From: Guhl, Meredith D (DOA)
Sent: Monday, November 26, 2018 9:37 AM
To: 'Callahan, Mike S'
Cc: Loepp, Victoria T (DOA); Boyer, David L (DOA)
Subject: KRU 1L-15 L1, L1-01, L1-02 PTDs 216-135, 216-136, 216-138, Permits Expired
Hello Mike,
The following Permits to Drill, issued to ConocoPhillips Alaska, have expired under Regulation 20 AAC 25.005 (g). The
PTDs will be marked expired in the AOGCC database.
• KRU 1L-15 L1, PTD 216-135, Issued 18 November 2016
• KRU 1L-15 L1-01 PTD 216-136, Issued 18 November 2016
• KRU 1L-15 1-1-02, PTD 216-138, Issued 18 November 2016
If you have any questions, please contact me.
Thank you,
Meredith
Meredith Guhl
Petroleum Geology Assistant
Alaska Oil and Gas Conservation Commission
333 W. 7th Ave, Anchorage, AK 99501
meredith.guhl@alaska.gov
Direct: (907) 793-1235
CONFIDENTIALITY NOTICE: This e-mail message, including any attachments, contains information from the Alaska Oil and Gas Conservation
Commission (AOGCC), State of Alaska and is for the sole use of the intended recipient(s). It may contain confidential and/or privileged information.
The unauthorized review, use or disclosure of such information may violate state or federal law. If you are an unintended recipient of this e-mail,
please delete it, without first saving or forwarding it, and, so that the AOGCC is aware of the mistake in sending it to you, contact Meredith Guhl at
907-793-1235 or meredith.guhl@aiaska.gov.
THE STATE
"UAIV Mal
b
GOVERNOR BILL WALKER
Gary Eller
CTD Team Lead
ConocoPhillips Alaska, Inc.
P.O. Box 100360
Anchorage, AK 99510-0360
Alaska a Oil and , d i ..
Conservation Co ' o
333 West Seventh Avenue
Anchorage, Alaska 99501-3572
Main: 907.279.1433
Fax: 907.276.7542
www.aogcc.alaska.gov
Re: Kuparuk River Field, Kuparuk River Oil Pool, KRU 1L-15L1-01
ConocoPhillips Alaska, Inc.
Permit to Drill Number: 216-136
Surface Location: 387' FNL, 143' FEL, SEC. 31, TI 1N, RIOE, UM
Bottomhole Location: 3613' FNL, 2190' FEL, SEC. 31, T11N, RIDE, UM
Dear Mr. Eller:
Enclosed is the approved application for permit to re -drill the above referenced development well.
The permit is for a new wellbore segment of existing well Permit No. 184-183, API No. 50-029-
21204-00-00. Production should continue to be reported as a function of the original API number
stated above.
This permit to drill does not exempt you from obtaining additional permits or an approval required
by law from other governmental agencies and does not authorize conducting drilling operations
until all other required permits and approvals have been issued. In addition, the AOGCC reserves
the right to withdraw the permit in the event it was erroneously issued.
Operations must be conducted in accordance with AS 31.05 and Title 20, Chapter 25 of the Alaska
Administrative Code unless the AOGCC specifically authorizes a variance. Failure to comply
with an applicable provision of AS 31.05, Title 20, Chapter 25 of the Alaska Administrative Code,
or an AOGCC order, or the terms and conditions of this permit may result in the revocation or
suspension of the permit.
Sincerely,
Daniel T. Seamount, Jr.
Commissioner
DATED this day of November, 2016.
RECEIVED
STATE OF ALASKA
ALASKA OIL AND GAS CONSERVATION COMMISSION
PERMIT TO DRILL
20 AAC 25.005
O C 1 2 7 2016
.AOGCC CD 3
1 a. Type of Work:
1 b. Proposed Well Class: Exploratory - Gas ❑ Service - WAG ❑ Service - Disp
1 c. Specify if well is proposed for:
Drill [_1' Lateral Q
Stratigraphic Test ❑ Development - Oil - Service - Winj ❑ Single Zone 8
Coalbed Gas ❑ Gas Hydrates ❑
Redrill ❑ Reentry ❑
Exploratory - Oil ❑ Development - Gas ❑ Service - Supply ❑ Multiple Zone
Geothermal ❑ Shale Gas ❑
2. Operator Name:
5. Bond: Blanket Q . Single Well ❑
11. Well Name and Number:
ConocoPhillips Alaska Inc
Bond No. 5952180 .
IX_ 1 L-15L1-01
3. Address:
6. Proposed Depth:
12. Field/Pool(s):
P.O. Box 100360 Anchorage, AK 99510-0360
MD: 9300' TVD 6001'
Kuparuk River Field /
4a. Location of Well (Governmental Section):
7. Property Designation (Lease Number):
Surface: 387' FNL, 143' FEL, Sec 31, T11N, R10E, UM -
ADL 25659,
Kuparuk Oil Pool
Top of Productive Horizon:
8. Land Use Permit:
13. Approximate Spud Date:
1214' FNL, 11 13'FEL, Sec 31, T11N, R10E, UM
ALK 2585
11/4/2016
Total Depth:
9. Acres in Property:
14. Distance to Nearest Property:
3613' FNL, 2190' FEL, Sec 31, T11N, R10E, UM
2490
14350'
4b. Location of Well (State Base Plane Coordinates - NAD 27):
10. KB Elevation above MSL (ft): 118'
15. Distance to Nearest Well Open
Surface: x- 539923 y- 5949191 Zone- 4
GL Elevation above MSL (ft): 8% r 301
to Same Pool: 124' (1 L-13)
16. Deviated wells: Kickoff depth: 6540 feet '
17. Maximum Potential Pressures in psig (see 20 AAC 25.035)
Maximum Hole Angle: 95 degrees -
Downhole: 3702 Surface: 3114
18. Casing Program:
Specifications
Top - Setting Depth - Bottom
Cement Quantity, c.f. or sacks
Hole
Casing
Weight
Grade
Coupling
Length
MD
TVD
MD
TVD
(including stage data)
3"
2-3/8"
4.7#
L-80
ST-L
2920'
6380'
5912'
9300'
6001'
N/A
19. PRESENT WELL CONDITION SUMMARY (To be completed for Redrill and Re -Entry Operations)
Total Depth MD (ft):
Total Depth TVD (ft):
Plugs (measured):
Effect. Depth MD (ft):
Effect. Depth TVD (ft):
Junk (measured):
6705'
6266'
N/A
6704'
6265'
Fish - 6480'
Casing
Length
Size
Cement Volume
MD
TVD
Conductor/Structural
102'
16"
214 sx Cold Set II
102'
102'
Surface
3475'
9-5/8"
1025 sx AS 111 & 700 sx Class G
3475'
3475'
Intermediate
Production
6704'
1 7"
275 sx Class G & 250 sx AS 1
6704
16265'
Liner
Perforation Depth MD (ft): 6235- 6268'
Perforation Depth TVD (ft): 5923' - 5949'
6393' - 6416'
6044' - 6061'
20. Attachments: Property Plat ❑ BOP Sketch ❑ Drilling Program 0 Time v. Depth Plot ❑ Shallow Hazard Analysis❑
Diverter Sketch ❑ Seabed Report ❑ Drilling Fluid Program Q 20 AAC 25.050 requirements0
21. Verbal Approval: Commission Representative: Date
22. 1 hereby certify that the foregoing is true and the procedure approved herein will not Mike Callahan 263-4180
Contact A111
be deviated from without prior written approval.
Email mike.callahan(cDcop.com
Printed Name Gary Eller Title CTD Team Lead
Signature Phone Zb - 2- Date \ Zb
Commission Use Only
Permit to Drill
API Number:
Permit Approval
See cover letter for other
Number: ' I -
50- - a0�-( QO
Date: /I— 1'i6 -I Le
requirements.
Conditions of approval : If box is checked, well may not be used to explore for, test, or produce coalbed methanF, gas hydrates, or gas contained in shales:
Other: 3 5�;� ��� �� ke--_ f Samples req'd: Yes ❑ No[�/J Mud log req'd: Yes Q No[�
�/ HZS measures: Yes LrC1J No Directional svy req'd: Yes Lrl�Jt No
L Spacing exception req'd: Yes ❑ No Inclination -only svy req'd: Yes❑ Noy
/
lC -� {/ n� , h�- �/to, 4� Post initial injection MIT req'd: Yes❑ No❑
APPROVED BY //
Approved by: COMMISSIONER THE COMMISSION Date: all! S'1
4,6
Form 10-401 (Revised 11/2015)
ORIGINAL
Submit Form and
This permit is val'd for 24 months from the date of approval (20 AAC 25.005(g)) Attachments in Duplicate
r
ConocoPhillips
p
Alaska
P.O. BOX 100360
ANCHORAGE, ALASKA 99510-0360
October 26, 2016
Commissioner - State of Alaska
Alaska Oil & Gas Conservation Commission
333 West 7th Avenue Suite 100
Anchorage, Alaska 99501
Dear Commissioner:
ConocoPhillips Alaska, Inc. hereby submits applications for permits to drill 3 laterals out of the Kuparuk Well 1 L-
15 using the coiled tubing drilling rig, Nabors CDR3-AC.
To account for geological uncertainties, ConocoPhillips requests a variance from the requirements of 20 AAC
25.015 to allow the actual kick-off point to be anywhere along the length of the parent lateral instead of being
limited to 500' from the original point.
Attached to this application are the following documents:
10-401 Applications for 1L-151-1, 1L-151-1-01, and 1L-15L1-02
Detailed Summary of Operations
Directional Plans for 1L-15L1, 1L-151-1-01, and 1L-15L1-02
Proposed CTD Schematic
If you have any questions or require additional information, please contact me at 907-263-4180.
Sincerely,
A �
Mike Callahan
ConocoPhillips Alaska
Coiled Tubing Drilling Engineer
Kuparuk CTD Laterals NABORS ALASKA
1 L-15L1, 1 L-15L1-01 & 1 L-15L1-02 G13�
Application for Permit to Drill Document 2RC
1.
Well Name and Classification...........................................................................................................2
(Requirements of 20 AAC 25.005(o and 20 AAC 25.005(b))......................................................................................................................2
2.
Location Summary.............................................................................................................................2
(Requirements of 20 AAC 25.005(c)(2)).............................................................................................................................. .....................2
3.
Blowout Prevention Equipment Information...................................................................................2
(Requirements of 20 AAC 25.005 (c)(3)).....................................................................................................................................................2
4.
Drilling Hazards Information and Reservoir Pressure....................................................................2
(Requirements of 20 AAC 25.005(c)(4)).....................................................................................................................................................2
5.
Procedure for Conducting Formation Integrity tests.....................................................................2
(Requirements of 20 AAC 25.005(c)(5))......................................................................................................................................................2
6.
Casing and Cementing Program......................................................................................................3
(Requirements of 20 AAC 25.005(c)(6))......................................................................................................................................................3
7.
Diverter System Information.............................................................................................................3
(Requirements of 20 AAC 25.005(c)(7))......................................................................................................................................................3
8.
Drilling Fluids Program.....................................................................................................................3
(Requirements of 20 AAC 25.005(c)(8))......................................................................................................................................................3
9.
Abnormally Pressured Formation Information...............................................................................4
(Requirements of 20 AAC 25.005(c)(9))......................................................................................................................................................4
10.
Seismic Analysis.................................................................................................................................4
(Requirements of 20 AAC 25.005(c)(10))....................................................................................................................................................4
11.
Seabed Condition Analysis...............................................................................................................4
(Requirements of 20 AAC 25.005(c)(11))....................................................................................................................................................4
12.
Evidence of Bonding.........................................................................................................................4
(Requirements of 20 AAC 25.005(c)(12))....................................................................................................................................................4
13.
Proposed Drilling Program...............................................................................................................4
(Requirements of 20 AAC 25.005(c)(13))....................................................................................................................................................4
Summaryof Operations.................................................................................................................................................. 4
LinerRunning.................................................................................................................................................................. 6
14.
Disposal of Drilling Mud and Cuttings.............................................................................................6
(Requirements of 20 AAC 25.005(c)(14))................................................................................................................................................. 6
15.
Directional Plans for Intentionally Deviated Wells..........................................................................6
(Requirements of 20 AAC 25.050(b)).......................................................................................................................................................... 6
16. Attachments.......................................................................................................................................6
Attachment 1: Directional Plans for 1L-15L1, 1L-15L1-01 & 1L-15L1-02 laterals........................................................... 6
Attachment 2: Current Well Schematic for 1 L-15........................................................................................................... 6
Attachment 3: Proposed Well Schematic for 1 L-15L1, 1 L-15L1-01 & 1 L-15L1-02 laterals ............................................. 6
Page 1 of 6 October 26, 2016
PTD Application: 1 L-151-1, 1 L-151-1-01 & 1 L-151-1-02
1. Well Name and Classification
(Requirements of 20 AAC 25.005(f) and 20 AAC 25.005(b))
The proposed laterals described in this document are 11--151-1, 1L-15L1-01 & 1L-15L1-02. All laterals will be
classified as producer wells.
2. Location Summary
(Requirements of 20 AAC 25.005(c)(2))
These laterals will target the A sand package in the Kuparuk reservoir. See attached 10-401 form for surface
and subsurface coordinates of the 1 L-151-1, 1 L-151-1-01 & 1 L-151-1-02.
3. Blowout Prevention Equipment Information
(Requirements of 20 AAC 25.005 (c)(3))
Please reference blowout prevention (BOP) schematics on file with the Commission for Nabors CDR3-AC.
BOP equipment is as required per 20 AAC 25.036 for thru-tubing drilling operations.
— Pipe rams, blind rams and the CT pack off will be pressure tested to 250 psi and to 3,500 psi. Using the
maximum formation pressure in the area of 3702 psi in 1 L-16 (i.e. 12.1 ppg EMW), the maximum
potential surface pressure in 1 L-15, assuming a gas gradient of 0.1 psi/ft, would be 3102 psi. See the
"Drilling Hazards Information and Reservoir Pressure" section for more details.
— The annular preventer will be tested to 250 psi and 2,500 psi.
4. Drilling Hazards Information and Reservoir Pressure
(Requirements of 20 AAC 25.005 (c)(4))
Reservoir Pressure and Maximum Downhole Pressure (Requirements of 20 AAC 25.005 (c)(4)(a))
The formation pressure in KRU 1 L-15 was measured to be 2962 psi (9.5 ppg EMW) on 4/24/2015. The
maximum downhole pressure in the 1 L-15 vicinity is to the south in the 1 L-16 injector at 3702 psi (12.1 ppg
EMW) from May of 2014. The 1L-151-1-01 sidetrack will be drilled south and could encounter formation
pressure from 1 L-16.
Potential Gas Zones (Requirements of 20 AAC 25.005 (c)(4)(b))
Wells on 1 L pad have injected gas, so there is a chance of encountering free gas while drilling the 1 L-15
laterals. If significant gas is detected in the returns the contaminated mud can be diverted to a storage tank
away from the rig.
Potential Causes of Hole Problems (Requirements of 20 AAC 25.005 (c)(4)(c))
The major expected risk of hole problems in the 1 L-15 laterals will be shale instability across faults. Managed
pressure drilling (MPD) will be used to reduce the risk of shale instability associated with fault crossings.
5. Procedure for Conducting Formation Integrity tests
(Requirements of 20 AAC 25.005(c)(5))
The 1 L-15 laterals will be drilled under 20 AAC 25.036 for thru-tubing drilling operations so a formation integrity
test is not required.
