Department of Commerce, Community, and Economic Development
Alaska Oil and Gas Conservation
Commission
HOME
EVENTS
DATA
Data List
Drilling
Production
Orders
Data Miner
Document Search
REPORTS
Reports and Charts
Pool Statistics
FORMS
LINKS
Links
Test Notification
Data Requests
Regulations
Industry Guidance Bulletins
How to Apply
ABOUT US
History
Staff
HELP
Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
211-026
New Plugback Esets 7/15/2024 Well Name API Number PTD Number ESet Number Date CRU C1-07 PB2 50-103-20478-71-00 203-225 T39188 1-29-2007 CRU CD2-467 PB1 50-103-20579-70-00 208-114 T39189 10-31-2008 CRU CD4-12 PB1 50-103-20414-70-00 210-091 T39190 9-20-2010 CRU CD4-210A PB1 50-103-20533-70-00 211-072 T39191 9-9-2011 KRU 1B-15AL3 PB1 50-029-22465-72-00 207-067 T39192 11-23-2009 KRU 1E-12L1 PB1 50-029-20736-70-00 210-004 T39193 5-24-2010 KRU 1E-12L2-01 PB1 50-029-20736-72-00 210-007 T39194 5-24-2010 KRU 3H-12A PB1 50-103-20088-70-00 211-081 T39195 9-9-2012 KRU 3I-11AL2 PB1 50-029-21932-70-00 210-076 T39196 11-1-2010 ODSK-33 PB1 50-703-20562-70-00 207-183 T39197 6-20-2008 OI11-01 50-029-23430-70-00 210-106 T39198 11-2-2010 OP04-07 PB1 50-029-23409-70-00 208-199 T39200 7-6-2010 OP08-04 PB1 50-029-23424-70-00 210-041 T39201 7-28-2010 PBU 06-02A PB1 50-029-20282-70-00 211-026 T39202 7-25-2011 PBU 15-05B PB1 50-029-20731-71-00 211-057 T39203 8-20-2011 PBU 15-16B PB1 50-029-21115-70-00 210-020 T39204 7-8-2010 PBU 18-04B PB1 50-029-20875-70-00 201-090 T39205 12-6-2002 PBU J-16B PB1 50-029-20967-70-00 212-014 T39206 9-28-2012 PBU K-05D PB1 50-029-21418-71-00 211-077 T39207 1-20-2012 PBU V-204L1 50-029-23217-60-00 204-132 T39208 11-13-2006 PBU W-19B PB1 50-029-22006-72-00 210-065 T39209 1-13-2011 PBU W-19BL1 PB1 50-029-22006-73-00 210-066 T39210 1-18-1011 SP23-N03 PB1 50-629-23456-70-00 211-127 T39211 3-5-2012 TBU M-10 PB1 50-733-20588-70-00 209-154 T39212 4-23-2010 PBU 06-02A PB1 50-029-20282-70-00 211-026 T39202 7-25-2011 Image Project Well History File Cover Page XHVZE This page identifies those items that were not scanned during the initial production scanning phase. They are available in the original file, may be scanned during a special rescan activity or are viewable by direct inspection of the file. ,cL - Oaf Well History File Identifier IIIIIIIOrganizing (done) El Two-sided Hill11111 ❑ Rescan Needed 111111111 (III RES AN DIGITAL DATA OVERSIZED (Scannable) Color Items: ❑ Diskettes, No. ❑ Maps: Greyscale Items: Other, No/Type: Gp i1 M p. L Other Items Scannable by a Large Scanner/e935 ❑ Poor Quality Originals: OVERSIZED (Non-Scannable) ❑ Other: ❑ Logs of various kinds: NOTES: ❑ Other:: BY: Maria Date: WI XI I 4. /s/ Me 1 Project Proofing II 1111111! 11111 BY: Maria Date: WI a I I Li. /s/ (of Scanning Preparation ,- x 30 = I O + = TOTAL PAGES J 1 ount does not include cover sheet) BY: Maria Date: a., `i f ( /s/ eyi Production Scanning 1 11111111111 II III Stage 1 Page Count from Scanned File: ,gwd (Count does include cover heet) Page Count Matches Number in Scanning Pre aration: YES NO BY: � Date: f Ia._ 14. /s/ (Vj F 1 Stage 1 If NO in stage 1, page(s) discrepancies were found: YES NO BY: Maria Date: /s/ Scanning is complete at this point unless rescanning is required. II 1111111111111111 ReScanned 111'1111111 11111 BY: Maria Date: /s/ Comments about this file: Quality Checked 1111111111 111111 o Q I'� .� Z Z E c J a J J0 N ' 6 Z Z. m To'CL > E •E m °� > E > E No z Z a aN al .1-n-wo d'N ' ' w = 0 a y'ur� m awa) to Z � _ g � y � 9.c)o) U Ai 5 5�� > }�l C 0 0p c d riga) .a� 0 • • a WOO ac (y (o mo 0cca 3cm a) oo a) E as E I a>-) °a r OJ a °a 2.2CC Q 47.`� 0 J m - 'EL m � rnco (aE - E 0)- CI)) E Emrnm o C oZ Za O 2. mN Q aE Qam Q ° Ea aa E E Z o U mm coU UN Q_I p a) mHo m p Q a) > o m pons 0 a a I" 22aa aO 2 2 C I-aO 2aO 22a I , iz O• 0 > a o 0 0 0 0 0 0 0 0 0 0 0 0 0 . U W U N N N N N N N N N N N N N N O Q a) a)'(D CO CO (O LO LO O M O M O M O O O O coO Q r N N M M co co -J E Q 2 --- c c c c a) a) c c c c c c c c Y c = _ o a a a c m a) a)a n o c a a �a Q CO Y Ot� ,O O O O D U 0 0 0 O O 0 0 0 -J N Li < I o 0 0 0 (0 0 0 0 co 0 0 0 O G U) U) (f) N N U) CO co CO CO v /� Z 'I a) a+'� r r r NI- r Tr ✓ 01co 4 O) To 0 Z m m o (n c t' co U) 0 co r_V V 0 0 0 0 0 0 0 ,n LiIv_ 0 0 d a) O O 0 0 a) m On) O^) co 0)) cor ) 0)) O Ali W W J V a m — O Z Q 6.6. u) WZ N J a15. .a O U o 0)9 ? o ) 0 0 0 0 ) 0 CL N c ZI J m U 0 0 U U 0 0 0 C r G Orny O 'ail o d a)A (n co (n U) (n ' 1 N E c J (n N N N (O (n N Lf) a) t0 `/ CO N "I a N J Q (9 OV I" o 2 Z J 0 CO ›.- N U W CO to C9 O a ) co- Cl) oV) CL S m W o Q Q a 0 01 Ice Q CZ dO Zp N N N N w> > .> w> ' Q dU aO ZZZZ i. i• i ...... . t ' � � c' (n (1) (1) ai ai ai '.'.. co ci) Z 0 a' C a' CC CO To m m m • c cc c c CC a) dl0 0 0 o c c m o o m m o o co N E E '� .0 .0 '� o o E •. .0 E E .0 E v m > > = > o Z ' a) E -o -o m m -0 v E Q - _ m m 0) lc c c c co p p p O Z Z 0 — — O O — — O I WQ IZId ! ) " NaC) N - OiA7 • co O i tCd a ZW O Z • 2 O OpN Q: Q 1- roC E .+ 1 0 F. 0 Z 2 o € € w H (0 co d w .ri Q Q J w 2 ty \ '‘.4 E 5 a w J y p W Q c y 0 (2 a p a p a o a a o 0 0 0 0 o a a 2 r4 O H 3 J Q FT W W O' J W J J J J J J J J 08 9 R z v n ' � -° CO 01aIca 0 O 0 Z p � ea o 5 A d I tn O Jul co I SI. Z 2 N EI: O.-a Q JO. ^/, E J N o o co II Z � I p, 4 C E ui N co IG E 'I to V I' 0 IX a o o ` O d) w Z Z U CL T E UJ g y� z cc 0 a rn v LUw 13 O J a, ✓ m Oy Z d Ce a Q 2 o= s ,. CO a y c J a ra = toOm CNI c0 c TE 3 co O ti I O 1 O N p oo E VN U 00 Q m I'm ZN I i • N a co °� mm tr) I �/m O a, II, III V) p f0 co D o Q a "a Q o a _ G Z > I'D U in E ai Z cc a> o a)• c 'a 1 Z O it r d N a a)E E u.Z -o ai ` o In m m J > re O `n W Z Q c.. 6 0 o Oji Z c c O °� rn '� - U U F= 0 T> I E a F. Q 0 — a W M w 3 °a 3 U CO) 11 o 10 RECEIVED STATE OF ALASKA JAN 3 1 2013 ALASKA OIL AND GAS CONSERVATION COMMISSION /�O��C WELL COMPLETION OR RECOMPLETION REPORT AND LOG la. Well Status: 0 Oil 0 Gas 0 SPLUG ❑Other• ®Abandoned ❑Suspended lb. Well Class 20AAC25.105 20AAC25.110 0 Exploratory 0 Stratigraphic 0 GINJ ❑WINJ 0 WAG 0 WDSPL 0 Other No.of Completions Zero '®Development 0 Service 2. Operator Name: 5.Date Comp.,Susp.,or Aband.: 12. Permit to Drill Number: BP Exploration(Alaska) Inc. 1/7/2013 211-026 • 3. Address: 6.Date Spudded: 13. API Number: P.O. Box 196612,Anchorage,Alaska 99519-6612 4/16/2011 50-029-20282-01-00 . 4a. Location of Well(Governmental Section): 7.Date T.D.Reached: 14. Well Name and Number: Surface: 5/2/2011 PBU 06-02A • 607' FSL, 1164' FEL, SEC 02,T1ON, R14E, UM 8. KB(ft above MSL): 64' 15. Field/Pool(s) Top of Productive Horizon: 961'FNL, 1719'FWL, SEC 02,T1ON, R14E, UM GL(ft above MSL): Prudhoe Bay Field/Prudhoe Bay Total Depth: 9.Plug Back Depth(MD+TVD) Oil Pool • 987'FNL,937'FWL,SEC 02,T1ON, R14E, UM 10380' 8888' 4b. Location of Well(State Base Plane Coordinates,NAD: 10.Total Depth(MD+TVD) 16. Property Designation: Surface: x- 685818 • y- 5941201 • Zone- ASP4 • 11450' 9042' • ADL 028311 TPI: x- 683327 y- 5944854 Zone- ASP4 11.SSSV Depth(MD+TVD) 17. Land Use Permit: Total Depth:x- 682546 Y- 5944808 Zone- ASP4 None 18. Directional Surve 19.Water depth,if offshore: 20. Thickness of Permafrost(TVD): Y ❑Yes ®No N/A ft MSL 1900'(Approx.) (Submit electronic and printed information per 20 AAC 25.050) ( PP ) 21.Logs Obtained (List all logs here and submit electronic and printed information per 20 AAC 25.071): 22.Re-Drill/Lateral Top Window MD/TVD: MWD DIR, GR, RES, GR/CCL/MCNL 10054' 8634' 23. CASING,LINER AND CEMENTING RECORD SETTING DEPTH MD SETTING DEPTH ND HOLE AMOUNT CASING WT. PER FT. GRADE TOP BOTTOM TOP BOTTOM SIZE CEMENTING RECORD PULLED 20" 94# H-40 Surface 118' Surface 118' 32" 269 sx Permafrost 13-3/8" 72# N-80 Surface 2695' Surface 2695' 17-1/2" 7200 sx Arcticset II 9-5/8" 47# N-80/RS95 Surface 10054' Surface 8634' 12-1/4" 1200 sx Class'G' 7" 26# L-80 Surface 9593' Surface 8263' Inside Pipe 835 sx Class'G' 3-1/2"x 3-3/16" 9.3#/6.2# L-80 9691' 11450' 8343' 9042' 4-1/4" 145 sx Class'G' 12' x 2-7/8" /6.4# 24. Open to production or injection? ❑Yes ®No 25. TUBING RECORD If Yes,list each interval open SIZE DEPTH SET(MD) PACKER SET(MD/ND (MD+TVD of Top&Bottom;Perforation Size and Number): ) 4-1/2", 12.6#, 13Cr80 9800' 9487'/8177' • 26. ACID,FRACTURE,CEMENT SQUEEZE,ETC. WAS HYDRAULIC FRACTURING USED DURING COMPLETION?❑Yes ®No DEPTH INTERVAL(MD) AMOUNT AND KIND OF MATERIAL USED 10380' Set Whipstock • 27. PRODUCTION TEST Date First Production Method of Operation(Flowing,Gas Lift,etc Not on Production N/A Date of Test Hours Tested Production For OIL-BBL: GAS-MCF: WATER-BBL: CHOKE SIZE: GAS-OIL RATIO: Test Period Flow Tubing Casing Press: Calculated OIL-BBL: GAS-MCF: WATER-BBL: OIL GRAVITY-API(CORR): Press. 24-Hour Rate 28. CORE DATA Conventional Core(s)Acquired? 0 Yes ®No • Sidewall Core(s)Acquired? ❑Yes ®No . If Yes to either question,list formations and intervals cored(MD+TVD of top and bottom of each),and summarize lithology and presence of oil,gas or water (submit separate sheets with this form, if needed). Submit detailed descriptions,core chips,photographs and laboratory analytical results per 20 AAC 250.071. None 'HER' Mt. FEB 0110llphL Form 10-407 Revised 10/2012 CONTINUED ON REVERSE VLF 4 3 �r C<�'Submit Original Only 2/1 l ?�.,.4 07 29. GEOLOGIC MARKERS(List all formations ar rkers encounter 30. FORMATION TESTS NAME MD TVD Well Tested? 0 Yes ®No Permafrost Top If yes,list intervals and formations tested,briefly summarizing test Permafrost Base results. Attach separate sheets to this form,if needed,and submit detailed test information per 20 AAC 25.071. Top CGL 10250' 8794' None Base CGL 10360' 8875' 23SB/Zone 2B 10442' 8925' 22TS 10560' 8986' 21 TS/Zone 2A 10690' 9037' Formation at Total Depth: 31.List of Attachment: Summary of Daily Drilling Reports,Well Schematic Diagram,Surveys 32. I hereby certify that the foregoing is true and correct to the best of my knowledge. Contact: • Jakabosky,564-4868 Email: Troy.Jakabosky@bp.com Printed Name: Title: Drilling Technologist i•stufk Signature: --� Phone 564-4091 Date: 1/5) INSTRUCTIONS General: This form is designed for submitting a complete and correct well completion report and log on all types of lands and leases in Alaska. Submit a well schematic diagram with each 10-407 well completion report and 10-404 well sundry report when the downhole well design is changed. Item 1 a: Classification of Service Wells: Gas Injection,Water Injection,Water-Alternating-Gas Injection,Salt Water Disposal,Water Supply for Injection, Observation,or Other. Multiple completion is defined as a well producing from more than one pool with production from each pool completely segregated. Each segregated pool is a completion. Item 4b: TPI(Top of Producing Interval). Item 8: The Kelly Bushing and Ground Level elevation in feet above mean sea level. Use same as reference for depth measurements given in other spaces on this form and in any attachments. Item 13: The API number reported to AOGCC must be 14 digits(ex: 50-029-20123-00-00). Item 20: Report true vertical thickness of permafrost in Box 20. Provide MD and TVD for the top and base of permafrost in Box 28. Item 23: Attached supplemental records for this well should show the details of any multiple stage cementing and the location of the cementing tool. Item 24: If this well is completed for separate production from more than one interval(multiple completion),so state in item 1,and in item 23 show the producing intervals for only the interval reported in item 26. (Submit a separate form for each additional interval to be separately produced, showing the data pertinent to such interval). Item 27: Method of Operation: Flowing,Gas Lift,Rod Pump, Hydraulic Pump,Submersible,Water Injection,Gas Injection,Shut-In,or Other(explain). Item 28: Provide a listing of intervals cored and the corresponding formations,and a brief description in this box. Submit detailed description and analytical laboratory information required by 20 AAC 25.071. Item 30: Provide a listing of intervals tested and the corresponding formation,and a brief summary in this box. Submit detailed test and analytical laboratory information required by 20 AAC 25.071. Form 10-407 Revised 10/2012 Submit Original Only 06-02A, Well History (Pre Rig Sidetrack) Date Summary 12/07/12 ***(PRE-CTD)). PULL KB LNR TOP PKR FROM DEP SLV @ 9679'ELMD(ELEMENT MISSING). RECOVERED MISSING ELEMENT W/BLB&2.62"WIRE GRAB. DRIFT WITH 22.5'OF 2.70 DUMMY WHIPSTOCK TO 10496'SLM. DRIFT WITH BAKER WHIPSTOCK DRIFT(2.62 OD)10500'SLM. 12/09/12 T/I/0=2350/0/235/120,Temp=S/I, Load&Kill, Freeze Protect Flowline(Pre E-line)Pumped 4 bbls meth spear,52 bbls crude,4 bbl meth tail to freeze protect F/L pressured up F/L to 1500 psi. Pumped 5 bbl meth spear,204 bbls 1%KCL ,38 bbls diesel for L&K/freeze protect Final WHP's vac/4/267 WV, SV=closed SSV,MV,IA,OA=open DSO norufied on departure. 12/10/12 T/I/O/OO=2480/Vav/240/90.Temp=SI.TBG FL.(E-Line call in).TBG FL @ 9670'(262'below sta#1, 170 bbl). SV&WV=C. MV&SSV=0. IA&OA=OTG. NOVP. 1700. 12/12/12 (ctd). DRIFT FREELY W/5'x 2.72"DRIFT&17'x 2.62"DUMMY WHIPSTOCK DRIFT TO 10476'SLM._ T/I/O 2400/0/241 Temp=SI Load tubing(pre-whipstick set)Pumped 5 bbl meth spear followed by 15 bbls of 1%KCL down tubing. 12/13/12 T/I/O 2400/0/241 Temp=Sl Load tubing(pre-whipstick set)Loaded tubing with 190 bbls of 130*f 1%KCL (total 205 bbls),38 bbls of diesel freeze protect.SV,WV,SSV=closed MV=open IA,OA,00A=otg FWHP 0/5/282. (ELINE WHIPSTOCK SETTING). INITIAL T/I/O=2350/300/200 PSI. RIGGED UP ELINE UNIT. LRS LOADED&KILLED TBG W/294 BBLS 2%KCL&40 BBLS DIESEL FREEZE PROTECT. --------- ------ CURRENTLY RIGGING UP ELINE TOOLS W/BAKER WHIPSTOCK. T/I/0=2300/0/300/160 temp=S/I Assist EL(CTD Prep)Pumped a total of 9 bbls meth and 4 bbls 110*2%KCL down TBG.rig down, LRS unit 62 on location to continue Job. FWHPS=2500/0/300/160. T/I/O 2330/0/250/140 Temp=SI Load well (pre E-line)Load tubing with 3 bbls meth,292 bbls 2%KCL. Freeze protect with 2 bbls meth,40 bbls 80*f diesel.SLB on well at departure. FWHP 0/0/250/140. 12/14/12 SET 3 3/16"BAKER PKR/WHIPSTOCK TOP @ 10380'(33.7 DEG LOHS)(TWO RA TAGS INSTALLED 5'FROM TOWS)(OAL=9.25'). CORRELATED TO SLB MEMORY COMPENSATED NEUTRON LOG DATED 4-MAY-2011 &. BKR GAMMA RAY MULTI PROPAGATION RESITIVITY LOG DATED 2-MAY- 2011. WELL LEFT SHUT IN-NOTIFIED PAD OP OF WELL STATUS LRS TO PERFORM MIT-T AT LATER DATE. FINAL T/I/O=1880/0/300/150 PSI. 12/15/12 T/I/O/OO= 1940NAC/250/100.Temp=SI.T FL(CTD prep). No AL.TBG FL @ 5909'(90 bbls). SV,WV, SSV=Closed. MV=Open. IA&OA=OTG. NOVP. 14:00. 12/16/12 T/I/O/OO= 1950NAC/240/80.Temp=SI. Bleed tubing to 0 psi.(CTD Prep). No AL.Tbg FL @ 6034'(92 bbls). Bled TP from 1950 psi to 1300 psi in 1 hour to 06-01 flowline. Pressure increased to 1850 psi during bleeding. Shut In bleed.Tubing pressure increased to 2300 psi when shut in and Tbg FL dropped 2902'to 8926'.Job Incomplete. Final WHP's=2300NAC/240/80. SV,WV=C.SSV, MV=0. IA,OA= OTG. NOVP. 1600 hrs. T/I/O/OOA=2240/0/205/54 MIT-T failed, lnjectivity on Tbg(CTD Prep)Pumped 5 bbls meth spear followed by 95 bbls diesel down Tbg in attempt to MIT-T.Tbg did not reach test pressure.Tbg injectivity 2000 psi-2030 psi @ 4.8 BPM. Page 1 of 3 06-02A, Well History (Pre Rig Sidetrack) Date Summary 12/17/12 MIT-IA**PASSED**to3000 psi,CMIT-OA x OOA**PASSED**to 1000 psi(CTD)Load and kill part job has been canceled til further notice as per FB PE. Pressured up iA to 3000 psi test pressure with 4.3 bbls diesel. Passed 1st test, 1st 15 min IA lost 9 psi,2nd 15 min IA lost 1 psi for a total of 10 psi in 30 min test. Bled la down to 2000 psi.(1 bbls)Pressured up OA x OOA with 10.3 bbls diesel. Passed 1st test, 1st 15 min OA lost 20 psi, OOA lost 18 psi,2nd 15 min OA lost 6 psi, OOA lost 9 psi for a total OA 26 psi, OOA 24 psi. Bled down OA x OOA psi's.(2.5 bbls)DSO notified of well status and tree valve positions as follows:SV,SSV,WV=closed. MV=open. IA and OA open to gauges. FWHP= 1180/0/180/180. T/I/O= 1150/180/180. Barriers=SV/SSV.Start barriers list. Conducted PJSM.Svc'd SV and SSV w. EV 960 prior to LTT. Performed LTT on SSV and SV independently for 5 min.(passed). Removed Tree cap bonnet assembly and installed 4"CIW ASV,with Tree cap bonnet assembly.Torqued flange to API specs(726 ft. lbs.5250 psi.). Pt'd ASV through tree cap to 300 psi.and 5000 psi. independently for 5 min.(passed)using SV as barrier.Charted and documented. SET 4-1/2"PX-PLUG BODY IN SVLN AT 2,108'SLM(2,121'MD) RAN 4-1/2"CHECK-SET TO PLUG BODY AT 2,108'SLM(2,121'MD)(good set) SET P-PRONG IN PX-PLUG BODY AT 2,104'SLM. PERFORMED SUCCESFUL DRAW DOWN TEST ON PLUG(gained 7#IN 30 min.) 12/19/12 T/I/O=800/58/53 Temp=S/I Load&Test(CTD)Loaded Tbg and attempted 1 test and repressured for 2nd test with 23.45 total diesel. 12/20/12 MIT-T**PASSED**to 2500 psi(CTD)Pumped 5 bbls dsl down tbg to reach test pressure.TBG dropped off rapidly to 934 psi in 10 mins.(See Log)Repressure tbg with .22 bbls of dsl. 15 min tbg lost 117 psi.30 min tbg lost 32 psi.Total loss of 149 psi in 30 mins. Bled back—1 bbl. Pumped 5 bbls neat methanol, followed by 43 bbls crude followed by 8 bbls of diesel down flowline to freeze protect. DSO notified of well status and tree valve positions as follows: Upper SSV=closed.SV,WV,SSV=closed. MV=open. IA,OA,OOA=open to gauges. FWHP=403/29/97/47. 12/22/12 T/I/O=450/200/0.Conduct PJSM. Barriers=SV and ASV.Start Barrier List.Verified by bleeding tubing pressure off ASV. Performed LTT for 5 min.(passed). Rigged up lubricator with 4"CIW'H'TWC#288. Pt'd lubricator to low of 200-300 psi.and high of 3500 psi.for 5 min.each(passed). Bled off tubing to 250 psi.and then set TWC tagging @ 140"using no ext. Bled off tree above TWC to verifiy integrity.Tested tree cap to 500 psi.(passed). Rigged down lubricator. 12/27/12 T/I/O/OOA=0/100/240/0. Conducted PJSM. Barriers= DH plug&TWC.Verified by bleeding TBG pressure off TWC(Passed)&MIT on DH plug(Passed). N/D ASV, N/D 4"CIW"FLS"tree. N/U new Calico(FMC 120&CIW"FLS")tree with Baker actuator.Torqued MV x TBH adapter to API spec(553 lb.ft,coated). Rigged up lubricator with CIW pulling tool to tree. Pressure tested lubricator against TWC, 200-300 psi low for 5 minutes(Passed),5000 psi high for 5 minutes(Passed),charted/documented in TRP folder..This satisfies lubricator and tree test, lubricator rated to 5000 psi.Tagged TWC#288 @ 123"w/out extensions, pulled through tree.Shut barriers(SSV&SV), bled SV to 0 psi through lubricator. Rigged down lubricator, installed tree cap,tested tree ccap to 500 psi(Passed). 12/30/12 (Post tree do, Pre CTD). PULLED P-PRONG&4-1/2"PX PLUG BODY FROM 2,105'SLM/2,121'MD. 01/02/13 T/I/O=SSV/0/200/100.Temp=SI.WHP's(Pre-CTD). SV,WV,SSV=C. MV=O. IA, OA,OOA=OTG. NOVP. 1400. Page 2 of 3 06-02A, Well History (Pre Rig Sidetrack) Date Summary 01/03/13 T/I/O/OO=SSVNac/220/110.Temp=SI. Bleed OAP&OOAP to 0 psi.(Pre-CTD).OA&OOA FL's=near surface. Bled OAP from 220 psi to 100 psi,fluid to surface, SI to build gas cap&bleed, repeat process for 3 1/2 hours, OAP now @ 50 psi.Bled OOAP from 110 psi to 55 psi in 3 minutes,fluid to surface,rig down&monitor for 30 minutes. No change in IAP, OAP increased 20 psi to 70 psi&OOAP increased 15 psi to 70 psi durint 20 minute4 monitor. Final WHP's=SSVNAC/70/70. SV,WV&SSV=C. MV=0. IA, OA&OOA=OTG. NOVP.0450. 01/04/13 T/I/0=1600/100/0; Conduct PJSM;Start Barriers List. Barriers=SV&SSV verified by bleeding both valves independently. LTT Passed: R/U lubricator to tree cap flange and test to 300 and 3500 psi for 5 min. LTT passed and charted;Set 4-1/16"CIW"H"TWC#279 thru tree for Nordic 2 Pre-CTD(New tree installed and tested by TRP)Bleed tree to 0 and monitor. LTT passed;S/I SV and R/D lubricator; Install tree cap, open SV and test against TWC to 300 and 3500 psi for 5 min. LTT passed and charted. 01/05/13 T/I/0/OO=SSVNAC/30/25.Temp=SI. Bleed OAP&OOAP to 0 psi.OA&OOA FL's=Near surface. Bled OAP&OOAP to 0 psi in 20 minutes(all gas), maintained open bleed for 3 1/2 hours,SI&monitor for end of shift. No change in IAP during bleed or monitor,OAP remained @ 0 psi&OOAP increased 3 psi during 30 minute monitor. Final WHP's=SSVNAC/0/3. 01/06/13 T/I/0=2050/0/0 Conduct PJSM w/rig personal;Start barrier list; Barriers=SV&SSV; Installed lubricator (night cap was off on arrival)&P.T.to 300 psi/3500 psi independently for 5 min.each(passed); Pulled 4" CIW"H"TWC#279 @ 135"w/3-5'ext., RKB=17.70'+2.00'riser; Post Nordic 2 BOPE test. Page 3 of 3 North America-ALASKA- BP Page 1 (MIL Operation t* — Operation Summary Report Common Well Name:06-02 AFE No Event Type: RE-ENTER-ONSHORE(RON) Start Date: 1/4/2013 End Date: X3-012FV-C: (2,464,021 00) Project:Prudhoe Bay Site:PB DS 06 Rig Name/No.: NORDIC 2 Spud Date/Time:5/1/1978 12:00:00AM Rig Release: Rig Contractor:NORDIC CALISTA UWI:500292028200 Active Datum:2:02 5/1/1978 00:00©64.00ft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (ft) 1/4/2013 20:00 - 22:00 2.00 MOB P PRE BEGIN RON EVENT WITH NORDIC 2 CTD RIG AT XXXX ON 01/04/13. HOLD PJSM WITH CREWS. VERIFY PRE MOVE CHECK LISTS ARE COMPLETE. BACK RIG OFF WELL P-17L1. SPOT RIG ON P "'PAD 22:00 - 00:00 2.00 MOB P PRE CLEAR RIG MATS FROM AROUND WELL. IAP =0 PSI,OAP=0 PSI. TP AND DRILLER COMPLETE ROUTE DRIVE. 1/5/2013 00:00 - 03:00 3.00 MOB P PRE MOVE RIG OFF OF P PAD, DOWN P PAD ACCESS ROAD,TO U PAD ACCESS ROAD. 03:00 - 06:00 3.00 MOB P PRE MOVE RIG TO N PAD,TO SPINE AND CC2A. 06:00 - 14:00 8.00 MOB P PRE CONTINUE MOVING ON SPINE ROAD TO DS-06. 14:00 - 16:00 2.00 MOB P PRE ARRIVE DS-06. SPOT RIG MATS AROUND WELL. 16:00 - 17:00 1.00 MOB P PRE MOVE OVER WELL.**ACCEPT RIG AT 16:00.** 17:00 - 19:30 2.50 RIGU P PRE SPOT SAT CAMP,PREP CELLAR AND OUTSIDE OF RIG 19:30 - 20:00 0.50 BOPS Ft P PRE LEAK TIGHT TEST OF SWAB.REMOVE TREE CAP 20:00 - 00:00 4.00 BOPSUR P PRE PJSM ND TREE CAP NU BOPE GREASE CHOKE AND KILL MANIFOLD. SLB MECHANICS CHANGE 2 PIECES OF HARDLINE IN INJECTOR HYDRAULIC SYSTEM AND TEST,CHANGE REEL MOTOR ON REEL PUMP IN POWER PACK. HARDLINE CREW SPOT FLOWBACK TANK AND RIG UP HARDLINE AND TEST. 1/6/2013 00:00 - 01:00 1.00 BOPSUR P PRE MU AND INSTALL LUBRICATOR RISER ON BOPE 01:00 - 02:30 1.50 BOPSUR P PRE PJSM,PICK UP GOOSENECK AND INJECTOR, STAND BACK INJECTOR 02:30 - 03:00 0.50 BOPSUR P PRE PJSM FOR BOPE TEST.MEASURE RKB.FILL STACK 03:00 - 04:00 1.00 BOPSUR P PRE PJSM.RAISE 2"REEL INTO REEL HOUSE. 04:00 - 04:30 0.50 BOPSUR P PRE SHELL TEST BOPE,GOOD TEST. 04:30 - 05:00 0.50 BOPSUR P PRE H2S RIG EVAC DRILL WITH AAR.ALL HANDS MUSTERED APPROPRIATELY. 05:00 - 09:00 4.00 BOPSUR P PRE PRESSURE TEST BOPE PUR ADWOP AND AOGCC REGULATIONS TO 250 PSI LOW A_ ND 3500PSI HIGH FOR FIVE MIN EACH.- PRESSURETESTANNULAR PREVENTER WITH 2"TEST JOINT-FUNCTION TEST KOOMEY ACCUMULATOR UNIT PER BP WELL CONTROL MANUAL AND NORDIC PROCEDURE.-TEST AND CALIBRATE GAS ALARMS.-FUNCTION ALL COMPONENTS FROM BOTH REMOTE STATIONS-TEST WITNESS IS WAIVED BY AOGCC INSPECTOR LOU GRIMALDI.-SEE ATTACHED DOCUMENTATION REPORT AND CHARTS. 09:00 - 10:00 1.00 BOPSUR P PRE TEST GAS ALARMS. Printed 1/21/2013 10.44.23AM • 4111r, North America -ALASKA- BP • Page Operation Summary Summary Report • Common Well Name: 06-02 AFE No Event Type: RE-ENTER-ONSHORE(RON) Start Date: 1/4/2013 End Date: X3-012FV-C: (2,464,021.00) Project: Prudhoe Bay Site:PB DS 06 Rig Name/No.: NORDIC 2 Spud Date/Time:5/1/1978 12:00:00AM Rig Release: Rig Contractor:NORDIC CALISTA UWI:500292028200 Active Datum:2:02 5/1/1978 00:00 @64.00ft(above Mean Sea Level) Date From-To I Hrs Task Code NPT NPT Depth Phase ! Description of Operations (hr) (ft) 10.00 - 10.30 050 BOPSUR N RREP PRE FINISH BOP TEST ALL ELEMENTS PASS EXCEPT UPPER 2"COMBIS.PURGE STACK TO CHANGE OUT 2"COMBI RAMS. 10:30 - 11:30 1.00 BOPSUR P PRE PJSM FOR PULLING CT ACROSS AND INTO INJECTOR.PULL CT ACROSS AND INTO INJECTOR.PUT INJECTOR BACK IN CIRC HOLE ON RIG FLOOR TO COMPLETE BOP TEST. 11:30 - 11:40 0.17 BOPSUR N RREP ` PRE PRESURE TEST UPPER 2"COMBIS,FAIL A SECOND TIME PREP TO OPEN BOP DOORS AGAIN. 11:40 - 14:00 2.33 BOPSUR P PRE CONDUCT RIG EVAC WITH DAY CREW.LIFT UP INJECTOR AND TEST WIRE,GOOD. PREP TO INSTALL CT CONNECTOR. 14:00 - 14:40 0.67 BOPSUR P PRE PULL TEST CONNECTOR TO 35KLBS,GOOD. INSTALL BHI CABLE HEAD. 14:40 - 15:40 1.00 BOPSUR N RREP PRE PUT INJECTOR BACK IN CIRC HOLE ON RIG FLOOR TO COMPLETE BOP TEST.GET A GOOD LOW AND HIGH PRESSURE TEST. 15:40 - 18:00 2.33 BOPSUR P PRE PREP TO FILL CT WITH MEOH THEN 1%KCL WATER.FILL CT WITH 5 BBLS MEOH FOLLOWED BY KCL WATER. 18:00 - 19:00 1 00 BOPSUR P PRE -BLOW BACK COIL FOR PULLING TWC AND BULLHEAD. STAND BACK INJECTOR FILL STACK 19:00 - 21:15 2.25 BOPSUR P PRE PJSM,PICK UP DSM LUBRICATOR AND EXTENSION RODS.INSTALL AND PRESSURE TEST LUBRICATOR TO 250/3500 PSI. 21:15 - 21:45 0.50 BOPSUR P PRE HOLD H2S/RIG EVAC DRILL WITH NEW CREW TO SLOPE.ALL MUSTERED APPROPRIATELY WITH AAR. 21:45 - 22:00 0.25 BOPSUR P PRE MOTOR ON HYDRAULIC PUMP OF SSV SYSTEM MALFUNCTION.SLB MECHANICS INSPECTED AND BACK ONLINE. 22:00 - 23:00 1.00 BOPSUR P PRE STING INTO TWC,2080 PSI BELOW.CLOSE SSV AND SWAB. BLEED OFF AND RD LUBRICATOR.RECOVER TWC. 23:00 - 00:00 1.00 BOPSUR P PRE FILL STACK WITH MEOH,INSTALL CTD RISER CAP AND PRESSURE TEST SAME. UNABLE TO TEST, NO LEAKS ON SURFACE.GREAE CREW GREASE SWAB AND SSV,FLUSH FLUID THROUGH STACK TO TIGER TANK AND FILL STANK ABOVE SWAB WITH MEOH. 1/7/2013 00:00 - 02:20 2.33 BOPSUR P PRE CONTINUE TROUBLESHOOTING TREE VALVES TEST RISER CAP AGAINST CLOSED SWAB AND SSV TO 350/3500 PSI.GOOD TEST. 02.20 - 05.00 2.67 KILLW P WEXIT PJSM,OPEN SWAB AND SSV,2060 PSI ON WELL. BULLHEAD 240 BBLS KCL AT 5 BPM AND 3500 PSI, DROP RATE DOWN SEQUENTIALLY TO 3 BPM TO KEEP BELOW 3500 PSI. PUMP 160 BBLS 8.6 PPG MUD AT 3500 PSI AND 3 BPM. 05:00 - 05:15 0.25 KILLW P WEXIT FLOW CHECK WELL,FLOW AND GAS ALARM IN PITS,SI WELL AT CHOKE. 05:15 - 07:00 1.75 KILLW P WEXIT CONTINUE BULLHEADING WITH MUD AT 3.25 BPM AND 3500 PSI. Printed 1/21/2013 10:44:23AM North America -ALASKA- BP • Page 3 - Operation Summary Report Common Well Name:06-02 AFE No Event Type: RE-ENTER-ONSHORE(RON) Start Date: 1/4/2013 End Date: X3-012FV-C: (2,464,021.00) Project: Prudhoe Bay Site: PB DS 06 Rig Name/No.: NORDIC 2 Spud Date/Time:5/1/1978 12:00:00AM Rig Release: Rig Contractor:NORDIC CALISTA UWI:500292028200 Active Datum:2:02 5/1/1978 00:00 @64.00ft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (ft) 07:00 - 09:00 2.00 KILLW P WEXIT SHUT DOWN AND ALLOW PRESSURE TO BLEED DOWN. MONITOR WELL. FLUID LEVEL SLOWLY FALLING IN STACK,LOSING ABOUT 1 BBUHR. 09:00 - 09:30 0.50 STWHIP P WEXIT MAKE UP BHA#1 -2.74"WINDOW MILL, STRING REAMER,2.12 MOTOR,2 JTS 2.06 CSH,2.375"COILTRAK.CONFIRM MILL IS 2.74 --GO,2.73 NO-GO.BHA OAL=110.76 FT. 09:30 - 11:30 2.00 STWHIP P WEXIT PRESSURE TEST QTS SUB.RIH, ROUTE RETURNS THROUGH MGS AS A PRECAUTION. 11:30 - 12:40 1.17 STWHIP P WEXIT START LOGGING GR FROM 10070 FT.TIE-IN TO SHUBLIK A AT 10,050'WITH(-35)' CORRECTION.TRIP SHEET IS-6 BBLS TO THIS POINT.DRY TAG WHIPSTOCK AT 10378 FT. 12:40 - 13:00 0.33 STWHIP P WEXIT GET SLOW PUMP PRESSURES WITH BOTH PUMPS.BRING UP PUMP TO 1.55 BPM/3200 iJ PSI FREE SPIN.START TIME MILLING FROM 10376.0 FT.SEE VERY SLIGHT AMOUNT OF GAS CUT MUD BACK FROM B/U BELOW LINER LAP.GO BACK TO NORMAL FLOW PATH AFTER RETURNS CLEAN UP. 13:00 - 13:30 0.50 STWHIP P WEXIT 10376.29 FT 3241 PSI OK DWOB. 13:30 - 14:20 0.83 STWHIP P WEXIT 10376.60 FT 3190 PSI 0.31K DWOB 14:20 - 15:10 0.83 STWHIP P WEXIT 10377.20 FT 3350 PSI 1.87K DWOB 15:10 - 16:00 0.83 STWHIP P WEXIT 10377.62 FT 3303 PSI 1.89K DWOB 16:00 - 18:00 2.00 STWHIP P WEXIT 10378.00 FT 3278 PSI 1.95K DWOB CONTINUE TIME MILL TO 10379.5 18:00 - 21:00 3.00 STWHIP P WEXIT TIME MILLING WINDOW AT 1 FPH AT 3250 PSI AND 1.5 BPM OF 8.57 PPG POWERPRO FROM 10,379.5'TO 10382.1'.FS 3250 PSI,DHWOB: 2.1-0.4 K LBS,9.9 PPG ECD,IAP UP TO 900 PSI BLEED TO 200 PSI. 21:00 - 21:45 0.75 STWHIP P WEXIT TIME MILL TO 10382.6',STRING REEMER EXIT CASING,TIME MILL 1ST FOOT OF FORMATION AT 1 FPH. PRELIMINARY TOW _ 10,376.4,BOW 10381.6'. 21:45 - 23:00 1.25 STWHIP P WEXIT DRILL FORMATION FROM 10384.6'TO 10392' _ AT 8 FPH,1.5 BPM AND 3370 PSI. 23:00 - 00:00 1.00 STWHIP P WEXIT BACK REEM WINDOW,THEN REEM UP AND DOWN 2 TIMES AT 1 FPM.PUMPING 1.5 BPM AT 3120 PSI. 1/8/2013 00:00 - 00:50 0.83 STWHIP P WEXIT REEM WINDOW ONE ADDITIONAL TIME, DRY DRIFT WITH NO WEIGHT DROP. 00:50 - 01:05 0.25 STWHIP P WEXIT FLOW CHECK FOR 10 MIN,NO FLOW. 01:05 - 02:45 1.67 STWHIP P WEXIT OPEN EDC,POH FROM 10,370'PUMPING 2.3 BPM AT 3450 PSI. AT 1800'2-WAY CHICKSAN ON REEL LINE STARTED LEAKING, BRING PUMP RATE • DOWN TO 1.25 BPM AND 1870 PSI,LEAK STOPPED. 02:45 - 03:15 0.50 STWHIP P WEXIT PJSM FOR LAYING DOWN MILLING BHA.TAG UP AT SURFACE,FLOW CHECK,NO FLOW. STAND BACK INJECTOR. Printed 1/21/2013 1:21:09PM North America -ALASKA- BP Operation Summary Report r, Common Well Name:06-02 AFE No Event Type: RE-ENTER-ONSHORE(RON) Start Date: 1/4/2013 1, End Date: X3-012FV-C: (2,464,021.00) Project: Prudhoe Bay Site:PB DS 06 Rig Name/No.: NORDIC 2 Spud Date/Time 5/1/1978 12:00:00AM Rig Release. Rig Contractor:NORDIC CALISTA UWI:500292028200 Active Datum:2:02 5/1/1978 00:00 @64.00ft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase I Description of Operations (hr) (ft) 03:15 - 04:00 0.75 STWHIP P WEXIT CIRC BHA TO WATER,LAY DOWN MWD TOOLS,2 JTS CSH,MILL AND STRING MILL GUAGED 2.72"GO/2.73"NO-GO. CHANGE OUT CHICKSAN ON REEL IRON, PRESSURE TEST AGAINST INNER REEL VALVE TO 4000 PSI,GOOD TEST. FLUSH MGS.CHECK TREE BOLTS,1 --REQUIRED TORQUE 04:00 - 04.30 0.50 DRILL P PROD1 MU BUILD DRILLING BHA WITH HCC 2.7"X 3.0" BIT AND 1.7 AKO MOTOR. GET ON WELL, PRESSURE TEST QTS TO 250/3500 PSI. 04:30 - 07:30 3.00 DRILL P PROD1 RIH WITH BUILD BHA 07:30 - 09:00 1.50 DRILL P PROD1 DRILL BUILD FROM 10390 FT. 09:00 - 10:00 1.00 DRILL P PROD1 CONTINUE DRILLING TO 10450 FT. PVT=393 BBLS. PICK UP HERE AND GET SPPS: PUMP#1 -1.01 BPM=2018 PSI,0.52 BPM= 1560 PSI PUMP#2-1.01 BPM=2010 PSI,0.52 BPM= 1556 PSI 10:00 - 13:05 3.08 DRILL P PROM CONTINUE DRILLING PAST 10480 FT. HOLD '60L TF FOR NOW TO BUILD ANGLE AND GET POINTED TOWARDS POLYGON. ROP IS 50-60 FT/HR WITH 0 7K DWOB. 1.57/1.56 BPM,8.58/8.62 PPG. PVT=391 BBLS. 13:05 - 13:15 0.17 DRILL P PROD1 DRILL TO 10600 FT. PULL BHA WIPER AFTER 150 FT DRILLED. CLEAN PASS UP AND DOWN. 13:15 - 14:30 1.25 DRILL P PROD1 CONTINUE DRILLING PAST 10605 FT. HOLD 30L TF TO BUILD ANGLE AND LAND BUILD SECTION. 1.60/1.59 BPM @ 2900 PSI FREE SPIN. 8.59/8.64 PPG. ROP IS 30 FT/HR WITH 1.1K DWOB. BLEED OFF OOA FROM 690 PSI TO 130 PSI. _DRILL TO END OF BUILD,10660 FT. 14:30 - 14:50 0.33 DRILL P PROD1 WIPER TRIP TO WINDOW. 14:50 - 14:55 0.08 DRILL P PROD1 PULL THROUGH WINDOW AND OPEN EDC. FLOW CHECK WELL. 14:55 - 16:40 1.75 DRILL P PROD1 FLOW CHECK IS GOOD. POOH,PUMP 2.3 BPM/3400 PSI. 16:40 - 17:00 0.33 DRILL P PROD1 FLOW CHECK WELL AT SURFACE,GOOD. OPEN CT RISER AND PULL REMAINING 50 FT TO SURFACE. 17:00 - 18:00 1.00 DRILL P PROD1 UD BHA#2, BIT IS 1-1 WITH 1 CHIPPED CUTTER, SOME RINGING ON THE NOSE. MAKE UP BHA#3, LATERAL ASSY WITH RESISTIVITY. 18:00 - 20:00 2.00 DRILL P PROD1 MAKE UP CT RISER AND PRESSURE TEST QTS CONNECTION, GOOD. RIH WITH BHA#3. 20:00 - 22:30 2.50 DRILL P PROD1 LOG FROM 10120'TO 10400'AT 150 FPM. PUMP MIN RATE AT 1350 PSI. TIE-IN IS(-37)'CORRECTION CONFIRM TOW IS 10377.5', BOW IS 10382.5' Printed 1/21/2013 10:44:23AM TREE 1 4"FMC 120 /� WELLHEAD= FMC 06-02A 6-0 2 A SA. NOTES: WELL ANGLE>70'@ 10710'. ACTUATOR= BAKER C **"4-1/2"CHROMETBC3' ** KB. ELEV= 64' BF.ELEV= 2 20"COND, H 100' ' - 2121' —14-1/2"HES X NIP,13=3.813" KOP= 3200' Max Angle= 105°@ 12037' 94#,H40, Datum ND= 10363' ID=19.124" >•c 2316' --I 9-5/8"FOC Datum TV D= 8800'SS 11 2441' —19-5/8"FOC 9-5/8"CSG,47#,SOFT RS-95 XO TO N-80 BUTT —{ 2295' (/ . 