Department of Commerce, Community, and Economic Development
Alaska Oil and Gas Conservation Commission
Loading...
HomeMy WebLinkAbout197-040Pages NOT Scanned in this Well History File
XHVZE
This page identifies those items that were not scanned during the initial scanning Project.
They are available in the original file and viewable by direct inspection.
File Number of Well History File
PAGES TO DELETE
Complete
RESCAN
[] Color items - Pages:
GraYScale, halftones, pictures, graphs, charts -
Pages:
Poor Quality Original- Pages:
[] Other- Pages-
DIGITAL DATA
[] Diskettes, No.
Other, No/Type
'OVERSIZED
.Logs of various kinds
Other
COMMENTS:
Scanned by: Se~e~y M~d~.D'.rem. ~owal
Date: '-~///
TO RE-SCAN
Notes:
Re-Scanned by: Bevedy Mildred Daretha Nathan Lowell Date: /si
~
STATE OF ALASKA
ALASKA OIL AND GAS CONSERVATION COMMISSION
WELL COMPLETION OR RECOMPLETION REPORT AND LOG
No. of Completions
1a. Well Status: 0 Oil 0 Gas B Plugged B Abandoned 0 Suspended 0 WAG
20AAC25.105 20AAC 25110
CASING, LINER AND CEMENTING RECORD
.~~~~{~Jl':t==t~=~==~'
.". H4Ô "S~rf~~;- Suri~ce'P'115;~ 115'-' 24"
L-80 132' 9458' 132' 4653' 12-1/4"
L-80 9383' 16731' 4630' 7794' 8-1/2"
0 GINJ 0 WINJ 0 WDSPL
2. Operator Name:
BP Exploration (Alaska) Inc.
3. Address:
P.O. Box 196612, Anchorage, Alaska 99519-6612
4a. Location of Well (Governmental Section):
Surface:
2052' NSL, 2555' WEL, SEC. 06, T13N, R10E, UM
Top of Productive Horizon:
811' NSL, 3692' WEL, SEC. 28, T14N R10E, UM
Total Depth:
933' NSL, 3567' WEL, SEC. 28, T14N, R10E, UM
4b. Location of Well (State Base Plane Coordinates):
Surface: x- 542007 y- 6035505 Zone- ASP4
TPI: x- 551340 y- 6044882 Zone- ASP4
Total Depth: x- 551464 y- 6045004 Zone- ASP4
18. Directional Survey 0 Yes B No
21. Logs Run:
GR,CDR,CDN
22.
20"
9-5/8"
7"
91.1#
40#
26#
23. Perforations op.en to Production (MD + TVD of Top"" and
Bottom Interval, Size and Number; if none, state' none"):
None
MD
TVD
MD
Zero Other
5. Date Comp., Susp., or Aband. I
11/10/2003 1/
6. Date Spudded
03/09/1997
7. Date T.D. Reached
03/21/1997
8. KB Elevation (ft):
KBE = 40.80'
9. Plug Back Depth (MD+ TVD)
16648 + 7720
10. Total Depth (MD+TVD)
16750 + 7811
11. Depth where SSSV set
N/A MD
19. Water depth, if offshore
N/A MSL
1b. Well Class:
B Development 0 Exploratory
0 Stratigraphic Test 0 Service
12. Permit to Drill Number
197-040 303-302
13. API Number
50- 029-22747-00-00
14. Well Name and Number:
MPF.57
15. Field 1 Pool(s):
Milne Point Unit 1 Kuparuk River
Sands
Ft
Ft
16. Property Designation:
ADL 355017
17. Land Use Permit:
20. Thickness of Permafrost
1800' (Approx.)
'~;;ni~~~ ijl~~l~i~~Þ ,,~.i~~ ;i.~ Z.,~~~~
250 sx Arcticset I (Approx.)
2011 sx PF 'E', 800 sx Class 'G'
250 sx Class 'G'
GAs-McF
WATER-Bel
i24rj;~:::~g'~~('.~£}i;};ç;K~~;~:~?rri(JÑtlj:IÈ&é~{t~~~f' " '" .
SIZE DEPTH SET (MD) PACKER SET (MD)
4-1/2", 12.6#, L-80 16148' 16188' 16153'
TVD
'g~~;~~ð;~';~2~e;~~~~Mç~~\~iu:;i~M~,~C. :L~ . .' .
DEPTH INTERVAL (MD) AMOUNT & KIND OF MATERIAL USED
15451' Set EZSV with 25 Bbls 'G' cement above and below
9490' Set CIBP
9364' Set Cement Retainer placed 25 Bbls 'G" on top
9364' Set Whipstock
PRODUCTION TEST
Method of Operation (Flowing, Gas Lift, etc.):
N/A
Oil-Bel
.'
". ..
26.
Date First Production:
Not on Production
Date of Test Hours Tested PRODUCTION FOR
TEST PERIOD ..
Flow Tubing Casing Pressure CALCULATED ..
Press. 24-HoUR RATE
27. Brief description of lithology, porosity, fractures, apparent~~;: ~~~resence of oil, gas or wa~~(~ ~M¡~, if necessary).
No:Ubmit~~o;:.w::;\~e~--I..-.u!'\BFL MAR 2a - ~AR 18 ZOO
'\ ¥.O 'V'i\~(d~ ~o n. I G' I NAL fdt1'bJ c:: '. 1:'5" ~c.., G¡j;'~",'J~,;¡¡)n
~:\ Ano:f;Ù!~.~:'
Oil-Bel
Form 10-407 Revised 12/2003
GAs-McF
WATER-Bel
CONTINUED ON REVERSE SIDE
CHOKE SIZE I GAS-Oil RATIO
Oil GRAVITY-API (CORR)
(,y
28.
GEOLOGIC MARKERS
29.
FORMATION TESTS
NAME
MD
TVD
Include and briefly summarize test results. List intervals tested,
and attach detailed supporting data as necessary. If no tests
were conducted, state "None".
TKUP
16102'
7241'
None
TKA3
16352'
7457'
TKA2
16368'
7471'
TKA1
13695'
7495'
,"'" ,. . ,_... .,. . l' .t~' ,'oM"
;',;;;._:1 'o).,~¡,,;....>:
ï -... "v., \,./ ~..... ",' .
\1AR 1 8 ZOO'
A!tYkH ú:¡' r: -:0" ::>
A¡;¡:' ¡I'" f,~'
,.' .;;)n
30. List of Attachments:
Summary of Daily Drilling Reports
31. I hereby certify that the foregoing is true and correct to the best of my knowledge.
Signed sondra~ - Title Technical Assistant Date æ -if -0 c¡
MPF-57 197-040 303-302 Prepared By Name/Number: Sondra Stewman, 564-4750
Well Number Permit No.1 Approval No. Drilling Engineer: Matt Green, 564-5581
INSTRUCTIONS
GENERAL: This form is designed for submitting a complete and correct well completion report and log on all types of lands and leases in
Alaska.
ITEM 1a: Classification of Service Wells: Gas Injection, Water Injection, Water-Altemating-Gas Injection, Salt Water Disposal, Water
Supply for Injection, Observation, or Other. Multiple completion is defined as a well producing from more than one pool with
production from each pool completely segregated. Each segregated pool is a completion.
ITEM 4b: TPI (Top of Producing Interval).
The Kelly Bushing elevation in feet above mean low low water. Use same as reference for depth measurements given in other
spaces on this form and in any attachments.
ITEM 13: The API number reported to AOGCC must be 14 digits (ex: 50-029-20123-00-00).
ITEM 8:
ITEM 20: True vertical thickness.
ITEM 22: Attached supplemental records for this well should show the details of any multiple stage cementing and the location of the
cementing tool.
ITEM 23: If this well is completed for separate production from more than one interval (multiple completion), so state in item 1, and in
item 23 show the producing intervals for only the interval reported in item 26. (Submit a separate form for each additional
interval to be separately produced, showing the data pertinent to such interval).
ITEM 26: Method of Operation: Flowing, Gas Lift, Rod Pump, Hydraulic Pump, Submersible, Water Injection, Gas Injection, Shut-In, or
Other (explain).
ITEM 27: If no cores taken, indicate "None".
ITEM 29: List all test information. If none, state "Nonel1 R \ G \ N A l
Form 10-407 Revised 12/2003U ¡
BP EXPLORATION
Operations Summary Report
Page 1 of 10
Legal Well Name:
Common Well Name:
Event Name:
Contractor Name:
Rig Name:
MPF-57
MPF-57
REENTER+COMPLETE
DOYON DRILLING INC.
DOYON 14
Start: 9/24/2003
Rig Release: 11/30/2003
Rig Number: 14
Spud Date: 3/10/1997
End: 11/30/2003
Date From - To Hours Task Code NPT Phase Description of Operations
11/612003 12:00 -13:00 1.00 MOB P PRE Skid rig floor from drlg position to move position
13:00 - 14:00 1.00 MOB P PRE Move rig off well MPK-21A
14:00 - 17:00 3.00 MOB P PRE Install boosters front and back
17:00 -18:00 1.00 MOB P PRE Pick up and clean up pad
18:00 - 00:00 6.00 MOB P PRE Move rig from K-Pad to F-Pad road
11nJ2003 00:00 - 03:30 3.50 MOB P PRE Move rig from Milne PT and F-Pad road to F-Pad
03:30 - 11:00 7.50 MOB P PRE Take boosters off rig - lay herculite - Set rig mats - Prepare to
move rig over well MPF-57 A - (Well pressure @ 04:00 Hrs 620
psi) - Install heaters in sub - Install cellar doors on
11:00 - 13:00 2.00 MOB P PRE Move rig over well MPF-57A - Shim rig
13:00 -14:00 1.00 RIGU P PRE Skid rig floor from move position to drlg position
14:00 - 14:30 0.50 RIGU P PRE Rig up floor - Accept rig At 14:30 hrs 11nJ2003
14:30 - 16:00 1.50 RIGU P PRE Fill pits with 11 ppg mud - Rig up on tree and flow back tank for
well kill operations
16:00 - 16:30 0.50 RIGU P PRE Rig up lubricator - Pull BPV with DSM
16:30 - 17:30 1.00 RIGU P PRE Con't rig up lines for well kill operations
17:30 -18:00 0.50 RIGU P PRE Pre Spud meeting
18:00 - 23:30 5.50 RIGU P PRE Test lines to 2500 psi - Bullhead fluid @ 1.5 bpm pumped 9.4
bbls pressure @ 2500 psi and increasing - Shut down
bullheading - Displace tbg volume @ 3 bpm @ 550 psi - with
11 ppg mud - pump 84 bbls - Bullhead 11.1 bbls mud @ 1.5
bpm
Con't circulating out Annulus with 11 ppg mud @ 3 bpm ICP
770 psi FCP 2250 psi - last 800 stks increased pump to 3.5
bpm at 2700 psi
5216 stks mud back to surface 9.2 - Bypass flow tank - take
retums into pits through choke - Circulate additional 134 bbls
mud weight back 10.6+
23:30 - 00:00 0.50 RIGU P PRE Shut in choke - Bleed off pressure on tubing - monitor well
11/8/2003 00:00 - 00:30 0.50 RIGU P PRE Monitor well - No pressure build up on tubing or annulus - Well
dead - Pump 1.8 bbls fill annulus
00:30 - 01 :30 1.00 RIGU P PRE Rig down circulating lines I equipment
01 :30 - 02:30 1.00 RIGU P PRE Suck down lines I Tree - Install TWC - test from below 500 psi
02:30 - 03:30 1.00 RIGU P PRE Nipple down Tree - Adapter flange - check threads on hanger -
good
03:30 - 05:30 2.00 RIGU P PRE Nipple up BOP's - Riser - mud lines - choke lines
05:30 - 06:30 1.00 RIGU P PRE Rig up to test BOP's
06:30 - 11:30 5.00 BOPSURP PRE Annular 250 low 3500 high 5 mins each test - Top rams 250
low 3500 high 5 mins each test - Blind rams 250 low 3500 high
for 5 mins each test - Choke manifold - Hyd choke I Kill valves
- Manual choke I Kill valves - Floor valves - Upper I lower
IBOP valves - 250 low 3500 high 5 mins each test -
Accumulator test - Did not test lower rams - will test when out
of the hole with ESP - Witness of BOP test wavied by John
Crisp with AOGCC -
11:30 - 12:00 0.50 BOPSURP PRE Rig down testing equipment - shut annulus valves - Change
bails to long bails
12:00 - 13:00 1.00 PUll N STUC DECOMP Attempt to pull 2 7/8" tbg hanger to surface - Pull 150K tbg no
movement - Slack off - Start pumps @ 3.5 bpm at 2720 psi -
work tubing at 160K no movement - Pull to 175K no movement
13:00 - 18:00
5.00 PULL
N
STUC DECOMP Con't circulating @ 3.5 bpm at 3500 psi - Work tbg every 15
mins to 160K while waiting on lubricants
Printed 12/112003 95345 AM
BP EXPLORATION
Operations Summary Report
Page 2 of 10
Legal Well Name:
Common Well Name:
Event Name:
Contractor Name:
Rig Name:
MPF-57
MPF-57
REENTER+COMPLETE
DOYON DRILLING INC.
DOYON 14
Start: 9/24/2003
Rig Release: 11/30/2003
Rig Number: 14
Spud Date: 3/10/1997
End: 11/30/2003
Date From- To Hours Task Code NPT Phase Description of Operations
11/S/2003 1S:00 - 20:30 2.50 PULL P DECOMP Pump lubricants down hole - Con't working pipe - Pipe free -
PU 160K - SO 75K - Pull hanger to rig floor
20:30 - 21 :30 1.00 PULL P DECOMP Con't circulating while rig down to pull 2 7/S" ESP completion-
Circulate out lubricants from tubing into annulus
21 :30 - 23:30 2.00 PULL P DECOMP Break and lay down hanger - Landing joint - 1 10' pup - Rig up
Centerlift to spool ESP cable - Change out long bails for short
bails - Rig up double stack 2 7/S" tongs - PJSM with Centerlift
operator on pulling and spooling ESP cable - Pump dry job
23:30 - 00:00 0.50 PULL P DECOMP Lay down 2 7/S" tubing and ESP - Total joints laid down 20
11/912003 00:00 - 00:30 0.50 PULL P DECOMP PJSm With Centerlift operator - Tong operator - Crew on
spooling up ESP cable and laying down 2 7/S" tubing
00:30 - 09:30 9.00 PULL P DECOMP Lay down 2 7/S" tubing and ESP - Total 245 joints two joints
bad - galled threads - Box and Pin marked and flagged - Lay
down 1 GLM + 1 pup joint
09:30 - 10:30 1.00 PULL P DECOMP Install TIW valve - monitor well - String out highline power
cable with all rig hands
10:30 - 23:00 12.50 PULL P DECOMP Con't laying down 2 7/S" tubing with ESP cable - ESP cable
was damaged in one spot looked like armor had rubbed on
casing - marked with red paint - Laid down 507 joints of 2 7/S"
tubing - Recovered 3 flat clamps - 5 Protectolizers - 260 La
salle Clamps - Missing on La salle clamp per running program
23:00 - 00:00 1.00 PULL P DECOMP Break and lay down ESP pump assembly
11/10/2003 00:00 - 00:30 0.50 PULL P DECOMP Con't breaking and laying down ESP pump assembly
00:30 - 02:00 1.50 PXA P DECOMP Rig down tongs - Elevators - ESP cable - Centerlift sheeve -
Clear rig floor of stack tongs and all equipment not needed
02:00 - 03:00 1.00 PXA P DECOMP Rig up test equipment - Install test plug - Open annulus valves
- Test Upper Rams - Lower kelly valve on Top Drive - Lower
Rams - to 250 low 3S00 high for S mins each test - Recorded
on chart - Shut annulus valves - Pull test plug - Install wear ring
03:00 - 03:30 0.50 PXA P DECOMP Pick up 2 joints 4" DP - Pick up Halliburton Mechanical setting
tool - Halliburton 7" EZSV cement retainer - Make up same
03:30 - 16:00 12.S0 PXA P DECOMP RIH with Halliburton EZSV retainer on 4" DP from pipe shed -
Rabbit each joint picked up - RIH to 1610S'
16:00 - 17:00 1.00 PXA P DECOMP Circulate @ 3 bpm at 2500 psi prior to setting EZSV - Set
EZSV - Rotate 40 turns to the right - Tq SK - PU 240K to
release from EZSV and set element - Set 25K on EZSV to
insure packer set - PU off EZSV - Rotate 20 turns to the right to
extend stinger
17:00 - 19:00 2.00 PXA N DFAL DECOMP Attempt to test 7" casing to 3000 psi - No test leaking off -
Test surface equipment - Isolate # 2 pump - Test surface
equipment - Circulate hole - Attempt to test casing through kill
line with Howco valve on DP closed - Pump to 3200 psi - no
test leaking off - Open up Howco valve on DP - Attempt to test
through DP and Kill line 3000 psi - No test leaking off -
Establish injection rate .5 bpm at 3200 psi. Sting into EZSV -
Attempt to test DP X 7" annulus to 3000 psi - No test - Injection
rate same .5 bpm 3200 psi - Check 9 S/S" annulus - No
pressure on annulus
19:00 - 19:30 0.50 PXA N DFAL DECOMP Rig down test lines - Cement lines - Prepare to POH with
setting tool - Pump dry job
19:30 - 00:00 4.50 PXA N DFAL DECOMP POH for Howco 7" Champ packer
11/1112003 00:00 - 00:30 O.SO PXA N DFAL DECOMP Con't POH for Howco 7" Champ packer
Printed 12/1/2003 95345 AM
BP EXPLORATION
Operations Summary Report
Page 3 of 10
Legal Well Name:
Common Well Name:
Event Name:
Contractor Name:
Rig Name:
MPF-57
MPF-57
REENTER+COMPLETE
DOYON DRILLING INC.
DOYON 14
Start: 9/24/2003
Rig Release: 11/30/2003
Rig Number: 14
Spud Date: 3/10/1997
End: 11/30/2003
Date From - To Hours Task Code NPT Phase Description of Operations
11/11/2003 00:30 - 01 :00 0.50 PXA N DFAL DECOMP Break and lay down EZSV setting tool - Pick up - Make up 7"
Howco Champ packer
01:00 - 04:30 3.50 PXA N DFAL DECOMP RIH to 6043' - Set packer - Test 7" casing to 3000 psi - Good
test -
04:30 - 06:00 1.50 PXA N DFAL DECOMP Con't RIH with 7" Champ Packer to 8067' - Set packer - Test
casing to 3000 psi -
06:00 - 13:30 7.50 PXA N DFAL DECOMP Con't RIH with 7" Champ packer test csg at 10061 and 11982,
13978 and 16040 all good test, test backside @ 16040 to 3,000
psi for 30 min
13:30 - 20:30 7.00 PXA N DFAL DECOMP Slug pipe and tripping out with Champ packer, lay down same
23:30 - 00:00 0.50 PXA N DFAL DECOMP Pick EZSV star tool, tripping into 14,303
11/12/2003 00:00-01:00 1.00 PXA N DFAL DECOMP Tripping in with EZSV star tool to 16030
01:00 - 02:00 1.00 PXA N DFAL DECOMP Slip and cut Drilling line
02:00 - 03:00 1.00 PXA N DFAL DECOMP Change Bails and space out for cement job, P JSM
03:00 - 06:00 3.00 PXA N DFAL DECOMP Sting in to retainer and establish injection rate went to 3850 on
pipe, bleed off @ 100 psi every two min., bleed off pull out of
retainer circ,sting back in went to 3900 psi bleed off @ 100 psi
every 2 min.bleed off pull out of retainer circ,sting back in went
to 4000 psi bleed off @ 100 psi every 2 min., Bleed off pull out
and test csg above retainer to 3500 psi, bleed off 250 psi in 5
min.
06:00 - 08:00 2.00 PXA N DFAL DECOMP Circ and Condo mud for Balance cement plug
08:00 - 09:30 1.50 PXA N DFAL DECOMP Cement with Schlumberger with 5 bbls water, test lines to
4,000 psi, 6 bbls water, 25 bbls class G mixed @ 15.8, 5 bbls ,
displace with153 bbls mud., top of cement 15,451 after we pull
out
09:30 - 10:30 1.00 PXA P DECOMP Poh to 14,976
10:30-11:30 1.00 PXA P DECOMP Reverse circ. two drill pipe volumes, 5 bbls 1800 psi
11:30-12:00 0.50 PXA P DECOMP Change Bails
12:00 - 19:00 7.00 PXA P DECOMP Tripping out, lay down excess drill pipe
19:00 - 20:00 1.00 PXA P DECOMP Test 7" csg for 30 min with 3,000 psi, good test
20:00 - 00:00 4.00 PXA P DECOMP Pick up 7" CIBP, trip in to 9490
11/13/2003 00:00 - 00:30 0.50 PXA P DECOMP Set CIBP @ 9490', shear off with 175,000#
00:30 - 01 :00 0.50 PXA P DECOMP Pressure test csg to 3,000 psi for 15 min., tag top of plug to
Verify depth
01:00 - 05:00 4.00 PXA P DECOMP Slug pipe, Trip out with running tools, lay down same
05:00 - 09:30 4.50 PXA P DECOMP Pick up Baker mechanical csg cutter and 6 1/8 stab, Tripping in
09:30 - 10:30 1.00 PXA P DECOMP Attempt to cut csg @ 9385,100 rpms, 5K torque, suspect
broke cutters
10:30 - 14:00 3.50 PULL N DFAL DECOMP Poh with cutters, lay down same
14:00 - 14:30 0.50 PULL N DFAL DECOMP Pull wear ring, and 7 X 9 5/8 packoff
14:30 - 15:30 1.00 PULL N DFAL DECOMP M/u spear, stab in to 7" hanger, pull 400K an attemp to pull csg
free, csg not cut.
15:30 - 16:00 0.50 PULL N DFAL DECOMP Reinstall 7 x 9 5/8 packoff
16:00 - 20:00 4.00 PULL N DFAL DECOMP Pick up Baker mechanical csg cutter and 6 1/8 stab, Tripping in
20:00 - 21 :00 1.00 PULL N DFAL DECOMP Cutting csg @ 9383' 100 rpms, 5-7K torque, good flow back on
7 X 9 5/8 annulus
21 :00 - 23:30 2.50 PULL P DECOMP Tripping out with cutters,laydown same, letting diesel u-tube to
rockwasher, 60 bbls
23:30 - 00:00 0.50 PULL P DECOMP Pull 9 5/8 packoff
11/1412003 00:00 - 00:30 0.50 PULL P DECOMP MIU 7" spear and pull 7" csg to floor, with 230K P/U. free 190K
00:30 - 01 :00 0.50 PULL P DECOMP Lay down spear and csg hanger
01:00 - 01 :30 0.50 PULL P DECOMP Rig up to circ.
Printed 12/112003 9.53'45 AM
BP EXPLORATION
Operations Summary Report
Page 4 of 10
Legal Well Name:
Common Well Name:
Event Name:
Contractor Name:
Rig Name:
MPF-57
MPF-57
REENTER+COMPLETE
DOYON DRILLING INC.
DOYON 14
Start: 9/24/2003
Rig Release: 11/30/2003
Rig Number: 14
Spud Date: 3/10/1997
End: 11/30/2003
Date From - To Hours Task Code NPT Phase Description of Operations
11/14/2003 01 :30 - 03:00 1.50 PULL P DECOMP Circ and con. mud with 6 bbls min 600 psi, Rig up to lay down
7" csg
03:00 -13:30 10.50 PULL P DECOMP PJSM, lay down 7" csg, clear floor
13:30 - 14:00 0.50 PULL P DECOMP Install wear ring
14:00 - 15:00 1.00 PULL P DECOMP Pickup 8.5 MX-C1 bit and 9 5/8 csg scraper, service break
baker tools
15:00 -17:30 2.50 PULL P DECOMP Trip in with bit and scraper to 9383 tag cut jt.
17:30 - 18:30 1.00 PULL P DECOMP cut and slip drill line, circ slow
18:30 - 21 :30 3.00 PULL P DECOMP Circ and con mud to 10.2, 420 gals min 3350 psi worked pipe,
no rotation
21:30 - 00:00 2.50 PULL P DECOMP Slug pipe, laying down 4" drill pipe
11/1512003 00:00 - 03:00 3.00 PULL P DECOMP laying down 4" drill pipe, went off shore power @ 02:30 started
motors
03:00 - 03:30 0.50 PULL P DECOMP Break bit, scraper,bit sub,xo, lay down same
03:30 - 06:30 3.00 PULL P DECOMP PJSM, change out HT38 saver sub, for 41/2 IF
06:30 - 12:00 5.50 PULL P DECOMP Picking up 9.625 EZ-SV Cement retainer and 5" 19.5# S135
drill pipe, 28,500 make up
12:00 -12:30 0.50 PULL P DECOMP Service rig
12:30 - 16:30 4.00 PULL P DECOMP Finish picking up 5" drill pipe, tag up on cut jt. @ 9383 to verify
depth
16:30 - 17:00 0.50 PULL P DECOMP Pull up to 9364 and rig up to set EZ cement retainer
17:00 -18:00 1.00 PULL P DECOMP Circ clean packer setting depth, set EZSV retainer, shear off
with 215 K, 50K over string wt. and unsting from same
18:00 - 18:30 0.50 PULL P DECOMP Rig up and test csg and retainer to 1750 psi for 30 min.
18:30 - 19:00 0.50 PULL P DECOMP Sting in and establish injection rate, 1 bbl min. 1400 psi, 1.5
bbls=1500 psi, 2 bbls=1550 psi
19:00 -19:30 0.50 PULL P DECOMP Unsting and circ, PJSM with Schlumberger
19:30 - 21 :00 1.50 REMCM-P DECOMP Pump 5 bbls water, test lines to 3500 psi, 5 bbls water, 25 bbls
class G mixed @ 15.8, 3 bbls water, 124 bbls mud, pumped
cement in place with 6 bbls min 1500 psi, holding 700 psi on
backside, sting in and inject with 35 bbls mud, 2 bbls min. 1700
psi with annulus open
21 :00 - 22:00 1.00 REMCM-P DECOMP Unsting and reverse circ on top of retainer 2 drill pipe vol., 7
bbls min. 800 psi
22:00 - 00:00 2.00 PULL P DECOMP Slug pipe and tripping out with running tools
11/16/2003 00:00 - 02:30 2.50 PULL P DECOMP Tripping out with running tools, laying down same, clear floor
02:30 - 03:00 0.50 PULL P DECOMP Pull wear ring and install test plug
03:00 - 05:00 2.00 BOPSUE P DECOMP Change out upper rams to 4.5 x 7
05:00 - 09:30 4.50 BOPSUR P DECOMP Test Bops and manifold 250-3500 psi 5 min per test, Hydril
250-2,500 psi 5 min per test. the right to witness test was
wavier by Jeff Jones AOOGC, (top rams failed changed out)
09:30 - 10:00 0.50 BOPSURP DECOMP Pull test plug and install wear ring
10:00 - 13:30 3.50 PULL P DECOMP Picking up 6.125 dc and 5" hwdp and stand in derrick
13:30 - 16:00 2.50 PULL P DECOMP Picking up whipstock and 8.5 mills,Surface test MWD
16:00 - 19:30 3.50 STWHIP P DECOMP Tripping in with whipstock to 9,317
19:30 - 21 :00 1.50 STWHIP P DECOMP Orientate whipstock 68 degree to left of high side, and set @
9364' with 20K to set anchor, 50K to shear lug
21 :00 - 00:00 3.00 STWHIP P DECOMP Mill window from 9340 to 9,350 with 110 rpm , 550 gpm 2250
psi
11/17/2003 00:00 - 02:00 2.00 STWHIP P DECOMP Mill window from 9340 to 9356 with 120 rpm , 550 gpm 2250
psi
Drill open hole to 9,372' ( top window 9,340 bottom 9,356)
02:00 - 04:00 2.00 STWHIP P DECOMP Circ and work window, circ two bottoms up with 550 gals min.
PTinted 12/112003 95345 AM
BP EXPLORATION
Operations Summary Report
Page 5 of 10
Legal Well Name:
Common Well Name:
Event Name:
Contractor Name:
Rig Name:
MPF-57
MPF-57
REENTER+COMPLETE
DOYON DRILLING INC.
DOYON 14
Start: 9/24/2003
Rig Release: 11/30/2003
Rig Number: 14
Spud Date: 3/10/1997
End: 11/30/2003
Date
From - To Hours
Task Code NPT
Phase
Description of Operations
11/1712003 02:00 - 04:00 2.00 STWHIP P DECOMP 2250 psi
04:00 - 07:30 3.50 STWHIP P DECOMP Slug pipe and tripping out with Mills
07:30 - 09:30 2.00 STWHIP P DECOMP Lay down BHA ~-J'\..
09:30 - 10:30 1.00 STWHIP P DECOMP Clear floor, pick up Johnny Wacker was and flush BOP stack <51""Q:\¡ö(~
10:30 - 13:00 2.50 DRILL P INT1 Picking up BHA #2,8.5 MXC1 w/3x13 1x10 jets,7" SperryDrili
w/1.5 bend.Stab,float sub,flew DC,hang off collar,Stab,2 flex
DC,stab,12 HWP,Jars,5 HWP
13:00 - 18:30 5.50 DRILL P INT1 Tripping in picking up drill pipe 5' 19.5# S 135 from pipe shed,
18:30 - 19:00 0.50 DRILL P INT1 Orient and slide tru window, no problems
19:00 - 19:30 0.50 DRILL P INT1 Directional drill 9372 to 9376, circ for FIT
19:30 - 20:00 0.50 DRILL P INT1 FIT test with 9.5 MW, 9376 MD, 4630 TVD, 720 psi = 12.5
EMW
20:00 - 00:00 4.00 DRILL P INT1 Directional drill 9376' to 9,632' with 80 rpms, 450 gpm, 2400 psi
AST 1.67, ART 1.58 TO 7,000
11/18/2003 00:00 - 00:30 0.50 DRILL P INT1 Directional drill 9632' to 9,650' with 80 rpms, 450 gpm, 2400 psi
00:30 - 02:00 1.50 DRILL P INT1 Circ two bottoms up with, 450 gals min., 2200 psi, 80 rpms
02:00 - 03:00 1.00 DRILL P INT1 pump out to window @ 9356 with full drilling rate, pull tru
window with out pump.
03:00 - 06:30 3.50 DRILL P INT1 Flow check, slug pipe, Tripping out
06:30 - 08:30 2.00 DRILL P INT1 Stand back BHA, lay down stabs and mud motor
08:30 -11:00 2.50 DRILL P INT1 Pickup Geo-Pilot steerable assy., pressure test manifold to
3500psi, surface test MWD
11:00-14:00 3.00 DRILL P INT1 Tripping in to 7788'
14:00 - 15:30 1.50 DRILL P INT1 Cut and slip drill line, service top drive
15:30 - 18:30 3.00 DRILL P INT1 Tripping in to 9320, Mad pass from 8150 to 8450,9100 to 9320
18:30 - 19:00 0.50 DRILL P INT1 Orient and side tru window, no problems
19:00 - 20:00 1.00 DRILL P INT1 Mad pass to bottom and got ECD base line with 550 gals min
175 rpms was 11.0
20:00 - 00:00 4.00 DRILL P INT1 Directional drill 9,650' to 10231 with 175 rpms, 550 gpm, 2750
psiTO10-12K,ART2.5 ECD11.5
11/19/2003 00:00 - 17:00 17.00 DRILL P INT1 Directional drill 10,231' to 12056' with 175 rpms, 550 gpm,
3200 psi
ECD 12.2
17:00 - 17:30 0.50 DRILL P INT1 Mud out of balanced, circ,cond. ECD 12.0,Due to hole mud
dilution
17:30 - 22:00 4.50 DRILL P INT1 Directional drill 12056' to 12671' with 175 rpms, 550 gpm, 3200
psi
ECD 11.9ART 14.45 TO 10K
22:00 - 00:00 2.00 DRILL P INT1 Circ two bottoms up with 175 rpms, 550 GPM, 3200 psi, ECD
drop to 11.2, mud wt 9.1 down from 9.4
11/20/2003 00:00 - 04:00 4.00 DRILL P INT1 Pumped out to window @ 9,340, with full drilling rate, light drag
10-15,000 overpull, no packing off @ 11,540 to 11,450, stab
were going tru 8 degree dog leg, 10-15,00 drag 9950 to 9900,
20-25000 drag when bit came into csg
04:00 - 04:30 0.50 DRILL P INT1 Service top drive
04:30 - 06:00 1.50 DRILL P INT1 Trip back to bottom, wash last stand to bottom
06:00 - 11 :00 5.00 DRILL P INT1 Directional drill 12671' to 13,239 with 175 rpms, 600 gpm,
3600 psi ECD 11.3, dropping angle, drop 9 degrees with tool
straight
11 :00 - 13:00 2.00 DRILL N DFAL INT1 Circ two bottoms up with 600 gpm 3400 psi 175 rpms
(lost signal to GEO- tools)
13:00 - 16:00 3.00 DRILL N DFAL INT1 Pumped out to 11,065 with full drilling rate, pulled out from
11,065 to 9250 WID pump, no problems
PrInted 12/112003 95345 AM
Re: MPF-57A P&A 12Nov03
Subject: Re: .MPF-57A P&A 12Nov03
Date: Wed, 12 Nov 2003 14:39:48-0900 ~ ~.-- ~___.4 ~'l ... (~)~-~
From: Tom Maunder <tom_maunder@admin.state.ak.us>
To: "Dixon, Charles T (Fairweather)" <DixonCT@BP.com>
CC: "NSU, ADW Drlg Rig 14" <NSUADWDrlgRig14@BP.com>, "Archey, Pat" <ArcheyPJ@BP.com>,
"Miller, Mike E" <MillerME@BP.com>
Matt,
This is as we discussed early this morning. Hope the rest of the operation goes well.
Tom Maunder, PE
AOGCC
"Dixon, Charles T (Fairweather)" wrote:
> Tom,
> As discussed this morning (12Nov03), we were unable to establish an injection rate while both stung into and
above the EZSV packer set at 16,105-ft. 4,000-psi was applied when stung in and the pressure bled off lOOpsi/2-min.
The casing was tested to 3, 500-psi and the pressure bled off 250-psi/5-min. Instead off squeezing cement through
the EZSV we have now laid a 25-bbl balanced plug on top of the EZSV. We are currently POH and will test the
casing to 3, O00-psi for 30-min at surface.
> Cheers,
> Matt Green (from the rig - I will be back in the office on Friday)
Tom Maunder <tom maunderC, admin.state.ak.us>
Sr. Petroleum Engineer
Alaska Oil and Gas Conservation Commission
MPF-57 P&A
Subject: MPF-57 P&A
Date: Tue, 11 Nov 2003 17:17:45 -0900
From: "Green, Matt D" <GreenMD@BP.com>
To: "NSU, ADW Drlg Rig 14" <NSUADWDrlgRig14@BP.com>,
"Tom Maunder (E-mail)" <tom_maunder@admin.state.ak.us>
CC: "Archey, Pat" <ArcheyPJ@BP.com>, "Miller, Mike E" <MillerME@BP.com>
Tom,
As discussed with Jeff Jones, we have a leaking 7.0-in EZ-SV plug set at 16,105-ft. The casing test at 16,040-ft with
an RTTS packer was good. The plan forward is to sting back into the EZ-SV and pump 25-bbl cement, leaving 5-bbl
on top of the plug. We will test the casing again prior to running the upper 7.0-in bridge plug.
Please let us know if you see any problem the above procedure.
Cheers,
Matt
Re: MPF-57A P&A revision
,.
Subject: Re: MPF-57,~C;P&A revision
Date: Fri, 07 Nov 2003 06:47:51 -0900
From' Tom Maunder <tom_maunder@admin.state.ak.us>
To: "Green, Matt D" <GreenMD@BP.com>
CC: "Archey, Pat" <ArcheyPJ@BP.com>
Matt and Pat,
Your note confirms our discussion regarding the revision of you plans. The new plan meets the necessary
abandonment requirements and will likely make the start of the sidetrack easier to accomplish. I will put a copy of
this message in the well file.
Good luck.
Tom Maunder, PE
AOGCC
"Green, Matt D" wrote:
> Tom,
> As discussed, we would like to propose the following revision to the P&A of MPF-57A. Rather than cut and puli the
7.0-in casing below the 9.625-in casing shoe and set a balanced cement plug from which to kick-off, we would like to
do the following:
Set 7. O-in CIBP at 9,490-ft.
