Alaska Logo
Department of Commerce, Community, and Economic Development
Alaska Oil and Gas Conservation
Commission
Loading...
HomeMy WebLinkAbout216-136Guhl, Meredith D (DOA) From: Guhl, Meredith D (DOA) Sent: Monday, November 26, 2018 9:37 AM To: 'Callahan, Mike S' Cc: Loepp, Victoria T (DOA); Boyer, David L (DOA) Subject: KRU 1L-15 L1, L1-01, L1-02 PTDs 216-135, 216-136, 216-138, Permits Expired Hello Mike, The following Permits to Drill, issued to ConocoPhillips Alaska, have expired under Regulation 20 AAC 25.005 (g). The PTDs will be marked expired in the AOGCC database. • KRU 1L-15 L1, PTD 216-135, Issued 18 November 2016 • KRU 1L-15 L1-01 PTD 216-136, Issued 18 November 2016 • KRU 1L-15 1-1-02, PTD 216-138, Issued 18 November 2016 If you have any questions, please contact me. Thank you, Meredith Meredith Guhl Petroleum Geology Assistant Alaska Oil and Gas Conservation Commission 333 W. 7th Ave, Anchorage, AK 99501 meredith.guhl@alaska.gov Direct: (907) 793-1235 CONFIDENTIALITY NOTICE: This e-mail message, including any attachments, contains information from the Alaska Oil and Gas Conservation Commission (AOGCC), State of Alaska and is for the sole use of the intended recipient(s). It may contain confidential and/or privileged information. The unauthorized review, use or disclosure of such information may violate state or federal law. If you are an unintended recipient of this e-mail, please delete it, without first saving or forwarding it, and, so that the AOGCC is aware of the mistake in sending it to you, contact Meredith Guhl at 907-793-1235 or meredith.guhl@aiaska.gov. THE STATE "UAIV Mal b GOVERNOR BILL WALKER Gary Eller CTD Team Lead ConocoPhillips Alaska, Inc. P.O. Box 100360 Anchorage, AK 99510-0360 Alaska a Oil and , d i .. Conservation Co ' o 333 West Seventh Avenue Anchorage, Alaska 99501-3572 Main: 907.279.1433 Fax: 907.276.7542 www.aogcc.alaska.gov Re: Kuparuk River Field, Kuparuk River Oil Pool, KRU 1L-15L1-01 ConocoPhillips Alaska, Inc. Permit to Drill Number: 216-136 Surface Location: 387' FNL, 143' FEL, SEC. 31, TI 1N, RIOE, UM Bottomhole Location: 3613' FNL, 2190' FEL, SEC. 31, T11N, RIDE, UM Dear Mr. Eller: Enclosed is the approved application for permit to re -drill the above referenced development well. The permit is for a new wellbore segment of existing well Permit No. 184-183, API No. 50-029- 21204-00-00. Production should continue to be reported as a function of the original API number stated above. This permit to drill does not exempt you from obtaining additional permits or an approval required by law from other governmental agencies and does not authorize conducting drilling operations until all other required permits and approvals have been issued. In addition, the AOGCC reserves the right to withdraw the permit in the event it was erroneously issued. Operations must be conducted in accordance with AS 31.05 and Title 20, Chapter 25 of the Alaska Administrative Code unless the AOGCC specifically authorizes a variance. Failure to comply with an applicable provision of AS 31.05, Title 20, Chapter 25 of the Alaska Administrative Code, or an AOGCC order, or the terms and conditions of this permit may result in the revocation or suspension of the permit. Sincerely, Daniel T. Seamount, Jr. Commissioner DATED this day of November, 2016. RECEIVED STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMMISSION PERMIT TO DRILL 20 AAC 25.005 O C 1 2 7 2016 .AOGCC CD 3 1 a. Type of Work: 1 b. Proposed Well Class: Exploratory - Gas ❑ Service - WAG ❑ Service - Disp 1 c. Specify if well is proposed for: Drill [_1' Lateral Q Stratigraphic Test ❑ Development - Oil - Service - Winj ❑ Single Zone 8 Coalbed Gas ❑ Gas Hydrates ❑ Redrill ❑ Reentry ❑ Exploratory - Oil ❑ Development - Gas ❑ Service - Supply ❑ Multiple Zone Geothermal ❑ Shale Gas ❑ 2. Operator Name: 5. Bond: Blanket Q . Single Well ❑ 11. Well Name and Number: ConocoPhillips Alaska Inc Bond No. 5952180 . IX_ 1 L-15L1-01 3. Address: 6. Proposed Depth: 12. Field/Pool(s): P.O. Box 100360 Anchorage, AK 99510-0360 MD: 9300' TVD 6001' Kuparuk River Field / 4a. Location of Well (Governmental Section): 7. Property Designation (Lease Number): Surface: 387' FNL, 143' FEL, Sec 31, T11N, R10E, UM - ADL 25659, Kuparuk Oil Pool Top of Productive Horizon: 8. Land Use Permit: 13. Approximate Spud Date: 1214' FNL, 11 13'FEL, Sec 31, T11N, R10E, UM ALK 2585 11/4/2016 Total Depth: 9. Acres in Property: 14. Distance to Nearest Property: 3613' FNL, 2190' FEL, Sec 31, T11N, R10E, UM 2490 14350' 4b. Location of Well (State Base Plane Coordinates - NAD 27): 10. KB Elevation above MSL (ft): 118' 15. Distance to Nearest Well Open Surface: x- 539923 y- 5949191 Zone- 4 GL Elevation above MSL (ft): 8% r 301 to Same Pool: 124' (1 L-13) 16. Deviated wells: Kickoff depth: 6540 feet ' 17. Maximum Potential Pressures in psig (see 20 AAC 25.035) Maximum Hole Angle: 95 degrees - Downhole: 3702 Surface: 3114 18. Casing Program: Specifications Top - Setting Depth - Bottom Cement Quantity, c.f. or sacks Hole Casing Weight Grade Coupling Length MD TVD MD TVD (including stage data) 3" 2-3/8" 4.7# L-80 ST-L 2920' 6380' 5912' 9300' 6001' N/A 19. PRESENT WELL CONDITION SUMMARY (To be completed for Redrill and Re -Entry Operations) Total Depth MD (ft): Total Depth TVD (ft): Plugs (measured): Effect. Depth MD (ft): Effect. Depth TVD (ft): Junk (measured): 6705' 6266' N/A 6704' 6265' Fish - 6480' Casing Length Size Cement Volume MD TVD Conductor/Structural 102' 16" 214 sx Cold Set II 102' 102' Surface 3475' 9-5/8" 1025 sx AS 111 & 700 sx Class G 3475' 3475' Intermediate Production 6704' 1 7" 275 sx Class G & 250 sx AS 1 6704 16265' Liner Perforation Depth MD (ft): 6235- 6268' Perforation Depth TVD (ft): 5923' - 5949' 6393' - 6416' 6044' - 6061' 20. Attachments: Property Plat ❑ BOP Sketch ❑ Drilling Program 0 Time v. Depth Plot ❑ Shallow Hazard Analysis❑ Diverter Sketch ❑ Seabed Report ❑ Drilling Fluid Program Q 20 AAC 25.050 requirements0 21. Verbal Approval: Commission Representative: Date 22. 1 hereby certify that the foregoing is true and the procedure approved herein will not Mike Callahan 263-4180 Contact A111 be deviated from without prior written approval. Email mike.callahan(cDcop.com Printed Name Gary Eller Title CTD Team Lead Signature Phone Zb - 2- Date \ Zb Commission Use Only Permit to Drill API Number: Permit Approval See cover letter for other Number: ' I - 50- - a0�-( QO Date: /I— 1'i6 -I Le requirements. Conditions of approval : If box is checked, well may not be used to explore for, test, or produce coalbed methanF, gas hydrates, or gas contained in shales: Other: 3 5�;� ��� �� ke--_ f Samples req'd: Yes ❑ No[�/J Mud log req'd: Yes Q No[� �/ HZS measures: Yes LrC1J No Directional svy req'd: Yes Lrl�Jt No L Spacing exception req'd: Yes ❑ No Inclination -only svy req'd: Yes❑ Noy / lC -� {/ n� , h�- �/to, 4� Post initial injection MIT req'd: Yes❑ No❑ APPROVED BY // Approved by: COMMISSIONER THE COMMISSION Date: all! S'1 4,6 Form 10-401 (Revised 11/2015) ORIGINAL Submit Form and This permit is val'd for 24 months from the date of approval (20 AAC 25.005(g)) Attachments in Duplicate r ConocoPhillips p Alaska P.O. BOX 100360 ANCHORAGE, ALASKA 99510-0360 October 26, 2016 Commissioner - State of Alaska Alaska Oil & Gas Conservation Commission 333 West 7th Avenue Suite 100 Anchorage, Alaska 99501 Dear Commissioner: ConocoPhillips Alaska, Inc. hereby submits applications for permits to drill 3 laterals out of the Kuparuk Well 1 L- 15 using the coiled tubing drilling rig, Nabors CDR3-AC. To account for geological uncertainties, ConocoPhillips requests a variance from the requirements of 20 AAC 25.015 to allow the actual kick-off point to be anywhere along the length of the parent lateral instead of being limited to 500' from the original point. Attached to this application are the following documents: 10-401 Applications for 1L-151-1, 1L-151-1-01, and 1L-15L1-02 Detailed Summary of Operations Directional Plans for 1L-15L1, 1L-151-1-01, and 1L-15L1-02 Proposed CTD Schematic If you have any questions or require additional information, please contact me at 907-263-4180. Sincerely, A � Mike Callahan ConocoPhillips Alaska Coiled Tubing Drilling Engineer Kuparuk CTD Laterals NABORS ALASKA 1 L-15L1, 1 L-15L1-01 & 1 L-15L1-02 G13� Application for Permit to Drill Document 2RC 1. Well Name and Classification...........................................................................................................2 (Requirements of 20 AAC 25.005(o and 20 AAC 25.005(b))......................................................................................................................2 2. Location Summary.............................................................................................................................2 (Requirements of 20 AAC 25.005(c)(2)).............................................................................................................................. .....................2 3. Blowout Prevention Equipment Information...................................................................................2 (Requirements of 20 AAC 25.005 (c)(3)).....................................................................................................................................................2 4. Drilling Hazards Information and Reservoir Pressure....................................................................2 (Requirements of 20 AAC 25.005(c)(4)).....................................................................................................................................................2 5. Procedure for Conducting Formation Integrity tests.....................................................................2 (Requirements of 20 AAC 25.005(c)(5))......................................................................................................................................................2 6. Casing and Cementing Program......................................................................................................3 (Requirements of 20 AAC 25.005(c)(6))......................................................................................................................................................3 7. Diverter System Information.............................................................................................................3 (Requirements of 20 AAC 25.005(c)(7))......................................................................................................................................................3 8. Drilling Fluids Program.....................................................................................................................3 (Requirements of 20 AAC 25.005(c)(8))......................................................................................................................................................3 9. Abnormally Pressured Formation Information...............................................................................4 (Requirements of 20 AAC 25.005(c)(9))......................................................................................................................................................4 10. Seismic Analysis.................................................................................................................................4 (Requirements of 20 AAC 25.005(c)(10))....................................................................................................................................................4 11. Seabed Condition Analysis...............................................................................................................4 (Requirements of 20 AAC 25.005(c)(11))....................................................................................................................................................4 12. Evidence of Bonding.........................................................................................................................4 (Requirements of 20 AAC 25.005(c)(12))....................................................................................................................................................4 13. Proposed Drilling Program...............................................................................................................4 (Requirements of 20 AAC 25.005(c)(13))....................................................................................................................................................4 Summaryof Operations.................................................................................................................................................. 