Alaska Logo
Department of Commerce, Community, and Economic Development
Alaska Oil and Gas Conservation
Commission
Loading...
HomeMy WebLinkAbout197-007 STATE OF ALASKA ' ,LASKA OIL AND GAS CONSERVATION COMMI• N , WELL COMPLETION OR RECOMPLETION REPORT AND LOG la. Well Status: Oil 0 Gas 0 SPLUG 0 Other 0 Abandoned 0 • Suspended 0 lb.Well Class: 20AAC 25.105 20AAC 25.110 Development ID Exploratory 0 GINJ 0 WINJ 0 WAG 0 WDSPL 0 No.of Completions: Zero • Service 0 Stratigraphic Test 0 2. Operator Name: 6. Date Comp.,Susp., r Aban�: 14.Permit to Drill Number/Sundry BP Exploration(Alaska),Inc 7/13/2015 • 197-007 • 315-073 3. Address: 7. Date Spudded: 15' API Number: P.O.Box 196612 Anchorage,AK 99519-6612 3/2/1997 50-029-22735-60-00 - 4a. Location of Well(Governmental Section): 8. Date TD Reached: 16. Well Name and Number: 4/6/1997 PBU S-44L1_• Surface: 4242'FSL,4502'FEL,Sec.35,T12N,R12E,UM . 17. Field/Pool(s): 9. KB(ft above MSL): 67' • Top of Productive Interval: 4552'FSL,1748'FEL,Sec.34,T12N,R12E,UM GL(ft above MSL): 36.5' • PRUDHOE BAY,PRUDHOE OIL • Total Depth: 225'FSL,4548'FEL,Sec.27,T12N,R12E,UM 10. Plug Back Depth(MD/TVD): 18. Property Designation: 2661'/2661' ADL 028257&028258 • 4b. 4b.Location of Well(State Base Plane Coordinates,NAD 27): 11. Total Depth(MD/TVD): 19. Land Use Permit: Surface:x- 618930• y- 5980445 • Zone - ASP 4 - 12486'/8760' • TPI: x- 616399 y- 5980716 Zone - ASP 4 12. SSSV Depth(MD/TVD): 20 Thickness of Permafrost MD/TVD: Total Depth:x- 613583 y- 5981626 Zone - ASP 4 None 1900'(Approx.) 5. Directional Survey: Yes• 0 (attached) No E1 13. Water Deoth.if Offshore: 21. Re-drill/Lateral Top Window MD/TVD: Submit electronic and printed information per 20 AAC 25.050 N/A (ft MSL) N/A 22. Logs Obtained List all logs run and,pursuant to AS 31.05.030 and 20 AAC 25.071,submit all electronic data and printed logs within 90 days of completion, suspension,or abandonment,whichever occurs first.Types of logs to be listed include,but are not limited to:mud log,spontaneous potential,gamma ray,caliper, resistivity,porosity,magnetic resonance,dipmeter,formation tester,temperature,cement evaluation,casing collar locator,jewelry,and perforation record. Acronyms may be used.Attach a separate page if necessary RECEIVED WLV VD:GR,LD:DIR/FE/DD,RES v G AUG 0 4 2015 23. AOGCC CASING,LINER AND CEMENTING RECORD CASING wr.PER GRADE SETTING DEPTH MD SETTING DEPTH TVD HOLE SIZE CEMENTING RECORD AMOUNT FT. PULLED TOP BOTTOM TOP BOTTOM 20" 91.5# H-40 33' 113' 33' 113' 30" 260 sx Arctic Set(Approx.) 9-5/8" 40# L-80 32' 3132' 32' 3132' 12-1/4" 1181 sx Coldset III,430 sx Class'G' 7" 26# L-80 2910' 9506' 2910' 8751' 8-1/2" 620 sx Class'G' 2880' I 4-1/2" 12.6# L80 9528' 12373' 8761' 8758' 6" Uncemented Slotted Liner 24. Open to production or injection? Yes 0 No I 25. TUBING RECORD If Yes,list each interval open(MD/TVD of Top and Bottom;Perforation GRADE DEPTH SET(MD) PACKER SET(MD/TV Size and Number): , ,4) 4-1/2",12.6#,13C/80/L-80 3220'-9245' 9107'/8539'; ,, 9239'/8626' Or. 26. ACID,FRACTURE,CEMENT SQUEEZE,ETC. 0 i *lit./ Was hydraulic fracturing used during completion? Yes 0 No I • SipSEP 0 J w . Per 20 AAC 25.283(i)(2)attach electronic and printed 1 ` information DEPTH INTERVAL(MO) AMOUNT AND KIND OF MATERIAL USED See Attachment 27. PRODUCTION TEST Date First Production: Not on Production Method of Operation(Flowing,gas lift,etc.):N/A Date of Test: Hours Tested: Production for Oil-Bbl: Gas-MCF: Water-Bbl: Choke Size: Gas-Oil Ratio: Test Period Flow Tubing Casing Press: Calculated Oil-Bbl: Gas-MCF: Water-Bbl: Oil Gravity-API(corr): Press 24 Hour Rate Form 10-407 Revised 5/2015 CONTINUED ON PAGE 2 Submit ORIGINAL only V 74 �r/2/ice.Ap 7/0., ,,,..-- 4y - s2 - ,6-- RBDMS��} AUG 1 4 2015 IG 28. ' CORE DATA Conventional Core(s) Yes ❑ No Q . Sidewall Cores Yes 0 No If Yes to either question,list formations and intervals cored(MD+TVD of top and bottom of each),and summarize lithology and presence of oil,gas or water (submit separate sheets with this form,if needed).Submit detailed descriptions,core chips,photographs and laboratory analytical results per 20 AAC 25.071. 29. GEOLOGIC MARKERS(List all formations and markers encountered): 30. FORMATION TESTS NAME MD TVD Permafrost-Top Well Tested? Yes 0 No Iv! ' Permafrost-Base If yes,list intervals and formations tested,briefly summarizing test results.Attach separate sheets to this form,if needed,and submit detailed test information per 20 Sag River 9498' 8748' AAC 25.071. Formation at total depth: 31. List of Attachments: Summary of Pre-Rig Work,Summary of Daily Drilling Reports,Well Schematic Diagram Information to be attached includes,but is not limited to:summary of daily operations,wellbore schematic,directional or inclination survey,core analysis,paleontological report,production or well test results,per 20 AAC 25.070. 32.I hereby certify that the foregoing is true and correct to the best of my knowledge. Contact: Leemhuis,Jacob Email: Jacob.Leemhuis@bp.com Printed Name: Joe Lastufka Title: Drilling Technologist Signature: ne: +1 907 564 4091 Date: €4-/i 5 INSTRUCTIONS General:This form is designed for submitting a complete and correct well completion report and log on all types of lands and leases in Alaska.Submit a well schematic diagram with each 10-407 well completion report and 10-404 well sundry report when the downhole well design is changed. All laboratory analytical reports regarding samples or tests from a well must be submitted to the AOGCC,no matter when the analyses are conducted. Item 1 a. Multiple completion is defined as a well producing from more than one pool with production from each pool completely segregated.Each segregated pool is a completion. Item 1 b.Well Class Service wells:Gas Injection,Water Injection,Water-Alternating-Gas Injection,Salt Water Disp,Water Supply for Injection,Observation or Other. Item 4b.TPI(Top of Producing Interval). Item 9. The Kelly Bushing and Ground Level elevations in feet above mean sea level.Use same as reference for depth measurements given in other spaces on this form and in any attachments. Item 15.The API number reported to AOGCC must be 14 digits(ex:50-029-20123-00-00). Item 20.Report true vertical thickness of permafrost in Box 20.Provide MD and TVD for the top and base of permafrost in Box 29. Item 22.Review the reporting requirements of 20 AAC 25.071 and,pursuant to AS 31.05.030,submit all electronic data and printed logs within 90 days of completion,suspension,or abandonment,whichever occurs first. Item 23.Attached supplemental records should show the details of any multiple stage cementing and the location of the cementing tool. Item 24.If this well is completed for separate production from more than one interval(multiple completion),so state in item 1,and in item 23 show the producing intervals for only the interval reported in item 26.(Submit a separate form for each additional interval to be separately produced, showing the data pertinent to such interval). Item 27.Method of Operation:Flowing,Gas Lift,Rod Pump,Hydraulic Pump,Submersible,Water Injection,Gas Injection,Shut-in,or Other(explain). Item 28.Provide a listing of intervals cored and the corresponding formations,and a brief description in this box.Submit detailed description and analytical laboratory information required by 20 AAC 25.071. Item 30.Provide a listing of intervals tested and the corresponding formation,and a brief summary in this box.Submit detailed test and analytical laboratory information required by 20 AAC 25.071. Item 31.Pursuant to 20 AAC 25.070,attach to this form:well schematic diagram,summary of daily well operations,directional or inclination survey,and other tests as required including,but not limited to:core analysis,paleontological report,production or well test results. Form 10-407 Revised 5/2015 Submit ORIGINAL Only WELL NAME: S-44 / L1 26. Acid, Fracture, Cement Squeeze, Etc. Depth Interval (MD) Amount & Kind of Material Used 9159' Set Cement Retainer 9088' 123 Bbls Class 'G' 7703' 41 Bbls Class 'G' 3220' Cut & Pull Tubing 2910' Cut & Pull 7" Casing 2764' Set EZSV 2743' Set Whipstock 2682' Set 2nd EZSV 2661' Set 2nd Whipstock S-44 / LI, Well History (Pre-Rig Sidetrack) T/I/O=SSV/650/150, Temp=Sl. PPPOT-T (PASS), PPPOT-IC (PASS), pre RST. PPPOT-T: Stung into test void (100 psi), bled void to 0 psi. Functioned LDS, all moved freely. Torqued to 400 ft/lbs. Pumped through void, good returns. Pressured test void to 5,000 psi for 30 minute test, lost 100 psi in 15 minutes, lost 50 psi in second 15 minutes. (PASS) Bled void to 0 psi. PPPOT-IC: Stung into test void (0+ psi), bled void to 0 psi. Functioned LDS, all moved freely. Torqued to 400 ft/lbs. Pumped through void, good returns. Pressured test void to 3,500 psi for 30 minute test, lost 100 psi 5/6/2015 in 15 minutes, lost 0 psi in second 15 minutes. (PASS) Bled void to 0 psi. (HES ELINE: SET CEMENT RETAINER). UNIT STUCK WHILE TRYING TO SPOT. CALL FOR 5/12/2015 ROADS AND PADS. T/I/0=2027/697/146, Temp= SI Assist E-line (Load and test) Loaded tubing with 5 bbls neat meth followed by 300 bbls 1%KCL and a 70 bbls diesel freeze protect. E-line set Cement Retainer. Pressured up IA with additional 6 bbls diesel to reach 2525 psi. MIT-T lost 59 psi i 1st 15 minutes and 7 psi i 2nd 15 minutes for a total loss of 66 psi in a 30 minutes test. Bled down tbg psi (-4 bbls). 5/13/2015 E-line on well upon departure. FWHP's= 200/410/235. (HES ELINE: SET CEMENT RETAINER). RIG UP PCE AND SETTING TOOL, PRESSURE TEST TO 300 PSI LOW AND 3500 PSI HIGH. RIH WITH 4-1/2" HES EZ-DRILL SQUEEZE PACKER (CORRELATE TO TUBING DETAIL RECORD DATED 24-JUN-06). SET PACKER ME @ 9160' MD. (TOP @ 9159' MD). CONDUCT MIT-T WITH TOOL AT SURFACE. RIG DOWN. WELL LEFT 5/13/2015 SHUT IN - DSO NOTIFIED. CTU#6 1.75" CT (P&A- Pre Rig). MIRU. Perform Weekly BOP Test. RIH w/ HES Cmt Retainer Stinger. Circulate safelube while rih. Dry tag retainer @ 9153'. Pumping down backside and circ P tracking WHP, not stung in. Unsting and try again. Pressure WHP to 400psi while pumping cement. 6/1/2015 Pump 123 bbls of 15.8ppg Class G cement. T/I/O - 550/20/175 Assist Slickline MITT PASSED to 2500 psi. (Post cement) Pumped 1 bbl neat to reach test presure tbg lost 29 and 12 psi for a good test bleed tbg back to 300 rig down (slickline 6/2/2015 on well) has control annulus valves open to gauges ) FWHP=300/7/166. CTU#6 1.75" CT (P&A- Pre Rig). Displace 123bbIs cement below retainer. Unsting and lay in 1 bbl cement on top of retainer(TOC= 9088'). Reverse out and POOH. Freeze protect tubing w/38bbls 6/2/2015 50/50 methanol. RDMO. LRS PERFORMS PASSING MIT-T. DRIFTED W/3.70" CENT., 2-1/2" SAMPLE BAILER, S/D & TAG CEMENT © 9,099' SLM ( NO SAMPLE). DRIFTED W/3.25" CENT., 1-3/4" SAMPLE BAILER, 6/2/2015 S/D &TAG CEMENT @ 9,099' SLM. PULL STA#1 BK-DMY @ 9,001' SLM/9,016' MD(leaving as open pocket for circ). DRIFTED W/ 6/3/2015 20' 3.70" DMY WHIPSTOCK TO 2,500' SLM. Job Scope: Fullbore Balance Cement Plug T/I/O 59/680/160. Spot and R/U SLB, LRS and CH2MHill equipment. PJSM. Went over Well Entry Checklist, BP Safety Plan and Contractor Self- Verification. Pressure test SLB and LRS equipment. Crew c/o complete, PJSM. Pumped the job per for the following schedule. All diesel was pumped by LRS: 269 BBL's of fresh water, 86 BBL's of diesel, 89 BBL's fresh water, 41 BBL's 15.8 ppg class 'G' cement, 2 BBL's fresh water(diverted flow through ball launcher and dropped ball), 5 BBL's fresh water(opened all valves on ball launcher), 66 BBL's fresh water, 46 BBL's diesel. T/I/O 22/209/158. Length of cement plug: 1313'. Depth of cement plug: 7703' MD. Type of cement: Class 'G' cement. Weight of cement: 15.8 ppg. Volume of 6/4/2015 cement slurry pumped: 41 BBL's. UCA= 2100 psi @ 17h:23m. T/I/O=60/10/120 Assist SLB w/cement job. Pumped a total of 132 bbls of diesel in two segments assisting cementers. Pumped 6 bbls of diesel to flush return lines to tanks Final WHP = 6/4/2015 240/250/130. 6/5/2015 T/I/O=0/0/0 Temp=SI CMIT-TxIA and MIT-OA (SIDE TRACK) SU/PJSM, RU/PT. BPV PROFILE BRUSHED FOR 1/2 HR. UNABLE TO DRIFT PAST 7,486' SLM W/3.68" CENT. DRIFT TO TOP OF CEMENT @ 7,688' SLM W/2.15" CENT& 1-3/4" S. BAILER, OBTAIN GOOD 6/5/2015 SAMPLE OF CEMENT. S-44 / LI, Well History (Pre-Rig Sidetrack) (SLB E-LINE TUBING CUT). INITIAL T/I/O = 90/180/160. MIRU. PT. RIH WITH 3.65" POWER JET CUTTER AND CUT TUBING AT 3220'. TIED INTO TUBING TALLY DATED 4/22/9. GOOD INDICATION OF CUT AT SURFACE. POOH. RDMO. FINIAL T/I/O = 110/60/160. WELL SHUT IN 6/6/2015 UPON DEPARTURE - DSO NOTIFIED. CMIT-TxIA to 2500 psi PASS, MIT-OA to 3000 FAIL (never reached test pressure). Pumped 3.6 bbls of DSL down Tbg and IA on 2 CMIT-TxIA tests. 2nd Test took Tbg to 2522 psi and IA to 2525 psi. 1st 15 mins Tbg lost 25 psi/ IA lost 42 psi. 2nd 15 mins Tbg lost 18 psi/ IA lost 21 psi. Total Test Tbg lost 43 psi/ IA lost 63 psi. PASS. Pumped 3 bbls down OA for MIT to 3000 psi. At-1 bbls away OA reach about 1930 psi when psi started dropping rapidly. SD took a careful look at well, flutes and cellar. Pumped 2 more bbls of DSL down OA reaching a rate of.5 bpm while OA pressure kept falling off. SD. Notified PE. Bled OA to 40 psi. Got back-1.5 bbls. Bled Tbg and IA psi down got 6/6/2015 back -3 bbls. FWHP's=400/50/40 SV,WV,SSV=C MV=O IA,OA=OTG. T/I/0=68/77/168 Temp=SI. [Obj: Pre Rig]. CMIT TxIA to 2500 psi ***PASSED***. Pumped 2.75 bbls diesel down TBG to reach test pressure. In 1st 15 min. TBG lost 98 psi/IA lost 96 psi. In 2nd 15 min. TBG lost 49 psi/IA lost 48 psi for ttl losses of 147 psi on tbg and 144 psi on IA. Bled back 2.33 bbls diesel. Hung caution tags and AFE sign. SwV, WV, SSV=closed, MV=Open, 6/7/2015 AL=closed, IA/OA=OTG. FWHP=308/324/179. T/I/O= SI/130/220. Start Barriers List= SSVx SV. Set TWC#146. Tagged @125". Installed temp. 6/12/2015 IA valve#74. RDMO. Final T/I/O=TWC/130/220. T/I/O=TWC/200/220. Pre Parker 272, Installed temp#83 as dryhole valve, Temp#11 as OA 6/13/2015 piggyback. Final T/I/O=TWC/200/220. T/I/O =TWC/220/180. Temp = SI. Bleed IA& OAP to 0 psi (Pre Rig). No scaffolding, flowline, wellhouse or AL. Dryhole tree and two way check installed. Bled the IAP from 220 psi to 0 psi in 30 minutes (all fluid, slop tank, 16 gallons). During the IA bleed OAP decreased 40 psi. Bled the OA from 140 psi to 7 psi in 1 hour(9 gallons, fluid &gas). Monitored WHP's for 30 minutes, IAP remained unchanged and the OAP increased 3 psi. FWP's = TWC/0/10. SV= ?. MV= 0. IA, OA= 6/30/2015 OTG. 1450 hrs. North America-ALASKA-BP Page 1 oto Operation Summary Report Common Well Name:S-44 AFE No Event Type:RE-ENTER-ONSHORE(RON) Start Date:7/9/2015 End Date: X3-016P4-C:(7,869,557.00) Project:Prudhoe Bay Site:PB S Pad Rig Name/No.:PARKER 273 Spud Date/Time:3/2/1997 12:00:00AM Rig Release: Rig Contractor PARKER DRILLING CO. UWI:500292273500 Active datum:S-44A actual @81.43usft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (usft) 7/9/2015 06:00 - 07:00 1.00 MOB P PRE PJSM LAY OVER DERRICK 390 K ON RACK 07:00 - 09:00 2.00 MOB P PRE PJSM DISCONNECT FROM HIGH LINE POWER FROM UM,SEPARATE UM FROM DM AND STAGE ON THE SIDE OF PAD 09:00 - 12:00 3.00 MOB P PRE PREP TO MOVE DM OFF OF S-42A MOVE DM OFF WELL,REMOVE RIG MATS IN PREPARATION FOR PAD PREP. SIMOPS -PJSM WITH PEAK CRANE CREW,PARKER AND BP,REMOVE SHAKER#1 FROM MM AND SET ON THE GROUND WITH CRANE. 12:00 - 14:30 2.50 MOB P PRE PJSM MOVE MODULES AWAY FOR PAD PREP -MOVE UM DOWN PAD -MOVE DM AHEAD OF WELL -START PAD PREP WITH GRADER SIMOPS -REMOVE SHAKER BED#3 OUT OF SHAKER ROOM -REMOVE AND INSTALL NEW CHAIN ON MUD PALLET LIFT. 14:30 - 16:00 1.50 MOB P PRE PJSM MOVE DUMMY WELL HOUSE -PULL WELL HOUSE OFF OF S-42A -SPOT WELL HOUSE OVER S-44 -CLEAN CELLAR BOX AREA ON S-42A 16:00 - 20:30 4.50 MOB P PRE PAD PREP -GRADER LEVELED PAD FOR RIG SIMOPS -RAISE ADAPTER FLANGE AND TREE INTO BOP DECK -WORK ON REPLACING SHAKER BEDS 20:30 - 00:00 3.50 MOB P PRE LAY MATS FOR SPOTTING RIG OVER WELL S-42A -WORK ON SHAKER BED REPLACEMENTS -SHAKERS#1 AND#3 ARE IN PLACE -INSTALL HARDWARE WITH PROPER OEM TORQUE SPECS -WORK ON PALLET ELEVATOR CHAIN 7/10/2015 00:00 - 01:30 1.50 MOB P PRE FINISH SETTING MATS IN PLACE FOR SPOTTING RIG. 01:30 - 03:00 1.50 MOB N RREP -2.02 PRE CHANGE OUT SHAKER BDS 03:00 - 07:00 4.00 RIGU P PRE SPOT RIG OVER WELL -SPOT DRILL MOD OVER WELL,CHECK PLUM BOB AND LEVEL DM. -SPOT UTILITY MOD BY DM LEVEL UM -SPOT MUD MOD BY DM LEVEL MM -ELECTRICIAN COMMENCED CONNECTING INTERCONNECTS 07:00 - 08:00 1.00 RIGU P PRE RAISE DERRICK -PJSM COMPLETE DERRICK WALK THROUGH -RAISE DERRICK 500K OFF HEAD ACHE RACK 08:00 - 09:30 1.50 RIGU P PRE RIG UP INTER CONNECTS -COMPLETE RIGGING UP INTER CONNECTS -CHANGE OUT UPPER RAMS F/2 7/8"X 5 1/2" TO 7"FIXED RAMS Printed 7/27/2015 11:19:23AM North America-ALASKA-BP Page 2.048 Operation Summary Report Common Well Name:S-44 AFE No Event Type:RE-ENTER-ONSHORE(RON) Start Date:7/9/2015 End Date: X3-016P4-C:(7,869,557.00) Project:Prudhoe Bay Site:PB S Pad Rig Name/No.:PARKER 273 Spud Date/Time:3/2/1997 12:00:00AM Rig Release: Rig Contractor:PARKER DRILLING CO. UWI:500292273500 Active datum:S-44A actual @81.43usft(above Mean Sea Level) Date From-To Hrs I Task I Code ! NPT NPT Depth I Phase Description of Operations (hr) + I (usft) I 09:30 - 12:00 2.50 RIGU I P I PRE SKID FLOOR I -PJSM SKID RIG FLOOR TO WELL CENTER -RAISE PIPE CAT INTO POSITION SKID CATTLE CHUTE TO RIG FLOOR 12:00 - 15:00 3.00 RIGU P PRE BRIDLE DOWN ,-UNPIN BRIDLE LINES FROM BLOCKS AND SET ON RIG FLOOR '-RAISE BRIDLE LINES TO HANG IN HANGERS INSTALL SECONDARY RETENSION CABLES -LOWER BLOCKS,CONNECT TO TOP DRIVE CONNECT RIG FLOOR MUD LINES,CEMENT !LINE !SIMOPS I-CONTINUE TO REPLACE CHAIN ON PALLET 'LIFT 15:00 - 16:00 1.00 RIGU P PRE 'CONNECT FLUID LINES LN INTERCONNECTS CONNECT MUD LINES,AIR LINES ' RIG ACCEPTED @ 16:00 HRS 7/10/2015 16:00 - 18:00 2.00 RIGU P PRE RIG UP TO TEST TWC -RIG SECONDARY KILL LINE -RIG UP BLEED LINE TO IA 18.00 - 22:30 4.50 RIGU P PRE TEST TWC -TEST TWC FROM BELOW(TEST FAILED DUE TO BAD SENSATOR) ; -REPLACE FAILED SENSATOR -TEST TWC FROM BELOW 250 PSI F/5 MIN 1(GOOD TEST) -TEST TWC FROM BELOW TO 3500 PSI F/5 MIN(GOOD TEST) SWITCH TO TEST PUMP ' -TEST TWC FROM ABOVE 250 PSI F/5 MIN GOOD TEST) HIGH TEST FAILED DUE TO BAD VALVES ON TEST PUMP REPLACE VALVE TEST TWC FROM ABOVE 3500 PSI F/5 MIN ' (GOOD TEST) 22:30 - 23:00 0.50 RIGU P PRE VOID TEST LINES OF FLUIDS BLOW DOWN SECONDARY KILL LINE AND BLED LINE TO TANK 23:00 - 00:00 1.00 RIGU P PRE NIPPLE DOWN TREE , -FMC CHECKED ADAPTER FLANGE FOR PRESSURE 0 PSI -NIPPLE DOWN TREE AND ADAPTER FLANGE AS PER FMC ; -RAISE TREE AND ADAPTER FLANGE TO BOP I DECK AND SECURE -FMC VERIFIED 7 1/2 TURNS TO MAKE UP , TC-11 XO TO HANGER -NO VISUAL DAMAGE ON HANGER THREAD 1-LOWER AND INSTALL DSA ON TUBING 1 SPOOL,TORQUE AS PER SPEC'S 7/11/2015 !00:00 - 06:00 , 6.00 BOPSUR P PRE I PJSM NIPPLE UP BOPE I-PICK UP RISER WITH BLOCKS TO LOWER I ONTO WELL HEAD , 1-INSTALL BOLTS IN RISER I-PICK UP BOP STACK AND SET ON RISER -TORQUE ALL BOLTS TO RECOMMENDED SPEC'S SIMOPS -CALIBRATE TOTCO SENSORS Printed 7/27/2015 11.19.23AM • North America-ALASKA-BP Page 3 pa Operation Summary Report Common Well Name:S-44 AFE No Event Type:RE-ENTER-ONSHORE(RON) Start Date:7/9/2015 End Date: X3-016P4-C:(7,869,557.00) Project:Prudhoe Bay Site:PB S Pad Rig Name/No.:PARKER 273 Spud DaterTime:3/2/1997 12:00:00AM Rig Release: Rig Contractor:PARKER DRILLING CO. UWI:500292273500 Active datum:S-44A actual©81.43usft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (usft) 06:00 - 08:30 2.50 BOPSUR P DECOMP PJSM PREPARE TO TEST BOPE -FILL LINES,STACK AND GAS BUSTER WITH WATER 12.5 BBLS TO FILL GAS BUSTER -PERFORM SHELL TEST 250 PSI LOW,3500 PSI HIGH. 08:30 - 16:00 7.50 BOPSUR P DECOMP TEST BOPE TO 250 PSI LOW,3500 PSI HIGH FOR 5 MINUTES EACH TEST WITH 4",4.5"AND 7"TEST JOINTS -TEST CHOKE MANIFOLD,2 SETS PIPE RAMS,BLIND RAMS,ANNULS ELEMENT,HCR VALVES AND MANUAL VALVES ON STACK, FLOOR VALVES,LOWER AND UPPER IBOP ON TOP DRIVE -ALL TESTS CHARTED -TEST WITNESSED BY AOGCC REP MATT HERRERA 16:00 - 20:00 4.00 BOPSUR P DECOMP RIG UP DUTCH RISER/LUBRICATOR -PRESSURE TEST LUBRICATOR 250 PSI LOW FOR 5 MIN -PRESSURE TEST LUBRICATOR 3500 PSI HIGH FOR 5 MIN(GOOD TESTS) -PULL TWC -RIG DOWN LUBRICATOR RIG DOWN DUTCH RISER 20:00 - 20:30 0.50 BOPSUR P DECOMP CIRCULATE OUT FREEZE PROTECT -PUMP DOWN TUBING 138 BBLS OF 9.3 BRINE,TAKING RETURNS TO TIGER TANK -110 BLLS OF DIESEL RETURNED TO TIGER TANK -CIRCULATE @ 340 GPM ICP=900 PSI FCP= 1150 PSI 20:30 - 21:00 0.50 BOPSUR P DECOMP RIG EVACUATION DRILL -ALL PERSONNEL ACCOUNT FOR AT BRIEFING AREA 4 MINUTES RESPONSE TIME -DISCUSSED DRILL/AAR 21:00 - 22:00 1.00 BOPSUR P DECOMP MAKE UP JOINT AND CROSSOVER TO HANGER -M/U TO TUBING HANGER 7.5 TURNS -BACK OUT LOCK DOWNS AS PER FMC CORRECT MEASUREMENTS OUT ON LOCK DOWNS -PULL HANGER UP 4'HANGER COME FREE OFF SEAT AT 62K 32K STRING WT 22:00 - 22:30 0.50 BOPSUR P DECOMP CIRCULATE WELL BORE -MONITOR WELL FOR 10 MINUTES(WELL STATIC) -CIRCULATE BU 1 TIME,NO DIESEL RETURNS @ 340 GPM 290 PSI 22:30 - 00:00 1.50 BOPSUR P DECOMP PULL HANGER TO FLOOR -BREAK OUT HANGER -LAY DOWN DRILL PIPE AND HANGER MONITOR WELL FOR 10 MIN(STATIC) -POH ON ELEVATORS LAYING DOWN TUBING F/3220 MD TO 2700'MD -BRINE WT 9.3 PPG PU 56K,SO 56K AT 2900' Printed 7/27/2015 11:19:23AM . North America-ALASKA-BP Page 4 Operation Summary Report Common Well Name:S-44 AFE No Event Type:RE-ENTER-ONSHORE(RON) Start Date:7/9/2015 End Date: X3-016P4-C:(7,869,557.00) Project:Prudhoe Bay Site:PB S Pad Rig Name/No.:PARKER 273 Spud Date/Time:3/2/1997 12:00:00AM Rig Release: Rig Contractor:PARKER DRILLING CO. UWI:500292273500 Active datum:S-44A actual©81.43usft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (usft) 7/12/2015 00:00 - 02:30 2.50 CASING P • DECOMP POH ON ELEVATORS I-POH F/2700'TO SURFACE ' -MONITOR WELL VIA TRIP TANK(GOOD I DISPLACEMENT) -LENGTH OF CUT JOINT=3.39'WITH A 4.75" FLARE FROM THE JET CUT 02:30 - 03:00 0.50 CASING P DECOMP PJSM INSTALLING WEAR RING -INSTALL WEAR RING • 1-RIG DOWN DOYON CASING EQUIPMENT AND CLEAR FLOOR I-LOAD FLOOR WITH BAKER MULTI STRING `CUTTER 03:00 07:30 4.50 CASING P • DECOMP IPJSM PICKING UP BHA i-MAKE BHA#1 AS PER BAKER REP -PICK UP 4"DRILL PIPE SINGLE FROM PIPE ISHED I-MONITOR WELL VIA TRIP TANK • SIMOPS • -MOVE LINE FROM IA TO OA,OPEN OA TO TIGER TANK 07.30 - 08:30 ; 1.00 CASING P I DECOMP ,LOCATE COLLARS � -MAKE UP TOP DRIVE,BREAK CIRCULATION j-LOCATE CASING COLLARS AS PER BAKER • I I CREP -POSITION CUTTER AT 2910'MD -CUT 7"CASING @ 2910'MD I-P/U=70K,SO=70K,ROT=68K I-340 GPM @ 1500 PSI -90 RPM WITH 2-3K TORQUE 08:30 - 09:30 1.00 CASING P DECOMP PJSM DISPLACE DEAD CRUDE FROM OA -SHUT IN ANNULAR PREVENTOR I-PUMP DOWN KILL LINE AND DPTAKING RETURNS UP THE OA TO FLOW BACK TANK -PUMP 25 BBLS HIGH VIS SPACER I-PUMP 100 BBLS 9.3 PPG BRINE -40 BBLS DEEP CLEAN PILL 100 BBLS OF 9.3 PPG BRINE 4 -168 GPM @ 250 PSI 09:30 - 11:00 1.50 I CASING P DECOMP POH -MONITOR WELL FOR 10 MIN(STATIC) • -POH ON ELEVATORS F/2941 T/SURFACE BHA #1 -LAY DOWN CUTTER ALL BLADES INTACT SIGNS OF WEAR ON BLADES. -MONITOR WELL VIA TRIP TANK(CORRECT DISPLACEMENT) . 11:00 - 12:00 1.00 CASING ' P DECOMP PULL WEAR RING AND PACK-OFF • -MAKE UP WEAR RING PULLER ' -PULL WEAR RING -MAKE UP PACK-OFF PULLING TOOL -J INTO PACK-OFF AS PER FMC -BACK OUT LOCK DOWN SCREWS ' -PULL PACK-OFF TO FLOOR -LAY DOWN PACK OFF -- 1 12:00 - 14.00 2.00 CASING P DECOMP I PJSM SPEARING 7"CASING -MAKE UP SPEAR TO 4"DP PER BAKER REP -RUN SPEAR INTO 7"CASING -PULL 10K OVER TO ENGAGE SPEAR -PULL 7"HANGER TO RIG FLOOR -P/U=92K =82K STRING WT Printed 7/27/2015 11:19:23AM . '4;4_ North America ALASKA BP Page 5 � Fd: Operation Summary Report Common Well Name S-44 AFE No Event Type:RE-ENTER-ONSHORE(RON) Start Date:7/9/2015 End Date: X3-016P4-C:(7,869,557.00) I Project:Prudhoe Bay Site:PB S Pad Rig Name/No.:PARKER 273 Spud Date/Time:3/2/1997 12:00:00AM Rig Release Rig Contractor:PARKER DRILLING CO. UWI:500292273500 Active datum:S-44A actual @81.43usft(above Mean Sea Level) Date ! From-To Hrs Task Code NPT ! NPT Depth Phase Description of Operations (hr) (usft) 14:00 - 14:30 0.50 CASING P DECOMP PJSM RIG UP CASING EQUIPMENT -BREAK OUT AND LAY DOWN SPEAR -LAY DOWN 7"FLUTED HANGER -M/U XO 7"TO XT-39 14:30 - 15:00 0.50 CASING I P DECOMP 'CIRCULATE -CIRCULATE B/U 1 TIME -340 GPM @ 145 PSI '-MONITOR WELL FOR 10 MIN(STATIC) 15 00 - 19:00 4.00 CASING + P ~ DECOMP I LAY DOWN 7"CASING -POH F/2910 TO SURFACE LAYING DOWN 7" I CASING P/U 50K SO 50K @ 1500' -CUT JOINT=30.68' -70 JOINTS LAID DOWN 19:00 - 20:00 1.00 CASING P DECOMP i CLEAR AND CLEAN FLOOR .-RIG DOWN DOYON CASING EQUIPMENT 20.00 - 20:30 I 0.50 CASING P DECOMP FIRE DRILL WITH ESCALATION INTO A RIG EVACUATION -CRT=6 MINUTES -DRILL FACILITATED BY BP AND PARKER 1 FIELD SUPERINTENDENTS -AAR HELD WITH ALL PERSONNEL INVOLVED TO DISCUSS LESSONS LEARNED 20 30 - 21 00 0.50 CASING P DECOMP M/U DP TO WEAR BUSHING TOOL -SET WEAR BUSHING -RUN IN 4 LOCK DOWN SCREWS 21 00 - 23 30 2.50 CASING P DECOMP PJSM PICKING UP BHA MU CLEAN OUT BHAAS PER BHA RUNNING ' ORDER AND BAKER REP. F/SURFACE T/878'MD 23:30 - 00:00 0.50 CASING P DECOMP RIG SERVICE -GREASE WASH PIPE,BLOCKS,TOP DRIVE . 'ROLLER ASSEMBLY/CROWN CLUSTER 7/13/2015 00:00 - 02:30 2.50 CLEAN P DECOMP PJSM PICK UP DRILL PIPE -RIH WITH 4"DP F/878'MD TO 2911'MID -P/U=106K,S/O=106K @ 2900'MD -TAG CASING STUB @ 2908'MD DP MEASUREMENT -MONITOR WELL VIA TRIP TANK(CORRECT DISPLACEMENT) 02:30 - 03:00 0.50 CLEAN P DECOMP CIRCULATE BOTTOMS UP -CBU 1.5 X,@ 500 GPM,1135 PSI -OBTAIN SPR MP#1=20 SPM=85 PSI,40 I SPM=135 PSI,#2 30 SPM=90 PSI,40 SPM= 135 PSI 2910'MD MW 9.3 BRINE 03:00 - 04 00 1.00 CLEAN P DECOMP PULL OUT OF HOLE I I -MONITOR WELL FOR 10 MIN(STATIC) -POH F/2910'MD T/878/MD MONITOR WELL VIA TRIP TANK(CORRECT DISPLACEMENT) 04 00 - 06 00 2.00 CLEAN P DECOMP I PJSM STAND BACK BHA -STAND BACK 5"HWT DRILL PIPE IN 1 DERRICK I -STAND BACK 6"COLLARS IN DERRICK , -LAY DOWN CLEAN OUT BHA#3 Printed 7/27/2015 11:19:23AM . North America-ALASKA-BP Page 6 0118 Operation Summary Report Common Well Name:S-44 AFE No Event Type:RE-ENTER-ONSHORE(RON) Start Date:7/9/2015 End Date: X3-016P4-C:(7,869,557.00) Project:Prudhoe Bay Site:PB S Pad Rig Name/No.:PARKER 273 Spud Date/Time:3/2/1997 12:00:00AM Rig Release: Rig Contractor:PARKER DRILLING CO. UWI:500292273500 Active datum:S-44A actual©81.43usft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) 4_ (usft) 06:00 - 10:30 4.50 CLEAN P DECOMP !PJSM RIG UP WIRELINE -RIG UP HALLIBURTON WIRELINE ! j-MAKE UP EZSV TO WIRELINE -RUN IN HOLE LOGGING COLLARS -POSITION EZSV @ 2766'E LINE MD -SET EZSV -POH WITH WIRELINE F-RIG DOWN WIRELINE EQUIPMENT CLEAR FLOOR 10:30 - 11:30 1.00 CLEAN P DECOMP I PRESSURE TEST EZSV AND 9 5/8"CASING TEST LOW TO 250 PSI 5 MIN l-TEST HIGH TO 3000 PSI FOR 30 MIN 1-GOOD TESTS 11:30 - 12:30 1.00 CLEAN P DECOMP !PJSM CHANGE RAMS VOID STACK OF LIQUIDS I-CLOSE BLIND RAMS I-CHANGE OUT TOP RAMS F/7"FIXED RAMS T/2 7/8"X 5 1/2"VARIABLES • OPEN BLINDS PULL WEAR BUSHING .