Alaska Logo
Department of Commerce, Community, and Economic Development
Alaska Oil and Gas Conservation
Commission
Loading...
HomeMy WebLinkAbout197-087XHVZE Pages NOT Scanned in this Well History File This page identifies those items that were not scanned during the initial scanning Project. They are available in the original file and viewable by direct inspection. / q '1- O?r'/File Number of Well History File PAGES TO DELETE RESCAN Color items - Pages: GraYScale, halftones, pictures, graphs, charts - Pages: ~ ~ 2~ Poor Quality Original- Pages: Other- Pages: DIGITAL DATA Diskettes, No. [3 Other, No/Type 'OVERSIZED .Logs of vadous kinds n Other Complete COMMENTS: Scanned TO RE-SCAN Nathan Lowell Notes: Re-Scanned by: ~v.~ Mildred Daretha Nathan Lowell Date: /s/ STATE OF ALASKA -~~. ALAS~IL AND GAS CONSERVATION CONSIGN WELL COMPLETION OR RECOMPLETION REPORT AND LOG DECEIVE MAR 0 6 200 mission 1a. Well Status: ^ Oil ^ Gas ^ Plugged ®Abandoned ^ Suspended 2oAAC 2s.,os zoAAC 2s.,,o ^ GINJ ^ WINJ ^ WDSPL ^ WAG ^ Other No. of Completions Zero 1b. Well Class:~~•h ®Developm' en-f exploratory ^ Service ^ Stratigraphic 2. Operator Name: BP Exploration (Alaska) Inc. 5. Date Comp., Susp., or Aban 2/11/2008 12. Permit to Drill Number 197-087 306-211 3. Address: P.O. Box 196612, Anchorage, Alaska 99519-6612 6. Date Spudded 05/30/1997 13. API Number 50-029-21530-01-00 4a. Location of Well (Governmental Section): Surface: 1716' SNL ' 7. Date T.D. Reached 06/12/1997 14. Well Name and Number: PBU D-26A , 1692 WEL, SEC. 23, T11 N, R13E, UM Top of Productive Horizon: 277' NSL, 986' WEL, SEC. 15, T11 N, R13E, UM 8. KB (ft above MSL): 72.7' Ground (ft MSL): 41.6' 15. Field /Pool(s): Prudhoe Bay Field / Prudhoe Bay Total Depth: 253' SNL, 2044' WEL, SEC. 22, T11 N, R13E, UM 9. Plug Back Depth (MD+TVD) 12415 9037 Pool 4b. Location of Well (State Base Plane Coordinates, NAD 27): Surface: x- 653463 y- 5959273 Zone- ASP4 10. Total Depth (MD+TVD) 12490 9051 16. Property Designation: ADL 028284 TPI: x- 648848 y- 5961173 Zone- ASP4 Total Depth: x- 647801 y- 5960622 Zone- ASP4 11. SSSV Depth (MD+TVD) None 17. Land Use Permit: 18. Directional Survey ^ Yes ®No Submit electronic and rinted information er 20 AAC 25.050 19. Water depth, if offshore N/A ft MSL 20. Thickness of Permafrost (TVD): 1900' (Approx.) 21. Logs Obtained (List all logs here and submit electronic and printed information per 20 AAC 25.071): BRCS / IND / CNL / GR 22. CASING, LINER AND CEMENTING RECORD CASING SETTING DEPTH MD' SETTING DEPTH TVD HOLE AMOUNT WT. PER FT. GRADE TOP BOTTOM TOP BOTTOM SIZE CEMENTING RECORD PULLED 20" Insulated C nductor Surface 110' Surface 110' 36" 8 cu ds Concrete 13-3/8" 72# L-80 Surface 2709' Surface 2709' 17-1/2" 3260 cu ft PE'E' 465 cu ft PF 9-5/8" 47# L-80 Surface 10137' Surface 8478' 12-1/4" 1880 cu ft Class'G' 230 cu ft'G' 7" 29# L-80 9867' 10808' 8282' 8977' 8-1/2" 435 cu ft Class'G' 2-7/8" 6.16# L-80 10157' 12482' 8493' 9050' 3-3/4" 95 cu ft Class 'G' 23. Open to production or inject ion? ^ Yes ®No 24. TUBING RECORD If Yes, list each interval open (MD+TVD of Top 8~ Bottom; Perforation Size and Number): SIZE DEPTH .SET MD PACKER SET MD 4-1/2", 12.6#, L-80 10066' - 10749' 10741' MD TVD MD TVD ~ 7 ' 25. Aclo, FRACTURE, CEMENT SQUEEZE, ETC. y ~ ~i~ MAY "" ~ 2008 DEPTH INTERVAL MD AMOUNT & KIND OF MATERIAL USED 9828' Set EZ-SVB (Two Plugs) 9530' Set Cement Plug w/ 20 Bbls Class'G' 8315' Set HES EZSV 8282' Set Whipstock 26. PRODUCTION TEST Date First Production: Not on Production Method of Operation (Flowing, Gas Lift, etc.): N/A Date Of Test: HOUfS Tested: PRODUCTION FOR TEST PERIOD OIL-BBL: GAS-MCF: WATER-BBL: CHOKE SIZE: GAS-OIL RATIO: Flow Tubing PreSS. Casing Press: CALCULATED 24-HOUR RATE OIL-BBL: GAS-MCF: WATER-BBL: OIL GRAVITY-API (CORK): 27. CORE DATA Conventional Core(s) Acquired? ^ Yes ®No Sidewal l Cores Ac uired? ^ Yes ®No If Yes to either question, list formations and intervals cored (MD+TVD of top and bottom of each), and summarize lithology and presence of oil, gas or water (submit separate sheets with this form, if needed). Submit detailed descriptions, core chips, photographs and laboratory analytical results p~t2D AAE~:~71. None a Form 10-407 Revised 02/2007 C(1NTINIIFf7 ON REVERSE Slnr ~ II ~ ) I I 6~~ ( ~ ~~'~~ a ~~tl ~ ~ G 2S. GEOLOGIC MARKERS (LIST ALL FORMATIONS A KERS ENCOUNTERED): 29. FORMATION TESTS ' NAME TVD Well Teste ^ Yes ®No Permafrost Top If yes, list intervals and formations tested, briefly summarizing test results. Attach separate sheets to this form, if needed, and submit Permafrost Base detailed test information per 20 AAC 25.071. 23N 10826' 8990' None 23P 10828' 8991' 22N 10838' 8998' 22P 10841' 9000' HOT 10880' 9021' 21 TS 10890' 9026' 21 N 10918' 9038' 21 P 10934' 9043' Zone 2A 10950' 9048' 21 P 11036' 9044' 21 N 11046' 9042' HOT 11150' 9023' 22P 11245' 9004' 22N 11255' 9003' 23P 11284' 8998' 23N 11298 8997' 23N 12258' 9015' 23P 12270' 9016' 22N 12310' 9020' 22P 12340' 9024' HOT 12388' 9032' Formation at Total Depth (Name): HOT 12388' 9032' 30. List of Attachments: Summary of Daily Drilling Reports, Well Schematic Diagram 31. I hereby certify that the fore oing is true and correct to the best of my knowledge. cc~~ ~~ Signed Terrie Hubble Title Drilling Technologist Date /b`~~ PBU D-26A 197-087 306-211 Prepared By NameMumber: Terrie Hubble, 564-4628 Drilling Engineer: John Rose, 564-5271 Well Number Permi No. / A royal No. INSTRUCTIONS GeNew-L: This form is designed for submitting a complete and correct well completion report and log on all types of lands and leases in Alaska. Submit a well schematic diagram with each 10-407 well completion report and 10-404 well sundry report when the downhole well design is changed. IreM 1a: Classification of Service Wells: Gas Injection, Water Injection, Water-Alternating-Gas Injection, Salt Water Disposal, Water Supply for Injection, Observation, or Other. Multiple completion is defined as a well producing from more than one pool with production from each pool completely segregated. Each segregated pool is a completion. IreM 4b: TPI (Top of Producing Interval). IreM 8: The Kelly Bushing and Ground Level elevation in feet above mean sea level. Use same as reference for depth measurements given in other spaces on this form and in any attachments. ITeM 13: The API number reported to AOGCC must be 14 digits (ex: 50-029-20123-00-00). IreM 20: Report true vertical thickness of permafrost in Box 20. Provide MD and TVD for the top and base of permafrost in Box 28. ITeM 22: Attached supplemental records for this well should show the details of any multiple stage cementing and the location of the cementing tool. ITeM 23: If this well is completed for separate production from more than one interval (multiple completion), so state in item 1, and in item 23 show the producing intervals for only the interval reported in item 26. (Submit a separate form for each additional interval to be separately produced, showing the data pertinent to such interval). ITeM 26: Method of Operation: Flowing, Gas Lift, Rod Pump, Hydraulic Pump, Submersible, Water Injection, Gas Injection, Shut-In, or Other (explain). IreM 27: Provide a listing of intervals cored and the corresponding formations, and a brief description in this box. Submit detailed description and analytical laboratory information required by 20 AAC 25.071. IreM 29: Provide a listing of intervals tested and the corresponding formation, and a brief summary in this box. Submit detailed test and analytical laboratory information required by 20 AAC 25.071. Form 10-407 Revised 02/2007 Submit Original Only • BP EXPLORATION Page 1 of 12 Operations Summary Report Legal Well Name: D-26 Common Well Name: D-26 Spud Date: 1/21/1986 Event Name: REENTER+COMPLETE Start: 2/6/2008 End: Contractor Name: NABOBS ALASKA DRILLING I Rig Release: Rig Name: NABOBS 7ES Rig Number: Date ~ From - To ~ Hours Task Code NPT Phase Description of Operations 2/5/2008 15:00 - 23:30 8.50 MOB P PRE Prepare to move Nabors 7ES from Q-pad to D-26B. Move pits, Iliamna Camp, Truck Shop from O-pad to D-26. 23:30 - 00:00 0.50 MOB P PRE Move sub down O-pad access road onto Spine road. 2/6/2008 00:00 - 04:00 4.00 MOB P PRE Continue to move rig onto Spine road, down D-pad access road and arrive on D-pad at 3:30. 04:00 - 07:00 3.00 RIGU P PRE Spread herculite and spot rig over well D-26. Set mats and set down sub. 07:00 - 08:00 1.00 RIGU P PRE Spot pits along sub and connect electrical lines. Start heating pits. 08:00 - 00:00 16.00 RIGU N WAIT PRE Wait on temperature to reach -35 degrees F to raise derrick. Work on available tasks: winterize cellar, inspect derrick, prepare floor, winterize rig, spot cuttings tank and burm, bring on heated seawater to pits, rig up lines to circ out freeze protect, shovel snow, clean rig, etc. 2/7/2008 00:00 - 05:30 5.50 RIGU N WAIT PRE Continue to wait on weather to raise derrick. 05:30 - 09:00 3.50 RIGU P PRE Raise derrick and bridle down. Finish rigging up rig floor. Connect blocks and top drive Accept rig ~ 9:00 hours. 09:00 - 10:00 1.00 BOPSU P PRE RU DSM ubri ator II the BPV. 10:00 - 13:00 3.00 KILL P DECOMP RU circ lines and circ out diesel freeze protect. 3 bpm, 120 psi. Recovered 137 bbls diesel and returned for recycle. Displaced well w/sea water. BD/RD circ lines. 13:00 - 13:30 0.50 WHSUR P DECOMP Install TWC and test from below to 1000 si. 13:30 - 16:30 3.00 BOPSU P DECOMP PJSM for ND/NU. ND tree and adapter flange. NU BOPE, Hook up service lines and install riser. Fill stack with sea water. 16:30 - 21:30 5.00 BOPSU P DECOMP RU test Equipment. Test BOPE with 4" and 4.5" test ioints. Test 250 psi low and 3500 psi high. Good test. Test witnessed by Lenward ToussanUChris Weaver, Nabors Tool Pushers and Kris Honas/Duncan Ferguson BP WSL. Test witness waived by AOGCC rep Bob Noble. 21:30 - 23:30 2.00 BOPSU P DECOMP PJSM to RU lubricator. RU DSM 7" lubricator and extension. Test lubricator to 500 si. Unable to engage TWC. RU centralizer on lubricator. En a e TWC and ull. RD DSM lubricator and extension. 23:30 - 00:00 0.50 PULL P DECOMP RU to ull 4-1/ " strip . MU TC-II crossover and back out lock down screws. 2/8/2008 00:00 - 03:30 3.50 PULL P DECOMP Pull tubing hanger to rig floor with 50K pick up weight. Tubing hanger in good condition. Send to FMC for re-dress and re-run. Pull 2,544' of 4-1/2" tubing and lay down. Clean and clear rig floor. SIMOPS: Pressure test O.A. to 1000 psi with diesel (continue to pull tubing). Printed: 2/27/2008 3:00:28 PM • • BP EXPLORATION Page 2 of 12 .Operations Summary Report Legal Well Name: D-26 Common Well Name: D-26 Spud Date: 1/21/1986 Event Name: REENTER+COMPLETE Start: 2/6/2008 End: Contractor Name: NABORS ALASKA DRILLING I Rig Release: Rig Name: NABORS 7ES Rig Number: Date From - To Hours Task Code NPT Phase Description of Operations 2/8/2008 03:30 - 06:30 3.00 WHSUR P DECOMP RU FMC tools to pull 9-5/8" packoff through stack. J into packoff and pull 40K over (75K PU). Set new ackoff and run in lock down screws. Pressure test new packoff to 5000 psi for 10 minutes. 06:30 - 08:00 1.50 WHSUR P DECOMP Te t lower BOP ram with 4" and 4-1/2" test joint to 250 psi low and 3500 psi high. RD test equipment. 08:00 - 11:30 3.50 WHSUR P DECOMP PJSM with all hands. Prepare floor and pipe shed to pickup cleanout BHA. Pickup 8.5" cleanout BHA with used MXL tricone bit, drill collars, hydraulic jars, and HW drill pipe. RIH to 824'. 11:30 - 14:00 2.50 WHSUR P DECOMP RIH picking up 4" drill pipe singles to 3003'. Tag EZSV plug. 14:00 - 16:30 2.50 WHSUR P DECOMP Drill EZSV plug from 3003' to 3006', 16:30 - 22:00 I 5.501 WHSUR I P 22:00 - 23:00 1.00 I WHSUR I P 23:00 - 23:30 I 0.501 WHSUR I P 23:30 - 00:00 I 0.501 WHSUR I P 2/9/2008 100:00 - 02:00 I 2.00 I CLEAN I P 02:00 - 05:00 3.00 CLEAN P 05:00 - 06:30 1.50 CLEAN P 06:30 - 07:30 I 1.001 CLEAN I P 07:30 - 13:00 I 5.501 DHB I P 13:00 - 14:00 I 1.001 DHB I P 14:00 - 15:00 I 1.001 DHB I P 15:00 - 17:00 I 2.001 DHB I P 420 GPM, 740 psi, 25K WOB, 60 RPM, 2K TO, 95K ROT. Work pipe through drilled area several time after drilling with no drag or overpull. DECOMP RIH picking up drill pipe singles and push junk to 2nd EZSV. Tag 2nd EZSV at 9828' Set down 5K. DECOMP Circulate bottoms up rotating and reciprocating. 508 GPM, 2289 psi, 60 RPM, 4K TO, 180K PU, 150K SO, 165K ROT. DECOMP Monitor well: small amount of gas breaking out at flow nipple. Decided to Circulate -1/2 bottoms up. DECOMP Circulate 288 bbls reciprocating pipe. 525 GPM, 2383 psi, 180K PU, 165K SO. DECOMP Monitor Well: No flow, no gas. Well slightly out of balance. Heavy on annulus side. Pull 10 stands checking displacements every 5 stands. Displacements good. DECOMP Pump a dry job and continue to POOH racking back 4" drillpipe stands to 324'. DECOMP Stand back drill collars and break out bit on 9-5/8" cleanout BHA. DECOMP Clean and clear the rig floor. Change out handling equipment. DECOMP Trip in hole with 4" drill pipe to set balanced cement plug. Ta EZSV at 9828'. Pick up to 9813' DECOMP PJSM w/ SLB cement crew and rig hands. RU SLB Cementing equipment. Circulate seawater 211 gpm, 497 psi. DECOMP Pump 10 bbls of water with SLB cementing unit. Test cement lines to 3500 psi. Pump 19 bbls of water followed by 20 bbls of 15.8 ppg Class G cement followed b 5 bbls of water. witch to rig pumps and displace cement with 88 bbls of 8.5 ppg seawater. DECOMP POOH from 9813' to 9530' and circulate out any excess cement (reciprocate pipe). 518 gpm, 2035 psi, 613 bbls 150K PU, 140K SO. Printed: 2/27/2008 3:00:28 PM • ~ BP EXPLORATION' Page 3 of 12 Operatiolns Summary Repor# Legal Well Name: D-26 Common Well Name: D-26 Spud Date: 1/21/1986 Event Name: REENTER+COMPLETE Start: 2/6/2008 End: Contractor Name: NABORS ALASKA DRILLING I Rig Release: Rig Name: NABORS 7ES Rig Number: Date From - To Hours Task Code NPT Phase Description of Operations 2/9/2008 15:00 - 17:00 2.00 DHB P DECOMP Noted comtaminated cement on bottoms uo by off spike. Drop a drill pipe wiper and circulate to mule shoe. POOH to 9083'. 17:00 - 18:00 1.00 DHB P DECOMP PJSM. Slip and cut 136' of drilling line. 18:00 - 22:00 4.00 DHB P DECOMP POOH with 4" drill pipe racking back stands. Clean and clear the rig floor. 22:00 - 00:00 2.00 DHB P DECOMP PJSM with SLB E-line crew and rig hands for GR/JB and CCL run. RU E-line and RIH with 8.5" Gage ring/ junk basket and CCL. 2/10/2008 00:00 - 03:00 3.00 DHB P DECOMP Continue to RIH with 8.5" gage ringljunk basket. 1Fag up at 6420'. Pick up and attempt to work past 6420' for 20 minutes without success. POOH with GR(JB. gunk basket full of thick tar/garafin substance as well as some rubber and brass pieces from the drNled uo EZSV. 03:00 - 06:00 3.00 DHB P DECOMP RiH with 8.25" gage ringijunk basket to 8500'. Prepare a cleanout BHA from Baker to include: 8-112" bit, scrapper, boot baskets, bit sub, upper mill, bumper sub, jar, and drill collars. POOH with 8.25" a e rin 'unk basket. Basket only 1/4 full of tar/paraffin. 06:00 - 09:30 3.50 DHB P DECOMP wit 8.45" gage ring/junk basket to 8500'. POOH with very little in the junk basket. 09:30 - 13:30 4.00 DHB P DECOMP RiH with 9-518" HES EZSV plug. Set lu at 8315' MD 5' above 9-518" c Il r. POOH and rig down SLB E-line. 13:30 - 14:30 1.00 DHB P DECOMP RU and test 9-5/8" casing to 3500 psi for 30 minutes. Good test. Rig down and blow down lines. 14:30 - 17:30 3.00 STWHIP P WEXIT MU 9-5/S" Whipstock BHA to include: Anchor, Whipstock Slide, Window Mill, Lower String Mill, Flex Joint, Upper String Mill, HW, Sub, MWD, UBHO, Bumper Sub, and Drill Collars. RIH to 983' 17:30 - 18:30 1.00 STWHIP P WEXIT Pertorm a shallow test on MWD equipment at 983'. 18:30 - 23:00 4.50 STWHIP P WEXIT RIH with 9-5/8" Whipstock BHA to 8268' MD on 4" drill pipe stands at 90 seconds/stand. 23:00 - 00:00 1.00 STWHIP P WEXIT Displace the wellbore from seawater to 9.0 ppg LSND drilling fluid. 442 gpm, 1082 psi. 2/11/2008 00:00 - 00:30 0.50 STWHIP P WEXIT Continue to Displace welt to 9.0 PPG LSND drilling fluid. 442 gpm, 1082 psi. 00:30 - 01:00 0.50 STWHIP P WEXIT Unable to obtain MWD signals. Adjust pump rates between 0 gpm and 600 gpm several times. Eventually recieved good signals. Surtace indicator confirmed that the modulator was jammed. 01:00 - 02:00 1.00 STWHIP P WEXIT Orient Whipstock to 60 degrees right of high side. Set down 14K to shear Whipstock anchor. Set down 20K to ensure good set. Pick up and observe 5K overpull (anchor is set). Set down 38K to shear mill from Whipstock slide. Top of window at 8282' MD. tt __ ICJ Printed: 2/27/2008 3:00:28 PM TREIa~= 4" CNV WELLHEAD = FMC -- ACTUATOR= - __ AXELSON KB. ELEV = BF. ELEV = 70.5' - 42.42' KOP = 3400' Nlax Angle= Datum MD = 93° ~ 11347' 10457' Datum TVD = 8800' SS DRLG DRAFT 4-1/2", 12.6#, 13Cr, Vam-Top Tubing - 9773' MD D-26B TOW - 8282" MD-- Top of 7" Liner - 8058' MD X-Nipples (3.813" ID) - 9731 ` 8 9666' MD BOT S-3 Packer - 9697' MD XN-Nipple w.3.725" NoGo - 9761 ` BOT 4-1/2" Liner Top 11' TBS - 9766' MD 7", 26#, L-80, BTC-M, Liner - 9907` MD - 4-1/2" WLEG - 9772" MD Perf's (4-1/2" Liner) at 11300`-11950' MD and 12100'-12400' MD~ TOP OF 2-7/8' LNR 10157' 4-1/2", 11.6#, L-80, IBT-M Liner 12,500' MD Min. ID = XN Nipple 3.725" 9758` MD ~ 4-112" TBG, 12.6#, L-80, .0152 bpf, ID = 3.958" I-1 10749' PERFORATION SUMMARY REF LOG: SPERRY SUN GR/ROP O6/03/97 ANGLEATTOPPERF:92° ~ 11300' Note: Refer to Roduction DB for historical perf data SIZE SPF INTERVAL OpNSgz DATE z-7/8° s 11300 -11950 0 o2/23ro8 2-7/8" 6 121 ~ - 12400 O 02/23/08 WHIPSTOCK I-{ 10765' I PBTD I ~ 7" LNR, 26#, L-80, .0383 bpf, ID = 6.276" I 11026' 11068' 4-1/2" X-Nipple (3.813" ID) - 2187' MD 13-3/8" Shoe - 2707' MD GA S L IFT MA NDRFI S ST MD TVD DEV TYPE VLV LATCH PORT 3 3137 3136 7 MMG DCR SHEAR 0 2 5646 5278 50 MMG DMY RK 0 1 7401 6452 46 MMG DMY RK 0 ~ BOT 7" Liner Top (10' TBS) - 8058' MD /BOT 9-5/8"Whipstock (TOW - 8282` MD) 5/8" HES EZSV - 8315' MD %TOC - -9530' MD (-250' Cement) ~9-5/8" HES EZSV - 9828' MD ~ TOP OF 7" LNR 9$67' ~ 9-5/B" CSG, 47/1, L-B0, ID = 8.681" 10136' 10066' TOP OF 41/2" DRESSED STUMP (D16 RKB) 10128' BKR ~P FISH (06101 /05). SOME JUNK REMA WING ON TOP OF R (D16 RKB) 101ST ~DEPLOYMEMSLEEVE 10676' 4112" OTIS XA SLDING SLV, ~ = 3.813" j 10701'-10738' ~~ BLA ST JOINTS 10739' BKR K-22 A NCHOR 10741' 7" X 41/2" BKR PKR, ID = 4.00" 10746' 1-141 /2" OTIS XN NIP, ID = 3. 10749' --i41 /2" BKR TBG TA ~, ID = 4.00" 10765 -~ MD TT LOGGED 02109/86 MILLOUT WINDOW 10808' - 10816' - Abandon Perfs - 11,150' - 12,390' MD P67D H 12415' 2-7/8" LNR, 6.16#, L-80, .0058 bpf, ID = 2.37" DATE REV BY COMMENTS DATE REV BY COMMENTS 02/12/86 ORIGINAL COMPLETION 04/07/89 DFF RWO 06/17/97 INHITLO SIDETRACK 06/01/05 JDMITLH RWO SUSPHHD® 02!25!08 MES SIDETRACK h-~~1~ PRUDHOE BAY UWfT WELL: D-26B PERMfT No: 2060980 API No: SO-029-21530-02 SEC 23, T1 1 N, R13E BP Exploration (Alaska) ~,~,,, STATE OF ALASKA '~~¢ ALASKA OIL AND GAS CONSERVATION COMMISSION WELL COMPLETION OR RECOMPLETION REPORT AND LOG ~0.~as~~ r ~ r~~, `` ins. Cammi~~i~~ Well Status: ^ Oil ^ Gas ^ Plugged ^ Abandoned ®Suspended 1a 1b. Well Clas~s~:~l#ut~898 . zoAAC z5.,os zoAAC zs.,,o ®Development ^ Exploratory ^ GINJ ^ WINJ ^ WDSPL ^ WAG ^ Other No. of Completions One ^ Service ^ Stratigraphic 2. Operator Name: 5. Date Comp., Susp., or Aban 12. Permit to Drill Number ~ BP Exploration (Alaska) Inc. ~~ 06/02/2005 197-087 _ 3 7 ~- 3. Address: 6. Date Spudded 13. API Number ~~ P.O. Box 196612, Anchora e, Alaska 99519-6612 05/30/1997 50-029-21530-01-00 4a. Location of Well (Governmental Section): 7. Date T.D. Reached 14. Well Name and Number: Surface: 06/12/1997 PBU D-26A ~ 1716' SNL, 1692' WEL, SEC. 23, T11 N, R13E, UM 8. KB (ft above MSL): 72.7' ~ 15. Field /Pool(s): Top of Productive Horizon: 277' NSL, 986' WEL, SEC. 15, T11 N, R13E, UM ~ Ground (ft MSL): 41.6' Prudhoe Bay Field / Prudhoe Bay Total Depth: 9. Plug Back Depth (MD+TVD) Pool 253' SNL, 2044' WEL, SEC. 22, T11N, R13E, UM ~ 12415 9037 4b. Location of Well (State Base Plane Coordinates, NAD 27): 10. Total Depth (MD+TVD) 16. Property Designation: Surface: x- 653463 y- 5959273 Zone- ASP4 12490 - 9051 ADL 028284 TPI: x- 648848 y- 5961173 Zone- ASP4 11. SSSV Depth (MD+TVD) 17. Land Use Permit: - 5960622 Zone- ASP4 647801 th l D T None y : x- ep ota ®No ^Y i l S 19. Water dept , if offshore ~ 20. Thickness of Permafrost (TVD): es urvey ona 18. Direct S mi I r n rin ed inform ion r 2 AAC 25.050 N/A ft MSL 1900' (Approx.) 21. Logs Obtained (List all logs here and submit electronic and printed information per 20 AAC 25.071): BRCS/IND/CNL/GR 22. CASING, LINER AND CEMENTING RECORD CASING SETTING DEPTH MD SETTING DEPTH ND HOLE AMOUNT WT. PER FT. GRADE TOP .BOTTOM TOP BOTTOM SIZE CEMENTING RECORD PULLED 2 In ul n Surfa 110' urface 11 36" 8 c ds Concre e 13-3/8" 72# L-80 Surface 2709' Surface 2709' 17-1/2" 3260 cu PF'E' 465 cu ft PF 9-5/ " 47# L-80 Surface 10137' Surface 8478' 12-114" 1880 cu ft Class'G' 230 cu ft'G' 7" - 9 6 ' 1 8 8282' 977' 8-1/2" 43 cu ft Cla 'G' 2-7/ " 6.1 L-80 10157' 12482' 8493' 90 0' 3-3/4" 95 cu lass 'G' 23. Open to production or inject ion? ®Yes ^ No 24. TUBING RECORD If Yes, list each I P & B nterval open nd Number): ti Si f .SIZE DEPTH SET MD PACKER .SET MD on ze a er ora ottom; (MD+TVD of Top ' 4 s f 11/16" Gun Diameter 1 4-1/2", 12.6#, L-80 (Kill String) 2544 , p - MD TVD MD TVD 4-1/2", 12.6#, L-80 10066' - 10749' 10741' 11150' - 11285' 9023' - 8998' 9011' 01' ' ' 25. ACID, FRACTURE, CEMENT SQUEEZE, ETC. - - 12080 90 11950 12340' - 12390' 9024' - 9032' DEPTH INTERVAL MD AMOUNT & KIND OF MATERIAL USED 9830' Set EZ-SVB (05/31/2005) 3000' Set EZ-SVB (06/01/2005) ~€r~~~l~.IAN ~ ~ 200 26. PRODUCTION TEST Date First Production: Method of Operation (Flowing, Gas Lift, etc.): Not on Production NIA Date Of Test: HOUrS Tested: PRODUCTION FOR OIL-BBL: GAS-MCF: WATER-BBL: CHOKE SIZE: GAS-OIL RATIO: TEST PERIOD Flow Tubing CaSing PreSS: CALCULATED OIL-BBL: GAS-MCF: WATER-BBL: OIL GRAVITY-API (CORK): PreSS. 24-HOUR RATE 27. CORE DATA Conventional Core(s) Acquired? ^Yes ®No Sidewall Cores Ac uired? Yes ®No If Yes to either question, list formations and intervals cored (MD+TVD of top and bottom of each), and summarize lithology and presence of oil, gas or water (submit separate sheets with this form, if needed). Submit detailed descriptions, core chips, photographs and laboratory analytical results per 20 AAC 250.071. •~ rte S~/- None , ~ . D~ C ~ ~ 7007 ~' jj ? 1? / -Q ' t`'~~ ~ ~,.. ( r ~'~ ti~ Form 1 ~-407 ReVISed 02/2007 CONTINUED C'N REVERSE SIDE 28. GEOLOGIC MARKERS (LIST ALL FORMATIONS A ~RKERS ENCOUNTERED): -- 29. FORMATION TESTS ` NAME MD TVD Well Tested? ^ Yes ®No If yes, list intervals and formations tested, briefly summarizing test Permafrost Top results. Attach separate sheets to this form, if needed, and submit Permafrost Base detailed test information per 20 AAC 25.071. 23N 10826' 8990' None 23P 10828' 8991' 22N 10838' 8998' 22p 10841' 9000' HOT 10880' 9021' 21TS 10890' 9026' 21 N 10918' 9038' 21 P 10934' 9043' Zone 2A 10950' 9048' 21 P 11036' 9044' 21 N 11046' 9042' HOT 11150' 9023' 2YP 11245' 9004' 22N 11255' 9003' 23P 11284' 8998' 23N 11298 8997' 23N 12258' 9015' 23p 12270' 9016' 22N 12310' 9020' 22p 12340' 9024' HOT 12388' 9032' Formation at Total Depth (Name): hot 12388' 9032' 30. List of Attachments: Summary of Daily Drilling Reports, Well Schematic Diagram 31. I hereby certify that the foreg ing is true and correct to the best of my knowledge. z1 i~~b Signed Terrie Hubble Title Drilling Technologist Date PBU D-26A 197-087 305-137 Prepared ByNameAVumber. Terrie Hubble, 564-4628 Well Number Permit No. / ADnroval No. Drilling Engineer: Chidi igbokwe, 564-4795 INSTRUCTIONS GENERAL: This form is designed for submitting a complete and correct well completion report and log on all types of lands and leases in Alaska. Submit a well schematic diagram with each 10-407 well completion report and 10-404 well sundry report when the downhole well design is changed. ITEM 1a: Classification of Service Wells: Gas Injection, Water Injection, Water-Alternating-Gas Injection, Salt Water Disposal, Water Supply for Injection, Observation, or Other. Multiple completion is defined as a well producing from more than one pool with production from each pool completely segregated. Each segregated pool is a completion. ITEM 4b: TPI (Top of Producing Interval). ITEM S: The Kelly Bushing and Ground Level elevation in feet above mean sea level. Use same as reference for depth measurements given in other spaces on this form and in any attachments. ITEM 13: The API number reported to AOGCC must be 14 digits (ex: 50-029-20123-00-00). ITEM 20: Report true vertical thickness of permafrost in Box 20. Provide MD and TVD for the top and base of permafrost in Box 28. ITEM 22: Attached supplemental records for this well should show the details of any multiple stage cementing and the location of the cementing tool. ITEM 23: If this well is completed for separate production from more than one interval (multiple completion), so state in item 1, and in item 23 show the producing intervals for only the interval reported in item 26. (Submit a separate form for each additional interval to be separately produced, showing the data pertinent to such interval). ITEM 26: Method of Operation: Flowing, Gas Lift, Rod Pump, Hydraulic Pump, Submersible, Water Injection, Gas Injection, Shut-In, or Other (explain). ITEM 27: Provide a listing of intervals cored and the corresponding formations, and a brief description in this box. Submit detailed description and analytical laboratory information required by 20 AAC 25.071. ITEM 29: Provide a listing of intervals tested and the corresponding formation, and a brief summary in this box. Submit detailed test and analytical laboratory information required by 20 AAC 25.071. Form 10-407 Revised 02/2007 Submit Original Only ;~ Welf: D-26A Accept: 04/28/05 Accept: 05/25/05 Field: Prudhoe Bay Unit Spud: N/A Spud: N/A API: 50-029-21530-01-00 Release: 05/17/05 Release: 06/02/05 Permit: 197-087 Riq: Nabors 4ES Riq: Doyon 16 PRE-RIG WORK 01 /19/05 SET 3" BAKER IBP AT 10110'. PUMPED 632 BBLS CRUDE TO PACK IA AND TUBING FOR LDL. 04/05/05 DRIFTED W/ 3.65" CENT TO 10045' SLM. HAD TO WORK TOOLS THRU STA #1. RIH W/ 3.50" DUMP BAILER. 