Alaska Logo
Department of Commerce, Community, and Economic Development
Alaska Oil and Gas Conservation
Commission
Loading...
HomeMy WebLinkAbout197-006 STATE OF ALASKA 1ASKA OIL AND GAS CONSERVATION COMM! N • WELL..OMPLETION OR RECOMPLETION REPO.i'AND LOG la. Well Status: Oil 0 Gas LI SPLUG 0 Other 0 Abandoned ID ' Suspended 0 lb.Well Class: 20AAC 25.105 20AAC 25.110 Development El Exploratory 0 GINJ 0 WINJ 0 WAG 0 WDSPL 0 No.of Completions: Zero • Service 0 Stratigraphic Test• 0 2. Operator Name: 6. Date Comp.,Susp(or Aband,.} 14.Permit to Drill Number/Sundry BP Exploration(Alaska),Inc 7/13/2015 .. 197-006 • 315-072 3. Address: 7. Date Spudded: 15' API Number: P.O.Box 196612 Anchorage,AK 99519-6612 3/2/1997 50-029-22735-00-00 • 4a. Location of Well(Governmental Section): 8. Date TD Reached: 16. Well Name and Number: 3/21/1997 PBU S-44 • Surface: 4242'FSL,4502'FEL,Sec.35,T12N,R12E,UM • 17. Field/Pool(s): 9. KB(ft above MSL): 67' ' Top of Productive Interval: 4563'FSL,2064'FEL,Sec.34,T12N,R12E,UM GL(ft above MSL): 36.5' • PRUDHOE BAY,PRUDHOE OIL Total Depth: 855'FSL,4886'FEL,Sec.27,T12N,R12E,UM 10. Plug Back Depth(MD/TVD): 18. Property Designation: • 2661'/2661' • ADL 028257•&028258 4b. 4b.Location of Well(State Base Plane Coordinates,NAD 27): 11. Total Depth(MD/TVD): 19. Land Use Permit Surface:x- 618930' y- 5980445 • Zone - ASP 4 • 13150'/8968' . TPI: x- 616083 y- 5980722 Zone - ASP 4 12. SSSV Depth(MD/TVD): 20 Thickness of Permafrost MD/TVD: Total Depth:x- 613234 y- 5982250 Zone - ASP 4 None 1900'(Approx.) 5. Directional Survey: Yes ❑ (attached) No Il 13. Water Death.if Offshore: 21. Re-drill/Lateral Top Window MD/TVD: Submit electronic and printed information per 20 AAC 25.050 N/A (ft MSL) N/A 22. Logs Obtained List all logs run and,pursuant to AS 31.05.030 and 20 AAC 25.071,submit all electronic data and printed logs within 90 days of completion, suspension,or abandonment,whichever occurs first.Types of logs to be listed include,but are not limited to:mud log, o ,caliper, resistivity,porosity,magnetic resonance,dipmeter,formation tester,temperature,cement evaluation,casing collar locale Acronyms may be used.Attach a separate page if necessary ���l111111���! iiiiii���........ MWD,GR,LWD:DIR/FE/DD,RES SCANNED AUG 0 4 2015 23. A,onr, ` CASING,LINER AND CEMENTING RECORD CASING WT.PER GRADE SETTING DEPTH MD SETTING DEPTH TVD HOLE SIZE CEMENTING RECORD AMOUNT FT. PULLED TOP BOTTOM TOP BOTTOM 20" 91.5# H-40 32' 112' 32' 112' 30" 260 sx Arctic Set(Approx.) 9-5/8" 40# L-80 32' 3132' 32' 3132' 12-1/4" 1181 sx Coldset III,430 sx Class'G' 7" 26# L-80 2910' 10205' 2910' 8946' 8-1/2" 620 sx Class'G' 2880' 4-1/2" 12.6# L-80 9939' 13130' 8901' 8969' 6" 130 sx Classs'G' 24. Open to production or injection? Yes 0 No WI 25. TUBING RECORD If Yes,list each interval open(MD/TVD of Top and Bottom;Perforation GRADE DEPTH SET(MD) PACKER SET(MD/TV Size and Number): 4-1/2",12.6#,13Cr80/L-80; 3220'-9245'; 9107'/8539';9239'/8626'; F+ 4-1/2", 12.6#.L-80 9542'-9576' 9542'/8767' 26. ACID,FRACTURE,CEMENT SQUEEZE,ETC. 1..r 1 Was hydraulic fracturing used during completion? Yes ❑ No II • Per 20 AAC 25.283(i)(2)attach electronic and printed information DEPTH INTERVAL(MD) AMOUNT AND KIND OF MATERIAL USED See Attachment 27. PRODUCTION TEST Date First Production: Not on Production Method of Operation(Flowing,gas lift,etc.):N/A Date of Test: Hours Tested: Production for Oil-Bbl: Gas-MCF: Water-Bbl: Choke Size: Gas-Oil Ratio: Test Period ...► Flow Tubing Casing Press: Calculated Oil-Bbl: Gas-MCF: Water-Bbl: Oil Gravity-API(corr): Press 24 Hour Rate ak.41. �//^^ Form 10-407 Revised 5/2015 CONTINUED ON PAGE 2 Submit ORIGINAL only /,r V7L q /2//5- e r ---. .v.'v,E,•/s' RBDM ` AUG 1 4 2015 28. CORE DATA Conventional Core(s) Yes 0 No El Sidewall Cores Yes 0 No 2 • If Yes to either question,list formations and intervals cored(MD+TVD of top and bottom of each),and summarize lithology and presence of oil,gas or water (submit separate sheets with this form,if needed).Submit detailed descriptions,core chips,photographs and laboratory analytical results per 20 AAC 25.071. 29. GEOLOGIC MARKERS(List all formations and markers encountered): 30. FORMATION TESTS NAME MD TVD Permafrost-Top Well Tested? Yes 0 No El Permafrost-Base If yes,list intervals and formations tested,briefly summarizing test results.Attach separate sheets to this form,if needed,and submit detailed test information per 20 Sag River 9498' 8748' AAC 25.071. Shublik 9584' 8786' Sadlerochit 9841' 8874' Formation at total depth: 31. List of Attachments: Summary of Pre-Rig Work,Summary of Daily Drilling Reports.Well Schematic Diagram Information to be attached includes,but is not limited to:summary of daily operations,wellbore schematic,directional or inclination survey,core analysis,paleontological report,production or well test results,per 20 AAC 25.070. 32.I hereby certify that the foregoing is true and correct to the best of my knowledge. Contact: Leemhuis,Jacob Email: Jacob.Leemhuis@bp.com Printed Name: Joe Lastu Title: Drilling Technologist Signature: j _Phone: +1 907 564 4091 Date: evesn'S ,\ INSTRUCTIONS General:This form is designed for submitting a complete and correct well completion report and log on all types of lands and leases in Alaska.Submit a well schematic diagram with each 10-407 well completion report and 10-404 well sundry report when the downhole well design is changed. All laboratory analytical reports regarding samples or tests from a well must be submitted to the AOGCC,no matter when the analyses are conducted. Item 1 a. Multiple completion is defined as a well producing from more than one pool with production from each pool completely segregated.Each segregated pool is a completion. Item 1 b.Well Class Service wells:Gas Injection,Water Injection,Water-Alternating-Gas Injection,Salt Water Disp,Water Supply for Injection,Observation or Other. Item 4b.TPI(Top of Producing Interval). Item 9. The Kelly Bushing and Ground Level elevations in feet above mean sea level.Use same as reference for depth measurements given in other spaces on this form and in any attachments. Item 15.The API number reported to AOGCC must be 14 digits(ex:50-029-20123-00-00). Item 20.Report true vertical thickness of permafrost in Box 20.Provide MD and TVD for the top and base of permafrost in Box 29. Item 22.Review the reporting requirements of 20 AAC 25.071 and,pursuant to AS 31.05.030,submit all electronic data and printed logs within 90 days of completion,suspension,or abandonment,whichever occurs first. Item 23.Attached supplemental records should show the details of any multiple stage cementing and the location of the cementing tool. Item 24.If this well is completed for separate production from more than one interval(multiple completion),so state in item 1,and in item 23 show the producing intervals for only the interval reported in item 26.(Submit a separate form for each additional interval to be separately produced, showing the data pertinent to such interval). Item 27.Method of Operation:Flowing,Gas Lift,Rod Pump,Hydraulic Pump,Submersible,Water Injection,Gas Injection,Shut-in,or Other(explain). Item 28.Provide a listing of intervals cored and the corresponding formations,and a brief description in this box.Submit detailed description and analytical laboratory information required by 20 MC 25.071. Item 30.Provide a listing of intervals tested and the corresponding formation,and a brief summary in this box.Submit detailed test and analytical laboratory information required by 20 AAC 25.071. Item 31.Pursuant to 20 MC 25.070,attach to this form:well schematic diagram,summary of daily well operations,directional or inclination survey,and other tests as required including,but not limited to:core analysis,paleontological report,production or well test results. Form 10-407 Revised 5/2015 Submit ORIGINALOnly RBDM$'\\ AUG 1 4 2015 WELL NAME: S-44 / L1 26. Acid, Fracture, Cement Squeeze, Etc. Depth Interval (MD) Amount & Kind of Material Used 9159' Set Cement Retainer 9088' 123 Bbls Class 'G' 7703' 41 Bbls Class 'G' 3220' Cut & Pull Tubing 2910' Cut & Pull 7" Casing 2764' Set EZSV 2743' Set Whipstock 2682' Set 2nd EZSV 2661' Set 2nd Whipstock S-44 / LI, Well History (Pre-Rig Sidetrack) T/I/O=SSV/650/150, Temp=Sl. PPPOT-T (PASS), PPPOT-IC (PASS), pre RST. PPPOT-T: Stung into test void (100 psi), bled void to 0 psi. Functioned LDS, all moved freely. Torqued to 400 ft/lbs. Pumped through void, good returns. Pressured test void to 5,000 psi for 30 minute test, lost 100 psi in 15 minutes, lost 50 psi in second 15 minutes. (PASS) Bled void to 0 psi. PPPOT-IC: Stung into test void (0+ psi), bled void to 0 psi. Functioned LDS, all moved freely. Torqued to 400 ft/lbs. Pumped through void, good returns. Pressured test void to 3,500 psi for 30 minute test, lost 100 psi 5/6/2015 in 15 minutes, lost 0 psi in second 15 minutes. (PASS) Bled void to 0 psi. (HES ELINE: SET CEMENT RETAINER). UNIT STUCK WHILE TRYING TO SPOT. CALL FOR 5/12/2015 ROADS AND PADS. T/I/0=2027/697/146, Temp= SI Assist E-line (Load and test) Loaded tubing with 5 bbls neat meth followed by 300 bbls 1%KCL and a 70 bbls diesel freeze protect. E-line set Cement Retainer. Pressured up IA with additional 6 bbls diesel to reach 2525 psi. MIT-T lost 59 psi i 1st 15 minutes and 7 psi i 2nd 15 minutes for a total loss of 66 psi in a 30 minutes test. Bled down tbg psi (-4 bbls). 5/13/2015 E-line on well upon departure. FWHP's= 200/410/235. (HES ELINE: SET CEMENT RETAINER). RIG UP PCE AND SETTING TOOL, PRESSURE TEST TO 300 PSI LOW AND 3500 PSI HIGH. RIH WITH 4-1/2" HES EZ-DRILL SQUEEZE PACKER (CORRELATE TO TUBING DETAIL RECORD DATED 24-JUN-06). SET PACKER ME @ 9160' MD. (TOP © 9159' MD). CONDUCT MIT-T WITH TOOL AT SURFACE. RIG DOWN. WELL LEFT 5/13/2015 SHUT IN - DSO NOTIFIED. CTU#6 1.75" CT (P&A- Pre Rig). MIRU. Perform Weekly BOP Test. RIH w/ HES Cmt Retainer Stinger. Circulate safelube while rih. Dry tag retainer @ 9153'. Pumping down backside and circ P tracking WHP, not stung in. Unsting and try again. Pressure WHP to 400psi while pumping cement. 6/1/2015 Pump 123 bbls of 15.8ppg Class G cement. T/I/O - 550/20/175 Assist Slickline MIT T PASSED to 2500 psi. (Post cement) Pumped 1 bbl neat to reach test presure tbg lost 29 and 12 psi for a good test bleed tbg back to 300 rig down (slickline 6/2/2015 on we'll has control annulus valves open to gauges ) FWHP=300/7/166. CTU#6 1.75" CT (P&A- Pre Rig). Displace 123bbls cement below retainer. Unsting and lay in 1 bbl cement on top of retainer(TOC = 9088'). Reverse out and POOH. Freeze protect tubing w/38bbls 6/2/2015 50/50 methanol. RDMO. LRS PERFORMS PASSING MIT-T. DRIFTED W/3.70" CENT., 2-1/2" SAMPLE BAILER, S/D & TAG CEMENT @ 9,099' SLM ( NO SAMPLE). DRIFTED W/3.25" CENT., 1-3/4" SAMPLE BAILER, 6/2/2015 S/D &TAG CEMENT © 9,099' SLM. PULL STA#1 BK-DMY © 9,001' SLM/9,016' MD(leaving as open pocket for circ). DRIFTED W/ 6/3/2015 20' 3.70" DMY WHIPSTOCK TO 2,500' SLM. Job Scope: Fullbore Balance Cement Plug T/I/O 59/680/160. Spot and R/U SLB, LRS and CH2MHill equipment. PJSM. Went over Well Entry Checklist, BP Safety Plan and Contractor Self- Verification. Pressure test SLB and LRS equipment. Crew c/o complete, PJSM. Pumped the job per for the following schedule. All diesel was pumped by LRS: 269 BBL's of fresh water, 86 BBL's of diesel, 89 BBL's fresh water, 41 BBL's 15.8 ppg class 'G' cement, 2 BBL's fresh water(diverted flow through ball launcher and dropped ball), 5 BBL's fresh water(opened all valves on ball launcher), 66 BBL's fresh water, 46 BBL's diesel. T/I/O 22/209/158. Length of cement plug: 1313'. Depth of cement plug: 7703' MD. Type of cement: Class 'G' cement. Weight of cement: 15.8 ppg. Volume of 6/4/2015 cement slurry pumped: 41 BBL's. UCA= 2100 psi @ 17h:23m. T/I/O=60/10/120 Assist SLB w/cement job. Pumped a total of 132 bbls of diesel in two segments assisting cementers. Pumped 6 bbls of diesel to flush return lines to tanks Final WHP = 6/4/2015 240/250/130. 6/5/2015 T/I/O=0/0/0 Temp=SI CMIT-TxIA and MIT-OA (SIDE TRACK) SU/PJSM, RU/PT. BPV PROFILE BRUSHED FOR 1/2 HR. UNABLE TO DRIFT PAST 7,486' SLM W/3.68" CENT. DRIFT TO TOP OF CEMENT @ 7,688' SLM W/2.15" CENT & 1-3/4" S. BAILER, OBTAIN GOOD 6/5/2015 SAMPLE OF CEMENT. S-44 / LI, Well History (Pre-Rig Sidetrack) (SLB E-LINE TUBING CUT). INITIAL T/I/O = 90/180/160. MIRU. PT. RIH WITH 3.65" POWER JET CUTTER AND CUT TUBING AT 3220'. TIED INTO TUBING TALLY DATED 4/22/9. GOOD INDICATION OF CUT AT SURFACE. POOH. RDMO. FINIAL T/I/O = 110/60/160. WELL SHUT IN 6/6/2015 UPON DEPARTURE - DSO NOTIFIED. CMIT-TxIA to 2500 psi PASS, MIT-OA to 3000 FAIL (never reached test pressure). Pumped 3.6 bbls of DSL down Tbg and IA on 2 CMIT-TxIA tests. 