Department of Commerce, Community, and Economic Development
Alaska Oil and Gas Conservation
Commission
HOME
EVENTS
DATA
Data List
Drilling
Production
Orders
Data Miner
Document Search
REPORTS
Reports and Charts
Pool Statistics
FORMS
LINKS
Links
Test Notification
Data Requests
Regulations
Industry Guidance Bulletins
How to Apply
ABOUT US
History
Staff
HELP
Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
197-079
XHVZE Pages NOT Scanned in this Well History File This page identifies those items that were not scanned during the initial scanning Project. They are available in the original file and viewable by direct inspection. / ,~ ~- ~ 7 ~ File Number of Well History File PAGES TO DELETE RESCAN n Color items - Pages: [] GraYScale, halftones, pictures, graphs, charts- Pages: n Poor Quality Odginal- Pages: [] Other - pages: DIGITAL DATA n Diskettes, No. n Other, No/Type 'OVERSIZED [] .Logs of various kinds n Other Complete COMMENTS: Mildred-D'amlha~ Lov~il Scanned by: ~e~,,r~ . ~~ TO RE-SCAN Notes: Re-Scanned by: Beverly Mildred Daretha Nathan Lowell Date: /s/ ,Ad· F<ECEIVED . STATE OF ALASKA . stIftP' ALASKA OIL AND GAS CONSERVATION COMllfSSION MAY 1 0 2007 WELL COMPLETION OR RECOMPLETION REPORT AND LOG q¡;i$ka Oil & Gas Cons. Commission 1 a. Well Status: DOil DGas D Plugged ~ Abandoned D Suspended DWAG 1 b. Well Class: 20AAC 25.105 20AAC25.110 ~ Development D Exploratory DGINJ DWINJ D WDSPL No. of Completions Zero Other - D Stratigraphic D Service 2. Operator Name: 5. Date Comp., Susp., Or(A~ 1 12. Permit to 9rill Number BP Exploration (Alaska) Inc. 4/14/2007 II 197-079 307-045 3. Address: 6. Date Spudded ~~ 13. API Number P.O. Box 196612, Anchorage, Alaska 99519-6612 05/05/1997 50- 029-22765-00-OÓ 4a. Location of Well (Governmental Section): 7. Date T.D. Reached 14. Well Name and Number: Surface: 05/19/1997 PBU P2-19' 44' FNL, 1226' FWL, SEC. 14, T12N, R14E, UM 8. KB Elevation (ft): 15. Field I Pool(s): Top of Productive Horizon: 2931' FSL, 2249' FWL, SEC. 01, T12N, R14E, UM 46.50' Prudhoe Bay Field I Point ~ Total Depth: 9. Plug Back Depth (MD+ TVD) Mcintyre Pool 3700' FSL, 2669' FWL, SEC. 01, T12N, R14E, UM 14675 + 9149 Ft 4b. Location of Well (State Base Plane Coordinates): 10. Total Depth (MD+TVD) 16. Property Designation: Surface: x- 681462 y- 5998537 Zone- ASP4 15512 ' + 9639 Ft ADL 365548 TPI: x- 687553 y- 6006946 Zone- ASP4 11. Depth where SSSV set 17. Land Use Permit: Total Depth: x- 687953 y- 6007725 Zone- ASP4 NIA MD DYes ~No 19. Water depth, if offshore 20. Thickness of Permafrost 18. Directional Survey NIA MSL 1800' (Approx.) 21. Logs Run: Gyro, MWD, GR I RES I DEN I NEU I Sonic, Acoustic, GR I JB 22. CASING, LINER AND CEMENTING RECORD CASING SETTING DEPtH MD SETTING DEPTH TVD HOLE AMOl1NT Size We PER FT. GRADE Top BOTTOM Top BOTTOM SIZE · RECORD PUllED 20" 133# H-40 Surface 110' Surface 110' 30" Driven 9-5/8" 40# L-80 34' 6984' 34' 4958' 12-1/4" 1783 sx Coldset III 590 sx Class 'G' 7" 26# I 29# L-80 /13Cr80 31' 14718' 31' 9175' 8-1/2" 460 sx Class 'G' 23. Perforations open to Production (MD + TVD of Top and 24. ... UBING RECORD ." ..... >.; . Bottom Interval, Size and Number; if none, state "none"): SIZE DEPTH SET (MD) PACKER SET (MD) None 4-1/2", 12.6#,13Cr80 14340' 14293' MD TVD MD TVD ...... ß~MAY 2 2 2007 25. ACID,. FRACtuRE,CEMENtSOLJEEZE,ETC. ....... DEPTH INTERVAL (MD) AMOUNT & KIND OF MATERIAL USED 14454' Set Whipstock 14459' P&A wI 20 Bbls Class 'G' Cement 26. ..., ~f<.'" PRODUCTION TEST Date First Production: Method of Operation (Flowing, Gas Lift, etc.): Not on Production NIA Date of Test Hours Tested PRODUCTION FOR OIL-BBL GAs-McF WATER-BBL CHOKE SIZE GAS-OIL RATIO TEST PERIOD ~ Flow Tubing Casing Pressure CALCULATED OIL -BBL GAs-McF WATER-BBL OIL GRAVITY-API (CORR) Press. 24-HoUR RATE+ 27. CORE DATA Brief description of lithology, porosity, fractures, apparent dips and presence of oil, gas or water (attach separate sheet, if necessary). Submit core chips; if none, state "none". A&4Y1J~ None ~~}jiwl !e~~L.. ~ . Form 10-407 Revised 12/2003 CONTINUED ON REVERSE SIDE ORIGINAl RBDMS 8Ft MAY .2 1 2007 b 28. GEOLOGIC MARKE 29. ORMATION TESTS NAME MD TVD Include and brie ummarize test results. List intervals tested, and attach detailed supporting data as necessary. If no tests were conducted, state "None". Top West Sak 10655' 6912' None Top K-12 1 0830' 7008' Top Kuparuk 14424' 8995' 30. List of Attachments: Summary of Pre-Rig Work and Daily Drilling Reports, Well Schematic Diagram 31. I ~erebY certify that the ~ng i: true and correct to the best of my knowledge. Signed Terrie Hubble Title Technical Assistant Date OS /J O/D PBU P2-19 Well Number 197-079 307-045 Permit No. I A roval No. Prepared By NameINumber: Drilling Engineer: Terrie Hubble, 564-4628 Sean McLaughlin, 564-4387 INSTRUCTIONS GENERAL: This form is designed for submitting a complete and correct well completion report and log on all types of lands and leases in Alaska. ITEM 1a: Classification of Service Wells: Gas Injection, Water Injection, Water-Alternating-Gas Injection, Salt Water Disposal, Water Supply for Injection, Observation, or Other. Multiple completion is defined as a well producing from more than one pool with production from each pool completely segregated. Each segregated pool is a completion. ITEM 4b: TPI (Top of Producing Interval). ITEM 8: The Kelly Bushing elevation in feet above mean low low water. Use same as reference for depth measurements given in other spaces on this form and in any attachments. ITEM 13: The API number reported to AOGCC must be 14 digits (ex: 50-029-20123-00-00). ITEM 20: True vertical thickness. ITEM 22: Attached supplemental records for this well should show the details of any multiple stage cementing and the location of the cementing tool. ITEM 23: If this well is completed for separate production from more than one interval (multiple completion), so state in item 1, and in item 23 show the producing intervals for only the interval reported in item 26. (Submit a separate form for each additional interval to be separately produced, showing the data pertinent to such interval). ITEM 26: Method of Operation: Flowing, Gas Lift, Rod Pump, Hydraulic Pump, Submersible, Water Injection, Gas Injection, Shut-In, or Other (explain). ITEM 27: If no cores taken, indicate "None". ITEM 29: List all test information. If none, state "None". Form 10-407 Revised 1212003 Submit Original Only Digital Wellfile . Page 1 of 2 . Well: P2-19 Well Events for SurfaceWell - P2-19 Location: BP -> ALASKA -> GREATER PRUDHOE BAY -> GPMA -> P2 -> P2-19 Date Range: 08/Jan/2007 to 11/Apr/2007 Data Source(s): AWGRS Description PULL 4" CIW BPV THRU BOP'S RIG JOB API VALVE SHOP T/I/0=600/0/0 TBG Load (Pre CTD) Pumped 10 bbls neat meth followed by 220 bbls 1 % KCL and 45 bbls DSL for a freeze protect down TBG. Final WHP's =480/0/0 SET 4" CIW BPV PRE RIG WORK API VALVE SHOP *** CONT FROM 04-07-07 WSR *** PULLED 3" BAKER IBP FROM 14,283'SLM, ELEMENTS RECOVERED. *** WELL LEFT S/I *** *** WELL SI ON ARRIVAL *** (pre ctd) STDBY FOR RIG MOVE TO ACCESS P2-19 TO PULL IBP. *** JOB IN PROGRESS/ CONT ON 04-08-07 WSR *** IBP MONTHLY RENTAL FOR 02/08/07 - 04/08/07. MOs 2 & 3. NOTE IBP SET 01/08/07. NOTE: CTD ST SCHEDULED MID-APRIL; WATCH FOR PLUG PULLED. T/I/0=0/500/0. PPPOT-T (PASS), PPPOT-IC (PASS). CTD screen. FMC. Casing head: 95/8" x 11" 5m w/ (1) 2" FMC model 120 OA valve. Tubing head: 11" 5m x 11" 5m w/ (2) 2" FMC model 120 IA valves. Tubing head adapter: 11" 5m x 4" 5m. Tree: 4" Cameron FLS w/ Baker actuator. PPPOT-T: Stung into test void to check pressure (600 psi), bled pressure to 0 psi (gas/fluid). Pressured void to 5000 psi for 30 min test, lost 100 psi in 30 min, PASS. Functioned all LDS, no sign of bent or broken pins. PPPOT-IC: Stung into test void to check pressure (600 psi), bled pressure to 0 psi (gas). Pressured void to 3000 psi for 30 min test, no loss of pressure, PASS. Functioned all LDS, no sign of bent or broken pins. 8\1iGRS P2-19 01/25/2007 ** CONT FROM 1-24-07 WSR** (pre sdtrk) PULLED 1" INT- DMY FROM STA 1 @ 5247' MD (TOP SET OF PACKING MISSING -BTM SET TORN UP) SET 1" INT-DMMY GLV (EXT PACKING) @ 5247' MD MIT-IA TO 3000 PSI W/TRIPLEX (PASSED) PULLED SS CATCHER SUB (EMPTY) . *****NOTE:---- RAN DECENTRALIZER @ 2:00 TO PULL AND SET STA # 1 GLV . ** TURNED WELL OVER TO DSO, LEFT SHUT IN ** AWGRS P2-19 01/24/2007 ***WELL S/I ON ARRIVAL *** (pre sdtrk) SET 4 1/2 SLIP STOP CATCHER @ 5372' SLM. RAN MULTIPLE CONFIGURATIONS TO TRY AND PULL STA.# 1 W/ NO SUCCESS CURRENTLY ATTEMPTING TO PULL STA.# 1 W/ DECENT, CLOCK SET @ 2:00 O'CLOCK ** CONT ONTO 1- 25-07 WSR** AWGRS P2-19 01/15/2007 T/I/0=225/250/40 Assist E-Line LDL (CTD Screening) - Pump as directed down IA. Pumped 262 bbls 65*F crude down IA taking returns up tbg to production, while E-line logging LDL. Freeze protect flowline w/10 bbls neat meth. FWP's = 220/220/40 AWGH...';j P2-19 01/15/2007 ***CONTINUED FROM 14-JAN-2007*** RAN LDL LOG AND FOUND THAT GLM #1 AT 5,250' WAS LEAKING. NO FLOW OF TEMPERATURE ANOMALIES BELOW GLM #1. MADE 40 FPM UP/DOWN PASSES AND STOP COUNTS ABOVE AND BELOW GLM TO CONFIRM LEAK. LEAK APPEARS TO BE IN MIDDLE OF GLM, POSSIBLY A LEAKING VALVE. PUMPED 262 BBLS 65*F CRUDE DOWN IA AT 1 BPM @ 2200 PSI DURING ENTIRE JOB. LRS PUMPED FREEZE PROTECT MEOH DOWN FLOW LINE AFTER JOB. ***JOB COMPLETE*** ARRIVED AT WELLSITE, RIGGED UP. PRESSURE TESTED TO 3000 PSI. CHECKED TOOLS AND RIH @ 120 FPM. ***CONTINUED ON 15-JAN-2007*** T/I/0=250/250/10. Temp=SI. TBG & IA FL's. (for FB). TBG FL @ Surface. IA FL @ Surface. ***Continued from 1-10-07 WSR*** LLR IA (CTD Screen) - Pumped 15 bbls neat methanol to work/clear ice plug from flow line. LLR IA to tbg (IBP in hole) to production through wing valve. LLR=1.3 bpm @ 3000 psi. CMIT TxIA 3000 psi ***PASSED*** Pumped 4 bbls O*F crude down IA to pressure up TxIA to 3000 psi. T/IA lost 20/10 psi in 1st 15 min. T/IA lost 20/10 psi in 2nd 15 min. Bleed TxlA via IA. TP tracked down w/IAP. Final WHP's=40/100/40 Freeze protect flow line w/14 bbls neat methanol T/I/O= 700/76010 Temp= SII MIT IA**FAILED***to 3000 psi (CTD Screen) Pumped 3 bbls crude down IA while tubing tracking. ***Continued on 1-11-07 WSR*** T/I/O= 675/780/0 MIT-T to 3000 psi, PASSED / MIT-OA to 2000 psi, PASSED (CTD Screen) Pressured up TBG to 3000 psi with 2.7 bbls crude.Start testing, 1st test tubing lost 100 psi in 15 min, Lost 100 psi in 2nd 15 min, Bump up w/ .2 bbls crude, 2nd test lost 50 psi in 15 min, Lost 50 psi in 2nd 15 min, PASS, Bleed TP, RD tubing RU OA MIT OA to 2000 psi (Passed) - Pressure OA to 2000 psi w/ 6.3 bbls crude. OA Loss 40 psi 1st 15 min & loss 20 psi 2nd 15 min. Bled OA to 0 psi. FWHP's=700/700/0 AWGRS P2-19 01/08/2007 T/I/O= 2000/860/20 Assist E-line. Pumped 315 bbls of crude down tubing. Final WHP= 1000/960/40. Events Source Well Date AWGJSS P2-19A 04/11/2007 AWGRS P2-19 04/08/2007 AWGRS P2 -19 04/08/2007 AWGRS P2-19 04/08/2007 A\liGRS P2-19 04/07/2007 AWGRS P2-19 04/02/2007 AWGRS P2-19 02/02/2007 AWGRS P2-19 01/14/2007 AWGRS P2-19 01/13/2007 AWGRS P2-19 01/11/2007 AWGRS P2-19 01/10/2007 AWGßS P2-19 01/10/2007 http://digitalwellfile. bpweb. bp.comIW ellEvents/Home/Default.aspx 5/3/2007 Digital Wellfile AW'GRS P2-19 01/08/2007 . Page 2 of2 T/I/O 2200/880/40.2 STRAND 80 GRAIN STRING S.OVER INTERVAL 14,317-14,329 FT. SET BAKER 3" IBP @ 14,323' MID-ELEMENT. 6.5' FROM MID ELEMENT TO TOP OF PLUG. TOP OF IBP AT 14,316.5'. T/I/O 1000/880/40 ***JOB COMPLETE*** NOTE FOR E-LlNE: IN ORDER TO OBTAIN LDL TEMPERATURE DATA BELOW PACKER, GRADIQ AND/OR PILS WILL HAVE TO BE DROPPED FROM TOOLSTRING. http://digitalwellfile.bpweb.bp.com/W ellEvents/Home/Default. aspx 5/3/2007 Legal Well Name: Common Well Name: Event Name: Contractor Name: Rig Name: P2-19 P2-19 REENTER+COMPLETE NORDIC CALISTA NORDIC 1 Start: 4/1 0/2007 Rig Release: 4/24/2007 Rig Number: N1 Spud Date: 3/24/1997 End: 4/24/2007 4/10/2007 00:00 - 02:30 2.50 MOB P PRE Turnkey rig move from G-04B to P2-19A 02:30 - 05:30 3.00 MOB N WAIT PRE Rig on standby while waiting on adjacent wells to be bled off by production operator. 05:30 - 06:00 0.50 MOB P PRE PJSM. MIRU over P2-19A Accept rig at 0600 hrs on 04/10107. 06:00 - 09:00 3.00 BOPSU P PRE PJSM on RU and testing BOPs, greased tree valves, NU BOP's, Notify AOGCC Jeff Jones of BOP test wI 2 hour notice 09:00 - 19:30 10.50 BOPSU P PRE Conduct BOP testing. Chart recorded, as well as electronically recorded by SLB. Jeff Jones of AOGCC witnessed testing. Tested gas detection system with Jeff Jones as well. Kill line check valve failed. Get replacement check valve from Nordic 2. 19:30 - 22:30 3.00 RIGU P PRE Press test hardline to Tiger tank with rig. Had to function valves to get press test. Hardline crew did not have a test pump available. 22:30 - 00:00 1.50 BOPSU RREP PRE Remove damaged kill line check valve and flanged XO. 4/11/2007 00:00 - 03:30 3.50 BOPSU RREP PRE N/U kill line check valve with flanged connections. 03:30 - 05:00 1.50 BOPSU PRE Pressure test connections on each side of check valve and body test check valve to 3500 psi. Press test check valve, 250/3500 psi. Chart test. 05:00 - 05:15 0.25 BOPSU PRE SAFETY MEETING. Review procedure, hazards and mitigation for rig up and pull BP Valve. 05:15 - 08:30 3.25 BOPSU PRE R/U and attempt to pull BPV using lubricator. Master valve shut initially thought was ice - 1 hour. Opened master and had ice on top of BPV. Thaw with steam on area in cellar. Able to screw into BPV. but not able to turn to release BPV. 08:30 - 08:35 0.08 BOPSU PRE PJSM for pumping thru BPV. 08:35 - 09:00 0.42 BOPSU PRE RU and bullhead 5 bbls of methanol thru BPV from kill line. 480psi below BPV. 09:00 - 10:00 1.00 BOPSU PRE Pull the BPV with no issues. RD the lubricator. 10:00 - 10:15 0.25 KILL WEXIT Prep to stab coil into injector. 10:15- 10:30 0.25 KILL WEXIT PJSM for stabbing coil. 10:30 - 11 :30 1.00 KILL WEXIT Stab coil into injector. 11 :30 - 11 :45 0.25 KILL WEXIT PJSM for connecting CTC and bull heading down well. 11 :45 - 13:35 1.83 KILL WEXIT Bullhead 450bbls of 9.4 brine down to kill well. Attach CTC while bullheading down well. 13:35 - 14:05 0.50 KILL P WEXIT Flowcheck well. Well on vacuum. 14:05 - 14:20 0.25 CLEAN P WEXIT PJSM for PU BHA #1. Fill coil simultaneously. 14:20 - 15:00 0.67 CLEAN P WEXIT Complete filling coil and PT CTC. Good test 15:00 - 20:00 5.00 CLEAN P WEXIT RIH with BHA #1 to mill XN nipple. 1.5bpm/.3bpm - 1.2bpm losses. Slowed rate to .4 bpm with no returns to wait on fluids. 20:00-21:15 1.25 CLEAN P WEXIT Tag XN at 14,336' and correct depth to 14.317', -19' CTD. Mill window with 2.6 bpm, 2480 psi. 0.7 bpm returns. Mill thru XN down to 14,323'. Back ream, Ream down. Ream up clean. 21:15 - 21:30 0.25 CLEAN P WEXIT RIH with mill to 14,580'. 2.0 BPM, 1.4 bpm returns. Cleaned out to 20' below bottom perfs. Getting almost full returns after cleaning out below perfs. Fill plugged up loss zone. 21 :30 - 00:00 2.50 CLEAN P WEXIT POH. pump 1.0 bpm, 0.4 bpm returns at 80 fpm. Flagged coil at 14,200' EOP. POH. 4/12/2007 00:00 - 00: 15 0.25 CLEAN P WEXIT POH with 3.80" LH milling BHA. 0.2 bpm losses at surface. Held kick while trip drill. Good response. Printed: 4/3012007 11 :49:52 AM Legal Well Name: Common Well Name: Event Name: Contractor Name: Rig Name: P2-19 P2-19 REENTER+COMPLETE NORDIC CALISTA NORDIC 1 Start: 4/10/2007 Rig Release: 4/24/2007 Rig Number: N1 Spud Date: 3/24/1997 End: 4/24/2007 4/12/2007 00:15 - 00:30 0.25 CLEAN P WEXIT Layout LH milling BHA. Mill gauged at 3.79 Go I 3.78 NoGo. 00:30 - 02: 15 1.75 CLEAN P WEXIT M/U SWS CTC. Pull test with 35K. Press test with 3500 psi. MIU BOT Underreamer BHA to cleanout 7" casing. BOT DB UR, motor, circ sub, disc, 2 jts PH6, checks and CTC. OAL = 86.65'. 02:15 - 05:00 2.75 CLEAN P WEXIT RIH with UR BHA #2. No pump. Full retums. Correct to flag at 14,286'. -15' CTD. RIH to 14,470'. 45K up wt and 18 K down wt with no pump. 05:00 - 08:25 3.42 CLEAN P WEXIT Underream down at 5 fpm, 2.5 bpm, 2700 psi, 2.2 bpm returns. 18K down wt. one stall at 14550', so blades are out. UR down to 14,570'. 2.6 bpm, 1.7- 2.3 bpm returns. bpm retu rns. Back ream up to 14,450' and underream down again at 5 fpm to 14,570'. Back ream up to 14,450' and underream down a third time at 5 fph to 14,570'. Returns varied from 1.6 to 2.4 bpm on first pass and stayed steady at 2.4 bpm on second pass. 08:25 - 11 :45 3.33 CLEAN P WEXIT Drop ball to open circulation sub and POOH. Left 30bbls of flo-pro mud on bottom and chased 30 bbls of flo-pro out of hole. Pumping at 2.5 bpm with 1.5bpm returns while POOH. PJSM for LD tools and RU SL. 11 :45 - 15:00 3.25 CLEAN P WEXIT LD reaming assembly. Rig-up SLB slickline with SL BOP and lubricator. Zero depth at rig floor at bottom of dummy WS. 15:00 - 18:00 3.00 CLEAN P WEXIT Attempt to run Dummy WS drift (3.7" x 17') on SL down to 14,570'. Tag on fill at 14,515' multiple times. POOH. 18:00 - 18:40 0.67 CLEAN P WEXIT Layout dummy WS and M/U PDS memory Caliper logging tool. Zero depth at rig floor. 18:40 - 21:30 2.83 CLEAN P WEXIT RIH and set down at 14,526', not tied-in. Log up wtih memory caliper to 14,000'. POH. 21 :30 - 22:30 1.00 CLEAN P WEXIT Layout PDS memory caliper tool. Download memory data to confirm casing PBTD and ID. 22:30 - 00:00 1.50 CLEAN P WEXIT Rig down SWS slickline. PDS caliper tied-in at bottom of tailpipe, indicated a PBTD of 14,484'. Talk to Anc engineer and determine to set top of whipstock at 14,454'. ID of 7" casing is clean at setting point with a caliper ID of 6.27". 4/13/2007 00:00 - 03:00 3.00 WHIP N WAIT WEXIT Wait for SWS E-Line unit. Prepare equipment at SWS shop and drive to location. 03:00 - 04:00 1.00 WHIP P WEXIT Held rig evacuation drill and H2S drill. Crew evacuated rig to muster area. Reviewed H2S hazards and procedures for rig evacuation with H2S alarm. All personnel accounted for. 04:00 - 07:45 3.75 WHIP P WEXIT R/U SWS E-Line to run BOT whipstock. R/U BOT whipstock on catwalk and orient for highside set. 07:45 - 08:00 0.25 WHIP P WEXIT PJSM for installing RA tags in WS, arm setting tool and PUlRIH e-line BHA. 08:00 - 08:15 0.25 WHIP P WEXIT Install 3 RA tags in WS 10.0' down from top of whipstock. Arm Printed: 413012007 11 :49:52 AM Legal Well Name: Common Well Name: Event Name: Contractor Name: Rig Name: P2-19 P2-19 REENTER+COMPLETE NORDIC CALISTA NORDIC 1 Start: 4/10/2007 Rig Release: 4/24/2007 Rig Number: N1 Spud Date: 3/24/1997 End: 4/24/2007 4/13/2007 08:00 - 08:15 0.25 WHIP P WEXIT setting tool. PU WS BHA on E-line. 08:15 - 09:45 1.50 WHIP N SFAL WEXIT Attempting to arm setting tool. Problems with the SLB explosives testing meter(ohm meter). 09:45 - 10:55 1.17 WHIP P WEXIT PU WS BHA on eline. 10:55 - 14:10 3.25 WHIP P WEXIT RIH with WS on eline. Currently losing at 20 bbls/hr. 14:10 - 15:20 1.17 WHIP P WEXIT Tie-in to depth with GR and CCL log. Correction of -17'. Set WS at 14,454' with 4 deg LOHS orientation. Good weight indication - 28751bs prior, 2370lbs after setting. Tagged TOWS after setting and took weight. 15:20 - 18:30 3.17 WHIP P WEXIT POOH with 100psi shut-in to prevent swabbing. 18:30 - 18:45 0.25 WHIP P WEXIT SAFETY MEETING. Review procedure, hazards and mitigation for rigging down SWS E-Line tools. 18:45 - 19:45 1.00 WHIP P WEXIT Rig down SWS E-Line. 19:45 - 21 :00 1.25 ZONISO P WEXIT MIU Cementing nozzle BHA. 21 :00 - 00:00 3.00 ZONISO P WEXIT RIH with cementing nozzle BHA. Tag wipstock pinch point at 14,469'. correct -20' to 14,449'. Pick up to 14,400' and circ at 0.5 bpm, 100 psi. RIU SWS cementing equipment. 4/14/2007 00:00 - 00:15 0.25 ZONISO P WEXIT RIU SWS Cementing equipment. 00:15 - 00:30 0.25 ZONISO P WEXIT SAFETY MEETING. Review procedure, hazards and mitigation for pumping cement. 00:30 - 01 :25 0.92 ZONISO P WEXIT Batch up cement, 20 bbls G cement at 15.8 ppg. 4 hrs thickening time. Cement at weight at 0100 hrs. Stage 5 bbls water. Press test cement line. Coil capacity = 58 bbl. 01 :25 - 02:20 0.92 ZONISO P WEXIT Stage 20 bbls, 15.8 ppg, G Cement, 2.0 bpm, 1000 psi, 1.4 bpm returns. Stage 5 bbls water behind to clean cement line. Displace with rig pump with 9.2 ppg Brine. 20 bbl displ, 2.3 bpm, 1200 psi, 1.6 bpm returns 35 bbl displ, close choke and reduce pump to 1.6 bpm. 250 whp. 38 bbl displ, cement at nozzle, 1.6 bpm, 340 siwhp, Nozzle at 14,450'. 45 bbl displ, 1.0 bpm, 200 pp, 400 siwhp, 7 bbls squeezed away. 50 bbl displ, 1.0 bpm, 400 pp, 500 siwhp, 12 bbls squeezed away, 51 bbl displ, 1.0 bpm, 750 pp, 650 siwhp, 13 bbls squeezed, lay in 1/1 at 27 fpm. 55 bbl displ, 1.0 bpm, 1000 pp, 800 siwhp, nozzle at 14300'. Pull at 66 fpm in 4-1/2" 58 bbl displ, 1.0 bpm, 750 pp, 450 siwhp, CMT out nozzle, TOC at 14,130'. pull to safety at 13,970'. 46K up wt. 02:20 - 03:30 1.17 ZONISO P WEXIT SIWHP dropped to 40 psi, 6 bbls cement left to squeeze. Hesitate 10 min. Sqz 1 bbl at 0.5 bpm, 80 siwhp, wait 10 min. Sqz 1 bbl at 0.5 bpm, 20 siwhp, wait 15 min. Sqz 1/2 bbl, wait 15 min. 30 siwhp. Sqz 1/2 bbl, wait 15 min. 30 siwhp. Printed: 413012007 11 :49:52 AM · . Legal Well Name: Common Well Name: Event Name: Contractor Name: Rig Name: P2-19 P2-19 REENTER+COMPLETE NORDIC CALISTA NORDIC 1 Start: 4/1 0/2007 Rig Release: 4/24/2007 Rig Number: N1 Spud Date: 3/24/1997 End: 4/24/2007 4/14/2007 03:30 - 03:45 03:45 - 05:15 05:15 - 08:00 ~ p,z..\<1,Pt 08:00 - 08:15 08:15 - 09:15 09:15 - 10:00 10:00 - 12:40 :40 - 14:40 14:40 - 16:40 16:40 - 18:00 18:00 - 20:00 20:00 - 22:00 22:00 - 00:00 4/15/2007 00:00 - 01 :00 01:00 - 03:15 03:15 - 05:45 05:45 - 07:00 07:00 - 08:45 08:45 - 09:00 09:00 - 09:30 09:30 - 09:45 09:45 - 10:45 10:45 - 11 :00 11 :00 - 13:00 0.25 ZONISO P WEXIT 1.50 ZONISO P WEXIT 2.75 ZONISO P WEXIT 0.25 ZONISO P 1.00 ZONISO P 0.75 STWHIP P 2.67 STWHIP P 2.00 HIP P WEXIT WEXIT WEXIT WEXIT WEXIT 2.00 STWHIP P WEXIT 1.33 STWHIP P WEXIT 2.00 STWHIP P WEXIT 2.00 STWHIP P WEXIT 2.00 STWHIP P WEXIT 1.00 STWHIP P 2.25 STWHIP P WEXIT WEXIT 2.50 STWHIP P 1.25 STWHIP P WEXIT WEXIT 1.75 STWHIP P WEXIT 0.25 DRILL P PROD1 0.50 DRILL P PROD1 0.25 DRILL P 1.00 DRILL P 0.25 DRILL P 2.00 DRILL P PROD1 PROD1 PROD1 PROD1 Wait 15 min, pump 1/2 bbl, 200 siwhp, finally getting a sqz press. Wait 15 min, pump 1/2 bbl, 250 siwhp, Wait 15 min, pump 1/2 bbl, 450 psi siwhp at 0415 hrs. Hold 500 psi squeeze press for 30 min. Start RIH and circ 30 bbl Biozan at 2.4 bpm with full returns. Dress off cement to 10' above top of whipstock at 14,444'. 2.4 bpm, 1430 psi. Pull to tailpipe and RIH again to 14,444'. Full returns. POH while chasing Biozan pill I cement to surface. 2.6 bpm, 1900 psi. PJSM for jetting stack and swapping BHA's. Jet stack LD swizzle stick and PU window milling BHA. RIH to mill window. Tag cement and mill down to p,nc pOint. 19K. Mill from 14,464'-14469.5'. Correct-11'CTD. Pinchpoint now at 14458.5'. Start to time mill at 1'/hr. 2.45bpm/2.36bpm, WOB 2-4k Ibs, 1700-1900 psi, FS 1510 psi. Mill to 14462'. 2.45bpm/2.37bpm, WOB 5-6.5k, 1700-2025psi. FS 1510 psi. Mill to 14464'. 2.42bpm/2.35bpm, WOB 6-7.5k, 1700-2025psi. FS 1510 psi. Mill 3.8" window thru 7" liner. 2.5 bpm, 1700-2000 psi, 0.5 fph. Milled to 14,465'. Mill 3.8" window thru 7" liner. 2.5 bpm, 1700-2000 psi, 0.5 fph. Milled to 14,466'. Milled out of liner at 14,466'. Milled formation to 14,473' at 4 fph. 2.5 bpm, 1900 psi, full returns. Milled formation to 14,477'. 2.5 bpm, 1900 psi, 4 fph. Ream window up and down. Swap to new 9.3 PPG FloPro. 2.5 bpm, 2400 psi, Ream up I down 3 times. Clean window. Full returns. Dry tag OK. POH with milling BHA. 2.5 bpm, 2450 psi. Layout window milling BHA. Mill and string reamer gauged at 3.80" Go 13.79" No Go. M/U swizle stick nozzle. Shut in swab. Jet stack with swizle stick. Meanwhile RlU N2 pumpers. PJSM & THA for BID CT with N2. Made 2 additions to procedure. Pump 50bbls of water ahead followed by 10bbls of MeOH spacer. PIT N2 lines - OK. Blow down CT with N2 & bleed down. PJSM & THA for stripping off & pulling back CT to the reel. P/U injector & cut off CTC. Prep end of CT for internal grapple. Slip grapple connector into CT, M/U & pull test. Strip-off CT from injector & spool back CT stub to reel. Secure CT with Printed: 4/3012007 11 :49:52 AM TREE = 4-1/16"5M CHROME WELLHEAD = FMC CTUA R = BAKER C KB. ELEV = 47.6' BF. ELEV = KOP= Max Angle = Datum MD = Datum 1VD = . P -19 A CTD Sidetrack ~ NOTES: 7" CHROME CSG & 4·1/2" .OMETBG 1381' 98 @ 14755' 14203' 8800' SS . 