Department of Commerce, Community, and Economic Development
Alaska Oil and Gas Conservation
Commission
HOME
EVENTS
DATA
Data List
Drilling
Production
Orders
Data Miner
Document Search
REPORTS
Reports and Charts
Pool Statistics
FORMS
LINKS
Links
Test Notification
Data Requests
Regulations
Industry Guidance Bulletins
How to Apply
ABOUT US
History
Staff
HELP
Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
211-060
PTD /1 -e. , • • Loepp, Victoria T (DOA) From: NSK Well Integrity Supv CPF3 and WNS <n2549@conocophillips.com> Sent: Friday, December 15, 2017 9:14 AM To: Loepp,Victoria T(DOA) Cc: Senden, R.Tyler Subject: CRU CD4-208 (PTD 211-060)IA Sustained Casing Pressure Follow Up Flag: Follow up Flag Status: Flagged Victoria, Alpine producer CRU CD4-208 (PTD 211-060)is being reported for sustained casing pressure of the IA exceeding 2000 psi as a result of an open gas lift mandrel pocket and deferred wellwork. The IA pressure previously increased above 2000 psi after the OV was intentionally pulled during planned wellwork. CPAI is reporting the well because the wellwork has been temporarily deferred for logistical reasons in addition to weather delays,and the IA pressure is expected to remain high(near 2450 psi at present) until further wellwork is commenced and completed. The well has 7",26 lb/ft, L-80 grade production casing with a burst pressure rating of 7240 psi. CPAI will continue to monitor the well's condition while a wellwork plan forward is progressed. Please let us know if you have any questions or disagree with this plan. Regards, Rachel Kautz/Travis Smith Well Integrity Supervisor,ConocoPhillips Alaska Inc. Office:907-659-7126 Cell:907-943-0450 %Dp t r ,E c, 1 • • PTD Z /< —" Loepp, Victoria T (DOA) From: NSK Problem Well Supv <n1617@conocophillips.com> Sent: Saturday, October 08, 2016 5:22 PM To: Loepp,Victoria T(DOA) Cc: Senden, R.Tyler; NSK Problem Well Supv Subject: Alpine producer CD4-208A(PTD 211-060)was reported today with SCP of the IA. Attachments: CD4-208A TIO plot.JPG;CD4-208A.pdf Follow Up Flag: Follow up Flag Status: Flagged Victoria- Alpine producer CD4-208A(PTD 211-060)was reported today with SCP of the IA. The IA was reported at 2038 psi. Operations attempted to bleed the IA but the pressure built back immediately. The well has 7"26Ibs L-80 pipe which has a pressure rating of 7240 psi. A plan forward is being formulated and slick line will start diagnostics as soon as reasonably possible. The well is currently shut in and will be until diagnostics are completed. Attached are the 90 day TIO plot and well bore schematic. Dusty Freeborn/Jan Byrne Well Integrity Supervisor ConocoPhillips Alaska, Inc. Office phone: (907)659-7126 Cell phone: (907)943-0450 41ir LLS TEAM nouN.a►ps SCANNED FET 2 32017, 1 WNS PROD CD4-208A ConocoPhillips ; Well Attributes Max Angle&MD TO Alaska,Inc. Wellbore API/U'M Field Name Wellbore Status i ncl(°) MD(ftK8) Act Btm(ftK8) [umtarilhdkps 501032051701 NANUO PROD I 95.94 19,221.14 19,289.0 ••• •`F, Comment H2S(ppm) Date Annotation End Date KB-Grd(ft) Rig Release Date CD4-200A,3/2220151194:25 AM SSSV:WRDP Last WO: 4/12/2011 43.73 1224/2005 Vertical sdxrnule(actual) 'Annotation Depth(ftK8) End Date Annotation Last Mod By End Date ��IIII�� Last Tag: Rev Reason:RE-SET WRDP reheat 3/22/2015 HANGER;31 6 Casing Strings Casing Description OD(in) ID(in) Top(ftK8) Set Depth(ftK8) Set Depth(TVD)...Wt/Len(1...Grade Top Thread -J CONDUCTOR 16 15.250 36.3 114.0 114,0 65.00 H-40 WELDED L�I [ Casing Description OD(in) ID(in) Top OMB) Set Depth(111(6) Set Depth(TVD)...WIILen(I...Grade Top Thread Jll-al SURFACE 9 5/8 8.835 37.1 2,594.3 2440.2 40.00 L-80 BTC Casing Description OD(in) ID(in) Top(11(8) Set Depth(111(8) Set Depth(ND)...Wt/Len(i...Grade Top Thread PRODUCTION 7 6.276 34.7 12252.5 7,393.5 26.001-80 BTC-M isji Casing Description OD(in) ID(in) Top(MB) Set Depth(11(8) Set Depth(ND)...WI/Len(I...Grade Top Thread OPEN HOLE 6 1/8 6.125 14,408.0 19,289.0 7,463.9 Caning Description OD lin) ID(in) op IftKB) Sat Depth(ftK8) Set Depth(TVD)...WBLen(I...Grade Top Thread CONDUCTOR;36.3-114.0-i ` LINER 4 12 3.958 11,966.9 14,408.5 7,413.3 12.60 L-80 IBTM Liner Details NIPPLE;22:050511.44 ,051 Nominal ID WRDP;2,051441 ( INE Top(1B(B) Top(ND)(IB(e) Top not(°) Item Des Cern (in) 11,966.9 7,274.9 64.50 SLEEVE Baker HRD Liner Setting Sleeve 4.380 -- 11,979.1 7,2802 64.59 NIPPLE Baker"RS"Packet(Nipple 4.250 11,981.7 7,281.3 64.61 HANGER Baker"DG"Flex-Lock Liner Hanger 4.350 11,991.0 7,285.3 64.68 XO-Reducing -XO 5"Hyd 521 Box by 4 1/2"SLHT Pin 3.958 • i1 Tubing Strings SURFACE;37.l-2594.3) Tubing Description String Ma...ID(in) Top(11KB) Set Depth(ft..Set Depth(TVD)(...Wt(Ib/ft) Grade Top Connection TUBING 41/2 3.958 31.6 11,973.9 7,277.9 12.601-80 IBTM fir- Completion Details GAS UFT;3,863.1 7� Nominal ID ,Top(Po(B) Top(ND)(ftK8) Top Incl(°) Item Des Corn (in) 31.6 31.6 0.00 HANGER FMC Tubing Hanger 10.85"OD 4"Flow Bore 4.500 2,051.4 1,959.5 27.23 NIPPLE CAMCO BP-6i Nipple w/3.813"DB Profile 8 DB Lock 2.250 (i 11,135.9 6,915.5 64.16 GUAGE CAMCO SGM-NPG-CA Gauge 3.958 11,688.9 7,154.5 65.59 PACKER Baker Premier Production Packer Set Press 2700 Psi 3.870 --- (PKR#2) GAS LIFT;al 18.1317,750.1 7,180.1 64.80 NIPPLE HES 3.813"XN"Nipple w/3.725"No-Go 3.725 11,814.0 7,207.9 63.62 PBR Baker 80-47 Polished Bore Receptacle 4.750 - 11,847.6 7,222.8 63.77 PACKER Baker Premier Production Packer Set Press 2700 Psi 3.870 - 11,909.7 7,250.1 64.07 NIPPLE HES 3.813"XN"Nipple w/3.725"No-Go 3.725 GUAGE;11,135.9 Ma 11,972.9 7,277.5 64.55 WLEG Baker Wireline Re-entry Guide 3.980 Other In Hole(Wireline retrievable plugs,valves,pumps,fish,etc.) -- Top(ND) Top incl Top(ftK8) (ttKB) 1") Des Com Run Date ID(in) ------- 2,051.4 1,959.5 27.23 WRDP SET WRDP-2 WITH PACKING OF 3.84"(NABS- 7/24/2014 0.000 GAS LIFT;11,5784 0557) Mandrel Inserts St ati O° Top(TVD) Valve Latch Pat Size TRO Run N Top(M(8) (11KB) Make Model OD(in) Sery Type Type (In) (psi) Run Date Com PACKER;118889MI 1 3,863.1 3,442.8 CAMCO KBG-4- 5 1 GAS LIFT DMY BK-5 0.000 0.0 6/30/2011 ----- 2 8,118.8 5,619.2 CAMCO KBG-4- 1 GAS LIFT GLV BK 0.188 1,928.0 7/42011 5 NIPPLE;11,750.1 VI 3 11,5784 7,109.2 CAMCO KBG-2 1 GAS LIFT OV BK 0.250 0.0 7/4/2011 1. Notes:General&Safety ...-__ End Date Annotation __ 12/6/2009 NOTE:VIEW SCHEMATIC w/Alaska Schematic9.0 s 7/13/2011 NOTE:WELL SIDETRACKED TO'A' PBR;11 8140 7/13/2011 NOTE:Tbg landed w/seal assy spaced 9.75'off fully located In PBR.No seals on assy. S { PACKER;110476 PR NIPPLE',11,909.7 IN WLEG;11,9729 0. PRODUCTION;34.7-12,252.5 LINER;11,958.9-14,408.5 111711.. OPEN HOLE;14,408.0-19,289.0 O I 'E 1 O N yce 2U sfa' o • OWL n � 1V2 n O Wat b I CL W N 0 Q W U 0� a) _co O Oc 1 _ p r d O f- co H a EO p 0-0 CC 00 N 0ma Om E 0 ' 0 0 2q O J x ,-Et Z o v =00 a m3o v 0o > m� CO m m m Er_ 0Qa;c aWo 2Q r a.III a a a a � I c 0 a c 0I �,� I I a C)o 0 0 0 o O o 0 0 0 0 0 lI J 0 N C)I N N N N N N N N N N N N O 1 0) p re N N N N N N V V V N N U r O J - N N N N y Z 1 N- - r I- N- n W ao a0 W 1- n +D _ E C y Q 7h e c c c c c c c c c c c Y Til N N N N N N N N 0 N N N E c O U a a a a a a a a a a a a I— < Y O O 0 O O 0 0 0 0 0 0 0 o Lf J c 0 O 4ca cc�� co o co d j f6 O N (D N co 0 N I,- co n N N N d CL ..1 V 'O i To (.1) O Q) n ,- N- O O O 0.... � N W d C t•'I 0 0 0 0 0 0 w Z Cie O O co N- M CO CO (D (0 0 0 O IC) co (D U) R M M M M U) U) C) CO N N N N N N N N W Z J ! >ZOUO _u c7 0 aQ Y N 1 QZ J a o AI, 0 co o II, gym ' o 0 0 0 c a N o ZI J 2 0 0 0 0 co r O a) y1 a) O Ccil a m1.0 10 E a 1 co N N N CO Q 0 17 0 E I -i u) co J 0 0 Q N I I1 QH 0 I o r I— I i ( 0 N 03 re izz: c J —> 0 v) Q J O c1 0I— a) o Q 0 D. ZI i w w Z o oCC W > m> >V1 > > m >▪ > m > m aQ m 0 1 c c CC = 1 c9 � a) N a) cn iA 0 0 v is m g 1 c c c c c c c c c c w Vv'_ y ii- 0 0 HflW o v a c c c c r 0 0 0 0 J J co u) E ) �, L o L O > O J L 0 _ 00) O w O• 1- I- L t) 2E v N 2 ZO O c W 0 Z 1 a)) 0 Z. .- aEO ° _ E E E ` rn Z1 V LL Qy , y NN CO CO CO Zp O W w Cp " J O N J Q Q in a)y ow 0 a ►- a y al a �0 0 0 0 0 o a a 0 0 a a y O 0 I- J 0 FT W W J J J J CC a' W W R a' 0 T c n T I c Z N O N ,1:4-Th O Z i' Et: Q s J_ Z 17-13 ilira L J L Q O W a 0 Z Z -I 0 (:) G 1 CL 71 W a Ce 0 a� W Z J n o 8 ( o7.5 N N O Q O Z H o ch o C I • 3 U7 O 0a 02 i-,13 in TE cm N° as ° le N O 0 LL D. E U = co a cc Q o i U I— I Z o N n w /� J , / J J a co Q O0 Q O a Z o Q -al 0 is Z I r I Z O c j He m T .... N d u_ Z ,' ani N Q' 0 co Q cs. ._ u O ol Z N N --O• „,• c as Ua Ta) E a m RECEIVED JUL 172013 WELL LOG TRANSMITTAL AOGCC To: Alaska Oil and Gas Conservation Comm. July 1, 2013 Attn.: Makana Bender 333 West 7th Avenue, Suite 100 J f I © (ed Anchorage, Alaska 99501 RE: Gamma Ray/CCL Log: CD4-208A Run Date: 6/30/2013 c% t4 7 The technical data listed below is being submitted herewith. Please address any problems or concerns to the attention of: Matthew Cook, Halliburton Wireline&Perforating, 6900 Arctic Blvd., Anchorage, AK 99518 CD4-208A Digital Data in LAS format,Digital Log Image file 1 CD Rom 50-103-20517-01 PLEASE ACKNOWLEDGE RECEIPT BY SIGNING AND RETURNING A COPY OF THE TRANSMITTAL LETTER TO THE ATTENTION OF: Halliburton Wireline&Perforating Attn: Matthew Cook 6900 Arctic Blvd. Anchorage, Alaska 99518 Office: 907-273-3572 Fax: 907-273-3535 matthew.cook@hal ' urton.com Date: Signed: Halliburton Sperry Drilling 6900 Arctic Blvd Anchorage, AK 99518 August 23, 2011 AOGCC Christine Mahnken 333 W. 7th Ave., Suite 100 Anchorage, AK 99501 Dear Sir or Madam: Subject: CD4-208A/CD4-208APB1 Definitive Survey Reports Enclosed are two hard copies(NAD83 and NAD27)of the definitive well path. Also enclosed is a disc containing an electronic export of the survey data. Please acknowledge receipt by sending an email to Avinash.Ramjit@Halliburton.com or by signing and returning a copy of this letter to the following address: Halliburton Sperry Drilling ATTN: Avinash Ramjit 6900 Arctic Blvd Anchorage, AK 18 Received by: tu Date: 3t4 IL/ � AZ Please contact me at 907.263.4657 with questions or concerns. Regards, Avinash Ramjit STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMMISSION WELL COMPLETION OR RECOMPLETION REPORT AND LOG la.Well Status: Oil ❑ Gas ❑ SPLUG ❑ Other ❑ Abandoned ❑ Suspended ❑ lb.Well Class: 20AAC 25.105 20AAC 25.110 Development ❑✓ Exploratory ❑ GINJ ❑ WINJ ❑ WAG ❑ WDSPL ❑ No.of Completions: Service ❑ Stratigraphic Test❑ 2.Operator Name: 5.Date Comp.,Susp., 12.Permit to Drill Number: ConocoPhillips Alaska, Inc. orAband.: July 1,2011 211-060/311-187 3.Address: 6.Date Spudded: 13.API Number: P.O. Box 100360,Anchorage,AK 99510-0360 May 17,2011 50-103-20517-01 4a.Location of Well(Governmental Section): 7.Date TD Reached: 14.Well Name and Number: Surface: 2918'FNL,206'FEL,Sec.24,T11N,R4E,UM June 23,2011 CD4-208A/CD4-208APB1 Top of Productive Horizon: 8.KB(ft above MSL): 56'RKB 15.Field/Pool(s): 56'FNL, 1044'FWL,Sec.31,T11N,R5E, UM GL(ft above MSL): 19.8' Colville River Field Total Depth: 9.Plug Back Depth(MD+TVD): 1773'FNL, 2195'FEL,Sec.6,T1 ON, R5E UM 19289'MD/7464'TVD Alpine Oil Pool 4b.Location of Well(State Base Plane Coordinates,NAD 27): 10.Total Depth(MD+TVD): 16.Property Designation: Surface: x-378039 y- 5957494 Zone-4 19289'MD/7464'TVD ADL 384209,388903,380077,384211,380044 TPI: x-379163 y- 5949776 Zone-4 11.SSSV Depth(MD+TVD): 17.Land Use Permit: Total Depth: x-380834 y- 5942753 Zone-4 nipple @ 2051'MD/1960'TVD 380077 18.Directional Survey: Yes ❑✓ No❑ 19.Water Depth,if Offshore: 20.Thickness of Permafrost MD/TVD: (Submit electronic and printed information per 20 AAC 25.050) N/A (ft MSL) 1647'MD/1600'TVD 21.Logs Obtained(List all logs here and submit electronic and printed information per 20 AAC 25.071): 22.Re-drill/Lateral Top Window MD/TVD GR/Res 5776'MD/4493'TVD 23. CASING,LINER AND CEMENTING RECORD SETTING DEPTH MD SETTING DEPTH ND HOLE AMOUNT CASING SIZE WT.PER FT. GRADE TOP BOTTOM TOP BOTTOM SIZE CEMENTING RECORD PULLED 16" 65# H-40 36' 114' 36' 114' 42" Portland Type III 9.625" 40# L-80 36' 2594' 36' 2440' 12.25" 530 sx ASLite,230 sx Class G 4`. tt 7" / 26# L-80 36' 12253' 36' 7393' 8.75" 016 sx Class , 95 sx Class G 4.5" 12.6# L-80 11967'1 14409' 1 7275' 7414' 6.125" slotted liner l 5; Z,,,T 5 I-1r $#t 24.Open to production or injection? Yes 0 N ❑ If Yes,list each 25. TUBING RECORD d Interval open(MD+TVD of Top&Bottom;Perforation Size and Number): SIZE DEPTH SET(MD) PACKER SET(MD/ND) 4.5" 11974' 11689'MD/7175'TVD, slotted liner 11848'MD/7223'TVD 11967'-14409'MD 7275'-7414'TVD iki()m('Ltf'li}t'Z o 26. ACID,FRACTURE,CEMENT SQUEEZE,ETC. DAncti DEPTH INTERVAL(MD) AMOUNT AND KIND OF MATERIAL USED isolation plug 9714'-10414' 67 bbls Class G AN a} T '4 ,........._........),A isolation plug#2 9001'-9721' 70 bbls Class G r 81 ,� 41' !7""'''' isolation plug#3 7868'-9001' 72 bbls Class G Is,` 27. PRODUCTION TEST Date First Production Method of Operation(Flowing,gas lift,etc.) July 7,2011 gas lift oil Date of Test Hours Tested Production for OIL-BBL GAS-MCF WATER-BBL CHOKE SIZE GAS-OIL RATIO 7/11/2011 6 hours Test Period--> 2724 1452 0 100% 757 Flow Tubing Casing Pressure Calculated OIL-BBL GAS-MCF WATER-BBL OIL GRAVITY-API(corr) Press. 476 psi 1835 24-Hour Rate-> 10068 7622 0 not available 28. CORE DATA Conventional Core(s)Acquired? Yes ❑ No ❑ Sidewall Cores Acquired? Yes ❑ No ❑ If Yes to either question,list formations and intervals cored(MD+TVD of top and bottom of each),and summarize lithology and presence of oil,gas or water (Submit separate sheets with this form,if needed).Submit detailed descriptions,core chips,photographs and laboratory analytical results per 20 AAC 25.071. RECF \IFD NONE An 0 2 2011 RBDMS AUG 0 2 2011 p;pt;s ail& E;AA C64.6.69ii nission Form 10-407 Revised 12/2009 CONTINUED ON REVERSE Anchorage Submit original only /f fig 28. GEOLOGIC MARKERS(List all formations and markers e. ,tered): 29. FORMATION TESTS NAME MD TVD Well tested? ❑ Yes u No If yes,list intervals and formations tested, Permafrost-Top ground surface ground surface briefly summarizing test results. Attach separate sheets to this form,if Permafrost-Bottom 1647' 1600' needed,and submit detailed test information per 20 AAC 25.071. Top K-2 5029' 4194' Base K-2 5229' 4197 Kuparuk C 10628' 6692' Alpine C 11555' 7099' N/A CD4-208APB1 TD 11703' 7376' Formation at total depth: Alpine C 30. LIST OF ATTACHMENTS Summary of Daily Operations,schematic,final directional surveys 31. I hereby certify that the foregoing is true and correct to the best of my knowledge. Contact: 4 266 nderson ' 5-6403 L I Z�i/1-1.1 WAS Fe It Na„�` FMR Printed Named G. L.Alvord Title: Alaska Drilling Manager $ l um Signature �j�'"" Phone 265-6120 Date 6/21 INSTRUCTIONS General: This form is designed for submitting a complete and correct well completion report and log on all types of lands and leases in Alaska. Submit a well schematic diagram with each 10-407 well completion report and 10-404 well sundry report when the downhole well design is changed. Item 1a: Classification of Service wells: Gas injection,water injection,Water-Alternating-Gas Injection,Salt Water Disposal,Water Supply for Injection,Observation,or Other.Multiple completion is defined as a well producing from more than one pool with production from each pool completely segregated. Each segregated pool is a completion. Item 4b: TPI(Top of Producing Interval). Item 8: The Kelly Bushing and Ground level elevations in feet above mean sea level. Use same as reference for depth measurements given in other spaces on this form and in any attachments. Item 13:The API number reported to AOGCC must be 14 digits(ex:50-029-20123-00-00). Item 20:Report true vertical thickness of permafrost in Box 20. Provide MD and TVD for the top and base of permafrost in Box 28. Item 22: Attached supplemental records for this well should show the details of any multiple stage cementing and the location of the cementing tool. Item 23: If this well is completed for separate production from more than one interval(multiple completion),so state in item 1,and in item 23 show the producing intervals for only the interval reported in item 26. (Submit a separate form for each additional interval to be separately produced,showing the data pertinent to such interval). Item 26: Method of Operation: Flowing,Gas Lift,Rod Pump,Hydraulic Pump,Submersible,Water Injection,Gas Injection,Shut-in,or Other (explain). Item 27: Provide a listing of intervals cored and the corresponding formations,and a brief description in this box.Submit detailed description and analytical laboratory information required by 20 AAC 25.071. Item 29:Provide a list of intervals tested and the corresponding formation,and a brief summary of this box.Submit detailed test and analytical laboratory information required by 20 AAC 25.071. Form 10-407 Revised 12/2009 WNS CD4-208A v Ctrl quip$ Well Attributes Max Angle&MD TD• - Atask3 Inc - wallborerPWWI F M Name Well Status Incl(') MD(ftKB) Act Btm(ftKB) ts>n�,I, r, 501032051701___NANUQ _ IPROD 1 95 94 I 19,221 1-1 19,289.0 Last Tag: (ppm) Rev Reason:SIDETRACK End Date KB-Grd(ft) Rig Release Date merit 1125 we�Co -.0.44:2p65,T/114)7^g;2Q.S5AM_w...,. SSSV:NIPPLE I 'Date (Last W0: � 43/s 12/24/2005 Sdtemakio AdvaL__..___.._,v_ M oafio Depth(ftK6) End Date Annotation Last Mod E d Date-- I nlnakn 17/13/2011 Casing Strings Casing Description String 0... String ID...Top(ftKB) Set Depth(f...Set Depth(ND)...String Wt...String...String Top Thrd HANGER,32 --41111- +e'- CONDUCTOR 16 15.250 36.3 114.0 114065.00 H-40 WELDED -Casing Description String 0... String ID...Top(ftl(B) Sat DpM(f...Set DepM(TVD) NN...String...String Top Thrd •' - SURFACE 95/8 8.835 36.2 2,594.3 2,440.2 40.00 L-80 BTC Casing Description String 0... String ID .Top(ftKB) Set Depth(f...Set Depth(TVD)...String Wt...String...String Top Thrd 1 �I , PRODUCTION 7 6.276 34 7 12252.5 7,393.0 26.00 L-80 BTC-M 80Corsi Oestri Stin O._ Stin ID...To (ftKB Sat ng prion 9 9 p ) DepM(L..Set DpM(71/D)...String WL..Sting...String Tp ThrdiL OPENHOLE 61/8 6 125 14,4080 19289.0 7,463.9 T- Casing Descriptionon String 0... String ID...Top(ftKB) Set Depth(f...SettDepth(TVD) String Wt.../String...String Top Thrd Ir _ ;,,- LINER 4 1/2 3 958 . 11 966 9 14 408.5 7,413.5 12.60 L 80 IBTM CONDUCTOR. - Liner Details _ 36-t 14 . Top Depth la va rs. y.; (TVD) TpI I Nomi... NIPPLE,2,851- Top(NKg) (ftKB) () Nan Descr ption Comment ID(in) WROP,2,851-- 4 11,966.9 7,275.0 64.75 SLEEVE Baker HRD Liner Setting Sleeve 4.380 11,979.1 7,280.2 64 76 NIPPLE Baker"RS"Packoff Nipple 4.250 I P }te - -- - - 11,981.7 7,281.3 64.76 HANGER Baker"DG"Flex-Lock Liner Hanger 4.350 0 IA 11,991.0 7,285.3 64 76 XO-Reducing XO 5"Hyd 521 Box by 4 1/2"SLHT Pin 3.958 SURFACE, VQ Tubing Strings 362,594 Tubing Description String 0... 'String ID...Top(ftKB) Set Depth(f...Set Depth(ND)..String Wt...String...String Top Thrd iii;: TUBING 41/2 I 3.958 31.6 I 11,973.9 I 7,278.0 12.60 L-80 I IBTM GAS LIFT, Completion Details 3.883 Top Depth 'i' (TVD) Top Ind Nomi... Top(MB) (MlT3) (7 It....Dso+iption Comment ID(In) ' 31.6 31.6 -0.03 HANGER FMC Tubing Hanger 10.85"OD 4"Flow Bore 4.500 r F 2,051.4 1,959.5 27.23'NIPPLE CAMCO BP-61 Nipple w/3.813"DB Profile 8 DB Lock 2.250 11,135.9 6,915.6 64.28 GUAGE CAMCO SGM-NPG-CA Gauge 3.958 11,688.9 7,154.7 65.98 PACKER Baker Premier Production Packer Set Press 2700 Psi(PKR 112) 3.870 n _ 11,750.1 7,180.2 64.80 NIPPLE HES 3.813"XN Nipplew/3.725"No-Go 3725 ll, 11,804.3 7,203.6 63.76 SEAL ASSY Baker 80-47 Seal Assembly,Space Out From Fully Located 3.880 GAS LIFT. f' 11,814.0 7,207.2 63.34 PBR Baker 80-47 Polished Bore Receptacle 4.750 ' 11,847.6 7,222.5 63.60 PACKER Baker Premier Production Packer Set Press 2700 Psi 3.870 .... .._,. 14_ -�i 11,909.7 /2Sl1 fi 64.74 NIPPLE HES 3.813"XN"Nipple w/3.725"No-Go 3.725 11.972.9 /2//5 64.75 WLEG Baker Wireline Extension Guide 3.980 Other In Hole(Wireline retrievable plugs valves,pumps,fish,etc.) Top Depth (TVD) Top Inc! Tp(itl(B) MKS/ ('1 IFFI Description Comment Run Date ID(M) M., 2,051 1,959.5 2/.231WRDP 13.81"DB LOCK ON WRDP-2(NABS-0557) 7/4/2011 GUAGE,11,136 Notes:General&Safety -__-_-. .. -_:._---_----- -----_-_-_ friEnd Date Annotation 12/6/2009 NOTE:VIEW SCHEMATIC w/Alaska Schematic9.0 ri- 7/13/2011 NOTE:Tbg landed w/seal assy spaced 9.75'o8 fully located in PBR.No seals on assy. GAS LIFT, 11,578 I Ih, PA10ER,,689-_.. 11 ----�) NIPPLE,11,750-_ I SEAL ASSY, 11,804 �. e. PBR,11,814 - PA( 11,868a-A- ..J NIPPLE,11,910-" f LA , Iii „1 WLEG,11,973 - ..-_. I'I i; Ir Mandrel Details rt Top Depth Top ', Port (TVD) Incl OD Valve Latch S¢e TRO Run Stn Top(ftKB) (ftKB) () Make Model (in) Sery Type Type (in) (pal) Run Date Com... 1 3863.1 3,442.6 50.90 CAMCO KBG-4-5 1 GAS LIFT DMY BK-S 0.000 0.0 6/30/2011 2 8,118.8 5,619.2 65.50 CAMCO KBG-4-5 1 GAS LIFT GLV BK 0.188 1,928.0 7/4/2011 3 11,578.4 7,109.0 65 52 CAMCO KBG-2 1GAS LIFT OV BK 0.250 0.0 7/4/2011 7 PRODUCTION, 35-12,253 LINER, 11,967-14,408 OPEN HOLE, II 14,408-19,289 TD(CD4-208A), 19,289 lx E X iOb sd, A ConocoPhillips(Alaska) Inc. Western North Slope WNS Non-pad a CD4-208A / I ftr 501032051701 I ftf it a 44 tk Sperry Drillinc, Definitive Survey Report •I 27 June, 2011 R 1 vfli 8+ tp la HALLIBURTON Sperry Drilling ConocoPhillips (Alaska) Inc. Definitive Survey Report Company: ConocoPhillips(Alaska)Inc. Local Co-ordinate Reference: Well CD4-208 Project: Western North Slope TVD Reference: CD4-208 @ 55.95ft Site: WNS Non-pad MD Reference: CD4-208 @ 55.95ft Well: CD4-208 North Reference: True Wellbore: CD4-208A Survey Calculation Method: Minimum Curvature Design: CD4-208A Database: CPAI EDM Production Project Western North Slope Map System: US State Plane 1927(Exact solution) System Datum: Mean Sea Level Geo Datum: NAD 1927(NADCON CONUS) Using Well Reference Point Map Zone: Alaska Zone 04 Using geodetic scale factor i Well CD4-208,Alpine CD4 Well Position +N/-S 0.00 ft Northing: 5,957,492.98 ft Latitude: 70° 17'32.618 N +EI-W 0.00 ft Easting: 378,038.29 ft Longitude: 150°59'14.723 W Position Uncertainty 0.00 ft Wellhead Elevation: ft Ground Level: 19.808 Wellbore CD4-208A Magnetics Model Name Sample Date Declination Dip Angle Field Strength (0) (°) (nT) BGGM2011 6/6/2011 20.49 80.75 57,601 Design CD4-208A Audit Notes: Version: 1.0 Phase: ACTUAL Tie On Depth: 5,698.95 Vertical Section: Depth From(TVD) +14/S +E/-W Direction (ft) (ft) (ft) (0) 36.15 0.00 0.00 154.00 Survey Program Date From To (ft) (ft) Survey(Wellbore) Tool Name Description Survey Date 80.00 438.10 CD4-208PB1 Gyro(CD4-208PB1) CB-GYRO-SS Camera based gyro single shot 12/12/2005 12. 476.13 2,617.63 CD4-208PB1 IIFR(CD4-208PB1) MWD+IFR-AK-CAZ-SC MWD+IFR AK CAZ SCC 12/12/2005 12. 2,629.82 5,698.95 CD4-208APB1 MWD(R100)(CD4-208A MWD+IFR-AK-CAZ-SC MWD+IFR AK CAZ SCC 5/17/2011 12:C 5,767.00 19,221.14 CD4-208A MWD(R400)(CD4-208A) MWD+IFR-AK-CAZ-SC MWD+IFR AK CAZ SCC 6/2/2011 12:0C Survey Map Map Vertical MD Inc Azi TVD TVDSS +14/-S +E/-W Northing Easting DLS Section (ft) (0) (0) (ft) (ft) (ft) (ft) (ft) (ft) (°/1001 (ft) Survey Tool Name 36.15 0.00 0.00 36.15 -19.80 0.00 0.00 5,957,492.98 378,038.29 0.00 0.00 UNDEFINED 80.00 0.30 323.00 80.00 24.05 0.09 -0.07 5,957,493.07 378,038.22 0.68 -0.11 CB-GYRO-SS(1) 169.00 0.40 334.00 169.00 113.05 0.56 -0.35 5,957,493.54 378,037.95 0.13 -0.65 CB-GYRO-SS(1) 259.00 0.75 331.00 258.99 203.04 1.35 -0.77 5,957,494.34 378,037.54 0.39 -1.55 C8-GYRO-SS(1) 349.00 0.30 325.00 348.99 293.04 2.06 -1.19 5,957,495-06 378,037.13 0.50 -2.38 CB-GYRO-SS(1) 438.00 0.15 252.00 437.99 382.04 2.22 -1.43 5,957,495.22 378,036.89 0.33 -2.62 CB-GYRO-SS(1) 476.13 0.25 256.78 476.12 420-17 2.18 -1.56 5,957,495.18 378,036.76 0.27 -2.65 MWD+IFR-AK-CAZ-SC(2) 566.78 1.47 155.15 566.76 510.81 1.08 -1.27 5,957,494.08 378,037.04 1.70 -1.53 MWD+IFR-AK-CAZ-SC(2) 656.28 2.54 151.45 656.20 600.25 -1.70 0.16 5,957,491.27 378,038.42 1.20 1.60 MWD+IFR-AK-CAZ-SC(2) 744.90 4.26 149.40 744.66 688.71 -6.26 2.78 5,957,486.67 378,040.96 1.95 6.84 MWD+IFR-AK-CAZ-SC(2) 835.36 5.81 151.84 834.77 778.82 -13.19 6.65 5,957,479.68 378,044.72 1.73 14.77 MWD+IFR-AK-CAZ-SC(2) 6/27/2011 9:26:32AM Page 2 COMPASS 2003.16 Build 69 t onocoPhillips (Alaska) Inc. Definitive Survey Report Company: ConocoPhillips(Alaska)Inc. Local Co-ordinate Reference: Well CD4-208 Project: Western North Slope TVD Reference: CD4-208 @ 55.95ft Site: WNS Non-pad MD Reference: CD4-208 @ 55.95ft Well: CD4-208 North Reference: True Wellbore: CD4-208A Survey Calculation Method: Minimum Curvature Design: CD4-208A Database: CPAI EDM Production Survey Map Map Vertical MD Inc Azi TVD TVDSS +N/-S +E/-W Northing Easting DLS Section (ft) (0) (°) (ft) (ft) (ft) (ft) (ft) (ft) (°/100') (ft) Survey Tool Name 931.25 9.59 154.91 929.78 873.83 -24.71 12.33 5,957,468.08 378,050.21 3.96 27.61 MWD+IFR-AK-CAZ-SC(2) 1,026.45 13.41 162.98 1,023.06 967.11 -42.45 18.93 5,957,450.23 378,056.52 4.34 46.45 MWD+IFR-AK-CAZ-SC(2) 1,121.76 17.10 170.42 1,115.00 1,059.05 -66.85 24.50 5,957,425.75 378,061.69 4.38 70.82 MWD+IFR-AK-CAZ-SC(2) 1,217.19 20.64 173.35 1,205.29 1,149.34 -97.40 28.78 5,957,395.13 378,065.48 3.84 100.16 MWD+IFR-AK-CAZ-SC(2) 1,312.20 21.20 173.36 1,294.04 1,238.09 -131.09 32.71 5,957,361.38 378,068.86 0.59 132.16 MWD+IFR-AK-CAZ-SC(2) 1,407.83 23.61 170.23 1,382.45 1,326.50 -167.15 37.96 5,957,325.25 378,073.52 2.81 166.87 MWD+IFR-AK-CAZ-SC(2) 1,502.00 24.68 170.86 1,468.38 1,412.43 -205.14 44.28 5,957,287.16 378,079.23 1.17 203.79 MWD+IFR-AK-CAZ-SC(2) 1,597.23 24.85 170.91 1,554.85 1,498.90 -244.53 50.60 5,957,247.68 378,084.91 0.18 241.97 MWD+IFR-AK-CAZ-SC(2) 1,692.74 26.28 167.13 1,641.01 1,585.06 -284.97 58.48 5,957,207.12 378,092.13 2.27 281.76 MWD+IFR-AK-CAZ-SC(2) 1,787.88 27.42 168.61 1,725.89 1,669.94 -326.98 67.50 5,957,164.98 378,100.47 1.39 323.47 MWD+IFR-AK-CAZ-SC(2) 1,883.12 27.50 171.89 1,810.41 1,754.46 -370.25 74.93 5,957,121.60 378,107.20 1.59 365.62 MWD+IFR-AK-CAZ-SC(2) 1,978.37 27.85 171.71 1,894.76 1,838.81 -414.03 81.24 5,957,077.72 378,112.79 0.38 407.74 MWD+IFR-AK-CAZ-SC(2) 2,073.58 27.04 172.59 1,979.25 1,923.30 -457.50 87.24 5,957,034.16 378,118.09 0.95 449.44 MWD+IFR-AK-CAZ-SC(2) 2,168.65 26.64 173.82 2,064.08 2,008.13 -500.12 92.32 5,956,991.47 378,122.47 0.72 489.98 MWD+IFR-AK-CAZ-SC(2) 2,264.15 26.83 176.57 2,149.38 2,093.43 -542.92 95.91 5,956,948.62 378,125.37 1.31 530.02 MWD+IFR-AK-CAZ-SC(2) 2,359.30 28.34 175.78 2,233.71 2,177.76 -586.88 98.86 5,956,904.62 378,127.61 1.63 570.82 MWD+IFR-AK-CAZ-SC(2) 2,453.76 28.25 177.06 2,316.88 2,260.93 -631.57 101.66 5,956,859.90 378,129.68 0.65 612.21 MWD+IFR-AK-CAZ-SC(2) 2,548.71 28.92 174.56 2,400.26 2,344.31 -676.87 104.99 5,956,814.55 378,132.27 1.44 654.39 MWD+IFR-AK-CAZ-SC(2) 2,617.63 28.83 173.55 2,460.61 2,404.66 -709.97 108.43 5,956,781.40 378,135.18 0.72 685.65 MWD+IFR-AK-CAZ-SC(2) 2,629.82 28.82 173.37 2,471.29 2,415.34 -715.81 109.10 5,956,775.56 378,135.75 0.72 691.19 MWD+IFR-AK-CAZ-SC(3) ' 2,701.05 25.29 176.50 2,534.72 2,478.77 -748.06 112.01 5,956,743.26 378,138.14 5.34 721.45 MWD+IFR-AK-CAZ-SC(3) 2,753.57 26.66 178.85 2,581.94 2,525.99 -771.04 112.94 5,956,720.27 378,138.69 3.26 742.51 MWD+IFR-AK-CAZ-SC(3) 2,795.17 27.59 180.72 2,618.96 2,563.01 -790.00 113.00 5,956,701.31 378,138.45 3.03 759.59 MWD+IFR-AK-CAZ-SC(3) 2,889.57 28.14 185.00 2,702.43 2,646.48 -834.04 110.79 5,956,657.32 378,135.52 2.20 798.20 MWD+IFR-AK-CAZ-SC(3) 2,983.16 28.77 185.40 2,784.71 2,728.76 -878.45 106.74 5,956,612.98 378,130.76 0.70 836.34 MWD+IFR-AK-CAZ-SC(3) 3,073.03 31.65 185.53 2,862.36 2,806.41 -923.46 102.44 5,956,568.05 378,125.72 3.21 874.90 MWD+IFR-AK-CAZ-SC(3) 3,167.73 35.00 185.69 2,941.48 2,885.53 -975.23 97.35 5,956,516.38 378,119.79 3.54 919.20 MWD+IFR-AK-CAZ-SC(3) 3,261.51 37.81 188.02 3,016.96 2,961.01 -1,030.47 90.67 5,956,461.26 378,112.22 3.34 965.93 MWD+IFR-AK-CAZ-SC(3) 3,355.35 40.05 186.44 3,089.95 3,034.00 -1,088.96 83.27 5,956,402.90 378,103.87 2.61 1,015.25 MWD+IFR-AK-CAZ-SC(3) 3,449.50 42.49 184.31 3,160.71 3,104.76 -1,150.78 77.48 5,956,341.19 378,097.08 2.99 1,068.28 MWD+IFR-AK-CAZ-SC(3) 3,543.08 44.81 185.78 3,228.42 3,172.47 -1,215.12 71.78 5,956,276.96 378,090.34 2.71 1,123.61 MWD+IFR-AK-CAZ-SC(3) 3,637.48 46.80 186.43 3,294.23 3,238.28 -1,282.41 64.58 5,956,209.80 378,082.05 2.17 1,180.93 MWD+IFR-AK-CAZ-SC(3) 3,729.26 48.35 186.61 3,356.14 3,300.19 -1,349.72 56.88 5,956,142.63 378,073.26 1.70 1,238.05 MWD+IFR-AK-CAZ-SC(3) 3,825.49 50.22 185.96 3,418.91 3,362.96 -1,422.21 48.91 5,956,070.28 378,064.11 2.01 1,299.72 MWD+IFR-AK-CAZ-SC(3) 3,916.16 51.86 188.77 3,475.93 3,419.98 -1,492.12 39.85 5,956,000.53 378,053.92 3.01 1,358.58 MWD+IFR-AK-CAZ-SC(3) 4,008.80 53.25 186.76 3,532.25 3,476.30 -1,564.99 29.93 5,955,927.84 378,042.82 2.28 1,419.72 MWD+IFR-AK-CAZ-SC(3) 4,101.84 55.16 188.42 3,586.67 3,530.72 -1,639.78 19.95 5,955,853.22 378,031.63 2.51 1,482.57 MWD+IFR-AK-CAZ-SC(3) 4,192.41 56.68 192.12 3,637.43 3,581.48 -1,713.57 6.55 5,955,779.67 378,017.04 3.78 1,543.02 MWD+IFR-AK-CAZ-SC(3) 4,285.50 57.58 189.86 3,687.96 3,632.01 -1,790.31 -8.34 5,955,703.18 378,000.90 2.26 1,605.47 MWD+IFR-AK-CAZ-SC(3) 4,379.54 57.64 190.22 3,738.34 3,682.39 -1,868.51 -22.19 5,955,625.23 377,985.79 0.33 1,669.68 MWD+IFR-AK-CAZ-SC(3) 6127/2011 9:26:32AM Page 3 COMPASS 2003.16 Build 69 ConocoPhillips (Alaska) Inc. Definitive Survey Report Company: ConocoPhillips(Alaska)Inc. Local Co-ordinate Reference: Well CD4-208 Project: Western North Slope TVD Reference: CD4-208 @ 55.95ft Site: WNS Non-pad MD Reference: CD4-208 @ 55.95ft Well: CD4-208 North Reference: True Wellbore: CD4-208A Survey Calculation Method: Minimum Curvature Design: CD4-208A Database: CPAI EDM Production Survey Map Map Vertical MD Inc Azi TVD TVDSS +N/-S +E/-W Northing Easting DLS Section (ft) (°) (°) (ft) (ft) (ft) (ft) (ft) (ft) (°/100') (ft) Survey Tool Name 4,472.06 57.74 189.51 3,787.79 3,731.84 -1,945.55 -35.58 5,955,548.43 377,971.15 0.66 1,733.05 MWD+IFR-AK-CAZ-SC(3) 4,566.91 57.88 190.03 3,838.32 3,782.37 -2,024.65 -49.20 5,955,469.56 377,956.25 0.49 1,798.18 MWD+IFR-AK-CAZ-SC(3) 4,660.93 58.25 191.13 3,888.05 3,832.10 -2,103.08 -63.85 5,955,391.38 377,940.33 1.07 1,862.25 MWD+IFR-AK-CAZ-SC(3) 4,751.47 58.57 191.46 3,935.48 3,879.53 -2,178.71 -78.96 5,955,316.01 377,924.00 0.47 1,923.60 MWD+IFR-AK-CAZ-SC(3) 4,846.98 56.92 191.03 3,986.45 3,930.50 -2,257.93 -94.71 5,955,237.07 377,906.96 1.77 1,987.89 MWD+IFR-AK-CAZ-SC(3) 4,941.43 56.32 189.44 4,038.42 3,982.47 -2,335.54 -108.73 5,955,159.70 377,891.69 1.54 2,051.50 MWD+IFR-AK-CAZ-SC(3) 5,035.95 56.45 189.41 4,090.75 4,034.80 -2,413.19 -121.62 5,955,082.28 377,877.55 0.14 2,115.65 MWD+IFR-AK-CAZ-SC(3) 5,130.95 56.65 189.99 4,143.11 4,087.16 -2,491.32 -134.98 5,955,004.38 377,862.92 0.55 2,180.01 MWD+IFR-AK-CAZ-SC(3) 5,224.26 56.86 189.91 4,194.26 4,138.31 -2,568.19 -148.46 5,954,927.75 377,848.20 0.24 2,243.19 MWD+IFR-AK-CAZ-SC(3) 5,319.52 56.94 190.21 4,246.29 4,190.34 -2,646.76 -162.40 5,954,849.42 377,832.99 0.28 2,307.70 MWD+IFR-AK-CAZ-SC(3) 5,415.46 56.91 189.80 4,298.64 4,242.69 -2,725.93 -176.37 5,954,770.49 377,817.74 0.36 2,372.74 MWD+1FR-AK-CAZ-SC(3) 5,509.46 57.15 190.54 4,349.80 4,293.85 -2,803.55 -190.29 5,954,693.11 377,802.56 0.71 2,436.40 MWD+IFR-AK-CAZ-SC(3) 5,604.67 57.45 190.37 4,401.24 4,345.29 -2,882.34 -204.83 5,954,614.58 377,786.74 0.35 2,500.84 MWD+IFR-AK-CAZ-SC(3) 5,698.77 57.72 191.20 4,451.68 4,395.73 -2,960.38 -219.70 5,954,536.80 377,770.61 0.80 2,564.46 MWD+IFR-AK-CAZ-SC(3) 5,767.00 57.84 191.46 4,488.06 4,432.11 -3,016.97 -231.04 5,954,480.40 377,758.36 0.37 2,610.36 MWD+IFR-AK-CAZ-SC(4) 5,790.58 57.23 191.38 4,500.71 4,444.76 -3,036.47 -234.98 5,954,460.97 377,754.10 2.60 2,626.16 MWD+IFR-AK-CAZ-SC(4) 5,860.18 57.02 191.29 4,538.49 4,482.54 -3,093.79 -246.46 5,954,403.85 377,741.69 0.32 2,672.64 MWD+IFR-AK-CAZ-SC(4) 5,954.80 53.90 189.21 4,592.14 4,536.19 -3,170.46 -260.36 5,954,327.42 377,726.55 3.76 2,735.46 MWD+IFR-AK-CAZ-SC(4) 6,049.53 55.84 189.20 4,646.65 4,590.70 -3,246.94 -272.75 5,954,251.16 377,712.92 2.05 2,798.76 MWD+IFR-AK-CAZ-SC(4) 6,144.50 56.35 186.99 4,699.63 4,643.68 -3,324.97 -283.84 5,954,173.33 377,700.57 2.00 2,864.03 MWD+IFR-AK-CAZ-SC(4) 6,238.40 57.01 183.34 4,751.22 4,695.27 -3,403.09 -290.90 5,954,095.33 377,692.25 3.32 2,931.16 MWD+IFR-AK-CAZ-SC(4) 6,329.47 57.53 179.85 4,800.47 4,744.52 -3,479.65 -293.02 5,954,018.82 377,688.88 3.27 2,999.04 MWD+IFR-AK-CAZ-SC(4) 6,428.27 56.97 175.53 4,853.94 4,797.99 -3,562.65 -289.68 5,953,935.79 377,690.87 3.72 3,075.10 MWD+IFR-AK-CAZ-SC(4) 6,520.81 58.03 171.39 4,903.67 4,847.72 -3,640.16 -280.78 5,953,858.15 377,698.52 3.94 3,148.67 MWD+IFR-AK-CAZ-SC(4) 6,617.60 59.35 165.77 4,954.00 4,898.05 -3,721.16 -264.39 5,953,776.91 377,713.59 5.14 3,228.66 MWD+IFR-AK-CAZ-SC(4) 6,666.50 59.31 164.06 4,978.94 4,922.99 -3,761.77 -253.44 5,953,736.13 377,723.87 3.01 3,269.95 MWD+IFR-AK-CAZ-SC(4) 6,712.30 59.42 162.53 5,002.28 4,946.33 -3,799.51 -242.12 5,953,698.21 377,734.59 2.88 3,308.84 MWD+IFR-AK-CAZ-SC(4) 6,805.80 59.53 159.34 5,049.78 4,993.83 -3,875.62 -215.81 5,953,621.69 377,759.65 2.94 3,388.78 MWD+IFR-AK-CAZ-SC(4) 6,900.04 61.80 155.04 5,095.97 5,040.02 -3,951.31 -183.94 5,953,545.50 377,790.28 4.65 3,470.77 MWD+IFR-AK-CAZ-SC(4) 6,995.17 63.39 151.73 5,139.76 5,083.81 -4,026.78 -146.10 5,953,469.43 377,826.89 3.51 3,555.20 MWD+IFR-AK-CAZ-SC(4) 7,089.35 63.81 150.38 5,181.64 5,125.69 -4,100.60 -105.27 5,953,394.96 377,866.51 1.36 3,639.45 MWD+IFR-AK-CAZ-SC(4) 7,184.48 65.19 148.27 5,222.60 5,166.65 -4,174.44 -61.47 5,953,320.43 377,909.11 2.47 3,725.02 MWD+IFR-AK-CAZ-SC(4) 7,274.26 64.76 148.46 5,260.57 5,204.62 -4,243.70 -18.80 5,953,250.49 377,950.65 0.52 3,805.97 MWD+IFR-AK-CAZ-SC(4) 7,371.45 64.38 148.01 5,302.31 5,246.36 -4,318.33 27.41 5,953,175.13 377,995.64 0.57 3,893.30 MWD+IFR-AK-CAZ-SC(4) 7,466.38 64.00 147.85 5,343.64 5,287.69 -4,390.75 72.78 5,953,101.99 378,039.83 0.43 3,978.28 MWD+I FR-AK-CAZ-SC(4) 7,562.86 64.81 149.03 5,385.32 5,329.37 -4,464.89 118.32 5,953,027.13 378,084.15 1.39 4,064.88 MW D+I FR-AK-CAZ-SC(4) 7,654.77 64.63 148.70 5,424.57 5,368.62 -4,536.02 161.29 5,952,955.31 378,125.96 0.38 4,147.66 MWD+IFR-AK-CAZ-SC(4) 7,751.58 65.57 147.86 5,465.33 5,409.38 -4,610.72 207.46 5,952,879.89 378,170.91 1.25 4,235.03 MWD+IFR-AK-CAZ-SC(4) 7,846.11 65.36 148.19 5,504.58 5,448.63 -4,683.66 253.00 5,952,806.22 378,215.25 0.39 4,320.56 MWD+IFR-AK-CAZ-SC(4) 7,938.87 65.01 147.75 5,543.51 5,487.56 -4,755.04 297.65 5,952,734.13 378,258.74 0.57 4,404.29 MWD+IFR-AK-CAZ-SC(4) 6/27/2011 9:26:32AM Page 4 COMPASS 2003.16 Build 69 ConocoPhillips (Alaska) Inc. Definitive Survey Report Company: ConocoPhillips(Alaska)Inc. Local Co-ordinate Reference: Well CD4-208 Project: Western North Slope TVD Reference: CD4-208 @ 55.95ft Site: WNS Non-pad MD Reference: CD4-208 @ 55.95ft Well: CD4-208 North Reference: True Wellbore: CD4-208A Survey Calculation Method: Minimum Curvature Design: CD4-208A Database: CPAI EDM Production Survey Map Map Vertical MD Inc Azi TVD TVDSS +N/-S +E/-W Northing Easting DLS Section (ft) (°) (°) (ft) (ft) (ft) (ft) (ft) (ft) (°/100') (ft) Survey Tool Name 8,033.55 65.08 148.31 5,583.46 5,527.51 -4,827.86 343.10 5,952,660.59 378,303.00 0.54 4,489.66 MWD+IFR-AK-CAZ-SC(4) 8,129.86 65.44 148.95 5,623.77 5,567.82 -4,902.55 388.64 5,952,585.18 378,347.31 0.71 4,576.75 MWD+IFR-AK-CAZ-SC(4) 8,223.06 64.96 148.64 5,662.86 5,606.91 -4,974.91 432.47 5,952,512.12 378,389.96 0.60 4,661.00 MWD+IFR-AK-CAZ-SC(4) 8,319.86 65.22 149.21 5,703.63 5,647.68 -5,050.10 477.79 5,952,436.21 378,434.04 0.60 4,748.45 MWD+IFR-AK-CAZ-SC(4) 8,411.99 64.51 149.42 5,742.76 5,686.81 -5,121.83 520.35 5,952,363.80 378,475.44 0.80 4,831.58 MWD+IFR-AK-CAZ-SC(4) 8,507.83 64.86 150.43 5,783.74 5,727.79 -5,196.80 563.76 5,952,288.14 378,517.62 1.02 4,917.99 MWD+IFR-AK-CAZ-SC(4) 8,600.74 65.05 151.61 5,823.08 5,767.13 -5,270.44 604.55 5,952,213.86 378,557.20 1.17 5,002.05 MWD+IFR-AK-CAZ-SC(4) 8,697.23 65.78 150.52 5,863.22 5,807.27 -5,347.22 647.00 5,952,136.41 378,598.40 1.28 5,089.68 MWD+IFR-AK-CAZ-SC(4) 8,788.96 65.39 150.56 5,901.14 5,845.19 -5,419.95 688.08 5,952,063.03 378,638.29 0.43 5,173.05 MWD+IFR-AK-CAZ-SC(4) 8,885.86 65.52 148.22 5,941.40 5,885.45 -5,495.80 732.96 5,951,986.46 378,681.93 2.20 5,260.90 MWD+IFR-AK-CAZ-SC(4) 8,981.61 65.48 146.47 5,981.11 5,925.16 -5,569.16 779.97 5,951,912.36 378,727.74 1.66 5,347.44 MWD+IFR-AK-CAZ-SC(4) 9,075.98 64.76 146.45 6,020.81 5,964.86 -5,640.51 827.27 5,951,840.25 378,773.87 0.76 5,432.31 MWD+IFR-AK-CAZ-SC(4) 9,171.33 63.94 148.08 6,062.08 6,006.13 -5,712.81 873.75 5,951,767.22 378,819.17 1.76 5,517.67 MWD+IFR-AK-CAZ-SC(4) 9,265.80 64.87 149.30 6,102.90 6,046.95 -5,785.60 918.02 5,951,693.73 378,862.25 1.52 5,602.50 MWD+IFR-AK-CAZ-SC(4) 9,361.20 65.32 148.92 6,143.07 6,087.12 -5,859.86 962.44 5,951,618.77 378,905.46 0.59 5,688.71 MWD+IFR-AK-CAZ-SC(4) 9,455.82 65.25 149.67 6,182.63 6,126.68 -5,933.76 1,006.33 5,951,544.17 378,948.14 0.72 5,774.37 MWD+IFR-AK-CAZ-SC(4) 9,547.98 64.54 149.81 6,221.73 6,165.78 -6,005.84 1,048.39 5,951,471.42 378,989.02 0.78 5,857.60 MWD+IFR-AK-CAZ-SC(4) 9,641.11 65.04 149.38 6,261.40 6,205.45 -6,078.51 1,091.03 5,951,398.07 379,030.47 0.68 5,941.61 MWD+IFR-AK-CAZ-SC(4) 9,732.75 65.56 149.49 6,299.69 6,243.74 -6,150.20 1,133.37 5,951,325.71 379,071.64 0.58 6,024.60 MWD+IFR-AK-CAZ-SC(4) 9,832.03 65.35 148.88 6,340.94 6,284.99 -6,227.76 1,179.63 5,951,247.42 379,116.63 0.60 6,114.59 MWD+IFR-AK-CAZ-SC(4) 9,926.48 64.13 149.04 6,381.24 6,325.29 -6,300.94 1,223.67 5,951,173.54 379,159.48 1.30 6,199.67 MWD+IFR-AK-CAZ-SC(4) 10,017.23 65.21 153.04 6,420.08 6,364.13 -6,372.70 1,263.37 5,951,101.15 379,198.00 4.16 6,281.57 MWD+IFR-AK-CAZ-SC(4) 10,111.50 63.78 155.60 6,460.67 6,404.72 -6,449.36 1,300.24 5,951,023.91 379,233.63 2.88 6,366.64 MWD+IFR-AK-CAZ-SC(4) 10,206.53 62.34 158.79 6,503.74 6,447.79 -6,527.43 1,333.09 5,950,945.32 379,265.19 3.35 6,451.20 MWD+IFR-AK-CAZ-SC(4) 10,301.04 62.69 161.65 6,547.36 6,491.41 -6,606.32 1,361.45 5,950,865.99 379,292.27 2.71 6,534.54 MWD+IFR-AK-CAZ-SC(4) 10,395.70 62.56 165.92 6,590.90 6,534.95 -6,687.01 1,384.92 5,950,784.94 379,314.43 4.01 6,617.35 MWD+IFR-AK-CAZ-SC(4) 10,490.20 65.09 168.03 6,632.59 6,576.64 -6,769.62 1,404.01 5,950,702.03 379,332.18 3.34 6,699.98 MWD+IFR-AK-CAZ-SC(4) 10,585.59 64.42 172.64 6,673.29 6,617.34 -6,854.65 1,418.50 5,950,616.79 379,345.28 4.43 6,782.75 MWD+IFR-AK-CAZ-SC(4) 10,680.83 63.67 176.43 6,714.98 6,659.03 -6,939.87 1,426.67 5,950,531.45 379,352.06 3.66 6,862.92 MWD+IFR-AK-CAZ-SC(4) 10,773.29 63.30 181.33 6,756.28 6,700.33 -7,022.55 1,428.29 5,950,448.76 379,352.34 4.76 6,937.95 MWD+IFR-AK-CAZ-SC(4) 10,871.19 64.24 186.35 6,799.57 6,743.62 -7,110.13 1,422.39 5,950,361.30 379,345.03 4.70 7,014.08 MWD+IFR-AK-CAZ-SC(4) 10,965.88 63.80 192.25 6,841.08 6,785.13 -7,194.08 1,408.65 5,950,277.58 379,329.93 5.62 7,083.51 MWD+IFR-AK-CAZ-SC(4) 11,060.27 64.10 194.40 6,882.54 6,826.59 -7,276.60 1,389.11 5,950,195.41 379,309.05 2.07 7,149.11 MWD+IFR-AK-CAZ-SC(4) 11,154.53 64.17 196.05 6,923.66 6,867.71 -7,358.43 1,366.84 5,950,113.95 379,285.46 1.58 7,212.90 MWD+IFR-AK-CAZ-SC(4) 11,249.60 63.60 198.05 6,965.51 6,909.56 -7,440.04 1,341.81 5,950,032.77 379,259.11 1.98 7,275.27 MWD+IFR-AK-CAZ-SC(4) 11,344.15 63.38 199.48 7,007.72 6,951.77 -7,520.15 1,314.60 5,949,953.12 379,230.60 1.37 7,335.35 MWD+IFR-AK-CAZ-SC(4) 11,438.78 63.98 199.31 7,049.67 6,993.72 -7,600.15 1,286.43 5,949,873.59 379,201.15 0.65 7,394.91 MWD+IFR-AK-CAZ-SC(4) 11,532.97 65.08 200.85 7,090.18 7,034.23 -7,680.01 1,257.23 5,949,794.22 379,170.66 1.88 7,453.89 MWD+IFR-AK-CAZ-SC(4) 11,627.85 66.00 199.82 7,129.47 7,073.52 -7,761.00 1,227.22 5,949,713.74 379,139.34 1.38 7,513.52 MWD+IFR-AK-CAZ-SC(4) 11,719.73 65.39 199.08 7,167.28 7,111.33 -7,839.95 1,199.34 5,949,635.25 379,110.18 0.99 7,572.26 MWD+IFR-AK-CAZ-SC(4) 6/'27(2011 9:26:32AM Page 5 COMPASS 2003.16 Build 69 ConocoPhillips (Alaska) Inc. Definitive Survey Report Company: ConocoPhillips(Alaska)Inc. Local Co-ordinate Reference: Well CD4-208 Project: Western North Slope TVD Reference: CD4-208 @ 55.95ft Site: WNS Non-pad MD Reference: CD4-208 @ 55.95ft Well: CD4-208 North Reference: True Wellbore: CD4-208A Survey Calculation Method: Minimum Curvature Design: CD4-208A Database: CPAI EDM Production Survey Map Map Vertical MD Inc Azi TVD TVDSS +Nl-S +El-W Northing Easting DLS Section (ft) (°) (°) (ft) (ft) (ft) (ft) (ft) (ft) (°l100') (ft) Survey Tool Name 11,812.09 63.61 201.20 7,207.05 7,151.10 -7,918.21 1,170.65 5,949,557.47 379,080.23 2.83 7,630.02 MWD+IFR-AK-CAZ-SC(4) 11,903.36 64.02 200.55 7,247.32 7,191.37 -7,994.74 1,141.47 5,949,481.44 379,049.81 0.78 7,686.01 MWD+IFR-AK-CAZ-SC(4) 12,001.03 64.76 200.74 7,289.54 7,233.59 -8,077.16 1,110.41 5,949,399.54 379,017.43 0.78 7,746.47 MWD+IFR-AK-CAZ-SC(4) 12,100.50 64.78 200.63 7,331.94 7,275.99 -8,161.34 1,078.63 5,949,315.89 378,984.29 0.10 7,808.20 MWD+IFR-AK-CAZ-SC(4) 12,195.51 65.80 198.63 7,371.66 7,315.71 -8,242.63 1,049.64 5,949,235.09 378,953.99 2.19 7,868.56 MWD+IFR-AK-CAZ-SC(4) 12,223.38 67.42 199.03 7,382.72 7,326.77 -8,266.84 1,041.38 5,949,211.02 378,945.34 5.96 7,886.70 MWD+IFR-AK-CAZ-SC(4) 12,286.72 71.66 200.23 7,404.86 7,348.91 -8,322.71 1,021.45 5,949,155.48 378,924.50 6.93 7,928.18 MWD+IFR-AK-CAZ-SC(4) 12,351.00 74.37 199.15 7,423.64 7,367.69 -8,380.59 1,000.74 5,949,097.95 378,902.85 4.51 7,971.12 MWD+IFR-AK-CAZ-SC(4) 12,397.83 77.18 198.48 7,435.14 7,379.19 -8,423.56 986.10 5,949,055.23 378,887.52 6.16 8,003.32 MWD+IFR-AK-CAZ-SC(4) 12,446.04 78.82 197.78 7,445.17 7,389.22 -8,468.37 971.43 5,949,010.67 378,872.13 3.69 8,037.17 MWD+IFR-AK-CAZ-SC(4) 12,491.01 81.32 198.49 7,452.92 7,396.97 -8,510.46 957.64 5,948,968.81 378,857.66 5.77 8,068.95 MWD+IFR-AK-CAZ-SC(4) 12,541.08 84.05 196.78 7,459.29 7,403.34 -8,557.78 942.60 5,948,921.74 378,841.85 6.42 8,104.89 MWD+IFR-AK-CAZ-SC(4) 12,589.28 86.78 197.68 7,463.15 7,407.20 -8,603.67 928.37 5,948,876.09 378,826.88 5.96 8,139.90 MWD+IFR-AK-CAZ-SC(4) 12,636.96 89.31 197.43 7,464.77 7,408.82 -8,649.10 914.00 5,948,830.91 378,811.78 5.33 8,174.43 MWD+IFR-AK-CAZ-SC(4) 12,681.00 91.73 196.58 7,464.37 7,408.42 -8,691.21 901.12 5,948,789.02 378,798.22 5.82 8,206.63 MWD+IFR-AK-CAZ-SC(4) 12,731.47 93.64 195.42 7,462.01 7,406.06 -8,739.67 887.22 5,948,740.79 378,783.54 4.43 8,244.09 MWD+IFR-AK-CAZ-SC(4) 12,779.24 94.63 196.05 7,458.57 7,402.62 -8,785.53 874.30 5,948,695.15 378,769.88 2.45 8,279.65 MWD+IFR-AK-CAZ-SC(4) 12,826.93 95.20 195.36 7,454.48 7,398.53 -8,831.27 861.44 5,948,649.63 378,756.28 1.87 8,315.12 MWD+IFR-AK-CAZ-SC(4) 12,922.64 94.51 194.06 7,446.38 7,390.43 -8,923.50 837.23 5,948,557.81 378,730.57 1.53 8,387.41 MWD+IFR-AK-CAZ-SC(4) 13,016.79 92.65 193.87 7,440.50 7,384.55 -9,014.69 814.55 5,948,467.01 378,706.42 1.99 8,459.42 MWD+IFR-AK-CAZ-SC(4) 13,113.42 92.78 195.64 7,435.92 7,379.97 -9,108.02 789.97 5,948,374.09 378,680.33 1.83 8,532.54 MWD+IFR-AK-CAZ-SC(4) 13,207.06 92.22 196.05 7,431.84 7,375.89 -9,198.02 764.43 5,948,284.53 378,653.33 0.74 8,602.23 MWD+IFR-AK-CAZ-SC(4) 13,303.21 92.71 196.21 7,427.70 7,371.75 -9,290.30 737.74 5,948,192.70 378,625.15 0.54 8,673.47 MWD+IFR-AK-CAZ-SC(4) 13,398.54 93.02 196.00 7,422.94 7,366.99 -9,381.77 711.33 5,948,101.68 378,597.27 0.39 8,744.11 MWD+IFR-AK-CAZ-SC(4) 13,493.92 92.71 192.90 7,418.17 7,362.22 -9,474.01 687.56 5,948,009.85 378,572.01 3.26 8,816.59 MWD+IFR-AK-CAZ-SC(4) 13,589.26 92.41 189.68 7,413.91 7,357.96 -9,567.40 668.92 5,947,916.78 378,551.85 3.39 8,892.35 MWD+IFR-AK-CAZ-SC(4) 13,684.59 91.79 186.06 7,410.42 7,354.47 -9,661.75 655.88 5,947,822.66 378,537.28 3.85 8,971.44 MWD+IFR-AK-CAZ-SC(4) 13,729.62 90.00 182.25 7,409.71 7,353.76 -9,706.65 652.61 5,947,777.83 378,533.29 9.35 9,010.36 MWD+IFR-AK-CAZ-SC(4) 13,778.99 91.05 179.93 7,409.26 7,353.31 -9,756.00 651.68 5,947,728.50 378,531.55 5.16 9,054.31 MWD+IFR-AK-CAZ-SC(4) 13,828.18 91.54 178.08 7,408.15 7,352.20 -9,805.17 652.53 5,947,679.33 378,531.61 3.89 9,098.88 MWD+IFR-AK-CAZ-SC(4) 13,874.68 92.03 176.14 7,406.70 7,350.75 -9,851.59 654.87 5,947,632.88 378,533.20 4.30 9,141.62 MWD+IFR-AK-CAZ-SC(4) 13,970.11 88.89 171.14 7,405.93 7,349.98 -9,946.38 665.44 5,947,537.93 378,542.23 6.19 9,231.46 MWD+IFR-AK-CAZ-SC(4) 14,016.10 88.21 168.19 7,407.10 7,351.15 -9,991.61 673.69 5,947,492.59 378,549.74 6.58 9,275.72 MWD+IFR-AK-CAZ-SC(4) 14,065.94 88.64 165.94 7,408.47 7,352.52 -10,040.16 684.84 5,947,443.86 378,560.10 4.59 9,324.25 MWD+IFR-AK-CAZ-SC(4) 14,161.01 88.39 163.26 7,410.93 7,354.98 -10,131.78 710.07 5,947,351.85 378,583.84 2.83 9,417.66 MWD+IFR-AK-CAZ-SC(4) 14,207.10 88.45 163.81 7,412.20 7,356.25 -10,175.96 723.13 5,947,307.47 378,596.18 1.20 9,463.09 MWD+IFR-AK-CAZ-SC(4) 14,257.74 90.24 163.67 7,412.78 7,356.83 -10,224.57 737.31 5,947,258.64 378,609.57 3.55 9,513.00 MWD+IFR-AK-CAZ-SC(4) 14,353.46 90.31 160.21 7,412.32 7,356.37 -10,315.56 766.98 5,947,167.19 378,637.76 3.62 9,607.79 MWD+IFR-AK-CAZ-SC(4) 14,402.36 87.84 157.61 7,413.11 7,357.16 -10,361.17 784.57 5,947,121.30 378,654.60 7.33 9,656.49 MWD+IFR-AK-CAZ-SC(4) 14,448.92 89.32 155.48 7,414.26 7,358.31 -10,403.87 803.09 5,947,078.32 378,672.43 5.57 9,702.99 MWD+IFR-AK-CAZ-SC(4) 6/27/2011 9:26:32AM Page 6 COMPASS 2003.16 Build 69 ConocoPhillips (Alaska) Inc. Definitive Survey Report Company: ConocoPhillips(Alaska)Inc. Local Co-ordinate Reference: Well CD4-208 Project: Western North Slope TVD Reference: CD4-208 @ 55.95ft Site: WNS Non-pad MD Reference: CD4-208 @ 55.95ft Well: CD4-208 North Reference: True Wellbore: CD4-208A Survey Calculation Method: Minimum Curvature Design: CD4-208A Database: CPAI EDM Production Survey Map Map Vertical MD Inc Azi TVD TVDSS +NI-S +E/-W Northing Easting DLS Section (ft) (°) (0) (ft) (ft) (ft) (ft) (ft) (ft) (°I100') (ft) Survey Tool Name 14,497.22 89.87 153.87 7,414.61 7,358.66 -10,447.52 823.75 5,947,034.33 378,692.38 3.52 9,751.28 MWD+IFR-AK-CAZ-SC(4) 14,544.51 89.20 152.88 7,414.99 7,359.04 -10,489.80 844.95 5,946,991.73 378,712.88 2.53 9,798.57 MWD+IFR-AK-CAZ-SC(4) 14,639.09 88.82 151.43 7,416.62 7,360.67 -10,573.41 889.11 5,946,907.41 378,755.68 1.58 9,893.08 MWD+IFR-AK-CAZ-SC(4) 14,735.43 88.95 151.06 7,418.50 7,362.55 -10,657.85 935.45 5,946,822.24 378,800.64 0.41 9,989.29 MWD+IFR-AK-CAZ-SC(4) 14,830.10 88.14 149.30 7,420.90 7,364.95 -10,739.96 982.51 5,946,739.39 378,846.36 2.05 10,083.71 MWD+IFR-AK-CAZ-SC(4) 14,926.72 89.25 151.78 7,423.10 7,367.15 -10,824.06 1,030.01 5,946,654.54 378,892.48 2.81 10,180.12 MWD+IFR-A1K-CAZ-SC(4) 15,021.38 89.69 155.79 7,423.98 7,368.03 -10,908.96 1,071.82 5,946,568.97 378,932.90 4.26 