Alaska Logo
Department of Commerce, Community, and Economic Development
Alaska Oil and Gas Conservation
Commission
Loading...
HomeMy WebLinkAbout197-120 • • bp BP Exploration (Alaska) Inc. Attn: Well Integrity Coordinator, PRB -20 Post Office Box 196612 Anchorage, Alaska 99519 -6612 0 December 30, 2011 Mr. Tom Maunder _ / � 1 4 Alaska Oil and Gas Conservation Commission q� 333 West 7 Avenue Anchorage, Alaska 99501 pG--( 3 Subject: Corrosion Inhibitor Treatments of MPG -Pad Dear Mr. Maunder, Enclosed please find multiple copies of a spreadsheet with a list of wells from MPG -Pad that were treated with corrosion inhibitor in the surface casing by conductor annulus. The corrosion inhibitor is engineered to prevent water from entering the annular space and causing external corrosion that could result in a surface casing leak to atmosphere. The attached spreadsheet represents the well name, API and PTD numbers, top of cement depth prior to filling and volumes of corrosion inhibitor used in each conductor. As per previous agreement with the AOGCC, this letter and spreadsheet serve as notification that the treatments took place and meet the requirements of form 10 -404, Report of Sundry Operations. If you require any additional information, please contact me or my alternate, Gerald Murphy, at 659 -5102. Sincerely, Mehreen Vazir BPXA, Well Integrity Coordinator • • BP Exploration (Alaska) Inc. Surface Casing by Conductor Annulus Cement, Corrosion inhibitor, Sealant Top-off Report of Sundry Operations (10-404) MPG -Pad 10/10/2011 Corrosion Initial top of Vol. of cement Final top of Cement top off Corrosion inhibitor/ Well Name PTD it API # cement pumped cement date inhibitor sealant date r ft bbls ft gal MPG-01 1890290 8 , 50029219270000 Tanko conductor NA NA NA NA NA MPG -02 1890280 50029219260000 Tanko conductor NA NA NA NA NA MPG -03A 2042190 50029219420100 Tanko conductor NA NA NA NA NA MPG -04 1890450 50029219410000 Tanko conductor NA NA NA NA NA MPG -05 1910230 50029221380000 1.1 NA 1.1 NA 5.1 8/14/2011 MPG -07 1910250 50029221400000 0.1 NA 0.1 NA 3.4 9/4/2011 MPG -08A 1930480 50029221410100 0.2 NA 0.2 NA 2.6 10/10/2011 MPG -09 1971170 50029227790000 1.3 NA 1.3 NA 15.3 10/30/2009 MPG -10 1971180 50029227800000 2.1 NA 2.1 NA 20.4 10/30/2009 MPG -11 1971190 50029227810000 0.8 NA 0.8 NA 5.1 8/14/2011 MPG -12 1971420 50029227920000 1.3 NA 1.3 NA 8.5 8/14/2011 *--'� MPG -13 1971200 50029227820000 1.2 NA 1.2 NA 10.2 10/30/2009 MPG -14 2011330 50029230310000 0.8 NA 0.8 NA 4.3 9/4/2011 MPG -15 1971220 50029227840000 2.9 NA 2.9 NA 34.0 10/30/2009 MPG -16 2032100 50029231890000 1.8 NA 1.8 NA 17.0 8/15/2011 MPG -17 2040130 50029231920000 1.6 NA 1.6 NA 14.5 8/15/2011 MPG -18 2040200 50029231940000 1.6 NA 1.6 NA 13.6 8/15/2011 MPG -19 2041920 50029232280000 1.6 NA 1.6 NA 13.6 8/15/2011 11/01/10 SOMberlep NO. 5637 Alaska Data & Consulting Services Company: State of Alaska 2525 Gambell Street, Suite 400 Alaska Oil & Gas Cons Comm Anchorage, AK 99503 -2838 Attn: Christine Shartier ATTN: Beth 333 West 7th Ave, Suite 100 Anchorage, AK 99501 Well Job # Log Description Date BL Color CD MPG43 BCRJ -00038 X -FLOW CHECK/IBPSET RECORD 09115110 1 1 MPS-43 AYKP -00104 SCMT 08/26110 1 1 Pi -09 BCRJ -00036 PRODUCTION PROFILE 09112110 1 1 W -37A BD88 -00048 MEM PRODUCTION PROFILE 09111/10 1 W -31A AZ2F -00064 MEM PRODUCTION PROFILE 09116/10 1 06 -19A AWJI -00112 MEM PRODUCTION PROFILE 09/19/10 1 1 12 -OSAL1 BAUJ -00050 MEM PRODUCTION PROFILE 09/20110 1 1 P1 -16 BCRJ -00049 INJECTION PROFILE 10/06110 1 1 04 -03 BCRD -00059 PRODUCTION PROFILE 09127110 1 1 • P -03A AZ2F -00065 MEM INJECTION PROFILE / 10106/10 1 1 G -198 AWJI -00114 MEM PRODUCTION PROFILE 10/04/10 1 1 Y -36 BD88.00058 M E M G LS 10/09110 1 1 3- 03IJ -33 BCZ2 -00025 PRODUCTION PROFILE J 09/11110 1 1 L -214A BAUJ -00043 MEM INJECTION PROFILE — 09113110 1 i H -0 AWJI -00118 MEM PRODUCTION PROFILE 10114110 1 1 16.068 BBUO -00023 PRODUCTION PROFILE BP CORRECTION 06108110 1 1 H -38 AZ2F -00068 MEM PRODUCTION PROFILE — 10/16/10 1 1 P2-44 BCRD -00063 PRODUCTION PROFILE 10/15110 1 6 1 8 -138 AYKP -00091 CH EDIT PDC -GR (SCMT) 07/02/10 1 02.228 IOAKA0069 OH MWD /LWD EDIT 07107110 2 1 W -196 6CRJ -00034 CH EDIT PDC -GR (SCMT) 09/07110 1 1 OWDWSE APBPD3WELL FIST REDO - PRINTS 09123110 1 OWDW -NW BBSK -00033 RST 09124/10 1 1 PLEASE ACKNOWLEDGE RECEIPT BY SIGNING AND RETURNING ONE COPY EACH TO: BP Exploration (Alaska) Inc. Alaska Data & Consulting Services Petrotechnical Data Center LR2 -1 2525 Gambell Street, Suite 400 900 E. Benson Blvd. Anchorage, AK 99503 -2838 Nov Y . a o0'0?' MEMORANDUM State of Alaska Alaska Oil and Gas Conservation Commission TO: Jim Re DATE: Tuesday, October 19, 2010 P.I. Sup ervisor �(� QI I +vl 1� SUBJECT: Mechanical Integrity Tests BP EXPLORATION (ALASKA) INC G -13 FROM: John Crisp MILNE PT UNIT SB G -13 Petroleum Inspector Src: Inspector Reviewed By: P.I. Supry T r= NON - CONFIDENTIAL Comm Well Name: MILNE PT UNIT SB G -13 API Well Number 50- 029 - 22782 -00 -00 Inspector Name: John Crisp Insp Num: mitJCr101017193741 Permit Number: 197 -120 -0 Inspection Date: 10/15/2010 Rel Insp Num: Packe Depth Pretest Initial 15 Min. 30 Min. 45 Min. 60 Min. Well i G -13 ' Type Inj. V✓ TVD 3903 IA 150 2000 1930 1920 P .T.D 1971200s Ty peTest s PT Test psi 1500 OA In terval 4YRTST P/` I/ P Tubing 1200 1200 1200 1200 Notes: Monobore Injector. 1.4 bbl pumped for test. NOV i II I I I Tuesday, October 19, 2010 Page I of 1 l _ ;, PROACTIVE DIAGNOSTIC SERVICES, INC. ELL LOG TRA/1/SM/TTAL To: AOGCC Christine Mahnken 333 W. 7th Ave Suite 100 Anchorage, Alaska 99501 (907) 793-1225 RE : Cased Hole/Open Hole/Mechanical Logs and /or Tubing Inspection(Caliper / MTT) The technical data listed below is being submitted herewith. Please acknowledge receipt by returning a signed copy of this transmittal letter to the following BP Exploration (Alaska), Inc. Petrotechnical Data Center Attn: Joe Lastufka LR2-1 900 Benson Blvd. Anchorage, Alaska 99508 and •> ProActive Diagnostic Services, Inc. l 9 ~ ~j Attn: Robert A. Richey 130 West International Airport Road Suite C Anchorage, AK 99518 Fax: (907) 245-8952 ~ 1) 2) injection Profile 27-Jun-10 MPU G13 Injection Profile 29-Jun-10 MPU E-29 Signed Print Name: Date ~' rr~^^i PROACTIVE DIAGNOSTIC SERVICES, INC., 130 W. INTERNATIONAL AIRPORT RD SUITE C, ANCHORAGE, AK 99518 PHONE: (907)245-8951 FAX: {907)245-88952 E-MAIL : ~dsarachorageCa7rrleralorylog.~:om WEBSITE : ~nnnrw.sTterraorvlog.com BL /EDE 50-029-22782-00 ;, BL/ EDE. ~ '~ -- C:\Documents and SettingslDiane Williams\Desktop\Transmit BP.docx ~ • ~~~ ~~ C - ~` 4 k S~ ~~~ €~t~ ~r ~ ~r 4a I li;~ ~r I, t / ~/, 4~~ ~ r. 1 5' },F ~ ~1 } P u{ 6 ! t rv7 ~ ~ ~ ~ ~e k k H~ t ~ ~ ~,.~ ~ ~ ~ '~' l ~ ~ F k ~~ ! 4. E ' p. ( Z ~" ` ~ ~~ ~~ p ~ ~< ~ ~ ~ ~ ~t ~ k`11 SEAN PARNELL, GOVERNOR G` ~,~~ Y ; t ' E u ~~ G j a ~~";y =~ ~~~ ~_"~~u~ ~ ~ Nu ~ ~ ~, ~v~~ ~ v`_ ~ ~ ~~ f< ,~ ~+ ~+,~~ ~A-7~~ OITi ~~ tu~a7 3'~ 333 W. 7th AVENUE, SUITE 100 CO1~T5ER~ATIOrIT COMl-IISSIOI~T ~ ANCHORAGE, ALASKA 99501-3539 PHONE (907) 279-1433 J FAX (907)276-7542 ~' Mr. Chidiebere Igbokwe Production Engineer BP Exploration (Alaska), Inc. ~ P.O. Box 196612 ~ ~.. Anchorage, AK 99519-6612 (,~~~ ~ ~ Re: Milne Point Unit Field, Schrader Bluff Fool, MPG-13 Sundry Number: 309-353 Dear Mr. Igbokwe: ~~~~~~~~~~ °°~!~`~' ;~ f~~. 2~C9 Enclosed is the approved Application for Sundry Approval relating to the above referenced well. Please note the conditions of approval set out in the enclosed form. When providing notice for a representative of the Commission to witness any required test, contact the Commission's petroleum field inspector at (907) 659-3607 (pager). As provided in AS 31.05.080, within 20 days after written notice of this decision, or such further time as the Commission grants for good cause shown, a person affected by it may file with the Commission an application for rehearing. A request for rehearing is considered timely if it is received by 4:30 PM on the 23rd day following the date of this letter, or the next working day if the 23rd day falls on a holiday or weekend. A person may not appeal a Comtnission decision to Superior Court unless rehearing has been requested. Sincerely, Daniel T. Seamount, Jr. ~ Chau- DATED this Z-`~ day of October, 2009 Encl. (, ~'~~ ~' ,~y~I~D- I STATE OF ALASKA ~~tit ~ ALASl~L AND GAS CONSERVATION COMMISSI• ~° APPLICATION FOR SUNDRY APPROVALS ~n aac: ~~ ~Rn ~~~~~~~~ ~c~ ~ o ~oa~ ~.__c__ ~w:e ~: ~t'!e.~ ~"nn~ ~:11t11P111S~~0f1 1. Type of Request: Abandon ^ Suspend ^ Operational shutdown ^ Perforate ^ Re-en er uspend~ ~ ~~r Alter casing ^ Repair well ^ Plug PerForations ^ Stimulate ^ Other Q• Specify Change approved program ^ Puli Tubing ^ Pertorate New Pool [] Time Extension ^ SET IBP • 2. Operator Name: 4. Current Well Class: 5. Permit to Drill Number: BP Exploration (Alaska), inc. Development ~ Exploratory ~ 197-1200 - 3. Address: P.O. Box 196612 Stratigraphic ~ Service ~. 6. API Number: Anchorage, AK 99519-6612 50-029-22782-00-00 . 7. If perforating, closest approach in pool(s) opened by this operation to nearest 8. Well Name and Number: property line where ownership or landownership changes: Spacing Exception Required? Yes ^ No ^ MPG-13 . 9. Property Designation (Lease Number): 10. Field/Pool(s): ADLO-025516 , MILNE POINT UNIT Field / SCHRADER BLUFF Pool . 11. PRESENT WELL CONDITION SUMMARY Total Depth MD (ft): Total Depth ND (ft): Effective Depth MD (ft): Effective Depth ND (ft): Plugs (measured): Junk (measured): 7421 . 4495.95 , 7292 4393 NONE NONE Casing Length Size MD ND Burst Collapse Structural Conductor 110 20" 91.4# H-40 32 110 32 110 1490 470 Surface Intermediate Production 7404 7" 26# L-80 31 7404 31 4482 7240 5410 Liner Perforation Depth MD (ft): Perforation Depth TVD (ft): Tubing Size: Tubing Grade: Tubing MD (ft): SEE ATTACHED - - 3.1/2" 9.2# L-80 SURFACE - 6725' Packers and SSSV Tvqe: 7" BAKER S-3 PKR Packers and SSSV MD and ND (ft): 6658' 3903' 12. Attachments: Description Summary of Proposal Q 13. Well Class after proposed work: Detailed Operations Program ^ BOP Sketch ^ Exploratory ^ Development ^ Service ^~ _ 14. Estimated Date for 15. Well Status after proposed work: Commencing Operations: 11/2/2009 Oil ^ Gas ^ WDSPL ^ Plugged ^ 16. Verbal Approval: Date: WINJ ^~ ` GINJ ^ WAG ^ Abandoned ^ Commission Representative: GSTOR ^ SPLUG ^ 17. I hereby certify that the foregoing is true and correct to the best of my knowledge. Contact Chidiebere Igbokwe P~inted Name Chidiebere Igbokwe Title P E Signatur Phone Date 564-4795 10/19/2009 Prepared by Gary Preble 564-4944 COMMISSION USE ONLY Conditions of approval: Notify Commission so that a representative may witness Sundry Number. `~~/ /~~3 Plug Integrity ^ BOP Test ^ Mechanical Integrity Test ^ Location Clearance ^ Other: Subsequent Form Required: l • yo`-~ APPROVED BY COMMISSIONER THE COMMISSION A r v d b Date: l~ l Z~ ~ pp o e y: v ~ ~ ~~ ~RiGINA ~U-z~o~ L Form 10-403 Revised 07/2009 ..- :,.~~~ .~-- ~- f~~~~ 5~~~~,~ MPG-13 197-120 PERF OTTACHMENT • Sw Name Operation Date Perf Operation Code Meas Depth Top Meas Depth Base Tvd Depth Top Tvd Depth Base MPG-13 6/8/98 PER 7,094. 7,130. 4,237.87 4,266.03 MPG-13 6/8/98 PER 7,190. 7,224. 4,313.11 4,339.88 MPG-13 12/2/02 FIL 7,134. 7,321. 4,269.16 4,416.57 MPG-13 2/11/08 APF 6,922. 6,940. 4,104.14 4,118.08 AB ABANDONED PER PERF APF ADD PERF RPF REPERF BPP BRIDGE PLUG P ULLED SL SLOTTED LINER BPS BRIDGE PLUG SET SPR SAND PLUG REMOVED FCO FILL CLEAN OUT SPS SAND PLUG SET FIL FILL SQF SQUEEZE FAILED MIR MECHANICAL ISOLATED REMOVED SQZ SQUEEZE MIS MECHANICAL ISOLATED STC STRADDLE PACK, CLOSED fVILK MECHANICAL LEAK STO STRADDLE PACK, OPEN OH OPEN HOLE • . C~ bp BP Exploration Alaska Milne Point To: Jerry Sharp/Mark O'Malley Date: September 10, 2009 MPU Well Operations Supervisor From: Keith Lopez IOR: 60 bopd Tract 14 PE AFE: MSGPDWLI3 Reviewed by Brad Gathman CO5T: $90M (10/14/09) Sub_iect: MPG-13i CTU set IBP OBJECTIVES: Set IBP between the OA and OB perfs to isolate the latter and cap with 15' of Sluggits. ~ PROPOSED STEPS: Category Ste Descri tion C 1 Drift for IBP, Set IBP @ 7173' S 2 Dum bail 15' of Slu its on to of IBP WELL DATA Current Status: On water injection. 727 bwpd @ 1253 psi M~ Deviation: 76 degrees at 3704' MD Min ID: 2.75" at 6713', 6645', and 2289'MD (3-1/2" HES XN Nipple) Last TD tag: 7257' MD on 6/03/09 Last downhole ops: IPROF on 6/03/09 Latest H2S level: N/A - SBL have minimal H2S <10 ppm Latest SBHP: 2876 psi @ 4000'TVDSS 7/24/09 (10 day SBHP) Tbg/csg size: 3.5" tbg, 7" prod liner BACKGROUND MPG-13 is a Schrader N/OA/OB injector supporting MPG-15. MPG-15 is currently producing with cycles of high GOR, but the specific zone that is contributing the majority of the gas is unknown. MPG-15 was worked over in 2006 and perfs were added in the NB sand. Perfs to support this production were not added in the MPG-13 unti12008, so it is possible that the NB is producing at high GOR. Additionally, the last two IPROF's have shown most of the injection going into the OB zone. CURRENT PLAN • • / Current plan is to set an IBP between the OA and OB zones to isolate the latter. This will give us better control over the injection volume into the N and OA sands that are thought to be under pressured and causing the high GOR problems in the MPG-15. A pressure gauge will be hung below the IBP to verify the pressure of the OB and the plug will be capped with 20' of Sluggits. This change in injection conformance should result in increased on-time and decreased WC in the MPG-15. The intent of this IBP is to be temporary and to be removed at a later date to continue injection into the OB. Most Recent Downhole Work An IPROF was conducted on 6/3/09 with the initial tag at 7277' (53' of rat hole). Subsequent runs showed that the wellbore did have some Schmoo and gave a shallower tag of 7257' (33' of rat hole). A Schmoo-be-gone treatment was conducted on 6/8/09 to clean up any additional Schmoo in the hole. DETAILED PROCEDURE: CTU 1. MIRU CTU and inspect site. 2. SI well and RIH w/ GR/CCL in carrier w/ 2.5" nozzle for drift assembly for IBP. With well SI, continue to RIH jetting w/ 1°Io slick KCl to 7200' CTMD taking returns up the annulus to a tank. This is to remove Schmoo from wellbore. 3. POOH and flag pipe ~ 7000' MD. Freeze protect w/ 26 bbls of 60/40 MEOH. 4. MU BHA and 2.50" IBP. Hang memory pressure gauge off bottom of IBP set for 1 hour pressure reads (intent is to read long-term trends over a 6 month period). 5. RIH to flag and tie into Western Atlas' Segmented Bond Log dated 6/3/98. Set IBP @ 7173' ELMD. Set IBP per Baker guidelines. 6. RDMO CTU. SL 7. RIH & dump bail 15' of Sluggits on top of IBP @ 7173' MD. 8. RDMO and infarm Pad Operator to put the well back on injection at 500 BWPD ar 1300 psi Max WHP. POINT5 OF CONTACT: Tract 14 Pad Engineer: Keith Lopez Office:564-5718 Ce11:907-903-5432 ~ • ,~ ~rr~an ~ tns^ s~V1 ~;,#x,~ n~n o«~ s~ FMG Csen S, wf i 1'~t 2 7/8" FAAC tb5 hn9• 2-7i8` $rd_ toR ~d bai~orn, 2.5" CNV ~Pt/ pr~ofiMe_ 28" 91_1 ppf, FWa '~12' KOP ~ 5~0' to 3,500 Meat. hofe ar~e = 76 ~g_ h~oie angle lhrxf perfs = 11 de~. 3_5" 9_~t ppf, L~[! EUE rraod TBG {dtiR IQ = 2$~ST, t~. = .fl087 bpf} 7" 26 ppf, L-~D, 8 I'C mc~d pKa~duc~o t~sing ( t~t ID =£.'!51", c~F- = I7_Q383 bp i F~S `X 1lipple ~ I t13' taore_ ~tim~n Summarv P@11~DI'~iO~I- SIAi11if~N ReF loa• ~T d~ted 6r3J9i8 Siae SPF I-~rua6 (7Vfl1 2-~' 0 ~22'-864Q' 49D4'~' 4_5" 5 7i094'-7130' 4238'~: ~1_S' S 7190'-7224' 4313'~4: 2_5° HSO P~-nerjet ctrarr,~es ~ so' PFtasing 4_~ A1P~ ~ ~~ ~ ~ ~9- P~~9 I~A P !