3150' EST TOP OF CEMENT(07/19/03 RWO)CSG,72#,J&L N-80 BUTT,ID=12.347" H 2695' •4 • GAS LIT MANDRELS 1 • ST MD TVD DEV TYPE VLV LATCH PORT DATE 4 • • 4 3529 3516 17 KBG-2 DMY BK 0 05/27/12 9-5/8"CSG,47#,14-80 XO TO SOFT RS-95 BUTT —{ 8216' t 3 6788 5992 41 KBG-2 DMY BK 0 05/27/12 4-1/2"TBG PUNCH(12116112) H 9101' -9106' • 2 8410 7295 36 KBG-2 DMY BK 0 07/19/03 0 • 1 9408 8113 35 KBG-2 DMY BK 0 07/19/03 • 4 • 9466' H Minimum ID = 2.377" @ 11114' 4 • 3-3/16" X 2-7/8" XO ! •• 4, s,4 9487' H7"X 4-1/2"BKRS-3 PKR,ID=3.875" • 7"TIEBK LNR 2611,L-80 BTC-M, H 9593' 4 • , : 9511' 14-1/2"HES XNIP, =3.813" .0383 bpf,ID=6.276" 4 • 9691' H3.70"BKR DEPLOY SLV,ID=3.00" • 3-1/2"LNR,9.3#,L-80 STL,.0087 bpf,H)=2.992" — 9744' 4 ► 9712' H 3-1/2"OTIS X NIP,ID=2.812" • 1l 09744' H3-1/2"X 3-3/16"XO,0=2.786" • 4 t4 9778' H4-1/2"HES XN NIP,MILLED TO 3.80(4/12/11) 4-1/2"TBG, 12.6#,13CR VAM ACE, — 9800' \ t• i1 .0152 bpf,ID=3.958" git ••••v 9800 ' —j4-1/2"WLEG,ID=3.958" BEHIND •••••t .•••••• 9899' -CASING HOLE 9898'-9929' LNR s+1 !i i• (RIG SQZ 01122/90) 9-5/8"CSG,47#,SOFT RS-95 —I 9977' — ♦• •••. XO TO SOFT N-80 BUTT ••• .•••; ••j w\� 1 7 s9 THE STATE Alaska Oil and Gas °fALASKA Conservation Commission GOVERNOR SEAN PARNELL wh 333 West Seventh Avenue �FALm p. Anchorage, Alaska 99501-3572 Main: 907.279.1433 Fax: 907.276.7542 John McMullen Engineering Team Leader BP Exploration (Alaska), Inc. P.O. Box 196612 Anchorage, AK 99519-6612 Re: Prudhoe Bay Field, Prudhoe Bay Oil Pool, PBU 06-02A Sundry Number: 312-355 Dear Mr. McMullen: Enclosed is the approved Application for Sundry Approval relating to the above referenced well. Please note the conditions of approval set out in the enclosed form. As provided in AS 31.05.080, within 20 days after written notice of this decision, or such further time as the Commission grants for good cause shown, a person affected by it may file with the Commission an application for reconsideration. A request for reconsideration is considered timely if it is received by 4:30 PM on the 23rd day following the date of this letter, or the next working day if the 23rd day falls on a holiday or weekend. Sincerely, S/1.64.- Cathy Foerster Chair DATED this 4,"f day of October, 2012. Encl. • STATE OF ALASKA ' `pig RECEIVED ALAKA OIL AND GAS CONSERVATION COMiv1ISSION• n T'S ,i /S//Z APPLICATION FOR SUNDRY APPROVAL SEP 1 3 2012 20 AAC 25.280 1. Type of Request: Aaska Ci & Gas Cons. Commtsspn ❑Abandon ®Plug for Redrill , 0 Perforate New Pool 0 Repair Well 0 Change Approved ProgA chorage ❑Suspend 0 Plug Perforations 0 Perforate 0 Pull Tubing 0 Time Extension ❑Operations Shutdown 0 Re-Enter Suspended Well 0 Stimulate 0 Alter Casing 0 Other 2. Operator Name: 4. Current Well Class: 5. Permit To Drill Number BP Exploration(Alaska) Inc. ®Development 0 Exploratory 211-026 3. Address: 0 Service 0 Stratigraphic 6. API Number: P.O. Box 196612,Anchorage,Alaska 99519-6612 50-029-20282-01-00 7. If perforating,closest approach in pool(s)opened by this operation to nearest 8. Well Name and Number: property line where ownership or landownership changes: Spacing Exception Required? ❑Yes ®No PBU 06-02A 9. Property Designation: 10.Field/Pool(s): ADL 028311 Prudhoe Bay Field/Prudhoe Bay Oil Pool 11. PRESENT WELL CONDITION SUMMARY Total Depth MD(ft): Total Depth TVD(ft): Effective Depth MD(ft): Effective Depth TVD(ft): Plugs(measured): Junk(measured): 11450' i 9042' ' 10630' 9020' 10630' None Casing Length Size MD TVD Burst Collapse Structural Conductor 118' 20" 118' 118' 1530 420 Surface 2695' 13-3/8" 2695' 2695' 4930 2670 Intermediate Production 10054' 9-5/8" 10054' 8634' 6870 4760 Liner Tie-Back Liner 9593' 7" Surface-9593' Surface-8263' 7240 5410 Liner 1771' 3-1/2"x 3-3/16"x 2-7/8" 9679'- 11450' 8333'-9042' Perforation Depth MD(ft): Perforation Depth TVD(ft): Tubing Size: Tubing Grade: Tubing MD(ft): 10582'- 11350' 8998'-9041' 4-1/2", 12.6# 13Cr80 9800' Packers and SSSV Type: 7"x 4-1/2"Baker'S3'packer Packers and SSSV 9487'/8177' MD(ft)and TVD(ft): 12. Attachments: 13.Well Class after proposed work: ®Description Summary of Proposal ®BOP Sketch 0 Detailed Operations Program 0 Exploratory Z Development 0 Service 0 Str 14. Estimated Date for 15. Well Status after proposed work: Commencing Operations: October 15,2012 0 Oil 0 WINJ 0 WDSPL 0 Plugged 16. Verbal Approval: Date: 0 Gas 0 GINJ 0 GSTOR 0 Abandoned Commission Representative: 0 WAG 0 SPLUG ®Suspended . 17. I hereby certify that the fore•oing is true and correct to the best of my knowledge. Contact Zach Sayers,564-5790 Printed Name John,Mullen Title Engineering Team Leader 1 Prepared By Name/Number. Signature Phone 564 4711 Date? 1/-32 Joe Lastufka,564-4091 7( Commission Use Only Conditions approval: otify Commission so that a representative may witness Sundry Number: 31.2.-,ss 0 Plug Integrity BOP Test 0 Mechanical Integrity Test 0 Location Clearance * 3 soy fs v $'aP 7e7; �— / l Other: Zv AC Z4/!Z. -rc.. (./ At- rtp/140 P/4-4-4ci, Subsequent Form Required: /6 ^tie 'Z ( , 24 APPROVED S /�� — S- /Z_ Y Approved By: 2- CO I • :� THE COMMISSION, Date ! C Form 10-403 Revised 01010 R u t K' l OCT 0 9 1 l / �Submit In Duplicate , 1\ To: Alaska Oil & Gas Conservation Commission From: Zach Sayers bp CTD Engineer Date: September 12, 2012 Re: 06-02A Sundry Approval Sundry approval is requested to plug the 06-02A perforations as part of drilling the 06- 02 coiled tubing sidetrack. History of 06-02. 06-02A is a CST completed in May 2011 with 500' of perfs in Zone 2A in the GDWFI area. The well was originally designed to have a lateral in Zone 2A and then toe up to a Zone 2B target. After having wellbore stability issues with the toe-up through the 22N shale, the well was openhole sidetracked and completed in only Zone 2A below the 22N shale. Initial production was lower than expected. Historically, wells drilled in this area clean-up in 3-4 months and draw in enough oil to flow competitive. However, this well did not show any improvement over several months. In April 2012, a plug was set over the existing open Zone 2A perfs and 10' of Zone 2B in the heel of the well were shot. Unfortunately, these perfs were too close to the parent well and were gassed out. 06-02A remains shut-in due to high GOR. Reason for sidetrack. 06-02A is not a competitive producer due to a high GOR, and there are no remaining wellwork options. The proposed sidetrack will access reserves in a —55 acre GDWFI target (Zone 2B1) in northwestern DS 06. Proposed plan for 06-02B is to drill a through tubing sidetrack with the SLB/Nordic 1 Coiled Tubing Drilling rig on or around November 15th, 2012. The existing perforations will be isolated by the primary cement job for the liner. The sidetrack, 06-02B, will exit the existing 3-3/16" liner, kick off in Z2, and land in Z2B. This sidetrack will be completed with a 2-3/8" liner in the production interval. The following describes the work planned and is submitted as an attachment to Form 10- 403. A schematic diagram of the proposed sidetrack is attached for reference. (o icer . This wCll /lever �ro�vc�c/ we r r qdd CA�►� Q� rr> /`4 41 f G0A and U/01er cv1", P�vfa� (�i�s rti�(( - C4� ' �' �rt/a(�er fMould tmf ov.c rcovve3 ;14 14j ?Yr;00 Df foo( • Pre-Rig Work: (scheduled to begin October 15th, 2012) 1. F MIT- IA to 3,000 psi, MIT-OA to 2,000 psi. 2. W Cycle LDS; PPPOT- T to 5,000 psi. 3. S Pull KB Liner Top Packer at 9,679' MD. 4. S Dummy WS drift to 10,500'MD (47° Inc). 5. F Load and kill well with 1% KCI. 6. E Set 3-3/16" Packer whipstock at —10,368' MD using CCL to locate mid joint. 7. F Test packer whipstock to 2,400 psi for 30 min MIT. 8. V PT MV, SV, WV. 9. 0 Bleed wellhead, production, flow, and GL lines down to zero and blind flange. Pitk 10. 0 Remove wellhouse, level pad. Rig Work: (scheduled to begin November 15th, 2012) MIRU and test BOPE to 250 psi low and 3,500 psi high. 2. Mill 2.80" window at 10,368 and 10' of rathole. Swap the well to PowerVis. 3. Drill Build: 3" OH, 250' (24.5°/100 planned). 4. Drill Lateral: 3" OH, 2,060' (12°/100 planned) with resistivity. I)µM) 5. Run 2-3/8" L-80 liner leaving TOL at 9,650' MD. 6. Pump primary cement leaving TOC at 9,650' MD (TOL), 11 bbls of 15.8 ppg cmt planned. rip 7. Cleanout liner and run RPM/GR/CCL log. 8. Test liner lap to 2,400 psi. 9. Perforate liner per asset instructions (-200'). 10. Freeze protect well, set BPV, RDMO. Post-Rig Work: 1. Re-install wellhouse, flowline and pull BPV. 2. Set 4-%" liner top packer, and test to 2,400 psi (If liner lap test fails). 3. Generic GLV's. 4. Test separator. Zach Sayers CTD Engineer 564-5790 CC: Well File Sondra Stewman /Joseph Lastufka 'TREE= FMC GEN 1 A WELLHEAD= FMC 06_0 2 A Sk >t NOTES: WELL ANGLE>70°@ 10710'. ACTUATOR= AXELSON ��++ 4 112"CHROME TBG KB ELEV= 64' j i BF ELEV 20"COND, -1 100' / 2121' -14-1/2"HES X MP,ID=3.813" KOP=__.._. . 3200' Max Angle= 105°@ 12037' 94#, 11-40, e" ID=19.124" Datum MD= 10363' II 2316' H9-5/8"FOC Datum ND= 8800'SS 2441' -19-5/8"FOC 9-5/8"CSG,47#,SOFT RS-95 XO TO N-80 BUTT H 2295' 13-3/8"CSG,72#,J&L N-80 BUTT,ID=12.347" H 2695' (4, / 3150' EST TOP OF CEMENT(07/19/03 MO) �/ / GAS LIFT MANDRELS 41 ST MD TVD DEV TYPE VLV LATCH PORT DATE .4' •, 4 3529 3516 17 KBG-2 Mit BK 0 05/27/12 9-5/8"CSG,47#,N-80 XO TO SOFT RS-95 BUTT H 8216' 7 t� 3 6788 5992 41 KBG-2 [NY BK 0 05/27/12 4� 2 8410 7295 36 KBG-2 DMY BK 0 07/19/03 $ /• 1 9408 8113 35 KBG-2 DMY BK 0 07/19/03 Minimum ID = 2.377" c 9679' 4 •j 9466' -14-1/7'HES X NIP,ID=3.813" KB LINER TOP PACKER �j i I •� Clovi 9487' -7"X 4-1/2"BKR S-3 PKR,ID=3.875" t/ 4/ 9511' -14-1/7'HES X NIP,ID=3.813" 7"TIEBK LNR,26#,L-80 BTC-M, -1 9593' 4 �/ .0383 bpf,ID=6.276" '/ 4� 4 �1 9679' ELM -1 KB LNR TOP PKR,ID=2.377" 9691' -13.70"BKR DEPLOY SLV,ID=3.00" r II C 9712' H3-1/2"OTIS X NIP,ID=2.817' 3.1/2"LNR,9.3#,L-80 STL, .0087 bpf,ID=2.992" 9744'- 0 ►' * 9744' H3-1/2"X 3-3/16"XO,ID=2.786" P9778' --14-1/7'HES XN NIP,KILLED TO 3.80(4/12/11) 4-1/2"TBG,12.6#,13CRVAMACE, --1 9800' 1 1 ti 0152 bpf,ID=3.958" ���% •.��, 9800' H4-1/2"WLEG,ID=3.958" BEHIND ••�•�• ••••••• 9899' CASING HOLE 9898'-9929' LNR ►••i i•♦ � s• 4V 'i4, � RIG SQZ 01/22/90) 444 9-5/8''CSG,47#,SOFT RS-95 -{ 9977' 1- "♦ ♦ • XO TO SOFT N-80 BUTT •i�i•i 'TRS= t FMC GEN 1 WELLHEAD= FMC 06-02A ***4-1/2"CHROMES: TBG*** ANGLE>70°@ 10710'. ACTUATOR= AXELSON KB.ELEV= 64' ) BF SEN 20"GOND, H 100' i// ' J 2121' H4-1/2"HES X NP,D=3.813" KOP= 3200' Max Angle= 105°@ 12037' 94# H-40, Datum MD= 10363' D=19.124" x 2316' H 9-5/8"FOC Datum ND= 8800'SS 2441 —19-5/8"FOC 9-5/8"CSG,47#,SOFT RS-95 XO TO N-80 BUTT H 2295' • 3150' H EST TOP OF COVENT(07/19/03 RWO) 13-3/8"CSG,72#,J&L N-80 BUTT,ID=12.347" H 2695' • • GAS LIFT MANDRELS • • ST MD TVD DEV TYPE VLV LATCH FORT DATE 9-5/8"CSG,47#,N-80 XO TO SOFT RS-95 BUTT H 8216' L) c 4 3529 3516 17 KBG-2 DMY BK 0 05/27/123 6788 5992 41 KBG-2 DMY BK 0 05/27/12 • • 2 8410 7295 36 KBG-2 DMY BK 0 07/19/03 • • 1 9408 8113 35 KBG-2 DMY BK 0 07/19/03 • Minimum ID =2.377" @ 9679' , , : 9466' —14-1/2"HES X NP,D=3.813" KB LINER TOP PACKER • -- • • 9487' H7"X 4-1/2"BKR S-3 PKR,D=3.875" k :• �t • 7"TIEBK LNR,26#,L-80 BTC-M, H 9593' 1 1 , • 9511' H4-1/2"HES X NIP,ID=3.813" • .0383 bpf,U=6.276" • TOL/TOC —9,650' MD 36° INC 3-1/2"LNR,9.3#,L-80 STL,.0087 bpf, D=2.992" H 9744' 4 ' 9691' —13.70'BKR DEPLOY SLV,ID=3.00" P 9712' H3-1/2"OTIS X NIP,ID=2.812" ' / 9744' H 3-1/2"X 3-3/16"XO,D=2.786" A' • • r - 9778' —14-1/2"HES XN NIP,WILL®TO 3.80(4/12/11) 4-1/2"TBG,12.6#,13CRVAMACE, — 9800' \ i• 1 0152 bpf,D=3.958" ♦�• I 9800' —i4-1/2"WLEG,D=3.958" BEHIND ••••• •• ••♦•♦• 9899' CASING HOLE 9898'-9929' LNR 9-5/8"CSG,47#,SOFT RS-95 —{ 9977' H 4•;*,. ' j•�•t. (RIG SQZ 01/22/90) XO TO SOFT N-80 BUTT ♦•♦•1 O•♦• •�•�• .•�•� MILLOUT WINDOW(06-02A) 10055'-10064' W ♦•♦ •♦ WHIPSTOCK(04/15/11) 10054' •0 • 9-5/8"CSG,47#,SOFT N-80 BUTT,D=8.681" —10064 •••• . ♦♦� TSGR 9,890' M D ♦•••♦ 2-3/8"4.7#, L-80 Liner ••• ••• TD- 12,7 6' MD PERFORATION SUWTIARY •••••4 ` no-LOG:SLB MCN../GR/CCL ON 05/04/11 A-•-•••4;*��_� ,- ANGLE AT TOP PERF:58°@ 10582' ♦• •• •Note:Refer to Production DB for historical pert data �:�.i ;:�. 47° 10630' H 3-1/2"CEP(04/04/12) SIZE SPF INTERVAL Opn/Sqz DATE ♦•••• ♦♦ Z2 KO , ♦•••• I 11114' H 3-3/16"X 2-7/8"XO,ID=2.377" 2" 6 10582-10592 0 04/02/12 •,•�. 1.4 /� 2" 6 10800-10950 0 05/05/11 • 2" 6 11000-11350 0 05/05/11 65555555551A3-3/16"LNR 6.2#,L-80 701,.0087 bpf,ID=2.80" 11114' PBTDH 11412' I 'MS. .r 2.7/8"LNR,6.4#,6.80 STL,.0058 bpf,U=2.441" H 11450' DATE REV BY COMMENTS DATE REV BY COMvENTS PRUDHOE BAY UNIT 10/30/78 NIES ORIGINAL COMPLETION 05/27/11 PJC DRLG DRAFT CORRECITONS WELL: 06-02A 01/30/90 AUDI 4 RWO 06/26/11 AK/PJC FINAL DRLG CORRECTIONS PERMIT No:'2110260 07/19/03 N4ES RWO 04/03/12 TTR/PJC ADPERFS(4/2/12) API No: 50-029-20282-01 06/11/05 JGM/PJC CTU 9 3-1/2"LNR 04/05/12 TTR/JWD SET CBP(04/04/12) SEC 2,T1 ON,R14E,607'FSL&1164'FEL 05/07/11 NORDIC CTD SIDETRACK(06-02A) 05/30/12 MSS/JMD GLV C/O(05/27/12) 05/25/11 PJC DRLG HO CORRECTIONS BP Exploration(Alaska) C " '1 -I N 17. s r 0. ', 1 C ob s 13 a 1 1U $ " A U1: r 1 101U m> -\ I ' 1 "= f� 1F _ A —No II k 1 1#''1 " 2 2 •'o a a` .11 F., I ! , I I °o s • U F. 2"U OQ :1m m=2 T 0 Q ��3 _ 4 0 - 0 1 Q m :: _ '° 0. O F U 11 8., ' o m 1 lit1 1my1 J I iii i iii OS g I J J 9 Z €u Q '0 ,,, ''' 1.11 jr. a I 3 $ -J °" Eo n� 0 II § o� " I . • 111 i CI t CI c U I s LLI ' Y >111 t W19 .i 19 ..1 ' III . • LLI 0) Y111111 I �� a a 1 mrm ,0 ' s Ce 2 L Cn J E� Q I wm ; TilCe viiiiiissiiiiisisits o" o' 1 1 u a ,_, 8' ) 1 ► mf b 111 .:swl/�i �: tiu I ® 1111 14 'o ♦ 1 ® 1 1 , gimilm_i 1 I] 9. 0Op\ :7 I .> 6 I SII a iiI ~ li 1� Z 1 11=111111 6 I v , . Page 1 of 1 Subject: FW: INTENT PLUG for RE-DRILL WELLS: Corrected From: Davies, Stephen F (DOA) Sent: Monday, February 08, 2010 10:52 AM To: Foerster, Catherine P (DOA); McMains, Stephen E (DOA); Schwartz, Guy L (DOA); Saltmarsh, Arthur C (DOA); Aubert, Winton G (DOA) Subject: RE: INTENT PLUG for RE-DRILL WELLS: Corrected Revised procedure with an additional step per Cathy's comment: INTENT PLUG for RE-DRILL WELLS (IPBRD)Type Work Code in RBDMS 1. When a Form 10-403 is submitted requesting approval to plug a well for redrill,the initial reviewer(Art / or Steve D.)will check to make sure that the "Plug for Redrill" box in the upper left corner of the 403 ✓ form is checked. If the "Abandon" box is checked,we will cross that erroneous entry out and initial it on both copies of the Form 10-403 (AOGCC's and operator's copies). 2. On the Form 10-403 if"Abandon" is checked in Box 15 (Well Status after proposed work), Art or Steve D. will cross that erroneous entry out and initial it on both copies of the Form 10-403 (AOGCC's and 1/ operator's copies). Instead, we will check the "Suspended" box. Guy and Winton will serve as quality control for steps 1 and 2. 3. When Steve McMains receives the Form 10-403 with a check in the "Plug for Redrill" box, he will enter the existing code "IBPRD" into RBDMS. This code automatically generates a comment under the History tab stating "Intent: Plug for Redrill." 4. When Steve McMains receives any Form 10-407, he will check the History tab in RBDMS for this comment. If he sees the "Intent: Plug for Redrill" code, and cannot find any evidence that a subsequent re-drill has been COMPLETED, he will assign a status of SUSPENDED to the well bore in RBDMS, no matter what status is listed on the 10-407. Steve will also change the status on the 10-407 form to SUSPENDED, and will date and initial his change. If Steve does not see the "Intent: Plug for Redrill" comment or code, he will enter the status listed on the Form 10-407 into RBDMS. 5. When the Form 10-407 for the redrill is received, Steve M. will change the original well's status from suspended to abandoned. 6. The first week of every January and July, Steve M. and Steve D. will check the "Well by Type Work Outstanding" user query in RBDMS to ensure that all of the Plug for Redrill wells have been handled properly. At this same time, Steve M. and Steve D. will also review the list of suspended wells for accuracy. Thanks, Steve D. file://F:\Daily_Document Record\Procedures_Instructions\FW INTENT PLUG for RE-DRI... 4/6/2012 RECEIVED STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMMISSION Ai-R 2 0 2012 REPORT OF SUNDRY WELL OPERATIONS AOGCC 1.Operations Abandon U Repair Well U Plug Perforations U Perforate U Other U Performed: Alter Casing ❑ Pull Tubing 0 Stimulate-Frac ❑ Waiver 0 Time Extension 0 Change Approved Program 0 Operat.Shutdown p Stimulate-Other ❑ Re-enter Suspended Well 0 2.Operator 4.Well Class Before Work: 5.Permit to Drill Number: Name: BP Exploration (Alaska) , Inc. Development X❑ Exploratory ❑ — 211-026 3.Address: P.O. Box 196612 Stratigraphic❑ Service ❑ 6.API Number: Anchorage, Alaska 99519-6612 50- 029-20282-01-00 7.Property Designation(Lease Number): . 8.Well Name and Number: — ADL-028311 Prudhoe Bay Field / Prudhoe Bay Oil Pool 9.Logs(List logs and submit electronic and printed data per 20AAC25.071): 10.Field/Pool(s): PBU 06-02A 11.Present Well Condition Summary: Total Depth measured 11450 feet Plugs measured 10630 feet true vertical 9042 feet Junk measured NONE feet Effective Depth measured 11412 feet Packer measured 9487, 9679 feet true vertical 9041 feet true vertical 8177, 8333 feet Casing Length Size MD TVD Burst Collapse Structural Conductor 80' 20" 94# H-40 38'-118' 38'-118' 1530 520 Surface 2658' 13-3/8" 72# N-80 37'-2695' 37'-2695' 4930 2670 Production 2259' 9-5/8" 47# RS-95 36'-2295' 36'-2295' Production 7759' 9-5/8" 47# N-80 2295'-8216' 2295'-7136' 6870 4760 Liner 9558' 7" TIEBK 26# L-80 35'-9593' 35'-8263' 7240 5410 Liner 53' 3-1/2" 9.3# L-80 9691'-9744' 8343'-8385' 10160 10530 Liner 13707298' 3-3/16"6.2#L-80;2-7/8"6.4# 9744'-11114' 8385'-9040' Perforation depth Measured depth SEE ATTACHED feet 11114'-11412' 9040'-9041' True Vertical depth feet Tubing(size,grade,measured and true vertical depth) 4-1/2" 12.6# 13CR80 9800' 8431' 4-1/2" BKR S-3 PKR 9487' 8177' Packers and SSSV(type,measured and true vertical depth) 2.377" KB LNR TOP PKR 9679' 8333' 12.Stimulation or cement squeeze summary: Intervals treated(measured): Treatment descriptions including volumes used and final pressure: 13. Representative Daily Average Production or Injection Data Oil-Bbl Gas-Mcf Water-Bbl Casing Pressure Tubing Pressure Prior to well operation: 210 15725 661 374 Subsequent to operation: 309 19277 4 301 14.Attachments: 15.Well Class after work: Copies of Logs and Surveys Run Exploratory Development❑X - Service ❑ Stratigraphic 0 Daily Report of Well Operations g 16.Well Status after work: ^ Oil ❑X Gas ❑ WDSPL❑ GSTOR 0 WINJ ❑ WAG ❑ GINJ ❑ SUSP❑ SPLUG 0 17.I hereby certify that the foregoing is true and correct to the best of my knowledge. Sundry Number or N/A if C.O.Exempt: Contact Printed Name Nita Summer ys Title Data Manager / O�i/�> i2..'- - Phone 564 4035 Date 04/17/2012 Signatur- .il„ off .Ti, ,_�'�/' RBDMS APR 2 0 201IiPirl'i L j.zO / Form 10-404 Revised 11/2011 y Submit Original Only y SOL • OD o00 o. CO' m• 0 0 0 •CCOCi0� 0) a 0 a N CO la GO O 1.46 0.0) 0) 03 0) W Z W 00 ooc�io O D dYY ommincOo W W W J 4 000 m 0 '- 0 0 Z W N Q MM :I000. ww 0. » NNoawaO0oy u � GGwwpppp mmd d WW oaQC1C� HF- z a cem W v) v) v) v) v) 2c-0eCNocci co 0 0 co Q ~ 0a- 00 o � Qom ■- � � � CD O N ~ C1 Q Lad WaaawU' CN00 0. E 0Wommv) v) v) v) m o a O j o 0 Lu 0. 0 0 O 0 la MI W wwF- F- • wo. a a� waa 0. 0. r- � NN ami-0NJ O ' ° (1)� � � N � LU Q44w O 0 a v W U U U J ma000 mm hd' aZ = = = z 0. p�pp0 -i -Jwwwa O < OmmiZiZNNLI0 m Z• N N N N 4999 pppwaa0 � ce0X y0000 mm � LL20 06-02A DESCRIPTION OF WORK COMPLETED NRWO OPERATIONS EVENT SUMMARY ACTIVITYDATE SUMMARY 3/30/2012 ***WELL S/I ON ARRIVAL*** ;DRIFTED WITH A 2.30" CENT. AND 1 1/2" SAMPLE BAILER. STOPPED @10,692' SLM DUE TO DEVIATION. (sample bailer was empty) DRIFTED WITH A 10'x 2" DUMMY GUN. STOPPED @10,665' SLM DUE TO DEVIATION. ****JOB STILL IN PROGRESS, WSR CONTINUED ON 3/31/2012**** 3/31/2012***WSR CONTINUED FROM 3/30/2012*** (profile modification) RIG DOWN SLICKLINE UNIT. ****LEFT WELL SHUT-IN AND SSV OPEN TO PANEL**** 4/1/2012;***WELL SHUT-IN UPON ARRIVAL*** (E-LINE: PERF AND SET PLUG) INITIAL T/I/O/OO = 1700/1800/400/0 PSI ;ARRIVE AT LOCATION AND BEGIN RIGGING UP AND SPOTTING 'EQUIPMENT. LPT PASSED AT 300 PSI AND HPT PASSED AT 3000 PSI. 'ARM GUN AND PREPARE TO RIH. FINAL T/I/O/OO = 1700/1800/400/0 PSI 1***JOB CONTINUED ON 2-APR-2012*** 4/2/2012 ***JOB CONTINUED FROM 1-APR-2012*** (E-LINE: PERF AND SET PLUG) INITIAL T/I/O = 1700/1800/400 PSI RIH WITH HEAD (5X3)/ ERS/2-WEIGHTS/ UPCT/ FIRING HEAD / 10' 2"-HSD POWERJET OMEGA. OAL = 36.45'/OAW = 330#/ MAX OD = 2.25". PERFORATE INTERVAL = 10582' - 10592'. CCL TO TOP SHOT = 3.25'. CCL !STOP DEPTH = 10578.75'. TIE-IN LOG USED (SLB MEMORY CNL 4-MAY-2011) POOH. HOLES VISIBLE IN THE GUN. LAY DOWN. COME BACK TOMORROW. ;FINAL T/I/O = 2000/1800/450 ***JOB CONTINUED ON 3-APR-2012*** 4/2/2012 TWO = SSV/2270/330/0+. Temp = SI. WHP's IA FL (eval high IAP). No AL. IA FL @ 6788' (Sta # 3 SO, 119 bbls). SV, WV, SSV = Closed. MV = Open. IA& OA= OTG. NOVP. 14:30 4/3/2012 T/I/O/OO = 2330/2310/340/0+. Temp = SI. TIFL- PASSED (Eval high IAP). No AL. IA FL @ 6675' (113' above Sta 3 SO, 117 bbls). Bled IAP to OT from 2310 psi to 1070 psi in 1 hr. During bleed TP decreased 40 psi, OAP decreased 20 psi & IA FL inflowed 328 ' to 6347' (441' above Sta 3 SO). Monitored for 1 hr, TP increased 150 psi, IAP increased 10 psi & IA FL inflowed 47' to 6300'. Job Complete. Final WHPs = 3340/1080/320/0+. SV, WV, SSV = C. MV = O. IA, OA= OTG. NOVP. 16:45 4/3/2012 ***JOB CONTINUED FROM 2-APR-2012***(E-LINE: PERF AND SET PLUG) INITIAL T/I/O = 2300/1100/400 ARRIVED AT LOCATION. BEGAN TO RIG UP. ARMED THE SETTING TOOL 'AND PLUG. LPT AT 300 PSI PASSED. HPT AT 3000 PSI PASSED. RIH WITH HEAD/ERS/2-WEIGHT BARS/ROLLERS/UPST/ROLLERS/ FIRING HEAD/HALLIBURTON SETTING TOOL AND PLUG. TOOL 1 DIMENSIONS: OAL =3T/OAW =350/MAX OD =2.28"/ FISHING NECK= 1.38". FINAL T/I/O = 2350/1100/400 ***JOB CONTINUED ON 4-APR-2012"** 4/3/2012T/I/O = SSV/2290/0+. Temp = SI. WHP's (call-in). No AL. IAP increased 20 psi overnight. SV,WV, SSV=Closed. MV= Open. IA& OA= OTG. NOVP. 09:20 4/4/2012 ***JOB CONTINUED FROM 3-APR-2012*** (E-LINE: PERF AND SET PLUG) INITIAL T/1/0 =2350/1100/400 SET PLUG. USE SCHLUMBERGER MEMORY CNL FROM 4-MAY-2011 FOR ,TIE-IN. PLUG SPECIFICATIONS: HALLIBURTON CIBP/OAL =2.01'/MAX OD =2.28". SET DEPTH INFORMATION: TOP OF PLUG = 10629'/ME SET DEPTH = 10630' ,/CCL TO ME = 10.65'/CCL STOP DEPTH = 10619.35'. (SWAB =C, SSV=C, MASTER=0,WING = C FINAL T/I/O =2350/1100/350 ' ***JOB COMPLETE.WELL SHUT-IN UPON DEPARTURE*** 4/4/2012 T/I/O/OO =2340/1110/320/0+. Temp = SI. WHP's (Post TIFL). No AL. IA FL unchanged @ 6300'. TP unchanged, IAP increased 30 psi, OAP unchanged, OOAP unchanged overnight. SV,WV,=C. SSV, MV=O. IA, OA, OOA=OTG. NOVP. 1000. FLUIDS PUMPED BBLS 3 DIESEL 3 TOTAL TREE= FMC GEN 1 WELLHEAD= ' FMC 0602A SAFL, . NOTES: WELL ANGLE>70°@ 10710'. __._.. -._-.. ***4-1/2"CHROME TBG*" ACTUATOR= AXELSON KB ELEV= 64' BOP 3200' 20"COND, — 100'E ELEV= , 2121' —14-1/2"HES X NIP, ID=3.813" _Max Angle= -105°@ 12037' 94#, H-40, Datum MD= 10363' ID=19.124" x 2316' H9-5/8" FOC Datum TVD= 8800'SS �� 2441' —{9-5/8" FOC 9-5/8"CSG,47#, SOFT RS-95 XO TO N-80 BUTT --- 2295' ' II. 13-3/8"CSG, 72#,J&L N-80 BUTT, ID=12 347" H 2695' . . 3150' HEST TOP OF CEMENT(07/19/03 RWO) • GAS LIFT MANDRELS ♦ ST MD TVD DEV TYPE VLV LATCH FORT DATE • 9-5/8"CSG,47#, N-80 XO TO SOFT RS-95 BUTT 8216' ♦ 4 3529 3516 17 KBG-2 DOME BK 16 05/11/11 61 t 3 6788 5992 41 KBG-2 SO 8K 20 05/11/11 • 2 8410 7295 36 KBG-2 DMY BK 0 07/19/03 • 1 9408 8113 35 KBG-2 DMY BK 0 07/19/03 • Minimum ID = 2.377" @ 9679' • 9466' —14-1/2'•HES X NIP, ID=3.813" IKB LINER TOP PACKER � • ;:.1 1..9487' --7"X 4-1/2"BKR S-3 PKR,ID=3.875" 1 I • 9511' H 4-1/T HES X NIP, ID=3.813" 7"TIEBK LNR, 26#,L-80 BTC-M, — 9593' 0383 bpf, ID=6.276" $ • 4 ♦ 9679' ELM ---1 KB LNR TOP PKR, ID=2.377" =' 9691' —13.70" BKR DEPLOY SLV, ID=3.00" A ilii _o 1 9712' —13-1/2"OTIS X NIP,ID=2.812' 3-1/2'LNR,9.3#,L-80 STL, 0087 bpf, ID=2.992" — 9744' 4 g I !o 9744' —13-1/2"X 3-3/16"XO, ID=2.786' • • I' 9778' —14-112"HES XN NIP, MILLED TO 3.80(4/12/11) 4-1/2"TBG, 12 6#, 13CRVAMACE, — 9800' 4 i . 0152 bpf, ID=3.958" \ �.., ••♦•.• 9800' H4-1/2"WLEG, ID=3.958" BEHIND •••♦• .♦•••. L 9899' —CASING HOLE 9898'-9929' LNR ♦•♦:i O•♦� ♦♦• •i♦♦ ♦ . 9-5/8' CSG,47#, SOFT RS-95 — 9977' H7♦♦ ♦♦♦• (RIG SQZ 01/22/90) XO TO SOFT N-80 BUTT ♦•♦•• .♦ • WHIPSTOCK(04/15/11) ♦♦♦ ♦♦ 10054' •• 444 *. \ MILLOUT WINDOW 06-02A 10055'- 10064' 9-5/8"CSG,47#,SOFT N-80 BUTT, ID=8 681" — —10064 ♦�♦�• �, 4 ••• .` PERFORATION SUMMARY ••••4 4 10630' —3-1/2"CIBP(04/04/12). REF LOG.SLB MCNU CR/CCL ON 05/04/11 t•_4_•4- ANGLE ATTOP PERE 58°@10582' ♦♦ ►•• 11114' —3-3116"X2-7/8"XO, 10=2.37T' Note Refer to Production DB for historical perf data •�•�4 ►•�•! SIZE SPF INTERVAL Opn/Sqz DATE ••4 t ••� 2" 6 10582- 10592 0 04/02/12 ♦•• . 4♦• 2" 6 10800- 10950 0 05/05/11 le 2" 6 11000- 11350 0 05/05/11 0765555•111, 3-3/16" LNR 6 2#, L-80 TCII, .0087 bpf, ID=2.80" H 11114' PBTD — 11412' 1 4I1 ..• 2.7/8"LNR,6 4#,6.80 STL, .0058 bpf, ID=2.441" — 11450' DATE REV BY COMMENTS DATE REV BY COMMENTS PRUDHOE BAY UNIT 10/30/78 N1ES ORIGINAL COMPLETION 05/27/11 PJC DRLG DRAFT CORRECTIONS WELL: 06-02A 01/30/90 AUDI 4 RWO 06/26/11 AK/PJC FINAL DRLG CORRECTIONS PERMIT No:'2110260 07/19/03 N4ES RRNO 04/03/12 TTR/PJC ADPERFS(4/2/12) AR No: 50-029-20282-01 06/11105 JGM/PJC CTU 9 3-1/2"LNR 04/05/12 TTRIJMD SET CIBP(04/04/12) SEC 2,T10N,R14E 607'FSL&1164'FEL 05/07111 NORDIC CTDSIDETRACK(06-02A) 05/25/11 PJC DRLG HO CORRECTIONS BP Exploration (Alas ka) TEtVED SEP 3 0 r/ Alska Oil&Gas Cons. Commission BAKER Anchorage HUGHES www.bakerhughes.com PRINT DISTRIBUTION LIST COMPANY BP EXPLORATION (ALASKA), INC COUNTY NORTH SLOPE BOROUGH WELL NAME 06-02A STATE ALASKA I-ILLU PKUVHUL BAY UNI I DAIL 9/28/2011 THIS DISTRIBUTION LIST AUTHORIZED BY: DEBBIE HOKE SO#3759970 Log Film Log Film Copies Copies Client / Partners Copies Copies Client/ Partners 2 Company BP EXPLORATION(ALASKA), INC Company Person PETROTECHNICAL DATA CENTER Person Address LR2-1 Address 900 E BENSON BLVD ANCHORAGE,AK 99508 1 Company EXXON MOBIL PRODI ICTION CO Company Person FILE ROOM Person Address 800 BELL STREET Address EMB GSC 3082 A HOUSTON,TX 77002 1 Company STATE OF ALASKA-AOGCC Company Person CHRISTINE MAHNKEN Person Address 333 W.7TH AVE. Address SUITE 100 ANCHORAGE,AK 99501 Company Company Person Person Address Address Company Company Person Person Address Address Company Company Person Person Address Address Page 1 of I RECEIVED SEP 30 2011 Iffa u Alaska Oil&Gas Cons.Commission BAKER Anchorage HUGHES www.bakerhughes.com PRINT DISTRIBUTION LIST COMPANY BP EXPLORATION (ALASKA), INC COUNTY NORTH SLOPE BOROUGH WELL NAME 06-02APB1 STATE ALASKA FIELD PRUDHUE I3AY UNI I DAIt 9/29/2011 THIS DISTRIBUTION LIST AUTHORIZED BY: DEBBIE HOKE 2 I'• o 26 SO#3759970 Log Film Log Film Copies Copies Client / Partners Copies Copies Client/ Partners 2 Company BP EXPLORATION(ALASKA), INC Company Person PETROTECHNICAL DATA CENTER Person Address LR2-1 Address 900 E BENSON BLVD ANCHORAGE,AK 99508 1 Company EXXON MOBIL PRODUCTION CO Compa ry Person FILE ROOM Person Address 800 BELL STREET Address EMB GSC 3082 A HOUSTON,TX 77002 1 Company STATE OF ALASKA-AOGCC Company Person CHRISTINE MAHNKEN Person Address 333 W.7TH AVE. Address SUITE 100 ANCHORAGE,AK 99501 Company Company Person Person Address Address Company Company Person Person Address Address Company Company Person Person Address Address Page I of 1 wr BAKER HUGHES www.akerhughes.com West 795 East 94th Avenue Anchorage,AK 99515 FIRECPTel: 907-267-6612 �� Fax: 907-267-6623 September29, 2011 SERE$ Gl_ Attention: Christine Mahnken State of Alaska-AOGCC c!-? 0 333 West 7th Avenue Suite 100 Alaska Oil&Gas Cons. Comnassion Anchorage, AK 99501 Subject: Final Log Distribution— BP Exploration (Alaska), Inc. 06-02APB1 Prudhoe Bay Unit North Slope Borough, AK API #: 50-029-20282-70 Rig: Nordic-1 SO#: 3759970 Please find enclosed the following final deliverables for the above well: 1 Set of Color Prints (to follow) 1 Survey Report 1 Data CD We sincerely appreciate the opportunity to provide our products and services to you and look forward to working with you in the future. Should you have any questions, you can contact me at(907) 267-3420. Regards, Jim Woods Geoscience Advisor Enclosures JW/dh ra ' BAKER HUGHES IIIIIIIIIIIIIIIIIIIrpplit www.bakerhughes.com cI° (1° West �Q 795 East 94th Avenue S ��Ci��� Anchorage,AK 99515 $Cjo� Tel 907-267-6612 1 �aOb. . ege Fax 907-267-6623 September 28, 2011 Attention: Christine Mahnken State of Alaska-AOGCC 2-1`-c2G C_ 333 West 7th Avenue Suite 100 Anchorage, AK 99501 Subject: Final Log Distribution— BP Exploration (Alaska), Inc. 06-02A Prudhoe Bay Unit North Slope Borough,AK API #: 50-029-20282-01 Rig: Nordic-1 SO#: 3759970 Please find enclosed the following final deliverables for the above well: 1 Set of Color Prints (to follow) 1 Survey Report 1 Data CD We sincerely appreciate the opportunity to provide our products and services to you and look forward to working with you in the future. Should you have any questions, you can contact me at(907) 267-3420. Regards, Jim Woods Geoscience Advisor Enclosures JW/dh E E 0 Uo 00 C L S o M U y2 mch a, CO 2 so > --' m Y C7 c a Y u) o y «, t Q v0 m °� m ^ m C m ro Q 0 y co os = w N• O t0 U iD C ❑ C MO m Y t U \ o v 'g •" N C M U O N to t0 .- M C - Y f5QQNfQ 06 u) M N Q o> ' 0 m m <o A C Y 0 o r— 0. 0 '�' EU m N Z C) Q N Q J \ as CO zz r r r r r r r r r r r V.. rrr r r r r ,- 0.) y AC W 7 = 7 07 Ra6Ri!0 Q_ ❑ 7 7 7 7 ' 4 ai 2 7 O N t0 CO r O r O r r N r 4 r r M O 1 LL1 0 0 0 s, N C U "' W a _a i d �/ J ad o 0 �W25 N Z r i 0 J 0 = J 0 i O Z '_ z Z � Utn </) u) V) V) tnOt� � � m » m z 0p0ec 0W0 000000 ❑ OW0OJ ❑ O F- 1- 1- 1- 1- 1- w W 3: J § J ❑ ❑ ❑ ❑ C) ❑ R U. W W W LL W W W w W W OYO5O5' 0009000 z mamf- m ►- 333 � � 3 awdv) aa) 000C30 ❑ 0 11JG. mdm JJJJJJ Z z usm C9 c- O ' O r °' N O O O 0 CO o ro o co >- C O p O O p OO 0999 '1, 2 co a OaaOaetoa co C) a o J > JU ❑ > J -7 -1 C% 1-LU W r m Q m m m Q m m m m m m 0 ^: W C I Y 0 -- CU', o w C N M C cILB 004 ` L H p C 0 rG 73 ?i aSD o mi m d - < < < ° mm Qmrx': ;.+ Q 03 T nos Itilro U ` m m CO mr � > oo , CO O -C L., CO ca N ,.. 90M r �y Z a ea a ai a 0 Q ( E a rn m O N 0 2 w 2 C.2 00 N V Z _O illLL, ` O CA C ' L U QNaa r( a a .T. Letter of Transmittal IMO BAKER Date: May 12, 2011 HUGHES To: From: State of Alaska AOGCC Baker Hughes INTEQ 333 W. 7th Ave., Suite 100 795 East 94th Avenue Anchorage, Alaska 99501 Anchorage, Alaska 99515 Bill Michaelson Please find enclosed the directional survey data for the following well(s): P2-04L1 2 if- 007 14-33A a >>-oo i 02-12C xtt - ofy 06-02APB 1 06-02A ;it/ - 0�( Enclosed for each well(s): 2 hardcopy prints of directional survey reports 1 compact disk containing electronic survey files Please sign and return one copy of this transmittal form to: BP Exploration (Alaska) Inc. Petrotechnical Data Center, LR2-1 900 E. Benson Blvd. Anchorage, Alaska 99508 to acknowledge receipt of this data. RECEIVED BY: V, d State of Alaska AOGCC DATE: !c 1,4 STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMMISS...,N WELL COMPLETION OR RECOMPLETION REPORT AND LOG la. Well Status: ®Oil 0 Gas 0 SPLUG 0 Other 0 Abandoned 0 Suspended lb. Well Class: 2OAAC 25.105 2OAAC 25.110 ® Development 0 Exploratory 0 GINJ 0 WINJ 0 WAG 0 WDSPL 0 Other No.of Completions One 0 Service 0 Stratigraphic 2. Operator Name: 5.Date Comp.,Suis,or Aband.:5,1t► 12. Permit to Drill Number. BP Exploration(Alaska)Inc. 5)7/2011 512-7 211-026 3. Address: 6.Date Spudded: 13. API Number. P.O.Box 196612,Anchorage,Alaska 99519-6612 4/16/2011 50-029-20282-01-00 4a. Location of Well(Governmental Section): 7.Date T.D.Reached: 14. Well Name and Number. .I-r'81 Surface: 5/2/2011 PBU 06-02A 607'FSL, 1164'FEL,SEC 02,T1ON,R14E, UM 8. KB(ft above MSL): 64. 