Cut 7.0-in casing at 9,438-fl and pull.
Run 9. 625-in EZ-SV packer to 9,410-ft and squeeze 25-bbl cement.
Run whipstock and mill window at 9,340-ft.
Drill 8. 5-in hole to TD as per original plan.
Thankyou for your consideration,
Cheers,
Matt.
i Tom Maunder <torn maunder@admin.state.ak.us>
Sr. Petroleum Engineer
Alaska Oil and Gas Conservation Commission
I of 1
11/7/2003 6:48 AM
(' STATE OF ALASKA "~
ALASKA OIL AND GAS CONSERVATION CO ~,,,,ISSION
APPLICATION FOR SUNDRY APPROVAL
20 AAC 25.280
1. Type of Request:
I~ Abandon [] Suspend [] Operation Shutdown [] Perforate ~ Vadance [] Other
[] Alter Casing [] Repair Well [] Plug Perforations [] Stimulate [] Time Extension Plug back for Sidetrack
[] Change Approved Program [] Pull Tubing [] Perforate New Pool [] Re-Enter Suspended Well [] Annular Disposal
2. Operator Name: 4. Current Well Class: 5. Permit To Drill Number
BP Exploration (Alaska) Inc. [] Development [] Exploratory 197-040
3. Address: [] Stratigraphic [] Service 6. APl Number:
P.O. Box 196612, Anchorage, Alaska 99519-6612 50-029-22747-00-00
7. KB Elevation (ft): KBE = 40.80' 9. Well Name and Number:
MPF-$7
8. Property Designation: 10. Field / Pool(s):
ADL 355017 Milne Point Unit / Kuparuk River Sands
11. ,, .... i:., :;,,ii' : ': .:; ': BRESEN'r WELL. COND'ITION'SUMMARY, :':
Total Depth MD (ft): Total Depth TVS (ft):l EffecUve Depth MD (ft): IEffective Depth TVD (ft): Plugs (measured): Junk (measu~'ed)':'
16750 7811I 16648I 7720 N/A 16648'
Casin~l. ' ,: ::.::.~.~en~l!h:,. :..: ~::.: ':: ;i:;;.' ?;:' :;:;;:,: :.::::M'D'~.: ::: i,.:i):.::::.;:?;~D:;;':.:;~::;~' ::;!,,::; ;;:,,:::; :.::. :Bur~t :..:.; .: :.: : Collapse
Structural
Conductor 115' 20" 115' 115'
Surface 9426' 9-5/8" 9458' 4653' 5750 3090
Intermediate
.. Production 16699' 7" 16731' 7794' 7240 5410
Liner
Perforation Depth MD (ft): I Perforation Depth TVD (ft):I Tubing Size: Tubing Grade: I Tubing MD (ft):
16370' - 16390' 7473' - 7491' 2-7/8", 6.5~; 4-1/2", 12.6# L-80 Surface to 16083'; 16148' to 16188'
Packers and SSSV Type: 7" Baker S-3 Packers and SSSV MD (ft): 16153'
.
,.
12. Attachments: 13. Well Class after proposed work:
[] Description Summary of Proposal [] BOP Sketch
[] Detailed Operations Program [] Exploratory [] Development [] Service
14. Estimated Date for 15. Well Status after proposed work:
Commencing Operations: October 11, 2003 [] Oil [] Gas [] Plugged [] Abandoned
16. Verbal Approval: Date: [] WAG [] GINJ [] WINJ [] WDSPL
Commission Representative:
17. I hereby certify that the foregoing is true and correct to the best of my knowledge. Contact Matt Green, 564-5581
Printed Name PatArchey Title Senior Drilling Engineer
,
Prepared By Name/Number:
Signature :'~'~'..~ (~,-,-~"~-},,,-¢' Phon~ ~..~--'~L'~ ;~ Date /¢'/ijI(2"~ SondraStewman, 564-4750
........... .. .... .... ...... ..... .... '"' ""' .... ''' ' ....... ' '"'" '" """' '"' "1", ' S~nd'r;'N'umber:. ____ '-~.-.._~,~...~'/_____)~-'~
Conditions of approval: Notify Commission so that a representative may witness
¢"~ ~ '~' ..... ,'"'"% '~"",'~ ~,] ,,r' '-,,~,' !,,.~
[] Plug Integrity '~BOP Test [] Mechanical Integrity Test [] Location Clearance ~ ',: '
Other: ~(~)~ ~-~t ~'~' c,,.'~ ~,,~,,~ ~'~:>(~'~ :~'"'~S
,~,
Subsequent form required 10- L.~) ~0~'~N~, 00T ._!. ,& 2003
' BY ORDER OF
~ApproVed By: ~ COMMISSIONER THE COMMISSION Date
Form 10-403 Revised 2/2003
RBDt
ORI61NAL
Submit In/ )licate
I'
DRILL & COMPLETION PROCEDURE
.~lilne Point MPF-57A Well Permit
Decompletion with Doyon-14
.
MIRU. NU BOPE and test.
Pull 2.875-in ESP completion.
P & A Kuparuk zone per AOGCC regulations.
Make mechanical cut at +/- 9,550-ft in 7.0-in casing. Pull and lay down.
Set cement plug from 7.0-in stub to 100-ft inside 9.625-in casing. WOC.
Drilling Procedure with Doyon-14
.
7.
8.
9.
10.
11.
12.
13.
14.
15.
16.
17.
18.
19.
20.
21.
TIH with drilling assembly. Test casing to 3,500-psi
Drill out cement and 20-ft new formation and perform FIT.
Drill 8.5-in hole as per directional plan.
Run and cement 7.0-in casing to TD.
Displace drilling mud to brine.
Perforate well.
Run 4.5-in frac string completion as per schematic.
Land tubing hanger and test.
Set BPV.
ND BOP.
Install and test tree.
Pull BPV.
Test 7"x 4-1/2" annulus.
Freeze protect both annuli.
Install BPV and secure well.
RD/MO.
Completion Procedure
22.
23.
24.
25.
26.
27.
28.
29.
MIRU Frac Equipment.
Frac A-Sand.
Open Sliding Sleeve and run Jet pump.
Flow well to clean-up.
MIRU 4ES.
Pull 4.5-in frac string.
Run 2.875-in ESP completion.
RD/MO
Tree: 2-9/16"- 5M ClW MPU F-57 Orig. DF Elev.: 40.8' (N 22E)
Wellhead: FMC 11" xl~ .... 3" Tbg. Orig,' Elev. = 12.1'
Hanger, 2-7/8 NSCT 3 ,250-4Pkt.-- · --=~ ...... DF 'F. csg. hng. = 27.9' (N 22E)
CIW - BPVT, 2-7/8" 8 rd. pup it. in
!
bttm. of hanger.
I .._. I
20" 91.1ppf, H-40 I 115' I ~) Howco95/8''ES'
Cementer
KOP @ 500' -- Camco 2-7/8" x 1" I 138'
Max. hole angle = 72 to 75 deg. sidepocket KBMM GLM
!
J
f/3650' to 14,000'
Hole angle thru' perfs = 28 deg.
I
9 5,8", 40 ppf, L-80 Btrc. I 9458' J ~
2 7/8" 'XU' Sliding Sleeve [ J
opens up (ID 2.313") 15,968'
2-7/8", 6.5#, L-80 8rd, BJE 2-7/8" XN nipple i 16,011'
(2.441" ID, Cap..00579 bbls/ft.) (ID 2.205")
7" 26 ppf, L-80, Btrc. prod. casing, l 1
( ddft ID= 6.151", cap. = 0.0383 bpf ) Pump, 159 stg. GCl150 16,025'
Tandem Gas Separator [ 16,045'1
(Intake 7,177' TVD)
Tandem Seal Section [ 16,050'
GSB3 DB UT/LT IL H6 PFS Aflas/HSN
Motor, 130 HP KME-1 [ 16,064,j
2145 volt, 35 amp
450 Series Phoenix MS11 J
w/6 fin Centralizer 16,083'
Tubing Cut at 16,148'
I
/
7" Baker S-3 packer [ 16153'
Stimulation
Summary
·
06/18/97 61 M# of 16-20 Carbolite
behind Ref log: pipe. SWS Formation GR/CCL screen 05/12/97 out.~
~' 4.5" HES XN nipple I 16176'
I
I
3.813"/3.75" no-go
Perforation Summary
.I
I
/ Baker shear out sub (5.22 odJI 16188'
Size SPF Interval (TVD) : Marker Jts 16,207'- 16,249' RKB
3 3/8' 6 16370'-16390' (7447'-7475')
24 gm RDX Big Hole @ 60 deg. phasing
(EHD = 0.56", TTP - 12.89")
Reperf for frac 4/29/01
Size SPF Interval (TVD)
4.5" 12 16370'-16380' (7447'- 7464') Fish: Baker shear out seat and
Sch 43CJ charge @ 135/45 deg. phasin~ ~ packer setting ball.
(END
0.77~
TTP
=
5.93")
7" float collar (PBTD) I 16648'
DATE REV. BY COMMENTS
03/25/97 JBF Drilled and Cased by Nabors 22E MILNE POINT UNIT
06/26/97 MDO ESP Completion 4-ES WELL F-57
10/29/97 JBF ESP Changeout by Nabors 4-ES APl NO: 50-029-22747
12/07/97 JBF ESP Replacement by Nabors 4-ES
05/02/01 M. Linder Recompleted for Frac and Jet Pump
06/22/01 B. Hasebe ESP Completion Nabors 4ES BP EXPLORATION (AK)
Tree: 2-9/16"- 5M CIW MPU F-57 ABANDONMENT Orig. DF Elev. = 40.8' (N 22E)
Wellhead: FMC 11"x ':" '~" Tbg. Orig :'" Elev. = 12.1'
Hanger, 2-7/8 NSCT ~[ ,250-4Pkt. ! DF ~ csa hna = 27 9' IN 22F_~
ClW - BPVT, 2-7/8" 8 rd. pup jt. in ~ "' "' '- ' -'
bttm. of hanger. I
· ~lI
20"91.1 ppf, H-40 I 115' I I ,) Howco 9 5/8"'ES'
I Cementer
KOP @ 500' I Camco 2-7/8" x 1" I I
Max. hole angle = 72 to 75 deg. ~ sidepocket KBMM GLM
f/Ref 3650'log.t° SWS 14'000'.GR/CCL ,05/12/97 I~.~. packer setting ball
Hole angle thru' parrs = 28 deg.
7" 26 ppf, L-80, Btrc.prod. casing, I
( ddft ID= 6.151", cap. = 0.0383 bpf )
7.0-in EZSV \ ~
Tubing Cut at 16,148'
7" Baker S 3 packer 16153
Stimulation Summary ~ - [16153' J
06/18/97 - 61 M# of 16-20 Carbolite ~
behind pipe. Formation screen out.
~ 4.5" HES XN nipple F' 16176,
~ 3.813-/3.75- no-go ' '
Perforation Summary '.. ,
~ Baker shear out sub (5.22 od~ 16188
Size ,SPF Interval, (TVD), I ~ Marker Jts 16,207' - 16,249' RKB
3 3/81 6 16370'-16390 (7447-7475')
24 gm RDX Big Hole @ 60 deg..p.h, asing II ~1
Reperf for frac 4/29/01 I ~ J
Size SPF Interval vo) I I---'---I
I Fish: Bakershearoutseatand
Sch 43CJ charge @ 135/45 deg' phasingl I ~ I ' '
(EHD 0 77, TTP 5 93 ) I ~ ,
DATE REV. BY COMMENTS
03/25/97 JBF Drilled and Cased by Nabors 22E MILNE POINT UNIT
06/26/97 MDO ESP Completion 4-ES WELL F-57
10/29/97 JBF ESP Changeout by Nabors 4-ES APl NO: 50-029-22747
12/07197 JBF ESP Replacement by Nabors 4-ES
05/02/01 M. Under Recompleted for Fmc and Jet Pump
06/22/01 B. Hasebe ESP Completion Nabors 4ES BP EXPLORATION (AK)
_· Orig. DF elev. = 40.80' (N22E)
Tree: 4-1/16"-5MFMC, PF-57A ProPose?
Wellhead: 11" x4.5" 5M G~ Odg. GL. elev.= 12.1'
W/4.5" TCll T&B Tubing H~,.~er -- ~
ClW "H" BPV profile
,4 i~ KOP @ 500'
20"
91
H-40
I 115' I Max hole angle in tubing = 71 degree
15 degrees at sleeve
i Camco 4.5" x 1" w/BK latch
sidepocket
KGB-2
GLM
I
9.625-in 40-1b/ft L-80 BTRC casing I 9458' I~ 'k
Sidetrack on Cement Plug at 9500'
7.0-in 26-1b/ft L-80 IBT-M casing
( ddft ID = 6.151", cap = 0.0383-bbl/ft )
4.5" 12.6# L-80 IBT-M tubing
= i Phoenix Discharge gauge (3.833-in drift
3.$" HES "XD" Dura sliding sleeve
I 3.813" ID (Opens down)
Phoenix Jet Pump gauge sensor
~ NOTE: ID change min. 3.833-1n
~ ~ / ~ 7.0" X 4.5" Baker Premier Packer 115,800'1
Perforated and frac Kuparuk A-sands
7.0-in Float Shoe 1~,28~'
DATE REV. BY COMMENTS MILNEPOINT UNIT
24-Sep-03 MDG Proposed Sidetrack Producer W E L L M P F-5 7 A
APl NO: 50-029-22747
BP EXPLORATION CAK)
RE: [Fwd: MPU F-57 Abandon]
,,
Subjeci: RE: [Fwd: MPU F-57 Abandon]
Date: Fri, 3 Oct 2003 15:53:09 -0500
From: "Archey, Pat" <ArcheyPJ@BP.com>
To: Tom Maunder <tom_maunder@admin.state.ak.us>
Tom,
Please see procedure and cement volume below for kick-off plug. Also, I
revised the permit statement noting that hydrocarbons will be encountered in
the Schrader (see attached). Please replace that page with the corrected
Drilling Hazards and Contingencies page. Let me know if you need anything
else.
After cutting and pulling 7" casing
1. RIH with 3.5-in stinger and lay 20-bbl of cement on top of CIBP at
9,600-ft (15.8-1b/gal class G cement) for TOC at 9,350-ft.
2. Pull up and circulate hole clean.
3. POOH.
4. PU enough additional 4.0-in HT-38 drill pipe to drill to TD.
5. PU 8.5-in bit, motor and BHA.
6. RIH and top of cement. Wait on cement as required for casing test
and integrity for kick-off.
7. Test 10-3/4" casing to 2,500-psi for 30 min. Record test on chart
and IADC.
Pat Archey
Sr. Drilling Engr.
Wk.-564-5803 Cell 240-8035
..... Original Message .....
From: Tom Maunder [mailto:tom maunder@admin.state.ak.us]
Sent: Thursday, October 02, 2003 1:02 PM
To: Archey, Pat
Subject: [Fwd: MPU F-57 Abandon]
Hi Pat,
I got Matt's out of office reply. Just a couple of easy questions.
I don't have Waiter's eddress.
Thanks.
Tom
MPF~57A Permit vi .0.ZIP
Name: MPF-57A Permit v1.0.ZIP
Type: Zip Compressed Data (application/x-zip-compressed)
Encoding: base64
1 of 1 10/3/2003 1:37 PrY
STATE OF ALASKA
ALASKA OIL AND GAS CONSERVATION COMMISSION
REPORT OF SUNDRY WELL OPERATIONS
1. Operations performed: Operation shutdown_ Stimulate _X Plugging_ Perforate_
FCO & ACI DIZE Pu~ tubing _ Alter casing _ Repair well _ Other_ FCO & ACIDIZE
2. Name of Operator
BP Exploration (Alaska), Inc.
3. Address
P. O. Box 196612
Anchorage, AK 99519-6612
4. Location of well at surface
2052' FSL, 2555' FEL, Sec. 06, T13N, R10E, UM
At top of productive interval
811' FSL, 1587' FWL, Sec. 28, T14N, R10E, UM
At effective depth
900' FSL, 1680' FEL, Sec. 28, T14N, R10E, UM
At total depth
932' FSL, 1712' FWL, Sec. 28, T14N, R10E, UM
5. Type of Well:
Development __X
Exploratow__
Stratigraphic__
Service__
(asp's 542007, 6035505)
(asp's n/a)
(asp's 551432, 6044972)
(asp's 551464, 6045004)
6. Datum elevation (DF or KB feet)
RKB 41 feet
7. Unit or Property name
Miline Point Unit
MPF-57
9. Permit number / approval number
197-040
10. APl number
50-029-22747
11. Field / Pool
Miline Point Unit / Kuparuk River Sands
12. Present well condition summary
Total depth: measured
true vertical
Effective depth: measured
true vertical
Casing Length
Conductor 115'
Surface 9326'
Production 16599'
16750 feet Plugs (measured)
7811 feet
16648 feet Junk (measured)
7720 feet
Size Cemented Measured Depth True Vertical Depth
20" 250 sx Arcticset (approx) 147' 147'
9-5/8" 2011 sx PF 'E', 800 sx 9458' 4653'
Class 'G'
7" 250 sx Class 'G' 16731' 7794'
Perforation depth: measured Open Perfs 16370'- 16390'
true vertical Open Perfs 74;73, - 7491' /;~iasl(a 0il & GasC01~s.-' Oomlfllss' ' 'or~
Anchorage
Tubing (size, grade, and measured depth) 2-7/8", 6.5 ppf, L-80 TBG - 16025' MD. 450 Series Phoenix MS1 w/6 fin Centralizer @ 16083'.
Tubing cut @ 16148'. Tubing section from 16148' to 16188'.
Packers & SSSV (type & measured depth) 7" x 4.5" BKR S-3 Packer @ 16153'. No SSSV in well.
·
13. Stimulation or cement squeeze summary
Intervals treated (measured) (see attached)
Treatment description including volumes used and final pressure
14.
Prior to well operation 08/23/2001
Subsequent to operation 10/08/2001
OiI-Bbl
341
Representative Daily Averaqe Production or Injection Data
Gas-Mcf Water-Bbl
53 59
428 84 165
Casing Pressure Tubing Pressure
ESP pump 401
ESP pump 303
15. Attachments
Copies of Logs and Surveys run __
Daily Report of Well Operations __
16. Status of well classification as:
Oil __X Gas __ Suspended __
Service
17. I hereby certify that the foregoing is true and correct to the best of my knowledge.
Title:
Technical
Assistant
DeWayne R. Schno ~,
Date October 09, 2001
Prepared by DeWayne R. Schnorr 564-5174
Form 10-404 Rev 06/15/88 ·
SUBMIT IN DUPLICATE
MPF-57
DESCRIPTION OF WORK COMPLETED
NRWO OPERATIONS
10/01/2001 PULL DPSOV, SET DGLV.
10/03/2001 ACID: FCO/ACID
EVENT SUMMARY
10/01/01 PULLED DPSOV @ 126' SLM. SET DGLV @ SAME DEPTH 126'.
10/O3/01
MIRU DS CTU #5. RIH AND JET DOWN TO TOP OF ESP. CIRC BOTTOMS UP.
TAG ESP AT 16038' CTMD. SQUEEZE 5 BBLS OF 90:10 DAD ACID, IN STAGES,
THROUGH ESP. PUMP START UP WAS SUCCESSFUL. BULLHEAD ADDITIONAL
32 BBLS ACID THROUGH PUMP TO FORMATION AT 0.2 BPM @ 3600 PSIG. LAY
REMAINING 18 BBLS ACID IN TUBING ON TOP OF ESP. POOH. RD DS CTU #5.
*** WELL HANDED OVER TO HB&R TO COMPLETE ACID DISPLACEMENT ***
FLUIDS PUMPED
BBLS ~DISCRIPTION
54 METHANOL
340 2% SLICK KCL WATER
55 i90:10 DAD ACID
439 TOTAL
Page 1
STATE OF ALASKA
ALASKA OIL AND GAS CONSERVATION COMIV,,,.,SION
REPORT OF SUNDRY WELL OPERATIONS
1. Operations performed: [] Operation Shutdown [] Stimulate [] Plugging [] Perforate
[] Pull Tubing [] Alter Casing [] Repair Well [] Other Change Out ESP
2. Name of Operator 5. Type of well: 6. Datum Elevation (DF or KB)
BP Exploration (Alaska) Inc. [] Development KBE = 40.80'
[] Exploratory 7. Unit or Property Name
3. Address [] Stratigraphic Milne Point Unit
P.O. Box 196612, Anchorage, Alaska 99519-6612 [] Service
4. Location of well at surface 8. Well Number
2052' NSL, 2555' WEL, SEC. 6, T13N, R10E, UM MPF-57
At top of productive interval 9. Permit Number / Approval No.
197-040
811' NSL, 1587' EWL, SEC. 28, T14N, R10E, UM 10. APl Number
At effective depth 50-029-22747-00
900' NSL, 1680' EWL, SEC. 28, T11.N, R10E, UM 11. Field and Pool
At total depth Milne Point Unit / Kuparuk River
932' NSL, 1712' EWL, SEC. 28, T14N, R10E, UM Sands
·
12. Present well condition summary
Total depth: measured 16750 feet Plugs (measured)
true vertical 7811 feet
Effective depth: measured 16648 feet Junk (measured)
true vertical 7720 feet
Casing Length Size Cemented M D TVD
Structural
Conductor 115' 20" 250 sx Arcticset I (Approx.) 115' 115'
Surface 9326' 9-5/8" 2011 sx PF 'E', 800 sx Class 'G' 9458' 4653'
Intermediate
Production 16599' 7" 250 sx Class 'G' 16731' 7794'
LinerRECEIVED
JUL 0 Z001
Perforation depth: measured 16370'- 16390'
Alaska Oil & Gas Cons. Commission
true vertical 7473' - 7491' Anchorage
Tubing (size, grade, and measured depth) 2-7/8", 6.5¢ L-80 EUE 8rd to 16083' and bit tubing from 16148' to 16188'
Packers and SSSV (type and measured depth) 7" Baker S-3 Packer set at 16153'
13. Stimulation or cement squeeze summary
Intervals treated (measured)
Treatment description including volumes used and final pressure
14. Representative Daily Average Production or Iniection Data
OiI-Bbl Gas-Mcf Water-Bbl Casing Pressure Tubing Pressure
Prior to well operation:
Subsequent to operation:
15. Attachments 16. Status of well classifications as:
[] Copies of Logs and Surveys run
[] Oil [] Gas [] Suspended Service
[] Daily Report of Well Operations
17. I hereby cer~.,., oi , .. correct to the best of my knowledge
Signed So~~.,,,,,.¢.._~_ Title Technical Assistant Date
Prepared By Name/Number: Sondra Stewrnan, 564-4750
o,,n NRIAlklAI Submit In Duplicat(~"
mary RePort
Legal Well Name: MPF-57
Common Well Name: MPF-57 Spud Date: 3/9/1997
Event Name: COMPLETION Start: 6/16/2001 End: 6/20/2001
Contractor Name: NABORS Rig Release: 6/20/2001
Rig Name: NABORS 4ES Rig Number:
~Dat~ ~From - To Hours Acti~i~ ~Code ~NPT ~Phase Description of
Operations
6/16/2001 100:00 - 00:30 0.50 MOB P I PRE MORU.
00:30 - 02:00 1.50 RIGU P PRE RIG UP. RAISE & SCOPE DERRICK.
02:00 - 03:30 1.50 RIGU P PRE TAKE ON FLUID. R/U HCR & HARD LINES.. TEST SAME TO
3500 PSI, OK.
03:30 - 04:30 1.00 WHSUR P DECOMP R/U LUBRICATOR & PULL BPV.
04:30 - 05:00 0.50 RIGU P DECOMP SET & BERM TIGER TANK.
05:00 - 07:30 2.50 KILL P DECOMP WEIGHT UP MUD TO 13.2 PPG.
07:30 - 12:30 5.00 KILL P DECOMP OPEN WELL SITP 1270 PSI, SICP 1250 PSI. KILL WELL @ 4
BPM W/13.2 PPG. MONITOR WELL. WELL DEAD.
12:30 - 13:00 0.50 WHSUR P DECOMP INSTALL TWC.
13:00 - 14:30 1.50 WHSUR P DECOMP N/D BOPE.
14:30- 17:00 2.50 BOPSUF:P DECOMP N/U BOPE.
17:00 - 19:30 2.50 BOPSUF.P DECOMP PRESSURE TEST BOPE. LP 250 PSI, HP 3500 PSI. BOP
TEST WINESSING WAIVED BY JEFF JONES W/AOGCC.
19:30 - 20:00 0.50 BOPSUF.P DECOMP DRAIN UP BOP STACK BID HARD LINES.
20:00 - 21:00 1.00 WHSUR ~ DECOMP R/U LUBRICATOR & PULL TWC.
21:00 - 23:00 2.00 PULL ~ DECOMP M/U LANDING JT. BOLDS. ATTEMPT TO PULL HANGER.
WORK TBG TO 185K. TBG STUCK.
23:00-00:00 1.00 PULL ~ DECOMP MIX EP LUBE & CIRCULATE WELL. PULLED150 K WHILE
CIRCULATING. TBG CAME FREE. L/D LANDING JT &
HANGER. FINISH CIRCULATING WELL. RECOVERED CON
TAMINATED MUD W/DIESEL & OIL. ALSO RECOVERED
SCALE ON TOP OF HANGER.
6/17/2001 00:00 - 04:00 4.00 PULL ~ ;DECOMP CIRCULATE WELL W/EP LUBEPULL & L/D HANGER.
04:00 - 05:00 1.00 PULL P DECOMP MONITOR WELL. MIX & PUMP WT PILL.
05:00 - 16:00 11.00 PULL P DECOMP POOH & L/D 4 1/2" FRAC STRING.
16:00 - 17:00 1.00 RUNCOkl= COMP R/D TOOLS FOR 4 1/2" TBG. CLEAR FLOOR. R/U TO RUN
ESP COMPLETION.
17:00 - 21:30 4.50 RUNCO~P COMP LOAD & TALLY 2 7/8" TBG. HPJSM. P/U & SERVICE ESP.
21:30 - 23:30 2.00 RUNCO~P COMP RESPOT ESP SPOOLING UNIT. PLUG IN MLE & TEST
i SAME.
23:30 - 00:00 0.50 RUNCOI~~ COMP RIH W/2 7/8" COMPLETION STRING.
6/18/2001 00:00 - 08:00 8.00 RUNCOI~ COMP RIH W/2 7/8" COMPLETION STRING TO 8000'.
08:00 - 11:30 3.50 RUNCOI~ COMP CHANGE REELS & SPLICE ESP CABLE.
11:30 - 16:00 4.50 RUNCOI~ COMP RIH W/2 7/8" COMPLETION STRING TO 13200'.
16:00 - 17:00 1.00 RUNCOI~ COMP TEST ESP, TESTED BAD. PJU TO POOH.
17:00 - 19:30 2.50 RUNCOI~ COMP CIRCULATE, MONITOR WELL. MIX & PUMP HEAVY PILL.
19:30 - 00:00 4.50 RUNCOI~ COMP POOH W/2 7/8" COMPLETION STRING.
6/19/2001 00:00 - 01:00 1.00 RUNCOI~ COMP POOH WI 2 7/8" COMPLETION.
01:00 - 02:00 1.00 RUNCOI~ COMP CHANGE OUT REELS TEST CABLE, NO GOOD.
02:00 - 08:00 6.00 RUNCOI~ esp COMP CON'T POOH W/2 7/8" COMPLETION.
08:00 - 14:00 6.00 RUNCOI~I COMP INSPECT ESP, FOUND BAD SPOT IN FLAT CABLE,
CHANGE REELS SPLICE NEW FLAT CABLE & PLUG IN &
TEST SAME.
14:00 - 00:00 10.00 RUNCOr~iN COMP RIH WITH ESP COMPLETION.
6/20/2001
00:00
- 02:30 2.50 RUNCOI~H COMP CONTINUE TO RIH WIHT COMP FROM DERRICK TO 13200'
02:30 - 05:00 2.50 RUNCOki~ COMP CONTINUE TO RUN IN HOLE PICKING SINGLES FROM
SHED.
05:00 - 08:00 3.00 RUNCOr~P COMP MU/HANGER & SPLICE ESP CABLE & LAND SAME &
TEST.
08:00 - 09:30 1.50 RUNCO COMP NIPPLE DOWN BOP
09:$0 - 12:00 2.50 RUNCOI~'~' COMP NIPPLE UP TREE & TEST SAME & SECURE AREA &
RELEASE RIG @ 1200 HRS. 6/20/2001
Printed: 6/26/2001 3:12:13 PM
.... STATE OF ALASKA
ALASK,. _.,IL AND GAS CONSERVATION COMIV,,,dSION
REPORT OF SUNDRY WELL OPERATIONS
1. Operations performed: [] Operation Shutdown [] Stimulate [] Plugging [] Perforate
[] Pull Tubing [] Alter Casing [] Repair Well [] Other Change Out ESP
2. Name of Operator 5. Type of well: 6. Datum Elevation (DF or KB)
BP Exploration (Alaska) Inc. [] Development KBE -- 40.80'
[] Exploratory 7. Unit or Property Name
3. Address [] Stratigraphic Milne Point Unit
P.O. Box 196612, Anchorage, Alaska 99519-6612 [] Service
4. Location of well at surface 8. Well Number
2052' NSL, 2555' WEL, SEC. 6, T13N, R10E, UM MPF-57
At top of productive interval 9. Permit Number / Approval No.
197-040
811' NSL, 1587' EWL, SEC. 28, T14N, R10E, UM 10. APl Number
At effective depth 50-029-22747-00
900' NSL, 1680' EWL, SEC. 28, T14N, R10E, UM 11. Field and Pool
At total depth Milne Point Unit / Kuparuk River
932' NSL, 1712' EWL, SEC. 28, T14N, R10E, UM Sands
12. Present well condition summary
Total depth: measured 16750 feet Plugs (measured)
true vertical 7811 feet
Effective depth: measured 16648 feet Junk (measured)
true vertical 7720 feet
Casing Length Size Cemented MD TVD
Structural
Conductor 115' 20" 250 sx Arcticset I (Approx.) 115' 115'
Surface 9326' 9-5/8" 2011 sx PF 'E', 800 sx Class 'G' 9458' 4653'
Intermediate
Production 16599' 7" 250 sx Class 'G' 16731' 7794'
Liner
Perforation depth: measured 16370'- 16390' RECEIVED
true vertical 7473' - 7491'
JUN 1 2
Tubing (size, grade, and measured depth) 4-1/2", 12.6#, L-80, NSCT & bit tubing to 16188'
Alaska 0il & Gas Cons. Commission
Anchorage
Packers and SSSV (type and measured depth) 7" Baker S-3 Hydro Set Packer at 16153'
13. Stimulation or cement squeeze summary
Intervals treated (measured)
Treatment description including volumes used and final pressure
14. Representative Daily Average Production or Injection Data
OiI-Bbl Gas-Mcf Water-Bbl Casing Pressure Tubing Pressure
Prior to well operation:
Subsequent to operation:
15. Attachments 16. Status of well classifications as:
[] Copies of Logs and Surveys run
[] Oil [] Gas [] Suspended Service
[] Daily Report of Well Operations
17. I hereby certify that the foregoin~ true and correct tO the best of my knowledge
Sign ~, _ c__~,~ Title Technical Assistant Date
Prepared By Name/Number: Sondra Stewrnan, 564-4750
Submit In Duplicate~~
Form 10-404 Rev. 06/15/88
O erations summary Report
Legal Well Name: MPF-57
Common Well Name: MPF-57 Spud Date: 3/9/1997
Event Name: SLOT RECOVERY Start: 4/22/2001 End: 5/3/2001
Contractor Name: NABORS Rig Release: 5/3/2001
Rig Name: NABORS 4ES Rig Number:
~/Date~ ~From:~ ~H0Urs~ Activity Code ~:NPT: Phase~ Description of Operations
4/23/2001 00:00 - 02:00 2.00 RIGU P PRE RIG UP ON MPF-57. RAISE 8, SCOPE DERRICK.
02:00 - 03:00 1.00 WHSUR P DECOMP PJU HARD LINES & HCR VALVE TO X-MAS TREE. PJU
TIGER TANK.
03:00 - 03:30 0.50 WHSUR P DECOMP PRESSURE TEST HARD LINES TO 3500 PSI, OK.
03:30 - 04:30 1.00 WHSUR P DECOMP R/U LUBRICATOR & PULL BPV.
04:30 - 14:30 10.00 WHSUR P DECOMP TAKE ON 12.8 PPG KILL FLUID, ONLY 1 TRUCK AVAILABLE
TO SERVICE RIG. WAITING 5+ HRS ON TRIPS.
14:30 - 17:00 2.50 KILL P DECOMP HOLD PJSM. SITP 1950 PSI, SICP 1950 PSI. START KILL
OPS. OPEN WELL & KILL @ 4 BPM. PUMPED 350 BBLS.
SD.
17:00 - 17:30 0.50 KILL P DECOMP CHECK TIGER TANK. 400 BBLS OIL. MONITOR WELL.
PULL OIL FROM TANK. SEND TO ORT.
17:30-18:00 0.50 KILL iP DECOMP CON'T KILL WELL. SD F/ CREW CHANGE & CHECK TIGER
TANK.
18:00 - 20:30 2.50 KILL P DECOMP HOLD SM W/NEW CREW. EMPTY TIGER TANK. FINISH
WELL CIRC W/12.8 PPG KILL FLUID. S/D MONITOR WELL.
AFTER I HR SITP & SICP 70 PSI.
20:30 - 00:00 3.50 KILL ~ DECOMP MONITOR WELL. WEIGHT UP MUD TO 13.2 PPG. SlTP &
SICP 170 PSI.
4/24/2001 00:00 - 02:30 2.50 KILL = DECOMP PUMP TBG. VOL. & SHUT IN AND SQZ. 50- BBL. 13.2 PPG.
AWAY.
02:30 - 04:30 2.00 KILL = DECOMP WT. UP MUD TO 13.2 PPG. & PUMP 105 BBL.
04:30 - 14:00 9.50 KILL P DECOMP WT. UP MUD IN PITS TO 13.2 & PUMP SAME & MONITOR
WELL & SAME STATIC.
14:00 - 14:30 0.50 WHSUR P DECOMP SETTWC
14:30 - 15:30 1.00 WHSUR P DECOMP NIPPLE DOWN TREE.
15:30 - 18:00 2.50 BOPSUF P DECOMP NIPPLE UP BOP
18:00 - 22:30 4.50 BOPSUF P DECOMP PRESSURE TEST BOP'S TO 250/3500 PSI. & RIG LUB &
PULL TWC. (TEST WAIVED BY AOGC CHUCK SHEVE)
22:30 - 23:30 1.00 PULL P DECOMP A'1-FEMPT TO PULL HANGER TO FLOOR & 80 % OF
TENSIL WAS WORKED WITH OUT PROGRESS BEING
MAKE & PUMP E-P LUBE.
4/25/2001 00:00 - 04:00 4.00 PULL ~ DECOMP CONTINUE TO MIX & CIRC EP MUD LUB IN MUD SYSTEM
AND TBG. BEGAIN TO MOVE AS EP LUB TURN CORNER &
CAME UP AND WET CSG. & LAY DN HANGER
04:00 - 00:00 20.00 PULL ~ DECOMP PULL ESP COMPLETION & RETRIEVE WIRELINE TOOLS
THAT WERE LOST IN TBG. & LAY DN SAME AND
CONTINUE TO LAY DN ESP ASSY
!4/26/2001 00:00 - 01:00 1.00 PULL = DECOMP LAY DOWN ESP COMPLETION
01:00 - 02:30 1.50 PULL P DECOMP CLEAN RIG FLOOR
02:30 - 05:00 2.50 WHSUR P DECOMP RIH WITH 150 JT.S TBG. & MU HES RTTS PKR. & SET 25'
BELOW WELL HEAD & TEST TO 1000 PSI.
05:00 - 07:30 2.50' BOPSUF P DECOMP NIPPLE DOWN BOP'S
07:30 - 09:30 2.00 WHSUR P DECOMP CHANGE OUT TBG. HEAD SPOOL
09:30- 11:30 2.00 WHSUR P DECOMP NIPPLE UP BOP
11:30 - 13:00 1.50 BOPSUF:P DECOMP TEST BOP' S TO 250 LOW & 3500 PSI.
