Department of Commerce, Community, and Economic Development
Alaska Oil and Gas Conservation
Commission
HOME
EVENTS
DATA
Data List
Drilling
Production
Orders
Data Miner
Document Search
REPORTS
Reports and Charts
Pool Statistics
FORMS
LINKS
Links
Test Notification
Data Requests
Regulations
Industry Guidance Bulletins
How to Apply
ABOUT US
History
Staff
HELP
Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
210-020
New Plugback Esets 7/15/2024 Well Name API Number PTD Number ESet Number Date CRU C1-07 PB2 50-103-20478-71-00 203-225 T39188 1-29-2007 CRU CD2-467 PB1 50-103-20579-70-00 208-114 T39189 10-31-2008 CRU CD4-12 PB1 50-103-20414-70-00 210-091 T39190 9-20-2010 CRU CD4-210A PB1 50-103-20533-70-00 211-072 T39191 9-9-2011 KRU 1B-15AL3 PB1 50-029-22465-72-00 207-067 T39192 11-23-2009 KRU 1E-12L1 PB1 50-029-20736-70-00 210-004 T39193 5-24-2010 KRU 1E-12L2-01 PB1 50-029-20736-72-00 210-007 T39194 5-24-2010 KRU 3H-12A PB1 50-103-20088-70-00 211-081 T39195 9-9-2012 KRU 3I-11AL2 PB1 50-029-21932-70-00 210-076 T39196 11-1-2010 ODSK-33 PB1 50-703-20562-70-00 207-183 T39197 6-20-2008 OI11-01 50-029-23430-70-00 210-106 T39198 11-2-2010 OP04-07 PB1 50-029-23409-70-00 208-199 T39200 7-6-2010 OP08-04 PB1 50-029-23424-70-00 210-041 T39201 7-28-2010 PBU 06-02A PB1 50-029-20282-70-00 211-026 T39202 7-25-2011 PBU 15-05B PB1 50-029-20731-71-00 211-057 T39203 8-20-2011 PBU 15-16B PB1 50-029-21115-70-00 210-020 T39204 7-8-2010 PBU 18-04B PB1 50-029-20875-70-00 201-090 T39205 12-6-2002 PBU J-16B PB1 50-029-20967-70-00 212-014 T39206 9-28-2012 PBU K-05D PB1 50-029-21418-71-00 211-077 T39207 1-20-2012 PBU V-204L1 50-029-23217-60-00 204-132 T39208 11-13-2006 PBU W-19B PB1 50-029-22006-72-00 210-065 T39209 1-13-2011 PBU W-19BL1 PB1 50-029-22006-73-00 210-066 T39210 1-18-1011 SP23-N03 PB1 50-629-23456-70-00 211-127 T39211 3-5-2012 TBU M-10 PB1 50-733-20588-70-00 209-154 T39212 4-23-2010 PBU 15-16B PB1 50-029-21115-70-00 210-020 T39204 7-8-2010 STATE OF ALASKA • ALASKA OIL AND GAS CONSERVATION COMMIS N • WELIOMPLETION OR RECOMPLETION REPCIJAND LOG 1a. Well Status: Oil 0 Gas 0 SPLUG 0 Other 0 Abandoned 0 • Suspended 0 1b.Well Class: 20AAC 25.105 20AAC 25.110 Development 0 Exploratory 0 GINJ 0 WINJ 0 WAG 0 WDSPL 0 No.of Completions: Zero Service 0 Stratigraphic Test 0 2. Operator Name: 6. Date Comp.,Susp.,or Aband.: 14.Permit to Drill Number/Sundry BP Exploration(Alaska),Inc 12/18/2016 ' 210-020 • 316-585 3. Address: 7. Date Spudded: 15. API Number: P.O.Box 196612 Anchorage,AK 99519-6612 3/22/2010 50-029-21115-02-00 • 4a. Location of Well(Governmental Section): 8. Date TD Reached: 16. Well Name and Number: 4/4/2010 PBU 15-16B ' Surface: 854'FNL,165'FWL,Sec.22,T11N,R14E,UM ` 9 Ref Elevations KB 61 17. Field/Pool(s): Top of Productive Interval: 224'FSL,4882'FWL,Sec.10,T11N,R14E,UM GL 32.8 . BF 36.02 . PRUDHOE BAY,PRUDHOE OIL • Total Depth: 1669'FSL,3104'FWL,Sec.10,T11N,R14E,UM 10. Plug Back Depth(MD/TVD): 18. Property Designation: , 13287'/8671' ' ADL 028306� •fA-"L- B Z.$� 4b. 4b.Location of Well(State Base Plane Coordinates,NAD 27): 11. Total Depth(MD/TVD): 19. Land Use Permit: /�3,i.7 Surface:x- 676088• y- 5960631 • Zone - ASP 4 • , 15634'/8641' • 78-084 =3 TPI: x- 680641 y- 5967098 Zone - ASP 4 12. SSSV Depth(MD/TVD): 20_ Thickness of Permafrost MD/TVD: Total Depth:x- 678827 y- 5968500 Zone - ASP 4 None 1900'(Approx.) 5. Directional or Inclination Survey: Yes 0 (attached) No 0 13. Water Depth,if Offshore: 21. Re-drill/Lateral Top Window MD/TVD: Submit electronic and printed information per 20 AAC 25.050 N/A (ft MSL) • 4587'/4389' 22. Logs Obtained List all logs run and,pursuant to AS 31.05.030 and 20 MC 25.071,submit all electronic data and printed logs within 90 days of completion, suspension,or abandonment,whichever occurs first.Types of logs to be listed include,but are not limited to:mud log,spontaneous potential,gamma ray,caliper, resistivity,porosity,magnetic resonance,dipmeter,formation tester,temperature,cement evaluation,casing collar locator,jewelry,and perforation record. Acronyms may be used.Attach a separate page if necessary DIR/GR/RES,DIR/GR/RES/NEU/DEN s �NE® APR �a J 17 23. €3 CASING,LINER AND CEMENTING RECORD CASING WT.PER GRADE SETTING DEPTH MD SETTING DEPTH ND HOLE SIZE CEMENTING RECORD AMOUNT Ff. PULLED TOP BOTTOM TOP BOTTOM 20" 91.5# H-40 29' 109' 29' 109' 30" 1910#Poleset 13-3/8" 72# L-80 28' 2495' 28' 2495' 17-1/2" 1900 sx Permafrost'E',400 sx PF'C' 9-5/8" 47# L-80 25' 4587' 25' 4389' 12-1/4" 500 sx Class'G',300 sx PF'C' 7" 26# L-80 4440' 12396' 4287' 8223' 8-1/2" 174 sx Class'G' 4-1/2" 12.6# L-80 12217' 15630' 8076' 8641' 6-1/8" 413 sx Class'G' 24. Open to production or injection? Yes 0 No 0 25. TUBING RECORD If Yes,list each interval open(MD/TVD of Top and Bottom;Perforation GRADE DEPTH SET(MD) PACKER SET(MD/TV Size and Number): 4-1/2"12.6#13Cr80 12226' 12107'/7986' 26. ACID,FRACTURE,CEMENT SQUEEZE,ETC. ECE I VEDf�� �a6fy� Was hydraulic fracturing used during completion? Yes 0 No 0 Per 20 AAC 25.283(i)(2)attach electronic and printed JAN 11 201 7 information ! m`(a`t(, DEPTH INTERVAL(MD) AMOUNT AND KIND OF MATERIAL USED cr 13287' Set Whipstock A OG GC i-L 27. PRODUCTION TEST Date First Production: Not on Production Method of Operation(Flowing,gas lift,etc.):N/A Date of Test: Hours Tested: Production for Oil-Bbl: Gas-MCF: Water-Bbl: Choke Size: Gas-Oil Ratio: Test Period '► Flow Tubing Casing Press: Calculated Oil-Bbl: Gas-MCF: Water-Bbl: Oil Gravity-API(corn): Press 24 Hour Rate ••••r Form 10-407 Revised 11/2015 CONTINUED ON PAGE 2 Submit ORIGINAL only / Y'Ti- 4(/21</17- /., /y/� ,( RBDMS LI- JAN 1 8 2017 , . 3,(5.11 J 28. CORE DATA Conventional Core(s) Yes 0 No a Sidewall Cores Yes 0 No Q If Yes to either question,list formations and inte ored(MD+TVD of top and bottom of each),and summariz logy and presence of oil,gas or water • (submit separate sheets with this form,if needed).Submit detailed descriptions,core chips,photographs and laboratory analytical results per 20 AAC 25.071. 29. GEOLOGIC MARKERS(List all formations and markers encountered): 30. FORMATION TESTS NAME MD TVD Permafrost-Top Well Tested? Yes 0 No l . Permafrost-Base If yes,list intervals and formations tested,briefly summarizing test results.Attach separate sheets to this form,if needed,and submit detailed test information per 20 Top of Productive Interval 13267' 8667' MC 25.071. Ugnu 4982' 4615' Wesk Sak 8050' 5957' Colville Mudstone 9053' 6369' HRZ 11893' 7810' Base of HRZ 12152' 8023' LCU 12218' 8077' Sag River 12396' 8223' Shublik A 12452' 8269' Shublik B 12478' 8290' Shublik C 12496' 8304' Sadlerochit-Zone 4 12523' 8324' Base of CGL-Zone 2C 12686' 8441' 22TS 12797' 8510' 21 TS-Zone 2A 12895' 8559' Zone 1B 13067' 8627' TDF-Zone 1 A 13267' 8667' Formation at total depth: 31. List of Attachments: Summary of Pre-Rig Work,Summary of Daily Drilling Reports,Wellbore Schematic Diagram Information to be attached includes,but is not limited to:summary of daily operations,wellbore schematic,directional or inclination survey,core analysis,paleontological report,production or well test results,per 20 AAC 25.070. 32.I hereby certify that the foregoing is true and correct to the best of my knowledge. Contact: Leemhuis,Jacob Email: Jacob.Leemhuis@bp.com Printed Name: Joe Lastuf Title: Drilling Technologist Signature: Phone: +1 907 564 4091 Date: I Ii t I I 1 \`JI INSTRUCTIONS General:This form is designed for submitting a complete and correct well completion report and log on all types of lands and leases in Alaska.Submit a well schematic diagram with each 10-407 well completion report and 10-404 well sundry report when the downhole well design is changed. All laboratory analytical reports regarding samples or tests from a well must be submitted to the AOGCC,no matter when the analyses are conducted. Item 1 a. Multiple completion is defined as a well producing from more than one pool with production from each pool completely segregated.Each segregated pool is a completion. Item 1 b.Well Class Service wells:Gas Injection,Water Injection,Water-Alternating-Gas Injection,Salt Water Disp,Water Supply for Injection,Observation or Other. Item 4b.TPI(Top of Producing Interval). Item 9. The Kelly Bushing and Ground Level elevations in feet above mean sea level.Use same as reference for depth measurements given in other spaces on this form and in any attachments. Item 15.The API number reported to AOGCC must be 14 digits(ex:50-029-20123-00-00). Item 20.Report true vertical thickness of permafrost in Box 20.Provide MD and TVD for the top and base of permafrost in Box 29. Item 22.Review the reporting requirements of 20 MC 25.071 and,pursuant to AS 31.05.030,submit all electronic data and printed logs within 90 days of completion,suspension,or abandonment,whichever occurs first. Item 23.Attached supplemental records should show the details of any multiple stage cementing and the location of the cementing tool. Item 24.If this well is completed for separate production from more than one interval(multiple completion),so state in item 1,and in item 23 show the producing intervals for only the interval reported in item 26.(Submit a separate form for each additional interval to be separately produced, showing the data pertinent to such interval). Item 27.Method of Operation:Flowing,Gas Lift,Rod Pump,Hydraulic Pump,Submersible,Water Injection,Gas Injection,Shut-in,or Other(explain). Item 28.Provide a listing of intervals cored and the corresponding formations,and a brief description in this box.Submit detailed description and analytical laboratory information required by 20 AAC 25.071. Item 30.Provide a listing of intervals tested and the corresponding formation,and a brief summary in this box.Submit detailed test and analytical laboratory information required by 20 AAC 25.071. Item 31.Pursuant to 20 AAC 25.070,attach to this form:well schematic diagram,summary of daily well operations,directional or inclination survey,and other tests as required including,but not limited to:core analysis,paleontological report,production or well test results. Form 10-407 Revised 11/2015 Submit ORIGINAL Only s • 15-16C Well History (Pre-Rig Sidetrack) ------ ���' 1CTU 14 w/ 1.75 , .156 wall CT CV=33.3 Job Objective: Mill XN, WS Drift MIRU. MU 3.80"diamond parabolic milling BHA. Pump 227 bbls of 1% KCI w/Safelube and 15 bbl cap of 60/40 meth. RIH and tag XN nipple @ 12187' CTD. Mill out XN nipple @ 12216' ORKB. Dry drift with 3.80" mill to 13,550'. POOH to surface. FP CT, Pump 5 bbl cap of 60/40 meth. OOH with milling BHA. Centralizer above motor is still a 3.800" NO- GO. Diamond parabolic worn to the point that no gauge ring on location will measure. String mill is still a 3.800" NO-GO 3.804" GO. XN is milled. Make up and RIH with WS drift BHA, OAL: 23.83'. Max OD 3.700". Drift to 13510CTMD. POOH. Well freeze 11/27/2016 protected with 38bb1 of 60/40 CTU 14 w/ 1.75", .156 wall CT CV=33.3 Job Objective: Mill XN, WS Drift MIRU. MU 3.80"diamond parabolic milling BHA. Pump 227 bbls of 1% KCI w/Safelube and 15 bbl cap of 60/40 meth. RIH and tag XN nipple @ 12187' CTD. Mill out XN nipple @ 12216' ORKB. Dry drift with 3.80" mill to 13,550'. POOH to surface. FP CT. Pump 5 11/27/2016 bbl cap of 60/40 meth. CTU 14 w/ 1.75", .156 wall CT CV=33.3 Job Objective: Mill XN, WS Drift 11/28/2016 Continue POOH. OOH with drift BHA. All looks normal. RDMO. T/I/O =TWC/VAC/0+. Temp = SI. WHP's (Pre RIG). No AL&WH. 12/7/2016 SV, WV, SSV= C. MV= O. IA, OA= OTG. 15:00. T/I/O=0/0/30 Set 4" CIW"H" BPV#150 through tree pre Nordic 2. FWP's BPV/0/0 see log 12/7/2016 for details • • • North America-ALASKA-BP Page 1 Operation Summary Report Common Well Name:15-16 AFE No Event Type:RE-ENTER-ONSHORE(RON) j Start Date:12/15/2016 I End Date: X3-0186W-C:(2,544,339.00) Project:Prudhoe Bay Site:PB DS 15 Rig Name/No.:NORDIC 2 Spud Date/Time:6/6/1984 12:00:00AM Rig Release: Rig Contractor:NORDIC CALISTA BPUOI: Active datum:15-166 @61.00usft(above Mean Sea Level) Date From-To I Hrs I Task I Code NPT NPT Depth I Phase Description of Operations (hr) (usft) 12/15/2016 21:30 - 00:00 2.50 MOB P PRE RIG WAS RELEASED FROM WELL C-31 C AT 21:30. PJSM WITH RIG CREW FOR MOVING OFF WELL WITH NO TWC IN PLACE. . DISCUSS USE OF CHOCK BLOCK,STOP COMMAND,RADIO CHECKS AND ESD. JACK UP RIG AND MOVE OFF WELL WITH NO ISSUES. STAGE RIG NEAR ENTRANCE TO PAD. PICK UP MATS AROUND WELLAND CLEAN UP AREA. i AROUND 23:00 START MOVING RIG FROM C-PAD TO DS-15. ROUTE IS OFF C-PAD;LEFT ON TWIN TOWERS ROAD,LEFT ON SPINE,LEFT ON OXBOW TO DS-15 ACCESS ROAD. 12/16/2016 00:00 07:30 7.50 MOB P PRE CONTINUE MOVING RIG FROM C-PAD TO DS-15. ROUTE IS OFF C-PAD,LEFT ON TWIN TOWERS ROAD,LEFT ON SPINE,LEFT ON OXBOW TO DS-15 ACCESS ROAD. 07:30 - 08:30 1.00 MOB P PRE RIG IS STAGED IN FRONT OF 15-16 WHILE WAITING ON APPROVAL OF WELL HANDOVER [CERTIFICATE 08:30 - 13:00 4.50 MOB N WAIT PRE PLACE CREW ON STANDBY. HAVE DISCUSSION WITH ENTIRE RIG TEAM TO DISCUSS LOSS OF RIG CONTRACT AT COMPLETION OF WELL. -ALLOW CREW TO MAKE CALLS TO FAMILIES,GATHER THOUGHTS. HAVE DISCUSSIONS WITH CREW REGARDING FOCUS,WATCHING OUT FOR EACH OTHER. -CONDUCT GENERAL CLEANUP,RIG UP I PREP WHILE CREW CONDUCTS FAMILY BUSINESS 13:00 - 14:00 1.00 MOB P PRE PJSM ON PLACING MATS AROUND TREE. LAY MATS,ALL GOOD. -PJSM ON MOVING RIG OVER WELL. EMPHASIS ON COMMUNICATION,STOP COMMANDS(VISUAL,AUDIBLE),PLACEMENT OF 12"BY 12"BLOCK,WHO IS IN COMMAND OF FUNCTION OF ESD. -STAGE PERSONNEL,FUNCTION TEST ESD -MOVE RIG OVER WELL. RIG ACCEPT 1400 HRS. 14:00 - 17:00 3.00 I RIGU P PRE STAGE SUPPORT EQUIPMENT AROUND RIG SITE '-PREP TREE FOR OPERATIONS,INSTALL GAUGES. WSL WITNESS OPENING OF SSV. CYCLE TREE VALVES OPEN,0 PSI ON TREE. -PJSM ON LIFTING REEL INTO REELHOUSE. LIFT REEL,INSTALL. -TEST ALL ALARMS -LEAK TIGHT TEST TREE VALVES TO 3500 PSI,GOOD TEST. CONTINUE TO MONITOR TREE THROUGH SENSOR ON WING VALVE. 17:00 - 17:30 0.50 RIGU P PRE CONDUCT RIG EVAC DRILL,FOLLOW WITH AAR Printed 12/28/2016 11:15:33AM *AII depths reported in Drillers Depths* • • North America ALASKA-BP Page 2 a1- Operation Summary Report Common Well Name:15-16 AFE No Event Type:RE-ENTER-ONSHORE(RON) Start Date:12/15/2016 End Date: X3-0186W-C:(2,544,339.00) Project:Prudhoe Bay Site:PB DS 15 Rig Name/No.:NORDIC 2 ' Spud Date/Time:6/6/1984 12:00:00AM Rig Release: Rig Contractor:NORDIC CALISTA BPUOI: Active datum:15-16B @61.00usft(above Mean Sea Level) Date From-To j Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (usft) 17:30 - 22:00 4.50 RIGU P PRE CONTINUE WITH RIG UP OPERATIONS -NU BOP AND RIG UP REEL FOR OPERATIONS CONCURRENTLY. INSTALL TEST PLUG. INSTALL BOPS. INSTALL CT 1502 LINE INSIDE REEL. INSTALL GRAPPLE. PREP TO PULL CT ACROSS. 22:00 - 23:00 1.00 RIGU P PRE CONDUCT PJSM WITH SLB AND NORDIC CREWS FOR PULLING CT ACROSS. DISCUSS DROPS,TETHERED TOOLS AND EXCLUSION ZONES. PULL TEST GRAPPLE THEN REMOVE SHIPPING BAR FROM REEL. PULL CT ACROSS PIPE SHED ROOF AND INTO INJECTOR. 23:00 - 00:00 1.00 BOPSUR P PRE PREP FOR BOP TEST. REVIEW PROCEDURE,CONDUCT PJSM. 12/17/2016 00:00 - 02:00 2.00 BOPSUR P PRE CONTINUE PREP FOR BOP TEST. GET TEST JTS READY,GREASE CHOKE MANIFOLD,FILL LINES WITH WATER. BLOW AIR ACROSS STACK TO PUSH EXCESS GREASE OUT. SHELL TEST BOPS. FIND LEAK ON DOOR SEAL,REPLACE SEAL. RE-TEST,GOOD. 02:00 - 02:20 0.33 BOPSUR P i PRE CONDUCT RIG EVAC EXERCISE WITH NIGHT SHIFT. ALL PERSONS MUSTER AND ACCOUNTED FOR IN 2 MIN. CONDUCT MR AFTERWARDS. 02:20 - 08:30 6.17 BOPSUR P PRE CONTINUE WITH BOP TEST. TEST BOPE TO 250 PSI LOW,3,500 PSI HIGH FOR 5 MINUTES EACH -TEST ANNULAR AND VBR WITH 2-3/8'AND 3-1/2""TEST JOINTS -ALL TESTS CHARTED,SEE ATTACHED BOP TEST CHARTS -TEST WITNESSED BYAOGCC REP CHUCK SCHEIVE,WSLAND TOURPUSHER. -BOP CONFIGURATION FROM TOP DOWN: -ANNULAR -BLIND/SHEARS -2-3/8"PIPE/SLIP -FLOW CROSS -2-3/8"X 3-1/2"VBR -2-3/8"PIPE/SLIP CONDUCT DRAWDOWN TEST AS PER BP AND AOGCC REGS. 08:30 - 09:45 1.25 BOPSUR P PRE CLEAR AND CLEAN RIG FLOOR. PREP SURFACE LINES FOR TESTING INJECTOR. PICK UP INJECTOR,STAB ON WITH INJECTOR. PRESSURE TEST PACKOFFS, PRESSURE BULKHEAD,AND INNER REEL IRON TO 250 PSI LOW/3500 PSI HIGH. GOOD TEST. 09:45 - 10:30 0.75 RIGU P PRE DRILL SITE MAINTENANCE CREW ON LOCATION TO TEST TORQUE ON TREE. INSPECT ALL TREE BOLTS,GOOD TO GO. Printed 12/28/2016 11:15:33AM *All depths reported in Drillers Depths* • North America-ALASKA-BP • Page 3 Operation Summary Report Common Well Name:15-16 AFE No Event Type:RE-ENTER-ONSHORE(RON) 1 Start Date:12/15/2016 1 End Date: X3-0186W-C:(2,544,339.00) Project:Prudhoe Bay Site:PB DS 15 Rig Name/No.:NORDIC 2 1 Spud Date/Time:6/6/1984 12:00:00AM �Rig Release: Rig Contractor.NORDIC CALISTA BPUOI: Active datum:15-16B @61.00usft(above Mean Sea Level) Date From-To Hrs Task 1 Code NPT NPT Depth Phase 1 Description of Operations (hr) (usft) 10:30 - 17:00 6.50 RIGU P PRE ,CIRCULATE HOT FRESH WATER AROUND, I REVERSE CIRCULATE TO PUMP SLACK BACK. -POP OFF. RU COIL CUTTER,CUT 355'COIL. -RD CUTTER. PREP COIL END,MU CONNECTOR,PULL TEST CONNECTOR TO 40K. I-PRESSURE TEST REELHOUSE IRON,COIL, I AND COIL CONNECTOR TO 250 PSI LOW/ 14700 PSI HIGH. GOOD TEST. -BLOW BACK REEL WITH AIR,STAND INJECTOR TO SIDE AND PULL BOP TEST I PLUG. CLEAR AND CLEAN RIG FLOOR 17:00 - 18:00 1.00 RIGU P PRE ,PJSM WITH VALVE CREW ON MOBILIZING 1 LUBRICATOR TO RIG FLOOR. 1-VALVE CREW VERIFIED TREE HEIGHT MEASUREMENTS -MOBILIZE LUBRICATOR TO FLOOR 18:00 - 19:00 1.00 RIGU P PRE I SHIFT CHANGE AND RIG CHECKS. OFFLOAD FRESH WATER FROM PITS AND LOAD KCL. 19:00 - 21:00 2.00 BOPSUR P PRE I PJSM WITH NORDIC CREWAND BPV CREW I FOR PT OF LUBRICATOR. I REVIEW PROCEDURE FOR PULLING BPV. LOW PRESSURE TEST SHOWS 20 PSI INCREASE IN 5 MIN DUE TO THERMAL EFFECTS,USING MEOH FROM OUTSIDE TANK(10 DEG F)BRINGING IT ONTO THE RIG FLOOR LUBRICATOR ABOUT 60 DEG. AFTER 2 BLEEDOFFS PRESSURE LEVELS OUT,TEST 250/3,500 PSI GOOD. OPEN TREE VALVE,RETRIEVE BPV. ZERO PRESSURE ON WELL. PURGE LUBRICATOR WITH MEOH THEN LIFT OFF,BPV HAS BEEN RECOVERED. OFFLOAD BPV LUBRICATOR AND PULLING TOOLS. 21:00 - 22:20 1.33 RIGU P PRE (INSTALL BHI CABLE HEAD. ELECTRICAL TEST IS GOOD. MOVE INJECTOR OFF TO SIDE,PREP FOR BULLHEADING. 22:20 - 00:00 1.67 RIGU P PRE I CONDUCT PJSM FOR BULLHEADING WELL. r REVIEW PUMP SCHEDULE. DRILLER AND WSL REVIEW PRESSURE CROSSCHECK VERIFICATION. BULLHEAD WELLAS PER WELL PLAN. PUMP 5 BBLS MEOH,400 BBLS 1%KCL,40 BBLS HI-VIS KCL,220 BBLS MUD. KEEP PUMP RATE AROUND 5.0 BPM WHILE BULLHEADING. 12/18/2016 I 00:00 - 01:10 1.17 RIGU P PRE CONTINUE BULLHEADING WELL AS PER WELL PLAN. PUMP 5 BBLS MEOH,400 BBLS 1%KCL,40 BBLS HI-VIS KCL,220 BBLS MUD. KEEP PUMP RATE AROUND 5.0 BPM WHILE 1 BULLHEADING. 1 BLEED IA ONCE FROM 200 PSI TO O. Printed 12/28/2016 11:15:33AM `AII depths reported in Drillers Depths' North America-ALASKA-BP Page 4 cifY Operation Summary Report Common Well Name: 15-16 AFE No Event Type:RE-ENTER-ONSHORE(RON) I Start Date:12/15/2016 End Date: X3-0186W-C:(2,544,339.00) Project:Prudhoe Bay Site:PB DS 15 Rig Name/No.:NORDIC 2 Spud Date/Time:6/6/1984 12:00:00AM Rig Release: Rig Contractor:NORDIC CALISTA BPUOI: Active datum:15-16B @61.00usft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase I Description of Operations (hr) (usft) 01:10 - 02:00 0.83 RIGU P I PRE SHUT DOWN PUMP,LEAVE WELL SHUT IN AND OBSERVE PRESSURE. LOAD BTT EQUIPMENT ONTO RIG AND ASSEMBLE WHIPSTOCK. DISPLACE WATER OUT OF REEL WITH MUD. j AFTER 40 MIN WHP HAS BLED DOWN TO 20 PSI. LINE UP TO BLEED OFF REMAINING PRESSURE THROUGH MGS. PURGE RISER WITH MUD THEN REMOVE NIGHT CAP. 02:00 - 02:45 0.75 RIGU P PRE REMOVE NIGHT CAP AND MONITOR WELL, FLUID LEVEL IS OBSERVED DROPPING VERY SLOWLY. LIFT UP INJECTOR FOR PT OF BHI CABLE HEAD AND CHECK VALVES. PRESSURE TEST TO250/3,500 PSI,GOOD. 02:45 - 03:10 0.42 STWHIP P WEXIT MAKE UP WHIPSTOCK BHA#1 -SURFACE TESTED COILTRAK TOOL.GOOD TEST. -PRESSURE TEST QTS TO 300 PSI LOW FOR 5 MINUTES/3,500 PSI HIGH FOR 5 MINUTES -INJECTOR ON:03:10 03:10 - 06:00 2.83 . STWHIP P I WEXIT RIR WITH WHIPSTOCK BHA#1 -RATE:0.57 BPM IN,0.87 BPM OUT.CIRC PRESSURE:1,300 PSI -MUD WEIGHT: 9.55 PPG IN,9.58 PPG OUT -RETURNS DIMINISHING AS THE BHA APPROACHES THE PERFORATIONS. 06:00 - 08:45 2.75 STWHIP P WEXIT LOG DOWN FOR TIE-IN FROM 12,800'TO FORMATION WITH-12'CORRECTION -LOSSES AVERAGING 24 BPH AT LOGGING COMPLETION AND WHILE PICKING BACK UP FOR CCL -PICK BACK UP AND LOG DOWN WITH CCL. LOSSES OF 27 BPH WHILE LOGGING DOWN. 08:45 - 09:15 0.50 STWHIP P WEXIT PICK UP TO WHIPSTOCK SET POINT WHILE LOGS ARE BEING READ. LOGS GOOD,PICK STRING UP TO NEUTRAL. -SET WHIPSTOCK TOP AT 13,286'WITH 315° ORIENTATION. SHEARED AT 3000 PSI. SET DOWN WITH 6K,GOOD SET. -PICK UP ABOVE WHIPSTOCK,FLOW CHECK FOR 10 MINUTES. 09:15 - 11:50 2.58 STWHIP P WEXIT FLOW CHECK GOOD,POH WITH BHA. I-LOSSES HAVE STOPPED WITH SETTING OF WHIPSTOCK PACKER. 1.71 BPM IN,1.37 BPM OUT WHILE POH AT 60 FPM. -MW IN 9.56 PPG,MW OUT 9.53 PPG -PJSM FOR FLOW CHECK AND LAYING DOWN BHA WHILE POH. -PULL BHA TO BELOW BOP,FLOW CHECK. FLOW CHECK IS NO FLOW,GOOD CHECK. -POP OFF WITH INJECTOR AT 1150 HRS Printed 12/28/2016 11:15:33AM *All depths reported in Drillers Depths* • North America-ALASKA-BP Page 5.0424 Operation Summary Report Common Well Name:15-16 AFE No Event Type:RE-ENTER-ONSHORE(RON) Start Date:12/15/2016 End Date: X3-0186W-C:(2,544,339.00) Project:Prudhoe Bay I Site:PB DS 15 Rig Name/No.:NORDIC 2 Spud Date/Time:6/6/1984 12:00:00AMI Rig Release: Rig Contractor:NORDIC CALISTA BPUOI: Active datum:15-16B @61.00usft(above Mean Sea Level) Date From-To Hrs I Task Code NPT NPT Depth Phase Description of Operations (hr) i (usft) 11:50 - 13:30 1.67 STWHIP P WEXIT STAND INJECTOR TO SIDE. I-LAY DOWN BHA. -MOBILIZE BHI TOOLS TO RIG FLOOR (SPARES)WHILE FLUSHING MUD GAS ;SEPARATOR WITH FRESH WATER I-INSPECT INJECTOR COMPONENTS WHILE PREPARING TO PRESSURE TEST QTS FOR OPENING UP TO WELL. NOTICE THAT !PACKOFFS CASE HAS LARGE GAP, 1 INDICATING ABNORMAL PACKOFF WEAR. 13:30 - 16:40 3.17 STWHIP N SFAL i WEXIT OPEN DOORS AND INSPECT PACKOFFS. PACKOFFS WORN THROUGH AFTER ONE I RUN INTO WELL OF-14,100'(NORMAL RUN FOOTAGE IS 100-125K RUNNING FEET ON A I SET OF PACKOFFS). CHANGE OUT PACKOFFS ON INJECTOR. STAB ON WITH INJECTOR AND PRESSURE TEST TO 250 PSI LOW/3500 PSI HIGH. GOOD TEST AGAINST PACKOFFS. -SEE TRACTION REPORT NUMBER 12016-IR-5393941 FOR FULL REPORT 1-LINE UP AND CONDUCT PROACTIVE TEST I AGAINST BHI FLOAT ASSEMBLY DUE TO [CONCERNS OF DEBRIS. PASSED PRESSURE ITEST TO 250 PSI LOW BUT COULD NOT HOLD AGAINST HIGH PRESSURE TEST TO 3500 PSI. CLOSE IN VALVES,MONITOR THROUGH WING VALVE. -POP OFF AND CHANGE OUT FLOAT ASSEMBLIES IN UPPER QUICK CONNECT. FLOATS ASSEMBLIES HAVE STICKY COATING ON THEM AND DEBRIS CAUGHT IN THE SPRINGS BUT IT DOESN'T SEEM TO BE THE RUBBER FROM THE PACKOFFS. MU TEST SUB TO UQC AND TEST TO 250 PSI LOW/ 3500 PSI HIGH WITH A GOOD TEST RESULT. -OPEN WELL UP TO TESTED LUBRICATOR CAP. NO PRESSURE,OPEN CHOKE WITH GOOD NO FLOW. 16:40 - 17:15 0.58 STWHIP P WEXIT -PJSM FOR MAKING UP BHA. MU BHA#2- 3.80"WHIPSTOCK MILLING BHA PER WELL PROGRAM. -MILLS GAUGE:STRING MILL NO-GO AT 3.80" AND DIAMOND SPEED WINDOW MILL NO-GO AT 3.79",3.80"GO -STAB ON WITH INJECTOR 17:15 - 20:40 i 3.42 STWHIP P I WEXIT TEST QUICK TEST SUB WHILE MWD TOOLS ARE BEING POWERED UP -BREAK CIRCULATION,RIH WITH 3.80" MILLING BHA#2 -MUD WEIGHT:9.53 PPG IN,9.56 PPG OUT -LOG DOWN FOR TIE-IN FROM 12,800'MD (FORMATION)WITH-14.5'CORRECTION. 1-UP WEIGHT AT 13,200'IS 51KLBS. -CLOSE EDC,EASE DOWN AND DRY TAG AT 1 1 13,287'. Printed 12/28/2016 11:15:33AM `AII depths reported in Drillers Depths* • North America-ALASKA-BP • Page 6 at2e- Operation Summary Report Common Well Name:15-16 AFE No Event Type:RE-ENTER-ONSHORE(RON) Start Date:12/15/2016 End Date: X3-0186W-C:(2,544,339.00) Project:Prudhoe Bay Site:PB DS 15 Rig Name/No.:NORDIC 2 Spud Date/Time:6/6/1984 12:00:00AM Rig Release: Rig Contractor:NORDIC CALISTA BPUOI: Active datum:15-168 @61.00usft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth ! Phase Description of Operations (hr) (usft) 20:40 - 00:00 3.33 STWHIP P WEXIT START TIME MILLING AT 13,287'. -OUT MM GETS RESRICTED AS SOON AS 5_K9C THE PUMP IS BOUGHT UP TO 2.8 BPM. MILL 3.80"WINDOW IN 4-1/2"CASING/LINER PER BAKER REP FROM 13,287'MD TO 13,290.5'MD -RATE:2.84 BPM IN,2.84 BPM OUT MUD WEIGHT:9.60 PPG IN,9.54 PPG OUT -DWOB:1-4 KLBS CIRC PRESSURE:3,450-3,600 PSI -BLEED IA FROM 300 PSI TO ZERO AROUND MIDNIGHT. 12/19/2016 00:00 - 05:20 5.33 STWHIP P WEXIT CONTINUE MILLING 3.80"WINDOW FROM 13,290.5'TO 13,295.5'AS PER BTT REP AND WELL PLAN. MILL WINDOW AT 1 FT/HR WHENEVER DWOB ALLOWS. CONTINUE 1 FT/HR THROUGH MIDPOINTAND LOWER PART OF WINDOW. -RATE:2.82 BPM IN,2.83 BPM OUT ! I -MUD WEIGHT:9.58 PPG IN,9.52 PPG OUT -DWOB:1-2 KLBS -CIRC PRESSURE:3,400 PSI -BLEED IA FROM 300 PSI TO ZERO AT 05:20. 05:20 - 07:00 1.67 STWHIP P WEXIT !MILL 3.80"WINDOW IN 4-1/2"CASING PER BAKER REP FROM 13,295.5' -RATE:2.83 BPM IN,2.84 BPM OUT -MUD WEIGHT:9.58 PPG IN,9.52 PPG OUT -DWOB:.55-3 KLBS -CIRC PRESSURE:3,400-3,550 PSI -CIRCULATION PRESSURES AND WOB DID DROP OFF,EXITED WINDOW AT 13,296'. 07:00 - 08:15 1.25 STWHIP P WEXIT MILL AHEAD IN 3.80"RATHOLE FROM 13,297'TO 13,309' -RATE:2.83 BPM IN,2.82 BPM OUT.CIRC PRESSURE:3420-3710 PSI -MICROMOTION MUD WEIGHT:9.56 PPG IN, 9.51 PPG OUT,ECD:11.05 PPG -WOB:1.3-4.5 KLBS 08:15 - 09:45 1.50 STWHIP P WEXIT REAM WINDOW -PERFORM 3 REAMING PASSES AT 1'/MIN. VERY SLIGHT BOBBLES IN MOTOR WORK, WINDOW LOOKS CLEAN. -RATE:2.79 BPM IN,2.81 BPM OUT -PU:42-43 KLBS,SO:15-16K KLBS -SHUT DOWN PUMPS,DRY DRIFT WINDOW -CIRCULATED DOWN HI-VIS SWEEP JUST PRIOR TO REAMING WINDOWAND AGAIN WITH REAMING COMPLETE. NO CHANGE WITH RETURN OF FIRST SWEEP WHILE !MAKING REAM PASSES. 09:45 - 12:30 2.75 STWHIP P WEXIT FLOW CHECK OFF BOTTOM,ALL GOOD. WELL STATIC. -POH WITH BHA. NO SIGNIFICANT DIFFERENCE ACROSS SHAKERS WITH RETURN OF SWEEP. -PJSM FOR FLOW CHECK AND LAYING DOWN BHA WHILE POH. -PULL BHA TO BELOW BOP STACK. FLOW CHECK,ALL GOOD WITH NO FLOW. -PULL BHA INTO INJECTOR. POP OFF WITH INJECTOR. Printed 12/28/2016 11.15:33AM *All depths reported in Drillers Depths* !ILL= CNV Wf3 1 ,.1 6B LHEAD= BCC SAFETY NOTES: WELL ANGLE>70°@ACTUATOR=—— BAKER C • ,...***4-1 12"CHROME TBG`**ORIG WELL 8 15- -094-3:-ELEV= 71.0' II 1OT SHOWN BELOW WHIPSTOCK** ii�_Q EV= 61' BF-�El/_ ______ 36.02 2230' —14-1/2"HES X Nr,D=3.813" KOP=_ _ 30_00' Max Angle=------9-5 __ —95° 15326' Datura MD= , Datum D TV = 8800'SSI l GAS LET MANDRELS 13-3/8"CSG,72#,L-80,D=12.347" 2495' ST MD I V D DEV TYPE VLV LATCH FORT DATE LI 4 3550 3531 18 MMG DOME RK 16 11/02/16 3 6987 5503 61 KBG2 DOME BK 16 11/02/16 Minimum ID = 3.725" @ 12216' 2 10590 7004 66 KBG2 DMY BK 0 04/09/10 4-1/2" HES XN NIPPLE 1 12039 7930 35 KBG2 DMY BK 0 04/09/10 4441' —I9-518"X 7"ZXP LTP w/TEBACK SLV,D=6290" :' • 4457' —I9-5/8"X 7"BKR FLEXLOCK LNR FSR,E)=6.180" 9-5/8"WHESTOCK(03/21/10) H 4587' ',t• r, ��4 �0\ 1 ` , MLLOUT WINDOW(15-16B) 4587'-4604' 9-5/8"CSG,47#,L-80 BTC,D=8.681" H 10850' 12073' H4-1/2"HES X NE',D=3-813" PERFORATION SUMMARY REF LOG: 12108' H 7"X 4-1/2"HES TNT PKR,D=3.856" ANGLE AT TOP PERF:92°@ 14000' t Nlj Note:Refer to Production[B for historical perf data SEE SPF PIT RVAL Opn/Sqz SHOT SQZ it ` 12139' —I4-112^FES X Nom,x)=3-813" 2.88" 6 13380-13820 S 04/07/10 06/19/14 2.88" 6 14000-14450 0 04/07/10 12216' 4-1/2"HES XN NE MLLED 2.88" 6 14600-14630 C 04/07/10 TO 3.80'(11/27/16) 2.88" 6 14670-14750 C 04!07/10 2.88" 6 14850 15020 C 04!07110 12219' —7"X 5"HRD-E ZXFN LTP w/TACK SLV,ID=4.190" 12228' —+4-1/2"WLEG,O=3.958" li 12235' 17"X 5"BKR FLEXLOCK LNR HGR 11 ID=4.340" 4-1/2'TBG,12-6#,13CR-85 VAM TOP,.0152 bpf,ID=3-958" —I 12228' 12245' —I 5"X 4-1/2"XO,ID=3.910" ` 14555' HI4-1/2"WFD CIBP(4/27/16) 7"LNR,26#,L-80 VAM TOP HC,.0383 bpf,ID=6.276" H 12398' 4-1/2"WHM3STOCK(12/17/16) H 13287' -7 • 11, 15533' CTMD 1 FISH:WFT aBP �, MLLED(6/29/14) PBTD —I 15543' '4,4444 11 I4-1/2"LNR,12.6(#,L-80 BT-M,.0152 bpf,ID=3-958" —I 15632' DATE REV BY COMMENTS DATE REV BY COMMENTS PRUDHOE BAY MT 06/30/84 ORIGINAL COMPLETION 07/25/14 JCF/JMD CMT SQZ/FISH(6/19-29/14) WELL: 15-16B 11/18/90 LAST WORKOVER 05/02/16 SW/JMD SET CDP(04/27/16) PERMIT No: 210020 11/20/01 CTD SIDETRACK(15-16?) 11/01/16 JMD FRE-RIG CLEANUP API No: 50-029-21115-02-00 12/31/01 CIVTP CTD SIDETRACK(15-16A?) 11/07/16 ZV/JMD GLV C/O(11/02/16) SEC 22,T11 N,R14E,854'FML&165 FVVL 04/01(10 N7ES CTD SIDETRACK(15-16B) 11/10/16 JNL/JMD ADDED REF&BF ELEVATIONS 04/18/10 TLH DRLG HO COF NS 01/05/17 JMYJM) MLLED XN NEPLETO 3-80" BP Exploration(Alaska) • w ',,OF ?„ g*.Q ���y/ ,e THE STATE Alaska Oil and Gas 11/ ,,�,��� p f A T A SJ�1 Conservation Commission _ 1 1L1 1 333 West Seventh Avenue GOVERNOR BILL WALKER Anchorage, Alaska 99501-3572 Main: 907.279.1433 OF ALAS Fax: 907.276.7542 www.aogcc.alaska.gov John Egbejimba °}" Drilling Supervisor � E �i ,6 BP Exploration(Alaska), Inc. P.O. Box 196612 Anchorage, AK 99519-6612 Re: Prudhoe Bay Field, Prudhoe Bay Oil Pool, PBU 15-16B Permit to Drill Number: 210-020 Sundry Number: 316-585 Dear Mr. Egbejimba: Enclosed is the approved application for sundry approval relating to the above referenced well. Please note the conditions of approval set out in the enclosed form. As provided in AS 31.05.080, within 20 days after written notice of this decision, or such further time as the AOGCC grants for good cause shown,a person affected by it may file with the AOGCC an application for reconsideration. A request for reconsideration is considered timely if it is received by 4:30 PM on the 23rd day following the date of this letter, or the next working day if the 23rd day falls on a holiday or weekend. Sincerely, Daniel T. Seamount, Jr. 14\ Commissioner DATED this )l day of November, 2016. RBDMS Lc- NOV 1 7 2016 STATE OF ALASKA ,ALASKA OIL AND GAS CONSERVATION COMMI N ' APPLICATION FOR SUNDRY APPROVALS 20 MC 25.280 1. Type of Request: Abandon ❑ Plug Perforations ❑ Fracture Stimulate 0 Repair Well ❑ Operations shutdown 0 Suspend 0 Perforate ❑ Other Stimulate 0 Pull Tubing 0 Change Approved Program ❑ Plug for Redrill Fa • Perforate New Pool 0 Re-enter Susp Well ❑ Alter Casing ❑ Other ❑ 2. Operator Name: BP Exploration(Alaska),Inc 4. Current Well Class: 5. Permit to Drill Number: 210-020 • 3. Address: P.O.Box 196612 Anchorage,AK Exploratory CI Development10 99519-6612 Stratigraphic 0 Service 0 6. API Number: 50-029-21115-02-00 • 7. If perforating: 8. Well Name and Number: What Regulation or Conservation Order governs well spacing in this pool? Will planned perforations require a spacing exception'? Yes 0 No Il PBU 15-166 • RECEIVED 9. Property Designation(Lease Number): 10. Field/Pools: y I /� L ADL 028306&028303 PRUDHOE BAY,PRUDHOE OIL• NO V 10 2016 11. PRESENT WELL CONDITION SUMMARY Total Depth MD(ft): Total Depth TVD(ft): Effective Depth MD: Effective Depth ND: MPSP(psi): Plugs(MD): AgDGCC 15634 • 8641 • 14555 8689 2532 14555 15533 Casing Length Size MD ND Burst Collapse Structural Conductor 80 20" 29-109 29-109 1490 470 Surface 2467 13-3/8" 28-2495 28-2495 4930 2670 Intermediate 4562 9-5/8" 25-4587 25-4389 6870 4760 Liner 7956 7" 4,440-12396 4288-8223 7240 5410 Liner 3413 4-1/2" 12217-15630 8076-8641 8430 7500 Perforation Depth MD(ft): Perforation Depth TVD(ft): Tubing Size: Tubing Grade: Tubing MD(ft): 14000-15020 8695-8666 4-1/2"12.611 13Cr80 23-12226 Packers and SSSV Type: 4-1/2"HES TNT Packer Packers and SSSV MD(ft)and TVD(ft): 12107/7986 No SSSV Installed No SSSV Installed 12.Attachments: Proposal Summary RI Wellbore Schematic Q 13.Well Class after proposed work: Detailed Operations Program 0 BOP Sketch II Exploratory ❑ Stratigraphic 0 Development RI • Service ❑ 14.Estimated Date for Commencing Operations: November 15,2016 15. Well Status after proposed work: Oil ❑ WINJ 0 WDSPL ❑ Suspended ® • 16.Verbal Approval: Date: GAS 0 WAG 0 GSTOR El SPLUG 0 Commission Representative: GINJ 0 Op Shutdown ❑ Abandoned 0 17.I hereby certify that the foregoing is true and the procedure approved herein will not Contact Leemhuis,Jacob be deviated from without prior written approval. Email Jacob.Leemhuis@bp.com Printed Name John Egbejimba Title Drilling Supervisor i i Signature % - Phone +1 907 564 4139 Date 1 170/2_0 COMMISSION USE ONLY Conditions of approval:Notify Commission so that a representative may witness Sundry Number: .;UE.- 5-S6 Plug Integrity 0 BOP Test Mechanical Integrity Test ❑ Location Clearance 0 Other: X =' ---i-- -s-i- v, I X- A .-cticzw> tC Rva:. `ukc.er%m0,37" M-17-- 2o AN - C1.1 Post Initial Injection MIT Req'd? Yes 0 No 0 , Spacing Exception --.uired? Yes 0 No Q"/ Subsequent Form Required: i C) '40-1 dil/ APPROVED BYTHE / Approved by: o COMMISSIONER COMMISSION Date: / 111`1 i i ORIGINAL RBDMS Li— NOV 1 7 2016 Mall ` Ilt 111, Submit Form and Form 10-403 Revised 11/2015 Approved application is valid for 12 months from the date of approval. Attachments in Duplicate ,//rb /C/c74 • • To: Alaska Oil & Gas Conservation Commission ti From: Jacob Leemhuis by CTD Engineer Date: November 10, 2016 Re: 15-16B Sundry Approval Request Sundry approval is requested to plug the 15-16C perforations as part of the preparation, drilling and completing the proposed 15-16C coiled tubing sidetrack. History of 15-16B: 15-16B is a Rotary Zone 1A horizontal sidetrack which was initially put on production April 2010. - In 2001 a PPROF indicated 90% of gas was from the well's heel perfs. An organoseal squeeze was performed in 2014 and was a very successful GSO, eliminating 30 mmscf/d. The GOR increased gradually to marginal causing the well to be shut-in for HGOR in 2015. A CIBP was set in 2016 to shut off the structurally higher toe perfs but the well returned to marginal GOR production within one month. An attempt was made to cycle the well following a period of three months shut-in but the well was immediately above MGOR. All well work options have been exhausted and the well is deemed to have no remaining value. • Proposed plan for 15-16C: Drill a through tubing sidetrack with the Nordic 2 Coiled Tubing Drilling rig on or around December 15th, 2016. The 15-16C sidetrack will be a single string exit from the existing 4-1/2" liner. A packer whipstock will be set allowing isolation from the parent perforations. 15-16C will kickoff from 4-1/2" liner drilling a horizontal well to provide offtake in the target fault block across the • Zone 1A sands. Well design involves kicking off a 4-1/2" packer whipstock, drilling build section with 20 DLS landing prior to crossing fault#1, drilling lateral with 12 DLS geosteering above BSAD as needed, run 3-1/2" x 3-1/4" x 2-7/8" L-80 production liner, cemented and perforated. This Sundry covers plugging the existing 15-16B perforations via the packer whipstock and liner cement job or liner • top packer, if the liner lap pressure test fails (alternate plug placement per 20 AAC 25.112(i)). The following describes the work planned and is submitted as an attachment to Form 10-403. A schematic diagram of the current well and proposed sidetrack is attached for reference. Pre-Rig Work(scheduled to begin November 15,2016) 1. C Mill XN Nipple to 3.80", Drift 2. V Pre-CTD tree work. Rig Work(scheduled to begin December 15, 2016) 1. MIRU and test BOPE 250 psi low and 3,500 psi high (MASP 2,532 psi). tNiS 2. Set 4-1/2" Packer Whipstock 3. Mill 3.80"window and 10' of rathole. 4. Drill Build: 4.25" OH, -381' (20 deg DLS planned). ((�� 5. Drill Lateral: 4.25" OH, 2,416' (12 deg DLS planned). 1�.� w►2�-5 Petr 6. Run 3-1/4" x 2-7/8" L-80 liner leaving TOL at-12,600' MD. V-)9-11-L- 7. Pump primary cement job: 33.5 bbls, 15.3 ppg Class G, TOC at-12,600' MD. 8. Perform cleanout run if needed 9. Perform liner lap test*. 10. Perforate -800' 11. Freeze protect well to a min 2,100' TVDss. 12. Close in tree, RDMO. * Approved alternate plug placement per 20 AAC 25.112(i) i/ • • Post-Rig Work: 1. Pull TWC. Tree workas necessary. ecessa . 2. Set liner top packer if liner lap test fails.* 3. Pressure Test LTP (if necessary) 4. ASRC flowback 5. RPM log 6. SIT Jacob Leemhuis CC: Well File CTD Engineer Joe Lastufka 564-4989 6 T e' ,J aces- 1.-/v4 y 6M �" eve-0:5 " �bnc��. f' � f`v��� vVc�� d MFIs� Wke4 Pcd cr� "i - C sr Ace4t 4 -erift. e/ htwe 1464-4 l'rrle ,f coy /ec4srfe. 110 41 tiAtcl Frr fedr'Il riiyiAld 411O 4' :'1roged tr® r (sr 1-44 © f Ti' 19 I1` /(L 1, /��� WI LLFEAD= FMC S 15-16B 5-16B S *NOTES: WELL ANGLE*70°@ ACTUATOR= —A -- C 130 2'. 4 1/2"CHROME TBG* ORIG WELL&15- _B2 C GKB.ELEV= _ -BA-I(71.0' I I 16A NOT SHOWN BELOW WHIPSTOCK*** REF—BLE/_ _61' BF.ELE_V= 36.02 ' 2230' H4-1/2"HES X NB,ID=3.813" KOP — = _.____— —3000' Max Angle= 95°@ 15326' Datum MD= NA Datum ND= — 8800;-§-B- 8800'SS GAS LFT MANDRELS 13-3/8"CSG,72#,L-80,D=12.347" —j 2495' ST MD I °II°) DEV TYPE VLV LATCH FORT DATE 4 3550 3531 18 MAG DOME RK 16 11/02/16 3 6987 5503 61 KBG2 DOME BK 16 11/02/16 Minimum ID = 3.725" (,cia 12216' 2 10590 7004 66 KBG2 DMY BK 0 04/09/10 4-1/2" HES XN NIPPLE 1 12039 7930 35 KBG2 DMY BK 0 04/09/10 J 4441' H 9-518"X 7"ZXP LTP w/TIEBACK SLV,D=6.290" ;. , 4457' H9-5/8"X 7"BKR FLEXLOCK LNR HGR,D=6.180" • 9-5/8"WHESTOCK(03/21/10) H 4587' f''1 /, . MI-LOUT WINDOW(15-16B) 4587'-4604' A. 9-5/8"CSG,47#,L-80 BTC,ID=8.681" H 10850' 12073' H4-1/2"HES X NIP,D=3-813" PERFORATION SIJMMIARY REF LOG: 12108' —1 7"X 4-1/2"HES TNT PKR,D=3.856" ANGLE AT TOP PERF:92°@ 14000' �` Note:Refer to Production DB for historical perf data \► SIZE SPF N ERVAL Opn/Sqz SHOT SQZ j It —i4-t/2"HES X NP,D=3.813" 2.88" 6 13380-13820 S 04/07/10 06/19/14 2.88" 6 14000-14450 0 04/07/10 2.88" 6 14600-14630 C 04/07/10 12216' --14-1/2"HES XN Nom,ID=3-725" 2.88" 6 14670-14750 C 04/07/10 2.88" 6 14850-15020 C 04/07/10 12219' —7"X 5"HRD-E ZXPN LTP w/TIEBACK SLV,ID=4.190" \! 