15.Field/Pool(s): Top of Productive Horizon: 940'FNL, 1603'FWL,SEC 02,T1ON,R14E,UM GL(ft above MSL): Prudhoe Bay Field/Prudhoe Bay Total Depth: 9.Plug Back Depth(MD+TVD): Oil Pool 987'FNL,937'FWL,SEC 02,T1ON,R14E,UM 11412' 9041' 4b. Location of Well(State Base Plane Coordinates,NAD 27): 10.Total Depth(MD+TVD): 16. Property Designation: Surface: x- 685818 y- 5941201 Zone- ASP4 11450' 9042' ADL 028311 TPI: x- 683211 y- 5944871 Zone- ASP4 11.SSSV Depth(MD+TVD): 17. Land Use Permit: Total Depth:x- 682546 y- 5944808 Zone- ASP4 None • 18.Directional Survey: ®Yes ❑No 19.Water depth,if offshore: 20. Thickness of Permafrost(TVD): (Submit electronic and printed information per 20 AAC 25.050) _ N/A ft MSL 1900'(Approx.) 21.Logs Obtained (List all logs here and submit electronic and printed information per 20 AAC 25.071): 22. Re-Drill/Lateral Top Window MD/TVD: MWD DIR, GR, RES, GR/CCL/MCNL 10054' 8634' 23. CASING,LINER AND CEMENTING RECORD SernaG DEPTH MD Serra4u DEPTH Ivo Hotz AMOUNT CASING Wr.PER Fr. GRADE TOP BOTTOM Toe 'BoTTOM SIZE CEMENTING RECORD PULLED 20" 94# H-40 _Surface 118' Surface 118' 32" 269 sx Permafrost 13-3/8" 72# N-80 Surface 2695' Surface 2695' 17-1/2" 7200 sx Arcticset II 9-5/8" 47# N-80/RS95 Surface 10054' Surface 8634' 12-1/4" 1200 sx Class'G' 7" 26# L-80 ,Surface 9593' Surface 8263' Inside Pioe 835 sx Class'G' 3-1/T x 3-3/16" 9.3#/6.2# L-80 9691' 11450' 8343' 9042' 4-1/4" 145 sx Class'G' / x 2-7/8" /6.4# 24. Open to production or injection? ®Yes 0 No 25. TuBNG RECORD If Yes,list each interval open (MD+TVD of Top&Bottom;Perforation Size and Number): __ SIZE DEPTH SET(MD) PACKER SET(MD/TVD) 2"Gun Diameter,6 spf 4-1/2", 12.6#, 13Cr80 9800' 9487'/8177' MD TVD MD TVD 10800'-10950' 9042'-9041' ., 26. ACID,FRACTURE,CEMENT SQUEEZE,ETC. 11000'-11350' 9042'-9041' !,,.iIML I/OMi i 1Ip I DEPTH INTERVAL(MD)) AMOUNT AND KIND OF MATERIAL USED • I' ,•• 2500' Freeze Protected w/60 Bbls of Diesel 4 `IF I J\ - rr 27. PRODUCTION TEST Date First Production: Method of Operation(Flowing,Gas Lift,etc.): May 18,2011 Flowing Date of Test Hours Tested: Production For OIL-BBL: GAS-MCF: WATER-BBL: CHOKE SIZE: GAS-OIL RATIO: 5/21/2011 12 Test Period 4 70 1,147 718 75 16,458 Flow Tubing Casing Press: Calculated OIL-BBL: GAS-MCF: WATER-BBL: OIL GKAvrry-API(cowry Press. 383 1,000 24-Hour Rate 4 209 3,441 2,153 Not Available 28. CORE DATA Conventional Core(s)Acquired? 0 Yes IN No Sidewall Core(s)Acquired? 0 Yes ®No If Yes to either question,list formations and intervals cored(MD+TVD of top and bottom of each),and summarize lithology and presence of oil,gas or water (submit separate sheets with this form,if needed). Submit detailed descriptions,core chips,photographs and laboratory analytical results per 20 AAC 250.071. None RECEPIED RBDMS MAY 2 7 7O � 1A�r s, 'j Cit cfar 7)1 Form 10-407 Revised 12/2009 CONTINUED ON REVERSE Alas ojj p 8 .1,MI6. 3,iiii)ISS10l u mit Original Only ,' Ori: Ilufal�® 0 6 29. GEOLOGIC MARKERS(List all formations and mark( countered): 30. F ATION TESTS NAME MD TVD Well Tested? 0 Yes 18]No Permafrost Top If yes,list intervals and formations tested,briefly summarizing test Permafrost Base results. Attach separate sheets to this form,if needed,and submit detailed test information per 20 MC 25.071. Top CGL 10250' 8794' None Base CGL 10360' 8875' 23SB/Zone 2B 10442' 8925' 22TS 10560' 8986' 21TS/Zone 2A 10690' 9037' Formation at Total Depth(Name): 21TS/Zone 2A 10690' 9037' 31.List of Attachments: Summary of Daily Drilling Reports,Well Schematic Diagram,Surveys 32.I hereby certify that the foregoing is true and correct to the best of my knowledge. Date: �Q,,(� D� Signed: Terrie Hubble th UL4N V 'e Title: Drilling Technologist /Ij+ �� PBU 06-02A 211-026 Prepared By Name/Number. Terrie Hubble, 564-4628 Well Number Permit No./Approval No. Drilling Engineer: Zach Sayers,564-5790 INSTRUCTIONS General: This form is designed for submitting a complete and correct well completion report and log on all types of lands and leases in Alaska. Submit a well schematic diagram with each 10-407 well completion report and 10-404 well sundry report when the downhole well design is changed. Item la: Classification of Service Wells: Gas Injection,Water Injection,Water-Alternating-Gas Injection,Salt Water Disposal,Water Supply for Injection, Observation,or Other. Multiple completion is defined as a well producing from more than one pool with production from each pool completely segregated. Each segregated pool is a completion. Item 4b: TPI(Top of Producing Interval). Item 8: The Kelly Bushing and Ground Level elevation in feet above mean sea level. Use same as reference for depth measurements given in other spaces on this form and in any attachments. Item 13: The API number reported to AOGCC must be 14 digits(ex: 50-029-20123-00-00). Item 20: Report true vertical thickness of permafrost in Box 20. Provide MD and TVD for the top and base of permafrost in Box 28. Item 23: Attached supplemental records for this well should show the details of any multiple stage cementing and the location of the cementing tool. Item 24: If this well is completed for separate production from more than one interval(multiple completion),so state in item 1,and in item 23 show the producing intervals for only the interval reported in item 26. (Submit a separate form for each additional interval to be separately produced, showing the data pertinent to such interval). Item 27: Method of Operation: Flowing,Gas Lift,Rod Pump,Hydraulic Pump,Submersible,Water Injection,Gas Injection,Shut-In,or Other(explain). Item 28: Provide a listing of intervals cored and the corresponding formations,and a brief description in this box. Submit detailed description and analytical laboratory information required by 20 MC 25.071. Item 30: Provide a listing of intervals tested and the corresponding formation,and a brief summary in this box. Submit detailed test and analytical laboratory information required by 20 MC 25.071. Form 10-407 Revised 12/2009 Submit Original Only TREE= FMC GEN 1 WELLHEAD= FMC ACTUATOR= AXELSON 0 6-02A 01/SAFETY0) ,HROMET BGTI LNRON T 10725" KB.ELEV= 64' DRAFT CTD sidetrack BF.ELEV= j I KOP= 3200' OA x OOA communication - limit to 500psi Max Angle= 46 @ 5200' Datum MD= 10363' 2121' -14-1/2"HES X NIP, ID=3.813" Datum TVD= 8800'SS 2316' -19-5/8"FOC III 20"CONDUCTOR,94#,H-40, ID=7 -I 100' 2441' -9-5/8"FOC 13-3/8"CSG,72#,J&L N-80, ID=12.347" -1 2695' I 5 1.1 3150' -JEST TOP OF CEMENT(07/19/03 RWO) N/ 1A1 4 1v4 GAS LIFT MANDRELS 4 1j. ST MD TVD DEV TYPE VLV LATCH PORT DATE '� 1 - 4 3529 3517 17 KBG-2 DMY BK 0 11/10/10 t1 1A4 •, 3 6788 5985 41 KBG-2 DMY BK 0 11/10/10 t, 1.4.4 2 8410 7285 36 KBG-2 DMY BK 0 07/19/03 Minimum ID = 2.377" @ 9679' �� �.• 1 9408 8102 35 KBG-2 DMY BK 0 07/19/03 45 KB Liner Top Packer 4 v 4 11 4. ,AI 9466' -14-1/2"HES X NIP, ID=3.813" i,1 Ir4 iN 14 4. 4 t'4 9487' -17"X 4-1/2"BKR S-3 PKR,ID=3.875" t r4 r4 V N 14 0 14. 9511' -14-1/2"HES X NIP, ID=3.813" 7"TIEBK LNR,26#,L-80 BTC-M, - 9593' N �.. •.0383 bpf, ID=6.276" �' • 4-1/2"TBG, 12.6#, 13CR ...'.`.-- -,.0152 bpf, ID=3.958" 9799' --Liner top Packer- 9,679' TSGR – 9900' — -- TOL and TOC - 9,687' 9778' -4-1/2"HES XN NIP, ID=38" 3-1/2"TBG, 9.3#,L-80, STL H 9795I. . I III 9800' 4-1/2"WLEG,ID=3.958" , 9800' ELMD TT LOGGED 11/23/03 a • 9899' I-CASING HOLE 9898'-9929' 1Z/151' '"i) (RIG SQZ 01/22/90) ,_ �� ' TOW at 10,055' a Z4 exi' /3-3/16 x 2-417m/p0<-r11,114' 37 dee L '.."------/ I Lowside Pilot hole to 10,080' PBTD - 11,412' --'4 WV. Cut tubing - 10,090' TD - 11,450'L PERFORATION SUMMARY ►������i�.t�*� T �7 REF LOG:SLB MCNL on 4-May-2011 ���� •�•�� 10108' -iTOC from 11!19110 CB (Q, t� ANGLE ATTOP PERF:91 @ 10800' • �����1 ����e 3-1/2 CIBP - 10,120 Note:Refer to Production DB for historical perf data ������ ►���t SIZE SPF INTERVAL Opn/Sqz DATE � 4 • 2.0" 6 10800-10950 0 05/05/11 .1 2.0" 6 11000- 11350 0 05/05/1' j�j�. ��ALA6. 10522' 3-1/2"BKR LANDING COLLAR . 4 :- '11 DRILLED/MILLED OUT 7/3/05 3-1/2"LNR,9.3#,13CR STL,.0087 bpf,ID=2.992" H 10520' , PBTD(08/07/05) -1 10567' ELMD 10567' ELMD UNKNOWN SOLID HARD FILL 1v•v4W•v•••♦ _ (TAGGED 08/07/05) 9-5/8"CSG,47#,RS-95/NT-80 BUTT, ID=8.681" H 10820' /•�•�•�•�1�����.�����4 H 10835' /�4�4.4.4.4.4.4.4.4. TD4. DATE REV BY COMMENTS DATE REV BY COMMENTS PRUDHOE BAY UNIT 10/30/78 N1ES ORIGINAL COMPLETION 11/14/10 CJN/AGR GLV C/O(11/10/10) WELL: 06-02 01/30/90 AUDI 4 RWOPERMIT No: 1770780 07/19/03 N4ES RWO API No: 50-029-20282-00 06/11/05 JGM/PJC CTU 9 3-1/2"LNR SEC 2,T1ON,R14E,3500.19'FEL&751.24'FNL 10/01/07 AMS/PJC 3-1/2"LNR CORRECTIONS 11/16/09 TAQ/PJC CMT TOP CORRECTIONS I BP Exploration(Alaska) North America-ALASKA- BP Page 1 of 38 Operation Summary Report Common Well Name:06-02 AFE No Event Type: RE-ENTER-ONSHORE(RON) Start Date:4/9/2011 End Date: 5/2/2011 X3-00YL3-C(2,537,875.00) Project: Prudhoe Bay Site: PB DS 06 Rig Name/No.: NORDIC 1 Spud Date/Time:5/1/1978 12:00:00AM Rig Release:5/7/2011 Rig Contractor: NORDIC CALISTA UWI:500292028200 Active Datum:2:02 5/1/1978 00:00 @64.00ft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (ft) 4/9/2011 06:00 - 07:30 1.50 MOB P PRE RIG RELEASE FROM 14-33A AT 06:00. CREW CHANGE. SECURE BOP STACK. 07:30 - 07:45 0.25 MOB P PRE PJSM TO SERVICE KOOMEY 07:45 - 08:30 0.75 MOB P PRE SERVICE KOOMEY AND CHECK PRE-CHARGE. 08:30 - 08:45 0.25 MOB P PRE •WELL PREP ON 06-02A NOT DONE. PJSM TO REBUILD MUD PUMP#1. 08:45 - 14:30 5.75 MOB P PRE REBUILD MUD PUMP#1. ADJUST BARKDALE VALVE HYD ACTUATOR FOR LOWER PIPE RAMS AND TEST FUNCTION. 14:30 - 15:00 0.50 MOB P PRE PJSM TO MOVE RIG OFF WELL 14-33A. 15:00 - 17:30 2.50 MOB P PRE MOVE RIG OFF WELL AND OVER TO DS 6. 17:30 - 19:00 1.50 MOB P PRE WAIT ON PAD PREP. 19:00 - 19:30 0.50 MOB P PRE PJSM TO MOVE RIG OVER WELL 06-02A. 19:30 - 21:00 1.50 MOB P PRE MOVE RIG OVER WELL,LEVEL AND SET DOWN. 21:00 - 23:00 2.00 RIGU P PRE RIG ACCEPT AT 21:00. SECURE CELLAR,SPOT AND HOOK UP CUTTINGS BOX,WELDING SHOP AND FUEL TRAILER. 23:00 - 00:00 1.00 RIGU P PRE REMOVE TREE CAP AND NU BOPE. 4/10/2011 00:00 - 04:00 4.00 RIGU P PRE NU BOPE. VERIFIED THAT TREE BOLTS WERE TESTED FOR PROPER TORQUE. 04:00 - 04:30 0.50 RIGU P PRE CONDUCT RIG EVACUATION DRILL, H2S DRILL,MAN DOWN DRILL AND CONDUCT AAR. • 04:30 - 05:00 0.50 BOPSUR P PRE AOGCC REP CHUCK SCHEEVE WAIVED WITNESS. RU AND FUNCTION TEST BOP'S. FULL BODY TEST. 05:00 - 06:00 1.00 BOPSUR P PRE GREASE VALVES ON BOP STACK. 06:00 - 07:30 1.50 BOPSUR P PRE TEST BOP. SWAB FAILURE-CALL GREASE CREW. 07:30 - 08:30 1.00 BOPSUR P PRE GREASE MASTER AND SWAB VALVE WITH GREASE CREW. 08:30 - 13:00 4.50 BOPSUR P PRE TEST BOPE. 0 P 250PSI LOW/3500 PSI HIGH,ANNULUR 2500PSI. 13:00 - 18:00 5.00 BOPSUR N SFAL PRE VALVE 15 ON CHOKE MANIFOLD FAILED. R&R VALVE 15 AND REBUILD VALVE 6. 18:00 - 22:00 4.00 BOPSUR P PRE TEST BOPE.250PSI LOW/3500PS1 HIGH, ANNULUR 2500PSI. 22:00 - 00:00 2.00 BOPSUR P PRE RU AND TEST TREE FLANGES AGAINST SSV. 250 PSI LOW/3500 PSI HIGH FOR 5 MINUTES • EACH. 4/11/2011 00:00 - 01:30 1.50 BOPSUR P PRE RU AND TEST TREE FLANGES AGAINST SSV. 250 PSI LOW/3500 PSI HIGH FOR 5 MINUTES EACH. 01:30 - 02:00 0.50 WHSUR P DECOMP PJSM WITH TWC CREW TO RU,TEST LUBRICATOR AND PULL TWC. Printed 5/25/2011 3:54:37PM North America-ALASKA- BP Page 2 of 38 Operation Summary Report Common Well Name:06-02 AFE No Event Type: RE-ENTER-ONSHORE(RON) Start Date:4/9/2011 End Date:5/2/2011 X3-00YL3-C(2,537,875.00) Project:Prudhoe Bay Site: PB DS 06 Rig Name/No.: NORDIC 1 Spud Date/Time: 5/1/1978 12:00:00AM Rig Release: 5/7/2011 Rig Contractor: NORDIC CALISTA UWI: 500292028200 Active Datum:2: 02 5/1/1978 00:00 @64.00ft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (ft) 02:00 - 03:30 1.50 WHSUR P DECOMP RU AND TEST LUBRICATOR AND PULL TWC. RD VALVE CREW. 03:30 - 04:00 0.50 WHSUR P DECOMP 30 MINUTE FLOW CHECK WELL.WELL ON A VAC. 04:00 - 05:00 1.00 WHSUR P DECOMP LOAD OUT LUBRICATOR AND CLEAR FLOOR. STRAP 2JTS 2-3/8"PH6. 05:00 - 05:30 0.50 WHSUR P DECOMP PJSM TO BRING BTT FISHING BHA TO RIG FLOOR. 05:30 - 06:30 1.00 WHSUR P DECOMP CUT 20'OF COIL TO INSTALL NEW COIL CONNECTOR. PULL TEST COIL CONNECTOR TO 40K. 06:30 - WHSUR P DECOMP PERFORM RIG EVACUATION DRILL WITH ENTIRE RIG TEAM AND CH2MHILL DRIVER. HOLD AAR REVIEW. DISCUSSED MUSTER AREA,NOTIFICATION OF DRILL SITE OPERATOR AND EMERGENCY NUMBERS. 07:00 - 08:30 1.50 WHSUR P DECOMP PRESSURE TEST HARDLINE, INNER REEL VALVE AND BTT DFCV. CHARTED TEST OF DFCV'S. 08:30 - 10:00 1.50 FISH P DECOMP MU BAKER FISHING BHA. 10:00 - 13:15 3.25 FISH P DECOMP RIH 13:15 - 16:00 2.75 FISH P DECOMP WT CHK AT 9700'CTMD=37K. RIW=20K ENGAGE FISH AT 9795'CTMD AND OVER PULL 10K CIRCULATE 1.5 TIMES BOTTOMS UP. SLIGHT TRIP GAS NOTED AT SURFACE WITH INITIAL BOTTOMS UP. TOOK RETURNS TO FLOW BACK TANK WITHOUT ANY ISSUE. POOH AND NOTED OVERPULLS AT THE TUBING TAIL AND X NIPPLES IN TUBING. OVERPULL TO 80 K AT—9460'. SET BACK DOWN WITH WEIGHT AND FISH APPEARED TO RELEASE(NO LONGER ANY ADDITIONAL WEIGHT). RBIH TO BOTTOM AND RE-ENGAGE FISH. 16:00 - 19:00 3.00 FISH P DECOMP POOH WITH SLIGHT OVERPULLS AT TUBING TAIL AND X NIPPLES. CONTINUE OOH WITH CHOKE CLOSED AND REPLACING VOIDAGE DOWN THE BACKSIDE OF THE COILED TUBING. TOTAL OF 2 JAR LICKS USED TO PULL FISH THROUGH JEWELRY. 19:15 - 19:45 0.50 FISH P DECOMP 30 MINUTE FLOW CHECK. 19:45 - 20:00 0.25 FISH P DECOMP POP INJECTOR OFF WELL. 20:00 - 21:00 1.00 FISH P DECOMP LD FISHING BHA(LOCKABLE SWIVEL,2 JT PH6, DFCV, BOWEN JAR INTENSIFIER,3 WEIGHT BARS,BOWEN OIL JARS,HYD DISCONNECT 3/4"BALL,5K RUPTURE DISK SUB AND 4"SEALABLE GS HYD RELEASE FISHING SPEAR. LD—300'OF 3-1/2"TBG.NORM TESTED ALL WITHIN LIMITS. 22:20 - 22:30 0.17 DHB P DECOMP PULL TEST CTC TO 20K AND PT TO 3,500 PSI. 22:30 - 22:45 0.25 DHB P DECOMP PJSM TO MU LEFT HAND MILLING BHA. (MILL, MOTOR,5K BURST DISK SUB,3/4"HYD DISCONNECT,2 JT 2-3/8"REG, DBPV AND DIMPLE CTC). Printed 5/25/2011 3:54:37PM North America-ALASKA- BP Page 3 of 38 Operation Summary Report Common Well Name:06-02 AFE No Event Type: RE-ENTER-ONSHORE(RON) Start Date:4/9/2011 End Date:5/2/2011 X3-00YL3-C(2,537,875.00) Project: Prudhoe Bay Site: PB DS 06 Rig Name/No.: NORDIC 1 Spud Date/Time:5/1/1978 12:00:00AM Rig Release:5/7/2011 Rig Contractor: NORDIC CALISTA UWI: 500292028200 Active Datum:2: 02 5/1/1978 00:00 @64.00ft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (ft) 22:45 - 23:50 1.08 DHB P DECOMP MU LEFT HANDED MILLING BHA. POP INJECTOR ONTO WELL. FOUND A BROKEN CARRIER ON INJECTOR AND REPLACED IT. 23:50 - 00:00 0.17 DHB P DECOMP RIH WITH MILLING BHA AT 100FPM. PUMPING 0.3 BPM. 4/12/2011 00:00 - 01:35 1.58 DHB P DECOMP RIH WITH LEFT HAND MILLING BHA(MILL, MOTOR,5K BURST DISK SUB,3/4"HYD DISCONNECT,2 JT 2-3/8"REG, DBPV AND DIMPLE CTC). 01:35 - 01:45 0.17 DHB P DECOMP WT CHECK UP WEIGHT 36K DOWN WEIGHT 19K. 01:45 - 02:00 0.25 DHB P DECOMP RIH CLEAN ALL THE WAY TO XN NIPPLE. DRY TAG AT 9797.8' .PAINT EOP FLAG(9716.12'). 02:00 - 02:30 0.50 DHB P DECOMP BEGIN MILLING 1.8 BPM, FS 1500 PSI. UP AND DOWN REAM 3 TIMES CLEAN. 02:30 - 02:35 0.08 DHB P DECOMP DRY DRIFT TO 9852'CLEAN. 02:35 - 03:00 0.42 DHB P DECOMP PULL UP INTO TUBING TAIL AND FLOW CHECK. NO FLOW. 03:00 - 05:15 2.25 DHB P DECOMP POH WITH MILLING BHA AT 80 FPM. PUMPING 1.1 BPM AT 650 PSI. PVT 301 BBL. IA 44 PSI,OA 54 PSI,OOA 50 PSI 05:15 - 06:00 0.75 DHB P DECOMP TAG UP AT SURFACE AND FLOW CHECK. NO FLOW. 06:00 - 15:00 9.00 CASING P DECOMP WO WSL CHANGE OUT 15:00 - 15:10 0.17 CASING P DECOMP WSL ON LOCATION, RIH TO FLAG AND • FIGURE OUT EOP FLAG DEPTH FLAG DEPTH IS BASED ON BIT DEPTH FROM MILLING XN AT 9778'.SUBTRACT BHA LENGTH+5'THAT WAS CUT TO REHEAD 9778'-81.7'=9696.3'-5=9691.3'EOP ADD 67.6'FOR NOZZLE BHA AND CORRECT DEPTH TO 9758.9' 15:10 - 15:25 0.25 CASING P DECOMP RIH TO TAG 3.5"LINER STUMP 10020'WT CK=38K RIHWT=19K TAG AT 10094', PU CLEAN AT 37K 15:25 - 15:45 0.33 CASING P DECOMP 10050'ONLINE AT 3.5 BPM PULLING UP TO 9750' 15:45 - 16:25 0.67 CASING P DECOMP PULLED TO 9750'CLEAN, RIH SLOW TO 10050'WAITING FOR A BOTTOMS UP TO MAKE SURE TUBING IS CLEAN AND SO I CAN GET MY FEET ON THE GROUND 16:25 - 16:40 0.25 CASING P DECOMP 10050'SLOW DOWN RIH SPEED AND CLEAN OUT TO 10070'AND CHASE TO 9750' 16:40 - 17:10 0.50 CASING P DECOMP PUMP 20 BBL BIOZAN PILL TAG STUMP AT 10094', PU 10'AND TAG AGAIN 10094'20 BBLS BIOZAN OUT,CHASE TO TT 17:10 - 17:30 0.33 CASING P DECOMP BOTTOMS UP WAS FAIRY CLEAN,CONTINUE CIRCULATING WAITING FOR CMT CREW 17:30 - 19:30 2.00 CASING P DECOMP CMT CREW ON LOCATION FIELD BLEND AT 14:15 2000 PSI 19:30 - 21:00 1.50 CASING P DECOMP STILL WAITING FOR SLB LAB UCA DATA AS PER PLAN BEFORE MIXING CEMENT Printed 5/25/2011 3:54:37PM North America-ALASKA- BP Page 4 of 38 Operation Summary Report Common Well Name:06-02 AFE No Event Type: RE-ENTER-ONSHORE(RON) Start Date:4/9/2011 End Date: 5/2/2011 X3-00YL3-C(2,537,875.00) Project:Prudhoe Bay Site: PB DS 06 Rig Name/No.: NORDIC 1 Spud Date/Time:5/1/1978 12:00:00AM Rig Release: 5/7/2011 Rig Contractor:NORDIC CALISTA UWI:500292028200 Active Datum:2:02 5/1/1978 00:00 @64.00ft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (ft) 21:00 - 21:30 0.50 CASING P DECOMP FIELD BLEND ON KICK OFF PLUG AT 3,000 PSI COMPRESSIVE STRENGHT AT 17.5 HRS. PJSM FOR CEMENT JOB WITH NORDIC, TRUCK DRIVERS AND SLB. GOOD INPUT FROM EVERYONE. 21:30 - 22:15 0.75 CASING P DECOMP PRESSURE TEST TO 4000 PSI AND BATCH UP CEMENT. 22:15 - 23:20 1.08 CASING P DECOMP PUMPED 10 BBL FRESH WATER INTO COIL. ZERO IN MICRO MOTION WHEN DENSITY HIT 14.0 PPG. PUMP 28BBLS 16.5 PPG CEMENT INTO COIL. AT 00:56 CEMENT WILL BEAT 70BC. PUMP 10 BBLS FRESH WATER INTO COIL. SWAP TO 1.5#BIOZAN. ZERO OUT MICRO MOTION WHEN CEMENT AT NOZZLE. PUMPING 1.1 BPM CEMENT IN 9-5/8"BELOW AND UP TO 100' ABOVE NOZZLE. OUT MM 0 BBLS RETURNED. NOZZLE DEPTH 10,080'.COIL SPEED 0 FPM. OUT MM 5 BBLS RETURNED. NOZZLE DEPTH 10,080'.COIL SPEED 0 FPM. OUT MM 8 BBLS RETURNED. NOZZLE DEPTH 10,080'.COIL SPEED 0 FPM. CEMENT IN 9-5/8"AND 100'ABOVE NOZZLE. OUT MM 9 BBLS RETURNED. NOZZLE DEPTH 10,069'.COIL SPEED 14 FPM. OUT MM 10 BBLS RETURNED. NOZZLE DEPTH 10,054'.COIL SPEED 14 FPM. OUT MM 15 BBLS RETURNED. NOZZLE DEPTH 9,980'.COIL SPEED 14 FPM. OUT MM 20 BBLS RETURNED. NOZZLE DEPTH 9,907'. COIL SPEED 14 FPM. CEMENT IN 4-1/2"AND 100'ABOVE NOZZLE. OUT MM 21 BBLS RETURNED. NOZZLE DEPTH 9,816'.COIL SPEED 66 FPM. OUT MM 25 BBLS RETURNED. NOZZLE DEPTH 9,405'.COIL SPEED 66 FPM. CEMENT TOP AT 9,305'PULL UP TO SAFETY AT 8,800'. 23:20 - 00:00 0.67 CASING P DECOMP LOTO REEL AND DROP 3/4"STEEL BALL. HEARD IT ROLLING AND GO OVER GOOSE NECK. 2 BPM AT 2,800PSI. BALL ON SEAT AT 53 BBL. 4/13/2011 00:00 - 01:30 1.50 CASING P DECOMP RIH TO 9780'PUMPING 2.96 BPM AT 3695 PSI. MADE 3 DOWN PASSES AND 2 UP PASSES FROM 9780'TO 9305'. SLOW DOWN TO 5 FPM WHILE TAKING CEMENT RETURNS OVERBOARD. FLOW CHECK WELL. NO FLOW. 01:30 - 02:45 1.25 CASING P DECOMP POOH PUMPING 2.96 BPM AT 3695 PSI. 78 FPM SLOW DOWN TO 5 FPM TO JET GLM'S (UP/DOWN/UP). 02:45 - 03:15 0.50 CASING P DECOMP FLOW CHECK WELL AT SURFACE. PJSM TO LD CEMENTING BHA AND PU SWIZZLE STICK BHA. Printed 5/25/2011 3:54:37PM North America -ALASKA-BP Page 5 of 38 Operation Summary Report Common Well Name:06-02 AFE No Event Type: RE-ENTER-ONSHORE(RON) Start Date:4/9/2011 End Date: 5/2/2011 X3-00YL3-C(2,537,875.00) Project: Prudhoe Bay Site: PB DS 06 Rig Name/No.: NORDIC 1 Spud Date/Time:5/1/1978 12:00:00AM Rig Release: 5/7/2011 Rig Contractor:NORDIC CALISTA UWI:500292028200 Active Datum:2:02 5/1/1978 00:00 @64.00ft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (ft) 03:15 - 04:00 0.75 CASING P DECOMP POP INJECTOR OFF WELL. LD CEMENTING BHA(2 JTS 2-3/8"PH6 AND A BALL DROP CEMENT NOZZLE 3/4"BALL). 04:00 - 04:45 0.75 CASING P DECOMP PU SWIZZLE STICK AND STINGER TO JET STACK. JET STACK. POP INJECTOR OFF WELL AND LD SWIZZLE STICK AND STINGER. 04:45 - 05:00 0.25 CASING P DECOMP PJSM WITH GREASE CREW. 05:00 - 06:35 1.58 CASING P DECOMP SERVICE TREE AND PT MASTER MASTER NOT HOLDING,SERVICE MASTER 06:35 - 07:00 0.42 CASING P DECOMP PT MASTER&SWAB TO 250 LOW AND 3500 PSI GOOD PT'S 07:00 - 08:00 1.00 CASING P DECOMP SUCK OUT STACK TO OPEN BOP INSPECTION DOORS 08:00 - 10:00 2.00 CASING P DECOMP OPEN BOP'S FOR VISUAL INSPECTION 10:00 - 10:20 0.33 CASING P DECOMP ALL RAM CAVITIES WERE CLEAN FLUID PACK STACK FOR SHELL TEST 10:20 - 11:00 0.67 CASING P DECOMP PT STACK TO 250 PSI LOW AND 3500 PSI HIGH AGAINST SWAB&MASTER 11:00 - 11:30 0.50 CASING P DECOMP GOOD SHELL TEST, RD TEST EQUIPMENT SLB SLING INSPECTOR IS HERE TO PERFORM 6 MONTH INSPECTION ON INJECTOR SLINGS 11:30 - 11:35 0.08 CASING P DECOMP INSPECTION COMPLETED 11:35 - 12:10 0.58 CASING P DECOMP REMOVE THE LOTO ON THE KOOMEY AND PRESSURE IT BACK UP 12:10 - 12:25 0.25 CASING P DECOMP PJSM TO CUT OFF CTC AND PUMP SLACK MANAGEMENT 12:25 - 12:40 0.25 CASING P DECOMP PU INJECTOR AND CUT OFF CTC 12:40 - 13:05 0.42 CASING P DECOMP STAB ON WELL AND SET UP TO REVERSE CIRCULATE 12:50 REVERSE CIRC FOR SLACK MANAGEMENT 13:05 - 14:00 0.92 CASING P DECOMP PU INJECTOR AND MU CT CUTTER 13:20 START CUTTING PIPE 13:45 CUT 320'OF COIL AND NO WIRE YET. THIS IS 2%WHICH IS AT THE SLB MAXIMUM FOR SLACK.RD CUTTER AND STAB ON TO PUMP WIRE FORWARD 14:00 - 14:15 0.25 CASING P DECOMP PUMP SLACK FORWARD 14:15 - 15:10 0.92 CASING P DECOMP WO NORDIC DRILLER TO FINISH CONFERENCE CALL TO PU INJECTOR 15:10 - 15:20 0.17 CASING P DECOMP PU INJECTOR AND CHECK FOR WIRE AND NO WIRE 15:15 PUMP AGAIN, PU AND WE HAVE WIRE 15:20 - 15:30 0.17 CASING P DECOMP MEG WIRE,GOOD MEG TEST 15:30 - 17:30 2.00 CASING P DECOMP DIMPLE PIPE FOR CTC -15:45 COIL DIMPLED,CIRC TO WARM COIL -15:55 PRESSURE TEAT CTC TO 3700 PSI -16:00 PT GOOD, MU BHI UQC -16:55 CIRC TO WARM COIL -17:05 PT UQC to 3500 PSI,GOOD PT 17:30 - 18:00 0.50 STWHIP P DECOMP MU MILLING BHA WITH NEW HCC 3.80"D331 PARABOLIC MILL. MILL GAUGED 3.80"GO 3.79"NO GO Printed 5/25/2011 3:54:37PM North America-ALASKA- BP Page 6 of 38 Operation Summary Report Common Well Name:06-02 AFE No Event Type: RE-ENTER-ONSHORE(RON) Start Date:4/9/2011 End Date:5/2/2011 X3-00YL3-C(2,537,875.00) Project: Prudhoe Bay Site: PB DS 06 Rig Name/No.: NORDIC 1 Spud Date/Time:5/1/1978 12:00:00AM Rig Release: 5/7/2011 Rig Contractor:NORDIC CALISTA UWI: 500292028200 Active Datum:2:02 5/1/1978 00:00 @64.00ft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (ft) 18:00 - 18:15 0.25 STWHIP P DECOMP BHA MADE UP AND INJECTOR STABBED ON WELL. 18:15 - 19:15 1.00 STWHIP P DECOMP CREW CHANGE AND PJSM. BLED OOA FROM 450 PSI TO 50 PSI. ALL ARTIC PAC. 19:15 - 21:30 2.25 STWHIP P DECOMP RIH WITH AT 100FPM WITH 3.80"MILLING BHA. PUMPING 0.3 BPM @ 800 PSI. CONDUCT TIE-IN FROM 8790'-8873'. MADE A-18'CORRECTION. RIH AND DRY TAG CEMENT AT 9760'. 21:30 - 21:45 0.25 STWHIP P DECOMP PU 30'BRING PUMPS UP TO 2.6 BPM AND RIH AT 0.3 FPM. FS 2730 PSI.TAG AT 9761'. 21:45 - 23:00 1.25 STWHIP P DECOMP ORIENT MILL TO 200 DEG. MILL AHEAD AT 9,761'MD. PUMPING 2.6 BPM AT 3100 PSI(370 PSI MOTOR WORK). DHWOB 2K. ECD/PVT: 9.86 PPG/315 BBL. MW IN 8.45 AND OUT 8.52 PPG. AVG ROP OVER LAST 1.25 HR=41 FPH. (FROM 9,761'-9,815'). 23:00 - 00:00 1.00 STWHIP P DECOMP MAINTAIN TFO AT 200 DEG ORIENTATION. MILL AHEAD AT 9815'MD AT 2.6 BPM AT 3050 PSI(320 PSI MOTOR WORK). DHWOB 2.4K. ECD/PVT: 9.80 PPG/315 BBL. MW IN 8.47 AND OUT 8.52 PPG. AVG ROP OVER LAST HOUR=62 FPH.(FROM 9,815'-9,877'). 4/14/2011 00:00 - 01:00 1.00 STWHIP P DECOMP MAINTAIN TFO AT 200 DEG ORIENTATION. MILL AHEAD AT 9877'MD AT 2.6 BPM AT 3050 PSI(320 PSI MOTOR WORK). DHWOB 2.4K. ECD/PVT: 9.80 PPG/314 BBL. MW IN 8.47 AND OUT 8.53 PPG. AVG ROP OVER LAST HOUR=46 FPH.(FROM 9,877'-9,923'). 01:00 - 02:00 1.00 STWHIP P DECOMP MAINTAIN TFO AT 200 DEG ORIENTATION. MILL AHEAD AT 9923'MD AT 2.6 BPM AT 3050 PSI(320 PSI MOTOR WORK). DHWOB 2.1K. ECD/PVT: 9.86 PPG/314 BBL. MW IN 8.48 AND OUT 8.53 PPG. AVG ROP OVER LAST HOUR=42 FPH. (FROM 9,923'-9,965'). 02:00 - 03:00 1.00 STWHIP P DECOMP MAINTAIN TFO AT 200 DEG ORIENTATION. MILL AHEAD AT 9965'MD AT 2.6 BPM AT 3000 PSI(270 PSI MOTOR WORK). DHWOB 2.2K. ECD/PVT: 9.84 PPG/314 BBL. MW IN 8.47 AND OUT 8.54 PPG. AVG ROP OVER LAST HOUR=40 FPH. (FROM 9,965'-10,005'). 03:00 - 04:00 1.00 STWHIP P DECOMP MAINTAIN TFO AT 200 DEG ORIENTATION. MILL AHEAD AT 10,005'MD AT 2.6 BPM AT 3000 PSI(270 PSI MOTOR WORK). DHWOB 2.5K. ECD/PVT: 9.84 PPG/314 BBL. MW IN 8.48 AND OUT 8.54 PPG. AVG ROP OVER LAST HOUR=40 FPH. (FROM 10,005-10,045'). BLED OOA FROM 450 PSI TO 50 PSI.ALL ARTIC PAC. Printed 5/25/2011 3:54:37PM North America-ALASKA- BP Page 7 of 38 Operation Summary Report Common Well Name:06-02 AFE No Event Type: RE-ENTER-ONSHORE(RON) Start Date:4/9/2011 End Date: 5/2/2011 X3-00YL3-C(2,537,875.00) Project: Prudhoe Bay Site: PB DS 06 Rig Name/No.: NORDIC 1 Spud Date/Time:5/1/1978 12:00:00AM Rig Release: 5/7/2011 Rig Contractor: NORDIC CALISTA UWI:500292028200 Active Datum:2:02 5/1/1978 00:00 @64.00ft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (ft) 04:00 - 05:00 1.00 STWHIP P DECOMP MAINTAIN TFO AT 200 DEG ORIENTATION. MILL AHEAD AT 10,045'MD AT 2.6 BPM AT 3020 PSI(290 PSI MOTOR WORK). DHWOB 2.4K. ECD/PVT: 9.85 PPG/314 BBL. MW IN 8.48 AND OUT 8.54 PPG. AVG ROP=40 FPH. (FROM 10,045-10,080'). IA 193 PSI/OA85 PSI/OOA88 PSI 05:00 - 05:45 0.75 STWHIP P DECOMP 'ORIENT THE TF TO 0 DEG AND BACK REAM FROM 9,809'UP TO TT AT 9,799'AT 1 FPM. PUMPING 2.6 BPM. BACK REAM AGAIN FROM 9,814'UP TO TT AT 9,799'AT 1 FPM. PUMPING 2.6 BPM. 05:45 - 06:30 0.75 STWHIP P DECOMP RIH TO 9,910'. LOG SECOND TIE IN PASS FROM 9,910'DOWN TO 9,935'. PUMPING MIN RATE 0.3 BPM. -4'CORRECTION. RIH TO TAG AFTER 4'CORRECTION 06:30 - 06:45 0.25 STWHIP P DECOMP TAG BOTTOM @ 10075.3', CONTINUE MILLING TO 10080' 06:45 - 07:15 0.50 STWHIP P DECOMP MILLED TO 10080', PU AND START HI-VIS PILL DOWNHOLE WHILE PULLING UP TO TT AND BACKREAM 07:15 - 07:30 0.25 STWHIP P DECOMP HI-VIS PILL AT THE MILL 07:30 - 07:45 0.25 STWHIP P DECOMP HI-VIS PILL OUT, CHASE TO TT 07:45 - 10:00 2.25 STWHIP P DECOMP OPEN EDC AND POOH PUMPING 3.0 BPM 10:00 - 10:20 0.33 STWHIP P DECOMP OOH,CHECK FOR FLOW AND HOLD PJSM TO LD THE MILLING BHA 10:20 - 10:50 0.50 STWHIP P DECOMP PU INJECTOR AND LD THE BHA 10:50 - 10:55 0.08 STWHIP P DECOMP ""'KICK DRILL WHILE LAYING DOWN THE BHA""" NON-SHEARABLE BHA WAS PULLED FROM THE WELL AND THE WELL SHUT SHUT IN 45 SEC.ALL PERSONNEL REPORTED BEEING AT THEIR STATION IN JUST OVER A MINUTE FROM THE TIME THE ALARM WAS TRIPPED. 10:55 - 11:15 0.33 STWHIP P DECOMP CLEAN OUT MICRO-MOTION, LOOKS LIKE CMT MIGHT BE PLUGGING THE TUBES AND CREATING BACK PRESSURE ON THE WELL 11:15 - 11:30 0.25 STWHIP P DECOMP WO BHI TO TEST TOOLS 11:30 - 11:45 0.25 STWHIP P DECOMP PJSM TO MU TOOLS 11:45 - 12:20 0.58 STWHIP P DECOMP MU CALIPER&MWD LOGGING TOOLS 12:05 CALIPER INITIATED AND SET TO OPEN IN 3 HRS AND 11 MIN AT 15:16 12:20 - 14:15 1.92 STWHIP P DECOMP TOOLS MADE UP INJECTOR STABBED ON WELL TEST TOOLS AND RIH 14:15 - 14:55 0.67 STWHIP P DECOMP TIE IN AT 9900'TO PDC LOG CORRECT DEPTH-22' 14:55 - 15:20 0.42 STWHIP P DECOMP TAG TD AND WAIT FOR FINGERS TO OPEN 15:20 - 15:35 0.25 STWHIP P DECOMP POOH LOGGING UP AT 50 FPM TO 9300' 15:35 - 15:40 0.08 STWHIP P DECOMP LOGGING COMPLETED POOH 15:40 - 16:20 0.67 STWHIP P DECOMP STOP TO OFF LOAD DIRTY BIOZAN AND REPLACE WITH NEW FROM TRUCK 16:20 - 18:05 1.75 STWHIP P DECOMP CONTINUE POOH Printed 5/25/2011 3:54:37PM North America -ALASKA- BP Page 8 of 38 Operation Summary Report Common Well Name:06-02 AFE No Event Type: RE-ENTER-ONSHORE(RON) Start Date:4/9/2011 End Date: 5/2/2011 X3-00YL3-C(2,537,875.00) Project:Prudhoe Bay Site: PB DS 06 Rig Name/No.: NORDIC 1 Spud Date/Time: 5/1/1978 12:00:00AM Rig Release:5/7/2011 Rig Contractor: NORDIC CALISTA UWI:500292028200 Active Datum:2: 02 5/1/1978 00:00 @64.00ft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (ft) 18:05 - 18:40 0.58 STWHIP P DECOMP OOH,FLOW CHECK WELL WHILE DOING CREW CHANGE 18:40 - 18:55 0.25 STWHIP P DECOMP PJSM TO LD CALIPER LOGGING TOOL W/ COIL TRAK BHA AND MU WHIPSTOCK DRIFT W/COIL TRAK BHA. 18:55 - 19:20 0.42 STWHIP P DECOMP POP INJECTOR OFF WELL AND LD LOGGING BHA#6. 19:20 - 19:30 0.17 STWHIP P WEXIT MU WS DRIFT BHA#7. 19:30 - 19:45 0.25 STWHIP P WEXIT STAB INJECTOR ONTO WELL. 19:45 - 21:45 2.00 STWHIP P WEXIT RIH 95 FPM,.3 BPM AT 1260 PSI, ECD 9.98, PVT 255 BLL,IA/OA/OOA=0/82/212. 21:45 - 22:15 0.50 STWHIP P WEXIT LOG TIE IN PASS FROM 9,900'TO 9,945'AT 1.5 FPM. CORRECT DEPTH-20.5'. UP WT 37K,DN WT 14.4K. 22:15 - 22:30 0.25 STWHIP P WEXIT RIH AND TAG TD TWICE AT 10,083'. PVT 308 BBL. 22:30 23:20 0.83 STWHIP P WEXIT LOG CCL FROM TD UP TO 9300'AT 17.7 FPM. PUMPING.35 BPM AT 1615 PSI. 23:20 - 23:40 0.33 STWHIP P WEXIT FLOW CHECK. NO FLOW. 23:40 - 00:00 0.33 STWHIP P WEXIT POH WITH WS DRIFT BHA. 100 FPM. PUMPING 1.0 BPM AT 1685 PSI. 4/15/2011 00:00 - 01:15 1.25 STWHIP P WEXIT POH WITH WS DRIFT BHA#7. 100 FPM. PUMPING 1.0 BPM. 01:15 - 01:30 0.25 STWHIP P WEXIT FLOW CHECK. NO FLOW. 01:30 - 01:45 0.25 STWHIP P WEXIT PJSM TO LD DRIFT BHA#7 AND PU WS SETTING BHA#8. 01:45 - 02:45 1.00 STWHIP P WEXIT POP INJECTOR OFF WELL. LD WS DRIFT BHA#7. MU WS SETTING BHA#8. 02:45 - 04:20 1.58 STWHIP P WEXIT RIH WITH WHIPSTOCK. 80 FPM PUMPING 0.35 BPM AT 1322 PSI. IA/OA/OOA=0/82/293 04:20 - 05:30 1.17 STWHIP P WEXIT RIH WITH WHIPSTOCK AT 6080'. PVT 288 BBL. 75 FPM PUMPING 0.35 BPM AT 1500 PSI.ECD 10 PPG. 05:30 - 06:00 0.50 STWHIP P WEXIT TIE IN LOG FROM 9920'to 9963'AT 1.4FPM. PUMPING.18 BPM AT 1465 PSI. CORRECT DEPTH-21.0'. RIH TO 10,066.4'.CLOSE EDC. 06:00 - 07:45 1.75 STWHIP P WEXIT SET TOP OF WS AT 10,054.' 07:45 - 08:10 0.42 STWHIP P WEXIT PJSM TO LD WS SETTING &MU WINDOW BHA'S FLOW CHECK WELL 08:10 - 08:40 0.50 STWHIP P WEXIT LD BHA 08:40 - 08:45 0.08 STWHIP P WEXIT WS BHA OOH,TOOLS SHIFTED CORRECTLY. 