Page 2 of 6 October 26, 2016
PTD Application: 1 L-151-1, 1 L-151-1-01 & 1 L-151_1-02
6. Casing and Cementing Program
(Requirements of 20 AAC 25.005(c)(6))
New Completion Details
Lateral (dame
Liner Top
Liner Btm
Liner Top
Liner Btm
Liner Details
MD
MD
TVDSS
TVDSS
1 L-15L1
6540'
10200'
5940'
5995'
2-3/8", 4.7#, L-80, ST-L slotted liner;
aluminum billet on top
1L-15L1-01
6380,
9300'
5912'
6001'
2-3/8", 4.7#, L-80, ST-L slotted liner;
aluminum billet on to
1 L-15L1-02
6325'
10200'
5879'
5933'
2-3/8", 4.7#, L-80, ST-L slotted liner;
de to ment sleeve on to
Existing Casing/Liner Information
Category
OD
Weight
(ppf)
Grade
Connection
Top MD
Btm MD
Top
TVD
Btm
TVD
Burst
psi
Collapse
psi
Conductor
16"
62.5
H-40
Welded
0'
102'
0'
102'
1640
670
Surface
9-5/8"
36.0
J-55
BTC
0'
3475'
0'
3475'
3520
2220
Production
7"
26.0
J-55
BTC
0'
6704'
0'
6265'
4980
4320
Tubing
3-1/2"
9.3
L-80
EUE-8RD
0
6345
0
6008'
10160
10530
7. Diverter System Information
(Requirements of 20 AAC 25.005(c)(7))
Nabors CDR3-AC will be operating under 20 AAC 25.036, for thru-tubing drilling operations. Therefore, a
diverter system is not required.
8. Drilling Fluids Program
(Requirements of 20 AAC 25.005(c)(8))
Diagram of Drilling System
A diagram of the Nabors CDR3-AC mud system is on file with the Commission.
Description of Drilling Fluid System
— Window milling operations: Water -based Power-vis milling fluid (8.6 ppg)
— Drilling operations: Water -based Flo -Pro drilling mud (8.6 ppg). This mud weight will not
hydrostatically overbalance the reservoir pressure, overbalanced conditions will be maintained using
MPD practices described below.
— Completion operations: The well will be loaded with 11.8 ppg potassium formate completion fluid in
order to provide formation over -balance and well bore stability while running completions. If higher
pressure is encountered, potassium formate will be used to provide over -balance.
Managed Pressure Drilling Practice
Managed pressure drilling (MPD) techniques will be employed to maintain a constant overbalanced pressure on
the open hole formation and promote wellbore stability throughout the coiled tubing drilling (CTD) process. Mud
weight is not, in many cases, the primary well control barrier. This is satisfied with the 5,000 psi rated coiled
tubing pack off and MPD choke. BOPE equipment provides the secondary well control as detailed in section 3
"Blowout Prevention Equipment Information".
In the 1 L-15 laterals we will target a constant BHP of 11.8 ppg EMW at the window. The constant BHP target will
be adjusted through choke pressure and/or mud weight increases to maintain overbalanced conditions if
increased reservoir pressure is encountered. Additional choke pressure or increased mud weight may also be
employed for improved borehole stability. Any change of circulating friction pressure due to change in pump rates
or change in depth of circulation will be offset with back pressure adjustments.
Page 3 of 6 October 26, 2016
PTD Application: 1 L-15L1, 1 L-151-1-01 & 1 L-151-1-02
Pressure at the 1 L-15 Window (6330' MD, 6001' TVD) Using MPD
Pumps On 1.5 b m
Pumps Off
A -sand Formation Pressure 9.5 )
2965 psi
2965 psi
Mud Hydrostatic 8.6
2684 psi
2684 psi
Annular friction i.e. ECD, 0.090 si/ft
570 psi
0 psi
Mud + ECD Combined
(no choke pressure)
3254 psi
2684 psi
underbalanced —281psi)
Target BHP at Window (11.8 pp)
3683 psi
3683 psi
Choke Pressure Required to Maintain
Target BHP
429 psi
999 psi
9. Abnormally Pressured Formation Information
(Requirements of 20 AAC 25.005(c)(9))
N/A - Application is not for an exploratory or stratigraphic test well.
10. Seismic Analysis
(Requirements of 20 AAC 25.005(c)(10))
N/A - Application is not for an exploratory or stratigraphic test well.
11. Seabed Condition Analysis
(Requirements of 20 AAC 25.005(c)(11))
N/A - Application is for a land based well.
12. Evidence of Bonding
(Requirements of 20 AAC 25.005(c)(12))
Evidence of bonding for ConocoPhillips Alaska, Inc. is on file with the Commission.
13. Proposed Drilling Program
(Requirements of 20 AAC 25.005(c)(13))
Summary of Operations
Background
KRU well 1L-15 is a Kuparuk A Sand producer equipped with 3-1/2" tubing and 7" production casing. The
CTD sidetrack will utilize three laterals to target the A4/A5 Sands to north and A5 Sand to the south of 1L-
15.
A rig workover was performed to install anew upper completion with a tandem wedge assembly. Prior to
CTD operation, an inner wedge will be set at 6330' MD.
Nabors CDR3-AC will kick-off at 6330' MD. All three laterals will be completed with 2-3/8" slotted liner
from TD with the last lateral liner top located inside the tubing tail.
The 1L-15L1 northern lateral will exit the big tail pipe at 6330' MD and TD at 10200' MD, targeting the
A4 and A5 sands. It will be completed with 2-3/8" slotted liner from TD up to 6540'MD with an aluminum
billet for kicking off the 1 L-15L 1-01.
The 1L-15L1-01 lateral will drill to the south to a TD of 9300' MD targeting the A5 sand. It will be
completed with 2-3/8" slotted liner frorn TLS up to 6380' MD with an aluminum billet for kicking off the
1L-15L1-02.
Page 4 of 6 October 26, 2016
PTD Application: 1 L-15L1, 1 L-151_1-01 & 1 L-15L1-02
The 1L-15L1-02 lateral will drill to the north to a TD of 10,200' MD targeting the A4 and A5 sands. It will
be completed with slotted liner from TD to 6325' MD in the tubing tail with a deployment sleeve.
Pre-CTD Work
1. RU Slickline: Obtain SBHP
2. RU E-line: Set inner wedge at 6330' MD.
3. Prep site for Nabors CDR3-AC and set BPV.
Ric Work
1. MIRU Nabors CDR3-AC rig using 2" coil tubing. NU 7-1/16" BOPE, test.
2. 1L-15L1 Sidetrack (A4/A5 sand - North)
i. Mill 2.80" window at 6330' MD.
ii. Drill 3" bi-center lateral to TD of 10200' MD.
iii. Run 2%" slotted liner with an aluminum billet from TD up to 6540' MD.
3. 1L-15L1-01 Lateral (A5 sand - South) ✓
i. Kick off of the aluminum billet at 6540' MD.
ii. Drill 3" bi-center lateral to TD of 9300' MD.
iii. Run 2%" slotted liner with aluminum billet from TD up to 6380' MD.
4. 1L-15L1-02 Lateral (A4/A5 sand - North)
i. Kickoff of the aluminum billet at 6380' MD.
ii. Drill 3" bi-center lateral to TD of 10200' MD.
iii. Run 2%" slotted liner with deployment sleeve from TD up to 6325' MD.
5. Freeze protect, set BPV, ND BOPE, and RDMO Nabors CRD3-AC.
Post -Rig Work
1. Pull BPV
2. Obtain SBHP
3. Install gas lift design
4. Put on production
Pressure Deployment of BHA
The planned bottom hole assemblies (BHAs) are too long to simply isolate by closing the double swab valves on
the Christmas tree. MPD operations require the BHA to be lubricated under pressure using a system of double
swab valves on the Christmas tree, double deployment rams, double check valves and double ball valves in the
BHA, and a slick -line lubricator can be used. This pressure control equipment listed ensures there are always two
barriers to reservoir pressure, both internal and external to the BHA, during the deployment process.
During BHA deployment, the following steps are observed.
— Initially the double swab valves on the tree are closed to isolate reservoir pressure. The lubricator is
installed on the BOP riser with the BHA inside the lubricator.
— Pressure is applied to the lubricator to equalize across the swab valves. The swab valves are opened and
the BHA is lowered in place via slick -line.
— When the BHA is spaced out properly, the double deployment rams are closed on the BHA to isolate
reservoir pressure via the annulus. A closed set of double ball valves and double check valves isolate
Page 5 of 6 October 26, 2016
PTD Application: 1 L-15L1, 1 L-151-1-01 & 1 L-151-1-02
reservoir pressure internal to the BHA. Slips on the double deployment rams prevent the BHA from
moving when differential pressure is applied. The lubricator is removed once pressure is bled off above
the deployment rams.
— The coiled tubing is made up to the BHA with the double ball valves plus the double check valves in the
closed position. Pressure is applied to the coiled tubing to equalize internal pressure and then the
double ball valves are opened. The injector head is made up to the riser, annular pressure is equalized,
and the deployment rams are opened. The BHA and coiled tubing are now ready to run in the hole.
During BHA undeployment, the steps listed above are observed, only in reverse.
Liner Running
— The 1 L-15 laterals will be displaced to an overbalanced fluid (11.8 ppg potassium formate) prior to
running liner. See "Drilling Fluids" section for more details.
— While running 2-3/8" slotted liner, a joint of 2-3/8" non -slotted tubing will be standing by for
emergency deployment. A floor valve is made up onto this joint ahead of time, and the rig crew
conducts a deployment drill with this emergency joint on every slotted liner run. The 2-3/8" rams will
provide secondary well control while running 2-3/8" liner.
14. Disposal of Drilling Mud and Cuttings
(Requirements of 20 AAC 25.005(c)(14))
• No annular injection on this well.
• All solid waste will be transported to the grind and inject facility at DS-4 Prudhoe Bay for disposal.
• Incidental fluids generated from drilling operations will be injected in a Kuparuk Class II disposal well (1 R-18
or 1 B disposal facilities) or Prudhoe DS-4 if a Kuparuk facility is unavailable.
• All wastes and waste fluids hauled from the pad must be properly documented and manifested.
• Contact Kuparuk Environmental Coordinator for questions regarding waste classification. (670-4200).
15. Directional Plans for Intentionally Deviated Wells
(Requirements of 20 AAC 25.050(b))
— The Applicant is the only affected owner.
— Please see Attachment 1: Directional Plans
— Magnetic and inclination surveys will be taken every 30 ft. No gyro will be run.
— MWD directional, resistivity, and gamma ray will be run over the entire open hole section. ✓
— Distance to Nearest Property Line (measured to KPA boundary at closest point)
Lateral Name
Distance
1 L-15L1
16000,
1 L-151-1-01
14350'
1 L-151_1-02
16000'
— Distance to Nearest Well within Pool
Lateral Name
Distance
Well
1 L-15L1
167'
1 L-02
1 L-15L1-01
124'
1 L-13
1 L-15L1-02
136'
1 L-02
16.Attachments
Attachment 1: Directional Plans for IL-15L1, 1L-15L1-01 & IL-15L1-02laterals
Attachment 2: Current Well Schematic for 1L-15
Attachment 3: Proposed Well Schematic for IL-15L1, 1L-15L1-01 & IL-15L1-02laterals
Page 6 of 6 October 26, 2016
ConocoPh i I I i ps
ConocoPhillips (Alaska) Inc. -Kup2
Kuparuk River Unit
Kuparuk 1L Pad
1 L-15
1 L-15L1
Plan: 1 L-15L1 wp02
Standard Planning Report
25 October, 2016
F i - I
CA I'l
BAKER
HUGHES
ConocoPhillips
Database:
EDM Alaska NSK Sandbox
Company:
ConocoPhillips (Alaska) Inc. -Kup2
Project:
Kuparuk River Unit
Site:
Kuparuk 1 L Pad
Well:
1L-15
Wellbore:
1 L-1511
Design:
1 L-15L1_wp02
ConocoPhillips
Planning Report
Local Co-ordinate Reference:
Well 1L-15
TVD Reference:
Mean Sea Level
MD Reference:
1L-15 @ 118.00usft (Parker 141)
North Reference:
True
Survey Calculation Method:
Minimum Curvature
Project Kuparuk River Unit, North Slope Alaska, United States
Map System: US State Plane 1927 (Exact solution) System Datum: Mean Sea Level
Geo Datum: NAD 1927 (NADCON CONUS) Using Well Reference Point
Map Zone: Alaska Zone 04 Using geodetic scale factor
ri.l
BAKER
HUGHES
Site Kuparuk 1 L Pad
Site Position: Northing: 5,949,190.90 usft Latitude: 70' 16' 19,650 N
From: Map Easting: 539,916.78usft Longitude: 149' 40' 37.763 W
Position Uncertainty: 0.00 usft Slot Radius: 0.000 in Grid Convergence: 0.30 °
Well 1L-15
Well Position +N/-S 0.00 usft Northing: 5,948,581.09 usft Latitude: 70' 16' 13.652 N
+E/-W 0.00 usft Easting: 539,922.94 usft Longitude: 149' 40' 37.678 W
Position Uncertainty 0.00 usft Wellhead Elevation: usft Ground Level: 83.20 usft
Wellbore 1L-151_1
Magnetics Model Name Sample Date Declination Dip Angle Field Strength
C) C) (nT)
B G G M 2016 12/ 1 /2016 17.86 80.91 57,543
Design 1L-151_1_wp02
Audit Notes:
Version: Phase: PLAN Tie On Depth: 6,300.00
Vertical Section: Depth From (TVD) +N/-S +E/-W Direction
(usft) (usft) (usft) V)
-83.20 0.00 0.00 0.00
1012512016 12:12:56PM Page 2 COMPASS 5000.1 Build 74
i
ConocoPhillips Opal
ConocoPhillips Planning Report BAKER
HUGHES
Database:
EDM Alaska NSK Sandbox
Local Co-ordinate Reference:
Well 1 L-15
Company:
ConocoPhillips (Alaska) Inc. -Kup2
TVD Reference:
Mean Sea Level
Project:
Kuparuk River Unit
MD Reference:
1 L-15 @ 118.00usft (Parker 141)
Site:
Kuparuk I Pad
North Reference:
True
Well:
1L-15
Survey Calculation Method:
Minimum Curvature
Wellbore:
1 L-15L1
Design:
1 L-15L1_wp02
Plan Sections
Measured
TVD Below
Dogleg
Build
Turn
Depth
Inclination
Azimuth
System
+N/-S
+E/-W
Rate
Rate
Rate
TFO
(usft)
(°)
(°)
(usft)
(usft)
(usft)
(°/100ft)
(°/100ft)
(°/100ft)
(°) Target
6,300.00
39.67
232.80
5,855.75
-792.86
-922.58
0.00
0.00
0.00
0.00
6,330.00
40.41
232.71
5,878.72
-804.54
-937.94
2.47
2.47
-0.30
-4.51
6,351.00
44.61
232.71
5,894.20
-813.13
-949.23
20.00
20.00
0.00
0.00
6,464.48
90.00
232.71
5,936.84
-874.91
-1,030.35
40.00
40.00
0.00
0.00
6,634.48
91.85
300.70
5,933.71
-884.15
-1,190.25
40.00
1.09
39.99
88.00
6,710.00
92.31
305.97
5,930.97
-842.69
-1,253.29
7.00
0.60
6.98
85.00
6,785.00
92.30
311.22
5,927.96
-795.96
-1,311.84
7.00
-0.01
7.01
90.00
6,860.00
89.67
315.77
5,926.67
-744.36
-1,366.22
7.00
-3.51
6.06
120.00
6,985.00
85.31
323.36
5,932.16
-649.41
-1,447.14
7.00
-3.49
6.08
120.00
7,110.00
89.71
330.93
5,937.59
-544.60
-1,514.81
7.00
3.52
6.06
60.00
7,210.00
95.44
334.96
5,933.10
-455.69
-1,560.22
7.00
5.73
4.03
35.00
7,310.00
93.02
341.55
5,925.72
-363.11
-1,597.14
7.00
-2.42
6.59
110.00
7,410.00
92.02
348.48
5,921.32
-266.67
-1,622.96
7.00
-0.99
6.94
98.00
7,570.00
91.98
359.69
5,915.70
-107.87
-1,639.41
7.00
-0.02
7.00
90.00
7,900.00
89.87
22.70
5,910.30
213.62
-1,575.78
7.00
-0.64
6.97
95.00
8,160.00
88.31
40.83
5,914.47
433.73
-1,439.51
7.00
-0.60
6.98
95.00
8,260.00
88.33
33.83
5,917.40
513.16
-1,378.93
7.00
0.01
-7.00
-90.00
8,560.00
88.44
12.82
5,925.97
786.99
-1,260.86
7.00
0.04
-7.00
-90.00
8,635.00
83.51
11.02
5,931.24
860.16
-1,245.41
7.00
-6.58
-2.41
-160.00
8,710.00
88.06
8.39
5,936.75
933.87
-1,232.82
7.00
6.07
-3.50
-30.00
8,825.00
90.15
0.62
5,938.55
1,048.40
-1,223.79
7.00
1.82
-6.76
-75.00
8,975.00
89.24
11.08
5,939.35
1,197.41
-1,208.53
7.00
-0.61
6.97
95.00
9,100.00
86.27
2.84
5,944.26
1,321.27
-1,193.40
7.00
-2.38
-6.59
-110.00
9,225.00
86.31
11.61
5,952.37
1,444.90
-1,177.73
7.00
0.03
7.01
90.00
9,375.00
77.74
5.47
5,973.18
1,591.58
-1,155.61
7.00
-5.71
-4.09
-145.00
9,525.00
88.24
5.47
5,991.45
1,739.57
-1,141.44
7.00
7.00
0.00
0.00
9,705.00
95.46
15.81
5,985.62
1,916.03
-1,108.32
7.00
4.01
5.75
55.00
9,855.00
90.16
6.73
5,978.24
2,062.76
-1,079.11
7.00
-3.53
-6.05
-120.00
9,955.00
86.67
12.80
5,981.01
2,161.22
-1,062.17
7.00
-3.49
6.07
120.00
10,200.00
86.82
355.62
5,995.03
2,404.24
-1,044.28
7.00
0.06
-7.01
-90.00
1012512016 12:12:56PM Page 3 COMPASS 5000.1 Build 74
ConocoPhillips ,el a.