2nd Test took Tbg to 2522 psi and IA to 2525 psi. 1st 15 mins Tbg lost 25 psi/ IA lost 42 psi. 2nd 15 mins Tbg lost 18 psi/ IA lost 21 psi. Total Test Tbg lost 43 psi/ IA lost 63 psi. PASS. Pumped 3 bbls down OA for MIT to 3000 psi. At—1 bbls away OA reach about 1930 psi when psi started dropping rapidly. SD took a careful look at well, flutes and cellar. Pumped 2 more bbls of DSL down OA reaching a rate of.5 bpm while OA pressure kept falling off. SD. Notified PE. Bled OA to 40 psi. Got back—1.5 bbls. Bled Tbg and IA psi down got 6/6/2015 back—3 bbls. FWHP's=400/50/40 SV,WV,SSV=C MV=O IA,OA=OTG. 1/1/0=68/77/168 Temp=SI. [Obj: Pre Rig]. CMIT TxIA to 2500 psi ***PASSED***. Pumped 2.75 bbls diesel down TBG to reach test pressure. In 1st 15 min. TBG lost 98 psi/IA lost 96 psi. In 2nd 15 min. TBG lost 49 psi/IA lost 48 psi for ttl losses of 147 psi on tbg and 144 psi on IA. Bled back 2.33 bbls diesel. Hung caution tags and AFE sign. SwV, WV, SSV=closed, MV=Open, 6/7/2015 AL=closed, IA/OA=OTG. FWHP=308/324/179. T/I/O= SI/130/220. Start Barriers List= SSVx SV. Set TWC#146. Tagged @125". Installed temp. 6/12/2015 IA valve#74. RDMO. Final T/I/O=TWC/130/220. T/I/O=TWC/200/220. Pre Parker 272, Installed temp#83 as dryhole valve, Temp#11 as OA 6/13/2015 piggyback. Final T/I/O=TWC/200/220. T/I/0 =TWC/220/180. Temp = SI. Bleed IA& OAP to 0 psi (Pre Rig). No scaffolding, flowline, wellhouse or AL. Dryhole tree and two way check installed. Bled the IAP from 220 psi to 0 psi in 30 minutes (all fluid, slop tank, 16 gallons). During the IA bleed OAP decreased 40 psi. Bled the OA from 140 psi to 7 psi in 1 hour(9 gallons, fluid &gas). Monitored WHP's for 30 minutes, IAP remained unchanged and the OAP increased 3 psi. FWP's= TWC/0/10. SV= ?. MV= 0. IA, OA= 6/30/2015 OTG. 1450 hrs. North America-ALASKA-BP Page 1 0ffi8 Operation Summary Report Common Wet Name:S-44 AFE No Event Type:RE-ENTER-ONSHORE(RON) Start Date:7/9/2015 End Date: X3-016P4-C:(7,869,557.00) Project Prudhoe Bay Site:PB S Pad Rig Name/No.:PARKER 273 Spud DateTme:3/2/1997 12:00:00AM Rig Release: Rig Contractor.PARKER DRILLING CO. UWI:500292273500 Active datum:S-44A actual @81.43usft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (usft) 7/9/2015 06:00 - 07:00 1.00 MOB P PRE PJSM LAY OVER DERRICK 390 K ON RACK 07:00 - 09:00 2.00 MOB P PRE PJSM DISCONNECT FROM HIGH LINE POWER FROM UM,SEPARATE UM FROM DM AND STAGE ON THE SIDE OF PAD 09:00 - 12:00 3.00 MOB P PRE PREP TO MOVE DM OFF OF S-42A MOVE DM OFF WELL,REMOVE RIG MATS IN PREPARATION FOR PAD PREP. SIMOPS • -PJSM WITH PEAK CRANE CREW,PARKER AND BP,REMOVE SHAKER#1 FROM MM AND SET ON THE GROUND WITH CRANE. 12:00 - 14:30 2.50 MOB I P PRE PJSM MOVE MODULES AWAY FOR PAD PREP MOVE UM DOWN PAD MOVE DM AHEAD OF WELL START PAD PREP WITH GRADER SIMOPS REMOVE SHAKER BED#3 OUT OF SHAKER ROOM REMOVE AND INSTALL NEW CHAIN ON MUD PALLET LIFT. 14 30 - 16:00 1.50 MOB P PRE PJSM MOVE DUMMY WELL HOUSE PULL WELL HOUSE OFF OF S-42A --SPOT WELL HOUSE OVER S-44 -CLEAN CELLAR BOX AREA ON S-42A 16:00 - 20:30 4.50 MOB P PRE PAD PREP -GRADER LEVELED PAD FOR RIG SIMOPS -RAISE ADAPTER FLANGE AND TREE INTO BOP DECK -WORK ON REPLACING SHAKER BEDS 20:30 - 00:00 3.50 MOB P PRE LAY MATS FOR SPOTTING RIG OVER WELL • S-42A -WORK ON SHAKER BED REPLACEMENTS -SHAKERS#1 AND#3 ARE IN PLACE -INSTALL HARDWARE WITH PROPER OEM TORQUE SPECS WORK ON PALLET ELEVATOR CHAIN 7/10/2015 00:00 - 01:30 1.50 MOB P PRE FINISH SETTING MATS IN PLACE FOR SPOTTING RIG. 01:30 - 03:00 1.50 MOB N RREP -2.02 PRE CHANGE OUT SHAKER BDS 03:00 - 07:00 4.00 RIGU P PRE SPOT RIG OVER WELL -SPOT DRILL MOD OVER WELL,CHECK PLUM BOB AND LEVEL DM. -SPOT UTILITY MOD BY DM LEVEL UM -SPOT MUD MOD BY DM LEVEL MM • -ELECTRICIAN COMMENCED CONNECTING INTERCONNECTS 07 00 - 08:00 1.00 RIGU P PRE RAISE DERRICK -PJSM COMPLETE DERRICK WALK THROUGH -RAISE DERRICK 500K OFF HEAD ACHE RACK 08:00 - 09:30 1.50 RIGU P PRE RIG UP INTER CONNECTS -COMPLETE RIGGING UP INTER CONNECTS -CHANGE OUT UPPER RAMS F/2 7/8"X 5 1/2" TO 7"FIXED RAMS Printed 7/27/2015 11:19:23AM • North America-ALASKA-BP Page 22.oft$8 Operation Summary Report Common Well Name:S-44 AFE No Event Type:RE-ENTER-ONSHORE(RON) Start Date:7/9/2015 End Date X3-016P4-C:(7,869,557.00) Project Prudhoe Bay Site:PB S Pad Rig Name/No.:PARKER 273 Spud Date/Time:3/2/1997 12:00:00AM Rig Release: Rig Contractor.PARKER DRILLING CO. UWI:500292273500 Active datum:S-44A actual @81.43usft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (usft) 09:30 - 12:00 2.50 RIGU P PRE SKID FLOOR -PJSM SKID RIG FLOOR TO WELL CENTER -RAISE PIPE CAT INTO POSITION -SKID CATTLE CHUTE TO RIG FLOOR 12:00 - 15:00 3.00 RIGU P PRE BRIDLE DOWN ,-UNPIN BRIDLE LINES FROM BLOCKS AND SET ON RIG FLOOR RAISE BRIDLE LINES TO HANG IN HANGERS INSTALL SECONDARY RETENSION CABLES • -LOWER BLOCKS,CONNECT TO TOP DRIVE -CONNECT RIG FLOOR MUD LINES,CEMENT LINE SIMOPS -CONTINUE TO REPLACE CHAIN ON PALLET LIFT 15:00 - 16:00 1.00 RIGU P PRE CONNECT FLUID LINES IN INTERCONNECTS ,-CONNECT MUD LINES,AIR LINES RIG ACCEPTED @ 16:00 HRS 7/10/2015 16:00 - 18:00 2.00 RIGU P PRE RIG UP TO TEST TWC ,-RIG SECONDARY KILL LINE — — -- — T -RIG UP BLEED LINE TO IA 18:00 - 22:30 4.50 RIGU P PRE TEST TWC TEST TWC FROM BELOW(TEST FAILED .DUE TO BAD SENSATOR) REPLACE FAILED SENSATOR -TEST TWC FROM BELOW 250 PSI F/5 MIN (GOOD TEST) -TEST TWC FROM BELOW TO 3500 PSI F/5 MIN(GOOD TEST) SWITCH TO TEST PUMP -TEST TWC FROM ABOVE 250 PSI F/5 MIN GOOD TEST) HIGH TEST FAILED DUE TO BAD VALVES ON • TEST PUMP REPLACE VALVE -TEST TWC FROM ABOVE 3500 PSI F/5 MIN • (GOOD TEST) 22:30 - 23:00 0.50 RIGU P PRE VOID TEST LINES OF FLUIDS -BLOW DOWN SECONDARY KILL LINE AND BLED LINE TO TANK 23 00 - 00:00 1.00 RIGU P PRE NIPPLE DOWN TREE -FMC CHECKED ADAPTER FLANGE FOR PRESSURE 0 PSI -NIPPLE DOWN TREE AND ADAPTER FLANGE AS PER FMC -RAISE TREE AND ADAPTER FLANGE TO 80P DECK AND SECURE -FMC VERIFIED 7 1/2 TURNS TO MAKE UP TC-11 XO TO HANGER -NO VISUAL DAMAGE ON HANGER THREAD -LOWER AND INSTALL DSA ON TUBING SPOOL,TORQUE AS PER SPEC'S 7/11/2015 00.00 - 06 00 6.00 BOPSUR P PRE PJSM NIPPLE UP BOPE -PICK UP RISER WITH BLOCKS TO LOWER ONTO WELL HEAD -INSTALL BOLTS IN RISER -PICK UP BOP STACK AND SET ON RISER -TORQUE ALL BOLTS TO RECOMMENDED SPEC'S SIMOPS -CALIBRATE TOTCO SENSORS Printed 7127/2015 11 19 23AM Page North America-ALASKA-BP Pa s ara Operation Summary Report Common Well Name:S-44 AFE No Event Type:RE-ENTER-ONSHORE(RON) Start Date:7/9/2015 End Date X3-016P4-C:(7,869,557.00) Project Prudhoe Bay Site:PB S Pad Rig Name/No.:PARKER 273 Spud Date/Time:3/2/1997 12:00:00AM Rig Release: Rig Contractor:PARKER DRILLING CO. UWI:500292273500 Active datum:S-44A actual @81.43usft(above Mean Sea Level) Date . From-To Hrs Task Code ' NPT NPT Depth Phase Description of Operations (hr) — — (usft) 06:00 - 08:30 2.50 BOPSUR P DECOMP PJSM PREPARE TO TEST BOPE -FILL LINES,STACK AND GAS BUSTER WITH WATER 12.5 BBLS TO FILL GAS BUSTER -PERFORM SHELL TEST 250 PSI LOW,3500 • PSI HIGH. 08:30 - 16:00 7.50 BOPSUR P DECOMP -TEST BOPE TO 250 PSI LOW,3500 PSI HIGH FOR 5 MINUTES EACH • TEST WITH 4",4.5"AND T'TEST JOINTS • TEST CHOKE MANIFOLD,2 SETS PIPE RAMS,BLIND RAMS,ANNULS ELEMENT,HCR VALVES AND MANUAL VALVES ON STACK FLOOR VALVES,LOWER AND UPPER IBOP ON TOP DRIVE -ALL TESTS CHARTED -TEST WITNESSED BY AO'GCC REP MATT HERRERA 16:00 - 20:00 4.00 BOPSUR P DECOMP RIG UP DUTCH RISER/LUBRICATOR PRESSURE TEST LUBRICATOR 250 PSI LOW FOR 5 MIN - PRESSURE-TEST LUBRICATOR 3500 PSI HIGH FOR 5 MIN(GOOD TESTS) PULL TWC -RIG DOWN LUBRICATOR RIG DOWN DUTCH RISER 20:00 - 20:30 0.50 BOPSUR P DECOMP CIRCULATE OUT FREEZE PROTECT -PUMP DOWN TUBING 138 BBLS OF 9.3 • BRINE,TAKING RETURNS TO TIGER TANK -110 BLLS OF DIESEL RETURNED TO TIGER TANK • -CIRCULATE @ 340 GPM ICP=900 PSI FCP= 1150 PSI 20:30 - 21:00 0.50 BOPSUR P DECOMP RIG EVACUATION DRILL ALL PERSONNEL ACCOUNT FOR AT •BRIEFING AREA 4 MINUTES RESPONSE TIME DISCUSSED DRILU MR 21:00 - 22:00 1.00 BOPSUR P DECOMP MAKE UP JOINT AND CROSSOVER TO HANGER -M/U TO TUBING HANGER 7.5 TURNS • -BACK OUT LOCK DOWNS AS PER FMC CORRECT MEASUREMENTS OUT ON LOCK DOWNS -PULL HANGER UP 4'HANGER COME FREE OFF SEAT AT 62K 32K STRING WT 22:00 - 22:30 0.50 BOPSUR P DECOMP CIRCULATE WELLBORE -MONITOR WELL FOR 10 MINUTES(WELL STATIC) CIRCULATE BU 1 TIME,NO DIESEL RETURNS @ 340 GPM 290 PSI 22:30 - 00:00 1.50 BOPSUR P DECOMP PULL HANGER TO FLOOR • -BREAK OUT HANGER -LAY DOWN DRILL PIPE AND HANGER MONITOR WELL FOR 10 MIN(STATIC) -POH ON ELEVATORS LAYING DOWN TUBING F/3220 MD TO 2700'MD -BRINE WT 9.3 PPG -PU 56K,SO 56K AT 2900' Printed 7/27/2015 11:19:23AM • North America-ALASKA-BP Page 4 of( ,. Operation Summary Report Common Well Name:S-44 AFE No Event Type:RE-ENTER-ONSHORE(RON) Start Date:7/9/2015 End Date: X3-016P4-C:(7,869,557.00) Project:Prudhoe Bay Site:PB S Pad Rig Name/No.:PARKER 273 Spud DateTme:3/2/1997 12:00:00AM Rig Release: Rig Contractor:PARKER DRILLING CO. UWI:500292273500 Active datum:S-44A actual @81.43usft(above Mean Sea Level) Date From-To Firs Task Code NPT NPT Depth Phase Description of Operations (hr) (usft) 7/12/2015 00:00 - 02:30 2.50 CASING P DECOMP POH ON ELEVATORS POH F/2700'TO SURFACE MONITOR WELL VIA TRIP TANK(GOOD DISPLACEMENT) -LENGTH OF CUT JOINT=3.39'WITH A 4.75" FLARE FROM THE JET CUT 02:30 - 03:00 0.50 CASING P DECOMP PJSM INSTALLING WEAR RING !-INSTALL WEAR RING RIG DOWN DOYON CASING EQUIPMENT AND CLEAR FLOOR LOAD FLOOR WITH BAKER MULTI STRING 'CUTTER 03:00 - 07:30 4.50 CASING P DECOMP PJSM PICKING UP BHA -MAKE BI-1A#1 AS PER BAKER REP -PICK UP 4"DRILL PIPE SINGLE FROM PIPE SHED MONITOR WELL VIA TRIP TANK SIMOPS MOVE LINE FROM IA TO OA,OPEN OA TO TIGER TANK 07 30 - 08 30 1.00 CASING P DECOMP LOCATE COLLARS -MAKE UP TOP DRIVE,BREAK CIRCULATION -LOCATE CASING COLLARS AS PER BAKER ,REP POSITION CUTTER AT 2910'MD -CUT 7"CASING @ 2910'MD -P/U=70K,SO=70K,ROT=68K -340 GPM @1500 PSI -90 RPM WITH 2-3K TORQUE 08:30 - 09'30 1.00 CASING P DECOMP PJSM DISPLACE DEAD CRUDE FROM OA -SHUT IN ANNULAR PREVENTOR -PUMP DOWN KILL LINE AND DPTAKING RETURNS UP THE OA TO FLOW BACK TANK -PUMP 25 BBLS HIGH VIS SPACER -PUMP 100 BBLS 9.3 PPG BRINE -40 BBLS DEEP CLEAN PILL -100 BBLS OF 9.3 PPG BRINE _ -168 GPM @ 250 PSI 09:30 - 11:00 1.50 i CASING P DECOMP P01-I -MONITOR WELL FOR 10 MIN(STATIC) -POH ON ELEVATORS F/2941 T/SURFACE BHA #1 -LAY DOWN CUTTER ALL BLADES INTACT SIGNS OF WEAR ON BLADES. -MONITOR WELL VIA TRIP TANK(CORRECT DISPLACEMENT) 11:00 - 12:00 1.00 CASING P DECOMP PULL WEAR RING AND PACK-OFF MAKE UP WEAR RING PULLER PULL WEAR RING -MAKE UP PACK-OFF PULLING TOOL -J INTO PACK-OFF AS PER FMC -BACK OUT LOCK DOWN SCREWS -PULL PACK-OFF TO FLOOR -LAY DOWN PACK OFF 12:00 - 14:00 2.00 CASING P r DECOMP PJSM SPEARING 7"CASING -MAKE UP SPEAR TO 4"DP PER BAKER REP -RUN SPEAR INTO 7"CASING -PULL 10K OVER TO ENGAGE SPEAR -PULL 7"HANGER TO RIG FLOOR -P/U=92K =62K STRING WT Printed 7/27/2015 11:19:23AM North America-ALASKA-BP Page s°w Operation Summary Report Common Well Name:S-44 AFE No Event Type:RE-ENTER-ONSHORE(RON) Start Date:7/9/2015 End Date. X3-016P4-C:(7,869,557.00) Project:Prudhoe Bay Site:PB S Pad Rig Name/No.:PARKER 273 Spud Date/Time:3/2/1997 12:00:00AM Rig Release Rig Contractor:PARKER DRILLING CO. UWI:500292273500 Active datum:S-44A actual©81.43usft(above Mean Sea Level) Date From-To Hrs Task Code NPT ' NPT Depth Phase Description of Operations (hr) (usft) 14:00 - 14:30 0.50 CASING r P DECOMP PJSM RIG UP CASING EQUIPMENT -BREAK OUT AND LAY DOWN SPEAR -LAY DOWN 7"FLUTED HANGER -M/U XO 7"TO XT-39 14:30 - 15:00 0.50 CASING P DECOMP [CIRCULATE ,-CIRCULATE B/U 1 TIME -340 GPM @ 145 PSI MONITOR WELL FOR 10 MIN(STATIC) 15:00 - 19:00 4.00 CASING P DECOMP LAY DOWN 7"CASING POH F/2910 TO SURFACE LAYING DOWN 7" CASING P/U 50K SO 50K @ 1500' CUT JOINT=30.68' -70 JOINTS LAID DOWN 19:00 - 20:00 1.00 CASING P DECOMP CLEAR AND CLEAN FLOOR RIG DOWN DOYON CASING EQUIPMENT 20:00 - 20:30 0.50 CASING P DECOMP FIRE DRILL WITH ESCALATION INTO A RIG EVACUATION -CRT=6 MINUTES -DRILL FACILITATED BY BP AND PARKER FIELD SUPERINTENDENTS -AAR HELD WITH ALL PERSONNEL INVOLVED TO DISCUSS LESSONS LEARNED 20:30 - 21:00 0.50 CASING P DECOMP -M/U DP TO WEAR BUSHING TOOL SET WEAR BUSHING RUN IN 4 LOCK DOWN SCREWS 21 00 - 23:30 2.50 CASING P I DECOMP PJSM PICKING UP BHA -MU CLEAN OUT BI-IAAS PER BHA RUNNING • ORDER AND BAKER REP. —_ — F/SURFACE T/878'MD — —23:30 - 00:00 0.50 CASING P DECOMP RIG SERVICE -GREASE WASH PIPE,BLOCKS,TOP DRIVE _ ROLLER ASSEMBLY/CROWN CLUSTER 7/13/2015 00:00 - 02:30 • 2.50 Y CLEAN P DECOMP •PJSM PICK UP DRILL PIPE -RIHWITH4"DPF/878'MDTO2911'MD -P/U=106K,S/O=106K @ 2900'MD • -TAG CASING STUB @ 2908'MD DP MEASUREMENT -MONITOR WELL VIA TRIP TANK(CORRECT -- — - DISPLACEMENT) 02:30 - 03:00 0.50 CLEAN P DECOMP CIRCULATE BOTTOMS UP -CBU 1.5 X,@ 500 GPM,1135 PSI -OBTAIN SPR MP#1=20 SPM=85 PSI,40 SPM=135 PSI,#2 30 SPM=90 PSI,40 SPM= 135 PSI -2910'MD MW 9.3 BRINE 0300 - 04:00 1.00 CLEAN P DECOMP PULL OUT OF HOLE -MONITOR WELL FOR 10 MIN(STATIC) -POH F/2910'MD T/878/MD -MONITOR WELL VIA TRIP TANK(CORRECT DISPLACEMENT) 04'00 - 06:00 2.00 CLEAN P DECOMP PJSM STAND BACK BHA -STAND BACK 5"HWT DRILL PIPE IN DERRICK STAND BACK 6"COLLARS IN DERRICK LAY DOWN CLEAN OUT BHA#3 Printed 7/27/2015 11 19'23AM • • North America-ALASKA-BP Page 6 af213 Operation Summary Report Common Well Name:S-44 AFE No Event Type:RE-ENTER-ONSHORE(RON) Start Date:7/9/2015 End Date: X3-016P4-C:(7,869,557.00) Project:Prudhoe Bay Site:PB S Pad Rig Name/No.:PARKER 273 Spud Date/Time:3/2/1997 12:00:00AM Rig Release: Rig Contractor.PARKER DRILLING CO. UWI:500292273500 Active datum:S-44A actual©81.43usft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (usft) 06:00 - 10:30 4.50 CLEAN P DECOMP PJSM RIG UP WIRELINE -RIG UP HALLIBURTON WIRELINE -MAKE UP EZSV TO WIRELINE -RUN IN HOLE LOGGING COLLARS 1-POSITION EZSV @ 2766'E LINE MD -SET EZSV -POH WITH WIRELINE -RIG DOWN WIRELINE EQUIPMENT CLEAR FLOOR 10:30 - 11:30 1.00 CLEAN P DECOMP PRESSURE TEST EZSV AND 9 5/8"CASING -TEST LOW TO 250 PSI 5 MIN TEST HIGH TO 3000 PSI FOR 30 MIN -GOOD TESTS 11:30 - 12:30 1.00 CLEAN P DECOMP PJSM CHANGE RAMS -VOID STACK OF LIQUIDS -CLOSE BLIND RAMS -CHANGE OUT TOP RAMS F/7"FIXED RAMS T/2 7/8"X 5 1/2"VARIABLES -OPEN BLINDS PULL WEAR BUSHING — — - ! SET TEST PLUG_ 12:30 - 13:30 1.00 CLEAN P DECOMP PJSM TEST VARIABLE RAMS -RIG UP 4"TEST JOINT -TEST VARIABLE RAMS T/250 PSI LOW,3500 PSI HIGH 5 MIN EACH -PULL TEST PLUG -INSTALL WEAR BUSHING LAY DOWN TEST JOINT 14:00 + — — BLOW DOWN CHOKE AND KILL LINES 13:30 0.50 � CLEAN P DECOMP SERVICE RIG -GREASE ST-80,BLOCKS,ELEVATORS,TOP DRIVE,CHECK TD OIL 14.00 - 17:00 3.00 STWHIP ! P WEXIT PJSM P/U AND RUN WHIPSTOCK -MAKE UP WHIP STOCK BHA AS PER BAKER REP T/925' -BRING GYRO TOOLS TO RIG FLOOR 17:00 - 18:30 1.50' STWHIP P WEXIT :RUN WHIP STOCK -RIH F/925'MD T/2743'MD -P/U=101 K,S/O=105K @ 2743'MD 18:30 - 20:00 1.50 STWHIP