08:45 - 09:20 0.58 STWHIP P WEXIT GAUGE WINDOW AND STRING MILLS 3.80" GO AND 3.79"NO-GO ON BOTH MILLS MU WINDOW MILLING BHA 09:20 - 10:00 0.67 STWHIP P WEXIT STABBED ON,TEST TOOLS ***RU CT INSPECT FOR 2ND TRIAL TEST RUN*** 10:00 - 11:45 1.75 STWHIP P WEXIT SLB CT INSPECT IN PLACE, RIH AT MIN RATE THROUGH MOTOR Printed 5/25/2011 3:54:37PM North America -ALASKA- BP Page 9 of 38 Operation Summary Report Common Well Name:06-02 AFE No Event Type: RE-ENTER-ONSHORE(RON) Start Date:4/9/2011 End Date: 5/2/2011 X3-00YL3-C(2,537,875.00) Project: Prudhoe Bay Site: PB DS 06 Rig Name/No.: NORDIC 1 Spud Date/Time:5/1/1978 12:00:00AM Rig Release:5/7/2011 Rig Contractor: NORDIC CALISTA UWI: 500292028200 Active Datum:2: 02 5/1/1978 00:00 @64.00ft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (ft) 11:45 - 12:15 0.50 STWHIP P WEXIT TIE IN AT 9975' CORRECT DEPTH-19' RIH TO TAG PINCH POINT 12:15 - 12:30 0.25 STWHIP P WEXIT DRY TAG PINCH POINT AT 10056.6',UP WT= 40K RIH WITH PUMP AT FULL RATE TAG AND STALL AT 10055.6' 12:30 - 12:50 0.33 STWHIP P WEXIT 'TAG PINCH POINT AT SAME DEPTH START MILLING WINDOW 2.51N2.5OUT @3772PSI \r DHWOB=0.7K TO 1.5K WH/IA/OA/00A=22/7/84/385 PSI 12:50 - 13:45 0.92 STWHIP P WEXIT 10056.0 PVT=308 2.5 IN 2.5 OUT @ 3772 PSI DHWOB=2.0K WI-VIA/OA/00A=51/16/84/381 PSI J 4 A BLEED OOA BELOW 100PSI (p 13:45 - 14:40 0.92 STWHIP P WEXIT 10057.0 PVT=307 BLS 2.5 IN 2.5 OUT @3650 PSI DHWOB=2.65K WH/IA/OA/00A=40/35/81/62 PSI 14:20 ALLOW WOB TO DRILL OFF WOB=4.2K 14:40 - 15:10 0.50 STWHIP P WEXIT WHP HAS LOWERED SINCE WE HAVE BEEN CIRCULATING, PU TO CHECK FREE SPIN. FREE SPIN AT 3250 PSI CONTINUE MILLING WINDOW 15:10 - 16:55 1.75 STWHIP P WEXIT 10058.0 PVT=306 • 2.5 IN 2.5 OUT @ 3630 PSI DHWOB=3.76K WI-VIA/OA/00A=37/63/73/227 PSI 16:55 - 18:00 1.08 STWHIP P WEXIT 10059.0 PVT=303 2.5 IN 2.5 OUT @ 3615 PSI DHWOB=4.1K WI-VIA/OA/00A=37/63/73/227 PSI 18:00 - 19:00 1.00 STWHIP P WEXIT 10060.0 PVT=302 2.5 IN 2.5 OUT @3615 PSI DHWOB= 1.76K WH/IA/0A/00A=26/166/81/157 PSI 19:00 - 20:00 1.00 STWHIP P WEXIT 10,060.7'FS 3020 2.5 IN 2.5 OUT @3,160 PSI DHWOB=2.5K 20:00 - 21:00 1.00 STWHIP P WEXIT 10,061.8'FS 3,020 2.5 IN 2.5 OUT @3132 PSI DHWOB=2.8K 21:00 - 22:00 1.00 STWHIP P WEXIT 10,062.8'FS 3,020 2.5 IN 2.5 OUT @3,142 PSI DHWOB=2.4K 22:00 - 23:00 1.00 STWHIP P WEXIT 10,063.6'FS 3,020 2.5 IN 2.5 OUT @ 3,300 PSI DHWOB=3.2K STALLED AT 10,063.8'PU FREE. 23:00 - 00:00 1.00 STWHIP P WEXIT 10,064.1'FS 3,020 2.5 IN 2.5 OUT @ 3,200 PSI DHWOB= 1.4K CONTINUE TIME MILLING AT 1 FPH FOR 2' PAST BOTTOM OF WINDOW TO GET STRING REAMER PAST BOTTOM OF WINDOW. Printed 5/25/2011 3:54:37PM North America -ALASKA- BP Page 10 of 38 Operation Summary Report Common Well Name:06-02 AFE No Event Type: RE-ENTER-ONSHORE(RON) Start Date:4/9/2011 End Date: 5/2/2011 X3-00YL3-C(2,537,875.00) Project:Prudhoe Bay Site: PB DS 06 Rig Name/No.: NORDIC 1 Spud Date/Time:5/1/1978 12:00:00AM Rig Release: 5/7/2011 Rig Contractor:NORDIC CALISTA UWI: 500292028200 Active Datum:2: 02 5/1/1978 00:00 @64.00ft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (ft) 4/16/2011 00:00 - 02:30 2.50 STWHIP P WEXIT TOWS AT 10,054'/BOWS AT 10,062'. DRILLING 10'OF RAT HOLE FROM 10,064'TO 10,074'. PUMPING 2.5 BPM IN 2.5 BPM OUT @ 3,140 PSI. DHWOB=0.5K 02:30 - 04:20 1.83 STWHIP P WEXIT BOTTOMS UP SAMPLE HAS GOOD FORMATION IN IT AND ALOT OF METAL. MADE 6 CLEAN PASSES WITH PUMPS ON. SHUT DOWN PUMPS TO DRY DRIFT UP AND DOWN CLEAN. 04:20 - 04:40 0.33 STWHIP P WEXIT FLOW CHECK.NO FLOW. OPEN EDC. 04:40 - 06:25 1.75 STWHIP P WEXIT POOH 100 FPM. PUMPING AT MAX RATE 3.5 BPM AT 2,810 PSI. 06:25 - 06:50 0.42 STWHIP P WEXIT '00H FLOW CHECK WELL AND HOLD PJSM TO LD WINDOW MILLING BHA 06:50 - 07:35 0.75 STWHIP P WEXIT LD DRILLING BHA BOTH MILLS IN GAUGE,3.80"GO 3.79"NO-GO 07:35 - 07:50 0.25 STWHIP P WEXIT PREP TO CUT COIL AND BACK FLUSH OUT MICRO-MOTION 07:50 - 08:05 0.25 STWHIP P WEXIT PJSM FOR PERFORMING CHROME MANAGEMENT,CUT-100'OF COIL 08:05 - 08:25 0.33 STWHIP P WEXIT REMOVE BHI UQC CUT CTC OFF AND SEAL WIRE E 08:25 - 08:45 0.33 STWHIP P WEXIT CUT-100'OF COIL 08:45 - 09:30 0.75 STWHIP P WEXIT CUT 100', DRESS COIL FOR CTC MU CTC PULL TEST CTC 30K,GOOD PULL TEST 09:30 - 10:40 1.17 STWHIP P WEXIT MU BHI UQC TEST UQC WIRE 10:40 - 10:45 0.08 STWHIP P WEXIT PRESSURE TEST UQC to 250 and 2500 PSI 10:40 2760 PSI 10:45 2754 PSI GOOD TEST 10:45 - 11:00 0.25 DRILL P PROD1 PJSM TO MU DRILLING BHA 11:00 - 12:00 1.00 DRILL P PROD1 MU THE DRILLING BHA 12:00 - 12:30 0.50 DRILL P PROD1 RIH WITH DRILLING BHA 12:30 - 13:10 0.67 DRILL P PROD1 STOP TO ADD A LINK TO THE CHAIN BINDERS THAT SECURE THE INJECTOR FROM SWAYING.THE HEIGHT OF THE INJECTOR HAS CHANGED THE ANGLE OF THE CABLE AND IS PULLING ON THE SUPPORT THAT HOLDS THE CHAIN BINDER 13:10 - 14:20 1.17 DRILL P PROD1 CONTINUE RIH 14:20 - 14:40 0.33 DRILL P PROD1 TIE IN STARTING AT 9935' 14:40 - 14:50 0.17 DRILL P PROD1 CORRECT DEPTH-19'AND RIH 14:50 - 16:50 2.00 DRILL P PROD1 ON BOTTOM DRILLING AT 10074' 2.86 IN 2.94 OUT PVT=334 BBLS WI-VIA/OA/00A=48/126/67/221 PSI WOB= 1.5K TO 3.7K ECD=9.77 PPG 16:50 - 17:55 1.08 DRILL P PROD1 DRILLED 4' IN 2 HRS WITH 10 STALLS.VERY DIFFICULT TO GET A PATTERN STARTED 2.75 IN 2.82 OUT PVT=333 BBLS WH/IA/OA/00A=51/128/20/216 PSI WOB=2.8K TO 4.3K ECD=9.77 PPG Printed 5/25/2011 3:54:37PM North America -ALASKA- BP Page 11 of 38 Operation Summary Report Common Well Name:06-02 AFE No Event Type: RE-ENTER-ONSHORE(RON) Start Date:4/9/2011 End Date: 5/2/2011 X3-00YL3-C(2,537,875.00) Project:Prudhoe Bay Site: PB DS 06 Rig Name/No.: NORDIC 1 Spud Date/Time:5/1/1978 12:00:00AM Rig Release:5/7/2011 Rig Contractor: NORDIC CALISTA UWI:500292028200 Active Datum:2: 02 5/1/1978 00:00 @64.00ft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (ft) 17:55 - 18:45 0.83 DRILL P PROD1 10082.5'DRILLING GETTING BETTER THEN STALLED AT 10083.8' 18:45 - 19:00 0.25 DRILL P PROD1 SPR#1 PUMP:2.85 BPM @ 2830 PSI,1.4 BPM @ 1600 PSI,0.9 BPM @ 1326 PSI. SPR#2 PUMP:2.85 BPM @ 2820 PSI,1.4 BPM @1640PSI,0.9BPM @1329PSI. 19:00 - 20:30 1.50 DRILL P PROD1 DRILLING AHEAD AT 10,088'. PUMPING 2.82 BBL IN 2.92 BBL OUT AT 2,915 PSI, FS 2,842 PSI WOB=0.8K, ECD=9.82 PPG,PVT 331 BBLS 20:30 - 21:00 0.50 DRILL P PROD1 TRIED TO INCREASE ROP, BUT THE TOOL FACE WAS ALL OVER AND HAD TO SLOW BACK DOWN.STALLED AT 26 FPH WHEN DHWOB JUMPED TO 3K AT A CIRC PRESSURE OF 2,992 PSI. 21:00 - 23:00 2.00 DRILL P PROD1 DRILLING AHEAD AT 10,100'. PUMPING 2.82 BBL IN 2.92 BBL OUT AT 2,915 PSI,FS 2,842 PSI WOB=0.8K, ECD=9.84 PPG, PVT 329 BBLS 23:00 - 00:00 1.00 DRILL P PROD1 DRILLING AHEAD AT 10,122'. PUMPING 2.94 BBL IN 3.02 BBL OUT AT 3,098 PSI, FS 2,950 PSI WOB=0.8K, ECD=9.86 PPG,PVT 327 BBLS 4/17/2011 00:00 - 01:15 1.25 DRILL P PROD1 DRILLING AHEAD AT 10,133'. PUMPING 2.94 BBL IN 3.02 BBL OUT AT 3,098 PSI, FS 2,950 PSI WOB=0.8K, ECD=9.87 PPG,PVT 329 BBLS 01:15 - 02:30 1.25 DRILL P PROD1 DRILLING AHEAD AT 10.143'. PUMPING 2.94 BBL IN 3.02 BBL OUT AT 3,098 PSI, FS 2,950 PSI WOB=0.5K, ECD=9.88 PPG,PVT 327 BBLS 02:30 - 03:15 0.75 DRILL P PROD1 TRIED TO INCREASE ROP TO 25 FPH,BUT • CIRCULATING PRESURES JUMPED ALL OVER BETWEEN 2,900 PSI AND 3,430 PSI.TOOL FACE WAS ALSO ALL OVER AND HAD TO SLOW BACK DOWN. 03:15 - 03:55 0.67 DRILL P PROD1 DRILLING AHEAD AT 10,161'. PUMPING 2.94 BBL IN 3.02 BBL OUT AT 3,098 PSI, FS 2,950 PSI WOB=0.5K, ECD=9.88 PPG,PVT 325 BBLS 04:00 - 04:45 0.75 DRILL P PROD1 DRILLING AHEAD AT 10,169'. PUMPING 2.94 BBL IN 3.00 BBL OUT AT 3,098 PSI, FS 2,950 PSI WOB= 1.0K, ECD=9.90 PPG,PVT 326 BBLS 04:45 - 05:00 0.25 DRILL P PROD1 WIPER TRIP UP TO 10,080'. 05:00 - 06:20 1.33 DRILL P PROD1 DRILLING AHEAD AT 10,175'. PUMPING 2.64 BBL IN 2.70 BBL OUT AT 2,684 PSI, FS 2,580 PSI WOB=.56K, ECD=9.83 PPG,PVT 326 BBLS 06:20 - 06:35 0.25 DRILL P PROD1 WIPER TRIP UP TO 10,080'. 06:35 - 07:25 0.83 DRILL P PROD1 DRILLING AHEAD AT 10,188'. PUMPING 2.67 BBL IN 2.74 BBL OUT AT 2,787 PSI, FS 2,787 PSI WOB=2K, ECD=9.83 PPG,PVT 324 BBLS 07:25 - 08:05 0.67 DRILL P PROD1 BLEED OOA DOWN FROM 260 PSI TO 150 PSI Printed 5/25/2011 3:54:37PM North America-ALASKA- BP Page 12 of 38 Operation Summary Report Common Well Name:06-02 AFE No Event Type: RE-ENTER-ONSHORE(RON) Start Date:4/9/2011 End Date: 5/2/2011 X3-00YL3-C(2,537,875.00) Project:Prudhoe Bay Site: PB DS 06 Rig Name/No.: NORDIC 1 Spud Date/Time: 5/1/1978 12:00:00AM Rig Release: 5/7/2011 Rig Contractor: NORDIC CALISTA UWI: 500292028200 Active Datum:2:02 5/1/1978 00:00 @64.00ft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (ft) 08:05 - 08:20 0.25 DRILL P PROD1 CALLED ODE TO DISCUSS POOH TO INSPECT BIT, ONLY ABLE TO PUT<1K WOB AT.WE ARE NOT MAKING HOLE LIKE WE SHOULD IN ZONE 4,SAMPLES ARE ALL SAND, MOTOR STALLS ARE STRONG AT 8-900 PSI AND WE HAVE DEPARTURE FROM THE PARENT WELL. 08:20 - 10:00 1.67 DRILL P PROD1 POOH TO INSPECT BIT PVT=323 BBLS 10:00 - 11:00 1.00 DRILL P PROD1 OOH,FLOW CHECK WELL&PJSM TO LD BHA NO FLOW,LD DRILLING BHA TO INSPECT BIT BIT LOOKS FINE, LD HI-FLOW LOW SPEED MOTOR FOR STANDARD XTREME MOTOR 11:00 - 11:15 0.25 DRILL P PROD1 FUNCTION TEST BOP RAMS 11:15 - 11:30 0.25 DRILL P PROD1 BIT LOOKS FINE, LD HI-FLOW LOW SPEED MOTOR FOR STANDARD XTREME MOTOR. PJSM TO MU DRILLING BHA 11:30 - 12:00 0.50 DRILL P PROD1 MU DRILLING BHA 12:00 - 13:55 1.92 DRILL P PROD1 TEST MWD AND RIH PVT=275 BBLS 13:55 - 14:20 0.42 DRILL P PROD1 TIE IN 14:20 - 14:25 0.08 DRILL P PROD1 CORRECT DEPTH-21', RIH TO TD 14:25 - 14:30 0.08 DRILL P PROD1 SPR#1 PUMP:2.85 BPM @ 2800 PSI,1.4 BPM @1615PS1,0.3BPM@1135PS1 14:30 - 15:15 0.75 DRILL P PROD1 START DRILLING AT 10201' FREE SPIN 2650 PSI 2.52 IN 2.6 OUT ROP=30 FPH PVT=322 BBLS WH/IA/OA/00A=48/177/52/205 PSI WOB=0.7K TO 1.1K ECD=9.86 PPG 15:15 - 17:45 2.50 DRILL P PROD1 DRILLING AHEAD FREE SPIN 2750 PSI 2.61 IN 2.70 OUT ROP=25-30 FPH PVT=320 BBLS WI-VIA/OA/00A=48/362/54/205 PSI WOB=<1K ECD=9.86 PPG 17:45 - 18:15 0.50 DRILL P PROD1 DRILLING AHEAD FREE SPIN 2750 PSI 2.61 IN 2.70 OUT ROP=20-30 FPH PVT=318 BBLS WI-VIA/OA/00A=48/402/57/209 PSI WOB=<1K ECD=9.92 PPG 18:15 - 18:45 0.50 DRILL P PROD1 DRILLING AHEAD FREE SPIN 2700 PSI 2.61 IN 2.70 OUT ROP=40-50 FPH PVT=316 BBLS WH/IA/OA/00A=44/408/57/212 PSI WOB= 1.1K ECD=9.91 PPG 18:45 - 19:45 1.00 DRILL P PROD1 DRILLING AHEAD FREE SPIN 2728 PSI 2.62 IN 2.70 OUT ROP=50-60 FPH PVT=314 BBLS WHJIA/OA/OOA=48/433/57/212 PSI WOB=1.6K ECD=9.91 PPG 19:45 - 20:25 0.67 DRILL P PROD1 WIPER TRIP 10,350'TO WINDOW PU WT 35K PUMPING 0.3 BBL 20:25 - 21:30 1.08 DRILL P PROD1 TIE IN LOG FROM 9925'TO 9976'. CORRECTION+3' TIH. LOG RA TAG. (CHANGE CORRECTED RA TAG DEPTH FROM 10,062.5 TO 10,064') Printed 5/25/2011 3:54:37PM North America-ALASKA- BP Page 13 of 38 Uperation Summary Report Common Well Name:06-02 AFE No Event Type: RE-ENTER-ONSHORE(RON) Start Date:4/9/2011 End Date:5/2/2011 X3-00YL3-C(2,537,875.00) Project: Prudhoe Bay Site: PB DS 06 Rig Name/No.: NORDIC 1 Spud Date/Time:5/1/1978 12:00:00AM Rig Release:5/7/2011 Rig Contractor: NORDIC CALISTA UWI: 500292028200 Active Datum:2: 02 5/1/1978 00:00 @64.00ft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (ft) 21:30 - 21:50 0.33 DRILL P PROD1 DRILLING AHEAD FREE SPIN 2736 PSI 2.50 IN 2.55 OUT ROP=50-60 FPH PVT=303 BBLS WH/IA/OA/00A=40/468/61/209 PSI WOB=1.5K ECD=9.91 PPG 21:50 - 22:00 0.17 DRILL P PROD1 BHA WIPER 22:00 - 00:00 2.00 DRILL P PROD1 LOST 3 BBLS OF MUD IN 5 MINUTES THEN IT HEALED UP. HARD STALL AT 10,363'.DRILLING AHEAD. FREE SPIN 2736 PSI 2.50 IN 2.55 OUT ROP=50-60 FPH PVT=299 BBLS WI-VIA/OA/00A=40/468/61/209 PSI WOB=1.5K ECD=9.91 PPG 4/18/2011 00:00 - 02:30 2.50 DRILL P PROD1 DRILLING AHEAD AT 10,413' FREE SPIN 2670 PSI 2.50 IN 2.55 OUT ROP=50-60 FPH PVT=296 BBLS WH/IA/OA/O0A=55/608/66/212 PSI WOB=2.5K ECD=9.96 PPG 02:30 - 03:00 0.50 DRILL P PROD1 WIPER TO WINDOW. PVT 291 BBLS 03:00 - 04:20 1.33 DRILL P PROD1 DRILLING AHEAD AT 10.500' FREE SPIN 2650 PSI 2.50 IN 2.55 OUT ROP=50-60 FPH PVT=289 BBLS WH/IA/0A/00A=55/608/66/212 PSI WOB=1K ECD=9.96 PPG 04:20 - 04:30 0.17 DRILL P PROD1 BHA WIPER. UP WT 37K, DN WT 15K 04:30 - 05:05 0.58 DRILL P PROD1 DRILLING AHEAD AT 10,600' FREE SPIN 2650 PSI 2.50 IN 2.55 OUT ROP=60-70 FPH PVT=286 BBLS WH/IA/OA/00A=55/608/66/212 PSI WOB=2K ECD=10.06 PPG 05:05 - 05:10 0.08 DRILL P PROD1 BHA WIPER FOR 80'. UP WT 37.5K DW WT 15K 05:10 - 05:30 0.33 DRILL P PROD1 DRILL TO 10,650' 05:30 - 06:20 0.83 DRILL P PROD1 WIPER TO WINDOW. PVT 281 BBLS 06:20 - 08:45 2.42 DRILL P PROD1 BACK ON BOTTOM DRILLING FREE SPIN 2650 PSI 2.62 IN 2.80 OUT ROP=90-110 FPH PVT=278 BBLS WI-VIA/OA/00A=73/654/67/289 PSI WOB=22-4K ECD=10.09 PPG 08:45 - 10:30 1.75 DRILL P PROD1 DRILLING IN THE 22N SHALE, NOT MAKING MUCH HOLE SINCE GETTING BACK TO BOTTOM AFTER SHORT TRIP.GEO SAYS WE HAVE ABOUT 70'OF THIS TO DRILL BEFORE DRILLING INTO ZONE 2 SLOW PUMP RATES&PRESSURES SPR#1 PUMP:2.6 BPM @ 2980 PSI,1.32 BPM @ 1840 PSI,0.32 BPM©1040 PSI SPR#2 PUMP:2.6 BPM @ 3250 PSI,1.3 BPM @ 1720 PSI,0.3 BPM @ 1180 PSI 10:30 - 12:00 1.50 DRILL P PROD1 FREE SPIN 2950 PSI 2.62 IN 2.70 OUT ROP= 10 FPH PVT=272 BBLS WH/IA/OA/00A=59/718/70/352 PSI WOB=3-4K ECD= 10.06 PPG BLEED IA&OOA PRESSURES DOWN Printed 5/25/2011 3:54:37PM North America-ALASKA- BP Page 14 of 38 Operation Summary Report Common Well Name:06-02 AFE No Event Type: RE-ENTER-ONSHORE(RON) Start Date:4/9/2011 End Date:5/2/2011 X3-00YL3-C(2,537,875.00) Project:Prudhoe Bay Site: PB DS 06 Rig Name/No.: NORDIC 1 Spud Date/Time:5/1/1978 12:00:00AM Rig Release: 5/7/2011 Rig Contractor:NORDIC CALISTA UWI: 500292028200 Active Datum:2:02 5/1/1978 00:00 @64.00ft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (ft) 12:00 - 12:25 0.42 DRILL P PROD1 FREE SPIN 2950 PSI 2.67 IN 2.75 OUT ROP=5-10 FPH PVT=271 BBLS WI-VIA/OA/00A=62/126/62/359 PSI WOB=3-4K ECD=10.06 PPG 12:25 - 15:35 3.17 DRILL P PROD1 STACKING WT PUH FOR BHA WIPER TO SEE IF WE CAN GET BETTER WT TRANSFER 15:35 - 17:20 1.75 DRILL P PROD1 ROP INCREASE LOOKS LIKE WE ARE THROUGH THE 22N SHALE FREE SPIN 300 PSI 2.63 IN 2.69 OUT ROP=50-100 FPH PVT=264 BBLS WH/IA/OA/00A=44/165/67/150 PSI WOB=2-4K ECD=10.08 PPG 17:20 - 17:50 0.50 DRILL P PROD1 WIPER TO THE WINDOW FROM 10,800'. 2.5 BPM, FS 2809PSI. 17:50 - 18:05 0.25 DRILL P PROD1 TIE IN AT 10085' CORRECTION+4' 18:05 - 18:45 0.67 DRILL P PROD1 RIH 18:45 - 21:40 2.92 DRILL P PROD1 DRILLING AHEAD FROM 10800' FS 2974 PSI,2.6 BPM AT 3241 PSI,DWOB 2.3K , ROP 78 FPH UP WT 37K, DN WT 12K, PVT 261 BBLS 21:40 - 22:35 0.92 DRILL P PROD1 WIPER TO THE WINDOW FROM 10,950'. 2.7 BPM, FS 3127PS1. 22:35 - 23:15 0.67 DRILL P PROD1 OPEN EDC AND JET PILOT HOLE AND WHIPSTOCK TRAY CLEAN. 2.7BPM AT 2395 PSI. 23:15 - 23:50 0.58 DRILL P PROD1 CLOSE EDC AND RIH. 2.45 BPM, FS 2776PSI. 23:50 - 00:00 0.17 DRILL P PROD1 DRILLING AHEAD FROM 10950'. FS 2908 PSI,2.54 BPM AT 3325 PSI,DWOB 2.5K, ROP 67 FPH UP WT 37K,DN WT 12K,PVT 254 BBLS WI-VIA/OA/00A=33/190/67/190 PSI ECD= 10.16 PPG 4/19/2011 06:50 - 07:20 0.50 DRILL P PROD1 CORRECT DEPTH+6', POOH TO 9700'TO MAKE SURE PILOT HOLE IS CLEAN PULLED HEAVY AT 10020'AND PACKED OFF, RIH AND GOT FREE.CONTINUE WORKING UP TO 4.5 TUBING PULLED HEAVY AGAIN 10,007 RIH PULLED HEAVY AT 9995'RIH PULED HEAVY AT 9993'RIH PULLED HEAVY AT 9930RIH 09:45 - 10:15 0.50 DRILL N WAIT 11,250.00 PROD1 NORDIC'S FLUID MAMAGEMENT POLICY IS NOT VERY CLEAR AS TO WHETHER OR NOT WE CAN CONTINUE DRILLING WHILE SWAPPING TO NEW MUD.WAIT FOR NORDIC SUPERINTENDENT TO GET TO LOCATION TO SEE IF WE CAN CONTINUE DRILLING WHILE SWAPPING MUD OR DO WE HAVE TO STOP. 00:00 - 02:15 2.25 DRILL P PROD1 DRILLING AHEAD FROM 10950'. FS 2897 PSI,2.5 BPM AT 3325 PSI,DWOB 2.5K , ROP 67 FPH ECD=10.20 PPG 02:15 - 03:15 1.00 DRILL P PROD1 SHORT TRIP AT 11,100'. UP WT 40K,2.5 BPM Printed 5/25/2011 3:54:37PM North America-ALASKA- BP Page 15 of 38 liperation Summary Report Common Well Name:06-02 AFE No Event Type: RE-ENTER-ONSHORE(RON) Start Date:4/9/2011 End Date:5/2/2011 X3-00YL3-C(2,537,875.00) Project:Prudhoe Bay Site: PB DS 06 Rig Name/No.: NORDIC 1 Spud Date/Time:5/1/1978 12:00:00AM Rig Release: 5/7/2011 Rig Contractor: NORDIC CALISTA UWI:500292028200 Active Datum:2: 02 5/1/1978 00:00 @64.00ft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (ft) 03:15 - 04:20 1.08 DRILL P PROD1 DRILLING AHEAD FROM 11,100'. FS 3050 PSI,2.65 BPM AT 3325 PSI,DWOB 2.5K, ROP 67 FPH UP WT 37K, DN WT 12K,PVT 233 BBLS WH/IA/0A/00A=33/253/67/198 PSI ECD=10.20 PPG 04:20 - 05:50 1.50 DRILL P PROD1 DRILLING AHEAD FROM 11,187'. FS 3050 PSI,2.65 BPM AT 3325 PSI,DWOB 2.5K, ROP 67 FPH UP WT 37K, DN WT 12K,PVT 213 BBLS WH/IA/OA/00A=33/253/67/198 PSI ECD=10.20 PPG LOSING 24 BPH 05:50 - 06:35 0.75 DRILL P PROD1 WIPER TO THE WINDOW FROM 11,250' 2.5 BPM, LOSING 20 BPH SPR#1 PUMP:2.6 BPM @ 2974 PSI,1.32 BPM @ 1816 PSI,0.32 BPM @ 1428 PSI SPR#2 PUMP:2.6 BPM @ 2977 PSI,1.3 BPM @ 1816 PSI,0.3 BPM @ 1425 PSI 06:35 - 06:50 0.25 DRILL P PROD1 TIE IN TO RA CORRECT DEPTH+6' 07:20 - 07:30 0.17 DRILL P PROD1 PULLED UP TO 9600'RIH TO OPEN EDC 07:30 - 07:35 0.08 DRILL P PROD1 OPEN EDC TO JET THE PILOT HOLE AND TUBING CLEAN 07:35 - 07:50 0.25 DRILL P PROD1 PUH JETTING PILOT HOLE AND TUBING CLEAN 07:50 - 08:35 0.75 DRILL P PROD1 POOH CIRCULATING BU BOTTOMS UP HAD A LITTLE MORE THAN NORMAL CUTTING AND A PIECE OF RUBBER THAT DID NOT LOOK LIKE STATOR RUBBER RIH TO WINDOW,CLOSE EDC AND RIH TO TD 08:35 - 09:25 0.83 DRILL P PROD1 CLOSE EDC AND RIH TO TD 09:25 - 09:45 0.33 DRILL P PROD1 TAG TD 11254',SWAP TO NEW MUD DRILLING AHEAD FROM 11,254'. FS 3160 PSI,2.61 BPM AT 3560 PSI,DWOB 2.1K ROP 67 FPH PVT 213 BBLS WH/IA/OA/00A=43/0/68/183 PSI ECD= 10.21 PPG LOSING 18 BPH 10:15 - 12:00 1.75 DRILL P PROD1 OK TO CONTINUE DRILLING. WE CAN CONTINUE DRILLING AS LONG AS WE KEEP THE RETURNS ON THE RIG AND STOP TO OFF LOAD THE PIT WHEN IT IS FULL OR SWAP TO ANOTHER PIT FOR RETURNS 12:00 - 13:25 1.42 DRILL P PROD1 SHORT TRIP TO WINDOW PVT=311, LOSSES HAVE INCREASED TO 0.5-0.6 BPM CALL ODE TO GET APPROVAL FROM WTL TO CONTINUE DRILLING AHEAD FLUIDS=310 BBLS OF NEW MUD IN THE PITS, 290 BBLS USED MUD ON LOCATION IN VAC TRUCK,290 BBLS OF NEW MUD BEING LOADED AT THE MUD PLANT Printed 5/25/2011 3:54:37PM North America -ALASKA- BP Page 16 of 38 C,peration Summary Report Common Well Name:06-02 AFE No Event Type: RE-ENTER-ONSHORE(RON) Start Date:4/9/2011 End Date:5/2/2011 X3-00YL3-C(2,537,875.00) Project:Prudhoe Bay Site: PB DS 06 Rig Name/No.: NORDIC 1 Spud Date/Time: 5/1/1978 12:00:00AM Rig Release: 5/7/2011 Rig Contractor: NORDIC CALISTA UWI:500292028200 Active Datum:2:02 5/1/197800:00 @64.00ft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (ft) 13:25 - 13:55 0.50 DRILL P PROD1 PULLING HEAVY AT SAME DPTHS AS THIS MORNING 10005', CAL ODE AND ETL TO DISCUSS BEING ABLE TO OPEN THE EDC WITH THE BIT OUTSIDE THE WINDOW TO CLEAR PILOT HOLE WITH HIGHER RATE THAN 0.5 BPM.GOT THE APPROVAL RIH AND OPEN EDC 20'BELOW THE BOTTOM OF THE WINDOW WHICH PUTS THE EDC 20'BELOW WHERE THE BIT IS STALLING AT 10007' 13:55 - 15:00 1.08 DRILL N WAIT PROD1 10084'OPEN EDC AND PUMP AT 2.6 BPM PVT=257 BBLS LOST 54 BBLS DURING TRIP PULLED PAST DEPTH WHERE THE BIT WAS STALLING CLEAN,CONTINUE POOH TO 9600' AND CIRC A BOTTOMS UP, MOTORMAN NEEDS TO PREFORM MAINTENANCE ON ONE OF THE GENERATORS WHILE WO WTL APPROVAL TO CONTINUE DRILLING AHEAD WITH>0.5 BPM LOSSES 15:00 - 17:00 2.00 DRILL N WAIT 9,700.00 PROD1 WHILE WO WTL APPROVAL TO CONTINUE DRILLING AHEAD WITH>0.5 BPM LOSSES 17:00 - 18:10 1.17 DRILL P PROD1 JUST RECEIVED APPROVAL TO CONTINUE DRILLING OPS CLOSE EDC AND RIH PVT=213 BBLS 18:10 - 23:00 4.83 DRILL P PROD1 BACK ON BOTTOM. PUW 39K. DRILL AHEAD FROM 11,400'TO 11,464'. FS 2950 PSI,2.60 BPM AT 2945-3190 PSI, DWOB 3.82-4.36K ROP 8.4-15 FPH PVT 289 BBLS(TOOK ON 150 BBLS WHILE DRILLING AHEAD) WI-VIA/OA/00A=51/17/70/100 PSI ECD=9.9-10.0 PPG INITIAL LOSSES 36 BPH, END LOSSES AT 18-20 BPH • -DECREASE IN ROP,MWD TOOLS HOURED OUT,CONCERN WITH ABILITY TO CONTINUE WITH 12/100 BUILD;CONTACT ENGINEER TO PROVIDE RECOMMENDATION -CONDUCT FIRE DRILL,CRT 1 MIN 30 SEC 23:00 - 00:00 1.00 DRILL P PROD1 WIPER TRIP TO WINDOW WITH LOSSES AT.3 BPM. PUW 39K. OPEN EDC, INCREASE PUMPS TO 3.3 BPM TO POH TO SURFACE FOR BIT AND MOTOR CHANGE,CHANGE OUT MWD TOOLS. 4/20/2011 00:00 - 02:40 2.67 DRILL P PROD1 POH TO SURFACE FOR BIT AND MOTOR CHANGE,CHANGE OUT MWD TOOLS. CONDUCT PJSM ON HANDLING BHA,WELL CONTROL. TAG,JOG BACK DOWN TO 500'. CLOSED EDC. FLOW CHECK WELL. POH TO SURFACE. TOTAL LOSS TO WELL ON WIPER AND POH 35 BBLS. 02:40 - 03:30 0.83 DRILL P PROD1 BREAK OUT, LD BHA. BIT SEVERELY RUNG OUT. -BIT GRADE:6-4-RO-N-X-I-VVT-PR -MU 3.75"DRILLING BHA:3.75"BIT,2 7/8" 1.5 DEG MOTOR, HOT, USMPR, DGS, DPS, EDC, POWERCOMMS,WEAR SUB, LQC, UQC, CROSSOVER,COIL CONNECTOR -FILL ACROSS THE TOP WHILE WORKING WITH BHA. TOOK 5 BBLS TO FILL HOLE INITIALLY. Printed 5/25/2011 3:54:37PM North America -ALASKA- BP Page 17 of 38 ( peration Summary Report Common Well Name:06-02 AFE No Event Type: RE-ENTER-ONSHORE(RON) Start Date:4/9/2011 End Date: 5/2/2011 X3-00YL3-C(2,537,875.00) Project: Prudhoe Bay Site: PB DS 06 Rig Name/No.: NORDIC 1 Spud Date/Time: 5/1/1978 12:00:00AM Rig Release:5/7/2011 Rig Contractor: NORDIC CALISTA UWI: 500292028200 Active Datum:2: 02 5/1/1978 00:00 @64.00ft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (ft) 03:30 - 03:45 0.25 DRILL P PROD1 PVT 204,MANUAL STRAP 194. PJSM ON MAKING UP INJECTOR TO LUBRICATOR. CHANGE OUT PACKOFFS. PUMPS ON, ONE-FOR-ONE RETURNS AT.6 BPM. RIH. SHALLOW HOLE TEST MWD,GOOD TEST. 03:45 - 06:00 2.25 DRILL P PROD1 RIH WITH DRILLING BHA. CONDUCT AAR ON BHA LD AND MU WHILE RIH. FLUID LOSS CALCULATED AT.06 BPM LOSS(4 BPH) WHILE RIH. CONDUCT TIE-IN WITH RA TAG AT 10,080'. -19.5'CORRECTION. 06:00 - 07:10 1.17 DRILL P PROD1 DRILLING AHEAD FROM 11,467'WITH A GAUGE BIT 3.75" FS 2860 PSI,2.7 BPM AT 3000 PSI,DWOB 3.91K ROP 57 FPH PVT 232 BBLS WI-VIA/OA/00A=33/6/71/311 PSI ECD=9.96 PPG LOSING 18-20 BPH SPR#1 PUMP:2.6 BPM @ 2778 PSI,1.32 BPM @ 1721 PSI,0.32 BPM @ 1245 PSI SPR#2 PUMP:2.6 BPM @ 2776 PSI,1.3 BPM @ 1740 PSI,0.3 BPM @ 1230 PSI 07:55 - 08:00 0.08 DRILL P PROD1 WT CK 36K, RIH WT 14K 08:00 - 09:40 1.67 DRILL P PROD1 CONTINUE DRILLING 08:50 WT CK 36K,RIH WT 14K 09:40 - 11:00 1.33 DRILL P PROD1 SHORT TRIP TO THE WINDOW 36K UP WT PVT=212 BBLS 10080'RIH PVT= 194 BBLS 11:00 - 11:20 0.33 DRILL P PROD1 STOPPED OPERATIONS TO DISCUSS THE INCIDENT THAT HAPPENED ON THE DEEP WATER HORIZON AND FOR A MOMENTOF SILENCE 11:20 - 11:50 0.50 DRILL P PROD1 CONTINUE WIPER BACK TO TD 10700'OUT MM PLUGGING OFF, PU SLOW -7 UNTIL LINE IS CLEARED. 51.hL 11:50 - 12:35 0.75 DRILL P PROD1 DRILLING AHEAD FROM 1 l 60 'te' -OST 18 BBLS DURING SHORT TRIP FS 3230 PSI,3.0 BPM AT 3580 PSI,DWOB 2.55K ROP 35 FPH PVT=189 BBLS WI-VIA/OA/00A=33/85/77/315 PSI ECD= 10.02 PPG LOSING 9-10 BPH 12:35 - 13:30 0.92 DRILL P PROD1 DRILLING AHEAD FROM 11,645' FS 3230 PSI,3.0 BPM AT 3515 PSI,DWOB 3.5K ROP 50 FPH PVT=271 BBLS WH/IA/0A/00A=29/100/74/320 PSI ECD= 10.02 PPG LOSING 8-10 BPH 12:50 11650'WT CK 36K, RIH WT 14K 13:30 - 13:45 0.25 DRILL P PROD1 DRILLING AHEAD FROM 11,700' FS 3225 PSI,3.0 BPM AT 3400 PSI,DWOB 2.6K ROP 100 FPH PVT=262 BBLS WI-VIA/OA/00A=26/110/73/326 PSI ECD= 10.02 PPG LOSING 8-10 BPH 13:30 WT CK 36K, RIH WT 14K 13:45 - 14:10 0.42 DRILL P PROD1 PUMP 15 BBL HI-VIS SWEEP TO CLEAN HOLE BEFORE SHORT TRIP 11740 HI VIS PILL OUT Printed 5/25/2011 3:54:37PM North America -ALASKA- BP Page 18 of 38 VNeration Summary Report Common Well Name:06-02 AFE No Event Type: RE-ENTER-ONSHORE(RON) Start Date:4/9/2011 End Date: 5/2/2011 X3-00YL3-C(2,537,875.00) Project: Prudhoe Bay Site: PB DS 06 Rig Name/No.: NORDIC 1 Spud Date/Time:5/1/1978 12:00:00AM Rig Release:5/7/2011 Rig Contractor: NORDIC CALISTA UWI:500292028200 Active Datum:2:02 5/1/1978 00:00 @64.00ft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (ft) 14:10 - 14:50 0.67 DRILL P PROD1 SHORT TRIP TO WINDOW PU WT 37K PVT= 256 BBLS 14:50 - 15:25 0.58 DRILL P PROD1 HI-VIS PILL BROUGHT UP A LOT OF SAND AND CLAY, PUMP ANOTHER PILL 20 BBLS PILL 15:25 - 15:35 0.17 DRILL P PROD1 AT THE WINDOW,JOG BACK IN HOLE 100' MM PLUGGING OFF, BACK FLUSH TO CLEAR 15:35 - 16:50 1.25 DRILL P PROD1 PULLED THROUGH WINDOW TO 9950', RIH TO WINDOW AND OPEN EDC EDC OPEN, POOH JETTING PILOT HOLE AND TUBING 2ND PILL STILL BRINGING UP LOTS OF SAND AND CLAY 16:50 - 17:55 1.08 DRILL P PROD1 CLOSE EDC AND RIH 17:55 - 20:45 2.83 DRILL P PROD1 DRILLING AHEAD FROM 11,750'TO 11,900' FS 3280-3360 PSI,3.0 BPM AT 3505-3765 PSI, DWOB 2.6-4.16K ROP 100 FPH PVT=218 BBLS WH/IA/OA/00A=26/159/76/319 PSI MW IN 8.55,MW OUT 8.62, ECD=10.02 PPG LOSING 8-10 BPH PUW 38K,SOW 11K AT 11,797';SLOW PUMP RATES TAKEN, KILL SHEET UPDATED PUW 38K,SOW 11K AT 11,847' PUMP 10 BBL HI-VIS SWEEP TO TIME WITH END OF THIS DRILLING RUN. DRILL TO 11,910'; PILL AT BIT. PUW 38K,SOW 11K. WH/IA/OA/00A=73/268/79/110 PSI AT END OF DRILLING TO 11,910' 20:45 - 22:00 1.25 DRILL P PROD1 WIPER TRIP TO WINDOW CHASING HI-VIS PILL OUT OF HOLE AT 3 BPM,3360-3390 PSI, 25 FPM. 30%INCREASE OF RETURNS ACROSS SHAKERS,PRIMARILY SAND WITH SOME FINE CUT SHALE AND CLAY BALLS. MAINTAINED 8-10 BPH LOSSES ON WIPER TRIP. 22:00 - 23:50 1.83 DRILL P PROD1 CONDUCT TIE-IN TO RA TAG. +9' CORRECTION. CONTINUE TO RIH AT 33 FPM TO 11,235'. LOG UP FROM 11,235'TO 11,185' TO CONDUCT MULTIPLE CHECK SHOTS FOR MWD/GEO LOGGING PURPOSES. RIH TO TO. 23:50 - 00:00 0.17 DRILL P PROD1 TAG TD. DRILL AHEAD TO 11,930'AT 3.04 BPM,3745 PSI ON,8.5 PPG MW IN,8.64 PPG MW OUT 4/21/2011 00:00 - 02:10 2.17 DRILL P PROD1 DRILL AHEAD FROM 11 930'TO 11 981' PUW 38K,SOW 11K FS 3380 PSI,2.93-3.04 BPM AT 3570-3745 PSI, DWOB 3.62-3.73K ROP 18-68 FPH, PVT BEGIN 320, END 296 BBLS, MW IN 8.54, MW OUT 8.64 WH/IA/0A/00A=44/165/77/125 PSI MW IN 8.55, MW OUT 8.62, ECD INCREASED FROM 10.0-10.2 PPG LOSING 8-10 BPH DRILLED AHEAD SUCCESSFULLY TO 11,980'; NO LONGER SEEING MOTOR WORK AT 11,981' INCLINATION AT 11,981'IS 100 DEG Printed 5/25/2011 3:54:37PM North America-ALASKA- BP Page 19 of 38 Uperation Summary Report Common Well Name:06-02 AFE No Event Type: RE-ENTER-ONSHORE(RON) Start Date:4/9/2011 End Date: 5/2/2011 X3-00YL3-C(2,537,875.00) Project: Prudhoe Bay Site: PB DS 06 Rig Name/No.: NORDIC 1 Spud Date/Time:5/1/1978 12:00:00AM Rig Release: 5/7/2011 Rig Contractor: NORDIC CALISTA UWI:500292028200 Active Datum:2: 02 5/1/1978 00:00 @64.00ft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (ft) 02:10 - 04:15 2.08 DRILL P PROD1 WORK COIL THROUGH SECTION SEVERAL TIMES TO DISTURB AND MOVE CUTTINGS UP HOLE. SHAKERS SHOW SAND,SOME SHALES WITH MIX OF CLAY. PUMP 10 BBL HI-VIS SWEEP TO CLEAN HOLE WHILE WORKING SECTION. CHASE SWEEP OUT OF HOLE AT 2.9 BPM,3430 PSI. SWEEP INCREASED CUTTINGS SIGNIFICANTLY ACROSS SHAKERS,HEAVY SAND WITH CLAY AND SHALE MIX. CONTINUE WIPING UP HOLE TO WINDOW. 04:15 - 05:00 0.75 DRILL P PROD1 OPEN EDC AT WINDOW. WORK OUT OF WINDOW AND BACK THROUGH TO 9700'AT 2.9 BPM,2700 PSI. BOTTOMS UP HAD 05:00 - 06:00 1.00 DRILL P PROD1 RIH TO WINDOW. CLOSE EDC. CONTINUE TO RIH TO TD 06:00 - 06:50 0.83 DRILL P PROD1 HAVING TROUBLE GETTING TO BOTTOM, PU AND GET SLOW PUMP RATES SPR#1 PUMP:3.0 BPM @ 3400 PSI,1.5 BPM @ 2075 PSI,0.3 BPM @ 1475 PSI SPR#2 PUMP: 3.0 BPM @ 3450 PSI,1.5 BPM @ 2080 PSI,0.3 BPM @ 1465 PSI REDUCE PUMP RATE TO 1 BPM TO TRY AND GET TO BOTTOM.LOWER PUMP RATE ALLOWING US TO GET DEEPER AND WORKED OUR WAY TO BOTTOM 06:50 - 08:05 1.25 DRILL P PROD1 DRILLING AHEAD FROM 11,976' FS 3400 PSI,3.0 BPM AT 3530 PSI,DWOB 3.5K ROP 10 FPH PVT=258 BBLS WI-/IA/OA/00A=40/292/83/439 PSI (BLEED OOA DOWN TO<250 PSI MW IN 8.55,MW OUT 8.62, ECD= 10.02 PPG LOSING 8-10 BPH 08:05 - 11:00 2.92 DRILL P PROD1 ROP INCREASED FROM 30 TO 120 FPH AT 12020'.DRILLED TO 12026'AND PU OFF BOTTOM, DISCUSSIONS WITH TOWN TEAM HAS RAISED CONCERNS ABOUT HOLE CLEANING AND DRILLING AT 120 FPH COULD MAKE THINGS WORSE. NEW LOWER LSRV MUD HAS BEEN ORDERED 11:00 - 11:20 0.33 DRILL P PROD1 GEO THINKS WE STILL HAVE-30'OF 22N TO DRILL,TRY DRILLING TO SEE IF THE ROP DROPS TO 30 FPH CONTINUE DRILLING 11:20 - 12:05 0.75 DRILL P PROD1 DRILLED 7'AT>120 FPH,WO NEW MUD THEN FOLLOW THE NEW PLAN FORWARD TO CLEAN THE HOLE TO 4000' 12:05 - 12:40 0.58 DRILL P PROD1 11380'NEW MUD GOING DOWNHOLE,ZERO BOTH IN AND OUT MICRO-MOTIONS RIH TO TD 11850'TAG HIGH, PU AND WORK DOWN 11894'TAG Printed 5/25/2011 3:54:37PM North America-ALASKA- BP Page 20 of 38 Operation Summary Report Common Well Name:06-02 AFE No Event Type: RE-ENTER-ONSHORE(RON) Start Date:4/9/2011 End Date: 5/2/2011 X3-00YL3-C(2,537,875.00) Project: Prudhoe Bay Site: PB DS 06 Rig Name/No.: NORDIC 1 Spud Date/Time: 5/1/1978 12:00:00AM Rig Release: 5/7/2011 Rig Contractor: NORDIC CALISTA UWI:500292028200 Active Datum:2: 02 5/1/1978 00:00 @64.00ft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (ft) 12:40 - 13:35 0.92 DRILL P PROD1 11850'PULLING HEAVY, RIH TO GET FREE AND WORK OUR WAY BACK UP STILL HAVING TO WORK ISSUES WITH THE FLUID MANAGEMENT POLICY SINCE WE ARE SWAPPING TO NEW MUD AND TRIPPING,A LITTLE CONFUSING BUT THE NORDIC SUPT SAID AS LONG AS WE ARE TAKING FLUID FROM A TRUCK TO THE WELL THEN BACK TO THE PITS OR EVEN OUTSIDE,WE ARE OPERATING WITHIN THE NEW GUIDELINES OF THE POLICY 13:35 - 14:00 0.42 DRILL P PROD1 PULLED 1000' IN MM=231 BBLS OUT MM=225.3 LOST 5.7 BBLS OF WHICH 5.5 BBLS IS DISPLACEMENT 14:00 - 15:50 1.83 DRILL P PROD1 FOLLOW PLAN TO OPEN EDC IN OPEN HOLE PULLED TO 10090', RIH UNTIL EDC IS 10' BELOW THIS DEPTH AND SHUT DOWN PUMP CONTINUE RIH AT 1 FPM AND OPEN EDC COME ON LINE AT 1 BPM UNTIL PIPE IS MOVING IN THE UP HOLE DIRECTION INCREASE PUMP RATE TO 3 BPM IN THE PILOT HOLE INCREASE PUMP RATE TO 4.5 BPM IN THE TUBING AND CHASE UP TO 4000' RIG POWER AT 80%AT 4.5 BPM PULLING AT 70 FPM MM PLUGGING OFF—50 BBLS BEFORE BOTTOMS UP LOTS OF FILL COMING BACK 15:50 - 16:00 0.17 DRILL P PROD1 4000'RIH DISPLACIING AT 4.5 BPM, LOST 16:00 - 17:20 1.33 DRILL P PROD1 LOST 1 MOTOR,STOP RIH TO BRING BACK ON LINE 16:05 CONTINUE RIH 17:20 - 17:35 0.25 DRILL P PROD1 CLOSE EDC TIE IN AT 10080' 17:35 - 18:45 1.17 DRILL P PROD1 CORRECT DEPTH+17.5'. CONTINUE TO RIH WITH BHA. ADJUST PUMP RATES AND RUNNING SPEED TO GET TO TD. 18:45 - 20:00 1.25 DRILL P PROD1 TAG BOTTOM. PUW 40K,SOW 11K. RECORD SLOW PUMP RATES AND UPDATE KILL SHEET. D '! J • • • 12,150'WITH MINIMAL ISSUES. STEADY AMOUNT OF CUTTINGS, SHALE,QUARTZ COMING ACROSS SHAKERS. FS 3000 PSI,3270 PSI ON BOTTOM AT 3.0 BPM, DWOB 2.4-4.2K ROP 10-34 FPH INITIAL PVT=258 BBLS, TAKE ON FLUID WHILE DRILLING AHEAD PVT 330 BBLS WI-VIA/OA/00A=33/385/87/20 PSI MW IN 8.5,MW OUT 8.54, ECD=9.7-9.81 PPG LOSING 8-10 BPH Printed 5/25/2011 3:54:37PM North America -ALASKA- BP Page 21 of 38 operation Summary Report Common Well Name:06-02 AFE No Event Type: RE-ENTER-ONSHORE(RON) Start Date:4/9/2011 End Date: 5/2/2011 X3-00YL3-C(2,537,875.00) Project:Prudhoe Bay Site: PB DS 06 Rig Name/No.: NORDIC 1 Spud Date/Time:5/1/1978 12:00:00AM Rig Release: 5/7/2011 Rig Contractor: NORDIC CALISTA UWI: 500292028200 Active Datum:2: 02 5/1/1978 00:00 @64.00ft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (ft) 20:00 - 00:00 4.00 DRILL P PROD1 WIPER TRIP TO WINDOW AT 3 BPM,2740 PSI, 25 FPM. RETURNS CONSISTENT BUT WITH LOSSES. INCREASED CUTTINGS,SHALE AND LARGE SAND/PEBBLES COMING ACROSS SHAKERS. RAN BACK INTO HOLE AT 2.8 BPM,2900 PSI,15-25 FPM WITH STEADY RETURNS ACROSS SHAKERS. ADJUST PUMP RATES, RUN RATE FROM 11,880'TO 12,143' IN ATTEMPT TO REACH TD. LOSSES AVERAGED 8 BPH DURING WIPER TRIP 4/22/2011 00:00 - 00:15 0.25 DRILL P PROD1 ADJUST PUMP RATES, RUN RATE FROM 11,880'TO 12,143'IN ATTEMPT TO REACH TD. CANNOT REACH TD WITHOUT EXCESSIVE STALLING,PRESSURE SPIKES,AND SLACK OFF. 00:15 - 03:00 2.75 DRILL P PROD1 WIPFR TRIP FROM 12,143'AT 3 BPM 2900-2980 PSI. MW IN 8.51, MW OUT 8.54, ECD 9.87 PPG WH/IA/OA/00A=33/364/87/20 PSI LOSSES AVERAGING 8 BPH CUTTINGS HAVE DECREASED IN SIZE AND AMOUNT OF SHALES ACROSS SHAKERS, INCREASE IN CLAY BALLS. 03:00 - 03:30 0.50 DRILL N SFAL PROD1 PARKED STRING AT 9580'PUMPING AT MINIMUM RATE TO KEEP HOLE FULL WHILE TROUBLESHOOTING PROBLEM ON RIG. TELESCOPING RAM CAME OUT OF RAM BODY WHILE ATTEMPTING TO SECURE IT TO SADDLE IN DERRICK. SECURE RAM TO DERRICK,GATHER CREW IN DOGHOUSE TO DISCUSS OPERATION. 03:30 - 05:15 1.75 DRILL N SFAL PROD1 CONTACT ADW FIELD SUPERINTENDENT AND NORDIC FIELD SUPERINTENDENT REGARDING TELESCOPING RAM. CONDUCT AAR ON OPERATION, DEVELOP PLAN FOR SAFELY LOWERING RAM. FIELD SUPERINTENDENTS ON LOCATION. LOWERED RAM WITH NO PROBLEMS. 05:15 - 06:00 0.75 DRILL N SFAL PROD1 POH WITH BHA TO MOVE INJECTOR FOR ACCESS TO RAM AND RAM BODY. IR 2011-IR-3823878 INITIATED FOR INCIDENT. 