4 LinerRunning.................................................................................................................................................................. 6 14. Disposal of Drilling Mud and Cuttings.............................................................................................6 (Requirements of 20 AAC 25.005(c)(14))................................................................................................................................................. 6 15. Directional Plans for Intentionally Deviated Wells..........................................................................6 (Requirements of 20 AAC 25.050(b)).......................................................................................................................................................... 6 16. Attachments.......................................................................................................................................6 Attachment 1: Directional Plans for 1L-15L1, 1L-15L1-01 & 1L-15L1-02 laterals........................................................... 6 Attachment 2: Current Well Schematic for 1 L-15........................................................................................................... 6 Attachment 3: Proposed Well Schematic for 1 L-15L1, 1 L-15L1-01 & 1 L-15L1-02 laterals ............................................. 6 Page 1 of 6 October 26, 2016 PTD Application: 1 L-151-1, 1 L-151-1-01 & 1 L-151-1-02 1. Well Name and Classification (Requirements of 20 AAC 25.005(f) and 20 AAC 25.005(b)) The proposed laterals described in this document are 11--151-1, 1L-15L1-01 & 1L-15L1-02. All laterals will be classified as producer wells. 2. Location Summary (Requirements of 20 AAC 25.005(c)(2)) These laterals will target the A sand package in the Kuparuk reservoir. See attached 10-401 form for surface and subsurface coordinates of the 1 L-151-1, 1 L-151-1-01 & 1 L-151-1-02. 3. Blowout Prevention Equipment Information (Requirements of 20 AAC 25.005 (c)(3)) Please reference blowout prevention (BOP) schematics on file with the Commission for Nabors CDR3-AC. BOP equipment is as required per 20 AAC 25.036 for thru-tubing drilling operations. — Pipe rams, blind rams and the CT pack off will be pressure tested to 250 psi and to 3,500 psi. Using the maximum formation pressure in the area of 3702 psi in 1 L-16 (i.e. 12.1 ppg EMW), the maximum potential surface pressure in 1 L-15, assuming a gas gradient of 0.1 psi/ft, would be 3102 psi. See the "Drilling Hazards Information and Reservoir Pressure" section for more details. — The annular preventer will be tested to 250 psi and 2,500 psi. 4. Drilling Hazards Information and Reservoir Pressure (Requirements of 20 AAC 25.005 (c)(4)) Reservoir Pressure and Maximum Downhole Pressure (Requirements of 20 AAC 25.005 (c)(4)(a)) The formation pressure in KRU 1 L-15 was measured to be 2962 psi (9.5 ppg EMW) on 4/24/2015. The maximum downhole pressure in the 1 L-15 vicinity is to the south in the 1 L-16 injector at 3702 psi (12.1 ppg EMW) from May of 2014. The 1L-151-1-01 sidetrack will be drilled south and could encounter formation pressure from 1 L-16. Potential Gas Zones (Requirements of 20 AAC 25.005 (c)(4)(b)) Wells on 1 L pad have injected gas, so there is a chance of encountering free gas while drilling the 1 L-15 laterals. If significant gas is detected in the returns the contaminated mud can be diverted to a storage tank away from the rig. Potential Causes of Hole Problems (Requirements of 20 AAC 25.005 (c)(4)(c)) The major expected risk of hole problems in the 1 L-15 laterals will be shale instability across faults. Managed pressure drilling (MPD) will be used to reduce the risk of shale instability associated with fault crossings. 5. Procedure for Conducting Formation Integrity tests (Requirements of 20 AAC 25.005(c)(5)) The 1 L-15 laterals will be drilled under 20 AAC 25.036 for thru-tubing drilling operations so a formation integrity test is not required. Page 2 of 6 October 26, 2016 PTD Application: 1 L-151-1, 1 L-151-1-01 & 1 L-151_1-02 6. Casing and Cementing Program (Requirements of 20 AAC 25.005(c)(6)) New Completion Details Lateral (dame Liner Top Liner Btm Liner Top Liner Btm Liner Details MD MD TVDSS TVDSS 1 L-15L1 6540' 10200' 5940' 5995' 2-3/8", 4.7#, L-80, ST-L slotted liner; aluminum billet on top 1L-15L1-01 6380, 9300' 5912' 6001' 2-3/8", 4.7#, L-80, ST-L slotted liner; aluminum billet on to 1 L-15L1-02 6325' 10200' 5879' 5933' 2-3/8", 4.7#, L-80, ST-L slotted liner; de to ment sleeve on to Existing Casing/Liner Information Category OD Weight (ppf) Grade Connection Top MD Btm MD Top TVD Btm TVD Burst psi Collapse psi Conductor 16" 62.5 H-40 Welded 0' 102' 0' 102' 1640 670 Surface 9-5/8" 36.0 J-55 BTC 0' 3475' 0' 3475' 3520 2220 Production 7" 26.0 J-55 BTC 0' 6704' 0' 6265' 4980 4320 Tubing 3-1/2" 9.3 L-80 EUE-8RD 0 6345 0 6008' 10160 10530 7. Diverter System Information (Requirements of 20 AAC 25.005(c)(7)) Nabors CDR3-AC will be operating under 20 AAC 25.036, for thru-tubing drilling operations. Therefore, a diverter system is not required. 8. Drilling Fluids Program (Requirements of 20 AAC 25.005(c)(8)) Diagram of Drilling System A diagram of the Nabors CDR3-AC mud system is on file with the Commission. Description of Drilling Fluid System — Window milling operations: Water -based Power-vis milling fluid (8.6 ppg) — Drilling operations: Water -based Flo -Pro drilling mud (8.6 ppg). This mud weight will not hydrostatically overbalance the reservoir pressure, overbalanced conditions will be maintained using MPD practices described below. — Completion operations: The well will be loaded with 11.8 ppg potassium formate completion fluid in order to provide formation over -balance and well bore stability while running completions. If higher pressure is encountered, potassium formate will be used to provide over -balance. Managed Pressure Drilling Practice Managed pressure drilling (MPD) techniques will be employed to maintain a constant overbalanced pressure on the open hole formation and promote wellbore stability throughout the coiled tubing drilling (CTD) process. Mud weight is not, in many cases, the primary well control barrier. This is satisfied with the 5,000 psi rated coiled tubing pack off and MPD choke. BOPE equipment provides the secondary well control as detailed in section 3 "Blowout Prevention Equipment Information". In the 1 L-15 laterals we will target a constant BHP of 11.8 ppg EMW at the window. The constant BHP target will be adjusted through choke pressure and/or mud weight increases to maintain overbalanced conditions if increased reservoir pressure is encountered. Additional choke pressure or increased mud weight may also be employed for improved borehole stability. Any change of circulating friction pressure due to change in pump rates or change in depth of circulation will be offset with back pressure adjustments. Page 3 of 6 October 26, 2016 PTD Application: 1 L-15L1, 1 L-151-1-01 & 1 L-151-1-02 Pressure at the 1 L-15 Window (6330' MD, 6001' TVD) Using MPD Pumps On 1.5 b m Pumps Off A -sand Formation Pressure 9.5 ) 2965 psi 2965 psi Mud Hydrostatic 8.6 2684 psi 2684 psi Annular friction i.e. ECD, 0.090 si/ft 570 psi 0 psi Mud + ECD Combined (no choke pressure) 3254 psi 2684 psi underbalanced —281psi) Target BHP at Window (11.8 pp) 3683 psi 3683 psi Choke Pressure Required to Maintain Target BHP 429 psi 999 psi 9. Abnormally Pressured Formation Information (Requirements of 20 AAC 25.005(c)(9)) N/A - Application is not for an exploratory or stratigraphic test well. 10. Seismic Analysis (Requirements of 20 AAC 25.005(c)(10)) N/A - Application is not for an exploratory or stratigraphic test well. 11. Seabed Condition Analysis (Requirements of 20 AAC 25.005(c)(11)) N/A - Application is for a land based well. 12. Evidence of Bonding (Requirements of 20 AAC 25.005(c)(12)) Evidence of bonding for ConocoPhillips Alaska, Inc. is on file with the Commission. 13. Proposed Drilling Program (Requirements of 20 AAC 25.005(c)(13)) Summary of Operations Background KRU well 1L-15 is a Kuparuk A Sand producer equipped with 3-1/2" tubing and 7" production casing. The CTD sidetrack will utilize three laterals to target the A4/A5 Sands to north and A5 Sand to the south of 1L- 15. A rig workover was performed to install anew upper completion with a tandem wedge assembly. Prior to CTD operation, an inner wedge will be set at 6330' MD. Nabors CDR3-AC will kick-off at 6330' MD. All three laterals will be completed with 2-3/8" slotted liner from TD with the last lateral liner top located inside the tubing tail. The 1L-15L1 northern lateral will exit the big tail pipe at 6330' MD and TD at 10200' MD, targeting the A4 and A5 sands. It will be completed with 2-3/8" slotted liner from TD up to 6540'MD with an aluminum billet for kicking off the 1 L-15L 1-01. The 1L-15L1-01 lateral will drill to the south to a TD of 9300' MD targeting the A5 sand. It will be completed with 2-3/8" slotted liner frorn TLS up to 6380' MD with an aluminum billet for kicking off the 1L-15L1-02. Page 4 of 6 October 26, 2016 PTD Application: 1 L-15L1, 1 L-151_1-01 & 1 L-15L1-02 The 1L-15L1-02 lateral will drill to the north to a TD of 10,200' MD targeting the A4 and A5 sands. It will be completed with slotted liner from TD to 6325' MD in the tubing tail with a deployment sleeve. Pre-CTD Work 1. RU Slickline: Obtain SBHP 2. RU E-line: Set inner wedge at 6330' MD. 3. Prep site for Nabors CDR3-AC and set BPV. Ric Work 1. MIRU Nabors CDR3-AC rig using 2" coil tubing. NU 7-1/16" BOPE, test. 2. 1L-15L1 Sidetrack (A4/A5 sand - North) i. Mill 2.80" window at 6330' MD. ii. Drill 3" bi-center lateral to TD of 10200' MD. iii. Run 2%" slotted liner with an aluminum billet from TD up to 6540' MD. 3. 1L-15L1-01 Lateral (A5 sand - South) ✓ i. Kick off of the aluminum billet at 6540' MD. ii. Drill 3" bi-center lateral to TD of 9300' MD. iii. Run 2%" slotted liner with aluminum billet from TD up to 6380' MD. 4. 