13:00 - 15:00 2.00 CLEAN P DECOMP RELEASE PKR. & LAY DN SAME & CIRC. & LOAD PIPE
SHED WITH 3.5" DP.
15:00 - 00:00 9.00 CONS N PRE REPAIR ELMAGO BRAKE ON RIG.
4/27/2001 00:00 - 18:00 18.00 CLEAN N DECOMP REPAIR ELMAGO BRAKE (REPLACE BEARING)
18:00 - 19:30 1.50 CLEAN P DECOMP CUT DRLG. LINE
19:30- 00:00 4.50 CLEAN ~ DECOMP POOH LAYING DOWN 2-7/8" TBG.
4/28/2001 00:00 - 03:00 3.00 PULL ~ DECOMP CONTINUE TO LAY DOWN 2-7/8" TBG. & CLN-RIG FLOOR.
Printed: 5/24/2001 2:43:51 PM
OperatiOns sUmmary Report
Legal Well Name: MPF-57
Common Well Name: MPF-57 Spud Date: 3/9/1997
Event Name: SLOT RECOVERY Start: 4/22/2001 End: 5/3/2001
Contractor Name: NABORS Rig Release: 5/3/2001
Rig Name: NABORS 4ES Rig Number:
~?~te~i;' ~Fro~ ~To Hours :~iivi' :' C~de ~NPT ! phaSe
:~i:: ~:~ :: ~ ~ - ~:!~ ~: ~ ~: )~'?'~ ::~ ~: ~:: ~:~]::~ : Description of Operations
412812001 03:00 - 20:00 17.00 CLEAN P ~ DEGOMP MU BHA ~ 1 BIT & SC~PER SPACED 10-JTS. ABOVE BIT
& RIH TO 16603' STOPPED & LOAD & ST~P & CIRC.
ONCE FOR A TOTAL JTS. OF 531 PICK UP ~. 180 K
S~CK OFF 140 K)
20:00- 22:00 2.00 CLEAN P DEOOMP REVERSE CIRC. BOSOMS UP & PERFORM INJ. TEST. AT
~TE OF 1/4 BPM AT 3300 PSI.
22:00- 00:00 2.00 CLEAN P DECOMP POOH WITH BHA ~ 1 (WET PIPE)
412912001 00:00 - 08:00 8.00 CLaN P DECOMP CONTINUE TO POOH WITH BHA ~ 1 BIT & SC~PER
08:00 - 14:30 6.50 PERF P DECOMP MU 4.5" DP CONVEYED PERF GUN 10'/12-SPF & RIH TO
16380' & POSITION GUN..
14:30 - 00:00 9.50 PERF P DECOMP RIG SCHLUMBERGER & RIH WITH G~CCL INSIDE DP &
STOPPED ~ 3800' & STOPPED POOH & CHG. GREASE
HEAD TO FLOW TUBE & RIH.
4/30/2001 00:00 - 09:00 9.00 PERF P DEGOMP CONTINUE TO RIH & LOG GUNS INTO POSITION (VERY
SLOW WITH G~CCL. DUE TO WELL BORE GEOMETRY &
DENSII~ OF FLUIDS & YIELD POINT OF WELL BORE
FLUIDS.)
09:00 - 10:00 1.00 PERF ~ DEOOMP SPACE OUT GUNS & PRESSURE UP & FIRE SAME PERF.
INTERVAL 16370' TO 16380' GUN 4.5" HSD 12SPF 43CJ UP
19 gm RDX 0.77 ENT HOLE 5.93 PEN 7" 26~ CSG.
10:00 - 12:00 2.00 PERF ~ DEOOMP CIRCU~TE BOSOMS UP & MONITOR WELL BORE (NO
~INFLUX )
12:00 - 00:00 12.00 PULL 3 DECOMP POOH ~YING DOWN 3.5" DP & PERF. GUN & ~ SUB &
CIRC SUB.
5/1/2001 00:00 - 03:00 3.00 MOB P DECOMP CLEAN RIG FLOOR & RIG UP TO RUN 4.5" F~C STRING.
03:00 - 06:00 3.00 CASE P DEOOMP MAKE UP TAILPIPE ASSY. & DAMAGE PACKER ON PICK
UP AND HAD TO CHANGE OUT.
06:00 - 07:00 1.00 CASE P DEGOMP MAKE UP BAKER S-3 PKR.
07:00 - 10:00 3.00 CASE P DECOMP RIH WITH F~C STRING PICKING 4.5' FROM SHED.
10:00 - 10:30 0.50 CASE P DECOMP PUMP WEIGHTED PILL IN PIPE TO PREVENT RUNNING
OVER AS RUNNING PKR IN HOLE (HIGH YIELD & TUBING
CAPACI~ AS BEING THE PATH OF LEAST RESTRICTION
THE CAUSE OF FLUID TAKING THIS PATH.
10:30 - 14:00 3.50 CASE ~ DEGOMP RIH WITH 4.5" COMPLETION STRING TO 5200'
14:00 - 18:00 4.00 CASE ~ DEOOMP LOAD PIPE SHED WITH 4.5" TBG. & ST~P & DRIFT SAME.
18:00 - 00:00 6.00 CASE ~ ~DECOMP RIH WITH 4.5" F~C STRING.
51212001 00:00 - 05:00 5.00 CASE ~ DECOMP RIH WITH 4.5" F~C STRIG TO 13666'
05:00 - 06:30 1.50 CASE ~ : DECOMP LOAD PIPE SHED WITH 4.5" TBG. & ST~P & DRIFT.
06:30 - 10:00 3.50 CASE P DECOMP RIH WITH 4.5" F~C STRING & PKR TO SE~ING DEPTH
OF 16289' MU HANGER & SPACE OUT AND ~ND
HANGER.
10:00-11:00 1.00 WHSUR P DECOMP SET ~C & TEST SAME.
11:00- 13:00 2.00 BOPSUF P DECOMP NIPPLE DOWN BOP'S
13:00 - 15:00 2.00 WHSUR P DECOMP NIPPLE UP TREE & TEST SAME TO 5000 PSI.
15:00 - 15:30 0.50 WHSUR P DECOMP RIG LUBRICATOR & PULL ~C
15:30 - 22:30 7.00 DHEQP P DECOMP DISP~CE 13.2 PPG. BRINE OUT OF WELL BORE WITH 8.5
PPG. SEAWATER
22:30 - 00:00 1.50 DHEQP P DEGOMP RIG HB&R & FREEZE PROTECT ANNULUS WITH 35-BBL.
METHANOL
51312001 00:00 - 04:00 4.00 DHEQP ~ DECOMP DROP PACKER SE~ING BALL AND A~EMPT TO PUT ON
SET BY PUMPING DIESEL DN TBG. ~ 1/4 BPM 3600 PSI.
(NO EFFECTIVE )
Printed: 5/24/2001 2:43:51 PM
peration SUmmarY Report
Legal Well Name: MPF-57
Common Well Name: MPF-57 Spud Date: 3/9/1997
Event Name: SLOT RECOVERY Start: 4/22/2001 End: 5/3/2001
Contractor Name: NABORS Rig Release: 5/3/2001
Rig Name: NABORS 4ES Rig Number:
~ate~it~Fro~i:~ T°' ~H~FS r;ActivitYlCode ;NP~!7 phase: Description of Operations
5/3/2001 04:00 - 07:30 3.50 DHEQP P DECOMP RIG HES SLICK LINE & RIH WITH BRUSH TO GLM ~ 2440'
& BRUSH GLM & POOH
07:30-10:00 2.50 DHEQP P DECOMP RIH WITH W 3.45" GR & ROLLER BAR ASSY TO16150'
(WLM) & POOH & RIG DN HES.
10:00 - 12:30 2.50 DHEQP P DECOMP RIG UP HB&R & SET PACKER TO 4000 PSI. & TEST
ANNULUS TO 4000 PSI. & SHEAR OUT SHEAR OUT SUB
AT 4800 PSI. & RIG DN HB&R
12:30 - 14:00 1.50 WHSUR P DECOMP RIG LUBRICATOR & SET ~C. WITH 1450 PSI. ON TBG &
1600 PSI. ON ANNULUS. SECURE TREE AREA AND
RELEASE RIG. ~ 1400 HRS. 5/3/2001
!
Printed: 5/24/2001 2:43:51 PM
.l---... STATE OF ALASKA
ALASI' L AND GAS CONSERVATION CON,.
REPORT OF SUNDRY WELL OPERATIONS
SION
1. Operations performed: [] Operation Shutdown [] Stimulate [] Plugging [] Perforate
[] Pull Tubing [] Alter Casing [] Repair Well [] Other Fishing Slickline - Tubing Puncher
2. Name of Operator 5. Type of well: 6. Datum Elevation (DF or KB)
BP Exploration (Alaska) Inc. [] Development RTE = 53'
[] Exploratory 7. Unit or Property Name
3. Address [] Stratigraphic Milne Point Unit
P.O. Box 196612, Anchorage, Alaska 99519-6612 [] Service
4. Location of well at surface 8. Well Number
2052' NSL, 2555' WEL, SEC. 6, T13N, R10E MPF-57
At top of productive interval 9. Permit Number / Approval No.
197-040
811' NSL, 1587' EWL, SEC. 28, T14N, R10E 10. APl Number
At effective depth 50-029-22747
900' NSL, 1680' EWL, SEC. 28, T14N, R10E 11. Field and Pool
At total depth Milne Point Unit / Kuparuk River
932' NSL, 1712' EWL, SEC. 28, T14N, R10E Sands
12. Present well condition summary
Total depth: measured 16750 feet Plugs (measured)
true vertical 7823 feet
Effective depth: measured 16648 feet Junk (measured)
true vertical 7732 feet
Casing Length Size Cemented MD TVD
Structural
Conductor 115' 20" 250 sx Arcticset I (Approx.) 115' 115'
Surface 9426' 9-5/8" 2011 sx PF 'E', 800 sx Class 'G' 9458' 4653'
Intermediate
Production 16699' 7" 250 sx Class 'G' 16731' 7794'
Liner
Perforation depth: measured 16370'- 16390' i-'~':;,~
.....
true vertical 7473' - 7491'
Tubing (size, grade, and measured depth) 2-7/8", 6.5#, L-80, 8rd EUE tubing to 16206'
Packers and SSSV (type and measured depth) None
13. Stimulation or cement squeeze summary See Attachment
Intervals treated (measured)
Treatment description including volumes used and final pressure
i4. '" Representative Daily A;v'erage Production or Iniection Data
OiI-Bbl Gas-Mcf Water-Bbl Casing Pressure Tubing Pressure
Prior to well operation:
Subsequent to operation:
15. Attachments 16. Status of well classifications as:
[] Copies of Logs and Surveys run
[] Oil [] Gas [] Suspended Service
[] Daily Report of Well Operations
17. I hereby certify that the foregoing is true and correct to the best of my knowledge
Signed Michael Williams ~b--/'"'~ ~11 y~ Title Technical Assistant III Date
;;';::i: ;; : :: : ~" ':, i :: :; ::i ; : Prepared By Name/Number: De'[/1/ayneSchnorr564-5174
Form 10-404 Rev. 06/15/88
Submit In Duplicate
04/04/2001
MPF-57
DESCRIPTION OF WORK COMPLETED
NRWO OPERATIONS
MISC-NRWO - FISH FOR SLICKLINE - TUBING PUNCHERS
SUMMARY
MIRU DOWELL-SLB CTU #5 AND MILNE PT. HALLIBURTON SL UNIT. LATCH
SL FISH @ 210' (CTM) AND RETRIEVE 10' OF BALLED/TWISTED WIRE.
ENGAGE/GRAB WIRE @ 218' (CTM). PULL TO SURFACE AND CLOSE SL
BOPE. DISCONNECT COIL FROM SL FISH ON SURFACE. ATTACH WIRE TO
SL UNIT AND SPOOL WIRE. >>>RETRIEVE 15,800' OF 0.125" WIRE<<<
**TOOLSTRING AND CUTTER BAR LEFT IN WELL.** ***TURN WELL OVER
TO MILNE WIRELINE COORDINATOR***
RIH WITH 2 FT TUBING PUNCH. (4 SPF 0 PHASING). SHOOT HOLES AT
14852CTMD. GOOD INDICATION THAT SHOTS FIRED. POH. WELL STAYS
ON PRODUCTION
Fluids Pumped
BBLS. Description
45 60/40 METHANOL
37 MEOH
82 Total
ADD PERFS - TUBING PUNCHER
04/04/2001
SUMMARY
The following interval was perforated using one SWS 2', 1-11/16" tubing puncher
gun, 4 SPF, 0 degree phasing.
14852 - 14854 CTMD
PERMIT DATA
AOGCC Individual Well
Geological Materials Inventory
T DATA PLUS
Page: 1
Date: 05/24/99
T
/
RUN RECVD D
..............
97-040 GR/CCL
97-040 CDR-MD
97-040 ~_DN-MD
97-040 A/DN-TVD
97-040 CDR-TVD
97-040 7729
97-040 PERF
97-040 MMS SRVY
97-040 DIR SRVY
97-040 GYRO MULTI SHOT /~/GYRODATA
j9200-16560
· ~'40_ 16700
~350-16650
~'600-7750
~/~0- 7750
~/S CHLUM LWD GR/CDR/ADN
~16370-16390
~PERRY 9652.77-16604
M 0-16750
0-16534
FINAL 06/26/97
FINAL 06/26/97
FINAL 06/26/97
FINAL 06/26/97
FINAL 06/26/97
1 06/26/97
FIANL 07/03/97
08/29/97
SCHLU 08/29/97
SCHLU 08/29/97
10-407 ~R//COMPLETION DATE @ ~/~/I~?I
/
DAILY WELL OPS /R @~/~/~7/ TO
Are dry ditch samples required? yes ~_~And received?
Was the well cored? yes ~Analysis & description received?
Are well tests required? yes ~Received?
Well is in compliance
In~tial
COMMENTS
BOX
,
STATE OF ALASKA
ALASK/--~ O,,_ AND GAS CONSERVATION COMN,,,.SSION
REPORT OF SUNDRY WELL OPERATIONS
1. Operations performed:
[]Operation Shutdown []Stimulate
[] Pull Tubing l--lAIter Casing
2. Name of Operator
BP Exploration (Alaska)Inc.
3. Address
P.O. Box 196612, Anchorage, Alaska 99519-6612
4. Location of well at surface
2052' NSL, 2555' WEL, SEC. 6, T13N, R10E
At top of productive interval
811' NSL, 1587' EWL, SEC. 28, T14N, R10E
At effective depth
900' NSL, 1680' EWL, SEC. 28, T14N, R10E
At total depth
932' NSL, 1712' EWL, SEC. 28, T14N, R10E
12. Present well condition summary
[] Plugging [] Perforate
[] Repair Well [] Other Change Out ESP
5. Type of well:
[] Development
[] Exploratory
[] Stratigraphic
I~lService
6. Datum Elevation (DF or KB)
RTE = 53'
7. Unit or Property Name
Milne Point Unit
8. Well Number
MPF-57
9. Permit Number / Approval No.
97-40
10. APl Number
50-029-22747
11. Field and Pool
Milne Point Unit / Kuparuk River
Sands ~.. ;' ,'," ~ !~ ~i' ~'.'-' !!.i!
¢.7 ';"": .... 5...~ '~ ~L.,
Total depth: measured 16750 feet
true vertical 7823 feet
Effective depth: measured 16648 feet
true vertical 7732 feet
Casing Length
Structural
Conductor
Surface
Intermediate
Production
Liner
Size
115' 20"
9426' 9-5/8"
Plugs (measured)
Junk (measured)
0 R ! G!',
"~ ~. r, '/'".. !~
, . ~.~,, !~. I-:..~?.tj~;,':-~' ~, .........
Cemented MD ~D
250 sx Arcticset I (Approx.)
2011 sx PF 'E', 800 sx Class 'G'
16699' 7" 250 sx Class 'G'
115' 115'
9458' 4653'
16731' 7794'
Perforation depth: measured 16370'-16390'
true vertical 7473'-7491'
Tubing (size, grade, and measured depth) 2-7/8", 6.5#, L-80, 8rd EUE tubing to 16206'
Packers and SSSV (type and measured depth) None
13. Stimulation or cement squeeze summary
Intervals treated (measured)
Treatment description including volumes used and final pressure
14.
Representative Daily Average Production or Injection Data
Oil-Bbl Gas-Mcf Water-Bbl
Casing Pressure Tubing Pressure
Prior to well operation:
Subsequent to operation:
15. Attachments I16. Status of well classifications as:
[] Copies of Logs and Surveys run I [] Oil [] Gas [] Suspended
[] Daily Report of Well Operations
17. I hereby certify that the f.gregoing ~rrect to the best of my knowledge
Signed
Terrie Hubble - ~'~/),~ Title Technical Assistant III
_ .
Prepared By Name/Number:
Submit In Duplicat~
Service
Form 10-404 Rev. 06/15/88
Progress Report
Facility M Pt F Pad
Well MPF-57
Rig Nabors 5S
Page 1
Date 10 February 99
Date/Time
09 Jul 98 06:00-07:00
07:00-08:30
08:30-14:00
14:00-21:00
21:00-23:00
23:00-06:00
10 Jul 98 06:00-15:00
15:00-18:00
18:00-04:00
11Ju198 04:00-06:00
06:00-11:00
11:00-18:00
18:00-22:00
22:00-06:00
12 Jul 98 06:00-07:30
07:30-16:30
16:30-22:00
22:00-06:00
13 Jul 98 06:00-18:00
18:00-06:00
14 Jul 98 06:00-09:00
Duration
lhr
1-1/2 hr
5-1/2 hr
7hr
2hr
7hr
9hr
3hr
10hr
2hr
5hr
7hr
4hr
8hr
1-1/2 hr
9hr
5-1/2 hr
8hr
12 hr
12 hr
3hr
Activity
Rig moved 100.00 %
Rigged up High pressure lines
Circulated at 0.0 ft
Circulated at 0.0 ft
Circulated at 0.0 ft
Reverse circulated at
Reverse circulated at
Reverse circulated at
Reverse circulated at
Investigated pressure
Investigated pressure
Investigated pressure
Reverse circulated at
Investigated pressure
Investigated pressure
Investigated pressure
Reverse circulated at
Investigated pressure
Investigated pressure
Rig moved 0.00 %
Rig moved 0.00 %
16120.0 ft
16120.0 ft
16120.0 ft
16120.0 ft
change
change
change
16120.0 ft
change
change
change
16120.0 ft
change
change
STATE OF ALASKA
ALASr,,A OIL AND GAS CONSERVATION COMMISSION
REPORT OF SUNDRY WELL OPERATIONS
1. Operations performed: []Operation Shutdown []Stimulate [] Plugging [] Perforate
[] Pull Tubing []Alter Casing [] Repair Well [] Other ESP Exchange
2. Name of Operator
BP Exploration (Alaska) Inc.
3. Address
P.O. Box 196612, Anchorage, Alaska 99519-6612'
5. Type of well:
[] Development
[] Exploratory
[] Stratigraphic
6. Datum Elevation (DF or KBE)
RTE = 53'
[] Service
7. Unit or Property Name
Milne Point Unit
4. Location of well at surface 8.
2052' NSL, 2555' WEL, Sec. 6, T13N, R10E, UM
At top of productive interval
671' NSL, 1549' EWL, Sec. 28, T14N, R10F, UM
At effective depth
757' NSL, 1643' EWL, Sec. 28, T14N, R10E, UM
At total depth
781' NSL, 1669' EWL, Sec. 28, T14N, R10E, UM
Well Number
MPF-57
9. Permit Number / Approval No.
97-40
10. APl Number
50- 029-22747
11. Field and Pool
Milne Point Unit / Kuparuk River
Sands
12. Present well condition summary
Total depth: measured
true vertical
Effective depth: measured
true vertical
Casing
Structural
Conductor
Surface
Intermediate
Production
Liner
16731' feet Plugs (measured)
7780' feet
16648' feet Junk (measured)
7732' feet
Length Size
115' 20"
9326' 9 5/8"
16599' 7"
Cemented
250 sx Arcticset 1 (approx)
2011 sx PF 'E', 800 sx 'G'
250 sx Class 'G'
MD TVD
115' 115'
9458' 4636'
16731' 7780'
Perforation depth: measured
16370'-16390'
true vertical 7485'-7503'
Tubing (size, grade, and measured depth)
2 7/8" 6.5# L-80 to 16206'
Packers and SSV (type and measured depth) None
13. Stimulation or cement squeeze summary
Intervals treated (measured)
Treatment description including volumes used and final pressure
14.
Prior to well operation:
Subsequent to operation:
Representative Daily Average Production or Injection Data
Oil-Bbl Gas-Mcf Water-Bbl
Casing Pressure
Tubing Pressure
15. Attachments [] Copies of Logs and Surveys run
[] Daily Report of Well Operations
16. Status of well classifications as:
[] Oil [] Gas [] Suspended
Service
17. I hereby certify that the foregoing is true and correct to the best of my knowledge
Signed Chip Alvord ,/~/.._ ~/ ¢'~,'~ Title Engineering Supervisor Date ~/~[fl~
/ Prepared By Name/Number: Mary Youngers 564-5242
Form 10-404 Rev. 06/15/88
Submit In Du~
Facility
M Pt F Pad
Progress Report
Well MPF-57 Page
Rig Nabors 5S Date
1
17 February 98
Date/Time
26 Oct 97
27 Oct 97
28 Oct 97
29 Oct 97
29 Nov 97
30 Nov 97
11:00
15:30
17:00
18:00
20:00
00:30
07:00
08:00
09:00
12:00
13:30
18:00
03:30
06:00
09:00
15:30
18:00
20:30
04:00
06:00
06:30
07:00
08:30
09:30
11:00
13:00
09:00
10:30
11:30
13:30
15:00
16:30
19:30
20:30
22:30
23:00
05:00
Duration
Activity
Equipment work completed
Equipment work completed
Equipment work completed
Completed operations
Work completed - Rig equipment in position
Crew change @ 18:00 hrs. Hold safety meeting and
PJSM. Prepare to kill well.
Stopped: To flowcheck well
Monitior well. WHP 100 psi. Prepare to increase
brine weight.
Hole displaced with Brine - 100.00 % displaced
Equipment work completed
Equipment work completed
Pressure test completed successfully - 5000.000 psi
Test BOPE at 250/5000. Annular at 250/3000.
Stopped: To flowcheck well
Prepare to pull completion.
Stopped: To hold safety meeting
Crew change.
Electrical submersible pumps laid out
Clear floor. Prepare for Slick-line operations.
Stopped: To hold safety meeting
Crew change.
Slick line operations continues.
Completed run with Toolstring from -20.0 ft to 16340.0 ft
Equipment work completed
Stopped: To hold safety meeting
Crew change.
Stopped: To splice cable
Change spool and make splice.
Stopped: To splice cable
Stopped: To hold safety meeting
Crew change.
Stopped: To splice cable
Splice completed.
Equipment work completed
Equipment work completed
Equipment work completed
Centfilift perform final cable check. Good.
Stopped: To hold safety meeting
Hold pre-rig down safety meeting.
Rig off station
Release Rig at 13:00 hrs.
At well location - Slot
Completed operations
Completed operations
Equipment work completed
Equipment work completed
Equipment work completed
Equipment work completed
Function test completed satisfactorily
Stopped: To flowcheck well
Observed well static
Stopped: To flowcheck well
Facility
M Pt F Pad
Progress Report
Well MPF-57 Page 2
Rig Nabors 5S Date 17 February 98
Date/Time
01 Dec 97
02 Dec 97
03 Dec 97
04 Dec 97
05:15
06:00
14:00
14:30
15:00
15:30
21:30
01:00
01:30
03:00
05:00
06:00
06:30
11:00
14:30
17:30
19:30
20:30
21:00
21:30
22:30
00:00
05:00
06:00
06:30
09:00
10:30
11:00
11:30
13:30
14:00
19:30
21:00
01:30
03:30
04:00
06:00
06:30
07:00
11:30
12:00
15:00
22:30
23:00
00:30
01:30
02:00
03:30
04:00
05:30
06:00
08:00
09:00
Duration
Activity
Observed pressures - string: 0.000 psi, annulus: 500.000 psi
Stopped: To hold safety meeting
Hole displaced with Brine - 110.00 % displaced
Shut in well at 70.0 psi
Stopped: To flowcheck well
Observed pressures - string: 80.000 psi, annulus: 80.000 psi
Completed operations
Stopped: To flowcheck well
Observed pressures - string: 110.000 psi, annulus: 110.000 psi
FRICTION PRESS ?
String displaced with Brine - 25.00 % displaced
Observed well static
Equipment work completed
Completed operations
Equipment work completed
Function test completed satisfactorily
Equipment work completed
Suspended function test, problems encountered
Equipment work completed
Observed well static
Completed operations
Equipment work completed
Completed operations
Stopped: To hold safety meeting
Resumed operations
Resumed operations
Stopped: To splice cable
Equipment work completed
Tubing handling equipment failed - Change operation
Equipment work completed
Completed operations
Equipment work completed
Retrieved 60.0 ft from ESP
Equipment work completed
Equipment work completed
Stopped: To pick up/lay out tubulars
Completed operations
Stopped: To hold safety meeting
Completed operations
Equipment work completed
Stopped: To hold safety meeting
Completed operations
Equipment work completed
At Setting depth: 16192.0 ft
Equipment work completed
Equipment work completed
Equipment work completed
Equipment work completed
Function test completed satisfactorily
Equipment work completed
Equipment work completed
Equipment work completed
Function test completed satisfactorily
Eqpt. work completed, running tool retrieved
Facility M Pt F Pad
Progress Report
Well MPF-57
Rig Nabors 5S
Page
Date
3
17 February 98
Date/Time
11:00
12:00
14:00
05 Dec 97 06:00
06 Dec 97 06:00
18:00
07 Dec 97 06:00
Duration
Activity
Completed operations
Equipment work completed
Equipment work completed
Equipment work completed
Equipment work completed
END OF TOUR
Equipment work completed
Rig off station
STATE OF ALASKA
ALASKA OIL AND GAS CONSERVATION COMMISSION
WELL COMPLETION OR RECOMPLETION REPORT AND LOG
1. Status of Well Classification of Service Well
[~ Oil [~ Gas [] Suspended [] Abandoned [] Service
2. Name of Operator 7. Permit Number
BP Exploration (Alaska)Inc. 97-40
3. Address 8. APl Number
P.O. Box 196612, Anchorage, Alaska 99519-6612 50-029-22747
4. Location of well at surface ~r..~.;t~__ _:~_ ~ ~ ~ ' 9. Unit or Lease Name
2052' NSL, 2555' WEL, SEC. 6, T13N, R10~ ::'-"';:' -~ ! ~ Milne Point Unit
At t.o,p of producti,ve interval
666 NSL, 1713 EWL, SEC. 28, T14N, R10E
10.
Well
Number
MPF-57
At total depth
1
1.
Field
and
Pool
786' NSL, 1845' EWL, SEC. 28, T14N, R1
" ............ Milne Point Unit / Kuparuk River
5. Elevation in feet (indicate KB, DF, etc.) 16. Lease Designation and Serial No. Sands
RTE = 53'I ADb 355017
12. Date Spudded 113. Date I.D. Reached I 14. Date Comp., Susp., or Aband.115. Water depth, if offshore 16. No. of Completions
3/9/97 3/21/97 6/21/97 MSL One
'i'7. Total Depth (MD+TVD) 18. Plug Back Depth (MD+TVD)119. Directional Survey 120. Depth where SSSV set 121. Thickness of Permafrost
16750 7823 FT 16648 7732 FTI []Yes [] NoI MD I 1800' (Approx.)
22. Type Electric or Other Logs Run
GR/CDR/CDN
2.3. CASING, LINER AND CEMENTING RECORD
CASING SE-I-rING DEPTH HOLE
SIZE WT. PER FT. GRADE TOP BOTTOM SIZE CEMENTING RECORD AMOUNT PULLED
20" 91.1# H-40 Surface 115' 24" 250 sx Arcticset I (Approx.)
, 9-5/8" . .......... 40# L-80 132' 9458' 12-1/4" 2011 sx PF 'E', 800 sx 'G'
7" 26# L-80 132' 16731' 8-1/2" 250 sx Class 'G'
24. Perforations open to Production (MD+TVD of Top and 25. TUBING RECORD
Bottom and interval, size and number) SiZE DEPTH SET (MD) PACKER SET (MD)
..........
3 3/8" at 6 SPF 2 7/8" 6.5 L-80 16157'
MD TVD MD TVD
16370'-16390' 7485'-7503' 261 ACID, FRACTURE' CEMENT SQUEEZE, ETC.
........
DEPTH INTERVAL (MD) AMOUNT & KIND OF MATERIAL USED
16370'-16390' 120,709 pounds 16/20 proppant
27. PRODUCTION TEST
Date First Production I Method of Operation (Flowing, gas lift, etc.)
7/4/97I Electric Submersible Pump
Date of Test Hours Tested PRODUCTION FOR OIL-BBb GAS-MCF WATER-BBb CHOKE SIZE IGAs-OIL RATIO
TEST PERIOD
I
Row-r~bing Casing Pressure CALCULATED iOIb-Beb GAS-MCF WATER-BBb OIL GRAVITY-APl (COBB)
Press. 24-HOUR RATE
28. CORE DATA
Brief description of lithology, porosity, fractures, apparent dips and presence of oil, gas or water. Submit core chips.
None
,,,,
Form 10-407 Rev. 07-01-80 Submit In Duplicate
29. Geologic Markers 30. Formation Tests
Measured True Vertical Include interval tested, pressure data, all fluids
Marker Name Depth Depth recovered and gravity, GOR, and time of each phase.
i TKUP 16102' 7253'
TKA3 16352' 7469'
TKA2 16368' 7483'
TKA1 16395' 7507'
.......
.........
31. List of Attachments
Summary of Daily Drilling Reports, Surveys
32. I herebY' certify that the foregoing is true and correct to the best of my knowledge
Signed
l,. Chip AIvord .~z;,- ~ ~-4~,~ Title Drilling Superintendent Date ~//-,,0('~? ......
_
MPF-57 97-40 Prepared By Name/Number: Jeanne Haas, 564-5225
Well Number Permit No. / Approval No.
INSTRUCTIONS
GENERAL: This form is designed for submitting a complete and correct well completion report and log on all types of lands and
leases in Alaska.
ITEM 1.' Classification of Service Wells: Gas injection, water injection, steam injection, air injection, salt water disposal, water
supply for injection, observation, injection for in-situ combustion.
ITEM 5: Indicate which elevation is used as reference (where not otherwise shown) for depth measurements given in other spaces
on this form and in any attachments.
ITEM 16 AND 24: If this well is completed for separate production from more than one interval (multiple completion), so state in item
16, and in item 24 show the producing intervals for only the interval reported in item 27. Submit a separate form for each additional
interval to be separately produced, showing the data pertinent to such interval.
ITEM 21: Indicate whether from ground level (GL) or other elevation (DF, KB, etc.).
ITEM 23: Attached supplemental records for this well should show the details of any multiple stage cementing and the location of
the cementing tool.
ITEM 2?: Method of Operation: Flowing, Gas Lift, Rod Pump, Hydraulic Pump, Submersible, Water Injection, Gas Injection, Shut-In,
Other-explain.
ITEM 28: If no cores taken, indicate 'none'.
Form 10-407 Rev. 07-01-80
Performance Enquiry Report
Operator BP Exploration Date 01:05, 28 Aug 97
Page 1
The analysis is from - 03:00, 17 Mar 97 - to - 03:00, 17 Mar 97
Programs in Result Table: MPF-57 DRILL AND COMPLETE
Well Type Time From Time To Duration Description E.M.W.(equivalent mud weight)
MPF-57 Event 03:00, 17 Mar 97 03:00, 17 Mar 97 0 hr 0 min Obtained leak off 12.600
Hole Size MDR
8-1/2
Facility
Date/Time
08 Mar 97
09 Mar 97
10 Mar 97
11 Mar 97
12 Mar 97
13 Mar 97
14 Mar 97
M Pt F Pad
Progress Report
Well MPF-57
Rig Nabors 22E
Page
Date
Duration
Activity
18:00-06:00
06:00-11:00
11:00-16:00
16:00-18:00
18:00-18:30
18:30-20:30
20:30-01:00
01:00-01:30
01:30-06:00
06:00-15:00
15:00-16:00
16:00-16:45
16:45-18:00
18:00-19:00
19:00-23:30
23:30-00:30
00:30-01:30
01:30-02:00
02:00-02:30
02:30-06:00
06:00-09:30
09:30-11:00
11:00-12:00
12:00-13:00
13:00-14:30
14:30-01:30
01:30-02:00
02:00-03:00
03:00-04:30
04:30-06:00
06:00-07:30
07:30-08:30
08:30-10:00
10:00-10:30
10:30-13:30
13:30-15:00
15:00-01:00
01:00-03:00
03:00-04:00
04:00-04:30
04:30-05:00
05:00-06:00
06:00-10:00
10:00-10:30
10:30-21:30
21:30-22:00
22:00-01:30
01:30-04:00
04:00-06:00
06:00-07:00
07:00-08:30
08:30-12:00
12:00-16:00
16:00-19:00
12 hr
5hr
5hr
2hr
1/2 hr
2hr
4-1/2 hr
1/2hr
4-1/2 hr
9hr
lhr
3/4 hr
1-1/4 hr
lhr
4-1/2 hr
lhr
lhr
1/2 hr
1/2hr
3-1/2 hr
3-1/2 hr
1-1/2 hr
lhr
lhr
1-1/2 hr
llhr
1/2hr
lhr
1-1/2 hr
1-1/2 hr
1-1/2 hr
lhr
1-1/2 hr
1/2 hr
3hr
1-1/2 hr
10hr
2hr
lhr
1/2 hr
1/2 hr
lhr
4hr
1/2hr
llhr
1/2 hr
3-1/2 hr
2-1/2 hr
2hr
lhr
1-1/2 hr
3-1/2 hr
4hr
3hr
Rig moved 80.00 %
Rig moved 1000.00 %
Rigged up Bell nipple
Fill pits with Water based mud
Held safety meeting
Made up BI-IA no. 1
Drilled to 491.00 ft
Circulated at 491.00 ft
Drilled to 1009.00 ft
Drilled to 2334.00 fi (cont...)
Circulated at 2334.00 ft
Pulled out of hole to 1093.00 ft
Serviced Top drive
R.I.H. to 2334.00 ft
Drilled to 3002.00 fi
Circulated at 3002.00 ft
Pulled out of hole to 1570.00 ft
Serviced Draw works
R.I.H. to 3002.00 ft
Drilled to 3574.00 fi
Drilled to 4050.00 fi (cont...)
Circulated at 4050.00 ft
Pulled out of hole to 1093.00 ft
Serviced Top drive
R.I.H. to 4050.00 ft
Drilled to 5857.00 fi
Serviced Mud pumps
Drilled to 6030.00 fi
Circulated at 6030.00 ft
Pulled out of hole to 3500.00 ft
Pulled out of hole to 1093.00 ft (cont...)
Pulled BHA
Serviced Top drive
Made up BHA no. 2
R.I.H. to 4000.00 ft
Singled in drill pipe to 6030.00 ft
Drilled to 7570.00 ft
Circulated at 7570.00 ft
Pulled out of hole to 5957.00 ft
Serviced Draw works
R.I.H. to 7570.00 fi
Drilled to 7662.00 fi
Drilled to 8133.00 ft (cont...)