2068' -1 4-1/2" CAMCO BAL-O SVLN, ID = 3.812" I 9-5/8" CSG, 40#, L-80, 10 = 8.835" I Minimum ID = 2.37" @ 14,896' XO TO 2.875" STL LINER ST MO 1VD 1 5247 3996 2 8022 5501 3 9544 6307 4 10640 6889 5 11581 7410 6 12515 7912 7 14114 8794 8 14266 8884 GAS LIFT MANDRELS OEV TYÆ VLV LATCH 59 KBG-2-LS DMY INT 59 KBG-2-LS DMY INT 58 KBG-2-LS DMY INT 57 KBG-2-LS DMY INT 56 KBG-2-LS DMY INT 57 KBG-2-LS OMY INT 54 KBG-2-LS DMY INT 53 KBG-2-LS DMY INT PORT DATE o 12/07/06 o o 12/07/06 o o o o o TOPOF 3-3/16" LNR I I Top of Cement H 135" X Nip 2813" IDH 14317' 14293' 7" X 4-1/2" BA KER S-3 PKR, ID = 3.875" 7" CSG, 26#, L-80, ID = 6.276" I 14316' 4-1/2" OTIS X NIP, ID = 3.813" I 14327' 4-112" OTIS XN NIP, ID = 3.8" (milled out to 3.8") 14-1/2" TBG, 12.6#, 13CR, .0152 bpf, 10 = 3.958" 1--1 14339' I 4-1/2" TUBING TAIL, WLEG ELMO TT LOGGED 06114/97 PERFORA TION SUMMARY REF LOG: SWS MCNL 1 GR 1 CCL OF 04/13/07 ANGLEATTOPÆRF: 96 @ 15090' Note: Refer to Production DB for historical perf data SIZE SPF INTERV AL Opn/Sqz DA TE 2 6 15090 - 15370 0 04/23/07 2 6 15400 - 15760 0 04/23/07 2 6 15810 - 16030 0 04/23/07 7" CSG, 29#, 13CR, .0371 bpf, ID = 6.184" I 14716' DATE 05/23/97 09/18/01 02/18/03 06/17/05 12/07/06 04/23/07 REV BY COMMENTS ORIGINAL COMPLETION RNlTP CORRECTIONS MS/tlh CORRECTIONS RAClPJC CORRECTION TBG TAIL, WLEG JLJITLH GL V CIO RRW CTD HORIZONTAL SIDETRACK DATE REV BY COMMENTS POINT MCINTYRE UNrr WELL: P2-19A ÆRMrr No: '207012 API No: 50-029-22765-01 SEC14 T12N R14E2649.36 FEL 1531.15 FNL BP Exploration (Alaska) Schlumbepger Alaska Data & Consulting Services 2525 Gambell Street, Suite 400 Anchorage, AK 99503-2838 ATTN: Beth Iq?-07~ 02/12/2007 NO. 4131 Company: State of Alaska Alaska Oil & Gas Cons Comm AUn: Christine Mahnken 333 West 7th Ave, Suite 100 Anchorage. AK 99501 Field: Prudhoe Bay . Well Job# Log Description Date BL Color CD L5-25 11538589 LDL 12/28/06 1 Y-16 11626467 LDL 01/19/07 1 L-04 11603118 MEM LDL 12/30/06 1 11-24A 11638611 USIT 01/24/07 1 1-33 11631645 USIT 01/09/07 1 A-05A 11533393 USIT 01/04/07 1 DS 05-10B 11626469 SCMT 01/22/07 1 W-29 11536193 USIT 01/05/07 1 R-15A 11626266 USIT (CEMENT EVALUATION) 01111/07 1 R-15A 11626266 USIT (CORROSION) 01/11/07 1 MPF·99 11637306 CEMENT EVALUATION/CBL 01/14/07 1 R-12 11414757 RST 09/01/06 1 1 NK-38A 40011271 OH EDIT MWD/LWD 03/11/05 3 1 NK-38A PB1 40011271 OH EDIT MWD/LWD 02/26/05 2 1 MPC-28A 11649937 MEM INJECTION PROFILE 01/05/07 1 DS 07 -04A 11533394 LDL 01/05/07 1 F-23A 11626066 LDL 01/08/07 1 P2-19 11630449 LDL 01/14/07 1 Y-09A 11630450 LDL 01/16/07 1 . PLEASE ACKNOWLEDGE RECEIPT BY SIGNING AND RETURNING ONE COpy EACH TO: BP Exploration (Alaska) Inc. Petrotechnical Data Center LR2-1 900 E. Benson Blvd. Anchorage, Alaska 99508 Date Delivered: SCANNED FEB 2 1 2007 Alaska Data & consf1!1)@f/fðeE' IVE"~ 2525 Gambell Street,~« V...·.. R .,;:, Anchorage, AK 99503-2838 ATTN: Beth Received by: FEB 2 0 Z001 JCJ i\!~ka Oil &. Gas (',cns. Cnmmisßiol'! Anchorage . ~ü&\üŒ lID~ &\~&\~æ&\ . A..,A~1iA. OILAlQ) GAS CONSERVATION COMMISSION SARAH PAUN, GOVERNOR 333 W. 7th AVENUE, SUITE 100 ANCHORAGE, ALASKA 99501-3539 PHONE (907) 279-1433 FAX (907) 276-7542 Sean Mclaughlin CT Drilling Engineer BP Exploration (Alaska) Inc. P.O. Box 196612 Anchorage,AK,99519-6612 Re: Prudhoe Bay Field, Point McIntyre Oil Pool, PBV P2-19 Sundry Number: 307-045 () 1 q SCANNED FEB 0 1 2007 \ <\ '\ -' Dear Mr. Mclaughlin: Enclosed is the approved Application for Sundry Approval relating to the above referenced well. Please note the conditions of approval set out in the enclosed form. When providing notice for a representative of the Commission to witness any required test, contact the Commission's petroleum field inspector at (907) 659-3607 (pager). As provided in AS 31.05.080, within 20 days after written notice of this decision, or such further time as the Commission grants for good cause shown, a person affected by it may me with the Commission an application for rehearing. A request for rehearing is considered timely if it is received by 4:30 PM on the 23rd day following the date of this letter, or the next working day if the 23rd day falls on a holiday or weekend. A person may not appeal a Commission decision to Superior Court unless rehearing has been requested. Sincerely, DATED this ~D day of January, 2007 Enc!. --- n ,_'"' 1. Type of Request: 181 Abandon o Suspend o Operation Shutdown o Perforate irJE'-~ \. ß I .. V ¡:;:, LJ o Ti e Exten'!loTr- o Alter Casing o Repair Well o Plug Perforations o Stimulate o Re-En~A~sfree~'tYB~ o Change Approved Program o Pull Tubing o Perforate New Pool o Waiver o Other '¡iaska Oi! & Gas r.nnll ..... 2. Operator Name: 4. Current Well Class: 5. Permit TArR1Yb~ber BP Exploration (Alaska) Inc. 1&1 Development D Exploratory 197 -079 .r 3. Address: D Stratigraphic D Service 6. API Number: P.O. Box 196612, Anchorage, Alaska 99519-6612 50-029-22765-00-00 / 7. If perforating, closest approach in pool(s) opened by this operation to nearest 8. Well Name and Number: property line where ownership or landownership changes: PBU P2-19 ./ Spacing Exception Required? DYes 1&1 No 9. Property Designation: J 110. KB Elevation (ft): / 11. Field / Pool(s): ,/ ADL 365548 46.50 Prudhoe Bay Field / Point Mcintyre Pool 4'" ........}i" ,·..........i.i..........,,··· ," . "~i. ....,.... ..../( >' ....·iii...····· ·...;,·...;.!.;...i,./.· . VV!;;;L .."..,..... ... Total Depth MD (ft): Total Depth TVD (ft): Effective Depth MD (ft): Effective Depth TVD (ft): Plugs (measured): Junk (measured): 15512 - 9639 ~ 14675 9149 None None Casino Lenath Size M[ TVD Burst CollaDse Structural Conductor 110' 20" 110' 110' Surface 6950' 9-5/8" 6984' 4958' 5750 3090 Intermediate Production 14687' 7" 14718' 9175' 7240 !'i410 Liner Perforation Depth MD (ft): I Perforation Depth TVD (ft): I Tubing Size: Tubing Grade: Tubing MD (ft): 14416' - 14560' 8990' - 9079' 4-1/2", 12.6#, 13CR80 14339' Packers and SSSV Type: 7" x 4-1/2" Baker S-3 Packer packers and SSSV MD (ft): 14293' 13. Attachments: 14. Well Class after proposed work: 1&1 Description Summary of Proposal D BOP Sketch D Exploratory 1&1 Development D Service D Detailed Operations Program 15. Estimated Date for 16. Well Status after proposed work: Commencina Operations: February 15, 2007 DOil DGas D Plugged 181 Abandoned 17. Verbal Approval: Date: DWAG DGINJ DWINJ D WDSPL Commission Representative: 18. I hereby certify that the foregoing is true and correct to the best of my knowledge. Contact Sean McLaughlin, 564-4387 Printed Name Sean McLaughlin Title CT Drilling Engineer Signature ~M/l~ Date 1/1..tÞ Prepared By Name/Number: Phone 564-4387 Sondra Stewman, 564-4750 Commission Use Only # . Conditions of approval: Notify Commission so that a representative may witness I Sundry Number:~7 - ð4? D Plug Integrity ~OP Test D Mechanical Integrity Test D Location Clearance Other: ~dC) t,,><è\ ~\.~ \.""~""-'\.. ~~ ~"::>\ <:.... \ \ <s L \ \::.. '- Subsequent Form Required: '-\ CJ' APPROVED BY Date j" ØD ,fJt' ADDroved Bv: OMMISSIONER THE COMMISSION Form 10-403 Revised 06/2006 ORIGÎNÁL '-- RBDMS BFL Submit In Duplicate (I J 20Dí . STATE OF ALASKA ~~,..o11 k2> ~~ ALASKA OIL AND GAS CONSERVATION tOMMI ION ~r,^ /. -.3 APPLICATION FOR SUNDRY APPROVAL ) 7 -Pt/O 20 AAC 25 280 . . To: Tom Maunder Petroleum Engineer Alaska Oil & Gas Conservation Commission Obp From: Sean McLaughlin CTD Engineer Date: January 24, 2007 Re: P2-19 Sundry Approval Sundry approval is requested for well P2-19. P2-19 was completed in July, 1997 with three perforated intervals in the upper and lower UC1 and the UB3/4. The water cut increased rapidly and the production rates declined. A pre-completion CBL showed the cement quality to be poor and predicted future water shutoff work. A PPROF obtained 10/4/97 indicated water flow from the bottom of the lowest set of perfs. In April of 1998, the entire wellbore was squeezed. 24 barrels of cement were placed behind pipe. A CBL obtained 4/14/98 showed good bond throughout the entire squeezed interval. A 100' interval was perforated from the UC1 down thru the top ofthe UB3. Production improved post squeeze but not dramatically. Oil rate continued to decline in both 1998 and 1999. Decline rates for both oil and GFR accelerated in 2000 until the well was SI. Hot oil treatments and a scale cleanout were attempted to restore production in May 2000. The well was left SI until the top 20' ofthe UC1 and top 13' of the UB4 were re-perforated. A scale inhibition treatment followed the re- perforation operation. Stable production was established and the well produced until 1 Q06 when it was shut in for high watercut (100%). A FCO to mill the scale in 5/06 made no improvement in oil rate and the well remained shut-in. \ . C'\. \ _ \ '----? ~ ~('C)~c..~ "'--\. \M-~ ~ REASON FOR SIDETRACK: ~~\ ~ \.J....J The objective of the sidetrack is to improve sweep and increase oil recovery by accessing otherwise unrecoverable reserves on the northern periphery of the field. The current parent well is shut in due to excessively high water cut, and there are no viable water-shut-off or other remediation options available. The well is a similar field-edge play to the successful P2-11A and P2-36A horizontal wells drilled in April/May 2006. The well has risk due to the thinning oil column and possibly limited reservoir rock quality/permeability. However, if the well produces at high-water cut after a short time, the sidetrack can still have significant value as a peripheral injector, improving sweep to both P2-14 and P2-33B producers. The sidetrack i~d;l0B.~: a:gl1~ ~~h 7, 2007. The sidetrack, P2-19A, will exit the existing 7" casing into the B4 and tar t U 1 a raD The existing perforations will be isolated by a cement squeeze. The following describes work planned and is submitted as an attachment to Form 10-403. A schematic diagram of the proposed sidetrack is attached for reference. Pre-Rig Work: 1. 0 MIT -OA and CMIT TxIA (both passed) Done 2. C Mill XN nipple then clean out to 14,500' -use 3.8" mill and left hand motor 3. C Underream whipstock setting area 14,400' to 14,500' 4. S Dummy GLV#l 5. S Rummy Baker dummy WS drift (3.7" x 17') to 14500'. 6. S Caliper from 14500' 7. 0 MIT-IA 8. E Set Baker 4-1/2" x 7" whipstock at 14520' highside. r-e>ooo~o "'~ I 9. C Squeeze 13 bbl of 15.8 ppg cement past WS to isolate perfo tions 10. 0 AC-LDS; AC-PPPOT-IC, T 11. 0 Install accumulator for TRSSSV 12. 0 Bleed gas lift and production flowlines down to zero and blind flange 13. 0 Remove wellhouse, level pad The pre CTD work is slated to begin on Feb 15th, 2006. ~\ Rig Work: 1. MIRV and test BOPE to 250 psi low and 3500 psi high. 2. Mill 3.8" window at 14,520'and 10' of rat hole. Swap the well to Flo-Pro. 3. Drill Build: 4.125" OH, 205' (45 deg/l00 planned) 4. Drill Lateral: 4.125" OH, 2275' (12 deg/lOO planned), with resistivity 5. Run 3-3/16" 2-7/8" solid liner leaving TOL at 14305' 6. Pump primary cement leaving TOC at 14305' 7. Cleanout liner and MCNLlGRlCCL log 8. Test liner lap to 2000 psi. 9. Perforate liner per asset instructions (~700') 10. Freeze protect well, Set BPV, RDMO \~<) ~,\L i"'L<2:- ~ LtC) 1. Post-Rig Work: 1. Move wellhouse, Install production flowline 2. Pull BPV 3. RunGLVs 4. Flowback well to separator Sean McLaughlin CTD Engineer 564-4387 CC: Well File Sondra StewmanlTerrie Hubble TREE = 4~'1/16"5M CHROME W8.LHEAD = FMC ACTUATOR = BAKERC KB. ELEV = 47.6' BF. ELEV = KOP= Max Angle = Datum MD = DatumTVD= P2-19 NOTES: 7" CHROMECSG& 4-1/2" OME TBG IPB 2068' H 4-1/2" CAMCO BAL-O SVLN, ID = 3.812" I . 6982' -µ ~ GAS LIFT MANDR8.S ST MD TVD DEV TYÆ VLV LA TCH PORT DATE 1 5247 3996 59 KBG-2-LS DMY INT 0 12/07/06 2 8022 5501 59 KBG-2-LS DMY INT 0 4327' 3 9544 6307 58 KBG-2-LS DMY INT 0 12/07/06 4 10640 6889 57 KBG-2-LS DMY INT 0 L 5 11581 7410 56 KBG-2-LS DMY INT 0 6 12515 7912 57 KBG-2-LS DMY INT 0 7 14114 8794 54 KBG-2-LS DMY INT 0 8 14266 8884 53 KBG-2-LS DMY INT 0 6" I 13530' µ , t8: ~ I 14293' H 7" X 4-1/2" BAKER S-3 PKR, ID = 3.875" I ........ I 14316' H 4-1/2" OTIS X NIP, ID = 3.813" I . I I 14327' H 4-1/2" OTIS XN NIP, ID = 3.725" I 8" H 14339' I I 14339' H 4-1/2" TUBING TAIL, WLEG I I 14329' H 8.MD TT LOGGED 06/14/97 I Y I ON OS/21/97 14416' rical perf data Sqz DATE 06/27/97 04/20/98 02/16/01 06/27/97 02/16/01 06/27/97 TD 14675' 4" I 14716' I I 1381' 60 @ 3936' 14203' 8800' SS 9-5/8" CSG, 40#, L-80. ID = 8.835" I Minimum ID = 3.725" @ 1 OTIS XN NIPPLE 7" CSG, 26#, L-80, ID = 6.27 14-1/2" TBG, 12.6#, 13CR, .0152 bpf, ID = 3.95 ÆRFORA TION SUMMAR REF LOG: SÆRRY SUN GR-EWR4 ANGLE AT TOP ÆRF: 52 @ Note: Refer to A"oduction DB for histo SIZE SPF INTERVAL Opn/ 3-3/8" 6 14416 - 14446 S 3-3/8" 6 14424 - 14524 0 3-3/8" 6 14432 - 14452 0 3-3/8" 6 14470 - 14500 S 3-3/8" 6 14494 - 14507 0 3-3/8" 6 14540 - 14560 S 7" CSG, 29#, 13CR, .0371 bpf, ID = 6.18 DATE OS/23/97 09/18/01 02/18/03 06/17/05 12/07/06 REV BY COMMENTS ORIGINAL COM PLETION RN/TP CORRECTIONS MS/tlh CORRECTIONS RAClPJC CORRECTION TBG TAIL, WLEG JLJ/l1.H GL V ClO DATE REV BY COMMENTS POINT MCINTY RE UNrr W8.L: P2-19 ÆRMrr No: 1970790 API No: 50-029-22765-00 SEC14 T12N R14E 2649.36 FEL 1531.15 FNL BP Exploration (Alaska) : 7" CHROME CSG & 4-1/2" CHROME TOO @ 14327' 3-3/8" 3-3/8" 3-3/8" 3-3/8" 3-3/8" 3-3/8" PERFORA TION SUMMA RY REF lOG: SPERRY SUN GR-EWR4 ON OS/21/97 ANGLE AT TOP PERF: 52 @ 14416' Note: Refer to Production DB INTERVAL 14416 - 14446 14424 - 14524 14432 - 14452 14470 - 14500 14494 - 14507 14540 - 14560 6 6 6 6 6 6 s o o s o s 06/27/97 04/20/98 02/16/01 06/27/97 02/16/01 06/27/97 POINT MCINTYRE UNIT WELL: PERMIT No: 1970790 A PI No: BP Exp'oratitUI (Alas Ita) Ol' 3gFORg c:LORIXI~I~M-DOC STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMMISSION REPORT OF SUNDRY WELL OPERATIONS . 1. Operations performed: Operation shutdown_ Stimulate_ Plugging_ Pertorate _X Pull tubing _ Alter casing _ Repair well _ Other _ 2. Name of Operator 5. Type of Well: 6. Datum elevation (DF or KB feet) BP Exploration (Alaska), Inc. Development__X RKB 46.5 feet 3. Address Explorato~__ 7. Unit or Property name P. O. Box 196612 Stratigraphic__ Anchorage, AK 99519-6612 Service Point Mclntyre Unit 4. Location of well at surface 8. Well number 42' FNL, 4054' FEL, Sec. 14, T12N, R14E, UM (asp's 681462, 5998537) P2-19 At top of productive interval 9. Permit number / approval number 2350' FNL, 3023' FEL, Sec. 1, T12N, R14E, UM (asp's 687561, 6006944) 197-079 At effective depth 10. APl number 50-029-22765 At total depth 11. Field / Pool 1581' FNL, 2600' FEL, Sec. 1, T12N, R14E, UM (asp's 687962, 6007723) Point Mclntyre Oil Pool 12. Present well condition summary Total depth: measured 15512 feet Plugs (measured) Tagged PBTD @ 14507' 2/16/2001 true vertical 9639 feet Effective depth: measured 14507 feet Junk (measured) true vertical 9046 feet Casing Length Size Cemented Measured Depth True vertical Depth Conductor 110' 20" Ddven 1 1 0' 1 10' Surface 6936' 9-5/8" 1783 sx CS IH & 59o sx cs ~ 6982' 4956' Production 14671' 7" 460 Sx C~ass G 14716' 9174' RECEi' Perforation depth: measured 14416'- 14524'; 14540'- 14560'. ~L., true vertica18976'-9042'; 9052'- 9065'. Mt~ 0 .~ ~001 Alaska Oil & Gas Cons. Commission Tubing (size, grade, and measured depth) 4-1/2", 12.6#, 13CR Tbg @ 14339' MD. Anchorage Packers & SSSV (type & measured depth) BAKER S-3, 7" X 4-1/2" PAKER, ID=3.875" @ 14293' MD. 4-1/2" CAMCO BAL-O SVLN, ID=3.812" - WRDP POOH 4/26/00 @ 2068' MD. 13. Stimulation or cement squeeze summary Intervals treated (measured) (see attached) Treatment description including volumes used and final pressure 14. Representative Daily Average Production or Injection Data OiI-Bbl Gas-Mcr Water-Bbl Casing Pressure Tubing Pressure Prior to well operation (shut/n) - - Subsequent to operation 979 853 3733 718 15. Attachments 16. Status of well classification as: Copies of Logs and Surveys run __ Daily Report of Well Operations __X Oil __X Gas __ Suspended __ Service 17. I hereb~tify that the f~regoing is true and correct to the best of my knowledge. Signed Title: GPMA Surveillance Engineer Date ~,,.,'~,~ --'~3 W. L. Mathew-" s Prepared by Paul Rauf 564-5799 Form 10-404 Rev 06/15/88 · SUBMIT IN DUPLICATE P2-19 DESCRIPTION OF WORK COMPLETED PERFORATING OPERATIONS Date Event Summary 1/20/2001: 2/03/2001: 2/16/2001: RIH & pulled 4-1/2" WRDP2 SSA. Tagged PBTD @ 14508' MD. RIH &tagged PBTD @ 14507' ELM. MIRU ELU. PT'd equip to 3000 psi. RIH w/perforating guns & tagged PBTD @ 14507' MD. Did tie-in & shot 33' of reperfs located @: 14432'- 14452' MD Reference Log: SWS CBT/CET 6/14/1997. 14494' - 14514' MD Used 3-3/8" carriers & all shots @ 6; SPF, random orientation, 60° phasing, & underbalanced press. POOH w/guns - ASF. RD ELU. Placed well BOL & obtained a representative well test. MAR 0 1 2OOl Alaska Oil & Gas Cons. Commission Anchorage Page 1 STATE OF ALASKA ALASKA AND GAS CONSERVATION COMMIS ~1 REPORT ~JF SUNDRY WELL OPERATIuNS · Operations performed: Operation shutdown __ Pull tubing __ Alter casing __ Stimulate __ Plugging__~ Perforate ~_ Repair well __ Other__ 2. Name of Operator ARCO Alaska, Inc. 3. Address P.O. Box 100360, Anchorage, AK 99510 ¢. Location of well at surface 42' FNL, 4054' FEL, Sec. 14, T12N, R14E At top of production interval 2933' FSL, 2247' FWL, Sec. 1, T12N, R14E At effective depth At total depth 1531' FNL, 2649' FEL, Sec. 1, T12N, R14E 5. Type of Well: Development Exploratory Stratigraphic Service Datum elevation (DF or KB) KB 46.3 feet 7. Unit or Property name POINT MCINTYRE UNIT 8. Well number P2-19 9. Permit number/approval number 97-79 / 0. APl number 500292276500 11. Field/Pool Point Mclntyre 12. Present well condition summary Total Depth: measured: Effective Depth: Casing Conductor Surface Intermediate Liner 14718 feet Plugs (measured) None. true vertical: 9161 feet measured: 14675 feet Junk (measured) None. true vertical: 9135 feet Length Size Cemented Measured depth 110' 20" Driven 110' 6982' 9 5/8" 1783 sx Coldset III & 6982' 590 sx 'G' 13530' 7" 460 sx Class G 13530' True vertical depth 110' 4940' 8468' Perforation depth: measured 14416-14424', 14424-14446', 14446-14470', 14470-14500', 14500-14524', 14540-14560' true vertical 8929-8934', 8934-8948', 8948-8962', 8962-8981 ', 8981-8996', 9005-9018' Tubing (size, grade, and measured depth) RECEIVED 4 1/2 in. 12.6# 13CR @ 0-14339' MD, Packers and SSSV (type and measured depth) JUL 22 1999 3 7/8 x 6 2/7 PKR @ 14293' MD, 3 4/5 x 4 1/2 SSSV @ 2068' MD 13. Stimulation or cement squeeze summary Intervals treated (measured) Treatment description including volumes used and final pressure Please refer to attached. AIasNa 0it & Gas Cons. Commission Anchorage ORIGINAL 14. OiI-Bbl Gas-Mcf Prior to well operation n/a n/a Subsequent to operation 2583 1702 15. Attachments Copies of Logs and Surveys run Daily Report of Well Operations _~- Representative Daily Average Production or Iniection Data Water-Bbl J16. Casing Pressure Tubing Pressure n/a n/a n/a 2871 769 763 Status of well classification as: Oil x_~ Gas __Suspended __ 17. I hereby ~?..~qat th~oreg~?,~,s, true and correct to the best of my knowledge. Signed ~~,~ ~-"'_~~ Title Service Form 10-404 Rev 06/15/88 SUBMIT IN DUPLICATE P2-19 Add Perforations 6/27/97 1 RU service company. Held pre-job safety meeting. 2 Obtain radio silence. Arm Gun #1 3 RIH w/20', 3.375" Gun 4 Shot gun at 14540-14560' MD, at 0 psig. WHP jumped to 1100 psi. Good fire; TOOH 5 Arm Gun #2 6 RIH with CCL w/30', 3.375" Gun 7 Shot gun at 14470-14500' MD. No change in pressure. Good fire; TOOH 8 ARM Gun #3 9 RIH with CCL w/30', 3.375" Gun 10 Shot gun at 14416-14446; 200 psi underbalanced. Good fire; TOQH 11 RD and release service company Summary Perforated 14416-14446' and 14470-14500' MD at 6 spf, 60 degree phasing P2-19 Water Shut-off Squeeze 4/7/98 1 RU service company. Held pre-job safety meeting. 2 Squeeze all perforations with 24 BBP LARC (15 BBL with aggregate). Final squeeze pressure is 3500 psi for one hour. Cleaned out to PBTD @ 14643' MD. FP tubing to 2500' with crude. Secured well with 800 psi 3 RD and release service company. Returned well to operations Well: P2-19 SSSV -- NIPPLE PKR -- NIP -- NIP -- WLEG -- Perf -- Perf -- Perf -- Perf ~ GPMA WEB Date: 4113199 APl: 500292276500 SSSV Type: CAT I - SSSV Annular Fluid: DIESEL T Reference Log: Last Tag: 14620' SLMD-CORR Last Tag Date: 6/23/98 Well Type: PROD Orig Compltn: 5/23/97 Last W/O: Ref Log Date: TD: 15512 ftKB Max Hole 60 deg @ 3936 Angle: Angle @ TS: deg @ Angle @ TD: 53 deg @ 15512 Rev Reason: TAG Last Update: 11/29/98 Date Note 5/31/97 Minimum ID: 3.725" OTIS ×N NIPPLE @ 14327' MD :Gene~l::N°tes :: i : I ID 3.812 3.875 3.813 3.725 4.000 Date Note 5/31/97 Well Status: ACTIVE 5/31/97 Tubing Hanger: 4 1/23 CIW~ @ 29' MD Last Tag Depth @ 14718 Top Of Fluid Depth @ 14416 Other(plugs,: equip, etc.)- JEWELRY Depth TVD Type Description 2068 2020 SSSV 4-1/2" CAMCO BAL-O SVLN, ID=3.812" - WRDP RIH 5/26/98 NIPPLE 14293 8900 PKR BAKER S-3, 7"X 4-1/2" PAKER, ID=3.875" 14316 8914 NIP OTIS X NIPPLE, ID=3.813" 14327 8921 NIP OTIS 'XN' NIPPLE, ID=3.725" 14339 8928 WLEG TUBING TAIL, WLEG ( 14329' ELMD) Casihg Strings-All :: : Size Weight Grade Top Btm Feet Description 9.625 40.00 L-80 0 6982 6982 SURF. CASING 7.000 26.00 L-80 0 13530 13530 PROD. CASING 7.000 29.00 13CR 13530 14716 1186 PROD. CASING Tubi~gStrings-All:: : Size Weight Grade Top Btm Feet Description 4.500 12.60 13CR 0 14339 14339 TUBING Gas Eiff Mandrels/Valves: Stn MD TVD Man Man VMfr VType Mfr Type 5247 3996 CAMCO KBG-2-LS CA BK-1 (9CR) 2 8022 5501 CAMCO KBG-2-LS CA DK-1 (9CR) 3 9544 6307 CAMCQ KBG-2-LS CA BK-1 (9CR) 4 10640 6889 CAMCO KBG-2-LS CA DKO-2 (9CR) 5 11581 7410 CAMCO KBG-2-LS CA DK-1 (9CR) 6 12515 7912 CAMCO KBG-2-LS CA DK-1 (9OR) 7 14114 8794 CAMCO KBG-2-LS CA DK-1 (9CR) 8 14266 8884 CAMCO KBG-2-LS CA DK-1 (9CR) Perforations Summary :: ::::: Interval TVD 14416- 14424 14424- 14446 14446- 14470 1447O- 145OO 14500- 14524 14540- 14560 8976-8981 8981-8994 8994-9009 9009-9028 9028-9042 9052-9065 V OD Latch Port TRO Date Vlv Run Comment 1.0 TEGR~0.250 2352 4/25/98 GLM 1.0 TEGFb0.000 1.0 TEGR~0.375 1.0 TEGI~0.000 1.0 TEGRJ0.000 1.0 TEGR¢0.000 1.0 TEGR~0.000 1.0 TEGRJ0.000 0 5/31/97 GLM 0 4/25/97 GLM 0 3/21/98 GLM 0 5/31/97 GLM 0 5/31/97 GLM 0 5/31/97 GLM 0 5/31/97 GLM Zone Status Feet SPF Date Type Comment 8 6 6/27/97 3-3/8" GUNS - Squeezed 4/7/98 22 12 4/20/98 3-3/8" GUNS - Post squeeze reperfs 24 6 4/20/98 3-3/8" GUNS - Post squeeze reperfs 30 12 4/20/98 3-3/8" GUNS - Post squeeze reperfs 24 6 4/20/98 3-3/8" GUNS - Post squeeze reperfs 20 6 6/27/97 3-3/8" GUNS - Squeezed 4/7/98 PERMIT DATA ......... AOGCC Individual Well Geological Materials Inventory T DATA PLUS Page: 1 Date: 05/24/99 RUN RECVD 97-079 M_AC/GR 5/24/97 97-079 MAC/GR 5/29/97 97-079 DIR SRVY 97-079 CBL 97-079 CET 97-079 DGR/CNP/SLD-TVD 97-079 DGR/EWR4-TVD 97-079 DGR/CNP/SLD-MD 97-079 DGR/EWR4-MD 97-079 7754 97-079 8054 97-079 GYRO MULTI SHOT 97-079 PROD-SPIN/TEM/ 97-079 PROD-SPIN/TEM/ 97-079 CET 97-079 PROD 97-079 PROD-DEFT ~13250-14666 ~ 13250-14666 ~0-15512. ~F~4225-14685 ~8765-9577 .~14147-15512 ~/14147-15512 ~SPERRY MPT/GRC/EWR4/CNP/ROD 1 06105/97 1 06105/97 06118/97 1 07/03/97 1 07~03/97 FINAL 08/06/97 FINAL 08/06/97 FINAL 08/06/97 FINAL 08/06/97 3 08/06/97 1 07/31/97 FINAL 11/05/97 FINAL 07/24/98 FINAL 09/24/98 FINAL 09/24/98 ~SCHLLIM PDC/GR ~/~GGYRODATA 0-14600 09/22/97 ~RES/DEFT Z3990-14600 ~O/~ F~AL lZ/05/97 ~o66o-1466~ .1~/ R ~ 7/7"/ Ct?~ TO ~/~?/~t?/ 10-407 DAILY WELL OPS dry ditch samples required? yes ~And Are received? Was the well cored? yes °~.~_Analysis & description received? Are well tests required?~es ~:Received? ye-s_~o Well is in compliance ~ Initial COMMENTS yes no BOX GeoQuest 500 W. International Airport Road Anchorage, AK 99518-1199 ATTN: Sherrie NO. 11500 Company: Alaska Oil & Gas Cons Comm Attn: Lori Taylor 3001 Porcupine Drive Anchorage, AK 99501 Field: Lisburne Floppy Well Job # Log Description Date BL RF Sepia Disk Color Print P2-17 -~ ~r~ 98470 CET/CBT ~'0C 980819 I I 1 P2-19 PRODUCTION PROFILE 9 807 09 I 1 P 2-19 PRODUCTION PROFILE DEFT IMAGES 98 07 09 I 1 P2-27 PRODUCTION PROFILE W/DEFT 9 8 0 817 I I SIGNED: Please sign and return one copy of this transmittal to Sherrie at the above address. Thank you. DATE: STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMMISSION WELL COMPLETION OR RECOMPLETION REPORT AND LOG 1. Status of Well Classification of Service W~li [] Oil [] Gas [] Suspended []Abandoned [] Service ' i~ .~ · ',~ ','' ,.". 2. Name of Operator 7. Permit Numt~ ":'-* ¢~- ~;.'. ARCO Alaska Inc. 97-79 · E~/~.,,,~ ?,_.¢ ?~' 3. Address 8. APl Number '~.'-;~?~, P.O. Box 196612, Anchorage, Alaska 99519-6612 50-029-22765 7/¢t; %~,.~. i~u~'~""~'L~-I°*'-=-~'~'~'~~lr.,X;A'tlCll~ 9. Unit or Lease Nam;4'¢4?~ 4. Location of well at surface ~ DA-rE , i Point Mclntyre 44' SNL, 1226' EWL, SEC. 14, T12N, R14E, UM ~ ,..~./,_ .~.,/~! ~1;;?~ At top of productive interval i 10. Well Number 2933 NSL, 2247 EWL, SEC. 1 T12N, R14E, UM '~ED ~ ' ' ,i P2-19 At total depth --¢~c--~4_..