1L-15L1-02 Lateral (A4/A5 sand - North) i. Kickoff of the aluminum billet at 6380' MD. ii. Drill 3" bi-center lateral to TD of 10200' MD. iii. Run 2%" slotted liner with deployment sleeve from TD up to 6325' MD. 5. Freeze protect, set BPV, ND BOPE, and RDMO Nabors CRD3-AC. Post -Rig Work 1. Pull BPV 2. Obtain SBHP 3. Install gas lift design 4. Put on production Pressure Deployment of BHA The planned bottom hole assemblies (BHAs) are too long to simply isolate by closing the double swab valves on the Christmas tree. MPD operations require the BHA to be lubricated under pressure using a system of double swab valves on the Christmas tree, double deployment rams, double check valves and double ball valves in the BHA, and a slick -line lubricator can be used. This pressure control equipment listed ensures there are always two barriers to reservoir pressure, both internal and external to the BHA, during the deployment process. During BHA deployment, the following steps are observed. — Initially the double swab valves on the tree are closed to isolate reservoir pressure. The lubricator is installed on the BOP riser with the BHA inside the lubricator. — Pressure is applied to the lubricator to equalize across the swab valves. The swab valves are opened and the BHA is lowered in place via slick -line. — When the BHA is spaced out properly, the double deployment rams are closed on the BHA to isolate reservoir pressure via the annulus. A closed set of double ball valves and double check valves isolate Page 5 of 6 October 26, 2016 PTD Application: 1 L-15L1, 1 L-151-1-01 & 1 L-151-1-02 reservoir pressure internal to the BHA. Slips on the double deployment rams prevent the BHA from moving when differential pressure is applied. The lubricator is removed once pressure is bled off above the deployment rams. — The coiled tubing is made up to the BHA with the double ball valves plus the double check valves in the closed position. Pressure is applied to the coiled tubing to equalize internal pressure and then the double ball valves are opened. The injector head is made up to the riser, annular pressure is equalized, and the deployment rams are opened. The BHA and coiled tubing are now ready to run in the hole. During BHA undeployment, the steps listed above are observed, only in reverse. Liner Running — The 1 L-15 laterals will be displaced to an overbalanced fluid (11.8 ppg potassium formate) prior to running liner. See "Drilling Fluids" section for more details. — While running 2-3/8" slotted liner, a joint of 2-3/8" non -slotted tubing will be standing by for emergency deployment. A floor valve is made up onto this joint ahead of time, and the rig crew conducts a deployment drill with this emergency joint on every slotted liner run. The 2-3/8" rams will provide secondary well control while running 2-3/8" liner. 14. Disposal of Drilling Mud and Cuttings (Requirements of 20 AAC 25.005(c)(14)) • No annular injection on this well. • All solid waste will be transported to the grind and inject facility at DS-4 Prudhoe Bay for disposal. • Incidental fluids generated from drilling operations will be injected in a Kuparuk Class II disposal well (1 R-18 or 1 B disposal facilities) or Prudhoe DS-4 if a Kuparuk facility is unavailable. • All wastes and waste fluids hauled from the pad must be properly documented and manifested. • Contact Kuparuk Environmental Coordinator for questions regarding waste classification. (670-4200). 15. Directional Plans for Intentionally Deviated Wells (Requirements of 20 AAC 25.050(b)) — The Applicant is the only affected owner. — Please see Attachment 1: Directional Plans — Magnetic and inclination surveys will be taken every 30 ft. No gyro will be run. — MWD directional, resistivity, and gamma ray will be run over the entire open hole section. ✓ — Distance to Nearest Property Line (measured to KPA boundary at closest point) Lateral Name Distance 1 L-15L1 16000, 1 L-151-1-01 14350' 1 L-151_1-02 16000' — Distance to Nearest Well within Pool Lateral Name Distance Well 1 L-15L1 167' 1 L-02 1 L-15L1-01 124' 1 L-13 1 L-15L1-02 136' 1 L-02 16.Attachments Attachment 1: Directional Plans for IL-15L1, 1L-15L1-01 & IL-15L1-02laterals Attachment 2: Current Well Schematic for 1L-15 Attachment 3: Proposed Well Schematic for IL-15L1, 1L-15L1-01 & IL-15L1-02laterals Page 6 of 6 October 26, 2016 ConocoPh i I I i ps ConocoPhillips (Alaska) Inc. -Kup2 Kuparuk River Unit Kuparuk 1L Pad 1 L-15 1 L-15L1 Plan: 1 L-15L1 wp02 Standard Planning Report 25 October, 2016 F i - I CA I'l BAKER HUGHES ConocoPhillips Database: EDM Alaska NSK Sandbox Company: ConocoPhillips (Alaska) Inc. -Kup2 Project: Kuparuk River Unit Site: Kuparuk 1 L Pad Well: 1L-15 Wellbore: 1 L-1511 Design: 1 L-15L1_wp02 ConocoPhillips Planning Report Local Co-ordinate Reference: Well 1L-15 TVD Reference: Mean Sea Level MD Reference: 1L-15 @ 118.00usft (Parker 141) North Reference: True Survey Calculation Method: Minimum Curvature Project Kuparuk River Unit, North Slope Alaska, United States Map System: US State Plane 1927 (Exact solution) System Datum: Mean Sea Level Geo Datum: NAD 1927 (NADCON CONUS) Using Well Reference Point Map Zone: Alaska Zone 04 Using geodetic scale factor ri.l BAKER HUGHES Site Kuparuk 1 L Pad Site Position: Northing: 5,949,190.90 usft Latitude: 70' 16' 19,650 N From: Map Easting: 539,916.78usft Longitude: 149' 40' 37.763 W Position Uncertainty: 0.00 usft Slot Radius: 0.000 in Grid Convergence: 0.30 ° Well 1L-15 Well Position +N/-S 0.00 usft Northing: 5,948,581.09 usft Latitude: 70' 16' 13.652 N +E/-W 0.00 usft Easting: 539,922.94 usft Longitude: 149' 40' 37.678 W Position Uncertainty 0.00 usft Wellhead Elevation: usft Ground Level: 83.20 usft Wellbore 1L-151_1 Magnetics Model Name Sample Date Declination Dip Angle Field Strength C) C) (nT) B G G M 2016 12/ 1 /2016 17.86 80.91 57,543 Design 1L-151_1_wp02 Audit Notes: Version: Phase: PLAN Tie On Depth: 6,300.00 Vertical Section: Depth From (TVD) +N/-S +E/-W Direction (usft) (usft) (usft) V) -83.20 0.00 0.00 0.00 1012512016 12:12:56PM Page 2 COMPASS 5000.1 Build 74 i ConocoPhillips Opal ConocoPhillips Planning Report BAKER HUGHES Database: EDM Alaska NSK Sandbox Local Co-ordinate Reference: Well 1 L-15 Company: ConocoPhillips (Alaska) Inc. -Kup2 TVD Reference: Mean Sea Level Project: Kuparuk River Unit MD Reference: 1 L-15 @ 118.00usft (Parker 141) Site: Kuparuk I Pad North Reference: True Well: 1L-15 Survey Calculation Method: Minimum Curvature Wellbore: 1 L-15L1 Design: 1 L-15L1_wp02 Plan Sections Measured TVD Below Dogleg Build Turn Depth Inclination Azimuth System +N/-S +E/-W Rate Rate Rate TFO (usft) (°) (°) (usft) (usft) (usft) (°/100ft) (°/100ft) (°/100ft) (°) Target 6,300.00 39.67 232.80 5,855.75 -792.86 -922.58 0.00 0.00 0.00 0.00 6,330.00 40.41 232.71 5,878.72 -804.54 -937.94 2.47 2.47 -0.30 -4.51 6,351.00 44.61 232.71 5,894.20 -813.13 -949.23 20.00 20.00 0.00 0.00 6,464.48 90.00 232.71 5,936.84 -874.91 -1,030.35 40.00 40.00 0.00 0.00 6,634.48 91.85 300.70 5,933.71 -884.15 -1,190.25 40.00 1.09 39.99 88.00 6,710.00 92.31 305.97 5,930.97 -842.69 -1,253.29 7.00 0.60 6.98 85.00 6,785.00 92.30 311.22 5,927.96 -795.96 -1,311.84 7.00 -0.01 7.01 90.00 6,860.00 89.67 315.77 5,926.67 -744.36 -1,366.22 7.00 -3.51 6.06 120.00 6,985.00 85.31 323.36 5,932.16 -649.41 -1,447.14 7.00 -3.49 6.08 120.00 7,110.00 89.71 330.93 5,937.59 -544.60 -1,514.81 7.00 3.52 6.06 60.00 7,210.00 95.44 334.96 5,933.10 -455.69 -1,560.22 7.00 5.73 4.03 35.00 7,310.00 93.02 341.55 5,925.72 -363.11 -1,597.14 7.00 -2.42 6.59 110.00 7,410.00 92.02 348.48 5,921.32 -266.67 -1,622.96 7.00 -0.99 6.94 98.00 7,570.00 91.98 359.69 5,915.70 -107.87 -1,639.41 7.00 -0.02 7.00 90.00 7,900.00 89.87 22.70 5,910.30 213.62 -1,575.78 7.00 -0.64 6.97 95.00 8,160.00 88.31 40.83 5,914.47 433.73 -1,439.51 7.00 -0.60 6.98 95.00 8,260.00 88.33 33.83 5,917.40 513.16 -1,378.93 7.00 0.01 -7.00 -90.00 8,560.00 88.44 12.82 5,925.97 786.99 -1,260.86 7.00 0.04 -7.00 -90.00 8,635.00 83.51 11.02 5,931.24 860.16 -1,245.41 7.00 -6.58 -2.41 -160.00 8,710.00 88.06 8.39 5,936.75 933.87 -1,232.82 7.00 6.07 -3.50 -30.00 8,825.00 90.15 0.62 5,938.55 1,048.40 -1,223.79 7.00 1.82 -6.76 -75.00 8,975.00 89.24 11.08 5,939.35 1,197.41 -1,208.53 7.00 -0.61 6.97 95.00 9,100.00 86.27 2.84 5,944.26 1,321.27 -1,193.40 7.00 -2.38 -6.59 -110.00 9,225.00 86.31 11.61 5,952.37 1,444.90 -1,177.73 7.00 0.03 7.01 90.00 9,375.00 77.74 5.47 5,973.18 1,591.58 -1,155.61 7.00 -5.71 -4.09 -145.00 9,525.00 88.24 5.47 5,991.45 1,739.57 -1,141.44 7.00 7.00 0.00 0.00 9,705.00 95.46 15.81 5,985.62 1,916.03 -1,108.32 7.00 4.01 5.75 55.00 9,855.00 90.16 6.73 5,978.24 2,062.76 -1,079.11 7.00 -3.53 -6.05 -120.00 9,955.00 86.67 12.80 5,981.01 2,161.22 -1,062.17 7.00 -3.49 6.07 120.00 10,200.00 86.82 355.62 5,995.03 2,404.24 -1,044.28 7.00 0.06 -7.01 -90.00 1012512016 12:12:56PM Page 3 COMPASS 5000.1 Build 74 ConocoPhillips ,el a. ConocoPhillips Planning Report BAKER HUGHES Database: EDM Alaska NSK Sandbox Local Co-ordinate Reference: Well 1 L-15 Company: ConocoPhillips (Alaska) Inc. -Kup2 TVD Reference: Mean Sea Level Project: Kuparuk River Unit MD Reference: 1L-15 @ 118.00usft (Parker 141) Site: Kuparuk 1 L Pad North Reference: True Well: 1 L-15 Survey Calculation Method: Minimum Curvature Wellbore: 1 L-15L1 Design: 1 L-15L1 _wp02 Planned Survey Measured TVD Below Vertical Dogleg Toolface Map Map Depth Inclination Azimuth System +N/-S +E/-W Section Rate Azimuth Northing Easting (usft) (°) (°) (usft) (usft) (usft) (usft) (°/100ft) (°) (usft) (usft) 6,300.00 39.67 232.80 5,855.75 -792.86 -922.58 -792.86 0.00 0.00 5,947,783.43 539,004.67 TIP 6,330.00 40.41 232.71 5,878.72 -804.54 -937.94 -804.54 2.47 -4.51 5,947,771.67 538,989.37 KOP 6,351.00 44.61 232.71 5,894.20 -813.13 -949.23 -813.13 20.00 0.00 5,947,763.02 538,978.13 End 20 dls, Start 40 dls 6,464.48 90.00 232.71 5,936.84 -874.91 -1,030.35 -874.91 40.00 0.00 5,947,700.81 538,897.34 4 6,634.48 91.85 300.70 5,933.71 -884.15 -1,190.25 -884.15 40.00 88.00 5,947,690.73 538,737.51 End 40 dls, Start 7 dls 6,710.00 92.31 305.97 5,930.97 -842.69 -1,253.29 -842.69 7.00 85.00 5,947,731.84 538,674.26 6 6,785.00 92.30 311.22 5,927.96 -795.96 -1,311.84 -795.96 7.00 90.00 5,947,778.26 538,615.47 7 6,860.00 89.67 315.77 5,926.67 -744.36 -1,366.22 -744.36 7.00 120.00 5.947,829.56 538,560.83 8 6,985.00 85.31 323.36 5,932.16 -649.41 -1,447.14 -649.41 7.00 120.00 5,947,924.07 538,479.41 9 7,110.00 89.71 330.93 5,937.59 -544.60 -1,514.81 -544.60 7.00 60.00 5,948,028.52 538,411.19 10 7,210.00 95.44 334.96 5,933.10 -455.69 -1,560.22 -455.69 7.00 35.00 5,948,117.18 538,365.31 11 7,310.00 93.02 341.55 5.925.72 -363.11 -1,597.14 -363.11 7.00 110.00 5,948,209.55 538,327.91 12 7,410.00 92.02 348.48 5,921.32 -266.67 -1.622.96 -266.67 7.00 98.00 5,948,305.85 538,301.58 13 7,570.00 91.98 359.69 5,915.70 -107.87 -1,639.41 -107.87 7.00 90.00 5,948,464.54 538,284.29 14 7,900.00 89.87 22.70 5,910.30 213.62 -1,575.78 213.62 7.00 95.00 5,948,786.33 538,346.21 15 8,160.00 88.31 40.83 5,914.47 433.73 -1,439.51 433.73 7.00 95.00 5,949,007.13 538,481.29 16 8,260.00 88.33 33.83 5,917.40 513.16 -1,378.93 513.16 7.00 -90.00 5,949,086.88 538,541.44 17 8,560.00 88.44 12.82 5,925.97 786.99 -1,260.86 786.99 7.00 -90.00 5,949,361.30 538,658.04 18 8,635.00 83.51 11.02 5,931.24 860.16 -1,245.41 860.16 7.00 -160.00 5,949,434.55 538,673.10 19 8,710,00 88.06 8,39 5.936.75 933.87 -1,232.82 933.87 7.00 -30.00 5,949,508.31 538,685.31 20 8,825.00 90.15 0.62 5,938.55 1,048.40 -1,223.79 1,048.40 7.00 -75.00 5,949,622.88 538,693.72 21 8,975.00 89.24 11.08 5,939.35 1,197.41 -1,208.53 1,197.41 7.00 95.00 5,949,771.96 538,708.19 22 9,100.00 86.27 2.84 5,944.26 1.321.27 -1,193.40 1,321.27 7.00 -110.00 5,949,895.88 538,722.66 23 9,225.00 86.31 11.61 5,952.37 1,444.90 -1,177.73 1,444.90 7.00 90.00 5,950,019.58 538,737.68 24 9,375.00 77.74 5.47 5,973.18 1,591.58 -1,155.61 1,591.58 7.00 -145.00 5,950,166.36 538,759.01 25 9,525.00 88.24 5.47 5,991.45 1,739.57 -1,141.44 1,739.57 7.00 0.00 5,950,314.41 538,772A0 1012512016 12:12:56PM Page 4 COMPASS 5000.1 Build 74 �- ConocoPhillips War FAI ConocoPhillips Planning Report