Circulated at 8133.00 ft
Drilled to 9169.00 fi
Circulated at 9169.00 ft
Drilled to 9475.00 ft
Circulated at 9475.00 ft
Pulled out of hole to 5000.00 ft
Serviced Top drive
R.I.H. to 9475.00 ft
Circulated at 9475.00 ft
Pulled out of hole to 1093.00 ft
Pulled BHA
1
27 August 97
Facility
Date/Time
15 Mar 97
16 Mar 97
17 Mar 97
18 Mar 97
19 Mar 97
20 Mar 97
21 Mar 97
M Pt F Pad
Progress Report
Well MPF-57
Rig Nabors 22E
Duration
Activity
19:00-20:00
20:00-21:00
21:00-21:30
21:30-06:00
06:00-11:00
11:00-12:30
12:30-13:00
13:00-14:15
14:15-14:45
14:45-16:00
16:00-19:00
19:00-19:45
19:45-20:00
20:00-21:00
21:00-22:00
22:00-00:00
00:00-01:30
01:30-05:00
05:00-06:00
06:00-09:00
09:00-09:30
09:30-12:30
12:30-13:30
13:30-14:30
14:30-21:00
21:00-22:30
22:30-23:30
23:30-01:30
01:30-02:30
02:30-03:00
03:00-06:00
06:00-06:30
06:30-06:45
06:45-07:00
07:00-06:00
06:00-09:00
09:00-11:00
11:00-12:30
12:30-13:30
13:30-14:30
14:30-06:00
06:00-08:00
08:00-09:00
09:00-10:30
10:30-11:00
11:00-06:00
06:00-14:00
14:00-15:30
15:30-18:30
18:30-19:00
19:00-20:00
20:00-22:30
22:30-06:00
06:00-10:00
lhr
lhr
1/2 hr
8-1/2 hr
5hr
1-1/2 hr
1/2 hr
1-1/4 hr
1/2 hr
1-1/4 hr
3hr
3/4 hr
1/4 hr
lhr
lhr
2hr
1-1/2 hr
3-1/2 hr
lhr
3hr
1/2 hr
3hr
lhr
lhr
6-1/2 hr
1-1/2 hr
lhr
2hr
lhr
1/2 hr
3hr
1/2 hr
1/4 hr
1/4 hr
23 hr
3hr
2hr
1-1/2 hr
lhr
lhr
15-1/2 hr
2hr
lhr
1-1/2 hr
1/2 hr
19hr
8hr
1-1/2 hr
3hr
1/2 hr
lhr
2-1/2 hr
7-1/2 hr
4hr
Serviced Block line
Rigged up Casing handling equipment
Held safety meeting
Ran Casing to 9-5/8in (6000.00 ft OD)
Ran Casing to 9458.00 ft (9-5/8in OD) (cont...)
Circulated at 9458.00 ft
Pumped Water spacers - volume 70.000 bbl
Mixed and pumped slurry - 502.000 bbl
Mixed and pumped slurry - 163.000 bbl
Displaced slurry - 710.000 bbl
Circulated at 1345.00 ft
Mixed and pumped slurry - 275.000 bbl
Displaced slurry - 102.000 bbl
Cleared Bell nipple
Rigged down Casing handling equipment
Removed Bell nipple
Installed Casing spool
Rigged up BOP stack
Installed BOP test plug assembly
Tested BOP stack
Installed Wear bushing
Made up BHA no. 3
Singled in drill pipe to 1345.00 ft
Drilled installed equipment - Cement retainer
Singled in drill pipe to 8300.00 ft
R.I.H. to 9340.00 ft
Tested Casing - Via annulus and string
Drilled installed equipment - Landing collar
Circulated at 9495.00 ft
Performed formation integrity test
Drilled to 9747.00 ft
Drilled to 9800.00 ft (cont...)
Pulled out of hole to 9450.00 ft
R.I.H. to 9800.00 ft
Drilled to 12114.00 ft
Drilled to 12491.00 ft (cont...)
Circulated at 12491.00 ft
Pulled out of hole to 9366.00 ft
Serviced Top drive
R.I.H. to 12491.00 ft
Drilled to 14090.00 ft
Drilled to 14370.00 ft (cont...)
Circulated at 14370.00 ft
Pulled out of hole to 12000.00 ft
R.I.H. to 14370.00 ft
Drilled to 15487.00 ft
Drilled to 15859.00 ft (cont...)
Circulated at 15859.00 ft
Pulled out of hole to 9458.00 ft
Serviced Top drive
Serviced Block line
R.I.H. to 15859.00 ft
Drilled to 16421.00 ft
Drilled to 16750.00 ft (cont...)
Page
Date
2
27 August 97
Facility
Date/Time
22 Mar 97
23 Mar 97
24 Mar 97
M Pt F Pad
10:00-12:00
12:00-15:30
15:30-16:30
16:30-18:30
18:30-21:30
21:30-23:00
23:00-06:00
06:00-09:00
09:00-09:30
09:30-10:15
10:15-10:30
10:30-11:00
11:00-12:00
12:00-22:30
22:30-00:00
00:00-06:00
06:00-09:00
09:00-09:30
09:30-10:00
10:00-12:30
12:30-13:30
13:30-14:30
14:30-15:00
15:00-15:30
15:30-16:30
16:30-18:00
18:00-19:00
19:00-20:00
20:00-21:00
21:00-23:00
23:00-23:30
23:30-23:45
23:45-00:30
00:30-06:00
06:00-14:00
14:00-15:00
Duration
2hr
3-1/2 hr
lhr
2hr
3hr
1-1/2 hr
7hr
3hr
1/2 hr
3/4 hr
1/4 hr
1/2 hr
lhr
10-1/2 hr
1-1/2 hr
6hr
3hr
1/2 hr
1/2 hr
2-1/2 hr
lhr
lhr
1/2 hr
1/2 hr
lhr
1-1/2 hr
lhr
lhr
lhr
2hr
1/2 hr
1/4 hr
3/4 hr
5-1/2 hr
8hr
lhr
Progress Report
Well MPF-57
Rig Nabors 22E
Page
Date
Activity
Circulated at 16750.00 ft
Pulled out of hole to 9458.00 ft
Serviced Top drive
R.I.H. to 16750.00 ft
Circulated at 16750.00 ft
Dropped EMMS survey barrel
Pulled BHA
Pulled BHA (cont...)
Installed BOP test plug assembly
Rigged up Top ram
Tested Top ram
Removed BOP test plug assembly
Rigged up Casing handling equipment
Ran Casing to 9500.00 ft (7in OD)
Circulated at 9500.00 ft
Ran Casing to 7in (13700.00 ft OD)
Ran Casing to 16732.00 ft (7in OD) (cont...)
Rigged down Casing handling equipment
Rigged up Cement head
Circulated at 16732.00 ft
Mixed and pumped slurry - 51.000 bbl
Displaced slurry - 636.000 bbl
Tested Casing
Rigged down Cement head
Rigged up Drillstring handling equipment
Installed Seal assembly
Rigged up Top ram
Removed BOP stack
Installed Adapter spool
Installed Xmas tree integral components
Tested Seal assembly
Tested Xmas tree
Installed Hanger plug
Laid out 5in drill pipe from derrick
Laid out 5in drill pipe from derrick (cont...)
Serviced Block line
3
27 August 97
7~' FEB c'- '01
Pr~Jcihn~ R~ r ~
J'/JIIII ftJ
AFE No:. r3470~ iF;laPOr~NO: 1 G~I 7/9'/ compIoti°n d~y~ . aupb Init: myem
Oon~amo~ NABOR~ 4ES ~lmne: 4164 'ldall~,~,., $123~348 IWOJ~um~oosf-:'~P .... '$123,3~ I Oumm
Operation at 0600: RIH W/BAKER RETRIEVING TOOL
~i,~nfhP~UCfion Une~ .... ~/A IIPed°rat°d. ,.Int~: ' a474,-a4~; ]Sudace Csg. ~!: N/A I~lv~D~nt),lLast Gsa Tes~: N/A
~lg A~pt (hr/date): t200 HR~, ~ o.18.97 ': I Ri~Releaee (hr/dale); N/A ' '
Ftuld fy~e: Ib~a~__ LoSa: - ~B LaK,~_ Cost: l~at:
BHA'De~cripfl~: .BAKER RETRIEVING
......... ., .
,,, ,
.
Blt&BitNum;N/A Size: N/A Make: 'N/A !Typo: ~A ISa"al N/A ~FA: IDe~hln:'
e~FA'
Qu~ NIA N/A ' N/A N/A'
S~rce: ' Volum~ ~e Fluid; CG)A Rule; N/A P~eaeure: NIA
~ummulaflve ·
. ' .... ' ' ' Daily Volume: N/A B~LlVolume;.~.. . N/A
'" = ' . - Freeze Prot~ ~lul~:
~, ..... ,,
..
.
Volume: N/A
. . ~al
Fuel 789 - ]Fuel ..... ]FUel [0d. Water . '7~ GAL pd.' waler
~s~: ~ I Source: BPX ~39 Lake
. - IRe~v'd.; ...... gallU~: . BaLl, opts; · '
Cu~nos Dot~ - I i w~,h~, ma~ .....
~l~ "'~ c~umulatiVe' 'N/~ ,Storage ~A'I ITM~"=: ~i~"~"c~r:'
. , C~Rll~. , , -F . .
~ 8~11 Drill: 5j97- ]~11'~)? ~.olum. (Gal..): SPIll; ~' _ R~ Fiie~? '"
i i iI _ _ i I II i1
T~e Opera~on Prob O°de' Hrs. ' Operations From 0600 (o OS00 ' ' '
~ ~ NO SPILLS NO ~CIDEN'rS .DSLTA 680 "DS~ ~40 ....
'"~~ . MI/~U 6 MOVE JN RI~ UP LEVEL DE,RiCK & ~ERM G SAF~ OU~ E~UiPMENT.
~-~7~ -NU/ND 6 ND F~AC. TREE- NU BOP'S &- Pb~- BPV.
.
170~0 ~EST-BOP 3.5 SET PLUG & TEST BOP TO 250 LOW ~'50~ HIGH (TEST WAIVED BY
JOHN ~PAULDING WITH AOGC)
.
2~-~30 PL-PLUG · 2 LOAD SHED ~IYH~'BG.
~-0~30 Pb-PLUG 2 ~1~ 0P 2-7/~" TBS. ' ......
~-01~0 -PL-PLUG - ' ' I DISP~CE FRE~E PRO~EOTION ~'IGEH TANK. W/9,1 PPG. B~INE
01~ PL-PLUG - ~ 4.5 CON. RIH WITH T~G; & REI-. ~E .....
.
':. ' -' - RIG ACCEPT ~ 120~RS. 6-16-97 (LGM)
.
i ..= .
' ' HOLD 5-MIN SAFETY & ENVIRO MEETIN'~ BEFORE EACH TOUR.
=... . , . .
' HOLD SAFETY & OPERATIONAL BRIEFING BE~O[~E EACH TASK
IROY FRIES R~PORTED A DISCOMFORT IN BACK.~AS NOT SEEN MEDI~ "~
.... , .. ~.=. ,
. =. . . ~..
.
, ,.,, ....
16:01 No .005 P.01
Report
........... J-.,,HJ, H ., L ISup[,Inlt:
"~t=F "~:' 3;?;~ J Repo~NO: 2 "" 6/17/97 J OOmplefi~n Day.EsL ~ myers
' ~ '
Well: MPU F-57 D: 16731' 166~' ,. N/A
IPaD; ITnp o' F'":
Con~o~ NABORS 4ES ~ime; 415~ I~ally $58,734 '1~'mm ~P $182,082 J camm
Ilnto~edlam (Produ~)
~ra~on a~; RIH WITH 4.5" TBG. FOR FRAC ISltn/Denfh 7" 26~ ~ 16731'
~lg A~t (hr/a~): -1 ~ H~8 ~ ~1 ~97 J Rig Rel~ (hr/d~Ja): N/A
.um, .o.., ~,~.r~,..:..,o i~.~: ~'* ~"~:" "'~ I""' "'* P'~%~'"~'~: '"'* I
J . - ~ Total N/A JDail~ $16,000 JCum' $18,000 L'
~luld ' Brine ~er N/A Dai~ ~A DB Loss: I ~st: I~at:
Fluid ~e: . balen~:
~HA Des~dptt~:
.
, ,, , , . ,,
.
. ~ .....
~"' ~'"'~ ~: "~' I"°": I~: 7': ~.,o~:
Out: ~A N/A - ~A N/A N/A N/A., J , N/A
~ill g~P~ F~; ' Hri: N/A ' - ' . . __N/A
o,,.. -,* ~* - ",,-!"°'. !~:- ~,~ .~' -,. I
,,~,~,,::,~ ! "' !
~ur~: Volume: - TY~ Fluid: C~2A - Rem; N/A PrePare: N/A
- ! I Well~ ~Pm
' ' - - Daily V~u~a: N/A BBL~ Volume; . N/A
' ' : - : -' ' ' ., Freeze Pr~ Fluid: ~A '
.
. , . , ~.= _ .
· Fuel & W~rV~ume: N/A ,. gal .
' ' "" D~ta .....
~sed: gal S~r~: , d:~U~{l: ' I?,Water Lake
''-
~jpaeData. . iW,~. :W..,,,.rsp...=~"'"mPhJChlll Fa=tar:
Dail~ N/A c~umulatl~: N/A ISa°rage 'N/A emp{
- , - c~Bm' , "F .... '
~,~ ~, D~; 6~5~7 I~"" (~)~ N '1~:(~'): N~A -~ ~"~ N~A 'l~°P~
....
_ ! , _ _
~,den~ (Y~) N ~e: N/A. ... J~m~ovo.' N/A i.p, Fil~? (Y~) N/A
. ,., , .,
Time ~era~on ,Prob ~od~ ~a. Oper;~lo'ns Fro~ 0600 lo ~00-
- - ...... NO SPILLS NO ACCIDENTS "DSLTA 681 "'DSLS ~41 .....
~-~1~ pL. PLUG .- 9 . CO~T.' TO PU 2-7~8" TBG/ TO 16~9' & DISP~OE WELL ~RE W/9.~PP~ --
15~-1~ TEST-~G 1 ' TEST~SG. TO ~00 PSI.. · ~ ' .'
.
16~-1~0 PL-PLUG .... .6 ENGAGE & MONITOR & REL~sE' PLUG ~ 1~272' RIH TO 1~293'
1~0-1~ .PL'PLUG '2 ' REM:;~IRG. BO~OMS'UP ~-BLIP ~' DREG, LINE,
18~ PE-PLU~ ' ' 5.6 POOH WITH 'PLUG & ~Y'~ '
2~:0~00 ND~U" 2 CH~. ~AM~ TO 4.~'& TEST'&'R~ WEAR RING,' .........
~o0~ F~ '
- 4 LOAD PI~E SHED WITH 3.5" & 4.5" FRAC-STRING & ~TRAP
-- sAME . "
..
.
.
.
· ... ,. -
- HOLD 5-MIN SAFETY & ENVIRO MEETING BEF~'RE ~CH TOUR '
.
· ~ , ..
..
' H~L~RiEF SAFE~ ~ d'PE~TIONAL ME~iNG BEFOR~ACI~ TASK. '
-- _
.
.
.
..
.
_ _~_
..
.
16:08 No.005 P.01
r Report
.T D: FEB_
PrlJdhnA I~y !-3
I
MPg F-57 ~; 16731' 16648' IT~ of Fill; ~A
PD; Wall
Ilnterm~late (Pr~u~a~) Csg= 7" 26~ ~ 16731'
O~ra(~n at ~ CLN-FRAC SD. OUT OF ~' CSG.
~O A~epl (hr/~ate); 1~ HRS ~ 6-1'6'-97 IRIo Reich (hrldsto):
Fluid Tyne: I ~ano~t ..... ~a~: ~ L~. CO~; ICost:
BHA O~pllon; ' ~
,.==, .~.
.
.
nH~ No: ~A !,~_ ~engl,l:,[., L N/A !o.~ ~' '~~: ~A -- l' 'Hours On ~nre: N/A
ii j .
Bit & Bit Num: N/A ~lze: ~/A Make' ITY~' K/A Ise~' ' ~/A ~el~rFA: _ ' _ _ _ D~pm In:
' '. .... ,..: ..... _....,.
8it & Bi[Num: N[A Size; N/A Make~ N/A.../FYi:. N/A INfllS°ria ......... ' N/A ~et~l'FA; 1Deplh In~ N/A
o~: ~A I~: ~*' ' .. ~ni~~6;i~ ' . . --
I~ate; N/A I~re~re: 'N/A
8our~: V~ume: T~ Flu~: InJ~ion O~A I . 9pml p~
,, We": ~Ummu~ve
Dally V~ume: ' N/A RRI I Volumg; N/A
I _ -- I _ _ III I I
~reeze Prot~ Fl~d:
Volume: N/A ..... t ............
rial . ..
Fuel & Water
Fuel ' I FUel ' ~BPX ~uel - IDfl. warn, lgd. Water
~d: . . ~1 I Sour~: Ine~'U; gallUsod: BBL~OUrCe:
Cu~in~ Da~ I I W~lhar B~I~
C~n, 'F _ 'F
...... y '
......
--.. ., ..
~mo ~ra~on ProbOo~e Hrs. ' O~r~tions From 06~to
~ 8PILLS NO AOOIDENT8 "DSLTA ~2 "DSL8 14~ "'
06~-14~ FRAC 8 CONT. Tb'RIH WITH 4.5" FRAC STRING-TO 15790' '
14'~-17~ F~O ~ RIG UNE8 & TEST TO 7~00 PS1, HOLD SAFETY & OPERATIONAL
& PERfOrM INJ. TEST & DATA FRAC.'
iY~-i~ FRAC 2,5 DESI~N"FRAC. ' ....... ~ ..............
"1~3~a~ FRAC 1 PUMP ~RA0 A~ ~ESIGN SCREENED O~T'W~H ~3: PP'~. SD, ON' PERFS. ' "
-" PUT ~100 ~ 16120 BEHIN'b-P'IPE & LE~ ! ~g70~ IN PIPE FOR ~ ~OTAL OF
- - "~'~i~070~ PUMPED, '"
~~0 -FRAe e REV. FRAd~D. OUT OF TBG. · ....
2~0 ~RAC :4 ~MON~OR WE~ ISiP'A~ER.~ISV, OUT=760 PSI. A~EMPT T~'~EEO OF
' : PSI. 160 PSI. & WE~ ~EMAIN ~B~ RAISESRINE ~ TO 9.4
o23~ FRAC ~,5 RAISE WT. TO 0;4 PPG. & REV. SD, FROM 7"
. . ...
HOLD .6-MIN SAFETY ~ ENvIRO, ME~ING BEFORE ~CH
HOLD BRIEF ME~ING BEFORE '~H TASK & OI~ENA'i IONAL
. , .
=.. , ,, ... .
.
,.
i6:iO No.003 P.Oi
Report ·
Tn: FEB Od'01
~'rlldhn~ H~_¥ I} f---- I C43mnlntinn ~A/Vnrkl
f ' ]$upv Init'
Well:lAFE N°:' G470~2" MPU F-STlReP°rY'N°: 4 i' ~: "' 16731'6/20/97.1bBD;j~mplotl°n D~y~Est_ 16~48' .... !T°p °f/Flll; ' N/A" myers
~.,~.,o,: N~.o~s 4~s ~',~-: ~4 I?""~ .~:~a~ l~u,.~ ~o~ .~,~0 l
' ]lnlen~llate (Pr~ucUon)
Operetta at ~: raiae brine ~ to 9.8 ppg. l~iFp/~nnfh 7" 2~ ~ 16731'
Pr~uMi°n Unor: ~A lPedorat~ Intel: 1~70'--16~0' ~udn0e Csg. psi: ' N/A lua.[ C~g 'l e~u N/A
~lg A~t (hr/date): 1200 RRS ~ 6-1~7 IRIg Release (hr/da~): N/A
"'': "'* "'* !
,
BHA ~ulp"~n: ' '
=,
,
Im~ & ~it Num: ~A Slza: '*N/A Make: 'N/AIJ~e: N/A INn;JSed~. ' NIA' ·
Om: N/A ~A RPM: N/A WI: N/A Condition:
~t & Bit Num; N/A Size: N/A' Make:. N/A. ~ /F~&: N/A IN~'ISeHnI'..'N/A /Pet~F~ ....... JDe~.,
"'"'""°"' "'* I"""' "'* I
Out: N/A N/A I; N/A NIA
' "' [~le~on D~,~ ' '
Bout: ~ume: Type Fluid: ~l~e,lOnwnll. '. C~,A,IR~&¢- 'N/A, gpm,IPre''ure, N/A
...... ~ily Vol~e: N/A. . ~ummul~llve
.~Gl.'j Volume: . N/A BBL
.
.. . : . Freeze Prot~l Fluid; ~A;
.
.... V~ume: ~A'
, , · ..
. , 'Fuel ~ W~ler ~-fn " ' ·
ID~.'Water
FuN ST0 IFu~ BpX IFu-~ . ID~. ~ter 3300 gal. ' ~USour~
U~: ~P~ I ~ource: IRq~d: _ ~allu~ed:
- /Otorage N/A amp: -, -
~tS~ll ..Ih 6/18/97-.lspill (Y/N)?. . ' N ~ume CG-I..): '.. N/A- I~'y.e s.~,:' N/AI""%"
~dent? (Y~) N IName: N/A i~mpioy'r: ~A 'lRpl F,I~? (Y~' N/A
,
Time Operation Pr~ ~e Hm. Operations Fr~' 0600 !o ~00
NO SPILLS NO ACCIDENTS "DSL~A ~3 "DSLS ~3
-- _ m. . . ,...
060~a~0 CLN~UT 1.5 OLN-OUT FLOW LIllE
07~-1~0 CLNJ0UT .... 6.S R~CI'RO&WASH F/~sTg0'---i'GG4B &'RAISE BRINEWTT0g~DPPG. '"
1~15~ C~UT ' 1.5 R~ ClR UNTIL CLN RETURNs & ~Y DN TO TOP OP PERFS.
153~1930 CLN~UT 4 PERFORM ~G. WASH & DISP~CE VIS, BRINE WIT~'CLN-
lg~2~0 CLN-OUT. I ~ONITOR WE~ & ~I~'UP BAROID FILTERING UNIT
- 20~-~0 cLN-ouT '" 3 R~. ~lRC & FILTER.BRINE R~URNS 123 NTU
a~~ C~UT --~.6 MON. WELL (FLOWINg) ~iSE'WT ~O g.7 PPG. & FILTER'NTU ee 'MO~.WE~
~ (FLOWI~ & MA~NG .OIL) UNABi.E TO'GET GIP)~Ai~iN~-aRiNE-WT.TO
.
P~e. ' ....
.
.
HOL~'~-MIN 8AF~ & ENVRIRO MEETING BEFORE EACH ~OUR
.i
" HOLD BRIEF~MEETING BEFORE E~CH TASK CHG,'
.,
.
, .,' . =. _ , ,.
. . ' .
16:18 No.O04 P.01
Report
FEB r ) 1
IJrill~nd - ! (].nrnnlRlin n/Wnrl(dV~.
No: 347062 G : 6121197 , ' my=r=
MPU F-57 O: 16731' ., IPAD=- I
1GG4O' Top of Fill:
,
.... ~t.. IWO ~S~: I Wnll
Ilnta~dlaIo (Pr~l~)
O~a~n at ~: RIH WITH E~P COMPL~ION I~l,~n,,~h 7" 26~ O 16~1'
.... .
A~6pt (hr/date): 12~ HRS ~ 6-16-97 ! Rig Relea~ (hr/date): NIA
. . , , __ ,
Fluid Brine N/A DalIv NIA I Tmal ~A I ~aily
Oe~dptl~:
,
==, .. .. ..
' F I
BItNum: N/A jOl~e: N/A :~ke: ~A !Ty~: . ~A iNdt.. - ...... . .
, ' 1~¢~ P~In ~..~ ~r~m: - ~A
V~: T~ R~: I~ CC-~ - ate: N/A a~/ ·
W~;
- ~ .- - -~mmu~ve
. - .. .. . ~y v~: ~A' ~H v~u~: ~A
. ,
- -- : 'Fro~m~t~ ~A . :'
s , ,
... - '. V~: ~A
F~ & Wnlor
~ffipaa Dmta 1 I _ ~n~r ~tK' -
~A ~~uvi: N/A le{~aae ' ~A I F~ Wl~ e~. - - ~lil
~ CRmtn. . , _ _J l. *Fl ...... ' ........
- ...... -_ -, ~f~/R~p~hm · _ ...........
I ... ' ~l/g7
~SNIIDnli:- ~i~7 ' . .~(e..~.: N/A' ~A
~me ~em~ Pmb ~e Hrs. -O~m~ Fr~ ~ to ~
'J NO SPIL~ N0 ~CCIDENTG "DOLTA 684 --DS~ 1~
, , , . _ -
~7~~ ~Uf - -~ 1 ~NT. TO INCR~SE BRINE W'l. '10 9.8 PPG. & ~ONITOR WELL ,~K' ·
19~2030 ND/NU 1 0Ha. ~MS IN ~P T~'~-7/8" & TE~ TO ~ I.OW &
2~2~ RU~ 2.5' ~U'-gSERVICE PUM~ &'~OTOE ......
~2~- RUN~. 3 RIH'WI~SP COMPLETION ON 2~7m" ~G.
~ RU~ 3 ~KE MID~NE SpMO~-I'N ESP OABEE &OUT DRLG. uNE.
~~ RUN~ 1 ~;. TO RIH WITH~P ~Y."'
~ ,,___ , . ' ~ ~.= -, . ,
- HO~ '~MI~ ~A~ & ~VlRO. ME~iNG a~i~cii TOUR
.
.
.
~. .-
HO~.~¥EF'SAF~ & OPE~TIONAL ME~ING ~EFOltE ~OH TASH CHG.
.
,,
_
.
-..
..
-.
, , ,,,
.
. .
- .-. - . :
. ' -,, ,
_,,. ,, , , ~..
~ .. , ,
16:14 No.007 P.O1
Report
~ FEi3 'O1
~n~dhn~ B~v r~,-illir ---'
.~ntr~ctar'. NABOR~ 4ES rh°ne:. 4,154 ' ]De. fly'r..n,~,~.. $27,934. IW01(~'mmcosts:C°mp $374,888 Il W~llC'A'mmen~, ' -
Ilniermediato (Production) Csg: ·
,~eratl~ at 0600: RIG MOVED TO MPU F-0O im:,r,Jr3r.xffh 7" 20fi ~ 16731'
i~roducflon Llnan N/A' i~erlore, te~i Intrvl: 16,370'--~{{1390' purfe=e Oeg. I~: N/A' It. est Csg Te.su '" NtB --
:Ug Ace&Pt-(l~ffclate): 1200 HRS O 6-16-97 ! Rig Rolease (~'/dale): 2400 hrs 6-21-97
N/A lP"l: N/'A piew P,.m~ ~ate: N/A I$'~w Pump p.,;
Data No. 2[liner Size: N/A ' PM: N/A Pl~Ji' : - -
Fluid Brine I°ver N/A Dally N/A d. ToW N/^ I o.l,~ '" Ic."~ $4i),000
Fiu{d T~p~: I balance: ~' 8B I ess: t Gosg ICo61; .
*'" P": I ", i !"'*"°""':- p
_
BHA D~dpfi~: . -, . ......
....
.
- .
. ..,
.
.
' ' BNA Lon~: N/A ' Date ~t Ins~: N/A'
- , ' '' , · · - , --
Bit & Bit Num: ~A ,S~o: N/A Make; ' N/A ]T~: ~/a ]8eral ~A ~ot~IFA~ ' - [Dep~ In:
- · ~ . . , ,i - - - - - - - - [
, , ,. t . '~ I~ '-' --
Mill Oep~Ou~ N/A ... Fig: -N/A Hr.:. ~a I ROP: ' N/A~ IRPM: N'A:IWc ~A I~.d.l~: - N/A
- '~ ' !' -I ,, .
M~e: iA ]rye: N ISenal Ilet~F~ ' '
~t & Blt Num: N/A '; '~o: N/A , -:"_ l. _lA_ INa' N/A 1~111~; '~e~ In: N/A
Mill ~P~' ~g:' Hm: ~A IROP:' ~A IRPM: '~A ~ N/A '
0~: ~A ~A - ~A -
.... . - . ~.o~.ng~.___: ~ ....
' I~re~ur°: N/A
. R~ ] V~lum~: ~A
' Fre~e-Pr~' Ruid: ~A ....
. . . -- . .. ...
' ' - ' 'v~u~ ~A-
-'~. . . .
Fu~ ~ wmor 6m~ -
aua - I Fuel ePx I¢-*~ - ' p.. w~; -. '. ~d. water .
~s~: .~I I 8o~ce:. IRe~d: ' gal~B~; . · B~our~:
D~I~ ~A C~m~v°: N/A =lo~o N/A ~: ' - -
c~,~;,.. ,~i~~u~:,
. , , -. ' I
'
Time ~ ',.~omflon Prob~ -Hre. O~a~s From~O0~ 0600
NO S~I~S NO AOOIDENTS "DSLTA ~5 "DSLS 14~
J= ,..
~10~ RUN~M 4 ~NT, RIH ~ITH ESP ~P,-
~ -
l~fl~ RUN~oM " ,4 ~KE ~ID LINE S~L(OE IN E~P OA~LE .....
~16~ RUN~M 2 ~NT, RIH.W~ ESP'~MP & MO HANGER & ~NDING ~.' "
~ . ... , .
1~1~ RUN~M ' 3,5 ~KE~PLIOE ~T H~GER-
P ,, ,,
le~2~ RUN~M .5 ~ND TBG. RI~S ~y~DN ~, & SE1 ~O.
~ - , ,,
2~-2200 N~U 2 ND BOP & NU.TREE & TEST SA~E TO ~ PS'I~
~-24~ RUN~ 2- ~EEZ~ROTECT TO R~'~I~ DIESEL & SEGURE WELL &'CEL~R '
- .
- . ._
.
.
. u , , ~ ,~ :
.
. .
.
.
. .
,, - - ., - -
' RIG RELIED A~~ hRS. ~21-~
..
, ~ ~ .. , · . , .
.
..
.... · ---HOLD 6-MIN 6APE~'& ENVIRO ME~ING' BEFORE EAOH TOUR ....
'. HalED BRIEF--SAFE~& OPERATIONAL MEE~'ING BEFOhE ~CH TASK. "' -"
- . ... .
.
· . · .... ,
.
.
. . .
..
- ,,,
, ~ -~ ,, ,. ,, . .
-- -- II L I I I ~ - ·
. .
.- .
,~ ~ _,
.....
16:19 No.O06 P.O1
Hepon
B.P. EXPLORATION
F PAD, WELL NO. MPF-57
MILNE POINT FIELD, ALASKA
Gyro Multishot Survey Inside 7"CASING
Survey date: 11 - MAY, 1997
Job number :A0597GCE399
ORIGINAL
CONTENTS
JOB NUMBER :A0597GCE399
1. DISCUSSION, SURVEY CERTIFICATION SHEET
2. SURVEY DETAILS
3. OUTRUN SURVEY LISTING
4. QUALITY CONTROL
5. EQUIPMENT AND CHRONOLOGICAL REPORT
1. ,DISCUSSION , SURVEY CERTIFICATION SHEET
DISCUSSION
JOB NUMBER: A0597GCE399
Tool 772 was run in WELL# MPF-57 on SCHLUMBERGER 3/8" wireline inside casing.
The survey was run without problems.
SURVEY CERTIFICATION SHEET
JOB NUMBER- A0597GCE399
The data for 'this survey and the calculations for this survey were obtained and performed by me
according to standards and procedures as set forth by Gyrodata Limited, true and correct to the best of
my knowledge.
TOM STODDARD
OPERATIONS ENGINEER
The data and ca!culations for this survey have been checked by me and conform to the standards and
procedures as set forth by Gyrodata Limited.
This report represents a directional survey of this well based on the original data obtained at the wellsite.
Checked by :-
ROB SHOUP
OPERATIONS MANAGER
2. SURVEY DETAILS
SURVEY DETAILS
JOB NUMBER: A0597GCE399
CLIENT: B.P. EXPLORATION
RIG:
SCHLUMBERGER
LOCATION: F PAD, ALASKA
WELL: MPF-57
LATITUDE: 70.505 N
LONGITUDE: I49.5 W
SURVEY DATE:
SURVEY TYPE:
10, MAY, 1997
GYRO MULTISHOT IN 7" CASING
DEPTH REFERENCE:
40.8'
MAX. SURVEY DEPTH:
ROTARY TABLE ELEVATION
16534'
SURVEY TIED ONTO: NA
SURVEY INTERVAL:
0-16534'
APl NUMBER: 050-029-22747
TARGET DIRECTION: 44.53
GRID CORRECTION: N/A
CALCULATION METHOD: MINIMUM CURVATURE
SURVEYOR: TOM STODDARD
3. OUTRUN SURVEY LISTING
A Gyroda t a Di r e c t i ona I Survey
for
B.P. EXPLORATION
F PAD, WELL NO. MPF-57
MILNE POINT FIELD, ALASKA
Job Number: A0597GCE399
Run Date: Il-May-97 21:00:00
Surveyor: TOM STODDARD
Calculation Method: MINIMUM CURVATURE
Survey Latitude: 70.505000 deg. N
Sub-sea Correction from Vertical Reference: 40.8 ft.
Azimuth Correction:
Gyro: Bearings are Relative to True North
Proposed Well Direction: 44.530 deg
Vertical Section Calculated from Well Head Location
Closure Calculated from Well Head Location
Horizontal Coordinates Calculated from Local Horizontal Reference
A Gyroda t a Di rec t i ona i Survey
B.P. EXPLORATION
F PAD, WELL NO. MPF-57
MILNE POINT FIELD, ALASKA
Job Number: A0597GCE399
MEASURED I N C L AZIMUTH VERTICAL
DEPTH DEPTH
feet deg. deg. feet
VERTICAL DO~LEG CLOSURE
SECTION SEVERITY DIST. AZIMUTH
feet deg./ feet deg.
100 ft.
0.0 0.00 0.00 0.0
90.0 .18 177.69 90.0
191.0 .26 183.66 191.0
291.0 .22 136.29 291.0
393.0 1.13 65.27 393.0
HORIZONTAL
COORDINATES
feet
490.0 1.83 59.65 490.0
591.0 3.01 64.66 590.9
690.0 4.65 68.55 689.6
789.0 5.81 70.73 788.2
891.0 7.20 73.40 889.6
0.0 0.00 0.0 0.0 0.00 N 0.00 E
-.1 .20 .1 177.7 .14 S .01 E
-.4 .08 .5 180.3 .53 S .00 W
-.6 .20 .9 172.6 .90 S .12 E
.4 1.05 1.3 118.2 .62 S 1.16 E
992.0 10.45 74.35 989.4
1091.0 12.59 77.29 1086.4
1190.0 13.90 77.85 1182.7
1240.0 14.75 78.12 1231.2
1290.0 15.81 77.78 1279.4
2.8 .74 3.4 80.6
6.8 1.18 7.6 70.7
12 . 9 1 . 68 14 . 2 69 . 0
21.1 1.19 23.2 69.3
31.3 1.39 34.7 70.3
1340.0 16.66 77.45 1327.4
1390.0 18.22 75.96 1375.1
1440.0 19.98 74.19 1422.4
1490.0 21.40 72.96 1469.1
1540.0 21.70 72.29 1515.6
44.8 3.22 50.2 71.4
61.6 2.25 69.9 72.7
80.6 1.33 92.5 73.9
91.0 1.71 104.9 74.4
102.0 2.13 118.0 74.8
1590.0 21.79 72.05 1562.1
1640.0 22.32 71.69 1608.4
1690.0 23.44 70.67 1654.5
1740.0 24.62 69.38 1700.1
1790.0 25.96 67.49 1745.4
113.7 1.71 132.0 75.1
126.4 3.25 147.0 75.2
140.5 3.70 163.3 75.2
155.9 2.96 181.0 75.1
172.1 .79 199.3 74.8
188.5 .25 217.8 74.6
205.2 1.10 236.6 74.4
222.6 2.38 256.0 74.1
241.0 2.58 276.3 73.8
260.5 3.13 297.6 73.4
.56 N 3.36 E
2.51 N 7.15 E
5.08 N 13.23 E
8.20 N 21.69 E
11.73 N 32.69 E
16.01 N 47.57 E
20.81 N 66.74 E
25.68 N 88.89 E
28.26 N 100.99 E
31.01 N 113.88 E
34.01 N 127.53 E
37.46 N 142.11 E
41.69 N 157.92 E
46.69 N 174.86 E
52.18 N 192.39 E
57.85 N 210.02 E
63.69 N 227.87 E
69.97 N 246.26 E
76.93 N 265.40 E
84.79 N 285.26 E
Page
A Gyrodat a Di r ec t iona i Survey
B.P. EXPLORATION
F PAD, WELL NO. MPF-57
MILNE POINT FIELD, ALASKA
Job Nun~er: A0597GCE399
Page
MEASURED I N C L AZIMUTH VERTICAL
DEPTH DEPTH
feet deg. deg. feet
VERTICAL DOGLEG CLOSURE
SECTION SEVERITY DIST. AZIMUTH
feet deg./ feet deg.