05:30 POOH 06:00 - 07:45 1.75 DRILL N SFAL PROD1 2500'OUT MM PLUGGIN OFF, BYPASS MM SAMPLES COLLECTED FROM BOTTOMS UP; LARGE PIECES ARE SHALE 07:45 - 08:10 0.42 DRILL N SFAL PROD1 TAG PACK-OFF,JOG IN HOLE 500' 500',SHUT DOWN PUMP,CLOSE EDC,FLOW CHECK WELL AND HOLD PJSM TO LD THE DRILLING BHA 08:10 GOOD NO-FLOW POOH TO LD BHA 08:15 - 09:00 0.75 DRILL N SFAL PROD1 OOH, REMOVE INJECTOR AND SET ON LEGS LD DRILLING BHA BIT GRADE 4-2 IN GAUGE, BROKEN CUTTERS ON FACE OF THE BIT AND 2 CHIPPED SIDE CUTTERS Printed 5/25/2011 3:54:37PM North America-ALASKA- BP Page 22 of 38 Uperation Summary Report Common Well Name:06-02 AFE No Event Type: RE-ENTER-ONSHORE(RON) Start Date:4/9/2011 End Date: 5/2/2011 X3-00YL3-C(2,537,875.00) Project: Prudhoe Bay Site: PB DS 06 Rig Name/No.: NORDIC 1 Spud Date/Time: 5/1/1978 12:00:00AM Rig Release: 5/7/2011 Rig Contractor: NORDIC CALISTA UWI: 500292028200 Active Datum:2: 02 5/1/1978 00:00 @64.00ft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (ft) 09:00 - 10:45 1.75 DRILL N SFAL PROD1 BHA OOH,FILLED HOLE WITH 3.6 BBLS AND CLOSED MASTER INSTALL NIGHT CAP AND PT MASTER AND SWAB INDEPENDENTLY TO OPEN DOORS ON BOP'S.THE WELL HAS BEEN PRODUCING A LOT OF LARGE CUTTINGS AND WE NEED TO INSPECT THE CAVITIES FOR DEBRIS BEFORE PERFORMING A BOP TEST. 10:45 - 11:20 0.58 DRILL N SFAL PROD1 PJSM TO REMOVE FAILED RAM FROM DERRICK 11:20 - 14:35 3.25 DRILL N SFAL PROD1 DETAILED PLAN TO REMOVE RAM DISCUSSED WITH CREW AND NORDIC SUPT, TOOLPUSHER AND SAFETY OFFICER.REMOVE DERRICK SCOPING RAM 14:35 - 15:15 0.67 DRILL N SFAL PROD1 SCOPING RAM REMOVED FROM RIG, REHANG SLB HYDRAULIC HOSES 15:15 - 15:35 0.33 DRILL N SFAL PROD1 AAR FOR REMOVING SCOPING RAM 15:35 - 15:50 0.25 BOPSUR P PROD1 PJSM TO PU INJECTOR TO JET STACK 15:50 - 17:10 1.33 BOPSUR P PROD1 PU INJECTOR AND MU SWIZZLE STICK NOZZLE 16:40 JET STACK 17:10 - 22:30 5.33 BOPSUR P PROD1 PJSM TO PUMP STACK OUT AND INSPECT BOP'S. OPEN BOP DOORS, PULL AND INSPECT ALL RAMS. REPLACED TOP SEALS AND STRIP SEALS IN BLIND RAMS,1 VBR ELEMENT,AND TOP SEALS ON UPPER COMBI RAMS. BODY TEST TREE TO 250 PSI LOW AND 3500 PSI HIGH. GOOD TEST. 22:30 - 00:00 1.50 BOPSUR P PROD1 BOP PRESSURE TEST. AOGCC REP JOHN CRISP WAIVED WITNESS OF TEST. TOURPUSHER,WSL WITNESS TEST. -TEST ACCUMULATOR,WARNING SIRENS AND LIGHTS -CONDUCT TESTS TO 250 PSI LOW AND 3500 PSI HIGH AGAINST CLOSED MASTER AND 'E)c SWAB VALVES WITH 2 7/8"AND 3 1/2"TEST JOINTS 4/23/2011 00:00 - 06:00 6.00 BOPSUR P PROD1 BOP PRESSURE TEST. AOGCC REP JOHN CRISP WAIVED WITNESS OF TEST. TOURPUSHER,WSL WITNESS TEST. -CONDUCT TESTS TO 250 PSI LOW AND 3500 PSI HIGH(ANNULAR TO 2500 PSI)AGAINST CLOSED MASTER AND SWAB VALVES WITH 2 7/8"AND 3 1/2"TEST JOINTS 06:00 - 07:40 1.67 BOPSUR P PROD1 CREW CHANGE,TEST 3-1/2"VARIABLES, DID NOT PASS SERVICE TREE TEST TIW VALVES 07:40 - 07:50 0.17 BOPSUR P PROD1 PJSM TO PU INJECTOR TO TEST THE PACK-OFF AND INNER REEL VALVE 07:50 - 11:00 3.17 BOPSUR P PROD1 PU INJECTOR AND INSTALL BHI CHECK VALVES AND TEST FIRST TEST FAILED,REMOVE CHECK VALVES AND COULD NOT FIND ANYTHING WRONG. INSTALLED 2 NEW CHECKS AND TESTED FINE. 11:00 - 14:30 3.50 BOPSUR N HMAN PROD1 PU THE TEST JOINT TO RETEST A COUPLE OF TESTS FROM THE BOP'S 3-1/2"VARIABLE RAM,3-1/8"MANAUL VALVE ON CHOKE LINE AND BLIND SHEARS GOOD TEST VALVE AND RAMS ABOVE Printed 5/25/2011 3:54:37PM North America -ALASKA- BP Page 23 of 38 u,ieration Summary Report Common Well Name:06-02 AFE No Event Type: RE-ENTER-ONSHORE(RON) Start Date:4/9/2011 End Date: 5/2/2011 X3-00YL3-C(2,537,875.00) Project: Prudhoe Bay Site: PB DS 06 Rig Name/No.: NORDIC 1 Spud Date/Time:5/1/1978 12:00:00AM Rig Release:5/7/2011 Rig Contractor: NORDIC CALISTA UWI:500292028200 Active Datum:2:02 5/1/1978 00:00 @64.00ft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (ft) 14:30 - 15:30 1.00 BOPSUR P PROD1 REMOVE TEST JOINT AND LD INSTALL NIGHT CAP AND PRESSURE TEST CLOSE CHOKE AND OPEN SWAB AND MASTER OPEN TO THE WELL,WELL IS ON A VAC, LOAD WELL PVT= 195 BBLS 15:30 - 15:55 0.42 EVAL P PROD1 HOLE TOOK 20 BBLS,CHECK HSP TO SEE IF WE UNDERBALANCED THE WELL 20 BBLS @ 8.5 PPG IS EQUIVELANT TO 3309 PSI HSP BHP=3279 PSI 3309-3279=30 PSI OVER BALANCE CALL TOWN ODE TO DISCUSS 30 MIN NO-FLOW CHECK AND EITHER A NOZZLE RUN OR MU THE DRILLING BHA PLAN FORWARD;30-MIN NO-FLOW CHECK THEN MU DRILING BHA AND RIH 15:55 - 16:30 0.58 EVAL P PROD1 PERFORM 30 MIN NO-FLOW CHECK PVT= 174 BBLS 16:30 - 17:30 1.00 DRILL P PROD1 GOOD NO FLOW CHECK,HOLE TOOK 0.6 BBLS IN 30 MIN. MU DRILLING BHA PU INJECTOR AND MU UQC TO LQC AND STAB ON WELL 17:30 - 18:30 1.00 DRILL P PROD1 STABBED ON WELL,OPEN EDC,CIRC AT MIN RATE AND TEST TOOLS RIH TAKING RETURNS THROUGH THE SUPER CHOKE 750'GETTING POCKETS OF AIR BACK STOP AT 2000'AND CIRC BOTTOMS UP TO GET AIR OUT. CIRCULATION GOOD, LINE UP RETURNS THROUGH CHOKE. 18:30 - 20:10 1.67 DRILL P PROD1 RIH WITH ERRATIC READINGS OF IN AND OUT RATES. STOP RIH AT 3100'. FLOW • CHECK,NO FLOW. OPEN EDC, CIRCULATE BOTTOMS UP WITH BRIEF 2-3%LEL READINGS. MICROMOTION SHOWING 8.5 PPG IN AND 7.0 PPG OUT. MANUALLY CHECK MW IN PITS AND FROM RETURN LINE;8.5 PPG IN AND 8.6 PPG OUT. WELLHEAD PRESSURE CONSISTENT WITH PREVIOUS READINGS AT 29-33 PSI. 20:10 - 21:05 0.92 DRILL P PROD1 RIH TO 4000'. CIRCULATE BOTTOMS UP WHILE MONITORING MW. RE-CHECK TIGER TANK LINE TO ENSURE LINE IS CLEAR. OUT DENSITY DROPPING ON MM, PIT LEL INCREASED TO 9%. LINE UP RETURNS THROUGH SUPERCHOKE AS CONTINGENCY. WELLHEAD PRESSURE STILL READING 22-29 PSI. OUT RATES AND DENSITY CAME UP AND LEVELED OUT;8.5 PPG IN,8.5 PPG OUT WITH 0%LEL READINGS. 21:05 - 21:45 0.67 DRILL P PROD1 RIH TO 5000', MONITOR PRESSURES AND MW. WELLHEAD AND PUMP PRESSURES GOOD INITIALLY. MW IN AND OUT 8.5 PPG. DENSITY DROPPED,WELLHEAD PRESSURE UP 10 PSI,5%LEL AFTER 10 BBLS OF CIRCULATING. CONTINUE WITH CIRCULATION UNTIL MW IN AND OUT BOTH AT 8.5 PPG,WELLHEAD PRESSURE 18 PSI. END PVT 192. Printed 5/25/2011 3:54:37PM North America -ALASKA- BP Page 24 of 38 Uperation Summary Report Common Well Name:06-02 AFE No Event Type: RE-ENTER-ONSHORE(RON) Start Date:4/9/2011 End Date: 5/2/2011 X3-00YL3-C(2,537,875.00) Project: Prudhoe Bay Site: PB DS 06 Rig Name/No.: NORDIC 1 Spud Date/Time:5/1/1978 12:00:00AM Rig Release: 5/7/2011 Rig Contractor: NORDIC CALISTA UWI:500292028200 Active Datum:2:02 5/1/1978 00:00 @64.00ft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (ft) 21:45 - 22:40 0.92 DRILL P PROD1 RIH TO 6000'. MW IN AND OUT 8.5 PPG INITIALLY. CONTINUE CIRCULATING; DENSITY AND WELLHEAD PRESSURE BOTH FELL OFF AT 15 BBLS INTO CIRCULATION. CIRCULATE UNTIL MW IN AND OUT 8.5 PPG. DENSITY DROPPED,WELLHEAD PRESSURE 10-18 PSI,10%LEL AFTER 19 BBLS OF CIRCULATING. LEL CONTINUED TO RISE WITH CIRCULATION,LEVELED OUT AT 38% AND DROPPED AFTER 25 BBLS AWAY. DENSITY BEGAN TO RISE AFTER 50 BBLS CIRCULATION,MW IN AND OUT BOTH AT 8.5 PPG,WELLHEAD PRESSURE 18 PSI AFTER 60 BBLS. PVT 197. 22:40 - 23:40 1.00 DRILL P PROD1 RIH TO 7000'WITH STABLE MW IN AND OUT AND CONSISTENT WHP. DENSITY DROPPED OFF AT 20 BBLS INTO THE CIRCULATION. WHP REMAINED CONSISTENT AT 22-28 PSI. LEL AT 4%20 BBLS IN,WENT TO 44%AT 50 BBLS AWAY AND THEN DROPPED WITH CONTINUED CIRCULATION. MW AND OUT RATE BEGAN TO STABILIZE AFTER 63 BBLS AWAY(BU AT 68 BBLS). PUMPED ADDITIONAL 7 BBLS BEFORE RIH AGAIN. PVT 202. 23:40 - 00:00 0.33 DRILL P PROD1 RIH TO 8000'WITH STABLE IN AND OUT MW READINGS AT 8.5 PPG,WHP AT 18 PSI. 4/24/2011 00:00 - 00:45 0.75 DRILL P PROD1 CURRENT MD 8000'. DENSITY FELL OFF 30 BBLS INTO CIRCULATION. WHP STEADY AT 22-26 PSI. LEL REACHED 10%BEFORE • DROPPING BACK DOWN. DENSITY CLIMBING AT 75 BBLS AWAY(BU AT 78 BBLS). MW IN AND OUT 8.5 PPG AT 85 BBLS AWAY. END PVT 205 BBLS. 00:45 - 02:15 1.50 DRILL P PROD1 RIH TO 9500'. ISOLATE ACTIVE SYSTEM TO PIT 1,CONTINUE WITH CIRCULATION OUT OF PIT 1 TO TAKE ON REMAINING 100 BBLS OF MUD. MW IN AND OUT 8.5 PPG,WHP 11 PSI. DENSITY BEGAN TO DROP 29 BBLS INTO CIRCULATION. WHP ROSE TO 33 PSI. LEL AT 34%36 BBLS INTO THE CIRCULATION. MUD COMING BACK EXTREMELY DARK WITH POSSIBLE CRUDE MIX 55 BBLS INTO CIRCULATION. LEL MAXED AT 66%70 BBLS INTO THE CIRCULATION. DENSITY BEGINNING TO RISE 93 BBLS INTO CIRCULATION(BU AT 93 BBLS). 0%LEL AT 99 BBLS INTO CIRCULATION. MW IN AND OUT STABILIZED AT 8.5 PPG AT. END PVT 305 BBLS. 02:15 - 02:50 0.58 EVAL P PROD1 CLOSE EDC,SHUT DOWN PUMPS,FLOW CHECK WELL. NO FLOW. TAKE AND RECORD SLOW PUMP RATES,COMPLETE KILL SHEET BEFORE ENTERING OPEN HOLE. Printed 5/25/2011 3:54:37PM North America-ALASKA- BP Page 25 of 38 Laeration Summary Report . . . . ................_...- . . ............. .. Common Well Name:06-02 AFE No Event Type: RE-ENTER-ONSHORE(RON) Start Date:4/9/2011 End Date:5/2/2011 X3-00YL3-C(2,537,875.00) Project: Prudhoe Bay Site: PB DS 06 Rig Name/No.: NORDIC 1 Spud Date/Time: 5/1/1978 12:00:00AM Rig Release: 5/7/2011 Rig Contractor: NORDIC CALISTA UWI:500292028200 Active Datum:2: 02 5/1/1978 00:00 @64.00ft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (ft) 02:50 - 05:00 2.17 DRILL P PROD1 RIH AT 1.1 BPM,1360 PSI. EXIT WINDOW. LOG TIE IN AT 10,080';-20'CORRECTION. CONTINUE RIH. GAS ENTRAINED MUD COMING BACK BEGINNING AT 10,680'(ALL MEASURED DEPTHS ASSOCIATED TO DENSITY OR GAS READINGS ARE FOR REFERENCE ONLY AND NOT TIED TO BU READINGS) -LEL READINGS RANGING FROM 4-14%. DIFFICULTY RIH FROM 10,680'TO 10,777'. -DENSITY AND OUT RATE BACK TO NORMAL AT 10,840'. MW IN AND OUT 8.5 PPG. -DENSITY DROPPING TO 8.1 PPG AT 10,890' -AT 11,055':LEL 4-6%, MW IN 8.5 PPG,MW OUT 8.1 PPG, IN RATE 2.99 BPM,OUT RATE AT 3.09,RIH AT 30 FPM, CIRCULATING 3065 PSI,WHP 66 PSI -AT 11,230':LEL 6-9%, MW IN 8.52 PPG,MW OUT 7.92 PPG, IN RATE 2.98 BPM, OUT RATE 3.01 BPM,RIH AT 30 FPM, CIRCULATING 3020 PSI,WHP 70 PSI DIFFICULTY WORKING THROUGH 11,450'-11,505' -MW IN 8.5 PPG,MW OUT 7.8 PPG, LEL 2% WHILE WORKING THROUGH 11,630'-11,740' -ENCOUNTERING PUW UP TO 75K WITH INCREASE IN ECD TO 11.47 PPG -28 BBLS LOST TO FORMATION DURING TRIP IN 05:00 - 06:00 1.00 DRILL P PROD1 WIPER TRIP TO CLEAN HOLE, PUMP AT 3 BPM,3690 PSI. PUW 75K AT 11,510'. ECD AT 11.15 PPG. TROUBLE WORKING THROUGH 11,470'-11,400'. ECD DROPPED TO 10.4 AT 11,200'. OUT RATE AND DENSITY CLIMBING. MW IN 8.5,MW OUT AT 8.4 BUT CLIMBING. -CONTINUING OOH AT 3 BPM,3110 PSI. MW IN 8.53,MW OUT 8.62, ECD 10.13 PPG -WI-I/IA/OA/OOA=62/0/105/150 PSI -LOSSES AVERAGING 3 BPH,PUW 39-40K -LARGE AMOUNT OF SAND, SHALES ACROSS SHAKERS -LOST 18 BBLS BETWEEN 11,550'TO 10,550', MW IN 8.53 PPG,MW OUT 8.67 PPG, ECD 10.12-10.17 PPG -OPEN EDC AT WINDOW,RIH 50', PU AND CONTINUE WIPER TRIP AT 3.9 BPM. -MW IN 8.56 PPG,MW OUT 8.7-8.8 PPG,PUW 38K, ECD 10.11 PPG. LOST 13 BBLS FROM 10,500'TO 9900'. -CALCULATED LOSSES AT 13 BPH. -8700'INCREASE RATE TO 4.5 AND SPEED TO 60 FPM 06:00 - 09:20 3.33 DRILL P PROD1 PULLED TO 4000', OUT MM PLUGGED OF AT 4100'. PUMP BOTTOMS UP FROM M 4000' 09:20 - 10:00 0.67 DRILL P PROD1 SHUT DOWN TO CLEAN POSSUM BELLY, ITS FULL 10:00 - 11:05 1.08 DRILL P PROD1 RIH TO CONTINUE DRILLING OPS 11:05 - 11:20 0.25 DRILL P PROD1 STOP AT 10043'AND CLOSE THE EDC, RIH 10080 AND TIE IN -CORRECT DEPTH+16.5'AND RIH Printed 5/25/2011 3:54:37PM North America-ALASKA- BP Page 26 of 38 operation Summary Report Common Well Name:06-02 AFE No Event Type: RE-ENTER-ONSHORE(RON) Start Date:4/9/2011 End Date:5/2/2011 X3-00YL3-C(2,537,875.00) Project:Prudhoe Bay Site: PB DS 06 Rig Name/No.: NORDIC 1 Spud Date/Time:5/1/1978 12:00:00AM Rig Release: 5/7/2011 Rig Contractor:NORDIC CALISTA UWI:500292028200 Active Datum:2:02 5/1/1978 00:00 @64.00ft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (ft) 11:20 - 14:50 3.50 DRILL P PROD1 -10700'TAGGING TOP OF THE 22N,TRY WORKING DOWN.MADE IT THROUGH "'PVT=226 BBLS"** -11420'TAG SHALE AND STACKED OUT, PU AND TRY WORKING DOWN -11468 TAG,PU AND KEEP WORKING DOWN -11481'STOP RIH AND BACKREAM BACK TO 11380' -11380'RIH AND THE HOLE IS PACKING OFF BEHIND THE BHA,WT DROPPING OFF FAST AND PRESURE SLOWLY COMING UP. -11429'STACKED OUT WITH VERY LITTLE MOTOR WORK PU 68K AND WORK DOWN -11489'TAG WITH MOTOR WORK,PU AND TRY WORKING DOWN.TAG AGAIN, PU AND TRY WORKING DOWN AT 3-5 FPM -11592'TAG,PU AND WORK DOWN PU WT'S 65-74K -11855'TAG, PU AND WORK DOWN -11893'TAG,PU AND WORK DOWN PU WT'S 60-72K 14:50 - 15:15 0.42 DRILL P PROD1 MADE IT TO 11913'WITHOUT PUMPING THEN STACKED OUT WITH NO WOB MADE IT TO 11931'PU WT'S 65-70K 15:15 - 16:20 1.08 DRILL P PROD1 NOT MAKING MUCH PROGRESS, PU WT'S ARE GETTING HEAVIER CALL ODE TO DISCUSS OPTIONS. POOH TO CASING*"BHST=160°"' BIT STUCK AT 11835',SHUT DOWN PUMP AND WORK PIPE IN BOT DIRECTIONS STACKED OUT AND POPPED FREE, PU AND MOVED 2'THE BIT STUCK AGAIN.WORK PIPE DOWN AND POPPED FREE.WORKED PIPE BACK AND FORTH WITHOUT PUMP AND ABLE TO MOVE UP HOLE 16:20 - 16:50 0.50 DRILL P PROD1 10675'BIT STUCK,SHUTDOWN PUMP AND WORK PIPE PULLED FREE 16:50 - 17:15 0.42 DRILL P PROD1 PULLED TO 10080'THEN JOGGED IN HOLE TO 10150' OPEN EDC WHILE RIH @ 1 FPM EDC OPEN COME ON LIE AT 1 BPM PUH AND INCREASE RATE TO 3 BPM, PULL PAST WS INTO TT AT 9800' 9800'INCREASE RATE TO 4.5 BPM AND CIRC BOTTOMS UP 17:15 - 17:50 0.58 DRILL P PROD1 PLAN FORWARD, CLEAN HOLE FROM 10650' UP TO 4000' 17:50 - 19:00 1.17 DRILL P PROD1 OUT MICRO-MOTION PLUGGING OFF WITH LARGE PEBBLES OF SHALE. CLEAN OUT MICROMOTION WHILE CONTINUING WITH WIPER TO 4000'. 19:00 - 21:30 2.50 DRILL P PROD1 RIH WITH BHA TO 10,050'. CLOSE EDC. CONTINUE RIH TO 10,600' OBTAIN AND RECORD SLOW PUMP RATES AND COMPLETE KILL SHEET. PU, PUMP 17 BBL HI-VIS SWEEP. RIH TO TIME SWEEP TO HIT WHEN BIT AT 10,610'. Printed 5/25/2011 3:54:37PM North America -ALASKA- BP Page 27 of 38 Liperation Summary Report Common Well Name:06-02 AFE No Event Type: RE-ENTER-ONSHORE(RON) Start Date:4/9/2011 End Date:5/2/2011 X3-00YL3-C(2,537,875.00) Project:Prudhoe Bay Site: PB DS 06 Rig Name/No.: NORDIC 1 Spud Date/Time: 5/1/1978 12:00:00AM Rig Release:5/7/2011 Rig Contractor: NORDIC CALISTA UWI:500292028200 Active Datum:2:02 5/1/1978 00:00 @64.00ft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (ft) 21:30 - 00:00 2.50 DRILL P PROD1 WIPER TRIP TO 4000'. PULL UP HOLE AT 3 BPM,3075 PSI, MW IN 8.48 PPG,MW OUT 8.51 PPG, ECD 9.69-10.03 PPG,PUW 37K. -RETURN OF SWEEP DID NOT INCREASE CUTTINGS SIGNIFICANTLY. MOSTLY SAND, SOME LARGE SHALE CUTTINGS. -OPEN EDC AT 10,050',JOG DOWN AND TURN AROUND TO WIPE UP HOLE TO 9700' AT 3.4 BPM,3105 PSI. INCREASE RATE TO 3.8 BPM AT 3300 PSI FROM 9700'TO 4000'. AT 8000'AS OF MIDNIGHT. -AVERAGING 8 BPH LOSSES;PVT 140 BBLS -RECEIVED ORDERS FROM TOWN TO CONTINUE WITH HOLE CLEANING UNTIL DOWNHOLE PRESSURES AND PU/SO WEIGHTS STABILIZE AND MINIMAL CUTTINGS ACROSS SHAKERS. FLAT FACED BILLET WILL BE SET FOR OPFNHOLE SIDETRACK 4/25/2011 00:00 - 01:40 1.67 DRILL P PROD1 WIPER TRIP FROM 8000'TO 4000'AT 3.8 BPM, 3260 PSI,MW IN 8.51 PPG,MW OUT 8.51 PPG. NO CUTTINGS ACROSS SHAKERS FROM 8000'TO 4000'. CIRCULATE BOTTOMS UP WHILE RECIPROCATING FROM 4000'TO ENSURE NOTHING ON LOW SIDE. SMALL AMOUNT OF SAND AND SHALE MIX ACROSS SHAKERS WITH BOTTOMS UP. PVT 137 01:40 - 04:00 2.33 DRILL P PROD1 ONE MORE RUN THROUGH HOLE TO 10,650' TO ENSURE CLEAN WELLBORE FOR BILLET RUN. RIH WITH EDC OPEN, PUMPING AT 3.8 BPM,3320-3395 PSI,TO 10,050'. CLOSE EDC. CONTINUE TO RIH WITH TO 10,610'. PVT 157 04:00 - 06:50 2.83 DRILL P PROD1 PUMP HI-VIS PILL AND TIME IT TO ARRIVE ON BOTTOM WITH BIT AT 10,610'. PICK UP HOLE CHASING PILL TO 10.500'. TURN AROUND AND RIH WITH HI-VIS PILL ALREADY IN COIL TO BE TIMED TO HIT AS BIT IS AT 10,610' AGAIN. PICK UP HOLE SLOWLY CHASING PILL TO 10,300'. TURN AROUND AGAIN TO TIME THIRD PILL EXITING AS BIT IS AT 10,610'. CHASE PILL TO SURFACE. OPEN EDC AT WINDOW,JOG DOWN 100',TURN AROUND AND CONTINUE WITH WIPER TRIP AT 3.9 BPM,3450 PSI. SWEEPS DID NOT BRING BACK INCREASE IN CUTTINGS; BU ACROSS SHAKERS WITH ALL PILLS OUT OF HOLE A LIGHT SAND AND SHALE MIX. -PVT AT 140;43 BBLS LOST TO WELL THROUGH TOUR FOR AVERAGE OF 3 1/2 BPH LOSSES -2500'OUT MM PACKING OFF,GO TO BYPASS 06:50 - 07:20 0.50 DRILL P PROD1 TAG UP AND OUT MM PLUGGED OFF, BYPASS AND JOG IN HOLE 500' FLOW CHECK WELL,GOOD NO FLOW POOH TO LD DRILLING BHA 07:20 - 08:15 0.92 DRILL P PROD1 OOH, PJSM TO LD BHA LD BHA 08:15 - 11:45 3.50 DRILL P PROD1 BHA LD, FILL HOLE WITH 2 BBLS AND WO OPS NOTE APPROVAL 11:45 - 12:00 0.25 DRILL P PROD1 PJSM TO LOAD BILLET BHA ON THE RIG, Printed 5/25/2011 3:54:37PM North America -ALASKA- BP Page 28 of 38 Operation Summary Report Common Well Name:06-02 AFE No Event Type: RE-ENTER-ONSHORE(RON) Start Date:4/9/2011 End Date:5/2/2011 X3-00YL3-C(2,537,875.00) Project: Prudhoe Bay Site: PB DS 06 Rig Name/No.: NORDIC 1 Spud Date/Time:5/1/1978 12:00:00AM Rig Release: 5/7/2011 Rig Contractor: NORDIC CALISTA UWI: 500292028200 Active Datum:2:02 5/1/1978 00:00 @64.00ft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (ft) 12:00 - 12:20 0.33 DRILL P PROD1 LOAD BILLET BHA ON THE RIG AND SCRIBE HIGH SIDE 12:20 - 12:40 0.33 DRILL P PROD1 PJSM TO MU THE BILLET BHA 12:40 - 13:20 0.67 DRILL P PROD1 MU BILLET BHA AND SET CENTER OF 2 SLIPS TO HIGH SIDE,3 SLIPS LOW SIDE 13:20 - 16:05 2.75 DRILL P PROD1 RIH WITH EDC OPEN @ 80 FPM PER BTT RECOMMENDATIONS 15:55 SLOW RIH SPEED ENTERING TOC SHEATH IN TUBING 16:05 - 16:40 0.58 DRILL P PROD1 10050'STOP RIH,SHUT DOWN PUMP AND CLOSE EDC.RIH TO 10080'TO TIE IN 16:10 TIE IN 16:40 - 17:00 0.33 DRILL P PROD1 CORRECT DEPTH-19', RIH TO 10520'@ 20-25 FPM SMALL TAGS AT 10180',10251',10467' 17:00 - 17:35 0.58 DRILL P PROD1 RIH TO 10520'AND PU TO 10500.7'PLACING THE TOP OF THE BILLET AT 10490'.ONLINE WITH PUMP AND SETTING TOOL SHEARED AT 3400 PSI.SET DOWN 6.4K DOWN AND BILLET IS SET. POOH DISPLACING VOIDAGE AND INCREASE RATE AT WINDOW TO 3.2 BPM THROUGH SETTING TOOL 17:35 - 17:45 0.17 DRILL P PROD1 STOP AT 9700'FOR KICK WHILE TRIPPING DRILL SLB SUPERVISOR ANNOUNCED OVER THE RADIO THAT HE HAS AN INCREASE IN OUT FLOW AND HAS STOPPED THE COIL AND SHUT DOWN THE PUMP.DRILLER SENT HIS CREW TO THE SHAKER, KOOMEY AND CELLAR,AND THE SLB EQUIPMENT OPERATOR ASSISTED THE DRILLER ON THE FLOOR. FLOOR HAND AT THE SHAKER REPORTS NO FLOW,EVERYTHING IN THE CELLAR LOOKS GOOD.DRILL COMPLETED WITH AN AAR 17:45 - 19:15 1.50 DRILL P PROD1 CONTINUE POOH. TAG AT SURFACE AND JOG BACK DOWN. POH TO SURFACE. BHA AT SURFACE. 19:15 - 19:45 0.50 EVAL P PROD1 FLOW CHECK WELL, NO FLOW. 19:45 - 20:15 0.50 DRILL P PROD1 POP OFF INJECTOR. LD BILLET SETTING BHA. INSPECT TOOL, GOOD SETTING. INSTALL NIGHTCAP. 20:15 - 20:45 0.50 DRILL P PROD1 PJSM ON COIL MANAGEMENT. CONDUCT COIL MANAGEMENT. CUT 100'OF COIL. 20:45 - 00:00 3.25 DRILL P PROD1 INSTALL COIL TUBING CONNECTOR AND RE-HEAD. PRESSURE TEST CHECK VALVES TO 250 PSI LOW AND 2500 PSI HIGH. CONDUCT MEG TEST ON E-LINE. MONITOR WELL FOR PRESSURE,FLOW. NO FLOW. PULL NIGHT CAP, FILL WELL WITH 5.4 BBLS MUD(3/4 BPH LOSSES WHILE AT SURFACE). CONTINUE TO MU BHA:3.75"X4.25" BI-CENTER BIT,2 7/8"ULTRA X-TREME MOTOR SET TO 2.2 DEG, HOT, DGS, DPS, EDC,POWERCOMMS,SUB WEAR PROTECTOR, LQC, UQC,XO,CTC. 4/26/2011 00:00 - 03:00 3.00 DRILL P PROD1 OPEN EDC, RIH WITH DRILLING BHA TO 10,050'. CLOSE EDC. LOG TIE-IN AT 10,080'. -19 1/2'CORRECTION. Printed 5/25/2011 3:54:37PM North America -ALASKA- BP Page 29 of 38 V,eration Summary Report Common Well Name:06-02 AFE No Event Type: RE-ENTER-ONSHORE(RON) Start Date:4/9/2011 End Date: 5/2/2011 X3-00YL3-C(2,537,875.00) Project: Prudhoe Bay Site: PB DS 06 Rig Name/No.: NORDIC 1 Spud Date/Time: 5/1/1978 12:00:00AM Rig Release: 5/7/2011 Rig Contractor: NORDIC CALISTA UWI:500292028200 Active Datum:2: 02 5/1/1978 00:00 @64.00ft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (ft) 03:00 - 04:00 1.00 DRILL P PROD1 RIH TO 10,480'AT 1.8 BPM,2000 PSI. OBTAIN SLOW PUMP RATES,PUW 37K. COME DOWN ON PUMPS, RIH AND DRY TAG BILLET AT 10,495.75'. PU AND BRING ON PUMPS TO 2.25 BPM WHILE SLOWLY PULLING UP HOLE TO INITIATE SIDETRACK TRENCH. LOST SIGNAL FROM HOT. ATTEMPTED TO TRANSMIT TO IT SEVERAL TIMES WITH NO LUCK. POH FOR REPLACEMENT. 04:00 - 04:30 0.50 EVAL N DFAL PROD1 POH. COME DOWN ON PUMPS. OPEN EDC. FLOW CHECK WELL. NO FLOW. 04:30 - 06:45 2.25 DRILL N DFAL PROD1 POH TO SURFACE AT 2.3 BPM, 1890 PSI. 06:45 - 07:00 0.25 DRILL N DFAL PROD1 500'SHUT DOWN PUMP AND FLOW CHECK WELL WHILE CLOSING EDC GOOD NO-FLOW CHECK POOH 07:00 - 07:15 0.25 DRILL N DFAL PROD1 OOH, HOLD PJSM TO UNSTAB AND LD THE DRILLING BHA 07:15 - 07:45 0.50 DRILL N DFAL PROD1 REMOVE INJECTOR AND SECURE LD BHA,BIT UNTOUCHED 07:45 - 08:15 0.50 DRILL P PROD1 STOP OPERATIONS TO DISCUSS COIL LIFE BEFORE KICKING OFF BILLET 08:15 - 10:00 1.75 DRILL P PROD1 DECISION MADE TO SWAP REELS,CALL FOR N2 AND PREP TO BLOW DOWN REEL KEEP HOLE FULL DURING THESE OPS UNTIL MASTER HAS TO BE CLOSED TO BLOW DOWN 10:00 - 10:35 0.58 DRILL P PROD1 PJSM WITH ALL CREW MEMBERS AND N2 CREW TO BLOW DOWN REEL 10:35 - 11:00 0.42 DRILL P PROD1 PU INJECTOR AND STAB ON WELL 11:00 - 11:20 0.33 DRILL P PROD1 FILL HOLE 11:20 - 18:30 7.17 DRILL P PROD1 PT MASTER AND SWAB INDEPENDENTLY TO SECURE WELL 250 PSI LOW AND 3500 PSI HIGH GOOD TEST,WELL IS SECURE AND THE NORDIC TOOL PUSHER WILL BE MY DESIGNEE TO OVERSEE THE OPERATIONS UNTIL RICH CAN MAKE IT TO THE RIG 18:30 - 21:00 2.50 DRILL P PROD1 TRUCK FOR COIL REMOVAL STAGED. NEW COIL STAGED AT END OF PAD. CONDUCT PJSM WITH ENTIRE CREW AND CH2MHILL DRIVER AND PUSHER. SWAP OUT REELS. JOB WENT WELL. CONDUCT AAR WITH CREW AND DRIVERS. COMMENTS WERE THAT JOB WENT WELL,CENTERLINE PAINTED ON RIG BOMBAY DOOR HELPED WITH ALIGNMENT, HYDRAULIC CONTROLS COULD USE SLIGHT ADJUSTMENT(ACTION ITEM ALREADY CREATED FOR ELECTRICIAN). 21:00 - 00:00 3.00 DRILL P PROD1 PREPARE REEL FOR OPERATIONS:STRIP OFF PROTECTIVE PLASTIC, RETRIEVE BANDING, PREP CONNECTIONS,STAGE INNER REEL HARD IRON. BEGIN HAMMERING UP HARD IRON. 4/27/2011 00:00 - 05:15 5.25 DRILL P PROD1 MU, HAMMER UP HARD IRON FOR INNER REEL. MU BULKHEAD TO JUNCTION BOX. INSTALL GRAPPLE. PULL TEST AND RE-TIGHTEN GRAPPLE. Printed 5/25/2011 3:54:37PM North America -ALASKA- BP Page 30 of 38 V1eration Summary Report Common Well Name:06-02 AFE No Event Type: RE-ENTER-ONSHORE(RON) Start Date:4/9/2011 End Date: 5/2/2011 X3-00YL3-C(2,537,875.00) Project: Prudhoe Bay Site: PB DS 06 Rig Name/No.: NORDIC 1 Spud Date/Time: 5/1/1978 12:00:00AM Rig Release:5/7/2011 Rig Contractor: NORDIC CALISTA UWI: 500292028200 Active Datum:2: 02 5/1/1978 00:00 @64.00ft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (ft) 05:15 - 06:40 1.42 DRILL P PROD1 PJSM ON PULLING REEL ACROSS. PULL REEL ACROSS. TEST E-LINE. 06:40 - 08:40 2.00 DRILL P PROD1 INSPECT GOOSENECK ROLLERS AND PACKOFFS. CHANGE OUT PACKOFFS. 08:40 - 09:00 0.33 DRILL P PROD1 CONDUCT SLACK MANAGEMENT 09:00 - 10:00 1.00 DRILL P PROD1 PRESSURE TEST SWAB AND MASTER VALVES 10:00 - 11:20 1.33 DRILL P PROD1 CHANGE OUT BRASS 11:20 - 12:30 1.17 DRILL P PROD1 CONDUCT SLACK MANAGEMENT 12:30 13:00 0.50 DRILL P PROD1 PRESSURE TEST INNER REEL TO 4000 PSI. PRESSURE TEST INNER REEL VALVE AND PACKOFF TO 250 PSI LOW,3500 PSI HIGH. 13:00 - 14:00 1.00 DRILL P PROD1 CIRCULATE TO WARM UP COIL. CUT 30'OF COIL TO EXPOSE E-LINE. 14:00 - 15:00 1.00 DRILL P PROD1 RE-TEST E-LINE AND INSTALL COIL CONNECTOR. CONDUCT PULL TEST TO 35K. 15:00 - 15:30 0.50 DRILL P PROD1 HEAD UP UQC. PRESSURE TEST TO 300 PSI LOW,4000 PSI HIGH. 15:30 - 16:30 1.00 DRILL P PROD1 PUMP 5 BBL METHANOL SPEAR BACK INTO REEL 16:30 - 17:30 1.00 DRILL P PROD1 PRESSURE TEST TREE CAP,OPEN WELL TO FILL WELL. TOOK 4 1/2 BBLS. PRESSURE TEST REEL MANIFOLD TO 250 PSI LOW,4000 PSI HIGH. 17:30 - 20:00 2.50 DRILL N RREP PROD1 TROUBLESHOOT MICROMOTION. WORK ON UNIT. PUMP FRESH WATER THROUGH UNIT TO TEST. UNIT OPERATIONAL. 20:00 - 21:00 1.00 DRILL P PROD1 PJSM ON PRESSURE TESTING CHECK VALVES. PT VALVES TO 250 PSI LOW AND 2500 PSI HIGH. 21:00 - 22:00 1.00 DRILL P PROD1 PJSM ON MAKING UP BHA MU BHA: 3.75"X4.25"BI-CENTER BIT.2 7/8" X-TREME MOTOR, HOT, DGS, DPS, EDC, POWERCOMMS,SUB WEAR PROTECTION, LQC, UQC,XO, CTC. MU INJECTOR TO WELL. SURFACE TEST TOOLS. CIRCULATE AT SURFACE TO CLEAR COIL VOLUME AND GET MUD AROUND. 22:00 - 00:00 2.00 DRILL P PROD1 RIH WITH BUILD BHA to 9300'WITH NO PROBLEMS 4/28/2011 00:00 - 01:30 1.50 EVAL P PROD1 RIH WITH DRILLING BHA TO 10,000'. CIRCULATE BOTTOMS UP WITH NO ISSUES. FLOW CHECK WELL. NO FLOW. OBTAIN SLOW PUMP RATES,COMPLETE KILL SHEET. CLOSE EDC. 01:30 - 02:30 1.00 DRILL P PROD1 RIH TO 10,080'. LOG TIE-IN. -25.5' CORRECTION. CONTINUE TO RIH TO 10.480'. I 1 COME DOWN ON PUMPS. DRY TAG BILLET. PU,COME ON WITH PUMPS. RIH UNTIL TAG. CONFIRM TAG WITH MOTOR WORK. 02:30 - 03:50 1.33 DRILL P PROD1 TIME MILL OFF OF BILLET AT 1 FPH,240 DEG, 2.53 BPM,8.51 PPG MW IN,8.51 PPG MW OUT,2790-3260 PSI CIRC PRESSURE,2770 FREE SPIN,.35-2.6K WOB DURING MILLING OPERATIONS. ALUMINUM ACROSS SHAKERS. CONTROL DRILL TO 10,520'. Printed 5/25/2011 3:54:37PM North America-ALASKA- BP Page 31 of 38 l,peration Summary Report Common Well Name:06-02 AFE No Event Type: RE-ENTER-ONSHORE(RON) Start Date:4/9/2011 End Date:5/2/2011 X3-00YL3-C(2,537,875.00) Project:Prudhoe Bay Site: PB DS 06 Rig Name/No.: NORDIC 1 Spud Date/Time:5/1/1978 12:00:00AM Rig Release:5/7/2011 Rig Contractor:NORDIC CALISTA UWI:500292028200 Active Datum:2: 02 5/1/1978 00:00 @64.00ft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (ft) 03:50 - 04:00 0.17 DRILL P PROD1 PICK UP HOLE WITH MINIMUM PUMP RATE TO CONFIRM SIDETRACK. RUN BACK DOWN AND CONFIRM GOOD KICK OFF. 04:00 - 06:00 2.00 DRILL P PROD1 DIRECTIONALLY DRILL AHEAD FROM 10.520'., BEGIN MUD DISPLACEMENT TO 9.0 PPG MUD WITH CLAY SEAL. PUMP PRESSURES, ECDS GOOD WITH NEW MUD AROUND. 2.51-2.58 BPM IN,2.49-2.65 BPM OUT, MW IN 8.91,MW OUT 8.97,CIRC PRESSURE FELL FROM 3300 PSI BEFORE DISPLACEMENT TO 2670 PSI DURING DRILLING AHEAD, ECD 9.89 PPG,WOB 2.42-3.91 K 06:00 - 11:00 5.00 DRILL P PROD1 CONTINUE DRILLING AHEAD FROM 10600'. 2.6 BPM @ 2620 PSI FREE SPIN ECD=10.01 PPG ROP—10 FPH 11:00 - 12:00 1.00 DRILL P PROD1 MUD SLIGHTLY GAS CUT. TAKE 25 BBLS OVERBOARD TO RETURN TANK. BROUGHT MUD BACK INSIDE AND DID NOT REGISTER ANY GAS WITH HAND HELD MONITOR. NO DENSITY CHANGE NOTED AND NO ADDITIONAL GAIN IN PIT VOLUME. CONTINUE DRILLING AHEAD. 12:00 - 13:00 1.00 DRILL P PROD1 ROP SLOWING TO<10 FPH WITH STATOR PIECES NOTED ON THE SHAKER. ALSO NOTING OCCASIONAL BIT PLUGGING. CONTINUE TO ATTEMPT TO DRILL AHEAD. 13:00 - 15:45 2.75 DRILL P PROD1 POOH TO CHANGE OUT SUSPECTED BAD MOTOR. HOLD PRE-TRIP MEETING WITH SCHLUMBERGER SUPERVISOR AND NORDIC DRILLER. VERIFIED PVT WITH MANUAL STRAP. OPEN EDC AT WINDOW AND PUMP AT 4.2 BPM ON TRIP OUT OF HOLE. 15:45 - 16:00 0.25 DRILL P PROD1 PJSM FOR BHA CHANGE 16:00 - 16:15 0.25 DRILL P PROD1 LD BHA. BIT WAS 1,1. 16:15 - 16:45 0.50 DRILL P PROD1 NOTICE FOREIGN OBJECT IN STACK ABOVE FLUID LEVEL. PJSM AND BEGIN RIGGING UP VAC TRUCK TO EMPTY THE STACK AND TRY AND RECOVER UNKNOWN OBJECT. 16:45 - 17:30 0.75 DRILL P PROD1 RECOVERED A 12.5"X 0.75"X 0.1"PIECE OF ALUMINUM BILLETT FROM THE BOP STACK. MU BUILD BHA:3.75"X4.25"BI-CENTER BIT,2 7/8" X-TREME MOTOR, HOT, DGS, DPS, EDC, POWERCOMMS,SUB WEAR PROTECTION, LQC, UQC,XO, CTC. 17:30 - 20:30 3.00 DRILL P PROD1 RIH WITH DRILLING BHA MONITORING FOR ANY GAS ENTRAINED MUD 20:30 - 20:45 0.25 EVAL P PROD1 OBTAIN SLOW PUMP RATES,COMPLETE KILL SHEET. DOWN ON PUMPS. FLOW CHECK WELL. CLOSE EDC. 20:45 - 21:10 0.42 DRILL P PROD1 RIH. LOG TIE-IN AT 10,080'. -25' CORRECTION. CONTINUE TO RIH AND COME DOWN TO MINIMAL PUMPS AS TRIPPING PAST BILLET. NO BOBBLES. CONTINUE RIH TO 10,630'. WORK THROUGH TO GET TO 10,630'TO 10,640'. 4 BBLS LOST ON TRIP IN. Printed 5/25/2011 3:54:37PM North America -ALASKA- BP Page 32 of 38 operation Summary Report Common Well Name:06-02 AFE No Event Type: RE-ENTER-ONSHORE(RON) Start Date:4/9/2011 End Date: 5/2/2011 X3-00YL3-C(2,537,875.00) Project: Prudhoe Bay Site: PB DS 06 Rig Name/No.: NORDIC 1 Spud Date/Time: 5/1/1978 12:00:00AM Rig Release: 5/7/2011 Rig Contractor: NORDIC CALISTA UWI: 500292028200 Active Datum:2: 02 5/1/1978 00:00 @64.00ft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (ft) 21:10 - 00:00 2.83 DRILL P PROD1 DRILL DIRECTIONALLY AHEAD FROM 10,630' TO 10,723' -2.5-2.76 BPM IN,2.53-2.71 BPM OUT,8.9 PPG MW IN,8.9 PPG MW OUT,2400 PSI FREE SPIN,2470-3195 PSI ON,9.9-9.95 PPG ECD, 3.02-6.68K WOB INITIAL LOSSES AT 2 BPH;SOME ERRATIC LOSSES WHILE DRILLING FROM 10,702'-10,731' END PVT 246 BBLS 4/29/2011 00:00 - 01:45 1.75 DRILL P PROD1 DRILL DIRECTIONALLY AHEAD FROM 10.723' TO 10,750' -2.76 BPM IN,2.71 BPM OUT,8.9 PPG MW IN, 9.0 PPG MW OUT,2570 PSI FREE SPIN,2930 PSI ON,9.95 PPG ECD,3.75K WOB -SHALE ACROSS SHAKERS; PUMPED 10 BBL HI-VIS SWEEP AT 10,750'AND CHASED IT OUT OF HOLE ON WIPER TRIP -END PVT 248 BBLS,AVG 1-2 BPH LOSSES WHILE DRILLING AHEAD 01:45 - 04:00 2.25 DRILL P PROD1 WIPER TRIP FROM 10,750'TO WINDOW. OPEN EDC, RUN DOWN HOLE—100'. CONTINUE WIPER TRIP AT MAX RATE. SWEEP BROUGHT BACK—20%INCREASE IN RETURNS WITH PRIMARILY SHALE CUTTINGS. BHA AT SURFACE. JOG BACK DOWN. FLOW CHECK WELL WHILE MICROMOTION IS BLOWN DOWN. PULL UP HOLE TO SURFACE WITH BHA. PJSM ON POPPING OFF INJECTOR, LD BHA. PVT 158 BBLS(ON SURFACE WITH ADDITIONAL 150 BBLS ON LOCATION IN VAC TRUCK),AVG 7 BPH LOSSES ON WIPER TRIP. 04:00 - 04:45 0.75 DRILL P PROD1 LD BHA. BIT GRADE 1-1-ER-A-X-I-X-BHA. CLEAN HIGH PRESSURE SCREENS. 04:45 - 06:00 1.25 BOPSUR P PROD1 PRESSURE TEST MASTER AND SWAB VALVES TO 250 PSI LOW,3500 PSI HIGH. JET STACK TO CLEAN OF POSSIBLE METAL DEBRIS FROM MILLING BILLET. OPEN BOP DOORS TO INSPECT. FUNCTION TEST BOP, ACCUMULATOR. 06:00 - 09:00 3.00 BOPSUR P PROD1 JET BOP STACK WITH SWIZZLE STICK. FUNCTION TEST BOP'S FROM COILED TUBING SUPERVISOR STATION. 09:00 - 09:30 0.50 DRILL P PROD1 CHANGE OUT MOTOR FROM 2.2 DEG BEND TO 1.5 DEG BEND,ADD RESISTIVITY TOOL, RUN SAME 3.75"X4.25"BI-CENTER BIT. BHA: 3.75"X4.25"BI-CENTER BIT,2 7/8"ULTRA LS X-TREME MOTOR WITH 1.5 DEG BEND, HOT, USMPR, DGS, DPS, EDC, POWERCOMMS, SUB WEAR PROTECTION, LQC, UQC,XO, CTC. 09:30 - 11:15 1.75 DRILL P PROD1 RIH WITH LATERAL BHA Printed 5/25/2011 3:54:37PM North America -ALASKA- BP Page 33 of 38 L eration Summary Report Common Well Name:06-02 AFE No Event Type: RE-ENTER-ONSHORE(RON) Start Date:4/9/2011 End Date:5/2/2011 X3-00YL3-C(2,537,875.00) Project: Prudhoe Bay Site: PB DS 06 Rig Name/No.: NORDIC 1 Spud Date/Time:5/1/1978 12:00:00AM Rig Release: 5/7/2011 Rig Contractor: NORDIC CALISTA UWI: 500292028200 Active Datum:2:02 5/1/1978 00:00 @64.00ft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (ft) 11:15 - 13:00 1.75 DRILL P PROD1 LOG TIE-IN FROM 10080'. CORRECT-25'. RIH TO 10500'AND BEGIN MAD PASS @ 300 FPH. SET DOWN AT 10640'AND ATTEMPT TO WORK THROUGH. UNABLE TO DRILL THROUGH. MAX OVERPULLS AND FREQUENT PACKING OFF WORK FREE AND PERFORM WIPER TRIP TO TOP OF PILOT HOLE AT 9700' 13:00 - 15:00 2.00 DRILL P PROD1 WIPER TRIP TO TOP OF CEMENT PILOT HOLE AT 9700' 15:00 - 15:40 0.67 DRILL P PROD1 BACK ON BOTTOM AND ATTEMPTING TO CLEAN OUT THROUGH 10650' CLEAN-OUT TO 10740'AND FIND A HARD BOTTOM 15:40 - 16:00 0.33 EVAL P PROD1 MAD PASS UP FROM 10740'TO 10600'AT 300 FPH. 16:00 - 18:00 2.00 DRILL P PROD1 BACK ON BOTTOM DRILL AHEAD FROM 10740' 3.22 BPM/3.23 BPM 8.95 PPG IN DENSITY 3470 PSI DRILLING PRESSURE • PVT=273 BBLS ECD= 10.17 PPG 1.5K-1.8K WOB. LOSSES—6-7 BPH. 18:00 - 00:00 6.00 DRILL P PROD1 WIPER TRIP TO 4000'TO CLEAN HOLE. CALL FIELD SUPERINTENDENT TO DISCUSS PLAN FORWARD TO DEAL WITH SHALE INSTABILITY. PLAN IS TO BUIILD NEW MUD SYSTEM WITH INCREASED WEIGHT FROM 9.0 PPG TO 9.5 PPG,GREATER PERCENTAGE OF KCL(NO NaCL), 14 LB PER BBL OF BDF-499. MUD SYSTEM BEING BUILT. OPEN EDC AT 10,050',SLOWLY RIH—100',PICK BACK UP HOLE INTO WINDOW. BRING UP PUMPS TO MAX RATE. NICKEL AND DIME SIZE ROUNDED AND SMOOTH SHALE ACROSS SHAKER PRETTY MUCH ENTIRE TRIP UP. SHAKERS CLEANED UP TO VERY LITTLE OR NO CUTTINGS AS COIL POH ABOVE 7000'. 7 BBLS LOST TO FORMATION DURING WIPER TRIP. 4/30/2011 00:00 - 01:15 1.25 DRILL P PROD1 RIH AT MAX PUMP RATE AND RUNNING RATE TO ENSURE CASED HOLE IS FLUSHED CLEAN. 290 BBLS NEW MUD SYSTEM ON LOCATION. 01:15 - 06:00 4.75 DRILL N WAIT PROD1 SLOWLY RECIPROCATE IN CASING AND PUMP AT.6 BPM WHILE WAITING ON SECOND DELIVERY OF NEW MUD SYSTEM FOR DISPLACEMENT. AVERAGE FLUID LOSS 1-2 BPH WHILE RECIPROCATING. PVT AT 0500 HRS 256 BBLS. 06:00 - 07:30 1.50 DRILL P PROD1 NEW MUD SYSTEM ON LOCATION. BEGIN SWAPPING MUD AND CLEANING PITS. 07:30 - 08:40 1.17 DRILL P PROD1 NEW MUD AT THE BIT. CLOSE EDC AND CONTINUE RUNNING IN HOLE. Printed 5/25/2011 3:54:37PM North America -ALASKA- BP Page 34 of 38 aeration Summary Report Common Well Name:06-02 AFE No Event Type: RE-ENTER-ONSHORE(RON) Start Date:4/9/2011 End Date: 5/2/2011 X3-00YL3-C(2,537,875.00) Project: Prudhoe Bay Site: PB DS 06 Rig Name/No.: NORDIC 1 Spud Date/Time:5/1/1978 12:00:00AM Rig Release: 5/7/2011 Rig Contractor: NORDIC CALISTA UWI: 500292028200 Active Datum:2: 02 5/1/1978 00:00 @64.00ft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (ft) 08:40 - 10:30 1.83 DRILL P PROD1 BEGIN TO RUN IN HOLE THROUGH THE 22N SHALE. .5 BPM AND 970 PSI TO RUN THROUGH 22N WITH MULTIPLE SET DOWNS OF 10-15K. ABLE TO RUN THROUGH THE 22N WITH SET DOWNS AT 10615',10624',10637',10642'. PUMP 10 BBL HIGH VIS(150K LSRV)PILL TO SWEEP CUTTINGS FROM HOLE. PEA GRAVEL SIZE SHALE NOTED AT THE SHAKER. 