-SETTESTPLUG 12:30 - 13:30 ', 1.00 CLEAN ! P DECOMP PJSM TEST VARIABLE RAMS -RIG UP 4"TEST JOINT • -TEST VARIABLE RAMS T/250 PSI LOW,3500 • - IPSI HIGH 5 MIN EACH i I PULL TEST PLUG -INSTALL WEAR BUSHING -LAY DOWN TEST JOINT i -BLOW DOWN CHOKE AND KILL LINES 13:30 - 14:00 0.50 CLEAN P DECOMP SERVICE RIG I-GREASE ST-80,BLOCKS,ELEVATORS,TOP DRIVE,CHECK TD OIL 14:00 - 17:00 3.00 STWHIP P WEXIT PJSM P/U AND RUN WHIPSTOCK MAKE UP WHIP STOCK BHAAS PER BAKER REP T/925' -BRING GYRO TOOLS TO RIG FLOOR 17:00 - 18:30 1.50 STWHIP P WEXIT RUN WHIP STOCK -RIH F/925'MD T/2743'MD -P/U=101K,S/0=105K @ 2743'MD 18:30 - 20:00 1.50 STWHIP P WEXIT PJSM ORIENTATE AND SET WHIP STOCK -R/U AND RUN GYRO ON E-LINE ORIENTATE TO MAGNETIC AZ 281 DEGREES -P/U 102K S/O 106K -TAG EZSV @ 2764 - SET ANCHOR WITH 14K S/O - P/U 10K OVER TO CHECK SET -S/O SHEAR BOLT@41K -PICK UP 3 FOOT TO DISPLACE TO MILLING ' FLUID 20:00 - 21:00 1.00 STWHIP P WEXIT DISPLACE 9.3 PPG BRINE PUMP 20 BBL SPACER ! -PUMP 230 BBLS 9.3 MILLING FLUID BEHIND i SPACER -TRACK BBL IN AND BBL OUT • -OBTAIN SPR MP#1=30 SPM=131 PSI,40 SPM=165 PSI MP#2=30 SPM=132,40 SPM=167 PSI Printed 7/27/2015 11:19:23AM North America-ALASKA-BP Page 7 A8 Operation Summary Report Common Well Name:S-44 AFE No Event Type:RE-ENTER-ONSHORE(RON) Start Date:7/9/2015 End Date: X3-016P4-C:(7,869,557.00) Project:Prudhoe Bay Site:PB S Pad Rig Name/No.:PARKER 273 Spud Date/Time:3/2/1997 12:00:00AM Rig Release: Rig Contractor:PARKER DRILLING CO. UWI:500292273500 Active datum:S-44A actual @81.43usft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (usft) 21:00 - 00:00 3.00 STWHIP P WEXIT MILL WINDOW 5__ j -MILL WINDOW F/2743'TO 2750' �(/V� -500 GPM 760 PSI -100 RPM,TORQUE 5 TO 6K s 4 —P/U 102K,5/0 106K,ROT 103K SIMOPS -BUILDING STANDS WITH OFF LINE STAND BUILDING SYSTEM 7/14/2015 00:00 - 06:00 6.00 STWHIP P WEXIT MILL 8 1/2"WINDOW -MILL WINDOW F/2750'TO 2760' -DRILL 21'OF 8-1/2"OPEN HOLE TO 2,781'MD -500 GPM 760 PSI -100 RPM,TORQUE 5 TO 6K -P/U=102K,S/O=106K,ROT=103K -BACKREAM THROUGH WINDOW AND THEN WORK MILLS THRU WINDOW MULTIPLE TIMES WITH NO PUMPS OR ROTATION TO ENSURE SMOOTH WINDOW -NO DRAG THRU WINDOW TOP OF WINDOW:2,743'MD BOTTOM OF WINDOW:2,760'MD SIMOPS -BUILDING STANDS WITH OFFLINE 06:00 - 07:00 1.00 STWHIP P WEXIT CIRCULATE BOTTOMS UP -PUMP 30 BBL HIGH VIS SUPER SWEEP -500 GPM,915 PSI -METAL SHAVINGS IN RETURNS -MUD WEIGHT:9.3 PPG IN,9.3 PPG OUT -MONITOR WELL FOR 10 MIN:WELL STATIC 07:00 - 08:00 1.00 STWHIP P WEXIT PERFORM LEAK-OFF TEST -MUD WEIGHT:9.3 PPG,2,760'TVD -PUMP 2.1 BBLS AT 0.75 BPM,PRESSURE BROKE OVER AT 1060 PSI,BLEED BACK 2 BBLS -ACHIEVE 16.69 PPG FIT, -DISCUSS RESULTS WITH ODE -BLOW DOWN TEST EQUIPMENT -SEE ATTACHED DOCUMENTATION 08:00 - 08:30 0.50 STWHIP P WEXIT POOH ON ELEVATORS WITH MILLING ASSEMBLY FROM 2,760'MD TO 900'MD -MONITOR WELL FOR 10 MINS PRIOR TO POOH WITH MILLING ASSEMBLY:WELL STATIC -P/U=104K,S/O=101K AT 2,730'MD -MUD WEIGHT:9.3 PPG IN,9.3 PPG OUT -MONITOR WELL VIA TRIP TANK:PROPER DISPLACEMENT 08:30 - 12:00 3.50 STWHIP P WEXIT L/D MILLING BHA FROM 900'MD TO SURFACE -MONITOR WELL FOR 10 MINUTES BEFORE PULLING NON SHEARABLES ACROSS STACK WELL STATIC -L/D 6"DRILL COLLARS -STAND BACK 5"HWDP -WINDOW MILL 1"UNDERGAUGE -MIDDLE MILL 15/16"UNDERGAUGE -UPPER WATERMELON MILL 7/16" UNDERGAUGE DISCUSS PLAN FORWARD WITH ODE Printed 7/27/2015 11:19:23AM North America-ALASKA-BP Page 8 018 Operation Summary Report Common Well Name:S-44 AFE No Event Type:RE-ENTER-ONSHORE(RON) Start Date:7/9/2015 End Date: X3-016P4-C:(7,869,557.00) Project:Prudhoe Bay Site:PB S Pad Rig Name/No.:PARKER 273 Spud Date/Time:3/2/1997 12:00:00AM Rig Release: Rig Contractor:PARKER DRILLING CO. UWI:500292273500 Active datum:S-44A actual @81.43usft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (usft) 12:00 - 14:00 2.00 STWHIP N DPRB 2,760.98 WEXIT PICK UP SECOND WINDOW MILLING ASSEMBLY -CLEAN AND CLEAR RIG FLOOR -SEND OUT OLD BHA AND BRING NEW ONTO RIG FLOOR INSPECT AND GAUGE SAVER SUB 14:00 - 14:30 0.50 STWHIP P WEXIT METHANE GAS AT SHAKER DRILL AND AAR -VISIBLE ALARM CAUGHT CREWS ATTENTION -DRILLER CHECKED FOR FLOWAND WAS INFORMED OF DRILL DRILLER SIMULATED SHUTTING IN WELL AND MADE PROPER ANNOUNCMENT 14:30 - 16:00 1.50 STWHIP N DPRB 2,760.98 WEXIT MAKE UP BAKER MILLING ASSEMBLY FROM SURFACE TO 706'MD -MAKEUP STRING MILL AND WINDOW MILL ASSEMBLY -BKR REP AND SLB DD GAUGE MILLS -ALL MILLS IN GAUGE -8.5"WINDOW MILL,LOWER WATERMELON MILL,FLEX JOINT,UPPER WATERMELON MILL,FLOAT SUB,1 JT 5"HWDP,(3)NM FLEX COLLAR,(18)JTS 5"HWDP,XO 16:00 - 17:30 1.50 STWHIP N DPRB 2,760.98 WEXIT .RIH ON ELEVATORS WITH 8.5"MILLING ASSEMBLY FROM 706'MD TO 2,743'MD -RIH WITH 4"DP FROM DERRICK -BREAK CIRCULATION EVERY 20 STANDS, 500 GPM,900 PSI -MUD WEIGHT:9.3 PPG IN,9.3 PPG OUT -MONITOR WELL VIA TRIP TANK:PROPER DISPLACEMENT 17:30 - 20:30 3.00 STWHIP N DPRB 2,760.98 WEXIT DRESS WINDOW WITH 8.5"MILLING ASSEMBLY -100 RPM,3-4K TORQUE -500 GPM,820 PSI -P/U=89K,S/O=92K,ROT=90K -WORKED THRU WINDOW WITH PUMPS ON &ROTATION AND PUMPS OFF&NO ROTATION -NO DRAG THRU WINDOW -PUMPED HIGH VIS SUPER SWEEP,15% INCREASE IN CUTTINGS SEEN -OBTAINS SPRS 20:30 - 21:30 1.00 STWHIP N DPRB 2,760.98 WEXIT POOH WITH 8.5"MILLING ASSEMBLY FROM 2,781'MD TO 700'MD -MONITOR WELL FOR 10 MINUTES:WELL STATIC -MUD WEIGHT:9.3 PPG IN,9.3 PPG OUT -P/U=73K,S/O=73KAT 1,650'MD -MONITOR WELL VIA TRIP TANK:PROPER DISPLACEMENT Printed 7/27/2015 11:19:23AM North America-ALASKA-BP Page 9 cl $ Operation Summary Report Common Well Name S-44 AFE No Event Type:RE-ENTER-ONSHORE(RON) Start Date:7/9/2015 End Date X3-016P4-C:(7.869,557.00) Project:Prudhoe Bay Site:PB S Pad Rig Name/No.:PARKER 273 Spud Date/Time:3/2/1997 12:00:00AM Rig Release: Rig Contractor PARKER DRILLING CO. UWI:500292273500 Active datum:S-44A actual©81.43usft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (usft) 21:30 22:30 1.00 STWHIP N DPRB 2,760.98 WEXIT L/D MILLING ASSEMBLY FROM 700'MD TO SURFACE • -MONITOR WELL FOR 10 MINUTES BEFORE PULLING NON SHEARABLES ACROSS THE STACK:WELL STATIC -STAND BACK 5"HWDP -WINDOW MILL 7/8"UNDERGAUGE LOWER WATERMELON MILL 7/8" UNDERGAUGE i I UPPER WATERMELON MILL 9/16" UNDERGAUGE -DISCUSS WITH ODE 8 BP 1 SUPERINTENDANT PLAN FORWARD -DECISION TO SET A NEW EZSV, WHIPSTOCK,AND MILLA SECOND WINDOW • 22:30 - 23:00 0.50 STWHIP P WEXIT RIG SERVICE GREASE TOP DRIVE,ST-80,CROWN, —_—__- -_ I BLOCKS,CHECK TOP DRIVE OIL 23:00 - 00:00 1.00 STWHIP N DPRB 2,760.98 WEXIT FLUSH STACK AND FUNCTION BOPS PULL 9-1/8"WEAR RING -FLUSH BOP WITH BOP WASHING TOOL '-FUNCTION RAMS ,-BLOW DOWN CHOKE AND KILL LINES 00:30 0.50 STWHIP N DPRB DRAIN STACK 7/15/2015 00.00 I 2,760.98 ' WEXIT ,INSTALL 9-118"WEAR RING _ -CLEAN AND CLEAR RIG FLOOR 00:30 - 04:00 3.50 STWHIP N DPRB 2,760,98 WEXIT •WAIT ON E-LINE TO ARRIVE TO SET EZSV **SIMOPS** PERFORM DERRICK INSPECTION -OPEN HANDLER DOOR AND INSPECT 'SAVER SUB -BUILD STANDS OFFLINE CHANGE OUT SRL AT CROWN -CHANGE LIGHTS IN DERRICK -LOAD 6-1/2"COLLARS INTO PIPESHED 04:00 - 08:30 4.50 STWHIP N DPRB 2,760.98 WEXIT RIG UP HALLIBURTON E-LINE -MAKE UP EZSV TO E-LINE -RUN IN HOLE WITH EZSV/CCL POSITION EZSV© 2,682'E LINE MD -SET EZSV -POOH WITH WIRELINE -RIG DOWN WIRELINE EQUIPMENT -CLEAN AND CLEAR FLOOR 08:30 - 09:00 0.50 STWHIP N DPRB 2,760.98 WEXIT PRESSURE TEST EZSV TO 250 PSI LOW FOR 5 MIN,3000 PSI HIGH FOR 5 MIN EACH • -GOOD 250 PSI LOW TEST • -GOOD 3000 PSI HIGH TEST -TEST CHARTED AND ATTACHED 09:00 - 12:00 3.00 STWHIP ! N DPRB 2,760.98 WEXIT MAKE UP BAKER WHIPSTOCK ASSEMBLY FROM SURFACE TO 926'MD -MAKEUP 9-5/8"GEN II 3-STRING MILL AND LEAD MILL ASSEMBLY -CONFIRM ANCHOR SET FOR 20 KLBS SHEAR AND REMOVAL OF SHIPPING PIN -BKR REP AND SLB DD ON RIG FLOOR -ORIENT UBHO WITH WHIPSTOCK HIGHSIDE AND CONFIRM GYRO DATA TOOL PROPERLY ORIENTED -RIH 9 X 6 1/2"DRILL COLLARS -RIH WITH 18 JTS 5"HWDP Printed 7/27/2015 11:19:23AM North America-ALASKA-BP Page 10 g Q$ Operation Summary Report Common Well Name:S-44 AFE No Event Type:RE-ENTER-ONSHORE(RON) Start Date:7/9/2015 End Date: X3-016P4-C:(7,869,557.00) Project:Prudhoe Bay Site:PB S Pad Rig Name/No.:PARKER 273 Spud Date/Time:3/2/1997 12:00:00AM Rig Release: Rig Contractor:PARKER DRILLING CO. UWI:500292273500 Active datum:S-44A actual©81.43usft(above Mean Sea Level) Date I From-To I Hrs Task Code NPT NPT Depth Phase I Description of Operations (hr) (usft) 12:00 - 13:30 1.50 STWHIP N DPRB 2,760.98 WEXIT RIH WITH WHIPSTOCK/MILLING BHA#5 FROM 926'MD TO 2,654'MD -RIH WITH 4"DP FROM DERRICK -FILL PIPE EVERY 20 STANDS,500 GPM,700 PSI -MONITOR WELL VIA TRIP TANK:PROPER I DISPLACEMENT *SIMOPS** -SPOT&RIG UP SPERRY E-LINE FOR GYRO TO ORIENT WHIPSTOCK 2,760.98 WEXIT RIH GYRODATATO ORIENT WHIPSTOCK 13:30 14:30 1.00 STWHIP N � DPRB R/U GYRODATA RIH AND ORIENT WHIPSTOCK 283 DEG AZI AS PER SLB&GYRODATA -TAG EZSV AT 2,682'MD P/U=100K,S/O=104K POOH-WITH GYRO AND R/D ELINE 14:30 - 15:30 1.00 STWHIP N DPRB 2,760.98 WEXIT SET WHIPSTOCK -SLACKOFF 17K TO SET ANCHOR -PICKUP 10K OVER TO CONFIRM ANCHOR SET -SHEAR MILLING ASSMEBLY WITH SLACKING OFF 42K -P/U TO CONFIRM ASSEMBLY FREE,P/U= 97K -OBTAIN SPRS 15:30 - 22:30 7.00 STWHIP N DPRB 2,760.98 WEXIT KICKOFF S-44A SIDETRACK AND MILL WINDOW MILL WINDOW IN 9-5/8"CASING WITH 8-1/2" MILLING ASSEMBLY FROM 2,661'MD TO 2,678' MD I-DRILL 19'OF FORMATION TO 2,697'MD 575 GPM,915 PSI 90 RPM,3-5K TORQUE WOB:3-4K -P/U=104K,S/O=100K,ROT=101K -CEMENT OBSERVED BEHIND CASING -METAL CUTTINGS TO SURFACE OBSERVED -PUMP 25 BBL HIGH VIS SWEEP AT 2,669'MD, 15%RETURN IN CUTTINGS -PUMP 25 BBL HIGH VIS SUPER SWEEP AT 2,694'MD,20%RETURN IN CUTTINGS 1-WORK MILLS THRU WINDOW MULTIPLE TIMES TO ENSURE SMOOTH WINDOW -NO DRAG -OBTAIN SPRS TOP OF WINDOW:2,661'MD,2,661'TVD MIDDLE OF WINDOW:2,670'MD,2,670'TVD BOTTOM OF WINDOW:2,678'MD,2,678'TVD STWHIP N 22 30 - 23:00 0.50 DPRB I 2,760.98 WEXIT PERFORM FIT TEST -MUD WEIGHT:9.3 PPG,2,661'TVD -PUMP 2 BBLS AT 0.75 BPM,PRESSURE BROKE OVER AT 910 PSI,BLEED BACK 1.8 BBLS -ACHIEVE 15.78 PPG FIT -DISCUSS RESULTS WITH ODE -BLOW DOWN TEST EQUIPMENT -SEE ATTACHED DOCUMENTATION Printed 7/27/2015 11:19:23AM • North America-ALASKA-BP Page 11 QAat Operation Summary Report Common Well Name:S-44 AFE No Event Type:RE-ENTER-ONSHORE(RON) Start Date:7/9/2015 End Date: X3-016P4-C:(7,869,557.00) Project:Prudhoe Bay Site:PB S Pad Rig Name/No.:PARKER 273 Spud Date/Time:3/2/1997 12:00:00AM Rig Release: Rig Contractor:PARKER DRILLING CO. UWI:500292273500 Active datum:S-44A actual @81.43usft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (usft) 23:00 - 23:30 0.50 STWHIP P 2,760.98 WEXIT RIG SERVICE -GREASE WASHPIPE,BLOCKS,ROLLER ASSEMBLY,ST-80,CROWN CLUSTER 23:30 - 00:00 0.50 STWHIP N DPRB 2,760.98 WEXIT POOH ON ELEVATORS WITH MILLING ASSEMBLY FROM 2,630'MD TO 1,600'MD -MONITOR WELL FOR 10 MINUTES:WELL STATIC -MUD WEIGHT:9.3 PPG IN,9.3 PPG OUT P/U=104K,S/O=100KAT 2,630'MD MONITOR WELL VIA TRIP TANK:PROPER DISPLACEMENT 7/16/2015 00:00 - 00:30 0.50 STWHIP N DPRB 2,760.98 WEXIT POOH ON ELEVATORS WITH MILLING ASSEMBLY FROM 1,600'MD TO 926'MD -MUD WEIGHT:9.3 PPG IN,9.3 PPG OUT -P/U=92K,S/O=92K AT 1,600'MD -MONITOR WELL VIA TRIP TANK:PROPER DISPLACEMENT 00:30 - 02:30 2.00 STWHIP N DPRB 2,760.98 WEXIT L/D MILLING BHA FROM 926'MD TO SURFACE -MONITOR WELL FOR 10 MINUTES BEFORE PULLING NON SHEARABLES ACROSS STACK WELL STATIC -L/D 6"DRILL COLLARS -STAND BACK 5"HWDP -WINDOW MILL 3/8"UNDERGAUGE -MIDDLE MILL 1/4"UNDERGAUGE -LOWER WATERMELON MILL 1/16" UNDERGAUGE -UPPER WATERMELON MILL 1/16" UNDERGAUGE -CLEAN AND CLEAR RIG FLOOR 02:30 - 03:30 1.00 STWHIP P WEXIT FLUSH STACK AND FUNCTION BOPS -PULL 10"WEAR RING -FLUSH BOP WITH BOP WASHING TOOL -FUNCTION BOPS -BLOW DOWN CHOKE AND KILL LINES -DRAIN STACK -INSTALL 10"WEAR RING 03:30 - 07:00 3.50 STWHIP P WEXIT MAKE UP 8.5"MOTOR DRILLING BHA FROM SURFACE TO 863'MD -M/U AS PER SLB DD/MWD,GYRODATA -P/U=70K,S/O=70K -8-1/2"PDC,6-3/4"PDM 1.5 DEG,8-3/8 NM STAB,NM XO.GYROPULSE 675 GWD, TELESCOPE 675 MWD,PERISCOPE 675 LWD,NM XO,8-3/8"NM STABILIZER,(3)FLEX COLLAR,FLOAT SUB,(15 JTS)5"HWDP, HYDRAULIC JARS,(5 JTS)5"HWDP,XO 07:00 - 08:00 1.00 STWHIP P WEXIT RIH ON ELEVATORS WITH 8.5"MOTOR DRILLING ASSEMBLY FROM 863'MD TO TOW AT 2,661'MD -MUD WEIGHT:9.3 PPG IN,9.3 PPG OUT -SHALLOW HOLE TEST MWD AND GYRO TOOLS AT 1,800'MD,450 GPM,950 PSI,GOOD TEST -MONITOR WELL VIA TRIP TANK:PROPER DISPLACEMENT -ORIENT MOTOR TO EXIT WINDOW -OBTAIN SPRS Printed 7/27/2015 11:19:23AM TREE== — WELLHEAD= FMC S-44 SAFETY NOTES: 'ACTUATOR= L 1 __B 67' . __.___ BF.ELEV= 37.162 .1 KOP= 4457 20'CONDUCTOR, -{ 110' Max Angle= 104°@ 10550 Datum MD= WA 91.5#,H-40, Datum ND= 8800'SS D=19.124' 2687 H9-5/8"EZSV(07/15/15) 9-5/8"WHPSTOCK(07/15/15) -I 2661' /1;1"1-1=2 ;i1111. 9-5/8"WI-* TOCK(07/1415) -{ 2743' 2764' -9-5/8"EZSV(07/13/15) 7'CSG STUB(07/12/15) - 2910' 9-5/8"CSG,40#,L-80 BUTT,D=8.835' H 3130' 1--A GAS LFT M 4NDRaS ST M? ND DEV TYPE VLV ..ATC-PORT CATE 5 3437 3437 0 KBG-2 DMY BK 0 10/29/14 4-1/2"TBG STUB(06/06/15) -j 3220' IF 4 5685 5585 29 KBG-2 DMY BK 0 10/29/14 ESTM4 i Eli TOP OF CEI/EMT(06/04/15) H 7703' 3 7299 6981 31 KBG-2 OMY BK 0 10/29/14 Ng '2 8364 7900 31 KBG-2 OMY BK 0 10/29/14 Minimum ID =8.835" '1 9016 8465 32 KBG-2 EMPTY - 06/03/15 9-518" CASING STA'S#1&#2 CMENTEC( }4115) 9084' H4-1/2'FES X NP,TD=3.813" 4-1/2"FBS CMT RTTANER(05/13/15) --1 9169' 44 9105' r x 4-112'BKR S-3 PKR,D=3.875" 4-1/2"1BG,12.6#,13CR-80 VA TOP, - 9191' 9128' H4-1/2"FES X Nom,D=3.813' .0152 bpf,D=3.958" 17474 4-1/2"TBG STUB(JEWELRY LOG 09/03/06) -{ 9195' / 9225' H4-112'FES X NV,D=3.813' 1 eV t 4-1/2"TBG,12.6#,L-80 BM,.0152 bpf,ID=3.958' - 9245' NIA 9200' H7"X 4-1/2"UMQUE OVERSHOT 9236' _I r x 4-1/2"BKR S-3 PKR,D=3.875" _ 'I I MLLOUT (S-44L1)WINDOW 9506'-9518' 7'RA TAG -I 9298' FISH-48'OF TBG TAL @ Li WINDOW 9496' „e%)".ere ' ` 9528• -15-5/8”TEBACK SLEEVE,D=5.25' (TAGGED 09(03(06) L9632' H5"X 4-1/2"XO,D=3.958' 7'RA TAG 9505' 4,4 f#0:1gre. IT' 1' �/-1 1. FISH-28'BKR WHIPSTOCK(ON M-PKR) -I 9514' d'IO /eV►l it " 61 Mgt etce •.t, . 7"X 4-1/2"BKR ML PKR D=3.875' I- 9542' ■ M� 03 4-1/2"TBG,12.6#,L-80 NSCT,.0152 bpf,D=3.958" 9576' v 4-1/2"LNR,12.6#,L40 NSCT, --I 12373' 4ci `i .0152bpf,D=3.958 7"X 4-1/2'11W S-6 PKR w ITEBK SLV,D=3.868" H 9939' r X 4-1/2"TM/DTH-S HYD LNR HGR,ID=3.925" H 9951' ,601 ` 9560' -14-1/2"HES X NF,D=3.813" 7"CSG,26#,L-80 BTC/STL,D=6.276" N 10204' \ 9557' -4-1/2"HES XN Imo,D=3.725" RiFFORATION SUMMARY 9576' H4-1/2"WLF3i,D=3.958" REF LOG: ANGLE AT TOP PERF:N/A N. Note:Refer to Production DB for historical pert data • 10.76' H4-1/2-FES CHuENTE31 SIZE SFF NTR'VAL Opn/Sqz SHOT Sl]ZVeit 10878' -HTC EXT CSG PKR,D=3.885" 4-1/2" SLOT'10927-1S-44 281 S 05/02/97 06/02/15 �I �r`r %� 13128' -{ F81D S�4 LI I�I,,I I I `hJ'�G��s. � 4-1/2' SLOT '9532-10306 S 05/02/97 06/02/15 a �: I+I,I��R�I ` ,' 4-1/2" SLOT'10392-11502 S 05/02/97 06/02/15 'ice . , 4-1/2" SLOT'11584-12350 S 05/02/97 06/02/15 4-1/2"SOLID/SLID LNR, H 13130' *BE .OW CEMENT RETAINER @ 9159'(05/13/15) 12.6#,L-80 NSCT,.0152 bpf,D=3.958" DATE REV BY COMM1aYTS DATE REV BY COMMENTS PRUEJFDE BAY UNTr 05/03/97 N18E ORIGINAL COMPLETION 06/06/15 CJS/PJC JET CUT TUBING WELL S-44/L1 06/27/06 N7E5 RWO 06/16/15 JU PJC BASE FLA NIGE(2013)CORRECTION PERMIT No: 197006011970070 05/13/15 GTW/PJC C 8tENT RETAINER 07/13/15 PJC CUT/PULL TBG&7"CSG-RIG AR Pb: 50-029-22735-00(60) 06/02/15 TA/PJC P&A 07/14/15 PJC SET 1ST FS7V& WI-FSTOC K(RIG) SEC 35,T12N,R12E,1038'FN_.&778'FWL 06/03/15 PJC GLV PULLED#1(E314'WY) 07/15/15 PJC SET 2M)EZSV&WHPSTOC K(RIG) 06/04/15 DL.H'PJC CHAT CAP BP Exploration(Alaska) OF T" Alaska Oil and Gas hw\�\\�/y,�s THE STATE '-s ofALASIc:A Conservation Commission - 333 West Seventh Avenue OF a GOVERNOR BILL WALKER Anchorage, Alaska 99501-3572 Main: 907.279.1433 ALAS Fax. 907.276.7542 y,'•"t www.aogcc.alaska.gov Ken Allen C.C10 ) r Engineering Team Leader 1 q ' 00 BP Exploration (Alaska), Inc. P.O. Box 196612 Anchorage, AK 99519-6612 Re: Prudhoe Bay Field, Prudhoe Bay Oil Pool, PBU S-44L1 Sundry Number: 315-073 Dear Mr. Allen: Enclosed is the approved application for sundry approval relating to the above referenced well. Please note the conditions of approval set out in the enclosed form. As provided in AS 31.05.080, within 20 days after written notice of this decision, or such further time as the AOGCC grants for good cause shown, a person affected by it may file with the AOGCC an application for reconsideration. A request for reconsideration is considered timely if it is received by 4:30 PM on the 23rd day following the date of this letter, or the next working day if the 23rd day falls on a holiday or weekend. Sincerely, Cat y P. oerster Chair DATED this /e1ay of February, 2015 Encl. STATE OF ALASKA RECEIVED ALASI.,,OIL AND GAS CONSERVATION COMMILolON 201 FEB 1 1 APPLICATION FOR SUNDRY APPROVAL FPB 1 201(8 1.5 20 AAC 25.280 AOGCC 1. Type of Request: ❑Abandon ®Plug for Redrill • ❑Perforate New Pool 0 Repair Well 0 Change Approved Program ❑Suspend 0 Plug Perforations 0 Perforate 0 Pull Tubing 0 Time Extension ❑Operations Shutdown 0 Re-Enter Suspended Well 0 Stimulate 0 Alter Casing 0 Other 2. Operator Name 4 Current Well Class 5. Permit To Drill Number BP Exploration(Alaska) Inc. 197-007 ❑ ploratory 0 Stratigraphic 3. Address' 6. API Number: Development 0 Service P.O. Box 196612,Anchorage,Alaska 99519-6612 ,6,)z !.= /C 50.029-22735-60-00 • 7. If perforating: 8. Well Name and umber: What Regulation or Conservation Order governs well spacing in this pool? PBU S-44L1 Will planned perforations require a Spacing Exception? ❑Yes No 9. Property Designatior 10.Field/Pool(s): ADL 028257&028258 ' Prudhoe Bay Field/Prudhoe Bay Oil Pool • 11. PRESENT WELL CONDITION SUMMARY Total Depth MD(ft): Total Depth TVD(ft): Effective Depth MD(ft). Effective Depth TVD(ft): Plugs(measured): Junk(measured) 12486' 8760' - 12486' 8760' None 9496'&9514' Casing Length Size MD TVD Burst Collapse Structural Conductor 80 20" 31'- 111' 31'- 111' 1490 470 Surface 3100' 9-5/8" 30'-3130' 30'-3130' 5750 3090 Intermediate 9477' 7" 29'-9506' 29'-8751' 7240 5410 Production Liner 2845' 4-1/2" 9528'- 12373' 8761'-8758' 8430 7500 Perforation Depth MD(ft): Perforation Depth ND(ft): Tubing Size: Tubing Grade' Tubing MD(ft): Slotted Liner:9532'- 12350' Slotted Liner:8762'-8758' 4-1/2", 12.6# 13Cr80/L-80 9245' Packers and SSSV Type: 7"x 4-1/2" Baker S-3 Packer; Packers and SSSV 9105'/8537'; 7"x 4-1/2"Baker S-3 Packer MD(ft)and ND(ft): 9236'/8624'; 12. Attachments: 13.Well Class after proposed work: - 0 Description Summary of Proposal 0 BOP Sketch 0 Detailed Operations Program 0 Exploratory 0 Stratigraphic 0 Development 0 Service 14. Estimated Date for 15. Well Status after proposed work. Commencing Operation. March 1,2015 0 Oil 0 WINJ 0 WDSPL 0 Plugged 16. Verbal Approval: Date 0 Gas 0 GINJ 0 GSTOR 0 Abandoned Commission Representative: 0 WAG 0 SPLUG 0 Suspended - 17. I hereby certify that the foregoing is true and correct to the best of my knowledge. Contact: Jacob Leemhuis,564-4989 Printed Name: Ken Allen Title: Engineering Team Leader Email: Jacob Leemhuis@bp.com Phone -4 Si nature: o e 564 366 Dto a Commission Use Only Conditions of approval: Notify Commission so that a representative may witness Sundry Number: 3 VS— 07 3 ❑Plug Integrity ItK3OP Test 0 Mechanical Integrity Test 0 Location Clearance Other 130P te51` to 35Ccp5r (Art,P5P 15 ZZ. B., Ps. i kir--) u14r 11-t ✓tnf'Cr' I-C-S1" tc 2500p5; . Spacing Exception Required? 0 Yes "No Subsequent Form Required: /G — 4 O 7 APPROVED BY Approved By: ���P.).€4,4,......, COMMISSIONER THE COMMISSION Date* Z.-/IF- / 5-- Form Form 10-403 Revised 1 2012 i jl2 d for months from the date of approval Submit In Duplicate V TL 2/! ��lS orziaoliaN /1' _p /n�.2 lR�S �t� z /�./S' tBDMS FFR 7 1 7nu . yam -, bP GPj,,mu , nV S-44L1 Sundry Application Well Type: Producer Current Status: The well is currently shut-in. Request: Approval is requested for the P&A of Prudhoe Bay well S-44 to sidetrack and complete S-44A. MIT-IA Passed to 3,500 psi (10/29/2014) PPPOT-T Passed to 5,000 psi (10/18/2014) PPPOT-IC Passed to 3,500 psi (10/18/2014) Well History: S-44 is currently an Ivishak producer that has a tubing tail fish near the S-44L1 window (been in the hole since 2006 which was mostly a product of the RWO), and a Baker whipstock fish that is located above the 7" x 4-1/2" packer at 9,562' MD (been in hole since 2003). With the exception of the two fish in the hole, the upper completion appears to be in good shape. Scope of Work: The sidetrack plan for the S-44A well includes the following: pre-rig operations will include setting a cement retainer and P&A laterals with 122 bbls of cement. Drift and tag top of cement, pull DGLV from Station 1 at 9,016' MD and circulate a cement plug into TBG x IA (-38 bbls). Drift and tag cement, perform CMIT-IA to 3,500 psi, and jet cut at 3,200' MD. Perform another CMIT-IA to 3,500 psi, install dry hole tree and set TWC. The rig will then move in and pull 4-1/2" tubing, run a clean out run, jet cut 7" casing at 3,000' MD and pull 7" to surface. Once the casing has been pulled, set an EZSV bridge plug in preparation to set the whipstock to exit the casing at -2,747' MD. A 7" intermediate casing will be set at the top of the Kuparuk River and 6-1/8" production hole will be drilled in the Kuparuk. Run 4.5" cementless/sliding sleeve production liner assembly with liner top packer. Run 4.5" tubing tied into top of production liner. MASP: 2,680 psi Estimated Start Date: March 1, 2015 / G� /- 6 I CO4 Cur. /�c IA-ell /'bU vGta� /00 80,P vs.., Or VII L '7`C� Cvfi- ,„4 e ; - wq daft on //et".Cr''`o'0=- ,t'`c/y�f c� yc-Ie nc, lel ave 4o Ivo le ,`l G� 1P�Pf't (/f1'", 7 'Y well co � fi con p �Iekeof' trac eo� INe ' � S�14v/4/ GPak, for .yrDYtc/ f eCo vet, fro" 14,'f f rr7 ?it 6 I T'(e P004 ��0 J` Pre-rig prep work: Step Service Line Description of Work 1 E Set Cement Retainer 2 C P&A laterals with 122 bbls of cement 3 S D&T TOC. Pull DGLV from Sta 1 at 9016' MD. 4 F A/SL: CMIT-T 2500 psi. Circulate Cement Plug into TBG& IA-38 bbls of 15.8 Class G. TOC -8000' 5 F (length -1000' MD) 6 S D&T Cement. Drift for Jet Cut 7 F CMIT-IA to 3500 psi. 8 E Jet Cut TBG-3,200' MD. 9 F CMIT-IA to 3500 psi. 10 D Bleed T/I/O to 0 psi Proposed Drilling Rig Operations: 1. MIRU Parker 273. 2. Test TWC from below to 3,500 psi for 30 minutes. 3. Nipple down tree. Nipple up and test BOPE to 3,500 psi. 4. Pull TWC with lubricator. 5. RU hard lines to BOP. Circulate out diesel freeze protection through choke to tiger tank with clean 8.5 ppg seawater. 6. RU and pull the 4-1/2" tubing from the pre-rig jet cut. 7. RU E-Line and cut 7" casing at -3,000' MD. 8. RU and pull 7" casing from rig jet cut. 9. RIH with 9-5/8" clean out assemble down to the top of casing stub. 10. RU E-line w/GR/CCL log and set EZSV at-2,768 MD and pressure test to 3,500 psi for 30 min. Chart test. 11. PU 9-5/8" whipstock, bottom trip anchor and 8.5" window milling assembly (to include full gauge string mills). RIH to the top of the EZSV. Orient and set the whipstock. 12. Swap the well over to 9.0 ppg fresh water LSND milling fluid. End of Sundry: Start of Permit to Drill 13. Change 9-5/8" pack-off. Pressure test to 3,500 psi. 14. Mill window in the 9-5/8" casing plus 20' of formation. 15. Perform LOT. POH for drilling BHA. 16. MU 8-1/2" drilling BHA, GR/RES/NEU/DEN/PWD, UBHO (Gyro), and RIH. Kick off and drill 8-1/2" intermediate interval. 17. Drill 8-1/2" intermediate interval to section TD in TKC4 at-10,083' MD. Weight up drilling fluid using spike fluid maintaining the following density ranges: • KOP -5,260' TVDss: 9.2 -9.3 ppg • 5,260' TVDss-TD: 10.6 ppg 18. At TKC4, CBU until hole is clean (minimum 2x) and POH on elevators to the ghost reamer depth. 19. RBIH, circulate well clean, and POH on elevators. 20. Change upper VBR pipe rams to 7" casing rams and test to 250 psi low/ 3,500 psi high. 21. Run and cement 7", 26#, L-80, VAM TOP casing to TD. Top of cement will be at 3,247' MD. 22. Pressure test the 7" casing to 250 psi low/3,500 psi high for 5 minutes low/ 30 minutes 23. Change upper 7" casing rams to 2-7/8" x 5-1/2" VBR pipe rams and test to 250 psi low/ 3,500 psi minutes high when the plug bumps. 24. Install the 7" pack-off through the stack and test to 250 psi low/ 5,000 psi high for 30 minutes. 25. Freeze protect the 9-5/8" x 7" annulus, once the tail cement has reached compressive strength. 26. MU 6-%8" drilling BHA with Insert bit, bent housing motor, and GR/RES/NEU/DEN. RIH to the landing collar and test the casing to 3,500 psi for 30 minutes. 27. Displace the well to 9.9 - 10.1 ppg Flo-Pro NT fluid prior to fully drilling out shoe track. 28. Drill 20' of new formation and perform a FIT. 29. Drill 6-1/8" hole to TD at 12,107' MD. 30. Circulate bottom ups and condition the hole as necessary. Backream to the 7" shoe, MAD passing as required. 31. Trip in hole to TD and circulate/condition the hole as necessary until shakers clean up. POH on elevators. 32. MU and run 4-W 13.5# 13CR VT sliding sleeve/swell packer liner to TD. 33. Drop a ball to land the ball on the ball seat in the toe of the well. 34. When the ball lands, set liner hanger and liner top packer. Prior to pulling the running tool, perform a pressure test on the liner top packer by testing the 7" casing x drill pipe annulus to 250 psi low/ 3,500psi high for 5 min low/30 min high. 35. Pull liner running tool above liner top. Displace well to clean 10.3 ppg Brine. 36. POH, L/D the liner running tool. 37. R/U and run a 4-W, 13.5#, 13CR, VAMTOP tubing completion with GLMS. Space out and land the tubing with tubing tail inserted into the liner tieback sleeve. 38. Make up tubing hanger per Cameron Rep. Land the tubing hanger, and run in lock down screws. 39. Reverse circulate filtered 10 ppg brine and corrosion inhibitor into the tubing x casing annulus. 40. Drop ball/rod and set packer and individually test the tubing and annulus to 3,500 psi for 30 minutes. Record each test. 41. Bleed tubing pressure to 2,000 psi. Pressure test the IA to 250 psi low/3,500 psi high for 5 minutes low/ 5 minutes high. 42. Hold pressure on the IA and bleed tubing pressure to zero, shearing the DCK shear valve. Pump both ways to confirm circulation ability. 