-J G -1 ~ o""~-„g_ ~ ~ = s ~'~ t~- ~ RT To Ttx~. Spod = 30.7' (N 22E~ .5" I~S `~ Nipple ~ I _$13" bcx~e_ Baker S-3 padce~ ~ 37a' ~ 5" HE5 XM l~ippie ~T13° .873" bo~, 2_75' ~) WLE~ ~~ 2) T NABI'k,~r jls. 674T~GTb'8' ~ ~ ncset ao~ar ~PBll~l 7 3'~29' I ~~~ 7'~ oiATE F~V. BY 7~-97 14~0 D6T'I SJ96 M. Lirtder ~2-11-t~8 JRP COM~BZTS 7m t~aed Flaie ~ 22E A~c! M1LWE ROIMT tlNiT YVELL No - G-13 API : 9D-A29~T82 BP EXPLaRATlON (AI~ ~ , WELL SERVICE REPC~RT WELL JOB SCOPE UI+~T ~ P~~'~ ~ IPRQF SWCP #02 DATE DAILY W4RN( [lAY ~URV 613I2U09 DRIFTffAG' IhJJECTION PROFILE REA CO~T CODE PLUS KEY RERSON MIGHT SUPV/ MSGPDWL13-R SWCP-PRIDE BYRRS MIN ID t3EPTH TTL SIZE 2.75 " 6713 FT 2.992 " DAILY SUA~~IMMARY 'A'**COtVT. FROM VNSR 6-2-09*** {ipro@ RAN 2.70" CENT, TEL, SAMPLE BAILER, LOC TT ar 6705' SLM(20' CORR. TO 6,725' MD) TAGGED TD ~ 7,271' MD, 53' OF RAT HOLE. RECOVERED 2 GUPS OF SCNdAQD. ATTEMPT TO 4UE 1PROF V+tiPDS IPROF SPINNER TOOLS, UNABLE TO PASS 4,313' SLM. RAN 2.60" CENT, 2.50" SAMPLE B~ILER, TAG TD a~7r 7,257' SLM( ~1I2 SCHM00~. RAN PDS SPINNER IPRdF. AS PER PROG(INJ. RATE 700 & 1000 BWPD) GOOD DATA "*"WELL LEFT INJ. PAD OP NOTIFIED"** L(]G EN TRIES I tut Tb IA (1A -y 1350 920 TIME COMMEPIT 00:01 CONT. FROM WSR 6-02-09 ***'~*"GURRENTLY RU, TS=10' 1-7I8" RS(2.20 tNHEELS), 1-3l4" OJ, K.JT,1-7/8" LS S"***'~" 01:00 PT PCE V+l/ DIESEL 300H-2000H GOOD 01:15 RIH W! 3.70" GENT TEL SAMPLE BAILER LOC. TT 6 705' SLM 6725' MD 04:00 TAGGED TD 7 257' SLM 7 277' MD ...P40H 04:45 OOH REC4VERED 2 CUPS OF SCHM00. 06:00 CIO TO TAYLOR INSPECT LOC PJS~t GO OVER Jd8 SG4PE WlPDS. 06:20 PRESSURE UP LUB W/DIESEL 200 LOW! 1200 HIGH GdOD TEST. 06:34 RIH W12.70" CENT, POS IPROF SPINNER TOOLS (oal 19~. SD ~ 4,313' SLM, STEP UP INJECTION RATE, ATTEMPT FEIN TIMES TO FALL PAST, UNABLE TO PASS THROUGH, CONTACT CO-REP, POOH TO CHECK TOOLS. 08:27 OOH WIT04LS LITTLE TO NO SGHM00 ON TOOLS NO SOLIDS . MAKE UP DRIFT. 09:12 PRESSURE UP LUB W/DIESEL, RIH W! 2.6~" CEP1T, 2.50" SAMPLE BAILER, SL4V+tS D01n1N a~7r 4,313' SLM TO 4 900' SLM ABLE TO KEEP FALUNG TAG TD 7 257' SLM STICKY BTM POOH. 10:12 OOH W(f00LS RECOVERED ~ 1I2 GALLON OF SCHM40, RECOIUFIGURE PDS IPROF T4QLS, PLAGE KJT IN MIDDLE OF TOOLS. 10:47 RIH W12.60" CENT, PDS IPROF SPINNER TOOLS (OAL 19~, ICJT IN THE MIDDLE OF T04L ~10' FROM BOTTaM, TOOLS SLOWED DOWN BETV+tEEN 4 300' 4 900' SLM STEPPED RATE UP TO 1600 bw d& 1650 si . 12:25 STdP a[~7 7,247' SLM, 10' ABOVE TD. FIAG LINE ~a THAT POINT RE-ATTAGH PQS DEPTH B07f, STABiLIZE INJEGTION RATE. 14:10 RATES STABILIZES 680 bw d& 1239 5i BEGIN LOGGING PROGRAM STOP COUNTS . 15:16 STOP COUNTS COMPLETE BEGIN DYN~tIG PASSES. 16:46 DYNAMIG PASSES COMPLETED STEP UP RATE T0100~ bw d LET STABILIZE. 17:40 CJO T~ PRIDE INSPECT LOC PJSM GO dVER PROGEDURES. 18:a0 INJ. RATE ESTABLISHED 1080 BWPD & 1243 si PERFORM STA~TIC ST4PS AS PER PRdGR~. 19:32 RIH ~60 FPM TO FLAG ~ 7,247' SLM(7,267' MD), BEGIN DYNAI~IC LOGGING PASSES AS PER PROGRARA...POOH 150' FPM 22:09 OOH WI LOGGING TOOL STANDBY FOR QATA. 22:45 RECEIVED GO~D DATA NOTIFY REP. 22:50 BEGIN RD. 23:50 RD COMPLETE...NOTIFY PAD OP, IV4RMAL SSV, LEAVE CHOKED ~ 1000 BVNPD ~S PER PAD OP....EMD TICKET F ~ Tb IA OA -> 1300 920 .~oe casTs SERVICE COII~dN1f - SER1f~E DA~Y COST CUMUL TOTAL PDS $4 550 S10 585 SCHLUI~BERGER $870 $24 OBA SCHLUPABERGER PLUS 15 PERCENT $5 802 S$ 305 T4TAL F~LD ESTIMATE: $11 222 $d2 954 . ' ~ ~ Measure Depth I 0 1000 2000 3000 4000 5000 6000 7000 8000 0 500 1000 1500 2000 ~ 2500 ~ 3000 3500 4000 4500 5000 Maz Hole Angle 76 deg C~ 3704' MPG-13 Directional Survey 05/20/08 ~~r~l~m~~r~~~~ Alaska Data & Consulting Services 2525 Gambell Street, Suite 400 Anchorage, AK 99503-2838 ATTN: Beth Wnll _Inh It NO. 4712 z Company: State of Alaska ~~ ~~~~ ~ ~I= Alaska Oil & Gas Cons Comm rw ~V~ Attn: Christine Mahnken 333 West 7th Ave, Suite 100 Anchorage, AK 99501 ~ n,. MPB-04A 12021150 MEM PROD PROFILE 04/17/08 1 1 MPG-13 12021151 MEM INJECTION PROFILE C 04/18/08 1 1 Z-26A 11978454 MEM GLS aU(p-p 04/23/08 1 1 Z-29 11978453 MEM GLS - 04/22/08 1 1 Y-36 12005204 MEM GLS y 02/12/08 1 1 4-14AlS-37 12031471 _ PRODUCTION PROFILE W/FSI 04/12/08 1 1 Y-07A 11966254 SCMT / 05/02/08 1 1 02-01 B 11966257 LDL _ ~ (p 05/10/08 1 1 X-16A 11975771 USIT L .- C 05/14/08 1 1 07-26 12061688 USIT - 05/16/08 1 1 05-34 11966251 USIT - 04/13/08 1 1 OS-23A 118966257 USIT ( 05/13/08 1 1 S-33 11962596 USIT 04/15/08 1 1 V-223 12061688 CH EDIT PDC GR (USIT `~ - (~ 03/23/08 1 V-220 40016600 OH MWD/LWD EDIT ap _ 03/03/08 2 1 4-14A/S-37 40016545 OH MWD/LWD EDIT p~.-U l / 02/18/08 2 1 05-22B 11628800 MCNL 10/22/07 1 1 05-136 12021140 MCNL `~j` 01/31/08 1 1 Z-10 12066520 RST (~L 04/10/08 1 1 D-10 11975766 RST 04/25/08 1 1 ~~^~~ ~~•~••v ~~~ww~ •,~.v ~~r ~ v ~ V~V~Y nYV MIYV nGl Vn1Y IIYV VIYG l.Vr') CN\.n I V: BP Exploration (Alaska) Inc. Petrotechnical Data Center LR2-1 900 E. Benson Blvd. " ,, Anchorage, Alaska 99508 Date Delivered: n,, ;, `<'. :~~li~i~j Alaska Data & Consulting Services 2525 Gambell Street, Suite 400 Anchorage, AK 99503-2838 ATTN: Beth Received by: • • ~\ ~~~~ STATE OF ALASKA ~ ~~ _~ "` !'~~\ ALA OIL AND GAS CONSERVATION COMMISSION 6yR~ REPORT OF SUNDRY WELL OPERATIONS ~~B ~ o zoos 1. Operations Abandon ~ Repair Well ~ Plug Perforations ~ Stimulate ~ 1S 8S Ui1S. QRNCIIS~IP1- Performed: Alter Casing ~ Pull Tubing ~ Perforate New Pool ~ Waiver ~ Time Extensidn [~tIG~1Gfi~~Q Change Approved Program ~ Operat. Shutdown ~ Perforate Q Re-enter Suspended Well 2. Operator BP Exploration (Alaska), Inc. 4. Current Well Class: 5. Permit to Drill Number: Name: Development Exploratory 197-1200 3. Address: P.O. Box 196612 Stratigraphic Service ' 6. API Number: Anchorage, AK 99519-6612 50-029-22782-00-00 7. KB Elevation (ft): 9. Well Name and Number: 58.6 KB MPG-13 8. Property Designation: 10. Field/Pool(s): ADLO-025516 MILNE POINT UNIT Field/ SCHRADER BLUFF Pool 11. Present Well Condition Summary: Total Depth measured 7421 ~ feet Plugs (measured) None true vertical 4495.95- feet Junk (measured) None Effective Depth measured 7292 feet true vertical 4393 feet Casing Length Size MD TVD Burst Collapse Conductor 110' 20" 91.4# H-40 32' - 110' 32' - 110' 1490 470 Production 7404' 7" 26# L-80 31' - 7404' 31' - 4482' 7240 5410 c~iv~~ ~~~ `r ~UUU Perforation depth: Measured depth: 6922 - 6940 ~ 7094 - 7130 7190 - 7224 True Vertical depth: 4104 - 4118 4237.87 - 4266.03 4313.11 - 4339.88 = _ Tubing: (size, grade, and measured depth) 3-1/2" 9.3# L-80 SURFACE - 6725' 0 0 - Packers and SSSV (type and measured depth) 7" BAKER S-3 6658' 0 0 0 0 0 0 12. Stimulation or cement squeeze summary: Intervals treated (measured): ~~~ ~ C' ~ ~ ' ,, _ , r t ~ ~ "~, '~~1' Treatment descriptions including volumes used and final pressure: 13. Representative Daily Average Production or Injection Data Oil-Bbl Gas-Mcf Water-Bbl Casing Pressure Tubing pressure Prior to well operation: 563 1270 Subsequent to operation: 415 1271 14. Attachments: 15. Well Class after proposed work: Copies of Logs and Surveys Run Exploratory f '' Development ~"` ServiCe Daily Report of Well Operations X 16. Well Status after proposed work: OiI ! Gas ~ WAG '' GINJ (~' WINJ ~' WDSPL 17. I hereby certify that the foregoing is true and correct to the best of my knowledge. Sundry Number or N/A if C.O. Exempt: N/A Contact Gary Preble Printed Name Gary Preb Title Data Management Engineer Signature Phone 564-4944 Date 2/19/2008 Form 10-404 ~tevised 04/2006 ~-~~ ~ Submit Original Only • MPG-13 DESCRIPTION OF WORK COMPLETED NRWO OPERATIONS EVENT SUMMARY ACTIVITYDATE ~ SUMMARY ~i 2/11/2008:`***""**WELL INJECTING UPON ARRIVAL***'`**** ,INJECTION RATE OF 540 BWPD. SHUT IN WELL AT WING TO RIH. 'INITIAL T/I/O = 1300/0/0 PSI. 'API DATA FOR 2.5" HSD POWERJET GUNS, 60 DEG PHASING, 6 SPF: ;PENETRATION 25.2", ENTRANCE HOLE 0.32". FINAL T/I/O = 1100/0/0 WELL LEFT SHUT-IN, DSO NOTIFIED JOB COMPLETED FLUIDS PUMPED BBLS 1 DIESEL WELL LOG TRANSMITTAL ProActive Diagnostic Services, Inc. To: State of Alaska AOGCC 333 W. 7th Street Suite 700 3001 Porcupine St. Anchorage, Alaska 99501 RE: Distribution - Final Print(s) The technical data listed below is being submitted herewith, Please acknowledge receipt by returning a signed copy of this transmittal letter to the attention of: Joey Burton / Jeni Thompson ProActive Diagnostic Services, Inc. P. 0. Box 13S9 Stafford, TX 77497 BP Exploration(Alaska}, Inc. Petro-Technical Data Center LR:~-I 900 East Benson Blvd. Anchorage, Alaska 99508 LOG DIGITAL MYLAR / BLUE LINE REPORT WELL DATE TYPE OR SEPIA PRINT(S} OR CD-ROM FILM BLUELINE Open Hole 1 I 1 MP G-13i 10-03-03 Res. Eval. CH 1 1 1 Mech. CH 1 Caliper Survey Print Name: ProActive Diagnostic Services, Inc., Po Box ! 369 Stafford Tx 77477 Phone:(281) 565-9085 Fax:(281) 565-1369 E-mail: pds~memorylog.com Website: www.memorylog.com MEMORA :iUM State o Alaska Alaska Oil and Gas Conservation Commission TO: Camille O. Taylor Chair THRU: Tom Maunder*"'~(,~_~ P.I. Supervisor FROM: Jeff Jones Petroleum Inspector DATE: September 2, 2002 SUBJECT: Mechanical Integrity Tests BPXA G,'K, L Pads G-09i, G-13i, K-21 i, L-15i MPU Milne Point Field NON- CONFIDENTIAL · Packer Depth Pretest Initial 15 Min, 30 Min. J WellI G-09i I Typelnj. I S I T.V.D. J 3985 J Tubingl 1300 P.T.D.I 1971170ITypetestl P ITestpsil 1500 I CasingI 850 1152011505115051 P/FIPI Notes:Pre-testpress, monitored&stable. WellI G-13i I Typelnj. I S I T.V.D. I 3902 I TUbing 1450 I 1450 I 1450 I lntervall 4 97 200ITypetestl P 'lTestpsi Notes: Pre-test press, monitored & stable. WellI K-21i JTypelnj.I Si .v.D. P.T.9.I 1961760 ITypetestl P ITestpsil 1736 I CasingI 825 1180O1178011780I P/F I PI Notes: Pre-test press, monitored & stable. "'"" · - WellI L-15i Type lnj. J N I T.V:D. I 6947 I'TubingJ 4450 J 4450 I 4450 J 4450 J lntervalI 4 P.T.D.I 1940620 TypetestI P ITestpsil 1737 I CasingI zero I lS00 I 1760 I 1760 I P/F I-" Notes: Pre-test press, monitored & stable. ---'- Type INJ. Fluid Codes F = FRESH WATER INJ. G = GAS INJ. S = ~ -~ !.'~ '/"/ATER INJ. N -': :, ' .~ECTING Type Test M= Annulus Monitoring P= Standard Pressure Test R= Internal Radioactive Tracer Survey A= Temperature Anomaly Survey D= Differential Temperature Test Interval I= Initial Test 4= Four Year Cycle V= Required by Variance W= Test during Workover O= Other (describe in notes) Test's Details September 2, 2002: I traveled to BPXA's Milne Point Field t° witness 4 year MIT's on water injection wells G-09i, G- 13i, K-21i and L-15i. Jeff Jones was the BPXA representative in charge of the tests. The pre-test pressures were monitored for 15 minutes and the standard annulus pressure test was then performed on each well, with all fOur wells passing the MIT. I inSpected each well house during the tests and no exceptions were noted. Summary: I witnessed successful MIT's on BPXA's Milne Point Field injection wells G-09i, G-13i, K-21i and 1-15i. Four well houses inspected, no exceptions noted. M.I.T.'s performed: _4 Attachments: Number of Failures: 0 Total Time during tests: 4.5 hrs. cc: ,SCANNED OCT 2002 MIT repcA form 5/12/00 L.G. MIT MPU G-09i,G-13i,K-21 i,L-15i 9-2-02 JJ.xls 9/10/2002 Well Compliance Report File on Left side of folder 197-120-0 MILNE POINT UNIT SB G-13 50- 029-22782-00 BP EXPLORATION MD~J~'~421 zI'VD 04496 Completion Date: j6/8/98 Completed Status: 1WINJ Current: Name Interval Sent Received T/C/D D 8116 ~ SPERRY MPT/GR/EWR4 OH 9/17/97 9/17/97 D 8735 ~~ SPERRY MPT/GR/EWR4 OH 11/18/98 11/18/98 L DGR/EWR4-MD - &'~AL 4532-7421 OH 9/17/97 9/17/97 L DGR/EWR4-TVD ~e~AL 2953-4496 OH 9/17/97 9/17/97 L GR/CCL-PERF FCJ:NAL 7250-7290 CH 5 6/12/98 6/15/98 L 1NJP-SPIN/TEM/ ,~AL PRES 7040-7280 CH 5 8/18/98 8/20/98 L SBT F~ 4963-7286 CH 5 6/12/98 6/15/98 R MWD SRVY ~PEI~(Y 0-7421. OH 8/3/98 8/5/98 T 8612 ~ SCHLUM PCD CH 8/12/98 8/20/98 Daily Well Ops ?/~ ~/]~ -- F~//6°/?) Are Dry Ditch Samples Required? yes ~ _ And Receive~- Was the well cored? yes ,_.~._. Analysis Description Re~ yes no Sample ~ .... Comments: Tuesday, May 30, 2000 Page I of l 0 !:! I I--I_1 ~ G S ~: F:I~JI C Ec: To: WELL LOG TRANSMITTAL State of Alaska Alaska Oil and Gas Conservation Comm. Atm.: Loft Taylor 3001 Porcupine Dr. Anchorage, Alaska 99501 MWD Formation Evaluation Logs - MPG- 13, AK-MM-70204 November 25, 1998 MPG-13: 2" x 5"MD Resistivity and Gamma Ray Logs: 50-029-22782-00 2"x 5" TVD Resistivity and Gamma Ray Logs: 50-029-22782-00 1 Blueline 1 Folded Sepia 1 Blueline 1 Folded Sepia PLEASE ACKNOWLEDGE RECEIPT BY SIGNING AND RETURNING THE ATTACHED COPIES OF THE TRANSMITFAL LETTER TO THE ATFENTION OF: Sperry-Sun Drilling Services Attn: Ali Turker 5631 Silverado Way, Suite G. Anchorage, Alaska 99518 .t BP Exploration (Alaska) Inc. Petro-technical Data Center, MB3-3 900 E. Benson Blvd. Anchorage, Alaska 99519-6612 THIS REPLACES ALL PREVIOUS DATA DATE: 5631 Silverado Way, Suite G · Anchorage, Alaska 99518 · (907) 273-3500 · Fax (907) 273-3535 A Halliburton Company r'l I~ I ti__ I IM I~ SI::R~I I-- E S To: WELL LOG TRANSMITTAL State of Alaska Alaska Oil and Gas Conservation Comm. Atm.: Loft Taylor 3001 Porcupine Dr. Anchorage, Alaska 99501 MWD Formation Evaluation Logs November 18, 1998 ' MPG-13, AK-MM-70204 1 LDWG formatted Disc with verification listing. API#: 50-029-22782-00 PLEASE ACKNOWLEDGE RECEIPT BY SIGNING AND RETURNING TIlE ATrACltED COPIES OF ~ TRANSMITTAL LETTER TO ~ ATrENTION OF: Sperry-Sun Drilling Services Atto: Ali Turker 5631 Silverado Way, Suite G. Anchorage, Alaska 99518 BP Exploration (Alaska) Inc. Petro-technical Data Center, MB3-3 900 E. Benson Blvd. Anchorage, Alaska 99519-6612 R, EPROCESSED THIS ~EPLACES ALL P!tEVtOU5 DATA DATE: 5631 Silverado Way, Suite G · Anchorage, Alaska 99518 · (907) 273-3500 · Fax (907) 273-3535 A Halliburton Company GeoQuest 500 W. International Airport Road Anchorage, AK 99518-1199 ATTN: Sherrle NO. 11438 Company: Field: Alaska Oil & Gas Cons Comm Attn: 'Lorl Taylor 3001 Porcupine Drive Anchorage, AK 99501 MIIne Point (Cased Hole) 8/18/98 Well Job # Log Description. Date BL RF Sepia LIS Tape , , MPU F-62 L~.~ (--- " INJECTIONPRORLE '980706 I 1 i , MPG-13 INJECTION PROFILE 980718 I 1 , ,, MPH-09 STATIC TEMPERATURE SURVEy 980 719 ! 1 MPH-09 . STATIC TEMPERATURE SURVEY 9 80 719 1 1 MPH-09 STATIC TEMPERATURE SURVEY 9 80 719 I 1 MPH-09 CEMENT MAP LOG 980720 1 . 1 MPJ-22 4 ARM CALIPER 980719 1 1 , , PLEASE ACKNOWLEDGE RECEIPT BY SIGNING AND RETURNING ONE COPY EACH TO: BP Exploration (Alaska) Inc. Petrotectnical Data Center MB3-3 900 E. Benson Blvd. Anchorage, Alaska 99519-6612 Date Delivered: RECEIVED AUG 20 1998 Alaska Oii & Gas Cons. Commission ,~n~hnr~n~. Schlumberger GeoQuest 500 W. International Airport Road Anchorage, Alaska 99618-1199 / GeoQuest 500 W. International Airport Road Anchorage, AK 99518-1199 ATTN: Sherrle NO. 11424 Company: Field: Alaska Oil & Gas Cons Comm Attn: Lori Taylor 3001 Porcupine Drive Anchorage, AK 99501 Milne Point (Cased Hole) Well Job # Log Description Date BL RF Sepia LIS Tape C~P'I~O MPG-13 ~J~ i~(eJ~2,: 98396 SBT(PDC) ' 980603 ,. ~ " ! MPJ-20 .,,,r ::?/',.,},"z.~ 98401 GR/CCL (PDC) 980703 I 8/12/98 PLEASE ACKNOWLEDGE RECEIPT BY SIGNING AND RETURNING ONE COPY EACH TO: BP Exploration (Alaska) Inc. Petrotectnical Data Center MB3-3 900 E. Benson Blvd. Anchorage, Alaska 99519-6612 Date Delivered: RECEIVED AUG 2 0 1998 Alaska Oil & Gas Cons. Commission Am~,nmn~ Schlumberger GeoQuest 500 W. International Airport Road Anchorage, Alaska 99618-1199 STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMMISSION WELL COMPLETION OR RECOMPLETION REPORT AND LOG 1. Status of Well Classification of Service Well [] Oil [] Gas []Suspended []Abandoned [] Service Water Injection 2. Name of Operator 7. Permit Number BP Exploration (Alaska)Inc. 97-120 3. Address 8. APl Number P.O. Box 196612, Anchorage, Alaska 99519-6612 50-029-22782 4. Location of well at surface ~- ....... 