12228' H4-1/2"WLEG,D=3.958" 12235' 7"X 5"BKR FLEXLOCK LNR HGR ID=4-340" 4-1/2"TBG, 12.6#,13CR-85 VAM TOP,.0152 bpf,D=3-958" H 12228' 12245' H 5"X 4-1/2"XO,ID=3.910" ` 14555' —14-1/2"WED CEP(4/27/16) 7"LNR,26#,L-80 VAM TOP HC,.0383 bpf,D=6.276" ---I 12398' 15533' CTMD 1 FISH:WF r aBP MLLE(6/29/14) PBTD —I 15543' '�,k44\, 4-1/2"LNR 12.6#,L-80 BT-M,.0152 bpf,ID=3.958" H 15632' DATE REV BY COMMENTS DATE REV BY COMMENTS PRUDHOE BAY MIT 06/30/84 ORIGINAL COMPLETION 07/25/14 JCF/JMD CMTSCE/FISH(6/19-29/14) WELL: 15-16B . 11/18/90 LAST WORKOVER 05/02/16 SW/JMD SET CEP(04/27/16) FERMI No:'210020 11/20101 CTD SIDETRACK(15-16?) 11/01/16 JMD PRE-RIG CLEANUP API No: 50-029-21115-02-00 12/31/01 CWTP CTD SIDETRACK(15-16A?) 11/07/16 ZV/JM3 GLV GO(11/02/16) SEC22,T11N,R14E,854'FN..&165'FWL 04/01/10 NIBS CTD SIDETRACK(15-16B) 11/10/16 JNL/JM3 ADDED REF&BF ELEVATIONS 04/18/10 TLH DRLG HO CORRECTIONS BP Exploration(Alaska) NNgLHEAD= FIAC PROPOS. 15-16' SATES: WELL ANGLE>70°@ '. ACTUATOR= ***4-1/2"CHROME TBG*** 0KB.ELEV= 71.0' REV 2 1 I BF—ECFV= NA KOP= 3000' I 2230' —I4-1/2"HES X NP,D=3.813" Max Angle= @ ' Datum MD= Datum TVD= 8800'SS GAS LFT MANDRELS 13-3/8"CSG,72#,L-80,13=12.347" H 2495' I ST M3 1 V DEV TYPE VLV LATCH PORT DATE 4 3550 3531 18 !AVG DMY RK 0 06/16/14 I 3 6987 5503 61 KBG2 DMY BK 0 06/16/14 2 10590 7004 66 KBG2 DMY BK 0 04/09/10 Minimum I 1 12039 7930 35 KBG2 DMY BK 0 04/09/10 1 1-1 4441' H9-5/8"X 7"ZXP LW w MEBACK SLV,D=6.290" r L 4457' —I9-5/8"X 7"BKR FLEXLOCK LNR HGR,ID=6.180" 9-5/8"WHIPSTOCK(03/21/10) H 4587 I711 MLLOUT WINDOW(15-16B) 4587'-4604' 9-5/8"CSG,47#,L-80 BTC,ID=8.681" —I , 6 ' 12073' —14-112"HES X NP,D=3.813" 12108' H7"X 4-1/2"HES TNT PKR,13=3.856" PERFORATION SUMMARY111 A 12139' —I4-1/2"I ILS X NP,ID=3.813" REF LOG: ANGLE AT TOP PERF:.__"{a? ' Note:Refer to Production DB for historical perf data ' 12216' —I4-1/2"HES XN NP MLLED TO 3.80"( / /__) SIZE SPF INTERVAL Opn/Sq' SHOT SOZ 7 12219' —7"X 5"HRD-E ZXPN LTP w/TIEBACK SLV,D=4.190" 4-1/2"TBG,12.6#,13CR-85 VAM TOP, H 12228' — 12228' --14-112"WLEG,D=3.958" D .0152 bpf, =3.958" I 12235' —17"X 5"BKR FLEXLOCK LNR HGR D=4.340" 12246' —I5"X 4-1/2"XO,D=3.910" 7'LNR,26#,L-80 VAM TOP HC, —I 12398' I—J .0383 bpf,D=6.276" TOL/TOC H 12600' — (;{;{; H3.70"DEPLOY SLV,D=3.00" III H3-1/2" X NIP,D=2.813" 'ti'"LNR 9.2#,L-80 STC,.0087 bpf,D=2.992" —) 13280' — 13280' --I3-1/2"X 3-3/16"XO,ID=2.876" I 4-1/2"KB PKR WHPSTOCK( _/ / ) H 13300' — 4-1/2'LNR,12.6#,L-80 BT-M, H 13300' V MLLOUT WINDOW(15-16C) 13300'- ' .0152 bpf,D=3.958" 3-3/16"LNR,6.2#,L-80 TCL.0076 bpf,D=2.80" —I 14500' 14500' —I 3-3/16"X 2-7/8"XO,13=2.377" PBTD 2-7/8"LNR,6.4#,L-80 S ..0058 bpf,D=2.441" —I 16100' DATE REV BY COMMENTS DATE REV BY COMMENTS PRUDHOE BAY UNIT 06130/84 ORIGINAL COMPLETION 11/01/16 JMD BUILT PROPOSED WELL: 15-16C , 11/18/90 LAST WORKOVBR 11/01/16 JMD BUILT PROPOSE)REV 1 PERMIT No: 11/20/01 CTD SIDETRACK(15-16?) 11/02/16 JCL UPDATED TOP OF LINER API No: 50-029-21115-0 12/31/01 CH/TP CTD SIDETRACK(15-16A?) SEC 22,TI1N,R14E,854'FNL&165'FWL 04101/10 N7ES CTD SIDETRACK(15-16B) _/_/_ CTD SIDETRACK(15-16C) BP Exploration(Alaska) I ill+ I 1 > ; 1 ! ;I b 1— I' WWII /� Y r . -I— . II w ail ( $ - 4 / .( _ 1 $ 1 z. It:1 ..7. ? I ,. a ;•I. 3 /= G m mrd G / tx m �. " - }rn. 4 I I S S "> a Q S $ 1 S z A-r I S %/ y�� w \ ' I �. I/........ 1. ♦:_AM MOO 00... .'W'� S x i i I ewe I 8 I F,m l «H§; 3 1 1 1 i iI 1 mm 1 Q $�<, 1 �1 I I I re 1 I 2 g Q N L 1 1 . . ii aI II, 1 t6 . I 0 U i I II I O 1 H h 2 1 LL .;A I u u u v. I Z I " I� ,- 1 N I ., 1 8 NE • . X A' 1 Z `? i I ;• S 5... U y U 1 N \ x rl 8 I I— 2 ._ aull laisne SPS _ 1 g i i Eill I % • I I CC I 1 \ $ s' I 1 U I I am W 1 m I J E•- 1 I F> \ piI j. LW s` w 1 = ' u I , m0 1 I L o� f♦rte �Z I o I ;; F••: Fe- w"E �g ( x °u. 1 Y d t 7��i UU z U, 'i O �• o f z u" I = g a .' ( Y \ m Eg I N H f �• I( v x = \ u U i U \ Y illio NI Z r!- I I) �7— s f (i • ® m \ 8 g e u u R n a 1 .1 a e 1— u E r o ll 'I, m r i U f m °'° ( x 1 o. 0 0 R UmcsaU f irvl— i x wI 0 .O ¢ S Z a I K I u 0rc U w I (♦8 E u; K o x to if. N,2b i & I.. I I u *O gm x g$ I a == 1 I.. _ 1 x a 2g • • Sundry Application Plug for Re-drill Wells Work Flow This process is used to identify wells that are suspended for a very short time prior to being re- drilled. Those wells that are not re-drilled immediately are identified every 6 months and assigned a current status of"Suspended." Step Task Responsible 1 The initial reviewer will check to ensure that the "Plug for Redrill" box Geologist / in the upper left corner of Form 10-403 is checked. If the "Abandon" or ,/ "Suspend" boxes are also checked, cross out that erroneous entry and initial it on both copies of the Form 10-403 (AOGCC's and operator's copies). 2 If the "Abandon"box is checked in Box 15 (Well Status after proposed Geologist work) the initial reviewer will cross out that erroneous entry and initial then it on both copies of the Form 10-403 (AOGCC's and operator's copies). Instead, check the "Suspended" box and initial that change. Drilling Engineer The drilling engineers will serve as quality control for steps 1 and 2. (QC) 3 When the Stat Tech receives a Form 10-403 with a check in the "Plug Stat Tech for Redrill"box, they will enter the Typ_Work code "IPBRD" into the History tab for the well in RBDMS. This code automatically generates a comment in the well history that states "Intent: Plug for Redrill." 4 When the Stat Tech receives any Form 10-407, they will check the Stat Tech History tab in RBDMS for the "Intent: Plug for Redrill" code (IPBRD). If present and there is no evidence that a subsequent re-drill has been COMPLETED, the Stat Tech will assign a status of SUSPENDED to the well bore in RBDMS no matter what status is listed on the 10-407. The Stat Tech will also change the status on the 10-407 form to SUSPENDED, and date and initial this change. If the Stat Tech does not see the "Intent: Plug for Redrill" comment or code, they will enter the status listed on the Form 10-407 into RBDMS. 5 When the Form 10-407 for the redrill is received, the Stat Tech will Stat Tech change the original well's status from SUSPENDED to ABANDONED. 6 The first week of every January and July, the Stat Tech and one of the Stat Tech Geologists will check the "Well by Type Work Outstanding"user query Geologist in RBDMS to ensure that all of the Plug for Redrill wells have been handled properly. At this same time, they will also review the list of suspended wells for accuracy. i w .. 0 N Produced Gas (Thousand Cubic Feet ("MCF") per Day) or Gas-Oil Ratio (MCF per Barrel) 0 0 O O 0 0 0 0 0 0 0 0 •p 0 0 0 0 0 0 0 0 0 0 - o - . 01 CO N U3 U11 Cr M N 0 0 �i 1 I/ �i 9l z/ O I iiib, v) ib ro( 0 O =7„ 2ro ililiniiii- 4>. on> = to .— SI%i O 0C7 -- In 1111.""--1111.""-- v� O 0 13 o ! : Z: CO celaillim o 11 ' P O m - ► �l LA 0 I-I 3 N. O —� fir, O N CL ato to cr 11_ 0 0 b. 9y a l > O l o Q O �� I Q, O a d`sl a 0 O w 1, a obrE E v u oru io O Zr0 0 I a of 0 0 0 0 0 0 0 0 0 0 4<i; co0 0 0 0 0 N 00 0 0 0 0 nt N 16 r- rl rl rl rl Aea Jed JaleM}o slaaae8 Jo Aea aad l!O }o slaaae8 u 0 a • STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMMI N REPORT OF SUNDRY WELL OPERATIONS 1. Operations Performed Abandon ❑ Plug Perforations I ! Fracture Stimulate 0 Pull Tubing ❑ Operations shutdown ❑ Suspend 0 Perforate 0 Other Stimulate 0 Alter Casing 0 Change Approved Program 0 Plug for Redrill 0 Perforate New Pool 0 Repair Well 0 Re-enter Susp Well 0 Other: 5C f CJ3p ❑ 2. Operator Name: BP Exploration(Alaska),Inc 4. Well Class Before Work 5. Permit to Drill Number 210-020 3. Address: P.O.Box 196612 Anchorage, Development Q Exploratory 0 AK 99519-6612 Stratigraphic 0 Service ❑ 6. API Number: 50-029-21115-02-00 7. Property Designation(Lease Number): ADL 0028306 8. Well Name and Number: PBU 15-16B 9. Logs(List logs and submit electronic and printed data per 20AAC25.071): 10. Field/Pools: PRUDHOE BAY,PRUDHOE OIL 11.Present Well Condition Summary: RECEIVED ^E l Total Depth: measured 15634 feet Plugs measured 14555 feet ■6/-C true vertical 8641 feet Junk measured 15533 feet MAY 2 5 2016 Effective Depth: measured 14555 feet Packer measured 12107 feet A true vertical 8689 feet Packer true vertical 7985.83 feet '1/�OG r/��c Casing: Length: Size: MD: TVD: Burst: Collapse: Structural Conductor 80 20"91.5#H-40 29-109 29-109 1490 470 Surface 2467 13-3/8"72#L-80 28-2495 28-2495 4930 2670 Intermediate 4562 9-5/8"47#L-80 25-4587 25-4389 6870 4760 Production Liner See Attachment See Attachment See Attachment See Attachment See Attachment See Attachment Perforation Depth: Measured depth: 13380-13820 feet 14000-14450 feet 14600-14630 feet 14670-14750 feet 14850-15020 feet True vertical depth: 8683-8691 feet feet 8695-8692 feet 8687-8685 feet 8683-8680 feet 8674-8666 feet Tubing(size,grade,measured and true vertical depth) 4-1/2"12.6#13Cr80 23-12226 23-8084 Packers and SSSV(type,measured and See Attachment See Attachment See Attachment true vertical depth) 12.Stimulation or cement squeeze summary: Intervals treated(measured): Treatment descriptions including volumes used and final pressure: SCANIOED SEP 2 1 2016 13. Representative Daily Average Production or Injection Data Oil-Bbl Gas-Mcf Water-Bbl Casing Pressure Tubing Pressure Prior to well operation: 545 44395 0 240 1149 Subsequent to operation: 546 25376 0 380 1097 14.Attachments:(required per 20 AAC 25.070.25.071,8 25.283) 15.Well Class after work: Daily Report of Well Operations Q Exploratory 0 Development Q Service 0 Stratigraphic ❑ Copies of Logs and Surveys Run ❑ 16.Well Status after work: Oil Q Gas 0 WDSPL 0 Printed and Electronic Fracture Stimulation Data 0 GSTOR ❑ WINJ 0 WAG 0 GINJ 0 SUSP 0 SPLUG 0 17.I hereby certify that the foregoing is true and correct to the best of my knowledge. Sundry Number or N/A if C.O.Exempt: N/A Contact Catron,Garry R(Wipro) Email Garry.Catron@bp.com Printed Name A CCatron,Garry R(Wiprro) Title PDC Principal Engineer Signature / •4 Phone +1 907 564 4424 Date 5/24/16 Form 10-404 Revised 5/201`4./1 JI4 C70/1!. RBDMS L.L. MAY 3 1 2016 Submit Original Only • • Q.0o0000 CON- vL010 U y o 0 0 o 0 0 i 6) M N. CO CO 7 V C)) CO N "Zr CO CD N- CO CO to O CO N- 00 C) CO N Nr CO M N CD O N V CO CO CO ▪ i 1 1 1 1 1 N- CD CA CO to CO I� CO N N N N O N - CO CD O in CD CD o W O O N Lo N !� N N r r r V 1 1 1 m C)""4. CD C) r O w v M N N N N N LO m 0 02` • 000 co co 0 J J co J r) = N % N J () •N N30 CS) CS) 0p 0O N - U - N - N M o 4 a O CD CD IC) N- C C o0 Nr 10 0) N J N M W Q_ Q C W W ' U U ar2 f c Z Z W W W m O D H Z_ Z_ D U W Z J J I- • • Packers and SSV's Attachment PBU 15-16B SW Name Type MD TVD Depscription 15-16B PACKER 4450.48 4294.97 7" Baker ZXP Top Packer 15-16B TBG PACKER 12106.7 7985.83 4-1/2" HES TNT Perm Packer 15-16B PACKER 12228.07 8084.93 5" Baker ZXP Top Packer • • k // c = c 2 $ / \ o CO co O � \ L- N / -c G § / / \ / k = oma / § / \ \ / o/ § C - (0 o >- 0 \ o — 2 m CU ƒ .§ ± �� $ as / E o / /� -'/ k ± % a a_ GG ° O ® ®RE / m mO Campoc - 5 — 6/ _a (-T, / / / _keo 6of /t / � o M 0 c 2 / 2 o 't CO / m o t / \ E f 0 « E \ 46 5 b 7 / Ce 0 \ 2 d - - EL. k # Iq / \ ƒ \ � . 0 i f \ , $ \ 3 b css - ca - _ * CI \$ \ @ m\ k E _ % G / \ . U = $ / v7\ o / DbUf � 5 � CLm $ ? .C •0oE % \ c -- / E \ / I § q / k / \ k / / / \ k / cR A = _ « NI- ,.,1-- i: ƒ o A 0 2 I Ri 2 L \ e e I- d d / © 5 f \ @n 0 # « TREE= CIV WELLHI'AD= FMC • 15®16 B 13062'.*"NOTES:CFROWELL E TBG**ORIG WELL 815_ `ACTUATOR= BAKER C I I 16A NOT SHOWN BELOW W FNPSTOCK*** OKB.ELEV= 71.0' BF.ELEV= NA KOP= 3000' I I { 2230' —14-112"I ES X MP,D=3.813" Max Angle= 95°@ 15326' Datum MD= NA Datum ND= 880(Y SS 13-3/8"CSG,72#,L-80,D=12.347" I-- 2495' .-A GAS LIFT MANDRELS ST_ MDND DEV TYPE VLV LATCH PORT DATE L 4 3550 -3531 18 MIG OMY RK 0 06/16/14 Minimum ID = 3.725" , 12215' 3 6987 5503 61 KBG2 DMY BK 0 06/16/14 2 10590 7004 66 KBG2 DMY BK 0 04/09/10 4-1/2" HES XN NIPPLE 1 12039 7930 35 KBG2 DMY BK 0 04/09/10 J 4441' H9-518"X 7"2XP LW w fW BACK SLV,I)=6.290" ® • _ 11 ,�' 4457' —{9-5/8"X 7'BKR FLEXLOCK LNR HGR D=6.180" 1 9-5/8"WHPSTOCK(03121110) H 45gT1* 11 10 I Q. MLLOUT WINDOW(15-168) 4587'-4604' 1,, 9-5/8"CSG,47#,L-80,D=8.681" --I 10850' --, 12073' --14-1/2"HES X NP,D 3 = .813" 1 PERFORATION SUMMARY REF LOG: 12108' H7"X 4-1/2"HES TNT PKR,D=3.856" ANGLE AT TOP PERF:920 @ 14000' \j Nate:Refer to Roduction DB for historical pert data SIZE SPF INTERVAL Opn/Sqz SHOT SOZ j ` 12139' --I4-1/2"i-es X NP,D=3.813' 2.88" 6 13380-13820 S 04/07/10 06/19/14 2.88" 6 14000-14450 0 04/07/10 2.88' 6 14600- 14630 C 04/07/10 12216' H4-112"HES XN NIP,D=3.725" 2.88" 6 14670-14750 C 04/07/10 2.88" 6 14850-15020 C 04/07/10 12219` —7"X 5'HRD ZXPN LTP w/TEBACK SLV,D=4.190" \ 12228' —14-1/2"WLEG,D=3.958" k 12235'i—7'x 5"BKR FLEXLOCK LNR HGR D=4.340" 4-1/2"TBG,12.6#,13CR-85 VAM TOP,.0152 bpf,0=3.958" H 12228' 12245' --15"X 4-1/2"XO,D=3.958" ` 14555' H41/2"WFD CBP(4/27/16) 7"LNR,26#,L-80 VAM TOP HC,.0383 bpf,D=6.276" --{ 12398' 111 15533'CTMD —FSH:WFT GBP ,, MLLED(6/29/14) MIDi 15543' '4 4-1/2"LNR, 12.6#,L-80 BT-M,.0152 bpf,D=3.958" H 15632' DATE REV BY COMMENTS DATE REV BY COMMENTS FRJDHOE BAY UM' 06/30/84 ORIGINAL COMPLETION 04/18/10 SEWf1LH GLV CIO(04/14/10) WELL 15-168 11/18/90 LAST WORKOVER 05/11/10 CR/JMD DRLG DRAFT CORRECTIONS PEWIT No: 210020 11/20/01 CTD SIDETRACK(15-16?) 06/17/14 SWC/JM) GLV C/O(06/16/14) AFI No: 50-029-21115-02-00 12/31/01 CH/TP CTD SIDETRACK(15-16A?) 07/25/14 JCF/AID CMT SOZ/FISH(6/19-29/14) SEC 22,T11N,R14E,854'Ftp&165'FWL 04/01/10 MBS CTD SIDETRACK(15-16B) 05/02/16 SW/JM) SET CBP(04/27/16) 04/18/10 TLH DRLG HO CORRECTIONS BP Exploration(Alaska) • • ,ed`- PRINT DISTRIBUTION LIST RI BAKER �� HUGHES i IA NB COMPANY BP Exploration Alaska,Inc. INTERMEDIATE FINAL Yes As.j e sir (mandatory) WELL NAME 15-16B RUN NUMBER 1 (mandatory) 2_\c7. -c 20 FIELD Prudhoe Bay Unit BH SALESMAN Henry Giordanelli 3�Z (mandatory) (mandatory) COUNTY North Slope BH DISTRICT Prudhoe Bay,AK (mandatory) (mandatory) DATA LOGGED STATE Alaska PAGE 1 OF 1 1a/74/2013 M K BENDER (mandatory) LOG DATE: October 21,2013 TODAYS DATE: 10/22/2013 (mandatory) DISTRIBUTION LIST AUTHORIZED BY: Henry Giordanelli (mandatory) HAS CLIENT BEEN INVOICED FOR ADDITIONAL PRINTS? • COMPANY A B C D ADDRESS(FEDEX WILL NOT DELIVER TO P.O.BOX) L.I.S. FILM PERSON ATTENTION #OF PRINTS#OF I*tMN I S#OF COPIES#OF COPIES#OF COPIES#OF COPIES 1 BP Exploration(Alaska),Inc. 2 1 I 1 I 1 900 E Benson Blvd.,LR2-1 A= 15-16B RPM_RAW_21 OCT2013_BHI.META ` IPetrotechnical Data Center B= *(Folder 1 on cd/dvd) 15-16B_RPM RAW_21 OCT2013_BHI.META Attn:David Douglas C= **(Folder 2 on cd/dvd) 15-16B_RPM_RAW 21 OCT2013 BHI.PDF Anchorage,AK 99508 D= ***(Folder 3 on Cd/dvd) 15-16B_RPM_RAW_PASSO1 UP_21 OCT2013_BHI.dlis 15-16B_RPM_RAW_PASSO2UP_21 OCT2013_BHI.dlis ****(Folder 4 on cd/dvd;15-16B_RPM_RAW_PASSO1 UP_21 OCT2013_BHl.las 15-16B_RPM_RAW_PASSO2UP 21OCT2013 BHI.Ias * Folder 1 on cd/dvd needs to be named"META" ** Folder 2 on cd/dvd needs to be named"PDF" *** Folder 3 on cd/dvd needs to be named"DLIS" **** Folder 4 on cd/dvd needs to be named"LAS" NOTE: Files are on META_PDF_DLIS_LAS.zip file on WeIlLink I 2 ConocoPhillips Alaska Inc.Attn: I I I 1 I I J Attn:Ricky Elgaricio ATO 3-344 ( �)(7 y 700GStreet ��c® DEl LV6 Anchorage,AK 99510 S O 6.• 3 ExxonMobil,Alaska 1 I I I 1 I 1 I I Attn:Lynda M.Yaskell and/or Leonardo Elias 3700 Centerpointe Dr.Suite 600 Anchorage,AK 99503 4 State of Alaska-AOGCC 1 I 1 I 1 I 1 I I I Attn:Makana Bender 333 W.7th Ave.Suite 100 Anchorage,Alaska 99501 5 DNB-Division of Oil&Gas I I 1 I 1 I I I Attn:Sean Clifton 550 West 7th Avenue,Suite 802 Anchorage,Alaska 99501 TOTALS FOR THIS PAGE: 4 3 4 5 0 0 TOTALS FOR ALL PAGES: 4 3 4 5 0 0 DATA SUBMITTAL COMPLIANCE REPORT 10/21/2011 Permit to Drill 2100200 Well Name /No. PRUDHOE BAY UNIT 15 -16B Operator BP EXPLORATION (ALASKA) INC API No. 50- 029 - 21115 -02 -00 MD 15634 TVD 8641 Completion Date 4/9/2010 Completion Status 1 -OIL Current Status 1 -OIL UIC N REQUIRED INFORMATION Mud Log No Samples No Directional Surve( Ye� DATA INFORMATION Types Electric or Other Logs Run: DIR / GR / RES, DIR / GR / RES / NEU / DEN (data taken from Logs Portion of Master Well Data Maint Well Log Information: III Log/ Electr Data Digital Dataset Log Log Run Interval OH / Tyre Med /Frmt Number g athe Scale Media No Start Stop CH Received Comments ED C Lis 19856 "Induction /Resistivity 4555 15633 Open 7/8/2010 OH LIS and OH PB1 GR, ROP, FET, RPX, RPS, RPM, RPD, RAM, NPHI, TRPM ogg Induction /Resistivity 25 Blu 4500 15634 Open 7/8/2010 MD Vision Service cfe6g Induction /Resistivity 25 Blu 4500 15634 Open 7/8/2010 TVD Vision Service cJ�bg Induction /Resistivity 25 Blu 4500 13198 Open 7/8/2010 PB1 MD Vision Service .'Cog Induction /Resistivity 25 Blu 4500 13198 Open 7/8/2010 PB1 TVD Vision Service D C Directional Survey 0 15634 Open t Directional Survey 0 15634 Open E C Directional Survey 0 13240 Open PB1 Rpt Directional Survey 0 13240 Open PB1 III Well Cores /Samples Information: Sample Interval Set Name Start Stop Sent Received Number Comments ADDITIONAL INFORMATION (`� Well Cored? Y J � Daily History Received? D Chips Received? Y; N`" Formation Tops 6 / N Analysis Y Received? Comments: DATA SUBMITTAL COMPLIANCE REPORT 10/21/2011 Permit to Drill 2100200 Well Name /No. PRUDHOE BAY UNIT 15 -16B Operator BP EXPLORATION (ALASKA) INC API No. 50- 029 - 21115 -02-00 MD 15634 TVD 8641 Completion Date 4/9/2010 Completion Status 1 -OIL Current Status 1 -OIL UIC N Compliance Reviewed By: Date: 2 " . l • 06/30/10 Sth erger NO. 5553 Alaska Data & Consulting Services Company: State of Alaska 2525 Gambell Street, Suite 400 Alaska Oil & Gas Cons Comm Anchorage, AK 99503 -2838 Attn: Christine Mahnken ATTN: Beth 333 West 7th Ave, Suite 100 Anchorage, AK 99501 Well Job # Log Description Date BL Color CD J -13 B14B -00109 USIT / 2'0 3 - ^ r 06/23/10 1 1 K -06B BCUE -00027 MEM PROD PROFILE t.-- ,,,-, l 06/14/10 1 1 — PWDW3 -1 _ BCRC-00027 RST WFL `'` 4 /1104; Ai '9 06/22/10 1 1 _ 1- 11/SN -04 0 ® 148 -00107 LDL i ,,qq 06/12/10 1 1 3- 01/N -29 0088 -00021 MEM INJ. PROFIL E � / v j #5 Vi 06/13/10 1 1 15-1613 10AKA0047 OH MWD/LWD EDIT "'J ill 15- 16BPB1 10AKA0047 OH MWD /LWD EDIT V' ' iJCYt! Y 1 1.56.4, _ 04/01/10 2 1 03 -22 BSJN -00047 RST , ,3 — i 93 i q z- ti' 03/30/10 1 1 G -30C AZ2F -00038 MCNL .04:1 — ' � j VT 04/22/10 1 1 PLEASE ACKNOWLEDGE RECEIPT BY SIGNING AND RETURNING ONE COPY EACH TO: BP Exploration (Alaska) Inc. Alaska Data & Consulting Services Petrotechnical Data Center LR2 -1 2525 Gambell Street, Suite 400 0 • 900 E. Benson Blvd. Anchorage, AK 99503 -2535 Md� rns., t 4 e ■ f' s ,'-11�� jh‘. CS \'—"---- q UNDER EVALUTAION: Producer 15 16 (PTD #2100200) Sustained Casing P sure on the OA Page 1 of 1 Regg, James B (DOA) From: AK, D &C Well Integrity Coordinator [AKDCWellIntegrityCoordinator @bp.com] * Sent: Friday, June 04, 2010 6:14 PM N 11 To: Maunder, Thomas E (DOA); Schwartz, Guy L (DOA); Regg, James B (DOA); AK, OPS FS3 OSM; AK, OPS FS3 Facility OTL; AK, OPS FS3 DS Ops Lead; AK, OPS FS3 Operator; AK, OPS FS3 DS Operators; AK, D &C Well Services Operations Team Lead; AK, D &C Wireline Operations Team Lead; Cismoski, Doug A; Engel, Harry R; Lee, Timothy Cc: AK, D &C Well Integrity Coordinator; Janowski, Carrie; Quy, Tiffany; Wellman, Taylor T; Winslow, Jack L (ASRC); Holt, Ryan P (ASRC) Subject: UNDER EVALUTAION: Producer 15 -16 (PTD #2100200) Sustained Casing Pressure on the OA Follow Up Flag: Follow up Flag Status: Blue Attachments: Producer 1>*6IPTD #2100200) TIO Plot.doc; Producer 15 -16 (PTD #2100200) schematic.pdf All, Producer 15. -1.6• (PTD# 2100200) has confirmed sustained OA casing pressure over MOASP. The wellhead pressures were tubing /IA/OA equal to 1111/1580/1100 on 6/2/2010. The pressure on the OA has been bled down and is being monitored for repressurization. The well has been reclassified as Under Evaluation. The well may remain online while work is conducted to attempt to restore integrity. Plan forward: 1. DHD to perform an OART 2. Evaluate the for wellhead for IC hangar packoff work A TIO plot and wellbore schematic are included for reference. «Producer 15 -16 (PTD #2100200) TIO Plot.doc» «Producer 15 -16 (PTD #2100200) schematic.pdf» Please call if you have questions or concerns. Thank you, Gtr —> t3 `' Leo, '72p Gerald Murphy (alt. Torin Roschinger) '5 - Well Integrity Coordinator Office (907) 659 -5102 P i loOps; Cell (907) 752 -0755 Pager (907) 659 -5100 Ext. 1154 % AU a= 2(J it ( pti 8/20/2010 ■ 0 PBU 15-16B PTD 2100200 6/4/2010 TIO Pressures Plot Well: 15-1 6 4,000 - • 3,000 011N11.0 4 Z000 - 11 .....-----.--.., 000 b :on g A0 A 1,000 I -• - 11 1111 IIIMIII • . Ifila...001111 , 03/13/10 03/27/10 04/10/10 04/24/10 05/08/10 05/22/10 TREE= CIW LWEIAHEilD = FMC ® S 113062'.A"4 - 1/2" CHROME BG"* ORIGWELL& 15- ACTUATOR= BAKER KB. ELEV = _, 71.0' 1 - - I I 16A NOT SHOWN BELOW WHIPSTOCK* ** BF. ELEV = NA KOP= 3000' ' ( 2230' H4 -112" HES X NIP, ID = 3.813" I Max Angle = 95° © 15326' Datum MD = NA TV Datum D = 8800' SS 1 13 -3/8" CSG, 72 #, L -80, ID = 12.347" H 2495' GAS LIFT MANDRELS ST MD TVD DEV TYPE VLV LATCH PORT DATE 4 RK 16 04/14/10 „ ' LI 3 698 5503 61 KBG2 SO BK 20 04/14/10 Minimum ID = 3.725 @ 12215 2 10590 7004 66 KBG2 DMY BK 0 04/09/10 4 -1/2" HES XN NIPPLE 1 12039 7930 35 KBG2 DMY BK 0 04/09/10 J 4441' H9-5/8" X 7" ZXP LTP w /TIEBACK SLV, ID = 6.290" I t. I 4457' H9-5/8" X 7" BKR FLEXLOCK LNR HGR. ID = 6.180" I • 19 -5/8" WHIPSTOCK (03 /21/10) H 4587' I � A MILLOUT WINDOW (15 -16B) 4587' - 4604' 19 -5/8" CSG, 47 #, L -80, ID = 8.681" H 10850' 12073' H4-1/2" HES X NIP, ID = 3.813" I PERFORATION SUMMARY 12108' H7" X 4 -1/2" HES TNT PKR, ID = 3.856" I REF LOG: ANGLE AT TOP PERF: 85° @ 13380' N, k., Note: Refer to Production DB for historical perf data \ j Ilk 12139' H4-1/2" HES X NIP, ID = 3.813" SIZE SPF INTERVAL Opn /Sqz DATE 2.88" 6 13380 - 13820 0 04/07/10 2.88" 6 14000 - 14450 0 04/07/10 12216' I-14-1/2" HES XN NIP. ID = 3.725" I 2.88" 6 14600 - 14630 0 04/07/10 2,88" 6 14670 - 14750 0 04/07/10 12219' I— j 7" X 5" HRD ZXPN LTP w /TIEBACK 2.88" 6 14850 - 15020 0 04/07/10 SLV, ID = 4.190" \ 12228' H4 -1/2" WLEG. ID = 3.958" I '0. % 12235' I- 7" x 5" BKR FLEXLOCK LNR HGR 1 ID = 4.340" 14-1/2" TBG, 12.6 #, 13CR -85 VAM TOP, .0152 bpf, ID = 3.958" I-I 12228' 12245' I-1 Y X 4 -1/2" XO, ID = 3.958" I 17" LNR, 26 #, L -80 VAM TOP HC, .0383 bpf ,ID = 6.276" H 12398' l k I PBTD H 15543' I ' �R ; ,+ 4 -1/2" LNR, 12.6 #, L -80 IBT -M, .0152 bpf, ID = 3.958" I — ) 15632' DATE REV BY COMMENTS DATE REV BY COMMENTS PRUDHOE BAY UNIT 06/30/84 ORIGINAL COMPLETION 04/18/10 SEW/TLH GLV C/O (04/14/10) WELL: 15 -16B 11/18/90 LAST WORKOVER 05/11/10 CR/JMD DRLG DRAFT CORRECTIONS PERMIT No: 210020 11/20/01 CTD SIDETRACK (15 -16 ?) API No: 50- 029 - 21115 -02 -00 12/31/01 CH/TP CTD SIDETRACK (15 -16A ?) SEC 22, T11 N, R14E, 854' FNL & 165' FWL 04/01/10 N7ES CTD SIDETRACK (15 -16B) 04/18/10 TLH DRLG HO CORRECTIONS BP Exploration (Alaska) RECEIN4D STATE OF ALASKA • Al OIL AND GAS CONSERVATION COMMISSION Y 6 Well COMPL . TSQN OR RECOMPLETION REPORT AND LOG 1a. Well Status: A ON $, • �ii PLUG ❑ Other ❑ Abandoned ❑ Suspended lb. Well Class: VOlDtgle 2OAAC 25.105 20AAC 25.110 ® Development ❑ Exploratory ❑ GINJ ❑ WINJ U WAG ❑ WDSPL ❑ Other No. of Completions One ❑ Service ❑ Stratigraphic 2. Operator Name: 5. Date Comp., Susp., or Aband.: 12. Permit to Drill Number: BP Exploration (Alaska) Inc. 4/9/2010 210 - 020 3. Address: 6. Date Spudded: 13. API Number: P.O. Box 196612, Anchorage, Alaska 99519 -6612 3/22/2010 50 - 029 - 21115 - - 4a. Location of Well (Governmental Section): 7. Date T.D. Reached: 14. Well Name and Number: +1$1 ( e' /6 f) Surface: 4/4/2010 15 -16B 854' FNL, 165' FWL, SEC. 22, T11 N, R14E, UM 8. KB (ft above MSL): _52.3' 15. Field / Pool(s): Top of Productive Horizon: 224' FSL, 4882' FWL, SEC. 10, T11 N, R14E, UM GL (ft above MSL): 32.8' Prudhoe Bay Field / Prudhoe Bay Total Depth: 9. Plug Back Depth (MD +TVD): Oil Pool 1669' FSL, 3104' FWL, SEC. 10, T11 N, R14E, UM 15543' 8642' 4b. Location of Well (State Base Plane Coordinates, NAD 27): 10. Total Depth (MD +TVD): 16. Property Designation: Surface: x- 676088 y - 5960631 Zone- ASP4 15634' 8641' ADL 028306 & 028307 TPI: x- 680641 y- 5967098 Zone- ASP4 11. SSSV Depth (MD +TVD): 17. Land Use Permit: Total Depth: x- 678827 y- 5968500 Zone- ASP4 None 18. Directional Survey: ®Yes ❑ No 19. Water depth, if offshore: 20. Thickness of Permafrost (TVD): (Submit electronic and printed information per 20 AAC 25.050) N/A ft MSL 1900' (Approx.) 21. Logs Obtained (List all logs here and submit electronic and printed information per 20 AAC 25.071): 22. Reeill/Lateral Top Window MD/TVD: DIR / GR / RES, DIR / GR / RES / NEU / DEN, 4587' 4389' 23. CASING, LINER AND CEMENTING RECORD SETTING DEPTH MD SETTING DEPTH TVD HOLE AMOUNT CASING WT. PER FT. GRADE TOP BOTTOM TOP BOTTOM SIZE CEMENTING RECORD PULLED 20" 91.5# H - 40 Surface 80' Surface 80' 30" 1910 # Poleset 13 -3/8" 72# L -80 Surface 2495' Surface 2495' 17 -1/2" 1900 sx Permafrost 'E'. 400 sx PF 'C' 9-5/8" 47# L -80 Surface 4587' Surface 4389' 12-1/4" 500 sx Class 'G'. 300 sx PF 'C' 7" 26# L -80 4441' 12398' 4288' 8225' 8 -1/2" 174 sx Class 'G' 4-1/2" 12.6# L -80 12219' 15632' 8078' 8641' 6-1/8" 413 sx Class 'G' 24. Open to production or injection? ® Yes ❑ No 25. TUBING RECORD If Yes, list each interval open SIZE DEPTH SET (MD) PACKER SET (MD / ND) (MD +TVD of Top & Bottom; Perforation Size and Number): 2.88" Gun Diameter, 6 spf 4 -1/2 ", 12.6#, 13Cr85 12228' 12108' / 7987' MD ND MD ND 13380' - 13820' 8683' - 8691' 26. ACID, FRACTURE, CEMENT SQUEEZE, ETC. 14000' - 14450' 8695' - 8692' 14600' - 14630' 8687' - 8685' DEPTH INTERVAL (MD) AMOUNT AND KIND OF MATERIAL USED 14670' - 14750' 8683' - 8680' 14 850 50 0 ' - 1 2 ' 8674' - 66' Freeze Protected w/ 152 Bbls of Diesel 86 27. PRODUCTION TEST Date First Production: Method of Operation (Flowing, Gas Lift, etc.): April 17, 2010 Flowing Date of Test: Hours Tested: Production For OIL -BBL: GAS -MCF: WATER -BBL: CHOKE SIZE: GAS -OIL RATIO: 5/5/2010 8 Test Period ♦ 791 6,521 -0- 63 8,248 Flow Tubing Casing Press: Calculated OIL-BBL: GAS -MCF: WATER -BBL: OIL GRAVITY -API (CORR): Press. 1,111 620 24 -Hour Rate ♦ 2,372 19,562 -0- Not Available 28. CORE DATA Conventional Core(s) Acquired? ❑ Yes 0 No Sidewall Core(s) Acquired? ❑ Yes 0 No If Yes to either question, list formations and intervals cored (MD +TVD of top and bottom of each), and summarize lithology and presence of oil, gas or water (submit separate sheets with this form, if needed). Submit detailed descriptions, core chips, photographs and laboratory analytical results • #;'' .f 71. None .I --; _ Form 10-407 Revised 12/2018Dms MAY 07 s I NUED ON REVERSE - D 3 _� p Submit Original Only 29. GEOLOGIC MARKERS (List all formati•nd markers encountered): 30. • FORMATION TESTS NAME MD ND Well Tested? ❑ Yes 0 No Permafrost Top If yes, list intervals and formations tested, briefly summarizing test Permafrost Base results. Attach separate sheets to this form, if needed, and submit detailed test information per 20 AAC 25.071. Ugnu 4 4982' 4615' None West Sak 2 8050' 5957' Colville Mudstone 3 9053' 6369' Top HRZ 11893' 7810' Base HRZ 12152' 8023' LCU 12218' 8077' Sag River 12396' 8223' Shublik A 12452' 8269' Shublik B 12478' 8290' Shublik C 12496' 8304' Sadlerochit 12523' 8324' Base CGL / Top Zone 2C 12686' 8441' 22TS 12797' 8510' 21 TS / Zone 2A 12895' 8559' Zone 1B 13067' 8627' TDF / Zone 1A 13267' 8667' Formation at Total Depth (Name): TDF / Zone 1A 13267' 8667' 31. List of Attachments: Summary of Daily Drilling Reports, Well Schematic Diagram, Surveys 32. I hereby certify that the foregoing is true and correct to the best of my knowledge. D S/ • � Signed: Terrie Hubble • Title: Drilling Technologist Date: 15 - 16B 210 - 020 Prepared By Name Number: Terrie Hubble, 564 -4628 Well Number Permit No. / Approval No. Drilling Engineer: Charles Reynolds, 564-5480 INSTRUCTIONS General: This form is designed for submitting a complete and correct well completion report and log on all types of lands and leases in Alaska. Submit a well schematic diagram with each 10-407 well completion report and 10-404 well sundry report when the downhole well design is changed. Item la: Classification of Service Wells: Gas Injection, Water Injection, Water - Alternating -Gas Injection, Salt Water Disposal, Water Supply for Injection, Observation, or Other. Multiple completion is defined as a well producing from more than one pool with production from each pool completely segregated. Each segregated pool is a completion. Item 4b: TPI (Top of Producing Interval). Item 8: The Kelly Bushing and Ground Level elevation in feet above mean sea level. Use same as reference for depth measurements given in other spaces on this form and in any attachments. Item 13: The API number reported to AOGCC must be 14 digits (ex: 50 -029- 20123- 00 -00). Item 20: Report true vertical thickness of permafrost in Box 20. Provide MD and ND for the top and base of permafrost in Box 28. Item 23: Attached supplemental records for this well should show the details of any multiple stage cementing and the location of the cementing tool. Item 24: If this well is completed for separate production from more than one interval (multiple completion), so state in item 1, and in item 23 show the producing intervals for only the interval reported in item 26. (Submit a separate form for each additional interval to be separately produced, showing the data pertinent to such interval). Item 27: Method of Operation: Flowing, Gas Lift, Rod Pump, Hydraulic Pump, Submersible, Water Injection, Gas Injection, Shut -In, or Other (explain). Item 28: Provide a listing of intervals cored and the corresponding formations, and a brief description in this box. Submit detailed description and analytical laboratory information required by 20 MC 25.071. Item 30: Provide a listing of intervals tested and the corresponding formation, and a brief summary in this box. Submit detailed test and analytical laboratory information required by 20 MC 25.071. Form 10-407 Revised 1212009 Submit Original Only BP EXPLORATION Page 1 of 1 Leak -Off Test Summary Legal Name: 15 -16 Common Name: 15 -16 Test Date Test Type Test Depth (TMD) Test Depth (TVD) AMW Surface Pressure Leak Off Pressure (BHP) EMW 3/21/2010 LOT 4,595.0 (ft) 4,393.0 (ft) 8.90 (ppg) 600 (psi) 2,631 (psi) 11.53 (ppg) 3/31/2010 LOT 12,398.0 (ft) 8,226.0 (ft) 8.40 (ppg) 665 (psi) 4,255 (psi) 9.96 (ppg) • ill Printed: 4/22/2010 4:15 28 PM . S BP EXPLORATION Page 1 of 1 Operations Summary Report Legal Well Name: 15 -16 Common Well Name: 15 -16 Spud Date: 11/19/2001 Event Name: MOBILIZATION Start: 3/17/2010 End: 3/18/2010 Contractor Name: NABORS ALASKA DRILLING I Rig Release: 5/10/2010 Rig Name: NABORS 7ES Rig Number: Date From - To Hours Task Code NPT Phase Description of Operations 3/18/2010 00:00 - 12:00 12.00 MOB P PRE INSTALL BRIDLE LINES AND PREPARE TO LD DERRICK. LD DERRICK. MOVE SUBSTRUCTURE FROM DS 17 TO DS 15. SPOT CAMP, PITS AND SHOP ON DS 15 12:00 - 22:00 10.00 RIGU P PRE SPOT RIG OVER 15 -16. RAISE DERRICK. MOVE IN PITS. PREP FLOOR AND RD BRIDLE LINES. RU TOP DRIVE AND RU INTERCONNECT. CHANGE OUT SAVER SUB TO 4 -1/2" IF. INSTALL AUXILLARY ANNULUR VALVES. TAKE ON 105 DEG SEAWATER. ACCEPT RIG AT 22:00 HRS ON 3/18/2010 22:00 - 23:00 1.00 WHSUR P DECOMP TEST TREE. PRESSURE TEST LINES TO 2000 PSI. PT OA TO 2000 PSI FOR 10 MIN. PRESSURE TEST IA AND BPV TO 1000 PSI FOR 10 MIN. 23:00 - 00:00 1.00 WHSUR P DECOMP RU DSM LUBRICATOR. PRESSURE TEST LUBRICATOR TO 500 PSI. PULL BPV AND RD LUBRICATOR. Printed: 4/22/2010 4:14:52 PM ! S BP EXPLORATION Page 1 of 14 Operations Summary Report Legal Well Name: 15 -16 Common Well Name: 15 -16 Spud Date: 11/19/2001 Event Name: RE ENTER Start: 3/19/2010 End: 4/5/2010 Contractor Name: NABORS ALASKA DRILLING I Rig Release: 5/10/2010 Rig Name: NABORS 7ES Rig Number: Date From - To Hours Task Code NPT Phase Description of Operations 3/19/2010 00:00 - 00:30 0.50 WHSUR P DECOMP RU ON OPEN TOP TANK TO CIRCULATE OUT FREEZE PROTECT. 00:30 - 03:00 2.50 WHSUR P DECOMP PJSM, PRESSURE TEST LINES TO 1000 PSI AND REVERSE CIRCULATE 25 BBLS OF DIESEL OUT THE TUBING. BD AND SWAP LINES. CIRCULATE 132 BBLS OF DIESEL OUT THE IA AND CBU 1X - 252 GPM, 715 PSI RIG DOWN AND BLOW DOWN LINES 03:00 - 04:00 1.00 WHSUR P DECOMP INSTALL ISA BPV AND TEST FROM BELOW TO 1000 PSI FOR 10 MIN. RD AND BLOW DOWN TEST EQUIPMENT. 04:00 - 06:00 2.00 WHSUR P DECOMP PJSM, ND TREE AND ADAPTOR. INSTALL BLANKING PLUG. 06:00 - 08:30 2.50 BOPSUF P DECOMP PJSM, NU BOPE 08:30 - 09:30 1.00 BOPSUF P DECOMP RU LINES TO TEST BOPE 09:30 - 14:30 5.00 BOPSUF P DECOMP TEST BOPE AND CHOKE MANIFOLD TO 250 PSI LOW/ 3500 PSI HIGH WITH 3 -1/2" AND 5" TEST JOINT. TEST ANNULUR TO 250 PSI/ 2500 PSI HIGH WITH 3 -1/2" AND 5" (5 TEST JOINT. AOGCC REP JEFF JONES WAIVED WITNESSED TO TEST. TEST ALSO WITNESSED BY NAD TOOLPUSHER CHRIS WEAVER AND BP WSL DAVE NEWLON. 14:30 - 15:30 1.00 BOPSUF P DECOMP RD TEST EQUIPMENT AND BLOW DOWN LINES 15:30 - 18:00 2.50 WHSUR P DECOMP MU LUBRICATOR EXTENSION AND LUBRICATOR. TEST TO 500 PSI. ATTEMPT TO PULL BPV. UNABLE TO LATCH ON TO BPV. 18:00 - 20:00 2.00 WHSUR N SFAL DECOMP RD LUBRICATOR AND LUBRICATOR EXTENSION SUCK OUT STACK. AND CHECK FOR DEBRI ON PLUG. RU LUBRICATOR EXTENSION. LUBRICATOR EXTENSION MAKING UP OFF CENTER. INSTALL LARGER CENTRALIZER ON PULLING TOOL. RU LUBRICATOR AND LUBRICATOR EXTENSION. PULL BPV. 20:00 - 21:00 1.00 PULL P DECOMP RU 4 -1/2" SPEAR AND STING INTO TUBING. BACKOUT LDS. PULL TUBING HANGER TO RIG FLOOR. TUBING PULLED FREE AT 70K PUW. 21:00 - 22:30 1.50 PULL P DECOMP PUMP 35 BBLS SAFE SURF -0 SWEEP. CIRCULATE SWEEP SURFACE TO SURFACE. RU TUBING HANDLING EQUIPMENT. RU CAMCO SPOOLER. 22:30 - 23:00 0.50 PULL P DECOMP RD SPEAR AND LD. BACK OFF HANGER AND LD HANGER. 23:00 - 00:00 1.00 PULL P DECOMP PULL 1 JT OF 4 -1/2" TUBING AND LD 3 -1/2" TUBING FROM 5,000' TO 4,800'. REMOVE CLAMPS AND SPOOL CONTROL LINE. - 66K PUW 3/20/2010 00:00 - 06:30 6.50 PULL P DECOMP CONTINUE TO PULL 3 -1/2" TUBING FROM 4.800 WITH CONTROL LINE. RECOVERED 156 JTS OF 3 -1/2" TUBING ONE 4.5" JOINT. 1 SSSV, 2 GLM, 8 SS BANDS, 159 CLAMPS AND PINS, AND 21.1' CUT JOINT. 06:30 - 08:00 1.50 PULL P DECOMP RD CONTROL LINE SPOOLER AND TUBING HANDLING EQUIPMENT. CLEAN AND CLEAR RIG FLOOR. 08:00 - 10:00 2.00 BOPSUF P DECOMP RU AND TEST LOWER PIPE RAMS TO 250 PSI LOW/ 3500 Printed: 4/22/2010 4:15:35 PM • BP EXPLORATION Page 2 of 14 Operations Summary Report Legal Well Name: 15 -16 Common Well Name: 15 -16 Spud Date: 11/19/2001 Event Name: RE ENTER Start: 3/19/2010 End: 4/5/2010 Contractor Name: NABORS ALASKA DRILLING I Rig Release: 5/10/2010 Rig Name: NABORS 7ES Rig Number: Date From - To Hours Task Code NPT Phase Description of Operations 3/20/2010 08:00 - 10:00 2.00 BOPSUF P DECOMP PSI HIGH FOR 5 MIN WITH 4" AND 5" TEST JOINTS. TEST WITNESSED BY NAD TOOLPUSHER CHRIS WEAVER AND BP WSL DAVE NEWLON. 10:00 - 10:30 0.50 CLEAN P DECOMP LOAD PIPE SHED WITH 5" DRILL PIPE. BRING SCRAPER, BIT AND BHA TOOL TO RIG FLOOR. 10:30 - 13:00 2.50 CLEAN P DECOMP PU 8.5" BIT, CASING SCRAPER, 8.5" STRING MILL AND FLOAT SUB. RIH TO 769' MD. 13:00 - 16:00 3.00 CLEAN P DECOMP PU DRILL PIPE FROM 769' TO 4980' MD. WASH DOWN AND TAG TUBING STUB AT 4996'. - 130K PUW, 120K SOW 16:00 - 17:00 1.00 CLEAN P DECOMP CBU 1.5X - 550 GPM, 1345 PSI MONITOR WELL, STATIC 17:00 - 18:30 1.50 CLEAN P DECOMP PUMP DRY JOB AND POOH FROM 4996' TO 320' MD 18:30 - 19:00 0.50 CLEAN P DECOMP RACK BACK DRILL COLLARS AND LD CASING SCRAPER, STRING MILL AND 8.5" BIT. CLEAN AND CLEAR RIG FLOOR 19:00 - 20:30 1.50 DHB P DECOMP PJSM, RU E -LINE EQUIPMENT. PU EZSV AND RUNNING TOOL. 20:30 - 23:30 3.00 DHB P DECOMP RIH WITH EZSV, CCL AND GR. LOG UP AND TIE IN LOG. SET TOP OF EZSV AT 4615' MD, P OOH WITH RUNNING TOOL AND LOGGING TOOLS. 23:30 - 00:00 0.50 DHB P DECOMP PRESSURE TEST CASING TO 3500 PSI FOR 30 MIN. LOST 21 PSI IN THE FIRST 15 MIN AND 7 PSI IN THE SECOND 15 MIN. 3/21/2010 00:00 - 02:30 2.50 WHSUR P DECOMP BACK OUT LDS. PULL WEAR RING AND PACKOFF. INSTALL NEW PACKOFF. RUN IN LDS. TEST TO 5000 PSI FOR 30 MIN. INSTALL WEAR RING. 02:30 - 05:00 2.50 STWHIP P WEXIT PJSM. PU WHIPSTOCK. MILLING ASSEMBI Y AND PQWERPUI SE TOOL. CONFIRM SHEAR PINS AND INSTALL SHEAR BOLT. RIH TO 830' MD. 05:00 - 08:00 3.00 STWHIP P WEXIT RIH FROM 830' TO 1396' MD. SHALLOW HOLE TEST MWD AT 450 GPM AND 660 PSI. CONTINUE TO RIH TO 4510' MD, ORIENT WHIPSTOCK 50 DEGREES RIGHT. RIH AND TAG EZSV AT 4609' Mn SO 20K AND SHEAR ANCHOR. PULL 10K OVER TO CONFIRM SET. SO 50K TO SHEAR BOLT. TOW = 4,587' MD BOW = 4604' MD 125K PUW, 120K SOW 08:00 - 08:30 0.50 STWHIP P WEXIT PUMP 50 BBL HIGH VISCOSITY SPACER AND DISPLACE WELL TO 9.0 PPG LSND MILLING FLUID. - 520 GPM, 650 PSI 08:30 - 10:00 1.50 STWHIP N RREP WEXIT TOP DRIVE LUBE OIL FILTER FAILED. CHANGE OUT FILTER AND BYPASS LUBE COOLER. 