04/06/05 DUMPED 4 GALLONS OF SLUGGITS W/ 3.50" BAILER AT 10045' SLM. DUMPED 4 GALLONS OF SLUGGITS W/ 3.50" BAILER, TOTAL 8 GALLONS DUMPED. AFTER DUMPING FILL DRIFTED TO 10034' SLM. CONFIRMING 11' HIGHER THAN ORIGINAL SIT DOWN OF 10045' SLM. 04/07/05 STRING SHOT FROM 10071' - 10081', TUBING PUNCHER SHOT FROM 10030' - 10032', TUBING CUT AT 10082'. 04/08/05 SHOT STRING SHOT FROM 9734' - 9748', TUBING PUNCHER SHOT FROM 9694' - 9696', TUBING CUT AT 9746' W ITH 3 3/8" CHEM CUTTER. ,~,; BP EXPLORATION Page 1 of 16 Operations-Summary Report ~ Legal Well Name: D-26A Common Well Name: D-26A Event Name: WORKOVER Contractor Name: DOYON DRILLING INC. Rig Name: DOYON 16 Date From - To .Hours Task '~i Code I NPT _- __ ~__ 4/26/2005 18:00 - 20:00 2.00 RIGD P 20:00 - 00:00 4.00 RIGD P 4/27/2005 00:00 - 14:00 14.00 RIGD N WAIT 14:00 - 00:00 10.00 MOB N 4/28/2005 ~ 00:00 - 03:00 i 3.00 i R I G U i P 03:00 - 06:00 i 3.OOi RIGU P 06:00 - 07:00 1.00 KILL P 07:00 - 07:30 0.50 KILL P 07:30 - 08:30 1.00 KILL P 08:30 - 12:00 3.50 KILL P 12:00 - 12:30 I 0.501 KILL I P 12:30 - 13:00 0.50 WHSUR P 13:00 - 14:30 1.50 WHSUR P 14:30 - 16:30 2.00 BOPSU P 16:30 - 21:30 5.00 BOPSU P 21:30 - 22:00 I 0.501 WHSUR I P 22:00 - 23:00 1.001 PULL ~ P 23:00 - 00:00 1.001 PULL ~ P 00:00 - 02:30 2.50 ~ PULL ~ P 02:30 - 11:30 I 9.001 PULL I P 11:30 - 13:00 1.50 PULL P 13:00 - 15:00 2.00 FISH P Spud Date: 8/7/1997 Start: 4/26/2005 End: 6/2/2005 Rig Release: 6/2/2005 Rig Number: Phase ! Description of Operations PRE R/D rig. Lower & Scope down derrick. PRE Con't to R/D rig. Weigh axle loads. PRE Wait on trucks to move rig. PRE Move rig from DS 18-15b to D-26a. 14 mile move. Used 3 trucks. Moved Rig sub, pits & Camp. PRE Lay out herculite & matting boards. Spot Rig sub over well. Spot pits in. Connect lines & R/U. Raise & scope up derrick. Sent trucks for Pipe shed & camp. PRE Con't to R/U & spot in tiger tank. R/U lines to tree for kill operation. Rig accepted @ 06:00, 04-28-2005. DECOMP PJSM. Pick up lubricator, pull BPV, lay down lubricator. DECOMP Pre well safety meeting. Discussed work to be done on well, potential hazards and emphasized heightened awareness with regard to potential hazards associated with work done by (1) or (2) workers away from the rig floor. Reviewed recent incidents & near misses. DECOMP Continue taking on seawater. PT lines. Line up to kill well. DECOMP Pump heated seawater down I/A ~ 4 bpm / 50 psi. W/ 38 bbls away, still no returns up tubing. Shut down & line up to pump down tubing. Commence pumping heated seawater down tubing @ 5 bpm / 100 - 150 psi, taking returns up I/A. Still seeing diesel returns w/ 200 bbls away. W/ 400 bbls pumped seeing 50% diesel /oil, 50% water. W/ 570 bbls pumped, started taking returns, (seawater w/ light oil skim), to the pits & pumped 300 more bbls @ 5 bpm ! 100 psi, with a loss rate of approximately 2 bpm. DECOMP PJSM. Shut down & monitor well. Tbg & I/A both on a healthy vacuum. DECOMP PJSM. $et two way check valve & test @ 1000 psi, OK. DECOMP PJSM. N/D tree. DECOMP PJSM. N/U 13 5/8" x 5M BOPE. DECOMP Pressure test BOPE as per AOGCC/BP specs. LP 250 psi, HP 3500 psi. No Failures. BOP test witnessing waived by Chuck Sheve w/ AOGCC. Test witnessed by Nabors Toolpusher & Company Man. DECOMP M/U lubricator & Pull TWC. UD lubricator. Well Dead, no pressure. Fluid level below eye level. DECOMP M/U landing jt into hanger 10 1/2 turns. BOLDS. PJSM. Pull hanger to floor w/ 106K. UD hanger & landing jt. R/U Camco spooling unit. DECOMP POOH w/ 4 1/2" completion. L/D same. Pulled 20 jt. Spool up SS control lines. DECOMP Con't to POOH & UD 4 1/2" completion. Pulled & UD 65 jts. Spool up SS control lines. Recovered 5 bands & 34 clamps. R/D spooling unit. DECOMP Con't to POOH & UD 4 1/2" completion. Marked & set aside Jts # 97, 98, GLM #5 assy, & jts #228 thru 232. Laid down total of 317 jts plus 14.58' of cut off jt. Good looking cut, OD = 4.50". DECOMP PJSM. Clear clean rig floor. Rig up to run 3 1/2" DP. Strap BHA. Set wear bushing. Well stable. DECOMP PJSM. Pick up BHA #1, (overshot assembly), to fish 4 1/2" tbg. Printed: 6/6/2005 11:21:42 AM .> BP EXPLORATION Operations Summary ..Report Legal Well Name: D-26A Common Well Name: D-26A Event Name: WORKOVER Contractor Name: DOYON DRILL ING INC. Rig Name: DOYON 16 ' Date Frorn - To Task ~ Hours Code 4/29/2005 15:00 - 16:00 1.00 FISH P 16:00 - 18:00 2.00 FISH P 18:00 - 20:30 2.50 FISH P 20:30 - 00:00 3.50 FISH P 4/30/2005 00:00 - 02:00 2.00 FISH P 02:00 - 06:00 ~ 4.00 FISH ~ P 06:00 - 07:00 1.00 FISH P 07:00 - 09:00 2.00 FISH P 09:00 - 10:00 1.00 FISH P 10:00 - 11:00 1.00 FISH P 11:00 - 14:00 3.00 FISH P 14:00 - 16:00 I 2.001 FISH ~ P 16:00 - 16:30 I 0.501 FISH I P 16:30 - 20:00 I 3.501 FISH I P 20:00 - 23:00 3.00 FISH P 23:00 - 00:00 1.00 FISH P 5/1/2005 00:00 - 01:00 1.00 FISH P 01:00 - 02:00 1.00 FISH N 02:00 - 06:00 4.00 FISH N 06:00 - 11:30 5.50 FISH N 11:30-13:30 ~ 2.OO~FISH ~N Start: 4/26/2005 Rig Release: 6/2/2005 Rig Number: NPT ~ Phase Description of Operations DECOMP Wait on new set of 4 3/4" hand slips for drill collars. DECOMP P/U 3 1/2" DP 1 xi & RIH w/ BHA #1 to fish SBR. DECOMP Cut & slip 84' of drilling line. DECOMP Con't to P/U 3 1/2" DP &RIH w/ BHA #1 to fish SBR. DECOMP Con't to P/U 3 1/2" DP 1 x 1 &RIH. P/U total of 295 jts. Tagged up 25' in on Jt # 296. Total Depth @ 9714' (16' high from calculated top of 4 1/2" stub). Set down w/ 10k. P/U & had 20K overpull. POOH & drag dropped off in approx 14'. Appear to have SBR barrel. DECOMP Pump 30 bbls & prep to POOH. Lay down 2 jts & POOH & stand back 3 1/2" DP. DECOMP Continue to POOH. DECOMP PJSM. Stand back collars & UD fish. Recovered 15.26' of cut off jt, pup, GLM, pup, "X" Nipple, pup, &SBR. ID of SBR = 5.4375". Total length of fish = 65.53' DECOMP Clear /clean rig floor. DECOMP PJSM. Pick up fishing BHA #2. DECOMP RIH w/fishing BHA #2, 98 stands + (2) singles = 296 jts + 23.86' pup. DECOMP PJSM. Kelly up. Establish parameters. 148K up wt, 108K down. Bring on pump C~? 4 bpm, catch fluid after pumping 15 bbls, pump pressure 250 psi @ 4 bpm. See returns, OK. W/ 15' of kelly in C~ 9763' see pump pressure increase to 475 psi indicating over slick stick. Slack off & stack 15 - 20K on fish, bottom out w/ 6' of swallow. Pick up to 180K, allow jars to bleed off & straight pull to 225K. No release. Commence jarring; 2x @ 200K,6x @ 220K,4x C 225K,10x Q 235K & 8x @ 245K, all w/ subsequent overpulls of 20-25K over jarring wt. Straight pulls to 265K & wait 5 min each, 4x. TIW packer not releasing. DECOMP PJSM. Slack off to 155K, (5-10K over up wt), and rotate to the right (25) turns, seeing torque peak @ 9500 ft/Ibs then falling off, indicating "K" anchor type latch released on packer. Up wt 150K. DECOMP PJSM. Circulate bottoms up @ 4.5 bpm / 1000 psi. took 40 bbls to fill hole. Loss rate w/ circulating = 7 bbls every 10 minutes. DECOMP POOH w/ BHA #2. DECOMP Break out & UD BHA #2. Recovered "slick stick" & anchor ass . TL = 15.32'. DECOMP Clear & clean rig floor. Load & Tally BHA #3. DPRB DECOMP M/U BHA #3 to mill packer as follows: W/O Shoe, Ext. Top Drive, XO, 3 Junk Baskets, BS, Bumper Jar, Oil Jars, XO, 6 ' 6 1/4" Dcs, XO, XO, 10 4 3/4" Dcs. TL = 549.28'. DPRB DECOMP RIH w/ BHA #3. Tag Q 9778' DPRB DECOMP PJSM. (97 stands in the hole) Pick up kelly. Tag 13' in on kelly '. Establish parameters. 146K up wt, 108K down wt, 132K rotating wt. Off bottom torque C 80 RPM = 5000 ft/Ibs. Bring on pump C~3 5 bpm / 1000 psi. Commence milling packer w/ 5 - 10K WOB. Torque on bottom peaking out @ 9000 fUlbs. Mill f/ 9778' - 9781'. Overpulling 10 - 15K pulling off bottom. Looking like packer may be stuck up inside shoe. Pump 30 bbls Hi Vis sweep. DPRB DECOMP PJSM. CBU @ 5.5 bpm / 1100 psi. Nothing in sweep when it Page 2 of t6 Spud Date: 8/7/1997 End: 6/2/2005 Printed: 6/6/2005 11:21:42 AM BP EXPLORATION` Operations-Summary Report Legal Well Name: Common Well Name: Event Name: Contractor Name: Rig Name: ` Date From - To 5/1/2005 11:30 - 13:30 13:30 - 14:00 14:00 - 18:00 18:00 - 21:00 21:00 - 22:00 15/2/2005 ~ 5/3/2005 15/4/2005 22:00 - 00:00 00:00 - 01:30 01:30 - 02:30 D-26A D-26A WORKOVER Start: 4/26/2005 DOYON DRILLING INC. Rig Release: 6/2/2005 DOYON 16 Rig Number: Page 3 of 16 Spud Date: 8/7/1997 End: 6/2/2005 Hours I, Task Code '~ NPT Phase '~, .Description of Operations -- 2.00 FISH N DPRB DECOMP comes back over shaker. 0.50 FISH N DPRB DECOMP Shut down pump, stack 15 - 25 on fish 3x, stand back kelly. 4.00 FISH N DPRB DECOMP POOH w/ BHA #3. 3.00 FISH N DPRB DECOMP Set back 4 3/4" DCs. POOH & UD 6 1/4" Dcs. UD remainder 1.001 FISH I N 2.00 FISH N 1.50 FISH N 1.00 FISH N 02:30 - 06:00 I 3.501 FISH I N 06:00 - 08:00 2.00 FISH N 08:00 - 09:30 1.50 FISH N 09:30 - 11:30 2.00 FISH N 11:30 - 13:00 1.50 FISH N 13:00 - 16:30 3.50 FISH N 16:30 - 17:00 0.50 FISH N of BHA. Inspect shoe. Looked good, no recovery in extension . Clean out junk baskets. Recovered approx. 40# of cuttings, pipe dope & scale. Clear & clean rig floor. DPRB DECOMP M/U BHA #4 as follows to spear packer. ITCO spear, XO, Bumper jars, Oil Jars, 10` 4 3/4" Dcs, Accel. Jars, Pump Out Sub. TL = 345.67. DPRB DECOMP RIH w/ BHA #4 to spear packer. DPRB DECOMP Con't to RIH w/ Spear Assy. DPRB DECOMP P/U kelly & taa up on fish @ 9781'. Break circulation. Engage fish w/ spear. P/U 145K, S/O 111 K. Jar starting Q 175K & increased to 225K. Applied straight pull to max of 260K. Hit a total of 21 times no movement. Fluid level slowly dropping.. DPRB DECOMP Set back kelly. Blow lines. FL dropped out of sight. POOH w/ BHA #4. DPRB DECOMP Service rig. Slip & cut 84' of drilling line. DPRB DECOMP Continue to POOH. DPRB DECOMP PJSM. UD spear assembly & 4 3/4" drill collars. DPRB DECOMP PJSM. P/U packer milling BHA & 6 1/4" drill collars. DPRB DECOMP RIH w/ milling BHA on 3 1/2" DP, 97 stands, (291 jts). DPRB DECOMP PJSM. Kelly up & establish parameters. 161 K up wt, 116K down, 136K rotating wt. Rotate @ 70 - 80 RPM with 5000 fUlbs off bottom torque. Set torque limit @ 10,000 fUlbs. Bring on pump @ 4 bpm / 500 psi. Tag w/o rotating approximately 12' in 17:00 - 00:00 7.00 FISH N DPRB DECOMP Commence milling on packer w/ 5 - 10K WOB. On bottom torque running around 6500 ft/Ibs. 60-80 RPMs, 0-5 BPM @ 0-850 psi. P/U Wt = 163K, S/O Wt = 116K, Rot Wt = 132K. started Cc~ 9780', Made 18" in 7 hrs. 00:00 - 06:00 6.00 FISH N DPRB DECOMP Con't to mill on Packer. P/U Wt = 163K, S/O Wt = 116K, Rot Wt = 132k. Torq 5-8K, RPMs 60-80, BPM 0-5, Press 0-850 psi., WOB 8-18K. Mill from 9780.5 to 9781'. (Note: 9781' is with 15K WOB). Fluid losses approx 7 BPH. 06:00 - 15:30 9.50 FISH N DPRB DECOMP PJSM. Continue milling on 9 5/8" x 4 1/2" TIW HBB retrievable packer. No significant footage made in 24 hrs of milling. Explored parameters w/o success. Milling ops suspended w/ final depth 291 jts + BHA + 13' of kelly = 9779'. 30 bbls high vis sweeps pumped intermittently thoughout milling operation. Final sweep back w/ nothing significant coming across the shaker. 15:30 - 19:30 4.00 FISH N DPRB DECOMP PJSM. Stand back kelly, adjust brakes & POOH w/ 3 1/2" DP & BHA. 19:30 - 21:30 2.00 FISH N DPRB DECOMP Lay down BHA #5; Clean out junk baskets; Clear rig floor. MIII was pretty much worn out. Marks indicated into packer approximately 18" after a total of at least (24) hours on bottom milling time. 21:30 - 22:30 1.00 FISH N DPRB DECOMP M/U BHA #6 3-l14" spear with extension ;bumper sub; oil jar; drill collars; accelator jar; and circulating sub 22:30 - 00:00 1.50 FISH N DPRB DECOMP RIH BHA #6 on 3-1/2 DP 00:00 - 02:00 2.00 FISH N DPRB DECOMP RIH BHA #6 on 3-1/2" DP Printed: 6/6/2005 11:21:42 AM V 12:00 - 15:30 3.50 FISH N 15:30 - 17:00 1.50 FISH N BP'EXPLORATION Operations Summary Report Legal Well Name: D-26A Common Well Name: D-26A Event Name: WORKOVER Contractor Name: DOYON DRILLING INC Rig Name: DOYON 16 Date From - To Hours Task Code 5/4/2005 02:00 - 02:30 0.50 FISH N 02:30 - 04:30 2.00 FISH N 04:30 - 10:30 6.00 FISH N 10:30 - 12:00 1.50 FISH N 5/5/2005 5/6/2005 5/7/2005 17:00 - 21:30 4.50 FISH N 21:30 - 22:30 1.00 FISH N 22:30 - 00:00 , 1.50 FISH N 00:00 - 01:30 1.50 FISH N 01:30 - 04:30 3.00 FISH N 04:30 - 06:00 1.50 FISH N 06:00 - 16:00 I 10.001 FISH ~ N 16:00 - 00:00 ~ 8.00 FISH ~ N 00:00 - 05:30 5.50 FISH N 05:30 - 07:30 2.00 FISH N 07:30 - 09:00 1.50 FISH N 09:00 - 11:00 2.00 FISH N 11:00 - 15:30 4.50 FISH N 15:30 - 18:00 2.50 FISH N 18:00 - 22:30 ~ 4.50 ~ BOPSUFj P '<.y,y~ Start: 4/26/2005 Rig Release: 6/2/2005 Rig Number: Page 4 of 16 Spud Date: 8/7/1997 End: 6/2/2005 NPT Phase ~ Description of Operations DPRB DECOMP P/U Kelly establish paremators, engage fish at 9778', swallow 2',: Pull 250K unseat TIW packer DPRB DECOMP Circulate bottoms up DPRB DECOMP TOH with 3-1/2 DP DPRB DECOMP PJSM. Stand back collars. Recovered top 28" of packer. Packer sleeve may have shifted packer into the release position during this operation. Opt to rerun spear. Redress spear & M/U BHA. DPRB DECOMP RIH w/ 3 1/2" DP, 99 stands + (1) single. DPRB DECOMP PJSM. Kelly up & establish parameters. 159K up wt, 116K down. Bring on pump @ 4 bpm / 350 psi. See pressure increase w/ 25' of kelly in @ 9781'. Stack out on stop sub 29' in w/ 15K. Pick up to 225K & set jars. Jar a total of (50) licks, setting jars off as high as 260K, no movement. Release spear & stand back kelly. DPRB DECOMP PJSM. POOH to pick up milling BHA. DPRB DECOMP PJSM Stand back collars. Lay down BHA DPRB DECOMP M/U BHA # 8; Packer Mill, Boot Baskets, Bit Sub, Bumper Sub, Oil Jar, 4-1/2 Drill Collars, 3-1/2 Drill Collars, & Circulating Sub DPRB DECOMP Continue making up BHA # 8 DPRB DECOMP PJSM RIH BHA # 8 on 3-1/2" DP, 94 stands & (1) 10' pup, DPRB DECOMP Kelly up & establish parameters, 175K up wt, 125K down wt, 145K rotating wt. 80 RPMs w/ 7000-8000 fUlbs torque oft bottom. Pumping 3.5 bpm @ 600 psi. Tagged packer 20' in on kelly @ 9777' DPM while rotating. Start milling on packer w/ 15K WOB. Call drv taa w/o rotatina @ 9779'. DPRB DECOMP PJSM. Torque on bottom while milling is 10,000 fUlbs, right on the stall point. Add (2) bbls EP mud tube to the system. Continue with milling operation. On bottom torque dropped to 7000 fUlbs after EP mud Lube around. Milled w/ 35-45K WOB. Occasional spuds on packer w/ bumper jars. Made 1' in 1st 3 hrs. After that, not much more in the next 6 hrs, maybe 1 ". Pumped 15 bbl viscosified brine pill w/ 5 sx coarse nut plug & spotted on bottom. Spudded out & milled on same. DPRB DECOMP Continue milling operation w/ 35-50K WOB Spudding in intervals pumping EP mude tube 3 bbl/min 500 psi. No hole made. Torgue 3-7000 fUlbs. Working varible weights and speed. DPRB DECOMP Milling operation with 8-1/2" packer mill. Torque at 3-7000 fUlbs. No hole made. DPRB DECOMP Continue milling w/ sweep goes around. Suspend milling ops when sweep back. No significant cuttings over shaker. DPRB DECOMP PJSM. Stand back kelly. POOH w/ 3 1!2" DP & milling BHA. DPRB DECOMP Conduct BOP Drill, witnessed by Nabors Tool Pusher & BP Company Man. Slip & cut 84' of drilliing line. DPRB DECOMP POOH w/ 3 1/2" DP. DPRB DECOMP PJSM. Stand back collars. UD milling BHA. Mill worn down in 1 1/2" circumference around stinger. Prep for BOPE test. DECOMP BOPE Fully Tested 250 psi low and 3500 psi high as per AOGCC/BP s ecswWitnessing waved by John Crisp with AOGCC. Test witnessed by Tool Pusher and Company Rep. 22:30 - 00:00 1.50 FISH P DECOMP Pull test Plug -Insert wear bushing, Clean junk baskets 00:00 - 04:00 4.00 FISH N DPRB DECOMP R/U Otis Ext. Safety Meeting held with Schlumberger, Nabors, Printed: 6/6/2005 11:21:42 AM P BP EXPLORATION Page 5 of 16 Operations Summary Report Legal Well Name: D-26A Common W ell Name: D-26A Spud Date: 8/7/1997 Event Nam e: WORKO VER Start : 4/26/2005 End: 6/2/2005 Contractor Name: DOYON DRILLIN G INC . Rig Release: 6/2/2005 Rig Name: DOYON 16 Rig Number: Date_ From - To ~ Hours ' Task Code I , NPT Phase Description of Operations 5/7!2005 00:00 - 04:00 4.00 FISH N DPRB DECOMP and Co. Rep. PJSM for R/U using explosives. R/U Schulumberger with 15' tool string and 7 stand string shot configure with 2.30" bull nose to help entry into packer. RIH and attempt enter packer tagged at 9778' WLM but not able to get thru. POOH. Tools not bent badly found dent marks center of bull nose. 04:00 - 07:00 3.00 FISH N DPRB DECOMP Dress string shot and lower bull nose extension. RIH, still unable to get thru packer. 07:00 - 10:00 3.00 FISH N DPRB DECOMP RIH w/ centralized bullnose, weight bars, unable to get thru packer. POOH. R/D E-Line. 10:00 - 11:30 1.50 FISH N DPRB DECOMP PJSM. M/U muleshoed 3 1/2" EUE 8 rnd pup, x/o, x/o, bumper sub, oil jars, x/o, (9) 6 1/4" DCs, x/o, x/o, & (9) 4 3/4" DCs. 11:30 - 14:30 3.00 FISH N DPRB DECOMP RIH w/ muleshoe BHA on 3 1/2" DP. 96 stands & (1) single. 14:30 - 15:00 0.50 FISH N DPRB DECOMP PJSM. Tag top of packer 25' in @ 9780'. Pick up & rotate pipe. Bring on pump @ 4 bpm / 850 psi. Slack off & enter packer, OK. RIH till 8 rnd bottoms out @ 9800', seeing corresponding pump pressure increase. 15:00 - 16:00 1.00 FISH N DPRB DECOMP PJSM. Reverse circulate @ 3 bpm / 650 psi, 1 1/2 DP volumes. No fluid lost, nothing back @ btms up. Break off circ head & leave 96 stands & single in hole. Shoe @ 9785'. 16:00 - 18:00 2.00 FISH N DPRB DECOMP PJSM. Rig up Schlumberger E Line to RIH w/ 1 11/16" tool string to 18:00 - 21:30 3.50 FISH N DPRB DECOMP On depth with W/L establish parameters of 4-1/2" tbg below fish and BHA above fish. Drop down below fish and pick up DP 30' out of packer fish. Log up to top of packer fish and drop back down. Log up and place 7 strand shot accross top section of fish 9776' WLM. Fire off 7 strand shot. POOH & R/D W/L Fill hole 18 bbls 21:30 - 00:00 2.50 FISH N DPRB DECOMP POOH with 3-1/2" DP. 5/8/2005 00:00 - 01:00 1.00 FISH N DPRB DECOMP POH with 3-1/2" DP 01:00 - 02:00 1.00 FISH N DPRB DECOMP Stand back Drill Collars, Lay down BHA #9 02:00 - 05:00 3.00 FISH N DPRB DECOMP P/U BHA #10; Packer Mill, Boot Baskets x 6, Bit Sub, Bumper Sub, Oil Jar, 4-1/2" DC x 15, 31/2" DC x 10, Circulation Sub. 05:00 - 06:00 1.00 FISH N DPRB DECOMP TIH BHA #10 on 3-1/2" DP 06:00 - 08:00 2.00 FISH N DPRB DECOMP Continue in hole. 94 stands & (1) 10' pup = 9758' DPM. 08:00 - 18:00 10.00 FISH N DPRB DECOMP PJSM. Kelly up & establish parameters. 155K up wt, 125K down wt, 145K rotating wt. 3500 fVlbs torque off bottom. Tag packer 20' in w/ rotating @ 9778'. Commence milling on packer @ 105 RPM, 4500 - 5000 ft/Ibs torque on bottom pumping 3 bpm @ 425 psi. Start out running 7 - 10K WOB, slowly increasing wt to 35 - 40K WOB. Begin making hole after approximately (2) hrs milling. Made approximately 3' by 17:00 hrs. 18:00 - 22:30 4.50 FISH N DPRB DECOMP Mill on packer 80 / 100 RPM w! 25-35K weight down pumping 4 bpm @ 400 psi; Made approximately 1', Mix 40 bbl Hi-Vis and pump around, no recovery of cuttings 22:30 - 00:00 1.50 FISH N DPRB DECOMP Had indication of increase of pressure, (at packer rubbers), and torque indicating we have milled the packer to depth of 9783'. Stop milling shut pumps down monitor well, well stable. POOH 3-1/2" DP 5/9/2005 00:00 - 03:00 3.00 FISH N DPRB DECOMP POH with 3-1/2" DP 03:00 - 06:00 3.00 FISH N DPRB DECOMP Stand back drill collars; Lay down BHA #10 Clean Boot baskets, Clean rig floor Printed: 6/6/2005 11:21:42 AM BP EXPLORATION Page 6 of 16 Operations Summary Report Legal Well Name: D-26A Common Well Name: D-26A Spud Date: 8/7/1997 Event Name: WORKOVER Start: 4/26/2005 End: 6/2/2005 Contractor Name: DOYON DRILLING INC. Rig Release: 6/2/2005 Rig Name: DOYON 16 Rig Number: Date From - To i ,Hours Task Code NPT Phase ' Description of Operations -- _~_ - _ - --_ ~i --- _ _ _ _ _ _ - 5/9/2005 06:00 - 08:00 2.00 FISH N DPRB DECOMP RIH w/fishing assembly on 3 1/2" DP. 08:00 - 09:30 1.50 FISH N DPRB DECOMP PJSM. Slip & cut 84' of drillirig line. 09:30 - 11:00 1.50 FISH N DPRB DECOMP Continue to RIH w/fishing assembly on 3 1/2" DP. 99 stands & (1) single + BHA = 9755' DPM. 11:00 - 11:30 0.50 FISH N DPRB DECOMP PJSM. Kelly up & establish parameters. 143K up wt, 122K down. Bring on pump @ 3 bpm / 475 psi. Slack off & see top of acker 30' in on kelly @ 9785'. 32' in, (spear located out in packer), stack 15K. Pump pressure increased to 650 psi @ 3 bpm. Pick up (1) time to 185 & see wt break over to 147K up wt. Pull up 20' or so & slack off, start taking wt after slacking off 10' or so, good indication of fish on. Pump pressure still 650 psi @ 3 bpm. 11:30 - 13:00 1.50 FISH N DPRB DECOMP PJSM. CBU @ 5 1/2 bpm 13:00 - 17:00 4.00 FISH N DPRB DECOMP PJSM. Stand back kelly & POOH, (slowly), as packer is hanging up a bit. 17:00 - 20:00 3.00 FISH N DPRB DECOMP PJSM. UD BHA. Recovered 1.75' of packer & ' of 261.53' 4 1/2" tbg. Cut was split, needs dressing off. Cut is @ 048.60'. Cuttings recovered from Tbg 40 gals 20:00 - 21:30 1.50 FISH N DPRB DECOMP Clean Rig Floor 21:30 - 23:30 2.00 FISH P DECOMP Make up BHA # 11 Shoe, washpipe extension, Drive sub, Boot baskets, Bit sub, Bumper sub, Oil jar, Drill collars x 5 Casing scraper, Drill collars x 4, Circulating sub 23:30 - 00:00 0.50 FISH P DECOMP TIH w/ 3-1/2" DP 5/10/2005 00:00 - 06:00 6.00 FISH P DECOMP TIH with 3-1/2 DP, Tagged up at liner 9859', worked through, wash down to tubing stub. Some overpulling early on, junk / rubber getting up around mill. 06:00 - 07:00 1.00 FISH P DECOMP Kellied up & tag tubing stub. 102 stands + BHA, (333.24') + 31.5' in on kelly = 10~, 056' DP.M. Establish parameters. 136K up wt, 117K down wt, 126K rotating wt. 3 1/2 bpm @ 600 psi. Swallow stub, (10' swallow), & mill /dress off sub w/ 3 -5K WOB. 3500 fUlbs torque. 07:00 - 10:00 3.00 FISH P DECOMP PJSM. Pick up 5'. Reverse circulate 30 bbls HI Vis sweep around @ 5 bpm / 1450 psi. Losing 3 -4 bbls every 10 min. Half way thru drop down to 1' from being located out on stub. Nothing significant back over shaker. 10:00 - 11:30 1.50 FISH P DECOMP PJSM. Stand back kelly. POOH. See significant overpull w/ bit @ 9980', 60K - 80K over. Stacking out going down. Work pipe, acts like metal, set jars off (1) time to verify below jars. Worked u & thru liner, OK. 11:30 - 14:00 2.50 FISH P DECOMP Continue OOH. 14:00 - 15:00 1.00 FISH P DECOMP UD BHA, recovered slip carrier of TIW Packer that was stuck on end of shoe. Shoe and boot baskets where damaged 15:00 - 16:00 1.00 FISH P DECOMP Clean boot baskets and inspect mills. Inspection shows stump not dressed. 16:00 - 16:30 0.50 FISH P DECOMP PJSM Halliburton; Make Up 9-5/8" RTTS packer with mule hoe 16:30 - 21:30 5.00 FISH P DECOMP TIH with 9-5/8 RTTS on 3-1/2" DP. 100 Stds in, Wieght 131 K up 115K slack. Soft tag liner top at 9857'. P/U and circulate. Work pipe up and dowm 15' 21:30 - 23:00 1.50 FISH P DECOMP Set RTTS at 9850' Close rams and test 9-5/8" Cs 3500 si for 30 min. Test Good & Charted /Unseat packer 23:00 - 00:00 1.00 FISH P DECOMP POOH with 9-5/8" RTTS on 3-1/2" DP 5/11/2005 00:00 - 03:00 3.00 FISH P DECOMP TOH with 9-5/8" RTTS on 3-1/2" DP Printetl: 6/6/2005 11:21:42 AM BP EXPLORATION Page, 7 of 16 Operations Summary Report Legal Wefl Name: D-26A Common Well Name: D-26A Event Name: WORKOVER Contractor Name: DOYON DRILLING INC. Rig Name: DOYON 16 Date From - To Hours Task Code ~~! NPT _. __ _ ~__ 5/11/2005 03:00 - 04:00 1.00 FISH P 04:00 - 04:30 0.50 FISH P 04:30 - 06:00 1.50 CLEAN P 06:00 - 06:30 0.50 CLEAN P 06:30 - 09:30 3.00 CLEAN P 09:30 - 10:00 ~ 0.50 ~ CLEAN ~ P 10:00 - 11:00 ~ 1.00 CLEAN ~ P 11:00 - 12:00 ~ 1.00 ~ CLEAN ~ P 12:00 - 15:00 3.00 CLEAN P 15:00 - 15:30 0.50 CLEAN P 15:30 - 16:00 0.50 CLEAN P 16:00 - 20:00 4.00 CLEAN P 20:00 - 00:00 4.00 CLEAN P 5/12/2005 00:00 - 03:00 3.00 CLEAN P 03:00 - 04:00 1.00 CLEAN P 04:00 - 04:30 ~ 0.50 ~ CLEAN ~ P 04:30 - 08:00 3.50 CLEAN P 08:00 - 09:30 1.50 CLEAN P 09:30 - 10:00 0.50 CLEAN P 10:00 - 12:00 2.00 CLEAN P 12:00 - 13:00 1.00 CLEAN P 13:00 - 14:30 1.50 CLEAN P 14:30 - 15:00 0.50 CLEAN P Spud Date: 8/7/1997 Start: 4/26/2005 End: 6/2/2005 Rig Release: 6/2/2005 Rig Number: Phase Description of Operations DECOMP S/B Collars B/O & UD RTTS DECOMP Clean Rig Floor DECOMP M/U BHA as follows: 3 3/4" Shoe, Drive Sub, Double Pin Sub, Guide Extension Shear Pin Assy, 4 Jts 2 7/8" Drill Pipe, XO, Bumper Sub, Oil Jar, 9 ea 4 3/4" drill Collars, Pump out Sub. DECOMP Lub Rig. DECOMP TIH with BHA #13 and 3 1/2" Drill Pipe to 9,863' (4 ft inside TOL). DECOMP Reverse Circulate at 5.9 bpm/1200 psi x 2 DPVs. Recovered 1 piece of Packer rubber. DECOMP Continue TIHto 10,048'. Set down on top of 4 1/2" Stump. Shear pins on Guide Extension and allow 3 3/4" Shoe to enter Stump. Got inside and attempted to wash down. However, unable to make any progress. DECOMP Pick-up Kelly. Wash and rotate (pushing junk down hole) to 10 053'. Unable to make an further ro ress. DECOMP Set back Kelly. POOH with drill Pipe and BHA #13. DECOMP Lay down Guide Extension. Lay down 3 3/4" Shoe. Shoe was- "bald" and was groved from spinning on junk. DECOMP Make-up a 3.70 5-Blade Junk Mill. Re-pin Guide Extension DECOMP TIH with BHA #14 and Drill Pipe. ~j~..t" DECOMP P/U Kelly 137K up / 119K down Tag and ilstump @ 10.048' MD shear extension gide and tag fill Q 10,053' fast mill to 10,055', hard mill to 10,057' and broke free. Washed to 10 062'. P/U and hung up a little at 10,048' pull free Break and add jt. to Kelly Try to inter 4-1/2" not able to. Break out jt from Kelly slack and rotate back in 4-1/2" tag up Co3 10,053' Mill to 10,058' not as hard this time. P/U to 10,053', slack 10K down and no movement. Junk is running with us! Possible to recover and or see where wear is on tools. Decide POOH and see. DECOMP PJSM TOH with 3-1/2" DP DECOMP S/B Collars UD BHA. Found mill worn to last inch by packer slips, (gill marks) DECOMP Make up BHA #15 as follows 3-3/4" Mill, Shear pin assembly, 4 x 2-7/8" drill pipe, X/O, Bumper sub, Oil jar, 9 x 3-1/2 DC, Circulation sub DECOMP TIH with BHA #15 on 3-1/2 DP. Stop at 10,026'. DECOMP Pick-up Kelly. POW = 137K. SOW = 118K. PR = 2 bpm/250 psi. Set on toe of 4 1/2" Stump at 10,048' and shear pins in Guide Extension. Enter 4 1/2" Stump. Continue to top of Junk at 10,053'. Rotate/Wash Junk down to 10,063'. PUH...Junk follows. Begin again at 10,053'. R/W back to 10,063'. Continue to mill on Junk at 10,063'. Work Mill up/down. Junk gone. Stop R/W. Continue down to 10,114' (top of IBP)...with no problems. PUH to -10,053' and back to 10,114' with no problems. DECOMP Set down on top of IBP. Pump ~ 75 bbls at 5.0 bpm/1,400 psi. DECOMP Monitor Well. Set back Kelly. TOH to --6,500'. stop to cut and Slip Drilling Line. DECOMP Cut and Slip Drilling Line. DECOMP Finish TOH with 3 1/2" Drill Pipe and BHA #15. DECOMP Lay down 3 3/4" MITI. Lay down Guide Extension. Mill warn and groved. rnnrea: ~iroizouo 11:Y1:4L HM `,~ ~~ BP EXPLORATION ' Operations Summary Report Legal Well Name: D-26A Common Well Name: D-26A Event Name: WORKOVER Contractor Name: DOYON DRILLING INC. Rig Name: DOYON 16 i ' Date .From - To ,Hours Task 'Code NPT 5/12/2005 15:00 - 15:30 0.50 CLEAN P 15:30 - 19:00 3.50 CLEAN P 19:00 - 20:00 1.00 CLEAN P 20:00 - 21:30 1.50 CLEAN P 21:30 - 00:00 2.50 CLEAN P 5/13/2005 00:00 - 02:00 2.00 CLEAN 02:00 - 02:30 0.50 CLEAN 02:30 - 03:00 0.50 CLEAN 03:00 - 06:30 3.50 CLEAN 06:30 - 07:30 1.00 CLEAN 07:30 - 10:00 2.50) CLEAN 10:00 - 13:30 13:30 - 14:00 3.50 CLEAN 0.50 CLEAN Page 8 of_16 ~ Spud Date: 8/7/1997 Start: 4/26/2005 End: 6/2/2005 Rig Release: 6/2/2005 Rig Number: Phase Description of Operations DECOMP Make up BHA # 16 as follows IBP Retrieving Tool, Shear Pin Assembly, 4 x Jts 2-7/8" DP, Bumper Sub, Oil jar, 9 x Drill collars, Circulation sub. DECOMP TIH w/ 306 Jts of 3-1/2" DP tag at 10,110'. DECOMP M/U Circ. hose Rev Circ. 3/5 bpm at 500! 