43. With landing joint still rigged up, reverse circulate diesel freeze protect using rig injection pump. 44. Allow diesel to U-tube, drain stack, and rig down landing joint. Monitor well for 1 hour to confirm well is dead. 45. Install TWC and test from above to 250 psi low/3,500 psi high for 5 minutes each and from below to 250 psi low/3,500 psi high for 5 minutes low/30 minutes high. 46. Nipple down the BOPE. Nipple up the adaptor flange and double master valves and test to 5,000 psi with diesel. 47. Ensure Heet® is left on top of the TWC and only diesel (no water) is left in the tree. 48. Install all annulus valves and secure the well. Ensure T/IA/OA all have two barriers in place. 49. RDMO. Planned Post-Rig Operations: 1. Pull BPV, Pull Ball, Rod and RHC Plug with slickline. 2. Pull shear valve and dummies, install GLVs. 3. Open sliding sleeves as required by NWD PE. Flow back and clean up the well. 4. Install flow lines and well house. 5. Produce for—1 month to determine pre-frac PI. 6. Post pre-frac PI determination, conduct fracture stimulation. Drilling Engineer: Jacob Leemhuis (907) 564-4989 Production Engineer: Alex Youngmun (907) 564-4864 Geologist: Roger Sels (907) 564-5215 TREE= 4-1/16"CM/ SAF NOTES: WELL ANGLE>70 DEG @ 9586'. WELLHEAD= FMC ***t -1 IS AN OH SLT'D LNR W/O PKR OR HGR(NOT ACTUATOR= BAKER C S-44 WL ACCESSIBLE).***FISH-BAKER WHIPSTOCK ON KB.ELEV= 67' TOP OF ML PKR @ 9514'(UNRETRIEVALBE BY RIG BF.ELEV= 35.7' , I AFTER DRILLING S-44L1)***4-1/2"CHROME TBG*** KOP= 4452' 20"CONDUCTOR H 110' _ ._____.........„....„....i..,Max Angle= 104°@ 10550' /� 2114' -I4-1/2"HES X NIP,ID=3.813" Datum MD= 9-5/8"HES - 1763' If/ GAS LIFT MANDRELS Datum ND= 8800'SS CEMENTER , ST MD ND DEV TYPE VLV LATCI- PORT DATE k 5 3437 3437 0 KBG-2 DOME BK 12 05/25/11 9-5/8"CSG,40#,L-80 BUTT,ID=8.835" - 3130' 4 5685 5585 29 KBG-2 DOME BK 16 05/25/11 3 7299 6891 31 KBG-2 DOME BK 16 05/25/11 Minimum ID =3.725" @ 9567" 2 8364 7900 31 KBG-2 SO BK 24 05/25/11 4-1/2" HES XN NIPPLE 1 9016 8465 32 KBG-2 DMY BK 0 03/20/11 1 9084' -I4-1/2"HES X NIP,ID=3.813" 9105' _I 7"x 4-1/2"BKR S-3 PKR,ID=3.875" 4-1/2"TBG,12.6#,13CR-80 VAM TOP, -1_2:121._[..,.......... \---. 9128' H4-1/2"HES X NIP,ID=3.813" .0152 bpf, ID=3.958" 0„....---1 9200' H 7"X 4-1/2"UNIQUE OVERSHOT 4-1/2"TBG STUB(JEWELRY LOG 09/03/06) 9195' i 1 9225' H4-1/2"HES X NIP, ID=3.813" x' 9236' _17"x 4-1/2"BKR S-3 PKR,ID=3.875" 4-1/2"TBG,12.6#,L-80 IBM,.0152 bpf,ID=3.958" --i 9245' 9528' -5-5/8"TIEBACK SLEEVE,ID=5.25" 7"RA TAG - 9298' I--. 9532' -15"X 4-1/2"XO,ID=3.958" FISH-48'OF TBG TAIL @ L1 WINDOW 9496' (TAGGED 09/03/06) MILLOUT WINDOW(S-44L1)9506'-9518' 7"RA TAG - 9505' ------ FISH-28'BKR WHIPSTOCK(ON ML PKR) -I 9514' _- -- 7"X 4-1/2"BKR ML PKR,ID=3.875" 1-1 9542' 17'. • �1 - S-44L1 -_--- 9560' -14-1/2"HES X NIP,ID 3.8 I I 1 4-1/2"TBG,12.6#,L-80 NSCT,.0152 bpf, ID=3.958" - 9576' I---/ 9567' I-14-112"HES XN NIP,ID=3.725" 9576' H4-1/2"WLEG, ID=3.958" 6"TM/TIEBACK SLV,ID=?" -I 9939' I-- 7"X 4-1/2"TIW S-6 PKR, ID=3.868" - 9945' 4-1/2"LNR,12.6#,L-80 NSCT,.0152bpf,ID=3.958" -I 12373' I 7"X 4-1/2"TM/DTH-S HYD LNR HGR,ID=3.925" - 9951' I 7"CSG,26#,L-80 STL, .0383 bpf,ID=6.276" -I 10204' I--4 10876' -14-1/2"HES CEMENTER PERFORATION SUMMARY 10878' -I CTC EXT CSG PKR,ID=3.885" REF LOG: ANGLE AT TOP PERF: 65°@ 9532' '� Note:Refer to Production DB for historical perf data 13128' -PBTD SIZE SPF ZONE INTERVAL Opn/Sqz DATE 4-1/2" SLTD SAG 09532-10306 C 05/02/97 4-1/2" SLTD " 10392-11502 C 05/02/97 4-1/2"SOLID LNR, 12.6#,L-80 IBP, -I 10927' \\S-44 \` 4-1/2" SLTD " 11584-12350 C 05/02/97 - i 4-1/2" SLTD Z4 10927-13128 C 05/02/97 .0152 bpf, ID=3.958" 4-1/2"SLOTTED LNR, 12.64,L-80 NSCT,.0152 bpf,ID=3.958" 13130' DATE REV BY COMMENTS DATE REV BY COMMENTS PRUDHOE BAY UNIT 05/03/97 N18E ORIGINAL COMPLETION 04/03/08 DHO/PJC DRLG DRAFT CORRECTIONS WELL: S-44 06/27/06 N7ES RWO 05/31/10 SEW/PJC GLV CIO(05/10/10) PERMIT No:'1970070 09/04/06 RRD/PJC FISH-48'TBG TAIL @ 9496 03/27/11 JM/PJC GLV C/O(3/20/11) API No: 50-029-22735-60 12/24/06 JPK/PAG GLV C/O(08/11/06)-CORRECT 06/01/11 SET/PJC GLV C/O(05/25/11) SEC 35,T12N,R12E, 1038'FNL&778'FWL 1 05/01/07 JRP/PJC GLV C/O 10/03/07 DAV/TLH GLV C!O BP Exploration(Alaska) TREE= 4-1/16"CNV /� /� _ WELLHEAD= FMC A _4_TPK. q,CTUATOR= BAKER C V` "': .1 IS AN OH SLID LNR W/O PKR OR MGR(NOT WL ACCESSIBLE).'"'ASH-BAKER WHIPSTOCK ON KB.B.EV= 67' P mposed P&A TOP OF ML PKR @ 9514'(UNRErRIEVALBE BY RIG BF.8 EV= 35.7I AFTER DRILLING S-44L11'"'4-1/2°CHROME TBG"- KOP= 4452' 20'CONDUCTOR H 110' ij Max Angle= 104"@ 10550' /� I 2114' H4-1/2"FESX NP,D=3.813" Datum MD= 9-518°FES -I 1763' / GAS LFT MANDRELS Datum TVD= 8800 SS CEMENTER ' ST MD TVD DEV 1Y FE VLV .ATCF PORT DATE 9-5/8"CSG,a0#,L-80 BUTT,ID-8.835 3130' 5 3437 3437 0 ICBG-2 DOME BK 12 05/25/11 Ell 4 5685 5585 29 KBG-2 DOME BK 16 05/25/11 TOC at3,247'MD (3,179'TVDss;' 3 7299 6891 31 KBG-2 DOME BK 16 05/25/11 235.75 b5 % excess. 3 bb is - 2 8364 7900 31 KBG-2 SO BK 24 05/25/11 in shoe track, tagged 6 bbls high. Tota 1 S lu rry Volume = 245 bb is 1 9016 8465 32 KBG-2 DMY BK 0 03/20/11 TOC P11g = 8,348'MD (7,820'TVDss) ------ 11, • 1 • 9084. -I4-I2'FES XMP,D=3.813- Last centralizer on joint#165 = -3,280'MD • DPZ1 SB-NA 4,887'TVDss (4,976'MD) , • 9105' _ rx4-1/2"BKR S-3PKR,D=3.875" Base,bBF 5,295'TVDss (5,432'MD) Squeeze Packer= -9,150'MD ,: 9128' H4 trz•FESX P,D=3.813• DPZ2 TKUP 6,580'TVDss (6,912'MD) -1,--- 9200' -17•X4 112"UNtlCal1EOVERSHOT Base/rMLV 6,860'TVDss (7,236'MD) ' ' 9225' 1-I4-1/2"FES X NP,D=3.813• DPZ3 TSGR 8,679'TVDss (9,495'MD' Base 8,901'TVDss (13,150'MD) I a — 9236' ]_ 7•x 4-1/2"BKR S-3 PKR,D=3.875' 4-1/2'TBG,12.6#,L-80 BM,.0152 bpf,D=3.958' H 9246' -----___ 9528' 1-15-5/8'TACK SLEEVE,D=5.25" IT RA TAG I-1 9288' .--. 9532' 1-15'X4-1/2"XO,D=3.958' FISH-48'OF TBG TAL @ L1 V1IPDOW H 9496' (TAGGED 09103/06) I ML LOUT WSIDOW(S-44L1)9506'-9518' I I7'RA TAG H 9606' ".y FISH-28'BKR WHPSTOCK(ON ML PKR) H 9514' >< r X 4-1/2"BKR PAL.PKR,ID-3.875" — 9642' Cem entVoLm es I ■ ( a 9560' ]- 4-1R"FES X NP,D=3.813' P11g#2 = -3b1s Pllg#2 = -300.7.7 bbh I ,\ 4-1/2"TBG,12.6#,L-80 NSCT,.0152 bpf,D=3.958" H 9576' J � \ 9567' 4 t/2"FSS XN NP D=3.725' ---- 9576' J-14-1/2"WLEG,D=3.958" 6"TMI TACK SLV,D=?' -1--- 9939' 1----iJ 4-1/2"LNR,12.6ii,L-80 I�CT,.0152bpf,D=3.958" -i 12373' 7"X 4-1/2"TM/S-6 PKR,D=3.868• H 9946' 7"X 4-1/2'TW DTH-S HYD LNR HGR,D=3.925' H 9951' ' L 1--- 7" 7"CSG,26#,L-80 STL,.0383 bpf,D=6.276" -1 10204'-1---i L. 10876' H4-1/2"FES CEMENTER PERFORATION SUMARY 10878' H CTC EXT CSG PKR,13=3.885' REF LOG: ANGLE AT TOP PERF: 65°@ 9532' GL Note:Refer to Production DB for historical pert data SIZE SPF ZONE MBRVAL Opn/Sqz DATE 13128' HFBTD 4-1/2" SLID SAG 09532-10306 C 05/02/97 �' 4-1/2" SLID 10392-11502 C 05/02/97 _ . 4-1/2" SLID " 11584-12350 C 05/02/97 4-1/2"SOLD LM 12.6#,L-80 BP, -I 1092T ,+ 4-1/2" SLID Z4 10927-13128 C 05/02/97 .0152 bpf,D=3.958" I4-1/2'SLOTTED IN12.6#,L-80 NSCT,.0152 bpi, =3.958" ` F, D 13130' DATE REV BY CONSENTS DATE REV BY CONSENTS FRUD-IOE BAY UNIT 05/03/97 N18E ORIGINAL COMPLETION 04/03/08 131-10/PJC DRLG DRAFT CORRECTIONS WELL: S-44 06/27/06 N7E5 FMO 05/31/10 SEW/PJC GLV CIO(05/10/10) FERMIT No:'1970070 09/04/06 RRDIPJC FSH-48'TBG TAL @ 9496 03/27/11 JM PJC GLV C/O(3/20/11) AR Nb: 50-029-22735-60 12/24/06 JRC/PAG GLV C/O(08/11/06)-COf I 06/01/11 SET/PJC GLV GO(05/25/11) SEC 35,T12N,R12E,1038'FPL&778'FWL 05/01/07 JRPIPJC GLV CIO 09/29/14 JCL Proposed PM for S-44A I 10/03/07 DAV/TLH GLV C/O BP Exploration(Alaska) TREE= wELLREA.b= FMC PROPOS`0 S-44A SAI — IOTES: WELL ANGLE>70"r '. ACTUATOR= _ OKB.ELEV= 67' BF.REV= 35.7' "COND, -i ^-110' I--- a p 11763' H9-5/8"HES CEMENTER KOP= 4452' _'#, Max Angle= _"@ ID= - ' , 2,000' H4-1/2"HES X NP,D=3.813" Datum MD= Datum1VD= 8800'SS 9-5/8'WHPSTOCK(_/_/_) --I -2747' l` WINDOW WDOW(S-44A) -2747'--2757' 9-5/8"CSG,40#,L-80 BTRS,D=8.835" H -2747' l GAS LFT MANDRELS ST MD TVD DEV TYPE VLV rATCF PORT DATE E 5 Minimum ID =3.725" @ 4 4-1/2" HES XN NIPPLE 3 2 TOP OF CEMENT(_/ /___,) H 3,247' 1 i i ' I VI 9,193' H4-1l2"HES XNP,D=3.813' 14-1/2"NDPG Sapphire GaugeH 9,618' I A 9,783' H 7'X 4-1/2"FES TNT PKR,D=3.856" J ki:: I il 9,852' H4-1/2"HES X NP,D=3.813" I I ' r 9,925' H4-1/2"HES X NP,D=3.813" I I (TOP OF 4-1/2'LINER H9,933' 4-1/2"TBG,12.6#,13CR-85 VAM TOP, 9938' 9,938' H4-112"WL ,D=3.958" .0152 bpf,D=3.958f-I 4. 7"26#,L-8O VTHC =Surface to 9,783'MD I 7"CSG,26#,L-80 VAM TOP HC,.0383 bpf,0=6.276' H 10,083' I 7"26#,13C r-80 VT = -9,783'to 10,083'M D 1 I I 4-1/2"Sw ell Packers,13.5#,13Cr-85 H ' /i l I I I 14-1/2"Frac Rated Skiing Sleeve H I I 1 I I Abi 3-1/2'Anchor Sw el Packer H ,...10 4-1/2"LNR 12.6#,13CR-86 JFE BEAR H 12,10T 1� .0152 bpf,ID=3.920 DATE REV BY COMMENTS DATE REV BY COMFITS PRUDHOE BAY UNIT 05/03/97 10118E ORIGINAL COMPLETION WELL: S-44A 06/27/06 N7ES RWO PERMT No: 10/14/14 JMD BUILT FROPOSED API No: 50-029-22735-_ 02/05/15 JCL REDESIGNED NTERMEDIATE SEC 35,T12N,R12E,1038'FNL 8 778'FWL BP Exploration(Alaska) ... PARKER 273 BOP STACK RAM TYPE BOP: DUTCH LOCK DOWN FLANGE SHAFFER LXT DOUBLE BOP 13 5/8"-5M 13 5/8"-5M STUDDED TOP 13 5/8"-5M FLANGED BOTTOM °` W/(2) 14" UL2 OPERATOR, UPPER CAVITY ° ° ANNULAR BOP: AND (2) 14" PSLK W/BSTR OPERATOR, r i trill ffi SHAFFER LXT 13 5/8"-5M LOWER CAVITY 13-5/8" 5M STUDDED TOP 0 13-5/8" 5M FLANGED BOTTOM 0 1 1 ' DRILLING CROSS: 13 5/8"-5M FLANGED TOP _I pp,, CO � 1 1 - 13 5/8"-5M FLANGED BOTTOM "31 (3.F .,(:) tl«_ w (2) 3 1/8"-5M SIDE OUTLETS OO�� ole: 1 . 00 _ E -Li II 7 •• 0000 -- •• 1 It 1 1 KILL LINE: OV � w .1 � �G�t7� 2-1/16" 5M FLEX HOSE = CX ( �1 n . 1 ,� b(� 2-1/16" 5M X 3-1/8" 5M D.S.A. •NIVA% °N,' 3-1/8" 5M FLANGED MANUAL GATE VALVE 3-1/8" 5M FLANGED HYDRAULIC GATE VALVE • p • �' 00 00 (le•w 0 0 7i ei P00 U I ' I CHOKE LINE: RAM TYPE BOP: 3-1/8" 5M FLANGED MANUAL GATE VALVE SHAFFER LXT SINGLE 13 5/8" 5M 3-1/8" 5M FLANGED HYDRAULIC GATE VALVE 13 5/8"-5M STUDDED TOP 13 5/8"- 5M FLANGED BOTTOM 3-1/8" 5M FLEX HOSE w/(2) 14" UL2 OPERATOR Sundry Application Plug for Re-drill Wells Work Flow This process is used to identify wells that are suspended for a very short time prior to being re-drilled. Those wells that are not re-drilled immediately are identified every 6 months and assigned a current status of"Suspended." Step Task Responsible 1 The initial reviewer will check to ensure that the "Plug for Redrill" box in the Patricia or Steve v/; upper left corner of Form 10-403 is checked. If the "Abandon" or "Suspend" boxes are also checked, cross out that erroneous entry and initial it on both copies of the Form 10-403 (AOGCC's and operator's copies). 2 If the "Abandon" box is checked in Box 15 (Well Status after proposed Patricia or Steve work) the initial reviewer will cross out that erroneous entry and initial it on / both copies of the Form 10-403 (AOGCC's and operator's copies). Instead, then y check the "Suspended" box and initial that change. Guy or Victoria The drilling engineers will serve as quality control for steps 1 and 2. (QC) 3 When the Stat Tech receives a Form 10-403 with a check in the "Plug for Jenni Redrill" box, she will enter the Typ_Work code "IPBRD" into the History tab for the well in RBDMS. This code automatically generates a comment in the well history that states"Intent: Plug for Redrill." 4 When the Stat Tech receives any Form 10-407, she will check the History tab Jenni in RBDMS for the "Intent: Plug for Redrill" code (IPBRD). If present and there is no evidence that a subsequent re-drill has been COMPLETED, the Stat Tech will assign a status of SUSPENDED to the well bore in RBDMS no matter what status is listed on the 10-407. The Stat Tech will also change the status on the 10-407 form to SUSPENDED, and date and initial this change. If the Stat Tech does not see the "Intent: Plug for Redrill" comment or code, she will enter the status listed on the Form 10-407 into RBDMS. 5 When the Form 10-407 for the redrill is received, the Stat Tech will change Jenni the original well's status from SUSPENDED to ABANDONED. 6 The first week of every January and July, the Stat Tech and one of the Jenni Geologists will check the "Well by Type Work Outstanding" user query in Patricia or Steve RBDMS to ensure that all of the Plug for Redrill wells have been handled properly. At this same time, they will also review the list of suspended wells for accuracy. XHVZE Pages NOT Scanned in this Well History File This page identifies those items that were not scanned during the initial scanning project. They are available in the .original file and viewable by direct inspection. File Number of Well Histor7 File PAGES TO DELETE RESCAN Complete n Color items - Pages: r~ GraYScale, halftones, pictures, graphs, charts - Pages: [] Poor Quality Original- Pages: [] Other - Pages: DIGITAL DATA [3 Diskettes, No. n Other, No/Type 'OVERSIZED [3 .Logs of various kinds D Other COMMENT8: D Scanned bye, ~red. D;r~t~ Nathan Lowell TO RE-SCAN Notes: D~, ~--~'-,~nn,*,el h~/' ~:~u~rtv Ui~,in~l 13~relha Nathan Lowell Date: ~ • ~ BP Exploration (Alaska) Inc. ~ Attn: We!! Inlegrity Coordinator, PRB-20 Post Office Box 196612 Anchorage, Alaska 99519-6612 June 25, 2009 ~ ~ Enclosed please find a spreadsheet with a list of wells from S-Pad that were treated with corrosion inhibitor in the surface casing by conductor annulus. The corrosion inhibitor is engineered to prevent water from entering the annular space and causing external corrosion that could result in a surface casing leak to atmosphere. The attached spreadsheet represents the well name, top of cement depth prior to filling and volumes of corrosion inhibitor used in each conductor. As per previous agreement with the AOGCC, this letter and spreadsheet serve as notification that the treatments took place and meet the requirements of form 10-404, Report of Sundry Operations. If you require any additional information, please contact me or my alternate, Anna Dube, at 659-5102. Sincerely, ~+"~' ~~i'1~yi~~~G~/ (c.vi ~ ~ t 4 .. L S/ L' ~ Torin Roschinger BPXA, Well Integrity Coordinator ~ BP Exploration (Alaska ) Inc. Surface Casing by Conductor Annulus Cement, Corrosion inhibitor, Sealant Top-off Report of Sundry Operetions (10-404) S-pad ~ Dffie 6/25/2009 Well Name PTD # Initial top of cement Vol. of cement um ed Final top of cement Cement top off date Corrosion inhibitor Corrosion inhibitod sealant date it bbis it na al 5-018 1952020 025 NA 025 NA 2.8 5/30/2009 S-02A 1941090 025 NA 025 NA 7.7 5/25/2009 5-03 1811900 1325 NA 1325 NA 92.66 5/20/2009 5-04 7830790 0 NA 0 NA o.9 5/25/2009 S-OSA 7951890 0 NA 0 NA 0.9 5/26/2009 S-O6 1821650 0 NA 0 NA 0.9 5/26/2009 S-07A 1920980 0 NA 0 NA 0.9 5/2&2009 5-088 2010520 0 NA 0 NA 0.85 5/27/2009 5-09 1821040 1.5 NA 1.5 NA 9.4 5/31/2009 S-t0A 1911230 0.5 NA 0.5 NA 3.4 5/31/2009 5-118 1990530 025 NA 025 NA 1.7 5/27I2009 S-12A 1851930 025 NA 025 NA 1.7 6/1/2009 5-13 1821350 8 NA 8 NA 55.3 6/i/2009 5-15 1840170 025 NA 025 NA 3 6/2/2009 S-17C 20200~0 025 NA 025 NA 2.8 6/1/2009 S-18A 2021630 0.5 NA 0.5 NA 3 6/2/2009 S-79 1861160 0.75 NA 0.75 NA 2.2 5/19/2009 S-20A 2070450 025 NA ~ 0.25 NA 1.3 5/19/2009 S-21 1900470 0.5 NA 0.5 NA 3.4 5/25/2009 S-22B 1970510 0.75 NA 0.75 NA 3 5/19/2009 5-23 1901270 025 NA 025 NA 1.7 5/25l2009 S-2aB 2031630 0.5 NA 0.5 NA 2.6 5/25/2009 S-25A 1982140 0.5 NA 0.5 NA 2.6 5/25/2009 S-26 1900580 0.75 NA 0.75 NA 3.4 5/26/2009 5-278 2031680 0.5 NA 0.5 NA 2.6 5/37/2009 S-28B 2030020 0.5 NA 0.5 NA 2.6 5/37/2009 S-29AL7 1960120 0 NA 0 NA 0.85 5/27/2009 5-30 1900660 0.5 NA 0.5 NA 5.1 5/31/2009 S-31A 1982200 0.5 NA 0.5 NA 3.4 5/26/2009 5-32 1901490 0.5 NA 0.5 NA 3.4 5/31/2009 5-33 1921020 0.5 NA 0.5 NA 4.3 5/26/2009 5-34 1921360 0.5 NA 0.5 NA 3.4 5/31/2009 5-35 1921480 0 NA 0 NA .e5in 5/31/2009 5-36 1921160 0.75 NA 0.75 NA 4.25 5/27/2009 S-s7 7920990 125 NA 1.25 NA 11.9 5/27/2009 S38 1921270 0.25 NA 0.25 NA 10,2 5/27/2009 S-ai 1960240 1.5 NA 1.5 NA 11.7 5/30/2009 5-42 1960540 0 NA 0 NA 0.9 5/30/2009 S-43 19~0530 0.5 NA 0.5 NA 1.7 5/28I2009 S44 1970070 025 NA 025 NA 1.7 5/28/2009 S-100 2000780 2 NA 2 NA 213 5/29/2009 S-101 2001150 1.25 NA 1.25 NA 11.9 5/29/2009 5-102L7 2031560 125 NA 125 NA 11.7 5/31YL009 S-103 2001680 7.5 NA 1.5 NA 11.9 5/18/2009 S-104 2001960 1.75 NA 1.75 NA 15.3 5/20/Z009 5-105 2001520 4 NA 4 NA 32.7 5/20/2009 5-106 2010120 16.25 NA 7625 NA 774.3 6/2/2009 5-107 2011130 2.25 NA 2.25 NA 28.9 5/1S/2009 5-108 2011000 3.5 NA 3.5 NA 40 5/30/2009 S-109 2022450 2 NA 2 NA 21.3 5/30/2009 S-110 2071290 11.75 NA 17.75 NA 98.6 5/30/2009 5-717 2050510 2 NA 2 NA 19.6 5l30/2009 S-112 2021350 0 NA 0 NA 0,5 5/30/2009 S-113 2021430 1.75 NA 1.75 NA 22.7 5/18/2009 S-t1aA 2021980 125 NA 125 NA 102 5/30/2009 S-115 2022300 2.5 NA 2.5 NA 272 5/29/2009 S-116 2031810 1.5 NA 1.5 NA 13.6 5/28/2009 S-117 2030120 1.5 NA 1.5 NA 15.3 5/29/2009 S-118 2032000 5 NA S NA 76.5 5/28/2009 S-119 2041620 1 NA 1 NA 52 5/30/2009 S-120 2031980 5.5 NA 5.5 NA 672 5/29/2009 5-121 2060410 4.5 NA 4.5 NA 53.8 5/28/2009 S-t22 2050810 3 NA 3 NA 2t3 5/29/2009 S-123 2041370 7.5 NA 1.5 NA 20.4 5/26/2009 S-124 2061360 1.75 NA 1.75 NA 11.9 5/26/2009 S-125 2070830 225 NA 225 NA 20.4 5/28/2009 S-126 20710970 125 NA 125 NA 15.3 6/1/2009 5200 1972390 125 NA 125 NA 14.5 5/28/2009 5-201 2001840 0 NA 0 NA 0,&5 6/19/2009 S-213A 2042130 2 NA 2 NA 13.6 5/29/2009 5-215 2021540 2 NA 2 NA 78.7 6/i/2009 5-216 2001970 4.75 NA 4.75 NA 51 5/29/2009 5-277 2070950 025 NA 025 NA 1.7 6/1/2009 Sd00 2070740 2 NA 2 NA 9.4 5/28/2009 5-401 2060780 16 NA 16 NA 99.5 6l2I2009 5-504 0 NA 0 NA 0.85 5/28/2009 • S-44LI (PTD #1970070) UNDER EWUATION for sustained casing press. TxIA Communication Page 1 of 1 Regg, James B (DOA) From: ~e'111Iv)/ò Î NSU, ADWWelllntegrity Engineer [NSUADWWelllntegrityEngineer@BP.com] Wednesday, September 05, 2007 3:30 PM GPB, GC2 Well pad Lead; GPB, GC2 OTL; GPB, Area Mgr West (GC2/WRD); Rossberg, R Steven; Engel, Harry R; NSU, ADW Well Operations Supervisor; GPB, Wells Opt Eng; GPB, Optimization Engr; GPB, Prod Controllers; Regg, James B (DOA); Maunder, Thomas E (DOA); Fleckenstein, Robert J (DOA); Ohms, Danielle H; NSU, ADW WL & Completion Supervisor Cc: NSU, ADW Well Integrity Engineer; Roschinger, Torin T. Subject: S-44L 1 (PTD #1970070) UNDER EVALUATION for sustained casing pressure - TxlA Communication Attachments: S-44L 1.pdf Sent: To: Hi all, Well S-44L 1 (PTD #1970070) has been found to have sustained casing pressure on the IA. The wellhead pressures were /2180/2160/11 psi on 09/03/07. A subsequent TIFL failed the following day on overnight build-up of IA pressure. The well has been reclassified as Under Evaluation and may be produced under a 28-day clock. The plan forward for this well is as follows: 1. D: TIFL - FAILED 2. APE: Eval DGL V design ~. 3. S: Set DGL Vs 4. D: Re-TIFL A wellbore schematic has been included for reference. «S-44L 1.pdf» Please call with any questions or concerns. Thank you, Jlnna (])u6e æ f£. Well Integrity Coordinator GPB Wells Group Phone: (907) 659--5102 Pager: (907) 659-5100 x1154 scANNED SEP 2 7 2007 9/25/2007 TREE = W8..LHEA D = ACTUATOR = KB. 8..EV = SF. 8..EV = KOP= Max Angle = Datum MD = DatumND= 4-1/16" CWV FMC BAKER 66.2' 35.7' 4452' 104 @ 10550' I HES CMTR H 8800'8S 9-518" CSG, 40#, L-80, 10 = 8.835" Minimum ID = 3.725" @ 9567" 4-1/2" HES XN NIPPLE I 4-1/2" TBG,12.6#, 13-0-80, 10 = 3.958" 4-1/2" TBG,12.6#, L-80, .0152 bpf, 10 = 3.958" H RA PlPTAG RA PIP TAG I FISH - 28' BKR WS ON TOP OF ML PKR 7" X 4-1/2" BKR ML PKR, 10 = 3.875" I 4-1/2" HES X NIP, 10=3.813" 4-1/2" HES XN NIP. 10 = 3.725" I 4-1/2" WLEG, 10 = 3.958" TOP OF TWV TIEBACK SLV, 10 = 5.374" I I 7" X 4-1/2" TWV S-6 PKR, 10 = 3.868" I I 7" X 4-1/2" TWV OlliS HGR, 10 = 3.925" I I 7" CSG, 26#, L-80, .0383 bpf, 10 = 6.276" ÆRFORA TION SUMMARY REF LOG: SLOTTED LINER ANGLE AT TOP ÆRF: 65 @ 9532' Note: Refer to Production DB for historical perf data SIZE SPF INTERVAL OpníSqz DA TE 5-44 L 1 9532 - 10306 10392 - 11502 11584 - 12350 S-44 4-1/2" SLTO 10927 -13128 4-1/2" SL TO 4-1/2" SLTO 4-1/2" SL TO C C C C DA TE REV BY COMMENTS 05/02/97 ORIGINAL COMPLETION 03/26/02 CHlKAK CORRECTIONS 05/02/03 PP/KAK W8..L NAME & API # REV 09/25/05 wrSfTLH XX PLUG SET (06/17/03) 06110/06 MJM Proposed RWO Completion 06/27/06 LV Actual Completion S-44L 1 FROM DRLG - DRAFT 1763' 5 NOTES: > 70 DEG @ 9690' & > 90 DEG @ 12 . * 5-44 L1IS AN OH SL T'D LNR W/O PKR OR HGR. NOT WL ACCESSIBLE. FISH: BAKER WHIPSTOCK ON TOP OF ML PKR@ 9514'. RIG WAS UNABLE TO RETRIEVE IT AFfER DRILLING 5-44 L 1.....CHROMETBG·· 2114' -14-1/2" X-NIP, 10 - 3.813" GAS LIFT MANDRELS ST MO TVD OEV TYÆ VLV LATCH PORT DATE 5 3437 3437 0 KBG-2 DOME BK 16 05/01/07 4 5685 5585 29 KBG-2 DOME BK 16 05/01/07 3 7299 6981 31 KBG-2 DOME BK 16 05/01/07 2 8364 7900 31 KBG-2 DMY BK 0 06/24/06 1 9016 8465 32 KBG-2 SO BK 24 05/01/07 9195' 9245' 9084' 9104' 9128' 9200' 9225' 9236' 9245' - 4-1/2" HES X NIP, 10 = 3.813" I ~ 7" x 4-1/2" BKR S-3 PKR, 10 = 3.875" I -14-1/2" HES X NIP, 10 = 3.813" -1 Tubing Cut w / Unique Overshot -14-1/2" HES X NIP, 10 = 3.813" I ~7" x 4-1/2" BKR 8-3 PKR, 10'" 3.875" I -I8™ OF DAMAGED TBG TAIL I FISH AT WINDOW (48' OF TBG TAIL) TAGGED 09/04/06 ~ I 9528' HBKRSETTINGSLV,ID-5.250" I -- --.......... I BTM OF 4-1/2" SL T'D LNR H 12350' ~ .....----- -- -- ----- ..... ----- ..... ..... ----- 9532' I TOP OF 4-1/2" SL 4-1/2"SL TO LNR,12.6#,L-80,.0152bpf, ID= 3.958" I ~ "- "- "- "- "- .... "- "- "- ..... I B1M0F4-112"SLTOLNRH 1312J ~'~f I 4-1/2" SLTD LNR, 12.6#, L-80, .0152 bpf, 10 = 3.958" I 13130' I HES CMrR H 05/02/97 05/02/97 05/02/97 05/02/97 DATE 08/11/06 09/04/06 12/24/06 05/01/07 REV BY COMMENTS OA V /PJC GL V ClO RRD/PJC FISH- 48' TBG TAIL JPKlPAG GLV ClO (08/11/06)-CORREC JRPíPJC GL V C/O I I 13127' I~ PRUDHOE BA Y UNrr W8..L: $-44 L 1 ÆRMrr No: "1970070 API No: 50-029-22735-60 SEC 35, T12N, R12E, 4242' NSL & 4502' W8.. BP Exploration (Alaska) _ STATE OF ALASKA I ALAWÄ Oil AND GAS CONSERVATION COM SSION JUL 1 1 2006 REPORT OF SUNDRY WELL OPERATIONS C ., Alaska Oil & Gas Cons. omtnlSSlon RECEIVED . L 1. Operations Performed: v o Abandon o Repair Well o Plug Perforations o Stimulate o Re-Enter Suspended Well o Alter Casing 181 Pull Tubing o Perforate New Pool o Waiver o Other o Change Approved Program o Operation Shutdown o Perforate o Time Extension 2. Operator Name: 4. Well Class Before Work: 5. Permit To Drill Number: BP Exploration (Alaska) Inc. 181 Development o Exploratory 197-007 3. Address: o Stratigraphic o Service 6. API Number: P.O. Box 196612, Anchorage, Alaska 99519-6612 50-029-22735-60-00 7. KB Elevation (ft): 67' 9. Well Name and Number: PBU S-44L 1 8. Property Designation: 10. Field 1 Pool(s): ADL 028258 Prudhoe Bay Field 1 Prudhoe Bay Pool 11. Present well condition summary Total depth: measured 12486 feet true vertical 8760 feet Plugs (measured) None Effective depth: measured 12486 feet Junk (measured) None true vertical 8760 feet Casing Length Size MD TVD Burst Collapse Structural Conductor 110' 20" 110' 110' 1490 470 Surface . ~ 3090 3098' 9-5/8" 3130' 3130' 5750 Intermediate 10175' 7" 9506' 8751' 7240 5410 Production Liner 2845' 4-112" 9528' - 12373' 8761' - 8758' 8430 7500 .,c. ~'" . , I ,i'~! .::: ".: ";;" '.L 1.;;-' _, " Perforation Depth MD (ft): 9532' - 12350' Perforation Depth TVD (ft): 8762' - 8758' 4-1/2", 12.6# 13Cr80 1 L -80 9293' Tubing Size (size, grade, and measured depth): Packers and SSSV (type and measured depth): 7" x 4-1/2" Baker 'S-3' packer; 7" x 4-112" Baker 'S-3' 9236'; 9105' packer 12. Stimulation or cement squeeze summary: Intervals treated (measured): R8DMS 8Fl JUL 1 1 2DD6 Treatment description including volumes used and final pressure: 13. Representative Daily Average Production or Injection Data Oil-Bbl Gas-Met Water-Bbl CasinQ Pressure Tubina Pressure Prior to well operation: Subsequent to operation: 14. Attachments: 0 Copies of Logs and Surveys run 15. Well Class after proposed work: 181 Daily Report of Well Operations o Exploratory 181 Development o Service 16. Well Status after proposed work: 181 Well Schematic Diagram 181 Oil o Gas o WAG OGINJ OWINJ o WDSPL 17. I hereby certify that the foregoing is true and correct to the best of my knowledge. SUndry Number or N/A if C.O. Exempt: Contact Matt Martyn, 564-4101 N/A Printed Name Terrie Hubble Title Technical Assistant Signature ~ ~ Phone 564-4628 07(10 Ii Prepared By Name/Number: Date D (¡, Terrie Hubble, 564-4628 Form 10-404 Revised 04/2006 Submit Original Only TREE = WElLHEAD = ACTUATOR = KB. 8...EV - BF. 8...EV = KOP= Max Angle = Datum MD = Datum TVD = 4-1/16" CWV FMC BAKER 66.2' 35.7' 4452' 104 @ 10550' I HES CMTR H e 8800'SS 5 -44 L 1 FROM DRLG - DRAFT ~Y NOTES: > 70 DEG @ 9690' & > 90 DEG @ _3'. * S-44 l1 IS AN OH SL T'D LNR WIO PKR OR HGR NOT WL ACCESSIBLE RSH: BAKER WHIPSTOCK ON TOP OF M L PKR @ 9514'. RIG WAS UNABLE TO RETRIEVE IT AFTER DRILLING S-44 L 1.......CHROMETBG... 1763' 1-: :~ 2114' H4-1I2" X-NIP, D - 3.813" I GAS LIFT MANDRElS ~ ST MD TVO OEV TYÆ VL V LATCH PORT DATE 5 3437 3437 0 KBG~2 OMY BK 0 06/24/0 4 5685 5585 29 KBG-2 OMY BK 0 06/24/0 3 7299 6981 31 KBG-2 DMY BK 0 06/24/0· 2 8364 7900 31 KBG~2 OMY BK 0 06/24/0 1 9016 8465 32 KBG~2 DCK BEK 0 06/24/0' I 9084' - 4~1/2" HES X NIP, 10 = 3.813" I I 9104' IJ 7" x 4-1/2" BKR S-3 PKR, 10 = 3.875" I 9128' 1--14-1/2" HES X NIP, 10 - 3.813" I 9200' H Tubing Cut w / Unique Overshot I 9225' - 4-1/2" HES X NIP, 10 = 3.813" I 9236' ~ 7" x 4-1/2" BKR S-3 PKR, 10 = 3.875" I 9259' - 4-1/2" HES X NIP, 10 = 3.813" I 9280' -j4-1/2" HES X NIP, 10 - 3.813" I 9293' J4-1/2" WLEG, 10 = 3.958" , I 9-5/8" CSG, 40#, L-80, 10 = 8.835" I 3130' 1-.4 Minimum ID = 3.725" @ 9567" --; .......!: 4-1/2" HES XN NIPPLE I . :8: ...,.-, ~ I I 4-1/2" TBG,12.6#, 13-Cr-80, 10 = 3.958" I 9195' I I :8: ..,.......,. .2S. I I . I 4-112" TBG,12.6#, L-80, .0152 bpf, 10 = 3.958" H 9292' I I RA PIP TAG I 9381' I---i I RA PIP TAG I 9505' H FISH - 28' BKR WHIPSTOCK ON TOP OF ML PKR I 9514' I 7" X 4-1/2" BKR ML PKR, 10 = 3.875" I 9542' I 4-1/2" HES X NIP, 10 = 3.813" I 9560' I I 4-1/2" HES XN NIP, 10 = 3.725" 9567' I 4-1/2" WLEG, 10 = 3.958" I 9576' I TOPOFTWVTIEBACKSLV, 10=5.374" I- I 7" X 4-1/2" TWV S-6 PKR, 10 = 3.868" I- I 7" X 4-1/2" Trvv DTH-S HGR, 10 = 3.925" I- I 7" CSG, 26#, L-80, .0383 bpf, 10 = 6.276" I ÆRFORA TION SUMMARY REF LOG: SLOTTED LINER ANGLE AT TOP ÆRF: 65 @ 9532' Note: Refer to Production DB for historical perf data SIZE SPF INTERVAL Opn/Sqz DA TE S-44 L1 9532 - 10306 10392 - 11502 11584 - 12350 S-44 4-1/2" SLTO 10927 -13128 4-1/2" SL TO 4-1/2" SL TO 4-1/2" SL TO C C C 05/02/97 05/02/97 05/02/97 c DATE REV BY COMMENTS 05102197 ORIGINAL COM PLETION 03/26/02 CHlKAK CORRECTIONS 05/02103 PA'KAK W8...L NAME & API # REV 09/25/05 WTSITlH XX RUG SET (06/17/03) 06/10/06 MJM Proposed RYVO Corrpletion 06/27/06 LV Actual Corrpletion 9939' 9945' 9951' 10204' ~ I 9528' H BKR SETTING SL V, 10 = 5.250" I a ... I 9532' H TOP OF 4-1/2" SL TO LNR I -rg \'----- ' '-''____ 2$. I I \ - ""'____,~~~"----'" I I \ ....