10:30 - 12:20 1.83 DRILL P PROD1 DRILL AHEAD FROM 10800' 3.06 BPM 3193 FREE SPIN 329 PVT VOLUME 10.5 PPG ECD ROP—40-60 FPH. LOSSES—6-7 BPH. 12:20 - 13:15 0.92 DRILL P PROD1 CONTINUE DRILLING AHEAD FROM 10878' WITH BRIEF LOSSES NOTED AT 10875' 3.1/3.0 BPM AT 3398 PSI 321 PVT VOLUME 9.36/9.334 PPG 10.49 PPG ECD ROP=30-60FPH RETURNS APPEAR TO BE FINE, DENSE SANDS WITH 5%SHALE 13:15 - 14:30 1.25 DRILL P PROD1 WIPER TRIP FROM 10900'. PUMP 10 BBL HIGH VIS SWEEP(150K LSRV)TO TIME OUT EXITING THE BIT BELOW THE 22N SHALE. PULL THROUGH THE 22N FROM 10700'MD WHILE PUMPING AT MINIMUM RATE(0.5 BPM). SLIGHT OVERPULLS NOTED AT 10654'AND 10647'BUT OTHERWISE A CLEAN TRIP PULLING THROUGH THE 22N. WIPER TRIP BACK TO BOTTOM SAW SET DOWNS AT • 10654',10668',10678'AND 10682'. 14:30 - 18:30 4.00 DRILL P PROD1 DRILL AHEAD FROM 10,900'TO 11,001' 3.14/3.12 BPM @ 3538 PSI PVT=297 BBLS ECD= 10.55 PPG 9.36/9.33 PPG 18:30 - 20:00 1.50 DRILL P PROD1 PUMP COMBINATION 10 BBL LO-VIS PILL OF TREATED 9.5 PPG KCL WATER FOLLOWED BY 10 BBL HI-VIS(150K LSRV)PILL TO PREPARE FOR WIPER TRIP TO SWEEP CUTTINGS OUT OF THE HOLE. CUT PUMPS TO.2 BPM WHILE PULLING BHA THROUGH 10,720'TO 10,600'AND WHILE PULLING ACROSS BILLET AT 10,490'. BEGINING PVT 252 BBLS. Printed 5/25/2011 3:54:37PM "'orth America -ALASKA- BP Page 35 of 38 Operation Summary Report Common Well Name:06-02 AFE No Event Type: RE-ENTER-ONSHORE(RON) Start Date:4/9/2011 End Date: 5/2/2011 X3-00YL3-C(2,537,875.00) Project:Prudhoe Bay Site: PB DS 06 Rig Name/No.: NORDIC 1 Spud Date/Time:5/1/1978 12:00:00AM Rig Release: 5/7/2011 Rig Contractor:NORDIC CALISTA UWI:500292028200 Active Datum:2: 02 5/1/1978 00:00 @64.00ft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (ft) 20:00 - 22:00 2.00 DRILL P PROD1 PULL INTO WINDOW AND COME DOWN ON PUMPS. FLOW CHECK WELL. OPEN EDC. JOG DOWN, PICK BACK UP HOLE INCREASING PUMP RATES TO 3.8 BPM,3270 PSI. COMBO SWEEP BROUGHT BACK—10% INCREASE IN CUTTINGS, PRIMARILY SAND. AS RETURNS KEPT COMING ACROSS SHAKERS WITH WIPER,SHALE PROPORTIONS ROSE. FINE CUTTINGS ACROSS SHAKERS. CUTTINGS SIZE BEGAN TO INCREASE SOME, NOTHING LARGER THAN A PEA,AS BHA WAS PULLED THROUGH 8000'TO 6500'. CASED HOLE SEEMS TO BE CLEANING UP WELL WITH HIGH FLOW RATE. END PVT AFTER WIPER TO 4000'198 BBLS;AFTER PROPER DISPLACEMENT CALCULATIONS,4 BBLS LOST TO FORMATION,15 BBLS OVER SHAKERS. 22:00 - 00:00 2.00 DRILL P PROD1 TURN AROUND AND RIH FROM 4000'AT HIGH RUNNING RATE TO ASSIST IN INCREASING AVS TO FLUSH HOLE. BEGINNING PVT 198 BBLS. RIH TO WINDOW. FLOW CHECK. CLOSE EDC. PVT AT 222 BBLS;6 BBL LOSS TO FORMATION DURING TRIP TO WINDOW. 5/1/2011 00:00 - 00:15 0.25 DRILL P PROD1 CLEAN POSSUM BELLY WHILE CONDUCTING FLOW CHECK. —GALLON BUCKET OF LARGE QUARTER SIZE SHALE IN POSSUM BELLY. 00:15 - 00:45 0.50 DRILL P PROD1 RIH WITH BHA. LOG TIE IN AT 10,080'WITH +10.8'CORRECTION. MINIMUM PUMPS ACROSS BILLET AND THROUGH SHALE ZONE OF 10,600'-10,720'. NO ISSUES PASSING THROUGH SHALE ZONE. TAGGED UP ONCE AT 10,800'. NO PROBLEMS WITH RIH THE REST OF WAY TO TD. 00:45 - 04:00 3.25 DRILL P PROD1 DIRECTIONALLY DRILL AHEAD FROM 11,001' TO 11,100'. ADD 100 BBLS TO SYSTEM WHILE DRILLING AHEAD; DUMP 5 BBLS DURING SWEEP RETURNS. -SAND AND FINE SHALE CUTTINGS ACROSS SHAKERS,LOW ROP WHILE DRILLING AHEAD AT 11,080' -2.92-3 BPM IN,2.85-3 BPM OUT,9.38 PPG MW IN,9.35 PPG MW OUT,2970 PSI FREE SPIN,3175-3450 PSI ON,39K PUW,12-14K SOW, ECD DROPPED FROM 10.62 TO 10.45 PPG -PUMP 10 BBL 9.5 PPG KCL WATER LO-VIS PILL FOLLOWED BY 10 BBL HI-VIS(150K LSRV)SWEEP AT 11,050'WHILE CONTINUING TO DRILL AHEAD. RETURNS WITH SWEEP AT SURFACE INCREASED—10%WITH FINE SAND AND SHALE CUTTINGS, NO PEBBLES. -PUMP 10 BBL 9.5 PPG KCL WATER LO-VIS PILL FOLLOWED BY 10 BBL HI-VIS(150K LSRV)SWEEP AT 11,100'IN PREPARATION FOR WIPER. -35 BBLS LOST DURING DRILLING AHEAD, AVERAGE OF 9 BPH(20 BBLS ADDED BY LO-VIS SWEEPS) Printed 5/25/2011 3:54:37PM "firth America -ALASKA- BP Page 36 of 38 Operation Summary Report Common Well Name:06-02 AFE No Event Type: RE-ENTER-ONSHORE(RON) Start Date:4/9/2011 End Date: 5/2/2011 X3-00YL3-C(2,537,875.00) Project:Prudhoe Bay Site: PB DS 06 Rig Name/No.: NORDIC 1 Spud Date/Time:5/1/1978 12:00:00AM Rig Release: 5/7/2011 Rig Contractor: NORDIC CALISTA UWI: 500292028200 Active Datum:2:02 5/1/1978 00:00 @64.00ft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (ft) 04:00 - 04:45 0.75 DRILL P PROD1 WIPER TRIP TO WINDOW. PVT 299 AT BEGINNING. RETURNS WITH SWEEP AT SURFACE INCREASED VERY LITTLE;FINE SAND AND LITTLE SHALE CUTTINGS,VERY LITTLE PEBBLES. DROP PUMPS DOWN TO.5 BPM AND ORIENT BIT WHILE PULLING THROUGH SHALES AT 10,700'TO 10,600'. BRING PUMPS BACK UP UNTIL 10,500'. DROP PUMPS AGAIN WHILE PULLING ACROSS BILLET. PICK BACK UP ON WIPER TRIP TO WINDOW. PVT 286 BBLS AT WINDOW,LOST 7 BBLS DURING WIPER TRIP. 04:45 - 05:15 0.50 DRILL P PROD1 RIH WITH BHA. BEGIN PVT AT 286 BBLS. SAME STRATEGY PASSING BY BILLET AND THROUGH SHALES. LOST 4 BBLS ON TRIP IN. 05:15 - 06:00 0.75 DRILL P PROD1 DIRECTIONALLY DRILL AHEAD FROM 11,100'. BEGINNING PVT 288 BBLS. 06:00 - 11:00 5.00 DRILL P PROD1 DRILL AHEAD FROM 11155' PUMP 10 BBL LOW VIS/10 BBL HIGH VIS SWEEP OFF BOTTOM(11150') 3.06 BPM 3380 PSI PVT=266 BBLS ECD= 10.6 PPG NO SIGNIFICANT INCREASE IN CUTTINGS WHEN HIGH/LOW SWEEP AT SURFACE PUMP 10 BBL LOW VIS/10 BBL HIGH VIS SWEEP OFF BOTTOM(11200') 3.1 BPM 3270 PSI PVT=261 BBLS ECD=10.5 PPG 11:00 - 15:30 4.50 DRILL P PROD1 WIPER TRIP FROM 11204' SLIGHT OVER PULL NOTED AS WELL PULLED THROUGH THE 22N PUMPING.5 BPM AT 10634'. PULLED OUT OF HOLE TO 4000'MD.DID NOT NOTE ANY ADDTIONAL CUTTINGS DURING BOTTOMS UP PUMPING. AVERAGED.2 BPM LOSSES ON TRIP OUT OF HOLE. WIPER TRIP TO BOTTOM WITH OUT SET DOWNS THROUGH THE 22N 15:30 - 22:45 7.25 DRILL P PROD1 DRILL AHEAD FROM 11203'TO 11,350', 3.1 BPM 3384 PSI,PVT=330 BBLS ECD= 10.52 PPG,WOB=3-4K,9.41/9.42 PPG ROP=20-32 FPH -LOSSES VARIED FROM 8-12 BPH;TOOK ON 83 BBLS WHILE DRILLING AHEAD; END PVT 292 22:45 - 23:45 1.00 DRILL P PROD1 WIPER TRIP TO WINDOW. PVT 292 AT BEGINNING. FINE SAND AND LITTLE SHALE CUTTINGS,VERY LITTLE PEBBLES. DROP PUMPS DOWN TO.3 BPM AND ORIENT BIT WHILE PULLING THROUGH SHALES AT 10,710'TO 10,600'. COUPLE OF BOBBLES BUT NO SIGNIFICANT PUW THROUGH SHALES. BRING PUMPS BACK UP UNTIL 10,500'. DROP PUMPS AGAIN WHILE PULLING ACROSS BILLET. PICK BACK UP ON WIPER TRIP TO WINDOW. PVT 272 BBLS AT WINDOW,LOST 13 BBLS DURING WIPER TRIP TO WINDOW. Printed 5/25/2011 3:54:37PM "-with America-ALASKA- BP Page 37 of 38 Operation Summary Report Common Well Name:06-02 AFE No Event Type: RE-ENTER-ONSHORE(RON) Start Date:4/9/2011 End Date:5/2/2011 X3-00YL3-C(2,537,875.00) Project: Prudhoe Bay Site: PB DS 06 Rig Name/No.: NORDIC 1 Spud Date/Time:5/1/1978 12:00:00AM Rig Release: 5/7/2011 Rig Contractor: NORDIC CALISTA UWI: 500292028200 Active Datum:2:02 5/1/1978 00:00 @64.00ft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (ft) 23:45 - 00:00 0.25 DRILL P PROD1 RIH FROM WINDOW. LOG TIE-IN AT 10,080' WITH A +10 1/2'CORRECTION. CONTINUE TO RIH WITH SAME CYCLING OF PUMPS AND BIT ORIENTATION AS ON WIPER TIRP OUT. PVT AFTER LOGGING 271 BBLS. 5/2/2011 00:00 - 00:50 0.83 DRILL P PROD1 RIH FROM WINDOW. LOG TIE-IN AT 10,080' WITH A +10 1/2'CORRECTION. CONTINUE TO RIH WITH SAME CYCLING OF PUMPS AND BIT ORIENTATION AS ON WIPER TRIP OUT. PVT AFTER LOGGING 271 BBLS. BBLS LOST ON TRIP TO BOTTOM 5.5 BBLS. 00:50 - 05:15 4.42 DRILL P PROD1 DIRECTIONALLY DRILL AHEAD FROM 11,350' TO 11,450'. ADD 22 BBLS TO SYSTEM WHILE DRILLING AHEAD. PVT AT 304 BBLS. PUMP 15 BBL 9.5 PPG KCL WATER LO-VIS FOLLOWED BY 10 BBL HI-VIS(150K LSRV) SWEEP AT 11,360'WHILE CONTINUING TO DRILL AHEAD. RETURNS WITH SWEEP AT SURFACE INCREASED-10%WITH FINE SAND AND SHALE CUTTINGS, NO PEBBLES. -3.05 BPM IN,2.86-2.94 BPM OUT,9.45 PPG MW IN,9.39 PPG MW OUT,3180 PSI FREE SPIN,3320-3545 PSI ON,39K PUW,12-14K SOW,ECD 10.61 PPG -PUMP 10 BBL 9.5 PPG KCL WATER LO-VIS PILL FOLLOWED BY 10 BBL HI-VIS(150K LSRV)SWEEP AT 11,445'IN PREPARATION FOR WIPER. -AVERAGE OF 9 BPH LOSSES WHILE 1 DRILLING AHEAD;PVT AT 251 BBLS ()'\6°05:15 06:00 0.75 DRILL P PROD1 WIPER TRIP TO WINDOW. GEOLOGIST (�V CONSULTED WITH TOWN REGARDING PAY ZONE AND SHALES ENCOUNTERED. WELL C,ONSIDERFD TD AT 11 450 06:00 - 09:00 3.00 DRILL P PROD1 CONTINUE TO CIRCULATE ABOVE THE CEMENT PILOT HOLE WHILE WAITING ON FINAL PLAN FORWARD 09:00 - 10:35 1.58 DRILL P PROD1 CIRCULATE NEW MUD DOWN THE COIL NEAR THE TOP OF THE CEMENT PILOT HOLE AT-9700'TO TOP OFF PITS BEFORE TIE-IN RUN. 10:35 - 10:55 0.33 DRILL P PROD1 LOG TIE-IN FROM 10080'. CORRECT+2'. 10:55 - 14:30 3.58 DRILL P PROD1 RIH TO CONFIRM TD AND CLEAN/CONDITION HOLE RIH PUMPING.3 BPM AND HOLDING AS DRILLED TF WITH NO SET DOWNS CONFIRM TD AT 11450' PUMP LOW/HIGH VIS SWEEP AND THEN PULL UP THROUGH 22N SHALE WHILE PUMPING.3 BPM. NO OVERPULLS NOTED. PUMP SECOND LOW/HIGH VIS SWEEP WHILE RECIPROCATING NEAR BOTTOM AND WAITING ON LINER RUNNING PILL. 14:30 - 15:00 0.50 DRILL P PROD1 LINER RUNNING PILL ON LOCATION. PJSM AND LINE UP TO PUMP/LAY IN LINER RUNNING PILL. Printed 5/25/2011 3:54:37PM ''orth America -ALASKA- BP Page 38 of 38 Operation Summary Report Common Well Name:06-02 AFE No Event Type: RE-ENTER-ONSHORE(RON) Start Date:4/9/2011 End Date: 5/2/2011 X3-00YL3-C(2,537,875.00) Project:Prudhoe Bay Site: PB DS 06 Rig Name/No.: NORDIC 1 Spud Date/Time:5/1/1978 12:00:00AM Rig Release:5/7/2011 Rig Contractor:NORDIC CALISTA UWI:500292028200 Active Datum:2:02 5/1/1978 00:00 @64.00ft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (ft) 15:00 - 17:45 2.75 DRILL N HMAN PROD1 BEGIN PUMPING LINER RUNNING PII I AND NOTIFIED BY BAROID THAT THE LINER PILL DID NOT HAVE ANY SHALE INHIBITOR OR LUBRICANTS. CIRCULATED OUT LINER RUNNING PILL AND INSTRUCTED BAROID TO BEGIN MIXING NEW LINER RUNNING PILL WITH ALL INHIBITORS AND LUBRICANTS. WAIT ON NEW PILL. 17:45 - 22:00 4.25 DRILL P PROD1 NEW PILL ON LOCATION. LINE UP TO RIG AND TAKE ON FLUID. LAY IN 9.5 PPG KCL LINER RUNNING PILL WITH LUBRICANTS AND STICKLESS BEADS ON TRIP OUT OF HOLE TO WINDOW. SLIGHT OVERPULL AT 10,680' AND 10,665'ON TRIP OUT OF HOLE. FLOW CHECK AT WINDOW,OPEN EDC AND CONTINUE OUT OF HOLE AT MAX RATE. SOME DEBRIS ACROSS SHAKERS BUT PRIMARILY FINE SANDS. TD FLAG PAINTED AT 9400'AND WINDOW FLAG PAINTED AT 8000'. 22:00 - 23:00 1.00 DRILL P PROD1 PJSM ON LD BHA. FLOW CHECK. POP OFF INJECTOR,LD BHA. BIT GRADE AT 1-1-NO-A-X-I-NO-TD. AAR CONDUCTED, GOOD JOB ALL AROUND ON LAY DOWN. 23:00 - 00:00 1.00 DRILL P PROD1 PJSM ON PUMPING SLACK FORWARD. MU INJECTOR TO WELLHEAD. PUMP SLACK. Printed 5/25/2011 3:54:36PM North America-ALASKA- BP Page 1 of 6 Operation Summary Report Common Well Name:06-02 AFE No Event Type:COM-ONSHORE(CON) Start Date: 5/3/2011 End Date:5/7/2011 X3-00YL3-C(1,073,611.00) Project:Prudhoe Bay Site: PB DS 06 Rig Name/No.: NORDIC 1 Spud Date/Time:5/1/1978 12:00:00AM Rig Release: 5/7/2011 Rig Contractor:NORDIC CALISTA UWI:500292028200 Active Datum:2:02 5/1/1978 00:00 @64.00ft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (ft) 5/3/2011 00:00 - 04:00 4.00 CASING P RUNPRD PUMP E-LINE SLACK FORWARD. MAKE CUT 12'OF COIL TUBING. MU CTC. CONDUCT PULL TEST AND PRESSURE TEST. PUMP 3/4" BALL TO DRIFT COIL. WELL STATIC DURING OPERATIONS. 04:00 - 05:00 1.00 CASING P RUNPRD PREP TO RUN LINER. PJSM ON MU AND RUNNING LINER. 05:00 - 06:00 1.00 CASING P RUNPRD MU PRODUCTION LINER 06:00 - 12:10 6.17 CASING P RUNPRD CONTINUE MU PRODUCTION LINER. 12:10 - 12:20 0.17 CASING P • RUNPRD MU INJECTOR AND ESTABLISH CIRCULATION THROUGH LINER AT MINIMUM RATE. 12:20 - 14:45 2.42 CASING P RUNPRD RIH. WT CHECK AT WINDOW=38.9K PICK UP AND 16.4K RUN IN WEIGHT CONTINUE RIH AND WORK LINER FROM 10680'DOWN. LAND LINER ON BOTTOM AT 11476'CTMD 14:45 - 15:30 0.75 CASING P RUNPRD ESTABLISH PICKUP AND BREAK OVER WEIGHTS. LAUNCH 5/8"BALL TO DISCONNECT FROM LINER DISCONNECTED FROM LINER AT 43.8 BBL PUMPED AND 4000 PSI. LINE UP TO DISPLACE WELL TO XS KCL. 15:30 - 18:00 2.50 CASING P RUNPRD CIRCULATE WELL OVER TO XS KCL. 2.0 BPM @ 1000 PSI AFTER WELL DISPLACED TO XS KCL. 1.5 BPM @ 650 PSI 1.0 BPM @ 360 PSI • 0.5 BPM @ 150 PSI 18:00 - 18:30 0.50 CASING P RUNPRD CREW CHANGE OUT AND WALK AROUND. 18:30 - 21:45 3.25 CASING P RUNPRD BUILD 100BBL OF 2#BIOZAN. RU CEMENTERS. 21:45 - 22:30 0.75 CEMT P RUNPRD CONDUCT PJSM WITH CEMENT CREW AND RIG TEAM. DISCUSS MUSTER AREA,GOOD COMMUNICATION AND JOB PROCEDURE. Printed 5/25/2011 3:55:06PM "orth America -ALASKA- BP Page 2 of 6 Operation Summary Report Common Well Name:06-02 AFE No Event Type:COM-ONSHORE(CON) Start Date: 5/3/2011 End Date: 5/7/2011 X3-00YL3-C(1,073,611.00) Project: Prudhoe Bay Site: PB DS 06 Rig Name/No.: NORDIC 1 Spud Date/Time:5/1/1978 12:00:00AM Rig Release: 5/7/2011 Rig Contractor: NORDIC CALISTA UWI:500292028200 Active Datum:2: 02 5/1/1978 00:00 @64.00ft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (ft) 22:30 - 00:00 1.50 CEMT P RUNPRD PRESSURE TEST CMT LINES AND INNER REEL TO 4500 PSI AND BATCH UP 30 BBLS CEMENT. BEGIN PUMPING 2 BPM 21.5 BBL 15.8 PPG CEMENT STAGE: 5 BBLS= 1500 PSI 10 BBLS= 1900 PSI i e14f 15 BBLS=2340 PSI 20 BBLS=2700 PSI 21.5 BBLS SHUT DOWN CEMENTERS AND LINE UP WITH RIG PUMP. IN MM AND OUT MM 21.5 BBLS ZERO IN MM. 2#BIOZAN STAGE: 10 BBLS=1.92 BPM IN/1.92 BPM OUT @ 1980 PSI. 20 BBLS= 1.91 BPM IN/1.90 BPM OUT @ 1100 PSI. 30 BBLS=1.89 BPM IN/1.88 BPM OUT @ 920 PSI. 40 BBLS SLOWED PUMP RATE WHILE PASSING LWP 45 BBLS=1.62 BPM IN/1.32 BPM OUT @ 490 PSI. 50 BBLS=1.62 BPM IN/1.60 BPM OUT @ 934 PSI. 51.7 ZERO OUT MM WHEN CMT AT SHOE. 57.8 BBLS SHUT DOWN PUMPS AND SIDE EXHAUST 2BBLS CEMENT AND 3 BBLS 2# BIOZAN. PU TO COIL BREAKOVER AT 11,466'+13'AND SET DOWN 10K SET PUMP TRIP AT 700 PSI AND ROLL PUMPS TO LAUNCH PEE WEE DART. PU 2'AND WITNESS PRESSURE DROP. SIDE EXHAUST 2 BBLS CEMENT AND 3 BBLS 2#BIOZAN. OPEN BAKER CHOKE. SET BACK DOWN WITH COIL WITH 10K DOWN CLOSE BAKER CHOKE. SHEAR LINER WIPER PLUG WITH AT 3100 PSI .82 BPM IN/.74 BPM OUT @ 1620 PSI. LINER WIPER PLUG LANDED AT 12.3 BBLS (12.6 BBLS CALCULATED) PRESSURE UP 1000 PSI AND HOLD PRESSURE. OPEN BAKER CHOKE AND BLEED OFF COIL PRESSURE CHECK FLOATS. FLOATS APPEAR TO BE HOLDING WITH NO RETURNS NOTED AT SHAKER. UNSTING FROM LINER TOP AND PUMP 5 BBLS 2#BIOZAN AT 1 BPM NEAR LINER TOP. 5/4/2011 00:00 - 02:30 2.50 CEMT P RUNPRD PU FREE OF LINER AND POOH REPLACING PIPE VOIDAGE PLUS 0.5 BPM. 02:30 - 03:00 0.50 CEMT P RUNPRD FLOW CHECK AT SURFACE.NO FLOW. 03:00 - 03:30 0.50 CEMT P RUNPRD PJSM TO LD LINER RUNNING BHA. ADD 60 BBLS KCL FROM TRUCK TO PITS. Printed 5/25/2011 3:55:06PM ' orth America-ALASKA- BP Page 3 of 6 Operation Summary Report Common Well Name:06-02 AFE No Event Type: COM-ONSHORE(CON) Start Date: 5/3/2011 End Date: 5/7/2011 X3-00YL3-C(1,073,611.00) Project: Prudhoe Bay Site: PB DS 06 Rig Name/No.: NORDIC 1 Spud Date/Time:5/1/1978 12:00:00AM Rig Release:5/7/2011 Rig Contractor: NORDIC CALISTA UWI: 500292028200 Active Datum:2:02 5/1/1978 00:00 @64.00ft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (ft) 03:30 - 04:30 1.00 CEMT P RUNPRD LD LINER RUNNING BHA. BALL STUCK ON SEAT WSL VERIFIED ITS LOCATION AND THE TOOLS WERE SENT BACK TO BTT. 04:30 - 08:30 4.00 EVAL P OTHCMP BRING MCNL LOGGING TOOLS UP TO FLOOR. 08:30 - 10:00 1.50 EVAL P OTHCMP RIH WITH CLEAN OUT/LOGGING BHA PUMPING AT.2 BPM 10:00 - 10:55 0.92 EVAL P OTHCMP WT CK AT 9650'=32.5K PICKUP WEIGHT AND 13K RUN IN WEIGHT. CONTINUE RUNNING IN HOLE TO CLEAN OUT AND LOG. 10:55 - 12:40 1.75 EVAL P OTHCMP TAG AT 11421'. PICKUP WEIGHT=40K AT 11412' LOG UP PASS AT 60 FPM TO 9350' LOG DOWN PASS TO PBTD AT 30 FPM 12:40 - 15:00 2.33 EVAL P OTHCMP POOH LAYING IN PERFORATING PILL PAINT EOP FLAG AT 11025.7'MEASURED DEPTH.(9000'EOP) 15:00 - 17:00 2.00 EVAL P OTHCMP STANDING BACK 30 STANDS OF 1.25"CSH 17:00 - 17:30 0.50 EVAL P OTHCMP PJSM TO LD MCNL LOGGING TOOLS. 17:30 - 18:10 0.67 EVAL P OTHCMP CREW CHANGE AND WALK AROUNDS. 18:10 - 19:00 0.83 EVAL P OTHCMP LD LOGGING BHA. 19:00 - 20:15 1.25 EVAL P OTHCMP JET THE STACK TO CLEAN OUT ANY CEMENT. 20:15 - 20:45 0.50 PERFOB P OTHCMP PJSM TO RUN GUNS IN THE HOLE. 20:45 - 23:30 2.75 PERFOB P OTHCMP PU 27 GUNS(2.00"6SPF 2006PJ). PERF INTERVALS 10,800'TO 10,950'AND 11,000'TO 11,350'. 23:30 - 00:00 0.50 PERFOB P OTHCMP PJSM TO STRAP 23 STANDS OF 1.25"CSH AND RIH FROM DERRICK. 5/5/2011 00:00 - 01:50 1.83 PERFOB P OTHCMP STRAP 23 STANDS OF 1.25"CSH AND RIH FROM DERRICK. 01:50 - 04:00 2.17 PERFOB P OTHCMP STAB INJECTOR ON WELL AND RIH AT 83 FPM. MM IN.24 BPM/MM OUT.70 BPM AT 150 PSI. AT EOP FLAG MADE A-10'CORRECTION. (CORRECTED EOP IS AT 8,996'PER SLB MCNL LOG) 04:00 - 04:15 0.25 PERFOB P OTHCMP TAGGED PBTD AT 11,417'MADE A-5' CORRECTION. (CORRECTED PBTD IS 11,411.82'PER SLB MCNL LOG) PU TO PERFORATING DEPTH AT 11,350.7' 04:15 - 08:15 4.00 PERFOB P OTHCMP SWAP WELL OVER TO 8.4 PPG XS 2%KCL. IN MM.75BPM/OUT MM.78BPM AT 900 PSI. 08:15 - 09:50 1.58 PERFOB P OTHCMP PRESSURE TEST LINER LAP. UNABLF TO TEST LINER LAP AFTER TWO ATTFMPTS. FIRST ATTEMT INJECTION ESTABLISHED AT .5 BPM AND 1840 PSI. SECOND ATTEMPT INJECTION ESTABLISHED AT.4 BPM AND / 1700 PSI. SEE ATACHED SCANNED COPY OF ✓ PRESSURE CHART. NOTIFY WTL AND SUPERINTENDENT WITH TEST RESULTS. GIVEN VERBAL O.K.TO PROCEED WITH PERFORATING. Printed 5/25/2011 3:55:06PM "orth America -ALASKA- BP Page 4 of 6 Operation Summary Report Common Well Name:06-02 AFE No Event Type: COM-ONSHORE(CON) Start Date: 5/3/2011 End Date: 5/7/2011 X3-00YL3-C(1,073,611.00) Project: Prudhoe Bay Site: PB DS 06 Rig Name/No.: NORDIC 1 Spud Date/Time:5/1/1978 12:00:00AM Rig Release: 5/7/2011 Rig Contractor:NORDIC CALISTA UWI:500292028200 Active Datum: 2: 02 5/1/1978 00:00 @64.00ft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (ft) 09:50 - 10:10 0.33 PERFOB P OTHCMP INITIATE FIRING SEQUENCE FOR PERFORATING GUNS. GOOD INDICATION OF FIRING = - L•-- OF ' TURNS AND FLOW RESUMED. PERFORATED THE FOLLOWING INTERVALS WITH 2.0"6 SPF PJ GUNS: 10800'-10950' AND 11000'-11350'. 10:10 - 12:30 2.33 PERFOB P OTHCMP `%.• FLOW CHECK AT 9600'FOR 15 MINUTES. NO FLOW OBSERVED. FILLED THE HOLE WITH 4 BBLS AND RESUMED TRIP OUT OF HOLE. 12:30 - 12:45 0.25 PERFOB P OTHCMP OOH FLOW CHECK FOR 15 MINUTES. NO FLOW OBSERVED. FILLED THE HOLE WITH 5 BBLS 12:45 - 13:00 0.25 PERFOB P OTHCMP PJSM FOR STANDING BACK 23 STANDS 1.25" CSH 13:00 - 14:30 1.50 PERFOB P OTHCMP STAND BACK 23 STANDS 1.25"CSH 14:30 - 16:45 2.25 PERFOB P OTHCMP LD 2 JTS 1.25"CSH, FIRING HEAD AND 27 PERF GUNS. 16:45 - 17:30 0.75 PERFOB P OTHCMP RD SLB PERFORATORS AND BRING LTP TO FLOOR. 17:30 - 19:00 1.50 PERFOB P OTHCMP MU NOZZZLE AND CIRCULATE 8.3 PPG KCL AROUND. 19:00 - 19:30 0.50 CASING P RUNPRD PJSM TO PU LTP BHA. 19:30 - 20:30 1.00 CASING P RUNPRD MU LTP, DRIFTED 2-3/8"PH6. STAB INJECTOR ON WELL. 20:30 - 23:00 2.50 CASING P RUNPRD RIH @ 75 FPM WITH LTP. MM IN.23 BPM/MM OUT.53 BPM @ 145 PSI MM OUT BOUNCING FROM.53 BPM/8.9 PPG TO 0 BPM/0 PPG.THOUGHT IT MIGHT BE • PERF GAS OR AIR.CALLED AND INFORMED ADW CTD SUPERINTENDANT. TAKING RETURNS TO TIGER TANK THE ENTIRE TIME TRIP IN HOLE. AT 9600'UP WT 35K/DN WT 17K. 23:00 - 00:00 1.00 CASING P RUNPRD CIRCULATE BOTTOMS UP TO DISPLACE WELL TO 8.4 PPG KCL. MM IN 1.01 BPM/MM OUT.99 BPM @ 760 PSI, NO LOSSES. AS SOON AS THE PUMP RATE WAS INCREASED THE OUT MM REMAINED CONSTANT WITH IN MM. MM OUT MUST HAVE NOT BEEN READING CORRECTLY WHILE PUMPING AT SUCH A LOW RATE. 5/6/2011 00:00 - 00:40 0.67 CASING P RUNPRD CIRCULATE BOTTOMS UP TO DISPLACE WELL TO 8.4 PPG KCL. MM IN 1.01 BPM/MM OUT.99 BPM @ 760 PSI, NO LOSSES. 00:40 - 01:00 0.33 CASING P RUNPRD 8.4 PPG KCl ALL THE WAY AROUND.NO LOSSES. DROP PUMP RATE TO.65 BPM AND STACK 10K DOWN AT 9717.4'. PAINT FLAG. PU TO 9667'TO DROP 5/8"STEEL BALL. Printed 5/25/2011 3:55:06PM ''orth America -ALASKA- BP Page 5 of 6 Operation Summary Report Common Well Name:06-02 AFE No Event Type: COM-ONSHORE(CON) Start Date: 5/3/2011 End Date: 5/7/2011 X3-00YL3-C(1,073,611.00) Project: Prudhoe Bay Site: PB DS 06 Rig Name/No.: NORDIC 1 Spud Date/Time:5/1/1978 12:00:00AM Rig Release: 5/7/2011 Rig Contractor:NORDIC CALISTA UWI:500292028200 Active Datum:2: 02 5/1/1978 00:00 @64.00ft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (ft) 01:00 - 02:40 1.67 CASING P RUNPRD LAUNCH BALL AND PUMP @ 1.0 BPM @ 380PSI. SET PUMP TRIPS AT 500 PSI. BALL NOT ON SEAT AT 60 BBLS. PLAYED WITH PRESSURES ALITTLE BIT AND HEARD BALL IN COIL THEN OVER GOOSE NECK AT 02:20. 02:40 - 02:50 0.17 CASING P RUNPRD BALL ON SEAT 20 BBLS LATE.RIH AND TAG AT 9717.4'.AT PAINTED FLAG. PU TO BREAK OVER+2'(9711').PRESSURE UP TO 1800 PSI TO SET LTP. SET DOWN 10K AT 9715.4'. 02:50 - 03:40 0.83 CASING P RUNPRD PRESSURE UP BACKSIDE AND LOW 1� PRESURE TEST 250 PSI FOR 5MINUTES. HIGH PRESURE TEST 2400 PSI FOR 30 0 MINUTES. GOOD STRAIGHT LINE TEST LOST 10 PSI TOTAL. 03:40 - 06:00 2.33 CASING P RUNPRD POOH 80 FPM HOLDING 200 PSI WELLHEAD PRESSURE. MM IN 1.48 BPM/MM OUT.94 BPM. PIPE DISPLACEMENT.44 BPM. PVT 301 BBLS 06:00 - 06:30 0.50 CASING P RUNPRD OOH. FLOW CHECK WELL. NO FLOW. 06:30 - 07:00 0.50 CASING P RUNPRD LD LTP PACKER RUNNING TOOL. • 07:00 - 07:20 0.33 BOPSUR P POST MU FREEZE PROTECT BHA WITH 3.0"BALL DROP TYPE NOZZLE 07:20 - 07:45 0.42 BOPSUR P POST RIH TO 2500'AND CONCURRENTLY HOLD PJSM WITH LRS PUMPING CREW AND RIG TEAM 07:45 - 09:15 1.50 BOPSUR P POST PUMP 60 BBLS OF 8OF DIESEL FOR FREEZE PROTECT OF WELL. SWAP TO RIG PUMPS AND PIT SYSTEM AND LAY IN FREEZE PROTECT TO SURFACE. 09:15 - 11:00 1.75 BOPSUR P POST OOH. SECURE WELL AND DISPLACE COIL TO 8.4 PPG KCL. BLOW DOWN COIL W/AIR. 11:00 - 11:30 0.50 BOPSUR P POST CLEAR FLOOR AND PREPARE FOR SETTING BPV 11:30 - 12:00 0.50 BOPSUR P POST PJSM WITH BPV CREW AND RIG TEAM. GREASE SWAB VALVE,SSV AND MASTER VALVES. 12:00 - 16:45 4.75 BOPSUR P POST PU BPV LUBRICATOR AND EQUIPMENT. TEST TO 250 PSI LOW AND 3500 PSI HIGH. REPEAT TEST AND CONTINUE TO GREASE VALVES UNTIL HIGH PRESSURE TEST PASSED. 16:45 - 18:15 1.50 BOPSUR P POST SET BPV. RD BPV LUBRICATOR AND EQUIPMENT. 18:15 - 18:50 0.58 BOPSUR P POST CREW CHANGE AND WALK AROUNDS. 18:50 - 19:00 0.17 BOPSUR P POST PJSM TO CALIBRATE SLB INJECTOR WEIGHT CELL. 19:00 - 20:00 1.00 BOPSUR P POST CALIBRATE SLB INJECTOR WEIGHT CELL. 20:00 - 23:30 3.50 BOPSUR P POST PT SSV AND SV THRU WV FOR TWO TESTED BARRIERS TO OPEN BOP RAM DOORS FOR INSPECTION.CHARTED, SIGNED AND PLACED IN WELL FOLDER. Printed 5/25/2011 3:55:06PM "orth America-ALASKA- BP Page 6 of 6 Operation Summary Report Common Well Name:06-02 AFE No Event Type: COM-ONSHORE(CON) Start Date: 5/3/2011 End Date: 5/7/2011 X3-00YL3-C(1,073,611.00) Project:Prudhoe Bay Site: PB DS 06 Rig Name/No.: NORDIC 1 Spud Date/Time:5/1/1978 12:00:00AM Rig Release: 5/7/2011 Rig Contractor: NORDIC CALISTA UWI:500292028200 Active Datum:2: 02 5/1/1978 00:00 @64.00ft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (ft) 23:30 - 00:00 0.50 BOPSUR P POST PJSM TO REMOVE BOP RAM DOORS FOR RAM INSPECTION. 5/7/2011 00:00 - 03:00 3.00 BOPSUR P POST REMOVE BOP RAM DOORS FOR RAM INSPECTION. 03:00 - 06:30 3.50 BOPSUR P POST ND BOPE NU TREE CAP. PT TREE CAP. 06:30 RIG RELEASE. RIG MOVING TO C-42A. Printed 5/25/2011 3:55:06PM BAKER HUGHES INTEQ North America - ALASKA - BP Prudhoe Bay PB DS 06 06-02 - Slot 02 5002920 8200 06-02APBI0 4{6-0 -- i z S-0 tA° Survey: MWD Survey Report - Geographic 27 April, 2011 Qbp Mill BAKER 1111441111 Survey Report-Geographic 0 bp INTEQ Company: North America-ALASKA-BP Local Co-ordinate Reference: Well 06-02-Slot 02 Project: Prudhoe Bay TVD Reference: 2:02 5/1/1978 00:00©64.00ft(generic drilling ri Site: PB DS 06 MD Reference: 2:02 5/1/1978 00:00 @ 64.00ft(generic drilling ri Well: 06-02 North Reference: True Wellbore: 06-02APB1 Survey Calculation Method: "Minimum Curvature Design: 06-02APB1 Database: EDM.16-ANC Prod-WH24P Project Prudhoe Bay,GPB,PRUDHOE BAY Map System: US State Plane 1927(Exact solution) System Datum: Mean Sea Level Geo Datum: NAD 1927(NADCON CONUS) Using Well Reference Point Map Zone: Alaska Zone 04 Using geodetic scale factor Site PB DS 06,TR-10-14 Site Position: Northing: 5,941,880,59ft Latitude: 70°14'46.529 N From: Map Easting: 684,674.88ft Longitude: 148°30'29.224 W Position Uncertainty: 0.00 ft Slot Radius: 0.000 in Grid Convergence: 1.40 ° Well 06-02 API No 500292028200 Well Position +N/-S 0.00 ft Northing: 5,941,201.36 ft Latitude: 70° 14'39.574 N +E/-W 0.00 ft Easting: 685,817.66 ft Longitude: 148°29'56.491 W Position Uncertainty 0.00 ft Wellhead Elevation: ft Ground Level: 37.00 ft Wellbore 06-02APB1 API No 500292028270 Magnetics Model Name Sample Date Declination Dip Angle Field Strength O (°l (nT) BGGM2010 3/9/2011 21.75 80.97 57,657 Design 06-02APB1 Audit Notes: Version: Phase: ACTUAL Tie On Depth: 10,050.00 Vertical Section: Depth From(TVD) +N/-S +E/-W Direction (ft) (ft) (ft) (°) 27.00 0.00 0.00 312.46 Survey Program Date: 4/27/2011 From To (ft) (ft) Survey(Wellbore) Tool Name Description 100.00 10,050.00 Gyro Survey(06-02) GYD-CT-CMS Gyrodata cont.casing m/s 10,055.00 12,150.00 MWD(06-02APB1) MWD MWD-Standard 4/27/2011 10:05:33AM Page 2 COMPASS 2003.16 Build 73 nit BAKER " by HUGHES Survey Report-Geographic f 1NTEQ Company: North America-ALASKA-BP Local Co-ordinate Reference: Well 06-02-Slot 02 Project: Prudhoe Bay TVD Reference: 2:02 5/1/1978 00:00 @ 64.00ft(generic drilling ri Site: PB DS 06 MD Reference: 2:02 5/1/1978 00:00 @ 64.00ft(generic drilling ri Well: 06-02 North Reference: True Wellbore: 06-02APB1 Survey Calculation Method: Minimum Curvature Design: 06-02APB1 Database: EDM.16-ANC Prod-WH24P Survey Measured Vertical Map Map Depth Inclination Azimuth Depth +N/-S +E/-W Northing Easting (ft) (°) (°) (ft) (ft) (ft) (ft) (ft) Latitude Longitude 10,050.00 37.44 343.97 8,630.77 3,455.46 -2,166.01 5,944,602.16 683,567.26 70°15'13.555 N 148°30'59.494 W TIP 10,055.00 37.44 343.97 8,634.74 3,458.38 -2,166.85 5,944,605.06 683,566.35 70°15'13.584 N 148°30'59.519 W KOP 10,085.68 33.80 339.33 8,659.68 3,475.34 -2,172.44 5,944,621.87 683,560.34 70°15'13.751 N 148°30'59.682 W 10,115.76 32.18 334.89 8,684.91 3,490.42 -2,178.79 5,944,636.80 683,553.62 70°15'13.899 N 148°30'59.867 W 10,149.78 32.76 329.81 8,713.62 3,506.58 -2,187.26 5,944,652.74 683,544.75 70°15'14.058 N 148°31'0.113 W 10,182.48 35.30 324.89 8,740.72 3,521.96 -2,197.15 5,944,667.88 683,534.49 70°15'14.209 N 148°31'0.401 W 10,197.02 36.32 322.71 8,752.52 3,528.83 -2,202.18 5,944,674.61 683,529.29 70°15'14.277 N 148°31'0.547 W 10,224.76 38.17 318.92 8,774.60 3,541.83 -2,212.79 5,944,687.35 683,518.37 70°15'14.404 N 148°31'0.856 W 10,262.24 39.77 315.74 8,803.74 3,559.15 -2,228.77 5,944,704.26 683,501.96 70°15'14.575 N 148°31'1.321 W 10,291.84 42.78 312.24 8,825.99 3,572.69 -2,242.82 5,944,717.46 683,487.58 70°15'14.708 N 148°31'1.730 W 10,330.94 43.91 317.85 8,854.43 3,591.67 -2,261.76 5,944,735.97 683,468.18 70°15'14.894 N 148°31'2.281 W 10,368.52 47.96 319.74 8,880.57 3,611.99 -2,279.53 5,944,755.84 683,449.92 70°15'15.094 N 148°31'2.798 W 10,398.70 51.85 316.83 8,900.00 3,629.21 -2,294.90 5,944,772.67 683,434.13 70°15'15.264 N 148°31'3.245 W 10,425.12 54.66 315.80 8,915.81 3,644.52 -2,309.52 5,944,787.61 683,419.13 70°15'15.414 N 148°31'3.671 W 10,459.88 59.37 314.60 8,934.73 3,665.19 -2,330.07 5,944,807.78 683,398.09 70°15'15.617 N 148°31'4.268 W 10,494.06 62.85 309.87 8,951.24 3,685.28 -2,352.23 5,944,827.31 683,375.44 70°15'15.815 N 148°31'4.913 W 10,527.42 65.71 306.26 8,965.72 3,703.80 -2,375.89 5,944,845.24 683,351.33 70°15'15.997 N 148°31'5.602 W 10,558.24 68.40 302.84 8,977.74 3,719.88 -2,399.26 5,944,860.74 683,327.57 70°15'16.155 N 148°31'6.282 W 10,586.02 70.92 300.19 8,987.40 3,733.49 -2,421.47 5,944,873.79 683,305.04 70°15'16.289 N 148°31'6.928 W 10,619.08 73.38 296.22 8,997.53 3,748.35 -2,449.19 5,944,887.97 683,276.96 70°15'16.435 N 148°31'7.734 W 10,647.80 73.75 292.78 9,005.66 3,759.77 -2,474.26 5,944,898.77 683,251.62 70°15'16.547 N 148°31'8.463 W 10,675.54 74.06 289.46 9,013.35 3,769.37 -2,499.11 5,944,907.75 683,226.54 70°15'16.641 N 148°31'9.187 W 10,710.02 70.70 286.63 9,023.79 3,779.56 -2,530.35 5,944,917.16 683,195.06 70°15'16.741 N 148°31'10.095 W 10,739.14 73.43 286.19 9,032.76 3,787.38 -2,556.92 5,944,924.33 683,168.30 70°15'16.818 N 148°31'10.868 W 10,780.30 78.28 284.35 9,042.81 3,797.88 -2,595.41 5,944,933.88 683,129.57 70°15'16.921 N 148°31'11.988 W 10,817.22 83.85 284.12 9,048.55 3,806.85 -2,630.75 5,944,941.97 683,094.02 70°15'17.010 N 148°31'13.016 W 10,852.82 89.20 282.84 9,050.70 3,815.13 -2,665.30 5,944,949.39 683,059.29 70°15'17.091 N 148°31'14.021 W 10,886.66 90.80 279.67 9,050.70 3,821.73 -2,698.48 5,944,955.17 683,025.95 70°15'17.156 N 148°31'14.987 W 10,921.50 93.81 277.96 9,049.30 3,827.07 -2,732.87 5,944,959.66 682,991.44 70°15'17.208 N 148°31'15.987 W 10,951.96 95.56 274.96 9,046.81 3,830.48 -2,763.04 5,944,962.33 682,961.20 70°15'17.241 N 148'31'16.864 W 10,981.80 92.92 272.35 9,044.61 3,832.38 -2,792.73 5,944,963.49 682,931.47 70°15'17.260 N 148°31'17.728 W 11,020.96 92.21 274.25 9,042.85 3,834.63 -2,831.78 5,944,964.78 682,892.38 70°15'17.282 N 148°31'18.864 W 11,049.96 87.88 279.57 9,042.83 3,838.12 -2,860.55 5,944,967.56 682,863.53 70°15'17.316 N 148°31'19.701 W 11,084.74 88.10 284.64 9,044.05 3,845.40 -2,894.53 5,944,974.00 682,829.39 70°15'17.388 N 148°31'20.690 W 11,121.14 88.99 283.57 9,044.98 3,854.27 -2,929.82 5,944,982.00 682,793.89 70°15'17.475 N 148°31'21.716 W 11,151.22 92.03 280.95 9,044.71 3,860.66 -2,959.21 5,944,987.66 682,764.36 70° 15'17.538 N 148°31'22.571 W 11,183.26 90.34 275.80 9,044.05 3,865.32 -2,990.89 5,944,991.54 682,732.58 70° 15' 17.583 N 148°31'23.493 W 11,216.82 91.41 273.18 9,043.53 3,867.95 -3,024.34 5,944,993.34 682,699.08 70° 15'17.609 N 148°31'24.466 W 11,253.98 90.98 268.63 9,042.76 3,868.53 -3,061.47 5,944,993.01 682,661.94 70°15'17.615 N 148°31'25.546 W 11,303.52 92.76 263.78 9,041.14 3,865.26 -3,110.86 5,944,988.52 682,612.65 70° 15'17.582 N 148°31'26.983 W 11,332.76 92.21 260.79 9,039.87 3,861.34 -3,139.81 5,944,983.89 682,583.81 70°15'17.544 N 148°31'27.825 W 11,379.62 88.37 253.99 9,039.64 3,851.11 -3,185.50 5,944,972.54 682,538.38 70°15'17.443 N 148'31'29.154 W 11,415.30 90.06 248.70 9,040.12 3,839.71 -3,219.29 5,944,960.30 682,504.89 70°15'17.330 N 148°31'30.137 W 11,444.82 89.48 245.27 9,040.24 3,828.17 -3,246.45 5,944,948.10 682,478.02 70'15'17.217 N 148'31'30.927 W 11,482.92 87.60 240.75 9,041.21 3,810.89 -3,280.38 5,944,929.99 682,444.53 70°15'17.047 N 148°31'31.913 W 11,508.94 88.68 236.40 9,042.06 3,797.33 -3,302.57 5,944,915.89 682,422.68 70°15'16.913 N 148°31'32.559 W 11,545.12 90.37 231.52 9,042.36 3,776.05 -3,331.81 5,944,893.90 682,393.97 70°15' 16.704 N 148°31'33.409 W 11,582.16 89.85 223.07 9,042.29 3,750.95 -3,359.01 5,944,868.14 682,367.41 70°15'16.457 N 148'31'34.200 W 11,612.72 90.46 217.86 9,042.21 3,727.71 -3,378.83 5,944,844.42 682,348.16 70°15'16.228 N 148°31'34.776 W 11,647.08 90.89 210.97 9,041.80 3,699.39 -3,398.24 5,944,815.62 682,329.46 70°15'15.950 N 148'31'35.340 W 11,678.28 89.88 206.37 9,041.59 3,672.02 -3,413.20 5,944,787.90 682,315.18 70°15'15.680 N 148°31'35.775 W 11,705.20 88.74 201.31 9,041.91 3,647.41 -3,424.08 5,944,763.03 682,304.91 70°15'15.438 N 148°31'36.091 W 11,740.68 89.08 194.64 9,042.59 3,613.68 -3,435.02 5,944,729.05 682,294.81 70°15'15.107 N 148°31'36.409 W 4/27/2011 10:05:33AM Page 3 COMPASS 2003.16 Build 73 OMER NVGW ES Survey Report-Geographic 0 by INTEQ Company: North America-ALASKA-BP Local Co-ordinate Reference: Well 06-02-Slot 02 Project: Prudhoe Bay ND Reference: 2:02 5/1/1978 00:00 @ 64.00ft(generic drilling ri Site: PB DS 06 MD Reference: 2:02 5/1/1978 00:00©64.00ft(generic drilling ri Well: 06-02 North Reference: True Wellbore: 06-02APB1 Survey Calculation Method: Minimum Curvature Design: 06-02APB1 Database: EDM.16-ANC Prod-WH24P Survey Measured Vertical Map Map Depth Inclination Azimuth Depth +N/-S +EI-W Northing Easting (ft) (°) (°) (ft) (ft) (ft) (ft) (ft) Latitude Longitude 11,784.54 94.21 188.95 9,041.33 3,570.80 -3,443.98 5,944,685.96 682,286.91 70°15'14.685 N 148°31'36.669 W 11,818.44 93.99 186.70 9,038.91 3,537.30 -3,448.58 5,944,652.36 682,283.13 70°15 14.355 N 148°31'36.802 W 11,860.72 91.63 192.73 9,036.83 3,495.70 -3,455.71 5,944,610.60 682,277.04 70°15'13.946 N 148°31'37.009 W 11,905.50 89.85 197.49 9,036.25 3,452.49 -3,467.38 5,944,567.11 682,266.44 70°15'13.521 N 148°31'37.348 W 11,938.14 93.65 198.52 9,035.26 3,421.47 -3,477.46 5,944,535.85 682,257.12 70°15'13.216 N 148°31'37.641 W 11,967.56 100.42 198.27 9,031.66 3,393.78 -3,486.67 5,944,507.95 682,248.60 70°15'12.944 N 148°31'37.908 W 12,000.86 104.14 198.35 9,024.57 3,362.89 -3,496.89 5,944,476.82 682,239.15 70°15 12.640 N 148°31'38.205 W 12,036.58 104.65 192.39 9,015.69 3,329.55 -3,506.05 5,944,443.26 682,230.80 70°15'12.312 N 148°31'38.471 W 12,067.58 102.09 188.32 9,008.52 3,299.89 -3,511.47 5,944,413.48 682,226.12 70°15'12.020 N 148°31'38.628 W 12,098.78 97.60 183.80 9,003.18 3,269.33 -3,514.70 5,944,382.86 682,223.64 70°15'11.720 N 148°31'38.722 W 12,150.00 97.60 183.80 8,996.41 3,218.68 -3,518.07 5,944,332.13 682,221.53 70°15'11.221 N 148°31'38.819 W TD 41272011 10:05:33AM Page 4 COMPASS 2003.16 Build 73 In.