9. Unit or Lease Name 1956' NSL, 3439' WEL, SEC. 27, T13N, R10E, UM ~ ........ ~,~ ~i~'~¢; ~ ~~ Milne Point Unit At top of productive interval ~ ..~ ~r~'"-"T~./ iI 10. Well Number 1470' NSL, 2756' WEL, SEC._ 22, T13N, R10E, UM ~/ ~_~ ~ .,~~~ . MPG-13 At total depth 11 Field and Pool 1666' NSL, 2718' WEL, SEC. 22, T13N, R10E, UM ~'- ..... :. ?-v Milne Point Unit / Schrader Bluff 5. Elevation in feet (indicate KB, DF, etc.) ~6. Lease Designation and Serial No. KBE = 58.60'~ ADL 025516 12. Date~¢~~Spudded , ,~13. Date T.D. Reached ~ 14. Date Comp., Susp., or Aband.]~ 15. Water depth, if offshore ~16. No. of Completions ~ ~/~ 6/8/98 N/A MSLI One 17. Total Depth (MD+~D) ~18. Plug Back Depth (MD+~D)119. Directional Su~ey [20. Depth where SSSV set ~21. Thickness of Permafrost 7421 4496 FT~ 7292 4393 FT~ ~Yes ~No~ N/A MD ~ 1800' (Approx.) 22. Type Electric or Other Logs Run MWD, LWD, GR/CCL 0RIGIRI.A', 23. CASING¢ LINER AND CEMENTING RECORD CASING SE~ING OEPTH HOLE SIZE WT. PER FT. G~DE TOP BOSOM SIZE CEMENTING RECORD AMOUNT PULLED 20" 91.4¢ H-40 32' 110' 24" 250 SX Arcticset I (Approx.) 7" 26~ L-80 31' 7404' 8-1/2" 1209 sx PF 'E', 130 sx Class 'G' ~'~ 24. Perforations open to Production (MD+~D of Top and 25. TUBING RECORD Alaska 0il & Gas Cons. Bottom and inte~al, size and numbe0 S~ZE DEPTH SET (MD) PACKER ~~ge 4-1/2" Gun Diameter, 5 spf 3-1/2", 9.3¢, L-80 6725' 6658' MD ~D MD ~D 7094'-7130' 4238'-4266' 7190'-7224' 4313'-4340' 26. AC~D, FRACTURE, CEMENT SQUEEZE, ETC. DEPTH INTERVAL (MD) AMOUNT & KIND OF MATERIAL USED Freeze protect with 100 bbls diesel 7292' Cement retainer set 7302'-7305' 20 bbls remedial 'G' cement, sqzd to 3500 ps~ 27. PRODUCTION TEST Date First Production IMethod of Operation (Flowing, gas li~, etc.) June 20, 1998 ! Water Injection Date of Test Hours Tested PRODUCTION FOR OIL-BBL GAS-MCF WATER-BBL CHOKE S~ZE IGAS-O~L RATIO TEST PERIOD I Flow Tubing Casing Pressure ;CALCU~TED OIL-BBL GAS-MCF WATER-BBL OIL GRAVIs-APl (CORR) Press. 24-HOUR RATE 28. CORE DATA Brief description of lithology, porosity, fractures, apparent dips and presence of oil, gas or water. Submit Core chips. Form 10-407 Rev. 07-01-80 Submit In Duplicate 29. Geologic Markers 30. Formation Tests Measured True Vertical Include interval tested, pressure data, all fluids Marker Name Depth Depth recovered and gravity, GOR, and time of each phase. TSBD 7096' 4239' TSBC 7146' 4278' TSBB 7186' 4310' 31. List of Attachments Summary of Daily Drilling Reports, Surveys i32. I hereby certify th~oregoing~.~-~ ..-,- is.s.s.s.s.s.s.s.s.s~~d correct to the best of my knowledge / Signed '~'~"~ '//' "T~, e.~~J~~ Title Drilling] Engineerin~ Supervisor Date ¢~'/.,t MPG-13 97-120 Prepared By Name/Number: Kathy Campoamor, 564-5122 Well Number Permit No. /Approval No. INSTRUCTIONS GENERAL: This form is designed for submitting a complete and correct well completion report and log on all types of lands and leases in Alaska. ITEM 1: Classification of Service Wells: Gas injection, water injection, steam injection, air injection, salt water disposal, water supply for injection, observation, injection for in-situ combustion. ITEM 5: Indicate which elevation is used as reference (where not otherwise shown) for depth measurements given in other spaces on this form and in any attachments. ITEM 16 AND 24: If this well is completed for separate production from more than one interval (multiple completion), so state in item 16, and in item 24 show the producing intervals for only the interval reported in item 27. Submit a separate form for each additional interval to be separately produced, showing the data pertinent to such interval. ITEM 21: Indicate whether from ground level (GL) or other elevation (DF, KB, etc.). ITEM 23: Attached supplemental records for this well should show the details of any multiple stage cementing and the location of the cementing tool. ITEM 27: Method of Operation: Flowing, Gas Lift, Rod Pump, Hydraulic Pump, Submersible, Water Injection, Gas Injection, Shut-In, Other-explain. ITEM 28: If no cores taken, indicate 'none'. Form 10-407 Rev. 07-01-80 Facility M Pt G Pad Progress Report Well MPG- 13 Rig Page Date 1 03 August 98 Date/Time 13 Jul 97 14 Jul 97 15 Jul 97 16 Jul 97 17 Jul 97 18 Jul 97 01:01-02:00 02:00-05:00 05:00-06:00 06:00-13:30 13:30-17:00 17:00-21:00 21:00-00:00 00:00-02:00 02:00-03:30 03:30-04:00 04:00-06:00 06:00-06:45 06:45-07:00 07:00-03:00 03:00-04:00 04:00-05:00 05:00-05:30 05:30-06:00 06:00-12:30 12:30-13:30 13:30-13:45 13:45-14:15 14:15-14:30 14:30-15:00 15:00-00:00 00:00-01:00 01:00-03:00 03:00-04:00 04:00-06:00 06:00-06:30 06:30-07:30 07:30-08:30 08:30-10:00 10:00-18:00 18:00-18:30 18:30-20:00 20:00-21:00 21:00-21:30 21:30-23:00 23:00-06:00 06:00-10:00 10:00-11:30 11:30-12:30 12:30-20:30 20:30-21:30 21:30-00:00 00:00-01:00 01:00-03:30 03:30-06:00 06:00-06:30 06:30-10:00 10:00-11:30 11:30-13:00 13:00-20:30 Duration 3/4 hr 3hr lhr 7-1/2 hr 3-1/2 hr 4hr 3hr 2hr 1-1/2 hr 1/2 hr 2hr 3/4 hr 1/4 hr 20 hr lhr lhr 1/2 hr 1/2 hr 6-1/2 hr lhr 1/4 hr 1/2 hr 1/4 hr 1/2 hr 9hr lhr 2hr lhr 2hr 1/2 hr lhr lhr 1-1/2 hr 8hr 1/2 hr 1-1/2 hr lhr 1/2 hr 1-1/2 hr 7hr 4hr 1-1/2 hr lhr 8hr lhr 2-1/2 hr lhr 2-1/2 hr 2-1/2 hr 1/2hr 3-1/2 hr 1-1/2 hr 1-1/2 hr 7-1/2 hr Activity Rig moved 30.00 % Rig moved 30.00 % Rig moved 30.00 % Rig moved 100.00 % Rigged up Divertor Removed Divertor Installed Divertor Made up BHA no. 1 Installed Divertor Functioned Divertor Made up BHA no. 1 Circulated at 110.0 ft Held safety meeting Drilled to 2296.0 ft Circulated at 2296.0 ft Pulled out of hole to 728.0 ft Serviced Top drive R.I.H. to 2296.0 ft Drilled to 3219.0 ft Circulated at 3219.0 ft Pulled out of hole to 2941.0 ft Backreamed to 2480.0 ft Pulled out of hole to 1837.0 ft R.I.H. to 3219.0 ft Drilled to 4535.0 ft Circulated at 4535.0 ft Pulled out of hole to 730.0 ft Pulled BHA Made up BI-LA no. 2 R.I.H. to 1700.0 ft Serviced Block line Serviced Top drive R.I.H. to 4535.0 ft Drilled to 5593.0 ft Circulated at 5593.0 ft Pulled out of hole to 4440.0 ft Circulated at 4446.0 ft R.I.H. to 4700.0 ft Washed to 5593.0 ft Drilled to 6355.0 ft Drilled to 6833.0 ft Circulated at 6833.0 ft Pulled out of hole to 5401.0 ft Drilled to 7421.0 ft Circulated at 7421.0 ft Pulled out of hole to 1700.0 ft Serviced Top drive R.I.H. to 7421.0 ft Circulated at 7421.0 ft Circulated at 7421.0 ft Pulled out of hole to 700.0 ft Pulled BHA Removed Drillstring handling equipment Ran Casing to 7402.0 ft (7in OD) Facility M Pt G Pad Progress Report Well MPG- 13 Rig (~M+)/~/&~or$ ~-~ Page Date 2 03 August 98 Date/Time 19 Jul 97 20:30-23:00 23:00-01:00 01:00-02:00 02:00-04:30 04:30-06:00 06:00-07:00 07:00-08:00 08:00-09:30 09:30-11:00 11:00-14:30 14:30-15:00 15:00-03:00 Duration 2-1/2 hr 2hr lhr 2-1/2 hr 1-1/2 hr lhr lhr 1-1/2 hr 1-1/2 hr 3-1/2 hr 1/2 hr 12hr Activity Circulated at 7402.0 ft Mixed and pumped slurry - 186.000 bbl Functioned Other sub-surface equipment Circulated at 2105.0 ft Mixed and pumped slurry - 450.000 bbl Displaced slurry - 80.000 bbl Circulated at 0.0 ft Rigged down Casing handling equipment Rigged down Divertor Installed Casing on landing string Installed Accessories Rig moved 100.00 % Progress Report Facility M Pt G Pad Well MPG-13 Page 1 Rig ~/Vt-~ Date 03 August 98 Date/Time 01 Jun 98 02 Jun 98 06:00-15:00 06:00-10:00 10:00 10:00-12:00 12:00 12:00-15:00 15:00 15:00-16:30 15:00-16:00 16:00 16:00-16:30 16:30 16:30-20:30 16:30-17:30 17:30 17:30-18:00 18:00 18:00-20:30 20:30 20:30-22:30 20:30-22:30 22:30 22:30-23:30 22:30-23:30 23:30 23:30-06:00 23:30-01:00 01:00 01:00-02:00 02:00 02:00-05:00 05:00 05:00-06:00 06:00 06:00-19:30 06:00-08:00 08:00 08:00-18:00 18:00 18:00-19:30 19:30 19:30-02:00 Duration 9hr 4hr 2hr 3hr 1-1/2 hr lhr 1/2 hr 4hr lhr 1/2 hr 2-1/2 hr 2hr 2hr lhr lhr 6-1/2 hr 1-1/2 hr lhr 3hr lhr 13-1/2 hr 2hr 10hr 1-1/2 hr 6-1/2 hr Activity Move rig Rig moved 100.00 % At well location - Slot Rigged up Draw works Equipment work completed Accept Rig at 12:00 hrs LMH. Rigged up Draw works Stopped: To hold safety meeting PJSM Wellhead work Installed Hanger plug Stopped: To hold safety meeting PJSM. Removed Xmas tree Equipment work completed Nipple up All rams Rigged up All rams Stopped: To service drilling equipment Repair air line. 1 hr downtime. Rigged up All rams Stopped: To hold safety meeting Crew change. ISO 14001 training with both crews. Rigged up All rams Equipment work completed Test well control equipment Tested All rams Pressure test completed successfully - 5000.000 psi Tested BOPs to 250/5000 psi. Tested Hydrill 250/3000 psi. Wellhead work Retrieved Hanger plug Equipment work completed Run Drillpipe, 3-1/2in O.D. Singled in drill pipe to 0.0 ft Stopped: To hold safety meeting PJSM. Singled in drill pipe to 190.0 ft 6 joints picked up Drill collars. Singled in drill pipe to 2100.0 ft Stopped: To circulate Circulated at 2100.0 ft Stopped: To hold safety meeting Crew change. Run Drillpipe, 3-1/2in O.D. (cont...) Singled in drill pipe to 2100.0 ft At Top of cement: 2105.0 ft Tag ES Cementer Singled in drill pipe to 6700.0 ft Stopped: To hold safety meeting Crew change. Singled in drill pipe to 7315.0 ft On bottom Pull Drillpipe, 3-1/2in O.D. Facility M Pt G Pad Progress Report Well MPG-13 Page 2 Rig ,~m~t~,A/- .-~,5 Date 03 August 98 Date/Time 03 Jun 98 04 Jun 98 19:30-20:30 20:30 20:30-21:30 21:30 21:30-02:00 02:00 02:00-06:00 02:00-04:00 04:00 04:00-04:30 04:30 04:30-06:00 06:00 06:00-10:00 06:00-07:00 07:00 07:00-07:30 07:30 07:30-09:30 09:30 09:30-10:00 10:00 10:00-15:00 10:00-15:00 15:00 15:00-06:00 15:00-18:00 18:00 18:00-21:00 21:00 21:00-00:00 00:00 00:00-06:00 06:00 06:00-08:30 06:00-08:30 08:30 08:30-14:30 08:30-13:30 13:30 13:30-14:30 14:30 14:30-21:30 14:30-18:00 18:00 Duration lhr lhr 4-1/2 hr 4hr 2hr 1/2 hr 1-1/2 hr 4hr lhr 1/2 hr 2hr 1/2 hr 5hr 5hr 15hr 3hr 3hr 3hr 6hr 2-1/2 hr 2-1/2 hr 6hr 5hr lhr 7hr 3-1/2 hr Activity Laid down 34.0 ft of 3-1/2in OD drill pipe Stopped: To pressure test Casing test failed. Reverse circulated at 7281.0 ft Stopped · To hold safety meeting PJSM. Pulled Drillpipe in stands to 0.0 ft At Surface: 0.0 ft Run Drillpipe, 3-1/2in O.D. Ran Drillpipe in stands to 2149.0 ft Stopped: To test equipment Tested Casing - Via string Suspended pressure test on Casing, observed leak Ran Drillpipe to 2149.0 ft (3-l/2in OD) Stopped · To hold safety meeting Crew change. Run Drillpipe, 3-1/2in O.D. (cont...) Ran Dfillpipe to 5072.0 ft (3-1/2in OD) Stopped: To pressure test Tested Casing - Via annulus Pressure test completed successfully - 3000.000 psi Ran Drillpipe in stands to 7301.0 ft Stopped: To pressure test Tested Casing - Via annulus and string Pressure test completed successfully - 3200.000 psi Casing tests good. Casing shoe has broken down (able to pump out the end). Pull Drillpipe, 3-1/2in O.D. Pulled Drillpipe in stands to 0.0 ft Stopped: To hold safety meeting Electric wireline work Conducted electric cable operations On bottom Start logging. Rig crew change. Conducted electric cable operations Completed logging run with GR/CCL from 7300.0 ft to 5000.0 ft Conducted electric cable operations Completed run with Gun assembly from 7305.0 ft to 7302.0 ft Conducted electric cable operations Completed misrun with Other sub-surface equipment to 7292.0 ft Crew change (Rig). Electric wireline work (cont...) Conducted electric cable operations Completed run with Cement retainer from 0.0 ft to 7292.0 ft Run Drillpipe, 3-1/2in O.D. Ran Drillpipe in stands to 7292.0 ft Stopped: To circulate Reverse circulated at 7292.0 ft Stopped: To hold safety meeting PJSM. Cement: Squeeze Rigged up Cement unit Stopped: To hold safety meeting Crew change. Facility M Pt G Pad Progress Report Well MPG-13 Page 3 Rig 4mfl~/~/-~5~ Date 03 August 98 Date/Time 05 Jun 98 06 Jun 98 18:00-19:00 19:00 19:00-21:00 21:00 21:00-21:30 21:30 21:30-04:00 21:30-04:00 04:00 04:00-06:00 04:00-06:00 06:00 06:00-08:30 06:00-08:30 08:30 08:30-03:00 08:30-15:00 15:00 15:00-18:00 18:00 18:00-03:00 03:00 03:00-06:00 03:00-06:00 06:00 06:00-09:00 06:00-09:00 09:00 09:00-15:30 09:00-12:00 12:00 12:00-15:30 15:30 15:30-23:00 15:30-18:00 18:00 18:00-23:00 23:00 23:00-06:00 23:00-02:00 Duration lhr 2hr 6-1/2 hr 6-1/2 hr 2hr 2hr 2-1/2 hr 2-1/2 hr 18-1/2 hr 6-1/2 hr 3hr 9hr 3hr 3hr 3hr 3hr 6-1/2 hr 3hr 3-1/2 hr 7-1/2 hr 2-1/2 hr 5hr 7hr 3hr Activity Rigged up Cement unit Equipment work completed Batch mixed slurry - 20.000 bbl Completed operations Final rate and pressure: 1 bpm/1480 psi. Shoe and squeeze perfs cemented. Tested Casing Pressure test completed successfully - 3500.000 psi Fluid system Fill pits with Brine Completed operations Pull Drillpipe, 3-1/2in O.D. Pulled Drillpipe in stands to 4650.0 ft Stopped: To hold safety meeting Crew change. Pull Drillpipe, 3-1/2in O.D. (cont...) Pulled Drillpipe in stands to 0.0 ft At Surface: 0.0 ft Service Rig. Electric wireline work Conducted electric cable operations Began precautionary measures Conducted electric cable operations Began precautionary measures Crew change. Conducted electric cable operations Completed run with Gun assembly from 0.0 ft to 7290.0 PBTD 7290-ft elmd. Gun size 4 1/2" Alpha Jet-32.0 grn charges. 5 svf. 60 deg phased. Ramd,on orientation. ~°~i-? '07 /.'~-, ~, '717,:? - ',:.'~." :- Run Drillpipe, 3-1/2in O.D. '.." Ran Drillpipe in stands to 3500.0 ft Stopped: To hold safety meeting Crew change. Run Drillpipe, 3-1/2in O.D. (cont...) Ran Drillpipe in stands to 7290.0 ft Stopped: To circulate Fluid system Reverse circulated at 7290.0 ft Stopped: To flowcheck well Monitior well. Slight flow. Shut in well. DP pressure 10 lbs. Circulated at 7290.0 ft Stopped: To flowcheck well Monitor well for 15 min. Well dead. Pull Drillpipe, 3-1/2in O.D. Laid down 1875.0 ft of 3-1/2in OD drill pipe Stopped: To hold safety meeting Crew change. Laid down 5415.0 ft of 3-1/2in OD drill pipe Stopped: To hold safety meeting Prepare to pick-up completion. PJSM. Run Single completion, 3-1/2in O.D. Ran Tubing to 0.0 ft (3-1/2in OD) Facility M Pt G Pad Progress Report Well MPG-13 Page 4 .~m~F)~/V/--.~ Date 03 August 98 Rig Date/Time 07 Jun 98 08 Jun 98 02:00 02:00-02:30 02:30 02:30-06:00 06:00 06:00-11:30 06:00-11:30 11:30 11:30-13:00 11:30-12:30 12:30 12:30-13:00 13:00 13:00-15:00 13:00-15:00 15:00 15:00-18:00 15:00-16:30 16:30 16:30-17:00 17:00 17:00-18:00 18:00 18:00-22:00 18:00-19:00 19:00 19:00-22:00 22:00 22:00-00:00 22:00-00:00 00:00 00:00-01:00 00:00-01:00 Duration 1/2 hr 3-1/2 hr 5-1/2 hr 5-1/2 hr 1-1/2 hr lhr 1/2 hr 2hr 2hr 3hr 1-1/2 hr 1/2 hr lhr 4hr lhr 3hr 2hr 2hr lhr lhr Activity Stopped · To pick up/lay out tubulars Ran Tubing to 0.0 ft (3-1/2in OD) Stopped · To pick up/lay out tubulars Ran Tubing to 2800.0 ft (3-1/2in OD) Stopped · To hold safety meeting Crew change. Run Single completion, 3-1/2in O.D. (cont...) Ran Tubing to 6725.0 ft (3-1/2in OD) Crew change and safety meeting.Finish running in hole with completion. Completed run with Hydraulic packer to 6657.0 ft Wellhead work Installed Tubing hanger Make up tubing hanger. Pick up landing jt. LAnd tubing hanger. Lay down tubing hanger. RILDS. Equipment work completed Installed Hanger plug Install and test TWC. Equipment work completed Nipple down All rams Removed BOP stack Nipple down BOPs. Equipment work completed Wellhead work Installed Xmas tree Nipple up tree. Equipment work completed Tested Xmas tree Test tubing hanger and tree. Good test. Pressure test completed successfully - 5000.000 psi Removed Hanger plug Rig up lubricator and pull TWC. Equipment work completed Crew change. Fluid system Circulated at 6725.0 ft Crew change and safety meeting. Rig up HB&R. PT lines to 4500 psi. Good. Stopped · To circulate Freeze protect well - 100.000 bbl of Diesel HB&R pumped diesel followed by inhibited brine followed by diesel. Stopped · To pressure test Run Single completion, 3-1/2in O.D. Installed Permanent packer Shut down pumping. Drop ball. Wait on ball to go on seat. Pressure up on tubing to 3500 psi and set packer/test tubing. Pressure up on casing to test casing. Good test. Rig down HB&R. Equipment work completed Packer set and tested. Casing tested. State waived right to witness test. Wellhead work Installed Hanger plug Facility M Pt G Pad Progress Report Well MPG-13 Page 5 Rig ~/V/~- 5~ Date 03 August 98 Date/Time 01:00 01:00-06:00 01:00-06:00 06:00 Duration 5hr 5hr Activity lubricator. Blow down lines. Secure cellar. Finish cleaning Equipment work completed Released Rig at 01:00 hrs LMH Move rig Rig moved 75.00 % Rig down and move to K Pad. Rig off station 1 30 OPERATOR: F715.. E COPy /~, 1./,,/.