---.... ....... 7" CSG MILLOUT WINDOW .... IJ 9506' - 9518' (5-44 L 1) I B1M OF 4-112" Sl TO l'" H 1~] I F I 4-1/2"SL TO LNR,12.6#,L-80,.0152bpf, D= 3.958" I 12373' ~ ~ ~ 10878' H CTC EXT CSG PKR, 10::: 3.885" I I 05/02/97 ~ 10927' - TOPOF4-1/2"SLTDLNR .... .... .... .... .... .... .... .... .... .... ...... .... .... .... .... .... I B1MOF4-112"SlTOlNRH 13128~'~f I I 4-1/2" SLTDLNR, 12.6#, L-80, .0152 bpf, D- 3.958" I 13130' / I HES CMTR H 10875' I I 13127' I~ DATE PRUDHOE BA Y UNIT W8...l: 5-44 L1 ÆRMIT No: 1970070 API No: 50-029-22735-60 SEe 35, T12N, R12E, 4242' NSL & 4502' W8... REV BY COMMENTS BP Exploration (Alaska) e e S-44 / S-44L 1 Prudhoe Bay Unit 50-029-22735-00 197-006 Accept: Spud: Release: Ri: PRE-RIG WORK 06/10/06 DRIFTED TO 9400' SLM, WI 3.80" GAUGE RING, 4.5" 'X' EO PRONG BRUSHED LOWER 'X' NIPPLES WI 3.80" GAUGE RING, 4 1/2" BL BRUSH RIH WI 4.5" XX PLUG. 06/11/06 SET 41/2" XX PLUG AT 9245' SLM (T =480 IA=750) (8) 1/8" EO. PORTS RAN 41/2" CK SET (GOOD SET). BLED TUBING PRESSURE DOWN 300 PSI (GOOD TEST). 06/14/06 RIH WI 3.5" 10' DUMP BAILER AND SLUGGITS, DUMP SLUGGITS FROM 9254' SLM TO 9245' SLM. 06/15/06 RIH W/3.25" CENT TO 9243' SLM, 10' OF SLUGGITS ARE ON TOP OF XX TTP. 06/18/06 ATTEMPT 3.65" JET CUT AND TOOLS SET DOWN 6165'. POOH TO FIND ONLY SMALL AMOUNT OF TARlPARAFIN ON CENTRALIZERS. WELL SHUT IN. 06/19/06 DRIFTED WI 3.75" LIB TO 9210' SLM, IMPRESSION OF SLUGGITS. DRIFTED WI 3.70" CENT, 4.5" BLB AND 3.80" G-RING TO 9210' SLM. ENCOUNTERED NO PROBLEMS. JET CUT TUBING AT 9195', MIDDLE OF FIRST FULL JOINT ABOVE PACKER, USING 3.65" SLB POWER CUTTER. SAT DOWN AT 9240'. JOB COMPLETE. Legal Well Name: Common Well Name: Event Name: Contractor Name: Rig Name: S-44 S-44 WORKOVER NABORS DRILLING CO. NABORS Start: 6/22/2006 Rig Release: 6/27/2006 Rig Number: 7es Spud Date: 1/25/1997 End: 6/27/2006 Date From -To Hours Task Phase Description ofpþerations 6/22/2006 00:00 - 01 :30 1.50 MOB P PRE Oisconnect power between pits and sub base. Remove top drive from blocks. Bridal up. Lower cattle chute. 01:30 - 02:00 0.50 MOB P PRE Lay down derrick. 02:00 - 04:30 2.50 MOB N WAIT PRE Wait on Peak equipment due to 4es rig move. 04:30 - 05:30 1.00 MOB P PRE Move mud pits away from sub base. 05:30 - 07:00 1.50 MOB P PRE Move sub base off well G-17A. 07:00 - 12:00 5.00 MOB P PRE Install jeep under mud pits. Move camp, shop and mud pits to entrance of north extension of S pad. 12:00 - 16:00 4.00 MOB N WAIT PRE Wait on tool service to lay mats at the entrance for the north extension of S pad. 16:00 - 18:00 2.00 MOB P PRE Move camp and set on north extension of S pad. Spot pits. Set shop next to Kuskokwim camp. 18:00 - 00:00 6.00 MOB P PRE Move sub base from G pad to east kuparuk river bridge. 6/23/2006 00:00 - 06:00 6.00 MOB P PRE Continue to move sub base from the east kuparuk river bridge to S pad. 06:00 - 07:00 1.00 RIGU P PRE Spot and level sub base over well S-44. Rig acceptance backed up 4 hours due to time waiting on matting boards. Rig accepted at 06:00 hours 6-23-2006 07:00 - 10:00 3.00 RIGU P PRE Secure cellar, Set mats, Set mud pits in place, Hook up service lines, Rasie derrick and cattle chute, Bridal down, Connect top drive to blocks. 10:00 - 11 :00 1.00 KILL P DECOMP Rig up circulating lines, Prep rig floor. 11 :00 - 11 :30 0.50 WHSUR P DECOMP Rig up DSM lubricator and pull BPV, Rig down DSM lubricator. 11 :30 - 12:30 1.00 KILL P DECOMP Pressure test lines to 3500 psi. Circulate 50 bbls 8.5 ppg 120 degrees sea water down the 4 1/2" x 7" annulus taking returns up the 4 1/2" tubing out to the cuttings box at 4bpm at 330 psi. 12:30 - 15:00 2.50 KILL P DECOMP Switch lines and pump 50 bbl Safe Surf-O soap sweep followed by 120 degrees 8.5 ppg sea water down the 41/2" tubing taking returns up the 4 1/2" x 7" annulus out to the cuttings box at 4 bpm 290 psi. Recovered 75 bbls of freeze protect. Monitor well. Static 15:00 - 15:30 0.50 WHSUR P DECOMP Blow down lines, Install TWC and set from below to 1000 psi. 15:30 - 17:00 1.50 WHSUR P DECOMP Nipple down adapter flange and tree. Verify hanger threads 4 1/2" NSCT 61/2 tums by hand. Terminate control lines. Leaving tree in cellar. 17:00 - 19:00 2.00 BOPSU P DECOMP Nipple up BOP. 19:00 - 00:00 5.00 BOPSU P DECOMP Test BOP and associated valves to 250 psi low 3500 psi high with 4" test joint and 4 1/2" test joint to meet AOGCC requirments. BOP test witnessed by AOGCC rep Chuck Sheive, WSL Wade Frame, Nabors tool pusher Cris Weaver. Note: Unable to test lower pipe rams with 4" and 4 1/2" test joint due to height of hanger neck. 6/24/2006 00:00 - 00:30 0.50 BOPSU P DECOMP Rig down test equipment. 00:30 - 01 :30 1.00 WHSUR P DECOMP Rig up DSM lubricator and pull TWC. Rig down lubricator. 01 :30 - 02:30 1.00 PULL P DECOMP Pick up landing joint. BOLDS. Pull hanger to rig floor. Hanger came off seat at 130k. Up weight remained constant at 130k. Monitor well bore. Static. 02:30 - 03:00 0.50 PULL P DECOMP Terminate control lines. Break hanger. Lay down landing joint and hanger. 03:00 - 04:00 1.00 PULL P DECOMP Pre job safety meeting with all hands, Schlumberger eonceming safe eontrolline spooling procedure. Rig up casing tongs and Cameo spooling unit 04:00 - 11:30 7.50 PULL P DECOMP Pull out of the hole laying down 41/2" 12.6# L-80 IBT tubing. Printed: 71512006 10:11:57 AM Legal Well Name: Common Well Name: Event Name: Contractor Name: Rig Name: S-44 S-44 WORKOVER NABORS DRILLING CO. NABORS Start: 6/22/2006 Rig Release: 6/27/2006 Rig Number: 7es Spud Date: 1/25/1997 End: 6/27/2006 Date From - To Hours Task Code NPT Phase DescriptionofQþerations 6/24/2006 04:00 - 11 :30 7.50 PULL P DECOMP Recovering 1 SSSVand 1 GLM, 56 SSCLB. 11 :30 - 12:00 0.50 PULL P DECOMP Rig down Schlumberger control line spooling unit. 12:00 - 16:30 4.50 PULL P DECOMP Pull out of the hole laying down 4 1/2" 12.6# L-80 IBT tubing. Sea water weight in 8.5 ppg. Out 8.5 ppg Recovering 218 full joints + a 21.16' cut off. End of cut joint flared to 5". 16:30 - 17:30 1.00 PULL DECOMP Rig down casing equipment. Clear and clean floor. 17:30 - 18:00 0.50 BOPSU DECOMP Rig up test equipment. Install test plug. 18:00 - 19:00 1.00 BOPSU DECOMP Test bottom pipe rams with 4" and 4 1/2" test joint to 250 psi low 3500 psi high. Witnessed by WSL Wade Frame and Nabors Toolpusher Cris Weaver. 19:00 - 19:30 0.50 BOPSU DECOMP Rig down test equipment. Pull test plug and set wear bushing 19:30 - 20:00 0.50 CLEAN DECOMP Service top drive. 20:00 - 22:30 2.50 CLEAN OECOMP Pick up BHA #1 consisting of a 6" 00 dressing mill, 2 5 3/4" wash pipe extensions, 43/4" inner mill, boot basket, double pin sub, 7" casing scraper, bit sub, bumper sub, oil jar, pump out sub, 943/4" drill collars, cross over sub = 320.37'. 22:30 - 00:00 1.50 CLEAN P DECOMP Pick up 37 joints 4" HT-40 drill pipe from pipe shed. 6/25/2006 00:00 - 08:30 8.50 CLEAN P DECOMP Continue to pick up 4" HT-40 drill pipe from pipe shed to 9016' 08:30 - 10:00 1.50 CLEAN P DECOMP PJSM. Cut and slip of 116' drilling line, Inspect and adjust brakes, Hook up blower hose. 10:00 - 10:30 0.50 CLEAN P DECOMP Continue to pick up 4" HT-40 drill pipe from pipe shed to 9175". Picked up total of 279 joints of 4" HT-40 drill pipe. 10:30 - 11 :30 1.00 CLEAN P DECOMP Establish milling parameters prior to tagging 4 1/2" tubing stub. Up weight 175k. Slack off weight 160k. Rotating weight 165k. 40 rpm. Torque off 3 to 4k. Torque on bottom 4 to 7k. 200 gpm at 580 psi. Tag 41/2" tubing stub at 9191.5'. Milled over 4 1/2" tubing stub 10' to 9201.5'. Dressing top of 4 1/2" tubing stub 2". Pull off 4 1/2" tubing stub and go back over 4 1/2" tubing stub with out rotation. Reconfrim top of 4 1/2" tubing stub at 9191.5' by washing over stub with pipe rotation. Check stub with and with out rotation. Pump Hi-Vis sweep, Allow sweep to clear BHA and pick up above 41/2" tubing stub. Sea water weight in 8.5 ppg. Out 8.5 ppg. 11 :30 - 12:30 1.00 CLEAN DECOMP Circulate sweep out of the hole at 500 gpm 2000 psi. 12:30 - 15:30 3.00 CLEAN DECOMP Pull out of the hole form 9171' to 2518'. 15:30 - 16:00 0.50 BOPSU DECOMP PJSM. Make up and set Halliburton 7" storm packer 6' below tubing head. 16:00 - 17:00 1.00 BOPSU DECOMP Pull wear bushing. Make up pack off retriving tool and pull 7" pack off. Install new 7" pack off. RILDS and test to 5000 psi for 10 minutes. Install wear bushing. 17:00 - 18:00 1.00 BOPSU DECOMP Retrieve Halliburton storm packer and lay down. 18:00 - 19:00 1.00 CLEAN DECOMP Pull out of the hole from 2518' to 320'. 19:00 - 20:00 1.00 CLEAN DECOMP Stand back 4 314" drill collars, lay down pump out sub, oil jar, bumper sub,7" casing scraper, double pin sub, 5 314" boot basket, 4314" inner mill, 2 5 314" wash pipe extensions, 6" dressing mill. 20:00 - 20:30 0.50 CLEAN P DECOMP Rig up 2 718" casing equipment. 20:30 - 22:30 2.00 CLEAN P DECOMP Pick up BHA #2 consiting of 3 5/8" reverse junk basket, bit sub, 43 1/8" pac drill collars, cross over sub, double pin sub, 2 4 314* boot basket, bit sub, bumper sub, oil jar, pump out sub, and run in the hole with 3 stands of 4 314* drill collars and cross over sub = 436.19'. 22:30 - 00:00 1.50 CLEAN P DECOMP Run in the hole from 436' to 2061' Printed: 71512006 10:11:57 ÞH. Legal Well Name: Common Well Name: Event Name: Contractor Name: Rig Name: Date S-44 S-44 WORKOVER NABORS DRILLING CO. NABORS 6/26/2006 6/27/2006 From - To Hours Task Code NPT Phase 00:00 - 02:30 2.50 CLEAN P DECOMP 02:30 - 03:00 0.50 CLEAN P DECOMP 03:00 - 04:00 1.00 CLEAN P DECOMP 04:00 - 04:30 0.50 CLEAN P I I DECOMP DECOMP 04:30 - 12:30 8.00 CLEAN P 12:30 - 15:00 2.50 CLEAN P DECOMP 15:00 - 15:30 0.50 CLEAN DECOMP 15:30 - 16:00 0.50 BOPSU DECOMP 16:00 - 16:30 0.50 RUNCO RUNCMP 16:30 - 18:00 1.50 RUNCO RUNCMP 18:00 - 00:00 6.00 RUNCMP 00:00 - 08:00 RUNCMP 8.00 RUNCMP 08:00 - 10:00 2.00 10:00 - 11 :30 1.50 RUNCO RUNCMP RUNCMP 11:30 -14:30 3.00 RUNCO Start: 6/22/2006 Rig Release: 6/27/2006 Rig Number: 7es Spud Date: 1/25/1997 End: 6/27/2006 Df3scription of OperatiQns Continue to run in the hole from 2061' to 9180'. Establish parameters prior to tagging 41/2" tubing stub. Up weight 175k. Slack off weight 165k. Rotating weight 165k. 10 rpm. Torque off 2 to 2.5k.Tag 41/2" tubing stub at 9191.5' DPM with 2k down weight. Work drill string twice in an attempt to pass thru 4 1/2" tubing each time setting 2k on top of 4 1/2" tubing stub. Set 1 k down weight on top of 4 1/2 tubing and rotate revese circulating basket into 41/2" tubing. Begin washing from 9191.5' to 9252' DPM with 10 rpm, 163 gpm 767 psi 2 to 3k on reverse circulating basket. At 9252' weight would not drill off, picked up to 9250' and wash down to 9252'. Observe a 200 psi pressure loss, shortly after that returns were lost, fill hole from the back side thur the kill line and continue to wash down to 9297' DPM. WLEG at 9293'. Sea water weight in 8.5 ppg In. Out 8.5 ppg. Prepare to lay down 4" HT-40 drill pipe while monitoring well bore. Static loss rate at 380 bbllhr. Pull out of the hole laying down 279 joints of 4" HT-40 drill pipe. Static loss rate slowed to 300 bbllhr. Total fluid lost while laying down drill pipe 1865 bbl of 8.5 ppg sea water Lay down BHA, cross over sub, 9 4 3/4" drill collars, pump out sub, oil jar, bumper sub, bit sub, 243/4" boot baskets, double pin sub, cross over, 4 31/8" pac drill collars, bit sub and 3 5/8" reverse circulating basket. Service top drive and crown section. Pull wear bushing and make dummy run with hanger. Rig up Nabors torque tum equipment and compensator. Pre job safety meeting with all hands Baker representative, Nabors casing hand, Nabors tool pusher and WSl. Run in the hole with 41/2" 12.60# 13 Cr-80 Vam-Top tubing to 4560'. Baker-Loc all connections below Baker 7" x 41/2" S-3 packer. Optium torque 4400. Lost 4016 bbls of 8.5 ppg sea water to well bore. Run in the hole with 41/2" 12.60# 13 Cr-80 Vam-Top tubing to 9204'. Verified bottom out on 41/2" tubing stub with Unique Machine Overshot by shearing pins (4) on Unique Machine Overshot with 8k down weight. Pick up to netural weight + 3' to space out. Make up hanger and land the same. Run in lock down screws. Up weight 140k. Slack off weight 120k Ran a total of 213 joints of 41/2 13 Cr-80 Vam-Top tubing. Space out pups used 9.91',10.12' Rig up lines and reverse circulate 171 bbls of inhibited 8.5 ppg sea water at 200 psi. Did not have any retums while pumping inhibited sea water. Drop ball and rod allow to fall. Pressure up on tubing to 3500 psi to set Baker S-3 type packer. Record pressure on chart for 30 minutes. Bleed pressure tubing from 3500 psi to 1500 psi and shut in. Pressure up on the 41/2" x 7" annulus to 3500 psi and record pressure on chart for minutes. Bleed annulus pressure to 0 psi, then bleed tubing pressure to 0 psi. Pressure Printed: 71512006 10:11:57 NIt Legal Well Name: Common Well Name: Event Name: Contractor Name: Rig Name: 5-44 S-44 WORKOVER NABORS DRILLING CO. NABORS Start: 6/22/2006 Rig Release: 6/27/2006 Rig Number: 7es Spud Date: 1/25/1997 End: 6/27/2006 Description of Operations 6/27/2006 11 :30 - 14:30 From- Tó Hours Task Code NPT Phase 3.00 RUNCO RUNCMP up on annulus and DCK valve. DCK valve sheared at 2700 psi. Pump 2 bbls 8.5 ppg sea water down the tubing at 90 gpm 630 psi. Pump 3 bbls 8.5 ppg sea water down the annulus at 90 gpm 630 psi to verify OCK valve sheared. Date 14:30 - 15:00 15:00 - 15:30 15:30 - 16:30 16:30 - 18:00 18:00 - 19:00 19:00 - 20:00 20:00 - 21 :00 21 :00 - 23:00 23:00- 23:30 23:30 - 00:00 0.50 BOPSU P 0.50 RUNCO 1.00 BOPSU P 1.50 WHSUR P Total 8.5 ppg Sea water lost to RWO = 6300 bbls RUNCMP Install TWC in tubing hanger and test from below to 1000 psi. RUNCMP Rig down and blow down lines. RUNCMP Nipple down BOP and set back on stand. RUNCMP Nipple up Adapter flange and test to 5000 psi for 10 minutes. Nipple up tree and test to 5000 psi for 10 minutes. Record test pressure on chart. RUNCMP Rig up DSM lubricator and pull TWC. Rig down OSM lubricator. RUNCMP Pre job safety metting. Rig up hoses to freeze protect and test lines to 3000 psi. RUNCMP Reveres circulate pumping 75 bbls of 70 degrees diesel, using Lttle Red Hot Oil Services. Taking returns up the tubing out to the cuttings tank. RUNCMP Allow diesel to U-Tube. RUNCMP Install BPV and test from below to 1000 psi using little Red Hot Oil Services. Rig down and blow down lines. RUNCMP Secure tree. 1.00 WHSUR P 1.00 WHSUR P 1.00 WHSUR P 2.00 WHSUR P 0.50 WHSUR P 0.50 WHSUR P Rig Released from S-44 at 23:59 hours on 6/27/2006. Printed: 71512006 10:11:57 AM THE MATERIAL UNDER THIS COVER HAS BEEN MICROFILMED ON OR BEFORE JANUARY 03, 2001. M p l_ ATE IA L U W N U TH IS M ARK E R C:LORIhM~ILM.DOC PERMIT DATA AOGCC Individual Well Geological Materials Inventory T DATA PLUS Page: 1 Date: 05/24/99 RUN RECVD 97-007 97-007 97-007 97-007 ARC/GR-MD 8312 ARC5/GR-MD 8330 10-407 DAILY WELL OPS 10332-10960 ~P~SCHLUM GR ARC5 ~ 8946-10768 ~ / ~' SCHLUM GR-ARC5 PB1 ~°~~o~ ~ ~ ~ Al ~ ~1 ~--R' ~ ,-.1~.~3/~// TO ~1 ~1~1 T D BOX -- Are dry ditch samples required? yes Was the well cored? yes ~'~ Analysis & description received? Are well tests required?ii yes n~.~i. Received? Well is in compliance Initial COMMENTS received? y FINAL 02112/98 T 1-6 02/12/98 FINiaL 02119/98 T 1 02/19/98 GeoQuest 500 W. International Airport Road Anchorage, AK 99518-1199 ATTN: Sherrie NO. 11970 Company: Field: Alaska Oil & Gas Cons Comm Attn: Lori Taylor 3001 Porcupine Drive Anchorage, AK 99501 Prudhoe Bay (Cased Hole) 3/30/98 Well Job # Log Description Date BL RF Sepia LIS Tape '"'- "7'7. o"~.~ '&t .otq B-12A · PERFORATING RECORD 9 80 3 0 7 I 1 F- 37 ~ PERFORATION RECORD 9 80 2 2 6 I 1 F-41 , PERFORATING RECORD 9 80 3 0 3 I 1 G-09' IBP/CCL TIE IN LOG 980227 I 1 H- 08 · PERFORATING RECORD 9 8 0 3 0 4 I 1 H- 13 ~' PERFORATING RECORD 9 80 3 02 1 1 H- 150 PERFORATING RECORD 9 80 2 2 8 1 1 H- 18 ~, PERFORATING RECORD 9 80 3 01 I 1 H- 26 ~ PERFORATING RECORD 9 8 0 3 0 4 I 1 : H- 3 3 ~ PERFORATING RECORD 9 8 0 3 0 5 I 1 !J- 16 ' PERFORATING RECORD 9 8 0 31 9 1 1 i Y-01 A, COMPLETION RECORD 9 8 0 3 0 9 1 1 Z- 14 , JEWELRY LOG 9 8 0 316 I I -- PLEASE ACKNOWLEDGE RECEIPT BY SIGNING AND RETURNING ONE COPY EACH TO: BP Exploration (Alaska) Inc. Petrotectnical Data Center MB3-3 900 E. Benson Blvd. Anchorage, Alaska 99519-6612 Date Delivered: Schlumberger GeoQuest 500 W. International Airport Road Anchorage, Alaska 99618-1199 Received by: 2/13/98 GeoQuest 500 W. International Airport Road Anchorage, AK 99518-1199 ATTN: Sherrie NO. 11816 Company: Alaska Oil & Gas Cons Comm Attn: Lori Taylor 3001 Porcupine Drive Anchorage, AK 99501 Field: Prudhoe Bay (Open Hole) LIS Well Job # Log Description Date BL RF Sepia Tape S-44 L1 PB1 '-~' ~'~'~'~ 98057 MWD GR & ARC5 970329 I I I -- PLEASE ACKNOWLEDGE RECEIPT BY SIGNING AND RETURNING ONE COPY EACH TO: BP Exploration (Alaska) Inc. Petrotectnical Data Center MB3-3 900 E. Benson Blvd. Anchorage, Alaska 99519-6612 Date Delivered: Schlumberger GeoQuest 500 W. International Airport Road Anchorage, Alaska 99618-1199 /. · .,,~ /, /' "\ ' /' 2/9/98 GeoQuest 500 W. International Airport Road Anchorage, AK 99518-1199 ATTN: Sherrie NO. 11795 Company: Alaska Oil & Gas Cons Comm Attn: Lori Taylor 3001 Porcupine Drive Anchorage, AK 99501 Field: Prudhoe Bay (Open Hole) LIS Well Job # Log Description Date BL RF Sepia Tape S-44 L1 ~ ,~¢-.~,~ 97225 MWD GR & ARC5 970404 1 I I -- -- PLEASE ACKNOWLEDGE RECEIPT BY SIGNING AND RETURNING ONE COPY EACH TO: BP Exploration (Alaska) Inc. Petrotectnical Data Center MB3-3 900 E. Benson Blvd. Anchorage, Alaska 99519-6612 Date Delivered: Schlumberger GeoQuest 500 W. International Airport Road Anchorage, Alaska 99618-1199 STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMMISSION WELL COMPLETION OR RECOMPLETION REPORT AND LOG 1. Status of Well Classification of Service Well [] Oil [--I Gas [--I Suspended I--I Abandoned [] Service 2. Name of Operator 7. Permit Number BP Exploration (Alaska)Inc. 97-07 3. Address 8. APl Number P.O. Box 196612, Anchorage, Alaska 99519-6612.., .................. . 50-029-22735-60 4. Location of well at surface I '''q ....... , .... ,,,,,,----,-.,~. 9. Unit or Lease Name At top of productive interval l '~FiErJi~l -~;~'~i 10. Well Number 4553' NSL, 1748' WEL, SEC. 34, T12N, R12E S-44L1 i ___At tot,al depth , ~- ................. ': 11. Field and Pool ;2";J'7~ NSL, 4550 WEL, SEC. 27, T12N, R12E ~ Prudhoe Bay Field / Prudhoe Bay 5. Elevation in feet (indicate KB, DF, etc.) 16. Lease Designation and Serial No. Pool KBE = 67'I ADL 028258 12. Date Spudded5/2/97 113' Date T'D' Reached I 14' Date C°mp" Susp" °r Aband115' Water depth' if °fish°re 116' N°' °f C°mpleti°ns4/6/97 5/2/97 N/A MSL One 17. Total Depth (MD+TVD)118. Plug Back Depth (MD+TVD)I19. Directional Survey t20. Depth where seeM set 121. Thickness of Permafrost 12486 8760 FTI 12486 8760 FTI [~Yes I--]No (Nipple) MD 1900' (Approx.) 22. Type Electric or Other Logs Run MWD, GR, LWD: DIR / FE / DD, RES 23. CASING~ LINER AND CEMENTING RECORD CASING SETTING DEPTH HOLE SIZE WT. PER FT. GRADE TOP BOTTOM SIZE CEMENTING RECORD AMOUNT PULLED 20" 91.5# H-40 Surface 110' 30" 260 sx Arctic Set (Approx.) 9-5/8" 40# L-80 32' 3130' 12-1/4" 1181 sx Coldset III, 430 sx Class 'G' 7" 26# L-80 29' 9506' 8-1/2" 620 sx Class 'G' 4-1/2" 12.6# L-80 9528' 12373' 6" LJncemented Slotted Liner 24. Perforations open to Production (MD+TVD of Top and 25. TUBING RECORD Bottom and interval, size and number) SIZE DEPTH SET (MD) PACKER SET (MD) 4-1/2" Slotted Liner 4-1/2", 12.6#, L-80 9293' 9236' MD TVD MD TVD 9532' - 12350' 8762' - 8758' 26. ACID, FRACTURE, CEMENT SQUEEZE, ETC. DEPTH INTERVAL (MD) AMOUNT & KIND OF MATERIAL USED Freeze Protect with 77 Bbls of Diesel 27. PRODUCTION TEST Date First Production I Method of Operation (Flowing, gas lift, etc.) May 24, 1997I Gas Lift Date of Test Hours Tested PRODUCTION FOR OIL-DEL GAS-MCF WATER-DEL CHOKE SIZE IGAs-OIL RATIO TEST PERIOD I Flow Tubing Casing Pressure CALCULATED OIL-BBL GAS-MCF WATER-BBL OIL GRAVITY-APl (CORR) Press. 24-HOUR RATE 28. CORE DATA Brief description of lithology, porosity, fractures, apparent dips and presence of oil, gas or water. Submit core chips. ,Alaska Oil & Anchorage Form 10-407 Rev. 07-01-80 Submit In Duplicate 29. Geologic Markers 30. Formation Tests Measured True Vertical Include interval tested, pressure data, all fluids Marker Name Depth Depth recovered and gravity, GOR, and time of each phase. ~Sag River 9498' 8748' 31. List of Attachments Summary of Daily Drilling Reports, Surveys 32. I hereby certify that the--f'°-~eg°ing Signed S-44L1 97-07 Prepared By Name/Number: Terrie Hubble, 564-4628 Well Number Permit No. / Approval No. iNSTRUCTIONS G£NERAL: This form is designed for submitting a complete and correct well completion report and log on all types of lands and leases in Alaska. ITEM 1: Classification of Service Wells: Gas injection, water injection, steam injection, air injection, salt water disposal, water supply for injection, observation, injection for in-situ combustion. ITEM ,5: Indicate which elevation is used as reference (where not otherwise shown) for depth measurements given in other spaces on this form and in any attachments. ITEM 16 AND 24: If this well is completed for separate production from more than one interval (multiple completion), so state in item 16, and in item 24 show the producing intervals for only the interval reported in item 27. Submit a separate form for each additional interval to be separately produced, showing the data pertinent to such interval. ITEM 21: Indicate whether from ground level (GL) or other elevation (DF, KB, etc.). ITEM 23.' Attached supplemental records for this well should show the details of any multiple stage cementing and the location of the cementing tool. ITEM 27: Method of Operation: Flowing, Gas Lift, Rod Pump, Hydraulic Pump, Submersible, Water Injection, Gas Injection, Shut-In, Other-explain. ITEM 28: If no cores taken, indicate 'none'. Form 10-407 Rev. 07-01-80 Facility Date/Time 28 Feb 97 01 Mar 97 02 Mar 97 03 Mar 97 04 Mar 97 05 Mar 97 06 Mar 97 PBS Pad Progress Report Well S-44 Rig Nabors 18E Duration Activity 06:00-10:00 10:00-17:00 17:00-02:00 02:00-06:00 06:00-07:00 07:00-16:00 16:00-19:30 19:30-06:00 06:00-12:00 12:00-16:30 16:30-19:00 19:00-20:00 20:00-21:00 21:00-22:30 22:30-06:00 06:00-12:00 12:00-12:30 12:30-14:00 14:00-14:30 14:30-15:00 15:00-00:30 00:30-01:00 01:00-01:30 01:30-06:00 06:00-08:00 08:00-09:30 09:30-10:30 10:30-11:30 11:30-13:00 13:00-14:00 14:00-15:30 15:30-22:00 22:00-01:00 O1:00-03:00 03:00-06:00 06:00-07:30 07:30-09:30 09:30-14:30 14:30-20:00 20:00-00:00 00:00-01:30 01:30-02:00 02:00-04:30 04:30-05:00 05:00-06:00 06:00-07:00 07:00-10:30 10:30-11:00 11:00-11:30 11:30-12:30 12:30-13:00 13:00-13:30 13:30-17:00 17:00-17:30 4hr 7hr 9hr 4hr lhr 9hr 3-1/2 hr 10-1/2 hr 6hr 4-1/2 hr 2-1/2 hr lhr lhr 1-1/2 hr 7-1/2 hr 6hr 1/2 hr 1-1/2 hr 1/2hr 1/2 hr 9-1/2 hr 1/2 hr 1/2 hr 4-1/2 hr 2hr 1-1/2 hr lhr lhr 1-1/2 hr lhr 1-1/2 hr 6-1/2 hr 3hr 2hr 3hr 1-1/2 hr 2hr 5hr 5-1/2 hr 4hr 1-1/2 hr 1/2hr 2-1/2 hr 1/2hr lhr lhr 3-1/2 hr 1/2 hr 1/2 hr lhr 1/2 hr 1/2 hr 3-1/2 hr 1/2 hr Rigged down Drillfloor / Derrick Rigged down Drillfloor / Derrick Rigged down Drillfloor / Derrick Rig moved 40.00 % Rig moved 100.00 % (cont...) Rigged up Drillfloor / Derrick Rigged up Drillfloor / Derrick Rigged up Drillfloor / Derrick Rigged up Drillfloor / Derrick (cont...) Rigged up Divertor Made up BHA no. 1 Held safety meeting Tested Well control Repaired Drillfloor / Derrick Drilled to 650.00 ft Drilled to 650.00 ft (cont...) Repaired Rig services Drilled to 1300.00 ft Pulled out of hole to 250.00 ft R.I.H. to 1300.00 ft Drilled to 2388.00 ft Pulled out of hole to 1200.00 ft R.I.H. to 2388.00 ft Drilled to 2900.00 ft Drilled to 3145.00 ft (cont...) Circulated at 3145.00 ft Pulled out of hole to 660.00 ft R.I.H. to 3145.00 ft Circulated at 3145.00 ft Pulled out of hole to 660.00 ft Pulled BI-IA Ran Casing to 3130.00 ft (9-5/8in OD) Circulated at 3130.00 ft Mixed and pumped slurry - 129.000 bbl Circulated at 1772.00 ft Circulated at 1772.00 ft (cont...) Mixed and pumped slurry - 405.000 bbl Rigged down Divertor Rigged up BOP stack Tested BOP stack Made up BI-IA no. 2 Serviced Block line R.I.H. to 3000.00 ft Tested Casing - Via annulus and string Drilled cement to 3047.00 ft Drilled cement to 3145.00 ft (cont...) Circulated at 3145.00 ft Drilled to 3165.00 ft Circulated at 3165.00 ft Performed formation integrity test Circulated at 3165.00 ft Performed formation integrity test Drilled to 3576.00 ft Circulated at 3576.00 ft Page Date 1 09 July 97 Facility Date/Time 07 Mar 97 08 Mar 97 09 Mar 97 10 Mar 97 11 Mar97 12 Mar 97 13 Mar 97 14 Mar 97 PBS Pad Progress Report Well S-44 Rig Nabors 18E Page Date Duration Activity 17:30-18:00 18:00-19:00 19:00-19:30 19:30-06:00 06:00-07:00 07:00-07:30 07:30-08:00 08:00-08:30 08:30-19:30 19:30-20:30 20:30-21:30 21:30-22:00 22:00-23:00 23:00-01:00 01:00-06:00 06:00-16:00 16:00-16:30 16:30-17:30 17:30-18:00 18:00-06:00 06:00-12:00 12:00-12:30 12:30-14:00 14:00-14:30 14:30-04:00 04:00-04:30 04:30-06:00 06:00-07:30 07:30-08:00 08:00-09:00 09:00-09:30 09:30-13:00 13:00-13:30 13:30-14:30 14:30-15:00 15:00-15:30 15:30-06:00 06:00-15:00 15:00-21:00 21:00-00:00 00:00-00:30 00:30-02:00 02:00-06:00 06:00-06:30 06:30-06:00 06:00-14:30 14:30-15:30 15:30-16:30 16:30-20:00 20:00-02:30 02:30-03:30 03:30-04:30 04:30-06:00 06:00-21:30 112 hr lhr 1/2 hr 10-1/2 hr lhr 1/2 hr 1/2 hr 1/2hr llhr lhr lhr 1/2 hr lhr 2hr 5hr 10hr 1/2 hr lhr 1/2 hr 12hr 6hr 1/2 hr 1-1/2 hr 1/2 hr 13-1/2 hr 1/2 hr 1-1/2 hr 1-1/2 hr 1/2 hr lhr 1/2 hr 3-1/2 hr 1/2 hr lhr 1/2 hr 1/2 hr 14-1/2 hr 9hr 6hr 3hr 1/2hr 1-1/2 hr 4hr 1/2 hr 23-1/2 hr 8-1/2 hr lhr lhr 3-1/2 hr 6-1/2 hr lhr lhr 1-1/2 hr 15-1/2 hr Pulled out of hole to 3130.00 ft Performed formation integrity test R.I.H. to 3576.00 ft Drilled to 4503.00 ft Drilled to 4575.00 ft (cont...) Circulated at 4575.00 ft Pulled out of hole to 3130.00 ft R.I.H. to 3145.00 ft Drilled to 5165.00 ft Circulated at 5165.00 ft Pulled out of hole to 218.00 ft Pulled BHA Made up BHA no. 3 R.I.H. to 5165.00 ft Drilled to 5512.00 ft Drilled to 6624.00 ft (cont...) Circulated at 6624.00 ft Pulled out of hole to 5100.00 ft R.I.H. to 6624.00 ft Drilled to 7650.00 ft Drilled to 8000.00 ft (cont...) Circulated at 8000.00 ft Pulled out of hole to 6500.00 ft R.I.H. to 8000.00 ft Drilled to 8997.00 ft Circulated at 8997.00 ft Pulled out of hole to 6951.00 ft Pulled out of hole to 204.00 ft (cont...) Pulled BI-IA Made up BHA no. 4 Serviced Brake R.I.H. to 5361.00 ft Held safety meeting R.I.H. to 8997.00 ft Drilled to 9014.00 