100 ft.
H 0 R I Z 0 N T A L
COORDINATES
feet
1840.0 26.54 66.46 1790.2
1890.0 26.98 65.83 1834.8
1940.0 28.01 65.05 1879.2
1990.0 30.00 63.44 1922.9
2040.0 31.25 62.62 1965.9
280.9 1.47 319.6 73.0
301.9 1.04 341.9 72.5
323.4 2.18 364.9 72.1
346.2 4.27 388.9 71.6
370.4 2.64 414.1 71.1
93.44 N 305.61 E
102.54 N 326.20 E
112.14 N 347.20 E
122.68 N 369.02 E
134.24 N 391.72 E
2090.0 33.16 61.60 2008.3
2140.0 34.42 60.83 2049.8
2190.0 35.93 59.59 2090.7
2240.0 36.59 59.39 2131.0
2290.0 37.30 59.34 2171.0
395.8 3.97 440.4 70.5
422.4 2.68 467.9 70.0
450.2 3.32 496.3 69.4
478.7 1.35 525.4 68.9
507.8 1.43 555.1 68.4
146.70 N 415.27 E
160.09 N 439.63 E
174.41 N 464.63 E
189.42 N 490.10 E
204.74 N 515.96 E
2340.0 38.58 58.97 2210.4
2390.0 39.69 58.29 2249.2
2440.0 41.17 57.20 2287.2
2490.0 42.23 56.53 2324.6
2540.0 43.51 56.07 2361.2
537.5 2.61 585.5 67.9
568.1 2.37 616.6 67.4
599.7 3.28 648.6 66.9
632.2 2.31 681.4 66.4
665.5 2.63 714.9 66.0
220.50 N 542.35 E
236.93 N 569.29 E
254.23 N 596.71 E
272.41 N 624.56 E
291.29 N 652.86 E
2590.0 44.38 55.59 2397.2
2640.0 46.05 54.65 2432.4
2690.0 47.11 54.17 2466.8
2740.0 48.79 53.50 2500.3
2790.0 49.86 53.05 2532.9
699.5 1.87 749.1 65.5
734.4 3.58 784.0 65.0
770.2 2.23 819.7 64.6
806.8 3.52 856.2 64.1
844.3 2.23 893.5 63.6
310.78 N 681.57 E
331.08 N 710.67 E
352.22 N 740.20 E
374.13 N 770.17 E
396.80 N 800.56 E
2840.0 51.39 52.45 2564.6
2890.0 52.35 51.85 2595.5
2940.0 54.44 50.97 2625.3
2990.0 55.08 50.41 2654.1
3040.0 56.37 49.67 2682.3
882.5 3.20 931.5 63.2
921.5 2.14 970.1 62.7
961.4 4.41 1009.5 62.3
1002.0 1.58 1049.5 61.8
1043.1 2.84 1090.0 61.4
420.19 N 831.33 E
444.33 N 862.38 E
469.36 N 893.75 E
495.24 N 925.35 E
521.77 N 957.02 E
A Gyr oda t a D i r e c t i ona i Survey
B.P. EXPLORATION
F PAD, WELL NO. MPF-57
MILNE POINT FIELD, ALASKA
Job Number: A0597GCE399
Page
MEASURED I N C L AZIMUTH VERTICAL
DEPTH DEPTH
feet deg. deg. feet
VERTICAL
SECTION
feet
DOGLEG CLOSURE
SEVERITY DIST. AZIMUTH
deg./ feet deg.
100 ft.
HORIZONTAL
COORDINATES
feet
3090.0 57.59 49.03 2709.5
3140 . 0 59 . 22 48 . 24 2735 . 7
3190.0 60.60 47.73 2760.8
3240 . 0 61.84 47 . 21 2784 . 9
3290.0 63.12 46.98 2808.0
1084.9
1127.4
1170.5
1214.3
1258.6
2.67 1131.0 61.0
3.52 1172.7 60.5
2.91 1214.9 60.1
2.65 1257.8 59.6
2.58 1301.1 59.2
549.08 N 988.82 E
577.23 N 1020.78 E
606.19 N 1052.92 E
635.81 N 1085.21 E
666.00 N 1117.69 E
3340.0 64.32 46.72 2830.1
3390.0 65.62 46.39 2851.3
3440.0 65.89 46.12 2871.8
3490.0 67.07 45.84 2891.8
3540.0 68.29 45.50 2910.7
1303.4
1348.7
1394.2
1440.1
1486.3
2.46 1344.9 58.8
2.67 1389.2 58.4
.72 1433.8 58.0
2.41 1478.7 57.7
2.52 1523.9 57.3
696.66 N
727.82 N
759.34 N
791.20 N
823.52 N
1150.39 E
1183.28 E
1216.22 E
1249.19 E
1282.27 E
3590.0 69.78 44.89 2928.6
3640.0 70.79 44.27 2945.5
3690.0 72.85 43.82 2961.1
3740.0 73.82 43.15 2975.4
3790.0 74.65 42.58 2989.0
1533.0
1580.1
1627.6
1675.5
1723.6
3.20 1569.6 56.9
2.34 1615.6 56.6
4.21 1662.0 56.2
2.32 1708.8 55.9
2.00 1755.7 55.5
856.42 N
889.95 N
924.10 N
958.85 N
994.12 N
1315.40 E
1348.43 E
1381.46 E
1414.42 E
1447.15 E
3840.0 74.61 42.64 3002.3
3890.0 74.46 42.50 3015.6
3940.0 74.23 42.58 3029.1
3990.0 74.51 42.68 3042.6
4040.0 74.61 42.51 3055.9
1771.7
1819.9
1868.0
1916.1
1964.3
.14 1802.7 55.2
.41 1849.8 54.8
.48 1896.9 54.5
.58 1944.0 54.2
.38 1991.2 54.0
1029.61 N
1065.10 N
1100.57 N
1136.00 N
1171.47 N
1479.79 E
1512.39 E
1544.94 E
1577.55 E
1610.17 E
4090.0 75.01 42.52 3069.0
4140.0 75.34 42.58 3081.8
4190.0 75.27 42.62 3094.4
4240.0 75.02 43.25 3107.3
4290.0 74.53 43.71 3120.4
2012.5
2060.8
2109.2
2157.5
2205.7
.81 2038.6 53.7
.66 2086.0 53.4
.17 2133.5 53.2
1.32 2181.1 53.0
1.31 2228.7 52.8
1207.04 N
1242.65 N
1278.25 N
1313.63 N
1348.63 N
1642.79 E
1675.47 E
1708.21 E
1741.13 E
1774.33 E
A Gyroda t a Di r ec t iona i Survey
B.P. EXPLORATION
F PAD, WELL NO. MPF-57
MILNE POINT FIELD, ALASKA
Job Number: A0597GCE399
Page
MEASURED I N C L AZIMUTH VERTICAL
DEPTH DEPTH
feet deg. deg. feet
VERTICAL DOGLEG CLOSURE
SECTION SEVERITY DIST. AZIMUTH
feet deg./ feet deg.
100 ft.
HORIZONTAL
COORDINATES
feet
4340.0 74.43 43.64 3133.8
4390.0 74.48 43.53 3147.2
4440.0 73.35 43.66 3161.0
4490.0 73.02 43.97 3175.5
4540.0 72.99 44.23 3190.1
2253 . 9 . 24 2276 . 3 52 . 6
2302.1 .23 2323.9 52.4
2350.1 2.27 2371.4 52.2
2398 . 0 . 89 2418 . 7 52 . 0
2445.8 .50 2466.1 51.9
3.383.48 N
1418.37 N
1453.16 N
1487.70 N
1522.04 N
1807.60~E
1840.81 E
1873.94 E
1907.07 E
1940.35 E
4590.0 72.96 44.39 3204.7
4640.0 72.99 44.42 3219.4
4690.0 73.20 44.40 3233.9
4740.0 73.29 44.26 3248.3
4790.0 73.21 44.12 3262.7
2493.6 .31 2513.5 51.7
2541 . 4 . 07 2560 . 9 51 . 6
2589.2 .43 2608.4 51.5
2637.1 .33 2655.9 51.3
2685.0 .31 2703.4 51.2
1556.25 N
1590.40 N
1624.58 N
1658.82 N
1693.15 N
1973.75 E
2007.20 E
2040.68 E
2074.14 E
2107.51 E
4840 . 0 73 . 03 44 . 06 3277 . 3
4890.0 73.19 43.99 3291.8
4940 . 0 73 . 39 43 . 90 3306 . 2
4990.0 73.63 43.91 3320.4
5040.0 73.84 43.92 3334.4
2732.8 .38 2750.9 51.1
2780.7 .35 2798.4 51.0
2828.6 .44 2845.9 50.9
2876.5 .48 2893.5 50.7
2924 . 5 . 41 2941 . 2 50 . 6
1727.52 N
1761.92 N
1796.40 N
1830.94 N
1865.52 N
2140.80 E
2174.05 E
2207.28 E
2240.53 E
2273.82 E
5090.0 72.90 44.30 3348.7
5140.0 72.45 44.60 3363.6
5190.0 72.55 44.59 3378.6
5240.0 72.44 44.79 3393.6
5290.0 72.52 44.76 3408.7
2972.4 2.01 2988.8 50.5
3020.1 1.06 3036.2 50.4
3067.8 .20 3083.7 50.3
3115.5 .43 3131.1 50.3
3163.2 .15 3178.6 50.2
1899.92 N
1934.00 N
1967.96 N
2001.86 N
2035.70 N
2307.16 E
2340.59 E
2374.07 E
2407.60 E
2441.19 E
5340.0 72.48 44.78 3423.7
5390.0 72.57 44.63 3438.7
5440.0 72.71 44.59 3453.7
5490.0 73.00 44.50 3468.4
5540.0 72.96 44.41 3483.0
3210.9 .08 3226.1 50.1
3258.6 .34 3273.6 50.0
3306.3 .29 3321.1 49.9
3354.1 .60 3368.6 49.9
3401.9 .20 3416.2 49.8
2069.56 N
2103.45 N
2137.43 N
2171.48 N
2205.61 N
2474.77 E
2508.32 E
2541.83 E
2575.35 E
2608.83 E
A Gyroda t a Di re c t i ona i Survey
B.P. EXPLORATION
F PAD, WELL NO. MPF-57
MILNE POINT FIELD, ALASKA
Job Number: A0597GCE399
Page
MEASb~ED i N C L AZIMUTH VERTICAL
DEPTH DEPTH
feet deg. deg. feet
VERTICAL DOGLEG CLOSURE
SECTION SEVERITY DIST. AZIMUTH
feet deg./ feet deg.
100 ft.
HORIZONTAL
COORDINATES
feet
5590.0 73.00 44.42 3497.7
5640.0 72.79 44.54 3512.4
5690.0 73.14 44.59 3527.0
5740.0 73.28 44.75 3541.5
5790.0 73.19 44.75 3555.9
3449.7 .09 3463.8 49.7
3497.5 .46 3511.4 49.6
3545.3 .70 3559.1 49.6
3593.1 .42 3606.8 49.5
3641.0 .18 3654.5 49.4
2239.76 N 2642.29 E
2273.85 N 2675.78 E
2307.91 N 2709.33 E
2341.95 N 2742.98 E
2375.95 N 2776.69 E
5840 . 0 72 . 88 44 . 07 3570 . 5
5890.0 72.34 43.80 3585.4
5940 . 0 72 . 42 43 . 84 3600 . 5
5990 . 0 72 . 02 43 . 99 3615 . 8
6040 . 0 71 . 86 44 . 20 3631 . 3
3688.8 1.44 3702.1 49.4
3736 . 6 1 . 20 3749 . 6 49 . 3
3784.2 .18 3797.1 49.2
3831.8 .86 3844.5 49.2
3879.4 .51 3891.8 49.1
2410.11 N 2810.15 E
2444.47 N 2843.26 E
2478.86 N 2876.26 E
2513.16 N 2909.28 E
2547.30 N 2942.36 E
6090 . 0 72 . 27 44 . 36 3646 . 7
6140 . 0 72 . 49 44 . 38 3661 . 8
6190 . 0 72 . 87 44 . 46 3676 . 7
6240 . 0 73 . 02 44 . 55 3691 . 4
6290.0 73.11 44.40 3705.9
3926.9 .87 3939.2 49.1
3974.6 .44 3986.7 49.0
4022 . 3 . 77 4034 . 3 48 . 9
4070.1 .35 4082.0 48.9
4117.9 .33 4129.6 48.8
2581.35 N 2975.57 E
2615.42 N 3008.90 E
2649.51 N 3042.30 E
2683.61 N 3075.81 E
2717.74 N 3109.32 E
6340.0 73.40 44.47 3720.4
6390.0 73.25 44.49 3734.7
6440 . 0 73 . 66 44 . 57 3748 . 9
6490 . 0 73 . 77 44 . 56 3763 . 0
6540 . 0 73 . 00 44 . 26 3777 . 3
4165.8 .59 4177.4 48.8
4213.7 .29 4225.1 48.7
4261.6 .83 4272.9 48.7
4309.6 .22 4320.8 48.7
4357.6 1.64 4368.6 48.6
2751.93 N 3142.84 E
2786.10 N 3176.40 E
2820.27 N 3210.01 E
2854.47 N 3243.68 E
2888.69 N 3277.21 E
6590.0 72.81 44.21 3792.0
6640.0 72.87 44.16 3806.7
6690.0 72.69 44.18 3821.5
6740.0 73.31 44.22 3836.1
6790.0 73.23 44.04 3850.5
4405.3 .40 4416.3 48.6
4453.1 .16 4463.9 48.5
4500.9 .37 4511.5 48.5
4548.7 1.26 4559.2 48.4
4596.6 .38 4606.9 48.4
2922.93 N 3310.55 E
2957.19 N 3343.85 E
2991.45 N 3377.12 E
3025.73 N 3410.46 E
3060.10 N 3443.80 E
A Gyr oda t a Di r e c t i ona i Survey
B.P. EXPLORATION
F PAD, WELL NO. MPF-57
MILNE POINT FIELD, ALASKA
Job Number: A0597GCE399
Page
MEASURED i N C L AZIM~EH VERTICAL
DEPTH DEPTH
feet deg. deg. feet
VERTICAL DOGLEG CLOSURE
SECTION SEVERITY DIST. AZIMUTH
feet deg./ feet deg.
100 ft.
HORIZONTAL
COORDINATES
feet
6840.0 72.20 43.79 3865.4
6890.0 72.40 43.92 3880.6
6940.0 72.34 44.03 3895.7
6990.0 72.30 44.30 3910.9
7040.0 72.63 44.41 3926.0
4644 . 3 2 . 12 4654 . 5 48 . 3
4691.9 .49 4702.0 48.3
4739 . 6 . 24 4749 . 6 48 . 2
4787 . 2 . 52 4797.1 48 . 2
4834 . 9 . 68 4844 . 6 48 . 2
3094.49 N 3476.91 E
3128.84 N 3509.91 E
3163.13 N 3543.00 E
3197.30 N 3576.19 E
3231.39 N 3609.52 E
7090.0 72.55 44.17 3940.9
7140.0 72.40 43.74 3956.0
7190.0 72.53 43.99 3971.1
7240.0 72.39 44.12 3986.1
7290.0 72.81 44.42 4001.1
4882.6 .48 4892.2 48.1
4930.3 .87 4939.8 48.1
4978.0 .53 4987.3 48.0
5025.6 .39 5034.9 48.0
5073.3 1.03 5082.5 48.0
3265.54 N 3642.84 E
3299.87 N 3675.93 E
3334.24 N 3708.97 E
3368.50 N 3742.12 E
3402.67 N 3775.43 E
7340.0 72.79 44.28 4015.9
7390.0 72.22 43.61 4030.9
7440.0 71.90 43.50 4046.3
7490.0 71.77 43.53 4061.9
7540.0 71.56 43.28 4077.6
5121 . 1 . 28 5130 . 2 47 . 9
5168.8 1.70 5177.8 47.9
5216 . 4 . 69 5225 . 2 47 . 9
5263 . 9 . 26 5272 . 6 47 . 8
5311.3 .63 5319.9 47.8
3436.82 N 3808.82 E
3471.15 N 3841.91 E
3505.63 N 3874.69 E
3540.08 N 3907.40 E
3574.56 N 3940.01 E
7590.0 71.93 42.76 4093.3
7640.0 71.67 42.66 4108.9
7690.0 71.39 42.59 4124.7
7740.0 72.06 42.61 4140.4
7790.0 72.83 42.54 4155.5
7840 . 0 72 . 89 42 . 59 4170 . 2
7890 . 0 72 . 90 42 . 47 4184 . 9
7940 . 0 72 . 80 42 . 31 4199 . 7
7990 . 0 72 . 45 42 . 19 4214 . 6
8040.0 72.32 42.09 4229.7
5358.8 1.23 5367.2 47.7
5406.3 .55 5414.5 47.7
5453.6 .58 5461.8 47.7
5501.1 1.35 5509.1 47.6
5548.7 1.54 5556.5 47.6
5596 . 5 . 17 5604 . 1 47 . 5
5644.3 .23 5651.8 47.5
5692.0 .35 5699.3 47.4
5739 . 7 . 74 5746 . 9 47.4
5787.3 .33 5794.3 47.4
3609.28 N 3972.41 E
3644.18 N 4004.6~ E
3679.07 N 4036.~, E
3714.02 N 4068 - E
3749.13 N 4101'~
3784.32 N 4133~ Eo
3819.54 N 4165~;~
3854.82 N
3890.14 N 4230.~
3925.48 N 4262..~ E
..
A Gyroda t a D i r e c t i ona i Survey
B.P. EXPLORATION
F PAD, WELL NO. MPF-57
MILNE POINT FIELD, ALASKA
Job Number: A0597GCE399
Page
MEASURED i N C L AZIM%VFH VERTICAL
DEPTH DEPTH
feet deg. deg. feet
VERTICAL DOGLEG CLOSURE
SECTION SEVERITY DIST. AZIMUTH
feet deg./ feet deg.
100 ft.
H 0 R I Z 0 N T A L
COORDINATES
feet
8090.0 71.96 42.11 4245.1
8140.0 72.48 42.27 4260.3
8190.0 72.22 42.20 4275.5
8240.0 72.12 42.18 4290.8
8290.0 72.48 42.12 4306.0
8340.0 73.54 41.87 4320.6
8390.0 73.55 41.69 4334.8
8440.0 73.08 41.64 4349.1
8490.0 73.15 41.60 4363.7
8540.0 73.74 41.71 4377.9
5834 . 8 . 70 5841 . 7 47 . 3
5882.4 1.08 5889.1 47.3
5930 . 0 . 54 5936 . 6 47 . 2
5977.6 .21 5984.0 47.2
6025.2 .74 6031.5 47.1
6072.9 2.16 6079.1 47.1
6120.8 .35 6126.8 47.1
6168.7 .94 6174.5 47.0
6216.5 .17 6222.2 47.0
6264.3 1.19 6269.9 46.9
3960.79 N
3996.07 N
4031.34 N
4066.61 N
4101.93 N
4137.47 N
4173.23 N
4209.01 N
4244.77 N
4280.58 N
4293.93 E
4325.91 E
4357.93 E
4389.90 E
4421.86 E
4453.85 E
4485.80 E
4517.64 E
4549.42 E
4581.27 E
8590.0 73.26 41.57 4392.1
8640.0 72.88 41.62 4406.7
8690.0 72.92 41.42 4421.4
8740.0 73.32 41.31 4435.9
8790.0 72.99 41.17 4450.4
6312.2 .99 6317.6 46.9
6360.0 .77 6365.2 46.9
6407.7 .40 6412.8 46.8
6455.5 .83 6460.5 46.8
6503.2 .71 6508.1 46.7
4316.41 N
4352.18 N
4387.96 N
4423.87 N
4459.86 N
4613.13 E
4644.88 E
4676.56 E
4708.18 E
4739.72 E
8840 . 0 72 . 49 41 . 22 4465 . 2
8890.0 72.47 41.63 4480.3
8940 . 0 72 . 27 41 . 75 4495 . 4
8990.0 71.78 41.61 4510.8
9040 . 0 71 . 47 41 . 76 4526 . 6
6550.9 1.01 6555.6 46.7
6598.5 .79 6603.1 46.7
6646.1 .45 6650.6 46.6
6693.6 1.02 6698.0 46.6
6741 . 0 . 67 6745 . 2 46 . 6
4495.79 N
4531.54 N
4567.12 N
4602.65 N
4638.08 N
4771.17 E
4802.71 E
4834.41 E
4866.03 E
4897.59 E
9090.0 71.79 42.41 4542.4
9140 . 0 71 . 55 42 . 62 4558 . 1
9190 . 0 72 . 38 42 . 84 4573 . 6
9240 . 0 72 . 73 42 . 93 4588 . 5
9290.0 73.39 43.03 4603.1
6788.4 1.40 6792.5 46.5
6835.9 .62 6839.9 46.5
6883.4 1.72 6887.3 46.5
6931.1 .71 6934.9 46.4
6978.9 1.34 6982.7 46.4
4673.30 N
4708.29 N
4743.21 N
4778.16 N
4813.16 N
4929.39 E
4961.47 E
4993.73 E
5026.19 E
5058.80 E
A Gyro da t a D i r e c t i ona i Survey
B.P. EXPLORATION
F PAD, WELL NO. MPF-57
MILNE POINT FIELD, ALASKA
Job Number: A0597GCE399
Page
MEASURED I N C L AZIMUTH VERTICAL
DEPTH DEPTH
feet deg. deg. feet
VERTICAL
SECTION
feet
DOGLEG CLOSURE
SEVERITY DIST. AZIMUTH
deg./ feet deg.
100 ft.
HORIZONTAL
COORDINATES
feet
9340.0 72.97 43.00 4617.6
9390.0 72.65 42.89 4632.3
9440.0 72.58 42.92 4647.3
9490.0 72.02 42.93 4662.5
9540.0 72.27 42.78 4677.8
7026.7
7074.5
7122.2
7169.8
7217.3
.85 7030.5 46.4
.67 7078.1 46.4
.15 7125.8 46.4
.12 7173.3 46.3
.57 7220.8 46.3
4848.15 N
4883.12 N
4918.07 N
4952.95 N
4987.84 N
5091.45 E
5123.99 E
5156.47 E
5188.91 E
5221.28 E
9590.0 72.00 42.47 4693.2
9640.0 72.25 42.22 4708.5
9690.0 73.20 41.74 4723.4
9740.0 72.99 41.53 4737.9
9790.0 72.92 41.43 4752.5
7264.9
7312.5
7360.2
7407.9
7455.7
.79 7268.3 46.3
.69 7315.8 46.3
.11 7363.4 46.2
.58 7411.1 46.2
.25 7458.7 46.2
5022.85 N
5058.02 N
5093.51 N
5129.27 N
5165.08 N
5253.51 E
5285.57 E
5317.50 E
5349.28 E
5380.95 E
9840.0 73.23 42.00 4767.1
9890.0 73.90 42.52 4781.2
9940.0 73.35 42.16 4795.3
9990.0 73.18 41.91 4809.7
10040.0 73.34 42.58 4824.1
7503.4
7551.4
7599.3
7647.1
7695.0
.26 7506.4 46.1
.67 7554.3 46.1
.30 7602.1 46.1
.58 7649.9 46.1
.31 7697.7 46.0
5200.79 N
5236.28 N
5271.74 N
5307.31 N
5342.75 N
5412.78 E
5445.03 E
5477.34 E
5509.40 E
5541.59 E
10090.0 73.58 42.92 4838.4
10140.0 74.11 43.84 4852.3
10190.0 73.79 43.92 4866.1
10240.0 73.59 43.78 4880.1
10290.0 73.50 43.71 4894.3
7742.9
7790.9
7839.0
7886.9
7934.9
.81 7745.5 46.0
.06 7793.5 46.0
.66 7841.5 46.0
.48 7889.5 46.0
.24 7937.4 46.0
5377.95 N
5412.86 N
5447.49 N
5482.10 N
5516.75 N
5574.12 E
5607.11 E
5640.41 E
5673.66 E
5706.81 E
10340.0 73.41 43.56 4908.6
10390.0 73.26 43.68 4922.9
10440.0 73.71 44.62 4937.1
10490.0 73.52 44.41 4951.2
10540.0 73.32 43.99 4965.5
7982.8
8030.7
8078.6
8126.6
8174.5
.34 7985.3 46.0
.38 8033.1 45.9
.02 8081.1 45.9
.55 8129.0 45.9
.90 8176.9 45.9
5551.44 N
5586.12 N
5620.51 N
5654.72 N
5689.07 N
5739.88 E
5772.92 E
5806.31 E
5839.94 E
5873.35 E
A Gyroda t a Di re c t i ona i Survey
B.P. EXPLORATION
F PAD, WELL NO. MPF-57
MILNE POINT FIELD, ALASKA
Job Number: A0597GCE399
Page
MEASURED I N C L AZIMUTH VERTICAL
DEPTH DEPTH
feet deg. deg. feet
VERTICAL
SECTION
feet
DOGLEG CLOSURE
SEVERITY DIST. AZIM~£H
deg./ feet deg.
100 ft.
HORIZONTAL
COORDINATES
feet
10590.0 73.19 44.07 4979.9
10640.0 73.54 44.64 4994.2
10690.0 73.34 44.54 5008.4
10740.0 72.75 44.19 5023.0
10790.0 72.29 44.06 5038.1
8222.4
8270.3
8318.2
8366.1
8413.8
.30 8224.8 45.9
.29 8272.7 45.9
.44 8320.6 45.9
.36 8368.4 45.9
.95 8416.0 45.9
5723.49 N
5757.75 N
5791.88 N
5826.07 N
5860.30 N
5906.63 E
5940.13 E
5973.77 E
6007.21 E
6040.42 E
10840.0 71.99 43.83 5053.4
10890.0 71.83 43.66 5068.9
10940.0 71.62 43.40 5084.6
10990.0 72.30 43.08 5100.1
11040.0 72.62 42.87 5115.1
8461.3
8508.9
8556.3
8603.9
8651.5
.74 8463.6 45.9
.45 8511.1 45.8
.65 8558.5 45.8
.49 8606.0 45.8
.75 8653.7 45.8
5894.57 N
5928.90 N
5963.32 N
5997.96 N
6032.84 N
6073.44 E
6106.31 E
6139.01 E
6171.58 E
6204.08 E
11090.0 72.09 42.73 5130.3
11140.0 72.12 42.71 5145.7
11190.0 73.13 43.11 5160.6
11240.0 73.20 42.97 5175.1
11290.0 73.00 42.83 5189.6
8699.1
8746.7
8794.4
8842.2
8890.1
.10 8701.2 45.8
.08 8748.7 45.8
.15 8796.4 45.8
.31 8844.2 45.7
.47 8892.0 45.7
6067.80 N
6102.75 N
6137.70 N
6172.68 N
6207.73 N
6236.45 E
6268.73 E
6301.22 E
6333.88 E
6366.44 E
11340.0 72.79 42.93 5204.3
11390.0 73.38 43.86 5218.9
11440.0 73.13 43.76 5233.3
11490.0 72.95 43.67 5247.9
11540.0 72.47 43.38 5262.7
8937.8
8985.7
9033.5
9081.4
9129.1
.46 8939.7 45.7
2.14 8987.5 45.7
.55 9035.4 45.7
.39 9083.2 45.7
1.10 9130.9 45.7
6242.75 N
6277.51 N
6312.06 N
6346.63 N
6381.24 N
6398.96 E
6431.82 E
6464.97 E
6498.02 E
6530.90 E
11590.0 72.26 43.26 5277.9
11640.0 72.05 42.93 5293.2
11690.0 71.78 42.74 5308.7
11740.0 72.51 42.75 5324.0
11790.0 73.03 42.74 5338.9
9176.7
9224.3
9271.8
9319.4
9367.1
.48 9178.5 45.7
.76 9226.0 45.6
.65 9273.5 45.6
1.45 9321.0 45.6
1.05 9368.7 45.6
6415.91 N
6450.67 N
6485.52 N
6520.47 N
6555.54 N
6563.59 E
6596.11 E
6628.42 E
6660.72 E
6693.14 E
A Gyrodat a Di rec t iona i Survey
B.P. EXPLORATION
F PAD, WELL NO. MPF-57
MILNE POINT FIELD, ALASKA
Job Number: A0597GCE399
Page
10
MEASURED I
DEPTH
feet
N C L AZIMUTH VERTICAL
DEPTH
deg. deg. feet
VERTICAL
SECTION
feet
DOGLEG CLOSURE
SEVERITY DIST. AZIMUTH
deg./ feet deg.
100 ft.
H O R I Z O N'T A L
COORDINATES
feet
11840.0
11890.0
11940.0
11990.0
12040.0
73.86 43.26 5353.1
74 . 47 43 . 38 5366 . 7
74.35 43.29 5380.2
73 . 92 43 . 04 5393 . 8
73 . 59 42 . 73 5407 . 8
9415
9463
9511
9559
9607
.0
.1
.3
.4
.3
1.93 9416.6 45.6
1.25 9464.7 45.6
.31 9512.8 45.6
.98 9560.9 45.5
.88 9608.8 45.5
6590.59 N 6725.82 E
6625.58 N 6758.83 E
6660.61 N 6791.88 E
6695.69 N 6824.78 E
6730.87 N 6857.45 E
12090
12140
12190
12240
12290
.0
.0
.0
.0
.0
73.14 42.51 5422.1
73.09 42.23 5436.7
72.66 42.18 5451.4
73.25 43.19 5466.0
72.81 42.9.4 5480.6
9655
9703
9750
9798
9846
.2
.0
.8
.5
.4
1.01 9656.7 45.5
.55 9704.4 45.5
.85 9752.1 45.5
2.26 9799.9 45.5
1.01 9847.7 45.5
6766.12 N
6801.47 N
6836.86 N
6872.00 N
6906.94 N
6889.89 E
6922.13 E
6954.23 E
6986.64 E
7019.29 E
12340
12390
12440
12490
12540
.0
.0
.0
.0
.0
72.72 42.73 5495.5
72.41 42.99 5510.4
72.57 43.54 5525.5
72.21 43.24 5540.6
71.78 42.92 5556.1
9894
9941
9989
10037
10084
.1
.8
.4
.1
.6
.44 9895.4 45.4
.80 9943.0 45.4
1.10 9990.7 45.4
.92 10038.3 45.4
1.06 10085.8 45.4
6941.97 N
6976.93 N
7011.65 N
7046.29 N
7081.02 N
7051.76 E
7084.21 E
7116.89 E
7149.63 E
7182.11 E
12590
12640
12690
12740
12790
.0
.0
.0
.0
.0
72.00 43.17 5571.6
72.06 43.23 5587.0
71.61 42.88 5602.6
71.34 42.58 5618.5
71.69 43.39 5634.4
10132
10179
10227
10274
10322
.1
.7
.2
.6
.0
.65 10133.3 45.4
.15 10180.8 45.4
1.11 10228.3 45.4
.79 10275.6 45.4
1.69 10323.0 45.4
7115.74 N
7150.41 N
7185.13 N
7219.95 N
7254.64 N
7214.55 E
7247.11 E
7279.54 E
7311.71 E
7344.04 E
12840
12890
12940
12990
13040
.0
.0
.0
.0
.0
71.52 43.47 5650.1
71.11 43.27 5666.2
70.64 42.94 5682.5
70.44 43.48 5699.2
70.53 44.33 5715.9
10369.4
10416.8
10464.0
10511.1
10558.2
.38 10370.4 45.3
· 89 10417.8 45.3
1.14 10465.0 45.3
1.10 10512.1 45.3
1.62 10559.2 45.3
7289.09 N
7323.52 N
7358.01 N
7392.37 N
7426.33 N
7376.66 E
7409.19 E
7441.47 E
7473.74 E
7506.42 E
A Gyrodat a Di rec t i ona i Survey
B.P. EXPLORATION
F PAD, WELL NO. MPF-57
MILNE POINT FIELD, ALASKA
Job Number: A0597GCE399
Page
11
MEASURED ! N C L AZiMI~H VERTICAL
DEPTH DEPTH
feet deg. deg. feet
VERTiCAI~ DOGLEG CLOSURE
SECTION SEVERITY DIST. AZIMUTH
feet deg./ feet deg.
100 ft.
H O R I Z 0 N T A L
COORDINATE
feet
13090.0 70.21 44.05 5732.7
13140.0 70.34 43.79 5749.6
13190.0 71.80 43.66 5765.8
13240.0 71.37 43.44 5781.6
13290.0 70.87 43.06 5797.8
10605.3 .82 10606.3 45.3
10652.4 .55 10653.3 45.3
10699.7 2.92 10700.6 45.3
10747.1 .95 10748.0 45.3
10794.4 1.23 10795.3 45.3
7460.09 N 7539.25 E
7494.00 N 7571.90 E
7528.17 N 7604.59 E
7562.56 N 7637.27 E
7597.02 N 7669.69 E
13340.0 71.57 42.99 5813.9
13390.0 72.36 43.17 5829.4
13440.0 72.01 43.04 5844.6
13490.0 71.66 42.73 5860.2
13540.0 72.59 43.05 5875.6
10841.7 1.41 10842.6 45.3
10889.3 1.62 10890.1 45.3
10936.8 .74 10937.7 45.2
10984.3 .93 10985.2 45.2
11031.9 1.97 11032.7 45.2
7631.62 N
7666.35 N
7701.10 N
7735.91 N
7770.78 N
7701.99 E
7734.46 E
7766.99 E
7799.32 E
7831.71 E
13590.0 73.14 43.30 5890.3
13640.0 72.74 43.12 5905.0
13690.0 72.39 43.08 5920.0
13740.0 73.24 44.18 5934.7
13790.0 73.15 44.25 5949.2
11079.7 1.19 11080.5 45.2
11127.5 .88 11128.2 45.2
11175.1 .70 11175.9 45.2
11222.9 2.71 11223.6 45.2
11270.8 .24 11271.5 45.2
7805.62 N
7840.46 N
7875.29 N
7909.86 N
7944.17 N
7864.41 E
7897.13 E
7929.73 E
7962.69 E
7996.06 E
13840 . 0 72 . 96 43 . 92 5963 . 8
13890 . 0 72 . 59 43 . 56 5978 . 6
13940 . 0 72 . 27 43 . 24 5993 . 7
13990 . 0 71 . 73 42 . 92 6009 . 1
14040 . 0 71 . 30 42 . 59 6025 . 0
11318.6 .73 11319.3 45.2
11366.3 1.00 11367.1 45.2
11414.0 .89 11414.7 45.2
11461.5 1.24 11462.2 45.2
11508.9 1.06 11509.6 45.1
7978.52 N
8013.03 N
8047.66 N
8082.40 N
8117.22 N
8029.34 E
8062.36 E
8095.11 E
8127.59 E
8159.78 E
14090.0 70.82 42.34 6041
14140.0 70.99 43.51 6057
14190.0 70.98 43.84 6073
14240.0 70.48 43.57 6090
14290.0 69.81 43.33 6107
· 2 ~ 11556 . 2
· 5~ 11603.4
.8~
~ 1165,Q~.7
· 3 116
117~4~.~
1.07 11556.9 45.1
2.23 11604.1 45.1
.63 11651.3 45.1
1.12 11698.5 45.1
1.42 11745.5 45.1
8152.10 N
8186.70 N
8220.89 N
8255.01 N
8289.15 N
8191.71 E
8223..89 E
8256.53 E
8289.15 E
8321.49 E
A Gyroda t a Di r e c t i ona i Survey
B.P. EXPLORATION
F PAD, WELL NO. MPF-57
MILNE POINT FIELD, ALASKA
Job Number: A0597GCE399
Page
12
MEASURED I N C L AZIMUTH VERTICAL
DEPTH DEPTH
feet deg. deg. feet
VERTICAL DOGLEG CLOSURE
SECTION SEVERITY DIST. AZIMUTH
feet deg./ feet deg.
100 ft.