10:00 - 16:00 6.00 STWHIP P WEXIT MILL WINDOW FROM 4587' TO 4591' MD. UTILIZE SUPER SWEEPS AS NESSESARY. - 3 -5K WOB - 350 GPM, 600 PSI - 6 -9K TQ ON, 3K TO OFF - 90 RPM - 125K PUW, 120K SOW, 123K RTW Printed: 4/22/2010 4:15:35 PM S BP EXPLORATION Page 3 of 14 Operations Summary Report Legal Well Name: 15 -16 Common Well Name: 15 -16 Spud Date: 11/19/2001 Event Name: RE ENTER Start: 3/19/2010 End: 4/5/2010 Contractor Name: NABORS ALASKA DRILLING I Rig Release: 5/10/2010 Rig Name: NABORS 7ES Rig Number: Date From - To Hours Task Code NPT Phase Description of Operations 3/21/2010 10:00 - 16:00 6.00 STWHIP P WEXIT DRILL 29' OF NEW FORMATION TO 4620' MD. RECOVERED 318 LBS OF METAL 16:00 - 17:00 1.00 STWHIP P WEXIT CBU 1.5X WHILE RECIPRICATING PIPE. WORK THROUGH WINDOW WITH AND WITHOUT ROTATING AND PUMPS - 350 GPM, 590 PSI 17:00 - 17:30 0.50 STWHIP P WEXIT POOH FROM 4620' TO 4582' MD. BLOW DOWN TOP DRIVE AND REMOVE BLOWER HOSE. 17:30 - 18:00 0.50 STWHIP P WEXIT PRESSURE UP TO 600 PSI TO PERFORM LOT TEST AT , 4595' MD, 4393' TVD, 9.0 PPG MW IN AND OUT. BREAK OVER AT 11.6 PPG FMW 18:00 - 20:00 2.00 STWHIP P WEXIT MONITOR WELL, STATIC. POOH FROM 4582' TO 360' MD. 20:00 - 21:00 1.00 STWHIP P WEXIT PJSM, LD 9 DRILL COLLARS AND MILLING BHA. BOTH UPPER MILLS IN GAUGE. CLEAN AND CLEAR RIG FLOOR. 21:00 - 22:30 1.50 WHIP P WEXIT PULL WEAR RING, FUNCTION RAMS, JET STACK AND BLOW DOWN LINES. INSTALL WEAR RING 22:30 - 00:00 1.50 DRILL P WEXIT PJSM, PU BHA #4: DTX619M -D6, XP 1.83 BEND MOTOR, ARC AND POWERPULSE TOOL TO 181' MD. 3/22/2010 00:00 - 01:00 1.00 STWHIP P WEXIT CONTINUE TO PU BHA #4 TO 726' MD 01:00 - 05:00 4.00 STWHIP P WEXIT PU 5" DRILL PIPE FROM 726' TO 4467'. SHALLOW HOLE TEST AT 1012' MD. 05:00 - 08:30 3.50 STWHIP P WEXIT CHANGE OUT DRILLING LINE, SLIP NEW SPOOL OF DRILLING LINE. INSPECT DRAWWORKS, BRAKES. SERVICE CROWN AND TOP DRIVE. RECALIBRATE MWD BLOCK HEIGHT. 08:30 - 09:00 0.50 STWHIP P WEXIT ORIENT 50R AND ESTABLISH CLEAN HOLE ECD'S. RIH TO 4620' MD - 125K PWU, 117K SOW 09:00 - 12:00 3.00 DRILL P INT1 DRILL AHEAD FROM 4620' TO 4907' MD - 10K WOB - 550 GPM, 1420 PSI ON, 1385 PSI OFF - 60 RPM, 4.5K TQ ON, 3K TQ OFF - 130K PUW, 110K SOW, 120K RTW - 9.73 PPG CALC. ECD, 10.06 PPG ACTUAL - AST = 1.46, ART = .69, ADT = 2.15 12:00 - 22:00 10.00 DRILL P INT1 DRILL AHEAD FROM 4907' TO 6295' MD - 10K WOB - 550 GPM, 1680 PSI ON, 1560 PSI OFF - 60 RPM, 7K TQ ON, 5.5K TQ OFF - 150K PUW, 115K SOW, 125K RTW - 9.89 PPG CALC. ECD, 10.2 PPG ACTUAL - AST = 1.63, ART = 4.68, ADT = 6.31 9.0 PPG MW IN AND OUT 22:00 - 23:00 1.00 DRILL P INT1 CBU 2X WHILE ROTATING 60 RPM - 550 PSI, 1550 PSI ECD'S DROP TO 10.06 PPG, SHAKERS CLEANED UP AND TORQUE DROPPED OFF TO 5K SHUT DOWN AND MONITOR WELL, STATIC 23:00 - 00:00 1.00 DRILL P INT1 POOH ON ELEVATORS FROM 6295' MD TO 5634'. WIPE TIGHT SPOTS AT 6006', 5925 -5905' MD. ROTATE AND PUMP THROUGH TIGHT SPOT AT 5858' MD. - 415 GPM, 1040 PSI - 50 RPM, 6K TQ 3/23/2010 00:00 - 04:00 4.00 DRILL P INT1 POH FROM 5,634' TO 4,651' MD. Printed: 4/22/2010 4:15:35 PM S BP EXPLORATION Page 4 of 14 Operations Summary Report Legal Well Name: 15 -16 Common Well Name: 15 -16 Spud Date: 11/19/2001 Event Name: RE ENTER Start: 3/19/2010 End: 4/5/2010 Contractor Name: NABORS ALASKA DRILLING I Rig Release: 5/10/2010 Rig Name: NABORS 7ES Rig Number: Date From - To Hours Task Code NPT Phase Description of Operations 3/23/2010 00:00 - 04:00 4.00 DRILL P INT1 - WIPE TIGHT SPOT AT 5,168'. - MAD PASS FROM 4,651' MD TO 4,451' MD AT 300 FPH. - SHUT DOWN AND MONITOR WELL; WELL STATIC. - PUMP DRYJOB AND POOH FROM 4,451' TO 726'. 04:00 - 06:00 2.00 DRILL P INT1 RACK BACK 6 STANDS OF HWDP AND 1 STAND OF COLLARS. LD BHA #4. - BIT GRADE: 1, 2, WT, A, X, I, CT, BHA. 06:00 - 07:00 1.00 DRILL P INT1 REPLACE EPOCH MONITOR WITH CANRIG MONITOR IN DRILLING CONSOLE. 07:00 - 09:00 2.00 DRILL P INT1 SERVICE RIG. - SERVICE TOP DRIVE. - INSPECT DRAWWORKS. - ADJUST BLOCK HEIGHT SENSOR FOR MWD. 09:00 - 11:00 2.00 DRILL P INT1 PU BHA # 5, WHICH CONSISTS OF: - 8 -1/2" HYCALOG DTX619M -E1, POWERDRIVE RSS, PD RECEIVER AND FLEX, ARC6, MWD, NM STAB, NM COLLARS, FLOAT /SAVER SUB, 5" HWDP, HYDRAULIC JARS, XO, 4" HWDP, 4" DP, GHOST REAMER AT 1,641', 4" DP, AND 2ND GHOST REAMER AT 4,372'. - FUNCTION TEST POWERDRIVE RSS; TEST GOOD. - PU BHA #5 TO 724'. 11:00 - 14:00 3.00 DRILL P INT1 PU BHA #5 FROM 724' TO 4,403'. - SHALLOW HOLE TEST MWD TOOLS AT 450 GPM, 840 PSI; TEST GOOD. - PU 4" DP SINGLES FROM THE PIPESHED TO RIH. 14:00 - 16:30 2.50 DRILL P INT1 RIH ON 5" DP STANDS FROM THE DERRICK FROM 4,403' TO 6,295'. - TOOK 50K WT AT DEPTHS OF 5,678', 5,843', 5,938', 6,106', AND 6,197'. - WORKED THROUGH AREAS WITHOUT ISSUE. - WASHED LAST 2 STANDS TO BOTTOM; 2' OF FILL ON BOTTOM. - PU WT 125K, SO WT 95K. 16:30 - 00:00 7.50 DRILL P INT1 DRILL AHEAD IN 8 -1/2" INTERMEDIATE INTERVAL FROM 6,295' TO 6,658' MD. - 10K WOB. - 550 GPM, 1,940 PSI ON, 1,935 PSI OFF. - 140 RPM, 6K TO ON, 5K TQ OFF. - 137K PU WT, 105K SO WT, 115K ROT WT. - 9.76 PPG CALC. ECD, 9.92 PPG ACTUAL ECD. - ART 4.77, ADT 4.77. - 9.0 PPG MW IN AND OUT. 3/24/2010 00:00 - 12:00 12.00 DRILL P INT1 DRILL AHEAD IN 8 -1/2" INTERMEDIATE INTERVAL FROM 6,658' TO 7,708' MD. - 20K WOB. - 550 GPM, 2,165 PSI ON, 2,145 PSI OFF. - 140 RPM, 7 -9K TQ ON, 6K TQ OFF. - 153K PU WT, 115K SO WT, 125K ROT WT. - 9.69 PPG CALC. ECD, 10.13 PPG ACTUAL ECD. - ART 8.99, ADT 8.99. - 9.0 PPG MW IN AND OUT. 12:00 - 00:00 12.00 DRILL P INT1 DRILL AHEAD IN 8 -1/2" INTERMEDIATE INTERVAL FROM 7,708' TO 8,557' MD. Printed: 4/22/2010 4:15:35 PM S BP EXPLORATION Page 5 of 14 Operations Summary Report Legal Well Name: 15 -16 Common Well Name: 15 -16 Spud Date: 11/19/2001 Event Name: RE ENTER Start: 3/19/2010 End: 4/5/2010 Contractor Name: NABORS ALASKA DRILLING I Rig Release: 5/10/2010 Rig Name: NABORS 7ES Rig Number: Date From - To Hours Task Code NPT Phase Description of Operations 3/24/2010 12:00 - 00:00 12.00 DRILL P INT1 - 20K WOB. - 550 GPM, 2,240 PSI ON, 2,230 PSI OFF. - 140 RPM, 8K TQ ON, 7K TQ OFF. - 168K PU WT, 122K SO WT, 135K ROT WT. - 9.94 PPG CALC. ECD, 10.04 PPG ACTUAL ECD. - ART 10.19, ADT 10.19. - 9.0 PPG MW IN AND OUT. 3/25/2010 00:00 - 12:00 12.00 DRILL P INT1 DRILL AHEAD IN 8 -1/2" INTERMEDIATE INTERVAL FROM 8,557' TO 9,501' MD. - 20 -25K WOB. - 550 GPM, 2,375 PSI ON, 2,365 PSI OFF. - 150 RPM, 9-11K TQ ON, 8K TQ OFF. - 185K PU WT, 127K SO WT, 145K ROT WT. - CALC. ECD 9.77 PPG, ACTUAL ECD 10.26 PPG. - ART 9.66, ADT 9.66. - 9.2+ PPG MW IN AND OUT. 12:00 - 00:00 12.00 DRILL P INT1 DRILL AHEAD IN 8 -1/2" INTERMEDIATE INTERVAL FROM 9,501' TO 10,410' MD. - 20 -25K WOB. - 550 GPM, 2,560 PSI ON, 2,515 PSI OFF. - 150 RPM, 10 -12K TQ ON, 9.5K TO OFF. - 197K PU WT, 130K SO WT, 148K ROT WT. - CALC. ECD 9.93 PPG, ACTUAL ECD 10.52 PPG. - ART 10.41, ADT 10.41. - 9.3 PPG MW IN AND OUT. 3/26/2010 00:00 - 12:00 12.00 DRILL P INT1 DRILL AHEAD IN 8 -1/2" INTERMEDIATE INTERVAL FROM 10,410' TO 11,243' MD. - 20 -25K WOB. - 550 GPM, 2,705 PSI ON, 2,740 PSI OFF. - 150 RPM, 12K TQ ON, 11K TQ OFF. - 220K PU WT, 135K SO WT, 158K ROT WT. - CALC. ECD 10.14 PPG, ACTUAL ECD 10.52 PPG. - ART 10.04, ADT 10.04. - 9.4+ PPG MW IN AND OUT. 12:00 - 00:00 12.00 DRILL P INT1 DRILL AHEAD IN 8 -1/2" INTERMEDIATE INTERVAL FROM 11,243' TO 11,952' MD. - 20 -25K WOB. - 550 GPM, 3,070 PSI ON, 3,029 PSI OFF. - 150 RPM, 12.5K TQ ON, 11K TQ OFF. - 224K PU WT, 145K SO WT, 165K ROT WT. - CALC. ECD 11.47 PPG, ACTUAL ECD 11.60 PPG. - ART 10.55, ADT 10.55. - 10.5 PPG MW IN AND OUT. 3/27/2010 00:00 - 08:00 8.00 DRILL P INT1 DRII I AHFGD_IN_8- 112LENTFRMFDIATE INTERVAL FROM 11,952' TO GEO- DETERMINED INTERMEDIATE INTERVAL TD AT 12,400' MD. - 20 -25K WOB. - 550 GPM, 3,164 PSI ON, 3,124 PSI OFF. - 145 RPM, 14K TO ON, 12.5K TQ OFF. - 245K PU WT, 150K SO WT, 170K ROT WT. - CALC. ECD 11.4 PPG, ACTUAL ECD 11.57 PPG. - ART 7, ADT 7. - 10.5 PPG MW IN AND OUT. Printed: 4/22/2010 4:15:35 PM BP EXPLORATION Page 6 of 14 Operations Summary Report Legal Well Name: 15 -16 Common Well Name: 15 -16 Spud Date: 11/19/2001 Event Name: RE ENTER Start: 3/19/2010 End: 4/5/2010 Contractor Name: NABORS ALASKA DRILLING I Rig Release: 5/10/2010 Rig Name: NABORS 7ES Rig Number: Date From - To Hours Task Code NPT Phase Description of Operations 3/27/2010 00:00 - 08:00 8.00 DRILL P INT1 - GEO CAUGHT SAMPLES AND CONFIRMED PRESENCE OF GLOCONITIC SANDS. 08:00 - 10:30 2.50 DRILL P INT1 CBU X 3. - 550 GPM, 3,164 PSI. - SHAKERS CLEANED UP AFTER 2ND BU. 10:30 - 11:30 1.00 DRILL P INT1 PUMP OUT OF HOLE FROM 12,400' TO ABOVE THE THRZ AT 11,860'. - 2 BPM, 350 PSI. - MONITOR WELL FOR 5 MINUTES; WELL STATIC. - 10.5 PPG MW IN AND OUT. 11:30 - 12:00 0.50 DRILL P INT1 POH ON ELEVATORS. - INTERMITTENT SWABBING FROM 11,750' TO 11,672'. - RIH 20' AND TRY TO ESTABLISH CIRCULATION; UNSUCCESSFUL. 12:00 - 12:30 0.50 DRILL P INT1 RIH FROM 11,755' TO 11,860'. - RE- ESTABLISH CIRCULATION, STAGING PUMPS UP SLOWLY. - 550 GPM, 3,160 PSI. - 40 RPM. - 10.5K TQ. 12:30 - 13:30 1.00 DRILL P INT1 CBU. - 550 GPM, 3,160 PSI. - 40 RPM. - 10-11K TQ. - HOLE UNLOADED UPON BU. 13:30 - 15:30 2.00 DRILL P INT1 BACKREAMED FROM 11,860' TO 10,720' (# 1 GHOST REAMER DEPTH). - 485 GPM, 2,800 PSI. - 60 RPM. - 10K TQ. 15:30 - 17:00 1.50 DRILL P INT1 RIH FROM 10,720' TO 12,322'. - ESTABLISH CIRCULATION WITH BOTH PUMPS, STAGING UP SLOWLY. - WASH TO BOTTOM AT 12,400'. - NO FILL; NO PROBLEMS. 17:00 - 20:00 3.00 DRILL P INT1 CBU. - 550 GPM, 3,175 PSI. - LOST MP # 2 DUE TO SWAB AND LINER. - PUMPED WITH MP # 1 AT 300 GPM, 1,200 PSI. - 120 RPM. - 12.5K TQ. - ONCE MP # 2 REPAIRED, WENT BACK TO PUMPING WITH BOTH PUMPS AND CBU. 20:00 - 20:30 0.50 DRILL N DFAL INT1 EXPERIENCE POSSIBLE DP WASH -OUT. - LOST 1,000 PSI. - SURFACE TESTED MUD LINES AND EQUIPMENT; NO LEAKS NOTED. - CLEANED SUCTION SCREENS ON PUMPS; SCREENS RELATIVELY CLEAN. - PUMPED TO TEST MWD DOWNHOLE TOOLS; TURBINE SHOWED 1,000 RPM LOSS. - MONITORED WELL; WELL STATIC. - 10.5 PPG MW IN AND OUT. Printed: 4/22/2010 4:15:35 PM • ! S BP EXPLORATION Page 7 of 14 Operations Summary Report Legal Well Name: 15 -16 Common Well Name: 15 -16 Spud Date: 11/19/2001 Event Name: RE ENTER Start: 3/19/2010 End: 4/5/2010 Contractor Name: NABORS ALASKA DRILLING I Rig Release: 5/10/2010 Rig Name: NABORS 7ES Rig Number: Date From - To Hours Task Code NPT Phase Description of Operations 3/27/2010 20:00 - 20:30 0.50 DRILL N DFAL INT1 - PU WT 250K, SO WT 143K, ROT WT 172K. 20:30 - 00:00 3.50 DRILL P INT1 POH ON ELEVATORS FROM 12,400' TO 10,162'. - EXPERIENCED INTERMITTENT SWABBING AND 25K OVERPULL FROM 11,574' TO 10,200'. 3/28/2010 00:00 - 01:30 1.50 DRILL P INT1 POH ON 5" DP FROM 10,162' TO 8,500'. - LD AND REPLACE WASHED -OUT 5" DP JOINT (BOTTOM JT OF STAND 83; WASHED OUT 3' DOWN FROM TOOL JT, WHERE SLIPS ARE SET). - PUMP AT 550 GPM, 2,600 PSI TO ENSURE THIS JT WAS THE ONLY BAD JT IN THE STRING. - PUMP DRY JOB. 01:30 - 04:30 3.00 DRILL P INT1 POH ON 5" DP FROM 8,500' TO INSIDE OF 9 -5/8" WINDOW AT 4,400'. - PU WT 165K, SO WT 120K. 04:30 - 05:00 0.50 DRILL P INT1 CBU AT THE 9 -5/8" WINDOW. - 545 GPM, 2,376 PSI. - 82 RPM. - HOLE UNLOADED ON BU, BUT SHAKERS CLEANED UP AFTER A SHORT INTERVAL. 05:00 - 05:30 0.50 DRILL P INT1 SLIP AND CUT 126' OF DRILLING LINE. 05:30 - 07:30 2.00 DRILL P INT1 POH ON 4" DP FROM 4,400' TO 724'. 07:30 - 09:00 1.50 DRILL P INT1 LD BHA # 5. - BIT GRADE: 1, 4, WT, S, X, I, RO, TD; NO PLUGGED NOZZLES AND SEVERAL BROKEN CUTTERS ON OUTER GAUGE ROW AND TAPER. 09:00 - 09:30 0.50 DRILL P INT1 CLEAN AND CLEAR RIG FLOOR. 09:30 - 11:30 2.00 BOPSUF P LNR1 CHANGE UPPER PIPE RAMS TO 7" RAMS. - RU TEST EQUIPMENT. - TEST TO 250 PSI LOW, 3,500 PSI HIGH: TEST GOOD. - RD TEST EQUIPMENT. 11:30 - 15:00 3.50 CASE P LNR1 RU TO RIH WITH 7" LINER. - RU LINER HANDLING EQUIPMENT, FRANKS FILL -UP TOOL, AND 350 -TON AIR SLIPS. 15:00 - 23:30 8.50 CASE P LNR1 PJSM AND RIH WITH 7 ", 26 #, L -80, VAM -TOP HC LINER TO 4,579'. - MU SHOE TRACT AND BAKER -LOK FIRST 4 JTS. - CHECK FLOATS; CHECKED GOOD. - TORQUE TURNED; OPTIMUM MAKE -UP TQ 11,950 FT -LBS. - 1 STRAIGHT -BLADE CENTRALIZER ON THE FIRST 25 JTS, TO INCLUDE THE SHOE TRACT. - FILL PIPE ON THE FLY. - PU WT 125K, SO WT 125K. 23:30 - 00:00 0.50 CASE P LNR1 CIRCULATE 1 AND A HALF LINER VOLUMES AT THE 9 -5/8" WINDOW. - 216 GPM, 475 PSI, APPROX. 4,500 STKS. - NO SIGNIFICANT CUTTINGS NOTED. - 10.5 PPG MW IN AND OUT. 3/29/2010 00:00 - 00:30 0.50 CASE P LNR1 CONTINUE CIRCULATE 1 1/2X LINER VOLUMES AT THE 9 -5/8" WINDOW. - 216 GPM, 475 PSI, APPROX. 4,500 STKS. - PU WT 125K, SOW 115K. - 10.5 PPG MW IN AND OUT. Printed: 4/22/2010 4:15:35 PM BP EXPLORATION Page 8 of 14 Operations Summary Report Legal Well Name: 15 -16 Common Well Name: 15 -16 Spud Date: 11/19/2001 Event Name: RE ENTER Start: 3/19/2010 End: 4/5/2010 Contractor Name: NABORS ALASKA DRILLING I Rig Release: 5/10/2010 Rig Name: NABORS 7ES Rig Number: Date From - To Hours Task Code NPT Phase Description of Operations 3/29/2010 00:30 - 06:00 5.50 CASE P LNR1 CONTINUE RIH WITH 7 ", 26 #, L -80, VAM -TOP HC LINER TO 7,957'. - TORQUE TURNED; OPTIMUM MAKE -UP TQ 11,950 FT -LBS. - FILL PIPE ON THE FLY. - PU WT 185K, SO WT 120K - REDUCED RETURNS STARTING AT 7100' MD, - SLOWED DOWN RUNNING SPEED WITHOUT IMPROVEMENT IN RETURNS -LOST RATE 15 BBLS FOR THE LAST 10 JOINTS 06:00 - 07:30 1.50 CASE P LNR1 RD 7" LINER RUNNING TOOLS TO CONTINUE RIH WITH 7" LINER FROM 7,957' ON 5" DP. - CIRCULATE 1 OPEN -HOLE VOLUME AT 168 GPM, 675 PSI. -LOST 20 BBLS TO FORMATION 07:30 - 08:00 0.50 CASE P LNR1 MU /RIH TO 7,976' WITH 9 -5/8" X 7" BAKER "HRD" ZXPN LINER TOP PACKER AND FLEX -LOCK LINER HANGER. - MIX PALMIX AND LET SET UP FOR 30 MINUTES. 08:00 - 12:30 4.50 CASE P LNR1 RIH WITH 7" LINER ON 5" DP FROM 7,976' TO 11,805'. - FILL LINER EVERY 10 STANDS. - PU WT 260K, SO WT 115K. - REDUCED RUNNING SPEED -LOST RATE 20 BBL / HR 12:30 - 13:00 0.50 CASE P LNR1 BREAK CIRCULATION ABOVE THE HRZ. - PUMPED 115 BBLS AT 3 BPM, 500 PSI. - PARTIAL RETURNS -LOST 75 BBL OVER CIRCULATION 13:00 - 14:30 1.50 CASE P LNR1 RIH WITH 7" LINER ON 5" DP FROM 11,805' TO 12,400'. - BLOW DOWN TOP DRIVE AND RU BAKER CEMENT HEAD AND CEMENT HOSE. - TAG BOTTOM AND PU 2' TO SET SHOE AT 12,398'. - TOP OF 7" LINER AT 4,441'. NO ISSUES RUNNING IN HOLE EXCEPT FOR THE REDUCTION IN RETURNS 14:30 - 17:00 2.50 CEMT P LNR1 BREAK CIRCULATION. - STAGE UP PUMPS AND WAS ABLE TO ESTABLISH CIRCULATION WITH MINIMAL LOSSES. - CIRCULATED AT 1 BPM, 550 PSI AND 1.5 BPM, 555 PSI WITH NO ISSUES. - STAGED UP TO 2.5 BPM AND SAW PARTIAL PACK -OFF TO 830 PSI; STABILIZED THEREAFTER AT 2.5 BPM, 670 PSI. - CONTINUED STAGING UP PUMPS TO 3 BPM, 692 PSI AND 4 BPM, 750 PSI BEFORE ROLLING BACK PUMPS TO 2 BPM, 500 PSI IN PREPARATION FOR START OF THE 7" LINER CEMENT JOB. -NO LOSS AT 2 BPM / 60 BPH AT 4 BPM 17:00 - 19:00 2.00 CEMT P LNR1 PJSM FOR 7" INTERMEDIATE LINER CEMENT JOB. - PUMPED 25.2 BBLS OF 11.5 PPG MUDPUSH II STARTING AT 1653 HRS. - PT LINES TO 4,500 PSI; TESTED GOOD. - PUMPED 36 BBLS OF 15.8 PPG CLASS G CEMENT STARTING AT 1708 HRS; PUMPED © 4 BPM, WITH FINAL Printed: 4/22/2010 4:15:35 PM i S • BP EXPLORATION Page 9 of 14 Operations Summary Report Legal Well Name: 15 -16 Common Well Name: 15 -16 Spud Date: 11/19/2001 Event Name: RE ENTER Start: 3/19/2010 End: 4/5/2010 Contractor Name: NABORS ALASKA DRILLING I Rig Release: 5/10/2010 Rig Name: NABORS 7ES Rig Number: Date From - To Hours Task Code NPT Phase Description of Operations 3/29/2010 17:00 - 19:00 2.00 CEMT P LNR1 CIRCULATING PRESSURE AT 229 PSI. /, - DROPPED DRILL PIPE WIPER DART (POSITIVE INDICATION WHEN LEAVING CEMENT HEAD). C ' - PUMPED 5.34 BBLS FRESH WATER TO RINSE l• CEMENTER LINES AND BEGIN DISPLACEMENT. - SWITCHED TO RIG PUMPS FOR THE REST OF THE DISPLACEMENT. - LATCH UP WITH LINER WIPER PLUG AT 1,187 STROKES AND SAW A 500 TO 900 PSI SPIKE. - DISPLACED WITH 370 BBLS AT 4 BPM, 500 -995 PSI UNTIL 5 BBLS BEFORE BUMPING THE PLUG. SLOWED THE PUMP TO 2 BPM IN PREPARATION FOR BUMPING PLUG. BUMPED PLUG AT 6,341 STKS, 375 BBLS AND PRESSURED UP TO 3,000 PSI TO SET HANGER. - SET DOWN 50K TO VERIFY HANGER SET. - BLED OFF PRESSURE AND CHECKED FLOATS; FLOATS HELD. - PRESSURED UP TO 4,200 PSI TO RELEASE THE LINER RUNNING TOOL. - PICKED UP TO EXPOSE DOGS. - SET DOWN 60K AND HAD VERY GOOD SURFACE INDICATION OF DOG SHEAR AT 30K. - PRESSURED UP TO 1,000 PSI TO STING OUT OF THE LINER TOP PACKER. - HAD FULL RETURNS OF 21% IN FLOW LINE FOR FIRST 3,150 STKS OF DISPLACEMENT; RETURNS STEADILY DECREASED TO 7% BY BUMPING OF THE PLUG AT 6,341 STKS. - TOTAL CEMENT PUMPED: TAIL SLURRY, 15.8 PPG -- 36 - BBLS, 175 SKS, 1.16 CU FT /SK. ** *CEMENT IN PLACE AT 1900 HRS. * ** 19:00 - 19:30 0.50 CEMT P LNR1 CBU. - 500 GPM, 587 PSI. 19:30 - 00:00 4.50 CEMT P LNR1 POH WITH LINER RUNNING TOOL ON 5" DP FROM 4,441' TO 679'. - RACK BACK 6 STANDS OF 5" DP IN DERRICK. - LD REMAINDER OF 5" DP TO PIPESHED. 3/30/2010 00:00 - 01:00 1.00 CEMT P LNR1 LD 5" DP AND LINER RUNNING TOOL FROM 679' TO SURFACE. TATTLE TALE ON DOG SUB INDICATES GOOD LINER SET. 01:00 - 02:00 1.00 CASE P LNR1 PRESSURE TEST 7" LINER. - 3,500 PSI FOR 30 MINUTES: TEST GOOD. *ROCK SOLID* 02:00 - 03:00 1.00 BOPSUF P LNR1 C/O 7" RAMS TO 2 -7/8" X 5" VBRS. 03:00 - 07:00 4.00 BOPSUF P LNR1 TEST BOPE AND CHC)KF MANIFOI n TO 250 PSI LOW AND 3,500 PSI HIGH FOR 5 MIN WITH 2 -7/8" AND 5" TEST Imo' JOINTS. TEST ANNULAR TO 250 PSI LOW AND 2,500 PSI HIGH WITH 2 -7/8" TEST JOINT FOR 5 MIN. - AOGCC REP CHUCK SCHIEVE WAIVED WITNESS OF THE TEST. TEST WITNESSED BY NAD TOURPUSHER LENWARD TOUSSANT AND BP WSL RAYMOND PLATT. 07:00 - 08:00 1.00 BOPSUF P LNR1 RD TEST EQUIPMENT AND BLOW DOWN LINES. 08:00 - 10:00 2.00 DRILL P LNR1 PU /MU BHA # 6 TO 229'. - PJSM WITH ALL HANDS. Printed: 4/22/2010 4:15:35 PM • • BP EXPLORATION Page 10 of 14 Operations Summary Report Legal Well Name: 15 -16 Common Well Name: 15 -16 Spud Date: 11/19/2001 Event Name: RE ENTER Start: 3/19/2010 End: 4/5/2010 Contractor Name: NABORS ALASKA DRILLING I Rig Release: 5/10/2010 Rig Name: NABORS 7ES Rig Number: Date From - To Hours Task Code NPT Phase Description of Operations 3/30/2010 08:00 - 10:00 2.00 DRILL P LNR1 - BHA # 6 CONSISTS OF 6 -1/8" SMITH XR2OD TRI -CONE BIT WITH 3 X 12 JETS, 1.50 DEGREE BEND MUD MOTOR, NM STABILIZER, NM FLEX LEAD DRILL COLLAR, IMPULSE MWD, ADN4 RADIOACTIVE SOURCE, 3 NM FLEX DRILL COLLARS, BALL CATCHER, CCV CIRCULATION VALVE, AND HYDRAULIC JAR. 10:00 - 15:00 5.00 DRILL P LNR1 RIH FROM 229' TO 6,100' WITH BHA #,6 PICKING UP 4" DP SINGLES FROM THE PIPESHED. 15:00 - 17:00 2.00 DRILL P LNR1 RIH FROM 6,100' TO 7,938' WITH BHA # 6 ON 4" DP STANDS FROM THE DERRICK. 17:00 - 00:00 7.00 DRILL N SFAL LNR1 WHILE PERFORMING A STRIPPING DRILL, WE FILLED THE GAS BUSTER. MATERIAL RELEASES OF APPROX. 5 GALLONS OF DRILLING MUD RESULTED WHEN THE GAS BUSTER LINE TO THE POSSUM BELLY BACKED UP AND OUT OF A VENT LINE OVER TWO OCCASIONS AND OUT OF THE STACK OF THE GAS BUSTER ITSELF IN THE FIRST OF THE TWO OCCASIONS. ON EACH OCCASION, THERE WERE PARTIAL RETURNS TO THE POSSUM BELLY. THE FLUID PACK -OFF WAS CAUSED BY A SEDIMENT PLUG IN THE GAS BUSTER LINE GOING TO THE POSSUM BELLY. THE LINE WAS DISASSEMBLED AND THOROUGHLY CLEANED OUT WITH THE USE OF VARIOUS MUD RAKES/TOOLS AND HIGH - PRESSURE WATER HOSES. 3/31/2010 00:00 - 01:30 1.50 DRILL N SFAL LNR1 CONTINUE WITH THOROUGHLY CLEANING OUT AND REASSEMBLE LOW- PRESSURE GAS BUSTER LINE. 01:30 - 03:30 2.00 DRILL P LNR1 RIH WITH BHA # 6 FROM 7,936' TO 12,244'. 03:30 - 04:00 0.50 DRILL P LNR1 WASHDOWN FROM 12,244' TO 12,312'. - TAG UP ON DP WIPER DART AND LINER WIPER PLUG AT 12,312'. - 235 GPM, 2,250 PSI. 04:00 - 05:00 1.00 DRILL P LNR1 DRILL OUT SHOE TRACT FROM 12,312' TO 12,393' (5' ABOVE 7" SHOE). - TAG PLUGS AT 12,312' AND DRILL THROUGH PLUGS AND LANDING COLLAR. - 230 GPM, 2,190 PSI. - 50 RPM, 9K TQ. - WOB 10K. - PU WT 200K, SO WT 110K, ROT WT 140K. - MW 10.5 PPG IN AND OUT. 05:00 - 07:00 2.00 DRILL P LNR1 DISPLACE WELL FROM 10.5 PPG LSND TO 8.4 PPG FLO -PRO. - 100 BBL WATER SPACER. - 50 BBL EP STEEL LUBE SWEEP TO HELP CONTROL TORQUE IN 7" LINER. - 560 BBLS 8.4 PPG FLO -PRO. - 242 GPM, 2,250 PSI. 07:00 - 07:30 0.50 DRILL P LNR1 DRILL OUT REMAINDER OF SHOE TRACT AND 20' OF NEW FORMATION FROM 12,393' TO 12,420'. - 250 GPM, 1,960 PSI. - RPM 60. - WOB 10K. 07:30 - 08:30 1.00 DRILL P LNR1 RU AND PERFORM FIT TO 10 PPG EMW. Printed: 4/22/2010 4:15:35 PM • • S BP EXPLORATION Page 11 of 14 Operations Summary Report Legal Well Name: 15 -16 Common Well Name: 15 -16 Spud Date: 11/19/2001 Event Name: RE ENTER Start: 3/19/2010 End: 4/5/2010 Contractor Name: NABORS ALASKA DRILLING I Rig Release: 5/10/2010 Rig Name: NABORS 7ES Rig Number: Date From - To Hours Task Code NPT Phase Description of Operations 3/31/2010 07:30 - 08:30 1.00 DRILL P LNR1 - SURFACE PRESSURE 665 PSI. - CHART FOR 10 MINUTES. - RD AND BLOW DOWN TESTING MANIFOLD AND LINES. - MW 8.4 PPG IN AND OUT. 08:30 - 12:00 3.50 DRILL P PROD1 DRILL AHEAD IN 6 -1/8" PRODUCTION INTERVAL PILOT HOLE FROM 12,420' TO 12,553' MD. - 10K WOB. - 250 GPM, 1,901 PSI ON, 1,740 PSI OFF. - 60 RPM, 5K TQ ON, 3K TQ OFF. - 180K PU WT, 140K SO WT, 150K ROT WT. - 8.65 PPG CALC. ECD, 8.9 PPG ACTUAL ECD. - AST 1.33, ART 1.49, ADT 2.82. - 8.4 PPG MW IN AND OUT. 12:00 - 00:00 12.00 DRILL P PROD1 DRILL AHEAD IN 6 -1/8" PRODUCTION INTERVAL PILOT HOLE FROM 12,553' TO 13,119' MD. - 10K WOB. - 250 GPM, 2,136 PSI ON, 1,855 PSI OFF. - 80 RPM, 5.5K TQ ON, 5K TQ OFF. - 192K PU WT, 153K SO WT, 150K ROT WT. - 8.7 PPG CALC. ECD, 9.0 PPG ACTUAL ECD. - AST 4.46, ART 2.16, ADT 6.62. - 8.4 PPG MW IN AND OUT. 4/1/2010 00:00 - 03:30 3.50 DRILL P PROD1 DRILL AHEAD IN 6 -1/8" PRODUCTION INTERVAL PILOT HOLE FROM 13,119' TO 13,240' MD. - 15K WOB. - 250 GPM, 2,016 PSI ON, 1,901 PSI OFF. - 80 RPM, 6K TO ON, 5K TQ OFF. - 195K PU WT, 125K SO WT, 155K ROT WT. - AST 1.01, ART 1.67, ADT 2.68. - 8.5 PPG MW IN AND OUT. 03:30 - 06:00 2.50 DRILL P PROD1 BACKREAMING AND MAD PASSING FROM 13,240' TO 13,000'. - MAD PASS AT 150' /HR. - 250 GPM, 1,780 PSI. - RPM 60. - ROT WT 155K. 06:00 - 07:00 1.00 DRILL P PROD1 BACKREAMING FROM 13,000' TO 12,398'. - 250 GPM, 1,750 PSI. - RPM 60. - ROT WT 150K. CONSULTED WITH DD AND TOWN ENGINEER REGARDING BIT TRIP. - DECISION MADE TO BIT TRIP FOR PDC BIT FOR OPEN -HOLE SIDETRACK AND PRODUCTION INTERVAL. 07:00 - 12:00 5.00 DRILL P PROD1 POH WITH BHA # 6 FROM 12,398' TO 1,452'. - MONITORED WELL; WELL STATIC. - PUMPED DRY JOB. - 8.5 PPG MW IN AND OUT. 12:00 - 13:00 1.00 DRILL P PROD1 POH WITH BHA # 6 FROM 1,452' TO 229'. 13:00 - 14:00 1.00 DRILL P PROD1 LD BHA # 6 FROM 229'. - PJSM ON LD BHA AND HANDLING RADIOACTIVE SOURCES. Printed: 4/22/2010 4:15'35 PM BP EXPLORATION Page 12 of 14 Operations Summary Report Legal Well Name: 15 -16 Common Well Name: 15 -16 Spud Date: 11/19/2001 Event Name: RE ENTER Start: 3/19/2010 End: 4/5/2010 Contractor Name: NABORS ALASKA DRILLING I Rig Release: 5/10/2010 Rig Name: NABORS 7ES Rig Number: Date From - To Hours Task Code NPT Phase Description of Operations 4/1/2010 13:00 - 14:00 1.00 DRILL P PROD1 - CLEAN AND CLEAR RIG FLOOR, SERVICE TOP DRIVE, AND DOWNLOAD MWD TOOL. - BIT GRADE: 3- 2- BT- M- E -I -ER -BHA. 14:00 - 15:30 1.50 DRILL P PROD1 PU BHA #7 TO 235'. - BHA # 7 CONSISTS OF 6 -1/8" HYCALOG MSR513D -B1C PDC BIT WITH 2X10 AND 3X11 JETS, 1.50 DEGREE BEND AIM AD MUD MOTOR, NM STABILIZER, NM FLEX LEAD DRILL COLLAR, IMPULSE MWD, ADN4 RADIOACTIVE SOURCE, 3 NM FLEX DRILL COLLARS, BALL CATCHER, CCV CIRCULATION VALVE, AND HYDRAULIC JAR. 15:30 - 00:00 8.50 DRILL P PROD1 RIH WITH BHA # 7 FROM 235' TO 11,582'. SHALLOW TEST MWD AT 1175', 260 GPM, 830 PSI. - IN ADDITION TO RIH WITH 4" DP STANDS FROM THE P1� V DERRICK, PU 60 JTS OF 4" DP FROM THE PIPESHED. ` OD 4/2/2010 00:00 - 01:00 1.00 DRILL P PROD1 RIH WITH BHA # 7 FROM 11,582' TO 12,398'. �' 01:00 - 01:30 0.50 DRILL P PROD1 SLIP AND CUT 86' OF DRILLING LINE. - SERVICE TOP DRIVE. f " 01:30 - 02:00 0.50 DRILL P PROD1 RIH WITH BHA # 7 FROM 12,398' TO 12,940'. - PU WT 185K, SO WT 125K. 02:00 - 08:00 6.00 DRILL P PROD1 OPEN -HOLE SIDETRACK FROM 12,940' TO 12,955'. - LINE UP LOW SIDE AND TRENCH FROM 12,920' TO 12,940'. - TIME DRILL 3' /HR UNTIL SIDETRACKED. - GPM 250, 1,683 PSI. - PU WT 185K, SO WT 125K. - 8.5 PPG MW IN AND OUT. 08:00 - 12:00 4.00 DRILL P PROD1 DRILL AHEAD IN 6 -1/8" PRODUCTION LATERAL FROM 12,955' TO 13,170' MD. - 15K WOB. - 250 GPM, 1,885 PSI ON, 1,678 PSI OFF. - 80 RPM, 6K TQ ON, 4K TQ OFF. - 190K PU WT, 135K SO WT, 150K ROT WT. - AST 5.89, ART .23, ADT 6.12. - 8.5 PPG MW IN AND OUT. 12:00 - 00:00 12.00 DRILL P PROD1 DRILL AHEAD IN 6 -1/8" PRODUCTION LATERAL FROM 13,170' TO 13,710' MD. - 15K WOB. - 250 GPM, 1,830 PSI ON, 1,690 PSI OFF. - 80 RPM, 7K TQ ON, 6K TQ OFF. - 190K PU WT, 130K SO WT, 145K ROT WT. - AST 7.36, ART .72, ADT 8.08. - 8.6 PPG MW IN AND OUT. 4/3/2010 00:00 - 12:00 12.00 DRILL P PROD1 DRILL AHEAD IN 6 -1/8" PRODUCTION LATERAL FROM 13,710' TO 14,469' MD. - 15K WOB. - 250 GPM, 2,190 PSI ON, 1,872 PSI OFF. - 80 RPM, 9K TQ ON, 6K TQ OFF. - 195K PU WT, 135K SO WT, 150K ROT WT. - AST 4.60, ART 3.33, ADT 7.93. - 8.7 PPG MW IN AND OUT. 12:00 - 00:00 12.00 DRILL P PROD1 DRILL AHEAD IN 6 -1/8" PRODUCTION LATERAL FROM 14,469' TO 15,094' MD. - 15K WOB. Printed: 4/22/2010 4:15:35 PM i S BP EXPLORATION Page 13 of 14 Operations Summary Report Legal Well Name: 15 -16 Common Well Name: 15 -16 Spud Date: 11/19/2001 Event Name: RE ENTER Start: 3/19/2010 End: 4/5/2010 Contractor Name: NABORS ALASKA DRILLING I Rig Release: 5/10/2010 Rig Name: NABORS 7ES Rig Number: Date From - To Hours Task Code NPT Phase Description of Operations 4/3/2010 12:00 - 00:00 12.00 DRILL P PROD1 - 250 GPM, 2,265 PSI ON, 2,000 PSI OFF. - 80 RPM, 8K TO ON, 6K TQ OFF. - 195K PU WT, 135K SO WT, 150K ROT WT. - AST 3.25, ART 4.06, ADT 7.31. - 8.7 PPG MW IN AND OUT. 4/4/2010 00:00 - 08:00 8.00 DRILL P PROD1 DRILL AHEAD IN 6 -1/8" PRODUCTION LATERAL FROM 15,094' TO 15,634' MD. 15K WOB. - 250 GPM, 2,299 PSI ON, 2,012 PSI OFF. - 80 RPM, 10K TQ ON, 8K TO OFF. - 200K PU WT, 130K SO WT, 155K ROT WT. - AST 1.94, ART 2.99, ADT 4.93. - 8.7 PPG MW IN AND OUT. 08:00 - 14:00 6.00 DRILL P PROD1 BACKREAM OUT OF HOLE FROM 15,634' TO 12,900'. - MAD PASS FROM 13,380' TO 13,070' AT 150' /HR. - 250 GPM, 1,690 PSI. - 80 RPM. - 5K TQ. - PU WT 185K, SO WT 125K, ROT WT 135K. 14:00 - 16:00 2.00 DRILL P PROD1 RIH FROM 12,900' TO 13,118' AT 90 DEGREES RIGHT ORIENTATION. - AT 90 DF1 RFFS RIGHT ORIFNTATION, TRAVFI En DOWN PILOT HOLE. - POH TO 12,900' AND ORIENTED 180 DEGREES. - RIH TO 12,955' AND TAG UP WITH 15K. - POH TO 12,920'. - WASH DOWN FROM 12,920' TO 13,024' AT 120 DEGREES LEFT ORIENTATION. - BACKREAM FROM 13,024' TO 12,920'. - RIH ORIENTED TO THE HIGH SIDE OF THE HOLE AND TAG UP WITH 15K AT 12,955'. - 250 GPM, 1,665 PSI. 16:00 - 17:00 1.00 DRILL P PROD1 TRENCH DOWN AND BACKREAM UP ORIENTED AT 180 DEGREES FROM 12,940' TO 12,960'. - RIH ORIENTED HIGH SIDE OF THE HOLE FROM 12,960' TO 13,024' AND CONFIRM IN NEW HOLE. - 250 GPM, 1,685 PSI. 17:00 - 18:30 1.50 DRILL P PROD1 BACKREAM FROM 13,024' TO 12,398' AND POH ABOVE THE 7" SHOE TO 12,366'. - 250 GPM, 1,640 PSI. - 90 RPM. - 4K TQ. - PU WT 170K, SO WT 128K, ROT WT 135K. - 8.7 PPG MW IN AND OUT. 18:30 - 20:30 2.00 DRILL P PROD1 CBU AT THE 7" SHOE. - MONITOR WELL; WELL STATIC. - DROP 1.76" BALL, PUMP TO SEAT IN CCV, AND OPEN CCV WITH 1,920 PSI. - 553 GPM, 2,146 PSI. - 55 RPM. - 4K TQ. - PU WT 170K, SO WT 128K, ROT WT 135K. - HOLE/CASING CLEANED UP THROUGHOUT Printed: 4/22/2010 4:15:35 PM • BP EXPLORATION Page 14 of 14 Operations Summary Report Legal Well Name: 15 -16 Common Well Name: 15 -16 Spud Date: 11/19/2001 Event Name: RE ENTER Start: 3/19/2010 End: 4/5/2010 Contractor Name: NABORS ALASKA DRILLING I Rig Release: 5/10/2010 Rig Name: NABORS 7ES Rig Number: Date From - To Hours Task Code NPT Phase Description of Operations 4/4/2010 18:30 - 20:30 2.00 DRILL P PROD1 CIRCULATION, BUT UNLOADED AT BU AND THEN CLEANED UP THEREAFTER. 20:30 - 00:00 3.50 DRILL P PROD1 POH WITH BHA # 7 FROM 12,366' TO 7,192'. - MONITOR WELL; WELL STATIC. - PUMP DRY JOB. - DROP 2.25" DRIFT ON STAND 129. - 8.7 PPG MW IN AND OUT. 4/5/2010 00:00 - 01:30 1.50 DRILL P PROD1 POH WITH BHA # 7 FROM 7,192' TO 3,200'. 01:30 - 03:00 1.50 DRILL P PROD1 POH WITH BHA # 7 LD 4" DP SINGLES TO THE PIPESHED FROM 3,200' TO 806'. 03:00 - 05:00 2.00 DRILL N RREP PROD1 REPAIR PIPE KICKER ON LD MACHINE IN PIPESHED. - REMAINED STUCK AFTER IT EXTENDED TO MOVE PIPE OFF SKATE. - KICKER RAM SHAFT SHEARED; KICKER RAM REMOVED AND REPLACED. 05:00 - 06:00 1.00 DRILL P PROD1 POH WITH BHA # 7 LD 4" DP SINGLES TO THE PIPESHED FROM 806' TO 235'. 06:00 - 07:30 1.50 DRILL P PROD1 LD BHA # 7 FROM 235'. - BIT GRADE: 2, 2, CT, A, X, I, BT, TD. Printed: 4/22/2010 4:1535 PM • BP EXPLORATION Page 1 of 4 Operations Summary Report Legal Well Name: 15 -16 Common Well Name: 15 -16 Spud Date: 11/19/2001 Event Name: COMPLETION Start: 4/5/2010 End: 5/10/2010 Contractor Name: NABORS ALASKA DRILLING I Rig Release: 5/10/2010 Rig Name: NABORS 7ES Rig Number: Date From - To Hours Task Code NPT Phase Description of Operations 4/5/2010 07:30 - 08:00 0.50 CASE P RUNPRD CLEAN AND CLEAR RIG FLOOR. 08:00 - 08:30 0.50 CASE P RUNPRD RU TO RIH WITH 4.5 ", 12.6 #, L -80, IBT -M PRODUCTION LINER. 08:30 - 14:00 5.50 CASE P RUNPRD RIH WITH_4,_5 ". 12.6 #, L -8Q, IRT -M PRC)nunTLON I INFRjO 3,420' ON 4" DP STANDS. - PJSM WITH ALL HANDS. - MU SHOE TRACT AND BAKER -LOC FIRST THREE JTS. - CHECK FLOATS; CHECKED GOOD. - AVERAGE MU TQ = 2,116 FT LBS. 14:00 - 16:00 2.00 CASE P RUNPRD MU 4" BAKER "HRD -E" ZXPN LINER TOP PACKER AND FLEX -LOCK LINER HANGER. - MIX AND POUR PAL -MIX INTO LTP ASSEMBLY. - PU 4" DP SINGLE AND A 10' AND 15' 4" DP PUP JT TO 3,477'. - STAGE TO 5 BPM, 179 PSI AND CIRCULATE 78 BBLS. - PU WT 65K, SO WT 65K. 16:00 - 00:00 8.00 CASE P RUNPRD RIH WITH 4.5 ", 12.6 #, L -80, IBT -M PRODUCTION LINER FROM 3,477' TO THE 7" SHOE AT 12,398' ON 4" AND 5" DP STANDS. - AVERAGE MU TQ = 2,116 FT LBS. - PU WT 160K, SO WT 120K. 4/6/2010 00:00 - 01:00 1.00 CASE P RUNPRD CIRCULATE 1 -1/2 LINER AND 4 "/5" DP VOLUMES AT THE 7" SHOE AT 12,398'. - 220 BBLS, STAGED UP TO 6 BPM, 800 PSI. 01:00 - 04:30 3.50 CASE P RUNPRD RIH WITH 4.5 ", 12.6 #, L -80, IBT -M PRODUCTION LINER FROM 12,398' TO 15,634' ON 5" DP STANDS. - AVERAGE MU TQ = 2,116 FT LBS. - RABBIT 5" DP NOT YET RABBITTED FROM THE DERRICK. - PU WT 185K, SO WT 125K. - TAGGED UP TWICE ON BOTTOM AND PU TO NEUTRAL AND THEN UP 2' TO 15,632' 4.5" SHOE SETTING DEPTH. 04:30 - 05:00 0.50 CASE P RUNPRD CIRCULATE TO PREP HOLE FOR CEMENT JOB. - STAGE UP FROM 2 BPM, 800 PSI; 3 BPM, 968 PSI; 4 BPM, 1,135 PSI; AND 5 BPM, 1,345 PSI. - HAD FULL RETURNS THROUGHOUT. 05:00 - 08:00 3.00 CEMT P RUNPRD 4.5" PRODUCTION LINER CEMENT JOB. - PJSM WITH ALL HANDS INVOLVED IN CEMENT JOB. - PUMPED 25 BBLS OF 11 PPG MUDPUSH II STARTING AT 0606 HRS. - PT LINES TO 4,500 PSI; TESTED GOOD. - PUMPED 86 BBLS OF 15.8 PPG CLASS G CEMENT STARTING AT 0622 HRS; PUMPED @ 5 BPM, WITH ICP AT 928 PSI AND FCP AT 269 PSI. - DROPPED DP WIPER DART (POSITIVE TOGGLE INDICATION WHEN LEAVING CEMENT HEAD). - SWITCHED TO RIG PUMPS FOR THE ENTIRE DISPLACEMENT. - DISPLACED WITH AN 82 -BBL PERFORATION PILL (LINER VOLUME PLUS 30 BBLS) AND THE REMAINDER WAS 8.7 PPG FLO -PRO. - LATCHED UP WITH LINER WIPER PLUG AT 2,674 STROKES AND SAW A 1,100 TO 2,250 PSI SPIKE. Printed: 4/22/2010 4:16:14 PM • • BP EXPLORATION Page 2 of 4 Operations Summary Report Legal Well Name: 15 -16 Common Well Name: 15 -16 Spud Date: 11/19/2001 Event Name: COMPLETION Start: 4/5/2010 End: 5/10/2010 Contractor Name: NABORS ALASKA DRILLING I Rig Release: 5/10/2010 Rig Name: NABORS 7ES Rig Number: Date From - To Hours Task Code NPT Phase Description of Operations 4/6/2010 05:00 - 08:00 3.00 CEMT P RUNPRD - DISPLACED WITH -204 BBLS AT 4.5 BPM, 515 -939 PSI UNTIL -400 STROKES BEFORE BUMPING THE PLUG. SLOWED THE PUMP RATE TO 3 BPM IN PREPARATION FOR BUMPING PLUG. BUMPED PLUG AT 3,557 STKS, 204 BBLS. - PRESSURED UP TO 3,300 PSI IMMEDIATELY AFTER BUMPING PLUG TO SET HANGER. - SET DOWN 50K TO VERIFY HANGER SET. - BLED OFF PRESSURE AND CHECKED FLOATS; FLOATS HELD. - PRESSURED UP TO 4,450 PSI TO RELEASE THE LINER SETTING /RUNNING TOOL. - PICKED UP TO EXPOSE DOGS AND SET PACKER. - SET DOWN 50K AND HAD GOOD SURFACE INDICATION OF SHEAR AT 40K; SET DOWN AGAIN TO 75K TO CONFIRM SETTING OF PACKER. - PRESSURED UP TO 1,000 PSI TO STING OUT OF THE LINER TOP PACKER. - HAD FULL RETURNS THROUGHOUT., - RECIPROCATED IN 10' STROKES THROUGHOUT. - POSITIONED LINER ON DEPTH FOR CEMENT ROUNDING SHOE AND DP /LINER WIPER LATCH UP. - TOTAL CEMENT PUMPED: TAIL SLURRY, 15.8 PPG -- 86 , BBLS, 415 SKS, 1.17 CU FT /SK_, "'CEMENT IN PLACE AT 0744 HRS. * ** 08:00 - 09:00 1.00 CEMT P RUNPRD UNSTUNG FROM LINER TOP PACKER AND BROUGHT THE PUMPS TO 460 GPM, 2,100 PSI AND CBU TO REMOVE EXCESS CEMENT AND MUD PUSH II FROM HOLE. - SAW MUD PUSH II AND -17 BBLS OF EXCESS CEMENT RETURNS TO SURFACE. 09:00 - 09:30 0.50 CEMT P RUNPRD RD LINER CEMENTING HEAD 09:30 - 11:30 2.00 CASE P RUNPRD DISPLACE WELL TO 8.5 PPG SEAWATER - 460 GPM, 2052 PSI 11:30 - 16:30 5.00 CASE P RUNPRD PUMP DRY JOB AND POOH FROM 12218' TO 791' MD 16:30 - 18:00 1.50 CASE P RUNPRD LD 4" DP FROM 791. SERVICE BREAK AND LD RUNNING TOOL. CONFIRMED DOG SUB SHEARED. 18:00 - 20:00 2.00 PERFOB P OTHCMP RU TO RUN PERF GUNS. 20:00 - 23:00 3.00 PERFOB P OTHCMP RUN PERF GUNS TO 1677 MD - 39K PUW, 39K SOW 23:00 - 00:00 1.00 PERFOB P OTHCMP RU AND RIH WITH 2 -7/8" FOX PIPE FROM 1677' TO 1989' MD - 40K PUW, 40K SOW 4/7/2010 00:00 - 02:30 2.50 PERFOB P OTHCMP RIH FROM 1989' TO 3478' MD WITH 2 -7/8" FOX PIPE. CHANGEOUT ELEVATORS AND SLIPS FOR 4" DRILL PIPE 02:30 - 07:30 5.00 PERFOB P OTHCMP RIH FROM 2660' TO 15,540' WITH 4" AND 5" DRILL PIPE. 07:30 - 08:00 0.50 PERFOB P OTHCMP TAG ON WIPER PLUG IN LANDING COLLAR AND PU TO UPWEIGHT ON DEPTH. NO CORRECTION NEEDED. PULL UP TO 15020' MD TO PLACE GUNS ON DEPTH. 08:00 - 09:00 1.00 PERFOB P OTHCMP RU TO TEST LINER. PIPE DID NOT SELF FILL ON LAST 10 -15 STANDS. FILL PIPE AND CATCH PRESSURE. ATTEMPT TO CIRCULATE - PRESSURE UP TO 2500 PSI WITH ONLY A TRICKLE OF RETURNS. Printed: 4/22/2010 4:16:14 PM • BP EXPLORATION Page 3 of 4 Operations Summary Report Legal Well Name: 15 -16 Common Well Name: 15 -16 Spud Date: 11/19/2001 Event Name: COMPLETION Start: 4/5/2010 End: 5/10/2010 Contractor Name: NABORS ALASKA DRILLING I Rig Release: 5/10/2010 Rig Name: NABORS 7ES Rig Number: Date From - To Hours Task Code NPT Phase Description of Operations 4/7/2010 09:00 - 10:00 1.00 PERFOB P OTHCMP TEST LINER TO 3500 PSI FOR 30 MIN. RD AND BLOW DOWN LINES. INIT PRESS - 3656 PSI, 15 MIN PRESS - 3633 PSI, 30 MIN PRESS 3623 PSI 10:00 - 11:00 1.00 PERFOB P OTHCMP SCREW BACK INTO DRILL STRING, BREAK CIRCULATION BEFORE MOVING PIPE. 73 GPM, 257 PSI. DROP DOWN AND PULL UP INTO POSITION WITH GUNS ON DEPTH. RUN THROUGH FIRING SEQUENCE AND FIRE GUNS. INITIAL FLUID LOSS OF 7 BBS. PERFORATE THE FOLLOWING INTERVALS: 13380' - 13820' MD a> 14000' - 14450' MD �¢ 14600' - 14630' MD 14670' - 14750' MD 14850' - 15020' MD 2.88" GUNS W/6 SPF & 60 DEG PHASING 2906 POWERJET HMX CHARGES 11:00 - 12:00 1.00 PERFOB P OTHCMP POOH FROM 15,020' TO 13,261' MD TO BRING PERF GUNS ABOVE TOP PERF. - 175K PUW, 125K SOW 12:00 - 13:00 1.00 PERFOB P OTHCMP CIRCULATE 448 BBLS. LOST 2.5 BBLS DURING CIRCULATION. - 284 GPM, 1430 PSI - 165K PUW, 130K SOW 13:00 - 22:00 9.00 PERFOB P OTHCMP MONITOR WELL, STATIC. LD DRILL PIPE FROM 13,261' TO 3478' MD - 50K PUW, 50K SOW RIH WITH 1 STAND OF 5" DP TO 3575' MD 22:00 - 22:30 0.50 PERFOB P OTHCMP SLIP AND CUT 124' OF DRILLING LINE. 22:30 - 23:00 0.50 PERFOB P OTHCMP INSPECT DRAWWORKS AND SERVICE TOPDRIVE. 23:00 - 00:00 1.00 PERFOB P OTHCMP RIH WITH STANDS OF 5" DP FROM 3575' TO 5933' MD 18 BBLS OF SEAWATER LOST TO WELL FOR DAY 4/8/2010 00:00 - 01:30 1.50 PERFOB P OTHCMP LD 5" DRILL PIPE FROM 5933' TO 3480' MD 01:30 - 02:00 0.50 PERFOB P OTHCMP RU EQUIPMENT TO LD 2 -7/8" FOX PIPE. 02:00 - 02:30 0.50 PERFOB P OTHCMP LD 2 -7/8" FOX PIPE FROM 3475' TO 3010' MD. 02:30 - 03:30 1.00 PERFOB N SFAL OTHCMP BOLT ON TOP PLATE ON 2 -7/8" ELEVATORS STRIPPED OUT. WAIT ON NEW SET OF ELEVATORS TO BE DELIVERED TO RIG. 03:30 - 05:00 1.50 PERFOB P OTHCMP CONTINUE TO LD FOX PIPE FROM 3010' MD TO 1677' MD 05:00 - 06:00 1.00 PERFOB P OTHCMP PJSM, RU EQUIPMENT TO LD PERF GUNS 06:00 - 08:30 2.50 PERFOB P OTHCMP LD PERF GUNS FROM 1677' MD. 08:30 - 09:30 1.00 PERFOB P OTHCMP RD GUN HANDLING EQUIPMENT. CLEAN AND CLEAR RIG FLOOR. 09:30 - 12:00 2.50 RUNCOMP RUNCMP PULL WEAR RING AND MAKE DUMMY RUN WITH HANGER. RU COMPENSATOR, TORQUE TURN EQUIPMENT, SINGLE JOINT ELEVATORS, STABBING BOARD AND GUIDE. 12:00 - 00:00 12.00 RUNCOMP RUNCMP RUN 4.5" 12.6# 13CR85 VAMTOP COMPLETION TO 8547' MD. TORQE TURN TO 4440 LBS /FT. 4/9/2010 00:00 - 06:30 6.50 RUNCOMP RUNCMP RIH WITH 4.5" TUBING FROM 8547' AND TAG UP INSIDE OF POLISHED BORE RECEPTICAL AT 12233' MD. SPACE Printed: 4/22/2010 4:16:14 PM S BP EXPLORATION Page 4 of 4 Operations Summary Report Legal Well Name: 15 -16 Common Well Name: 15 -16 Spud Date: 11/19/2001 Event Name: COMPLETION Start: 4/5/2010 End: 5/10/2010 Contractor Name: NABORS ALASKA DRILLING I Rig Release: 5/10/2010 Rig Name: NABORS 7ES Rig Number: Date From - To Hours Task Code NPT Phase Description of Operations 4/9/2010 00:00 - 06:30 6.50 RUNCOMP RUNCMP OUT COMPLETION WITH 19.58' AND 2.14' PUP JOINTS. PICK UP HANGER AND LAND TUBING. RUN IN LDS. 06:30 - 10:00 3.50 RUNCOMP RUNCMP REVERSE CIRCULATE 186 BBLS OF CLEAN SEAWATER FOLLOWED BY 193 BBLS OF SEAWATER TREATED WITH CORROSION INHIBITOR FOLLOWED BY 189 BBLS OF CLEAN SEAWATER. - 159 GPM, 319 PSI 10:00 - 12:00 2.00 RUNCOMP RUNCMP _PRESSURE UP TO 3640 PS_TQSET PACKER AND PRESSURE TEST TUBING TO 3500 PSI FOR 30 MIN. LOST 13 PSI IN THE FIRST 15 MIN AND 1 PSI IN THE SECOND 15 MIN. BLEED OFF TUBING PRESSURE TO 1500 PSI AND PRESSURE UP IA TO 3500 PSI AND TEST FOR 30 MIN. LOST 20 PSI IN THE FIRST 15 MIN AND 5 PSI IN THE SECOND 15 MIN. 12:00 - 14:00 2.00 RUNCOMP RUNCMP BLEED OFF ANNULUS AND THEN TUBING. PRESSURE UP IA TO 2600' TO SHEAR DCR VALVE. PUMP 2 BBLS EACH WAY TO CONFIRM SHEAR. INSTALL TWC AND PRESSURE TEST FROM ABOVE AND BELOW TO 1000 PSI FOR 10 MIN. RD AND BLOW DOWN LINES. 