ConocoPhillips Planning Report BAKER
HUGHES
Database:
EDM Alaska NSK Sandbox
Local Co-ordinate Reference:
Well 1 L-15
Company:
ConocoPhillips (Alaska) Inc. -Kup2
TVD Reference:
Mean Sea Level
Project:
Kuparuk River Unit
MD Reference:
1L-15 @ 118.00usft (Parker 141)
Site:
Kuparuk 1 L Pad
North Reference:
True
Well:
1 L-15
Survey Calculation Method:
Minimum Curvature
Wellbore:
1 L-15L1
Design:
1 L-15L1 _wp02
Planned Survey
Measured
TVD Below
Vertical
Dogleg
Toolface
Map
Map
Depth
Inclination
Azimuth
System
+N/-S
+E/-W
Section
Rate
Azimuth
Northing
Easting
(usft)
(°)
(°)
(usft)
(usft)
(usft)
(usft)
(°/100ft)
(°)
(usft)
(usft)
6,300.00
39.67
232.80
5,855.75
-792.86
-922.58
-792.86
0.00
0.00
5,947,783.43
539,004.67
TIP
6,330.00
40.41
232.71
5,878.72
-804.54
-937.94
-804.54
2.47
-4.51
5,947,771.67
538,989.37
KOP
6,351.00
44.61
232.71
5,894.20
-813.13
-949.23
-813.13
20.00
0.00
5,947,763.02
538,978.13
End 20
dls, Start 40 dls
6,464.48
90.00
232.71
5,936.84
-874.91
-1,030.35
-874.91
40.00
0.00
5,947,700.81
538,897.34
4
6,634.48
91.85
300.70
5,933.71
-884.15
-1,190.25
-884.15
40.00
88.00
5,947,690.73
538,737.51
End 40
dls, Start 7 dls
6,710.00
92.31
305.97
5,930.97
-842.69
-1,253.29
-842.69
7.00
85.00
5,947,731.84
538,674.26
6
6,785.00
92.30
311.22
5,927.96
-795.96
-1,311.84
-795.96
7.00
90.00
5,947,778.26
538,615.47
7
6,860.00
89.67
315.77
5,926.67
-744.36
-1,366.22
-744.36
7.00
120.00
5.947,829.56
538,560.83
8
6,985.00
85.31
323.36
5,932.16
-649.41
-1,447.14
-649.41
7.00
120.00
5,947,924.07
538,479.41
9
7,110.00
89.71
330.93
5,937.59
-544.60
-1,514.81
-544.60
7.00
60.00
5,948,028.52
538,411.19
10
7,210.00
95.44
334.96
5,933.10
-455.69
-1,560.22
-455.69
7.00
35.00
5,948,117.18
538,365.31
11
7,310.00
93.02
341.55
5.925.72
-363.11
-1,597.14
-363.11
7.00
110.00
5,948,209.55
538,327.91
12
7,410.00
92.02
348.48
5,921.32
-266.67
-1.622.96
-266.67
7.00
98.00
5,948,305.85
538,301.58
13
7,570.00
91.98
359.69
5,915.70
-107.87
-1,639.41
-107.87
7.00
90.00
5,948,464.54
538,284.29
14
7,900.00
89.87
22.70
5,910.30
213.62
-1,575.78
213.62
7.00
95.00
5,948,786.33
538,346.21
15
8,160.00
88.31
40.83
5,914.47
433.73
-1,439.51
433.73
7.00
95.00
5,949,007.13
538,481.29
16
8,260.00
88.33
33.83
5,917.40
513.16
-1,378.93
513.16
7.00
-90.00
5,949,086.88
538,541.44
17
8,560.00
88.44
12.82
5,925.97
786.99
-1,260.86
786.99
7.00
-90.00
5,949,361.30
538,658.04
18
8,635.00
83.51
11.02
5,931.24
860.16
-1,245.41
860.16
7.00
-160.00
5,949,434.55
538,673.10
19
8,710,00
88.06
8,39
5.936.75
933.87
-1,232.82
933.87
7.00
-30.00
5,949,508.31
538,685.31
20
8,825.00
90.15
0.62
5,938.55
1,048.40
-1,223.79
1,048.40
7.00
-75.00
5,949,622.88
538,693.72
21
8,975.00
89.24
11.08
5,939.35
1,197.41
-1,208.53
1,197.41
7.00
95.00
5,949,771.96
538,708.19
22
9,100.00
86.27
2.84
5,944.26
1.321.27
-1,193.40
1,321.27
7.00
-110.00
5,949,895.88
538,722.66
23
9,225.00
86.31
11.61
5,952.37
1,444.90
-1,177.73
1,444.90
7.00
90.00
5,950,019.58
538,737.68
24
9,375.00
77.74
5.47
5,973.18
1,591.58
-1,155.61
1,591.58
7.00
-145.00
5,950,166.36
538,759.01
25
9,525.00
88.24
5.47
5,991.45
1,739.57
-1,141.44
1,739.57
7.00
0.00
5,950,314.41
538,772A0
1012512016 12:12:56PM Page 4 COMPASS 5000.1 Build 74
�- ConocoPhillips War FAI
ConocoPhillips Planning Report BAKER
HUGHES
Database:
EDM Alaska NSK Sandbox
Company:
ConocoPhillips (Alaska) Inc. -Kup2
Project:
Kuparuk River Unit
Site:
Kuparuk 1 L Pad
Well:
1L-15
Wellbore:
1 L-151-1
Design:
1 L-151-1_wp02
Local Co-ordinate Reference:
TVD Reference:
MD Reference:
North Reference:
Survey Calculation Method:
Well 1 L-15
Mean Sea Level
1L-15 @ 118.00usft (Parker 141)
True
Minimum Curvature
Planned Survey
Measured
TVD Below
Vertical
Dogleg
Toolface
Map
Map
Depth
Inclination
Azimuth
System
+N/-S
+E/-W
Section
Rate
Azimuth
Northing
Easting
(usft)
(a)
(o)
(usft)
(usft)
(usft)
(usft)
(°llooft)
(1)
(usft)
(usft)
26
9,705.00
95.46
15.81
5,985.62
1,916.03
-1,108.32
1,916.03
7.00
55.00
5,950,491.03
538,804.58
27
9,855.00
90.16
6,73
5,978.24
2,062.76
-1,079.11
2,062.76
7.00
-120.00
5,950,637.90
538,833.01
28
9.955.00
86.67
12.80
5,981.01
2,161.22
-1,062.17
2,161.22
7.00
120.00
5,950,736.43
538,849.43
29
10,200.00
86.82
355.62
5,995.03
2,404.24
-1,044.28
2,404.24
7.00
-90.00
5,950,979.52
538,866.03
Planned TD at 10200.00
1012512016 12:12:56PM Page 5 COMPASS 5000.1 Build 74
ConocoPhillips HAR.
ConocoPhillips Planning Report BAKER
HUGHES
Database:
EDM Alaska NSK Sandbox
Company:
ConocoPhillips (Alaska) Inc. -Kup2
Project:
Kuparuk River Unit
Site:
Kuparuk I Pad
Well:
1L-15
Wellbore:
1 L-151-1
Design:
1 L-15L1_wp02
Targets
Local Co-ordinate Reference:
TVD Reference:
MD Reference:
North Reference:
Survey Calculation Method:
Well 1L-15
Mean Sea Level
1 L-15 @ 118.00usft (Parker 141)
True
Minimum Curvature
Target Name
hit/miss target Dip Angle Dip Dir. TVD +N/-5 +E/-W Northing Easting
Shape (1) V) (usft) (usft) (usft) (usft) (usft) Latitude Longitude
1L-151-1_T04 0.00 0.00 5,942.00-6,900.471,138,532.27 5,947,720.00
plan misses target center by 1139471.22usft at 6300.00usft MD (5855.75 TVD,-792.86 N. -922.58 E)
Point
1L-15L1_T09 0.00 0.00 5,930.00-5,498.981,138,845.74 5,949,123.00
plan misses target center by 1139778.03usft at 6300.00usft MD (5855.75 TVD,-792.86 N,-922.58 E)
Point
11--151-1_Fault3 0.00 0.00 5,941.00-5,360.221,138,894.48 5,949,262.00
plan misses target center by 1139826.21 usft at 6300.00usft MD (5855.75 TVD,-792.86 N,-922.58 E)
Polygon
Point 1 5,941.00 0.00 0.00 5,949,262.00
Point 2 5,941.00 1.00 1.00 5,949,263.01
1L-151-1_T08 0.00 0.00 5,923.00-5,769.521,138,753.29 5,948,852.00
- plan misses target center by 1139686.74usft at 6300.00usft MD (5855.75 TVD,-792.86 N,-922.58 E)
- Point
1L-15L1_Fault1_M 0.00 0.00 0.00-6,611.351,138,514.80 5,948,009.00
plan misses target center by 1139467.28usft at 6300.00usft MD (5855.75 TVD,-792.86 N,-922.58 E)
Rectangle (sides W1,000.00 1-11.00 D0.00)
1L-151-1_T02 0.00 0.00 5,936.00-7,200.341,138,877.72 5,947,422.00
- plan misses target center by 1139818.31 usft at 6300.00usft MD (5855.75 TVD,-792.86 N,-922.58 E)
- Point
11--151-1_T05 0.00 0.00 5,929.00-6,677.201,138,485.45 5,947,943.00
plan misses target center by 1139423.22usft at 6300.00usft MD (5855.75 TVD,-792.86 N,-922.58 E)
Point
1L-151-1_T12 0.00 0.00
5,996.00
-4,520.741,139,009.94
5,950,102.00
- plan misses target center by 1139938.62usft at 6300.00usft MD (5855.75 TVD,-792.86 N,-922.58 E)
- Point
1L-15L1-01_Faultl_M 0.00 0.00
0.00
-8,085.131,138,253.95
5,946,534.00
plan misses target center by 1139214.92usft at 6300.00usft MD (5855.75 TVD,-792.86 N,-922.58 E)
Rectangle (sides W1,000.00 1-11.00 D0.00)
1L-151-1_T14 0.00 0.00
6.001.00
-3,903.131,139,097.23
5,950,720.00
plan misses target center by 1140024.06usft at 6300.00usft MD (5855.75 TVD,-792.86 N. -922.58 E)
Point
1L-151-1_Faultl 0.00 0.00
5,928.00
-6,611.351,138,514.80
5,948,009.00
plan misses target center by 1139452.23usft at 6300.00usft MD (5855.75 TVD,-792.86 N,-922.58 E)
Polygon
Point 1
5,928.00
0.00 0.00
5,948,009.00
Point 2
5,923.00
1.00 1.00
5,948,010.01
1L-15 CTD Polygon Sou 0.00 0.00
0.00
-7,318.271,139.240.13
5,947,306.00
- plan misses target center by 1140196.42usft at 6300.00usft MD (5855.75 TVD,-792.86 N,-922.58 E)
- Polygon
Point 1
0.00
0.00 0.00
5,947,306.00
Point
0.00
-130.08-368.72
5,947,173.98
Point 3
0.00
-192.21-536.07
5,947,110.97
Point 4
0.00
-378.39-696.07
5,946,923.96
Point 5
0.00
-580.00-774.13
5,946,721.96
Point 6
0.00
-898.95-789.81
5,946,402.96
Point
0.00
-1,245.77-832.64
5,946,055.95
Point
0.00
-1,641.47-897.72
5,945,659.95
Point
0.00
-2,231.27-948.83
5,945,069.95
Point 10
0.00
-2,488.29-950.18
5,944,812.95
Point 11
0.00
-2,403.13-1,359.78
5,944,895.93
Point 12
0.00
-1,903.52-1,274.14
5,945,395.94
1, 678, 364.00
70' V 5.681 N 140' 33' 10.121 W I
1,678,670.00 70' 1' 18.829 N 140' 32' 55.212 W �
1,678,718.00 70° V 20.105 N 140° 32' 53.233 W
1, 678, 718.00
1, 678, 718.99
1,678,579.00 70' 1' 16.338 N 140- 32' 58.998 W
1,678,345.00 70' V 8.514 N 140- 33' 9.378 W
1,678,711.00 70° T 2.263 N 140° 33' 1.599 W
1,678,316.00 70° 1' 7.917 N 140' 33' 10.494 W
1,678,829.00 70' 1' 28.087 N 140- 32' 46.353 W
1,678,092.00 70° 0' 54.586 N 140° 33' 23.098 W
1,678,913.00 70' 1' 33.956 N 140- 32' 41.224 W I
1,678,345.00
1,678, 345.00
1,678, 345.99
1,679,074.00
1, 679, 074.00
1,678,706.01
1, 678, 539.01
1, 678, 380.02
1, 678, 303.03
1, 678, 289.05
1,678,248.06
1,678,185.09
1,678,137.11
1,678,137.12
1,677,727.12
1,677, 810.10
700 1' 8.514 N 140' 33' 9.378 W
70'V0.586N 140' 32'51.816 W I
1012512016 12-12:56PM Page 6 COMPASS 5000.1 Build 74
ConocoPhillips CAaI
ConocoPhillips Planning Report BAKER
HUGHES
Database:
EDM Alaska NSK Sandbox
Company:
ConocoPhillips (Alaska) Inc. -Kup2
Project:
Kuparuk River Unit
Site:
Kuparuk 1L Pad
Well:
1L-15
Wellbore:
1 L-15L1
Design:
1L-15L1_wp02
Local Co-ordinate Reference:
TVD Reference:
MD Reference:
North Reference:
Survey Calculation Method:
Well 1L-15
Mean Sea Level
1L-15 @ 118.00usft (Parker 141)
True
Minimum Curvature
Point13
0.00
-1,438.66
-1,236.70
5,945,860.94
1,677,845.07
Point 14
0.00
-827.83
-1,191.48
5,946,471.94
1,677,887.04
Point 15
0.00
-418.01
-1,148.32
5,946,881.95
1,677,928.03
Point 16
0.00
-112.79
-993.70
5,947,187.95
1,678,081.01
Point 17
0.00
135.99
-756.37
5,947,437.96
1,678,316.99
Point 18
0.00
266.58
-484.65
5,947,569.98
1,678,587.99
Point 19
0.00
368.47
-81.07
5,947,674.00
1,678,990.98
Point20
0.00
0.00
0.00
5,947,306.00
1,679.074.00
1L-151-1_Fault3_M 0.00 0.00
0.00
-5,360.221,138,894.48
5,949,262.00
1,678,718.00
70' V 20.105 N 140' 32' 53.233 W
- plan misses target center by 1139841.25usft
at 6300.00usft MD (5855.75 TVD,-792.86 N,-922.58 E)
- Rectangle (sides W1,000.00 1-11.00 D0.00)
1 L-15 CTD Polygon Nort 0.00 0.00
0.00
-7,311.271,139,240.17
5,947,313.00
1,679,074.00
70' 1' 0.654 N 140' 32' 51.785 W
- plan misses target center by 1140196.42usft
at 6300.00usft MD (5855.75 TVD,-792.86 N,-922.58 E)
Polygon
Point
0.00
0.00 0.00
5,947,313.00
1,679,074.00
Point
0.00
-75.99-194.42
5,947,235.99
1,678,880.00
Point
0.00
9.52-479.00
5,947.319.98
1,678,595.00
Point
0.00
246.78-713.78
5,947,555.97
1,678,358.99
Point 5
0.00
622.80-899.83
5,947,930.96
1,678,170.97
Point
0.00
977.12-952.97
5,948,284.96