HORIZONTAL
COORDINATES
feet
14340.0 69.31 43.09 6124.8
14390.0 69.01 42.95 6142.6
14440.0 68.51 42.87 6160.7
14490.0 68.07 42.76 6179.2
14540.0 67.47 42.99 6198.1
11791.8 1.09 11792.3 45.1
11838.5 .65 11839.0 45.1
11885.1 1.01 11885.6 45.1
11931.5 .91 11932.0 45.1
11977.8 1.28 11978.3 45.1
8323.30 N
8357.46 N
8391.59 N
8425.67 N
8459.59 N
8353.57 E
8385.45 E
8417.18 E
8448.76 E
8480.25 E
14590.0 65.82 43.47 6217.9
14640.0 64.95 43.55 6238.7
14690.0 63.66 43.95 6260.4
14740.0 62.76 44.18 6282.9
14790.0 61.48 44.55 6306.3
12023.6 3.40 12024.2 45.1
12069.1 1.75 12069.6 45.1
12114.1 2.67 12114.6 45.1
12158.8 1.85 12159.3 45.0
12203.0 2.65 12203.5 45.0
8493.03 N
8526.00 N
8558.55 N
8590.62 N
8622.22 N
8511.69 E
8542.98 E
8574.14 E
8605.18 E
8636.08 E
14840 . 0 60 . 17 44 . 78 6330 . 7
14890 . 0 58 . 99 45 . 50 6356 . 0
14940 . 0 57 . 36 45 . 63 6382 . 4
14990 . 0 56 . 26 45 . 70 6409 . 7
15040 . 0 54 . 37 45 . 93 6438 . 2
12246.6 2.64 12247.1 45.0
12289.7 2.68 12290.2 45.0
12332.2 3.27 12332.7 45.0
12374.0 2.19 12374.6 45.0
12415.2 3.81 12415.7 45.1
8653.27 N
8683.69 N
8713.43 N
8742.67 N
8771.32 N
8666.77 E
8697.33 E
8727.66 E
8757.59 E
8787.07 E
15090.0 53.18 46.30 6467.7
15140.0 51.29 47.16 6498.4
15190.0 50.28 47.43 6530.0
15240.0 48.53 48.36 6562.5
15290.0 47.45 48.25 6596.0
12455.5 2.46 12456.0 45.1
12495.0 4.01 12495.5 45.1
12533.7 2.06 12534.2 45.1
12571.6 3.78 12572.1 45.1
12608.6 2.17 12609.2 45.1
8799.29 N
8826.38 N
8852.66 N
8878.12 N
8902.83 N
8816.14 E
8844.91 E
8873.38 E
8901.54 E
8929.28 E
15340.0 45.52 48.57 6630.4
15390.0 44.41 47.91 6665.8
15440 . 0 42 . 85 47 . 93 6702 . 0
15490 . 0 41 . 68 47.06 6739 . 0
15540 . 0 40 . 15 46 . 64 6776 . 8
12644.8 3.88 12645.4 45.1
12680.1 2.40 12680.7 45.1
12714.5 3.13 12715.2 45.1
12748.1 2.62 12748.7 45.1
12780.8 3.11 12781.5 45.1
8926.90 N
8950.43 N
8973.54 N
8996.26 N
9018.65 N
8956.39 E
8982.75 E
9008.36 E
9033.15 E
9057.04 E
A Gyroda t a D i r e c t i ona i Survey
B.P. EXPLORATION
F PAD, WELL NO. MPF-57
MILNE POINT FIELD, ALASKA
Job Number: A0597GCE399
Page
13
MEASURED I N C L AZIMUTH VERTICAL
DEPTH DEPTH
feet deg. deg. feet
VERTICAL DOGLEG CLOSURE
SECTION SEVERITY DIST. AZIMUTH
feet deg./ feet deg.
100 ft.
H 0 R I Z 0N'TAL
COORDINATES
feet
15590 . 0 38 · 70 46 . 52 6815 . 4
15640 . 0 37 . 68 46 . 68 6854 . 7
15690 . 0 35 · 61 47 . 28 6894 . 8
15740 . 0 34 . 64 47 . 75 6935 . 7
15790 . 0 33 . 96 47 . 50 6977 . 0
12812.5 2.90 12813.2 45.1
12843.4 2.06 12844.1 45.1
12873.2 4.20 12873.9 45.1
12902.0 2.00 12902.7 45.1
12930.1 1.39 12930.8 45.1
9040.48 N
9061.72 N
9082.07 N
9101.51 N
9120.50 N
9080.11 E
9102.57 E
9124.38 E
9145.59 E
9166.41 E
15840.0 33.32 47.40 7018.6
15890.0 32.98 47.23 7060.5
15940.0 32.51 47.18 7102.5
15990.0 31.83 47.24 7144.9
16040.0 31.34 47.42 7187.4
12957.8 1.28 12958.5 45.1
12985.1 .70 12985.8 45.2
13012.1 .95 13012.9 45.2
13038.7 1.35 13039.5 45.2
13064.8 1.01 13065.6 45.2
9139.23 N
9157.76 N
9176.14 N
9194.22 N
9211.97 N
9186.81 E
9206.92 E
9226.76 E
9246.30 E
9265.56 E
16090.0 30.98 47.63 7230.2
16140.0 30.73 46.95 7273.2
16190.0 30.23 46.82 7316.2
16240.0 29.90 46.95 7359.5
16290.0 29.38 46.70 7403.0
13090.7 .75 13091.5 45.2
13116.3 .85 13117.1 45.2
13141.6 1.00 13142.5 45.2
13166.7 .69 13167.5 45.2
13191.4 1.06 13192.2 45.2
9229.44 N
9246.83 N
9264.17 N
9281.29 N
9298.20 N
9284.64 E
9303.48 E
9322.00 E
9340.28 E
9358.31 E
16340.0 28.90 46.60 7446.6
16390.0 28.56 46.32 7490.5
16440.0 27.84 46.12 7534.6
16490.0 27.19 46.00 7578.9
16534.0 26.68 45.39 7618.1
13215.7 .96 13216.6 45.2
13239.7 .73 13240.6 45.2
13263.3 1.46 13264.2 45.2
13286.4 1.32 13287.3 45.2
13306.3 1.31 13307.2 45.2
9314.92 N
9331.48 N
9347.82 N
9363.85 N
9377.77 N
9376.02 E
9393.44 E
9410.50 E
9427.14 E
9441.40 E
Final Station Closure: Distance: 13307.24 ft Az: 45.19 deg.
A Gyroda t a Di r e c t i ona i Survey
for
B.P. EXPLORATION
F PAD, WELL NO. MPF-57
MILNE POINT FIELD, ALASKA
Job Number: SUB399
Run Date: il-May-97 21:00:00
Surveyor: TOM STODDARD
Calculation Method: MINIMUM CURVATURE
Survey Latitude: 70.505000 deg. N
Sub-sea Correction from Vertical Reference: 40.8 ft.
Azimuth Correction:
Gyro: Bearings are Relative to True North
Proposed Well Direction: 44.530 deg
Vertical Section Calculated from Well Head Location
Closure Calculated from Well Head Location
Horizontal Coordinates Calculated from Local Horizontal Reference
A Gyrodat a D i re c t i ona i Survey
B.P. EXPLORATION
F PAD, WELL NO. MPF-57
MILNE POINT FIELD, ALASKA
Job Number: SUB399
Page
SUBSEA
DEPTH
feet
I N C L AZIMUTH VERTICAL
DEPTH
deg. deg. feet
VERTICAL
SECTION
feet
DOGLEG CLOSURE
SEVERITY DIST. AZIMUTH
deg./ feet deg.
100 ft.
HORIZONTAL
COORDINATES
feet
-40
100
200
300
400
.8
.0
.0
.0
.0
0.00 0.00 0.0
.22 180.70 140.8
.24 160.07 240.8
.66 101.61 340.8
1.47 62.50 440.8
0.0 0.00 0.0 0.0
-. 2 .14 .5 179.0
-.5 .14 .9 176.4
-. 1 .61 1.3 146.0
1.5 .90 3.4 99.6
0.00 N 0.00 E
.34 S .00 W
.72 S .06 E
.76 S .63 E
.59 N 2.25 E
500
600
700
800
900
.0 2.42 62.17 540.8
.0 3.84 66.63 640.8
.0 5.25 69.68 740.8
.0 6.53 72.12 840.8
.0 8.87 73.89 940.8
4
9
17
26
38
.8
.9
.1
.4
.2
.96 7.6 75.6
1.43 14.2 69.8
1.42 23.2 69.1
1.30 34.7 69.8
2.33 50.2 70.8
1.54 N 5.27 E
3.81 N 10.22 E
6.70 N 17.62 E
10.03 N 27.39 E
13.93 N 40.33 E
1000
1100
1200
1300
1400
.0 11.58 75.91 1040.8
.0 13.33 77.60 1140.8
· 0 14.96 78.05 1240.8
.0 17.10 77.03 1340.8
· 0 20 . 54 73 . 71 1440 . 8
53
72
93
117
146
.7
.4
.2
.2
.6
2.70 69.9 72.1
1.73 92.5 73.4
1.80 118.0 74.4
2.14 147.0 75.1
3.41 181.0 75.1
18.55 N 57.74 E
23.56 N 79.25 E
28.81 N 103.56 E
34.98 N 131.62 E
43.66 N 164.60 E
1500
1600
1700
1800
1900
.0 21.75 72.16 1540.8
.0 23.11 70.97 1640.8
.0 25.83 67.68 1740.8
.0 27.12 65.73 1840.8
.0 30.52 63.10 1940.8
181
217
258
304
356
.0
.4
.5
.8
.3
· 49 217.8 74.7
2 . 00 256 . 0 74 . 2
3.08 297.6 73.5
1.20 364.9 72.5
3.59 414.1 71.4
55.25 N 201.95 E
68.10 N 240.80 E
83.99 N 283.26 E
103.83 N 329.02 E
127.48 N 378.45 E
2000.0 34.15 61.00 2040.8
2100.0 36.76 59.38 2140.8
2200.0 39.45 58.44 2240.8
2300.0 42.80 56.32 2340.8
2400.0 46.30 54.53 2440.8
416.7
485.9
561.5
646.9
743.1
2.96 467.9 70.1
1.37 555.1 68.7
2.42 616.6 67.5
2.45 714.9 66.2
3.25 819.7 64.9
157.19 N 434.35 E
193.18 N 496.45 E
233.38 N 563.48 E
280.78 N 637.10 E
336.22 N 717.86 E
A Gyroda t a D i r e c t iona i Survey
B.P. EXPLORATION
F PAD, WELL NO. MPF-57
MILNE POINT FIELD, ALASKA
Job Number: SUB399
Page
SUBSEA
DEPTH
feet
I N C L AZIMUTH VERTICAL
DEPTH
deg. deg. feet
VERTICAL
SECTION
feet
DOGLEG CLOSURE
SEVERITY DIST. AZIMUTH
deg./ feet deg.
100 ft.
HORIZONTAL
COORDINATES
feet
2500
2600
2700
2800
2900
.0
.0
.0
.0
.0
50.24 52.90 2540.8 853.8
54.79 50.67 2640.8 983.2
59.49 48.13 2740.8 1136.1
64.98 46.55 2840.8 1326.3
70.51 44.44 2940.8 1567.0
2.47 931.5 63.5
2.89 1049.5 62.1
3.39 1214.9 60.4
2.56 1389.2 58.6
2.58 1615.6 56.7
402.64 N 808.25 E
483.27 N 910.74 E
583.08 N 1027.27 E
712.40 N 1167.00 E
880.61 N 1339.23 E
3000
3100
3200
3300
3400
.0
.0
.0
.0
.0
74.47 42.67 3040.8 1909.9
74.46 43.58 3140.8 2279.1
73.24 44.33 3240.8 2612.1
73.42 44.09 3340.8 2946.0
72.59 44.63 3440.8 3265.2
.57 1944.0 54.3
.23 2323.9 52.5
.38 2655.9 51.4
.13 2988.8 50.6
.33 3321.1 50.0
1131.38 N
1401.76 N
1640.91 N
1880.99 N
2108.16 N
1573.30 E
1825.00 E
2056.64 E
2288.81 E
2512.96 E
3500
3600
3700
3800
3900
.0
.0
.0
.0
.0
73.28 44.75 3540.8 3591.0
72.11 44.30 3640.8 3908.7
73.43 44.52 3740.8 4234.2
73.29 44.16 3840.8 4564.2
72.55 44.17 3940.8 4882.2
.43 3606.8 49.'5
· 73 3939.2 49.1
.52 4272.9 48.7
· 97 4606.9 48.4
· 48 4892.2 48.1
2340.40 N
2568.30 N
2800.74 N
3036.88 N
3265.24 N
2741.44 E
2962.85 E
3190.79 E
3421.27 E
3642.54 E
4000
4100
4200
4300
4400
.0
.0
.0
.0
.0
72.01 43.54 4040.8 5199.4
72.08 42.61 4140.8 5502.3
72.06 42.11 4240.8 5821.6
73.35 41.67 4340.8 6140.9
73.21 41.26 4440.8 6471.7
.05 5225.2 47.9
.35 5556.5 47.6
.60 5841.7 47.3
.60 6174.5 47.0
.79 6508.1 46.8
3493.34 N
3714.94 N
3950.96 N
4188.22 N
4436.07 N
3863.01 E
4069.72 E
4285.05 E
4499.14 E
4718.87 E
4500.0
4600.0
4700.0
4800.0
4900.0
71.76 42.35 4540.8 6783.7
72.61 42.90 4640.8 7101.4
72.98 41.51 4740.8 7417.4
73.67 43.08 4840.8 7751.2
73.66 44.56 4940.8 8091.2
1.33 6792.5 46.5
.37 7125.8 46.4
.51 7458.7 46.2
1.03 7793.5 46.0
1.64 8129.0 45.9
4669.83 N
4902.89 N
5136.38 N
5384.03 N
5629.49 N
4926.26 E
5142.37 E
5355.57 E
5579.87 E
5815.13 E
A Gyroda t a D i r e c t i ona i Survey
B.P. EXPLORATION
F PAD, WELL NO. MPF-57
MILNE POINT FIELD, ALASKA
Job Number: SUB399
Page
SUBSEA
DEPTH
feet
I N C L AZIMUTH VERTICAL
DEPTH
deg. deg. feet
VERTICAL
SECTION
feet
DOGLEG CLOSURE
SEVERITY DIST. AZIMUTH
deg./ feet deg.
100 ft.
HORIZONTAL
COORDINATES
feet
5000
5100
5200
5300
5400
.0 72.23 44.02 5040.8 8422.3
.0 72.11 42.71 5140.8 8731.6
.0 73.04 43.71 5240.8 9058.2
.0 73.14 42.82 5340.8 9373.7
.0 72.97 42.22 5440.8 9716.4
.91 8463.6 45.9
.40 8748.7 45.8
.46 9083.2 45.7
1.17 9416.6 45.6
.63 9752.1 45.5
5866.44 N 6046.34 E
6091.68 N 6258.50 E
6329.88 N 6482.00 E
6560.33 N 6697.60 E
6811.39 N 6931.13 E
5500
5600
5700
5800
5900
.0 72.21 43.24 5540.8 10037.7
.0 71.62 43.42 5640.8 10341.3
.0 70.28 43.93 5740.8 10627.9
.0 72.10 43.08 5840.8 10924.9
.0 73.20 44.21 5940.8 11243.0
.92 10085.8 45.4
1.16 10370.4 45.3
.69 10653.3 45.3
.96 10937.7 45.2
1.67 11271.5 45.2
7046.71 N
7268.69 N
7476.36 N
7692.36 N
7924.25 N
7150.02 E
7357.34 E
7554.92 E
7758.81 E
7976.68 E
6000
6100
6200
6300
6400
.0 70.83 42.35 6040.8 11555.1
.0 69.04 42.97 6140.8 11833.8
.0 64.83 43.58 6240.8 12073.4
.0 59.70 45.07 6340.8 12263.8
.0 54.26 45.96 6440.8 12418.7
1.07 11556.9 45.1
.69 11839.0 45.1
1.84 12114.6 45.1
2.66 12290.2 45.0
3.69 12456.0 45.1
8151.26 N
8354.08 N
8529.11 N
8665.42 N
8773.79 N
8190.94 E
8382.29 E
8545.96 E
8678.97 E
8789.63 E
6500
6600
6700
6800
6900
.0 49.70 47.74 6540.8 12546.3
.0 45.19 48.38 6640.8 12655.2
.0 41.60 47.04 6740.8 12749.7
.0 38.04 46.63 6840.8 12832.5
.0 34.56 47.72 6940.8 12905.4
2.63 12572.1 45.1
3.45 12680.7 45.1
2.65 12781.5 45.1
2.36 12844.1 45.1
1.93 12930.8 45.1
8861.13 N
8933.81 N
8997.35 N
9054.22 N
9103.86 N
8882.75 E
8964.15 E
9034.31 E
9094.64 E
9148.17 E
7000.0 33.14 47.31 7040.8 12972.2
7100.0 31.90 47.24 7140.8 13036.1
7200.0 30.92 47.47 7240.8 13097.0
7300.0 30.04 46.89 7340.8 13155.8
7400.0 28.97 46.61 7440.8 13212.4
.97 12985.8 45.2
1.32 13039.5 45.2
.78 13117.1 45.2
.83 13167.5 45.2
.98 13216.6 45.2
9149.05 N
9192.49 N
9233.72 N
9273.88 N
9312.68 N
9197.47 E
9244.43 E
9289.28 E
9332.37 E
9373.65 E
A Gyroda t a D i re c t iona i Survey
B.P. EXPLORATION
F PAD, WELL NO. MPF-57
MILNE POINT FIELD, ALASKA
Job Number: SUB399
Page
SUBSEA I N C L AZIMUTH VERTICAL VERTICAL DOGLEG CLOSURE
DEPTH DEPTH SECTION SEVERITY DIST. AZIMUTH
feet deg. deg. feet feet deg./ feet deg.
100 ft.
HORIZONTAL
COORDINATES
feet
7577.3 26.68 45.39
Final Station Closure:
7618.1 13306.3 1.31
Distance: 13307.24 ft
13307.2 45.2
Az: 45.19 deg.
9377.77 N
9441.40 E
4. QUALITY CONTROL
QUALITY CONTROL REPORT
JOB NUMBER: A0597GCE399
TOOL NUMBER: 772
MAXIMUM GYRO TEMPERATURE:
MAXIMUM AMBIENT TEMPERATURE:
80.0 C
82.0 C
MAXIMUM INCLINATION: 74.47
AVERAGE AZIMUTH: 44.53
WIRELINE REZERO VALUE: N/A
REZERO ERROR / K: N/A
CALIBRATION USED FOR FIELD SURVEY: 1926
CALIBRATION USED FOR FINAL SURVEY: 1926
PRE JOB MASS BALANCE OFFSET CHECK: ..5
POST JOB MASS BALANCE OFFSET CHECK]:
USED O.O/N/A CONTINUOUS
CONDITION OF SHOCK WATCHES
.20
UPON ARRIVAL AT RIG: OFF
UPON COMPLETION OF SURVEY: OFF
UPON RETURN TO ATLAS OFF
BOTTOM LINE COMPARISIONS
M.D. INC AZIMUTH TVD NORTHING EASTING
MWD 16507 26.98 48.0 7579 9222 9603
FINAL SURVEY 16534 26.68 45.39 7618 9378 9441
FUNCTION TEST
JOB NUMBER' A0597GCE399
5 Survey stations were collected at the measured depth shown below. The tables show the repeatability
of the gyro tool in both inclination and azimuth at one measured depth.
INCLINATION
M.D. ft 1 2 3 4 5
1200 13.89 13.89 13.89 13.89 13.89
AZIMUTH
M.D. ft I 2 3 4 5
1200 77.84 77.90 77.93 78.02 78.08
5. EQUIPMENT AND CHRONOLOGICAL REPORT
EQUIPMENT REPORT
JOB NUMBER: A0597GCE399
DOWNHOLE ELECTRONICS
SURFACE ELECTRONICS
PRIMARY
TOOL No. 772
GYRO SECTION
DATA SECTION
POWER SECTION
A0162
C0100
C0040
COMPUTER A0349
POWER SUPPLY
PRINTER A0079
INTERFACE A0143
A0085
BACKUP
TOOL No. 758
GYRO SECTION
DATA SECTION
POWER SECTION
A0147
C0089
C0086
COMPUTER A0222
POWER SUPPLY
PRINTER A0029
INTERFACE A0055
A0107
WIRELINE COMPANY: SCHLUMBERGER
CABLE SIZE: 3/8"
RUNNING GEAR
SCHLUMBERGER 3 3/8" HOUSING W/ROLLERS TOP AND BOTTOM
TOTAL LENGTH OF TOOL :25'
MAXIMUM O.D.: 5.5 INCHES
TOTAL WEIGHT OF TOOL: 500 POUNDS
CHRONOLOGICAL REPORT
JOB NUMBER' A0597GCE399
SUNDAY,05/12/97
19:00
20:00
20:30
21:00
21:15
21:30
TO LOCATION
APGLIVE LOCATION
MU TOOL, STANDBY
[,D GR/CCL. WARM UP GYRO
PU GYRO.
START INRUN SURVEY
~;97
MONDAY,05/i" ~
01:00
04:30
05:00
06:00
16:00
17:00
18:00
SURVEY CONTINUOUS TO 16564'
OUTRUN CONTINUOUS
RIG DOWN
RTN TO ATLAS
PROCESS SURVEY/CHECK TOOL
RETURN TO MILNE POINT FIELD WITH RESULTS.
RETURN TO ATLAS.
TUESDAY,05/14/97
15:30 ALASKA AIR TO ANCHORAGE
,o o
Schlumberger ANADRILL Survey Report
Client: BP Exploration
Field: Milne Point
Well Name: MPF-57
Permanent datum GROUND LEVEL
Depth measured from
Elevation of kelly bushing
Elevation of drill floor
Elevation o~ ground level
Magnetic Declination 28.07 DEG
Grid Convergence 0.00 DEG
Total Correction 28.07 DEG
TIE IN POINT
Measured depth
True vertical depth
N/S disp (-ye for S)
E/W disp (-ye for W)
0.00 FT
0.00 FT
0.00 FT
0.00 FT
Survey_05.ASCII_FILE
21-MAR- 97 14:36:33
40.80 FT
40.80 FT
12.10 FT
Inclination 0.00 DEG
Azimuth 0.00 DEG
Azimuth from rotary table
to the target 44.53 DEG
Minimu~Curvature Method
MEASURED INTERVAL VERTICAL TARGET
DEPTH DEPTH SECTION
FT FT FT FT
0.0 0.00 0.00 0.00
112.0 112.00 112.00 0.00
204.5 92.50 204.50 -0.33
295.0 90.50 295.00 -0.62
385.4 90.40 385.40 -0.00
477.3 91.90 477.27 1.85
567.4 90.10 567.31 5.18
656.9 89.50 656.64 10.28
750.5 93.60 749.91 17.57
840.7 90.20 839.62 26.09
928.4 87.70 926.56 36.18
1019.2 90.80 1015.99 50.33
1114.6 95.40 1109.19 68.40
1211.3 96.70 1203.08 87.98
1306.5 95.20 1294.95 108.78
1401.3 94.80 1385.36 132.82
1497.0 95.70 1475.03 162.02
1589.7 92.70 1561.05 192.78
1684.9 95.20 1648.84 225.61
1779.5 94.60 1734.79 261.30
Page 001
1874.6 95.10 1819.98 300.24
1971.1 96.50 1905.04 342.96
2065.8 94.70 1986.40 388.78
2161.8 96.00 2066.23 439.63
2258.4 96.60 2143.65 495.28
2352.5 94.10 2217.22 551.94
2447.9 95.40 2290.07 611.79
2543.2 95.30 2360.16 675.03
2637.8 94.60 2427.13 740.70
2733.2 95.40 2491.71 809.95
2828.5 95.30 2552.99 882.03
STATION
INCLN.
DEG
0.00
0.00
0.44
0.06
0.79
AZIMUTH LATITUDE DEPARTURE DISPLA- at AZIMUTH DLS
N/-S E/-W CEMENT
DEG FT FT FT DEG D/HF
0.0 0.00 0.00 0.00 0.00 0.00
0.0 0.00 0.00 0.00 0.00 0.00
204.4 -0.32 -0.15 0.36 204.40 0.48
64.7 -0.62 -0.25 0.67 201.77 0.54
68.3 -0.37 0.37 0.53 134.58 0.81
1.64
2.77
4.18
5.43
6.51
59.2 0.54 2.09 2.16 75.57 0.95
61.5 2.24 5.11 5.58 66.37 1.26
66.3 4.58 10.00 11.00 65.39 1.61
65.9 7.76 17.17 18.84 65.68 1.34
72.0 11.09 25.92 28.20 66.84 1.38
8.55
11.35
13.33
14.33
16.05
73.9 14.44 36.91 39.64 68.63 2.34
67.0 19.81 51.63 55.30 69.01 3.35
75.8 26.18 70.93 75.61 69.75 2.86
77.4 31.52 93.42 98.59 71.36 1.11
78.6 36.69 117.82 123.40 72.70 1.84
18.94 75.6 43.11 145.57 151.82 73.50 3.19
21.92 71.7 52.58 177.59 185.21 73.51 3.42
21.87 71.7 63.44 210.41 219.76 73.22 0.05
23.61 71.1 75.18 245.28 256.54 72.96 1.84
25.77 68.8 88.76 282.38 296.00 72.55 2.50
27.02 66.1 104.99 321.41 338.12 71.91 1.82
29.33 63.7 124.34 362.64 383.37 71.07 2.67
32.21 63.2 146.00 405.97 431.43 70.22 3.05
35.27 60.9 171.02 453.04 484.25 69.32 3.45
38.17 59.2 199.88 503.06 541.32 68.33 3.18
38.97
41.48
43.81
46.06
48.72
51.24
59.9 229.61 553.64 599.36 67.47 0.97
56.5 262.10 605.95 660.21 66.61 3.49
55.8 298.07 659.56 723.79 65.68 2.50
54.4 336.30 714.35 789.55 64.79 2.60
53.6 377.58 771.14 858.61 63.91 2.86
53.5 420.94 829.84 930.49 63.10 2.65
Page 1
ORIGINAL
[]
Schlumberger ANADRILL Survey Report
MEASURED INTERVAL VERTICAL
DEPTH DEPTH
FT FT FT
2924.5 96.00 2611.26
3019.1 94.60 2665.50
3114.1 95.00 2716.84
3210.8 96.70 2765.17
3306.2 95.40 2808.96
3400.8 94.60 2848.90
3495.6 94.80 2886.32
3591.6 96.00 2921.32
3688.2 .96.60 2952.00
3782.3 94.10 2978.18
Survey_05.ASCII_FILE
21-MAR- 97 14:36:33
Page 002
Minimum Curvature Method
TARGET
SECTION
FT
957.56
1034.58
1114.18
1197.74
1282.36
STATION AZIMUTH LATITUDE DEPARTURE DISPLA- at AZIMUTH DLS
INCLN. N/-S E/-W CEMENT
DEG DEG FT FT FT DEG D/HF
54.01 51.6 467.34 890.38 1005.57 62.31 3.29
56.01 50.2 516.22 950.51 1081.64 61.49 2.44
58.56 49.2 567.92 1011.46 1159.99 60.69 2.83
61.47 47.4 623.64 1073.97 1241.91 59.86 3.41
63.88 47.9 680.73 1136.60 1324.86 59.08 2.57
1368.02
1455.07
1544.42
1636.00
1726.36
66.17 46.2 739.16 1199.36 1408.83 58.35 2.92
-67.33 46.8 799.12 1262.54 1494.18 57.67 1.35
69.91 45.6 860.99 1327.05 1581.88 57.02 2.93
73.05 44.9 925.47 1392.08 1671.64 56.38 3.32
74.64 42.4 990.87 1454.46 1759.90 55.73 3.06
3878.1 95.80 3003.66
3973.6 95.50 3029.12
4066.9 93.30 3053.80
4161.7 94.80 3078.27
4257.4 95.70 3102.97
4352.5 95.10
4447.3 94.80
4542.9 95.60
4636.5 93.60
4729.8 93.30
4824.7 94.90
4918.7 94.00
5012.2 93.50
5107.4 95.20
5199.4 92.00
1818.64
1910.64
2000.60
2092.15
2184.59
3128.20 2276.28
3154.40 2367.38
3181.98 2458.91
3209.39 2548.39
3236.42 2637.67
3263.83 2728.53
3291.09 2818.49
3317.66 2908.13
3345.22 2999.25
3372.76 3087.01
5291.6 92.20 3400.37 3174.94
5385.5 93.90 3428.46 3264.53
5482.1 96.60 3457.18 3356.75
5574.9 92.80 3484.45 3445.45
5670.4 95.50 3512.40 3536.75
5764.3 93.90 3539.64 3626.57
5858.5 94.20 3567.22 3716.62
5952.5 94.00 3595.55 3806.25
5976.2 23.70 3602.77 3828.82
6071.4 95.20 3631.91 3919.45
6167.0 95.60 3660.76 4010.58
6262.8 95.80 3688.84 4102.16
6358.6 95.80 3716.44 4193.89
6453.3 94.70 3743.21 4284.72
6546.3 93.00 3769.74 4373.85
6642.2 95.90 3797.86 4465.54
6736.9 94.70 3825.53 4556.10
6831.4 94.50 3853.62 4646.33
6927.1 95.70 3882.63 4737.52
7020.9 93.80 3910.94 4826.95
74.51 42.3 1059.12 1516.67 1849.87 55.07 0.17
74.57 43.3 1126.65 1579.21 1939.91 54.49 1.01
74.76 43.1 1192.24 1640.80 2028.22 54.00 0.29
75.32 42.8 1259.28 1703.21 2118.18 53.52 0.67
,
74.76 44.2 1326.34 1766.85 2209.28 53.11 1.53
74.48 43.9 1392.25 1830.60 2299.88 52.75 0.42
73.43 44.7 1457.45 1894.23 2390.03 52.42 1.37
73.03 45.4 1522.12 1959.01 2480.84 52.15 0.82
72.92 46.0 1584.62 2023.06 2569.79 51.93 0.62
73.39 44.7 1647.38 2086.58 2658.51 51.71 1.43
73.04 45.2 1711.68 2150.77 2748.76 51.49 0.62
73.25 44.7 1775.35 2214.33 2838.15 51.28 0.56
73.73 43.9 1839.51 2276.94 2927.15 51.07 0.97
72.61 45.6 1904.22 2341.08 3017.73 50.88 2.07
72.56 46.0 1965.42 2404.01 3105.18 50.73 0.42
72.59 46.3 2026.36 2467.45 3192.88 50.61 0.31
72.60 44.8 2089.11 2531.41 3282.14 50.47 1.52
72.80 45.3 2154.26 2596.69 3373.97 50.32 0.54
73.02 44.8 2216.93 2659.46 3462.30 50.19 0.57
72.95 46.2 2280.94 2724.60 3553.32 50.07 1.40
73.32 46.5 2342.96 2789.62 3643.00 49.97 0.50
72.63 45.1 2405.75 2854.19 3732.83 49.87 1.60
72.30 44.0 2469.63 2917.07 3822.09 49.75 1.17
72.20 4'4.7 2485.77 2932.85 3844.56 49.72 2.84
72.16 44.7 2550.19 2996.60 3934.85 49.60 0.04
72.71 45.7 2614.41 3061.27 4025.73 49.50 1.15
73.20 45.4 2678.55 3126.65 4117.11 49.41 0.59
73.31 45.1 2743.14 3191.80 4208.61 49.32 0.32
73.85 45.2 2807.20 3256.20 4299.21 49.24 0.58
73.00 44.9 2870.17 3319.29 4388.11 49.15 0.96
72.90 45.0 2935.06 3384.06 4479.56 49.06 0.14
73.12 45.1 2999.04 3448.16 4569.91 48.98 0.25
72.30 44.6 3063.01 3511.79 4659.90 48.90 1.00
72.40 44.6 3127.94 3575.82 4750.85 48.82 0.10
72.47 45.1 3191.34 3638.89 4840.06 48.75 0.51
Page 2
Schlumberger ANADRILL Survey Report
Survey_05.ASCII_FILE
21-MAR-97 14:36:33
Page 003
MEASURED INTERVAL VERTICAL
DEPTH DEPTH
FT FT FT
7114.7 93.80 3939.28
7209.5 94.80 3967.84
7303.7 94.20 3995.73
7397.0 93.30 4023.54
7492.1 95.10 4052.80
Minimum Curvature Method
TARGET STATION AZIMUTH LATITUDE DEPARTURE DISPLA- at AZIMUTH DLS
SECTION INCLN. N/-S E/-W CEMENT
FT DEG DEG FT FT FT DEG D/HF
4916.36 72.36 44.5 3254.79 3701.90 4929.27 48.68 0.62
5006.76 72.57 44.9 3319.04 3765.48 5019.45 48.61 0.46
5096.73 72.99 45.1 3382.67 3829.10 5109.25 48.54 0.49
5185.79 72.33 44.1 3446.08 3891.64 5198.10 48.47 1.24
5276.27 71.82 44.4 3510.89 3954.78 5288.35 48.40 0.61
7584.0 91.90 4081.22
7676.3 92.30 4110.08
7771.2 94.90 4139.18
7866.7 95.50 4167.21
7961.3 94.60 4195.10
5363.66 72.16 43.4 3573.86 4015.38 5375.48 48.33 1.10
5451.32 71.40 43.5 3637.51 4075.67 5462.84 48.25 0.83
5541.62 72.88 42.8 3703.41 4137.44 5552.81 48.17 1.71
5632.88 72.99 43.2 3770.18 4199.70 5643.74 48.08 0.42
5723.25 72.72 43.2 3836.07 4261.58 5733.81 48.01 0.29
8056.3 95.00 4223.65
8148.4 92.10 4251.32
8243.8 95.40 4280.05
8335.7 91.90 4307.04
8432.8 97.10 4334.77
5813.82 72.30 42.6 3902.45 4323.26 5824.06 47.93 0.75
5901.62 72.73 42.9 3966.95 4382.89 5911.55 47.85 0.56
5992.56 72.22 43.2 4033.43 4444.99 6002.21 47.78 0.61
6080.37 73.61 42.5 4097.83 4504.73 6089.73 47.71 1.68
6173.38 73.21 43.0 4166.17 4567.90 6182.45 47.63 0.64
8526.0 93.20 4361.12
8620.8 94.80 4388.01
8715.6 94.80 4415.24
8808.7 93.10 4442.13
8903.6 94.90 4470.17
6262.74 73.94 42.8 4231.65 4628.75 6271.54 47.57 0.81
6353.60 73.10 42.6 4298.46 4690.40 6362.12 47.50 0.91
6444.35 73.52 42.5 4365.36 4751.80 6452.60 47.43 0.45
6533.41 72.91 41.9 4431.39 4811.68 6541.36 47.36 0.90
6624.02 72.71 43.5 4498.01 4873.16 6631.72 47.29 1.62
8997.2 93.60 4498.71
9091.6 94.40 4528.07
9184.8 93.20 4556.34
9278.5 93.70 4583.59
9371.8 93.30 4610.53
6713.14 71.79 42.8 4563.05 4934.12 6720.64 47.24 1.21
6802.83 71.97 44.0 4628.23 4995.77 6810.16 47.19 1.22
6891.64 72.72 44.6 4691.79 5057.79 6898.85 47.15 1.01
6981.29 73.46 45.2 4755.29 5121.07 6988.43 47.12 1.00
7070.61 72.98 44.6 4818.56 5184.13 7077.69 47.09 0.80
9401.1 29.30 4619.17
9554.4 153.30 4665.42
9652.8 98.40 4695.22
9747.6 94.80 4723.20
9842.0 94.40 4750.67
7098.61 72.72 44.2 4838.57 5203.71 7105.66 47.08 1.58
7244.76 72.16 44.8 4942.81 5306.16 7251.67 47.03 0.52
7338.54 72.58 43.2 5010.27 5371.30 7345.31 46.99 1.61
7429.05 73.09 41.6 5077.16 5432.37 7435.60 46.94 1.70
7519.27 73.07 42.4 5144.27 5492.80 7525.58 46.88 0.81
9934.5 92.50 4777.13
10029.4 94.90 4804.16
10125.1 95.70 4831.39
10221.2 96.10 4858.35
10317.0 95.80 4885.43
7607.86 73.69 43.0 5209.41 5552.91 7613.98 46.83 0.91
7698.78 73.21 42.5 5276.21 5614.66 7704.72 46.78 0.71
7790.52 73.74 45.3 5342.31 5678.27 7796.35 46.75 2.86
7882.75 73.67 44.9 5407.42 5743.61 7888.55 46.73 0.41
7974.64 73.50 44.2 5472.91 5808.07 7980.38 46.70 0.72
10413.2 96.20 4912.80
10507.1 93.90 4939.51
10601.2 94.10 4966.38
10696.5 95.30 4993.88
10791.1 94.60 5021.96
8066.87 73.43 44.7 5538.74 5872.66 8072.53 46.68 0.50
8156.88 73.53 46.0 5602.00 5936.70 8162.53 46.66 1.33
8247.04 73.28 45.0 5665.21 6001.02 8252.69 46.65 1.05
8338.27 73.18 46.2 5729.05 6066.21 8343.92 46.64 1.21
8428.57 72.28 46.0 5791.69 6131.30 8434.25 46.63 0.97
10886.1 95.00 5051.23
10980.1 94.00 5080.40
11076.9 96.80 5110.08
11170.9 94.00 5138.47
11264.8 93.90 5166.24
8518.94 71.83 44.9 5855.09 6195.71 8524.60 46.62 1.20
8608.30 72.02 44.6 5918.55 6258.62 8613.92 46.60 0.36
8700.43 72.27 43.7 5984.66 6322.80 8705.97 46.57 0.92
8790.03 72.57 43.5 6049.56 6384.59 8795.46 46.54 0.38
8879.73 73.03 44.3 6114.19 6446.79 8885.07 46.52 0.95
Page 3
Schlumberger ANADRILL Survey Report
Survey_05.ASCII_FILE
21-MAR-97 14:36:33
Page 004
Minimum Curvature Method
MEASURED INTERVAL VERTICAL TARGET STATION AZIMUTH LATITUDE DEPARTURE DISPLA- at AZIMUTH DLS
DEPTH DEPTH SECTION INCLN. N/-S E/-W CEMENT
FT FT FT FT DEG DEG FT FT FT DEG D/HF
11358.4 93.60 5193.68 8969.21 72.88 45.2 6177.74 6509.79 8974.51 46.50 0.93
11453.6 95.20 5221.52 9060.24 73.11 45.5 6241.72 6574.56 9065.53 46.49 0.39
11546.4 92.80 5248.94 9148.89 72.52 45.3 6303.97 6637.68 9154.17 46.48 0.67
11641.3 94.90 5277.79 9239.29 72.08 43.5 6368.56 6700.93 9244.52 46.46 1.87
11733.3 92.00 5306.0.9 9326.82 72.09 44.4 6431.58 6761.69 9331.97 46.43 0.93
11825.8 92.50 5333.59 9415.14 73.32
11920.3 94.50 5359.83 9505.92 74.44
12015.1 94.80 5385.77 9597.10 73.80
12110.1 95.00 5412.81 9688.16 73.12
12204.0 93.90 5440.37 9777.92 72.75
44.9 6494.41 6823.76 9420.25 46.42 1.43
43.8 6559.33 6887.21 9510.97 46.40 1.63
44.2 6624.92 6950.55 9602.07 46.37 0.79
44.0 6690.32 7013.93 9693.07 46.35 0.74
43.7 6755.05 7076.12 9782.75 46.33 0.50
12299.0 95.00 5468.42 9868.66 72.90
12393.2 94.20 5496.52 9958.57 72.39
12486.3 93.10 5524.73 10047.29 72.34
12580.7 94.40 5553.70 10137.13 71.91
12674.7 94.00 5582.99 10226.44 71.78
42.9 6821.11 7138.36 9873.39 46.30 0.82
45.0 6885.84 7200.76 9963.22 46.28 2.20
44.0 6949.12 7262.95 10051.90 46.26 1.03
43.8 7013.85 7325.24 10141.66 46.24 0.50
44.2 7078.11 7387.29 10230.92 46.22 0.43
12769.4 94.70 5613.02 10316.25 71.25
12863.2 93.80 5643.07 10405.09 71.38
12957.0, 93.80 5673.64 10493.77 70.58
13052.8 95.80 5705.59 10584.07 70.46
13145.2 92.40 5736.64 10671.07 70.26
43.4 7142.93 7449.45 10320.65 46.20 0.98
44.0 7207.17 7510.84 10409.42 46.18 0.62
44.5 7270.69 7572.72 10498.05 46.17 0.99
46.2 7334.16 7636.97 10588.35 46.16 1.68
45.9 7394.56 7699.62 10675.38 46.16 0.37
13240.8 95.60 5768.05 10761.35 71.39
13334.9 94.1D 5798.23 10850.47 71.19
13427.5 92.60 5827.40 10938.35 72.09
13521.0 93.50 5856.18 11027.31 72.05
13615.5 94.50 5884.58 11117.44 72.98
43.9 7458.51 7763.35 10765.64 46.15 2.30
43.7 7522.84 7825.04 10854.70 46.13 0.29
43.7 7586.38 7885.76 10942.50 46.11 0.97
44.8 7650.10 7947.83 11031.41 46.09 1.12
44,6 7714.17 8011.23 11121.52 46.08 1.00
13707.5 92.00 5911.74 11205.33 72.67
13802.5 95.00 5939.69 11296.12 73.12
13898.3 95.80 5967.95 11387.64 72.56
13990.8 92.50 5996.36 11475.67 71.67
14084.8 94.00 6026.52 11564.69 70.90
45.4 7776.32 8073.38 11209.40 46.07 0.90
45.6 7839.96 8138.14 11300.19 46.07 0.51
45.2 7904.23 8203.32 11391.72 46.06 0.71
43.9 7966.96 8265.08 11479.72 46.05 1.65
44.1 8031.00 8326.92 11568.69 46.04 0.84
14178.2 93.40 6056.92 11653.00 71.11
14272.0 93.80 6088.10 11741.45 70.06
14365.4 93.40 6120.59 11829.02 69.23
14457.6 92.20 6153.95 11914.96 68.34
14551.1 93.50 6189.33 12001.51 67.20
45.7 8093.56 8389.26 11656.99 46.03 1.64
45.4 8155.51 8452.41 11745.45 46.02 1.16
43.8 8217.85 8513.89 11832.98 46.01 1.84
44.3 8279.63 8573.65 11918.88 46.00 1.09
44.7 8341.36 8634.32 12005.40 45.99 1.28
14642.8 91.70 6226.51 12085.33 64.96
14734.4 91.60 6266.60 12167.66 63.12
14830.0 95.60 6311.80 12251.85 60.44
14923.5 93.50 6359.63 12332.14 58.03
15017.8 94.30 6411.40 12410.90 55.36
45.3 8400.63 8693.58 12089.21 45.98 2.51
46.2 8458.10 8752.57 12171.56 45.98 2.19
46.5 8516.24 8813.51 12255.79 45.98 2.82
46.2 8571.69 8871.64 12336.12 45.99 2.59
46.7 8625.99 8928.75 12414.92 45.99 2.87
15108.9 91.10 6465.06 12484.42 52.47
15203.7 94.80 6524.53 12557.99 49.81
15294.9 91.20 6584.98 12625.96 47.15
15388.5 93.60 6650.27 12692.77 44.38
15481.8 93.30 6718.34 12756.43 41.91
48.3 8675.73 8983.01 12488.51 46.00 3.48
49.9 8724.07 9038.79 12562.21 46.02 3.10
50.0 8768.01 9091.05 12630.33 46.04 2.92
49.0 8811.55 9142.05 12697.26 46.05 3.06
47.2 8854.13 9189.55 12761.01 46.06 2.96
Page 4
Schlumberger ANADRILL Survey Report
Survey_05.ASCII_FILE
21-MAR-97 14:36:33
Page 005
Minimum Curvature Method
MEASURED INTERVAL VERTICAL TARGET STATION AZIMUTH LATITUDE DEPARTURE DISPLA- at AZIMUTH DLS
DEPTH DEPTH SECTION INCLN. N/-S E/-W CEMENT
FT FT FT FT DEG DEG FT FT FT DEG D/HF
15574.6 92.80 6788.80 12816.74 39.28 47.4 8895.08 9233.92 12821.38 46.07 2.84
15666.9 92.30 6861.44 12873.60 36.91 47.8 8933.48 9275.96 12878.30 46.08 2.58
15761.7 94.80 6938.46 12928.76 34.41 48.5 8970.36 9317.12 12933.53 46.09 2.67
15854.4 '92.70 7015.47 12980.18 33.24 49.9 9004.08 9356.17 12985.05 46.10 1.52
15947.0 92.60 7093.25 13030.26 32.48 48.3 9036.97 9394.15 13035.22 46.11 1.25
16040.7 93.70 7172.76 13079.71 31.40 48.8 9069.79 9431.30 13084.74 46.12 1.19
16134.4 93.70 7252.98 13127.98 30.84 49.3 9101.53 9467.88 13133.11 46.13 0.66
16226.7 92.30 7332.58 13174.60 29.99 47.6 9132.51 9502.85 13179.79 46.14 1.31
16321.1 94.40 7414.77 13220.94 28.93 48.2 9163.64 9537.30 13226.20 46.14 1.17
16414.0 92.90 7496.33 13265.34 28.28 47.8 9193.40 9570.35 13270.65 46.15 0.73
16507.5 93.50 7579.17 13308.63
16603.5 96.00 7665.11 13351.35
16655.3 51.80 7711.80 13373.76
The last survey is projected
16750.0 94.70 7797.35 13414.33
26.98 48.0 9222.47 9602.52 13313.99 46.16 1.39
25.94 46.7 9251.44 9633.99 13356.75 46.16 1.24
25.39 47.0 9266.78 9650.35 13379.19 46.16 1.09
25.39 47.0 9294.48 9680.05 13419.79 46.16 0.00
Page 5
BP EXPLORATION
MILNE POINT / MPF-57
500292274700
NORTH SLOPE BOROUGH
COMPUTATION DATE: 4/
?~'~RRY-SUN DRILLING SERVICES
ANCHORAGE ALASKA
PAGE
3/97
DATE OF SURVEY: 032197
MAGNETIC MULTI-SHOT SURVEY
JOB NUMBER: AK-EI-70074
KELLY BUSHING ELEV. = 41.60 FT.