- ...... ~ ~ 11. Field and Pool 3680' NSL, 2672' EWL, SEC. 1, T12N, R14E, UM Point Mclntyre 5. Elevation in feet (indicate KB, DF, etc.) 16. Lease Designation and Serial No. KBE = 46.5'I ADL 365548 , 12. Date Spudded5/5/97 113' Date T'D' Reached I 14' Date C°mp" Susp" °r Aband'115' water depth' if °fish°re 16' N°' °f C°mpleti°ns5/19/97 6/27/97' N/A MSL One 17. Total Depth (MD+TVD) 118. Plug Back Depth (MD+TVD)I19. Directiori~tl Survey ]20. Depth where SSSV set121. Thickness of Permafrost 15512 9661 FTI 14675 9149 FTI [~Yes []NoI 2069' MDI 1800' (Approx.) 22. Type Electric or Other Logs Run ~ 0 R I ~'~! NAI Gyro, MWD, GR/RES/DEN/NEU/Sonic, Acoustic, GR/JB v .--- 23. CASING, LINER AND CEMENTING RECORD CASING SE%I-lNG DEPTH HOLE SIZE WT. PER FT. GRADE TOP BOTTOM SIZE CEMENTING RECORD AMOUNT PULLED 20" 133# H-40 Surface 110' 30" Driven 9-5/8" 40# L-80 34' 6984' 12-1/4" 1783 sx Coldset 111,'590 sx 'G' 7" 26#/29# L-80/13CR80 31' 14718' 8-1/2" 460 sx Class 'G' 24. Perforations open to Production (MD+TVD of Top and 25. TUBING RECORD Bottom and interval, size and number) SIZE DEPTH SET (MD) PACKER SET (MD) 3-3/8" Gun Diameter, 6 spf 4-1/2", 12.6#, 13CR80 14340' 14293' MD TVD MD TVD 14416'-14446' 8990'-9008' 14470'-14500' 9023'-9042' 26. AC~D, FRACTURE, CEMENT SQUEEZE, ETC. 14540'-14560' 9066'-9078' DEPTH INTERVAL (MD) AMOUNT & KIND OF MATERIAL USED Freeze protect with 376 bbls diesel 27. PRODUCTION TEST Date First Production I Method of Operation (Flowing, gas lift, etc.) 07/03/97 [ Gas Lift Date of Test Hours Tested PRODUCTION FOR OIL-DEL GAS-MCF WATER-DEL CHOKE SIZE IGAs-OIL RATIO iTEST PERIOD I Flow Tubing Casing Pressure CALCULATED OIL-BBL GAS-MCF WATER-DEL OIL GRAWTY-API (CORR) Press. 24-HOUR RATE .... 28. CORE DATA Brief description of lithology, porosity, fractures, apparent dips and presence of oil, gas or water. Submit core chips. Form 10-407 Rev. 07-01-80 Submit In Duplicate 29. Geologic Markers 30. Formation Tests Measured True Vertical Include interval tested, pressure data, all fluids Marker Name Depth Depth recovered and gravity, GOR, and time of each phase. Top West Sak 10655' 6912' Top K-12 10830' 7007' Top Kuparuk 14424' 8995' ,.-?~ :'i':.-, "/ ? ? , ,'~..' ' ':'/'~._!/;~~.-~ 31. List of Attachments Summary of Daily Drilling Reports, Surveys bes, Signed SteveShu~ Title Senior Drillin9 Engineer Date / - P2-19 '- ""' ~ 97-7~ Prepared By Name/Number: Kathy Campoamor, 564-5122 Well Number Permit No. / Approval No. INSTRUCTIONS GENERAL: This form is designed for submitting a complete and correct well completion report and log on all types of lands and leases in Alaska. ITEM 1: Classification of Service Wells: Gas injection, water injection, steam injection, air injection, salt water disposal, water supply for injection, observation, injection for in-situ combustion. ITEM 5: Indicate which elevation is used as reference (where not otherwise shown) for depth measurements given in other spaces on this form and in any attachments. ITEM 16 AND 24: If this well is completed for separate production from more than one interval (multiple completion), so state in item 16, and in item 24 show the producing intervals for only the interval reported in item 27. Submit a separate form for each additional interval to be separately produced, showing the data pertinent to such interval. ITEM 21: Indicate whether from ground level (GL) or other elevation {DF, KB, etc.). ITEM 23: Attached supplemental records for this well should show the details of any multiple stage cementing and the location of the cementing tool. ITEM 27: Method of Operation: Flowing, Gas Lift, Rod Pump, Hydraulic Pump, Submersible, Water Injection, Gas Injection, Shut-In, Other-explain. ITEM 28: If no cores taken, indicate 'none'. Form 10-407 Rev. 07-01-80 Facility Date/Time 05 May 97 06 May 97 07 May 97 08 May 97 09 May 97 10 May 97 11 May 97 Pt Mac 2 Progress Report Well P2-19 Rig Doyon 14 Page Date 11:30-12:00 12:00-14:00 14:00-15:00 15:00-17:30 17:30-18:00 18:00-20:00 20:00-21:30 21:30-06:00 06:00-06:00 06:00-13:30 13:30-14:00 14:00-14:30 14:30-15:00 15:00-06:00 06:00-12:00 12:00-15:00 15:00-15:30 15:30-22:30 22:30-23:00 23:00-00:30 00:30-01:30 01:30-03:30 03:30-06:00 06:00-07:30 07:30-16:00 16:00-17:00 17:00-18:00 18:00-21:00 21:00-23:00 23:00-00:00 00:00-00:30 00:30-03:00 03:00-06:00 06:00-07:00 07:00-07:45 07:45-08:00 08:00-17:00 17:00-18:45 18:45-19:00 19:00-19:30 19:30-21:00 21:00-22:00 22:00-23:45 23:45-00:00 00:00-00:15 00:15-01:00 01:00-01:30 01:30-03:30 03:30-05:00 05:00-06:00 06:00-07:00 07:00-08:00 08:00-09:30 09:30-13:30 Duration 1/2hr 2hr lhr 2-1/2 hr 1/2 hr 2hr 1-1/2 hr 8-1/2 hr 24 hr 7-1/2 hr 1/2 hr 1/2 hr 1/2 hr 15hr 6hr 3hr 1/2 hr 7hr 1/2 hr 1-1/2 hr lhr 2hr 2-1/2 hr 1-1/2 hr 8-1/2 hr lhr lhr 3hr 2hr lhr 1/2 hr 2-1/2 hr 3hr lhr 3/4 hr 1/4 hr 9hr 1-3/4 hr 1/4 hr 1/2 hr 1-1/2 hr lhr 1-3/4 hr 1/4 hr 1/4 hr 3/4 hr 1/2 hr 2hr 1-1/2 hr lhr lhr lhr 1-1/2 hr 4hr Activity Skid rig Installed Bell nipple Installed Kelly/top drive hose Made up BHA no. 1 Held safety meeting Cleared Bell nipple Made up BHA no. 1 Drilled to 1146.00 ft Drilled to 3922.00 ft (cont...) Drilled to 4554.00 ft (cont...) Circulated at 4554.00 ft Pulled out of hole to 3606.00 ft R.I.H. to 4554.00 ft Drilled to 6183.00 ft Drilled to 6463.00 ft (cont...) Repaired Kelly/top drive hose Drilled to 6494.00 ft Worked stuck pipe at 6449.00 ft Circulated at 6449.00 ft Worked stuck pipe at 6449.00 ft Circulated at 6419.00 ft Pulled out of hole to 4255.00 ft R.I.H. to 5983.00 ft Reamed to 6494.00 ft Drilled to 6997.00 ft Circulated at 6997.00 ft Circulated at 6997.00 ft Pulled out of hole to 1800.00 ft R.I.H. to 6997.00 ft Circulated at 6997.00 ft Dropped EMSS survey barrel Pulled out of hole to 275.00 ft Pulled BHA Serviced Block line Rigged up Casing handling equipment Held safety meeting Ran Casing to 6983.00 ft (9-5/8in OD) Circulated at 6983.00 ft Held safety meeting Pumped Water spacers - volume 70.000 bbl Mixed and pumped slurry - 470.000 bbl Displaced slurry - 510.000 bbl Circulated at 6983.00 ft Held safety meeting Pumped Water spacers - volume 25.000 bbl Mixed and pumped slurry - 330.000 bbl Displaced slurry - 152.000 bbl Serviced Bell nipple Rigged down Casing handling equipment Rigged down Kelly/top drive hose Rigged down Kelly/top drive hose (cont...) Serviced Flowline Installed Casing spool Rigged up BOP stack 1 27 August 97 Facility Date/Time 12 May 97 13 May 97 14 May 97 15 May 97 16 May 97 17 May 97 18 May 97 Pt Mac 2 Progress Report Well P2-19 Rig Doyon 14 Page Date 13:30-16:00 16:00-21:00 21:00-06:00 06:00-23:00 23:00-00:00 00:00-00:15 00:15-00:30 00:30-03:00 03:00-04:00 04:00-05:00 05:00-06:00 06:00-06:30 06:30-09:30 09:30-11:00 11:00-11:30 11:30-13:00 13:00-13:30 13:30-14:00 14:00-15:30 15:30-16:00 16:00-17:15 17:15-17:30 17:30-18:00 18:00-06:00 06:00-20:00 20:00-21:00 21:00-23:00 23:00-00:30 00:30-01:30 01:30-04:00 04:00-06:00 06:00-08:00 08:00-12:00 12:00-06:00 06:00-09:00 09:00-10:00 10:00-11:30 11:30-12:30 12:30-06:00 06:00-13:00 13:00-14:30 14:30-20:30 20:30-22:00 22:00-22:30 22:30-02:30 02:30-05:00 05:00-05:30 05:30-06:00 06:00-07:00 07:00-09:00 09:00-15:00 15:00-17:00 17:00-19:00 19:00-06:00 Duration 2-1/2 hr 5hr 9hr 17 hr lhr 1/4hr 1/4 hr 2-1/2 hr lhr lhr lhr 1/2 hr 3hr 1-1/2 hr 1/2 hr 1-1/2 hr 1/2 hr 1/2 hr 1-1/2 hr 1/2 hr 1-1/4 hr 1/4 hr 1/2 hr 12hr 14hr lhr 2hr 1-1/2 hr lhr 2-1/2 hr 2hr 2hr 4hr 18hr 3hr lhr 1-1/2 hr lhr 17-1/2 hr 7hr 1-1/2 hr 6hr 1-1/2 hr 1/2 hr 4hr 2-1/2 hr 1/2 hr 1/2 hr lhr 2hr 6hr 2hr 2hr llhr Activity Tested All functions Serviced Drillfloor / Derrick Serviced Drillstring handling equipment Serviced Drillstring handling equipment (cont...) Tested Kelly cocks Removed BOP test plug assembly Installed B ore protector Made up BHA no. 2 Singled in drill pipe to 1998.00 ft Repaired Drillstring handling equipment Repaired Kelly/top drive hose Repaired Kelly/top drive hose (cont...) Drilled installed equipment - DV collar Singled in drill pipe to 4300.00 ft Serviced Drillstring handling equipment R.I.H. to 6798.00 ft Serviced Kelly/top drive hose Drilled cement to 6856.00 ft Tested Casing - Via annulus and string Held drill (Kick (well kill)) Drilled cement to 6984.00 ft Drilled to 7016.00 ft Performed formation integrity test Drilled to 8655.00 ft Drilled to 10028.00 ft (cont...) Circulated at 10028.00 ft Pulled out of hole to 6983.00 ft Serviced Top drive Serviced Block line R.I.H. to 10028.00 ft Drilled to 10238.00 ft Drilled to 10407.00 ft Repaired Top drive Drilled to 12180.00 ft Drilled to 12368.00 ft Circulated at 12368.00 ft Pulled out of hole to 9950.00 ft R.I.H. to 12368.00 ft Drilled to 13779.00 ft Drilled to 14147.00 ft Circulated at 14147.00 ft Pulled out of hole to 0.00 ft Pulled BHA Retrieved Bore protector Tested BOP stack Repaired Top drive Installed Bore protector Serviced Block line Serviced Block line Made up BHA no. 3 R.I.H. to 14147.00 ft Circulated at 14147.00 ft Circulated at 14147.00 ft Drilled to 14954.00 ft 2 27 August 97 Facility Date/Time 19 May 97 20 May 97 21 May 97 22 May 97 23 May 97 24 May 97 25 May 97 Pt Mac 2 Progress Report Well P2-19 Rig Doyon 14 Page Date 06:00-14:00 14:00-16:30 16:30-20:00 20:00-21:30 21:30-22:00 22:00-04:00 04:00-04:30 04:30-06:00 06:00-14:00 14:00-20:00 20:00-06:00 06:00-09:00 09:00-10:00 10:00-13:00 13:00-14:00 14:00-15:00 15:00-15:30 15:30-17:15 17:15-17:30 17:30-02:30 02:30-06:00 06:00-06:30 06:30-07:30 07:30-08:45 08:45-09:30 09:30-11:00 11:00-12:00 12:00-16:30 16:30-17:30 17:30-21:00 21:00-22:00 22:00-01:30 01:30-02:30 02:30-06:00 06:00-07:00 07:00-14:30 14:30-15:00 15:00-15:45 15:45-16:00 16:00-16:30 16:30-17:45 17:45-18:15 18:15-22:00 22:00-22:30 22:30-00:30 00:30-02:00 02:00-06:00 06:00-21:00 21:00-23:30 23:30-05:00 05:00-06:00 06:00-09:00 09:00-13:00 13:00-17:00 Duration 8hr 2-1/2 hr 3-1/2 hr 1-1/2 hr 1/2 hr 6hr 1/2 hr 1-1/2 hr 8hr 6hr 10hr 3hr lhr 3hr lhr lhr 1/2 hr 1-3/4 hr 1/4hr 9hr 3-1/2 hr 1/2 hr lhr 1-1/4 hr 3/4 hr 1-1/2 hr lhr 4-1/2 hr lhr 3-1/2 hr lhr 3-1/2 hr lhr 3-1/2 hr lhr 7-1/2 hr 1/2 hr 3/4 hr 1/4 hr 1/2 hr 1-1/4 hr 1/2 hr 3-3/4 hr 1/2 hr 2hr 1-1/2 hr 4hr 15hr 2-1/2 hr 5-1/2 hr lhr 3hr 4hr 4hr Activity Drilled to 15512.00 ft Circulated at 15512.00 ft Pulled out of hole to 14289.00 ft Circulated at 14298.00 ft R.I.H. to 15144.00 ft Circulated at 15144.00 ft R.I.H. to 15500.00 ft Circulated at 15500.00 ft Pulled out of hole to 15144.00 ft Circulated at 15144.00 ft Laid down 6044.00 ft of 5in OD drill pipe Laid down 2103.00 ft of 5in OD drill pipe Serviced Block line Laid down 6797.00 ft of 5in OD drill pipe Pulled BHA Downloaded MWD tool Removed Bore protector Rigged up Casing handling equipment Held safety meeting Ran Casing to 8800.00 ft (7in OD) Circulated at 8800.00 ft Circulated at 8800.00 ft Ran Casing to 9825.00 ft (7in OD) Circulated at 9825.00 ft Ran Casing to 10850.00 ft (7in OD) Circulated at 10850.00 ft Ran Casing to 11875.00 ft (7in OD) Circulated at 11875.00 ft Ran Casing to 12875.00 ft (7in OD) Circulated at 12875.00 ft Ran Casing to 13900.00 ft (7in OD) Circulated at 13900.00 ft Ran Casing to 14728.00 ft (7in OD) Circulated at 14728.00 ft Circulated at 14718.00 ft Worked stuck pipe at 14718.00 ft Circulated at 14718.00 ft Batch mixed slurry - 96.000 bbl Held safety meeting Mixed and pumped slurry - 97.000 bbl Displaced slurry - 563.000 bbl Tested Casing Wait on cement Removed Well control Installed Emergency hang off assembly Installed BOP stack Wait on cement Conducted electric cable operations Rigged up Tubing handling equipment Ran Tubing to 4153.00 ft (4-1/2in OD) Packer worked at 4110.00 ft Rig waited · Service personnel Cut Tubing at 4105.00 ft Pulled out of hole to 0.00 ft 3 27 August 97 Facility Date/Time 26 May 97 27 May 97 28 May 97 29 May 97 30 May 97 Pt Mac 2 Progress Report Well P2-19 Rig Doyon 14 Page Date 17:00-18:30 18:30-20:30 20:30-00:00 00:00-00:30 00:30-06:00 06:00-10:00 10:00-11:30 11:30-12:30 12:30-14:00 14:00-15:30 15:30-17:00 17:00-18:00 18:00-18:30 18:30-19:00 19:00-20:00 20:00-21:30 21:30-22:30 22:30-01:00 01:00-03:30 03:30-06:00 06:00-19:00 19:00-21:00 21:00-23:00 23:00-01:00 01:00-03:00 03:00-05:00 05:00-06:00 06:00-07:00 07:00-07:30 07:30-08:30 08:30-10:00 10:00-10:30 10:30-18:30 18:30-19:00 19:00-02:30 02:30-03:30 03:30-04:00 04:00-04:30 04:30-05:30 05:30-06:00 06:00-11:00 11:00-11:45 11:45-12:30 12:30-17:00 17:00-18:00 18:00-21:30 21:30-22:00 22:00-23:00 23:00-05:00 05:00-06:00 06:00-06:15 06:15-06:30 06:30-07:30 07:30-01:30 Duration 1-1/2 hr 2hr 3-1/2 hr 1/2 hr 5-1/2 hr 4hr 1-1/2 hr lhr 1-1/2 hr 1-1/2 hr 1-1/2 hr lhr 1/2 hr 1/2 hr lhr 1-1/2 hr lhr 2-1/2 hr 2-1/2 hr 2-1/2 hr 13hr 2hr 2hr 2hr 2hr 2hr lhr lhr 1/2 hr lhr 1-1/2 hr 1/2 hr 8hr 1/2 hr 7-1/2 hr lhr 1/2hr 1/2hr lhr 1/2 hr 5hr 3/4 hr 3/4 hr 4-1/2 hr lhr 3-1/2 hr 1/2 hr lhr 6hr lhr 1/4 hr 1/4 hr lhr 18hr Activity Rigged up Handling equipment Made up BHA no. 4 Singled in drill pipe to 4108.00 ft Serviced Top drive Drilled to 4109.00 ft Drilled to 4109.50 ft Pulled out of hole to 0.00 ft Pulled BHA Serviced Block line R.I.H. to 4105.00 ft Pulled out of hole to 0.00 ft Pulled BHA Made up BHA no. 5 Pulled BHA Made up BHA no. 6 R.I.H. to 4105.00 ft Jarred stuck pipe at 4105.00 ft Pulled out of hole to 0.00 ft R.I.H. to 4110.00 ft Drilled to 4110.00 ft Drilled to 4111.00 ft Pulled out of hole to 0.00 ft R.I.H. to 4110.00 ft Pulled out of hole to 0.00 ft Made up BHA no. 8 R.I.H. to 4111.00 ft Pulled out of hole to 2300.00 ft Pulled out of hole to 390.00 ft Pulled BHA Made up BHA no. 9 R.I.H. to 4275.00 ft Circulated at 4275.00 ft Singled in drill pipe to 14623.00 ft Fished at 14623.00 ft Pulled out of hole to 46.00 ft Laid down fish Serviced Drillfloor / Derrick Tested Casing Made up BHA no. 10 R.I.H. to 1000.00 ft R.I.H. to 14675.00 ft (cont...) Circulated at 14675.00 ft Reverse circulated at 14675.00 ft Laid down 12000.00 ft of 3-1/2in OD drill pipe Serviced Block line Laid down 2000.00 ft of 3-1/2in OD drill pipe Pulled BHA Rigged up Service lines Conducted electric cable operations Rigged down Logging/braided cable equipment Held safety meeting Removed Bore protector Rigged up Tubing handling equipment Ran Tubing to 12280.00 ft (4-1/2in OD) 4 27 August 97 Facility Pt Mac 2 Progress Report Well P2-19 Rig Doyon 14 Page Date 5 27 August 97 Date/Time 31 May 97 01:30-02:30 02:30-03:00 03:00-06:00 06:00-07:00 07:00-08:00 08:00-10:30 10:30-11:00 11:00-12:00 12:00-14:30 14:30-15:30 15:30-18:00 18:00-19:00 19:00-21:00 21:00-23:00 23:00-03:00 Duration lhr 1/2 hr 3hr lhr lhr 2-1/2 hr 1/2 hr lhr 2-1/2 hr lhr 2-1/2 hr lhr 2hr 2hr 4hr Activity Installed SCSSSV control line Tested SCSSSV control line Ran Tubing to 4-1/2in (13980.00 ft OD) Ran Tubing to 14308.00 ft (4-1/2in OD) (cont...) Installed Hanger assembly Circulated at 14339.00 ft Retrieved Tubing landing string Rigged down BOP stack Installed Xmas tree Removed Hanger plug Circulated at 14339.00 ft Freeze protect well - 85.000 bbl of Diesel Functioned Packer assembly Installed Hanger plug Rig moved 100.00 % Performance Enquiry Report Operator ARCO Date 00:37, 28 Aug 97 Page 1 The analysis is from - 18:00, 13 May 97 - to - 18:00, 13 May 97 Programs in Result Table: P2-19 Well Type Time From Time To Duration Description E.M.W.(equivalent mud weight) P2-19 Event 18:00, 13 May 97 18:00, 13 May 97 0 hr 0 min Obtained leak off 14.810 Hole Size MDR 8-1/2 SE/~T, BY:~/E$$~GE CE~TF_~ ; 9-16-/)7 ; . 8:16 ; .~o r~u~* vu~ o~oza~,,, ~, ~ EL Well Work Log Date Dem~ription DS-Well 6/27/97 PERF 3 3/8" 'P2-19 FTP/ITP PS, IAPSl ' OAPSi ' IsmlPll IMInID SSSV nipple 800 psi 250 psi 200 psi 00 I 3.725' @14327' . 4 1/2' BAL-O SVLN S~SV Information Tubular Or Casing problems PBTD NO SSSV 14610' C/E #1 SINS ,C/E#2 C/E #3 C/E #4 CIE ~f5 ' · Diesel (Reaov.) Diesel (non Re~ov) AFE ~ 2B0208 CC~ PMDS009DH" I C_.lass Activity Time Log Entry 09:00 MI-TGSM-RU ! · 10:00 ~ RU FINk.qHED, OBT~NED R~IO $1~ ON VERY BUOY PAD. 11:00 PT 3500 PSI. RIH WITH CCL/20' GUN. 3.375' OD. 25' 14:45 SHOT 14540-60 AT 0 PSi. WHP JUMPED TO 1100 PSI. TOOH · 1 O: 1 ~ AT SURFACE. ALL CHARGES FIRED. 16:40 RIH wri-H CCL/30' GUN. 3.375' OD, 33' , , 1 9:10 SHOT 14470-500' BALANCED. NO CHANGE IN PRESSURE. TOOH , , · 20'25 AT SURFACE. ALL CHARGES FIRED. 21:00 Rill WITH CCL/30' GUN' 3;375' OD, 3'3; ' , , 22:35 SHOT 14416. -46' 200 ,PSI UNDERBA .LANCED. (900 PSI WHP1. TOO. H ,, . 00:10 AT SURFACE. ASF · , , p0:45 RI3V~ , , , , , · , · . . · . , · SUCCESSFULLY PERFOFIATE. D NEWWELL 1100 PSI WHP , 14540 145'60 00:06 2015 ' ' 6 0 ' U P'i ADD ..:i:;:' ;::~:" ' · '"'" '"..... i'i';:':~.'r~ti.i~'~l::i.'n, te~'a'l~:(BH~i,'.S,,:Cleptlt.~)', .&..-.Gu'~i,.IY~ 0,'.'(In~.~e'i~'rii0re...JIr~e$::~a ne.G.e:i~ry):.....'"' '"";..... ...... . .......... Top (ft) Bottom" '~=q= Gra~S/EHD/-I-rP Phasing Orient OtB/U Zone Ad/Reperf 14416 14446 6 20.5 60 U Pl ADD 1 4470 14500 6 20.5 60 B P1 ADD ..? I,: ' ..::.. .:.:. "-" 'i:' BOPD:. F/ITP: MD:. Note ,fluid pumped and bbls behi.nd TOt. Gas: GOR;. ~: pipe in "log enh~' section .next to each BWPD:- 'WC (%):, press; pass made GL Gas: Choke o:1 Temp.. , "ned ' I~ageNo. of Slg ..R;zrJ~v-/"~aZ~/~ (./"or ~.n~.Ui :;a~/'~--t~) , 1 ARCO ALASKA INC. DRILLSITE P2, WELL NO. P2-19 POINT MCINTYRE, ALASKA Gyro Multishot Survey Inside 7" CASING Survey date: 24- MAY, 1997 Job number :A0597GCE402 CONTENTS JOB NUMBER :A0597GCE402 '1. DISCUSSION , SURVEY CERTIFICATION SHEET 2. SURVEY DETAILS 3. OUTRUN SURVEY LISTING 4. QUALITY CONTROL 5. EQUIPMENT AND CHRONOLOGICAL REPORT 1. DISCUSSION , SURVEY CERTIFICATION SHEET DISCUSSION JOB NUMBER- A0597GCE402 Tool 768 was run in WELL# PM2-19 on ATLAS 15/32" wireline inside CASING. The survey was run without problems. SURVEY CERTIFICATION SHEET JOB NUMBER' A0597GCE402 The data for this survey and the calculations for this survey were obtained and performed by me according to standards and procedures as set forth by Gyrodata Limited, true and correct to the best of my knowledge. TOM STODDARD OPERATIONS ENGINEER The data and calculations for this survey have been checked by me and conform to the standards and procedures as set forth by Gyrodata Limited. This report represents a directional survey of this well based on the original data obtained at the wellsite. Checked by :- ROB SHOUP OPERATIONS MANAGER 2. SURVEY DETAILS SURVEY DETAILS JOB NUMBER: A0597GCE402 CLIENT: ARCO ALASKA INC./SHARED SERVICES RIG: DOYON 14 LOCATION: DRILLSITE PM2 WELL: PM2-19 LATITUDE: 70.45 N LONGITUDE: 148.6 W SURVEY DATE: SURVEY TYPE: 24, MAY 1997 GYRO MULTISHOT IN 7" CASING DEPTH REFERENCE: ROTARY TABLE ELEVATION 46.0' SUBSEA=46.0 MAX. SURVEY DEPTH: 14600' SURVEY TIED ONTO: NA SURVEY INTERVAL: 0-14600' APl NUMBER: 050-029-22765 TARGET DIRECTION: 38.87 GRID CORRECTION: N/A CALCULATION METHOD: MINIMUM CURVATURE SURVEYOR: TOM STODDARD 3. OUTRUN SURVEY LISTING A Gyroda t a D i re c t i onal Survey for ARCO ALASKA INC. DRILLSITE PM2, WELL NO. P2-19 POINT MCINTYRE, ALASKA Job Number: A0597GCE402 Run Date: 27-May-97 14:00:00 Surveyor: TOM STODDARD Calculation Method: MINIMUM CURVATURE Survey Latitude: 70.450000 deg. N Sub-sea Correction from Vertical Reference: 46 ft. Azimuth Correction: Gyro: Bearings are Relative to True North Proposed Well Direction: 36.870 deg Vertical Section Calculated from Well Head Location Closure Calculated from Well Head Location Horizontal Coordinates Calculated from Local Horizontal Reference A Gyroda t a D i re c t i ona i Survey ARCO ALASKA INC. DRILLSITE PM2, WELL NO. POINT MCINTYRE, ALASKA Job Number: A0597GCE402 P2-19 Page MEASURED I N C L AZIMUTH VERTICAL DEPTH DEPTH feet deg. deg. feet VERTICAL SECTION feet DOGLEG CLOSURE SEVERITY DIST. AZIMUTH deg./ feet deg. 100 ft. HORIZONTAL COORDINATES feet 0.0 0.00 0.00 0.0 100.0 .33 33.68 100.0 200.0 .60 87.43 200.0 300.0 .51 66.94 300.0 400.0 .80 61.78 400.0 0.0 .3 .9 1.6 2.6 .00 0.0 0.0 .33 .3 33.7 .49 1.0 59.5 .22 1.9 68.7 .29 3.0 66.8 0.00 N 0.00 E .24 N .16 E .50 N .84 E .70 N 1.78 E 1.20 N 2.80 E 500.0 1.07 66.05 500.0 600.0 1.94 56.88 599.9 700.0 2.27 47.42 699.9 800.0 2.84 45.34 799.8 900.0 3.53 43.78 899.6 4.1 6.5 10.0 14.4 19.9 .28 4.7 65.9 .90 7.3 63.8 .48 10.9 59.8 .57 15.3 55.9 .69 20.8 52.9 1.91 N 4.27 E 3.22 N 6.55 E 5.49 N 9.43 E 8.57 N 12.65 E 12.53 N 16.54 E 1000.0 3.97 46.68 999.4 1100.0 5.33 50.46 1099.1 1200.0 6.53 56.60 1198.5 1300.0 8.21 58.63 1297.7 1400.0 9.82 58.87 1396.5 26.4 34.3 44.2 56.2 70.7 .48 27.2 51.1 1.40 35.3 50.5 1.35 45.7 51.3 1.70 58.4 52.7 1.62 74.0 54.0 17.13 N 21.19 E 22.46 N 27.29 E 28.55 N 35.62 E 35.40 N 46.47 E 43.52 N 59.87 E 1500.0 12.55 59.40 1494.6 1603.0 14.44 56.47 1594.7 1700.0 16.93 54.21 1688.1 1750.0 18.64 53.59 1735.7 1800.0 20.48 52.16 1782.8 88.7 111.1 136.0 150'.6 166.7 2.72 93.4 55.1 1.96 117.4 55.6 2.64 143.6 55.6 3.45 158.8 55.4 3.79 175.6 55.2 53.47 N 76.52 E 66.26 N 96.86 E 81.21 N 118.41 E 90.21 N 130.75 E 100.32 N 144.09 E 1850.0 23.75 50.41 1829.1 1900.0 27.48 48.73 1874.2 1950.0 29.95 47.71 1918.1 2000.0 31.54 48.70 1961.0 2050.0 32.32 48.91 2003.5 184.9 206.0 229.6 254.6 280.5 6.68 194.3 54.8 7.59 215.9 54.2 5.04 239.8 53.6 3.33 265.2 53.1 1.58 291.6 52.7 112.10 N 158.76 E 126.13 N 175.19 E 142.14 N 193.10 E 159.17 N 212.16 E 176.59 N 232.06 E A Gyroda t a D i re c t i ona i Survey %RCO ALASKA INC. DRILLSITE PM2, WELL NO. POINT MCINTYRE, ALASKA Iob Number: A0597GCE402 P2 -19 Page ~EASURED I N C L AZIMUTH VERTICAL DEPTH DEPTH feet deg. deg. feet VERTICAL SECTION feet DOGLEG CLOSURE SEVERITY DIST. AZIMUTH deg. / feet deg. 100 ft. HORIZONTAL COORDINATES feet 2100.0 33.62 48.48 2045.4 2150.0 34.36 48.47 2086.9 2200.0 35.32 47.69 2127.9 2250.0 35.92 47.02 2168.5 2300.0 36.60 45.42 2208.9 307.1 334.5 362.5 391.2 420.3 2.64 318.7 52.4 1.49 346.6 52.1 2.11 375.1 51.8 1.44 404.2 51.4 2.34 433.6 51.1 194.55 N 252.49 E 213.08 N 273.42 E 232.17 N 294.67 E 251.89 N 316.08 E 272.36 N 337.43 E 2350.0 36.80 45.56 2249.0 2400.0 37.01 45.95 2288.9 2450.0 37.64 46.02 2328.7 2500.0 38.35 46.01 2368.1 2550.0 39.39 44.91 2407.0 449.9 479.6 509.5 539.9 570.9 .42 463.4 50.7 .63 493.3 50.4 .27 523.5 50.2 · 42 554.2 49.9 .49 585.5 49.7 293.30 N 358.74 E 314.25 N 380.25 E 335.32 N 402.05 E 356.69 N 424.20 E 378.70 N 446.56 E 2600.0 40.75 43.57 2445.3 2650.0 41.72 42.68 2482.9 2700~0 42.73 42.27 2519.9 2750.0 44.10 43.64 2556.2 · 2800.0 45.00 45.11 2591.9 602.8 635.6 669.0 703.2 738.0 .22 617.6 49.4 .28 650.3 49.1 .09 683.7 48.8 .32 717.9 48.5 .74 752.9 48.3 401.76 N 469.01 E 425.82 N 491.54 E 450.60 N 514.23 E 475.75 N 537.65 E 500.82 N 562.18 E 2850.0 46.61 45.94 2626.7 2900.0 48.13 46.22 2660.6 2950.0 49.10 45.76 2693.6 3000 . 0 49 . 34 45 . 73 2726 . 3 3050.0 49.42 45.17 2758.8 773.4 809.7 846.8 884.2 921.7 .42 788.7 48.2 .07 825.5 48.1 .07 863.0 48.0 .47 900.8 47.9 .87 938.7 47.8 525.93 N 587.77 E 551.44 N 614.26 E 577.51 N 641.24 E 603.93 N 668.36 E 630.55 N 695.41 E 3100.0 49.95 44.86 2791.2 3150.0 51.34 44.70 2822.9 3200.0 52.42 44.53 2853.8 3250.0 53.70 43.81 2883.8 3300.0 54.27 43.55 2913.2 959.4 997.7 1036.7 1076.3 1116.5 1.15 976.8 47.7 2.79 1015.4 47.6 2.19 1054.7 47.5 2.81 1094.6 47.3 1.21 1135.0 47.2 657.50 N 722.37 E 684.95 N 749.60 E 712.95 N 777.23 E 741.61 N 805.07 E 770.86 N 833.00 E A Gyroda t a D i re c t i ona i Survey %RCO ALASKA INC. DRILLSITE PM2, WELL NO. ?OINT MCINTYRE, ALASKA Iob Number: A0597GCE402 P2-19 Page ~EASURED I N C L AZIMUTH VERTICAL DEPTH DEPTH feet deg. deg. feet VERTICAL DOGLEG CLOSURE SECTION SEVERITY DIST. AZIMUTH feet deg./ feet deg. 100 ft. HORIZONTAL COORDINATES feet 3350.0 54.98 43.66 2942.2 3400.0 55.34 44.33 2970.7 3450.0 55.80 44.69 2999.0 3500.0 56.62 44.62 3026.8 3550.0 57.52 44.81 3054.0 1157.0 1.44 1175.6 47.1 1197.7 1.31 1216.6 47.0 1238.6 1.10 1257.8 46.9 1279.7 1.65 1299.3 46.8 1321.3 1.83 1341.3 46.8 800.38 N 861.12 E 829.90 N 889.63 E 859.31 N 918.54 E 888.87 N 947.74 E 918.70 N 977.27 E 3600.0 58.17 45.20 3080.6 3650.0 58.77 45.77 3106.7 3700.0 58.45 46.45 3132.8 3750.0 58.79 46.89 3158.8 3800.0 58.97 46.97 3184.7 1363.2 1.45 1383.6 46.7 1405.4 1.54 1426.2 46.7 1447.5 1.32 1468.9 46.7 1489 . 5 1.00 1511 . 6 46 . 