1400 psi 209 bbls had no recovery of debree DECOMP Break out Jt M/U Kelly Rotate and wash to 10,114' Not able to latch IBP S/B Kell DECOMP POH w / 3-1/2" DP DECOMP POH w/ 3-1/2" DP DECOMP Lay down BHA # 16 Bottom of IBP Retrieving tool had marks of debree DECOMP M/U BHA # 17 as follows Rev. Circ Jet basket, Shear pin assembly, 4 Jts 2-7/8" DP, Bumper sub, Oil jar, 9 Drill collars, Circulating sub DECOMP TIH with BHA #17 and 3 1/2" Drill Pipe. DECOMP Pick-up Kelly. Wash/Ream with Reverse Circulating Jet Basket from top of 4'1/2" Stump down to 10,114'. Started to make hole. Continue down to 10,122'. No further progress. DECOMP Circulate bottoms up at 5.0 bpb/2,100 psi. PU to 10, 045 and Wash/ream back to 10,122'. DECOMP Set back Kelly. TOH with BHA #17 and 3 1/2" Drill Pipe. DECOMP Lay down Guide Extension and Jet Basket. Clean Jet Basket. Basket full of manaled uD pieces of metal from_m~fled uo 14:00 - 14:30 0.50 CLEAN DECOMP Make-up Jet Basket for second run. Make-up Guide Extension and install shear pins. 14:30 - 17:00 2.50 CLEAN DECOMP TIH with BHA #17 (re-run) and 3 1/2" Drill Pipe. 17:00 - 18:00 1.00 CLEAN DECOMP M/U Kelly P/U 137K S/O 116K Wash /Ream from top 4-1/2" ~~~~15 Stump to iQ~i'228' ;With indication we are pushing something downhole; POH pulling 155K swabbing hole up to Stump. 18:00 - 22:30 4.50 CLEAN DECOMP POH w/ 3-1/2" DP not making any turns in pipe guessing IBP may be stuck on bottom of tools 22:30 - 23:00 0.50 CLEAN DECOMP S/B Collars lay down BHA. Clean Jet Basket, Recovered feces of metal from miled Packer, but not full. 23:00 - 00:00 1.00 CLEAN DECOMP Clear Floor for BOP Test 5/14/2005 00:00 - 04:30 4.50 BOPSU P DECOMP ressure Test BOPE as er AOGCC/BP specs. LP 250 psi HP 3500 psi. No Failure. Witnessing of test was waved by Jeff Jones with AOGCC. 04:30 - 05:30 1.00 BOPSU P DECOMP Blow down lines. Rig down test equipment. 05:30 - 06:00 0.50 FISH P DECOMP Make-up BHA #18 as follows: IBP Retrieving Tool, XO, Shear Pin Assy, 4 ea 2 7/8" Drill Collars, XO, Bumper Sub, Oil Jar, 9 ea 4 3/4" drill Collars, Pump-Out Sub. 06:00 - 09:00 3.00 FISH P DECOMP TIH with BHA #18 and 3 1/2" Drill Pipe to 10,028'. 09:00 - 10:00 1.00 FISH P DECOMP Pick-up Kelly. POW = 137K. SOW = 118K. RTW = 128K. PR = 3 bpm/450 psi. inter top of 4 1!2" Stump at 10,04$'. Hit obstruction at 10,053'. Work to get through with no-joy. 10:00 - 13:00 3.00 FISH P DECOMP TOH with 3 1/2" drill Pipe and BHA #18. 13:00 - 13:30 0.50 FISH P DECOMP Lay down IBP Retrieving Tool and Guide Extention. Marks on Retrieving Tool indicates pieces of Junk still in 4 1/2" tubing on top of IBP. 13:30 - 14:00 0.50 CLEAN P DECOMP Make-up BHA #19 as follows: Rev Circ Jet Basket, Shear Pin Assembly, 4 ea Jts 2 7/8" Drill Pipe, XO, Bumper Sub, Oil Jar, Printed: 6/6/2005 11:21:42 AM ~; ~; BP EXPLORATION Page 9 of t6 Operations Summary Report Legal Well Name: D-26A Common W ell Name: D-26A Spud Date: 8/7/1997 Event Nam e: WORKO VER Start : 4/26/2005 End: 6/2/2005 Contractor Name: DOYON DRILLIN G INC . Rig Release: 6/2/2005 Rig Name: DOYON 16 Rig Number: Date From - To Hours ''~ ---i Task I Code ' - __ 's NPT -- I Phase -__ _ ~ Description of Operations _ _-- 5/14/2005 13:30 - 14:00 0.50 CLEAN P DECOMP 9 ea 4 3/4" Drill Collars, Pump-Out Sub. 14:00 - 17:00 3.00 CLEAN P DECOMP TIH with BHA #19 and 3 1/2" Drill Pipe to 10,028' 17:00 - 20:30 3.50 CLEAN P DECOMP P/U Kelly Parameters set POW = 137K. SOW = 117K. RTW = 128K. Enter top of 4-1/2' at 10,048' Hit obstruction at 10,053'. Rotate and reverse wash through .Short trip and tag again at 10,053'. Rotate and reverse wash through again. Short trip and tag again at 10,053'. 20:30 - 23:00 2.50 CLEAN P DECOMP TOH with 3-1/2" drill pipe and BHA #19 23:00 - 00:00 1.00 CLEAN P DECOMP Lay down Rev circ Jet basket recovered 4 pieces on funk, looks like chucks of Tb . 5/15/2005 00:00 - 00:30 0.50 CLEAN P DECOMP Lay Down BHA # 19 00:30 - 01:30 1.00 CLEAN P DECOMP Clean Rig Floor 01:30 - 03:00 1.50 CLEAN P DECOMP Make up BHA #20 as follows; Shoe, Washpipe, Drive sub, Boot baskets (2), Bit sub, Bumper sub, Jar, Drill collars (6), Csg. scrapper (9-5/8"), Bit sub, Drill collars (3), Circulating sub. 03:00 - 05:00 2.00 FISH P DECOMP TIH with BHA # 20 on 3-1/2" drill pipe 05:00 - 07:00 2.00 FISH P DECOMP Pick-up Kelly. Tag and swallow 4 1/2" Stump (11-ft). Dress off to of 4 1/2" Tubin Stum 2-ft at 10 048' d w 07:00 - 10:00 3.00 FISH P DECOMP Mix and reverse in a 25 bbl Hi-Vis Sweep. Reverse sweep back to surface at 5 bpm/1450 psi. Saw nothing significant in returns. 10:00 - 14:00 4.00 FISH P DECOMP TOH with 3 1/2" Drill Pipe and BHA # 20. 14:00 - 14:30 0.50 FISH P DECOMP Lay down BHA #20. Dressing Mill had good clean pattern on face, indicating that 4 1/2" Tubing was dressed. The face on the Pilot Mill showed a piece of junk still inside Tubing. Empty Junk Baskets. Recovered -1 gal of mill shavings and a few small pieces of milled-up Packer. 14:30 - 15:00 0.50 CLEAN P DECOMP Make-up BHA #21 as follows: Rev Cir Jet Basket, Spear Pin Assy, 4 Jts 2 7/8" Drill Pipe, XO Sub, Bumper Sub, Oil Jar, 9 Drill Collars, Pump-Out Sub. 15:00 - 17:30 2.50 CLEAN P DECOMP TIH with BHA #21 and 3 1/2" Drill Pipe. 17:30 - 19:00 1.50 CLEAN P DECOMP Ta to of Stum at 10,050' Wash with Reverse Circ Basket to . No obstructions found going in or coming out of 4-1/2" Tbg. 19:00 - 22:00 3.00 CLEAN P DECOMP TOH with 3-1/2" Drill Pipe and BHA #21 22:00 - 23:00 1.00 CLEAN P DECOMP Lay down BHA #21 Recovered one chuck of junk 23:00 - 23:30 0.50 CLEAN P DECOMP Clear and clean rig floor 23:30 - 00:00 0.50 CLEAN P DECOMP Make up BHA #22 as follows. IBP retrieving tool, Shear pin assembly, 2-7/8" Dri)I Pipe (4jts), Bumper sub, Jar, 4-3/4" Drill collars (9), Circulating sub 5/16/2005 00:00 - 00:30 0.50 FISH P DECOMP Make up BHA as fdollows IBP Retrieving tool, Shear pin assembly, 2-7/8" Drill pipe (4jts), Bumper sub, Jar, Drill collars (9), Circulating sub 00:30 - 03:30 3.00 FISH P DECOMP TIH BHA #22 on 3-1/2" Drill pipe 03:30 - 09:00 5.50 FISH P DECOMP P/U Kelly POW = 137K SOW = 117K PR = 4 BPM 400psi lack off and to u at 10 128' /Not latchin IBP. Continue to circulate and work tools in an attempt to latch IBP...no-joy. Discuss plan forward with Town. 09:00 - 14:00 5.00 FISH P DECOMP POOH with 3 1/2" Drill Pipe and BHA #22. Stand back 29 Stds of Drill Pipe in Derrick. Single down remaining Drill Pipe in Pipe shed. Stand back 3 Stds of Drill Collars. 14:00 - 15:00 1.00 FISH P DECOMP Lay down remaining BHA #22. However, the Shear-Pin Guide Assembly was left in hole over the 4 1/2" Stump due to BHA Printed: 6/6/2005 11:21:42 AM ~..d' BP EXPLORATION Page 10 of 16 Operations Summary Report Legal Well Name: D-26A Common Well Name: D-26A Spud Date: 8/7/1997 Event Name: WORKOVER Start: 4/26/2005 End: 6/2/2005 Contractor Name: DOYON DRILLING INC. Rig Release: 6/2/2005 Rig Name: DOYON 16 Rig Number: Date From - To ~ Hours Task Code ! NPT I Phase ''~, Description of Operations i 5/16/2005 14:00 - 15:00 1.00 FISH P DECOMP wear. Pull Wear Bushing. Clear and clean Floor. 15:00 - 16:00 1.00 TA P SURE ~ PJSM with Halliburton Nabors and Co. rep. Pick-up Halco 9 5/8" RBP. 16:00 - 17:00 1.00 TA P SURE TIH 9-5/8" RBP on 3-1/2" Drill pipe. 17:00 - 18:00 1.00 TA P SURE On depth PUW = 58K SOW = 20 K /Set 9-5/8" RBP at 3035' Test for 15 min at 1500 psi 18:00 - 19:30 1.50 TA P SURE Cut and slip dull line 19:30 - 00:00 4.50 TA P SURE TOH and lay down Drill pie 5/17/2005 00:00 - 00:30 0.50 TA P SURE PJSM with all hands and Co-Rep 00:30 - 02:30 2.00 TA P SURE P/U and run 4-1/2" 12.6 Ib/ft L-80 NSCT TbgKill Strina for T/A with end Tbg at 2522' with 3.813 X Nipple at 2509' 02:30 - 04:00 1.50 TA P SURE P/U Landing Jt. and Hanger Drain stack POW = 35K SOW = 35K R/D Tbg. Equip. Land Hanger. RILDS Test Set TWC 04:00 - 05:30 1.50 TA P SURE N/D BOPE 05:30 - 08:00 2.50 TA P SURE Nipple-up Adaptor flange and Production Tree. Test at 5,000 psi. Good. 08:00 - 09:00 1.00 TA P SURE Pick-up Lubricator and pull TWC. Lay down same. 09:00 - 12:00 3.00 TA P SURE Rig-up Lil' Red and reverse in with 150 bbls Diesel to Freeze Protect Well. AIIow Well to U-Tube. Blow down Lines. Rig-down Lil' Red. 12:00 - 13:00 1.00 TA P SURE Install BPV and Test. Secure tree and cellar. Release Riq at 13:00 hrs. '.5/24/2005 18:00 - 18:30 0.50 MOB P PRE PJSM-Move Rig off B-23A and position on location to L/D derrick and install Booster Wheels ~I 18:30 - 19:30 1.00 MOB P PRE PJSM-Perform Derrick Inspection Prior to Laying Over, UD Derrick 19:30 - 20:30 1.00 MOB P PRE PJSM-Remove BOPE from Cellar and Install on Transfer Cradle 20:30 - 21:00 0.50 MOB P PRE Install Rear Booster Wheels 21:00 - 00:00 3.00 MOB P PRE PJSM-Move Rig from B-Pad to D-Pad '...5/25/2005 00:00 - 02:00 2.00 MOB P PRE Move Riq to D-26A 02:00 - 02:30 0.50 MOB P PRE PJSM-Remove Booster Wheels 02:30 - 03:30 1.00 MOB P PRE PJSM-Inspect, Prep and Raise Derrick 03:30 - 04:00 0.50 MOB P PRE Install BOPE's on Cellar Pedistal 04:00 - 04:30 0.50 MOB P PRE Lay Herculite and Mats Around Cellar 04:30 - 05:30 1.00 MOB P PRE Move Rig Over D-26A, Level, Shim and Spot Rig. 05:30 - 07:00 1.50 MOB P PRE Installed Secondary Annulus Valve, Rigged Up Floor, M / U Blocks to Top Drive, Spotted Slop Tank. 07:00 - 09:00 2.00 CLEAN P DECOMP Took on Seawater, R / U Lines to 9-5/8" x 4-1/2" Annulus. Circulated System, Checked for Leaks. Accepted Rig at 0700 ~i hrs 5 / 25 / 2005. ~I 09:00 - 10:00 1.00 WHSUR P DECOMP Held PJSM. R / U DSM Lubricator, Latched and Pulled BPV, R / D DSM. Tubing Pressure 0 psi, Annulus Pressure 0 psi. ~ 10:00 - 11:00 1.00 CLEAN P DECOMP R / U to Tree w/ Lines. Displaced Diesel from Wellbore w/ Clean 8.5 ppg Seawater. Pump Rate 8 bpm, 500 psi. Pumped ~I 300 bbls. Monitored Well, Static, Blew Down Lines. 11:00 - 11:30 0.50 WHSUR P DECOMP R / U T-Bar, Ran and Set TWC. Tested TWC from Below to 1,000 si, OK. 11:30 - 12:30 1.00 WHSUR P DECOMP Held PJSM. N / D Tree and Adapter Flange. ~I 12:30 - 15:30 3.00 BOPSU P DECOMP N / U BOPE: 13-5l8" 5M GK Annular Preventer, 13-5l8" 5M ', Blind Shear Rams, Mud Cross w/ Kill Choke Lines, 13-5/8" Lower Pipe Rams with 3-1/2" x 6" Variable Rams. N / U Riser. Installed Flow Line. Printetl: 6/6/2005 11:21:42 AM BP EXPLORATION Page 11 of 16- Operations Summary Report Legal Well Name: D-26A Common Well Name: D-26A Event Name: WORKOVER Contractor Name: DOYON DRILLING INC. Rig Name: DOYON 16 Task Code NPT Date From - To !Hours it 15:30 - 16:00 ~ 0.50 ~ BOPSUF~ P 16:00 - 21:00 ~ 5.00 ~ BOPSUF~ P 21:00 - 21:30 0.50 BOPSU P 21:30 - 22:30 1.00 BOPSU P 22:30 - 23:00 0.50 PULL P 23:00 - 23:30 0.50 PULL P 23:30 - 00:00 0.50 PULL P 5/26/2005 00:00 - 03:00 3.00 PULL P 03:00 - 04:00 I 1.001 BOPSUF~ P 04:00 - 04:30 0.50 CLEAN P 04:30 - 06:00 1.50 CLEAN P 06:00 - 08:30 2.50 CLEAN P 08:30 - 09:00 0.50 CLEAN P 09:00 - 09:30 I 0.501 DHB I P 09:30 - 11:00 1.50 DHB P 11:00 - 11:30 0.50 DHB P 11:30-12:30 ~ 1.00~FISH ~P 12:30 - 13:30 1.00 FISH P 13:30 - 17:30 4.00 FISH P 17:30 - 18:30 1.00 FISH P 18:30 - 22:00 3.50 FISH P 22:00 - 00:00 ' 2.00 FISH P Spud Date: 8/7/1997 Start: 4/26/2005 End: 6/2/2005 Rig Release: 6/2/2005 Rig Number: Phase Description of Operations DECOMP M / U Test Joint w/ XO. RIH and M / U to Tbg Hanger. R / U BOPE Test Equipment. DECOMP Held PJSM. Tested BOPE. Tested Annular Preventer, Blind Rams, Choke Manifold and Valves, HCR's, Kill Line, Choke Line, Floor Valves and IBOPs to 3,500 psi High / 250 psi Low. All Tests Held f/ 5 Min. All Pressure Tests Held w/ No Leaks or Pressure Loss. AOGCC Rep. Chuck Scheve Waived Witness of Test. Test Witnessed by BP Drilling Supervisor. DECOMP R/D BOPE Test Equipment, B/O and UD Test Joint DECOMP R/U DSM Lubricator and Pull TWC, R/D Lubricator, Monitor Well-Static DECOMP PJSM-Change Out Bails and R/U Tubing Tongs DECOMP M/U TCII XO to Ldg. Jt. RIH with Ldg. Jt. and Engage Tubing Hgr. BOLDS, Pull Hanger to Rig Floor with 75,000# Up Weight DECOMP B/O and UO XO, Ldg. Jt. and Hanger DECOMP POH w/ 4.5# L-80 NSCT Kill String. Recovered Tubing Hanger, 60 Tubing Jts, 4 XO Pup Jts., 1 "X" Nipple and 1 WLEG. DECOMP Install Test Plug and Test Lower Pipe Rams to 250 psi low/ .3,500 high. Hold Tests for 5 min. Each. Remove test Plug. Install Wear Ring (ID = 8.75"). L/D Running Tool DECOMP Clear and Clean Floor. UD All Excess Tubing Handling Equipment DECOMP PJSM-M/U 9-5/8" RBP Retrieving BHA: Retrieving Tool - XO - 12 x 4-3/4" DC's DECOMP RIH w/ RBP Retrieving BHA on 4" DP to 3,046'. P / U 4" DP 1 x 1 from Pipe Shed. Rabbitted All DP Run in Hole. DECOMP M / U Top Drive and Established Parameters: String Weight Up 90,000#, String Weight Down 90,000#, 5 bpm, 200 psi. Displaced Wellbore to Viscosified 8.5 ppg Seawater, 8 bpm, 350 psi. DECOMP Washed Over 9-5/8" RBP Retrieving Neck. Shut Down Pump. Stacked 5,000# on Plug, P / U w/ No Overpull, RIH, Stacked 25,000# on Plug, Applied 1/2 Righthand Turn. P / U w/ 5,000# Overpull, Lost Overpull, RBP Released, Wellbore Fluid Dropped 5 feet. Allowed Element to Relax, Monitored Well, Well Static. DECOMP Blew Down Top Drive, POOH w/ 4" DP. DECOMP POOH w/ BHA, B / O and L / D 9-5/8" RBP and Retrieving Tool. DECOMP Held PJSM. M / U Fishing BHA. 2-3/16" Spear w/ 3-1/4" Grapples - XO -Bumper Jars -Oil Jars -Pump Out Sub - XO - 12- 4-3/4" DC's. BHA Total Length = 395.62'. DECOMP RIH w/ Fishing BHA on 4" DP from Derrick. DECOMP RIH w/ Fishing BHA on 4" DP to 9,980'. P / U 4'' DP 1 x 1 from Pipe Shed. Rabbitted All DP Run in Hole. DECOMP Service Pipe Skate-Replace Cable DECOMP RIH w/ Fishin BHA t/ 10 025' DECOMP Break Circulation and Establish Parameters. Pump Rate 10 bpm at 3,350 psi. String Weight Up 168,000#, String Weight Down 155,000#. Circulate 689 bbls Viscosified 8.5 ppg Seawater Surface to Surface Taking All Returns to Slop Tank. After Well Displaced with Viscosified Seawater Circulated 575 bbls for 1 Bottoms Up. rrintea: niniz~~o I I:L 1:4L NIVI `~ BP EXPLORATION Page 12 of 16 Operations Summary Report Legal Well Name: D-26A Common W ell Name: D-26A Spud Date: 8/7/1997 Event Nam e: WORKO VER Start : 4/26/2005 End: 6/2/2005 Contractor Name: DOYON DRILLIN G INC . Rig Release: 6/2/2005 Rig Name: DOYON 16 Rig Number: Date `From - To Hours Task Code I NPT Phase Description of Operations 5/27/2005 00:00 - 00:30 0.50 FISH P DECOMP Establishd Parameters Prior to Spearing Guide. String Weight Up 165,000#, String Weight Down 150,000#, Pump Rate 6 bpm / 1,380 psi. RIH and Tagged Fish at 10,043'. Stacked 10,000# on Spear. P / U 25', RIH to to 10,043', Stacked 10,000# on Spear. Did Not Observe any Indication of Guide Going Back Over Tubing Stump. Observed 10 psi Pressure Differential On and Off Bottom. No Excess Drag Up or Down. ~ 00:30 - 04:30 4.00 FISH P DECOMP Monitored Well, Blew Down Top Drive, POOH w/ 4" DP. 04:30 - 05:30 1.00 FISH P DECOMP POOH w/ BHA. B ! O and L / D Fish, Spear and Grapple Assembly. 05:30 - 06:00 0.50 FISH P DECOMP Cleared and Cleaned Floor. 06:00 - 08:00 2.00 CLEAN P DECOMP Held PJSM. M / U Clean Out BHA. 4-3/4" Mill Shoe-Reverse Circulating Junk Basket, **Shear Pin Sub w/ 3-5/8" Stop Pads, 4 Joints 2-7/8" PAC DP, XO, Double Pin XO, 3 x Junk Baskets, Bit Sub XO, Bumper Jars, Oil Jars, Pump Out Sub, XO, 12 x 4-3/4' DCs. Total Length = 541.64'. **Hanging on Shear Pin Sub: 6" Washover Shoe-Wash Pipe Extension-Shear Guide Sub. Total Length: 8.38' 08:00 - 11:30 3.50 CLEAN P DECOMP RIH w/ Clean Out BHA on 4" DP to 10,035'. 11:30 - 13:30 2.00 CLEAN P DECOMP M / U Top Drive and Established Parameters: String Weight Up 172,000#, String Weight Down 155,000#, String Weight Rotating 165,000#, 40 rpm, Toque 4,000 ft /Ibs, 4 bpm, 960 psi. RIH, Tagged Up on Top of 4-1/2" Tubing Stub at 10,048'. ashed Down Inside Tubing Stub to 10,053'. Attempted to Wash and Ream from # - 4,000#, 50 rpm, Torque 5,000 ft /Ibs, Pump Rate 8 bpm, 2,500 psi Off Bottom, 2,750 psi On Bottom. Continued to Work Pipe in Attempt to Wash and Mill Deeper without Success. 13:30 - 14:00 0.50 CLEAN P DECOMP Pumped Slug, Blew Down op rive, onitored Well, Static. 14:00 - 17:30 3.50 CLEAN P DECOMP POOH w/ 4" DP. Stand Back 4-3/4" DC's 17:30 - 19:00 1.50 CLEAN P DECOMP POOH UD 2-7/8" PAC Dp. B/O and UD Reverse Circulating Basket and Junk Baskets. Shoe on Bottom of Reverse Circulating Basket had all Carbide Worn Off. Retrieved 3" x 22" Sliver of 4-1/2" Tubin from Reverse Circuaatn Basket Nothing from Junk Baskets. 19:00 - 20:00 1.00 CLEAN P DECOMP P/U and M/U 6" Junk Mill, 3 Junk Baskets, Bit Sub XO, Bumper Sub, Oil Jar, XO, 12 x 4-3/4" DC's. Total Length = 406.55' 20:00 - 22:30 2.50 CLEAN P DECOMP RIH w/Junk Mill BHA on 4" DP to 10,055' 22:30 - 00:00 1.50 CLEAN P DECOMP M/U Top Drive and Establish Parameters: String Weight Up 175,000#, String Weight Down 155,000#, Rotary String Weight 166,000#, Pump Rate Off Bottom at 6 bpm at 800 psi, 60 Rotary at 4,000 ft/Ibs Torque. Mill f/ 10,055'- t/ 10,058', WOM 5,000# - 6,000#. Final Circulating Rate at 8 bpm at 1,100 psi. Rotary 70 rpm at 5,000 / 7,500 ft/Ibs Torque 5/28/2005 00:00 - 03:00 3.00 CLEAN P DECOMP Milled 4-1/2" Tubing w/ 6" Junk Mill f/ 10,055' - U 10,066'. Weight on Mill 5,000#. Pump Rate 6 bpm, 780 psi. Rotary 70 rpm, Torque 6,000/ 7,500 ft /Ibs. 03:00 - 04:00 1.00 CLEAN P DECOMP Circulated Bottoms Up at 10 bpm, 1,400 psi. Pumped Slug, Blew Down Top Drive, Monitored Well-Static. 04:00 - 08:30 4.50 CLEAN P DECOMP POOH w/ 4" DP. 08:30 - 09:00 0.50 CLEAN P DECOMP POOH w/Milling BHA. B / O and L / D Lower BHA. 09:00 - 09:30 0.50 CLEAN P DECOMP Cleaned Out Junk Baskets, Recovered 2 Cups of Metal Printetl: 6/6/zoo5 11:'L1:42 AM '~ ~.~%; BP EXPLORATION Page 1'3 of 1'6' Operations Summairy Repolrf ' Legal Well Name: D-26A Common Well Name: D-26A Spud Date: 8/7/1997 Event Name: WORKOVER Start: 4/26/2005 End: 6/2/2005 Contractor Name: DOYON DRILLING INC. Rig Release: 6/2/2005 Rig Name: DOYON 16 Rig Number: Date From - To Hours Task Code. NPT Phase ~~ Description of Operations 5/28/2005 09:00 - 09:30 0.50 CLEAN P DECOMP Cuttings. Cleared and Cleaned Rig Floor. 09:30 - 10:00 0.50 CLEAN P DECOMP Held PJSM. M / U Dress Off BHA. 6" x 4-1/2" Mill Shoe, 3 x WP Extensions,Boot Basket Top Sub, Double Pin XO, 3 x Junk Baskets, Bit Sub XO, Bumper Sub, Oil Jars, XO, 12 x 4-3/4" DC's. Total Length = 422.11'. 10:00 - 13:00 3.00 CLEAN P DECOMP RIH w/ Dress Off BHA on 4" DP to 10,011'. 13:00 - 13:30 0.50 CLEAN P DECOMP M / U Top Drive and Established Parameters: String Weight Up 172,000#, String Weight Down 155,000#, String Weight Rotating 165,000#, 60 rpm, Torque 4,000 ft /Ibs, 7 bpm, 980 ', psi. Washed Over Tubing Stub at 10,066' DPM. Dressed Off: Tubin Stub from 10,066' to 10,066.5', WOM 1,000# - 3,000#, Rotary 70 rpm, Torque 5,000 ft /Ibs, 7 bpm, 1,030 psi - 1,400 psi. P / U to 10,055', Shut Down Pump and Rotary, RIH and Tagged Top of Tubing Stub at 10,066.5'. Mill and Extensions Went Over Stub. 13:30 - 14:00 0.50 CLEAN P DECOMP Pumped Slug, Blew Down Top Drive, Monitored Well, Static. 14:00 - 18:00 4.00 CLEAN P DECOMP POOH w/ 4" DP. 18:00 - 19:30 1.50 CLEAN P DECOMP B/O and Stand Back 4-3/4" DC's. B/O and UD 4-1/2" Tubing Dress Off Assy. Inside and Outside Mills Showed Wear: Recovered +/- 1 gal. Cuttings from Junk Baskets. 19:30 - 21:00 1.50 CLEAN P DECOMP P/U and M/U Reverse Circulating Basket BHA; 3-5/8" Reverse Circulating Basket (w/ 3-7/8" Shoe), Shear Pin XO Sub (no screws), 4 x 2-7/8" PAC DP, XO, Dbl. Pin XO, 3 x Junk Baskets, Bit Sub XO, Bumper Jar, Oil Jar, Pump Out Sub, XO, 12 x 4-3/4" DC's. Total Length = 551.02'. 'Hanging Below Shear Guide Sub on 2-7/8" DP = 6" x 4-1/2" Shoe, 2 x Washpipe Extension. Total Length = 8.38' 21:00 - 23:30 2.50 CLEAN P DECOMP RIH w/ Reverse Circulating BHA on 4" DP. t/ 10,060' 23:30 - 00:00 0.50 CLEAN P DECOMP M/U Top Drive and Establish Parameters; String Weight Up 175,000#, String Weight Down 155,000#, Rotary String Weight 164,000#, Off Bottom Pump Pressure at 1,370 psi with 40 spm. Rotary at 50 rpm with 4,000 fUlbs Torque. Circulate Down to 15/29/2005 100:00 - 00:30 0.501 CLEAN P 00:30 - 01:00 I 0.501 CLEAN ~ P 01:00 - 02:00 1.00 CLEAN P 02:00 - 02:30 0.50 CLEAN P 02:30 - 05:00 2.50 CLEAN P 05:00 - 06:30 1.50 CLEAN P 06:30 - 07:00 0.50 CLEAN P 07:00 - 08:00 1.00 CLEAN P DECOMP Unable to Slide in 4-1/2" Tubing, Rotated String into 4-1/2" Tubing., RIH t/ 10,116'. Tagged Up at 10,116', Rotated 55 rpm w/ 5,000 ft /Ibs Torque. Pump Rate 5 bpm, 1,900 psi. Washed and Rotated Down to 10 124'. Stacked Out at 10 124', Unable to Wash or Rotate Ahead. DECOMP Dropped Pump Out Ball, Pumped Dry Job, Monitored Well-Static. DECOMP POOH w/ 4" DP. DECOMP Serviced Top Drive. DECOMP POOH w/ 4" DP. DECOMP Stood Back 4-3/4" DC's and 1 Stand 2-7/8" PAC DP. B / O Reverse Circulating Basket and Junk Baskets and Cleaned. Recovered 1 Cup of Metal Cuttings from Junk Baskets, ,Recovered 1 - 3" x 3" Piece of Tubing from Reverse Circulating Basket Shoe. DECOMP Cleared and Cleaned Rig Floor. DECOMP Held PJSM. M / U Reverse Circulating Basket BHA: 3-5/8" Reverse Circulating Basket w/ 3-7/8" Shoe, Shear Pin XO Sub, 4 x 2-7/8" PAC DP, XO, Bumper Jar, Oil Jar, Pump Out Sub, F'fifll@tl: (il(ilLUUS 11:"L1;4'L HM BP EXPLORATION. Page 14 of t6 Operations Summary Report Legal Well Name: D-26A Common Well Name: D-26A Event Name: WORKOVER Contractor Name: DOYON DRILLING INC. Rig Name: DOYON 16 Date From - To Hours Task Code NPT 5/29/2005 07:00 - 08:00 1.00 CLEAN P Start: 4/26/2005 Rig Release: 6/2/2005 Rig Number: Spud Date: 8/7/1997 End: 6/2/2005 08:00 - 12:00 4.00 CLEAN P 12:00 - 14:00 2.00 CLEAN P 14:00 - 14:30 0.50 CLEAN P 14:30 - 17:30 ~ 3.00 ~ CLEAN ~ P 17:30 - 18:30 ~ 1.00 ~ CLEAN ~ P 18:30 - 19:30 1.00 ~ CLEAN ~ P 19:30 - 20:00 0.50 CLEAN P 20:00 - 20:30 0.50 CLEAN P 20:30 - 23:00 2.50 CLEAN P 23:00 - 00:00 1.00 CLEAN P 5/30/2005 ~ 00:00 - 00:30 ~ 0.50 ~ CLEAN ~ P 00:30 - 04:00 3.50 CLEAN P 04:00 - 05:30 1.50 CLEAN P 05:30 - 06:30 1.00 CLEAN P 06:30 - 07:30 1.00 CLEAN P 07:30 - 08:30 1.00 CLEAN P Phase Description of Operations DECOMP XO, 12 x 4-3/4" DC's. Total Length = 525.28'. *Hanging Below Shear Guide Sub on 2-7/8" DP: 6" x 4-1/2" Guide Shoe, 2 x Washpipe Extensions. Total Length = 8.38' DECOMP RIH w/ Reverse Circulating BHA on 4" DP to 10,019'. DECOMP M / U Top Drive and Established Parameters: String Weight Up 175,000#, String Weight Down 155,000#, String Weight Rotating 165,000#, Rotary 50 rpm, Torque 4,000 ft /Ibs, 5 bpm, 1,600 psi. Washed Tagged Top of 4-1/2" Tubing at 10 066' Rotated into 4-1/2" Tubing. Washed Down to 10,124', Ta ed u at 10,124'. Washed and Milled from 10,124' to 10,125', WOM 3,000#, Rotary 60 rpm, Torque 5,500 to 6,000 ft /Ibs, 5 bpm, 1,600 psi. P / U to 10,115', Shut Down Rotary, RIH and Stacked Out 12,000# on Junk /Fish, Moved Down Hole to 10 126' Pump Pressure Increased to 1,700 psi. Shut Down Pump, P / U 10' w/ 10,000# Overpull. DECOMP Dropped Ball to Pump Out Sub. Pumped Open Circulating Sub w/ 2,400 psi: Monitered Well; Static. Pumped Slug, Blew Down Top Drive. DECOMP POOH w/ 4" DP, w/ Mill Shoe 10' Above 4-1/2" Tubing Observed 20,000# Overpull, Allowed Jars to Bleed Off, P / U to 20,000# Overpull, Weight Fell Off to Up Weight. Continued to POOH w/ 4" DP. DECOMP Stand Back 4-3/4" DC's and 1 Stand 2-7/8" Pac DP. B/O Reverse Circulating Basket-NO JUNK. Inside of Reverse Circulating Basket Shoe Shows Signs of Rotating Over Junk. DECOMP M/U 3" Surecatch Overshot (w/ 1-3/4" catcher), Dbl. Pin XO, Shear Pin Sub, 4 x 2-7/8" PAC DP, XO, Bumper Jar, Oil Jar, Pump Out Sub, XO, 12 x 4-3/4" DC's. Total Length = 523.99' *Hanging on 2-7/8" PAC DP; 6" x 4-1/2" Shoe, Washpipe Ext., Washpipe Ext., Shear Guide Sub. Total Length = 9.38' DECOMP RIH w/Surecatch BHA on 4" DP DECOMP Serviced Top Drive DECOMP RIH w/ 4" DP U 10,017' DECOMP M / U Top Drive and Established Parameters; String Weight Up 177,000#, String Weight Down 155,000#, String Weight Rotating 166,000#, 4 bpm, 525 psi, Rotary 20 rpm, Torque 4,000 ft /Ibs. RIH and Tagged at 10,126'. Set Down 10,000# on Fish w/o Pumps. P / U No Overpull. Set Down x 3, Increased Stack Out Weight 5,000# Per Set Down Until Max of 25,000# was Achieved. No Overpull. Rotated Down w/ 20 rpm and 4 bpm, 550 psi. No Overpull. Increased Set Down Weight w/ Rotary to a Maximum of 20,000#, w/o Success. DECOMP Dropped Pump Out Sub Ball, Sub Opened w/ 2,450 psi. Pumped Dry Job. Monitored Well-Well Static. DECOMP POOH w/4" DP. DECOMP POOH w/ 3" Surecatch BHA; Stood Back 4-3/4" DC's and 1 Stand 2-7/8" PAC DP. B / O Surecatch Sub, Mule Shoe Showed Considerable Damaae. 