~ / STATEf'~ALASKA ALASKA OIL AND GAS C~SERVATION coMMISSION Mechanical Integrity Test ,. DATE: COMMENTS: COMMENTS: c~-~3', COMMENTS: COMMENTS: , I I 'TUBING INJECTION FLUID: P = PRODUCED WATER INJ. S = SALT WATER INJ M = MISCIBLE INJ. I = INJECTION N = NOT INJECTING ANNULAR: FLUID: GRADIENT: WELL TEST: DIESEL G. ~"t' ~" Initial GLYCOL 4 - Year SALT WATER Workover DRILLING MUD ~ Other OTHER O- ~' '7,_~ t~ ~., 'OJ ~- Cc~, I ~ .) Distribution: odg - Well File c - Operator c - Database c - Trip Rpt File c - Inspector AOGCC REP SIGNATURE OPERATOR REP SIGNATURE MITr"'M-XLT FI-0.5 1 tOev. 3~93) SPE, ;-SUN DRILLING SERVICES ANCHORAGE ALASKA BP EXPLORATION MILNE POINT / MPG-13 500292278300 NORTH SLOPE BOROUGH COMPUTATION DATE: 7/28/97 DATE OF SURVEY: 071797 MWD SURVEY JOB NUMBER: AK-MM-70204 KELLY BUSHING ELEV. = 58.60 FT. OPERATOR: BP EXPLORATION TRUE SUB-SEA MEASD VERTICAL VERTICAL DEPTH DEPTH DEPTH COURS INCLN DG MN COURSE DLS TOTAL DIRECTION RECTANGULAR COORDINATES DEGREES DG/100 NORTH/SOUTH EAST/WEST VERT. SECT. .00 .00 -58.60 112.00 112.00 53.40 202.00 202.00 143.40 290.44 290.43 231.83 384.11 384.10 325.50 0 0 0 0 0 40 0 14 0 20 N .00 E .00 .00N .00E N .00 E .00 .00N .00E S 29.29 W .74 .46S .26W S 89.43 W .67 .91S .70W N .56.E .45 .64S .89W .00 .00 - .49 -1.00 -.76 473.92 473.91 415.31 565.95 565.90 507.30 658.08 657.92 599.32 751.40 751.00 692.40 844.06 843.19 784.59 0 55 2 7 3 17 4 46 6 37 N 33.17 E .75 .24N .49W N 31.42 E 1.29 2.32N .81E N 28.67 E 1.29 6.10N 2.97E N 19.26 E 1.73 12.13N 5.54E N 9.46 E 2.24 21.04N 7.69E .17 2.41 6.46 12.79 21.92 935.56 933.83 875.23 1028.28 1025.08 966.48 1119.58 1114.13 1055.53 1211.31 1202.83 1144.23 1301.03 1288.81 1230.21 8 53 11 30 13 51 15 39 17 29 N 11.70 E 2.51 33.17N 9.99E N 6.48 E 2.98 49.39N 12.49E N 5.61 E 2.58 69.32N 14.59E N 7.35 E 2.02 92.54N 17.25E N 7.47 E 2.04 117.92N 20.55E 34.26 50.67 70.70 94.05 119.64 1393.67 1376.05 1317.45 1486.64 1461.19 1402.59 1579.04 1544.41 1485.81 1672.51 1627.92 1569.32 1765.36 1709.31 1650.71 21 45 25 34 25 57 27 23 30 7 N 8.29 E 4.61 148.72N 24.84E N 8.31 E 4.11 185.63N 30.22E N 7.41 E .59 225.41N 35.71E N 7.30 E 1.54 267.01N 41.08E N 8.15 E 2.98 311.27N 47.10E 150.74 188.04 228.20 270.14 314.81 1857.83 1787.86 1729.26 1949.01 1862.48 1803.88 2040.98 1936.14 1877.54 2132.24 2007.97 1949.37 2223.58 2077.24 2018.64 33 36 36 39 42 32 34 59 9 12 N 10.25 E 3.89 359.41N 54.94E N 11.26 E 3.38 410.86N 64.73E N 10.36 E .74 464.96N 75.06E N 10.47 E 2.37 520.29N 85.'23E N 9.44 E 3.42 578.92N 95.50E 363.57 415.89 470.91 527.13 586.63 2316.49 2143.62 2085.02 2408.40 2205.41 2146.81 2501.30 2263.87 2205.27 2591.88 2315.87 2257.27 2684.58 2364.60 2306.00 46 34 48 54 53 4 56 51 59 42 N 7.30 E 4.98 643.21N 104.91E N 6.74 E 2.57 710.71N 113.22E N 6.46 E 4.48 782.40N 121.51E N 8.14 E 4.45 855.95N 130.96E N 6.13 E 3.58 934.18N 140.73E 651.60 719.60 791.74 865.88 944.70 2777.32 2408.70 2350.10 2869.09 2447.86 2389.26 2962.44 2483.79 2425.19 3055.40 2516.90 2458.30 3146.04 2548.16 2489.56 63 30 65 57 68 46 69 29 70 10 N 7.19 E 4.23 1015.19N 150.20E N 8.34 E 2.90 1097.42N 161.42E N 8.89 E 3.06 1182.59N 174.33E N 9.09 E .80 1268.39N 187.90E N 10.31 E 1.47 1352.24N 202.24E 1026.24 1109.22 1195.37 1282.22 1367.27 ORIGINAL Alaska Oil & Gas 6ons. Cornmissiun Anchorage SPA. f-SUN DRILLING SERVICES ANCHOR_AGE ALASKA PAGE BP EXPLORATION MILNE POINT / MPG-13 500292278300 NORTH SLOPE BOROUGH COMPUTATION DATE: 7/28/97 DATE OF SURVEY: 071797 MWD SURVEY JOB NUMBER: AK-MM-70204 KELLY BUSHING ELEV. = 58.60 OPERATOR: BP EXPLORATION FT. TRUE SUB-SEA MEASD VERTICAL VERTICAL DEPTH DEPTH DEPTH COURS INCLN DG MN COURSE DLS TOTAL DIRECTION RECTANGULAR COORDINATES DEGREES DG/100 NORTH/SOUTH EAST/WEST VERT. SECT. 3239.05 2580.97 2522.37 3331.72 2614.92 2556.32 3425.97 2647.31 2588.71 3517.99 2674.68 2616.08 3610.11 2698.80 2640.20 68 30 68 30 71 16 74 6 75 32 N 11.99 E 2.46 1437.61N 219.06E N 11.03 E .96 1522.10N 236.26E N 10.25 E 3.04 1609.08N 252.60E N 8.37 E 3.64 1695.77N 266.80E N 7.52 E 1.79 1783.81N 279.08E 1454.16 1540.24 1628.66 1716.49 1805.38 3703.58 2721.65 2663.05 3797.19 2745.72 2687.12 3889.39 2772.24 2713.64 3984.35 2801.96 2743.36 4079.65 2830.65 2772.05 76 9 74 1 72 31 71 0 73 56 N 8.12 E .91 1873.60N 291.41E N 8.05 E 2.28 1963.15N 304.14E N 8.90 E 1.85 2050.47N 317.14E N 8.98 E 1.61 2139.56N 331.16E N 7.93 E 3.27 2229.44N 344.51E 1896.01 1986.46 2074.75 2164.92 2255.79 4174.89 2856.49 2797.89 4270.10 2882.16 2823.56 4367.31 2908.71 2850.11 4462.35 2934.27 2875.67 4557.66 2959.16 2900.56 74 34 74 9 74 9 74 38 75 5 N 8.34 E .77 2320.18N 357.48E N 5.58 E 2.83 2411.18N 368.60E N 6.96 E 1.37 2504.13N 378.81E N 7.19 E .57 2594.97N 390.08E N 7.25 E .48 2686.24N 401.65E 2347.46 2439.11 2532.56 2624.08 2716.07 4653.03 4749.22 4843.49 4939.99 5035 23 2983.33 2924.73 3007.94 2949.34 3034.72 2976.12 3065.80 3007.20 3097.83 3039.23 75 33 74 48 72 11 70 13 70 27 N 7.14 E .50 2777.77N 413.20E N 6.82 E .84 2870.07N 424.50E N 6.14 E 2.85 2959.87N 434.70E N 6.31 E 2.04 3050.67N 444.61E N 6.48 E .29 3139.81N 454.60E 2808.31 2901.28 2991.61 3082.90 3172.55 5130 82 5227.29 5323 67 5419.-60 5514 00 3131.85 3073.25 3168.67 3110.07 3205.73 3147.13 3242.43 3183.83 3278.67 3220.07 67 50 67 17 67 28 67 31 67 19 N 6.59 E 2.74 3228.55N 464.76E N 6.03 E .78 3317.18N 474.56E N 6.71 E .68 3405.59N 484.43E N 7.30 E .57 3493.56N 495.24E N 7.19 E .25 3580.03N 506.24E 3261.83 3350.95 3439.87 3528.48 3615.63 5610 26 5705.12 5800 30 5896.18 5992.24 3316.13 3257.53 3353.48 3294.88 3393.39 3334.79 3438.91 3380.31 3488.59 3429.99 66 52 66 45 63 39 59 38 58 3 N 6.71 E .66 3668.05N 516.97E N 7.16 E .45 3754.61N 527.49E N 7.90 E 3.33 3840.26N 538.81E N 7.10 E 4.26 3923.90N 549.83E N 6.84 E 1.66 4005.50N 559.81E 3704.28 3791.46 3877.85 3962.21 4044.39 6088.02 6184.33 6279.08 6373.89 6469.37 3540.95 3482.35 3596.04 3537.44 3651.34 3592.74 3708.61 3650.01 3769.95 3711.35 55 39 54 34 54 0 51 39 48 23 N 7.79 E 2.65 4085.02N 570.01E N 7.33 E 1.19 4163.33N 580.40E N 7.74 E .69 4239.60N 590.49E N 8.47 E 2.56 4314.38N 601.13E N 8.09 E 3.43 4386.77N 611.67E 4124.55 4203.54 4280.47 4356.00 4429.16 · ~ S PE ~ PAGE 3 -'-SUN DRILLING SERVICES ANCHORAGE ALASKA BP EXPLORATION MILNE POINT / MPG-13 500292278300 NORTH SLOPE BOROUGH COMPUTATION DATE: 7/28/97 DATE OF SURVEY: 071797 MWD SURVEY JOB NUMBER: AK-MM-70204 KELLY BUSHING ELEV. = 58.60 FT. OPERATOR: BP EXPLORATION TRUE SUB-SEA COURS COURSE DLS TOTAL MEASD VERTICAL VERTICAL INCLN DIRECTION RECTANGULAR COORDINATES VERT. DEPTH DEPTH DEPTH DG MN DEGREES DG/100 NORTH/SOUTH EAST/WEST SECT. 6563.80 3834.46 3775.86 45 24 N 8.52 E 3.17 4454.98N 621.62E 4498.10 6658.42 3902.74 3844.14 42 12 N 7.99 E 3.41 4519.79N 631.04E 4563.58 6753.82 3974.60 3916.00 40 2 N 9.54 E 2.50 4581.78N 640.58E 4626.30 6849.60 4048.11 3989.51 39 41 N 11.54 E 1.39 4642.13N 651.80E 4687.64 6945.24 4121.99 4063.39 39 9 N 11.75 E .57 4701.62N 664.06E 4748.26 7040.84 4196.26 4137.66 38 52 N 11.72 E .29 4760.55N 676.30E 4808.34 7136.05 4270.61 4212.01 38 25 N 10.54 E .91 4818.90N 687.78E 4867.73 7232.17 4346.18 4287.58 37 55 N 10.63 E .53 4877.30N 698.70E 4927.08 7327.38 4421.48 4362.88 37 32 N 10.67 E .40 4934.55N 709.46E 4985.29 7342.41 4433.40 4374.80 37 26 N 11.24 E 2.40 4943.54N 711.20E 4994.43 7421.00 4495.80 4437.20 37 26 N 11.24 E .00 4990.40N 720.51E 5042.14 THE CALCULATION PROCEDURES ARE BASED ON THE USE OF THREE--DIMENSION MINIMUM CURVATURE METHOD. HORIZONTAL DISPLACEMENT = 5042.14 FEET AT NORTH 8 DEG. 12 MIN. EAST AT MD = 7421 VERTICAL SECTION RELATIVE TO WELL HEAD VERTICAL SECTION COMPUTED ALONG 8.21 DEG. TIE-IN SURVEY AT SURFACE 0.00' MD PROJECTED SUREY AT 7,421.00' MD SPE. f-SUN DRILLING SERVICES ANCHOR_AGE ALASKA PAGE BP EXPLORATION MILNE POINT / MPG-13 500292278300 NORTH SLOPE BOROUGH COMPUTATION DATE: 7/28/97 DATE OF SURVEY: 071797 JOB NUMBER: AK-MM-70204 KELLY BUSHING ELEV. = 58.60 OPERATOR: BP EXPLORATION FT. INTERPOLATED VALUES FOR EVEN 1000 FEET OF MEASURED DEPTH TRUE SUB-SEA TOTAL MEASD VERTICAL VERTICAL RECTANGULAR COORDINATES MD-TVD DEPTH DEPTH DEPTH NORTH/SOUTH EAST/WEST DIFFERENCE VERTICAL CORRECTION .00 .00 -58.60 .00 N .00 E .0 1000.00 997.33 938.73 43.99 N 11.82 E 2.6 2000.00 1903.41 1844.81 440.70 N 70.62 E 96.5 3000.00 2497.39 2438.79 1217.18 N 179.74 E 502.6 4000.00 2806.99 2748.39 2154.20 N 333.45 E 1193.0 2.67 93.92 406.02 690.40 5000.00 3086.05 3027.45 3106.82 N 450.85 E 1913.9 6000.00 3492.70 3434.10 4012.04 N 560.59 E 2507.3 7000.00 4164.47 4105.87 4735.45 N 671.09 E 2835.5 7421.00 4495.80 4437.20 4990.40 N 720.51 E 2925.2 720.94 593.35 328.23 89.67 THE CALCULATION PROCEDURES ARE BASED ON THE USE OF THREE-DIMENSION MINIMUM CURVATURE METHOD. SPE. f-SUN DRILLING SERVICES ANCHORAGE ALASKA PAGE BP EXPLORATION MILNE POINT / MPG-13 500292278300 NORTH SLOPE BOROUGH COMPUTATION DATE: 7/28/97 DATE OF SURVEY: 071797 JOB NUMBER: AK-MM-70204 KELLY BUSHING ELEV. = 58.60 FT. OPERATOR: BP EXPLORATION INTERPOLATED VALUES FOR EVEN 100 FEET OF SUB-SEA DEPTH TRUE SUB-SEA MEASD VERTICAL VERTICAL DEPTH DEPTH DEPTH TOTAL RECTANGULAR COORDINATES NORTH/SOUTH EAST/WEST MD-TVD VERTICAL DIFFERENCE CORRECTION .00 .00 -58.60 58.60 58.60 .00 158.60 158.60 100.00 258.61 258.60 200.00 358.61 358.60 300.00 .00 N .00 E .00 .00 N .00 E .00 .00 .03 S .02 W .00 .00 .91 S .56 W .01 .01 .79 S .89 W .01 .00 458.61 458.60 400.00 558.65 558.60 500.00 658.76 658.60 600.00 759.03 758.60 700.00 859.57 858.60 800.00 .03 N .62 W .01 .01 2.09 N .67 E .05 .03 6.13 N 2.99 E .16 .11 12.73 N 5.75 E .43 .27 22.80 N 7.98 E .97 .55 960.65 958.60 900.00 1062.49 1058.60 1000.00 1165.41 1158.60 1100.00 1269.36 1258.60 1200.00 1374.95 1358.60 1300.00 37.14 N 10.75 56.20 N 13.26 80.37 N 15.71 108.48 N 19.31 142.01 N 23.87 2.05 1.08 3.89 1.84 6.81 2.92 10.76 3.95 16.35 5.59 1483.78 1458.60 1400.00 1594.83 1558.60 1500.00 1707.23 1658.60 1600.00 1822.99 1758.60 1700.00 1944.19 1858.60 1800.00 184.42 N 30.04 232.26 N 36.60 283.15 N 43.20 340.78 N 51.70 408.06 N 64.17 25.18 8.83 36.23 11.05 48.63 12.41 64.39 15.76 85.59 21.20 2069.10 1958.60 1900.00 2198.59 2058.60 2000.00 2338.28 2158.60 2100.00 2492.61 2258.60 2200.00 2672.79 2358.60 2300.00 481.60 N 78.10 562.51 N 92.73 658.91 N 106.92 775.54 N 120.73 924.09 N 139.61 110.50 24.91 139.99 29.49 179.68 39.69 234.01 54.33 314.19 80.18 2895.91 2458.60 2400.00 3176.83 2558.60 2500.00 3462.21 2658.60 2600.00 3843.72 2758.60 2700.00 4182.82 2858.60 2800.00 1121.72 N 165.02 1380.74 N 207.42 1643.01 N 258.50 2007.41 N 310.44 2327.75 N 358.57 437.30 123.12 618.23 180.92 803.61 185.39 1085.12 281.51 1324.22 239.10 4555.49 2958.60 2900.00 4918.71 3058.60 3000.00 5201.21 3158.60 3100.00 5461.89 3258.60 3200.00 5717.96 3358.60 3300.00 2684.16 N 401.38 3030.77 N 442.41 3293.26 N 472.04 3532.33 N 500.21 3766.29 N 528.97 E 1596.89 272.67 E 1860.11 263.22 E 2042.61 182.50 E 2203.29 160.68 E 2359.36 156.07 SPE. _f-SUN DRILLING SERVICES ANCHORAGE ALASKA PAGE BP EXPLORATION MILNE POINT / MPG-13 500292278300 NORTH SLOPE BOROUGH COMPUTATION DATE: 7/28/97 DATE OF SURVEY: 071797 JOB NUMBER: AK-MM-70204 KELLY BUSHING ELEV. = 58.60 FT. OPERATOR: BP EXPLORATION INTERPOLATED VALUES FOR EVEN 100 FEET OF SUB-SEA DEPTH TRUE SUB-SEA TOTAL MEASD VERTICAL VERTICAL RECTANGULAR COORDINATES MD-TVD DEPTH DEPTH DEPTH NORTH/SOUTH EAST/WEST DIFFERENCE VERTICAL CORRECTION 5935.15 3458.60 3400.00 3957.27 N 553.99 E 2476.55 6119.30 3558.60 3500.00 4110.61 N 573.51 E 2560.70 6291.44 3658.60 3600.00 4249.50 N 591.84 E 2632.84 6452.15 3758.60 3700.00 4373.94 N 609.84 E 2693.55 6597.82 3858.60 3800.00 44'78.71 N 625.14 E 2739.22 117.19 84.16 72.13 60.71 45.68 6732.93 3958.60 3900.00 4568.53 N 638.35 E 2774.33 6863.23 4058.60 4000.00 4650.66 N 653.54 E 2804.63 6992.44 4158.60 4100.00 4730.78 N 670.12 E 2833.84 7120.71 4258.60 4200.00 4809.53 N 686.04 E 2862.11 7247.92 4358.60 4300.00 4886.81 N 700.48 E 2889.32 35.10 30.30 29.21 28.28 27.21 7374.14 4458.60 4400.00 4962.46 N 714.96 E 2915.54 7400.00 4479.13 4420.53 4977.88 N 718.03 E 2920.87 26.22 5.33 THE CALCULATION PROCEDURES USE A LINEAR INTERPOLATION BETWEEN THE NEAREST 20 FOOT MD (FROM MINIMUM CURVATURE) POINTS State of Alaska Alaska Oil & Gas Conservation Comm. Atten' Lori Taylor 3001 Porcupine Drive Anchorage, AK 99501 12-Jun-98 Transmittal of Final Prints. Please sign and return copy to the following: Western Altas Logging Services Pouch 340013 Prudhoe Bay, AK 99734-0013 and BP Exploration (Alaska) Inc. Petrotechnical Data Center MB 3-3 900 E. Benson Blvd. Anchorage, AK 99519-6612 Services Bluelines R/F Sepia Film /~/ppell Name G-13 G-13 SBT/GR/CCL 1 CCL/GR PERF, PACKER 1 MPH-13 CCL PERF 1 MPH-13 CCL PERF 1 '~'MPH-13 GR/CCL DEPTH REF 1 PH-13 STATIC PRESS SRVY PI-05 ~/~ INJ PROFILE /MPB-25 ~/4-.-- INJ PROFILE PK-30 PH-13 1 CCL PERF 1 1 GR/CCL PERF, PACKER 1 /~rMPH-08 GR/CCL PERF 1 /I~PG-13 GR/CCL PERF - 1 Received by: ~ Date . . . - ~..~.~ ~ h.~ ~-~.~ .'