1,678,115.95
Point
0.00
1,261.70-868.47
5,948,569.95
1,678,198.94
Point
0.00
1,648.28-588.41
5,948,957.97
1.678,476.91
Point 9
0.00
2,418.87-494.35
5,949,728.98
1,678,566.88
Point 10
0.00
2,759.46-409.55
5,950,069.98
1,678,649.86
Point 11
0.00
3,417.93-294.08
5,950,728.99
1,678,761.82
Point 12
0.00
3,660.55-216.80
5,950,971.99
1,678,837.81
Point 13
0.00
3,645.42 -1.85
5,950,958.00
1.679,052,82
Point 14
0.00
3,423.14 45.99
5,950,736.00
1,679,101.83
Point 15
0.00
3,069.33 2.12
5,950,382.00
1,679,059.84
Point16
0.00
2,715.70 -75.74
5.950,027.99
1,678,983.86
Point 17
0.00
2,403.12-161.39
5,949,714.99
1,678,899.88
Point 18
0.00
2,077.02-149.11
5,949;389.00
1,678,913.89
Point 19
0.00
1,765.13-177.75
5,949,076.99
1,678,886.91
Point20
0.00
1,459.80-311.37
5,948,770.98
1,678,754.92
Point21
0.00
1,127.83-515.13
5,948,437.97
1,678,552.95
Point22
0.00
925.99-550.20
5.948,235.97
1,678,518.95
Point23
0.00
592.57-475.94
5,947,902.98
1,678,594.97
Point24
0.00
390.71-316.98
5,947,701.98
1,678,754.98
Point25
0.00
354.47 -81.15
5,947,667.00
1,678,990.98
Point26
0.00
0.00 0.00
5,947,313.00
1,679,074.00
1 L-151-1 T10 0.00 0.00
5,944.00
-5,374.081,138,867.40
5,949,248.00
1,678,691.00
70° V 20.010 N 140' 32' 54.062 W
plan misses target center by 1139799. 1 9usft at 6300.00usft MD (5855.75 TVD,-792.86 N,-922.58 E)
Point
1 L-151-1_T03 0.00 0.00
5,932.00
-7,158.421,138,704.92
5,947,463.00
1,678,538.00
70° V 2.923 N 140° 33' 6.325 W
plan misses target center by 1139645.28usft at 6300.00usft
MD (5855.75 TVD,-792.86 N,-922.58 E)
Point
1L-15L1_T07 0.00 0.00
5,915.00
-6,066.811,138,613.70
5,948,554.00
1,678,441.00
70' 1' 13.656 N 140' 33' 4.236 W
plan misses target center by 1139548.48usft at 6300.00usft
MD (5855.75 TVD,-792.86
N,-922.58 E)
Point
1 L-15L1_T13 0.00 0.00
5,982.00
-4,228.971,139,060.50
5,950,394.00
1,678,878.00
70° 1' 30.846 N 140° 32' 43.666 W
plan misses target center by 1139988.26usft at 6300.00usft MD (5855.75 TVD,-792.86
N,-922.58 E)
Point
1L-151-1_Fault2 M 0.00 0.00
0.00
-5,758.571,138,763.35
5,948,863.00
1,678,589.00
70° 1' 16A30 N 140' 32' 58.665 W
plan misses target center by 1139711.79usft at 6300.00usft MD (5855.75 TVD,-792.86
N,-922.58 E)
Rectangle (sides 011,000.00 1-11.00 D0.00)
1L-151-1 T01 0.00 0.00
5,943.00
-7,187.261,139,051.81
5,947,436.00
1,678,885.00
70° V 2.135 N 140' 32' 56,601 W
plan misses target center by 1139992.32usft at 6300.00usft MD (5855.75 TVD,-792.86
N,-922.58 E)
Point
1L-151-1_T06 0.00 0.00
5,920.00
-6,400.241,138,499.92
5,948,220.00
1,678,329.00
70' V 10.585 N 140° 33' 8.896 W
1012512016 12:12:56PM Page 7 COMPASS 5000.1 Build 74
y- ConocoPhillips r&..
ConocoPhillips Planning Report BAKER
HUGHES
Database:
EDM Alaska NSK Sandbox
Company:
ConocoPhillips (Alaska) Inc. -Kup2
Project:
Kuparuk River Unit
Site:
Kuparuk 1 L Pad
Well:
1L-15
Wellbore:
1 L-151-1
Design:
1 L-1511_wp02
Point
Local Co-ordinate Reference:
TVD Reference:
MD Reference:
North Reference:
Survey Calculation Method:
Well 1 L-15
Mean Sea Level
1L-15 @ 118.00usft (Parker 141)
True
Minimum Curvature
1 L-151-1_T11 0.00 0.00 5,954.00-4,839.51 1,138,960.25 5,949,783.00
1,678,781.00 70' 1' 25.065 N 140' 32' 49.132 W
plan misses target center by 1139890.01 usft at 6300.00usft MD (5855.75 TVD,-792.86 N. -922.58 E)
Point
1L-15L1_Fault2 0.00 0.00 5,923.00-5,758.571,138,763.35 5,948,863.00
1,678,589.00 70' 1' 16.430 N 140' 32' 58.665 W
plan misses target center by 1139696.75usft at 6300.00usft MD (5855.75 TVD,-792.86 N,-922.58 E)
Polygon
Point 1 5,923.00 0.00 0.00 5,948,863.00
1,678,589.00
Point 5,923.00 1.00 1.00 5,948,864.01
1,678,589.99
1L-15L1-01_Faultl 0.00 0.00 5,992.00-8,085.131,138,253.95 5,946,534.00
1,678,092.00 70' 0' 54.586 N 140' 33' 23.098 W
plan misses target center by 1139199.88usft at 6300.00usft MD (5855.75 TVD,-792.86 N,-922.58 E)
Polygon
Point 1 5,992.00 0.00 0.00 5,946,534.00
1,678,092.00
Point 5,992.00 1.00 1,00 5,946,535.01
1,678,092.99
Casing Points
Measured Vertical Casing Hole
Depth Depth Diameter Diameter
(usft) (usft) Name (in) (in)
10,200,00 5,995.03 2 3/8 2.375 3.000
Plan Annotations
Measured
Vertical
Local Coordinates
Depth
Depth
+N/S
+E/-W
(usft)
(usft)
(usft)
(usft)
Comment
6,300.00
5,855.75
-792.86
-922.58
TIP
6,330.00
5,878.72
-804.54
-937.94
KOP
6,351.00
5,894.20
-813.13
-949.23
End 20 dls, Start 40 dls
6,464.48
5,936.84
-874.91
-1.030.35
4
6,634.48
5,933.71
-884.15
-1.190.25
End 40 dls, Start 7 dls
6,710.00
5,930.97
-842.69
-1,253.29
6
6,785.00
5,927.96
-795.96
-1,311.84
7
6,860.00
5,926.67
-744.36
-1,366.22
8
6,985.00
5,932.16
-649.41
-1,447.14
9
7,110.00
5,937.59
-544.60
-1,514.81
10
7,210.00
5,933.10
-455.69
-1,560.22
11
7,310.00
5,925.72
-363.11
-1,597.14
12
7.410.00
5,921.32
-266.67
-1,622.96
13
7,570.00
5,915.70
-107.87
-1,639.41
14
7,900.00
5,910.30
213.62
-1,575.78
15
8,160.00
5,914.47
433.73
-1,439.51
16
8,260.00
5,917.40
513.16
-1,378.93
17
8,560.00
5,925.97
786.99
-1,260.86
18
8,635.00
5,931.24
860.16
-1,245.41
19
8,710.00
5,936.75
933.87
-1,232.82
20
8,825.00
5,938.55
1,048.40
-1,223.79
21
8,975.00
5,939.35
1,197.41
-1,208.53
22
9,100.00
5,944.26
1,321.27
-1,193.40
23
9,225.00
5,952.37
1,444.90
-1,177.73
24
9,375.00
5,973.18
1,591.58
-1,155.61
25
9,525.00
5,991.45
1,739.57
-1,141.44
26
9,705.00
5,985.62
1,916.03
-1,108.32
27
9,855.00
5,978.24
2,062.76
-1,079.11
28
9,955.00
5,981.01
2,161.22
-1,062.17
29
10,200.00
5,995.03
2,404.24
-1,044.28
Planned TD at 10200.00
1012512016 12:12:56PM Page 8 COMPASS 5000.1 Build 74
o�E
n E
�v m m
88888
y�£
K ¢ K K
'63N?_
•� o
7 p J
N N
`w a
�� or
2' �7
. m,7.J
a0.
Y = o
C
wu 3ao
a Zc
IN
J
R
a
�
OD
m6
O
Jp
V
O
0
0
rn
m
o n
O N
Q F--CnmO o -- - - -d
V
U O-T t o N m O O
N OO t` V c OC co - O �o
O Z
Cn V t- V o D ((� o (o N� M O e D (o I
-dLo
�N �o aap� OON a-MMM I�(DN
c0 �OM(('>(D� a00 V m
� �
�co
�cuNNNNNMMMM
woC) c> 00000D CD
(n
-coJ
c� o o 0 0 0 0 0 0 0 0 0 0 0 0 0 0
LL O O O O o O V' a 0 C 7 o u o N O O N
M NC�> O ti O Q 7 O O o 0 O� O
o
rn o 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
w O o 0 0 0 0 0 0 0 0 0 0 0 cD 0 0
?> I C' ) 1 O e- (o a O N O o N N
V (D t��o O(D ctO �o V u�OOoO�O
j y O .6 M M N O
O)V
C 6)
+ O(D O��(o t�a000M(�O M
O Mkt W a0 oOOO0000
- N
ti N
N N
cN
.- I
w T
(n N O� O M L o O (D O O M (D V (o O
n O n O (o O N (O 'I:O N (D rl—
M
L(7
Z M M O (o I O M N o N 1 o N
w
+ CD V'MNti OOO�
O �cp (o t-OONM�o (DON
�NNNNNN('7
J
J
W
Cn (o m O N o O O
M
w c t O o 0 1� M M V' V O N 1
�O
0(.DN (n (o O oD (O UJOOit O(DO V O
e' M (" ) N N N M o t D C o t ti I- W o D O O
� �
o
Z W
' N O uD Vr O oo O (o Lo Vr a 7 co
�'
Q)
QLT) O V' (M M N— N -� t� N N M 0 0 a p O
N O I t- M N (o O N a O V M M
(O (o (o M N O OD oD O O OD O O
N N N N N N
U 0 0 0 o D a D N
C ONO O N N oD M M M 0 0 0 O o (">
cD
O O m t- t- 0 0 m 0D
6� W
cD
O a e
WC)
+
Q O O O O O O O o 0 0 0 0 0 0 0 0
o 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
00000000(D Ul) �CD
V (o to�-- L o (o ti t t- N N O
�o(o I-O Mco o00 NM �o Il,OM
(o (o (o (D t- n r r W aD w a oD oD O O
CnO
O
U, NM<t �o(D �oD OO NM o(D
ZO
u' �a--����
+
(ui/8sn S8) gldaQ Inivan anal
00
C,
O
O
0
N
G
0
U
N
U
1�
ConocoPhillips
noc hHUps (/,Mas a) Deco JKup2
Kuparuk River Unit
Kuparuk 1 L Pad
1 L-15
1 L-15L1-01
Plan: 1 L-15L1-01_wp03
25 October, 2016
we p P"--
'A as
BAKER
HUGHES
ConocoPhillips
Database:
EDM Alaska NSK Sandbox
Company:
ConocoPhillips (Alaska) Inc. -Kup2
Project:
Kuparuk River Unit
Site:
Kuparuk 1 L Pad
Well:
1L-15
Wellbore:
1 L-151-1-01
Design:
1 L-15L1-01_wp03
ConocoPhillips
Planning Report
Local Co-ordinate Reference:
TVD Reference:
MD Reference:
North Reference:
Survey Calculation Method:
Well 1 L-15
Mean Sea Level
1 L-15 @ 118.00usft (Parker 141)
True
Minimum Curvature
Project Kuparuk River Unit, North Slope Alaska, United States
Map System: US State Plane 1927 (Exact solution) System Datum: Mean Sea Level
Geo Datum: NAD 1927 (NADCON CONUS) Using Well Reference Point
Map Zone: Alaska Zone 04 Using geodetic scale factor
WEaI
BAKER
HUGHES
Site Kuparuk 1 L Pad
Site Position: Northing: 5,949,190.90usft Latitude: 70° 16' 19.650 N
From: Map Easting: 539,916.78usft Longitude: 149' 40' 37.763 W
Position Uncertainty: 0.00 usft Slot Radius: 0.000 in Grid Convergence: 0.30 °
Well 1 L-15
Well Position +Nl-S
0.00 usft Northing:
5,948,581.09 usft
Latitude: 70° 16' 13.652 N
+E/-W
0.00 usft Easting:
539,922.94 usft
Longitude: 149° 40' 37.678 W
Position Uncertainty
0.00 usft Wellhead Elevation:
usft
Ground Level: 83.20usft
Wellbore 1L-15L1-01
Magnetics Model Name Sample Date Declination Dip Angle Field Strength
(°) (°) (nT)
BG G M2016 1211 /2016 17.86 80.91 57,543
Design 1L-15L1-01_wp03
Audit Notes:
Version:
Vertical Section:
Phase:
Depth From (TVD)
(usft)
-83.20
PLAN
+N/-S
(usft)
0.00
Tie On Depth:
+E/-W
(usft)
0,00
6,540.00
Direction
(I
200.00
Plan Sections
Measured
TVD Below
Dogleg
Build
Turn
Depth
Inclination
Azimuth
System
+Nl-S
+E/-W
Rate
Rate
Rate
TFp
(usft)
(°)
(I
(usft)
(usft)
(usft)
(°/100ft)
(°/100ft)
(°1100ft)
Target
6,540.00
91.01
262.90
5,936.16
-903.11
-1,099.47
0.00
0.00
0.00
0.00
6,610.00
95.25
260.45
5,932.34
-913.22
-1,168.61
7.00
6.06
-3.51
-30.00
6,760.00
90.00
251.34
5,925.48
-949.70
-1,313.73
7.00
-3.50
-6.06
-120.00
6,960.00
90.00
237.34
5,925.48
-1,036.07
-1,493.57
7.00
0.00
-7.00
-90.00
7,110.00
87.28
227.20
5,929.04
-1,127.70
-1,612.01
7.00
-1.81
-6.77
-105.00
7,310.00
87.28
213.18
5,938.52
-1,279.93
-1,740.61
7.00
0.00
-7.01
-90.00
7,610.00
85.82
192.20
5,956.57
-1,554.65
-1,855.49
7.00
-0.49
-7.00
-94.00
7,850.00
89.31
175.75
5,966.77
-1,793.00
-1,872.01
7.00
1.46
-6.85
-78.00
8,050.00
89.31
189.75
5,969.17
-1,992.26
-1,881.56
7.00
0.00
7.00
90.00
8,150.00
89.31
182.75
5,970.37
-2,091.60
-1,892.44
7.00
0.00
-7.00
-90.00
8,275.00
87.05
191.20
5,974.34
-2,215.49
-1,907.59
7.00
-1.81
6.77
105.00
6,375.00
87.05
198.21
5,979.49
-2,312.03
-1,932.92
7.00
0.00
7.01
90.00
8,575.00
89.00
184.34
5,986.40
-2,507.56
-1,971.90
7.00
0.97
-6.93
-82.00
8,725.00
89.00
194.84
5,989.02
-2,655.24
-1,996.85
7.00
0.00
7.00
90.00
9,025.00
89.00
173.84
5,994.28
-2,952.66
-2,019.42
7.00
0.00
-7.00
-90.00
9,300.00
88.32
193.08
6,000.70
-3,225.79
-2,035.92
7.00
-0.24
7.00
92.00
1012512016 12:25:34PM Page 2 COMPASS 5000.1 Build 74
6
ConocoPhillips MCA..
