writing Library.
Technical Services
Scientific
Scientific
Physical EOF
Physical EOF
End Of LIS File