P WEXIT PJSM ORIENTATE AND SET WHIP STOCK -R/U AND RUN GYRO ON E-LINE -ORIENTATE TO MAGNETIC AZ 281 DEGREES -P/U 102K S/O 106K -TAG EZSV @ 2764 - SET ANCHOR WITH 14KS/O - P/U 10K OVER TO CHECK SET -S/O SHEAR BOLT @ 41K -PICK UP 3 FOOT TO DISPLACE TO MILLING FLUID 20:00 - 21.00 1.00 STWHIP P WEXIT DISPLACE 9.3 PPG BRINE -PUMP 20 BBL SPACER -PUMP 230 BBLS 9.3 MILLING FLUID BEHIND SPACER -TRACK BBL IN AND BBL OUT OBTAIN SPR MP#1=30 SPM=131 PSI,40 SPM=165 PSI MP#2=30 SPM=132,40 SPM=167 PSI Printed 7/27/2015 11:19:23AM North America-ALASKA-BP Page 7 418 Operation Summary Report Common Wet Name:S-44 AFE No Event Type:RE-ENTER-ONSHORE(RON) Start Date:7/9/2015 End Date: X3-016P4-C:(7,869,557.00) Project:Prudhoe Bay Site:PB S Pad Rig Name/No.:PARKER 273 Spud Date/Time:3/2/1997 12:00:00AM Rig Release: Rig Contractor PARKER DRILLING CO. UWI:500292273500 Active datum:S-44A actual t 81.43usft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (usft) 21:00 - 00:00 3.00 STWHIP P WEXIT MILL WINDOW _ - j -MILL WINDOW F/2743'TO 2750' f/�/Vt -500 GPM 760 PSI -100 RPM,TORQUE 5 TO 6K s-4/44 J -P/U 102K,S/O 106K,ROT 103K SIMOPS -BUILDING STANDS WITH OFF LINE STAND BUILDING SYSTEM 7/14/2015 00:00 - 06:00 6.00 STWHIP P WEXIT MILL 8 1/2"WINDOW -MILL WINDOW F/2750'TO 2760' -DRILL 21'OF 8-1/2'OPEN HOLE TO 2,781'MD '-500 GPM 760 PSI • -100 RPM,TORQUE 5 TO 6K -P/U=102K,S/O=106K,ROT=103K BACKREAM THROUGH WINDOW AND THEN !WORK MILLS THRU WINDOW MULTIPLE TIMES WITH NO PUMPS OR ROTATION TO ENSURE SMOOTH WINDOW -NO DRAG THRU WINDOW TOP OF WINDOW:2,743'MD BOTTOM OF WINDOW 2,760'MD • SIMOPS BUILDING STANDS WITH OFFLINE 06:00 - 07:00 1.00 I STWHIP P WEXIT CIRCULATE BOTTOMS UP • -PUMP 30 BBL HIGH VIS SUPER SWEEP -500 GPM,915 PSI • METAL SHAVINGS IN RETURNS MUD WEIGHT:9.3 PPG IN,9.3 PPG OUT MONITOR WELL FOR 10 MIN:WELL STATIC 07:00 - 08:00 1.00 'I STWHIP P WEXIT PERFORM LEAK-OFF TEST • -MUD WEIGHT:9.3 PPG,2,760'TVD PUMP 2.1 BBLS AT 0.75 BPM,PRESSURE • BROKE OVER AT 1060 PSI,BLEED BACK 2 • BBLS • -ACHIEVE 16.69 PPG FIT, -DISCUSS RESULTS WITH ODE -BLOW DOWN TEST EQUIPMENT -SEE ATTACHED DOCUMENTATION 08:00 - 08:30 0.50 STWHIP P WEXIT POOH ON ELEVATORS WITH MILLING ASSEMBLY FROM 2,760'MD TO 900'MD -MONITOR WELL FOR 10 MINS PRIOR TO POOH WITH MILLING ASSEMBLY:WELL STATIC -P/U=104K,S/O=101K AT 2,730'MD MUD WEIGHT:9.3 PPG IN,9.3 PPG OUT -MONITOR WELL VIA TRIP TANK PROPER DISPLACEMENT 08-30 - 12:00 3.50 STWHIP P WEXIT L/D MILLING BHA FROM 900'MD TO SURFACE -MONITOR WELL FOR 10 MINUTES BEFORE •PULLING NON SHEARABLES ACROSS STACK WELL STATIC L/D 6"DRILL COLLARS -STAND BACK 5"HWDP • WINDOW MILL 1"UNDERGAUGE MIDDLE MILL 15/16"UNDERGAUGE -UPPER WATERMELON MILL 7/16" •UNDERGAUGE DISCUSS PLAN FORWARD WITH ODE Printed 7/27/2015 11:19:23AM • • North America-ALASKA-BP Page 8 c>i22.8 Operation Summary Report Common Well Name:S-44 AFE No Event Type:RE-ENTER-ONSHORE(RON) Start Date:7/9/2015 End Date: X3-016P4-C:(7,869,557.00) Project:Prudhoe Bay Site:PB S Pad Rig Name/No.:PARKER 273 Spud Date/Time:3/2/1997 12:00:OOAM Rig Release: Rig Contractor.PARKER DRILLING CO. UWI:500292273500 Active datum:S-44A actual©81.43usft(above Mean Sea Level) Date From-To Hrs Task ' Code NPT NPT Depth Phase Description of Operations (hr) (usft) 12:00 - 14:00 2.00 STWHIP N DPRB 2,760.98 WEXIT PICKUP SECOND WINDOW MILLING ASSEMBLY • CLEAN AND CLEAR RIG FLOOR -SEND OUT OLD BHA AND BRING NEW ONTO RIG FLOOR -INSPECT AND GAUGE SAVER SUB 14:00 - 14:30 0.50 STWHIP P WEXIT METHANE GAS AT SHAKER DRILL AND AAR • -VISIBLE ALARM CAUGHT CREWS ATTENTION DRILLER CHECKED FOR FLOW AND WAS INFORMED OF DRILL -DRILLER SIMULATED SHUTTING IN WELL !AND MADE PROPER ANNOUNCMENT 1430 - 16:00 1-50 STWHIP N DPRB 2,760.98 WEXIT I MAKE UP BAKER MILLING ASSEMBLY FROM SURFACE TO 706'MD '-MAKEUP STRING MILL AND WINDOW MILL ASSEMBLY -BKR REP AND SLB DD GAUGE MILLS ALL MILLS IN GAUGE • ,-8.5"WINDOW MILL,LOWER WATERMELON MILL,FLEX JOINT,UPPER WATERMELON MILL,FLOAT SUB,1 JT 5"HWDP,(3)NM FLEX COLLAR,(18)JTS 5"HWDP,XO 16:00 - 17:30 1.50 STWHIP N ,, DPRB 2,760.98 WEXIT RIH ON ELEVATORS WITH 8.5"MILLING ASSEMBLY FROM 706'MD TO 2,743'MD -RIH WITH 4"DP FROM DERRICK •-BREAK CIRCULATION EVERY 20 STANDS, 500 GPM,900 PSI -MUD WEIGHT:9.3 PPG IN,9.3 PPG OUT -MONITOR WELL VIA TRIP TANK PROPER • .__. DISPLACEMENT 17:30 - 20:30 3.00 STWHIP N DPRB ' 2,760.98 WEXIT DRESS WINDOW WITH 8.5"MILLING ASSEMBLY •-100 RPM,3-4K TORQUE -500 GPM,820 PSI P/U=89K,S/O=92K,ROT=90K -WORKED THRU WINDOW WITH PUMPS ON &ROTATION AND PUMPS OFF&NO ROTATION NO DRAG THRU WINDOW PUMPED HIGH VIS SUPER SWEEP,15% INCREASE IN CUTTINGS SEEN -OBTAINS SPRS 20:30 - 21:30 1.00 , STWHIP N DPRB 2,760.98 WEXIT POOH WITH 8.5"MILLING ASSEMBLY FROM 2,781'MD TO 700'MD -MONITOR WELL FOR 10 MINUTES:WELL STATIC -MUD WEIGHT:9.3 PPG IN,9.3 PPG OUT -P/U=73K,S/O=73K AT 1,650'MD -MONITOR WELL VIA TRIP TANK PROPER DISPLACEMENT Printed 7/27/2015 11:19:23AM ' North America-ALASKA-BP Page 9 4 Operation Summary Report_; Common Well Name:S-44 AFE No Event Type:RE-ENTER-ONSHORE(RON) Start Date:7/9/2015 End Date: X3-016P4-C:(7,869,557.00) Project:Prudhoe Bay Site:PB S Pad Rig Name/No.:PARKER 273 Spud Date/Time:3/2/1997 12:00:00AM Rig Release: Rig Contractor:PARKER DRILLING CO. UWI:500292273500 Active datum:S-44A actual( 81.43usft(above Mean Sea Level) ' Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) — — (u ) 21:30 - 22:30 1.00 STWHIP N DPRB 2,760.98 WEXIT UD MILLING ASSEMBLY FROM 700'MD TO SURFACE • -MONITOR WELL FOR 10 MINUTES BEFORE PULLING NON SHEARABLES ACROSS THE STACK:WELL STATIC -STAND BACK 5"HWDP WINDOW MILL 7/8"UNDERGAUGE ' LOWER WATERMELON MILL 7/8" UNDERGAUGE i -UPPER WATERMELON MILL 9/16" UNDERGAUGE • -DISCUSS WITH ODE&BP i SUPERINTENDANT PLAN FORWARD -DECISION TO SET ANEW EZSV, WHIPSTOCK,AND MILL A SECOND WINDOW 122:30 - 23:00 • 0.50 ' STWHIP P WEXIT RIG SERVICE -GREASE TOP DRIVE,ST-80,CROWN, ' I 'BLOCKS,CHECK TOP DRIVE OIL 23:00 - 00:00 1.00 ' STWHIP ' N : DPRB 2,760.98 . WEXIT FLUSH STACKAND FUNCTION BOPS -PULL 9-1/8'r WEAR RING -FLUSH BOP WITH BOP WASHING TOOL -FUNCTION RAMS I -BLOW DOWN CHOKE AND KILL LINES ' ' -DRAIN STACK 7/15/2015 00:00 - 00:30 0.50 ' STWHIP N DPRB 2,760.98 ' WEXIT INSTALL 9-1/8"WEAR RING -CLEAN AND CLEAR RIG FLOOR 00:30 - 04:00 • 3.50 ! STWHIP _N DPRB 2,760,98 WEXIT WAIT ON E-LINE TO ARRIVE TO SET EZSV I **SIMOPS** -PERFORM DERRICK INSPECTION -OPEN HANDLER DOOR AND INSPECT • SAVER SUB i BUILD STANDS OFFLINE -CHANGE OUT SRL AT CROWN CHANGE LIGHTS IN DERRICK LOAD 6-1/2"COLLARS INTO PIPESHED 04:00 - 08:30 4.50 , STWHIP ' N DPRB 2,760.98 i WEXIT RIG UP HALLIBURTON E-LINE -MAKE UP EZSV TO E-LINE -RUN IN HOLE WITH EZSV/CCL -POSITION EZSV C©1 2,682'E LINE MD ' -SET EZSV -POOH WITH WIRELINE -RIG DOWN WIRELINE EQUIPMENT -CLEAN AND CLEAR FLOOR 08:30 - 09:00 0.50 STWHIP N DPRB 2,760.98 WEXIT PRESSURE TEST EZSV TO 250 PSI LOW FOR 5 MIN,3000 PSI HIGH FOR 5 MIN EACH -GOOD 250 PSI LOW TEST -GOOD 3000 PSI HIGH TEST -TEST CHARTED AND ATTACHED 09:00 - 12:00 3.00 STWHIP N DPRB 2,760.98 WEXIT MAKE UP BAKER WHIPSTOCK ASSEMBLY FROM SURFACE TO 926'MD -MAKEUP 9-5/8"GEN II 3-STRING MILL AND LEAD MILLASSEMBLY -CONFIRM ANCHOR SET FOR 20 KLBS SHEAR AND REMOVAL OF SHIPPING PIN -BKR REP AND SLB DD ON RIG FLOOR -ORIENT UBHO WITH WHIPSTOCK HIGHSIDE AND CONFIRM GYRO DATA TOOL PROPERLY ORIENTED -RIH 9 X 6 1/2"DRILL COLLARS -RIH WITH 18 JTS 5"HWDP Printed 7/27/2015 11:19:23AM • North America-ALASKA-BP Page 10 oftj.5 Operation Summary Report Common Well Name:S-44 AFE No Event Type:RE-ENTER-ONSHORE(RON) Start Date:7/9/2015 End Date: X3-016P4-C:(7,869,557.00) Project:Prudhoe Bay Site:PB S Pad Rig Name/No.:PARKER 273 Spud Date/Time:3/2/1997 12:00:00AM Rig Release: Rig Contractor:PARKER DRILLING CO. UVVI:500292273500 Active datum:S-44A actual©81.43usft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (usft) 12:00 - 13:30 1.50 STWHIP N DPRB 2,760.98 WEXIT RIH WITH WHIPSTOCK/MILLING BHA#5 FROM 926'MD TO 2,654'MD -RIH WITH 4"DP FROM DERRICK -FILL PIPE EVERY 20 STANDS,500 GPM,700 •PSI -MONITOR WELL VIA TRIP TANK:PROPER DISPLACEMENT **SIMOPS** -SPOT&RIG UP SPERRY E-LINE FOR GYRO H__TO ORIENT WHIPSTOCK 13 30 - 14:30 1.00 STWHIP N DPRB 2,760.98 WEXIT RIH GYRODATA TO ORIENT WHIPSTOCK -R/U GYRODATA -RIH AND ORIENT WHIPSTOCK 283 DEG AZI AS PER SLB&GYRODATA •-TAG EZSV AT 2,682'MD P/U=100K,S/0=104K -POOH WITH GYRO AND R/D ELINE 14:30 - 15:30 1.00 STWHIP N DPRB 2,760.98 WEXIT SET WHIPSTOCK SLACKOFF 17K TO SET ANCHOR -PICKUP 10K OVER TO CONFIRM ANCHOR ,SET -SHEAR MILLING ASSMEBLY WITH SLACKING OFF 42K -P/U TO CONFIRM ASSEMBLY FREE,P/U= 97K -OBTAIN SPRS 15 30 - 22 30 7 00 STWHIP N DPRB 2,760.98 WEXIT KICKOFF S-44A SIDETRACK AND MILL WINDOW -MILL WINDOW IN 9-5/8"CASING WITH 8-1/7' MILLING ASSEMBLY FROM 2,661'MD TO 2,678' MD -DRILL 19'OF FORMATION TO 2,697'MD -575 GPM,915 PSI -90 RPM,3-5K TORQUE -WOB:3-4K -P/U=104K,5/0=100K,ROT=101K -CEMENT OBSERVED BEHIND CASING -METAL CUTTINGS TO SURFACE OBSERVED -PUMP 25 BBL HIGH VIS SWEEP AT 2,669'MD, 15%RETURN IN CUTTINGS -PUMP 25 BBL HIGH VIS SUPER SWEEP AT 2,694'MD,20%RETURN IN CUTTINGS -WORK MILLS THRU WINDOW MULTIPLE TIMES TO ENSURE SMOOTH WINDOW -NO DRAG -OBTAIN SPRS TOP OF WINDOW:2,661'MD,2,661'TVD MIDDLE OF WINDOW:2,670'MD,2,670TVD BOTTOM OF WINDOW.2,678'MD,2,678'ND 22:30 - 23:00 0.50 STWHIP N DPRB 2,760.98 WEXIT PERFORM FIT TEST -MUD WEIGHT:9.3 PPG,2,661'ND -PUMP 2 BBLS AT 0.75 BPM,PRESSURE BROKE OVER AT 910 PSI,BLEED BACK 1.8 BBLS -ACHIEVE 15.78 PPG FIT -DISCUSS RESULTS WITH ODE -BLOW DOWN TEST EQUIPMENT -SEE ATTACHED DOCUMENTATION Printed 7/2712015 11 19 23AM • North America-ALASKA-BP Page 11a Operation Summary Report Common Well Name.S-44 AFE No Event Type:RE-ENTER-ONSHORE(RON) Start Date:7/9/2015 End Date X3-016P4-C:(7,869,557.00) Project:Prudhoe Bay Site:PB S Pad Rig Name/No.:PARKER 273 Spud Date/me:3/2/1997 12:00:00AM Rig Release: Rig Contractor.PARKER DRILLING CO. UWI:500292273500 Active datum:S-44A actual t81.43usft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (usft) 23:00 - 23:30 0.50 STWHIP P 2,760.98 WEXIT RIG SERVICE GREASE WASHPIPE,BLOCKS,ROLLER ASSEMBLY,ST-80,CROWN CLUSTER 23:30 - 00:00 • 0.50 STWHIP N DPRB . 2,760.98 WEXIT POOH ON ELEVATORS WITH MILLING ASSEMBLY FROM 2,630'MD TO 1,600'MD -MONITOR WELL FOR 10 MINUTES:WELL STATIC -MUD WEIGHT:9.3 PPG IN,9.3 PPG OUT P/U=104K,S/O=100K AT 2,630'MD -MONITOR WELL VIA TRIP TANK PROPER DISPLACEMENT 7/16/2015 00:00 - 00:30 0.50 STWHIP N DPRB 2,760.98 WEXIT 'POOH ON ELEVATORS WITH MILLING ASSEMBLY FROM 1,600'MD TO 926'MD MUD WEIGHT:9.3 PPG IN,9.3 PPG OUT P/U=92K,S/0=92K AT 1,600'MD -MONITOR WELL VIA TRIP TANK:PROPER DISPLACEMENT 00:30 - 02:30 2.00 STWHIP N I DPRB 2,760.98 WEXIT LID MILLING BHA FROM 926'MD TO SURFACE -MONITOR WELL FOR 10 MINUTES BEFORE ,PULLING NON SHEARABLES ACROSS STACK WELL STATIC L/D 6"DRILL COLLARS STAND BACK 5"HWDP :-WINDOW MILL 3/8"UNDERGAUGE -MIDDLE MILL 1/4"UNDERGAUGE -LOWER WATERMELON MILL 1/16" • • UNDERGAUGE UPPER WATERMELON MILL 1/16" :UNDERGAUGE -CLEAN AND CLEAR RIG FLOOR 02:30 - 03:30 1.00 STWHIP P WEXIT FLUSH STACK AND FUNCTION BOPS PULL 10"WEAR RING -FLUSH BOP WITH BOP WASHING TOOL -FUNCTION BOPS -BLOW DOWN CHOKE AND KILL LINES • -DRAIN STACK INSTALL 10"WEAR RING 03:30 - 07:00 3.50 STWHIP P WEXIT MAKE UP 8.5"MOTOR DRILLING BHA FROM SURFACE TO 863'MD -M/U AS PER SLB DD/MWD,GYRODATA -P/U=70K,S/O=70K -8-1/2"PDC,6-3/4"PDM 1.5 DEG,8-3/8 NM STAB,NM X0.GYROPULSE 675 GWD, TELESCOPE 675 MWD,PERISCOPE 675 LWD,NM XO,8-3/8"NM STABILIZER,(3)FLEX COLLAR,FLOAT SUB,(15 JTS)5"HWDP, HYDRAULIC JARS,(5 JTS)5"HWDP,XO - ---_. -- 07:00 - 08:00 1.00 STWHIP P WEXIT RIH ON ELEVATORS WITH 8.5"MOTOR DRILLING ASSEMBLY FROM 863'MD TO TOW AT 2,661'MD -MUD WEIGHT:9.3 PPG IN,9.3 PPG OUT -SHALLOW HOLE TEST MWD AND GYRO TOOLS AT 1,800'MD,450 GPM,950 PSI,GOOD TEST -MONITOR WELL VIA TRIP TANK PROPER •DISPLACEMENT -ORIENT MOTOR TO EXIT WINDOW •-OBTAIN SPRS Printed 7/27/2015 11:19:23AM WELLHEAD= FMC S-44 SAFE;Y NOTES: ACTUATOR= Ll ELEV= 67' f BF.ELEV __. ,-_ _37.16' KOP- 4452 20"CONDUCTOR, ---1 110' Max Angle=.104*6.-, 10550' Datum MD= N/A91.5#,1-3-40. Datum ND= 8800'SS D=19.124" 9-5/8"WHIPSTOCK(07/15/15) H 2661' Mr H9 8"EZSV(07/15/15) 'y. 9-5/8"WHFSTOCK(07/1415) -$ 2743' 2764' H9-5/8"EZSV(07/13/15) 7'CSG STUB(07/12/15) -I 2910' GAS LFT MANDRELS 9-5/8"CSG,40#,L-80 BUTT,D=8.835' H 3130' ST MD ND DEV TYPE VLV ,ATt3-FORT DATE 5 3437 3437 0 KBG-2 DMY BK 0 10/29/14 4-1/2'TBG STUB(06/06/15) H 3220' !' 4 5685 5585 29 KBG-2 DMY BK 0 10/29/14 ESTIMATED TOP OF C R&Mr(06/04/15) -{ 7703' Vaii..! 3 7299 6981 31 KBG-2 OW BK 0 10/29/14 *2 8364 7900 31 KBG-2 DMY BK 0 10/29/14 Minimum ID =8.835" '1 9016 8465 32 KBG-2 EMPTY -- 06/03/15 Aile 9-5/8" CASING ' STA'S#1&#2CMENT C(06/04/15) 9084' ,-4-1/2"HES X NP,D=3.813" 4-1/2"FES CMT RETAINER(05/13/15) H 9159' 46. 9105' -__I T x 4-1/2"BKR S-3 PKR,D=3.875" 4-1/2"TBG,12.6#,13CR-80 VA TOP, - 9191' \ 9128' _H4-1/2"t ES X NMS,D=3.813" .0152 bpf,ID=3.958' 4-1/2'TBG STUB(JE V RY LOG 09/03/06) H 9195' -- 9225' -14-1/2"HES X NP,113=3.813" 4-1/2"TBG,12.6#,L-80 BM,.0152 bpf,0=3.958" - 9245' 9200' H7"X 4-1/2"UNDUE OVERSHOT s.ei• 9236. 7"x 4-1l2"BKR S-3 PKR D=3.875" --1111‘1100We►► Mt_LOUT WIVDOW(S-44L1)9506'-9518' 7'RA TAG -1 9298' FISH-48'OF TBG TA L @ Li WINDOW 9496' ► RD 9528' -j 5-5/8"TACK SLEEVE, =5.25" Ate(TAGGED 09/03106) ► g I 9532' --j 5"X 4-1/2"XO,D=3.958" 7"RA TAG 9505' �+� ��. 7+ , I FISH-28'BKR WHIPSTOCK(ON ML PKR) 9514' ► 0 � �lit*V.Alt's,' 7"X 4-1/2"BKR ML PKR D=3.875" 9542' Mi ►. 