14:00 - 16:00 2.00 BOPSUP P RUNCMP ND AND_ SET BACK BOPE. 16:00 - 19:30 3.50 WHSUR P RUNCMP NU ADAPTER FLANGE AND TREE. PRESSURE TEST ADAPTER AND PACKOFF TO 5000 PSI FOR 30 MIN. PRESSURE TEST TREE WITH DIESEL TO 5000 PSI FOR 10 MIN. 19:30 - 20:30 1.00 WHSUR P RUNCMP RU AND TEST DSM LUBRICATOR TO 500 PSI. PULL TWC. 20:30 - 00:00 3.50 WHSUR P RUNCMP PJSM, RU LITTLE RED AND PRESSURE TEST LINES TO 3500 PSI. PUMP 152 BBLS OF DIESEL DOWN THE IA. BLOW DOWN AND SWAP LINE TO ALLOW DIESEL TO U -TUBE. INSTALL BPV. TEST TO 1000 PSI FROM BELOW. INSTALL VR PLUGS IN OA. RELEASE RIG TO DS 15 -27 AT ON 4/10/2010 AT 00:00 HRS Printed: 4/22/2010 4:16:14 PM by 10 DS15- 16BPB1 Survey Report Schlumberger - Report Date: 1- Apr -10 Survey 1 DLS Computation Method: Minimum Curvature / Lubinski Client: BP Exploration Alaska Vertical Section Azimuth: 38.540° Field: Prudhoe Bay Unit - EOA Vertical Section Origin: N 0.000 ft, E 0.000 ft Structure 1 Slot: DS -15 / 15 -16 TVD Reference Datum: Rotary Table Well: 15 -16 TVD Reference Elevation: 61.00 ft relative to MSL Borehole: 15- 16BPB1 Sea Bed 1 Ground Level Elevation: 32.80 ft relative to MSL UWI /API #: 500292111570 Magnetic Declination: 22.310° Survey Name 1 Date: 15- 16BPB1 / April 1, 2010 Total Field Strength: 57689.582 nT Tort/ AHD 1 DDI 1 ERD ratio: 265.873° / 8079.62 ft / 6.512 / 0.923 Magnetic Dip: 80.946° Grid Coordinate System: NAD27 Alaska State Planes, Zone 04, US Feet Declination Date: March 25, 2010 Location LatlLong: N 7017 52.919, W 148 34 26.072 Magnetic Declination Model: BGGM 2009 Location Grid N/E Y /X: N 5960630.760 ftUS, E 676088.190 ftUS North Reference: True North • Grid Convergence Angle: +1.34263779° Total Corr Mag North -> True North: +22.310° Grid Scale Factor: 0.99993522 Local Coordinates Referenced To: Well Head Measured Azimuth Vertical Along Hole NS I EW Comments Inclination Sub -Sea ND TVD Closure DLS Northing Easting Latitude Longitude Depth True Section Departure True North True North (ft ) (deg) (deg) (ft ) (ft) I (ft) (ft) I (ft) I (ft) (ft) I (deg1100ft) (ftUS) (ftUS) Projected -Up 0.00 0.00 0.00 -61.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 5960630.76 676088.19 N 70 17 52.919 W 148 34 26.072 WRP 30.00 0.00 0.00 -31.00 30.00 0.00 0.00 0.00 0.00 0.00 0.00 5960630.76 676088.19 N 70 17 52.919 W 148 34 26.072 GYRODATA 2/18/99 AK0299GCE523 90.00 0.37 179.86 29.00 90.00 -0.15 0.19 0.19 -0.19 0.00 0.62 5960630.57 676088.20 N 70 17 52.917 W 148 34 26.072 GYRO 190.00 0.43 158.08 129.00 190.00 -0.59 0.88 0.88 -0.86 0.14 0.16 5960629.90 676088.35 N 70 17 52.910 W 148 34 26.068 290.00 0.36 180.27 228.99 289.99 -1.02 1.56 1.55 -1.53 0.28 0.17 5960629.24 676088.51 N 70 17 52.904 W 148 34 26.064 390.00 0.51 168.24 328.99 389.99 -1.55 2.32 2.31 -2.28 0.37 0.17 5960628.49 676088.61 N 70 17 52.896 W 148 34 26.061 490.00 0.43 179.07 428.99 489.99 -2.12 3.14 3.12 -3.09 0.47 0.12 5960627.68 676088.73 N 70 17 52.889 W 148 34 26.059 590.00 0.49 164.12 528.99 589.99 -2.66 3.94 3.92 -3.87 0.59 0.13 5960626.90 676088.87 N 70 17 52.881 W 148 34 26.055 690.00 0.41 178.64 628.98 689.98 -3.19 4.72 4.70 -4.64 0.71 0.14 5960626.14 676089.01 N 70 17 52.873 W 148 34 26.051 790.00 0.12 121.30 728.98 789.98 -3.45 5.15 5.12 -5.06 0.81 0.36 5960625.73 676089.12 N 70 17 52.869 W 148 34 26.049 890.00 0.37 81.65 828.98 889.98 -3.20 5.57 5.21 -5.06 1.22 0.29 5960625.73 676089.53 N 70 17 52.869 W 148 34 7 990.00 0.43 85.77 928.98 989.98 -2.71 6.27 5.34 -4.99 1.92 0.07 5960625.82 676090.22 N 70 17 52.870 W 148 34 2 . 16 1090.00 0.32 93.93 1028.98 1089.98 -2.30 6.92 5.60 -4.98 2.57 0.12 5960625.84 676090.87 N 70 17 52.870 W 148 34 25.997 1190.00 0.30 72.48 1128.97 1189.97 -1.92 7.45 5.81 -4.92 3.10 0.12 5960625.91 676091.40 N 70 17 52.870 W 148 34 25.982 1290.00 0.40 81.01 1228.97 1289.97 -1.44 8.06 6.04 -4.79 3.69 0.11 5960626.06 676091.99 N 70 17 52.872 W 148 34 25.965 1390.00 0.40 115.46 1328.97 1389.97 -1.11 8.74 6.54 -4.88 4.35 0.24 5960625.98 676092.65 N 70 17 52.871 W 148 34 25.945 1490.00 0.31 96.64 1428.97 1489.97 -0.89 9.35 7.07 -5.06 4.93 0.15 5960625.81 676093.24 N 70 17 52.869 W 148 34 25.928 1590.00 0.46 131.91 1528.97 1589.97 -0.77 10.01 7.68 -5.36 5.50 0.27 5960625.53 676093.82 N 70 17 52.866 W 148 34 25.912 1690.00 0.41 126.75 1628.96 1689.96 -0.78 10.77 8.44 -5.85 6.09 0.06 5960625.06 676094.41 N 70 17 52.861 W 148 34 25.895 1790.00 0.28 164.95 1728.96 1789.96 -0.91 11.35 9.00 -6.30 6.44 0.26 5960624.62 676094.77 N 70 17 52.857 W 148 34 25.885 1890.00 0.34 163.56 1828.96 1889.96 -1.23 11.89 9.48 -6.82 6.58 0.06 5960624.10 676094.93 N 70 17 52.852 W 148 34 25.880 1990.00 0.53 67.10 1928.96 1989.96 -0.99 12.49 9.91 -6.92 7.09 0.66 5960624.01 676095.44 N 70 17 52.851 W 148 34 25.865 2090.00 0.64 69.28 2028.95 2089.95 -0.11 13.51 10.37 -6.54 8.04 0.11 5960624.41 676096.38 N 70 17 52.855 W 148 34 25.838 2190.00 0.60 82.25 2128.95 2189.95 0.75 14.59 11.04 -6.27 9.08 0.15 5960624.70 676097.42 N 70 17 52.857 W 148 34 25.807 2290.00 0.86 153.02 2228.94 2289.94 0.82 15.71 12.09 -6.87 9.94 0.87 5960624.12 676098.29 N 70 17 52.851 W 148 34 25.782 2390.00 0.96 160.89 2328.93 2389.93 0.06 17.30 13.45 -8.33 10.56 0.16 5960622.68 676098.94 N 70 17 52.837 W 148 34 25.764 13 -3/8" Csg 2485.00 0.89 153.98 2423.92 2484.92 -0.68 18.83 14.81 -9.75 11.14 0.14 5960621.27 676099.56 N 70 17 52.823 W 148 34 25.747 2490.00 0.89 153.59 2428.92 2489.92 -0.72 18.91 14.88 -9.82 11.18 0.14 5960621.21 676099.59 N 70 17 52.822 W 148 34 25.746 SurveyEditor Ver SP 2.1 Bld( users) 15- 16 \15- 16 \15- 16BPB1 \15- 16BPB1 Generated 5/6/2010 1:12 PM Page 1 of 5 Measured Azimuth Vertical Along Hole NS EW Comments Inclination Sub•Sea TVD TVD Closure DLS Northing Easting Latitude Longitude Depth True Section Departure True North True North p P (ft) I (deb) (deg) (ft ) (ft ) (ft ) (ft) I (ft) I (ft) (ft ) (deg /100ft ) (ftUS) (ftUS) 2590.00 1.43 24.44 2528.90 2589.90 0.17 20.27 15.26 -9.38 12.04 2.11 5960621.67 676100.45 N 70 17 52.827 W 148 34 25.721 2690.00 4.99 19.36 2628.73 2689.73 5.48 25.86 14.60 -4.14 14.00 3.57 5960626.95 676102.28 N 70 17 52.878 W 148 34 25.664 2790.00 6.55 12.61 2728.22 2789.22 14.72 35.90 17.58 5.53 16.69 1.70 5960636.68 676104.74 N 70 17 52.973 W 148 34 25.586 2890.00 8.25 7.65 2827.39 2888.39 26.01 48.78 26.23 18.21 18.89 1.81 5960649.40 676106.64 N 70 17 53.098 W 148 34 25.522 2990.00 9.99 13.86 2926.12 2987.12 40.05 64.61 40.24 33.74 21.92 2.00 5960665.00 676109.31 N 70 17 53.251 W 148 34 25.433 3090.00 11.39 28.91 3024.40 3085.40 57.67 83.06 58.39 50.81 28.77 3.11 5960682.23 676115.76 N 70 17 53.419 W 148 34 25.234 3190.00 12.85 35.21 3122.18 3183.18 78.51 104.03 79.34 68.54 39.96 1.97 5960700.22 676126.53 N 70 17 53.593 W 148 34 24.907 3290.00 13.38 25.23 3219.58 3280.58 100.87 126.67 101.95 88.10 51.30 2.32 5960720.03 676137.41 N 70 17 53.785 W 148 34 24.577 3340.00 14.04 24.08 3268.16 3329.16 112.38 138.52 113.75 98.87 56.24 1.43 5960730.91 676142.10 N 70 17 53.891 W 148 34 24.433 3390.00 14.79 23.96 3316.58 3377.58 124.42 150.96 126.14 110.24 61.31 1.50 5960742.40 676146.90 N 70 17 54.003 W 148 34 24.285 3440.00 15.54 24.87 3364.84 3425.84 137.11 164.04 139.18 122.15 66.72 1.57 5960754.43 676152.02 N 70 17 54.120 W 148 34 24.127 3490.00 16.40 26.22 3412.91 3473.91 150.51 177.80 152.92 134.56 72.65 1.87 5960766.97 676157.67 N 70 17 54.242 W 148 34 .4 3540.00 17.20 27.38 3460.78 3521.78 164.66 192.25 167.36 147.45 79.17 1.73 5960780.02 676163.88 N 70 17 54.369 W 148 34 23.764 3590.00 18.81 29.52 3508.33 3569.33 179.88 207.70 182.82 161.03 86.55 3.48 5960793.77 676170.93 N 70 17 54.503 W 148 34 23.549 3640.00 20.34 30.37 3555.43 3616.43 196.44 224.46 199.56 175.54 94.91 3.11 5960808.47 676178.96 N 70 17 54.645 W 148 34 23.306 3690.00 21.45 31.12 3602.15 3663.15 214.11 242.29 217.38 190.87 104.03 2.28 5960824.00 676187.71 N 70 17 54.796 W 148 34 23.040 3740.00 22.83 31.56 3648.46 3709.46 232.80 261.13 236.20 206.96 113.83 2.78 5960840.32 676197.13 N 70 17 54.954 W 148 34 22.754 3790.00 24.12 31.76 3694.32 3755.32 252.58 281.05 256.10 223.91 124.29 2.58 5960857.51 676207.19 N 70 17 55.121 W 148 34 22.449 3840.00 25.64 31.75 3739.68 3800.68 273.47 302.08 277.11 241.80 135.36 3.04 5960875.65 676217.84 N 70 17 55.297 W 148 34 22.126 3890.00 27.86 31.39 3784.32 3845.32 295.80 324.59 299.60 260.98 147.14 4.45 5960895.09 676229.16 N 70 17 55.486 W 148 34 21.783 3940.00 29.43 31.59 3828.20 3889.20 319.59 348.55 323.55 281.41 159.66 3.15 5960915.82 676241.20 N 70 17 55.687 W 148 34 21.418 3990.00 31.04 31.61 3871.40 3932.40 344.58 373.73 348.71 302.86 172.85 3.22 5960937.56 676253.88 N 70 17 55.897 W 148 34 21.033 4040.00 32.33 31.79 3913.95 3974.95 370.66 399.99 374.96 325.20 186.65 2.59 5960960.22 676267.16 N 70 17 56.117 W 148 34 20.631 4090.00 33.53 32.30 3955.91 4016.91 397.66 427.17 402.12 348.24 201.07 2.46 5960983.59 676281.04 N 70 17 56.344 W 148 34 20.211 4140.00 34.98 32.84 3997.24 4058.24 425.65 455.32 430.24 371.95 216.23 2.96 5961007.65 676295.63 N 70 17 56.577 W 148 34 19.769 4190.00 36.31 33.17 4037.87 4098.87 454.66 484.45 459.34 396.39 232.10 2.69 5961032.45 676310.92 N 70 17 56.817 W 148 34 19.306 4240.00 38.51 33.62 4077.58 4138.58 484.91 514.83 489.67 421.75 248.82 4.43 5961058.19 676327.04 N 70 17 57.067 W 148 34 18.819 4290.00 40.39 33.70 4116.19 4177.19 516.56 546.60 521.40 448.19 266.43 3.76 5961085.04 676344.03 N 70 17 57.327 W 148 34 18.305 4340.00 42.01 33.81 4153.81 4214.81 549.38 579.53 554.29 475.57 284.73 3.24 5961112.84 676361.68 N 70 17 57.596 W 148 34 17.772 4390.00 43.50 33.74 4190.52 4251.52 583.20 613.47 588.19 503.78 303.60 2.98 5961141.48 676379.88 N 70 17 57.873 W 148 34 02 4440.00 44.46 33.81 4226.50 4287.50 617.80 648.19 622.87 532.64 322.90 1.92 5961170.79 676398.50 N 70 17 58.157 W 148 34 9 4490.00 45.45 33.90 4261.88 4322.88 653.01 683.52 658.17 561.98 342.58 1.98 5961200.57 676417.48 N 70 17 58.446 W 148 34 16.085 Tie -In Survey 4540.00 47.24 34.25 4296.40 4357.40 689.08 719.69 694.30 591.94 362.85 3.62 5961231.00 676437.04 N 70 17 58.740 W 148 34 15.494 TOW (Blind) 4587.00 49.09 34.55 4327.74 4388.74 724.00 754.71 729.27 620.83 382.63 3.96 5961260.35 676456.15 N 70 17 59.025 W 148 34 14.918 BOW 4604.00 49.90 37.00 4338.79 4399.79 736.91 767.63 742.17 631.32 390.19 11.95 5961271.00 676463.45 N 70 17 59.128 W 148 34 14.697 Inc +Trend 4626.54 49.22 38.00 4353.41 4414.41 754.06 784.79 759.23 644.93 400.63 4.53 5961284.85 676473.57 N 70 17 59.262 W 148 34 14.393 4720.47 51.78 43.80 4413.18 4474.18 826.42 857.24 830.82 699.62 448.10 5.49 5961340.64 676519.74 N 70 17 59.799 W 148 34 13.009 MWD +GMAG 4813.93 56.37 48.05 4468.02 4529.02 901.41 932.89 904.58 752.17 502.49 6.14 5961394.45 676572.89 N 70 18 0.316 W 148 34 11.423 4906.86 59.65 44.78 4517.25 4578.25 979.46 1011.69 981.61 806.52 559.53 4.62 5961450.12 676628.64 N 70 18 0.851 W 148 34 9.760 5003.33 62.85 48.04 4563.66 4624.66 1063.21 1096.25 1064.54 864.79 620.80 4.45 5961509.80 676688.51 N 70 18 1.424 W 148 34 7.974 5096.00 65.42 41.60 4604.11 4665.11 1146.04 1179.61 1146.89 923.93 679.49 6.84 5961570.29 676745.80 N 70 18 2.005 W 148 34 6.263 5193.19 66.05 41.60 4644.06 4705.06 1234.51 1268.22 1235.14 990.19 738.32 0.65 5961637.91 676803.06 N 70 18 2.657 W 148 34 4.547 5286.33 66.86 41.77 4681.26 4742.26 1319.77 1353.60 1320.23 1053.95 795.10 0.89 5961702.98 676858.33 N 70 18 3.284 W 148 34 2.892 5378.55 66.00 40.77 4718.14 4779.14 1404.20 1438.13 1404.53 1117.48 850.86 1.36 5961767.79 676912.57 N 70 18 3.909 W 148 34 1.266 5472.62 64.46 39.04 4757.55 4818.55 1489.58 1523.54 1489.86 1182.99 905.65 2.34 5961834.57 676965.82 N 70 18 4.553 W 148 33 59.668 5570.80 65.40 38.90 4799.15 4860.15 1578.51 1612.47 1578.76 1252.13 961.58 0.97 5961904.99 677020.11 N 70 18 5.233 W 148 33 58.037 5666.46 63.33 38.54 4840.54 4901.54 1664.75 1698.71 1664.98 1319.42 1015.53 2.19 5961973.52 677072.46 N 70 18 5.895 W 148 33 56.464 SurveyEditor Ver SP 2.1 Bld( users) 15- 16 \15- 16 \15- 16BPB1 \15- 16BPB1 Generated 5/6/2010 1:12 PM Page 2 of 5 Measured Azimuth Vertical Along Hole NS EW Comments Depth Inclination True Sub -Sea TVD TVD Section Departure Closure True North True North DLS Northing Easting Latitude Longitude (ft) (deg) (deg) (ft ) (ft ) (ft) _ (ft) (ft ) (ft ) (ft ) (degl100ft ) (ftUS) (ftUS) 5757.98 63.20 38.03 4881.71 4942.71 1746.48 1780.44 1746.71 1383.57 1066.17 0.52 5962038.84 677121.58 N 70 18 6.525 W 148 33 54.988 5852.93 63.06 39.82 4924.63 4985.63 1831.17 1865.14 1831.38 1449.46 1119.38 1.69 5962105.95 677173.23 N 70 18 7.173 W 148 33 53.436 5947.04 63.90 43.51 4966.66 5027.66 1915.24 1949.34 1915.37 1512.35 1175.36 3.62 5962170.13 677227.71 N 70 18 7.792 W 148 33 51.804 6041.27 64.55 44.66 5007.63 5068.63 1999.69 2034.19 1999.75 1573.30 1234.39 1.30 5962232.44 677285.30 N 70 18 8.391 W 148 33 50.082 6136.26 64.38 47.07 5048.59 5109.59 2084.69 2119.90 2084.70 1632.98 1295.90 2.30 5962293.54 677345.39 N 70 18 8.978 W 148 33 48.288 6230.93 65.05 46.45 5089.02 5150.02 2169.41 2205.50 2169.43 1691.62 1358.26 0.92 5962353.62 677406.35 N 70 18 9.555 W 148 33 46.470 6259.71 65.49 46.48 5101.06 5162.06 2195.30 2231.64 2195.34 1709.62 1377.21 1.53 5962372.07 677424.87 N 70 18 9.732 W 148 33 45.917 6318.80 67.15 45.22 5124.79 5185.79 2248.98 2285.76 2249.06 1747.32 1416.03 3.42 5962410.66 677462.80 N 70 18 10.102 W 148 33 44.785 6368.92 63.86 46.23 5145.57 5206.57 2294.22 2331.36 2294.35 1779.15 1448.68 6.82 5962443.25 677494.69 N 70 18 10.415 W 148 33 43.833 6410.76 61.23 46.69 5164.86 5225.86 2330.99 2368.48 2331.18 1804.73 1475.59 6.36 5962469.45 677520.99 N 70 18 10.667 W 148 33 43.048 6504.67 61.20 47.28 5210.08 5271.08 2412.40 2450.79 2412.77 1860.88 1535.77 0.55 5962526.98 677579.83 N 70 18 11.219 W 148 33 41.293 6596.18 61.28 48.08 5254.11 5315.11 2491.61 2531.01 2492.20 1914.89 1595.08 0.77 5962582.37 677637.86 N 70 18 11.750 W 148 33 0 4 6699.05 61.46 47.28 5303.40 5364.40 2580.75 2621.30 2581.67 1975.68 1661.84 0.70 5962644.70 677703.18 N 70 18 12.348 W 148 33 7 6796.68 61.11 47.94 5350.31 5411.31 2665.30 2706.93 2666.58 2033.40 1725.08 0.69 5962703.89 677765.04 N 70 18 12.915 W 148 33 35.772 6886.49 61.53 47.54 5393.41 5454.41 2743.08 2785.72 2744.73 2086.39 1783.39 0.61 5962758.22 677822.09 N 70 18 13.436 W 148 33 34.072 6980.91 60.83 46.42 5438.93 5499.93 2824.91 2868.44 2826.94 2142.83 1843.88 1.28 5962816.06 677881.23 N 70 18 13.991 W 148 33 32.308 7075.82 62.24 46.48 5484.16 5545.16 2907.55 2951.87 2909.97 2200.31 1904.35 1.49 5962874.94 677940.33 N 70 18 14.556 W 148 33 30.544 7170.28 61.35 44.92 5528.81 5589.81 2990.14 3035.12 2992.92 2258.44 1963.92 1.73 5962934.45 677998.53 N 70 18 15.128 W 148 33 28.806 7264.26 61.13 43.53 5574.03 5635.03 3072.12 3117.50 3075.18 2317.48 2021.39 1.32 5962994.81 678054.59 N 70 18 15.708 W 148 33 27.130 7357.92 64.10 44.99 5617.10 5678.10 3154.85 3200.66 3158.20 2377.02 2079.43 3.46 5963055.69 678111.22 N 70 18 16.294 W 148 33 25.437 7453.73 66.20 45.16 5657.37 5718.37 3241.22 3287.59 3244.94 2438.41 2140.98 2.20 5963118.50 678171.31 N 70 18 16.897 W 148 33 23.642 7548.68 66.40 45.16 5695.53 5756.53 3327.58 3374.53 3331.69 2499.72 2202.63 0.21 5963181.23 678231.50 N 70 18 17.500 W 148 33 21.844 7643.91 66.66 45.51 5733.46 5794.46 3414.32 3461.88 3418.84 2561.12 2264.76 0.43 5963244.07 678292.17 N 70 18 18.104 W 148 33 20.032 7734.70 66.23 45.30 5769.74 5830.74 3496.95 3545.11 3501.87 2619.55 2324.02 0.52 5963303.87 678350.04 N 70 18 18.678 W 148 33 18.303 7829.73 66.95 45.54 5807.50 5868.50 3583.53 3632.32 3588.89 2680.76 2386.14 0.79 5963366.51 678410.70 N 70 18 19.280 W 148 33 16.491 7924.91 66.18 45.79 5845.35 5906.35 3670.18 3719.64 3676.01 2741.79 2448.60 0.84 5963428.99 678471.71 N 70 18 19.880 W 148 33 14.669 8022.53 66.32 45.30 5884.67 5945.67 3758.87 3809.00 3765.17 2804.37 2512.38 0.48 5963493.04 678534.00 N 70 18 20.495 W 148 33 12.809 8116.99 65.94 44.40 5922.89 5983.89 3844.72 3895.38 3851.44 2865.61 2573.30 0.96 5963555.68 678593.47 N 70 18 21.098 W 148 33 11.032 8210.59 65.92 43.97 5961.07 6022.07 3929.77 3980.84 3936.83 2926.89 2632.86 0.42 5963618.34 678651.58 N 70 18 21.700 W 148 33 9.294 8303.68 66.06 43.13 5998.94 6059.94 4014.48 4065.87 4021.84 2988.52 2691.45 0.84 5963681.32 678708.70 N 70 18 22.306 W 148 33 7.585 8397.95 65.51 42.44 6037.61 6098.61 4100.22 4151.85 4107.80 3051.62 2749.85 0.89 5963745.77 678765.60 N 70 18 22.926 W 148 3111 8490.59 65.38 41.74 6076.11 6137.11 4184.32 4236.11 4192.06 3114.15 2806.33 0.70 5963809.60 678820.60 N 70 18 23.541 W 148 33 4.233 8584.52 65.53 39.71 6115.13 6176.13 4269.69 4321.55 4277.48 3178.90 2862.07 1.97 5963875.63 678874.80 N 70 18 24.178 W 148 33 2.607 8678.96 65.55 38.62 6154.24 6215.24 4355.65 4407.51 4363.34 3245.55 2916.36 1.05 5963943.53 678927.51 N 70 18 24.833 W 148 33 1.023 8776.77 65.64 38.11 6194.65 6255.65 4444.72 4496.58 4452.24 3315.38 2971.64 0.48 5964014.64 678981.14 N 70 18 25.520 W 148 32 59.410 8872.08 65.77 39.26 6233.87 6294.87 4531.59 4583.45 4538.97 3383.19 3025.94 1.11 5964083.69 679033.83 N 70 18 26.186 W 148 32 57.826 8966.07 65.72 40.92 6272.48 6333.48 4617.24 4669.15 4624.63 3448.75 3081.12 1.61 5964150.52 679087.46 N 70 18 26.831 W 148 32 56.216 9059.53 65.45 41.68 6311.11 6372.11 4702.25 4754.25 4709.72 3512.68 3137.29 0.79 5964215.75 679142.10 N 70 18 27.459 W 148 32 54.577 9153.43 65.49 41.05 6350.09 6411.09 4787.57 4839.67 4795.15 3576.79 3193.74 0.61 5964281.16 679197.04 N 70 18 28.090 W 148 32 52.930 9247.90 65.39 40.28 6389.36 6450.36 4873.43 4925.60 4881.05 3641.97 3249.73 0.75 5964347.63 679251.48 N 70 18 28.730 W 148 32 51.296 9343.13 65.39 39.26 6429.02 6490.02 4959.99 5012.17 4967.58 3708.51 3305.11 0.97 5964415.45 679305.29 N 70 18 29.385 W 148 32 49.680 9436.42 65.42 39.65 6467.85 6528.85 5044.80 5097.00 5052.34 3774.01 3359.02 0.38 5964482.18 679357.64 N 70 18 30.029 W 148 32 48.107 9531.09 65.49 39.44 6507.17 6568.17 5130.90 5183.11 5138.40 3840.42 3413.85 0.21 5964549.85 679410.89 N 70 18 30.681 W 148 32 46.507 9624.40 65.35 38.85 6545.99 6606.99 5215.75 5267.97 5223.17 3906.22 3467.41 0.59 5964616.89 679462.90 N 70 18 31.328 W 148 32 44.944 9718.66 65.40 38.86 6585.26 6646.26 5301.44 5353.66 5308.76 3972.95 3521.17 0.05 5964684.86 679515.07 N 70 18 31.984 W 148 32 43.375 9812.95 65.32 38.39 6624.57 6685.57 5387.14 5439.36 5394.36 4039.91 3574.67 0.46 5964753.04 679566.98 N 70 18 32.643 W 148 32 41.814 9908.17 65.45 39.06 6664.24 6725.24 5473.71 5525.93 5480.83 4107.44 3628.82 0.65 5964821.82 679619.54 N 70 18 33.307 W 148 32 40.234 10002.84 65.73 39.81 6703.36 6764.36 5559.91 5612.14 5566.98 4174.02 3683.58 0.78 5964889.66 679672.72 N 70 18 33.961 W 148 32 38.636 SurveyEditor Ver SP 2.1 Bid( users) 15- 16 \15- 16 \15- 16BPB1 \15- 16BPB1 Generated 5/6/2010 1:12 PM Page 3 of 5 Measured Azimuth Vertical Along Hole NS I EW Comments Inclination Sub-Sea TVD TVD Closure DLS Northing Easting Latitude Longitude Depth True Section Departure True North True North (ft ) (deg) (deg) (ft) (ft) (ft ) (ft ) (ft ) (ft) (ft) _ (deg1100ft) (ftUS) (ftUS) . 10097.24 66.79 41.45 6741.37 6802.37 5646.26 5698.55 5653.38 4239.60 3739.85 1.95 5964956.53 679727.43 N 70 18 34.606 W 148 32 36.994 10193.30 66.02 43.10 6779.82 6840.82 5734.09 5786.57 5741.39 4304.73 3799.06 1.77 5965023.03 679785.10 N 70 18 35.246 W 148 32 35.266 10286.68 65.22 45.46 6818.37 6879.37 5818.71 5871.62 5826.33 4365.62 3858.43 2.46 5965085.29 679843.02 N 70 18 35.845 W 148 32 33.533 10381.40 65.65 45.37 6857.75 6918.75 5904.24 5957.77 5912.28 4426.09 3919.79 0.46 5965147.18 679902.94 N 70 18 36.439 W 148 32 31.743 10476.11 65.93 45.43 6896.58 6957.58 5990.00 6044.15 5998.46 4486.75 3981.29 0.30 5965209.26 679963.00 N 70 18 37.035 W 148 32 29.948 10569.67 65.90 45.52 6934.77 6995.77 6074.79 6129.56 6083.69 4546.64 4042.19 0.09 5965270.56 680022.47 N 70 18 37.624 W 148 32 28.171 10664.13 65.90 45.38 6973.34 7034.34 6160.39 6215.79 6169.72 4607.13 4103.64 0.14 5965332.47 680082.48 N 70 18 38.219 W 148 32 26.377 10757.63 63.84 44.46 7013.04 7074.04 6244.51 6300.44 6254.23 4667.06 4163.41 2.38 5965393.78 680140.83 N 70 18 38.808 W 148 32 24.633 10853.14 60.04 43.42 7057.96 7118.96 6328.40 6384.70 6338.44 4727.73 4221.89 4.09 5965455.79 680197.87 N 70 18 39.404 W 148 32 22.926 10947.88 57.26 40.47 7107.25 7168.25 6409.14 6465.60 6419.33 4787.87 4275.98 3.96 5965517.18 680250.53 N 70 18 39.995 W 148 32 21.347 11039.80 53.73 39.27 7159.32 7220.32 6484.86 6541.34 6495.02 4845.99 4324.54 3.99 5965576.42 680297.72 N 70 18 40.566 W 148 320 11135.27 51.98 36.23 7216.97 7277.97 6560.93 6617.43 6570.92 4906.13 4371.14 3.13 5965637.63 680342.89 N 70 18 41.158 W 148 32 0 11228.64 51.31 33.78 7274.92 7335.92 6634.00 6690.64 6643.64 4966.09 4413.14 2.18 5965698.56 680383.47 N 70 18 41.747 W 148 32 17.343 11323.20 50.84 31.00 7334.34 7395.34 6707.13 6764.20 6716.25 5028.20 4452.55 2.34 5965761.56 680421.41 N 70 18 42.358 W 148 32 16.193 11417.12 49.15 29.95 7394.71 7455.71 6778.36 6836.14 6786.86 5090.19 4489.04 1.99 5965824.39 680456.43 N 70 18 42.967 W 148 32 15.127 11512.52 46.22 28.86 7458.93 7519.93 6848.00 6906.67 6855.87 5151.63 4523.68 3.19 5965886.62 680489.63 N 70 18 43.571 W 148 32 14.116 11607.94 43.19 28.33 7526.74 7587.74 6914.11 6973.79 6921.37 5210.56 4555.81 3.20 5965946.28 680520.37 N 70 18 44.151 W 148 32 13.178 11700.55 40.75 26.16 7595.59 7656.59 6974.83 7035.71 6981.49 5265.59 4584.18 3.07 5966001.96 680547.44 N 70 18 44.692 W 148 32 12.349 11795.50 37.26 20.32 7669.39 7730.39 7032.44 7095.43 7038.39 5320.40 4607.84 5.33 5966057.30 680569.81 N 70 18 45.231 W 148 32 11.658 11890.04 33.52 15.98 7746.46 7807.46 7083.76 7150.16 7088.91 5372.36 4624.98 4.76 5966109.65 680585.72 N 70 18 45.741 W 148 32 11.157 11984.92 34.83 15.02 7824.96 7885.96 7132.80 7203.45 7137.16 5423.72 4639.21 1.49 5966161.32 680598.74 N 70 18 46.246 W 148 32 10.741 12079.57 34.93 14.55 7902.61 7963.61 7182.34 7257.58 7185.94 5476.05 4653.02 0.30 5966213.96 680611.32 N 70 18 46.761 W 148 32 10.337 12173.85 35.46 17.28 7979.66 8040.66 7232.49 7311.91 7235.44 5528.29 4667.93 1.76 5966266.54 680625.00 N 70 18 47.275 W 148 32 9.901 12268.00 34.76 18.75 8056.68 8117.68 7283.20 7366.06 7285.61 5579.79 4684.67 1.17 5966318.40 680640.53 N 70 18 47.781 W 148 32 9.412 12335.13 34.68 17.99 8111.85 8172.85 7319.08 7404.29 7321.16 5616.07 4696.72 0.66 5966354.96 680651.72 N 70 18 48.138 W 148 32 9.060 12409.41 34.75 17.52 8172.91 8233.91 7358.63 7446.59 7360.36 5656.36 4709.62 0.37 5966395.54 680663.67 N 70 18 48.534 W 148 32 8.683 12439.21 34.56 17.51 8197.42 8258.42 7374.45 7463.54 7376.05 5672.52 4714.72 0.64 5966411.81 680668.39 N 70 18 48.693 W 148 32 8.534 12470.89 37.18 15.35 8223.09 8284.09 7391.64 7482.10 7393.09 5690.32 4719.96 9.18 5966429.73 680673.21 N 70 18 48.868 W 148 32 8.381 12503.45 40.47 13.47 8248.46 8309.46 7410.26 7502.51 7411.55 5710.09 4725.02 10.73 5966449.61 680677.82 N 70 18 49.062 W 148 32232 12534.30 39.83 12.73 8272.04 8333.04 7428.22 7522.40 7429.35 5729.47 4729.53 2.59 5966469.08 680681.87 N 70 18 49.253 W 148 3 0 12567.14 41.78 8.81 8296.90 8357.90 7447.20 7543.85 7448.16 5750.54 4733.53 9.80 5966490.24 680685.37 N 70 18 49.460 W 148 3 4 12598.01 45.60 7.12 8319.22 8380.22 7465.55 7565.17 7466.34 5771.66 4736.47 12.94 5966511.42 680687.82 N 70 18 49.668 W 148 32 7.897 12629.48 45.23 7.03 8341.31 8402.31 7484.66 7587.59 7485.29 5793.90 4739.23 1.19 5966533.72 680690.05 N 70 18 49.887 W 148 32 7.816 12661.36 47.37 4.19 8363.34 8424.34 7504.00 7610.63 7504.47 5816.83 4741.47 9.30 5966556.70 680691.76 N 70 18 50.112 W 148 32 7.751 12692.54 51.10 1.51 8383.69 8444.69 7523.16 7634.24 7523.49 5840.41 4742.63 13.62 5966580.30 680692.36 N 70 18 50.344 W 148 32 7.716 12723.54 50.73 1.56 8403.24 8464.24 7542.38 7658.30 7542.59 5864.46 4743.28 1.20 5966604.36 680692.45 N 70 18 50.581 W 148 32 7.697 12755.41 50.67 1.34 8423.42 8484.42 7562.05 7682.97 7562.16 5889.12 4743.90 0.57 5966629.02 680692.49 N 70 18 50.823 W 148 32 7.678 12787.08 53.01 1.18 8442.99 8503.99 7581.86 7707.87 7581.91 5914.01 4744.45 7.40 5966653.92 680692.45 N 70 18 51.068 W 148 32 7.662 12818.21 58.28 0.83 8460.55 8521.55 7602.23 7733.56 7602.24 5939.70 4744.90 16.95 5966679.60 680692.30 N 70 18 51.320 W 148 32 7.648 12850.06 59.27 1.28 8477.06 8538.06 7623.85 7760.79 7623.85 5966.93 4745.40 3.33 5966706.84 680692.16 N 70 18 51.588 W 148 32 7.633 12881.58 62.72 359.99 8492.34 8553.34 7645.59 7788.35 7645.62 5994.49 4745.70 11.52 5966734.40 680691.82 N 70 18 51.859 W 148 32 7.624 12912.00 66.73 359.42 8505.33 8566.33 7667.01 7815.86 7667.12 6021.99 4745.55 13.29 5966761.88 680691.03 N 70 18 52.130 W 148 32 7.628 12944.28 66.81 0.15 8518.06 8579.06 7690.14 7845.52 7690.37 6051.66 4745.44 2.09 5966791.53 680690.22 N 70 18 52.422 W 148 32 7.630 12974.95 65.09 359.94 8530.56 8591.56 7712.06 7873.53 7712.44 6079.66 4745.47 5.64 5966819.53 680689.59 N 70 18 52.697 W 148 32 7.629 13006.42 60.14 0.73 8545.03 8606.03 7734.01 7901.46 7734.58 6107.60 4745.62 15.89 5966847.46 680689.10 N 70 18 52.972 W 148 32 7.624 13038.44 58.31 359.88 8561.41 8622.41 7755.62 7928.97 7756.41 6135.10 4745.77 6.15 5966874.96 680688.60 N 70 18 53.242 W 148 32 7.619 13069.60 54.67 1.67 8578.61 8639.61 7776.15 7954.95 7777.18 6161.08 4746.12 12.63 5966900.93 680688.33 N 70 18 53.498 W 148 32 7.609 SurveyEditor Ver SP 2.1 Bld( users) 15- 16 \15- 16 \15- 16BPB1 \15- 16BPB1 Generated 5/6/2010 1:12 PM Page 4 of 5 Measured Azimuth Vertical Along Hole NS EW Comments Inclination Sub•Sea TVD TVD Closure DLS Northing Easting Latitude Longitude Depth True Section Departure True North True North (ft) (deg) _ (deg) (ft ) (ft) (ft) (ft) (ft ) (ft ) (ft) (deg /100ft) (ftUS) (ftUS) 13099.32 51.45 2.30 8596.47 8657.47 7795.23 7978.70 7796.49 6184.81 4746.94 10.97 5966924.68 680688.60 N 70 18 53.731 W 148 32 7.584 13132.78 49.97 1.57 8617.66 8678.66 7816.02 8004.59 7817.57 6210.69 4747.81 4.73 5966950.57 680688.87 N 70 18 53.986 W 148 32 7.558 13164.68 45.14 3.40 8639.18 8700.18 7835.03 8028.12 7836.87 6234.20 4748.82 15.72 5966974.10 680689.32 N 70 18 54.217 W 148 32 7.529 Last Survey 13190.38 42.73 4.66 8657.69 8718.69 7849.72 8045.95 7851.78 6251.99 4750.07 9.97 5966991.91 680690.15 N 70 18 54.392 W 148 32 7.492 TD (Projected) 13240.00 42.73 4.66 8694.14 8755.14 7877.67 8079.62 7880.18 6285.55 4752.80 0.00 5967025.52 680692.10 N 70 18 54.722 W 148 32 7.411 Survey Error Model: SLB ISCWSA version 24 * ** 3 -D 95.00% Confidence 2.7955 sigma Surveying Proq: MD From ( ft 1 MD To ( ft 1 EOU Freq Survey Tool Type Borehole -> Survey 0.00 30.00 Act -Stns SLB_ZERO -Depth Only 15 -16 -> 15 -16 30.00 4540.00 Act -Stns SLB_CNSG +CASING 15 -16 -> 15 -16 4540.00 4604.00 Act -Stns SLB_BLIND 15- 16BPB1 -> 15- 16BPB1 4604.00 4720.47 Act -Stns SLB_INC +TREND 15- 16BPB1 -> 15- 16BPB1 4720.47 13190.38 Act -Stns SLB_MWD +GMAG 15- 16BPB1 -> 15- 16BPB1 • 13190.38 13240.00 Act -Stns SLB_ZERO 15- 16BPB1 -> 15- 16BPB1 Legal Description: Northing (Y) (ftUS( Eastina (X) fftUS1 Surface : 4426 FSL 5115 FEL S22 T11N R14E UM 5960630.76 676088.19 BHL : 150 FSL 349 FEL S10 T11N R14E UM 5967025.52 680692.10 *Italicized stations are NOT used in position calculations. Final Definitive Survey Verify and Sign -off I have checked to the best of my ability that the following data is correct: Surface Coordinates and Reference Elevations Declination Information Survey Tool Codes SLB DE: Client Representative: Date: • I I SurveyEditor Ver SP 2.1 Bld( users) 15- 16 \15- 16 \15- 16BPB1 \15- 16BPB1 Generated 5/6/2010 1:12 PM Page 5 of 5 by - 0 DS15 -16B Survey Report $cblumberger Report Date: 4- Apr -10 Survey 1 DLS Computation Method: Minimum Curvature / Lubinski Client: BP Exploration Alaska Vertical Section Azimuth: 38.540° Field: Prudhoe Bay Unit- EOA Vertical Section Origin: N 0.000 ft, E 0.000 ft Structure 1 Slot: DS -15 / 15 -16 ND Reference Datum: Rotary Table Well: 15 -16 TVD Reference Elevation: 61.00 ft relative to MSL Borehole: 15 -166 Sea Bed 1 Ground Level Elevation: 32.80 ft relative to MSL UWIIAPI #: 500292111502 Magnetic Declination: 22.299 Survey Name 1 Date: 15 -16B / April 4, 2010 Total Field Strength: 57690.259 nT Tort 1 AHD I DDI I ERD ratio: 368.628° / 10518.15 ft / 6.843 / 1.210 Magnetic Dip: 80.946 Grid Coordinate System: NAD27 Alaska State Planes, Zone 04, US Feet Declination Date: April 02, 2010 Location Lat!Long: N 7017 52.919, W 148 34 26.072 Magnetic Declination Model: BGGM 2009 Location Grid NIE YIX: N 5960630.760 ftUS, E 676088.190 ftUS North Reference: True North Grid Convergence Angle: +1.34263779° Total Corr Mag North -> True North: +22.299° Grid Scale Factor: 0.99993522 Local Coordinates Referenced To: Well Head Measured Azimuth Vertical Along Hole NS EW Comments Inclination Sub -Sea ND ND Closure DLS Northing Easting Latitude Longitude Depth True Section Departure True North True North P P (ft) I (deg) (deg) (ft) (ft) (ft) _ (ft) I (ft) (ft) (ft) (deg /100ft) _ (ftUS) (ftUS) Projected -Up 0.00 0.00 0.00 -61.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 5960630.76 676088.19 N 70 17 52.919 W 148 34 26.072 WRP 30.00 0.00 0.00 -31.00 30.00 0.00 0.00 0.00 0.00 0.00 0.00 5960630.76 676088.19 N 70 17 52.919 W 148 34 26.072 GYRODATA 2/18/99 AK0299GCE523 90.00 0.37 179.86 29.00 90.00 -0.15 0.19 0.19 -0.19 0.00 0.62 5960630.57 676088.20 N 70 17 52.917 W 148 34 26.072 GYRO 190.00 0.43 158.08 129.00 190.00 -0.59 0.88 0.88 -0.86 0.14 0.16 5960629.90 676088.35 N 70 17 52.910 W 148 34 26.068 290.00 0.36 180.27 228.99 289.99 -1.02 1.56 1.55 -1.53 0.28 0.17 5960629.24 676088.51 N 70 17 52.904 W 148 34 26.064 390.00 0.51 168.24 328.99 389.99 -1.55 2.32 2.31 -2.28 0.37 0.17 5960628.49 676088.61 N 70 17 52.896 W 148 34 26.061 490.00 0.43 179.07 428.99 489.99 -2.12 3.14 3.12 -3.09 0.47 0.12 5960627.68 676088.73 N 70 17 52.889 W 148 34 26.059 590.00 0.49 164.12 528.99 589.99 -2.66 3.94 3.92 -3.87 0.59 0.13 5960626.90 676088.87 N 70 17 52.881 W 148 34 26.055 690.00 0.41 178.64 628.98 689.98 -3.19 4.72 4.70 -4.64 0.71 0.14 5960626.14 676089.01 N 70 17 52.873 W 148 34 1 790.00 0.12 121.30 728.98 789.98 -3.45 5.15 5.12 -5.06 0.81 0.36 5960625.73 676089.12 N 70 17 52.869 W 148 34 9 890.00 0.37 81.65 828.98 889.98 -3.20 5.57 5.21 -5.06 1.22 0.29 5960625.73 676089.53 N 70 17 52.869 W 148 34 26.037 990.00 0.43 85.77 928.98 989.98 -2.71 6.27 5.34 -4.99 1.92 0.07 5960625.82 676090.22 N 70 17 52.870 W 148 34 26.016 1090.00 0.32 93.93 1028.98 1089.98 -2.30 6.92 5.60 -4.98 2.57 0.12 5960625.84 676090.87 N 70 17 52.870 W 148 34 25.997 1190.00 0.30 72.48 1128.97 1189.97 -1.92 7.45 5.81 -4.92 3.10 0.12 5960625.91 676091.40 N 70 17 52.870 W 148 34 25.982 1290.00 0.40 81.01 1228.97 1289.97 -1.44 8.06 6.04 -4.79 3.69 0.11 5960626.06 676091.99 N 70 17 52.872 W 148 34 25.965 1 390.00 0.40 115.46 1328.97 1389.97 -1.11 8.74 6.54 -4.88 4.35 0.24 5960625.98 676092.65 N 70 17 52.871 W 148 34 25.945 1490.00 0.31 96.64 1428.97 1489.97 -0.89 9.35 7.07 -5.06 4.93 0.15 5960625.81 676093.24 N 70 17 52.869 W 148 34 25.928 1590.00 0.46 131.91 1528.97 1589.97 -0.77 10.01 7.68 -5.36 5.50 0.27 5960625.53 676093.82 N 70 17 52.866 W 148 34 25.912 1690.00 0.41 126.75 1628.96 1689.96 -0.78 10.77 8.44 -5.85 6.09 0.06 5960625.06 676094.41 N 70 17 52.861 W 148 34 25.895 1790.00 0.28 164.95 1728.96 1789.96 -0.91 11.35 9.00 -6.30 6.44 0.26 5960624.62 676094.77 N 70 17 52.857 W 148 34 25.885 1890.00 0.34 163.56 1828.96 1889.96 -1.23 11.89 9.48 -6.82 6.58 0.06 5960624.10 676094.93 N 70 17 52.852 W 148 34 25.880 1990.00 0.53 67.10 1928.96 1989.96 -0.99 12.49 9.91 -6.92 7.09 0.66 5960624.01 676095.44 N 70 17 52.851 W 148 34 25.865 2090.00 0.64 69.28 2028.95 2089.95 -0.11 13.51 10.37 -6.54 8.04 0.11 5960624.41 676096.38 N 70 17 52.855 W 148 34 25.838 2190.00 0.60 82.25 2128.95 2189.95 0.75 14.59 11.04 -6.27 9.08 0.15 5960624.70 676097.42 N 70 17 52.857 W 148 34 25.807 2290.00 0.86 153.02 2228.94 2289.94 0.82 15.71 12.09 -6.87 9.94 0.87 5960624.12 676098.29 N 70 17 52.851 W 148 34 25.782 2390.00 0.96 160.89 2328.93 2389.93 0.06 17.30 13.45 -8.33 10.56 0.16 5960622.68 676098.94 N 70 17 52.837 W 148 34 25.764 13 -3/8" Csg 2485.00 0.89 153.98 2423.92 2484.92 -0.68 18.83 14.81 -9.75 11.14 0.14 5960621.27 676099.56 N 70 17 52.823 W 148 34 25.747 SurveyEditor Ver SP 2.1 Bld( users) 15- 16 \15- 16 \15- 16B \15 -16B Generated 5/6/2010 1:12 PM Page 1 of 7 Measured Azimuth Vertical Along Hole NS EW Comments Inclination Sub-Sea TVD TVD Closure DLS Northing Easting Latitude Longitude Depth True Section Departure True North True North (ft) I (deg) (deg) (ft ) (ft ) (ft) (ft) (ft ) (ft) (ft) (deg1100ft ) (ftUS) (ftUS) 2490.00 0.89 153.59 2428.92 2489.92 -0.72 18.91 14.88 -9.82 11.18 0.14 5960621.21 676099.59 N 70 17 52.822 W 148 34 25.746 2590.00 1.43 24.44 2528.90 2589.90 0.17 20.27 15.26 -9.38 12.04 2.11 5960621.67 676100.45 N 70 17 52.827 W 148 34 25.721 2690.00 4.99 19.36 2628.73 2689.73 5.48 25.86 14.60 -4.14 14.00 3.57 5960626.95 676102.28 N 70 17 52.878 W 148 34 25.664 2790.00 6.55 12.61 2728.22 2789.22 14.72 35.90 17.58 5.53 16.69 1.70 5960636.68 676104.74 N 70 17 52.973 W 148 34 25.586 2890.00 8.25 7.65 2827.39 2888.39 26.01 48.78 26.23 18.21 18.89 1.81 5960649.40 676106.64 N 70 17 53.098 W 148 34 25.522 2990.00 9.99 13.86 2926.12 2987.12 40.05 64.61 40.24 33.74 21.92 2.00 5960665.00 676109.31 N 70 17 53.251 W 148 34 25.433 3090.00 11.39 28.91 3024.40 3085.40 57.67 83.06 58.39 50.81 28.77 3.11 5960682.23 676115.76 N 70 17 53.419 W 148 34 25.234 3190.00 12.85 35.21 3122.18 3183.18 78.51 104.03 79.34 68.54 39.96 1.97 5960700.22 676126.53 N 70 17 53.593 W 148 34 24.907 3290.00 13.38 25.23 3219.58 3280.58 100.87 126.67 101.95 88.10 51.30 2.32 5960720.03 676137.41 N 70 17 53.785 W 148 34 77 3340.00 14.04 24.08 3268.16 3329.16 112.38 138.52 113.75 98.87 56.24 1.43 5960730.91 676142.10 N 70 17 53.891 W 148 34 3 3390.00 14.79 23.96 3316.58 3377.58 124.42 150.96 126.14 110.24 61.31 1.50 5960742.40 676146.90 N 70 17 54.003 W 148 34 85 3440.00 15.54 24.87 3364.84 3425.84 137.11 164.04 139.18 122.15 66.72 1.57 5960754.43 676152.02 N 70 17 54.120 W 148 34 24.127 3490.00 16.40 26.22 3412.91 3473.91 150.51 177.80 152.92 134.56 72.65 1.87 5960766.97 676157.67 N 70 17 54.242 W 148 34 23.954 3540.00 17.20 27.38 3460.78 3521.78 164.66 192.25 167.36 147.45 79.17 1.73 5960780.02 676163.88 N 70 17 54.369 W 148 34 23.764 3590.00 18.81 29.52 3508.33 3569.33 179.88 207.70 182.82 161.03 86.55 3.48 5960793.77 676170.93 N 70 17 54.503 W 148 34 23.549 3640.00 20.34 30.37 3555.43 3616.43 196.44 224.46 199.56 175.54 94.91 3.11 5960808.47 676178.96 N 70 17 54.645 W 148 34 23.306 3690.00 21.45 31.12 3602.15 3663.15 214.11 242.29 217.38 190.87 104.03 2.28 5960824.00 676187.71 N 70 17 54.796 W 148 34 23.040 3740.00 22.83 31.56 3648.46 3709.46 232.80 261.13 236.20 206.96 113.83 2.78 5960840.32 676197.13 N 70 17 54.954 W 148 34 22.754 3790.00 24.12 31.76 3694.32 3755.32 252.58 281.05 256.10 223.91 124.29 2.58 5960857.51 676207.19 N 70 17 55.121 W 148 34 22.449 3840.00 25.64 31.75 3739.68 3800.68 273.47 302.08 277.11 241.80 135.36 3.04 5960875.65 676217.84 N 70 17 55.297 W 148 34 22.126 3890.00 27.86 31.39 3784.32 3845.32 295.80 324.59 299.60 260.98 147.14 4.45 5960895.09 676229.16 N 70 17 55.486 W 148 34 21.783 3940.00 29.43 31.59 3828.20 3889.20 319.59 348.55 323.55 281.41 159.66 3.15 5960915.82 676241.20 N 70 17 55.687 W 148 34 21.418 3990.00 31.04 31.61 3871.40 3932.40 344.58 373.73 348.71 302.86 172.85 3.22 5960937.56 676253.88 N 70 17 55.897 W 148 34 21.033 4040.00 32.33 31.79 3913.95 3974.95 370.66 399.99 374.96 325.20 186.65 2.59 5960960.22 676267.16 N 70 17 56.117 W 148 34 20.631 4090.00 33.53 32.30 3955.91 4016.91 397.66 427.17 402.12 348.24 201.07 2.46 5960983.59 676281.04 N 70 17 56.344 W 148 34 20.211 4140.00 34.98 32.84 3997.24 4058.24 425.65 455.32 430.24 371.95 216.23 2.96 5961007.65 676295.63 N 70 17 56.577 W 148 34 19.769 4190.00 36.31 33.17 4037.87 4098.87 454.66 484.45 459.34 396.39 232.10 2.69 5961032.45 676310.92 N 70 17 56.817 W 148 34 19.306 4240.00 38.51 33.62 4077.58 4138.58 484.91 514.83 489.67 421.75 248.82 4.43 5961058.19 676327.04 N 70 17 57.067 W 148 34 19 4290.00 40.39 33.70 4116.19 4177.19 516.56 546.60 521.40 448.19 266.43 3.76 5961085.04 676344.03 N 70 17 57.327 W 148 34 05 4340.00 42.01 33.81 4153.81 4214.81 549.38 579.53 554.29 475.57 284.73 3.24 5961112.84 676361.68 N 70 17 57.596 W 148 34 17.772 4390.00 43.50 33.74 4190.52 4251.52 583.20 613.47 588.19 503.78 303.60 2.98 5961141.48 676379.88 N 70 17 57.873 W 148 34 17.222 4440.00 44.46 33.81 4226.50 4287.50 617.80 648.19 622.87 532.64 322.90 1.92 5961170.79 676398.50 N 70 17 58.157 W 148 34 16.659 4490.00 45.45 33.90 4261.88 4322.88 653.01 683.52 658.17 561.98 342.58 1.98 5961200.57 676417.48 N 70 17 58.446 W 148 34 16.085 Tie -In Survey 4540.00 47.24 34.25 4296.40 4357.40 689.08 719.69 694.30 591.94 362.85 3.62 5961231.00 676437.04 N 70 17 58.740 W 148 34 15.494 TOW (Blind) 4587.00 49.09 34.55 4327.74 4388.74 724.00 754.71 729.27 620.83 382.63 3.96 5961260.35 676456.15 N 70 17 59.025 W 148 34 14.918 BOW 4604.00 49.90 37.00 4338.79 4399.79 736.91 767.63 742.17 631.32 390.19 11.95 5961271.00 676463.45 N 70 17 59.128 