_-~.,'..;:'~ ,._ .. . .... : ........... ~.. ...... Contact Rebecca Lange if you have a question concerning this transmittal at (907) 659-2816 or Fax (907) 659-2602. WELL LOG TRANSMITFAL To: State of Alaska Alaska Oil and Gas Conservation Comm. Atm.: Loft Taylor 3001 Porcupine Dr. Anchorage, Alaska 99501 MWD Formation Evaluation Logs - ot.1...,9° MPG-13 AK-MM-70204 September 17, 1997 The technical data listed below is being submitted herewith. Please acknowledge receipt by returning a signed copy of this transmittal letter to the attention of. Jun Galvi~ Sperry-Sun Drilling Services, 5631 Silverado Way, #G, Anchorage, AK 99518 1 LDWG formatted Disc with verification listing. A[~: 50-029-22782-00 E RECEiVE SEP 1 7 1997 vii & Gas'" ' Ancfl0r~e 5631 Silverado Way, Suite G · Anchorage, Alaska 99518 · (907) 563-3256 · Fax (907) 563-7252 A Dresser Industries, Inc. Company CI F:! I I--I--I IM G SEFIL/ICE S WELL LOG TRANSMITFAL To: State of Alaska Alaska Oil and Gas Conservation Comm. Atm.: Loft Taylor 3001 Porcupine Dr. Anchorage, Alaska 99501 q q' I ~O MWD Formation Evaluation Logs - MPG-13, AK-MM-70204 September 17, 1997 The technical data listed below is being submitted herewith. Please acknowledge receipt by returning a signed copy of this transmittal letter to the attention of.' Jun Galvin, Sperry-Sun Drilling Services, 5631 Silverado Way, #G, Anchorage, AK 99518 MPC~13: 2" x 5" MD Resistivity and Gamma Ray Logs: 50-029-22782-00 2" x 5" TVD Resistivity and Gamma Ray Logs: 50-029-22782-00 1 Blueline 1 Rev. Folded Sepia 1 Blueline 1 Rev. Folded Sepia SEP !7 5631 Silverado Way, Suite G · Anchorage,/Naska 99518 ° (9.07) 563-3256 ° Fax (907) 563-7252 A Dresser Industries, Inc. Company TONY KNOWLE$, GOVEFtNOFt ~kLASi~& OIL AND GAS CONSERVATION COMMISSION 3001 PORCUPINE DRIVE ANCHORAGE, ALASKA 99501-3192 PHONE: (907) 279-1433 FAX: (907) 276-7542 June 19,1997 Tim Schofield Senior Drilling Engineer BP Exploration (Alaska), Inc. PO Box 196612 Anchorage, AK 99519-6612 ae~ Milne Point MPG- 13 BP Exploration (Alaska). Inc. Permit No. 97-120 Sur. Loc: 1956'NSL.3439'WEL. SEC 27.TI3N.RIOE. UM Btmholc Loc: 1564'NSL.2724'WEL.SEC 22.T 13N.R 10E. UM Dear Mr. Schoficld: Encloscd is thc approvcd application for pcrmit to drill thc abovc rcfcrcnccd wcll. Thc pcrmit to drill docs not cxcmpt you from obtaining additional pcrmits rcquircd by laxv from other governmental agcncics, and docs not authorize conducting drilling opcrations until all other rcquircd permitting dctcrminations arc madc. Blowout prcvcntion cquipmcnt (BOPE) must bc tcstcd in accordancc x¥ith 20 AAC 25.035. Sufficient notice (approximately 24 hours) of thc BOPE tcst pcrformcd bcforc drilling bclow thc surface casing shoe must bc givcn so that a rcprcscntativc of thc Commission may xvitncss the tcst. Noticc may be givcn by contacting thc Commission pctrolcum ficld inspcctor on the North Slope pager at 659-3607. David ohnston Chairman BY ORDER OF THE COMMISSION dl17 cnclosttrcs Department of Fish & Game. l labitat Section w o cncl. l)cpartment ot' Envitmmmct~t Conservation w. o cncl. --, STATE OF ALASKA ALASKA O,_ AND GAS CONSERVATION COMb,..SION PERMIT TO DRILL 20 AAC 25.005 la. Type of work [] Drill [] Redrill Ilb. Type of well [] Exploratory [] Stratigraphic Test [] Development Oil [] Re-Entry [] Deepenl [] Service [] Development Gas [] Single Zone [] Multiple Zone 2. Name of Operator 15. Datum Elevation (DF or KB) 10. Field and Pool BP Exploration (Alaska) Inc. Plan RTE = 59.10' Milne Point Unit / Schrader Bluff 3. Address 6. Property Designation P.O. Box 196612, Anchorage, Alaska 99519-6612 ADL 025516 4. Location of well at surface 7. Unit or Property Name 11. Type Bond (See 20 AAC 25.025) 1956' NSL, 3439' WEL, SEC. 27, T13N, R10E, UM Milne Point Unit At top of productive interval 8. Well Number Number 2S100302630-277 1314' NSL, 2761' WEL, SEC. 22, T13N, R10E, UM MPG-13 At total depth 9. Approximate spud date Amount $200,000.00 1564' NSL, 2724' WEL, SEC. 22, T13N, R10E, UM 07/13/97 12. Distance to nearest property line113. Distance to nearest well 14. Number of acres in property 15. Proposed depth (MD and TVD) ADL 025906, 1564'I No Close Approach 2560 7441' MD / 4435' TVD 16. To be completed for deviated wells 17. Anticipated pressure {see 20 AAC 25.035 (e) (2)} Kick Off Depth 400' Maximum Hole Angle 76.03° Maximum surface 1380 psig, At total depth ('I'VD) 4200' / 1800 psig 18. Casing Program Specifications Setting Depth Size Top Bottom Quantity of Cement Hole Casing Weight Grade Coupling Length MD TVD MD TVD (include stage data) 24" 20" 91.4# H-40 Weld 80' 32' 32' 112' 112' 250 sx Arcticset I (Approx.) 8-1/2" 7" 26# L-80 BTC-Mod 7410' 31' 31' 7441' 4494' 730 sx PF 'E', 113 sx Class 'G' 19. To be completed for Redrill, Re-entry, and Deepen Operations. Present well condition summary Total depth: measured feet Plugs (measured) true vertical feet Effective depth: measured feet Junk (measured) true vertical feet Casing Length Size Cemented MD TVD Structural Conductor Surface Intermediate Production REcEiVED Liner depth: OR/G/N/kL ' ktask~ Oil & Gas Cons. C0rr~missi0r~ Perforation measured Anchorago true vertical 20. Attachments [] Filing Fee [] Property Plat [] BOP Sketch [] Diver[er Sketch [] Drilling Program [] Drilling Fluid Program []Time vs Depth Pict [] Refraction Analysis [] Seabed Report [] 20 AAC 25.050 Requirements Contact Engineer Name/Number: Mark Brofka, 564-4809 Prepared By Name/Number: Kathy Campoamor, 564-5122 21 I hereby certify that · the foregoing is jtrue and/c~rrect to the best of my knowledge Signed ~¢/ ~'C'¢/~-y/~' ~0/3// Tim Schofield Title Senior Drilling Engineer Date 7- Commission Use Only Permit Number I AP, Number I Apprgva,pate J See cover letter ./~'~-,/..2 C::) 50- C~.2_ ~ -- .~...2.. ~ ~'.~__. ~//~)/~ ? for other requirements Conditions of Approval: Samples Required J--lYes .J~]No Mud Log Requi~d/ []Yes J~JNo Hydrogen Sulfide Measures []Yes ~No Directional Survey Required []Yes [] No Required Working Pressure for BOPE ,JJ~J2M; 1-13M; l-ISM; I-IIOM; I-I15M Other: 0riglnal blgi--' by order of Approved By David W. dohnstor, Commissioner the commission Date ,,.r/ l // / -. Form 10-401 Rev. 12-01-85 Subrr plicate Shared Services Drilling Contact: I Well Name: Mark J. Brofka I MPG-13 Well Plan Summary IType of Well (producer or injector): SCHRADER BLUFF PRODUCER 564-4809 fSurface Location: Target Location: Bottom Hole Location: 1956 FSL, 3439 FEL, S27 T13N R10E UM 1314 FSL, 2761 FEL, S22 T13N R10E UM 1564 FSL, 2724 FEL, S22 T13N R10E UM I AFE Number: I 337083 Rig: Nabors 22E I Estimated Start Date: I 13 July 1997 I I Operating days to complete: 19.o IMD: I7441' I ITVD: I4435' I I KBE: I 59.10 I Well Design: Schrader Bluff Producer Formation Markers: Formation Tops MD TVD (bkb) KOP 400 400 Base of Permafrost 1848 1784 Top of Ugnu 6295 3546 Top M Sand 6640 3806 Top NA (Target) 6936 4057 Top of Schrader Bluff Sands (EMW 8.6 ppg) NB 6974 4090 NCND 7002 4114 NE 7O33 4141 NF 7090 4190 OA 7128 4223 OA4 7167 4257 OB 7208 4293 Top of Seabee 7241 4494 Base of Schrader Bluff Sands (EMW 8.3 ppg) TD 7441 4494 TD at 200' MD past base of Schrader Casing/Tub lng Program: Hole ~,ize ' Csg~ Wt/Ft Grade Conn. Length Top Bottom Tbg O.D. MD/TVD MD/TVD (bkb) 24" 20" 91.4# H-40 Weld 80' 32'/32' 112' / 112' 8-1/2" 7" 26# L80 BTC-MOD 7,410' 31'/31' 7,441' / 4,494' Internal yield pressure of the 7" 26# casing is 7240 psi. With a full column of gas (0.10 psi/ft) to the reservoir at 4- ' _4200 TVDSS, the maximum anticipated surface pressure assuming a reservoir pressure of 1800 psi (8.65 ppg EMW), is 1380 psi, well below the internal yield pressure rating of the 7" casing. RECEIVED Alaska 0il & Gas Cons. Commission Anchorage Logging Program: Open Hole Logs: Cased Hole Logs: Mudloggers are NOT rec MWD from surface to TD LWD (GR/Resistivity) from top of Ugnu to TD with a controlled drilling speed of no more than 200 fi/hr from 6295 - 7441' MD. Drop ESS survey tool at TD to correlate with MWD surveys. RFT log, drillpipe-conveyed (specific RFT program will be submitted to the rig prior to logging operations) NONE GR/CCL in production casing with completion rig) uired for this well. Mud Program: Spud Mud ISpecial design considerations ISee "Drilling Hazards and Risks" section about dealing with the possibility of hydrates SPUD TO TOP OF SCHRADER BLUFF: I Density Marsh Yield 10 sec 10 min pH Fluid (PPG) Viscosity Point gel gel Loss 8.5 80 15 8 10 9 10-15 (initial) to to to to to to to 9.0 100 35 15 30 10 8-10 (final) TOP OF SCHRADER BLUFF TO TD: ! LSND freshwater mud Density Marsh Yield 10 sec 10 min pH Fluid (PPG) Viscosity Point gel gel Loss 9.0 50 10 3 7 9.0 4 to to to to to to to 9.3 80 (as 20 10 20 9.5 6 required) Well Control: Well control equipment consists of: Drilling Rig (Nabors 22E) 21-1/4", 2000 psi W.P. Diverter with 10" Diverter Line. Completion Rig with 5000 psi W.P. pipe rams, blind/shear rams, and annular preventer will be installed and is capable of handling maximum potential surface pressures. Diverter, BOPE, and drilling fluid system schematics on file with AOGCC. Directional: I KOP: I 400', Phased Build and Drop, S-shaped tMaximum Hole Angle: Close Approach Well: 76.03° NONE Waste Management: Cuttings Handling: All cuttings will be hauled to the CC-2A facility. In the event that the bridges are not usable due to breakup, all cuttings will be placed in the Milne Point A-Pad reserve pit. Fluids Handling: All drilling and completion fluids will be hauled to CC-2A for injection. If the bridges over the rivers are not usable because of breakup, class 2 waste fluids will be hauled to the Kuparuk injection well and class 1 fluids will be transferred to storage tanks for future disposal after breakup. Annular Injection: No wells on G-Pad have been permitted for annular injection. MP G-13 Proposed Summary of Operations . 2. 3. 4. 5. . . . 10. 11. 12. 13. 14. 15. 16. Drill and Set 20" Conductor. Weld a starting head and top job nipple on conductor. Prepare location for rig move. MIRU Nabors 22E drilling rig. N/U and function test 21-1/4" Hydril MSP 2M diverter system. Build Spud Mud. Drill an 8-1/2" surface hole as per directional plan to 7411' MD/4494' TVD. Run Directional MWD and LWD GR/Res from surface to TD. Change MWD when tripping for the second bit and drill at a controlled rate of no more than 200 fi/hr through the Schrader Bluff sands. At TD, make a wiper trip to the last bit trip depth and condition hole, making sure to record any tight spots. Run and cement 7", 26#, L80, BTC-MOD casing. Cement job will be performed in two (2) stages, as per the cement program, with an ES cementer set at least 200' MD below the permafrost. N/D Diverter. N/U FMC Gen 6 Wellhead and Tree. RDMO Nabors 22E drilling rig to drill next well. (End of Nabors 22E operations) MIRU completion rig. N/U & Test BOPE. Drill out ES cementer and clean out the well. Run GR/CCL tool. Complete well with RCP completion. Set BPV. N/D BOP stack and N/U X-mas tree. RDMO with completion rig. Install Surface Lines and Wellhouse and turn well over to production. DRILLING HAZARDS AND RISKS: The well is planned as a Schrader Bluff single casing string producer. The well will be drilled, cased, and cemented with Nabors 22E which will then suspend the well and move on. The well will be completed at a later date by a completion rig. See the latest Milne Point G-Pad Data Sheet prepared by Pete Van Dusen for information on G pad. The MPU PE group MAY be perforating, hydraulic fracturing and cleaning out wells shortly after the rig drills and completes them. This will make the near rig area congested and as a result potentially hazardous. Ensure personnel use caution moving around adjacent production activities. .1 ..Hydrates: Hydrates have occurred on nearby E and H pads and there is a possibility that hydrates may be encountered in the drilling of MPG-13. In the eight wells previously drilled on G-pad, only G-8 encountered gas-cut mud, but only a minor amount. Hydrates on MPG-13 are not expected, but if hydrates are encountered, mud weights will be increased to 10.2 ppg, or heavier if required, and lecithin (DrillTreat) will be added to the mud system. The cement program includes an ES cementer set below the permafrost. Should hydrates be encountered while drilling, the cement program will be modified to include a Permafrost C tail on the second stage to ensure a high quality cement seal above the hydrate zones. Also, weighted spacers will be used during the cement displacement to maintain the hydrostatic head on the formation so as to prevent the movement of hydrates into the wellbore. 2. Close Approach: There are no close approach problems with MPG-13. 3. Lost Circulation: Lost circulation has been experienced when drilling the Schrader sands and can be countered by having LCM on hand. To date, losses seen on past wells in the area have been minor. 4. Stuck Pipe Potential: No stuck pipe incidents have occurred on G Pad to date, but the rig crew should remain attentive and take precautions to prevent stuck pipe from occurring. If heavy gravels are encountered, operations should be immediately stopped while the mud funnel viscosity is increased to 150 cp and maintained through the gravel section. 5. Formation Pressure: The expected pore pressure for this well is 8.6 ppg EMW in the Schrader Bluff NA and NB sands, and 8.3 ppg EMW at TD just past the OB sands. 6. Directional Drillinc~ Concerns Also, due to the relatively shallow depth of the Schrader Bluff wells and the large stepouts, some directional drilling will have to be done in the permafrost. The rig crew should be particularly attentive to the wellbore trajectory to ensure that the target objectives are met. Note that care must be taken when drilling through the base of the permafrost as severe doglegs may develop. Also, the producer wells will have a high sail angle and then drop into the reservoir section to allow for the completion. 7. Other There h,~ve been only a handful of wells drilled on the North Slope with an 8-1/2" surface hole and it is important that bit and directional performance is closely monitored and reported so that lessons learned can be included in the next well program. None of the drilling hazards and risks identified above are expected to be magnified by the change in hole size. MPG-13 7" SURFACE CASING CEMENT PROGRAM - HALLIBURTON CASING SIZE: 7" CIRC. TEMP SPACER: 50 bbls fresh water spacer (1307' in 7" casing). : STAGE1 LEAD: ADDITIVES: WEIGHT: APPROX #SACKS: TYPE 'E' PERMAFROST Retarder + CELLO-FLAKES (0.25 Ib/sk) 12.0 ppg YIELD:2.17 ft3/sk MIX WATER: 11.63 gal/sk 311 SACKS THICKENING TIME: Greater than 4 hrs at 50° F. ANNULAR VOLUME FROM THE GREATER OF EITHER 100' TVD OR 500' MD ABOVE THE TOP OF THE UGNU "M" SANDS (6140' MD) TO THE ES CEMENTER STAGE TOOL (2050' MD > 200' MD BELOW BASE OF PERMAFROST) + 30% EXCESS. STAGE1 TAIL CEMENT TYPE: ADDITIVES: WEIGHT: APPROX #SACKS: FLUID LOSS: PREMIUM SILICATE (15 #/sk), CFR-3 (0.2%), HALAD-344 (0.75%) 13.1 ppg YIELD:2.05 ft3/sk MIX WATER: 11.0 gal/sk 113 SACKS THICKENING TIME: Greater than 4 hrs at 50° F. 0-55 cc/30min TAIL CEMENT FROM TD (7411' MD) TO THE GREATER OF EITHER 100' TVD OR 500' MD ABOVE THE TOP OF THE UGNU "M" SANDS (6140' MD) + 30% EXCESS + 80' OF 7" 26# CASING CAPACITY FOR SHOE TRACK. STAGE2: ADDITIVES: WEIGHT: APPROX #SACKS: TYPE 'E' PERMAFROST Retarder 12.0 ppg 419 SACKS YIELD:2.17 ft3/sk MIX WATER: 11.63 gal/sk THICKENING TIME: Greater than 4 hrs at 50° F. PUMP UNTIL RETURNS ARE OBSERVED AT SURFACE BEFORE DROPPING CLOSING PLUG. +/- 250% EXCESS IS EXPECTED FROM THE ES CEMENTER TO SURFACE. WELLHEAD STABILITY CEMENT TYPE: Permafrost E NOTE: ADDITIVES: Retarder WELLHEAD STABILITY CEMENT WILL BE PUMPED ONLY IF THE CEMENT TOP FALLS BELOW SURFACE AFTER THE PUMPS ARE SHUT DOWN. WEIGHT: 12.0 ppg YIELD:2.17 ft3/sk MIX WATER: 11.63 gal/sk APPROX NO SACKS: 150 RECIPROCATE CASING STRING WHILE CEMENTING IF POSSIBLE/PRACTICAL CENTRALIZER PLACEMENT: 1. Centralize the casing from TD to 100' MD above Ugnu "M" Sands with 7-1/8" x 8-1/4" Rigid Straight Blade Centralizers - two (2) per joint on the bottom twenty-three (23) joints of 7" casing (46 Rigid Straight Blade Centralizers). 2. Run two (2) Rigid Straight Blade Centralizers on either side of the ES cementer tool. OTHER CONSIDERATIONS: Perform any necessary laboratory tests on samples of the water to be used in the cement job to ensure that it is adequate. Also perform lab tests on mixed cement/spacer/mud program and ensure compatibility prior to pumping job. Ensure thickening times are adequate relative to pumping job requirement. Displace at 4.5 - 6.0 bpm - pump rates are crucial to keep ECD's Iow. Mix slurry on the fly -- batch mixing is not necessary. Be sure to keep detailed records of the cement job, and to report the amount of returns seen from both stages so that volumes can be modified on future wells if necessary. CEMENT VOLUME: I st Stage: 1. The lead slurry volume is calculated to cover from the ES cementer tool (200' MD below base of permafrost) to the top of the tail slurry, at the greater of either 500' MD or 100' TVD above the top of the Ugnu "M' Sands, with 30% excess. 