BAKER HUGHES Database: EDM Alaska NSK Sandbox Company: ConocoPhillips (Alaska) Inc. -Kup2 Project: Kuparuk River Unit Site: Kuparuk 1 L Pad Well: 1L-15 Wellbore: 1 L-151-1 Design: 1 L-151-1_wp02 Local Co-ordinate Reference: TVD Reference: MD Reference: North Reference: Survey Calculation Method: Well 1 L-15 Mean Sea Level 1L-15 @ 118.00usft (Parker 141) True Minimum Curvature Planned Survey Measured TVD Below Vertical Dogleg Toolface Map Map Depth Inclination Azimuth System +N/-S +E/-W Section Rate Azimuth Northing Easting (usft) (a) (o) (usft) (usft) (usft) (usft) (°llooft) (1) (usft) (usft) 26 9,705.00 95.46 15.81 5,985.62 1,916.03 -1,108.32 1,916.03 7.00 55.00 5,950,491.03 538,804.58 27 9,855.00 90.16 6,73 5,978.24 2,062.76 -1,079.11 2,062.76 7.00 -120.00 5,950,637.90 538,833.01 28 9.955.00 86.67 12.80 5,981.01 2,161.22 -1,062.17 2,161.22 7.00 120.00 5,950,736.43 538,849.43 29 10,200.00 86.82 355.62 5,995.03 2,404.24 -1,044.28 2,404.24 7.00 -90.00 5,950,979.52 538,866.03 Planned TD at 10200.00 1012512016 12:12:56PM Page 5 COMPASS 5000.1 Build 74 ConocoPhillips HAR. ConocoPhillips Planning Report BAKER HUGHES Database: EDM Alaska NSK Sandbox Company: ConocoPhillips (Alaska) Inc. -Kup2 Project: Kuparuk River Unit Site: Kuparuk I Pad Well: 1L-15 Wellbore: 1 L-151-1 Design: 1 L-15L1_wp02 Targets Local Co-ordinate Reference: TVD Reference: MD Reference: North Reference: Survey Calculation Method: Well 1L-15 Mean Sea Level 1 L-15 @ 118.00usft (Parker 141) True Minimum Curvature Target Name hit/miss target Dip Angle Dip Dir. TVD +N/-5 +E/-W Northing Easting Shape (1) V) (usft) (usft) (usft) (usft) (usft) Latitude Longitude 1L-151-1_T04 0.00 0.00 5,942.00-6,900.471,138,532.27 5,947,720.00 plan misses target center by 1139471.22usft at 6300.00usft MD (5855.75 TVD,-792.86 N. -922.58 E) Point 1L-15L1_T09 0.00 0.00 5,930.00-5,498.981,138,845.74 5,949,123.00 plan misses target center by 1139778.03usft at 6300.00usft MD (5855.75 TVD,-792.86 N,-922.58 E) Point 11--151-1_Fault3 0.00 0.00 5,941.00-5,360.221,138,894.48 5,949,262.00 plan misses target center by 1139826.21 usft at 6300.00usft MD (5855.75 TVD,-792.86 N,-922.58 E) Polygon Point 1 5,941.00 0.00 0.00 5,949,262.00 Point 2 5,941.00 1.00 1.00 5,949,263.01 1L-151-1_T08 0.00 0.00 5,923.00-5,769.521,138,753.29 5,948,852.00 - plan misses target center by 1139686.74usft at 6300.00usft MD (5855.75 TVD,-792.86 N,-922.58 E) - Point 1L-15L1_Fault1_M 0.00 0.00 0.00-6,611.351,138,514.80 5,948,009.00 plan misses target center by 1139467.28usft at 6300.00usft MD (5855.75 TVD,-792.86 N,-922.58 E) Rectangle (sides W1,000.00 1-11.00 D0.00) 1L-151-1_T02 0.00 0.00 5,936.00-7,200.341,138,877.72 5,947,422.00 - plan misses target center by 1139818.31 usft at 6300.00usft MD (5855.75 TVD,-792.86 N,-922.58 E) - Point 11--151-1_T05 0.00 0.00 5,929.00-6,677.201,138,485.45 5,947,943.00 plan misses target center by 1139423.22usft at 6300.00usft MD (5855.75 TVD,-792.86 N,-922.58 E) Point 1L-151-1_T12 0.00 0.00 5,996.00 -4,520.741,139,009.94 5,950,102.00 - plan misses target center by 1139938.62usft at 6300.00usft MD (5855.75 TVD,-792.86 N,-922.58 E) - Point 1L-15L1-01_Faultl_M 0.00 0.00 0.00 -8,085.131,138,253.95 5,946,534.00 plan misses target center by 1139214.92usft at 6300.00usft MD (5855.75 TVD,-792.86 N,-922.58 E) Rectangle (sides W1,000.00 1-11.00 D0.00) 1L-151-1_T14 0.00 0.00 6.001.00 -3,903.131,139,097.23 5,950,720.00 plan misses target center by 1140024.06usft at 6300.00usft MD (5855.75 TVD,-792.86 N. -922.58 E) Point 1L-151-1_Faultl 0.00 0.00 5,928.00 -6,611.351,138,514.80 5,948,009.00 plan misses target center by 1139452.23usft at 6300.00usft MD (5855.75 TVD,-792.86 N,-922.58 E) Polygon Point 1 5,928.00 0.00 0.00 5,948,009.00 Point 2 5,923.00 1.00 1.00 5,948,010.01 1L-15 CTD Polygon Sou 0.00 0.00 0.00 -7,318.271,139.240.13 5,947,306.00 - plan misses target center by 1140196.42usft at 6300.00usft MD (5855.75 TVD,-792.86 N,-922.58 E) - Polygon Point 1 0.00 0.00 0.00 5,947,306.00 Point 0.00 -130.08-368.72 5,947,173.98 Point 3 0.00 -192.21-536.07 5,947,110.97 Point 4 0.00 -378.39-696.07 5,946,923.96 Point 5 0.00 -580.00-774.13 5,946,721.96 Point 6 0.00 -898.95-789.81 5,946,402.96 Point 0.00 -1,245.77-832.64 5,946,055.95 Point 0.00 -1,641.47-897.72 5,945,659.95 Point 0.00 -2,231.27-948.83 5,945,069.95 Point 10 0.00 -2,488.29-950.18 5,944,812.95 Point 11 0.00 -2,403.13-1,359.78 5,944,895.93 Point 12 0.00 -1,903.52-1,274.14 5,945,395.94 1, 678, 364.00 70' V 5.681 N 140' 33' 10.121 W I 1,678,670.00 70' 1' 18.829 N 140' 32' 55.212 W � 1,678,718.00 70° V 20.105 N 140° 32' 53.233 W 1, 678, 718.00 1, 678, 718.99 1,678,579.00 70' 1' 16.338 N 140- 32' 58.998 W 1,678,345.00 70' V 8.514 N 140- 33' 9.378 W 1,678,711.00 70° T 2.263 N 140° 33' 1.599 W 1,678,316.00 70° 1' 7.917 N 140' 33' 10.494 W 1,678,829.00 70' 1' 28.087 N 140- 32' 46.353 W 1,678,092.00 70° 0' 54.586 N 140° 33' 23.098 W 1,678,913.00 70' 1' 33.956 N 140- 32' 41.224 W I 1,678,345.00 1,678, 345.00 1,678, 345.99 1,679,074.00 1, 679, 074.00 1,678,706.01 1, 678, 539.01 1, 678, 380.02 1, 678, 303.03 1, 678, 289.05 1,678,248.06 1,678,185.09 1,678,137.11 1,678,137.12 1,677,727.12 1,677, 810.10 700 1' 8.514 N 140' 33' 9.378 W 70'V0.586N 140' 32'51.816 W I 1012512016 12-12:56PM Page 6 COMPASS 5000.1 Build 74 ConocoPhillips CAaI ConocoPhillips Planning Report BAKER HUGHES Database: EDM Alaska NSK Sandbox Company: ConocoPhillips (Alaska) Inc. -Kup2 Project: Kuparuk River Unit Site: Kuparuk 1L Pad Well: 1L-15 Wellbore: 1 L-15L1 Design: 1L-15L1_wp02 Local Co-ordinate Reference: TVD Reference: MD Reference: North Reference: Survey Calculation Method: Well 1L-15 Mean Sea Level 1L-15 @ 118.00usft (Parker 141) True Minimum Curvature Point13 0.00 -1,438.66 -1,236.70 5,945,860.94 1,677,845.07 Point 14 0.00 -827.83 -1,191.48 5,946,471.94 1,677,887.04 Point 15 0.00 -418.01 -1,148.32 5,946,881.95 1,677,928.03 Point 16 0.00 -112.79 -993.70 5,947,187.95 1,678,081.01 Point 17 0.00 135.99 -756.37 5,947,437.96 1,678,316.99 Point 18 0.00 266.58 -484.65 5,947,569.98 1,678,587.99 Point 19 0.00 368.47 -81.07 5,947,674.00 1,678,990.98 Point20 0.00 0.00 0.00 5,947,306.00 1,679.074.00 1L-151-1_Fault3_M 0.00 0.00 0.00 -5,360.221,138,894.48 5,949,262.00 1,678,718.00 70' V 20.105 N 140' 32' 53.233 W - plan misses target center by 1139841.25usft at 6300.00usft MD (5855.75 TVD,-792.86 N,-922.58 E) - Rectangle (sides W1,000.00 1-11.00 D0.00) 1 L-15 CTD Polygon Nort 0.00 0.00 0.00 -7,311.271,139,240.17 5,947,313.00 1,679,074.00 70' 1' 0.654 N 140' 32' 51.785 W - plan misses target center by 1140196.42usft at 6300.00usft MD (5855.75 TVD,-792.86 N,-922.58 E) Polygon Point 0.00 0.00 0.00 5,947,313.00 1,679,074.00 Point 0.00 -75.99-194.42 5,947,235.99 1,678,880.00 Point 0.00 9.52-479.00 5,947.319.98 1,678,595.00 Point 0.00 246.78-713.78 5,947,555.97 1,678,358.99 Point 5 0.00 622.80-899.83 5,947,930.96 1,678,170.97 Point 0.00 977.12-952.97 5,948,284.96 1,678,115.95 Point 0.00 1,261.70-868.47 5,948,569.95 1,678,198.94 Point 0.00 1,648.28-588.41 5,948,957.97 1.678,476.91 Point 9 0.00 2,418.87-494.35 5,949,728.98 1,678,566.88 Point 10 0.00 2,759.46-409.55 5,950,069.98 1,678,649.86 Point 11 0.00 3,417.93-294.08 5,950,728.99 1,678,761.82 Point 12 0.00 3,660.55-216.80 5,950,971.99 1,678,837.81 Point 13 0.00 3,645.42 -1.85 5,950,958.00 1.679,052,82 Point 14 0.00 3,423.14 45.99 5,950,736.00 1,679,101.83 Point 15 0.00 3,069.33 2.12 5,950,382.00 1,679,059.84 Point16 0.00 2,715.70 -75.74 5.950,027.99 1,678,983.86 Point 17 0.00 2,403.12-161.39 5,949,714.99 1,678,899.88 Point 18 0.00 2,077.02-149.11 5,949;389.00 1,678,913.89 Point 19 0.00 1,765.13-177.75 5,949,076.99 1,678,886.91 Point20 0.00 1,459.80-311.37 5,948,770.98 1,678,754.92 Point21 0.00 1,127.83-515.13 5,948,437.97 1,678,552.95 Point22 0.00 925.99-550.20 5.948,235.97 1,678,518.95 Point23 0.00 592.57-475.94 5,947,902.98 1,678,594.97 Point24 0.00 390.71-316.98 5,947,701.98 1,678,754.98 Point25 0.00 354.47 -81.15 5,947,667.00 1,678,990.98 Point26 0.00 0.00 0.00 5,947,313.00 1,679,074.00 1 L-151-1 T10 0.00 0.00 5,944.00 -5,374.081,138,867.40 5,949,248.00 1,678,691.00 70° V 20.010 N 140' 32' 54.062 W plan misses target center by 1139799. 1 9usft at 6300.00usft MD (5855.75 TVD,-792.86 N,-922.58 E) Point 1 L-151-1_T03 0.00 0.00 5,932.00 -7,158.421,138,704.92 5,947,463.00 1,678,538.00 70° V 2.923 N 140° 33' 6.325 W plan misses target center by 1139645.28usft at 6300.00usft MD (5855.75 TVD,-792.86 N,-922.58 E) Point 1L-15L1_T07 0.00 0.00 5,915.00 -6,066.811,138,613.70 5,948,554.00 1,678,441.00 70' 1' 13.656 N 140' 33' 4.236 W plan misses target center by 1139548.48usft at 6300.00usft MD (5855.75 TVD,-792.86 N,-922.58 E) Point 1 L-15L1_T13 0.00 0.00 5,982.00 -4,228.971,139,060.50 5,950,394.00 1,678,878.00 70° 1' 30.846 N 140° 32' 43.666 W plan misses target center by 1139988.26usft at 6300.00usft MD (5855.75 TVD,-792.86 N,-922.58 E) Point 1L-151-1_Fault2 M 0.00 0.00 0.00 -5,758.571,138,763.35 5,948,863.00 1,678,589.00 70° 1' 16A30 N 140' 32' 58.665 W plan misses target center by 1139711.79usft at 6300.00usft MD (5855.75 TVD,-792.86 N,-922.58 E) Rectangle (sides 011,000.00 1-11.00 D0.00) 1L-151-1 T01 0.00 0.00 5,943.00 -7,187.261,139,051.81 5,947,436.00 1,678,885.00 70° V 2.135 N 140' 32' 56,601 W plan misses target center by 1139992.32usft at 6300.00usft MD (5855.75 TVD,-792.86 N,-922.58 E) Point 1L-151-1_T06 0.00 0.00 5,920.00 -6,400.241,138,499.92 5,948,220.00 1,678,329.00 70' V 10.585 N 140° 33' 8.896 W 1012512016 12:12:56PM Page 7 COMPASS 5000.1 Build 74 y- ConocoPhillips r&.. ConocoPhillips Planning Report BAKER HUGHES Database: EDM Alaska NSK Sandbox Company: ConocoPhillips (Alaska) Inc. -Kup2 Project: Kuparuk River Unit Site: Kuparuk 1 L Pad Well: 1L-15 Wellbore: 1 L-151-1 Design: 1 L-1511_wp02 Point Local Co-ordinate Reference: TVD Reference: MD Reference: North Reference: Survey Calculation Method: Well 1 L-15 Mean Sea Level 1L-15 @ 118.00usft (Parker 141) True Minimum Curvature 1 L-151-1_T11 0.00 0.00 5,954.00-4,839.51 1,138,960.25 5,949,783.00 1,678,781.00 70' 1' 25.065 N 140' 32' 49.132 W plan misses target center by 1139890.01 usft at 6300.00usft MD (5855.75 TVD,-792.86 N. -922.58 E) Point 1L-15L1_Fault2 0.00 0.00 5,923.00-5,758.571,138,763.35 5,948,863.00 1,678,589.00 70' 1' 16.430 N 140' 32' 58.665 W plan misses target center by 1139696.75usft at 6300.00usft MD (5855.75 TVD,-792.86 N,-922.58 E) Polygon Point 1 5,923.00 0.00 0.00 5,948,863.00 1,678,589.00 Point 5,923.00 1.00 1.00 5,948,864.01 1,678,589.99 1L-15L1-01_Faultl 0.00 0.00 5,992.00-8,085.131,138,253.95 5,946,534.00 1,678,092.00 70' 0' 54.586 N 140' 33' 23.098 W plan misses target center by 1139199.88usft at 6300.00usft MD (5855.75 TVD,-792.86 N,-922.58 E) Polygon Point 1 5,992.00 0.00 0.00 5,946,534.00 1,678,092.00 Point 5,992.00 1.00 1,00 5,946,535.01 1,678,092.99 Casing Points Measured Vertical Casing Hole Depth Depth Diameter Diameter (usft) (usft) Name (in) (in) 10,200,00 5,995.03 2 3/8 2.375 3.000 Plan Annotations Measured Vertical Local Coordinates Depth Depth +N/S +E/-W (usft) (usft) (usft) (usft) Comment 6,300.00 5,855.75 -792.86 -922.58 TIP 6,330.00 5,878.72 -804.54 -937.94 KOP 6,351.00 5,894.20 -813.13 -949.23 End 20 dls, Start 40 dls 6,464.48 5,936.84 -874.91 -1.030.35 4 6,634.48 5,933.71 -884.15 -1.190.25 End 40 dls, Start 7 dls 6,710.00 5,930.97 -842.69 -1,253.29 6 6,785.00 5,927.96 -795.96 -1,311.84 7 6,860.00 5,926.67 -744.36 -1,366.22 8 6,985.00 5,932.16 -649.41 -1,447.14 9 7,110.00 5,937.59 -544.60 -1,514.81 10 7,210.00 5,933.10 -455.69 -1,560.22 11 7,310.00 5,925.72 -363.11 -1,597.14 12 7.410.00 5,921.32 -266.67 -1,622.96 13 7,570.00 5,915.70 -107.87 -1,639.41 14 7,900.00 5,910.30 213.62 -1,575.78 15 8,160.00 5,914.47 433.73 -1,439.51 16 8,260.00 5,917.40 513.16 -1,378.93 17 8,560.00 5,925.97 786.99 -1,260.86 18 8,635.00 5,931.24 860.16 -1,245.41 19 8,710.00 5,936.75 933.87 -1,232.82 20 8,825.00 5,938.55 1,048.40 -1,223.79 21 8,975.00 5,939.35 1,197.41 -1,208.53 22 9,100.00 5,944.26 1,321.27 -1,193.40 23 9,225.00 5,952.37 1,444.90 -1,177.73 24 9,375.00 5,973.18 1,591.58 -1,155.61 25 9,525.00 5,991.45 1,739.57 -1,141.44 26 9,705.00 5,985.62 1,916.03 -1,108.32 27 9,855.00 5,978.24 2,062.76 -1,079.11 28 9,955.00 5,981.01 2,161.22 -1,062.17 29 10,200.00 5,995.03 2,404.24 -1,044.28 Planned TD at 10200.00 1012512016 12:12:56PM Page 8 COMPASS 5000.1 Build 74 o�E n E �v m m 88888 y�£ K ¢ K K '63N?