7 1531.7 .39 1554.4 46.7 948.62 N 1007.20 E 978.50 N 1037.60 E 1008.09 N 1068.36 E 1037.38 N 1099.41 E 1066.61 N 1130.67 E 3850.0 59.52 47.70 3210.2 3900.0 59.69 48.48 3235.5 3950.0 59.45 48.65 3260.9 4000.0 58.09 47.56 3286.8 4050.0 57.07 47.24 3313.6 1573.9 1.66 1597.3 46.7 1616.2 1.38 1640.5 46.7 1658.5 .56 1683.5 46.8 1700.4 3.30 1726.3 46.8 1741.9 2.09 1768.5 46.8 1095.72 N 1124.53 N 1153.06 N 1181.61 N 1210.18 N 1162.27 E 1194.37 E 1226.69 E 1258.51 E 1289.58 E 4100.0 54.95 45.76 3341.5 4150.0 54.09 44.85 3370.6 4200.0 53.61 43.88 3400.1 4250.0 53.49 43.67 3429.8 4300.0 51.99 43.90 3460.0 1782.8 4.90 1809.9 46.8 1823.0 2.28 1850.6 46.8 1863.1 1.83 1891.0 46.7 1903.0 .42 1931.1 46.7 1942.5 3.03 1970.9 46.6 1238.71 N 1267.34 N 1296.20 N 1325.25 N 1353.98 N 1319.65 E 1348.59 E 1376.83 E 1404.65 E 1432.19 E 4350.0 51.02 44.15 3491.2 4400.0 50.77 44.76 3522.7 4450.0 50.92 44.88 3554.3 4500.0 52.32 44.42 3585.3 4550.0 53.39 43.41 3615.5 1981.3 1.98 2010.0 46.6 2019.8 1.08 2048.8 46.5 2058.2 .34 2087.5 46.5 2097.0 2.90 2126.7 46.5 2136.6 2.67 2166.5 46.4 1382.12 N 1409.82 N 1437.32 N 1465.20 N 1493.91 N 1459.38 E 1486.55 E 1513.88 E 1541.43 E 1569.07 E A Gyroda t a D i re c t i ona i Survey LRCO ALASKA INC. )RILLSITE PM2, WELL NO. ?OINT MCINTYRE, ALASKA Iob Number: A0597GCE402 P2-19 Page 4EASURED DEPTH feet I N C L AZIMUTH VERTICAL DEPTH deg. deg. feet VERTICAL DOGLEG CLOSURE SECTION SEVERITY DIST. AZIMUTH feet deg./ feet deg. 100 ft. H O R I Z O N T A L COORDINATES feet 4600 4650 4700 4750 4800 .0 53.72 43.03 3645.2 .0 54.19 42.78 3674.6 .0 54.55 42.51 3703.7 .0 55.25 41.91 3732.5 .0 55.69 42.01 3760.8 2176.5 .91 2206.7 46.3 2216.8 1.02 2247.0 46.3 2257.2 .84 2287.6 46.2 2297.9 1.71 2328.4 46.2 2338.9 .89 2369.5 46.1 1523.23 N 1552.84 N 1582.73 N 1613.03 N 1643.66 N 1596.61 E 1624.13 E 1651.66 E 1679.15 E 1706.69 E 4850 4900 4950 5000 5050 .0 55.85 43.26 3789.0 .0 56.02 43.58 3817.0 .0 56.27 44.15 3844.8 .0 56.50 45.18 3872.5 .0 57.64 46.01 3899.7 2380.1 2.08 2410.7 46.0 2421.2 .63 2452.1 46.0 2462.4 1.07 2493.6 45.9 2503.7 1.77 2535.2 45.9 2545.2 2.68 2577.2 45.9 1674.08 N 1704.16 N 1734.10 N 1763.71 N 1793.08 N 1734.69 E 1763.16 E 1791.94 E 1821.21 E 1851.19 E 5100 5150 5200 5250 5300 .0 58.34 45.96 3926.2 .0 58.45 45.14 3952.4 .0 58.47 45.05 3978.5 .0 58.21 44.92 4004.8 .0 58.34 44.98 4031.1 2587.0 1.39 2619.6 45.9 2629.1 1.40 2662.2 45.9 2671.3 .17 2704.8 45.9 2713.4 .55 2747.3 45.9 2755.5 .28 2789.9 45.9 1822.54 N 1852.36 N 1882.44 N 1912.54 N 1942.64 N 1881.67 E 1912.07 E 1942.25 E 1972.34 E 2002.39 E 5350 5400 5450 5500 5550 .0 58.28 44.97 4057.3 .0 58.22 44.97 4083.7 .0 57.97 44.79 4110.1 .0 57.65 44.59 4136.7 .0 57.54 44.59 4163.5 2797.7 .13 2832.4 45.9 2839.8 .12 2874.9 45.8 2881.8 .58 2917.4 45.8 2923.7 .71 2959.7 45.8 2965.5 .23 3001.9 45.8 1972.73 N 2002.81 N 2032.89 N 2062.97 N 2093.03 N 2032.46 E 2062.51 E 2092.46 E 2122.22 E 2151.85 E 5600.0 57.34 44.66 4190.4 5650.0 57.29 44.80 4217.4 5700.0 57.06 44.76 4244.5 5750.0 56.78 44.70 4271.8 5800.0 56.26 44.74 4299.4 3007.3 .42 3044.0 45.8 3049.0 .26 3086.1 45.8 3090.6 .46 3128.1 45.8 3132.1 .57 3170.0 45.7 3173.4 1.05 3211.7 45.7 2123.02 N 2152.92 N 2182.74 N 2212.51 N 2242.14 N 2181.46 E 2211.07 E 2240.67 E 2270.15 E 2299.50 E A Gyroda t a D i r e c t iona i Survey .~RCO ALASKA INC. DRILLSITE PM2, WELL NO. POINT MCINTYRE, ALASKA 3ob Number: A0597GCE402 P2 -19 Page MEASURED DEPTH feet I N C L AZIMUTH VERTICAL DEPTH deg. deg. feet VERTICAL DOGLEG CLOSURE SECTION SEVERITY DIST. AZIMUTH feet deg./ feet deg. 100 ft. HORIZONTAL COORDINATES feet 5850.0 5900.0 5950.0 6000.0 6050.0 55.94 44.60 4327.3 54.64 44.23 4355.8 54.11 43.16 4384.9 54.47 42.01 4414.1 54.88 41.32 4443.0 3214.5 .69 3253.2 45.7 3255.3 2.67 3294.3 45.7 3295.6 2.04 3334.9 45.7 3336.0 1.99 3375.4 45.6 3376.7 1.39 3416.1 45.6 2271.65 N 2328.67 E 2301.00 N 2357.44 E 2330.39 N 2385.52 E 2360.28 N 2412.99 E 2390.75 N 2440.11 E 6100.0 6150.0 6200.0 6250.0 6300.0 55.53 40.23 4471.5 55.86 39.46 4499.7 55.61 38.88 4527.9 56.17 38.50 4555.9 56.71 38.32 4583.5 3417.6 2.22 3457.0 45.5 3458.9 1.43 3498.1 45.5 3500.2 1.09 3539.2 45.4 3541.5 1.29 3580.3 45.3 3583.2 1.12 3621.7 45.2 2421.85 N 2453.56 N 2485.60 N 2517.91 N 2550.55 N 2466.92 E 2493.39 E 2519.48 E 2545.36 E 2571.24 E 6350.0 6400.0 6450.0 6500.0 6550.0 57.42 37.42 4610.7 57.71 36.93 4637.5 57.32 36.29 4664.4 57.08 36.00 4691.5 56.46 34.17 4718.9 3625.1 2.08 3663.3 45.1 3667.3 1.00 3705.1 45.1 3709.5 1.34 3746.8 45.0 3751.5 .67 3788.4 44.9 3793.3 3.31 3829.6 44.8 2583.68 N 2617.31 N 2651.16 N 2685.10 N 2719.32 N 2597.00 E 2622.50 E 2647.65 E 2672.44 E 2696.48 E 6600.0 6650.0 6700.0 6750.0 6800.0 56.07 32.85 4746.7 56.18 31.22 4774.5 56.69 31.07 4802.2 57.39 31.02 4829.4 57.27 30.97 4856.4 3834.9 2.33 3870.4 44.6 3876.2 2.71 3910.9 44.5 3917.7 1.04 3951.4 44.4 3959.4 1.40 3992.3 44.2 4001.3 .24 4033.3 44.1 2753.99 N 2789.18 N 2824.83 N 2860.78 N 2896.86 N 2719.44 E 2741.46 E 2763.01 E 2784.64 E 2806.32 E 6850.0 6900.0 6950.0 7000.0 7050.0 56.96 30.93 4883.5 56.62 30.85 4910.9 56.42 30.70 4938.5 56.35 30.82 4966.2 56 . 13 30 . 54 4993 . 9 4043.0 .62 4074.2 44.0 4084.6 .71 4114.9 43.8 4126.1 .47 4155.6 43.7 4167.5 .25 4196.2 43.6 4208.8 .65 4236.7 43.4 2932.87 N 2968.77 N 3004.60 N 3040.38 N 3076.13 N 2827.91 E 2849.39 E 2870.73 E 2892.02 E 2913.23 E A Gyrodat a D i re c t i ona I Survey LRCO ALASKA INC. )RILLSITE PM2, WELL NO. ?OINT MCINTYRE, ALASKA Iob Number: A0597GCE402 P2-19 Page 4EASURED I N C L AZIMUTH VERTICAL DEPTH DEPTH feet deg. deg. feet VERTICAL DOGLEG CLOSURE SECTION SEVERITY DIST. AZIMUTH feet deg./ feet deg. 100 ft. HORIZONTAL COORDINATES feet 7100.0 55.82 31.22 5021.9 7150.0 55.81 31.58 5050.0 7200.0 55.97 33.05 5078.1 7250.0 56.05 33.59 5106.0 7300.0 56.01 33.47 5133.9 4250.1 1.28 4277.1 43.3 4291.2 .60 4317.6 43.2 4332.5 2.46 4358.3 43.1 4373.9 .90 4399.1 43.0 4415.3 .20 4440.0 42.9 3111.69 N 3147.00 N 3181.98 N 3216.62 N 3251.19 N 2934.50 E 2956.05 E 2978.18 E 3000.95 E 3023.86 E 7350.0 56.01 33.20 5161.9 7400.0 56.92 33.55 5189.5 7450.0 57.27 33.74 5216.7 7500.0 57.84 33.80 5243.5 7550.0 57.95 33.63 5270.1 4456.6 .46 4480.9 42.8 4498.2 1.91 4522.0 42.8 4540.2 .78 4563.5 42.7 4582.3 1.15 4605.2 42.6 4624.6 .36 4647.0 42.5 3285.82 N 3320.62 N 3355.57 N 3390.65 N 3425.88 N 3046.64 E 3069.57 E 3092.82 E 3116.28 E 3139.79 E 7600.0 58.08 33.72 5296.6 7650.0 58.03 33.66 5323.0 7700.0 58.77 33.26 5349.2 7750.0 58.89 32.96 5375.1 7800.0 58.19 33.09 5401.2 4666.9 .30 4688.9 42.4 4709.3 .15 4730.9 42.3 4751.8 1.63 4773.0 42.3 4794.5 .56 4815.2 42.2 4837.0 1.42 4857.3 42.1 3461.17 N 3496.47 N 3532.00 N 3567.84 N 3603.59 N 3163.31 E 3186.84 E 3210.32 E 3233.69 E 3256.94 E 7850.0 58.54 32.79 5427.4 7900.0 59.05 32.59 5453.3 7950.0 58.95 32.78 5479.1 8000.0 58.99 32.83 5504.9 8050.0 58.97 33.14 5530.6 4879.5 .87 4899.4 42.0 4922.2 1.07 4941.6 41.9 4964.9 .38 4983.9 41.9 5007.6 .13 5026.2 41.8 5050.4 .53 5068.5 41.7 3639.32 N 3675.31 N 3711.38 N 3747.39 N 3783.34 N 3280.09 E 3303.19 E 3326.33 E 3349.54 E 3372.88 E 8100.0 58.70 33.04 5556.5 8150.0 58.53 32.99 5582.5 8200.0 58.15 32.86 5608.8 8250.0 58.01 32.99 5635.2 8300.0 57.99 33.07 5661.7 5093.1 .58 5110.8 41.6 5135.7 .35 5153.0 41.6 5178.1 .78 5195.1 41.5 5220.5 .36 5237.1 41.4 5262.8 .14 5279.0 41.4 3819.18 N 3854.97 N 3890.69 N 3926.32 N 3961.87 N 3396.23 E 3419.49 E 3442.62 E 3465.69 E 3488.81 E A Gyr oda t a D i re c t i ona i Survey ~CO ALASKA INC. )RILLSITE PM2, WELL NO. ~OINT MCINTYRE, ALASKA rob Number: A0597GCE402 P2 -19 Page [EASURED DEPTH feet I N C L AZIMUTH VERTICAL DEPTH deg. deg. feet VERTICAL DOGLEG CLOSURE SECTION SEVERITY DIST. AZIMUTH feet deg./ feet deg. 100 ft. HORIZONTAL COORDINATES feet 8350 8400 8450 8500 8550 .0 .0 .0 .0 .0 58.38 32.90 5688.1 58.29 32.98 5714.3 58.12 32.73 5740.7 57.98 32.75 5767.1 58.09 32.60 5793.6 5305.2 .84 5321.1 41.3 5347.6 .23 5363.2 41.2 5390.0 .53 5405.2 41.2 5432.3 .28 5447.2 41.1 5474.6 .33 5489.2 41.0 3997.51 N 3511.93 E 4033.22 N 3535.07 E 4068.92 N 3558.13 E 4104.61 N 3581.07 E 4140.32 N 3603.98 E 8600 8650 8700 8750 8800 .0 .0 .0 .0 .0 58.37 32.59 5819.9 58.02 33.32 5846.3. 57.93 33.34 5872.8 57.86 33.12 5899.3 57.30 34.64 5926.1 5517.0 .55 5531.2 41.0 5559.4 1.43 5573.3 40.9 5601.7 .19 5615.3 40.9 5644.0 .40 5657.3 40.8 5686.2 2.79 5699.2 40.7 4176.13 N 4211.79 N 4247.21 N 4282.63 N 4317.67 N 3626.87 E 3649.99 E 3673.28 E 3696.49 E 3720.02 E 885O 8900 8950 9000 9050 .0 .0 .0 .0 .0 56.95 35.54 5953.3 57.18 36.32 5980.5 57.60 37.49 6007.4 57.73 38.11 6034.2 58.29 38.17 6060.6 5728.1 1.68 5741.0 40.7 5770.1 1.39 5782.8 40.7 5812.2 2.13 5824.8 40.6 5854.4 1.09 5867.0 40.6 5896.8 1.11 5909.4 40.6 4352.04 N 4386.01 N 4419.69 N 4453.07 N 4486.43 N 3744.16 E 3768.78 E 3794.08 E 3819.97 E 3846.16 E 9100 9150 9200 9250 9300 .0 .0 .0 .0 .0 58.19 37.61 6087.0 58.22 37.29 6113.3 57.42 36.80 6139.9 59.03 37.26 6166.3 58.25 36.89 6192.3 5939.3 .97 5951.9 40.6 5981.8 .55 5994.3 40.6 6024.2 1.80 6036.5 40.5 6066.7 3.31 6079.0 40.5 6109.4 1.69 6121.6 40.5 4519.97 N 4553.71 N 4587.49 N 4621.42 N 4655.48 N 3872.27 E 3898.12 E 3923.61 E 3949.21 E 3974.95 E 9350.0 9400.0 9450.0 9500.0 9550.0 58.74 36.55 6218.4 57.45 35.59 6244.8 57.84 35.32 6271.6 57.75 34.92 6298.2 57.81 34.51 6324.9 6152.0 1.15 6164.1 40.5 6194.4 3.07 6206.4 40.4 6236.7 .90 6248.5 40.4 6278.9 .71 6290.6 40.4 6321.2 .70 6332.7 40.3 4689.65 N 4723.96 N 4758.36 N .4792.97 N 4827.74 N 4000.44 E 4025.43 E 4049.93 E 4074.27 E 4098.36 E A Gyroda t a D i re c t i ona i Survey LRCO ALASKA INC. ]RILLSITE PM2, WELL NO. ?OINT MCINTYRE, ALASKA Iob Number: A0597GCE402 P2-19 Page 4EASURED I N C L AZIMUTH VERTICAL DEPTH DEPTH feet deg. deg. feet VERTICAL DOGLEG CLOSURE SECTION SEVERITY DIST. AZIMUTH feet deg./ feet deg. 100 ft. HORIZONTAL COORDINATES feet 9600.0 58.22 34.29 6351.4 9650.0 58.80 33.73 6377.5 9700.0 59.40 33.55 6403.2 9750.0 59.51 34.13 6428.6 9800.0 59.49 34.45 6454.0 6363.6 .90 6374.9 40.3 6406.2 1.50 6417.3 40.2 6449.0 1.24 6459.9 40.2 6492.0 1.02 6502.7 40.2 6535.0 .56 6545.6 40.1 4862.73 N 4898.07 N 4933.79 N 4969.56 N 5005.15 N 4122.32 E 4146.17 E 4169.93 E 4193.91 E 4218.19 E 9850.0 58.34 34.42 6479.8 9900.0 57.97 34.01 6506.2 9950.0 56.65 32.50 6533.2 10000.0 56.76 32.37 6560.6 10050.0 56.77 32.24 6588.0 6577.8 2.31 6588.2 40.1 6620.2 1.02 6630.4 40.0 6662.2 3.66 6672.2 40.0 6703.9 .32 6713.7 40.0 6745.6 .21 6755.1 39.9 5040.47 N 5075.59 N 5110.78 N 5146.05 N 5181.40 N 4242.40 E 4266.28 E 4289.36 E 4311.77 E 4334.12 E 10100.0 56.82 32.07 6615.4 10150.0 57.07 31.99 6642.7 10200.0 57.58 31.81 6669.7 10250.0 58.20 31.76 6696.3 10300.0 57.93 31.98 6722.7 6787.3 .30 6796.6 39.9 6829.0 .51 6838.1 39.8 6871.0 1.08 6879.8 39.8 6913.2 1.25 6921.7 39.7 6955.4 .66 6963.8 39.7 5216.82 N 5252.34 N 5288.07 N 5324.07 N 5360.11 N 4356.39 E 4378.62 E 4400.86 E 4423.16 E 4445.57 E 10350.0 57.79 32.06 6749.3 10400.0 58.03 31.80 6775.9 10450.0 58.48 31.56 6802.2 10500.0 58.20 32.46 6828.4 10550.0 58.05 32.40 6854.8 6997.6 .31 7005.7 39.6 7039.8 .65 7047.7 39.6 7082.2 .99 7089.8 39.5 7124.6 1.63 7132.0 39.5 7166.9 .31 7174.2 39.4 5396.01 N 5431.96 N 5468.15 N 5504.23 N 5540.07 N 4468.02 E 4490.42 E 4512.75 E 4535.31 E 4558.08 E 10600.0 56.92 33.72 6881.7 10650.0 56.83 33.73 6909.0 10700.0 56.75 33.72 6936.4 10750.0 56.81 33.60 6963.8 10800.0 56.88 33.52 6991.1 7209.0 3.17 7216.1 39.4 7250.8 .18 7257.7 39.4 7292.6 .17 7299.4 39.3 7334.3 .23 7341.0 39.3 7376.1 .20 7382.6 39.3 5575.41 N 5610.24 N 5645.03 N 5679.85 N 5714.73 N 4581.08 E 4604.33 E 4627.55 E 4650.74 E 4673.88 E A Gyr oda t a D i r e c t iona i Survey LRCO ALASKA INC. )RILLSITE PM2, WELL NO. ?OINT MCINTYRE, ALASKA Iob Number: A0597GCE402 P2 -19 Page 4EASURED DEPTH feet I N C L AZIMUTH VERTICAL DEPTH deg. deg. feet VERTICAL DOGLEG CLOSURE SECTION SEVERITY DIST. AZIMUTH feet deg./ feet deg. 100 ft. HORIZONTAL COORDINATES feet 10850 [0900 ~0950 11000 11050 .0 57.02 33.65 7018.4 .0 56.88 33.46 7045.7 .0 57.03 33.44 7072.9 .0 57.26 33.40 7100.0 .0 57.18 32.95 7127.1 7418.0 .35 7424.3 39.2 7459.8 .43 7466.0 39.2 7501.6 .29 7507.7 39.2 7543.6 .48 7549.5 39.2 7585.5 .77 7591.3 39.1 5749.65 N 5784.57 N 5819.54 N 5854.60 N 5889.79 N 4697.06 E 4720.23 E 4743.33 E 4766.46 E 4789.47 E 11100 11150 11200 11250 11300 .0 57.56 32.54 7154.1 .0 56.79 32.58 7181.2 .0 55.65 32.57 7209.0 .0 55.51 32.54 7237.2 .0 55.13 32.45 7265.7 7627.5 1.02 7633.2 39.1 7669.4 1.54 7674.9 39.0 7710.8 2.27 7716.2 39.0 7752.0 .30 7757.2 39.0 7793.0 .76 7798.1 38.9 5925.20 N 5960.61 N 5995.63 N 6030.40 N 6065.08 N 4812.25 E 4834.86 E 4857.23 E 4879.42 E 4901.51 E 11350 11400 11450 11500 11550 .0 .0 .0 .0 .0 55.04 32.26 7294.3 55.00 32.13 7323.0 56.17 32.51 7351.2 56.26 32.61 7379.0 56.17 32.47 7406.8 7833.8 .35 7838.8 38.9 7874.7 .23 7879.5 38.9 ,., 7915.8 2.41 7920.5 38.8 7957.2 .26 7961.8 38.8 7998.7 .31 8003.1 38.8 6099.72 N 6134.38 N 6169.24 N 6204.26 N 6239.29 N 4923.46 E 4945.29 E 4967.34 E 4989.71 E 5012.06 E 11600 11650 11700 11750 11800 .0 .0 .0 .0 .0 56.22 32.80 7434.7 56.67 33.47 7462.3 56.59 33.32 7489.8 56.27 33.23 7517.4 56.63 33.62 7545.1 8040.1 .56 8044.4 38.7 8081.7 1.44 8085.9 38.7 8123.4 .30 8127.5 38.7 8164.9 .65 8168.9 38.7 8206.5 .96 8210.4 38.6 6274.28 N 6309.17 N 6344.03 N 6378.86 N 6413.64 N 5034.47 E 5057.25 E 5080.23 E 5103.09 E 5126.05 E 11850.0 11900.0 11950.0 12000.0 12050.0 57.48 34.26 7572.3 57.19 34.03 7599.3 57.08 33.88 7626.4 57.98 34.05 7653.2 58.46 34.19 7679.6 8248.4 2.01 8252.2 38.6 8290.5 .68 8294.2 38.6 8332.4 .34 8336.1 38.6 8374.6 1.83 8378.1 38.5 8417.0 .99 8420.5 38.5 6448.45 N 6483.28 N 6518.12 N 6553.10 N 6588.29 N 5149.47 E 5173.10 E 5196.56 E 5220.13 E 5243.97 E A Gyroda t a D i re c t iona i Survey .~RCO ALASKA INC. DRILLSITE PM2, WELL NO. POINT MCINTYRE, ALASKA Job Number: A0597GCE402 P2-19 Page 10 ~EASURED DEPTH feet 12100.0 12150.0 12200.0 12250.0 12300.0 I N C L AZIMUTH VERTICAL DEPTH deg. deg. feet 58.49 34.10 7705.7 58.55 33.99 7731.8 58.48 34.11 7757.9 58.16 34.24 7784.2 57.85 33.95 7810.7 VERTICAL DOGLEG CLOSURE SECTION SEVERITY DIST. AZIMUTH feet deg./ feet deg. 100 ft. 845~.6 .18 8463.0 38.5 8502.2 .22 8505.5 38.5 8544.8 .25 8548.0 38.5 8587.3 .68 8590.5 38.4 8629.6 .79 8632.7 38.4 HORIZONTAL COORDINATES feet 6623.57 N 5267.89 E 6658.90 N 5291.76 E 6694.23 N 5315.64 E 6729.44 N 5339.54 E 6764.56 N 5363.31 E 12350.0 12400.0 12450.0 12500.0 12550.0 57.86 33.65 7837.3 57.56 33.47 7864.0 57.27 33.36 7890.9 56.88 33.18 7918.1 56.64 33.14 7945.5 8671.9 .50 8674.9 38.4 8714.1 .69 8717.1 38.4 8756.2 .60 8759.0 38.3 8798.0 .85 8800.8 38.3 8839.8 .47 8842.5 38.3 6799.74 N 6834.96 N 6870.13 N 6905.22 N 6940.22 N 5386.86 E 5410.22 E 5433.43 E 5456.45 E 5479.32 E 12600.0 12650.0 12700.0 12750.0 12800.0 56.42 32.98 7973.1 56.02 32.73 8000.9 55.88 32.49 8028.9 56.84 33.27 8056.6 57.02 33.59 8083.8 8881.4 .52 8884.0 38.3 8922.8 .91 8925.4 38.2 8964.2 .48 8966.6 38.2 9005.7 2.31 9008.1 38.2 9047.5 .66 9049.8 38.2 6975.18 N 7010.09 N 7044.98 N 7079.94 N 7114.91 N 5502.08 E 5524.62 E 5546.95 E 5569.55 E 5592.63 E 12850.0 12900.0 12950.0 13000.0 13050.0 56.64 33.46 8111.2 56.49 33.24 8138.8 58.15 32.93 8165.8 58.18 32.92 8192.1 57.90 32.67 8218.6 9089.3 .80 9091.5 38.1 9130.9 .47 9133.1 38.1 9172.9 3.35 9175.1 38.1 9215.3 .07 9217.4 38.1 9257.6 .72 9259.6 38.1 7149.80 N 7184.65 N 7219.91 N 7255.57 N 7291.23 N 5615.75 E 5638.69 E 5661.66 E 5684.75 E 5707.73 E 13100.0 13150.0 13200.0 13250.0 13300.0 57.58 32.52 8245.3 57.29 32.48 8272.2 56.92 32.34 8299.3 56.49 32.13 8326.8 56.19 32.09 8354.5 9299.8 .68 9301.7 38.0 9341.8 .58 9343.6 38.0 9383.7 .77 9385.4 38.0 9425.3 .94 9427.0 38.0 9466 . 8 . 60 9468 . 4 37 . 9 7326.85 N 7362.39 N 7397.83 N 7433.19 N 7468.44 N 5730.51 E 5753.15 E 5775.65 E 5797.94 E 5820.07 E A Gyrodat a D i re c t i ona i Survey ~CO ALASKA INC. )RILLSITE PM2, WELL NO. ?OINT MCINTYRE, ALASKA ~ob Number: A0597GCE402 P2-19 Page 11 ~EASURED DEPTH feet I N C L AZIMUTH VERTICAL DEPTH deg. deg. feet VERTICAL DOGLEG CLOSURE SECTION SEVERITY DIST. AZIMUTH feet deg./ feet deg. 100 ft. HORIZONTAL COORDINATES feet L3350.0 [3400.0 [3450.0 [3500.0 [3550.0 55.45 31.64 8382.6 56.26 31.88 8410.7 56.76 32.20 8438.2 57.59 32.38 8465.3 57.40 32.39 8492.2 95'08.0 1.65 9509.5 37.9 9549.2 1.67 9550.7 37.9 9590.8 1.12 9592.2 37.9 9632.6 1.70 9634.0 37.8 9674.7 .39 9676.0 37.8 7503.57 N 5841.90 E 7538.76 N 5863.68 E 7574.10 N 5885.81 E 7609.62 N 5908.25 E 7645.23 N 5930.84 E k3600.0 13650.0 13700.0 13750.0 13800.0 56.77 32.23 8519.4 56.34 32.22 8546.9 55.96 32.30 8574.8 55.67 32.10 8602.9 57.36 31.87 8630.5 9716.5 1.28 9717.7 37.8 9758.1 .87 9759.3 37.8 9799.5 .77 9800.6 37.7 9840.7 .66 9841.8 37.7 9882.3 3.40 9883.3 37.7 7680.70 N 5953.27 E 7716.00 N 5975.52 E 7751.11 N 5997.68 E 7786.11 N 6019.72 E 7821.48 N 6041.81 E 13850.0 13900.0 13950.0 14000.0 14050.0 56.88 31.78 8657.6 56.34 31.50 8685.1 55.76 31.30 8713.1 55.31 31.19 8741.4 54.46 30.67 8770.1 9924.1 .96 9925.0 37.7 9965.7 1.18 9966.6 37.6 10007.0 1.21 10007.8 37.6 10048.0 .93 10048.8 37.6 10088.7 1.89 10089.4 37.6 7857.15 N 6063.96 E 7892.70 N 6085.86 E 7928.10 N 6107.47 E 7963.34 N 6128.85 E 7998.43 N 6149.87 E 14100.0 14150.0 14200.0 14250.0 14300.0 54.55 30.66 8799.1 54.18 30.43 8828.3 53.18 30.37 8857.9 52.67 30.15 8888.0 52.61 30.15 8918.4 10129.1 .19 10129.8 37.5 10169.5 .84 10170.1 37.5 10209.6 2.00 10210.1 37.5 10249.2 1.08 10249.7 37.4 10288.6 .11 10289.1 37.4 8033.44 N 6170.63 E 8068.44 N 6191.28 E 8103.19 N 6211.67 E 8137.64 N 6231.78 E 8172.01 N 6251.74 E 14350.0 14400.0 14450.0 14500.0 14550.0 52.10 29.96 8948.9 51.87 30.19 8979.7 51.54 29.97 9010.7 52.23 30.24 9041.6 52.17 29.80 9072.2 10328.0 1.07 10328.4 37.4 10367.1 .58 10367.5 37.4 10406.0 .75 10406.4 37.3 10445.1 1.44 10445.4 37.3 10484.3 .72 10484.6 37.3 8206.27 N 6271.57 E 8240.36 N 6291.31 E 8274.32 N 6310.98 E 8308.35 N 6330.71 E 8342.55 N 6350.47 E A Gyroda t a D i re c t i ona i Survey ~CO ALASKA INC. )RILLSITE PM2, WELL NO. P2-19 ?OINT MCINTYRE, ALASKA Iob Number: A0597GCE402 Page 12 4EASURED I N C L AZIMUTH VERTICAL VERTICAL DOGLEG CLOSURE DEPTH DEPTH SECTION SEVERITY DIST. AZIMUTH feet deg. deg. feet feet deg./ feet deg. 100 ft. HORIZONTAL COORDINATES feet [4600.0 52.28 29.36 9102.8 10523.5 .72 10523.8 37.3 8376.92 N 6369.98 E Final Station Closure: Distance: 10523.76 ft Az: 37.25 deg. A Gyroda t a D i re c t i ona I Survey for ARCO ALASKA INC. DRILLSITE PM2, WELL NO. P2-19 POINT MCINTYRE, ALASKA ~ob Number: SUB402 Run Date: 24-May-97 09:00:00 Surveyor: TOM STODDARD Calculation Method: MINIMUM CURVATURE Survey Latitude: 70.450000 deg. N Sub-sea Correction from Vertical Reference: 46 ft. Azimuth Correction: ~yro: Bearings are Relative to True North Proposed Well Direction: 36.870 deg Vertical Section Calculated from Well Head Location Closure Calculated from Well Head Location Horizontal Coordinates Calculated from Local Horizontal Reference A Gyroda t a D i re c t i ona i Survey %RCO ALASKA INC. DRILLSITE PM2, WELL NO. ?OINT MCINTYRE, ALASKA Iob Number: SUB402 P2-19 Page SUBSEA DEPTH feet I N C L AZIMUTH VERTICAL DEPTH deg. deg. feet VERTICAL DOGLEG CLOSURE SECTION SEVERITY DIST. AZIMUTH feet deg./ feet deg. 100 ft. HORIZONTAL COORDINATES feet -46.0 100.0 200.0 300.0 400.0 .00 0.00 0.0 .45 58.40 146.0 .56 78.00 246.0 .64 64.56 346.0 .92 63.74 446.0 0.0 0.00 0.0 0.0 .6 .40 1.0 45.5 1.2 .36 1.9 63.7 2.1 .25 3.0 67.8 3.3 .29 4.7 66.4 0.00 N 0.00 E .36 N .47 E .59 N 1.27 E .93 N 2.25 E 1.53 N 3.48 E 500.0 600.0 700.0 800.0 900.0 1.47 61.83 546.0 2.10 52.52 646.0 2.53 46.46 746.0 3.16 44.62 846.0 3.73 45.13 946.0 5.2 .57 7.3 65.0 8.1 .71 10.9 62.0 12.1 .52 15.3 58.0 17.0 .63 20.8 54.5 23.0 .60 27.2 52.0 2.51 N 5.32 E 4.26 N 7.88 E 6.91 N 10.92 E 10.40 N 14.45 E 14.67 N 18.70 E 1000.0 1100.0 1200.0 1300.0 1400.0 4.61 48.45 1046.0 5.90 53.35 1146.0 7.33 57.57 1246.0 9.00 58.75 1346.0 11.20 59.14 1446.0 30.1 .91 35.3 50.8 39.0 1.38 45.7 50.9 50.0 1.52 58.4 52.0 63.3 1.66 74.0 53.3 79.8 2.18 93.4 54.5 19.62 N 24.04 E 25.33 N 31.22 E 31.83 N 40.81 E 39.37 N 53.02 E 48.55 N 68.28 E 1500.0 1600.0 1700.0 1800.0 1900.0 13.52 57.89 1546.0 15.81 55.23 1646.0 19.05 53.28 1746.0 25.15 49.78 1846.0 30.98 48.36 1946.0 100.2 2.33 117.4 55.3 124.8 2.33 143.6 55.6 154.1 3.52 175.6 55.3 192.8 7.02 215.9 54.6 245.9 3.93 265.2 53.3 60.04 N 86.97 E 74.47 N 108.70 E 92.42 N 133.67 E 117.36 N 164.91 E 153.22 N 205.49 E 2000.0 2100.0 2200.0 2300.0 2400.0 33.63 48.48 2046.0 35.59 47.39 2146 . 0 36.78 45.55 2246.0 37.95 46.02 2346.0 40.76 43.55 2446.0 307.5 2.62 346.6 52.4 375.3 1.81 404.2 51.6 447.7 .57 463.4 50.8 522.8 1.34 554.2 50.1 603.4 3.20 650.3 49.4 194.81 N 252.79 E 240.95 N 304.20 E 291.76 N 357.17 E 344.71 N 411.78 E 402.22 N 469.44 E A Gyroda t a D i re c t i ona i Survey ARCO ALASKA INC. DRILLSITE PM2, WELL NO. POINT MCINTYRE, ALASKA Job Number: SUB402 P2-19 Page SUBSEA DEPTH feet I N C L AZIMUTH VERTICAL DEPTH deg. deg. feet VERTICAL SECTION feet DOGLEG CLOSURE SEVERITY DIST. AZIMUTH deg. / feet deg. 100 ft. HORIZONTAL COORDINATES feet 2500 2600 2700 2800 2900 .0 .0 .0 .0 .0 43 . 72 43 . 25 2546 . 0 47.47 46.10 2646.0 49.39 45.39 2746.0 52.15 44.57 2846.0 55.03 43.75 2946.0 693.6 794.1 906.9 1026.9 1162.5 2.97 717.9 48.6 3.22 825.5 48.1 .71 938.7 47.8 2.34 1054.7 47.5 1.42 1216.6 47.1 468.67 N 531.05 E 540.46 N 602.85 E 620.05 N 684.74 E 705.90 N 770.27 E 804.35 N 864.95 E 3000 3100 3200 3300 3400 .0 .0 .0 .0 .0 57.26 44.75 3046.0 58.62 46.67 3146.0 59.59 48.55 3246.0 54.82 45.62 3346.0 52.69 43.79 3446.0 1309.1 1468.8 1633.7 1788.9 1924.2 1.78 1341.3 46.8 1.16 1511.6 46.7 1.04 1683.5 46.7 4.50 1850.6 46.8 1.82 1970.9 46.6 909.93 N 1022.95 N 1136.32 N 1243.10 N 1340.65 N 968.59 E 1084.11 E 1207.72 E 1324.09 E 1419.42 E 3500 3600 3700 3800 3900 .0 .0 .0 .0 .0 50.88 44.85 3546.0 53.73 43.02 3646.0 55.46 41.96 3746.0 56.28 44.20 3846.0 58.42 45.34 3946.0 2048.1 2177.6 2317.5 2464.2 2618.9 .53 2087.5 46.5 .91 2247.0 46.3 .32 2369.5 46.1 .10 2535.2 45.9 .40 2662.2 45.9 1430.12 N 1524.03 N 1627.63 N 1735.36 N 1845.09 N 1506.73 E 1597.36 E 1692.28 E 1793.19 E 1904.66 E 4000 4100 4200 4300 4400 .0 .0 .0 .0 .0 58.31 44.98 4046.0 57.61 44.59 4146.0 57.05 44.75 4246.0 55.08 44.36 4346.0 54.95 41.21 4446.0 2779.5 2938.2 3092.8 3241.3 3381.0 .19 2832.4 45.9 .55 3001.9 45.8 .46 3170.0 45.7 .99 3294.3 45.7 .48 3457.0 45.6 1959.73 N 2073.37 N 2184.34 N 2290.93 N 2394.03 N 2019.47 E 2132.48 E 2242.25 E 2347.57 E 2442.94 E 4500.0 4600.0 4700.0 4800.0 4900.0 55.97 38.63 4546.0 57 . 58 36 . 73 4646 . 0 56 . 08 32 . 88 4746 . 