■ BAKER HUGHES INTEQ North America - ALASKA - BP Prudhoe Bay PB DS 06 06-02 - Slot 02 500292028200 06-Q2A Survey: MWD Survey Report - Geographic 09 May, 2011 Øbp FSkill ROOKER Survey Report-Geographic 0 bp INTEQ Company: North America-ALASKA-BP Local Co-ordinate Reference: Well 06-02-Slot 02 Project: Prudhoe Bay ND Reference: 2:02 5/1/1978 00:00 @ 64.00ft(generic drilling ri Site: PB DS 06 MD Reference: 2:02 5/1/1978 00:00 @ 64.00ft(generic drilling ri Well: 06-02 North Reference: True Wellbore: 06-02A Survey Calculation Method: Minimum Curvature Design: 06-02A Database: EDM.16-ANC Prod-WH24P Project Prudhoe Bay,GPB,PRUDHOE BAY Map System: US State Plane 1927(Exact solution) System Datum: Mean Sea Level Geo Datum: NAD 1927(NADCON CONUS) Using Well Reference Point Map Zone: Alaska Zone 04 Using geodetic scale factor Site PB DS 06,TR-10-14 Site Position: Northing: 5,941,880.59ft Latitude: 70°14'46.529 N From: Map Easting: 684,674.88ft Longitude: 148°30'29.224 W Position Uncertainty: 0.00 ft Slot Radius: 0.000 in Grid Convergence: 1.40 ° Well 06-02 API No 500292028200 Well Position +N/-S 0.00 ft Northing: 5,941,201.36 ft Latitude: 70°14'39.574 N +E/-W 0.00 ft Easting: 685,817.66 ft Longitude: 148°29'56.491 W Position Uncertainty 0.00 ft Wellhead Elevation: ft Ground Level: 37.00 ft Wellbore 06-02A API No 500292028201 Magnetics Model Name Sample Date Declination Dip Angle Field Strength (°) (°) (nT) BGGM2010 4/28/2011 21.68 80.97 57,656 Design 06-02A Audit Notes: Version: 1.0 Phase: ACTUAL Tie On Depth: 10,459.88 Vertical Section: Depth From(ND) +N/-S +E/-W Direction (ft) (ft) (ft) (°) 27.00 0.00 0.00 327.02 Survey Program Date: 5/4/2011 From To (ft) (ft) Survey(Wellbore) Tool Name Description 100.00 10,050.00 Gyro Survey(06-02) GYD-CT-CMS Gyrodata cont.casing m/s 10,055.00 10,459.88 MWD(06-02APB1) MWD MWD-Standard 10,490.00 11,450.00 MWD(06-02A) MWD MWD-Standard 5/9/2011 10:36:01AM Page 2 COMPASS 2003.16 Build 73 HUGHES Survey Report- Geographic 0 bp INTEQ Company: North America-ALASKA-BP Local Co-ordinate Reference: Well 06-02-Slot 02 Project: Prudhoe Bay TVD Reference: 2:02 5/1/1978 00:00 @ 64.00ft(generic drilling ri Site: PB DS 06 MD Reference: 2:02 5/1/1978 00:00 @ 64.00ft(generic drilling ri Well: 06-02 North Reference: True Wellbore: 06-02A Survey Calculation Method: Minimum Curvature Design: 06-02A Database: EDM.16-ANC Prod-WH24P Survey Measured Vertical Map Map Depth Inclination Azimuth Depth +N/-S +E/-W Northing Easting (ft) (°) (°) (ft) (ft) (ft) (ft) (ft) Latitude Longitude 10,459.88 59.37 314.60 8,934.73 3,665.19 -2,330.07 5,944,807.78 683,398.09 70° 15'15.617 N 148°31'4.268 W TIP 10,490.00 62.43 310.42 8,949.38 3,682.96 -2,349.47 5,944,825.06 683,378.26 70°15'15.792 N 148°31'4.833 W KOP 10,513.76 59.13 300.97 8,960.99 3,695.06 -2,366.26 5,944,836.74 683,361.17 70°15'15.911 N 148°31'5.322 W 10,538.70 57.75 296.36 8,974.05 3,705.25 -2,384.90 5,944,846.47 683,342.29 70°15'16.011 N 148°31'5.864 W 10,572.74 55.92 288.51 8,992.69 3,716.13 -2,411.20 5,944,856.70 683,315.73 70°15 16.118 N 148°31'6.629 W 10,602.84 62.37 284.03 9,008.13 3,723.33 -2,435.99 5,944,863.28 683,290.77 70°15'16.189 N 148°31'7.350 W 10,630.74 67.40 279.59 9,019.97 3,728.48 -2,460.70 5,944,867.82 683,265.94 70°15 16.239 N 148°31'8.069 W 10,666.18 75.08 274.15 9,031.37 3,732.45 -2,493.98 5,944,870.97 683,232.57 70°15 16.278 N 148°31'9.037 W 10,692.82 80.18 268.01 9,037.08 3,732.93 -2,519.98 5,944,870.80 683,206.58 70°15 16.283 N 148°31'9.793 W 10,726.52 87.32 262.48 9,040.75 3,730.14 -2,553.33 5,944,867.20 683,173.31 70° 15 16.255 N 148°31'10.763 W 10,757.22 87.27 266.87 9,042.20 3,727.30 -2,583.85 5,944,863.60 683,142.86 70°15'16.227 N 148°31'11.651 W 10,785.98 92.98 271.18 9,042.13 3,726.81 -2,612.59 5,944,862.40 683,114.15 70°15 16.222 N 148°31'12.487 W 10,815.78 90.86 276.11 9,041.14 3,728.70 -2,642.30 5,944,863.56 683,084.40 70°15'16.241 N 148°31'13.351 W 10,845.90 91.26 284.74 9,040.58 3,734.15 -2,671.89 5,944,868.28 683,054.69 70°15'16.294 N 148°31'14.212 W 10,875.84 89.94 292.59 9,040.26 3,743.72 -2,700.23 5,944,877.15 683,026.12 70°15'16.388 N 148°31'15.037 W 10,906.08 89.79 301.09 9,040.33 3,757.36 -2,727.19 5,944,890.12 682,998.84 70°15'16.522 N 148°31'15.821 W 10,935.84 89.57 307.28 9,040.50 3,774.07 -2,751.80 5,944,906.22 682,973.83 70°15'16.687 N 148°31'16.537 W 10,963.62 88.99 304.98 9,040.85 3,790.45 -2,774.23 5,944,922.04 682,951.00 70°15'16.848 N 148°31'17.190 W 10,996.00 88.74 300.33 9,041.49 3,807.91 -2,801.48 5,944,938.82 682,923.33 70°15'17.019 N 148°31'17.983 W 11,027.06 92.58 292.10 9,041.13 3,821.62 -2,829.31 5,944,951.84 682,895.17 70'15'17.154 N 148°31'18.792 W 11,054.68 91.10 287.62 9,040.25 3,831.00 -2,855.27 5,944,960.57 682,868.99 70° 15'17.246 N 148°31'19.547 W 11,087.42 89.66 281.84 9,040.03 3,839.32 -2,886.92 5,944,968.11 682,837.15 70° 15'17.328 N 148°31'20.468 W 11,115.34 90.92 276.74 9,039.89 3,843.82 -2,914.46 5,944,971.93 682,809.50 70° 15'17.372 N 148°31'21.269 W 11,150.46 88.34 271.81 9,040.11 3,846.44 -2,949.47 5,944,973.69 682,774.44 70° 15'17.398 N 148°31'22.288 W 11,180.14 88.62 263.15 9,040.90 3,845.14 -2,979.08 5,944,971.65 682,744.87 70°15'17.385 N 148°31'23.149 W 11,210.22 88.68 255.75 9,041.61 3,839.63 -3,008.62 5,944,965.42 682,715.48 70° 15'17.331 N 148°31'24.009 W 11,240.18 89.29 248.34 9,042.14 3,830.41 -3,037.10 5,944,955.50 682,687.24 70°15'17.240 N 148°31'24.837 W 11,270.16 90.46 240.04 9,042.21 3,817.36 -3,064.07 5,944,941.80 682,660.61 70°15'17.111 N 148°31'25.621 W 11,300.24 91.10 232.91 9,041.80 3,800.76 -3,089.12 5,944,924.58 682,635.97 70°15'16.948 N 148°31'26.350 W 11,330.22 91.20 227.75 9,041.20 3,781.64 -3,112.19 5,944,904.89 682,613.38 70°15'16.760 N 148°31'27.020 W 11,360.40 90.31 219.32 9,040.80 3,759.78 -3,132.96 5,944,882.53 682,593.16 70°15'16.545 N 148°31'27.624 W 11,390.16 89.29 214.65 9,040.90 3,736.01 -3,150.85 5,944,858.34 682,575.86 70°15'16.311 N 148°31'28.145 W 11,405.16 88.86 212.76 9,041.15 3,723.54 -3,159.18 5,944,845.66 682,567.84 70°15'16.188 N 148'31'28.387 W 11,450.00 88.86 212.76 9,042.04 3,685.84 -3,183.44 5,944,807.37 682,544.52 70'15'15.817 N 148°31'29.092 W TD-2 7/8" 5/9/2011 10.36.01AM Page 3 COMPASS 2003.16 Build 73 suga o [--r SEAN PARNELL, GOVERNOR ALASKA OIL AND GAS 333 W.7th AVENUE,SUITE 100 CONSERVATION COMMISSIONANCHORAGE,ALASKA 99501-3539 PHONE (907)279-1433 FAX (907)276-7542 John McMullen Engineering Team Leader BP Exploration (Alaska), Inc. P.O. Box 196612 Anchorage, AK 99519-6612 Re: Prudhoe Bay Field, Prudhoe Bay Oil Pool, PBU 06-02A BP Exploration (Alaska), Inc. Permit No: 211-026 Surface Location: 607' FSL, 1164' FEL, SEC. 02, T1ON, R14E, UM Bottomhole Location: 2161' FNL, 673' FWL, SEC. 02, T1ON, R14E, UM Dear Mr. McMullen: Enclosed is the approved application for permit to re-drill the above referenced development well. This permit to drill does not exempt you from obtaining additional permits or an approval required by law from other governmental agencies and does not authorize conducting drilling operations until all other required permits and approvals have been issued. In addition, the Commission reserves the right to withdraw the permit in the event it was erroneously issued. Operations must be conducted in accordance with AS 31.05 and Title 20, Chapter 25 of the Alaska Administrative Code unless the Commission specifically authorizes a variance. Failure to comply with an applicable provision of AS 31.05, Title 20, Chapter 25 of the Alaska Administrative Code, or a Commission order, or the terms and conditions of this permit may result in the revocation or suspension of the permit. Sincerely, 4)./4 Daniel T. Seamount, Jr. / Chair DATED this 4.-'clay of February, 2011. cc: Department of Fish 86 Game, Habitat Section w/o encl. (via e-mail) Department of Environmental Conservation w/o.encl. (via e-mail) STATE OF ALASKA RECEM" , ALA OIL AND GAS CONSERVATION COM! 'ION ..Ase1/- PERMIT TO DRILL FEB 15 2011 ..?-/.4.-// 20 AAC 25.005 1 a.Type of work: lb.Proposed Well Class: ®Development Oil 0 Service-Winj 0 Single Zone IMnigAiniggiOA ❑ Drill ®Redrill 0 Stratigraphic Test 0 Development Gas 0 Service-Supply 0 Multiple Zone 0 CoalbeAffen i,r i�: .s Hydrates ❑ Re-Entry 0 Exploratory 0 Service-WAG 0 Service-Disp r ale Gas 2. Operator Name: 5.Bond: ®Blanket 0 Single Well 11. Well Name and Number: BP Exploration(Alaska)Inc. Bond No. 6194193 PBU 06-02A 3. Address: 6. Proposed Depth: 12.Field/Pool(s): P.O.Box 196612,Anchorage,Alaska 99519-6612 MD 12900' TVD 895Tss Prudhoe Bay Field/Prudhoe 4a. Location of Well(Governmental Section): 7. Property Designation(Lease Number): Bay Oil Pool Surface: ADL 028311 607'FSL, 1164'FEL, SEC.2,T1ON, R14E, UM Top of Productive Horizon: 8. Land Use Permit: 13. Approximate Spud Date: 1253'FNL, 1899'FWL,SEC.2,T1ON,R14E, UM April 15,2011 Total Depth: 9.Acres in Property: 14.Distance to Nearest Property: 2161'FNL,673'FWL,SEC.2,T1ON,R14E,UM 2560 24130' 4b. Location of Well(State Base Plane Coordinates-NAD 27): 10.KB Elevation above MSL: 64 feet 15.Distance to Nearest Well Open Surface: x- 685818 y-5941201 Zone- ASP4 GL Elevation above MSL: feet to Same Pool: 628' 16.Deviated Wells: Kickoff Depth: 10069 feet 17.Maximum Anticipated Pressures in psig(see 20 AAC 25.035) Maximum Hole Angle: 104 degrees Downhole: 3195 Surface: 2315 18. Casing Program: Specifications Top-Setting Depth-Bottom Quantity of Cement,c.f.or sacks Hole Casing Weight Grade Coupling Length MD TVD MD TVD (including stage data) 4-1/4" 3-1/276-3/16"x2-7/8"93a/62#/6161 L-80STIC,T,C-111 3150' 9750' 8390' 12900' 895Tss 184 sx 15.8 oma Class'G' ✓ — 19. PRESENT WELL CONDITION SUMMARY(To be completed for Redrill and Re-entry Operations) Total Depth MD(ft): Total Depth TVD(ft): Plugs(measured): Effective Depth MD(ft): Effective Depth TVD(ft): Junk(measured): 10835 9240 None 10777 9201 None Casing Length Size Cement Volume MD TVD Conductor/Structural 118' 20" 269 sx Permafrost 118' 118' Surface 2695' 13-3/8" 7200 sx Arcticset II 2695' 2695' Intermediate Production 10820' 9-5/8" 1200 sx Class'G' 10820' 9235' Liner Tie-Back Liner 9593' 7" 835 sx Class'G' Surface-9593' Surface-8263' Scab Liner 747' 3-1/2" 121 sx Latex Class'G' 9773'-10520' 8409'-9001' Perforation Depth MD(ft): 10510'-10566' Perforation Depth ND(ft): 8993'-9036' 20.Attachments: 0 Property Plat ®BOP Sketch ®Drilling Program 0 Time vs Depth Plot 0 Shallow Hazard Analysis ®Diverter Sketch 0 Seabed Report ®Drilling Fluid Program 0 20 AAC 25.050 Requirements 21. Verbal Approval: Commission Representative: Date: 22. I hereby certify that the/.regoi , is true and correct. Contact Zach Sayers,564-5790 Printed Name J. �(-,f ,:,;J Title Engineering Team Leader /7i 40/ 1f Prepared By NamefN miber Signature f . Phone 564-4711 Date ��7 A Elizabeth Barker,564-5674 Commission Use Only Permit To Drill API Number. Permitroyal Cate: See cover letter for Number. /fa�‘ 50-029-20282-01-00 � c, J f other requirements Conditions of Approval: If box is checked,well may not be used to explore for,test,or produce coal methane,gas hydrates,or gas contained shales: d Other. )K .3SG►D S ` i3oP S/ Samples Req'd /� D- - ! '" 1 eq' : Oyes �No Mud Log Req'd: 0 Yes idNo k z S—� / S A.1 n k,A, c C 7 ( H2S�asures: NI 0 No Directional Survey Req'd: 'Yes 0 No 211.57/ Z C / / Date -0 / APPROVED BY THE COMMISSION ,COMMISSIONER Form 10-401 Revised 7/2009 This permit is valid for 24 months from the date of a I(20 AAC 25.005(g)) Submit In Duplicate 2 2'!•!! ar.44#..v..__y OR1G1NAL To: Alaska Oil & Gas Con-Nation Commission From: Zach Sayerss0 0 b CTD Engineer Date: February 4, 2011 Re: 06-02A Permit to Drill request Approval is requested for a permit to drill a CTD sidetrack from well 06-02. CTD Drill and Complete 06-02A program: Spud April 15th, 2011 Pre-Rig Work: (scheduled to begin March 1st, 2011) 1. S Drift and tag fill 2. E Set CIBP at 10,120' MD 3. E Chemical cut tubing at 10,090' MD 4. C PU 3-%" tubing stub to ensure it is free 5. C Freeze protect the well 6. 0 Bleed wellhead pressures down to zero. 7. 0 Bleed production flow lines and GL lines down to zero and blind flange 8. 0 Remove wellhouse, level pad Rig Work: (scheduled to begin -April 15th, 2011) 1. MIRU and test BOPE to 250 psi low and 3,500 psi high. 2. Make nozzle run to 9,770' MD and Swap well to 2% 8.4 ppg KCI 3. Pull 3-'/2" liner stub (-300') from 9,773' MD 4. Mill out XN Nipple at 9,778' to 3.80" 5. Set 25 bbl, 17 #/gal cement plug in 9-5/8" up to 4-%" tubing tail 6. Drill 3.8" pilot hole from top of cement at 9,799' down to 10,080'. 7. Set 3-5/8" whipstock 8. Mill 3.8" window at 10,054' and 10' of rathole in Zone 2. Swap the well to Geo-Vis. 9. Drill Build: 4.125" OH, 150' (20 deg/100 planned) 10. Drill Lateral: 4.125" OH, 2,800' (12 deg/100 planned) with resistivity ;5 11. Run 3-1/2" x 3-3/16" x 2-7/8" tapered L-80 liner leaving TOL at 9,750' P-p 12. Pump primary cement leaving TOC at 9,750', 38 bbls of 15.8 ppg liner cmt planned 13. Cleanout liner and MCNL/GR/CCL log 14. Perforate liner per asset instructions (-1,000') 15. Set 4-W liner top packer, and test to 2,400 psi 16. Freeze protect well, set BPV, RDMO. Post-Rig Work: 1. Re-install wellhouse, flowline and pull BPV. 2. Generic GLV's 3. Test separator Mud Program: • Well kill: 8.4 ppg brine. • Milling/drilling: 8.6 ppg Geo Vis for milling window and drilling. Disposal: • All drilling and completion fluids and all other Class II wastes will go to Grind & Inject. ' • All Class I wastes will go to Pad 3 for disposal. Hole size: 4-1/4" Casing Program: • 3-1/2", 9.3#, L-80, STL 9,750' MD —9,800' MD • 3-3/16", 6.2#, L-80, TC-II 9,800' MD— 11,100' MD • 2-7/8", 6.16#, L-80, STL 11,100' MD - 12,900' MD • A minimum of 38 bbls of 15.8 ppg cement will be used for liner cementing. (TOC 9,750' MD) Well Control: • BOP diagram is attached. • Pipe rams, blind rams and the CT pack off will be pressure tested to 250 psi and to 3,500 psi. • The annular preventer will be tested to 250 psi and 2,500 psi. Directional • See attached directional plan. Maximum planned hole angle is 104°. • Magnetic and inclination surveys will be taken every 30 ft. No gyro will be run. • Distance to nearest property—24,130'. • Distance to nearest well within pool —628' to 14-33. Logging • MWD directional, Gamma Ray and Resistivity will be run over all of the open hole section. • Cased hole GR/CCL/MCNL logs will be run. Anti-Collision Failures • None. Hazards • The maximum recorded H2S level on Drill Site 06 pad was 395 ppm on well 06-09 on 8/2/1987. • Lost circulation risk is considered moderate for the fault block drilled in 06-02A. Reservoir Pressure • The reservoir pressure on 06-02A is expected to be 3,195 psi at 8,800' TVDSS. (7.0 ppg equivalent). • Maximum expected surface pressure with gas (0.10 psi/ft) to surface is 2,315 psi. Zach Sayers CTD Engineer CC: Well File Sondra Stewman/Terrie Hubble TREE= FMC GEN 1 WELLHEAD= FMC SA. NOTES: OBSTRUCTION AT 10725" ACTUATOR= AXELSON 06-02 (01/24/90)***CHROME TBG&LNR*** KB.ELEV= 64' BF.ELEV= KOP= 3200' Max Angle= 46 @ 5200' Datum MD= 10363' ' 2121' —14-1/2"HES X NIP,ID=3.813" Datum TVD= 8800'SS 2316' —9-5/8"FOC 20"CONDUCTOR,94#,H-40,ID=? H 100' - L- 2441' —I 9-5/8"FOC 13-3/8"CSG,72#,J&L N-80,ID=12.347" — 2695' I ♦ ►♦ 3150' —EST TOP OF CEMENT(07/19/03 RWO) 1� • ► GAS LIFT MANDRELS • ►# ST MD TVD DEV TYPE VLV LATCH PORT DATE 1• 4 3529 3517 17 KBG-2 DMY BK 0 11/10/10 1• 3 6788 5985 41 KBG-2 DMY BK 0 11/10/10 ►# 2 8410 7285 36 KBG-2 DMY BK 0 07/19/03 Minimum ID = 2.972" @ 9778' ►• 1 9408 8102 35 KBG-2 DMY BK 0 07/19/03 BAKER FLUTTED NO-GO • F 9466' 4-1/2"HESXNIP, ID=3.813" • �� 9487' I—7"X 4-1/2"BKR S-3 PKR, ID=3.875" • • �1 9511' —{4-1/2"HES X NIP,ID=3.813" ' ►� 7"TIEBK LNR,26#,L-80 BTC-M, — 9593' ►1 .0383 bpf,ID=6.276" • ►� L. 9773' I—3.70"BKR DEPLOY SLV 4-1/2"TBG, 12.6#,13CR VAM ACE, —I 9799' • w/4"GS PROF, ID=3.00" .0152 bpf,ID=3.958" 9778' H BKR FLUTTED NO-GO, ID=2.972" PERFORATION SUMMARY 1 9778' H4-1/2"HES XN NIP,ID=3.725" REF LOG:BHCS ON 05/20/78 BEHIND ANGLE AT TOP PERF:39 @ 10510' - 9800' 14-1/2"WLEG,ID=3.958" LNR Note:Refer to Production DB for historical perf data 9800' -ELMD TT LOGGED 11/23/03 SIZE SPF INTERVAL Opn/Sqz DATE ? ? 10415-10440 S 07/05/85 ? ? 10449-10456 S 07/05/85 9899' CASING HOLE 9898'-9929' 2-5/8" 2 10455-10469 S 01/22/90 1 (RIG SQZ 01/22/90) 3-1/8" 1/2 10456-10470 S 01/22/90 ••••4 ►•�•, 3-3/8" 6 10484- 10496 S 01/22/90 •••• ► •• 10114' HEST TOP OF CEMENT •2-1/8" 4 10498- 10506 S 08/17/94 •••• j•�•�- 3-3/8" 6 10510- 10528 S 01/22/90 � • •�• ►•••• 2-5/8" 4 10510-10528 S 02/13/90 •�•� j•�•� 2-1/2" 6 10510-10528 0 08/08/05 �•�• ►••••• •• ►•• 2-1/2" 5 10556-10566 0 08/07/05 •••• ►•••• 3-3/8" 6 10556-10574 S 01/22/90 •••• ►•••� •�•� ►•• 2-5/8" 4 10556-10574 S 02/13/90 •••• •••• 3-1/2"LNR,9.3#, 13CR STL,.0087 bpf, ID=2.992" H 10520' •••< ,•t•t 10522' —3-1/2"BKR LANDING COLLAR PBTD(08/07/05) 1 10567' ELMD a DRILLED/MILLED OUT 7/3/05 9-5/8"CSG,47#, RS-95/NT-80 BUTT, H 10820' 10567' ELMD I UNKNOWN SOLID HARD FILL / ID=8.681" •�•�•�•�•�•�•�•�•�•�•4 (TAGGED 08/07/05) EH 10835' 6.44.4144.....0.4. DATE REV BY COMMENTS DATE REV BY COMMENTS PRUDHOE BAY UNIT 10/30/78 N1 ES ORIGINAL COMPLETION 11/14/10 CJN/AGR GLV C/O(11/10/10) WELL: 06-02 01/30/90 AUDI 4 RWO PERMIT No: 1770780 07/19/03 N4ES RWO API No: 50-029-20282-00 06/11/05 JGM/PJC CTU 9 3-1/2"LNR } SEC 2,T10N,R14E,3500.19'FEL&751.24'FNL 10/01/07 AMS/PJC 3-1/2"LNR CORRECTIONS 11/16/09 TAQ/PJC CMT TOP CORRECTIONS BP Exploration(Alaska) TREE= FMC GEN 1 WELLHEAD= FMC SANOTES: OBSTRUCTION AT 10725" ACTUATOR= AXELSON O �O (01/31.0)***CHROME TBG&LNR*** KB.ELEv= 64' Proposed CTD sidetrack BF.ELEV= KOP= 3200' OA x OOA communication - limit to 500psi ,Max Angle= 46 @ 5200' Datum MD= 10363' I 2121' H HES X NP,ID=3.813" Datum TVD= 8800'SS 2316' —I9-5/8"FOC I20"CONDUCTOR,94#,H-40,ID=? — 100' , 2441' —I9-5/8"FOCI 13-3/8"CSG,72#,J&L N-80,ID=12.347" —I 2695' r, r, 3150' —1 EST TOP OF CEMENT(07/19/03 RWO) •1• 1.1• �• 4 V GAS LIFT MANDRELS i.4 141 ST MD ND DEV TYPE VLV LATCH PORT DATE P4 114 4 3529 3517 17 KBG-2 DMY BK 0 11/10/10 •4 1�4 3 6788 5985 41 KBG-2 DMY BK 0 11/10/10 •4 92 8410 7285 36 KBG-2 DMY BK 0 07/19/03 Minimum ID =2.972" @ 9778' 1/ ►�; 1 9408 8102 35 KBG-2 DMY BK 0 07/19/03 BAKER FLUTTED NO-GO .. 10 .• �‘� 9466' H4-1/2"HES X NIP,ID=3.813" I t1 1*4 74�� V9487' —T'X 4-1/2"BKR S-3 PKR,ID=3.875" I J 9511' H41/2"HES X NIP,ID=3.813" I 7"11EBK LNR,26#,L-80 BTC-M, — 9593' \0 .0383 bpf,D=6.276" 4-1/2"TBG,12.6#,13CR VAM ACE,.0152 bpf,ID=3.958" 9799' - -Liner top Packer- 9740' TSGR -- 9900' TOL and TOC - 9750' 9778' H4-1/2"HES XN NP,ID=3.8" I 3-112"TBG,9.3#,L-80,STL — 9799' kb, 111 ..._o 9800' 4-112"WLEG,ID=3.958" I PERFORA TION SUMMARY9800' ELMD6:00.7/2:901)1/23/03 REF LOG: BHCS ON 05/20/78 9899' I CASIO98'-9929' A NGLE AT TOP PERF:39 @ 10510' (RI Note:Refer to Production DB for historical perf data TOW at 10,054' SIZE SPF INTERVAL Opn/Sqz DATE Z4 exi i 3-3/16 x 2-7/8" XO - 11,100 ? 7 10415-10440 S 07/05/85 37 deg , `/ 7 7 10449-10456 S 07/05/85 1 2-5/8" 2 10455-10469 S 01/22/90 Lowside Pilot hole to 10,080' TD - 12900' 3-1/8" 1/2 10456-10470 S 01/22/90 3-3/8" 6 10484-10496 s 01/22/90 "•'•3 ;•�••! --Cut tubing - 10,090' ••• •• 2-1/8" 4 10498-10506 S 08/17/94 ►••••1 • • 10108' I—ITOC from 11/19!10 CBLI 3-3/8" 6 10510-10528 S 01/22/90 •••••4 WI2-S/8" 4 10510-10528 S 02/13/90 tr••�•� 0••••• 3-1/2" C I B P - 10,120' 2-1/2" 6 10510-10528 0 08/08/05 ►••••4 ►•••• ► ••••4 ►•••• 2-1/2" 5 10556-10566 0 08/07/05 ••t 3-3/8" 6 10556-10574 S 01/22/90 ►••••� •♦•4 m • 2-5/8" 4 10556-10574 S 02/13/90 0 4 ,*�_•�4 10522' I—I3-1/2"BKR LANDING COLLAR �•�•�� �• I. DRILLED/MILLED OUT 7/3/05 3-1/2"LNR,9.3#, 13CR STL, .0087 bpf,ID=2.992" H 10520' PBTD(08/07/05) — 10567' ELMDI 10567' ELMDUNKNOWN SOLID HARD FILL 1414vv•4••• (TAGGED 08/07/05) 9-5/8"CSG,47#, RS-95/NT-80 BUTT, ID=8.681" — .1 10820' .4...4...44.4.4.'.. J 10835' 4. DATE REV BY COMMENTS DATE REV BY COMMENTS PRUDHOEBAY UNIT 10/30/78 NIES ORIGINAL COMPLETION _11/14/10 CJN/AGR GLV C/O(11/10/10) WELL: 06-02 01/30/90 AUDI 4 RWO PERMIT No: 1770780 07/19/03 N4ES RWO API No: 50-029-20282-00 06/11/05 JGM/PJC CTU 9 3-1/2"LNR SEC 2,T10N,R14E,3500.19'FEL&751.24'FNL 10/01/07 AMS/PJC 3-1/2"LNR CORRECTIONS 11/16/09 TAQ/PJC CMT TOP CORRECTIONS BP Exoloration lAlaskal . . . . . . . . C.) rl 2 72' . z4 � / = 2 0 ) § \ \ � § e a § w n § 0 ! f % a & , y \ � m}C) \$ N- CD I ® ® o © f } _ / Q_ \ \ ..... -711 735 = e U) .. ) R -CI : e ) ) a g 2 $ k \ / S cu En e ) k j _j & .11.; a% / § 2 kk� 1.0 co $ 2 ; \ \ � n / 2 2� § ; ; 0k E- .- as 2@e0 0 ƒ CD 0e , a - .. 0 G • ..— E _ = _ / § Ce © . © \ / 2Zco � en \ / � CD7 = N 2 cq [o §\ $ co eL 1 r .Ct / / 0) © �� 0 k a) I— 0 5 k 3 # _ 0 o g ■ � £ j a. B $ ® C CD 1 ƒ §] % f f c � � c ~ co 022 2 c . ZW � # ) § a zwJ I 9 2 z £ § z } C , o• - 0 § E 2 c. § — } \e 0 2£ ) b CO \/ co , o \o . § co\ 00C \ ƒ %j th \ 000 0 ) \< } Cl) ° C < ) \ % E . _ / , 0 ` co /co (5 (5 = o 0 ƒ E 0) 0 0 ' ] f # s k \ SR ) \ 7Z TC & 9 + ■ ) 0_ E § § E co ■ ® cok @- k ; : \ k § I c . ■ a . ' ' e e a ' Mala o E •- E ; § ] o z § ] J �a) •• £oma � - - . et e � � . G 1� § / § s � / oo � ' a a § ) _ = f c u) -o t % A o � m3 ■ o 2 � 2 , � � � � ( ( £ C < > > g . . . . . . . . CO N 0 0 0 0 0 Ni 0 0 0 0 0 0 0 0 0 N. Q C 0 0 0 0 0 N V' 0 0 0 O 0 O 0 0 0 D co O O O O O) N 0 0 0 O O O O O O C N CO CO c0 CO m m 0 43 RI e co U F M C caO d N CO) (o c0 CD N CO CO M VINO N O O I` CO O 0) o I r 6) N M W NT •- O CO O N N O CO N V a O x- N n CO W N c0 7 n O 0 00 W c 4 N N NT NY 7 N N Z CO0) CO O 0 CD U CO CD 0) CO m O) 0) 0) 0) m O a0 a0 a0 00 r o j O O ? a` _ o o 0.) co m O (/) d N Z CO 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 J CO 7 < 0 0 0 0 0 0 0 0 0 0 O O O 0 0 0 coCV - U c O O O N N N N N N N N N N N N N d CO (/) ((7 j 0 S O N d ca co 7 C Lp 0 .2 NI- W dj CO. CO CO O) CO N CO r 0 N- CO CO CO N CO U .a N LL, CO CO O O 01 7 .- CO f- O) CD 0 N U) C N.: CO M 0 0 CO CO CO M6 01 n M O (D ` .c CO CO 0 COC) CO to CO CO CO NT N W n CO NT NY d _ to CO ( CO LO NT 7 NT CO N N ,- ,- 0 0) ad d c M M M M M M M M M M M M M M M N W co co CO CO W co W co W CO CO CO CO CO co C •� �j.' (D CO CD (0 CO CO (D CO CO CO CD 0 CD CO f0 CD d • O W C 0 U R U d c :p c U ` 3 O ` C d U (D O OD 0 N C() 0 n N 0 CO CO CO O d w, ip E sr O O n CO n O CO C.-- 0 CD x- CO 0 U w d d U 0 N st N O N N N CD M N. (D o) CA N CO U) r- Ce >. co p) co O N CO h 0 0 V a0 M O V f� m ce d co co CD co (O (D n N r r W CO T CO CO 0) 15 R' Z d a .N C a v st st 7 7 7 U p p o 3 a co ° 'I- -- v v v v v v v v v v v v v v v O mas as as as as as as rn rn rn rn rn rn 0) CI) 0) J 2 Z co p C O C 0 LU LU (ri U) lO (n (n (n (D (ri U) (D ((i U) ui U) - 0 0 (a O +• m (n 0 LI @ CD '- N CO N NY CO 0 CO CO M CO 0 WO O co f� M (f) co CD f� r CO f� CD CO T, CD CD O M co M N (D N CO M M (D a) G (� co CD CD N N Q) M CO CO CO N 0 CO CO CO T-- 0 C �- �- N N N CO C17 u7 U) CD N iMi 0 1 E. N N N N N ( (N N N N N N N N N N LY I— O U (I) CD O co O Cr) U) CO CO CO (O 0 0 CO M 01 Q„ ' CO N co M co (D O ' co CO CO CD 0 0 CO CO m d U CO f� 0 N 0 NN O C() (D NCO CO M N E CO CO (D CO Q) N O (O O d) CO CO 0 V' CO a) co H vvV vv_ LU LU n CD CO CO f- N- CO CO CO CO Z U U) M M CO M_ CO M coM M Cl (7 M M h Ci co Cl. � xooZ i- O 2 N. (O CA ,- co O 0 N M 00 CO 0 0 0 0 N- 0) 0 N r CD N O CO NT O D) (D CO N CO 4 (r) O 0 4 V' CD N ,- co co CO O N 0) f` CO O CO N CO 00 CO CO (0 CO CO CO CO CD CD N I� CO CA CO CO 0) 0) 0) C) COO 00 00 CO 00 O O 00 W W W W c0 W O O T--- N N I� N N V' 1- 1- V' ' ? N I� NY N CO O Q) C) 0) N CO CO CO CO CO CO CO CO 0) LL') e 9 M M M M (-6 V 4 4 4 4 V' 4 V CO CO CO O (0V V NY NY V N 0 0 0 0 0 0 0 O CO N a O Q co co co co co co co CO CO M M CO CO N N N CO j 0 O CD Q T CV C O sr 0) CT) Z 2 c 7 N V s< N V h CO N. t` t') N 0 0 0 0 Q co U d sr sr sr r NT 0 N CO CO M CO CO O O O O d 0 0 I� N Ni O CO 0) (r) U) N Di C) O 0 0 O at l0 0 O co M M N M N N co co 4 CO N OD 0) 0) CO 0) U▪ T 0 O O 0 ) CO 0_ d Q 0 0 I. O oi o = U O O O C C` d inh Z ` (fl co 0 0 a O 0 0 O O O c, 0 O 0 0 0 0 o O O co O O CD (0 ). T 0 0 0 N 0 0 0 0 0 0 0 0 0 N 0 0 N 0 . d 0 C� d O a o) w o o) O 06 O O O 0 0 6 0 O CO C') CO 0 CO 0 0 x- 0 CO 0 0 0 0 0 CO 0 0 o) (h 1r4 ( O E r' O 7 O O Cl. 0 .6 N N CO NY CO CD f- n Cb o) 0 1 51\\ T ° O o (11 p O a 0 0 0 c o 0 0 0 0 0 6- O o o O O O CX 0.at .. a o) >, c co 1 F' p•O w 0 0) y 3 Cc6 O) IZ Ua 'vt33p Co a co 0 O 0 0 O O O 0 0 O 0 0 0 0 O a) O O 0 1� Q C O O O O O 0 O O 0 0 O O O O O 0 O a- 0 O 0 a rn o 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 o ri C �) c CO CO 0) 0) 0) 0) 0) CO CA CT) 0) CO 00 m tu0 •T:U co a C O N N CA CO 1- CO D) CO CD CO h- V' CO 0) CO CO CO CD A- CO V N- CO 1` N (I) CO U) U) N U) 0) 0) CO V' CA A- N V CA CO d: O n 0) N- 0 a O V' U) M CD C 4 a) CT a) CO N 4 h CA O) O CO CD N d• 0) ? N CO 0) U) CD CO U) CD CA 1� n r N- CA n N V' CI 0 D O co = V n CD C0 (D U CI I. 7 N .- N N N CO O @.) tin U O v > NO N O 0 0m a — o ). j C>0 ) U CO y n Z o 0 0 0 0 0 o O o 0 0 0 0 0 0 0 0 0 0 0 0 j 0 c < o O o O o 0 0 0 0 0 0 0 0 0 0 0 O O o o O NCp 7.7. 0 N N N N N N N N N N N N N N N N N N N N N CD• CA4'3 7 co O)G 3 .0 0 O NF- 2ww .... 61 CO N- O M a- 0 CO CA V CO V N 1- to CO 1- CO N N-- c.) • U .a 1,- O CD 0) CO A- ti 01 N 0 O CD CA O CO i- 7 O V CO N C 0 N N- M Cb V' CO N O) 0) O CO CA 0 O O C>0 N V' d• CI) V' n V' V' CC) COCO O V' A- CA 0) 0) 0) 0) d) CA O L 0) 01 CO N- r CD CD U) 7 CO CO CO N N .- N "" W .0 N N N N N N N N N N N N N N N N N N N N N — co co co co co co co co0 co CID co co co co co co co co co co Co cc C CO " co co co CD CD CO CD CO CO CD CD CD CO CO CO CD CD CD CD CD CO a) O W 41) • Rcve. U 0acv CUcdVLC) O CO Co U) N O N- ) CO CD 0) CO V' CO CO AG ` @ r M co d• CO co O O r cO d• CO N- CO M O CO CV Co0) 0 UN N O n O VVA 1- M a) U) O A N N- 4 M U) O 0wCe T N • 03 a) D) CO N- CD CD U) N- U) 00 O O CO co U) N- 71 a' 12 .c N a c O) CD m CO CO CO CO CO O 00 r r co CO U) 4 4 CO CO N N G � vv vv vvv vvvvV' vv vo p 3 (a v al a) rn CO CD v CO CO CO CO A A 0) CI) A CI) CI) v .1- 01 rn CI) v v CS) 01 a) J 2 o D p i Ui tri Lc; Ui Ui Ui Ui Ui Lc; i UU) U) UUi Ui Ui UU) UZ 0 N NN d) CO N a0 a) v N V' O U) (D V• CO O CO d• O 0 O) co d) O CO CO CO U) CO h (O U) N N CO O U) d) c0 N CD CD CO C') O U) CO CD ti r (O M O co co- CID N CO V' n N- M U) N CO N M CO V' V' 'Cr C n CO Cr) 0) O O N CO CO V d• U) U) U) U) In U) U) U) U) 3 1 E N N N N (`7 I`� C.`� C`� c? ('7 M C'7 c? C'7 M C c7 M C� M M M i— =O U NM n U) O N O n N V n 1,- CO CD U) M 0) CO 4 Q. O N U) CO CD CO N N- N V' CO. CO At CO CO CD N CA V' CO V CO 4 N V' U) CO M a 4 CD CIO CD N n U) 0) U) O N O CD C) U) er V' 'Cr N 0) U) V' N- CO O N 01 O 01 U) O V• 0 CO CO CO CO CO c0 IX) CO r r r CO CC) V V' CO CO N N N 06 Cl) - M CO M M M M M M M coM M co co M M co co co M M a Z -- O O O O O 0 0 0 0 O O O O O r 0 CO V M N ✓ r r r r r r r r rr r r V. n r r r r CO CO O CO CO CO 00 CO CO CA CO CO Co CO CO CO CO CIn V. V. 0) a) a) a) a) a) O) co a) co CO Cr) 0) a) 0) 0) 0) 0) a) 0) 0) 0) CA00 00 ao CO o 0 CO0 0 o ot5 00 05 CIO Cb o 0 o ao co o6 > " F- r•-• r V' _ V' r r r V' r N- r N d• N N U) 0) 0) 01 O CD 0) U) O) N h N n r n n 1` r N N d• r 1` 1` N 4 N N- 4 r U) M d• a) h U) CD o 7 M N- n n M ✓ CD CO CO ti CD U) V' CO CO O a) CO 00 CO 00 n n N- N.- CV N N N N N N N N N N N N CL Ca Q Q CO Q _1 O O O O O 0 0 0 0 0 0 0 0 0 N O O N 0 CO Q O O O O O O O O O O O O O O (3) O O Q1 V' 0 1"-- O �O O O O O O O O O O O O O O N M r O CA co Q7 CO 0) D) 03 OW O W 0 0 ) ) D) Q7 a) D) Q) Q) O O O 01 Q7 CO U T co C e m O 0 O o < O u, < V- -c$ 0• O C Z d d co co d O O CO O CO co 0 0 co O O 0 0 0 0 CO 0 (O 0 N O Q_ T O O N O N O O O N O O O O N O 1- O h O h O �p . 0 ` O O CO O U) O O Ori O O O O Cl) O Ma U) O O C') O O V' O O O O O N- O O O O r O CT O V' O CO O Cry 1�i 3 O N N CO V U) CO CD n CO O O) O O .-- A- N N CO C.. 'O r r r r .- O r r r r r ` Cl- CV N Ch N Cl- N '- • a a) c o iE. p m• 03 rn 1Z cOo. w33a a CO o, O CO O CO O h LO O O C� Q •C O) O O) O CD O CO 0) O CO -O n CO 0) CO m C) U s 0 -o �- U � � 6 c. C O O N (D) (n CS CO u) N N C) h CO CO CrN O Q CV • O O) (0 N h C) C+) C) a CO NCO COCV CV CO CO).V ' V' V LLL) U)) CD CO 0 O a > N O N O 0 0 c d c > 'o (° U Co) y h 2 Z O O O O O O O o O O J D) 3 Q O O O O O O O O O O N O -7 U N N co.) (-Ni N N N N N N CD v) (7 1 j O co G N- y 3 C J O s .2NF-CLW � O- 6 co to co co u) v v CO a h U h .- h ‘- M M N N cr CO C p h Cf) h W N h h C) t_ O) NN N N N N N N N CO '- O) CN N N N N N N N N N (U 2N ' co co co co co co co co co CO C O/ ca — (O CD (O CO CO CO CO (O CD CO ii O W R V al • U 0 y7 2 d a C t. V CO CU CD O CO N O) `7 CO O w N 0-) O. Cl CO CO h CO h O w d N 0 y CO 00 h Q) CO O C) N CO U 0 '.- Z >, co O) N N N N N N R Z c2 t d d C ,- O O O CD CO CO h CD U D t B .E d' Ti V V C) C) C) C) C+) C) p O 7 R L"- COff0C Off) CM Off) T C) COffCO C)) J 1- 2 Z U) O O u) (O U) u) (O u) u5 LU L6 u) Z 0 0. V n M N0cr CD cr CO COC) C) W CO U- CO CA Q) CA h LL) V 4 u) 7 Co LLN) u) COO 0) Cr Cr 7 Cr V V CL - gE ? C') C C C m . F- 0 U M (O W CO LO (O CO O V CL O CO LL) CO u) d" N CO O CO CO m N 4 r) CO V' O h u) 0O N CO co O O O O O O e- 0) O O CA C) CO CO h h O CO CO U) C) C) N N N N N N N N a Z •- CO CO CO O N- CO CO cr (0 CO N h O) CO CO CO O O O N N u) CO 00 0O C) h . *f d' 7 V CO LL) U) O) O) CO CO CO CO O) C) CO CA U) E CO CD 0O 0O co 00 0O CO o5 o O O 0 O OD CO CO r-- CO CO O O O O O D) CO CO d' 00 CA O h 0O CT O 00 CO coCO h h CD CO h CO CD u) CO r r r r r r r r r Q CO N O cr O u) O CO CO CO CO Q CO N O W V CO u) CC) (D h O W CO CO ao h h h h COU) CO CO CO CO CO CO CO CO CO U T QO N (U m co ='. R.•E co O N = "O O O NO C O O E m co (O 2 O Z a CL O O a T N O N O N 0 0 N O O Off/ Cap . 