ft Serviced' M.W.D. tool Drilled to 9324.00 ft Drilled to 9605.00 ft (cont...) Circulated at 9605.00 ft Pulled out of hole to 204.00 ft Pulled BHA Made up BHA no. 5 R.I.H. to 7062.00 ft R.I.H. to 9605.00 ft Drilled to 10012.00 ft Drilled to 10214.00 ft Circulated at 10214.00 ft Pulled out of hole to 8329.00 ft Circulated at 10214.00 ft Pulled out of hole to 670.00 ft Pulled BHA Rigged up Top ram Ran Casing to 200.00 ft (7in OD) Ran Casing to 10203.00 ft (7in OD) 2 09 July 97 Facility Date/Time 15 Mar 97 16 Mar 97 17 Mar 97 18 Mar 97 19 Mar 97 20 Mar 97 21 Mar 97 22 Mar 97 Progress Report PBS Pad Well S-44 Page 3 Rig Nabors 18E Date 09 July 97 21:30-23:00 23:00-23:30 23:30-01:00 01:00-02:00 02:00-03:30 03:30-04:30 04:30-06:00 06:00-07:00 07:00-09:30 09:30-10:30 10:30-12:00 12:00-15:00 15:00-18:00 18:00-05:00 05:00-06:00 06:00-09:30 09:30-10:00 10:00-12:00 12:00-16:30 16:30-17:30 17:30-18:30 18:30-22:30 22:30-06:00 06:00-22:30 22:30-00:00 00:00-00:30 00:30-01:30 01:30-02:00 02:00-06:00 06:00-02:30 02:30-03:00 03:00-05:00 05:00-06:00 06:00-12:00 12:00-13:00 13:00-15:00 15:00-20:00 20:00-21:00 21:00-00:00 00:00-05:30 05:30-06:00 06:00-06:00 06:00-19:30 19:30-20:30 20:30-22:30 22:30-00:00 00:00-01:00 01:00-03:00 03:00-04:00 04:00-05:30 05:30-06:00 06:00-09:00 09:00-10:00 10:00-15:00 Duration 1-1/2 hr 1/2 hr 1-1/2 hr lhr 1-1/2 hr lhr 1-1/2 hr lhr 2-1/2 hr lhr 1-1/2 hr 3hr 3hr llhr lhr 3-1/2 hr 1/2 hr 2hr 4-1/2 hr lhr lhr 4hr 7-1/2 hr 16-1/2 hr 1-1/2 hr 1/2hr lhr 1/2 hr 4hr 20-1/2 hr 1/2 hr 2hr lhr 6hr lhr 2hr 5hr lhr 3hr 5-1~2hr 1/2 hr 24 hr 13-1/2 hr lhr 2hr 1-1/2 hr lhr 2hr lhr 1-1/2 hr 1/2 hr 3hr lhr 5hr Activity Circulated at 10203.00 ft Held safety meeting Mixed and pumped slurry - 245.000 bbl Displaced slurry - 387.700 bbl Installed Seal assembly Circulated at 3130.00 ft Installed BOP stack Rigged down Kelly Repaired Block line Serviced Block line Rigged up Kelly Tested BOP stack Made up BHA no. 6 Singled in drill pipe to 9960.00 ft Tested Casing - Via string Drilled cement to 10214.00 ft Drilled to 10234.00 ft Circulated at 10234.00 ft Pulled out of hole to 220.00 ft Pulled BHA Made up BI-IA no. 7 R.I.H. to 10234.00 ft Drilled to 10470.00 ft Drilled to 11150.00 ft Circulated at 11150.00 ft Pulled out of hole to 10185.00 ft Circulated at 10185.00 ft R.I.H. to 11150.00 ft Drilled to 11217.00 ft Drilled to 11895.00 ft Circulated at 11850.00 ft Rest hole at 10895.00 ft Drilled to 11919.00 ft Drilled to 12023.00 ft Worked toolstring at 12023.00 ft Circulated at 12023.00 ft Pulled out of hole to 260.00 ft Pulled BHA Made up BHA no. 8 R.I.H. to 12004.00 ft Drilled to 12053.00 ft Drilled to 12740.00 ft (cont...) Drilled to 13150.00 ft (cont...) Circulated at-13150.00 ft Pulled out of hole to 9570.00 ft Logged hole with LWD: DIR/FE/DD from 9577.00 ft to 9480.00 ft R.I.H. to 13150.00 ft Circulated at 13150.00 ft Pulled out of hole to 10200.00 ft Circulated at 10200.00 ft Pulled out of hole to 8000.00 ft Pulled out of hole to 250.00 ft (cont...) Pulled BHA Ran Liner to 3190.00 ft (4-1/2in OD) Facility Date/Time 23 Mar 97 24 Mar 97 25 Mar 97 26 Mar 97 27 Mar 97 28 Mar 97 29 Mar 97 PBS Pad Progress Report Well S-44 Page 4 Rig Nabors 18E Date 09 July 97 Duration Acfivi~ 15:00-15:30 15:30-22:30 22:30-23:30 23:30-01:00 01:00-02:30 02:30-03:30 03:30-04:30 04:30-06:00 06:00-09:00 09:00-11:30 11:30-12:00 12:00-14:00 14:00-18:00 18:00-23:30 23:30-01:00 01:00-01:30 01:30-03:00 03:00-04:30 04:30-05:00 05:00-06:00 06:00-12:00 12:00-13:00 13:00-16:00 16:00-19:30 19:30-00:30 00:30-06:00 06:00-06:30 06:30-08:30 08:30-09:00 09:00-10:00 10:00-11:30 11:30-15:30 15:30-17:00 17:00-01:30 01:30-03:30 03:30-06:00 06:00-06:15 06:15-07:00 07:00-08:00 08:00-10:00 10:00-13:30 13:30-14:30 14:30-06:00 06:00-13:30 13:30-15:00 15:00-17:00 17:00-18:00 18:00-21:30 21:30-22:30 22:30-00:00 00:00-03:00 03:00-06:00 06:00-06:00 06:00-08:00 1/2 hr 7hr lhr 1-1/2 hr 1-1/2 hr lhr lhr 1-1/2 hr 3hr 2-1/2 hr 1/2 hr 2hr 4hr 5-1/2 hr 1-1/2 hr 1/2 hr 1-1/2 hr 1-1/2 hr 1/2 hr lhr 6hr lhr 3hr 3-1/2 hr 5hr 5-1/2 hr 1/2 hr 2hr 1/2 hr lhr 1-1/2 hr 4hr 1-1/2 hr 8-1/2 hr 2hr 2-1/2 hr 1/4 hr 3/4 hr lhr 2hr 3-1/2 hr lhr 15-1/2 hr 7-1/2 hr 1-1/2 hr 2hr lhr 3-1/2 hr lhr 1-1/2 hr 3hr 3hr 24 hr 2hr Circulated at 3190.00 ft Ran Liner on landing string to 13137.00 ft Circulated at 10926.00 fi Functioned Inflatable packer Circulated at 10875.00 ft Mixed and pumped slurry - 27.000 bbl Reverse circulated at 9945.00 ft Pulled Drillpipe in stands to 9000.00 ft Pulled Drillpipe in stands to 0.00 ft (cont...) Ran Drillpipe in stands to 2900.00 ft Serviced Block line Laid down 2900.00 ft of 3-1/2in OD drill pipe Tested BOP stack Made up BHA no. 9 R.I.H. to 7000.00 ft Held drill (Kick (well kill)) R.I.H. to 10760.00 ft Drilled cement to 10855.00 ft Tested Liner - Via annulus and string Drilled cement to 10875.00 ft Drilled cement to 10875.00 ft (cont...) R.I.H. to 13127.00 ft Circulated at 13127.00 ft Pulled out of hole to 3400.00 ft Pulled BHA Conduct braided cable operations - 5/16 size cable Conducted electric cable operations Made up BHA no. 1 R.I.H. to 1000.00 ft Functioned Survey instruments Pulled out of hole to 115.00 ft R.I.H. to 9496.00 ft Set tool face Cut Casing at 9506.00 ft Circulated at 9535.00 ft Pulled out of hole to 2000.00 ft Pulled out of hole to 400.00 ft (cont...) Pulled BI-IA Functioned BOP stack Made up BI-IA no. 11 R.I.H. to 9520.00 ft Set tool face Drilled to 9933.00 ft Drilled to 10172.00 ft (cont...) Took MWD survey at 9826.00 ft Drilled to 10190.00 ft Circulated at 10190.00 ft Pulled out of hole to 10190.00 ft Pulled BHA Made up BHA no. 12 R.I.H. to 10190.00 ft Drilled to 10250.00 ft Drilled to 10807.00 ft (cont...) Drilled to 10845.00 ft (cont...) Facility Date/Time 30 Mar 97 31 Mar 97 01 Apr 97 02 Apr 97 03 Apr 97 04 Apr 97 PBS Pad Progress Report Well S-44 Rig Nabors 18E Duration Activity 08:00-10:30 10:30-14:30 14:30-15:30 15:30-16:30 16:30-18:00 18:00-21:30 21:30-00:00 00:00-06:00 06:00-13:30 13:30-14:30 14:30-18:00 18:00-20:30 20:30-22:30 22:30-03:30 03:30-04:30 04:30-06:00 06:00-08:00 08:00-09:30 09:30-10:00 10:00-10:30 10:30-15:00 15:00-15:30 15:30-17:30 17:30-06:00 06:00-16:00 16:00-18:30 18:30-22:00 22:00-23:00 23:00-01:00 01:00-04:30 04:30-05:00 05:00-06:00 06:00-06:30 06:30-10:00 10:00-11:00 11:00-11:30 11:30-17:00 17:00-18:00 18:00-19:00 19:00-20:00 20:00-21:00 21:00-06:00 06:00-23:00 23:00-00:00 00:00-01:30 01:30-02:00 02:00-03:00 03:00-03:30 03:30-06:00 06:00-13:00 13:00-13:30 13:30-14:00 14:00-16:00 16:00-23:00 2-1/2 hr 4hr liar Ilar 1-1/2 hr 3-1/2 hr 2-1/2 hr 6hr 7-1/2 hr lhr 3-1/2 hr 2-1/2 hr 2hr 5hr lhr 1-1/2 hr 2hr 1-1/2 hr 1/2 hr 1/2 hr 4-1/2 hr 1/2 hr 2hr 12-1/2 hr 10hr 2-1/2 hr 3-1/2 hr lhr 2hr 3-1/2 hr 1/2 hr lhr 1/2 hr 3-1/2 hr lhr 1/2 hr 5-1/2 hr lhr lhr lhr lhr 9hr 17 hr lhr 1-1/2 hr 1/2 hr lhr 1/2 hr 2-1/2 hr 7hr 1/2hr 1/2hr 2hr 7hr Reamed to 10807.00 ft Pulled out of hole to 234.00 ft Pulled BHA Serviced Other sub-surface equipment Made up BHA no. 13 R.I.H. to 10324.00 ft Reamed to 10344.00 ft Drilled to 10350.00 ft Drilled to 10366.00 ft (cont...) Reamed to 10340.00 ft Reamed to 10366.00 ft Drilled to 10366.00 ft Circulated at 10413.00 ft Pulled out of hole to 220.00 ft Pulled BHA Tested BOP stack Tested BOP stack (cont...) Made up BHA no. 14 R.I.H. to 1000.00 ft Serviced Block line R.I.H. to 9485.00 ft Tested Kelly cocks R.I.H. to 10313.00 ft Drilled to 10674.00 ft Drilled to 11035.00 ft (cont...) Circulated at 11035.00 ft Pulled out of hole to 240.00 ft Pulled BHA Rigged up Kelly Made up BI-IA no. 15 R.I.H. to 1400.00 ft Pulled out of hole to 100.00 ft Pulled out of hole to 100.00 ft (cont...) R.I.H. to 10344.00 ft Washed to 10400.00 ft R.I.H. to 11035.00 ft Drilled to 11232.00 ft Circulated at 11232.00 ft Pulled out of hole to 9440.00 ft Flow check R.I.H. to 11232.00 ft Drilled to 11447.00 ft Drilled to 11848.00 ft Rest hole at 11848.00 ft Circulated at 11648.00 ft Pulled out of hole to 10800.00 ft Flow check R.I.H. to 11848.00 ft Drilled to 11921.00 ft Drilled to 12217.00 ft Rest hole at 12217.00 ft Drilled to 12220.00 ft Circulated at 12220.00 ft Pulled out of hole to 0.00 ft Page Date 5 09 July 97 Facility Date/Time 05 Apr 97 06 Apr 97 07 Apr 97 08 Apr 97 09 Apr 97 10 Apr 97 11 Apr 97 PBS Pad Progress Report Well S-44 Rig Nabors 18E Page Date Duration Activity 23:00-00:30 00:30-04:00 04:00-05:00 05:00-06:00 06:00-06:30 06:30-07:30 07:30-10:00 10:00-16:00 16:00-04:30 04:30-06:00 06:00-07:30 07:30-09:00 09:00-10:00 10:00-14:30 14:30-20:30 20:30-22:30 22:30-02:30 02:30-06:00 06:00-08:30 08:30-11:30 11:30-12:00 12:00-13:00 13:00-13:30 13:30-14:00 14:00-17:30 17:30-18:30 18:30-21:00 21:00-00:00 00:00-03:30 06:00-08:00 08:00-08:30 08:30-10:00 10:00-12:00 12:00-16:00 16:00-02:00 02:00-04:30 04:30-06:00 06:00-12:00 12:00-20:00 20:00-23:00 23:00-00:00 00:00-00:30 00:30-02:30 02:30-03:00 03:00-06:00 06:00-10:30 10:30-12:30 12:30-00:00 00:00-06:00 06:00-10:30 10:30-13:00 13:00-14:00 14:00-15:00 15:00-17:30 1-1/2 hr 3-1/2 hr lhr lhr 1/2 hr lhr 2-1/2 hr 6hr 12-1/2 hr 1-1/2 hr 1-1/2 hr 1-1/2 hr lhr 4-1/2 hr 6hr 2hr 4hr 3-1/2 hr 2-1/2 hr 3hr 1/2 hr lhr 1/2 hr 1/2 hr 3-1/2 hr lhr 2-1/2 hr 3hr 3-1/2 hr 2hr 1/2 hr 1-1/2 hr 2hr 4hr 10hr 2-1/2 hr 1-1/2 hr 6hr 8hr 3hr lhr 1/2 hr 2hr 1/2hr 3hr 4-1/2 hr 2hr 11-1/2 hr 6hr 4-1/2 hr 2-1/2 hr lhr lhr 2-1/2 hr Pulled BHA Made up BI-IA no. 16 Pulled out of hole to 93.00 fl R.I.H. to 200.00 ft Serviced M.W.D. tool R.I.H. to 1000.00 ft Pulled out of hole to 90.00 ft R.I.H. to 12220.00 ft Drilled to 12486.00 ft Circulated at 12360.00 ft Circulated at 12385.00 ft Pulled out of hole to 9506.00 fl R.I.H. to 12385.00 ft Circulated at 12385.00 fi Pulled out of hole to 0.00 fl Pulled BHA Ran Liner to 2900.00 ft (4-1/2in OD) Ran Tubing to 2400.00 fl (2-1/16in OD) Ran Tubing to 2800.00 fl (2-1/16in OD) Ran Drillpipe on landing string to 9506.00 ft Circulated at 9506.00 fl Ran Liner in stands to 12373.00 ft Circulated at 12373.00 fl Set Liner hanger at 12373.00 fl with 20.0 psi Circulated at 12373.00 fl Pulled Drillpipe in stands to 9506.00 fl Circulated at 9506.00 fl Pulled Drillpipe in stands to 2800.00 fl Laid down 2800.00 fl of Tubing Made up BHA no. 17 Serviced Block line R.I.H. to 9476.00 ft Set tool face Fished at 9516.00 fl Jarred stuck pipe at 9516.00 fl Conducted electric cable operations Fished at 9516.00 ft Fished at 9516.00 fl (cont...) Conducted electric cable operations Pulled out of hole to 635.00 fl Pulled BI-IA Serviced Other sub-surface equipment Made up BHA no. 18 Serviced Block line R.I.H. to 9477.00 ft Jarred stuck pipe at 9516.00 ft Rig waited' Equipment Conducted electric cable operations Conducted electric cable operations Conducted electric cable operations Pulled out of hole to 636.00 ft Pulled BHA Made up BHA no. 19 R.I.H. to 9466.00 fl 6 09 July 97 Facility Date/Time 12 Apr 97 13 Apr 97 14 Apr 97 15 Apr 97 16 Apr 97 Progress Report PBS Pad Well S-44 Rig Nabors 18E Page Date 17:30-23:30 23:30-02:30 02:30-03:30 03:30-04:30 04:30-06:00 06:00-08:30 08:30-16:30 16:30-19:30 19:30-20:00 20:00-21:30 21:30-00:30 00:30-01:00 01:00-05:00 05:00-06:00 06:00-09:30 09:30-13:00 13:00-14:00 14:00-17:00 17:00-17:30 17:30-21:30 21:30-22:00 22:00-23:00 23:00-01:30 01:30-02:30 02:30-04:30 04:30-06:00 06:00-14:00 14:00-19:00 19:00-22:30 22:30-03:30 03:30-06:00 06:00-07:00 07:00-07:30 07:30-08:00 08:00-09:00 09:00-11:00 11:00-11:30 11:30-12:30 12:30-13:30 13:30-19:30 19:30-22:30 22:30-23:00 23:00-23:30 23:30-02:30 02:30-05:30 05:30-06:00 06:00-09:30 09:30-10:00 10:00-12:00 12:00-15:00 15:00-17:00 17:00-20:30 20:30-21:00 21:00-21:30 Duration 6 hr 3 hr lhr lhr 1-1/2 hr 2-1/2 hr 8hr 3hr 1/2 hr 1-1/2 hr 3hr 1/2 hr 4hr lhr 3-1/2 hr 3-1/2 hr lhr 3hr 1/2 hr 4hr 1/2 hr lhr 2-1/2 hr lhr 2hr 1-1/2 hr 8hr 5hr 3-1/2 hr 5hr 2-1/2 hr lhr 1/2 hr 1/2 hr lhr 2hr 1/2 hr lhr lhr 6hr 3hr 1/2 hr 1/2 hr 3hr 3hr 1/2 hr 3-1/2 hr 1/2 hr 2hr 3hr 2hr 3-1/2 hr 1/2 hr 1/2 hr Activity Washed over string at 9505.00 ft Pulled out of hole to 634.00 ft Pulled BHA Made up BHA no. 20 R.I.H. to 5000.00 fi R.I.H. to 9481.00 ft Washed over string at 9515.00 ft Pulled out of hole to 850.00 ft Pulled BHA Made up BHA no. 21 R.I.H. to 9481.00 ft Jarred stuck pipe at 9481.00 ft Pulled out of hole to 60.00 ft Laid down fish R.I.H. to 9508.00 ft Pulled out of hole to 60.00 ft Pulled BHA R.I.H. to 9508.00 ft Fished at 9508.00 ft Pulled out of hole to 60.00 ft Pulled BHA Made up BHA no. 23 R.I.H. to 3000.00 ft Serviced Block line R.I.H. to 9508.00 ft Fished at 9508.00 ft Circulated at 9508.00 ft Conducted electric cable operations Filter Seawater Conducted electric cable operations Pulled out of hole to 4000.00 ft ..... Pulled out of hole to 60.00 ft (cont...) Pulled BHA Serviced Drillfloor / Derrick Made up BHA no. 24 R.I.H. to 6000.00 ft Held safety meeting R.LH. to 9506.00 fi Circulated at 9506.00 ft Milled Downhole tools at 9509.00 ft Pulled out of hole to 60.00 ft Pulled BHA Made up BI-IA no. 25 R.I.H. to 9506.00 ft Milled Downhole tools at 9509.00 ft Circulated at 9506.00 ft Pulled out of hole to 851.00 ft Pulled BHA Made up BHA no. 26 R.I.H. to 9510.00 ft Fished at 9510.00 ft Pulled out of hole to 847.00 ft Pulled BHA Made up BHA no. 27 7 09 July 97 Facility Date/Time 17 Apr 97 18 Apr 97 19 Apr 97 20 Apr 97 21 Apr 97 22 Apr 97 PBS Pad Progress Report Well S-44 Rig Nabors 1SE Duration Activity 21:30-02:30 02:30-05:30 05:30-06:00 06:00-14:00 14:00-16:30 16:30-17:00 17:00-17:15 17:15-19:30 19:30-06:00 06:00-08:30 08:30-11:30 11:30-11:45 11:45-12:00 12:00-14:00 14:00-15:00 15:00-15:30 15:30-22:30 22:30-02:30 02:30-03:00 03:00-04:00 04:00-06:00 06:00-06:30 06:30-09:00 09:00-09:30 09:30-10:00 10:00-14:30 14:30-23:30 23:30-02:00 02:00-03:00 03:00-04:00 04:00-06:00 06:00-06:30 06:30-18:00 18:00-20:30 20:30-20:45 20:45-21:00 21:00-23:00 23:00-00:30 00:30-01:30 01:30-03:30 03:30-06:00 06:00-06:30 06:30-07:00 07:00-07:30 07:30-10:30 10:30-11:00 11:00-14:30 14:30-15:00 15:00-16:00 16:00-21:30 21:30-01:00 01:00-02:30 02:30-05:00 05:00-06:00 5 hr 3hr 1/2 hr 8hr 2-1/2 hr 1/2 hr 1/4 hr 2-1/4 hr 10-1/2 hr 2-1/2 hr 3hr 1/4 hr 1/4 hr 2hr lhr 1/2 hr 7hr 4hr 1/2 hr lhr 2hr 1/2 hr 2-1/2 hr 1/2 hr 1/2 hr 4-1/2 hr 9hr 2-1/2 hr lhr lhr 2hr 1/2 hr 11-1/2 hr 2-1/2 hr 1/4 hr 1/4 hr 2hr 1-1/2 hr lhr 2hr 2-1/2 hr 1/2 hr 1/2hr 1/2 hr 3hr 1/2 hr 3-1/2 hr 1/2hr lhr 5-1/2 hr 3-1/2 hr 1-1/2 hr 2-1/2 hr lhr Tested BOP stack R.I.H. to 9482.00 ft Milled Downhole tools at 9509.00 ft Milled Downhole tools at 9509.50 fi (cont...) Pulled out of hole to 860.00 ft Pulled BHA Made up BHA no. 28 R.I.H. to 9484.00 ft Milled Downhole tools at 9511.00 ft Milled Downhole tools at 9511.00 ft (cont...) Pulled out of hole to 300.00 ft Pulled BHA Made up BHA no. 29 R.I.H. to 7000.00 ft Serviced Block line R.I.H. to 9509.00 ft Milled Downhole tools at 9512.00 ft Pulled out of hole to 800.00 ft Pulled BHA Made up BHA no. 30 R.I.H. to 9473.00 fi Fished at 9506.00 ft Pulled out of hole to 300.00 ft Pulled BHA Removed Handling equipment Made up BHA no. 31 Milled Downhole tools at 9511.00 ft Pulled out of hole to 250.00 ft Pulled BHA Made up BHA no. 31 R.I.H. to 9480.00 ft R.I.H. to 9480.00 ft (cont...) Milled Downhole tools at 9518.00 ft Pulled out of hole to 300.00 ft Pulled BHA Made up BHA no. 32 R.I.H. to 9487.00 ft Reamed to 9518.00 ft Milled Downhole tools at 9524.00 ft Circulated at 9524.00 ft Pulled out of hole to 300.00 ft Pulled BHA Serviced Other sub-surface equipment Made up BHA no. 34 R.I.H. to 9498.00 ft Fished at 9510.00 fi Pulled out of hole to 300.00 ft Pulled BHA Serviced Block line Made up BHA no. 35 R.I.H. to 9452.00 ft Fished at 9509.00 ft Pulled out of hole to 300.00 ft Pulled BHA Page Date 8 09 July 97 Facility Date/Time 23 Apr 97 24 Apr 97 25 Apr 97 26 Apr 97 27 Apr 97 28 Apr 97 Progress Report PBS Pad Well S-44 Page 9 Rig Nabors 18E Date 09 July 97 06:00-07:00 07:00-09:30 09:30-14:00 14:00-14:30 14:30-17:30 17:30-18:30 18:30-23:00 23:00-00:00 00:00-02:30 02:30-06:00 06:00-16:00 16:00-19:00 19:00-19:30 19:30-20:30 20:30-23:00 23:00-23:30 23:30-00:00 00:00-00:30 00:30-02:30 02:30-06:00 06:00-19:30 19:30-22:30 22:30-23:00 23:00-02:00 02:00-06:00 06:00-09:30 09:30-10:30 10:30-15:00 15:00-20:30 20:30-23:00 23:00-00:00 00:00-06:00 06:00-06:30 06:30-07:00 07:00-10:00 10:00-11:00 11:00-12:00 12:00-22:30 22:30-23:00 23:00-02:30 02:30-06:00 06:00-09:00 09:00-12:30 12:30-13:00 13:00-13:30 13:30-14:00 14:00-16:00 16:00-02:30 02:30-03:30 03:30-06:00 06:00-06:15 06:15-06:30 06:30-07:00 07:00-09:30 Duration 1 hr 2-1/2 hr 4-1/2 hr 1/2 hr 3hr lhr 4-1/2 hr lhr 2-1/2 hr 3-1/2 hr 10hr 3hr 1/2 hr lhr 2-1/2 hr 1/2 hr 1/2 hr 1/2 hr 2hr 3-1/2 hr 13-1/2 hr 3hr 1/2 hr 3hr 4hr 3-1/2 hr lhr 4-1/2 hr 5-1/2 hr 2-1/2 hr lhr 6hr 1/2 hr 1/2hr 3hr lhr lhr 10-1/2 hr 1/2 hr 3-1/2 hr 3-1/2 hr 3hr 3-1/2 hr 1/2 hr 1/2 hr 1/2 hr 2hr 10-1/2 hr lhr 2-1/2 hr 1/4 hr 1/4 hr 1/2 hr 2-1/2 hr Activity Made up BHA no. 36 R.I.H. to 9511.00 ft Milled Other sub-surface equipment at 9513.00 ft Circulated at 9512.00 ft Pulled out of hole to 300.00 ft Pulled BHA Rig waited: Equipment Made up BHA no. 37 R.I.H. to 9505.00 ft Milled Other sub-surface equipment at 9508.00 ft Milled Other sub-surface equipment at 9510.50 ft (cont...) Pulled out of hole to 300.00 ft Pulled BI-IA Removed Bore protector Tested BOP stack Made up BI-IA no. 38 R.I.H. to 800.00 fi Tested Mud motor - Via string R.I.H. to 9484.00 ft Milled Downhole tools at 9513.00 ft Milled Downhole tools at 9512.00 ft (cont...) Pulled out of hole to 300.00 ft Pulled BHA R.I.H. to 9520.00 ft Filter Seawater Filter Seawater (cont...) Rigged up Logging/braided cable equipment Operate camera - 2in ID Conducted slickline operations on Slickline equipment - Tool run Operate camera - 2in ID Circulated at 9400.00 ft Operate camera - 2in ID Operate camera - 2in ID (cont...) Conducted electric cable operations Pulled out of hole to 0.00 ft Made up BI-IA no. 39 Serviced Bore protector Rig waited: Equipment Made up BI-IA no. 39 R.I.H. to 9503.00 fi Milled Downhole tools at 9505.00 ft Milled Downhole tools at 9505.40 ft (cont...) Pulled out of hole to 0.00 ft Pulled BHA Made up BI-IA no. 40 Serviced Block line R.I.H. to 9507.00 ft Milled Downhole tools at 9511.00 ft Circulated at 9511.00 ft Pulled out of hole to 300.00 ft Pulled out of hole to 300.00 ft (cont...) Pulled BHA Made up BHA no. 41 R.LH. to 9510.00 ft Facility Date/Time 29 Apr 97 30 Apr 97 01 May 97 02 May 97 Progress Report PBS Pad Well S-44 Rig Nabors 18E Page Date 09:30-10:30 10:30-16:30 16:30-17:30 17:30-19:45 19:45-20:00 20:00-20:30 20:30-23:00 23:00-06:00 06:00-08:30 08:30-09:30 09:30-12:00 12:00-12:15 12:15-12:30 12:30-15:30 15:30-05:00 05:00-06:00 06:00-08:00 08:00-08:30 08:30-10:00 10:00-10:30 10:30-14:30 14:30-15:00 15:00-18:30 18:30-20:00 20:00-20:30 20:30-22:30 22:30-02:30 02:30-05:30 05:30-06:00 06:00-07:00 07:00-09:30 09:30-10:00 10:00-11:00 11:00-12:30 12:30-13:00 13:00-13:30 13:30-01:00 01:00-02:00 02:00-02:30 02:30-03:00 03:00-03:30 03:30-04:00 04:00-05:00 05:00-06:00 06:00-07:00 07:00-10:00 10:00-10:30 10:30-11:30 11:30-16:00 16:00-17:00 Duration liar 6hr lhr 2-1/4 hr 1/4 hr 1/2 hr 2-1/2 hr 7hr 2-1/2 hr lhr 2-1/2 hr 1/4 hr 1/4 hr 3hr 13-1/2 hr lhr 2hr 1/2 hr 1-1/2 hr 1/2 hr 4hr 1/2 hr 3-1/2 hr 1-1/2 hr 1/2 hr 2hr 4hr 3hr 1/2 hr lhr 2-1/2 hr 1/2hr lhr 1-1/2 hr 1/2 hr 1/2hr 11-1/2 hr lhr 1/2 hr 1/2 hr 1/2 hr 1/2 hr lhr lhr lhr 3hr 1/2 hr lhr 4-1/2 hr lhr Activity Milled Downhole tools at 9511.00 ft Milled Downhole tools at 9512.00 ft Circulated at 9512.00 ft Pulled out of hole to 300.00 ft Pulled BHA Made up BHA no. 42 R.I.H. to 9512.00 ft Milled Downhole tools at 9513.50 ft Milled Downhole tools at 9513.80 ft (cont...) Circulated at 9512.00 ft Pulled out of hole to 300.00 ft Pulled BHA Made up BHA no. 43 R.I.H. to 9512.00 ft Milled Downhole tools at 9514.00 ft Circulated at 9514.00 ft Pulled out of hole to 798.00 ft Pulled BHA Rig waited: Orders Made up BI-IA no. 44 R.I.H. to 9512.00 ft Fished at 9514.00 ft Pulled out of hole to 772.00 ft Pulled BHA Made up BHA no. 45 R.I.H. to 9505.00 ft Circulated at 9505.00 ft Pulled out of hole to 0.00 ft Rigged down Kelly Rigged down Kelly (cont...) Laid down 4357.00 ft of 3-1/2in OD drill pipe Serviced Block line Laid down 1443.00 ft of 3-1/2in OD drill pipe Rigged up Top ram Installed Tubing handling equipment Held safety meeting Ran Tubing to 9292.85 ft (4-1/2in OD) Reverse circulated at 9292.85 ft Set packer at 9235.85 ft with 4000.0 psi Tested Tubing Tested Permanent packer Installed Hanger plug Rigged up Pipe ram Removed BOP stack Removed BOP stack (cont...) Installed Xmas tree Tested Xmas tree Removed Hanger plug Freeze protect well - 77.000 bbl of Diesel Rigged up Hanger plug 10 09 July 97 Operator BP Exploration Performance Enquiry Report Date 15:40, 13 Aug 97 Page 1 The analysis is fi.om - 12:30, 06 Mar 97 - to - 19:00, 06 Mar 97 Programs in Result Table: S-44 Multi Lateral Well Type Time From Time To S-44 Event 12:30, 06 Mar 97 12:30, 06 Mar 97 S-44 Event 13:30, 06 Mar 97 13:30, 06 Mar 97 S-44 Event 19:00, 06 Mar 97 19:00, 06 Mar 97 Duration Description 0 hr 0 min Obtained leak off 0 hr 0 min Obtained leak off 0 hr 0 min Obtained leak off E.M.W.(equivalent mud weight) 14.300 14.300 14.300 Hole Size MDR 8-1/2 8-1/2 8-1/2 ANADRILL Survey Report Client Field BP Exploration Prudhoe Bay ORIGINAL Well AFE Number Job Number Rig County State S-44 Lla 4P0855 39498 Nabors 18E North Slope Alaska Spud Date Engineer 2-Mar-97 Craig Brown Survey Calculation Calc. method for positions: Calc. method for DLS: Minimum curvature Mason & Taylor Depth References Permanent datum: Depth reference: GL above permanent datum: KB above permanent datum: DF above permanent datum: Mean Sea Level RKB 36.5ft 67.0 ft 65.5 ft Vertical Section Origin Latitude (+N/S-) 309.57 ft Departure (+E/W-) -2514.74 ft Geomagnetic Data Magnetic Model: Magnetic Date: Magnetic Field Strength: Magnetic Dec (+E/W-) Magnetic Dip: BGGM 1996 version 2-Mar-97 1145.0 HCNT 28.37 degrees 80.71 degrees MWD Survey Criteria Reference G: Reference H: Reference Dip: Tolerance of G: Tolerance of H: Tolerance of Dip: 1002.70 milliG 1145.00 HCNT 80.71 degrees (+/-) 3.00 milliG (+/-) 7.00 HCNT (+/-) 0.30 degrees Platform Reference Point Latitude (+N/S-) 70.355 N Departure (+E/W-) 149.034 W Target Azimuth from 'rotary table: 280 degrees Correction ~'.. ~;~., Magnetic Dec ...... Survey Measured Incl Azimuth # Depth angle angle (ft) (deg) (deg) Course TVD Vertical length depth section (ft) (ft) (ft) Displacement +N/S- +E/W- (ft) (ft) Closure DLS Srvy displ azim (degl tool (ft) (deg) 100f) type I 0.00 0.00 2 159.00 0.21 3 261.06 0.13 4 352.48 0.27 5 443.04 0.25 6 534.54 0.47 7 626.31 0.51 8 719.48 0.72 9 808.25 0.69 10 902.46 0.85 11 991.64 1.10 12 1084.38 1.16 13 1177.21 1.28 14 1273.96 0.93 15 1367.60 0.86 0.00 0.00 0.00 0.00 32.30 159.00 159.00 -0.11 355.90 102.10 261.10 -0.15 22.00 91.40 352.50 -0.17 324.50 90.50 443.00 -0.08 337.20 91.50 534.50 3.70 91.80 626.29 7.30 93.20 719.49 0.10 88.70 808.18 22.40 94.30 902.47 12.70 21.20 15.00 303.10 287.80 89.10 991.56 92.80 1084.34 92.80 1177.12 96.80 1273.91 93.60 1367.49 0.00 0.00 0.00 0.00 0.00 0.25 0.16 0.29 32.30 0.13 0.52 0.25 0.58 25.44 0.13 0.82 0.32 0.88 21.29 0.18 1.18 0.29 1.22 13.60 0.28 0.27 1.69 0.02 1.69 0.83 0.25 0.52 2.44 -0.10 2.45 357.77 0.25 0.59 3.44 0.01 3.44 0.10 0.23 0.71 4.53 0.08 4.53 0.99 0.11 0.66 5.74 0.35 5.75 3.44 0.36 0.47 7.19 0.79 7.23 6.24 0.34 0.25 8.93 1.32 9.03 8.41 0.19 -0.02 10.81 1.93 10.98 10.12 0.19 0.61 12.28 1.55 12.38 7.20 1.37 2.00 12.91 0.25 12.91 1.09 0.27 Page 1 TIP MWD MWD MWD MWD MWD MWD MWD MWD MWD MWD MWD MWD MWD MWD ,rvey Measured Depth (ft) lncl angle (deg) 16 17 18 19 2O 1462.41 1557.57 1649.62 1743.27 1836.09 0.91 0.87 0.95 1.56 1.63 21 22 23 24 25 1927.84 2020.30 2114.20 2207.58 2300.19 1.57 1.57 1.41 1.05 1.03 26 27 28 29 30 2394.29 2487.45 2581.19 2678.35 2770.30 0.65 0.69 0.57 0.58 0.47 31 32 33 34 35 2865.89 2958.55 3051.49 3089.46 3234.50 0.32 0.27 0.15 0.27 0.27 36 37 38 39 4O 3328.68 3420.70 3514.24 3608.09 3704.20 0.17 0.03 0.04 0.20 0.56 41 42 43 44 45 3798.73 3891.42 3979.79 4078.66 4170.97 0.51 0.50 0.69 0.71 1.22 46 47 48 49 5O 4263.78 4356.02 4451.60 4544.88 4639.21 4.02 7.07 10.10 12.43 14.36 51 52 53 54 55 4733.06 4828.36 4921.48 5015.00 5109.28 16.02 17.77 19.34 21.91 24.70 56 57 58 59 60 5202.71 5296.97 5389.68 5483.90 5578.71 26.91 28.73 29.04 28.78 28.84 Azimuth angle (deg) Course length (ft) 294.90 286.50 282.60 217.10 215.70 94.80 95.20 92.00 93.70 92.80 215.90 213.10 218.20 186.90 192.90 91.70 92.50 93.90 93.40 92.60 152.10 131.20 128.70 141.00 128.90 94,10 93.20 93.70 97.10 92.0O 128.10 131.30 169.00 171.20 191.80 95.60 92.60 93.00 38.00 145.00 199.60 192.80 285.70 95.4O 122.40 94.20 92.00 93.50 93.90 96.10 125.90 124.90 114.40 126.30 299.60 94.50 92.70 88.40 98.90 92.30 295.50 291.40 287.00 286.90 283.30 92.80 92.20 95.60 93.30 94.30 283.50 282.60 277.90 275.80 274.4O 93.90 95.30 93.10 93.50 94.3O 273.90 276.80 276.80 275.60 274.00 93.40 94.30 92.70 94.20 94.80 TVD depth fit) Vertical Displacement section +N/S- +E/W- fit) (ft) (ft) 1462.28 3.43 13.45 -1.11 1557.47 4.88 13.97 -2,49 1649.46 6.34 14.33 -3.91 1743.14 7.69 13.49 -5.44 1835.90 8.84 11.41 -6.97 1927.57 2020.03 2113.90 2207.28 2299.87 9.96 11.01 12.06 12.55 12.55 9.33 -8.46 7.24 -9.90 5.26 -11.32 3.50 -12.13 1.85 -12.42 2393.96 12.27 0.55 -12.36 2487.15 11.46 -0.28 -11.69 2580.84 10.57 -0.95 -10.90 2677.94 9.77 -1.63 -10.21 2769.94 9.09 -2.23 -9.63 2865.53 8.51 -2.64 -9.11 2958.13 8.10 -2.94 -8.74 3051.13 7.87 -3.21 -8.56 3089.13 7.82 -3.34 -8.53 3234.13 7.72 -4.02 -8.55 3328.33 7.75 -4.37 -8.64 3420.33 7.78 -4.52 -8.69 3513.83 7.81 -4.53 -8.73 3607.73 7.68 -4.54 -8.60 3703.83 7.08 -4.81 -8.04 3798.32 6.27 -5.30 -7.30 3891.02 5.54 -5.77 -6.64 3979.41 4.67 -6.21 -5.84 4078.31 3.54 -6.82 -4.80 4170.60 3.96 -6.68 -5.20 4263.29 8.02 -4.79 -8.99 4355,05 16.70 -1.33 -17.19 4449.57 30.79 3.27 -30.69 4541.07 48.88 8.58 -48.12 4632.80 70.64 14.23 -69.22 Closure DLS Srvy displ azim (degl tool (ft) (deg) 100f) type 13.49 355.26 0.13 14.19 349.88 0.14 14.86 344.75 0.11 14.54 338.05 1.55 13.37 328.58 0.09 4723.42 4814.60 4902.86 4990.36 5076.96 5161.04 5244.44 5325.61 5408.07 5491.14 12.60 317.78 0.07 12.27 306.19 0.08 12.48 294.91 0.22 12.63 286.11 0.80 12.56 278.47 0.12 12.37 272.57 0.73 11.69 268.61 0.26 10.94 265.04 0.13 10.34 260.93 0.13 9.88 256.96 0.17 9.49 253.84 0.16 9.23 251.40 0.06 9.14 249.45 0.19 9.16 248.60 0.32 9.45 244.84 0.07 9.68 243.20 0.11 9.80 242.54 0.15 9.84 242.56 0.05 9.72 242.17 0.26 9.36 239.11 0.41 9.03 234.03 0.06 8.80 228.98 0.01 8.53 223.21 0.25 8.34 215.13 0.15 8.46 217.89 2.09 10.19 241.96 3.02 17.24 265.59 3.33 30.86 276,09 3.24 48.88 280.11 2.50 70.66 281.61 2.23 95.19 122.85 152.45 185.33 222.49 19.93 -93.15 26.17 -120.13 31.39 -149.27 35.28 -181.97 38.57 -219,12 95.26 282.08 1.77 122.95 282.29 1.86 152.53 281.88 2.33 185.35 280.97 2.86 222.49 279.98 3.02 262.93 306.79 351.50 396.93 442.43 41.51 -259.67 262.97 279.08 2.38 45.64 -303.47 306.88 278.55 2.40 50.95 -347.93 351.64 278.33 0.33 55.87 -393.21 39%.15=_ 278.09 0.67 59.69 -438.73 44~~'I !'