10,274.76 MWD+IFR-AK-CAZ-SC(4) 15,071.14 88.64 156.66 7,424.70 7,368.75 -10,954.49 1,091.88 5,946,523.13 378,952.22 2.74 10,324.48 MWD+IFR-AK-CAZ-SC(4) 15,117.70 88.14 155.82 7,426.01 7,370.06 -10,997.09 1,110.63 5,946,480.24 378,970.27 2.10 10,370.98 MWD+IFR-AK-CAZ-SC(4) 15,212.21 89.19 155.80 7,428.21 7,372.26 -11,083.27 1,149.34 5,946,393.44 379,007.58 1.11 10,465.42 MWD+1FR-AK-CAZ-SC(4) 15,308.51 88.95 154.29 7,429.78 7,373.83 -11,170.57 1,189.97 5,946,305.50 379,046.78 1.59 10,561.69 MW D+I FR-AK-CAZ-SC(4) 15,403.81 88.76 152.23 7,431.68 7,375.73 -11,255.65 1,232.83 5,946,219.74 379,088.26 2.17 10,656.95 MWD+I FR-AK-CAZ-SC(4) 15,499.74 88.64 153.26 7,433.86 7,377.91 -11,340.91 1,276.75 5,946,133.79 379,130.79 1.08 10,752.84 MWD+IFR-AK-CAZ-SC(4) 15,595.21 88.64 153.09 7,436.12 7,380.17 -11,426.08 1,319.82 5,946,047.94 379,172.47 0.18 10,848.27 MWD+IFR-AK-CAZ-SC(4) 15,688.36 89.32 153.00 7,437.78 7,381.83 -11,509.10 1,362.04 5,945,964.25 379,213.33 0.74 10,941.39 MWD+IFR-AK-CAZ-SC(4) 15,785.39 89.69 153.52 7,438.62 7,382.67 -11,595.75 1,405.70 5,945,876.91 379,255.57 0.66 11,038.41 MWD+IFR-AK-CAZ-SC(4) 15,878.83 89.44 153.00 7,439.33 7,383.38 -11,679.19 1,447.74 5,945,792.80 379,296.25 0.62 11,131.84 MWD+IFR-AK-CAZ-SC(4) 15,929.53 88.64 152.23 7,440.18 7,384.23 -11,724.21 1,471.05 5,945,747.42 379,318.83 2.19 11,182.51 MWD+IFR-AK-CAZ-SC(4) 15,974.52 87.03 151.02 7,441.88 7,385.93 -11,763.76 1,492.42 5,945,707.53 379,339.55 4.48 11,227.43 MWD+IFR-AK-CAZ-SC(4) 16,071.36 87.71 149.86 7,446.32 7,390.37 -11,847.90 1,540.14 5,945,622.63 379,385.89 1.39 11,323.98 MWD+IFR-AK-CAZ-SC(4) 16,165.71 87.90 148.63 7,449.94 7,393.99 -11,928.92 1,588.35 5,945,540.85 379,432.78 1.32 11,417.93 MWD+IFR-AK-CAZ-SC(4) 16,262.48 89.56 150.03 7,452.08 7,396.13 -12,012.13 1,637.70 5,945,456.86 379,480.77 2.24 11,514.35 MWD+IFR-AK-CAZ-SC(4) 16,357.97 89.81 151.45 7,452.61 7,396.66 -12,095.44 1,684.37 5,945,372.81 379,526.08 1.51 11,609.69 MWD+IFR-AK-CAZ-SC(4) 16,453.28 90.24 150.82 7,452.57 7,396.62 -12,178.90 1,730.38 5,945,288.62 379,570.72 0.80 11,704.88 MWD+IFR-AK-CAZ-SC(4) 16,549.03 89.56 149.32 7,452.73 7,396.78 -12,261.88 1,778.15 5,945,204.88 379,617.14 1.72 11,800.40 MWD+IFR-AK-CAZ-SC(4) 16,644.80 89.87 146.69 7,453.21 7,397.26 -12,343.10 1,828.89 5,945,122.86 379,666.55 2.77 11,895.63 MWD+IFR-AK-CAZ-SC(4) 16,740.30 89.87 146.87 7,453.43 7,397.48 -12,422.99 1,881.21 5,945,042.14 379,717.56 0.19 11,990.38 MWD+IFR-AK-CAZ-SC(4) 16,836.12 89.26 149.05 7,454.15 7,398.20 -12,504.20 1,932.04 5,944,960.11 379,767.06 2.36 12,085.66 MWD+IFR-AK-CAZ-SC(4) 16,930.98 89.26 150.92 7,455.38 7,399.43 -12,586.33 1,979.49 5,944,877.23 379,813.16 1.97 12,180.27 MWD+IFR-AK-CAZ-SC(4) 17,026.20 88.95 152.40 7,456.87 7,400.92 -12,670.13 2,024.68 5,944,792.72 379,856.99 1.59 12,275.40 MWD+IFR-AK-CAZ-SC(4) 17,121.64 88.95 152.76 7,458.61 7,402.66 -12,754.83 2,068.62 5,944,707.33 379,899.55 0.38 12,370.79 MWD+IFR-AK-CAZ-SC(4) 17,217.34 89.93 152.77 7,459.55 7,403.60 -12,839.92 2,112.42 5,944,621.55 379,941.95 1.02 12,466.46 MWD+IFR-AK-CAZ-SC(4) 17,312.72 89.32 151.64 7,460.17 7,404.22 -12,924.29 2,156.89 5,944,536.47 379,985.05 1.35 12,561.79 MWD+IFR-AK-CAZ-SC(4) 17,408.35 89.25 151.71 7,461.37 7,405.42 -13,008.46 2,202.26 5,944,451.58 380,029.04 0.10 12,657.34 MWD+IFR-AK-CAZ-SC(4) 17,503.28 89.50 153.26 7,462.40 7,406.45 -13,092.65 2,246.11 5,944,366.70 380,071.52 1.65 12,752.22 MWD+IFR-AK-CAZ-SC(4) 17,598.86 89.75 152.95 7,463.03 7,407.08 -13,177.89 2,289.35 5,944,280.78 380,113.36 0.42 12,847.79 MWD+IFR-AK-CAZ-SC(4) 17,694.00 89.38 153.20 7,463.75 7,407.80 -13,262.71 2,332.43 5,944,195.28 380,155.06 0.47 12,942.92 MWD+IFR-AK-CAZ-SC(4) 17,789.72 89.38 153.39 7,464.79 7,408.84 -13,348.22 2,375.44 5,944,109.09 380,196.68 0.20 13,038.62 MWD+IFR-AK-CAZ-SC(4) 17,884.92 89.38 152.68 7,465.82 7,409.87 -13,433.06 2,418.61 5,944,023.57 380,238.46 0.75 13,133.80 MWD+IFR-AK-CAZ-SC(4) 17,980.34 89.75 152.37 7,466.54 7,410.59 -13,517.71 2,462.63 5,943,938.21 380,281.10 0.51 13,229.19 MWD+IFR-AK-CAZ-SC(4) 6/27/2011 9:26:32AM Page 7 COMPASS 2003.16 Build 69 ConocoPhillips (Alaska) Inc. Definitive Survey Report Company: ConocoPhillips(Alaska)Inc. Local Co-ordinate Reference: Well CD4-208 Project: Western North Slope TVD Reference: CD4-208©55.95ft Site: WNS Non-pad MD Reference: CD4-208 @ 55.95ft Well: CD4-208 North Reference: True Wellbore: CD4-208A Survey Calculation Method: Minimum Curvature Design: CD4-208A Database: CPAI EDM Production Survey Map Map Vertical MD Inc Azi TVD TVDSS +N/-S +E/-W Northing Easting DLS Section (ft) (0) (°) (ft) (ft) (ft) (ft) (ft) (ft) (01100*) (ft) Survey Tool Name 18,075.06 89.87 154.83 7,466.86 7,410.91 -13,602.55 2,504.74 5,943,852.71 380,321.82 2.60 13,323.90 MWD+IFR-AK-CAZ-SC(4) 18,169.31 88.88 156.05 7,467.88 7,411.93 -13,688.26 2,543.91 5,943,766.38 380,359.59 1.67 13,418.11 MWD+IFR-AK-CAZ-SC(4) 18,266.00 90.12 156.63 7,468.73 7,412.78 -13,776.82 2,582.71 5,943,677.21 380,396.95 1.42 13,514.71 MWD+IFR-AK-CAZ-SC(4) 18,361.53 90.49 155.14 7,468.22 7,41227 -13,864.01 2,621.74 5,943,589.41 380,434.56 1.61 13,610.19 MWD+IFR-AK-CAZ-SC(4) 18,457.82 89.13 155.05 7,468.54 7,412.59 -13,951.34 2,662.29 5,943,501.44 380,473.68 1.42 13,706.46 MWD+IFR-AK-CAZ-SC(4) 18,553.41 89.01 154.20 7,470.09 7,414.14 -14,037.70 2,703.25 5,943,414.44 380,513.23 0.90 13,802.03 MWD+IFR-AK-CAZ-SC(4) 18,648.56 88.76 153.34 7,471.94 7,415.99 -14,123.03 2,745.30 5,943,328.44 380,553.88 0.94 13,897.16 MWD+IFR-AK-CAZ-SC(4) 18,743.06 88.70 152.68 7,474.04 7,418.09 -14,207.22 2,788.17 5,943,243.57 380,595.38 0.70 13,991.62 MWD+IFR-AK-CAZ-SC(4) 18,839.46 86.91 153.88 7,477.73 7,421.78 -14,293.26 2,831.48 5,943,156.85 380,637.29 2.23 14,087.94 MWD+IFR-AK-CAZ-SC(4) 18,934.46 87.03 153.35 7,482.75 7,426.80 -14,378.24 2,873.64 5,943,071.20 380,678.06 0.57 14,182.80 MWD+IFR-AK-CAZ-SC(4) 19,030.44 90.55 153.75 7,484.78 7,428.83 -14,464.14 2,916.38 5,942,984.63 380,719.39 3.69 14,278.74 MWD+IFR-AK-CAZ-SC(4) 19,125.24 95.06 153.59 7,480.14 7,424.19 -14,548.98 2,958.36 5,942,899.12 380,759.99 4.76 14,373.40 MWD+IFR-AK-CAZ-SC(4) 19,221.14 95.94 151.46 7,470.95 7,415.00 -14,633.67 3,002.40 5,942,813.74 380,802.64 2.39 14,468.82 MWD+IFR-AK-CAZ-SC(4) 19,289.00 95.94 151.46 7,463.92 7,407.97 -14,692.97 3,034.65 5,942,753.94 380,833.92 0.00 14,536.25 PROJECTED to TD 6127/2011 9:26:32AM Page 8 COMPASS 2003.16 Build 69 1 i fvk4 l .. d f N r ConocoPhillips(Alaska) Inc. S 11 Western North Slope s' WNS Non-pad k CD4-208APB1 / 501032051771 0 ii a F 0 t, f Sperry Drilling Definitive Survey Report A 27 June, 2011 f fi 4 0,1 a it1Ma a A HALLIBURTON Sperry Drilling w w I ConocoPhillips (Alaska) Inc. Definitive Survey Report Company: ConocoPhillips(Alaska)Inc. Local Co-ordinate Reference: Well CD4-208 Project: Western North Slope TVD Reference: Rig:CD4-208 @ 56.13ft(Doyon 19(19.8+36.33) Site: WNS Non-pad MD Reference: Rig:CD4-208 @ 56.13ft(Doyon 19(19.8+36.33) Well: CD4-208 North Reference: True Wellbore: CD4-208APB1 Survey Calculation Method: Minimum Curvature Design: CD4-208APB1 Database: CPAI EDM Production Project Western North Slope Map System: US State Plane 1927(Exact solution) System Datum: Mean Sea Level Geo Datum: NAD 1927(NADCON CONUS) Using Well Reference Point Map Zone: Alaska Zone 04 Using geodetic scale factor Well CD4-208,Alpine CD4 Well Position +N/-S 0.00 ft Northing: 5,957,492.98 ft Latitude: 70° 17'32.618 N +E/-W 0.00 ft Fasting: 378,038.29ft Longitude: 150°59'14.723 W Position Uncertainty 0.00 ft Wellhead Elevation: ft Ground Level: 19.80ft Wellbore CD4-208APB1 Magnetics Model Name Sample Date Declination Dip Angle Field Strength (°) (°) (nT) BGGM2011 3/10/2011 20.62 80.74 57,601 Design CD4-208APB1 Audit Notes: Version: 1.0 Phase: ACTUAL Tie On Depth: 2,617.81 Vertical Section: Depth From(TVD) +N/-S +E/-W Direction (ft) (ft) (ft) (°) 36.33 0.00 0.00 154.00 Survey Program Date From To (ft) (ft) Survey(Wellbore) Tool Name Description Survey Date 80.18 438.28 CD4-208P61 Gyro(CD4-208P61) CB-GYRO-SS Camera based gyro single shot 12/12/2005 12 476.31 2,617.81 CD4-208PB1 IIFR(CD4-208PB1) MWD+IFR-AK-CAZ-SC MWD+IFR AK CAZ SCC 12/12/2005 12. 2,630.00 11,665.63 CD4-208APB1 MWD(R100)(CD4-208A MWD+IFR-AK-CAZ-SC MWD+IFR AK CAZ SCC 5/17/2011 12:C Survey Map Map Vertical MD Inc Azi TVD TVDSS +N/-S +El-W Northing Easting DLS Section (ft) (°) (°) (ft) (ft) (ft) (ft) (ft) (ft) (%100') (ft) Survey Tool Name 36.33 0.00 0.00 36.33 -19.80 0.00 0.00 5,957,492.98 378,038.29 0.00 0.00 UNDEFINED 80.18 0.30 323.00 80.18 24.05 0.09 -0.07 5,957,493.07 378,038.22 0.68 -0.11 CB-GYRO-SS(1) 169.18 0.40 334.00 169.18 113.05 0.56 -0.35 5,957,493.54 378,037.95 0.13 -0.65 CB-GYRO-SS(1) 259.18 0.75 331.00 259.17 203.04 1.35 -0.77 5,957,494.34 378,037.54 0.39 -1.55 CB-GYRO-SS(1) 349.18 0.30 325.00 349.17 293.04 2.06 -1.19 5,957,495.06 378,037.13 0.50 -2.38 CB-GYRO-SS(1) 438.18 0.15 252.00 438.17 382.04 2.22 -1.43 5,957,495.22 378,036.89 0.33 -2.62 CB-GYRO-SS(1) 476.31 0.25 256.78 476.30 420.17 2.18 -1.56 5,957,495.18 378,036.76 0.27 -2.65 MWD+IFR-AK-CAZ-SC(2) 566.96 1.47 155.15 566.94 510.81 1.08 -1.27 5,957,494.08 378,037.04 1.70 -1.53 MWD+IFR-AK-CAZ-SC(2) 656.46 2.54 151.45 656.38 600.25 -1.70 0.16 5,957,491.27 378,038.42 1.20 1.60 MWD+IFR-AK-CAZ-SC(2) 745.08 4.26 149.40 744.84 688.71 -6.26 2.78 5,957,486.67 378,040.96 1.95 6.84 MWD+IFR-AK-CAZ-SC(2) 835.54 5.81 151.84 834.95 778.82 -13.19 6.65 5,957,479.68 378,044.72 1.73 14.77 MWD+IFR-AK-CAZ-SC(2) 931.43 9.59 154.91 929.96 873.83 -24.71 12.33 5,957,468.08 378,050.21 3.96 27.61 MWD+IFR-AK-CAZ-SC(2) 6/27/2011 9:28:21AM Page 2 COMPASS 2003.16 Build 69 ConocoPhillips (Alaska) Inc. Definitive Survey Report Company: ConocoPhillips(Alaska)Inc. Local Co-ordinate Reference: Well CD4-208 Project: Western North Slope TVD Reference: Rig:CD4-208 @ 56.13ft(Doyon 19(19.8+36.33) Site: WNS Non-pad MD Reference: Rig:CD4-208 @ 56.13ft(Doyon 19(19.8+36.33) Well: CD4-208 North Reference: True Wellbore: CD4-208APB1 Survey Calculation Method: Minimum Curvature Design: CD4-208APB1 Database: CPAI EDM Production Survey Map Map Vertical MD Inc Azi TVD TVDSS +N/-S +E/-W Northing Easting DLS Section (ft) (°) (°) (ft) (ft) (ft) (ft) (ft) (ft) (°/100') (ft) Survey Tool Name 1,026.63 13.41 162.98 1,023.24 967.11 42.45 18.93 5,957,450.23 378,056.52 4.34 46.45 MWD+IFR-AK-CAZ-SC(2) 1,121.94 17.10 170.42 1,115.18 1,059.05 -66.85 24.50 5,957,425.75 378,061.69 4.38 70.82 MWD+IFR-AK-CAZ-SC(2) 1,217.37 20.64 173.35 1,205.47 1,149.34 -97.40 28.78 5,957,395.13 378,065.48 3.84 100.16 MWD+IFR-AK-CAZ-SC(2) 1,312.38 21.20 173.36 1,294.22 1,238.09 -131.09 32.71 5,957,361.38 378,068.86 0.59 132.16 MWD+IFR-AK-CAZ-SC(2) 1,408.01 23.61 170.23 1,382.63 1,326.50 -167.15 37.96 5,957,325.25 378,073.52 2.81 166.87 MWD+IFR-AK-CAZ-SC(2) 1,502.18 24.68 170.86 1,468.56 1,412.43 -205.14 44.28 5,957,287.16 378,079.23 1.17 203.79 MWD+IFR-AK-CAZ-SC(2) 1,597.41 24.85 170.91 1,555.03 1,498.90 -244.53 50.60 5,957,247.68 378,084.91 0.18 241.97 MWD+IFR-AK-CAZ-SC(2) 1,692.92 26.28 167.13 1,641.19 1,585.06 -284.97 58.48 5,957,207.12 378,092.13 2.27 281.76 MWD+IFR-AK-CAZ-SC(2) 1,788.06 27.42 168.61 1,726.07 1,669.94 -326.98 67.50 5,957,164.98 378,100.47 1.39 323.47 MWD+IFR-AK-CAZ-SC(2) 1,883.30 27.50 171.89 1,810.59 1,754.46 -370.25 74.93 5,957,121.60 378,107.20 1.59 365.62 MWD+IFR-AK-CAZ-SC(2) 1,978.55 27.85 171.71 1,894.94 1,838.81 -414.03 81.24 5,957,077.72 378,112.79 0.38 407.74 MWD+IFR-AK-CAZ-SC(2) 2,073.76 27.04 172.59 1,979.43 1,923.30 -457.50 87.24 5,957,034.16 378,118.09 0.95 449.44 MWD+IFR-AK-CAZ-SC(2) 2,168.83 26.64 173.82 2,064.26 2,008.13 -500.12 92.32 5,956,991.47 378,122.47 0.72 489.98 MWD+IFR-AK-CAZ-SC(2) 2,264.33 26.83 176.57 2,149.56 2,093.43 -542.92 95.91 5,956,948.62 378,125.37 1.31 530.02 MWD+IFR-AK-CAZ-SC(2) 2,359.48 28.34 175.78 2,233.89 2,177.76 -586.88 98.86 5,956,904.62 378,127.61 1.63 570.82 MWD+IFR-AK-CAZ-SC(2) 2,453.94 28.25 177.06 2,317.06 2,260.93 -631.57 101.66 5,956,859.90 378,129.68 0.65 612.21 MWD+IFR-AK-CAZ-SC(2) 2,548.89 28.92 174.56 2,400.44 2,344.31 -676.87 104.99 5,956,814.55 378,132.27 1.44 654.39 MWD+IFR-AK-CAZ-SC(2) 2,617.81 28.83 173.55 2,460.79 2,404.66 -709.97 108.43 5,956,781.40 378,135.18 0.72 685.65 MWD+IFR-AK-CAZ-SC(2) 2,630.00 28.82 173.37 2,471.47 2,415.34 -715.81 109.10 5,956,775.56 378,135.75 0.72 691.19 MWD+IFR-AK-CAZ-SC(3) 2,701.23 25.29 176.50 2,534.90 2,478.77 -748.06 112.01 5,956,743.26 378,138.14 5.34 721.45 MWD+IFR-AK-CAZ-SC(3) 2,753.75 26.66 178.85 2,582.12 2,525.99 -771.04 112.94 5,956,720.27 378,138.69 3.26 742.51 MWD+IFR-AK-CAZ-SC(3) 2,795.35 27.59 180.72 2,619.14 2,563.01 -790.00 113.00 5,956,701.31 378,138.45 3.03 759.59 MWD+IFR-AK-CAZ-SC(3) 2,889.75 28.14 185.00 2,702.61 2,646.48 -834.04 110.79 5,956,657.32 378,135.52 2.20 798.20 MWD+IFR-AK-CAZ-SC(3) 2,983.34 28.77 185.40 2,784.89 2,728.76 -878.45 106.74 5,956,612.98 378,130.76 0.70 836.34 MWD+IFR-AK-CAZ-SC(3) 3,073.21 31.65 185.53 2,862.54 2,806.41 -923.46 102.44 5,956,568.05 378,125.72 3.21 874.90 MWD+IFR-AK-CAZ-SC(3) 3,167.91 35.00 185.69 2,941.66 2,885.53 -975.23 97.35 5,956,516.38 378,119.79 3.54 919.20 MWD+IFR-AK-CAZ-SC(3) ' 3,261.69 37.81 188.02 3,017.14 2,961.01 -1,030.47 90.67 5,956,461.26 378,112.22 3.34 965.93 MWD+IFR-AK-CAZ-SC(3) 3,355.53 40.05 186.44 3,090.13 3,034.00 -1,088.96 83.27 5,956,402.90 378,103.87 2.61 1,015.25 MWD+IFR-AK-CAZ-SC(3) 3,449.68 42.49 184.31 3,160.89 3,104.76 -1,150.78 77.48 5,956,341.19 378,097.08 2.99 1,068.28 MWD+IFR-AK-CAZ-SC(3) 3,543.26 44.81 185.78 3,228.60 3,172.47 -1,215.12 71.78 5,956,276.96 378,090.34 2.71 1,123.61 MWD+IFR-AK-CAZ-SC(3) 3,637.66 46.80 186.43 3,294.41 3,238.28 -1,282.41 64.58 5,956,209.80 378,082.05 2.17 1,180.93 MWD+IFR-AK-CAZ-SC(3) 3,729.44 48.35 186.61 3,356.32 3,300.19 -1,349.72 56.88 5,956,142.63 378,073.26 1.70 1,238.05 MWD+IFR-AK-CAZ-SC(3) 3,825.67 50.22 185.96 3,419.09 3,362.96 -1,422.21 48.91 5,956,070.28 378,064.11 2.01 1,299.72 MWD+IFR-AK-CAZ-SC(3) 3,916.34 51.86 188.77 3,476.11 3,419.98 -1,492.12 39.85 5,956,000.53 378,053.92 3.01 1,358.58 MWD+IFR-AK-CAZ-SC(3) 4,008.98 53.25 186.76 3,532.43 3,476.30 -1,564.99 29.93 5,955,927.84 378,042.82 2.28 1,419.72 MWD+IFR-AK-CAZ-SC(3) 4,102.02 55.16 188.42 3,586.85 3,530.72 -1,639.78 19.95 5,955,853.22 378,031.63 2.51 1,482.57 MWD+IFR-AK-CAZ-SC(3) 4,192.59 56.68 192.12 3,637.61 3,581.48 -1,713.57 6.55 5,955,779.67 378,017.04 3.78 1,543.02 MWD+IFR-AK-CAZ-SC(3) 4,285.68 57.58 189.86 3,688.14 3,632.01 -1,790.31 -8.34 5,955,703.18 378,000.90 2.26 1,605.47 MWD+IFR-AK-CAZ-SC(3) 4,379.72 57.64 190.22 3,738.52 3,682.39 -1,868.51 -22.19 5,955,625.23 377,985.79 0.33 1,669.68 MWD+IFR-AK-CAZ-SC(3) 4,472.24 57.74 189.51 3,787.97 3,731.84 -1,945.55 -35.58 5,955,548.43 377,971.15 0.66 1,733.05 MWD+IFR-AK-CAZ-SC(3) 6/27/2011 9:28:21AM Page 3 COMPASS 2003.16 Build 69 4 ConocoPhillips (Alaska) Inc. Definitive Survey Report Company: ConocoPhillips(Alaska)Inc. Local Co-ordinate Reference: Well CD4-208 Project: Western North Slope TVD Reference: Rig:CD4-208 @ 56.13ft(Doyon 19(19.8+36.33) Site: WNS Non-pad MD Reference: Rig:CD4-208 @ 56.13ft(Doyon 19(19.8+36.33) Well: CD4-208 North Reference: True Wellbore: CD4-208APB1 Survey Calculation Method: Minimum Curvature Design: CD4-208APB1 Database: CPAI EDM Production Survey Map Map Vertical MD Inc Azi TVD TVDSS +N/-S +E/-W Northing Easting DLS Section (ft) (°) (°) (ft) (ft) (ft) (ft) (ft) (ft) (°/100') (ft) Survey Tool Name 4,567.09 57.88 190.03 3,838.50 3,782.37 -2,024.65 -49.20 5,955,469.56 377,956.25 0.49 1,798.18 MWD+IFR-AK-CAZ-SC(3) 4,661.11 58.25 191.13 3,888.23 3,832.10 -2,103.08 -63.85 5,955,391.38 377,940.33 1.07 1,862.25 MWD+IFR-AK-CAZ-SC(3) 4,751.65 58.57 191.46 3,935.66 3,879.53 -2,178.71 -78.96 5,955,316.01 377,924.00 0.47 1,923.60 MWD+IFR-AK-CAZ-SC(3) 4,847.16 56.92 191.03 3,986.63 3,930.50 -2,257.93 -94.71 5,955,237.07 377,906.96 1.77 1,987.89 MWD+IFR-AK-CAZ-SC(3) 4,941.61 56.32 189.44 4,038.60 3,982.47 -2,335.54 -108.73 5,955,159.70 377,891.69 1.54 2,051.50 MWD+IFR-AK-CAZ-SC(3) 5,036.13 56.45 189.41 4,090.93 4,034.80 -2,413.19 -121.62 5,955,082.28 377,877.55 0.14 2,115.65 MWD+IFR-AK-CAZ-SC(3) 5,131.13 56.65 189.99 4,143.29 4,087.16 -2,491.32 -134.98 5,955,004.38 377,862.92 0.55 2,180.01 MWD+IFR-AK-CAZ-SC(3) 5,224.44 56.86 189.91 4,194.44 4,138.31 -2,568.19 -148.46 5,954,927.75 377,848.20 0.24 2,243.19 MWD+IFR-AK-CAZ-SC(3) 5,319.70 56.94 190.21 4,246.47 4,190.34 -2,646.76 -162.40 5,954,849.42 377,832.99 0.28 2,307.70 MWD+IFR-AK-CAZ-SC(3) 5,415.64 56.91 189.80 4,298.82 4,242.69 -2,725.93 -176.37 5,954,770.49 377,817.74 0.36 2,372.74 MWD+IFR-AK-CAZ-SC(3) 5,509.64 57.15 190.54 4,349.98 4,293.85 -2,803.55 -190.29 5,954,693.11 377,802.56 0.71 2,436.40 MWD+IFR-AK-CAZ-SC(3) 5,604.85 57.45 190.37 4,401.42 4,345.29 -2,882.34 -204.83 5,954,614.58 377,786.74 0.35 2,500.84 MWD+IFR-AK-CAZ-SC(3) 5,698.95 57.72 191.20 4,451.86 4,395.73 -2,960.38 -219.70 5,954,536.80 377,770.61 0.80 2,564.46 MWD+IFR-AK-CAZ-SC(3) 5,791.48 57.88 191.56 4,501.17 4,445.04 -3,037.13 -235.15 5,954,460.31 377,753.92 0.37 2,626.68 MWD+IFR-AK-CAZ-SC(3) 5,887.81 57.14 189.69 4,552.91 4,496.78 -3,116.99 -250.13 5,954,380.72 377,737.64 1.81 2,691.88 MWD+IFR-AK-CAZ-SC(3) 5,982.65 57.22 190.56 4,604.32 4,548.19 -3,195.45 -264.14 5,954,302.50 377,722.36 0.78 2,756.26 MWD+IFR-AK-CAZ-SC(3) 6,076.84 57.46 191.02 4,655.15 4,599.02 -3,273.34 -278.99 5,954,224.87 377,706.26 0.48 2,819.76 MWD+IFR-AK-CAZ-SC(3) 6,171.76 56.71 189.99 4,706.73 4,650.60 -3,351.69 -293.52 5,954,146.77 377,690.46 1.21 2,883.80 MWD+IFR-AK-CAZ-SC(3) 6,266.09 56.96 190.74 4,758.33 4,702.20 -3,429.36 -307.73 5,954,069.35 377,674.99 0.72 2,947.39 MWD+IFR-AK-CAZ-SC(3) 6,360.51 57.21 190.58 4,809.64 4,753.51 -3,507.25 -322.39 5,953,991.71 377,659.07 0.30 3,010.97 MWD+IFR-AK-CAZ-SC(3) 6,454.72 57.64 190.76 4,860.36 4,804.23 -3,585.27 -337.09 5,953,913.94 377,643.11 0.48 3,074.65 MWD+IFR-AK-CAZ-SC(3) 6,548.85 57.85 190.93 4,910.60 4,854.47 -3,663.45 -352.07 5,953,836.02 377,626.87 0.27 3,138.36 MWD+IFR-AK-CAZ-SC(3) 6,64428 57.28 190.08 4,961.78 4,905.65 -3,742.64 -366.75 5,953,757.09 377,610.90 0.96 3,203.09 MWD+IFR-AK-CAZ-SC(3) 6,739.44 57.52 190.09 5,013.05 4,956.92 -3,821.57 -380.79 5,953,678.40 377,595.58 0.25 3,267.88 MWD+IFR-AK-CAZ-SC(3) 6,833.65 57.66 190.42 5,063.54 5,007.41 -3,899.84 -394.95 5,953,600.38 377,580.16 0.33 3,332.02 MWD+IFR-AK-CAZ-SC(3) 6,927.33 57.95 190.56 5,113.46 5,057.33 -3,977.79 -409.38 5,953,522.68 377,564.46 0.33 3,395.75 MWD+IFR-AK-CAZ-SC(3) 7,022.68 58.16 190.43 5,163.91 5,107.78 -4,057.35 -424.12 5,953,443.38 377,548.44 0.25 3,460.80 MWD+IFR-AK-CAZ-SC(3) 7,118.01 58.39 190.54 5,214.04 5,157.91 -4,137.08 -438.88 5,953,363.91 377,532.39 0.26 3,525.99 MWD+IFR-AK-CAZ-SC(3) 7,212.02 57.06 190.91 5,264.23 5,208.10 -4,215.17 -453.67 5,953,286.07 377,516.34 1.45 3,589.70 MWD+IFR-AK-CAZ-SC(3) 7,306.99 57.12 190.67 5,315.83 5,259.70 -4,293.49 -468.59 5,953,208.01 377,500.14 0.22 3,653.55 MWD+IFR-AK-CAZ-SC(3) 7,401.13 57.32 190.77 5,366.80 5,310.67 -4,371.26 -483.31 5,953,130.50 377,484.16 0.23 3,716.99 MWD+IFR-AK-CAZ-SC(3) 7,496.10 57.29 191.83 5,418.10 5,361.97 -4,449.63 -498.97 5,953,052.40 377,467.24 0.94 3,780.57 MWD+IFR-AK-CAZ-SC(3) 7,590.81 57.37 191.15 5,469.23 5,413.10 -4,527.76 -514.86 5,952,974.54 377,450.09 0.61 3,843.83 MWD+IFR-AK-CAZ-SC(3) 7,685.30 57.52 191.29 5,520.07 5,463.94 -4,605.88 -530.35 5,952,896.69 377,433.33 0.20 3,907.25 MWD+IFR-AK-CAZ-SC(3) 7,779.49 57.72 191.61 5,570.52 5,514.39 -4,683.84 -546.14 5,952,819.00 377,416.28 0.36 3,970.40 MWD+IFR-AK-CAZ-SC(3) 7,873.98 57.88 191.64 5,620.87 5,564.74 -4,762.16 -562.25 5,952,740.96 377,398.90 0.17 4,033.72 MWD+IFR-AK-CAZ-SC(3) 7,967.97 57.92 191.87 5,670.81 5,614.68 -4,840.11 -578.48 5,952,663.29 377,381.42 0.21 4,096.67 MWD+IFR-AK-CAZ-SC(3) 8,062.33 57.88 191.85 5,720.96 5,664.83 -4,918.34 -594.90 5,952,585.35 377,363.72 0.05 4,159.78 MWD+IFR-AK-CAZ-SC(3) 8,156.99 57.66 191.78 5,771.44 5,715.31 -4,996.71 -611.30 5,952,507.25 377,346.06 0.24 4,223.04 MWD+IFR-AK-CAZ-SC(3) 8,251.94 57.50 191.72 5,822.34 5,766.21 -5,075.19 -627.62 5,952,429.06 377,328.47 0.18 4,286.42 MWD+IFR-AK-CAZ-SC(3) 6/27/2011 9:28:21AM Page 4 COMPASS 2003.16 Build 69 ConocoPhillips (Alaska) Inc. Definitive Survey Report Company: ConocoPhillips(Alaska)Inc. Local Co-ordinate Reference: Well CD4-208 Project: Western North Slope TVD Reference: Rig:CD4-208 @ 56.13ft(Doyon 19(19.8+36.33) Site: WNS Non-pad MD Reference: Rig:CD4-208 @ 56.13ft(Doyon 19(19.8+36.33) Well: CD4-208 North Reference: True Wellbore: CD4-208APB1 Survey Calculation Method: Minimum Curvature Design: CD4-208APB1 Database: CPAI EDM Production Survey Map Map Vertical MD Inc Azi TVD TVDSS +N/-S +E/-W Northing Easting DLS Section (ft) (°) (°) (ft) (ft) (ft) (ft) (ft) (ft) (°1100') (ft) Survey Tool Name 8,345.97 57.52 191.64 5,872.85 5,816.72 -5,152.86 -643.68 5,952,351.67 377,311.15 0.07 4,349.19 MWD+IFR-AK-CAZ-SC(3) 8,440.75 57.63 191.93 5,923.67 5,867.54 -5,231.17 -660.02 5,952,273.63 377,293.55 0.28 4,412.42 MWD+IFR-AK-CAZ-SC(3) 8,534.14 57.59 192.11 5,973.70 5,917.57 -5,308.31 -676.44 5,952,196.79 377,275.88 0.17 4,474.54 MWD+IFR-AK-CAZ-SC(3) 8,627.47 57.73 190.82 6,023.63 5,967.50 -5,385.58 -692.11 5,952,119.78 377,258.95 1.18 4,537.13 MWD+IFR-AK-CAZ-SC(3) 8,721.64 57.48 190.34 6,074.08 6,017.95 -5,463.75 -706.71 5,952,041.87 377,243.09 0.51 4,600.98 MWD+IFR-AK-CAZ-SC(3) 8,815.70 58.38 190.69 6,124.02 6,067.89 -5,542.11 -721.26 5,951,963.76 377,227.27 1.01 4,665.04 MWD+IFR-AK-CAZ-SC(3) 8,907.01 58.73 191.15 6,171.66 6,115.53 -5,618.60 -736.02 5,951,887.52 377,211.28 0.58 4,727.32 MWD+IFR-AK-CAZ-SC(3) 9,002.06 58.25 190.93 6,221.33 6,165.20 -5,698.14 -751.54 5,951,808.26 377,194.47 0.54 4,792.00 MWD+IFR-AK-CAZ-SC(3) 9,096.55 58.96 187.75 6,270.57 6,214.44 -5,777.71 -764.61 5,951,728.91 377,180.11 2.97 4,857.78 MWD+IFR-AK-CAZ-SC(3) 9,191.21 58.94 185.59 6,319.39 6,263.26 -5,858.25 -774.03 5,951,648.54 377,169.38 1.95 4,926.05 MWD+IFR-AK-CAZ-SC(3) 9,285.05 57.52 182.87 6,368.81 6,312.68 -5,937.80 -779.93 5,951,569.11 377,162.20 2.89 4,994.96 MWD+IFR-AK-CAZ-SC(3) 9,380.11 55.61 179.75 6,421.19 6,365.06 -6,017.08 -781.77 5,951,489.87 377,159.07 3.40 5,065.41 MWD+IFR-AK-CAZ-SC(3) 9,474.23 56.11 177.15 6,474.02 6,417.89 -6,094.94 -779.66 5,951,411.99 377,159.92 2.35 5,136.32 MWD+IFR-AK-CAZ-SC(3) 9,569.18 56.34 172.54 6,526.82 6,470.69 -6,173.52 -772.56 5,951,333.32 377,165.74 4.04 5,210.05 MWD+IFR-AK-CAZ-SC(3) 9,663.18 57.33 170.95 6,578.25 6,522.12 -6,251.38 -761.26 5,951,255.29 377,175.78 1.76 5,284.99 MWD+IFR-AK-CAZ-SC(3) 9,758.07 57.75 166.47 6,629.20 6,573.07 -6,329.86 -745.59 5,951,176.57 377,190.17 4.01 5,362.40 MWD+IFR-AK-CAZ-SC(3) 9,852.12 58.12 165.11 6,679.13 6,623.00 -6,407.12 -726.02 5,951,099.01 377,208.48 1.29 5,440.42 MWD+IFR-AK-CAZ-SC(3) 9,947.16 57.70 162.67 6,729.62 6,673.49 -6,484.47 -703.68 5,951,021.31 377,229.56 2.22 5,519.73 MWD+IFR-AK-CAZ-SC(3) 10,041.55 56.72 159.28 6,780.75 6,724.62 -6,559.48 -677.83 5,950,945.91 377,254.19 3.19 5,598.47 MWD+IFR-AK-CAZ-SC(3) 10,136.32 56.42 158.58 6,832.96 6,776.83 -6,633.28 -649.40 5,950,871.66 377,281.42 0.69 5,677.27 MWD+IFR-AK-CAZ-SC(3) 10,230.69 56.47 158.40 6,885.12 6,828.99 -6,706.44 -620.57 5,950,798.04 377,309.06 0.17 5,755.67 MWD+IFR-AK-CAZ-SC(3) 10,325.41 57.21 158.83 6,936.93 6,880.80 -6,780.28 -591.65 5,950,723.75 377,336.77 0.87 5,834.71 MWD+IFR-AK-CAZ-SC(3) 10,419.84 57.80 158.65 6,987.66 6,931.53 -6,854.50 -562.77 5,950,649.07 377,364.44 0.65 5,914.08 MWD+IFR-AK-CAZ-SC(3) 10,514.23 59.36 157.96 7,036.87 6,980.74 -6,929.34 -533.00 5,950,573.77 377,392.99 1.77 5,994.40 MWD+IFR-AK-CAZ-SC(3) 10,608.52 61.17 157.46 7,083.63 7,027.50 -7,005.10 -501.94 5,950,497.53 377,422.81 1.97 6,076.10 MWD+IFR-AK-CAZ-SC(3) 10,703.68 62.61 155.92 7,128.47 7,072.34 -7,082.17 -468.72 5,950,419.93 377,454.78 2.08 6,159.94 MWD+IFR-AK-CAZ-SC(3) 10,797.14 6403 155.78 7,170.43 7,114.30 -7,158.37 -434.56 5,950,343.19 377,487.70 1.53 6,243.40 MWD+IFR-AK-CAZ-SC(3) 10,893.03 66.91 155.34 7,210.24 7,154.11 -7,237.78 -398.46 5,950,263.22 377,522.49 3.03 6,330.60 MWD+IFR-AK-CAZ-SC(3) 10,987.51 66.78 153.51 7,247.39 7,191.26 -7,316.13 -360.96 5,950,184.27 377,558.71 1.79 6,417.46 MWD+IFR-AK-CAZ-SC(3) 11,082.30 68.71 151.73 7,283.29 7,227.16 -7,394.02 -320.62 5,950,105.74 377,597.79 2.68 6,505.15 MWD+IFR-AK-CAZ-SC(3) 11,176.31 73.26 152.37 7,313.92 7,257.79 -7,472.52 -278.97 5,950,026.59 377,638.15 4.88 6,593.96 MWD+IFR-AK-CAZ-SC(3) 11,269.64 78.05 151.67 7,337.03 7,280.90 -7,552.34 -236.56 5,949,946.10 377,679.26 5.18 6,684.30 MWD+IFR-AK-CAZ-SC(3) 11,315.26 82.11 152.81 7,344.89 7,288.76 -7,592.10 -215.64 5,949,906.01 377,699.53 9.23 6,729.20 MWD+IFR-AK-CAZ-SC(3) 11,363.03 83.06 152.67 7,351.06 7,294.93 -7,634.21 -193.94 5,949,863.55 377,720.54 2.01 6,776.56 MWD+IFR-AK-CAZ-SC(3) 11,456.88 85.85 152.76 7,360.12 7,303.99 -7,717.22 -151.12 5,949,779.87 377,762.00 2.97 6,869.94 MWD+IFR-AK-CAZ-SC(3) 11,551.56 85.72 152.23 7,367.08 7,310.95 -7,800.97 -107.52 5,949,695.43 377,804.24 0.57 6,964.33 MWD+IFR-AK-CAZ-SC(3) 11,646.40 86.78 152.67 7,373.29 7,317.16 -7,884.87 -63.74 5,949,610.83 377,846.64 1.21 7,058.93 MWD+IFR-AK-CAZ-SC(3) 11,665.63 87.76 152.94 7,374.20 7,318.07 -7,901.96 -54.97 5,949,593.61 377,855.14 5.29 7,078.14 MWD+IFR-AK-CAZ-SC(3) 11,703.00 87.76 152.94 7,375.66 7,319.53 -7,935.21 -37.98 5,949,560.09 377,871.59 0.00 7,115.47 PROJECTED to TD 6/27/2011 9:28:21AM Page 5 COMPASS 2003.16 Build 69 r:D4-208A Well Work Summary DATE SUMMARYOPS 3/22/11 TBG OPEN TO 2.80" TO 6725' RKB. MEASURED BHP © 6701' SLM: 2708/TEL. 129. READY FOR E- LINE. 3/24/11 SHOOT 2.0"TUBING PUNCH GUN USING 6.5 gram CIRCULATION CHARGES 4SPF 0 DEG PHASING. TOP SHOT DEPTH=6660.5" BOTTOM SHOT=6665.5' CCL TO TOP SHOT=8.5' CCL STOP DEPTH=6652.0'. AFTER SHOT WAS FIRED OBSERVED IA DROP FROM 800 PSI TO 100 PSI, TUBING WENT UP FROM 400 PSI TO 475 PSI. 3/26/11 PERFORM INJECTIVITY TEST POST TBG HOLE PUNCH, ESTABLISHED 2.0 BPM DOWN IA @ 425 PSI. WELL READY FOR CTU CEMENT JOB. 3/30/11 RIG UP COIL, PERFORM WEEKLY BOP TEST. 3/31/11 PUMPED 15 BBLS OF 15.8 CLASS G CEMENT THROUGH RETAINER SET AT 6700 CTMD, PULLED OUT OF RETAINER, PUSHED 50 BBLS CEMENT IN IA, PUMPED ADDITIONAL 15 BBLS IN 3.5 TUBING TO TOC TO 4935 FT. WELL IS FREEZE PROTECTED TO 3000 FT. 4/2/11 TAGGED @ 4949' SLM. MIT IA @ 2500 PSI. PASSED. MIT TBG @ 2500 PSI. PASSED. PULLED DV @ 4416' RKB. JOB SUSPENDED AWAITING SEAWATER. 4/3/11 SET DV @ 4416' RKB. VERIFY SET. READY FOR E-LINE. 4/5/11 PERFORMED TUBING CUT WITH 2.70" JRC JET CUTTER AT 3100' RKB. TUBING AND I/A PRESSURE EQUALIZED TO 550 PSI AFTER CUT. TIED-IN TO GLM AT 4416' RKB 7/3/11 PULLED ISO SLV @ 2051' RKB. PULLED BALL & ROD @ 11,729' SLM. PULLED SOV AND SET GLV(3/16" TRO=1928) @ 8119' RKB. PULLED DV AND SET OV(1/4") @ 11,578' RKB. IN PROGRESS. 7/5/11 PULLED RHC @ 11,750 RKB. PERFORMED SBHPS @ 11,750' RKB w/GRADIENT STOP @ 11,250' RKB. (MAX TEMP=159 PSI=3316) SET 3.81" DB ON WRDP-2 IN BP-6i @ 2051' RKB. NO CLOSURE TEST. COMPLETE. ConocoPhiIIips Time Log & Summary WeRview Web Repo,Ting Report Well Name: CD4-208 Rig Name: DOYON 19 Job Type: DRILLING SIDETRACK Rig Accept: 5/15/2011 12:00:00 AM Rig Release: 7/1/2011 11:59:00 PM Time Logs Date From To Dur S. Depth E.Depth Phase Code Subcode T Comment 04/06/2011 24 hr Summary W.O.trucks for rig move 08:00 00:00 16.00 0 0 MIRU MOVE OTHR T W.O.Trucks from Deadhorse. Preparing rig for move and performing rig maintenance. 04/07/2011 W.O.trucks until released from BP. Started moving rig to CD4-08 00:00 12:00 12.00 0 0 MIRU MOVE OTHR T Waited on trucks from Deadhorse. Prepare rig for moving and perform general rig maintenance. 12:00 00:00 12.00 0 0 MIRU MOVE MOB P Move rig from CD3 to CD4-08. 04/08/2011 Complete rig move to CD4-08. Accepted rig 0800,4/08/2011. Displace well to mud, ND tree, NU BOPE and begin test. 00:00 08:00 8.00 0 0 MIRU MOVE MOB P Continue moving rig from CD3 to CD4. PJSM to RU elec., steam,air, glycol and steam service lines. Work on all acceptance items. 08:00 10:30 2.50 0 0 SLOT DRILL PRTS P Rig accepted at 0800 4/8/2011. PJSM for PT IA. Tested IA to 2000 PSI with 1.8 BBL. Tested tree adapter to 5000 PSI for 10 min. RU FMC lubricatior and test to 250/2000 PSI for 5 min each. Pull BPV and R/D lubricator. 10:30 12:45 2.25 0 0 SLOT DRILL CIRC P RU circ lines to choke skid&tiger tank. PT lines to 2000 PSI. Held spill drill. Response time of 2 minutes. Rig put on High Line power @ 1130 am. 12:45 14:30 1.75 0 0 SLOT DRILL CIRC P Displace well with 50 BBL fresh H20, 35 BBL Flozan pill and 120 BBL of 9.6 PPG LSND mud @ 3 BPM holding 500 PSI with choke. ICP= 200 PSI. After displacement, SI well and pressure was zero. Open and monitor for 10 minutes, no flow. 14:30 18:45 4.25 0 0 SLOT WHDBO NUND P Set BPV and test to 1500 PSI. Bleed to zero, ND tree, install blanking plug and NU BOPE. 18:45 19:30 0.75 0 0 SLOT WHDBO OTHR T Incident occured when a roustabout on the rig floor rolled his ankle. Due to his inability to walk down the stairs,Alpine security was called and the ambulance responded to take him off the rig and to the medic. kF Page 1 of 49 Time Logs Date From To Dur S. Depth E. Depth Phase Code Subcode T Comment 19:30 20:45 1.25 0 0 SLOT WHDBO SFTY T Held Safety Stand Down. Investigated the accident scene, discussed the responsibility of all personnel to stop the job if it is unsafe. Reiterated that we are not in a hurry to get the job done and all jobs must have a PJSM. 20:45 22:00 1.25 0 0 SLOT WHDBO BOPE P Returned to work. PJSM on testing the BOPE. RU to test. 22:00 00:00 2.00 0 0 SLOT WHDBO BOPE P Test BOPE, upper VBR, choke manifold, upper&lower IBOP to 250 /3500 fro 5 min with 3.5"and 4.5: test joint. 04/09/2011 Test BOPE. POOH w/96 Jts plus cut jt.of 3-1/2"tubing. Run and set CIBP @ 2710'MD. Cut 7"casing @ 2700'MD. 00:00 03:30 3.50 0 0 ISLOT WHDBO BOPE P PJSM. Cont.Testing BOPE. Tested upper 3.5"X 6"VBRs w/3.5" and 4.5"test joints. Also choke valve#2, HCR Choke,4"Demco, dart valve, F.O.safety valve, blinds to 250/3500 PSI. Tested annular w/ 3.5"and 4.5"test joints to 250/ 2500 PSI. Accumulator test- system pressure start-3000 PSI; after close pres= 1850 psi. Increased 200 PSI in 35 sec,full pres in 3 min.28 sec. N2 bottle AVE=2050 PSI. 03:30 04:30 1.00 0 0 SLOT WHDBO BOPE P Pull blanking plug. RD all test equip. 04:30 05:30 1.00 0 0 SLOT DRILL PULL P Mob casing equip and RU to pull 3-1/2"tubing 05:30 10:00 4.50 0 0 SLOT DRILL PULL P Unseat hanger and POOH wit 2 jts 4.5"tubing and 96 joints+one 12' _cut jnt. 3-1/2"tubing. 10:00 11:00 1.00 0 0 SLOT DRILL PULL P RD casing equip 11:00 11:30 0.50 0 0 SLOT DRILL MPSP P Mob CIBP to rig floor. 11:30 14:00 2.50 0 0 SLOT WHDBO MPSP P RU and test lower 2-7/8"X 5"VBRs to 250/3500 PSI f/5 min. 14:00 18:30 4.50 0 0 SLOT DRILL TRIP P PJSM. MU CIBP, RIH on 4"drillpipe. Set at 2710'MD. POOH. 18:30 19:00 0.50 0 0 SLOT DRILL TRIP P POOH 9 stabds standing back 4" DP. Snagged man rider line with rotary hose and damaged rotary hose. 19:00 19:30 0.50 0 0 SLOT RIGMNT SFTY T Inspected hose and determined it needed to be replaced. Held safety stand down with crew. 19:30 20:15 0.75 0 0 SLOT DRILL TRIP P Cont. POOH and LD BHA 20:15 21:45 1.50 0 0 SLOT RIGMNT RGRP T PJSM. Remove rotary hose and send to shop to swap out connections. 21:45 00:00 2.25 0 2,547 SLOT DRILL TRIP P PJSM. MU Baker casing cutter. RIH to 2547'. Page 2 of 49 Time Logs Date From To Dur S. Depth E. Depth Phase Code Subcode T Comment 04/10/2011 24 hr Summary Cut 7"casing in two spots. Circ'd out freeze protect. Pulled 1st 2530'of casing. RIH and speared 2nd 180' of casing. 00:00 03:00 3.00 2,547 2,547 SLOT RIGMN1 RGRP T Install new rotary hose and test to 3000 PSI 03:00 04:00 1.00 2,547 2,700 SLOT DRILL TRIP P Continue RIH with Baker Casing cutter from 2547' to 2710'MD and tag CIBP. PU and locate collar @ 2682'MD. Locate cutter @ 2700' MD and make first cut @ 70 RPM, Torque=1K, .5 BPM and 950 PSI. PU=65K, SO=65K. Observe 150 PSI increase on OA after cut. 04:00 05:00 1.00 2,700 2,530 SLOT DRILL CPBO P PU and locate cutter @ 2530'MD (ck for collars in area)and make second cut @ 70 RPM,Torque= 1K, .5 BPM and 950 PSI. PU=65K, SO =65K. Observe 500 PSI increase on OA after cut. 05:00 05:30 0.50 2,530 2,530 SLOT DRILL CIRC P Displace OA with 9.6 PPG mud @ 4 BPM, ICP=600 PSI, FCP=900 PSI. Pumped 100 BBLS total. Monitor well,static. 05:30 07:30 2.00 2,530 0 SLOT DRILL TRIP P POOH w/Baker mechanical cutter and LD BHA. 07:30 08:30 1.00 0 0 SLOT WHDBO BOPE P Clear floor. Pull Wear bushing 08:30 11:30 3.00 0 0 SLOT WHDBO BOPE P PJSM. C/O top rams to 7". Set test plug and RU test equip. 11:30 12:00 0.50 0 0 SLOT WHDBO BOPE P Test annular with 7"test joint to 250/2500 psi, upper pipe rams 250/3500 PSI,each for 5 min, charted. 12:00 13:30 1.50 0 0 SLOT WHDBO BOPE P RD test equip, pull test plug, pull 7" pack-off and set casing wear ring. 13:30 15:15 1.75 0 0 SLOT DRILL FISH P MU spear assembly. RIH,engage hanger and pull free @ 88k. PU 3' and circ two BU @ 5 BPM and 150 PSI. Pull hanger to rig floor, LD spear assembly and monitor well for 30 minutes, static. 15:15 17:45 2.50 0 0 SLOT DRILL FISH P PJSM. RU casing equipment and POOH w/7"casing. 17:45 19:15 1.50 0 0 SLOT DRILL FISH P RD casing equipment. Pull wear ring, set test plug. 19:15 20:15 1.00 0 0 SLOT WHDBO BOPE P PJSM. C/O upper rams to 3.5 X 6" VBR's. 20:15 21:15 1.00 0 0 SLOT WHDBO BOPE P Test 3.5 X 6"VBR's to 250/3500 PSI. 21:15 22:00 0.75 0 0 SLOT WHDBO BOPE P RD test equipment, install wear ring, mobilize fishing tools to floor. 22:00 00:00 2.00 0 750 SLOT DRILL FISH P MU spear assembly and begin RIH to 750'. 04/11/2011 POOH w/7"casing stub. RIH w/cement/kill string. Pump cement plug. CIP @ 1845. Land tubing. WOC 15 hrs. Page 3 of 49 Time Logs Date From To Dur S. Depth E. Depth Phase Code Subcode T Comment 00:00 02:00 2.00 750 2,486 SLOT DRILL FISH P Continue in hole with Baker spear assembly to 2486'. PU =82K,SO =75K. Engage fish and set grapple. Make straight pull to 200K, then apply 850 psi with no circulation. Hit jars 5 times w/225K. Pull 275 K and apply 500 PSI. Fish started to move and circ started gradually up to 1.7 BPM. Pulled 90' and established circ at 3 BPM @ 500 PSI. Held Kick while tripping drill. 02:00 03:30 1.50 2,486 2,486 SLOT DRILL FISH P Circulate 2 BU, 320 BBL total. 4.5 BPM, ICP=700 PSI, FCP=250 PSI. SD and monitor well for 30 minutes. 03:30 11:00 7.50 2,486 0 SLOT DRILL FISH P Attempt to POOH on elevators,well swabbing. Pumped out of hole @ 2 BPM @ 150 PSI to 2298'MD. Attempt to POOH on elevators and got good hole fill. POOH and LD BHA w/fish. 11:00 11:30 0.50 0 0 SLOT RIGMN1SVRG P Lubricate rig 11:30 13:15 1.75 0 0 SLOT DRILL RURD P RU 3-1/2"casing equipment 13:15 16:15 3.00 0 2,685 SLOT DRILL TRIP P PJSM. RIH w/3-1/2"tubing and tag CIBP @ 2710'MD. PU to 2685'for cement job. 16:15 18:15 2.00 2,685 2,685 SLOT CEMEN-CMNT P RU cementers. Batch up cement. PT lines to 2500 PSI. 18:15 18:45 0.50 2,685 2,685 SLOT CEMEN-CMNT P Pump 10 BBL of MudPush II, 19.5 BBL of 17.0 PPG cement followed by 2 BBL of MudPush II. Swapped to rig pumps and pumped 16 BBL of mud displacement. CIP at 1845, 4/11/2011. 18:45 19:30 0.75 2,685 2,288 SLOT DRILL TRIP P POOH from 2685 to 2288'MD. 19:30 21:00 1.50 2,288 2,288 SLOT DRILL CIRC P Drop tubing wiper ball and pumped 40 BBL of 10 PPB nut plug sweep at 7 BPM followed by 2 BU, 300 BBL of 9.6 Mud. 21:00 23:00 2.00 2,288 2,004 SLOT DRILL TRIP P POOH from 2288 to 2004. MU tubing hanger and land in wellhead. 23:00 00:00 1.00 2,004 2,004 SLOT DRILL PRTS P Run in LDS and RU to test hanger seals to 5000 PSI. 04/12/2011 Landed tubing hanger and tested. WOC for 15 hrs. Tested cement to 2000 psi for 30 min. Good test. ND BOP and NU tree and test. Displace mud,freeze protect well w/diesel. Clean pits and prepare to move to CD4-210. 00:00 01:30 1.50 0 0 SLOT DRILL PRTS P PJSM. Test hanger seals to 250/5000 PSI for 5 min. RD test equip and landing jt. LD casing tools from floor. 01:30 02:30 1.00 0 0 SLOT RIGMNT SLPC P PJSM. Cut drilling line Page 4 of 49 4 Time Logs Date From To Dur S. Depth E. Depth Phase Code Subcode T Comment 02:30 10:00 7.50 0 0 SLOT CEMEN"WOC P WOC for 15 hrs from CIP time. Routine maintenance,cleaning, move prep in progress. 10:00 11:30 1.50 0 0 SLOT CEMEN-PRTS P PT cement through IA to 2000 PSI for 30 min on chart. Good test. 11:30 14:30 3.00 0 0 SLOT DRILL NUND P PJSM. ND BOPE. NU tree and test. 14:30 15:00 0.50 0 0 SLOT DRILL NUND P Pull two way check and RU to circulate. 15:00 16:15 1.25 0 0 SLOT DRILL CIRC P PJSM. Displace mud from wellbore with water @ 8 BPM and 650 PSI _initial and 800 PSI final PSI. 16:15 21:00 4.75 0 0 SLOT DRILL FRZP P RU Little Red and freeze protect well bore with diesel. Pumped 130 BBL. U-tube well and set BPV. OFF HIGH LINE @ 1800. 21:00 00:00 3.00 0 0 SLOT DRILL DMOB P Remove secondary annulus valve, install tapped flanges,secure wellhead,clean pits&rock washer. Release Rig @ 2400 4/12/2011. 05/14/2011 Move Doyon 19 to CD4-208A.Spot sub and complexes.Skid rig floor over well. Rig up. 00:00 21:00 21.00 0 0 MIRU MOVE MOB P Disconnect&separate modules. Moved motor complex, pit complex& sub base f/CD1 to CD4-208A. Sub on location @ 1630 hrs. (Pipe shed moved to location yesterday). Spot sub base. Set back windwall with crane. Shim sub. 21:00 00:00 3.00 0 0 MIRU MOVE PSIT P Skid rig floor in to position over well. Move complexes in to position. Hold PJSM and prepare to move ball mill into position. 05/15/2011 Accept rig at 00:00 hrs on 5/15/2011. Test cmt plug&9 5/8"casing to 2500 psi for 30 min. Displace freeze protect diesel from tubing and IA. Install TWC. ND Xmas tree. NU BOPE&body test to 250/2500 psi. Unseat tubing hanger and monitor well. Pull 3.5"killstring. LD 64 jts of tubing. RU&commence BOP test. 00:00 01:45 1.75 0 0 MIRU MOVE RURD P Rig up service lines Accepted Rig @ 0000 hrs.5/15/2011 01:45 06:00 4.25 0 0 INTRM1 DRILL PRTS P MU valves outer valves on IA&OA- Take on water-Spot&run lines to Tiger tank-Test tree adapter to 5000 psi for 10 mins.-RU lines to tbg& IA-Test lines to 3000 psi-Test BPV&tbg hanger seals in direction of flow to 2500 psi for 30 mins.-Pull BPV-Rig line to top of tree for displacement 06:00 08:00 2.00 0 0 INTRM1 DRILL CIRC P PJSM On displacement of freeze protect diesel-Displace freeze protect diesel w/30 bbls Safe Surf, 64 bbls fresh water&160 bbls 9.6 ppg LSND mud @ 6 bbls/min @ 360 psi-Shut down-Blow down lines& monitor well for 30 mins.Well static Page 5 of 49 Time Logs Date From To Dur S. Depth E. Depth Phase Code Subcode T Comment 08:00 08:45 0.75 0 0 INTRM1 DRILL PRTS P Install TWC&test in direction of flow to 2500 psi for 10 mins. 08:45 14:30 5.75 0 0 INTRM1 WHDBO NUND P ND tree-Install blanking plug(for Body test). NU BOP stack-Replace fittings for control lines for pipe rams &blind rams(as per Boots&Coots audit). Modify riser&install. 14:30 15:30 1.00 0 0 INTRM1 WHDBO BOPE P MU test jt. Close annular preventer and body test BOP stack to _250/2500 psi for 5 min each test. 15:30 20:30 5.00 0 0 INTRM1 DRILL PULD P Unseat tubing hanger and pull to rig floor. Monitor well-static. RU tubing tongs. LD 3.5"killstring- 64 jts total. 20:30 21:00 0.50 0 0 INTRM1 DRILL RURD P Rig down casing tools and clear floor. 21:00 23:00 2.00 0 0 INTRM1 WHDBO BOPE P PJSM. RU to test BOPE. Set test plug. 23:00 00:00 1.00 0 0 INTRM1 WHDBO BOPE P Test annular preventer to 250/2500 psi for 5 min ea test. Test upper VBR's, IBOP and valves 1, 5, 14, 15, 16 on choke manifold to 250/3500 psi. 05/16/2011 Continue with BOP test to 250/3500 psi. PU 119 stds 5"DP&rack back in derrick. MU motor BHA#1 w/8 3/4"PDC bit. 00:00 03:00 3.00 0 0 INTRM1 WHDBO BOPE P Continue BOP test:- Test manual IBOP and valves 2, 10, 13. Test TIW valve and valves 7, 11, 12. Test dart valve and valves 6,8,9. Test valve 3. Test choke line HCR and 4"Demco on kill line. Test manual choke and manual kill line valves. Test lower VBR's. 3()P Perform accumulator draw down test. Remove test jt.Test blind rams and 15t valves 4,6,9. Verify proper operation of hydraulic and manual chokes. LEL high alarms in cellar&pits are set too high-need calibrating to alarm at 40%of LEL. Re-calibrated by electrician- completed. Test PVT alarms and Flo-Sho. All tests to 250/3500 psi for 5 min ea test. BOP test witnessed by AOGCC Rep Jeff Jones. 03:00 03:30 0.50 0 0 INTRM1 WHDBO BOPE P Pull test plug-set wear bushing 03:30 03:45 0.25 0 0 INTRM1 DRILL SFTY P PJSM on picking up 5"DP 03:45 04:45 1.00 0 0 INTRM1 DRILL PULD P Pick up&stand back 5"drill pipe f/pipe shed Page 6 of 49 Time Logs Date From To Dur S. Depth E. Depth Phase Code Subcode T Comment 04:45 05:15 0.50 0 0 INTRM1 RIGMNTSVRG P Service rig 05:15 12:00 6.75 0 0 INTRM1 DRILL PULD P Continue to pick up&stand back 5" drill pipe f/pipe shed-70 stds picked up of 119. 12:00 12:15 0.25 0 0 INTRM1 DRILL SFTY P PJSM on picking up 5"drill pipe 12:15 20:15 8.00 0 0 INTRM1 DRILL PULD P Continue to pick up&stand back 5" drillpipe f/pipe shed. 119 stands total.Clear and clean rig _floor. 20:15 00:00 3.75 0 763 INTRM1 DRILL PULD P MU components for drilling BHA#1. Upload MWD tools. PU flex collars, HW&jars. 05/17/2011 Continue to M/U BHA#1 -RIH on 5"DP t/2,271'MD-Wash U 2,420'MD-CBU-Test 9 5/8"Casing t/3500 Psi f/30 Minutes-Drill Cement f/2,420'to 2,595'MD-Displace Well t/9.6 PPG Kla-Shield-Drill Cement t/ 2,630'MD-Time Drill f/2,630'to 2,670'MD-CBU-Perform LOT t/14.8 PPGE-Drill f/2,670'to 3,112'MD 00:00 00:45 0.75 763 763 INTRM1 DRILL PULD P Finish PU HWDP.Shallow test MWD.600 gpm @ 1010 psi. 00:45 01:45 1.00 763 2,271 INTRM1 DRILL TRIP P RIH to 2271'. PUW= 145 klbs. SOW = 135 klbs. 01:45 02:30 0.75 2,271 2,420 INTRM1 DRILL CIRC P Wash down from 2271'and tag top of cement at 2420'. h CBU at 6 bpm @ 350 psi. 02:30 04:15 1.75 2,420 2,420 INTRM1 DRILL PRTS P Std abck 1 std DP to 2360'-RU& pressure test 9 5/8"casing to 3500 e psi for 30 mins.-RD-RIH to 2420' 04:15 07:45 3.50 2,420 2,595 INTRM1 CEMEN"DRLG P Drill out cmt f/2420'to 2595'@ 600 gpm @ 1300 psi-70 rpm's-torque 7.5 k 07:45 08:15 0.50 2,595 2,595 INTRM1 CEMEN"CIRC P Circ btms up @ 600 gpm @ 1210 psi -50 rpms'-7.5 k torque-Displace well f/LSND to Kla Shield 9.6 ppg @ 600 gpm @ 1210 psi 08:15 09:15 1.00 2,595 2,630 INTRM1 CEMEN"DRLG P Drilled cement f/2595'to 2630'@ 600 gpm @ 1500 psi-70 rpm's-7.5 K torque 09:15 14:00 4.75 2,630 2,670 INTRM1 DRILL DDRL P Time Drill to Kick Off f/2,630'to 2,670'MD ADT 1.91,AST 1.91,ART P/U 155, S/O 135, Rot 145 S Torque On/Off 7.5/7 600 GPM @ 1560 Psi; ECD 9.91 CD1011 WOB 4-6; RPM 0 n 14:00 14:30 0.50 2,670 2,670 INTRM1 DRILL CIRC P CBU @ 600 GPM w/1500 Psi&70 s ' RPM 14:30 14:45 0.25 2,670 2,549 INTRM1 DRILL TRIP P POOH w/Pumps t/2,549'MD 14:45 15:30 0.75 2,549 2,549 INTRM1 DRILL FIT P R/U and Perform LOT t/14.8 PPG 15:30 15:45 0.25 2,549 2,670 INTRM1 DRILL TRIP P RIH f/2,549'to 2,670'MD Page 7 of 49 Time Logs Date From To Dur S. Death E. Depth Phase Code Subcode T Comment 15:45 00:00 8.25 2,670 3,112 INTRM1 DRILL DDRL P Drill 8%"Hole f/2,670'to 3,112'MD ADT 7.43,AST 3.73,ART 3.7 P/U 167, S/0 140, Rot 160 Torque On/Off 7.5/7.5 640 GPM @ 1770 Psi; ECD 10.46 WOB 3-5; RPM 110 05/18/2011 Drilled 8%"Hole f/3,112'to 4,511'MD 00:00 12:00 12.00 3,112 3,833 INTRM1 DRILL DDRL P Drilled 8 3/4"hole w/motor f/3112' to 3833'MD 3424'TVD ADT-8.12 hrs. AST-2.81 hrs. ART- 5.31 hrs. ECD-10.55 ppg Footage-722' WOB-5/8k RPM-110 GPM- 640 @ 2000 psi String wt. PU 174 SO 147 ROT 161 Torque on/off btm.8/7.5 k 12:00 00:00 12.00 3,833 4,511 INTRM1 DRILL DDRL P Drill 8'/;'Hole f/3,833'to 4,511'MD ADT7.7,AST 1.48,ART 6.22 P/U 183, S/O 151, Rot 166 Torque On/Off 8.5/8.0 :640 GPM @ 2150 Psi; ECD 10.55 ,WOB 7-11; RPM 110 05/19/2011 Continue to Drill 8%"Hole f/4,511'to 5,168'MD-CBU X4-OWFF SStatic)-POOH f/5,074'to 2,549'MD- OWFF(Static)-FIT t/14.5 PPGE on Shoe(12.5 PPGE on Qannik)-RIH U 3,928'MD(Tagged Ledge)- Work Through Ledge @ 3,928'MD-RIH t/5,168'MD-Take SPR's-Continue to Drill f/5,168'to 5,452'MD 00:00 09:30 9.50 4,511 5,168 INTRM1 DRILL DDRL P Drilled 8 3/4"hole w/motor(1.3° fixed bend)f/4511'to 5168'MD 4164' TVD ADT-7.04 hrs=ART-6.73 hrs AST- .31 hrs ECD-10.72 ppg Footage-657' WOB 10/15 k RPM 110 GPM 640 @ 2390 psi String wt. PU 190 SO 155 ROT 172 Torque on/off btm.-9/8.5 k Rig site Geo. picks-Top of Qannik 5030'MD 4088'TVD-Base of pay- 5070'MD 4110'TVD 09:30 11:00 1.50 5,168 5,074 INTRM1 DRILL CIRC P Circ 4 x btms up for wiper trip-570 gpm @ 1870 psi w/60 rpm's-9 k torque-Orient motor&std back 1 std DP to 5074' 11:00 11:15 0.25 5,074 5,074 INTRM1 DRILL OWFF P Blow down TD-Flow ck well static 11:15 12:00 0.75 5,074 4,698 INTRM1 DRILL WPRT P Wiper trip f/5074'to 4698'-Pulling on elevators 12:00 14:30 2.50 4,698 2,549 INTRM1 DRILL WPRT P Cont.w/wiper trip f/4698'to 2549'- Hole in good condition-no tight hole Page 8 of 49 Time Logs Date From To Dur S. Depth E. Depth Phase Code Subcode T Comment 14:30 15:00 0.50 2,549 2,549 INTRM1 DRILL CIRC P Flow ck-well static-Circ btms up @ 640 gpm @ 1890 psi w/30 rpm's- 5 k torque Observed vey little cutting @ shakers 15:00 15:45 0.75 2,549 2,549 INTRM1 DRILL FIT P Blow down TD-RU&perform FIT to 14.5 ppg w/622 psi @ 2440 TVD w/ 9.6 ppg mud-putting 12.53 ppg EMW on Qannik formation-RD& blow down lines 15:45 17:15 1.50 2,549 3,928 INTRM1 DRILL TRIP P Trip back in hole form 2549'-3928' MD. Obtain checkshot survey @ 2790'. 17:15 17:45 0.50 3,928 3,928 INTRM1 DRILL REAM P Tag up on ledge at 3928'MD. Set down 25K, repeat same. Make up Top Drive and wash through ledge with no issues. Pumps at 400 GPM's -1500 PSI.Work through spot with no pumps observing clean hole. 17:45 18:45 1.00 3,928 5,168 INTRM1 DRILL TRIP P Continue trip in hole form 3928'- 5168', observing good hole conditions &proper displacement. 18:45 19:00 0.25 5,168 5,168 INTRM1 DRILL CIRC P Obtain circulation and parameters with pumps at 575 GPM's-2170 PSI. 50 RPM's-8K TQ. Reciprocate drill string. 19:00 00:00 5.00 5,168 5,452 INTRM1 DRILL DDRL P Drill 8%"Hole f/5,168'to 5,452'MD -Noted Erratic/increased Torque on Back Ream @ 5,343'MD; Double Back Reamed Stand and Added Drill Zone to Mud to Increase Lubricity- Noted Appearance of Possible Shale Cavings at Bottoms Up-Made Preparations to Add Poroseal @ 3% VolNol ADT3.05 AST 0,ART 3.05 P/U 195,S/0 155, Rot 175 Torque On/Off 9.5/9 640 GPM @ 2500 Psi; ECD 10.82 WOB 9-15; RPM 110 Observed quarter sized shale cuttings on bottoms up. 05/20/2011 Drilled 8 3/4"hole w/1.3°fixed bend motor f/5452'to 6,803'MD 00:00 12:00 12.00 5,452 6,208 INTRM1 DRILL DDRL P Drilled 8 3/4"hole w/motor(1.3°fixed bend)f/5452'to 6208'Md 4725'TVD ADT-6.17 hrs.