12" Piece of Junk 4-1/2" DECOMP Cleaned and Cleared Rig Floor DECOMP Serviced Rig DECOMP Held PJSM. M/ U Overshot BHA: 3-5/8" O/ S Guide, 3-5/8" O Printed: 6/6/2005 11:21:42 AM ~~ BP EXPLORATION Operations Summary Report Legal Well Name: D-26A Common Well Name: D-26A Event Name: WORKOVER Contractor Name: DOYON DRILLING INC. Rig Name: DOYON 16 Date From - To Hours ' Task ~I Code NPT - _ - _ __ CLEAN P 5/30/2005 07:30 - 08:30 1.00 Start: 4/26/2005 Rig Release: 6/2/2005 Rig Number: Page 15 of 16 ~ Spud Date: 8/7/1997 End: 6/2/2005 Phase Description of Operations DECOMP / S w/ 2-1/2" Grapple, 3-5/8" O / S Extension, Top Sub, Double Pin XO, Shear Pin Sub, 4 x 2-7/8" PAC DP, XO, Bumper Jar, Oil Jar, Pump Out Sub, XO, 12 x 4-3/4" DC's. Total Length = 524.82'. 'Giude Sub Assembly on 2-7/8" DP: 6" x 4-1/2" Guide Shoe, 2 x Washpipe Extensions. Total Length = 8.38' 08:30 - 11:30 3.00 CLEAN P DECOMP RIH w/ Overshot BHA on 4" DP to 10,019'. 11:30 - 12:30 1.00 FISH P DECOMP M / U Top Drive and Established Parameters: String Weight Up 175,000#, String Weight Down 155,000#, String Weight Rotating 165,000#, Rotary 40 rpm, Torque 3,000 ft /Ibs, 5 bpm, 680 psi. Washed Down to 10,126', Tapped up at 10,126'. Washed and Worked O / S Down to 10,127'. Shut Down Pump, Stacked 20,000# on Fish. 12:30 - 13:00 0.50 FISH P DECOMP Dropped Ball to Pump Out Sub. Pumped Open Circulating Sub w/ 2,400 psi. Monitered Well, Static. Pumped Slug, Blew Down Top Drive: 13:00 - 16:00 3.00 FISH P DECOMP POOH w/4" DP. 16:00 - 17:30 1.50 FISH P DECOMP POH w/ BHA; Stand Back 4-3/4" DC's and 1 Stand 2-7/8" PAC DP. B/O Overshot Extension-NO JUNK 17:30 - 18:00 0.50 FISH P DECOMP Clear and Clean Rig Floor 18:00 - 19:00 1.00 FISH P DECOMP M/U Mill /Reverse Circulating Basket BHA;3-5/8" Reverse Circulating Basket (w/ 3-7/8" Mill Shoe), Dbl. Pin XO, Shear Pin Sub, 4 x 2-7/8" PAC DP, XO, Bumper Jar, Oil Jar, Pump Out Sub, XO, 4x4-3/4" DC's. Total Lenght = 526.70'. 19:00 - 21:30 2.50 FISH P 21:30 - 00:00 2.50 FISH P 5/31/2005 100:00 - 00:30 I 0.501 FISH I P 00:30 - 01:00 ~ 0.50 ~ FISH ~ P 01:00 - 04:30 3.50 FISH P 04:30 - 05:30 1.00 FISH P 05:30 - 06:00 0.50 FISH P 06:00 - 07:00 1.00 FISH P 07:00 - 08:00 1.00 FISH P 08:00 - 09:30 1.50 FISH P 09:30 - 10:30 1.00 FISH P 10:30 - 12:00 1.50 FISH P 12:00 - 12:30 0.50 FISH P 12:30 - 13:00 ~ 0.50 ~ FISH ~ P 'Guide Assembly Hanging from Shear Guide Sub, 6" x 4-1/2" Shoe, 2 x Washpipe Ext., Shear Pin Guide. Total Length = 8.37' DECOMP RIH w/ Reverse Circulating BHA on 4" DP U 10,116' DECOMP M/U Top Drive and Established Parameters; String Weight Up 173,000#, String Weight Down 155,000#, Rotary String Weight 162,000#, 8 bpm, 1,720 psi, Rotary 80 rpm, Torque 4,000 ft / Ibs, Washed Down and Tagged at 10,127'. Mill f/ 10,0127' U 10 127.5'. WOM 2,000# to 3,000#. 80 rpm, Torque 5,500 ft / lbs. DECOMP Mill f/ 10,127.5 - U 1,0127.5. WOM 5,000#, 2 bpm, 525 psi. 80 rpm, Torque 5,500 ft / lbs. DECOMP Dropped Pump Out Sub Ball, Opened Sub w/ 2,400 psi, Pump Dry Job. Blew Down Top Drive, Monitored Well-Well Static. DECOMP POH w Mill/ Rev. Circ. Basket BHA on 4" DP DECOMP POH w/ BHA; Stand Back 4-3/4" Dc's & 1 Stand 2-7/8" PAC DP. B/O Mill, Recovered Misc. Pieces of Tubing and Packer Sli Se ments. Mill Worn Out DECOMP Clean and Clear Rig Floor DECOMP RIH w/ Mill & Rev. Circ. BHA DECOMP RIH w/ 4" DP U 3,039' DECOMP Slip and Cut Drlg. Line DECOMP POH w/ 4" DP DECOMP UD BHA DECOMP Clean and Clear Rig Floor, Remove all Excess BHA Components from Rig Floor DECOMP R/U and Test Casing U 2,000 psi. Lost 1,000 psi. in 15 min. Pfintetl: 6/6/2005 11:21:42 AM ~' BP EXPLORATION Page 16 of 16 I Operations Summary Report Legal Well Name: D-26A Common Well Name: D-26A Event Name: WORKOVER Contractor Name: DOYON DRILLING INC. Rig Name: DOYON 16 Date From - To Hours ' Task Code NPT 5/31/2005 13:00 - 13:30 0.50 FISH P 13:30 - 14:30 1.00 FISH P 14:30 - 15:30 1.00 FISH P 15:30 - 20:30 5.00 FISH P 20:30 - 21:30 1.00 FISH P 21:30 - 22:00 0.50 FISH P 22:00 - 00:00 2.00 FISH P 6/1/2005 00:00 - 02:30 2.50 TA P 02:30 - 09:30 7.00 TA P 09:30 - 10:00 0.50 TA P 10:00 - 12:30 2.50 TA P 12:30 - 13:30 1.00 TA P 13:30 - 17:00 3.50 TA P 17:00 - 17:30 0.50 TA P 17:30 - 18:00 0.50 TA P 18:00 - 20:00 2.00 TA P 20:00 - 21:00 1.00 TA P ii 21:00 - 21:30 0.50 TA P ~, 21:30 - 23:00 1.50 TA P 23:00 - 00:00 1.00 TA P 6/2/2005 00:00 - 01:00 1.00 TA P 01:00 - 02:00 1.00 TA P 02:00 - 03:00 ~ 1.00 ~ TA ~ P 03:00 - 03:30 0.50 TA P 03:30 - 04:00 0.50 WHSUR P Spud Date: 8/7/1997 Start: 4/26/2005 End: 6/2/2005 Rig Release: 6/2/2005 Rig Number: Phase Description of Operations DECOMP Service Top Drive DECOMP Pressure Up to 2,000 psi. Observed Preessure Loss. Bring Pump Back Online and Maintain Pump Pressure of 2,000 psi. Pump Rate of .5 BPM (5 spm). Injection Rate of 30 bph DECOMP L/D 2-7/8" PAC DP and All Handling Tools DECOMP M/U Halliburton 9-5/"' EZSV Bridge Plug and RIH on 4" DP DECOMP Set EZSV at 9,830'. Pressure Test to 1,500 psi. Hold Pressure Test f/ 30 min. DECOMP Take On 8.5 ppg Seawater in Pits 3 & 4 DECOMP Reverse Circulate Wellbore with Clean 8.5 ppg Seawater. Taking All Fluids from Wellbore to Slop Tank ABAN Displace Wellbore with Clean 8.5 ppg Seawater ABAN POHLDDP ARAN P/U 9-5/8" Halliburton EZ-SVB Bridge Plug and prepare to RIH to set @ +/- 3,000'. ARAN RIH 9-5/8" EZ-SVB on DP from Derrick. ABAN Set EZ-SVB @ 3,000' and test to 1,500 psi for 30 minutes. ABAN POOH and UD DP. ABAN Pull Wear Ring, Clean and Clear Rig Floor ABAN R/U Tubing Handling Equipment ABAN RIH " 1 ABAN P/U TCII XO and M/U to Landing Joint. P/U Hanger and NSCT x Vam Top Tubing Pup Jt. XO amd M/U to Kill String. RIH and Land Tubing. RILDS ABAN Set TWC and Test from Below t/ 1,000 psi ABAN N/D BOPE ABAN N/U Production Tree ARAN PJSM-R/U DSM Lubricator and Pulll TWC. R/D Lubricator ARAN R/U Circulating Lines and Hot Oil to IA. R/U to Tubing toTake Returns to Slop Tank ABAN Reverse Circulate Diesel Down IA Taking Returns Up Tubing. Pumping Rate 2.5 bpm @ 1,000 psi ARAN U-Tube Diesel from IA to Tubing, R/D Circulating Lines WHDTRE Set BPV, Test from Below t/ 1,000 psi. Released Rig at 0400 hrs., 6/2/05 Printed: 6/6/2005 11:21:42 AM TREE = 4" CIW WFl'~HEAD = FMC ACTUATOR = AXELSON KB. ELEV = 72.7' BF. EtEV = 42.42' KOP = 3400' Max Angle = 104 @ 11031' Datum MD = 10667' Datum TV D = 8800' SS I4-1/2" KILL STRING, 12.6#, L-80, ID = 3.958" i-i 2544• 13-318" CSG, 72#, L-80, ID = 12.347" 2707' Minimum ID = 2.37" @ 10160' 3.75" X 2-718" LNR XO TOP OF 7" LNR 981 9-5/8" CSG, 47#, L-80 BUTT, ID = 8.681" TOP OF 2-7/8" LNR PERFORATION SUMMARY REF LOG: SPERRY SUN GRIROP 06/03!97 ANGLEATTOPPERF: 101 @ 11150' Note: Refer to Production DB for historical perf data SIZE SPF INTERVAL Opn/Sqz DATE 1-11/16" 4 11150 - 11285 O 06/16/97 1-11/16" 4 11950 - 12080 O 06/16/97 1-11/16" 4 12340 - 12390 O 06/16!97 4" 4 10730 - 10750 S 06/14(97 4-1/2" TBG, 12.6#, L-80 AB/BTC, .0152 bpf, ID = 3.958" ~ WHIPSTOCK (CEMENTm) ~ 7" LNR, 26#, L-80, .0383 bpf, ID = 6.276" 11068' PBTD -1 2-718" LNR, 6.16#, L-80 STL, .0058 bpf, ID = 2.441" 2533' -j4-112" OTIS SSSV NIP, ID = 3.813" 2$44' 4-1/2" WLEG, ID = 3.958" 9-5/8" HALCO EZ-SVB BP (06/01105) 9-518" EZ-SVB (05!31105) i 9-5/8" X 7" BOT LNR HGR, ID = ? 10066' --~4-1/2" TBG STUB (D16 RKB) 05/28/05 10128' FISH -BKR IBP w /UNDETERMINED DEBRIS ON TOP (06/01105) 10157, 1--13.75" BKR DEPLOY SLV, ID = 3.00" 101 3.75" X 2-7/8" XO, ID = 2.377" 10676' -~ 4-1/2" OTIS XA SLD SLV, ID = 3.813" 10701'-10738' BLAST JOINTs 10739' BKR K-ANCHOR LATCH, ID = 4.00" 10741' 7" X 4-1/2" BKR PKR, ID = 4.00" BEHIND CT LNR 10746' 4-1/2" OTIS XN NIP, ID = 3.725" 10749' -~4-112" BKR TBG TAIL, ID = 3.958" 10765' ELMD TT LOGGED 02/09/86 ` MILLOUT WINDOW (D-26A) 10808' - 10816' DATE REV BY COMMENTS DATE REV BY COMMENTS 02/12/86 N18E ORIGINAL COMPLETION 12/02/07 CUPJC DRAWING CORRECTIONS 04/07/89 N1 ES RWO 06/17/97 WHITLO CTD HORZ SIDETRACK "A" 05/17/05 N4ES RWO SUSPENDED 06/01/05 D-16 RWO SUSPENDED 10/23/07 TWPJC DRAWING CORRECTIONS PRUDHOE BAY UNfi WELL: D-26A PERMIT No: 1970870 API No: 50-029-21530-01 SEC 23, T11 N, R13E BP F~rpioration (Alaska) D 2 6A SAFETY NOTES: TWO RIGATTEMPTS @ RWO ~ WERE SUSPENDED WITH KILL STRING LEFT IN WELL 612005 ~ ~~ r ~~ ~~~~ ~~ ~•-~ SARAH PALIN, GOVERNOR ~~T 0 OII/ nisD ~ £ 333 W. 7th AVENUE, SUITE 10 CO1~T5ERQA'1`I011T COM11i1551021T ~~ ANCHORAGE, ALASKA 99501-3539 PHONE (907) 279-1433 FAX (907) 276-7542 Terrie Hubble Drilling Technologist BP Exploration Alaska, Inc. PO Box 196612 /y Yf Anchorage, AK 99519-6612 ~~ ' ~`~ J ~~ Re: Prudhoe Bay Field, Prudhoe Bay Oil Pool, PBU D-26A Sundry Number: 307-328 ~~~~ NOV ~ ~ 2007 Dear Ms. Hubble: Enclosed is the approved Application for Sundry Approval relating to the above referenced well. Please note the conditions of approval set out in the enclosed form. When providing notice for a representative of the Commission to witness any required test, contact the Commission's petroleum field inspector at (907) 659-3607 (pager). As provided in AS 31.05.080, within 20 days after written notice of this decision, or such further time as the Commission grants for good cause shown, a person affected by it may file with the Commission an application for rehearing. A request for rehearing is considered timely if it is received by 4:30 PM on the 23rd day following the date of this letter, or the next working day if the 23rd day falls on a holiday or weekend. A person may not appeal a Commission decision to Superior Court unless rehearing has been requested. DATED thisc! D day of October, 2007 Encl. Sincerely, Errs ~o%~~ ''~ l°- "`'7 / a~~~ ~,~EIVED STATE OF ALASKA ~V ALASKA OIL AND GAS CONSERVATION COMM ION ~,~~ ~C~T 2 3 Zp07 APPLICATION FOR SUNDRY APPROVAL ~~~ 20 AAC 25.280 slacks Oil & Gas Cons. Cofnmiss-on 1. Type of Request: ^ Abandon ®Suspend ^ Operation Shutdown ^ Perforate ^ Time Extension nt: °~ ^ Alter Casing ^ Repair Well ^ Plug Perforations ^ Stimulate ^ Re-Enter Suspended Well ^ Change Approved Program ^ Pull Tubing ^ Perforate New Pool ^ Waiver ^ Other 2. Operator Name: 4. Current Well Class: 5. Permit To Drill Number BP Exploration (Alaska) Inc. ®Development ^ Exploratory 197-087' 3. Address: ^ Service ^ Stratigraphic 6. API Number: P.O. Box 196612, Anchorage, Alaska 99519-6612 50-029-21530-01-00 ' 7. If perforating, closest approach in pool(s) opened by this operation to nearest 8. We11 Name and Number: property line where ownership or landownership changes: PBU D-26A Spacing Exception Required? ^ Yes ®No 9. Property Designation: 10. KB Elevation (ft): 11. Field /Pool(s): ADL 028284 72.7' Prudhoe Bay Field / Prudhoe Bay Pool 12. PRESENT WELL. CONDITION SUM MARY Total Depth MD (ft): Total Depth TVD (ft): Effective Depth MD (ft): Effective Depth TVD (ft): Plugs (measured): Junk (measured): 12490 r 9051 12415 9037 3000 & 9830 10066 Ca in Len th Siz MD TVD Burst Coll se Structural C nduc or 110' 20" 11 110' S rface 2709' 13-3/8" 2709' 2709' 4930 2670 Intermediate 10137' 9-5/8" 10137' 8478' 6870 4760 Prod ction Liner 1203' 7" 9867' - 10808' 8282' - 8977' 8160 7020 Liner 2-7/8" 10157' - 12482' 8493' - 9050' 13450 13890 Perforation Depth MD (ft): Perforation Depth TVD (ft): Tubing Size: Tubing Grade: Tubing MD (ft): 10730' - 12390' 8919' - 9032' 4-1 /2", 12.6# L-80 2544' & 10066' -10749' Packers and SSSV Type: 7" x 4-1/2" Baker packer Packers and SSSV MD (ft): 10741' 13. Attachments: 14. Well Class after proposed work: ® Description Summary of Proposal ^ BOP Sketch ^ Exploratory ®Development ^ Service ^ Detailed Operations Program 15. Estimated Date for 16. Well Status after proposed work: Commencin O erations: ^ Oil ^ Gas ®Plugged ^ Abandoned 17. Verbal Approval: Date: ^ WAG ^ GINJ ^ WINJ ^ WDSPL Commission Representative: 18. I hereby certify that the foregoing is true and correct to the best of my knowledge. Contact Chidi Igbokwe, 564-4795 Printed Name Terrie Hubble Title Drilling Technologist Prepared By Name/Number: Signature ~ ~ Phone 564-4628 Date ( Z3J~ Terrie Hubble, 564-4628 Commission. Use Onl Sundry Number: ~ Conditions of approval: Notify Commission so that a representative may witness ^ Plug Integrity ^ BOP Test ^ Mechanical Integrity Test ^ Location Clearance Other: S ~tp ACT ~ 1 2007 Subsequent Form Required: '~1~~ w ~~ APPROVED BY ~ ~ ~ " A roved B OMMISSIONER THE COMMISSION Date r Form 10-403 Revised 06/2006 ~~ "' ~ ~. Submit In Duplicate ~~~R1G1 L • by Terrie Hubble Technical Assistant BP Exploration (Alaska) Inc. Drilling & Wells 900 East Benson Boulevard P.O. Box 196612 Anchorage, Alaska 99519-6612 (907) 561-5111 October 23, 2007 Alaska Oil & Gas Conservation Commission 333 West 7th Avenue, Suite 100 Anchorage, Alaska 99501 Reference: API # 50-029-21530-01-00 Permit # 197-087, PBU D-26A Direct: (907) 564-4628 Terrie.hubble~bp.com To Whom It May Concern: PBU D-26A is currently in an Operations Shutdown status and BP would like to request that the status be changed to Suspended. The well is currently secured by two EZSV bridge plugs; one at 3000' MD and the other at 9830' MD, which were placed in the well during the (failed) workover attempt. The plan for the workover had been to replace the tubing due to tubing by IA communication. Unfortunately "junk" was left on top of the 2-7/8" liner at 10028'. Plans were developed in mid-2006 to sidetrack the well, but that sidetrack has not yet occurred. Therefore, since the well is adequately secured, BP would like to change the status of the well to Suspended in order to retain the ability to sidetrack this well in the future. Thank you very much for your assistance in this matter. Sincerely, ~- ~~ Terrie Hubble xc: Well Files PDC Chidiebere Igbokwe, Petroleum Engineer ,TRH = 4" CNV KLL STRgVG, 12.6#, L-80, ID = 3.958" ~ 2544' 13-3/8" CSG, 72#, L-80, ~ = 12.347" 270T Minimum ID = 2.37" @ 10157' TOP OF 2-7/8" LINER TOP OF 7" LNR ~ 986T s-s/8" csG, a7#, L-eo, ID = s.sar' 10136' TOP OF 2-7/8" LNR 10157' L 4-112" TBG, 12.6#, L-80, .0152 bpf, ID = 3.958" ~ 10749' I PERFORATION SUMMARY REF LOG: SPERRY SUN GRIROP 06/03197 ANGLEAT TOP PQ2F: 101 @ 11150' Note: Refer to Production DB for historical perf data SQE SPF INTERVAL Opn/Sqz DATE 1-2/3" 4 11150 - 11285 O 06/16/97 1-2/3" 4 11950- 12080 O 06/16/97 1-213" 4 12340- 12390 O 06/16/97 4" 4 10730 - 10750 O CEMENTED WH~STOCK 10765' PBTD 11026' 7" LNR, 26#, L-80, .0383 bpf, ID = 6.276" 11068' ~'2 6A ( w~ sus aoEn wm~ Ia~rwN~~Lo-T N 2533' ~ 4-112" OTIS SSSV NIP, ~ = 3.813" 2544' 4-1/2" WLEG, ID = 3.958" 3000' ~--~ 9-5/8" HALCO EZ-SVB BP (06/01/05) 10066' TOP OF 4-112" DRESSED STUMP (D16 RKB) ~ 10128' BKR IBP FISH (06/01/05). SOME JUNK j (:~ ~ ~ ~;t(~ (~~, (? . REMAIN~IG ON TOP OF R (D16 RKB) v I 101 ST -~ DEPLOY MENT SLEEV E 10676' 4-112" OTIS XA SLIDING SLV, ID = 3.813" 10701'-10738' BLAST JOINTS 10739' BKR K-22 ANCHOR 10741' 7" X 4-1/2" BKR PKR, ID = 4.00" 10746' 4-1 /2" OTIS XN NIP, ID = 3.725" --~ 10749' 4-1/2" BKR TBG TAIL, ID = 4.00" 10765' ELMD TT LOGGED 02/09/86 MILLOUT WMIDOW 1o8oa' -1oa1s' \_ ~OC~C~- PBTD --j 12415' r 2-7/8" LNR, 6.16#, L-80, .0058 bpf, ID = 2.37" DATE REV BY COMMENTS DATE REV BY COMMENTS 02112186 ORIGINAL COMPLETION 04/07/89 DFF RWO 06/17/97 WHITLO SIDETRACK COMPLETION 08101105 JDMRLH I7V110 SUSPBrD® 03/05/02 RN/TP CORRECTIONS 04/26/05 NBFRLH CHEM CUT (04/08/05) PRUDHOE BAY UNIT WELL: D-26A PEPoNff No: 1970870 AR No: 50-029-21530-01 SEC 23, T11 N, R13E BP 6cploration (Alaska) ~,,'~ IT:, ',rÆ!å,'!, Tr: ~,." r j" " jf ~w.'" ,!~ ',fTllO" '" ,, -""',' A~"8 1"n, /''1\''\' f"ñ", , \ "r1, /"7, i~7\,' ' j " ." I' "'\,.111 il\ 'I, . : ' .:::¡ ,,' '¡ ,1 I L \ \>, J r\ ! ¡, \, L, I U, ! ï1 \ ¡ L jJÏ\ \ n) J 1J, \ "J, " l' ....~ ' .:W ~J t....::::J ~ ~ \...':,::"./:_ \..J.:.:-J W e FRANK H. MURKOWSKI, GOVERNOR AI,ASIiA OIL AND GAS CONSERVATION COMMISSION 333 W. 7'" AVENUE. SUITE 100 ANCHORAGE, ALASKA 99501-3539 PHONE (907) 279-1433 FAX (907) 276-7542 Dave Wesley Senior Petroleum Engineer, ENS BP Exploration (Alaska) Inc. PO Box 196612 Anchorage, AK 99519-6612 ,';",-r~h\~""~~r;, JUN 9', 2 \",3'\¡¡ I.rU"'(!ð~~,>" ~v Re: Prudhoe Bay Field, Prudhoe Bay Oil Pool, PBU D-26A Sundry Number: 306-211 Dear Mr. Wesley: Enclosed is the approved Application for Sundry Approval relating to the above referenced well. Please note the conditions of approval set out in the enclosed form. When providing notice for a representative of the Commission to witness any required test, contact the Commission's petroleum field inspector at (907) 659-3607 (pager). As provided in AS 31.05.080, within 20 days after written notice of this decision, or such further time as the Commission grants for good cause shown, a person affected by it may file with the Commission an application for rehearing. A request for rehearing is considered timely if it is received by 4:30 PM on the 23rd day following the date of this letter, or the next working day if the 23rd day falls on a holiday or weekend. A person may not appeal a Commission decision to Superior Court unless rehearing has been requested. Sincerely, DATED thisLl day of June, 2006 Encl. lCJj- - 6'Y'1- tJlTJ (, / /~C. ~fC (J1J~/è).6 an-(,jíe(ov ¡,J4A- ("ll'tlz..ooú> STATE OF ALASKA. RECEIVED ALASKA L AND GAS CONSERVATION CO~ISSION JUN 1 3 2006 APPLICATION FOR SUNDRY APPROVAL 20 MC 25.280 Alaska Oil & Gas Cons. Commission Anchoraae 1. Type of Request: 181 Abandon o Alter Casing o Change Approved Program / o Repair Well 0 Plug Perforations 0 Stimulate o Pull Tubing 0 Perforate New Pool 0 Waiver 0 Other o Operation Shutdown 0 Perforate 0 Time Extension 0 Re-Enter Suspended W 2. Operator Name: BP Exploration (Alaska) Inc. 3. Address: P.O. Box 196612, Anchorage, Alaska 7. KB Elevation (ft): 4. Well Class Before Work/" 181 Development 0 Exploratory o Stratigraphic 0 Service 5. Permit T,.9--Ðrill Number 197-087/305-137 6. API Number: / 50- 029-21530-0 1-00 99519-6612 72.7' 9. Well Name and Number: PBU D-26A /" 10. Field / Pool(s): Prudhoe Bay Field / Prudhoe Bay Pool o 0 Effective Depth TVD (ft)· Plugs (measured): Junk (measured): 9037 3000 10066 TVD Burst Collapse 8. Property Designation: ADL 028284 11. 0 o. Total Depth MD (ft): Total Depth TVD (ft): Effective Depth MD (ft): 12490 9051 I 12415 Casinç¡ LenQth Size MD Structural Conductor Surface I ntermed iate Production Liner 110' 2709' 10137' 20" 13-3/8" 9-5/8" 110' 2709' 10137' 110' 2709' 8478' 4930 6870 2670 4760 1203' 7" 9867' - 10808' 10157' - 12482' 8282' - 8977' 8493' - 9050' 8160 13450 7020 13890 Liner 2-7/8" perf0.TIb\ßDepth MD (ft): I Perforation Depth TVD (ft): I ...,J.(þ' '12390' 8919' - 9032' Packers and SSSV Type: 7" x 4-1/2" Baker packer Tubing Size: / 4-1/2", 12.6# Tubing MD (ft): 2544' & 10066' -10749' 12. Attachments: 181 Description Summary of Proposal 0 BOP Sketch o Detailed Operations Program 14. Estimated Date for Commencing Operations: Tubing Grade: L-80 I Packers and SSSV MD (ft): 10741' / 13. Well Class after proposed work: / o Exploratory 181 Development 0 Service 16. Verbal Approval: Commission Representative: 17. I hereby C:~ertify that the foregoing is true and correct to the best of my knowledge. Contact John Rose, 564-5271 Printed Name ave Wesley " Title Senior Petroleum Engineer, ENS , /' / f / I Prepared By Name/Number: Signature 'd~VÚ....-Ú,,( ~ Phone 564-5153 Date ~IÍV8Þ Terrie Hubble, 564-4628 / <. Commission Use Only September{ )006 Date:u 15. Well Status after proposed work: OOil OGas o WAG 0 GINJ o Plugged OWINJ 181 Abandoned o WDSPL Conditions of approval: Notify Commission so that a representative may witness o Plug Integrity ~OP Test 0 Mechanical Integrity Test 0 Location Clearance 1 Sundry Number~?¡y () - ~J I RBDMS 8Ft ¡I IN Q ('i 7nn6 Other:T~t BoP£' fo ~c:;oo ()~ . Pur~t- "\-r:1lo J\.f\{ l-ç. Ill. li) I ~l ~ t <. ~il phu¡9Ù~ p1'Ot.ltk~ " <- Ctfp ¡,o lie d. Subsequent Form Required: 10 - 4.oM RBDMS 8Ft .lUN 2 0 2006 Approved By, lI-JV~ COMMISSIONER ~~~';;~~~'~'ON Date t-If..øb Fonn 1<>-403 Re.",d 0712005 0 Rí G TN A L '- Submit In Duplicate . . To: Winton Aubert - AOGCC Date: June 8, 2006 From: John Rose - BPXA GPB Rotary Drilling Subject: D-26B Application for Sundry Approval - P&A for Sidetrack Operations Approval is requested for the proposed P&A of PBU well D-26A. This Zone 2 Ivishak producer is currently shut-in fortû6T¡'~IA communication and a failed workover in May/June of 2005 and is currently secured by 2 EZSV bridge.e!YgS at 3000' MD and 9830' MD which were placed in the well during last year's failed work- 0~1I (D-26), which was originally completed in 02/86, was sidetracked with coil in 1997 and completed as a Zone 2 producer. In 08/04, T x IA communication was noted and a rig work-over was planned to replace the 4-1/%completion string, however, problems during the work-over place the well into its current inoperable status. With "junk" on top of the current 2-7/8" liner at 10,157' MD (milled decompletionlpacker debris, a lost IBP, etc.) and low probability that we can squeeze cement to the current perforations at 10,730'- 10,750' MD, the current plan to P&A this well is to place -250' of 15.8 ppg Class G cement on top of the lower /' EZSV currently in the well at 9830'. As the 9-5/8" casing in this well has been successfully tested to 3500 psi from 9850' MD (5/10105), the current sidetrack plan is to make a whip-stock exit of the parent D-26B wellbore in the existing 9-5/8" casing at -8320' MD with an 8-1/2" drilling assembly. The 8-1/2" hole will be drilled to the top of the Sag River formation where 1''';/ a 7" liner will then be run and cemented. A 6-1/8" wellbore will then be built to horizontal, landing just above the base of Zone 2B. The planned 6-1/8" hole will then be drilled horizontally for approximately 663' staying above the HOT. A solid 4-1/2" production liner will be cemented in place when the well is TD at a planned depth of 12,626' MD. The D-26B sidetrack is currently scheduled for DOy¢14,,4, eþéginning the first week of October, 2006. The pre· rig work for this sidetrack will be priority scheduled ~Ge"Sundry approval has been obtained. Estimated Pre-Rig Start: 09/01/06 Estimated Spud Date: 10101/06 John Rose GPB Rotary Drilling Engineer Ph: 564-5271 CC: Well file Terrie Hubble I Sondra Stewman D-26B Application for Sundry . . PBU Sidetrack D-26B Operations Summary (06/7/06) Current Condition: ./ Well currently shut in with a 4-1/2" kill string at 2544' MD and 2 CIBP's set at 3000' MD and 9830' MD. /' ./ MITOA passed to 2000 psi on 4/8/05. ./ The 9-5/8" tested to 3500 psi for 30 minutes from a retainer at 9850' on 5/10/05. ./ The 9-5/8" tested to 3500 psi for 30 minutes from a retainer at 3000' on 6/01/05. ./ Top of 4-1/2" stub at 10,066' MD w/junk on top of 2-7/8" liner. ./ Well injectivity at 30 bph at 2000 psi during last RWO. ./ Well is loaded with seawater and diesel freeze protect. '" .£ ~ ~ "'" ~ 'd- Pre-Ria Work: 1. Bleed OA, IA & tubing to 0 psi. PPPOT-T & IC. Function all LDS. 2. CMIT TxlA to 3500 psi. ./ 3. MIT OA to 2000 psi. 4. Bleed casing and annulus pressures to zero. 5. Set a BPV and test to 1000 psi from tubing annulus. Secure the well. Level the pad as necessary. Q Ria Operations: 1. MI I RU 2. Circulate out diesel freeze protection and displace the well to seawater. Install TWC. 3. Nipple down tree. Nipple up and test BOPE to 3,500psi. 1'ull TWC. 4. R/U. Pull 4 W' tubing (kill string) from 2544'. 5. MU 8-1/2" clean-out assembly and clean-out the 9-5/8" casing down to the top ~he EZSV at 9830' TMD. This clean-out run will include drilling-up the EZSV currently set at 3000' MD. 6. RIH with open-ended drillpipe and place 250' balanced plug of 15.8 ppg G cement on top of the EZSV at 9830' MD. 7. Pressure test 9-5/8" casing to 3500 psi for 30 minutes and chart. 8. RIH with 9-5/8" GR/JB & GR/CCL to TOC -9580' MD in preparation to set EZSV for whipstock. 9. Set 9-5/8" EZSV retainer and set at ±8344' to allow for an 8320' MD whip-stock KOP. and RIH with 9 5/8" Baker bottom-trip anchor whip stock assembly. Orient whipstock as desired and set on bridge plug at 8344' MD. Shear off of whip-stock. 11. Displace the well to 10.4 ppg LSND. Mill the window and 20' new formation. Perform FIT to 11.3 ppg. 12. RIH w/8 W' DIR/GR/Res drilling assembly and drill to top Sag River. POH. 13. Run and cement 7" L-80 BTC-M drilling liner. 14. RIH with 61/8" TCI bit I motor assembly with GR/Res/ABI to landing collar. 15. Test casing to 3500 psi. Drill shoe tract. 16. Displace the well to 8.4 ppg Flo-Pro drilling fluid. Drill 20' formation; perform FIT to 9.5 ppg EMW. 17. Drill ±1300' to land in horizontal section in Z2B. CBU, POH. 18. RIH with PDC I motor assembly with real-time Neu/Den. 19. MAD pass build section to 100' above PGOC per the well-site geologist and continue drilling to TD at ±12626' MD. 20. Circulate, short trip, spot liner running pill, POOH. 21. Run and cement a 4 W', 12.6#, L-80, IBT-M solid production liner. POOH. 22. RIH with 2 W' perf guns and perforate ±800'. POH and LDDP and perf guns. 23. R/U and run 4 1/2", 12.6#, 13Cr, VamTop completion tubing. Land the tubing RILDS. 24. Reverse circulate inhibited seawater to the packer depth. 25. Drop ball & rod and set packer and individually test the tubing and annulus to 3,500psi 30 minutes. Record each test. 26. Shear the DCK valve and pump each way to confirm shear. 27. Set a TWC and test to 1000 psi. 28. Nipple down the BOPE. Nipple up the tree and test to 5,000psi. Pull TWC w/lubricator. 