W 148 34 14.697 Inc +Trend 4626.54 49.22 38.00 4353.41 4414.41 754.06 784.79 759.23 644.93 400.63 4.53 5961284.85 676473.57 N 70 17 59.262 W 148 34 14.393 4720.47 51.78 43.80 4413.18 4474.18 826.42 857.24 830.82 699.62 448.10 5.49 5961340.64 676519.74 N 70 17 59.799 W 148 34 13.009 MWD +GMAG 4813.93 56.37 48.05 4468.02 4529.02 901.41 932.89 904.58 752.17 502.49 6.14 5961394.45 676572.89 N 70 18 0.316 W 148 34 11.423 4906.86 59.65 44.78 4517.25 4578.25 979.46 1011.69 981.61 806.52 559.53 4.62 5961450.12 676628.64 N 70 18 0.851 W 148 34 9.760 5003.33 62.85 48.04 4563.66 4624.66 1063.21 1096.25 1064.54 864.79 620.80 4.45 5961509.80 676688.51 N 70 18 1.424 W 148 34 7.974 5096.00 65.42 41.60 4604.11 4665.11 1146.04 1179.61 1146.89 923.93 679.49 6.84 5961570.29 676745.80 N 70 18 2.005 W 148 34 6.263 5193.19 66.05 41.60 4644.06 4705.06 1234.51 1268.22 1235.14 990.19 738.32 0.65 5961637.91 676803.06 N 70 18 2.657 W 148 34 4.547 5286.33 66.86 41.77 4681.26 4742.26 1319.77 1353.60 1320.23 1053.95 795.10 0.89 5961702.98 676858.33 N 70 18 3.284 W 148 34 2.892 5378.55 66.00 40.77 4718.14 4779.14 1404.20 1438.13 1404.53 1117.48 850.86 1.36 5961767.79 676912.57 N 70 18 3.909 W 148 34 1.266 5472.62 64.46 39.04 4757.55 4818.55 1489.58 1523.54 1489.86 1182.99 905.65 2.34 5961834.57 676965.82 N 70 18 4.553 W 148 33 59.668 5570.80 65.40 38.90 4799.15 4860.15 1578.51 1612.47 1578.76 1252.13 961.58 0.97 5961904.99 677020.11 N 70 18 5.233 W 148 33 58.037 SurveyEditor Ver SP 2.1 Bid( users) 15- 16 \15- 16 \15- 16B \15 -16B Generated 5/6/2010 1:12 PM Page 2 of 7 Measured Azimuth Vertical Along Hole NS EW Comments Depth Inclination True Sub•Sea TVD TVD Section Departure Closure True North True North DLS Northing Easting Latitude Longitude (ft ) (deg) (deg) (ft ) (ft) _ (ft) (ft) (ft ) (ft ) (ft) (deg /100ft ) (ftUS) (ftUS) 5666.46 63.33 38.54 4840.54 4901.54 1664.75 1698.71 1664.98 1319.42 1015.53 2.19 5961973.52 677072.46 N 70 18 5.895 W 148 33 56.464 5757.98 63.20 38.03 4881.71 4942.71 1746.48 1780.44 1746.71 1383.57 1066.17 0.52 5962038.84 677121.58 N 70 18 6.525 W 148 33 54.988 5852.93 63.06 39.82 4924.63 4985.63 1831.17 1865.14 1831.38 1449.46 1119.38 1.69 5962105.95 677173.23 N 70 18 7.173 W 148 33 53.436 5947.04 63.90 43.51 4966.66 5027.66 1915.24 1949.34 1915.37 1512.35 1175.36 3.62 5962170.13 677227.71 N 70 18 7.792 W 148 33 51.804 6041.27 64.55 44.66 5007.63 5068.63 1999.69 2034.19 1999.75 1573.30 1234.39 1.30 5962232.44 677285.30 N 70 18 8.391 W 148 33 50.082 6136.26 64.38 47.07 5048.59 5109.59 2084.69 2119.90 2084.70 1632.98 1295.90 2.30 5962293.54 677345.39 N 70 18 8.978 W 148 33 48.288 6230.93 65.05 46.45 5089.02 5150.02 2169.41 2205.50 2169.43 1691.62 1358.26 0.92 5962353.62 677406.35 N 70 18 9.555 W 148 33 46.470 6259.71 65.49 46.48 5101.06 5162.06 2195.30 2231.64 2195.34 1709.62 1377.21 1.53 5962372.07 677424.87 N 70 18 9.732 W 148 33 45.917 6318.80 67.15 45.22 5124.79 5185.79 2248.98 2285.76 2249.06 1747.32 1416.03 3.42 5962410.66 677462.80 N 70 18 10.102 W 148 33 85 6368.92 63.86 46.23 5145.57 5206.57 2294.22 2331.36 2294.35 1779.15 1448.68 6.82 5962443.25 677494.69 N 70 18 10.415 W 148 33 3 6410.76 61.23 46.69 5164.86 5225.86 2330.99 2368.48 2331.18 1804.73 1475.59 6.36 5962469.45 677520.99 N 70 18 10.667 W 148 33 48 6504.67 61.20 47.28 5210.08 5271.08 2412.40 2450.79 2412.77 1860.88 1535.77 0.55 5962526.98 677579.83 N 70 18 11.219 W 148 33 41.293 6596.18 61.28 48.08 5254.11 5315.11 2491.61 2531.01 2492.20 1914.89 1595.08 0.77 5962582.37 677637.86 N 70 18 11.750 W 148 33 39.564 6699.05 61.46 47.28 5303.40 5364.40 2580.75 2621.30 2581.67 1975.68 1661.84 0.70 5962644.70 677703.18 N 70 18 12.348 W 148 33 37.617 6796.68 61.11 47.94 5350.31 5411.31 2665.30 2706.93 2666.58 2033.40 1725.08 0.69 5962703.89 677765.04 N 70 18 12.915 W 148 33 35.772 6886.49 61.53 47.54 5393.41 5454.41 2743.08 2785.72 2744.73 2086.39 1783.39 0.61 5962758.22 677822.09 N 70 18 13.436 W 148 33 34.072 6980.91 60.83 46.42 5438.93 5499.93 2824.91 2868.44 2826.94 2142.83 1843.88 1.28 5962816.06 677881.23 N 70 18 13.991 W 148 33 32.308 7075.82 62.24 46.48 5484.16 5545.16 2907.55 2951.87 2909.97 2200.31 1904.35 1.49 5962874.94 677940.33 N 70 18 14.556 W 148 33 30.544 7170.28 61.35 44.92 5528.81 5589.81 2990.14 3035.12 2992.92 2258.44 1963.92 1.73 5962934.45 677998.53 N 70 18 15.128 W 148 33 28.806 7264.26 61.13 43.53 5574.03 5635.03 3072.12 3117.50 3075.18 2317.48 2021.39 1.32 5962994.81 678054.59 N 70 18 15.708 W 148 33 27.130 7357.92 64.10 44.99 5617.10 5678.10 3154.85 3200.66 3158.20 2377.02 2079.43 3.46 5963055.69 678111.22 N 70 18 16.294 W 148 33 25.437 7453.73 66.20 45.16 5657.37 5718.37 3241.22 3287.59 3244.94 2438.41 2140.98 2.20 5963118.50 678171.31 N 70 18 16.897 W 148 33 23.642 7548.68 66.40 45.16 5695.53 5756.53 3327.58 3374.53 3331.69 2499.72 2202.63 0.21 5963181.23 678231.50 N 70 18 17.500 W 148 33 21.844 7643.91 66.66 45.51 5733.46 5794.46 3414.32 3461.88 3418.84 2561.12 2264.76 0.43 5963244.07 678292.17 N 70 18 18.104 W 148 33 20.032 7734.70 66.23 45.30 5769.74 5830.74 3496.95 3545.11 3501.87 2619.55 2324.02 0.52 5963303.87 678350.04 N 70 18 18.678 W 148 33 18.303 7829.73 66.95 45.54 5807.50 5868.50 3583.53 3632.32 3588.89 2680.76 2386.14 0.79 5963366.51 678410.70 N 70 18 19.280 W 148 33 16.491 7924.91 66.18 45.79 5845.35 5906.35 3670.18 3719.64 3676.01 2741.79 2448.60 0.84 5963428.99 678471.71 N 70 18 19.880 W 148 33 69 8022.53 66.32 45.30 5884.67 5945.67 3758.87 3809.00 3765.17 2804.37 2512.38 0.48 5963493.04 678534.00 N 70 18 20.495 W 148 33 9 8116.99 65.94 44.40 5922.89 5983.89 3844.72 3895.38 3851.44 2865.61 2573.30 0.96 5963555.68 678593.47 N 70 18 21.098 W 148 33 2 8210.59 65.92 43.97 5961.07 6022.07 3929.77 3980.84 3936.83 2926.89 2632.86 0.42 5963618.34 678651.58 N 70 18 21.700 W 148 33 9.294 8303.68 66.06 43.13 5998.94 6059.94 4014.48 4065.87 4021.84 2988.52 2691.45 0.84 5963681.32 678708.70 N 70 18 22.306 W 148 33 7.585 8397.95 65.51 42.44 6037.61 6098.61 4100.22 4151.85 4107.80 3051.62 2749.85 0.89 5963745.77 678765.60 N 70 18 22.926 W 148 33 5.881 8490.59 65.38 41.74 6076.11 6137.11 4184.32 4236.11 4192.06 3114.15 2806.33 0.70 5963809.60 678820.60 N 70 18 23.541 W 148 33 4.233 8584.52 65.53 39.71 6115.13 6176.13 4269.69 4321.55 4277.48 3178.90 2862.07 1.97 5963875.63 678874.80 N 70 18 24.178 W 148 33 2.607 8678.96 65.55 38.62 6154.24 6215.24 4355.65 4407.51 4363.34 3245.55 2916.36 1.05 5963943.53 678927.51 N 70 18 24.833 W 148 33 1.023 8776.77 65.64 38.11 6194.65 6255.65 4444.72 4496.58 4452.24 3315.38 2971.64 0.48 5964014.64 678981.14 N 70 18 25.520 W 148 32 59.410 8872.08 65.77 39.26 6233.87 6294.87 4531.59 4583.45 4538.97 3383.19 3025.94 1.11 5964083.69 679033.83 N 70 18 26.186 W 148 32 57.826 8966.07 65.72 40.92 6272.48 6333.48 4617.24 4669.15 4624.63 3448.75 3081.12 1.61 5964150.52 679087.46 N 70 18 26.831 W 148 32 56.216 9059.53 65.45 41.68 6311.11 6372.11 4702.25 4754.25 4709.72 3512.68 3137.29 0.79 5964215.75 679142.10 N 70 18 27.459 W 148 32 54.577 9153.43 65.49 41.05 6350.09 6411.09 4787.57 4839.67 4795.15 3576.79 3193.74 0.61 5964281.16 679197.04 N 70 18 28.090 W 148 32 52.930 9247.90 65.39 40.28 6389.36 6450.36 4873.43 4925.60 4881.05 3641.97 3249.73 0.75 5964347.63 679251.48 N 70 18 28.730 W 148 32 51.296 9343.13 65.39 39.26 6429.02 6490.02 4959.99 5012.17 4967.58 3708.51 3305.11 0.97 5964415.45 679305.29 N 70 18 29.385 W 148 32 49.680 9436.42 65.42 39.65 6467.85 6528.85 5044.80 5097.00 5052.34 3774.01 3359.02 0.38 5964482.18 679357.64 N 70 18 30.029 W 148 32 48.107 9531.09 65.49 39.44 6507.17 6568.17 5130.90 5183.11 5138.40 3840.42 3413.85 0.21 5964549.85 679410.89 N 70 18 30.681 W 148 32 46.507 9624.40 65.35 38.85 6545.99 6606.99 5215.75 5267.97 5223.17 3906.22 3467.41 0.59 5964616.89 679462.90 N 70 18 31.328 W 148 32 44.944 9718.66 65.40 38.86 6585.26 6646.26 5301.44 5353.66 5308.76 3972.95 3521.17 0.05 5964684.86 679515.07 N 70 18 31.984 W 148 32 43.375 SurveyEditor Ver SP 2.1 Bld( users) 15- 16 \15- 16 \15- 16B \15 -16B Generated 5/6/2010 1:12 PM Page 3 of 7 Measured Azimuth Vertical Along Hole NS EW Comments Inclination Sub•Sea TVD TVD Closure DLS Northing Easting Latitude Longitude Depth True Section Departure True North True North _ (ft ) (deg) _ (deg) (ft) (ft ) (ft ) (ft) _ (ft) (ft ) (ft ) (deg1100ft ) (ftUS) (ftUS) 9812.95 65.32 38.39 6624.57 6685.57 5387.14 5439.36 5394.36 4039.91 3574.67 0.46 5964753.04 679566.98 N 70 18 32.643 W 148 32 41.814 9908.17 65.45 39.06 6664.24 6725.24 5473.71 5525.93 5480.83 4107.44 3628.82 0.65 5964821.82 679619.54 N 70 18 33.307 W 148 32 40.234 10002.84 65.73 39.81 6703.36 6764.36 5559.91 5612.14 5566.98 4174.02 3683.58 0.78 5964889.66 679672.72 N 70 18 33.961 W 148 32 38.636 10097.24 66.79 41.45 6741.37 6802.37 5646.26 5698.55 5653.38 4239.60 3739.85 1.95 5964956.53 679727.43 N 70 18 34.606 W 148 32 36.994 10193.30 66.02 43.10 6779.82 6840.82 5734.09 5786.57 5741.39 4304.73 3799.06 1.77 5965023.03 679785.10 N 70 18 35.246 W 148 32 35.266 10286.68 65.22 45.46 6818.37 6879.37 5818.71 5871.62 5826.33 4365.62 3858.43 2.46 5965085.29 679843.02 N 70 18 35.845 W 148 32 33.533 10381.40 65.65 45.37 6857.75 6918.75 5904.24 5957.77 5912.28 4426.09 3919.79 0.46 5965147.18 679902.94 N 70 18 36.439 W 148 32 31.743 10476.11 65.93 45.43 6896.58 6957.58 5990.00 6044.15 5998.46 4486.75 3981.29 0.30 5965209.26 679963.00 N 70 18 37.035 W 148 32 29.948 10569.67 65.90 45.52 6934.77 6995.77 6074.79 6129.56 6083.69 4546.64 4042.19 0.09 5965270.56 680022.47 N 70 18 37.624 W 148 32 28.171 10664.13 65.90 45.38 6973.34 7034.34 6160.39 6215.79 6169.72 4607.13 4103.64 0.14 5965332.47 680082.48 N 70 18 38.219 W 148 32 77 10757.63 63.84 44.46 7013.04 7074.04 6244.51 6300.44 6254.23 4667.06 4163.41 2.38 5965393.78 680140.83 N 70 18 38.808 W 148 32 33 10853.14 60.04 43.42 7057.96 7118.96 6328.40 6384.70 6338.44 4727.73 4221.89 4.09 5965455.79 680197.87 N 70 18 39.404 W 148 32 22.926 10947.88 57.26 40.47 7107.25 7168.25 6409.14 6465.60 6419.33 4787.87 4275.98 3.96 5965517.18 680250.53 N 70 18 39.995 W 148 32 21.347 11039.80 53.73 39.27 7159.32 7220.32 6484.86 6541.34 6495.02 4845.99 4324.54 3.99 5965576.42 680297.72 N 70 18 40.566 W 148 32 19.930 11135.27 51.98 36.23 7216.97 7277.97 6560.93 6617.43 6570.92 4906.13 4371.14 3.13 5965637.63 680342.89 N 70 18 41.158 W 148 32 18.570 11228.64 51.31 33.78 7274.92 7335.92 6634.00 6690.64 6643.64 4966.09 4413.14 2.18 5965698.56 680383.47 N 70 18 41.747 W 148 32 17.343 11323.20 50.84 31.00 7334.34 7395.34 6707.13 6764.20 6716.25 5028.20 4452.55 2.34 5965761.56 680421.41 N 70 18 42.358 W 148 32 16.193 11417.12 49.15 29.95 7394.71 7455.71 6778.36 6836.14 6786.86 5090.19 4489.04 1.99 5965824.39 680456.43 N 70 18 42.967 W 148 32 15.127 11512.52 46.22 28.86 7458.93 7519.93 6848.00 6906.67 6855.87 5151.63 4523.68 3.19 5965886.62 680489.63 N 70 18 43.571 W 148 32 14.116 11607.94 43.19 28.33 7526.74 7587.74 6914.11 6973.79 6921.37 5210.56 4555.81 3.20 5965946.28 680520.37 N 70 18 44.151 W 148 32 13.178 11700.55 40.75 26.16 7595.59 7656.59 6974.83 7035.71 6981.49 5265.59 4584.18 3.07 5966001.96 680547.44 N 70 18 44.692 W 148 32 12.349 11795.50 37.26 20.32 7669.39 7730.39 7032.44 7095.43 7038.39 5320.40 4607.84 5.33 5966057.30 680569.81 N 70 18 45.231 W 148 32 11.658 11890.04 33.52 15.98 7746.46 7807.46 7083.76 7150.16 7088.91 5372.36 4624.98 4.76 5966109.65 680585.72 N 70 18 45.741 W 148 32 11.157 11984.92 34.83 15.02 7824.96 7885.96 7132.80 7203.45 7137.16 5423.72 4639.21 1.49 5966161.32 680598.74 N 70 18 46.246 W 148 32 10.741 12079.57 34.93 14.55 7902.61 7963.61 7182.34 7257.58 7185.94 5476.05 4653.02 0.30 5966213.96 680611.32 N 70 18 46.761 W 148 32 10.337 12173.85 35.46 17.28 7979.66 8040.66 7232.49 7311.91 7235.44 5528.29 4667.93 1.76 5966266.54 680625.00 N 70 18 47.275 W 148 32 9.901 12268.00 34.76 18.75 8056.68 8117.68 7283.20 7366.06 7285.61 5579.79 4684.67 1.17 5966318.40 680640.53 N 70 18 47.781 W 148 32 9.412 12335.13 34.68 17.99 8111.85 8172.85 7319.08 7404.29 7321.16 5616.07 4696.72 0.66 5966354.96 680651.72 N 70 18 48.138 W 148 32 60 12409.41 34.75 17.52 8172.91 8233.91 7358.63 7446.59 7360.36 5656.36 4709.62 0.37 5966395.54 680663.67 N 70 18 48.534 W 148 3 3 12439.21 34.56 17.51 8197.42 8258.42 7374.45 7463.54 7376.05 5672.52 4714.72 0.64 5966411.81 680668.39 N 70 18 48.693 W 148 3 . 4 12470.89 37.18 15.35 8223.09 8284.09 7391.64 7482.10 7393.09 5690.32 4719.96 9.18 5966429.73 680673.21 N 70 18 48.868 W 148 32 8.381 12503.45 40.47 13.47 8248.46 8309.46 7410.26 7502.51 7411.55 5710.09 4725.02 10.73 5966449.61 680677.82 N 70 18 49.062 W 148 32 8.232 12534.30 39.83 12.73 8272.04 8333.04 7428.22 7522.40 7429.35 5729.47 4729.53 2.59 5966469.08 680681.87 N 70 18 49.253 W 148 32 8.100 12567.14 41.78 8.81 8296.90 8357.90 7447.20 7543.85 7448.16 5750.54 4733.53 9.80 5966490.24 680685.37 N 70 18 49.460 W 148 32 7.984 12598.01 45.60 7.12 8319.22 8380.22 7465.55 7565.17 7466.34 5771.66 4736.47 12.94 5966511.42 680687.82 N 70 18 49.668 W 148 32 7.897 12629.48 45.23 7.03 8341.31 8402.31 7484.66 7587.59 7485.29 5793.90 4739.23 1.19 5966533.72 680690.05 N 70 18 49.887 W 148 32 7.816 12661.36 47.37 4.19 8363.34 8424.34 7504.00 7610.63 7504.47 5816.83 4741.47 9.30 5966556.70 680691.76 N 70 18 50.112 W 148 32 7.751 12692.54 51.10 1.51 8383.69 8444.69 7523.16 7634.24 7523.49 5840.41 4742.63 13.62 5966580.30 680692.36 N 70 18 50.344 W 148 32 7.716 12723.54 50.73 1.56 8403.24 8464.24 7542.38 7658.30 7542.59 5864.46 4743.28 1.20 5966604.36 680692.45 N 70 18 50.581 W 148 32 7.697 12755.41 50.67 1.34 8423.42 8484.42 7562.05 7682.97 7562.16 5889.12 4743.90 0.57 5966629.02 680692.49 N 70 18 50.823 W 148 32 7.678 I 12787.08 53.01 1.18 8442.99 8503.99 7581.86 7707.87 7581.91 5914.01 4744.45 7.40 5966653.92 680692.45 N 70 18 51.068 W 148 32 7.662 12818.21 58.28 0.83 8460.55 8521.55 7602.23 7733.56 7602.24 5939.70 4744.90 16.95 5966679.60 680692.30 N 70 18 51.320 W 148 32 7.648 12850.06 59.27 1.28 8477.06 8538.06 7623.85 7760.79 7623.85 5966.93 4745.40 3.33 5966706.84 680692.16 N 70 18 51.588 W 148 32 7.633 12881.58 62.72 359.99 8492.34 8553.34 7645.59 7788.35 7645.62 5994.49 4745.70 11.52 5966734.40 680691.82 N 70 18 51.859 W 148 32 7.624 Tie -In Survey 12912.00 66.73 359.42 8505.33 8566.33 7667.01 7815.86 7667.12 6021.99 4745.55 13.29 5966761.88 680691.03 N 70 18 52.130 W 148 32 7.628 (KOP 12940'md) 12938.02 66.96 0.31 8515.56 8576.56 7685.69 7839.78 7685.89 6045.92 4745.50 3.27 5966785.80 680690.41 N 70 18 52.365 W 148 32 7.629 12969.25 62.70 358.81 8528.84 8589.84 7707.66 7868.04 7708.00 6074.17 4745.29 14.32 5966814.04 680689.54 N 70 18 52.643 W 148 32 7.635 SurveyEditor Ver SP 2.1 Bld( users) 15- 16 \15- 16 \15- 16B \15 -16B Generated 5/6/2010 1:12 PM Page 4 of 7 Measured Azimuth Vertical Along Hole NS EW Comments Depth Inclination True Sub•Sea TVD TVD Section Departure Closure True North True North DLS Northing Easting Latitude Longitude (ft) (deg) (deg) (ft ) (ft ) (ft ) (ft ) (ft ) (ft) (ft) (deg1100ft ) (ftUS) (ftUS) 13000.02 65.52 355.30 8542.28 8603.28 7728.38 7895.71 7728.92 6101.81 4743.86 13.76 5966841.63 680687.46 N 70 18 52.915 W 148 32 7.676 13032.34 68.81 354.07 8554.82 8615.82 7749.86 7925.50 7750.66 6131.46 4741.09 10.77 5966871.21 680684.01 N 70 18 53.206 W 148 32 7.756 13062.36 72.07 353.91 8564.87 8625.87 7770.01 7953.78 7771.13 6159.59 4738.13 10.87 5966899.26 680680.39 N 70 18 53.483 W 148 32 7.842 13092.77 75.99 351.48 8573.24 8634.24 7790.37 7983.01 7791.86 6188.58 4734.41 15.01 5966928.15 680675.99 N 70 18 53.768 W 148 32 7.950 13124.60 78.73 351.17 8580.20 8641.20 7811.46 8014.07 7813.43 6219.28 4729.72 8.66 5966958.73 680670.58 N 70 18 54.070 W 148 32 8.086 13156.96 79.16 351.10 8586.41 8647.41 7832.96 8045.83 7835.48 6250.66 4724.83 1.35 5966989.99 680664.96 N 70 18 54.379 W 148 32 8.228 13187.96 79.46 351.23 8592.16 8653.16 7853.59 8076.29 7856.70 6280.76 4720.15 1.05 5967019.97 680659.57 N 70 18 54.675 W 148 32 8.364 13219.79 79.60 351.18 8597.94 8658.94 7874.80 8107.59 7878.59 6311.69 4715.37 0.47 5967050.78 680654.07 N 70 18 54.979 W 148 32 8.503 13251.13 79.81 350.82 8603.54 8664.54 7895.61 8138.42 7900.13 6342.15 4710.54 1.31 5967081.11 680648.53 N 70 18 55.279 W 148 3243 13281.94 80.23 351.08 8608.88 8669.88 7916.08 8168.77 7921.37 6372.12 4705.77 1.60 5967110.96 680643.06 N 70 18 55.573 W 148 3 2 13313.77 80.65 350.25 8614.17 8675.17 7937.13 8200.16 7943.29 6403.09 4700.68 2.89 5967141.80 680637.24 N 70 18 55.878 W 148 3 0 13345.09 82.69 346.74 8618.71 8679.71 7957.03 8231.14 7964.14 6433.45 4694.50 12.86 5967172.00 680630.35 N 70 18 56.177 W 148 32 9.110 13377.35 85.00 343.95 8622.16 8683.16 7976.24 8263.21 7984.46 6464.47 4686.38 11.19 5967202.83 680621.51 N 70 18 56.482 W 148 32 9.346 13408.41 88.37 343.71 8623.96 8684.96 7994.15 8294.22 8003.54 6494.25 4677.75 10.88 5967232.39 680612.18 N 70 18 56.775 W 148 32 9.597 13438.41 89.57 341.54 8624.50 8685.50 8010.96 8324.21 8021.56 6522.87 4668.79 8.26 5967260.79 680602.56 N 70 18 57.056 W 148 32 9.858 13470.04 90.60 337.36 8624.45 8685.45 8027.20 8355.84 8039.22 6552.48 4657.69 13.61 5967290.13 680590.77 N 70 18 57.348 W 148 32 10.181 13502.40 90.70 335.04 8624.09 8685.09 8042.22 8388.20 8055.84 6582.09 4644.63 7.18 5967319.42 680577.02 N 70 18 57.639 W 148 32 10.562 13533.19 89.98 332.40 8623.90 8684.90 8055.32 8418.99 8070.58 6609.69 4631.00 8.89 5967346.70 680562.75 N 70 18 57.910 W 148 32 10.959 13563.74 89.95 329.44 8623.92 8684.92 8066.95 8449.54 8083.97 6636.39 4616.15 9.69 5967373.04 680547.28 N 70 18 58.173 W 148 32 11.392 13596.88 88.99 326.45 8624.23 8685.23 8077.96 8482.68 8097.04 6664.47 4598.57 9.48 5967400.70 680529.04 N 70 18 58.449 W 148 32 11.904 13627.49 89.05 324.07 8624.75 8685.75 8086.76 8513.28 8107.88 6689.62 4581.13 7.78 5967425.43 680511.02 N 70 18 58.697 W 148 32 12.413 13659.31 88.40 320.06 8625.46 8686.46 8094.20 8545.10 8117.59 6714.70 4561.58 12.76 5967450.05 680490.89 N 70 18 58.944 W 148 32 12.983 13691.29 88.13 316.47 8626.43 8687.43 8099.60 8577.06 8125.42 6738.55 4540.30 11.25 5967473.39 680469.06 N 70 18 59.178 W 148 32 13.603 13723.25 88.68 314.68 8627.32 8688.32 8103.51 8609.01 8131.91 6761.37 4517.94 5.86 5967495.67 680446.17 N 70 18 59.403 W 148 32 14.255 13754.62 88.41 314.52 8628.11 8689.11 8106.82 8640.37 8137.87 6783.39 4495.61 1.00 5967517.16 680423.33 N 70 18 59.620 W 148 32 14.906 13786.47 88.40 314.87 8629.00 8690.00 8110.24 8672.21 8144.09 6805.78 4472.98 1.10 5967539.02 680400.19 N 70 18 59.840 W 148 32 15.566 13818.22 88.92 316.22 8629.74 8690.74 8114.11 8703.95 8150.87 6828.44 4450.75 4.56 5967561.15 680377.43 N 70 19 0.063 W 148 32 16.214 13848.67 88.78 316.05 8630.35 8691.35 8118.13 8734.39 8157.79 6850.39 4429.65 0.72 5967582.59 680355.83 N 70 19 0.279 W 148 32 1 29 13880.05 87.51 314.75 8631.37 8692.37 8121.88 8765.75 8164.65 6872.72 4407.63 5.79 5967604.40 680333.29 N 70 19 0.499 W 148 32 1 13911.90 87.08 313.05 8632.87 8693.87 8124.85 8797.57 8170.90 6894.78 4384.71 5.50 5967625.92 680309.86 N 70 19 0.716 W 148 32 18.140 13942.36 88.61 309.32 8634.02 8695.02 8126.25 8828.01 8175.57 6914.82 4361.81 13.23 5967645.41 680286.49 N 70 19 0.913 W 148 32 18.808 13974.80 90.70 306.49 8634.21 8695.21 8125.90 8860.44 8178.84 6934.74 4336.21 10.84 5967664.73 680260.45 N 70 19 1.109 W 148 32 19.554 14006.47 92.59 305.24 8633.31 8694.31 8124.42 8892.10 8181.02 6953.29 4310.56 7.15 5967682.67 680234.37 N 70 19 1.292 W 148 32 20.302 14037.35 92.52 305.43 8631.93 8692.93 8122.69 8922.95 8182.99 6971.13 4285.40 0.66 5967699.91 680208.79 N 70 19 1.467 W 148 32 21.036 14068.90 90.73 304.51 8631.03 8692.03 8120.73 8954.48 8184.91 6989.20 4259.55 6.38 5967717.38 680182.53 N 70 19 1.645 W 148 32 21.790 14101.05 90.01 305.48 8630.83 8691.83 8118.74 8986.63 8187.01 7007.64 4233.22 3.76 5967735.19 680155.77 N 70 19 1.827 W 148 32 22.558 14130.95 90.05 304.72 8630.81 8691.81 8116.95 9016.53 8189.13 7024.83 4208.75 2.55 5967751.81 680130.92 N 70 19 1.996 W 148 32 23.272 14163.04 90.08 305.26 8630.77 8691.77 8114.96 9048.62 8191.47 7043.23 4182.46 1.69 5967769.58 680104.21 N 70 19 2.177 W 148 32 24.038 14193.71 89.77 305.65 8630.82 8691.82 8113.31 9079.29 8194.07 7061.03 4157.48 1.62 5967786.78 680078.81 N 70 19 2.352 W 148 32 24.767 14224.74 90.36 304.35 8630.78 8691.78 8111.39 9110.32 8196.57 7078.82 4132.06 4.60 5967803.98 680052.99 N 70 19 2.527 W 148 32 25.508 14256.85 90.43 304.29 8630.56 8691.56 8109.03 9142.43 8198.89 7096.93 4105.55 0.29 5967821.46 680026.06 N 70 19 2.705 W 148 32 26.282 14288.38 90.01 304.57 8630.44 8691.44 8106.77 9173.96 8201.36 7114.75 4079.54 1.60 5967838.67 679999.64 N 70 19 2.881 W 148 32 27.040 14318.54 90.08 304.19 8630.41 8691.41 8104.58 9204.12 8203.81 7131.78 4054.65 1.28 5967855.11 679974.36 N 70 19 3.048 W 148 32 27.766 14350.21 90.05 305.53 8630.38 8691.38 8102.55 9235.79 8206.76 7149.89 4028.66 4.23 5967872.60 679947.96 N 70 19 3.227 W 148 32 28.524 14382.56 89.95 305.98 8630.38 8691.38 8100.98 9268.14 8210.41 7168.79 4002.41 1.43 5967890.88 679921.27 N 70 19 3.413 W 148 32 29.290 14413.67 89.84 305.69 8630.43 8691.43 8099.51 9299.25 8214.07 7187.00 3977.19 1.00 5967908.49 679895.63 N 70 19 3.592 W 148 32 30.026 14444.30 89.77 306.47 8630.54 8691.54 8098.20 9329.88 8217.93 7205.04 3952.43 2.56 5967925.94 679870.46 N 70 19 3.769 W 148 32 30.748 SurveyEditor Ver SP 2.1 Bld( users) 15- 16 \15- 16 \15- 16B \15 -16B Generated 5/6/2010 1:12 PM Page 5 of 7 Measured Azimuth Vertical Along Hole NS I EW • Comments Inclination Sub -Sea TVD TVD Closure DLS Northing Easting Latitude Longitude Depth True Section Departure True North True North (ft) I (deg) I (deg) (ft ) (ft) (ft ) (ft) (ft) (ft) (ft) (deg/100ft) (ftUS) (ftUS) _ 14475.04 89.50 304.86 8630.73 8691.73 8096.65 9360.62 8221.69 7222.96 3927.46 5.31 5967943.28 679845.08 N 70 19 3.946 W 148 32 31.476 14506.94 91.90 302.28 8630.35 8691.35 8093.89 9392.52 8224.55 7240.60 3900.89 11.05 5967960.28 679818.10 N 70 19 4.119 W 148 32 32.251 14538.71 92.38 302.48 8629.16 8690.16 8090.49 9424.26 8226.86 7257.60 3874.08 1.64 5967976.65 679790.90 N 70 19 4.287 W 148 32 33.033 14570.27 92.69 301.27 8627.76 8688.76 8086.83 9455.79 8229.00 7274.25 3847.30 3.95 5967992.67 679763.74 N 70 19 4.451 W 148 32 33.814 14602.04 94.00 300.86 8625.91 8686.91 8082.70 9487.51 8230.82 7290.61 3820.13 4.32 5968008.39 679736.20 N 70 19 4.612 W 148 32 34.606 14633.44 93.00 300.45 8623.99 8684.99 8078.40 9518.85 8232.52 7306.59 3793.17 3.44 5968023.73 679708.88 N 70 19 4.769 W 148 32 35.393 14665.09 92.48 299.91 8622.48 8683.48 8073.80 9550.46 8234.10 7322.49 3765.85 2.37 5968038.98 679681.19 N 70 19 4.925 W 148 32 36.190 14695.33 92.48 299.65 8621.17 8682.17 8069.20 9580.68 8235.51 7337.49 3739.62 0.86 5968053.37 679654.62 N 70 19 5.073 W 148 32 36.955 14727.20 92.93 299.45 8619.67 8680.67 8064.23 9612.51 8236.98 7353.19 3711.93 1.54 5968068.41 679626.57 N 70 19 5.228 W 148 32 �3 14758.38 92.69 299.11 8618.14 8679.14 8059.22 9643.65 8238.39 7368.42 3684.77 1.33 5968083.00 679599.06 N 70 19 5.378 W 148 32 5 14788.92 92.86 298.34 8616.66 8677.66 8054.02 9674.16 8239.60 7383.08 3658.02 2.58 5968097.03 679571.97 N 70 19 5.522 W 148 32 5 14821.09 93.55 298.08 8614.86 8675.86 8048.26 9706.28 8240.70 7398.27 3629.71 2.29 5968111.54 679543.32 N 70 19 5.671 W 148 32 40.161 14853.20 93.72 299.20 8612.83 8673.83 8042.75 9738.32 8242.16 7413.62 3601.59 3.52 5968126.24 679514.85 N 70 19 5.823 W 148 32 40.982 14883.93 93.24 300.02 8610.96 8671.96 8037.99 9768.99 8244.20 7428.78 3574.92 3.09 5968140.76 679487.84 N 70 19 5.972 W 148 32 41.759 14915.71 92.79 299.66 8609.29 8670.29 8033.19 9800.73 8246.55 7444.57 3547.39 1.81 5968155.90 679459.95 N 70 19 6.127 W 148 32 42.563 14947.02 92.31 299.98 8607.90 8668.90 8028.44 9832.01 8248.98 7460.13 3520.26 1.84 5968170.82 679432.45 N 70 19 6.280 W 148 32 43.354 14978.92 91.97 300.19 8606.70 8667.70 8023.76 9863.89 8251.72 7476.11 3492.67 1.25 5968186.15 679404.51 N 70 19 6.438 W 148 32 44.159 15011.17 91.73 300.47 8605.66 8666.66 8019.15 9896.12 8254.76 7492.38 3464.85 1.14 5968201.77 679376.31 N 70 19 6.598 W 148 32 44.970 15042.20 92.48 299.16 8604.52 8665.52 8014.45 9927.13 8257.51 7507.80 3437.95 4.86 5968216.55 679349.06 N 70 19 6.750 W 148 32 45.755 15074.05 92.65 299.63 8603.10 8664.10 8009.39 9958.95 8260.23 7523.42 3410.22 1.57 5968231.51 679320.98 N 70 19 6.903 W 148 32 46.564 15106.56 93.72 298.39 8601.29 8662.29 8004.02 9991.41 8262.91 7539.16 3381.84 5.03 5968246.58 679292.23 N 70 19 7.058 W 148 32 47.392 15138.44 94.44 298.93 8599.02 8660.02 7998.56 10023.21 8265.47 7554.41 3353.94 2.82 5968261.17 679263.98 N 70 19 7.208 W 148 32 48.206 15167.76 93.89 299.13 8596.89 8657.89 7993.73 10052.45 8268.12 7568.60 3328.37 2.00 5968274.76 679238.09 N 70 19 7.348 W 148 32 48.952 15200.34 94.24 299.19 8594.58 8655.58 7988.44 10084.95 8271.25 7584.43 3299.99 1.09 5968289.92 679209.35 N 70 19 7.504 W 148 32 49.780 15231.19 94.28 298.43 8592.29 8653.29 7983.24 10115.71 8274.15 7599.26 3273.03 2.46 5968304.11 679182.05 N 70 19 7.650 W 148 32 50.566 15262.11 93.76 298.61 8590.12 8651.12 7977.87 10146.55 8277.01 7613.99 3245.93 1.78 5968318.20 679154.62 N 70 19 7.795 W 148 32 51.357 15294.12 93.82 299.04 8588.01 8649.01 7972.48 10178.49 8280.26 7629.39 3217.95 1.35 5968332.94 679126.28 N 70 19 7.946 W 148 32 5 73 15326.27 94.96 300.86 8585.55 8646.55 7967.69 10210.55 8284.27 7645.39 3190.17 6.67 5968348.28 679098.15 N 70 19 8.104 W 148 32 3 15356.29 93.97 301.78 8583.21 8644.21 7963.93 10240.48 8288.84 7660.95 3164.61 4.50 5968363.24 679072.22 N 70 19 8.257 W 148 32 9 15388.19 90.83 300.69 8581.88 8642.88 7959.88 10272.35 8293.77 7677.47 3137.36 10.42 5968379.12 679044.60 N 70 19 8.420 W 148 32 54.524 15420.81 90.46 300.16 8581.51 8642.51 7955.27 10304.96 8298.48 7693.99 3109.23 1.98 5968394.97 679016.09 N 70 19 8.582 W 148 32 55.345 15452.58 90.15 300.95 8581.34 8642.34 7950.86 10336.73 8303.26 7710.14 3081.87 2.67 5968410.48 678988.37 N 70 19 8.741 W 148 32 56.143 15484.18 89.78 300.64 8581.36 8642.36 7946.60 10368.33 8308.27 7726.32 3054.73 1.53 5968426.01 678960.85 N 70 19 8.900 W 148 32 56.934 15516.17 90.66 300.20 8581.24 8642.24 7942.08 10400.32 8313.25 7742.51 3027.14 3.08 5968441.56 678932.90 N 70 19 9.060 W 148 32 57.739 15546.67 90.36 300.51 8580.96 8641.96 7937.74 10430.82 8318.08 7757.93 3000.83 1.41 5968456.35 678906.23 N 70 19 9.211 W 148 32 58.507 Last Survey 15577.63 90.32 301.28 8580.78 8641.78 7933.62 10461.78 8323.37 7773.82 2974.26 2.49 5968471.62 678879.30 N 70 19 9.368 W 148 32 59.282 TD (Projected) 15634.00 90.32 301.28 8580.47 8641.47 7926.50 10518.15 8333.68 7803.09 2926.09 0.00 5968499.75 678830.45 N 70 19 9.656 W 148 33 0.688 Survey Error Model: SLB ISCWSA version 24 * ** 3 -D 95.00% Confidence 2.7955 sigma Surveying Prog: MD From ( ft 1 MD To ( ft ). EOU Freq Survey Tool Type Borehole -> Survey 0.00 30.00 Act -Stns SLB_ZERO -Depth Only 15 -16 -> 15 -16 30.00 4540.00 Act -Stns SLB_CNSG +CASING 15 -16 -> 15 -16 4540.00 4604.00 Act -Stns SLB_BLIND 15- 16BPB1 -> 15- 16BPB1 4604.00 4720.47 Act -Stns SLB_INC +TREND 15- 16BPB1 -> 15- 16BPB1 4720.47 12912.00 Act -Stns SLB_MWD +GMAG 15- 16BPB1 -> 15- 16BPB1 12912.00 15577.63 Act -Stns SLB_MWD +GMAG 15 -16B -> 15 -16B 15577.63 15634.00 Act -Stns SLB ZERO 15 -16B -> 15 -16B SurveyEditor Ver SP 2.1 Bld( users) 15- 16 \15- 16 \15- 16B \15 -16B Generated 5/6/2010 1:12 PM Page 6 of 7 Measured Azimuth Vertical Along Hole NS EW Comments Inclination Sub•Sea TVD TVD Closure DLS Northing Easting Latitude Longitude Depth True Section Departure True North True North I (ft ) (deg) (deg) (ft) (ft) (ft) (ft ) (ft ) (ft ) (ft ) (deg/100ft ) (ftUS) (ftUS) Legal Description: Northing (Y) fftUSl Easting (X) fftUS1 Surface : 4426 FSL 5115 FEL S22 T11N R14E UM 5960630.76 676088.19 BHL : 1668 FSL 2173 FEL S10 T11N R14E UM 5968499.75 678830.45 italicized stations are NOT used in position calculations. Final Definitive Survey Verify and Sign -off I have checked to the best of my ability that the following data is correct: • Surface Coordinates and Reference Elevations Declination Information Survey Tool Codes SLB DE: Client Representative: Date: • I I SurveyEditor Ver SP 2.1 Bld( users) 15- 16 \15- 16 \15- 16B \15 -168 Generated 5/6/2010 1:12 PM Page 7 of 7 SCHLUMBERGER Survey report 4- Apr -2010 16:42:39 Page 1 of 10 Client • BPXA Field • Prudhoe Bay Unit - EGA Well • 15 -16B Spud date • 18- Mar -10 API number • 50- 029 - 2115 -02 Last survey date • 04- Apr -10 Engineer • S. Ziadeh Total accepted surveys...: 251 MD of first survey 0.00 ft RIG• • Naboors 7ES MD of last survey • 15634.00 ft 0 STATE • Alaska Survey calculation methods Geomagnetic data Method for positions • Minimum curvature Magnetic model • BGGM version 2009 Method for DLS • Mason & Taylor Magnetic date • 25- Mar -2010 Magnetic field strength..: 57689.70 GAMA Depth reference Magnetic dec ( +E /W -) 22.31 degrees Permanent datum • Mean Sea Level Magnetic dip 80.95 degrees Depth reference • Driller's Depth GL above permanent • 32.80 ft MWD survey Reference Criteria KB above permanent • Top Drive Reference G 1002.68 mGal DF above permanent • 61.00 ft Reference H • 57689.50 GAMA Reference Dip 80.95 degrees Vertical section origin Tolerance of G • ( + / -) 2.50 mGal Latitude ( +N /S -) 0.00 ft Tolerance of H • ( +/- )300.00 GAMA Departure ( +E /W -) 0.00 ft Tolerance of Dip • ( + / -) 0.45 degrees ?.. Platform reference point Corrections 1 Latitude ( +N /S -) • - 999.25 ft Magnetic dec ( +E /W -) 22.31 degrees Departure ( +E /W -) - 999.25 ft Grid convergence ( +E /W -).: 0.00 degrees Total az corr ( +E /W -) 22.31 degrees tit.! Azimuth from Vsect Origin to target: 315.00 degrees (Total az corr = magnetic dec - grid conv) Survey Correction Type .... I =Sag Corrected Inclination M= Schlumberger Magnetic Correction S =Shell Magnetic Correction F= Failed Axis Correction R= Magnetic Resonance Tool Correction D =Dmag Magnetic Correction [(c)2010 IDEAL ID15 0C 05] SCHLUMBERGER Survey Report 4- Apr -2010 16:42:39 Page 2 of 10 Seq Measured Incl Azimuth Course TVD Vertical Displ Displ Total At DLS Srvy Tool # depth angle angle length depth section +N /S- +E /W- displ Azim (deg/ tool Corr - (ft) (deg) (deg) (ft) (ft) (ft) (ft) (ft) (ft) (deg) 100f) type (deg) 1 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 TIP 2 30.00 0.00 0.00 30.00 30.00 0.00 0.00 0.00 0.00 0.00 0.00 SLB_DEPTH_ONLY 3 90.00 0.37 179.86 60.00 90.00 -0.14 -0.19 0.00 0.19 179.86 0.62 SLB_CNSG_CASING 4 190.00 0.43 158.08 100.00 190.00 -0.71 -0.86 0.14 0.88 170.72 0.16 SLB_CNSG_CASING 0 5 290.00 0.36 180.27 100.00 289.99 -1.28 -1.53 0.28 1.55 169.61 0.17 SLB_CNSG_CASING 6 390.00 0.51 168.24 100.00 389.99 -1.87 -2.28 0.37 2.31 170.79 0.17 SLB_CNSG_CASING 7 490.00 0.43 179.07 100.00 489.99 -2.51 -3.09 0.47 3.12 171.42 0.12 SLB_CNSG_CASING 8 590.00 0.49 164.12 100.00 589.99 -3.16 -3.87 0.59 3.92 171.35 0.13 SLB_CNSG_CASING 9 690.00 0.41 178.64 100.00 689.98 -3.79 -4.64 0.71 4.70 171.25 0.14 SLB_CNSG_CASING 10 790.00 0.12 121.30 100.00 789.98 -4.15 -5.06 0.81 5.12 170.87 0.36 SLB_CNSG_CASING 11 890.00 0.37 81.65 100.00 889.98 -4.44 -5.06 1.22 5.21 166.44 0.29 SLB_CNSG_CASING 12 990.00 0.43 85.77 100.00 989.98 -4.88 -4.99 1.92 5.34 159.00 0.07 SLB_CNSG_CASING 13 1090.00 0.32 93.93 100.00 1089.98 -5.34 -4.98 2.57 5.60 152.72 0.12 SLB_CNSG_CASING 14 1190.00 0.30 72.48 100.00 1189.97 -5.67 -4.92 3.10 5.81 147.82 0.12 SLB_CNSG_CASING 15 1290.00 0.40 81.01 100.00 1289.97 -5.99 -4.79 3.69 6.04 142.37 0.11 SLB_CNSG_CASING 16 1390.00 0.40 115.46 100.00 1389.97 -6.53 -4.88 4.35 6.54 138.30 0.24 SLB_CNSG_CASING 17 1490.00 0.31 96.64 100.00 1489.97 -7.07 -5.06 4.93 7.07 135.74 0.15 SLB_CNSG_CASING 18 1590.00 0.46 131.91 100.00 1589.97 -7.68 -5.36 5.50 7.68 134.27 0.27 SLB_CNSG_CASING 19 1690.00 0.41 126.75 100.00 1689.96 -8.44 -5.85 6.09 8.44 133.84 0.06 SLB_CNSG_CASING 20 1790.00 0.28 164.95 100.00 1789.96 -9.00 -6.30 6.44 9.00 134.36 0.26 SLB_CNSG_CASING • 21 1890.00 0.34 163.56 100.00 1889.96 -9.48 -6.82 6.58 9.48 135.99 0.06 SLB_CNSG_CASING 22 1990.00 0.53 67.10 100.00 1989.96 -9.91 -6.92 7.09 9.91 134.29 0.66 SLB_CNSG_CASING 23 2090.00 0.64 69.28 100.00 2089.95 -10.31 -6.54 8.04 10.37 129.13 0.11 SLB_CNSG_CASING 24 2190.00 0.60 82.25 100.00 2189.95 -10.86 -6.27 9.08 11.04 124.63 0.15 SLB_CNSG_CASING 25 2290.00 0.86 153.02 100.00 2289.94 -11.89 -6.87 9.94 12.09 124.65 0.87 SLB_CNSG_CASING 26 2390.00 0.96 160.89 100.00 2389.93 -13.36 -8.33 10.56 13.45 128.28 0.16 SLB_CNSG_CASING 27 2485.00 0.89 153.98 95.00 2484.91 -14.77 -9.75 11.14 14.80 131.18 0.14 SLB_CNSG_CASING 28 2490.00 0.89 153.59 5.00 2489.91 -14.85 -9.82 11.18 14.88 131.30 0.12 SLB_CNSG_CASING 29 2590.00 1.43 24.44 100.00 2589.90 -15.14 -9.38 12.04 15.26 127.92 2.11 SLB_CNSG_CASING 30 2690.00 4.99 19.36 100.00 2689.73 -12.82 -4.14 14.00 14.60 106.46 3.57 SLB_CNSG_CASING SCHLUMBERGER Survey Report 4-Apr-2010 16:42:39 Page 3 of 10 Seq Measured Incl Azimuth Course TVD Vertical Displ Displ Total At DLS Srvy Tool # depth angle angle length depth section +N /S- +E /W- displ Azim (deg/ tool Corr - (ft) (deg) (deg) (ft) (ft) (ft) (ft) (ft) (ft) (deg) 100f) type (deg) 31 2790.00 6.55 12.61 100.00 2789.22 -7.89 5.53 16.68 17.58 71.65 1.70 SLB_CNSG_CASING 32 2890.00 8.25 7.65 100.00 2888.39 -0.48 18.21 18.88 26.24 46.04 1.81 SLB_CNSG_CASING 33 2990.00 9.99 13.86 100.00 2987.12 8.36 33.74 21.92 40.24 33.00 2.00 SLB_CNSG_CASING 34 3090.00 11.39 28.91 100.00 3085.40 15.59 50.81 28.77 58.39 29.52 3.11 SLB_CNSG_CASING • 35 3190.00 12.85 35.21 100.00 3183.18 20.21 68.54 39.96 79.34 30.24 1.97 SLB_CNSG_CASING 36 3290.00 13.38 25.23 100.00 3280.58 26.02 88.10 51.30 101.95 30.21 2.32 SLB_CNSG_CASING 37 3340.00 14.04 24.08 50.00 3329.15 30.14 98.87 56.24 113.75 29.63 1.43 SLB_CNSG_CASING 38 3390.00 14.79 23.96 50.00 3377.58 34.60 110.24 61.31 126.14 29.08 1.50 SLB_CNSG_CASING 39 3440.00 15.54 24.87 50.00 3425.84 39.20 122.15 66.72 139.18 28.64 1.57 SLB_CNSG_CASING 40 3490.00 16.40 26.22 50.00 3473.91 43.77 134.56 72.65 152.92 28.37 1.87 SLB CNSG CASING 41 3540.00 17.20 27.38 50.00 3521.77 48.28 147.45 79.17 167.37 28.23 1.73 SLB_CNSG_CASING 42 3590.00 18.81 29.52 50.00 3569.33 52.67 161.03 86.54 182.82 28.25 3.48 SLB_CNSG_CASING 43 3640.00 20.34 30.37 50.00 3616.43 57.02 175.55 94.91 199.56 28.40 3.11 SLB_CNSG_CASING 44 3690.00 21.45 31.12 50.00 3663.15 61.41 190.87 104.03 217.38 28.59 2.28 SLB_CNSG_CASING 45 3740.00 22.83 31.56 50.00 3709.46 65.86 206.96 113.83 236.20 28.81 2.78 SLB_CNSG_CASING 46 3790.00 24.12 31.76 50.00 3755.32 70.45 223.92 124.29 256.10 29.03 2.58 SLB_CNSG_CASING 47 3840.00 25.64 31.75 50.00 3800.68 75.27 241.80 135.36 277.11 29.24 3.04 SLB_CNSG_CASING 48 3890.00 27.86 31.39 50.00 3845.32 80.50 260.98 147.14 299.60 29.41 4.45 SLB_CNSG_CASING 49 3940.00 29.43 31.59 50.00 3889.20 86.10 281.42 159.66 323.55 29.57 3.15 SLB_CNSG_CASING 50 3990.00 31.04 31.61 50.00 3932.40 91.93 302.86 172.85 348.71 29.71 3.22 SLB_CNSG_CASING • 51 4040.00 32.33 31.79 50.00 3974.95 97.97 325.20 186.65 374.96 29.85 2.59 SLBCNSGCASING 52 4090.00 33.53 32.30 50.00 4016.91 104.06 348.24 201.07 402.12 30.00 2.46 SLB_CNSG_CASING 53 4140.00 34.98 32.84 50.00 4058.24 110.12 371.96 216.22 430.24 30.17 2.96 SLB_CNSG_CASING 54 4190.00 36.31 33.17 50.00 4098.87 116.17 396.39 232.10 459.34 30.35 2.69 SLB_CNSG_CASING 55 4240.00 38.51 33.62 50.00 4138.58 122.28 421.75 248.82 489.67 30.54 4.43 SLB_CNSG_CASING 56 4290.00 40.39 33.70 50.00 4177.19 128.53 448.19 266.43 521.40 30.73 3.76 SLB_CNSG_CASING 57 4340.00 42.01 33.81 50.00 4214.81 134.95 475.57 284.73 554.29 30.91 3.24 SLB_CNSG_CASING 58 4390.00 43.50 33.74 50.00 4251.52 141.56 503.78 303.59 588.19 31.07 2.98 SLB_CNSG_CASING 59 4440.00 44.46 33.81 50.00 4287.50 148.31 532.64 322.90 622.87 31.22 1.92 SLB_CNSG_CASING 60 4490.00 45.45 33.90 50.00 4322.88 155.14 561.98 342.58 658.17 31.37 1.98 SLB_CNSG_CASING SCHLUMBERGER Survey Report 4- Apr -2010 16:42:39 Page 4 of 10 Seq Measured Incl Azimuth Course TVD Vertical Displ Displ Total At DLS Srvy Tool depth angle angle length depth section +N /S- +E /W- displ Azim (deg/ tool Corr - (ft) (deg) (deg) (ft) (ft) (ft) (ft) (ft) (ft) (deg) 100f) type (deg) 61 4540.00 47.24 34.25 50.00 4357.40 162.00 591.94 362.85 694.30 31.51 3.62 SLB_CNSGCASING 62 4587.00 49.09 34.55 47.00 4388.74 168.44 620.84 382.63 729.28 31.65 3.96 SLB_Blind 63 4604.00 49.90 37.00 17.00 4399.79 170.51 631.32 390.19 742.17 31.72 11.95 SLB_Blind 64 4626.54 49.22 38.00 22.54 4414.41 172.75 644.93 400.63 759.24 31.85 4.53 SLB_INC +Trend 65 4720.47 51.78 43.80 93.93 4474.18 177.86 699.62 448.10 830.82 32.64 5.49 SLB_INC +Trend 66 4813.93 56.37 48.05 93.46 4529.02 176.55 752.17 502.49 904.58 33.74 6.14 SLB_MWD +GMAG 67 4906.86 59.65 44.78 92.93 4578.25 174.65 806.52 559.53 981.61 34.75 4.62 SLB_MWD +GMAG 68 5003.33 62.85 48.04 96.47 4624.66 172.53 864.79 620.80 1064.55 35.67 4.45 SLB_MWD +GMAG 69 5096.00 65.42 41.60 92.67 4665.11 172.84 923.93 679.49 1146.89 36.33 6.84 SLB_MWD +GMAG 70 5193.19 66.05 41.60 97.19 4705.05 178.10 990.19 738.32 1235.15 36.71 0.65 SLB MWD +GMAG 71 5286.33 66.86 41.77 93.14 4742.26 183.04 1053.95 795.10 1320.23 37.03 0.89 SLB_MWD +GMAG 72 5378.55 66.00 40.77 92.22 4779.14 188.53 1117.48 850.86 1404.54 37.29 1.36 SLB_MWD +GMAG 73 5472.62 64.46 39.04 94.07 4818.55 196.11 1182.99 905.65 1489.86 37.44 2.34 SLB_MWD +GMAG 74 5570.80 65.40 38.90 98.18 4860.15 205.45 1252.13 961.58 1578.76 37.52 0.97 SLB_MWD +GMAG 75 5666.46 63.33 38.54 95.66 4901.54 214.88 