ConocoPhillips Planning Report BAKER
HUGHES
Database:
EDM Alaska NSK Sandbox
Local Co-ordinate Reference:
Well 1L-15
Company:
ConocoPhillips (Alaska) Inc. -Kup2
TVD Reference:
Mean Sea Level
Project:
Kuparuk River Unit
MD Reference:
1 L-15 @ 118.00usft (Parker 141)
Site:
Kuparuk 1L Pad
North Reference:
True
Well:
1L-15
Survey Calculation Method:
Minimum Curvature
Wellbore:
1 L-15L1-01
Design:
1 L-15L1-01_wp03
Planned Survey
Measured
TVD Below
Vertical
Dogleg
Toolface
Map
Map
Depth Inclination
Azimuth
System
+NHS
+E1-W
Section
Rate
Azimuth
Northing
Easting
(usft)
(°)
(°)
(usft)
(usft)
(usft)
(usft)
(°1100ft)
(°)
(usft)
(usft)
6,540.00
91.01
262.90
5.936.16
-903.11
-1,099.47
1,224.69
0.00
0.00
5,947,672.25
538,828.38
TIP/KOP
6,610.00
95.25
260.45
5,932.34
-913.22
-1.168.61
1,257.84
7.00
-29.95
5,947,661.77
538,759.30
Start 7 dls
6,760.00
90.00
251.34
5,925.48
-949.70
-1,313.73
1,341.75
7.00
-119.72
5,947,624.53
538,614.39
3
6.960.00
90.00
237.34
5,925.48
-1,036.07
-1.493.57
1,484.42
7.00
-90.00
5,947.537.21
538,435.04
4
7,110.00
87.28
227.20
5,929.04
-1,127.70
-1,612.01
1,611.03
7.00
-105.08
5,947,444.96
538,317.09
5
7,310.00
87.28
213.18
5,938.52
-1,279.93
-1,740.61
1,798.06
7.00
-90.33
5,947,292.07
538,189.32
6
7,610.00
85.82
192.20
5,956.57
-1,554.65
-1,855.49
2,095.51
7.00
-94.59
5,947,016.77
538,075.90
7
7,850.00
89.31
175.75
5,966.77
-1,793.00
-1,872.01
2,325.14
7.00
-78.43
5,946.778,36
538,060.65
8
8,050.00
89.31
189.75
5,969.17
-1,992.26
-1,881.56
2,515.65
7.00
90.08
5,946,579.07
538,052.15
9
8,150.00
89.31
182.75
5.970.37
-2,091.60
-1,892.44
2,612.71
7.00
-90.04
5,946,479.69
538,041.81
10
8.275.00
87.05
191.20
5,974.34
-2,215.49
-1,907.59
2,734.31
7.00
105.11
5,946,355.73
538,027.32
11
8,375.00
87.05
198.21
5,979.49
-2,312.03
-1,932.92
2,833.69
7.00
90.18
5,946,259.07
538,002.50
12
8,575.00
89.00
184.34
5.986.40
-2,507.56
-1,971.90
3,030.77
7.00
-82.28
5,946,063.35
537,964.56
13
8,725.00
89.00
194.84
5,989.02
-2,655.24
-1,996.85
3,178.07
7.00
90.09
5,945,915.56
537,940.40
14
9,025.00
89.00
173.84
5,994.28
-2,952.66
-2.019.42
3,465.27
7.00
-90.19
5,945,618.05
537,919.41
15
9,300.00
88.32
193.08
6,000.70
-3,225.79
-2,035.92
3,727.58
7.00
92.21
5,945,344.86
537,904.36
Planned TD at 9300.00
1012512016 12:25:34PM Page 3 COMPASS 5000.1 Build 74
ConocoPhillips w3:.
ConocoPhillips Planning Report BAKER
HUGHES
Database:
EDM Alaska NSK Sandbox
Local Co-ordinate Reference:
Well 1L-15
Company:
ConocoPhillips (Alaska) Inc. -Kup2
TVD Reference:
Mean Sea Level
Project:
Kuparuk River Unit
MD Reference:
1 L-15 @ 118.00usft (Parker 141)
Site:
Kuparuk 1L Pad
North Reference:
True
Well:
1L-15
Survey Calculation Method:
Minimum Curvature
Wellbore:
1 L-15L1-01
Design:
1 L-15L1-01_wp03
Targets
Target Name
hitlmiss target Dip Angle Dip Dir. TVD +N/S +E/-W Northing
Easting
Shape (1) (1) (usft) (usft) (usft) (usft)
(usft)
Latitude Longitude
1 L-151-1-01_T02 0.00 0.00 5,933.00-7,235.331,138,876.53 5,947,387.00
1,678,710.00
70' V 1.925 N 1400 33' 1.783 W
plan misses target center by 1139993.59usft at 6540.00usft MD (5936.16 TVD,-903.11 N,-1099.47 E)
Point
11--151-1_Fault3 0.00 0.00 5,941.00-5,360.221,138,894.48 5,949,262.00
1,678,718.00
70' V 20.105 N 140' 32' 53.233 W
plan misses target center by 1140002.67usft at 6540.00usft MD (5936.16 TVD,-903.11 N,-1099.47 E)
Polygon
Point 1 5,941.00 0.00 0.00 5,949,262.00
1,678,718.00
Point 5,941.00 1.00 1.00 5,949,263.01
1,678.718.99
11--151-1_Faultl_M 0.00 0.00 0.00-6,611.351,138,514.80 5,948,009.00
1,678,345.00
70' V 8.514 N 140' 33' 9.378 W
plan misses target center by 1139644.03usft at 6540.O0usft MD (5936.16 TVD,-903.11 N,-1099.47 E)
Rectangle (sides W1,000.00 1-11.00 D0.00)
1L-15L1-01_T03 0.00 0.00 5,930.00-7,349.181,138,655.90 5,947,272.00
1,678,490.00
70° V 1.143 N 140' 33' 8.534 W
plan misses target center by 1139773.60usft at 6540.00usft MD (5936.16 TVD,-903.11 N,-1099.47 E)
Point
1 L-151-1-01_T04 0.00 0.00
5,943.00
-7,589.181,138,463.61
5,947,031.00
1,678,299.00
70' 0' 59.094 N 140° 33' 15.022 W
plan misses target center by 1139582.70usft at 6540.00usft MD (5936.16 TVD,-903.11
N,-1099.47 E)
Point
11--151-1-01_Fault1_M 0.00 0.00
0.00
-8,085.131,138,253.95
5,946,534.00
1,678,092.00
70' 0' S4.586 N 140° 33' 23.098 W
plan misses target center by 1139391.53usft at 6540.00usft MD (5936.16 TVD,-903.11 N,-1099.47 E)
Rectangle (sides W1,000.00 1-11.00 D0.00)
1 L-151-1_Faultl 0.00 0.00
5,928.00
-6,611.351,138,514.80
5,948,009.00
1,678,345.00
70' V 8.514 N 140° 33' 9.378 W
plan misses target center by 1139628.57usft at 6540.00usft MD (5936.16 TVD,-903.11
N,-1099.47 E)
Polygon
Point
5,928.00
0.00 0.00
5,948,009.00
1,678,345.00
Point
5,928.00
1.00 1.00
5,948,010.01
1,678,345.99
1 L-15 CTD Polygon Sou 0.00 0.00
0.00
-7,318.271,139,240.13
5,947,306.00
1,679,074.00
70° 1' 0.586 N 140' 32' 51.816 W
- plan misses target center by 1140373.10usft at 6540.00usft MD (5936.16 TVD,-903.11
N,-1099.47 E)
Polygon
Point 1
0.00
0.00 0.00
5,947,306.00
1,679,074.00
Point
0.00
-130.08-368.72
5,947,173.98
1,678,706.01
Point
0.00
-192.21-536.07
5.947,110.97
1,678,539.01
Point
0.00
-378.39-696.07
5,946,923.96
1,678,380.02
Points
0.00
-580.00-774.13
5,946,721.96
1,678,303.03
Point
0.00
-898.95-789.81
5,946,402.96
1,678,289.05
Point
0.00
-1,245.77-832.64
5,946,055.95
1,678,248.06
Point
0.00
-1,641.47-897.72
5,945,659.95
1,678,185.09
Point
0.00
-2,231.27-948.83
5,945,069.95
1,678,137.11
Point 10
0.00
-2,488.29-950,18
5,944,812.95
1,678,137.12
Point 11
0.00
-2,403.13-1,359.78
5,944,895.93
1,677,727.12
Point12
0.00
-1,903.52-1,274.14
5,945,395.94
1,677,810.10
Point13
0.00
-1,438.66-1,236.70
5,945,860.94
1.677,845.07
Point14
0.00
-827.83-1,191.48
5,946,471.94
1,677,887.04
Point 15
0.00
-418.01-1,148.32
5,946,881.95
1,677,928.03
Point 16
0.00
-112.79-993.70
5,947,187.95
1,678,081.01
Point 17
0.00
135.99-756.37
5,947,437.96
1,678,316.99
Point 18
0.00
266.58-484.65
5,947,569.98
1,678,587.99
Point 19
0.00
368.47 -81.07
5,947,674.00
1,678,990.98
Point20
0.00
0.00 0.00
5,947,306.00
1,679.074.00
1 L-151-1_Fault3_M 0.00 0.00
0.00
-5,360.221,138,894.48
5,949,262.00
1,678,718.00
70' V 20.105 N 140' 32' S3.233 W
- plan misses target center by 1140018.12usft at 6540.00usft
MD (5936.16 TVD,-903.11
N,-1099.47 E)
- Rectangle (sides W1,000.00 1-11.00 D0.00)
1L-15 CTD Polygon Non 0.00 0.00
0.00
-7,311.271,139,240.17
5,947,313.00
1,679,074.00
70° V 0.654 N 140° 32' S1.785 W
Ian misses target center by 1140373.10usft at 6540.O0usft MD 5936.16 TVD-903.11
N-1099.47 E
1012512016 12:25:34PM Page 4 COMPASS 5000.1 Build 74
ConocoPhillips
WIPS..
ConocoPhillips
Planning Report
BAKER
HUGHES
Database: EDM Alaska NSK Sandbox
Local Co-ordinate Reference:
Well 1L-15
Company: ConocoPhillips (Alaska) Inc. -Kup2
TVD Reference:
Mean Sea Level
Project: Kuparuk River Unit
MD Reference:
1 L-15 @ 118.00usft (Parker 141)
Site: Kuparuk 1 L Pad
North Reference:
True
Well: 1 L-15
Survey Calculation Method:
Minimum Curvature
Wellbore: 1 L-15L1-01
Design: 1 L-15L1-01_wp03
Polygon
Point 1
0.00
0.00 0.00
5,947.313.00
1,679,074.00
Point
0.00
-75.99-194.42
5,947,235.99
1,678,880.00
Point 3
0.00
9.52-479.00
5,947,319.98
1,678,595.00
Point
0.00
246.78-713.78
5,947,555.97
1,678,358.99
Points
0.00
622.80-899.83
5,947,930.96
1,678,170.97
Point
0.00
977.12-952.97
5,948,284.96
1,678,115.95
Point?