=ART-5.93 hrs. AST-.24 hrs. ECD-10.8 ppg Footage-756' WOB 12/15 k RPM 110 GPM 640 @ 2620 psi String wt. PU 203 SO 164 ROT 183 Torque on/off bmt.-10/9 k Page 9 of 49 Time Logs Date From To Dur S. Depth E. Depth Phase Code Subcode T Comment 12:00 15:00 3.00 6,208 6,397 INTRM1 DRILL DDRL P Drill 8'/4'Hole f/6,208'to 6,397'MD ADT2.03 AST 0.0,ART 2.03 P/U 207, S/O 165, Rot 185 Torque On/Off 10.5/9.5 640 GPM @ 2660 Psi; ECD 10.79 WOB 12-15; RPM 110 15:00 16:00 1.00 6,397 6,397 INTRM1 RIGMNTSVRG P Service Rig 16:00 00:00 8.00 6,397 6,803 INTRM1 DRILL DDRL P Drill 8'/4'Hole f/6,397'to 6,803'MD -Began Increasing MW t/10.0 PPG in Response to Shale Caving Analysis-Maintaining Poroseal at 3%Vol/Vol ADT4.55 AST 0.2,ART 4.35 P/U 212, S/0 167, Rot 187 Torque On/Off 12/10 640 GPM @ 2620 Psi; ECD 10.89 WOB 10-15; RPM 110 05/21/2011 Drilled 8 3/4"hole w/motor(1.3°fixed bend)f/6803'to 8241'MD 00:00 12:00 12.00 6,803 7,532 INTRM1 DRILL DDRL P Drilled 8 3/4"holw w/motor(1.3°fixed bend)f/6803'to 7532'MD 5437'TVD ADT-8.2 hrs.=ART-8.02 AST-.18 ECD-11.23 ppg Footage-729' WOB 12/15 k RPM 110 GPM 625 @ 2890 psi String wt. PU 225 SO 173 ROT 197 Torque on/off btm.-11.5/10.5 k 12:00 00:00 12.00 7,532 8,241 INTRM1 DRILL DDRL P Drill 8 3/4'Hole f/7,532'to 8,241'MD ADT 7.85 AST 0.0,ART 7.85 P/U 238,5/0 178, Rot 203 Torque On/Off 12.5/10.5 625 GPM @ 2990 Psi; ECD 11.18 WOB 10-15; RPM 110 05/22/2011 Drilled 8 3/4"hole w/motor f/8241'to 9,606'MD 00:00 12:00 12.00 8,241 8,944 INTRM1 DRILL DDRL P Drilled 8 3/4"hole w/motor(1.3° fixed bend)f/8241'to 8944'MD 6191'TVD ADT-8.13 hrs.=ART-7.43 hrs AST-.7 hrs ECD-11.28 ppg Footage -703' WOB 12/15 k RPM 110 GPM 625 @ 3180 psi String wt. PU 252 SO 180 ROT 209 _Torque on/off btm.-13/12 k 12:00 00:00 12.00 8,944 9,606 INTRM1 DRILL DDRL P Drill 8'/4'Hole f/8,944'to 9,606'MD ADT 7.49 AST 2.14,ART 5.35 P/U 270, S/O 183, Rot 218 Torque On/Off 14/13.5 625 GPM @ 3190 Psi; ECD 11.25 WOB 12-15; RPM 110 Page 10 of 49 Time Logs Date From To Dur S. Depth E. Depth Phase Code Subcode T Comment 05/23/2011 24 hr Summary Continue to Drill f/9,606'to 9,700'MD-OWFF-CBU X5 While Increasing MW t/10.5 PPG-OWFF-POOH on Elevators U 4,979'MD(Tight Spots @ 6,495', 5,474'and 5,427'MD)-CBU X2(Hole Unloaded)-OWFF- RIH U 9,605'MD(Took Weight @ 5,474'and 5,814'MD)**5,474'MD Duplicated In/Out)-Wash U 9,700 and Circulate While Increasing MW U 11.0 PPG-Continue to Drill f/9,700'to 10,040'MD 00:00 01:15 1.25 9,606 9,700 INTRM1 DRILL DDRL P Drill 8%"Hole f/9,606'to 9,700'MD ADT 1.03 AST 0.39 ART 0.67 P/U 275,S/O 183, Rot 220 Torque On/Off 15/13.5 WOB 11-15, RPM 110 625 GPM @ 2,810 Psi; ECD 11.19 01:15 04:45 3.50 9,700 9,416 INTRM1 DRILL CIRC P OWFF(Static)-CBU X5;610 GPM @ 2760 Psi, First 4 Bu @ 80 RPM and Final BU @ 100 RPM-Stand Back 1 Stand Every Oterh BU U 9,416'MD 04:45 05:00 0.25 9,416 9,416 INTRM1 DRILL OWFF P Orient Motor to High Side-Take SPR's-OWFF(Static) 05:00 10:45 5.75 9,416 4,979 INTRM1 DRILL WPRT P Wiper trip f/9416 to 4979'-pulled on TT-worked through tight spots @ 6995'-5474'&5427'-pulled 25 k over 10:45 11:45 1.00 4,979 4,979 INTRM1 DRILL CIRC P Circ 2 X btms up @ 610 gpm @ 2240 psi w/100 rpm's-8.5 k torque- ECD 11.44 ppg Observed large amount of cuttings after 1 st btms up-shakers began to clean up after 2nd btms up 11:45 12:00 0.25 4,979 4,979 INTRM1 DRILL OWFF P Blow down TD-Flow ck-well static 12:00 14:45 2.75 4,979 9,605 INTRM1 DRILL WPRT P RIH f/4979'to 9,605'MD; Set Down 25K at 5,474'and 5,814'MD, Worked Through w/o Pumps 14:45 17:15 2.50 9,605 9,700 INTRM1 DRILL CIRC P Wash Down U 9,700'MD-Ciculate to Complete Weight up U 11.0 PPG- 600 GPM @ 2800 Psi w/70 RPM 17:15 00:00 6.75 9,700 10,040 INTRM1 DRILL DDRL P Continue to Drill 8%"Hole 1/9,700' to 10,040 ADT 4.15,AST 1.58,ART 2.57 P/U 283, S/O 183, Rot 221 Torque On/Off 15/13.5 WOB 12-15, RPM 110 600 GPM @ 3370 Psi; ECD 12.08 05/24/2011 Continue to Drill 8%"Hole f/10,040'to 11,307'MD-Drag Data Became Erratic; Double Back Reamad Stand @11,307'MD 00:00 12:00 12.00 10,040 10,696 INTRM1 DRILL DDRL P Drill 8'/;'Hole f/10,040'to 10,696' MD ADT 7.29,ART 5.3,AST 1.99 P/U 300,S/O 228, Rot 185 RPM 110 WOB 11-15 600 GPM @ 3530 Psi; ECD 12.09 Torque On/Off 15/13.5 Page 11 of 49 Time Logs Date From To Dur S. Depth E. Depth Phase Code Subcode T Comment 12:00 00:00 12.00 10,696 11,307 INTRM1 DRILL DDRL P Drill 8 3/4"Hole f/10,696'to 11,307' MD ADT 7.33,ART 2.74,AST 4.59 P/U 335, S/O 150, Rot 277 600 GPM @ 3070 Psi; ECD 11.85 RPM 120,WOB 10-30 Torque On/Off 16/15 Double Back Reamed Connection @ 11,307'MD Due to 30K Increase In P/U and 12K Decrease in S/0 05/25/2011 Continue to Drill 8 3/4'Hole f/11,307'to TD as per Geo @ 11703'MD'.TVD=7375'.Total ADT= 106.55 HRS. Total Jar HRS=254.16 HRS.Total AST=23.4 HRS.Total Rot Hrs-83.15 HRS.Circulate&condition mud while reciprocate&rotate drill string. Raise mud weight in stages to 11.5 PPG. Monitor well. Begin short trip observing 25-30 K overpulls to 11228'MD,with 50K. Repeat attempts to work through.Attempt to TIH back to bottom getting to 11645'MD.While working string observed packing off issues.Attempt to gain full circulation&rotation again staging back to 500 GPM's and 100 RPM's. Observed packing off issues not allowing us to continue to bottom. POOH with punmps at 3 BPM-380 PSI,with overpulls to 35K over upweight. Pull from 11600'-11295'MD. 00:00 09:30 9.50 11,307 11,703 INTRM1 DRILL DDRL P Continue to Drill 8 3/4'Hole f/11,307 to TD as Der GEO at 11703'MD ND=7375'. ADT 5.26,ART 4.08,AST 1.18 P/U 305,5/0 170, Rot 220 600 GPM @ 3070 Psi; ECD 12.09 RPM 110,WOB 10-12 Torque On/Off 17/18 09:30 15:30 6.00 11,703 11,703 INTRM1 DRILL CIRC P Circulate&condition mud,2 bottoms up,with pumps at 600 GPM's-3280 PSI. Pump a 55 BBL Low Visc-Low weight sweep,observing increase in cuttings across shakers.Continue circulating, increasing mud weight to 11.5 PPG in stages. Observed no fluid losses. Monitor well-static. 15:30 17:00 1.50 11,703 11,228 INTRM1 DRILL TRIP P Short trip from 11703'-11228'MD. Observed overpulls up to 25-30 K over.Work through each spot @ bit depths of 11530', 11502', 11366', 11238',and 11228'.At 11228, observed 50K straight pull over up weight,work drill string,with no success in continuing out of hole. 17:00 23:00 6.00 11,228 11,685 INTRM1 DRILL TRIP T Decision to run back to bottom and circulate.Trip back in hole tagging up @ 11285'. Make up top drive, wash down through tight spots back to 11645'MD. Observed continuous packing off issues, and never regaining full rotation or circulation, with repeated attempts working up to 100 RPM's and 500 GPM's. At 11685'establish circulation at 3 BPM -400 PSI. Page 12 of 49 Time Logs Date From To Dur S. Death E. Depth Phase Code Subcode T Comment 23:00 00:00 1.00 11,685 11,295 INTRM1 DRILL TRIP P POOH with no rotation and pumps at 3 BPM-400 PSI.to 11295'MD. Observed overpulls of 35K with max pull at 350K. 05/26/2011 Continue to POOH w/Pumps Working Packed Off&Tight Areas f/1Q,710 to 9,3_53'MD-_Established Circulation Numerous Times Only to Pack Off-Established Circulation at Drilling Rates Above the HRZ @ 9,853'MD-Stand Back V 9,731'MD While Circulating 5 Bottoms Up Volumes to Clean the Hole 00:00 12:00 12.00 11,431 10,720 INTRM1 DRILL TRIP P Continue to POOH w/Pumps f/ 11,431'to 10,720'MD;2 PBM @ 380 Psi-Hole Packed Off Several Times and Pulled Up to 50K Over Pull to Make Progress-Rotary Exacerbated the Problem While in the Lower Shales 12:00 20:30 8.50 10,720 9,853 INTRM1 DRILL TRIP P Continue to POOH V 10,720'to 9,853'MD;2 BPM @ 400 Psi- Establish Pumps and Rotary @ 10,583'MD,Staged Pumps Up V 10 BPM w/2230 Psi and 80 RPM(Hole Packed Off After 1 Hr While Working Pipe) 20:30 00:00 3.50 9,853 9,731 INTRM1 DRILL CIRC P Establish Circulation @ 9,853'MD- Stage Pumps Up to 13 BPM w/ 2,650 Psi w/80 RPM(Loss Rate 80-100 BPH)-Decreased Rate V 12.5 BPM and Rate Initially Dropped to 40 BPM, Later Dropping to 10-20 BPM-Circulated 5-6 Bottoms Up, Shakers Were Loaded Initially w/ Heavy Sand Sized Particles, Followed by Shale Particles(Mostly Smaller Broken Pieces and Some Slivers Approximately 1/2"by 1/8")- Shakers Cleaned Up-Able to Work Pipe Freely in Both Directions w/ Rotation and Circulation-Stand Back t/9,731'MD Lost 293 Bbls of Mud to Formation in Previous 24 Hours 05/27/2011 Continue to Circulate the Hole Clean While Standing Back t/9,542'MD-OWFF-POOH f/9,542'to 2,581' MD-OWFF-Slip and Cut Drill Line-POOH-UD BHA#1 -R/U and Test BOPE w/5"Test Joint AOGCC Inspector Bob Noble Waived Witnessing the Test- Due 10 June 2011 00:00 00:45 0.75 9,731 9,542 INTRM1 DRILL CIRC P Continue to Circulate the Hole Clean by Pumping 12%BPM @ 2480 Psi w/80 RPM-Continue to Stand Back V 9,542'MD 00:45 02:00 1.25 9,542 9,542 INTRM1 DRILL OWFF P OWFF 02:00 10:45 8.75 9,542 2,581 INTRM1 DRILL TRIP P POOH on TT f/9,542'to 2,581'MD; Work Through Tight Spots @ 4,875' to 4,860'and 4,821'MD 10:45 11:30 0.75 2,581 2,581 INTRM1 DRILL OWFF P OWFF(Breathing)Static in 40 Minutes 11:30 12:45 1.25 2,581 2,581 INTRM1 RIGMNT SLPC P PJSM;Slip and Cut Drill Line Page 13 of 49 Time Logs Date From To Dur S. Depth E. Depth Phase Code Subcode T Comment 12:45 14:00 1.25 2,581 114 INTRM1 DRILL TRIP P POOH f/2,581'to 114'MD 14:00 17:00 3.00 114 0 INTRM1 DRILL PULD P L/D BHA Per DD and MWD; Download MWD Recorded Data 17:00 17:30 0.50 0 0 INTRM1 DRILL RURD P Clean and Clear the Rig Floor 17:30 18:15 0.75 0 0 INTRM1 WHDBO BOPE P Pull Wear Ring-Set Test Plug and R/U to Test BOPE 18:15 18:30 0.25 0 0 INTRM1 WHDBO SFTY P PJSM on Testing BOPE 18:30 23:00 4.50 0 0 INTRM1 WHDBO BOPE P Test the Following BOPE Components w/5"Test Joint U SAP 250/3500 Psi as Follows: Choke Manifold Valves 1-16,4"DEMCO, �5� Upper and Lower Pipe Rams-Test V Annular Preventer w/5"Test Joint U 250/2500 Psi-Test Blinds, Auto/Man Kill&Choke Valves,TIW and Dart U 250/3500 Psi-Perform Accumulator Test-AOGCC v Inspector Bob Noble Waived Witnessing the Test 23:00 00:00 1.00 0 0 INTRM1 WHDBO BOPE P R/D BOPE Test Equipment-Blow Down Manifolds-Pull the Test Plug and Set the Bowl Protector-Crew Change 05/28/2011 M/U BHA#2 and RIH U 3,459'MD;Tagged Obstruction-Establish Circulation and Ream f/3,450'to 3,549' MD; Large Volume of Cuttings(Sand/Shale)Across Shakers-RIH U 4,178'MD;Tagged Obstruction-Ream f/4,178'to 4,292'MD-CBU X8; Large Volume of Cuttings Across Shakers-RIH f/4,292'to 4,415'MD; Tagged Obstruction-Reamed f/4,415'to 5,230'MD-CBU X4-POOH U 2,517'MD-CBU X2-RIH U 8,317' MD;Tagged Obstruction-CBU X2 While Reaming U 8,445'MD; Large Volume of Sand Sized Shale Across Shakers, Minor Pack Off on Up Stroke 00:00 02:15 2.25 0 176 INTRM1 DRILL PULD T MU BHA#2-Plug in and initialize tools 02:15 03:00 0.75 176 730 INTRM1 DRILL TRIP T RIH w/hwdp from 176'to 730' 03:00 03:30 0.50 730 730 INTRM1 DRILL DHEQ T Shallow test MWD tools-Bloe down top drive 03:30 05:30 2.00 730 3,459 INTRM1 DRILL TRIP T RIH w/5"drill pipe from 730',tagged obstructign at 3459'__ 05:30 07:00 1.50 3,459 3,549 INTRM1 DRILL REAM T Establish circulation and stage pumps up to 525 gpm/1900 psi/80 rpm @ 6.5k ft/lbs-PUW 145K SOW 135K Rot.Wt. 140K-Ream from 3450'to 3549'-large volume of__. cuttings back across shakers- shakers began cleaning up after 2X BU. 07:00 07:30 0.50 3,549 4,178 INTRM1 DRILL TRIP T RIH from 3549'to tight spot at 4178', set down 15K SOW 07:30 10:15 2.75 4,178 4,292 INTRM1 DRILL REAM T Stage pumps up to 600 gpm/2310 psi/80 rpm @ 8K ft/lbs-Washed and reamed down two stands to 4292'-observed heavy retuns of 1/4" to 1/2"chips of shale/sandstone? and sand thoughout 4 BU, cuttings across shaker reduced by 80%after 8 x BU Page 14 of 49 Time Logs Date From To Dur S. Depth E. Death Phase Code Subcode T Comment 10:15 10:30 0.25 4,292 4,415 INTRM1 DRILL TRIP T RIH from 4292'to tight spot @ 4415' -set down 20K-PUW 175K SOW 145K 10:30 14:45 4.25 4,415 5,230 INTRM1 DRILL REAM T Stage pumps up to 600 gpm/2200 psi/8o rpm @ 7.5K ft. lbs.-Wash and ream hole from 4385'to 5230'- observed-cuttings volume across shakers similar to volume observed while drilling-cuttings mostly 1/4"or less chips and sand-circulated 2 X BU @ 5230'followed by 40 bbl high vis sweep and 2 x BU-final load on shakers reduced by 80%of cuttings volume while reaming 14:45 17:00 2.25 5,230 2,517 INTRM1 DRILL WPRT T POOH f/5,230'to 2,517'MD 17:00 18:00 1.00 2,517 2,517 INTRM1 DRILL CIRC T CBU X2 @ 600 GPM w/2100 Psi and 80 RPM-Pumped Hi-Vis Sweep 18:00 22:00 4.00 2,517 8,317 INTRM1 DRILL TRIP T RIH f/2,517'to 8,317'MD-Took Weight(25K) 22:00 00:00 2.00 8,317 8,445 INTRM1 DRILL WASH T Wash&Ream_ f/8,317'to 8.445'MR.. -550 GPM w/2,480 Psi and 80 RPM -Worked Tight Hole-Slight Packing Off on Up Stroke-Cleared- Sand/Shale Coming Over the Shakers @ Bottoms Up-Allowed to Clean Up 05/29/2011 Continue to RIH f/8,445'to 9,478'MD-CBU X4 While RIH f/9,478'to 9,762'MD-Increase MW f/11.5 to 11.8 PPG;After 11.8 All the Way Around ECD Rose f/12.35 to 12.73 PPGE, Losses Increased to 30-40 BPH,Added LCM and Lowered the Pump Rate f/550 to 500 GPM w/Losses Still Averaging 40 BPH-Ream f/9,857'to 10,424'MD;Wash and Ream f/10,424'to 10,613'MD-Adjusted pump rate from 8 to 10 bpm/ 1170- 1880 psi to manage ECD below 12.5 ppg as losses increased as high as 100 bph above 12.5 ECD. Encountered pack off events(a) 10,490', 10,500'&10,525'-worked through tight spots @ 10,428', 10,464', 10,474', 10,516', 10,534-While back reaming last stand from 10,613'had a major packoff event-worked pipe up hole pulling 425K(125K over)established circulation after working pipe back down hole-Decision made to end clean out attempt-BROOH f/10,598'to 9,942'MD-CBU X2 While Pulling 2 Stands t/9,762'MD- POOH on TT f/9,762'to 5,609'MD Lost 448 Bbls of Mud to the Hole in the Previous 24 Hour Period 00:00 00:30 0.50 8,445 9,478 INTRM1 DRILL TRIP T RIH on Elevators f/8,445'to 9,478' MD-P/U 265, S/O 165 00:30 03:15 2.75 9,478 9,762 INTRM1 DRILL CIRC T CBU X4 @ 550 GPM w/2,720 Psi and 100 RPM-Wash/Ream In Hole Picking Up 1 Stand Every Other BU f/9,478'to 9,762'MD Page 15 of 49 Time Logs Date From To Dur S. Depth E. Depth Phase Code Subcode T Comment 03:15 06:45 3.50 9,762 9,857 INTRM1 DRILL CIRC T Circulate and Condition Mud Increasing Mud Weight from 11.5 PPG to 11.8 PPG; ECD Increased f/ 12.35 to 12.73 PPG-550 GPM @ 2600 Psi-PUW 265K SOW 165K - 100 rpm @ 12K ft/lbs 40 minutes after 11.8 ppg mud all the way around began lossing mud to hole @ 30-40 bph-began adding LCM to active system(5 ppb Dynared/2 ppb Nutplug fine) reduced circulating rate to 500 gpm/ 2330 psi-losses averaging—40 bph 06:45 11:30 4.75 9,857 10,360 INTRM1 DRILL REAM T Wash and ream hole from 9,857'to 10,424'-500 gpm/2330 psi/80 rpm @ 12K ft/lbs ECD @ 12.56 ppg Worked through tight spots @ 10,042', 10,191', 10,282'-hole packed off @ 10,363', 10,376', 10,360'-able to work free and establish circulation with moderate effort each event. Lossess averaged 40 bph.After reaming stand down to 10,424' losses increased to 100 bph. Reduced circulating rate to 8 bpm/ 1240 psi/ECD=12.42 ppg- Backream two stands to 10,235'tight spot @ 10,360'-losses—40 bph @ 12.42 ECD-Increased rate to 500 gpm/12.60 ppg ECD for evaluation observed losses increase to—100 bph. 11:30 12:45 1.25 10,360 10,424 INTRM1 DRILL REAM T Wash and ream from 10,360'to 10,424'@ 8 bpm/1240 psi/80 rpm -backreamed last stand without problems. 12:45 16:15 3.50 10,424 10,613 INTRM1 DRILL REAM T Wash and ream hole from 10,424'to 10,613'-Adjusted pump rate from 8 to 10 bpm/1170- 1880 psi to manage ECD below 12.5 ppg as losses increased as high as 100 bph above 12.5 ECD. Encountered pack off events @ 10,490', 10,500'& 10,525'-worked through tight spots @ 10,428', 10,464', 10,474', 10,516', 10,534-While backreaming last stand from 10,613'had a major packoff event-worked pipe up hole pulling 425K(125K over)established circulation after working pipe back down hole-Decision made to end clean out attempt. 16:15 18:30 2.25 10,613 9,942 INTRM1 DRILL REAM T BROOH f/10,598'to 9,942'MD;8 BPM w/1350 Psi and 80 RPM 18:30 20:00 1.50 9,942 9,762 INTRM1 DRILL CIRC T CBU X2 While Pulling 2 Stands t/ 9,762'MD @ 12.5 BPM w/2700 Psi 20:00 20:15 0.25 9,762 9,762 INTRM1 DRILL OWFF T OWFF-Blow Down Top Drive Page 16 of 49 Time Logs Date From To Dur S. Depth E. Depth Phase Code Subcode T Comment 20:15 00:00 3.75 9,762 5,609 INTRM1 DRILL TRIP T POOH on TT f/9,762'to 5,609'MD 05/30/2011 POOH f/5,609'to 4,947'MD-CBU X2-POOH f/4,947'to 2,706'MD-CBU X2-POOH t/729'MD-UD BHA #3-R/U and Test BOPE w/3'/z"Test Joint t/250/2500 and 250/3500 as Required-P/U 38 Jts of 3'/z'EUE Tubing and RIH on 5"DP U 9,846'MD-Circ and Condition Mud-RIH f/9,846'to 10,508'MD-Wash Down f/ 10,508'to 10,601'MD; String Took Weight and Packed Off Slightly;Took 50K OVer to Pull Free-POOH U 10,414'MD-Circ and Condition Mud-Pump 1st Isolation Plug f/10,414 to 9 714'MD(30% Excess Pumped) 00:00 00:15 0.25 5,609 4,947 INTRM1 DRILL TRIP T POOH f/5,609'to 4,947'MD 00:15 01:45 1.50 4,947 4,947 INTRM1 DRILL CIRC T CBU X2-Stage Pumps Up U 550 GPM w/80 RPM-Allowed Shakers to Clean Up 01:45 03:30 1.75 4,947 2,706 INTRM1 DRILL TRIP T OWFF(Static)-Blow Down the Top Drive-POOH f/4,758'to 2,706'MD 03:30 04:00 0.50 2,706 2,706 INTRM1 DRILL CIRC T CBU X2 @ 550 GPM @ 1,770 Psi w/ 80 RPM 04:00 06:00 2.00 2,706 729 INTRM1 DRILL TRIP T OWFF(Static)-POOH f/2,706'to 729'MD 06:00 07:45 1.75 729 0 INTRM1 DRILL TRIP T S/B HWDP&Collars-UD BHA#3 07:45 08:30 0.75 0 0 INTRM1 DRILL RURD T Clean and Clear the Rig Floor 08:30 09:00 0.50 0 0 INTRM1 WHDBO BOPE P R/U to Test BOPE 09:00 10:00 1.00 0 0 INTRM1 WHDBO BOPE P Test BOPE w/3'/2'Test Joint as Follows:Test Upper, Lower Rams U 250/3500 Psi-Test Annular to 250/2500 Psi 10:00 10:45 0.75 0 0 INTRM1 WHDBO BOPE P R/D BOPE Test Equipment 10:45 11:00 0.25 0 0 INTRM1 DRILL RURD T R/U to Run 3'A"Tubina 11:00 12:30 1.50 0 1,192 INTRM1 CEMEN-PUTB T Run 3'/z'Cement String U 1,192'MD 12:30 13:00 0.50 1,192 1,192 INTRM1 CEMEN'RURD T M/U XO's-R/U to Handle 5"DP 13:00 18:00 5.00 1,192 9,846 INTRM1 CEMEN-TRIPT RIH w/Cement String on 5"DP f/ 1,192'to 9,846'MD 18:00 19:30 1.50 9,846 9,846 INTRM1 CEMEN"CIRC T Circ and Condition Mud Stage Pumps Up U 8 BPM w/820 Psi 19:30 20:00 0.50 9,846 10,508 INTRM1 CEMEN-TRIPT RIH f/9,846'to 10,508'MD-P/U 245, SIO 160 20:00 21:00 1.00 10,508 10,414 INTRM1 CEMEN"WASH T Wash f/10,508'to 10,601'MD-8 BPM w/820 Psi-String Took Weight and Pressure Increased U 930 Psi-Attempt to P/U and had to Pull 50K Over P/U to Free Pipe-S/B 1 Stand to 11,508'and Attempt to Work Pipe-Taking Weight on Down Stroke @ 11,475'MD Unable to Work Past-Pulled 1 Stand U 10,414'MD 21:00 22:00 1.00 10,414 10,414 INTRM1 CEMEN"CIRC T Circ and Condition Hole While Working Pipe @ 6 BPM-SIMOPS: PJSM for Cement Plug Page 17 of 49 • Time Logs Date From To Dur S. Depth E. Depth Phase Code Subcode T Comment 22:00 00:00 2.00 10,414 10,414 INTRM1 CEMEN"PLUG T Pump 1st Cement Plug as Follows: Pump 2 Bbls Water,Test Lines, Pump 20 Bbls of 12.5 PPG Mud C ` 1 Push @ 4.3 BPM w/396 Psi,67 Bbls of 15.8 PPG Cement @ 5.3 BPM w/350 180 Psi and 3.5 Bbls of 411 12.5 PPG Mud Push @ 6.2 BPM w/ �`{ 167 Psi-Displace Cement w/153 `D Bbls of 11.7 PPG Mud @ 6.2 BPM w/370 Psi; Lift PRessure 720 Psi @ 6.2 BPM-Lost 5 Bbls of Mud During Cement Job-CIP 2315 ETOC w/ 30%excess=9721' 05/31/2011 POOH to 9721'-Load&pump wiper ball to clear pipe-RU cmt line-Set plug P&A plug#2 w/338 sks(70 bbls) 15.8 ppg-displaced to equlize-POOH to 9000'-Load&pumped wiper ball to clear pipe-RU cmt line- set P&A plug#3 w/349 sks(72 bbls) 15.8 ppg-Displaced to equlize-POOH to 7868'-Load&pump wiper ball to clear pipe-POOH-LD 3 1/2"cmt stinger-MU BHA#3-RIH to 7810'- Establish circ-pumped hi-vis sweep @ 500 GPM @ 1600 PSI W/80 RPM'S 00:00 00:45 0.75 10,414 9,721 INTRM1 CEMEN-TRIPT R/D Cement Lines-POOH f/10,414' to 9,721'MD P/U 235, S/O 175 00:45 01:30 0.75 9,721 9,721 INTRM1 CEMEN-CIRC T Load DP Wiper and Circulate Until Wiper Clears String-6 BPM @ 520 Psi w/20 RPM 01:30 02:45 1.25 9,721 9,721 INTRM1 CEMEN-CMNT T Pump 2nd Cement Pug as Follows:_ Pump 2 Bbls Water,Test Lines, Pump 20 Bbls of 12.5 PPG Mud Push @ 4.3 BPM w/360 Psi, 70 Bbls of 15.8 PPG Cement @ 5.4 BPM w/300 Psi and 3.5 Bbls of 12.5 P PPG Mud Push @ 6.2 BPM w/190 Psi-Displace Cement w/140 Bbls of c1Ep 11.7 PPG Mud @ 6.2 BPM w/400 Psi; Lift PRessure 740Psi @ 6.2 BPM-Full returns throughout job- CIP 0240 ETOC w/30%excess= 9001' 02:45 03:45 1.00 9,721 9,001 INTRM1 CEMEN-TRIPT R/D Cement Lines-POOH from 9,721'to 9001' PUW 230K SOW 165K 03:45 04:30 0.75 9,001 9,001 INTRM1 CEMEN-CIRC T Load DP Wiper and Circulate Until Wiper Clears String-6 BPM @ 520 Psi w/20 RPM 04:30 05:45 1.25 9,001 9,001 INTRM1 CEMEN-CMNT T Pump 3nd Cement Plug as Follows:. Pump 2 Bbls Water,Test Lines to 3000 psi, Dowell Pumped 20 Bbls of *3 12.5 PPG Mud Push ,72 Bbls of 15.8 PPG Cement and 3.5 Bbls of 12.5 PPG Mud Push-Rig displaced clV) to equalization with 127 Bbls of 11.7 PPG Mud @ 6 BPM w/500 Psi; FCP 700 Psi -lost-5 bbls of mud throughout the job-CIP 0535- ETOC w/30%excess=8257' Page 18 of 49 Time Logs Date From To Dur S. Depth E. Depth Phase Code Subcode T Comment 05:45 07:15 1.50 9,001 7,868 INTRM1 CEMEN-TRIPT R/D Cement Lines-POOH from 9,001'to 7868' PUW 220K SOW 160K 07:15 09:00 1.75 7,868 7,868 INTRM1 CEMEN"CMNT T Load DP Wiper-Stage pumps up to 8 BPM @ 760 Psi/20 RPM- . circulate and condition mud 09:00 13:15 4.25 7,868 1,192 INTRM1 CEMEN"TRIP T Flow check well,static-Blow down TD-POOH on TT f/7868'to 7395'- Flow ck.well static-Pumped dry job -Blow down TD-POOH on TT f/ 7395'to 1192' 13:15 15:45 2.50 1,192 0 INTRM1 CEMEN-PULD T PJSM-RU and lay down 38 joints of 3 1/2"tubing 15:45 16:45 1.00 0 0 INTRM1 CEMEN"PULD T Clean&clear rig floor of tongs& other excess equipment 16:45 18:00 1.25 0 661 INTRM1 DRILL PULD T MU BHA#3(bit-BS-stab-NM flex DC-G. Reamer-2 NM flex DC's -3 HWDP-jars-14 HWDP) 18:00 23:00 5.00 661 7,810 INTRM1 DRILL TRIP T RIH w/BHA#3 on 5"DP f/661'to 7810'(filling DP every 20 stds) 23:00 00:00 1.00 7,810 7,810 INTRM1 DRILL CIRC T Establish circ-Pumped hi vis sweep @ 500 gpm @ 1600 psi w/80 rpm's- Pumped hi-vis sweep&circ sweep around 06/01/2011 Cont.circulating hi-vis sweep-Wash down f/7810'-Tagged top of cmt plug#3 @ 8357'-POOH to 6486'- Circ btms up-POOH on TT f/6486'to 661'-handle BHA-MU ECP&PU 30 jts 3 1/2"tbg-RIH to 6097'- Set ECP w/top @ 6068'-Release f/ECP- Pick up to 6065'-Set KOP w/34 bbls 17.0 ppq cmt w/calc top @ 5610'-POOH 1s 5557'.:Pump wiper ball through drill string&circ btms up-Flow ck-Pump dry job 00:00 00:15 0.25 7,810 7,810 INTRM1 DRILL CIRC T Cont.to circ hi-vis sweep out of hole @ 600 gpm @ 1550 psi w/80 rpm's 12 k torque Observed sweep back @ shakers 1025 stks past calc. -Observed no large shale cuttings only fine cuttings 00:15 01:30 1.25 7,810 8,357 INTRM1 DRILL WASH T Washed down f/7810'&tagged top_ of plug#3 @ 8357'(talc top was 8257')@ 4 bbls/min @ 400 psi-Set 15 to 20 k on plug 01:30 03:30 2.00 8,357 6,486 INTRM1 DRILL TRIP T POOH f/8357'to 8282'-Flow ck. static-Blow down TD-POOH on TT f/8282'to 6486' 03:30 05:00 1.50 6,486 6,486 INTRM1 DRILL CIRC T Circ btms up @ 500 gpm @ 1560 psi w/80 rpm's 11 k torque Observed large amount of fine cuttings at btms up-circ to clean up 05:00 08:30 3.50 6,486 2,449 INTRM1 DRILL TRIP T Flow ck. static-Pumped job job- blow down TD-POOH on TT f/6486' to 2449'-PU wt.210 So wt. 150 08:30 09:45 1.25 2,449 661 INTRM1 DRILL TRIP T Flow ck. static-Cont.to POOH on TT f/2449'to 661' 09:45 10:30 0.75 661 0 INTRM1 DRILL PULD T Flow ck static-std back HWDP& NM flex DC's-LD remaining BHA 10:30 11:00 0.50 0 0 INTRM1 DRILL PULD T Clean up rig floor&clear floor of excess tools Page 19 of 49 Time Logs Date From To Dur S. Depth E. Depth Phase Code Subcode T Comment 11:00 11:15 0.25 0 0 INTRM1 CEMEN"SFTY T PJSM on making up Baker ECP& picking up 3 1/2"tbg 11:15 13:15 2.00 0 961 INTRM1 CEMEN"PULD T RU tongs-MU Baker PayZone ECP w/P&A kit-PU&RIH WI 30 Its 3_ 1/2"tbg to 961' 13:15 14:00 0.75 961 961 INTRM1 CEMEN-RURD T RD tbg tongs and change elevators 14:00 18:15 4.25 961 6,097 INTRM1 CEMEN-TRIP T RIH w/ECP f/961'to 6097'(filling DP every 20 stds) 18:15 19:45 1.50 6,097 6,065 INTRM1 CEMEN-PACK T Establish circ&stage pump up to 6 bbls/min @ 520 psi-Circ DP volume -Insert DP wiper plug in drill pipe- Pump plug down to top of ECP- Latched into lower wiper plug& pump to land out on landing collar- Stage up pressure f/1700 psi to 2200 psi-observed packer inflation calc.1/2 bbl to inflate ECP)Pressure up to 2980 psi to release f/ECP- Btm of packer @ 6097'top of packer_ A-6-068'-__pu wt. 180 SO wt. 140-- Pull up to 6065'-Break out 1 single DP&set in mouse hole-RU cement equipment-Stage pump up to 6 bbls/min @ 580 psi&circ btms up 19:45 21:30 1.75 6,065 6,065 INTRM1 CEMEN"CMNT T PJSM on setting kick-off plug-Set kick-off plug as follows:w/cmt stringer set @ 6065'-Pumped 2 bbls water-Tested lines to 3000 psi- Mixed&pumped 20 bbls 12.5 ppg MudPush-Mixed&pumped 34 bbls (190 sks) 17.0 ppg Class G cmt- Pumped 3.5 bbls-12.5 ppg MudPush-Switched over to rig pumps&displaced cement w/87 bbls 11.5 ppg KLA-SHIELD mud @ 6 bbls/min-final pressure 900 psi- full circ through job-CIP @ 2130 hrs.-RD cmt equipment 21:30 22:15 0.75 6,065 5,557 INTRM1 CEMEN-TRIP T POOH f/6065'to 5557' 22:15 00:00 1.75 5,557 5,557 INTRM1 CEMEN"CIRC T Insert wiper ball into DP&Circ pipe vloume to clear ball through DP&tbg stinger-Circ btms up @ 12 bbls/min @1070 psi f;i 06/02/2011 Finish POOH-LD tbg stinger&Baker ECP setting tool-MU BHA#4&RIH to 776'-Shallow pulse tools- RIH to 2727'-SLIP&Cut Drill line-RIH to 5617'-Wash&ream f/5617'to 5712'(tagged up on cmt pluq)_ CO cmt to 5767'-Begin to side track-off plug @ 5776'-Drilled to 5801'-Motor stalled-PU Observed over pull&set off jars-Circ&change over well over to 11.0 ppg LSND mud-Cont. Drilling 8 3/4"hole w/motor f/ 5801'to 6054' 00:00 01:45 1.75 5,557 961 INTRM1 CEMEN"TRIP T POOH on elevators from 5557'to 961'-Flow check well, static 01:45 02:15 0.50 961 961 INTRM1 CEMEN-RURD T PJSM-RU to lay down 3 1/2"tubing 02:15 04:00 1.75 961 0 INTRM1 CEMEN"PULD T Lay down 30 joints of 3 1/2"tubing 01'‘' and Packer running tools-RD tubing tongs-Clean work area on rig floor Page 20 of 49 Time Logs Date From To Dur S: Depth E. Depth Phase Code Subcode T Comment 04:00 06:45 2.75 0 96 INTRM1 DRILL PULD T MU Drilling BHA#4-Plug in and initialise MWD Tools 06:45 07:30 0.75 96 776 INTRM1 DRILL TRIP T RIH w/Flex collars and hwdp to 776' shallow test MWD tools 07:30 09:30 2.00 776 2,527 INTRM1 DRILL TRIP T Pick up 27 jts.of 5"drill pipe from shed and RIH to 2,527' 09:30 10:45 1.25 2,527 2,527 INTRM1 RIGMNT SLPC T PJSM-Slip and cut drilling line- _Service Top Drive and Drawworks 10:45 13:00 2.25 2,527 5,617 INTRM1 DRILL TRIP T RIH from 2,527'to 5617'-fill pipe every 20 stands 13:00 13:30 0.50 5,617 5,767 INTRM1 DRILL REAM T Wash and ream from 5,617 to tagged cement top @ 5712',cleaned out cement to 5767'-500 gpm/1900 psi /80 rpm @ 11K ft./lbs 13:30 15:15 1.75 5,767 5,801 INTRM1 DRILL DDRL T Orient motor to 160 left-Control drill to sidetrack well from 5,767'to motor stalled picked up to 280 k to free pipe-PUW 200K SOW 145K Rot,WT 170K 600 gpm 2380 psi Off of cmt plug @ 5767' 15:15 18:15 3.00 5,801 5,801 INTRM1 DRILL CIRC T PJSM-Pumped 35 bbls high vis sweep-displace hole to 11.0 ppg new LSND mud-Circulate and condition mud-500 gpm/2340 psi/ 80 rpm @ 11K ft.Ibs. 18:15 00:00 5.75 5,801 6,054 INTRM1 DRILL DDRL T Drilled 8 3/4"hole w/motor f/5801' to 6054'MD 4653'TVD ADT-3.4 hrs.=ART-1.8 hrs AST- 1.6 hrs ECD- 11.63 ppg Footage-278' WOB 10/12 k RPM 80 GPM 550 @ 1700 psi String wt PU 198 SO 154 ROT 175 Torque on/off btm.-10.5/10 k ft/lbs. 06/03/2011 Drilled 8 3/4"hole w/motor f/6054'to 6183'-Circ 2 X btms up-Made wiper trip back to 9 5/8"csg shoe(to evaluate upper clays after changing over mud system to LSND)-Circ btms up-RIH to 6088'-Wash down to 6183'(precautionary)-Drilled 8 3/4"hole w/motor f/6183'to 7223' 00:00 02:00 2.00 6,054 6,183 INTRM1 DRILL DDRL T Drilled 8 3/4"hole w/motor f/6054' to 6183'MD 4653'TVD ADT-1.37 hrs.=ART-1.05 hrs AST- 0.32 hrs ECD-11.63 ppg Footage-129' WOB 10/15 k RPM 80/100 GPM 600 @ 2140 psi String wt PU 195 SO 163 ROT 179 Torque on/off btm.-11 /10.5 k ft/lbs. 02:00 03:00 1.00 6,183 6,183 INTRM1 DRILL CIRC T Circulate 2 X BU-600 gpm/1950 psi/60 rpm @ 10K ft./lbs.-Flow check well, static Page 21 of 49 Time Logs Date From To Dur S. Depth E. Depth Phase Code Subcode T Comment 03:00 06:45 3.75 6,183 2,527 INTRM1 DRILL TRIP T Precautionary wiper trip to evaluate shallow clays after swapping mud systems to LSND mud POOH from 6183'to 2527'-wiped tight spots at 5484'&5294', no other problems 06:45 07:15 0.50 2,527 2,527 INTRM1 DRILL CIRC T Circulate BU-600 gpm/1600 psi/ 60 rpm @ 8.5K ft./lbs. Rot. up WT. 144K / Rot.dn.Wt. 140K Slight amount of cuttings over shaker -no indication of instability 07:15 09:30 2.25 2,527 6,183 INTRM1 DRILL TRIP T Flow check well,static-RIH from 2621'to 66183'-precautionary wash P rY and ream last stand to bottom-600 gpm/1970 psi/80 rpm @ 8.5K ft/lbs. PUW 185K SOW 150K 09:30 12:00 2.50 6,183 6,318 INTRM1 DRILL DDRL T Drilled 8 3/4"hole w/motor f/6183' to 6318'MD 4794'TVD ADT-1.46 hrs. =ART-.50 hrs. AST-.96 hrs. ECD-11.73 ppg Footage-135' WOB 10/15 k RPM 80 GPM 600 @ 2160 psi String wt. PU 195 SO 163 ROT 179 Torque on/off btm.-11/10.5 k 12:00 00:00 12.00 6,318 7,223 INTRM1 DRILL DDRL T Drilled 8 3/4"hole w/motor f/6318' to 7223'MD-5240'TVD ADT-7.15 hrs=ART-4.13 hrs. AST-3.02 hrs. ECD-11.99 ppg Footage-905' 126.6'/hr.average) WOB 5/18 k RPM 100 GPM 600 @ 2520 psi String wt. PU 205 SO 168 ROT 188 Torque on/off btm.-11.5/11 k 06/04/2011 Drilled 8 3/4"hole w/motor f/7223'to 8989' 00:00 12:00 12.00 7,223 8,093 INTRM1 DRILL DDRL T Drilled 8 3/4"hole w/motor f/7223' to 8093'MD-5612'TVD ADT-5.96 hrs=ART-5.08 hrs. AST-0.88 hrs. ECD-11.98 ppg Footage-870' 146'/hr.average) WOB 20/25 k RPM 100 GPM 600 @ 2800 psi String wt. PU 220 SO 172 ROT 193 Torque on/off btm.-13.5/13.5 k Backreamed through tight spots @ 7884', 7979'&8074' Page 22 of 49 Time Logs Date From To Dur S. Depth E. Depth Phase Code Subcode T Comment 12:00 00:00 12.00 8,093 8,989 INTRM1 DRILL DDRL T Drilled 8 3/4"hole w/motor f/8093' to 8989'MD-5984'TVD ADT-6.79 hrs. =ART-5.58 hrs AST-1,21 hrs ECD-12.20 ppg Footage-896' (132'/hr.average) WOB 10/20 k RPM 100 GPM 600 @3100 psi String wt. PU 230 SO 180 ROT 204 Torque on/off btm.-13.5/12 k 06/05/2011 Drilled 8 3/4"hole w/motor f/8989'to 10,719' 00:00 12:00 12.00 8,989 9,870 INTRM1 DRILL DDRL T Drilled 8 3/4"hole w/motor f/8989' to 9870'MD-6356'TVD ADT-7.44 hrs. =ART-6.53 hrs AST-0.91 hrs ECD-11.98 ppg Footage-881' (118'/hr. average) WOB 10/20 k RPM 100 GPM 615 @ 3110 psi String wt. PU 250 SO 185 ROT 210 Torque on/off btm.-16/14 k Rig pick top of Nanuq-9490' Base- 9770' 12:00 00:00 12.00 9,870 10,719 INTRM1 DRILL DDRL T Drilled 8 3/4"hole w/motor f/9870' to 10,719'MD 6731'TVD ADT-7.24 hrs.=ART-4.43 hrs AST- 2.81 hrs ECD-12.01 ppg Footage-849' (117.3'/hr average) WOB 5/20 k RPM 100 GPM 600 to 575 @ 3120 to 2970 psi String wt. PU 260 SO 185 ROT 216 Torque on/off btm,-16.6/15 k ***NOTE-Hole started taking fluid @ 10,485'-Drilled hard spot @ 10,494' Inital loss rate @ 44 bbls/hr-began adding Dynared fine to active system Well began breathing on connection @ 10,529'-Connection @ 10,624' well static Losses slowed to<10 bbls/hr by 10,719' 06/06/2011 Circ 2 1/2 X btms up for wiper trip(stood back 3 stds DP)-Made wiper trip f/10,434'to 6372'(worked tight spot @ 9682') -Circ 2 X btms up-backing reaming to 6103'-RIH to 10,529'-Wash down to 10,719'-Circ& cond. mud-Made 760 bbls whole mud dilution w/Glydril w/shale stablization(Soltex-Sack Black- Resinex)-Stood back DP to 10,434'-RIH to 10,624'-Washed down f/10,624'to 10,719'-Drilled 8 3/4"hole f/10,719'to 11,288' Page 23 of 49 Time Logs Date From To Dur S. Depth E. Depth Phase Code Subcode T Comment 00:00 02:30 2.50 10,719 10,434 INTRM1 DRILL CIRC T Circ 2.5 X btms up @ 550 gpm @ 2190 psi w/60 rpm's-14.5 k torque Pumped LCM pill-Stood back 3 stds drill pipe to 10,434'while circulating 02:30 08:30 6.00 10,434 6,183 INTRM1 DRILL WPRT T Blow down TD-Flow ck well static- POOH on elevators f/10,434'to 6372'-wiped tight spot clean @ 9682'(max over 30K) Backream two stands to 6183'-1st stand 550 gpm/1870 psi 80 rpm @ 9K ft./lbs.torque initial ECD 11.57 ppg 2nd stand 600 gpm/2160 psi/80 rpm @ 9K ft./lbs.torque PUW 205K SOW 160K Rot. 175K final ECD 11.52 ppg Slight amount of fine solids back across shakers-flow check well, static 08:30 11:15 2.75 6,183 10,529 INTRM1 DRILL WPRT T RIH from 6183'to 10,529'-no problems-PUW 240K SOW 170K 11:15 12:45 1.50 10,529 10,719 INTRM1 DRILL CIRC T Establish circulation-staged pumps up to 550 gpm/2590 psi/60 rpm @ 14.5K ft./lbs torque-pumped 40 bbl high vis sweep-precautioary ream from 10,529'to 10,719' Initial ECD= 12.08 ppg final ECD=11.8 ppg 12:45 14:45 2.00 10,719 10,719 INTRM1 DRILL CIRC T Set back 1 stand to 10,624'. Circulate and condition mud- pumped 760 bbls of whole mud dilution with Glydrill-added shale stabalizers to mud system- condition mud to 11.0 ppg in and out -550 gpm/2340 psi/80 rpm @ 14.5K ft.lbs.-PUW 225K SOW 170K Rot.Wt. 208K Stood back one stand/30 minutes Final ECD=11.9 ppg RIH from 10434'to 10,719'-precautionary ream last stand to bottom. 14:45 00:00 9.25 10,719 11,288 INTRM1 DRILL DDRL T Drilled 8 3/4"hole w/motor f/10,719' to 11,288'MD 6982'TVD ADT-4.92 hrs.=ART-3.02 hrs. AST- 1.90 hrs. ECD-12.17 ppg Footage-569' (115.7'/hr average) WOB- 5/20 k RPM 100 GPM 600 @ 3380 psi String wt. PU 266 SO 186 ROT 220 Torque on/off btm.-16/14 k Rig pick top of HRZ-10,930' Base- 11,160' Page 24 of 49 Time Logs Date From To Dur S. Depth E. Death Phase Code Subcode T Comment 06/07/2011 24 hr Summary Drilled 8 3/4; hole w/motor f/11,288'to 12,263'. Circulate,then wiper trip to 10624', circulate while working pipe to 10529'. 00:00 12:00 12.00 11,288 12,044 INTRM1 DRILL DDRL T Drilled 8 3/4"hole w/motor f/11,288' to 12,044'MD 7308'TVD ADT-7.13 hrs=ART-4.67 hrs AST- 2.46 hrs ECD-12.1 ppg Footage-756' (106'/hr) WOB 15/20 RPM 100 GPM 600 @ 3350 psi String wt PU 285 SO 175 ROT 220 Torque on/off btm.-18.15.5 k Top HRZ- 10,805' Base HRZ-11,172' K-1 marker-11,311' Kup C-11,493' LCU-11,497' ,p 12:00 15:30 3.50 12,044 12,263 INTRM1 DRILL DDRL T Drilled 8 3/4"hole w/motor f/12044' to 12,263'MD 7397'TVD ADT-2.14 hrs, ART-.69 hrs, AST- 1.45 hrs ECD-12.1 ppg Footage-219' (102'/hr) WOB 15/20 RPM 100 GPM 600 @ 3350 to 3390 psi String wt PU 285 SO 175 ROT 220 Torque on/off btm.-18k/15.5 k 1/ Top Alp C-12,157' Top UJU(Alp B)-12,164' 15:30 19:15 3.75 12,263 12,263 INTRM1 DRILL CIRC T Obtain final survey @ 12262'.Obtain slow pump rates. Pump a hi vis sweep,then circulate to clean hole 4 BU. Reciprocate f/12263'to 12203'. Rotae 80 rpm w/16k ft lbs of torque. Pumping 600 gpm w/3390 psi,w/ final 11.74 ppg ECD's. 19:15 19:30 0.25 12,263 12,263 INTRM1 DRILL OWFF T Pre job safety meeting. Observe well for flow-slight loss. 19:30 23:00 3.50 12,263 10,624 INTRM1 DRILL WPRT T Pull out of the hole on elevators f/ 11263'to 10624'. Monitor well on the trip tank.Calculated displacement 13.4 bbls, actual 22.5 bbls. Wiped the following tight spots(PU wt's of 300 to 320k)with normal drag afterwards: 11602', 11522', 11507', 11474', 11430', 11411', 11383', 11342', 11237', 11214', 11060'and 11030'. 23:00 00:00 1.00 10,624 10,529 INTRM1 DRILL CIRC T Circulate w/600 gpm and 2730 psi. Rotate 80 rpm w/16k ft lbs of torque. Work pipe f/10624'to 10529°. Page 25 of 49 Time Logs Date From To Dur S. Depth E. Depth Phase Code Subcode T Comment 06/08/2011 24 hr Summary Circulate, monitor well-static, RIH to 11549',wash to 11572', RIH to 11821',wash 11818'to 11855', RIH to 11895',wash 11855'-12262',CBU,wt up f/11 ppg to 11.5 ppg, , monitor well-static,attempt to POOH,circ, wiper trip w/pumps f/12263'to 11477',attempt to POOH w/o pumps-no go. RIH f/11477'to 12193',wash 12193'to 12263',CBU,spot casing running pill to bit, pump out leaving casing running pill in open hole f/ 12263'to 10624', POOH on elevators f/10624'to 5913',tight @ 5913', RIH to 5994', Pumped out to 5899'@ midnight. 00:00 01:45 1.75 10,529 10,315 INTRM1 DRILL CIRC T Circ 2 X btms up @ 10,529'-w/600 gpm @ 2830 psi w/80 rpm's 16 k torque-Standing back 1 std DP every 45 mins.to 10,315' 01:45 03:30 1.75 10,315 11,549 INTRM1 DRILL TRIP T Flow ck(static)RIH f/10,315'to 11,549'-PU wt 285 SO wt. 175- tight spots @ 11,239', 11,249', 11,510', 11,514', 11,537', 11543',11,549').Wipe out tight spots w/normal SO wt after(170-175k). 03:30 04:00 0.50 11,549 11,572 INTRM1 DRILL WASH T Unable to work past 11,549'-PU to 11,475'-Wash down f/11,475'to 11,572'-w/300 gpm @ 1150 psi w/ 80 rpm's @ 17 k torque 04:00 04:45 0.75 11,572 11,821 INTRM1 DRILL TRIP T RIH f/11,572'to 11,821'(tight spots @ 11,672', 11,790', 11,805, 11,809', 11,814', 11,821'. SO wt 175 to 170k. 04:45 05:30 0.75 11,821 11,855 INTRM1 DRILL WASH T Unable to work past 11,821'-PU& wash down f/11,818'to 11,855-300 gpm @1170psi w/80 rpm @16.5k torque. Incrtease pump rate to 350 gpm w/1350 psi,then up to 450 gpm w/2080 psi w/11.84 ppg ECD's. 05:30 05:45 0.25 11,855 11,895 INTRM1 DRILL TRIP T RIH f/11,855'to 11,895' (tight spots @ 11,875', 11,895') 05:45 07:30 1.75 11,895 12,263 INTRM1 DRILL WASH T Unable to work past 11,895'-PU to 11,855'Wash down f/11,855'to 12,263'-300 gpm @ 1300 psi w/80 rpm's-19 k torque- 07:30 11:00 3.50 12,263 12,263 INTRM1 DRILL CIRC T Circ btms up-staging pump up to 600 gpm @ 3250 psi/80 rpm's-17 k torque-Wt. up f/11.0 ppg to 11.5 ppg-slowing pump rate f/600 gpm @ 3250 psi to 475 gpm @ 2240 psi to keep ECD's below 12.1 ppg EMW -Obtain SPR's 11:00 11:15 0.25 12,263 12,263 INTRM1 DRILL TRIP T Flow Ck (statci)Attempt to pull on elevators-tight hole pulling up to 350 k(30 k over)worked several times unable to break over 11:15 12:00 0.75 12,263 12,263 INTRM1 DRILL CIRC T Circ @ 450 gpm @ 1970 psi w/80 rpm's 18 k torque Discussed forward plan w/Drilling Engineer in Anchorage Page 26 of 49 Time Logs Date From To Dur S. Depth E. Depth Phase Code Subcode T Comment 12:00 13:15 1.25 112,263 11,477 INTRM1 DRILL TRIP T Made wiper trip w/pump only f/ 12,263'to 11,477'(thru Miluveach formation)@ 450 gpm @ 1990 psi. Initial PU wt.340-final PU wt 290- Shut pump down&attempted to pull f/11,508'to 11,477'Pulling up to 355 k-Unable to break over 13:15 14:00 0.75 11,477 12,193 INTRM1 DRILL TRIP T RIH f/11,477'to 12,193'on elevators -Average down wt. 165 k 14:00 15:30 1.50 12,193 12,263 INTRM1 DRILL CIRC T Wash in the hole f/12193'to TD @ 12263'. Pumping 450 gpm w/2000 psi. Circulate bottom's up. 15:30 18:00 2.50 12,263 10,624 INTRM1 DRILL TRIP T Load drill pipe w/casing running pill and well bore strengthing pil, displace to bit. Pump while pulling pipe to leave pill in annulus below bit. Pull bit 30feet per min. Pump 30 strokes per minute. Pulled out of the hole f/12263'to 10624'. Initial PU wt 320k, SO wt 175k @ 12263'.At 10624', PU wt 260 to 270k. 18:00 22:45 4.75 10,624 5,994 INTRM1 DRILL TRIP T Pull out of the hole on the trip tank f/ 10624'to 5994',wiping out tight spots.Tight spots were @ 6467'(20k over)and then at 5978'and 5913'(40-50k overpull). 22:45 00:00 1.25 5,994 5,899 INTRM1 DRILL TRIP T Slacked off to 5994'.Made a top drive connection. Pumping 300 gpm w/850 psi, later stagging up to 350 gpm w/1000 psi. MWD showing 11.98 ppg ECD's. 06/09/2011 Trip out f/5889'(pulling some, pumping some, reaming some)to 2716', pumped a 35 bbl hi vis sweep to 2621', monitor well-slight drop in fluid. Continue to POOH,turn off MWD, lay down BHA,flush stack,change upper pipe rams f/3-1/2"x 6"to 4-1/2"x 7",set test plug, rig up f/BOPE test. Witness of test waived by AOGCC inspector Matt Herrera. 00:00 01:15 1.25 5,899 5,899 INTRM1 DRILL TRIP T Working tight hole @ 5899' w/pump @ 8.5 bbls/min @ 1020 psi-190 k PU 160 k SO-worked free up to 5873'-RIH to 5899' 01:15 02:30 1.25 5,899 5,523 INTRM1 DRILL TRIP T Flow Ck(static)-POOH on elevators f/5899'to 5523'-PU wt 190 SO wt 150-worked through tight spots @ 5490', 5484',5478' 02:30 07:00 4.50 5,523 5,337 INTRM1 DRILL TRIP T Attempt to pump 8.5 bpm w/970 psi through tight hole @ 5470'-no go. BROOH f/5523'to 5337'. Initial pump rate 6 bbls/min @ 530 psi,at 5415' increased pump rate to 8.5 bpm w/ 970 psi. Rotate w/80 rpm's @ 8 k torque. 07:00 07:30 0.50 5,337 5,337 INTRM1 DRILL TRIP T POH f/5337'to 5274'on elevators- worked tight spots @ 5334', 5305', & 5274'-RIH to 5337' 07:30 08:30 1.00 5,337 5,243 INTRM1 DRILL TRIP T BROOH f/5337'to 5243'@ 8.5 bbls/min @ 970 psi w/80 rpms @ 8.5 k torque Page 27 of 49 Time Logs Date From To Dur S. Depth E. Depth Phase Code Subcode T Comment 08:30 09:30 1.00 5,243 5,243 INTRM1 DRILL CIRC T Pumped bit balling sweep @ 5243' @ 8.5 bbls/min @ 960 psi w/80 rpms 8 k torque 09:30 10:00 0.50 5,243 4,964 INTRM1 DRILL TRIP T POH on elevators f/5243'to 4964'- PU wt. 180 SO wt 155-worked tight spots @ 4925',4917',&4903' 10:00 12:00 2.00 4,964 4,778 INTRM1 DRILL TRIP T BROOH f/4964'to 4778'@ 415 gpm @1190 psi-w/80rpms @8k torque-stalled rotary @ 4871'& 4783'-Increased pump rate to 450 gpm&100 rpms @ 4871'to 4478' 12:00 15:30 3.50 4,778 2,905 INTRM1 DRILL TRIP T Cont. BROOH f/4778'to 4406'- increased pump to 475 gpm @ 1480 psi w/100 rpms-increased pump rate to 500 gpm @ 1650 psi @ 4688' w/100 rpms-Pulled on elevators f/ 4406'to 4285'(tight)-RIH to 4312'- Back ream f/4312'to 3844'@ 500 gpm @ 1650 psi w/100 rpms-8 k torque-Pulled on elevators f/3844' to 2905'- 15:30 16:30 1.00 2,905 2,716 INTRM1 DRILL TRIP T BROOH f/2905'to 2716'. Pumping 462 gpm w/1340 psi. Rotate 100 rpm w/8k ft lbs of torque. 16:30 17:00 0.50 2,716 2,621 INTRM1 DRILL TRIP T Pumped a 35 bbl hi vis sweep 11.5 ppg,brought back a lot of cutting (50%increase in cuttings-might have been inhibited cuttings-bigger cuttings and dry on inside. Rotate 100 rpm w/8k ft lbs of torque.work f/ 2716'to 2621'. 17:00 18:45 1.75 2,621 745 INTRM1 DRILL TRIP P Pull out of hole on elevators f/2621' to 745', monitor well on the trip tank. 18:45 19:45 1.00 745 191 INTRM1 CASING TRIP P Monitor well-slight drop in fluid. POOH f/745'to 191'. 19:45 20:30 0.75 191 0 INTRM1 DRILL PULD P Continue to POOH w/BHA f/191 to 97',pull up to 72',shut off MWD, PJSM on laying down BHA to pipe shed, lay down BHA. 20:30 21:30 1.00 0 0 INTRM1 DRILL CIRC P Make up stack washing tool. Flush stack pumping 14.8 bpm w/400 psi. Lay down tool. Flow check well- satic. 21:30 22:00 0.50 0 0 INTRM1 WHDBO BOPE P Drain stack, pull FMC wear bushing- wear bushing marked junk by FMC rep Bobby Sheets.Wear at the top end, near the"J"slot. 22:00 23:00 1.00 0 0 INTRM1 WHDBO BOPE P Pre job safety meeting,then change out top pipe rams f/3-1/2"x 6"to 4-1/2"x 7". 23:00 00:00 1.00 0 0 INTRM1 WHDBO BOPE P Pre job safety meeting,then rig up to test BOPE.Two week test,witness of test waived by AOGCC inspector Matt Herrera. 06/10/2011 BOPE test. Witness of test waived by AOGCC inspector Matt Herrera. PJSM, RU/Run 7"26 ppf L-80 csg per detail to 2566', circulate, con't to 5356',circulate,con't to 8150',circulate. Page 28 of 49 Time Logs Date From To Dur S. Depth E. Depth Phase Code Subcode T Comment 00:00 05:15 5.25 0 0 INTRM1 WHDBO BOPE P Test BOPE.Witness of test waived by AOGCC inspector Matt Herrera. Performed complete BOP test w/5" test joint,then tested upper pipe and annular w/7"test joint.Tested Annular to 250 psi low and 2500 psi high/both sizes.Tested upper rams (4-1/2"x 7"VBR)and Lower pipe (3-1/2"x 6")to 250 psi low and 3500 psi high. Hold each test 5 minutes. Chart tests.Tested all valves in the choke manifold,tested Demco valve on mud line.Tested floor safety valve and IBOP.Tested upper and lower IBOP on the top drive. Performed 6°C accumulator test: System press 3000, after closing 1300 psi,200 psi 105 build up in 32 seconds,full charge 175 seconds.Tested upper pipe rams to 250 psi low and 3500 psi high w/7"test joint.Tested gas alarms(Methane and H2S). 05:15 05:45 0.50 0 0 INTRM1 WHDBO BOPE P Rig down testing equipment. Set casing running wear bushing w/ 10-5/16"ID. Blow down choke manifold. 05:45 06:45 1.00 0 0 INTRM1 CASING RURD P PJSM-Rig up to run 7"26 ppf L-80 BTC-m casing. 06:45 07:15 0.50 0 0 INTRM1 RIGMN1 RGRP T PJSM-Change out TD grab dies 07:15 08:30 1.25 0 0 INTRM1 CASING RURD P Cont. rigging up to run 7"casing 08:30 08:45 0.25 0 0 INTRM1 CASING SFTY P PJSM w/crew on running 7"casing 08:45 12:00 3.25 0 1,717 INTRM1 CASING RNCS P Ran 7"26#L-80 BTC-M casing as follows:Float shoe(Ray Oil Tools silver bullet)2 jts csg-Float collar (Halliburton Super Seal II w/baffle adaptor installed) 1 jt csg-Baffle collar(Halliburton) 1 jt csg to 167'- First 4 connections made up w/ BakerLoc-filled pipe&circ to check floats-Cont. RIH f/167'to 1717'w/ 7"casing-40 jts total in hole Installed 1 Hydro-Form centralizer per jt onjts#2to#40 12:00 12:45 0.75 1,717 2,566 INTRM1 CASING RNCS P Cont. RIH w/7"26#L-80 BTC-M casing f/1717'to 2566'(60 jts total in hole) 12:45 13:30 0.75 2,566 2,566 INTRM1 CASING CIRC P Establish circulation&circulate casing volume(98 bbls)while staging pump up to 6 bbls/min @ 320 psi Page 29 of 49 Time Logs Date From To Dur S. Depth E. Depth Phase Code Subcode T Comment 13:30 17:00 3.50 2,566 5,356 INTRM1 CASING RNCS P Cont. RIH w/7"26#L-80 BTC-M casing f/2566'to 5356'(125 jts total in hole) String took wt. @ 2905'-Picked up &worked twice-went on thru OK No other spots to 5356' 17:00 18:30 1.50 5,356 5,356 INTRM1 CASING CIRC P Establish circulation&circ btms up- staging pump up to 6 bbls/min @ 480 psi. Pumped a total of 430 bbls. PU wt before circ 180k, SO wt 145k. After circulating PU 180k, SO 150k. 18:30 22:15 3.75 5,356 8,150 INTRM1 CASING RNCS P Cont. RIH w/7"26#L-80 BTC-M casing f/5356' to 6644'(jt#155), installed Halliburton stage tool. Baker lock top and bottom connections,then run f/6646'to 8150'(190 jts total in hole). Hydro-forms were run to jt#181. Record PU and SO wt's every 10 jts. 22:15 00:00 1.75 8,150 8,150 INTRM1 CASING CIRC P Circulate at planned depth of 8150' (Jt#190 in the hole). Reciprocate 25' stroke f/8150'to 8125'. PU wt 260k, SO wt 160k.After circulation PU wt 245k, SO wt 162k. Staged pumps up f/2 bpm w/460 psi, after 50 bbls pumped increased rate to 3 bpm w/520 psi,after pumping a total of 80 bbls increased rate to 4 bpm w/600 psi,after pumping a total of 200 bbls increased to 5 bpm w/610 psi initial, final of 560 psi.. Circulated a total of 410 bbls. Heaviest mud wt out was 11.7+. 