~7~:7'5''~, ?. 0:82 : ~ i~, .t..~ i?. ~ '...: .':': ::~...i Page 2 MWD MWD MWD MWD MWD MWD MWD MWD MWD MWD MWD MWD MWD MWD MWD MWD MWD MWD MWD MWD MWD MWD MWD MWD MWD MWD MWD MWD MWD MWD MWD MWD MWD MWD MWD MWD MWD MWD MWD MWD MWD MWD MWD MWD MWD Arvey Measured Depth (ft) Incl angle (deg) Azimuth angle (deg) Course length (ft) TVD depth (ft) Vertical Displacement section +N/S- +E/W- (ft) (ft) (ft) Closure displ azim (ft) (deg) DLS (deg/ lOO0 Srvy tool type 61 62 63 64 65 66 67 68 69 70 71 72 73 74 75 76 77 78 79 80 81 82 83 84 85 86 87 88 89 90 91 92 93 94 95 96 97 98 99 100 101 102 103 104 105 5673.27 5766.89 5859.87 5956.79 6049.76 6145.47 6240.28 6332.38 6426.29 6521.62 6616.80 6711.27 6805.18 6897.33 6990.74 7083.89 7179.06 7271.91 7365.11 7457.13 7550.53 7645.98 7741.04 7836.78 7927.36 8025.57 8118.15 8212.16 8306.38 8400.75 8494.26 8587.79 8681.58 8773.01 8865.15 8956.20 9019.01 9049.15 9080.36 9109.44 9142.93 9173.26 9204.47 9234.37 9267.74 28.63 29.86 30.10 29.75 30.73 273.60 274.10 274.70 274.90 276.60 94.60 93.60 93.00 96.90 93.00 5574.09 487.64 62.70 -484.11 488.15 277.38 5655.76 533.10 65.78 -529.73 533.80 277.08 5736.32 579.35 69.34 -576.06 580.22 276.86 5820.30 627.49 73.39 -624.23 628.53 276.71 5900.64 674.20 78.09 -670.83 675,36 276.64 30.61 277.10 95.70 5982.96 722.94 83.91 -719.30 724.17 276.65 30.50 276.20 94.80 6064.59 771.05 89.49 -767,16 772.37 276.65 30.39 278.70 92.10 6144.00 817.66 95.54 -813.43 819.02 276.70 30.03 278.40 93.90 6225.14 864.89 102.57 -860.15 866.24 276.80 29.38 277.10 95.30 6307.92 912.08 108.94 -906.94 913.46 276.85 30.86 29.11 29.10 29.57 31.04 30.39 29.73 31.26 30.89 30.11 31.01 31.16 30.46 29.97 29.73 29.93 29.58 29.07 30.67 30.54 29.79 29.52 28.70 29.13 30.47 277.60 276.10 277.10 277.50 278.30 276.80 277.70 279.90 280.80 281.80 279.50 278.00 279.50 277.40 278.80 278.50 277.20 279.00 278.60 277.50 277.20 274.60 275.40 276.00 275.20 275.50 274.70 273.10 272.60 272.50 272.60 273.10 273.80 274.60 274.90 30.57 32.35 35.35 38.57 41.78 95.20 94.50 93.90 92.10 93.40 639O.26 6472.11 6554.16 6634.45 6715.08 959.8O 1006.95 1052.54 1097.62 1144.71 115.05 -954.32 961.23 276.87 120.70 -1001.20 1008.45 276.87 125.95 -1046.57 1054.12 276.86 131.69 -1091.33 1099.24 276.88 138.17 -1138.01 1146.36 276.92 93.20 6795.21 1192.27 144.43 -1185.19 1193.96 276.95 95.20 6877.60 1239.90 150.45 -1232.50 1241.65 276.96 92.80 6957.57 1286.97 157.67 -1279.02 1288.71 277.03 93.20 7037.39 1335.08 166.31 -1326.35 1336.73 277.15 92.00 7116.66 1381.76 175.45 -1372.13 1383.31 277.29 93.40 7197.09 1429.23 184.22 -1418.80 1430.71 277.40 95.50 7278.88 1478.53 191.72 -1467.53 1480.00 277.44 95.00 7360.47 1527.17 199.11 -1515.62 1528.64 277.48 95.80 7443.26 1575.35 206.20 -1563.30 1576.84 277.51 90.60 7521.84 1620.42 212.55 -1607.94 1621.93 277.53 98.20 92.60 94.00 94.20 94.40 45.65 48.84 51.98 54.98 58.15 93.50 93.50 93.80 91.40 92.10 7607.03 7687.42 7769.38 7851.06 7932.31 8013.15 8094.41 8176.36 8256.36 8336.28 8414.76 8468.33 8493.32 8518.33 8540.49 8564.69 8585.33 8605.21 8623.00 8641.35 91.10 62.80 30,10 31,30 29,00 1669.26 1715.18 1761.18 1808.09 1856.12 1903.05 1949.18 1994.64 2038.71 2084.34 2130.46 2163.11 2179.78 2198.45 2216.99 2239.95 2262.09 2285.97 2309.88 2337.55 33.50 30.40 31.20 29.90 33.30 219.90 -1656.23 1670.77 277.56 226.18 -1701.76 1716.72 277.57 232.66 -1747.33 1762.75 277.58 239.83 -1793.69 1809.65 277.62 246.56 -1841.28 1857.71 277.63 252.57 -1887.87 1904.69 277.62 257.33 -1933.88 1950.92 277.58 261.30 -1979.34 1996.51 277.52 265.70 -2023.31 2040.68 277.48 270.16 -2068.86 2086.43 277.44 0.30 1.34 0.41 0.38 1.40 0.29 0.50 1.38 0.42 0.96 1.58 2.01 0.52 0.55 1.63 1.08 0.84 2.04 0.64 1.01 1.58 0.83 1.09 1.22 0.81 0.25 0.79 1.08 1.71 0.61 0.82 1.41 0.97 O.57 1.52 274.47 -2114.92 2132.66 277.39 0.20 277.38 -2147.57 2165.41 277.36 2.91 278.51 -2164.29 2182.14 277.33 10.40 279.44 -2183.09 2200.90 277.29 10.33 280.27 -2201.78 2219,54 277.25 11.07 281.30 -2224.90 2242.61 277.21 11.55 282.41 -2247.19 2264.87 277.16 10.56 283.86 -2271.19 2288.86 277.12 10.21 285.63 -2295.15 2312.85 277.09 10.26 287.93 -2322.84 2340.61 277.07 9.55 MWD MWD MWD MWD MWD MWD MWD MWD MWD MWD MWD MWD MWD MWD MWD MWD MWD MWD MWD MWD MWD MWD MWD MWD MWD MWD MWD MWD MWD MWD MWD MWD MWD MWD MWD MWD MWD MWD MWD MWD MWD MWD MWD MWD MWD Page 3 ,rvey 106 · 107 108 109 110 111 112 113 114 115 116 117 118 119 120 121 122 123 124 125 126 127 128 129 130 131 132 133 134 135 136 137 138 139 140 141 142 143 144 145 146 147 148 149 150 Measured Incl Azimuth Course TVD Vertical Depth angle angle length depth section (ft) (deg) (deg) (ft) (ft) (ft) 9297.34 9329.43 9360.76 9391.87 9423.29 61.13 63.00 63.11 63.19 63.18 9453.59 9485.50 9507.40 9539.56 9571.25 276.10 277.10 276.60 277.60 276.30 9601.88 9634.60 9665.75 9697.79 9729.91 29.60 8656.31 32.10 8671.34 31.40 8685.57 31.10 8699.62 31.40 8713.79 9762.71 9796.83 9826.59 9859.53 9892.43 2363.01 2391.31 2419.26 2446.97 2474.96 9920.60 9953.04 9985.41 1OO17.O4 10048.54 Displacement +N/S- +ENV- (ft) (ft) 10079.30 10110.96 10142.87 10175.19 10206.76 Closure displ azim (ft) (deg) 10238.67 10268.80 10301.22 10333.52 10359.23 290.38 -2348.26 2366,14 277.05 293.64 -2376.43 2394.50 277,04 296.98 -2404.22 2422.49 277.04 300.41 -2431.75 2450.24 277.04 303.80 -2459.57 2478.26 277.04 10390.57 1O422.64 10454.61 10486.12 10518.44 63.09 275.90 30.30 8727.48 2501.92 306,67 -2486.44 2505.29 277.03 63.08 275.80 31.90 8741.92 2530.29 309.57 -2514.74 2533.72 277.02 64.54 276.30 21,90 8751.58 2549.90 311.65 -2534.28 2553.37 277.01 65.36 277.00 32.20 8765.22 2579.02 315.02 -2563.26 2582.54 277.01 68.82 277.80 31.60 8777.52 2608.09 318.77 -2592.12 2611.64 277.01 10550.05 10581.68 10614.02 10645.73 10661.41 2637.03 2668.49 2698.87 2730.59 2762.59 72.41 76.12 79.16 83.55 87.45 30.70 8787.71 32.70 8796.57 31.10 8803.23 32.10 8808.05 32.10 8810.57 278.50 279.20 279.90 280.70 278.90 DLS (deg/ 10o0 10.66 6.44 1.46 2.88 3.70 1.21 0.28 6.97 3,22 11.19 322.88 -2620.78 2640.59 277.02 11.89 327.72 ~2651.87 2672.05 277,05 11.53 332.77 -2681.83 2702.39 277.07 10.02 338.44 -2713.04 2734.07 277.11 13.90 343.88 -2744.57 2766.03 277.14 13.37 87.75 279.70 32.80 8811.94 2795.36 349.15 -2776.91 2798.78 277.17 88.30 280.70 34.10 8813.12 2829.44 355.16 -2810.46 2832.81 277.20 91.35 279.30 29.80 8813.21 2859.23 360.33 -2839.80 2862.57 277.23 93.30 280.70 32.90 8811.87 2892.10 366.04 -2872.17 2895.41 277.26 93.55 281.10 32.90 8809.91 2924.94 372.25 -2904.42 2928.18 277.30 2953.11 2985.49 3017.85 3049.39 3080.82 2.32 3.60 11.26 7.29 1.43 28.20 8808.97 32.40 8809.13 32.40 8809.37 31.60 8809.05 31.50 8808.74 90.25 89.20 89.95 91.20 89.95 281.80 282.50 282.90 284.00 283.60 377.84 -2932.04 2956.29 277.34 11.96 384.66 -2963.72 2988.57 277.40 3.89 391.78 -2995.32 3020.84 277.45 2.62 399.13 -3026.05 3052.26 277.51 5.27 406.65 -3056.64 3083.57 277.58 4.17 86.75 283.60 30.80 8809.62 3111.54 413.89 -3086.56 3114.19 277.64 85.85 282.90 31.70 8811.67 3143.12 421.14 -3117.35 3145.67 277.69 85.95 283.30 31.90 8813.95 3174.90 428.35 -3148.34 3177.35 277.75 87.00 282.90 32.30 8815.94 3207.09 435.65 -3179.74 3209.45 277.80 89.30 284.00 31.60 8816.96 3238.61 443.00 -3210.46 3240.88 277.86 88.60 281.90 31.90 8817.54 3270.46 450.15 -3241.54 3272.65 277.91 87.64 283.40 30.10 8818.53 3300.51 456.74 -3270.89 3302.63 277.95 88.20 281.80 32.40 8819.70 3332.85 463.80 -3302.49 3334.90 277.99 90.80 281.50 32.30 8819.99 3365.14 470.32 -3334.12 3367.13 278.03 92.30 281.10 25.70 8819.29 3390.82 475.35 -3359.31 3392.78 278.05 31.40 8818.02 32.00 8816.98 32.00 8816.23 31.50 8814.51 32.30 8810.31 31.70 8803.82 31,60 8796.99 32.30 8791.45 31.70 8787.08 15.70 8785.16 280.70 283.30 286.10 287.90 289.00 92.35 91.35 91.35 94.90 100.05 10.39 3.59 1.29 3.48 8.07 6.94 5.91 5.23 8.10 6.04 103.60 101.35 98.4O 97.45 96.55 3422.19 3454.15 3486.03 3517.24 3548.91 3579.39 3609.26 3639.97 3670.43 3685.51 292.30 296.60 293.70 294.40 294.80 481.29 -3390.12 3424.11 278.08 1.28 487.94 -3421.40 3456,02 278.12 8.70 496.05 -3452.34 3487.80 278.18 8.75 505.25 -3482.41 3518.87 278.26 12.63 515.38 -3512.78 3550.39 278.35 16.30 526.31 -3541.81 3580.70 278.45 15,14 539.08 -3569.89 3610.36 278.59 15.07 552.60 -3598.69 3640.87 278.73 12.71 565.39 -3627.36 3671.16 278.86 3.71 571.88 -3641.53 3686.16 278.93 6.27 NWl Srvy tool type MWD MWD MWD MWD MWD MWD MWD MWD MWD MWD MWD MWD MWD MWD MWD MWD MWD MWD MWD MWD MWD MWD MWD MWD MWD MWD MWD MWD MWD MWD MWD MWD MWD MWD MWD MWD MWD MWD MWD MWD MWD MWD MWD MWD MWD Page 4 Arvey Measured Incl # Depth angle (ft) (deg) 151 - 10677.67 94.95 296.20 152 10698.96 92.80 295.50 153 10710.51 92.55 295.50 154 10742.44 92.70 295.10 155 10756.42 92.60 294.80 Azimuth Course TVD Ve~ical Displacement Closure angle length depth section +N/S- +E/W- displ azim (deg) (fi) (fi) (fi) (fi) (fi) (fi) (deg) 16.30 8783.53 3701.14 578.86 -3656.16 3701.70 279.00 21.30 8782.09 3721.58 588.13 -3675.29 3722.05 279.09 11.50 8781.55 3732.65 593.07 -3685.65 3733.07 279.14 31.90 8780.09 3763.38 606.69 -3714.47 3763.69 279.28 14.00 8779.44 3776.90 612.59 -3727.15 3777.15 279.33 DLS Srvy (deg/ tool 100f) type 13.01 MWD 10.61 MWD 2.17 MWD 1.34 MWD 2.26 MWD 156 10774.01 157 10806.19 158 10838.30 159 10870.12 160 10901.37 92.65 295.90 92.65 295.90 91.85 295.10 90.90 293.7O 90.75 294.80 17.60 8778.64 3793.85 620.12 -3743.03 3794.05 279.41 32.20 8777.15 3824.79 634.17 -3771.97 3824.91 279.54 32.10 8775.89 3855.69 647.98 -3800.92 3855.76 279.67 31.80 8775.13 3886.48 661.11 -3829.87 3886.51 279.79 31.30 8774.68 3916.82 673.96 -3858.40 3916.82 279.91 6.25 MWD 0.00 MWD 3.52 MWD 5.32 MWD 3.55 MWD 161 10933.10 162 10965.47 163 10997.65 164 11029.84 165 11061.70 89.75 294.40 88.85 292.30 88.95 293.70 88.70 292.30 90.15 291.90 31.70 8774.54 3947.49 687.16 -3887.22 3947.49 280.02 32.40 8774.93 3979.01 700.00 -3916.97 3979.02 280.13 32.10 8775.55 4010.28 712.54 -3946.51 4010.32 280.23 32.20 8776.21 4041.65 725.12 -3976.14 4041.72 280.34 31.90 8776.53 4072.84 737.12 -4005.70 4072.95 280.43 3.40 MWD 7.05 MWD 4.37 MWD 4.42 MWD 4.72 MWD 166 11093.53 167 11125.02 168 11157.11 169 11187.38 170 11220.45 90.45 291.50 90.75 292.60 90.90 292.60 91.25 293.70 91.00 293.30 31.80 8776.36 4103.98 748.88 -4035.24 4104.14 280.51 31.50 8776.03 4134.78 760.70 -4064.44 4135.01 280.60 32.10 8775.57 4166.11 773.03 -4094.07 4166.41 280.69 30.30 8775.00 4195.61 784.94 -4121.92 4196.00 280.78 33.10 8774.35 4227.79 798.14 -4152.27 4228.29 280.88 1.57 MWD 3.62 MWD 0.47 MWD 3.81 MWD 1.42 MWD 171 11252.40 172 11284.70 173 11316.43 174 11348.73 175 11380.42 91.45 291.90 90.90 290.80 90.65 289.70 90.65 291.50 88.40 290.50 31.90 8773.67 4258.91 810.40 -4181.72 4259.52 280.97 32.30 8773.01 4290.57 822.15 -4211.79 4291.29 281.05 31.70 8772.58 4321.76 833.12 -4241.53 4322.58 281.11 32.30 8772.22 4353.51 844.49 -4271.76 4354.43 281.18 31.70 8772.48 4384.63 855.82 -4301.36 4385.67 281.25 4.61 MWD 3.81 MWD 3.56 MWD 5.57 MWD 7.90 MWD 176 11414.60. 177 11444.75 178 11475.26 179 11507.30 180 11537.63 88.10 290.50 87.60 290.80 87.75 291.20 87.90 291.20 90.45 289.70 34.20 8773.52 4418.25 867.74 -4333.40 4419.43 281.32 30.10 8774.65 4447.81 878.32 -4361.56 4449.12 281.39 30.60 8775.89 4477.83 889.28 -4390.10 4479.26 281.45 32.00 8777.11 4509.19 900.84 -4419.91 4510.78 281.52 30.30 8777.54 4538.99 911.42 -4448.30 4540.71 281.58 0.88 MWD 2.13 MWD 1.40 MWD 0.47 MWD 9.76 MWD 181 11569.80 182 11601.01 183 11633.18 184 11664.79 185 11696.65 92.60 290.80 92.25 291.50 92.20 290.80 92.45 290.80 94.95 292.30 32.20 8776.69 4570.66 922.56 -4478.50 4572.53 281.64 31.20 8775.37 4601.24 933.81 -4507.57 4603.28 281.70 32.20 8774.12 4632.81 945.42 -4537.58 4635.02 281.77 31.60 8772.83 4663.82 956.63 -4567.09 4666.21 281.83 31.80 8770.78 4694.91 968.29 -4596.60 4697.48 281.90 7.50 MWD 2.51 MWD 2.18 MWD 0.79 MWD 9.16 MWD 186 11728.59 187 11760.38 188 11790.86 189 11822.93 190 11854.75 94.75 293.00 94.60 292.30 94.77 293.20 94.60 291.90 94.45 292.60 32.00 8768.08 4726.02 980.57 -4626.03 4728.81 281.97 31.80 8765.49 4756.95 992.77 -4655.28 4759.96 282.04 30.50 8763.00 4786.60 1004.53 -4683.31 4789.83 282.11 32.00 8760.38 4817.73 1016.76 -4712.77 4821.20 282.17 31.80 8757.87 4848.71 1028.76 -4742.11 4852.41 282.24 2.27 MWD 2.24 MWD 2.99 MWD 4.08 MWD 2.24 MWD 191 11887.23 192 11918.56 193 11950.62 194 11982.53 195 12014.58 91.50 293.00 90.80 292.30 90.75 292.30 90.70 292.30 90.30 292.30 32.50 8756.19 4880.35 1041.34 -4772.02 4884.32 282.31 9.16 MWD 31,40 8755.56 4910.98 1053.42 -4801.00 4915.21 282.38 3.15 MWD 32.00 8755.12 4942.25 1065.57-4830.60 4946.73 282.44 0.16 MWD 31.90 8754.72 4973.41 1077.67-4860.11 :~¢97;8.,16:"282;50~:'.. 0.16 MWD 32.10 8754.44 5004.77 1089.85 -4889.81 "";~-E)~9.?'.'91~ ;~82':15~i :'.? 1.25MWD Page 5 Arvey Measured Incl # Depth angle (ft) (deg) Azimuth Course angle length (deg) (ft) TVD Vertical Displacement depth section +N/S- +E/W- (ft) (ft) (ft) (ft) Closure displ azim (ft) (deg) DLS (de(j/ lO00 Srvy tool 196 - 12046.24 90.25 293.00 197 12078.24 89.80 292.60 198 12109.84 89.30 293.00 199 12141.50 87.55 291.90 200 12165.79 87.40 291.90 201 12204.05 202 12234.06 2O3 12267.O2 2O4 12299.O7 205 12330.78 206 12362.96 207 12395.78 208 12487.00 87.45 292.60 89.85 291.90 90.85 292.60 91.05 291.90 90.45 291.90 89.00 290.10 89.20 290.50 89.20 290.50 31.60 8754.29 5035.61 1102.02 -4918.97 5040.91 282.63 32.00 8754.27 5066.81 1114.42 -4948.47 5072.41 282.69 31.60 8754.52 5097.62 1126.66 -4977.60 5103.52 282.75 31.70 8755.39 5128.57 1138.77 -5006.89 5134.75 282.81 24.30 8756.46 5152.32 1147.82 -5029.41 5158.73 282.86 38.20 8758.18 5189.61 1162.27 -5064.73 5196.38 282.92 30.10 8758.89 5219.02 1173.66 -5092.58 5226.07 282.98 32.90 8758.69 5251.17 1186.12 -5123.03 5258.55 283.04 32.10 8758.16 5282.53 1198.27 -5152.73 5290.23 283.09 31.70 8757.74 5313.55 1210.10 -5182.15 5321.56 283.14 32.20 8757.89 5345.15 1221.63 -5212.20 5353.45 283.19 32.80 8758.41 5377.43 1232.98 -5242.97 5386,00 283.23 91.20 8759.68 5467.12 1264.77 -5328.44 5476.49 283.35 2.22 MWD 1.88 MWD 2.03 MWD 6.52 MWD 0.62 MWD 1.84 MWD 8.31 MWD 3.71 MWD 2.27 MWD 1.89 MWD 7.18 MWD 1.10 MWD 0.00 EXT Page 6 TONY KNOWLE$, GOVERNOR ALASKA OIL AND GAS CONS E RYATI ON C OMMISSI ON 3001 PORCUPINE DRIVE ANCHORAGE, ALASKA 99501-3192 PHONE: (907) 279-1433 FAX: (907) 276-7542 January 24, 1997 Dan Stolz, Senior Drilling Engineer BP Exploration (Alaska) Inc. P O Box 196612 Anchorage, AK 99519-6612 R.e: Prudhoe Bay Unit S-44L1 BP Exploration (Alaska) Inc. Permit No. 97-07 Surf Loc 4242'NSL, 4502'WEL, Sec 35, T12N, R12E, UM Btmhole Loc 50932qSL, 993'WEL, Sec 33, T12N, R12E, UM Dear Mr Stoltz: Enclosed is the approved application for permit to drill the above referenced well. The permit to drill does not exempt you from obtaining additional permits required by law from other governmental agencies, and does not authorize conducting drilling operations until all other required permitting determinations are made. This permit is for a new segment for existing well S-44, API No. 0292273500, Permit No. 97-06. Production should continue to be reported as a function of the original well identifier. Blowout prevention equipment (BOPE) must be tested in accordance with 20 AAC 25.035. Sufficient notice (approximately 24 hours) of the BOPE test performed before drilling below the surface casing shoe must be given so that a representative of the Commission may witness the test. Notice may be given by contacting the Commission petroleum field inspector on the North Slope pager at 659-3607. C.hairman ~ BY ORDER OF THE COMMISSION dlf/encl c: Dept Of Fish & Game. Habitat Section - w/o encl Dept of Environmental Conservation - w/o encl STATE OF ALASKA ALASKA UIL AND GAS CONSERVATION COMMISSION PERMIT TO DRILL 20 AAC 25.005 [] Drill [] Redrill Ilb. Type of well [] Exploratory [] Stratigraphic Test [] Development Oil" 1. a. Type of work [] Re-Entry [] DeepenI [] Service [] Development Gas [] Single Zone [] Multiple Zone 2. Name of Operator 5. Datum Elevation (DF or KB) 10. Field and Pool BP Exploration (Alaska) Inc. Plan KBE = 66.9' Prudhoe Bay Field / Prudhoe i3. Address 6. Property Designation Bay Pool P.O. Box 196612, Anchorage, Alaska 99519-6612 ADL 028258 4. Location of well at surface 7. Unit or Property Name 11. Type Bond (See 20 AAC 25.025) 4242' NSL, 4502' WEL, SEC. 35, T12N, R12E Prudhoe Bay Unit At top of productive interval 8. Well Number Number 2S100302630-277 4687' NSL, 2666' WEL, SEC. 34, T12N, R12E S-44L1 Attotal depth 9. Approximate spud date Amount $200,000.00 5093' NSL, 993' WEL, SEC. 33, T12N, R12E 01/27/97 12. Distance to nearest property line113. Distance to nearest well i14.Number of acres in propertY/i,,~,. Proposed depth (MD and TVD) ADL 028259, 4287' MDI No Close Approach 2560 /~,/2..~' ~ MD / J~98~ TVD 16. To be completed for deviated wells i17. Anticipated pressure {see 20 AAC 25.035 (e) (2)} Kick Off Depth 600' Maximum Hole Angle 93.8° Maximum surface 3300 psig, At total depth (TVD) 8800' / 4390 psig 18. Casing Program Specifications Setting Depth Size Top Bottom Quantity of Cement Hole Casing Weight Grade Coupling Length MD TVD MD TVD (include stage data) 30" 20" 91.5# H-40 Weld 80' Surface Surface 110; 110' 260 sx Arctic Set (Approx.) 12-1/4" 9-5/8" 40# L-80 BTC-Mod 3205' Surface Surface 3205' 3129' 193OsxCS 111, 465 sx'G', 250 CS II 8-1/2" 7" 26# L-80 BTC-Mod 9995' Surface Surface 9995' 8952' 595 sx Class 'G' 6" 4-1/2" 12.6# L-80 BTC-Mod 4826' 9300' 8781' 14126' 8942' Uncemented Slotted Liner 19. To be completed for Redrill, Re-entry, and Deepen Operations. Present well condition summary Total depth: measured feet Plugs (measured) true vertical feet Effective depth: measured feet Junk (measured) true vertical feet Casing Length Size Cemented MD TVD Structural Conductor Surface Intermediate Production JAN 09 1997 Liner AJaska 0il & Gas Cons. Commission Anchorage Perforation depth: measured true vertical 20. Attachments [] Filing Fee [] Property Plat [] BOP Sketch [] Diverter Sketch [] Drilling Program [] Drilling Fluid Program [] Time vs Depth Pict [] Refraction Analysis [] Seabed Report [] 20 AAC 25.050 Requirements Contact Engineer Name/Number: David Nakamura, 564-5606 Prepared By Name/Number: Terrie Hubble, 564-4628 21. I hereby certify that t~ f~rego)~g i,s trj~ and correct to the best of my knowledge ~ I/~' Signed /~ /-" ?"" ~'"~ Paul Pdnce ,~¢,¢_/_~¢'~-f¢'¢_~-~¢".~... Title Senior Drilling Engineer Date ...... <~ Commission Use Only Permit Number APl Number Approval~Date,~ I See cover letter ?.~- 4;~ 7 50-0 2_..'~ -- 2_ ~ 7 ,.~ .~'"' ~--/~ / '"~?') ¢'"' *~~. I for other requirements Conditions of Approval: Samples Required [] Yes ~ No Mud Log Required [] Yes ~ No Hydrogen Sulfide Measures .,~es [] No Directional Survey Required ~ Yes [] No Required Working Pressure for BOPE [] 2M; []3M; ~SM; [] 1OM; [] 15M / Other: 01-igiRe, Signed 8~' by order of Approved By ...... ...: :~: _!nhnst0.r, Commissioner the commission Date· '"). Form 10-401 Rev. 12-01-85 David Sub~ I Well Name: IS-44 / S-44L1 Well Plan Summary Type of Well (producer or injector): I Oil Producer Surface Location: 4242' FSL 4502' FEL Sec 35 T12N R12E Start of Horizontal Location: End of Horizontal Location: 747' FSL 4811' FEL Sec 27 T12N R12E Sadlerochit Zone 4 (lower) Lateral 4588' FSL 2424' FEL Sec 34 T12N R12E Start of Horizontal Location: End of Horizontal Location' 5093' FSL 993' FEL Sec 33 T12N R12E Sag River (upper) Lateral 4687' FSL 2666' FEL Sec 34 T12N R12E I AFE Number: I 4P0855 I Estimated Start Date: IJan. 27,1997 I IMD: 1~2845' I ITvD: I Ri~l: I Nabors 18E I Operatin9 days to complete: I 45 18aao' I IRT-GL 129'7' [ KBE:[ 66.9' IWell Design (conventional, slimhole, etc.) I Ultra Slimhole High Angle Multi-Lateral I (targeting Sadlerochit Zone 4 and Sag RiVer) Formation Markers: Formation Tops MD TVD (RKB) SV3 2484' 2787' K-15 3672' 3580' Ugnu 3724' 3627' West Sak 5007' 4857' Seabee 5434' 5267' CMl 6529' 6317' Kuparuk 6842' 6617' LCU 6920' 6692' Kingak 7863' 7597' J-D 8460' 8169' J-B 8969' 8619' Sag River 9266' 8767' Shublik 9361' 8807' Sadlerochit 9629' 8897' TD of Sadlerochit Lateral 12845' 8980' TD of Sag River Lateral 14126' 8942' I I S-44 / S-44L1 Permit Info Page I Casin ]/Tubinqram: Hole Size Csg/ Wt/Ft Grade Conn. Length Top Btm Tb~l O.D. MD/TVD MD/TVD 30" 20" 91.5# H-40 Weld 80' Surface 110'/110' 12-1/4" 9-5/8" 40# L-80 BTC- 3205' Surface 3205'/3129' MOD 8-1/2" 7" 26# L-80 BTC- 9995' Surface 9995'/8952' MOD Lower Lateral 6" I 4-1/2" 12.6#I L-8O IBTC-MOD ,I 3000' I 9845'/8870' I 12845'/8980' Upper Lateral Tubin[I Mud Program' · · ~;urface Mud Pr(~perties: I Surface hole section: SPUD Density Marsh - Yield 10 sec 10 min pH Fluid (PPG) Viscosity Point ~lel ~lel Loss Initial 8.5 _ 300 40-60 30-60 50-80 .9-10 15-25 Final 9.5 200-300 25-50 15-25 25-40 - ~9-10 15-25 Hazards/Concerns Due to light gravel expectations, no real concerns in surface hole. "Intermediate Mud Properties: I Intermediate hole section: LSND Density Marsh Yield 10 sec 10 min pH Fluid (PPG) Viscosity Point gel gel Loss Initial 8.8-9.0 35-40 8-12 3-6 8-10 9.0-9.5 8-12 Cretaceous 9.8 40-45 10-12 4-8 8-12 9.0-9.5 6-8 Final 10.0 45-50 12-15 4-8 8-12 9-10 <6 HTHP-13.0 Hazards/Concerns Cretaceous overpressure expected, MW to be at least 9.8 ppg. Utilize hi vis sweeps to assist hole cleaning Monitor LSYP and increase if problems occur trying to clean the hole. Potential high torque could need lubricants (EP MudLube/BDF 124) Reduce APl fluid loss to <6 cc before drilling Kingak Section. If high torque is encountered, respond with lubricants. Note: The Jurassic shales may be troublesome, so treat with Baratrol, Baranex, and Boreplate at 2.0 ppb each. Production Mud Properties: I Production hole section: Sheardril-n for Sadlerochit and Sag I.I River laterals Depth Density Marsh Yield 10 sec 10 min pH Fluid (PPG) Viscosity Point gel gel Loss Initial 8.8-9.0 50-60 30-40 15-20 18-24 8.5-9.0 <6 Final 8.8-9.0 50-60 30-40 15-20 18-24 8.5-9.0 <6 Hazards/Conce.rns Lost Circulation a possibility due to overbalance in Sadlerochit. Differential sticking possible with overbalance situation. Perform/report daily checks on KCI concentrations in Xanvis KCI system. High torque may be experienced and should be countered with lubricants (LubeTex) S-44 / S-44L1 Permit Info Page 2 Logging Program: I Logs: I 12-1/4" Hole MWD Directional 8-1/2" Hole I MWD Directional 6" Hole I MWD GR/Directional/Resistivity Cased Hole: J CNL/CBT (optional) Directional: I KOP: 1600' IMaximum Hole Angle: Tangent Angle I Close Approach Well: I 93.8° 16.4° None Well Control: Well control equipment consisting of 5,000 psi W.P. pipe rams, blind rams, and annular preventer will be installed and is capable of handling maximum potential surface pressures. Diverter, BOPE and drilling fluid system schematics on file with AOGCC. S-44 / S-44L1 Permit Info Page 3 . . . . . . . . . 10. 11. 12. 13. 14. 15. 16. PROPOSED DRILLING AND COMPLETION PROGRAM WELL: S-44 / S-44L1 MIRU. NU diverter and function test same. Drill 12-1/4" hole to _+ 3205' MD/3129' TVD. Run and cement 9-5/8" 40# L-80 BTC-MOD casing to surface using Davis-Lynch Type 700 S-PVTS Screw-In Assembly. Install blowout prevention equipment consisting of 5000 psi W.P. pipe rams, blind rams, and annular preventer. Maximum possible bottomhole pressure is 4390 psi at 8800' TVDss based on original reservoir pressure. Maximum possible surface pressure is 3330 psi based on a gas column to surface from 8600' TVDss and an oil column to 8800' TVDss. Function test BOPE to 5000/250 psi. Test 9-5/8" casing to 3000 psi for 30 minutes (Record and graph the pressure vs amount pumped on casing test and use as a baseline for the leak-off test). A formation leak-off test will be performed when 20' of new hole has been drilled below the 9-5/8" shoe. Also, perform a well kill drill at this time. Directionally drill 8-1/2" hole to 7" casing point at 9995' MD/8982' TVD. Run 7" 26# L-80 BTC-MOD casing string and cement with Class G cement to 1,000' MD above the Top Sag River. Test casing to 3,500 psi. The annulus will be freeze protected with dead crude oil. Drill 20' of new 6" hole and test the formation to a minimum of 0.5 ppg over the mud weight t_9o b_b_e used to drill the previous hole section. Displace mud system to Sheardril-n mud system. Directionally drill high angle section with MWD/GR/Resistivity to TD at +_ 12845' MD/8980' TVD. RIH with 4-1/2", 12.6#, L-80 solid liner, 7" x 4-1/2" packer/hanger spaced out for a 150' lap and a 2-3/8" inner wash string. Cement liner in place through the inner wash string with the total cement volume based on 40% excess in open hole, 150' lap and 80' shoe volume. Displace the cement with seawater. Bump plug. Set and test liner hanger/packer with 3500 psi. RIH with 2-3/4" drillpipe conveyed perf guns and perforate 4-1/2" liner. POOH and lay down guns. Set 7" x 4-1/2" permanent production packer (with 4-1/2" tubing tail) at 9295' MD (17' MD below the planned top of whipstock). Set oriented, retrievable whipstock above permanent packer so the top of the whipstock window will be at 9278' MD. Displace well to Sheardril-n mud system used to drill lower lateral. Mill window off whipstock at 9278' MD and drill 29' window/new hole. POOH. RIH with 6" steerable assembly (MWD/GPJResistivity). Finish kickoff and directionally drill in Sag River, drilling 6" horizontal hole to TD at 14126' MD/8942' TVD. Run and set a 4-1/2", L-80 slotted liner. Top of liner will be at 9300' MD (10' below casing exit/base of whipstock). RIH and pull retrievable whipstock. Run 4-1/2", 12.6 # L-80 IBT-MOD tubing with SSSV, GLMs, and 7" packer assembly. Space out tubing packer so t~il pipe is inside of liner hanger tieback. Circulate around freeze protection fluid and corrosion inhibitor. Set packer and test tubing to 4,000 psi. Set TWC and test to 1000 psi. ND BOPE. NU tree and test to 5000 psi. Pull TWC. Test tubing x casing annulus to 3500 psi for 30 minutes. Secure well. Release rig. - S-44 ! S-44L1 Permit Info Page 4 Drilling Hazards Hydrocarbon-bearing zone in the Ugnu formation. Losses have been encountered drilling the Kingak, Sag River/Shublik and Sadlerochit formations on S Pad. Be prepared for losses near any faults and formation interfaces between the Kingak, Sag River/Shublik and Sadlerochit. A minimum of 9.8 ppg mud weight will be used to drill the Cretaceous injection interval. This will allow a 100 psi trip margin over the expected 9.4 ppg EMW @ 5000' TVDss. Disposal Cuttings Handling' Cuttings should be hauled to the ball mill at CC-2A. Fluid Handling' Haul all drilling and completion fluids and other Class I! wastes to CC-2A for injection. Haul all Class I wastes to Pad 3 for disposal. In addition, haul all cutting from drilling operations to CC- 2A for disposal, except the metal cuttings which will be sent to the North Slope Borough. S-44 / S-44L1 Permit Info Page 5 9-5/8" SURFACE CASING CEMENT PROGRAM - BJ SERVICES CASING SIZE: 9-5/8" CIRC. TEMP: 38°F PREFLUSH: 75 bbls fresh water ahead of lead slurry. LEAD CEMENT TYPE: COLD SET III ADDITIVES: retarder WEIGHT: 12.2 ppg APPROX. # SACKS: --+1930 YIELD: 1.92 ft3/sx TAIL CEMENT TYPE: CLASS G ADDITIVES: 2% A-7 +1 ghs FP-6L WEIGHT: 15.8 ppg YIELD: 1.15 ft3/sx APPROX. # SACKS: 465 MIX WATER: 10.53 g~_.