4-1/2"TBG,12.6#,L-80 NSCT,.0152 bpf,D=3.958' -I 9576' I 4-1/2"LNR12.6#,L-80 NSCT, H 12373' 1r� .0152bpf,D=3.958" 7"X 4-1/2'TNN S-6 PKR w/TEBK SLV,0=3.868" -{ 9939' V• 7"X 4-1/2"TAN DTH-S HYD LNR HGR,0=3.925' 9951' 9560' J ?D 4-1/2'HES X N =3.813" Ate 4 1.1 I 7"CSG,26#,L-80 BTGSTL,D=6.276" H 10204 9567* I-4-1/2"FES XN NP,D=3.725" PERFORATION SLID/MARY �� 1 9576' -14-1f2'WLEG,D=3.958" REF LOG: 3 We II 1 ANGLE AT TOP PERE WA r Note:Refer to Production DB for historical pert data • 10 7G -{4 1/2"FES C YT02 SIZE SFF INTERVAL Opn/Sgz SHOT SO2 10878' CTC EXT CSG PKR,0=3.885' • 4-1/2" SLOT*10927-13128 S 05/02/97 06/02115 r 13128' H PBS ni S?L4 Li 4-1/2" SLOT '9532-10306 S 05/02/97 06/02/15 :7 b%�Y 'w%%%,% 4-1/2" SLOT'10392 11502 S 05/02/97 06/02/15 ....tr .4 4-1/2" SLOT*11584-12350 S 05/02/97 06/02/15 4-1/2"SOLD SLID LNR -I 13130' •BELOWCENENT RETAINER @ 9159'(05/13/15) 126#,L-80 NSCT,.0152 bpf,D=3.958" DATE REV BY COMMENTS U'4TS DATE REV BY C 01 fVE{TS PRUD-OE BAY UNIT 05/03/97 NI8E ORIGINAL COMPLETION 06/06/15 CJS/PJC JET cur TIJBtVG WELL: S-44/L1 06/27/06 N785 IVO 06/16/15 11 PJC BASE FLANGE(2013)CORRECTION PERMIT No: 197006011970070 05/13/15 GTN/PJC CBVENT RETAINER 07/13/15 PJC CUT/RLL TBG&7"CSG RIG AR Na: 50-029-22735-00(60) 06/02/15 TA/PJC P&A 07/14/15 PJC SET 1ST FS7V& WHPSTOOC(RIG) SEC 35,T12N,R12E,1038'F't&778'FVVL 06/03/15 PJC GLV FULLED#1(EMPTY) 07/15/15 PJC SET 2ND EZSV&VVI-*'STOC K(RIG) 06/04/15 DUI PJC CMI CAP BP Exploration(Alaska) OF T7y�•(r: � 1�j,�sA THE STATE Alaska Oil and Gas s� , Of Conservation Commission _ =: _ _ - ALASKA t si}�- - - 333 West Seventh Avenue GOVERNOR BILL WALKER Anchorage, Alaska 99501-3572 Main: 907.279.1433 OFALAS'. Fax: 907 276.7542 www.aogcc.alaska.gov Ken AllenQ 0 (2 Engineering Team Leader t I J BP Exploration(Alaska), Inc. P.O. Box 196612 Anchorage, AK 99519-6612 I 'I L c,p�N Re: Prudhoe Bay Field, Prudhoe Bay Oil Pool, PBU S-44 , $E ► FEB 6' Sundry Number: 315-072 Dear Mr. Allen: Enclosed is the approved application for sundry approval relating to the above referenced well. Please note the conditions of approval set out in the enclosed form. As provided in AS 31.05.080, within 20 days after written notice of this decision, or such further time as the AOGCC grants for good cause shown, a person affected by it may file with the AOGCC an application for reconsideration. A request for reconsideration is considered timely if it is received by 4:30 PM on the 23rd day following the date of this letter, or the next working day if the 23rd day falls on a holiday or weekend. Sincerely, P1-1/t-v3SL- Cat y P. oerster Chair DATED this I 6y of February, 2015 Encl. STATE OF ALASKA RECEIVED ALASKA OIL AND GAS CONSERVATION COMMIkoION FEB 11 2015 • APPLICATION FOR SUNDRY APPROVAL ars ("SZT 20 AAC 25.280 AOGC 1. Type of Request: ❑Abandon ®Plug for Redrill • 0 Perforate New Pool 0 Repair Well 0 Change Approved Program ❑Suspend 0 Plug Perforations 0 Perforate 0 Pull Tubing 0 Time Extension ❑Operations Shutdown 0 Re-Enter Suspended Well 0 Stimulate 0 Alter Casing 0 Other 2. Operator Name 4. Current Well Class 5. Permit To Drill Number BP Exploration (Alaska) Inc. 0 Exploratory 0 Stratigraphic 197-006 • 3. Address: ®Development 0 Service 6. API Number P.O. Box 196612,Anchorage,Alaska 99519-6612 50.029-22735-00-00 7. If perforating: 8. Well Name and Number: What Regulation or Conservation Order governs well spacing in this pool? ./PBU S-44 Will planned perforations require a Spacing Exception? 0 Yes721 No 9. Property Designatior 10.Field/Pool(s): ADL 028257&028258 Prudhoe Bay Field/Prudhoe Bay Oil Pool • 11. PRESENT WELL CONDITION SUMMARY Total Depth MD(ft): Total Depth ND(ft): Effective Depth MD(ft) Effective Depth TVD(ft): Plugs(measured): Junk(measured)' 13150' . 8968' • 13128' 8969' None 9496'&9514' Casing Length Size MD ND Burst Collapse Structural _ Conductor 80' 20" 31'- 111' 31'- 111' 1490 470 Surface 3100' 9-5/8" 30'-3130' 30'-3130' 5750 3090 Intermediate 10175' 7" 29'- 10204' 29'-8946' 7240 5410 Production Liner 3191' 4-1/2" 9939'- 13130' 8901'-8969' 8430 7500 Perforation Depth MD(ft): Perforation Depth ND(ft): Tubing Size: Tubing Grade: Tubing MD(ft) Slotted Liner: 10927'- 13128' Slotted Liner:8988'-8969' 4-1/2", 12.6# 13Cr80/L-80; L-80 9245';9542'-9576' Packers and SSSV Type: 7"x 4-1/2" Baker S-3 Packer; Packers and SSSV 9105'/8537'; 7"x 4-1/2" Baker S-3 Packer; MD(ft)and ND(ft): 9236'/8624'; 7"x 4-1/2"Baker ML Packer 9542'/8767' 12. Attachments' 13.Well Class after proposed work: ®Description Summary of Proposal ®BOP Sketch 0 Detailed Operations Program 0 Exploratory 0 Stratigraphic ®Development 0 Service 14 Estimated Date for 15. Well Status after proposed work' Commencing Operation. March 1,2015 0 Oil 0 WINJ 0 WDSPL 0 Plugged 16. Verbal Approval: Date 0 Gas 0 GINJ 0 GSTOR 0 Abandoned Commission Representative: 0 WAG 0 SPLUG ®Suspended 17 I hereby certify that the foregoing is true and correct to the best of my knowledge. Contact: Jacob Leemhuis,564-4989 Printed Name: Ken Allen Title: Engineering Team Leader Email: Jacob Leemhuis@bp.com Signaturej ) Phone: 564-4366 Date: )1 l jS- Commission Use Only / r Conditions of approval: Notify Commission so that a representative may witness �' �/ Sundry Number \5 - 01 2 0 Plug Integrity Ly BOP Test 0 Mechanical Integrity Test 0 Location Clearance Other: 30p #-e51- /--o 3 5v0 p5 . ( A-1 '�P 15 2�o1,f5i /j r1n,) n K. pr'c lic-vi trr' fry t /o Z 5Uv ps,' , Spacing Exception Required? ❑Yes 0 No Subsequent Form Required: /U — g 0 7- APPROVED BY , Approved By: COMMISSIONER THE COMMISSION Date' 2---%O - 15 - Form 10-403 Revised 10 012 R 'Gl 4iAiIrfor 12 months fro the date of ap royal Submit In Duplicate VTL 2// �i' � � /A,Z-d's-/s ,.,31:. 2 ( 'is- RRnMS )R I=GR 9 1 '7111 0 bp GPj1p,11jg lay S-44 Sundry Application Well Type: Producer Current Status: The well is currently shut-in. Request: Approval is requested for the P&A of Prudhoe Bay well S-44 to sidetrack and complete S-44A. MIT-IA Passed to 3,500 psi (10/29/2014) PPPOT-T Passed to 5,000 psi (10/18/2014) PPPOT-IC Passed to 3,500 psi (10/18/2014) Well History: S-44 is currently an Ivishak producer that has a tubing tail fish near the S-44L1 window (been in the hole since 2006 which was mostly a product of the RWO), and a Baker whipstock fish that is located above the 7" x 4-1/2" packer at 9,562' MD (been in hole since 2003). With the exception of the two fish in the hole, the upper completion appears to be in good shape. Scope of Work: The sidetrack plan for the S-44A well includes the following: pre-rig operations will include setting a cement retainer and P&A laterals with 122 bbls of cement. Drift and tag top of cement, pull DGLV from Station 1 at 9,016' MD and circulate a cement plug into TBG x IA (-38 bbls). Drift and tag cement, perform CMIT-IA to 3,500 psi, and jet cut at 3,200' MD. Perform another CMIT-IA to 3,500 psi, install dry hole tree and set TWC. The rig will then move in and pull 4-1/2" tubing, run a clean out run, jet cut 7" casing at 3,000' MD and pull 7" to surface. Once the casing has been pulled, set an EZSV bridge plug in preparation to set the whipstock to exit the casing at -2,747' MD. A 7" intermediate casing will be set at the top of the Kuparuk River and 6-1/8" production hole will be drilled in the Kuparuk. Run 4.5" cementless/sliding sleeve production liner assembly with liner top packer. Run 4.5" tubing tied into top of production liner. MASP: 2,680 psi Estimated Start Date: March 1, 2015 0� ci �i °0 1616° � CO £M' -14&. w e I( cr'rvGf o R , T 0� �P�vl�r 0� t wAe ,'7 wqs lap" �y 1,� G rr P Tie dell //!G� sFile ,�F °y 6enPA - 40 flv r�,s "id co r «a dr c4/- rrac /P�re�ijr� -c, �_/ ✓sp i--Iv i7> 70 >''',7 e re Cd erg �Tp.✓1 T7 S i p00� Pre-rig prep work: Step Service Line Description of Work 1 E Set Cement Retainer 2 C P&A laterals with 122 bbls of cement 3 S D&T TOC. Pull DGLV from Sta 1 at 9016' MD. 4 F A/SL: CMIT-T 2500 psi. Circulate Cement Plug into TBG& IA-38 bbls of 15.8 Class G.TOC-8000' 5 F (length-1000' MD) 6 S D&T Cement. Drift for Jet Cut 7 F CMIT-IA to 3500 psi. 8 E Jet Cut TBG-3,200' MD. 9 F CMIT-IA to 3500 psi. 10 D Bleed T/I/O to 0 psi Proposed Drilling Rig Operations: 1. MIRU Parker 273. v/- 2. 2. Test TWC from below to 3,500 psi for 30 minutes. 3. Nipple down tree. Nipple up and test BOPE to 3,500 psi. 4. Pull TWC with lubricator. 5. RU hard lines to BOP. Circulate out diesel freeze protection through choke to tiger tank with clean 8.5 ppg seawater. 6. RU and pull the 4-1/2"tubing from the pre-rig jet cut. 7. RU E-Line and cut 7" casing at-3,000' MD. 8. RU and pull 7" casing from rig jet cut. 9. RIH with 9-5/8"clean out assemble down to the top of casing stub. 10. RU E-line w/GR/CCL log and set EZSV at-2,768 MD and pressure test to 3,500 psi for 30 min. Chart test. 11. PU 9-5/8"whipstock, bottom trip anchor and 8.5"window milling assembly (to include full gauge string mills). RIH to the top of the EZSV. Orient and set the whipstock. 12. Swap the well over to 9.0 ppg fresh water LSND milling fluid. End of Sundry: Start of Permit to Drill 13. Change 9-5/8" pack-off. Pressure test to 3,500 psi. 14. Mill window in the 9-5/8" casing plus 20' of formation. 15. Perform LOT. POH for drilling BHA. 16. MU 8-1/2" drilling BHA, GR/RES/NEU/DEN/PWD, UBHO (Gyro), and RIH. Kick off and drill 8-1/2" intermediate interval. 17. Drill 8-1/2" intermediate interval to section TD in TKC4 at-10,083' MD. Weight up drilling fluid using spike fluid maintaining the following density ranges: • KOP-5,260' TVDss: 9.2 -9.3 ppg • 5,260' TVDss-TD: 10.6 ppg 18. At TKC4, CBU until hole is clean (minimum 2x) and POH on elevators to the ghost reamer depth. 19. RBIH, circulate well clean, and POH on elevators. 20. Change upper VBR pipe rams to 7" casing rams and test to 250 psi low/ 3,500 psi high. 21. Run and cement 7", 26#, L-80, VAM TOP casing to TD. Top of cement will be at 3,247' MD. 22. Pressure test the 7" casing to 250 psi low/ 3,500 psi high for 5 minutes low/ 30 minutes 23. Change upper 7" casing rams to 2-7/8" x 5-1/2" VBR pipe rams and test to 250 psi low/ 3,500 psi minutes high when the plug bumps. 24. Install the 7" pack-off through the stack and test to 250 psi low/ 5,000 psi high for 30 minutes. 25. Freeze protect the 9-5/8" x 7" annulus, once the tail cement has reached compressive strength. 26. MU 6-'/8" drilling BHA with Insert bit, bent housing motor, and GR/RES/NEU/DEN. RIH to the landing collar and test the casing to 3,500 psi for 30 minutes. 27. Displace the well to 9.9 - 10.1 ppg Flo-Pro NT fluid prior to fully drilling out shoe track. 28. Drill 20' of new formation and perform a FIT. 29. Drill 6-1/8" hole to TD at 12,107' MD. 30. Circulate bottom ups and condition the hole as necessary. Backream to the 7" shoe, MAD passing as required. 31. Trip in hole to TD and circulate/condition the hole as necessary until shakers clean up. POH on elevators. 32. MU and run 4-W 13.5# 13CR VT sliding sleeve/swell packer liner to TD. 33. Drop a ball to land the ball on the ball seat in the toe of the well. 34. When the ball lands, set liner hanger and liner top packer. Prior to pulling the running tool, perform a pressure test on the liner top packer by testing the 7" casing x drill pipe annulus to 250 psi low/3,500psi high for 5 min low/30 min high. 35. Pull liner running tool above liner top. Displace well to clean 10.3 ppg Brine. 36. POH, L/D the liner running tool. 37. R/U and run a 4-%", 13.5#, 13CR, VAMTOP tubing completion with GLMS. Space out and land the tubing with tubing tail inserted into the liner tieback sleeve. 38. Make up tubing hanger per Cameron Rep. Land the tubing hanger, and run in lock down screws. 39. Reverse circulate filtered 10 ppg brine and corrosion inhibitor into the tubing x casing annulus. 40. Drop ball/rod and set packer and individually test the tubing and annulus to 3,500 psi for 30 minutes. Record each test. 41. Bleed tubing pressure to 2,000 psi. Pressure test the IA to 250 psi low/3,500 psi high for 5 minutes low/ 5 minutes high. 42. Hold pressure on the IA and bleed tubing pressure to zero, shearing the DCK shear valve. Pump both ways to confirm circulation ability. 43. With landing joint still rigged up, reverse circulate diesel freeze protect using rig injection pump. 44. Allow diesel to U-tube, drain stack, and rig down landing joint. Monitor well for 1 hour to confirm well is dead. 45. Install TWC and test from above to 250 psi low/3,500 psi high for 5 minutes each and from below to 250 psi low/ 3,500 psi high for 5 minutes low/30 minutes high. 46. Nipple down the BOPE. Nipple up the adaptor flange and double master valves and test to 5,000 psi with diesel. 47. Ensure Heet® is left on top of the TWC and only diesel (no water) is left in the tree. 48. Install all annulus valves and secure the well. Ensure T/IA/OA all have two barriers in place. 49. RDMO. Planned Post-Rig Operations: 1. Pull BPV, Pull Ball, Rod and RHC Plug with slickline. 2. Pull shear valve and dummies, install GLVs. 3. Open sliding sleeves as required by NWD PE. Flow back and clean up the well. 4. Install flow lines and well house. 5. Produce for—1 month to determine pre-frac PI. 6. Post pre-frac PI determination, conduct fracture stimulation. Drilling Engineer: Jacob Leemhuis (907) 564-4989 Production Engineer: Alex Youngmun (907) 564-4864 Geologist: Roger Sels (907) 564-5215 TREE= 4-1/16"CM/ SAFETY NOTES: WELL ANGLE>70 DEG @ 9586'. WELLHEAD= FMC ***F '.1 IS AN OH SLT'D LNR WIO PKR OR HGR(NOT ACTUATOR= BAKER C S-44 WL ESSIBLE).***FISH-BAKER WHIPSTOCK ON KB.ELEV= 67' TOP OF M L PKR @ 9514'(UNRETRIEVALBE BY RIG BF.ELEV= 35.7' , I AFTER DRILLING S-44L1)***4-1/2"CHROME TBG*** KOP= 4452' 20"CONDUCTOR - 110' _ Max Angle= 104°@ 10550' 2114' -14-112"HES X NIP,ID=3.813" Datum MD= 9-5/8"HES -I 1763' ' GAS LIFT MANDRELS Datum TVD= 8800'SS CEMENTER ST MD TVD DEV TYPE VLV LATCF PORT DATE L 5 3437 3437 0 KBG-2 DOME BK 12 05/25/11 9-5/8"CSG,40#,L-80 BUTT,ID=8.835" -I 3130' --40 C 4 5685 5585 29 KBG-2 DOME BK 16 05/25/11 3 7299 6891 31 KBG-2 DOME BK 16 05/25/11 Minimum ID = 3.725" @ 9567" 2 8364 7900 31 KBG-2 SO BK 24 05/25/11 1 9016 8465 32 KBG-2 DMY BK 0 03/20/11 4-1/2" HES XN NIPPLE 9084-7-1-14-1/2"HES X NIP,ID=3.813" X' r_ 9105' _I 7"x 4-1/2"BKR S-3 FKR,ID=3.875" 4-1/2"TBG.12.6#,13CR-80 VAM TOP, H 9191' 9128' -14-1/2"HES X NIP, ID=3.813" .0152 bpf, ID=3.958" 1.........