0 57.32 30.99 4846.0 56.40 30.73 4946.0 3526.9 3680.6 3833.9 3985.2 4137.4 .22 3580.3 45.3 .11 3746.8 45.0 .35 3870.4 44.6 .69 4033.3 44.1 .41 4196.2 43.7 2506.50 N 2627.97 N 2753.17 N 2883.01 N 3014.32 N 2536.23 E 2630.42 E 2718.90 E 2798.00 E 2876.52 E A Gyroda t a D i r e c t i onal Survey %RCO ALASKA INC. )RILLSITE PM2, WELL NO. ?OINT MCINTYRE, ALASKA Iob Number: SUB402 P2 -19 Page SUBSEA DEPTH feet I N C L AZIMUTH VERTICAL DEPTH deg. deg. feet VERTICAL SECTION feet DOGLEG CLOSURE SEVERITY DIST. AZIMUTH deg./ feet deg. 100 ft. HORIZONTAL COORDINATES feet 5000.0 5100.0 5200.0 5300.0 5400.0 55.81 31.53 5046.0 56.01 33.35 5146.0 57.85 33.79 5246.0 58.68 33.31 5346.0 58.91 32.65 5446.0 4285.3 4433.1 4586.2 4746.6 4910.1 .70 4317.6 43.2 .31 4480.9 42.9 .08 4647.0 42.6 .45 4773.0 42.3 .02 4941.6 42.0 3141.95 N 3266.12 N 3393.94 N 3527.63 N 3665.14 N 2952.97 E 3033.68 E 3118.48 E 3207.43 E 3296.66 E 5500.0 5600.0 5700.0 5800.0 5900.0 58.81 33.08 5546.0 58.00 33.03 5646.0 58.09 32.74 5746.0 58.03 33.31 5846.0 57.04 35.30 5946.0 5075 5237 5398 5559 5716 .8 .7 .6 .0 .9 .56 5110.8 41.7 .27 5279.0 41.4 .48 5447.2 41.2 .42 5573.3 40.9 .98 5741.0 40.7 3804.65 N 3940.79 N 4076.13 N 4211.44 N 4342.81 N 3386.76 E 3475.10 E 3562.76 E 3649.76 E 3737.67 E 6000.0 6100.0 6200.0 6300.0 6400.0 57.98 38.14 6046.0 57.79 36.91 6146.0 57.46 35.57 6246.0 58.13 34.33 6346.0 59.50 34.35 6446.0 5873 6033 6196 6354 6521 .4 .9 .3 .9 .5 .10 5909.4 40.6 .15 6079.0 40.5 .98 6248.5 40.4 .86 6374.9 40.3 .70 6545.6 40.1 4467.98 N 4595.30 N 4725.45 N 4855.60 N 4993.97 N 3831.68 E 3929.51 E 4026.50 E 4117.44 E 4210.56 E 6500.0 6600.0 6700.0 6800.0 6900.0 56.70 32.44 6546.0 57.13 31.97 6646.0 57.81 32.05 6746.0 58.10 32.42 6846.0 56.77 33.68 6946.0 6681 6834 6992 7152 7307 .7 .2 .4 .8 .2 .10 6713.7 40.0 .58 6879.8 39.8 .36 7005.7 39.6 .75 7174.2 39.5 .19 7341.0 39.3 5127.26 N 5256.73 N 5391.56 N 5528.12 N 5657.25 N 4299.83 E 4381.35 E 4465.24 E 4550.48 E 4635.69 E 7000.0 7100.0 7200.0 7300.0 7400.0 56.88 33.45 7046.0 57.44 32.66 7146.0 55.39 32.51 7246.0 55.95 32.44 7346.0 56.40 33.08 7446.0 7460.3 7614.9 7764.6 7908.2 8057.2 .43 7507.7 39.2 .94 7633.2 39.1 .44 7798.1 39.0 .01 7920.5 38.8 .92 8085.9 38.7 5785.01 N 5914.59 N 6041.07 N 6162.78 N 6288.60 N 4720.52 E 4805.42 E 4886.22 E 4963.26 E 5043.82 E LRCO ALASKA INC. )RILLSITE PM2, WELL NO. ?OINT MCINTYRE, ALASKA Iob Number: SUB402 A Gy r o d a t a P2-19 Direct i o n a 1 Survey Page SUBSEA DEPTH feet I N C L AZIMUTH VERTICAL DEPTH deg. deg. feet VERTICAL SECTION feet DOGLEG CLOSURE SEVERITY DIST. AZIMUTH deg./ feet deg. 100 ft. HORIZONTAL COORDINATES feet 7500 7600 7700 7800 7900 .0 .0 .0 .0 .0 56.66 33.64 7546.0 8208 57.74 34.00 7646.0 8363 58.52 34.05 7746.0 8525 57.76 33.59 7846.0 8685 56.64 33.14 7946.0 8840 .0 .2 .3 .7 .5 1.00 8252.2 38.6 1.43 8378.1 38.5 · 24 8548.0 38.5 .56 8717.1 38.4 .47 8884.0 38.3 6414.81 N 6543.67 N 6678.09 N 6811.25 N 6940.86 N 5126.84 E 5213.77 E 5304.73 E 5394.49 E 5479.74 E 80O0 8100 8200 8300 8400 .0 .0 .0 .0 .0 56.48 32.97 8046.0 8989 56.94 33.15 8146.0 9142 57.57 32.52 8246.0 9300 56.28 32.10 8346.0 9454 56.99 32.25 8446.0 9602 .8 .2 .9 .1 .8 1.61 9008.1 38.2 1.25 9175.1 38.1 .68 9343.6 38.0 .71 9468.4 37.9 1.29 9634.0 37.8 7066.61 N 7194.12 N 7327.80 N 7457.62 N 7584.27 N 5560.93 E 5644.85 E 5731.11 E 5813.28 E 5892.23 E 8500.0 8600.0 8700.0 8800.0 8900.0 56.35 32.22 8546.0 9756 57.09 31.82 8646.0 9906 55.17 31.10 8746.0 10054 53.58 30.40 8846.0 10193 52.15 29.98 8946.0 10324 .7 .2 .6 .5 .2 .88 9759.3 37.8 2.00 9925.0 37.7 1.08 10089.4 37.6 1.53 10210.1 37.5 .98 10328.4 37.4 7714.79 N 7841.88 N 7969.01 N 8089.24 N 8203.00 N 5974.76 E 6054.48 E 6132.25 E 6203.49 E 6269.68 E 9000.0 52.22 9056.8 52.28 30.18 9046.0 29.36 9102.8 10450.8 10523.5 1.34 10484.6 37.3 .72 10523.8 37.3 8313.31 N 8376.92 N 6333.58 E 6369.98 E Final Station Closure: Distance: 10523.76 ft Az: 37.25 deg. 4. QUALITY CONTROL QUALITY CONTROL REPORT JOB NUMBER: A0597GCE402 TOOL NUMBER: 768 MAXIMUM GYRO TEMPERATURE: 80.31 C MAXIMUM AMBIENT TEMPERATURE: 80.24 C MAXIMUM INCLINATION: 59.69 AVERAGE AZIMUTH: 37.25 WIRELINE REZERO VALUE: N/A REZERO ERROR / K: N/A CALIBRATION USED FOR FIELD SURVEY: 1995 CALIBRATION USED FOR FINAL SURVEY: 1995 PRE JOB MASS BALANCE OFFSET CHECK: -.25 POST JOB MASS BALANCE OFFSET CHECK~: USED O.O/N/A CONTINUOUS CONDITION OF SHOCK WATCHES UPON ARRIVAL AT RIG: 2 OFF -.30 UPON COMPLETION OF SURVEY: 2 OFF UPON RETURN TO ATLAS 2 OFF BOTTOM LINE COMPARISIONS M.D. INC AZIMUTH TVD NORTHING EASTING MWD 14591 52.17 29.63 9084 8419 6316 FINAL SURVEY 14600 52.28 29.36 9102 8376 6369 FUNCTION TEST JOB NUMBER: A0597GCE402 5 Survey stations were collected at the measured depth shown below. The tables show the repeatability of the gyro tool in both inclination and azimuth at one measured depth. INCLINATION M.D. ft I 2 3 4 5 1700 16.93 16.93 16.93 16.93 16.93 AZIMUTH M.D. ft 1 2 3 4 5 1700 54.24 54.21 54.34 54.32 54.18 5. EQUIPMENT AND CHRONOLOGICAL REPORT EQUIPMENT REPORT JOB NUMBER: A0597GCE402 DOWNHOLE ELECTRONICS SURFACE ELECTRONICS PRIMARY TOOL No. 768 GYRO SECTION DATA SECTION POWER SECTION BACKUP TOOL No. 773 GYRO SECTION DATA SECTION POWER SECTION A0159 C0100 C0086 A0164 C0111 C0112 COMPUTER A0349 POWER SUPPLY PRINTER A0079 INTERFACE A0143 COMPUTER A0222 POWER SUPPLY PRINTER A0029 INTERFACE A0055 A0085 A0107 WIRELINE COMPANY: CABLE SIZE: 15/32" ATLAS RUNNING GEAR 2.5" HOUSING IN COMBO W/MAC TOOL TOTAL LENGTH OF TOOL 80' MAXIMUM O.D.: 5.5 INCHES TOTAL WEIGHT OF TOOL: 1000 POUNDS CHRONOLOGICAL REPORT JOB NUMBER· A0597GCE402 THURSDAY, 5/23/97 14:20 TO SLOPE- CHARTER 17:00 ARRIVE ATLAS CK TOOLS O.K. SATURDAY,05/24/97 04:15 05:00 06:00 07:00 08:30 11:00 19:30 23:00 TO LOCATION ARRIVE LOCATION MU TOOL, RU SCHLUMBERGER PU TOOL START INRUN SURVEY SURVEY CONTINUOUS TO 14600' MAC OUTRUN CONTINUOUS SUNDAY, 05/25/97 00:00 01:00 08:00 13:00 15:00 RIG DOWN RTN TO ATLAS PROCESS SURVEY/CHECK TOOL RETURN TO RIG W/RESULTS SEND TOOLS TO KUPARUK FOR NEXT JOB SI ARCO ALASKA INC Point McIntyre / P2-19 500292276500 NORTH SLOPE BOROUGH COMPUTATION DATE: 6/10/97 -SUN DRILLING SERVICES ANCHOR_AGE ALASKA DATE OF SURVEY: MWD SURVEY JOB NUMBER: AK-MM-70131 KELLY BUSHING ELEV. = 46.30 OPERATOR: ARCO ALASKA INC PAGE 051997 FT. TRUE SUB-SEA MEASD VERTICAL VERTICAL DEPTH DEPTH DEPTH COURS INCLN DG MN COURSE DLS TOTAL DIRECTION RECTANGULAR COORDINATES DEGREES DG/100 NORTH/SOUTH EAST/WEST VERT. SECT. .00 .00 -46.30 34.50 34.50 -11.80 180.56 180.56 134.26 271.19 271.19 224.89 360.50 360.49 314.19 0 0 0 0 0 14 0 3'1 0 46 N .00 E .00 .00N .00E .00 N .00 E .00 .00N .00E .00 N 65.79 E .16 .13N .28E .27 N 54.28 E .32 .44N .79E .83 N 75.71 E .39 .83N 1.70E 1.69 449.86 449.84 403.54 540.63 540.60 494.30 630.53 630.46 584.16 720.34 720.20 673.90 815.28 815.03 768.73 40 5 7 25 4 N 82.60 E .15 1.05N 2.82E 2.53 N 58.24 E .60 1.57N 4.09E 3.71 N 53.55 E 1.17 3.01N 6.16E 6.11 N 48.67 E .40 5.26N 8.93E 9.57 N 41.29 E .77 8.50N 12.12E 14.07 910.09 909.69 863.39 1004.14 1003.54 957.24 1097.04 1096.10 1049.80 1192.13 1190.62 11.44.32 1286.84 1284.53 1238.23 3 24 4 3 5 37 6 48 8 1 N 38.44 E .39 12.61N 15.54E 19.42 N 47.46 E .94 17.05N 19.73E 25.48 N 48.47 E 1.69 22.29N 25.56E 33.17 N 57.20 E 1.59 28.44N 33.79E 43.03 N 58.14 E 1.29 34.97N 44.13E 54.46 1381.27 1377.82 1331.52 1475.75 1470.54 1424.24 1570.01 1562.23 1515.93 1665.01 1653.95 1607.65 1759.46 1744.25 1697.95 9 45 12 13 14 31 15 37 18 27 N 59.19 E 1.84 42.55N 56.61E 68.01 N 60.04 E 2.62 51.65N 72.16E 84.62 N 56.35 E 2.60 63.19N 90.65E 104.94 N 55.35 E 1.18 77.07N lll.09E 128.31 N 53.25 E 3.07 93.24N 133.53E 154.71 1854.36 1833.11 1786.81 22 34 1949.19 1918.21 1871.91 29 40 2043.07 1998.69 1952.39 32 17 2137.92 2077.96 2031.66 34 17 2233.02 2155.86 2109.56 35 42 N 50.73 E 4.45 113.77N 159.68E 186.82 N 47.50 E 7.62 141.19N 191.12E 227.62 N 48.68 E 2.86 173.45N 227.09E 275.01 N 48.61 E 2.11 207.84N 266.16E 325.97 N 47.30 E 1.69 244.37N 306.66E 379.49 2327.88 2232.15 2185.85 2422.20 2307.27 2260.97 2516.44 2381.43 2335.13 2611.33 2454.01 2407.71 2706.58 2524.69 2478.39 37 11 37 13 38 57 41 15 42 54 N 44.75 E 2.23 283.51N 347.19E 435.12 N 46.07 E .85 323.55N 387.81E 491.52 N 45.88 E 1.84 363.95N 429.61E 548.93 N 43.99 E 2.73 407.23N 472.76E 609.44 N 41.60 E 2.42 454.07N 516.09E 672.92 2801.69 2592.99 2546.69 2896.38 2658.02 2611.72 2991.05 2720.37 2674.07 3085.79 2781.56 2735.26 3180.36 2841.13 2794.82 45 47 49 49 52 17 57 39 53 0 N 44.08 E 3.10 502.58N 561.12E 738.73 N 46.08 E 3.19 551.15N 609.86E 806.84 N 45.45 E 1.86 600.84N 660.89E 877.21 N 44.59 E .74 651.97N 712.05E 948.80 N 44.71 E 2.24 704.21N 763.65E 1021.56 ORIGINAl_ RECEIVED dUN 1 8 199 4Jaska Oil & Gas Cons. Anchorage SUN DRILLING SERVICES ANCHOR_AGE ALASKA PAGE ARCO ALASKA INC Point McIntyre / P2-19 500292276500 NORTH SLOPE BOROUGH COMPUTATION DATE: 6/10/97 DATE OF SURVEY: 051997 MWD SURVEY JOB NUMBER: AK-MM-70131 KELLY BUSHING ELEV. = 46.30 FT. OPERATOR: ARCO ALASKA INC TRUE SUB-SEA MEASD VERTICAL VERTICAL DEPTH DEPTH DEPTH COURS INCLN DG MN COURSE DLS TOTAL DIRECTION RECTANGULAR COORDINATES DEGREES DG/100 NORTH/SOUTH EAST/WEST VERT. SECT. 3275.21 2897.91 2851.61 54 25 3368.80 2951.65 2905.35 55 28 3462.29 3004.23 2957.93 56 4 3557.89 3056.37 3010.07 57 49 3652.38 3106.09 3059.79 58 40 N 43.55 E 2.73 758.74N 816.54E N 42.72 E 1.34 814.65N 868.92E N 44.18 E 1.44 870.76N 922.08E N 44.09 E 1.83 928.26N 977.87E N 44.77 E 1.10 985.64N 1034.11E 1096.91 1173.07 1249.85 1329.33 1408.98 3747.36 3155.53 3109.23 58 35 3842.07 3204.53 3158.23 59 5 3936.32 3252.49 3206.19 59 43 4031.29 3301.45 3255.15 58 12 4125.82 3353.49 3307.19 54 58 N 46.23 E 1.32 1042.48N 1091.95E N 46.60 E .63 1098.35N 1150.66E N 47.95 E 1.40 1153.39N 1210.26E N 47.39 E 1.67 1208.18N 1270.42E N 45.59 E 3.77 1262.49N 1327.65E 1489.15 1569.08 1648.87 1728.80 1806.58 4220.68 3408.72 3362.42 53 4315.72 3465.84 3419.54 52 4410.95 3524.86 3478.56 51 4505.90 3583.65 3537.35 52 4599.96 3639.94 3593.64 54 47 18 4 24 3 N 43.53 E 2.16 1317.42N 1381.76E N 43.54 E 1.57 1372.48N 1434.08E N 43.96 E 1.34 1426.46N 1485.75E N 44.12 E 1.41 1480.05N 1537.58E N 42.70 E 2.13 1534.79N 1589.34E 1882.99 1958.43 2032.61 2106.59 2181.44 4692.89 3694.05 3647.75 54 43 4789.70 3749.34 3703.04 55 37 4883.74 3802.06 3755.76 56 11 4978.96 3854.69 3808.39 56 42 5073.77 3905.78 3859.48 58 4 N 42.71 E .71 1590.31N 1640.58E N 41.45 E 1.42 1649.29N 1693.83E N 43.65 E 2.03 1706.64N 1746.48E N 43.92 E .59 1763.93N 1801.39E N 45.41 E 1.96 1820.71N 1857.53E 2256.60 2335.73 2413.20 2491.98 2571.09 5167.84 5261.29 5354 85 5449.78 5544 02 3955.03 3908.73 58 47 4003.61 3957.31 58 32 4052.42 4006.12 58 32 4102.14 4055.84 58 17 4151.97 4105.67 57 51 N 44.33 E 1.25 1877.51N 1914.07E N 44.45 E .29 1934.56N 1969.91E N 44.45 E .00 1991.54N 2025.81E N 44.28 E .31 2049.35N 2082.35E N 44.05 E .50 2106.73N 2138.08E 2650.45 2729.59 2808.71 2888.89 2968.23 5638 59 5731.10 5824 51 5916.90 6011 04 4202.46 4156.16 4252.12 4205.82 4303.00 4256.70 4355.02 4308.72 4409.20 4362.90 57 36 57 27 56 31 54 56 54 47 N 43.90 E .30 2164.27N 2193.60E N 44.62 E .68 2220.17N 2248.08E N 44.59 E 1.01 2275.94N 2303.08E N 44.25 E 1.74 2330.46N 2356.52E N 41.83 E 2.11 2386.72N 2409.05E 3047.58 3124.99 3202.60 3278.28 3354.81 6103 37 6196.37 6291.22 6383.16 6478.97 4461.77 4415.47 55 47 4513.84 4467.54 56 5 4566.17 4519.88 56 55 4615.60 4569.30 58 2 4666.65 4620.35 57 33 N 40.28 E 1.76 2443.95N 2458.89E N 38.56 E 1.57 2503.47N 2507.81E N 37.37 E 1.36 2565.84N 2556.47E N 36.77 E 1.34 2627.69N 2603.20E N 36.26 E .67 2692.85N 2651.44E 3430.50 3507.47 3586.55 3664.07 3745.14 SUN DRILLING SERVICES ANCHORAGE ALASKA PAGE ARCO ALASKA INC Point McIntyre / P2-19 500292276500 NORTH SLOPE BOROUGH COMPUTATION DATE: 6/10/97 DATE OF SURVEY: 051997 MWD SURVEY JOB NUMBER: AK-MM-70131 KELLY BUSHING ELEV. = 46.30 OPERATOR: ARCO ALASKA INC FT. TRUE SUB-SEA MEASD VERTICAL VERTICAL DEPTH DEPTH DEPTH COURS INCLN DG MN COURSE DLS TOTAL DIRECTION RECTANGULAR COORDINATES DEGREES DG/100 NORTH/SOUTH EAST/WEST VERT. SECT. 6572.97 4717.75 4671.45 56 34 6665.23 4768.62 4722.32 56 30 6759.98 4820.00 4773.71 57 48 6854.35 4870.56 4824.26 57 24 6947.52 4921.05 4874.75 56 57 N 33.53 E 2.65 2757.53N 2696.57E N 30.92 E 2.36 2822.63N 2737.60E N 30.16 E 1.54 2891.18N 2778.04E N 30.78 E .70 2959.87N 2818.45E N 30.94 E .50 3027.08N 2858.61E 3823.97 3900.66 3979.77 4058.96 4136.84 7068.03 4987.55 4941.25 56 2 7163.13 5040.78 4994.48 55 52 7257.93 5093.80 5047.50 56 5 7352.62 5146.73 5100.43 55 56 7448.17 5199.40 5153.10 57 8 N 30.21 E .91 3113.60N 2909.73E N 31.04 E .75 3181.42N 2949.88E N 33.31 E 2.00 3247.92N 2991.72E N 32.90 E .40 3313.69N 3034.60E N 33.11 E 1.27 3380.54N 3078.02E 4236.72 4315.06 4393.37 4471.72 4551.24 7542.87 5250.22 5203.92 57 7637.56 5300.53 5254.23 57 7732.88 5350.54 5304.24 58 7827.50 5399.92 5353.62 58 7920.85 5448.53 5402.23 58 57 51 5O 14 59 N 33.09 E .86 3447.48N 3121.66E N 33.92 E .75 3514.36N 3165.94E N 33.04 E 1.30 3582.04N 3210.70E N 32.37 E .88 3649.96N 3254.31E N 32.12 E .84 3717.36N 3296.83E 4630.98 4711.06 4792.06 4872.56 4951.99 8016.71 5498.02 5451.73 58 50 8110.50 5546.67 5500.37 58 40 8205.25 5596.26 5549.96 58 11 8298.01 5645.34 5599.04 57 55 8391.93 5694.98 5648.68 58 16 N 32.60 E .46 3786.71N 3340.77E N 32.88 E .31 3854.16N 3384.14E N 32.16 E .83 3922.23N 3427.54E N 32.68 E .56 3988.67N 3469.74E N 32.48 E .41 4055.85N 3512.67E 5033.83 5113.81 5194.31 5272.78 5352.29 8485.90 5744.57 5698.27 58 1 8580.72 5794.69 5748.39 58 9 8676.08 5845.17 5798.87 57 55 8767.94 5893.93 5847.63 57 58 8861.41 5944.13 5897.83 57 2 N 32.28 E .31 4123.27N 3555.42E N 31.90 E .36 4191.46N 3598.18E N 32.66 E .72 4259.85N 3641.38E N 32.27 E .36 4325.54N 3683.17E N 34.03 E 1.87 4391.54N 3726.27E 5431.86 5512.07 5592.71 5670.34 5749.00 8954.16 5994.25 5947.95 9047.03 6043.75 5997.45 9141.61 6093.69 6047.39 9234.82 6143.00 6096.70 9329.67 6193.03 6146.73 57 32 58 2 58 12 57 54 58 25 N 36.13 E 1.98 4455.40N 3771.12E N 36.98 E .94 4518.52N 3817.92E N 36.51 E .46 4582.87N 3865.97E N 36.65 E .35 4646.39N 3913.11E N 35.15 E 1.45 4711.66N 3960.35E 5826.99 5905.57 5985.88 6064.98 6145.54 9423.71 6242.82 6196.52 57 38 9516.05 6292.16 6245.86 57 46 9610.71 6342.41 6296.11 58 5 9702.55 6390.02 6343.72 59 27 9796.53 6437.79 6391.49 59 27 N 35.41 E .86 4776.78N 4006.43E N 34.85 E .53 4840.62N 4051.34E N 34.24 E .65 4906.70N 4096.83E N 33.25 E 1.74 4972.00N 4140.45E N 33.76 E .47 5039.48N 4185.12E 6225.29 6303.30 6383.46 6461.87 6542.66 SP[ SUN DRILLING SERVICES ANCHORAGE ALASKA PAGE ARCO ALASKA INC Point McIntyre / P2-19 500292276500 NORTH SLOPE BOROUGH COMPUTATION DATE: 6/10/97 DATE OF SURVEY: 051997 MWD SURVEY JOB NUMBER: AK-MM-70131 KELLY BUSHING ELEV. = 46.30 FT. OPERATOR: ARCO ALASKA INC TRUE SUB-SEA MEASD VERTICAL VERTICAL DEPTH DEPTH DEPTH COURS INCLN DG MN COURSE DLS TOTAL DIRECTION RECTANGULAR COORDINATES DEGREES DG/100 NORTH/SOUTH EAST/WEST VERT. SECT. 9889.58 6486.02 6439.72 9983.48 6536.56 6490.26 10068.57 6583.23 6536.93 10164.06 6635.41 6589.11 10258.92 6686.29 6639.99 58 56 56 57 58 6 45 43 2 4 N 33.99 E 1.46 5105.54N 4229.47E N 32.19 E 2.17 5171.83N 4272.68E N 32.07 E .12 5232.08N 4310.52E N 31.28 E .77 5300.14N 4352.51E N 31.38 E 1.10 5368.52N 4394.13E 6622.12 6701.07 6771.97 6851.62 6931.30 10354.31 6736.92 6690.62 57 10449.44 6787.31 6741.01 58 10543.61 6837.08 6790.78 57 10638.53 6888.13 6841.83 56 10731.54 6938.97 6892.67 56 47 14 57 58 44 N 31.24 E .32 5437.59N 4436.15E N 30.85 E .58 5506.72N 4477.76E N 32.14 E 1.20 5574.88N 4519.52E N 33.38 E 1.50 5642.17N 4562.81E N 33.38 E .26 5707.21N 4605.66E 7011.76 7092.03 7171.62 7251.43 7329.16 10825.85 6990.59 6944.29 56 10918.12 7040.96 6994.66 56 11014.01 7093.04 7046.75 57 11107.84 7143.54 7097.24 57 11200.70 7194.50 7148.21 55 53 56 15 37 46 N 33.37 E .16 5773.12N 4649.08E N 32.84 E .48 5837.88N 4691.31E N 33.30 E .52 5905.35N 4735.24E N 32.17 E 1.09 5971.87N 4778.00E N 32.58 E 2.03 6037.42N 4819.55E 7407.95 7485.09 7565.42 7644.30 7721.67 11293.42 7246.92 7200.62 55 11388.24 7301.14 7254.84 54 11479.07 7352.52 7306.22 56 11573.95 7405.38 7359.08 56 11667.38 7457.05 7410.75 56 22 52 13 3 46 N 31.80 E .82 6102.14N 4860.30E N 31.83 E .52 6168.24N 4901.31E N 32.53 E 1.61 6231.63N 4941.20E N 31.90 E .58 6298.29N 4983.20E N 33.14 E 1.35 6363.91N 5025.04E 7797.89 7875.38 7950.02 8028.55 8106.16 11761.66 7509.16 7462.86 56 11856.53 7561.10 7514.80 57 11949.48 7611.41 7565.11 56 12043.81 7661.76 7615.46 58 12137.50 7710.63 7664.33 58 7 29 57 30 37 N 32.61 E .84 6429.90N 5067.69E N 34.31 E 2.08 6496.11N 5111.46E N 33.99 E .64 6560.79N 5155.34E N 33.76 E 1.66 6627.01N 5199.79E N 32.80 E .88 6693.84N 5243.65E 8184.54 8263.77 8341.83 8421.48 8501.26 12230.54 7759.28 7712.98 58 12325.49 7809.31 7763.01 58 12417.58 7858.46 7812.16 57 12509.81 7908.47 7862.17 56 12602.96 7959.66 7913.36 56 19 5 23 56 23 N 33.83 E 1.00 6760.11N 5287.21E N 32.78 E .97 6827.55N 5331.52E N 33.28 E .89 6892.84N 5373.97E N 33.07 E .52 6957.70N 5416.37E N 32.52 E .77 7023.12N 5458.52E 8580.41 8660.95 8738.65 8815.98 8893.61 12696.60 8011.88 7965.58 12790.17 8063.62 8017.32 12884.74 8115.46 8069.16 12976.72 8165.11 8118.81 13069.90 8214.54 8168.24 55 57 56 58 57 49 2 28 10 45 N 31.86 E .84 7088.89N 5499.93E N 32.99 E 1.65 7154.69N 5541.73E N 33.36 E .69 7220.89N 5585.01E N 32.90 E 1.91 7285.72N 5627.32E N 32.03 E .92 7352.37N 5669.72E 8971.07 9048.79 9127.72 9204.97 9283.73 S~ SUN DRILLING SERVICES ANCHOR3AGE ALASKA PAGE ARCO ALASKA INC Point McIntyre / P2-19 500292276500 NORTH SLOPE BOROUGH COMPUTATION DATE: 6/10/97 DATE OF SURVEY: 051997 MWD SURVEY JOB NUMBER: AK-MM-70131 KELLY BUSHING ELEV. = 46.30 FT. OPERATOR: ARCO ALASKA INC TRUE SUB-SEA MEASD VERTICAL VERTICAL DEPTH DEPTH DEPTH COURS INCLN DG MN COURSE DLS TOTAL DIRECTION RECTANGULAR COORDINATES DEGREES DG/100 NORTH/SOUTH EAST/WEST VERT. SECT. 13165.51 8265.98 8219.68 57 9 N 32.24 E .65 7420.61N 5712.59E 13261.21 8318.42 8272.12 56 24 N 31.74 E .90 7488.51N 5755.00E 13355.83 8371.34 8325.04 55 34 N 31.11 E 1.04 7555.43N 5795.89E 13450.95 8424.32 8378.02 56 44 N 32.28 E 1.60 7622.64N 5837.40E 13545.18 8475.56 8429.26 57 22 N 32.37 E .67 7689.46N 5879.68E 9364.04 9443.80 9521.88 9600.55 9679.38 13641.83 8528.36 8482.06 56 24 N 32.16 E 1.01 7757.91N 13736.22 8581.09 8534.79 55 39 N 32.24 E .80 7824.15N 13832.53 8634.43 8588.13 57 4 N 31.64 E 1.55 7892.20N 13927.55 8686.77 8640.47 56 4 N 31.09 E 1.15 7959.91N 14022.63 8740.54 8694.24 55 2 N 29.81 E 1.56 8027.50N 5922.90E 9760.07 5964.61E 9838.09 6007.03E 9917.97 6048.30E 9996.91 6088.04E 10074.82 14104.61 8787.92 8741.62 54 20 N 30.71 E 1.23 8085.28N 14114.17 8793.49 8747.19 54 23 N 30.70 E .41 8091.96N 14209.85 8849.98 8803.68 53 14 N 31.02 E 1.23 8158.25N 14305.28 8907.47 8861.17 52 39 N 29.80 E 1.19 8223.93N 14400.92 8966.13 8919.83 51 40 N 30.09 E 1.05 8289.38N 6121.75E 10141.28 6125.72E 10149.00 6165.33E 10225.80 6203.88E 10301.47 6241.59E 10376.46 14496.00 9024.87 8978.57 52 0 N 29.69 E .47 8354.20N 14591.18 9083.36 9037.06 52 10 N 29.63 E .18 8419.45N 14684.63 914.0.46 9094.16 52 30 N 29.24 E .48 8483.88N 14779.21 9197.63 9151.33 53 7 N 29.11 E .68 8549.67N 14874.57 9254.42 9208.12 53 45 N 28.72 E .74 8616.72N 6278.84E 10450.67 6316.00E 10525.16 6352.35E 10598.51 6389.08E 10673.18 6426.12E 10749.05 14969.72 9310.11 9263.81 54 35 N 29.35 E 1.02 8684.17N 15065.11 9364.72 9318.42 55 33 N 28.19 E 1.42 8752.72N 15161.70 9419.55 9373.25 55 16 N 27.80 E .45 8822.93N 15256.78 9474.17 9427.87 54 35 N 28.29 E .82 8891.62N 15351.27 9529.35 9483.05 53 56 N 27.44 E 1.01 8959.42N 6463.56E 10825.47 6501.20E 10902.90 6538.53E 10981.46 6575.11E 11058.36 6610.97E 11134.12 15433.17 9577.87 9531.57 53 23 N 27.30 E .69 15512.00 9624.88 9578.58 53 23 N 27.30 E .00 9018.01N 6641.30E 11199.19 9074.24N 6670.32E 11261.59 THE CALCULATION PROCEDURES ARE BASED ON THE USE OF THREE-DIMENSION MINIMUM CURVATURE METHOD. HORIZONTAL DISPLACEMENT = 11262.11 FEET AT NORTH 36 DEG. 19 MIN. EAST AT MD = 15512 VERTICAL SECTION RELATIVE TO WELL HEAD VERTICAL SECTION COMPUTED ALONG 36.87 DEG. TIE-IN SURVEY AT SURFACE 0.00' MD PROJECTED SURVEY AT 15,512.00' MD St SUN DRILLING SERVICES ANCHOR3AGE ALASKA PAGE Ai~CO ALASK3A INC Point McIntyre / P2-19 500292276500 NORTH SLOPE BOROUGH COMPUTATION DATE: 6/10/97 DATE OF SURVEY: 051997 JOB NUMBER: AK-MM-70131 KELLY BUSHING ELEV. = 46.30 OPERATOR: ARCO ALASKA INC FT. INTERPOLATED VALUES FOR EVEN 1000 FEET OF MEASURED DEPTH TRUE SUB-SEA MEASD VERTICAL VERTICAL DEPTH DEPTH DEPTH TOTAL RECTANGULAR COORDINATES NORTH/SOUTH EAST/WEST MD-TVD VERTICAL DIFFERENCE CORRECTION .00 .00 -46.30 .00 N .00 E 1000.00 999.41 953.11 16.85 N 19.51 E 2000.00 1962.04 1915.74 158.43 N 210.17 E 3000.00 2726.16 2679.86 605.63 N 665.75 E 4000.00 3284.96 3238.66 1190.18 N 1250.84 E .0O .59 .59 37.96 37.37 273.84 235.88 715.04 441.20 5000.00 3866.24 3819.94 1776.59 N 1813.59 E 6000.00 4402.83 4356.53 2380.00 N 2403.03 E 7000.00 4949.66 4903.36 3064.82 N 2881.23 E 8000.00 5489.38 5443.08 3774.66 N 3333.06 E 9000.00 6018.85 5972.55 4486.64 N 3793.93 E 1133.76 418.73 1597.17 463.40 2050.34 453.17 2510.62 460.28 2981.15 470.53 10000.00 6545.62 6499.32 5183.52 N 4280.04 E 11000.00 7085.47 7039.17 5895.50 N 4728.77 E 12000.00 7638.88 7592.58 6595.95 N 5179.03 E 13000.00 8177.39 8131.09 7302.33 N 5638.06 E 14000.00 8727.58 8681.28 8011.40 N 6078.82 E 3454.38 473.23 3914.53 460.15 4361.12 446.59 4822.61 461.49 5272.42 449.81 15000.00 9327.66 9281.36 8705.68 N 6475.66 E 15512.00 9624.88 9578.58 9074.24 N 6670.32 E 5672.34 399.92 5887.12 214.77 THE CALCULATION PROCEDURES ARE BASED ON THE USE OF THREE-DIMENSION MINIMUM CURVATURE METHOD. -SUN DRILLING SERVICES ANCHORAGE ALASKA PAGE ARCO ALASKA INC Point McIntyre / P2-19 500292276500 NORTH SLOPE BOROUGH COMPUTATION DATE: 6/10/97 DATE OF SURVEY: 051997 JOB NUMBER: AK-MM-70131 KELLY BUSHING ELEV. = 46.30 FT. OPERATOR: ARCO ALASKA INC INTERPOLATED VALUES FOR EVEN 100 FEET OF SUB-SEA DEPTH TRUE MEASD VERTICAL DEPTH DEPTH SUB-SEA TOTAL VERTICAL RECTANGULAR COORDINATES MD-TVD DEPTH NORTH/SOUTH EAST/WEST DIFFERENCE VERTICAL CORRECTION .00 .0 46.30 46.3 146.30 146.3 246.30 246.3 346.31 346.3 -46.30 .00 N .00 E .0 .00 .00 N .00 E .0 100.00 .07 N .15 E .0 200.00 .31 N .60 E .0 300.00 .78 N 1.52 E .0 .00 .00 .00 .01 446.32 446.3 546.33 546.3 646.38 646.3 746.46 746.3 846.59 846.3 400.00 1.04 N 2.78 E .0 500.00 1.63 N 4.18 E .0 600.00 3.36 N 6.63 E .0 700.00 5.99 N 9.76 E .1 800.00 9.76 N 13.23 E .2 .01 .01 .05 .08 .13 946.77 946.3 1047.02 1046.3 1147.50 1146.3 1248.23 1246.3 1349.29 1346.3 900.00 14.32 N 16.91 E .4 1000.00 19.16 N 22.04 E .7 1100.00 25.57 N 29.42 E 1.2 1200.00 32.13 N 39.55 E 1.9 1300.00 39.78 N 51.95 E 2.9 .17 .25 .48 .73 1.06 1450.94 1446.3 1553.56 1546.3 1657.06 1646.3 1761.63 1746.3 1868.73 1846.3 1400.00 49.03 N 67.60 E 4.6 1500.00 60.90 N 87.21 E 7.2 1600.00 75.85 N 109.33 E 10.7 1700.00 93.66 N 134.09 E 15.3 1800.00 117.41 N 164.06 E 22.4 1.66 2.61 3 .51 4 .56 7.10 1981.68 1946.3 2099.60 2046.3 2221.25 2146.3 2345.64 2246.3 2471.36 2346.3 1900.00 152.16 N 203.19 E 35.3 2000.00 193.57 N 249.97 E 53.3 2100.00 239.71 N 301.61 E 74.9 2200.00 291.13 N 354.75 E 99.3 2300.00 344.29 N 409.32 E 125.0 12.95 17.93 21.65 24.39 25.72 2601.10 2446.3 2736.27 2546.3 2878.97 2646.3 3031.11 2746.3 3188.82 2846.3 2400.00 402.41 N 468.08 E 154.8 2500.00 469.20 N 529.73 E 189.9 2600.00 542.19 N 600.62 E 232.6 2700.00 622.27 N 682.64 E 284.8 2800.00 708.97 N 768.35 E 342.5 29.74 35.17 42.70 52.13 57.71 3359.36 2946.3 3538.98 3046.3 3729.65 3146.3 3924.05 3246.3 4113.19 3346.3 2900.00 808.93 N 863.64 E 413.0 3000.00 916.76 N 966.73 E 492.6 3100.00 1032.02 N 1081.04 E 583.3 3200.00 1146.29 N 1202.39 E 677.7 3300.00 1255.24 N 1320.21 E 766.8 70.54 79.62 90.67 94.39 89.14 St -SUN DRILLING SERVICES ANCHORAGE ALASKA PAGE ARCO ALASKA INC Point McIntyre / P2-19 500292276500 NORTH SLOPE BOROUGH COMPUTATION DATE: 6/10/97 DATE OF SURVEY: 051997 JOB NI/MBER: AK-MM-70131 KELLY BUSHING ELEV. = 46.30 FT. OPERATOR: ARCO ALASKA INC INTERPOLATED VALUES FOR EVEN 100 FEET OF SUB-SEA DEPTH TRUE SUB-SEA MEASD VERTICAL VERTICAL DEPTH DEPTH DEPTH TOTAL RECTANGULAR COORDINATES NORTH/SOUTH EAST/WEST MD-TVD VERTICAL DIFFERENCE CORRECTION 4283.76 3446.30 3400.00 4445.08 3546.30 3500.00 4610.80 3646.30 3600.00 4784.32 3746.30 3700.00 4963.68 3846.30 3800.00 1354.15 N 1416.66 1445.58 N 1504.19 1541.24 N 1595.29 1645.95 N 1690.89 1754.73 N 1792.54 837.46 70.58 898.78 61.32 964.50 65.71 1038.02 73.52 1117.38 79.37 5151.00 3946.30 3900.00 5343.11 4046.30 4000.00 5533.36 4146.30 4100.00 5720.29 4246.30 4200.00 5901.72 4346.30 4300.00 1867.21 N 1904.00 1984.39 N 2018.79 2100.24 N 2131.80 2213.68 N 2241.68 2321.56 N 2347.84 E 1204.70 87.31 E 1296.81 92.11 E 1387.06 90.25 E 1473.99 86.93 E 1555.42 81.43 6075.85 4446.30 4400.00 6254.83 4546.30 4500.00 6441.03 4646.30 4600.00 6624.79 4746.30 4700.00 6809.27 4846.30 4800.00 2426.59 N 2444.18 2541.62 N 2537.95 2667.03 N 2632.50 2793.70 N 2720.27 2927.21 N 2799.04 E 1629.55 74.14 E 1708.53 78.97 E 1794.73 86.20 E 1878.49 83.77 E 1962.97 84.48 6993.84 4946.30 4900.00 7172.97 5046.30 5000.00 7351.86 5146.30 5100.00 7535.48 5246.30 5200.00 7724.68 5346.30 5300.00 3060.38 N 2878.58 3188.40 N 2954.08 3313.16 N 3034.26 3442.23 N 3118.24 3576.16 N 3206.87 E 2047.54 84.56 E 2126.67 79.14 E 2205.56 78.89 E 2289.18 83.62 E 2378.38 89.20 7916.52 5446.30 5400.00 8109.79 5546.30 5500.00 8299.81 5646.30 5600.00 8489.17 5746.30 5700.00 8678.20 5846.30 5800.00 3714.22 N 3294.85 3853.65 N 3383.81 3989.95 N 3470.56 4125.61 N 3556.90 4261.37 N 3642.35 E 2470.22 91.84 E 2563.50 93.28 E 2653.51 90.01 E 2742.87 89.36 E 2831.90 89.03 8865.39 5946.30 5900.00 9051.85 6046.30 6000.00 9241.02 6146.30 6100.00 9430.20 6246.30 6200.00 9618.07 6346.30 6300.00 4394.31 N 3728.14 4521.78 N 3820.38 4650.61 N 3916.25 4781.25 N 4009.61 4911.86 N 4100.34 E 2919.09 87.19 E 3005.55 86.46 E 3094.72 89.17 E 3183.90 89.18 E 3271.77 87.86 9813.28 6446.30 6400.00 10001.24 6546.30 6500.00 10184.08 6646.30 6600.00 10371.90 6746.30 6700.00 10560.99 6846.30 6800.00 5051.47 N 4193.14 5184.40 N 4280.59 5314.49 N 4361.23 5450.32 N 4443.87 5587.36 N 4527.35 E 3366.98 95.21 E 3454.94 87.97 E 3537.78 82.84 E 3625.60 87.83 E 3714.69 89.09 S~ -SUN DRILLING SERVICES ANCHORAGE ALASKA PAGE ARCO ALASKA INC Point McIntyre / P2-19 500292276500 NORTH SLOPE BOROUGH COMPUTATION DATE: 6/10/97 DATE OF SURVEY: 051997 JOB NUMBER: AK-MM-70131 KELLY BUSHING ELEV. = 46.30 FT. OPERATOR: ARCO ALASKA INC INTERPOLATED VALUES FOR EVEN 100 FEET OF SUB-SEA DEPTH TRUE SUB-SEA TOTAL MEASD VERTICAL VERTICAL RECTANGULAR COORDINATES MD-TVD DEPTH DEPTH DEPTH NORTH/SOUTH EAST/WEST DIFFERENCE VERTICAL CORRECTION 10744.90 6946.30 6900.00 5716.54 N 4611.81 E 3798.60 10927.91 7046.30 7000.00 5844.77 N 4695.76 E 3881.61 11113.00 7146.30 7100.00 5975.56 N 4780.32 E 3966.70 11292.33 7246.30 7200.00 6101.37 N 4859.82 E 4046.03 11467.89 7346.30 7300.00 6223.79 N 4936.20 E 4121.59 83.91 83.01 85.09 79.32 75.56 11647.75 7446.30 7400.00 6350.16 N 5016.06 E 4201.45 11829.00 7546.30 7500.00 6476.94 N 5098.38 E 4282.70 12014.20 7646.30 7600.00 6606.02 N 5185.76 E 4367.90 12205.82 7746.30 7700.00 6742.63 N 5275.50 E 4459.52 12395.01 7846.30 7800.00 6876.94 N 5363.53 E 4548.71 79.86 81.25 85.20 91.62 89.19 12578.83 7946.30 7900.00 7006.17 N 5447.72 E 4632.53 12758.35 8046.30 8000.00 7132.30 N 5527.20 E 4712.05 12941.04 8146.30 8100.00 7260.27 N 5610.85 E 4794.74 13129.23 8246.30 8200.00 7394.83 N 5696.33 E 4882.93 13311.46 8346.30 8300.00 7524.08 N 5776.94 E 4965.16 83.81 79.53 82.69 88.19 82.23 13491.05 8446.30 8400.00 7650.99 N 5855.31 E 5044.75 13674.26 8546.30 8500.00 7780.78 N 5937.28 E 5127.96 13854.36 8646.30 8600.00 7907.79 N 6016.64 E 5208.06 14032.68 8746.30 8700.00 8034.64 N 6092.14 E 5286.38 14203.71 8846.30 8800.00 8154.03 N 6162.80 E 5357.41 79.59 83.21 80.10 78.32 71.03 14368.94 8946.30 8900.00 8267.68 N 6229.01 E 5422.64 14530.80 9046.30 9000.00 8378.02 N 6292.43 E 5484.50 14694.22 9146.30 9100.00 8490.51 N 6356.07 E 5547.92 14860.83 9246.30 9200.00 8607.00 N 6420.80 E 5614.53 15032.54 9346.30 9300.00 8729.04 N 6488.51 E 5686.24 65.23 61.86 63.42 66.62 71.71 15208.58 9446.30 9400.00 8856.97 N 6556.51 E 5762.28 15380.07 9546.30 9500.00 8980.09 N 6621.69 E 5833.77 15512.00 9624.88 9578.58 9074.24 N 6670.32 E 5887.12 76.04 71.49 53.35 THE CALCULATION PROCEDURES USE A LINEAR INTERPOLATION BETWEEN THE NEAREST 20 FOOT MD (FROM MINIMUM CURVATURE) POINTS MP¥ g3 '9? li:4?RM BP EZPLORRTIOM BP EXPLORATION PO Box 196612 Anchorage, Ala$1{~ 9g$19-6612 TELECOPY COMMUNICATIONS CENTER MESSAGE# TO: Name: Company: Location: Fax # con,rm # FROM: Name & Ext.: .. -_- --~ -- -___-_ .