1319.42 1015.53 1664.98 37.58 2.19 SLB MWD +GMAG 76 5757.98 63.20 38.03 91.52 4942.71 224.44 1383.58 1066.17 1746.71 37.62 0.52 SLB_MWD +GMAG 77 5852.93 63.06 39.82 94.95 4985.63 233.40 1449.47 1119.38 1831.38 37.68 1.69 SLB_MWD +GMAG 78 5947.04 63.90 43.51 94.11 5027.66 238.29 1512.35 1175.35 1915.37 37.85 3.62 SLB_MWD +GMAG 79 6041.27 64.55 44.66 94.23 5068.63 239.64 1573.30 1234.39 1999.75 38.12 1.30 SLB_MWD +GMAG 80 6136.26 64.38 47.07 94.99 5109.58 238.35 1632.98 1295.90 2084.70 38.43 2.30 SLB MWD +GMAG • 81 6230.93 65.05 46.45 94.67 5150.02 235.72 1691.62 1358.26 2169.43 38.76 0.92 SLB_MWD +GMAG 82 6259.71 65.49 46.48 28.78 5162.06 235.05 1709.63 1377.21 2195.34 38.85 1.53 SLB_MWD +GMAG 83 6318.80 67.15 45.22 59.09 5185.79 234.26 1747.32 1416.03 2249.06 39.02 3.42 SLB_MWD +GMAG 84 6368.92 63.86 46.23 50.12 5206.57 233.68 1779.16 1448.68 2294.35 39.15 6.82 SLB_MWD +GMAG 85 6410.76 61.23 46.69 41.84 5225.86 232.74 1804.73 1475.59 2331.18 39.27 6.36 SLB MWD +GMAG 86 6504.67 61.20 47.28 93.91 5271.08 229.89 1860.88 1535.77 2412.77 39.53 0.55 SLB_MWD +GMAG 87 6596.18 61.28 48.08 91.51 5315.11 226.14 1914.89 1595.08 2492.21 39.79 0.77 SLBMWD +GMAG 88 6699.05 61.46 47.28 102.87 5364.40 221.92 1975.68 1661.84 2581.67 40.07 0.70 SLB_MWD +GMAG 89 6796.68 61.11 47.94 97.63 5411.31 218.02 2033.41 1725.08 2666.58 40.31 0.69 SLBMWD +GMAG 90 6886.49 61.53 47.54 89.81 5454.41 214.25 2086.39 1783.39 2744.73 40.52 0.61 SLB MWD +GMAG SCHLUMBERGER Survey Report 4- Apr -2010 16:42:39 Page 5 of 10 Seq Measured Incl Azimuth Course TVD Vertical Displ Displ Total At DLS Srvy Tool depth angle angle length depth section +N /S- +E /W- displ Azim (deg/ tool Corr (ft) (deg) (deg) (ft) (ft) (ft) (ft) (ft) (ft) (deg) 100f) type (deg) 91 6980.91 60.83 46.42 94.42 5499.93 211.39 2142.83 1843.87 2826.94 40.71 1.28 SLB_MWD +GMAG 92 7075.82 62.24 46.48 94.91 5545.16 209.28 2200.31 1904.34 2909.97 40.88 1.49 SLB_MWD +GMAG 93 7170.28 61.35 44.92 94.46 5589.81 208.26 2258.45 1963.92 2992.92 41.01 1.73 SLBMWD +GMAG 94 7264.26 61.13 43.53 93.98 5635.03 209.37 2317.48 2021.38 3075.18 41.10 1.32 SLB__MWD +GMAG 95 7357.92 64.10 44.99 93.66 5678.10 210.43 2377.02 2079.43 3158.20 41.18 3.46 SLB_MWD +GMAG 96 7453.73 66.20 45.16 95.81 5718.36 210.32 2438.41 2140.98 3244.94 41.28 2.20 SLB_MWD +GMAG 97 7548.68 66.40 45.16 94.95 5756.53 210.07 2499.72 2202.63 3331.69 41.38 0.21 SLB_MWD +GMAG 98 7643.91 66.66 45.51 95.23 5794.46 209.56 2561.12 2264.76 3418.84 41.49 0.43 SLB_MWD +GMAG 99 7734.70 66.23 45.30 90.79 5830.74 208.97 2619.55 2324.02 3501.88 41.58 0.52 SLBMWD +GMAG 100 7829.73 66.95 45.54 95.03 5868.49 208.33 2680.77 2386.13 3588.89 41.67 0.79 SLB _ MWD +GMAG 101 7924.91 66.18 45.79 95.18 5906.35 207.32 2741.80 2448.60 3676.01 41.77 0.84 SLB_MWD +GMAG 102 8022.53 66.32 45.30 97.62 5945.66 206.47 2804.37 2512.38 3765.17 41.86 0.48 SLB_MWD +GMAG 103 8116.99 65.94 44.40 94.46 5983.89 206.70 2865.61 2573.30 3851.44 41.92 0.96 SLB_MWD +GMAG 104 8210.59 65.92 43.97 93.60 6022.06 207.91 2926.89 2632.86 3936.83 41.97 0.42 SLBMWD +GMAG 105 8303.68 66.06 43.13 93.09 6059.94 210.06 2988.53 2691.45 4021.84 42.01 0.84 SLB _ MWD +GMAG 106 8397.95 65.51 42.44 94.27 6098.61 213.38 3051.62 2749.85 4107.80 42.02 0.89 SLB_4WD +GMAG 107 8490.59 65.38 41.74 92.64 6137.11 217.66 3114.15 2806.33 4192.06 42.02 0.70 SLB_MWD +GMAG 108 8584.52 65.53 39.71 93.93 6176.13 224.03 3178.90 2862.07 4277.48 42.00 1.97 SLB_MWD +GMAG 109 8678.96 65.55 38.62 94.44 6215.24 232.77 3245.55 2916.36 4363.34 41.94 1.05 SLB_MWD +GMAG 110 8776.77 65.64 38.11 97.81 6255.65 243.06 3315.39 2971.64 4452.24 41.87 0.48 SLB MWD +GMAG • 111 8872.08 65.77 39.26 95.31 6294.86 252.62 3383.19 3025.94 4538.98 41.81 1.11 SLB_MWD +GMAG 112 8966.07 65.72 40.92 93.99 6333.48 259.95 3448.75 3081.12 4624.63 41.78 1.61 SLB_MWD +GMAG 113 9059.53 65.45 41.68 93.46 6372.11 265.44 3512.68 3137.29 4709.73 41.77 0.79 SLB_MWD +GMAG 114 9153.43 65.49 41.05 93.90 6411.09 270.86 3576.80 3193.74 4795.15 41.76 0.61 SLB_MWD +GMAG 115 9247.90 65.39 40.28 94.47 6450.36 277.35 3641.97 3249.73 4881.05 41.74 0.75 SLB MWD +GMAG 116 9343.13 65.39 39.26 95.23 6490.02 285.25 3708.52 3305.11 4967.58 41.71 0.97 SLB_MWD +GMAG 117 9436.42 65.42 39.65 93.29 6528.85 293.44 3774.01 3359.02 5052.34 41.67 0.38 SLB_MWD +GMAG 118 9531.09 65.49 39.44 94.67 6568.17 301.63 3840.42 3413.85 5138.40 41.63 0.21 SLB_MWD +GMAG 119 9624.40 65.35 38.85 93.31 6606.99 310.28 3906.23 3467.41 5223.17 41.59 0.59 SLB_MWD +GMAG 120 9718.66 65.40 38.86 94.26 6646.26 319.46 3972.95 3521.17 5308.77 41.55 0.05 SLB MWD +GMAG SCHLUMBERGER Survey Report 4- Apr -2010 16:42:39 Page 6 of 10 Seq Measured Incl Azimuth Course TVD Vertical Displ Displ Total At DLS Srvy Tool depth angle angle length depth section +N /S- +E /W- displ Azim (deg/ tool Corr (ft) (deg) (deg) (ft) (ft) (ft) (ft) (ft) (ft) (deg) 100f) type (deg) 121 9812.95 65.32 38.39 94.29 6685.57 328.97 4039.91 3574.67 5394.36 41.50 0.46 SLB_MWD +GMAG 122 9908.17 65.45 39.06 95.22 6725.23 338.43 4107.44 3628.82 5480.83 41.46 0.65 SLBMWD +GMAG 123 10002.84 65.73 39.81 94.67 6764.36 346.79 4174.03 3683.58 5566.98 41.43 0.78 SLB__MWD +GMAG 124 10097.24 66.79 41.45 94.40 6802.36 353.37 4239.60 3739.85 5653.38 41.42 1.95 SLB_MWD +GMAG 125 10193.30 66.02 43.10 96.06 6840.82 357.56 4304.73 3799.06 5741.39 41.43 1.77 SLB_MWD +GMAG 126 10286.68 65.22 45.46 93.38 6879.37 358.64 4365.62 3858.43 5826.33 41.47 2.46 SLB_MWD +GMAG 127 10381.40 65.65 45.37 94.72 6918.74 358.01 4426.10 3919.79 5912.28 41.53 0.46 SLB_MWD +GMAG 128 10476.11 65.93 45.43 94.71 6957.58 357.41 4486.75 3981.29 5998.47 41.58 0.30 SLBMWD +GMAG 129 10569.67 65.90 45.52 93.56 6995.76 356.70 4546.64 4042.19 6083.69 41.64 0.09 SLB_MWD +GMAG 130 10664.13 65.90 45.38 94.46 7034.33 356.02 4607.13 4103.64 6169.72 41.69 0.14 SLB MWD +GMAG 131 10757.63 63.84 44.46 93.50 7074.04 356.13 4667.06 4163.41 6254.24 41.74 2.38 SLB_MWD +GMAG 132 10853.14 60.04 43.42 95.51 7118.96 357.68 4727.73 4221.89 6338.44 41.77 4.09 SLB_MWD +GMAG 133 10947.88 57.26 40.47 94.74 7168.25 361.96 4787.87 4275.98 6419.33 41.77 3.96 SLB_MWD +GMAG 134 11039.80 53.73 39.27 91.92 7220.32 368.72 4845.99 4324.54 6495.02 41.75 3.99 SLB_MWD +GMAG 135 11135.27 51.98 36.23 95.47 7277.97 378.29 4906.13 4371.14 6570.92 41.70 3.13 SLB MWD +GMAG 136 11228.64 51.31 33.78 93.37 7335.92 390.99 4966.09 4413.14 6643.64 41.63 2.18 SLBMWD +GMAG 137 11323.20 50.84 31.00 94.56 7395.33 407.04 5028.20 4452.55 6716.25 41.53 2.34 SLB__MWD +GMAG 138 11417.12 49.15 29.95 93.92 7455.71 425.08 5090.20 4489.04 6786.87 41.41 1.99 SLB_MWD +GMAG 139 11512.52 46.22 28.86 95.40 7519.93 444.03 5151.63 4523.68 6855.88 41.29 3.19 SLB_MWD +GMAG 140 11607.94 43.19 28.33 95.42 7587.74 462.97 5210.56 4555.81 6921.37 41.16 3.20 SLB MWD +GMAG 141 11700.55 40.75 26.16 92.61 7656.59 481.83 5265.60 4584.18 6981.49 41.04 3.07 SLB_MWD +GMAG 142 11795.50 37.26 20.32 94.95 7730.39 503.85 5320.40 4607.84 7038.39 40.89 5.33 SLB_MWD +GMAG 143 11890.04 33.52 15.98 94.54 7807.46 528.48 5372.36 4624.98 7088.91 40.72 4.76 SLB_MWD +GMAG 144 11984.92 34.83 15.02 94.88 7885.96 554.73 5423.72 4639.21 7137.16 40.54 1.49 SLB_MWD +GMAG 145 12079.57 34.93 14.55 94.65 7963.60 581.97 5476.05 4653.02 7185.94 40.35 0.30 SLB MWD +GMAG 146 12173.85 35.46 17.28 94.28 8040.65 608.37 5528.30 4667.93 7235.44 40.18 1.76 SLB_MWD +GMAG 147 12268.00 34.76 18.75 94.15 8117.67 632.94 5579.79 4684.67 7285.61 40.02 1.17 SLB_MWD +GMAG 148 12335.13 34.68 17.99 67.13 8172.85 650.08 5616.08 4696.72 7321.17 39.91 0.66 SLB_MWD +GMAG 149 12409.41 34.75 17.52 74.28 8233.91 669.45 5656.36 4709.62 7360.36 39.78 0.37 SLB_INC +TREND 150 12439.21 34.56 17.51 29.80 8258.42 677.27 5672.52 4714.72 7376.05 39.73 0.64 SLB MWD +GMAG SCHLUMBERGER Survey Report 4- Apr -2010 16:42:39 Page 7 of 10 Seq Measured Incl Azimuth Course TVD Vertical Displ Displ Total At DLS Srvy Tool depth angle angle length depth section +N /S- +E /W- displ Azim (deg/ tool Corr - (ft) (deg) (deg) (ft) (ft) (ft) (ft) (ft) (ft) (deg) 100f) type (deg) 151 12470.89 37.18 15.35 31.68 8284.09 686.15 5690.33 4719.96 7393.09 39.67 9.18 SLB_MWD +GMAG 152 12503.45 40.47 13.47 32.56 8309.46 696.55 5710.10 4725.02 7411.55 39.61 10.73 SLB_MWD +GMAG 153 12534.30 39.83 12.73 30.85 8333.04 707.06 5729.47 4729.53 7429.35 39.54 2.59 SLB_MWD +GMAG 154 12567.14 41.78 8.81 32.84 8357.90 719.14 5750.54 4733.53 7448.16 39.46 9.80 SLB_MWD +GMAG • 155 12598.01 45.60 7.12 30.87 8380.21 731.98 5771.66 4736.47 7466.34 39.37 12.94 SLB MWD +GMAG 156 12629.48 45.23 7.03 31.47 8402.31 745.76 5793.90 4739.23 7485.29 39.28 1.19 SLB_MWD +GMAG 157 12661.36 47.37 4.19 31.88 8424.33 760.39 5816.83 4741.47 7504.47 39.18 9.30 SLB_MWD +GMAG 158 12692.54 51.10 1.51 31.18 8444.69 776.24 5840.41 4742.63 7523.50 39.08 13.62 SLB_MWD +GMAG 159 12723.54 50.73 1.56 31.00 8464.24 792.80 5864.47 4743.28 7542.59 38.97 1.20 SLB_MWD +GMAG 160 12755.41 50.67 1.34 31.87 8484.42 809.79 5889.12 4743.90 7562.17 38.85 0.57 SLB MWD +GMAG 161 12787.08 53.01 1.18 31.67 8503.99 827.01 5914.02 4744.45 7581.91 38.74 7.40 SLB_MWD +GMAG 162 12818.21 58.28 0.83 31.13 8521.55 844.85 5939.70 4744.90 7602.24 38.62 16.95 SLB_MWD +GMAG 163 12850.06 59.27 1.28 31.85 8538.06 863.75 5966.93 4745.40 7623.85 38.49 3.33 SLB_MWD +GMAG 164 12881.58 62.72 359.99 31.52 8553.34 883.03 5994.49 4745.70 7645.63 38.37 11.52 SLB_MWD +GMAG 165 12912.00 66.73 359.42 30.42 8566.33 902.58 6022.00 4745.55 7667.12 38.24 13.29 SLB MWD +GMAG 166 12938.02 66.96 0.31 26.02 8576.56 919.53 6045.92 4745.50 7685.89 38.13 3.27 SLB_MWD +GMAG 167 12969.25 62.70 358.81 31.23 8589.84 939.66 6074.18 4745.29 7708.01 38.00 14.32 SLB_MWD +GMAG 168 13000.02 65.52 355.30 30.77 8603.28 960.21 6101.81 4743.85 7728.92 37.86 13.76 SLB_MWD +GMAG 169 13032.34 68.81 354.07 32.32 8615.82 983.14 6131.46 4741.09 7750.67 37.71 10.77 SLB_MWD +GMAG 170 13062.36 72.07 353.91 30.02 8625.87 1005.12 6159.59 4738.13 7771.13 37.57 10.87 SLB MWD +GMAG • 171 13092.77 75.99 351.48 30.41 8634.23 1028.25 6188.58 4734.41 7791.87 37.42 15.01 SLB_MWD +GMAG 172 13124.60 78.73 351.17 31.83 8641.20 1053.27 6219.28 4729.72 7813.43 37.25 8.66 SLB_MWD +GMAG 173 13156.96 79.16 351.10 32.36 8647.40 1078.92 6250.66 4724.83 7835.48 37.09 1.35 SLB_MWD +GMAG 174 13187.96 79.46 351.23 31.00 8653.15 1103.52 6280.76 4720.15 7856.71 36.93 1.05 SLB_MWD +GMAG 175 13219.79 79.60 351.18 31.83 8658.94 1128.77 6311.70 4715.36 7878.59 36.76 0.47 SLB MWD +GMAG 176 13251.13 79.81 350.82 31.34 8664.54 1153.72 6342.15 4710.54 7900.13 36.60 1.31 SLB_MWD +GMAG 177 13281.94 80.23 351.08 30.81 8669.88 1178.28 6372.12 4705.77 7921.37 36.45 1.60 SLB_MWD +GMAG 178 13313.77 80.65 350.25 31.83 8675.16 1203.78 6403.09 4700.68 7943.29 36.28 2.89 SL3_MWD +GMAG 179 13345.09 82.69 346.74 31.32 8679.70 1229.62 6433.45 4694.49 7964.14 36.12 12.86 SLB_MWD +GMAG 180 13377.35 85.00 343.95 32.26 8683.16 1257.30 6464.47 4686.38 7984.46 35.94 11.19 SLB MWD +GMAG SCHLUMBERGER Survey Report 4- Apr -2010 16:42:39 Page 8 of 10 Seq Measured Incl Azimuth Course TVD Vertical Displ Displ Total At DLS Srvy Tool depth angle angle length depth section +N /S- +E /W- displ Azim (deg/ tool Corr - (ft) (deg) (deg) (ft) (ft) (ft) (ft) (ft) (ft) (deg) 100f) type (deg) 181 13408.41 88.37 343.71 31.06 8684.96 1284.46 6494.25 4677.75 8003.54 35.76 10.88 SLB MWD +GMAG 182 13438.41 89.57 341.54 30.00 8685.50 1311.03 6522.88 4668.79 8021.56 35.59 8.26 SLB__ MWD +GMAG 183 13470.04 90.60 337.36 31.63 8685.45 1339.82 6552.49 4657.69 8039.23 35.41 13.61 SLB_MWD +GMAG 184 13502.40 90.70 335.04 32.36 8685.08 1369.99 6582.09 4644.63 8055.84 35.21 7.18 SLB_MWD +GMAG • 185 13533.19 89.98 332.40 30.79 8684.90 1399.14 6609.69 4631.00 8070.58 35.02 8.89 SLB_MWD +GMAG 186 13563.74 89.95 329.44 30.55 8684.92 1428.52 6636.39 4616.15 8083.97 34.82 9.69 SLB_MWD +GMAG 187 13596.88 88.99 326.45 33.14 8685.23 1460.81 6664.47 4598.57 8097.04 34.61 9.48 SLB_MWD +GMAG 188 13627.49 89.05 324.07 30.61 8685.75 1490.92 6689.62 4581.13 8107.88 34.40 7.78 SLB_MWD +GMAG 189 13659.31 88.40 320.06 31.82 8686.46 1522.49 6714.71 4561.58 8117.59 34.19 12.76 SLB_MWD +GMAG 190 13691.29 88.13 316.47 31.98 8687.43 1554.40 6738.56 4540.30 8125.42 33.97 11.25 SLB MWD +GMAG 191 13723.25 88.68 314.68 31.96 8688.32 1586.34 6761.37 4517.94 8131.91 33.75 5.86 SLB_MWD +GMAG 192 13754.62 88.41 314.52 31.37 8689.11 1617.70 6783.39 4495.61 8137.87 33.53 1.00 SLB_MWD +GMAG 193 13786.47 88.40 314.87 31.85 8690.00 1649.54 6805.78 4472.98 8144.09 33.31 1.10 SLBMWD +GMAG 194 13818.22 88.92 316.22 31.75 8690.74 1681.28 6828.44 4450.75 8150.87 33.10 4.56 SLB__MWD +GMAG 195 13848.67 88.78 316.05 30.45 8691.35 1711.71 6850.39 4429.65 8157.80 32.89 0.72 SLB MWD +GMAG 196 13880.05 87.51 314.75 31.38 8692.37 1743.08 6872.72 4407.63 8164.65 32.67 5.79 SLB_MWD +GMAG 197 13911.90 87.08 313.05 31.85 8693.87 1774.88 6894.78 4384.71 8170.90 32.45 5.50 SLB_MWD +GMAG 198 13942.36 88.61 309.32 30.46 8695.02 1805.25 6914.82 4361.81 8175.58 32.24 13.23 SLB_MWD +GMAG 199 13974.80 90.70 306.49 32.44 8695.21 1837.43 6934.74 4336.21 8178.84 32.02 10.84 SLB_MWD +GMAG 200 14006.47 92.59 305.24 31.67 8694.30 1868.69 6953.29 4310.56 8181.03 31.80 7.15 SLB MWD +GMAG • 201 14037.35 92.52 305.43 30.88 8692.93 1899.10 6971.13 4285.40 8182.99 31.58 0.66 SLB_MWD +GMAG 202 14068.90 90.73 304.51 31.55 8692.03 1930.15 6989.21 4259.55 8184.91 31.36 6.38 SLB_MWD +GMAG 203 14101.05 90.01 305.48 32.15 8691.82 1961.81 7007.64 4233.22 8187.01 31.14 3.76 SLB_MWD +GMAG 204 14130.95 90.05 304.72 29.90 8691.81 1991.27 7024.84 4208.75 8189.14 30.93 2.55 SLB_MWD +GMAG 205 14163.04 90.08 305.26 32.09 8691.77 2022.87 7043.24 4182.46 8191.47 30.70 1.69 SLB MWD +GMAG 206 14193.71 89.77 305.65 30.67 8691.81 2053.11 7061.03 4157.48 8194.07 30.49 1.62 SLB_MWD +GMAG 207 14224.74 90.36 304.35 31.03 8691.78 2083.67 7078.83 4132.06 8196.57 30.27 4.60 SLB_MWD +GMAG 208 14256.85 90.43 304.29 32.11 8691.55 2115.22 7096.93 4105.54 8198.90 30.05 0.29 SLB_MWD +GMAG 209 14288.38 90.01 304.57 31.53 8691.43 2146.22 7114.76 4079.54 8201.37 29.83 1.60 SLB_MWD +GMAG 210 14318.54 90.08 304.19 30.16 8691.41 2175.86 7131.79 4054.65 8203.81 29.62 1.28 SLB MWD +GMAG SCHLUMBERGER Survey Report 4- Apr -2010 16:42:39 Page 9 of 10 Seq Measured Incl Azimuth Course TVD Vertical Displ Displ Total At DLS Srvy Tool depth angle angle length depth section +N /S- +E /W- displ Azim (deg/ tool Corr - (ft) (deg) (deg) (ft) (ft) (ft) (ft) (ft) (ft) (deg) 100f) type (deg) 211 14350.21 90.05 305.53 31.67 8691.37 2207.04 7149.89 4028.66 8206.77 29.40 4.23 SLB_MWD +GMAG 212 14382.56 89.95 305.98 32.35 8691.37 2238.97 7168.79 4002.41 8210.41 29.18 1.43 SLB_MWD +GMAG 213 14413.67 89.84 305.69 31.11 8691.43 2269.68 7187.00 3977.19 8214.08 28.96 1.00 SLB_MWD +G4AG 214 14444.30 89.77 306.47 30.63 8691.54 2299.94 7205.04 3952.43 8217.93 28.75 2.56 SLB_MWD +GMAG • 215 14475.04 89.50 304.86 30.74 8691.73 2330.27 7222.96 3927.46 8221.69 28.53 5.31 SLBMWD +GMAG 216 14506.94 91.90 302.28 31.90 8691.34 2361.53 7240.60 3900.89 8224.55 28.31 11.05 SLBMWD +GMAG 217 14538.71 92.38 302.48 31.77 8690.16 2392.51 7257.60 3874.07 8226.86 28.09 1.64 SLB_MWD +GMAG 218 14570.27 92.69 301.27 31.56 8688.76 2423.21 7274.25 3847.30 8229.00 27.87 3.95 SLB_MWD +GMAG 219 14602.04 94.00 300.86 31.77 8686.91 2454.00 7290.62 3820.13 8230.83 27.65 4.32 SLB_MWD +GMAG 220 14633.44 93.00 300.45 31.40 8684.99 2484.36 7306.60 3793.17 8232.53 27.44 3.44 SLB MWD +GMAG 221 14665.09 92.48 299.91 31.65 8683.48 2514.92 7322.49 3765.84 8234.10 27.22 2.37 SLB_MWD +GMAG 222 14695.33 92.48 299.65 30.24 8682.17 2544.07 7337.49 3739.62 8235.51 27.01 0.86 SLB_MWD +GMAG 223 14727.20 92.93 299.45 31.87 8680.66 2574.76 7353.19 3711.93 8236.98 26.78 1.54 SLB_MWD +GMAG 224 14758.38 92.69 299.11 31.18 8679.14 2604.74 7368.43 3684.77 8238.40 26.57 1.33 SLB_MWD +GMAG 225 14788.92 92.86 298.34 30.54 8677.66 2634.02 7383.09 3658.02 8239.60 26.36 2.58 SLB MWD +GMAG 226 14821.09 93.55 298.08 32.17 8675.86 2664.77 7398.27 3629.71 8240.70 26.13 2.29 SLB_MWD +GMAG 227 14853.20 93.72 299.20 32.11 8673.82 2695.52 7413.63 3601.59 8242.17 25.91 3.52 SLB_MWD +GMAG 228 14883.93 93.24 300.02 30.73 8671.96 2725.09 7428.78 3574.92 8244.20 25.70 3.09 SLB_MWD +GMAG 229 14915.71 92.79 299.66 31.78 8670.29 2755.72 7444.58 3547.39 8246.56 25.48 1.81 SLB_MWD +GMAG 230 14947.02 92.31 299.98 31.31 8668.89 2785.91 7460.13 3520.25 8248.98 25.26 1.84 SLB MWD +GMAG • 231 14978.92 91.97 300.19 31.90 8667.70 2816.71 7476.11 3492.67 8251.72 25.04 1.25 SLB_MWD +G4AG 232 15011.17 91.73 300.47 32.25 8666.66 2847.89 7492.39 3464.85 8254.76 24.82 1.14 SLB_MWD +GMAG 233 15042.20 92.48 299.16 31.03 8665.52 2877.82 7507.80 3437.95 8257.52 24.60 4.86 SLB_MWD +GMAG 234 15074.05 92.65 299.63 31.85 8664.09 2908.46 7523.42 3410.22 8260.24 24.38 1.57 SLB_MWD +GMAG 235 15106.56 93.72 298.39 32.51 8662.29 2939.67 7539.16 3381.84 8262.92 24.16 5.03 SLB MWD +GMAG 236 15138.44 94.44 298.93 31.88 8660.02 2970.18 7554.41 3353.93 8265.47 23.94 2.82 SLB_MWD +GMAG 237 15167.76 93.89 299.13 29.32 8657.89 2998.30 7568.60 3328.37 8268.12 23.74 2.00 SLB_MWD +GMAG 238 15200.34 94.24 299.19 32.58 8655.58 3029.56 7584.44 3299.99 8271.25 23.51 1.09 SLB_MWD +GMAG 239 15231.19 94.28 298.43 30.85 8653.29 3059.10 7599.26 3273.03 8274.15 23.30 2.46 SLBMWD +GMAG 240 15262.11 93.76 298.61 30.92 8651.12 3088.68 7613.99 3245.93 8277.01 23.09 1.78 SLB_MWD +GMAG • , . SCHLUMBERGER Survey Report 4-Apr-2010 16:42:39 Page 10 of 10 Seq Measured Incl Azimuth Course TVD Vertical Displ Displ Total At DLS Srvy Tool depth angle angle length depth section +N/S- +E/W- displ Azim (deg/ tool Corr (ft) (deg) (deg) (ft) (ft) (ft) (ft) (ft) (ft) (deg) 100f) type (deg) 241 15294.12 93.82 299.04 32.01 8649.00 3119.36 7629.39 3217.95 8280.26 22.87 1.35 SLB_MWD+GMAG 242 15326.27 94.96 300.86 32.15 8646.54 3150.31 7645.39 3190.17 8284.28 22.65 6.67 SLB_MWD+GMAG 243 15356.29 93.97 301.78 30.02 8644.21 3179.39 7660.95 3164.61 8288.84 22.44 4.50 SLB MWD+GMAG 244 15388.19 90.83 300.69 31.90 8642.87 3210.34 7677.47 3137.36 8293.77 22.23 10.42 SLB_MWD+GMAG 4 11 245 15420.81 90.46 300.16 32.62 8642.50 3241.91 7693.99 3109.23 8298.48 22.00 1.98 SLB_MWD+GMAG 246 15452.58 90.15 300.95 31.77 8642.33 3272.68 7710.14 3081.87 8303.27 21.79 2.67 SLB_MWD+GMAG 247 15484.18 89.78 300.64 31.60 8642.35 3303.31 7726.32 3054.73 8308.27 21.57 1.53 SLB_MWD+GMAG 248 15516.17 90.66 300.20 31.99 8642.23 3334.27 7742.52 3027.14 8313.25 21.35 3.08 SLB_MWD+GMAG 249 15546.67 90.36 300.51 30.50 8641.96 3363.78 7757.93 3000.83 8318.08 21.15 1.41 SLB_MWD+GMAG 250 15577.63 90.32 301.28 30.96 8641.78 3393.80 7773.83 2974.26 8323.38 20.94 2.49 SLBMWD+GMAG 251 15634.00 90.32 301.28 56.37 8641.46 3448.56 7803.10 2926.09 8333.68 20.56 0.00 SLBBLIND • r SCHLUMBERGER Survey report 1- Apr -2010 10:19:05 Page 1 of 7 Client • BPXA Field • Prudhoe Bay Unit - EOA Well • 15- 16BPB1 Spud date • 18- Mar -10 API number • 50- 029 - 21115 -70 Last survey date • 01- Apr -10 Engineer • S. Ziadeh Total accepted surveys...: 175 MD of first survey 0.00 ft El i RIG• • Nabors 7ES MD of last survey • 13240.00 ft STATE • Alaska Survey calculation methods Geomagnetic data Method for positions • Minimum curvature Magnetic model • BGGM version 2009 Method for DLS • Mason & Taylor Magnetic date • 25- Mar -2010 Magnetic field strength..: 57689.70 GAMA Depth reference Magnetic dec ( +E /W -) 22.31 degrees Permanent datum • Mean Sea Level Magnetic dip 80.95 degrees Depth reference • Driller's Depth GL above permanent 32.80 ft MWD survey Reference Criteria ‹) KB above permanent • Top Drive Reference G 1002.68 mGal DF above permanent 61.00 ft Reference H 57689.50 GAMA 1 1 Reference Dip 80.95 degrees Vertical section origin Tolerance of G • ( + / -) 2.50 mGal 1 Latitude ( +N /S -) 0.00 ft Tolerance of H • ( +/- )300.00 GAMA Departure ( +E /W -) 0.00 ft Tolerance of Dip • ( + / -) 0.45 degrees Platform reference point Corrections ID Latitude ( +N /S -) • - 999.25 ft Magnetic dec ( +E /W -) 22.31 degrees Departure ( +E /W -) • - 999.25 ft Grid convergence ( +E /W -).: 0.00 degrees Total az corr ( +E /W -) 22.31 degrees Azimuth from Vsect Origin to target: 38.00 degrees (Total az corr = magnetic dec - grid conv) Survey Correction Type : I =Sag Corrected Inclination M= Schlumberger Magnetic Correction S =Shell Magnetic Correction F= Failed Axis Correction R= Magnetic Resonance Tool Correction D =Dmag Magnetic Correction SCHLUMBERGER Survey Report 1- Apr -2010 10:19:05 Page 2 of 7 Seq Measured Incl Azimuth Course TVD Vertical Displ Displ Total At DLS Srvy Tool # depth angle angle length depth section +N /S- +E /W- displ Azim (deg/ tool Corr - (ft) (deg) (deg) (ft) (ft) (ft) (ft) (ft) (ft) (deg) 100f) type (deg) 1 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 TIP 2 30.00 0.00 0.00 30.00 30.00 0.00 0.00 0.00 0.00 0.00 0.00 SLB_DEPTHONLY 3 90.00 0.37 179.86 60.00 90.00 -0.15 -0.19 0.00 0.19 179.86 0.62 SLB_CNSG +CASING 4 190.00 0.43 158.08 100.00 190.00 -0.59 -0.86 0.14 0.88 170.72 0.16 SLB_CNSG +CASING 5 290.00 0.36 180.27 100.00 289.99 -1.03 -1.53 0.28 1.55 169.61 0.17 SLB_CNSG +CASING III 390.00 0.51 168.24 100.00 389.99 -1.57 -2.28 0.37 2.31 170.79 0.17 SLB_CNSG +CASING 7 490.00 0.43 179.07 100.00 489.99 -2.15 -3.09 0.47 3.12 171.42 0.12 SLB_CNSG +CASING 8 590.00 0.49 164.12 100.00 589.99 -2.69 -3.87 0.59 3.92 171.35 0.13 SLB_CNSG +CASING 9 690.00 0.41 178.64 100.00 689.98 -3.22 -4.64 0.71 4.70 171.25 0.14 SLB_CNSG +CASING 10 790.00 0.12 121.30 100.00 789.98 -3.48 -5.06 0.81 5.12 170.87 0.36 SLB CNSG +CASING 11 890.00 0.37 81.65 100.00 889.98 -3.24 -5.06 1.22 5.21 166.44 0.29 SLB_CNSG +CASING 12 990.00 0.43 85.77 100.00 989.98 -2.75 -4.99 1.92 5.34 159.00 0.07 SLB_CNSG +CASING 13 1090.00 0.32 93.93 100.00 1089.98 -2.34 -4.98 2.57 5.60 152.72 0.12 SLB_CNSG +CASING 14 1190.00 0.30 72.48 100.00 1189.97 -1.97 -4.92 3.10 5.81 147.82 0.12 SLB_CNSG +CASING 15 1290.00 0.40 81.01 100.00 1289.97 -1.50 -4.79 3.69 6.04 142.37 0.11 SLB CNSG +CASING 16 1390.00 0.40 115.46 100.00 1389.97 -1.17 -4.88 4.35 6.54 138.30 0.24 SLB_CNSG +CASING 17 1490.00 0.31 96.64 100.00 1489.97 -0.95 -5.06 4.93 7.07 135.74 0.15 SLB_CNSG +CASING 18 1590.00 0.46 131.91 100.00 1589.97 -0.84 -5.36 5.50 7.68 134.27 0.27 SLB_CNSG +CASING 19 1690.00 0.41 126.75 100.00 1689.96 -0.86 -5.85 6.09 8.44 133.84 0.06 SLB_CNSG +CASING 20 1790.00 0.28 164.95 100.00 1789.96 -1.00 -6.30 6.44 9.00 134.36 0.26 SLB CNSG +CASING 21 1890.00 0.34 163.56 100.00 1889.96 -1.32 -6.82 6.58 9.48 135.99 0.06 SLBCNSG +CASING 22 1990.00 0.53 67.10 100.00 1989.96 -1.09 -6.92 7.09 9.91 134.29 0.66 SLB_CNSG +CASING 23 2090.00 0.64 69.28 100.00 2089.95 -0.20 -6.54 8.04 10.37 129.13 0.11 SLB_CNSG +CASING 24 2190.00 0.60 82.25 100.00 2189.95 0.65 -6.27 9.08 11.04 124.63 0.15 SLB_ CNSG +CASING 25 2290.00 0.86 153.02 100.00 2289.94 0.71 -6.87 9.94 12.09 124.65 0.87 SLBCNSG +CASING 26 2390.00 0.96 160.89 100.00 2389.93 -0.07 -8.33 10.56 13.45 128.28 0.16 SLB_ CNSG +CASING 27 2485.00 0.89 153.98 95.00 2484.91 -0.82 -9.75 11.14 14.80 131.18 0.14 SLB_CNSG +CASING 28 2490.00 0.89 153.59 5.00 2489.91 -0.86 -9.82 11.18 14.88 131.30 0.12 SLB_CNSG +CASING 29 2590.00 1.43 24.44 100.00 2589.90 0.02 -9.38 12.04 15.26 127.92 2.11 SLB_CNSG +CASING 30 2690.00 4.99 19.36 100.00 2689.73 5.36 -4.14 14.00 14.60 106.46 3.57 SLB CNSG +CASING SCHLUMBERGER Survey Report 1- Apr -2010 10:19:05 Page 3 of 7 Seq Measured Incl Azimuth Course TVD Vertical Displ Displ Total At DLS Srvy Tool # depth angle angle length depth section +N /S- +E /W- displ Azim (deg/ tool Corr - (ft) (deg) (deg) (ft) (ft) (ft) (ft) (ft) (ft) (deg) 100f) type (deg) 31 2790.00 6.55 12.61 100.00 2789.22 14.63 5.53 16.68 17.58 71.65 1.70 SLB_CNSG +CASING 32 2890.00 8.25 7.65 100.00 2888.39 25.98 18.21 18.88 26.24 46.04 1.81 SLB CNSG +CASING 33 2990.00 9.99 13.86 100.00 2987.12 40.09 33.74 21.92 40.24 33.00 2.00 SLB - CNSG +CASING 34 3090.00 11.39 28.91 100.00 3085.40 57.76 50.81 28.77 58.39 29.52 3.11 SLB CNSG +CASING 35 3190.00 12.85 35.21 100.00 3183.18 78.61 68.54 39.96 79.34 30.24 1.97 SLB CNSG +CASING 36 3290.00 13.38 25.23 100.00 3280.58 101.01 88.10 51.30 101.95 30.21 2.32 SLB_CNSG +CASING 37 3340.00 14.04 24.08 50.00 3329.15 112.54 98.87 56.24 113.75 29.63 1.43 SLB_CNSG +CASING 38 3390.00 14.79 23.96 50.00 3377.58 124.62 110.24 61.31 126.14 29.08 1.50 SLB_CNSG +CASING 39 3440.00 15.54 24.87 50.00 3425.84 137.33 122.15 66.72 139.18 28.64 1.57 SLB_CNSG +CASING 40 3490.00 16.40 26.22 50.00 3473.91 150.76 134.56 72.65 152.92 28.37 1.87 SLB CNSG +CASING 41 3540.00 17.20 27.38 50.00 3521.77 164.94 147.45 79.17 167.37 28.23 1.73 SLB_CNSG +CASING 42 3590.00 18.81 29.52 50.00 3569.33 180.18 161.03 86.54 182.82 28.25 3.48 SLB_CNSG +CASING 43 3640.00 20.34 30.37 50.00 3616.43 196.77 175.55 94.91 199.56 28.40 3.11 SLB_CNSG +CASING 44 3690.00 21.45 31.12 50.00 3663.15 214.46 190.87 104.03 217.38 28.59 2.28 SLB_CNSG +CASING 45 3740.00 22.83 31.56 50.00 3709.46 233.17 206.96 113.83 236.20 28.81 2.78 SLB CNSG +CASING 46 3790.00 24.12 31.76 50.00 3755.32 252.97 223.92 124.29 256.10 29.03 2.58 SLB_CNSG +CASING 47 3840.00 25.64 31.75 50.00 3800.68 273.88 241.80 135.36 277.11 29.24 3.04 SLB_CNSG +CASING 48 3890.00 27.86 31.39 50.00 3845.32 296.24 260.98 147.14 299.60 29.41 4.45 SLB CNSG +CASING 49 3940.00 29.43 31.59 50.00 3889.20 320.05 281.42 159.66 323.55 29.57 3.15 SLB - CNSG +CASING 50 3990.00 31.04 31.61 50.00 3932.40 345.07 302.86 172.85 348.71 29.71 3.22 SLB CNSG +CASING 51 4040.00 32.33 31.79 50.00 3974.95 371.18 325.20 186.65 374.96 29.85 2.59 SLB_CNSG +CASING 52 4090.00 33.53 32.30 50.00 4016.91 398.21 348.24 201.07 402.12 30.00 2.46 SLB_CNSG +CASING 53 4140.00 34.98 32.84 50.00 4058.24 426.23 371.96 216.22 430.24 30.17 2.96 SLB_CNSG +CASING 54 4190.00 36.31 33.17 50.00 4098.87 455.25 396.39 232.10 459.34 30.35 2.69 SLB_CNSG +CASING 55 4240.00 38.51 33.62 50.00 4138.58 485.53 421.75 248.82 489.67 30.54 4.43 SLB CNSG +CASING 56 4290.00 40.39 33.70 50.00 4177.19 517.21 448.19 266.43 521.40 30.73 3.76 SLB_CNSG +CASING 57 4340.00 42.01 33.81 50.00 4214.81 550.05 475.57 284.73 554.29 30.91 3.24 SLB_CNSG +CASING 58 4390.00 43.50 33.74 50.00 4251.52 583.90 503.78 303.59 588.19 31.07 2.98 SLB_CNSG +CASING 59 4440.00 44.46 33.81 50.00 4287.50 618.53 532.64 322.90 622.87 31.22 1.92 SLB_CNSG +CASING 60 4490.00 45.45 33.90 50.00 4322.88 653.76 561.98 342.58 658.17 31.37 1.98 SLB CNSG +CASING SCHLUMBERGER Survey Report 1- Apr -2010 10:19:05 Page 4 of 7 Seq Measured Incl Azimuth Course TVD Vertical Displ Displ Total At DLS Srvy Tool depth angle angle length depth section +N /S- +E /W- displ Azim (deg/ tool Corr (ft) (deg) (deg) (ft) (ft) (ft) (ft) (ft) (ft) (deg) 100f) type (deg) 61 4540.00 47.24 34.25 50.00 4357.40 689.85 591.94 362.85 694.30 31.51 3.62 SLB_CNSG +CASING 62 4587.00 49.09 34.55 47.00 4388.74 724.80 620.84 382.63 729.28 31.65 3.96 SLB_BLIND 63 4604.00 49.90 37.00 17.00 4399.79 737.71 631.32 390.19 742.17 31.72 11.95 SLB_BLIND 64 4626.54 49.22 38.00 22.54 4414.41 754.86 644.93 400.63 759.24 31.85 4.53 SLB_MWD_INC +Trend 65 4720.47 51.78 43.80 93.93 4474.18 827.19 699.62 448.10 830.82 32.64 5.49 SLB_MWD_INC +Trend 66 4813.93 56.37 48.05 93.46 4529.02 902.08 752.17 502.49 904.58 33.74 6.14 SLB_MWD +GMAG 67 4906.86 59.65 44.78 92.93 4578.25 980.03 806.52 559.53 981.61 34.75 4.62 SLB_MWD +GMAG 68 5003.33 62.85 48.04 96.47 4624.66 1063.67 864.79 620.80 1064.55 35.67 4.45 SLB_MWD +GMAG 69 5096.00 65.42 41.60 92.67 4665.11 1146.40 923.93 679.49 1146.89 36.33 6.84 SLB_MWD +GMAG 70 5193.19 66.05 41.60 97.19 4705.05 1234.83 990.19 738.32 1235.15 36.71 0.65 SLB MWD +GMAG 71 5286.33 66.86 41.77 93.14 4742.26 1320.04 1053.95 795.10 1320.23 37.03 0.89 SLB_MWD +GMAG 72 5378.55 66.00 40.77 92.22 4779.14 1404.43 1117.48 850.86 1404.54 37.29 1.36 SLB_MWD +GMAG 73 5472.62 64.46 39.04 94.07 4818.55 1489.79 1182.99 905.65 1489.86 37.44 2.34 SLB_MWD +GMAG 74 5570.80 65.40 38.90 98.18 4860.15 1578.70 1252.13 961.58 1578.76 37.52 0.97 SLB_MWD +GMAG 75 5666.46 63.33 38.54 95.66 4901.54 1664.94 1319.42 1015.53 1664.98 37.58 2.19 SLB MWD +GMAG 76 5757.98 63.20 38.03 91.52 4942.71 1746.67 1383.58 1066.17 1746.71 37.62 0.52 SLB_MWD +GMAG 77 5852.93 63.06 39.82 94.95 4985.63 1831.35 1449.47 1119.38 1831.38 37.68 1.69 SLBMWD +GMAG 78 5947.04 63.90 43.51 94.11 5027.66 1915.37 1512.35 1175.35 1915.37 37.85 3.62 SLB__MWD +GMAG 79 6041.27 64.55 44.66 94.23 5068.63 1999.74 1573.30 1234.39 1999.75 38.12 1.30 SLB_MWD +GMAG 80 6136.26 64.38 47.07 94.99 5109.58 2084.64 1632.98 1295.90 2084.70 38.43 2.30 SLB MWD +GMAG 81 6230.93 65.05 46.45 94.67 5150.02 2169.24 1691.62 1358.26 2169.43 38.76 0.92 SLBMWD +GMAG 82 6259.71 65.49 46.48 28.78 5162.06 2195.10 1709.63 1377.21 2195.34 38.85 1.53 SLB__MWD +GMAG 83 6318.80 67.15 45.22 59.09 5185.79 2248.70 1747.32 1416.03 2249.06 39.02 3.42 SLB_MWD +GMAG 84 6368.92 63.86 46.23 50.12 5206.57 2293.89 1779.16 1448.68 2294.35 39.15 6.82 SLB_MWD +GMAG 85 6410.76 61.23 46.69 41.84 5225.86 2330.61 1804.73 1475.59 2331.18 39.27 6.36 SLB MWD +GMAG 86 6504.67 61.20 47.28 93.91 5271.08 2411.91 1860.88 1535.77 2412.77 39.53 0.55 SLB_MWD +GMAG 87 6596.18 61.28 48.08 91.51 5315.11 2490.98 1914.89 1595.08 2492.21 39.79 0.77 SLB_MWD +GMAG 88 6699.05 61.46 47.28 102.87 5364.40 2579.99 1975.68 1661.84 2581.67 40.07 0.70 SLB_MWD +GMAG 89 6796.68 61.11 47.94 97.63 5411.31 2664.41 2033.41 1725.08 2666.58 40.31 0.69 SLB_MWD +GMAG 90 6886.49 61.53 47.54 89.81 5454.41 2742.07 2086.39 1783.39 2744.73 40.52 0.61 SLB MWD +GMAG SCHLUMBERGER Survey Report 1- Apr -2010 10:19:05 Page 5 of 7 Seq Measured Incl Azimuth Course TVD Vertical Displ Displ Total At DLS Srvy Tool depth angle angle length depth section +N /S- +E /W- displ Azim (deg/ tool Corr - (ft) (deg) (deg) (ft) (ft) (ft) (ft) (ft) (ft) (deg) 100f) type (deg) 91 6980.91 60.83 46.42 94.42 5499.93 2823.77 2142.83 1843.87 2826.94 40.71 1.28 SLB_MWD +GMAG 92 7075.82 62.24 46.48 94.91 5545.16 2906.30 2200.31 1904.34 2909.97 40.88 1.49 SLB_MWD +GMAG 93 7170.28 61.35 44.92 94.46 5589.81 2988.79 2258.45 1963.92 2992.92 41.01 1.73 SLB_MWD +GMAG 94 7264.26 61.13 43.53 93.98 5635.03 3070.69 2317.48 2021.38 3075.18 41.10 1.32 SLB_MWD +GMAG 95 7357.92 64.10 44.99 93.66 5678.10 3153.34 2377.02 2079.43 3158.20 41.18 3.46 SLBMWD +GMAG • 96 7453.73 66.20 45.16 95.81 5718.36 3239.62 2438.41 2140.98 3244.94 41.28 2.20 SLB_MWD +GMAG 97 7548.68 66.40 45.16 94.95 5756.53 3325.88 2499.72 2202.63 3331.69 41.38 0.21 SLB_MWD +GMAG 98 7643.91 66.66 45.51 95.23 5794.46 3412.52 2561.12 2264.76 3418.84 41.49 0.43 SLB_MWD +GMAG 99 7734.70 66.23 45.30 90.79 5830.74 3495.05 2619.55 2324.02 3501.88 41.58 0.52 SLB_MWD +GMAG 100 7829.73 66.95 45.54 95.03 5868.49 3581.52 2680.77 2386.13 3588.89 41.67 0.79 SLB MWD +GMAG 101 7924.91 66.18 45.79 95.18 5906.35 3668.07 2741.80 2448.60 3676.01 41.77 0.84 SLB_MWD +GMAG 102 8022.53 66.32 45.30 97.62 5945.66 3756.65 2804.37 2512.38 3765.17 41.86 0.48 SLBMWD +GMAG 103 8116.99 65.94 44.40 94.46 5983.89 3842.41 2865.61 2573.30 3851.44 41.92 0.96 SLB__MWD +GMAG 104 8210.59 65.92 43.97 93.60 6022.06 3927.38 2926.89 2632.86 3936.83 41.97 0.42 SLB_MWD +GMAG 105 8303.68 66.06 43.13 93.09 6059.94 4012.01 2988.53 2691.45 4021.84 42.01 0.84 SLB MWD +GMAG 106 8397.95 65.51 42.44 94.27 6098.61 4097.69 3051.62 2749.85 4107.80 42.02 0.89 SLB_MWD +GMAG 107 8490.59 65.38 41.74 92.64 6137.11 4181.73 3114.15 2806.33 4192.06 42.02 0.70 SLB_MWD +GMAG 108 8584.52 65.53 39.71 93.93 6176.13 4267.07 3178.90 2862.07 4277.48 42.00 1.97 SLB_MWD +GMAG 109 8678.96 65.55 38.62 94.44 6215.24 4353.02 3245.55 2916.36 4363.34 41.94 1.05 SLBMWD +GMAG 110 8776.77 65.64 38.11 97.81 6255.65 4442.08 3315.39 2971.64 4452.24 41.87 0.48 SLB _ MWD +GMAG 111 8872.08 65.77 39.26 95.31 6294.86 4528.95 3383.19 3025.94 4538.98 41.81 1.11 SLB_MWD +GMAG 112 8966.07 65.72 40.92 93.99 6333.48 4614.58 3448.75 3081.12 4624.63 41.78 1.61 SLB_MWD +GMAG 113 9059.53 65.45 41.68 93.46 6372.11 4699.54 3512.68 3137.29 4709.73 41.77 0.79 SLB_MWD +GMAG 114 9153.43 65.49 41.05 93.90 6411.09 4784.81 3576.80 3193.74 4795.15 41.76 0.61 SLB_MWD +GMAG 115 9247.90 65.39 40.28 94.47 6450.36 4870.65 3641.97 3249.73 4881.05 41.74 0.75 SLB MWD +GMAG 116 9343.13 65.39 39.26 95.23 6490.02 4957.18 3708.52 3305.11 4967.58 41.71 0.97 SLB_MWD +GMAG 117 9436.42 65.42 39.65 93.29 6528.85 5041.98 3774.01 3359.02 5052.34 41.67 0.38 SLB_MWD +GMAG 118 9531.09 65.49 39.44 94.67 6568.17 5128.06 3840.42 3413.85 5138.40 41.63 0.21 SLB_MWD +GMAG 119 9624.40 65.35 38.85 93.31 6606.99 5212.90 3906.23 3467.41 5223.17 41.59 0.59 SLBMWD +GMAG 120 9718.66 65.40 38.86 94.26 6646.26 5298.58 3972.95 3521.17 5308.77 41.55 0.05 SLB MWD +GMAG II 1 • SCHLUMBERGER Survey Report 1- Apr -2010 10:19:05 Page 6 of 7 Seq Measured Incl Azimuth Course TVD Vertical Displ Displ Total At DLS Srvy Tool depth angle angle length depth section +N /S- +E /W- displ Azim (deg/ tool Corr (ft) (deg) (deg) (ft) (ft) (ft) (ft) (ft) (ft) (deg) 100f) type (deg) • 121 9812.95 65.32 38.39 94.29 6685.57 5384.28 4039.91 3574.67 5394.36 41.50 0.46 SLB_MWD +GMAG 122 9908.17 65.45 39.06 95.22 6725.23 5470.84 4107.44 3628.82 5480.83 41.46 0.65 SLB_MWD +GMAG 123 10002.84 65.73 39.81 94.67 6764.36 5557.02 4174.03 3683.58 5566.98 41.43 0.78 SLB_MWD +GMAG 124 10097.24 66.79 41.45 94.40 6802.36 5643.33 4239.60 3739.85 5653.38 41.42 1.95 SLB_MWD +GMAG 125 10193.30 66.02 43.10 96.06 6840.82 5731.11 4304.73 3799.06 5741.39 41.43 1.77 SLBMWD +GMAG • 126 10286.68 65.22 45.46 93.38 6879.37 5815.65 4365.62 3858.43 5826.33 41.47 2.46 SLB_MWD +GMAG 127 10381.40 65.65 45.37 94.72 6918.74 5901.07 4426.10 3919.79 5912.28 41.53 0.46 SLB_MWD +GMAG 128 10476.11 65.93 45.43 94.71 6957.58 5986.73 4486.75 3981.29 5998.47 41.58 0.30 SLB_MWD +GMAG 129 10569.67 65.90 45.52 93.56 6995.76 6071.42 4546.64 4042.19 6083.69 41.64 0.09 SLB_MWD +GMAG 130 10664.13 65.90 45.38 94.46 7034.33 6156.92 4607.13 4103.64 6169.72 41.69 0.14 SLB MWD +GMAG 131 10757.63 63.84 44.46 93.50 7074.04 6240.95 4667.06 4163.41 6254.24 41.74 2.38 SLB_MWD +GMAG 132 10853.14 60.04 43.42 95.51 7118.96 6324.76 4727.73 4221.89 6338.44 41.77 4.09 SL3_4WD +GMAG 133 10947.88 57.26 40.47 94.74 7168.25 6405.45 4787.87 4275.98 6419.33 41.77 3.96 SLB_MWD +GMAG 134 11039.80 53.73 39.27 91.92 7220.32 6481.15 4845.99 4324.54 6495.02 41.75 3.99 SLB_MWD +GMAG 135 11135.27 51.98 36.23 95.47 7277.97 6557.23 4906.13 4371.14 6570.92 41.70 3.13 SLB MWD +GMAG 136 11228.64 51.31 33.78 93.37 7335.92 6630.34 4966.09 4413.14 6643.64 41.63 2.18 SLB_MWD +GMAG 137 11323.20 50.84 31.00 94.56 7395.33 6703.54 5028.20 4452.55 6716.25 41.53 2.34 SLB_MWD +GMAG 138 11417.12 49.15 29.95 93.92 7455.71 6774.86 5090.20 4489.04 6786.87 41.41 1.99 SLB_MWD +GMAG 139 11512.52 46.22 28.86 95.40 7519.93 6844.60 5151.63 4523.68 6855.88 41.29 3.19 SLB_MWD +GMAG 140 11607.94 43.19 28.33 95.42 7587.74 6910.82 5210.56 4555.81 6921.37 41.16 3.20 SLB MWD +GMAG 141 11700.55 40.75 26.16 92.61 7656.59 6971.65 5265.60 4584.18 6981.49 41.04 3.07 SLB_MWD +GMAG 142 11795.50 37.26 20.32 94.95 7730.39 7029.41 5320.40 4607.84 7038.39 40.89 5.33 SLB_MWD +GMAG 143 11890.04 33.52 15.98 94.54 7807.46 7080.90 5372.36 4624.98 7088.91 40.72 4.76 SLB_MWD +GMAG 144 11984.92 34.83 15.02 94.88 7885.96 7130.13 5423.72 4639.21 7137.16 40.54 1.49 SLB_MWD +GMAG 145 12079.57 34.93 14.55 94.65 7963.60 7179.88 5476.05 4653.02 7185.94 40.35 0.30 SLB MWD +GMAG 146 12173.85 35.46 17.28 94.28 8040.65 7230.22 5528.30 4667.93 7235.44 40.18 1.76 SLB_MWD +GMAG 147 12268.00 34.76 18.75 94.15 8117.67 7281.10 5579.79 4684.67 7285.61 40.02 1.17 SLB_MWD +GMAG 148 12335.13 34.68 17.99 67.13 8172.85 7317.12 5616.08 4696.72 7321.17 39.91 0.66 SLB_MWD +GMAG 149 12409.41 34.75 17.52 74.28 8233.91 7356.81 5656.36 4709.62 7360.36 39.78 0.37 SLB_MWD_INCONLY 150 12439.21 34.56 17.51 29.80 8258.42 7372.68 5672.52 4714.72 7376.05 39.73 0.64 SLB MWD +GMAG SCHLUMBERGER Survey Report 1- Apr -2010 10:19:05 Page 7 of 7 Seq Measured Incl Azimuth Course TVD Vertical Displ Displ Total At DLS Srvy Tool depth angle angle length depth section +N /S- +E /W- displ Azim (deg/ tool Corr - (ft) (deg) (deg) (ft) (ft) (ft) (ft) (ft) (ft) (deg) 100f) type (deg) 151 12470.89 37.18 15.35 31.68 8284.09 7389.93 5690.33 4719.96 7393.09 39.67 9.18 SLB_MWD +GMAG 152 12503.45 40.47 13.47 32.56 8309.46 7408.63 5710.10 4725.02 7411.55 39.61 10.73 SLB_MWD +GMAG 153 12534.30 39.83 12.73 30.85 8333.04 7426.67 5729.47 4729.53 7429.35 39.54 2.59 SLB_MWD +GMAG 154 12567.14 41.78 8.81 32.84 8357.90 7445.74 5750.54 4733.53 7448.16 39.46 9.80 SLB_MWD +GMAG 155 12598.01 45.60 7.12 30.87 8380.21 7464.19 5771.66 4736.47 7466.34 39.37 12.94 SLB MWD +GMAG • 156 12629.48 45.23 7.03 31.47 8402.31 7483.42 5793.90 4739.23 7485.29 39.28 1.19 SLB_MWD +GMAG 157 12661.36 47.37 4.19 31.88 8424.33 7502.87 5816.83 4741.47 7504.47 39.18 9.30 SLB_MWD +GMAG 158 12692.54 51.10 1.51 31.18 8444.69 7522.16 5840.41 4742.63 7523.50 39.08 13.62 SLB_MWD +GMAG 159 12723.54 50.73 1.56 31.00 8464.24 7541.52 5864.47 4743.28 7542.59 38.97 1.20 SLB_MWD +GMAG 160 12755.41 50.67 1.34 31.87 8484.42 7561.33 5889.12 4743.90 7562.17 38.85 0.57 SLB MWD +GMAG 161 12787.08 53.01 1.18 31.67 8503.99 7581.28 5914.02 4744.45 7581.91 38.74 7.40 SLB_MWD +GMAG 162 12818.21 58.28 0.83 31.13 8521.55 7601.80 5939.70 4744.90 7602.24 38.62 16.95 SLB_MWD +GMAG 163 12850.06 59.27 1.28 31.85 8538.06 7623.57 5966.93 4745.40 7623.85 38.49 3.33 SLB_MWD +GMAG 164 12881.58 62.72 359.99 31.52 8553.34 7645.47 5994.49 4745.70 7645.63 38.37 11.52 SLB_MWD +GMAG 165 12912.00 66.73 359.42 30.42 8566.33 7667.05 6022.00 4745.55 7667.12 38.24 13.29 SLB MWD +GMAG 166 12944.28 66.81 0.15 32.28 8579.06 7690.36 6051.66 4745.44 7690.37 38.10 2.09 SLB_MWD +GMAG 167 12974.95 65.09 359.94 30.67 8591.56 7712.44 6079.66 4745.46 7712.44 37.97 5.64 SLB_MWD +GMAG 168 13006.42 60.14 0.73 31.47 8606.03 7734.55 6107.60 4745.62 7734.58 37.85 15.89 SLB_MWD +GMAG 169 13038.44 58.31 359.88 32.02 8622.41 7756.32 6135.11 4745.77 7756.41 37.72 6.15 SLB_MWD +GMAG 170 13069.60 54.67 1.67 31.16 8639.61 7777.00 6161.08 4746.11 7777.18 37.61 12.63 SLB MWD +GMAG 171 13099.32 51.45 2.30 29.72 8657.47 7796.21 6184.82 4746.93 7796.50 37.51 10.97 SLB_MWD +GMAG 172 13132.78 49.97 1.57 33.46 8678.66 7817.14 6210.70 4747.81 7817.57 37.40 4.73 SLB_MWD +GMAG 173 13164.68 45.14 3.40 31.90 8700.18 7836.28 6234.21 4748.82 7836.87 37.30 15.72 SLB_MWD +GMAG 174 13190.38 42.73 4.66 25.70 8718.69 7851.07 6251.99 4750.07 7851.78 37.23 9.97 SLB_MWD +GMAG 175 13240.00 42.73 4.66 49.62 8755.14 7879.20 6285.55 4752.80 7880.18 37.09 0.00 SLB BLIND r WELLHEAD = 4-1/ FMC L T 15 [ �[ 6 SAFETY NOTES: ` *4 - 112" CHROME TBC3F "` ACTUATOR = Single KB. ELEV = 61 BF ELEV " 63.13' KOP = 4587 I I L 2230' H 4-1/7' HES X Nip, 1D 3.813" Max Angle95 Datum MD = 13231' GAS LIFT MANDRELS Datum TVD= 8600' SS ST MD TVD DEV' TYPE VLV LATCH PORT DATE 4 3550 3532 18 %in DOME RK 16 04/14/10 L 3 6987 5503 61 KBG SO BK 20 04/14/10 2 10590 7004 66 KBG DMY BK 0 04/09/10 13 -3/8" CSG, 72#, L 80, ID = 12.34T " 2495' 1 12039 7930 35 KBG DMY BK 0 04/09/10 Minimum ID = 3.75" @ 12215' l 4441' I- -17•'x9 -5/8" Baker ZXP LTP I 4-1/2" HES XN NIPPLE I Top of Whipstock I—I 4587' I , xos, — 12073' — 14 - 1/2" HES X Nip, ID 3.813" I HES EZSV H 4600' I ' 12108' H7" x 4-1/2" HES TNT PKR ID= 3.856" 11 I Jet Cut I-1 5000' i i 12139' 1 HES X Nip, ID 3.813" I 0 12215' h4 -1/2" HES XN Nip, ID 3.725" ' ' 12228' I--I4 - 112' TBG, 12.6# , VAMTOP 13 CR -85I EMII i i BKR 5 "x7" ZXPN LTP (10.84' x 5.25" ID J 12219' — PBR) E l i , - 12398' I 7" Lnr, 26 #, L -80 IBT -M ID = 6.276' f iii 9 -5/8" CSG, 47 #, L -80, ID = 8.681" H 10850' I %, I PERFORATION SUMMARY "• •• REF LOG: XXXX ON MM/DD/YY ■ • iii • ANGLE AT TOP PERF: 85o @ 13380' .. Note: Refer to Production DB for historical perf data WAX: °� 15632' H 4-1 /2" Liner, 12.6#, L -80, ID 3.813 SIZE SPF INTERVAL Opn /Sqz DATE ra.