0.00
1,261.70-868.47
5,948,569.95
1,678,198.94
Point
0.00
1,648.28-588.41
5,948,957.97
1,678,476.91
Point 9
0.00
2,418.87-494.35
5,949,728.98
1.678,566.88
Point 10
0.00
2,759.46-409.55
5,950,069.98
1,678,649.86
Point 11
0.00
3,417.93-294.08
5,950,728.99
1,678,761.82
Point 12
0.00
3,660.55-216.80
5,950,971.99
1,678,837.81
Point 13
0.00
3,645.42 -1.85
5,950,958.00
1,679,052.82
Point 14
0.00
3,423.14 45.99
5,950,736.00
1,679,101.83
Point 15
0.00
3,069.33 2.12
5,950,382.00
1,679,059.84
Point 16
0.00
2,715.70 -75.74
5,950,027.99
1,678,983.86
Point 17
0.00
2,403.12-161.39
5,949,714.99
1,678,899.88
Point 18
0.00
2.077.02-149.11
5,949,389.00
1,678,913.89
Point 19
0.00
1,765.13-177.75
5,949,076.99
1,678,886.91
Point20
0.00
1,459.80-311.37
5,948,770.98
1,678,754.92
Point21
0.00
1,127.83-515.13
5,948,437.97
1,678,552.95
Point 22
0.00
925.99-550.20
5,948,235.97
1.678,518.95
Point23
0.00
592.57-475.94
5,947,902.98
1,678,594.97
Point 24
0.00
390.71-316.98
5,947,701.98
1,678,754.98
Point25
0.00
354.47 -81.15
5,947,667.00
1,678,990.98
Point26
0.00
0.00 0.00
5,947,313.00
1,679,074.00
1L-151-1-01_T01 0.00 0.00
5,938.00
-7,167.421,139,081.91
5,947,456.00
1,678,915.00
70' V 2.283 N 140° 32' 55.661 W
- plan misses target center by 1140198.60usft at 6540.00usft MD (5936.16 TVD,-903.11
N,-1099.47 E)
- Point
1 L-151-1-01_T05 0.00 0.00
5,969.00
-8,065.351,138,297.06
5,946,554.00
1,678,135.00
70' 0' 54.715 N 140' 33' 21.790 W
- plan misses target center by 1139419.05usft at 6540.00usft
MD (5936.16 TVD,-903.11
N,-1099.47 E)
- Point
1L-151-1_Fault2_M 0.00 0.00
0.00
-5,758.571,138,763.35
5,948,863.00
1,678,589.00
70° 1' 16.430 N 140° 32' S8.665 W
plan misses target center by 1139888.62usft at 6540.00usft MD (5936.16 TVD,-903.11
N,-1099.47 E)
Rectangle (sides W1,000.00 1-11.00 D0.00)
1L-151-1-01 T07 0.00 0.00
5,979.00
-8,598.881,138,196.22
5,946,020.00
1,678,037.00
70' 0' 49.682 N 140° 33' 26.938 W
plan misses target center by 1139321.69usft at 6540.00usft
MD (5936.16 TVD,-903.11
N,-1099.47 E)
Point
1L-151-1-01_T08 0.00 0.00
5,986.00
-8,946.671,138,149.37
5,945,672.00
1,677,992.00
70' 0' 46.374 N 140' 33' 29.757 W
plan misses target center by 1139277.24usft at 6540.00usft
MD (5936.16 TVD,-903.11
N,-1099.47 E)
Point
1L-15L1-01 T06 0.00 0.00
5,971.00
-8,320.101,138,243.71
5,946,299.00
1,678,083.00
70' 0' 52.319 N 140' 33' 24.396 W
plan misses target center by 1139367.32usft at 6540.00usft MD (5936.16 TVD,-903.11
N,-1099.47 E)
Point
1L-15L1_Fault2 0.00 0.00
5,923.00
-5,758.571,138,763.35
5,948,863.00
1,678,589.00
70° V 16.430 N 140° 32' S8.665 W
plan misses target center by 1139873.17usft at 6540.00usft
MD (5936.16 TVD,-903.11
N,-1099.47 E)
Polygon
Point 1
5,923.00
0.00 0.00
5.948,863.00
1,678,589.00
Point
5,923.00
1.00 1.00
5,948,864.01
1,678,589.99
1L-151-1-01_Faultl 0.00 0.00
5,992.00
-8,085.131,138,253.95
5,946,534.00
1,678,092.00
70° 0' 54.586 N 140' 33' 23.098 W
- plan misses target center by 1139376.07usft at 6540.00usft MD (5936.16 TVD,-903.11
N,-1099.47 E)
- Polygon
Point 1
5,992.00
0.00 0.00
5,946,534.00
1,678,092.00
Point
5,992.00
1.00 1.00
5,946,535.01
1.678,092.99
1L-15L1-01_T09 0.00 0.00
5,992.00
-9,497.421,138,090.44
5,945,121.00
1,677,936.00
70' 0' 41.112 N 140' 33' 33.787 W
plan misses target center by 1139222.34usft at 6540.00usft MD (5936.16 TVD,-903.11
N,-1099.47 E)
Point
1012512016 12:25:34PM Page 5 COMPASS 5000.1 Build 74
ConocoPhillips
Database:
EDM Alaska NSK Sandbox
Company:
ConocoPhillips (Alaska) Inc. -Kup2
Project:
Kuparuk River Unit
Site:
Kuparuk 1 L Pad
Well:
1L-15
Wellbore:
1 L-15L1-01
Design:
1 L-151-1-01_wp03
ConocoPhillips
Planning Report
Local Co-ordinate Reference:
TVD Reference:
MD Reference:
North Reference:
Survey Calculation Method:
Well 1L-15
Mean Sea Level
1L-15 @ 118.00usft (Parker141)
True
Minimum Curvature
Casing Points
Measured Vertical Casing Hole
Depth Depth Diameter Diameter
(usft) (usft) Name (in) (in)
9,300.00 6,000.70 2 3/8" 2.375 3.000
WG.I
BAKER
HUGHES
Plan Annotations
Measured
Vertical
Local Coordinates
Depth
Depth
+N/-S
+E/-W
(usft)
(usft)
(usft)
(usft)
Comment
6,540.00
5,936.16
-903.11
-1,099.47
TIP/KOP
6,610.00
5,932.34
-913.22
-1,168.61
Start 7dls
6.760.00
5,925.48
-949.70
-1,313.73
3
6,960.00
5,925.48
-1,036.07
-1,493.57
4
7,110.00
5,929.04
-1,127.70
-1,612.01
5
7,310.00
5,938.52
-1,279.93
-1,740.61
6
7,610.00
5,956.57
-1,554.65
-1,855.49
7
7,850.00
5,966.77
-1,793.00
-1,872.01
8
3,050.00
5,969.17
-1,992.26
-1,881.56
9
8,150.00
5,970.37
-2,091.60
-1,892.44
10
8,275.00
5,974.34
-2,215.49
-1,907.59
11
8,375.00
5,979.49
-2,312.03
-1,932.92
12
8,575.00
5,986.40
-2,507.56
-1,971.90
13
8,725.00
5,989.02
-2,655.24
-1,996.85
14
9,025.00
5,994.28
-2,952.66
-2,019.42
15
9,300.00
6,000.70
-3,225.79
-2,035.92
Planned TD at 9300.00
1012512016 12:25:34PM Page 6 COMPASS 5000.1 Build 74
ConocoPhillips
ConocoPhillips (Alaska) Inc. -Kup2
Kuparuk River Unit
Kuparuk 1 L Pad
1 L-15
1 L-15L1-02
Plan: 1 L-15L1-02_wp00
Standard Planning Report
25 October, 2016
MAd"i"k-I
BAKER
HUGHES
ConocoPhillips
Database:
EDM Alaska NSK Sandbox
Company:
ConocoPhillips (Alaska) Inc. -Kup2
Project:
Kuparuk River Unit
Site:
Kuparuk 1 L Pad
Well:
1 L-15
Wellbore:
1 L-151_1-02
Design:
1 L-15L1-02_wp00
ConocoPhillips
Planning Report
Local Cc -ordinate Reference:
Well 1 L-15
TVD Reference:
Mean Sea Level
MD Reference:
1 L-15 @ 118.00usft (Parker 141)
North Reference:
True
Survey Calculation Method:
Minimum Curvature
Project Kuparuk River Unit, North Slope Alaska, United States
Map System: US State Plane 1927 (Exact solution) System Datum: Mean Sea Level
Geo Datum: NAD 1927 (NADCON CONUS) Using Well Reference Point
Map Zone: Alaska Zone 04 Using geodetic scale factor
rGFSI
BAKER
HUGHES
Site Kuparuk 1 L Pad
Site Position: Northing: 5,949,190.90usft Latitude: 70' 16' 19.650 N
From: Map Easting: 539,916.78 usft Longitude: 149° 40' 37.763 W
Position Uncertainty: 0.00 usft Slot Radius: 0.000 in Grid Convergence: 0.30 °
Well 1L-15
Well Position +N/-S 0.00 usft Northing: 5,948,581.09 usft Latitude: 70' 16' 13.652 N
+E/-W 0.00 usft Easting: 539,922.94 usft Longitude: 149' 40' 37.678 W
Position Uncertainty 0.00 usft Wellhead Elevation: usft Ground Level: 83.20 usft
Wellbore 1 L-151-1-02
Magnetics Model Name Sample Date Declination Dip Angle Field Strength
(1) (1) (nT)
BGGM2016 12/1/2016 17.86 80.91 57,543
Design 1 L-15L1-02_wp00
Audit Notes:
Version: Phase: PLAN Tie On Depth: 6,380.00
Vertical Section: Depth From (TVD) +N/-S +E/-W Direction
(usft) (usft) (usft) (1)
-83.20 0.00 0.00 0.00
1012512016 12:27.12PM Page 2 COMPASS 5000.1 Build 74
GonocoPhillips MAP..
ConocoPhiliips Planning Report RAKW
HUGHES
Database:
EDM Alaska NSK Sandbox
Local Co-ordinate Reference:
Well 1 L-15
Company:
GonocoPhillips (Alaska) Inc. -Kup2
TVD Reference:
Mean Sea Level
Project:
Kuparuk River Unit
MD Reference:
1L-15 @ 118.00usft (Parker 141)
Site:
Kuparuk I Pad
North Reference:
True
Well:
1L-15
Survey Calculation Method:
Minimum Curvature
Wellbore:
1 L-15L1-02
Design:
1 L-15L1-02_wp00
Plan Sections
Measured
TVD Below
Dogleg
Build
Turn
Depth
Inclination
Azimuth
System
+N/-S
+E/-W
Rate
Rate
Rate
TFO
(usft)
(°)
(°)
(usft)
(usft)
(usft)
(°/100ft)
(°/100ft)
(°/100ft)
(°) Target
6,380.00
56.21
232.71
5,912.65
-826.65
-966.98
0.00
0.00
0.00
0.00
6,450.00
84.21
232.71
5,936.11
-866.16
-1.018.86
40.00
40.00
0.00
0.00
6,630.00
90.11
304.60
5,946.42
-869.79
-1,186.89
40.00
3.28
39.94
88.00
6,700.00
90.53
309.48
5,946.03
-827.63
-1,242.75
7.00
0.61
6.97
85.00
6,770.00
90.53
314.38
5,945.38
-780.87
-1,294.80
7.00
0.00
7.00
90.00
6,870.00
87.03
320.45
5.947.51
-707.30
-1,362.41
7.00
-3.50
6.07
120.00
6,995.00
91.42
328.02
5,949.19
-605.97
-1,435.38
7.00
3.51
6.06
60.00
7,095.00
97.15
332.06
5,941.72
-519.64
-1,485.16
7.00
5.73
4.04
35.00
7,195.00
94.71
338.66
5,931.38
-429.28
-1,526.58
7.00
-2.44
6.60
110.00
7,295.00
93.71
345.61
5,924.03
-334.41
-1,557.15
7.00
-1.01
6.95
98.00
7,455.00
93.63
356.83
5,913.76
-176.87
-1,581.49
7.00
-0.04
7.01
90.00
8,065.00
89.29
39.33
5,897.44
389.40
-1,396.36
7.00
-0.71
6.97
95.00
8,365.00
89.34
18.33
5,901.08
650.71
-1,252.49
7.00
0.02
-7.00
-90.00
8,440.00
84.40
16.53
5,905.17
722.14
-1,230.07
7.00
-6.58
-2.40
-160.00
8,515.00
88.96
13.91
5,909.51
794.36
-1,210.42
7.00
6.07
-3.50
-30.00
8,630.00
91.04
6.13
5,909.52
907.51
-1,190.43
7.00
1.81
-6.76
-75.00
8,700.00
90.61
11.01
5,908.51
976.70
-1,179.99
7.00
-0.61
6.97
95.00
8,825.00
87.62
2.79
5,910.43
1,100.66
-1,164.99
7.00
-2.39
-6.58
-110.00
8,950.00
87.65
11.55
5,915.60
1,224.46
-1,149.42
7.00
0.02
7.01
90.00
9,100.00
79.08
5.44
5,932.93
1,371.60
-1,127.38
7.00
-5.71
-4.07
-145.00
9,250.00
89.58
5.44
5,947.73
1,519.99
-1,113.26
7.00
7.00
0.00
0.00
9,430.00
97.65.
15.14
5,936.37
1,696.40
-1,081.31
7.00
4.48.
5.39
50.00
9,580.00
92.32
6.05
5,923.32
1,843.08
-1,053.91
7.00
-3.55
-6.06
-120.00
9,680.00
88.82
12.11
5,922.33
1,941.76
-1.038.13
7.00
-3.51
6.06
120.00
9,880.00
88.85
358.11
5,926.42
2,140.43
-1,020.36
7.00
0.02
-7.00
-90.00
10,200.00
88.94
20.52
5,932.68
2,454.14
-968.91
7.00
0.03
7.00
90.00
1012512016 12:27:12PM Page 3 COMPASS 5000.1 Build 74
ConocoPhillips .e..
ConocoPhillips Planning Report BAKER
HUGHES
Database:
EDM Alaska NSK Sandbox
Local Co-ordinate Reference:
Well 1L-15
Company:
ConocoPhillips (Alaska) Inc. -Kup2
TVD Reference:
Mean Sea Level
Project:
Kuparuk River Unit
MD Reference:
1 L-15 @ 118.00usft (Parker 141)
Site:
Kuparuk I Pad
North Reference:
True
Well:
1L-15
Survey Calculation Method:
Minimum Curvature
Wellbore:
1L-151-1-02
Design:
1 L-15L1-02_wp00
Planned Survey
Measured
TVD Below
Vertical
Dogleg
Toolface
Map
Map
Depth
Inclination
Azimuth
System
+N/-S
+E/-W
Section
Rate
Azimuth
Northing
Easting
(usft)
(°)
(1
(usft)
(usft)
(usft)
(usft)
(0/100ft)
(°)
(usft)
(usft)
6,380.00
56.21
232.71
5.912.65
-826.65
-966.98
-826.65
0.00
0.00
5,947,749.41
538,960.46
TIP
6,450.00
84.21
232.71
5,936.11
-866.16
-1,018.86
-866.16
40.00
0.00
5,947,709.63
538,908.79
KOP
6,630.00
90.11
304.60
5,946.42
-869.79
-1,186.89
-869.79
40.00
88.00
5,947,705.11
538,740.80
Start 40 dls
8,700.00
90.53
309.48
5,946.03
-827.63
-1,242.75
-827.63
7.00
85.00
5,947,746.96
538,684.72
End 40
dls, Start 7 dls
6,770.00
90.53
314.38
5,945.38
-780.87
-1,294.80
-780.87
7.00
90.00
5,947,793.44
538,632.43
5
6,870.00
87.03
320.45
5,947.51
-707.30
-1,362.41
-707.30
7.00
120.00
5,947,866.64
538,564.43
6
6,995.00
91.42
328.02
5,949.19
-605.97
-1.435.38
-605.97
7.00
60.00
5,947,967.57
538,490.93
7
7,095.00
97.15
332.06
5,941.72
-519.64
-1,485.16
-519.64
7.00
35.00
5,948,053.64
538,440.71
8
7,195.00
94.71
338.66
5,931.38
-429.28
-1.526.58
-429.28
7.00
110.00
5,948,143.76
538,398.81
9
7,295.00
93.71
345.61
5,924.03
-334.41
-1,557.15
-334.41
7.00
98.00
5,948,238.45
538,367.74
10
7,455.00
93.63
356.83
5,913.76
-176.87
-1,581.49
-176.87
7.00
90.00
5,948,395.85
538,342.57
11
8,065.00
89.29
39.33
5,897.44
389.40
-1,396.36
389.40
7.00
95.00
5,948,963.04
538,524.68
12
8,365.00
89.34
18.33
5,901.08
650.71
-1,252.49
650.71
7.00
-90.00
5,949,225.09
538,667.14
13
8,440.00
84.40
16.53
5,905.17
722.14
-1,230.07
722.14
7.00
-160.00
5,949,296.62
538,689.18
14
8,515.00
88.96
13.91
5,909.51
794.36
-1,210.42
794.36
7.00
-30.00
5,949,368.94
538,708.44
15
8,630.00
91.04
6.13
5,909.52
907.51
-1,190.43
907.51
7.00
-75.00
5,949,482.19
538,727.83
16
8,700.00
90.61
11.01
5,908.51
976.70
-1,179.99
976.70
7.00
95.00
5,949,551.42
538,737.90
17
8,825.00
87.62
2.79
5,910.43
1,100.66
-1,164.99
1,100.66
7.00
-110.00
5,949,675.45
538,752.25
18
8,950.00
87.65
11.55
5,915.60
1,224.46
-1,149.42
1,224.46
7.00
90.00
5,949,799.31
538,767.16
19
9,100.00
79.08
5.44
5,932.93
1,371.60
-1,127.38
1,371.60
7.00
-145.00
5,949,946.56
538,788.41
20
9,250.00
89.58
5.44
5,947.73
1,519.99
-1,113.26
1,519.99
7.00
0.00
5,950,095.00
538,801.74
21
9,430.00
97.65
15.14
5,936.37
1,696.40
-1,081.31
1,696.40
7.00
50.00
5,950,271.56
538,832.76
22
9,580.00
92.32
6.05
5,923.32
1,843.08
-1,053.91
1,843.08
7.00
-120.00
5,950,418.37
538,859.37
23
9,680.00
88.82
12.11
5,922.33
1,941.76
-1,038.13
1,941.76
7.00
120.00
5,950,517.12
538,874.63
24
9,880.00
88.85
358.11
5,926.42
2,140.43
-1,020.36
2,140.43
7.00
-90.00
5,950,715.86
538,891.34
25
10,200.00
88.94
20.52
5,932.68
2,454.14
-968.91
2,454.14
7.00
90.00
5,951,029.82
538,941.12
10/25/2016 12:27.12PM Page 4 COMPASS 5000.1 Build 74
ConocoPhillips
Database:
EDM Alaska NSK Sandbox
Company:
ConocoPhillips (Alaska) Inc. -Kup2
Project:
Kuparuk River Unit
Site:
Kuparuk 1 L Pad
Well:
1L-15
Wellbore:
1 L-151-1-02
Design:
1 L-151-1-02_wp00
ConocoPhillips
Planning Report
Local Co-ordinate Reference:
TVD Reference:
MD Reference:
North Reference:
Survey Calculation Method:
Well 1 L-15
Mean Sea Level
iL-15 @ 118.00usft (Parker 141)
True
Minimum Curvature
His
BAKER
HUGHES
Planned Survey
Measured TVD Below Vertical Dogleg Toolface Map Map
Depth Inclination Azimuth System +N/-S +E/-W Section Rate Azimuth Northing Easting
(usft) (°) (°) (usft) (usft) (usft) (usft) (°/100ft) (°) (usft) (usft)
Planned TD at 10200.00
1012512016 12:27:12PM Page 5 COMPASS 5000.1 Build 74
ConocoPhillips reA..