_ •� o 7 p J N N `w a �� or 2' �7 . m,7.J a0. Y = o C wu 3ao a Zc IN J R a � OD m6 O Jp V O 0 0 rn m o n O N Q F--CnmO o -- - - -d V U O-T t o N m O O N OO t` V c OC co - O �o O Z Cn V t- V o D ((� o (o N� M O e D (o I -dLo �N �o aap� OON a-MMM I�(DN c0 �OM(('>(D� a00 V m � � �co �cuNNNNNMMMM woC) c> 00000D CD (n -coJ c� o o 0 0 0 0 0 0 0 0 0 0 0 0 0 0 LL O O O O o O V' a 0 C 7 o u o N O O N M NC�> O ti O Q 7 O O o 0 O� O o rn o 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 w O o 0 0 0 0 0 0 0 0 0 0 0 cD 0 0 ?> I C' ) 1 O e- (o a O N O o N N V (D t��o O(D ctO �o V u�OOoO�O j y O .6 M M N O O)V C 6) + O(D O��(o t�a000M(�O M O Mkt W a0 oOOO0000 - N ti N N N cN .- I w T (n N O� O M L o O (D O O M (D V (o O n O n O (o O N (O 'I:O N (D rl— M L(7 Z M M O (o I O M N o N 1 o N w + CD V'MNti OOO� O �cp (o t-OONM�o (DON �NNNNNN('7 J J W Cn (o m O N o O O M w c t O o 0 1� M M V' V O N 1 �O 0(.DN (n (o O oD (O UJOOit O(DO V O e' M (" ) N N N M o t D C o t ti I- W o D O O � � o Z W ' N O uD Vr O oo O (o Lo Vr a 7 co �' Q) QLT) O V' (M M N— N -� t� N N M 0 0 a p O N O I t- M N (o O N a O V M M (O (o (o M N O OD oD O O OD O O N N N N N N U 0 0 0 o D a D N C ONO O N N oD M M M 0 0 0 O o ("> cD O O m t- t- 0 0 m 0D 6� W cD O a e WC) + Q O O O O O O O o 0 0 0 0 0 0 0 0 o 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 00000000(D Ul) �CD V (o to�-- L o (o ti t t- N N O �o(o I-O Mco o00 NM �o Il,OM (o (o (o (D t- n r r W aD w a oD oD O O CnO O U, NM<t �o(D �oD OO NM o(D ZO u' �a--���� + (ui/8sn S8) gldaQ Inivan anal 00 C, O O 0 N G 0 U N U 1� ConocoPhillips noc hHUps (/,Mas a) Deco JKup2 Kuparuk River Unit Kuparuk 1 L Pad 1 L-15 1 L-15L1-01 Plan: 1 L-15L1-01_wp03 25 October, 2016 we p P"-- 'A as BAKER HUGHES ConocoPhillips Database: EDM Alaska NSK Sandbox Company: ConocoPhillips (Alaska) Inc. -Kup2 Project: Kuparuk River Unit Site: Kuparuk 1 L Pad Well: 1L-15 Wellbore: 1 L-151-1-01 Design: 1 L-15L1-01_wp03 ConocoPhillips Planning Report Local Co-ordinate Reference: TVD Reference: MD Reference: North Reference: Survey Calculation Method: Well 1 L-15 Mean Sea Level 1 L-15 @ 118.00usft (Parker 141) True Minimum Curvature Project Kuparuk River Unit, North Slope Alaska, United States Map System: US State Plane 1927 (Exact solution) System Datum: Mean Sea Level Geo Datum: NAD 1927 (NADCON CONUS) Using Well Reference Point Map Zone: Alaska Zone 04 Using geodetic scale factor WEaI BAKER HUGHES Site Kuparuk 1 L Pad Site Position: Northing: 5,949,190.90usft Latitude: 70° 16' 19.650 N From: Map Easting: 539,916.78usft Longitude: 149' 40' 37.763 W Position Uncertainty: 0.00 usft Slot Radius: 0.000 in Grid Convergence: 0.30 ° Well 1 L-15 Well Position +Nl-S 0.00 usft Northing: 5,948,581.09 usft Latitude: 70° 16' 13.652 N +E/-W 0.00 usft Easting: 539,922.94 usft Longitude: 149° 40' 37.678 W Position Uncertainty 0.00 usft Wellhead Elevation: usft Ground Level: 83.20usft Wellbore 1L-15L1-01 Magnetics Model Name Sample Date Declination Dip Angle Field Strength (°) (°) (nT) BG G M2016 1211 /2016 17.86 80.91 57,543 Design 1L-15L1-01_wp03 Audit Notes: Version: Vertical Section: Phase: Depth From (TVD) (usft) -83.20 PLAN +N/-S (usft) 0.00 Tie On Depth: +E/-W (usft) 0,00 6,540.00 Direction (I 200.00 Plan Sections Measured TVD Below Dogleg Build Turn Depth Inclination Azimuth System +Nl-S +E/-W Rate Rate Rate TFp (usft) (°) (I (usft) (usft) (usft) (°/100ft) (°/100ft) (°1100ft) Target 6,540.00 91.01 262.90 5,936.16 -903.11 -1,099.47 0.00 0.00 0.00 0.00 6,610.00 95.25 260.45 5,932.34 -913.22 -1,168.61 7.00 6.06 -3.51 -30.00 6,760.00 90.00 251.34 5,925.48 -949.70 -1,313.73 7.00 -3.50 -6.06 -120.00 6,960.00 90.00 237.34 5,925.48 -1,036.07 -1,493.57 7.00 0.00 -7.00 -90.00 7,110.00 87.28 227.20 5,929.04 -1,127.70 -1,612.01 7.00 -1.81 -6.77 -105.00 7,310.00 87.28 213.18 5,938.52 -1,279.93 -1,740.61 7.00 0.00 -7.01 -90.00 7,610.00 85.82 192.20 5,956.57 -1,554.65 -1,855.49 7.00 -0.49 -7.00 -94.00 7,850.00 89.31 175.75 5,966.77 -1,793.00 -1,872.01 7.00 1.46 -6.85 -78.00 8,050.00 89.31 189.75 5,969.17 -1,992.26 -1,881.56 7.00 0.00 7.00 90.00 8,150.00 89.31 182.75 5,970.37 -2,091.60 -1,892.44 7.00 0.00 -7.00 -90.00 8,275.00 87.05 191.20 5,974.34 -2,215.49 -1,907.59 7.00 -1.81 6.77 105.00 6,375.00 87.05 198.21 5,979.49 -2,312.03 -1,932.92 7.00 0.00 7.01 90.00 8,575.00 89.00 184.34 5,986.40 -2,507.56 -1,971.90 7.00 0.97 -6.93 -82.00 8,725.00 89.00 194.84 5,989.02 -2,655.24 -1,996.85 7.00 0.00 7.00 90.00 9,025.00 89.00 173.84 5,994.28 -2,952.66 -2,019.42 7.00 0.00 -7.00 -90.00 9,300.00 88.32 193.08 6,000.70 -3,225.79 -2,035.92 7.00 -0.24 7.00 92.00 1012512016 12:25:34PM Page 2 COMPASS 5000.1 Build 74 6 ConocoPhillips MCA.. ConocoPhillips Planning Report BAKER HUGHES Database: EDM Alaska NSK Sandbox Local Co-ordinate Reference: Well 1L-15 Company: ConocoPhillips (Alaska) Inc. -Kup2 TVD Reference: Mean Sea Level Project: Kuparuk River Unit MD Reference: 1 L-15 @ 118.00usft (Parker 141) Site: Kuparuk 1L Pad North Reference: True Well: 1L-15 Survey Calculation Method: Minimum Curvature Wellbore: 1 L-15L1-01 Design: 1 L-15L1-01_wp03 Planned Survey Measured TVD Below Vertical Dogleg Toolface Map Map Depth Inclination Azimuth System +NHS +E1-W Section Rate Azimuth Northing Easting (usft) (°) (°) (usft) (usft) (usft) (usft) (°1100ft) (°) (usft) (usft) 6,540.00 91.01 262.90 5.936.16 -903.11 -1,099.47 1,224.69 0.00 0.00 5,947,672.25 538,828.38 TIP/KOP 6,610.00 95.25 260.45 5,932.34 -913.22 -1.168.61 1,257.84 7.00 -29.95 5,947,661.77 538,759.30 Start 7 dls 6,760.00 90.00 251.34 5,925.48 -949.70 -1,313.73 1,341.75 7.00 -119.72 5,947,624.53 538,614.39 3 6.960.00 90.00 237.34 5,925.48 -1,036.07 -1.493.57 1,484.42 7.00 -90.00 5,947.537.21 538,435.04 4 7,110.00 87.28 227.20 5,929.04 -1,127.70 -1,612.01 1,611.03 7.00 -105.08 5,947,444.96 538,317.09 5 7,310.00 87.28 213.18 5,938.52 -1,279.93 -1,740.61 1,798.06 7.00 -90.33 5,947,292.07 538,189.32 6 7,610.00 85.82 192.20 5,956.57 -1,554.65 -1,855.49 2,095.51 7.00 -94.59 5,947,016.77 538,075.90 7 7,850.00 89.31 175.75 5,966.77 -1,793.00 -1,872.01 2,325.14 7.00 -78.43 5,946.778,36 538,060.65 8 8,050.00 89.31 189.75 5,969.17 -1,992.26 -1,881.56 2,515.65 7.00 90.08 5,946,579.07 538,052.15 9 8,150.00 89.31 182.75 5.970.37 -2,091.60 -1,892.44 2,612.71 7.00 -90.04 5,946,479.69 538,041.81 10 8.275.00 87.05 191.20 5,974.34 -2,215.49 -1,907.59 2,734.31 7.00 105.11 5,946,355.73 538,027.32 11 8,375.00 87.05 198.21 5,979.49 -2,312.03 -1,932.92 2,833.69 7.00 90.18 5,946,259.07 538,002.50 12 8,575.00 89.00 184.34 5.986.40 -2,507.56 -1,971.90 3,030.77 7.00 -82.28 5,946,063.35 537,964.56 13 8,725.00 89.00 194.84 5,989.02 -2,655.24 -1,996.85 3,178.07 7.00 90.09 5,945,915.56 537,940.40 14 9,025.00 89.00 173.84 5,994.28 -2,952.66 -2.019.42 3,465.27 7.00 -90.19 5,945,618.05 537,919.41 15 9,300.00 88.32 193.08 6,000.70 -3,225.79 -2,035.92 3,727.58 7.00 92.21 5,945,344.86 537,904.36 Planned TD at 9300.00 1012512016 12:25:34PM Page 3 COMPASS 5000.1 Build 74 ConocoPhillips w3:. ConocoPhillips Planning Report BAKER HUGHES Database: EDM Alaska NSK Sandbox Local Co-ordinate Reference: Well 1L-15 Company: ConocoPhillips (Alaska) Inc. -Kup2 TVD Reference: Mean Sea Level Project: Kuparuk River Unit MD Reference: 1 L-15 @ 118.00usft (Parker 141) Site: Kuparuk 1L Pad North Reference: True Well: 1L-15 Survey Calculation Method: Minimum Curvature Wellbore: 1 L-15L1-01 Design: 1 L-15L1-01_wp03 Targets Target Name hitlmiss target Dip Angle Dip Dir. TVD +N/S +E/-W Northing Easting Shape (1) (1) (usft) (usft) (usft) (usft) (usft) Latitude Longitude 1 L-151-1-01_T02 0.00 0.00 5,933.00-7,235.331,138,876.53 5,947,387.00 1,678,710.00 70' V 1.925 N 1400 33' 1.783 W plan misses target center by 1139993.59usft at 6540.00usft MD (5936.16 TVD,-903.11 N,-1099.47 E) Point 11--151-1_Fault3 0.00 0.00 5,941.00-5,360.221,138,894.48 5,949,262.00 1,678,718.00 70' V 20.105 N 140' 32' 53.233 W plan misses target center by 1140002.67usft at 6540.00usft MD (5936.16 TVD,-903.11 N,-1099.47 E) Polygon Point 1 5,941.00 0.00 0.00 5,949,262.00 1,678,718.00 Point 5,941.00 1.00 1.00 5,949,263.01 1,678.718.99 11--151-1_Faultl_M 0.00 0.00 0.00-6,611.351,138,514.80 5,948,009.00 1,678,345.00 70' V 8.514 N 140' 33' 9.378 W plan misses target center by 1139644.03usft at 6540.O0usft MD (5936.16 TVD,-903.11 N,-1099.47 E) Rectangle (sides W1,000.00 1-11.00 D0.00) 1L-15L1-01_T03 0.00 0.00 5,930.00-7,349.181,138,655.90 5,947,272.00 1,678,490.00 70° V 1.143 N 140' 33' 8.534 W plan misses target center by 1139773.60usft at 6540.00usft MD (5936.16 TVD,-903.11 N,-1099.47 E) Point 1 L-151-1-01_T04 0.00 0.00 5,943.00 -7,589.181,138,463.61 5,947,031.00 1,678,299.00 70' 0' 59.094 N 140° 33' 15.022 W plan misses target center by 1139582.70usft at 6540.00usft MD (5936.16 TVD,-903.11 N,-1099.47 E) Point 11--151-1-01_Fault1_M 0.00 0.00 0.00 -8,085.131,138,253.95 5,946,534.00 1,678,092.00 70' 0' S4.586 N 140° 33' 23.098 W plan misses target center by 1139391.53usft at 6540.00usft MD (5936.16 TVD,-903.11 N,-1099.47 E) Rectangle (sides W1,000.00 1-11.00 D0.00) 1 L-151-1_Faultl 0.00 0.00 5,928.00 -6,611.351,138,514.80 5,948,009.00 1,678,345.00 70' V 8.514 N 140° 33' 9.378 W plan misses target center by 1139628.57usft at 6540.00usft MD (5936.16 TVD,-903.11 N,-1099.47 E) Polygon Point 5,928.00 0.00 0.00 5,948,009.00 1,678,345.00 Point 5,928.00 1.00 1.00 5,948,010.01 1,678,345.99 1 L-15 CTD Polygon Sou 0.00 0.00 0.00 -7,318.271,139,240.13 5,947,306.00 1,679,074.00 70° 1' 0.586 N 140' 32' 51.816 W - plan misses target center by 1140373.10usft at 6540.00usft MD (5936.16 TVD,-903.11 N,-1099.47 E) Polygon Point 1 0.00 0.00 0.00 5,947,306.00 1,679,074.00 Point 0.00 -130.08-368.72 5,947,173.98 1,678,706.01 Point 0.00 -192.21-536.07 5.947,110.97 1,678,539.01 Point 0.00 -378.39-696.07 5,946,923.96 1,678,380.02 Points 0.00 -580.00-774.13 5,946,721.96 1,678,303.03 Point 0.00 -898.95-789.81 5,946,402.96 1,678,289.05 Point 0.00 -1,245.77-832.64 5,946,055.95 1,678,248.06 Point 0.00 -1,641.47-897.72 5,945,659.95 1,678,185.09 Point 0.00 -2,231.27-948.83 5,945,069.95 1,678,137.11 Point 10 0.00 -2,488.29-950,18 5,944,812.95 1,678,137.12 Point 11 0.00 -2,403.13-1,359.78 5,944,895.93 1,677,727.12 Point12 0.00 -1,903.52-1,274.14 5,945,395.94 1,677,810.10 Point13 0.00 -1,438.66-1,236.70 5,945,860.94 1.677,845.07 Point14 0.00 -827.83-1,191.48 5,946,471.94 1,677,887.04 Point 15 0.00 -418.01-1,148.32 5,946,881.95 1,677,928.03 Point 16 0.00 -112.79-993.70 5,947,187.95 1,678,081.01 Point 17 0.00 135.99-756.37 5,947,437.96 1,678,316.99 Point 18 0.00 266.58-484.65 5,947,569.98 1,678,587.99 Point 19 0.00 368.47 -81.07 5,947,674.00 1,678,990.98 Point20 0.00 0.00 0.00 5,947,306.00 1,679.074.00 1 L-151-1_Fault3_M 0.00 0.00 0.00 -5,360.221,138,894.48 5,949,262.00 1,678,718.00 70' V 20.105 N 140' 32' S3.233 W - plan misses target center by 1140018.12usft at 6540.00usft MD (5936.16 TVD,-903.11 N,-1099.47 E) - Rectangle (sides W1,000.00 1-11.00 D0.00) 1L-15 CTD Polygon Non 0.00 0.00 0.00 -7,311.271,139,240.17 5,947,313.00 1,679,074.00 70° V 0.654 N 140° 32' S1.785 W Ian misses target center by 1140373.10usft at 6540.O0usft MD 5936.16 TVD-903.11 N-1099.47 E 1012512016 12:25:34PM Page 4 COMPASS 5000.1 Build 74 ConocoPhillips WIPS.. ConocoPhillips Planning Report BAKER HUGHES Database: EDM Alaska NSK Sandbox Local Co-ordinate Reference: Well 1L-15 Company: ConocoPhillips (Alaska) Inc. -Kup2 TVD Reference: Mean Sea Level Project: Kuparuk River Unit MD Reference: 1 L-15 @ 118.00usft (Parker 141) Site: Kuparuk 1 L Pad North Reference: True Well: 1 L-15 Survey Calculation Method: Minimum Curvature Wellbore: 1 L-15L1-01 Design: 1 L-15L1-01_wp03 Polygon Point 1 0.00 0.00 0.00 5,947.313.00 1,679,074.00 Point 0.00 -75.99-194.42 5,947,235.99 1,678,880.00 Point 3 0.00 9.52-479.00 5,947,319.98 1,678,595.00 Point 0.00 246.78-713.78 5,947,555.97 1,678,358.99 Points 0.00 622.80-899.83 5,947,930.96 1,678,170.97 Point 0.00 977.12-952.97 5,948,284.96 1,678,115.95 Point? 