--_--__~--~ ~__ ~ _ _--__- ~_--__--_~ %_~ - Department':=_ ,~'~ ........ MailStop: _~_~_,~L~_~__-_-_-- NOTES: PAGES TO FOLLOW ....... (Do Not Include Cover Sheet) .... , 2 5 19,9~7 · PRIVATE Telecopy # Confirm # SECRET CONFIDENTIAL' :2 .... ~.r..%y="~"~-f. .... ~_=:.~'::.-~.._~--~---:-~--..--"-' ~-~-: .... ~ ~ --~Z-:-='' - For Communications Ce.ret Use Only ,Time In lime Sent Time Confirmed Confirmed By Operator MNY WW 'W'F ll:~WNM WW LMULURHIIOPt -~ ~./ 6S-S00 (.,5.S017,HOLE PUNCHED A)C I,q E~ammd ~. 11:48RM BP FvpLORRTIOM 6.g.800 6.~-It01 7-HOL~ PUN:H~D GeoQuest 500 W. International Airport Road Anchorage, AK 99518-1199 ATTN: Sherrie NO. 11520 Company: Field: Alaska Oil & Gas Cons Corem Attn: Lori Taylor 3001 Porcupine Drive Anchorage, AK 99501 Greater Point Mclntyre Area 11/3/97 Floppy Well Job # Log Description Date BL RF Sepia Disk P1-01 ~t C..-- INJECTION PROFILE 970925 I 1 P1-01 ~ INJECTION PROFILE 97091 3 1 1 ,, P 1-6 · q ~p, i~""1 PRODUCTION PROFILE 9 71 003 I 1 P 1-11. PRODUCTION PROFILE W/DEFT 971 01 2 I 1 ,,, P 1-12 ° PRODUCTION PROFILE W/DEFT 970811 I I ,,, P 1 - 14 . ~ t ~ INJECTION PROFILE 97 092 6 I 1 P 1- 21 Lk ! (..~ INJECTION PROFILE 97 0926 1 1 P2-01, c~'1' O'-['~ PRODUCTION PROFILE 97091 4 I 1 P 2-16 L~ [C- INJECTION PROFILE 970 801 I 1 P 2-1 8 ~ PRODUCTION PROFILE W/DEFT 970 92 7 I 1 P2-19 · q'-j 'O'-~ PRODUCTION PROFILE DEI=i'IMAGES 971 004 I 1 P2-19 · ~ PRODUCTION PROFILE 971 004 I 1 P2-28 I~,tC- INJECTION PROFILE 971 01 0 I 1 P 2-31 · PRODUCTION LOG 97 080 4 1 1 ~ P2-50 · DEFT IMAGES 971 005 I 1 P 2- 50 · PRODUCTION PROFILE 971 00 5 I 1 P 2- 54, PRODUCTION PROFILE 97 081 9 I 1 P 2-57, PRODUCTION PROFILE 970911 I 1 P2'58' ( ~ PRODUCTION PROFILE W/DEFT 971010 I I ,' t%'"/ ~'o1~ 3'05' ~-o~ ~ .oq~ ~.o~ SIGNED' DATE: Alasi(a Oit & Gas Cons. Cor~lff~o~ Please sign and return one copy of this transmittal to Sherrie at the above address, Thank you, Anchorage sper, r, -sun C]I::! I I--I-- I I~] CS S ~ I::1 I,/! r" ~::: S To: WELL LOG TRANSMllWAL State of Alaska Alaska Oil and Gas Conservation Comm. Attn.: Lori Taylor 3001 Porcupine Dr. Anchorage, Alaska 99501 MWD Formation Evaluation Logs P2-19, AK-NflM-70131 July 31,1997 The technical data listed below is being submitted herewith. Please address any problems or concerns to the attention of.' )"tm Galvin, Sperry-Sun Drilling Services, 5631 Silverado Way, #G, Anchorage, AK 99518 P2-19: 2" x 5" MD Resistivity & Gamma Ray Logs: 50-029-22765-00 2"x 5" TVD Resistivity & Gamma Ray Logs: 50-029-22765-00 2"x 5" MD Neutron & Density Logs: 50-029-22765-00 2" x 5" TVD Neutron & Density Logs: 50-029-22765-00 1 Blueline 1 Folded Sepia 1 Blueline 1 Folded Sepia 1 Blueline 1 Folded Sepia 1 Blueline 1 Folded Sepia 563! Silverado Way, Suite G · Anchorage, AJaska 99518 · (907) 563-3256 ° Fax (907) 563-7252 A Dresser Industries, inc. Company -- 0 I~! ! I.__/! I~ r~- WELL LOG TRANSMITTAL To: State of Alaska July 31, 1997 Alaska Oil and Gas Conservation Comm. Attn.: Lori Taylor 3001 Porcupine Drive. Anchorage, Alaska 99501 MWD Formation Evaluation Logs - P2-19, AK-MM-70131 The technical data listed below is being submitted herewith. Please acknowledge receipt by returning a signed copy of this transmittal letter to the attention of~ Tun Galvin, Sperry-Sun Drilling Services, 5631 Silverado Way, ~, Anchorage, AK 99518 1 LDWG formatted LIS tape with verification listing. API#: 50-029-22765-00 5631 Silverado Way, Suite G · Anchorage, AJaska 99518 · (9.07) 563-3256 ° Fax (907) 563-7252 A Dresser Industries, Inc. Company GeoQuest 500 W. International Airport Road Anchorage, AK 99518-1199 ATTN: Sherrie NO. 11200 Company: Field: Alaska Oil & Gas Cons Comm Attn' Lori Taylor 3001 Porcupine Drive Anchorage, AK 99501 Greater Point Mclntyre Area All Lisburne Wells (Incl NK-25 &NKk26) 7/31/97 Floppy Well Job # Log Description Date BL RF Sepia Disk P2-,!9 C~'7. ©'7c~ 97330 CBT/GR(PDC) ~ '~(.3,~/ 970614 1 " ,, .... ......... I ....... _, Please sign and return one copy of this transmittal to Sherrie at the above address. Thank you. GeoQuest 500 W. International Airport Road Anchorage, AK 99518-1199 ATTN: Sherrie NO. 11352 Company: Alaska Oil & Gas Cons Comm Attn: Lori Taylor 3001 Porcupine Drive Anchorage, AK 99501 Field: Point Mclntyre 7/21/98 Floppy Well Job # Log Description Date BL RF Sepia Disk 'p1.17 ~;t'~. o,~-..-~ PRODUCTiON LOG 980701 I 1 P 1-17 ',~ DIGITAL FLOW ENTRY LOG 9 S 0701 I 1 P 1-20 ~ ~ ~ ~ PRODUCTiON PROFILE 980421 1 1 P 1-23 ~(~- i ~ ~1 PRODUCTiON PROFILE 980526 I 1 P1-23 ~,- DEFT LOG 980526 I 1 PM 2-09 ~ ©L~ C~ CEMENT EVALUATION LOG 980611 I 1 P2-10 ~, ~%~ RFT 980523 I 1 P2-10 .~--' CEMENT EVALUATION LOG 98061 7 I 1 P2-19 ~. o~ CEMENT EVALUATION LOG 980414 I 1 P2-37 ~'~ - ~c5c.~ PRODUCTiON PROFILE 980504 I 1 P2-37 ~ DEFT LOG 980 504 I 1 P2-44 C~, C.~.o'~ CEMENT EVALUATION LOG 98041 3 I 1 P2-44 { PRODUCTION PRORLE 98041 5 I 1 P2-44~ PRODUCTiON PROFILE W/DEFT 98061 5 I 1 P2-45A ~'~1- I~ PRODUCTiON PROFILE 980423 I 1 P2-45A ~ DEFT LOG 980423 SIGNED: DATE: Please sign and return one copy of this transmittal to Sherrie at the above address. Thank you. GeoQuest 500 W. International Airport Road Anchorage, AK 99518-1199 ATTN' Sherrie NO. 11122 Company: Field: Alaska Oil & Gas Cons Comm Attn: Lori Taylor 3001 Porcupine Drive Anchorage, AK 99501 Greater Point Mclntyre Area Excluding P1-09 7/3/97 Well Job # Log Description Date BL Floppy RF Sepia Disk P1-24 · GAS LIFT SURVEY 970522 I 1 ~P2-03 , CBL 970404 I 1 P2-19 · CBL 970614 I 1 P2-19 . CET 970614 1 1 P2-30 - PRODUCTION PROFILE 970 501 I 1 P2-42 Lx, t C_. WATER INJECTION PROFILE 970506 I 1 2-49 - PRODUCTION PROFILE 97 061 2 I I SIGNED' Please sign and return one copy of this transmittal to Sherrie at the above address. Thank you. DATE: ,,It, fi 0 ;'4 1997 CI I~! I I_1_ I N 13 S E !:1~./I r" ~ S AOGCC Lori Taylor 3001 Porcupine Drive Anchorage, AK 99501 Re: Distribution of Survey Data P2-19 June 11, 1997 Dear Ms. Taylor: Enclosed are two hard copies of the above mentioned file(s). Well P2-19 MWD survey Tie-In point at 0.00', and a Projected survey at 15,512.00'. Please call me at 563-3256 if you have any questions or concerns. Regards, William T. Allen Survey Manager Attachments 4Ja~'a ,.'..ti &" · .... 5631 Silverado Way, Suite G · Anchorage, Alaska 99518 · (9.07) 563-3256 · Fax (907) 563-7252 A Dresser Industries, Inc. Company Transmittal State of Alaska Alaska Oil & Gas Conservation Comm. Atten: Lori Taylor 3001 Porcupine Drive Anchorage, AK 99501 of Final Prints. Please sign and return coCiy"tO:" Western Aitas Logging Services Pouch 340013 Prudhoe Bay, AK 99734-0013 iWell Name P2- 19 P2- 19 IServices MAC/GR ~MAC/GR Bluelines ISepia I I I Film ceived by: i3 ~ska 0ii z ~-'--,:~ ",-:','~ .... ,;~,,.;s:¢'--- Date Contact Rebecca Lange if you have a question concerning this transmittal at (907) 659-2816 or Fax (907) 659-2602. TONY KNOWLE$, GOVERNOR ALASK& OIL AND GAS CONSERVATION COMMISSION 3001 PORCUPINE DRIVE ANCHORAGE, ALASKA 99501-3192 PHONE: (907) 279-1433 FAX: (907) 276-7542 May 5, 1997 Steve Schultz Senior Drilling Engineer ARCO Alaska Inc. P O Box 196612 Anchorage, AK 99519-6612 Re: Point Mclntyre P2-19 ARCO Alaska, Inc. Permit No: 97-79 Sur. Loc.: 5236'NSL, 4054'WEL, Sec. 14, T12N, R14E, UM Btmhole Loc: 3889'NSL, 2501 'WEL, Sec. 1, T12N, R14E, UM Dear Mr. Schultz: Enclosed is the approved application for permit to drill the above referenced well. The permit to drill does not exempt you from obtaining additional permits required by law from other governmental agencies, and does not authorize conducting drilling operations until all other required permitting determinations are made. Blowout prevention equipment (BOPE) must be tested in accordance with 20 AAC 25.035. Sufficient notice (approximately 24 hours) of the BOPE test performed before drilling below the surface casing shoe must be given so that a representative of the Commission may witness the test. Notice may be given by contacting the Commission petroleum field inspector on the North ' Chairman-'X,,..~ ~ BY ORDER OF THE COMMISSION dlffenclosures CC~ Department of Fish & Game, Habitat Section w/o encl. Department of Envinornment Conservation w/o encl. STATE OF ALASKA ALASK/"- "IL AND GAS CONSERVATION CC' AISSION PERMIT TO DRILL 20 AAC 25.005 la. Type ofwork [] Drill [] Redrill Ilb. Type of well [] Exploratory •Stratigraphic Test [] Development Oil: [] Re-Entry [] DeepenI [] Service [] Development Gas [] Single Zone [] Multiple Zone 2. Name of Operator /r~ o ~,,t~; 5. Datum Elevation (D,F or KB) 10. Field and Pool ~,~ ................... _._;_.:. .... r~..,_~__~.o,,,~ ,,~.._. ' Plan RTE = 46 Point Mclntyre 3. Address 6. Property Designation P.O. Box 196612, Anchorage, Alaska 99519-6612 ADL 365548 4. Location of well at surface 7. Unit or Property Name 11. Type Bond (See 20 AAC 25.025) 5236' NSL, 4054' WEL, SEC. 14, T12N, R14E Point Mclntyre ~_.¢/__~'~O ~,/~__..) At top of productive interval 8. Well Number Number 2~Sj* ~,,~,~,.,.~-.r~,.~ 2924' NSL, 3123' WEL, SEC. 1, T12N, R14E P2-19 .-~-, At total depth 9. Approximate spud date Amount $200,000.00 3889' NSL, 2501' WEL, SEC. 1, T12N, R14E 05/06/97 12. Distance to nearest property line113. Distance to nearest well 14. Number of acres in property 15. Proposed depth (MD and TVD) ADL 377054, 1391'I P2-18, 14' at 500' MD 2560 15720' M D / 9732' TVD 16. To be completed for deviated wells 17. Anticipated pressure {see 20 AAC 25.035 (e) (2)} Kick Off Depth 600' Maximum Hole Anqle 56.75° Maximum surface 3520 psig, At total depth (TVD) 8800' / 4400 psig 18. Casing Program Specifications Setting Depth Size Top Bottom Quantity of Cement Hole Casing Weight Grade Coupling Length MD TVD MD TVD (include stage data) .... 30" 20" 133# H-40 Btc 80' 45' 45' 125' 125' Driven 12-1/4" 9-5/8" 40# L-80 Btc-Mod 6952' 44' 44' 6996' 4947' 1860 sx Coldset II1,602 sx 'G' 8-1/2" 7" 26# L-80 Btcm/NSCC 13927' 43' 43' 14000' 8794' 418 sx Class 'G' 8-1/2" 7" 29# 13CR .i Btcm/NSCC 1720' 14000' 8794' 15720' 9732' 19. To be completed for Redrill, Re-entry, and Deepen Operations. Present well condition summary Total depth: measured feet Plugs (measured) true vertical feet Effective depth: measured feet Junk (measured) true vertical feet Casing Length Size Cemented M D TVD Structural Conductor Surface Intermediate Production Liner APR 28 1997 ' GINAL Perforation depth: truemeasuredvertical 0RI 20. Attachments [] Filing Fee [] Property Plat [] BOP Sketch [] Diverter Sketch [] Drilling Program [] Drilling Fluid Program []Time vs Depth Pict [] Refraction Analysis [] Seabed Report [] 20 AAC 25.050 Requirements Contact Engineer Name/Number: Greg Hobbs, 564-4191 Prepared By Name/Number: Kathy Campoamor, 564-5122 21. I hereby certify that the :~ ego~ng ~s ~u an c.orrect to the best of my knowledge Signed ' ' ~t~v¢ ShCtz i. /~ Title Senior Drilling Engineer Date Commission Use Only Permit Number I APl Number I Approval Date I See cover letter ¢ P '" 7 ¢I 50- 4:~ ~ ~' -' ~ .2_ ~°~"'"~'-t -.-~--%..~ - ~' '~I for other requirements Conditions of Approval: Samples Required [] Yes~ No Mud Log Required [] Ye,~ .No Hydrogen Sulfide Measures '-~Yes [] No Directional Survey Requi'red .~ Yes [] No [] [] [] [] [] -- Required Workina Pressure for BOPE 2M; 3M; ~,. 5M; by olro0~;of 15M Approved By Other: ~Jrlginal 5~g~-:. .... :.~ ,~, ,,.~,~,,.+~,,.. Commissioner the commission Date ,~'-~ . Form 10-401 Rev. 12-01-85 ui:tvlu R Submit In Triplicate I Well Name: I P2-19 [ I Type of Well (producer or injector): [Producer Surface Location: 5236' FSL, 4054' FEL, SEC 14, T12N, R14E Target Location: 2924' FSL, 3123' FEL, SEC 01, T12N, R14E Bottom Hole Location: 3889' FSL, 2501' FEL, SEC 01, T12N, R14E I AFE Number: [ 2B0208 ]Estimated Start Date: 14/22/97 I I Rig: I DOYON 14 ]Days to complete ]28 IuD: 115720, I I TVD: 19732' brt I IRTE: 145.4 I IWell Design (conventional, slimhole, etc.): Formation Markers: ] Ultra-Slimhole 7" Longstring Formation Tops MD TVD(rkb) Base of Permafrost 1808 1782 SV1 (T3) 6611 4737 9 5/8" Casing Point 6994 4947 9-5/8" csg shoe below SV1 & above K-15 K15 (Ugnu) 7431 5187 West Sak 10896 7087 9.5 ppg minimum mud weight required K-10 14237 8919 HRZ 14301 8954 K-5/HRZ same depth, 10.0 ppg Min EMW Kalubik 14334 8972 Kupamk 14346 8979 10.0 ppg Min EMW OWC 14596 9116 Miluveach 15173 9432 TD 15720 9732 7" casing shoe. 300' TVD below Kup. Casing/Tubing Program: Hole ~ize C~g/Tb~ Wt/Ft Grade Conn Length Top Btm O.D. MD/TVD MD/TVD 30" 20" 133# H40 BTC 80' 45/45' 125'/125' 12 1/4" 9 5/8" 40# L-80 BTC-Mod 6952' 44/44' 6996'/4947' 8 1/2" 7" 26# L-80/ BTCM / NSCC 13957' 43/43' 14000'/8794' 29# 13CR 1720' 14000'/8794' 15720'/9732' Tubing 4 1/2" 12.6g 13CR80 NSCT 14183' 42'/42' 14250'/8925' Mud Program: Surface Mud Properties: Spud Density (ppg) ~unnel Vis I Yield Point 8.7-9.5 / 100-300] 30-70 [ 12 1/4" hole section 10secgel [10mingel . 20-60 I 40-80 pH ]Fluid Loss 9-10 15 - 25cc Production Mud Properties: LSND I 8 1/2" hole section Density (ppg) I Plastic Vis Yield Point 10 sec gel 10 min gel 8.8-10.0[ 8-15 20-30 5-15 < 30 pH 9.0-9.5 Fluid Loss 6-12cc Production Mud Properties: 3% KCL I 8-1/2" hole section Density (ppg) 10.0- 10.3 I Plastic Vis 8-15 Yield Point ] 10 sec gel 25-3O ] 12-15 10 min gel ] < 30 I . pH [Fluid Loss 9.0-9.5I 4-6cc Cement Data: Casing First Stage: Second Stage: Comments Sxs/Wt/Yield Sxs/Wt/Yield 9-5/8" surface Coldset III: 979/12.2/1.92 Two stage job: casing 881/12.2/1.92 (assumes 200% First stage Coldset III lead to 6994' MD. excess in permafrost) from 2000'-5600' @ 50% ES cementer Class G: excess followed by Class G @ at 2000' 602/15.8/1.15 tail from shoe to 5600' (750' MD. TVD) @ 50% excess + 80' shoe. Second stage Coldset III circulated to surface. **************************************************************************** Casing/Liner Lead:Sxs/Wt/Yield Tail: Sxs/Wt/Yield Comments 7" none 418/15.8/1.14 Class "G". Volume based on cement to 1000' above the Kuparuk with 50% excess + 80' shoe. Logging Program: Open Hole Logs: Cased Hole Logs: 12 1/4" MWD Directional only 8 1/2" MWD DIR/GR to 13800' MD 8-1/2" LWD DIR/GR/RES/DEN/NEUT No Openhole Logs GR/CBT/Sonic Well Control: Well control equipment consisting of 5000 psi W.P. pipe rams, blind rams, and annular preventer will be installed and is capable of handling maximum potential surface pressures. BOPE and drilling fluid system schematics on file with AOGCC. Waiver for Diverter System requested from State (dated 4/14/97). Directional: KOP: 600' MD Maximum Hole Angle: Close Approach Wells: 56.75 degrees P2-18 (danger interval at 500'MD) (14') P2-20 (danger interval at 500' MD) (17') P2-21 (danger interval at 1000' MD)(27') Drifting and Completion Scope 1. 2. 3. 4. 5. 6. 7. 8. 8. 9. 10. Move rig to P2-19. NU riser, diverter, and flowlines. Directionally drill 12 1/4" surface hole to -7000' MD. Run and cement 9 5/8" casing. Cement to surface. Drill 8-1/2" production hole with LWD DIR/GR to 13800' MD. Change over mud system to 3% KCL. Drill 8-1/2" production hole with LWD DIR/GR/RES/DEN/NEU to TD at 15707' MD. Run and cement 7" L-80/13CR casing. Run Wireline Sonic Log and possibly CBT to TD. Run 4-1/2" 13CR production tubing with 7"x4-1/2" packer, 4-1/2" SSSV, and 4-1/2"xl" GLMs. Secure well, RDMO. Production may choose to run the CBT post rig-move. Drilling Hazards/Contingencies · The original reservoir pressure is 4350 psi at 8800' ss. The expected reservoir pressure is 4400 psi at 8800' ss. Nearby well P2-15 experienced a 15 bbl pit gain (shallow gas) at 7938'MD. There was a 15 bbl pit gain, but no flow was noted. · Tight surface hole was found in well P2-49 from 3225'-3393'. The pipe stuck at four points but was worked loose without event. · Tight hole has been experienced in the lower Sagavanirktok, below the surface casing shoe which were set into the SV4 sand. This has caused stuck pipe incidents and bit/BHA balling Gumbo problems. · Coal stringers in the lower Ugnu have caused stuck pipe. · No major instances of lost circulation problems have occured on Pt Mac 2 wells. · If formation problems occur above the Kupamk Interval, 7" casing will top-set the Kuparuk, and the pay will be drilled out with 6" hole and completed with a 4.5" liner. The Miluveach shale will be penetrated and could cause problems with sloughing during drilling or running the casing. Mud will be weighted up in anticipation of the shale. Centralizers will not be clamped down in the lower section of the casing to prevent their hanging up on any ledges. Disposal · Cuttings Handling: Cuttings should be hauled to the ball mill at CC-2A. Fluid Handling: Haul all drilling and completion fluids and other Class II wastes to CC-2A for injection. Haul all Class I wastes to Pad 3 for disposal. In addition, haul all cuttings from drilling operations to CC-2A for disposal, except any metal cuttings which will be sent to the North Slope Borough. GH 4/10/97 Shared Services Drilling Strucfure' Pt Mac 2 Well ' P2-19 Field ' Poinl Mac Location ' Alaska TARGET DATA 14546 56.75 52.72 ~79 8257 ,6195 TAP, GE-/ 687460, 6006956 A I! o o ScQle 1 ' 800.00 -800 0 800 WELL DATA I -- s,o,/prop .... slot .... well .... wellpath -- p264 P2-19 P2- ! 9 P2-19 [WpS] Easf = > 1600 2400 5200 4000 4800 5 APPROVED: ~ . ////¢.,,~ 600 6400 7/2'0~ 8000 9600I 88O( 7200 6400 5600 4800 5200- 24OO- 1600- _ 800 -- 0 -- -800 I I . i [ i i I I I I I I q- ! ! 1 I I I I , I I I 9600 8800 8OOO 7200 6400 , , 71 4800 I I I I I ............. 4000 O I I I I I/ .......................................................... ~ ................................. 3200 ~7' I I · I I ~ I I I I i I ~ $/8 $~'c~e I I I I ~// I I I I I I I I I //I I I I I I I I I I [ / I I I I I I I I I/ ~t,~l I I I I I I I VI ----I II I I I ......... r ........ ~ .......~ ........ ~- .... -~:=' ........ r ........~ ....... -,- ....... ~ ................. 2400 I I I I I I I I I I I I I I I I I I I 1°~) I I I I I i I i i i I I I I I I I I I I ......... r ........ r ....... ~ ....... 4 ........ { ........ ~ ........ r ........ ~ ........ ................. 1600 I I / I -~,~ I I I I I I I I I I I I I I I [ I I I I I I I I I I I ......... ' ........ ~ ....~J--------J ................ [ ........ ' ................................... 800 i ~, i i i /il i I I I I I i I I I I I I I i I I I I I I I ......... Lc'___ ~_'_ ~ ..... J ....... J .................. I_ ............................................ 0 co I I I I I I I I [ I I I I I I I I I I I I . -800 -800 0 800 1600 2400 3200 4000 4800 5600 6400 7200 8000 Shared Services Drilling Sfruciure · Pt Mac 2 Well · P2-19 Field ' Point Mac Location · Alaska WELL PROFILE DATA .... Point ....MO Inc Oir TVD North EastBLS (deg/lOOft) Surface Location 0 O.OO 0.00 0 0 0 0.00 5tort DJr 1/100500 0.00 50.00 500 0 0 0.00 Start Dir 1.5/1 O0 800 5.00 50.00 800 5 6 1,00 Start Oir 2/1 O0 1200 9.00 50.00 1197 32 38 1.50 Start Dir 2.5/1 O0 1500 15.00 50.00 1491 72 86 2.00 End Oir 1800 22.50 50,00 1775 154 160 2.50 Start Oir 2.5/1 O0 1882 22.50 50.00 1850 154 184 O.OO End Dir 3256 56.68 44.00 2894 754 802 2.50 Start Oir 2.5/I O0 6000 56.68 44.00 4401 2404 25950.00 End Dir 6377 56.75 52.72 4609 2650 25902.50 Kuparuk (lar§et) 14346 56.75 32.72 8979 8257 61930.00 WOC 14596 56.75 32.72 9116 84-33 63060.00 Miluveach 15173 56.75 52.72 9432 8838 65660.00 ID 15720 56.75 52.72 9752 9Z23 68130.00 WELL DATA -- svy/prop ....slot .... well .... wellpoth -- p264 P2-19 P2-19 P2-19 [WpS] ~ [ SurtoceLocotion X'681462.48 Y:5998537.01 RKB:46.7 CHECKEDj~ APPROVE~ 00 -1000 t' 0 --t- ........ P ..... -.~J,y.~,tK~,~- ~ ........ 4 ........ + ........ * ........ ~ ....... -~- ....... 4 ........ 4 ........ + ................. ~-- I ! I I I I I I I I I I ! / I I I ! I I I I I I · ' [ / I I I I I I I I I I · I I I I I I I I '- -I / ,oo ~' , , ..... , , ] [ B:O~) I I t I I I I I I I i~ / / 8t~,~ ~" I.,~/l O0: ~00 'ED I I I I I I I I -- / / 4.50 I I I I I I I I I I o 1000 ......... f--~.~?---~ ....... ~ ........ ~ ........ · ........ v ........ ~ .......-~ ....... ~ ........ ~ ........ ~ ........ ~ ........ 0 fi "/.o~L ~/ ~n · . I I I I I I I I I II 10.00 ~'t'1"JT~''/lOO:l'"l"O?dO I ..... I ' I t/) ,~ ~.~, [ , , , , , , , , , , -- i\ t . $~o~"t ~i~"£.6/!00 J 1600"~D I I I I I I I I I I ~ 1 ?.~) I I I I I I I I I I I , I ~ ~0,00 ~1~:1800'~ I I I I I I I I I I \ I \ 24.9g--------"-"----1' ....... /'"r ......i i i i I i I i i ......... r --~---zz.z&r ....... '~ ........ -~ ........ T ........ r ........ r ....... T .......q ........ 'T ........ v ........ r ........ (_ 2000 I \ "~.J~L I I I I I I ~% I '4~ I I I I I I ~ "¢5~& i~laj~c:3Z$6,MD I I I I ................................................F~:F,- -~ .t t- ........................................... + ........ t- ........ Q~ 3000 t- ........ I I I I .I I Il -- / I '~I C} 4000 -I- ................. k ........ ,- .... ~ .................. f .............................................................. ! , I ! ! I I I · . , I I I ~-- 5000 -~ ........ . ........ ~- .......J ........ J ........"~'"~- ..... Oz~- '- _~-~-- ~-,-~ k~ '-~ .... ~ ....... . ........ .~ .......................... (D { I I I "~/~'¢~"c'~"~ I~ ~ I ........ t',,~ ', I I ', ', { I I I I I ~ I I I I I I I / I I I I I I I I I I I I I I I I I ~ I I I I I I I I I I I I ~ I I I I I I I I I I I I ~ I I I I I I '~'tw 6000 .......... ~ ........ ~- ....... -~ ........ -~ ........ + ........ + ...... -..-,- ....... -+ ....... -~ ........ ~ ........ + ........ ,- ........ I I I I I I ~ I I I I I I I I I I t I~ I I I I I I I I I I I I ~ I I I I I _ [ I I I I I I ~ I I I I I ~ I I I I I I I ~ I I I I ! I I I I I I I ~1 I I I I I I I I I I I ~ I I I I r~ 7000 , I , I I ! , ,~ ! ! I ! .......... r ........ r ....... ~ .......-~--------------T ........ V-- ..... r .......'-~--"~ .... ~ - -~r--~ 'D~F~ .... v ........ r ........ I ~ I '~F I I i I ~, .... ~! I I I -- ~ I I I ~ ! I I I I I I I ' Il ~ I I I V 8000 .......................................................................... ' 4' ...... ~.~' ........ ,' ........ ~' ........ i I I I -- I [ I I I I I I KAro: I Z: 14301'MD 9 0 0 0 ............................. ~ ,, -.~ 0000 .......... ~- ........ ~- ................ ' ........ * ........ ' ................ .4_ ....... -~ ........ a ........ ~ ...............?'~,-=~L oau~on I I I I - I I I I -- I I 13 ooo I I [ I [ I [ I I I I I i I [ I ] I [ I ] I I I i -1000 0 1000 2000 3060 4000 5000 6000 7000 8000 9000 10000 11000 12000 ~oole 1 ' 1000.00 v.di¢o]seo, .... 