06/11/2011 Circulate @ 8150',con't run 7"26 ppf L-80 casing to 10444', circulate(lost returns while staging pumps f/4 to 5 bpm after pumping 250 bbls),work pipe, RIH w/ casing f/10,444 to 12,215'-MU FMC mandrel fluted hanger&landing jt. -Landed casing on hanger in wellhead w/shoe @ 12,252.54'RD casing equipment-RU Cmt equipment-Circ&attempt to regain returns-Pumped 35 bbls @ 1 bbl.min @ 400 psi-No returns- Pumped 1st stage cement job-127 bbls(616 sks)-15.8 ppg tail slurry-Displaced w/449 bbls 11.0 ppg mud -No returns&didn't bump plug-Shut in cmt head&WOC. Bled off pressure of 1000 psi,check flow and load closing plug in cement head, pressure up to open stage tool @ 5605', circulate and condition mud f/2nd stage cement job. 00:00 01:00 1.00 8,150 8,150 INTRM1 CASING CIRC P Finish circulating at planned depth of 8150'(Jt#190 in the hole). Reciprocate 25'stroke f/8150'to 8125'. PU wt 260k,SO wt 160k. After circulation PU wt 245k, SO wt 162k. After pumping a total of 200 bbls increased to 5 bpm w/610 psi initial, final of 560 psi. Circulated a total of 410 bbls. Heaviest mud wt out was 11.7+. Page 30 of 49 Time Logs Date From To Dur S. Depth E. Death Phase Code Subcode T Comment 01:00 04:15 3.25 8,150 10,444 INTRM1 CASING RNCS P Cont. RIH w/7"26#L-80 BTC-M casing f/8150'to 10444'(Jt#243 in the hole). PU wt 300k,SO wt 160k. Run straight blade centralizers on jts 227,228 and 229. Run Low torque roller centralizers starting on jt#230,every jt. Record PU and SO wt's every 10 jts. 04:15 06:00 1.75 10,444 10,444 INTRM1 CASING CIRC P Circulate at 10444'(Jt#243 in the hole). Reciprocate 30'stroke f/ 10444'to 10400'. PU wt 300k,SO wt 160k. Staged pumps up f/1.5 bpm w/550 to 580 psi,after 25 bbls pumped increased rate to 2 bpm w/580 psi, after pumping a total of 55 bbls increased rate to 3 bpm w/620 to 520 psi,went back to 2 bpm until 80 bbls were pumped.After pumping a total of 80 bbls increased rate to 2.5 bpm w/560 psi,after pumping a total of 110 bbls increased rate to 3 bpm w/620 psi,after 155 bbls pumped increased rate to 3.5 bpm w/640 to 680 psi.After pumping 200 bbls increased rate to 4 bpm w/660 to 720 psi.After pumping a total of 250 bbls increased pump rate to 5 bpm w/790 to 820 psi. After pumping 280 bbls, lost returns-hole staying full. Heaviest mud wt out was 11.7+. 06:00 06:30 0.50 10,444 10,444 INTRM1 CASING CIRC T Shut down pumping,work pipe f/ 10444'to 10400'. PU wt 290k,SO wt 175k. Conferred w/Anchorage drilling engineer on forward plan 06:30 08:45 2.25 10,444 12,252 INTRM1 CASING RNCS P Cont. RIH w/7"26#L-80 BTC-M casing f/10444'to 12,215'(Jt#284 in the hole) PU FMC fluted mandrel hanger&landing jt.-_Landed casing in wellhead on hanger w/shoe p 12,252'-FC P,12,169'-Baffle collar @ 12128'-Stage collar @ 5605' Ran Low torque roller centralizers starting on jt#244,every jt to jt# 276-Ran straight blade centralizers on jts.#280&282 Record PU and SO wt's every 10 jts. 08:45 09:15 0.50 12,252 12,252 INTRM1 CEMEN-RURD P RD fill up tool&blow down TD-MU cmt head&lines- 09:15 10:00 0.75 12,252 12,252 INTRM1 CEMEN-CIRC P Attempt to circ pumped 35 bbls @ 1 bbi/min(a)400 psi-No Returns 10:00 10:15 0.25 12,252 12,252 INTRM1 CEMEN-SFTY P Held PJSM on cementing 7"casing Page 31 of 49 Time Logs Date From To Dur S. Depth E. Depth Phase Code Subcode T Comment 10:15 12:00 1.75 12,252 12,252 INTRM1 CEMEN-PUCM P Pumped 1st stage cement job as follows: Pumped 2 bbls CW-100- ae Tested lines to 3600 psi-Pumped .( 38 bbls CW-100 @ 4 bbls/min @ C't 800 psi-Mixed&pumped 35 bbls 12.5 ppg MudPush @ 4.7 bbls/min @ 800 psi-Lined up valves on cmt head-pumped out bottom plug w/5 bbls 12.5 ppg MudPush @ 4 bbls/min @ 650 psi-Loaded top plug in cement head-Mixed& pumped 127 bbls.(616 sks)@ 15.8 ppg tail slurry(Class G w/0.2% D46, 0.3% D65,0.11% B155, 0.4% D167)@ 5.3 to 5.5 bbls/min @ 800 psi-Dropped top plug w/20 bbls water f/Dowell-Switched over to rig pumps *No Returns *** 12:00 13:30 1.50 12,252 12,252 INTRM1 CEMEN-DISP P • cement 449 bbls-11.0 ppg LSND mud w/rig pumps @ 5 to 3 bbls/min @ 500 psi to 1110 psi- CW100 turned corner @ 242 bbls pumped @ 820 psi-MudPush turned corner @ 282 bbls pumped @ 750 psi-Cmt.turned corner @ 322 bbls pumped @ 760 psi- w/400 bbls pumped @ 1120 psi-slowed pump to 3 bbls/min-Final pressure before shutting pump down 1110 psi -Didn't bump plug-CIP as 1330 hrs._, -Shut in cmt head w/600 psi- Pumped entire job w/no returns 13:30 20:00 6.50 12,252 12,252 INTRM1 CEMEN"WOC P WOC to be able to pressure up& open stage collar to pump 2nd stage of 7'cement job- clean up rig floor- LD casing equipment-perform work orders. 20:00 20:15 0.25 12,252 12,252 INTRM1 CEMEN-WOC P Pre job safety meeting while waiting on cement. Bleed off 1050 psi on the casing.Check f/flow-none. Install 7" closing plug f/the Halliburton cementer. Page 32 of 49 Time Logs Date From To Dur S. Depth E. Depth Phase Code Subcode T Comment 20:15 00:00 3.75 12,252 12,252 INTRM1 CEMEN"CIRC P Open stage collar by pressuring up to 3620 psi. Initiate pumps starting w/13 spm(1.3 bpm)w/380 psi w/ slight circulation,decrease rate to 10 spm(1 bpm)w/390 to 400 psi and slight flow,decrease rate to 7 spm (.7 bpm)w/380 to 390 psi and flow. Monitor and track a 20-24%loss rate over a time interval.Staged rate up monitoring no more losses after pumping 57 bbls-full returns. While pumping 7 spm, pressure decreased to 300 psi,strokes increased to 8 spm w/270 initial and 230 psi final after a total of 105 bbls pumped. Increased rate to 16 spm w/ initial 270 psi,final of 260 psi.After pumping 126.6 bbls increased rate to 2.5 bpm w/310 psi,final of 320 psi. Increased rate to 3.5 bpm w/initial 360 psi after pumping a total of 168.3 bbls,final pressure of 280 psi.After pumping 257 bbls, increased rate to 4.5 bpm w/initial 340 psi,final of 300 psi with 347 bbls pumped. Increase to 5.5 bpm with initial 360 psi and final of 350 psi after pumping 418 bbls. Increase rate to 6 bpm w/380 psi initial and final of 370 psi. Pumped a total of 638.4 bbls of mud, conditioning f/11.5 ppg to 11 ppg, PV/YP to 13/19. Held PJSM with crew during last 45 minutes of pumping w/full returns. Note this is the full circulation At. midnight we were pumping 6 bpm w/ 370 psi and a total of 465 bbls pumped.The 2nd stage cement job was done w/full circulation. Note Total fluid lost to well today was 759 bbls. 06/12/2011 Circulate prior to cementing, cement 2nd stage of 7"casing, Rig down casing equipment, L/D landing joint, istall FMC packoff,test to 5000 psi f/10 minutes, L/D drilling BHA, Change top pipe rams,test rams,Safety stand down,slip and cut drill line, L/D 5"dp f/derrick, repair iron roughneck, con't laying down 5"f/derrick, repair iron roughneck, con't L/D dp. Held Safety stand down @ 1000 hrs w/both crews, Held another @ 1930 hrs f/those missed. 00:00 00:15 0.25 12,252 12,252 INTRM1 CEMEN-CIRC P Cont. circulating&conditioning mud for 2nd stage cement job @ 6 bbl/min @ 380 psi.Circulated a total of 368.4 bbls prior to cementing. While pumping first 57 bbls, returns were 75 to 80%of volume pumped, after 57 bbls, 100%returns. Reduced mud wt to 11 ppg. PV/YP= 13/19. 00:15 00:30 0.25 12,252 12,252 INTRM1 CEMEN-SFTY P Held PJSM w/crew on 2nd stage cement job Page 33 of 49 Time Logs Date From To Dur S. Depth E. Depth Phase Code Subcode T Comment 00:30 01:30 ' 1.00 12,252 12,252 INTRM1 CEMEN-PUCM P Pumped 2nd stage cement on 7" casing as follows: pumped 2 bbls CW-100-Tested lines to 3500 psi- pumped 18 bbls CW-100 @ 3.5 bbls/min @ 235 psi-Mixed& pumped-20 bbls 12.5 ppg MudPush @ 4.5 bbls/min @ 300 psi-Mixed& pumped 40 bbls(195 sks) 15.8 ppg Alpine Qannik blend tail slurry(Class G w/0.2%D46,0.3%D65, 0.4%D167, D177 as needed)@ 4.8 bbls/min @ 368 to 221 psi-Dropped closing plug w/20 bbls water f/ Dowell-Switched over to rig pumps to displace 01:30 02:30 1.00 12,252 12,252 INTRM1 CEMEN"DISP P Displaced cement w/195 bbls 11.0 ppg LSND mud @ 5 bbls/min @ 200 psi initial and 390 spi final,slowed to 2 bpm w/220 psi until bumping plug -Bumped plug&pressured up to 1450 psi to close stage collar- pressured up to 2000 psi&held for 5 mins.-Bleed off pressure&observed well(static)-CIP @ 0213 hrs. Full returns throughout cement job. Note: Pump output was calculated at.098 bps after bumping plug (194.47 bbls/1984 strokes) 02:30 03:15 0.75 0 0 INTRM1 CEMEN-RURD P RD cement lines&head-LD landing jt. 03:15 04:30 1.25 0 0 INTRM1 WHDBO PRTS P Pull casing running wear bushing- Set&test 7"pack-off to 5000 psi for 10 mins. 04:30 05:00 0.50 0 0 INTRM1 DRILL RURD P LD long bails-PU drilling bails&5" elevators 05:00 06:00 1.00 0 0 INTRM1 DRILL PULD P PU BHA components f/shed-Break down motor-bit&stab-lay back down-LD NM flex DC's 06:00 10:00 4.00 0 0 INTRM1 WHDBO BOPE P Change top pipe rams f/4 1/2"x 7' , Vf3R to 3 1/2"x 6"VBR-Set test , plug-Test Hydril to 250&2500 psi- Tested top&bottom pipe rams to 250&3500 psi-Tested 4"dart valve &ful opening floor safely valve to 250 &3500 psi-RD test equipment- Pull test plug-Install wear bushing 10:00 12:00 2.00 0 0 INTRM1 DRILL SFTY P Safety StandDown meeting in rig camp 12:00 12:15 0.25 0 0 INTRM1 DRILL PULD P PJSM-PU&std back 1 std HWDP -PU Geo Span skid Page 34 of 49 Time Logs Date From To Dur S. Depth E. Depth Phase Code Subcode T Comment 12:15 13:45 1.50 0 0 INTRM1 RIGMNT SLPC P PJSM on slip&cut of drill line-Slip &cut 75'drill line-service rig. Sim ops: Dowell perform injectivity w/11ppg mud in the hole(broke at 500 psi-9-5/8"shoe @ 2594' MD-2440'TVD=14.94 EMW @ shoe.The top of cement est @ 4556' MD-3835'TVD= 13.5 ppg EMW @ top of cement. Flush w/300 bbls h2o and freeze protect well w/43 bbls diesel f/1215 hrs to 1440 hrs. 13:45 15:45 2.00 0 0 INTRM1 DRILL PULD P Lay down 5"drill pipe from the derrick,via mousehole. 15:45 17:45 2.00 0 0 INTRM1 RIGMN1 RGRP T Work on the VARCO Iron Roughneck. 17:45 20:15 2.50 0 0 INTRM1 DRILL PULD P Lay down 5"drill pipe from the derrick,via mousehole. Sim Ops: Held Safety stand down with those who did not attend the one at 1000 hrs. 20:15 22:15 2.00 0 0 INTRM1 RIGMNT RGRP T PJSM. Repair Varco Iron Roughneck. Replaced the support posts on the pipe spinners. 22:15 00:00 1.75 0 0 INTRM1 DRILL PULD P Lay down 5"drill pipe from the derrick,via mousehole. Layed down 34 stands. 06/13/2011 Finish LD 5"DP-PU 4"DP-MU BHA#5-RIH w/4"DP f/pipe shed to 5339'-test csg to 1000 psi-drill out stage collar @ 5605'-wash to 6007'-Re test csg to 3600 psi-POOH w/C/O assembly f/6007'to 3144'. 00:00 04:30 4.50 0 0 INTRM1 DRILL PULD P Finish laying down 5"drill pipe f/ derrick 04:30 05:30 1.00 0 0 INTRM1 DRILL RURD P Changed dies in iron roughneck for 4"DP-changed elevators for 4"drill pipe. INTRM1 08:45 3.25 0 0 DRILL PULD P Pick up&stand back 26 stands(78 jts)4"drill pipe from pipe shed 08:45 09:15 0.50 0 0 INTRM1 DRILL PULD P Pick up BHA componets from bottom of beaver slide&bring to rig floor. 09:15 10:15 1.00 0 287 INTRM1 DRILL PULD P MU BHA#5(clean out assembly) bit-float sub-stab-3 NM flex DC's -XO- Jars-5 jts HWDP to 287' 10:15 12:00 1.75 287 1,236 INTRM1 DRILL TRIP P RIH w/clean out assembly f/287'to 1236'-picking up 4"DP f/pipe shed 12:00 15:15 3.25 1,236 5,339 INTRM1 DRILL TRIP P Cont. RIH w/CO assembly f/1236' to 5339'-Picking up 4"DP f/pipe shed 15:15 15:30 0.25 5,339 5,339 INTRM1 DRILL CIRC P PJSM,then circulate bottom's up pumping 350 gpm w/1680 psi. Rotate 60 rpm w/7k ft lbs of torque. 15:30 15:45 0.25 5,339 5,339 INTRM1 DRILL PRTS P Rig up to test casing to 1000 psi f/ 10 minutes. 15:45 16:15 0.50 5,339 5,339 INTRM1 DRILL PRTS P Test casing to 1000 psi prior to drilling out Halliburton stage collar @ 5605'. Good test. 16:15 16:30 0.25 5,339 5,339 INTRM1 DRILL PRTS P Rig down testing equipment. Page 35 of 49 Time Logs Date From To Dur S. Depth E. Depth Phase Code Subcode T Comment 16:30 17:45 1.25 5,339 5,605 INTRM1 DRILL WASH P Wash/Ream down f/5339'to 5605'. Rotating 60 to 90 rpm w/6.5 to 6k ft lbs of torque. 17:45 18:45 1.00 5,605 5,608 INTRM1 CEMEN-DRLG P Drill out Halliburton stage collar f/ 5605'to 5608'. Rotate 90 rpm w/8k ft lbs of torque. Pumping 250 gpm w/ 640 psi. Run 8 to 12k weight on bit. 18:45 20:00 1.25 5,608 6,007 INTRM1 DRILL WASH P Wash down f/5608'to 6007'. 20:00 20:30 0.50 6,007 6,007 INTRM1 DRILL CIRC P Circulate bottoms up,adding defoamer to remove air f/mud. MW in and out 10.9 ppg. Pumping 345 gpm w/1700 psi. Rotate 45 rpm w/ 7.5 ft lbs of torque. PU wt 160k,SO wt 130k, Rot wt 140k. 20:30 20:45 0.25 6,007 6,007 INTRM1 DRILL SFTY P PJSM on Rig up and test of 7" casing. 20:45 21:00 0.25 6,007 6,007 INTRM1 DRILL PRTS P_Rig up to test 7"casing to 3500 psi. 21:00 21:45 0.75 6,007 6,007 INTRM1 DRILL PRTS P Test 7"26 ppf L-80 BTC-m casing to 3600 psi, pumping down the drill pipe and the annulus(Kill line)w/top pipe rams(3-1/2"x 6"VBR)closed. Chart test. Lost 30 psi-good test. 56 strokes to test, hold f/30 minutes w/ 30 psi pressure loss. Bleed off test pressure. Open top pipe rams. 21:45 22:00 0.25 6,007 6,007 INTRM1 DRILL PRTS P Rig down testing equipment, blow down lines. 22:00 00:00 2.00 6,007 3,144 INTRM1 DRILL TRIP P Trip out of the hole w/BHA#5 (cleanout assembly)f/6007'to 3144'. 06/14/2011 Finish POOH w/BHA#5, PU rack back 5 stands of 4"dp, PU/MU BHA#6(geopilot),single in the hole f/396' to 11,464'MD'-Wash f/11,464'to 12,048'MD(Tagged Cement)-Displace Well f/11 PPG LSND to 9 PPG • MOBM-Drill Shoe track f/12,048'to 12,070'MD 00:00 00:30 0.50 3,144 287 INTRM1 DRILL TRIP P Finish POOH w/BHA#5(cleanout assembly)f/3144'to 287'. 00:30 01:00 0.50 287 0 INTRM1 DRILL PULD P Work BHA, break off bit, bit sub and stabilizer. 01:00 01:45 0.75 0 0 INTRM1 DRILL PULD P Pick up/make up and stand back 5 stands of 4"drill pipe f/the pipe shed. Rabbit w/2.13"Teflon rabbit. Note:84 stands(252 jts)of 4"dp in the derrick. 01:45 03:30 1.75 0 105 INTRM1 DRILL PULD P PU/MU BHA#6:6-1/8"HDBS FMF3543ZZ bit(ser#11271558), 5200 geopilot(ser#TL-086),geopilot flex collar, ILS stab, pin x pin x-o, ADR collar, ILS stab, DM collar, DGR, PWD,TM HOC, Float sub w/ float installed. 03:30 04:15 0.75 105 105 INTRM1 DRILL PULD P Pick up 60'to upload Sperry Sun MWD,then upload same, RIH to 105'. 04:15 04:45 0.50 105 396 INTRM1 DRILL TRIP P Finish MU BHA#6 to 396.21': (3) flex collars,x-o, DNT jar, 1 jt 4" HWDP, Bumper jar,4(4)jts 4" HWDP. Page 36 of 49 Time Logs Date From To Dur S. Depth E. Depth Phase Code Subcode T Comment 04:45 05:45 1.00 396 426 INTRM1 DRILL CIRC P PU one single of 4"dp f/pipe shed, then make a top drive connection. Shallow pulse test MWD tools @ 426'. Pumping 175 gpm(41 spm)w/ 600 psi. Break in seals on the geopilot. Pressure test geospan to 3500 psi. Send down link to the geopilot. Blow down the top drive. 05:45 12:45 7.00 426 8,028 INTRM1 DRILL TRIP P Continue to PU/MU RIH w/BHA#6, picking up 4"dp f/pipe shed f/426' to 8,028'MD. Rabbit w/2.13"Teflon rabbit. 12:45 13:30 0.75 8,028 8,028 INTRM1 RIGMNT RGRP T Repair Pipe Skate Control Panel on the Rig Floor 13:30 16:45 3.25 8,028 11,464 INTRM1 DRILL TRIP P Continue to RIH f/8,028'to 11,464' MD 16:45 19:45 3.00 11,464 12,048 INTRM1 DRILL WASH P Wash Down f/11,464'to 12,048'MD (Appear to Be Pushing Junk Below the Bit)-Tagged Cement 19:45 22:00 2.25 12,048 12,048 INTRM1 DRILL CIRC P PJSM; Displace Well f/11 PPG LSND to 9 PPG MOBM @ 4 BPM w/ 2300 Psi and 40 RPM 22:00 23:30 1.50 12,048 12,090 INTRM1 CEMEN"DRLG P Washed Cement f/12,048'to 12,070' MD-Drilled Cemented Shoe Track f/ 12,070'to 12,090'MD w/175 GPM @ 1400 Psi and 50 RPM 06/15/2011 Continue to Clean Out Cement to the Top of the Baffle Collar U 12,127'MD-Drill Shoe Track&Rat Hole f/ 12,127'to 12,263'MD-Drill 20' New Hole U 12,283'MD-CBU-Perform FIT U 12.5 PPGE(1350 Psi)-Drill 6 1/8"Hole f/12,283'to 13,253'MD 00:00 00:30 0.50 12,090 12,127 INTRM1 CEMEN-COCF P Continue to Clean Out Cement to the Top of the Baffle Collar 12,127'MD 165-220 GPM w/1350-2160 Psi and 40-60 RPM 00:30 04:45 4.25 12,127 12,263 INTRM1 CEMEN"DRLG P Drill Baffle Collar, Float Collar, Float Shoe, Rat Hole and Cement in Between f/12,127'to 12,263'MD 220 GPM w/2180 Psi;70 RPM w/ 12 K Torque 04:45 05:15 0.50 12,263 12,283 INTRM1 DRILL DDRL P Drill 20'of New Hole f/12,263'to 12,283'MD(7,404'ND) ADT.34 P/U 240,S/O 160, Rot 195 WOB 15, RPM 90 Torque On/Off 12/11.5 220 GPM @ 2220 Psi ECD 10.26 05:15 06:15 1.00 12,283 12,283 INTRM1 DRILL CIRC P CBU Prior to FIT-220 GPM w/2180 Psi and 60 RPM 06:15 06:45 0.50 12,283 12,283 INTRM1 DRILL FIT P R/U and Perform FIT U 12.5 PPG EMW(1350 Psi) Page 37 of 49 Time Logs Date From To Dur S. Depth E. Depth Phase Code Subcode _ T Comment 06:45 12:00 5.25 12,283 12,560 PROD1 DRILL DDRL P Drill 6 1/8"Hole f/12,283'to 12,560' MD ADT 3.03 P/U 240, S/O 160, Rot 194 WOB 13, RPM 110 Torque On/Off 12.5/12 220 GPM @ 2260 Psi ECD 10.57 12:00 00:00 12.00 12,560 13,253 PROD1 DRILL DDRL P Drill 6 1/8"Hole f/12,560'to 13,253' MD ADT 8.03 P/U 243, S/O 152, Rot 190 WOB 15, RPM 110 Torque On/Off 12/12.5 220 GPM @ 2330 Psi ECD 10.65 06/16/2011 Continue to Drill 6 1/8"Hole f/13,253'to 14,229'MD-OWFF(Static)-CBU X3-Perform Wiper Trip t/13,180' MD PRecautionary Wiper Trip Performed for ECD Control and Geoservices Data Showing 50-60%Cuttings Returns 00:00 12:00 12.00 13,253 13,942 PROD1 DRILL DDRL P Continue to Drill 6 1/8"Hole f/ 13,253'to 13,942'MD ADT 7.82 P/U 250, S/O 145, Rot 190 WOB 15, RPM 110 Torque On/Off 12/13.5 220 GPM @ 2330 Psi ECD 10.57 12:00 17:30 5.50 13,942 14,229 PROD1 DRILL DDRL P Continue to Drill 6 1/8"Hole f/ 13,942'to 14,229'MD ADT 3.8 P/U 255,S/O 150, Rot 185 WOB 15, RPM 110 Torque On/Off 14/13.5 220 GPM @ 2350 Psi ECD 10.65 17:30 18:00 0.50 14,229 14,229 PROD1 DRILL OWFF P OWFF(Static) 18:00 21:45 3.75 14,229 13,942 PROD1 DRILL CIRC P CBU X3-220 GPM w/2250 Psi and 120 RPM 21:45 22:00 0.25 13,942 13,942 PROD1 DRILL OWFF P OWFF 22:00 00:00 2.00 13,942 13,180 PROD1 DRILL WPRT P POOH w/Pumps t/13,180'MD 220 GPM @ 2180 Psi 06/17/2011 Continue Wiper Trip f/13,180'to 12,227'MD-CBU X2-OWFF(Static)-Repair Top Drive Grabs and Flow Line Boot-RIH f/12,227'to 14,133'MD-Precautionary Ream f/14,133'to 14,229'MD-CBU-Drill Production Interval f/14,229'to 14,994'MD _ 00:00 02:30 2.50 13,180 12,227 PROD1 DRILL WPRT P Conduct Wiper Trip f/13,180'to 12,227'MD w/220 GPM @ 2,000 Psi Page 38 of 49 Time Logs Date From To Dur S. Depth E. Depth Phase Code Subcode T Comment 02:30 04:15 1.75 12,227 12,227 PROD1 DRILL CIRC P CBU X2 @ 220 GPM w/2100 Psi and 70 RPM 04:15 04:30 0.25 12,227 12,227 PROD1 DRILL OWFF P OWFF(Static) 04:30 06:00 1.50 12,227 12,227 PROD1 RIGMNT RGRP P Install Spacer Plates to T/D Grab Heads-Change Flow Line Air Boot in the Pits 06:00 06:45 0.75 14,133 14,229 PROD1 DRILL WASH P Precautionary Wash/Ream f/ 14,133'to 14,229'MD 06:45 08:30 1.75 12,227 14,133 PROD1 DRILL TRIP P RIH f/12,227'to 14,133'MD-Tight Spots 13,880'to 13,925'and 14,050'MD**NOTE: 14,050 Observed Both Directions P/U 260, S/0 143 08:30 09:30 1.00 14,229 14,229 PROD1 DRILL CIRC P CBU @ 220 GPM w/2400 Psi 09:30 12:00 2.50 14,229 14,325 PROD1 DRILL DDRL P Continue to Drill the Production Interval f/14,229'to 14,325'MD ADT 1.98 P/U 255, S/O 142, Rot 190 RPM 110,WOB 10 Torque On/Off 13.5/13.5 213 GPM w/2340 Psi; ECD 10.67 12:00 00:00 12.00 14,325 14,994 PROD1 DRILL DDRL P Continue to Drill f/14,325'to 14,994' MD-Double Back Reaming Every 3rd Stand to Control ECD ADT 6.99 P/U 260,S/0 140, Rot 193 RPM 110,WOB 12 Torque On/Off 14.5/15.5 220 GPM @ 2460 Psi; ECD 10.81 06/18/2011 Drilled Production Hole f/14,946'to 16,234'MD; Double Back Reaming Every Stand 00:00 12:00 12.00 14,994 15,662 PROD1 DRILL DDRL P Continue to Drill 6 1/8"Hole f/ 14,994'to 15,662'MD-Double Back Ream Every Stand ADT 7.82 P/U 265, S/0 138, Rot 190 RPM 110,WOB 12 Torque On/Off 14.5/15.5 220 GPM @ 2690 Psi; ECD 10.93 12:00 00:00 12.00 15,662 16,234 PROD1 DRILL DDRL P Continue to Drill 6 1/8"Hole f/ 15,662'to 16,234'MD; Double Back Ream Every Stand ADT 5.92 P/U 270, S/0 135, Rot 193 RPM 110,WOB 12 Torque On/Off 14.5/15.5 220 GPM @ 2760 Psi; ECD 10.82 06/19/2011 Continue to Drill f/16,234'to 16,521'MD-OWFF-CBU X3-POOH w/Pumps f/16,234'to 12,227'MD- OWFF(Static)-CBU X3-Slip and Cut Drill Line/Adjust Draw Works Brakes-RIH f/12,227'to 14,123'MD Tight Spot @ 14,050' Both Pumping Out and Running Into the Hole Page 39 of 49 Time Logs Date From To Dur S. Depth E. Depth Phase Code Subcode T Comment 00:00 04:00 4.00 16,234 16,521 PROD1 DRILL DDRL P Continue to Drill 6 1/8"Hole f/ 16,234'to 16,521'MD ADT 3.0 P/U 275, S/O 130, Rot 190 Torque On/Off 15.6/16 WOB 13; RPM 110 220 GPM @ 2810 Psi; ECD 11.03 04:00 08:00 4.00 16,521 16,234 PROD1 DRILL CIRC P OWFF(Static)-Obtain SPR's-CBU X3 Prior to Wiper Trip-Stand Back 1 Stand Every Hour V 16,234'MD 220 GPM @ 2670 Psi w/110 RPM 08:00 16:15 8.25 16,234 12,227 PROD1 DRILL WPRT P POOH w/Pumps f/16,234'to 12,227'MD-Tight Spot/Pack Off @ 14,050'MD(Worked Through) 220 GPM @ 2400 Psi 16:15 16:30 0.25 12,227 12,227 PROD1 DRILL OWFF P OWFF(Static) 16:30 19:15 2.75 12,227 12,227 PROD1 DRILL CIRC P CBU X3-220 GPM @ 2200 Psi 19:15 21:45 2.50 12,227 14,133 PROD1 DRILL TRIP P RIH f/12,227'to 14,133'MD-Took Weight @ 14,050'MD;Worked Through 21:45 00:00 2.25 12,227 12,227 PROD1 RIGMNT SLPC P Slip&Cut Drill Line-Service Top Drive-Adjust Brakes 06/20/2011 RIH f/14,133'to 16,425'MD-Wash f/16,425'to 16,521'MD-CBU(No Gas)-Continue to Drill f/16,521'to 16,616'MD-Circulate While Trouble Shooting the Top Drive(Will Not Rotate)-POOH on TT f/16,616'to 12,227'MD-OWFF(Static)-M/U FOSV and 10'Pup-CBU(No Gas)-Replace the Top Drive input Shaft Bearing and Swivel Packing While Circulating @ 5 BPM Through Pump In Tee and Cement Line-OWFF (Static)-LID 10'Pup and FOSV-RIH f/12,227'to 13,656'MD-CBU(No Gas) 00:00 01:15 1.25 14,133 16,425 PROD1 DRILL TRIP P RIH f/14,133'to 16,425'MD 01:15 01:30 0.25 16,425 16,521 PROD1 DRILL WASH P Wash f/16,425'to 16,521'MD 01:30 02:45 1.25 16,521 16,521 PROD1 DRILL CIRC P CBU @ 220 GPM w/2620 Psi 1/ 02:45 04:30 1.75 16,521 16,616 PROD1 DRILL DDRL P Continue to Drill 6 1/8"Hole f/ 16,521'to 16,616'MD ADT.96 P/U 275, S/O 130, Rot 190 RPM 110,WOB 15 Torque On/Off 15.5/16 218 GPM @ 2710 Psi; ECD 11.0 04:30 05:15 0.75 16,616 16,616 PROD1 RIGMNT CIRC T Circ and Condition Mud While Trouble Shooting the Top Drive(Will Not Rotate) 220 GPM @ 2690 Psi 05:15 10:15 5.00 16,616 12,227 PROD1 RIGMNT TRIP T POOH on TT f/16,616 to 12,227' MD;Tight @ 15,051', 13,913', 12,850', 12,290'and 12,260'MD P/U 285, S/O 145 10:15 10:30 0.25 12,227 12,238 PROD1 RIGMN1OWFF T OWFF(Static)-M/U FOSV&Pup Joint RIH V 12,238'MD-R/U Head Pin and Cement Line Page 40 of 49 Time Logs Date From To Dur S. Depth E. Death Phase Code Subcode T Comment 10:30 12:00 1.50 12,238 12,238 PROD1 RIGMNT CIRC T CBU @ 5 BPM w/2240 Psi 12:00 21:30 9.50 12,238 12,238 PROD1 RIGMNT RGRP T Continue to Circulate @ 5 BPM w/ 2200 Psi While Trouble Shooting and Changing the Input Shaft Bearing- Tested Top Drive-Changed Swivel Packing&Pressure Test V 3200 Psi 21:30 21:45 0.25 12,238 12,227 PROD1 DRILL PULD T OWFF(Static)-UD 10'Pup and FOSV 21:45 23:00 1.25 12,227 13,656 PROD1 DRILL TRIP T PJSM-RIH f/12,227'to 13,656'MD 23:00 00:00 1.00 13,656 13,656 PROD1 DRILL CIRC T CBU @ 220 GPM w/2350 Psi-No Gas Observed on Surface 06/21/2011 RIH f/13,656'to 16,616'MD; Stopped to CBU @ 15,089', 15,497'and 16,616'MD,Observed Gas Breaking Out at Bottoms Up at 15,089', and 15,497'MD(None at 16,616'MD)-Resume Drilling Production Hole f/ 16,616'to 17,451'MD 00:00 01:00 1.00 13,656 15,089 PROD1 DRILL TRIP T RIH f/13,656'to 15,089'MD P/U 275, S/O 130 01:00 02:45 1.75 15,089 15,089 PROD1 DRILL CIRC T CBU @ 210 GPM w/2450 Psi, 110 RPM Observed Gas BReak Out @ Bottoms Up 02:45 03:15 0.50 15,089 15,947 PROD1 DRILL TRIP T RIH f/15,089'to 15,947'MD P/U 285, S/O 130 03:15 05:00 1.75 15,947 15,947 PROD1 DRILL CIRC T CBUI @ 210 GPM w/2590 Psi, 110 RPM Gas Breaking Out at Surface 05:00 05:30 0.50 15,947 16,585 PROD1 DRILL TRIP T RIH f/15,947 to 16,585'MD P/U 285, S/O 125 05:30 07:00 1.50 16,585 16,616 PROD1 DRILL CIRC T Wash Down f/16585'to 16,616'MD- CBU @ 200 GPM w/2440 Psi, RPM 100 07:00 12:00 5.00 16,616 16,843 PROD1 DRILL DDRL P Resume Drilling 6 1/8"Hole f/16,616' to 16,843'MD-Double Back 10/ Reaming Every Stand ADT 2.41 P/U 273,S/O 130, Rot 190 Torque On/Off 15.5/15.5 RPM 110,WOB 10 220 GPM @ 2730 Psi; ECD 10.98 12:00 00:00 12.00 16,843 17,451 PROD1 DRILL DDRL P Continue to Drill f/16,843'to 17,451' MD-Double Back Reaming Every Stand ADT 6.27 P/U 295, S/0 125, Rot 193 RPM 110,WOB 16 Torque On/Off 16.5/16.5 220 GPM @ 2840 Psi; ECD 11.02 06/22/2011 Continue to Drill the Production Interval f/17,451'to 18,770'MD Page 41 of 49 Time Logs Date From To Dur S. Depth E. Depth Phase Code Subcode T Comment 00:00 12:00 12.00 17,451 18,131 PROD1 DRILL DDRL P Continue to Drill 6 1/8"Hole f/ 17,451'to 18,131'MD ADT 7.53 P/U 275, S/0 130, Rot 188 Torque On/Off 14/15.5 RPM 110,WOB 13 _220 GPM w/2890 Psi; ECD 11.23 12:00 00:00 12.00 18,131 18,770 PROD1 DRILL DDRL P Continue to Drill 6 1/8"Hole f/ 18,131'to 18,770'MD ADT 8.02 P/U 278, S/O 130, Rot 190 Torque On/Off 14.5/14.5 RPM 110,WOB 15 220 GPM @ 2970 Psi; ECD 11.31 06/23/2011 Drill f/18,770'to 19,289'MD(TD); 7,464'TVD-Circ Hole Clean Standing Back 1 Stand Every%Hour to 18,524'MD-POOH w/Pumps f/18,524'to 14,516'MD-BROOH f/14,516'to 13,565'MD 00:00 09:30 9.50 18,770 19,289 PROD1 DRILL DDRL P Continue to Dril 6 1/8"Hole f/18,770' to 19,289'MD(TD)-7464'TVD ADT 6.97 P/U 300, S/O 125, Rot 191 Torque On/Off 15/14.5 RPM 110,WOB 14 200 GPM @ 2550 Psi; ECD 10.9 09:30 14:30 5.00 19,289 18,524 PROD1 DRILL CIRC P Clrc and Condition Mud While Standing back 1 Stand Every 1/2 Hour t/18,524'MD 220 GPM @ 2660 Psi and 110 RPM 14:30 22:00 7.50 18,524 14,516 PROD1 DRILL TRIP P POOH w/Pumps f/18,524'to 14,516'MD 170 GPM w/1750 Psi 22:00 00:00 2.00 14,516 13,565 PROD1 DRILL REAM P BROOH f/14,516'to 13,565'MD- Tight Hole/Packing Off Throughout Stand 142(13,942'to 13,847'MD). After Clearing Worked Stand w/o Rotary and Pumping 1 BPM for the Full Length w/o Problems 220 GPM w/2300 Psi and 110 RPM 06/24/2011 BROOH f/13,565'to 12,132'MD-OWFF(Static)-Circulate and While Raising MW f/9.0 PPG to 9.2 PPG- POOH w/Pumps f/12,132'to 4,115'MD-POOH on TT U 393'MD-Turn Off MWD and Stand Back BHA- R/U and Test BOPE as Follows:Test Annular Preventer U 250/3500 Psi f/5 Minutes 00:00 04:45 4.75 13,565 12,132 PROD1 DRILL REAM P BROOH f/13,565'to 12,132'MD- Dropped 2"Rabbit @ Stand 128 04:45 05:00 0.25 12,132 12,132 PROD1 DRILL OWFF P OWFF(Static)-L/D Geo-Span 05:00 06:45 1.75 12,132 12,132 PROD1 DRILL CIRC P Circ and Condition Mud Increasing MW f/9.0 to 9.2 PPG 210 GPM w/2260 Psi and 80 RPM Page 42 of 49 Time Logs Date From To Dur S. Depth E. Depth Phase Code Subcode T Comment 06:45 17:30 ' 10.75 12,132 4,115 PROD1 DRILL TRIP P Pump Out of the Hole f/12,132'to 4,115'MD 4 BPM w/900 Psi 17:30 20:00 2.50 4,115 396 PROD1 DRILL TRIP P POOH on TT f/4,115'to 396'MD 20:00 21:00 1.00 396 0 PROD1 DRILL PULD P Turn Off MWD and Stand the BHA Back in the Derrick 21:00 21:30 0.50 0 0 PROD1 WHDBO BOPE P Pull Bowl Protector and Set BOPE Test Plug 21:30 22:30 1.00 0 0 PROD1 WHDBO BOPE P Fill BOPE Stack and Chojke Manifold w/Water-R/U to Test BOPE 22:30 23:30 1.00 0 0 PROD1 WHDBO BOPE P Test BOPE as Follows:Test Annular Preventer w/4"Test Joint t/ 250/2500 Psi f/5 Minutes 06/25/2011 Continue to Test Remaining BOPE Components w/4"and 4'/z'Test Joints-LID BHA#6-R/U and P/U 4 Yz' Liner t/2,449'MD-Run Liner on 4"DP t/12,182'MD-Circ Pipe Volume-Continue to Run Liner t/14,400' MD-Hang Liner Off and Release w/Tail @ 14,400 and TOL @ 11,958'MD-OWFF(Static)-Circ and Condition(Wait for Crew Change) 00:00 04:00 4.00 0 0 PROD1 WHDBO BOPE P Continue BOPE Test as Follows: Tested Upper&Lower Rams w/4" Test Joint t/250/3500 Psi f/5 ' 'yJ Minutes;Choke Manifold Valves 1-16, Demco Valve, Blinds Rams, TIW, Dart, HRC&Manual Kill/Choke Valves to 250/3500 Psi f/5 Minutes; Tested Annular Preventer, Upper and Lower Rams w/4'/i'Test Joint U 250/2500 and 250/3500 as Required -Performed Accumulator Test- AOGCC Inspector John Crisp Waived Witnessing the Test 04:00 04:15 0.25 0 0 PROD1 WHDBO BOPE P Pull Test plug, Set Wear Ring-R/D f/BOPE Test V ` 04:15 06:15 2.00 0 0 PROD1 DRILL PULD P L/D BHA#6 06:15 06:45 0.50 0 0 COMPZ CASING RURD P Clean and Clear the Rig Floor 06:45 07:15 0.50 0 0 COMPZ CASING RURD P R/U to Run 4'/2'IBTM Liner 07:15 07:30 0.25 0 0 COMPZ CASING SFTY P PJSM on Running Liner 07:30 12:00 4.50 0 2,449 COMPZ CASING RUNL P P/U Mule Shoe, 52 Jts of 4''A"Liner, Liner Hanger, Setting Sleeve, Cup Tools, and XO to 2,449'MD 12:00 13:00 1.00 2,449 2,449 COMPZ CASING RUNL P Mix,Apply and Allow Pal-Mix to Cure-P/U DP Elevators 13:00 19:00 6.00 2,449 12,182 COMPZ CASING RUNL P RIH w/Liner on 4"DP f/2,449'to 12,182'MD P/U 235, S/0 145 19:00 20:00 1.00 12,182 12,182 COMPZ CASING CIRC P Circulate 1 Pipe Volume-Obtain Base Line Torque @ 10 and 20 RPM 3 BPM @ 850 Psi 10 RPM= 10K 20 RPM= 10.5K Page 43 of 49 Time Logs Date From To Dur S. Depth E. Depth Phase Code Subcode T Comment 20:00 21:30 1.50 12,182 14,400 COMPZ CASING RUNL P Continue to Run Liner on DP f/ _12,182'to 14,400'MD di i 44v P/U 265,S/O 140 21:30 23:00 1.50 14,400 11,906 COMPZ CASING PACK P Establish Circulation-Drop Liner Setting Ball-Set Hanger w/ Increased Pressure t/3900 Psi to Set Hanger-Set Down on Top of Liner to Verify Set, P/U and Verify Same-Release Pressure-UD 2 Jts of DP t/11,906'MD-Liner Set w/ Tail @ 14,400 and Top of Sleeve @ 11,958'MD(DPM) 23:00 00:00 1.00 11,906 11,906 COMPZ CASING CIRC P OWFF(Static)-Circ and Condition to Allow Crew Change Prior to Displacing Well Bore Fluids 06/26/2011 Displace Well f/9.2 PPG MOBM to 9.2 PPG KCL Brine-OWFF(Static)-POOH Laying Down DP f/the Hole -R/U and Run 4'/z"Upper Completion per the Detail U 5,266'MD 00:00 02:45 2.75 11,906 11,906 COMPZ CASING CIRC P Displace Wellbore Fluids f/9.2 MOBM to 9.2 KCL as Follows; Pump 25 bbls Mineral Oil,45 Bbls 11.2 PPG Viscosified Transition Spacer, 35 Bbls Cleaning Spacer, 35 Bbls Tail Spacer and 500 Bbls of 9.2 PPG KCL @ 4 BPM w/570 Psi V SIMOPS:Slip and Cut Drill Line 02:45 03:00 0.25 11,906 11,906 COMPZ CASING OWFF P OWFF(Static)-Blow Down the Top Drive 03:00 11:00 8.00 11,906 COMPZ DRILL TRIP P POOH on TT, Laying Down Singles f/ the Hole 11:00 11:45 0.75 0 0 COMPZ DRILL PULD P UD Liner Running Tools-UD Flex Collars 11:45 14:15 2.50 0 0 COMPZ RPCOM RURD P Clean and Clear the Rig Floor-R/U to Run Upper Completion 14:15 00:00 9.75 0 5,266 COMPZ RPCOM RCST P Run 4 Completion per Detail t/ 5,266'MD 06/27/2011 Continue to Run the Completion String f/5,66'of 11,893'MD-Tag Liner Top and Spot 200 Bbls of inhibited Brine Followed by 135 BBIs of Uninhibited Brine-Space out WLEG to 2'Above the Liner Top, Drop the Rod and Ball and Set the Packer-Attempt to Pull Seal Assembly from the SBE; Pulled Free w/110 Over Pull and 2800 Psi on the Tubing-Attempt to Sting Seals Back Into SBE for Space Out(Unable)-Discuss Options w/Town-Pull Upper Completion f/11,893'to 11,808'MD 00:00 08:15 8.25 5,266 11,893 COMPZ RPCOM RCST P Continue to Run the 4'/z"Upper Completion f/5,266'to 11,893'MD 08:15 08:30 0.25 11,893 11,893 COMPZ RPCOM PULD P M/U XO and P/U DP Elevators-M/U 1 Stand to 4"DP for Space Out 08:30 08:45 0.25 11,893 11,977 COMPZ RPCOM HOSO P RIH and Tap Locator Sub 84'In Set 10-12K Down to Shear No-Go Pins 08:45 09:00 0.25 11,977 11,977 COMPZ RPCOM SFTY P PJSM on Displacing the Well 09:00 11:00 2.00 11,977 11,977 COMPZ RPCOM CIRC P Pump 200 Bbls of Inhibited Brine Followed by 135 Uninhibited Brine @ 3 BPM w/210 Psi Page 44 of 49 Time Logs Date From To Dur S. Depth E. Death Phase Code Subcode T Comment 11:00 16:00 5.00 11,977 11,893 COMPZ RPCOM PACK P Space Out Locator to 2'Off if Liner Top, Drop the Ball and Rod and Set the Packer w/3500 Psi-Bled Pressure to 1000 Psi and Attempt to Pull Seal Assembly f/SBR; Pulling Up to 110 Over Pull(300K Indicated) 16:00 17:30 1.50 11,893 111,893COMPZ RPCOM HOSO P Attempt to Pull Out of SBE to Space Out 5'From Fully Located Position- Seal Assembly Came Free w/300 K (Indicated)and 2800 Psi on Pipe- Stand Back 4"DP and Change Elevators to 4%"Tubing 17:30 21:15 3.75 11,893 11,893 COMPZ RPCOM TRIP P M/U 2 Jts 4'h"Tubing and Attempt to Sting Back Into SBE w/Seals (Unable)-Worked Pipe Several Times,With and Without Pumps- Attempt to Rotate 1 1/2 Turns Max due to Control Line and iWire- Unable to Reenter SBE-Conferred w/Anchorage Based Team Members -Decision Made to POOH w/ Completion to Inspect Seals 21:15 21:30 0.25 11,893 11,893 COMPZ RPCOM SFTY T PJSM on Pulling 4'/i'Tubing w/ Control Line and iWire 21:30 22:00 0.50 11,893 11,893 COMPZ RPCOM RURD T R/U to L/D Completion-OWFF (Static) 22:00 23:00 1.00 11,893 11,808 COMPZ RPCOM TRIP T POOH w/4%"Tubing f/11,893'to 11,808'MD-Fluid U-Tubing up Tubing 23:00 00:00 1.00 11,808 11,808 COMPZ RPCOM CIRC T Mix and Pump 30 Bbl 10.0 PPG Dry-Job 06/28/2011 POOH LD 4 1/2'completion equipment&tbg-Flow ck-Test casing to 3500 psi for 10 min to test packer- RU HES slick line-Pull packer setting rod/ball assmebly-MU&RIH w/assembly to pull RHC plug 00:00 12:30 12.50 11,808 0 COMPZ RPCOM PULD T ,POOH w/4'/z"Tubing f/11,808'MD 0'-Laid down Completion tubing and equipment **Lost in hole 5 small screw heads sheared off of I wire retainer tabs on GLM's and 1 SS band Inspection of seal assembly displayed obvious junk in hole damage across both seal packages of assembly-numerous-1/8"wide vertical striations 12:30 13:30 1.00 0 0 COMPZ RPCOM PRTS T Flow check well,static-RU and test casing and packer to 3500 psi for 30 minutes,good 13:30 14:30 1.00 0 0 COMPZ RPCOM PULD T Clean up rig floor-clear tools from floor-Function test BOPE. 14:30 17:30 3.00 0 0 COMPZ RPCOM OTHR T Develop plan forward with Drilling and Completion engineers- 1600 hrs- Notified HES Slick line to Mobilise to rig 17:30 17:45 0.25 0 0 COMPZ RPCOM SFTY T PJSM with HES and drilling crew 17:45 19:00 1.25 0 0 COMPZ RPCOM SLKL T RU to RIH with HES slickline Page 45 of 49 Time Logs Date From To Dur S. Depth E. Depth Phase Code Subcode T Comment 19:00 00:00 5.00 0 0 COMPZ RPCOM SLKL T RIH w/wireline assembly to recover packer seting ball/rod assembly-1st run unsuccessful-Change over-shot guide&RIH-Worked over fish- POOH w/wireline-Recovered ball/rod assembly-Made up fishing tool to recover RHC plug&RIH 06/29/2011 MU&RIH w/assembly to pull RHC plug, RD slickline, PJSM, RU then MU/RIH w/seal assembly(dummy run), locate top of PBR @ 11814',circulate out corrosion inhibited brine, no go into PBR @ 11832'mule shoe depth, POOH LD dummy run BHA, PJSM, Run 4-1/2"completion to 722'. 00:00 01:45 1.75 0 0 COMPZ RPCOM SLKL T Made up fishing tool to recover RHC plug&RIH, POOH-no recovery. 01:45 02:15 0.50 0 0 COMPZ RPCOM SLKL T Cut 200'of slick line, rehead. 02:15 04:00 1.75 0 0 COMPZ RPCOM SLKL T RIH w/toolstrinq to recover RHC plug, POOH w/RHC plug body. 04:00 04:15 0.25 0 0 COMPZ RPCOM SLKL T PJSM,then rig down HES slick line. 04:15 04:45 0.50 0 0 COMPZ RPCOM RURD T PJSM,then RU tongs 04:45 05:45 1.00 0 247 COMPZ RPCOM PULD T PU/MU/RIH w/BHA(Dummy run seal assembly w/full mule shoe. (2) boot baskets,and string magnet to 247' 05:45 11:00 5.25 247 11,791 COMPZ RPCOM TRIP T RIH w/BHA,fill pipe every 20 stands to 11791'. 11:00 11:15 0.25 11,791 11,814 COMPZ RPCOM CIRC T Locate top of PBR w/dummy seal run on 4"drill pipe. Depth of 11814'. Pumping 2 bpm w/120 psi. Pressured up once mule shoe entered PBR. Shut down pump, pick up 2'above top of PBR. 11:15 13:00 1.75 11,814 11,814 COMPZ RPCOM CIRC T PJSM,then displace well w/40 bbls vis brine,followed w/clean brine to displace out the corrosion inhibited brine from well. Pumping 5 bpm w/ 700 psi. PU wt 227k, SO wt 160k. 13:00 13:45 0.75 11,814 11,832 COMPZ RPCOM TRIP T Work string down into PBR f/11812' to 11,832'to locate top of PBR w/ locator sub. 13:45 20:30 6.75 11,832 0 COMPZ RPCOM TRIP T Blow down TD-Flow ck(slight fluid drop) POOH f/11,832'on TT-LD BHA&seal assembly-Flow ck (static) 20:30 21:45 1.25 0 0 COMPZ RPCOM RURD T Clean up&clear for of BHA tools- LD seal assembly 21:45 22:00 0.25 0 0 COMPZ RPCOM SFTY T Held PJSM with crew on running 4 1/2"completion Page 46 of 49 Time Logs Date From To Dur S. Depth E. Depth Phase Code Subcode T Comment 22:00' 00:00 2.00 0 722 'COMPZ RPCOM RCST T Ran 4 1/2"completion as follows: _ Baker PBR Seal assembly(with seals removed) 1 jt 4 1/2"12.6#L-80 IBT-Mod tbg(with centralizer 3'up f/ pin end)-HES XN nipple(w/RHC plug installed)-1 jt 4 1/2"12.6#L-80 IBT-Mod.tbg-Paker Premier packer assmebly-2 jts.4 1/2"12.6#L-80 IBT-Mod.tbg-Camco GLM(KBG-2 w/dummy valve) 10 jts 4 1/2"12.6# L-80 IBT-Mod tbg-Camco SGM- N PG-CA gauge assembly to 722.28' 06/30/2011 Con't to run 4-1/2"compl f/722'to 11751', MU(2)30'joints w/a XT-39 x-o to pump&locate PBR. Slack off approx 18', PU to 11814',spot 20 bbls of corr inhibited brine to annulus, Space out,pull wear bushing,MU hanger,terminate lines, land hanger,set TWC,test seals to 250 and 5000 psi, pull TWC. Drop ball and rod, RU lines and manifold.Test tubing to 3500 psi f/30 minutes, bleed to 2300 psi,test annulus to 3500 psi f/30 minutes, bleed tubing to shear valve in GLM @ 8118.78'. 00:00 12:00 12.00 722 9,781 COMPZ RPCOM RCST T Continue to run 4-1/2"12.6 ppf L-80 IBT-m completion per detail f/722'to 9781'(BP-6i nipple made up and testing 1/4"control line to 5000 psi). 12:00 14:15 2.25 9,781 11,751 COMPZ RPCOM RCST T Continue to run 4-1/2"12.6 ppf L-80 IBT-m completion per detail f/9781' to 11751'. 14:15 15:30 1.25 11,751 11,814 COMPZ RPCOM RCST T Make up(2)30'joints of 4-1/2"IBT-m tubing w/x-o on top to XT-39 to be able to pump and locate top of PBR @ 11814'.Tag PBR on depth. Locate @ 11814'. Pick up to 11814'. 15:30 16:45 1.25 11,814 11,814 COMPZ RPCOM CIRC T PJSM,then spot 20 bbls of inhibited brine on the backside of tubing. Pump 3 bpm w/210 psi,follow with 185 bbls of brine. 16:45 18:15 1.50 11,814 11,814 COMPZ RPCOM HOSO T Determine space out w/full joints of tubing(No space out pups). Make up retrieving tool,then pull FMC wear bushing. 18:15 20:00 1.75 11,814 11,822 COMPZ RPCOM HOSO T Make up tubing hanger,terminate control lines. Drain stack,slack off and land hanger. PU wt 190k, SO wt 127k. Blocks 72k. 20:00 21:30 1.50 11,822 11,822 COMPZ DRILL PRTS P Set TWC.Test hanger and seals to 250 psi f/5 minutes,then 5000 psi f/ 10 minutes. Chart test. Pull TWC. 21:30 00:00 2.50 11,822 11,822 COMPZ DRILL PRTS P Drop ball and rod. Rig up hard lines and manifold on floor. PJSM. Pressure test manifold and lines to 3500 psi. Set packer per Baker. Hold 3500 psi f/30 minutes on tubing. Bleed pressure on tubing to 2300 psi.Test annulus to 3500 psi f/30 minutes. Bile tubing pressure to shear vlave in GLM @ 8118.78'. Sheared w/2500 psi differential. Chart all tests. Page 47 of 49 Time Logs Date From To Dur S. Depth E. Depth Phase Code Subcode T Comment 07/01/2011 24 hr Summary Bleed tubing to shear valve in GLM @ 8118.78'.-RU &test TWC in direction of flow to 2550 psi-RU hard line&manifold-ND BOP stack-Terminate control line&gauge I wire through wellhead-NU&test tree to 5000 psi-RU &pumped 71 bbls diesel for freeze protect-RD lines-Secure well-LD 4"DP for rig move- Clean up after MOBM-Release rig _ 00:00 00:45 0.75 COMPZ RPCOM DHEQ P Lay down landing joint.Set two way check.Test by pumping into the annulus, pressure to 2500 psi f/10 minutes.Chart test. 00:45 01:15 0.50 COMPZ RPCOM OWFF P Monitor well-ok. Rig down hardline and manifold. 01:15 02:15 1.00 COMPZ RPCOM OTHR P Make up stack washing tool. Flush stack. Function rams. 02:15 04:30 2.25 COMPZ WELCTI NUND P Nipple down BOPE. Blow down kill and choke lines.Change out saver sub on the top drive. 04:30 06:30 2.00 COMPZ WELCTI NUND P Terminate control line and"I wire". Install API Ring. Nipple up FMC tree. Note: Final reading @ 0630 hrs on"I wire:3316 psi, 148.7 deg temperature. 06:30 07:00 0.50 COMPZ WELCTL DHEQ P Test void to 5000 psi f/10 minutes- good.Witness of test by rig supervisor. 07:00 07:30 0.50 COMPZ WELCTI DHEQ P Fill tree.Test tree to 5000 psi f/10 minute-chart test. 07:30 07:45 0.25 COMPZ RPCOM RURD P Rig down f/testing. Rig up. 07:45 08:00 0.25 COMPZ RPCOM OTHR P Pull TWC. 08:00 08:15 0.25 COMPZ RPCOM SFTY P PJSM,rig up hardline for freeze protection. 08:15 08:30 0.25 COMPZ RPCOM PRTS P PJSM, Dowell pump 2 bbls,then test lines to 2500 psi. 08:30 09:15 0.75 COMPZ RPCOM FRZP P Dowell pump @ 2 bpm, initial 600 psi,final 1140 psi. Pumping down tubing taking returns to pits f/ annulus. Monitor returns, 1:1 returns.Pumped 71 bbls into well. Depth when equalized would be 2100'MD,2002'TVD. 09:15 10:30 1.25 COMPZ RPCOM OTHR P "U"tube diesel f/tubing to the annulus. Immediate pressure on both tubing and annulus was 300 psi. Final pressure of 160 psi on tubing, 180 psi on annulus. Shut in both tubing and annulus. 10:30 11:15 0.75 COMPZ RPCOM RURD P Bleed pressure f/lines, blow down lines,suck lines. Rig down manifold and lines. 11:15 12:00 0.75 COMPZ WELCTI FRZP P Rig up lubricator, install BPV. Remove double valves on OA and IA. Pressure prior to setting BPV was 110 psi on tubing. Rig down lubricator, install cap w/guage, close master and swab valve. Install guage on OA, read 50 psi. Install guage on IA, read 50 psi. Secure well. Page 48 of 49 Time Logs Date From To Dur S. Depth E. Depth Phase Code Subcode T Comment 12:00 12:15 0.25 COMPZ RPCOM SFTY P PJSM on laying down drill pipe 12:15 20:00 7.75 COMPZ RPCOM PULD P Install mouse hole-Lay down 66 stds 4'drill pipe f/derrick via mouse hole for rig move 20:00 21:00 1.00 COMPZ RPCOM OTHR P PJSM-Pulled mouse hole-Moved Iron roughneck&remove rotary table cover 21:00 23:30 2.50 COMPZ RPCOM OTHR P Clean up from MOBM 23:30 00:00 0.50 COMPZ RPCOM OTHR P Install rotary cover-move iropn roughneck back into postion. Released rig @ 2359 hrs. 7/1/2011 - Move to CD4-210A Page 49 of 49 HALLIBURTON I Sperry Drilling WELL LOG TRANSMITTAL To: State of Alaska July 11, 2011 Alaska Oil and Gas Conservation Commission Attn.: Howard Okland 333 West 7th Avenue,Suite 100 Anchorage,Alaska 99501-3539 RE: MWD Formation Evaluation Logs: CD4-208A+PB1 AK-MW-0008065746 CD4-208A PB1 50-103-20517-71 2" x 5" MD GR/RES Logs: 1 Color Log 2" x 5"TVD GR/RES Logs: 1 Color Log CD4-208A 50-103-20517-01 2" x 5" MD GR/RES Logs: 1 Color Log 2" x 5"ND GR/RES Logs: 1 Color Log Digital Log Images & LWDG-formatted LIS Data w/verification listing(s): 1 CD (c-4 c-f y 1 PLEASE ACKNOWLEDGE RECEIPT BY SIGNING AND RETURNING A COPY OF THE TRANSMITTAL LETTER TO THE ATTENTION OF: Sperry Drilling Attn: Buster Bryant 6900 Arctic Blvd. Anchorage,Alaska 99518 Office: 907-273-3539 Fax: 907-273-3535 Buster.Bryant@halliburton.com Daten?2 ALL( ektSigned: / — C. 63 Page 1 of 1 Schwartz, Guy L (DOA) From: Schwartz, Guy L(DOA) Sent: Tuesday, July 05, 2011 11:25 AM To: 'Hunt, Hai L' Subject: RE: CD4-208A(PTD#211-060): Stacked packer Hai, No issues here with the new completion. I know you are glad to be off the well. Guy Schwartz Senior Petroleum Engineer AOGCC 793-1226 (office) 444-3433 (cell) From: Hunt, Hai L [mailto:Hai.L.Hunt@conocophillips.com] Sent: Tuesday, July 05, 2011 11:14 AM To: Schwartz, Guy L (DOA) Subject: CD4-208A(PTD#211-060): Stacked packer Guy, To follow up on our last phone conversation (-6/28), the seal assembly from the first upper completion run in CD4-208A came up badly scored so we good reason to suspect the PBR was also damage and decided to stack a packer in CD4-208A. We decided to not run a PBR with the second completion run because of the trouble we had stabbing back into the first PBR (both with the first upper completion run and a subsequent drift run on drill pipe). The second upper completion was run on 7/1 and the rig moved off on 7/2. I updated the schematic (attached)this morning to reflect the changes. Please let me know if you have any questions or concerns. Thanks -Hai Hai Hunt Completion Engr ConocoPhillips Alaska, Inc. Office:(907)263-4674 Cell: (907)317-6342 Email: Hai.L.Hunt@ConocoPhillips.com 7/5/2011 ( A pro 7-11- p60 CD4-2O8A As Drilled.7/5/2011 7-5--0 16"65#H-40 Welded MD TVD A lw Conductor to 114' Upper Completion: 1)4'/2 Camco BP-6i(5.591"OD) (27°) 2051' 1959' 3.813 DB Profile with''/ control line to surface. Cannon Cross-coupling clamps on every joint _ WRDP-2-LO SSSV to be run off rig sssvill O '*BP-6i profile will be run with isolation sleeve w/DB lock;min ID=2.25" 2)4-1/2 x 1 Camco KBG-4-5 GLM w/DV(51°) 3863' 3442' 9-5/8"40 ppf L 80 BTC 3)4-1/2 x 1 Camco KBG-4-5 GLM w/DCK-2(65°) 8118' 5618' 4/11 ILPinned for 2500 psi casing to tbg shear Surface Casing 4)Camco 4'/ Gauge Mandrel L-80 (64°) 11135' 6915' Calculated GL � O @ 2594.51'MD/ surface TVD w/Sapphire digital Pressure and Temperature Top of Cement cemented to surface gauge Connected to surface with'/ x 0.035" 4556'MD/3832' Encapsulated I-Wire - Cannon Cross-coupling clamps on every joint Top Qannik 5)4-1/2 x 1 Camco KBG-2 GLM w/DV(66°) 11578' 7108' 5028'MD/ 6)Baker 4.5"x 7"Premier Packer (66°) 11688' 7154' 4086 TVD1 ` Halliburton Stage Collar 7)HES XN 3.813"(3.725"NoGo) (65°) 11750' 7180' Base Qannik 0 0 0 5605'MD/4401'TVD To be run w/RHC plug body 5085'MD/ l ( 8) Baker Slick seal assy(no seal elements) 11804 7203' 4117'TVD w/full mule shoe(64°) Middle Completion: 9)Baker 80-47 Polished Bore Receptacle (64°) 11814' 7207 (seal bore is damaged) 10)Baker 4.5"x 7"Premier Packer (64°) 11847' 7222' 11)HES XN 3.813"(3.725"NoGo) (64°) 11909' 7249' G_ J O To be run w/RHC plug body 12) Baker locating stinger asst'w/fluted WLEG 11953 7268' 4-1/2" 12.6#L-80 IBT-M tubing Lower Completion: run with Jet Lube Run'n'Seal pipe dope 13)HRD Sleeve w/10'tie back extension(64°) 11966' 7274' 14)Baker 5"x7"Flexlock Liner Hanger(65°) 11979' 7280' 15)XO 4-'/ 12.6#L-80 SLHT Box x 11991 7285' 4-'/ 12.6#L-80 IBT-M pin 4 16)4-'/2 12.6#L-80 IBT-M Liner w/ 11996' 7287' Calculated •.• Q O Weatherford spiral centralizers on bottom two joints Top of Cement O 17)4-'/2 12.6#L-80 IBT-M wireline entry guide 14407' 7413' 9070'MD/ 6018'TVD sO Top Nanuq tk � 0 / 9493'MD/ 0 0 6198'TVD 'yi �1 0,72\ CD 40.. Base Nanuq ..- ._, �1 is 9837'MD/ -Tr vp.d.. A 000 6343'TVD 4 n nn, Top Kuparuk C 11493'MD/7071'TVD % till' J iiiii Top Alpine C ! 