0.00 1,261.70-868.47 5,948,569.95 1,678,198.94 Point 0.00 1,648.28-588.41 5,948,957.97 1,678,476.91 Point 9 0.00 2,418.87-494.35 5,949,728.98 1.678,566.88 Point 10 0.00 2,759.46-409.55 5,950,069.98 1,678,649.86 Point 11 0.00 3,417.93-294.08 5,950,728.99 1,678,761.82 Point 12 0.00 3,660.55-216.80 5,950,971.99 1,678,837.81 Point 13 0.00 3,645.42 -1.85 5,950,958.00 1,679,052.82 Point 14 0.00 3,423.14 45.99 5,950,736.00 1,679,101.83 Point 15 0.00 3,069.33 2.12 5,950,382.00 1,679,059.84 Point 16 0.00 2,715.70 -75.74 5,950,027.99 1,678,983.86 Point 17 0.00 2,403.12-161.39 5,949,714.99 1,678,899.88 Point 18 0.00 2.077.02-149.11 5,949,389.00 1,678,913.89 Point 19 0.00 1,765.13-177.75 5,949,076.99 1,678,886.91 Point20 0.00 1,459.80-311.37 5,948,770.98 1,678,754.92 Point21 0.00 1,127.83-515.13 5,948,437.97 1,678,552.95 Point 22 0.00 925.99-550.20 5,948,235.97 1.678,518.95 Point23 0.00 592.57-475.94 5,947,902.98 1,678,594.97 Point 24 0.00 390.71-316.98 5,947,701.98 1,678,754.98 Point25 0.00 354.47 -81.15 5,947,667.00 1,678,990.98 Point26 0.00 0.00 0.00 5,947,313.00 1,679,074.00 1L-151-1-01_T01 0.00 0.00 5,938.00 -7,167.421,139,081.91 5,947,456.00 1,678,915.00 70' V 2.283 N 140° 32' 55.661 W - plan misses target center by 1140198.60usft at 6540.00usft MD (5936.16 TVD,-903.11 N,-1099.47 E) - Point 1 L-151-1-01_T05 0.00 0.00 5,969.00 -8,065.351,138,297.06 5,946,554.00 1,678,135.00 70' 0' 54.715 N 140' 33' 21.790 W - plan misses target center by 1139419.05usft at 6540.00usft MD (5936.16 TVD,-903.11 N,-1099.47 E) - Point 1L-151-1_Fault2_M 0.00 0.00 0.00 -5,758.571,138,763.35 5,948,863.00 1,678,589.00 70° 1' 16.430 N 140° 32' S8.665 W plan misses target center by 1139888.62usft at 6540.00usft MD (5936.16 TVD,-903.11 N,-1099.47 E) Rectangle (sides W1,000.00 1-11.00 D0.00) 1L-151-1-01 T07 0.00 0.00 5,979.00 -8,598.881,138,196.22 5,946,020.00 1,678,037.00 70' 0' 49.682 N 140° 33' 26.938 W plan misses target center by 1139321.69usft at 6540.00usft MD (5936.16 TVD,-903.11 N,-1099.47 E) Point 1L-151-1-01_T08 0.00 0.00 5,986.00 -8,946.671,138,149.37 5,945,672.00 1,677,992.00 70' 0' 46.374 N 140' 33' 29.757 W plan misses target center by 1139277.24usft at 6540.00usft MD (5936.16 TVD,-903.11 N,-1099.47 E) Point 1L-15L1-01 T06 0.00 0.00 5,971.00 -8,320.101,138,243.71 5,946,299.00 1,678,083.00 70' 0' 52.319 N 140' 33' 24.396 W plan misses target center by 1139367.32usft at 6540.00usft MD (5936.16 TVD,-903.11 N,-1099.47 E) Point 1L-15L1_Fault2 0.00 0.00 5,923.00 -5,758.571,138,763.35 5,948,863.00 1,678,589.00 70° V 16.430 N 140° 32' S8.665 W plan misses target center by 1139873.17usft at 6540.00usft MD (5936.16 TVD,-903.11 N,-1099.47 E) Polygon Point 1 5,923.00 0.00 0.00 5.948,863.00 1,678,589.00 Point 5,923.00 1.00 1.00 5,948,864.01 1,678,589.99 1L-151-1-01_Faultl 0.00 0.00 5,992.00 -8,085.131,138,253.95 5,946,534.00 1,678,092.00 70° 0' 54.586 N 140' 33' 23.098 W - plan misses target center by 1139376.07usft at 6540.00usft MD (5936.16 TVD,-903.11 N,-1099.47 E) - Polygon Point 1 5,992.00 0.00 0.00 5,946,534.00 1,678,092.00 Point 5,992.00 1.00 1.00 5,946,535.01 1.678,092.99 1L-15L1-01_T09 0.00 0.00 5,992.00 -9,497.421,138,090.44 5,945,121.00 1,677,936.00 70' 0' 41.112 N 140' 33' 33.787 W plan misses target center by 1139222.34usft at 6540.00usft MD (5936.16 TVD,-903.11 N,-1099.47 E) Point 1012512016 12:25:34PM Page 5 COMPASS 5000.1 Build 74 ConocoPhillips Database: EDM Alaska NSK Sandbox Company: ConocoPhillips (Alaska) Inc. -Kup2 Project: Kuparuk River Unit Site: Kuparuk 1 L Pad Well: 1L-15 Wellbore: 1 L-15L1-01 Design: 1 L-151-1-01_wp03 ConocoPhillips Planning Report Local Co-ordinate Reference: TVD Reference: MD Reference: North Reference: Survey Calculation Method: Well 1L-15 Mean Sea Level 1L-15 @ 118.00usft (Parker141) True Minimum Curvature Casing Points Measured Vertical Casing Hole Depth Depth Diameter Diameter (usft) (usft) Name (in) (in) 9,300.00 6,000.70 2 3/8" 2.375 3.000 WG.I BAKER HUGHES Plan Annotations Measured Vertical Local Coordinates Depth Depth +N/-S +E/-W (usft) (usft) (usft) (usft) Comment 6,540.00 5,936.16 -903.11 -1,099.47 TIP/KOP 6,610.00 5,932.34 -913.22 -1,168.61 Start 7dls 6.760.00 5,925.48 -949.70 -1,313.73 3 6,960.00 5,925.48 -1,036.07 -1,493.57 4 7,110.00 5,929.04 -1,127.70 -1,612.01 5 7,310.00 5,938.52 -1,279.93 -1,740.61 6 7,610.00 5,956.57 -1,554.65 -1,855.49 7 7,850.00 5,966.77 -1,793.00 -1,872.01 8 3,050.00 5,969.17 -1,992.26 -1,881.56 9 8,150.00 5,970.37 -2,091.60 -1,892.44 10 8,275.00 5,974.34 -2,215.49 -1,907.59 11 8,375.00 5,979.49 -2,312.03 -1,932.92 12 8,575.00 5,986.40 -2,507.56 -1,971.90 13 8,725.00 5,989.02 -2,655.24 -1,996.85 14 9,025.00 5,994.28 -2,952.66 -2,019.42 15 9,300.00 6,000.70 -3,225.79 -2,035.92 Planned TD at 9300.00 1012512016 12:25:34PM Page 6 COMPASS 5000.1 Build 74 ConocoPhillips ConocoPhillips (Alaska) Inc. -Kup2 Kuparuk River Unit Kuparuk 1 L Pad 1 L-15 1 L-15L1-02 Plan: 1 L-15L1-02_wp00 Standard Planning Report 25 October, 2016 MAd"i"k-I BAKER HUGHES ConocoPhillips Database: EDM Alaska NSK Sandbox Company: ConocoPhillips (Alaska) Inc. -Kup2 Project: Kuparuk River Unit Site: Kuparuk 1 L Pad Well: 1 L-15 Wellbore: 1 L-151_1-02 Design: 1 L-15L1-02_wp00 ConocoPhillips Planning Report Local Cc -ordinate Reference: Well 1 L-15 TVD Reference: Mean Sea Level MD Reference: 1 L-15 @ 118.00usft (Parker 141) North Reference: True Survey Calculation Method: Minimum Curvature Project Kuparuk River Unit, North Slope Alaska, United States Map System: US State Plane 1927 (Exact solution) System Datum: Mean Sea Level Geo Datum: NAD 1927 (NADCON CONUS) Using Well Reference Point Map Zone: Alaska Zone 04 Using geodetic scale factor rGFSI BAKER HUGHES Site Kuparuk 1 L Pad Site Position: Northing: 5,949,190.90usft Latitude: 70' 16' 19.650 N From: Map Easting: 539,916.78 usft Longitude: 149° 40' 37.763 W Position Uncertainty: 0.00 usft Slot Radius: 0.000 in Grid Convergence: 0.30 ° Well 1L-15 Well Position +N/-S 0.00 usft Northing: 5,948,581.09 usft Latitude: 70' 16' 13.652 N +E/-W 0.00 usft Easting: 539,922.94 usft Longitude: 149' 40' 37.678 W Position Uncertainty 0.00 usft Wellhead Elevation: usft Ground Level: 83.20 usft Wellbore 1 L-151-1-02 Magnetics Model Name Sample Date Declination Dip Angle Field Strength (1) (1) (nT) BGGM2016 12/1/2016 17.86 80.91 57,543 Design 1 L-15L1-02_wp00 Audit Notes: Version: Phase: PLAN Tie On Depth: 6,380.00 Vertical Section: Depth From (TVD) +N/-S +E/-W Direction (usft) (usft) (usft) (1) -83.20 0.00 0.00 0.00 1012512016 12:27.12PM Page 2 COMPASS 5000.1 Build 74 GonocoPhillips MAP.. ConocoPhiliips Planning Report RAKW HUGHES Database: EDM Alaska NSK Sandbox Local Co-ordinate Reference: Well 1 L-15 Company: GonocoPhillips (Alaska) Inc. -Kup2 TVD Reference: Mean Sea Level Project: Kuparuk River Unit MD Reference: 1L-15 @ 118.00usft (Parker 141) Site: Kuparuk I Pad North Reference: True Well: 1L-15 Survey Calculation Method: Minimum Curvature Wellbore: 1 L-15L1-02 Design: 1 L-15L1-02_wp00 Plan Sections Measured TVD Below Dogleg Build Turn Depth Inclination Azimuth System +N/-S +E/-W Rate Rate Rate TFO (usft) (°) (°) (usft) (usft) (usft) (°/100ft) (°/100ft) (°/100ft) (°) Target 6,380.00 56.21 232.71 5,912.65 -826.65 -966.98 0.00 0.00 0.00 0.00 6,450.00 84.21 232.71 5,936.11 -866.16 -1.018.86 40.00 40.00 0.00 0.00 6,630.00 90.11 304.60 5,946.42 -869.79 -1,186.89 40.00 3.28 39.94 88.00 6,700.00 90.53 309.48 5,946.03 -827.63 -1,242.75 7.00 0.61 6.97 85.00 6,770.00 90.53 314.38 5,945.38 -780.87 -1,294.80 7.00 0.00 7.00 90.00 6,870.00 87.03 320.45 5.947.51 -707.30 -1,362.41 7.00 -3.50 6.07 120.00 6,995.00 91.42 328.02 5,949.19 -605.97 -1,435.38 7.00 3.51 6.06 60.00 7,095.00 97.15 332.06 5,941.72 -519.64 -1,485.16 7.00 5.73 4.04 35.00 7,195.00 94.71 338.66 5,931.38 -429.28 -1,526.58 7.00 -2.44 6.60 110.00 7,295.00 93.71 345.61 5,924.03 -334.41 -1,557.15 7.00 -1.01 6.95 98.00 7,455.00 93.63 356.83 5,913.76 -176.87 -1,581.49 7.00 -0.04 7.01 90.00 8,065.00 89.29 39.33 5,897.44 389.40 -1,396.36 7.00 -0.71 6.97 95.00 8,365.00 89.34 18.33 5,901.08 650.71 -1,252.49 7.00 0.02 -7.00 -90.00 8,440.00 84.40 16.53 5,905.17 722.14 -1,230.07 7.00 -6.58 -2.40 -160.00 8,515.00 88.96 13.91 5,909.51 794.36 -1,210.42 7.00 6.07 -3.50 -30.00 8,630.00 91.04 6.13 5,909.52 907.51 -1,190.43 7.00 1.81 -6.76 -75.00 8,700.00 90.61 11.01 5,908.51 976.70 -1,179.99 7.00 -0.61 6.97 95.00 8,825.00 87.62 2.79 5,910.43 1,100.66 -1,164.99 7.00 -2.39 -6.58 -110.00 8,950.00 87.65 11.55 5,915.60 1,224.46 -1,149.42 7.00 0.02 7.01 90.00 9,100.00 79.08 5.44 5,932.93 1,371.60 -1,127.38 7.00 -5.71 -4.07 -145.00 9,250.00 89.58 5.44 5,947.73 1,519.99 -1,113.26 7.00 7.00 0.00 0.00 9,430.00 97.65. 15.14 5,936.37 1,696.40 -1,081.31 7.00 4.48. 5.39 50.00 9,580.00 92.32 6.05 5,923.32 1,843.08 -1,053.91 7.00 -3.55 -6.06 -120.00 9,680.00 88.82 12.11 5,922.33 1,941.76 -1.038.13 7.00 -3.51 6.06 120.00 9,880.00 88.85 358.11 5,926.42 2,140.43 -1,020.36 7.00 0.02 -7.00 -90.00 10,200.00 88.94 20.52 5,932.68 2,454.14 -968.91 7.00 0.03 7.00 90.00 1012512016 12:27:12PM Page 3 COMPASS 5000.1 Build 74 ConocoPhillips .e.. ConocoPhillips Planning Report BAKER HUGHES Database: EDM Alaska NSK Sandbox Local Co-ordinate Reference: Well 1L-15 Company: ConocoPhillips (Alaska) Inc. -Kup2 TVD Reference: Mean Sea Level Project: Kuparuk River Unit MD Reference: 1 L-15 @ 118.00usft (Parker 141) Site: Kuparuk I Pad North Reference: True Well: 1L-15 Survey Calculation Method: Minimum Curvature Wellbore: 1L-151-1-02 Design: 1 L-15L1-02_wp00 Planned Survey Measured TVD Below Vertical Dogleg Toolface Map Map Depth Inclination Azimuth System +N/-S +E/-W Section Rate Azimuth Northing Easting (usft) (°) (1 (usft) (usft) (usft) (usft) (0/100ft) (°) (usft) (usft) 6,380.00 56.21 232.71 5.912.65 -826.65 -966.98 -826.65 0.00 0.00 5,947,749.41 538,960.46 TIP 6,450.00 84.21 232.71 5,936.11 -866.16 -1,018.86 -866.16 40.00 0.00 5,947,709.63 538,908.79 KOP 6,630.00 90.11 304.60 5,946.42 -869.79 -1,186.89 -869.79 40.00 88.00 5,947,705.11 538,740.80 Start 40 dls 8,700.00 90.53 309.48 5,946.03 -827.63 -1,242.75 -827.63 7.00 85.00 5,947,746.96 538,684.72 End 40 dls, Start 7 dls 6,770.00 90.53 314.38 5,945.38 -780.87 -1,294.80 -780.87 7.00 90.00 5,947,793.44 538,632.43 5 6,870.00 87.03 320.45 5,947.51 -707.30 -1,362.41 -707.30 7.00 120.00 5,947,866.64 538,564.43 6 6,995.00 91.42 328.02 5,949.19 -605.97 -1.435.38 -605.97 7.00 60.00 5,947,967.57 538,490.93 7 7,095.00 97.15 332.06 5,941.72 -519.64 -1,485.16 -519.64 7.00 35.00 5,948,053.64 538,440.71 8 7,195.00 94.71 338.66 5,931.38 -429.28 -1.526.58 -429.28 7.00 110.00 5,948,143.76 538,398.81 9 7,295.00 93.71 345.61 5,924.03 -334.41 -1,557.15 -334.41 7.00 