---1 9200' -7"X 4-1/2"UNIQUE OVERSHOT 4-1/2"TBG STUB(JEWELRY LOG 09/03/06) 9195' I 9225' 1-14-1/2"HES X NIP,ID=3.813" X `- 9236' _1_17"x 4-1/2"BKR S-3 PKR,ID=3.875" 4-1/2"TBG,12.6#,L-80 IBM,.0152 bpf,ID=3.958" H 9245' I---_ 9528' -5-5/8"TIEBACK SLEEVE,ID=5.25" 7"RA TAG - 9298' I•--. 9532' -5"X 4-1/2"XO,ID=3.958" FISH-48'OF TBG TAIL @ L1 WINDOW 9496' (TAGGED 09/03/06) MILLOUT WINDOW(S-44L1)9506'-9518' 7"RA TAG 9505' ........ -___ FISH-28'BKR WHIPSTOCK(ON ML PKR) - 9514' _ 7"X 4-1/2"BKR ML PKR,ID=3.875" H 9542' K� �, _' 1 __ __- 9560' -4-1/2"HES X NIP,ID 3.813" I 4-1/2"TBG,12.6#, L-80 NSCT, .0152 bpf,ID=3.958" - 9576' I � 9567' I-I4-1/2"HES XN NIP,ID=3.725" ---- 9576' -14-1/2"WLEG,ID=3.958" 6"TM/TIEBACK SLV,ID=?" - 9939' I---` 4-1/2"LNR,12.6#,L-80 NSCT,.0152bpf,ID=3.958" H 12373' 7"X 4-1/2"TIW S-6 PKR, ID=3.868" H 9945' III 7"X 4-1/2"TIW DTH-S HYD LNR HGR, ID=3.925" -I 9951' L I 7"CSG,26#,L-80 STL, .0383 bpf. ID=6.276" -- 10204' I-,. 10876' -14-1/2"HES CEMENTER PHIFORATION SUMMARY 10878' -CTC EXT CSG PKR, ID=3.885" REF LOG: ANGLE AT TOP PERF: 65°@ 9532' :i Note:Refer to Production DB for historical perf data 13128' --IPBTD SIZE SPF ZONE INTERVAL Opn/Sqz DATE -- 4-1/2" SLTD SAG 09532-10306 C 05/02/97 S '` ,] 4-1/2" SLTD " 10392- 11502 C 05/02/97 4-1/2" SLTD " 11584-12350 C 05/02/97 4-1/2"SOLID LNR,12.6#,L-80 IBP, - 10927' i.0152 bpf, ID=3.958" 4-1/2" SLTD Z4 10927-13128 C 05/02/97 4-1/2"SLOTTED LNR, 12.6#,L-80 NSCT, .0152 bpf,ID=3.958" 13130' DATE REV BY COMMENTS DATE REV BY COMMENTS PRUDHOE BAY UNIT 05/03/97 N18E ORIGINAL COMPLETION 04/03/08 DHO/PJC DRLG DRAFT CORRECTIONS WELL: S-44 06/27/06 N7ES RWO 05/31/10 SEW/PJC GLV C/O(05/10/10) PERMIT No: 1970070 09/04/06 RRD/PJC FISH-48'TBG TAIL©9496 03/27/11 JM/PJC GLV C/O(3/20/11) API No: 50-029-22735-60 12/24/06 JPK/PAG GLV CIO(08/11/06)-CORRECT 06/01/11 SET/PJC GLV C/O(05/25/11) SEC 35,T12N,R12E, 1038'FNL&778'FWL 05/01/07 JRP/PJC GLV CIO 10/03/07 DAV/TLH GLV C/O BP Exploration (Alaska) TREE= 41116"CSW ----- — - WELLHEAD= FMC S4 -, . . ACTUATOR= BAKER C WL '�IS'.1� T' AN OH SLD LNR W/O PKR OR HGR(NOT E).'*'FISH-BAKER WHIPSTOCK ON KB.BEV= 67' P mposed P&A TOP OF ML PKR @ 9514'(UNRETRIEVALBE BY RIG BF.ELEV= 35,7' ' AFTER DRILLING S 44L11"'4-1/2"CHROME TBG'*" ' ri... KOP= 4452' 20"CONDUCTOR H110' _ Max Angie= 104',�� 10550' /� 2114' - -112"FES X NP,D=3.813" Datum M)= 9-5/8-I-ES H 1763' / GAS LFT MANDRELS Datum WD= 8800'SS CEMENTER I ST MD TVD DEV TYPE VLV _AM- PORT DATE g 518"CSG,40!!,L..-80 80 BUTT,I0.8.835 3130• _ A IL 5 3437 3437 0 KBG-2 DOkE BK 12 05/25/11 DI 4 5685 5585 29 KBG-2 DOLE BK 16 05/25/11 TOC a t 3,2 4 7'M D (3,17 9'T V D s s 1 3 7299 6891 31 KBG-2 DOME BK 16 05/25/11 235.75 bbls using 50% excess. 3 bbl. — in shoe track, tagged 6 bb]s high 2 8364 7900 31 KBG-2 SO BK 24 05/25/11 Total S]u ray V o]u m e = 245 bbl: 1 9016 8465 32 KBG-2 CLAY BK 0 03/20/11 TOC Ping = 8,348'M D (7,820'TVD ss) ----filo 4, , 9084• I-14-1/7 ws x KIP,D=3.813" Last centralizer on joint#165 = -3,280'ML I • •• DPZ1 SB-NA 4,887'TVDss (4,976'MD 2+ • 9105' _17"x 4-1/2"BKR S-3 PKR,D=3.875" Base1bBF 5,295'TVDss (5,432'MD) 4 • �. Squeeze Packer= -9,150'MD 0 IP� ' 9128' 41x1"HIrSXNP D=3.813" DPZ2 TKUP 6,580'TVDss (6,912'MD) -------- 9200' �7"X4 i/2"UNKJlEOVEf25HOT Base/TMLV 6,860'TVDss (7,236'M D) ' 9225' H4-1/7 HES X NP,0=3.813' DPZ3 TSGR 8,679'TVDss (9,495'MD Base 8,901'TVDss (13,150'MD) 9236' _1 7'x 4-1/2'BKR S-3 RR,D=3.875" 14-112"IBG,12.84,L-80 IBM,.0152 bpf,D=3.958' - 9245' 1._ 9528' H5-5/8'TIEBACK SLEEVE,D=5.25 r RA TAG I-i 9298' -1.---� 9532" --15"X 4-1/2"XO,D=3.958" FISH-48'OF TBG TA L @ LI WIDOW -1 9496' (TA(3GE009/03x06) MLLOUT WWOW(s-44L1)9506'-9518' 17"RA TAG--1 9605' -Ai FISH-28'BKR WHIPSTOCK(ON ML PKR) H 9514' f� 7'X 4-112"BKR M.PK1 D••3.875' H 9642' K..'."2 . / 'r .te /� C em entVollm es ■ \ 9660• LJ4-112"HES X NP,D=3.813" 1 Pg#2 = -122bh I I t Plillg#2 = -30.7.7 bbd V-1/2"TBG,12.6#,1-80 NSCT..0152 bpf.D=3.958" H 9576' / \ __ 9587' --14112'HES XN NP,D=3.725" 9576' 1-1±-2/2"WLEG,D=3.958" 6"MN TRACK SLV.D=r H 9939' 1 ] J 4-1/2'LNR,12.64,L-80 NSCT,-0152bpf,a -3958" 12373' L7'X 4-1/2'TM!5-6 PKR,0=3.868" H 9945' H 7"X 4-1/2"T1W Dili-SEW D LNR HGR ID=3.925' H 9951' '-'-` L 3---- r 7'CSG,26#,L-80 SR, .0383 bpf,D=6.276" 10204' --A L r- 10 10876' -14-1/2"FES CEMENTER PERFORATION SUMIIMRY 10878' -CTC EXT CSG PKR,D=3.885" REF LOG. ANGLE AT TOP PERF: 65'@ 9532' .0 Note:Refer to Roduction CB for histoncal pert data 1 SIZE SPF ZONE INTERVAL Opn/Sgz DATE 13128' HFBID 14-1/7 SLID SAG 09532-10306 C 05/02/97 0 14-1/2" SLID ' 10392-11502 C 05/02/97 14-1/2" SLID 11584-12350 C 05/02/97 4-1/2"SOLD LNR, 12.64,L-80 BP, -1 10927' ,li 4-1/7 SLTD Z4 10927-13128 C 05/02/97 .0152 bpf,D=3.958" 4-1/2"SLO I I W LNR 12.6#,L-80 NSCT,.0152 bpf,D=3.958" 13130'1 DATE I REV BY CON11E TS DATE ' REV BY CO v?v ''FTS PRU]HOE BAY UNIT 05/03/97 N18E ORIGINAL COMPLETION 04/03/08 I3-0/PJC DFLG CRAFT CORRECTIONS WELL- S-44 06/27/06 N7ES IaNO 05/31/10 SEW/PJC GLV C/O(05/10/10) PERMIT No '1970070 09/04/06 IYPJC FISH-48'TBG TAL @9496 03/27/11 NI PJC GLV C/O(3/20/11) _ AR Kb 50-029-22735-60 12/24/06 JR(/RAG GLV CIO(08/11/06)-CORRECT 06/01/11 SET/PJC GLV C/O(05/25/11) SEC 35, T12N,R12E,1038 FTL&778'FWL 05/01/07 JRPFPJC GLV CJO 09/29/14 JCL Roposed P&A for S-44A 10/03/07 fi DAV/TLH GLV 00 _^- BP Exploration(Alaska) TREE= "'EL "D= - RAC P RO P O. a S-44A 1 SAF- NOTES: WELL ANGLE>70•/a '. ACTUATOR= _ CKB ELEV= 67' BF.ELEV= 35.7 'CONO, � 110' 1.--I D a I 1763' H9-5/8"HES c13wenu KOP= 4452' -- --I t1 Max Angle= ___"@ ID==___ , , 2,000' H4-112"HES X NP,D=3.813" Datum MD= _ Datum TVD= 8800'SS 9-5/8'WHPSTOCK(._/_/_J -i -2747' ,` MLLOUT WINDOW(S-44A) -'2747'--2757' 9-5/8"CSG,40#,L-80 BTRS,D=8.835' H -2747' GAS LFT MANDRELS El ST MD ND 0EV TYPE VLV .ATO-PORT DATE 5 Minimum ID = 3.725" 4 4-1/2" HES XN NIPPLE 3 2 1 TOP OF CEMENT(Y/ /_) H 3,247' 14 _ ke 4 ' , to to 9,193' _H4-1/2"HES X NP,D=3.813" I4-1/2'NOPG Sapphire GaugeH 9,518' ' i 9,783' Hr X 4-1/2'HES TNT PKR,D=3.856' i ci ' , g 9,852' H4-1/2"HES X NP,D=3.813" A �/ 9,925' H4-1/2"HES X NP,D=3.813" 1 I. 1TOPOF 4-1/2'LIVER H 9,933' 4-1/2'TBG,12.6#,13CR-85 VAM TOP, H 9,938' /�1 j 9,938' H4-1/2'WLEG,D=3.958" .0152 bpi,D=3.958" t ►��' 7"26#,L-80 VTHC =Surface to 9,783'M D 7'CSG,26ak,L-80 VAM TOP HC,.0383 bpi,D=6.276" H 10,083' ►/, 7"26#,13Cr�OVT= -9,783'to 10,083'MD t I I4-1/2"SweNPackers, 13.5#, 13Cr-85 H ' c 1 X1 4-1/2'Frac Rated Skding Sleeve H 1 C :1 12K3 I 1 1 3-1/2"Anchor Sw eN Packer H -Ip pI 4-1/2'LNR,12.6#,13CR-85 JFE BEAR --1 12,107' .0152 bpi,D=3.920 MATE REV BY COP? 'ffS 0147E REV BY COMMENTS FRIAHOEBAY MT 05/03/97 N18E ORIGINAL COMPLETION WELL: S-44A 06/27/06 N7t'3 RWO PERMIT No: 10/14/14 JMD BULT PROPOSED AR N3: 50-029-22735- 02105/15 JCL REDESIGNED MRiNEE4ATE SEC 35,T12N,R12E 1038'FTL&778'F V L BP Exploration(Alaska) i _ PARKER 273 BOP STACK RAM TYPE BOP: DUTCH LOCK DOWN FLANGE SHAFFER LXT DOUBLE BOP 13 5/8"-5M B 13 5/8"-5M STUDDED TOP 13 5/8"-5M FLANGED BOTTOM """`"" W/(2) 14" UL2 OPERATOR, UPPER CAVITY ° ° ANNULAR BOP: AND (2) 14" PSLK W/BSTR OPERATOR, SHAFFER LXT 13 5/8" 5M 13-5/8" 5M STUDDED TOP LOWER CAVITY 0 13-5/8" 5M FLANGED BOTTOM 0 1 I DRILLING CROSS: 13 5/8"-5M FLANGED TOP il I 0 (O I li 13 5/8"-5M FLANGED BOTTOM °• o°°o o ° 0 o 0 3 o 0 ,_ II ° e ° II II 1 •• :...2... -.� 11 I I KILL LINE: r , (imI�t 'y1`/Gi%Y7� 2-1/16" 5M FLEX HOSE g��� A1 �Y� 1�\%�1 � � 1� �1 �';r V�l�l�1J 2-1/16" 5M X 3-1/8" 5M D.S.A. ` ,'� `I,' 3-1/8" 5M FLANGED MANUAL GATE VALVE MIIIII 0 3-1/8" 5M FLANGED HYDRAULIC GATE VALVE CE M rx• 00 •00 331 • I 1 I CHOKE LINE: RAM TYPE BOP: 3-1/8" 5M FLANGED MANUAL GATE VALVE SHAFFER LXT SINGLE 13 5/8" 5M 3-1/8" 5M FLANGED HYDRAULIC GATE VALVE 13 5/8"-5M STUDDED TOP 5M FLEX HOSE 13 5/8"— 5M FLANGED BOTTOM 3-1/8" W/(2) 14" UL2 OPERATOR Sundry Application Plug for Re-drill Wells Work Flow This process is used to identify wells that are suspended for a very short time prior to being re-drilled. Those wells that are not re-drilled immediately are identified every 6 months and assigned a current status of"Suspended." Step Task Responsible 1 The initial reviewer will check to ensure that the "Plug for Redrill" box in the Patricia or Steve / upper left corner of Form 10-403 is checked. If the "Abandon" or "Suspend" boxes are also checked, cross out that erroneous entry and initial it on both copies of the Form 10-403 (AOGCC's and operator's copies). 2 If the "Abandon" box is checked in Box 15 (Well Status after proposed Patricia or Steve work) the initial reviewer will cross out that erroneous entry and initial it on both copies of the Form 10-403 (AOGCC's and operator's copies). Instead, then check the "Suspended" box and initial that change. Guy or Victoria The drilling engineers will serve as quality control for steps 1 and 2. (QC) 3 When the Stat Tech receives a Form 10-403 with a check in the "Plug for Jenni Redrill" box, she will enter the Typ_Work code "IPBRD" into the History tab for the well in RBDMS. This code automatically generates a comment in the well history that states "Intent: Plug for Redrill." 4 When the Stat Tech receives any Form 10-407, she will check the History tab Jenni in RBDMS for the "Intent: Plug for Redrill" code (IPBRD). If present and there is no evidence that a subsequent re-drill has been COMPLETED, the Stat Tech will assign a status of SUSPENDED to the well bore in RBDMS no matter what status is listed on the 10-407. The Stat Tech will also change the status on the 10-407 form to SUSPENDED, and date and initial this change. If the Stat Tech does not see the "Intent: Plug for Redrill" comment or code, she will enter the status listed on the Form 10-407 into RBDMS. 5 When the Form 10-407 for the redrill is received, the Stat Tech will change Jenni the original well's status from SUSPENDED to ABANDONED. 6 The first week of every January and July, the Stat Tech and one of the Jenni Geologists will check the "Well by Type Work Outstanding" user query in Patricia or Steve RBDMS to ensure that all of the Plug for Redrill wells have been handled properly. At this same time, they will also review the list of suspended wells for accuracy. XHVZE Pages NOT Scanned in this Well History File This page identifies those items that were not scanned during the initial scanning project. They are available in the original file and viewable by direct inspection. File Number of Well History File PAGES TO DELETE RESCAN Color items - Pages: GraYScale, halftones, pictures, graphs, charts - Pages: Poor Quality Original- Pages: Other- Pages: DIGITAL DATA Diskettes, No. Other, No/Type 'OVERSIZED .Logs of various kinds Other COMMENI~: n Complete Scanned b ~',~w'~M~,~d.D'.r~ Nathan.~oweli TO RE-SCAN Notes: t~,., ~,.-..~,~n--~l htr' m:~,,~,4,, MU~e,.,.I I')~mlh~ Nathan Lowell Date: Regg, James B (DOA) From: AK, D &C Well Integrity Coordinator [ AKDCWeIllntegrityCoordinator @bp.com] � sit() Sent: Thursday, August 09, 2012 6:54 PM To: Regg, James B (DOA); Schwartz, Guy L (DOA); AK, OPS GC2 OSM; AK, OPS GC2 Field O &M TL; AK, OPS GC2 Wellpad Lead; AK, OPS Prod Controllers; Cismoski, Doug A; Daniel, Ryan; AK, D &C Wireline Operations Team Lead; AK, D &C Well Services Operations Team Lead; AK, RES GPB West Wells Opt Engr; AK, RES GPB East Wells Opt Engr; AK, OPS Well Pad SW; Black, Brittany Cc: AK, D &C DHD Well Integrity Engineer Subject: OPERABLE: Producer S -44 (PTD #1970060) TIFL Passed All, Producer S -44 (PTD #1970060) passed a TIFL confirming tubing integrity. The well is reclassified as Operable. Thank you, Mehreen Vazir ii SCANNED �A � 'J BPXA Well Integrity Coordinator From: AK, D &C Well Integrity Coordinator Sent: Sunday, August 05, 2012 11:43 AM To: 'Regg, James B '; 'Schwartz, Guy L DOA '; AK, OPS GC2 OSM; AK, OPS GC2 Field O &M TL; AK, OPS GC2 ( DOA ) Wellpad Lead; AK, OPS Prod Controllers; Cismoski, Doug A; Daniel, Ryan; AK, D &C Wireline Operations Team Lead; AK, D &C Well Services Operations Team Lead; AK, RES GPB West Wells Opt Engr; AK, RES GPB East Wells Opt Engr; AK, OPS Well Pad SW; Black, Brittany Cc: AK, D &C Well Integrity Coordinator; Wills, Shane M; Arend, Jon (NORTHERN SOLU P DNS LLC) Subject: UNDER EVALUATION: Producer S -44 (PTD #1970060) Begin Diagnostics f• Sustained Casing Pressure Above MOASP During Pro - Ration All, Producer S -44 (PTD # 1970060) had confirmed IA sustained asing pressure above MOASP during pro- ration. The well is now reclassified as Under Evaluation to begi • iagnostics for suspected TxIA communication. The well may be placed online while work is conducted to atte .t to restore integrity. Please call if you have any questions. Thank you, Gerald Murphy (alt. Mehreen Vazir) Well Integrity Coordinator Office (907) 659 -5102 Cell (907) 752 -0755 Email: AKDCWeIllntegrityCoordinator (a)BP.com 1 P6 U 5--114 . 