OPERATOR: BP EXPLORATION
TRUE SUB-SEA
MEASD VERTICAL VERTICAL
DEPTH DEPTH DEPTH
COURS
INCLN
DG MN
COURSE DLS TOTAL
DIRECTION RECTANGULAR COORDINATES
DEGREES DG/100 NORTH/SOUTH EAST/WEST
VERT.
SECT.
9652.77 4695.36 4653.76
9690.30 4706.54 4664.94
9785.95 4733.99 4692.39
9881.60 4760.74 4719.14
9977.03 4787.25 4745.65
72 34 N 43.16 E .00 5010.16N 5371.01E
73 26 N 14.32 E 73.46 5041.25N 5388.04E
73 11 N 14.41 E .28 5130.02N 5410.76E
74 18 N 15.45 E 1.56 5218.74N 5434.42E
73 25 N 14.78 E 1.14 5307.24N 5458.32E
7338.26
7372.36
7451.58
7531.42
7611.27
10071.93 4814.06 4772.46
10167.48 4840.28 4798.68
10262.98 4866.31 4824.71
10358.55 4893.07 4851.47
10453.74 4919.79 4878.19
73 45 N 15.69 E .97 5395.07N 5482.24E
74 24 N 16.91 E 1.41 5483.25N 5508.03E
73 58 N 17.50 E .75 5571.03N 5535.20E
73 30 N 16.40 E 1.21 5658.78N 5561.95E
73 52 N 17.65 E 1.32 5746.13N 5588.71E
7690.66
7771.60
7853.23
7934.55
8015.59
10548.29 4946.56 4904.96
10642.82 4973.37 4931.77
10738.35 5000.65 4959.05
10832.99 5028.91 4987.31
10927.94 5058.11 5016.51
73 13 N 16.97 E .97 5832.70N 5615.69E
73 48 N 17.77 E 1.02 5919.21N 5642.76E
73 0 N 17.45 E .90 6006.47N 5670.45E
72 14 N 16.91 E .98 6092.76N 5697.13E
71 56 N -16.38 E .62 6179.32N 5723.01E
8096.22
8176.87
8258.50
8338.73
8418.59
11023.03 5086.84 5045.24
11118.58 5115.50 5073.90
11212.72 5143.32 5101.72
11306.43 5170.51 5128.91
11400.75 5197.77 5156.17
72 53 N 15.75 E 1.18 6266.43N 5748.09E
72 11 N 15.65 E .74 6354.17N 5772.75E
73 26 N 16.12 E 1.41 6440.67N 5797.36E
72 49 N 15.79 E .74 6526.89N 5~22.01E
73 34 N 17.04 E 1.50 6613.50N 5847.52E
8498.27
8578.11
8657.04
8735.79
8815.42
11494.93 5224.81 5183.21
11588.57 5252.60 5211.00
11683'.26 5281.52 5239.92
11775.43 5309.09 5267.49
11867.93 5334.78 5293.18
73 3 N 16.71 E .65 6699.83N 5873.71E
72 25 N 16.31 E .78 6785.56N 5899.12E
72 0 N 16.11 E .49 6872.14N 5924.29E
73 11 N 15.75 E 1.35 6956.71N 5948.43E
74 33 N 16.06 E 1.50 7042.16N 5972.78E
8895.33
8974.27
9053.64
9130.86
9208.84
11961.83 5360.04 5318.44
12057.63 5386.56 5344.96
12152.53 5413.77 5372.17
12246.63 5440.93 5399.33
12340.26 5468.21 5426.61
74 14 N 15.82 E .41 7129.12N 5997.61E
73 37 N 14.93 E 1.11 7217.88N 6022.03E
73 3 N 15.40 E .76 7305.62N 6045.81E
73 24 N 16.03 E .75 7392.35N 6070.21E
72 41 N 15.95 E .76 7478.45N 6094.88E
9288.25
9368.65
9447.88
9526.82
9605.50
12435.26 5496.48 5454.88
12528.38 5524.79 5483.19
12623.03 5553.77 5512.17
12716.39 5582.71 5541.11
12810.99 5612.35 5570.75
72 40 N 16.82 E .87 7565.46N
71 55 N 16.03 E 1.15 7650.55N
72 25 N 17.23 E 1.32 7736.88N
71 27 N 15.83 E 1.76 7821.96N
72 1 N 17.12 E 1.42 7908.10N
6120.47E 9685.47
6145.56E 9763.72
6171.35E 9843.35
6196.60E 9921.71
6222.08E 10000.99
~-~ERRY-SUN DRILLING SERVICES
ANCHORAGE ALASKA
PAGE
BP EXPLORATION
MILNE POINT / MPF-57
500292274700
NORTH SLOPE BOROUGH
COMPUTATION DATE: 4/ 3/97
DATE OF SURVEY: 032197
MAGNETIC MULTI-SHOT SURVEY
JOB NUMBER: AK-EI-70074
KELLY BUSHING ELEV. = 41.60
OPERATOR: BP EXPLORATION
FT.
TRUE SUB-SEA
MEASD VERTICAL VERTICAL
DEPTH DEPTH DEPTH
COURS
INCLN
DG MN
COURSE DLS TOTAL
DIRECTION RECTANGULAR COORDINATES
DEGREES DG/100 NORTH/SOUTH EAST/WEST
VERT.
SECT.
12905.64 5642.31 5600.71
12998.93 5672.89 5631.29
13094.56 5704.97 5663.37
13186.86 5734.96 5693.36
13281.96 5765.25 5723.65
71 4
70 40
70 7
71 56
70 54
N 17.04 E 1.01 7993.92N 6248.45E
N 18.64 E 1.68 8077.81N 6275.45E
N 16.41 E 2.27 8163.70N 6302.58E
N 17.03 E 2.06 8247.28N 6327.69E
N 16.37 E 1.27 8333.62N 6353.60E
10080.66
10159.40
10239.65
10316.85
10396.57
13375.52 5794.51 5752.91
13469.47 5823.17 5781.57
13563.09 5851.02 5809.42
13657.16 5878.51 5836.91
13751.80 5906.13 5864.53
72 38
71 50
73 32
72 28
73 34
N 16.84 E 1.91 8418.77N 6378.99E
N 16.63 E .88 8504.45N 6404.75E
N 16.82 E 1.83 8590.04N 6430.47E
N 16.72 E 1.13 8676.18N 6456.42E
N 18.17 E 1.87 8762.52N 6483.55E
10475.08
10554.22
10633.27
10712.88
10793.46
13846.17 5933.19 5891.59
13940.02 5961.11 5919.51
14033.54 5990.20 5948.60
14127.10 6020.21 5978.61
14220.77 6050.83 6009.23
73 5
72 17
71 28
71 6
70 43
N 17.69 E .71 8848.54N 6511.39E
N 16.93 E 1.15 8934.07N 6538.05E
N 16.34 E 1.06 9019.23N 6563.50E
N 17.08 E .84 9104.10N 6588.98E
N 17.29 E .46 9188.67N 6615.14E
10874.30
10953.97
11032.52
11110.90
11189.53
14313.98 6082.38 6040.78
14407.15 6115.27 6073.67
14499.46 6149.05 6107.45
14592.93 6185.60 6144.00
14684.30 6224.46 6182.86
69 41
68 57
68 5
65 50
63 47
N 16.95 E 1.16 9272.49N 6640.96E
N 16.42 E .96 9355.99N 6665.99E
N 16.56 E .94 9438.36N 6690.37E
N 16.86 E 2.42 9520.73N 6715.09E
N 17.82 E 2.44 9599.65N 6739.72E
11267.39
11344.47
11420.28
11496.35
11569.88
14777.32 6267.00 6225.40
14872.20 6313.69 6272.09
14966.48 6363.71 6322.11
15059.97 6417.16 6375.56
15152.14 6473.56 6431.96
61 46
59 15
56 40
53 34
50 57
N 18.32 E 2.23 9678.28N 6765.37E
N 18.78 E 2.69 9756.56N 6791.63E
N 19.02 E 2.75 9832.17N 6817.51E
N 19.30 E 3.31 9904.61N 6842.67E
N 20.05 E 2.91 9973.25N 6867.20E
11643.92
11718.14
11790.19
11859.48
11925.61
15245.63 6534.07 6492.47
15337.63 6596.94 6555.34
15431.07 6663.90 6622.30
15524.25 6733.42 6691.82
15617.21 6805.40 6763.80
48 21
45 24
43 1
40 27
38 1
N 21.36 E 2.98 10039.91N 6892.38E
N 21.05 E 3.22 10102.51N 6916.67E
N 20.38 E 2.61 10163.44N 6939.72E
N 19.61 E 2.80 10221.73N 6960.93E
N 19.75 E 2.61 10277.09N 6980.73E
11990.79
12052.45
12112.05
12168.48
12221.83
15710.77 6880.56 6838.96
15803.36 6956.90 6915.30
15896.57 7034.68 6993.08
15990.45 7113.94 7072.34
16084.25 7194.00 7152.40
35 2
33 53
33 0
31 47
30 59
N 20.81 E 3.27 10329.34N 7000.02E
N 20.99 E 1.25 10378.28N 7018.71E
N 20.58 E .98 10426.30N 7036.94E
N 20.31 E 1.30 10473.44N 7054.51E
N 19.95 E .88 10519.31N 7071.32E
12272.60
12320.60
12367.62
12413.54
12458.04
~-ERRY-SUN DRILLING SERVICES
ANCHOR_AGE ALASKA
PAGE
BP EXPLORATION
MILNE POINT / MPF-57
500292274700
NORTH SLOPE BOROUGH
COMPUTATION DATE: 4/
3/97
DATE OF SURVEY: 032197
MAGNETIC MULTI-SHOT SURVEY
JOB NUMBER: AK-EI-70074
KELLY BUSHING ELEV. = 41.60 FT.
OPERATOR: BP EXPLORATION
TRUE SUB-SEA COURS COURSE DLS TOTAL
MEASD VERTICAL VERTICAL INCLN DIRECTION RECTANGULAR COORDINATES VERT.
DEPTH DEPTH DEPTH DG MN DEGREES DG/100 NORTH/SOUTH EAST/WEST SECT.
16177.61 7274.29 7232.69 30 22 N 19.53 E .69 10564.16N 7087.41E 12501.29
16270.76 7354.99 7313.39 29 32 N 19.01 E .95 10608.07N 7102.77E 12543.36
16364.44 7436.85 7395.25 28 38 N 20.18 E 1.13 10650.97N 7118.03E 12584.65
16414.00 7480.46 7438.86 28 5 N 20.45 E 1.15 10673.05N 7126.21E 12606.12
16457.00 7518.53 7476.93 27 19 N 20.65 E 1.79 10691.77N 7133.22E 12624.39
16519.00 7573.78 7532.18 26 39 N 20.58 E 1.08 10718.10N 7143.13E 12650.11
16604.00 7650.05 7608.45 25 43 N 20.84 E 1.09 10753.20N 7156.39E 12684.43
THE CALCULATION PROCEDURES ARE BASED ON THE USE OF
THREE-DIMENSION MINIMUM CURVATURE METHOD.
HORIZONTAL DISPLACEMENT = 12916.86 FEET
AT NORTH 33 DEG. 38 MIN. EAST AT MD = 16604
VERTICAL SECTION RELATIVE TO WELL HEAD
VERTICAL SECTION COMPUTED ALONG 44.53 DEG.
TIE-IN SURVEY AT 9,652.77' MD
LAST SURVEY STATION AT 16,604.00' MD
?--'~RRY-SUN DRILLING SERVICES
ANCHORAGE ALASKA
PAGE
BP EXPLORATION
MILNE POINT / MPF-57
500292274700
NORTH SLOPE BOROUGH
COMPUTATION DATE: 4/ 3/97
DATE OF SURVEY: 032197
JOB NUMBER: AK-EI-70074
KELLY BUSHING ELEV. = 41.60
OPERATOR: BP EXPLORATION
FT.
INTERPOLATED VALUES FOR EVEN 1000 FEET OF MEASURED DEPTH
TRUE SUB-SEA TOTAL
MEASD VERTICAL VERTICAL RECTANGULAR COORDINATES MD-TVD
DEPTH DEPTH DEPTH NORTH/SOUTH EAST/WEST DIFFERENCE
VERTICAL
CORRECTION
9652.77 4695.36 4653.76 5010.16 N 5371.01 E 4957.41
10652.77 4976.15 4934.55 5928.31 N 5645.67 E 5676.62
11652.77 5272.10 5230.50 6844.28 N 5916.25 E 6380.67
12652.77 5562.75 5521.15 7763.95 N 6179.74 E 7090.02
13652.77 5877.18 5835.58 8672.17 N 6455.21 E 7775.59
719.21
704.05
709.34
685.57
14652.77 6210.54 6168.94 9572.72 N 6731.07 E 8442.23
15652.77 6833.62 6792.02 10297.42 N 6988.11 E 8819.15
16604.00 7650.05 7608.45 10753.20 N 7156.39 E 8953.95
666.64
376.92
134.80
THE CALCULATION PROCEDURES ARE BASED ON THE USE OF
THREE-DIMENSION MINIMUM CURVATURE METHOD.
~ RRY-SUN DRILLING SERVICES
ANCHORAGE ALASKA
PAGE
BP EXPLORATION
MILNE POINT / MPF-57
500292274700
NORTH SLOPE BOROUGH
COMPUTATION DATE: 4/
3/97
DATE OF SURVEY: 032197
JOB NUMBER: AK-EI-70074
KELLY BUSHING ELEV. = 41.60
OPERATOR: BP EXPLORATION
FT.
INTERPOLATED VALUES FOR EVEN 100 FEET OF SUB-SEA DEPTH
TRUE SUB-SEA
MEASD VERTICAL VERTICAL
DEPTH DEPTH DEPTH
TOTAL
RECTANGULAR COORDINATES
NORTH/SOUTH EAST/WEST
MD-TVD VERTICAL
DIFFERENCE CORRECTION
9652.77 4695.36 4653.76 5010.16 N 5371.01 E 4957.41
9812.29 4741.60 4700.00 5154.44 N 5417.04 E 5070.69 113.28
10172.39 4841.60 4800.00 5487.78 N 5509.40 E 5330.79 260.09
10531.11 4941.60 4900.00 5816.97 N 5610.89 E 5589.51 258.72
10874.58 5041.60 5000.00 6130.65 N 5708.65 E 5832.98 243.47
11206.70 5141.60 5100.00 6435.12 N 5795.76 E 6065.10 232.12
11552.14 5241.60 5200.00 6752.23 N 5889.37 E 6310.54 245.44
11893.52 5341.60 5300.00 7065.86 N 5979.60 E 6551.92 241.38
12248.99 5441.60 5400.00 7394.53 N 6070.83 E 6807.39 255.47
12582.77 5541.60 5500.00 7700.22 N 6160.01 E 7041.17 233.78
12903.44 5641.60 5600.00 7991.92 N 6247.84 E 7261.84 220.66
13208.28 5741.60 5700.00 8266.76 N 6333.66 E 7466.68 204.85
13529.90 5841.60 5800.00 8559.58 N 6421.26 E 7688.30 221.62
13875.09 5941.60 5900.00 8874.89 N 6519.80 E 7933.49 245.19
14192.81 6041.60 6000.00 9163.46 N 6607.29 E 8151.21 217.72
14479.48 6141.60 6100.00 9420.59 N 6685.08 E 8337.88 186.68
14723.04 6241.60 6200.00 9632.73 N 6750.36 E 8481.44 143.56
14925.60 6341.60 6300.00 9799.65 N 6806.34 E 8584.00 102.56
15100.56 6441.60 6400.00 9935.16 N 6853.47 E 8658.96 74.96
15256.90 6541.60 6500.00 10047.72 N 6895.43 E 8715.30 56.35
15400.57 6641.60 6600.00 10143.94 N 6932.47 E 8758.97 43.67
15535.00 6741.60 6700.00 10228.30 N 6963.27 E 8793.40 34.43
15662.70 6841.60 6800.00 10302.98 N 6990.15 E 8821.10 27.70
15784.93 6941.60 6900.00 10368.69 N 7015.03 E 8843.33 22.23
15904.83 7041.60 7000.00 10430.51 N 7038.52 E 8863.23 19.90
16023.00 7141.60 7100.00 10489.52 N 7060.46 E 8881.40 18.17
16139.72 7241.60 7200.00 10546.09 N 7081.01 E 8898.12 16.72
16255.37 7341.60 7300.00 10600.89 N 7100.30 E 8913.77 15.65
16369.85 7441.60 7400.00 10653.41 N 7118.93 E 8928.25 14.48
16482.95 7541.60 7500.00 10702.89 N 7137.41 E 8941.35 13.10
16604.00 7650.05 7608.45 10753.20 N 7156.39 E 8953.95 12.60
THE CALCULATION PROCEDURES USE A LINEAR INTERPOLATION BETWEEN
THE NEAREST 20 FOOT MD (FROM MINIMUM CURVATURE) POINTS
6/3O/97
GeoQuest
500 W. International Airport Road
Anchorage, AK 99518-1199
A'I-rN: Sherrie
NO. 11118
Company:
Field:
Alaska Oil & Gas Cons Comm
Attn: Lori Taylor
3001 Porcupine Drive
Anchorage, AK 99501
Milne Point (Cased Hole)
Well Job # Log Description Date BL
RF Sepia LIS Tape
MPU B-14 L.~- ~ £ ..... INJECTION PROFILE 970607 I 1
MPU E-07 ~x_ ~ (._. INJECTION PROFILE 970606 I 1
MPU E-16 ~-" INJECTION PROFILE 970605 I 1
MPU F-05 ~--' PERFORATION RECORD 97051 7 I 1
M PU F-05 ~-~' TEMP & PRESSURE SURVEY 97051 7 I 1
MPU F-05 ~" GPJCCL LOG 970517 I 1
MPU F-26 ~.-" GPJCCL LOG 970525 I 1
MPU F-26 ~" STATIC PRESS &TEMP 970527 1 1
MPU F-26 v' PERFORATION RECORD 970527 I 1
--
MPU F-50 ..... PERFORATION RECORD 970508 1 1
MPU F-50 ,,'"' STATIC PRESSURE SURVEY 970509 1 1
MPU F-57 ',"'* PERFORATION RECORD 97051 2 1 1
MPU F-62 ~," ~-.~,.I ( INJECTION PROFILE 970608 1 1
MPU F-65 ,.--' PERFORATION RECORD 97051 1 1 1
MPH -07 ~.,-' GR/CCLRECORD 970424 I 1
........
MPH -07 '~" GR/CCL RECORD 970427 1 1
PLEASE ACKNOWLEDGE RECEIPT BY SIGNING AND RETURNING ONE COPY EACH TO:
BP Exploration (Alaska) Inc.
Petrotectnical Data Center MB3-3
900 E. Benson Blvd.
Anchorage,' Alaska 99519-6612
Date Delivered:
Schlumberger GeoQuest
500 W. International Airport Road
Anchorage, Alaska 99618-1199
Received ~~'
Schlumberger - GeoQuest
A Division of Schlumberger Technologies Corporation
500 W. International Airport Road
Anchorage. Alaska 99518 - 1199
(907) 582-7669 (Bus.)
(907) 563°3309 (Fax)
June 20, 1997
TO:
BP Exploration (Alaska) Inc.
Petrotectnical Data Center MB3-3
900 E. Benson Blvd.
Anchorage, Alaska
99519-6612
The following data of the MWD Depth Corrected CDR/ADN, CDR/ADN TVD'S & GR/CCL for
well MPF-57, Job Cf 97231 was sent to:
BP Exploration (Alaska) Inc.
Petrotechnical Data Center, MB3-3
900 E. Benson Blvd.
Anchorage, AK 99519-6612
1 OH LIS Tape
3 Bluelines each
1 Film each
1 Depth Shift Display
State of Alaska
Alaska Oil & Gas Conservation
Attn: Lori Taylor
3001 Porcupine Drive
Anchorage, AK 99501
1 O!~, LIS Tape
1 Blueline each
1 RF Sepia each
OXY USA, Inc.
Attn: Darlene Fairly
P.O. Box 50250
Midland, TX 79710
1 OH LIS Tape
1 Blueline each
I RF Sepia each
Sent Certified Mail: P 067 695 350
PLEASE ACKNOWLEDGE RECEIPT BY SIGNING AND RETURNING ONE COPY EACH TO:
BP Exploration (Alaska)Inc.
Petrotectnical Data Center MB3-3
900 E. Benson Blvd.
Anchorage, Alas~ ~9.5~..9~61.2 ~ ~_;
Schlumberger GeoQuest
500 W. International Airport Road
Anchorage, Alaska 99618-1199
Received by:~/~)--/
Surface MWD Directional surface to TD. LWD Gamma Ray surface to TD
Intermediate N/A
Fin al MWD Directional and LWD Triple Combo CDR/CDN
(GR/RES/Dens/Neu).
Cased Hole Logs: N/A
Mudloggers are NOT required for this well.
Mud Program:
Special design I None-SPUD MUD J
considerations
Surface Mud Properties' I
Density Marsh Yield 10 sec 10 min pH Fluid
(PPG) Viscosity Point gel gel Loss
8.6 50 15 8 10 9 8
to to to to to to to
9.4 150 35 1 5 30 1 0 1 5
Intermediate Mud Pro=erties: N/A I
Density Marsh Yield 10 sec 10 min pH Fluid
(PPG) Viscosity Point gel gel Loss
Production Mud Properties: I LSND freshwater mud
Density Marsh Yield 10 sec 10 min pH Fluid
(PPG) Viscosity Point gel gel Loss
8.6 35 6 3 7 8.5 6 - 1 2
to to to to to to to
10.0 50 20 1 0 20 9.5 4-6
Well Control'
At the time this request for Permit to Drill went out Shared Services Drilling is routing a letter requesting a
blanket waiver from utilization of a diverter for surface hole at Milne Point 'F' Pad based on drilling history.
In case the abovementioned request has not reached AOGCC before this request for Permit to Drill MP F-57,
Shared Services Drilling requests your consideration of a waiver of the diverter system identified in 20 AAC
25.035 (7)(b) "Secondary Well Control: Blowout Prevention Equipment (BOPE) Requirements" for MP F-57
based upon historical drilling experience on 'F' Pad in the Milne Point Unit.
To date, there have been 31 wells drilled on Milne Point 'F' Pad. None of these wells experienced any
difficulty with shallow gas in the interval prior to placement of surface casing to depths not exceeding 5000'
TVD Sub Sea.
In light of the historical evidence indicating virtually no risk due to shallow gas at Milne Pt. 'F' Pad within the above
mentioned interval, it is requested that forthcoming wells on the pad - for as long as the drilling on 'F' Pad remains
continuous - can be drilled without the installation of the diverter system. A 20" riser will be installed to act as a
conduit to facilitate drilling mud flow.
Well control equipment consisting of 5000 psi W.P. pipe rams, blind rams, and annular preventer will
be installed after setting surface casing and is capable of handling maximum potential surface
pressures.
BOPE and drilling fluid system schematics on file with AOGCC.
Directional'
IKOP: 1300'
IMaximum Hole Angle:
Close Approach Well:
72.79°
Disposal-
Cuttings Handling: Cuttings and drilling waste fluids should be hauled to the ball mill at CC-2A. The
Milne Point reserve pit can be opened in emergencies by notifying Karen Thomas (564-4305) with
request.
,
.
.
.
.
.
.
,
.
10.
11.
12.
13.
14.
15.
MP F-57
Proposed Summary of Operations
Drill and Set 20" Conductor. Weld a starting head on conductor.
Prepare location for rig move.
MIRU Nabors 22E drilling rig.
NU 20" riser. Build Spud Mud.
Drill a 12-1/4" surface hole as per directional plan. Run Directional MWD and LWD GR from
surface to TD.
Run and cement 9-5/8" casing.
ND riser. NU and test 13-5/8" BOP.
MU a PDC bit on a motor, with Directional MWD and LWD CDR/CDN (GR/RES/Dens/Neu). RIH,
Drill out Float Equipment and 20' of new formation. Perform LEAKOFF TEST. If LOT EMW is
less than 12.5 ppg contact appropriate superintendent.
Drill 8.5" hole to TD as per directional plan.
Run and Cement 7", 26#, L-80, Buttress-Modified casing. Displace cement with completion
fluid and enough diesel to cover from the base of permafrost to surface.
Test casing to 3500 psig for 30 min.
ND BOPE, NU and Test Tree. RDMO Nabors 22E drilling rig to drill next well.
MIRU completion rig. NU & Test BOPE to 5000 psig.
Complete well with 2-7/8" tubing.
Install Surface Lines and Wellhouse and turn well over to production.
DRILLING HAZARDS AND RISKS:
See the updated Milne Point F-Pad Data Sheet prepared by Pete Van Dusen for information on F
pad and review recent wells drilled on F Pad. Most of the trouble time on recent wells has been due
to equipment mechanical problems with the surface equipment, rather than formation drilling
problems.
The MPU PE group MAY be perforating, hydraulic fracturing and cleaning out wells shortly after
the rig drills and completes them. This will make the near rig area congested and as a result
potentially hazardous. Ensure personnel use caution moving around adjacent production activities.
Close Approach:
There are no close approaches associated with the drilling of MP F-57.
Lost Circulation:
There has not been any appreciable amount of lost circulation on any of the F Pad wellls to date.
Stuck Pipe Potential'
Well MPF-53 was stuck coming out on the short trip at surface casing point. Proir to this
incident there was only minor indications that the gravel and coal were present. It appears that we
dragged the gravel up into the bottom of the curve and reduced our ability to move up or down.
Then we lost the ability to circulate when the hole collapsed.
If significant gravels are encountered stop and raise funnel viscosity to 150 cp viscosity
immediately.
Formation Pressure:
The expected pore pressure for this well is 9._~pg EMW (3,689 psi @ 7,391' TVD). However, there
has been injection from MP L-21i in this region and there ~otential that the reservoir pressure
could be as high as 10.8 ppg EMW (4150 psi @ 7,391' TVD). If 10.8 ppg EMW is encountered it
should not pose a threat to the integrity of the well. The Kuparuk has held mudweights of 11.2 ppg on
Sag River wells with a Iongstring design.
CASING
SPACER:
MP F-57
9-5/8" SURFACE CASING
CEMENT PROGRAM - HALLIBURTON
SIZE: 9-5/8" CIRC. TEMP 60 deg F at 2840' TVDSS.
75 bbls spacer weighted to mudweight in the hole.