6-1/8 Hole,TD at 12157'MD/7352'TVD at 19127 MD/ 7"26#L-80 BTC-Mod 4-1/2 12.6#L-80 IBT-M Liner 7441'TVD to 14,407'MD to 12252'MD/7391'TVD Page l of l Schwartz, Guy L (DOA) From: Schwartz, Guy L (DOA) Sent: Friday, June 24, 2011 3:14 PM To: 'Winfree, Michael Alex(Jr.)' Subject: RE: CD4-208A BOPE Test(PTD#211-060) Mike, I agree with your proposal below. With the extensive trouble drilling this well doing the choke manifold test offline will minimize the BOP test period and get you back into the well sooner to run the 4.5" liner. Doing the choke test offline doesn't necessarily move up the start time on the BOP test though. I'm not sure how Mr Regg looks at that .... Normally the start time for the test is when the actual BOP are tested. But this well has some special circumstances. POOH safely (without swabbing) and start the BOP test as soon as possible. Regards, Guy Schwartz Senior Petroleum Engineer AOGCC 793-1226 (office) 444-3433 (cell) From: Winfree, Michael Alex(Jr.) [mailto:Michael.A.Winfree@conocophillips.com] Sent: Friday, June 24, 2011 2:11 PM To: Schwartz, Guy L (DOA) Subject: CD4-208A BOPE Test(PTD# 211-060) Guy, Per our conversation, we are currently pulling out of the hole at 7,000' MD with pumps. Our BOPE test is due today and we anticipate laying down the BHA by 10:00 pm and initiating our BOPE test before midnight. As we pull out of the hole and it becomes likely that we may not make the timing stated above, CPAI proposes initiating the BOPE test on the choke manifold prior to midnight while finishing the trip out of the hole. Once out of the hole and the choke manifold tested, a test plug can be set and the full BOPE test will be performed before running our lower completion. Current timing suggests we will be out of the hole and able to start our test prior to midnight, but since the timing is tight, I wanted to get preapproval to test the choke offline since this will be happening well after business hours. Please let me know if you need additional information regarding this BOPE test. Thanks, -Mike Mike A. Winfree 6/24/2011 CD4-208A Well Plan WP22 Proposed Schematic,6/24/2011 n ' Cv '" ' Fa) 2 11-0(.0 16"65#H-40 Welded Z 1( ha TVD iiiil k Conductor to 114' Upper Completion: 1)4-% Camco BP-6i(5.591"OD) (27°) 2043' 1952' 3.813 DB Profile with% control line to surface. Cannon Cross-coupling clamps on every joint _ WRDP-2-LO SSSV to be run off rig sssv 0 **BP-6i profile will be run with isolation sleeve w/DB lock;min ID=2.25" AM 111. 9-5/8"40 ppf L-80 BTC 2)4-1/2 x 1 Camco KBG-4-5 GLM w/DV(51°) 3852' 3435' Surface Casing Calculated GL O @ 2594.51'MD/2440.39'TVD 3)4-'/ x 1 Camco KBG-4-5 GLM w/DV(65°) 8108' 5615' Top of Cement cemented to surface 4556'MD/3832' 4)Camco 4-/a Gauge Mandrel L-80 (64°) 11082' 6892' w/Sapphire digital Pressure and Temperature Top Qannik gauge Connected to surface with x 0.035" 5028'MD/ Encapsulated I-Wire 4086'ND Halliburton Stage Collar Cannon Cross-coupling clamps on every joint Base Qannik 0 Q 5605'MD/4401'ND 5)4-'/z x 1 Camco KBG-4-5 GLM w/DCK2(64°) 11734' 7174' 5085'MD/ Pinned for 2500 psi casing to tbg shear 4117'TVD • • 6)Baker 80-47 Polished Bore Receptacle (64°) 11805' 7204 • • 7)Baker 4.5"x 7"Premier Packer (64°) 11839' 7219' 8)HES XN 3.813"(3.725"NoGo) (64°) 11901' 7246' To be run w/RHC plug body GL J 0 9) Baker Stinger w/fluted WLEG 11964 7274' • 4-1/2" 12.6#L-80 IBT-M tubing run with Jet Lube Run'n'Seal Lower Completion: pipe dope 9)HRD Sleeve w/10'tie back extension(64°) 11958' 7271' 10)Baker 5"x7"Flexlock Liner Hanger(65°) 11973' 7278' Packer Fluid mix: Calculated • Inhibited Kill weight Brine 11)XO 4-1/2 12.6#L-80 SLHT Box x 11982 7281' Top of Cement with 2000'ND diesel cap 4-'/2 12.6#L-80 IBT-M pin 9070'MD/ • • 6018'ND 12)4-'/ 12.6#L-80 IBT-M Liner w/ 11984' 7282' • • Straight bladed centralizers on bottom two joints • • Top Nanuq 9493'MD/ 0 13)4-'/z 12.6#L-80 IBT-M wireline entry guide 14,398' 7413' 6198'TVD Base Nanuq ©00 0 5o`t( 1 1 ie 9837'MD/ • 4 0� 6343'ND •... t 1i Top Kuparuk C r 11493'MD/7071'TVD uu' J Top Alpine C ' s6aA- 6-1/8 Hole,TD at 12157'MD/7352'ND at 19127 MD/ 7"26#L-80 BTC-Mod 4=/2 12.6#L-80 IBT-M Liner 7441'ND to 14,400'MD to 12252'MD/7391'ND Page 1 of 2 ti Schwartz, Guy L (DOA) From: Schwartz, Guy L(DOA) Sent: Tuesday, June 14, 2011 8:40 AM To: 'Hunt, Hai L' Subject: RE: CD4-208A(PTD#211-060): Change to completion plans Hai, Glad to hear the intermediate casing was successfully landed and cemented. Thanks for the updated schematic .. looks fine as the changes are minor to the proposed plan. Good luck with the lateral section this week. Guy Schwartz Senior Petroleum Engineer AOGCC 793-1226 (office) 444-3433 (cell) From: Hunt, Hai L [mailto:Hai.L.Hunt@conocophillips.com] Sent: Monday, June 13, 2011 5:26 PM To: Schwartz, Guy L (DOA) Subject: RE: CD4-208A(PTD#211-060): Change to completion plans Guy, Slight changes were made to the completion schematic. We are now on Well Plan 22. The packer will be placed -200' lower than planned because the hole angle allows us to do so. Let me know if you have any issues with the new proposed schematic. The 7" casing was run and cemented over the weekend; we are preparing to drill the liner. Thanks -Hai 4ay 11,2011 5:09 PM Oalaska.gov' )8A(PTD#211-060):Change to completion plans Guy, We decided to change the completion plan after not finding a suitable way to pressure test the entire tubing string and PBR using the original plan due to wellbore deviation. The new plan is to run a Baker Premier packer higher up in the hole and tie it to the liner with a long tubing tail. The connection at the liner will not be a hydraulic barrier. Please see attached schematic. « File: CD4-208 WP10 Schematic V.2.0.pdf>> What kind of paperwork do we need to send in to make this change official? Thanks -Hai Hai Hunt Completion Engr ConocoPhillips Alaska,Inc, Office:(907)263-4674 6/14/2011 I z//of C' CD4-2O8A Well Plan WP22 Proposed Schematic c P D,4r- P 6.--/S- /( ' /t-( AI16"65#H-40 Welded MD TVD Conductor to 114' Upper Completion: 1)4-'/2 Camco BP-6i(5.591"OD) (27.7°) 2001' 1915' 3.813 DB Profile I with 1/4 control line to surface. Cannon Cross-coupling clamps on every joint ss'sv0 WRDP-2-LO SSSV to be run off rig BP-6i profile will be run with isolation sleeve w/DB lock;min ID=2.25" Al 16. 9-5/8"40 ppf L-80 BTC Surface Casing 2)4-'/2 x 1 Camco KBG-4-5 GLM w/DV(49.7°) 3796' 3400' Calculated GL O @ 2594.51'MD/2440.39'TVD Top of Cement cemented to surface 3)4-'/2 x 1 Camco KBG-4-5 GLM w/DV(65°) 8072' 5600' 4556'MD/3832' -- 4)4-'/2 x 1 Camco KBG-4-5 GLM w/DCK2(64°) 10940' 6829' Top Qannik Pinned for 2500 psi casing to tbg shear 5028'MD/ 4086'TVD ) Halliburton Stage Collar 5)Camco 4-% Gauge Mandrel L-80 (64°) 11000' 6856' Base Qannik 0 O 0 5605'MD/4401'TVD w/Sapphire digital Pressure and Temperature 5085'MD/ ` [_ gauge Connected to surface with'/ x 0.035" 4117'TVD Encapsulated I-Wire Cannon Cross-coupling clamps on every joint • 6)Baker 80-47 Polished Bore Receptacle (64°) 11166' 6929 7)Baker 4.5"x 7"Premier Packer (64°) 11220' 6953' • • • GL J 0 8)HES XN 3.813"(3.725"NoGo) (64°) 11300' 6988' To be run w/RHC plug body 4-1/2" 12.6#L-80 IBT-M Lower Completion: tubing run with Jet Lube Run'n'Seal • pipe dope 9)HRD Sleeve w/10'tie back extension(64°) 11370' 7019' • • 10)Baker 5"x7"Flexlock Liner Hanger(65°) 11380' 7023' • Packer Fluid mix: 11)-12 x 4-'/2 12.6#L-80 SLHT Perforated Pups Calculated •• Inhibited Kill weight Brine Spaced out every 350'MD Top of Cement with 2000'TVD diesel cap 9070'MD/ a 12)XO 4 12.6#L-80 SLHT Box x 16117 7415' 6018'TVD • OO '/z 4 '/� 12.6#L-80 IBT-M pin • Top Nanuq 13)-8 x 4-'/2 12.6#L-80 SLHT Perforated Pups 9493'MD/ 6198'TVD ' 0 Spaced out every 350'MD Base Nanuq 12)4-1/2 12.6#L-80 IBT-M Orange Peel shoe(89.7°)19103' 7441' 9837'MD/ 41AV Oe 6343'TVD 147-744-- " 00 "t/0pv+tie- '-'4" P 0 Top Kuparuk C .. .. :i :: :i :i :: :• •.. : .. :J 11493'MD/7071'TVD Top Alpine C -350'between 6-1/8 Hole,TD at 12157'MD/7352'TVD perforated pups at 19127 MD/ 7441'TVD 7"26#L-80 BTC-Mod to 12252'MD/7391'TVD 4-1/2 12.6#L-80 SLHT Liner 4-1/2 12.6#L-80 IBT-M Liner From 11380 to 16117'MD From 16118'MD to 19117'MD s h, IRE [-F ArtAsu SEAN PARNELL,GOVERNOR ALASKA OIL AND GAS 333 W.7th AVENUE,SUITE 100 CONSERVATION COMIIIISSIONT ANCHORAGE,ALASKA 99501-3539 PHONE (907)279-1433 FAX (907)276-7542 G. L. Alvord Alaska Drilling Manager ConocoPhillips Alaska, Inc. P.O. Box 100360 Anchorage, AK 99510-0360 c;. 1/ Oaf) Re: Colville River Field, Alpine Oil Pool, CD4-208A ConocoPhillips Alaska, Inc. Permit No: 211-060 (revised) Surface Location: 2918' FNL, 206' FEL, SEC. 24, T11N, R4E, UM Bottomhole Location: 1624' FNL, 2265' FEL, SEC. 06, T1ON, R5E, UM Dear Mr. Alvord: Enclosed is the approved application for permit to re-drill the above referenced development well. This permit to drill does not exempt you from obtaining additional permits or an approval required by law from other governmental agencies and does not authorize conducting drilling operations until all other required permits and approvals have been issued. In addition, the Commission reserves the right to withdraw the permit in the event it was erroneously issued. Operations must be conducted in accordance with AS 31.05 and Title 20, Chapter 25 of the Alaska Administrative Code unless the Commission specifically authorizes a variance. Failure to comply with an applicable provision of AS 31.05, Title 20, Chapter 25 of the Alaska Administrative Code, or a Commission order, or the terms and conditions of this permit may result in the revocation or suspension of the permit. Sincerely, 4 Daniel T. Seamount, Jr. Chair DATED this day of June, 2011. cc: Department of Fish 85 Game, Habitat Section w/o encl. (via e-mail) Department of Environmental Conservation w/o encl. (via e-mail) iCr'V ' 17 __ , , , _,A ! , ,,,„ , , , ., ,,.... ....-, II N 1 3 111 STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMMISSION .,1,00 nil P.; r-; } nmis. uomnMIT TO DRILL 20 AAC 25.005 la.Type of Work: lb.Proposed Well Class: Development-Oil a •Service-Winj ❑ Single Zone a • 1c.Specify if well is proposed for: Drill ❑ Re-drill LJ Stratigraphic Test ❑ Development-Gas ❑ Service-Supply ❑ Multiple Zone❑ Coalbed Gas ❑ Gas Hydrates❑ Re-entry ❑ Exploratory El Service-WAG ❑ Service-Disp ❑ Shale Gas ❑ 2.Operator Name: 5. Bond: U Blanket U Single Well 11.Well Name and Number: ConocoPhillips Alaska,Inc. Bond No. 59-52-180 CD4-208A ' 3.Address: 6.Proposed Depth: 12. Field/Pool(s): P.O.Box 100360 Anchorage,AK 99510-0360 MD: 19114'. TVD: 7441' . Colville River Field 4a. Location of Well(Governmental Section): 7.Property Designation(Lease;"( it Surface:2918'FNL,206'FEL,Sec.24,T11N, R4E,UM ADL 384209,388903,380077, 8004 b Alpine Oil Pool ✓ Top of Productive Horizon: 8.Land Use Permit: 13.Approximate Spud Date: 59'FNL,354'FEL,Sec.36,T11N,R4E,UM 380077 6/1/2011 Total Depth: 9.Acres in Property: 14.Distance to 1624'FNL,2265'FEL,Sec.6,T10N,R5E UM 2560 Nearest Property:>1 mile to CRU boundary 4b.Location of Well(State Base Plane Coordinates-NAD 27): 10.KB Elevation above MSL: .56 feet 15.Distance to Nearest Well Open Surface:x- 378039 y- 5957494 Zone- 4 GL Elevation above MSL: 19.8 feet to Same Pool: CD4-12,1305' 16.Deviated wells: Kickoff depth: 6000 •ft. .17.Maximum Anticipated Pressures in psig(see 20 MC 25.035) Maximum Hole Angle: 93° deg, Downhole:3188 psig , Surface:2452 psig • 18.Casing Program: Specifications Top - Setting Depth -Bottom Cement Quantity,c.f.or sacks Hole Casing Weight Grade Coupling Length MD TVD MD TVD (including stage data) 8.75" 7" 26# L-80 BTC-M 12407' 37' 37' 12444' 7410' 185 sx Class G,560 sx Class G V 6.125" 4.5" 12.6# L-80 IBTM 7914' 11200' 7312' 19114' 7441' liner with blank/perf pups 19 PRESENT WELL CONDITION SUMMARY (To be completed for Redrill and Re-Entry ryOperations) Total Depth MD(ft): Total Depth ND(ft): Plugs(measured) Effective Depth MD(ft): Effective Depth ND(ft): Junk(measured) 11703 7376 Casing Length Size Cement Volume MD TVD Conductor/Structural 77" 16" Pre-installed 114' 114' Surface 2557' 9.625" 530 sx ASLite,230 sx Class G 2594' 2440' Intermediate Production Liner Perforation Depth MD(ft): Perforation Depth TVD(ft): none none 20.Attachments: Property Plat❑ BOP Sketch o Drilling Programa Time v.Depth Plot ❑ Shallow Hazard Analysis ❑ Diverter Sketch❑ Seabed Report ❑ Drilling Fluid Programa 20 AAC 25.050 requirements o 21.Verbal Approval: Commission Representative: J SJl 4.-6.- G-2--R Date: i � 14,4\/ 22. I hereby certify that the foregoing is true and correct. Contact Nina Anderson @ 265-6403 Printed Name G. L. Alvord Title Alaska Drilling Manager Signature } �' /L '1 / Phon 265-6120 Date (0(�/'L,,G1 / Commission Use Only Permit to Drill API Number: Permit Anr•-••i See cover letter � q Number: �� 50/0. '11Sg /� Date: r,f� II for other requirements Conditions of approval: If box is checked,well may not be used to explore for,test,or produce coalbed me`ane,gas hydrates,or gas contained in shales: 2/ �"� ��� 13b �� Samples req'd: Yes ❑ No Mud log req'd: Yes ❑ No 3 Other: J -re-- 25 measures: Yes [I] No [+� Directional svy req'd: Yes j No El Z�oa M.r� K C ) i / / APPROVED BY THE COMMISSION t[/ 6/ ` (/ DATE: I COMMISSIONER Form 10-401 (Revised 7/2009) This permit is lid Cl2R hGolnNdAoLproval(20 AAC 25.005(g) rie. Submit in{duplicate ConocoPhillips Alaska, Inc. `"' Post Office Box 1 ConocoPhillips Anchorage,Alaskaa 995 99510-0360 Telephone 907-276-1215 June 2nd,2011 Alaska Oil and Gas Conservation Commission EC 333 West 7th Avenue, Suite 100 1/ Anchorage,Alaska 99501 iII ,i_01 Re: Request to Revise Permit to Drill#211-060 Maga Gil& Gag Cal6. Commission Dear Sir or Madam: OCl18r go ConocoPhillips Alaska, Inc. hereby applies to revise Permit to Drill number 211-060. On CD4-208A,after reaching casing point at 11,704' MD,the drill string packed off and tight hole conditions were observed on the subsequent wiper trip 4 stands off bottom. The drilling BHA was pulled out of the hole and the attempt to recover the hole v with a clean out assembly was unsuccessful. A sundry was submitted and approved to abandon the wellbore. The 7"intermediate casing shoe lands 1,334' MD away from the original permitted 7"shoe location. The primary reason for the sidetrack is hole instability in the lower shales, but based on the sand observed at the original casing point,the shoe location e- ms was moved southeast to an area expected to have a more favorable sand presence. 44e-- CD4-208A (`CD4-208A is still planned to be a horizontal Alpine C sand producer. The lateral is planned within 500' MD of the original permitted well path. Please find attached the information required by 20 ACC 25.005 (a) and (c) for your review. Pertinent information attached to this application includes the following: 1. Revised Form 10-401 APPLICATION FOR Permit to Drill per 20 ACC 25.005(a). 2. Proposed drilling program changes 3. A drilling fluids program summary 4. Cement Details 5. Directional drilling/collision avoidance information as required by 20 ACC 25.050(b). Information pertinent to the application that is presently on file at the AOGCC: 1. Diagrams of the BOP equipment, diverter equipment and choke manifold lay out as required by 20 ACC 25.035(a)and(b). 2. A description of the drilling fluids handling system. 3. Diagram of riser set up. If you have any questions or require further information, please contact Mike Winfree at 265-6820. Sincerely;, Mike A.Winfree Drilling Engineer Attachments cc: CD4-08 Well File/Sharon Allsup-Drake ATO 1530 Mark Chambers ATO 1566 Liz Galiunas ATO 1500 Mike A.Winfree ATO 1704 Lanston Chin Kuukpik Corporation Alpine : CD4-208A Procedure 1. Pick up 8-3/4"drilling assembly and run in hole 2. Sidetrack off of cement kick off plug with 8-3/4" Drilling assembly at 6,000' MD 3. Drill 8-3/4"hole to 7"casing point in the Alpine B shale at 12,444' MD/7,410'TVD.(LWD Program: GR/RES/ACAL) 4.Run and cement 7"casing as per program. Primary cement job will cover 500' MD above the Nanuq. Cement 2"d stage to cover Qannik. Carry out a leak off test down the 9-5/8" x 7" casing annulus to confirm the fracture pressure referenced to the casing shoe. Freeze protect casing annulus and casing. 5.BOPE test to 3500 psi. The following steps were approved in the original permit to drill and are listed here for reference: 6.PU and RIH with production drilling assembly(LWD Program: GR/RES/PWD/ADR). Pressure test casing to 3500 psi. 7.Drill out and perform formation integrity test to 12.5 ppg EMW. Minimum acceptable leak off for drilling ahead is 11.0 ' ppg EMW. 8.Drill 6-1/8"horizontal section to well TD. 9.Circulate the hole clean and pull out of hole. , 10. Run lower completion of 4 'W', 12.6# L-80 SLHT blank and pre-perforated pup liner and liner hanger and liner top packer. 11. Run upper completion of 4-1/2, 12.6#, L-80 tubing with SSSV DB profile, 3 GLM, XN profile and wireline entry guide. ' Land hanger. 12. Install 2 way check and test and pressure test hanger seals to 5000 psi. Nipple down BOP. ' 13. Install tubing head adapter assembly. Pressure test adapter assembly to 5000 psi. Remove 2 way check. • 14. Drop ball and rod,shear valve in GLM and test tubing and annulus to 3500 psi/30 mins • 15. Circulate tubing to diesel and install freeze protection in the annulus. 16. Set BPV and secure well. Move rig off. Post rig well work will include pulling the ball and rod assembly, and GLV change out. OR ! N t L� DRILLING FLUID PROGRAM 8-3/4" Intermediate Hole Production Hole Section— 6 1/8" Density11.010.0— 10.3 ppg ppg PV 10—25 10 -15 YP 15—25 25-30 Funnel Viscosity Initial Gels 4—8 10-15 10 minute gels <18 12-20 API Filtrate 4— 12 cc/30 min NA HPHT Fluid Loss at 160 (drilling) 12-14 cc/30 min PH 9.0— 10.0 9.0-9.5 KCL 6% Intermediate Hole Section: The intermediate section will be drilled with a fresh water based LSND mud system. Ensure good hole cleaning by pumping regular sweeps and maximizing fluid annular velocity. Maintain mud weight at or 11.0 ppg for lower shale stability. Good filter cake quality, hole cleaning and maintenance of low drill solids (by diluting as required)will all be important in maintaining wellbore stability. Production Hole Section: The horizontal production interval will be drilled with a MOBM drill-in fluid. The fluid will consist of 80/20 OWR. Base oil is LVT-200 mineral oil, the internal phase will consist of 33% w/w CaCl2 brine with emulsifiers and wetting agents. Sized calcium carbonate will be used as a bridging agent for proper filter cake building and fluid loss control. ORIGINAL Cementing Program: 7" Intermediate Casing run to 12,444' MD/7,410' TVD Cement from 12,444' MD to 9,443 +/-' MD (minimum 500' MD above top of Nanuq reservoir) with Class G+ adds @ 15.8 PPG.Assume 40% excess annular volume. Tail: (12,444' —9,443') X 0.1503 ft3/ft X 1.4 (40% excess) = 631 ft3 annular vol. 80' X 0.2148 ft3/ft= 17.2 ft3 shoe joint volume Total volume= 631 + 17.2 = 648 ft3 => 560 Sx @ 1.17 ft3/sk System: 560 Sx Class G+ 0.2% D046 antifoamer, 0.25% D065 dispersant, 0.25% D800 retarder and 0.18%D167 fluid loss additive @ 15.8 PPG yielding 1.17 ft3/sk Second Stage: Cement from ports in a ES stage collar set 500' below the K2 interval to+/- 500' above the K2 interval with Class G+ additives @ 15.8 ppg. Assume 40% excess annular volume Lead: (5,530'- 4,500') X 0.1503 ft3/ft X 1.4 (40% excess) =216 ft3 annular vol. Total Volume=216 ft3=> 185 Sk @ 1.17 ft3/sk System: 214 Sx Class G+ 0.2%D046 antifoamer, 0.3% D065 dispersant and 1% S002 accelerator @ 15.8 PPG yielding 1.17 ft3/sk TR ! GIN ` _ SITAISE AELASEA SEAN PARNELL, GOVERNOR ALASKA OIL AND GAS 333 W.7th AVENUE,SUITE 100 CONSERVATION COMMISSION ANCHORAGE,ALASKA 99501-3539 PHONE (907)279-1433 FAX (907)276-7542 Nina Anderson Alpine Drilling Engineer ConocoPhillips Alaska, Inc. + P.O. Box 100360 Db°t I Anchorage, AK 99510 Re: Colville River Field, Alpine Oil Pool, CD4-208A Sundry Number: 311-187 Dear Ms. Anderson: Enclosed is the approved Application for Sundry Approval relating to the above referenced well. Please note the conditions of approval set out in the enclosed form. As provided in AS 31.05.080, within 20 days after written notice of this decision, or such further time as the Commission grants for good cause shown, a person affected by it may file with the Commission an application for reconsideration. A request for reconsideration is considered timely if it is received by 4:30 PM on the 23rd day following the date of this letter, or the next working day if the 23rd day falls on a holiday or weekend. Sincerely, Daniel T. Seamount, Jr. Chair raJ DATED this 3 day of June, 2011. Encl. GonocoPhillips Alaska, Inc. NOV Post Office Box 100360 Anchorage,Alaska 99510-0360 ConocoPh i I f• ps Telephone 907-276-1215 May 31, 2011 Alaska Oil and Gas Conservation Commission RECEIVED 333 West 7th Avenue, Suite 100 f�''66 `1I Anchorage, Alaska 99501 Re: Sundry : CD4-208A Collapsed Hole Plugback(PTD: 211-060) Alaska Gil&Gag Gans.Commission Dear Sir or Madam: Ancherege ConocoPhillips Alaska, Inc. hereby applies for a sundry permit to plugback the currently approved plan for well CD4-208A(PTD: 211-060). CD4-208A was planned to be a horizontal Alpine C sand producer. The 8-3/4" intermediate hole was sidetracked and drilled to a depth of 11,703' MD/7,376' TVD. Hole conditions required a clean out ran and due to Milluveach instability, the cleanout BHA was unable to reach TD following a pack off event and tight hole conditions. The intermediate hole appears to have collapsed around 10,613' MD which is in the Kalubik shale. The decision was made to pull out of hole and plug back with cement. The new plan is to isolate,CD4-208A with three cement plugs to isolate the Alpine/Kuparuk, and Nanuq reservoirs. An abandonment/kick off plug will be placed on top of an ECP cementing tool at 6,150' MD. Upon isolation the original well, CD4-208A will maintain API: 50-103-20517-01-70 and named CD4-208APB1. The new well,will become CD4-208A(API: 50-103-2517-01-00) Please find attached: • Form 10-403 Application • Plan forward • Proposed final well schematic If you have any questions or require further information, please contact Nina Anderson 265-6403 or Mike A. Winfree at 263-6820. Sincerely, Nina Anders n Drilling Engineer Attachments CC: CD4-208A Well File STATE OF ALASKA 0''I1 RECEIVED ALASKA _AND GAS CONSERVATION COMMISSIL JIJN? 0 1 ?f11 APPLICATION FOR SUNDRY APPROVALS 20 AAC 25.280 Alaska Gil& G8 CrnrK- rO1411460 1.Type of Request: Abandon r Rug for Redrill r Perforate New Pool r Repair well r Change Ametreci.gwram r Suspend r Rug Fbrforations r Perforate r R1II Tubing r Time Ex nsion r Operational Shutdown r Re-enter Susp.Well r Stimulate r Alter casing IT Other: Collapsed Hole PB r v 2.Operator Name: 4.Current Well Class: 5.Permit to Drill Number: ConocoPhillips Alaska, Inc. Development 177 Exploratory r 211060 3.Address: Stratigraphic 1— Service 1' 6.API Number: P. O. Box 100360,Anchorage,Alaska 99510 5010-320-51701-00 7. If perforating,closest approach in pool(s)opened by this operation to nearest property line 8.Well Name and Number: where ownership or landownership changes: Spacing Exception Required? Yes r No 'r CD4-208A 9.Property Designation(Lease Number): 10.Field/Pool(s): ADL 384209,388903,380077,388902,380044 Colville River Field/Alpine Oil Pool 11. PRESENT WELL CONDITION SUMMARY Total depth MD(ft): Total Depth TVD(ft): Effective Depth MD(ft): Effective Depth TVD(ft): Plugs(measured): Junk(measured): 11703 7376 Casing Length Size MD TVD Burst Collapse Structural Conductor 77' 16" 114' 114' Surface 2557 9.625" 2594' 2440' 5750 psi 3090 psi Intermediate Production Liner Perforation Depth MD(ft): Perforation Depth TVD(ft): Tubing Size: Tubing Grade: Tubing MD(ft): 0 0 0 Packers and SSSV Type: Packers and SSSV MD(ft)and TVD(ft) 12.Attachrrents: Description Summary of Proposal r 13. Well Class after proposed work: Detailed Operatiortjs Program r BOP Sketch r Exploratory r Development F Service r 14.Estimated Date for Commencing Operations: 15. Well Status after proposed work: 5/30/2011 Oil F Gas r WDSPL r Suspended 11- 16. 16.Verbal Approval: Date: 05/30/2011 WINJ r GINJ r WAG r Abandoned r Commission Representative: Guy Schwartz GSTOR IT SPLUG r- 17. 17. I hereby certify that the foregoing is true and correct to the best of my knowledge. Contact: Nina Anderson Printed Name Nina Anderson Title: Alpine Drilling Engineer Signature 4402 Phone:ads-00'3 Date 5 -3)`L0// Commission Use Only Sundry Number 1 IJ - f� Conditions of approval: Notify Commission so that a representative may witness ✓ Plug Integrity VL BOP Test IT Mechanical Integrity Test IT Location Clearance r Other: Ajp E i j Tl 5,,Lei ah A - 'tit'4.4 T—ft Subsequent Form Required: t O. _ 4/07 44, ,/( d•,h.. 1.4A-aref 0,4- APPROVED BY Approved by: COMMISSIONER THE COMMISSION Date:‘,/3/1/ FBhfK63 Fos1/< l 0 O R I G I i Y AH L / S bmit in Duplicate (1 ,60le#if // Proposed Plan 1. Pull out of hole with clean out BHA. 2. Pick up 3-1/2" cement stinger and run in hole to +/- 10,409' MD and set 15.8 ppg Class G plug to 9,726' MD (700' plug). 3. Set 2nd 15.8 ppg Class G plug from 9,726' MD to 9,026' MD (700' plug). 4. Set 3rd 15.8 ppg Class G plug from 9,026' MD to 8,326' MD (700' plug). 5. Circulate above plug with 11.7 ppg mud. POOH and wait on cement. 6. RIH and condition upper hole section while waiting on cement. 7. RIH to tag cement plug. Contact state to witness. f 8. POOH. 9. RIH with ECP cementing tool and set at 6,150' MD. 10. Rig up and pump densified 17.0 ppg balance plug for kick off from top of ECP plug to 5,950' MD in the 8-3/4" open hole. (200' plug). 11. Displace plug with mud. 12. Pull out of hole and lay down cement stinger. 13. Pick up drilling BHA to sidetrack and re-drill the intermediate hole section. ru. 14. Continue with permitted operations. CD4 — 208A Intermediate Abandonment Updated May 31, 2011 \ 1111 16" Insulated Conductor to -114' 9-5/8"40 ppf L-80 BTCM Surface Casing 2,594' MD/2,440'TVD Qannik 5028' MD < Top of Kick Off Plug 17.0 ppg';; 5,950'MD/4,535'TVD iffilliKOMMO Plug Willi ECP Cementing Tool < 6,150' MD/4,690'TVD 11.8 ppg Mud < Proposed Top Plug /Tag Depth Nanua Top 8326' MD/5,964 D 8,965' MD/6,189'TVD 1450014 ppg'. 11111111:11piognm #3 Proposed Top Plug#2 9,026' MD/6,341'TVD 158ppg Plu g . :#2wI < Proposed Top Plug#1 9,726' MD/6,715'TVD • 158ppg Plug••••••••, 1,,,,old Kup C Top 1Q627' MD I L091'TVD "_ < Proposed Bottom Plug#1 10,409' MD/7,085'TVD Alp C Top 11,554' MD/7,368' TVD TD 11,703' MD/7,376'TVD Page 1 of 2 Schwartz, Guy L (DOA) From: Schwartz, Guy L (DOA) Sent: Monday, May 30, 2011 8:26 AM To: Robertson, Ryan G Cc: Winfree, Michael Alex(Jr.); Regg, James B (DOA) Subject: Re: CD4-208A Intermediate Abandonment Ryan&Mike, I have reviewed your proposed plugging plan and it meets regulatory requirements as written below. You have verbal approval to proceed. Please submit a 403 sundry as soon as possible. Notify inspectors to witness tag and document displacement vs returns volumes during the cementing operation for inspectors to verify. Regards. Guy Sent from my iPhone On May 29, 2011, at 11:41 PM, "Robertson, Ryan G" <Ryan.G.Robertson@conocophillips.com>wrote: Guy, As per your discussions with Mike Winfree Jr... Shale stability issues in the lower portion of the 8.75" intermediate hole on CD4-208A have prevented forward progress on the well as planned. Initial hole problems occurred on May 26th while tripping out of the hole after TD was reached at 11,703' MD. A subsequent clean out run performed today indicated that the hole could not be recovered past 10,618' MD due to deteriorated hole conditions. As a result, CPAI proposes to abandon the intermediate hole section and sidetrack a new 8.75" intermediate hole. Prior to sidetracking operations, three separate abandonment plugs will be set, with the base of the lowest plug set at 10,618' MD. Each plug is planned to be 700' MD in length, bringing the top of the third plug to 8,518' MD, roughly 450' MD above the top of the Nanuq sand. This sand is the upper most hydrocarbon bearing formation that will be abandoned. The lower Kuparuk C and Alpine C sands will be isolated from above with this series of plugs. After setting the third plug, the cement stinger will be used to confirm final plug height by tagging up after the cement has gained sufficient strength. Once the lower intermediate is abandoned, an ECP cementer will be ran to 5,850' MD, and a kick off plug will be set to allow the well to be sidetracked at 6,000' MD. Please see attached schematic and don't hesitate to call or email with any questions. Thanks, 6/2/2011 Page 2 of 2 Ryan Drilling Engineer 1ConocoPhillips Alaska j Direct: (907)670-4313 [Mobile:(907)950-5107 <CD4-208A - Intermediate Abandonment Schematic - 05.29.11.pdf> 6/2/2011 ConocoPhillips(Alaska) Inc. Western North Slope CD4 Nanuq Pad CD4-208 Plan: CD4-208A Sidetrack at 6000' MD. Build to 65° inc. Hold 148.89° azi through Nanuq target. Turn to 191.4° azi above HRZ. No Plan: CD4-208Awp19dogleg through HRZ. Turn to 200° azi in Kalubik. Hold 65° inc to top of Miluveach. Build to 70° at base of Miluveach, no turning through the Miluveach. Build to 90° through Alpine C and B. Climb at 93° inclination back up to Alpine C at the Heel. Standard Proposal ReportA _4. q..44 01 June, 2011 Permit PacK MADmay_ 2. HALLIBURTON Sperry Drilling Services ORIGINAL Northing (4500 ft/in) iI , iiiIiiiiIiiiiii ilIiiIiIiiiiIiiiiImiIiiiiIiiiiIimIiiiiIiiiiImiIi 'IId - ;I N - C N L 7 U N - m co co N Q Q Q dU _ O .� _ co _ m Q Q - _ m U U 40 17 - . _ _ 4 / _ 0 rn _ rn a - 0 0 C a CO o _ U CO CO N CL ONZOQ co N U M _ r _ 0 oa - - a11 0 U - 0 poE U m GE N - c CO U ir v c o '41/1/411.!� N _ o_ V CM g gc, illiV*.4-10! c.'•J 13 '<i, . 1111101*4111WIP.-10611 ,`vO N r - � Q . U'. 0 Z N '\ va 0 - .. 0 1. U - - m aD • N i _ Q Q � / C� D - Ug - v — U 0 U - ie. Z - 0 - U _ M IftE O M O Z - Q L C Q ,. OV - O - 0 O - c - - O - 0 - 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 i I i i I i I 1 1 1 1 1 1 1 1 1 1 1 1 1 1 I I I I I I 1 1 1 1 1 1 1 1 1 1 1 1 1 I 1 1 1 1 1 1 1 1 1 1 I 1- (uJft 005V) 6ui4LJoN ,33 1 ri-1_,--, 1 NA L 9 eo v 88 nE cne r.n �tJjau� 9 o e no 0,7,2! Ya ��� 95 y QQ 1 I I I L.. I I _.�__ I I l--__-I_. _ I I I I I 1 I I %O M 88 3 '113!1 � 2 Rz 2oo21E2,1 000iYo$ 6 S$$eoo § ';,=. aFm - - ie��gfidg�gdd g8m a 0 4 PYA,IAAIAAAALIAAAP $m.4g $6-gg - 2m _«_«« mwon 9$Qo$rZeZe2mWrnem g ss88W640mmme o i 8sms2aM2n1k2g4Z o; S f y q„� 8 m.888� �pC $ 888S8 8 o -- p rn m p o ff Om ' ° L N ~ p 2 N Zwnyy"kmielri xSR ^G Q O p r o • 2r c r .i rn p - a LLm vn - m o o v 2 - @ prvryvvv:_ g :2 J r JO L1-- ry ; 83� eSF3ae$om� o mi; Sg cp 84 O p • ' WO p J . 8 V ` Nm °IM N O pJ , i . O t p. - m o J p n N M W Nn 1. Cl 8 N OJ - 0 i g O. N• , 7. g C � � i � fp 1 ' ' N . C •. ! ' •S' � � 1 — NN o° ... p IIV O° t. - 8 a 11 ,' ''1 11 ``i ``'1 !1�� •�m O° "'�t _ I 1 I I 1 I I I 1 1 ...1... r. X ii• �g 'o, $ S� mob- - i', °S S I ° • e .rm „ 0, I Rro , a v O It i 00Q a R -, OOO1. mNg $ v 0p _ 1,- V oi o - - p o IIIIIIIIIIIIIIIIIIIIIII 00[6 f g _ 8 8 gggm . ' .06 v c o T. N 3 , (um oost)(+)wow(-)wlos 7 a o N ' — —_ —. N L L`. 1 -------_---- --- - p rn 3 ' 00091. - o 0- ow N ` o Zm _ G G 2 , V _ 4444 Ln n$ qn 777 14 - O N f� 1' `,,', m - - Y 9r1. ! O J we g Fs3ga$8aa 3s — o J N —/ Q II A gwg$t ;nig a. 2 O Y ` N _ - M o m: 0 3 < W a 88 n �R in m N...N `\,``,``, L l m O Q 88 .. o m N p _. N =_— _-- g6. a as o f li °°°° a m- $i E. u r3 N ,Y 1 Tr 3 $m8 ga9E Ym n 1�m3a - nl v_ `° \ __ co s �a'`s PA 'nnns nmrrn�mags - m \osi'•5 moo IS O1 o C V 11 f = W_a fps se m p ° ” --8 '° lig w -;ySg; `mR �'n&mpoomomoe„vWe - 2 ,- i� 1 a g �� 65 'IF, M o L 1 1.y s z Ell o 88888 T48, !88S8r8888 - of v 3 y��� '6 _. §QSP g y� zN1 AAAt6 gg 0...nvee v cnovaoae p T J N \ q/Sg,it Y ' _$ !IP i' 1.1 e^es� e�an n�m� on�$moQm T - c t 111 N f 9e.-e#s �ammmRmniiie - 3 ii 1114 PIM $gn' 3a.C�g1 nn'nnnnmmmeemnnn o N ilii a Z om o el ,1mIqtA ;88`i @ gyvig L`I�£ a ynmoe^oameomn°sg8 _ mm 0 ,d� Iii alb 51. P12 a.i b 'x �3','vmZ�.^�8�n^mn ME3 rn L ti 1.l 'IC .. m80.5 imifi *8 ams. s gnmm mmmr$^na„asl a ro o !� B �8 Upa ayBvpa � - i � m m $— O m rn 1 p 99 _ 'IN ;m m n m o m 1 .I 8 ai .... �Q 'f ao r nmo mr n o M '! 9 _ f'N ovmgn C •nn ry ew:i$'n$n`-n8 Or 8 N II _ i a dni g8g °uik 8$8 p 8 _ _ If i Ch".. - 3 gong 3 mph Vtt �.a. #83w8:29 mm"r o 1- N °S8 A \ ' ` Ignw nTmm 888�m888 _ N.rn 1I�' 11/ Y X! �:.8 e.endggoRMn;33R o I ' I!Ip - am(C175) O m z iD, ' n eme m nnnn�m nm c c a ', ' '1,YYU ( �E �nmve".gn`o rrnrr' 5 . , ` i I ;i it A J • arm <-1 i. N yy Jima OOn�� gy, .%, 1 II .I '�3$a nam n avecY i O ```^-O, i Y1I a — a * g =6nf �g �S^ffi omm$$ 4 r1 yRRR - ���nnn�. ._ o N `\ m i m',I i 0 i./IL� �e Z [n Z$SS� N I 'N Nl!I ! 9 s f ut Fr: Sm .^on nnemm mmmrmwwmm - J , ;rpjt !g „,1111!'B r Q V C a t( I!irY r r L. Rn8 f$easA: Hro _ O = l- 1.W -l.l4i ' D 4 0 esmamaiTmme__n^$°s"a _ Y 3 .al 4z = ;1 V; '1 ,3 .nemm� A..nm<mmr mm97V2a23I r—r- rn I 1 I "1 I I I -I-. 0 4 tW8= I €��_ owl OOOZ)41da4 le3lYan mil ORIGINAL — o 0 U) N O O -O Co N- it mot I O In C ~ 03 6)! eln 4 d OcJ _ o rc -o O 1-0 J csK 00 mer' c o 0 000 0! o0 0 0 0� 0 0 00 `�! `n to 000 'vs0 o 00 00 0 N N 0 ! N- N 0 0 0 O0 OD o ! O O O o O 6' X O N 10 O O O0 �0 Od) N (0 W N N 00 n- X X O `/♦ oo j to T" O) N O O O CO Lo Co N O 'd' 0 U O O _ O —T o O o 0 O O O Co 1 0 o O O O Co o ►n O Lo o N ti O N (ui/U 0052) (+)upoN/(-)umos' LJ GI tL — — — — 0 0 -o Co 6 6dMV80Z-tia3 bbbfi[ -.,r' o 4) 71- 00086 L. 00006 N o ® 4 o N e min vilma 00091. U a) 00096 0 O 0 0 C ° 14000 0 93 0 OOp�6 yr. 13000 0 0 0 0 0 0 000`1 9 00 00001 M ca 000 c 0 0 0006 0 tj aa) u) °s9 0009 0 a) o > 00 _.o I'm ° 6 0c) CL 000 Q 9 00 Os, o _, o 00 O 0004 N o Q oo oco o 0c� I o - - 0 CI N X Co O O O I 1I N O O O O O O O 1 O O O O O O O O O O O O N N co oo 0 (u!/ 000Z) idea lea!ian awl I 10 1 s 0 a § .- 8-I I i I I 1 L L , I I I I I I I I I I I , I I I I , 1 + it i I i I i I I i I i_ 6 - i, a IIA u - " " _ CI (71; a m - 2\s ITT .N Y _ I_ 1,1161.`1/ - ---a ' 00061 - - li _ tl \ 1 II m- II N II - g _ 11 3. N 0 U $$ II --'e2 - li ✓ II 00031 • • I II I II - , II q 00011 - • ,06 _ 8 - c - S 00091 - m - S - 1 II - t0 j 11 I 0 - m N '1 CA a) N iI i3 IA i, i3 m 0 O t U Q m2 1- M I \ 1 M N \ I 9 W O O� D CO CO IG (0' O \1♦ m —q N ,- bi 0 N 7,5 z V _ s w G 0 `, ' N • W N 0 sr m O m \t\ II N _. it _-- O 0 �� 4000 I] - O II\ 0 O -- N \\ li J 11 \\ ` 1 0 `l $ t p iS ss B O \ O II - OLL '1.. 11 S, . 93` 1- 0 00 0 • M 0 c a I r. - -__ - 6 o co'. ° e06 13000 6 u_c O c 8_ 'm o N V J /c Iii" N - E c, O • in C� Z j c F �2t I c w aix CI) 0 0 uel MOW 1^ '1 \ i 1 I •Wang Y IIMIMI Cis t I i1 a it I i a '1 i{ ($SO °y o 1 ----,§: ILI a I t y + COCO N 7 a l l 7 O ® 0S Z Y x II -I I / • Q A I I f f�l� I I a-I� I "`-1 —�I— ` 'I I I I I I I I a 1 1 2 I w (002 Os 1)111d04 fe3gJaA alul ORIGIN L ConocoPhillips HALLIBURTON Standard Proposal Report -1 Database: EDM v16 Prod Local Co-ordinate Reference: Well CD4-208 Company: ConocoPhillips(Alaska)Inc. TVD Reference: Rig:CD4-208 @ 5613f(Doyon 19(19.8+36.3: Project: Western North Slope MD Reference: Rig:CD4-208 @ 56.13ft(Doyon 19(19.8+36.3: Site: CD4 Nanuq Pad North Reference: True Well: CD4-208 Survey Calculation Method: Minimum Curvature Wellbore: Plan:CD4-208A Design: CD4-208Awp19 Project Western North Slope Map System: US State Plane 1927(Exact solution) System Datum: Mean Sea Level Geo Datum: NAD 1927(NADCON CONUS) Using Well Reference Point Map Zone: Alaska Zone 04 Using geodetic scale factor Site CD4 Nanuq Pad Site Position: Northing: 5,957,908.57ft Latitude: 70° 17'36.666 N From: Map Easting: 377,794.25ft Longitude: 150°59'22.031 W Position Uncertainty: 0.00 ft Slot Radius: " Grid Convergence: -0.93° Well CD4-208,Alpine CD4 Well Position +NI-S 0.00 ft Northing: 5,957,492.98 ft Latitude: 70° 17'32.618 N +El-W 0.00 ft Easting: 378,038.29 ft Longitude: 150°59'14.723 W 'Position Uncertainty 0.00 ft Wellhead Elevation: ft Ground Level: 19.80ft Wellbore Plan:CD4-208A Magnetics Model Name Sample Date Declination Dip Angle Field Strength (0) (0) (nT) BGGM2011 5/31/2011 16.08 79.70 57,316 Design CD4-208Awp19 Audit Notes: 'Version: Phase: PLAN Tie On Depth: 6,000.00 Vertical Section: Depth From(TVD) +N/-S +E/-W Direction (ft) (ft) (ft) (0) 36.33 0.00 0.00 154.00 Plan Sections Measured Vertical TVD Dogleg Build Turn Depth Inclination Azimuth Depth System +N/-S +E/-W Rate Rate Rate Tool Face 1 (ft) (0) (0) (ft) ft (ft) (ft) (°/100ft) (°/100ft) (°/100ft) (0) 6,000.00 57.26 190.64 4,613.70 4,557.57 -3,209.79 -266.83 0.00 0.00 0.00 0.00 6,050.00 56.33 190.23 4,641.09 4,584.96 -3,250.93 -274.41 2.00 -1.88 -0.82 -160.00 6,100.00 55.59 188.66 4,669.08 4,612.95 -3,291.80 -281.21 3.00 -1.48 -3.15 -120.00 6,600.00 57.38 167.74 4,947.30 4,891.17 -3,704.67 -267.45 3.50 0.36 -4.18 -90.00 7,053.90 65.02 148.90 5,167.30 5,111.17 -4,070.71 -119.36 4.00 1.68 -4.15 -69.96 9,443.17 65.02 148.90 6,176.13 6,120.00 -5,925.29 999.30 0.00 0.00 0.00 0.00 9,973.38 65.02 148.90 6,400.00 6,343.87 -6,336.84 1,247.54 0.00 0.00 0.00 0.00 10,933.33 65.03 191.40 6,821.13 6,765.00 -7,167.18 1,391.69 4.00 0.00 4.43 99.32 11,248.39 65.03 191.40 6,954.13 6,898.00 -7,447.16 1,335.23 0.00 0.00 0.00 0.00 11,579.52 65.03 200.00 7,094.13 7,038.00 -7,735.77 1,254.11 2.35 0.00 2.60 91.82 12,285.73 70.00 200.00 7,364.13 7,308.00 -8,348.75 1,031.00 0.70 0.70 0.00 0.00 12,785.73 90.00 200.00 7,450.51 7,394.38 -8,809.11 863.44 4.00 4.00 0.00 0.00 12,865.82 93.00 198.87 7,448.42 7,392-29 -8,884.60 836.81 4.00 3.74 -1.41 -20.69 13,255.45 93.00 198.87 7,428.05 7,37192 -9,252.79 710.98 0.00 0.00 0.00 0.00 14,417.37 89.51 152.50 7,401.13 7,345.00 -10,379.57 796.33 4.00 -0.30 -3.99 -93.53 19,113.71 89.51 152.51 7,441.13 7,385.00 -14,545.42 2,964.21 0.00 0.00 0.00 89.96 6/1/2011 1:26:37PM Page 2 COMPASS 2003.16 Build 69 ConocoPhiilips HALLIBURTONJ Standard Proposal Report _ . ,., , Database: EDM v16 Prod Local Co-ordinate Reference: Well CD4-208 Company: ConocoPhillips(Alaska)Inc. TVD Reference: Rig:CD4-208 @ 56.13ft(Doyon 19(19.8+36.3: Project: Western North Slope MD Reference: Rig:CD4-208 @ 56.13ft(Doyon 19(19.8+36.3: Site: CD4 Nanuq Pad North Reference: True Well: CD4-208 Survey Calculation Method: Minimum Curvature Wellbore: Plan:CD4-208A Design: CD4-208Awp19 Planned Survey Measured Vertical Map Map Depth Inclination Azimuth Depth TVDss +Nl-S +E./-W, Northing Easting DLS Vert Section (ft) (°) (°) (ft) ft (ft) (ft) (ft) (ft) 057.57 6,000.00 57.26 190.64 4,613.70 4,557.57 -3,209.79 -266.83 5,954,288.21 377,719.45 0.72 2,767.97 KOP:DLS 2.00 TFO-160.00 6,050.00 56.33 190.23 4,641.09 4,584.96 -3,250.93 -274.41 5,954,247.20 377,711.20 2.00 2,801.62 Start DLS 3.00 TFO-120.00 6,100.00 55.59 188.66 4,669.08 4,612.95 -3,291.80 -281.21 5,954,206.45 377,703.74 3.00 2,835.37 Start DLS 3.50 TFO-90.00 6,200.00 55.66 184.42 4,725.56 4,669.43 -3,373.76 -290.60 5,954,124.66 377,693.01 3.50 2,904.92 6,300.00 55.88 180.19 4,781.84 4,725.71 -3,456.34 -293.93 5,954,042.15 377,688.35 3.50 2,977.69 6,400.00 56.24 176.00 4,837.69 4,781.56 -3,539.22 -291.16 5,953,959.24 377,689.77 3.50 3,053.40 6,500.00 56.74 171.84 4,892.91 4,836.78 -3,622.10 -282.33 5,953,876.23 377,697.26 3.50 3,131.76 6,600.00 57.38 167.74 4,947.30 4,891.17 -3,704.67 -267.45 5,953,793.44 377,710.80 3.50 3,212.50 Start DLS 4.00 TFO-69.97 6,700.00 58.83 163.35 5,000.15 4,944.02 -3,786.85 -246.24 5,953,710.94 377,730.67 4.00 3,295.65 6,800.00 60.42 159.10 5,050.73 4,994.60 -3,868.49 -218.46 5,953,628.86 377,757.12 4.00 3,381.21 6,900.00 62.15 154.98 5,098.79 5,042.66 -3,949.21 -184.23 5,953,547.61 377,790.03 4.00 3,468.76 7,000.00 63.99 151.00 5,144.10 5,087.97 -4,028.60 -143.73 5,953,467.58 377,829.23 4.00 3,557.87 7,053.90 65.02 148.90 5,167.30 5,111.17 -4,070.71 -119.36 5,953,425.08 377,852.91 4.00 3,606.40 7,054.21 65.02 148.90 5,167.43 5,111.30 -4,070.94 -119.22 5,953,424.84 377,853.05 0.00 3,606.68 Start 2389.10 hold at 7054.21 MD 7,100.00 65.02 148.90 5,186.76 5,130.63 -4,106.49 -97.78 5,953,388.96 377,873.91 0.00 3,648.02 7,200.00 65.02 148.90 5,228.99 5,172.86 -4,184.11 -50.96 5,953,310.60 377,919.46 0.00 3,738.31 7,300.00 65.02 148.90 5,271.21 5,215.08 -4,261.73 -4.14 5,953,232.23 377,965.01 0.00 3,828.60 7,400.00 65.02 148.90 5,313.43 5,257.30 -4,339.35 42.68 5,953,153.87 378,010.56 0.00 3,918.89 7,500.00 65.02 148.90 5,355.66 5,299.53 -4,416.97 89.50 5,953,075.50 378,056.11 0.00 4,009.18 7,600.00 65.02 148.90 5,397.88 5,341.75 -4,494.59 136.32 5,952,997.14 378,101.66 0.00 4,099.47 7,700.00 65.02 148.90 5,440.10 5,383.97 -4,572.21 183.14 5,952,918.77 378,147.21 0.00 4,189.76 7,800.00 65.02 148.90 5,482.33 5,426.20 -4,649.83 229.96 5,952,840.41 378,192.76 0.00 4,280.05 7,900.00 65.02 148.90 5,524.55 5,468.42 -4,727.46 276.78 5,952,762.05 378,238.31 0.00 4,370.34 8,000.00 65.02 148.90 5,566.77 5,510.64 -4,805.08 323.60 5,952,683.68 378,283.87 0.00 4,460.63 8,100.00 65.02 148.90 5,609.00 5,552.87 -4,882.70 370.42 5,952,605.32 378,329.42 0.00 4,550.92 8,200.00 65.02 148.90 5,651.22 5,595.09 -4,960.32 417.24 5,952,526.95 378,374.97 0.00 4,641.21 8,300.00 65.02 148.90 5,693.44 5,637.31 -5,037.94 464.06 5,952,448.59 378,420.52 0.00 4,731.50 8,400.00 65.02 148.90 5,735.67 5,679.54 -5,115.56 510.88 5,952,370.22 378,466.07 0.00 4,821.79 8,500.00 65.02 148.90 5,777.89 5,721.76 -5,193.18 557.70 5,952,291.86 378,511.62 0.00 4,912.08 8,600.00 65.02 148.90 5,820.11 5,763.98 -5,270.81 604.52 5,952,213.50 378,557.17 0.00 5,002.37 8,700.00 65.02 148.90 5,862.34 5,806.21 -5,348.43 651.34 5,952,135.13 378,602.72 0.00 5,092.66 8,780.03 65.02 148.90 5,896.13 5,840.00 -5,410.55 688.81 5,952,072.42 378,639.18 0.00 5,164.92 Albian 97 8,800.00 65.02 148.90 5,904.56 5,848.43 -5,426.05 698.16 5,952,056.77 378,648.27 0.00 5,182.95 8,900.00 65.02 148.90 5,946.78 5,890.65 -5,503.67 744.98 5,951,978.40 378,693.82 0.00 5,273.24 9,000.00 65.02 148.90 5,989.01 5,932.88 -5,581.29 791.80 5,951,900.04 378,739.37 0.00 5,363.53 9,100.00 65.02 148.90 6,031.23 5,975.10 -5,658.91 838.62 5,951,821.68 378,784.93 0.00 5,453.82 9,200.00 65.02 148.90 6,073.45 6,017.32 -5,736.53 885.44 5,951,743.31 378,830.48 0.00 5,544.11 9,300.00 65.02 148.90 6,115.68 6,059.55 -5,814.15 932.26 5,951,664.95 378,876.03 0.00 5,634.40 9,400.00 65.02 148.90 6,157.90 6,101.77 -5,891.78 979.08 5,951,586.58 378,921.58 0.00 5,724.69 671/2011 1:26:37PM Page 3 COMPASS 2003.16 Build 69 OR % GNAL ConocoPhillips HALLIBURTDN Standard Proposal Report Database: EDM v16 Prod Local Co-ordinate Reference: Well CD4-208 Company: ConocoPhiliips(Alaska)Inc. TVD Reference: Rig:CD4-208 @ 56.138(Doyon 19(19.8+36.3: Project: Western North Slope MD Reference: Rig:CD4-208 @ 56.13ft(Doyon 19(19.8+36.3: Site: CD4 Nanuq Pad North Reference: True Well: CD4-208 Survey Calculation Method: Minimum Curvature Wellbore: Plan:CD4-208A Design: CD4-208Awp19 Planned Survey Measured Vertical Map Map Depth Inclination Azimuth Depth TVDss +N/-S +EJ-W Northing Easting DLS Vert Section (ft) (0) (0) (ft) ft (ft) (ft) (ft) (ft) 6,120,00 9,443.17 65.02 148.90 6,176.13 6,120.00 -5,925.29 999.30 5,951,552.75 378,941.24 0.00 5,763.68 Albian 96(Nanuq)-CD4-208A 30May11 Nanuq 9,443.31 65.02 148.90 6,176.19 6,120.06 -5,925.39 999.36 5,951,552.64 378,941.31 0.00 5,763.80 Start 530.24 hold at 9443.31 MD 9,500.00 65.02 148.90 6,200.12 6,143.99 -5,969.40 1,025.90 5,951,508.22 378,967.13 0.00 5,814.98 9,600.00 65.02 148.90 6,242.35 6,186.22 -6,047.02 1,072.72 5,951,429.85 379,012.68 0.00 5,905.27 9,700.00 65.02 148.90 6,284.57 6,228.44 -6,124.64 1,119.54 5,951,351.49 379,058.23 0.00 5,995.56 9,774.74 65.02 148.90 6,316.13 6,260.00 -6,182.66 1,154.54 5,951,292.92 379,092.28 0.00 6,063.05 Nanuq Base 9,800.00 65.02 148.90 6,326.79 6,270.66 -6,202.26 1,166.36 5,951,273.13 379,103.78 0.00 6,085.85 9,900.00 65.02 148.90 6,369.02 6,312.89 -6,279.88 1,213.18 5,951,194.76 379,149.33 0.00 6,176.14 9,973.38 65.02 148.90 6,400.00 6,343.87 -6,336.84 1,247.54 5,951,137.26 379,182.76 0.00 6,242.40 9,973.55 65.02 148.90 6,400.07 6,343.94 -6,336.98 1,247.62 5,951,137.12 379,182.84 0.00 6,242.56 Start DLS 4.00 TFO 99.32 10,000.00 64.86 150.06 6,411.28 6,355.15 -6,357.61 1,259.78 5,951,116.29 379,194.66 4.02 6,266.44 10,100.00 64.31 154.44 6,454.21 6,398.08 -6,437.52 1,301.83 5,951,035.72 379,235.40 4.00 6,356.69 10,200.00 63.89 158.86 6,497.91 6,441.78 -6,520.08 1,337.47 5,950,952.60 379,269.70 4.00 6,446.51 10,300.00 63.61 163.31 6,542.16 6,486.03 -6,604.89 1,366.54 5,950,867.33 379,297.38 4.00 6,535.49 10,400.00 63.47 167.77 6,586.73 6,530.60 -6,691.55 1,388.89 5,950,780.33 379,318.32 4.00 6,623.17 10,500.00 63.46 172.24 6,631.42 6,57529 -6,779.63 1,404.42 5,950,692.02 379,332.42 4.00 6,709.14 10,600.00 63.60 176.70 6,676.01 6,619.88 -6,868.69 1,413.04 5,950,602.83 379,339.60 4.00 6,792.98 10,700.00 63.87 181.14 6,720.28 6,664.15 -6,958.32 1,414.73 5,950,513.20 379,339.83 4.00 6,874.28 10,800.00 64.28 185.56 6,764.02 6,707.89 -7,048.08 1,409.47 5,950,423.55 379,333.11 4.00 6,952.64 10,900.00 64.82 189.95 6,807.00 6,750.87 -7,137.52 1,397.28 5,950,334.33 379,319.47 4.00 7,027.68 10,933.33 65.03 191.40 6,821.13 6,765.00 -7,167.18 1,391.69 5,950,304.76 379,313.40 4.00 7,051.89 HRZ 10,933.51 65.03 191.40 6,821.21 6,765.08 -7,167.35 1,391.65 5,950,304.59 379,313.37 0.00 7,052.03 Start 315.06 hold at 10933.51 MD 11,000.00 65.03 191.40 6,849.27 6,793.14 -7,226.43 1,379.74 5,950,245.72 379,300.50 0.00 7,099.91 11,100.00 65.03 191.40 6,891.49 6,835.36 -7,315.29 1,361.82 5,950,157.16 379,281.14 0.00 7,171.92 11,200.00 65.03 191.40 6,933.70 6,877.57 -7,404.16 1,343.90 5,950,068.61 379,261.79 0.00 7,243.94 11,248.39 65.03 191.40 6,954.13 6,898.00 -7,447.16 1,335.23 5,950,025.76 379,252.42 0.00 7,278.79 HRZ BASE 11,248.57 65.03 191.40 6,954.21 6,898.08 -7,447.32 1,335.20 5,950,025.60 379,252.38 0.00 7,278.92 Start Turn 2.60 11,300.00 65.00 192.74 6,975.93 6,919.80 -7,492.90 1,325.45 5,949,980.18 379,241.90 2.36 7,315.61 11,392.68 64.97 195.15 7,015.13 6,959.00 -7,574.41 1,305.21 5,949,899.02 379,220.34 2.35 7,380.00 K-1 11,400.00 64.97 195.34 7,018.23 6,962.10 -7,580.80 1,303.47 5,949,892.66 379,218.50 2.35 7,384.98 11,500.00 64.98 197.94 7,060.53 7,004.40 -7,667.61 1,277.53 5,949,806.29 379,191.16 2.35 7,451.64 11,572.41 65.02 199.82 7,091.13 7,035.00 -7,729.71 1,256.30 5,949,744.55 379,168.92 2.35 7,498.14 KUP C 11,579.52 65.03 200.00 7,094.13 7,038.00 -7,735.77 1,254.11 5,949,738.53 379,166.63 2.35 7,502.63 LCU 6/1/2011 1:26:37PM Page 4 COMPASS 2003.16 Build 69 ' t ‘ i ` 1 ` ConocoPhillips HALLIBURTON Standard Proposal Report Database: EDM v16 Prod Local Co-ordinate Reference: Well CD4-208 Company: ConocoPhillips(Alaska)Inc. TVD Reference: Rig:CD4-208 @ 56.13ft(Doyon 19(19.8+36.3: Project: Western North Slope MD Reference: Rig:CD4-208 @ 56.13ft(Doyon 