56.87ozimufhwifhref ...... O.OON, O.OOEfromP2-19 P2-19 [Wp5] Vertical Section 36.87 RKB 46.70 MD Inc. Azl. 0.00 0.00 0.00 100.00 0.00 50.00 200.00 0.00 50.00 300.00 0.00 50.00 400.00 0.00 50.00 500.00 0.00 50.00 600.00 1.00 50.00 700.00 2.00 50.00 800.00 3.00 50.00 900.00 4.50 50.00 1000.00 6.00 50.00 1100.00 7.50 50.00 1200.00 9.00 50.00 1250.00 10.00 50.00 1350.00 12.00 50.00 1450.00 14.00 50.00 1500.00 15.00 50.00 1600.00 17.50 50.00 1700.00 20.00 50.00 1800.00 22.50 50.00 1807.60 22.50 50.00 1881.53 22.50 50.00 1900.00 22.96 49.82 2000.00 25.43 48.93 2100.00 27.91 48.20 2200.00 30.39 47.57 2300.00 32.87 47.03 2400.00 35.36 46.56 2500.00 37.85 46.14 2600.00 40.34 45.77 2700.00 42.83 45.43 2800.00 45.32 45.13 2900.00 47.81 44.85 3000.00 50.30 44.59 3100.00 52.79 44.35 3200.00 55.29 44.12 3248.73 56.50 44.02 3255.86 56.68 44.00 3300.00 56.68 44.00 4/16/97 1 1:53 AM TVDss -46.70 53.30 153.30 253.30 353.30 453.3O 553.29 653.26 753.16 852.95 952.52 1051.83 1150.79 1200.10 1298,26 1395.69 1444.10 1540.10 1634.78 1727.98 1735.00 18O3.3O 1820.34 1911.55 2000.90 2088.23 2173.37 2256.15 2336.42 2414.03 2488.83 2560.67 2629.42 2694.95 2757.13 2815.85 2843.17 2847.10 2871.34 TVDrkb 0.00 100.00 200.00 300.00 400.00 500.00 599.99 699.96 799.86 899.65 999.22 1098.53 1197.49 1246.80 1344.96 1442.39 1490.80 1586.80 1681.48 1774.68 1781.70 1850.00 1867.04 1958.25 2047.60 2134.93 2220.07 2302.85 2383.12 2460.73 2535.53 2607.37 2676.12 2741.65 2803.83 2862.55 2889.87 2893.8O 2918.04 Rect. Coordinates Northing O.OOn O.OOn O.OOn O.OOn O.OOn 0.00n 0.56n 2.24n 5.05n 9.25n 15.13n 22.69n 31.91n 37.22n 49.48n 63.94n 71.99n 89.97n 110.63n 133.93n 135.80n 153.98n 158.58n 185.27n 214.98n 247.65n 283.22n 321.62n 362.77n 406.61n 453.04n 501.98n 553.34n 607.01n 662.89n 720.88n 749.88n 754.16n 780.69n Easting 0.00e 0.00e 0.00e 0.00e 0.00e 0.00e 0.67e 2.67e 6.02e 11.03e 18.03e 27.04e 38.03e 44.35e 58.97e 76,20e 85.79e 107.22e 131.85e 159.61 e 161.84e 183.51 e 188.97e 220.06e 253.70e 289.82e 328.35e 369.23e 412.37e 457.68e 505.10e 554.52e 605.84e 658.98e 713.83e 770.29e 798.35e 802.49e 828.11e Grid Coordinates Easting 681462.48 681462.48 681462.48 681462.48 681462.48 681462.48 681463.14 681465.10 681468.38 681473.29 681480.15 681488.98 681499.75 681505.95 681520.27 681537.16 681546.56 681567.56 681591.69 681618.90 681621.09 681642.32 681647.67 681678.13 681711.06 681746.41 681784.10 681824.06 681866.22 681910.50 681956.81 682005.07 682055.17 682107.04 682160.57 682215.65 682243.02 682247.06 682272.05 Northing 5998537.01 5998537.01 5998537.01 5998537.01 5998537.01 5998537.01 5998537.59 5998539.32 5998542.20 5998546.52 5998552.56 5998560.32 5998569.80 5998575.25 5998587.85 5998602.71 5998610.98 5998629.46 5998650.69 5998674.62 5998676.55 5998695.23 5998699.95 5998727.36 5998757.85 5998791.35 5998827.81 5998867.15 5998909.30 5998954.19 5999001.71 5999051.79 5999104.33 5999159.22 5999216.37 5999275.67 5999305.30 5999309.68 5999336.80 DLS deg/100ft 0.00 0.00 0.00 0.00 0.00 0.00 1.00 1.00 1.00 1.50 1.50 1.50 1.50 2.00 2.00 2.00 2.00 2.50 2.50 2.50 0.00 0.00 2.50 2.50 2.50 2.50 2.50 2.50 2.50 2.50 2.50 2.50 2.50 2.50 2.50 2.50 2.50 2.50 0.00 Page 1 of 5 Vertical Section 0.00 0.00 0.00 0.00 0.00 0.00 0.85 3.40 7.65 14.02 22.93 34.37 48.35 56.38 74.96 96.87 109.06 136.31 167.61 202.91 205.74 233.29 240.24 280.25 324.20 372.01 423.58 478.83 537.64 599.90 665.49 734.29 806.17 881.00 958.61 1038.88 1078.91 1084.82 1121.42 Comment Surface Location Start Dir 1/100: 500'MD Start Dir 1.5/100: 800'MD Start Dir 2/100: 1200'MD Start Dir 2.5/100: 1500'MD End Dir: 1800'MD Base Permafrost: 1808'MD Start Dir 2.5/100: 1882'MD End Dir: 3256'MD P2-19 [Wp5] Vertical Section 36.87 RKB 46.70 MD Inc. Azi. TVDss TVDrkb 3400.00 56.68 44.00 2926.27 2972.97 3500.00 56.68 44.00 2981.21 3027.91 3600.00 56.68 44.00 3036.14 3082.84 3700.00 56.68 44.00 3091.07 3137.77 3800.00 56.68 44.00 3146.00 3192.70 3900.00 56.68 44.00 3200.93 3247.63 4000.00 56.68 44.00 3255.86 3302.56 4100.00 56.68 44.00 3310.79 3357.49 4200.00 56.68 44.00 3365.73 3412.43 4300.00 56.68 44.00 3420.66 3467.36 4400.00 56.68 44.00 3475.59 3522.29 4500.00 56.68 44.00 3530.52 3577.22 4600.00 56.68 44.00 3585.45 3632.15 4700.00 56.68 44.00 3640.38 3687.08 4800.00 56.68 44.00 3695.31 3742.01 4900.00 56.68 44.00 3750.25 3796.95 5000.00 56.68 44.00 3805.18 3851.88 5100.00 56.68 44.00 3860.11 3906.81 5200.00 56.68 44.00 3915.04 3961.74 5300.00 56.68 44.00 3969.97 4016.67 5400.00 56.68 44.00 4024.90 4071.60 5500.00 56.68 44.00 4079.83 4126.53 5600.00 56.68 44.00 4134.77 4181.47 5700.00 56.68 44.00 4189.70 4236.40 5800.00 56.68 44.00 4244.63 4291.33 5900.00 56.68 44.00 4299.56 4346.26 6000.00 56.68 44.00 4354.49 4401.19 6100.00 56.60 41.01 4409.49 4456.19 6200.00 56.59 38.01 4464.56 4511.26 6300.00 56.65 35.02 4519.59 4566.29 6362.02 56.72 33.17 4553.65 4600.35 6376.99 56.75 32.72 4561.87 4608.57 6400.00 56.75 32.72 4574.48 4621.18 6500.00 56.75 32.72 4629.32 4676.02 6600.00 56.75 32.72 4684.16 4730.86 6610.66 56.75 32.72 4690.00 4736.70 6700.00 56.75 32.72 4738.99 4785.69 6800.00 56.75 32.72 4793.83 4840.53 6900.00 56.75 32.72 4848.67 4895.37 4/16/97 1 1:53 AM Rect. Coordinates Northing 840.80n 900.91 n 961.02n 1021.13n 1081.23n 1141.34n 1201.45n 1261.56n 1321.67n 1381.78n 1441.89n 1502.00n 1562.11 n 1622.22n 1682.33n 1742.44n 1802.54n 1862.65n 1922.76n 1982.87n 2042.98n 2103.09n 2163.20n 2223.31 n 2283.42n 2343.53n 2403.64n 2465.20n 2529.59n 2596.69n 2639.61 n 2650.11 n 2666.30n 2736.65n 2807.01 n 2814.50n 2877.36n 2947.72n 3018.07n Easting 886.16e 944.21e 1002.25e 1060.30e 1118.35e 1176.39e 1234.44e 1292.49e 1350.53e 1408.58e 1466.63e 1524.67e 1582.72e 1640.77e 1698.81e 1756.86e 1814.91e 1872.95e 1931.00e 1989.05e 2047.09e 2105.14e 2163.19e 2221.23e 2279.28e 2337.33e 2395.37e 2451.80e 2504.90e 2554.58e 2583.63e 2590.43e 2600.83e 2646.04e 2691.24e 2696.05e 2736.44e 2781.64e 2826.84e Grid Coordinates Easting 682328.67 682385.29 682441.91 682498.53 682555.16 682611.78 682668.40 682725.02 682781.64 682838.26 682894.88 682951.50 683008.12 683064.75 683121.37 683177.99 683234.61 683291.23 683347.85 683404.47 683461.09 683517.71 683574.33 683630.96 683687.58 683744.20 683800.82 683855.78 683907.36 683955.45 683983.49 683990.05 684000.07 684043.61 684087.15 684091.79 684130.69 684174.23 684217.77 No~hing 5999398.25 5999459.69 5999521.14 5999582.59 5999644.03 5999705.48 5999766.93 5999828.37 5999889.82 5999951.27 6000012.71 6000074.16 6000135.60 6000197.05 6000258.50 6000319.94 6000381.39 6000442.84 6000504.28 6000565.73 6000627.18 6000688.62 6000750.07 6000811.51 6000872.96 6000934.41 6000995.85 6001058.72 6001124.33 6001192.56 6001236.15 6001246.81 6001263.23 6001334.62 6001406.01 6001413.61 6001477.40 6001548.78 6001620.17 DLS de~100ff 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 2.50 2.50 2.50 2.50 2.50 0.00 0.00 0.00 0.00 0.00 0.00 0.00 Page 2 of 5 Ve~ical Section 1204.33 1287.25 1370.16 1453.08 1536.00 1618.91 1701.83 1784.74 1867.66 1950.57 2033.49 2116.40 2199.32 2282.23 2365.15 2448.06 2530.98 2613.90 2696.81 2779.73 2862.64 2945.56 3028.47 3111.39 3194.30 3277.22 3360.13 3443.24 3526.61 3610.10 3661.86 3674.35 3693.54 3776.94 3860.35 3869.24 3943,75 4027.16 4110.56 Comment Start Dir 2.5/100: 6000 End Dir: 6377'MD T3 (SVl): 6611'MD P2-19 [Wp5] Ve~ical Section 36.87 RKB 46.70 MD Inc. Azi. TVDss TVDrkb Rect. Coordinates Grid Coordinates DLS Ve~ical No~hing Easting Easting No~hlng de~100ff Section Comment 6993.61 56.75 32.72 4900.00 4946.70 3083.93n 2869.16e 684258.53 6001687.00 0.00 4188.64 9 5/8" CASING: 6994'MD 7000.00 56.75 32.72 4903.50 4950.20 3088.43n 2872.04e 684261.31 6001691.56 0.00 4193.97 7100.00 56.75 32.72 4958.34 5005.04 3158.78n 2917.25e 684304.85 6001762.95 0.00 4277.37 7200.00 56.75 32.72 5013.17 5059.87 3229.13n 2962.45e 684348.39 6001834.33 0.00 4360.78 7300.00 56.75 32.72 5068.01 5114.71 3299.49n 3007.65e 684391.93 6001905.72 0.00 4444.18 7400.00 56.75 32.72 5122.85 5169.55 3369.84n 3052.85e 684435.47 6001977.11 0.00 4527.59 7431.28 56.75 32.72 5140.00 5186.70 3391.85n 3066.99e 684449.09 6001999.44 0.00 4553.68 K-15: 7431'MD 7500.00 56.75 32.72 5177.68 5224.38 3440.20n 3098.05e 684479.01 6002048.50 0.00 4610.99 7600.00 56.75 32.72 5232.52 5279.22 3510.55n 3143.26e 684522.56 6002119.89 0.00 4694.40 7700.00 56.75 32.72 5287.36 5334.06 3580.91n 3188.46e 684566.10 6002191.27 0.00 4777.80 7800.00 56.75 32.72 5342.19 5388.89 3651.26n 3233.66e 684609.64 6002262.66 0.00 4861.21 7900.00 56.75 32.72 5397.03 5443.73 3721.62n 3278.86e 684653.18 6002334.05 0.00 4944.61 8000.00 56.75 32.72 5451.86 5498.56 3791.97n 3324.06e 684696.72 6002405.44 0.00 5028.02 8100.00 56.75 32.72 5506.70 5553.40 3862.33n 3369.26e 684740.26 6002476.83 0.00 5111.42 8200.00 56.75 32.72 5561.54 5608.24 3932.68n 3414.47e 684783.80 6002548.21 0.00 5194.83 8300.00 56.75 32.72 5616.37 5663.07 4003.04n 3459.67e 684827.34 6002619.60 0.00 5278.23 8400.00 56.75 32.72 5671.21 5717.91 4073.39n 3504.87e 684870.88 6002690.99 0.00 5361.63 8500.00 56.75 32.72 5726.05 5772.75 4143.74n 3550.07e 684914.42 6002762.38 0.00 5445.04 8600.00 56.75 32.72 5780.88 5827.58 4214.10n 3595.27e 684957.96 6002833.77 0.00 5528.44 8700.00 56.75 32.72 5835.72 5882.42 4284.45n 3640.48e 685001.51 6002905.15 0.00 5611.85 8800.00 56.75 32.72 5890.56 5937.26 4354.81n 3685.68e 685045.05 6002976.54 0.00 5695.25 8900.00 56.75 32.72 5945.39 5992.09 4425.16n 3730.88e 685088.59 6003047.93 0.00 5778.66 9000.00 56.75 32.72 6000.23 6046.93 4495.52n 3776.08e 685132.13 6003119.32 0.00 5862.06 9100.00 56.75 32.72 6055.06 6101.76 4565.87n 3821.28e 685175.67 6003190.70 0.00 5945.47 9200.00 56.75 32.72 6109.90 6156.60 4636.23n 3866.48e 685219.21 6003262.09 0.00 6028.87 9300.00 56.75 32.72 6164.74 6211.44 4706.58n 3911.69e 685262.75 6003333.48 0.00 6112.28 9400.00 56.75 32.72 6219.57 6266.27 4776.94n 3956.89e 685306.29 6003404.87 0.00 6195.68 9500.00 56.75 32.72 6274.41 6321.11 4847.29n 4002.09e 685349.83 6003476.26 0.00 6279.09 9600.00 56.75 32.72 6329.25 6375.95 4917.65n 4047.29e 685393.37 6003547.64 0.00 6362.49 9700.00 56.75 32.72 6384.08 6430.78 4988.00n 4092.49e 685436.91 6003619.03 0.00 6445.90 9800.00 56.75 32.72 6438.92 6485.62 5058.35n 4137.70e 685480.45 6003690.42 0.00 6529.30 9900.00 56.75 32.72 6493.75 6540.45 5128.71n 4182.90e 685524.00 6003761.81 0.00 6612.71 10000.00 56.75 32.72 6548.59 6595.29 5199.06n 4228.10e 685567.54 6003833.20 0.00 6696.11 10100.00 56.75. 32.72 6603.43 6650.13 5269.42n 4273.30e 685611.08 6003904.58 0.00 6779.52 10200.00 56.75 32.72 6658.26 6704.96 5339.77n 4318.50e 685654.62 6003975.97 0.00 6862.92 10300.00 56.75 32.72 6713.10 6759.80 5410,13n 4363.70e 685698.16 6004047.36 0.00 6946.32 10400.00 56.75 32.72 6767.94 6814.64 5480.48n 4408.91e 685741.70 6004118.75 0.00 7029.73 10500.00 56.75 32.72 6822.77 6869.47 5550.84n 4454.11e 685785.24 6004190.13 0.00 7113.13 10600.00 56.75 32.72 6877.61 6924.31 5621.19n 4499.31e 685828.78 6004261.52 0.00 7196.54 4/16/97 11:53 AM Page 3 of 5 P2-19 [Wp5] ~e~lcal Section 36.87 {KB 46.7O MD Inc, Azl, TVDss TVDrkb Rect. Coordinates Grid Coordinates DLS Ve~ical NoAhing Easting Easting Northing de~100ff Section 10700.00 56.75 32,72 6932.45 6979.15 5691.55n 4544.51e 685872.32 6004332.91 0.00 7279.94 10800.00 56.75 32.72 6987.28 7033,98 5761,90n 4589.71e 685915.86 6004404.30 0.00 7363.35 10896,14 56.75 32,72 7040.00 7086.70 5829.54n 4633.17e 685957.72 6004472.93 0.00 7443.53 WEST SAK :10896'MD 10900,00 56.75 32.72 7042.12 7088.82 5832.25n 4634.92e 685959.40 6004475.69 0.00 7446.75 11000.00 56.75 32.72 7096.95 7143.65 5902.61n 4680.12e 686002.95 6004547.07 0.00 7530.16 11100.00 56,75 32.72 7151.79 7198.49 5972.96n 4725.32e 686046.49 6004618.46 0.00 7613.56 11200.00 56.75 32.72 7206.63 7253.33 6043.32n 4770.52e 686090.03 6004689.85 0.00 7696.97 11300.00 56.75 32.72 7261,46 7308.16 6113.67n 4815.72e 686133.57 6004761.24 0.00 7780.37 11400.00 56.75 32.72 7316.30 7363.00 6184.03n 4860.92e 686177.11 6004832.63 0.00 7863.78 11500.00 56,75 32.72 7371.14 7417.84 6254.38n 4906.13e 686220.65 6004904.01 0.00 7947.18 11600.00 56.75 32.72 7425.97 7472.67 6324.74n 4951.33e 686264.19 6004975.40 0.00 8030.59 11700.00 56.75 32.72 7480.81 7527.51 6395.09n 4996.53e 686307.73 6005046.79 0.00 8113.99 11800.00 56.75 32.72 7535.64 7582.34 6465.45n 5041.73e 686351.27 6005118.18 0.00 8197.40 11900.00 56.75 32.72 7590.48 7637.18 6535.80n 5086.93e 686394.81 6005189.57 0.00 8280.80 12000,00 56.75 32.72 7645.32 7692.02 6606.16n 5132.14e 686438.35 6005260.95 0.00 8364.21 12100.00 56.75 32.72 7700.15 7746.85 6676,51n 5177.34e 686481.90 6005332,34 0.00 8447.61 12200.00 56.75 32.72 7754.99 7801,69 6746.86n 5222.54e 686525.44 6005403.73 0.00 8531.02 12300.00 56.75 32.72 7809.83 7856.53 6817.22n 5267.74e 686568.98 6005475.12 0.00 8614.42 12400.00 56.75 32.72 7864.66 7911.36 6887.57n 5312.94e 686612.52 6005546.50 0.00 8697.82 12500.00 56.75 32.72 7919.50 7966.20 6957,93n 5358.14e 686656.06 6005617.89 0,00 8781.23 12600.00 56.75 32.72 7974.34 8021.04 7028.28n 5403.35e 686699.60 6005689,28 0.00 8864.63 12700.00 56.75 32.72 8029.17 8075.87 7098,64n 5448.55e 686743.14 6005760.67 0.00 8948.04 12800.00 56.75 32.72 8084.01 8130.71 7168.99n 5493.75e 686786.68 6005832.06 0.00 9031.44 12900.00 56.75 32.72 8138.84 8185.54 7239,35n 5538.95e 686830.22 6005903.44 0.00 9114.85 13000.00 56.75 32.72 8193.68 8240.38 7309.70n 5584.15e 686873.76 6005974.83 0.00 9198.25 13100.00 56.75 32.72 8248.52 8295.22 7380.06n 5629.36e 686917.30 6006046.22 0.00 9281.66 13200.00 56.75 32.72 8303.35 8350.05 7450.41n 5674.56e 686960,84 6006117.61 0.00 9365.06 13300.00 56.75 32.72 8358.19 8404.89 7520.77n 5719.76e 687004.39 6006189.00 0.00 9448.47 13400.00 56.75 32.72 8413.03 8459.73 7591.12n 5764.96e 687047.93 6006260.38 0.00 9531.87 13500.00 56.75 32.72 8467.86 8514.56 7661.47n 5810.16e 687091.47 6006331.77 0.00 9615.28 13600.00 56.75 32.72 8522.70 8569.40 7731.83n 5855.36e 687135.01 6006403.16 0.00 9698.68 13700.00 56.75 32.72 8577.53 8624.23 7802.18n 5900.57e 687178.55 6006474.55 0.00 9782.09 13800.00 56.75 32.72 8632.37 8679.07 7872.54n 5945.77e 687222.09 6006545.93 0.00 9865.49 13900.00 56,75 32.72 8687.21 8733.91 7942.89n 5990,97e 687265.63 6006617.32 0.00 9948.90 14000.00 56.75 32.72 8742.04 8788.74 8013.25n 6036.17e 687309.17 6006688.71 0.00 10032.30 14100.00 56.75 32.72 8796.88 8843.58 8083.60n 6081,37e 687352.71 6006760.10 0.00 10115.71 14200.00 56.75 32.72 8851.72 8898.42 8153.96n 6126.58e 687396,25 6006831.49 0.00 10199.11 14236.99 56.75 32.72 8872.00 8918.70 8179.98n 6143.30e 687412.36 6006857.89 0.00 10229.96 K-10:14237'MD 14300.00 56.75 32.72 8906.55 8953.25 8224.31n 6171.78e 687439.79 6006902.87 0.00 10282.51 4/16/97 11:53 AM Page 4 of 5 Comment P2-19 [Wp5] ~ertical Section 36.87 {KB 46.70 MD Inc. Azi. TVDss TVDrkb Rect. Coordinates Grid Coordinates DLS Vertical Northlng Eastlng Eastlng Northlng deg/100ft Section Comment ..~ 14300.82 56.75 32.72 8907.00 8953.70 8224.89n 6172.15e 687440.15 6006903.46 0.00 10283.20 HRZ: 14301'MD 14333.64 56.75 32.72 8925.00 8971.70 8247.98n 6186.98e 687454.44 6006926.89 0.00 10310.57 KALUBIK: 14334'MD 14346.41 56.75 32.72 8932.00 8978.70 8256.96n 6192.75e 687460.00 6006936.00 0.00 10321.22 KUPARUK (TARGET): 14346'1~ 14400.00 56.75 32.72 8961.39 9008.09 8294.67n 6216.98e 687483.34 6006974.26 0.00 10365.92 ~, c?~_ .,_.~:~. 14500.00 56.75 32.72 9016.23 9062.93 8365.02n 6262.18e 687526.88 6007045.65 0.00 10449.33 14596.24 56.75 32.72 9069.00 9115.70 8432.73n 6305.68e 687568.78 6007114.36 0.00 10529.60 WOC :14596'MD 14600.00 56.75 32.72 9071.06 9117.76 8435.38n 6307.38e 687570.42 6007117.04 0.00 10532.73 14700.00 56.75 32.72 9125.90 9172.60 8505.73n 6352.58e 687613.96 6007188.43 0.00 10616.14 14800.00 56.75 32.72 9180.73 9227.43 8576.09n 6397.79e 687657.50 6007259.82 0.00 10699.54 14900.00 56.75 32.72 9235.57 9282.27 8646.44n 6442.99e 687701.04 6007331.20 0.00 10782.95 15000.00 56.75 32.72 9290.41 9337.11 8716.80n 6488.19e 687744.58 6007402.59 0.00 10866.35 15100.00 56.75 32.72 9345.24 9391.94 8787.15n 6533.39e 687788.12 6007473.98 0.00 10949.76 15172.50 56.75 32.72 9385.00 9431.70 8838.16n 6566.16e 687819.69 6007525.74 0.00 11010.23 MILUVEACH :15173'MD 15200.00 56.75 32.72 9400.08 9446.78 8857.51n 6578.59e 687831.66 6007545.37 0.00 11033.16 15300.00 56.75 32,72 9454.92 9501.62 8927.86n 6623.80e 687875.20 6007616.76 0.00 11116.57 15400.00 56.75 32.72 9509.75 9556.45 8998.21n 6669.00e 687918.74 6007688.14 0.00 11199.97 15500.00 56.75 32,72 9564.59 9611.29 9068.57n 6714.20e 687962.29 6007759.53 0.00 11283.38 15600.00 56.75 32.72 9619.42 9666.12 9138.92n 6759.40e 688005.83 6007830.92 0.00 11366.78 15700.00 56.75 32.72 9674.26 9720.96 9209.28n 6804.60e 688049.37 6007902.31 0.00 11450.18 15706.35 56.75 32,72 9677.74 9724.44 9213.75n 6807.47e 688052.13 6007906.84 0.00 11455.48 15719.58 56.75 32,72 9685.00 9731.70 9223.06n 6813.46e 688057.89 6007916.29 0.00 11466.52 TD 7" CASING :15720'MD 4/16/97 11:53 AM Page 5 of 5 BP EXPLOR.~'ION To: B. Wondzell Oate: April 14, 1997 From: G. Hobbs Subject: Dispensation for 20 AAC 25.035 (7) .(b)(3) for the 1997 P2 Program Shared Services Drilling requests your consideration of a waiver of the diverter system identified in 20 AAC 25.035 (7)(b)(3) "Secondary Well Control: Blowout Prevention Equipment (BOPE) Requirements" based upon experience on Point Mclntyre 1 and 2 drilling projects. None of the 19 wells drilled on pad 1 or the 36 wells (including current well P2-13) on pad 2 at Point Mclntyre have experienced any difficulty with shallow gas in intervals prior to placement of surface casing. This historical evidence indicates a minimal risk from shallow gas for future wells drilled at the pad 2 area. With this history, we have concluded that the remainder of the 1997/98 Point Mclntyre pad 2 drilling program will have similar surface hole section as those that have been drilled previously. Therefore, based on the above assumptions, a diverter system does not seem necessary and request your consideration 0fa waiver for it. ~ ~ ~ ~'~ ~ '~: ~ Sincerely, SSD Engineer WELL PERMIT CHECKLISToo.~.Y ~,,,, NAHg~', ~./'~_~....~. P~_'-/~ PROGRAH: e×pl-I dev~'redrlFI servl-I wellbore segFI ann disp para reqFi ADMINISTRATION 1. Permit fee attached .................. 2. Lease number appropriate ............... 3. Unique well name and number .............. 4. Well located in a defined pool ............ 5. Well located proper distance from drlg unit boundary. 6. Well located proper distance from other wells ..... 7. Sufficient acreage available in drilling unit ..... 8. If deviated, is wellbore plat included ........ 9. Operator only affected party ............. 10. Operator has appropriate bond in force ........ 11. Permit can be issued without conservation order .... 12. Permit can be issued without administrative approval. 13. Can permit be approved before 15-day wait ....... ENGINEERING N N N N N N N N N N N N N REMARKS 14. Conductor string provided ............... ~ N 15. Surface casing protects all known USDWs ........ ~ N 16. CMT vol adequate to circulate on conductor & surf csg.. Y~ N 17. CMT vol adequate to tie-in long string to surf csg . . .Y~N~ 18. CMT will cover all known productive horizons ...... 19. Casing designs adequate for C, T, B & permafrost .... 20. Adequate tankage or reserve pit ............. ~ N 21. If a re-drill, has a 10-403 for abndnmnt been approved.~.~~-- 22. Adequate wellbore separation proposed ......... ~ N ~h~ 23. If diverter required, is it adequate .......... / \~ N~- L-"J 24. Drilling fluid program schematic & equip list adequate .(_Y-~'N 25. BOPEs adequate .................... ~ N 26. BOPE press rating adequate; test to ~~ psig.~ N ~ 27. Choke manifold complies w/API RP-53 (May 84) ...... N ~ 28. Work will occur without operation shutdown ....... N 29. Is presence of H2S gas probable ............ N GEOLOGY 30. Permit can be issued w/o hydrogen sulfide measures .... Y N~ 31. Seismic analysis of shallow gas zones .......... y N ~/~--4 / Data presented on potential overpressure zones ..... Y/~ ~ 32. 33. Seabed condition survey (if off-shore) ........ /Y N / ~- 34. Contact name/phone for weekly progress reports . . ./<.. Y N [exploratory only] ~ ENGINEERING: COMMISS ION: JDH ~ mcm Comments/Instructions: Well History File APPENDIX Information of detailed nature that is not particularly germane to the Well Permitting Process but is part of the history file. To improve the readability of the Well History file and to simplify finding information, information of this nature is accumulated at the end of the file under APPENDIX. No special effort has been made to chronologically organize this category of information. Sperry-Sun Drilling Services LIS Scan Utility Thu Jul 31 08:25:08 1997 Reel Header Service name ............. LISTPE Date ..................... 97/07/31 Origin ................... STS Reel Name ................ UNKNOWN Continuation Number ...... 01 Previous Reel Name ....... LrNKNOWN Comments ................. STS LIS Writing Library. Technical Services Scientific Tape Header Service name ............. LISTPE Date ..................... 97/07/31 Origin ................... STS Tape Name ................ UNKNOWN Continuation Number ...... 01 Previous Tape Name ....... UNKNOWN Comments ................. STS LIS Writing Library. Technical Services Scientific Physical EOF Comment Record TAPE HEADER PT. MCINTYRE MWD/MAD LOGS WELL NAME: API NUMBER: OPERATOR: LOGGING COMPANY: TAPE CREATION DATE: JOB DATA JOB NUMBER: LOGGING ENGINEER: OPERATOR WITNESS: SURFACE LOCATION SECTION: TOWNSHIP: RANGE: FNL: FSL: FEL: FWL: MWD RUN 3 AK-MM-70131 RANDY KRELL KEN MELDER ELEVATION (FT FROM MSL 0) KELLY BUSHING: DERRICK FLOOR: GROUND LEVEL: P2-19 500292276500 ARCO ALASKA, INC. SPERRY-SUN DRILLING SERVICES 31-JUL-97 14 12N 14E 5236 4054 47.60 46.30 12.20 WELL CASING RECORD 1ST STRING 2ND STRING 3RD STRING PRODUCTION STRING REMARKS: OPEN HOLE CASING DRILLERS BIT SIZE (IN) SIZE (IN) DEPTH (FT) 12.250 9.625 6983.0 8.500 15512.0 1. ALL DEPTHS ARE MEASURED DEPTHS (MD) UNLESS OTHERWISE NOTED. 2. MWD RUNS 1 AND 2 ARE DIRECTIONAL ONLY AND ARE NOT PRESENTED. 3. MWD RUN 3 IS DIRECTIONAL WITH DUAL GAMMA RAY (DGR), ELECTROMAGNETIC WAVE RESISTIVITY PHASE-4 (EWR-4), COMPENSATED NEUTRON POROSITY (CNP), AND STABILIZED LITHO DENSITY (SLD). 4. A MAD (MEASUREMENT AFTER DRILLING) PASS WAS PERFORMED FROM 6983'MD, 4893'SSTVD TO 14147'MD, 8765'SSTVD WHILE TRIPPING OUT OF THE HOLE AFTER MWD RUN 3. DUAL GAMMA RAY (DGR) AND ELECTROMAGNETIC WAVE RESISTIVITY PHASE-4 (EWR-4) ONLY LOGGED DURING THE MAD PASS INTERVAL. 5. CHANGE FROM SMOOTHED TOOL SPEED WHEN NOT DRILLING (SRAT) TO SMOOTHED RATE OF PENETRATION WHILE DRILLING (SROP) AT 14147'MD, 8765'SSTVD. 6. THIS WELL REACHED A TOTAL DEPTH (TD) OF 15512'MD, 9577'SSTVD. SRAT = SMOOTHED TOOL SPEED WHEN NOT DRILLING. SROP = SMOOTHED RATE OF PENETRATION WHILE DRILLING. SRGC = SMOOTHED GAMMA RAY COMBINED. SEXP = SMOOTHED PHASE SHIFT-DERIVED RESISTIVITY (EXTRA SHALLOW SPACING). SESP = SMOOTHED PHASE SHIFT-DERIVED RESISTIVITY (SHALLOW SPACING). SEMP = SMOOTHED PHASE SHIFT-DERIVED RESISTIVITY (MEDIUM SPACING). SEDP = SMOOTHED PHASE SHIFT-DERIVED RESISTIVITY (DEEP SPACING). SFXE = SMOOTHED FORMATION EXPOSURE TIME. SPSF = SMOOTHED COMPENSATED NEUTRON POROSITY (SANDSTONE MATRIX-FIXED HOLE SIZE). SNNA = SMOOTHED AVERAGE OF NEAR DETECTORS' COUNT RATES. SNFA = SMOOTHED AVERAGE OF FAR' DETECTORS COUNT RATES. SBDC = SMOOTHED BULK DENSITY (CALIPER CORRECTED). SCOR = SMOOTHED STANDOFF CORRECTION. SFPE = SMOOTHED FAR DETECTOR ONLY PHOTOELECTRIC ABSORPTION FACTOR. ENVIRONMENTAL PARAMETERS USED FOR NUCLEAR/NEUTRON LOG PROCESSING: HOLE SIZE = MUD FILTRATE SALINITY = MUD WEIGHT = FORMATION WATER SALINITY = FLUID DENSITY = MATRIX DENSITY = 14600 PPM 10.0 PPG 14545 PPM 1.00 G/CC 2.65 G/CC LITHOLOGY = $ File Header Service name ............. STSLIB.001 Service Sub Level Name... Version Number ........... 1.0.0 Date of Generation ....... 97/07/31 Maximum Physical Record..65535 File Type ................ LO Previous File Name ....... STSLIB.000 SANDSTONE DEPTH INCREMENT: FILE SUMMARY PBU TOOL CODE START DEPTH RPD 6902.5 RPM 6902.5 RPS 6902.5 RPX 6902.5 GR 6911.5 ROP 6980.5 FET 6983.0 FCNT 14103.5 NCNT 14103.5 NPHI 14103.5 PEF 14113.0 DRHO 14113.0 RHOB 14113.0 $ BASELINE CURVE FOR SHIFTS: Comment Record FILE HEADER FILE NUMBER: 1 EDITED MERGED MWD Depth shifted and clipped curves; all bit runs merged. .5000 CURVE SHIFT DATA (MEASURED DEPTH) 14243 14312 14313 14318 14321 14329 14332 14334 14338 14340 14342 14346 14351 14355 14360 14368 14370 14371 BASELINE DEPTH GR 6902.5 6905 .0 14245 .0 14316 .5 14317 .5 14322 .0 14325 .5 14330 .0 14333 5 14336 0 14340 0 14343 5 14345 0 14349 0 14352 0 14356 5 14361 0 14369 0 14372 5 14374 14375 5 14377 14379.0 14382 .0 .5 .0 .5 .0 .5 .5 .5 .5 .5 .0 .0 .0 5 5 0 5 5 0 0 0 STOP DEPTH 15453.0 15453.0 15453.0 15453.0 15480.5 15512.5 15453.0 15460.5 15460.5 15460.5 15469.5 15469.5 15469.5 EQUIVALENT UNSHIFTED DEPTH 14382.0 14385.0 14385.0 14388.0 14388.5 14390.5 14390 . 5 14393 . 0 14392.5 14394.5 14394.5 14397.0 14405.0 14406.5 14409.0 14410.0 14410.5 14412.0 14415.5 14416.5 14419.0 14421.0 14425.0 14426.0 14428.5 14430.5 14437.5 14439.5 14451.0 14456.0 14460.5 14464.5 14480.0 14482.0 14488.5 14486.0 14495.0 14492.0 14498.5 14499.0 14549.5 14546.5 14551.5 14550.0 14605.0 14604.0 14608.5 14608.5 15512.5 15512.5 $ MERGED DATA SOURCE PBU TOOL CODE $ REMARKS: MERGED MAIN PASS. $ BIT RUN NO MERGE TOP MERGE BASE 3 14147.0 15512.0 Data Format Specification Record Data Record Type .................. 0 Data Specification Block Type ..... 0 Logging Direction ................. Down Optical log depth units ........... Feet Data Reference Point .............. Undefined Frame Spacing ..................... 