98.00 5,948,238.45 538,367.74 10 7,455.00 93.63 356.83 5,913.76 -176.87 -1,581.49 -176.87 7.00 90.00 5,948,395.85 538,342.57 11 8,065.00 89.29 39.33 5,897.44 389.40 -1,396.36 389.40 7.00 95.00 5,948,963.04 538,524.68 12 8,365.00 89.34 18.33 5,901.08 650.71 -1,252.49 650.71 7.00 -90.00 5,949,225.09 538,667.14 13 8,440.00 84.40 16.53 5,905.17 722.14 -1,230.07 722.14 7.00 -160.00 5,949,296.62 538,689.18 14 8,515.00 88.96 13.91 5,909.51 794.36 -1,210.42 794.36 7.00 -30.00 5,949,368.94 538,708.44 15 8,630.00 91.04 6.13 5,909.52 907.51 -1,190.43 907.51 7.00 -75.00 5,949,482.19 538,727.83 16 8,700.00 90.61 11.01 5,908.51 976.70 -1,179.99 976.70 7.00 95.00 5,949,551.42 538,737.90 17 8,825.00 87.62 2.79 5,910.43 1,100.66 -1,164.99 1,100.66 7.00 -110.00 5,949,675.45 538,752.25 18 8,950.00 87.65 11.55 5,915.60 1,224.46 -1,149.42 1,224.46 7.00 90.00 5,949,799.31 538,767.16 19 9,100.00 79.08 5.44 5,932.93 1,371.60 -1,127.38 1,371.60 7.00 -145.00 5,949,946.56 538,788.41 20 9,250.00 89.58 5.44 5,947.73 1,519.99 -1,113.26 1,519.99 7.00 0.00 5,950,095.00 538,801.74 21 9,430.00 97.65 15.14 5,936.37 1,696.40 -1,081.31 1,696.40 7.00 50.00 5,950,271.56 538,832.76 22 9,580.00 92.32 6.05 5,923.32 1,843.08 -1,053.91 1,843.08 7.00 -120.00 5,950,418.37 538,859.37 23 9,680.00 88.82 12.11 5,922.33 1,941.76 -1,038.13 1,941.76 7.00 120.00 5,950,517.12 538,874.63 24 9,880.00 88.85 358.11 5,926.42 2,140.43 -1,020.36 2,140.43 7.00 -90.00 5,950,715.86 538,891.34 25 10,200.00 88.94 20.52 5,932.68 2,454.14 -968.91 2,454.14 7.00 90.00 5,951,029.82 538,941.12 10/25/2016 12:27.12PM Page 4 COMPASS 5000.1 Build 74 ConocoPhillips Database: EDM Alaska NSK Sandbox Company: ConocoPhillips (Alaska) Inc. -Kup2 Project: Kuparuk River Unit Site: Kuparuk 1 L Pad Well: 1L-15 Wellbore: 1 L-151-1-02 Design: 1 L-151-1-02_wp00 ConocoPhillips Planning Report Local Co-ordinate Reference: TVD Reference: MD Reference: North Reference: Survey Calculation Method: Well 1 L-15 Mean Sea Level iL-15 @ 118.00usft (Parker 141) True Minimum Curvature His BAKER HUGHES Planned Survey Measured TVD Below Vertical Dogleg Toolface Map Map Depth Inclination Azimuth System +N/-S +E/-W Section Rate Azimuth Northing Easting (usft) (°) (°) (usft) (usft) (usft) (usft) (°/100ft) (°) (usft) (usft) Planned TD at 10200.00 1012512016 12:27:12PM Page 5 COMPASS 5000.1 Build 74 ConocoPhillips reA.. ConocoPhillips Planning Report BAKER HUGHES Database: EDM Alaska NSK Sandbox Company: ConocoPhillips (Alaska) Inc. -Kup2 Project: Kuparuk River Unit Site: Kuparuk 1L Pad Well: 1L-15 Wellbore: 1 L-15L1-02 Design: 1 L-15L1-02_wp00 Targets Local Co-ordinate Reference: TVD Reference: MD Reference: North Reference: Survey Calculation Method: Well 1L-15 Mean Sea Level 1 L-15 @ 118.00usft (Parker 141) True Minimum Curvature Target Name hit/miss target Dip Angle Dip Dir. TVD +Nl-S +E/-W Northing Easting Shape (1) V) (usft) (usft) (usft) (usft) (usft) 1L-151-1_Fault3 0.00 0.00 5,941.00-5,360.221,138,894.48 5,949,262.00 - plan misses target center by 1139870.47usft at 6380.00usft MD (5912.65 TVD,-826.65 N,-966.98 E) - Polygon Point 1 5,941.00 0.00 0.00 5,949,262.00 Point 2 5,941.00 1.00 1.00 5,949,263.01 1L-151-1_Faultl_M 0.00 0.00 0.00-6,611.351,138,514.80 5,948,009,00 - plan misses target center by 1139511.80usft at 6380.00usft MD (5912.65 TVD,-826.65 N,-966.98 E) - Rectangle (sides W1,000.00 H1.00 D0.00) 1L-15L1-01_Faultl_M 0.00 0.00 0.00-8,085.131,138,253.95 5,946,534.00 plan misses target center by 1139259.40usft at 6380.00usft MD (5912.65 TVD,-826.65 N,-966.98 E) Rectangle (sides W1,000.00 1-11.00 D0.00) 1L-15L1 Faultl 0.00 0.00 5,928.00-6,611.351,138,514.80 5,948,009.00 plan misses target center by 1139496.46usft at 6380.00usft MD (5912.65 TVD,-826.65 N,-966.98 E) Polygon Point 1 5,928.00 0.00 0.00 5,948,009.00 Point 2 5,928.00 1.00 1.00 5,948,010.01 1L-15L1-02_T01 0.00 0.00 5,933.00-3,842.441,139,157.56 5,950,781.00 plan misses target center by 1140128.52usft at 6380.00usft MD (5912.65 TVD,-826.65 N,-966.98 E) Point 1L-15 CTD Polygon Sou 0.00 0.00 0.00 -7,318.271,139,240.13 5,947,306.00 - plan misses target center by 1140240.92usft at 6380.00usft MD (5912.65 TVD,-826.65 N. -966.98 E) Polygon Point 1 0.00 0.00 0.00 5,947,306.00 Point 2. 0.00 -130.08 -368.72 5,947,173.98 Point 0.00 -192.21 -536.07 5,947,110.97 Point 4 0.00 -378.39 -696.07 5,946,923.96 Point 5 0.00 -580.00 -774.13 5,946,721.96 Point 0.00 -898.95 -789.81 5,946,402.96 Point 0.00 -1,245.77 -832.64 5,946,055.95 Point 0.00 -1,641.47 -897.72 5,945,659.95 Point 9 0.00 -2,231.27 -948.83 5.945,069.95 Point 10 0.00 -2,488.29 -950.18 5,944,812.95 Point 11 0.00 -2,403.13 -1,359.78 5,944,895.93 Point12 0.00 -1,903.52 -1,274.14 5,945,395.94 Point13 0.00 -1,438.66 -1,236.70 5,945,860.94 Point 14 0.00 -827.83 -1,191.48 5,946,471.94 Point 15 0.00 -418.01 -1,148.32 5,946,881.95 Point16 0.00 -112.79 -993.70 5,947,187.95 Point 17 0.00 135.99 -756.37 5,947,437.96 Point 18 0.00 266.58 -484.65 5,947,569.98 Point 19 0.00 368A7 -81.07 5,947,674.00 Point 20 0.00 0.00 0.00 5,947,306.00 1,678,718.00 1,678,718.00 1,678,718.99 1,678,345.00 1,678,092.00 1, 678, 345.00 1, 678, 345.00 1, 678, 345.99 1, 678, 973.00 1, 679, 074.00 1,679,074.00 1,678,706.01 1,678, 539.01 1,678,380.02 1, 678, 303.03 1, 678, 289.05 1, 678, 248.06 1,678,185.09 1,678,137.11 1,678,137.12 1,677,727.12 1, 677, 810.10 1,677,845.07 1, 677, 887.04 1, 677, 928.03 1, 678, 081.01 1, 678, 316.99 1, 678, 587.99 1, 678, 990.98 1, 679, 074.00 Latitude Longitude 70° 1' 20.105 N 140° 32' 53.233 W 70°V8.514N 140' 33'9.378 W 70' 0' 54.586 N 140° 33' 23.098 W 70° 1' 8.514 N 140' 33' 9.378 W I 70° 1' 34.456 N 140° 32' 39.250 W I 70° V 0.586 N 140° 32' 51.816 W I 1 L-151-1_Fault3_M 0.00 0.00 0.00 -5,360.221,138,894.48 5,949,262.00 1,678,718.00 70' V 20.105 N 140' 32' 53.233 W plan misses target center by 1139885.81 usft at 6380.00usft MD (5912.65 TVD,-826.65 N,-966.98 E) Rectangle (sides W1,000.00 1-11.00 D0.00) 1L-15 CTD Polygon Nora 0.00 0.00 0.00 -7,311.271,139,240.17 5,947,313.00 1,679,074.00 700 V 0.654 N 1400 32' 51.785 W - plan misses target center by 1140240.92usft at 6380.00usft MD (5912.65 TVD,-826.65 N,-966.98 E) - Polygon Point 0.00 0.00 0.00 5,947,313.00 1,679,074.00 Point 0.00 -75.99-194.42 5,947,235.99 1,678,880.00 Point 0.00 9.52-479.00 5,947,319.98 1,678,595.00 Point 0.00 246.78-713.78 5,947,555.97 1,678,358.99 Point 5 0.00 622.80-899.83 5,947,930.96 1.678,170.97 Point 0.00 977.12-952.97 5,948,284.96 1,678,115.95 1012512016 12:27:12PM Page 6 COMPASS 5000.1 Build 74 ConocoPhillips ConocoPhillips Planning Report Database: EDM Alaska NSK Sandbox Local Co-ordinate Reference: Company: ConocoPhillips (Alaska) Inc. -Kup2 TVD Reference: Project: Kuparuk River Unit MD Reference: Site: Kuparuk 1 L Pad North Reference: Well: 1L-15 Survey Calculation Method: Wellbore: 1L-151-1-02 Design: 1 L-15L1-02_wp00 Well 1 L-15 Mean Sea Level 1 L-15 @ 118.00usft (Parker 141) True Minimum Curvature Has BAKER HUGHES Point? 0.00 1,261.70 -868.47 5,948,569.95 1,678,198.94 Point 0.00 1,648.28 -588.41 5,948,957.97 1,678,476.91 Point 0.00 2,418.87 -494.35 5,949,728.98 1,678,566.88 Point 10 0.00 2,759.46 -409.55 5,950,069.98 1,678,649.86 Point 11 0.00 3,417.93 -294.08 5,950,728.99 1,678,761.82 Point 12 0.00 3,660.55 -216.80 5,950,971.99 1,678,837.81 Point 13 0.00 3,645.42 -1.85 5,950,958.00 1.679,052.82 Point14 0.00 3,423.14 45.99 5,950,736.00 1,679,101.83 Point 15 0.00 3,069.33 2.12 5,950,382.00 1,679,059.84 Point 16 0.00 2,715.70 -75.74 5,950,027.99 1,678,983.86 Point 17 0.00 2,403.12 -161.39 5,949,714.99 1,678,899.88 Point 18 0.00 2,077.02 -149.11 5,949,389.00 1,678,913.89 Point 19 0.00 1,765.13 -177.75 5,949,076.99 1,678,886.91 Point20 0.00 1,459.80 -311.37 5,948,770.98 1,678,754.92 Point21 0.00 1,127.83 -515.13 5,948,437.97 1,678,552.95 Point22 0.00 925.99 -550.20 5,948.235.97 1,678,518.95 Point23 0.00 592.57 -475.94 5,947,902.98 1,678,594.97 Point24 0.00 390.71 -316.98 5,947,701.98 1,678,754.98 Point25 0.00 354.47 -81.15 5,947,667.00 1,678.990.98 Point26 0.00 0.00 0.00 5,947,313.00 1,679,074.00 1L-151-1 Fault2 M 0.00 0.00 0.00 -5,758.571,138,763.35 5,948,863.00 1,678,589.00 70° V 16.430 N 140' 32' 58.665 W - plan misses target center by 1139756.33usft at 6380.00usft MD (5912.65 TVD,-826.65 N,-966.98 E) - Rectangle (sides W1,000.00 H1.00 D0.00) 1L-151-1_Fault2 0.00 0.00 5,923.00 -5,758.571,138,763.35 5,948,863.00 1,678,589.00 70° V 16.430 N 140° 32' 58.665 W plan misses target center by 1139741.00usft at 6380.00usft MD (5912.65 TVD,-826.65 N,-966.98 E) Polygon Point 1 5,923.00 0.00 0.00 5,948,863.00 1.678,589.00 Point 2 5,923.00 1.00 1.00 5,948,864.01 1,678,589.99 1L-151-1-01_Faultl 0.00 0.00 5,992.00 -8,085.131,138,253.95 5,946,534.00 1,678,092.00 70' 0' 54.586 N 140" 33' 23.098 W plan misses target center by 1139244.06usft at 6380.00usft MD (5912.65 TVD,-826.65 N,-966.98 E) Polygon Point 1 5,992.00 0.00 0.00 5,946,534.00 1,678,092.00 Point 5,992.00 1.00 1.00 5,946,535.01 1,678,092.99 Casing Points Measured Vertical Casing Hole Depth Depth Diameter Diameter (usft) (usft) Name (in) (in) 10,200.00 5,932.68 2 3/8" 2 375 3.000 10/25/2016 12:27:12PM Page 7 COMPASS 5000.1 Build 74 `- ConocoPhillips FIRS ConocoPhillips Planning Report BAKER HUGHES Database: EDM Alaska NSK Sandbox Local Co-ordinate Reference: Well 1 L-15 Company: ConocoPhillips (Alaska) Inc. -Kup2 ND Reference: Mean Sea Level Project: Kuparuk River Unit MD Reference: 1 L-15 @ 118.00usft (Parker 141) Site: Kuparuk 1L Pad North Reference: True Well: 1 L-15 Survey Calculation Method: Minimum Curvature Wellbore: 1 L-15L1-02 Design: 1 L-15L1-02_wp00 Plan Annotations Measured Vertical Local Coordinates Depth Depth +Nl-S +El-W (usft) (usft) (usft) (usft) Comment 6,380.00 5,912.65 -826.65 -966.98 TIP 6,450.00 5,936.11 -866.16 -1,018.86 KOP 6,630.00 5,946.42 -869.79 -1,186.89 Start 40dls 6,700.00 5,946.03 -827.63 -1,242.75 End 40 dls, Start 7 dls 6,770.00 5,945.38 -780.87 -1,294.80 5 6,870.00 5,947.51 -707.30 -1,362.41 6 6,995.00 5,949.19 -605.97 -1,435.38 7 7,095.00 5,941.72 -519.64 -1,485.16 8 7,195.00 5,931+38 -429.28 -1,526.58 9 7,295.00 5,924.03 -334.41 -1,557.15 10 7,455.00 5,913.76 -176.87 -1,581.49 11 8,065.00 5,897.44 389.40 -1,396.36 12 8,365.00 5,901.08 650.71 -1,252.49 13 8,440.00 5,905.17 722.14 -1,230.07 14 8,515.00 5,909.51 794.36 -1,210.42 15 8,630.00 5,909.52 907.51 -1,190.43 16 8,700.00 5,908.51 976.70 -1,179.99 17 8,825.00 5,910.43 1,100.66 -1,164.99 18 8,950.00 5,915.60 1,224.46 -1,149.42 19 9,100.00 5,932.93 1,371.60 -1,127.38 20 9,250.00 5,947.73 1,519.99 -1,113.26 21 9,430.00 5,936.37 1,696.40 -1,081.31 22 9,580.00 5,923.32 1,843.08 -1,053.91 23 9,680.00 5,922.33 1,941.76 -1,038.13 24 9,880.00 5,926.42 2,140.43 -1,020.36 25 10,200.00 5,932.68 2,454.14 -968.91 Planned TD at 10200.00 1012512016 12:27.12PM Page 8 COMPASS 5000.1 Build 74 KUP PROD 1 L-15 l..onocOf''nimps r Well Attributes Max Angle & MD TD Alaska. Inc. Wellbore API/UWI Field Name W¢Ilba a Status ncl (') 500292120400 KUPARUK RIVER UNIT PROD 46.58 MD (RKB) Act 6.7X00l Bim IRKS) 6,705.0 ••• Comment H2S (ppm) Date 50 12/21/2015 Annalalton End Dale Last WO: KB-Grd (ftI Rig Release Date 34.80 10/24/1984 1L.15, 10119120162:15:37 PM Vertical schematic (actual -_-....... _..... _.... ._...._....._.-_.._._.............___............-........__..._....._. Annotation Depth (ftKB) End Dat¢ Last Tag: SLM 6,372.0 4/24l2015 Annotation Rev Reason: TAG, H2S, GLV C/O, SET PLUG Last Mod By End & ppmven Date 10/5/2016 CATCHER, CUT TU81NG(3X) Hanger: 27.6 Being trmgs Casing Description CONDUCTOR OD (in) ID (in) 16 15.060 Top (ftKB) 35.0 Set Depth (ftKB) 102.0 Set Depth (TVD)... 