19(19.8+36.3: Site: CD4 Nanuq Pad North Reference: True Well: CD4-208 Survey Calculation Method: Minimum Curvature Wellbore: Plan:CD4-208A Design: CD4-208Awp19 Planned Survey Measured Vertical Map Map Depth Inclination Azimuth Depth TVDss +N/-S +E/-W Northing Easting DLS Vert Section (ft) (°) (°) (ft) ft (ft) (ft) (ft) (ft) 7,038.08 11,579.70 65.03 200.00 7,094.21 7,038.08 -7,735.92 1,254.05 5,949,738.37 379,166.57 0.00 7,502.74 Start DLS 0.70 TFO 0.00 11,600.00 65.17 200.00 7,102.75 7,046.62 -7,753.22 1,247.75 5,949,721.17 379,159.99 0.71 7,515.53 11,700.00 65.88 200.00 7,144.18 7,088.05 -7,838.75 1,216.62 5,949,636.17 379,127.48 0.70 7,578.76 11,800.00 66.58 200.00 7,184.49 7,128.36 -7,924.75 1,185.32 5,949,550.70 379,094.80 0.70 7,642.33 11,900.00 67.29 200.00 7,223.67 7,167.54 -8,011.20 1,153.86 5,949,464.77 379,061.93 0.70 7,706.24 12,000.00 67.99 200.00 7,261.71 7,205.58 -8,098.11 1,122.23 5,949,378.40 379,028.90 0.70 7,770.48 12,100.00 68.69 200.00 7,298.62 7,242.49 -8,185.44 1,090.44 5,949,291.61 378,995.70 0.70 7,835.04 12,200.00 69.40 200.00 7,334.39 7,278.26 -8,273.19 1,058.50 5,949,204.39 378,962.35 0.70 7,899.91 12,242.19 69.69 200.00 7,349.13 7,293.00 -8,310.34 1,044.98 5,949,167.47 378,948.23 0.70 7,927.37 ALP D 12,285.73 70.00 200.00 7,364.13 7,308.00 -8,348.75 1,031.00 5,949,129.30 378,933.63 0.70 7,955.77 ALP C 12,285.91 70.00 200.00 7,364.19 7,308.06 -8,348.91 1,030.94 5,949,129.13 378,933.57 0.00 7,955.89 Start DLS 4.00 TFO 0.00 12,294.58 70.35 200.00 7,367.13 7,311.00 -8,356.57 1,028.15 5,949,121.52 378,930.65 4.09 7,961.55 UJU 12,300.00 70.57 200.00 7,368.94 7,312.81 -8,361.37 1,026.41 5,949,116.75 378,928.83 4.00 7,965.10 12,400.00 74.57 200.00 7,398.89 7,342.76 -8,451.01 993.78 5,949,027.66 378,894.76 4.00 8,031.36 12,444.42 76.35 200.00 7,410.04 7,353.91 -8,491.41 979.08 5,948,987.51 378,879.40 4.00 8,061.23 7"x 8-3/4" 12,500.00 78.57 200.00 7,422.11 7,365.98 -8,542.39 960.52 5,948,936.84 378,860.02 4.00 8,098.91 12,600.00 82.57 200.00 7,438.49 7,382.36 -8,635.07 926.79 5,948,844.73 378,824.79 4.00 8,167.43 12,700.00 86.57 200.00 7,447.95 7,391.82 -8,728.60 892.75 5,948,751.77 378,789.24 4.00 8,236.57 12,785.73 90.00 200.00 7,450.51 7,394.38 -8,809.11 863.44 5,948,671.75 378,758.64 4.00 8,296.08 12,785.91 90.00 200.00 7,450.51 7,394.38 -8,809.28 863.38 5,948,671.58 378,758.57 0.00 8,296.21 Start DLS 4.00 TFO-21.10 12,800.00 90.53 199.80 7,450.45 7,394.32 -8,822.53 858.59 5,948,658.41 378,753.56 4.05 8,306.02 12,865.82 93.00 198.87 7,448.42 7,392.29 -8,884.60 836.81 5,948,596.71 378,730.78 4.00 8,352.26 12,866.21 93.00 198.87 7,448.40 7,392.27 -8,884.97 836.68 5,948,596.34 378,730.65 0.00 8,352.54 Start 389.99 hold at 12866.21 MD 12,900.00 93.00 198.87 7,446.63 7,390.50 -8,916.90 825.77 5,948,564.59 378,719.22 0.00 8,376.45 13,000.00 93.00 198.87 7,441.40 7,385.27 -9,011.40 793.48 5,948,470.64 378,685.40 0.00 8,447.23 13,100.00 93.00 198.87 7,436.18 7,380.05 -9,105.90 761.18 5,948,376.69 378,651.58 0.00 8,518.01 13,200.00 93.00 198.87 7,430.95 7,374.82 -9,200.39 728.89 5,948,282.73 378,617.76 0.00 8,588.78 13,255.45 93.00 198.87 7,428.05 7,371.92 -9,252.79 710.98 5,948,230.64 378,599.01 0.00 8,628.03 13,256.21 93.00 198.84 7,428.01 7,371.88 -9,253.51 710.74 5,948,229.93 378,598.76 4.00 8,628.56 Start DLS 4.00 TFO-93.53 13,300.00 92.89 197.09 7,425.76 7,369.63 -9,295.11 697.25 5,948,188.55 378,584.60 4.00 8,660.04 13,400.00 92.63 193.09 7,420.95 7,364.82 -9,391.53 671.26 5,948,092.57 378,557.04 4.00 8,735.31 13,500.00 92.35 189.10 7,416.60 7,360.47 -9,489.55 652.04 5,947,994.89 378,536.24 4.00 8,814.99 13,600.00 92.07 185.10 7,412.74 7,356.61 -9,588.69 639.69 5,947,895.97 378,522.29 4.00 8,898.68 13,700.00 91.78 181.11 7,409.38 7,353.25 -9,688.47 634.28 5,947,796.30 378,515.25 4.00 8,985.98 13,800.00 91.48 177.12 7,406.54 7,350.41 -9,788.39 635.82 5,947,696.37 378,515.17 4.00 9,076.47 13,900.00 91.17 173.13 7,404.23 7,348.10 -9,887.99 644.31 5,947,596.66 378,522.05 4.00 9,169.71 61112011 1:26:37PM Page 5 COMPASS 2003.16 Build 69 nim N ! ; 1 1\ LL II \ t... ConocoPhillips HO,LLIBUPTON Standard Proposal Report Database: EDM v16 Prod Local Co-ordinate Reference: Well CD4-208 Company: ConocoPhillips(Alaska)Inc. TVD Reference: Rig:CD4-208 @ 56.13ft(Doyon 19(19.8+36.3: Project: Western North Slope MD Reference: Rig:CD4-208 @ 56.13ft(Doyon 19(19.8+36.3: Site: CD4 Nanuq Pad North Reference: True Well: CD4-208 Survey Calculation Method: Minimum Curvature Wellbore: Plan:CD4-208A Design: CD4-208Awp19 Planned Survey Measured Vertical Map Map Depth Inclination Azimuth Depth TVDss +NI-S +EJ-W Northing Easting DLS Vert Section (ft) (°) (°) (ft) ft (ft) (ft) (ft) (ft) 7,346.34 14,000.00 90.85 169.14 7,402.47 7,346.34 -9,986.76 659.71 5,947,497.66 378,535.84 4.00 9,265.24 14,100.00 90.53 165.16 7,401.26 7,345.13 -10,084.22 681.94 5,947,399.85 378,556.49 4.00 9,362.59 14,200.00 90.21 161.17 7,400.61 7,344.48 -10,179.92 710.90 5,947,303.71 378,583.89 4.00 9,461.29 14,300.00 89.89 157.18 7,400.52 7,344.39 -10,273.36 746.45 5,947,209.71 378,617.91 4.00 9,560.86 14,400.00 89.57 153.19 7,400.99 7,344.86 -10,364.11 788.40 5,947,118.30 378,658.39 4.00 9,660.82 14,417.37 89.51 152.50 7,401.13 7,345.00 -10,379.57 796.33 5,947,102.72 378,666.06 4.00 9,678.18 CD4-208A 26May11 Heel Sidetrack 14,417.52 89.51 152.50 7,401.13 7,345.00 -10,379.70 796.40 5,947,102.59 378,666.12 0.00 9,678.33 Start 4696.30 hold at 14417.52 MD 14,500.00 89.51 152.50 7,401.83 7,345.70 -10,452.86 834.48 5,947,028.82 378,703.01 0.00 9,760.78 14,600.00 89.51 152.50 7,402.69 7,346.56 -10,541.56 880.65 5,946,939.39 378,747.73 0.00 9,860.74 14,700.00 89.51 152.50 7,403.54 7,347.41 -10,630.26 926.82 5,946,849.96 378,792.45 0.00 9,960.71 14,800.00 89.51 152.50 7,404.39 7,348.26 -10,718.96 972.98 5,946,760.53 378,837.17 0.00 10,060.67 14,900.00 89.51 152.50 7,405.24 7,349.11 -10,807.66 1,019.15 5,946,671.10 378,881.89 0.00 10,160.63 15,000.00 89.51 152.50 7,406.09 7,349.96 -10,896.36 1,065.32 5,946,581.67 378,926.61 0.00 10,260.59 15,100.00 89.51 152.50 7,406.94 7,350.81 -10,985.07 1,111.49 5,946,492.24 378,971.33 0.00 10,360.56 15,200.00 89.51 152.50 7,407.80 7,351.67 -11,073.77 1,157.65 5,946,402.81 379,016.05 0.00 10,460.52 15,300.00 89.51 152.50 7,408.65 7,352.52 -11,162.47 1,203.82 5,946,313.38 379,060.76 0.00 10,560.48 15,400.00 89.51 152.50 7,409.50 7,353.37 -11,251.17 1,249.99 5,946,223.94 379,105.48 0.00 10,660.44 15,500.00 89.51 152.50 7,410.35 7,354.22 -11,339.87 1,296.15 5,946,134.51 379,150.20 0.00 10,760.40 15,600.00 89.51 152.51 7,411.20 7,355.07 -11,428.57 1,342.32 5,946,045.08 379,194.91 0.00 10,860.37 15,700.00 89.51 152.51 7,412.05 7,355.92 -11,517.28 1,388.48 5,945,955.65 379,239.63 0.00 10,960.33 15,800.00 89.51 152.51 7,412.91 7,356.78 -11,605.98 1,434.65 5,945,866.22 379,284.35 0.00 11,060.29 15,900.00 89.51 152.51 7,413.76 7,357.63 -11,694.68 1,480.81 5,945,776.79 379,329.06 0.00 11,160.25 16,000.00 89.51 152.51 7,414.61 7,358.48 -11,783.38 1,526.98 5,945,687.35 379,373.78 0.00 11,260.22 16,100.00 89.51 152.51 7,415.46 7,359.33 -11,872.09 1,573.14 5,945,597.92 379,418.49 0.00 11,360.18 16,200.00 89.51 152.51 7,416.31 7,360.18 -11,960.79 1,619.30 5,945,508.49 379,463.21 0.00 11,460.14 16,300.00 89.51 152.51 7,417.16 7,361.03 -12,049.49 1,665.46 5,945,419.05 379,507.92 0.00 11,560.10 16,400.00 89.51 152.51 7,418.02 7,361.89 -12,138.20 1,711.63 5,945,329.62 379,552.63 0.00 11,660.07 16,500.00 89.51 152.51 7,418.87 7,362.74 -12,226.90 1,757.79 5,945,240.19 379,597.35 0.00 11,760.03 16,600.00 89.51 152.51 7,419.72 7,363.59 -12,315.60 1,803.95 5,945,150.75 379,642.06 0.00 11,859.99 16,700.00 89.51 152.51 7,420.57 7,364.44 -12,404.31 1,850.11 5,945,061.32 379,686.77 0.00 11,959.95 16,800.00 89.51 152.51 7,421.42 7,365.29 -12,493.01 1,896.27 5,944,971.89 379,731.48 0.00 12,059.92 16,900.00 89.51 152.51 7,422.28 7,366.15 -12,581.72 1,942.43 5,944,882.45 379,776.20 0.00 12,159.88 17,000.00 89.51 152.51 7,423.13 7,367.00 -12,670.42 1,988.59 5,944,793.02 379,820.91 0.00 12,259.84 17,100.00 89.51 152.51 7,423.98 7,367.85 -12,759.12 2,034.75 5,944,703.58 379,865.62 0.00 12,359.80 17,200.00 89.51 152.51 7,424.83 7,368.70 -12,847.83 2,080.91 5,944,614.15 379,910.33 0.00 12,459.77 17,300.00 89.51 152.51 7,425.68 7,369.55 -12,936.53 2,127.07 5,944,524.71 379,955.04 0.00 12,559.73 17,400.00 89.51 152.51 7,426.53 7,370.40 -13,025.24 2,173.23 5,944,435.28 379,999.75 0.00 12,659.69 17,500.00 89.51 152.51 7,427.39 7,371.26 -13,113.95 2,219.39 5,944,345.84 380,044.46 0.00 12,759.65 17,600.00 89.51 152.51 7,428.24 7,372.11 -13,202.65 2,265.55 5,944,256.41 380,089.17 0.00 12,859.62 17,700.00 89.51 152.51 7,429.09 7,372.96 -13,291.36 2,311.71 5,944,166.97 380,133.88 0.00 12,959.58 17,800.00 89.51 152.51 7,429.94 7,373.81 -13,380.06 2,357.86 5,944,077.54 380,178.58 0.00 13,059.54 17,900.00 89.51 152.51 7,430.79 7,374.66 -13,468.77 2,404.02 5,943,988.10 380,223.29 0.00 13,159.50 18,000.00 89.51 152.51 7,431.64 7,375.51 -13,557.48 2,450.18 5,943,898.66 380,268.00 0.00 13,259.47 6/1/2011 1:26:37PM Page 6 COMPASS 2003.16 Build 69 r" 1 ', l A.. ConocoPhillips HHALLIBURTON Standard Proposal Report Database: EDM v16 Prod Local Co-ordinate Reference: Well CD4-208 Company: ConocoPhillips(Alaska)Inc. ND Reference: Rig:CD4-208 @ 56.13ft(Doyon 19(19.8+36.3: Project: Western North Slope MD Reference: Rig:CD4-208 @ 56.13ft(Doyon 19(19.8+36.3: Site: CD4 Nanuq Pad North Reference: True Well: CD4-208 Survey Calculation Method: Minimum Curvature Wellbore: Plan:CD4-208A Design: CD4-208Awp19 Planned Survey Measured Vertical Map Map Depth Inclination Azimuth Depth TVDss +N/-S +E/-W Northing Easting DLS Vert Section (ft) (°) (°) (ft) ft (ft) (ft) (ft) (ft) 7,376.37 18,100.00 89.51 152.51 7,432.50 7,376.37 -13,646.18 2,496.33 5,943,809.23 380,312.71 0.00 13,359.43 18,200.00 89.51 152.51 7,433.35 7,377.22 -13,734.89 2,542.49 5,943,719.79 380,357.42 0.00 13,459.39 18,300.00 89.51 152.51 7,434.20 7,378.07 -13,823.60 2,588.65 5,943,630.35 380,402.12 0.00 13,559.35 18,400.00 89.51 152.51 7,435.05 7,378.92 -13,912.30 2,634.80 5,943,540.92 380,446.83 0.00 13,659.32 18,500.00 89.51 152.51 7,435.90 7,379.77 -14,001.01 2,680.96 5,943,451.48 380,491.53 0.00 13,759.28 18,600.00 89.51 152.51 7,436.75 7,380.62 -14,089.72 2,727.11 5,943,362.04 380,536.24 0.00 13,859.24 18,700.00 89.51 152.51 7,437.61 7,381.48 -14,178.43 2,773.27 5,943,272.61 380,580.94 0.00 13,959.20 18,800.00 89.51 152.51 7,438.46 7,382.33 -14,267.13 2,819.42 5,943,183.17 380,625.65 0.00 14,059.17 18,900.00 89.51 152.51 7,439.31 7,383.18 -14,355.84 2,865.57 5,943,093.73 380,670.35 0.00 14,159.13 19,000.00 89.51 152.51 7,440.16 7,384.03 -14,444.55 2,911.73 5,943,004.29 380,715.06 0.00 14,259.09 19,100.00 89.51 152.51 7,441.01 7,384.88 -14,533.26 2,957.88 5,942,914.85 380,759.76 0.00 14,359.06 19,113.71 89.51 152.51 7,441.13 .7,385.00 -14,545.42 2,964.21 5,942,902.59 380,765.89 0.00 14,372.76 CD4-208A 26May11 Toe Targets Target Name -hit/miss target Dip Angle Dip Dir. ND +N/-S +E/-W Northing Easting -Shape (°) (°) (ft) (ft) (ft) (ft) (ft) CD4-208A 30May11 Nanuq 0.00 0.00 6,176.13 -5,925.29 999.30 5,951,552.75 378,941.24 -plan hits target center -Point CD4-208A 26May11 Toe 0.00 0.00 7,441.13 -14,545.42 2,964.21 5,942,902.59 380,765.89 -plan hits target center -Circle(radius 100.00) CD4-208A31May11 Nanuq 0.00 0.00 6,176.13 -6,264.40 1,211.50 5,951,210.27 379,147.90 -plan misses target center by 169.01ft at 9805.75ft MD(6329.22 TVD,-6206.72 N, 1169.05 E) -Point CD4-208A 26May11 Heel Sidetrack 0.00 0.00 7,401.13 -10,379.57 796.33 5,947,102.72 378,666.06 -plan hits target center -Circle(radius 100.00) 2,594.51 2,440.39 9 5/8"x 12 1/4" 9-5/8 12-1/4 12,444.42 7,410.04 7"x 8-3/4" 7 8-3/4 19,113.82 4-1/2"x 6-1/8" 4-1/2 6-1/8 611/2011 1:26:37PM Page 7 COMPASS 2003.16 Build 69 UIG1NAL ili 2 N m 0L I-. % CC in as W 'L 1 o Q Of coCLI to m Z isi CD 0N ' o m a) • 0a UC a N �C � o cn w N 3 cn d U N N — a rn a o m _ o w o 0 0 N O EJ O ......., — v `�' m ' r o o ' = + Z Q r� o V/ O M (N al al t «6 a7 N M 6 C al0 aa)i U 0 o s y 3 iliCt Wi °O ti 4= a .. E. in n ' O U N H1il cc a W E cuvo m V. a) rnH 110 Q VI I ♦ Cl) Z N N Q O J Or v ■ O ti V' O ,o 0-6 LL i s O Q L - - - a66 o N- -- J cp V Z = .t L RS O `— � � �'ifi °' O - Ummo Q '+ r Z a) O N LL O = = 000 op 0 L V O ym .. cfl . a, ri0N i (a O 0 O (rs ■— N -o o c rn ui , c`°i o .. .. 0 (n Truer = rr _W C 2 0 � 0ECCIY � 0I- F- U CD 0 0 0 U Q ' � _ 3 c ca L c U 0 V m �a o m m ci it who cocoa > cn cn r� 1,-X �.�� " �UNegaSM. nom°s.x�r�'�.-.'�u`s,�'.�sM."`i"xr ':::s�t,�x�AWAa�' .�:..Y � ��d4111:: , Yqg r) IG1NAL r/1 0 C z o a CL. -i U u ca v = ''O7 Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y i1 ct O .. j6 O O O O 0 0 0 O O 0 0 0 0 0 O O 03 CC n 2222Erci n5 03 03 22222 22222 22 0 w - (f) V) V) CO CO co CO CO CO CO CO CO CO co CO co CO V) a3 N (a (a C) Co Co a3 (a Co Co a3 a3 a3 Co a3 = aaaCl. • Cl_ aaaa 0_ 0_ 0_ 0_ 0_ as o 0. vN E o `0 a) `0 a) o `0 a) `0 `O `O `O `O `O `0 a) U U 0 o 0 0 0 0 0 0 0 0 0 0 00 0 0_3 O Co Co C 0_3 C (a Co C Co Co Co fo Co Co Co C O m E a s as a a LL (a LL LI. LL u. LL LL LL a) = -E 0 a) . a) N a) a) y a) a) a) m m a) a) N O 0 0 5 0 50 ° 50 0 0 0 0 0 05 U C C C C C C C C C C C C E "` 2 2 a) T. a) a3 a3 a) Co (a (a Co Co Co (a O)) E Co Co -.E. 0:1 C 03 Co -.E. a3 co a3 Co co co Co = 3 a) a) () a) a) a) m a) a) (1) a) (1) a) a) a) a) N 0000 0 -6500 00000 00 Cl) (M (M O(0 r r CO o(O (M M ' 7 CO6) O O) (6 (O _ CO CO (O M CO CO W n M 61 61 I- N N- r 06e-, V 4 N N M M CO M M N N06 (O (o V V ▪ V co 0_3 _W C-) -O 8000 O0000 00000 00 a) 8 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 U) u) L 6 CO l0 U)O t0 lf) O O N6 O O U) N N N- r L` O N N L- O O L-- O n O CO 0_3 Q�.+ N N CO 6) N M N l0 (O O O O CO `Cr (O (O d a) (O (O 6) O) ,- (O (N- C M O CO CO V CM- •M- 2❑ — — 0 M M 4 (O N N N M W N r O 6) C - V N N O O) N O M M O M N N N6) Q1 0 L- N- N (O N (<1 N (O V M (O W V 3` r U) N0) 0) M CO 00 CO O O O CO CO M )` r c_ " a V (O UV V O ' ) (O (O 6 M O co co O) 0) = m LL agi 1 N CO o _▪ -O 6) 6) V O O V CO 6) L- U) CO O O C) CO O N -- Cl) L- L- N O C!) CO r CO 6) .- 0 0 0 M O ,_ 2 L - - co O M (O O O U) W W O O N N O O) M O N- 6) N 0 0 ` N- O CO R a O O V (0 CO CO 0 e- CO O O 10 O CO V a U) ❑ (0 (fl O O W 6) (D 6) 0) (D (O co- co- O V 7 s- O �p V I� (fl N N V 0) O O R 0) n CO CO r^ E O 152-- r (O 7, N V 7 V 63 n N M r N CO as CI- Q O 0 N- N- CO 00 V V 0) N N 6) O 6) L- (0 co M O (0 (0 cl-0 CO O O O N- 8 CN 6) E C w co co 6) O (O CO O CO co u7 (O N r O N N CO W N NN x -6 ) Cl .) N- N O O 3 I.O Ou) C)) CO CO O 0 M MI) O 4m dLCO O M O O o CO O O O O N N OID 4-' .a- CO O 1,- Ot 0 0 N- OU O CO▪ 0_3 0 O O 7 LO CO CO O CO O O (O O CO R O (O O O 66M 66co- (O CO O O v .4-- 0 U z yN ❑ 2 • 2 E co N CO 0 ❑ m O y U L U) C N c a o) I = mg d It rnao ° m as CI C m V m• (0 CQO 0 0 0 0 O N cs N ❑_ O N N 0 L U C 0 as as 0 0 Q 3 CL 3 - — C ❑ a Z U U CO 0 O 0 m (N N B o a ct Lt 0 3 0 O " a CO as a) DJ _ 6) 0) U .-- e- M M 7 0_1 0 V U T ZT N •1 (O CO CO m N N ' N N N N N M co M M p �•ce U - ❑ s a Q 0_Q 4 4 v v 4 4 4 4 4 O o (h ICE Q� E as 6i m U 2 C (o (6 00 ,,=, 00 00000 v v p Z O "" 16 ❑ Z Z (V N U U N U U U U U U U 0 0 10 O C a 0 0 n Z U 0_ V'1' OO OO r M M V 6) O C c le M t U y a ( U 0 N N U N N N N N M M Co Co O (W�l r 0Cr Cr v c c v v v v c v v N O C O N C C CO 00000 00000 .N Z y(o ur m C = U U 0 Z iY 00E1-' 0C.) 00000 o o -C ❑ a) CO E - . . ' CO CO 0) 0) O ,- - co co_ V 0) O 0 0 O C 6) O (0 (0 Z (V (V O 0 o O (N C) - (O.) C Z a N N N N N N N N N N M M U U Q C R 0_3 E 7 V a V V V V V V a a 'V 4 c c U N A o 0 000000 00000 00000 m as _ Q > C C U) O C.) U U U U U U 00000 00000 a d Zi as rICO CO ORiGINAL Cl) a o Zc = 0 z at E2 CS in0 rAOm3 a 0 0 0 o ai uvi uvi U i°- aQaa 0c.)00 a, d) YYYY N OLLLLLLth LL � - - - - 0 cO LO 0 0 c) m ii ET Q T N C a p Cr) N r N a cON Q cL O O Cr) N II N n a 6' v 3 3 o m -c m U _ O O O OL E 0 N N Q d a) C V N C V 00 vi a) m c o CD a) a CO n CU m 0 O CO O N N C N E NI UO �al _ 00 v co -01 c E Q"Zr F R O O cT Vi - C N (O c4 6i p N 0 2 o � to , � T tll Y L 7 O N co Q m N M M O O C N L d 7 O +� 0 oMoov o v - c a L O w W (MOO U w Q s N 111- ^ LL N (O tp a) a) a) U O y^+i O y C Y m f6 NY/ Cri U CD N ca U N O a '5 a, w a) Uo N a Ma) � U � = ZS c6 U U N CO II C .N N 03 ai Ugni • Q YN 71-1 p ' lL U 1.1111 MQill . a�atoc mc mc �o 6 ° NI N N 0 0 El 0 c0 0 0 Q , - , IGIN L Y N CV s N m Z =,° I 1 El o o N 00 M ,N O � O 0 00 O r v N r S $$0. a - no ,. 0M,MNin,,1rn 0 ti N1�,pp-iONtpGMIV0i6o16 ON�02(�0)N O Ip pp NNpNM.tOWnpnnpn pOWM0,Q --- (J 888800188f48m8828b0 , yO 2 gOSN82GO6O;OO.,08O I- T v ppppo opo oo ooino 00000 Q W O O O 8 8 8 O O O O M O O O O O N O p O N M M Q O O Q O N O Q Q G Q 0 - O 3��yy �Npp�tO�aD CONMQWYJ m CDQNQNCDNQOmn NOnNO (pQ�I�201 OJNlGQ_p1��1��[) O O 0 i10ng":742QSMNMt 2r-P28 . In '- NNN NWMNOOO ppOnN — N IA u IrJHHmH ppppNMGC ppp�pp�+, pp 'r�W F,FA O14^.-T,T9.Q IIS���1111 nnnnnnn f��o8ogrom.2n GGGGOOOO OMNN 22a0(OQQQ 2288 g22b�0 0 m.% o_ CNtM"fNCp•JOOOD008000b� `�.-.�, N Q MCN ����ONNG OMMA2 pN phpM pf0(010(0(0(002220p 2 p 0 0 0 N M 8 N Yl2 2 2 N l g 1 6' OClMt+1N01�[lt(g . �.�� 0A 8$8_BinQnMQnmrom� o0 *PA e m Op (p pQ 22NNN 0ODNQ� l0(0(0(00220N NNMQ2 13�NO,Y000M20.-NME!... M 1�`la� N 7 N G O m O T N `• N 00 O 0 0 3 W, a 3 P. 1 3 ry g 3 > > b 1. m8 3 3 m 3m >"m -4 § § 1 § 1 o a sE >>a3m 9NE 3 s>“> ,31-@s ,$ z 353g?3>SamE=`"(rrr� $ 3i4•gag472a:a§g 4=e, (rm=am as aaaaaa -aa aa'-aaa.:aa'-a Es 8 W a 3 a _ :E S o 0 0 0000 0 0 0 0 0 0 o m o ) W l4 �� MIgg,„� s, 414480_ : AZAA2AaaAkaaaaaaaaaaaaaaaaasaaaaa,“ ivr $b�'4tie' U;;;; ::<E 7, � 4404 O aaaaaaaaaaaaaaaaaaaaaaaaaaaaaaa0OQ6 0 Pilli N o C U 3 Q (n W I 0 0 3 8 ` ;\ak \ ` \ ,011ti fk's m Q ,,Z,'.. N1, te / m Q m CC% 33 ,..ng o 1- gg LI td <ZSC144Z c � m Q m0 m o . Om ao -- >> J 0 w o 01 ei /t. 0 • $ i1,12! 1 \ \,� m 4 r 1 ,,.,i.,.1.0,111.:•::1.7\%%4;1;‘,: 13 o �°pa§pap ss mTD N yRR.Y., S AS N � _�- ` `a N > 0 O Agg 6 Fta2 4 O N li gg f 0 9 F' -Eah n, R 1 G 1 N A L Northing (4000 ft/in) „ I „ i , Iiii , I , , , iI „mI , , , , I „ „ I , , , , I „ iiI < i iI , iiiIiiiiIiiiiIiiiiIiiilI _ el _ CO O N CO VV 0 000 Q U d CO N _ m o Q _ — o CJ U — co 917 0 U _ rn Q - 3 - Q co _ O Lo O N N O N0_ — o v hi CO `1 m U oZ __ M U UQo Q TN m N _ ao o //�1��_ • — O N C - Nom' � - C V O _ a 00 I',.,� `41111101111 _ O CI 0 - v �r� co - W _ gil _ W — CO 50 - co c CO La 6 v p U o Z fU a ca O'0 - o Yea _ _ R o 3 _ aZm - y cZ — Q L - I.- (Da _ - a ai V - - 95›..g. — - 0 - _ o c O - 0 - I I I I I I I I I I I I I I , I I I I I I I I I I I III I I I I I I I I I I I I I I I I I , I I I I I I I I I I I I I I I I I I I I I , l l l I (u!/al 0000 6u!4poN Lifi' l N AL HALLIBURTON ConocoPhillips CD4-208Awp 19 Alaska Sperry Drilling ANTI-COLLISION SETTINGS 15:28,May 31 2011 Interpolation Method: MD, interval:25.00 Depth Range From: 6000.00 To 19113.82 Results Limited By: Centre Distance: 2107.75 GLOBAL FILTER APPLIED:All wellpaths within 200'+ 100/1000 of reference SURVEY PROGRAM Depth From Depth To Survey/Plan Tool 80.18 438.18 CD4-208PB1 Gyro(CD4-208PB1) CB-GYRO-SS 476.31 2617.81 CD4-208PB1 IIFR(CD4-208PB1) MWD+IFR-AK-CAZ-SC 2630.00 6000.00 CD4-208APB1 MWD(R100)(Rig: CD4-208AFf8tlID+IFR-AK-CAZ-SC 6000.00 12444.42 CD4-208Awp19(Plan: CD4-208A) MWD+IFR-AK-CAZ-SC 12444.42 19113.82 CD4-208Awp19(Plan: CD4-208A) MWD+IFR-AK-CAZ-SC CASING DETAILS TVD MD Name Size 2440.39 2594.51 9 5/8"x 12 1/4" 9-5/8 7410.00 12444.42 7"x 8-3/4" 7 7441.13 19113.82 4-1/2"x 6-1/8" 4-1/2 m a a 0 C.i . ET I IT ! U � , I i 0 80_ -.._ s I a1 U 0 l i i i i l l i l l i i l l i I l I I I I I I 1 I I l I 1 i 1 l 1 6000 8000 10000 12000 14000 16000 18000 Measured Depth LEGEND -- CD4-05,CD4-05,CD4-05 VO -A- CD4-210,Plan:cD4-210A,CD4-210Awp11 VO -4- CD4-304,CD4-304,CD4-304 V6 -e-- CD4-07,CD4-07,CD4-07 V1 -XF CD4-211,CD4-211,CD4-211 V2 -8- CD4-304,CD4-304PB1,CD4-304PB1 V16 -$-- CD4-12,CD4-12,CD4-12 VO -e- CD4-213,CD4-213,CD4-213 V4 -A- CD4-306,CD4-306,CD4-306 V1 -A- CD4-12,CD4-12P81,CD4-12P81 VO -9- C04-213,CD4-213,C04-213wp06 VO --X- CD4-318,CD4-318,CD4-318 V6 - - CD4-12,Nanuq 5,Nanuq 5 V1 -s- C04-214,CD4-214,CD4-214 V3 -A- CD4-316,CD4-318A,CD4-318A VS $- CD4-16,c04-16,CD4-16 V2 -0- CD4-215,CD4-215,CD4-215 V4 -i-- CD4-318,CD4-318PB1,CD4-318PB1 V3 CD4-17,c0417,CD4-17 V13 -9- CD4-298,CD4-298,CD4-298 VO -g- CD4-319,CD4-319,CD4-319 V5 $- CD4-208,CD4-208,cD4-208 V7 -e- C04-298,CD4-298PB1,CD4-298PB1 VO ---I- CD4-320,CD4-320,CD4320 V7 -4- CD4-208,C04-208PB1,CD4-208PB1 V6 -A- C04-301,CD4-301,CD4-301 VO -9-- CD4-320,CD4-320PB1,C04-320P81 V4 -e- CD4-208,Rig:CD4-208APB1,Rig CD4-208APB1 VO -9- CD4-301,CD4301A,CD4301A VO -X- Pun:CD4-03,Plan:CD4-03,CD4-03wp02 VO -0-- CD4-209,C04-209,CD4-209 V4 - CD4-301,CD4-301B,CD4-301B VO -9- CD4-208Awp19 -8- CD4-210,CD4-210,CD4-210 V3 -A-- CD4-302,CD4-302,CD4-302 V3 ..�,- t \NiGIN L -8-----g- 8286 83 241 ---0 c U:,peS 8 I r-- ,TViaN NI teM I:. P82888.8 O gg^eqgih44 N O /11 s p d WmV rn 8N I.<1,"..," g ,gaMMt.O ISI r ,6 of of n - ( 0 n .i 4� , . . p s Da .-o$..ion..i OO 1 U O e % • O rt i gl! I O 12;144 j I FP 1.1.. C�f'IN N"N ' O g g§G p 6 , p N O e,- aa66 OO ; �pNNNN V N �. � � , 200000U , I,AL. Co 1 e. N t of i d is ,I i "Ilk CA CDCD *,.q a > 114 ,. .,::,-; tro Q o co A 116 44. 41 JL me � ; • O COCD is 0 U J N _o), et I • , �/ O (17, I J I 0 I 0 1� s ;_ o °s+• ' 1 r , lik O o . J r.1 0 cease. O• ': O O O O O = app '� --, J O �J O O O O O 00 cA O N d- CO 00 Q 1 O •r r r r J : (ui% 0006 (+)upoN/(-)unhoS 1 1 fRIG1N [.- R M lV 999LZ91 -1 1 1 ° : : : 8 - a OOZVI 9999Z91 I I I c } I I ���,.,d.• ) 1 S 9969Z91 - I - 999VZ91-r I I I I I I I I 9981ZS1 I I 9992191 I I I I I I I .. I 9981291 . 9990Z91. (179' 9986191 I I 3 3 9999191 I I1116' 1i1g3g 998L191 I ( I I 1 9999191 :,,i, • OOZZL 9989191 99917191 II II IIII 999E191 e 9991191 1 I I I I I I 1 m N - - 33 998119 1 I I a 116 x $ m:.11 1 I I I I I I I .;.,:11 1-I �- m d (-)UV�os/(*)1JON o 75 941 O U — OOZot 0 — N a N $ 2 sg R a > > a t ; u b y CiO N • 0335 c0 • M N N- rnA 0 0 1 i COM s - e - r' o -61a i o- - ,f; 03 11—a F. a. r 1` a.a I . 3 oo1L Q / J N ./. o 4 4 ? ./ O 0 0 > a 0 0 c y 0 E u e E g 0019 II y g 41dea lo0I�eA 81111 we1sA8 d 1 & U ORIGINAL ! a esi7- A2 K ` ) § ( \ / 00 , k{ < | / = )7l � f0 2 & > 0 < zw n § / § B o / ) ... CD { 2 Lri ° . 7 §, ) / 0 4 !® . m2 ( � ! ! 2G § } ( g } ) / i7 l = 70 , 2 \ o . 2 T & 0. ƒ (../t) k C.) u to q k ` } J k / 0 0 0. $ . \ 0 o es \ { ) ORIGINAL CD4-208Awp19 Sidetrack Point r ` ,, 4 1 a i t {-T C PAI Coot dirot e C0 revelt++1' L i; t 11 From. Ti:: it p Datum: Id. .C� ..1 Region: ala k.a C�atlJrii: PI.�.C,� Region: �I�_:E-;.� ''. 3F II Gerin _.. • L,atib_IdeiLongitude 3 ec.irnal Ge rens .I _. Latitude../Longitude 1 _ ial Degrees .I ,a I LITr:•i Zone: �. r South r- LITH ,ne: Tn_Je 3 Sarn_Jth 1 i1 I + State Flare zone 14 .. Units: j -it 3 State Plane Zone: jTr' '-- (Unit - fi Tr,Jr' .< slJ3-it t 7 ! ;'. Legal Description fhdAD27 only) 4 Starting Coordinates: -. _. Legal Description 1 Tov.,nship ol1 'rI ,. Range: 1004E -.+1;.,11;11;;-.;.: Meridian: I_I ----,---i bertionl,,, :RAIL H 1847 .1298 'FEL .; 4, .1. 52? Tran toren Quit Help CD4-208Awp19 Intermediate Casing E-3 CPA d_00Iill rote 1_+PnV01t01n - `' s 1 Frorr, To: Datum: 1rl.AD83 "j Region: idlask.a .iDatum: {r• J.�D27 ,. Region: fI;�k:a :I Latitude/Longitude Decimal Degrees . Latitude/Longitude Decimal Deg-Fees .+ LI T r:1KC gone: f_..-_- South LITM Zone: True L,- South .. ` r------11-' _r __e•J Unt.: '1-1117--11 +" State Plane Zone: 14 + Units: IJft 'i - State Plane oneITlJr ♦i " 7. It ,•J i+ Legal Descriptions(NAD27' only) Starting Coordinates Legal Description 1151891 T„'::�r-,?I-iip' 1011 Range: ;LIC15 a E '� ' Y: i 59487214.87 Meridian: SII �, .�e�_tion:131 i IFNL H 1R49 20912 1FEL .r, ;4224 4889 ii Tran form Quit i Help 0 RIGINAL LCD4-208Awp19 TD E,j E-A! Coos drrate (_orvett ' R,7,,. EU . t ROM: __ __ -To: i Datura: 11...).6,1 ,5,---11-.„,7, Region: Datum: Region: i 3 kala:k;a �� �N.�D27 .•' g alask:a��� il �- Latitude/Longitude 'peril-nal Degrees Latitude?Lor�git�_rde Der_ir�ial Degrees C 3 i1 LITM Zone: 1 South i .'` LITM Zone: !True r South 13 ;'* '.State Plane Zone j4 F 1 Units: leas tt._ 71 j k;-. State Plane Zone: True LL•►Y,] Units: us-f Y , _ € 4 Legal Descriptions[NA.D2;only) E II1 Starting Coordinates: Legal Description E I X: 1520_;i la i to f 1 l icwgnship: 1010 IN .I Range: 05 IE 71 it `Y: )5942650.00_. li Efl Meridian: l U H _ection: 6 s t t FNL ,F1623.9654FEL Ti 2264.8446 1 11 I t TransformQuit Help 1 11 1 ll fRIG1N L Page 1 of 2 Schwartz, Guy L (DOA) From: Schwartz, Guy L (DOA) Sent: Thursday, June 02, 2011 9:32 AM To: 'Wnfree, Michael Alex(Jr.)' Subject RE. CD4-208Awp19 request for verbal approval (PTD 211-oho) Mike, You have verbal approval to proceed with your sidetrack as outlined below and depicted in the attached directional plan. Please submit a revised PTD as soon as possible. Guy Schwartz Senior Petroleum Engineer AOGCC 793-1226 (office) 444-3433 (cell) From: Winfree, Michael Alex(Jr.) [mailto:Michael.A.Winfree@conocophillips.com] Sent: Wednesday, June 01, 2011 2:59 PM To: Schwartz, Guy L(DOA) Subject: CD4-208Awp19 request for verbal approval Guy, Attached is the proposed directional profile for the upcoming sidetrack operations at CD4-208A. After reaching casing point at 11,704' MD, the drill string packed off and tight hole conditions were observed on the subsequent wiper trip 4 stands off bottom. The drilling BHA was pulled out of the hole and the attempt to recover the hole with a clean out assembly was unsuccessful. A sundry was submitted and approved to abandon the wellbore. The attachment shows the directional profile of the proposed sidetrack. The 7" intermediate casing shoe lands 1,334' MD away from the original permitted 7"shoe location. The primary reason for the sidetrack is hole instability in the lower shales, but based on the sand observed at the original casing point, the shoe location was moved southeast to an area expected to have a more favorable sand presence. Current operations on the rig are running in the hole with Baker ECP to kick off depth. Plan forward is to set kick off plug on top of the ECP and, pending AOGCC approval, kick off cement plug and re- drill the 8-3/4" intermediate interval. The revised Permit to Drill application will be delivered to the AOGCC office tomorrow (6/2/2011). ConocoPhillips requests verbal approval to continue operations as described above. Please let me know if you need additional information regarding the sidetrack operations at CD4-208A to process this request. Thank you, -Mike 6/2/2011 • 1 f' / r cp N 0( co DI i g,4 \ th ()(30(-4° , as n \ . 311 __, ' ....„--, s- `3 p4. r a, .,I 1. titw �� , i ° ! .1=1. ' ,.. -----___ , ,.., ..,lir ik-----67) / $_! P.CO .i a IL!' ' IV @} . .11u - fes/ '� r -p v 49 N .p o CO N • 0 D -1=1. A (Ti v cAa co d1 /„.. . I j _ , ( 00f -22 .4=... Q z . I I 03 ---.1 ,I, ca: .... , L...._, I . f _ . , ,..,., e A r . I ' 1 ----- c .. 1 ..affed 1 6 • -----7, __. ;31,00 OfizAil ill -----) ow ' \ I '--.' . 1114Witallr1 — 7 t 4? — 1 -NIITIVII . a. .......-. -st, ,li i Ali .0.- au) ..•• 0 0 4110111111111, , '%,It ff.,..e.. ,,. 3 Nap 411111/111111111140111111\ 47- / ki..........., 10011,itosiw ., ,:z :"1 10..„s, .„,_, 1:.,),,„*124111111111111r,•00•,._ ''''''. ,_ _-111111111k — 1 t %-4. '1* - 11010.4111.1VA i 0 -'712; I\ r...) ,, 0 . ---"- .",'• -7-t 4..a. -4)i- A', ..1 s '00-11.1 .;IV. '',,t. ' f grxr--"‘":, - 7 o 1,:•3 *. rd..' -1 -.I o ' dder .11, '21,, ,,. i --K 06, 4 I 70-- r; ._. i 0 ',!,'), 0- ,,, IP A -_,..............-__ .._ ,-, . - -411k:„1111111'-":---.:- --•—'"--;! flp- • il! * '.0 . co ly o , Al"-"---' ())4.6) (1., • ...---1;a,.# e 0 L 1'a . 1 -4 0 o o _P=. o A.. 1) : rz 0 t:-) ...IR _i::. c.) !;1 .--. _ . r, /.:. , _ ..0 b _." i -44111"111111*. ( t ii c) co I,4 CJ1 I 0 f. :..!. ,rntiocoot„iiw.4.1 e 0 - 0 4 CC' 0 0 . I ‹E' -'-' i., -•', ' 0 19.iel all I . ii...., - -- _ .. . g_ — , , 4. ,..., 0 ,,,, . ,_.. illi n, • ` . 110 1 ' 0 .0 ,ZI -4 1 r . 0 i:-"21 ,....,, ve -, _ ra — co i ..- 0, 0 ,. , 4„ GI-ft, ' coo . cz, I -,\ — ,i, - , 4, i • 4: .)''') • do Te . , 0 i .5:. 0 k ... _ . _ _ . cy--- • 1 . ,4_,,s- ,_: I C 0 -7' 4. • C) * 0 I ',.._ 44, III .:Z 0 -A- 0 -,. ,...„_...""...„.."7.7.,,X 6 o II i i TRANSMITTAL LETTER CHECKLIST WELL NAME ,r� az) 7 (7-422// PTD# Development Service Exploratory Stratigraphic Test Non-Conventio al Well-e • FIELD: (2,/,/-7/., t�1 CSC POOL: / )Z r// Circle Appropriate Letter/Paragraphs to be Included in Transmittal Letter CHECK ADD-ONS • WHAT (OPTIONS) TEXT FOR APPROVAL LETTER APPLIES MULTI LATERAL The permit is for a new wellbore segment of existing well (If last two digits in Permit No. ,API No. 50- - - API number are between 60-69) Production should continue to be reported as a function of the original API number stated above. PILOT HOLE In accordance with 20 AAC 25.005(f), all records, data and logs acquired for thepilot hole must be clearlydifferentiated in both q well name ( PH) and API number (50- - - ) from records, data and logs acquired for well SPACING The permit is approved subject to full compliance with 20 AAC EXCEPTION 25.055. Approval to perforate and produce / inject is contingent upon issuance of a conservation order approving a spacing exception. assumes the liability of any protest to the spacing exception that may occur. DRY DITCH All dry ditch sample sets submitted to the Commission must be in SAMPLE no greater than 30' sample intervals from below the permafrost or from where samples are first caught and 10' sample intervals through target zones. Non-Conventional Please note the following special condition of this permit: Well production or production testing of coal bed methane is not allowed for (name of well) until after (Company Name) has designed and implemented a water well testing program to provide baseline data on water quality and quantity. (Company Name) must contact the Commission to obtain advance approval of such water well testing program. Rev: 1/11/2008 M n�� * m a O r 73 CO m a 3 0 m O 0 o (n 'a a - r co 3 0 m 0 _ rT CD 1 i V 0 3. 0 o rn 3 rn oco o m ON m N d Ni N 7 O TS 7 0 O O O co —, —, co0 W co W co W W W W W Ni Ni Ni Ni Ni Ni Ni Ni Ni Ni CO CO ---.1C) C71 A CO Ni O n (O CW NiCOCb ) CT A -, 0 CO CO -) O) 01 A 0) Ni O ( -, 0 00 O) W Ni - ---.I(P A + 0 m SD O (n to 0 v n (n n W W O D D C) C) C) C) cn C) D n m m O O `� c r m Z � a 0 (D m wco m7- p p 7 0_ n 0 n D c 0 = 0) (D (D b -o n C m co 0 CD B. 0) b 0 O = CD O 0 _4 -1 7 (D N 7 Cl) Cl Cl)• 0 7 m m 3. '2. N m 'c m m m m' (� �c ° c cQ < < 0 C o m o m 3 3 v ° -. . 555 o (D 3 o 0 N n n7 0 = b (n Z 0) d 0) = O O N n N 0 o o o o C) 7 7 z cp 7 0 ) N 0) 0 n o O (D n C N co = CD O 0 O o 0 0 C * 0) 3 0) N a s 0) 0) 01 * C N N O 0) 0 7 0) ° 7 0 0 p l 0 O n n N (7 CD 7 7 7' O 0) CD CD N = 3 7 C7 7 0) 7 Q 0 0 N * 7- N (0. < CD CD c. .0. N ." n o' O' N 7 0 n O. n o' 0) m 0o o , n N. 0 _ C a Es., At p — m A- v m o c up - °. 5 * (D CD 0 CD < < v b b 7 07 m N v TI n 0- 0 0 O o Ey. N (. Q 7• O N O 0) (Q 0) 0) 0) 0) •o (O ,-.•=': b (A N b 10 63) �_ '00 ,c8 00 b0 - Q° 0 0 0 7 C ^' O co 3 N n co • 0 n - co co p b 0 A jb c c 0 0 Er N N n '0 co'- O r 7 C b 0 ° 3 com 3 Q 0 o m 7 0 m (D o v (D ? 0 ° 7 r a m v, n 7 c° o c� � o o m o 3 m o a a � m < O: n o 7 ° N b b 0 O O A O 0� <. .. — < n m N 7 n O o m v m (n o• ° (� b O m m F m ° m o F F v N m ° o w o o gi "3 � F 7 o m - o cD v o m m b 7 c n m o o Qa 7 ° c CD. N D p N m o c° ° n m co vED o 0 0 0 °) F v v o. o ,c» ° -Cr). . 0 m, o Q m o D r O cn (� .< o 0 (D (O `L- 0" o I N 7 0 b Cv b cu C) oc c0 O 0 • o N n o n C n O O r �. b 3 N 0 7. m 7 x m QJ 0 7 . W 7 7 o m 3 7 5 n - 3 3 cc D r --.44\-;DD- �p O O Cn CD -O n < < N Cn (n N 0 7 0 7 5 m (D c° ° o CO o 5 o c b o' v a m o n o n Z m c° Cu CD (n 0 D C cn -0 C 0 7 7- CO 7 u) * C 0) vi 2 c) c° s a '0 n 77 N a w o � 3 m lU ° -0 17 a,cY(D '7 m o w N A co (o 0 m 0 o n o• o (D o D ° (n n (n C 7 < c C 7- C o �, ll 0 7 L. Z \�\ X m o o °) b ° N ° a) a iv m -° 3 0 (0 o co C) °1 y 0 o N < CD . Q co 2 0'v w co O n) O o m m o `-Z0 .7-. 0 4t 0 0 7- 7 NI,:��m 7 m .< o �# rn co. 0 0 o ° 4t 7 co 5- co co 2 0 o O co 3 co j v N ' o 7 n 6 v i 0 (n I O I k. -< -< -< -< • < -< -< -< -< z z m D• D D o o D ° ° ° ° mDm m 0 ° ° D D D o ° m m m m m m m ° ° ° WO a <0 m Q� < v (o m 2 z K K * m w 71 Co 0 z cn (n o —" o o o o b o m x Ni 0 > co m a — co 2 2 CD C c o 0 0 0 0 0 0 0 Z to 0 cn I w x - x s r N v w n 3 Z Z p m O m o co cNn o m a 0.) N 03 - 7 N N 0 moo r Z c� N n co CD N n •`G. 0 a C) O O O AA AA 0 m N n 0T. CD c7j b (J1 " 7 j O- - N Cn (n N W W O0 5 O CD CD Tv7 O n 7CD 7 0 ? co co C D CD C 0 .� b (D CO (O 7 (� 0 < CD (D Z 7 m m b ° m. D (O ° 3 o o o m 2 v 0) O CD n —. cp CD (n 0 V) c'D 5' cD C b Cn 7 0) 0 I- CD b a .cl C • N O N b 7 N 7 0CD 70 7 O CWO 0 co (on 7 0 ID 0 0 CD cD C" CD D 0 N .07. '7 7 CD 0 co r D o ° m (n o . n 0 "< 0 o -0 Z 1- ." r co 3 n D co - m w o m 15. fD 0 co W OD ' 0_ '� • ( N 7 O 0 co N co b CD (b 7co �1 co 0o F N -0 b co m 'Z F 0 3 UHi m° W O D N 7 O N CD N b (n W CON 3 7 (O = 7 CJI0 C 7 0 O (° i ° O n co 0 m m O -DID n N (0 3 n m N 0 c o 0 0 < 01 N. CO 0 0) 0) 00 0 7 N co 7 ..J N CD co m �_ (D o b n m p m c °° m = an = u) 3 3 0 cnn 0. O m w o D fl v o 0 N w O * CO °). o • CA v ca j0 S 7 Vp 0 O D n CD 7cD� O 7 2), D CD (D 0- F c o f 0 0 * o o A co n 7 0 o a a ..... o = a q W 7 m (D -. (D 7 = 0' _ p O n W o x O' 0 CD (0 O D co O `2_ b 0 N () Cl) 3 _ b 3 c a w 0 0- (° cn 7 CD (o O 7 co r 0 3 SU O -. x w 7 co O 3 7 Con O Q o co 7 b C CO w fD n (D o C O N 0 7- b N n 7 7 O N m co v cn n co 3 < (� o N o m o o O O Q n n m c 0— • CO m (n • 2 0 o 0 r0 0 B. 7" 0Oo (D (n A v CD m o D 0 b j CD co C — O g 7 0 C) (I)' 0 P O (0 0) •0 0 N O x f Page l of l Schwartz, Guy L (DOA) From: Schwartz, Guy L(DOA) Sent: Thursday, May 12, 2011 7:51 AM To: 'Hunt, Hai L' Subject: RE: CD4-208A(PTD#211-060): Change to completion plans Hai, As long as the packer depth has at least 300' of cement above it you are good to go (which it does).... This email will satisfy notification to the Commission as it a relatively minor change to the completion. I will place the new drawing in well file. Guy Schwartz Senior Petroleum Engineer AOGCC 793-1226 (office) 444-3433 (cell) From: Hunt, Hai L [mailto:Hai.L.Hunt@conocophillips.com] Sent: Wednesday, May 11, 2011 5:09 PM To: Schwartz, Guy L (DOA) Subject: CD4-208A (PTD#211-060): Change to completion plans Guy, We decided to change the completion plan after not finding a suitable way to pressure test the entire tubing string and PBR using the original plan due to wellbore deviation. The new plan is to run a Baker Premier packer higher up in the hole and tie it to the liner with a long tubing tail. The connection at the liner will not be a hydraulic barrier. Please see attached schematic. What kind of paperwork do we need to send in to make this change official? Thanks -Hai Hai Hunt Completion Engr ConocoPhillips Alaska,Inc. Office:(907)263-4674 Cell; (907)317-6342 Email: Hai.L.Hunt@ConocoPhillips.com 5/12/2011 CD4-208A Well Plan WP10 Proposed Schematic 16"65#H-40 Welded MD TVD Conductor to 114' Upper Completion: 1)4-% Camco BP-6i(5.591"OD) (27°) 2097' 1915' 3.813 DB Profile • with% control line to surface. Cannon Cross-coupling clamps on every joint sssv O WRDP-2-LO SSSV to be run off rig BP-6i profile will be run with isolation sleeve w/DB lock;min ID=2.25" 9-5/8"40 ppf L-80 BTC Surface Casing 2)4-% x 1 Camco KBG-4-5 GLM w/DV(49°) 3795' 3400' @ 2594.3'MD/2440.2'TVD GL J O cemented to surface 3)4-% x 1 Camco KBG-4-5 GLM w/DV(58°) 7824' 5600' TOC at least 4)4-% x 1 Camco KBG-4-5 GLM w/DCK2(65.1°) 10914' 7158' 500'MD over Top Qannik Pinned for 2500 psi casing to tbg shear ES Cementer 5)Camco 4-'/z Gauge Mandrel L-80 (66.7°) 10960' 7177' 0 O Q Set below Base w/Sapphire digital Pressure and Temperature Qannik gauge Connected to surface with% x 0.035" Encapsulated I-Wire Top Qannik Cannon Cross-coupling clamps on every joint 5000'MD/ 4076'TVD 6)Baker 4.5"x 7"Premier Packer (68°) 11000' 7193' 7)HES XN 3.813"(3.725"NoGo) (70.9°) 11080' 7220' • To be run w/RHC plug body GL J O Lower Completion: 4-1/2" 12.6#L-80 IBT-M 8)HRD Sleeve w/10'tie back extension(74.75°) 11190' 7253' tubing run with Jet Lube Run'n'Seal pipe dope 9)Baker 5"x7"Flexiock Liner Hanger(75.1°) 11200' 7256' • • 10)—20 x 4-% 12.6#L-80 SLHT Perforated Pups • • Spaced out every 350'MD • Packer Fluid mix: • • Inhibited Kill weight Brine 11)Orange Peel shoe(89.7°) 18970' 7354' • • with 2000'TVD diesel cap ••• 0 CD TOC at least 300'MD above Packer&500' MD above Kuparuk C. IQ� O /. Top Kuparuk C ;�� 00 --350'between 10,607'MD/7081'TVD - 4 10 perforated pups CD Top Alpine C 11,433'MD/7355'TVD 7"26#L-80 BTC-Mod 4-'/: 12.6#L-80 SLHT Liner 6-1/8 Hole,TD at to 11,482'MD/7360'TVD to 18,980'MD/7410'TVD at 18,980 MD/7410'TVD sifimE ALAsEA SEAN PARNELL, GOVERNOR ALASKA OIL AND GAS 333 W.7th AVENUE,SUITE 100 CONSERVATION COM1ILISSION ANCHORAGE,ALASKA 99501-3539 PHONE (907)279-1433 FAX (907)276-7542 G.L. Alvord Alaska Drilling Manager ConocoPhillips Alaska, Inc. P.O. Box 100360 Anchorage, AK 99510-0360 Re: Colville River Field, Alpine Oil Pool, CD4-208A ConocoPhillips Alaska, Inc. Permit No: 211-060 Surface Location: 2919' FNL, 206' FEL, SEC. 24, T11N, R4E, UM Bottomhole Location: 1535' FNL, 2015' FEL, SEC. 06, T1ON, R5E, UM Dear Mr. Alvord: Enclosed is the approved application for permit to re-enter and re-drill the above referenced development well. This permit to drill does not exempt you from obtaining additional permits or an approval required by law from other governmental agencies and does not authorize conducting drilling operations until all other required permits and approvals have been issued. In addition, the Commission reserves the right to withdraw the permit in the event it was erroneously issued. Operations must be conducted in accordance with AS 31.05 and Title 20, Chapter 25 of the Alaska Administrative Code unless the Commission specifically authorizes a variance. Failure to comply with an applicable provision of AS 31.05, Title 20, Chapter 25 of the Alaska Administrative Code, or a Commission order, or the terms and conditions of this permit may result in the revocation or suspension of the permit. Sincerely, I a iel T. Seamount, Jr. r Chair DATED this day of April, 2011. cc: Department of Fish 85 Game, Habitat Section w/o encl. (via e-mail) Department of Environmental Conservation w/o encl. (via e-mail) STATE OF ALASKA ECDIVED; AL. A OIL AND GAS CONSERVATION COME JON ', A 201i PERMIT TO DRILL 20 AAC 25.005 `..--)`:1 5• {',ax Cons_Commission 1a.Type of Work: lb.Proposed Well Class: Development-Oil Q • Service- Winj El Single Zone Q . lc.Speciy if well is proposed for: Drill ❑ Redrill ❑ Stratigraphic Test ❑ Development-Gas ❑ Service-Supply ❑ Multiple Zone ❑ Coalbed Gas ❑'Gas Oes ❑ Re-entry 0 Exploratory ❑ Service- WAG ❑ Service-Disp ❑ Shale Gas ❑ 2.Operator Name: 5. Bond: Blanket El Single Well ❑ 11.Well Name and Number: ConocoPhillips Alaska Inc Bond No. 59-52-180 • CD4-208A • 3.Address: 6.Proposed Depth: 12.Field/Pool(s): P.O.Box 100360 Anchorage,AK 99510-0360 MD: 18,980' • TVD: 7,411' • Colville River Pool 4a. Location of Well(Governmental Section): 7.Property Designation(Lease Number):3B407,1� 2919'FNL,206'FEL,SEC.24,T11N,R4E,UM ADL 384209,388903,38007739PD FA•77Alpine Oil Pool • Top of Productive Horizon: 8.Land Use Permit: 13.Approximate Spud Date: 59'FNL,354'FEL,SEC.36,T11N,R4E,UM ALK 380077 5/6/2011 Total Depth: 9.Acres in Property: 14.Distance to Nearest Property: 1535'FNL,2015'FEL,SEC.6,T10N,R5E,UM 2560 1.2 miles from CRU boundary 4b.Location of Well(State Base Plane Coordinates-NAD 27): 10.KB Elevation above MSL 56.1 feet 15.Distance to Nearest Well Open Surface: x- 378,038 • y- 5,957,493 • Zor 4 GL Elevation above MSL 19.8 feet to Same Pool: CD4-12,1,506' 16.Deviated wells: Kickoff depth:/ .0320" et .$7i .Maximum Anticipated Pressures in psig(see 20 AAC 25.035) Maximum Hole Angle: 90 degrees Downhole: 3,188 , Surface: 2,452 • 18.Casing Program: Specifications Top - Setting Depth - Bottom Cement Quantity,c.f.or sacks Hole Casing Weight Grade Coupling Length MD TVD MD TVD (including stage data) 8-3/4" 7" 26 L-80 BTC-M 11,482' 37 37 11,482' 7,361' 1st 560 sx 15.8'G'2nd 214 sx 15.8 G / 6-1/8" 4-1/2" 12.5 L-80 IBTM 7,770' 11,200' 7,312' 18,970' 7,361' liner with blank/perf pups 19. PRESENT WELL CONDITION SUMMARY(To be completed for Redrill and Re-Entry Operations) Total Depth MD(ft): Total Depth TVD(ft): Plugs(measured): Effect.Depth MD(ft): Effect.Depth TVD(ft): Junk(measured): 12,792' 9,106' Casing Length Size Cement Volume MD ND Conductor/Structural 114' 16" Pre-Installed 114' 114' Surface 2,594' 9-5/8" 530 sx lead ASL 230sx tail"G" 2,594' 2,440' Intermediate 7,314' 7" 200 sx Class G 7,314' 6,166' Production Liner 5,613' 3-1/2" n/a 12,782' 6177' Perforation Depth MD(ft): Perforation Depth TVD(ft): 20. Attachments: Property Plat ❑ BOP Sketch❑ Drilling Program Q Time v.Depth Plot ❑ Shallow Hazard Analysis Diverter Sketch❑ Seabed Report ❑ Drilling Fluid Program Q 20 AAC 25.050 requirements 21. Verbal Approval: Commission Representative: Date 4/25/2011 22. I hereby certify that the foregoing is true and correct. Contact Mike A.Winfree 265-6820 ! Printed Name G.L...l•. aAlvord Title Alaska Drilling Manager Signature & Phone 265-6120 Date 4/25/2011 Commission Use Only Permit to Drill /^ API Number: 'T Permit Appr I '\ See cover letter for other Number: 2/i D� 50-4a3-ZD(5i7-c/_40 Date: ��` �Y�, 1� requirements. Conditions of approval: If box is checked,well may not be used to explore for,test,or produce coalbed methane,gas hydrates,or gas contained in shales: Other: * 3 SOC' r Yt- /3oIP "7 jjL Samples req'd: Yes❑ No Q' Mud log req'd: Yes ❑ No LE 4'zsmor Sc 4 hat W.1 fir-- 3-t� 1'V` 4,> HZS measures: Yes El No[t� Directional svy req'd: Yes R'No 11 1 //'/ //.- APPROVED BY THE COMMISSION DATE: ,COMMISSIONER ORtGINAL �� Form 10-401(Revised 7/2009) This permit is valid for 24 months from the date of approval(20 AAC 25.005(g)) Submit in Duplicate ConocoPhillips Alaska, Inc. Post Office Box 100360 Anchorage,Alaska 99510-0360 ConocoPhillips Telephone 907-276-1215 April 25,2011 Alaska Oil andh Gas Conservation Commission RECEIVED' 333 West 7 Avenue,Suite 100 Anchorage,Alaska 99501 Re: Application for Permit to Drill CD4-208A Dear Sir or Madam: Alaska 0t1 &teas Cone.CommiSSi011 Ancnerrge ConocoPhillips Alaska, Inc. hereby applies for a Permit to Drill an onshore horizontal producing well from CD4 drilling pad. The intended spud date for this well is 5/6/2011. It is intended that Doyon Rig 19 be used to drill the well. CD4-208 was plugged and abandoned with cement per the Sundry numbers 311-053 for pre-rig work and 311-090 for rig de-complete. ^ CD4-208A is planned to be a horizontal Alpine C sand producer. The 8-3/4"intermediate hole will be drilled off of a cement kick-off plug out of the existing 9-5/8"surface casing to a depth of 11,482' MD/7,360'TVD. After setting 7"intermediate casing,the 6-1/8" horizontal section will be drilled and the well completed as a producer with blank/perforated pup liner. The well will be flowed back to mitigate formation damage. It is expected that the K2(Qannik)sand will be considered a significant hydrocarbon bearing zone. A stage tool will be run to cement off the Qannik with 500'of cement above and below the interval. Lead cement will be pumped,then the stage tool will be opened and a second cement job pumped to isolate the Qannik. This will leave a mud gap between the two stages. The Nanuq formation will be cemented a minimum 500'above top of the sand. Please find attached the information required by 20 ACC 25.005 (a) and (c) for your review. Pertinent information attached to this application includes the following: 1. Form 10-401 APPLICATION FOR Permit to Drill per 20 ACC 25.005(a). 2. A proposed drilling program 3. A drilling fluids program summary. 4. Proposed completion diagram 5. Pressure information as required by 20 ACC 25.035(d)(2). 6. Directional drilling/collision avoidance information as required by 20 ACC 25.050(b). Information pertinent to the application that is presently on file at the AOGCC: 1. Diagrams of the BOP equipment, diverter equipment and choke manifold lay out as required by 20 ACC 25.035(a)and(b). 2. A description of the drilling fluids handling system. 3. Diagram of riser set up. If you have any questions or require further information, please contact Mike Winfree at 265-6820. Sincerely, Mike A.Winfree Drilling Engineer Attachments cc: CD4-08 Well File/Sharon Allsup-Drake ATO 1530 Mark Chambers ATO 1566 Liz Galiunas ATO 1500 Mike A.Winfree ATO 1704 Lanston Chin Kuukpik Corporation Alpine : CD4-208A Procedure 1. Move on Doyon 19. Confirm that a BPV is installed before MIRU. 2. Pull BPV. Circulate KWF through tubing kill string at 2,000' MD. 3. Pressure test casing to 3,500 psi for 30 minutes 4. Install two way check. 5. Pressure up IA to test TWC in direction of flow. • 6. With two tested barriers in place, ND Tree, NU BOPE. 7. Shell test BOPE and flange break. 6U... 8. Pull TWC 9. RIH with 4-1/2"landing joint and screw into tubing hanger Q 10. Pull 4-1/2"Tubing Hanger and 3-1/2"kill string to floor. l cA 11. Set test plug and test BOPE 3 S o jos.. /2-3-06 rs� 12. Pick up 8-3/4"drilling assembly 13. Open hole sidetrack below surface casing with 8-3/4" Drilling assembly at 2,650' MD 14. Drill out 20'of new hole. Perform leak off test. ' 15. Drill 8-3/4" hole to 7"casing point in the Alpine C sand at 11,482' MD/7,360'TVD.(LWD Program: GR/RES) au.) • 16. Run and cement 7" casing as per program. Cement 2nd stage to cover Qannik if found to be hydrocarbon bearing. per D Carry out a leak off test down the 9-5/8"x 7"casing annulus to confirm the fracture pressure referenced to the casing shoe. Freeze protect casing annulus and casing. 17.BOPE test to 3500 psi. 18.PU and RIH with production drilling assembly(LWD Program: GR/RES/PWD/ADR). Pressure test casing to 3500 psi. 19.Drill out and perform formation integrity test to 12.5 ppg EMW. Minimum acceptable leak off for drilling ahead is 11.0 . ppg EMW. 20.Drill 6-1/8" horizontal section to well TD. - 21.Circulate the hole clean and pull out of hole. - 22. Run lower completion of 4-W, 12.6# L-80 SLHT blank and pre-perforated pup liner and liner hanger and liner top packer. 23. Run upper completion of 4-1A, 12.6#, L-80 tubing with SSSV DB profile, 3 GLM, XN profile and wireline entry guide. ' Land hanger. 