� 2.88" 6 13,380- 13,820 0 04/07/10 2.88" 6 14,000- 14,450 0 04/07/10 1 15 -16A 2.88" 6 14,600- 14,630 0 04/07/10 1 ��� 2.88" 6 14,670- 14,750 0 04/07/10 2.88" 6 14,850- 15,020 0 04/07/10 ►�� II 4-11 I 115 -16 TD I•-°I 11891' DATE REV BY COMMENTS DATE REV BY COMMENTS PRUDHOE BAY UNIT 06/30/84 ORIGINAL COMPLETION 04/18/10 SEW/TLH GLV C/O (04/14/10) WELL: 15 - 16B 11/18/90 RING PERMIT No. 210020 11/20/01 CTD SIDETRACK (15 - 16 ") API No: 50 029 - 21115 - 02 - 00 12/31/01 CH/TP CTD SIDETRACK (15 - 16A ?) SEC 22, T11 N, R14E853' FNL & 165' FWL 04/01/10 NIES SIDETRACK (15-16B) 04/18/10 TLH DRLG HO CORRECTIONS BP Exploration (Alaska) • • 7737 P j SEAN PARNELL, GOVERNOR ALASKA OIL AND GAS 333 W. 7th AVENUE, SUITE 100 CONSERVATION COMMISSION ANCHORAGE, ALASKA 99501 -3539 PHONE (907) 279 -1433 FAX (907) 276 -7542 Mr. Greg Hobbs Engineering Team Leader BP Exploration (Alaska) Inc. P.O. Box 196612 Anchorage, Alaska 99519 -6612 Re: Prudhoe Bay Field, Prudhoe Bay Oil Pool, 15 -16B BP Exploration (Alaska) Inc. Permit No: 210 -020 Surface Location: 854' FNL, 165' FWL, SEC. 22, T11N, R14E, UM Bottomhole Location: 1692'FSL, 3183' FWL, SEC. 10, T11N, R14E, UM Dear Mr. Hobbs: Enclosed is the approved application for permit to re -drill the above referenced development well. In accordance with 20 AAC 25.005(f), all records, data and logs acquired for the pilot hole must be clearly differentiated in both well name (PBU 15 -16B PH) and API number (50- 029 - 21115 -70) from records, data and logs acquired for well PBU 15 -16B. This permit to drill does not exempt you from obtaining additional permits or an approval required by law from other governmental agencies and does not authorize conducting drilling operations until all other required permits and approvals have been issued. In addition, the Commission reserves the right to withdraw the permit in the event it was erroneously issued. Operations must be conducted in accordance with AS 31.05 and Title 20, Chapter 25 of the Alaska Administrative Code unless the Commission specifically authorizes a variance. Failure to comply with an applicable provision of AS 31.05, Title 20, Chapter 25 of the Alaska Administrative Code, or a Commission order, or the terms and conditions of this permit may result in the revocation or suspension of the permit. -1 • Daniel T. Seamount, Jr. -��I `1 Chair DATED: This23day of February, 2010. cc: Department of Fish & Game, Habitat Section w/o encl. (via e -mail) Department of Environmental Conservation w/o encl. (via e -mail) STATE OF ALASKA RECEIVED ALAS14111bIL AND GAS CONSERVATION COMMI N ..2. - b/ D PERMIT TO DRILL � � - , 1 1 0 2010 • 20 AAC 25.005 la. Type of work: 1b. Proposed Well Class: ® Development Oil ❑ Service - Winj ❑ Single Zone lc. spec' t i we s ❑ Drill ® Redrill ❑ Stratigraphic Test ❑ Development Gas ❑ Service - Supply ❑ Multiple Zone ❑ Coalbed C �� ige Hydrates ❑ Re -Entry ❑ Exploratory ❑ Service - WAG ❑ Service - Disp ❑ Shale Gas 2. Operator Name: 5. Bond: IN Blanket ❑ Single Well 11. Well Name and Number: ,(, BP Exploration (Alaska) Inc. Bond No. 6194193 15 - 16B 4 p• pie t40 3. Address: 6. Proposed Depth: 12. Field / Pool(s): (, er):_ P.O. Box 196612, Anchorage, Alaska 99519 -6612 MD 15670' TVD 8695' Prudhoe Bay Field / Prudhoe I p• 4a. Location of Well (Govemmental Section): 7. Property Designation (Lease Numb Bay Oil Pool L� N Surface: ADL 028306 & 02830 854' FNL, 165' FWL, SEC. 22, T11N, R14E, UM Top of Productive Horizon: 8. Land Use Permit: 13. Approximate Spud Date: 4844' FSL, 4897' FWL, SEC. 15, T11N, R14E, UM March 15, 2010 Total Depth: 9. Acres in Property: 14. Distance to Nearest Property: 1692' FSL, 3183' FWL, SEC. 10, T11N, R14E, UM 2560 17,000' 4b. Location of Well (State Base Plane Coordinates - NAD 27): 10. KB Elevation above MSL: -52.3' feet 15. Distance to Nearest Well Open Surface: x- 676088 y- 5960631 Zone- ASP4 GL Elevation above MSL: 32.8' feet to Same Pool: 850' 16. Deviated Wells: Kickoff Depth: 4600 feet 17. Maximum Anticipated Pressures in psig (see 20 AAC 25.035) Maximum Hole Angle: 93 degrees Downhole: 4170 • Surface: 3377 18. Casing Program: Specifications Top - Setting Depth - Bottom Quantity of Cement, c.f. or sacks Hole Casing Weight Grade Coupling Length MD TVD MD TVD (including stage data) 8 -1/2" 7" 26# L -80 TC-Il 8031' 4450' 4298' 12481' 8274' 166 sx Class 'G' • 6 -1/8" 4 -1/2" 12.6# L -80 IBT -M 3338' 12331' 8144' 15669' 8695' ,465 sx Class 'G' . 19. PRESENT WELL CONDITION SUMMARY (To be completed for Redrill and Re -entry Operations) Total Depth MD (ft): Total Depth TVD (ft): Plugs (measured): Effective Depth MD (ft): Effective Depth TVD (ft): Junk (measured): 13715' 8762' None 13649' 8760' None Casing Length Size Cement Volume MD TVD Conductor / Structural 80' 20" 1910 # Poleset 80' 80' Surface 2495' 13 -3/8" 1900 sx Permafrost 'E'. 400 sx PF 'C' 2495' 2495' Intermediate 10850' 9 -5/8" 500 sx Class 'G'. 300 sx PF 'C' 10850' 8325' Production Liner 1040' 7" 380 sx Class 'G' 10496' - 11536' 8094' - 8702' Liner 2920' 2 -3/8" 88 sx Class 'G' 10795' - 13715' 8291' - 8762' Perforation Depth MD (ft): 11710' - 13518' Perforation Depth TVD (ft): 8780' - 8759' 20. Attachments: ❑ Property Plat ❑ BOP Sketch ® Drilling Program ❑ Time vs Depth Plot ❑ Shallow Hazard Analysis ❑ Diverter Sketch ❑ Seabed Report Drilling Fluid Program ® 20 AAC 25.050 Requirements 21. Verbal Approval: Commission Representative: Date: 22. I hereby certify that the foregoing is true and correct. Contact Charles Reynolds, 564 -5480 Printed Name Gre • W' b •._ Title Engineering Team Leader (i, Prepared By Name/Number Signature Phone 564 -4191 Date 2f /o /b Terrie Hubble, 564 -4628 Commission Use Only Permit To Drill API Number: Permit I See cover letter for Number: 2 /DO 50 - 029 - 21115 - - / / • � a / / t �0 other requirements f Approval: If box is checked, w ell may not be used to lore for, test, or produce coalbbd meth�ine gas hydrates, or Conditions o eck y xp p , gas contained shales: j 9 Y 9 v 35' l o's` COP �S't Samples Req'd: �/ , o Other: / \ P eq' Oyes Bii No Mud Log Req'd: ❑ Yes I N 4- ZSo P s .' A h n a " s 1 - C ^4'`4. H Measures: Yes ❑ No Directional Survey Req'd: [ Yes ❑ No — De / .../ re 2 L pit s 4..cctp4 44c ZS' .2.0 • / APPROVED BY THE COMMISSION Z S � Date ` / COMMISSIONER Form 1/ 0 01 Revi 07/2009 This permit is valid for 24 months from thfe date of approval (20 AAC 25.005(g)) Submit In Duplicate ORIGINAL .4., z./710 �/ra /ry • • by 0 To: Alaska Oil & Gas Conservation Commission From: Charles Reynolds, ODE Date: February 5, 2010 Re: 15 -16B Sidetrack Permit to Drill The sidetrack plan for the 15 -16B includes the following: during pre -rig operations bullheading cement across the perforations and cutting the 3 -1/2" tubing -400' below the planned whipstock exit point. During rig operations, the 4 -1/2" x 3 -1/2" tubing will be pulled. The whipstock exit from the 9 -5/8" casing is estimated at 4600' MD and will be milled using an 8 -1/2" milling assembly. The 8 -1/2" hole will be drilled to the Top of the Sag River where a 7" liner will be run and 1000' of cement will be pumped. The pj(,+- production hole will be drilled with a 6 -1/8" BHA initially penetrating through the lvishak H -- into the Kavik. An openhole sidetrack will then be performed in Zone 2 of the lvishak p ktM, ci and building to horizontal in Zone 1A. The well will then run horizontal) through the Ivishak formation. The liner will be a 4 -1/2" L -80 liner and the u 'rig will be 4 -1/2" ./ 7'e1 13Cr, tied into the top of the production liner. Please note the following Well Summary as detailed on the next few pages: 15 -16B Permit to Drill Application Page 1 • • Planned Well Summary Well 15 -16B Well Producer Objective Ivishak API Number: 50- 029 - 21115 -02 • Current Status 15 -16A Cycling producer Estimated Start Date: March -2010 Time to Complete: 26 Days • Surface Northing Easting Offsets TRS Location 5,960,631 676,088 853' FNL / 165' FWL 11N, 14E, 22 Northing Easting TVDss Offsets TRS Sag Target 5,966,439 680,673 -8,229 435' FNL / 4987' FWL 11N, 14E, 15 PBot HL for Hole 5,966,974 680,683 -8,670 5148' FNL / 4921' FWL 11N, 14E, 10 Target Location 5,967,238 680,634 -8,652 4965' FNL / 4864' FWL 11 N, 14E, 10 BHL 5,968,525 678,906 -8,635 3588' FNL / 3183' FWL 11N, 14E, 10 Planned KOP: 4,600'MD/ 4,337' TVDss Planned TD: 15,670'MD/ 8,695' TVD Rig: Nabors 7ES GURT: 23.8'/28.5' RTE: 52.3' Directional — Schlumberger /Anadrill DS15- 16BPB1 (P3), DS15 -16B (P4) KOP: 1 4600' MD Maximum Hole Angle: -66° in the 8 -1/2" intermediate section -93° in the 6 -1/8" production section Close Approach Wells: Two anti - collision risks in this well 15 -36 and PBST01 Survey Program: Standard MWD +IIFR +MS Nearest Property Line: 17000' (N) Nearest Well within Pool: 850' to 15 -36B Contacts Name Phone # E -mail Drilling Engineer Charles Reynolds 564 -5480 charles.reynolds @bp.com Geologist Doug Stoner 564 -5652 doug.stoner @bp.com Pad Engineer Nathan Sinyangwe 564 -5062 nathan.sinyangwe @bp.com I'I 15 -16B Permit to Drill Application Page 2 • II Formation Markers 15 -16B (Based on SOR) Formation (TVDss) (feet) (Yes/No) (Psi) NOTE: All formation tops are required from 1000' above proposed KOP to TD for sidetracks NOTE: All formation tops are required from surface to TD for all new wells SV5 -2807 No SV4 -2988 No SV3 -3500 No SV2 -3697 No SV1 -4087 No UG4 -4588 No UG3 -4863 No UG1 -5268 No WS2 -5903 No WS1 -6096 No CM3 -6294 No CM2 -6750 No CM1' -7406 No THRZ -7668 No BHRZ -7859 No PutRiver -7869 Yes 4170 LCU/TJB -8011 No TJA -8137 - No TSGR -8229 20 Yes TSHA -8269 20 Yes TSAD -8323 20 Yes Fault -8414 20 Yes BCGL -8416 20 Yes 23SB -8465 20 Yes 22TS -8500 20 Yes 21TS -8550 20 Yes TZ1B -8595 20 Yes TDF -8631 20 Yes 3200 BSAD -8658 20 No 15 -16B Permit to Drill Application Page 3 • Casing /Tubing Program Hole Csg / Wt/Ft Grade Conn Burst Collapse Length Top Bottom Size Tbg O.D. (psi) (psi) MD / TVD MD / TVD 8 -W 7" 26# L -80 TC -II 7,240 5,410 8,031' 4450'/4,298' 12,481' / 8,274' 6 -1/8" 4'/2" 12.6# L -80 IBT -M 8,430 7,500 3,338' 12,331/8,144' 15,669' / 8,695' Tubing 4'/2" 12.6# 13Cr -80 Top 8,430 7,500 12,331' Surface 12,331/8,144' Mud Program Intermediate Mud Properties: LSND 1 8 -1/2" hole section Depth Interval Density (ppg) PV YP API FL HTHP FL MBT PH 4,600'- 12,451' 10.3 • 12 - 22 18 - 28 4 - 6 <10.0 <20 9 - 10 (KOP to Sag) Production Mud Properties: FLOPRO SF Reservoir Drill -in Fluid 1 6 -1/8" hole section Depth Interval Density (ppg) PV YP LSVR API Fl pH MBT 12,481'- 15,650' 8.4 — 8.5 • 8 -12 22 -28 >20,000 6.0 -8.0 9.0 -9.5 < 3 Logging Program 8 -1/2" Intermediate: Sample Catchers — as required by Geology Drilling: Dir /GR/Res/ . Open Hole: None Cased Hole: None 6 -1/8" Production: Sample Catchers — as required by Geology Drilling: Dir!GR/RES /Neu /Den Open Hole: None Cased Hole: None Cement Program Casing Size 7" 26 #, L -80 Intermediate Casing Basis: Lead: None Tail: Volume of open hole + 40% excess + 80' shoe track Tail TOC: 11481' MD Total Cement Spacer 25 bbls of Viscosified Spacer weighted to 11 ppg (Mud Push 11) Volume: Lead N/A Tail 35 bbls, 195 cuft, 166.4 sks 15.8 lb/gal Class G + adds @ 1.17 cuft/sk Temp BHST = 165° F, BHCT TBD by Schlumberger Casing Size 4.5" 12.6 #, L -80 Production Liner Basis: Lead: None Tail: Volume of open hole + 40% excess + 80' shoe track + Pilot OH + 150' of liner lap + 200' of 7" x 4" DP excess. Tail TOC: 12,331 MD (Liner Top, excess will be circulated out) Total Cement Spacer 25 bbls of Viscosified Spacer weighted to 12 ppg (Mud Push 11) Volume: Lead N/A Tail 96 bbls, 539.1 cuft, 465 sks 15.8 lb/gal Class G + adds @ 1.17 cuft/sk Temp BHST = 175° F, BHCT TBD by Schlumberger 15 -16B Permit to Drill Application Page 4 Surface and Anti - Collision Issues • Surface Shut -in Wells: There are no wells requiring surface shut -in in order to move onto the well. At surface 15 -17 is -120' to the north and 15 -06 is to the south -120'. Close Approach Shut -in Wells: • 15 and all of it's wellbores fail major risk on the anti - collision report. The 15 -36 parent well was drilled in 1994. In 2001 the main bore was abandoned and an attempt was made to sidetrack the well unsuccessfully and the second , completion was plugged with cement. The current lateral, 15 -36B was drilled in 2006 and is currently producing. A tolerable collision risk worksheet will be filled out for 15 -36B and the well will be shut in while drilling 15 -16B. Prudhoe Bay State 01 is a wildcat well drilled from 1967 to 1968. This well has since been plugged and abandoned with 2 cement plugs in the zone of interest. A tolerable collision risk worksheet will be filled out for PBST -01. Hydrogen Sulfide Recent H data from the pad is as follows: Well Name H2S Level Date of Reading #1 Closest SHL Well H2S Level 15 -17 5 ppm 4/30/2001 #2 Closest SHL Well H2S Level 15 -06A 8 ppm 3/5/2001 #1 Closest BHL Well H2S Level 15 -30A 26 ppm 3/23/2008 #2 Closest BHL Well H2S Level 15 -36B 14 ppm 6/19/2009 Max. Recorded H2S on Pad/Facility 15 -20C 40 ppm 7/1/2006 Other Relevant H2S Data DS -15 is not an H2S site, most wells are typically less than (H2S alarms from rigs, etc.) 20 ppm Faults There are 2 expected fault crossings in the planned wellbore. Both faults will be encountered in the production section. Fault #1 has an estimated throw of 75 -125' and fault #2 has an estimated throw of 20 -40'. LC potential is considered moderate. Well Control Well control equipment consisting of 5,000 psi working pressure pipe rams (2), blind /shear rams, and annular preventer will be installed and are capable of handling the maximum potential surface pressures. Based upon calculations below, BOP equipment will be tested to 3,500 psi. BOP regular test frequency for 15 -16B will be 14 days during drilling phase and 7 days during decompletion and surface casing work. BOPE and drilling fluid system schematics on file with the AOGCC. Intermediate Interval Maximum anticipated BHP 4,170 psi @ 7,928' TVD (10.12 ppg EMW) Maximum surface pressure 3,377 psi (.10 psi /ft gas gradient to surface) Kick tolerance 50.5 with 12.8 ppg frac gradient, assuming 10.2 ppg reservoir, 4" DP and 10.4 ppg MW Planned BOP test pressure Rams test to 3,500 psi /250 psi. Annular test to 2,500 psi /250 psi 7" Casing Test 3500 psi surface pressure Integrity Test - 8-1/2" hole FIT /LOT after drilling 20' from middle of window 7" Casing The VBRs will be changed to 7" rams to accommodate the 7" drilling liner 15 -16B Permit to Drill Application Page 5 Production Interval • Maximum anticipated BHP 3,200 psi 8,690' TVDss (7.08 ppg EMW) Maximum surface pressure 2,331 psi (.10 psi /ft gas gradient to surface) Kick tolerance Infinite with 9.0 ppg frac gradient, assuming 7.08 ppg reservoir, 4" DP and 8.5 ppg MW Planned BOP test pressure Rams test to 3,500 psi /250 psi. Annular test to 2,500 psi /250 psi Integrity Test — 6 -1/8" hole FIT /LOT after drilling 20' of new hole Planned completion fluids 8.5 ppg Seawater / 6.8 ppg Diesel Other Requests: None Disposal • No annular injection in this well. • Cuttings Handling: Cuttings generated from drilling operations will be hauled to grind and inject at DS- 04. Any metal cuttings will be sent to the North Slope Borough. • Fluid Handling: Haul all drilling and completion fluids and other Class II wastes to DS -04 for injection. Haul all Class I waste to Pad 3 for disposal. 15 -16B Permit to Drill Application Page 6 Drilling • Hazards and Contingencies POST THIS NOTICE IN THE DOGHOUSE I. Well Control A. While drilling the intermediate section the Put River formation is expected to be 10.2 ppg EMW. B. The Ivishak in this fault block is expected to be 7.08 ppg EMW. This pressure is estimated based on offset well pressures. 3500 psi test pressure is in accordance with the RP for Prudhoe production well casing tests for producing wells. 11. Lost Circulation/Breathing A. Drill Site 15 is in the med risk zone for LC according to the WURD lost circulation study. There are 2 expected fault crossings in the planned wellbore. Both faults will be encountered in the production section and the lost circulation potential is considered moderate B. In the recently drilled 15 -29B sidetrack to the NW, we did experience severe breathing issues while in the Colville. 111. Kick Tolerance /Integrity Testing A. With the planned mud weights, the kick tolerance for the intermediate section is 50 bbls, and for the production section is infinite. The FIT /LOT will prove up adequate formation strength for expected ECD's. B. Integrity Testing Test Point Test Depth Test type 9-%" window 20 -ft minimum from the 9 -%" window FIT /LOT 7" shoe 20 -ft minimum from the 7" shoe FIT /LOT IV. Hydrogen Sulfide A. Drill Site 15 is not considered an H2S site. The highest reading of H2S from 15 -16 is 12 ppm in 2001. The highest recorded H2S level on the pad was 40 ppm on 15 -20C (7/01/2006) V. Faults A. There are 2 expected fault crossings in on 15 -16B. Both faults will be encountered in the production section and the lost circulation potential is considered moderate. VI. Anti - Collision Issues A. 15 -36 and all of it's wellbores fail major risk on the anti - collision report. The 15 -36 parent well was drilled in 1994. In 2001 the main bore was abandoned and an attempt was made to sidetrack the well unsuccessfully and the second completion was plugged with cement. The current lateral, 15 -36B was drilled in 2006 and is currently producing. A tolerable collision risk worksheet will be filled out for 15- 36B and the well will be shut in while drilling 15 -16B. B. Prudhoe Bay State 01 is a wildcat well drilled from 1967 to 1968. This well has since been plugged and abandoned with 2 cement plugs in the zone of interest. A tolerable collision risk worksheet will be filled out for PBST -01. CONSULT THE DS -17 DATA SHEET AND THE WELL PLAN FOR ADDITIONAL INFORMATION 15 -16B Permit to Drill Application Page 7 • • Operations Summary Well Status: ✓ PPPOT - T in pre -rig work ✓ PPPOT - IC in pre -rig work ✓ MIT - OA Passed to 2000 psi 7/9/09 ✓ MIT - IA Passed to 3000 psi 7/9/09 Notify the field AOGCC representative with intent to plug and abandon Pre -Riq Operations: W 1 Function tubing and casing LDS. Repair /replace as required. Perform PPPOT -IC to 3500psi and PPPOT -T to 5000psi. MIT -IA to 3500, and MIT -OA to 2000 psi Passed 9/8/09 S 2 Drift tubing to 7000'. F 3 Flush chemical injection line with diesel F 4 Confirm injectivity into the open perfs as required for P &A to follow. If injectivity is sufficient for fullbore P &A, proceed with step 5. If not, contact ODE F 5 "Bullhead" 34 bbl (10bbI excess for perfs), 15.8ppg G cement to plug and abandon the current well perforations: Liner Size 4.7# 2 -3/8" (.0039 bpf) from 10795' to 13649' MD 11 bbls Tubing size 9.3# 3 -1/2" (.0087 bpf) from 10795' to 9850' MD 13 bbls Bottom of plug 13649' MD Desired Top of Cement 9300' MD Total Footage 4350' Top Perf 11,710' MD Bottom Perf 13,518' MD Max TOC - 5500', Min TOC - 9850' S 6 WOC. Drift to TOC and tag. F 7 MIT -T to 3,500 psi. Pressure test is required for competent barrier for rig operations. If test fails, contact ODE. Freeze Protect as necessary. E 8 Jet cut tubing @ 5000' MD. F 9 CMIT TxIA to 3,500 psi. If combo fails, contact ODE. D 10 Bleed casing and annulus pressures to zero. ✓ 11 Set a BPV. Remove well house and flow line. Level pad as necessary. *Gyro to 10.000'MD on 15 -36B and down to 8500' MD on 15 -37B Riq Operations: 1. MI / RU Nabors rig 7ES 2. Pull BPV. Circulate out diesel freeze protection and displace the well to seawater. 3. Set and test TWC to 1,000 psi from above and below. 4. Nipple down tree & tubing adapter. Nipple up and test BOPE to 3,500psi high/ 250psi low. Pull TWC. 5. R/U & pull 4 -1/2" x 3 -'h" tubing from the cut depth at 5000' MD. 6. R/U & Run 9 -5/8" cleanout BHA down past EZSV setting depth 7. RIH with HES EZSV bridge plug on E -line and set at -4600' MD, as required to avoid cutting a casing collar while milling the window. 8. Pressure -test the 9-%" casing to 3,500 psi for 30 minutes. Record test. 9. Change out 9 -5/8" Pack offs 10. P/U and RIH with 9-%" Baker bottom -trip anchor whip stock assembly. Orient whipstock and set on EZSV bridge plug. Shear off of whip stock. 15 -16B Permit to Drill Application Page 8 11. Displace the well to LSND based milling fluid. Completely displace the well prior to beginning milling operations. 12. Mill window in 9-%" casing, plus approximately 20' beyond middle of window. Circulate well bore clean. 13. Pull up into 9-%" casing and perform LOT. POOH. 14. M/U 8 -Y2" RSS GR/RES /PWD /MWD assembly. RIH, kick off and drill the 8 -'/2" intermediate section with LSND drilling fluid. 15. Drill ahead to the 7" liner point at top of the Sag River, as per the directional plan. Circulate the well clean, short trip as needed. POOH. 16. Change out to 7" rams, and test to 250 psi / 3,500 psi 17. MU and run 7 ", 26 #, L -80, TCII liner to bottom on drill pipe. Circulate and condition the hole. 18. Pump 1000' of cement behind the 7" liner. Test the liner to 3,500 psi for 30 charted min tes 19. Set the hanger and packer. -7 ' e s t ( tom Pk 1 . ? 'Y" 12. s r a P z-- 4r. / a? 20. Circulate bottoms up, POOH, UD liner running tool (LRT). 21. Change out rams to variable and test to 250 psi / 3,500 psi 22. M/U the first 6 -W Dir /GR/DEN /NEU /Res assembly with an insert bit. Pick Up DP as necessary. 23. RIH, Drill out of cement and 7" liner float equipment. 24. Displace to 8.4 ppg Flo Pro Fluid. 25. Continue drilling out the 7" shoe plus -20' new formation, pull up into the shoe and perform a FIT. 26. Drill the 6 -W production interval as per directional plan to TD of pilot hole 27. Pull up to designated sidetrack spot and begin time drilling, trough sufficient footage to start sidetrack. 28. Continue drilling build and land for horizontal BHA 29. POOH for lateral section motor bend and PDC bit. PU horizontal BHA. 30. RIH, drill ahead to TD 31. POOH. VD BHA. 32. MU and RIH to bottom with 4 - ", 12.6 #, L -80 solid liner. This will include 150' liner lap inside the 7" drilling liner. 33. Cement the liner. 34. Set liner top packer and displace well to clean seawater above the liner top. a. A perf pill will be left in the 4 -'/2" liner. 35. POOH, VD LRT. 36. Pressure test casing and liner to 3,500 psi for 30 minutes. / 37. RU DPC perf guns, RIH and perforate. Perf intervals to be supplied by asset. 38. R/U and run a 4 -'/2 ", 12.6 #, 13Cr, VamTop tubing completion, stinging into the 4 - liner tie back sleeve. 39. Space out and make up tubing hanger per FMC Rep. 40. Land the tubing hanger, and run in lock down screws. 41. Circulate Corrosion Inhibitor. 42. Set packer and individually test the tubing and annulus to 3,500 psi for 30 minutes. Record each test. 43. Shear Circulating Valve 44. Set a BPV. 45. Nipple down the BOPE. Nipple up the tree and test to 5,000 psi. 46. Freeze protect the well to -2,200' TVD. Secure the well. 47. RD and Move Off. Post -Rio Operations: 1. MI / RU slick line. Pull the ball and rod / RHC plug from landing nipple below the production packer. 2. Replace the DCK shear valve with a dummy GLV. 3. Install well house and instrumentation. 4. Modify S- Riser As Needed. 5. ASRC flowback Drilling Engineer: Charles Reynolds (907) 564 -5480 Production Engineer: Nathan Sinyangwe (907) 564 -5062 Geologist: Doug Stoner (907) 564 -5652 ATTACH: Current Schematic Pre -Rig Schematic Proposed Schematic 15 -16B Permit to Drill Application Page 9 by 0 DS15- 16BPB1 (P3) Proposal Schlumberger Report Date: December 21, 2009 Survey I DLS Computation Method: Minimum Curvature / Lubinski Client: BP Exploration Alaska Vertical Section Azimuth: 38.540° Field: Prudhoe Bay Unit - EOA Vertical Section Origin: N 0.000 ft, E 0.000 ft Structure 1 Slot: DS 15 / 15 -16 ty s 1 V TVD Reference Datum: Rotary Table • Well: 15 -16 �'��'' TVD Reference Elevation: 59.50 ft relative to MSL Borehole: Plan 15- 16BPB1 �� Sea Bed / Ground Level Elevation: 31.00 ft relative to MSL UWUAPUF: 500292111570 Magnetic Declination: 22.249° Survey Name 1 Date: 15- 16BPB1 (P3) / December 18, 2009 Total Field Strength: 57693.485 nT Tort I AHD 1 DDI I ERD ratio: 182.592° / 8014.52 ft / 6.345 / 0.918 Magnetic Dip: 80.947° Grid Coordinate System: NAD27 Alaska State Planes, Zone 04, US Feet Declination Date: May 10, 2010 Location Lat/Long: N 70.29803302, W 148.57390896 Magnetic Declination Model: BGGM 2009 Location Grid NIE YIX: N 5960630.760 ftUS, E 676088.190 ftUS North Reference: True North Grid Convergence Angle: +1.34263779° Total Corr Mag North a True North: +22.249° Grid Scale Factor: 0.99993522 Local Coordinates Referenced To: Well Head • I Measured Azimuth Vertical NS EW Mag I Gray Directional Zone Of Zone Of Comments Inclination Sub-Sea TVD TVD DLS Northing Easting Depth True Section True North True North Tool Face Difficulty Exclusion Exclusion I (ft) (deg) I (deg) I (ft) I I ft l (ft) I ft l I ft l (deg) (deg1100 ff) Index (deg) Alert (ftUS) I (ftUS ) Tie - In Survey 4588.50 49.09 34.56 4329.74 4389.24 726.23 622.68 383.90 8.10R 3.73 4.68 40.28 5961262.22 676457.37 Top Whipstock 4600.00 49.56 34.65 4337.24 4396.74 734.93 629.85 388.85 130.00R 4.08 4.69 40.75 5961269.51 676462.15 Base Whipstock 4616.00 48.34 36.62 4347.75 4407.25 746.98 639.66 395.88 - -- 12.00 4.71 39.62 5961279.48 676468.94 Cry 4/100 4629.00 48.34 36.62 4356.39 4415.89 756.69 647.46 401.67 130.00R 0.00 4.71 39.62 5961287.41 676474.55 4700.00 46.55 39.61 4404.41 4463.91 808.97 688.61 433.93 127.97R 4.00 4.76 37.99 5961329.30 676505.83 Cry 4/100 4729.00 45.84 40.89 4424.49 4483.99 829.89 704.58 447.45 5.05R 4.00 4.78 37.36 5961345.58 676518.98 4800.00 48.67 41.22 4472.67 4532.17 881.98 743.90 481.69 4.82R 4.00 4.83 40.20 5961385.69 676552.29 4900.00 52.66 41.64 4536.04 4595.54 959.21 801.87 532.87 4.56R 4.00 4.89 44.20 5961444.84 676602.09 UG4 4989.36 56.22 41.98 4588.00 4647.50 1031.78 856.04 581.34 4.36R 4.00 4.94 47.77 5961500.13 676649.27 5000.00 56.65 42.02 4593.88 4653.38 1040.63 862.63 587.27 4.34R 4.00 4.95 48.20 5961506.85 676655.05 5100.00 60.64 42.37 4645.91 4705.41 1125.83 925.87 644.62 4.16R 4.00 5.01 52.20 5961571.42 676710.89 5200.00 64.63 42.69 4691.87 4751.37 1214.40 991.30 704.64 4.01R 4.00 5.07 56.20 5961638.23 676769.36 End Cry 5214.64 65.21 42.74 4698.08 4757.58 1227.62 1001.04 713.63 - -- 4.00 5.08 56.78 5961648.18 676778.12 UG3 5607.98 65.21 42.74 4863.00 4922.50 1583.77 1263.33 955.96 - -- 0.00 5.20 56.78 5961916.06 67701 UG1 6573.91 65.21 42.74 5268.00 5327.50 2458.34 1907.43 1551.05 - -- 0.00 5.42 56.78 5962573.88 677594. WS2 8088.39 65.21 42.74 5903.00 5962.50 3829.58 2917.31 2484.09 - -- 0.00 5.66 56.79 5963605.27 678503.08 WS1 8548.69 65.21 42.74 6096.00 6155.50 4246.35 3224.25 2767.68 -- 0.00 5.71 56.79 5963918.75 678779.38 CM3 9020.93 65.21 42.74 6294.00 6353.50 4673.92 3539.14 3058.61 - -- 0.00 5.76 56.79 5964240.35 679062.83 CM2 10108.49 65.21 42.74 6750.00 6809.50 5658.62 4264.34 3728.63 - -- 0.00 5.86 56.79 5964981.01 679715.64 Cry 4/100 10987.54 65.21 42.74 7118.57 7178.07 6454.53 4850.51 4270.20 158.30L 0.00 5.93 56.79 5965579.66 680243.28 11000.00 64.75 42.53 7123.84 7183.34 6465.80 4858.82 4277.85 158.22L 4.00 5.94 56.32 5965588.15 680250.74 11100.00 61.04 40.84 7169.40 7228.90 6554.66 4925.27 4337.05 157.44L 4.00 5.96 52.52 5965655.96 680308.36 11200.00 57.36 39.02 7220.60 7280.10 6640.51 4991.11 4392.18 156.51L 4.00 5.99 48.75 5965723.07 680361.93 11300.00 53.71 37.04 7277.18 7336.68 6722.93 5056.02 4442.99 155.39L 4.00 6.01 45.01 5965789.15 680411.20 11400.00 50.09 34.87 7338.88 7398.38 6801.53 5119.68 4489.20 154.05L 4.00 6.03 41.30 5965853.87 680455.91 11500.00 46.52 32.46 7405.39 7464.89 6875.91 5181.79 4530.62 152.45L 4.00 6.06 37.65 5965916.93 680495.85 CM1 11500.88 46.49 32.43 7406.00 7465.50 6876.54 5182.33 4530.96 152.43L 4.00 6.06 37.62 5965917.48 680496.18 11600.00 43.00 29.75 7476.40 7535.90 6945.71 5242.03 4567.02 150.52L 4.00 6.08 34.06 5965978.01 680530.83 WellDesign Ver SP 2.1 Bld( users) 15- 16 \15 -16 \Plan 15- 16BPB1 \15- 16BPB1 (P3) Generated 12/21/2009 10:54 AM Page 1 of 2 I Measured Azimuth Vertical NS EW Mag /Gray Directional Zone Of Zone Of Comments Depth Inclination True Sub Sea TVD TVD Section True North True North Tool Face DLS Difficulty Exclusion Exclusion Northing Easting I (ft) I (deg) (deg) I (ft) (ft) (ft) (ft ) (ft ) I ( deg) ( deg /100 ft ) Index (deg) Alert (NS) (ftUS ) 11700.00 39.56 26.66 7551.54 7611.04 7010.60 5300.12 4598.24 148.20L 4.00 6.09 30.55 5966036.81 680560.68 11800.00 36.21 23.09 7630.46 7689.96 7070.25 5355.78 4624.12 145.38L 4.00 6.11 27.18 5966093.05 680585.25 THRZ 11846.09 34.71 21.25 7668.00 7727.50 7095.91 5380.53 4634.22 143.88L 4.00 6.12 25.67 5966118.03 680594.76 11900.00 32.99 18.91 7712.78 7772.28 7124.39 5408.72 4644.54 141.94L 4.00 6.13 23.97 5966146.46 680604.42 End Cry 11997.58 30.00 14.10 7795.99 7855.49 7171.64 5457.53 4659.10 - -- 4.00 6.15 21.09 5966195.59 680617.83 BHRZ 12070.34 30.00 14.10 7859.00 7918.50 7204.76 5492.82 4667.96 - -- 0.00 6.15 21.09 5966231.07 680625.86 Put River 12081.89 30.00 14.10 7869.00 7928.50 7210.01 5498.42 4669.37 - -- 0.00 6.15 21.09 5966236.70 680627.14 LCU /TJB 12245.86 30.00 14.10 8011.00 8070.50 7284.65 5577.93 4689.34 - -- 0.00 6.15 21.09 5966316.66 680645.24 TJA 12391.35 30.00 14.10 8137.00 8196.50 7350.88 5648.48 4707.06 - -- 0.00 6.15 21.09 5966387.60 680661.30 TSAG 12497.57 30.00 14.10 8228.99 8288.49 7399.23 5699.99 4720.00 - -- 0.00 6.15 21.09 5966439.40 680673.03 Sag Targert 12497.58 30.00 14.10 8229.00 8288.50 7399.24 5700.00 4720.00 - -- 0.00 6.15 21.09 5966439.40 680673.03 7" Csg 12497.59 30.00 14.10 8229.01 8288.51 7399.24 5700.01 4720.00 - -- 0.00 6.15 21.09 5966439.41 680673.03 Bid 7.25/100 12502.58 30.00 14.10 8233.33 8292.83 7401.51 5702.42 4720.61 26.31L 0.00 6.15 21.09 5966441.84 680673. TSHU A 12544.38 32.84 11.54 8269.00 8328.50 7421.13 5723.67 4725.42 24.13L 7.50 6.17 24.01 5966463.19 68067 12600.00 36.68 8.68 8314.69 8374.19 7448.98 5754.88 4730.95 21.78L 7.50 6.18 27.97 . 5966494.52 68068 TSAD 12610.41 37.41 8.21 8323.00 8382.50 7454.41 5761.08 4731.87 21.40L 7.50 6.18 28.71 5966500.74 680683.46 12700.00 43.72 4.67 8391.03 8450.53 7503.65 5818.94 4738.28 18.71L 7.50 6.21 35.19 5966558.73 680688.52 Fault 12732.41 46.03 3.58 8414.00 8473.50 7522.51 5841.74 4739.92 17.94L 7.50 6.22 37.55 5966581.56 680689.62 BCGL 12735.29 46.23 3.49 8416.00 8475.50 7524.22 5843.82 4740.05 17.87L 7.50 6.22 37.77 5966583.64 680689.70 12800.00 50.87 1.57 8458.82 8518.32 7563.42 5892.25 4742.16 16.60L 7.50 6.23 42.50 5966632.11 680690.68 23SB 12809.86 51.58 1.30 8465.00 8524.50 7569.55 5899.94 4742.35 16.43L 7.50 6.24 43.23 5966639.80 680690.69 22TS 12869.01 55.84 359.79 8500.00 8559.50 7607.10 5947.60 4742.79 15.54L 7.50 6.25 47.58 5966687.45 680690.01 12900.00 58.08 359.05 8516.90 8576.40 7627.25 5973.58 4742.53 15.14L 7.50 6.26 49.86 5966713.41 680689.14 2/TS 12967.30 62.96 357.58 8550.00 8609.50 7671.96 6032.12 4740.79 14.41L 7.50 6.28 54.83 5966771.89 680686.03 End Bid 12995.30 65.00 357.00 8562.28 8621.78 7690.88 6057.25 4739.59 - -- 7.50 6.29 56.90 5966796.99 680684.25 Drp 12/100 13045.30 65.00 357.00 8583.41 8642.91 7724.79 6102.50 4737.22 150.00R 0.00 6.29 56.90 5966842.17 680680.82 TZ1B 13071.40 62.30 358.77 8595.00 8654.50 7742.53 6125.88 4736.36 149.21R 12.00 6.30 54.08 5966865.52 680679.40 13100.00 59.36 0.81 8608.94 8668.44 7762.00 6150.84 4736.26 148.22R 12.00 6.31 51.02 5966890.47 680678.72 13139.08 55.41 3.81 8630.00 8689.50 7788.54 6183.72 4737.56 146.60R 12.00 6.32 46.90 5966923.37 680679.25 TDF 13140.84 55.24 3.95 8631.00 8690.50 7789.72 6185.17 4737.66 146.52R 12.00 6.32 46.72 5966924.82 680679.32 BSAD 13185.73 50.80 7.78 8658.00 8717.50 7819.87 6220.82 4741.29 144.22R 12.00 6.34 42.10 5966960.54 680682. 13200.00 49.42 9.10 8667.15 8726.65 7829.34 6231.65 4742.89 143.37R 12.00 6.34 40.66 5966971.41 68068 TD 13204.36 49.00 9.51 8670.00 8729.50 7832.22 6234.91 4743.43 - -- 12.00 6.35 40.23 5966974.68 680683.92 Survey Error Model: SLB ISCWSA version 24*** 3 -D 95.00% Confidence 2.7955 sigma Survevina Proa: MD From (ft) MD To ( ft 1 EOU Freq Survey Tool Type Borehole -> Survey 0.00 28.50 Act -Stns SLB_ZERO -Depth Only 15 -16 -> 15 -16 28.50 4588.50 Act -Stns SLB_CNSG +CASING 15 -16 -> 15 -16 4588.50 4900.00 1/100.00 SLB_INC +TREND Plan 15- 16BPB1 -> 15- 16BPB1 (P3) 4900.00 12497.59 1/100.00 SLB_MWD +GMAGAA1 Plan 15- 16BPB1 -> 15- 16BPB1 (P3) 12497.59 13204.36 1/100.00 SLB MWD +GMAGAA2 Plan 15- 16BPB1 -> 15- 16BPB1 (P3) Legal Description: Northing (Y) (BUS( Eastina (X) (ftUS( Surface : 4426 FSL 5115 FEL S22 T11N R14E UM 5960630.76 676088.19 Sag Targert : 4844 FSL 383 FEL S15 T11N R14E UM 5966439.40 680673.03 BHL : 99 FSL 358 FEL S10 T11N R14E UM 5966974.68 680683.92 WellDesign Ver SP 2.1 Bld( users) 15- 16 \15 -16 \Plan 15- 16BPB1 \15- 16BPB1 (P3) Generated 12/21/2009 10:54 AM Page 2 of 2 4 by 0 DS15 -16B (P4) Proposal Schlumberger Report Date: December 21, 2009 Survey 1 DLS Computation Method: Minimum Curvature / Lubinski Client: BP Exploration Alaska Vertical Section Azimuth: 38.540° Field: Prudhoe Bay Unit - EGA Vertical Section Origin: N 0.000 ft, E 0.000 ft Structure 1 Slot: DS- 15/15 -16 I; StU y TVD Reference Datum: Rotary Table Well: 15 -16 ����' TVD Reference Elevation: 59.5 ft relative to MSL Borehole: Plan 15 -166 Sea Bed 1 Ground Level Elevation: 31.000 ft relative to MSL UWI/API #: 500292111502 Magnetic Declination: 22.249° Survey Name 1 Date: 15 -16B (P4) / December 18, 2009 Total Field Strength: 57693.485 nT Tort 1 AHD 1 DDI 1 ERD ratio: 269.356° / 10486.28 ft / 6.706 / 1.204 Magnetic Dip: 80.947° Grid Coordinate System: NAD27 Alaska State Planes, Zone 04, US Feet Declination Date: May 10, 2010 Location Lat!Long: N 70.29803302, W 148.57390896 Magnetic Declination Model: BGGM 2009 • Location Grid NIE YIX: N 5960630.760 ftUS, E 676088.190 ftUS North Reference: True North Grid Convergence Angle: +1.34263779° Total Corr Mag North -> True North: +22.249° Grid Scale Factor: 0.99993522 Local Coordinates Referenced To: Well Head Measured Azimuth Vertical NS EW Mag 1 Gray Directional Zone Of Zone Of Comments Inclination Subsea TVD TVD DLS Northing Easting Depth True Section True North True North Tool Face Difficulty Exclusion Exclusion (ft) I (deg) I (deg) (ft) (ft) (ft) (ft) (ft ) (deg) (deg1100ft ) Index (deg) Alert _ (ftUS) (ftUS) KOP Drp 12/100 12858.43 55.08 0.05 8494.00 8553.50 7600.29 5938.88 4742.80 170.00L 7.50 6.25 46.80 5966678.74 680690.23 12900.00 50.17 358.92 8519.23 8578.73 7625.94 5971.91 4742.52 169.32L 12.00 6.27 41.99 5966711.74 680689.17 Cry 12/100 12916.93 48.18 358.41 8530.30 8589.80 7635.77 5984.71 4742.22 2.15R 12.00 6.27 40.04 5966724.54 680688.57 12950.00 52.14 358.60 8551.48 8610.98 7655.21 6010.09 4741.56 2.03R 12.00 6.28 43.97 5966749.89 680687.32 13000.00 58.14 358.85 8580.05 8639.55 7686.72 6051.09 4740.65 1.89R 12.00 6.30 49.93 5966790.86 680685.45 13050.00 64.13 359.07 8604.17 8663.67 7720.45 6094.85 4739.86 1.78R 12.00 6.32 55.89 5966834.59 680683.64 13100.00 70.13 359.27 8623.59 8683.09 7756.06 6140.90 4739.20 1.71R 12.00 6.34 61.86 5966880.60 680681.89 13150.00 76.13 359.46 8638.10 8697.60 7793.13 6188.72 4738.67 1.65R 12.00 6.36 67.83 5966928.39 680680.24 13200.00 82.13 359.63 8647.52 8707.02 7831.28 6237.80 4738.28 1.62R 12.00 6.37 73.81 5966977.45 680678.70 13250.00 88.12 359.80 8651.77 8711.27 7870.07 6287.59 4738.03 1.61R 12.00 6.39 79.78 5967027.22 680677.29 13265.74 90.01 359.85 8652.02 8711.52 7882.35 6303.33 4737.98 - -- 12.00 6.40 81.67 5967042.95 68067 13277.08 90.01 359.85 8652.02 8711.52 7891.20 6314.67 4737.95 90.03L 0.00 6.40 81.67 5967054.29 680676. 