60 .liN Max frames per record ............. Undefined Absent value ...................... -999.25 Depth Units ....................... Datum Specification Block sub-type...0 Name Service Order Units DEPT FT 4 1 68 ROP MWD FT/H 4 1 68 GR MWD AAPI 4 1 68 RPX MWD OHMM 4 1 68 RPS MWD OHMM 4 1 68 RPM MWD OHM~ 4 1 68 RPD MWD OHMM 4 1 68 NPHI MWD P.U. 4 1 68 NCNT MWD CNTS 4 1 68 FCNT MWD CNTS 4 1 68 RHOB MWD G/CC 4 1 68 DRHO MWD G/CC 4 1 68 Size Nsam Rep Code Offset Channel 0 1 4 2 8 3 12 4 16 5 20 6 24 7 28 8 32 9 36 10 40 11 44 12 PEF MWD BARN 4 1 68 FET MWD HOUR 4 1 68 48 52 13 14 Name Min Max Mean Nsam DEPT 6902.5 15512.5 11207.5 17221 ROP 18.9127 2700 1157.37 17065 GR 21.1819 237.824 86.2393 17139 RPX 0.3304 609.634 3.11603 17102 RPS 0.4334 2000 4.34378 17102 RPM 0.6059 2000 4.5883 17102 RPD 0.3434 2000 4.53443 17102 NPHI 19.91 81.7622 45.8163 2715 NCNT 2184.6 3561.24 2746.46 2715 FCNT 453.521 833.176 585.105 2715 RHOB 2.1994 2.9205 2.41845 2714 DRHO -0.269 0.2263 0.00212511 2714 PEF 1.8699 18.3465 2.85055 2714 FET 0.3364 183.678 116.16 16941 First Reading 6902 5 6980 5 6911 5 6902 5 6902 5 6902 5 6902 5 14103 5 14103 5 14103 5 14113 14113 14113 6983 Last Reading 15512.5 15512.5 15480.5 15453 15453 15453 15453 15460.5 15460.5 15460.5 15469.5 15469.5 15469.5 15453 First Reading For Entire File .......... 6902.5 Last Reading For Entire File ........... 15512.5 File Trailer Service name ............. STSLIB.001 Service Sub Level Name... Version Number ........... 1.0.0 Date of Generation ....... 97/07/31 Maximum Physical Record..65535 File Type ................ LO Next File Name ........... STSLIB.002 Physical EOF File Header Service name ............. STSLIB.002 Service Sub Level Name... Version Number ........... 1.0.0 Date of Generation ....... 97/07/31 Maximum Physical Record..65535 File Type ................ LO Previous File Name ....... STSLIB.001 Comment Record FILE HEADER FILE NUMBER: 2 RAW MWD Curves and log header data for each bit run in separate files. BIT RUN NUMBER: 3 DEPTH INCREMENT: .5000 FILE SUMMARY VENDOR TOOL CODE START DEPTH STOP DEPTH RPD 6905 . 0 15453 . 0 RPM 6905.0 RPS 6905.0 RPX 6905.0 GR 6914.0 ROP 6983.0 FET 6985.5 FCNT 14106.0 NCNT 14106.0 NPHI 14106.0 PEF 14115.5 DRHO 14115.5 RHOB 14115.5 $ LOG HEADER DATA DATE LOGGED: SOFTWARE SURFACE SOFTWARE VERSION: DOWNHOLE SOFTWARE VERSION: DATA TYPE (MEMORY OR REAL-TIME): TD DRILLER (FT): TOP LOG INTERVAL (FT): BOTTOM LOG INTERVAL (FT): BIT ROTATING SPEED (RPM): HOLE INCLINATION (DEG MINIMUM ANGLE: MAXIMUM ANGLE: 15453 15453 15453 15480 15512 15453 15460 15460 15460 15469 15469 15469 TOOL STRING (TOP TO BOTTOM) VENDOR TOOL CODE TOOL TYPE DGR DUAL GAMMA RAY EWR4 ELECTROMAG. RESIS. 4 CNP COMPENSATED NEUTRON SLD STABILIZED LITHO DEN $ BOREHOLE AND CASING DATA OPEN HOLE BIT SIZE (IN): DRILLER'S CASING DEPTH (FT): BOREHOLE CONDITIONS MUD TYPE: MUD DENSITY (LB/G) : MUD VISCOSITY (S) : MUD PH: MUD CHLORIDES (PPM) : FLUID LOSS (C3) : RESISTIVITY (OI-5VIM) AT TEMPERATURE (DEGF) MUD AT MEASURED TEMPERATURE (MT): MUD AT MAX CIRCULATING TERMPERATURE: MUD FILTRATE AT MT: MUD CAKE AT MT: NEUTRON TOOL MATRIX: MATRIX DENSITY: HOLE CORRECTION (IN): TOOL STANDOFF (IN) : EWR FREQUENCY (HZ) : .0 .0 .0 .5 .5 .0 .5 .5 .5 .5 .5 .5 19-MAY-97 5.06 5.46 MEMORY 15512.0 14147.0 15512.0 53.4 55.6 TOOL ~ER P0724CRNDG6 P0724CRNDG6 P0724CRNDG6 P0724CRNDG6 8.500 8.5 KCL / POLYMER 10.00 51.0 9.0 14600 4.4 .200 .108 .180 .340 69.4 REMARKS: $ Data Format Specification Record Data Record T!rpe .................. 0 Data Specification Block Type ..... 0 Logging Direction ................. Down Optical log depth units ........... Feet Data Reference Point .............. Undefined Frame Spacing ..................... 60 .lin Max frames per record ............. Undefined Absent value ...................... -999.25 Depth Units ....................... Datum Specification Block sub-type...0 Name Service Order Units Size Nsam Rep DEPT FT 4 1 68 GR MWD 3 AAPI 4 1 68 RPX MWD 3 OHMM 4 1 68 RPS MWD 3 OHMM 4 1 68 RPM MWD 3 OHMM 4 1 68 RPD MWD 3 OHMM 4 1 68 NPHI MWD 3 P.U. 4 1 68 ROP MWD 3 FT/H 4 1 68 FET MWD 3 HOUR 4 1 68 FCNT MWD 3 CNTS 4 1 68 NCNT MWD 3 CNTS 4 1 68 RHOB MWD 3 G/CC 4 1 68 DRHO MWD 3 G/CC 4 1 68 PEF MWD 3 BARN 4 1 68 code Offset Channel 0 1 4 2 8 3 12 4 16 5 20 6 24 7 28 8 32 9 36 10 40 11 44 12 48 13 52 14 Name Min Max Mean Nsam DEPT 6905 15512.5 11208.8 17216 GR 21.1819 237.824 86.233 17134 RPX 0.3304 609.634 3.11206 17097 RPS 0.4334 2000 4.28772 17097 RPM 0.6059 2000 4.53413 17097 RPD 0.3434 2000 4.58559 17097 NPHI 19.91 81.7622 45.8329 2710 ROP 18.9127 2700 1157.65 17060 FET 0.3364 183.678 116.194 16936 FCNT 453.521 833.176 585.122 2710 NCNT 2184.6 3561.24 2746.39 2710 RHOB 2.1994 2.9205 2.41912 2709 DRHO -0.269 0.2263 0.00218741 2709 PEF 1.8699 18.3465 2.84859 2709 First Reading 6905 6914 6905 6905 6905 6905 14106 6983 6985.5 14106 14106 14115.5 14115.5 14115.5 Last Reading 15512.5 15480.5 15453 15453 15453 15453 15460.5 15512.5 15453 15460.5 15460.5 15469.5 15469.5 15469.5 First Reading For Entire File .......... 6905 Last Reading For Entire File ........... 15512.5 File Trailer Service name ............. STSLIB.002 Service Sub Level Name... Version Number ........... 1.0.0 Date of Generation ....... 97/07/31 Maximum Physical Record..65535 File Type ................ LO Next File Name ........... STSLIB.003 Physical EOF Tape Trailer Service name ............. LISTPE Date ..................... 97/07/31 Origin ................... STS Tape Name ................ UNKNOWN Continuation Number ...... 01 Next Tape Name ........... UAVKNOWN Comments ................. STS LIS Writing Library. Technical Services Reel Trailer Service name ............. LISTPE Date ..................... 97/07/31 Origin ................... STS Reel Name ................ UNKNOWN Continuation Number ...... 01 Next Reel Name ........... UNKNOWN Comments ................. STS LIS Writing Library. Technical Services Scientific Scientific Physical EOF Physical EOF End Of LIS File Sperry-Sun Drilling Services LIS Scan Utility Mon Aug 04 13:52:27 1997 Reel Header Service name ............. LISTPE Date ..................... 97/08/04 Origin ................... STS Reel Name ................ UNKNOWN Continuation Number ...... 01 Previous Reel Name ....... UNKNOWN Comments ................. STS LIS Writing Library. Technical Services Tape Header Service name ............. LISTPE Date ..................... 97/08/04 Origin ................... STS Tape Name ................ UNKNOWN Continuation Number ...... 01 Previous Tape Name ....... UNKNOWN Comments ................. STS LIS Writing Library. Technical Services Scientific Scientific Physical EOF Comment Record TAPE HEADER PT. MCINTYRE MWD/MAD LOGS WELL NAME: API NUMBER: OPERATOR: LOGGING COMPANY: TAPE CREATION DATE: JOB DATA JOB NUMBER: LOGGING ENGINEER: OPERATOR WITNESS: SURFACE LOCATION SECTION: TOWNSHIP: RANGE: FNL: FSL: FEL: FWL: MWD RUN 5 AK-MM-70151 R. KRELL K. FIELDER ELEVATION (FT FROM MSL 0) KELLY BUSHING: DERRICK FLOOR: GROUND LEVEL: M CROFILMED Date___U_~ 0 ,.~- t~ / P2-45 PB2 500292276971 ARCO ALASKA, INC. SPERRY-SUN DRILLING SERVICES 04-AUG-97 MWD RUN 8 AK-MM-7 0151 T. MCGUIRE K. WHITE 14 12N 14E 398 1296 44.70 44.70 10.80 RECEIVED AUG 06 199i' Al~-ka Oil & Gas Cons. Oommissior~ Anchorage WELL CASING RECORD 1ST STRING 2ND STRING 3RD STRING PRODUCTION STRING REMARKS: OPEN HOLE CASING DRILLERS BIT SIZE (IN) SIZE (IN) DEPTH (FT) 12.250 9.625 6992.0 8.500 15064.0 1. ALL DEPTHS ARE MEASURED DEPTHS (MD) UNLESS OTHERWISE NOTED. 2. ANNULAR HYDRAULICS ARE CALCULATED USING THE POWER LAW MODEL. 3. MWD RUNS 1 THROUGH 4 ARE DIRECTIONAL ONLY AND ARE NOT PRESENTED. 4. MWD RUN 5 IS DIRECTIONAL WITH DUAL GAMMA RAY (DGR), ELECTROMAGNETIC WAVE RESISTIVITY PHASE-4 (EWR-4), COMPENSATED NEUTRON POROSITY (CNP) AND STABILIZED LITHO DENSITY (SLD). 5. NO COMPENSATED NEUTRON POROSITY (CNP) OR STABILIZED LITHO DENSITY (SLD) DATA ACQIURED DURING MWD RUN 5 DUE TO TOOL FAILURE. 6. MWD RUNS 6,7 AND 9 CONTAIN NO VALID DATA AND ARE NOT PRESENTED. 7. MWD RUN 8 IS DIRECTIONAL WITH DUAL GAMMA RAY (DGR) AND ELECTROMAGNETIC WAVE RESISTIVITY PHASE-4 (EWR-4). 8. A MAD (MEASUREMENT AFTER DRILLNG) PASS WAS PERFORMED FROM 6988'MD, 4904'SSTVD TO 13855'MD, 8407'SSTVD WHILE TRIPPING INTO THE HOLE FOR MWD RUN NUMBER 5. 9. CHANGE FROM SMOOTHED TOOL SPEED WHEN NOT DRILLING (SRAT) TO SMOOTHED RATE OF PENETRATION WHILE DRILLING (SROP) AT 13855'MD, 8407'SSTVD. 10. DEPTH SHIFTING/CORRECTION OF MWD DATA IS WAIVED AS PER THE PHONE CONVERSATION BETWEEN ALI TURKER OF SPERRY-SUN DRILLING SERVICES AND TOM WALKER OF ARCO ALASKA, INC. ON 21 JULY, 1997. 11. THIS WELL REACHED A TOTAL DEPTH (TD) OF 15064'MD, 9026'SSTVD. SRAT = SMOOTHED TOOL SPEED WHEN NOT DRILLING. SROP = SMOOTHED RATE OF PENETRATION WHILE DRILLING. SGRC = SMOOTHED GAMMA RAY COMBINED. SEXP = SMOOTHED PHASE SHIFT-DERIVED RESISTIVITY (EXTRA SHALLOW SPACING). SESP = SMOOTHED PHASE SHIFT-DERIVED RESISTIVITY (SHALLOW SPACING). SEMP = SMOOTHED PHASE SHIFT-DERIVED RESISTIVITY (MEDIUM SPACING). SEDP = SMOOTHED PHASE SHIFT-DERIVED RESISTIVITY (DEEP SPACING). SFXE = SMOOTHED FORMATION EXPOSURE TIME. $ File Header Service name ............. STSLIB.001 Service Sub Level Name... Version Number ........... 1.0.0 Date of Generation ....... 97/08/04 Maximum Physical Record..65535 File Type ................ LO Previous File Name ....... STSLIB.000 Comment Record FILE HEADER FILE NUMBER: 1 EDITED MERGED MWD Depth shifted and clipped curves; all bit runs merged. DEPTH INCREMENT: .5000 FILE SUMMARY PBU TOOL CODE START DEPTH GR 6956.0 ROP 6988.5 RPD 6990.5 RPM 6990.5 RPS 6990.5 RPX 6990.5 FET 7005.5 $ BASELINE CURVE FOR SHIFTS: CURVE SHIFT DATA (MEASURED DEPTH) BASELINE DEPTH $ MERGED DATA SOURCE PBU TOOL CODE $ REMARKS: STOP DEPTH 15035.0 15064.5 15028.0 15028.0 15028.0 15028.0 15028.0 EQUIVALENT UNSHIFTED DEPTH BIT RUN NO MERGE TOP MERGE BASE 5 13907.0 14038.0 8 13855.0 15064.0 MERGED MAIN PASS. $ Data Format Specification Record Data Record Type .................. 0 Data Specification Block Type ..... 0 Logging Direction ................. Down Optical log depth units ........... Feet Data Reference Point .............. Undefined Frame Spacing ..................... 60 .lin Max frames per record ............. Undefined Absent value ...................... -999.25 Depth Units ....................... Datum Specification Block sub-type...0 Name Service Order Units Size Nsam Rep DEPT FT 4 1 68 ROP MWD FT/H 4 1 68 GR MWD AAPI 4 1 68 RPX MWD OHMM 4 1 68 RPS MWD OHMM 4 1 68 RPM MWD OHMM 4 1 68 RPD MWD OHMI~ 4 1 68 FET MWD HOUR 4 1 68 Code Offset Channel 0 1 4 2 8 3 12 4 16 5 20 6 24 7 28 8 Name Min Max DEPT 6956 15064.5 ROP 4.3838 5686.52 GR 13.253 359.991 RPX 0.8679 48.2946 RPS 0.9303 409.579 RPM 0.2773 677.181 RPD 0.1919 2000 FET 0.2753 123.742 Mean Nsam 11010.2 16218 938.311 16153 79.5162 16159 3.81582 16076 4.4389 16076 4.82543 16076 6.45247 16076 68.5677 16046 First Reading 6956 6988.5 6956 6990.5 6990.5 6990.5 6990.5 7005.5 Last Reading 15064.5 15064.5 15035 15028 15028 15028 15028 15028 First Reading For Entire File .......... 6956 Last Reading For Entire File ........... 15064.5 File Trailer Service name ............. STSLIB.001 Service Sub Level Name... Version Number ........... 1.0.0 Date of Generation ....... 97/08/04 Maximum Physical Record..65535 File Type ................ LO Next File Name ........... STSLIB.002 Physical EOF File Header Service name ............. STSLIB.002 Service Sub Level Name... Version Number ........... 1.0.0 Date of Generation ....... 97/08/04 Maximum Physical Record..65535 File Type ................ LO Previous File Name ....... STSLIB.001 Comment Record FILE HEADER FILE NUMBER: 2 RAW MWD Curves and log header data for each bit run in separate files. BIT RI/NNUI~BER: 5 DEPTH INCREMENT: .5000 FILE SUMMARY VENDOR TOOL CODE START DEPTH GR 6956.0 ROP 6988.5 RPD 6990.5 RPM 6990.5 RPS 6990.5 RPX 6990.5 FET 7005.5 $ STOP DEPTH 13854.5 13854.5 13854.5 13854.5 13854.5 13854.5 13854.5 LOG HEADER DATA DATE LOGGED: SOFTWARE SURFACE SOFTWARE VERSION: DOWNHOLE SOFTWARE VERSION: DATA TYPE (MEMORY OR REAL-TIME): TD DRILLER (FT) : TOP LOG INTERVAL (FT): BOTTOM LOG INTERVAL (FT): BIT ROTATING SPEED (RPM): HOLE INCLINATION (DEG MINIMUM ANGLE: MAXIMUM ANGLE: TOOL STRING (TOP TO BOTTOM) VENDOR TOOL CODE TOOL TYPE DGR DUAL GAMMA RAY EWR4 ELECTROMAG. RESIS. 4 CNP COMPENSATED NEUTRON SLD STABILIZED LITHO DEN $ BOREHOLE AND CASING DATA OPEN HOLE BIT SIZE (IN): DRILLER'S CASING DEPTH (FT): BOREHOLE CONDITIONS MUD TYPE: MUD DENSITY (LB/G): MUD VISCOSITY (S): MUD PH: MUD CHLORIDES (PPM): FLUID LOSS (C3): RESISTIVITY (OHMM) AT TEMPERATURE (DEGF) MUD AT MEASURED TEMPERATURE (MT): MUD AT MAX CIRCULATING TERMPERATURE: MUD FILTRATE AT MT: MUD CAKE AT MT: NEUTRON TOOL MATRIX: MATRIX DENSITY: HOLE CORRECTION (IN): TOOL STANDOFF (IN) : EWR FREQUENCY (HZ) : REMARKS: $ Data Format Specification Record Data Record Type .................. 0 Data Specification Block Type ..... 0 Logging Direction ................. Down Optical log depth units ........... Feet Data Reference Point .............. Undefined Frame Spacing ..................... 60 .lin Max frames per record ............. Undefined Absent value ...................... -999.25 Depth units ....................... 14-JUN-97 5.06 AND 4.96 5.46 MEMORY 14038.0 13907.0 14038.0 60.2 60.2 TOOL IqlIMBER P0736CRNDG6 P0736CRNDG6 P0736CRNDG6 P0736CRNDG6 8.500 8.5 KCL / POLYMER 10.50 45.0 8.0 30000 5.0 .380 .184 .280 .570 68.3 Datum Specification Block sub-type...0 Name Service Order Units Size Nsam DEPT FT 4 1 ROP MWD 5 FT/H 4 1 GR MWD 5 AAPI 4 1 RPX MWD 5 OHMM 4 1 RPS MWD 5 OHMM 4 1 RPM MWD 5 OHMM 4 1 RPD MWD 5 OHMM 4 1 FET MWD 5 HOUR 4 1 Rep Code Offset Channel 68 0 1 68 4 2 68 8 3 68 12 4 68 16 5 68 20 6 68 24 7 68 28 8 Name Min Max DEPT 6956 13854.5 ROP 13.3762 5686.52 GR 13. 253 138. 828 RPX 0. 8679 24.2759 RPS 0.9303 23. 7856 RPM 0.2773 35. 0348 RPD 0. 1919 2000 FET 30.1393 123. 742 Mean Nsam 10405.2 13798 1093.77 13733 72.8711 13798 3.34236 13729 3.3745 13729 3.37988 13729 5.29677 13729 80.0502 13699 First Reading 6956 6988.5 6956 6990.5 6990.5 6990.5 6990.5 7O05.5 Last Reading 13854.5 13854 5 13854 5 13854 5 13854 5 13854 5 13854 5 13854.5 First Reading For Entire File .......... 6956 Last Reading For Entire File ........... 13854.5 File Trailer Service name ............. STSLIB.002 Service Sub Level Name... Version Number ........... 1.0.0 Date of Generation ....... 97/08/04 Maximum Physical Record..65535 File Type ................ LO Next File Name ........... STSLIB.003 Physical EOF File Header Service name ............. STSLIB.003 Service Sub Level Name... Version Number ........... 1.0.0 Date of Generation ....... 97/08/04 Maximum Physical Record..65535 File Type ................ LO Previous File Name ....... STSLIB.002 Comment Record FILE HEADER FILENUI~BER: 3 RAW MWD Curves and log header data for each bit run in separate files. BIT RU-NNUM~ER: 8 DEPTH INCREMENT: .5000 FILE SUMMARY VENDOR TOOL CODE START DEPTH STOP DEPTH FET 13855.0 15028.0 RPD 13855.0 15028.0 RPM 13855.0 15028.0 RPS 13855.0 15028.0 RPX 13855.0 15028.0 GR 13855.0 15035.0 ROP 13855.0 15064.5 $ LOG HEADER DATA DATE LOGGED: SOFTWARE SURFACE SOFTWARE VERSION: DOWNHOLE SOFTWARE VERSION: DATA TYPE (MEMORY OR REAL-TIME): TD DRILLER (FT): TOP LOG INTERVAL (FT): BOTTOM LOG INTERVAL (FT): BIT ROTATING SPEED (RPM): HOLE INCLINATION (DEG MINIMUM A~GLE: MAXIMUM ANGLE: TOOL STRING (TOP TO BOTTOM) VENDOR TOOL CODE TOOL TYPE DGR DUAL GAMMA RAY EWR4 ELECTROMAG. RESIS. 4 $ BOREHOLEAND CASING DATA OPEN HOLE BIT SIZE (IN): DRILLER'S CASING DEPTH (FT): BOREHOLE CONDITIONS MUD TYPE: MUD DENSITY (LB/G) : MUD VISCOSITY (S) : MUD PH: MUD CHLORIDES (PPM): FLUID LOSS (C3): RESISTIVITY (OHMM) AT TEMPERATURE (DEGF) MUD AT MEASURED TEMPERATURE (MT): MUD AT MAX CIRCULATING TERMPERATURE: MUD FILTRATE AT MT: MUD CAKE AT MT: NEUTRON TOOL MATRIX: MATRIX DENSITY: HOLE CORRECTION (IN): TOOL STANDOFF (IN): EWR FREQUENCY (HZ): REMARKS: $ Data Format Specification Record 30-JUN- 97 5.06 AND 4.96 5.46 MEMORY 15064.0 13855.0 15064.0 55.4 65.8 TOOL NUMBER P0765CRG6 P0765CRG6 8'.500 8.5 KCL / POLYMER 10.50 51.0 10.5 31000 4.6 .150 .078 .120 .200 66.1 Data Record Type .................. 0 Data Specification Block Type ..... 0 Logging Direction ................. Down Optical log depth units ........... Feet Data Reference Point .............. Undefined Frame Spacing ..................... 60 .lin Max frames per record ............. Undefined Absent value ...................... -999.25 Depth Units ....................... Datum Specification Block sub-type...0 DEPT GR RPX RPS RPM RPD ROP FET Name Service Order Units Size Nsam Rep FT 4 1 68 MWD 8 AAPI 4 1 68 MWD 8 OHMM 4 1 68 MWD 8 OHMM 4 1 68 MWD 8 OHMM 4 1 68 MWD 8 OHMM 4 1 68 MWD 8 FT/H 4 1 68 FfWD 8 HOUR 4 1 68 Code Offset Channel 0 1 4 2 8 3 12 4 16 5 20 6 24 7 28 8 Name Min Max Mean Nsam DEPT 13855 15064.5 14459.8 2420 GR 28.6498 359.991 118.351 2361 RPX 1.0663 48.2946 6.58538 2347 RPS 1.3599 409.579 10.6652 2347 RPM 1.102 677.181 13.2813 2347 RPD 1.1327 217.746 13.2129 2347 ROP 4.3838 1249.74 56.1169 2420 FET 0.2753 11.4215 1.54675 2347 First Reading 13855 13855 13855 13855 13855 13855 13855 13855 Last Reading 15064.5 15035 15028 15028 15028 15028 15064.5 15028 First Reading For Entire File .......... 13855 Last Reading For Entire File ........... 15064.5 File Trailer Service name ............. STSLIB.003 Service Sub Level Name... Version Number ........... 1.0.0 Date of Generation ....... 97/08/04 Maximum Physical Record..65535 File Type ................ LO Next File Name ........... STSLIB.004 Physical EOF Tape Trailer Service name ............. LISTPE Date ..................... 97/08/04 Origin ................... STS Tape Name ................ UNKNOWN Continuation Number ...... 01 Next Tape Name ........... UNKNOWN Comments ................. STS LIS Writing Library. Scientific Technical Services Reel Trailer Service name ............. LISTPE Date ..................... 97/08/04 Origin ................... STS Reel Name ................ UNKNOWN Continuation Number ...... 01 Next Reel Name ........... UNKNOWN Comments ................. STS LIS Writing Technical Services Library. Scientific Physical EOF Physical EOF End Of LIS File .J .............................. RECEIVED . ,- ** .~sKA CO,',,~UTING C.~'TER ** dUL b 1 199~' ............................. ~ka Oil & ........ sc~~ ........ * ............................ ****************************** COMPANY NAME : ARCO ALASKA, INC. WRLL N£~'E : P2 - 19 FIELD NAME : POINT MCINTYRE BOROUGH : NORTH SLOPE STATE : ALASKA API NUMBER : 500292276500 REFERENCE NO : 97330 LIS Tape Verification Listing Schlumberger Alaska Computing Center 30-JUL-1997 09:40 PAGE: **** REEL HEADER **** SERVICE NAME : EDIT DATE : 97/07/30 ORIGIN : FLIC REEL NA~E : 97330 CONTINUATION # : PREVIOUS REEL COf~4~IVT : ARCO ALASKA INC, POINT MCINTYRE, P2-19, API #50-029-22765-00 **** TAPE HEADER **** SERVICE NAME : EDIT DATE : 97/07/30 ORIGIN : FLIC TAPE NAME : 97330 CONTINUATION # : 1 PREVIOUS TAPE : COFk~_t%Ff : ARCO ALASKA INC, POINT MCINTYRE, P2~19, API #50-029-22765-00 TAPE HEADER POINT MCINTYRE CASED HOLE WIRELINE LOGS WELL NAME: P2-19 API NUMBER: 500292276500 OPERATOR: ARCO ALASKA, INC. LOGGING COMPANY: SCHLUMBERGER WELL SERVICES TAPE CREATION DATE: 30 -JUL- 97 JOB NUMBER: 97330 LOGGING ENGINEER: BARTZ OPERATOR WITNESS: JULIAN SURFACE LOCATION SE C TI ON: 14 TOWNSHIP: 12N RANGE: 14E FNL: FSL: 5236 FEL: 4054 FWL: ELEVATION (FT FROM MSL O) KELLY BUSHING: 47.60 DERRICK FLOOR: 46.30 GROUND LEVEL: 12.20 WELL CASING RECORD OPEN HOLE CASING DRILLERS CASING BIT SIZE (IN) SIZE (IN) DEPTH (FT) WEIGHT (LB/FT) 1ST STRING 6. 500 7. 000 29. O0 2ND STRING 3RD STRING PRODUCTION STRING CURVE SHIFT DATA - ALL PASSES TO STANDARD(MEASURED DEPTH) LIS Tape Verification Listing Schlumberger Alaska Computing Center 30-JUL-1997 09:40 BASELINE CURVE FOR SHIFTS LDWG TOOL CODE: LDWG CURVE CODE: RUN NUMBER: PASS NUMBER: DATE LOGGED: LOGGING COMPANY: .......... EQUIVALENT UNSHIFTED DEPTH .......... BASELINE DEPTH $ REMARKS: THIS TAPE CONTAINS THE CASED HOLE LDWG EDIT FOR ARCO ALASKA WELL P2-19 GR/CCL. THIS LOG IS THE PRIMARY DEPTH CONTROL FOR THE WELL. THE GR/CCL WAS RUN WITH THE CET/CBT $ $ PAGE: **** FILE H~ER **** FILE NAME : EDIT .001 SERVICE : FLIC VERSION : O01CO1 DATE : 97/07/30 MAX REC SIZE : 1024 FILE TYPE : LO LAST FILE : FILE HEADER FILENUAIBER: 1 EDITED CURVES Depth shifted and clipped curves for each pass in separate files. PASS NUM~ER: 1 DEPTH INCREFiF2VT: 0.5000 FILE SU~4~ARY LDWG TOOL CODE START DEPTH STOP DEPTH GRCH 14637.0 14225.0 $ CURVE SHIFT DATA - PASS TO PASS (FiEAS~ DEPTH) BASELINE CURVE FOR SHIFTS LDWG CURVE CODE: PASS NUMBER: BASELINE DEPTH $ .......... EQUIVALENT UNSHIFTEDDEPTH .......... GRCH ....... REMARKS: THIS FILE CONTAINS THE CLIPPED MAIN PASS DATA. THIS LIS Tape Verification Listing Schlumberger Alaska Computing Center 30-JUL-1997 09:40 PAGE: LOG IS THE PRIMARY DEPTH CONTROL AND NO DEPTH SHIFTING WAS PERFORMED. $ LIS FORMAT DATA ** DATA FORMAT SPECIFICATION RECORD ** ** SET TYPE - 64EB ** TYPE REPR CODE VALUE 1 66 0 2 66 0 3 73 12 4 66 1 5 66 6 73 7 65 8 68 O. 5 9 65 FT 11 66 85 12 68 13 66 0 14 65 FT 15 66 68 16 66 1 0 66 0 ** SET TYPE - CHAN ** NAME SERV UNIT SERVICE API API API API FILE NUMB NUMB SIZE REPR PROCESS ID ORDER # LOG TYPE CLASS MOD NUMB SAMP ELEM CODE (HEX) DEPT FT 572289 O0 000 O0 0 1 1 1 4 68 0000000000 GRCH CET GAPI 572289 O0 000 O0 0 1 1 1 4 68 0000000000 TENS CET LB 572289 O0 000 O0 0 1 1 1 4 68 0000000000 ** DATA ** DEPT. 14637.000 GRCH. CET 68.824 TENS. CET 4504.000 DEPT. 14225.000 GRCH. CET 91.597 TENS. CET 4227.000 ** END OF DATA ** LIS Tape Verification Listing Schlumberger Alaska Computing Center 30-JUL-1997 09:40 PAGE: **** FILE TRAILER **** FILE NAME : EDIT .001 SERVICE : FLIC VERSION : O01CO1 DATE · 97/07/30 MAX REC SIZE : 1024 FILE TYPE : LO LAST FILE : **** FILE HEADER **** FILE NA~E : EDIT .002 SERVICE : FLIC VERSION : O01CO1 DATE : 97/07/30 MAX REC SIZE : 1024 FILE TYPE : LO LAST FILE : CET $ LOG HEADER DATA FILE HEADER FILE NUMBER 2 RAW CURVES Curves and log header data for each pass in separate files; raw background pass in last file PASS NUM~ER: 1 DEPTH INCREMENT: 0.5000 FILE SUN~W_ARY VENDOR TOOL CODE START DEPTH STOP DEPTH 14694.0 14224.5 DATE LOGGED: 14-JUN-97 SOFTWARE VERSION: 8C0-609 TIME LOGGER ON BOTTOM: 1500 14-JUN-97 TD DRILLER (FT) : 14685.0 TD LOGGER (FT) : 14670.0 TOP LOG INTERVAL (FT) : 14225.0 BOTTOM LOG INTERVAL (FT) : 14685.0 LOGGING SPEED (FPHR): 1800.0 DEPTH CONTROL USED (YES/NO): YES TOOL STRING (TOP TO BOTTOM) VENDOR TOOL CODE TOOL TYPE TOOL NUMBER CET CEMENT BOND AH-lO7 CET CEMENT BOND CME-AF CET CEMENT BOND CBC-EB CET CEMENT BOND ECH- VC CET CEMENT BOND CEEC~ C CET CEMENT BOND CESS-A LIS Tape Verification Listing Schlumberger Alaska Computing Center 30-JUL-1997 09:40 PAGE: BOREHOLE AND CASING DATA OPEN HOLE BIT SIZE (IN): DRILLERS CASING DEPTH (FT) : LOGGERS CASING DEPTH (FT): BOREHOLE CONDITIONS FLUID TYPE: FLUID DENSITY (LB/G): SURFACE TEMPERATURE (DEGF) : BOTTOM HOLE TEMPERATURE (DEGF) : FLUID SALINITY (PPM) : FLUID LEVEL (FT) : FLUID RATE AT WELLHEAD (BPM) : WATER CUTS (PCT) : GAS~OIL RATIO: CHOKE (DEG) : 6.500 14716.0 BRINE & DIESEL NEUTRON TOOL TOOL TYPE (EPITHERMAL OR THERMAL): MATRIX: MATRIX DENSITY: HOLE CORRECTION (IN): BLUELINE COUNT RATE NORMALIZATION IN OIL ZONE TOP NORMALIZING WINDOW (FT): BASE NORMALIZING WINDOW (FT): BLUELINE COUNT RATE SCALES SET BY FIELD ENGINEER FAR COUNT RATE LOW SCALE (CPS): FAR COUNT RATE HIGH SCALE (CPS): NEAR COUNT RATE LOW SCALE (CPS): NEAR COUNT RATE HIGH SCALE (CPS): TOOL STANDOFF (IN): REMARKS: LOG CORRELATED TO SPERRY SUN GR-EWR4 (5-21-97) AS PER CLIENT REQUEST. NO GEMCOS RUN ON TOOLSTRING DUE TO 4.5" TUBING. FIVE IN-LINE CENTRALIZERS RUN ON STRING MAX HOLE DEV. 60 DEG ECCENTRALIZATION AS GREAT AS .12" AFFECTED CET/CBT CET USED FOR COLLAR LOCATOR. $ LIS FORMAT DATA LIS Tape Verification Listing Schlumberger Alaska Computing Center 30-JUL-1997 09:40 PAGE: ** DATA FORMAT SPECIFICATION RECORD ** ** SET TYPE - 64EB ** TYPE REPR CODE VALUE 1 66 0 2 66 0 3 73 12 4 66 1 5 66 6 73 7 65 8 68 0.5 9 65 FT 11 66 85 12 68 13 66 0 14 65 FT 15 66 68 16 66 1 0 66 1 ** SET TYPE - CHAN ** NA~E SERV UNIT SERVICE API API API API FILE NUMB NUMB SIZE REPR PROCESS ID ORDER # LOG TYPE CLASS MOD NUMB SAMP ELEM CODE (HEX) DEPT FT 572289 O0 000 O0 0 2 1 1 4 68 0000000000 GR PS1 GAPI 572289 O0 000 O0 0 2 1 1 4 68 0000000000 TENS PS1 LB 572289 O0 000 O0 0 2 1 1 4 68 0000000000 ** DATA ** DEPT. 14694.000 GR.PS1 68.824 TENS.PSi 1904.000 DEPT. 14224.500 GR.PS1 91.597 TENS.PSi 4188.000 ** END OF DATA ** **** FILE TRAILER **** FILE NAME : EDIT .002 SERVICE : FLIC VERSION · O01CO1 DATE : 97/07/30 MAX REC SIZE : 1024 FILE TYPE : LO LAST FILE : LIS Tape Verification Listing Schlumberger Alaska Computing Center 30-JUL-1997 09:40 PAGE: **** TAPE TRAILER **** SERVICE NAME : EDIT DATE : 97/07/30 ORIGIN : FLIC TAPE NAME : 97330 CONTINUATION # : 1 PREVIOUS TAPE : CO~ViENT : ARCO ALASKA INC, POINT MCINTYRE, P2-19, API #50-029-22765-00 **** REEL TRAILER **** SERVICE NAME : EDIT DATE : 97/07/30 ORIGIN : FLIC REEL NAME : 97330 CONTINUATION # : PREVIOUS REEL : COM~ : ARCO ALASKA INC, POINT MCINTYRE, P2-19, API #50-029-22765-00