ConocoPhillips Planning Report BAKER
HUGHES
Database:
EDM Alaska NSK Sandbox
Company:
ConocoPhillips (Alaska) Inc. -Kup2
Project:
Kuparuk River Unit
Site:
Kuparuk 1L Pad
Well:
1L-15
Wellbore:
1 L-15L1-02
Design:
1 L-15L1-02_wp00
Targets
Local Co-ordinate Reference:
TVD Reference:
MD Reference:
North Reference:
Survey Calculation Method:
Well 1L-15
Mean Sea Level
1 L-15 @ 118.00usft (Parker 141)
True
Minimum Curvature
Target Name
hit/miss target Dip Angle Dip Dir. TVD +Nl-S +E/-W Northing Easting
Shape (1) V) (usft) (usft) (usft) (usft) (usft)
1L-151-1_Fault3 0.00 0.00 5,941.00-5,360.221,138,894.48 5,949,262.00
- plan misses target center by 1139870.47usft at 6380.00usft MD (5912.65 TVD,-826.65 N,-966.98 E)
- Polygon
Point 1 5,941.00 0.00 0.00 5,949,262.00
Point 2 5,941.00 1.00 1.00 5,949,263.01
1L-151-1_Faultl_M 0.00 0.00 0.00-6,611.351,138,514.80 5,948,009,00
- plan misses target center by 1139511.80usft at 6380.00usft MD (5912.65 TVD,-826.65 N,-966.98 E)
- Rectangle (sides W1,000.00 H1.00 D0.00)
1L-15L1-01_Faultl_M 0.00 0.00 0.00-8,085.131,138,253.95 5,946,534.00
plan misses target center by 1139259.40usft at 6380.00usft MD (5912.65 TVD,-826.65 N,-966.98 E)
Rectangle (sides W1,000.00 1-11.00 D0.00)
1L-15L1 Faultl 0.00 0.00 5,928.00-6,611.351,138,514.80 5,948,009.00
plan misses target center by 1139496.46usft at 6380.00usft MD (5912.65 TVD,-826.65 N,-966.98 E)
Polygon
Point 1 5,928.00 0.00 0.00 5,948,009.00
Point 2 5,928.00 1.00 1.00 5,948,010.01
1L-15L1-02_T01 0.00 0.00 5,933.00-3,842.441,139,157.56 5,950,781.00
plan misses target center by 1140128.52usft at 6380.00usft MD (5912.65 TVD,-826.65 N,-966.98 E)
Point
1L-15 CTD Polygon Sou
0.00 0.00 0.00
-7,318.271,139,240.13
5,947,306.00
- plan misses target center by 1140240.92usft at 6380.00usft MD (5912.65 TVD,-826.65 N. -966.98 E)
Polygon
Point 1
0.00
0.00
0.00
5,947,306.00
Point 2.
0.00
-130.08
-368.72
5,947,173.98
Point
0.00
-192.21
-536.07
5,947,110.97
Point 4
0.00
-378.39
-696.07
5,946,923.96
Point 5
0.00
-580.00
-774.13
5,946,721.96
Point
0.00
-898.95
-789.81
5,946,402.96
Point
0.00
-1,245.77
-832.64
5,946,055.95
Point
0.00
-1,641.47
-897.72
5,945,659.95
Point 9
0.00
-2,231.27
-948.83
5.945,069.95
Point 10
0.00
-2,488.29
-950.18
5,944,812.95
Point 11
0.00
-2,403.13
-1,359.78
5,944,895.93
Point12
0.00
-1,903.52
-1,274.14
5,945,395.94
Point13
0.00
-1,438.66
-1,236.70
5,945,860.94
Point 14
0.00
-827.83
-1,191.48
5,946,471.94
Point 15
0.00
-418.01
-1,148.32
5,946,881.95
Point16
0.00
-112.79
-993.70
5,947,187.95
Point 17
0.00
135.99
-756.37
5,947,437.96
Point 18
0.00
266.58
-484.65
5,947,569.98
Point 19
0.00
368A7
-81.07
5,947,674.00
Point 20
0.00
0.00
0.00
5,947,306.00
1,678,718.00
1,678,718.00
1,678,718.99
1,678,345.00
1,678,092.00
1, 678, 345.00
1, 678, 345.00
1, 678, 345.99
1, 678, 973.00
1, 679, 074.00
1,679,074.00
1,678,706.01
1,678, 539.01
1,678,380.02
1, 678, 303.03
1, 678, 289.05
1, 678, 248.06
1,678,185.09
1,678,137.11
1,678,137.12
1,677,727.12
1, 677, 810.10
1,677,845.07
1, 677, 887.04
1, 677, 928.03
1, 678, 081.01
1, 678, 316.99
1, 678, 587.99
1, 678, 990.98
1, 679, 074.00
Latitude Longitude
70° 1' 20.105 N 140° 32' 53.233 W
70°V8.514N 140' 33'9.378 W
70' 0' 54.586 N 140° 33' 23.098 W
70° 1' 8.514 N 140' 33' 9.378 W I
70° 1' 34.456 N 140° 32' 39.250 W I
70° V 0.586 N 140° 32' 51.816 W I
1 L-151-1_Fault3_M 0.00 0.00
0.00
-5,360.221,138,894.48
5,949,262.00
1,678,718.00 70' V 20.105 N 140' 32' 53.233 W
plan misses target center by 1139885.81 usft at
6380.00usft MD (5912.65 TVD,-826.65 N,-966.98 E)
Rectangle (sides W1,000.00 1-11.00 D0.00)
1L-15 CTD Polygon Nora 0.00 0.00
0.00
-7,311.271,139,240.17
5,947,313.00
1,679,074.00 700 V 0.654 N 1400 32' 51.785 W
- plan misses target center by 1140240.92usft at
6380.00usft MD (5912.65 TVD,-826.65 N,-966.98 E)
- Polygon
Point
0.00
0.00 0.00
5,947,313.00
1,679,074.00
Point
0.00
-75.99-194.42
5,947,235.99
1,678,880.00
Point
0.00
9.52-479.00
5,947,319.98
1,678,595.00
Point
0.00
246.78-713.78
5,947,555.97
1,678,358.99
Point 5
0.00
622.80-899.83
5,947,930.96
1.678,170.97
Point
0.00
977.12-952.97
5,948,284.96
1,678,115.95
1012512016 12:27:12PM Page 6 COMPASS 5000.1 Build 74
ConocoPhillips
ConocoPhillips Planning Report
Database:
EDM Alaska NSK Sandbox
Local Co-ordinate Reference:
Company:
ConocoPhillips (Alaska) Inc. -Kup2
TVD Reference:
Project:
Kuparuk River Unit
MD Reference:
Site:
Kuparuk 1 L Pad
North Reference:
Well:
1L-15
Survey Calculation Method:
Wellbore:
1L-151-1-02
Design:
1 L-15L1-02_wp00
Well 1 L-15
Mean Sea Level
1 L-15 @ 118.00usft (Parker 141)
True
Minimum Curvature
Has
BAKER
HUGHES
Point?
0.00
1,261.70
-868.47
5,948,569.95
1,678,198.94
Point
0.00
1,648.28
-588.41
5,948,957.97
1,678,476.91
Point
0.00
2,418.87
-494.35
5,949,728.98
1,678,566.88
Point 10
0.00
2,759.46
-409.55
5,950,069.98
1,678,649.86
Point 11
0.00
3,417.93
-294.08
5,950,728.99
1,678,761.82
Point 12
0.00
3,660.55
-216.80
5,950,971.99
1,678,837.81
Point 13
0.00
3,645.42
-1.85
5,950,958.00
1.679,052.82
Point14
0.00
3,423.14
45.99
5,950,736.00
1,679,101.83
Point 15
0.00
3,069.33
2.12
5,950,382.00
1,679,059.84
Point 16
0.00
2,715.70
-75.74
5,950,027.99
1,678,983.86
Point 17
0.00
2,403.12
-161.39
5,949,714.99
1,678,899.88
Point 18
0.00
2,077.02
-149.11
5,949,389.00
1,678,913.89
Point 19
0.00
1,765.13
-177.75
5,949,076.99
1,678,886.91
Point20
0.00
1,459.80
-311.37
5,948,770.98
1,678,754.92
Point21
0.00
1,127.83
-515.13
5,948,437.97
1,678,552.95
Point22
0.00
925.99
-550.20
5,948.235.97
1,678,518.95
Point23
0.00
592.57
-475.94
5,947,902.98
1,678,594.97
Point24
0.00
390.71
-316.98
5,947,701.98
1,678,754.98
Point25
0.00
354.47
-81.15
5,947,667.00
1,678.990.98
Point26
0.00
0.00
0.00
5,947,313.00
1,679,074.00
1L-151-1 Fault2 M 0.00 0.00
0.00
-5,758.571,138,763.35
5,948,863.00
1,678,589.00 70° V 16.430 N 140' 32' 58.665 W
- plan misses target center by 1139756.33usft
at 6380.00usft MD (5912.65 TVD,-826.65 N,-966.98 E)
- Rectangle (sides W1,000.00 H1.00 D0.00)
1L-151-1_Fault2 0.00 0.00
5,923.00
-5,758.571,138,763.35
5,948,863.00
1,678,589.00 70° V 16.430 N 140° 32' 58.665 W
plan misses target center by 1139741.00usft at 6380.00usft
MD (5912.65 TVD,-826.65 N,-966.98 E)
Polygon
Point 1
5,923.00
0.00
0.00
5,948,863.00
1.678,589.00
Point 2
5,923.00
1.00
1.00
5,948,864.01
1,678,589.99
1L-151-1-01_Faultl 0.00 0.00
5,992.00
-8,085.131,138,253.95
5,946,534.00
1,678,092.00 70' 0' 54.586 N 140" 33' 23.098 W
plan misses target center by 1139244.06usft at 6380.00usft
MD (5912.65 TVD,-826.65
N,-966.98 E)
Polygon
Point 1
5,992.00
0.00
0.00
5,946,534.00
1,678,092.00
Point
5,992.00
1.00
1.00
5,946,535.01
1,678,092.99
Casing Points
Measured Vertical Casing Hole
Depth Depth Diameter Diameter
(usft) (usft) Name (in) (in)
10,200.00 5,932.68 2 3/8" 2 375 3.000
10/25/2016 12:27:12PM Page 7 COMPASS 5000.1 Build 74
`-
ConocoPhillips
FIRS
ConocoPhillips
Planning Report
BAKER
HUGHES
Database: EDM Alaska NSK Sandbox
Local Co-ordinate Reference:
Well 1 L-15
Company: ConocoPhillips (Alaska) Inc. -Kup2
ND Reference:
Mean Sea Level
Project: Kuparuk River Unit
MD Reference:
1 L-15 @ 118.00usft (Parker 141)
Site: Kuparuk 1L Pad
North Reference:
True
Well: 1 L-15
Survey Calculation Method:
Minimum Curvature
Wellbore: 1 L-15L1-02
Design: 1 L-15L1-02_wp00
Plan Annotations
Measured
Vertical
Local Coordinates
Depth
Depth
+Nl-S
+El-W
(usft)
(usft)
(usft)
(usft)
Comment
6,380.00
5,912.65
-826.65
-966.98
TIP
6,450.00
5,936.11
-866.16
-1,018.86
KOP
6,630.00
5,946.42
-869.79
-1,186.89
Start 40dls
6,700.00
5,946.03
-827.63
-1,242.75
End 40 dls, Start 7 dls
6,770.00
5,945.38
-780.87
-1,294.80
5
6,870.00
5,947.51
-707.30
-1,362.41
6
6,995.00
5,949.19
-605.97
-1,435.38
7
7,095.00
5,941.72
-519.64
-1,485.16
8
7,195.00
5,931+38
-429.28
-1,526.58
9
7,295.00
5,924.03
-334.41
-1,557.15
10
7,455.00
5,913.76
-176.87
-1,581.49
11
8,065.00
5,897.44
389.40
-1,396.36
12
8,365.00
5,901.08
650.71
-1,252.49
13
8,440.00
5,905.17
722.14
-1,230.07
14
8,515.00
5,909.51
794.36
-1,210.42
15
8,630.00
5,909.52
907.51
-1,190.43
16
8,700.00
5,908.51
976.70
-1,179.99
17
8,825.00
5,910.43
1,100.66
-1,164.99
18
8,950.00
5,915.60
1,224.46
-1,149.42
19
9,100.00
5,932.93
1,371.60
-1,127.38
20
9,250.00
5,947.73
1,519.99
-1,113.26
21
9,430.00
5,936.37
1,696.40
-1,081.31
22
9,580.00
5,923.32
1,843.08
-1,053.91
23
9,680.00
5,922.33
1,941.76
-1,038.13
24
9,880.00
5,926.42
2,140.43
-1,020.36
25
10,200.00
5,932.68
2,454.14
-968.91
Planned TD at 10200.00
1012512016 12:27.12PM Page 8 COMPASS 5000.1 Build 74
KUP PROD
1 L-15
l..onocOf''nimps r
Well Attributes Max
Angle & MD TD
Alaska. Inc.
Wellbore API/UWI Field Name W¢Ilba a Status ncl (')
500292120400 KUPARUK RIVER UNIT PROD 46.58
MD (RKB) Act
6.7X00l
Bim IRKS)
6,705.0
•••
Comment H2S (ppm) Date
50 12/21/2015
Annalalton End Dale
Last WO:
KB-Grd (ftI Rig Release Date
34.80 10/24/1984
1L.15, 10119120162:15:37 PM
Vertical schematic (actual
-_-....... _..... _.... ._...._....._.-_.._._.............___............-........__..._....._.
Annotation Depth (ftKB) End Dat¢
Last Tag: SLM 6,372.0 4/24l2015
Annotation
Rev Reason: TAG, H2S, GLV C/O, SET PLUG
Last Mod By End
& ppmven
Date
10/5/2016
CATCHER, CUT TU81NG(3X)
Hanger: 27.6
Being trmgs
Casing Description
CONDUCTOR
OD (in) ID (in)
16
15.060
Top (ftKB)
35.0
Set Depth (ftKB)
102.0
Set Depth (TVD)...