2. The tail slurry volume is calculated to cover the greater of either 500' MD or 100' TVD above the top of the Ugnu "M' Sands to TD with 30% excess. 3. 80' of 7", 26# capacity for the float joints (baffle collar, float collar, and float shoe). 2nd Stage: 1. The slurry volume is calculated to cover from the ES cementer to surface with an excess of 250% expected to be required. Ensure that additional sacks of cement are onsite and available for use The slurry will be pumped until cement returns are seen at surface. Note that in the event that hydrates are encountered, the Operations Drilling Engineer should be notified and a modified cement program will be submitted to ensure isolation of the hydrate zone. DISPLACEMENT OF CEMENT: Because Nabors 22E will be moving off of the well after the cement job, displacement fluid is an important consideration as the fluid will be left in the hole for some time. The proposed displacement procedure is as follows: 1. Pump away first stage as per the detailed cement program and displace with seawater a volume equal to the capacity of the 7" casing from TD up to surface. 2. After bumping the plug, quickly check to ensure that the floats are holding and then shear the ES cementer to the open position. 3. Circulate seawater through the ES cementer for two hours to clean and condition the contaminated cement. 4. Pump the second stage as per the detailed cement program, circulating the water through the ES cementer and across the permafrost to surface. When cement returns are seen at surface, drop the second stage plug and displace with diesel. The completion rig will recover the diesel freeze protection fluid for reuse on another well. Anadr£1] Schlumberger Alaska DiStrict 1111 East 80th Avenue A3~chorage, AK 99510 (907) 349-4511 Fax 344-2160 DERECTIONAb ~HLL PLAR for SHARED SERVICES DRILLING well ......... : MPG-13(P03) Field ........ : Milne Point, G-Pad Co~utation..: Minimum Curvature UnitB ........ : FEST Surface Lat..: 70.44995419 N Surface bong.: 149,53362106 W Legal Description Surface ...... : 1955 FSh 3439 [~13L S27 T13N RiOB UM Target ....... : 1314 PSL 276£ FEL S22 T13N RiOH UM B~T. .......... : 1564 FSL 2724 FEL S22 T13N RIOH UM LOCATIONS - AI~KA Zooe= 4 X-Ooord Y-Coord 557L64.45 601439L.15 ~57~98.00 6019035.00 557832.12 6019285.08 PROPOSED WRL,L PROFIL~ STATION MEASURED INC~N DIRECTION /DHNTIFICATION DEPTH ANGLE AZIMUTH ~RT£CAL- D~PTHS KB 0-O0 0.00 0.00 0.00 -59.10 KDP/BUILD //100 400.00 0.00 0.00 4DO.00 340.90 500.00 1.00 8.21 499.99 440.89 BUILD L.75/300 600.00 2.00 8.21 599.96 540.86 700.00 3.75 8.21 699.83 640.73 8ECTION DEPART 0.00 0.00 O.87 3.49 8.5l BUXLD 2.5/3oo 800.00 5.50 8.21 900.00 8.00 8.21 I000-00 10-50 8.21 1100.00 13.00 8.21 ~200.00 15.50 8-21 799.50 740.40 16.57 898.80 B39.70 28.32 99~.49 938.39 44.39 1095.39 L036.29 64.76 £L92.30 L133.20 89.37 L300.O0 18.00 1400-00 20.50 8.21 1288.05 L228.95 118.19 8.23 L382.45 L323.35 151.35 Prepared ..... : 09 Jun 1997 Vert sect az-: 8,2L K~ elevation.: 59.L0 ft Magnetic Dcln: +28.045 (~) Scale Factor.: Convergence..: + .4AN~iLL AKA-DPC APPROVED FOR PERMITTING ONLY COORDINATRS-PROM ALASKA Zone 4 WHLL~AD X Y 0.00 N 0.00 B 557164,45 6014391.~4 0.0O N 0.00 B 557164.4~ 6014391.£4 0.86 N 0.12 B 557164,57 6014392.00 3.45 N 0,50 ~ 557164,92 6014394.60 8.42 N L.21 H 557165.60 6014399.57 · OOL Db/ PAC~ 100 RS 0.00 8R 0.00 8R ~.00 8R £.00 8R L.75 16.40 N 2.37 H 557166.69 6014407.56 HS 1.75 28.03 N 4.04 B 557168.28 60L4419.20 HS 2.50 43.94 N 6.34 ~ 557170,45 6014435.12 HS 2.50 64-09 N 9.25 H 557373.20 6OL4455.30 HS 2.50 88.46 N L2.76 H 557376.53 60L4479.68 HS 2.50 1L6.98 N t6.87 ~ 557180.42 60L4508.23 HS 2.50 L49.61 N 23,58 ~ 557184.88 60L4540.89 HS 2.50 "O I:> U-") ITl (Anadrill {c) 97 MP~13P03 3,0C 9:45 AM P) hO t~vG - L3 (I~0~) $TATIO~ 2 DBNT~FICATION I~ND 2.5/L00 BUrLD SRO 3.5/100 DROP 3/100 f4HASURHD DH ~H LS00.O0 1600.00 1700.00 1800.00 1818.00 ~047.85 1878.00 1900.00 2000.00 2100.00 2200.00 2300.00 2400.00 2500.00 2600.00 2700.D0 2800.00 2900.00 3000.00 3100.00 3~66.L3 5301.45 5400.00 5500.00 5600.00 £NCLN DERECT[ON V~RTECAL-DHPTRS Ah~LH AZIMUTH TVD SUB-SEA SECTION DHPART 23.00 B.21 L475.33 1416.23 25.50 8.21 L566.50 ~507.40 28.00 8.21 £655.79 1596.69 30.50 0,2L 3743.03 1683.93 30.95 8.2L ~758,$0 1699.40 229-28 2q4.28 323.14 332-34 30.95 8.2L ~784.L0 1725.00 30.95 8.2L 3809.96 1750.86 31.72 8.2L 1828.75 1769.65 3~.22 8.2[ 1912./6 1853.06 38.72 8.2~ 1992,04 1932.94 347.69 363.~9 374.64 429.78 489.91 42.22 8-21 2068.L0 2009,00 45.72 8.21 2140.06 2080.96 69.22 8.21 220~.65 2L48.55 52-72 8.21 2270.53 22L~.5~ 56.22 8.21 2328-?1 2269.61 554.80 624.22 697.90 975.57 856.94 59.72 8.21 238L.74 2322.64 63.22 8.21 2429-50 2370.40 66.72 8.21 247[.80 24L2.70 70.22 8.21 2508-49 2449.39 73.72 8.2~ 2539.44 2480.34 941.70 1029.54 1120.~4 1213.~5 1308.22 76-03 6.21 2556.69 2497.59 76.03 8.21 3072.02 30~2.92 73.08 8.21 3098.26 3039,16 70.08 8.2~ 3L29.86 3090.76 67.08 8.21 3L66.38 3107.28 1372.06 3%44.26 3539.24 3634-/[ 3727-L9 5700.00 5800.00 5900.00 64.08 8.21 3207.72 3/48.62 61.08 8.21 3253.77 3[94 .67 58 .08 8.21 33 04 .~0 3245.30 38L8.23 3906.98 3993.2L 09 Jun 1997 Page 2 OOORDINATHS-FRO~ ALASKA Zone 4 TO0h DL/ H~LI/q~AD X Y FAC~ lO0 186.28 ~ 26.87 B 557189,89 601457?.60 HS 2.50 226.93 N 32.73 H 557195.44 60146L8.29 HS 2,50 271.47 N 39.16 ~ 557201.52 6014662.88 HS 2.~0 319.83 N 46.14 ~ 557208.L3 6014711.28 HS 2.50 328.93 N 47.45 E 557209.3~ 60~4720.39 HS 2-50 344.]2 N 49,64 E 5572LL.44 60L4735.60 I--h..q 0.00 359.47 N 51.85 E 5572L3.54 60L4750.97 HS 0.00 370.80 N 53.49 E 5572L5.09 6014762.30 }IS 3.50 425.37 N 61.36 E 557222.54 601~816.93 HB 3.50 484.89 N 69.94 ~ 557230.67 60]4876.50 HS 3.50 549.12 N 79.2~ B 567239.44 6014940.80 HS 3.50 6L7.82 N 89.L2 B 557248.82 6015009.57 HS 3,50 690.75 N 99.64 H 557258.78 6015082.57 HS 3.50 767.62 N 110.73 ~ 557269,28 6015L59.52 RS 3,~0 848.16 N ~22.35 a 557280.28 601~240.[3 HS 3.~0 932.05 N 134.45 H 557291.73 6015324.L1 HS 3.50 L019.O0 N 346.99 ~ 557303.6/ 6015411.14 HS 3.$0 1108,66 N 1~9.92 H 557315.85 6015500.89 HS 3.50 L200.72 N 173.20 H 557328.42 6015593.04 HS 3.50 L294.82 N 186.78 H 55734L.27 6015687-23 HS 3.50 1358.00 N 195.89 B 557349.90 60L5750.47 HS 3.50 3408.98 N 49L.74 B 557629.98 60L7803.46 LS 0.00 3502.98 N 505.30 H 557642.82 60L7893.56 LS 3.00 3596.88 N 518.85 H 557655.64 60L799L.55 LS 3.00 3689.0£ N 532.14 ~ 557668.23 60L8083.76 LS 3_00 3779,LL N 545.14 B 557680.53 60L8173.96 LS 3.00 3866.96 N 557.8L H 557692.53 60L826L.89 l~S 3,00 3952.30 N 570.12 ~ 557704.18 60~83~7.31 LS 3,00 (AnacLvL1L (c) 97 MPG13P03 3.0C 9:45 AM P) ~ I DI~}~T[ FI CAT ~01~ · OP U~R~U TOP M SAND PROPOSED WRLL PROI; ][ I.~ MIgASLrRED INCLN D]RSCTION D~PTR ANGLH AZ£R1/TH 6000.00 55.08 8.21 6/00.00 52.08 8.2~ 6200.00 49.08 8.21 6294.68 46.24 8.21 6300.00 46.08 8.21 6400.00 43-08 6.21 6500.00 40.08 8.21 6600.00 37.08 8.21 6639.96 35.88 8.21 6700.00 34.08 8.21 6800.00 31-08 8.22 E2{D 3/200 DROP 6935.94 30.00 8.21 TARGET 6935.94 30.00 8.22 TOP S(~AD~R / ~ 6935.94 30.00 8.21 NB 6974.04 30.00 8.22 NC/ND 7001.75 30.00 8.2~ NH 7032.93 30.00 8.22 NF 7089.51 30.00 8-23 OA 7227.62 30.00 8-21 QA4 7~66.88 30.00 8-21 VHRTICAL-OHPTHS TVD SUB-SEA 3359.67 3300.37 34~8,84 3359.74 3482.33 3423.23 3546.~0 3487.00 3549.78 3490.68 OB 7208,44 30.00 0.2~ BASE SCHRADER 7240,78 30.00 8.21 7" CASING POINT 7440,78 30.00 8.21 T~ 7440.78 30.00 8.21 09 JUn [997 Page 3 SECTION COORDINATES-FRCX4 DSPART WELLJ~EAD 4076.66 4034.90 N 582,03 ~[57.12 4114.~3 ~ 593,52 4234.36 4190.98 ~ 604.55 4304,33 4260,24 ~ 614.54 4300.[7 4264.03 ~ ALASKA Zone 4 X ¥ 557715.46 6018429.99 5577~6.34 60185~9.71 557736.78 6018586.23 557746.23 6018655.56 615.08 ~ 557746.75 60186~9.36 3621.00 3561.90 4378.35 4333.50 N 625.[0 3695-80 3636.70 4444.71 4399.[7 N 634.58 3773.97 3714.87 4507.06 4460.88 N 643.48 3006.~0 3747.00 4530.8£ 4484.40 N 646.87 3855-29 3796.19 4565.~3 45L8.46 N 65~.79 (Anadriil (c)97 MPG23P03 3,0C 9:~5 AM P) 3939.55 3880.45 4619,07 457L.75 N 659.47 3970.50 391£.40 4637.33 4589.82 N 662.08 4057.20 3998.00 4687.33 4639.31 N 669.22 4057.10 3998.00 4687.33 4639.31 ~ 669.22 4090.~0 4031.00 {706.38 4658.17 N 67~.94 ~/I14 . :10 4055.00 4141.20 4082.00 4L90.20 4131 .00 4223 .]0 4164.00 4257.20 4196{ .00 4720.24 4735.83 4764.1] 4783.17 4802.80 4823.58 4839.75 4939.75 4939.75 4293.10 4234,00 4321.10 4262.00 4494.3~ 4435.21 4494.3~ 4435.2~ PACH LO0 LS 3.00 ~S 3.00 LS 3.00 LS 3-00 LS 3.00 557756.24 6018728.89 LS 3.00 557765.21 6018794.63 LS 3.00 557773.63 6018856.40 LS 3.00 557776.85 6018879.94 LS 3,00 557781.50 60189~4.03 LS 3.00 557788.77 6018967.3? LS 3.00 557791.24 6018985.46 HS 3.00 557798.00 60[9035.00 ~S 0.00 557798.00 60L9035.00 HS 0.00 557800.58 60L9053.88 HS 0.00 4672.88 4687.31 47~5.31 4734.17 4753.60 673.92 B 557802.45 6019067.60 HS 0.00 676.14 E 557804.55 60~9083.05 HS 0.00 680.18 E 557808.38 60~9111.08 HS 0.00 682.90 g 557810.95 6019129.95 [-iS 0.00 685.70 E 557013.61 6019149.40 RS 0.00 4774.17 4790.17 4889.14 4889.14 688.67 g 557036.42 6019169.99 }IS 0.00 690.96 g 557828.60 6019L86.01 HS 0.00 705.26 ~ 557832.12 6019285.08 O,O0 705.26 B 557832.12 6019285.08 0.00 ANADRILL AKA-DPC APPROVED FOR PERMITTING PLAN Z SHA ED SERVTCES · iii D ILLI G' Anadr Y ]] Schlumberger MPG- 13 (PO3) VERTICAL SECTION VIEW I __ A i ANADRIL. L. ' ........ AKA~DPC JSection at: 8,2~ · A, PPRC}VED ITVD scale.: '1 inch: 800 feet IDep Scalei: '[ inch = BO0 feet .___, i:OR )ERNtlTT NG ~o., 1§97 ~'- PLA~ :~ ~ -- 0 .... Marker Identification MD BKB SECTN INCLI I ......... ~v ....... J A) KB 0 0 0 O.OI B) I(QP/BIJILD I/lO0 400 400 0 0,0( __ C) BUILD 1,7§/)OO 600 600 3 2,01 ~~= O) BUILD 2.5/100 BOO BOO 17 E) END 2.5/~00 BUILO IB18 17§9 332 30. F) BDILD 3.5/100 I970 IBIO 363 30.9! -- . ....... G] END 3,5/)00 BUILD 3166 2557 ~372 ?6.0: I(J DRDP 3/100 §301 3072 3444 76.0'. ' ll~!k;~'bi~l~-~)1 IJ END 3/100 ~OP 683§ 3970 4637 30,0~ F ~, JI TA~ET 6936 4057 4687 30,0~ --~ K) 7" CASING P§INT 744! 4494 4940 L) TD 7441 4494 4940 30,0  ....... --::::_- .-. :::::_-::=:: ~ ..... , ~_-_--. ,, o 400 8oo ]2oo 1§oo 2000 2400 2800 3200 3600 ,~ooo 4400 4o00 520o 5§00 6000 6400 Section Departure Ana~[]] (c197 ~GI3P03 3,0C 9:46 All 6800 06/09/1997 11:17 907-344-2160 A~ADRILL DPC NPG- ] 3 (PO3) VERTICAL SECTION VIEW Section at: 6].2] TVD Scale.: ~ inch : ]00 feet Oep ScaJe.: ~ inch- ~00 feet Draun ..... : 09 dun J997 ,4nad£j ]] Sch]u~Derge£ Marl<er Identification ~0 BK~ SECTN INCLN A] END 3/]00 DROP 6B36 ~gTO 4637 30,00 B) T~RGET 6936 4057 4687 30.00 C) 7' CASING POINT 744~ 4494 4940 30,00 D) TD 7441 4494 4940 30.00 4400 4450 4500 4550 4600 4650 4700 4750 4800 4850 4900 .4950 §000 5050 5100 Section Departure (~nadr111 (c)97 NPS: 3.0C 9:~9 A~ P! Marker Ident i ficat ion HO N/S E/W ~ ~o~/~U~LO ~/~oo ~oo o ~ CI BUILD 1.75/100 800 3 N 0 E) END 2.5/100 BUILD 1838 329 N 47 E ~) ~U~LO 3.~/~oo ~a 3~ N ~ E G) END 3.5/~00 BUILD 3'66 ~358 N 196 H) DROP 3/t00 5301 3408 N 492 E I) END 3/t00 DROP 6836 45~0 N 662 E J) TARGET 6936 4639 N 669 E K) 7' CASZNG POINT 744~ 4889 N 705 L) TD 7441 4BBB N 705 E MPG-13 (1:03) PLAN VIEW CLOSURE ..... : 4940 feet at Azimuth DECLINATION.: +28.045 (E) SCALE .......: ! inch = 800 feet DRAWN .......; 09 dun 1997 Anadpi ]] $ch]umDepger 8.2~ , I ANAl I~ILL "AKA-D =C A)PRCVED I - ~ .,, ...... .... RECEIV] D J U N 1 5 19~ 7 ,, 400 0 400 800 ~200 ~600 2000 2400 2800 3200 3600 4000 4~00 aBO0 5200 <- WEST ' EAST -> Omad~il] 1c197 ~G{3P03 3.0C 9:49 AH M WELL PERMIT CHECKLISToo Y /-- ~SF;/ GEOL AREA PROGRAM: exprl dev~redrlr] servn wellbore segr] ann disp para~req[q ADMI N I STRAT I ON 1. Permit fee attached .................. N 2. Lease number appropriate ............... N 3. Unique well name and number .............. N 4. Well located in a defined pool ............. N 5. Well located proper distance from drlg unit boundary. . N 6. Well located proper distance from other wells ..... N 7. Sufficient acreage available in drilling unit ..... N 8. If deviated, is wellbore plat included ........ N 9. Operator only affected party .............. N 10. Operator has appropriate bond in force ......... N 11. Permit can be issued without conservation order .... N 12. Permit can be issued without administrative approval. . N 13. Can permit be approved before 15-day wait ....... N ENGINEERING 14. Conductor string provided ............... ~ N 15. Surface casing protects all known USDWs ........ ~ N 16. CMT vol adequate to circulate on conductor & surf csg. i~i ~___ ~~_~ 17. CMT vol adequate to tie-in long string to surf csg . . 18. CMT will cover all known productive horizons ...... 19. Casing designs adequate for C, T, B & permafrost .... 20. Adequate tankage or reserve pit ............. N 21. If a re-drill, has a 10-403 for abndnmnt been approved. ~__..~_~'~1 22. Adequate wellbore separation proposed .......... N~7~ 23. If diverter required, is it adequate .......... N 24. Drilling fluid program schematic & equip list adequate . N 25. BOPEs adequate ..................... N 26. BOPE press rating adequate; test to ~-~ psig. N 27. Choke manifold complies w/API RP-53 (May 84) ...... N 28. Work will occur without operation shutdown ....... 29. Is presence of H2S gas probable ............. Y GEOLOGY ? 30. Permit can be issued w/o hydrogen sulfide measures .... Y 31. Data presented on potential overpressure zones ..... Y~ 32. Seismic analysis of shallow gas zones .......... 33. Seabed condition survey (if off-shore) ........ /Y N ' 34. Contact name/phone for weekly progress reports . . y . Y N [exploratory only] REMARKS GEOLOGy: ENGINEERING: COMMISSION: Comments/Instructions: HOW/dlf- A:\FORMS\cheklist rev 01/97 Well HistorY File APPENDIX Information of detailed nature that is not particularly germane to the Well Permitting Process but is part of the history file. To improve the readability of the Well History file and to simplify finding information, information of this nature is accumulated at the end of the file under APPENDIX. No special effort has been made to chronologically organize this category of information. Sperry-Sun Drilling Services LIS Scan Utility Mon Nov 16 15:26:21 1998 Reel Header Service name ............. LISTPE Date ..................... 98/11/16 Origin ................... STS Reel Name ................ UNKNOWN Continuation Number ...... 01 Previous Reel Name ....... UNKNOWN Comments ................. STS LIS Writing Library. Services Scientific Technical Tape Header Service name ............. LISTPE Date ..................... 98/11/16 Origin ................... STS Tape Name ................ UNKNOWN Continuation Number ...... 01 Previous Tape Name ....... UNKNOWN Comments ................. STS LIS Writing Library. Services Physical EOF Comment Record TAPE HEADER MILNE POINT UNIT MWD/MAD LOGS WELL NAME: API NUMBER: OPERATOR: LOGGING COMPANY: TAPE CREATION DATE: JOB DATA JOB NLTMBER: LOGGING ENGINEER: OPERATOR WITNESS: SURFACE LOCATION SECTION: TOWNSHIP: RANGE: FNL: FSL: FEL: FWL: ELEVATION (FT FROM MSL 0) KELLY BUSHING: MWD RUN 2 AK-MM-70204 PIEPER ANGLEN Scientific Technical REPRoCESSED TI,IlS !!~I~PLAC~ ~LL R~EVIOU§ DATA ,. I i i MPG-13 (DEPTH CORREC 500292278200 BP EXPLORATION (ALASKA), INC. SPERRY-SUN DRILLING SERVICES 16-NOV-98 27 13N 10E 1956 3439 NOV 1 8 1998 Anchorage .00 DERRICK FLOOR: GROUND LEVEL: WELL CASING RECORD 1ST STRING 2ND STRING 3RD STRING PRODUCTION STRING REMARKS: 58.60 29.60 OPEN HOLE CASING DRILLERS BIT SIZE (IN) SIZE (IN) DEPTH (FT) 20.000 112.0 8.500 7417.0 1. ALL DEPTHS ARE MEASURED DEPTHS (MD) UNLESS OTHERWISE NOTED. 2. ALL MWD DEPTHS ARE CORRECTED/SHIFTED TO THE SCHLUMBERGER GR WHICH WAS LOGGED ON 03 JUNE, 1998. THE SURVEY PROVIDED WITH THIS LOG IS NOT DEPTH CORRECTED AND IT IS NOT THE FINAL OR OFFICIAL SURVEY. HOWEVER, THE PROJECTED FINAL SURVEY POINT HAS BEEN SHIFTED. 