~~__~ V THICKENING TIME: Greater than 4 hr. @ 50°F JAN 0 9 1997 A~aska 0il & Gas Cons. C~mmi~i0n MIX WATER: 4.95 gps THICKENING TIME: Greater than 3-1/2 hr. @ 50°F TOP JOB CEMENT TYPE: COLD SET II (if necessary) ADDITIVES: WEIGHT: 14.5 ppg YIELD: 0.96 ft3/sx MIX WATER: 3.89 gps APPROX. # SACKS: 250 THICKENING TIME: Greater than 2 hr. @ 50°F CENTRALIZER PLACEMENT: 1. Run I turbolator (9-5/8" x 12") per joint for the first 15 joints. 2. Run two turbolators (9-5/8 x 12") per joint for the next 19 joints (to the Base of the Permafrost) CEMENT VOLUME: 1. Lead slurry volume estimated: a. Surface casing shoe to Base Permafrost with 30% excess b. Base of Permafrost to Conductor shoe with 500% excess c. Conductor x Surface Casing annulus (80' MD) NOTE: With the stab-in job, the actual lead cement volumes will be determined by the amount of cement necessary to get lead cement to surface. 2. Tail slurry volume from surface casing shoe to Base Permafrost with 30% excess plus the 80' shoe volume 3. Top job volume 250 sx (if necessary). The increase in excess volume to cover the Permafrost to 500% excess is based primarily upon not bringing cement to surface with 100% excess on the two most recent N Pad wells. The history of N Pad surface casing cement jobs indicated that with 100% excess, cement has been brought up to surface. S-44 / S-44L1 Permit Info Page 6 7" PROTECTION CASING CEMENT PROGRAM - BJ SERVICES CASING SIZE: 7" CIRC. TEMP: 140°F PREFLUSH: 20 bbls fresh water SPACER: 50 bbls BJ MCS-4 Spacer weighted 1.0 ppg above mud weight. LEAD CEMENT TYPE: CLASS G ADDITIVES: 3% A-2 + 0.4% FL-52 + 0.5% CD-32 + I ghs FP-6L WEIGHT: 11.0 ppg YIELD: 3.31 ft3/s× MIX WATER: 20.92 gps APPROX. # SACKS: 290 THICKENING TIME: 5 hrs FLUID LOSS: 150-250 cc/30 minutes FREE WATER: 0 cc TAIL CEMENT TYPE: CLASS G ADDITIVES: 0.3% FL-52 + 0.5% CD-32 + 0.1% A-2 + 1.0 ghs FP-6L WEIGHT: 15.8 ppg YIELD: 1.14 ft3/sx MIX WATER: 4.85 gps APPROX. # SACKS: 305 THICKENING TIME: 3-1/2 to 4-1/2 hrs FLUID LOSS: 100-150 cc/30 minutes FREE WATER: 0 cc CENTRALIZER PLACEMENT: 1. Run 1 Turbulators per joint from TD to 500' MD above shoe. 2. Run 1 straight blade rigid centralizer every joint 300' above and below the Ugnu. OTHER CONSIDERATIONS: Perform lab tests on mixed cement/spacer/mud program and ensure compatibility prior to pumping job. Ensure thickening times are adequate relative to pumping job requirement. Displace at 12 bpm. Mix the lead and tail slurries on the fly. CEMENT VOLUME: 1. Lead slurry to 3224' MD (500' above Ugnu) with 50% excess 2. Tail slurry to 8266' MD (1000' above Sag River) with 50% excess 3. 80' MD 7" 26# capacity for float joints. Note: Hydrocarbon bearing zones are identified in the Ugnu and Sag River intervals. s-44 / S-44L1 Permit Info Page 7 4-1/2" PRODUCTION LINER (UPPER LATERAL) CEMENT PROGRAM- aJ SERVICES CIRC. TEMP: 140° F BHST: 220° F at 8800' TVDss PREFLUSH: 20 bbls 2% KCI water SPACER: 50 bbls BJ MCS-4 Spacer weighted 1.0 ppg above mud weight with 2% KCI CEMENT TYPE: CLASS G with 2% KCI ADDITIVES: 175 ghs BA-86L + 2% A-9 + 0.6% CD-32 + 0.3% FL-33 + 0.2% A-2 + 0.5% gel + 1 ghs FP-6L WEIGHT: 15.7ppg YIELD: 1.19ft3/sx MIXWATER: 3.43gps APPROX. # SACKS: 310 THICKENING TIME: 45 min. @ Surface + 3-4 hr. @ 140°F FLUID LOSS: less than 50 cc/30 minutes @ 140°F FREE WATER: 0 cc at 45° angle. CENTRALIZER PLACEMENT: 1. Run 2 right hand turbolators per joint in open hole, 2. Run 1 right hand turbulator per joint in lap, and none opposite intermediate casing shoe.. OTHER CONSIDERATIONS: Batch mix the cement slurry. Perform fluid loss test on the batch mixed slurry. Fluid loss should be 50 cc/30 min. or less. Report actual fluid loss on morning report. Displace @ 6-8 bpm. LINER CEMENT VOLUME: 1. Open hole (6" X 4-1/2") + 40% excess (adjust if a caliper log is run and it indicates severe washouts). 2. 4-1/2", 12.6# casing capacity below landing collar (80'). 3. 150' liner lap 4-1/2" PRODUCTION LINER (LOWER LATERAL) No cement necessary - slotted liner. S-44 / S-44L1 Permit Info Page 8 I S,,tq'ARE'D 'SERV ICES DRILLING 4nadrJ ]] $£h]umberger i S-44L 1 (P VERTICAL SECTION VIEW Section at' 280 O0 ~-- ITVD Scale.' 1 inch: 600 feet Dep Scale · 1 inch : 600 feet ) ........ :- -._ ..... Drawn. · 17 Dec 1996 ! ' " .... A~A-DPC ' ANADRi LL ~ J " ) " ~ ~ra ~,~lr~,~D : .' Harker Identification ~D BKB SECTN INCLN . FC RPERMIrTING ' , A] 1~ OF ,HJPSTOCK 927B 8772 2540 65.( : B) BA~ OF WHIPSTOCK 9290 8777 2550 67.00 0~~ : CJ K~/BUILD 25/~00 9307 8783 2566 67.00 ' I D) CffiVE 25/100 9337 8793 2594 74.~ ' " _.~.~ ' F} ~VE 12/100 10092 8643 3346 ) '; ................... ~ Gl. END. CURVE 12/100 10216 8847 3469 89.~ . · i H) TA~ET START 10216 8B47 3469 89.~ ' : II. CURVE. 18/~00 ~69 8860 '5382 . , ' : ' J) E~ 18/100 CURVE ~2196 886] 5408 85.:t )--~: .... ' I " I ......... K] C~.18/100 12655. 8699 5852 85.~ ' i . i L] E~ CURVE lB/lO0 ]2926 8914 61t0 88.~ ' MI ID IAgGEI END ~t26 8942 70B3 . ~-~. : ......................... .,, ....... . ~~.~.- ....................................... , .......... . .................................... . ; . . . t . . .................................. 2400 2700 3000 3300 3600 3900 4200 4500 4BO0 5t00 5400 5700 6000 6~0 6600 6900 72(30 7500 7800 Section Departure {lna~ll {c)~ S44L. lP~5 3.~.10 3:06~ P} , . ~). I I 0 0 0 J, j, , S ARED S'ERVT.CES B'R' 'LLIN6 Anadr j ] ] $£h]umberger S-44L1 (P15) PLAN VIEW )- ^*,^~r~,,, ~ CLOSURE ..... : 7~03 feet at Azimuth 276 ..... ~'*'~ AKA-D'PC DECLINATION.' +28.396 (E) a, PPROVE,9 SCALE ' 1 inch =600 feet -- Marker ldenti'f ication MD N/S E/W · --r, ~ ~ ~L~ A) TOP OF ~HIPSTOCK 9278 316 N 2523 ~ -' -- : j B) BASE OF ~IPSTOCK 9290 318 N 2534 ~ : ' ' ' C) KOP/BUILD 25/100 9307 320 N .2549 )- -' . ............. DJ CURVE 25/~00 9337 · 323 N 2577 ' 'E) END 25/~00 BUILD 93B6 ~9 'N 2625 .G) END CURVE J2/~O0 ~02t6 447 N 3444 )- : . ; ...... H) TARGET 'START ~0216 447 N 3444 i . I) CURVE lB/lO0 12~69 ii70 N 5259 ~ ~ ' 'J) END ~8/~00 cuRvE ~2t96 tlSO'N 5283 ' m' K) 'CURVE 18/100 ' i2655 i~5 N 5702 ~ ..... ~ : '. ......... ~.. .. ~. ~' L) END CURVE ~B/~O0 ' 12926 1362 N 5965 . . '/~i' ' '" ~ ~. M} TD-'TARGETEND '4126 ~5 N 7052" '~ " . 7000 6700 6400 6100 5800 5500 .5200 4900 4600 4300 .4000 ,3700 3400 3i00 2800 2500 2200 <- WEST . >aOr~iJ (c}96 S44L1P~5 3.Ob.lO 3:20 PM PI 0 O' '1 I 0 :> 1 (.~n aclr ~ 11 SHARED SERVICES i ! MankeP Identification MD N/S E/W A) TOP OF HHIPSTOCK 9278 3~6 N 2523 8) BASE OF ~IPSTOCK 9290 3~8 N 2534 C) KOP/BUILD 25/100 9307 320 N 2549 D) CURVE 25/100 9337 323 N 2577 E) END 25/100 BUILD 9386 329 N 2625 F) CURVE 12/100 10092 417 N 3324 G) END CURVE 12/100 10216 447 N 3444 H) TARGET STAFll 10216 447 N 3444 I) CURVE IB/100 12~69 1170 N 5259 J) END IB/~O0 CURVE 12~96 1lBO N 5283 K} CURVE 1B/tO0 ~2655 ~365 N 5702 L) END CURVE J8/lO0 12926 ~362 N 5965 M) TD - TARGEI END ~4126 855 N 7052 DRILLING ANADRILL AKA-DPC APPROVED FOP, PERMITTING ONLY Anadri ]] S£h]umberger S-44L1 PLAN VIE~ CLOSURE ..... : 7~03 feet at Azimuth 276.9~ DECLINATION.: +28.396 (E) SCALE ....... : ~ inch = ~000 feet DRAWN ....... : 17 Dec 1996 . . t I t ' :' ' '' t. " ' I ' ., i . · , · · '' I i I .... . [ ~' . ~ . . ; ~ "~ ~~rt (Point) ' ............... -- , . -- .., ~ , , . . i · ' , ! i 8500 8000 7500 7000 §500 15000 5riO0 ~000 4500 ~000 ~00 ~000 8500 ~000 ~500 ~000 500 0 <- ~EST · EAST -> · 'J ',4 I AnaJrill Sch!umber~er Alaska District 1]11 East 80th Avenue Anchorage, AK 99518 (907) 349-4511 Fax 344-2160 DIRECTIONAL WELL PLAN for SHARED SERVICES DRILLING Well ......... : S-44L1 {P15) Field ........ : Prudh0e Bay, S-Pad Computation..: Minimum Curvature Units ........ : FEET. Surface Lat..: 70.35522718 N Surface Long.: 149,03416937 W Legal Description Surface ...... : 4241 FSL 4502 FEL S35 T12N R12E UM Top Whipstock: 4557 FSL 1745 FEL S34 T12N R12E DM Target Start.: 4687 FSL 2666 FEL S34 T12N R12E UM BHL -Tgt End: 5093 FSL 993 FEL S33 T12N ~12E UM LOCATIONS - ALASKA Zone: 4 X-Coord Y-Coord 618929.90 5980445.00[~ 616402.4% 5980721.11 615479.42 5980837.66t~ 611866.00 5981188.00 PROPOSED WELL PROFILE STATION MEASURED INCLN DIRECTION VERTICAL-DEPTHS SECTION IDENTIFICATION DEPTH ANGLE AZIMUTH TVD SUB-SEA DEPART TOP OF WHIPSTOCK 9278.05 65.00 277.52 8771.90' 8705.00 2539.52 BASE OF WHIPSTOCK 9290.05 67.00 277.52 8776.78 8709.88 2550.48 KOP/BUILD 25/100 9307.05 67.00 277.52 8783.42 8716.52 2566.11 CURVE 25/100 9337.05 74.50 277,52 8793.31 8726.41 2594.39 9350.00 77.73 277,40 8796.41 8729.51 2606.94 END 25/100 BUILD SHUBLIK CURVE 12/100 9385.58 86.63 277.10 9481.59 86.63 277.10 10091.65 86.63 277.10 10100.00 86.82 278.09 10150.00 88.02 283.97 10200 00 89.23 289.85 8801.25 8734.35 2642.12 8806.90 8740.00 2737.84 8842.81 8775.91 3346.06 8843.29 8776.39 3354.39 8845.54 8778.64 3404.31 8846.74 8779.84 Prepared ..... : 17 Dec 1996 Vert sect az.: 280.00 KB elevation.: 66.90 ft Magnetic Dcln: +28.396 (E) Scale Factor.: 0.99991607 Convergence..: +0.90962425 ANADRILL AKA-DPC APPROVED FOR PERMITTING ONLY PLAN COORDINATES-FROM ALASKA Zone 4 TOOL DL/ WELLHEAD X Y FACE 100 316.23 N 2522.94 W 616402.47 5980721.11 HS 317.66 N 2533.81 W 616391.58 5980722.37 HS 16.66 319.71 N 2549.33 W 616376.03 5980724.17 HS 0.00 323.41 N 2577.39 W 616347.92 5980727.43 2L 25.00 325.05 N 2589.84 W 616335.44 5980728.87 2L 25.00 32~.49 N 2624.78 W 616300.44 5980732.76 HS 25.00 341.34 N 2719.88 W 616205.17 5980743.09 ~S 0.00 416.62 N 3324.22 W 615599.77 5980808.76 79R 0.00 417.72 N 3332.~8 W 615591.49 5980809.73 79R 12.00 427.27 N 3381.48 W ~15542.34 5980818.51 78R 12.00 3453.91 441.81 N 3429.29 W 615494.32 5980832.28 78R 12.00 (Anadrill (c)96 S44L1P15 3,0b.10 2:59 PM P) O O PROPOSED WELL ?RCFZLE STATION MEASURED INCLN DIRECTION IDENTIFICATION DEPTI4 ANGLE AZIMUTH END CURVE 12/100' 10215.85 89.62 291.71 TARGET START 10215.85 89.62 291.71 CURVE 18/100 12169.06 89.62 291.71 END 18/100 CURIE 12195.73 85.31 293.82 TS)kD 12633.50 85.31 293.82 VERTICAL-DEPTHS TVD SUB-SEA 8846.90 8780.00 8846.90 8780.00 8859.90 8793.00 8861.08 8794.18 8896.90 8830.00 CURVE 18/100 12654.67 85.31 293.82 12700.00 85,68 285.65 12750.00 86.20 276.64 12800.00 86.81 267L64 12858.00 87.50 258.66 SECTION DEPART END CURVE 18/100 TD - TARGET END CURRENT OWC TOP HO/T 12900.00 88.25 249.68 12926.11 88.66 245.00 14126.11 88.66 245.00 3469.48 3469.48 5381.98 5407.96 5831.63 ~age 2 COORDINATES-FROM ALASKA Zone 4 WELI/~EAD X Y .~m==== ==~ 447.43 N 3444.10 W 615479.42 5980837.66 447.43 N 3444.10 W 615479.42 5980837.6~ 1169.95 N 5258.72 W 613653.72 5981531.23 1180.26 N 5283.28 W 613629.00 5981541.14 1356.49 N 5682.41 W 613227.16 5981711.00 8898.63 8831.73 5852.12 1365.01 N 8902.20 8835.30 5896.62 1380.25 N 8905.74 8838.84 5946.43 1389.88 N 8908.'80 8841.90 5995.82 1391~74 N 8911.28 8844.38 6043.56 1385.79 N 6088.49 1372.18 N 6110.46 1362.12 N 7093.17 855.12 N 8913.14 8846.24 8913.84 8846.94 8941.90 8875.00 9056.90 8990.00 9066.90 9000.00 __ TOOL DL/ FACE 100 --- HS 12.00 HS 12.00 154R 0.00 HS 18.00 HS 0.00 5701.71 W 613207,73 5981719.21 5744.21 W 613164.99 5981733.78 5793.09 W 6.13115.97 5981742.63 5842.91 W 613066.13 5981743.70 5892.44 W 613016.70 5981736.96 88L 0.00 87L 18.00 86L 18.00 86L 18.°o 85L 18.00 5940.46 W 612968.91 5981722.59 5964.54 W 612944.99 5981712.16 7051.81 W 611866.00 5981188.00 85L 18.00 HS 18.00 0.00 ANADRILL AKA-DPC AI PROVED FOP, p£RIVIITTING ONLY PLAN '_ ~0 0 (Anadril3 (c)96 S44L1P15 3.0b.10 2:59 PM P) .~_~/ / 12/16/981 VENDOR .............. -.:-::'::¥:: :::.: :::::::::. ::::::::::::::::::::::::::: . =============================================== I 121295 CK121296c ,~Ic~ I I I ~ m 5/H T'E~2~I~E HU~3~L :' X ~62,~ ~ I I I I I I I I I I I I I I I I I I I I I I I I I I I I ~ ~ I I I ~ I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I i THE ATTACHED CHECK IS IN PAYMENT FOR ITEMS DESCRIBED ARC~V~= WELL PERMIT CHECKLISToo oo,, INIT CLASS .~1 ./ GEOL O ON/OF ADMINISTRATION ~APPR ~ATEw 1. 2. 3. 4. 5. 6. 7. 8. 9. 10. 11. 12. 13. Permit fee attached ................... Ix~ Lease number appropriate ............... Unique well name and number .............. Y Well located in a defined pool ............. Well located proper distance from drlg unit boundary.. Well located proper distance from other wells ..... IYI Sufficient acreage available in drilling unit ..... If deviated, is wellbore plat included ......... YIYI Operator only affected party ..............i~Y Operator has appropriate bond in force .......... Y Permit can be issued without conservation order .... Permit can be issued without administrative approval. . Can permit be approved before 15-day wait ....... ENGINEERING REMARKS APPR D~TE£ 14. Conductor string provided ................ Y N 7 , ~ 15. Surface casing protects all known USDWs ......... Y N~ ~_ 16. CMT vol adequate to circulate on conductor & surf csg. . Y N ~ 17. CMT vol adequate to tie-in long string to surf sag . . . Y N _ ~ /7 ~ ~. ~ -- ~ ~_ /~ ~ /_ 18. CMT will cover all known productive horizons ....... ~Y ~ ~~/ /~'~'~----~ ~ "~~ ~'L/-~f~JW- 19. Casing designs adequate for C, T, B & permafrost .... .~N 20. Adequate tankage or reserve pit ............. ~ N 21. If a re-drill, has a 10-403 for abndnmnt been approved..-~f----N--~ 22. Adequate wellbore separation proposed....................~N~ 23. If diverter required, is it adequate. N ~ &'/ 24. Drilling fluid program schematic & equip list adequate ~ N 25. BOPEs adequate .................... ~ N 26. BOPE press rating adequate; test to ~ psig.~ N 27. Choke manifold complies w/API RP-53 (May 84)...~- . .~ N ~ / 28. Work will occur without operation shutdown ....... ~ N 29. Is presence of H2S gas probable ............ ~ N GEOLOGY / 30. Permit can be issued w/o hydrogen sulfide measures .... Y Data presented on potential overpressure zones ..... Y 32.31. Seismic analysis of shallow gas zones .......... Y// N /L/'/ d - 33. Seabed condition survey (if off-shore) ........ 34. Contact name/phone for weekly progress reports . . . .//. Y N [exploratory only] GEOLOGY: ENGINEERING: COMMISSION: Comments/Instructions: HOW/rill- A:\FORMS\cheklist rev 01/97 Well HistorY File APPENDIX Information of detailed nature that is not particularly germane to the Well Permitting Process but is part of the history.file. To improve the readability of the Well History file and to simplify finding information, information of this nature is accumulated at the end of the file under APPENDIX. No special effort has been made to chronologically organize this category of information. * ALASKA COMPUTING CENTER * * . ....... SCHL[AVi~ERGER * ............................ . COMPANY NARiE : BP EXPLORATION WELL NAME : S- 44 L1 PB1 FIELD NAME : PRUDHOE BAY BOROUGH : NORTH SLOPE STATE : ALASKA API NUMBER : 50-029-22735-70 REFERENCE NO : 98057 Date ~ l- 0 ,~ "' 6) I LIS Tape Verification Listing Schlumberger Alaska Computing Center 12-FEB-1998 08:45 .~GE: **** REEL HEADER **** SERVICE NAME : EDIT DATE : 98/02/11 ORIGIN : FLIC REEL NA~E : 98057 CONTINUATION # : PREVIOUS REEL : CO~4ENT · B.P. EXPLORATION, PRUDHOE BAY S-44 L1 PB1, API #50-029-22735-70 **** TAPE HEADER **** SERVICE NAME : EDIT DATE : 98/02/11 ORIGIN : FLIC TAPE NAME : 98057 CONTINUATION # : 1 PREVIOUS TAPE : COI4~ENT : B.P. EXPLORATION, PRUDHOE BAY S-44 L1 PB1, API #50-029-22735-70 TAPE HEADER Prudhoe Bay MWD LOGS WELL NAME: API NUMBER: OPERATOR: LOGGING COMPANY: TAPE CREATION DATE: JOB DATA JOB NUMBER: LOGGING ENGINEER: OPERATOR WITNESS: SURFACE LOCATION SECTION: TOWNSHIP: RANGE: FNL : FSL: FEL: FWL: ELEVATION (FT FROM MSL O) KELLY BUSHING: DERRICK FLOOR: GROUND LEVEL: WELL CASING RECORD 1ST STRING 2ND STRING S-44 L1PB1 500292273570 BP Exploration SCHLUMBERGER WELL SERVICES il-FEB-98 BIT RUN 1 ......... 98057 BROWN WHITLEY BIT RUN 2 BIT RUN 3 35 12 12 66.20 66.20 36.50 OPEN HOLE CASING DRILLERS BIT SIZE (IN) SIZE (IN) DEPTH (FT) 8.500 9.625 3066.0 6.000 7.000 9535.0 LIS Tape Verification Listing Schlumberger Alaska Computing Center 12-FEB-1998 08:45 3RD STRING PRODUCTION STRING REMARKS: Well drilled 10-MAR through 29-MAR-97 with MWD GR and ARC5. Ail data was collected in three bit runs. No depth shifts were made to this data as per Troy Weiss via D. Douglas. $ $ _AGE: **** FILE HEADER **** FILE NAME : EDIT .001 SERVICE : FLIC VERSION · O01CO1 DATE : 98/02/11 MAX REC SIZE : 1024 FILE TYPE : LO LAST FILE : FILE HEADER FILE NUMBER: 1 EDITED MERGEDI~WD Depth shifted and clipped curves; all bit runs merged. DEPTH INCREMENT: 0.5000 FILE SUFk4ARY LDWG TOOL CODE START DEPTH STOP DEPTH MWD 8947.5 10847.5 $ BASELINE CURVE FOR SHIFTS: NONE CURVE SHIFT DATA (MEASURED DEPTH) BASELINE DEPTH .............. $ MERGED DATA SOURCE LDWG TOOL CODE .............. $ REMARKS: No depth shifts were applied to this data as per Troy Weiss via D. Douglas. $ .......... EQUIVALENT UNSHIFTED DEPTH .......... BIT RUN NO. MERGE TOP MERGE BASE 1 8947.5 9535.0 2 9535.0 10190.0 3 10125.0 10847.5 LIS FORMAT DATA LIS Tape Verification Listing Schlumberger Alaska Computing Center l'2-FEB-1998 08:45 .~GE: ** DATA FORMAT SPECIFICATION RECORD ** ** SET TYPE- 64EB ** .............................. TYPE REPR CODE VALUE .............................. 1 66 0 2 66 0 3 73 36 4 66 255 5 66 6 73 7 65 8 68 0.5 9 65 FT 11 66 28 12 68 13 66 0 14 65 FT 15 66 68 16 66 1 0 66 0 ** SET TYPE - CHAN ** NAME SERV UNIT SERVICE API API API API FILE NUMB NUMB SIZE REPR PROCESS ID ORDER # LOG TYPE CLASS MOD NUMB SAMP ELEM CODE (HEX) DEPT FT 39498 O0 000 O0 0 1 1 1 4 68 0000000000 ROP MWD F/HR 39498 O0 000 O0 0 1 1 1 4 68 0000000000 FET MWD HR 39498 O0 000 O0 0 1 1 1 4 68 0000000000 GR MWD GAPI 39498 O0 000 O0 0 1 1 1 4 68 0000000000 RPXXMWD 0H~39498 O0 000 O0 0 1 1 1 4 68 0000000000 RPX MWD OH~4M39498 O0 000 O0 0 1 1 1 4 68 0000000000 RPS MWD 0H~39498 O0 000 O0 0 1 1 1 4 68 0000000000 RPM MWD 0Pi~39498 O0 000 O0 0 1 i 1 4 68 0000000000 RPD MWD OH~4M39498 O0 000 O0 0 1 1 1 4 68 0000000000 ** DATA ** DEPT. 8947.500 ROP.MWD -999.250 FET.MWD -999.250 GR.MWD RPXX.MWD -999.250 RPX.MWD -999.250 RPS.MWD -999.250 RPM.MWD RPD.MWD -999.250 DEPT. 9000.000 ROP.MWD 17.430 FET.MWD -999.250 GR.MWD RPXX.MWD -999.250 RPX.MWD -999.250 RPS.MWD -999.250 RPM. MWD RPD.MWD -999.250 96.860 -999.250 108.490 -999.250 LIS Tape Verification Listing Schlumberger Alaska Computing Center 12-FEB-1998 08:45 .nGE: DEPT. 9500.000 ROP.MWD RPXX.MWD -999.250 RPX.MWD RPD.MWD -999.250 DEPT. 10000.000 ROP.MWD RPXX.MWD 30.480 RPX.MWD RPD.MWD 52.190 DEPT. 10500.000 ROP.MWD RPXX.MWD 30.340 RPX.MWD RPD.MWD 51.000 DEPT. 10847.500 ROP.MWD RPXX.MWD -999.250 RPX.MWD RPD.MWD -999.250 1205.550 FET.M~rD -999.250 -999.250 RPS.MWD -999.250 37.820 FET.MWD 35.530 RPS.MWD 42.960 FET.MWD 35.980 RPS.MWD 2.127 40.160 3.313 41.830 51.290 FET.MWD -999.250 -999.250 RPS.MWD -999.250 GR. MWD RPM. MWD GR. MWD RPM.MWD GR. MWD RPM. MWD GR. MWD RPM. MWD 49.963 -999.250 74.510 45. 750 68. 460 47.240 -999.250 -999.250 ** END OF DATA ** **** FILE TRAILER **** FILE NAME : EDIT .001 SERVICE : FLIC VERSION - O01CO1 DATE : 98/02/11 ~REC SIZE : 1024 FILE TYPE : LO LAST FILE : **** FILE H~ER **** FILE NAME : EDIT .002 SERVICE : FLIC VERSION ' O01CO1 DATE : 98/02/11 MAX REC SIZE : 1024 FILE TYPE : LO LAST FILE : FILE HEADER FILE IVTJAiBER 2 RAW MWD Curves and log header data for each bit run in separate files. BIT RUN NUMBER: 1 DEPTH INCREMENT: O. 5000 FILE S~Y VENDOR TOOL CODE START DEPTH STOP DEPTH MWD 8947.5 9535.0 $ LIS Tape Verification Listing Schlumberger Alaska Computing Center 12-FEB-1998 08:45 ~AGE : LOG HEADER DATA DATE LOGGED: SOFTWARE: SURFACE SOFTWARE VERSION: DOWNHOLE SOFTWARE VERSION: DATA TYPE (MEMORY or REAL-TIME): TD DRILLER (FT) : TOP LOG INTERVAL (FT) : BOTTOM LOG INTERVAL (FT) : BIT ROTATING SPEED (RPM) : HOLE INCLINATION (DEG) MINIMUM ANGLE: MAXIMUM ANGLE: TOOL STRING (TOP TO BOTTOM) VENDOR TOOL CODE TOOL TYPE GR GAMMA RAY $ BOREHOLE AND CASING DATA OPEN HOLE BIT SIZE (IN) DRILLERS CASING DEPTH (FT) BOREHOLE CONDITIONS MUD TYPE: MUD DENSITY (LB/G): MUD VISCOSITY (S) : MUD PH: MUD CHLORIDES (PPM) : FLUID LOSS (C3): RESISTIVITY (OI~ff~) AT TEMPERATURE (DEGF) : MUD AT MEASO-RED TEMPERATURE (MT) : MUD AT MAX CIRCULATIONG TEMPERATURE : MUD FILTRATE AT (MT): MUD CAKE AT (MT): NEUTRON TOOL MATRIX: MATRIX DENSITY: HOLE CORRECTION (IN): TOOL STANDOFF (IN): EWR FREQUENCY (HZ): REMARKS: MWD GR RUN FROM 8948' TO 9535' ARC5 RUN9535' TO TD IN TWO BIT RUNS RUN2 BIT TO GR:65.2'; TO RES:61.2' RUN3 BIT TO GR:80.6'; TO RES:76.5' $ LIS FORMAT DATA 29-MAR-97 5.OB 8X5-538 REAL-TIME 10848.0 8948.0 10848.0 20 92.8 98.1 TOOL NUMBER ........... M-10 MWD GR 8.500 3066.0 LSND 8.90 45.0 2.090 70.0 LIS Tape Verification Listing Schlumberger Alaska Computing Center 12-FEB-1998 08:45 ~GE: ** DATA FORMAT SPECIFICATION RECORD ** SET TYPE - 64EB ** TYPE REPR CODE VALUE 1 66 0 2 66 0 3 73 12 4 66 255 5 66 6 73 7 65 8 68 0.5 9 65 FT 11 66 85 12 68 13 66 0 14 65 FT 15 66 68 16 66 1 0 66 1 ** SET TYPE - CHAN ** NAME SERV UNIT SERVICE API API API API FILE NUMB NUMB SIZE REPR PROCESS ID ORDER # LOG TYPE CLASS MOD NUMB SAMP ELEM CODE (HEX) DEPT FT 39498 O0 000 O0 0 2 1 1 4 68 0000000000 ROP5 LW1 F/HR 39498 O0 000 O0 0 2 1 1 4 68 0000000000 GR LW1 GAPI 39498 O0 000 O0 0 2 1 1 4 68 0000000000 ** DATA ** DEPT. 8945. 000 ROPS. LW1 -999. 250 GR. LW1 - 999. 250 DEPT. 9000. 000 ROPS.LW1 17. 430 GR.LW1 108. 490 DEPT. 9500. 000 ROPS. LW1 1205. 550 GR. LW1 49. 963 DEPT. 9535.000 ROPS.LW1 150.800 GR.LW1 31.910 ** END OF DATA ** LIS Tape Verification Listing Schlumberger Alaska Computing Center 12-FEB-1998 08:45 rAGE: **** FILE TRAILER **** FILE NA~E : EDIT .002 SERVICE : FLIC VERSION : O01CO1 DATE : 98/02/11 MAX REC SIZE : 1024 FILE TYPE : LO LAST FILE : **** FILE HEADER **** FILE NAME : EDIT .003 SERVICE : FLIC VERSION : O01CO1 DATE : 98/02/11 MAX REC SIZE : 1024 FILE TYPE : LO LAST FILE : FILE HEADER FILE NUMBER 3 RAW MWD Curves and log header data for each bit run in separate files. BIT RUN NUMBER: 2 DEPTH INCREMENT: O. 5000 FILE SUN~ffAR Y VENDOR TOOL CODE START DEPTH STOP DEPTH MWD 9535.0 10190.0 $ LOG HEADER DATA DATE LOGGED: SOFTWARE: SURFACE SOFTWARE VERSION: DOWNHOLE SOFTWARE VERSION: DATA TYPE (MEMORY or REAL-TIME): TD DRILLER (FT) : TOP LOG INTERVAL (FT) : BOTTOM LOG INTERVAL (FT) : BIT ROTATING SPEED (RPM) : HOLE INCLINATION (DEG) MINIMUM ANGLE: MAXIMUM ANGLE: TOOL STRING (TOP TO BOTTOM) VENDOR TOOL CODE TOOL TYPE ......................... ARC5 RESIST./GR $ 29-MAR-97 5.OB 8X5-538 MEMORY 10848.0 8948.0 10848.0 70 85.8 98.1 TOOL NUMBER ARC-5 063 LIS Tape Verification Listing Schlumberger Alaska Computing Center 12-FEB-1998 08:45 fAGE: BOREHOLE AND CASING DATA OPEN HOLE BIT SIZE (IN) DRILLERS CASING DEPTH (FT) 8.500 3066.0 BOREHOLE CONDITIONS MUD TYPE: LSND MUD DENSITY (LB/G): 8.90 MUD VISCOSITY (S) : 45.0 MUD PH: MUD CHLORIDES (PPM) : FLUID LOSS (C3): RESISTIVITY (OH~) AT TEMPERATURE (DEGF) : MUD AT MEASURED TEMPERATURE (MT): 2. 090 MUD AT MAX CIRCULATIONG TEMPERATURE : MUD FILTRATE AT (MT): MUD CAKE AT (MT): NEUTRON TOOL MATRIX: MATRIX DENSITY: HOLE CORRECTION (IN): TOOL STANDOFF (IN): EWR FREQUENCY (HZ): REMARKS: MWD GR RUN FROM 8948' TO 9535' ARC5 RUN9535' TO TD IN TWO BIT RUNS RUN2 BIT TO GR:65.2'; TO RES:61.2' RUN3 BIT TO GR:80.6'; TO RES:76.5' $ LIS FORMAT DATA 20000 70.0 ** DATA FORMAT SPECIFICATION RECORD ** ** SET TYPE - 64EB ** TYPE REPR CODE VALUE 1 66 0 2 66 0 3 73 36 4 66 255 5 66 6 73 7 65 8 68 0.5 9 65 FT 11 66 28 12 68 13 66 0 14 65 FT LIS Tape Verification Listing Schlumberger Alaska Computing Center 12-FEB-1998 08:45 ~AGE: TYPE REPR CODE VALUE 15 66 68 16 66 1 0 66 1 ** SET TYPE - CHAN ** NAME SERVUNIT SERVICE API API API API FILE NUMB NUMB SIZE REPR PROCESS ID ORDER # LOG TYPE CLASS MOD NUMB SAMP ELEM CODE (HEX) DEPT FT 39498 O0 000 O0 0 3 1 1 4 68 0000000000 ROP5 LW2 F/HR 39498 O0 000 O0 0 3 1 1 4 68 0000000000 TAB LW2 HR 39498 O0 000 O0 0 3 1 1 4 68 0000000000 GR LW2 GAPI 39498 O0 000 O0 0 3 1 1 4 68 0000000000 PIOH LW2 0I~4M39498 O0 000 O0 0 3 1 1 4 68 0000000000 P16H LW2 0H~I39498 O0 000 O0 0 3 1 1 4 68 0000000000 P22H LW2 OHMM39498 O0 000 O0 0 3 1 1 4 68 0000000000 P28H LW2 OBk4M39498 O0 000 O0 0 3 1 1 4 68 0000000000 P34H LW2 OH~M39498 O0 000 O0 0 3 1 1 4 68 0000000000 ** DATA ** DEPT. 9535. 000 ROP5.LW2 O. 000 TAB.LW2 O . 000 GR. LW2 PIOH.LW2 O. 000 P16H. LW2 O. 000 P22H.LW2 O. 000 P28H. LW2 P34H. LW2 O. 000 DEPT. 10000. 000 ROP5.LW2 37. 820 TAB.LW2 2. 127 GR.LW2 PIOH. LW2 30.480 P16H. LW2 35.530 P22H.LW2 40.160 P28H.LW2 P34H. LW2 52.190 DEPT. 10190.000 ROP5.LW2 28.150 TAB.LW2 -999.250 GR.LW2 PIOH. LW2 -999.250 P16H.LW2 -999.250 P22H.LW2 -999.250 P28H.LW2 P34H. LW2 -999. 250 0.000 0.000 74.510 45.750 -999.250 -999.250 ** END OF DATA ** **** FILE TRAILER **** FILE NAME : EDIT .003 SERVICE : FLIC VERSION : O01CO1 DATE : 98/02/11 MAX REC SIZE : 1024 FILE TYPE : LO LAST FILE : LIS Tape Verification Listing Schlumberger Alaska Computing Center **** FILE HEADER **** FILE NAME : EDIT .004 SERVICE : FLIC VERSION : O01CO1 DATE : 98/02/11 MAX REC SIZE : 1024 FILE TYPE : LO LAST FILE 12-FEB-1998 08:45 10 FILE HEADER FILE NUMBER 4 RAW MWD Curves and log header data for each bit run in separate files. BIT RUN~BER: 3 DEPTH INCREMENT: 0.5000 FILE SUA~4ARY VENDOR TOOL CODE START DEPTH STOP DEPTH 10125.0 10847.5 LOG HEADER DATA DATE LOGGED: SOFTWARE: SURFACE SOFTWARE VERSION: DOWNHOLE SOFTWARE VERSION: DATA TYPE (MEMORY or REAL-TIME): TD DRILLER (FT) : TOP LOG INTERVAL (FT) : BOTTOM LOG INTERVAL (FT) : BIT ROTATING SPEED (RPM) : HOLE INCLINATION (DEG) MINI~ ANGLE: MAXIMU~ ANGLE: TOOL STRING (TOP TO BOTTOM) VENDOR TOOL CODE TOOL TYPE ARC5 RESIST./GR $ BOREHOLE AND CASING DATA OPEN HOLE BIT SIZE (IN): DRILLERS CASING DEPTH (FT) : BOREHOLE CONDITIONS MUD TYPE: MUD DENSITY (LB/G): MUD VISCOSITY (S) : MUD PH: MUD CHLORIDES (PPM) : 29-MAR-97 5. OB 8X5 - 538 MEMORY 10848.0 8948.0 10848.0 87.0 101.4 TOOL NUMBER ........... ARC-5 063 8.500 3066.0 LSND 8.90 45.0 LIS Tape Verification Listing Schlumberger Alaska Computing Center 12-FEB-1998 08:45 11 FLUID LOSS (C3): RESISTIVITY (0H~24) AT TEMPERATURE (DEGF) : MUD AT MEASURED TEMPERATURE (MT): MUD AT MAX CIRCULATIONG TEMPERATURE : MUD FILTRATE AT (MT): MUD CAKE AT (MT): NEUTRON TOOL MATRIX: MATRIX DENSITY: HOLE CORRECTION (IN) TOOL STANDOFF (IN): EWR FREQUENCY (HZ): ~KS: MWD GR RUN FROM 8948' TO 9535' ARC5 RUN9535' TO TD IN TWO BIT RUNS RUN2 BIT TO GR:65.2'; TO RES:61.2' RUN3 BIT TO GR:80.6'; TO RES:76.5' $ LIS FORMAT DATA 2. 