1 ) 76 1 c7U042o Regg, James B (DOA) From: AK, D &C Well Integrity Coordinator [ AKDCWeIIlntegrityCoordinator @bp.com] Sent: Sunday, August 05, 2012 11:43 AM Kef f rib/ z To: Regg, James B (DOA); Schwartz, Guy L (DOA); AK, OPS GC2 OSM; AK, OPS GC2 Field O &M TL; AK, OPS GC2 Wellpad Lead; AK, OPS Prod Controllers; Cismoski, Doug A; Daniel, Ryan; AK, D &C Wireline Operations Team Lead; AK, D &C Well Services Operations Team Lead; AK, RES GPB West Wells Opt Engr; AK, RES GPB East Wells Opt Engr; AK, OPS Well Pad SW; Black, Brittany Cc: AK, D &C Well Integrity Coordinator; Wills, Shane M; Arend, Jon (NORTHERN SOLUTIONS LLC) Subject: UNDER EVALUATION: Producer S -44 (PTD #1970060) Begin Diagnostics for Sustained Casing Pressure Above MOASP During Pro - Ration All, Producer S -44 (PTD # 1970060) had confirmed IA sustained casing pressure above MOASP during pro- ration. The well is now reclassified as Under Evaluation to begin diagnostics for suspected TxIA communication. The well may be placed online while work is conducted to attempt to restore integrity. Please call if you have any questions. Thank you, Gerald Murphy (alt. Mehreen Vazir) Well Integrity Coordinator SCANNED ivlAY 0 7 2013 Office (907) 659 -5102 Cell (907) 752 -0755 Email: AKDCWeIIlntegrityCoordinator (c(c�BP.com From: AK, D &C Well Integrity Coordinator Sent: Saturday, June 30, 2012 5:13 PM To: 'Schwartz, Guy L (DOA)'; 'Regg, James B (DOA)'; AK, OPS GC2 OSM; AK, ' •S GC2 Field O &M TL; AK, OPS GC2 Wellpad Lead; AK, OPS Prod Controllers; Cismoski, Doug A; Daniel, Ryan; , D &C Wireline Operations Team Lead; AK, D &C Well Services Operations Team Lead; AK, RES GPB West Wells Opt - gr; AK, RES GPB East Wells Opt Engr; AK, OPS Well Pad SW; Black, Brittany Cc: AK, D &C Well Integrity Coordinator; AK, D &C DHD Well Integri Engineer; Walker, Greg (D &C); Clingingsmith, Mike J; LeBaron, Michael J Subject: NOT OPERABLE: Producer S -44 (PTD #1970060) Su -fined Casing Pressure Above MOASP During Pro - Ration AII, Producer S -44 (PTD # 1970060) has confirme ' A sustained casing pressure above MOASP during pro- ration. The wellhead pressures were tubing /IA/OA e I to SSV /2080/40 on 06/28/2012. The well has been reclassified as Not Operable until such time that the well diagn tics can be performed. Plan forward (Post pro- ration) r 7� 1. WIC: Reclassify well as,Lider Evaluation 1 OPERABLE: Producer S -44 (PTD #1•60) Tubing Integrity Restored Page 1 of 1 Regg, James B (DOA) From: AK, D &C Well Integrity Coordinator [ AKDCWeIIIntegrityCoordinator @bp.com]et, ZZ'r( Sent: Friday, February 18, 2011 8:59 PM To: Maunder, Thomas E (DOA); Regg, James B (DOA); Schwartz, Guy L (DOA); AK, OPS GC2 OSM; AK, OPS GC2 Wellpad Lead; Engel, Harry R; Cismoski, Doug A; AK, D &C Well Services Operations Team Lead; AK, D &C Wireline Operations Team Lead; AK, OPS Prod Controllers; AK, RES GPB West Wells Opt Engr; AK, OPS GC2 Field O &M TL; AK, OPS GC2 Ops Lead Cc: AK, D &C Well Integrity Coordinator; Walker, Greg (D &C) Subject: OPERABLE: Producer S -44 (PTD #1970060) Tubing Integrity Restored All, Producer S -44 (PTD #1970060) has passed a TIFL on 02/18/2011 after putting the well on production. The passing test verifies tubing integrity. - The wellhas been reclassified as Operable and may be placed on production when convenient for operations. Please call if you have any questions. Thank you, Gerald Murphy (alt. Torin Roschinger) Well Integrity Coordinator . L O 8 (1, Office (907) 659 -5102 Cell (907) 752 -0755 Pager (907) 659 -5100 Ext. 1154 From: AK, D &C Well Integrity Coordinator Sent: Sunday, February 06, 2011 2:29 PM To: 'Maunder, Thomas E (DOA)'; 'Regg, James B (DOA)'; 'Schwartz, Guy (DOA) <guy.schwartz @alaska.gov >'; AK, OPS GC2 OSM; AK, OPS GC2 Wellpad Lead; Engel, Harry R; Cismoski, Doug A; AK, D &C Well Services Operations Team Lead; AK, D& ireline Operations Team Lead; AK, OPS Prod Controllers; AK, RES GPB West Wells Opt Engr; AK, OPS GC2 Field O&M TL; AK, OP C2 Ops Lead Cc: King, Whitney; Sayed, Mohamed; AK, D &C Well Integrity Coordinator Subject: UNDER EVALUATION: Producer S -44 (PTD #1970060) Sustained casing pressure • the IA All, Producer S -44 (PTD # 1970060) was found to have sustaine. casing pressure on the IA. The wellhead pressures were tubing /IA/OA equal to SSV/2080/160 psi op 02/04/11. The well will be reclassified as Under Evaluation while diagnostics are performed. The plan forward is as follows: 1. DHD: POP and TIFL 2. Slickline: Change out GLVs pending TIFL -sults 3. DHD: Re -TIFL f .. A TIO plot and welibore schematic have been included for reference. Thank you, Torin Roschinger (alt. Jerry Murphy) Well Integrity Cooator Office (907) 659 -5102 Harmony Radio x2376 Cell (406) 570 -9630 Pager (907) 659 -5100 Ext. 1154 2/22/2011 UNDER EVALUATION: Producer S•(PTD #1970060) Sustained casing pre,re on the IA Page 1 of 1 Regg, James B (DOA) From: AK, D &C Well Integrity Coordinator [AKDCWelllntegrityCoordinator @bp.com] Sent: Sunday, February 06, 2011 2:29 PM )C ,/ 717 To: Maunder, Thomas E (DOA); Regg, James B (DOA); Schwartz, Guy L (DOA); AK, OPS GC2 OSM; AK, OPS GC2 Wellpad Lead; Engel, Harry R; Cismoski, Doug A; AK, D &C Well Services Operations Team Lead; AK, D &C Wireline Operations Team Lead; AK, OPS Prod Controllers; AK, RES GPB West Wells Opt Engr; AK, OPS GC2 Field O &M TL; AK, OPS GC2 Ops Lead Cc: King, Whitney; Sayed, Mohamed; AK, D &C Well Integrity Coordinator Subject: UNDER EVALUATION: Producer S-44 (PTD #1970060) Sustained casing pressure on the IA Attachments: S-44 TIO Plot 02- 06- 11.doc; S- 44.pdf All, Producer S -44 (PTD # 1970060) was found to have sustained casing pressure on the IA. The wellhead pressures were tubing /IA/OA equal to SSV/2080/160 psi on 02/04/11. The well will be reclassified as Under Evaluation while diagnostics are performed. The plan forward is as follows: 1. DHD: POP and TIFL t 4NED FEB 2 8 2011 2. Slickline: Change out GLVs pending TIFL results - 3. DHD: Re -TIFL A TIO plot and wellbore schematic have been included for reference. «S -44 TIO Plot 02- 06- 11.doc» «S- 44.pdf» Thank you, Torin Roschinger (alt. Jerry Murphy) Well Integrity Coordinator Office (907) 659 -5102 Harmony Radio x2376 Cell (406) 570 -9630 Pager (907) 659 -5100 Ext. 1154 2/7/2011 PBU S -44 PTD 1970060 2/6/2011 TIO Pressures Plot Well: S -44 4,000 - • 3,000 - — 0— Tbg — M— IA 2,000 - --46- OA 00A On 1,000 - 11/06/10 11/13/10 11/20/10 11127/10 12/04/10 12/11110 12/1 8/10 1 2/25/1 0 01/01/11 01/08/11 01/15/11 01/22/11 01/29/11 02/05/11 TREE = 4-1/16" OW SAFETY 11111.S: WELL ANGLE > 70 DEG @ 9586'. WELLHEAD = FMC 41 I ,," . S-44 WAN OH SLTD LNR W/O PKR OR HGR (NOT XotITAT6Fi=-:---E3AKE14d S - 44 WL ACCESSIBLE). "*" FISH - BAKER WHIPSTOCK ON KB. ELEV = 67' TOP OF ML PKR @ 9514' (UNRETRIEVALBE BY RIG BF. ELEV = 35.7' AFTER DRILLING S-44L1) """ 4-1/2" CHROME TBG*"" KOP = 445i 120" CONDUCTOR 1-1 110' _F- Max Angle = 104° @ 10550' = [ 2114' 1-14-1/2" HES X NIP, ID = 3.813" 1 __ Datum MD = 9-5/8" HES -I 1763' I GAS LIFT MANDRELS I Datum TVD = 8800' SS CEMENTER ST MD TVD DEV TYPE VLV LATCF PORT DATE 5 3437 3437 0 KBG-2 DOME BK 12 05/10/10 9-5/8" CSG, 40#, L-80 BUTT, ID = 8.835" . 1-[ 3130' F .-) DI 4 5685 5585 29 KBG-2 DOME BK 16 05/10/10 3 7299 6891 31 KBG-2 DOME BK 16 05/10/10 Minimum ID = 3.725" @ 9567" 2 8364 7900 31 KBG-2 DMY BK 0 06/24/06 1 9016 8465 32 KBG-2 SO BK 24 05/10/10 4-112" HES XN NIPPLE I r 9084' H4-1/2" HES X NIP, ID = 3.813" N N 9105' , I47" x 4-1/2" BKR S-3 PKR, ID = 3.875" 1 4-1/2" TBG,12.6#, 13CR-80 VAM TOP, -199" .....,,, 1 Ir.--------1 9128' 1-14-1/2" HES X NIP, ID = 3.813" I .0152 bpf, ID = 3.958" 9200' H7" X 4-1/2" UNIQUE OVERSHOT 1 4-1/2" TBG STUB (JEVVELRY LOG 09/03/06) H 9195' i I 1 9225' H4-1/2" HES X NIP, ID = 3.813" 1 9236' . 14 7" x 4-1/2" BKR S-3 PI<R, ID = 3.875" 1 4-1/2" TBG,12,6#, L-80 IBM, .0152 bpf, ID = 3.958" H 9245' I---_____ ------- 9528' 1-t5-5/8" TIEBACK SLEEVE, ID = 5.25" 1 7" RA TAG1-1 9298' I-. 9532' I-I5" X 4-1/2" X0, ID = 3.958" 1 FISH - 48' OF TBG TAIL @ L1 WINDOW 9496' (TAGG ED 09/03/06) MILLOUT WINDOW (S-44L1) 9506' - 9518' 17" RA TAG I-I 9505' 1-_. - - - .... FISH - 28' BKR WHIPSTOCK (ON ML PKR) H 9514' - - - - _ _ ..... .... IIMII - ---- _ 17" X 4-1/2" BKR ML PKR, ID = 3.875" H 9542' 1- S41_1 I _ a 9560' -I 4 1/2" HES X NIP, ID = 3.813" I 1 111 14-1/2" TBG,12.6#, L-80 NSCT, .0152 bpf, ID = 3.958" H 9576' I-- / 9567' H4-1/2" HES XN NIP, ID = 3.725" 9576' H4-1/2" WLEG, ID = 3.958" I 1 TIW TIEBACK SLV, ID = ?" H 9939' I 7" X 4-1/2" TM/ S-6 PKR, ID = 3.868" 9945' 14-1/2" LNR,12.6#, L-80 NSCT,.0152bpf, ID= 3.958" I 12373' 1 I Inan ,,MV 45.1r1,1 648N 7" X 4-1/2" TIW DTH-S HY D LNR HGR, ID = 3.925" 1-1 ....,, 9951' 8 8 1 1 7" CSG, 26#, L-80 STL , .0383 bpf, ID = 6.276" I-I 10204' I- 10876' -14-1/2" HES CEMENTER 1 PERFORATION SUMMARY 10878' --I CTC EXT CSG PKR, ID = 3.885" I REF LOG: ....."*"--...„........ Av ANGLE AT TOP PERF: 65° @ 9532' Note: Refer to Production DB for historical perf data -- - 13128' -I P8TD I .... SIZE SPF ZONE INTERVAL Opn/Sqz DATE -.. -....... .. 4-1/2" SLTD SAG 09532 - 10306 C 05/02/97 -S - *-- 4 A .... -S . ... 4-1/2" SLTD " 10392 - 11502 C 05/02/97 -..... 4-1/2" SOLID LNR, 12.6#, L-80 IBP, -I 10927' I .. 4-1/2" SLTD " 11584 - 12350 C 05/02/97 .. -.. 4-1/2" SLTD Z4 10927 - 13128 C 05/02/97 .0152 bpf, ID = 3.958" i 14-1/2" SLOTTED LNR, 12.6#, L-80 NSCT, .0152 bpf, ID = 3.958" I 13130' DATE REV BY COMMENTS DATE REV BY COMMENTS PRUDHOE BAY UNIT 05/03/97 N18E ORIGINAL COMPLETION 04/03/08 DHO/PJC DRLG DRAFT CORRECTIONS WELL: S-44 06/27/06 N7ES RWO 05/31/10 SEW/PJC GLV C/O (05/10/10) PERMIT No: n970070 09/04/06 RRD/PJC FISH-48' TBG TAIL © 9496 API No: 50-029-22735-60 12/24/06 JPK/PAG GLV C/O (08/11/06)-CORRECT SEC 35, T12N, R12E, 1038' FNL & 778' FWL 05/01/07 JRP/PJC GLV C/O 10/03/07 DAV/TLH GLV C/O BP Exploration (Alaska) Reviewed By: Safety Valve & Well Pressures Test Report P.l.3uprv~~-- z~~~ Comm Pad: PI31J_S InspDt: 2!18/2008 Inspected by John Crisp Interval InspNo svsJCr08022 1 1 40934 Related Insp: Field Name PRUDHOE BAY Operator BP EXPLORATION (ALASKA) INC Operator Rep Rich Vincent Reason 180-Day `~ Src: Inspector _. _ _ _ - - - _ ..... -- - - Well Data Pilots SSV' SSSV Shutln Dt 6Ve11 Type ; Well Pressures I~ Gas Lift Waiver i Comments ~ Well Permit Separ Set UP Test Test Test Date Sf OiI,WAG,GINJ, Inner Outer Tubing Number Number PSI PSI Trip Code Code Code GAS,CYCLE, SI PSI PSI PSI Yes/No Yes/No _ _ 00 2000780 ~ _ -_ - __ 1S3 ~ _ 1 -. i 125 - - + 125 -- I -- P ; - - - ~ - -- Y --- I ~ I { -- - ---T ~ --- - -~ - -- 1-OlL ` - - - ~ ---- ---- ___ ____ _ - _ ~ - _ T 03 2001680 ~ OS 2001520 - -- 06 i 2010120 ~ - -- - 08 ~, 2011000 153 - 153 153 -- 153 f 125 25 ~ - 125 125 120 ~ -- ' I10~ 40 125 P --- -P i 30 - P i ~ P - -- I P - P P - ---- - - i ~ _- _ _ -- --- ~ l-OIL ~ - - - _ I-OIL -- 1-OIL 1-OIL ~ _ -- I - _ ~_- ~ t-- 1 __ _ ~ ~ _-_ - - ~ - - _ -- ~ _- . - _ - -- -I i - - 09 ~ 2022450 - - - ---- - - ---- B _ - 153 -- 125 125 -- - P -- - _ P ~ _ - -j+II r-- - 1-OlL --{ ---- --- -t -- -^-~_-_ ~ - -- - ~ -___ - - }-- I ~ 1.- .~-._ .-~ . _ 1 ~ 2022300_ ~ -- _.-_- 153 ~ .-~_ j 1255 ---- X120 - P_-- , - P i _- -_ I} -_._____. l-OIL -_ ~ ~ --- -j ---- --i - l7 i 2030120 ~ 153 ~ 125 ! 135 -- _ P - P -- _ ~ -- ~ 1-OIL I _ ' - _ T 21 ! 2060410 IS3 j !25 125 P P 1-O1L ! _-- - - - - -- I ~ - - - 22 ~ - 2050810 _ 25 ~ 2070830 153 153 - ~25 --125 110 I IS P } ~- ~-- P -Y -I - - -- - ~ 1_OIL -r-- -i I-OIL -- - ~ i 7C 2020070 3A ! 2021630 2042130 3A 153 1 153 153 l 125 1 t 125 125 110 100 -~ 125 P I P -- P P P ~ P _ _ - - t-OIL _ i 1-OIL -1-----~ 1-0lL , -- - --- - - _ t--- -- - i - I - __ _ t4 I 1970060 -.J._ _._~ jl 153 . ~! - 125 ._ __ 100 -~ P -_ P ~-- _~ I . --. --1 _ _ 1-O1L - - __~_- - ~ L---. _-.-~ _ __- _ ~I .__-_-_ - Comments _--_ ~ (~C,`l~~tt.'~-~ ~=~,ctl~c.~Z~- l /~ ~?i'~' (~tP 3SL'vQ , ~~ wu~~ee!~~ ~~d~ ~~~ ~ AR 1 9 20D~ -'~ _- _ _ . ~ - -- --- --- --,I i i __ -- __ __ i - - - -- - - _ rformance Wells Components Failures Failure Rate I --16 -- - 32-- - - --1 _- -_. ___ _ 3.12%-- - c~ • Monday, February 25, 2008 RE: S-44Ll (PTD #1970070) UNDWV ALUATION for sustained casing .sure - TxIA Communi... Regg, James B (DOA) Page 1 of2 From: NSU, ADWWelllntegrity Engineer [NSUADWWelllntegrityEngineer@BP.com] Sent: Sunday, September 16,20078:36 AM To: Maunder, Thomas E (DOA) Cc: Regg, James B (DOA); Engel, Harry R; NSU, ADW Well Integrity Engineer Subject: RE: S-44L 1 (PTD #1970070) UNDER EVALUATION for sustained casing pressure - TxlA Communication ~l'11 cr!{il01 Tom, I agree that this notice should apply to the motherbore S-44 (prD #1970060) not the lateral S-44L 1. Should I resend the notice for file clean up or will this suffice? Thank you, Andrea Hughes 5~NED Sf? 2 1 2007 From: Maunder, Thomas E (DOA) [mailto:tom.maunder@alaska.gov] Sent: Thursday, September 06,2007 1:26 PM To: NSU, ADW Well Integrity Engineer Cc: Jim Regg; Engel, Harry R Subject: RE: S-44L1 (PTD #1970070) UNDER EVALUATION for sustained casing pressure - TxIA Communication Anna, v' Thanks for the notice. Shouldn't the applicable well be the motherbore S-44 (197-006)? I know laterals can sometimes introduce complications; however it seems appropriate that this sustained casing pressure notice should be for the motherbore. Call or message with any questions. Tom Maunder, PE AOGCC From: NSU, ADW Well Integrity Engineer [mêliltQ:NSUAPWWelllntegrityl;ngineer@ßP.cpm] Sent: Wednesday, September 05,20073:30 PM To: GPB, GC2 Well pad Lead; GPB, GC2 OTL; GPB, Area Mgr West (GC2jWRD); Rossberg, R Steven; Engel, Harry R; NSU, ADW Well Operations Supervisor; GPB, Wells Opt Eng; GPB, Optimization Engr; GPB, Prod Controllers; Regg, James B (DOA); Maunder, Thomas E (DOA); Fleckenstein, Robert J (DOA); Ohms, Danielle H; NSU, ADW WL & Completion Supervisor Cc: NSU, ADW Well Integrity Engineer; Roschinger, Torin T. Subject: S-44L1 (PTD #1970070) UNDER EVALUATION for sustained casing pressure - TxIA Communication Hi all, /' Well S-44L 1 (PTD #1970070) has been found to have sustained casing pressure on the IA. The wellhead pressures were 2180/2160/11 psi on 09/03/07. A subsequent TIFL failed the following day on overnight build-up of IA pressure. The well has been reclassified as Under Evaluation and may be produced under a 28-day clock. /'/ The plan forward for this well is as follows: 1. D: TIFL - FAILED 9/19/2007 RE: S-44Ll (PTD #1970070) UNDWV ALUATION for sustained casing pressure - TxIA Communi... Page 2 of2 2. APE: Eval DGL V design . 