3. MWD RUN 1 IS DIRECTIONAL ONLY AND IS NOT PRESENTED. 4. MWD RUN 2 IS DIRECTIONAL WITH DUAL GAMMA RAY (DGR) UTILIZING GEIGER- MUELLER TUBE DETECTORS, AlkrD ELECTROMAGNETIC WAVE RESISTIVITY PHASE-4 (EWR4) 5. THIS WELL HAS BEEN REPROCESSED DUE TO A CHANGE OF DEPTH SHIFTING/CORRECTION REQUIREMENTS AS PER THE E-MAIL MESSAGE FROM KATIE NITZBERG OF BP EXPLORATION (ALASKA), INC. ON 29 OCTOBER, 1998. THIS DATA SHOULD REPLACE ALL PREVIOUS DATA PROVIDED BY SPERRY-SUN DRILLING SERVICES. 6. THIS WELL REACHED A TOTAL DEPTH (TD) OF 7417'MD, 4493'TVD. SROP = SMOOTHED RATE OF PENETRATION WHILE DRILLING. SGRC = SMOOTHED GAMMA R_AY COMBINED. SEXP = SMOOTHED PHASE SHIFT-DERIVED RESISTIVITY (EXTRA-SHALLOW SPACING). SESP = SMOOTHED PHASE SHIFT-DERIVED RESISTIVITY (SHALLOW SPACING). SEMP = SMOOTHED PHASE SHIFT-DERIVED RESISTIVITY (MEDIUM SPACING). SEDP = SMOOTHED PHASE SHIFT-DERIVED RESISTIVITY (DEEP SPACING). SFXE = SMOOTHED FORMATION EXPOSURE TIME FOR RESISTIVITY SENSOR. ALL CURVES WITH THE EXTENTION "S" ARE DEPTH SHIFTED/CORRECTED TO WIRE-LINE GR. $ File Header Service name ............. STSLIB.001 Service Sub Level Name... Version Number ........... 1.0.0 Date of Generation ....... 98/11/16 Maximum Physical Record..65535 File Type ................ LO Previous File Name ....... STSLIB.000 Comment Record FILE HEADER FILE NUMBER: 1 EDITED MERGED MWD Depth shifted and clipped curves; all bit runs merged. DEPTH INCREMENT: .5000 FILE SUMMARY PBU TOOL CODE START DEPTH STOP DEPTH FET 4466 0 7359 5 RPD 4466 0 7359 5 RPM 4466 0 7359 5 RPS 4466 0 7359 5 RPX 4466 0 7359 5 GR 4472 5 7367 0 ROP 4523 0 7417 0 $ BASELINE CURVE FOR SHIFTS: CURVE SHIFT DATA (MEASURED DEPTH) BASELINE DEPTH 4472 5 4967 4975 4981 4987 5002 5005 5034 5036 5038.0 5039.5 5046.5 5090.0 5097.0 5099.0 5122.0 5131 5 5135 5 5139 5 5197 5 5201 5 5222 0 5227 0 5232 5 5274 5 5278 0 5319 5 5462 0 5468 0 5476 0 5484 0 5489 0 GR 4482 0 4977 0 4982 5 4988 5 4993 5 5010 0 5016 0 5039 0 5040 0 5041.5 5043.0 5051.0 5099.5 5104.0 5105.0 5133.0 5138.0 5143.5 5147.5 5201 0 5202 0 5229 5 5232 0 5239 5 5281 0 5284 5 5323 0 5470 0 5477 0 5485 0 5494 0 5498 0 EQUIVALENT UNSHIFTED DEPTH -- 5518.0 5520.5 5540.0 5547.0 5550.0 5586.0 5601.0 5606 0 5607 5 5610 5 5614 5 5615 0 5626 0 5632 5 5638 5 5643 0 5646 0 5664 0 5669 5 5678 5 5685 0 5689 5 5703 5 5710 0 5724 5 5732 0 5735 5 5739 5 5749 0 5757 5 5760 5 5765 5 5986 0 5990 0 5994 0 6008 5 6014 0 6021 0 6058 5 6065 0 6070 0 6101 5 6105 0 6108 5 6111 0 6116 5 6120 5 6131 0 6134 0 6144.5 6153.5 6157.5 6187.0 6192 . 5 6199.0 6207.5 6213.5 5526.0 5529.5 5551.0 5554 5 5557 0 5592 0 5608 0 5612 5 5615 5 5618 0 5620 5 5621 0 5635 0 5638 0 5645 0 5650 0 5651 5 5671 5 5677 5 5685 0 5690 5 5697 0 5711 5 5716 0 5731 5 5737 5 5742 0 5747 0 5756 5 5766 5 5770 5 5774 5 5994 5 5999 0 6002 0 6017 0 6021 0 6029 0 6071 5 6075 0 6079.5 6110.5 6113.0 6115.0 6120.0 6124.5 6130.5 6138.5 6140 5 6152 0 6161 5 6165 0 6195 0 6199 0 6208 5 6215 5 6222 5 6218 6222 6226 6228 6244 6247 6252 6257 6264 6272 6279 6284 6293 6297 6303 6307 6310 6326 6331 6335 6343 6354 6364 6372 6374 6380 6384 6401 6413 6435 6465 6481 6499 6500 6502 6504 6506 6519 6531 6535 6539 6544 6548 6575 6593 6598 6604 6610 6618 6625 6629 6635 6638 6641 6659 6663 6666 6225 0 6230 5 6235 0 6238 0 6251 5 6255 5 6261 5 6265 5 6273 0 6279 0 6286 5 6291 5 6297 5 6300 0 6305 5 6310 5 6316 5 6332 5 6338 0 6340 0 6349 5 6362 5 6369 0 6377 5 6381 0 6386 5 6391 0 6406 5 6418 5 6443 5 6472 5 6488 0 6504 5 6507.0 6508.0 6510.0 6511.5 6524.0 6536.5 6539.0 6545 5 6550 0 6553 0 6579 5 6598 5 6602 0 6606 5 6614 0 6623 0 6629.5 6633 0 6639 0 6642 5 6647 0 6665 5 6668 0 6669 5 6669 6671 6673 6675 6678 6683 6687 6689 6691 6695 6697 6701 6704 6711 6715 6716 6719 6721 6726 6792 6795 6798 6803 6805 6807 6809 6810 6812 6816 6825 6829 6836 6838 6841 6866 6873 6878 6885 6891 6894 6924 6929 6933 6954 6957 6963 6969 6978 6988 7015 7031 7043 7055 7058 7076 7078 7083 5 5 0 5 0 0 0 5 5 5 5 5 0 5 0 5 0 .5 0 0 5 0 0 5 0 0 0 0 0 5 .0 5 5 5 0 5 5 5 .0 5 5 0 0 0 0 0 5 5 5 .5 0 5 5 5 5 5 5 6675 6676 6677 6680 6683 6688 6693 6694 6696 6699 6701 6704 6709 6715 6718 6720 6723 6726 6732 6795 6799 6802 6806 6808 6812 6813 6815 6817 6822 6830 6835 6839 6842 6845 6870 6876 6881 6887 6895 6895 6928 6932 6936 6957 6961 6968 6978 6983 6992 7021 7037. 7050. 7059. 7061. 7079. 7081. 7089. 7092 7096 7116 7120 7124 7130 7135 7139 7141 7150 7152 7165 7167 7176 7188. 7196. 7209. 7218. 7417. $ MERGED DATA SOURCE PBU TOOL CODE MWD $ REMARKS: 7098 0 7100 5 7120 0 7125 0 7128 0 7132 5 7139 5 7143 5 7146 0 7158 0 7159 0 7168 0 7169 5 7180 5 7192 5 7198 0 7210 0 7222.0 7421.0 BIT RUN NO MERGE TOP MERGE BASE 2 4523.0 7417.0 MERGED MAIN PASS. $ Data Format Specification Record Data Record Type .................. 0 Data Specification Block Type ..... 0 Logging Direction ................. Down Optical log depth units ........... Feet Data Reference Point .............. Undefined Frame Spacing ..................... 60 .liN Max frames per record ............. Undefined Absent value ...................... -999.25 Depth Units ....................... Datum Specification Block sub-type...0 Name Service Order Units DEPT FT 4 1 68 ROP MWD FT/H 4 1 68 GR MWD AAPI 4 1 68 RPX MWD OHMM 4 1 68 RPS MWD OHMM 4 1 68 RPM MWD OHMM 4 1 68 RPD MWD OHMM 4 1 68 FET MWD HOUR 4 1 68 Size Nsam Rep Code Offset Channel 0 1 4 2 8 3 12 4 16 5 20 6 24 7 28 8 Name Min Max Mean DEPT 4466 7417 5941.5 R0P 15.6916 912.305 229.239 Nsam 5903 5789 First Reading 4466 4523 Last Reading 7417 7417 GR 15.5736 112.252 60.729 RPX 0.9615 80.6947 7.19094 RPS 0.9735 67.6329 7.49954 RPM 0.9607 63.7239 7.27664 RPD 0.9397 56.3699 7.51424 FET 0.1222 10.7901 0.868517 5790 5788 5788 5788 5788 5788 4472.5 4466 4466 4466 4466 4466 7367 7359.5 7359.5 7359.5 7359.5 7359.5 First Reading For Entire File .......... 4466 Last Reading For Entire File ........... 7417 File Trailer Service name ............. STSLIB.001 Service Sub Level Name... Version Number ........... 1.0.0 Date of Generation ....... 98/11/16 Maximum Physical Record..65535 File Type ................ LO Next File Name ........... STSLIB.002 Physical EOF File Header Service name ............. STSLIB.002 Service Sub Level Name... Version Number ........... 1.0.0 Date of Generation ....... 98/11/16 Maximum Physical Record.,65535 File Type ................ LO Previous File Name ....... STSLIB.001 Comment Record FILE HEADER FILE NUMBER: 2 R3kW MWD Curves and loH header data for each bit run in separate files. BIT RUN NUMBER: 2 DEPTH INCREMENT: .5000 FILE SUMMARY VENDOR TOOL CODE START DEPTH STOP DEPTH FET 4475 0 7363 5 RPD 4475 0 7363 5 RPM 4475 0 7363 5 RPS 4475 0 7363 5 RPX 4475 0 7363 5 GR 4482 0 7371 0 ROP 4532 5 7421 0 $ LOG HEADER DATA DATE LOGGED: 17-J/3L-97 SOFTWARE SURFACE SOFTWARE VERSION: 5.06 DOWNHOLE SOFTWARE VERSION: DATA TYPE (MEMORY OR REAL-TIME): TD DRILLER (FT) : TOP LOG INTERVAL (FT) : BOTTOM LOG INTERVAL (FT) : BIT ROTATING SPEED (RPM) : HOLE INCLINATION (DEG MINIMUM ANGLE: MAXIMUM ANGLE: TOOL STRING (TOP TO BOTTOM) VENDOR TOOL CODE TOOL TYPE DGR DUAL GAMMA RAY EWR4 ELECTROMAG. RESIS. 4 $ BOREHOLE AATD CASING DATA OPEN HOLE BIT SIZE (IN): DRILLER' S CASING DEPTH (FT) : BOREHOLE CONDITIONS MUD TYPE: MUD DENSITY (LB/G): MUD VISCOSITY (S) : MUD PH: MUD CHLORIDES (PPM) : FLUID LOSS (C3) : RESISTIVITY (OHMM) AT TEMPEP~ATURE (DEGF) MUD AT MEASURED TEMPERATURE (MT): MUD AT MAX CIRCULATING TERMPERATURE: MUD FILTRATE AT MT: MUD CAKE AT MT: NEUTRON TOOL MATRIX: MATRIX DENSITY: HOLE CORRECTION (IN) : TOOL STANDOFF (IN) : EWR FREQUENCY (HZ) : REMARKS: $ Data Format Specification Record Data Record Type .................. 0 Data Specification Block Type ..... 0 Logging Direction ................. Down Optical log depth units ........... Feet Data Reference Point .............. Undefined Frame Spacing ..................... 60 .liN Max frames per record ............. Undefined Absent value ...................... -999.25 Depth Units ....................... Datum Specification Block sub-type...0 5.46 MEMORY 7417.0 4523.0 7417.0 37.4 75.6 TOOL NUMBER P0771CRG6 P0771CRG6 8.500 8.5 SPUD 9.00 70.0 9.0 800 5.2 3.600 2.600 3.500 3,800 31.7 Name Service Order Units Size Nsam Rep Code Offset Channel DEPT FT 4 1 68 GR MWD 2 AAPI 4 1 68 RPX MWD 2 OHMM 4 1 68 RPS MWD 2 OHMM 4 1 68 RPM MWD 2 OHMM 4 1 68 RPD MWD 2 OHMM 4 1 68 R0P MWD 2 FT/H 4 1 68 FET MWD 2 HOUR 4 1 68 0 1 4 2 8 3 12 4 16 5 20 6 24 7 28 8 Name Min Max Mean DEPT 4475 7421 5948 GR 15.574 112.252 60.7295 RPX 0.961 80.695 7.19529 RPS 0.974 67.633 7.49948 RPM 0.961 63.724 7.27385 RPD 0.94 56.37 7.50721 ROP 14.116 912.305 229.018 FET 0.122 10.79 0.86666 First Last Nsam Reading Reading 5893 4475 7421 5779 4482 7371 5778 4475 7363.5 5778 4475 7363.5 5778 4475 7363.5 5778 4475 7363.5 5778 4532.5 7421 5778 4475 7363.5 First Reading For Entire File .......... 4475 Last Reading For Entire File ........... 7421 File Trailer Service name ............. STSLIB.002 Service Sub Level Name... Version Number ........... 1.0.0 Date of Generation ....... 98/11/16 Maximum Physical Record..65535 File Type ................ LO Next File Name ........... STSLIB.003 Physical EOF Tape Trailer Service name ............. LISTPE Date ..................... 98/11/16 Origin ................... STS Tape Name ................ UNKNOWN Continuation Number ...... 01 Next Tape Name ........... UNKNOWN Comments ................. STS LIS Writing Library. Services Reel Trailer Service name ............. LISTPE Date ..................... 98/11/16 Origin ................... STS Reel Name ................ UNKNOWN Continuation Number ...... 01 Next Reel Name ........... UNKNOWN Scientific Technical Comments ................. STS LIS Writing Library. Scientific Technical Services Physical EOF Physical EOF End Of LIS File * ALASKA COMPUTING CENTER * * ..... WESTERN ATLAS LOG .... * * ....... PROCESSED BY ....... * ....... SCHLUMBERGER ....... COMPANY NAME : BP EXPLORATION (ALASKA) WELL NAME : MPG-13 FIELD NAME : MILNE POINT BOROUGH '. NORTH SLOPE STATE : ALASKA API NUMBER : 500292278200 REFERENCE NO : 98396 RECEIVED AUG ?-0 1998 oit & Gas cons. com~'~issio~ LIS Tape Verification Listing Schlumberger Alaska Computing Center 4-AUG-1998 10:57 PAGE: **** REEL HEADER **** SERVICE NA~E : EDIT DATE : 98/08/ 4 ORIGIN : FLIC REEL NAME : 98396 CONTINUATION # : PREVIOUS REEL : COf~V~_2TT : BP EXPLORATION, MPG-13, MILNE POINT, API# 50-029-22782-00 **** TAPE HEADER **** SERVICE NAM~ : EDIT DATE : 98/08/ 4 ORIGIN : FLIC TAPE NA~IE : 98396 CONTINUATION # : 1 PREVIOUS TAPE : COf4~HANT : BP EXPLORATION, MPG-13, MILNE POINT, API# 50-029-22782-00 TAPE HEADER MILNE POINT CASED HOLE WIRELINE LOGS WELL NAME: MPG-13 API ~ER: 500292278200 OPERATOR: BP EXPLORATION (ALASKA) LOGGING COMPANY: WESTERN ATLAS TAPE CREATION DATE: 4-AUG-98 JOB ~ER: 98396 LOGGING ENGINEER: RECK OPERATOR WITNESS: L HINKEL SURFACE LOCATION SECTION: 27 TOWNSHIP: 13N RANGE: 10E FNL: FSL: 1956 FEL: 3439 FWL: ELEVATION (FT FROM MSL O) KELLY BUSHING: DERRICK FLOOR: 58.60 GROUND LEVEL: 29.60 WELL CASING RECORD OPEN HOLE CASING DRILLERS CASING BIT SIZE (IN) SIZE (IN) DEPTH (FT) WEIGHT (LB/FT) 1ST STRING 7. 000 7404.0 26. O0 2ND STRING 3RD STRING PRODUCTION STRING CURVE SHIFT DATA - ALL PASSES TO STANDARD (MEASURED DEPTH) LIS Tape Verification Listing Schlumberger Alaska Computing Center 4-AUG-1998 10:57 BASELINE CURVE FOR SHIFTS LDWG TOOL CODE: LDWG CURVE CODE: RUN NUFiBER : PASS NUMBER: DATE LOGGED: LOGGING COMPANY: .......... EQUIVALENT UNSHIFTEDDEPTH .......... BASELINE DEPTH $ THIS FILE CONTAINS THE CASED HOLE GENERAL CURVES FROM THE SBT LOG WESTERN ATLAS RAN ON BP EXPLORATION'S MPG-13 WELL. THIS LOG IS THE PDC. $ PAGE: **** FILE HEADER **** FILE NAME : EDIT .001 SERVICE : FLIC VERSION : 00lCO1 DATE : 98/08/ 4 MAX REC SIZE : 1024 FILE TYPE : LO LAST FILE : FILE HEADER FILE NUMBER: 1 EDITED CURVES Depth shifted and clipped curves for each pass in separate files. PASS ~ER : 1 DEPTH INCRE~iENT: 0.5000 FILE SUMMARY LDWG TOOL CODE START DEPTH STOP DEPTH CET 7248.0 4966.0 $ CURVE SHIFT DATA - PASS TO PASS (MEASURED DEPTH) BASELINE CURVE FOR SHIFTS LDWG CURVE CODE: PASS NUMBER: BASELINE DEPTH $ .......... EQUIVALENT UNSHIFTEDDEPTH .......... CET ....... REMARKS: THIS FILE CONTAINS THE CLIPPED MAIN PASS DATA. $ LIS Tape Verification Listing Schlumberger Alaska Computing Center 4-AUG-1998 10:57 PAGE: 3 LIS FORMAT DATA ** DATA FORMAT SPECIFICATION RECORD ** ** SET TYPE - 64EB ** .............................. TYPE REPR CODE VALUE 1 66 0 2 66 0 3 73 24 4 66 1 5 66 6 73 7 65 8 68 0.5 9 65 FT 11 66 42 12 68 13 66 0 14 65 FT 15 66 68 16 66 1 0 66 0 ** SET TYPE - CHAN ** NAME SERV UNIT SERVICE API API API API FILE NUMB NUMB SIZE REPR PROCESS ID ORDER # LOG TYPE CLASS MOD NUMB SAMP ELEM CODE (HEX) DEPT FT 194620 O0 000 O0 0 1 1 1 4 GRCH CET GAPI 194620 O0 000 O0 0 1 1 1 4 CCL CET V 194620 O0 000 O0 0 1 1 1 4 TENS CET LB 194620 O0 000 O0 0 1 1 1 4 RB1 CET DEG 194620 O0 000 O0 0 1 1 1 4 DEV CET DEG 194620 O0 000 O0 0 1 1 1 4 68 0000000000 68 0000000000 68 0000000000 68 0000000000 68 0000000000 68 0000000000 ** DATA ** DEPT. 7248.000 GRCH. CET 61.820 CCL.CET RBi. CET 68.782 DEV. CET 44.342 DEPT. 4966.000 GRCH. CET 57.706 CCL.CET RBi. CET 0.000 DEV. CET 0.000 50.000 TENS.CET 11.000 TENS.CET 2350.668 3000.000 ** END OF DATA ** LIS Tape Verification Listing Schlumberger Alaska Computing Center 4-AUG-1998 10:57 PAGE: **** FILE TRAILER **** FILE NA~E : EDIT .001 SERVICE : FLIC VERSION · O01CO1 DATE : 98/08/ 4 MAX REC SIZE : 1024 FILE TYPE : LO LAST FILE **** FILE HEADER **** FILE NAM~ : EDIT .002 SERVICE : FLIC VERSION : O01CO1 DATE : 98/08/ 4 MAX REC SIZE : 1024 FILE TYPE : LO LAST FILE : FILE HEADER FILE NUAIBER: 2 EDITED CURVES Depth shifted and clipped curves for each pass in separate files. PASS NUMBER: 2 DEPTH INCREMEIVT: 0.5000 FILE SU~E~ARY LDWG TOOL CODE START DEPTH STOP DEPTH CET 7248.0 7004.5 $ CURVE SHIFT DATA - PASS TO PASS (FiEASURED DEPTH) BASELINE CURVE FOR SHIFTS LDWG CURVE CODE: PASS NUFIBER: BASELINE DEPTH $ .......... EQUIVALENT UNSHIFTEDDEPTH .......... CET ....... REMARKS: THIS FILE CONTAINS THE EDITED REPEAT PASS DATA. $ LIS FORMAT DATA LIS Tape Verification Listing Schlumberger Alaska Computing Center 4-AUG-1998 10:57 PAGE: 5 ** DATA FORMAT SPECIFICATION RECORD ** ** SET TYPE - 64EB ** TYPE REPR CODE VALUE .............................. 1 66 0 2 66 0 3 73 24 4 66 1 5 66 6 73 7 65 8 68 0.5 9 65 FT 11 66 42 12 68 13 66 0 14 65 FT 15 66 68 16 66 1 0 66 1 ** SET TYPE - CHAN ** NA~E SERV UNIT SERVICE API API API API FILE NUMB NUMB SIZE REPR PROCESS ID ORDER # LOG TYPE CLASS MOD NUMB SAMP ELEM CODE (HEX) DEPT FT 194620 O0 000 O0 0 2 1 1 4 68 0000000000 GRCH CET GAPI 194620 O0 000 O0 0 2 1 1 4 68 0000000000 CCL CET V 194620 O0 000 O0 0 2 1 1 4 68 0000000000 TENS CET LB 194620 O0 000 O0 0 2 1 1 4 68 0000000000 RB1 CET DEG 194620 O0 000 O0 0 2 1 1 4 68 0000000000 DEV CET DEG 194620 O0 000 O0 0 2 1 1 4 68 0000000000 ** DATA ** DEPT. 7248. 000 GRCH. CET 58. 038 CCL. CET RB1. CET 51. 519 DEV. CET 43.917 DEPT. 7022. 000 GRCH. CET 53. 348 CCL. CET RB1 . CET O. 000 DEV. CET O. 000 50.000 TENS.CET 2345.619 0.000 TENS.CET 3000.000 ** END OF DATA ** LIS Tape Verification Listing Schlumberger Alaska Computing Center 4-AUG-1998 10:57 PAGE: **** FILE TRAILER **** FILE NA~iE : EDIT .002 SERVICE · FLIC VERSION : O01CO1 DATE · 98/08/ 4 MAX REC SIZE : 1024 FILE TYPE : LO LAST FILE : **** FILE HEADER **** FILE NAME : EDIT .003 SERVICE : FLIC VERSION : O01CO1 DATE : 98/08/ 4 MAX REC SIZE : 1024 FILE TYPE : LO LAST FILE : FILE HEADER FILENUM~ER 3 RAW CURVES Curves and log header data for each pass in separate files; raw background pass in last file PASS AU3M~ER: 1 DEPTH INC~: 0.2500 FILE SUF~Uh~Y VENDOR TOOL CODE START DEPTH STOP DEPTH ..................................... 