0) h O h O h O O h O O r q 41* ` O O O O O O C`) I,,r--hC) 3 M 0 v C) m _ C.. an 9 CV CV m O C 0) F a a rn = o M L E O« N O) a) C00 a) Z 0a` u� 330 a a) -: O all 1 Mime 41 W a H 1 - 1 ? 12 v r. 11' __ � .-_._. _._ N co q4ttTy 'Cr: P d n , r I, a 4 C a a 4 g O S GI e` ....., M W tx 'r2 8 M Y 2, Ih rz Q Sl -• O �`o� __ pp 8 p p ' ' 0 t p M / R m �F Y < M(tIt/V Oil/($gJ1o1 W��/`11n0� N N e�•j F.a. N N C O 2 y+y1I < 11 i i 1 'ala� �nmr�mm----------4 I' P .,,, y i l`1' x s V a3 ..-8�8Mm�8S&; 8°V, '-:43 P a 4RT.IETT' _a3 0 „9,; 7 §8888888888888888888 as o"m o^ !llI !!!! / 7 _ 0888888888880 o a � � Tda I0NNNNNNNNNNN N oNn9 $ h ,11 a =a 4 j k0 a a v ^ Z `ISBS;N �SN,'�i 1i.7Wfx3�i gE. ,1 t ?, " ,9Am ry •ggg�vAi,8ry ,-ggiemir2 u`�i�j 8 , 3 Sf," m RX r^n'cim�fiR^Xl4gaiR°vgA g _ r • g 8 8 P2R o 0 0 0 0 0 o. ^^ 1 8 Z ' llicllmmmmmmlinall% 3 6R RRRRAAMIFJA2smg!,',32u3N Q 3s44tesssssstn8P4 ' � asa mmx'Asssssssaassssmm I! 0 sol Rsssos "4A, s 04 To oN (a!/U cc) gpiaa It:aiytan atu.L t N U EllrE4rninWrr,99 A a ;8888R$$$$$$$$8888g$ s w,, �3 ''esry���s,��Es�mRaF _ " o Z l'4 :$8$88$ $$$ 88$ 8�iE 4 a 5 i'. 3 > ■.I !A. o gm g ^� �1ema ^ g -�> dS ->S 'SS S3s m9 �3,="1$ $a $ TmVX $ o r 122 w 555 515 mi7'S.SAA3<C!52'.,,, $ > S> i> �� � a ),- ,..4...m ; 1. 22 Iii22.isailaa2ie2siiii2gg;o$ a 6 aw0 aiil2111 :1a21gffl xla q ' 3 �$ $ $ aea gY ' iVAIRII RgO Yy 3Soo 2112$2aaa2$$g2 ;112q2222 222q1222: i 3 Sl9 :9w aom + tttt + tt + t + + tt + t + tttt + + + ttttttttt +tt- + tt �g N �g$Pooo :. 0000. a^_<m a 8g f1', 3 Sa - LL „ 3 z.I`cr,M4AAA$a..rym m,i 9 11 3 s $ i, RRRRAADwr 3�es3 o i i fNii S sasasw888888$Z4$P4m<AP o Iii t,,t,,,AAASSR885ig2R2S2%% $ 111 z- g$$8$$wnnn,e ��r,r,r,$ IA!! iiii,,IEgni1mHEI 8 3$ m o O O o 8 o - N0 ao 4-.4.. 1105 g C o E a LL w � o �� v N Z`29 ni- Do g -.Eeis 41040111 ._ i4 !III cri 14100111110 . �orc 10' �v N IIIII • U �I�'OM c ^� c_i N N m u !:::'-4.•.;.,;,i 1 ir.J.1 saJws f siiirijwig lig iv. NJ— '5 . \mu 0 tg d•• e+ 8 3 a`3 d A 73 c.) N 7. U a) N - C co N Tii 0 - ' N N 8 V II wr r I * U j Q S S" M ... . '' 1 0. C f A Etl g Li...a of s — 6 9 _ g ¢ " H V ai 'i' Ile.' a g3 g 1 ri Ib : : " 3 — ■ I I I III■ I A um; I! 1 . I V gg g S ua- 2a rc g 3a $ 1 Q 9 :11 — I , Q ... $:8 xI ° II, CI m I II 0 'I 1 Z II J gg" , Illi lir O S 2 I LL 2 I $ 11 . 11 Z ^ i � 2 s F WI v IIII v i 1 p4 I Z i829 UI I- ,;- - jr, : , m Ja WE s .. Eo HU • V • . •V 1 iLL P O LN >ti ® • 1111 a V t I=1 II— I I r s � W Ini IR d .'.-J lL hil Prs1 m Ce v g uli W II • • Y �,., 111 U t O I U ,. e— C9 d cc H Y CO Ali All11•111MI, 11 < i I gs U 1 Z $ I1 MI z a , n 8 III " t1 PO I ® • " C I ii 18. ii do I ® 111 I I � I s ® z11 a " 0 z III=I111Iii E Ill 1 T Alaska Department of Natural Resources Land Administration System Page 1 of 1 Alaska Mapper Land Records/Status Plats Recorder's Search State Cabins Natural Resources I find Alaska DNR Case Summary File Type: ADL File Number: 28311 &Printable Case File Summary See Township,Range,Section and Acreage? New Search 0 Yes 0 No LAS Menu I Case Abstract I Case Detail I Land Abstract File: ADL 28311 _TIP_ Search for Status Plat Updates As of 02/16/2011 Customer: 000107377 BP EXPLORATION(ALASKA)INC PO BOX 196612/900 E.BENSON BL ATTN:LAND MANAGER-ALASKA ANCHORAGE AK 995196612 Case Type:784 OIL&GAS LEASE COMP DNR Unit: 780 OIL AND GAS File Location:DOG DIV OIL AND GAS Case Status:35 ISSUED Status Date: 08/19/1965 Total Acres: 2560.000 Date Initiated:05/28/1965 Office of Primary Responsibility:DOG DIV OIL AND GAS Last Transaction Date: 12/04/2006 Case Subtype: NS NORTH SLOPE Last Transaction:AA-NRB ASSIGNMENT APPROVED Meridian: U Township: O10N Range: 014E Section: 01 Section Acres:640 Search Plats Meridian: U Township: 010N Range: 014E Section: 02 Section Acres: 640 Meridian: U Township: O10N Range: 014E Section: 11 Section Acres: 640 Meridian: U Township: O10N Range: 014E Section: 12 Section Acres:640 Legal Description 05-28-1965 ***SALE NOTICE LEGAL DESCRIPTION*** { C14-13210N 14E UM 1,2,11,12 2560.00 U-3- 7 End of Case Summary Last updated on 02/16/2011. Not sure who to contact?Have a question about DNR?Visit the Public Information Center. Report technical problems with this page to the Webmaster. Site optimized for Netscape 7, IE 6 or above. This site also requires that all COOKIES must be accepted. State of Alaska Natural Resources LAS Home Copyright Privacy System Status http://dnr.alaska.gov/projects/las/Case Summary.cfin?FileType=ADL&FileNumber=2831... 2/16/2011 OVERSIZED DOCUMENT INSERT This file contains one or more oversized documents. These materials may be found in the original hard file or check the parent folder to view it in digital format. TRANSMITTAL LETTER CHECKLIST WELL NAME PTD# 0.Z//0-24‘ ✓Development Service Exploratory Stratigraphic Test Non-Conventional Well • FIELD: 7,E'•U13SDE" POOL: -,,ejI /c24 09/ £2 Circle Appropriate Letter/Paragraphs to be Included in Transmittal Letter CHECK ADD-ONS WHAT (OPTIONS) TEXT FOR APPROVAL LETTER APPLIES MULTI LATERAL The permit is for a new wellbore segment of existing well (If last two digits in Permit No. ,API No. 50- - - API number are between 60-69) Production should continue to be reported as a function of the original API number stated above. PILOT HOLE In accordance with 20 AAC 25.005(f), all records, data and logs acquired for the pilot hole must be clearly differentiated in both well name ( PH) and API number (50- - - ) from records, data and logs acquired for well SPACING The permit is approved subject to full compliance with 20 AAC EXCEPTION 25.055. Approval to perforate and produce / inject is contingent upon issuance of a conservation order approving a spacing exception. assumes the liability of any protest to the spacing exception that may occur. DRY DITCH All dry ditch sample sets submitted to the Commission must be in SAMPLE no greater than 30' sample intervals from below the permafrost or from where samples are first caught and 10' sample intervals through target zones. Non-Conventional Please note the following special condition of this permit: Well production or production testing of coal bed methane is not allowed for (name of well) until after (Company Name) has designed and implemented a water well testing program to provide baseline data on water quality and quantity. (Company Name) must contact the Commission to obtain advance approval of such water well testing program. Rev: 1/11/2008 o D 3 19 mO 1- -0 o -0o 0 cc12, o n 5 n ° 3 r- 0 3 0 coo vi r B. o N N N y oO m w .. 0.co° 6) D A 0 O) 0 0 0 XI ° n N N N D) gU fll O O E 7 O (D O (D O N O _, -I CAD (w) () w w Co CO w w w N N N N N r..) N N N N CO CO V O) U) A G) ND ° n CO 0D V 0) 01 A w Ni -s O CO CO V 0) U7 A w N) -s 0 CO CO 0) U) A CO Ni -s 0 V m 0 (/) 0 o � � v, g n Co CO o D =. D 0 0 0 0 co o -oD * 0 � -0O O �. cn g g g c r— v z � n 0 o m ni n) m (D -o o 0 0 = n O- DI °- DI K K K c 0 = O co (D N •o -v a c (D (D (D 7 CD CD 0 X co 7 Q O v 3 � °(- — <- .0° la y' -i -i N o g _ (D (D < C _ _ _ O -' 7 W r m D) m 3. -o m m m m m m m c m c (o F < < o c ° m 0 0 , v m < 0 0 0 m ° 3 0 - °- n (D o > CD _ 3 a = m DI a D) n _ o0 (D () o. Cl) w m o 0 0 o m 5 v m C)) __ c - <= m _. '0 O 7 D Co 0) N O 7 N 0 d (D L. (D N O Q a D) 0 o -• CD 3' 7 7 S O 9- co co (o ( N 3 N 7 3 m 7 Q o 0) co 7• w < m m N. m n o- Q Q N ° o a a a Q o r- j1 CD Z a m ° o 2 v m E m a) = c, m a a on n 3 F 'm m m ni ..z- N m o 0 = v v O m 7- 7 c/) p n a- �rS * Q. n' O W o N (Q aN) a) N N -O (fl -s S '00 in- N N (a '°O '°O N 3 ? V) D °" 0 0 7 C a ' O CO 3 p) a N -, (D a = 0 0 3 -o (p) A -o c C (D O CD (D a ° -O (D o SM m c : -o a g m o 3 m 3 n N 0 0 9 7 0 0 N a 0 3 co o a a m ° < a n 7 o a � O o n o m d m F m 0 co n o m i-2. N a * * 0 n m co. c (1 a9 n -° o z o o < D. o o (D o 7• m °) w 7 � am n v °) n . . •o -o m v v a ° of 3 (° F v ° m o m 1 3 v o 2 0 -0 7 v �' ° • m m o o n �' n n o 3 m ° D CD 04; �c o v. °: 3 0 0 0 >r • m n c c o = m m ° a o D o y `m co * a o' n o v �_• (� c (o o a o ° c n o o (' �T 7 -0 7- N -o m ;:s5- m ° �, 0 7 .-. m > > o m 3 7 = a - 3 3 j D co cu ° ° (° ° °• W ° 3' o •o co co a = mon = 0 ° o Z m voi Oa w ,....4. c_ QD o m o m co m cn C7 ✓ UI O D a m o ° n ° ° oF DI 0o Ni ii; 7 N c' .(A., 7 .-. O O C p t/) aj ry41 < 7 co c O< o 3 y c m m o — c(�1 O OD a) n N �. () Q0 ,n+ (D a 'Oo O- N O0 N A (O a 7 0 (Q c p' n Q •p N D 7 c N .N. 7Tp c CO X o dN NN n No ° oN S DCD 0 o m m n m 0 * 3 s ___ 7 N 7 Cr T O n O 0 cn 7 7 (D 3 2 p r co co cTi 3 N o v 0 1 v T cn ( cn 1 CD O-I N N. Z Z z z z z -< -< -< -< -< -< z -< -< -< -< -< z z z z z z z -< -< -< -< -< -< -< -< -< -< -< -< Z z F D D D D 0 D m m m m m m D ° ° o 0 o D D D D D D D o o m m m ° ° ° ° CD CD o D D O a M o < 7 z I K K * X co X. ^ c0 m co v) O w N v m (n z O co Cl) > x m o (o 3 a a a 7 CD o o m �, S o CD (D (D C CD (Dn 7 O S o < 7 ° (D 7 .n.. N CD n (CD Oj o z ck, CD 0m n co m 3 (/) co p) W 7 (U N O (n N 7 7 0 -, N o °. 0 7 DJ O co O ai -o 0 O- 7 co 7 7 0 O- ..< > o cov ) 0) Cl) F•X -0 3' co co 3. C 0 cu =0 Co' W 7 3 <<' c co vi �' w co CO co CD U) N 7- - i W N O N = co A O° co C °- C - u • m m - a 7 C - 0 0 co 2 a Cl) cri co CD cn CO < 3 '2. X 0D 0 a C) N ca O O 7 co = CD Cl) rJ U) 5• _) m 3 co N O -0 = n ° rr� W (D In V O) () N N N N OD N O � 7 1]1 ° V 0 7 7 N O C °' (w0 0- (w)) O n N CD CD O Z O a o a c o 1 'N 'O 'O '(D O m 3 3 N 7 0 co o ) K CD 7 b C ND CD ° 7-4 E _ ° o rn = v▪ 0) n a Bt o c (D co = o O 0) 7 ' O 3 O) p_ co - 7 O = N 7' "' 03 5• - O CD 0) O 7' C O co 0 0 3 cT 3 O a O 0 a Cf) < co O N (D 0 770 7 D 7 m tiC! en VvI'ell History' Fiie APE * D Infoi ration of detailed nature that is not particularly germane to the Well Permitting Process but is part of the history file. To improve the readability of the Well History file and to simplify finding information, information of this nature is accumulated at the end of the file under APPENDIX. No special effort has been made to chronologically organize this category of information. • Z,tk—OZ-G tapescan.txt **** REEL HEADER **** MWD 11/08/25 BHI 01 LIS Customer Format Tape **** TAPE HEADER **** MWD 11/04/25 3759970 01 3" CTK *** LIS COMMENT RECORD *** II III IIIliii111111 Remark File Version 1.000 IIIA ! 11 111111111 Extract File: ldwg.las version Information VERS. 1.20: CWLS log ASCII Standard -VERSION 1.20 WRAP. NO: One line per frame Well Information Block #MNEM.UNIT Data Type Information STRT.FT 9714.5000: Starting Depth STOP.FT 12149.7500: Ending Depth STEP.FT 0.5000: Level Spacing NULL. -999.2500: Absent Value COMP. COMPANY: BP Exploration (Alaska) , Inc. WELL. WELL: 06-02APB1 FLD . FIELD: Prudhoe Bay Unit LOC . LOCATION: 70 deg 14' 39.574"N 148 deg 29' 59.491"W CNTY. COUNTY: North Slope Borough STAT. STATE: Alaska SRVC. SERVICE COMPANY: Baker Hughes INTEQ TOOL. TOOL NAME & TYPE: 3" CTK DATE. LOG DATE: 25 Apr 2011 API . API NUMBER: 500292028270 Parameter Information Block #MNEM.UNIT value Description SECT. 02 Section TOWN.N T1ON Township RANG. R14E Range PDAT. MSL Permanent Datum EPD .F 0 Elevation of Perm. Datum LMF . KB Log Measured from FAPD.F 64.00 Feet Above Perm. Datum DMF . KB Drilling Measured From EKB .F 64.00 Elevation of Kelly Bushing EDF .F 0 Elevation of Derrick Floor EGL .F 0 Elevation of Ground Level Page 1 • tapescan.txt CASE.F N/A Casing Depth OS1 . DIRECTIONAL Other Services Line 1 Remarks (1) All depths are Measured Depths (MD) unless otherwise noted. (2) All depths are Bit Depths unless otherwise noted. (3) All True vertical Depths (TVDSS) are subsea corrected. (4) All Formation Evaluation data is realtime data. (5) Baker Hughes INTEQ utilized CoilTrak downhole tools and the Advantage surface system to log this well . (6) Tools ran in the string included Casing Collar Locator, an Electrical Disconnect and Circulating Sub, a Drilling Performance Sub (Inner and Outer Downhole Pressure, vibration and Downhole weight on Bit) , a Directional and Gamma Sub, and a Hydraulic Orienting Sub with a Near Bit Inclination Sensor. (7) Data presented here is final and has been depth shifted to a Primary Depth Control (PDC) log provided by well 06-02A, above the Kick off Point of 10490 feet MD, dated 02 May 2011 per Walter Tifental with BP Exploration (Alaska) , Inc. (8) The sidetrack was drilled from 06-02 through a milled window in a 9 5/8 inch liner. Top of window 10055 ft.MD (8570.7 ft.TVDSS) Bottom of window 10063 ft.MD (8577.7 ft.TVDSS) (9) Tied to 06-02 at 10050 feet MD (8566.8 feet TVDSS) . (10) The interval from 12109 ft to 12150 ft MD (8937.8 ft. to 8932.4 ft. TVDSS) was not logged due to sensor to bit offset at well TD. MNEMONICS: GRAX -> Gamma Ray [MWD] (MWD-API units) ROP AVG -> Rate of Penetration, feet/hour RACLX -> Resistivity (AT)(LS)400kHz-Compensated Borehole Corrected (OHMM) RACHX -> Resistivity (AT)(LS)2MHz-Compensated Borehole Corrected (OHMM) RPCLX -> Resistivity (PD)(LS)400kHz-Compensated Borehole Corrected (OHMM) RPCHX -> Resistivity (PD)(LS)2MHz-Compensated Borehole Corrected (OHMM) TVDSS -> True Vertical Depth (Subsea) CURVE SHIFT DATA BASELINE, MEASURED, DISPLACEMENT 9723.17, 9725.76, ! 2.58398 9731.14, 9733.72, ! 2.58008 9749.63, 9752.43, ! 2.7959 9771.25, 9771.68, ! 0.429688 9776.62, 9777.48, ! 0.860352 9787.12, 9788.2, ! 1.07715 9797.03, 9798.11, ! 1.07617 9808.13, 9808.99, ! 0.860352 9812.86, 9814.15, ! 1.29102 9826.62, 9828.13, ! 1.50586 9841.68, 9842.11, ! 0.430664 9856.67, 9856.02, ! -0.646484 9866.14, 9864.85, ! -1.29199 9878.2, 9876.05, ! -2.15332 9888.24, 9885.66, ! -2.58105 9893.83, 9890.17, ! -3.65527 9895.55, 9893.18, ! -2.36523 9899.42, 9896.19, ! -3.22559 9902.22, 9899.42, ! -2.7959 9917.25, 9915.31, ! -1.9375 9923.27, 9921.34, ! -1.9375 9927.81, 9926.52, ! -1.29004 9932.54, 9928.88, ! -3.65625 9935.98, 9932.75, ! -3.22559 Page 2 tapescan.txt 9942.95, 9941.23, ! -1.7207 9946.64, 9944.49, ! -2.15332 9956.12, 9952.67, ! -3.44531 9961.23, 9957.14, ! -4.08594 9962.3, 9958.86, ! -3.44141 9965. 53, 9962.52, ! -3.01074 9968. 54, 9965.31, ! -3.22559 9971.12, 9968.32, ! -2.7959 9973.48, 9971.55, ! -1.93555 9976.07, 9974.34, ! -1.7207 9979. 51, 9977.36, ! -2.15039 9982.52, 9981.23, ! -1.29004 9986.91, 9985.4, ! -1.50781 9990.58, 9989.08, ! -1.50488 9992.95, 9991.23, ! -1.7207 9999.61, 9997.68, ! -1.93555 10004.6, 10002.6, ! -1.93555 10007.4, 10005, ! -2.36523 10009.3, 10007.8, ! -1.50586 10012.1, 10009.9, ! -2.15137 10017.2, 10014.7, ! -2.58105 10021.3, 10018.5, ! -2.7959 10025.6, 10023.5, ! -2.15039 10032. 5, 10030.2, ! -2.36523 10035.1, 10033.4, ! -1.7207 10037.7, 10036, ! -1.72266 10042.2, 10040.3, ! -1.93555 10050.4, 10049.1, ! -1.29004 10062.9, 10061.9, ! -1.07617 10064.7, 10063.8, ! -0.860352 10066.4, 10065.3, ! -1.0752 10070. 5, 10069, ! -1. 50781 10076.1, 10074.3, ! -1.7207 10079. 5, 10078, ! -1. 50488 10082.9, 10081.7, ! -1.29004 10085. 5, 10084.2, ! -1.29004 10093.2, 10091.9, ! -1.29004 10096.2, 10094.5, ! -1.7207 10106. 5, 10104.5, ! -1.9375 10108, 10106.1, ! -1.93555 10112.9, 10111, ! -1.9375 10122, 10119, ! -3.01074 10124.3, 10122.2, ! -2.15039 10126.9, 10125.2, ! -1.71973 10134.5, 10132.7, ! -1.7207 10139.2, 10136.8, ! -2.36621 10143.3, 10141.6, ! -1.72266 10145.9, 10145.3, ! -0.646484 10148.6, 10148.9, ! 0.21582 10153.6, 10151.7, ! -1.93555 10155.6, 10153.4, ! -2.15332 10159.4, 10157, ! -2.36523 10165, 10162.4, ! -2.58105 10167.6, 10166.9, ! -0.644531 10176.9, 10175.4, ! -1.50781 10183.2, 10181.6, ! -1.50781 10186.9, 10185, ! -1.93457 10191.4, 10190.2, ! -1.29004 10193.6, 10192.3, ! -1.29004 10196.6, 10195.1, ! -1.50488 10202.4, 10200, ! -2.36523 10207.1, 10203.9, ! -3.22559 10211.2, 10208.9, ! -2.36621 Page 3 tapescan.txt 10222.8, 10220.6, ! -2.15332 10225, 10223.5, ! -1.50586 10227.6, 10225.8, ! -1.7207 10231.4, 10229.5, ! -1.93848 10244.8, 10242.2, ! -2.58008 10246. 5, 10244.1, ! -2.36914 10248.4, 10245.6, ! -2.7959 10252.1, 10248.9, ! -3.22656 10254.5, 10251.2, ! -3.22559 10261, 10259.1, ! -1.93555 10263.8, 10261.4, ! -2.36523 10269.3, 10266.5, ! -2.7998 10271.3, 10267.9, ! -3.44141 10274.6, 10271.8, ! -2.7959 10278, 10274.7, ! -3.23047 10284.6, 10282.1, ! -2. 58398 10297.3, 10295.6, ! -1.72266 10311.5, 10310, ! -1.50488 10326.9, 10325.4, ! -1. 50684 10335.5, 10333.6, ! -1.9375 10346.7, 10345.2, ! -1.50684 10361.9, 10360.4, ! -1.50488 10364.7, 10363.4, ! -1.29004 10373.1, 10370.3, ! -2.7959 10375.3, 10373.2, ! -2.15039 10388.9, 10387.2, ! -1.72266 10395.7, 10394.5, ! -1.29004 10399.2, 10397.7, ! -1.50586 10405. 5, 10403.8, ! -1.72266 10414.5, 10412.5, ! -1.93555 10420, 10417. 5, ! -2.58105 10425.8, 10423.5, ! -2.36523 10431.6, 10428.8, ! -2.79883 10433.9, 10431.3, ! -2. 58105 10436.7, 10435.2, ! -1. 50488 10443.6, 10441.7, ! -1.93555 10447.6, 10445.4, ! -2.15332 10462.7, 10460.4, ! -2.36523 10466.4, 10464.9, ! -1. 50586 10469.6, 10467.2, ! -2.36523 10473.9, 10471.1, ! -2.79492 10478, 10472.6, ! -5.37598 10482.7, 10477.6, ! -5.16797 10487, 10482.3, ! -4.7373 10490.6, 10486.3, ! -4.30664 EOZ END ! BASE CURVE: GROH, OFFSET CURVE: GRAX Tape Subfile: 1 206 records. . . Minimum record length: 10 bytes Maximum record length: 132 bytes **** FILE HEADER **** MWD .001 1024 Page 4 tapescan.txt *** LIS COMMENT RECORD *** � 1 ! ! III11111111IIII Remark File Version 1.000 The data presented here is final and has been depth adjusted to a Primary Depth Control (PDC) log provided by well 06-02A, above the Kick off Point of 10490 feet MD, dated 02 May 2011 per Walter Tifental with BP Exploration (Alaska) , Inc. * FORMAT RECORD (TYPE# 64) Data record type is: 0 Datum Frame Size is: 28 bytes Logging direction is down (value= 255) Optical Log Depth Scale Units: Feet Frame spacing: 0.500000 Frame spacing units: [F ] Number of frames per record is: 36 One depth per frame (value= 0) Datum Specification Block Sub-type is: 1 FRAME SPACE = 0.500 * F ONE DEPTH PER FRAME Tape depth ID: F 6 Curves: Name Tool Code Samples units Size Length 1 GR MWD 68 1 AAPI 4 4 2 ROP MWD 68 1 F/HR 4 4 3 RAD MWD 68 1 OHMM 4 4 4 RAS MWD 68 1 OHMM 4 4 5 RPD MWD 68 1 OHMM 4 4 6 RPS MWD 68 1 OHMM 4 4 24 Total Data Records: 136 Tape File Start Depth = 9714.500000 Tape File End Depth = 12145.500000 Tape File Level spacing = 0.500000 Tape File Depth Units = feet **** FILE TRAILER **** Tape Subfile: 2 149 records. . . Minimum record length: 54 bytes Maximum record length: 4124 bytes **** FILE HEADER **** Page 5 tapescan.txt MWD .002 1024 *** LIS COMMENT RECORD *** 111111 , 1MMI ! 1111111 Remark File Version 1.000 This file contains the raw-unedited field MWD data. * FORMAT RECORD (TYPE# 64) Data record type is: 0 Datum Frame Size is: 28 bytes Logging direction is down (value= 255) Optical Log Depth Scale Units: Feet Frame spacing: 0.250000 Frame spacing units: [F ] Number of frames per record is: 36 One depth per frame (value= 0) Datum specification Block Sub-type is: 1 FRAME SPACE = 0.250 * F ONE DEPTH PER FRAME Tape depth ID: F 6 Curves: Name Tool Code Samples Units Size Length 1 GR MWD 68 1 AAPI 4 4 2 ROP MWD 68 1 F/HR 4 4 3 RAD MWD 68 1 OHMM 4 4 4 RAS MWD 68 1 OHMM 4 4 5 RPD MWD 68 1 OHMM 4 4 6 RPS MWD 68 1 OHMM 4 4 24 Total Data Records: 271 Tape File Start Depth = 9712.000000 Tape File End Depth = 12149.750000 Tape File Level spacing = 0.250000 Tape File Depth Units = feet **** FILE TRAILER **** Tape Subfile: 3 284 records. . . Minimum record length: 54 bytes Maximum record length: 4124 bytes **** TAPE TRAILER **** MWD Page 6 tapescan.txt 11/04/25 3759970 01 **** REEL TRAILER **** MWD 11/08/25 BHI 01 Tape Subfile: 4 2 records. . . Minimum record length: 132 bytes Maximum record length: 132 bytes 0 Tape subfile 1 is type: LIS 0 Tape subfile 2 is type: LIS DEPTH GR ROP RAD RAS RPD RPS 9714. 5000 -999.2500 -999.2500 -999.2500 -999.2500 -999.2500 -999.2500 9715.0000 -999.2500 -999.2500 -999.2500 -999.2500 -999.2500 -999.2500 12145. 5000 -999.2500 19. 5791 -999.2500 -999.2500 -999.2500 -999.2500 Tape File Start Depth = 9714. 500000 Tape File End Depth = 12145. 500000 Tape File Level spacing = 0. 500000 Tape File Depth units = feet 0 Tape Subfile 3 is type: LIS DEPTH GR ROP RAD RAS RPD RPS 9712.0000 -999.2500 -999.2500 -999.2500 -999.2500 -999.2500 -999.2500 9712.2500 -999.2500 -999.2500 -999.2500 -999.2500 -999.2500 -999.2500 Page 7 tapescan.txt 12149.7500 -999.2500 45.8000 -999.2500 -999.2500 -999.2500 -999.2500 Tape File start Depth = 9712.000000 Tape File End Depth = 12149.750000 Tape File Level Spacing = 0.250000 Tape File Depth Units = feet Tape Subfile 4 is type: LIS Page 8 tapescan.txt **** REEL HEADER **** MWD 11/08/18 BHI 01 LIS Customer Format Tape **** TAPE HEADER **** MWD 11/05/02 3759970 01 3" CTK *** LIS COMMENT RECORD *** II III 11111111111111 Remark File Version 1.000 II1111111111M1111 1 Extract File: ldwg.las Version Information VERS. 1.20: CWLS log ASCII Standard -VERSION 1.20 WRAP. NO: One line per frame well Information Block #MNEM.UNIT Data Type Information STRT.FT 9714. 5000: Starting Depth STOP.FT 11450.0000: Ending Depth STEP.FT 0. 5000: Level Spacing NULL. -999.2500: Absent Value COMP. COMPANY: BP Exploration (Alaska) , Inc. WELL. WELL: 06-02A FLD . FIELD: Prudhoe Bay Unit LOC . LOCATION: 70 deg 14' 39.574"N 148 deg 29' 59.491"W CNTY. COUNTY: North Slope Borough STAT. STATE: Alaska SRVC. SERVICE COMPANY: Baker Hughes INTEQ TOOL. TOOL NAME & TYPE: 3" CTK DATE. LOG DATE: 02 May 2011 API . API NUMBER: 500292028201 Parameter Information Block #MNEM.UNIT Value Description SECT. 02 Section TOWN.N T1ON Township RANG. R14E Range PDAT. MSL Permanent Datum EPD .F 0 Elevation Of Perm. Datum LMF . KB Log Measured from FAPD.F 64.00 Feet Above Perm. Datum DMF . KB Drilling Measured From EKB .F 64.00 Elevation of Kelly Bushing EDF .F 0 Elevation of Derrick Floor EGL .F 0 Elevation of Ground Level Page 1 n '` 1, (4 30\-- tapescan.txt CASE.F N/A Casing Depth OS1 . DIRECTIONAL Other Services Line 1 —Remarks (1) All depths are Measured Depths (MD) unless otherwise noted. (2) All depths are Bit Depths unless otherwise noted. (3) All True vertical Depths (TVDSS) are subsea corrected. (4) All Formation Evaluation data is realtime data. (5) Baker Hughes INTEQ utilized CoilTrak downhole tools and the Advantage surface system to log this well . (6) Tools ran in the string included Casing Collar Locator, an Electrical Disconnect and Circulating Sub, a Drilling Performance Sub (Inner and Outer Downhole Pressure, vibration and Downhole weight on Bit) , a Directional and Gamma Sub, and a Hydraulic Orienting Sub with a Near Bit Inclination Sensor. (7) Data presented here is final and has been depth shifted to a secondary Depth Control (SDC) log provided by Schlumberger GR CNL dated 04 May 2011 per Walter Tifental with BP Exploration (Alaska) , Inc. The MWD data is now the Primary Depth Conrtol (PDC) log for well 06-02A. (8) The sidetrack was drilled from 06-02 through a milled window in a 9 5/8 inch liner. Top of window 10055 ft.MD (8570.7 ft.TVDSS) Bottom of window 10063 ft.MD (8577.7 ft.TVDSS) (9) Tied to 06-02 at 10050 feet MD (8566.8 feet TVDSS) . (10) Baker Hughes INTEQ run 7 through 9 was used to drill 06-02PB1. (11) Baker Hughes INTEQ run 10 was used to set an open hole billet at 10490 feet MD (8885.4 feet TVDSS) . (12) The interval from 11409 ft to 11450 ft MD (8977.2 ft. to 8978.0 ft. TVDSS) was not logged due to sensor to bit offset at well TD. MNEMONICS: GRAX -> Gamma Ray [MWD] (MWD-API units) ROP AVG -> Rate of Penetration, feet/hour RACLX -> Resistivity (AT)(LS)400kHz-Compensated Borehole Corrected (OHMM) RACHX -> Resistivity (AT)(LS)2MHz-Compensated Borehole Corrected (OHMM) RPCLX -> Resistivity (PD)(LS)400kHz-Compensated Borehole Corrected (OHMM) RPCHX -> Resistivity (PD)(LS)2MHz-Compensated Borehole Corrected (OHMM) TVDSS -> True vertical Depth (Subsea) CURVE SHIFT DATA BASELINE, MEASURED, DISPLACEMENT 9731.14, 9733.72, ! 2.58008 9749.63, 9752.43, ! 2.7959 9771.25, 9771.68, ! 0.429688 9776.62, 9777.48, ! 0.860352 9808.13, 9808.99, ! 0.860352 9812.86, 9814.15, ! 1.29102 9826.62, 9828.13, ! 1.50586 9841.68, 9842.11, ! 0.430664 9888.24, 9885.66, ! -2.58105 9893.83, 9890.17, ! -3.65527 9895.55, 9893.18, ! -2.36523 9899.42, 9896.19, ! -3.22559 9902.22, 9899.42, ! -2.7959 9927.81, 9926.52, ! -1.29004 9932.54, 9928.88, ! -3.65625 9935.98, 9932.75, ! -3.22559 9942.95, 9941.23, ! -1.7207 9961.23, 9957.14, ! -4.08594 9962.3, 9958.86, ! -3.44141 Page 2 tapescan.txt 9965.53, 9962. 52, ! -3.01074 9968.54, 9965.31, ! -3.22559 9971.12, 9968.32, ! -2.7959 9973.48, 9971.55, ! -1.93555 9976.07, 9974.34, ! -1.7207 9979.51, 9977.36, ! -2.15039 9982. 52, 9981.23, ! -1.29004 9990. 58, 9989.08, ! -1.50488 9992.95, 9991.23, ! -1.7207 9999.61, 9997.68, ! -1.93555 10004.6, 10002.6, ! -1.93555 10007.4, 10005, ! -2.36523 10009.3, 10007.8, ! -1.50586 10012.1, 10009.9, ! -2.15137 10017.2, 10014.7, ! -2. 58105 10021.3, 10018.5, ! -2.7959 10025.6, 10023.5, ! -2.15039 10032.5, 10030.2, ! -2.36523 10035.1, 10033.4, ! -1.7207 10042.2, 10040.3, ! -1.93555 10050.4, 10049.1, ! -1.29004 10062.9, 10061.9, ! -1.07617 10064.7, 10063.8, ! -0.860352 10066.4, 10065.3, ! -1.0752 10076.1, 10074.3, ! -1.7207 10079.5, 10078, ! -1.50488 10082.9, 10081.7, ! -1.29004 10085.5, 10084.2, ! -1.29004 10093.2, 10091.9, ! -1.29004 10096.2, 10094.5, ! -1.7207 10108, 10106.1, ! -1.93555 10122, 10119, ! -3.01074 10124.3, 10122.2, ! -2.15039 10126.9, 10125.2, ! -1.71973 10134.5, 10132.7, ! -1.7207 10139.2, 10136.8, ! -2.36621 10148.6, 10148.9, ! 0.21582 10153.6, 10151.7, ! -1.93555 10159.4, 10157, ! -2.36523 10165, 10162.4, ! -2.58105 10167.6, 10166.9, ! -0.644531 10186.9, 10185, ! -1.93457 10191.4, 10190.2, ! -1.29004 10193.6, 10192.3, ! -1.29004 10196.6, 10195.1, ! -1. 50488 10202.4, 10200, ! -2.36523 10207.1, 10203.9, ! -3.22559 10211.2, 10208.9, ! -2.36621 10225, 10223. 5, ! -1.50586 10227.6, 10225.8, ! -1.7207 10244.8, 10242.2, ! -2.58008 10248.4, 10245.6, ! -2.7959 10252.1, 10248.9, ! -3.22656 10254.5, 10251.2, ! -3.22559 10261, 10259.1, ! -1.93555 10263.8, 10261.4, ! -2.36523 10271.3, 10267.9, ! -3.44141 10274.6, 10271.8, ! -2.7959 10311. 5, 10310, ! -1.50488 10361.9, 10360.4, ! -1. 50488 10364.7, 10363.4, ! -1.29004 10373.1, 10370.3, ! -2.7959 10375.3, 10373.2, ! -2.15039 Page 3 tapescan.txt 10395.7, 10394.5, ! -1.29004 10399.2, 10397.7, ! -1.50586 10414.5, 10412.5, ! -1.93555 10420, 10417.5, ! -2.58105 10425.8, 10423.5, ! -2.36523 10433.9, 10431.3, ! -2. 58105 10436.7, 10435.2, ! -1. 50488 10443.6, 10441.7, ! -1.93555 10462.7, 10460.4, ! -2.36523 10466.4, 10464.9, ! -1.50586 10469.6, 10467.2, ! -2.36523 10473.9, 10471.1, ! -2.79492 10478, 10472.6, ! -5.37598 10515.8, 10513.3, ! -2.58008 10519.9, 10516.9, ! -3.01074 10524.9, 10521, ! -3.87012 10530.7, 10527.7, ! -3.01074 10533.4, 10529.9, ! -3.44043 10542.2, 10539, ! -3.22559 10553.8, 10550.4, ! -3.44043 10556.8, 10552.9, ! -3.87109 10562.8, 10559.2, ! -3.65527 10572.9, 10569.5, ! -3.44043 10581.7, 10578.6, ! -3.01074 10583.9, 10580.7, ! -3.22656 10601, 10596.5, ! -4. 5166 10604.5, 10599.9, ! -4.5166 10622.4, 10619, ! -3.44043 10631, 10627.6, ! -3.44141 10634.7, 10631, ! -3.65527 10639.1, 10635.4, ! -3.65625 10643.4, 10638.9, ! -4.5166 10656.1, 10652, ! -4.08594 10660.4, 10656.9, ! -3.44141 10662.5, 10659.9, ! -2. 58008 10667.5, 10663.8, ! -3.65625 10669.2, 10666.6, ! -2. 58105 10673.3, 10671.1, ! -2.15039 10678, 10673.9, ! -4.08594 10684, 10680.4, ! -3.65625 10689.4, 10684.7, ! -4.73145 10692.1, 10687.1, ! -4.94629 10696.6, 10690.6, ! -6.02148 10704.8, 10700.5, ! -4.30078 10716.4, 10711.7, ! -4.73145 10721.5, 10717, ! -4.51562 10748.3, 10746.4, ! -1.93555 10758.4, 10756.5, ! -1.93555 10764.5, 10763.8, ! -0.645508 10787.4, 10787.6, ! 0.214844 10792.3, 10792.1, ! -0.214844 10793.6, 10794.5, ! 0.860352 10800.7, 10799.2, ! -1. 50488 10806.7, 10806.7, ! 0 10811.4, 10810.2, ! -1.29004 10814.9, 10813.8, ! -1.0752 10827.4, 10825, ! -2.36523 10851.7, 10849.7, ! -1.93555 10857. 5, 10855.7, ! -1.7207 10916, 10910.6, ! -5.37695 10922.8, 10919.8, ! -3.01074 10931.4, 10926.1, ! -5.37598 10956.4, 10950.2, ! -6.23633 Page 4 tapescan.txt 10959.2, 10953.6, ! -5.5918 10969.3, 10963.5, ! -5.80664 10983.9, 10979.2, ! -4.73047 10994, 10987.6, ! -6.45215 11000, 10995.1, ! -4.94629 11002.8, 10997.2, ! -5.59082 11026.9, 11023.5, ! -3.44141 11031.9, 11025.8, ! -6.02148 11173.8, 11171.4, ! -2.36523 11193.2, 11190.2, ! -3.01074 EOZ END ! BASE CURVE: GROH, OFFSET CURVE: GRAX Tape Subfile: 1 233 records. . . Minimum record length: 10 bytes Maximum record length: 132 bytes **** FILE HEADER **** MWD .001 1024 *** LIS COMMENT RECORD *** I111I11 11II VIII I Remark File Version 1.000 The data presented here is final and has been depth adjusted to a Secondary Depth Control (SDC) log provided by Schlumberger GR CNL dated 04 May 2011 per Walter Tifental with BP Exploration (Alaska) , Inc. The MWD data is now the Primary Depth Control (PDC) log for well 06-02A. * FORMAT RECORD (TYPE# 64) Data record type is: 0 Datum Frame Size is: 28 bytes Logging direction is down (value= 255) Optical Log Depth Scale Units: Feet Frame spacing: 0.500000 Frame spacing units: [F ] Number of frames per record is: 36 One depth per frame (value= 0) Datum Specification Block Sub-type is: 1 FRAME SPACE = 0.500 * F ONE DEPTH PER FRAME Tape depth ID: F 6 Curves: Name Tool Code Samples Units Size Length Page 5 tapescan.txt 1 GR MWD 68 1 AAPI 4 4 2 ROP MWD 68 1 F/HR 4 4 3 RAD MWD 68 1 OHMM 4 4 4 RAS MWD 68 1 OHMM 4 4 5 RPD MWD 68 1 OHMM 4 4 6 RPS MWD 68 1 OHMM 4 4 24 Total Data Records: 97 Tape File Start Depth = 9714. 500000 Tape File End Depth = 11448.000000 Tape File Level Spacing = 0. 500000 Tape File Depth Units = feet **** FILE TRAILER **** Tape subfile: 2 110 records. . . Minimum record length: 54 bytes Maximum record length: 4124 bytes **** FILE HEADER **** MWD .002 1024 *** LIS COMMENT RECORD *** 1111 , 111111 11 111 1 Remark File version 1.000 This file contains the raw-unedited field MWD data. * FORMAT RECORD (TYPE# 64) Data record type is: 0 Datum Frame size is: 28 bytes Logging direction is down (value= 255) optical Log Depth Scale units: Feet Frame spacing: 0.250000 Frame spacing units: [F ] Number of frames per record is: 36 One depth per frame (value= 0) Datum specification Block Sub-type is: 1 FRAME SPACE = 0.250 * F ONE DEPTH PER FRAME Tape depth ID: F 6 Curves: Name Tool Code samples Units size Length Page 6 tapescan.txt 1 GR MWD 68 1 AAPI 4 4 2 ROP MWD 68 1 F/HR 4 4 3 RAD MWD 68 1 OHMM 4 4 4 RAS MWD 68 1 OHMM 4 4 5 RPD MWD 68 1 OHMM 4 4 6 RPS MWD 68 1 OHMM 4 4 24 Total Data Records: 194 Tape File Start Depth = 9712.000000 Tape File End Depth = 11450.750000 Tape File Level Spacing = 0.250000 Tape File Depth units = feet **** FILE TRAILER **** Tape Subfile: 3 207 records. . . Minimum record length: 54 bytes Maximum record length: 4124 bytes **** TAPE TRAILER **** MWD 11/05/02 3759970 01 **** REEL TRAILER **** MWD 11/08/18 BHI 01 Tape Subfile: 4 2 records. . . Minimum record length: 132 bytes Maximum record length: 132 bytes 0 Tape Subfile 1 is type: LIS 0 Tape Subfile 2 is type: LIS DEPTH GR ROP RAD RAS Page 7 tapescan.txt RPD RPS 9714.5000 -999.2500 -999.2500 -999.2500 -999.2500 -999.2500 -999.2500 9715.0000 -999.2500 -999.2500 -999.2500 -999.2500 -999.2500 -999.2500 11448.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Tape File Start Depth = 9714.500000 Tape File End Depth = 11448.000000 Tape File Level Spacing = 0.500000 Tape File Depth units = feet 0 Tape Subfile 3 is type: LIS DEPTH GR ROP RAD RAS RPD RPS 9712.0000 -999.2500 -999.2500 -999.2500 -999.2500 -999.2500 -999.2500 9712.2500 -999.2500 -999.2500 -999.2500 -999.2500 -999.2500 -999.2500 11450.7500 -999.2500 -999.2500 -999.2500 -999.2500 -999.2500 -999.2500 Tape File Start Depth = 9712.000000 Tape File End Depth = 11450.750000 Tape File Level Spacing = 0.250000 Tape File Depth units = feet 0 Tape Subfile 4 is type: LIS Page 8