3. S: Set DGL Vs 4. D: Re-TIFL A wellbore schematic has been included for reference. «Pile: S-44L1.pdf» Please call with any questions or concerns. Thank you, }lnna (])u6e, œ. P.. Well Integrity Coordinator GPB Wells Group Phone: (907) 659-5102 Pager: (907) 659-5100 x1154 9/19/2007 a STATE OF ALASKA ~p¿ .)j/Ob RECEIVED AL~ OIL AND GAS CONSERVATION COMMISSION JUL 1 1 2006 REPORT OF SUNDRY WELL OPERATIONS . . Alaska Oil & Gas Cons. COtTIT1Isslon 1. Operations Performed: o Abandon o Alter Casing o Change Approved Program 2. Operator Name: BP Exploration (Alaska) Inc. 3. Address: P.O. Box 196612, Anchorage, Alaska 7. KB Elevation (ft): 8. Property Designation: ADL 028258 11. Present well condition summary Total depth: measured Effective depth: true vertical measured true vertical Casing Structural Conductor Surface Intermediate Production Liner Perforation Depth MD (ft): Perforation Depth TVD (ft): o Repair Well 181 Pull Tubing o Operation Shutdown Length 110' 3098' 10175' 3191' 67' 13150 8968 13127 8969 o Plug Perforations o Perforate New Pool o Perforate o Stimulate o Waiver o Time Extension o Re-Enter Suspended Well o Other 99519-6612 4. Well Class Before Work: 181 Development 0 Exploratory o Stratigraphic 0 Service 5. Permit To Drill Number: 197-006 6. API Number: 50-029-22735-00-00 9. Well Name and Number: PBU 8-44 10. Field 1 Pool(s): Prudhoe Bay Field 1 Prudhoe Bay Pool feet feet Plugs (measured) None feet Junk (measured) 9514 feet Size MD TVD Burst Collapse 20" 110' 110' 1490 470 9-5/8" 3130' 3130' 5750 3090 7" 10204' 8946' 7240 5410 4-1/2" 9939' - 13130' 8901' - 8969' 8430 7500 10927' - 13128' 8988' - 8969' 12. Stimulation or cement squeeze summary: Intervals treated (measured): Oil-Bbl Signature Form 10-404 Revised 04/2006 4-1/2", 12.6# 13Cr80 1L-80 9293'& Tubing Size (size, grade, and measured depth): Packers and SSSV (type and measured depth): 7" x 4-1/2" Baker 'ML' packer; 7" x 4-1/2" Baker 'S-3' packer; 7" x 4-1/2" Baker 'S-3' packer 9542'; 9236'; 9105' Treatment description including volumes used and final pressure: RBDMS BFL JUL 11 2006 13. Re resentative Dail Avera e Production or In'ection Data Gas-Mcf Water-Bbl Casin Pressure Tubin Pressure Prior to well operation: Subsequent to operation: 14. Attachments: 0 Copies of Logs and Surveys run 15. Well Class after proposed work: o Exploratory 181 Development 0 Service 181 Daily Report of Well Operations 16. Well Status after proposed work: 181 Well Schematic Diagram 181 Oil 0 Gas 0 WAG 0 GINJ 0 WINJ 0 WDSPL 17. I hereby certify that the foregoing is true and correct to the best of my knowledge. Sundry Number or N/A if C.O. Exempt: Contact Matt Martyn, 564-4101 N/A Printed Name Terrie Hubble Title Technical Assistant Phone Date 071tolo~ Terrie Hubble, 564-4628 Submit Original Only Prepared By Name/Number: 564-4628 TREE = WELLHEAO.= ACTUATOR = KB. ELEV = BF. ELEV = KOP= Max Angle = Datum MO = Oatum lVO = 4-1/16" CNV FMC BAKER 66.2' 35.7' 4452' 104 @ 10550' e I HES CMTR H 8800'SS I 9-5/8" CSG, 40#, L-80, 10 = 8.835" I Minimum ID = 3.725" @ 9567" 4-1/2" HES XN NIPPLE 4-1/2"TBG,12.6#,13-Cr-80, 10=3.958" I 4-1/2" TBG,12.6#, L-80, .0152 bpf, 10 - 3.958" H I RA PIP TAG I I RA PlPTAG I I FISH - 28' BKR WHIPSTOCK ON TOP OF ML PKR I I 7" X 4-1/2" BKR ML PKR, 10 = 3.875" I I 4-1/2" HES X NIP, 10 = 3.813" 1 I 4-1/2" HES XN NIP, 10 = 3.725" I I 4-1/2" WLEG, 10 = 3.958" I S -44 L 1 FROM DRLG - DRAFT 1763' ~ 3130' ~ 9195' I 9292' I 9381' 1--1 9505' 1--1 9514' I I 9542' I I 2:S. 9560' I I 9567' I 9576' I Y NOTES: > 70 DEG @ 9690' & > 90 DEG @ 12063', * S-44 L 11S AN OH SL T'D LNRW/O PKR OR HGR NOT WL ACCESSIBLE ASH: BAKER WHIPSTOCK ON TOP OF ML PKR@ 9514', RIG WAS UNABLE TO RETRIEVE IT AFTER DRILLING S-44 L 1.***CHROMETBG*** : I · 2114' 1-14-1/2" X-NIP, 10 3.813" I GAS LIFT MANORELS ST MO lVO OEV TYPE VLV LATCH PORT OATE ~ 5 3437 3437 0 KBG-2 OMY 8K 0 06/24/06 4 5685 5585 29 KBG-2 DMY BK 0 06/24/06 3 7299 6981 31 KBG-2 DMY BK 0 06/24106 2 8364 7900 31 KBG-2 DMY BK 0 06/24106 1 9016 8465 32 KBG-2 DCK BEK 0 06/24/06 I 9084' -14-112" HES X NIP, 10 = 3.813" I I 9104' ~ 7" x 4-1/2" BKR S-3 PKR, 10 = 3.875" I 9128' -14-1/2" HESX NIP, 10- 3.813" I 9200' H Tubing Cut w / Unique Overshot I 9225' -14-1/2" HES X NIP, 10 = 3.813" 1 9236' -17" x 4-1/2" BKR S-3 PKR, ID = 3.875" I 9259' -14-1/2" HES X NIP, 10 = 3.813" I 9280' -14-1/2" HES X NIP, 10 - 3.813" I I 9293' -14-1/2" WLEG, 10 = 3.958" 1 --:- --..!: I I 8 I ~ ¡.:::;...;;::o . . I I :8: :;g;: I . I · J ~ I 9528' H BKR SEITING SL V, 10 = 5.250" I . --__ I 9532' HTOPOF4-1/2"SLTOLNR I .~ \'-- -- roo::::::::>\.... -.......... ~ '" ............. .................. ............ I -.......... .... .... .... -.......... .... .... II I 7" CSG MILLOUT WINDOW .... 9506' - 9518' (S-44 L 1) I B1M OF 4-112" SL TD L"" H -123~¿ I I 4-1/2"SL TO LNR,12.6#,L-80,.0152bpf, 10= 3.958" 1 12373' ~ I TOP OF TNV TIEBACK SLV, ID = 5.374" 1- 9939' I I -, I 7" X 4-1/2" TNV S-6 PKR, 10 = 3.868" 1- 9945' I ~ iF I 7" X 4-1/2" TIW OTH-S HGR, 10 = 3.925" 1- 9951' I I 7" CSG, 26#, L-80, .0383 bpf, 10 = 6.276" I 10204' ~ PERFORATION SUMMARY REF LOG: SLOTTED LINER ANGLE AT TOP PERF: 65 @ 9532' Note: Refer to Production OB for historical perf data SIZE SPF INTERV AL Opn/Sqz DA TE S-44 L 1 9532 - 10306 10392 - 11502 11584 - 12350 S-44 4-1/2" SLTO 10927 -13128 4-1/2" SL TO 4-1/2" SLTO 4-1/2" SL TO C C C 05/02/97 05/02/97 05/02/97 C 05102/97 OA TE REV BY COMMENTS 05/02197 ORIGINAL COM PLETION 03/26/02 CHlKAK CORRECTIONS 05/02/03 PPIKAK WELL NAME & API # REV 09/25/05 WTS/TLH XX PLUG SET (06/17/03) 06/10/06 MJM Proposed RWO Completion 06/27/06 LV Actual Completion 10878' H CTC EXT CSG PKR, 10 = 3.885" I rl 10927' HTOPOF4-1/2"SLTOLNR I ... ... ... ... " ... ... ... ... ... ... ... ... ... ... ... I B1M OF 4-112" SLTOLNR H 1312B~'~ll I 4-1/2" SL TO LNR, 12.6#, L-80, .0152 bpf, 10 = 3.958" 1 13130' / HES CMTR H 10875' I DATE 13127' I~ REV BY COMMENTS PRUDHOE BA Y UNrT WELL: S-44 L 1 PERMrT No: 1970070 API No: 50-029-22735-60 SEC 35, T12N, R12E, 4242' NSL & 4502' WEL BP Exploration (Alaska) e e S-44 / S-44L 1 Prudhoe Bay Unit 50-029-22735-00 197 -006 Accept: Spud: Release: Ri: 06/23/06 N/A 06/27/06 Nabors 7ES PRE-RIG WORK 06/10/06 DRIFTED TO 9400' SLM, WI 3.80" GAUGE RING, 4.5" 'X' EO PRONG BRUSHED LOWER 'X' NIPPLES WI 3.80" GAUGE RING, 4 1/2" BL BRUSH RIH WI 4.5" XX PLUG. 06/11/06 SET 4 112" XX PLUG AT 9245' SLM (T =480 IA=750) (8) 1/8" EO, PORTS RAN 41/2" CK SET (GOOD SET). BLED TUBING PRESSURE DOWN 300 PSI (GOOD TEST). 06/14/06 RIH WI 3.5" 10' DUMP BAILER AND SLUGGlTS, DUMP SLUGGITS FROM 9254' SLM TO 9245' SLM. 06/15/06 RIH W 13.25" CENT TO 9243' SLM, 10' OF SLUGGITS ARE ON TOP OF XX TTP. 06/18/06 ATTEMPT 3.65" JET CUT AND TOOLS SET DOWN 6165'. POOH TO FIND ONLY SMALL AMOUNT OF TARlPARAFIN ON CENTRALIZERS. WELL SHUT IN. 06/19/06 DRIFTED WI 3.75" LIB TO 9210' SLM, IMPRESSION OF SLUGGITS. DRIFTED WI 3.70" CENT, 4.5" BLB AND 3.80" G-RING TO 9210' SLM. ENCOUNTERED NO PROBLEMS. JET CUT TUBING AT 9195', MIDDLE OF FIRST FULL JOINT ABOVE PACKER, USING 3.65" SLB POWER CUTTER, SAT DOWN AT 9240', JOB COMPLETE. e Legal Well Name: Common Well Name: Event Name: Contractor Name: Rig Name: 5-44 S-44 WORKOVER NABORS DRILLING CO. NABORS Start: 6/22/2006 Rig Release: 6/27/2006 Rig Number: 7es Spud Date: 1/25/1997 End: 6/27/2006 6/22/2006 00:00 - 01 :30 1.50 MOB P PRE Disconnect power between pits and sub base. Remove top drive from blocks. Bridal up. Lower cattle chute. 01 :30 - 02:00 0.50 MOB P PRE Lay down derrick. 02:00 - 04:30 2.50 MOB N WAIT PRE Wait on Peak equipment due to 4es rig move. 04:30 - 05:30 1.00 MOB P PRE Move mud pits away from sub base. 05:30 - 07:00 1.50 MOB P PRE Move sub base off well G-17 A, 07:00 - 12:00 5.00 MOB P PRE Install jeep under mud pits. Move camp, shop and mud pits to entrance of north extension of S pad, 12:00 - 16:00 4.00 MOB N WAIT PRE Wait on tool service to lay mats at the entrance for the north extension of S pad. 16:00 - 18:00 2.00 MOB P PRE Move camp and set on north extension of S pad. Spot pits. Set shop next to Kuskokwim camp, 18:00 - 00:00 6.00 MOB P PRE Move sub base from G pad to east kuparuk river bridge. 6/23/2006 00:00 - 06:00 6.00 MOB P PRE Continue to move sub base from the east kuparuk river bridge to S pad. 06:00 - 07:00 1,00 RIGU P PRE Spot and level sub base over well S-44. Rig acceptance backed up 4 hours due to time waiting on matting boards. Rig accepted at 06:00 hours 6-23-2006 07:00 - 10:00 3.00 RIGU P PRE Secure cellar, Set mats, Set mud pits in place, Hook up service lines, Rasie derrick and cattle chute, Bridal down, Connect top drive to blocks. 10:00 - 11 :00 1.00 KILL P DECOMP Rig up circulating lines, Prep rig floor. 11 :00 - 11 :30 0.50 WHSUR P DECOMP Rig up DSM lubricator and pull BPV, Rig down DSM lubricator. 11 :30 - 12:30 1.00 KILL P DECOMP Pressure test lines to 3500 psi. Circulate 50 bbls 8.5 ppg 120 degrees sea water down the 4 1/2" x 7" annulus taking returns up the 41/2" tubing out to the cuttings box at 4bpm at 330 psi. 12:30 - 15:00 2.50 KILL P DECOMP Switch lines and pump 50 bbl Safe Surf-O soap sweep followed by 120 degrees 8.5 ppg sea water down the 4 1/2" tubing taking returns up the 4 1/2" x 7" annulus out to the cuttings box at 4 bpm 290 psi. Recovered 75 bbls of freeze protect. Monitor well. Static 15:00 - 15:30 0.50 WHSUR P DECOMP Blow down lines, Install TWC and set from below to 1000 psi. 15:30 - 17:00 1.50 WHSUR P DECOMP Nipple down adapter flange and tree. Verify hanger threads 4 1/2" NSCT 6 1/2 turns by hand. Terminate control lines. Leaving tree in cellar. 17:00 - 19:00 2.00 BOPSU P DECOMP Nipple up BOP. 19:00 - 00:00 5,00 BOPSU P DECOMP Test BOP and associated valves to 250 psi low 3500 psi high with 4" test joint and 4 1/2" test joint to meet AOGCC requirments. BOP test witnessed by AOGCC rep Chuck Sheive, WSL Wade Frame, Nabors tool pusher Cris Weaver. Note: Unable to test lower pipe rams with 4" and 41/2" test joint due to height of hanger neck. 6/24/2006 00:00 - 00:30 0.50 BOPSU P DECOMP Rig down test equipment. 00:30 - 01 :30 1.00 WHSUR P DECOMP Rig up DSM lubricator and pull TWC, Rig down lubricator. 01 :30 - 02:30 1.00 PULL P DECOMP Pick up landing joint. BOLDS. Pull hanger to rig floor. Hanger came off seat at 130k, Up weight remained constant at 130k. Monitor well bore. Static. 02:30 - 03:00 0.50 PULL P DECOMP Terminate control lines. Break hanger. Lay down landing joint and hanger. 03:00 - 04:00 1.00 PULL P DECOMP Pre job safety meeting with all hands, Schlumberger concerning safe control line spooling procedure. Rig up casing tongs and Cameo spooling unit 04:00 - 11 :30 7.50 PULL P DECOMP Pull out of the hole laying down 41/2" 12.6# L-80 IBT tubing. Printed: 7/512006 10:11:57 AM e e Legal Well Name: Common Well Name: Event Name: Contractor Name: Rig Name: S-44 S-44 WORKOVER NABORS DRILLING CO. NABORS Start: Rig Release: Rig Number: 6/22/2006 6/27/2006 7es Spud Date: 1/25/1997 End: 6/27/2006 6/24/2006 04:00 - 11 :30 7.50 PULL P DECOMP Recovering 1 SSSV and 1 GLM, 56 SSCLB. 11 :30 - 12:00 0.50 PULL P DECOMP Rig down Schlumberger control line spooling unit. 12:00 - 16:30 4,50 PULL P DECOMP Pull out of the hole laying down 4 1/2" 12.6# L-80 IBT tubing. Sea water weight in 8.5 ppg. Out 8.5 ppg Recovering 218 full joints + a 21.16' cut off. End of cut joint flared to 5". 16:30 - 17:30 1.00 PULL P DECOMP Rig down casing equipment. Clear and clean floor. 17:30 - 18:00 0.50 BOPSU P DECOMP Rig up test equipment. Install test plug. 18:00 - 19:00 1.00 BOPSU P DECOMP Test bottom pipe rams with 4" and 4 1/2" test joint to 250 psi low 3500 psi high, Witnessed by WSL Wade Frame and Nabors Toolpusher Cris Weaver. 19:00 - 19:30 0.50 BOPSU P DECOMP Rig down test equipment. Pull test plug and set wear bushing 19:30 - 20:00 0.50 CLEAN P DECOMP Service top drive, 20:00 - 22:30 2.50 CLEAN P DECOMP Pick up BHA #1 consisting of a 6" OD dressing mill, 253/4" wash pipe extensions, 4 3/4" inner mill, boot basket, double pin sub, 7" casing scraper, bit sub, bumper sub, oil jar, pump out sub, 943/4" drill collars, cross over sub = 320.37'. 22:30 - 00:00 1.50 CLEAN P DECOMP Pick up 37 joints 4" HT-40 drill pipe from pipe shed. 6/25/2006 00:00 - 08:30 8.50 CLEAN P DECOMP Continue to pick up 4" HT-40 drill pipe from pipe shed to 9016' 08:30 - 10:00 1.50 CLEAN P DECOMP PJSM. Cut and slip of 116' drilling line, Inspect and adjust brakes, Hook up blower hose. 10:00 - 10:30 0.50 CLEAN P DECOMP Continue to pick up 4" HT-40 drill pipe from pipe shed to 9175", Picked up total of 279 joints of 4" HT-40 drill pipe. 10:30 - 11 :30 1.00 CLEAN P DECOMP Establish milling parameters prior to tagging 4 1/2" tubing stub. Up weight 175k. Slack off weight 160k. Rotating weight 165k. 40 rpm. Torque off 3 to 4k. Torque on bottom 4 to 7k, 200 gpm at 580 psi. Tag 4 1/2" tubing stub at 9191.5', Milled over 41/2" tubing stub 1 0' to 9201.5'. Dressing top of 4 1/2" tubing stub 2". Pull off 4 1/2" tubing stub and go back over 4 1/2" tubing stub with out rotation. Reconfrim top of 41/2" tubing stub at 9191.5' by washing over stub with pipe rotation. Check stub with and with out rotation, Pump Hi-Vis sweep, Allow sweep to clear BHA and pick up above 4 1/2" tubing stub, Sea water weight in 8.5 ppg. Out 8.5 ppg. 11 :30 - 12:30 1.00 CLEAN P DECOMP Circulate sweep out of the hole at 500 gpm 2000 psi. 12:30 - 15:30 3.00 CLEAN P DECOMP Pull out of the hole form 9171' to 2518'. 15:30 - 16:00 0.50 BOPSU P DECOMP PJSM. Make up and set Halliburton 7" storm packer 6' below tubing head. 16:00 - 17:00 1.00 BOPSU P DECOMP Pull wear bushing, Make up pack off retriving tool and pull 7" pack off, Install new 7" pack off, RILDS and test to 5000 psi for 10 minutes. Install wear bushing. 17:00 - 18:00 1.00 BOPSU P DECOMP Retrieve Halliburton storm packer and lay down. 18:00 - 19:00 1,00 CLEAN P DECOMP Pull out of the hole from 2518' to 320'. 