24. Install 2 way check and test and pressure test hanger seals to 5000 psi. Nipple down BOP. 25. Install tubing head adapter assembly. Pressure test adapter assembly to 5000 psi. Remove 2 way check. 26. Drop ball and rod, shear valve in GLM and test tubing and annulus to 3500 psi/30 mins 27. Circulate tubing to diesel and install freeze protection in the annulus. 28. Set BPV and secure well. Move rig off. • Post rig well work will include pulling the ball and rod assembly,and GLV change out. OFflGINAL DRILLING FLUID PROGRAM Intermediate hole Pilot Production Hole Section— hole and to 7"casing 6 1/8" point—83/" Density 9.6— 10.2 ppg 10.0— 10.3 ppg PV 10—25 10 -15 YP 15—25 25-30 Funnel Viscosity Initial Gels 4—8 10-15 10 minute gels <18 12-20 API Filtrate 4— 12 cc/30 min NA HPHT Fluid Loss at 160 (drilling) 12-14 cc/30 min PH 9.0— 10.0 9.0-9.5 KCL 6% Intermediate Hole Section: The intermediate section will be drilled with inhibitive salt mud system. Ensure good hole cleaning by pumping regular sweeps and maximizing fluid annular velocity. There is potential for lost circulation, particularly after the reservoir is penetrated. Maintain mud weight at or below 9.8 ppg and be prepared to add loss circulation material. High mud weights are required for lower shale stability. Good filter cake quality, hole cleaning and maintenance of low drill solids (by diluting as required) will all be important in maintaining wellbore stability. Production Hole Section: The horizontal production interval will be drilled with a MOBM drill-in fluid. The fluid will consist of 80/20 OWR. Base oil is LVT-200 mineral oil, the internal phase will consist of 33% w/w CaCl2 brine with emulsifiers and wetting agents. Sized calcium carbonate will be used as a bridging agent for proper filter cake building and fluid loss control. ORIGINAL CD4-208A Completion Schematic L1 #udctor to 114' 1)4-'/�'Camco BP-6i(5.591"OD) 2200' 1915' 3.813"DB Profile with'''h' control line to surface. Cannon Cross-coupling clamps on every joint WRDP-2-LO SSSV to be run off rig 2)4-'/z"x 1"Camco KBG-2 GLM w/DV(49°) 3800' 3400' 3)4-%"x 1"Camco KBG-2 GLM w/DV(58°) 7900' 5635' 9-5/8"40 ppf L-80 BTC — NJ-a Surface Casing 4)4-/z"x 1"Camco KBG-2 GLM w/DCK2(68°) 11000' 7249' 041 GL 5 @ 2594.3'MD/2440.2'TVD Pinned for 2500 psi casing to tbg shear 5 cemented to surface 5)HES 3.813"X Profile w/RHC Plug Body(69°) 11036' 7261' TOC at least 6)Camco 4-1"Gauge Mandrel L-80 with --11140' 500'MD over Top Qannik Sapphire digital Pressure and Temperature gauge Connected to surface with''/d x 0.035" - ES Cementer Encapsulated I-Wire 9Set below Base Cannon Cross-coupling clamps on every joint r 0 0 Qannik 7)Seal Assembly, w/''/Mule Shoe 11200' 7312' TopQannik • i� S�pDD I N�17 Liner Top Packer,Liner Hanger 5,014'MD/ 8)HES XN 3.813"(3.725"NoGo) 4,083'TVD 9)-20 Perforated Pups • O 10)Float shoe GL ,I 3 4-1/2" 12.6#L-80 IBT-M tubing run with Jet Lube Run'n'Seal pipe dope • TOC at least 300'MD O Packer Fluid mix: above Packer&500' O Inhibited Kill weight Brine MD above Kuparuk C - with 2000'ND diesel cap -350'between Top Kuparuk C `O -,,C E —fes perforated pups 10,600'MD/7078'TVD "• O o r Top Alpine C 11,433'MD/7,355'TVD 4-1/2 12.6#L-80 Liner 7"26#L-80 BTC-Mod to 18,970'MD/7,410'ND to 11,482'MD/7,360'TVD 6-1/8"Hole,TD at at 18,980'MD/ - 7,410'TVD ORIGINAL CD4-08 PRESSURE INFORMATION AND CASING DESIGN (per 20 ACC 25.005( c )(3,4)and as required in 20 ACC 25.035 (d)(2)) The following presents data used for calculation of anticipated surface pressure (ASP)during drilling of this well: Csg Setting Fracture Pore Casing Size Depth Gradient pressure ASP Drilling (in) MD/TVD(ft) (lbs./gal) (psi) (psi) 16 114/ 114 10.9 52 53 9 5/8 3594/2440 14.5 1128 1,138 7"/TD 11482/7360 16.0 3,188 2452 N/A 18980/7410 16.0 3,188 N/A PROCEDURE FOR CALCULATING ANTICPATED SURFACE PRESSURE (ASP) ASP is determined as the lesser of 1) surface pressure at breakdown of the formation casing seat with a gas gradient to the surface, or 2)formation pore pressure at the next casing point less a gas gradient to the surface as follows: 1) ASP = [(FG x 0.052)-0.1]D Where: ASP=Anticipated Surface pressure in psi FG = Fracture gradient at the casing seat in lb/gal 0.052 = Conversion from lb./gal to psi/ft 0.1 =Gas gradient in psi/ft D =true Vertical depth of casing seat in ft RKB OR 2) ASP = FPP—(0.1 x D) Where; FPP= Formation Pore Pressure at the next casing point ASP CALCULATIONS 1. Drilling below conductor casing (16") ASP = [(FG x 0.052)—0.1] D = [(10.9 x 0.052)—0.1]x 114 =53 psi OR ASP = FPP—(0.1 x D) = 1128—(0.1 x 2494') =879 psi 2. Drilling below surface casing (9 5/8") ASP= [(FG x 0.052)—0.1] D = [(14.5 x 0.052)—0.1] x 2440 = 1138 psi OR ASP = FPP—(0.1 x D) =3188—(0.1 x 7360') =2452 psi 3. Drilling below intermediate casing (7") ASP = FPP—(0.1 x D) =3188—(0.1 x 7360) =2452 psi • OFGtNAL Well Proximity Risks: Directional drilling/collision avoidance information as required by 20 ACC 25.050 (b) is provided in the attachments. There are no wells that fail major risk analysis. The closest well to the proposed CD4-208A wellpath is CD4-12 with an ellipse separation of 102' at—5,200' MD. Drilling Area Risks: Reservoir Pressure: Offset injection has the potential to increase reservoir pressure over predicted, • although this is highly unlikely, the rig will be prepared to weight up if required. Lower Shale Stability: High mud weights in the intermediate will require higher mud weights to stabilize. Standard LCM material and well bore strengthening pills are expected to be effective in dealing with lost circulation if needed. Additional care and attention will be given to the higher potential of inducing a kick when drilling horizontally as opposed to vertically. Good drilling practices will be stressed to minimize the potential of taking swabbed kicks. Annular Pumping Operations: Incidental fluids developed from drilling operations on well CD4-208A will be injected into a permitted . annulus on CD4 pad or the class 2 disposal well on CD1 pad. The CD4-208A surface by intermediate casing annulus will be flushed with 300 bbls of fresh water prior to freeze protecting with diesel to 2000' TVD. The significant hydrocarbon zones are the Alpine, Kuparuk, Nanuq and the Qannik reservoir. There will be 500'of cement above the top of the Qannik reservoir. Upon completion of CD4-208A form 10-403, Application for Sundry Operations, will be filed. Annular pumping of fluids occurring due to drilling operations, per regulation 20 AAC 25.080, could then begin once properly permitted. As stated above, any zones containing significant hydrocarbons will be isolated prior to initiating annular pumping. There will be no USDW's open below the shoe or potable/industrial water wells within one mile of the receiving zone. Reference the enclosed directional drilling plan for other formation markers in this well. The maximum volume of fluids to be pumped down the annulus of this well will not exceed 35,000 bbl without the specific permission of the AOGCC. Fluid densities will range from diesel to a maximum of 12.0 ✓ ppg for drilling fluid wastes. Using 12.0 ppg fluid and the rig's specified maximum pumping pressure of 1,500 psi for annular injection, the maximum pressure at the surface casing shoe is estimated by: Max Shoe Pressure =(12.0 ppg)*(0.052) *(Surf. Shoe TVD) + 1,500 psi = (12.0 ppg)*(0.052)*(2594') + 1,500 psi = 3,118 psi Pore Pressure = 1,128 psi Differential =3056— 1128 = 1,990 psi. The internal casing pressure is conservative, since frictional losses while pumping have not been taken into consideration. The surface and intermediate casing strings exposed to the annular pumping operations have sufficient strength by using the 85% collapse and burst ratings listed in the following table: Wt Connection 85%of 85%of OD (ppf) Grade Range Type Collapse Collapse Burst Burst 9-5/8" 40 L-80 3 BTC- Mod 3,090 psi 2,626 psi 5,750 psi 4,887 psi 7" 26 L-80 3 BTC-Mod 5,410 psi 4,599 psi 7,240 psi 6,154 psi CD4-2O8A Drilling Hazards Summary (to be posted in Rig Floor Doghouse Prior to Spud) (See Well Plan Attachment: Detailed Risk Information for further discussion of these risks) 8-3/4" Hole / 7" Casing Interval Event Risk Level Mitigation Strategy Abnormal Pressure in low BOPE drills, Keep mud weight above 9.6 ppg. Surface Formations Check for flow during connections and if needed, >2000' TVD increase mud weight. Lost circulation Low Reduced pump rates, reduced trip speeds, real time equivalent circulating density(ECD) monitoring, mud rheology, lost circulation material Hole swabbing on trips Moderate Reduced trip speeds, mud properties, proper hole filling, pumping out of hole, real time equivalent circulating density(ECD) monitoring, weighted sweeps. Abnormal Reservoir low Well control drills, increased mud weight. No • Pressure mapped faults occur within 500'of the planned wellbore. Hydrogen Sulfide gas Low H2S drills, detection systems, alarms, standard well control practices, mud scavengers 6-1/8" Hole / Horizontal Production Hole Event Risk Level Mitigation Strategy Lost circulation moderate Reduced pump rates, reduced trip speeds, real time equivalent circulating density(ECD) monitoring, mud rheology, lost circulation material Hole swabbing on trips Moderate Reduced trip speeds, Pump out to 7" shoe, mud properties, proper hole filling, pumping out of hole, real time equivalent circulating density(ECD) monitoring, weighted sweeps. Abnormal Reservoir Medium BOPE drills, Keep mud weight above 9.8 ppg. Pressure Check for flow during connections and if needed, increase mud weight. Well control drills, increased mud weight. Hydrogen Sulfide gas Low H2S drills, detection systems, alarms, standard well control practices, mud scavengers Cementing Program: 7" Intermediate Casing run to 11,482' MD/7,360' TVD Cement from 11,482' MD to 8,450 +/-' MD (minimum 500' MD above top of Nanuq reservoir) with Class G+ adds @ 15.8 PPG.Assume 40% excess annular volume. Tail: (11,482' — 8,450') X 0.1503 ft3/ft X 1.4 (40% excess) = 638 ft3 annular vol. 80' X 0.2148 ft3/ft= 17.2 ft3 shoe joint volume Total volume= 638 + 17.2 = 655 ft3 => 560 Sx @ 1.17 ft3/sk System: 560 Sx Class G+ 0.2% D046 antifoamer, 0.25% D065 dispersant, 0.25%D800 retarder and 0.18%D167 fluid loss additive @ 15.8 PPG yielding 1.17 ft3/sk Second Stage: Cement from ports in a ES stage collar set 500' below the K2 interval to +/- 500' above the K2 interval with Class G+ additives @ 15.8 ppg. Assume 40% excess annular volume Lead: (5,520'-4,500') X 0.1503 ft3/ft X 1.4 (40% excess) =214.6 ft3 annular vol. Total Volume=216.3 ft3=> 185 Sk @ 1.17 ft3/sk System: 214 Sx Class G+ 0.2%D046 antifoamer, 0.3% D065 dispersant and 1% S002 accelerator @ 15.8 PPG yielding 1.17 ft3/sk ConocoPhillips(Alaska) Inc. Western North Slope CD4 Nanuq Pad CD4-208 Plan: CD4-208A Plan: CD4-208Awp10 Standard Proposal Report 19 April, 2011 �'. HALLIBURTON Sperry Drilling Services ORtGtNAL Northing (5000 ft/in) I „ I I I I I I I 1 1 1 I 1 1 1 1 1 1 1 1 1 , 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 , I I 1 I I [ i 1 I i 1 1 , 1 1 ! 1 i 1 1 , 1 r - Vis;.;. '0 C - QU_ N to .a m W CD M NXi v1 O U — M O m m V V M O I U - _ O - IS( a = JO - O O. cr) N - O 3 m N N a — a CO o M 8 m 0 °o - - 3 d csc a Z n _ co o U - O c� g — m 4 a - U ° - co mo •�i Q— N 0V Si — - I- TC 8't a--: iii4,.>-* 4 - e co t LIJ _ .a ...to ,,,,,,,, 1..„. ,..,..*, _ 1.1.1 — .- ° I \ *11,71.4. g":3 — . Ili 0 • O U Q U v 4a H U ° IF - 0 — N ° Q i V d H 0 C O-o - Y N d — t th- MI C 3 - - "4Z RI - QL — . a+ Q — 4.a) - a V — Z O _ C O - U - -I I 1 1 1 1 1 1 1 1 1 1 7 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 I 1 1 1 1 I 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 ! 111111 1 1 1 1 1 (uM 0005) 6U143JON @ki,i §INAL § 8 2 2 R e 1 $ rv2e 8 :4 brv. rv18�a�moio V� a E6Ecife�qp� �,�x t;2�° I � I I___L 1 I I I I I I I I �S'«'�8 ooeq' LL ym°�aa mYn3a Z� 14 - 28420Noidni05 �8.g S d.u00MOOOMOOOP o p82828582ma 528 &2-2„ f - a 888,14M m rv& P i8.<8n2082588«V O n S LL AN N n r N 2,00285o18p8412 O g 0 tto c c —g O 8 ,<m88em o Wo MR88 ;^8e88 �Z 88o eo8o281 88m8888 8 O 0 ; p• IV L ua -4 h - e gAP oFE «RPOWF. O O N o M r am o F-LL O o a J T N 0 t „iv: _ 8m' 44m88LL s N F -° N 71 r M J 5988805282 $898 $8ffim& nN iV {y 8 .c m no O c o rvRv, 8unnn _ J J o p • y N N WiliNI88I$ X J OGN LL r 2 IN 0 4 n , h, Cu' v) � N — R rn N CC E 1 q J I , 00 i O 0 °o a9 _ _ 8 1 % `\ 1 1 $g 1 i s a ooh t I 4, I I I I I I I I I I 1 \ 1 R1 III es Ga - - m `v vI II v 'v *11 III doo e O -I� o �v v v I v ani a V - o 1 `,_.„,, , m 0 le.c\ o To,,11:%,`-1 —m 3 0 U tr 2 Y Itz w qirt Q _ `m0. vJ - N m G0 —a 0 X - V N t U N IV 11 o O O _ R 9 p 08681 o Ilr m . N g q J � __ I I I I I I I O - of p 0008E - o g o m a\ 0 T• N O C o (um oust')(+)4YoN/(-)43n0S . o.N \ \ 000L 1 g - q \ \ o O \ \ \ N c \ S —8 G o t N \ \ 00091 1 U - i3 u O r "7� m OLL o \ \ ! C D. CO m2 M4 Y x - m gal `\ \ \ ! - Z M 3'g q vi . .t - 0 I. i m2E i�rc 3 m S `v v00091 00 �mo9r, 8 o N N v v v Q Q 22141 — m O v - 0 02 ug n e o C o ® II �, _ N t in \ \\00041 M - 7 ❑ a i a x ® ❑ S 0 $ a 1— p ° ` \ r ,rt IaQ,E __qqqq *LER uar mu - 2 \6904 _ , _ ® =88 X888 $mY{; rv: 53w - v o 3 \\\ ` o - ami 4 4 N N \\\ I i!Y UJ f'� d aLrvEe3us,9S o N ` \\\ m t0 - $Se4 raG5 ' e O J 0) U € $ =,s so 0 vDoomv� ' x _ f IT a 5 U w88.8 ,d �s .;,--90 \\\ , AU Qy LL Ji $ 41 E Fill ._ m :828«^e0282S8ao N O -__LL n@ Z gee; k eVQm g3 c �rvrvervwrvenend ,, C • 6 b'� c 6 tlEN eem 3&�!- gym^ mwwm�n1QvHOgi $ O LL LL000*1�� N a” o ;§fiItz g w OM `add' ....N....�.rr _ o N N U - m z° d au b m Q 8 ^v88 " °'B��a88,oee«8`e�8 _ O _ _ _ 00 - w a m `? ~ J J Os I dzRm; � =���°e axe^ N N o o -- "".a": w a r °po I:" a _ 5s ^ mrsm o o N s e DO C �b3- m 3U' e7 wm O LL J m N \I �U U fL f,.1 O'u,Mm " 888 39„N °eaer�':B- o ~ O ` Opp ) .. ::: `8p98 �$��8&9 ry _ oo ! yN 52 oa,mm ..'m G.�' nWq q,�S� n - O N \ I . LL 8 3- v..,, 36 �nnm ogm$in F J , Op I O o 8m=8 Rt �Pn4=1wwg .40. o °s - 1 N —8 co 0) as 0 2 d mm2 n em n o — u) t a n - /� ��a�m Seun,,n^, - o %Ps Y 1 1 Y C) - V1 "\ --4 8 m-- mvmnem m 000.� m - i�f� ��oo 3n 89888 f%) d O 88 o6md�dr600tid - `O vo.� Q e �nmmm����.� o _� v `oe. m ml I �' R o-a 335 - Y ch a� -0-, ql , ,6 - a O .1, d $ �nn mmmnmmmw mm2 - O °� �/4 CJ N a m 1 ' J - gqU O O a. m " grvrvwmn,,,mmmmmmm oo 2 Y U U I ' O —e O W �A�eN,It 9 m - m o - f�U Ns {�. -a16i rn ` .1 1 i O ryo^ �7an<mm�mw�N-- N . m 91111 0 Y lSo - e7 vm S vv ain r, c `�^m oS� 1' a vv ,Q 111I/ n I I I I I I I E 1 i v I I I I L I 1 i W •I. I I e&ffim O n1 9 8 8 7 8 V (u!/i,000£)43de 1832J9A emu ORIGINAL O O LU N c- 0 O O —O O W •.... > 0 eo 0, O -t CCPCC oEl PoONE O O O LO O 000 O � --c- o O 00 O o O 000 O0 ` O—Lo O O 00 ! N co 0 00 e + 0 co O 00j N M O 0O 0X CO IOoOOO 000 I oc.1 7 JI T 0O -L X X N Q. co Lo cy) Q O 00o —O Lo CV 4111 O ® O 1"-- 0 V 1 O O —O O O O O O O O O 1 in O Lo O Lc, O N LO O N 1.0 1 i 1 r r c- (u!/i 0096 (+)upoN/(-)1.11noS 1 I CD 0 -o 01dMV8M7OO m 08681 1f O 0 —O CD 00081 ° , CO x C 0002.1- N 0 —o O 00091 N mW V a) 00091 0 o —o 0001 o c 0 000E I, 0 O N O o —O O 00021 co 0 4 00011 1r cei °0 °09C x 0 0 40 O U Cfl N 00oe (I) Tvs 0 000 U 0 VI'. 45 (9 > Om °°°e •i- 0009 Q00oCO 0 0 O °°°� o N o0 645) 441. oO ��` >/3 - 1 N o V X Op in 0 0 r N CD O O O O O O O 1 O O O O O O O O O O O O N N CO CO O (u!/-1 0006 Lildea IeO!}Jan anal . � lJ� GtNAL ConocoPhillips HALLIBURTON Standard Proposal Report Database: EDM v16 Prod Local Co-ordinate Raference;;.4,2.Well CD4-208 Company: ConocoPhillips(Alaska)Inc. TVD Reference: ''CD4-208 @ 55.95ft - Project: Western North Slope MD Reference: CD4-208 @ 55.95ft Site: CD4 Nanuq Pad North Reference: True Well: CD4-208 Survey Calculation Method: Minimum Curvature Wellbore: Plan:CD4-208A Design: CD4-208Awp10 Project Western North Slope Map System: US State Plane 1927(Exact solution) System Datum: Mean Sea Level Geo Datum: NAD 1927(NADCON CONUS) Using Well Reference Point Map Zone: Alaska Zone 04 Using geodetic scale factor Site CD4 Nanuq Pad Site Position: Northing: 5,957,908.57ft Latitude: 70° 17'36.666 N From: Map Easting: 377,794.25ft Longitude: 150°59'22.031 W Position Uncertainty: 0.00 ft Slot Radius: " Grid Convergence: -0.93 0 Well CD4-208,Alpine CD4 Well Position +N/-S 0.00 ft Northing: 5,957,492.98 ft Latitude: 70° 17'32.618 N 0.00 ft Easting: 378,038.29 ft Longitude: 150°59'14.723 W Position Uncertainty 0.00 ft Wellhead Elevation: ft Ground Level: 19.80ft • Wellbore Plan:CD4-208A Magnetics Model Name Sample Date Declination Dip Angle Field Strength (0) (0) (nT) BGGM2010 4/6/2011 16.16 79.68 57,304 Design CD4-208Awp10 Audit Notes: Version: Phase: PLAN Tie On Depth: 2,645.00 Vertical Section: Depth From(TVD) +14/-S +E/-W .. " : ,... - • Direction 1,0.::,•t.t,'!;4:'1; '' (ft) (ft) 'ifiLiti;lt::::;: stjti" [ 36.15 0.00 0.00 154.00 Plan Sections ,'IftlflItA1011titt. Measured Vertical ND Dogleg Build Turn Depth Inclination Azimuth Depth System +N/-S +E/-W Rate Rate Rate Tool Face (ft) (°) (°) (ft) ft (ft) (ft) cm ooft) (°nooft) (0/1ooft) (1 2,645.00 28.80 173.15 2,484.60 2,428.65 -723.07 109.96 0.00 0.00 0.00 0.00 2,695.00 28.15 173.94 2,528.55 2,472.60 -746.75 112.64 1.50 -1.29 1.59 150.00 2,895.00 29.09 182.06 2,704.18 2,648.23 -842.30 115.87 2.00 0.47 4.06 80.00 4,157.00 57.00 190.00 3,618.01 3,562.06 -1,687.40 10.77 2.25 2.21 0.63 14.10 8,955.76 58.01 191.53 6,195.95 6,140.00 -5,663.46 -745.32 0.03 0.02 0.03 52.16 10,067.56 57.50 158.54 6,801.00 6,745.05 -6,579.83 -666.40 2.50 -0.05 -2.97 -100.00 10,344.89 57.50 158.54 6,950.00 6,894.05 -6,797.51 -580.81 0.00 0.00 0.00 0.00 10,768.30 65.07 153.48 7,153.39 7,097.44 -7,136.11 -429.45 2.07 1.79 -1.19 -31.65 10,913.48 65.07 153.48 7,214.59 7,158.64 -7,253.90 -370.66 0.00 0.00 0.00 0.00 11,483.03 85.00 153.55 7,360.95 7,305.00 -7,743.91 -126.52 3.50 3.50 0.01 0.22 11,513.03 85.00 153.55 7,363.56 7,307.61 -7,770.67 -113.21 0.00 0.00 0.00 0.00 11,629.96 89.67 153.55 7,369.00 7,313.05 -7,875.22 -61.20 3.99 3.99 0.00 -0.02 18,980.66 89.68 153.55 7,410.95 7,355.00 -14,456.38 3,212.82 0.00 0.00 0.00 7.81 4/19/2011 2.44:03PM Pe IAL COMPASS 2003.16 Build 69 t.) HGIN ConocoPhillips HALLIBURTON Standard Proposal Report Database: EDM v16 Prod Local Co-ordinate Reference: Well CD4-208 Company: ConocoPhillips(Alaska)Inc. TVD Reference: CD4-208 @ 55.95ft Project: Western North Slope MD Reference: CD4-208 @ 55.95ft Site: CD4 Nanuq Pad North Reference: True Well: CD4-208 Survey Calculation Method: Minimum Curvature Wellbore: Plan:CD4-208A Design: CD4-208Awp10 I Planned Survey I Measured Vertical Map Map Depth Inclination Azimuth Depth TVDss +N/-S +EI-W Northing Easting DLS Vert Section (ft) (°) (°) (ft) ft (ft) (ft) (ft) (ft) 2,428.65 2,645.00 28.80 173.15 2,484.60 2,428.65 -723.07 109.96 5,956,768.28 378,136.50 0.72 698.09 KOP:Start DLS 1.50 TFO 150.00 2,695.00 28.15 173.94 2,528.55 2,472.60 -746.75 112.64 5,956,744.55 378,138.79 1.50 720.56 Start DLS 2.00 TFO 80.00 2,700.00 28.17 174.15 2,532.96 2,477.01 -749.10 112.89 5,956,742.20 378,139.00 2.00 722.78 2,800.00 28.58 178.27 2,620.95 2,565.00 -796.50 116.02 5,956,694.77 378,141.36 2.00 766.75 2,895.00 29.09 182.06 2,704.18 2,648.23 -842.30 115.87 5,956,648.98 378,140.47 2.00 807.85 Start DLS 2.25 TFO 14.10 2,900.00 29.20 182.12 2,708.54 2,652.59 -844.73 115.78 5,956,646.55 378,140.34 2.25 809.99 2,997.74 31.34 183.15 2,792.95 2,737.00 -893.94 113.51 5,956,597.39 378,137.27 2.25 853.22 C-20 3,000.00 31.39 183.17 2,794.88 2,738.93 -895.11 113.44 5,956,596.22 378,137.19 2.25 854.25 3,100.00 33.58 184.09 2,879.23 2.823.28 -948.70 110.03 5,956,542.69 378,132.90 2.25 900.92 3,200.00 35.78 184.92 2,961.46 2,905.51 -1,005.42 105.55 5,956,486.06 378,127.50 2.25 949.94 3,300.00 37.98 185.66 3,041.45 2,985.50 -1,065.18 100.01 5,956,426.41 378,121.00 2.25 1,001.22 3,400.00 40.19 186.33 3,119.06 3,063.11 -1,127.88 93.42 5,956,363.82 378,113.39 2.25 1,054.68 3,500.00 42.41 186.94 3,194.18 3,138.23 -1,193.43 85.79 5,956,298.41 378,104.70 2.25 1,110.26 3,600.00 44.62 187.50 3,266.70 3,210.75 -1,261.73 77.13 5,956,230.26 378,094.94 2.25 1,167.85 3,700.00 46.84 188.02 3,336.50 3,280.55 -1,332.68 67.46 5,956,159.49 378,084.11 2.25 1,227.37 3,800.00 49.06 188.50 3,403.47 3,347.52 -1,406.16 56.78 5,956,086.20 378,072.25 2.25 1,288.74 3,900.00 51.28 188.96 3,467.52 3.411.57 -1,482.06 45.12 5,956,010.51 378,059.36 2.25 1,351.84 4,000.00 53.51 189.38 3,528.54 3,472.59 -1,560.26 32.50 5,955,932.52 378,045.47 2.25 1,416.60 4,100.00 55.73 189.78 3,586.44 3,530.49 -1,640.65 18.93 5,955,852.37 378,030.59 2.25 1,482.90 1 4,157.00 57.00 190.00 3,618.01 3,562.06 -1,687.40 10.77 5,955,805.76 378,021.68 2.25 1,521.35 Start DLS 0.03 TFO 51.92 4,200.00 57.01 190.01 3,641.43 3,585.48 -1,722.92 4.51 5,955,770.36 378,014.84 0.03 1,550.52 4,300.00 57.03 190.05 3,695.86 3,639.91 -1,805.52 -10.10 5,955,688.01 377,998.90 0.03 1,618.36 4,400.00 57.05 190.08 3,750.27 3,694.32 -1,888.13 -24.76 5,955,605.65 377,982.90 0.03 1,686.19 4,500.00 57.07 190.11 3,804.64 3,748.69 -1,970.76 -39.47 5,955,523.28 377,966.85 0.03 1,754.00 4,544.73 57.08 190.12 3,828.95 3.773.00 -2,007.72 -46.07 5,955,486.43 377,959.66 0.03 1,784.33 K-3 Marker 4,600.00 57.09 190.14 3,858.98 3.803.03 -2,053.40 -54.23 5,955,440.90 377,950.76 0.03 1,821.81 4,700.00 57.11 190.17 3,913.30 3.857.35 -2,136.05 -69.04 5,955,358.51 377,934.61 0.03 1,889.60 4,800.00 57.13 190.21 3,967.58 3,911.63 -2,218.71 -83.90 5,955,276.11 377,918.41 0.03 1,957.38 4,900.00 57.16 190.24 4,021.83 3.965.88 -2,301.38 -98.81 5,955,193.69 377,902.17 0.03 2,025.15 4,946.33 57.17 190.25 4,046.95 3,991.00 -2,339.68 -105.73 5,955,155.51 377,894.62 0.03 2,056.54 Basal K-3 5,000.00 57.18 190.27 4,076.05 4,020.10 -2,384.06 -113.76 5,955,111.27 377,885.87 0.03 2,092.91 5,014.58 57.18 190.27 4,083.95 4,028.00 -2,396.12 -115.95 5,955,099.26 377,883.49 0.03 2,102.79 K-2 Qannik 5,100.00 57.20 190.30 4,130.24 4,074.29 -2,466.76 -128.77 5,955,028.84 377,869.53 0.03 2,160.66 5,200.00 57.22 190.33 4,184.40 4,128.45 -2,549.46 -143.83 5,954,946.40 377,853.13 0.03 2,228.39 5,217.65 57.22 190.34 4,193.95 4,138.00 -2,564.06 -146.49 5,954,931.85 377,850.23 0.03 2,240.34 Basal K-2 5,300.00 57.24 190.37 4,238.52 4,182.57 -2,632.18 -158.94 5,954,863.94 377.836.68 0.03 2,296.11 4/19/2011 2.44.03PM Page 3 COMPASS 2003.16 Build 69 ConocoPhillips HALLIBU " TON Standard Proposal Report Database: EDM v16 Prod Local Co-ordinate Reference: Well CD4-208 Company: ConocoPhillips(Alaska)Inc. TVD Reference: CD4-208 @ 55.95ft Project: Western North Slope MD Reference: CD4-208 @ 55.95ft Site: CD4 Nanuq Pad North Reference: True Well: CD4-208 Survey Calculation Method: Minimum Curvature Wellbore: Plan:CD4-208A Design: CD4-208Awp10 Planned Survey Measured Vertical Map Map Depth Inclination Azimuth Depth TVDss +N/-S +E/-W Northing Easting DLS Vert Section (ft) (°) (°) (ft) ft (ft) (ft) (ft) (ft) 4,236.67 5,400.00 57.26 190.40 4,292.62 4,236.67 -2,714.90 -174.09 5,954,781.48 377,820.19 0.03 2,363.82 5,500.00 57.28 190.43 4,346.69 4,290.74 -2,797.64 -189.30 5,954,699.01 377,803.64 0.03 2,431.52 5,600.00 57.30 190.46 4,400.72 4,344.77 -2,880.39 -204.56 5,954,616.52 377,787.05 0.03 2,499.21 5,700.00 57.32 190.49 4,454.73 4.398.78 -2,963.15 -219.86 5,954,534.03 377,770.40 0.03 2,566.88 5,800.00 57.35 190.53 4,508.70 4,452.75 -3,045.92 -235.22 5,954,451.52 377,753.71 0.03 2,634.54 5,900.00 57.37 190.56 4,562.64 4,506.69 -3,128.71 -250.63 5,954,369.01 377,736.96 0.03 2,702.20 6,000.00 57.39 190.59 4,616.55 4,560.60 -3,211.50 -266.08 5,954,286.48 377,720.17 0.03 2,769.83 6,100.00 57.41 190.62 4,670.43 4,614.48 -3,294.30 -281.59 5,954,203.95 377,703.32 0.03 2,837.46 6,200.00 57.43 190.65 4,724.28 4,668.33 -3,377.12 -297.14 5,954,121.40 377,686.43 0.03 2,905.08 6,300.00 57.45 190.69 4,778.10 4,722.15 -3,459.94 -312.74 5,954,038.85 377,669.48 0.03 2,972.68 6,400.00 57.47 190.72 4,831.89 4,775.94 -3,542.78 -328.40 5,953,956.28 377,652.49 0.03 3,040.27 6,500.00 57.49 190.75 4,885.64 4,829.69 -3,625.63 -344.10 5,953,873.71 377,635.44 0.03 3,107.85 6,600.00 57.51 190.78 4,939.37 4,883.42 -3,708.49 -359.86 5,953,791.12 377,618.35 0.03 3,175.42 6,700.00 57.54 190.81 4,993.06 4,937.11 -3,791.35 -375.66 5,953,708.53 377,601.20 0.03 3.242.97 6,800.00 57.56 190.84 5,046.72 4,990.77 -3,874.23 -391.51 5,953,625.93 377,584.01 0.03 3,310.51 6,900.00 57.58 190.88 5,100.36 5,044.41 -3,957.12 -407.41 5,953,543.31 377,566.77 0.03 3,378.04 7,000.00 57.60 190.91 5,153.96 5,098.01 -4,040.03 -423.37 5,953,460.69 377,549.47 0.03 3,445.56 7,100.00 57.62 190.94 5,207.52 5,151.57 -4,122.94 -439.37 5,953,378.05 377,532.13 0.03 3,513.07 7,200.00 57.64 190.97 5,261.06 5,205.11 -4,205.86 -455.42 5,953,295.41 377,514.74 0.03 3,580.56 7,300.00 57.66 191.00 5,314.57 5.258.62 -4,288.79 -471.52 5,953,212.76 377,497.29 0.03 3,648.04 7,400.00 57.68 191.03 5,368.04 5,312.09 -4,371.73 -487.67 5,953,130.09 377,479.80 0.03 3,715.51 7,500.00 57.70 191.07 5,421.49 5,365.54 -4,454.69 -503.87 5,953,047.42 377,462.26 0.03 3,782.97 7,600.00 57.73 191.10 5,474.90 5,418.95 -4,537.65 -520.12 5,952,964.74 377,444.67 0.03 3,850.41 7,700.00 57.75 191.13 5,528.28 5,472.33 -4,620.63 -536.42 5,952,882.04 377,427.02 0.03 3,917.84 7,800.00 57.77 191.16 5,581.63 5,525.68 -4,703.61 -552.77 5,952,799.34 377,409.33 0.03 3,985.26 7,900.00 57.79 191.19 5,634.95 5,579.00 -4,786.61 -569.17 5,952,716.63 377,391.59 0.03 4,052.67 8,000.00 57.81 191.22 5,688.24 5,632.29 -4,869.61 -585.61 5,952,633.91 377,373.80 0.03 4,120.06 8,100.00 57.83 191.26 5,741.50 5,685.55 -4,952.63 -602.11 5,952,551.18 377,355.96 0.03 4,187.44 8,200.00 57.85 191.29 5,794.72 5,738.77 -5,035.65 -618.66 5,952,468.44 377,338.07 0.03 4,254.81 8,300.00 57.87 191.32 5,847.91 5.791.96 -5,118.69 -635.26 5,952,385.69 377,320.13 0.03 4,322.17 8,352.73 57.89 191.34 5,875.95 5.820.00 -5,162.48 -644.03 5,952,342.05 377,310.65 0.03 4,357.68 Albian 97 8,400.00 57.90 191.35 5,901.07 5,845.12 -5,201.74 -651.90 5,952,302.93 377.302.14 0.03 4,389.52 8,500.00 57.92 191.38 5,954.20 5,898.25 -5,284.79 -668.60 5,952,220.16 377.284.10 0.03 4,456.85 8,600.00 57.94 191.41 6,007.30 5,951.35 -5,367.86 -685.34 5,952,137.39 377,266.01 0.03 4,524.17 8,700.00 57.96 191.44 6,060.37 6,004.42 -5,450.94 -702.14 5,952,054.60 377,247.87 0.03 4,591.47 8,800.00 57.98 191.48 6,113.41 6.057.46 -5,534.02 -718.98 5,951,971.80 377,229.68 0.03 4,658.77 8,900.00 58.00 191.51 6,166.41 6,110.46 -5,617.12 -735.88 5,951,889.00 377,211.44 0.03 4,726.05 8,951.98 58.01 191.52 6,193.95 6,138.00 -5,660.32 -744.68 5,951,845.95 377,201.94 0.03 4,761.02 Albian 96 8,955.68 58.01 191.53 6,195.91 6,139.96 -5,663.40 -745.31 5,951,842.89 377,201.27 0.04 4,763.51 Start DLS 2.50 TFO-100.00 8,955.76 58.01 191.53 6,195.95 6,140.00 -5,663.46 -745.32 5,951,842.83 377.201.25 0.03 4,763.56 CD4-208A 07Feb11 Nanuq 9,000.00 57.83 190.24 6,219.45 6,163.50 -5,700.27 -752.40 5,951,806.14 377,193.58 2.50 4,793.54 4/19/2011 2..44:03PM Page 4 COMPASS 2003.16 Build 69 ConocoPhillips HALLIBURTON Standard Proposal Report Database: EDM v16 Prod Local Co-ordinate Reference: Well CD4-208 Company: ConocoPhillips(Alaska)Inc. TVD Reference: CD4-208 @ 55.95ft Project: Western North Slope MD Reference: CD4-208 @ 55.95ft Site: CD4 Nanuq Pad North Reference: True Well: CD4-208 Survey Calculation Method: Minimum Curvature Wellbore: Plan:CD4-208A Design: CD4-208Awp10 Planned Survey Measured Vertical Map Map Depth Inclination Azimuth Depth TVDss +Ni-S +E/-W Northing Easting DLS Vert Section (ft) (°) (°) (ft) ft (ft) (ft) (ft) (ft) 6,217.03 9,100.00 57.46 187.31 6,272.98 6,217.03 -5,783.74 -765.28 5,951,722.89 377,179.34 2.50 4,862.91 9,200.00 57.15 184.36 6,327.00 6,271.05 -5,867.45 -773.85 5,951,639.34 377,169.42 2.50 4,934.39 9,300.00 56.92 181.40 6,381.41 6,325.46 -5,951.23 -778.06 5,951,555.65 377,163.85 2.50 5,007.85 9,400.00 56.76 178.42 6,436.12 6,380.17 -6,034.93 -777.93 5,951,471.96 377,162.63 2.50 5,083.14 9,500.00 56.67 175.43 6,491.01 6,435.06 -6,118.39 -773.44 5,951,388.45 377,165.76 2.50 5,160.12 9,600.00 56.65 172.43 6,545.98 6,490.03 -6,201.44 -764.61 5,951,305.27 377,173.24 2.50 5,238.64 9,700.00 56.70 169.44 6,600.93 6,544.98 -6,283.94 -751.45 5,951,222.57 377,185.06 2.50 5,318.56 9,800.00 56.82 166.46 6,655.75 6,599.80 -6,365.72 -733.99 5,951,140.53 377,201.19 2.50 5,399.72 9,900.00 57.02 163.48 6,710.34 6,654.39 -6,446.64 -712.26 5,951,059.28 377,221.60 2.50 5,481.96 10,000.00 57.28 160.52 6,764.59 6,708.64 -6,526.52 -686.31 5,950,978.99 377,246.25 2.50 5,565.14 10,067.45 57.50 158.54 6,800.94 6,744.99 -6,579.75 -666.44 5,950,925.45 377,265.25 2.50 5,621.69 Start 277.32 hold at 10067.45 MD 10,067.56 57.50 158.54 6,801.00 6,745.05 -6,579.83 -666.40 5,950,925.37 377,265.28 2.50 5,621.78 10,076.78 57.50 158.54 6,805.95 6,750.00 -6,587.07 -663.56 5,950,918.09 377,268.01 0.00 5,629.53 HRZ 10,100.00 57.50 158.54 6,818.43 6,762.48 -6,605.30 -656.39 5,950,899.75 377,274.88 0.00 5,649.06 10,200.00 57.50 158.54 6,872.16 6,816.21 -6,683.79 -625.53 5,950,820.77 377,304.46 0.00 5,733.13 10,300.00 57.50 158.54 6,925.88 6.869.93 -6,762.28 -594.67 5,950,741.80 377,334.04 0.00 5,817.21 10,318.74 57.50 158.54 6,935.95 6,880.00 -6,776.99 -588.88 5,950,727.00 377,339.59 0.00 5,832.97 Base HRZ 10,344.77 57.50 158.54 6,949.94 6.893.99 -6,797.42 -580.85 5,950,706.44 377,347.29 0.00 5,854.85 Start DLS 2.07 TFO-31.53 10,344.89 57.50 158.54 6,950.00 6,894.05 -6,797.51 -580.81 5,950,706.35 377,347.32 0.00 5,854.95 10,400.00 58.48 157.83 6,979.21 6.923.26 -6,840.90 -563.45 5,950,662.69 377,363.98 2.07 5,901.56 10,432.27 59.05 157.43 6,995.95 6.940.00 -6,866.41 -552.95 5,950,637.01 377,374.07 2.07 5,929.09 K-1 Marker 10,500.00 60.25 156.60 7,030.17 6,974.22 -6,920.21 -530.12 5,950,582.85 377,396.02 2.07 5,987.46 10,600.00 62.04 155.40 7,078.43 7,022.48 -7,000.21 -494.49 5,950,502.29 377,430.34 2.07 6,074.98 10,607.52 62.17 155.31 7,081.95 7,026.00 -7,006.25 -491.72 5,950,496.21 377,433.02 2.07 6,081.62 Kuparuk C 10,616.11 62.33 155.21 7,085.95 7,030.00 -7,013.16 -488.54 5,950,489.25 377,436.08 2.07 6,089.22 LCU-Miluveach 10,700.00 63.83 154.25 7,123.93 7,067.98 -7,080.80 -456.60 5,950,421.11 377,466.92 2.07 6,164.02 10,766.97 65.04 153.49 7,152.83 7.096.88 -7,135.03 -429.99 5,950,366.45 377,492.64 2.07 6,224.43 Start 145.96 hold at 10766.97 MD 10,768.30 65.07 153.48 7,153.39 7,097.44 -7,136.11 -429.45 5,950,365.37 377,493.16 2.07 6,225.63 10,800.00 65.07 153.48 7,166.75 7,110.80 -7,161.83 -416.61 5,950,339.44 377,505.58 0.00 6,254.38 10,900.00 65.07 153.48 7,208.91 7,152.96 -7,242.97 -376.12 5,950,257.67 377,544.75 0.00 6,345.05 10,912.92 65.07 153.48 7,214.36 7,158.41 -7,253.45 -370.89 5,950,247.10 377,549.81 0.00 6,356.77 Start DLS 3.50 TFO 0.17 10,913.48 65.07 153.48 7,214.59 7,158.64 -7,253.90 -370.66 5,950,246.64 377,550.03 0.00 6,357.28 11,000.00 68.09 153.49 7,248.98 7,193.03 -7,324.94 -335.22 5,950,175.05 377,584.31 3.50 6,436.66 11,100.00 71.59 153.50 7,283.43 7,227.48 -7,408.93 -293.33 5,950,090.39 377,624.82 3.50 6,530.52 11,200.00 75.09 153.52 7,312.09 7,256.14 -7,494.66 -250.61 5,950,003.99 377,666.15 3.50 6,626.30 11,300.00 78.59 153.53 7,334.85 7,278.90 -7,581.81 -207.20 5,949,916.15 377,708.14 3.50 6,723.66 4/19/2011 2.44:03PM Page 5 COMPASS 2003.16 Build 69 ConocoPhillips HALLI B U RTO NI Standard Proposal Report Database: EDM v16 Prod Local Co-ordinate Reference: Well CD4-208 Company: ConocoPhillips(Alaska)Inc. TVD Reference: CD4-208 @ 55.95ft Project: Western North Slope MD Reference: CD4-208 @ 55.95ft Site: CD4 Nanuq Pad North Reference: True Well: CD4-208 Survey Calculation Method: Minimum Curvature Wellbore: Plan:CD4-208A Design: CD4-208Awp10 Planned Survey Measured Vertical Map Map Depth Inclination Azimuth Depth TVDss +N/-S +E/-W Northing Easting DLS Vert Section (ft) (°) (°) (ft) ft (ft) (ft) (ft) (ft) 7,285.00 11,332.45 79.73 153.53 7,340.95 7,285.00 -7,610.34 -192.99 5,949,887.40 377,721.88 3.50 6,755.53 Alpine D 11,400.00 82.09 153.54 7,351.62 7,295.67 -7,670.05 -163.27 5,949,827.22 377,750.62 3.50 6,822.22 11,434.04 83.29 153.55 7,355.95 7,300.00 -7,700.27 -148.23 5,949,796.76 377,765.17 3.50 6,855.98 Alpine C 11,482.89 84.99 153.55 7,360.94 7,304.99 -7,743.78 -126.58 5,949,752.91 377,786.11 3.50 6,904.58 Start 30.00 hold at 11482.89 MD-7"x 8-3/4" 11,483.03 85.00 153.55 7,360.95 7,305.00 -7,743.91 -126.52 5,949,752.78 377,786.17 3.50 6,904.72 CD4-208A 07Feb11 Heel South 11,500.00 85.00 153.55 7,362.43 7,306.48 -7,759.04 -118.99 5,949,737.53 377,793.45 0.00 6,921.62 11,512.89 85.00 153.55 7,363.55 7,307.60 -7,770.54 -113.27 5,949,725.94 377,798.98 0.00 6,934.46 Start DLS 3.99 TFO-0.02 11,513.03 85.00 153.55 7,363.56 7,307.61 -7,770.67 -113.21 5,949,725.81 377.799.04 0.00 6,934.60 11,582.72 87.78 153.55 7,367.95 7,312.00 -7,832.93 -82.24 5,949,663.06 377,829.00 3.99 7,004.14 UJU 11,600.00 88.47 153.55 7,368.51 7,312.56 -7,848.39 -74.54 5,949,647.48 377,836.44 3.99 7,021.41 11,629.82 89.66 153.55 7,369.00 7,313.05 -7,875.09 -61.26 5,949,620.57 377,849.28 3.99 7,051.23 Start DLS 0.00 TFO-59.78 11,629.96 89.67 153.55 7,369.00 7,313.05 -7,875.22 -61.20 5,949,620.44 377,849.34 3.99 7,051.37 11,700.00 89.67 153.55 7,369.40 7:313.45 -7,937.92 -30.00 5,949,557.25 377,879.52 0.00 7,121.40 11,800.00 89.67 153.55 7,369.98 7,314.03 -8,027.45 14.54 5,949,467.01 377,922.59 0.00 7,221.40 11,900.00 89.67 153.55 7,370.55 7,314.60 -8,116.98 59.08 5,949,376.78 377,965.67 0.00 7,321.39 12,000.00 89.67 153.55 7,371.13 7,315.18 -8,206.51 103.62 5,949,286.54 378,008.75 0.00 7,421.39 12,100.00 89.67 153.55 7,371.71 7,315.76 -8,296.05 148.16 5,949,196.31 378,051.83 0.00 7,521.39 12,200.00 89.67 153.55 7,372.28 7,316.33 -8,385.58 192.70 5,949,106.07 378.094.91 0.00 7,621.38 12,300.00 89.67 153.55 7,372.86 7,316.91 -8,475.11 237.24 5,949,015.84 378,137.99 0.00 7,721.38 12,400.00 89.67 153.55 7,373.43 7,317.48 -8,564.64 281.78 5,948,925.61 378,181.07 0.00 7,821.37 12,500.00 89.67 153.55 7,374.01 7,318.06 -8,654.17 326.32 5,948,835.37 378,224.15 0.00 7,921.37 12,600.00 89.67 153.55 7,374.58 7,318.63 -8,743.70 370.86 5,948,745.14 378,267.22 0.00 8,021.36 12,700.00 89.67 153.55 7,375.15 7,319.20 -8,833.23 415.40 5,948,654.90 378,310.30 0.00 8,121.36 12,800.00 89.67 153.55 7,375.73 7,319.78 -8,922.76 459.94 5,948,564.67 378,353.38 0.00 8,221.35 12,900.00 89.67 153.55 7,376.30 7,320.35 -9,012.29 504.49 5,948,474.43 378,396.46 0.00 8,321.35 13,000.00 89.67 153.55 7,376.88 7,320.93 -9,101.82 549.03 5,948,384.20 378,439.54 0.00 8,421.34 13,100.00 89.67 153.55 7,377.45 7,321.50 -9,191.36 593.57 5,948,293.97 378,482.62 0.00 8,521.34 13,200.00 89.67 153.55 7,378.03 7,322.08 -9,280.89 638.11 5,948,203.73 378,525.70 0.00 8,621.33 13,300.00 89.67 153.55 7,378.60 7,322.65 -9,370.42 682.65 5,948,113.50 378,568.78 0.00 8,721.33 13,400.00 89.67 153.55 7,379.17 7,323.22 -9,459.95 727.19 5,948,023.26 378,611.85 0.00 8,821.32 13,500.00 89.67 153.55 7,379.75 7.323.80 -9,549.48 771.73 5,947,933.03 378,654.93 0.00 8,921.32 13,600.00 89.67 153.55 7,380.32 7,324.37 -9,639.01 816.27 5,947,842.79 378,698.01 0.00 9,021.31 13,700.00 89.67 153.55 7,380.89 7,324.94 -9,728.54 860.81 5,947,752.56 378,741.09 0.00 9,121.31 13,800.00 89.67 153.55 7,381.46 7,325.51 -9,818.07 905.35 5,947,662.33 378,784.17 0.00 9,221.30 13,900.00 89.67 153.55 7,382.04 7,326.09 -9,907.60 949.89 5,947,572.09 378,827.25 0.00 9,321.30 14,000.00 89.67 153.55 7,382.61 7,326.66 -9,997.13 994.43 5,947,481.86 378,870.33 0.00 9,421.30 I 14,100.00 89.67 153.55 7,383.18 7,327.23 -10,086.67 1,038.97 5,947,391.62 378,913.40 0.00 9,521.29 14,200.00 89.67 153.55 7,383.75 7,327.80 -10,176.20 1,083.51 5,947,301.39 378,956.48 0.00 9,621.29 4/19/2011 2:44:03PM Page 6 COMPASS 2003.16 Build 69 QRU' AL ConocoPhillips HALLIBURTON Standard Proposal Report Database: EDM v16 Prod Local Co-ordinate Reference: Well CD4-208 Company: ConocoPhillips(Alaska)Inc. TVD Reference: CD4-208 @ 55.95ft Project: Western North Slope MD Reference: CD4-208 @ 55.95ft Site: CD4 Nanuq Pad North Reference: True Well: CD4-208 Survey Calculation Method: Minimum Curvature Wellbore: Plan:CD4-208A Design: CD4-208Awp10 Planned Survey Measured Vertical Map Map Depth Inclination Azimuth Depth TVDss +NI-S +EI-W Northing Easting DLS Vert Section (ft) (°) (0) (ft) ft (ft) (ft) (ft) (ft) 7,328.38 14,300.00 89.67 153.55 7,384.33 7,328.38 -10,265.73 1,128.05 5,947,211.15 378,999.56 0.00 9,721.28 14,400.00 89.67 153.55 7,384.90 7,328.95 -10,355.26 1,172.59 5,947,120.92 379,042.64 0.00 9,821.28 14,500.00 89.67 153.55 7,385.47 7,329.52 -10,444.79 1,217.13 5,947,030.68 379,085.72 0.00 9,921.27 14,600.00 89.67 153.55 7,386.04 7,330.09 -10,534.32 1,261.68 5,946,940.45 379,128.80 0.00 10,021.27 14,700.00 89.67 153.55 7,386.61 7,330.66 -10,623.85 1,306.22 5,946,850.22 379,171.87 0.00 10,121.26 14,800.00 89.67 153.55 7,387.19 7,331.24 -10,713.38 1,350.76 5,946,759.98 379.214.95 0.00 10,221.26 14,900.00 89.67 153.55 7,387.76 7,331.81 -10,802.91 1,395.30 5,946,669.75 379,258.03 0.00 10,321.25 15,000.00 89.67 153.55 7,388.33 7,332.38 -10,892.45 1,439.84 5,946,579.51 379,301.11 0.00 10,421.25 15,100.00 89.67 153.55 7,388.90 7,332.95 -10,981.98 1,484.38 5,946,489.28 379,344.19 0.00 10,521.24 15,200.00 89.67 153.55 7,389.47 7,333.52 -11,071.51 1,528.92 5,946,399.04 379,387.27 0.00 10.621.24 15,300.00 89.67 153.55 7,390.04 7,334.09 -11,161.04 1,573.46 5,946,308.81 379,430.34 0.00 10,721.23 15,400.00 89.67 153.55 7,390.61 7,334.66 -11,250.57 1,618.00 5,946,218.57 379,473.42 0.00 10,821.23 j 15,500.00 89.67 153.55 7,391.18 7,335.23 -11,340.10 1,662.54 5,946,128.34 379,516.50 0.00 10,921.22 ' 15,600.00 89.67 153.55 7,391.75 7,335.80 -11,429.63 1,707.08 5,946,038.10 379,559.58 0.00 11,021.22 15,700.00 89.67 153.55 7,392.32 7,336.37 -11,519.16 1,751.62 5,945,947.87 379,602.66 0.00 11,121.22 15,800.00 89.67 153.55 7,392.89 7,336.94 -11,608.70 1,796.16 5,945,857.64 379,645.74 0.00 11,221.21 15,900.00 89.67 153.55 7,393.46 7,337.51 -11,698.23 1,840.70 5,945,767.40 379.688.81 0.00 11,321.21 16,000.00 89.67 153.55 7,394.03 7,338.08 -11,787.76 1,885.24 5,945,677.17 379,731.89 0.00 11,421.20 16,100.00 89.67 153.55 7,394.60 7,338.65 -11,877.29 1,929.78 5,945,586.93 379,774.97 0.00 11,521.20 16,200.00 89.67 153.55 7,395.17 7,339.22 -11,966.82 1,974.32 5,945,496.70 379,818.05 0.00 11,621.19 16,300.00 89.67 153.55 7,395.74 7,339.79 -12,056.35 2,018.86 5,945,406.46 379,861.13 0.00 11,721.19 16,400.00 89.67 153.55 7,396.31 7,340.36 -12,145.88 2,063.40 5,945,316.23 379,904.21 0.00 11,821.18 16,500.00 89.67 153.55 7,396.88 7,340.93 -12,235.41 2,107.94 5,945,225.99 379,947.28 0.00 11,921.18 16,600.00 89.67 153.55 7,397.45 7,341.50 -12,324.95 2,152.48 5,945,135.76 379,990.36 0.00 12,021.17 16,700.00 89.67 153.55 7,398.02 7,342.07 -12,414.48 2,197.02 5,945,045.52 380,033.44 0.00 12,121.17 16,800.00 89.67 153.55 7,398.59 7,342.64 -12,504.01 2,241.56 5,944,955.29 380,076.52 0.00 12,221.16 16,900.00 89.67 153.55 7,399.15 7,343.20 -12,593.54 2,286.10 5,944,865.05 380,119.60 0.00 12,321.16 17,000.00 89.67 153.55 7,399.72 7,343.77 -12,683.07 2,330.64 5,944,774.82 380,162.67 0.00 12,421.15 17,100.00 89.67 153.55 7,400.29 7,344.34 -12,772.60 2,375.18 5,944,684.59 380,205.75 0.00 12,521.15 17,200.00 89.67 153.55 7,400.86 7,344.91 -12,862.13 2,419.72 5,944,594.35 380,248.83 0.00 12,621.14 17,300.00 89.67 153.55 7,401.43 7.345.48 -12,951.67 2,464.26 5,944,504.12 380,291.91 0.00 12,721.14 17,400.00 89.67 153.55 7,401.99 7.346.04 -13,041.20 2,508.80 5,944,413.88 380,334.99 0.00 12,821.14 17,500.00 89.67 153.55 7,402.56 7,346.61 -13,130.73 2,553.34 5,944,323.65 380,378.06 0.00 12,921.13 17,600.00 89.67 153.55 7,403.13 7,347.18 -13,220.26 2,597.88 5,944,233.41 380,421.14 0.00 13,021.13 17,700.00 89.67 153.55 7,403.70 7.347.75 -13,309.79 2,642.42 5,944,143.18 380,464.22 0.00 13,121.12 17,800.00 89.68 153.55 7,404.26 7,348.31 -13,399.32 2,686.96 5,944,052.94 380,507.30 0.00 13,221.12 17,900.00 89.68 153.55 7,404.83 7,348.88 -13,488.85 2,731.50 5,943,962.71 380,550.37 0.00 13,321.11 18,000.00 89.68 153.55 7,405.40 7.349.45 -13,578.39 2,776.04 5,943,872.47 380,593.45 0.00 13,421.11 18,100.00 89.68 153.55 7,405.96 7,350.01 -13,667.92 2,820.58 5,943,782.24 380,636.53 0.00 13,521.10 18,200.00 89.68 153.55 7,406.53 7,350.58 -13,757.45 2,865.12 5,943,692.00 380,679.61 0.00 13,621.10 18,300.00 89.68 153.55 7,407.10 7,351.15 -13,846.98 2,909.66 5,943,601.77 380,722.69 0.00 13,721.09 , 18,400.00 89.68 153.55 7,407.66 7,351.71 -13,936.51 2,954.20 5,943,511.53 380,765.76 0.00 13,821.09 18,500.00 89.68 153.55 7,408.23 7,352.28 -14,026.04 2,998.74 5,943,421.30 380,808.84 0.00 13,921.08 18,600.00 89.68 153.55 7,408.80 7.352.85 -14,115.57 3,043.28 5,943,331.06 380,851.92 0.00 14,021.08 18,700.00 89.68 153.55 7,409.36 7,353.41 -14,205.11 3,087.82 5,943,240.83 380,895.00 0.00 14,121.07 4/19/2011 2..44:03PM Page 7 COMPASS 2003.16 Build 69 : '. i ) NAL ConocoPhillips HALLIBURTOFJ Standard Proposal Report Database: EDM v16 Prod Local Co-ordinate Reference: Well CD4-208 Company: ConocoPhillips(Alaska)Inc. TVD Reference: CD4-208 @ 55.95ft Project: Western North Slope MD Reference: CD4-208 @ 55.95ft Site: CD4 Nanuq Pad North Reference: True Well: CD4-208 Survey Calculation Method: Minimum Curvature Wellbore: Plan:CD4-208A Design: CD4-208Awp10 Planned Survey 1 I Measured Vertical Map Map ' Depth Inclination Azimuth Depth TVDss +N/-S +E/-W Northing Easting DLS Vert Section (ft) (°) (°) (ft) ft (ft) (ft) (ft) (ft) 7,353.98 18,800.00 89.68 153.55 7,409.93 7,353.98 -14,294.64 3,132.36 5,943,150.59 380,938.07 0.00 14,221.07 18,900.00 89.68 153.55 7,410.49 7,354.54 -14,384.17 3,176.90 5,943,060.36 380,981.15 0.00 14,321.07 18,980.44 89.68 153.55 7,410.95 7,355.00 -14,456.19 3,212.72 5,942,987.77 381,015.80 0.00 14,401.50 TD at 18980.44-4-1/2"x 6-1/8" 18,980.66 89.68 153.55 7,410.95 . 7,355.00 -14,456.38 3,212.82 5,942,987.58 381,015.90 0.03 14,401.72 CD4-208A 09Mar11 Toe Targets Target Name -hit/miss target Dip Angle Dip Dir. TVD +N/-S +E/-W Northing Easting -Shape (°) (°) (ft) (ft) (ft) (ft) (ft) CD4-208A 09Mar11 Toe 0.00 0.00 7,410.95 -14,456.38 3,212.82 5,942,987.58 381,015.90 -plan hits target center -Circle(radius 100.00) CD4-208A 07Feb11 Heel South 0.00 0.00 7,360.95 -7,743.91 -126.52 5,949,752.78 377,786.17 -plan hits target center -Circle(radius 100.00) CD4-208A 07Feb11 Nanuq 0.00 0.00 6,195.95 -5,663.46 -745.32 5,951,842.83 377,201.25 -plan hits target center -Circle(radius 100.00) Casing Points Measured Vertical Casing Hole Depth Depth Diameter Diameter (ft) (ft) Name C') C') 2,594.33 2,440.21 9 5/8"x 12 1/4" 9-5/8 12-1/4 11,482.89 7,360.94 7"x 8-3/4" 7 8-3/4 18,980.44 7,410.95 4-1/2"x6-1/8" 4-1/2 6-1/8 4/19/2011 2:44.03PM Page 8 COMPASS 2003.16 Build 69 & NAL • ConocoPhillips HALLIBURTON Standard Proposal Report Database: EDM v16 Prod Local Co-ordinate Reference: Well CD4-208 Company: ConocoPhillips(Alaska)Inc. TVD Reference: CD4-208 @ 55.95ft Project: Western North Slope MD Reference: CD4-208 @ 55.95ft Site: CD4 Nanuq Pad North Reference: True Well: CD4-208 Survey Calculation Method: Minimum Curvature Wellbore: Plan:CD4-208A Design: CD4-208Awp10 Formations Measured Vertical Vertical Dip Depth Depth Depth SS Dip Direction (ft) (ft) ft Name Lithology (`) (°) 10,616.11 7,085.95 LCU-Miluveach 11,582.72 7,367.95 UJU 11,434.04 7,355.95 Alpine C 10,076.78 6,805.95 HRZ 10.432.27 6,995.95 K-1 Marker 5,014.58 4,083.95 K-2 Qannik 8,352.73 5,875.95 Albian 97 10,607.52 7,081.95 Kuparuk C 4,544.73 3,828.95 K-3 Marker 2,997.74 2,792.95 C-20 10,318.74 6,935.95 Base HRZ 11,332.45 7,340.95 Alpine D 4,946.33 4,046.95 Basal K-3 8.951.98 6,193.95 Albian 96 5,217.65 4,193.95 Basal K-2 Plan Annotations Measured Vertical Local Coordinates Depth Depth +N/-S +El-W (ft) (ft) (ft) (ft) Comment 2,645.00 2,484.60 -723.07 109.96 KOP:Start DLS 1.50 TFO 150.00 2,695.00 2,528.55 -746.75 112.64 Start DLS 2.00 TFO 80.00 2,895.00 2,704.18 -842.30 115.87 Start DLS 2.25 TFO 14.10 4,157.00 3,618.01 -1,687.40 10.77 Start DLS 0.03 TFO 51.92 8,955.68 6,195.91 -5,663.40 -745.31 Start DLS 2.50 TFO-100.00 10,067.45 6,800.94 -6.579.75 -666.44 Start 277.32 hold at 10067.45 MD 10,344.77 6,949.94 -6,797.42 -580.85 Start DLS 2.07 TFO-31.53 10,766.97 7,152.83 -7,135.03 -429.99 Start 145.96 hold at 10766.97 MD 10,912.92 7,214.36 -7,253.45 -370.89 Start DLS 3.50 TFO 0.17 11,482.89 7,360.94 -7,743.78 -126.58 Start 30.00 hold at 11482.89 MD 11,512.89 7,363.55 -7,770.54 -113.27 Start DLS 3.99 TFO-0.02 11,629.82 7,369.00 -7,875.09 -61.26 Start DLS 0.00 TFO-59.78 18,980.44 7,410.95 -14,456.19 3,212.73 TD at 18980.44 4/19/2011 2:44.03PM Page 9 1 Ni. AL COMPASS 2003.16 Build 69 Z w oL I- m IX - CD WI. J o J '' L Q ti I a N CO ao 0) N C ' O U ■ CO C I ` Q V •� _ O T cn w m O_ U N L c a rn a • O m - = o °, o osusw O N O X CO O AS .0• ° ‘— E 0O Z U o 1) 'a + /� Z Q M :; o U) 2 o O E N 03N M C 03 13) t 0 r • L s !R 0 0• U o r N 3 \v • 0n L ru U) MEN = O O U0. a) ^ o 0 3 i�f� ■_ 15 �E cc j o s Q L o � � � � • o �/� C C J ■.�MOM O V♦ 0 N a fa z • a i CI y arch a y Q ■ S 6 ca?) V tY V/ E c oa ' co • 0 Q, w COOm .0 Cii O x Z N L/ ��'' i O J_ O r �_ 2 co .O co a- -a IL a 0 Q a o m N O ? Q J c) Z c 3 t� o L �_ � � � ° ••-•ommo i� r 8 0 0 O CO /vim coL O • 8I y U t0 N ,_ J to ® C W 0 W L � N Z N D .. N .y N M CJ N i •6 O 0 03 ■_ a c s ci v O C cu Z N U N CL Q� c - al.� co N •CD a•i 0 co � 4 c TrCD CD 0 (IS CI to = c Q U 2V Eaa 0 S0U0. U Cr) moo e- F-`- a 3 0 cn cnn 0 > in cn a ORIGINAL CA ¢, n o a 0 SSU U MX O 7 Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y `Z C _N N _N N N CO N N N N N _N N CO CO N N co _N N U) CO CO N r-" 0 a' a' a' a' a' a' ix a' a' a' a' a' a' a' a' a' E E a' a' a' a' a' a' � )ti .� 0 0 0 0 0 O 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 O O O ~ .4... 2 (0 f6 (6 f6 f6 .� (6 N (4 CO N N N (6 .@ N f6 (6 (6 CO N f0 CO 4) U) CO N CO CO CO N CO N CO N Cl) N N N CO CO co CO CO CO N N CO CO `/ N N CO CO CO CO N CO CO N N N Cl) N CO CO CO CO CO N N N CO N V) f6 CO m m CO CO CO m CO (0 CO m m m m CO CO CO m m CO CO CO CO p„ aaaaa a aaaaa aaaaa aaan. a a a a c o 0. m `O d `O a) `O IllI 0 `O `O d o `O o `O a) `0 0 0 0 0 0 `O 88 0 N E U O U 0t V 0 0 0 U U t U 0 U 00000m C mcm m m m C m m m m C m mmfOmm mmm LL LL .