29. Freeze protect the well to -2,100' 30. Install BPV and secure the well. 31. Rig down and move off. -.. .'" i D-26B Application for Sundry . . Post-Riq Work: 1. Install well house and instrumentation. 2. MI / RU slick-line. 3. Pull the ball and rod / RHC plug from landing nipple below the production packer. 4. Install gas lift valves. 5. POP well to test unit until cleaned up. Well Coordinates: Surface Location: Target Start Location: Bottom Hole Location: x = 653,463 / Y = 5,959,273 X = 649,318 / Y = 5,960,994 X = 647478 / Y = 5,960,768 Z = 8,923 TVDss Z = 8,930' TVDss D-268 Application for Sundry TREE = 4" CrN WELLHEAD = FMC . ACTUA TOR = AXELSON KB. ELEV = 72,7' BF. ELEV = 42.42' KOP = 3400' MaxAngle= 104@11031' Datum MO = 10667' Datum TVO = 8800' SS 14-1/2" KILL STRING, 12.6#, L-80, 10 = 3.958" 113-3/8" CSG, 72#, L-80, 10 = 12.347" I D-26A S~NOTES: TWO RIG ATTEMPTS @ RWO W~USPENDED WITH KILL STRING LEFT IN WELL 6/2005 2533' -14-1/2" OTIS SSSV NIP, 10 = 3.813" I 2544' -14-1/2" WLEG, 10 - 3.958" I Minimum ID = 2.37" @ 10157' TOP OF 2-7/8" LINER TOP OF 7" LNR I 19-5/8" CSG, 47#, L-80, 10 = 8.681" I TOPOF2-7/8" LNR I 10136' 10157' 9867' 14-1/2" TBG, 12.6#, L-80, .0152 bpf, 10 = 3.958" I 10749' ÆRFORA TION SUMMARY REF LOG: SÆRRY SUN GRlROP 06/03/97 ANGLEATTOPÆRF: 101 @ 11150' Note: Refer to A"oduction DB for historical perf data SIZE SPF INTERV AL Opn/Sqz OA TE 1-2/3" 4 11150 -11285 0 06/16/97 1-2/3" 4 11950 - 12080 0 06/16/97 1-2/3" 4 12340 - 12390 0 06/16/97 4" 4 10730 - 10750 S 1997 1 CEMENTED WHIPSTOCK I PBTD I 17" LNR, 26#, L-80, .0383 bpf, 10 = 6.276" 1 OA TE REV BY COMMENTS 02/12/86 ORIGINAL COMPLETION 04/07/89 DFF RWO 06/17/97 WHITLO SIDETRACK COM PLETION 06/01/05 JDMITLH RWO SUSPENDED 03/05/02 RNlTP CORRECTIONS 04/26/05 NBFITLH CHEM CUT (04/08/05) 3000' -i 9-5/8" HALCO EZ-SV (06/01/05) 9830' 1-19-5/8" HALCO EZ-SV (05/31/05) -1 TOP OF 4-1/2" DRESSED STUMP (016 RKB) BKR IBP FISH (06/01/05). SOME JUNK REMAINING ON TOP OF IT (016 RKB) -1 DEA...OYMENT SLEEVE 1 -14-1/2" OTIS XA SLIDING SLY, 10 = 3,813" 10701'·10738' --¡BLAST JOINTS 1 10739' H BKR K-22 ANCHOR 1 10741' -17"X4-1/2"BKRA<R,10=4.00" 1 10746' -14-1/2" OTIS XN NIP, 10 = 3.725" 1 10749' -14-112" BKRTBGTAIL,10=4.00" I 1 0765' H ELMO IT LOGGED 02/09/861 MILLOUT WINDOW 10808' - 10816' 12-7/8" LNR, 6.16#, L-80, .0058 bpf, 10 = 2.37" DATE REV BY COMMENTS PRUDHOE BAY UNIT WELL: D-26A ÆRMIT No: "1970870 API No: 50-029-21530-01 SEC 23, T11 N, R13E BP Exploration (Alaska) TREE = WELLHËAD = ACTUATOR = KB. ELEV = BF. ELEV = KOP= Max Angle = Datum MD = Datum TVD = 4" crvv FMC AXELSON 72.7' 42.42' 3400' 104 @ 11031' 10667' 8800'SS . D-26B Planned . 4-1/2" X-Nipple (3.813" ID) - 2200' MD 13-3/8" Shoe - 2701' MD / 4-1/2" x 1-1/2" MMG GAS LIFT MANDRELS ST MD TVD DEV TYÆ VLV LATCH PORT 4 Schlum SV 3 Schlum DMY 2 Schlum DMY 1 Schlum DMY 4-1/2", 12.6#, 13Cr, Yam-Top Tubing - 9766' MD Planned Perfs (4-112" Liner) at xxxx' MD TOW - 8320' MD Top of 7" Liner - 7901' MD BOT 7" Liner Top (6' TBS) - 8165' MD BOT 9-5/8" Whipstock (TOW - 8320' MD) -5/8" HES EZSV - 8340' MD TOC - -9580' MD (-250' Cement) 9-5/8" HES EZSV - 9830' MD I TOP OF 7" LNR H 9867' I ~19-5/8"CSG'47#' L-80, ID=8.681" H 10136' I 10066' -1 TOP OF 4-1/2" DRESSED STUMP (D16 RKB) 10128' I BKRIBPFISH(06/01/05). SOME JUNK REMAINING ON TOP OF IT (D16 RKB) -1DEPLOYMENTSLEEVE I -14-1/2" OTIS XA SLIDING SLY, ID = 3.813" X-Nipples (3.813"ID) - 9724' & 9678" MD BOT S-3 Packer - 9699' MD XN-Nipple w.HRC Plug - 9745' MD BOT 4-112" Liner Top 6' TBS - 9765' MD 7",26#, L-80, BTC-M, Liner - 9913' MD 4-1/2" WLEG - 9766" MD I ITOPOF2-7/8"LNRH 10157' 4-112", 11.6#, L-80, IBT-M Liner 12,626' MD Minimum ID = 3.725" @9745' M In 4" Tubing Tail 10701'-10738' -1 BLAST JOINTS I 10739' HBKR K-22 ANCHOR I 10741' -17"X4-1/2"BKRPKR,ID=4.00" 10746' -14-1/2" OTIS XN NIP, ID - 3,725" I 14-1/2" TBG, 12.6#, L-80, .0152 bpf, ID = 3,958" 10749' 10749' -14-1/2" BKR TBG TAIL, ID = 4.00" I 10765' H ELMD TT LOGGED 02/09/861 ÆRFORA TION SUMMARY REF LOG: SÆRRY SUN GR/ROP 06/03/97 ANGLEATTOPÆRF: 101 @ 11150' Note: Refer to Production DB for historical perf data SIZE SPF INTERV AL Opn/Sqz DA TE 1-2/3" 4 11150 - 11285 Aban ? 1-2/3" 4 11950 - 12080 Aban ? 1-2/3" 4 12340 - 12390 Aban ? 4" 4 10730 - 10750 S 1997 2-7/8" 6 ?-? Open ? 1 PBTD 1 MILLOur WINDOW 10808' - 10816' - Abandon Perf's -11,150' -12,390' MD I CEMENTED WHIPSTOCK 17" LNR, 26#, L-80, .0383 bpf, ID = 6.276" 1 12-7/8" LNR, 6.16#, L-80, .0058 bpf, ID = 2.37" DA TE REV BY COMMENTS 02/12/86 ORIGINAL COMPLETION 04/07/89 DFF RWO 06/17/97 WHITLO SIDETRACK COM PLETION 06/01/05 JDM/TLH RWO SUSPENDED 03/05/02 RNlTP CORRECTIONS 04/26/05 NBF/TLH CHEM cur (04/08/05) DATE REV BY COMMENTS PRUDHOE BA Y UNIT WELL: D-26A ÆRMIT No: "'1970870 API No: 50-029-21530-01 SEC 23, T11 N, R13E BP Exploration (Alaska) I PRUDHŒ aL PB_LD &J 5 0..5 QI Rate (ŒH IVR:Jbl/d ) 0.1 0.05 0.,0.1 1997 01 03 04 O!te '~iJ~rŒ ) ~~ ~ r-c ~ ~'1~' ~ [ n I' I I I j I ¡ I ' (i' I i ,(',I i¡ : lUll [: ;8\ i i ,,!fi',\ :~'<'\:., III!;' , ",8"~ ~~ i Uu l"Slru æJ ì\ 'I '. ) ALASKA OIL AND GAS CONSERVATION COMMISSION l / / FRANK H. MURKOWSKI, GOVERNOR 333 W. pH AVENUE, SUITE 100 ANCHORAGE, ALASKA 99501-3539 PHONE (907) 279-1433 FAX (907) 276-7542 David Reem Drilling Engineer BP Exploration (Alaska) Inc. P.O Box 196612 Anchorage, Alaska 99519-6612 ."A. ~'lð 1".,/v \~ ; Re: Prudhoe Bay D-26A Sundry Number: 305-137 SCAï\O~EJ.J JUN 1 ,~ 2005; Dear Mr. Reem: Enclosed is the approved Application for Sundry Approval relating to the above referenced well. Please note the conditions of approval set out in the enclosed form. Please provide at least tw~nty-four (24) hours notice for a representative of the Commission to witness any required test. Contact the Commission's petroleum field inspector at (907) 659-3607 (pager). As provided in AS 31.05.080, within 20 days after written notice of this decision, or such further time as the Commission grants for good cause shown, a person affected by it may file with the Commission an application for rehearing. A request for rehearing is considered timely if it is received by 4:30 PM on the 23rd day following the date of this letter, or the next working day if the 23rd day falls on a holiday or weekend. A person may not appeal a Commission decision to Superjøfèourt unless rehearing has been requested. .. c DATED this Yday of June, 2005 Encl. lj!J toJ2~06' \¡JGA- &1~/l.i~os ) STATE OF ALASKA· ) 1lJr7.J. £(2/5 ALASKA OIL AND GAS CONSERVATION COMMISSION ECE/VED APPLICATION FOR SUNDRY APPROVAL JUN 012005 20 MC 25.280 f~tas!<'r.r. n;~ J') I":' ,.., '" (;1 U ~ ¡ 1,.)1, t:~ oS'~ f",I"!"I' ,.' P , ., . I .... ~'i ,~, 1..!N:rrnî3S1on {~'flr,horage 1. Type of Request: o Abandon 0 Repair Well . 0 Plug Perforations 0 Stimulate o Alter Casing 0 Pull Tubing /' 0 Perforate New Pool 0 Waiver o Change Approved Program II Operation Shutdown 0 Perforate 0 Re-Enter Suspended Well o Other o Time Extension 2. Operator Name: BP Exploration (Alaska) Inc. 3. Address: P.O. Box 196612, Anchorage, Alaska 7. KB Elevation (ft): 4. Current Well Class: /' III Development D Exploratory D Stratigraphic D Service 5. Permit To Drill Number 197-087/' 6. API Number: /' 50- 029-21530-01-00 99519-6612 72.7' 9. Well Name and Number: D-26A / 8. Property Designation: 10. Field / Pool(s): Prudhoe Bay Field / Prudhoe Bay Pool ,; ,,',', pet: C!:g'"N''' ':;1:'"', ,W"'E' ,I: I;" :t¡"Ä'1\; I t)'I":"IIi\t..I,C!;llk'Ji~:¡"Åb\l, 'I, ,',',' ' ':" ,;<;",:' .';,' ',;'i'" 1'1 I "1,..1:; I" , : ~Î~\'-~, " I. ,1:.,:1' '. " :' ." ~,~ '~I~ I~~, '1,:1::1 I~'~ :"",~,~'~~I~,.,,~II~~I,~ J·:.I,':I"'II,I',I", ,1,.:.,1,1,,/ ',I, ,'!I '"y"',,, I ',', '10',/ .::.' ,; Total Depth TVD (ft): I Effective Depth MD (ft): Effective Depth TVD (ft): Plugs (measured): 9051 12415 9037 10110 Length Size , 'MD, TVD, , BU~st ADL 028284 11.'" Total Depth MD (ft): 12490 Casing' Structural Conductor Surface Intermediate Production liner Junk (measured): N/A Collapse liner 110' 20" 110' 110' 2709' 13-3/8" 2709' 2709' 4930 2670 10137' 9-5/8" 10137' 8478' 6870 4760 1203' 7" 9867' - 10808' 8282' - 8977' 8160 7020 2-7/8" 10157' - 12482' 8493' - 9050' 13450 13890 Perforation Depth MD (ft): Perforation Depth TVD (ft): Tubing Size: 10730' - 12390' 8919' - 9032' 4-1/2", 12.6# Packers and SSSV Type: 7" x 4-1/2" Baker packer; 9-5/8" x 4-1/2" TIW packer; 4-1/2" otis SSSV Nipple Tubing Grade: Tubing MD (ft): L-80 10749' Packers and SSSV MD (ft): 10741'; 9809' 2006' 12. Attachments: III Description Summary of Proposal D BOP Sketch D Detailed Operations Program 14. Estimated Date for Commencing Operations: May 31,2005 16. Verbal Approval: Date: 5/31/2005/ Commission Representative: Winton Aubert / 17. I hereby ce tf9that the foregoing is true and correct to the best of my knowledge. Printed Na e David R m () Title Drilling Engineer Signature (!/~ Phone 564-5743 Commission Use Only 13. Well Class after proposed work: D Exploratory III Development D Service 15. Well Status after proposed work: DOil DGas DWAG DGINJ / i;J4Ä'- ~ Plugged - DI--A6andoned D WINJ D WDSPL Contact David Reem, 564-5743 Date G/I/2co S· Prepared By Name/Number: Terrie Hubble, 564-4628 Conditions of approval: Notify Commission so that a representative may witness I Sundry Number: 3CJ~-- I 37 D Plug Integrity D BOP Test D Mechanical Integrity Test D Location Clearance RBDMS BFl .IUN 0 ~ 7005 Other: Approved By: Form 10-403 Revi ed f=oll;V'- Jð R î" G I [\} Ã[ J jç r t~t.,; t ''Pr.- P'l," S . APPROVED BY THE COMMISSION COMMISSIONER Date ç ~ Ibs s"m:-~ D~Plicate SubsequentFormR ) ) D-26A Proposed Abandonment Current Status: Doyon 16 currently rigged up on the well ready to suspend workover ~ operations. Plan Forward: 1) Pressure up on well and check for injectivity - done. Pressured well to 2000 psi. Lost 1000 psi in 15-minutes. Could not sustain injection rate at 2000 psi. /' Injectivity too small to measure with rig pump. 2) Set 9-5/8" EZSV bridge-plug on drill-pipe at 9830'md. PT plug at 1500 psi for 30-min. POR and LDDP. 3) Set 2nd 9-5/8" EZSV at ~3000'md on drill-pipe and LD remaining DP. 4) Run 4-1/2", 12.6#/ft, L-80 kill string to ...2500'md. Place "X" profile nipple ~20' up from WLEG. 5) Set and test TWC. 6) ND BOPE. 7) NU'and test tree to 5000 psi. ' 8) Pull TWCw/lubricator. Set BPV. RDMO to J-18. I /", Verbal. approval of this plan forward grantêd by Winton Aubert of the AOGCC 5/31/2005. Plans are to sidetrack this well back into the Ivishak formation TREE = WELLHEAD :! 'ACT.uÄTÖR:::~ KB. REV = SF.EfE\! ;, KOP= .",,,,,,,, "" " ,,,.,,,,,,,,,, "". Max Angle = Datum MD = OaiumTVÖ::: ' 4" CrN FMC AXELSON 72.1' 42.42' 3400' 104 @ 11031' 10661' ··s8òÒiSs ) 113-318" CSG, 72#, L-80, ID = 12.347" l-i 2707' Minimum ID = 2.37" @ 10157' TOP OF 2-7/8" LINER I TOP OF 7" LNR l-i 9867' I 9-5/8" CSG, 47#, L-80, ID = 8.681" l-i 10136' TOPOF 2-7/8" LNR l-i 10157' 14-1/2" TBG, 12.6#, L-80, .0152 bpf, ID = 3.958" l-i 10749' I ÆRFORA TION SUMMARY REF LOG: SPERRY SUN GR/ROP 06/03/97 ANGLEATTOPÆRF: 101 @ 11150' Note: Refer to Production DB for historical perf data SIZE SPF INTERV AL Opn/Sqz DA TE 1-2/3" 4 11150-11285 0 06/16/97 1-2/3" 4 11950 - 12080 0 06/16/97 1-2/3" 4 12340 - 12390 0 06/16/97 4" 4 10730 - 10750 0 1 CEMENTED WHIPSTOCK l-i 10765' 1 PBTD l-i 11026' I 7" LNR, 26#, L-80, .0383 bpf, ID = 6.276" l-i 11068' DA TE REV BY COMMENTS 02/12/86 ORJGINAL COMPLETION 04/07/89 DFF RWO 06/17/97 WHrrLOW SIDETRACK COMPLETION 03/04/02 RN/TP CORRECTIONS 08/27/04 JLJITLP GLV C/O 01/19/05 lDKlPJC IBP D-26A e ~ ~ L /VV ! \ I I z :g /VV' _ I. ... - ... ... I . 1I 1I 0 ~ ~ I I I ) SAl-ETY NOTES: 70° @ 10939' AND 90° @ 10995' 2006' 1-i4-1/2" OTIS SSSV NIP, ID = 3.813" I GAS LIFT MANDRELS DEV 1YÆ VLV LATCH 5 CAMCO DMY RK 50 CAMCO DMY RK 43 CAMCO DMY RK 41 CAMCO DMY RK 45 CAMCO DMY RK ST MD TVD 5 3015 2942 4 5723 5255 3 7856 6702 2 9188 7714 1 9769 8139 PORT DATE o 08/27/04 o 08/27/04 o o o 9746' l-i CHEM CUT (04/08/05) I 9787' 1-i4-1/2" SWS X NIP, ID = 3.813" I 9794' I-iTBG SEAL ASSY I 9809' l-i 9-5/8" X 4-1/2" TrN PKR, ID = 4.0" I 10082' l-i CHEM CUT (04/07/05) I 110110' ELM l-i BAKER 3" IBP 1/19/05 10157' I-iDEPLOYMENT SLEEVE I 10676' 1-i4-1/2" OTIS XA SLIDING SLV, ID = 3.813" 110701'.10738'1-i BLAST JOINTS I 10739' l-i BKR K-22 ANCHOR I 10741' I-iT' X 4-1/2" BKR PKR, ID = 4.00" I 10746' 1-i4-1/2" OTIS XN NIP, ID = 3.725" I 10749' 1-i4-1/2" BKR TBG TAIL, ID = 4.00" I 10765' l-i ELMD TT LOGGED 02/09/86 I MILLOUT WINDOW 10808' - 10816' 1 PBID l-i 12415' 1 2-7/8" LNR, 6.16#, L-80, .0058 bpf, ID = 2.37" l-i 12482' I DA TE REV BY COMMENTS 04/26/05 NBFITLH CHEM CUT (04/08/05) PRUDHOE BAY UNrr WRL: D-26A PERMrr No: "1970870 APt No: 50-029-21530-01 SEC23, T11N, R13E BP Exploration (Alaska) TREE = WELLHEAI~ ~ """."",,,,,,,,,, . AG'i'UA TOR =,. KB. ELEV = äF~'ÊlEt..,;···· KOP= 'MaxÄngle; Datum MD = Datum ND = 4" CrN FMC AXELSON 72.7' ...........", '·4~Di2i 3400' 1Ó4 @11Òà1i 10667' 8800' SS ) D-24A Proposed ') 113-3/8" CSG, 72#, L-80, ID = 12.347" 1-1 2707' Minimum ID = 2.37" @ 10157' TOP OF 2-7/8" LINER I TOP OF 7" LNR 1-1 9867' 19-5/8" CSG, 47#, L-80, ID = 8.681" 1-1 10136' 14-1/2" TBG, 12.6#, L-80, .0152 bpf, ID = 3.958" 1-1 10749' 1 ÆRFORA TION SUMMARY REF LOG: SÆRRY SUN GRlROP 06/03/97 ANGLEATTOPÆRF: 101 @ 11150' Note: Refer to Production DB for historical perf data SIZE SPF INTERVAL Opn/Sqz DATE 1-2/3" 4 11150 - 11285 0 06/16/97 1-2/3" 4 11950 - 12080 0 06/16/97 1-2/3" 4 12340 - 12390 0 06/16/97 4" 4 10730-10750 0 1 CEMENTED WHIPSTOCK 1-1 10765' I PBTD 1-1 11026' I 7" LNR, 26#, L-80, .0383 bpf, ID = 6.276" 1-1 11068' DA TE REV BY COMMENTS 02/12/86 ORIGINAL COMPLETION 04/07/89 DFF RWO 06/17/97 WHITLOW SIDETRACK COMPLETION 03/04/02 RN/TP CORRECTIONS 08/27/04 JLJITLP GLV C/O 01/19/05 LDKlPJC IBP ~ } ~ I 2510' 2522' 3025' 1-14-1/2" HES "X" NIP, ID = 3.813" 1-14.5" WLEG, 4.950" OD l-i 9.625" Halliburton EZSV 1/ 1 1 ~/ 9830' l-i 9.625" Halliburton EZSV 1 /" . ~ Ii ~ I I II II 0 8 8 I I I 10157' 1-1 Failed Baker 3.0" IBP, sitting on liner top 1 I 10157' I-iTOPOF 2-7/8" LINER 1 1 10676' 1-14-1/2" OTIS XA SLIDING SLV, ID = 3.813" 110701'-10738'1-1 BLAST JOINTS 1 10741' 1-17" X 4-1/2" BKR PKR, ID =4.00" 1 10746' 1-14-1/2" OTIS XN NIP, ID = 3.725" 1 10749' 1-14-1/2" BKR TBG TAIL, ID = 4.00" 1 10765' 1-1 ELMD TT LOGGED 02/09/86 1 MILLOUT WINDOW 10808' - 10816' I PBTD 1-1 12415' I 2-7/8" LNR, 6.16#, L-80, .0058 bpf, ID = 2.37" 1-1 12482' I DA TE REV BY COMMENTS PRUDHOE BA Y UNIT WELL: D-26A ÆRMIT No: 1970870 API No: 50-029-21530-01 SEC 23, T11 N, R13E BP Exploration (Alaska) Schlumberger Alaska Data & Consulting Services 2525 Gambell Street, Suite 400 Anchorage, AK 99503-2838 A TIN: Beth Well í crt> -17:}. D.S. 5-39 /l7-tß7 D-26A Job# 10991755 10964114 SCANNED JUN 1 7 2005 Log Description LEAK DETECTION LOG LEAK DETECTION LOG PLEASE ACKNOWLEDGE RECEIPT BY SIGNING AND RETURNING ONE COPY EACH TO: BP Exploration (Alaska) Inc. Petrotechnical Data Center LR2-1 900 E. Benson Blvd. Anchorage, Alaska 99508 Date Delivered: ß/z{o~ Date 01/24/05 01/19/05 Blueline 1 1 /?7-0?7 02/25/05 NO. 3350 Company: State of Alaska Alaska Oil & Gas Cons Comm Attn: Helen Warman 333 West 7th Ave, Suite 100 Anchorage, AK 99501 Field: Prudhoe Bay Color Prints CD -~ -~/ Alaska Data & Consulting Services 2525 Gambell Street, Suite 400 Anchorage, AK 9950~-28 ~ r~ ATTN: Beth / t;, j _ Recei6JMrj f:ú#f~ D-26 (PTD #1970870) Classified as Problem Well ) Subject: D-26 (PTD #1970870) Classified as Problem Well From: "NSU, ADW Well Integrity Engineer" <NSUADWWelllntegrityEngineer@BP .com> Date: Sat, 21 Aug 2004 20:49:32 -0800 ) All, Well D-26 (PTD #1970870) has been found to have sustained casing pressure on the IA. The TIO's on 08/21/04 were 2320/2300/330 after a TIFL was performed today. The plan forward for this well is as follows: 1. DHD: TIFL - FAILED 2. SL: DGLVs 3. DHD: Re-TIFL A wellbore schematic has been included for reference. , «D-26A.pdf» The well has been classified as a Problem well. Please call if you have any questions. Thanks, Donald Reeves - Filling in for JOE ANDERS Well Integrity Engineer 907-659-5102 907-659-5100 #1154 pgr Content-Description: D-26A.pdf Content-Type: application/octet-stream Content-Encoding: base64 SCANNED NOV n 2 2004 I of I 8/24/2004 11: 16 AM ) TRæ= WELLHEAD = A CTUÄ fÓFf~". KS. ELEV = ëF:.ELEV = KOP=. . . M.:\X Angle = b:i1uM.Nï>.;;;. . DiltumTVD= 4" G rvv FMG .."'.ÄXELSON .. 72:1' 42.42' .3400" 104@ 11031' ........ ".."."'."'.1Dëi6i" saUO' S S 11~-3¡a1l CSG, 7'l:#. L-a!}, ID = 12.347" 1-1 2707 Minimum 10 = 2.37" @ 10157' TOP OF 2-7/811 LINER 1 TOP OF 7" LNR 1-4 9867 19-5/fJ' CSG, 47#, L-aO,ID = 8.681" 1-1 10136' ITOPOF2-718" LNR 1-1 10157' 141/211 18G. 12.6#. L-60. .0152 bpf. () = 3.lì5a" 1-4 10149' 1 PffiF ORATION SUMMA. RY REF LOG: SPffiRY SUN GRlROP06103I97 ANGLEATTOPPERF: 101 @ 11150' Note: Refer to Ptoduc:1ion DB for histariC:<l1 perf data SIZE SPF INTERVAL Opn/Sqz DATE 1-213" 4 11150 - 11285 0 06/16/97 1-~3" 4 11950 - 120aa ú 06/16"'7 1-213" 4 12340 - 12390 0 06/16/97 4' 4 1!}730 - 10750 0 1 10765" 1-1 CEMENTED WHIPSTOCK 1 PBTD H 11026" 1 7" LNR, 26#. L- 80, .0383 bpf. ID = 6.'Z76" H 11Q68' DA TE REV BY CO Mv1EN TS Q2/12/Ba ORI~INAL CO~LETION Q4/07 Jag DF F RW 0 Oe/17197 WHrrLOW SIDETRACK CDMPLE110N 02109101 SIS-SLT CONVERTED TO CANVAS 031D8ID1 S IS- MD FINAL D-26A e ~ L , ¡ :8: 1 1i ~ 1 :8:,. I ... I . 1I 1I [] [l 0 8 I 8 I 1 ) I SAFETY NOTES: 708@ 10939' AND 906@ 10995' 2006' H41/2" OTIS SSSV NIP. ID = 3.913" 1 ~ ST IvD TVD 5 3015 2942 4 5723 5255 3 78&3 ð7D2 :2 Q188 7714 1 9769 8139 ()A S LIFT Mð. ND R ELS DEV TYÆ VLV LATCH 5 CAMeO RK 50 CAMeO RK 43 CAMeO RK 41 CAMeO Rk 45 CAMeO RK PORT DATE 9787" H4112" SWS X NIP, ID = 3.B13" 1 9794' H 18<7 Sl=ALAS5Y 1 9809' H9-6/S" X4-112" TIW PKR, D =4.0" I 10157" H DEPLOYMENT SLEEVE 1 I 10676' H41t2" OTIS XA SUDIN~ SLV, ID = 3.813" 10101'-107Ja"I.,BLAST JOINTS 1 I 10739' H BKR K-22 ANCHOR I I 10741' H7" X4-1/2" BKR PKR, ID =4.00" 1 10746' H41t2" OTIS XN NIP, ID = 3.725" I 10749" H41/2" BKR TB() TAIL, ID = 4.1}O" I 10765' H ELt./D TT LO GG ED 021091861 MLLO UT WINDOW 1QSD8' - 10816' 1 PBTD H 12415' 12-718" LNR.6.16#, L-SlJ, .0058 bpf, D =2.37" H 12482' 1 DA TE REV BY COMMENTS 03J04'û2 RN/1P C ORREC 110 NS PRUDHOE BAY UNIT WELL.: (). 26A PERMIT No: 1Q7-0S70 API Nt': 5O-029-21530-D1 SEC 23. T11 N. R13E BP Exploration jAlaska} MEMORANDUM State of Alaska Alaska Oil and Gas Conservation Commission TO: THRU: Julie Heusser, Commissioner Tom Maunder, P. I. Supervisor DATE: April 20, 2001 FROM: Chuck Scheve; SUBJECT: Petroleum Inspector Safety Valve Tests Prudhoe Bay Unit D Pad Friday, ADri! 20, 2001: I traveled to BPXs D Pad and witnessed the semi annual safety valve system testing. As the attached AOGCC Safety Valve System Test Report indicates ! witnessed the testing of 20 wells and 40 components with 1 failure. The surface safety valve on well D-06 had a slow leak when pressure tested. This valve was serviced and the retest witnessed on this date. Merv Liddlow performed the testing today; he demonstrated good test procedures and was a pleasure to work with. A walk through inspection of the well houses on this pad was performed during the SVS testing with no problems noted. All well houses inspected were reasonably clean and all equipment appeared to be in fair conditions. Su. mmary; I witnessed the semi annual SVS testing at BPXs D-Pad. PBU D Pad, 20 wells, 40 components, 1 failure 2.5% failure rate 25 wellhouse inspections Attachment: SVS PBU D Pad 4-20-01 CS X Unclassified Confidential (Unclassified if doc. removed ) Confidential SVS PBU D Pad 4-20-01 CS Alaska Oil and Gas Conservation Commission Safety Valve System Test Report Operator: BPX Operator Rep: Merv Liddelow AOGCC Rep: Chuck Scheve Submitted By: Chuck Scheve Field/Unit/Pad: Prudhoe/PBU / D Pad Separator psi: LPS 154 Date: 4/19 & 4/20 HPS 660 Well Permit Separ Set L/p Test Test Test Date on, WAG, aI~J, Number Number PSI PSI TAp Code Code Code Passed GAS or CYCLE D-01A 1970780 154! 125 125 P P " OIL D-~3A 2001340 154 125 125 P P .... OIL D-04A 187i250 D-05 1700060 660 550 450 P P 'OiL D-06A 1970430 660 550 600 p 4 OIL D-07A 1931570 660! 550 525 ' P P " 4/20/0'1 oIL D-08 1790360 D-09A 1990850 660 550 52~ P 'P OIL D-10 1790530 660 550 525 P e ' OIL D-11A 1951830 660 550 525 P P OIL D-12 1800150 660 550 530 P P OIL] , , ., D-13A 2000810 D-14A 1961530 , D-15A 1972120 D-16 1811710 660 550 500 P P OIL D-17A 1960460 ,,, D-18 '1811880 D-26 1820440 154 125 120 P P OIL .. D-21 1820520 154 125 125 P P OIL D-22A 1972040 D-23A 1961880 660: 550 '525 p p " oIL D-24 1852990 , D-25A 2000240 154 125 100 P P OIL D-26A 1970870 6'60 550 525 P P OIL ., D-27 1860330 660 550 550 P P oIL D-28A 1952130 ' 660 550 550 P P " OIL '~-29 1852530 154! 125 110 e P OIL ~-30 1960266 .... ,D-SiA 1960950 660! 550 556 P e OIL D-33 1960360 660 550 550 P P OILl , , , RJF 1/16/01 Page 1 of 2 SVS PBU D Pad 4-20-01 CS l" 'Well ' Permit-I $~par .... set~ '1 ' ~ ~"/':' ~s~t .... ' I Number Number/ es~ es~ I Trip ! C°de Wells: 20 Components: 40 Failures: Test Code 1 Test Date l Oil, WAC:, C:I~J, Code Passed I GAS or CYCLE Failure Rate: 2.50% F'lg0 Day Remarks: The surface. safety valve on well D-6 had slow leak when pressure, tested. Valve was serviced and retested same day RJF 1/16/01 Page 2 of 2 SVS PBU D Pad 4-20-01 CS ON OR BEFORE P M C:LOI~A~I~ILM. DOC Er P E RM I T DATA 97-087 BHC/GR 97-087 CN/GR 97-087 IND-E/GR 97-087 EOW SRVY 97-087 8101 97-087 NGP-MD 97-087 NGP-TVD 97-087 7840 AOGCC Individual Well Geological Materials Inventory T DATA PLUS ................ ~/110700-12478 ~/10700-12478 ~/10700-12478 ~/DRILLEX 10700-12490 ~SPERRY GR ~1o835-1249o ~T~%~4~M AC/CN/IEL/GR Page: 1 Date: 05/24/99 RUN RECVD 1 07/03/97 1 07/03/97 i 07/03/97 07/25/97 6-16 09/10/97 FINAL 09/17/97 FINAL 09/17/97 1 10/16/97 10-407 ~OMPLETIO~ DATE O ~#71~71 DA~LY WELL ODS ~O tT~0/~?/ TO &~? I~?1 Are dry ditch samples required? ye~~___And received? Was the well cored? yes ~Analysis & description received? Are well tests required?/ /~es Well is in compliance Initial CO~ENTS T D BOX .... HOWARD OKLAND Attn. ALASKA OIL & GAS CONSERVATION 3001 PORCUPINE DRIVE ANCHORAGE AK, 99501. U.S.A. Dear Sir/Madam, Reference: D-26A PRUDHOE BAY NORTH SLOPE, AK Enclosed, please find the data as described below: Tapes/Diskettes: 1 LDWG TAPE & LISTER Date: RE: 26 September 1997 Transmittal of Data ECC #: 6862.00 Sent by: COURIER Data: LDWG Run # 1 Please sign and return to: Attn. Glen Horel Western Atlas Logging Services 1200, 505 - 3rd Street S.W. Calgary, Alberta T2P 3E6 (~x Or FAX to (403) 571-1050 Received by: ~,_~~ Date: OCT I ~ 1997 Oil:Iii_lING S I:= F:I U~ I C I::: ~ WELL LOG TRANSMITTAL To: State of Alaska Alaska Oil and Gas Conservation Cormn. Atm.: Lori Taylor 3001 Porcupine Drive Anchorage, Alaska 99501 ~1/ MWD Formation Evaluation Logs D-26A, AK-MW-70153 September 17, 1997 The technical data listed below is being submitted herewith. Please acknowledge receipt by returning a signed copy of this of this transmittal letter to the attention of.' Jun Galvin, Sperry-Sun Drilling Services, 5631 Silverado Way, #G, Anchorage, AK 99518 D-26A: 2" x 5" MD Gamma Ray Logs: 50-029-21530-01 2" x 5" TVD Gamma Ray Logs: 50-029-21530-01 1 Blueline 1 Rev Folded Sepia 1 Blueline 1 Rev Folded Sepia 199 ? 5631 Silverado Way, Suite G · Anchorage, Alaska 99518 · (9.07) 563-3256 · Fax (907) 563-7252 A Dresser Industries, Inc. Company WELL LOG TRANSMITTAL To~ State of Alaska Alaska Oil and Gas Conservation Comm. Atm.: Loft Taylor 3001 Porcupine Dr. Anchorage, Alaska 99501 MWD Formation Evaluation Logs D-26A AK-MW-70158 September 10, 1997 The technical data listed below is being submitted herewith. Please acknowledge receipt by returning a signed copy of this transmittal letter to the attention of~ Ytm Galvin, Sperry-Sun Drilling Services, 5631 Silverado Way, ~G, Anchorage, AK 99518 1 LDWG formatted Disc with verification listing. APl#: 50-029-21530-01. R CEIVE[J 5631 Silverado Way, Suite G · Anchorage, Alaska 99518 · (9.07) 563-3256 · Fax (907) 563-7252 A Dresser Industries, Inc. Company STATE OF ALASKA · ALASK/ AND GAS CONSERVATION C- 'vllSSlON WELL COMPLETION OR RECOMP LETION E. PORT AND LOG GAS [] SUSPENDEB [] ABANDONED [] SERVICE [] Classification of Service Well 1. Status of Well 2. O~L [] Name of Operator BP Exploration 3. Address P. O. Box 196612, Anchoraqe Alaska 99519-6612 4. Location of well at su trace 1716' SNL, 1692' WEL, Sec. 23, T11N, R13E At Top Producing Interval 120' NSL, 365' WEL, Sec. 15, T11N, R13E At Total Depth 251' SNL, 2045' WEL, Sec.22, T11N, R13E 5. Elevation in feet (ind KBE=72.20 12. Date Spudded 5/30/97 17. Total Depth (MD+TVD) 12490, 8978' TVDss 22. Type Electric or Othe icate KB, DF, etc.) 6. Lease Designation and Serial No. 028284 13. Date T.D. Reached 14. Date Comp., Susp. or Aband. 6/12/97 16/17/97 18. Plug Back Depth (MD+T VD) 19. Directional Survey 120. 12482, 8977' TVDss YES [] NO [] I r Logs Run BHCS / IND / CNL / GR 7. Permit Number 97-87 8. APl Number 50- 029-21530-01 9. Unit or Lease Name Prudhoe Bav Unit O. Well Number D-26A 1. Field and Pool Prudhoe Bay Field/Prudhoe Bay Pool 15. Water Depth, if offsh ore i16. No. of Completions I n/a feet MSL I one Depth where SSSV set 21. Thickness of Permafro st 2006 feet MD alaprox 1900' 23. CASING SIZE 2-7/8" WT. PER FT. 6.16# GRADE L-80 24. Perforations open to Production (MD+TVD of Top interval, size and number ) 11,950-12,080 8931-8937, 1-11/16" 4spf 12,340-12,390, 8950-8959, 1-11/16" 4spf 11,285-11,150, 8924-8950, 1-11/16" 4spf CASING, LINER AND CEMENTING RECORD SE'I-I'ING DEPTH ME: TOP BOTTOM HOLE SIZE 10,257 12,482 3-3/4" and Bottom and CEMENTING RECORI' AMOUNT PULLED 95 c.f. 25. TUBING RECORD SIZE DEPTH SET (MD) PACKER SET (MD) 26. ACID, FRACTURE, CEMENT SCUEEZE, ETC DEPTH INTERVAL (MD) I AMOUNT & KIND OF MATERIAL USED 27. PRODUCTION TEST Date First Production ing, gas lift, etc.) 6/24/97 Date of Test Hours Tested Method of Operation (Flow FL PRODUCTION FOR OIL-BBL TEST PERIOD I~ CALCULATED . O L-BBL 24-HOUR RATE I~ Flow Tubing Press. 