7248.0 4966.0 SBT $ LOG HF_J~ER DATA DATE LOGGED: SOFTWARE VERSION: TIf4~ LOGGER ON BOTTOM: TD DRILLER (FT) : TD LOGGER (FT) : TOP LOG INTERVAL (FT) : BOTTOM LOG INTERVAL (FT) : LOGGING SPEED (FPHR) : DEPTH CONTROL USED (YES/NO) : TOOL STRING (TOP TO BOTTOM) VENDOR TOOL CODE TOOL TYPE GR GAM~A RAY SBT SEGME1TTED BOND $ BOREHOLE AND CASING DATA OPEN HOLE BIT SIZE (IN): 03-JUN-98 JO01 VERi.1 7320.0 4966.0 7248.0 TOOL NUMBER ........... GR 1309XA SBT 1424XA LIS Tape Verification Listing Schlumberger Alaska Computing Center 4-AUG-1998 10:57 PAGE: DRILLERS CASING DEPTH (FT) : LOGGERS CASING DEPTH (FT) : 7404.0 BOREHOLE CONDITIONS FLUID TYPE: FLUID DENSITY (LB/G): SURFACE TEMPERATURE (DEGF) '. BOTTOM HOLE TEMPERATURE (DEGF) : FLUID SALINITY (PPM) : FLUID LEVEL (FT) : FLUID RATE AT WELLHEAD (BPM) : WATER CUTS (PCT) : GAS~OIL RATIO: CHOKE (DEG) : BRINE NEUTRON TOOL TOOL TYPE (EPITHERMAL OR THERMAL): MATRIX: MATRIX DENSITY: HOLE CORRECTION (IN): BLUELINE COUNT RATE NORMALIZATION IN OIL ZONE TOP NORMALIZING WINDOW (FT) : BASE NORMALIZING WINDOW (FT): BLUELINE COUNT RATE SCALES SET BY FIELD ENGINEER FAR COUNT RATE LOW SCALE (CPS): FAR COUNT RATE HIGH SCALE (CPS): NEAR COUNT RATE LOW SCALE (CPS): NEAR COUNT RATE HIGH SCALE (CPS): TOOL STANDOFF (IN): LOG WAS RUN WITHMARKEDLINEFOR PRIMARY DEPTH CONTROL. REFERENCE LOG MWDDATED 16-JUL-97 THROUGH 18-JUL-97. CEMENT COMPRESSIVE STRENGTH = 2000 PSI ASSUMED. CEMENT DATA: MIXED AND PUMPED CEMENT: 359 SX PERMAFROST "E" 12.0 PPG CEMF2VTADDITIVES: 0.3 LB/SX CELLO-FLAKE MIXED AND PUMPED CEMENT: 130 SX PREMIUM "G" 13.1 PPG CEF~F_~VTADDITIVES: 0.15 LB/SX CELLO-FLAKE 0.20~ CFR-3 0.75~ HALAD 344 0.1 LB/SX SUPER CBL 15 LB/SX SILICALITE THIS FILE CONTAINS THE RAW DATA FOR THE MAIN PASS. $ LIS FORMAT DATA LIS Tape Verification Listing Schlumberger Alaska Computing Center 4-AUG-1998 10:57 PAGE: 8 ** DATA FORMAT SPECIFICATION RECORD ** ** SET TYPE - 64EB ** .............................. TYPE REPR CODE VALUE 1 66 0 2 66 0 3 73 32 4 66 1 5 66 6 73 7 65 8 68 0.25 9 65 FT 11 66 32 12 68 13 66 0 14 65 FT 15 66 68 16 66 1 0 66 1 ** SET TYPE - CHAN ** NAME SERV UNIT SERVICE API API API API FILE NUMB NUMB SIZE REPR PROCESS ID ORDER # LOG TYPE CLASS MOD NUMB SAMP EL~ CODE (HEX) ....................................................................................... DEPT FT 194620 O0 000 O0 0 3 1 1 4 68 0000000000 GR SBT GAPI 194620 O0 000 O0 0 3 1 1 4 68 0000000000 CCL SBT V 194620 O0 000 O0 0 3 1 1 4 68 0000000000 TTENSBT LB 194620 O0 000 O0 0 3 1 1 4 68 0000000000 TEN SBT 194620 O0 000 O0 0 3 1 1 4 68 0000000000 SPD SBT F/HR 194620 O0 000 O0 0 3 1 1 4 68 0000000000 RB SBT DEG 194620 O0 000 O0 0 3 1 1 4 68 0000000000 DEV SBT DEG 194620 O0 000 O0 0 3 1 1 4 68 0000000000 ** DATA ** DEPT. TEN. SBT 7248.000 GR.SBT 61.820 CCL.SBT 478.890 SPD.SBT 1499.850 RB.SBT DEPT. 4966.000 GR.SBT 57.706 CCL.SBT TEN. SBT -500.000 SPD.SBT 0.000 RB.SBT 50.000 TTEN. SBT 2350.668 68.782 DEV. SBT 44.342 11.000 TTEN. SBT 3000.000 0.000 DEV. SBT 0.000 ** END OF DATA ** LIS Tape Verification Listing Schlumberger Alaska Computing Center 4-AUG-1998 10:57 PAGE: **** FILE TRAILER **** FILE NAME : EDIT .003 SERVICE : FLIC VERSION : O01CO1 DATE : 98/08/ 4 MAX REC SIZE : 1024 FILE TYPE : LO LAST FILE : **** FILE HEADER **** FILE NAME : EDIT .004 SERVICE : FLIC VERSION : O01CO1 DATE : 98/08/ 4 MAX REC SIZE : 1024 FILE TYPE : LO LAST FILE : FILE~ER FILE NUMBER 4 RAW CURVES Curves and log header data for each pass in separate files; raw background pass in last file PASS NUMBER: 2 DEPTH INCREFiENT: 0.2500 FILE SUF2W~ARY VENDOR TOOL CODE START DEPTH SBT 7248.0 $ LOG HEADER DATA DATE LOGGED: SOFTWARE VERSION: TIME LOGGER ON BOTTOM: TD DRILLER (FT) : TD LOGGER (FT) : TOP LOG INTERVAL (FT) : BOTTOM LOG INTERVAL (FT) : LOGGING SPEED (FPHR) : DEPTH CONTROL USED (YES/NO): TOOL STRING (TOP TO BOTTOM) VENDOR TOOL CODE TOOL TYPE GR GAM~A RAY SBT SEGMENTED BOND $ BOREHOLE AND CASING DATA OPEN HOLE BIT SIZE (IN) : STOP DEPTH .......... 7004.3 03-JUN-98 JO01 VERI.1 7320.0 4966.0 7248.0 TOOL ~ER GR 1309XA SBT 1424XA LIS Tape Verification Listing Schlumberger Alaska Computing Center 4-AUG-1998 10:57 PAGE: 10 DRILLERS CASING DEPTH (FT) : LOGGERS CASING DEPTH (FT): 7404.0 BOREHOLE CONDITIONS FLUID TYPE: FLUID DENSITY (LB/G): SURFACE TEMPERATURE (DEGF) : BOTTOM HOLE TEMPERATURE (DEGF) : FLUID SALINITY (PPM) : FLUID LEVEL (FT) : FLUID RATE AT WELLHEAD (BPM) : WATER CUTS (PCT) : GAS~OIL RATIO: CHOKE (DEG) : BRINE NEUTRON TOOL TOOL TYPE (EPITHERMAL OR THERMAL): MATRIX: MATRIX DENSITY: HOLE CORRECTION (IN) '. BLUELINE COUNT RATE NORMALIZATION IN OIL ZONE TOP NORMALIZING WINDOW (FT) : BASE NORMALIZING WINDOW (FT) : BLUELINE COUNT RATE SCALES SET BY FIELD ENGINEER FAR COUNT RATE LOW SCALE (CPS): FAR COUNT RATE HIGH SCALE (CPS): NEAR COUNT RATE LOW SCALE (CPS): A~AR COUNT RATE HIGH SCALE (CPS): TOOL STANDOFF (IN): LOG WAS RUN WITH MARKED LINE FOR PRIMARY DEPTH CONTROL. REFERENCE LOG MWD DATED 16-JUL-97 THROUGH 18-JUL-97. CEMENT COMPRESSIVE STRENGTH = 2000 PSI ASSUMED. CEMENT DATA: MIXED AND PUMPED CEMENT: 359 SX PERMAFROST "E" 12.0 PPG CEF~_2VT ADDITIVES: 0.3 LB/SX CELLO-FLAKE MIXED AND PUMPED CEMENT: 130 SX PREMIUM "G" 13.1 PPG CEMENT ADDITIVES: 0.15 LB/SX CELLO-FLAKE 0.20~ CFR-3 O . 7 5 ~ H3kLAD 344 0.1 LB/SX SUPER CBL 15 LB/SX SILICALITE THIS FILE CONTAINS THE RAW DATA FOR THE REPEAT PASS. $ LIS FORMAT DATA LIS Tape Verification Listing Schlumberger Alaska Computing Center 4-AUG-1998 10:57 PAGE: 11 ** DATA FORMAT SPECIFICATION RECORD ** ** SET TYPE - 64EB ** TYPE REPR CODE VALUE 1 66 0 2 66 0 3 73 32 4 66 1 5 66 6 73 7 65 8 68 0.25 9 65 FT 11 66 32 12 68 13 66 0 14 65 FT 15 66 68 16 66 1 0 66 1 ** SET TYPE - CHAN ** NAME SERV UNIT SERVICE API API API API FILE NUMB NUMB SIZE REPR PROCESS ID ORDER # LOG TYPE CLASS MOD NUNiB SAMP ELE~ CODE (HEX) DEPT FT 194620 O0 000 O0 0 4 1 1 4 68 0000000000 GR SBTGAPI 194620 O0 000 O0 0 4 1 1 4 68 0000000000 CCL SBT V 194620 O0 000 O0 0 4 1 1 4 68 0000000000 TTENSBT LB 194620 O0 000 O0 0 4 1 1 4 68 0000000000 TEN SBT 194620 O0 000 O0 0 4 1 1 4 68 0000000000 SPD SBT F/HR 194620 O0 000 O0 0 4 1 1 4 68 0000000000 RB SBT DEG 194620 O0 000 O0 0 4 1 1 4 68 0000000000 DEV SBT DEG 194620 O0 000 O0 0 4 1 1 4 68 0000000000 ** DATA ** DEPT. TEN. SBT 7248.000 GR.SBT 58.038 CCL.SBT 443.733 SPD.SBT 1499.850 RB.SBT DEPT. 7004.250 GR.SBT 0.000 CCL.SBT TEN. SBT -500.000 SPD.SBT 0.000 RB.SBT 50.000 TTEN. SBT 2345.619 51.519 DEV. SBT 43.917 0.000 TTEN. SBT 3000.000 0.000 DEV. SBT 0.000 ** END OF DATA ** LIS Tape Verification Listing Schlumberger Alaska Computing Center 4-AUG-1998 10:57 PAGE: 12 **** FILE TRAILER **** FILE NA~IE : EDIT .004 SERVICE : FLIC VERSION : O01CO1 DATE : 98/08/ 4 MAX REC SIZE : 1024 FILE TYPE : LO LAST FILE : **** TAPE TRAILER **** SERVICE NAM~ : EDIT DATE : 98/08/ 4 ORIGIN : FLIC TAPE NAME : 98396 CONTINUATION # : 1 PREVIOUS TAPE : CO~ : BP EXPLORATION, MPG-13, MILNE POINT, API# 50-029-22782-00 **** REEL TRAILER **** SERVICE NAM~ : EDIT DATE : 98/08/ 4 ORIGIN · FLIC REEL NAME : 98396 CONTINUATION # : PREVIOUS REEL : COfZ~IE~T : BP EXPLORATION, MPG-13, MILNE POINT, API# 50-029-22782-00 Sperry-Sun'Drilling Services LIS Scan Utility Fri Sep 12 10:19:56 1997 Reel Header Service name ............. LISTPE Date ..................... 97/09/12 Origin .................... STS Reel Name ................ UNKNOWN Continuation Number ...... 01 Previous Reel Name ....... UNKNOWN Comments ................. STS LIS Writing Technical Services Library. Tape Header Service name ............. LISTPE Date ..................... 97/09/12 Origin ................... STS Tape Name ................ UNKNOWN Continuation Number ...... 01 Previous Tape Name ....... UNKNOWN Comments ................. STS LIS Writing Technical Services Library. Physical EOF Comment Record TAPE HEADER MILNE POINT UNIT MWD/MAD LOGS WELL NAME: API NUMBER: OPERATOR: LOGGING COMPANY: TAPE CREATION DATE: JOB DATA JOB NUMBER: LOGGING ENGINEER: OPERATOR WITNESS: SURFACE LOCATION SECTION: TOWNSHIP: RANGE: FNL: FSL: FEL: FWL: ELEVATION (FT FROM MSL 0) KELLY BUSHING: DERRICK FLOOR: GROUND LEVEL: MWD RUN 2 AK-MM-70204 PIEPER ANGLEN Date 0t,- 03_ OI MPG-13 500292278200 BP EXPLORATION SPERRY-SUN 12-SEP-97 27 13N 10E 1956 3439 .00 58.60 29.60 Scientific Scientific (ALASKA) , INC. DRILLING SERVICES RECEIVED SEP '1 7 ~997 Alasks Oil & Gas ,~s, C:emmJs~o!~, Anchorage WELL CASING RECORD 1ST STRING 2ND STRING 3RD STRING PRODUCTION STRING REI~RK S: OPEN HOLE CASING DRILLERS BIT SIZE (IN) SIZE (IN) DEPTH (FT) 20.000 112.0 8.500 7421.0 1. ALL DEPTHS ARE MEASURED DEPTHS {MD) UNLESS OTHERWISE NOTED. 2. MWD RUN #1 IS DIRECTIONAL ONLY AND IS NOT PRESENTED. 3. MWD RUN #2 IS DIRECTIONAL WITH DUAL GAMMA RAY (DGR) UTILIZING GEIGER- MUELLER TUBE DETECTORS, AND ELECTROMAGNETIC WAVE RESISTIVITY PHASE-4 (EWR4) 4. DEPTH SHIFTING/CORRECTION OF MWD DATA IS WAIVED AS PER THE PHONE CONVERSATION BETWEEN MARK VANDERGON OF BP EXPLORATION (ALASKA), INC. AND ALI TURKER OF SPERRY-SUN DRILLING SERVICES ON 09/08/97. 5. THIS WELL REACHED A TOTAL DEPTH (TD) OF 7421'MD, 4496'TVD. SROP = SMOOTHED RATE OF PENETRATION WHILE DRILLING. SGRC = SMOOTHED GAMMA RAY COMBINED. SEXP = SMOOTHED PHASE SHIFT-DERIVED RESISTIVITY (EXTRA-SHALLOW SPACING). SESP = SMOOTHED PHASE SHIFT-DERIVED RESISTIVITY (SHALLOW SPACING). SEMP = SMOOTHED PHASE SHIFT-DERIVED RESISTIVITY (MEDIUM SPACING). SEDP = SMOOTHED PHASE SHIFT-DERIVED RESISTIVITY (DEEP SPACING). SFXE = SMOOTHED FORMATION EXPOSURE TIME FOR RESISTIVITY SENSOR. $ File Header Service name ............. STSLIB.001 Service Sub Level Name... Version Number ........... 1.0.0 Date of Generation ....... 97/09/12 Maximum Physical Record..65535 File Type ................ LO Previous File Name ....... STSLIB.000 Comment Record FILE HEADER FILE NUMBER: 1 EDITED MERGED MWD Depth shifted and clipped curves; all bit runs merged. DEPTH INCREMENT: .5000 FILE SUMMARY PBU TOOL CODE START DEPTH FET 4475.0 RPD 4475.0 RPM 4475.0 RPS 4475.0 RPX 4475.0 STOP DEPTH 7363.5 7363.5 7363.5 7363.5 7363.5 GR 4482.0 7371.0 RO? 4532.5 7421.0 $ BASELINE CURVE FOR SHIFTS: CURVE SHIFT DATA (MEASURED DEPTH) EQUIVALENT UNSHIFTED DEPTH BASELINE DEPTH $ MERGED DATA SOURCE PBU TOOL CODE BIT RUN NO MERGE TOP MERGE BASE I~D 2 4532.0 7421.0 $ REMARKS: MERGED MAIN PASS. $ Data Format Specification Record Data Record Type .................. 0 Data Specification Block Type ..... 0 Logging Direction ................. Down Optical log depth units ........... Feet Data Reference Point .............. Undefined Frame Spacing ..................... 60 .liN Max frames per record ............. Undefined Absent value ...................... -999.25 Depth Units ....................... Datum Specification Block sub-type...0 Name Service Order Units Size Nsam Rep DEPT FT 4 1 68 ROP MWD FT/H 4 1 68 GR MWD AAPI 4 1 68 RPX MWD OHM~ 4 1 68 RPS MWD OHMM 4 1 68 RPM MWD OHMM 4 1 68 RPD MWD OHMM 4 1 68 FET MWD HOUR 4 1 68 Code Offset Channel 0 1 4 2 8 3 12 4 16 5 2O 6 24 7 28 8 Name Min Max Mean DEPT 4475 7421 5948 ROP 14.1156 912.305 229.018 GR 15.5736 112.252 60.7295 RPX 0.9615 80.6947 7.1953 RPS 0.9735 67.6329 7.49948 R?M 0.9607 63.7239 7.27385 RPD 0.9397 56.3699 7.50721 FET 0.1222 10.7901 0.866654 Nsam 5893 5778 5779 5778 5778 5778 5778 5778 First Reading 4475 4532.5 4482 4475 4475 4475 4475 4475 Last Reading 7421 7421 7371 7363.5 7363.5 7363.5 7363.5 7363.5 First Reading For Entire File .......... 4475 Last Reading For Entire File ........... 7421 File Trailer Service name ............. STSLIB.001 Service Sub Level Name... Version Number ........... 1.0.0 Date of Generation ....... 97/09/12 Maximum Physical Record..65535 File Type ................ LO Next File Name ........... STSLIB.002 Physical EOF File Header Service name ............. STSLIB.002 Service Sub Level Name... Version Number ........... 1.0.0 Date of Generation ....... 97/09/12 Maximum Physical Record..65535 File Type ................ LO Previous File Name ....... STSLIB.001 Conunent Record FILE HEADER FILE NUMBER: 2 RAW MWD Curves and log header data for each bit run in separate files. BIT RUN NUMBER: 2 DEPTH INCREMENT: .5000 FILE SUMMARY VENDOR TOOL CODE START DEPTH STOP DEPTH FET 4475.0 7363.5 RPD 4475.0 7363.5 RPM 4475.0 7363.5 RPS 4475.0 7363.5 RPX 4475.0 7363.5 GR 4482.0 7371.0 ROP 4532.5 7421.0 $ LOG HEADER DATA DATE LOGGED: 17-JUL-97 SOFTWARE SURFACE SOFTWARE VERSION: 5.06 DOWNHOLE SOFTWARE VERSION: 5.46 DATA TYPE (MEMORY OR REAL-TIME): MEMORY TD DRILLER (FT): 7421.0 TOP LOG INTERVAL (FT): 4532.0 BOTTOM LOG INTERVAL (FT): 7421.0 BIT ROTATING SPEED (RPM): HOLE INCLINATION (DEG MINIMUM ANGLE: 37.4 MAXIMUM ANGLE: 75.6 TOOL STRING (TOP TO BOTTOM) VENDOR TOOL CODE TOOL TYPE DGR DUAL GAMMA RAY EWR4 $ ELECTROMAG. RESIS. 4 BOREHOLE AI~D CASING DATA TOOL NUMBER P0771CRG6 P0771CRG6 OPEN HOLE BIT SIZE (IN): DRILLER'S CASING DEPTH (FT) : BOREHOLE CONDITIONS I~UD TYPE: I~JD DENSITY (LB/G): I~JD VISCOSITY (S) : MUD PH: MUD CHLORIDES (PPM) : FLUID LOSS (C3): RESISTIVITY (OHMS) AT TEMPERATURE (DEGF) MUD AT MEASURED TEMPERATURE (MT): MUD AT MAX CIRCULATING TERMPERATURE: MUD FILTRATE AT MT: MUD CAKE AT MT: NEUTRON TOOL MATRIX: MATRIX DENSITY: HOLE CORRECTION (IN): TOOL STANDOFF (IN): EWR FREQUENCY (HZ): REMARKS: $ Data Format Specification Record Data Record Type .................. 0 Data Specification Block Type ..... 0 Logging Direction ................. Down Optical log depth units ........... Feet Data Reference Point .............. Undefined Frame Spacing ..................... 60 .liN Max fzames per record ............. Undefined Absent value ...................... -999.25 Depth Units ....................... Datum Specification Block sub-type...0 8.500 8.5 SPUD 9.00 70.0 9.0 8OO 5.2 3.600 2. 600 3.500 3.800 Name Service Order Units Size Nsam Rep Code Offset Channel DEPT FT 4 1 68 0 1 GR MWD 2 AAPI 4 1 68 4 2 RPX MWD 2 OHP~ 4 1 68 8 3 RPS MWD 2 OHMM 4 1 68 12 4 RPM MWD 2 OHI{M 4 1 68 16 5 RPD MWD 2 OHMH 4 1 68 20 6 ROP MWD 2 FT/H 4 1 68 24 7 FET MWD 2 HOUR 4 1 68 28 8 31.7 First Name Min Max Mean Nsam Reading DEPT 4475 7421 5948 5893 4475 GR 15.574 112.252 60.7295 5779 4482 RPX 0.961 80.695 7.19529 5778 4475 RPS 0.974 67.633 7.49948 5778 4475 RPM 0.961 63.724 7.27385 5778 4475 RPD 0.94 56.37 7.50721 5778 4475 ROP 14.116 912.305 229.018 5778 4532.5 Last Reading 7421 7371 7363.5 7363.5 7363.5 7363.5 7421 FET 0.122 10.79 0.86666 5778 4475 7363.5 First Reading For Entire File .......... 4475 Last Reading For Entire File ........... 7421 File Trailer Service name ............. STSLIB.002 Service Sub Level Name... Version Number ........... 1.0.0 Date of Generation ....... 97/09/12 Maximum Physical Record..65535 File Type ................ LO Next File Name ........... STSLIB.003 Physical EOF Tape Trailer Service name ............. LISTPE Date ..................... 97/09/12 Origin ................... STS Tape Name ................ UNKNOWN Continuation Number ...... 01 Next Tape Name ........... UNKNOWN Comments ................. STS LIS Writing Library. Technical Services Reel Trailer Service name ............. LISTPE Date ..................... 97/09/12 Origin ................... STS Reel Name ................ UNKNOWN Continuation Number ...... 01 Next Reel Name ........... UNKNOWN Comments ................. STS LIS Writing Library. Technical Services Scientific Scientific Physical EOF Physical EOF End Of LIS File