13300.00 90.01 357.10 8652.02 8711.52 7908.74 6337.58 4737.35 90.03L 12.00 6.40 81.84 5967077.17 680675.43 13350.00 90.01 351.10 8652.01 8711.51 7944.43 6387.29 4732.21 90.03L 12.00 6.42 82.29 5967126.75 680669.13 13400.00 90.00 345.10 8652.00 8711.50 7976.26 6436.20 4721.91 90.03L 12.00 6.44 82.82 5967175.39 680657.69 13450.00 90.00 339.10 8652.00 8711.50 8003.89 6483.76 4706.55 90.03L 12.00 6.45 83.43 5967222.58 680641.22 15 -16B Tgt 1 13467.51 90.00 337.00 8652.00 8711.50 8012.51 6500.00 4700.00 89.57L 12.00 6.46 83.66 5967238.66 680634.29 13500.00 90.03 333.10 8651.99 8711.49 8027.01 6529.45 4686.30 89.57L 12.00 6.47 84.14 5967267.78 680619.91 13550.00 90.07 327.10 8651.95 8711.45 8045.38 6572.77 4661.39 89.57L 12.00 6.49 84.93 5967310.51 680593.99 13600.00 90.12 321.10 8651.86 8711.36 8058.79 6613.26 4632.08 89.58L 12.00 6.50 85.78 5967350.29 680563.75 End Cry 13621.53 90.14 318.52 8651.81 8711.31 8062.99 6629.71 4618.19 - -- 12.00 6.51 86.16 5967366.41 680549.47 WellDesign Ver SP 2.1 Bld( users) 15- 16 \15 -16 \Plan 15- 16B \15 -16B (P4) Generated 12/21/2009 11:02 AM Page 1 of 2 Measured Azimuth Vertical NS EW Mag 1 Gray Directional Zone Of Zone Of Comments Inclination Sub-Sea TVD TVD DLS Northing Easting Depth True Section True North True North Tool Face Difficulty Exclusion Exclusion (ft) I (deg) I (deg) (ft) ( (ft) (ft ) (ft ) (ft ) (deg) (deg /100ft ) Index (deg) Alert (ftUS) I (ftUS) Cry 6/100 14297.12 90.14 318.52 8650.19 8709.69 8180.05 7135.83 4170.69 40.94L 0.00 6.56 86.16 5967861.87 680090.27 14300.00 90.27 318.40 8650.18 8709.68 8180.55 7137.99 4168.78 40.94L 6.00 6.56 86.30 5967863.98 680088.31 15 -16B Tgt 2 14316.14 91.00 317.77 8650.00 8709.50 8183.23 7150.00 4158.00 HS 6.00 6.56 87.12 5967875.74 680077.25 End Cry 14346.62 92.83 317.76 8648.98 8708.48 8188.11 7172.55 4137.53 - -- 6.00 6.57 88.93 5967897.81 680056.25 Cry 6/100 14444.85 92.83 317.76 8644.13 8703.63 8203.84 7245.19 4071.58 97.05L 0.00 6.58 88.93 5967968.87 679988.63 14450.00 92.79 317.46 8643.88 8703.38 8204.65 7248.99 4068.11 97.06L 6.00 6.58 88.93 5967972.59 679985.07 14500.00 92.42 314.48 8641.61 8701.11 8211.10 7284.90 4033.40 97.20L 6.00 6.59 88.99 5968007.67 679949.53 14550.00 92.04 311.50 8639.66 8699.16 8214.98 7318.96 3996.86 97.31L 6.00 6.60 89.05 5968040.87 679912.20 14600.00 91.66 308.52 8638.05 8697.55 8216.26 7351.08 3958.58 97.41L 6.00 6.61 89.12 5968072.08 679873.19 14650.00 91.27 305.55 8636.78 8696.28 8214.95 7381.19 3918.69 97.48L 6.00 6.62 89.19 5968101.24 679832.60 14700.00 90.87 302.57 8635.84 8695.34 8211.04 7409.18 3877.28 97.54L 6.00 6.62 89.26 5968128.26 679790 14750.00 90.48 299.60 8635.25 8694.75 8204.56 7434.99 3834.47 97.58L 6.00 6.63 89.33 5968153.05 679747. 14800.00 90.08 296.62 8635.01 8694.51 8195.51 7458.55 3790.37 97.59L 6.00 6.64 89.40 5968175.57 679702.51 15 -16B Tgt 3 14810.50 90.00 296.00 8635.00 8694.50 8193.29 7463.20 3780.96 90.00L 6.00 6.64 89.42 5968180.00 679693.00 End Cry 14827.09 90.00 295.00 8635.00 8694.50 8189.54 7470.34 3765.98 - -- 6.00 6.65 89.57 5968186.79 679677.86 TD 15669.85 90.00 295.00 8635.00 8694.50 7992.29 7826.57 3002.21 - -- 0.00 6.71 89.57 5968525.00 678906.00 Survey Error Model: SLB ISCWSA version 24*** 3 -D 95.00% Confidence 2.7955 sigma Surveying Prog: MD From (ft ) MD To ( ft ) EOU Freq Survey Tool Type Borehole -> Survey 0.00 28.50 Act -Stns SLB_ZERO -Depth Only 15 -16 -> 15 -16 28.50 4588.50 Act -Stns SLB_CNSG +CASING 15 -16 -> 15 -16 4588.50 4900.00 1/100.00 SLB_INC +TREND Plan 15- 16BPB1 -> 15- 16BPB1 (P3) 4900.00 12497.59 1/100.00 SLB_MWD +GMAGA 1 Plan 15- 16BPB1 -> 15- 16BPB1 (P3) 12497.59 12858.43 1/100.00 SLB_MWD +GMAG^ ^2 Plan 15- 16BPB1 -> 15- 16BPB1 (P3) 12858.43 15669.85 1/100.00 SLB_MWD +GMAG^^2 Plan 15 -16B -> 15 -16B (P4) Legal Description: Northing (Y) fftUS1 Easting (X) fftUS1 Surface : 4426 FSL 5115 FEL S22 T11N R14E UM 5960630.76 676088.19 15 -16B Tgt 1 : 364 FSL 401 FEL S10 T11N R14E UM 5967238.66 680634.29 TD / BHL : 1691 FSL 2096 FEL S10 T11N R14E UM 5968525.00 678906.00 III I Well0esign Ver SP 2.1 Bld( users) 15- 16 \15 -16 \Plan 15- 16B \15 -16B (P4) Generated 12/21/2009 11:02 AM Page 2 of 2 1 by 0 Schlumberger • VVELL DS15- 16BPB1 (P3) / 15 -16B (P4) FIELD Prudhoe Bay Unit - EOA I STRUCTURE DS -15 Magnetic Parameters Surface Location NAD27 Nada Slate Planes. Zone 04 US Feet MlecaUaneous Mode). BOW 2009 De. 80 947° Date May 10. 2010 Laf N70 11 52.919 Northing. 596063018 ftUS Grid Conv'. •1.34263779° I Std: 15 -16 TIM Ref Rotary Table (59S0 fl above MSL) Mag Dec: 422.249° FS. 576935 nT Lon: W146 34 26 012 Fasting: 8]8088.19 flUS Scale Fad 0.9999352238 Plan. 15 -168 (P4) Sny Date: December 18. 2039 600 1200 1800 2400 3000 3600 - __.._. ; iff l.( PAL.._.._ .._..:.._.._.._.._.._.._.._.._. _.._.._.._.._.._.._.._.._i _.._.._.._.._.._.._.._.._ .... ._.._.._.._.._.._.._.. T" C _g , _o_ ..- ....- ..- .....a. 1000 2000 3C _ .. H A AP.RlP :::_ : ::::::_:::::- __::_::: .. __.._.._- .._.._..— .. -..- : _.._.._.._.._.._.._. . -p_.._..—..-....._..—.....- o _ .._. _.. isiigp ._.._.._.._.._.._.._.._. _.._.._.._.._.._.._. ._.._3_.._.._.._.._.._.._.._.._ . r 8400 5400 951P' Csg 15.788 T t 1 15 -16B Tgt 2 15-168 P4 • 4000 T4o4ri&way .:-:. • 16 To)) Whipstock _. — — .. . —.:_:: .�:._._.. _..�.._.. �. = ;; CrvbNg; : _: :tee. .. .. .. e. e. .. •_.._.._.._.: a :: .._. _ Bas Whipstock II ._ �.. .._.. �._.._.._.. _.._. _.._.. _.._ .._.._.._ _.._.._.. _.._.._.._.._.._ ._.._.._.._.._.. _.._. _. 'Cry 4/100 a) _.._.._.. a.. � F.. 1 .t. Cry 4/100 8 : : : : : : : ::1: _:: :.._.. :.._ :4,,,. . _ _ .. _ .. _ .e_.:_.. _ .. _ .:1 _.._.. _ .._.._.._.. _.._._.._.._.._.._.._..:.._..�. CO 15 -16A S End Cry Cry -..- .._........ -.._.. _..... -.._.. _. ❑ 15 Cry 6/100 15168 Tgt 3 a 7•• Ln 15-16BPB1 (P3) _.._.._.._.._..,.._.._.._ _.. 9000 9000 5000 e .._ .._.. }.._.._.._.._.._.._.._.._. .. _.._.._ .._.._..s.._.._.._.._.._.._.._. _.._.._. 600 1200 1800 2400 3000 3600 a Vertical Section (ft) Azim = 315 ° , Scale = 1(in):600(ft) Origin = 0 N / -S, 0 E / -V o 6000 -..-..-..-..-.. 7 ..-.._.._.._. .- ..- .._..- .._.._.._.._.. -.._.. ---. , ..- .._.._.._.._.._.. -.._ .-.._..-.._..-.._.._.._.. s.._.._.._.._..-.._.._ ..- 1.._.._.._.._.._.._.._.._. 6000 c _.._.._.._.._.._.._.._.._.._.._.._.._ .._.._.._.._.._.._.._.._.._.._. _.._ .._ .._.._.._.._..___.._.._.._.._.. _. _.._ ._.._.._.._.._.._.._.._.._.._.._.._.._.._.._.._ .._.._.._.._.._.._.._.._.._.._. co B 0 T o-.._.._.._.._.._.._.._.._.._.._.._.._ .._.._.._.._.._.._.._.._.._.._. _.._.._.._.._.._.._.. ..___.._.._.._.._....._.._.._ ._.._.._.._.._.. .._.._.._.._.._.._.._.._.._ .._.._.._.._.._.._.._....._.._. rn Cry 4/100 • O 7000 7000 > I— _.._.._.._.._..-.._.._.._.._.._.._.._..-.._.._.._.._.._.._.._.._.._. _.._.._.._.._.._.._.._.._ _.._.._.._.._.. ._.._...._.._.._.._..- .._.._.._ . �.._.._.._.._.._.._.._ . ; i . _.._.._.._.._.._.._.._. _..-.._.._.. e. 1.I I....... 14. II. I ..r.i.4.41}r4.r.eeeess.l.r..reS eer.1 _...... 11. 41.rr.. .-.1.11.P...S...11-I4........ ..e)re ..-11.II.I.■....1. 1481 .......S1..I1-Il..r_r.S 0. ,..,_ I...._... 8000 8000 _ o - .._. .._.._.._. ._.._..:._ _c .._.._.._.._.._...._ .._.._.._.._.._.._.._..►.._.._ per 8 •_•• ••_••_• N7YrErSap7arg it _•BWL25l.100.._.. x s _ y: iy i _ ' r - - : : : :• -••-:• --::::::::::::::::::::::::::t:::::::=" _.. ,-,. C - _.. e.. e.._.._ EE"; ii_ Ei_::_ i :_Ei_:i_::_:E_EE�ii_ii_::a::_ _;i_; _�_ - � �ndgl: : Vin.... ,. t�1 i ; A ' • 15-16 Drp 121100 9000 • T- Lnr TD 9000 1000 2000 3000 4000 5000 6000 7000 Vertical Section (ft) Azim = 38.54 ° , Scale = 1(in):1000(ft) Origin = 0 N / -S, 0 E / -V by s • 0 Schlumberger ALL DS15- 16BPB1 (P3) / 15 -16B (P4) FIELD Prudhoe Bay Unit - EOA I STRUCTURE DS -15 Magnetic Parameters Surface Lora9on 04027 Alaska State Planes. Zone 06. US Feet Miswllaneoua Model: BM GG 2009 Dip'. 80.947° Date: May 10. 2010 let: N701752.919 Northing 5960630.76 SUS Gnd Cony: .1.34263779° S41 15-16 TVO Ref Rotary Table (59500 above MSL) Slag Dec .22.249° FS: 57693.5 nT Los W148 34 26 072 Easdng: 676088.19 SUS Scale Fad: 09999352236 Plan: 15-168 (P4) Sos Data December 18, 2009 0 1000 2000 3000 4000 5000 • 8000 8000 ittitti 4 41 4 Ent) Cry 15 -1613 Tgt 3 TO Cry 6/100 • End Cry 15 -166 ;It 15-1613 Flt 2 8660s - � Cry 7000 N ••1s- 16141tc8680ss 7000 f a ® E nd Cry ■ _ 1111i, j5-1613 Tgt1 Ste ¢ liki 15-166 Flt 3 86$Os . 15-16BPB1 (P31 prp 141100 To 6000 gnidld IP Cry 12/100 6000 15-168 Flt 1 3660ss Bed 7.25/100 Fault KOP Drp 12/1 )0 :7" Csg P' b ag Targert / End Cry r Lnr 5000 Pryr' 16 5000 A /� A A Z 8 o 0 o ' -5/8" Ca4 5 4000 + 4000 //I a a) u) 15-16A CO v v v 3000 3000 2000 2000 End Cry 1000 1000 Cry 41100 0 0 13 -3/8" Csg 0 1000 2000 3000 4000 5000 «< W Scale = 1(in):1000(ft) E »> - • BPPASSPORT AnticoIIision Report Company: North America - ALASKA - BP Local Co- ordinate Reference: Well 15 -16 Project: Prudhoe Bay TVD Reference: 15 -16B Plan @ 59.50ft (Nabors XES) Rule,ences PE DS -45 — MD Reference; -- 15.16B @ 59:50ft (Nabors - XES) — Site Error: 0.00ft North Reference: True Reference WeD: -- 1 -5 -16 - - - - - -- Minimum - Curvature -- Well Error: 0.00ft Output errors are at 1.00 sigma Reference Wellbore Plan 15-16B EDM.16 - Anc Prod - WH24P Reference Design: Plan #4 15 -16B Offset TVD Reference: Offset Datum Reference Plan #4 15 -16B Filter type: GLOBAL FILTER APPLIED: All wellpaths within 200'+ 100/1000 of refer - a t n erva . Error Model: ISCWSA Depth Range: 4,600.00 to 15,669.85ft Scan Method: Tray. Cylinder North —Results-Limited-by: Maximum- centeFCenter distance ef 1- ,764.14ft Error-Surface —El -Conic 1 Survey Tool Program —Date 12/3/2009 — From To 00 (ft) ":^ Survey (Wetlbore) — Tool - Name — Description 88.50 4,587.50 15 -16 Srvy 2 GYD CT CMS (15 -16) GYD -CT -CMS Gyrodata cont.casing m/s 4,588.50 4,899.00 Plan #3 15-16BPB1 (Plan 15- 16BPB1) MWD MWD - Standard 4,900.00 12,500.00 Plan #3 15- 16BPB1 (Plan 15- 16BPB1) MWD +IFR +MS MWD + IFR + Multi Station 1 Plarr#3 1 -16BPB1 (Plan 15 MWDitFR+MS -- MWD - + - IFR +AvlultiStation 12,858.43 15,669.85 Plan #4 15-16B (Plan 15 -16B) MWD +IFR +MS MWD + IFR + Multi Station 12/21/2009 10:49:08M Page 2 of 5 COMPASS 2003.16 Build 71 - ft BPPASSPORT IV Afiticollision Reporf Company: North America - ALASKA - BP Local Co- ordinate Reference: Well 15 -16 Project: Prudhoe Bay ND Reference: 15 -16B Plan @ 59.50ft (Nabors XES) Reference Site. 11 DS - -- - MD - Reference: - - - - - 15 - Plam@ 59:50ft - XES) - - - Site Error: 0.00ft North Reference: True __ Ref W - - - -- 1546 ------------- - - -__. - - - - - Survey- Caieuiati l Minimum- Curvature Well Error: 0.00ft Output errors are at 1.00 sigma Reference Welibore Plan 15-16B - -__ Database: EDM _16 - Anc Prod - WH24P Reference Design: Plan #4 15 -16B Offset ND Reference: Offset Datum Summary Reference Offset Centre to No-Go Allowable Measured Measured Centre Distance . Deviation Warning Site Name Depth Depth Distance (ft) from Plan - --Offs - (It) (ft) -- (ft) - (ft) PB DS 15 15 -04 - t5 -04 - 15-04 - Out of range 15-04 - 15 -04A - 15-04A Out of range 15 -04 - 15-04B - 15-046 Out of range 15 -04 - 15- 04BPB1 - 15- 04BPB1 Out of range 15 -05 - 15 -05 - 15 -05 Out of range 15 -05 - 15 -05A - 15 -05A Out of range 15 -05 - 15- 05APB1 - 15- 05APB1 Out of range 15 -06 - 15-06 - 15-06 4,600.00 5,225.00 1,104.28 116.35 988.78 Pass - Major Risk 15-06A - 15-06A - 15 -06A 4,600.00 5,225.00 1,104.28 116.35 988.78 Pass - Major Risk 15- 06APB1 - 15- 06APB1 - 15- 06APB1 4,600.00 5,225.00 1,104.28 116.35 988.78 Pass - Major Risk 1- 5- 1- 6---- 15- 15--- 15- 1.6 - - - - -- - - -- 460&511 4 ,620,00 -0- ,09 - -- 1.50 -- - 1.23 - _FAIL-- Major-Risk 15-16 - 15 -16A - 15 -16A 4,608.50 4,620.00 0.09 1.50 -1.23 FAIL - Major Risk 15 -16 - Plan 15- 16BPB1 - Plan #3 15- 16BPB1 13,162.55 13,160.00 1.33 7.32 -3.44 FAIL - Major Risk 15 -17 -1547 -15=4T - - 4,600.00 340.12 78.75 261./2 -a §s = Major Risk 15-18 - 15-18A - 15-18A Out of range 15 -19 _1.5-19 15-19 ___ 4.601.8D___- 4,980 00 784.89 59.21 734.88__ ass-- Major Risk 15 -19 - 15 -19A - 15-19A 4,601.80 4,980.00 784.89 59.21 734.88 Pass - Major Risk 15 -26 - 15 -26 - 15 -26 4,623.98 5,350.00 1,264.17 59.69 1,213.95 Pass - Major Risk 15-26 - 15 -26A - 15-26A 4,623.98 5,350.00 1,264.17 59.69 1,213.95 Pass - Major Risk 15-26 - 15 -26B - 15-26B 4,625.13 5,345.00 1,265.41 59.69 1,215.19 Pass - Major Risk 15 -27 - 15-27 - 15-27 4,601.14 4,830.00 633.17 51.77 585.12 Pass - Major Risk 15 -27 - Plan 15-27A - Plan #2 15-27A 4,600.00 4,650.00 482.55 53.51 431.15 Pass - Major Risk 15 -27 - Plan 15- 27APB1 - Plan #1 15.27APB1 4,600.00 4,650.00 482.55 53.51 431.15 Pass - Major Risk 1-5=30- -15-30 - 15 -30 - - 1-Z680.88 -1 2,335.00 -1 045.G4 415.77 63&27 Pass-Major-Risk - -- 15-30 - 15-30A - 15-30A 12,619.88 12,245.00 1,144.10 413.60 737.96 Pass - Major Risk 15-30 - 15- 30APB1 - 15- 30APB1 12,600.00 12,100.00 909.36 409.77 524.49 Pass - Major Risk 15 -33 - 15 -33 - 15-33 4,600.00 4,975.00 1,205.81 77.78 1,131.63 Pass - Major Risk 15 -33 - 15 -33A - 15-33A 4,600.00 4,975.00 1,205.81 77.78 1,131.63 Pass - Major Risk 15 -33 - 15 -33B - 15-33B 4,600.00 4,975.00 1,205.81 77.78 1,131.63 Pass - Major Risk 15 -33 - 15 -33PB1 - 15-33PB1 4,600.00 4,975.00 1,207.21 77.80 1,133.03 Pass - Major Risk 15-33 - 15 -33PB2 - 15 -33PB2 4,600.00 4,975.00 1,207.21 77.80 1,133.03 Pass - Major Risk 'F5=36 - = '15-36=15-36 V458.73 7,895:00 T36.38 -- 184.05 - 36.93 - FAIL = Major Risk 15-36 - 15 -36A - 15-36A 8,458.73 7,895.00 136.38 184.05 -36.93 FAIL - Major Risk -_ - -- 15-36-1 5- 36APB1- 15-16API31 8,458.73 - _1,89& -- - -- -136 38 18405 _36.93-- --FAIL Major R'sk 15 -36 - 15 -36B - 15-36B 8,459.81 7,895.00 136.56 184.08 -36.93 FAIL - Major Risk 15-36 - 15- 36BPB1 - 15- 36BPB1 8,459.81 7,895.00 136.56 184.08 -36.93 FAIL - Major Risk - 15-36 - 15 36BPB2 =1- 36BPB2 8,459.81 7,895.00 136 56 - 1 - 84.08 36` FAIL = MajarRisk - 15-37 - 15 -37 - 15-37 7,150.81 6,695.00 178.63 155.17 31.87 Pass - Major Risk 15 -37 - 15 -37A - 15- 37A 7,150.81 6 695.00 178.63 155.08 31.66 Pass - Maier Risk 15 -37 - 15- 37APB1 - 15- 37APB1 7,150.81 6,695.00 178.63 155.08 31.66 Pass - Major Risk 15-37 - 15 -37B - 15-37B 6,666.02 6,270.00 225.05 107.62 123.25 Pass - Major Risk 15-41 - 15-41 - 15-41 4,600.00 4,665.00 698.03 117.69 629.74 Pass - Major Risk 15-41 - 15-41A - 15-41A 4,600.00 4,665.00 698.03 117.69 629.74 Pass - Major Risk 15-41 -15-41B-15-41B 4,600.00 4,665.00 698.03 117.62 629.75 Pass - Major Risk 15-41 - 15-41 BPB1 - 15-41 BPB1 4,600.00 4,665.00 698.03 117.60 629.75 Pass - Major Risk 15-41 - Plan 15 -41C - Plan #1 15-41C 4,600.00 4,605.00 713.55 395.98 610.05 Pass - Major Risk 15-43-1-5-43-15-43- -- 4,600.00 4,940,00 - -- 650 59:19 - -- 600.36- Pass- -Major -Risk 15-44 - 15-44 - 15-44 6,813.77 6,115.00 725.12 168.67 561.12 Pass - Major Risk 15-48 - 15-48 - 15-48 4,628.29 5,580.00 1,604.13 52.37 1,558.04 Pass - Major Risk 15-48 -15 -481-= f5-43A 4,628.29 5,5 00 1,604.13 52.37 1,558.04 Pass - Major Rim - - 15-48 - 15-48B - 15-48B 4,628.29 5,580.00 1,604.13 52.37 1,558.03 Pass - Major Risk 15--49 - x-549- -15.49 - - -_4,6113 94_4,445.00__519,79 82 97 54634_ Pass-Major R'sk - - - -- 15-49 - 15-49A - 15-49A 4,603.94 4,445.00 619.79 82.97 546.34 Pass - Major Risk 12/2172009 10:49:68AM Page 3 of 5 COMPASS 2003.16 Build 71 AD BPPASSPORT AWibollision Report Company: North America - ALASKA - BP Local Co-ordinate Reference: Well 15-16 Project: Prudhoe Bay ND Reference: 15-16B Plan @ 59.50ft (Nabors XES) ReerencSite. PB DS15 MD Reference. -- (Ndbuis XES) Site Error: 0.00ft North Reference: True Reference-Welk- 1-5-14 -Survey-Calculation-Methock—Minimumeurvature- Well Error: 0.00ft Output errors are at 1.00 sigma Reference Wellbore Plan 15-16B Database: EDM .16 - Anc Prod - WH24P Reference Design: Plan #4 15-16B Offset ND Reference: Offset Datum Summary Reference Offset Centre to No-Go Allowable Measured Measured Centre Distance Deviation Warning Site Name Depth Depth Distance (ft) from Plan —Offsetiffelt-Wellbore-Design- -- (ft) - 04 "------ (ft) — (ft) - ---- PB DS 15 15-49 - 15-49APB1 - 15-49A 4,603.94 4,4451)0 82.97 546.34 Pass - Major Risk 15-49 - 15-49B - 15-49B 4,603.94 4,445.00 619.79 83.01 546.47 Pass - Major Risk 15-49 - 15-49PB1 - 15-49PB1 4,603.94 4,445.00 619.79 82.97 546.34 Pass - Major Risk PB State PBST01 - PBSTO1 - PBSTO1 15,432.68 8,965.00 1,685.16 17,107.94 -15,167.93 FAIL - Major Risk - f2723 72009 Page 4 of 5 COMPASS 2003.16 Build 71 • Project: Prudhoe Bay . Site: PB DS 15 Well: 15 -16 Wellbore: Plan 15 -16B Design: Plan #4 15 -16B From 4600'md to TD Scan interval 100 ft Scale 1:50 15 - Fail major risk 0 ... iiii i i\ 30 330 r 300 4 . � ..: '� � 0 � � /5(\40111111111161111111■,,r.,:,t 998 # . A , 2 1 --- i6/ 36BP:•8 Il .` 1 i -:..11411111 Ili %._ V 144111V41* * -4 )10- A itii 4 Al* 4400 ilfte *.t.Avoll 60 l ik witi,..-7, A AMOY" 1 Atti 4144, 111 1100 thil",110 i r . 4 I k AP4) 4 0 , 4,„ ii „,,, A. ,,,,,,,,,, I , 4 270 ti4. i A . �% 5280 k- ' r•'; AM. A ■ ∎ l lA._ p- 90 i ..'. r_4,70 * AMIN- ":Anti: • „rm._ _ _. _ 240 - 120 11 1' - 150 - - itb 180 Travelling Cylinder Azimuth (TFO +AZI) ( °] vs Centre to Centre Separation [50 ft/in] . 4' BPPASSPORT - 40 , Ariticalliion Report Company: North America - ALASKA - BP Local Co-ordinate Reference: Well 15-16 Project: Prudhoe Bay TVD Reference: 15-16B Plan @ 59.50ft (Nabors XES) Reference PB DSIS MD Refei voice. 1 XES) • Site Error: 0.00ft North Reference: True RefereneeWell------1-5--1-6 _ --SurveyCaleulatien-Methodf- Minimum-Curvature-- Welt Error: 0.00ft Output errors are at 1.00 sigma Reference Wellbore Plan 15-16B Database: EDM .16 - Anc Prod - WH24P Reference Design: Plan #4 15-16B Offset TVD Reference: Offset Datum Reference Plan #4 15-16B Filter type: NO GLOBAL FILTER: Using user defined selection & filtering criteria InterpolatiOn MethcYd: MD filtervalSOOtt Error Model: ISCWSA Depth Range: 4,600.00 to 15,669.85ft Scan Method: Tray. Cylinder North —Results-Limited-by: -Maximum-center-center distancc of 1,764.14ft Error-Surface —Bliptical-Conic- Survey Program -- Date 12/3/2009 1 -I_ From To I (ft) (ft) -- Srvey (Weilbore) root Name DescriptiOn 88.50 4,587.50 15-16 Srvy 2 GYD CT CMS (15-16) GYD-CT-CMS Gyrodata cont.casing m/s 4,588.50 4,899.00 Plan #3 15-16BPB1 (Plan 15-16BPB1) MWD MWD - Standard 4,900.00 12,500.00 Plan #3 15-16BPB1 (Plan 15-16BPB1) MWD+IFR+MS MWD + IFR + Multi Station 1 t250Cr.00 1 MWD + IFR +-lvlulti-Station— -I 12,858.43 15,669.85 Plan #4 15-16B (Plan 15-16B) MWD+IFR+MS MWD + IFR + Multi Station Summary _ Reference Offset Centre to No-Go Allowable Measured Measured Centre Distance Deviation Warning -- Sft - WaiirTe ---- mtan Depth Distance (ft) from Offset Well - Wellbore - Design (ft) (ft) (ft) (ft) PB DS 15 15-36 - 15-36 - 15-36 8,365.42 7,795.00 125.70 53.04 78.80 Pass - Minor 1/200 15-36 - 15-36A - 136A 8,365.42 7 _7(45.00_ 125.I� 53.04 78 80 Pass - Minor 1/900 15-36 - 15-36APB1 - 15-36APB1 8,365.42 7,795.00 125.70 53.04 78.80 Pass - Minor 1/200 15-36 - 15-36B - 15-368 8,366.49 7,795.00 125.76 53.05 78.80 Pass - Minor 1/200 15-36 - 15-36BP8t-1 8,366.49 7,795.00 125.76 53.05 78.80 -- Pass - Minor 1/zu0 15-36 - 15-36BPB2 - 15-36BPB2 8,366.49 7,795.00 125.76 53.05 78.80 Pass - Minor 1/200 PB State PBSTO1 - PBSTO1 - PBSTO1 15,432.68 8,965.00 1,685.16 17,107.94 -15,167.93 FAIL - Major Risk — 12/217200 - 9 - 1 - a5617 Page 2 of 3 COMPASS 2003.16 Build 71 Project: Prudhoe Bay • Site: PB DS 15 Well: 15 -16 Wellbore: Plan 15 -16B Design: Plan #4 15 -16B From 4600'md to TD Scan interval 100 ft Scale 1:50 15 -36 Pass Risk 1 :200 0 330 , / ' • „ 30 ilea t ^6/15- 36BPB2S _ 6 * -- I \ .. iii' _ ^ � � � � �, ,, 300 ,/ 60 yorsio4ii f OP 270 _ l Ar ,. , 087 . :'” A"■•• 52 • .i -:!.• 90 ' � 5377 5473 51' 16/Pian #3 15- 16BPB1 15.16!15.16A 240 120 Iii 210 150 — .mom= ilill•••••• 180 Travelling Cylinder Azimuth (TFO +AZI) [ vs Centre to Centre Separation [50 ftfin] 0 U ' j p 0V 0 N.) CO -F 0 CT N.) CO -F 0 0 0 C3 0 0 0 CD 0 0 0 0 0 0 0 . al 0 ] 0 9S maimmilim MillagEMIN III INIIIMI • & 1C09 . , . , .‘,... ..,,., 111 ., .\ , .111111M 11111.11111111111 1089 „ ....„, • ,, alliMI 0L 1111111•=11111 . MINIIIMIIIII II_ ... III JOL - III ._. 1 1008 II 0 - ii• • ..I..m•••••o•mI■N.......m..mm.Jill 11111111MMIMMIMIII. , 1 , , • . . . , ; . . . • / / / \ \ . , • , , . , \ , : . . • 4, . , 7 \ \ \ • . . . . . , I , . ,. • . . / / / \ \ , .. . • / , • :plod g nogito,i :adcpc /119) RI Xi •11/1 wapluoi N loOPTC SI .11/ :apniuri • 1.1 , SO , X S° ■ 11 1 1C19 :S••,N+1,0s1 II 0011/41996C SWUM d.1N _ iamutu5,LNAD. • Aso 0:zscawo moolduasKI FI91-51 bit 1 P0 .0 Panfl 56 11101 laic 1 g1.11.1(1 • ___ Apa g9i-ci P I 1REE = WELLHEAD 4 - 1116" FMC GFMC • 1 5-1 6A PULL ED 8 WELL AN(LE�> 70° 1700' & > 90° ATCH @ ACTUATOR = AXELSON - l 11763'. CMT S AGE RS 0 13524 -13649 NOTED X CTD. kB. ELEV = 71.0' BF. ELEV = NA 69' H 4 -112" X 3-1/2" TBG XO, Co = 2.992" I KOP = 3000' Max Angle = 98 @ 12787' 2235' 3- 112" CAMCO TRDP 1A TRSSSV, ID = 2.812" Datum MD = LOCKED OUT 08/15/01 Datum TVD = 8800' SS 0 GAS LFT MANDRELS ST MD TVD DEV TYPE VLV LATCH PORT DATE 1 2854 2853 7 MMG DMY RK 0 09/07/09 i 2 4364 4235 42 MMG DMY RK 0 05/21/95 i 13-3/8" CSG, 72 #, L -80, ID = 12.347" H 2495' 3 5920 5230 50 MMG DMY RK 0 09/07/09 4 7164 5989 51 MMG DMY RK 0 L 5 8069 6534 53 MMG DMY RK 0 6 8566 6835 52 MMG DMY RK 0 Minimum ID = 1.920" @ 10802' 7 8964 7081 52 MMG DMY RK 0 TOP OF 2 -3/8" LINER 8 9458 7392 50 MMG DMY RK 0 9 9830 7634 48 MMG DMY RK 0 10 10107 7823 46 MMG BD DMY RKED 0 CI-EM INJ MANDRB_ (S1 1 10168 56) D 9 � VLV 2 T 105/14/95` 13 -1/2" TBG, 9.3 #, L -80, .0087 bpf, C= 2.992" I I BKR SEAL BORE EXT, ID = 4.750" H 10247' I X� 10243' H 9 -518" X 4-112 BKR 13 PKR, ®= 4.750" I 4 -1/2" BKR SEAL ASSY, ID = 3.875" H 10259' 11 10280' H 3 -1/2" OTIS X NP, ID = 2.813" I PRODUCTION MANDRELS ST MD TVD DEV TYPE VLV LATCH PORT DATE L 12 10353 7979 58 MMG EMPTY 13 10443 8039 60 MMG EQ DMY_ RKP _ l TOP OF 7" LI■AR H 10492' J-- 1 l 1 L LV 10795' H 2.70" 11W DEPLOYMENT S, O = 2.250" I II. 10802' H TOP OF 2 -3/8" 4.7# LNR, ID = 1.920" I I--- I 9 -5/8" CSG, 47 #, L -80, ID = 8.681" H 10850' , PERFORATION SUMMARY 3 -1/2" TBG & r LNR NILLOUT WI+IDOW REF LOG: SWS MEMORY GR/CNL ON 11/18/01 11536' 11542' A NGLE AT TOP PERF: 95 @ 11825' Note: Refer to Production DB for historical pert data SIZE SPF INTERVAL Opn /Sqz DATE \ 11536' I--I j WHFSTOCK I 1.56" 6 11710 - 11830 0 07/21/08 rip/A:6 11541' H RA TAG I 1.56" 6 11825 - 11900 0 02/18/05 1.56" 6 11920 - 11940 0 07/21/08 1.56" 6 11975 - 12160 0 11/25/03 1.56" 6 12160 - 12280 0 07/21/08 1.56" 6 12320 - 12355 0 11/25/03 PBTD 1 I 1.56" 4 12680 - 12830 0 11/19/01 1.56" 4 12870 - 12970 0 11/19/01 1.56" 4 13120 - 13155 0 11/19/01 ■ 1.56" _ 4 13245 - 13518 0 11/19/01 I 3-1/2" TBG, 9.3 #, L -80, ID = 2.992" H 11709' '1 1 � t . L 7" LNR, 29#, L -80, ID = 6.184" 11848' 111111111 • • • • 1111 ���. 1111111111111111 -we 1 To H 11891' I ••••••• I 2 -3/8" LNR 4.7 #, L -80, .0039 bpf, iD = 1.920' 13715' DATE REV BY COMMENTS DATE REV BY COMMENTS PRUDHOE BAY UNIT 06/30/84 ORIGINAL COMPLETION 11/25/03 BJMcMITLP ADD PERFS WELL: 15 -16A 11/18/90 __ LAST_ -- WORKOV ER 03/05/05 JLG/TLH ADD PERFS PERMIT No: F 2011920 11/20/01 CTD SIDETRACK 07/21 /8 DMS /SV ADD PERFS API No: 50- 029 - 21115 -01 12/31/01 CH/TP CTD SIDETRACK 09/28/09 CJN/SV GLV C/O (09/07/09) SEC 22, T11N, R14E853' FNL 8 165 FWL t 10/04/01 JBM/KK CMT; XXN PLUG; TBG PUNCH 11/07/01 DTR/TLH WHIPSTOCK & EMPPY GLV BP Exploration (Alaska) 4 TREE = 4 - 1/16" FMC GEN 3 15 -16A SAFETY NOTES: KNOWN LEAK @ GLM #13 - 10443' (PATCH WELLHEAD = FMC • PULLED 08/23 WELL ANGLE > 70° @ 11700' & > 90° @ ACTUATOR = AXELSON PreRiq C ) 11763'. CMT S NGERS F/ 13524 - 13649 NOTED X CTD. KB. ELEV = 71.0' BF. ELEV = NA 69' H 4 -1/2" X 3 -1/2" TBG X0, ID = 2.992" I KOP = 3000' Max Angle = 98 @ 12787' 2235' F 3 -1/2" CAMCO TRDP -1A TRSSSV, ID = 2.812" Datum MD = O LOCKED OUT 08/15/01 N Datum D = 8800' SS GAS LIFT MANDRELS 13 -3/8" CSG, 72 #, L -80, ID = 12.347" H 2495' I ' ST MD ND DEV TYPE VLV LATCH PORT DATE 1 2854 2853 7 MMG DMY RK 0 09/07/09 Minimum ID = 2 4364 4235 42 MMG DMY RK 0 05/21/95 Tubing Jet Cut H 5000' I "" I TOC I—I 9300' I C Li 3 -1/2" TBG, 9.3 #, L -80, .0087 bpf, ID = 2.992" I I BKR SEAL BORE EXT, ID = 4.750" H 10247' I 10243' H 9-5/8" X 4 -1/2" BKR D PKR, ID = 4.750" I 4 -1/2" BKR SEAL ASSY, ID = 3.875" H 10259' I I 10280' H 3 -1/2" OTIS X NIP, ID = 2.813" I L TOP OF 7" LNR H 10492' I---3 10795' H 2.70" TM/ DEPLOYMENT SLV, ID = 2.250" I 10802' H TOP OF 2 -3/8" 4.7# LNR, ID = 1.920" I I 9 -5/8" CSG, 47 #, L -80, ID = 8.681" H 10850' I - 4 I. PERFORATION SUMMARY REF LOG: SWS MEMORY GR/CNL ON 11/18/01 ANGLE AT TOP PERF: 95 @ 11825' Note: Refer to Production DB for historical pert data 11536' WHIPSTOCK SIZE SPF INTERVAL Opn /Sqz DATE 1.56" 6 11710 - 11830 0 07/21/08 ♦���♦ 11541' RA TAG I 1.56" 6 11825 - 11900 0 02/18/05 '1'1''1'1' 1.56" 6 11920 - 11940 0 07/21/08 1.56" 6 11975 - 12160 0 11/25/03 - 1.56" 6 12160 - 12280 0 07/21/08 1.56" 6 12320 - 12355 0 11/25/03 @ ��l 1.56" 4 12680 - 12830 0 11/19/01 Si* PBTD H 13649' 1.56" 4 12870 - 12970 0 11/19/01 1.56" 4 13120 - 13155 0 11/19/01 � ` 1.56" 4 13245 - 13518 0 11/19/01 1 3 -1/2" TBG, 9.3 #, L -80, ID = 2.992" I 11709' ►1n1�1�111 _ ���_� 7" LNR, 29 #, L -80, ID = 6.184" 11848' 111 ■�� ►11111111 • ��. 1 1 1 �. 1 11111111 1 TD I 11891' W.1.1A.1.1A 2 -3/8" LNR, 4.7 #, L -80, .0039 bpf, ID = 1.920" I 13715' DATE REV BY COMMENTS DATE REV BY COMMENTS PRUDHOE BAY UNIT 06/30/84 ORIGINAL COMPLETION 11/25/03 BJMcM/TLP ADD PERFS WELL: 15 -16A 11/18/90 LAST WORKOVER 03/05/05 JLG/TLH ADD PERFS PERMIT No: '2011920 11/20/01 CTD SIDETRACK 07/21/08 DMS /SV ADD PERFS API No: 50- 029 - 21115 -01 12/31/01 CH/TP CTD SIDETRACK 09/28/09 CJN/SV GLV C/O (09/07/09) SEC 22, T11N, R14E853' FNL & 165' FWL 10/04/01 JBM/KK CMT; XXN PLUG; TBG PUNCH 11/07/01 DTR/TLH WHIPSTOCK & EMTPY GLV BP Exploration (Alaska) I TREE= 4- 1/16" FMC GEN 3 15 -16B WELLHEAD= FMC • SAFETY NOTES. ACTUATOR = AXELSON KB. ELEV = 71.0' BF. ELEV = NA KOP = 3000' O 2200' I—I 4 -1/2" HES X Nip, ID 3.813" Max Angle = Datum MD = Datum TVD = 8800' SS GAS LIFT MANDRELS ST MD TVD DEV TYPE VLV LATCH PORT DATE 1 2 ' 3 13 -3/8" CSG, 72 #, L -80, ID = 12.347" H 2495' FA L 4 Minimum ID = 5 El 4450' 1-17" Liner Hanger /LTP 11481' I — I Top of Intermediate Cement I HES EZSV I—{ 4600' I I 12210' H4-1/2" HES X Nip, ID 3.813" Jet Cut h 5000' I g 11 Z 12240' H7" x 4 - 1/2" HES TNT PKR ID= 3.870" I I I 12270' H4 -1/2" HES X Nip, ID 3.813" 3 -1/2" TBG, 9.3 #, L -80, .0087 bpf, ID = 2.992" C ij I I I 12300' H4-1/2" HES XN Nip, ID 3.725" ii I 12330' H4 -1/2" TBG, 12.6# , VAMTOP 13 CR - I B KR 5 "x7" Hanger/ LTP ID 4.193" 12330' H 9 TOP OF 7" LNR I—I 10492' _I J I 1 I 12481' I - 17" Csg, 26 #, L -80, TCII ID= 6.276" I I 1 L I 9 -5/8" CSG, 47 #, L -80, ID = 8.681" H 10850' I-4 '► PERFORATION SUMMARY REF LOG: ANGLE AT TOP PERF: Note: Refer to Production DB for historical perf data SIZE SPF INTERVAL Opn /Sqz DATE � 1 t • .ilia. ►� ." 15650' H 4 -1/2" Liner, 12.6 #, L -80, ID = 3.813 I 15 -16A I Y 1 3 -1/2" TBG, 9.3 #, L -80, ID = 2.992" H 11709' /maw m r•Paq 1 7" LNR, 29 #, L -80, ID = 6.184" H 11848' I L I IAAA1 � 1�1�1�1�1 • 15 - 16 TD I 11891' 2 -3/8" LNR, 4.7 #, L -80, .0039 bpf, ID = 1.920" I-I 13715' I DATE REV BY COMMENTS DATE REV BY COMMENTS PRUDHOE BAY UNIT 06/30/84 ORIGINAL COMPLETION 11/25/03 BJMcM/TLP ADD PERFS WELL: 15 -16B 11/18/90 LAST WORKOVER 03/05/05 JLG/TLH ADD PERFS PERMIT No: 11/20/01 CTD SIDETRACK 07/21/08 DMS /SV ADD PERFS API No: 12/31/01 CH/TP CTD SIDETRACK 09/28/09 CJN/SV GLV C/O (09/07/09) SEC 22, T11 N, R14E 853' FNL & 165' FWL 10/04/01 JBM/KK CMT; XXN PLUG; TBG PUNCH 10/05/09 AMW Proposed Driling Sidetrack 11/07/01 DTR/TLH WHIPSTOCK & EMTPY GLV BP Exploration (Alaska) • • Page 1 of 1 Saltmarsh, Arthur C (DOA) From: Hubble, Terrie L [Terrie.Hubble@bp.com] Sent: Thursday, February 11, 2010 3:05 PM To: Saltmarsh, Arthur C (DOA) Subject: RE: PTD for PBU 15-16B Yup... you are correct, I have made a typo. The second lease number listed on the Permit to Drill should be 028303. Sorry 'bout that. Terrie From: Saltmarsh, Arthur C (DOA) [mailto:art.saltmarsh@alaska.gov] Sent: Thursday, February 11, 2010 2:02 PM To: Hubble, Terrie L Subject: PTD for PBU 15-16B Hi Terrie, Would you please check your lease numbers and your Section numbers. I need to know which lease the well TD's in. Neither of the leases you listed have Section 10 in them. Thanks. Art Art Saltmarsh, CPG Senior Petroleum Geologist Ak. Oil and Gas Conservation Commission 333 W. 7 Avenue Anchorage, Alaska 99501 907-793-1230 2/16/2010 Alaska Department of Natural sources Land Administration System • Page 1 of /( Alaska Mapper Land Records /Status Plats Recorder's Search State Cabins Natural Resources Alaska DNR Case Summary File Type: ADL File Number: 28303 Printable Case File Summary See Township, Range, Section and Acreage? New search .) Yes ij No LAS Menu 'Case Abstract 1 Case Detail 1 Land Abstract File: ADL 28303 s'ial Search for Status Plat Updates As of 02/16/2010 Customer: 000107377 BP EXPLORATION (ALASKA) INC PO BOX 196612/900 E. BENSON BL ATTN: LAND MANAGER - ALASKA ANCHORAGE AK 995196612 Case Type: 784 OIL & GAS LEASE COMP DNR Unit: 780 OIL AND GAS File Location: DOG DIV OIL AND GAS Case Status: 35 ISSUED Status Date: 09/14/1965 Total Acres: 2560.000 Date Initiated: 05/28/1965 Office of Primary Responsibility: DOG DIV OIL AND GAS Last Transaction Date: 12/04/2006 Case Subtype: NS NORTH SLOPE Last Transaction: AA -NRB ASSIGNMENT APPROVED Meridian: U Township: O11N Range: 014E Section: 03 Section Acres: 640 Search Plats Meridian: U Township: 011N Range: 014E Section: 04 Section Acres: 640 Meridian: U Township: O11N Range: 014E Section: 09 Section Acres: 640 Meridian: U Township: O11N Range: 014E Section: 10 Section Acres: 640 Legal Description 05 -28 -1965 * ** SALE NOTICE LEGAL DESCRIPTION * ** C14-124 11 N 14E UM 3, 4, 9,10 2560.00 U- 3- 7 End of Case Summary Last updated on 02/16/2010. http: / /dnr.alaska.gov /projects /las /Case Summary.cfm ?FileType= ADL &FileNumber = 2830... 2/16/2010 Alaska Department of Naturalosources Land Administration System • Page 1 of/ 1 Alaska Mapper Land Records /Status Plats Recorder's Search State Cabins Natural Resources Alaska DNR Case Summary File Type: ADL File Number: 28306 +Printable Case File Summary See Township, Range, Section and Acreage? New Search Yes C) No LAS Menu 1 Case Abstract 1 Case Detail 1 Land Abstract File: ADL 28306 M aP Search for Status Plat Updates As of 02/11/2010 Customer: 000107377 BP EXPLORATION (ALASKA) INC PO BOX 196612/900 E. BENSON BL ATTN: LAND MANAGER - ALASKA ANCHORAGE AK 995196612 Case Type: 784 OIL & GAS LEASE COMP DNR Unit: 780 OIL AND GAS File Location: DOG DIV OIL AND GAS Case Status: 35 ISSUED Status Date: 09/14/1965 Total Acres: 2560.000 Date Initiated: 05/28/1965 Office of Primary Responsibility: DOG DIV OIL AND GAS Last Transaction Date: 12/04/2006 Case Subtype: NS NORTH SLOPE Last Transaction: AA -NRB ASSIGNMENT APPROVED Meridian: U Township: 011N Range: 014E Section: 15 Section Acres: 640 Search Plats Meridian: U Township: O11N Range: 014E Section: 16 Section Acres: 640 Meridian: U Township: 011N Range: 014E Section: 21 Section Acres: 640 Meridian: U Township: 011N Range: 014E Section: 22 Section Acres: 640 Legal Description 05 -28 -1965 ** *SALE NOTICE LEGAL DESCRIPTION * ** C14-127 11N 14E UM 15,16,21,22 2560.00 U- 3- 7 End of Case Summary Last updated on 02/1112010. http: / /dnr.alaska.gov/ projects /las /Case_Summary.cfm ?FileType= ADL &FileNumber = 2830... 2/11/2010 1 • TRANSMITTAL LETTER CHECKLIST WELL NAME /�2 45 PTD# o? /Oac Development/ Service Exploratory Stratigraphic Test Non - Conventional Well FIELD: f:.€l/�4/..PE . �� ' POOL: /,e'uO, .3■01' 0/4 Circle Appropriate Letter / Paragraphs to be Included in Transmittal Letter CHECK ADD -ONS WHAT (OPTIONS) TEXT FOR APPROVAL LETTER APPLIES MULTI LATERAL The permit is for a new wellbore segment of existing well , Permit No. , (If last two digits in API No. . Production / injection should API number are continue to be reported as a function of the original API number between 60 -69) stated above. PILOT HOLE In accordance with 20 AAC 25.005(0, all records, data and logs / acquired for the pilot hole must be clearly differentiated in both �/ well name ( Pd'L/ /J- /G%3' PH) and API number (50- 4.?9- _2 / //S -7 ) from records, data and logs acquired for well pj°St( is-1408 SPACING The permit is approved subject to full compliance with 20 AAC EXCEPTION 25.055. Approval to perforate and produce / inject is contingent upon issuance of a conservation order approving a spacing exception. assumes the liability of any protest to the spacing exception that may occur. DRY DITCH All dry ditch sample sets submitted to the Commission must be in SAMPLE no greater than 30' sample intervals from below the permafrost or from where samples are first caught and 10' sample intervals through target zones. Should conventional core be acquired in this well, representative chip samples from each foot of core must be submitted to the Commission in accordance with 20 AAC 25.071. Non - Conventional Please note the following special condition of this permit: Well production or production testing of coal bed methane is not allowed for (name of well) until after (Company Name) has designed and implemented a water well testing program to provide baseline data on water quality and quantity. (Company Name) must contact the Commission to obtain advance approval of such water well testing program. Rev: 2/1/2010 .„ ' r fits ,;: Field & Pool PRUDHOE BAY, PRUDHOE OIL - 640150 Well Name: PRUDHOE BAY UNIT 15 -16B Program DEV Well bore seg PTD #:2100200 Company BP EXPLORATION (ALASKA) INC Initial Class /Type DEV / PEND GeoArea 890 __ __ _ - - Unit 11650 On /Off Shore On Annular Disposal ❑ Administration 11 Permit fee attached NA 2 Lease number appropriate Yes 3 Unique well name and number Yes 4 Well located in a defined pool Yes 5 Well located proper distance from drilling unit boundary Yes 6 Well located proper distance from other wells Yes 7 Sufficient acreage available in drilling unit Yes 8 If deviated, is wellbore plat included Yes 9 Operator only affected party Yes 10 Operator has appropriate bond in force Yes Blanket Bond # 6194193 11 Permit can be issued without conservation order Yes Appr Date 1 12 Permit can be issued without administrative approval Yes ACS 2/11/2010 1 13 Can permit be approved before 15 -day wait Yes 1 14 Well located within area and strata authorized by Injection Order # (put IO# in comments) (For NA 15 All wells within 1/4 mile area of review identified (For service well only) NA 1 16 Pre - produced injector: duration of pre production less than 3 months (For service well only) NA 17 Nonconven. gas conforms to AS31.05.030(j.1.A),(j.2.A -D) NA 1 18 Conductor string provided NA Conductor set in 15 -16A Engineering 19 Surface casing protects all known USDWs NA Surface casing set in 15 -16A 120 CMT vol adequate to circulate on conductor & surf csg NA surface casing cemented 21 CMT vol adequate to tie -in long string to surf csg NA Production casing set in 15 -16A 22 CMT will cover all known productive horizons Yes 4.5 liner to be cemented and perfed via TCP 23 Casing designs adequate for C, T, B & permafrost Yes 24 Adequate tankage or reserve pit Yes Rig equipped with steel pits. All waste to approved disposal wells. 25 If a re- drill, has a 10 -403 for abandonment been approved Yes 310 -038 26 Adequate wellbore separation proposed Yes Proximity analysis performed. Major risk with 15 -36B. Will be shutin during drilling. 27 If diverter required, does it meet regulations NA Wellhead in place . Appr Date 28 Drilling fluid program schematic & equip list adequate Yes Max fm press= 4170 psi ( 10.12ppg ...intermediate section) Will drill with 10.3 ppg mud GLS 2/18/2010 29 BOPEs, do they meet regulation Yes ( production zone at 3200 psi (7.08 ppg) will drill with 8.0 ppg mud ) 30 BOPE press rating appropriate; test to (put psig in comments) Yes MASP = 3377 psi Will test BOP to 3500 psi • 31 Choke manifold complies w /API RP -53 (May 84) Yes 32 Work will occur without operation shutdown Yes 33 Is presence of H2S gas probable Yes H2S reported on DS15 . Rig has sensors and alarms. 34 Mechanical condition of wells within AOR verified (For service well only) NA 35 Permit can be issued w/o hydrogen sulfide measures No Max level H2S for Pad was 40ppm on well 15 -20C (7/1/06). Geology 36 Data presented on potential overpressure zones NA Appr Date 37 Seismic analysis of shallow gas zones NA ACS 2/11/2010 38 Seabed condition survey (if off - shore) NA 39 Contact name /phone for weekly progress reports [exploratory only] NA Geologic Engineering P •lic Date: Date Date Commissioner: C ner. •.4.1,,,ner