28. Casing Pressure GAS-MCF WATER-BBL ICHOKE SIZE GAS-OIL RATIO OIL GRAVITY-APl (corr) GAS-MCF WATER-BBL CORE DATA Brief description of lith ology, porosity, fracture s, apparent dips, and pre sence of oil, gas or wate r. Submit core chips. ORIGINAL Form 10-407 Rev. 7-1-80 CONTINUED ON REVERSE SIDE Submit in duplicate . ?.fask_a 0ii & 6as Cons, C0rnrnissioi~ Anchorage 29. 30. GEOLOGIC MARKER" 'tMATION TESTS · NAME Include interval tested, pressure data, all fluids recovered and gravity, MEAS. DEPTI- TRUE VERT. DEPTP GOR, and time of each pha se. 25N 10845 8855 25P 10873 88 70 31. LIST OF ATTACHMENTS 32. I hereby certify that the foregoing is true and co rrect to the best of my k nowledge Signed '~~'_(~:::~,~ ~ Title ~,~ilTt,hin~l')rillin_qT,~ Date "7~]q"~ INSTRUCTIONS General: This form is des all types of lands and le Item 1' Classification of water disposal, water sup igned for submitting a co ases in Alaska. Service Wells: Gas injec ply for injection, observ mplete and correct well c tion, water injection, st ation, injection for in-s ompletion report and log on eam injection, air inject ion, salt itu combustion. Item 5: Indicate which el evation is used as refere nce (where not otherwise given in other spaces on this form and in any atta chments. shown) for depth measurem ents Item 16 and 24: If this completion), so state in in item 27. Submit a sep data pertinent to such in well is completed for sep item 16, and in item 24 s arate form for each addit terval. arate production from mor how the producing interva ional interval to be sepa e than one interval (mult iple Is for only the interval reported rately produced, showing the Item 21' Indicate whether from ground level (GL) o r other elevation (DF, KB , etc.). Item 23: Attached supplem ental records for this we ing and the location of t he cementing tool. II should show the detail s of any multiple stage c ement- Item 27: Method of Operat jection, Gas Injection, S Item 28: If no cores take Form 10-407 ion' Flowing, Gas Lift, R hut-in, Other-explain. n, indicate "none". od Pump, Hydraulic Pump, Submersible, Water In- P~as C0~]S. ¢..jorP, l~issi~fi Anchorage Well: D~26A Accept: 5/29/97 Field: Prudhoe Bay Spud: 5/30/97 APl: 50-029021530-01 Release 6/16/97 Permit 97-87 CTD Unit: Nordic #1 Date Day Depth 5/30/97 1 10779 Accept rig at 1200 hrs on 5/29/97. Grease tree. Flange up to swab valve with rig BOPE. Spot tanks. R/U hardline. Fill rig pits with seawater. Service injector head. Perform initial BOPE pressure and function tests witnessed by AOGCC. MU BHA. RIH w/BHA #1. Tie into BHCS at 10409' subtract 12'. Precautionary ream to bottom. Mill thru XN and firm cement to 10765' at 82R. Turn TF to Iow side and ream thru XN and drill soft cement stingers to 10779' Having trouble keeping TF down. Backream. 5/31/97 2 10808 Finish backream. Orient to Iow side. Drill pilot hole from 10779 - 10797 ft. Orient to high side and drill to 10,808 ft. Tag liner with mill. POOH and pick-up Drilex Window motor with 3.0 deg. bend and 1.5 deg. bent sub. M/U Chris one step diamond mill and RIH with BHA ¢~2. Noticed pinhole leak in CT at 8730'. Backup spool in Fairbanks with E-line installed. Prep to field weld CT. Safety meeting. Position CT to remove high use area of CT. Set combo rams. Pull up injector. Cut CT. Cut off 350' of CT. Splice with internal connector. Pull test above string weight. Install injector. Open combo rams. POOH with fresh CT and allow slack between injector and reel. Open pipeshed roof. Set welding jig with 90T crane on catwalk. Install slack CT in jig. Cut out internal connector. Prep to begin welding. 6/1/97 3 1O8O8 Begin welding CT with DS welders. CTI Inspected first weld. First weld failed. Cut and re-weld. CTI inspected second weld. Second weld failed. Cut and re-weld with VECO welder. Cut out welded section and test. Third weld failed. Determine that magnetism due to 460,000 RF won't allow bead to penetrate enough to pass X-Ray. Magnetism is substantially less 5' away from each end. Safety meeting. Cut off 8' on reel side and 15' on injector side. Welders set up for fourth weld. Begin welding. 6~2~97 4 10821 Begin welding CT (fourth attempt). Inspected weld. Weld #4 passed. R/D welding jig. Close roof on pipe, shed and connect guy wires. Pull weld onto reel, spool out and check weld, OK. RIH with milling BHA. TiLex, in to GR. Orient to Iow side to get in pilot hole. Orient to high side and tag liner at 10809.5'. Begin time ~ , drilling per procedure. Top of window at 10811.5', bottom of window at 10816.3'. Drill open hole to 10821'. ",..J Displace SW in system to used FIo Pro while time backream from 1' below window. 6~3~97 5 1O822 Continue timed backream from 1' below window to top of window. RIH and pull thru window twice with no drag. POOH. Layout 2 DC's, XO's, Motor and mill. Change out Sperry MWD tools. M/U tandem bent motor and Bit #1. Pump 15/16" ball thru CT to drift CT butt weld. RIH with directional building BHA. Tie-in with flag. RIH and tag TD at 10821 ft. Attempt to drill build section. BHA is stacking in window, no torque on motor, just stacking wt. Work BHA, no progress POOH. Outside cutters of bit were gone. RIH w/BHA #4 (3.8" pilot mill). Orient to high side in tubing tail. RIH, clean. Set down and dress bottom of window at 10816'. RIH to TD. Unable to make progress past 10822'. Mills like junk. POOH for a more suitable mill. LD pilot mill. PU One Step Mill (3.8" flat bottom). RIH with BHA #5. 6/4/97 6 10880 Continue RIH w/BHA #5 (3.8" flat bottom dia mill). Tie-in to flag from last run. Tie-in with GR. Drill from 10822 - 10835 ft. POOH. RIH with 2.8 deg bent motor and Bit #2. Tie-in with GR. RIH easy thru window. Clean bottom. Drill build section from 10835 - 10880'. Began getting metal shavings fron top drive motor. POOH to repair/replace top drive motor. Purge CT w/N2. RU crane to change out CT reel. Changing out Top Drive motors. 675197 ? 1 O88O Remove Tioga air heater from rig with crane. Pick worn CT reel with Crane. Install top drive to injector head. Machine reel support pin bushings to fit reel and support pins. M/U guide arch on injector head. Set new reel of CT onto reel stand. Stab CT into injector head. M/U CT connector and pull test. Fill Ct w/FIo-Pro and pump dart. Pressure test CT connector to 4500 psi. MU BHA. TIH. Tagged up on GLM #1. Orient to pass. Sheared bolt in chain tensioner block. Repair. 6/6/97 8 11070 Repaired chain tensioner on injector head. RIH with building BHA. Tied-in with GR. Drilled build section from 10880 - 11002 ft. Short trip to window and re-orient TF. Drill build section from 11002 - 11031. POOH f/Sperry MWD tools. Change out Sperry tools, motor, and bit. TIH. GR log for correlation, drill to 11,070' 6/7/97 9 11310 Drill to 11085, Sperry MWD locked in Gamma loop. POOH, change out Sperry tools. TIH and re-survey across drilled interval. Drill to 11310', bit balled up. POOH, change out bit. TIH. 6~8~97 10 11552 RIH with directional BHA. Tie-in with GR. Drill horizontal hole from 11310 - 11461 ft BKB. Short trip to window. Drill horizontal hole from 11461 - 11537 ft CTD. POOH. Flag CT at 10,720 ft. POOH. PU 0.75° motor, change out Sperry tools. TIH. Displace hole w/new FIo-Pro. Losing pump pressure, unable to get motor differential. POOH to check BHA.. 6/9/97 11 11880 Inspect BHA #11, no leaks, Change out motor, bit, and MWD. Press test BHA #12. RIH with new bit, motor and MWDTied in with flag. Drill horizontal hole from 11552 - 11724 ft, Short trip to window, Tie-in with GR. RIH to TD. Unable to get TF, Sperry tool stuck in Gamma loop. POOH due to MWD failure. Change out Sperry probe, change bits, TIH. GR log for correlation. 6/10/97 12 12210 Drilled horizontal hole from 11880 - 12032 ft. Slow drilling near end, Tool Face kept shifting. CT sliding to TD OK, but stacking WOB to get any ROP. POOH for worn bit. Change out motor, bit and cut off 20 ft of CT. Rehead. M/U Sperry tools. RIH. GR log for correlation. Drill to 12,210' 6/11/97 '13 12380 Drill horizontal hole from 12210 - 12253 ft. POOH for a new bit. Change bit, Sperry orientor and directional tools. RIH with Bit #9. Correct depth at Flag. Tie-in with GR. RIH and drill horizontal hole from 12253 - 12380. Bit quit drilling. POOH, change out motor. TIH 6/12~97 14 12490 RIH with Bit #9. Reamed shales 100 ft above TD. Drilled horizontal hole from 12380 - 12490 ft BKB. Short tripped to window. Tied-in with GR. RIH and tagged final TD at 12,490 ft BKB. POOH. Hole is clean. Lay down drilling BHA. Lay down off drillers side wind wall. R/U DS service 1.75" CTU for Open hole logging. 6/13~97 15 12490 Finish injector head rigup. Held safety meeting with all day personnel. Function test BOPS, Test E-Line. Test CTU Collector, found one short. DS Elec Techs repaired shorted collector. M/U Atlas open hole logging BHA. Displace CT to Filtered Seawater. Press test BOPS / Lubricator. CT pack-off leaked. Repair CT Pack-off. Held Safety meeting with night personnel. RIH with Atlas BHCS / IND / CNL / GR. Log. POOH, 6/14~97 16 RID Atlas logging tools. Held Safety meeting with all personnel. RID hydraulic hoses. Pick injector head, CT BOPS and man basket with Peak 140 ton crane. Pick up CTD injector head with blocks. M/U Bit #7RR, straight motor and DS BHA. RIH with BHA#17 to condition hole. Ream shale section from 12,320 - 12,360 ft. Ream to TD of 12,483 ft BKB. POOH. Prepare to run liner. RIH with 73 its, 2 7/8", 6.16#, STL liner. Run 1 ¼" CS Hydril cement string. TIH w/liner.; Tag bottom, pump ball to release CTLRT. Pump cement. NOTE***Liner 1' off bottoms 6/15/97 17 Displace 17 BBLS, G cement with Flopro, Dart on seat at 57.3 BBLS. Shear dart seat and flush liner. Park stinger above liner top and WOC. DS lab called when cement at 100 PSI. DS lab UCA sample slow to set up, RIH and jet liner. Spot hi vis FIo-Pro in liner. POOH. PU SWS I 11/16" per guns, TIH. Position bottom shot at 12390'. Drop firing ball. 6/16197 18 Pump ball on seat to fire per guns, Run #1. SWS firing head sheared at 4950 psi. POOH. Flag CT at 11602 ft for next per gun run. POOH. Found top gun had fired Iow order and next 9 guns were flooded [not fired]. Apparent O-Ring failure. Load replacement per guns. RIH with PeR guns, Run #2. Deploy guns on CSH workstring. Position bottom shot at 12390'. Drop ball and fire guns. POOH, LD guns, all shots fired. Perforated interval 11950'-12080' and 12340'-12390', using SWS I 11/16" gun, 4 SPF, 20J UJ 3.2 gram charge. PU guns for per run #2. TIH. 6/17/97 19 RIH with peRgun BHA#3. Stop at flag. Pump 5/8" ball. PeRorate 11,285- 11,150 ft BKB. POOH. Lay out CSH string in singles for derrick down rig move. Recover per guns, all shots fired. RIH with remaining stands of CSH string and lay out in singles. RIH with nozzle on CT to 10000 ft and recover FIoPro from well. POOH. Freeze protect Tubing from 1500 ft to surface. Wash tree and BOP stack. Purge coil w/N2. Unstab CT from injector head and set back. Clean pits and ND BOP. .... RELEASE RIG AT 2400 HR 6116197 .... 1 -26aeow.×,s D-26 A END OF WELL SURVEYS ''-'7 7/:3/97 12:51PM BP EXPLORATION ALASKA INC. END OF WELL SURVEY REPORT FOR THE D-26 A July 4, 1997 VERTICAL SECTION USED · 248.58° Relative to TRUE NORTH ;;::.;2L-.'-J ::;.: ;_-7;;;-2_ ........- ;'-:'; :' !;;2:;-;'2L.-_-. ;:ii;;';:;:;:::i'_;:2222';;;; :::::::::::::::::::::::::::::::::::::::::::::::::: NOTE ' GRID N/S AND ENV OFFSETS ALSO GRID ASP X AND Y ARE RELATIVE TO GRID NORTH · GRID N/S AND ENVOFFSETS ARE REQUIRED FOR GEOLOGICAL WORK ' OFFSETS ARE CALCULATED TO GRID AND TRUE NORTH AS INDICATED GRID 'cONVERG'ENCE ~NETIC DEC. TO TRUE NORTH · 28.42° ._~:~'~,-i~'6 -'[~'~"i- ...................................................................................................................................................................................... I DIRECTIONAL CO. ' DRILEX SYSTEMS, IN.C:~ MWD CO. ' SPERRY SUN ................................................................................................................................................................................................................................................... I , ~'OM~'i~'~fS' ~'i5 i,:,;~: 6[~:'i'"-~-6-E-~¥i:l- .................... ~'~ .......... ':f~-i~-E .............. 'i'-~U-[- ............ -E~,~i;:i ............... :f',-,:~ ........... 6~;;ji;;j .............. -6-~ii5 ................. a'i~[6 A~'~"-'~ ........................... .~'§'P'~X ~l:.A(~tua!.SvY.~Tie In_ !.0700.00 ~42.:~0 :311.841 8824.'10 0.00 2001.20' -4153.10 0.00 0.00 0.00 1916.00 -4193.10 5961i89.00,' 649271.00 2. KOP 10816.00 42.23 3"~ 2.84 8'909.9~ 34.50 2053.70: :42i0:80 -01i0 0.90 ! 0160 1967:40 :'42'51~80 59612~0:'~0 64-92i'~i~0 10845.50 .......... ~2-5~ 300.34 8929.80 46.20 ....... 2'~."-5~~, -4228.30 ........... ~:':~J ............... :4':~-:'~- ................ 'Z~'8-~-~(~ ........ i-~:~'[~ ...... --4'~'~-~'.-~)- ................. '5-~'i"~-~.~'~)- ................... ...................................................................................................................................................................................................... ~'~)~2-~'~-~ ............ 5-9~6--5 ......... ~0-~§3- 8944.70 ........ -61.50 2076.20 -4248.60 23.70 -35.30' 37.70 1989.00 -4290.10 5961262.00 649173.90 .io9i~)2'.40 ....... ~41i"7~ .... :~-~5~.':f9 .......... e~5~i§'b ........ ~'i.'9~o :~(~84.:~b :4~7§.7b :~.C~'0 ~:~8'i~6 2~21~-~)- ..... i-9-~'.~ ................................ ; 10938.50 73.22 277.24 8972.00 110.20 2090.70 -4306.60 25.10 -22.00 32.40 2002.40 -4348.40 '5~)6 i~27-5-1'5-0 ............ '84~9~'~'"~'5'.'60 ':['09'6~.401 ' ' 83.i~2 2-'~i:~- ........ 8~'~'~i~0': 134':30 ~'~ ' :4~3:~'~ ~'.'~ _6.-~ 3~.'~-~ .... ~0-~ ............................................................ '. I 11031.40~ 103.58 262.86 8972.70 193.90 2094.70 -4398.10 25.90, __ -28.60 38.30 2004.50 -4439.90 5961277.50 649024.10 .................................. [-.-~-~'~ ......... ~ ~ ~55.35 ...... ~:70' 229.90 2087.80 -4434.10 ........ ~.~-~ .... :~0-~ .......... ~-~ ..... ~.~ ..... :~.~-i ......... ~-~-~ .............. ~4~-~~ ....... ~ : ................. [ .................. ~ .................................................................. ..................... ? -'~-~:~0- .... 9~.~] ........ ~ ...... ~-~ ...... -2~ ........ )~ ..... ~;~ ..... ~ .... ;~;b~- ....... ~-~984.40 --7~'~ ............. .............. ~--~-~7'3~-b ..... ~{-~- ........ ~ .... ~945.~ ...... ~;~ .... ~b~6 .... :~52~.30 .......... ~---~ff~ ........ ~ ..... ~952.00/-'~5~7. 11268.40 99.~5 '~ ~-~':4~' .... ~'.-~0~ 4~'5'.20 i976.0~ -458-9~0[ ~ :29'.~-0 '2~.~0~ '18~'.~0'[ :~'~.6~[ 5~6~'~'55-.0'0: ' 6~-8'~5.'40 ' ' ~ '1129~b 95.~0 ~ ~05-.'2-~ .... ~-~4.'3~ 43~.50~ 1953.8~ :~60~ -15.50 -24.10~ 28~50 i85~.~0[ ~ 11356.20~ 89.20~ 204.02 8922.80~ 476.10~ i895.60'1 -4623.10', -3.10~ 26.10'~ 26.30~ 1800.80; -4660.80~ 5961073.50'. 648803.30 ~ 11388.20: 87.62 208.2~ 89~3:~0~ 499.~0~ 18~6.90[ -4~3~.10[ -5.00; 13.20; 14.10t 1771.80' -4674.30~ 596104~.50' 648789.~ .. 2 d-26aeow.xls D-26 A END OF WELL SURVEYS 7/3/97 12:51 PM ~COMMENTS MD Inc. Dir SS DEPTH VS TRUE TRUE Build Turn Dogleg GRID GRID ASP Y ASP X -~'-1'-;4,~73-6 .................. 8-8';~'~ ............ ~-~'~)-;-~J'~ .......... 8-~'~¢';~ ............ -514~';;46 ...... i'§'~-8-;1."6 ...... '1~688'.-2~ ................ ;~7§'0- ~3'~i'~0-' ............... ~-5'i-1"~) ....... ~"~'~-~7~ .... ~¢~-~ ~'~-C~,~,~ .................. 11475.80 90.17 227.05 8927.80 573.10 1796.70 -4688.50 11.00 23.80 26.20 1700.60 -4724.20 5960973.00 648739.80 11508.90 89.55 232.68 8927.90 604.40 1775.40 -4713.80 -1.90 17.00 17.10 1678.70 -4749.00 5980951.00 648714.90 11541.70 90.78 236.90 8927.80! 636.30 1756.40 -4740.60 3.80 12.80 13.40 1659.30 -4775.40 5960931.50 648688.60 11577.30 90.97 242.34 8927.20 671.40 1738.50 -4771.30 0.50 15.30 15.30 1640.70 -4805.80 5960913.00 648658.30 11615.30 93.33 247.44 8925.80 709.30 1722.40 -4805.60 6.20 13.40 14.80 1623.80 -4839.80 5960896.00 648624.20' 19~:5-7: i.'' ~i'~i!i' 8~i~'i~i~i' ~7-!i~ ~'~ ' I 11674.30 92.45 250.26 8922.00 768.20 1702.00 -4860.90 -6.80 -1.10 6.90~ 1602.40 -4894.60 5960874.50 648569.40 11700.80 90.68 253.24 8921.20 794.60 1693.70 -4886.00 -6.70 11.20 13.10 1593.60 -4919.60 5960865.50 648544.40 11761.00 89.12 256.94 8921.60 854.40 1679.00 -4944.40 -1.20 1.20 1.70 1577.70 -4977.60 5960849.50 648486.40 11790.50 88.07 258.52 8922.30 883.40 1672.70 -4973.20 -3.60 5.40 6.40 1570.80 -5006.30 5960842.50 648457.70 11819.60 87.97 256.76 8923.30 912.10 1666.50 -5001.60 -0.30 -6.00 6.10 1564.00 -5034.60 5960835.50 648429.40 i 11847.20 89.00 253.40 8924.00 939.50 1659.40 -5028.30 3.70 -12.20 12.70 1556.40 -5061.10 5960828.00 648402.90 'i'-1-~§~-.~'(])' .......... ~7';7--~ ......... ~-~.-~-4- 8925.00 ......... ~-~-........ i'~-9--]~-~ .... ~-~(~-~C~8'-~ ............ :'3-[9-6- ............. :~'18~' .................... ~¢~ ........ -~-~-6-~6~ ....... '~',~0-~-.~6 ....................... 5~0-~-~-~-1'5-~ ................... 11908.70 87.35 250.96 8926.20 1000.80 1640.80 -5086.80 -1.20 -5.60 5.70 1536.60 -5119.30 5960808.00 648344.80 i-i-~-,~-~0- ........... -8'~i~4-~ .......... ~ 4--¢. 4--~' 8~-¢.-~- .... '~5~-¢'; ~0' ...... i'8-~-1-7~,-~ ~'-"----5-1-i-~'-.'¢-0- .......... ~'~-6- ........ i"i"§'i'~ ........... -~"~7.~ ........ i-~-87~0- ..... :'~-~'-4'~ ................ '~5~'~'~'~-8-]-~-' - .................. -~ 1976.40 ........... 8-~'i-~'~ ............ ~;4~5--~ 8930.10 1068.50 1615.30 ~ -5149.50 -- 0.90 .......... --~. 1~ ~.-~6--- 15--6,~.8~ .... -5--~-~-;3-~ ................ ~-6-~-~'~6 ................... ~4-~-8-~-.-:~0 -1-~[:) 6--[-~)- .......... -8~'.~- ......... -~-4~'. 2-~ ...... -~'~b- ...... ~-8'; :~ ....... i-~-~-.-~ ....... : 5-i-~'~i ¢6 ............ --'~,~6 ............. :'1' :';2.0- ........... '4~-4-~- ........ i-4CJ ¢:-~ ...... : ~[D-~-~J .............. ~-98~¢8~ ................ -~ I 12036.10 84.48 242.02 8934.60 1127.80 1590.40 -5203.50 -3.70 -14.00 i 14.50 1483.80 -5234.90 5960755.00 648229.20 ....... i-~i 6~ :46 ...... 8~ ;47- ..... ~ 83 ...... ~'~8'~0 1'206.80 ' 1'~5'~i~,~ :~69".~) .... 7 6C~ 0 oo 7.60 1450.40! -5300.00 5960721.50 648164.10 , 12137.00 90.68 246.92 8938.70 1228.40 1547.00 -5294.40 4.40 8.30 9.40 1438.60 -5324.90 5960709.50 648139.20 ' 12201 70] 88 07 252 19 8939 001 1293 oot 1524 30 -5354 9oI -5 90 9.10 10.90 1414.601 -5384.90 5960685.50 648079.10 ! i2234160 ' 86.03 "255.18- -8~;7(~i' 1325'.'¢01 'i-5~0- ..... -:i~'38-~:~-i ......... L-6~' 9:'i(~ ..... i~(~ .... i-40~,i'80~ ..... :~7~1~-.~-0 ........ ~5-{)-8~8~ .......... ....................... i' 'i-~6-3;86- .... -~i~ ~:~ ..... ~'~-~:-~'i ..... l~-~:~b-~ 'i'~d~-~6-f-'-~4-1-4'.~_~ .......... 7E-4--0-1 .......... ~'~,-~'~. .......... ~7~6',, ..... ¥~¢.~7~¥4:4-4.~-5 ....... ~-~¢.-~-6 ............... ......... !' 'i 2~8.6~ ~ ' ~.~'. ..... ~-~-4-. '- -~'~,~'-:~6. ..... ~3~-9. ;I©, .... '~'~6~;'~-'1---"75-~87~. . [ ........... -~E-6~I. . ..... ¢.-0~- ......... ~-b~. ....... -1'~-~.-~1.: .... ..... :~4~8--~.~: ......... ~-~-6~--~-(J: ._ ........... 1 8-2,~--~-~-~--8b. .:. : 12323 60 82 431 261 15' 8949 40 1413 20 1495 70 -5472 90 -4 30 10 00 10 80 1383 70 -5502 20 5960654 50' 647961 80 : ' i " ~ .......... ' - I' ' ' ' I ' - ' - - '~ ...... ! & ................ ~ .............. ' .... }1 ....................... ! i2355.60; 8~.-9'-0~ 280:98' 89~0-' 1;444.10i '1490.-80-1 '-'15504:'20i ~i.~0! '-0.50t 1-:~7~''; -1~-¢8.~-~" L~5~3-:~-0-! .... 5~80-6-49~0~J~ ..... 6-4-7~'(~'.~0 ........................ ; ]-;238-51-(~'. ..... i'-~:6~7 .... i-~'~-~;~]---~'4_~0: ...... ~'~47~:¢-(~': 1'.~-81,~i~-~-'-~75;~_~-_0-.[ .... :'6-.~_b-_': "' :~'8--~0.'.;-_--I .... -~:i~-0-[-17'---~-3.~.2_:~01 -5562._1.0_.i ~~-.--~ ......... 12412.50; 77 52 259.57[ 8963.701 1499.10 1481.00i -5559.40: -9.30i 0.00~ 9.30i 1367.20' -5588.40~ 5960638.00! 647875.70 '12442.90' 78.301 257.99 '~ 8970.10; 1528.30' 1475.20 -5588.501 2.60' -5.20" 5.701 1360.80, -5617.401 5960631.50! 647846.60 '12461.00! 79.35i 257.641 8973.60', 1545.801 1471.50' -5605.80! 5.80" -1.90' 6.10~ 1356.70. -5634.70 5960627.50" 647829.40 3 d-26aeow.xls D-26 A END OF WELL SURVEYS 7/3/97 12:51 PM COMMENTS MDI Inc. Dir SS DEPTH VS TRUE TRUE Build Turn Dogleg GRID~ GRID ASP Y ASP X THESE SURVEYS ARE TRUE AND CORRECT TO THE BEST OF MY KNOWLEDGE. iDISlRICI M~NAGER - DRILEX SYSlEMS, lNG. State of Als ................ ? Alaska Oil & Gas Conservation Comm. Atten' Lori Taylor 3001 Porcupine Drive Anchorage, AK 99501 .. Transmittal of Final Prints. Please sign and return copy to: Western Altas Logging Services Pouch 340013 /o Prudhoe Bay, AK 99734-0013 27-Jun-97 Well Name D-26 A :)-26 A D-26 A IServices iInduction Electrolog/GR BHC Acoustilog/GR IComp. Neutron/GR Bluelines R/F Sepia Film Receive~by: ' Contact Rebecca Lange if you have a question concerning this transmittal at (907) 659-2816 or Fax (907) 659-2602. MEMORANDUM TO: State of Alaska Alaska Oil and Gas Conservation Commission DATE: May 29, 1997 THRU: Blair Wondzell, ~ FILE NO: P. I. Supervisor ahuke3ee. DOC FROM: Chuck Scheve, g- ~ SUBJECT: Petroleum Inspector BOPE Test Nordic 1 PBU D-26 A PTD 97-87 Thursday May 29~1997: I traveled to BPXs PBU D Pad to witness the initial BOPE Test on Well 26 A being drilled by the Dowell Schulumberger / Nordic coil tubing drilling unit. As the attached AOGCC Test Report shows the test lasted 3 hours and there were no failures. The testing went very well with good test procedures being employed by the Nordic crew. The Rig was clean and ali related equipment appeared to be in good condition. SUMMARY: I witnessed the initial BOPE test on Nordic Rig 1 drilling BPXs D-26 A Well. Nordic 1, 5129197, Test Time 3 hours, 0 Failures Attachments: ahuke3ee.xls X Unclassified ClasSified Unclassified with Document Removed STATE OF ALASKA OIL AND GAS CONSERVATION COMMISSION Coil Tubing Unit BOPE Test Report OPERATION: Drig: __.___ Drlg Contractor: Operator: Well Name: Casing Size: Test: Initial X Workover: DS / Nordic D-26 A 7" Set @ X Weekly DATE: 5/29/97 Rig No. I PTD # 97-87 Rig Ph.# 448-1345 BPX Rep.: Sevcik / Whitlow Rig Rep.: 11,088 Location: Sec. Other Shawn McKeirnan 23 T. 11N R. 13E Meridian UM BOP STACK: Coil Tubing Unit: Pipe/Slip Rams Pipe/Slip Rams Blind Rams Reel Isolation Valve Deployment: Annular Preventer Pipe Rams Lower Pipe Rams Blind Rams Choke Ln. Valves HCR Valves Kill Line Valves Test Quan. Pressure P/F 1 200/4000 1 200/4000 1 200/4000 200~4000 P 200/4000 P 20O/4OOO P 200/4000 P 200/4000 P Test CHOKE MANIFOLD: Quan. Pressure P/F Ne. Valves 15i 200/40001P No. Flanges 30 200/4000 . P Manual Chokes I Functioned P Hydraulic Chokes 1 Functioned P ACCUMULATOR SYSTEM: System Pressure Pressure After Closure 200 psi Attained After Closure System Pressure Attained Blind Switch Covers: Master: Nitgn. Bt's: 3~,2200 MUD SYSTEM: V'~ual Alarm MISC. INSPECTIONS: Tdp Tank OK OK Location Gen.: OK Pit Level Indicators OK OK Housekeeping: OK Meth Gas Detector OK OK Permit to ddll: Yes H2S Gas Detector OK OK Standing Order Posted Yes 3000 2200 minutes 33 minutes 12 OK Remote: Psig. sec. sec. OK Well Sign OK Dd. Rig OK Hazard Sec. Yes Number of Failures: 0 ,Test Time: 3.0 Hours. Number of valves tested 22 Repair or Replacement of Failed Equipment will be made within 0 days. Notify the Inspector and follow with Written or Faxed verification to the Commission Office at: 'Fax No. 276-7542 Inspector North Slope Pager No. 659-3607 If your call is not returned by the inspector with'in 12 hours please contact the P. I. Supervisor at 279-1433 REMARKS: Good Test Distribution: orig-Well File c- Oper./Rig c- Database c - Tdp Rpt File c -Inspector STATE WITNESS REQUIRED? YES X NO 24 HOUR NOTICE GIVEN YES X NO Waived By: VVitnessed By: Chuck Scheve Form Revised 2J20197 L.G. AHUKE3EE.XLS 5/30/97 TONY KNOWLE$, GOVERNOR ALASKA OIL AND GAS CONSERVATION COMMISSION 3001 PORCUPINE DRIVE ANCHORAGE, ALASKA 99501-3192 PHONE: (907) 279-1433 FAX: (907) 276-7542 May 16, 1997 Mr. Ted Stagg Coiled Tubing Drilling Engineer BP Exploration (Alaska), Inc. ?OBox196612 Anchorage, AK 99519-6612 Re: Prudhoe Bav Unit D-26A BP Exploration (Alaska) Inc. Permit No: 97-87 Sur. Loc. 1716'SNL. 1692'WEL, Sec. 23, TllN. R13E, UM Btmnhole Loc. 141'NSL, 1125'WEL, Sec. 15, T1 IN, R13E, UM Dear Mr. Stagg: Enclosed is the approved application for permit to redrill the above referenced ~vell. The permit to redrill does not exempt you from obtaining additional permits required by law from other governmental agencies, and does not authorize conducting drilling operations until all other required permitting determinations are made. Blowout prevention equipment (BOPE) must be tested in accordance with 20 AAC 25 035. Sufficient notice (approximately 24 hours) must be given to allow a representative of the Commission to witness a test of BOPE installed prior to drilling new hole. Notice may be given pector on the North Slope pager at 659-3607. Dav'~ W. Johnston ~ ~ Chairman ~'x...~) BY ORDER OF THE COMMISSION dlffEnclosures cc: Department of Fish & Game, Habitat Section w/o encl. Department of Environmental Conservation w/o encl. ALASKA STATE OF ALASKA AND GAS CONSERVATION C( VIISSION PERMIT TO DRILL .... 20 AAC 25.005 la. Type of work Drill Re-Entry [] Redrill ~J lb. Type of well. [] Deepen Service [] Exploratory [] StratigraphicTest [] Development Gas [] Single Zone [] Development Oil [] Multiple Zone [] 2. Name of Operator 5. Datum Elevation (DF or KB) KBE= 72.70 feet RP Exploration 6. Property Designation 028284 3. Address P ¢) Rn~ 1.ctRF~lP Annh~r~n~_ Al~.