090 20000 70.0 ** DATA FORMAT SPECIFICATION RECORD ** ** SET TYPE - 64EB ** TYPE REPR CODE VALUE .............................. 1 66 0 2 66 0 3 73 36 4 66 255 5 66 6 73 7 65 8 68 0.5 9 65 FT 11 66 28 12 68 13 66 0 14 65 FT 15 66 68 16 66 1 0 66 1 LIS Tape Verification Listing Schlumberger Alaska Computing Center ~ 12-FEB-1998 08:45 ** SET TYPE - CHAN ** NAME SERV UNIT SERVICE API API API API FILE NUMB NUMB SIZE REPR PROCESS ID ORDER # LOG TYPE CLASS MOD NUM~ SAMP ELEM CODE (HEX) DEPT FT 39498 O0 000 O0 0 4 1 1 4 68 0000000000 ROP5 LW3 F/HR 39498 O0 000 O0 0 4 1 1 4 68 0000000000 TAB LW3 HR 39498 O0 000 O0 0 4 1 1 4 68 0000000000 GR LW3 GAPI 39498 O0 000 O0 0 4 1 1 4 68 0000000000 PiOH LW3 0H~39498 O0 000 O0 0 4 1 1 4 68 0000000000 P16H LW3 0tff~39498 O0 000 O0 0 4 1 1 4 68 0000000000 P22H LW3 0H~9439498 O0 000 O0 0 4 1 1 4 68 0000000000 P28H LW3 OH~M39498 O0 000 O0 0 4 1 1 4 68 0000000000 P34H LW3 OH~M39498 O0 000 O0 0 4 1 1 4 68 0000000000 AGE: 12 ** DATA ** DEPT. 10125. 000 ROPS.LW3 -999.250 TAB.LW3 2.283 GR.LW3 PiOH.LW3 -999.250 P16H.LW3 -999.250 P22H.LW3 -999.250 P28H. LW3 P34H.LW3 -999. 250 DEPT. 10500. 000 ROPS.LW3 42. 960 TAB.LW3 3. 313 GR. LW3 PiOH. LW3 30. 340 P16H. LW3 35. 980 P22H.LW3 41 . 830 P28H.LW3 P34H. LW3 51 . 000 DEPT. 10847.500 ROPS.LW3 51.290 TAB.LW3 -999.250 GR.LW3 PiOH.LW3 -999.250 P16H.LW3 -999.250 P22H. LW3 -999.250 P28H. LW3 P34H. LW3 -999. 250 66.420 -999.250 68.460 47.240 -999.250 -999.250 ** END OF DATA ** **** FILE TRAILER **** FILE NAME : EDIT .004 SERVICE : FLIC VERSION · O01CO1 DATE : 98/02/11 MAX REC SIZE : 1024 FILE TYPE : LO LAST FILE : **** TAPE TRAILER **** SERVICE NAME : EDIT DATE : 98/02/11 ORIGIN : FLIC TAPE NAME : 98057 CONTINUATION # : 1 PREVIOUS TAPE : COI~4ENT : B.P. EXPLORATION, PRUDHOE BAY S-44 L1 PB1, API #50-029-22735-70 LIS Tape Verification Listing Schlumberger Alaska Com~uuting Center 12-FEB-1998 08:45 PAGE: 13 **** REEL TRAILER **** SERVICE NAME : EDIT DATE : 98/02/11 ORIGIN : FLIC REEL NAME : 98057 CONTINUATION # .. PREVIOUS REEL : COGENT : B.P. EXPLORATION, PRUDHOE BAY S-44 L1 PB1, API #50-029-22735-70 * ALASKA COMPUTING CENTER * . . ****************************** * ............................ . * ....... SCHLUMBERGER ....... * * ............................ . ****************************** COMPANY NAME : BP EXPLORATION WELL NAME : S-44 L1 FIELD NAME : PRUDHOE BAY BOROUGH : NORTH SLOPE STATE : ALASKA API NUMBER : 50-029-22735-60 REFERENCE NO : 97225 * ALASKA COMPUTING CENTER * * . ****************************** * ............................ * * ....... SCHLUMBERGER ....... * * ............................ * ****************************** COMPANY NAME : BP EXPLORATION WELL NAME : S-44 L1 FIELD NAME : PRUDHOE BAY BOROUGH : NORTH SLOPE STATE : ALASKA API NUMBER : 50-029-22735-60 REFERENCE NO : 97225 LIS Tape Verification ~isting ~chlumberger Alaska Computing Center 6-FEB-1998 14:15 PAGE: **** REEL HEADER **** SERVICE NAME : EDIT DATE : 98/02/ 6 ORIGIN : FLIC REEL NAME : 97225 CONTINUATION # : PREVIOUS REEL : COI~VlENT : B.P. EXPLORATION, PRUDHOE BAY S-44 L1, API #50-029-22735-60 **** TAPE HEADER **** SERVICE NAME : EDIT DATE : 98/02/ 6 ORIGIN : FLIC TAPE NAME : 97225 CONTINUATION # : 1 PREVIOUS TAPE : COI¢~4ENT : B.P. EXPLORATION, PRUDHOE BAY S-44 L1, API #50-029-22735-60 TAPE HEADER Prudhoe Bay MWD/~AD LOGS WELL NAME: API NUMBER: OPERATOR: LOGGING COMPANY: TAPE CREATION DATE: JOB DATA JOB NUMBER: LOGGING ENGINEER: OPERATOR WITNESS: SURFACE LOCATION BIT RUN 1 97225 BROWN WHITLEY SECTION: TOWNSHIP: RANGE: FNL: FSL: FEL: FWL: ELEVATION(FT FROM MSL O) KELLY BUSHING: DERRICK FLOOR: GROUND LEVEL: WELL CASING RECORD 1ST STRING 2ND STRING S-44 L1 500292273560 BP Exploration SCHLUMBERGER WELL SERVICES 6-FEB-98 BIT RUN 2 BIT RUN 3 35 12 12 66.20 66.20 36.50 OPEN HOLE CASING DRILLERS BIT SIZE (IN) SIZE (IN) DEPTH (F~ ................................ 8.500 9.625 3066.0 6.000 7.000 9535.0 LIS Tape Verification ~isting Schlumberger Alaska Computing Center 6-FEB-1998 14:15 3RD STRING PRODUCTION STRING REMARKS: Well drilled 10-MAR through 06-APR-97 with MWD GR and ARC%. Data was collected in 7 bit runs. The data from 8947' to 10340' from previous wellbore. $ $ PAGE: **** FILE HEADER **** FILE NAME : EDIT .001 SERVICE : FLIC VERSION : O01CO1 DATE : 98/02/ 6 MAX REC SIZE : 1024 FILE TYPE : LO LAST FILE : FILE HEADER FILE NUMBER: 1 EDITED MERGED MWD Depth shifted and clipped curves; all bit runs merged. DEPTH INCREMENT: 0.5000 FILE SUMMARY LDWG TOOL CODE START DEPTH STOP DEPTH MWD 8947.0 12487.0 $ BASELINE CURVE FOR SHIFTS: NONE CURVE SHIFT DATA (MEASURED DEPTH) BASELINE DEPTH .............. $ MERGED DATA SOURCE LDWG TOOL CODE .............. $ REMARKS: .......... EQUIVALENT UNSHIFTED DEPTH .......... ....... BIT RUN NO. MERGE TOP MERGE BASE 1 8947.0 12181.0 2 9524.0 10340.0 3 10280.0 10416.0 4 10333.5 11035.5 5 10942.0 12225.0 6 12181.0 12487.0 NO depth adjustments were made to this data as per D. Douglas. MWD GR data interpolated at AK ICS, after merging in the field. $ LIS Tape Verification ~lsting Schlumberger Alaska Computing Center 6-FEB-1998 14:15 PAGE: LIS FORMAT DATA ** DATA FORMAT SPECIFICATION RECORD ** ** SET TYPE - 64EB ** .............................. TYPE REPR CODE VALUE .............................. 1 66 0 2 66 0 3 73 36 4 66 255 5 66 6 73 7 65 8 68 O.5 9 65 FT 11 66 28 12 68 13 66 0 14 65 FT 15 66 68 16 66 1 0 66 0 ** SET TYPE - CHAN ** NAME SERV UNIT SERVICE API API API API FILE NUMB NUMB SIZE REPR PROCESS ID ORDER # LOG TYPE CLASS MOD NUMB SAMP ELEM CODE (HEX) DEPT FT 39498 O0 000 O0 0 1 1 1 4 68 0000000000 ROP MWD F/HR 39498 O0 000 O0 0 1 1 1 4 68 0000000000 FET MWD HR 39498 O0 000 O0 0 1 1 1 4 68 0000000000 GR MWD GAPI 39498 O0 000 O0 0 1 1 1 4 68 0000000000 RPXXMWD 0tflv~I39498 O0 000 O0 0 1 1 1 4 68 0000000000 RPX MWD 0PL~439498 O0 000 O0 0 1 1 1 4 68 0000000000 RPS MWD 0H~39498 O0 000 O0 0 1 1 1 4 68 0000000000 RPM MWD OPff4M39498 O0 000 O0 0 1 1 1 4 68 0000000000 RPD MWD OH~M39498 O0 000 O0 0 1 1 1 4 68 0000000000 ** DATA ** DEPT. 8947.000 ROP.MWD -999.250 FET.MWD -999.250 GR.MWD RPXX.MWD -999.250 RPX.MWD -999.250 RPS.MWD -999.250 RPM. MWD RPD.MWD -999.250 -999.250 -999.250 LIS Tape Verification ~sting Schlumberger Alaska Computing Center 6-FEB-1998 14:15 PAGE: DEPT. 9000.000 ROP.MWD RPXX.MWD -999.250 RPX.MWD RPD.MWD -999.250 DEPT. 10000. 000 ROP.MWD RPXX. MWD 30. 480 RPX. MWD RPD.MWD 52. 190 DEPT. 11000. 000 ROP.MWD RPXi~. MWD 6.030 RPX. MWD RPD . MWD 6. 840 DEPT. 12000.000 ROP.MWD RPXX.MWD 11.770 RPX.MWD RPD.MWD 11.780 DEPT. 12487.000 ROP.MWD RPX2~.~D -999.250 RPX.MWD RPD.MWD -999.250 17.430 FET.MWD -999.250 -999.250 RPS.MWD -999.250 37.820 FET.MWD 35.530 RPS.MWD 49.860 FET. MWD 6.350 RPS.MWD 79.650 FET.MWD 12.640 RPS.MWD 2.127 40.160 2. 063 6. 690 1.799 12.770 24.420 FET.MWD -999.250 -999.250 RPS.MWD -999.250 GR. MWD RPM. MWD GR. MWD RPM. MWD GR. MWD RPM.MWD GR. MWD RPM.MWD GR. MWD RPM. MWD 108.490 -999.250 72. 880 45. 750 49. 330 6. 870 37.220 12.280 -999.250 -999.250 ** END OF DATA ** **** FILE TRAILER **** FILE NAME : EDIT .001 SERVICE : FLIC VERSION : O01CO1 DATE : 98/02/ 6 MAX REC SIZE : 1024 FILE TYPE : LO LAST FILE : **** FILE HEADER **** FILE NAME : EDIT .002 SERVICE : FLIC VERSION : O01CO1 DATE : 98/02/ 6 MAX REC SIZE : 1024 FILE TYPE : LO LAST FILE : FILE HEADER FILENUMBER 2 RAW MWD Curves and log header data for each bit run in separate files. BIT RUTN 1VUMBER : 1 DEPTH INCREMENT: O . 5000 FILE SU~fl~ARY LIS Tape Verification J~isting Schlumberger Alaska Computing Center 6-FEB-1998 14:15 PAGE: VENDOR TOOL CODE START DEPTH MWD 8947.0 $ LOG HEADER DATA DATE LOGGED: SOFTWARE: SURFACE SOFTWARE VERSION: DOWNHOLE SOFTWARE VERSION: DATA TYPE (MEMORY or REAL-TIME): TD DRILLER (FT) : TOP LOG INTERVAL (FT) : BOTTOM LOG INTERVAL (FT) : BIT ROTATING SPEED (RPM) : HOLE INCLINATION (DEG) MINIMUM ANGLE: MAXIMUM ANGLE: STOP DEPTH .......... 9535.0 04 -APR-97 5.OB 8X5-538 REAL-TIME 12487.0 8947.0 12487.0 60 61.1 89.0 TOOL STRING (TOP TO BOTTOM) VENDOR TOOL CODE TOOL TYPE ......................... GR GA~A RAY $ TOOL NUMBER ........... M-10 MWD GR BOREHOLE AND CASING DATA OPEN HOLE BIT SIZE (IN): DRILLERS CASING DEPTH (FT) : 8.500 3066.0 BOREHOLE CONDITIONS MUD TYPE: LSND MUD DENSITY (LB/G): 8.80 MUD VISCOSITY (S) : 47.0 MUD PH: MUD CHLORIDES (PPM) : FLUID LOSS (C3): RESISTIVITY (OH~M) AT TEMPERATURE (DEGF) : MUD AT MEASURED TEMPERATURE (MT): 2. 090 MUD AT MAX CIRCULATIONG TEMPERATURE : MUD FILTRATE AT (MT): MUD CAKE AT (MT): 70.0 NEUTRON TOOL MATRIX: MATRIX DENSITY: HOLE CORRECTION (IN): TOOL STANDOFF (IN): EWR FREQUENCY (HZ): DATA FROM 8947' TO 10340' FROM PREVIOUS WELLBORE ~ GR RU~VFROM 8947' TO 9535' ARC5 RUN IN 6" HOLE SECTION PREVIOUS HOLE KICKED OFF AT 9535' $ LIS Tape Verification ~isting Schlumberger Alaska Computing Center 6-FEB-1998 14:15 PAGE: LIS FORMAT DATA ** DATA FORMAT SPECIFICATION RECORD ** ** SET TYPE - 64EB ** .............................. TYPE REPR CODE VALUE 1 66 0 2 66 0 3 73 12 4 66 255 5 66 6 73 7 65 8 68 0.5 9 65 FT 11 66 85 12 68 13 66 0 14 65 FT 15 66 68 16 66 1 0 66 1 ** SET TYPE - CHAN ** NA~E SERV UNIT SERVICE API API API API FILE NUMB NUMB SIZE REPR PROCESS ID ORDER # LOG TYPE CLASS MOD NUMB SAMP ELEM CODE (HEX) DEPT FT 39498 O0 000 O0 0 2 1 1 4 68 0000000000 ROP LW1 F/HR 39498 O0 000 O0 0 2 1 1 4 68 0000000000 GR LW1 GAPI 39498 O0 000 O0 0 2 1 1 4 68 0000000000 ** DATA ** DEPT. 8947.000 ROP. LW1 - 999.250 GR. LW1 - 999.250 DEPT. 9000. 000 ROP. LW1 17.430 GR. LW1 108. 490 DEPT. 9535. 000 ROP. LW1 -999. 250 GR. LW1 O. 000 ** END OF DATA ** LIS Tape Verification ~lsting Schlumberger Alaska Computing Center 6-FEB-1998 14:15 PAGE: **** FILE TRAILER **** FILE NAME : EDIT .002 SERVICE : FLIC VERSION · O01CO1 DATE : 98/02/ 6 MAX REC SIZE : 1024 FILE TYPE : LO LAST FILE : **** FILE H~ER **** FILE NAME : EDIT .003 SERVICE : FLIC VERSION · O01CO1 DATE : 98/02/ 6 MAX REC SIZE : 1024 FILE TYPE : LO LAST FILE : FILE HEADER FILE NUMBER 3 RAW MWD Curves and log header data for each bit run in separate files. BIT RUN NUMBER: 2 DEPTH INCREMENT: O . 5000 FILE S07V~!ARY VENDOR TOOL CODE START DEPTH STOP DEPTH 9524.0 10340.0 LOG HEADER DATA DATE LOGGED: SOFTWARE: SURFACE SOFTWARE VERSION: DOWNHOLE SOFTWARE VERSION: DATA TYPE (MEMORY or REAL-TIME): TD DRILLER (FT): TOP LOG INTERVAL (FT) : BOTTOM LOG INTERVAL (FT) : BIT ROTATING SPEED (RPM) : HOLE INCLINATION (DEG) MINIMUM ANGLE: MAXIMUM ANGLE: TOOL STRING (TOP TO BOTTOM) VENDOR TOOL CODE TOOL TYPE ......................... ARC5 RESIST./GR $ 04-APR-97 5.OB 8X5-538 MEMORY 12487.0 8947.0 12487.0 70 89.0 92.5 TOOL NUMBER ARC-5 016 LIS Tape Verification ~=sting Schlumberger Alaska Computing Center 6-FEB-1998 14:15 PAGE: BOREHOLE AND CASING DATA OPEN HOLE BIT SIZE (IN): DRILLERS CASING DEPTH (FT) : 8.500 3066.0 BOREHOLE CONDITIONS MUD TYPE: LSND MUD DENSITY (LB/G): 8.80 MUD VISCOSITY (S) : 47.0 MUD PH: MUD CHLORIDES (PPM) : FLUID LOSS (C3): RESISTIVITY (OH~4) AT TEMPERATURE (DEGF) : MUD AT MEASURED TEMPERATURE (MT): 2.090 MUD AT MAX CIRCULATIONG TEMPERATURE : MUD FILTRATE AT (MT): MUD CAKE AT (MT): 70.0 NEUTRON TOOL MATRIX: MATRIX DENSITY: HOLE CORRECTION (IN): TOOL STANDOFF (IN): EWR FREQUENCY (HZ): REMARKS: DATA FROM 8947' TO 10340' FROM PREVIOUS WELLBORE MWD GR RUN FROM 8947' TO 9535' ARC5 RUN IN 6" HOLE SECTION PREVIOUS HOLE KICKED OFF AT 9535' $ LIS FORlVi~T DATA ** DATA FORMAT SPECIFICATION RECORD ** ** SET TYPE- 64EB ** TYPE REPR CODE VALUE 1 66 0 2 66 0 3 73 36 4 66 255 5 66 6 73 7 65 8 68 0.5 9 65 FT 11 66 28 12 68 13 66 0 14 65 FT LIS Tape Verification ~lsting Schlumberger Alaska Computing Center 6-FEB-1998 14:15 PAGE: TYPE REPR CODE VALUE 15 66 68 16 66 1 0 66 1 ** SET TYPE - CHAN ** NAME SERV UNIT SERVICE API API API API FILE NUMB NUMB SIZE REPR PROCESS ID ORDER # LOG TYPE CLASS MOD NUMB SAMP ELEM CODE (HEX) DEPT FT 39498 O0 000 O0 0 3 1 1 4 68 0000000000 ROP5 LW2 F/HR 39498 O0 000 O0 0 3 1 1 4 68 0000000000 TAB LW2 HR 39498 O0 000 O0 0 3 1 1 4 68 0000000000 GR LW2 GAPI 39498 O0 000 O0 0 3 1 1 4 68 0000000000 PiOH LW2 0P~4~39498 O0 000 O0 0 3 1 1 4 68 0000000000 P16H LW2 0H~39498 O0 000 O0 0 3 1 1 4 68 0000000000 P22H LW2 0H1~t39498 O0 000 O0 0 3 1 1 4 68 0000000000 P28H LW2 0H~139498 O0 000 O0 0 3 1 1 4 68 0000000000 P34H LW2 0H~39498 O0 000 O0 0 3 1 1 4 68 0000000000 ** DATA ** DEPT. 9524.000 ROPS.LW2 -999.250 TAB.LW2 -999.250 GR.LW2 PiOH. LW2 -999.250 P16H. LW2 -999.250 P22H. LW2 -999.250 P28H. LW2 P34H.LW2 -999.250 DEPT. 10000.000 ROPS.LW2 37.820 TAB.LW2 2.127 GR.LW2 PiOH.LW2 30.480 P16H. LW2 35.530 P22H.LW2 40.160 P28H.LW2 P34H. LW2 52.190 DEPT. 10340.000 ROPS.LW2 32.850 TAB.LW2 -999.250 GR.LW2 PIOH. LW2 -999.250 P16H.LW2 -999.250 P22H. LW2 -999.250 P28H.LW2 P34H. LW2 -999. 250 -999.250 -999.250 72. 880 45. 750 -999.250 -999.250 END OF DATA ** **** FILE TRAILER **** FILE NAME : EDIT .003 SERVICE : FLIC VERSION : O01CO1 DATE : 98/02/ 6 MAX REC SIZE : 1024 FILE TYPE : LO LAST FILE : LIS Tape Verification ~isting Schlumberger Alaska Computing Center 6-FEB-1998 14:15 PAGE: 10 **** FILE HEADER **** FILE NAME : EDIT .004 SERVICE : FLIC VERSION : O01CO1 DATE : 98/02/ 6 MAX REC SIZE : 1024 FILE TYPE : LO LAST FILE : FILE HEADER FILE NUMBER 4 RAW MWD Curves and log header data for each bit run in separate files. BIT RUN NUMBER: 3 DEPTH INCREMENT: O. 5000 FILE SURfiVARY VENDOR TOOL CODE START DEPTH STOP DEPTH MWD 10280.0 10416.0 $ LOG HEADER DATA DATE LOGGED: SOFTWARE: SURFACE SOFTWARE VERSION: DOWNHOLE SOFTWARE VERSION: DATA TYPE (MEMORY or REAL-TIME): TD DRILLER (FT) : TOP LOG INTERVAL (FT) : BOTTOM LOG INTERVAL (FT) : BIT ROTATING SPEED (RPM) : HOLE INCLINATION (DEG) MINIMUM ANGLE: MAXIMUM ANGLE: TOOL STRING (TOP TO BOTTOM) VENDOR TOOL CODE TOOL TYPE ARC5 RESIST./GR $ BOREHOLE AND CASING DATA OPEN HOLE BIT SIZE (IN): DRILLERS CASING DEPTH (FT) : BOREHOLE CONDITIONS MUD TYPE: MUD DENSITY (LB/G): MUD VISCOSITY (S) : MUD PH: MUD CHLORIDES (PPM) : 04 -APR-97 5.OB 8X5-538 MEMORY 12487.0 8947.0 12487.0 90.8 92.0 TOOL NUMBER ........... ARC-5 016 8.500 3066.0 LSND 8.80 47.0 LIS Tape Verification ~isting Schlumberger Alaska Computing Center 6-FEB-1998 14 '.15 PAGE: 11 FLUID LOSS (C3) '. RESISTIVITY (0P24~) AT TE~IPERATURE (DEGF) : MUD AT MEASURED TEMPERATURE (MT): MUD AT MAX CIRCULATIONG TEMPERATURE : MUD FILTRATE AT (MT): MUD CAKE AT (MT): 2. 090 70.0 NEUTRON TOOL MATRIX: MATRIX DENSITY: HOLE CORRECTION (IN): TOOL STANDOFF (IN): EWR FREQUENCY (HZ): RE~JUgKS: DATA FROM 8947' TO 10340' FROM PREVIOUS WELLBORE MWD GR RUN FROM 8947' TO 9535' ARC5 RUN IN 6" HOLE SECTION PREVIOUS HOLE KICKED OFF AT 9535' $ LIS FORMAT DATA ** DATA FORMAT SPECIFICATION RECORD ** ** SET TYPE- 64EB ** .............................. TYPE REPR CODE VALUE 1 66 0 2 66 0 3 73 36 4 66 255 $ 66 6 73 7 65 8 68 0.5 9 65 FT 11 66 28 12 68 13 66 0 14 65 FT 15 66 68 16 66 1 0 66 1 ., LIS Tape Verification misting Schlumberger Alaska Computing Center 6-FEB-1998 14:15 PAGE: 12 ** SET TYPE - CHAN ** NAME SERV UNIT SERVICE API API API API FILE NUMB NUMB SIZE REPR PROCESS ID ORDER # LOG TYPE CLASS MOD NUMB SAMP ELEM CODE (HEX) DEPT FT 39498 O0 000 O0 0 4 1 1 4 68 0000000000 ROP5 LW3 F/HR 39498 O0 000 O0 0 4 1 1 4 68 0000000000 TAB LW3 HR 39498 O0 000 O0 0 4 1 1 4 68 0000000000 GR LW3 GAPI 39498 O0 000 O0 0 4 1 1 4 68 0000000000 PiOH LW3 0Ifl~439498 O0 000 O0 0 4 1 1 4 68 0000000000 P16H LW3 OH~k439498 O0 000 O0 0 4 1 1 4 68 0000000000 P22H LW3 OH~ff~39498 O0 000 O0 0 4 1 1 4 68 0000000000 P28H LW3 0H~39498 O0 000 O0 0 4 1 1 4 68 0000000000 P34H LW3 0H~39498 O0 000 O0 0 4 1 1 4 68 0000000000 ** DATA ** DEPT. 10280. 000 ROPS. LW3 -999. 250 TAB. LW3 4 . 490 GR. LW3 PIOH.LW3 -999.250 P16H. LW3 -999.250 P22H. LW3 -999.250 P28H. LW3 P34H. LW3 -999. 250 DEPT. 10416. 000 ROPS.LW3 57. 630 TAB.LW3 -999. 250 GR. LW3 PIOH.LW3 -999.250 P16H. LW3 -999.250 P22H.LW3 -999.250 P28H.LW3 P34H. LW3 -999. 250 68.220 -999.250 -999.250 -999.250 ** END OF DATA ** **** FILE TRAILER **** FILE NAME : EDIT .004 SERVICE : FLIC VERSION : 001 CO1 DATE : 98/02/ 6 MAX REC SIZE : 1024 FILE TYPE : LO LAST FILE : **** FILE HEADER **** FILE NAME : EDIT .005 SERVICE : FLIC VERSION : O01CO1 DATE : 98/02/ 6 MAX REC SIZE : 1024 FILE TYPE : LO LAST FILE : FILE HEADER LIS Tape Verification ~isting Schlumberger Alaska Computing Center 6-FEB-1998 14:15 PAGE: 13 FILE NUMBER 5 RAW MWD Curves a_nd log header data for each bit run in separate files. BIT RUN NUMBER: 4 DEPTH INCREMENT: O . 5000 FILE SU~ff4ARY VENDOR TOOL CODE START DEPTH STOP DEPTH 10333.5 11035.5 LOG HEADER DATA DATE LOGGED: SOFTWARE: SURFACE SOFTWARE VERSION: DOWNHOLE SOFTWARE VERSION: DATA TYPE (MEMORY or REAL-TIME): TD DRILLER (FT) : TOP LOG INTERVAL (FT) : BOTTOM LOG INTERVAL (FT) : BIT ROTATING SPEED (RPM) : HOLE INCLINATION (DEG) MINIMUM ANGLE: MAXIMUM ANGLE: TOOL STRING (TOP TO BOTTOM) VENDOR TOOL CODE TOOL TYPE ARC5 RESIST./GR $ BOREHOLE AND CASING DATA OPEN HOLE BIT SIZE (IN) : DRILLERS CASING DEPTH (FT) : BOREHOLE CONDITIONS MUD TYPE: MUD DENSITY (LB/G): MUD VISCOSITY (S) : MUD PH: MUD CHLORIDES (PPM) : FLUID LOSS (C3): RESISTIVITY (OH~4) AT TEMPERATURE (DEGF) : MUD AT MEASURED TEMPERATURE (MT): MUD AT MAX CIRCULATIONG TEMPERATURE : MUD FILTRATE AT (MT): MUD CAKE AT (MT): NEUTRON TOOL MATRIX: MATRIX DENSITY: HOLE CORRECTION (IN): TOOL STANDOFF (IN): 04 -APR-97 5.OB 8X5-538 MEMORY 12487.0 8947.0 12487.0 60 88.0 90.8 TOOL NUMBER ........... ARC-5 O16 8.500 3066.0 LSND 8.80 47.0 2.090 70.0 LIS Tape Verification ~isting Schlumberger Alaska Computing Center 6-FEB-1998 14:15 PAGE: 14 EWR FREQUENCY (HZ): REMARKS: DATA FROM 8947' TO 10340' FROM PREVIOUS WELLBORE MWD GR RUN FROM 8947' TO 9535' ARC5 RLrNIN 6" HOLE SECTION PREVIOUS HOLE KICKED OFF AT 9535' $ LIS FORMAT DATA ** DATA FORMAT SPECIFICATION RECORD ** ** SET TYPE- 64EB ** TYPE REPR CODE VALUE 1 66 0 2 66 0 3 73 36 4 66 255 5 66 6 73 7 65 8 68 0.5 9 65 FT 11 66 28 12 68 13 66 0 14 65 FT 15 66 68 16 66 1 0 66 1 ** SET TYPE - CHAN ** NAlVI~ SERV UNIT SERVICE API API API API FILE NUMB NUMB SIZE REPR PROCESS ID ORDER # LOG TYPE CLASS MOD NUMB SAMP ELEM CODE (HEX) DEPT FT 39498 O0 000 O0 0 5 1 1 4 68 0000000000 ROP5 LW4 F/HR 39498 O0 000 O0 0 5 1 1 4 68 0000000000 TAB LW4 HR 39498 O0 000 O0 0 5 1 1 4 68 0000000000 GR LW4 GAPI 39498 O0 000 O0 0 5 1 1 4 68 0000000000 PiOH LW4 0t~4~39498 O0 000 O0 0 5 1 1 4 68 0000000000 P16H LW4 0I~4M39498 O0 000 O0 0 5 1 1 4 68 0000000000 P22H LW4 OP2~ff439498 O0 000 O0 0 5 1 1 4 68 0000000000 P28H LW4 0H~I39498 O0 000 O0 0 5 1 1 4 68 0000000000 P34H LW4 0t~4~39498 O0 000 O0 0 5 1 1 4 68 0000000000 LIS Tape Verification =iSting Schlumberger Alaska Computing Center 6-FEB-1998 14:15 PAGE: 15 ** DATA ** DEPT. 10333. 500 ROPS. LW4 PiOH.LW4 5. 456 P16H. LW4 P34H. LW4 10. 020 DEPT. 11000. 000 ROP5.LW4 PiOH. LW4 7.188 P16H. LW4 P34H. LW4 7. 338 DEPT. 11035.500 ROPS. LW4 PiOH. LW4 7. 188 P16H. LW4 P34H. LW4 7.338 765.167 TAB. LW4 6. 359 P22H. LW4 49. 861 TAB. LW4 7. 267 P22H. LW4 66. 914 TAB. LW4 7. 267 P22H. LW4 O . 953 GR. LW4 6. 888 P28H.LW4 2. O17 GR. LW4 7. 313 P28H. LW4 2. O17 GR. LW4 7. 313 P28H. LW4 94. 898 7. 815 52.013 7.330 52.013 7.330 ** END OF DATA ** **** FILE TRAILER **** FILE NAME : EDIT .005 SERVICE : FLIC VERSION : O01CO1 DATE : 98/02/ 6 MAX REC SIZE : 1024 FILE TYPE : LO LAST FILE : **** FILE HEADER **** FILE NAME : EDIT .006 SERVICE : FLIC VERSION : O01CO1 DATE : 98/02/ 6 MAX REC SIZE : 1024 FILE TYPE : LO LAST FILE : FILE HEADER FILE AU]M~ER 6 RAW MWD Curves and log header data for each bit run in separate files. BIT RUN NUMBER: 5 DEPTH INCREMENT: 0.5000 FILE SUM~Lafl~Y VENDOR TOOL CODE START DEPTH STOP DEPTH f~WD 10942.0 12225.0 $ LOG HEADER DATA LIS Tape Verification ~isting Schlumberger Alaska Computing Center 6-FEB-1998 14:15 PAGE: 16 DATE LOGGED: SOFTWARE: SURFACE SOFTWARE VERSION: DOWNHOLE SOFTWARE VERSION: DATA TYPE (MEMORY or REAL-TIME): TD DRILLER (FT) : TOP LOG INTERVAL (FT) : BOTTOM LOG INTERVAL (FT) : BIT ROTATING SPEED (RPM) : HOLE INCLINATION (DEG) MINIMUM ANGLE: MAXIMUM ANGLE: TOOL STRING (TOP TO BOTTOM) VENDOR TOOL CODE TOOL TYPE ARC5 RESIST./GR $ 04-APR-97 5. OB 8X5 - 538 MEMORY 12487.0 8947.0 12487.0 60 87.6 88.8 TOOL NUMBER ........... ARC-5 016 BOREHOLE AND CASING DATA OPEN HOLE BIT SIZE (IN): DRILLERS CASING DEPTH (FT) : 8.500 3066.0 BOREHOLE CONDITIONS MUD TYPE: LSND MUD DENSITY (LB/G): 8.80 MUD VISCOSITY (S) : 47.0 MUD PHi MUD CHLORIDES (PPM) : FLUID LOSS (C3): RESISTIVITY (OH~4) AT TEMPERATURE (DEGF): MUD AT MEASURED TEMPERATURE (MT): 2. 090 MUD AT MAX CIRCULATIONG TEMPERATURE : MUD FILTRATE AT (MT): MUD CAKE AT (MT): 70.0 NEUTRON TOOL MATRIX: MATRIX DENSITY: HOLE CORRECTION (IN): TOOL STANDOFF (IN): EWR FREQUENCY (HZ): ~KS: DATA FROM 8947' TO 10340' FROM PREVIOUS WELLBORE MWD GR RUN FROM 8947' TO 9535' ARC5 RUN IN 6" HOLE SECTION PREVIOUS HOLE KICKED OFF AT 9535' $ LIS FORMAT DATA LIS Tape Verification ~sting Schlumberger Alaska Computing Center 6-FEB-1998 14:15 PAGE: 17 ** DATA FORMAT SPECIFICATION RECORD ** ** SET TYPE - 64EB ** .............................. TYPE REPR CODE VALUE i 66 0 2 66 0 3 73 36 4 66 255 5 66 6 73 7 65 8 68 0.5 9 65 FT 11 66 28 12 68 13 66 0 14 65 FT 15 66 68 16 66 1 0 66 1 ** SET TYPE - CHAN ** NAME SERV UNIT SERVICE API API API API FILE NUMB NUMB SIZE REPR PROCESS ID ORDER # LOG TYPE CLASS MOD NUMB SAMP ELEM CODE (HEX) DEPT FT 39498 O0 000 O0 0 6 1 1 4 68 0000000000 ROP5 LW5 F/HR 39498 O0 000 O0 0 6 1 1 4 68 0000000000 TAB LW5 HR 39498 O0 000 O0 0 6 1 1 4 68 0000000000 GR LW5 GAPI 39498 O0 000 O0 0 6 1 1 4 68 0000000000 PiOH LW5 0tfiv~39498 O0 000 O0 0 6 1 1 4 68 0000000000 P16H LW5 OH~ff439498 O0 000 O0 0 6 1 1 4 68 0000000000 P22H LW5 OH~M39498 O0 000 O0 0 6 1 1 4 68 0000000000 P28H LW5 OH~fl~39498 O0 000 O0 0 6 1 1 4 68 0000000000 P34H LW5 0H~4~39498 O0 000 O0 0 6 1 1 4 68 0000000000 ** DATA ** DEPT. 10942. 000 ROPS.LW5 -999.250 TAB.LW5 O. 194 GR.LW5 PiOH. LW5 6.440 P16H. LW5 6.959 P22H. LW5 7.347 P28H.LW5 P34H. LW5 7. 596 DEPT. 11000. 000 ROPS.LW5 -999.250 TAB.LW5 2. 064 GR.LW5 PiOH.LW5 6. 029 P16H. LW5 6. 345 P22H. LW5 6. 686 P28H.LW5 P34H. LW5 6. 844 DEPT. 12000. 000 ROP5. LW5 79. 652 TAB. r,W5 1 . 800 GR. LW5 PiOH. LW5 11. 766 P16H.LW5 12. 640 P22H.LW5 12. 775 P28H.LW5 P34H. LW5 11. 779 46.604 7.535 49.325 6.871 37.221 12. 283 L. IS Tape Verification ~isting Schlumberger Alaska Computing Center 6-FEB-1998 14:15 PAGE: 18 DEPT. 12225. 000 ROP5. LW5 P1 OH. LW5 10. 3 60 P16H. LW5 P34H. LW5 11. 514 268. 782 TAB. LW5 11. 095 P22H. LW5 3.536 11.682 GR. LW5 P2 8H. LW5 40.386 11.792 ** END OF DATA ** **** FILE TRAILER **** FILE NAME : EDIT .006 SERVICE : FLIC VERSION : O01CO1 DATE : 98/02/ 6 MAX REC SIZE : 1024 FILE TYPE : LO LAST FILE : **** FILE HEADER **** FILE NAME : EDIT .007 SERVICE : FLIC VERSION . O01CO1 DATE : 98/02/ 6 MAX REC SIZE : 1024 FILE TYPE : LO LAST FILE : FILE HEADER FILE NUMBER 7 RAW MWD Curves and log header data for each bit run in separate files. BIT RUN NUMBER: 6 DEPTH INCREMENT: 0.5000 FILE SUMMARY VENDOR TOOL CODE START DEPTH ~ 12181.0 $ LOG HEADER DATA DATE LOGGED: SOFTWARE: SURFACE SOFTWARE VERSION: DOWNHOLE SOFTWARE VERSION: DATA TYPE (MEMORY or REAL-TIME): TD DRILLER (FT) : TOP LOG INTERVAL (FT) : BOTTOM LOG INTERVAL (FT) '. BIT ROTATING SPEED (RPM) : STOP DEPTH 12487.0 04-APR-97 5.OB 8X5-538 MEMORY 12487.0 8947.0 12487.0 60 tiS Tape Verification ~sting Schlumberger Alaska Computing Center 6-FEB-1998 14:15 PAGE: 19 HOLE INCLINATION (DEG) MINIMUM ANGLE: MAXIMUM ANGLE: TOOL STRING (TOP TO BOTTOM) VENDOR TOOL CODE TOOL TYPE ARC5 RESIST./GR $ BOREHOLE AND CASING DATA OPEN HOLE BIT SIZE (IN): DRILLERS CASING DEPTH (FT) : 89.0 90.0 TOOL NUMBER ........... ARC-5 016 8.500 3066.0 BOREHOLE CONDITIONS MUD TYPE: LSND MUD DENSITY (LB/G): 8.80 MUD VISCOSITY (S) : 47.0 MUD PH: MUD CHLORIDES (PPM) : FLUID LOSS (C3): RESISTIVITY (OHNk4) AT TEMPERATURE (DEGF) : MUD AT MEASURED TEMPERATURE (MT): 2. 090 MUD AT MAX CIRCULATIONG TEMPERATURE : MUD FILTRATE AT (MT): MUD CAKE AT (MT): 70.0 NEUTRON TOOL MATRIX: MATRIX DENSITY: HOLE CORRECTION (IN): TOOL STANDOFF (IN): EWR FREQUENCY (HZ): REMARKS: DATA FROM 8947' TO 10340' FROM PREVIOUS WELLBORE MWD GR RUN FROM 8947' TO 9535' ARC5 RUN IN 6" HOLE SECTION PREVIOUS HOLE KICKED OFF AT 9535' $ LIS FORMAT DATA ** DATA FORMAT SPECIFICATION RECORD ** ** SET TYPE - 64EB ** TYPE REPR CODE VALUE 1 66 0 2 66 0 3 73 36 LIS Tape Verification ~sting Schlumberger Alaska Computing Center 6-FEB-1998 14:15 PAGE: 20 TYPE REPR CODE VALUE 4 66 255 5 66 6 73 7 65 8 68 0.5 9 65 FT 11 66 28 12 68 13 66 0 14 65 FT 15 66 68 16 66 1 0 66 1 ** SET TYPE - CHAN ** NAME SERV UNIT SERVICE API API API API FILE NUMB NUMB SIZE REPR PROCESS ID ORDER # LOG TYPE CLASS MOD NUMB SAMP ELEM CODE (HEX) DEPT FT 39498 O0 000 O0 0 7 1 1 4 68 0000000000 ROP5 LW6 F/HR 39498 O0 000 O0 0 7 1 1 4 68 0000000000 TAB LW6 HR 39498 O0 000 O0 0 7 1 1 4 68 0000000000 GR LW6 GAPI 39498 O0 000 O0 0 7 1 1 4 68 0000000000 PiOH LW6 OPiM~39498 O0 000 O0 0 7 1 1 4 68 0000000000 P16H LW6 0HM~39498 O0 000 O0 0 7 1 1 4 68 0000000000 P22H LW6 OPiM~39498 O0 000 O0 0 7 1 1 4 68 0000000000 P28H LW6 0Pi~I39498 O0 000 O0 0 7 1 1 4 68 0000000000 P34H LW6 OH~4~q39498 O0 000 O0 0 7 1 1 4 68 0000000000 ** DATA ** DEPT. 12181.000 ROPS.LW6 -999.250 TAB.LW6 2.330 GR.LW6 44.160 PIOH.LW6 -999.250 P16H.LW6 -999.250 P22H. LW6 -999.250 P28H. LW6 -999.250 P34H.LW6 -999.250 DEPT. 12487.000 ROP5.LW6 24.420 TAB.LW6 -999.250 GR.LW6 -999.250 PIOH. LW6 -999.250 P16H.LW6 -999.250 P22H.LW6 -999.250 P28H.LW6 -999.250 P34H. LW6 -999.250 ** END OF DATA ** LIS Tape Verification ~sting Schlumberger Alaska Computing Center 6-FEB-1998 14:15 PAGE: 21 **** FILE TRAILER **** FILE NAME : EDIT .007 SERVICE : FLIC VERSION : O01CO1 DATE : 98/02/ 6 MAX REC SIZE : 1024 FILE TYPE : LO LAST FILE : **** TAPE TRAILER **** SERVICE NAME .. EDIT DATE . 98/02/ 6 ORIGIN : FLIC TAPE NAME : 97225 CONTINUATION # : 1 PREVIOUS TAPE : CO~4~NT : B.P. EXPLORATION, PRUDHOE BAY S-44 L1, API #50-029-22735-60 **** REEL TRAILER **** SERVICE NAME : EDIT DATE · 98/02/ 6 ORIGIN : FLIC REEL NAME .. 97225 CONTINUATION # : PREVIOUS REEL : CO~!ENT : B.P. EXPLORATION, PRUDHOE BAY S-44 L1, API #50-029-22735-60