102.0 WI1Len (I... 62.50 Gmde H-40 Top Thread WELDED Casing Description SURFACE OD (In) ID (in) 9 5/8 8.921 Top (ftKB) 34.3 Set Depth (ftKB) 3,475.0 Set Depth (TVD)... 3,474.7 Wt/Lan (I... 36.00 Grade J-55 Top Thneed BTC Casing Description PRODUCTION OD (in) ID (in) 7 6.276 Top (RKB) 34.3 Set Depth (ftKB) 6,704.0 Sel Depth (TVO)... 6,265.1 Wt/Len (I... 26.00 Gmd¢ J-55 Top Thread Tubing Strings CONDUCTOR; 35.0-102.0 Tubing Description string Ma... ID (in) Upper Selective 31/2 2.992 Top (ftKB) 0.0 Set Depth (ft.. 6,285.3 Set Depth (TVD) (... 5,962.4 Wt (Ib/ft) Grade 9.30 L-80 Top EUE Connection 8rd Mod Completion Completion Details Mandrel, 2,424.5 Top (ftKB) Top (TVD) (ftKB) Top Incl (°) Item Des Co. Nominal ID (in) 27.6 27.6 0.00 Hanger Tubing Hanger, FMC TC-IA-EN, 7-1116" x 3-1/2" EUE 8rd 2.950 Box x Box SURFACE; 34.3-3475.0 6,027.5 5,755.8 35.60 Locator Locator Sub, Baker, GBH-22 3.000 6,028.5 5,756.6 35.56 Seal Assembly Seal Assembly, Baker, 80-40 (Seal Assy 21.54' Total 3.000 Length) Mandrel; 3,494.0 6,035.3 5,762.2 35.26 Polished Bore Receptacle PER, Baker, 8040 (shear release pinned at 40K) 4.000 6,079.6 5,798.4 35.44 Nipple - DB, X Nipple, HES, 2.813" 2.813 XN, DS, D Mand,04,373.E 6,213.3 5,906.0 37.51 Carbide Blast Blast Joint. 9.3# L-80 3%EUEM box x 3% HYD 511 pin 2.992 Rings 6,245.0 5,931.0 38.30 Carbide Blast Rings Blastjoint 3%9.3# L-80 HYD 511 box X pin 2-992 Mandrel; 5.062.8 6,283.8 5,961.3 39.27 Locator Locator Sub, Baker, GBH-22 3.000 6,284.3 5,961.E 39.28 Seal Assembly Seal Assembly, Baker, 80-40 (seal assembly 11.77') 3.000 Mandrel; 5,594.E Tubing Descdption String Ma... ID (in) lop (ftKB) Set Depth (ft.. Set Depth (ND) (... Wt (Ib/fQ Gmde Top Connection Lower Completion 5.9E 2.992 6,285.3 6,345.4 6,008.4 Bid EUE Completion Details Top (ftKB) Top (TVD) (RKB) Top Ind (°) Item Des Co. Namtn.1 ID (in) 6,288.6 5,965.0 39.39 SBE (Seal Baker 80-401226'SBE 4.000 Mandrel; 5,970.7 Bore Extension) 6,307.8 5,979.7 39.86 Deployment Upper Wedge Assembly #2 2.992 Sleeve Locator; 6,027.5 6,321.8 5,990.4 40.21 Nipple -DB, XN, DS, D GX Nipple, HES, 2.813", SN: 7256 2.813 seal Assemby; 6,026.5 Polished Be. Receptacle; 6,035.3 6,327.5 5,994.8 40.35 Deployment Sleeve Lower Wedge Assembly#1 2.992 Packer (Tubing); 6,057.7 6,341.5 6,005.4 40.69 Nipple - DB, GX Nipple, HES, 2.813" w/PXX plug and prong SN: 2.813 XN, DS, D 6,344.9 6,008.0 40.77 Mule Shoe WLEG 4.57" OD x 3" ID. Drifted 2,91". 2.992 Other In Hole (WireBne retrievable plugs, valves, pumps, fish, etc.) Top (TVD) Top Incl MaMrel; 6,122.9 Top (ftKB) IRKS) (°) Des Co. Run Date ID (in) 6,480.0 6,108.0 43.44 Fish Packer& tubing tail from 6313' milled and chased 10/11/2016 down to 6480'. Prior to Setting Tandem Wedge & F Perm Packer 6,520.0 6,136.9 44.24 FISH JK Running Tool 4.5" x 1.2" OD, lost 8/24/2004 8/24/2004 Mandrel; 6.194.2 6,526.0 6,141.2 44.38 FISH Parts of 2 Broken GL In Rathole; Also Trash around 2/14/1990 Mandrels Carbide BlastRirgs; 6,213.3 Perforations & Slots IPERF; 6,235.0-6,248.0- Shol IPERF 6Rings;-6.245.0�_ Carbide Blast Rings; fi,245.0 Top (RKB) Blm (ftKB) ) Top KB) (ftKB) Btm (TVD) (ftKB) Zone Date (shots/f 0 Type Core 6,235.0 6,248.0 5,923.1 5,933.4 C-4, 1 L-15 3/7/1985 12.0 IPERF 5" Scalloped Guns, 120 deg, phasing Locator,6,283.8 6,248.0 6,268.0 5,933.4 5,949.0 C-4, 1L-15 3/7/1985 12.0 IPERF 5" Scalloped Guns, 120 Seal Assemby; 6,284.3 deg. phasing Packer(Tubing); 6.285.3 6,393.0 6,416.0 6,044.1 6,0612 A-5,1L-15 317/1985 4.0 IPERF 4"JJ 11, 120 deg. SBE (Seal Be,, ate.:ion); phasing 6,288-6 XO Reducing (Tubing); 6,298.0 Mandrel Inserts St Ili Deployment Sleeve; 6,307.8 on N Top (ftKB) Top (TVD) (ftKB) Make Model OD (in) So, Valve Type Latch Port Type Size (in) TRO Run (psi) Run Date Core Nipple - DB, XN, DS, O; 6,321.8 1 2,424.5 2,424.3 Camco MMG 11/2 DMY 10/14/2016 2 3,494.0 3,493.7 Camco MMG 1112 SOV 10/14/2016 Deployment sleeve; 6,327.5 3 4,373.6 4,337.8 Camco MMG 1112 DMY 10/14/2016 Nipple - DB, XN, Ds, D; 6,341.5 4 5,062.9 4,944.3 Camco MMG 1 1/2 DMY 10/14/2016 Mule Shoe; 6,344.9 5 5,594.6 5,400.6 Camco MMG 11/2 DMY 10/14/2016 iPERF; 6,393.0-6,416.0- 6 5,970.7 5,709.3 Camco MMG 1112 DMY 10/14/2016 7 6,122.9 5,833.6 Camco MMG 11/2 DMY 10/14/2016 FISH; 6.620.0 8 6,194.2 5,890.8 Camco MMG 1112 DMY 10/14/2016 FISH; 6,526.0 PRODUCTION; 34.3-6,704.0 1 L-15 CTD Proposed Schematic 16" 62." H-40 9-518" 3e.r J-55 shoe @ 3475' RID CS -send peas 8235-B259' MD 33C' RSD proposed s D'.N'S depth A5-ssnd perk: 8393-641a'MO r 2M J-55 shoe @ 67D4' MD 3-112" 9.3# L-80 EUE 8rd Tubing to surface 3-1t2" Camco gas lift mandrels @ TBD Baker packer @ XXXX' MD Production Mandrel at XXXX' MD Baker packer at XXXX' MD (below C-sand perfs) Baker SBE at XXXXIVID 3-112" X-nipple — x)W MD (2.812" min ID) Northern Solutions WEDGE (see details) 1L-15L1-02 TD @ 102CU RID 'ner top @ 6326 RID @ 92CT AID -r top @ e= R4D 1!.-iFL1 D @ 10.2C0' A1D Liner 10—A @ 6549 ID TRANSMITTAL LETTER CHECKLIST WELL NAME: U — 011 PTD: C2 f (o ✓Development _ Service _ Exploratory _ Stratigraphic Test Non -Conventional FIELD: t POOL: t Iv6r D, Check Box for Appropriate Letter / Paragraphs to be Included in Transmittal Letter CHECK OPTIONS TEXT FOR APPROVAL LETTER / MULTI The permit is for a new wellbore segment of existing well Permit / LATERAL No. JR q — , API No. 50-QZ9 - a i ao y -11-6 - 0Q . r (If last two digits Production should continue to be reported as a function of the original in API number are API number stated above. between 60-69) In accordance with 20 AAC 25.005(f), all records, data and logs acquired for the pilot hole must be clearly differentiated in both well Pilot Hole name ( PH) and API number (50- - - -� from records, data and logs acquired for well (name on permit). The permit is approved subject to full compliance with 20 AAC 25.055. Approval to produce/inject is contingent upon issuance of a conservation Spacing Exception order approving a spacing exception. (Company Name) Operator assumes the liability of any protest to the spacing exception that may occur. All dry ditch sample sets submitted to the AOGCC must be in no greater Dry Ditch Sample than 30' sample intervals from below the permafrost or from where samples are first caught and 10' sample intervals through target zones. Please note the following special condition of this permit: production or production testing of coal bed methane is not allowed for Non -Conventional (name of well) until after (Company Name) has designed and Well implemented a water well testing program to provide baseline data on water quality and quantity. (Company Name) must contact the AOGCC to obtain advance approval of such water well testing program. Regulation 20 AAC 25.071(a) authorizes the AOGCC to specify types of well logs to be run. In addition to the well logging program proposed by (Company Name) in the attached application, the following well logs are also required for this well: Well Logging Requirements Per Statute AS 31.05.030(d)(2)(B) and Regulation 20 AAC 25.071, composite curves for well logs run must be submitted to the AOGCC within 90 days after completion, suspension or abandonment of this well. Revised 2/2015 WELL PERMIT CHECKLIST Field & Pool KUPARUK RIVER, KUPARUK RIV OIL - 490100 PTD#: 2161360 Company CONOCOPHILLIPS ALASKA INC _ _ Initial Class/Type Well Name: KUPARUK RIV UNIT 1 L-15L1-01 Program DEV Well bore seg DEV / PEND GeoArea 89QUnit 11160 On/Off Shore On Annular Disposal Administration 17 Nonconven, gas conforms to AS31.05.030Q.1_.A),Q.2.A-D) NA_ 1 Permit fee attached NA 2 Lease number appropriate_ - - - - - - - - Yes ADL0025659, entire wellbore. 3 Unique well name and number Yes KRU 1 L-15L1-01 - - 4 Well.located in a_defined-pool _ - - - - - Yes KUPARUK RIVER,-KUPARUK RIV OIL.- 490100,.governed by Conservation_ Order No. 432D. 5 Well located proper distance from drilling unit -boundary_ Yes CO 432D contains no spacing restrictions with respect to drilling unit boundaries. . 6 Well located proper distance from other wells_ Yes CO 432D has no interwell_spacing _restrictions._ 7 Sufficient acreage -available in drilling unit_ Yes 8 If deviated, is wellbore plat included Yes 9 Operator only affected party- - - _ - - - - - _ - Yes - Wellbore_will be more than 500' from an external property line where_ ownership or landownership_ changes.. 10 Operator has appropriate bond in force Yes Appr Date 11 Permit can be issued -without conservation order - _ _ _ _ _ Yes 12 Permit can be issued without administrative_appr_oval _ Yes PKB 10l28l2016 - - - - _ - - - - - - - - - 13 Can permit be approved before 15-day wait_ - - - Yes - 14 Well _located within area and strata authorized by Injection Order# (put_10# in- comments)_(For_ NA- - - - - - - - - - - - - - - - - - - ---------------------------------------------------- 15 All wells.within 1/4 mile -area -of review identified (For service well only). - - - - - - - NA_ - - - - - - - - 16 Pre -produced injector. duration -of preproduction less than 3 months- (For _service well only) NA_ 18 Conductor string- provided - - - - - Conductorset_in 1L-15-- - - - - - - - - Engineering 19 Surface casing protects all -known _ USDWs - - .. - NA Surface casing set in 1-L-15-..-Fully cemented. 20 CMT vol adequate to circul_ate_on conductor & surf _csg - - - - NA_ 21 CMT vol adequate_ to tie -in -long string to -surf csg NA 22 CMT_will coverall known_productive horizons- - - - Yes - - - - - - - - - - - - - - - - - - - 23 Casing designs adequate for CJ-, B &-permafrost_ - - - - - - - - - - - - - - Yes . 2 3/8" slotted liner will be set in the lateral ._ 24 Adequate tankage or reserve pit - - - - - Yes All drilling waste t_o be transported to approved disposal wells, I25 .lf-a_re-drill, has_a 1.07403 for abandonment been approved NA_ - - - - Motherbore not abandoned...- drilling laterals, and keeping original perforations.. ... . 26 Adequate wellbore separation -proposed - - - - - - - - - - - - - - Yes ... .. anti collision_ anaylsis prov_ided._ No issues - - - - - - - - - 27 If_diverter required, does it meet regulations- - - - - - - - - - - - - - - - - - - NA Wellhead in place. -BOPE_ will be placed on top of prod tree, Appr Date 28 -Drilling fluid_ program schematic_& equip -list _adequate _ - - - . _ . Yes Max formation_ pressure= 3702_psi_( 12.1 ppg EMW) Will drill with 8.6 ppg mud_ but maintain11.8pg with MPD- GLS 11/10/2016 29 B_OPEs,_do they meet regulation ... - .. - - - Yes CDR3 has 5000 psi BOPE - - - - - - - - - 30 BOPE press rating appropriate; test to -(put psig in comments)_ Yes MASP = 311.4_psi_ Will test BOPE to 3500 psi --- ---------------------------- 31 Choke_manifold complies w/API_RP-53 (May 84)_ - - - - - - _ _ _ Yes - - - - - - - - - 32 Work will occur without operation shutdown_ - - Yes - - 33 .Is presence_ of H2S gas_ probable - - - - - Yes H2S on pad._ Rig_has sensors and alarms. 34 Mechanical_ condition of wells within AOR verified (For service well only) - - - - - N_A 35 Permit can be issued w/o hydrogen_ sulfide measures No_ - - - - - WelIs_cn-lL-Pad are H2S bearing._ H2S measures required. Geology 36 Data presented on- potential overpressure zones Yes Maximum potential -reservoir pressure_is 12.1 ppg _EMW;_will be drilled using _8.6 ppg mud and MPD technique. Appr Date 37 Seismic analysis- of shallow gas_zones_ - - - - - - - - - - - - - - - N_A_ - - - - - - - - PKB 11/10/2016 38 Seabed condition survey -(if off_ -shore) - - - - - - . NA . 39 Contact name/phone for weekly_ progress reports- [exploratory only] NA Onshore development -lateral -to be drilled_. Geologic Engineering Public 1 L-151­1-01 is second lateral. Will drill south of motherbore BHL to target A5 sand. GIs Commissioner: Date: Commissioner: Date Commissio Date n