~k~ 9,qF¢lg-(:i61P 4'. Location of well it su rf'~c~ 1716'SNL, 1692' WEL, Sec.23, T11N, R13E At top of productive inte rval 120' NSL, 365'WEL, Sec. 15, T11N, R13E At total depth 141 NSL, 1125' WEL, Sec. 15, T11N, R13E 2. Distance to nearest 13. Distance to nearest w ell property line ADL 028285 @ 1125 feet no close approach feet 16. To be completed for d eviated wells Kickoff depth ~o,e~6 feet Maximum hole angle ~oo o 7. Unit or property Name Prudhoe Bay Unit 8. Well number D-26A 9. Approximate spud date 6/4/97 4. Number of acres in pr 2560 17. Anticipated pressure Maximum surface 3330 psig At total depth (TVD) 0. Field and Pool Prudhoe Bay Field/Prudhoe Bay Pool 11. Type Bond (see 20 AAC 25.025) Number 2S 100302630-277 Amount $200,000.00 operty 5. Proposed depth (MD and TVD) 12,435 MD, 8960 feet (see 20 AAC 25.035 (e)(2) ) RR¢)¢)' /.~,¢iR/l psig 18. Casing program size Hole 3 3/4 Casing Weight 2 7/8" 6.16# Specifications Grade Coupling L-801 ST-L Setting Depth Top Bottom Quantity of cement Length M D TVD M D TVD (include stage data) 2270' 10,165 8425 12,435 8860 195 c.£ 19. To be completed for R Present well condition su mmary Total depth: measured true vertical Effective depth: measured true vertical edrill, Re-entry, and Dee Casing Length Structural Conductor 110 Surface 2679 Intermediate 10106 Production 11070 feet BKB 9170 feet 11026 feet BKB 9137 feet Size 20x30 13 3/8 9 5/8 pen Operations. Plugs(measured) MAY 8 1997 Junk (measured) '~ ~jJ .-& Gas .C0rls, Cemented Measured depth True Vertical depth BKB 8 c.v. 140 140 3725 c.f. 2709' 2608' 2110 c.f. 10136 8477 Liner 1203 PeRoration depth' measured true vertical 7 435 c.~ 986~11070 8281-9170 20. Attachments Filing fee [] Property plat Drilling fluid program [] Time vs depth plot [] 21. I hereby ce.~.~~oing is true ansigned [] BOP Sketch [] Diverter Sketch [] Drilling program [] Refraction analysis [] Seabed report [] 20 AAC 25.050 requirement s[] d correct to the best of my knowledge Title Coiled Tubing Drilling Engineer Commission Use Only Date APl number jApproval date Permit Number Conditions of approval Sam I~.~.s required [] Yes ~ No Mud log required [] Yes ~]~ No Hydrogen sulfide measures ~ Yes [] No Directional survey requir ed ]~ Yes [] No Required working pressure for BOPE [] 2M; 1-13M;v, []5M' ~10M; E315M; Other: 0rlglnal 5~9~,.~,-. ~ ,~,¥/~ Approved by David W. Johnston Commissioner Form 10-401 Rev. 12-1-85 See cover letter for other requirements L by order of the commission Submit in triplicate BPX D-26A Sidetrack Summary of Operations: The well is being sidetracked to reduce GOR and improve PI. This sidetrack will be conducted in two phases. Phase 1: Prep for window: Planned for 5/20/97. - The existing lower Ivishak perforations will be abandoned with fiber cement. - Fiber cement will be pressure tested and tagged to confirm top. Phase 2: Drill Directional Hole: Planned for 6/4/97. - Directional drilling coil tubing equipment will be rigged up and utilized to mill the window and drill the directional hole per attached plan to a TD of 12,435' MD (8,960' -I-VDss). Mud Program: - Phase 1: Seawater - Phase 2: FIo-Pro (8.8 - 8.9 ppg) Casing Program: - 2 7/8", 6.16#, L-80, ST-L liner will be run from TD to approx. 10,165' MD and cemented with approx. 17 bbls. cement. The well will then be perforated with coil tubing conveyed guns. Well Control: - BOP diagram is attached. - Pipe rams, blind rams and the CT pack off will be pressure tested to 400 psi and to 4000 psi. - The annular preventer will be tested to 400 psi and 2000 psi. Directional - See attachments. - Kick Off: 10,816' MD (8910' TVD ss) - TD: 12,435' MD (8860' TVD ss) - Magnetic and inclination surveys will be taken every 30 ft. No gyro will be run. Logging - A Gamma Ray log will be run over all of the open hole section. /CNL/Densitylogs are tentatively scheduled. Open hole GR/Resistivity D-26 6OO Vertical Section Path Distance (Feet) 800 1,000 1,200 1,400 1,600 1,800 2,000 2,200 2,400 2,600 2,800 3,000 25N, 25P Tbg,Tail Angle @ k.O.= 42 deg MD:10816 DL 1= 35 deg/100 52 deg DL 3= 20 deg/100 ,8,915 .............. 100 deg 8,965 DL 2= 35 deg/100 12451 TD Tot Drld:1635 ft Marker Depths ~Orig Wellbore TbgI 8,8721ff TVD s,91sI 8,9~51~ TVD 25N I 8,8551ft -I-VD 25P ~ft TVD Kick Off 8,910 ft TVD 10,816 ft MD Deprtr ~KO 4,699 ft MD KO Pt 10,816I MD New Hole 1635I Total MD 12,4511 TVD TD 8,964] DLS deg/100 Curve 1 35 Curve 2 35 Curve 3 20 Curve 4 ~~ Curve 5 Curve 6 Curve 7 , Tool Face Length -45 40 -15 140 -95 400 90 120 100 160 100 575 90 200 1,635 Drawn: 5/1/97 10:20 Plan Name: Case 102 D-26 2,000 -6,500 -6,000 -5,500 -5,000 -4,500 -4,000 -3,500 X distance from Sfc Loc ................. D-26 I IWell Name CLOSURE Distance 5,069 ft I I Az 290 deg NEW HOLE E/W (X) NIS (Y) Kick Off -4,251 1,967 TD -4,753 1,763 State Plane 648,711 5,961,035 Sudace Loc 653,464 5,959,272 DLS deg/100 Tool Face Length Curve 1 35 -45 40 Curve 2 35 -15 140 Curve 3 20 -95 400 Curve 4 6 90 120 Curve 5 6 100 160 Curve 6 6 100 575 Curve 7 6 90 200 1,635 Drawn: 5/1/97 10:20 Plan Name: Case 102 LU 36" 22.5" 2 3/8" CT ~'-~0,000 ps~ Lubricator--~. ~ 7 1/16" Annular Blind/Shear 71/16" Pipe/Slip Slip ~1/16', Pipe 2 3/8" ~ 2 7/8" SWAB OR MASTER VALVE WELL PERMIT CHECKLISToo. . GEOL AREA vy rl~' wellbore segr] ann disp para reqO ~_~ PROGRAM: expo de red servO OX/OFF S.O ADMINISTRATION 1 2 3 4 5 6 7 8 9. 10. 11. 12. 13. Permit fee attached .................. ./ Y \ Lease number appropriate ............... Unique well name and number .............. Well located in a defined pool .............. Y Well located proper distance from drlg unit boundary. . .Y Well located proper distance from other wells ..... Y Sufficient acreage available in drilling unit ..... ~Y If deviated, is wellbore plat included ......... Operator only affected party .............. Operator has appropriate bond in force .......... Permit can be issued without conservation order ..... Permit can be issued without administrative approval. . Can permit be approved before 15-day wait ....... ENGINEERING 14. 15. 16. 17. 18. 19. 20. 21. 22. 23. 24. 25. 26. 27. 28. 29. Conductor string provided ................ Y N ~ Surface casing protects all known USDWs ......... Y N CMT vol adequate to circulate on conductor & surf csg. . Y N CMT vol adequate to tie-in long string to surf csg . . . Y N CMT will cover all known productive horizons ...... ~ N Casing designs adequate for C, T, B & permafrost .... ~ N Adequate tankage or reserve pit ............. ~ N If a re-drill, has a 10-403 for abndnmnt been approved. .Y N Adequate wellbore separation proposed .......... ~ N If diverter required, is it adequate ........... ~--~~ Drilling fluid program schematic & equip list adequate . Y~ N BOPEs adequate ..................... ~ N BOPE press rating adequate; test to ~--L~ psig.~ N Choke manifold complies w/API RP-53 [May 84) ...... Y~ N ~c'/' Work will occur without operation shutdown ....... ~ N Is presence of H2S gas probable ............ Y~ N GEOLOGY DATE /, 30. Permit can be issued w/o hydrogen sulfide measures .... Y ~/ 31. Data presented on potential overpressure zones ..... Y /N-- ~ / /.~ 32. Seismic analysis of shallow gas zones .......... y N ,/ [_~/[i1 33. Seabed condition survey (if off-shore) ......... / N ~ 34. Contact name/phone for weekly progress reports .... ~/ Y N [exploratory only] ~/ REMARKS GEOLOGY: ENGINEERING: COMMISSION: Comments/Instructions: HOWIdlf- A:\FORMS\cheklist rev 01/97 Well History File APPENDIX Information of detailed nature that is not particularly germane to the Well Permitting Process but is part of the history file. To improve the readability of the Well History file and to simplify finding information, information, of this nature is accumulated at the end of the file under APPENDIX. No special effort has been made to chronologically organize this category of information. D-26A PRUDHOE BAY 0CT ! G !997 · Alaska Oil ~ ""-,,' "' - - Run 1' 13 - June - 1997 ACICNIIEL/GR WESTERN ATLAS 10818' 12478' Logging Services Tape Subfile 2 is type: TAPE HEADER PRUDHOE BAY UNIT OPEN HOLE WIRELINE LOGS WELL NAME: API NUMBER: OPERATOR: LOGGING COMPANY: TAPE CREATION DATE: JOB DATA D-26A 500292153001 BP EXPLORATION (ALASKA) INC. WESTERN ATLAS LOGGING SERVICES 23-SEP-97 RUN 1 RUN 2 RUN 3 D. CAIN D. STEARNS JOB NUMBER: LOGGING ENGINEER: OPERATOR WITNESS: SURFACE LOCATION SECTION: TOWNSHIP: RANGE: FNL: FSL: FEL: FWL: ELEVATION(FT FROM MSL 0) KELLY BUSHING: DERRICK FLOOR: GROUND LEVEL: 23 liN 13E 1716 OPEN HOLE 1692 WELL CASING RECORD 1ST STRING 2ND STRING 3RD STRING PRODUCTION STRING REMARKS: 72.70 CASING DRILLERS BIT SIZE (IN) SIZE (IN) DEPTH (FT) 7.000 10816.0 3.750 12480.0 AC/CN/IEL/GR. LOG CORRELATED TO GEARHART BHC SONIC DATED 02-06-86. AC NOISE IS FROM HOLE CONDITIONS AND TOOL STRING BEING RUN FREE. DUE TO SMALL HOLE, TOOL STRING WAS NOT CENTRALIZED. IEL REPEAT PASS FROM DOWN LOG WAS NOT NORMALIZED. THE MAIN PASS GAMMA RAY FROM THIS LOG IS THE DEPTH REFERENCE FOR THIS WELL. FILE HEADER FILE NUMBER: 1 EDITED OPEN HOLE MAIN PASS Ail tool strings; hole data. DEPTH INCREMENT: FILE SUMMARY PBU TOOL CODE GR BCS SN 2418 $ BASELINE CURVE SHI depth shifted and clipped curves; .5000 START DEPTH STOP DEPTH 10818.0 12419.0 10818.0 12458.0 10818.0 12478.0 10818.0 12427.0 CURVE FOR SHIFTS: GR FT DATA (MEASURED DEPTH) BASELINE DEPTH DT 10827.5 10827.5 10840.0 10839.0 10840.5 10855.0 10855.0 10867.5 10867.0 10880.5 10891.5 10891.5 10910.0 10910.5 10917.5 10932.5 10932.5 10943.0 10988.0 11027.5 11030.0 11030.0 11039.5 11040.0 11040.5 11040.5 11043.0 11043.5 11050.5 11050.0 11082.5 11083.0 11096.5 11107.0 11115.5 11116.0 11122.0 11143.0 11143.0 11148.0 11185.5 11208.0 11208.0 11226.0 11226.0 11250.0 11250.0 11255.5 11255.5 11267.5 11268.0 11274.5 11286.5 11287.0 11294.5 11295.0 11346.5 11347.0 11347.0 11371.0 11374.0 11374.0 all runs merged; EQUIVALENT UNSHIFTED DEPTH RT NPHI 10827.5 10828.0 10839.5 10841.0 10880.5 10918.0 10988.0 11039.5 10892.0 10943.0 11028.0 11040.5 11148.5 11096.5 11107.5 11116.0 11121.5 11185.0 11227.0 11268.5 11269.0 11274.5 11286.5 11347.0 11371.5 no case 11378. 11398. 11406. 11435. 11466. 11486. 11535. 11539. 11548. 11550. 11567. 11588. 11591. 11615. 11621. 11624. 11635. 11638. 11641. 11656. 11690. 11701. 11718. 11720. 11722. 11725. 11741. 11745. 11747. 11747. 11754. 11761. 11806. 11816. 11849. 11861. 11911. 11915. 11933. 11946. 11966. 11997. 12000. 12034 . 12049. 12088. 12108. 12166. 12185. 12220. 12226. 12265. 12265. 12267. 12284. 12293. 12294. 12299. 12302. 12307. 11434.5 11466.5 11535.0 11539.5 11548.5 11567.0 11592.0 11616.0 11624.5 11638.5 11657.0 11701.0 11718.5 11720.5 11723.0 11726.0 11745.5 11806.0 11860.5 11915.0 11946.5 11997.0 12050.0 12089.0 12166.5 12265.5 12267.0 12284.0 12293.5 12299.0 11379.0 11550.5 11636.0 11742.0 11748.0 11754.0 11761.5 11816.0 11849.5 11911.5 11999.5 12033.0 12108.5 12220.0 12225.0 12265.0 12293.5 12299.0 11379.0 11398.5 11406.0 11486.5 11589.0 11621.5 11642.0 11690.0 11748.0 11762.0 11933.5 11966.5 11998.0 12034.0 12185.0 12226.0 12302.0 12307.5 12308.0 12308.5 12315.0 12337.5 12339.0 12345.0 12347.5 12349.5 12359.5 12382.0 12415.0 12420.0 12422.0 12455.5 $ MERGED DATA SOURCE PBU TOOL CODE GR BCS SN 2418 $ REMARKS: 123o~d.0 12345.5 12347.0 12350.0 12360.0 12415.5 12308.0 12339.0 12455.5 12315.0 12336.5 12345.0 12359.0 12382.0 12419.5 12421.0 RUN NO. PASS NO. 1 3 1 3 1 3 1 3 OPEN HOLE PORTION OF MAIN PASS. TEND & TENS WERE SHIFTED WITH DT. SN & SP WERE SHIFTED WITH RT. FUCT & NUCT WERE SHIFTED WITH NPHI. MERGE TOP MERGE BASE 10818.0 12419.0 10818.0 12458.0 10818.0 12478.0 10818.0 12427.0 / ? ?MATCH1. OUT / ? ?MATCH2. OUT / ? ?MATCH3. OUT $ CN : BP EXPLORATION WN : D-26A FN : PRUDHOE BAY COUN : NORTH SLOPE STAT : ALASKA * FORMAT RECORD (TYPE# 64) ONE DEPTH PER FRAME Tape depth ID: F 10 Curves: (ALASKA) Name Tool Code Samples Units 1 GR BCS 68 1 GAPI 2 DT BCS 68 1 US/F 3 TEND BCS 68 1 LB 4 TENS BCS 68 1 LB 5 RT SN 68 1 OHMM 6 SN SN 68 1 OHMM 7 SP SN 68 1 MV Size API API API API Log Crv Crv Length Typ Typ Cls Mod 4 57 310 01 1 4 57 530 16 1 4 57 995 99 1 4 57 995 99 1 4 23 995 99 1 4 23 995 99 1 4 23 995 99 8 NPHI 2418 68 ' ~ 1 PU-S 4 9 FUCT 2418 68 1 CPS 4 10 NUCT 2418 68 1 CPS 4 * DATA RECORD (TYPE# 0) 1018 BYTES * Total Data Records: 145 ~'~ 42 995 99 4 42 995 99 4 42 995 99 4O Tape File Start Depth = 12484.000000 Tape File End Depth = 10818.000000 Tape File Level Spacing = 0.500000 Tape File Depth Units = Feet **** FILE TRAILER **** LIS representation code decoding summary: Rep Code: 68 36664 datums Tape Subfile: 2 353 records... Minimum record length: 62 bytes Maximum record length: 1018 bytes Tape Subfile-3 is type: LIS FILE HEADER FILE NUMBER: 2 EDITED CASED HOLE MAIN PASS Depth shifted and clipped curves for open hole logs run into casing. PASS NUMBER: 3 DEPTH INCREMENT: .5000 FILE SUMMARY PBU TOOL CODE START DEPTH GRCH 10687.0 2418 10746.0 $ BASELINE CURVE FOR SHIFTS: GRCH CURVE SHIFT DATA (MEASURED DEPTH) BASELINE DEPTH NPHI 10752.5 10752.0 10755.0 10754.5 10771.0 10771.0 10775.0 10775.0 10782.0 10782.0 10784.0 10784.0 10799.0 10799.5 10812.0 10811.5 $ REMARKS: STOP DEPTH 10818.0 10818.0 EQUIVALENT UNSHIFTED DEPTH CASED HOLE PORTION OF MAIN PASS. FUCT, NUCT, TEND, & TENS WERE SHIFTED WITH NPHI. CN WN FN COUN STAT / ? ?MATCH4. OUT $ : BP EXPLORATION (ALASKA) : D-26A : PRUDHOE BAY : NORTH SLOPE : ALASKA * FORMAT RECORD (TYPE# 64) ONE DEPTH PER FRAME Tape depth ID: F 6 Curves: Name Tool Code Samples Units API API API API Log Crv Crv Size Length Typ Typ Cls Mod GRCH 2418 68 1 GAPI 4 NPHI 2418 68 1 PU-S 4 FUCT 2418 68 1 CPS 4 NUCT 2418 68 1 CPS 4 TEND 2418 68 1 LB 4 4 42 995 99 1 4 42 995 99 1 4 42 995 99 1 4 42 995 99 1 4 42 995 99 1 6 TENS 2418 68 1 LB 4 ~-'~ 42 995 99 1 * DATA RECORD (TYPE# 0) 1014 BYTES * Total Data Records: 8 24 Tape File Start Depth = 10818.000000 Tape File End Depth = 10684.000000 Tape File Level Spacing = 0.500000 Tape File Depth Units = Feet **** FILE TRAILER **** LIS representation code decoding summary: Rep Code: 68 1884 datums Tape Subfile: 3 46 records... Minimum record length: Maximum record length: 62 bytes 1014 bytes Tape Subfile.4 is type: LIS FILE HEADER FILE NUMBER: 3 RAW OPEN HOLE MAIN PASS Curves and log header data for each run and tool string in separate files; Tool String #1 for Sadlerochit run presented first (primary depth control string used to depth shift the Sadlerochit interval) followed by files for other main pass tool strings per run. RUN NUMBER: 1 TOOL STRING NUMBER: 1 PASS NUMBER: DEPTH INCREMENT: FILE SUMMARY 3 .2500 VENDOR TOOL CODE START DEPTH GR 10684.0 AC 10726.0 IEL 2418 $ LOG HEADER DATA DATE LOGGED: SOFTWARE VERSION: TIME CIRCULATION ENDED: TIME LOGGER ON BOTTOM: TD DRILLER (FT) : TD LOGGER (FT) : TOP LOG INTERVAL (FT) : BOTTOM LOG INTERVAL (FT) : LOGGING SPEED (FPHR) : 10746.0 10695.0 STOP DEPTH 12421.5 12460.5 12481.0 12430.0 TOOL STRING (TOP TO BOTTOM) VENDOR TOOL CODE TOOL TYPE CHT CORR GR CN PCM KNJT AC KNJT IEL $ CABLEHEAD TENSION CORRELATION SUB GAMMA RAY COMPENSATED NEUTRON PULSE CODE MODULATOR DOUBLE KNUCKLE JOINT BHC ACOUSTILOG DOUBLE KNUCKLE JOINT INDUCTION ELECTROLOG BOREHOLE AND CASING DATA OPEN HOLE BIT SIZE(IN): DRILLER'S CASING DEPTH (FT) : LOGGER'S CASING DEPTH (FT) : BOREHOLE CONDITIONS MUD TYPE: MUD DENSITY (LB/G): MUD VISCOSITY (S) : MUD PH: FLUID LOSS (C3) : MAXIMUM RECORDED TEMPERATURE (DEGF): RESISTIVITY (OHMM) AT TEMPERATURE (DEGF) 13-JUN-97 FSYS REV. J001 VER. 1.1 0 2326 12-JUN-97 12480.0 12483.0 10700.0 12478.0 900.0 TOOL NUMBER 3977XB 3965XA 1310XA 2418XA 3506XA 1605XA 0811XA 3.750 10816.0 10818.0 FLO-PRO .00 .0 .0 .0 .0 MUD AT MEASURED'-fEMPERATURE (MT): MUD-AT BOTTOM HOLE TEMPERATURE (BHT) : MUD FILTRATE AT MT: MUD FILTRATE AT BHT: MUD CAKE AT MT: MUD CAKE AT BHT: NEUTRON TOOL TOOL TYPE (EPITHERMAL OR THERMAL) : MATRIX: MATRIX DENSITY: HOLE CORRECTION (IN): TOOL STANDOFF (IN): REMARKS: MAIN PASS. $ CN WN FN COUN STAT : BP EXPLORATION (ALASKA) : D-26A : PRUDHOE BAY : NORTH SLOPE : ALASKA .000 .000 .000 .000 .000 THERMAL SANDSTONE .00 3.750 .0 .0 .0 .0 .0 .0 .0 * FORMAT RECORD (TYPE# 64) ONE DEPTH PER FRAME Tape depth ID: F 13 Curves: Name Tool Code Samples Units API API API API Log Crv Crv Size Length Typ Typ Cls Mod 1 GR AC 68 1 GAPI 4 2 AC AC 68 1 US/F 4 3 CHT AC 68 1 LB 4 4 TTEN AC 68 1 LB 4 5 SPD AC 68 1 F/MN 4 6 RT IEL 68 1 OHMM 4 7 SN IEL 68 1 OHMM 4 8 SP IEL 68 1 MV 4 9 COND IEL 68 1 MMHO 4 10 CNC 2418 68 1 PU-S 4 11 CN 2418 68 1 PU-L 4 12 LSN 2418 68 1 CPS 4 13 SSN 2418 68 1 CPS 4 4 60 310 01 1 4 60 520 99 1 4 60 635 99 1 4 60 635 99 1 4 60 636 99 1 4 05 120 46 1 4 05 040 16 1 4 05 010 01 1 4 05 110 46 1 4 42 995 99 1 4 42 890 01 1 4 42 334 31 1 4 42 334 30 1 52 * DATA RECORD (TYPE# 0) 1014 BYTES * Total Data Records: 401 Tape File Start Depth = 12484.000000 Tape File End Depth = 10684.000000 Tape File Level Spacing = 0.250000 Tape File Depth Unias = Feet **** FILE TRAILER **** LIS representation code decoding summary: Rep Code: 68 137479 datums Tape Subfile: 4 480 records... Minimum record length: 62 bytes Maximum record length: 1014 bytes Tape Subfile.5 is type: LIS FILE HEADER FILE NUMBER: 4 RAW OPEN HOLE REPEAT PASSES Curves and log header data for each pass, tool string, and run in separate files. RUN NUMBER: 1 TOOL STRING NUMBER: 1 PASS NUMBER: 2 DEPTH INCREMENT: .2500 FILE SUMMARY VENDOR TOOL CODE START DEPTH GR 10684.0 AC 10723.0 IEL 10742.5 2418 10692.0 $ LOG HEADER DATA DATE LOGGED: SOFTWARE VERSION: TIME CIRCULATION ENDED: TIME LOGGER ON BOTTOM: TD DRILLER (FT) : TD LOGGER (FT) : TOP LOG INTERVAL (FT) : BOTTOM LOG INTERVAL (FT) : LOGGING SPEED (FPHR) : TOOL STRING (TOP TO BOTTOM) VENDOR TOOL CODE TOOL TYPE CHT CABLEHEAD TENSION CORR CORRELATION SUB GR GAMMA RAY CN COMPENSATED NEUTRON PCM PULSE CODE MODULATOR KNJT DOUBLE KNUCKLE JOINT AC BHC ACOUSTILOG KNJT DOUBLE KNUCKLE JOINT IEL INDUCTION ELECTROLOG $ BOREHOLE AND CASING DATA OPEN HOLE BIT SIZE(IN): DRILLER' S CASING DEPTH (FT) : LOGGER'S CASING DEPTH (FT) : BOREHOLE CONDITIONS MUD TYPE: MUD DENSITY (LB/G): MUD VISCOSITY (S) : MUD PH: FLUID LOSS (C3) : MAXIMUM RECORDED TEMPERATURE (DEGF): RESISTIVITY (OHMM) AT TEMPERATURE (DEGF) MUD AT MEASURED TEMPERATURE (MT): MUD AT BOTTOM HOLE TEMPERATURE (BHT) : STOP DEPTH 12420.0 12459.0 12480.0 12420.0 13-JUN-97 FSYS REV. J001 VER. 1.1 0 2238 12-JI/N-97 12480.0 12483.0 10700.0 12478.0 900.0 TOOL NUMBER 3977XB 3965XA 1310XA 2418XA 3506XA 1605XA 0811XA 3.750 10816.0 10818.0 FLO-PRO .00 .0 .0 .0 .0 .000 .000 .0 .0 MUD FILTRATE AT--~4T: MUD .FILTRATE AT BHT: MUD CAKE AT MT: MUD CAKE AT BHT: NEUTRON TOOL TOOL TYPE (EPITHERMAL OR THERMAL) : MATRIX: MATRIX DENSITY: HOLE CORRECTION (IN): TOOL STANDOFF (IN): REMARKS: REPEAT PASS - DOWN LOG. CN WN FN COUN STAT : BP EXPLORATION (ALASKA) : D-26A : PRUDHOE BAY : NORTH SLOPE : ALASKA .000 .000 .000 THERMAL SANDSTONE .00 3.750 .0 .0 .0 .0 .0 * FORMAT RECORD (TYPE# 64) ONE DEPTH PER FRAME Tape depth ID: F 13 Curves: Name Tool Code Samples Units API API API API Log Crv Crv Size Length Typ Typ Cls Mod 1 GR AC 68 1 GAPI 2 AC AC 68 1 US/F 3 CHT AC 68 1 LB 4 TTEN AC 68 1 LB 5 SPD AC 68 1 F/MN 6 RT IEL 68 1 OHMM 7 SN IEL 68 1 OHMM 8 SP IEL 68 1 MV 9 COND IEL 68 1 MMHO 10 CNC 2418 68 1 PU-S 11 CN 2418 68 1 PU-L 12 LSN 2418 68 1 CPS 13 SSN 2418 68 1 CPS 4 60 310 01 1 4 60 520 99 1 4 60 635 99 1 4 60 635 99 1 4 60 636 99 1 4 05 120 46 1 4 05 040 16 1 4 05 010 01 1 4 05 110 46 1 4 42 995 99 1 4 42 890 01 1 4 42 334 31 1 4 42 334 30 1 52 * DATA RECORD (TYPE# 0) 1014 BYTES * Total Data Records: 401 Tape File Start Depth = 12481.000000 Tape File End Depth = 10680.000000 Tape File Level Spacing = 0.250000 Tape File Depth Units = Feet **** FILE TRAILER ****"~' LIS representation code decoding summary: Rep Code: 68 102755 datums Tape Subfile: 5 478 records... Minimum record length: 62 bytes Maximum record length: 1014 bytes Tape Subfile ,,6 is type: LIS 97/ 9/23 01 **** REEL TRAILER **** 97/ 9/24 O1 Tape Subfile: 6 2 records... Minimum record length: 132 bytes Maximum record length: 132 bytes End of execution: Wed 24 SEP 97 9:53a Elapsed execution time = 4.72 seconds. SYSTEM RETURN CODE = 0 Sperry-Sun Drilling Services LIS Scan Utility Fri Sep 05 11:15:36 1997 Reel Header Service name ............. LISTPE Date ..................... 97/09/05 Origin ................... STS Reel Name ................ UNKNOWN Continuation Number ...... 01 Previous Reel Name ....... UNKNOWN Comments ................. STS LIS Writing Library. Scientific Technical Services Tape Header Service name ............. LISTPE Date ..................... 97/09/05 Origin ................... STS Tape Name ................ UNKNOWN Continuation Number ...... 01 Previous Tape Name ....... UNKNOWN Comments ................. STS LIS Writing Library. Scientific Technical Services Physical EOF Comment Record TAPE HEADER PRUDHOE BAY UNIT MWD/MAD LOGS WELL NAME: API NUMBER: OPERATOR: LOGGING COMPANY: TAPE CREATION DATE: JOB DATA JOB NUMBER: LOGGING ENGINEER: OPERATOR WITNESS: RECEIVED SEP 10 1997 .Alaska Oil & Gas C~ns, Com~.ica~ D- 26A ~ i~l!0l!¢,~ 500292153001 BP EXPLO~TION (~S~) , INC. SPERRY'SUN DRILLING SERVICES 05-SEP-97 MWD RUN 6 MWD RUN 7 MWD RUN 8 AK-MW-70158 AK-MW-70158 AK-MW-70158 STEVE LATZ BUD JAHN BUD JAHN WHITLOW/SEVC WHITLOW/PARK WHITLOW/PARK JOB NUMBER: LOGGING ENGINEER: OPERATOR WITNESS: MWD RUN 9 AK-MW-70158 BUD JAHN WHITLOW/PARK MWD RUN 10 AK-MW-70158 BUD JAHN WHITLOW/PARK MWD RUN 12 AK-MW-70158 BUD JAHN WHITLOW/PARK JOB NUMBER: LOGGING ENGINEER: OPERATOR WITNESS: MWD RUN 13 AK-MW-70158 BUD JAHN WHITLOW/PARK MWD RUN 14 AK-MW-70158 BUD JARN WHITLOW/PARK MWD RUN 15 AK-MW-70158 BUD JANN WHITLOW/PARK JOB NUMBER: LOGGING ENGINEER: OPERATOR WITNESS: SURFACE LOCATION SECTION: TOWNSHIP: RANGE: FNL: FSL: FEL: FWL: ELEVATION (FT FROM MSL 0) KELLY BUSHING: DERRICK FLOOR: GROUND LEVEL: WELL CASING RECORD MWD RUN 16 AK-MW-70158 BUD JAHN WHITLOW/PAHRK 23 liN 13E 1716 1692 72.70 .00 .00 OPEN HOLE CASING DRILLERS BIT SIZE (IN) SIZE (IN) DEPTH (FT) 1ST STRING 13.375 2707.0 2ND STRING 9.625 10136.0 3RD STRING 7.000 10814.0 PRODUCTION STRING 3.750 12490.0 REMARKS: 1. ALL DEPTHS ARE MEASURED DEPTHS (MD) UNLESS OTHERWISE NOTED. 2. ALL TRUE VERTICAL DEPTHS (TVD) ARE SUB SEA TRUE VERTICAL DEPTHS (SSTVD). 3. GAMMA RAY DATA FROM l1034'MD, 8972'SSTVD TO ll080'MD, 8963'SSTVD IS MEASURED AFTER DRILLING (MAD). 4. MWD RUNS 1 THROUGH 5 WERE LOGGED IN THE ORIGINAL BOREHOLE AND THEY ARE NOT PRESENTED. 5. THIS WELL IS REPRESENTED BY MWD RUNS 5 THROUGH 10 AND 12 THROUGH 16. THE TOTAL DEPTH (TD) IS 12490'MD, 8978'SSTVD. SROP = SMOOTHED RATE OF PENETRATION WHILE DRILLING. SGRD = SMOOTHED GAMMA RAY. - SSTVD = SUB SEA TRUE VERTICAL DEPTH (=TVD-KB). $ File Header Service name ............. STSLIB.001 Service Sub Level Name... Version Number ........... 1.0.0 Date of Generation ....... 97/09/05 Maximum Physical Record..65535 File Type ................ LO Previous File Name ....... STSLIB.000 Comment Record FILE HEADER FILE NUMBER: 1 EDITED MERGED MWD Depth shifted and clipped curves; all bit runs merged. DEPTH INCREMENT: .5000 FILE SUMMARY PBU TOOL CODE START DEPTH GR 10806.0 ROP 10835.0 $ BASELINE CURVE FOR SHIFTS: CURVE SHIFT DATA (MEASURED DEPTH) BASELINE DEPTH 10806 0 10827 10833 10840 10842 10845 10855 10888 10891 10898 10905 10919 10922 10932 11040 11063 11086 11107 11113 11115 11118 11226 11246 11249 11252 11284 11286 11293 11294 11302 11353 11425 11435 11465 11486 11534 11548 11566 11592 11615 11623 11636 11638 11642 11719 11722 11733 11783 11863 11868 5 0 0 0 0 0 0 5 0 0 5 .0 5 0 5 0 0 0 5 0 5 5 5 5 0 0 5 5 0 0 .5 0 5 5 5 0 0 0 5 5 0 5 5 5 5 5 0 0 0 GR 10806.0 10827.5 10833.0 10840.0 10841.5 10844.5 10857.5 10890.0 10894.0 10901.0 10906.5 10922 0 10924 0 10935 0 11043 5 11064 5 11083 5 11103.5 11107.0 11110.0 11114.0 11220.5 11241.5 11245 0 11248 0 11278 0 11279 5 11286 0 11287 0 11295 5 11352.0 11427.0 11437.0 11464 0 11486 0 11529 5 11544 5 11563 5 11590 0 11614 5 11623.0 11635.5 11638 5 11642 5 11727 0 11729 5 11741 5 11787 5 11869 5 11874 0 STOP DEPTH 12457.5 12484.0 EQUIVALENT UNSHIFTED DEPTH FILE SUMMARY PBU TOOL CODE GR ROP $ BASELINE CURVE SHI START DEPTH 10806.O 10835.0 CURVE FOR SHIFTS: FT DATA (MEASURED DEPTH) BASELI 10806. 10827. 10833. 10840. 10842. 10845. 10855. 10888. 10891 10898 10905 10919 10922 10932 11040 0 11063 5 11086 0 11107 0 11113 0 11115 5 11118 0 11226.5 11246 5 11249 5 11252 5 11284 0 11286 0 11293 5 11294 5 11302 0 11353 0 11425.5 11435 0 11465 5 11486 5 11534 5 11548 0 11566 0 11592 0 11615 5 11623 5 11636 0 11638 5 11642 5 11719 5 11722 5 11733 5 11783 0 11863 0 11868 0 NE DEPTH 0 5 0 0 0 0 0 0 5 0 0 5 0 5 GR 10806 10827 10833 10840 10841 10844 10857 10890 10894 10901 10906 10922 10924 10935 11043 11064 11083 11103 11107 11110 11114 11220. 11241 11245 11248 11278 11279 11286 11287 11295 11352 11427 11437 11464 11486 11529 11544 11563 11590 11614 11623 11635 11638 11642 11727 11729 11741 11787 11869 11874 STOP DEPTH 12457.5 12484.0 EQUIVALENT UNSHIFTED DEPTH 11873. 11878. 11881. 11912 11924 11949 11956 12015 12088 12095 12264 12268 12299 12308 12314 12318 12335 12344. 12484. $ MERGED PBU MWD MWD MWD MWD MWD MWD MWD MWD MWD MWD $ REMARKS: 11878.5 11883.0 11885.0 11919.0 11930.0 11956.0 11963.5 12021.5 12096.0 12102.5 12270.0 12273.5 12307.5 12315.5 12323.0 12325.5 12341.5 12349.5 12489.5 DATA SOURCE TOOL CODE BIT RUN NO MERGE TOP MERGE BASE 6 10835.0 10880.0 7 10880.0 11043.0 8 11043.0 11092.0 9 11092.0 11310.0 10 11310.0 11552.0 12 11552.0 11736.0 13 11736.0 12032.0 14 12032.0 12253.0 15 12253.0 12385.0 16 12385.0 12490.0 MERGED MAIN PASS. $ Data Format Specification Record Data Reco~d Type .................. 0 Data Specification Block Type ..... 0 Logging Direction ................. Down Optical log depth units ........... Feet Data Reference Point .............. Undefined Frame Spacing ..................... 60 .liN Max frames per record ............. Undefined Absent value ...................... -999.25 Depth Units ....................... Datum Specification Block sub-type...0 Name Service Order Units Size Nsam Rep Code Offset Channel DEPT FT 4 1 68 0 1 ROP MWD FT/H 4 1 68 4 2 GR MWD AAPI 4 1 68 8 3 First Name Min Max Mean Nsam Reading DEPT 10806 12484 11645 3357 10806 Last Reading 12484 ROP 6.76 1312.11 61.4665 3299 GR 17.55 166.24 35.3019 3304 10835 12484 10806 12457.5 First Reading For Entire File .......... 