102.0
WI1Len (I...
62.50
Gmde
H-40
Top Thread
WELDED
Casing Description
SURFACE
OD (In) ID (in)
9 5/8
8.921
Top (ftKB)
34.3
Set Depth (ftKB)
3,475.0
Set Depth (TVD)...
3,474.7
Wt/Lan (I...
36.00
Grade
J-55
Top Thneed
BTC
Casing Description
PRODUCTION
OD (in) ID (in)
7
6.276
Top (RKB)
34.3
Set Depth (ftKB)
6,704.0
Sel Depth (TVO)...
6,265.1
Wt/Len (I...
26.00
Gmd¢
J-55
Top Thread
Tubing Strings
CONDUCTOR; 35.0-102.0
Tubing Description string Ma... ID (in)
Upper Selective 31/2 2.992
Top (ftKB)
0.0
Set Depth (ft..
6,285.3
Set Depth (TVD) (...
5,962.4
Wt (Ib/ft) Grade
9.30 L-80
Top
EUE
Connection
8rd Mod
Completion
Completion Details
Mandrel, 2,424.5
Top (ftKB)
Top (TVD) (ftKB)
Top Incl
(°) Item Des
Co.
Nominal ID
(in)
27.6
27.6
0.00
Hanger
Tubing Hanger, FMC TC-IA-EN, 7-1116" x 3-1/2" EUE 8rd
2.950
Box x Box
SURFACE; 34.3-3475.0
6,027.5
5,755.8
35.60
Locator
Locator Sub, Baker, GBH-22
3.000
6,028.5
5,756.6
35.56
Seal Assembly
Seal Assembly, Baker, 80-40 (Seal Assy 21.54' Total
3.000
Length)
Mandrel; 3,494.0
6,035.3
5,762.2
35.26
Polished Bore
Receptacle
PER, Baker, 8040 (shear release pinned at 40K)
4.000
6,079.6
5,798.4
35.44
Nipple - DB,
X Nipple, HES, 2.813"
2.813
XN, DS, D
Mand,04,373.E
6,213.3
5,906.0
37.51
Carbide Blast
Blast Joint. 9.3# L-80 3%EUEM box x 3% HYD 511 pin
2.992
Rings
6,245.0
5,931.0
38.30
Carbide Blast
Rings
Blastjoint 3%9.3# L-80 HYD 511 box X pin
2-992
Mandrel; 5.062.8
6,283.8
5,961.3
39.27
Locator
Locator Sub, Baker, GBH-22
3.000
6,284.3
5,961.E
39.28
Seal Assembly
Seal Assembly, Baker, 80-40 (seal assembly 11.77')
3.000
Mandrel; 5,594.E
Tubing Descdption String Ma... ID (in) lop (ftKB) Set Depth (ft.. Set Depth (ND) (... Wt (Ib/fQ Gmde Top Connection
Lower Completion 5.9E 2.992 6,285.3 6,345.4 6,008.4 Bid EUE
Completion Details
Top (ftKB)
Top (TVD) (RKB)
Top Ind
(°) Item Des
Co.
Namtn.1 ID
(in)
6,288.6
5,965.0
39.39
SBE (Seal
Baker 80-401226'SBE
4.000
Mandrel; 5,970.7
Bore
Extension)
6,307.8
5,979.7
39.86
Deployment
Upper Wedge Assembly #2
2.992
Sleeve
Locator; 6,027.5
6,321.8
5,990.4
40.21
Nipple -DB,
XN, DS, D
GX Nipple, HES, 2.813", SN: 7256
2.813
seal Assemby; 6,026.5
Polished Be. Receptacle;
6,035.3
6,327.5
5,994.8
40.35
Deployment
Sleeve
Lower Wedge Assembly#1
2.992
Packer (Tubing); 6,057.7
6,341.5
6,005.4
40.69
Nipple - DB,
GX Nipple, HES, 2.813" w/PXX plug and prong SN:
2.813
XN, DS, D
6,344.9
6,008.0
40.77
Mule Shoe
WLEG 4.57" OD x 3" ID. Drifted 2,91".
2.992
Other In Hole (WireBne retrievable plugs, valves, pumps, fish, etc.)
Top (TVD) Top
Incl
MaMrel; 6,122.9
Top (ftKB)
IRKS)
(°) Des
Co.
Run Date
ID (in)
6,480.0
6,108.0
43.44 Fish
Packer& tubing tail from 6313' milled and chased 10/11/2016
down to 6480'. Prior to Setting Tandem Wedge & F
Perm Packer
6,520.0
6,136.9
44.24 FISH
JK Running Tool 4.5" x 1.2" OD, lost 8/24/2004 8/24/2004
Mandrel; 6.194.2
6,526.0
6,141.2
44.38 FISH
Parts of 2 Broken GL In Rathole; Also Trash around 2/14/1990
Mandrels
Carbide BlastRirgs; 6,213.3
Perforations & Slots
IPERF; 6,235.0-6,248.0-
Shol
IPERF 6Rings;-6.245.0�_
Carbide Blast Rings; fi,245.0
Top (RKB)
Blm (ftKB)
)
Top KB)
(ftKB)
Btm (TVD)
(ftKB)
Zone
Date
(shots/f
0
Type
Core
6,235.0
6,248.0
5,923.1
5,933.4 C-4,
1 L-15
3/7/1985
12.0
IPERF 5"
Scalloped Guns, 120
deg,
phasing
Locator,6,283.8
6,248.0
6,268.0
5,933.4
5,949.0 C-4,
1L-15
3/7/1985
12.0
IPERF 5"
Scalloped Guns, 120
Seal Assemby; 6,284.3
deg.
phasing
Packer(Tubing); 6.285.3
6,393.0
6,416.0
6,044.1
6,0612 A-5,1L-15
317/1985
4.0
IPERF 4"JJ
11, 120 deg.
SBE (Seal Be,, ate.:ion);
phasing
6,288-6
XO Reducing (Tubing); 6,298.0
Mandrel Inserts
St
Ili
Deployment Sleeve; 6,307.8
on
N Top (ftKB)
Top (TVD)
(ftKB)
Make
Model
OD (in)
So,
Valve
Type
Latch Port
Type
Size
(in)
TRO Run
(psi)
Run Date
Core
Nipple - DB, XN, DS, O; 6,321.8
1 2,424.5
2,424.3
Camco
MMG
11/2
DMY
10/14/2016
2 3,494.0
3,493.7
Camco
MMG
1112
SOV
10/14/2016
Deployment sleeve; 6,327.5
3 4,373.6
4,337.8
Camco
MMG
1112
DMY
10/14/2016
Nipple - DB, XN, Ds, D; 6,341.5
4 5,062.9
4,944.3
Camco
MMG
1 1/2
DMY
10/14/2016
Mule Shoe; 6,344.9
5 5,594.6
5,400.6
Camco
MMG
11/2
DMY
10/14/2016
iPERF; 6,393.0-6,416.0-
6 5,970.7
5,709.3
Camco
MMG
1112
DMY
10/14/2016
7 6,122.9
5,833.6
Camco
MMG
11/2
DMY
10/14/2016
FISH; 6.620.0
8 6,194.2
5,890.8
Camco
MMG
1112
DMY
10/14/2016
FISH; 6,526.0
PRODUCTION; 34.3-6,704.0
1 L-15 CTD Proposed Schematic
16" 62." H-40
9-518" 3e.r J-55
shoe @ 3475' RID
CS -send peas
8235-B259' MD
33C' RSD proposed
s D'.N'S depth
A5-ssnd perk:
8393-641a'MO
r 2M J-55 shoe
@ 67D4' MD
3-112" 9.3# L-80 EUE 8rd Tubing to surface
3-1t2" Camco gas lift mandrels @ TBD
Baker packer @ XXXX' MD
Production Mandrel at XXXX' MD
Baker packer at XXXX' MD (below C-sand perfs)
Baker SBE at XXXXIVID
3-112" X-nipple — x)W MD (2.812" min ID)
Northern Solutions WEDGE (see details)
1L-15L1-02
TD @ 102CU RID
'ner top @ 6326 RID
@ 92CT AID
-r top @ e= R4D
1!.-iFL1
D @ 10.2C0' A1D
Liner 10—A @ 6549 ID
TRANSMITTAL LETTER CHECKLIST
WELL NAME: U — 011
PTD: C2 f (o
✓Development _ Service _ Exploratory _ Stratigraphic Test Non -Conventional
FIELD: t POOL: t Iv6r D,
Check Box for Appropriate Letter / Paragraphs to be Included in Transmittal Letter
CHECK
OPTIONS
TEXT FOR APPROVAL LETTER
/
MULTI
The permit is for a new wellbore segment of existing well Permit
/
LATERAL
No. JR q — , API No. 50-QZ9 - a i ao y -11-6 - 0Q .
r
(If last two digits
Production should continue to be reported as a function of the original
in API number are
API number stated above.
between 60-69)
In accordance with 20 AAC 25.005(f), all records, data and logs
acquired for the pilot hole must be clearly differentiated in both well
Pilot Hole
name ( PH) and API number (50- -
- -� from records, data and logs acquired for well
(name on permit).
The permit is approved subject to full compliance with 20 AAC 25.055.
Approval to produce/inject is contingent upon issuance of a conservation
Spacing Exception
order approving a spacing exception. (Company Name) Operator
assumes the liability of any protest to the spacing exception that may
occur.
All dry ditch sample sets submitted to the AOGCC must be in no greater
Dry Ditch Sample
than 30' sample intervals from below the permafrost or from where
samples are first caught and 10' sample intervals through target zones.
Please note the following special condition of this permit:
production or production testing of coal bed methane is not allowed for
Non -Conventional
(name of well) until after (Company Name) has designed and
Well
implemented a water well testing program to provide baseline data on
water quality and quantity. (Company Name) must contact the AOGCC
to obtain advance approval of such water well testing program.
Regulation 20 AAC 25.071(a) authorizes the AOGCC to specify types of
well logs to be run. In addition to the well logging program proposed by
(Company Name) in the attached application, the following well logs are
also required for this well:
Well Logging
Requirements
Per Statute AS 31.05.030(d)(2)(B) and Regulation 20 AAC 25.071,
composite curves for well logs run must be submitted to the AOGCC
within 90 days after completion, suspension or abandonment of this well.
Revised 2/2015
WELL PERMIT CHECKLIST Field & Pool KUPARUK RIVER, KUPARUK RIV OIL - 490100
PTD#: 2161360 Company CONOCOPHILLIPS ALASKA INC _ _ Initial Class/Type
Well Name: KUPARUK RIV UNIT 1 L-15L1-01 Program DEV Well bore seg
DEV / PEND GeoArea 89QUnit 11160 On/Off Shore On Annular Disposal
Administration
17
Nonconven, gas conforms to AS31.05.030Q.1_.A),Q.2.A-D)
NA_
1
Permit fee attached
NA
2
Lease number appropriate_ - - - - - - - -
Yes
ADL0025659, entire wellbore.
3
Unique well name and number
Yes
KRU 1 L-15L1-01 - -
4
Well.located in a_defined-pool _ - - - - -
Yes
KUPARUK RIVER,-KUPARUK RIV OIL.- 490100,.governed by Conservation_ Order No. 432D.
5
Well located proper distance from drilling unit -boundary_
Yes
CO 432D contains no spacing restrictions with respect to drilling unit boundaries. .
6
Well located proper distance from other wells_
Yes
CO 432D has no interwell_spacing _restrictions._
7
Sufficient acreage -available in drilling unit_
Yes
8
If deviated, is wellbore plat included
Yes
9
Operator only affected party- - - _ - - - - - _ -
Yes -
Wellbore_will be more than 500' from an external property line where_ ownership or landownership_ changes..
10
Operator has appropriate bond in force
Yes
Appr Date
11
Permit can be issued -without conservation order - _ _ _ _ _
Yes
12
Permit can be issued without administrative_appr_oval _
Yes
PKB 10l28l2016
- - - -
_
- - - - - - - - -
13
Can permit be approved before 15-day wait_ - - -
Yes -
14
Well _located within area and strata authorized by Injection Order# (put_10# in- comments)_(For_
NA- -
- - - - - - - - - - - - - - - - - ----------------------------------------------------
15
All wells.within 1/4 mile -area -of review identified (For service well only). - - - - - - -
NA_
- - - - - - - -
16
Pre -produced injector. duration -of preproduction less than 3 months- (For _service well only)
NA_
18
Conductor string- provided - - - - -
Conductorset_in 1L-15-- - - - - - - - -
Engineering
19
Surface casing protects all -known _ USDWs - - .. -
NA
Surface casing set in 1-L-15-..-Fully cemented.
20
CMT vol adequate to circul_ate_on conductor & surf _csg - - - -
NA_
21
CMT vol adequate_ to tie -in -long string to -surf csg
NA
22
CMT_will coverall known_productive horizons- - - -
Yes
- - - - - - - - - - - - - - - - - - -
23
Casing designs adequate for CJ-, B &-permafrost_ - - - - - - - - - - - - - -
Yes .
2 3/8" slotted liner will be set in the lateral ._
24
Adequate tankage or reserve pit - - - - -
Yes
All drilling waste t_o be transported to approved disposal wells,
I25
.lf-a_re-drill, has_a 1.07403 for abandonment been approved
NA_ -
- - - Motherbore not abandoned...- drilling laterals, and keeping original perforations.. ... .
26
Adequate wellbore separation -proposed - - - - - - - - - - - - - -
Yes ...
.. anti collision_ anaylsis prov_ided._ No issues - - - - - - - - -
27
If_diverter required, does it meet regulations- - - - - - - - - - - - - - - - - - -
NA
Wellhead in place. -BOPE_ will be placed on top of prod tree,
Appr Date
28
-Drilling fluid_ program schematic_& equip -list _adequate _ - - - . _ .
Yes
Max formation_ pressure= 3702_psi_( 12.1 ppg EMW) Will drill with 8.6 ppg mud_ but maintain11.8pg with MPD-
GLS 11/10/2016
29
B_OPEs,_do they meet regulation ... - .. - - -
Yes
CDR3 has 5000 psi BOPE - - - - - - - - -
30
BOPE press rating appropriate; test to -(put psig in comments)_
Yes
MASP = 311.4_psi_ Will test BOPE to 3500 psi --- ----------------------------
31
Choke_manifold complies w/API_RP-53 (May 84)_ - - - - - - _ _ _
Yes
- - - - - - - - -
32
Work will occur without operation shutdown_ - -
Yes
- -
33
.Is presence_ of H2S gas_ probable - - - - -
Yes
H2S on pad._ Rig_has sensors and alarms.
34
Mechanical_ condition of wells within AOR verified (For service well only) - - - - -
N_A
35
Permit can be issued w/o hydrogen_ sulfide measures
No_ -
- - - - WelIs_cn-lL-Pad are H2S bearing._ H2S measures required.
Geology
36
Data presented on- potential overpressure zones
Yes
Maximum potential -reservoir pressure_is 12.1 ppg _EMW;_will be drilled using _8.6 ppg mud and MPD technique.
Appr Date
37
Seismic analysis- of shallow gas_zones_ - - - - - - - - - - - - - - -
N_A_ -
- - - - - - -
PKB 11/10/2016
38
Seabed condition survey -(if off_ -shore) - - - - - - .
NA
.
39
Contact name/phone for weekly_ progress reports- [exploratory only]
NA
Onshore development -lateral -to be drilled_.
Geologic Engineering Public 1 L-1511-01 is second lateral. Will drill south of motherbore BHL to target A5 sand. GIs
Commissioner: Date: Commissioner: Date Commissio Date
n