STAGE1 LEAD:
ADDITIVES:
WEIGHT:
APPROX #SACKS:
TYPE 'E' PERMAFROST
Retarder + CELLO-FLAKES (1/4 lb/sack)
12.0 ppg YIELD:2.17 ft3/sx MIX WATER: 11.63 gal/sk
600 SACKS THICKENING TIME: Greater than 4 hrs at 50° F.
ANUULAR VOLUME FROM 100 FEET TVD ABOVE
SCHRADER BLUFF TO BASE OF PERMAFROST AT 1800'
MD +30% EXCESS +ANNULAR VOLUME FROM 1800' MD
TO STAGE COLLAR AT 1300' MD +200% EXCESS.
STAGE1 TAIL CEMENT TYPE: PREMIUM 'G'
ADDITIVES:
WEIGHT:
APPROX #SACKS:
FLUID LOSS:
0.2% CFR-3 + 0.20% HALAD-344 + CELLO-FLAKES
15.8 ppg YIELD:l.15 ft3/sx MIX WATER: 5.0 gal/sk
I 829 THICKENING TIME: Greater than 4 hrs at 50° F.
100-150 cc FREE WATER: 0
TAIL CEMENT FROM TD TO 100 FEET MD ABOVE TOP of
Schrader Bluff + 30% EXCESS + 80'md 9-5/8", 40#
capacity for float joints.
STAGE2 LEAD:
TYPE 'E' PERMAFROST
ADDITIVES: R eta rd e r
WEIGHT: 12.0 ppg
APPROX #SACKS'
YI ELD:2.17 ft3/sx
MIX WATER: 11.63 gal/sk
563 SACKS THICKENING TIME: Greater than 4 hrs at 50° F.
ANUULAR VOLUME FROM STAGE COLLAR AT 1300' MD TO
SURFACE+ 200% EXCESS.
WELLHEAD STABILITY CEMENT TYPE: Permafrost E
NOTE:
ADDITIVES: Retarder
WELLHEAD STABILITY CEMENT WILL BE PUMPED ONLY WITH
APPROVEL OF APPROPRIATE SUPERINTENDENT IF THERE ARE
NO CEMENT RETURNS TO SURFACE OR THE CEMENT TOP FALLS
BELOW SURFACE AFTER THE PUMPS ARE SHUT DOWN.
WEIGHT: 12.0 ppg
YIELD:2.17 ft3/sx
MIX WATER: 11.63 gal/sk
APPROX NO SACKS: 150
RECIPROCATE CASING STRING WHILE CEMENTING IF POSSIBLE/PRACTICAL
CENTRALIZER PLACEMENT:
1. 1 Bowspring centralizer per joint of 9-5/8" casing on bottom 15 joints of casing (15
required).
2. Place all centralizers in middle of joints using stop collars.
OTHER CONSIDERATIONS: Perform lab tests on mixed cement/spacer/mud program and
ensure compatibility prior to pumping job. Ensure thickening times are adequate
relative to pumping job requirement. Displace at 12 - 15 bpm. Mix slurry on the fly -
-batch mixing is not necessary.
MAR 0 5 1997
0il & Gas Cons. Commissior,.
Anchorage
MP F-57 Well
7" PRODUCTION CASING
CEMENT PROGRAM- HALLIBURTON
SINGLE STAGE CEMENT JOB ACROSS THE KUPARUK INTERVAL:
CIRC. TEMP- 140° F
BHST 170° F at 7040' TVDSS.
SPACER: 20 bbls fresh water
70 bbls Alpha Spacer mixed as per Halliburton specifications weighted to 1.0 ppg above
current mud weight.
CEMENT TYPE: Premium G
ADDITIVES:
WEIGHT: 15.8ppg
APPROX # SACKS:
0.2% CFR-3, 0.1% HR-5, 0.4% Halad 344
YIELD: 1.15 cu ft/sk MIX WATER: 5.0 gal/sk
229 SACKS
FLUID LOSS:
THICKENING TIME: 3 1/2 - 4 1/2 hrs @ 140° F
< 50cc/30 min @ 140° FREE WATER: 0cc @ 45 degree angle.
CENTRALIZER PLACEMENT:
.
.
7" x 8-1/4" Straight Blade Rigid Centralizers. Two per joint on the bottom 20 joints of 7"
casing (40). This will cover ___300' above the KUPARUK Sand.
Run two (2) 7" x 8-1/4" Straight Blade Rigid Centralizers on the second full joint inside the
9-5/8" casing shoe.
OTHER CONSIDERATIONS:
Perform lab tests on mixed cement/spacer/mud program and ensure compatibility prior to
pumping job. Ensure thickening times are adequate relative to pumping job requirement.
Displace at 8-10 bpm. Batch mixing is not necessary,
CEMENT VOLUME:
,
Single stage cement job is calculated to cover 1000 FT MD above the Kuparuk 'C' Sand
with 30% excess.
i
i
SHARED
iii ii ii
i
-. ,,
SERV ICES DR I NG
iiii ii i i i ii · i i i
ii i i i i ii i ii i ·
i i i
Anadri ] ] $ch]umberge£
,MPF-57 (PJOi'"
VERTICAL SECTION VIEW
.i i i
Section at: 44.53
TVD Scale.· j inch = 2000 feet
Dep SCale.' ~ inch = 2000 feet
iii I ii
I Al KB 0 0 .0 00~
6
C .- - BI .KOP/BUILD 11100 300 300 0 0.(~
D' -I C). BUILO 1.5/t00 500 500 3 ;:).0,
. 'E ~. O) BUILD 2/t00 ' BO0 799 24 6.5'
. El BUILD 2.5/100 1200 lie;? 90 14.5,
N.
.
' F) ENO 2.5/tOO,BUILD t832 t775 ,31i 30.3
- '~ , .. ' ~a~"pO~ r~r-i~ Gl CURVE 2.5/t00 1892 18L:)6 338 30.3
., G~ H} END 2.5/100 CURVE 3723 2948 t7.10 72.7
,~ II 9-5/8' CASING POINT 8920 4486 6675 72.7
'' J) ~OP3/lO0 i438i. 6i02 t'tD91 72.7
......... K) END 3/tOODROP' 15808 .6972 12980 30;0
-'"~.,,,~' ' L) 'TARGET 16293 . 7392 t3;~23 30.0
'~ ~.~ 141 7' CASING POINT i6702 7746 J3427 30.0
k
~_ ........ ' ............... N} TO 16702 7746 13427 30:0
.
I
~ .
t- _'~'_'Z~':----- ;' --: =----=-- -=--== :~=-=-~ ~' :=----' ..... -- :'"-"'-'~-------
0 lO00 2000 3000 4000 5000 6000 7000 8000 9000 lO000 iiOOO 12000 13000 14000 i5000 i6000 17000
.... Sect ion ueparco, Ee ..............
IAnaclr]]! (c)97 NPF'5~]O 3.0C 4;50 PN Pt
,,I
0
>
J,
0
'U
0
~)
0
4~
4~
Feb-28-97 04:sgP Ariadne33 DPC
907 344 2160 P.07
Marker IUentifJcat'1on 140 8KB SEIi. TN INCLN ' . '
c~ ,o ~7o~ ~ ~ ~o.oo VERTICAL SECTION VIEW
Section at: 44.53
TVO Scale · ~ inch = ~00 feet
,~u-~~, ! __]LJepSca]e.: J inch-- ~00 feet
~oo- I ~nad~J ]] SchYu~be~ge~
! .............. ' .....
m~~
50-
~o- ~~ ~~~ ~ (naa ~et }
.
o-~~ """' ---
~3000 I3050 I3100 13~50 ~3200 (3P~O 4qqnn ~=qcn J3400 ~3450 ~3500 13550 ~0 ~3650 I3700
Sect ion De
-Feb,-28-97 05=OOP Anadrill DPC
907 344 2160 P.08
SHARED SERVICES DRILLING
ii i ii . i i i
~l.r.k.r :l:¢ent,ficat.,on ,D N/S E/It MPF--57 (P 0)
,,1 ,<~ o .0 ..
~omu~o ~/~oo ~oo o,- o~ ~ PLAN VIEW
D} BUILD 2/~00 800 ~0 N' 24 [ ' --
El BUILD 2.§/~00 ~20D 37 N ~ E. CLOSURE ' ~2432 feet at Azimuth 45.99
END 2.5/~00 BUILD ~832 ~27 N 314 E
[I CURVE ~.5/~00 ~Bg2 ~ N ~42 E )DECLINATION.' +28.079 (E)
· H) END e.5/~O0 CURVE 3~23 .980 N ~443 E SCALE ' ~ inch = 2000 feet
I) 9-5/8" CASING POINT 8920 - 45~9 N 4924 E
d) DROP 3/100 ' 1438~ - BZ3B N 85~-E mDRAWN. ' 28 Feb ~997
K) END 3/100 ~OP ~5808 90~ N 9346 E
L) TAR6ET 16293 9~87 N ~!6 E ·
.). TD ~o~ ~3~ N ~ E ~nadr~]] Schlumberger
.
.
.
.
~000-- - ........
.
.
~0000 ....... ,
-., -..., , ~
,,.' ,.. ~.L A,:"'..~'.,. DF'
¢oo-- ' " ' .... :'"' ,'
/.~, .... . FOR
l
~ooo i E)-':E' I0~
- . .... ..
7000- - : ,
. ~000 .... . ', ~ '~ .....
.
~ :
4000 ' ..
~000 ~ - .........
~000- ~ ,,.
.
.
~ ~ ....
~ ·
z
.
O-
~ .
~ . .
~ l- .
10o0-
~ I . i I
1000 0 ~0~ 2000 3000 4000 I ~0~ ~00 7000 I 8000 ~0~ 10~0 11000 1~000 t3000'
(-.~EST ' EAST -~
~1 i I
L~aOe}}] (c}~? NI=F57PlO 3.0C 4:55 P# I~)
WELL PERMIT CHECKLISToo Y /¢£/--5'7
ADMINISTRATION
ENGINEERING
GEOLOGY
1. Permit fee attached ................... N
2. Lease number appropriate ............... N
3. Unique well name and number .............. N
4. Well located in a defined pool ............. N
5. Well located proper distance from drlg unit boundary. . N
6. Well located proper distance from other wells ..... N
7. Sufficient acreage available in drilling unit ..... N
8. If deviated, is wellbore plat included ........ N
9. Operator only affected party .............. N
10. Operator has appropriate bond in force ......... N
11. Permit can be issued without conservation order .... N
12. Permit can be issued without administrative approval. . N
13. Can permit be approved before 15-day wait ....... N
PROGRAM: expF1 dev~redrlD servF] wellbore segF] ann disp para req~
UNIT# //J ~_~ ON/OFF SHORE ~:~f%)
14.
15.
16.
17.
18.
19.
20.
21.
22.
23.
24.
25.
26.
27.
28.
29.
REMARKS
Conductor string provided ............... ~__
Surface casing protects all known USDWs ........
CMT vol adequate to circulate on conductor & surf cng.
adequate to tie-in long string to surf cng . . .~Y
CMT
vol
CMT will cover all known productive horizons ......
Casing designs adequate for C, T, B & permafrost .... N
Adequate tankage or reserve pit ............ .~ N
If a re-drill, has a 10-403 for abndnmnt been approved.
If diverter required, is it adequate ..........
Drilling fluid program schematic & equip list adequate .~ N
BOPEs adequate .....................
BOPE press rating adequate; test to ~~ psig. ~ N ~
Choke manifold complies w/API RP-53 (May 84) ...... N
Work will occur without operation shutdown ....... ( ~ N
Is presence of H2S gas probable ............ ~ ) N
30.
Permit
can be issued w/o hydrogen sulfide measures .... Y N/~
31. Data presented on potential overpressure zones .....
32. Seismic analysis of shallow gas zones ......... ~ N
33. Seabed condition survey (if off-shore) ....... J. Y N
34. Contact name/phone for weekly progress reports . . ~/. . Y N
[exploratory only]
Comments/Instructions:
GEOLOGY: ENGINEERING: COMMISS ION:
JDH ,~ mcm
HOW/dlf- A:\FORMS\cheklist rev 01/97
Well History File
APPENDIX
Information of detailed nature that is not
particularly germane to the Well Permitting Process
but is part of the history file.
To improve the readability of the Well History file and to
simplify finding information, information of this
nature is accumulated at the end of the file under APPENDIX.
No special effort has been made to chronologically
organize this category of information.
* ALASKA COMPUTING CENTER *
. ............................ .
....... SCHLUMBERGER
JUN 26 199T
Ala~a ~ & G~ Cons..Com~n
COMPANY NAME : BP EXPLORATION
WELL NAME : MP F- 57
FIELD NAME : MILNE POINT
BOROUGH : NORTH SLOPE
STATE : ALASKA
API N-JMBER : 50-029-22747-00
REFERENCE NO : 97231
LIS Tape Verification Listing
Schlumberger Alaska Computing Center
19-JUN-1997 11:51
PAGE:
**** REEL HEADER ****
SERVICE NAME : EDIT
DATE · 97/06/19
ORIGIN : FLIC
REEL NAME : 97231
CONTINUATION # :
PREVIOUS REEL :
COMMENT : B.P. EXPLORATION, MILNE POINT MP F-57, API #50-029-22747-00
**** TAPE HEADER ****
SERVICE NAME : EDIT
DATE : 97/06/19
ORIGIN : FLIC
TAPE NAME : 97231
CONTINUATION # : 1
PREVIOUS TAPE :
CO~4~NT : B.P. EXPLORATION, MILNE POINT MP F-57, API #50-029-22747-00
TAPE HEADER
MILNEPOINT
MWD/MAD LOGS
WELL NAME:
API NUMBER:
OPERATOR:
LOGGING COMPANY:
TAPE CREATION DATE:
JOB DATA
JOB NUMBER:
LOGGING ENGINEER:
OPERATOR WITNESS:
SURFACE LOCATION
SECTION:
TOWNSHIP:
RANGE:
FNL:
FSL:
FEL:
ELEVATION (FT FROM MSL O)
KELLY BUSHING:
DERRICK FLOOR:
GROUND LEVEL:
BIT RUN 1
.........
97231
BOSSE
DIXON
WELL CASING RECORD
1ST STRING
2ND STRING
MP F-57
500292274700
BP ~PLORATION
SCHLUMBERGER WELL SERVICES
19-JUN-97
BIT RUN 2 BIT RUN 3
6
13N
iOE
2052
2555
40.80
40.80
12.10
OPEN HOLE CASING DRILLERS
BIT SIZE (IN) SIZE (IN) DEPTH (FT)
8.500 9. 625 9460.0
LIS Tape Verification Lis.ting
Schlumberger Alaska Computing Center
19-JUN-1997 11:51
3RD STRING
PRODUCTION STRING
REMARKS
CONTAINED HEREIN IS THE LDWG FORMATTED LOGGING WHILE
DRILLING CDR/ADN DATA ACQUIRED ON BP EXPLORATIONS
MP F-57 WELL.
$
$
PAGE:
**** FILE HEADER ****
FILE NAME : EDIT .001
SERVICE : FLIC
VERSION : O01CO1
DATE : 97/06/19
MAX REC SIZE : 1024
FILE TYPE : LO
LAST FILE :
FILE HEADER
FILE~ER: 1
EDITED~RGEDMWD
Depth shifted and clipped curves; all bit runs merged.
DEPTH INCREMENT: 0.5000
FILE SUFk~ARY
LDWG TOOL CODE START DEPTH
MWD 40.0
CDR 9478.0
ADN 9460.0
$
BASELINE CURVE FOR SHIFTS: GRCH
CURVE SHIFT DATA (MEASURED DEPTH)
BASELINE DEPTH
88888.0
16519.5
16492.5
16470.0
16438.5
16404.0
16396.0
16391.5
16387.5
16376.5
16368.0
16359.5
16343.0
16321.0
16310.5
16301.5
STOP DEPTH
9400.0
16760.0
16646.0
.......... EQUIVALENT UNSHIFTED DEPTH ..........
CDR /ADN
88899.5
16531.0
16503.5
16481.0
16449.5
16415.5
16408.0
16403.0
16399.5
16388.5
16379.5
16371.5
16354.5
16333.0
16322.0
16312.5
LIS Tape Verification Listing
Schlumberger Alaska Computing Center
16281.5
16266.0
16255.5
16250.5
16224.0
16214.5
16201.0
16171.0
16158.5
16125.5
16093.0
16069.0
16056.0
16050.5
16023.5
16000.5
15988.0
15963.5
15931.0
15888.0
1588O 0
15873 0
15843 5
15834 0
15810 0
15750 0
15669.0
15627.0
15621.5
15611.0
15580.5
15567.0
15540.5
15502.0
15451.0
15410.0
15401.0
15339.0
15292.5
15222.5
15191.0
15171.5
15159.0
15140.0
15125.5
15116.0
15086.5
15069.5
15048.5
15022.0
15002.0
14985.5
14942.5
14919.5
14912.0
16293.0
16277.5
16266.5
16261.5
16235.5
16225.5
16212.0
16181.5
16169.0
16136.5
16103.5
16079.0
16066.5
16060.5
16034.0
16011.5
15997.0
15973.0
15940.5
15897.0
15889.5
15881.0
15853.0
15842.5
15818.0
15759.0
15679.0
15637.0
15632.5
15620.5
15589.0
15577.5
15550.5
15511.5
15460.5
15419.0
15410.5
15349.0
15302.5
15232.5
15201.0
15181.0
15167.5
15150.5
15136.5
15126.0
15096.0
15078 5
15058 0
15031 0
15011 5
14995 5
14954 5
14932.5
14924.5
19-JUN-1997 11:51
PAGE:
LIS Tape Verification Lis<ing
Schlumberger Alaska Computing Center
14893.5
14862.0
14844.5
14746.5
14714.5
14671.0
14647.0
14615.5
14562.5
14537.5
14524.5
14477.5
14448.0
14422.5
14392.0
14330.0
14285.0
14254.0
14161.5
14133.0
13967.0
13950.5
13944.5
13917.0
13893.5
13863.0
13836.5
13810.5
13787 5
13774 0
13746 5
13728 0
13719 5
13678 5
13659 5
13647 5
13616.0
13576.5
13537.5
13486.0
13417.5
13401.0
13346.5
13287.0
13260.5
13226.5
13196.5
13180.0
13160.5
13141.0
13119.0
13093.5
13074.5
13043.5
13022.0
14904.5
14871.5
14855.5
14756.5
14724.5
14680.5
14656.5
14626.0
14571.5
14547 5
14534 5
14488 0
14459 5
14433 0
14402 0
14339 0
14293 0
14261 5
14169 0
14141 5
13975.5
13957.5
13952.5
13923.0
13899.5
13869.5
13843.5
13818.5
13792.0
13781.0
13755.5
13736.0
13727.0
13685.5
13667.0
13654.0
13622.5
13583.0
13545.0
13494.0
13425.0
13409.5
13355.5
13294.0
13267.0
13234.5
13204.0
13187.0
13166.5
13147.5
13125.5
13100.5
13082.5
13051.0
13030.0
19-JUN-1997 11:51
PAGE:
LIS Tape Verification Listing
Schlumberger Alaska Computing Center
12993.5
12979.5
12932.5
12917.0
12867.0
12854.0
12831.0
12822.5
12816.5
12787.5
12778.5
12763.5
12759.0
12738.5
12705.5
12682.5
12657.0
12630.0
12558.0
12518.0
12467.0
12444 5
12432 5
12414 0
12391 0
12379 0
12371 5
12354 5
12345 0
12317 0
12305.0
12280.0
12248.0
12216.5
12190.5
12169.5
12078.0
12067.5
12022.5
11950.5
11942.0
11935.0
11920.5
11909.5
11894.0
11833 5
11804 5
11769 5
11752 0
11745 5
11681 5
11640.5
11619.5
11603.5
11587.0
13001.0
12986.5
12939.0
12924.0
12874.0
12860.5
12837.5
12829.0
12824.0
12792.0
12786.5
12770.0
12766.0
12745.5
12712.0
12688.5
12662.0
12635.5
12565.5
12526.5
12472.5
12449.5
12438.0
12418.0
12393.0
12381.5
12374.0
12357.5
12348.5
12318.0
12307.0
12283.5
12251.5
12218.5
12193.0
12171.0
12078.5
12068.5
12020.5
11951.0
11941.5
11933.5
11919.5
11909.5
11894.0
11833.5
11806.0
11772.0
11753.5
11747.5
11683.0
11640.5
11617.5
11601.5
11586.0
19-JUN-1997 11:51
PAGE:
LIS Tape Verification Listing
Schlumberger Alaska Computing Center
19-JUN-1997 11:51
PAGE:
9907.5 9907.0
9871.0 9869.5
9844.0 9842.5
9817.5 9815.0
9770.5 9768.5
9740.5 9739.0
9697.0 9695.5
9647.5 9645.5
9599.0 9597.0
9548.5 9547.5
9514.5 9512.0
9498.5 9496.5
9481 . 5 9479.5
9467.0 9465.0
9460.0 9459.0
9442.5 9439.0
9376.0 9374.0
9351 . 5 9349.5
9340.0 9337.5
9322.0 9321 . 0
9312.5 9312.0
9254.5 9255.5
9248.5 9250.0
9222.5 9225.0
9194.0 9196.5
9158.0 9160.5
9143 . 5 9141 . 0
9127.0 9124.0
100.0 97.0
$
MERGED DATA SOURCE
LDWG TOOL CODE
LWD
$
REMARKS:
BIT RUN NO. MERGE TOP MERGE BASE
1 40.0 6225.0
2 6225.0 9475.0
1 9475.0 16690.0
THIS FILE CONTAINS THE DEPTH CORRECTED MEASURMENT
WHILE DRILLING GAMMA RAY AND LOGGING WHILE
DRILLING CDR/ADN DATA. THIS DATA HAS BEEN
DEPTH CORRECTED TO SCHLUMBERGER'S
CASED HOLE GAR~IA RAY AND CASING COLLAR LOG
DATED il-MAY-1997.
$
LIS FORMAT DATA
LIS Tape Verification Listing
Schlumberger Alaska Computing Center
19-JUN-1997 11:51
PAGE:
** DATA FORMAT SPECIFICATION RECORD **
** SET TYPE- 64EB **
TYPE REPR CODE VALUE
1 66 0
2 66 0
3 73 72
4 66 1
5 66
6 73
7 65
8 68 0.5
9 65 FT
11 66 14
12 68
13 66 0
14 65 FT
15 66 68
16 66 1
0 66 0
** SET TYPE - CHAN **
NAME SERVUNIT SERVICE API API API API FILE NUM~ NUMB SIZE REPR PROCESS
ID ORDER # LOG TYPE CLASS MOD NUMB SAMP ELEM CODE (HEX)
DEPT FT 39503 O0 000 O0 0 1 1 1 4 68 0000000000
FET MWD HR 39503 O0 000 O0 0 1 1 1 4 68 0000000000
RA MWD 0H~39503 O0 000 O0 0 1 1 1 4 68 0000000000
RP MWD OH~ff439503 O0 000 O0 0 1 1 1 4 68 0000000000
VRA MWD OPIUM39503 O0 000 O0 0 1 1 1 4 68 0000000000
VRP MWD OH~M 39503 O0 000 O0 0 1 1 1 4 68 0000000000
DER MWD OH~f39503 O0 000 O0 0 1 1 1 4 68 0000000000
ROP MWD FPHR 39503 O0 000 O0 0 1 1 1 4 68 0000000000
GR MWD GAPI 39503 O0 000 O0 0 1 1 1 4 68 0000000000
RHOB MWD G/C3 39503 O0 000 O0 0 1 1 1 4 68 0000000000
RHO1 MWD G/C3 39503 O0 000 O0 0 1 1 1 4 68 0000000000
RH02 MWD G/C3 39503 O0 000 O0 0 1 1 1 4 68 0000000000
RH03 MWD G/C3 39503 O0 000 O0 0 1 1 1 4 68 0000000000
RH04 MWD G/C3 39503 O0 000 O0 0 1 1 1 4 68 0000000000
DRHOMWD G/C3 39503 O0 000 O0 0 1 1 1 4 68 0000000000
PEF MWD BN/E 39503 O0 000 O0 0 1 1 1 4 68 0000000000
DCALMWD IN 39503 O0 000 O0 0 1 1 1 4 68 0000000000
NPHIMWD PU-S 39503 O0 000 O0 0 1 1 1 4 68 0000000000
** DATA **
LIS Tape Verification Listing
Schlumberger Alaska Computing Center
19-JUN-1997 11:51
PAGE:
DEPT. 16760.000 FET.MWD
VRA.MWD -999.250 VRP.MWD
GR.MWD -999.250 RHOB.MWD
RHO3.MWD -999.250 RHO4.MWD
DCAL.MWD -999.250 NPHI.MWD
DEPT. 40.000 FET.MWD
VRA.MWD -999.250 VRP.MWD
GR.MWD 19.850 RHOB.MWD
RHO3.MWD -999.250 RHO4.MWD
DCAL.MWD -999.250 NPHI.MWD
-999.250 RA.MWD
-999.250 DER.MWD
-999.250 RHO1.MWD
-999.250 DRHO.MWD
-999.250
-999.250 RA.MWD
-999.250 DER.MWD
-999.250 RHO1.MWD
-999.250 DRHO.MWD
-999.250
-999.250 RP.MWD
-999.250 ROP.MWD
-999.250 RHO2.MWD
-999.250 PEF.MWD
-999.250 RP.MWD
-999.250 ROP.MWD
-999.250 RHO2.MWD
-999.250 PEF.MWD
-999.250
113.918
-999.250
-999.250
-999.250
-999.250
-999.250
-999.250
** END OF DATA **
**** FILE TRAILER ****
FILE NAME : EDIT .001
SERVICE : FLIC
VERSION : O01CO1
DATE : 97/06/19
MAX REC SIZE : 1024
FILE TYPE : LO
LAST FILE :
**** FILE HEADER ****
FILE NAME : EDIT .002
SERVICE : FLIC
VERSION : O01CO1
DATE : 97/06/19
MAX REC SIZE : 1024
FILE TYPE : LO
LAST FILE
FILE HEADER
FILE 1VUbfBER 2
RAW MWD
Curves and log header data for each bit run in separate files.
BIT RUN NUMBER: 1
DEPTH INCREMENT: O . 5000
FILE S~Y
VENDOR TOOL CODE START DEPTH STOP DEPTH
MWD 40.0 6225.0
MWD 6225.0 9475.0
LWD 9475.0 16760.0
$
LOG HEADER DATA
LIS Tape Verification Lis~ing
Schlumberger Alaska Computing Center
19-JUN-1997 11:51
PAGE: 10
DATE LOGGED:
SOFTWARE:
SURFACE SOFTWARE VERSION:
DOWNHOLE SOFTWARE VERSION:
DATA TYPE (MEMORY or REAL-TIME):
TD DRILLER (FT) :
TOP LOG INTERVAL (FT):
BOTTOM LOG INTERVAL (FT) :
BIT ROTATING SPEED (RPM) :
HOLE INCLINATION (DEG)
MINIMUM ANGLE:
MAXIMUM ANGLE:
22-MAR-97
FAST-4.0 011
_
MEMORY
16760.0
40.0
16760.0
8O
72.0
TOOL STRING (TOP TO BOTTOM)
VENDOR TOOL CODE TOOL TYPE
CDR RESISTIVITY
MWD NEUTRON DENSITY
$
TOOL NUMBER
CDR751
ADN045
BOREHOLE AND CASING DATA
OPEN HOLE BIT SIZE (IN):
DRILLERS CASING DEPTH (FT) :
8.500
9460.0
BOREHOLE CONDITIONS
MUD TYPE: LSND
MUD DENSITY (LB/G): 10. 60
MUD VISCOSITY (S) :
MUD PH:
MUD CHLORIDES (PPM) : 23000
FLUID LOSS (C3):
RESISTIVITY (OPL~) AT TEMPERATURE (DEGF) :
MUD AT M~ASURED TEMPERATURE (MT): 2.310
MUD AT MAX CIRCULATIONG TEMPERATURE
MUD FILTRATE AT (MT): 1. 920
MUD CAKE AT (MT):
68.0
68.0
NEUTRON TOOL
MA TRIX: SANDSTONE
MATRIX DENSITY: 2.65
HOLE CORRECTION (IN):
TOOL STANDOFF (IN):
EWR FREQUENCY (HZ):
1.0
REMARKS:
************ 12.25 IN. SURFACE HOLE *************
MWD GR TOOL: MEA BA 246,050
RUN 001 DRILLED INTERVAL :112 FT-6225 FT
RUN 002 DRILLED INTERVAL: 6225 FT-9475'
ALL DATA FROM THE MWD GR IS REAL TIME TRANSMITTED DATA
UNITS FOR MWD GR ARE AAPI
9.625 IN CASING SET AT 9462'
************ 8.5 IN. SURFACE HOLE *************
LWD RUN 001 TOOLS: CDR751 ADN 045 (NSRMAO033
GSR JA2066 )
LIS Tape Verification Listing
Schlumberger Alaska Computing Center
19-JUN-1997 11:51
PAGE
11
BIT TO GR: 71.43 FT. BIT TO RES. 60.43 FT.
BIT TO NEUT: 118.83 FT BIT TO DEN: 114.70 FT.
BIT TO US CAL: 113.41 FT.
DRILLED INTERVAL: 9475 FT - 16750 FT.
GA~ff~A RAY CORRECTED FOR HOLE SIZE AND MUD WEIGHT.
TNPH CORRECTED FOR HOLE SIZE, HYDROGEN INDEX, MUD
SALINITY, AND TEMPERATURE.
ALL DEPTHS ARE FROM DRILLERS PIPE TALLY.
ALL LWD DATA IS PRESENTED FROM DOWNHOLE RECORDED
~ORY.
TOOL CALIBRATION INFORMATION ON TAIL SUMMARY
AT THE END OF 5 IN ~EASURED DEPTH LOG
THIS FILE CONTAIN THE RAW DATA FOR MWD GAF~LA RAY
BIT RUNS 1 AND 2 AND BIT RUN #1 LWD CDR/ADN.
$
LIS FORMAT DATA
** DATA FORMAT SPECIFICATION RECORD **
** SET TYPE - 64EB **
TYPE REPR CODE VALUE
1 66 0
2 66 0
3 73 116
4 66 1
5 66
6 73
7 65
8 68 0.5
9 65 FT
11 66 8
12 68
13 66 0
14 65 FT
15 66 68
16 66 1
0 66 1
** SET TYPE - CHAN **
NAME SERV UNIT SERVICE API API API API FILE NUMB NUMB SIZE REPR PROCESS
ID ORDER # LOG TYPE CLASS MOD NUMB SAMP ELEM CODE (HEX)
DEPT FT 39503 O0 000 O0 0 2 1 1 4 68 0000000000
ATR LW1 0ttMM39503 O0 000 O0 0 2 1 1 4 68 0000000000
PSR LW1 0H~I39503 O0 000 O0 0 2 1 1 4 68 0000000000
ATVRLW1 0HM~139503 O0 000 O0 0 2 1 1 4 68 0000000000
PSVR LW1 OH~ff~39503 O0 000 O0 0 2 1 1 4 68 0000000000
LIS Tape Verifica~io~ Listing
Schlumberger Alaska Computing Center
19-JUN-1997 11:51
PAGE:
12
NAME SERVUNIT SERVICE API API API API FILE NUMB NUMB SIZE REPR PROCESS
ID ORDER # LOG TYPE CLASS MOD NUMB SAMP ELEM CODE (HEX)
DER LW1 0tff4~39503 O0 000 O0 0 2 1 1 4 68 0000000000
ROPE LW1 F/HR 39503 O0 000 O0 0 2 1 1 4 68 0000000000
GR LW1 GAPI 39503 O0 000 O0 0 2 1 1 4 68 0000000000
TABR LW1 39503 O0 000 O0 0 2 1 1 4 68 0000000000
ROMB LW1 G/C3 39503 O0 000 O0 0 2 1 1 4 68 0000000000
ROBB LW1 G/C3 39503 O0 000 O0 0 2 1 1 4 68 0000000000
ROBU LW1 G/C3 39503 O0 000 O0 0 2 1 1 4 68 0000000000
ROBL LW1 G/C3 39503 O0 000 O0 0 2 1 1 4 68 0000000000
ROBR LW1 G/C3 39503 O0 000 O0 0 2 1 1 4 68 0000000000
DRHB LW1 G/C3 39503 O0 000 O0 0 2 1 1 4 68 0000000000
DRHU LW1 G/C3 39503 O0 000 O0 0 2 1 1 4 68 0000000000
DRHL LW1 G/C3 39503 O0 000 O0 0 2 1 1 4 68 0000000000
DRHR LW1 G/C3 39503 O0 000 O0 0 2 1 1 4 68 0000000000
PEB LW1 39503 O0 000 O0 0 2 1 1 4 68 0000000000
PEU LWl 39503 O0 000 O0 0 2 1 1 4 68 0000000000
PEL LW1 39503 O0 000 O0 0 2 1 1 4 68 0000000000
PER LW1 39503 O0 000 O0 0 2 1 1 4 68 0000000000
CALNLW1 IN 39503 O0 000 O0 0 2 1 1 4 68 0000000000
TNPH LW1 PU 39503 O0 000 O0 0 2 1 1 4 68 0000000000
T1VRALW1 39503 O0 000 O0 0 2 1 1 4 68 0000000000
DCALLW1 IN 39503 O0 000 O0 0 2 1 1 4 68 0000000000
HDIA LW1 IN 39503 O0 000 O0 0 2 1 1 4 68 0000000000
VDIA LW1 IN 39503 O0 000 O0 0 2 1 1 4 68 0000000000
RPM LW1 RPM 39503 O0 000 O0 0 2 1 1 4 68 0000000000
** DATA **
DEPT. 16749. 500 ATR. LW1 -999. 250 PSR. LW1 - 999. 250 ATVR. LW1
PSVR.LW1 -999.250 DER.LW1 -999.250 ROPE.LW1 111.103 GR.LW1
TABR.LW1 -999.250 ROPIB.LW1 -999.250 ROBB.LW1 -999.250 ROBU. LW1
ROBL.LW1 -999.250 ROBR.LW1 -999.250 DRHB.LW1 -999.250 DRHU. LW1
DRHL.LW1 -999.250 DRHR.LW1 -999.250 PEB.LW1 -999.250 PEU. LW1
PEL. LW1 -999. 250 PER. LW1 -999. 250 CALN. LW1 -999. 250 TNPH. LW1
TNRA.LW1 -999.250 DCAL.LW1 -999.250 HDIA.LW1 -999.250 VDIA.LW1
RPM. LW1 -999. 250
DEPT. 42. 500 ATR. LW1 -999. 250 PSR. LW1 -999. 250 ATVR. LW1
PSVR.LW1 -999.250 DER.LW1 -999.250 ROPE. LW1 -999.250 GR.LW1
TABR.LW1 -999.250 ROMB.LW1 -999.250 ROBB.LW1 -999.250 ROBU. LW1
ROBL. LW1 -999. 250 ROBR. LW1 -999. 250 DRHB. LW1 -999. 250 DRHU. LW1
DRHL.LW1 -999.250 DRHR.LW1 -999.250 PEB.LW1 -999.250 PEU. LW1
PEL.LW1 -999.250 PER.LW1 -999.250 CALN. LW1 -999.250 TNPH.LW1
TNRA.LW1 -999.250 DCAL.LW1 -999.250 HDIA.LW1 -999.250 VDIA.LW1
RPM. LW1 -999. 250
-999.250
-999.250
-999.250
-999.250
-999.250
-999.250
-999.250
-999 250
19 850
-999 250
-999 250
-999 250
-999 250
-999 250
** END OF DATA **
LIS Tape Verificatio~ Listing
Schlumberger Alaska Computing Center
19-JUN-1997 11:51
PAGE: 13
**** FILE TRAILER ****
FILE NAME : EDIT .002
SERVICE : FLIC
VERSION : O01CO1
DATE . 97/06/19
MAX REC SIZE : 1024
FILE TYPE : LO
LAST FILE :
**** TAPE TRAILER ****
SERVICE NAME : EDIT
DATE : 97/06/19
ORIGIN : FLIC
TAPE NARiE : 97231
CONTINUATION # : 1
PREVIOUS TAPE :
CO~IENT : B.P. EXPLORATION, MILNE POINT MP F-57, API #50-029-22747-00
**** REEL TRAILER ****
SERVICE NAME : EDIT
DATE : 97/06/19
ORIGIN · FLIC
REEL NAME : 97231
CONTINUATION # :
PREVIOUS REEL :
CO~E4ENT · B.P. EXPLORATION, MILNE POINT MP F-57, API #50-029-22747-00