10806 Last Reading For Entire File ........... 12484 File Trailer Service name ............. STSLIB.001 Service Sub Level Name... Version Number ........... 1.0.0 Date of Generation ....... 97/09/05 Maximum Physical Record..65535 File Type ................ LO Next File Name ........... STSLIB.002 Physical EOF File Header Service name ............. STSLIB.002 Service Sub Level Name... Version Number ........... 1.0.0 Date of Generation ....... 97/09/05 Maximum Physical Record..65535 File Type ................ LO Previous File Name ....... STSLIB.001 Comment Record FILE HEADER FILE NUMBER: 2 RAW MWD Curves and log header data for each bit run in separate files. BIT RUN NUMBER: 6 DEPTH INCREMENT: .5000 FILE SUMMARY VENDOR TOOL CODE START DEPTH STOP DEPTH GR 10806.0 10852.0 ROP 10835.0 10880.5 $ LOG HEADER DATA DATE LOGGED: 03-JUN-97 SOFTWARE SURFACE SOFTWARE VERSION: DOWNHOLE SOFTWARE VERSION: DATA TYPE (MEMORY OR REAL-TIME): TD DRILLER (FT) : TOP LOG INTERVAL (FT): BOTTOM LOG INTERVAL (FT): BIT ROTATING SPEED (RPM): HOLE INCLINATION (DEG MINIMUM ANGLE: 49.2 I~J~XIMUM ANGLE: 60.8 TOOL STRING (TOP TO BOTTOM) VENDOR TOOL CODE TOOL TYPE TOOL NUMBER MSC 1.32 NGP 5.74, DEP 2.041, S2 MEMORY 10880.0 10835.0 10880.0 NGP NATURAL GAMMA PROBE BOREHOLE AND CASING DATA OPEN HOLE BIT SIZE (IN): DRILLER'S CASING DEPTH (FT): BOREHOLE CONDITIONS MUD TYPE: MUD DENSITY (LB/G): MUD VISCOSITY (S) : MUD PH: MUD CHLORIDES (PPM) : FLUID LOSS (C3): RESISTIVITY (OHM>4) AT TEMPERATURE (DEGF) MUD AT MEASURED TEMPERATURE (MT): MUD AT MAX CIRCULATING TERMPERATURE: MUD FILTRATE AT MT: MUD CAKE AT MT: NEUTRON TOOL MATRIX: MATRIX DENSITY: HOLE CORRECTION (IN): TOOL STANDOFF (IN) : EWR FREQUENCY (HZ): REMARKS: $ Data Format Specification Record Data Record Type .................. 0 Data Specification Block Type ..... 0 Logging Direction ................. Down Optical log depth units ........... Feet Data Reference Point .............. Undefined Frame Spacing ..................... 60 .liN Max frames per record ............. Undefined Absent value ...................... -999.25 Depth Units ....................... Datum Specification Block sub-type...0 NGP 15 3.750 3.8 Flo Pro 8.90 65.0 10.0 5.6 .000 .000 .000 .000 .3 Name Service Order Units Size Nsam Rep Code Offset Channel DEPT FT 4 1 68 0 1 GR MWD 6 AAPI 4 1 68 4 2 ROP MWD 6 FT/H 4 1 68 8 3 77.3 First Name Min Max Mean Nsam Reading DEPT 10806 10880.5 10843.2 150 10806 GR 20 114.15 35.4762 93 10806 ROP 19.44 87.27 47.2353 92 10835 Last Reading 10880.5 10852 10880.5 First Reading For Entire File .......... 10806 Last Reading For Entire File ........... 10880.5 File Trailer Service name ............. STSLIB.002 Service Sub Level Name... Version Number ........... 1.0.0 Date of Generation ....... 97/09/05 Maximum Physical Record..65535 File Type ................ LO Next File Name ........... STSLIB.003 Physical EOF File Header Service name ............. STSLIB.003 Service Sub Level Name... Version Number ........... 1.0.0 Date of Generation ....... 97/09/05 Maximum Physical Record..65535 File Type ................ LO Previous File Name ....... STSLIB.002 Comment Record FILE HEADER FILE NUMBER: 3 RAW MWD Curves and log header data for each bit run in separate files. BIT RUN NUMBER: 7 DEPTH INCREMENT: .5000 FILE SUMMARY VENDOR TOOL CODE START DEPTH STOP DEPTH GR 10855.0 11014.0 ROP 10884.0 11041.0 $ LOG HEADER DATA DATE LOGGED: 05-JUN-97 SOFTWARE SURFACE SOFTWARE VERSION: DOWNHOLE SOFTWARE VERSION: DATA TYPE (MEMORY OR REAL-TIME): TD DRILLER (FT) : TOP LOG INTERVAL (FT) : BOTTOM LOG INTERVAL (FT) : BIT ROTATING SPEED (RPM) : HOLE INCLINATION (DEG MINIMUM ANGLE: 60.7 MAXIMUM ANGLE: 102.8 TOOL STRING (TOP TO BOTTOM) VENDOR TOOL CODE TOOL TYPE NGP NATURAL GAMMA PROBE $ BOREHOLE ~D CASING DATA OPEN HOLE BIT SIZE (IN): DRILLER'S CASING DEPTH (FT) : MSC 1._32 NGP 5.74, DEP 2.041, S2 MEMORY 11043.0 10880.0 11043.0 TOOL NUMBER NGP 15 3.750 3.8 BOREHOLE CONDITIONS MUD TYPE: MUD DENSITY (LB/G) : MUD VISCOSITY (S) : MUD PH: MUD CHLORIDES (PPM): FLUID LOSS (C3) : Flo Pro 8.90 65.0 10.0 5.6 RESISTIVITY (OHMS) AT TEMPERATURE (DEGF) MUD AT MEASURED TEMPERATURE (MT): MUD AT MAX CIRCULATING TERMPERATURE: MUD FILTRATE AT MT: MUD CAKE AT MT: NEUTRON TOOL MATRIX: MATRIX DENSITY: HOLE CORRECTION (IN): TOOL STANDOFF (IN): EWR FREQUENCY (HZ): REMARKS: $ Data Format Specification Record Data Record Type .................. 0 Data Specification Block Type ..... 0 Logging Direction ................. Down Optical log depth units ........... Feet Data Reference Point .............. Undefined Frame Spacing ..................... 60 .liN Max frames per record ............. Undefined Absent value ...................... -999.25 Depth Units ....................... Datum Specification Block sub-type...0 .000 .000 .000 · 000 .3 Name Service Order Units Size Nsam Rep Code Offset Channel DEPT FT 4 1 68 0 1 GR MWD 7 AAPI 4 1 68 4 2 ROP MWD 7 FT/H 4 1 68 8 3 First Name Min Max Mean Nsam Reading DEPT 10855 11041 10948 373 10855 GR 18.08 110.99 31.3524 319 10855 ROP 15.56 221.58 42.9107 315 10884 77.3 Last Reading 11041 11014 11041 First Reading For Entire File .......... 10855 Last Reading For Entire File ........... 11041 File Trailer Service name ............. STSLIB.003 Service Sub Level Name... Version Number ........... 1.0.0 Date o~ Generation ....... 97/09/05 Maximum Physical Record..65535 File Type ................ LO Next File Name ........... STSLIB.004 Physical EOF File Header Service name ............. STSLIB.004 Service Sub Level Name... Version Number ........... 1.0.0 Date of Generation ....... 97/09/05 Maximum Physical Record..65535 File Type ................ LO Previous File Name ....... STSLIB.003 Comment Record FILE HEADER FILE NUMBER: 4 RAW MWD Curves and log header data for each bit run in separate files. BIT RUN NUMBER: 8 DEPTH INCREMENT: .5000 FILE SUMMARY VENDOR TOOL CODE START DEPTH STOP DEPTH GR 11000.0 11064.0 ROP 11000.0 11092.5 $ LOG HEADER DATA DATE LOGGED: 06-JUN-97 SOFTWARE SURFACE SOFTWARE VERSION: DOWNHOLE SOFTWARE VERSION: DATA TYPE (MEMORY OR REAL-TIME): TD DRILLER (FT): TOP LOG INTERVAL (FT): BOTTOM LOG INTERVAL (FT): · BIT ROTATING SPEED (RPM): HOLE INCLINATION (DEG - MINIMUM ANGLE: 99.6 - MAXIMUM ANGLE: 102.8 TOOL STRING (TOP TO BOTTOM) VENDOR TOOL CODE TOOL TYPE NGP NATURAL GAMMA PROBE $ BOREHOLE AND CASING DATA OPEN HOLE BIT SIZE (IN): DRILLER'S CASING DEPTH (FT): BOREHOLE CONDITIONS MUD TYPE: I~UJD DENSITY (LB/G): MUD VISCOSITY (S): MUD PH: MUD CHLORIDES (PPM) : FLUID LOSS (C3) : MSC 1.32 NGP 5.74, DEP 2.041, S2 MEMORY 11092.0 11043.0 11092.0 TOOL NUMBER NGP 9 3.750 3.8 Flo Pro 8.90 65.0 10.0 5.6 RESISTIVITY (OHMM) AT TEMPERATURE (DEGF) MUD AT MEASURED TEMPERATURE (MT): MUD AT MAX CIRCULATING TERMPERATURE: MUD FILTRATE AT MT: MUD CAKE AT MT: NEUTRON TOOL MATRIX: MATRIX DENSITY: HOLE CORRECTION (IN): TOOL STANDOFF (IN): EWR FREQUENCY (HZ) : REMARKS: $ Data Format Specification Record Data Record Type .................. 0 Data Specification Block Type ..... 0 Logging Direction ................. Down Optical log depth units ........... Feet Data Reference Point .............. Undefined Frame Spacing ..................... 60 .liN Max frames per record ............. Undefined Absent value ...................... -999.25 Depth Units ....................... Datum Specification Block sub-type...0 .3 .000 .000 .000 .000 Name Service Order Units Size Nsam Rep Code Offset Channel DEPT FT 4 1 68 0 1 GR MWD 8 AAPI 4 1 68 4 2 ROP MWD 8 FT/H 4 1 68 8 3 72.6 First Name Min Max Mean Nsam Reading DEPT 11000 11092.5 11046.2 186 11000 GR 25.88 93.5 42.0485 129 11000 ROP 24.66 1312.11 154.821 186 11000 First Reading For Entire File .......... 11000 Last Reading For Entire File ........... 11092.5 Last Reading 11092.5 11064 11092.5 File Trailer Service name ............. STSLIB.004 Service Sub Level Name... Version Number ........... 1.0.0 Date of Generation ....... 97/09/05 Maximum Physical Record..65535 File Type ................ LO Next File Name ........... STSLIB.005 Physical EOF File Header Service name ............. STSLIB.005 Service Sub Level Name... Version Number ........... 1.0.0 Date of Generation ....... 97/09/05 Maximum Physical Record..65535 File Type ................ LO Previous File Name ....... STSLIB.004 Comment Record FILE HEADER FILE NUMBER: 5 RAW MWD Curves and log header data for each bit run in separate files. BIT RUN NUMBER: 9 DEPTH INCREMENT: .5000 FILE SUMMARY VENDOR TOOL CODE START DEPTH STOP DEPTH GR 11060.5 11282.0 ROP 11089.5 11310.0 $ LOG HEADER DATA DATE LOGGED: 07-JUN-97 SOFTWARE SURFACE SOFTWARE VERSION: DOWNHOLE SOFTWARE VERSION: DATA TYPE (MEMORY OR REAL-TIME): TD DRILLER (FT): TOP LOG INTERVAL (FT): BOTTOM LOG INTERVAL (FT): BIT ROTATING SPEED (RPM): HOLE INCLINATION (DEG MINIMUM ANGLE: 93.1 MAXIMUM ANGLE: 102.1 MSC 1.32 NGP 5.74, DEP 2.041, S2 MEMORY 11310.0 11092.0 11310.0 TOOL STRING (TOP TO BOTTOM) VENDOR TOOL CODE TOOL TYPE NGP NATURAL GAMMA PROBE $ BOREHOLE AND CASING DATA OPEN HOLE BIT SIZE (IN): DRILLER'S CASING DEPTH (FT): TOOL NUMBER NGP 15 3.750 3.8 BOREHOLE CONDITIONS MUD TYPE: MUD DENSITY (LB/G): MUD VISCOSITY (S) : MUD PH: MUD CHLORIDES (PPM): FLUID LOSS (C3) : RESISTIVITY (OHMM) AT TEMPERATURE (DEGF) MUD AT MEASURED TEMPERATURE (MT): MUD AT MAX CIRCULATING TERMPERATURE: MUD FILTRATE AT MT: MUD CAKE AT MT: Flo Pro 8.90 65.0 9.0 5.5 .000 .000 .000 .000 68.0 NEUTRON TOOL MATRIX: MATRIX DENSITY: HOLE CORRECTION (IN): TOOL STANDOFF (IN) : EWR FREQUENCY (HZ) : REMARKS: Data Format Specification Record Data Record Type .................. 0 Data Specification Block Type ..... 0 Logging Direction ................. Down Optical log depth units ........... Feet Data Reference Point .............. Undefined Frame Spacing ..................... 60 .lin Max frames per record ............. Undefined Absent value ...................... -999.25 Depth Units ....................... Datum Specification Block sub-type...0 .3 Name Service Order Units Size Nsam Rep Code Offset Channel DEPT FT 4 1 68 0 1 GR MWD 9 AAPI 4 1 68 4 2 ROP MWD 9 FT/H 4 1 68 8 3 First Name Min Max Mean Nsam Reading DEPT 11060.5 11310 11185.2 500 11060.5 GR 17.55 117.37 35.085 444 11060.5 ROP 6.76 106.37 49.5476 442 11089.5 Last Reading 11310 11282 11310 First Reading For Entire File .......... 11060.5 Last Reading For Entire File ........... 11310 File Trailer Service name ............. STSLIB.005 Service Sub Level Name... Version Number ........... 1.0.0 Date of Generation ....... 97/09/05 Maximum Physical Record..65535 File Type ................ LO Next File Name ........... STSLIB.006 Physical EOF File Header Service name ............. STSLIB.006 Service Sub Level Name... Version Number ........... 1.0.0 Date of Generation ....... 97/09/05 Maximum Physical Record..65535 File Type ................ LO Previous File Name ....... STSLIB.005 Comment Record FILE HEADER FILE NUMBER: 6 RAW MWD Curves and log header data for each bit run in separate files. BIT RUN NUMBER: 10 DEPTH INCREMENT: .5000 FILE SUMMARY VENDOR TOOL CODE START DEPTH GR 11274.5 ROP 11301.5 $ LOG HEADER DATA DATE LOGGED: SOFTWARE SURFACE SOFTWARE VERSION: DOWNHOLE SOFTWARE VERSION: DATA TYPE (MEMORY OR REAL-TIME): TD DRILLER (FT): TOP LOG INTERVAL (FT): BOTTOM LOG INTERVAL (FT): BIT ROTATING SPEED (RPM): HOLE INCLINATION (DEG MINIMUM ANGLE: MAXIMUM ANGLE: STOP DEPTH 11523.0 11551.5 TOOL STRING (TOP TO BOTTOM) VENDOR TOOL CODE TOOL TYPE NGP NATURAL GAMMA PROBE $ BOREHOLE A_ND CASING DATA OPEN HOLE BIT SIZE (IN): DRILLER'S CASING DEPTH (FT): BOREHOLE CONDITIONS MUD TYPE: MUD DENSITY (LB/G): MUD VISCOSITY (S): MUD PH: MUD CHLORIDES (PPM): FLUID LOSS (C3): RESISTIVITY (OHMM) AT TEMPERATURE (DEGF) MUD AT MEASURED TEMPERATURE (MT): MUD AT MAX CIRCULATING TERMPERATURE: MUD FILTRATE AT MT: MUD CAKE AT MT: NEUTRON TOOL MATRIX: MATRIX DENSITY: HOLE CORRECTION (IN): TOOL STANDOFF (IN) : EWR FREQUENCY (HZ) : 07-JUN-97 MSC 1.32 NGP 5.74, DEP 2.041, S2 MEMORY 11552.0 11310.0 11552.0 86.1 95.8 TOOL NUMBER NGP 15 3.750 3.8 Flo Pro 8.90 - 65.0 9.0 5.2 .000 .000 .000 .000 72.6 .3 REMARKS: $ · Data Format Specification Record Data Record Type .................. 0 Data Specification Block Type ..... 0 Logging Direction ................. Down Optical log depth units ........... Feet Data Reference Point .............. Undefined Frame Spacing ..................... 60 .liN Max frames per record ............. Undefined Absent value ...................... -999.25 Depth Units ....................... Datum Specification Block sub-type...0 Name Service Order Units Size Nsam Rep Code Offset Channel DEPT FT 4 1 68 0 1 GR MWD 10 AAPI 4 1 68 4 2 ROP MWD 10 FT/H 4 1 68 8 3 First Name Min Max Mean Nsam Reading DEPT 11274.5 11551.5 11413 555 11274.5 GR 21.56 116.45 35.4737 498 11274.5 ROP 24.96 705.41 61.6851 501 11301.5 Last Reading 11551.5 11523 11551.5 First Reading For Entire File .......... 11274.5 Last Reading For Entire File ........... 11551.5 File Trailer Service name ............. STSLIB.006 Service Sub Level Name... Version Number ........... 1.0.0 Date of Generation ....... 97/09/05 Maximum Physical Record..65535 File Type ................ LO Next File Name ........... STSLIB.007 Physical EOF File Header Service name ............. STSLIB.007 Service Sub Level Name... Version Number ........... 1.0.0 Date of Generation ....... 97/09/05 Maximum Physical Record..65535 File Type ................ LO Previous File Name ....... STSLIB.006 Con~nent Record FILE HEADER FILE NUMBER: 7 RAW MWD Curves and log header data for each bit run in separate files. BIT RUN NUMBER: 12 DEPTH INCREMENT: .5000 FI LE SUMMARY VENDOR TOOL CODE STAJ~T DEPTH GR 11511.5 ROP 11539.0 LOG HEADER DATA DATE LOGGED: S O FTWARE SURFACE SOFTWARE VERSION: DOWNHOLE SOFTWARE VERSION: DATA TYPE (MEMORY OR REAL-TIME): TD DRILLER (FT): TOP LOG INTERVAL (FT): BOTTOM LOG INTERVAL (FT): BIT ROTATING SPEED (RPM): HOLE INCLINATION (DEG MINIMUM ANGLE: MAXIMUM ANGLE: STOP DEPTH 11709.5 11734.5 TOOL STRING (TOP TO BOTTOM) VENDOR TOOL CODE TOOL TYPE NGP NATURAL GAlV/~k PROBE $ BOREHOLE AND CASING DATA OPEN HOLE BIT SIZE (IN): DRILLER'S CASING DEPTH (FT): BOREHOLE CONDITIONS MUD TYPE: MUD DENSITY (LB/G): MUD VISCOSITY S): MUD PH: MUD CHLORIDES PPM): FLUID LOSS (C3 : RESISTIVITY (OHF/~) AT TEMPERATURE (DEGF) MUD AT MEASURED TEMPERATURE (MT): MUD AT MAX CIRCULATING TERMPERATURE: MUD FILTRATE AT MT: MUD CAKE AT MT: NEUTRON TOOL I~TRIX: MATRIX DENSITY: HOLE CORRECTION (IN): TOOL STANDOFF (IN): EWR FREQUENCY (HZ) : REMARKS: Data Format Specification Record Data Record Type .................. 0 Data Specification Block Type ..... 0 Logging Direction ................. Down 08-JUN-97 NSC 1.32 NGP 5.74, DEP 2.041, S2 MEMORY 11736.0 11552.0 11736.0 90.7 94.6 TOOL NUMBER NGP 324 3.750 3.8 Flo Pro 8.80 65.0 9.0 6.4 .000 .000- .000 .000 77.3 .3 Optical log depth units ........... Feet Data Reference Point .............. Undefined Frame Spacing ..................... 60 .liN Max frames per record ............. Undefined Absent value ...................... -999.25 Depth Units ....................... Datum Specification Block sub-type...0 Name Service Order Units Size Nsam Rep Code Offset Channel DEPT FT 4 1 68 0 1 GR MWD 12 AAPI 4 1 68 4 2 ROP MWD 12 FT/H 4 1 68 8 3 First Name Min Max Mean Nsam Reading DEPT 11511.5 11734.5 11623 447 11511.5 GR 17.37 74.58 31.9687 397 11511.5 ROP 40.33 1087.78 85.5897 392 11539 Last Reading 11734.5 11709.5 11734.5 First Reading For Entire File .......... 11511.5 Last Reading For Entire File ........... 11734.5 File Trailer Service name ............. STSLIB.007 Service Sub Level Name... Version Number ........... 1.0.0 Date of Generation ....... 97/09/05 Maximum Physical Record..65535 File Type ................ LO Next File Name ........... STSLIB.008 Physical EOF File Header Service name ............. STSLIB.008 Service Sub Level Name... Version Number ........... 1.0.0 Date of Generation ....... 97/09/05 Maximum Physical Record..65535 File Type ................ LO Previous File Name ....... STSLIB.007 Comment Record FILE HEADER FILE NUMBER: 8 RAW MWD Curves and log header data for each bit run in separate files. BIT RUN NUMBER: 13 DEPTH INCREMENT: .5000 FILE SUMMARY VENDOR TOOL CODE START DEPTH GR 11701.0 ROP 11730.0 STOP DEPTH 12004.0 12030.0 $ LOG HEADER DATA DATE LOGGED: S O FTWARE SURFACE SOFTWARE VERSION: DOWNHOLE SOFTWARE VERSION: DATA TYPE (MEMORY OR REAL-TIME): TD DRILLER (FT): TOP LOG INTERVA~L (FT) : BOTTOM LOG INTERVAL (FT): BIT ROTATING SPEED (RPM): HOLE INCLINATION (DEG MINIMUM ANGLE: MAXIMUM ANGLE: TOOL STRING (TOP TO BOTTOM) VENDOR TOOL CODE TOOL TYPE NGP NATURAL GAMMA PROBE $ BOREHOLE AND CASING DATA OPEN HOLE BIT SIZE (IN): DRILLER'S CASING DEPTH (FT) : BOREHOLE CONDITIONS MUD TYPE: MUD DENSITY (LB/G): MUD VISCOSITY (S): MUD PH: MUD CHLORIDES (PPM): FLUID LOSS (C3) : RESISTIVITY (OHMM) AT TEMPERATURE (DEGF) MUD AT MEASURED TEMPERATURE (MT): MUD AT MAX CIRCULATING TERMPERATURE: MUD FILTRATE AT MT: MUD CAKE AT MT: NEUTRON TOOL MATRIX: MATRIX DENSITY: HOLE CORRECTION (IN): TOOL STANDOFF (IN): EWR FREQUENCY (HZ) : REMARKS: $ Data Format Specification Record Data Record Type .................. 0 Data Specification Block Type ..... 0 Logging Direction ................. Down Optical log depth units ........... Feet Data Reference Point .............. Undefined Frame Spacing ..................... 60 .liN Max frames per record ............. Undefined Absent value ...................... -999.25 Depth Units ....................... Datum Specification Block sub-type...0 09-JUN-97 MSC 1.32 NGP 5.74, DEP 2.041, S2 MEMORY 12032.0 11736.0 12032.0 85.6 89.5 TOOL NUMBER NGP 15 3.750 3.8 Flo Pro 8.90 65.0 9.5 6.1 .000 .000 .000 .000 72.6 .3 Name Service Order Units Size Nsam Rep Code Offset Channel DEPT FT 4 1 68 0 1 GR MWD 13 AAPI 4 1 68 4 2 ROP MWD 13 FT/H 4 1 68 8 3 First Name Min Max Mean Nsam Reading DEPT 11701 12030 11865.5 659 11701 GR 22.19 71.82 34.4873 607 11701 ROP 26.96 894.27 62.2034 601 11730 Last Reading 12030 12004 12030 First Reading For Entire File .......... 11701 Last Reading For Entire File ........... 12030 File Trailer Service name ............. STSLIB.008 Service Sub Level Name... Version Number ........... 1.0.0 Date of Generation ....... 97/09/05 Maximum Physical Record..65535 File Type ................ LO Next File Name ........... STSLIB.009 Physical EOF File Header Service name ............. STSLIB.009 Service Sub Level Name... Version Number ........... 1.0.0 Date of Generation ....... 97/09/05 Maximum Physical Record..65535 File Type ................ LO Previous File Name ....... STSLIB.008 Comment Record FILE HEADER FILE NUMBER: 9 RAW MWD Curves and log header data for each bit run in separate files. BIT RUN NUMBER: 14 DEPTH INCREMENT: .5000 FILE SUMMARY VENDOR TOOL CODE START DEPTH GR 11996.5 ROP 12025.0 $ LOG HEADER DATA DATE LOGGED: S O FTWARE SURFACE SOFTWARE VERSION: DOWNHOLE SOFTWARE VERSION: STOP DEPTH 12235.0 12263.0 10-JUN-97 MSC 1.32 NGP 5.74, DEP 2.041, S2 DATA TYPE (MEMORY OR REAL-TIME): TD DRILLER (FT): TOP LOG INTERVAL (FT): BOTTOM LOG INTERVAL (FT) : BIT ROTATING SPEED (RPM): HOLE INCLINATION (DEG MINIMUM ANGLE: MAXIMUM ANGLE: TOOL STRING (TOP TO BOTTOM) VENDOR TOOL CODE TOOL TYPE NGP NATURAL GAMMA PROBE $ BOREHOLE AND CASING DATA OPEN HOLE BIT SIZE (IN): DRILLER'S CASING DEPTH (FT) : BOREHOLE CONDITIONS MUD TYPE: MUD DENSITY (LB/G): MUD VISCOSITY (S) : MUD PH: MUD CHLORIDES (PPM) : FLUID LOSS (C3) : RESISTIVITY (OHMM) AT TEMPERATURE (DEGF) MUD AT MEASURED TEMPERATURE (MT): MUD AT MAX CIRCULATING TERMPERATURE: MUD FILTRATE AT MT: MTJD CAKE AT MT: NEUTRON TOOL MATRIX: MATRIX DENSITY: HOLE CORRECTION (IN): TOOL STANDOFF (IN) : EWR FREQUENCY (HZ) : REMARKS: $ Data Format Specification Record Data Record Type .................. 0 Data Specification Block Type ..... 0 Logging Direction ................. Down Optical log depth units ........... Feet Data Reference Point .............. Undefined Frame Spacing ..................... 60 .liN Max frames per record ............. Undefined Absent value ...................... -999.25 Depth Units ....................... Datum Specification Block sub-type...0 MEMORY 12253.0 12032.0 12253.0 84.5 90.7 TOOL NUMBER NGP 15 3.750 3.8 Flo Pro 8.90 65.0 9.0 5.4 .000 .000 .000 .000 77.3 .3 Name Service Order Units Size Nsam Rep Code Offset Channel DEPT FT 4 1 68 0 1 GR MWD 14 AAPI 4 1 68 4 2 ROP MWD 14 FT/H 4 1 68 8 3 Name Min Max Mean Nsam DEPT 11996.5 12263 12129.8 534 GR 23.39 63.33 31.547 478 ROP 19.89 524.3 58.8187 477 First Reading 11996.5 11996.5 12025 Last Reading 12263 12235 12263 First Reading For Entire File .......... 11996.5 Last Reading For Entire File ........... 12263 File Trailer Service name ............. STSLIB.009 Service Sub Level Name... Version Number ........... 1.0.0 Date of Generation ....... 97/09/05 Maximum Physical Record..65535 File Type ................ LO Next File Name ........... STSLIB.010 Physical EOF File Header Service name ............. STSLIB.010 Service Sub Level Name... Version Number ........... 1.0.0 Date of Generation ....... 97/09/05 Maximum Physical Record..65535 File Type ................ LO Previous File Name ....... STSLIB.009 Comment Record FILE HEADER FILE NUMBER: 10 RAW MWD Curves and log header data for each bit run in separate files. BIT RUN NUMBER: 15 DEPTH INCREMENT: .5000 FI LE SUP94ARY VENDOR TOOL CODE START DEPTH STOP DEPTH GR 12227.0 12359.0 ROP 12254.0 12383.0 $ LOG HEADER DATA DATE LOGGED: 10-JUN-97 SOFTWARE SURFACE SOFTWARE VERSION: MSC 1.32 DOWNHOLE SOFTWARE VERSION: NGP 5.74, DATA TYPE (MEMORY OR REAL-TIME): MEMORY TD DRILLER (FT): 12385.0 TOP LOG INTERVAL (FT): 12253.0 BOTTOM LOG INTERVAL (FT) : 12385.0 BIT ROTATING SPEED (RPM): HOLE INCLINATION (DEG MINIMUM ANGLE: 81.9 DEP 2.041, S2 MAXIMUM ANGLE: TOOL STRING (TOP TO BOTTOM) VENDOR TOOL CODE TOOL TYPE NGP NATURAL GAMMA PROBE $ BOREHOLE AND CASING DATA OPEN HOLE BIT SIZE (IN): DRILLER'S CASING DEPTH (FT) : BOREHOLE CONDITIONS MUD TYPE: MUD DENSITY (LB/G): MUD VISCOSITY (S): MUD PH: MUD CHLORIDES (PPM): FLUID LOSS (C3): RESISTIVITY (OHMS) AT TEMPERATURE (DEGF) MUD AT MEASURED TEMPERATURE (MT): MUD AT MAX CIRCULATING TERMPERATURE: MUD FILTRATE AT MT: MUD CAKE AT MT: NEUTRON TOOL MATRIX: MATRIX DENSITY: HOLE CORRECTION (IN): TOOL STANDOFF (IN): EWR FREQUENCY (HZ): REMARKS: $ Data Format Specification Record Data Record Type .................. 0 Data Specification Block Type ..... 0 Logging Direction ................. Down Optical log depth units ........... Feet Data Reference Point .............. Undefined Frame Spacing ..................... 60 .liN Max frames per record ............. Undefined Absent value ...................... -999.25 Depth Units ....................... Datum Specification Block sub-type...0 86.0 TOOL NUMBER NGP 176 3.750 3.8 Flo Pro 8.90 650.0 9.0 5.4 .000 .000 .000 .000 77.3 .3 Name Service Order Units Size Nsam Rep Code Offset Channel DEPT FT 4 1 68 0 1 GR MWD 15 AAPI 4 1 68 4 2 ROP MWD 15 FT/H 4 1 68 8 3 First Name Min Max Mean Nsam Reading DEPT 12227 12383 12305 313 12227 GR 20.84 166.24 51.3973 265 12227 ROP 18.37 687.01 67.7685 259 12254 Last Reading 12383 12359 12383 First Reading For Entire File .......... 12227 Last Reading For Entire File ........... 12383 File Trailer Service name ............. STSLIB.010 Service Sub Level Name... Version Number ........... 1.0.0 Date of Generation ....... 97/09/05 Maximum Physical Record..65535 File Type ................ LO Next File Name ........... STSLIB.011 Physical EOF File Header Service name ............. STSLIB.011 Service Sub Level Name... Version Number ........... 1.0.0 Date of Generation ....... 97/09/05 Maximum Physical Record..65535 File Type ................ LO Previous File Name ....... STSLIB.010 Comment Record FILE HEADER FILE NUMBER: 11 RAW MWD Curves and log header data for each bit run in separate files. BIT RUN NUMBER: 16 DEPTH INCREMENT: .5000 FILE SUMMARY VENDOR TOOL CODE START DEPTH STOP DEPTH GR 12352.5 12463.0 ROP 12362.0 12489.5 · $ LOG HEADER DATA DATE LOGGED: Il-JUN-97 SOFTWARE SURFACE SOFTWARE VERSION: DOWNHOLE SOFTWARE VERSION: DATA TYPE (MEMORY OR REAL-TIME): TD DRILLER (FT): TOP LOG INTERVAL (FT) : BOTTOM LOG INTERVAL (FT): BIT ROTATING SPEED (RPM): HOLE INCLINATION (DEG MINIMUM ANGLE: 77.5 MAXIMUM ANGLE: 80.6 TOOL STRING (TOP TO BOTTOM) VENDOR TOOL CODE TOOL TYPE NGP NATURAL GAMMA PROBE $ MSC 1.32 NGP 5.74, DEP 2.041, S2 MEMORY 12490.0 12385.0 12490.0 TOOL NUMBER NGP 176 BOREHOLE AND CASING DATA OPEN HOLE BIT SIZE (IN): DRILLER'S CASING DEPTH (FT) : BOREHOLE CONDITIONS MUD TYPE: MUD DENSITY (LB/G): MUD VISCOSITY (S): MUD PH: MUD CHLORIDES (PPM) : FLUID LOSS (C3) : RESISTIVITY (OHMM) AT TEMPERATURE (DEGF) MUD AT MEASURED TEMPERATURE (MT): MUD AT MAX CIRCULATING TERMPERATURE: MUD FILTRATE AT MT: MUD CAKE AT MT: NEUTRON TOOL MATRIX: MATRIX DENSITY: HOLE CORRECTION (IN) : TOOL STANDOFF (IN) : EWR FREQUENCY (HZ) : REMARKS: $ Data Format Specification Record Data Record Type .................. 0 Data Specification Block Type ..... 0 Logging Direction ................. Down Optical log depth units ........... Feet Data Reference Point .............. Undefined Frame Spacing ..................... 60 .liN Max frames per record ............. Undefined Absent value ...................... -999.25 Depth Units ....................... Datum Specification Block sub-type...0 3.750 3.8 Flo Pro 8.80 60.0 9.0 5.6 .000 .000 .000 .000 .3 Name Service Order Units Size Nsam Rep Code Offset Channel DEPT FT 4 1 68 0 - 1 GR MWD 16 AAPI 4 1 68 4 2 ROP MWD 16 FT/H 4 1 68 8 3 79.7 First Name Min Max Mean Nsam Reading DEPT 12352.5 12489.5 12421 275 12352.5 GR 23.79 69.85 30.8541 222 12352.5 ROP 12.04 3124.49 419.803 256 12362 Last Reading 12489.5 12463 12489.5 First Reading For Entire File .......... 12352.5 Last Reading For Entire File ........... 12489.5 File Trailer Service name ............. STSLIB.011