�, U. LL LL LL LL LL LL LL m LL LL LLL LL LLL LL LL LL a) a) a) a) a) a) N a) a) a) a) N a) Na) a) a) a) ma) m 000p0 0 0 0 0 0 0 0 0 5 0 00000 000 c c c c c c c c c c c c c ccc cc c ma) mOm m m m a) co m m m a) m mmmmm mmm E mmm m m m 8 m as m m . m m mmmm mmm N N N a, N N a) N O N N UUUU0 UUUUU UUUUU UUUUU UUU O (O N 8 N M CO N (O CO U) U) L- 0 0) M M CO CO CO O 0) 0) N C O O O111 O O) CO M d' V O N L- (1) (O O O O) 0 , O O c0 O O C M M M co C C C N M N O O e- O CO h r O m .0.. N) N c N O) (n4 C M M N (O M M N N N N N O O O M L. 0 M V- r- M M M M M C C Sr N CO cis. 0 LL 0 O o 0 0 0 O O O O O O O O O O O 8 0 0 0 0 0 0 0 y 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 . s 0 o O O o6 o N) (O (n 0 0 0 0 (n (O (O o 06 0 0o 0 0 0 O O h N- OD (n (O OLCD ,- N N N N N N L() O (f) O A Q + O M sr M C t` CO r M 'Cr f` CO M M M N C 'Cr CO 0 0 M (n (n Ui O N N N N N N M M M M M M M M N V C Ne- O (O O O O n O C h M O O r) M QM M M O M ' O hO) d t 0 n r- N .- N N C N O) N r O) C N (O to (O (n (C) o L/) C N M - O 0 O O C) CO 0 O 0 0 0 co (0 N- n N- (0 Q A E N M (n CO CO v C O O v v to co co co (O 6) OO) o W N CO Lo r U) .- Oa) �0 C C M C � O O _� W _ M (1) t0 C N) o LO (n 23 N M N C N F..' _ _ _ O O) O O (O M 0 C M 00 O (O r O) Lo N N Na; O O 3 = C 'Sr N C N Sr (.00 (n N O Sr C to (f) to (n (n (n (n O (O N 7 Q�'-' (O N M N M M CO O CO (h M O to (n (O M M O a) CO O U)M CO eL N m O N In (f) (n (O N N cu N 0 O N N O) O N N N N N N (Si N N O_ Oco O O O O ON Ti; QN MN (M (O (n (n On OO N) 20 O) 03 O (n Lr!? (r!) O m E d („) r N O) N O) C Lo O) O) C O) C C U) N cO O O O (n C (n N 3 Q = CO N N N N N r h O Cr) M M O) O) CO CO CO CO N N N s- O fn E YE. N N N N N C CO CO O (n (n r r (() Ln CO O O co. (O O 0 0 s- y 0, y 'C N s- N N N e- Co aces 0. O CO w N wNy X a M tM n M IIII ao _ d) _ Cl r C Cr) (n LO (n N N M N C M (n N N 0 (f) LO co N N- O (O to c) to M O as t _ O) O O M C C ('0 (O (O r O) N N N N W O O t U 3 Q C Sr N C N Lo U) O N O C C Lo Lo O (n Lo to (f) (O N (O Q1'' N d -. (O N M N M O (fl O (? M M O C «) (0 OO M (0 (0 (0 O (O Vz • N !) (n (n 0 N N N N N O) O) N N N N N N N N N 1 +mCD" E CO ❑ 0 7 O mU .c N N E a)C � Og Na 0� o V o3o NE dz0w' 0 U m i m co ? c02 oU d0 Zdo da CO CO o 00 m (0 OO m C i a OS o d a s NN co M coov v 0 Sr M M a v (n 0M N O C O z` 5 00 O OMMM ❑ MV 4 ONNV ❑ No U N N N N N N N M CCCU (0 Sr C C 4 ❑ ❑ 4 4 ❑ C O CIE CI) E a6 Z c mE0 00U U ❑ C) ❑ C) o C) C3 ❑ C3 C3 C3 C3 ❑ U U ❑ ❑ U ❑ 40 „ co 0 0 a 0 0 ,- 0 0 U U U U 0 U , , U U , m U 3 = o 0 aOv VO Z UUUm b a0 ao ao eo O) 0 0as as X000 0 am M M vvO E. 0 N coO c0 O O .N L O C ? ' Ny 0. N N N N NNNNNNNNNNNNNNMMMMMMMMO a CV � V V C' ❑ ❑ ❑ ❑ ❑ ❑ (6 ❑ ❑ ❑ ❑ ❑ ❑ ❑ 00000 000 • 0UUUU UUaUU 000C.) 0 000C..) 0 UUUO c 00UU ZJ FA 04 17) ea J n 412 C ' el II ' CO CO CO CO O) 0 0 c- c- M M Sr 'Cr LO N CO CO CO O) O) 0 0 V C Z CO �Z (n N N N N N 0 0 0 0 0 0 0 0 0 5. Q 9 7 7 7 7 7 N N N N N N N N N N N N N N M M M M M M M M e... o Ca 00000 00000 00000 00000 0 0000 000 N O U 00000 00000 00000 00000 00000 0 0 0Ca > Cm mw F CeORtOINAL . . . _ . . . . . . c0 co / o \ c \ %/ o 1-1 « « %/ ƒ(m . ix ix ® \ tt / CIS 2 / . VI 0_ � ) -o CV E ) \ § _ § u_ u_ u_ § �� 0 o CI)0 0 0 0 E § § § o E ) ) ) ® 000 CO 0 0 0 0 0)Y Y CO CO mi ¥ $ § CO t ) i ¢ i� ko 20 ■ ■ / $ 63 ± O 0222 2 ° SS Bks j \ f ;A anw a _ ■ > / Ik- 0101 § Vim£ / -w = « m \ � f@ e _ § & � � j \ § E / $ 20 t % a k \ as $ a 8 E § S a a a a ° ( a2E - - A ) O. [ ib � � � . k 00 C « . o ao 2 ee k ± « CO 2 . § I2 � � � _ $ < CD C3• to 00 \ ( � 2 ] @ � �o � ._ �A- - - & $ � @ . acc § \ \ § c c• 3 \ o \ a) co o o tom , G8m $ E \ 8 ® t � �■ awK6 » % K ® fak k �£> $7\ § • > a Ci 7 ] 2 2 0 \ R m ; ) E » 3 t \ k } im 0 + ; • CO f ` 0 % m = C 0• . � 7 CO 8 2 8 2 j � ) � � � ; 2 § ] / \ § _k § @d 0 � ) f ` ) $ a4 % 2 04 ff \f ; { 2 = $ 0. £ �a0 f R / § ~ '0 u 03) % { § co- . . k o ] « ce E et 2co el . E 0 � \ a,0 11) aoo �_ 20 ; ■ $ ! c 09 / \_ c imi �k %moo § as Cl) co Cu ) L. , • k , ; o o § k k } k ) ) \ �o C § i ® e0 itE 3 3 o f f ) § / mai - , cam za go e = mo u & 2 rc a § 0 0 ) ° ) k ° 8 •& c > a ; § 0 0 o a / $ % § @ 2 J 2 $ w G \ b o \ ! | }| \< ! \ 1 'NJ t \ . % E 2aN �0 i 0 0 8 N -CrO N a0 r•ic V 4 a a,,, UO O ; ,i, a c1 cOrn Nm coNmmrmmm k `ab4111,> n ' NNamNi p / J iHEiH 09,om `11Froll4 'e R S'000.M00,00000 010t70NOYvv� 10: p W ' M M CD N NnYfOOnOlV8'4.210 .n< - p N OrPOOED tO�N p ?Necmm0mm.2iagn'.�i ' { rnto,:iltwnn nn� V °S2°,2;mOOmNN(tpppN mm�O WOOm OOIN 00 F.+ Om OmONiONN�t00 f�D tOO� L NNNm^mOl�N.7t7ti x mmmrrrrrnV . 0)OONA.nRONNNN Pgj. gANegNNNNNN �' p1., ON WO�OO.ONOOnm M_m 18;S00000mm Meimior.: NINYfN0101NNN... WW0Wmmm O S p000$cONTO1NQ vNa}N.nn.nfrfp.:46WO . aIrLNOAn�ONtNDW tuGNVm00001-mN—NC')e0)0n50) ' 8Wm >' SS O N F N Mil I 3 > ma o nRm i 1" ° U o I- CY 0, o ss3 .mag $ag- < � F, 6 B $ $$ g Z 2$$ [$ $$ '-$$ $$$ $$ $ C $ $ ., -sg ,g S • � 2 � W $$ $ F$ $$ $ gga$$ $888g6g$ 66$ a$ $so y o o f 0 0 0 0 0 0 ¢ 0 0 0 0 0 0 0 0 0 0 0. $ 0 686 $ 6666 $ 6$ $6$ 666666666666666516 4222 N C o t �_ 3 - Z to w 3 O ggggSg O paN N O g 0 m M v, n w not --- AM, v) o a. Io I� • § 8388 V M•`•/-�44tu /Oki H s s s $ E!�' i�N 0co o _ _ _ /�/-� r° CJ ' NEIN o ii/%11�ll. Q pieginivo 1/6 04001111MM% 4 it -= 4/01101111110011.Pr ,, e- co hill li.1 02 /4/11111111111111114 — 'a-) pp 0 F FFA d M w.. N m N F QRSts (OD N i. N Qi N 0 •0 88;i nn o F CI) E 8. 88 flR1G\NALN $"^. s HALLIBURTON ConocoPhillips CD4-208Awp1 0 Alaska Sperry Drilling ANTI-COLLISION SETTINGS 13:34,April 06 2011 Interpolation Method: MD, interval:25.00 Depth Range From: 2645.00 To 18980.44 Results Limited By: Centre Distance:2094.43 GLOBAL FILTER APPLIED:All wellpaths within 200'+ 100/1000 of reference SURVEY PROGRAM Depth From Depth To Survey/Plan Tool 80.00 438.00 CD4-208PB1 Gyro(CD4-208PB1) CB-GYRO-SS 476.13 2645.00 CD4-208PB1 IIFR(CD4-208PB1) MWD+IFR-AK-CAZ-SC 2645.00 11482.89 CD4-208Awp10(Plan: CD4-208A) MWD+IFR-AK-CAZ-SC 11482.89 18980.44 CD4-208Awp10(Plan: CD4-208A) MWD+IFR-AK-CAZ-SC CASING DETAILS TVD MD Name Size 2440.21 2594.33 9 5/8"x 12 1/4" 9-5/8 7360.95 11482.89 7"x 8-3/4" 7 7410.95 18980.44 4-1/2"x 6-1/8" 4-1/2 0 0 U 0 60 .15-: a a) - a) - C N - U a 30 II a) a) U - 0 j?i 4000 6000 8000 10000 12000 14000 Measured Depth LEGEND �- CD4-05,CD4-05,CD4-05 V0 -e- CD4-211,CD4-211,CD4-211 V2 CD4304,CD4-304PB1,CD4-304PB1 V16 - CD4-07,CD4-07,CD4-07 V1 $ CD4-213,CD4-213,CD4-213 V4 - CD4-306,CD4-306,CD4-306 V1 -e- CD4-12,CD4-12,CD4-12 VO CD4-213,CD4-213,CD4-213wp06 VO CD4-318,CD4-318,CD4-318 V6 $- CD4-12,CD4-12PB1,CD4-12PB1 VO -8- CD4-214,CD4-214,CD4-214 V3 -4- C04-318,CD4-318A,CD4-318A V5 -$- CD4-12,Nanuq 5,Nanuq 5 V1 -9- CD4-215,CD4-215,CD4-215 V4 -X- C04-318,CD4-318PB1,CD4-318PB1 V3 CD4-16,CD4-16,CD4-16 V2 -A- CD4-298,CD4-298,CD4-298 VO -9- CD4-319,CD4-319,CD4-319 V5 -4- CD4-17,CD4-17,CD4-17 V13 CD4-298,CD4-298PB1,CD4-298PB1 VO CD4-320,CD4-320,CD4-320 V7 --- CD4-208,C34-208,CD4-208 V7 $- CD4-301,CD4-301,CD4-301 VO -B- CD4-320,CD4-320PB1,CD4-320PB1 V4 CD4-208,CD4-208PB1,CD4-208PB1 V6 - CD4-301,CD4301A,CD4-301A VO -e- Plan:CD4-303,Plan:CD4-303,CD4-303wp06 V7 -8- CD4-209,CD4-209,CD4-209 V4 -h- CD4-301,CD4-3018,CD4301B VO -180- Plan:CD4-303,Plan:CD4-303PB1,CD4-303PB1wp06 V8 CD4-210,CD4-210,CD4-210 V3 CD4-302,CD4-302,CD4-302 V3 -9- CD4-08wp10 --X- CD4-210,Plan:CD4-10,CD4-10wp08 VO -A- C04-304,CD4-304,CD4-304 V6 C' � CINL Northing (4000 ft/in) iI II [ 11 I „ � � I � � � � I � � � � I � � � � I � � � � I � � � iI � � � , Iii � , I , � � � I � � � � I � � I � � i � I , � „ I - o - N _ 0 - O M N _ M N _ m 0 Q - M U U - - v - o U 91M _ V _ o _ Uo - Q - ao Lo N — O O N 7 0 O. - U 300 C? - CO d CO - d N C U O. ch COM v - — O o Tr .,- O — M m 0 Ti- 0 +' O N C - .,,.. Nom' ``�` - C O _ U U_ III�,� ..1.0 ` _ O 4i,,i- 4 W _ • '` _ W U m - - d 0:3)0 56 — co Tr - U o U - U j _ C O'C - L 0 C Cr aZ o - a L Z — - o 'zr— G o � — 0 - o U - -I I 1 1 1 1 1 1 1 1 , , 1 III 1 1 i i i i 1 i i i i 1 i i i , I I I , I 1 , I I , I I I 1 1 1 I i f I l I l I l 1 , , , 1 , I I I 1 1 I 1 1 1 omul /\1.171 gg F.,1 N N Vth I: LI' \ •c•-•888 r `�s. 21-Ag I Z N N N v o ��ea Q O U N.-_ I. a ESS iii +`9n L c9 888 0 N c N 0'88 o O w ��onn 6.$ . C4 1 0A IA of C. .. o c Z 1`4 la iia LO V iiyy o^b of CD 0911:„ Lo igAg hi / r N 0 0 0 00-. N• 111VCU W . ir • � I O ci 17,.k -110.,#0.' et p O 0 CDe CO07- :, ,� O 0 N cp L Ln 4t CD1 V c� o o , a , ti St liffi of O o _ O M .,S 0 N V 1 O 1 _ .6 O O O O O O 00 Oin O OLo O O LO v Ln O N LO r•-• v (U04 00gZ)_'(' upof /(-)u$noS 2 a 8 ri < < 3 = "a 001.1g91. C i 007S1 $ gig • _ _ _ 58 < _ wtdZsl - -0077 t wuzst wtozst 6 3 C.',' -0017E1 i i COL 61.9t a 0018191 + 03t/at ::: ifi ,,. . . . . = 00711 Wlslsl` C 8O — $ o N g R IO 5 _o �E t 00701. m d C-)wnos/(+)4voN 6 4 p U U `o m .n 4. c, N 5 s 0076 a N 6 t 11 > s Q > N L• u C U I 3e0 > O 1 : .' 4 -- -- 0078 O co co O N▪ G i — - OO7L .4 i ' E 8 ° ,: a.... 3 um r ET. O I --- 0079 0 = ✓ ti r Q r 0O J N 3 0379 xr o 00 > OU U c 0 U e E N OOV7 5 . FEF ¢� !! b Ulda4 1001410A en 1 wa{sAS s 12a i U ! \ , 7a ! ( \ E ( - #! ° 0 E) ; f7 ~ ° )xl22A ƒ cn q } \ to : / \ } o < zw N 2 ; ] [ S ( ) $ / ) cocri/ \ co\ 28 - Oam PJ ) : . 4 \ — ( § 2; \ § ! E ƒ C e5t & © .\ 2 / & VAI § 2 \ \ \ E % $ § f ) / / \ 00 < Z0 7 ) Lri k R®u H \ .. ) CO § ) CD 2 § ) o J m 8 co 0 a. $ \ Z § N u 2k E ) ƒ ORGtNAL CD4-208Awp10 Surface Location CPAI Coordinate Converter .. ( 1 ❑ From: -To: _ _ �___..__.._ ._ Datum: INADc-: Region: Datum: Region: g lalaska INAD27 lalaska C Latitude/Longitude Decimal Degrees J C LatitudelLongitude 'Decimal Degrees C UTM Zone: 1--- r South C UTM Zone: 'True r South .4 State Plane Zone: 14 1 Units: lus-ft 211 C State Plane Zone: ,True + Units: lus-ft j C" Lecral Description Irli,.i_., iii,;;i is Legal Description(NAD27 only) Starting Coordinates: _. Legal Description 11514071.$0 Township: doll IN I Range: 004 IE J Y: 15957240.13 Meridian: IU .J Section:124 IFEL zi RE—IL 2917.9024 205.97325 Transform Quit I Help r CD4-208Awp10 Intermediate Casing 51 CPAI Coordinate ConverterI J4al From: - -To: Datum: 1N, D83 +` Region: lalaska .J Datum: !RAD 27 + Region: lalaska J C Latitude/Longitude Decirnal Degrees C Latitude/Longitude 'Decimal Degrees (- IJTM Zone: r South r UTM Zone: True r South t: State Plane Zone: 14 J, Units: 'us-ft J (-- State Plane Zone: 'True +' Units: 'us ft e- Legal Description INA.D27 only) r Legal Description(NAD 27 only) Starting Coordinates: Legal Description --- - - ---- X: l 517820.00 Township: ,011 N + Range: 004 E + Y. 5949500.00 36 J Meridian:diaMeridian: I!U + Section: p7- +; 1018 ' 332.71947 IFELJ I _ Transform Quit I Help I ORIGINAL CD4-208Awp10 TD n (PAI Coordinate Converter `' From: To: _ __ Datum: 'NAD83 H Region: lalaska 2,1 Datum: INAD27 ,I Region: 'alaska Latitude/Longitude (Decimal degrees r Latitude/Longitude 'Decimal Degrees ,' f' UTM Zone: I r South C_ UTM Zone: 'True r South (i. State Plane Zone: 4 Units: us-ft C` Stake Plare Zane: True Units: us fk r L ctal Dr.scriptic,n INAL,...,,, :�,,! a Legal Description IN6,D27 only) Starting Coordinates: Legal Description %X: 11521050.00 Township: 1010 IN Range: 1005 E Y: .15942735.00 Meridian: IU z! Section:16 IFNL H 11535.0209 'FEL it.. 12015.8592 Transform Quit ' Help ..), R1GINAL at, t O P N C z = c o w LL LL 8 O u 0 0 0 (00 d 4 4 4 g 8 8 8 rc H110 {{pp U U U a �OINON btNtppN�llnJ pp�pp11�N0 O U 10A0'010N1�0810 n o G 8888:2 ISSNS�88 �� U 1y000Q�SO,OCIOQN ` O F �m N ` -1 OI00 N170pp SNS°'S A `� rho •�IQ j0. SN01n00Ot � ., 0 W O�NNCINON01701�1C ,��../ V O tOYAAOf OW ' tai i� Z 3mlo aonyry loO�gmv p�p �`'_,�, j 17!p��OnuOpNNA N�ION O ,•��1 - 0p U + `Y Y cA "� w , 7. lig yonnaan4oelaa l"ogm O 3C)1GpNpEtE�pp1p 0„.:V)C)ff 002 O +An;!T,NA7Am3a �N14 tq I�f�rn�V 01y8yg2 pmpo N8u�888oa`d'i88g H ONO�OIG88',8 t1�0100� A4W* 883;z f(h010 t NNN 10101OAAAAAA c718 NNO!W1 ,B2A .AOp In NNV1O1yyNb Nut nA80 g,8.82 0NhYlN Q 010010g8281000Aa0 O O ggi81lcrrvivivivi of of NN 10N10N10 0Oa00a0 0 b OO G Ca 0000 u)AANAON< N -'(ppgr,1;11p00�Ag 0 01 1 U NNNOOa0p808”:28 C, O�Nm,00At0010,:n O U N NO _ R o O F' 9 Na O T 8 8 2 8 2 3 8 ' O ^ N V b ' i ' 0 m U �' w 3 " 14 :�ng $Eog _ m < "g$ = $ 8 `JS $ y8 = R $ LI aa)) 8888881 0 %$ m $$ Sg$ $ _ g$S $ $$ gugEm $.� $ du n o m u o 0 0 0 o u m u v v v v v w v o a ^ g 0 8 7:7: - :? 8 S <a , ,,,'F,1,11 Fig 8888 `g$88888 $68iig $ 8vg. 0 0 0 0 2 0 0 U O v OS 0000000 0000 0 0 0 0 V . .. . . v o o v o 0 o v o 0 0 0 0 0 0 o ut,uuouSEu 8 88 , g V 8 +03111++04*.11 0:1303+111 +00+114+#0*C13 0 N b C 8 LE f N W O O a 88881 T o 0 O 01 - C 5 g Co O 3 8 1 1 1 5 m Q a o m a M - m d c 0 PIM 0 w 8 J 0 a .11cc, 0 0 _ _es J A y Mr, 0- eiEEE 0 H r C 0 -o � c O F d FSE 3 $3 O N m A co f0 N N Q O .: 4i* e U 16 PM to N L 111, RIGINAL ,.............___ 't • a t N o 3 NF N Z 2 , m 8 C^. E nmOm�lOmroLL F LLO O a VTN oO yO� O m= OU U U A2.2. 2.".113.8. s— •f4 llik oav >mN §eNNO�NO O 11001111\ O \ ( ®� .N C �ovoim �n$o 000q�om \OMMOIN111 I J m000Nt)OOn00p m0 Q m6.- doi000NOm0 '��I�.1, JO�IV fV ONIO fV 0t70tl0 i�II.• p 3mVnnmN....-OOmmN '� ��' Z mfcmn nmo� aov« I�IJ� p �7y'oiciviov.cioaoui Nita !tel o m o N 081e84an38428:21 - _ 'itGNln t7 Oi n•NCfnCNN O —79.V.5 rr-rr i.rr o p8Nm.-NOO241,88 9 N O m 0 O m V m N m gNO�AOgNZI,V5°5 VNn m7,mm,7 N P.l+f thO V. , .0 NNN�y tDmmnn nn nny +� ���OONNN<O�INf)NN CC nl�m T m.2222882 4 U O N m O;0 0 N N O O n m O O cm.-000NN0000(om m N u NNNNNNNImpm O8m8 - — 'J p 0 0 0 0 N n n N m m N O . N .F. 2o0000 iDYf`WmmmmO T pNpNNn28420Ni Ni82 - U '44P,7,28888'"'" 4P,7,2OMrOON'" bA N N N O m 0 0 0 0 --m C U Nm VNmnmm0'NV. O 0 O U N f7 N 0 O N H N O O §, $ $e '0 § � m � m ym > R U 8 8 8 8 5 0 > m a m a m A Um I Z > '' $ N3 ^ F, $, 6 Mry < mF,$ ' r8 $ fa = R$ Wg = $uas AAa at $ssus $ $U $§ 888 " r- Wu3-Ug `$- $e ;o�vi_ d�58muugtw;ha J $ $ x$ $$ $ $ $ 5$ $ $6" 6 $ $ $ ii$ $ $ -" 5555 0 0 ouso ouo 8uu u 0 u 0g Es 2 8 § 888 ++++++01:440114.4+4(.1'0(0+1404+04) 8 8 8 8 5 0 o N •C U L C N O O O O OMil O II9 —. Ov c 3 m co 11111 0_ Q N N W ! SII I•►" U ir- o U w -.N� - p 18811 _ U co m o - N J M > O 5�$ ' 1 $ ^5q3� / Q O LL H ygg M 1,9 E O 4 - N O �^ lill° e§ Q0. V s1 s�§ I I U co F a fir ,a�= o o Oi Fgge 3 N N > O ; O O o88m 4;x� HGU\1AL' t 0 F N 2 =. C '^�t O - LL 2 O11‘ N O o o O m mmOd 9 9F °v S gmmmmOrMMmrmMO NOmC08mONm7mmmm U]NOf� BN,n V1�0«� O70tN ON m Nm Nm 08 m0mrm�CNinfNOC000(0,-, O G NN I 8 8 8 8 E 8 8 8 N 8 C 8 0 A d uTONm47OCmOOC9NAl I I I 2. JF 7 000m800r00p830 QQOONONo(7Ct7o Z mmmoo8ae� , M O O u U LO L,8 mrroormeormome 0 +NemrmMmrm ‘111,m, mrg.r-Nrm4 OaD, O QOmgm^mOOmN mmOM gNgOAb �08m� Q m mE CEL-'1K1 Q ‘1118 t V�e mOmNmmmmmQ g ci r08mH�NNNO 0Omm0OOOOmO0rmm mc.,.:p r,...:006 wi 06 NNNmmmmmmmmmm G 2OOOomrrmmNe T rntm1m�m4,6< H 06C V mmVmmQmmmmbo NNem0000��^m 5 70NMemmr0m0 ' N'T E O N E 8 8 8 8 8 22 N e m w 3 g g> g 0 a > > "mm a .,888a�' 88 0 o o > mQan3m > cm 3 > yy > mzmo .a c w ' ' ' $ e3 ' 08m $r _ F. E8RoSg18 N8a < $ 6a < 8 F $ $ 2 888 8m8 $ $ ama $ a moo aa8o 88 Qu -� v u$ D o muu i 0 So " s§ $s6 �`" s�$§ Eggl § 02 $ S $ $ issaagaaaaaaa8 iaiiiaiti ` 81o00oso00ouo00 000 0 ouooo a1 AR8a888888888888888Raaii giiRR u 0 u0 0 u o u louu o o 0 o u uo0o a 0u 0 u o u ouo or. eo 0 8m 8 ,811 +++“+*+�JJ*,I4144�lj0J (jIJ b+ (I J 7 ' 8m888,- F'D' NC U E N W O O R 888 $ 8 E O O O. Mil,n m e p O O 1 h., $ 88 is G Mil 0- 0 o O O 0 `1 a 1 " c 0 a 8 8 8 8 8 U WM M M n M O _1 4 n 8 5 8 8 8 d E N N N N m 2 C J y a--. CD O ' 1811 O LL F L �e M O O ## CO N 0 $ l ed '? S v J H 6U$$ a`F O 0 CC 0 CD, F d FB 1 SPC §' N N N v 0 Rio O ' 0 °8803 4si` ORG1NAL W F 'o m Z I I- .A. LU E a m Oo 0 LL 0 liki u 0 0 m F°� oOmaz a a0 H 0 0 0 aq2oumiglzim(m econ.-�+i�Jvicr:vv�>01NON b NHNN OMN01pnm�av`Di�im`2�°�n4 0 o888.EV MonoN& /� N oo.-mo$ulo�oon � U a000O009oi '\ p cONO M J d Q NO O O M M O O n O 0 0 N 0 },i O N O N O N O O O N O 010 W OC�NNONONOlhC17G V m=tEL2F� omcnul mwnnroo �mvv� • � ;N N C O N O A O N N G V O H *o�- nTNv�n,1� mN O O W 1� M CO In N 0 O r 8 V V r 4 2 4 2,OD'A — W NQCGnDMr T�1ei00N O McVi 71OjNT9 } ❑O2E;288 4C88g go6g06NciN.i0oiNci Cn;E0MM74 L QQy�Vo0VNNKWNNNV C nr'Sig;N11HNNN 28;g2W881-61 II07 NNNfNb�DpD O 4 O SOOONnamNV pj T NMMppEW.76GwG NMOn0' O m g yl O On N F Q N O O § w S d � sss w "g $ g -$$ s as ggs sa e � se t0 ss nmm o umuuoouodum8 W 00. E ?2. . 4 0$ ,M < - .aro - 2$ - - s s . . . . U V _ .U 6 U 0 0.0 0. 0 0 .0000 0 .0000 "I uosst., 1 $ 111 0 0 N t C_ 3 s y w O o a $ 1$ 1$ rn o ti 3 III N Q " " g I N a. O w w w a \0 N aQ 8 8 8 8 8 \ Uw M o1 n A Mo 8 8 8 m y/ c 1 Q - r/%/ o a mo r�///L_1i c N I o Amp, /1/4� 00 0, o In 1114 leakit 5. 0 8LL"' m r�%/II//a ,, ,1 , ci voi 1212g i - 44"114M010 O F 5.--8 �aa1! c o O $ pm c0 N N > R 3 0 E 0 °8808 4$ . F- 0 g t I FLLmmOOmncZOmqo o�M'm2o L SOorotmehi mq U U momammoNmmnmhGo. O O UG=OFa=u . :>, Ng,R6, mvev70 O l' mm'AmmNm2Se o 8SS8n,!, m m - C) WQm r0000 O O tV m.AA ;.�-oorn /Ilk O .66.„...YNCa U M eW mAmOOrmemrHOme n) o�pnp e7 me{prcoeao totem zg/V41DtO(ONAgNnnmV ig G �tgtq<grrrrne 8 O p O m m m O O m N m m O M v mNg:L6gOhN..iSmS� emrm^mcz=fhe t N N N m m m A A n A n A 'q^BSL NNmmmmme Q m ppmmmsf a Yfm mm h'4gg thNNNHNNN G cO m m O;0 0 m m O O r m O O 4 mr:o oomm0000mm N mmoir�ccr�IPPAggg 3 N N N m m m m m m m m m m 2 0 0 0 m m n A N m m N e co N O �000Smermmmmme NIMH AY)f�QfO H CI Cl OtO U t$tmom�mtpO rinmoin iom . N N N e m 0 0 0 0 ; m C 9�N th e N m n m m O',-.- 0 N R 0 O N 'r' N O T § 1118 s 85 _ co u> > a m a 1 1 0 .. ° > ' >m um 5E3 > > 433 > >< m ^ 7,> 5 o W I C $ gssg 0 $ $$ uooNom u du u " N s § 88$88888 86 ssi 88 §§ 12 . u u O g � g � � 666 THERRARligggigigniiggg u u u o uoo u u u o 0 o s s u o 822 $ 8 N M 1 C C t▪ w 3 M R O a $ gig $ m O o 8iii8 1 OW 1 a J a i0 d IX▪ SS 78 8, 8 U w ° LL Igs1 $ C J N o M 0 O O LL F L ‘1111111#” E 7 �:•e •c a CO Eir =ria O 0 c[R-'A-[yds g g 93 O el O O C 0 add 1.- N • > O 0 `g a R [ �tR` m y9: 4$ � f . ~0RR0 OVERSIZED DOCUMENT INSERT This file contains one or more oversized documents. These materials may be found in the original hard file or check the parent folder to view it in digital format. TRANSMITTAL LETTER, CHECKLIST ' / WELL NAME ( 7 ' z4ie A PTD# // 60 Development Service Exploratory Stratigraphic Test Non-Conventional Well FIELD: /t fr//7� ,&,&01-6.4POOL: 9r -� D! ( Circle Appropriate Letter/Paragraphs to be Included in Transmittal Letter CHECK ADD-ONS WHAT (OPTIONS) TEXT FOR APPROVAL LETTER APPLIES MULTI LATERAL The permit is for a new wellbore segment of existing well (If last two digits in Permit No. ,API No. 50- - - API number are between 60-69) Production should continue to be reported as a function of the original API number stated above. PILOT HOLE In accordance with 20 AAC 25.005(f), all records, data and logs acquired for the pilot hole must be clearly differentiated in both well name ( PH) and API number (50- - - ) from records, data and logs acquired for well SPACING The permit is approved subject to full compliance with 20 AAC EXCEPTION 25.055. Approval to perforate and produce / inject is contingent upon issuance of a conservation order approving a spacing exception. assumes the liability of any protest to the spacing exception that may occur. DRY DITCH All dry ditch sample sets submitted to the Commission must be in SAMPLE no greater than 30' sample intervals from below the permafrost or from where samples are first caught and 10' sample intervals through target zones. Non-Conventional Please note the following special condition of this permit: Well production or production testing of coal bed methane is not allowed for (name of well) until after (Company Name) has designed and implemented a water well testing program to provide baseline data on water quality and quantity. (Company Name) must contact the Commission to obtain advance approval of such water well testing program. Rev: 1/11/2008 � m Dv Cn D CD O g D I 71 'o 0 CO m 13 3 0 0 D v (n o 'a o co C v covi 3 Gco 3 o A A 3 A .l. O N w.(fl v 4 V 0 01 V O O O N Cf . O 7 n N N moi it O O CD O CD 0 CD 0 0) W 0) co CO CO CO 0) W W N N N N) N) N N N) N) N) -1 •-•LCO 00 -1 CA 01 A CO N) -1 - ° CO CO -) 0) 01 A W N) -1 0 CO Cb V 0) CP A W N) -1 0 CD 00 0) 01 A CO N) - 0 74 (1) 0cnco0m F gnooWD » > Q) mc� > 00000 D * -o v =. 00 , w * * * c1— -az , 0 0 CD CD m CD CD 7 p p 7 a n o n n) c o - (U CD CD -0 b n v 7 m ( v 0 10 ° ° m m = co 0 y _ a, 7 m F m 7 CD CD CD m m m a N 3 o nQ 3 7- m s m •0 5 o a •0 < o c - 0 N 3. .-. U1 w N m m (0 CD C C (0 * < < C) C co O .. N N O 0 0 0 CD r. O z °" C) (D C) 7. CD "O w = N ID a CU n = O O CD C) d N n (D 0 0 0 0 CU C) C) C) 7 Z 7 C) a) w N C) n = O CD n C CD = CD (D O CU (U 0 o 0 * 9...) 3 CU CU a N CU „ N 'C N Cl) O ,,•dU.. N O 7 (D 7 N CD O 7. w O 0_ Cn 0 n n 00 CD r. 7 7 7- O .. 4) co co co _ 3 7 N 0" O w CD 7- 4) CD CD N (D n CS Cr N 7 y 0 n n n• 7 (T a) • O T. 0 0 N n CD 7 = C n fl'). 0 O C --000 . 022 7' (N CD :0 .° (0 =. O- � g N (D CD N N < Zap; '0 -2 7 N N °) N CD S 7 w O w n N) * C) 7 CO CD 0 N (0 CU 0) N N 'p CO N S ID N (Ni) 73 a CD (0 -0 N 3 w __ n O w O 7 C = O CO 3 ID °- CD -• 0 n x CD N l0 "O 0 A j -0 C C n Q N Ca) N n '0 (D 00 r R° 7 C 'O co O 5 3 N (D 3 n w O O CD 7 l0 CD (D O N N a o O. 7 - co w n 7 co O ('D O O iD o -1 O n n CD < = = O Z S CU c O O w O CD A C O C) <. :. - < n (D N 7 i1 D n o m v m w 0 ° m ° m v F w n m m F v' m v m o o O 7 .< 7 0 .0 0 N o 7- w CU W w CU Cj (D O. p1 fl1 n '0 z7-). N N O• C N • > 3 ^_ v 7 m o m F o c ° m -., Cl) ° 0 c _ O c cD 7 CCD 0 0 Cr (S-D C7) 0 .0 3 w0 CO C• D CD o (° 0 n w m v D 7. m m 3 0 (D a m o N o o m ° Or CO m < N o o al -Q o ° m 3 b o_ n c (O O o - n 0 .. c n o o 7(p "O S N -� N CD 7 (D S?o O 7 .. 7 O N N 7 7 CD - 3 3 CO• D C- 0 0 w m n < < m 01 w m N l0 7 (D 7 7- m .Cn-. CD (0 O O W (D 0 p C '0 N' N 0_. 7 co o [1 �' o a Z m (0 CD CD w w c f c w 7C�. mCO O CLD S = O 0 17 w co c O a. W o C N 0 3 QO O co(° 0. CNp m S •••< CD CD C CD = cl) - CO 3 d Zll ° -0 0 °' 7 N' N n < O0 < ED o_' .7,. * (0 CO m "44 Cii N (D < 7 CD 'c" K N 7 C O0 w O. 7 N ' N N C C .-0 CD Q 3 O D 0 m o CO N a m -. w a m 0' n a ci) m w Q > v w w w 0. A .0 7 0 (° c o D m c 7 c Cu w•. a 7 T 10 c C Z `� m X vo) o 0 c' 0 N o N m 0. N m ° 3 ° o (o CO w O m 54> 0 O w < s CD o `z 0 Ell co 3 CD 7• _ 7 C) , w co O N 0 o co o o = o < co 7 0 4t O 3 -0 o n LT 2 3 c fA 0" m O 0 0 0 7 w CD CD 7 2 0 n 0 C m B CD LI) - 7 O 0 0 7 — D '< 07 CU 1-II w co z z z -< -< z z -< -< -< -< -< z -< -< -< -< -< z z z z z z z -< -< -< -< -< -< -< -< -< -< -< -< z z m D D D Cl)D COD D 0 w Cl) can' CO CO D CO CO w CO CO D D D D D D D CO w w w Cl) Cl) Cl) w w w w CO D D .m 0 o m -z< m cQ m x z K K * m Co 73 O z cn CI) 0 -h 0 0 0 0 '0 0 m � 0 NJ _ COD X m o CO 2 �, a, = 3 0 0 3 OW Cn o m =- 0 w N C) C3 O O 0 < fD CD .n. CD co m 0 o 3 W o o m CD 0 ? Z z m w Z 0 n 7 CD A N n w a 3 N N O fD A A w m 7- .. CD 3 7c (D 0 01 7 7 0 - CO. w w (D W W o O O CD W o CD N 0 -0 P° 3 a > c co 0o x c cn D CD 7 co -I 2 C C (°n -o o CO•n D N' m °' CO CO m m 00 m m CU O (D O- 3 0 N 0- 7 CD co CCD n "0 w 7 0 D C) 0 CD 7 a A c co m o o co o 0 °0 ?• D o m O 71_2,- ° co co 5 -i m O o CD °c m 0 o. 7 3 co m a) o f D c ° v coii 3 0. - n• A (p m7 ° Z co m "O CD cn CO CO _. n Ca 7 N 7 ti, (7D CCD 'C CD m co 7 7J CD co• * ccnn "p0 pn oo m z 0 0 0 A 7 -o 7' Or a D c m N w o �' ° * m m 0 co C0) co in D Dr Z DO -o CU co ao N u) S N) 7 0o 0 co N o 0 1- co "'{ 07 ° n o D a C co 7 n n ,,,-s n '� W O 0 m o m n 0 •w w o N w O - O co 0 0 < <CD N w• op 7 CC) 0p CA ', 7 l0 CO v N < (0cji S .O•. W O O _*_ m Can *_ cD 0 CD 0 0 F 0 CD -°0 7 03 D (n O 7 D -00. N Q N 3 3Q S -13- (D _ CIL O 7 < CD A n 7 n 01 a. Q 0 0 m 0 W <Cr D 7 0 CD :. 0 1J Q N 0 D o rn Cl j N 0 N N .n-. V p W z co * C O p ,-,3 O c A CO CC) 7- 13 _L CU n O W O 7 'O o 7 F. "�O = co A O o Q. GJ Q S 0 7. O • 0 co O * -0 N Cl) CU 3 (0 3 C- N _ CO 0 CO o C7. m CO O 3 O O 3 N 0 CD N A 7 C CN U) Cr N N) p mi..3 13 n m CD C 0 0 D Ti 7n 7 m CD n O 7- < (0 0 CO (J)O N C o 0 7 w C 41 0 O 0 7 C 3 P- c CD Cl)• m 0 CD 77 7 CD 7 CO 0 N if o N_ > 7 m 7 C - v a 0 D m CO '0 o (0 O V) N [1 I 1 VVel! History File FE N ; 1X Information of detailed nature that is not particularly germane to the Well Permitting Process but is part of the history file. To improve the readability of the Well History file and to simplify finding information, information of this nature is accumulated at the end of the file under APPENDIX. No special effort has been made to chronologically organize this category of information. Sperry-Sun Drilling Services LIS Scan Utility $Revision: 3 $ LisLib $Revision: 4 $ Thu Jun 30 14:04:42 2011 Reel Header Service name LISTPE Date 11/06/30 Origin STS Reel Name UNKNOWN Continuation Number 01 Previous Reel Name UNKNOWN Comments STS LIS Writing Library. Scientific Technical Services Tape Header Service name LISTPE Date 11/06/30 Origin STS Tape Name UNKNOWN Continuation Number 01 Previous Tape Name UNKNOWN Comments STS LIS Writing Library. Scientific Technical Services Physical EOF Comment Record TAPE HEADER Colville River MWD/MAD LOGS WELL NAME: CD4-208A API NUMBER: 501032051701 OPERATOR: ConocoPhillips Alaska, Inc. LOGGING COMPANY: Sperry Drilling TAPE CREATION DATE: 30-JUN-11 JOB DATA MWD RUN 1 MWD RUN 4 MWD RUN 6 JOB NUMBER: -XX-0008065746 -XX-0008065746 -XX-0008065746 LOGGING ENGINEER: PAUL ORTH PAUL ORTH PAUL ORTH OPERATOR WITNESS: DAVE BURLEY DAVE BURLEY DAVE BURLEY SURFACE LOCATION SECTION: 24 TOWNSHIP: 11N (� RANGE: 4E lq FNL: 2919 FSL: FEL: 206 FWL: ELEVATION (FT FROM MSL 0) KELLY BUSHING: DERRICK FLOOR: 56.13 GROUND LEVEL: 19.80 WELL CASING RECORD OPEN HOLE CASING DRILLERS BIT SIZE (IN) SIZE (IN) DEPTH (FT) 1ST STRING 8.750 9. 625 2594 .0 2ND STRING 6.125 7.000 12252.0 3RD STRING PRODUCTION STRING REMARKS: 1. ALL DEPTHS ARE BIT DEPTHS UNLESS OTHERWISE NOTED. THESE DEPTHS ARE MEASURED DEPTH (MD) . 2. ALL VERTICAL DEPTHS ARE TRUE VERTICAL DEPTH (TVD) . ONLY INVERT/ REVERT SECTIONS GREATER THAN 30'TVD ARE PRESENTED. 3. THIS WELLBORE EXITS CD4-208 PB1 AT 5767'MD/4488'TVD, BY DRILLING OFF OF A CEMENT PLUG IN OPEN HOLE. 4 . MWD RUNS 1, 4 COMPRISED DIRECTIONAL, DUAL GAMMA RAY (DGR) UTILIZING GEIGER-MUELLER TUBE DETECTORS, ELECTROMAGNETIC WAVE RESISTIVITY PHASE-4 (EWRP4) , DRILLSTRING DYNAMICS SENSOR (DDSr) , PRESSURE WHILE DRILLING (PWD) , AND ACOUSTIC CALIPER (ACAL) . 5. MWD RUN 6 COMPRISED DIRECTIONAL, PRESSURE CASE GAMMA MODULE (PCG) WITH SCINTILLATION DETECTORS, AZIMUTHAL DEEP RESISTIVITY (ADR) , DDSr, PWD, AND GEOPILOT ROTARY STEERABLE BHA (GP) . GAPS IN PCG RECORDED DATA WERE FILLED IN WITH REAL TIME DATA. 6. MWD DATA ARE CONSIDERED PDC PER DISCUSSION OF ALPINE LOGGING REQUIRE- MENTS AT CONOCO-PHILLIPS/VENDOR MEETING HELD ON 26 SEPTEMBER 2001. DOUG KNOCK (CPAI) CONFIRMED THAT THIS WOULD ALSO BE THE CASE FOR THE DRILL SITES 3 AND 4 WELLS IN A PHONE CONVERSATION WITH BUSTER BRYANT (SD) ON 27 APRIL 2005. 7. MWD RUNS 1, 4, 6 REPRESENT WELL CD4-208A WITH API#: 50-103-20517-01. THIS WELL REACHED A TOTAL DEPTH (TD) OF 19289'MD/7464'TVD. MNEMONICS CURVE DESCRIPTION ROPA AVERAGE RATE OF PENETRATION DGRC DGR COMBINED GAMMA RAY PGGR PCG GAMMA RAY RO9P 9 INCH PHASE RESISTIVITY R15P 15 INCH PHASE RESISTIVITY R27P 27 INCH PHASE RESISTIVITY R39P 39 INCH PHASE RESISTIVITY EWXT EWR FORMATION EXPOSURE TIME ACHD ACAL HOLE DIAMETER AH1P Avg 16in 2M Phase Res AM2P Avg 32in 500k Phase Res AM3P Avg 48in 500k Phase Res ADXT ADR FORMATION EXPOSURE TIME ALL DATA CURVES ARE SMOOTHED TO A STEP OF 0.5 FT, WITH A WINDOW OF 0.6 FT, EXCEPT FOR SROP AND SGRC. THESE CURVES ARE SMOOTHED WITH A 1.1 FT WINDOW. GAP FILL IS SET TO 5 FT FOR ALL CURVES. File Header Service name STSLIB.001 Service Sub Level Name Version Number 1 0 0 Date of Generation 11/06/30 Maximum Physical Record65535 File Type LO Previous File Name STSLIB.000 Comment Record FILE HEADER FILE NUMBER: 1 EDITED MERGED MWD Depth shifted and clipped curves; all bit runs merged. DEPTH INCREMENT: .5000 FILE SUMMARY PBU TOOL CODE START DEPTH STOP DEPTH GR 2500.0 19213.0 RPD 2590.0 12213.5 RPX 2590.0 12213.5 RPS 2590.0 12213.5 RPM 2590.0 12213.5 FET 2594.0 19243.5 ROP 2630.5 19289.0 CALA 6765.0 12182.5 AH1P 12217.5 19243.5 AM2P 12217.5 19243.5 AM3P 12217.5 19243.5 BASELINE CURVE FOR SHIFTS: CURVE SHIFT DATA (MEASURED DEPTH) EQUIVALENT UNSHIFTED DEPTH BASELINE DEPTH MERGED DATA SOURCE PBU TOOL CODE BIT RUN NO MERGE TOP MERGE BASE MWD 1 2500.0 5767.0 MWD 4 5767.5 12263.0 MWD 6 12263.0 19289.0 REMARKS: MERGED MAIN PASS. Data Format Specification Record Data Record Type 0 Data Specification Block Type 0 Logging Direction Down Optical log depth units Feet Data Reference Point Undefined Frame Spacing 60 .1IN Max frames per record Undefined Absent value -999 Depth Units Datum Specification Block sub-type. . .0 . Name Service Order Units Size Nsam Rep Code Offset Channel DEPT FT 4 1 68 0 1 CALA MWD IN 4 1 68 4 2 AH1P MWD OHMM 4 1 68 8 3 AM2P MWD OHMM 4 1 68 12 4 AM3P MWD OHMM 4 1 68 16 5 GR MWD API 4 1 68 20 6 FET MWD HR 4 1 68 24 7 RPX MWD OHMM 4 1 68 28 8 RPS MWD OHMM 4 1 68 32 9 RPM MWD OHMM 4 1 68 36 10 RPD MWD OHMM 4 1 68 40 11 ROP MWD FPH 4 1 68 44 12 First Last Name Service Unit Min Max Mean Nsam Reading Reading DEPT FT 2500 19289 10894.5 33579 2500 19289 CALA MWD IN 8.49 11.52 9.43966 10836 6765 12182.5 AH1P MWD OHMM 2.28 5000 135.739 14053 12217.5 19243.5 AM2P MWD OHMM 0.02 2000 89.0309 14053 12217.5 19243.5 AM3P MWD OHMM 0.02 2000 106.836 14053 12217.5 19243.5 GR MWD API 21.24 484.55 97.8436 33427 2500 19213 FET MWD HR 0.27 325.51 1.6427 33293 2594 19243.5 RPX MWD OHMM 0.08 1773.99 6.19853 19248 2590 12213.5 RPS MWD OHMM 0.09 1896.42 6.70985 19248 2590 12213.5 RPM MWD OHMM 0.1 2000 7.26271 19248 2590 12213.5 RPD MWD OHMM 0.6 2000 8. 60539 19248 2590 12213.5 ROP MWD FPH 1.79 430.53 104.783 33318 2630.5 19289 First Reading For Entire File 2500 Last Reading For Entire File 19289 File Trailer Service name STSLIB.001 Service Sub Level Name Version Number 1 0 0 Date of Generation 11/06/30 Maximum Physical Record65535 File Type LO Next File Name STSLIB.002 Physical EOF File Header Service name STSLIB.002 Service Sub Level Name Version Number 1 0 0 Date of Generation 11/06/30 Maximum Physical Record65535 File Type LO Previous File Name STSLIB.001 Comment Record FILE HEADER FILE NUMBER: 2 RAW MWD Curves and log header data for each bit run in separate files. BIT RUN NUMBER: 1 DEPTH INCREMENT: .5000 FILE SUMMARY VENDOR TOOL CODE START DEPTH STOP DEPTH DGRC 2500.0 5767.0 R15P 2590.0 5767.0 R09P 2590.0 5767.0 R39P 2590.0 5767.0 R27P 2590.0 5767.0 EWXT 2594.0 5767.0 ROPA 2630.5 5767.0 $ LOG HEADER DATA DATE LOGGED: 25-MAY-11 SOFTWARE SURFACE SOFTWARE VERSION: Insite DOWNHOLE SOFTWARE VERSION: 88.2 DATA TYPE (MEMORY OR REAL-TIME) : Memory TD DRILLER (FT) : 5767.0 TOP LOG INTERVAL (FT) : 2630.0 BOTTOM LOG INTERVAL (FT) : 5767.0 BIT ROTATING SPEED (RPM) : HOLE INCLINATION (DEG MINIMUM ANGLE: 27.6 MAXIMUM ANGLE: 87.8 TOOL STRING (TOP TO BOTTOM) VENDOR TOOL CODE TOOL TYPE TOOL NUMBER DGR DUAL GAMMA RAY 10718520 EWR4 ELECTROMAG. RESIS. 4 127479 CTN COMP THERMAL NEUTRON 244601 BOREHOLE AND CASING DATA OPEN HOLE BIT SIZE (IN) : 8.750 DRILLER'S CASING DEPTH (FT) : 2594.0 BOREHOLE CONDITIONS MUD TYPE: Fresh Water Gel MUD DENSITY (LB/G) : 10.30 MUD VISCOSITY (S) : 43.0 MUD PH: 9.8 MUD CHLORIDES (PPM) : 57000 FLUID LOSS (C3) : 3.8 RESISTIVITY (OHMM) AT TEMPERATURE (DEGF) MUD AT MEASURED TEMPERATURE (MT) : .080 68.0 MUD AT MAX CIRCULATING TERMPERATURE: .040 159.1 MUD FILTRATE AT MT: .060 68.0 MUD CAKE AT MT: .120 68.0 NEUTRON TOOL MATRIX: MATRIX DENSITY: HOLE CORRECTION (IN) : TOOL STANDOFF (IN) : EWR FREQUENCY (HZ) : REMARKS: $ Data Format Specification Record Data Record Type 0 Data Specification Block Type 0 Logging Direction Down Optical log depth units Feet Data Reference Point Undefined Frame Spacing 60 .1IN Max frames per record Undefined Absent value -999 Depth Units Datum Specification Block sub-type. . .0 Name Service Order Units Size Nsam Rep Code Offset Channel DEPT FT 4 1 68 0 1 GR MWDO10 API 4 1 68 4 2 FET MWD010 HR 4 1 68 8 3 RPX MWD010 OHMM 4 1 68 12 4 RPS MWDO10 OHMM 4 1 68 16 5 RPM MWD010 OHMM 4 1 68 20 6 RPD MWD010 OHMM 4 1 68 24 7 ROP MWD010 FPH 4 1 68 28 8 First Last Name Service Unit Min Max Mean Nsam Reading Reading DEPT FT 2500 5767 4133.5 6535 2500 5767 GR MWDO10 API 67.34 210.52 135.213 6535 2500 5767 FET MWDO10 HR 0.48 10.27 1.03431 6347 2594 5767 RPX MWDO10 OHMM 0.08 1773.99 4.52352 6355 2590 5767 RPS MWDO10 OHMM 0.09 1896.42 5.59963 6355 2590 5767 RPM MWDO10 OHMM 0.1 2000 6.74572 6355 2590 5767 RPD MWDO10 OHMM 0.6 2000 10.5706 6355 2590 5767 ROP MWDO10 FPH 1.79 123.23 91.1649 6274 2630.5 5767 First Reading For Entire File 2500 Last Reading For Entire File 5767 File Trailer Service name STSLIB.002 Service Sub Level Name Version Number 1 0 0 Date of Generation 11/06/30 Maximum Physical Record65535 File Type LO Next File Name STSLIB.003 Physical EOF File Header Service name STSLIB.003 Service Sub Level Name Version Number 1 0 0 Date of Generation 11/06/30 Maximum Physical Record65535 File Type LO Previous File Name STSLIB.002 Comment Record FILE HEADER FILE NUMBER: 3 RAW MWD Curves and log header data for each bit run in separate files. BIT RUN NUMBER: 4 DEPTH INCREMENT: .5000 FILE SUMMARY VENDOR TOOL CODE START DEPTH STOP DEPTH ROPA 5767.5 12263.0 R39P 5767.5 12213.5 R27P 5767.5 12213.5 R15P 5767.5 12213.5 R09P 5767.5 12213.5 EWXT 5767.5 12213.5 DGRC 5767.5 12204.0 ACHD 6765.0 12182.5 LOG HEADER DATA DATE LOGGED: 07-JUN-11 SOFTWARE SURFACE SOFTWARE VERSION: Insite DOWNHOLE SOFTWARE VERSION: 88.2 DATA TYPE (MEMORY OR REAL-TIME) : Memory TD DRILLER (FT) : 12263.0 TOP LOG INTERVAL (FT) : 5767.0 BOTTOM LOG INTERVAL (FT) : 12263.0 BIT ROTATING SPEED (RPM) : HOLE INCLINATION (DEG MINIMUM ANGLE: 53.9 MAXIMUM ANGLE: 67.4 TOOL STRING (TOP TO BOTTOM) VENDOR TOOL CODE TOOL TYPE TOOL NUMBER DGR DUAL GAMMA RAY 124724 EWR4 ELECTROMAG. RESIS. 4 228269 CTN COMP THERMAL NEUTRON 185457 BOREHOLE AND CASING DATA OPEN HOLE BIT SIZE (IN) : 8.750 DRILLER'S CASING DEPTH (FT) : 2594.0 BOREHOLE CONDITIONS MUD TYPE: Polymer MUD DENSITY (LB/G) : 11.00 MUD VISCOSITY (S) : 41.0 MUD PH: 9.6 MUD CHLORIDES (PPM) : 2000 FLUID LOSS (C3) : 8.5 RESISTIVITY (OHMM) AT TEMPERATURE (DEGF) MUD AT MEASURED TEMPERATURE (MT) : 1.500 68.0 MUD AT MAX CIRCULATING TERMPERATURE: .730 147.2 MUD FILTRATE AT MT: 2.100 68.0 MUD CAKE AT MT: 1.800 68.0 NEUTRON TOOL MATRIX: MATRIX DENSITY: HOLE CORRECTION (IN) : TOOL STANDOFF (IN) : EWR FREQUENCY (HZ) : REMARKS: Data Format Specification Record Data Record Type 0 Data Specification Block Type 0 Logging Direction Down Optical log depth units Feet Data Reference Point Undefined Frame Spacing 60 . 1IN Max frames per record Undefined Absent value -999 Depth Units Datum Specification Block sub-type. . .0 Name Service Order Units Size Nsam Rep Code Offset Channel DEPT FT 4 1 68 0 1 CALA MWD040 IN 4 1 68 4 2 GR MWD040 API 4 1 68 8 3 FET MWD040 HR 4 1 68 12 4 RPX MWD040 OHMM 4 1 68 16 5 RPS MWD040 OHMM 4 1 68 20 6 RPM MWD040 OHMM 4 1 68 24 7 RPD MWD040 OHMM 4 1 68 28 8 ROP MWD040 FPH 4 1 68 32 9 First Last Name Service Unit Min Max Mean Nsam Reading Reading DEPT FT 5767.5 12263 9015.25 12992 5767.5 12263 CALA MWD040 IN 8.49 11.52 9.43966 10836 6765 12182.5 GR MWD040 API 50.79 484.55 117.473 12874 5767.5 12204 FET MWD040 HR 0.27 325.51 0.99898 12893 5767.5 12213.5 RPX MWD040 OHMM 1.91 28. 61 7.02415 12893 5767.5 12213.5 RPS MWD040 OHMM 2.09 28.41 7.25707 12893 5767.5 12213.5 RPM MWD040 OHMM 2.39 26.16 7.51754 12893 5767.5 12213.5 RPD MWD040 OHMM 2.66 28.5 7. 63672 12893 5767.5 12213.5 ROP MWD040 FPH 1.89 430.53 126.883 12992 5767.5 12263 First Reading For Entire File 5767.5 Last Reading For Entire File 12263 File Trailer Service name STSLIB.003 Service Sub Level Name Version Number 1 0 0 Date of Generation 11/06/30 Maximum Physical Record65535 File Type LO Next File Name STSLIB.004 Physical EOF File Header Service name STSLIB.004 Service Sub Level Name Version Number 1 0 0 Date of Generation 11/06/30 Maximum Physical Record65535 File Type LO Previous File Name STSLIB.003 Comment Record FILE HEADER FILE NUMBER: 4 RAW MWD Curves and log header data for each bit run in separate files. BIT RUN NUMBER: 6 DEPTH INCREMENT: .5000 FILE SUMMARY VENDOR TOOL CODE START DEPTH STOP DEPTH PGGR 12204.5 19213.0 ADXT 12217.5 19243.5 AH1P 12217.5 19243.5 AM2P 12217.5 19243.5 AM3P 12217.5 19243.5 ROPA 12263.5 19289.0 LOG HEADER DATA DATE LOGGED: 23-JUN-11 SOFTWARE SURFACE SOFTWARE VERSION: Insite DOWNHOLE SOFTWARE VERSION: 88.2 DATA TYPE (MEMORY OR REAL-TIME) : Memory TD DRILLER (FT) : 19289.0 TOP LOG INTERVAL (FT) : 12263.0 BOTTOM LOG INTERVAL (FT) : 19289.0 BIT ROTATING SPEED (RPM) : HOLE INCLINATION (DEG MINIMUM ANGLE: 71.7 MAXIMUM ANGLE: 95. 9 TOOL STRING (TOP TO BOTTOM) VENDOR TOOL CODE TOOL TYPE TOOL NUMBER PCG Natural gamma ray 11579788 ADR Azimuthal Deep Resis 11574215 BOREHOLE AND CASING DATA OPEN HOLE BIT SIZE (IN) : 6.125 DRILLER'S CASING DEPTH (FT) : 12252.0 BOREHOLE CONDITIONS MUD TYPE: Mineral Oil Base MUD DENSITY (LB/G) : 9.00 MUD VISCOSITY (S) : 49.0 MUD PH: MUD CHLORIDES (PPM) : 46000 FLUID LOSS (C3) : 4 .3 RESISTIVITY (OHMM) AT TEMPERATURE (DEGF) MUD AT MEASURED TEMPERATURE (MT) : MUD AT MAX CIRCULATING TERMPERATURE: 179.0 MUD FILTRATE AT MT: MUD CAKE AT MT: NEUTRON TOOL MATRIX: MATRIX DENSITY: HOLE CORRECTION (IN) : TOOL STANDOFF (IN) : EWR FREQUENCY (HZ) : REMARKS: Data Format Specification Record Data Record Type 0 Data Specification Block Type 0 Logging Direction Down Optical log depth units Feet Data Reference Point Undefined Frame Spacing 60 .1IN Max frames per record Undefined Absent value -999 Depth Units Datum Specification Block sub-type. . .0 Name Service Order Units Size Nsam Rep Code Offset Channel DEPT FT 4 1 68 0 1 FET MWD060 HR 4 1 68 4 2 AH1P MWD060 OHMM 4 1 68 8 3 AM2P MWD060 OHMM 4 1 68 12 4 AM3P MWD060 OHMM 4 1 68 16 5 GR MWD060 API 4 1 68 20 6 ROP MWD060 FPH 4 1 68 24 7 First Last Name Service Unit Min Max Mean Nsam Reading Reading DEPT FT 12204.5 19289 15746.8 14170 12204.5 19289 FET MWD060 HR 0.41 183.96 2.50807 14053 12217.5 19243.5 AH1P MWD060 OHMM 2.28 5000 135.739 14053 12217.5 19243.5 AM2P MWD060 OHMM 0.02 2000 89.0309 14053 12217.5 19243.5 AM3P MWD060 OHMM 0.02 2000 106.836 14053 12217.5 19243.5 GR MWD060 API 21.24 153. 68 62.3957 14018 12204.5 19213 ROP MWD060 FPH 2.83 154.09 90.4296 14052 12263.5 19289 First Reading For Entire File 12204.5 Last Reading For Entire File 19289 File Trailer Service name STSLIB.004 Service Sub Level Name Version Number 1 0 0 Date of Generation 11/06/30 Maximum Physical Record65535 File Type LO Next File Name STSLIB.005 Physical EOF Tape Trailer Service name LISTPE Date 11/06/30 Origin STS Tape Name UNKNOWN Continuation Number 01 Next Tape Name UNKNOWN Comments STS LIS Writing Library. Scientific Technical Services Reel Trailer Service name LISTPE Date 11/06/30 Origin STS Reel Name UNKNOWN Continuation Number 01 Next Reel Name UNKNOWN Comments STS LIS Writing Library. Scientific Technical Services Physical EOF Physical EOF End Of LIS File Sperry-Sun Dri—ing Services LIS Scan Utility $Revision: 3 $ LisLib $Revision: 4 $ Fri Jun 24 09:23:22 2011 Reel Header Service name LISTPE Date 11/06/24 Origin STS Reel Name UNKNOWN Continuation Number 01 Previous Reel Name UNKNOWN Comments STS LIS Writing Library. Scientific Technical Services Tape Header Service name LISTPE Date 11/06/24 Origin STS Tape Name UNKNOWN Continuation Number 01 Previous Tape Name UNKNOWN Comments STS LIS Writing Library. Scientific Technical Services Physical EOF Comment Record TAPE HEADER Colville River MWD/MAD LOGS WELL NAME: CD4-208APB1 API NUMBER: 501032051771 OPERATOR: ConocoPhillips Alaska, Inc. LOGGING COMPANY: Sperry Drilling TAPE CREATION DATE: 24-JUN-11 JOB DATA MWD RUN 1 JOB NUMBER: -XX-0008065746 LOGGING ENGINEER: PAUL ORTH OPERATOR WITNESS: DAVE BURLEY4 1 6 SURFACE LOCATION SECTION: 24 TOWNSHIP: 11N RANGE: 4E FNL: 2919 FSL: FEL: 206 FWL: ELEVATION (FT FROM MSL 0) KELLY BUSHING: DERRICK FLOOR: 56.13 GROUND LEVEL: 19.80 WELL CASING RECORD OPEN HOLE CASING DRILLERS BIT SIZE (IN) SIZE (IN) DEPTH (FT) 1ST STRING 8.750 9. 625 2594 .0 2ND STRING 3RD STRING PRODUCTION STRING .Z OG REMARKS: 1. ALL DEPTHS ARE BIT DEPTHS UNLESS OTHERWISE NOTED. THESE DEPTHS ARE MEASURED DEPTH (MD) . 2. ALL VERTICAL DEPTHS ARE TRUE VERTICAL DEPTH (TVD) . 3. THIS WELLBORE EXITS CD4-208 AT 2630'MD/2471'TVD, BY DRILLING OFF OF A CEMENT PLUG OUT OF THE 9.625" CASING SHOE. 4. MWD RUN 1 COMPRISED DIRECTIONAL, DUAL GAMMA RAY (DGR) UTILIZING GEIGER- MUELLER TUBE DETECTORS, ELECTROMAGNETIC WAVE RESISTIVITY PHASE-4 (EWRP4) , DRILLSTRING DYNAMICS SENSOR (DDSr) , PRESSURE WHILE DRILLING (PWD) , AND ACOUSTIC CALIPER (ACAL) . 5. MWD DATA ARE CONSIDERED PDC PER DISCUSSION OF ALPINE LOGGING REQUIRE- MENTS AT CONOCO-PHILLIPS/VENDOR MEETING HELD ON 26 SEPTEMBER 2001. DOUG KNOCK (CPAI) CONFIRMED THAT THIS WOULD ALSO BE THE CASE FOR THE DRILL SITES 3 AND 4 WELLS IN A PHONE CONVERSATION WITH BUSTER BRYANT (SD) ON 27 APRIL 2005. 6. MWD RUN 1 REPRESENTS WELL CD4-208A PB1 WITH API#: 50-103-20517-71. THIS WELL REACHED A TOTAL DEPTH (TD) OF 11703'MD/7375'TVD. MNEMONICS CURVE DESCRIPTION ROPA AVERAGE RATE OF PENETRATION DGRC DGR COMBINED GAMMA RAY R09P 9 INCH PHASE RESISTIVITY R15P 15 INCH PHASE RESISTIVITY R27P 27 INCH PHASE RESISTIVITY R39P 39 INCH PHASE RESISTIVITY EWXT EWR FORMATION EXPOSURE TIME ACHD ACAL HOLE DIAMETER ALL DATA CURVES ARE SMOOTHED TO A STEP OF 0.5 FT, WITH A WINDOW OF 0. 6 FT, EXCEPT FOR SROP AND SGRC. THESE CURVES ARE SMOOTHED WITH A 1.1 FT WINDOW. GAP FILL IS SET TO 5 FT FOR ALL CURVES. File Header Service name STSLIB.001 • Service Sub Level Name Version Number 1 0 0 Date of Generation 11/06/24 Maximum Physical Record65535 File Type LO Previous File Name STSLIB.000 Comment Record FILE HEADER FILE NUMBER: 1 EDITED MERGED MWD Depth shifted and clipped curves; all bit runs merged. DEPTH INCREMENT: .5000 FILE SUMMARY PBU TOOL CODE START Dr,rTH STOP DEPTH GR = _ 2500.0 11645.0 RPD 2594.0 11655.0 RPM 2594.0 11655.0 RPX 2594 .0 11655.0 FET 2594.0 11655.0 RPS 2594.0 11655.0 ROP 2630.5 11703.0 CALA 8858.0 11624.0 $ BASELINE CURVE FOR SHIFTS: CURVE SHIFT DATA (MEASURED DEPTH) EQUIVALENT UNSHIFTED DEPTH BASELINE DEPTH $ MERGED DATA SOURCE PBU TOOL CODE BIT RUN NO MERGE TOP MERGE BASE MWD 1 2500.0 11703.0 $ REMARKS: MERGED MAIN PASS. $ Data Format Specification Record Data Record Type 0 Data Specification Block Type 0 Logging Direction Down Optical log depth units Feet Data Reference Point Undefined Frame Spacing 60 .1IN Max frames per record Undefined Absent value -999 Depth Units Datum Specification Block sub-type. . .0 Name Service Order Units Size Nsam Rep Code Offset Channel DEPT FT 4 1 68 0 1 CALA MWD IN 4 1 68 4 2 GR MWD API 4 1 68 8 3 FET MWD HR 4 1 68 12 4 RPX MWD OHMM 4 1 68 16 5 RPS MWD OHMM 4 1 68 20 6 RPM MWD OHMM 4 1 68 24 7 RPD MWD OHMM 4 1 68 28 8 ROP MWD FPH 4 1 68 32 9 First Last Name Service Unit Min Max Mean Nsam Reading Reading DEPT FT 2500 11703 7101.5 18407 2500 11703 CALA MWD IN 8.55 10.77 9.20845 4360 8858 11624 GR MWD API 63.38 463.25 131.997 18291 2500 11645 FET MWD HR 0.48 16.94 1.01625 18123 2594 11655 RPX MWD OHMM 0.08 1773. 99 4.852 18123 2594 11655 RPS MWD OHMM 0.09 1896.42 5.83214 18123 2594 11655 RPM MWD OHMM 0.1 2000 6.61717 18123 2594 11655 RPD MWD OHMM 0.6 2000 7.41381 18123 2594 11655 ROP MWD FPH 1.79 279.22 90.367 18146 2630.5 11703 First Reading For Entire File 2500 Last Reading For Entire File 11703 File Trailer Service name SiSLIB.001 Service Sub Level Name - Version Number 1 0 0 Date of Generation 11/06/24 Maximum Physical Record65535 File Type LO Next File Name STSLIB.002 Physical EOF File Header Service name STSLIB.002 Service Sub Level Name Version Number 1 0 0 Date of Generation 11/06/24 Maximum Physical Record65535 File Type LO Previous File Name STSLIB.001 Comment Record FILE HEADER FILE NUMBER: 2 RAW MWD Curves and log header data for each bit run in separate files. BIT RUN NUMBER: 1 DEPTH INCREMENT: .5000 FILE SUMMARY VENDOR TOOL CODE START DEPTH STOP DEPTH DGRC 2500.0 11645.0 RO9P 2594.0 11655.0 R39P 2594.0 11655.0 EWXT 2594.0 11655.0 R27P 2594.0 11655.0 R15P 2594.0 11655.0 ROPA 2630.5 11703.0 ACHD 8858.0 11624.0 LOG HEADER DATA DATE LOGGED: 25-MAY-11 SOFTWARE SURFACE SOFTWARE VERSION: Insite DOWNHOLE SOFTWARE VERSION: 88.20 DATA TYPE (MEMORY OR REAL-TIME) : Memory TD DRILLER (FT) : 11703.0 TOP LOG INTERVAL (FT) : 2500.0 BOTTOM LOG INTERVAL (FT) : 11703.0 BIT ROTATING SPEED (RPM) : HOLE INCLINATION (DEG MINIMUM ANGLE: 27.6 MAXIMUM ANGLE: 87.8 TOOL STRING (TOP TO BOTTOM) VENDOR TOOL CODE TOOL TYPE TOOL NUMBER DGR DUAL GAMMA RAY 10718520 EWR4 ELECTROMAG. RESIS. 4 127479 ACAL Acoustic Caliper BOREHOLE AND CASING DATA OPEN HOLE BIT SIZE (IN) : 8.750 DRILLER'S CASING DEPTH (FT) : 2594.0 BOREHOLE CONDITIONS MUD TYPE: Fresh Water Gel MUD DENSITY (LB/G) : 10.30 MUD VISCOSITY (S) : 43.0 MUD PH: 9.8 MUD CHLORIDES (PPM) : 57000 FLUID LOSS (C3) : 3.8 RESISTIVITY (OHMM) AT TEMPERATURE (DEGF) MUD AT MEASURED TEMPERATURE (MT) : .080 68.0 MUD AT MAX CIRCULATING TERMPERATURE: .040 159. 1 MUD FILTRATE AT MT: .060 68.0 MUD CAKE AT MT: .120 68.0 NEUTRON TOOL MATRIX: MATRIX DENSITY: HOLE CORRECTION (IN) : TOOL STANDOFF (IN) : EWR FREQUENCY (HZ) : REMARKS: $ Data Format Specification Record Data Record Type 0 Data Specification Block Type 0 Logging Direction Down Optical log depth units Feet Data Reference Point Undefined Frame Spacing 60 .1IN Max frames per record Undefined Absent value -999 Depth Units Datum Specification Block sub-type. . .0 Name Service Order Units Size Nsam Rep Code Offset Channel DEPT FT 4 1 68 0 1 CALA MWDO10 IN 4 1 68 4 2 GR MWDO10 API 4 1 68 8 3 FET MWDO10 HR 4 1 68 12 4 RPX MWDO10 OHMM 4 1 68 16 5 RPS MWDO10 OHMM 4 1 68 20 6 RPM MWDO10 OHMM 4 1 68 24 7 RPD MWDO10 OHMM 4 1 68 28 8 ROP MWD010 FPH 4 1 68 32 9 First Last Name Service Unit Min Max Mean Nsam Reading Reading DEPT FT 2500 11703 7101.5 18407 2500 11703 CALA MWDO10 IN 8.55 10.77 9.20845 4360 8858 11624 GR MWDO10 API 63.38 463.25 131. 997 18291 2500 11645 FET MWDO10 HR 0.48 16.94 1.01625 18123 2594 11655 RPX MWD010 OHMM 0.08 1773. 99 4.852 18123 2594 11655 RPS MWD010 OHMM 0.09 1896.42 5.83214 18123 2594 11655 RPM MWD010 OHMM 0.1 2000 6. 61717 18123 2594 11655 RPD MWD010 OHMM 0.6 2000 7.41381 18123 2594 11655 ROP MWD010 FPH 1.79 279.22 90.367 18146 2630.5 11703 First Reading For Entire File 2500 Last Reading For Entire File 11703 File Trailer Service name STSLIB.002 Service Sub Level Name Version Number 1 0 0 Date of Generation 11/06/24 Maximum Physical Record65535 File Type LO Next File Name STSLIB.003 Physical EOF Tape Trailer Service name LISTPE Date 11/06/24 Origin STS Tape Name UNKNOWN Continuation Number 01 Next Tape Name UNKNOWN Comments STS LIS Writing Library. Scientific Technical Services Reel Trailer Service name LISTPE Date 11/06/24 Origin STS Reel Name UNKNOWN Continuation Number 01 Next Reel Name UNKNOWN Comments STS LIS Writing Library. Scientific Technical Services Physical EOF Physical EOF End Of LIS File