19:00 - 20:00 1.00 CLEAN P DECOMP Stand back 4 3/4" drill collars, lay down pump out sub, oil jar, bumper sub,7" casing scraper, double pin sub, 5 3/4" boot basket, 4 3/4" inner mill, 25 3/4" wash pipe extensions, 6" dressing mill. 20:00 - 20:30 0.50 CLEAN P DECOMP Rig up 2 7/8" casing equipment. 20:30 - 22:30 2,00 CLEAN P DECOMP Pick up BHA #2 consiting of 3 5/8" reverse junk basket, bit sub, 43 1/8" pac drill collars, cross over sub, double pin sub, 2 4 3/4" boot basket, bit sub, bumper sub, oil jar, pump out sub, and run in the hole with 3 stands of 4 3/4" drill collars and cross over sub = 436.19'. 22:30 - 00:00 1.50 CLEAN P DECOMP Run in the hole from 436' to 2061' Printed: 7/512006 10:11:57 AM e e Legal Well Name: Common Well Name: Event Name: Contractor Name: Rig Name: S-44 S-44 WORKOVER NABORS DRILLING CO. NABORS Start: 6/22/2006 Rig Release: 6/27/2006 Rig Number: 7es Spud Date: 1/25/1997 End: 6/27/2006 6/26/2006 00:00 - 02:30 2.50 CLEAN P DECOMP Continue to run in the hole from 2061' to 9180'. 02:30 - 03:00 0.50 CLEAN P DECOMP Establish parameters prior to tagging 4 1/2" tubing stub. Up weight 175k. Slack off weight 165k. Rotating weight 165k. 10 rpm. Torque off 2 to 2.5k.Tag 41/2" tubing stub at 9191.5' DPM with 2k down weight. Work drill string twice in an attempt to pass thru 4 1/2" tubing each time setting 2k on top of 4 1/2" tubing stub. Set 1 k down weight on top of 4 1/2 tubing and rotate revese circulating basket into 4 1/2" tubing. 03:00 - 04:00 1.00 CLEAN P DECOMP Begin washing from 9191.5' to 9252' DPM with 10 rpm, 163 gpm 767 psi 2 to 3k on reverse circulating basket. At 9252' weight would not drill off, picked up to 9250' and wash down to 9252'. Observe a 200 psi pressure loss, shortly after that returns were lost, fill hole from the back side thur the kill line and continue to wash down to 9297' DPM. WLEG at 9293'. Sea water weight in 8.5 ppg In, Out 8.5 ppg. 04:00 - 04:30 0.50 CLEAN P DECOMP Prepare to lay down 4" HT-40 drill pipe while monitoring well bore. Static loss rate at 380 bbl/hr. 04:30 - 12:30 8.00 CLEAN P DECOMP Pull out of the hole laying down 279 joints of 4" HT-40 drill pipe. Static loss rate slowed to 300 bbl/hr. Total fluid lost while laying down drill pipe 1865 bbl of 8.5 ppg sea water 12:30 - 15:00 2.50 CLEAN P DECOMP Lay down BHA, cross over sub, 9 4 3/4" drill collars, pump out sub, oil jar, bumper sub, bit sub, 2 4 3/4" boot baskets, double pin sub, cross over, 431/8" pac drill collars, bit sub and 3 518" reverse circulating basket. 15:00 - 15:30 0.50 CLEAN DECOMP Service top drive and crown section. 15:30 - 16:00 0.50 BOPSU DECOMP Pull wear bushing and make dummy run with hanger. 16:00 - 16:30 0.50 RUNCO RUNCMP Rig up Nabors torque turn equipment and compensator, 16:30 - 18:00 1.50 RUNCO RUNCMP Pre job safety meeting with all hands Baker representative, Nabors casing hand, Nabors tool pusher and WSL. 18:00 - 00:00 6,00 RUNCMP Run in the hole with 4 1/2" 12.60# 13 Cr-80 Vam-Top tubing to 4560'. Baker-Loc all connections below Baker 7" x 41/2" S-3 packer. Optium torque 4400. Lost 4016 bbls of 8,5 ppg sea water to well bore. 6/27/2006 00:00 - 08:00 8.00 RUNCMP Run in the hole with 4 1/2" 12.60# 13 Cr-80 Vam-Top tubing to 9204', 08:00 - 10:00 2.00 RUNCMP Verified bottom out on 41/2" tubing stub with Unique Machine Overshot by shearing pins (4) on Unique Machine Overshot with 8k down weight. Pick up to netural weight + 3' to space out. Make up hanger and land the same. Run in lock down screws. Up weight 140k. Slack off weight 120k Ran a total of 213 joints of 41/2 13 Cr-80 Yam-Top tubing, Space out pups used 9.91',10.12' 10:00 - 11 :30 1.50 RUNCO P RUNCMP Rig up lines and reverse circulate 171 bbls of inhibited 8.5 ppg sea water at 200 psi. Did not have any returns while pumping inhibited sea water. 11 :30 - 14:30 3.00 RUNCO P RUNCMP Drop ball and rod allow to fall. Pressure up on tubing to 3500 psi to set Baker S-3 type packer. Record pressure on chart for 30 minutes. Bleed pressure tubing from 3500 psi to 1500 psi and shut in. Pressure up on the 4 1/2" x 7" annulus to 3500 psi and record pressure on chart for minutes. Bleed annulus pressure to 0 psi, then bleed tubing pressure to 0 psi. Pressure Printed: 7/5/2006 10:11:57 AM · , e Legal Well Name: Common Well Name: Event Name: Contractor Name: Rig Name: S-44 S-44 WORKOVER NABORS DRILLING CO, NABORS Start: 6/22/2006 Rig Release: 6/27/2006 Rig Number: 7es Spud Date: 1/25/1997 End: 6/27/2006 up on annulus and DCK valve. DCK valve sheared at 2700 psi. Pump 2 bbls 8.5 ppg sea water down the tubing at 90 gpm 630 psi. Pump 3 bbls 8.5 ppg sea water down the annulus at 90 gpm 630 psi to verify DCK valve sheared. 14:30 - 15:00 0.50 BOPSU P 15:00 - 15:30 0.50 RUNCO 15:30 - 16:30 1.00 BOPSU P 16:30 - 18:00 1.50 WHSUR P 18:00 - 19:00 1.00 WHSUR P 19:00 - 20:00 1.00 WHSUR P 20:00 - 21 :00 1.00 WHSUR P 21 :00 - 23:00 2.00 WHSUR P 23:00 - 23:30 0.50 WHSUR P 23:30 - 00:00 0.50 WHSUR P Total 8.5 ppg Sea water lost to RWO = 6300 bbls RUNCMP Install TWC in tubing hanger and test from below to 1000 psi. RUNCMP Rig down and blow down lines. RUNCMP Nipple down BOP and set back on stand. RUNCMP Nipple up Adapter flange and test to 5000 psi for 10 minutes. Nipple up tree and test to 5000 psi for 10 minutes. Record test pressure on chart. RUNCMP Rig up DSM lubricator and pull TWC. Rig down DSM lubricator. RUNCMP Pre job safety metting. Rig up hoses to freeze protect and test lines to 3000 psi. RUNCMP Reveres circulate pumping 75 bbls of 70 degrees diesel, using Lttle Red Hot Oil Services. Taking returns up the tubing out to the cuttings tank, RUNCMP Allow diesel to U- Tube. RUNCMP Install BPV and test from below to 1000 psi using Little Red Hot Oil Services. Rig down and blow down lines. RUNCMP Secure tree. Rig Released from S-44 at 23:59 hours on 6/27/2006. Printed: 7/512006 10:11:57 AM oN-oR BEFORE c:t,o~M-D°c PERMIT DATA AOGCC Individual Well Geological Materials Inventory T DATA PLUS Page: 1 Date: 05/24/99 T / RUN RECVD D BOX .............. 97-006 SRVY RPT -~/SCHLUM 0-13150 08/14/97 ~9~--006~--- - SRVY---RPT .............. R _SCH.LUM .... 0.-~12487 ................ 08/14/97 97 - 006 ~R5/GR-MD ~8947 - 13120 · 97-oo6 8311 ~ SCHLU~ S~ ~C~ DAILY WELL OPS ~' ~ ~/~;~ TO ~ ~. Are dry ditch samples required? yes ~~d received? Was the well cored? yes ~' ~alysis & description received? Are well tests required? yes ~o~ Received? ~- Well is in compliance ~% Initial C0~ENTS FINAL 02/12/98 T 1-4 02/12/98 · --- STATE OF ALASKA - ALASKA ...,L AND GAS CONSERVATION CO~v,,,.-,ISSlON REPORT OF SUNDRY WELL OPERATIONS !1. Operations performed: [--] Operation Shutdown []Stimulate [] Plugging [] Perforate I--I Pull Tubing [--IAIter Casing [] Repair Well [] Other 2. Name of Operator BP Exploration (Alaska)Inc. 3. Address P.O. Box 196612, Anchorage, Alaska 99519-6612 Type of well: [~] Development I--] Exploratory [] Stratigraphic []Service 4. Location of well at surface 4242' NSL, 4502' WEL, SEC. 35, T12N, R12E At top of productive interval 4564' NSL, 2082' WEL, SEC. 34, T12N, R12E At effective depth 4439' NSL, 4869' WEL, SEC. 27, T12N, R12E At total depth 856' NSL, 4888' WEL, SEC. 27, T12N, R12E 6. Datum Elevation (DF or KB) KBE = 67' 7. Unit or Property Name Prudhoe Bay Unit 8. Well Number S-44 9. Permit Number / Approval No. 97-06 10, APl Number 50-029-22735 1. Field and Pool Prudhoe Bay Field / Prudhoe Bay Pool 12. Present well condition summary Total depth: measured 13150 feet true vertical 8968 feet Effective depth: measured 13127 feet true vertical 8969 feet Casing Length Size Structural Conductor 110' 20" Surface 3099' 9-5/8" Intermediate 10173' 7" Production Liner 3191' 4-1/2" Plugs (measured) Junk (measured) Cemented MD TVD 260 sx Arctic Set (Approx) 1181 sx Coldset Ill, 430 sx Class 'G" 620 sx Class 'G' 130 sx Class 'G' 110' 110' 3130' 3130' 10204' 8946' 9939'-13130' 8901'-8969' Perforation depth: measured 10927'-13128' slottedliner true vertical 8988'-8969' Tubing (size, grade, and measured depth) 4-1/2", 12.6#, L-80 @ 9542'-9576' Packers and SSSV (type and measured depth) Packer @ 9542' SSSV @ (Nipple) 13. Stimulation or cement squeeze summary Intervals treated (measured) See Attachment Treatment description including volumes used and final pressure ORI61NAL 14. Prior to well operation: Subsequent to operation: 15. Attachments [] Copies of Logs and Surveys run [] Daily Report of Well Operat,~,ons [] Oil [] Gas [] Suspended 17. I hereby ce~tify.,Cnat th~ foreg6,1'n.q is true~nd/C~rrect to the best of my knowledge Sign ~=_c~/~~'c' " ' ~'' /~ A Title Technical Assistant III Representative Daily Average Production or Injection Data Oil-Bbl Gas-Mcf Water-Bbl SI Casing Pressure Tubing Pressure 16. Status of well classifications as: Service Prepared By Name/Numbec Submit In Duplicate~ Form 10-404 Rev. 06/15/88 S-44 DESCRIPTION OF WORK COMPLETED Stimulation Operation O9/23/97 A Scale Inhibitor Treatment was performed using the following fluids: SUMMARY S well and gas lift in. Pumped scale inhibitor, volumes shown below. Left well shutin until 0:00 am tonight. Fluids Pumped BBLS. Description 384 Filtered Seawater 67 Scale inhibitor, B34 10% solution in seawater 451 Total GeoQuest 500 W. International Airport Road Anchorage, AK 99518-1199 ATTN: Sherrie NO. 11803 Company: Alaska Oil & Gas Cons Comm Attn: Lori Taylor 3001 Porcupine Drive Anchorage, AK 99501 Field: Prudhoe Bay (Open Hole) LIS Well Job # Log Description Date BL RF Sepia Tape S-44 ~ '~')ll 97164 MWDGR&ARC5 970321 I I I 2/1 1/98 PLEASE ACKNOWLEDGE RECEIPT BY SIGNING AND RETURNING ONE COPY EACH TO: BP Exploration (Alaska) Inc. Petrotectnical Data Center MB3-3 900 E. Benson Blvd. Anchorage, Alaska 99519-6612 Date Delivered: Schlumberger GeoQuest 500 W. International Airport Road Anchorage, Alaska 99618-1199 Received b~~~ STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMMISSION WELL COMPLETION OR RECOMPLETION REPORT AND LOG 1. Status of Well Classification of Service Well [] Oil [] Gas [--I Suspended [] Abandoned [] Service :2. Name of Operator 7. Permit Number BP Exploration (Alaska)Inc. 97-06 3. Address 8. APl Number P.O. Box 196612, Anchorage, Alaska 99519-6612 50-029-22735 4. Location of well at surface ?'~;-.;..~-~-:'~..-... - ~ ' ~~ 9. Unit or Lease Name 4242' NSL, 4502' WEL, SEC. 35, T12N, R12E : , Prudhoe Bay Unit O'~'_//~_~ t I 10. Well Number At top of productive interval 4564' NSL, 2082' WEL, SEC. 34, T12N, R12E ! ~.'-~:,:..r; .'- ' S-44 At total depth i ~ ,t ..... ~ ~ 11 Field and Pool 856' NSL, 4888' WEL, SEC. 27, T12N, R12E ~~~.?.~ r . Prudhoe Bay Field / Prudhoe Bay 5. Elevation in feet (indicate KB, DF, etc.) 16. Lease Designation and Serial No. Pool KBE - 67'I ADL 028258 12. Date Spudded t 13. Date T.D. Reached I 14. Date Comp., Susp., or Aband.115. Water depth, if offshore 116. No. of Completions ~~ _,~/2/97 3/21/97 5/2/97 N/A MSLI One 17. Total Depth (MD+TVD),18. Plug Back Depth (MD+TVD)I19. Directional Survey 120. Depth where SSSV set 121. Thickness of Permafrost 13150 8968 FTI 13127 8969 FTI [~Yes ~--]No (Nipple) MD 1900' (Approx.) 22. Type Electric or Other Logs Run MWD, GR, LWD: DIP / FE / DD, RES 23. CASlNG~ LINER AND CEMENTING RECORD CASING SETTING DEPTH HOLE SIZE WT. PER FT. GRADE TOP BO-FrOM SIZE CEMENTING RECORD AMOUNT PULLED 20" 91.5# H-40 Surface 110' 30" 260 sx Arctic Set (Approx.) 9-5/8" 40# L-80 32' 3130' 12-1/4" 1181 sx Coldset Ill, 430 sx Class 'G' 7" 26# L-80 29' 10204' 8-1/2" 620 sx Class 'G' 4-1/2" 12.6# L-80 9939' 13130' 6" 130 sx Class 'G' 24. Perforations open to Production (MD+TVD of Top and 25. TUBING RECORD Bottom and interval, size and number) SizE DEPTH SET (MD) PACKER SET (MD) 4-1/2" Slotted Liner 4-1/2", 12.6#, L-80 9542' - 9576' 9542' MD TVD MD TVD 10927' - 13128' 8988' - 8969' 26. AC~D, FRACTURE, CEMENT SQUEEZE, ETC. DEPTH iNTERVAL (MD) AMOUNT & KIND OF MATERIAL USED Freeze Protect with 77 Bbls of Diesel 9514' Whipstock Obstruction 27. PRODUCTION TEST Date First Production I Method of Operation (Flowing, gas lift, etc.) May 24, 1997 I Gas Lift Date of Test Hours Tested PRODUCTION FOR OIL-BBL GAS-MCF WATER-BBL CHOKE SIZE I GAS-OIL RATIO TEST PERIOD I Flow Tubing Casing Pressure iCALCULATED OIL-BBL GAS-MCF WATER-BBL OIL GRAVITY-APl (CORR) Press. 24-HOUR RATE 28. CORE DATA Brief description of lithology, porosity, fractures, apparent dips and presence of oil, gas or water. Submit core chips. ORIGINAL Anchorags Form 10-407 Rev. 07-01-80 Submit In Duplicate 29. Geologic Markers 30. Formation Tests Measured True Vertical Include interval tested, pressure data, all fluids Marker Name Depth Depth recovered and gravity, GOR, and time of each phase. Sag River 9498' 8748' Shublik 9584' 8786' Top of Sadlerochit 9841' 8874' 31. List of Attachments Summary of Daily Drilling Reports, Surveys 32. I hereby certify that t.he foregoing is £rue. and cprrect to the best of my knowledge-i~/t ~l,z. Signed ~' , ..,,, ,::/ ~ /"-},,;~:' r'.-'~ ~/~-'~..2_] E~"--- Title Senior Drilling Engineer Date S-44 " 97-06 Prepared By Name/Number: Terrie Hubble, 564-4628 Well Number Permit No, / Approval No, INSTRUCTIONS GENERAL: This form is designed for submitting a complete and correct well completion report and log on all types of lands and leases in Alaska. ITEM 1.' Classification of Service Wells: Gas injection, water injection, steam injection, air injection, salt water disposal, water supply for injection, observation, injection for in-situ combustion. ITEM 5: Indicate which elevation is used as reference (where not otherwise shown) for depth measurements given in other spaces on this form and in any attachments. ITEM 16 AND 24: If this well is completed for separate production from more than one interval (multiple completion), so state in item 16, and in item 24 show the producing intervals for only the interval reported in item 27. Submit a separate form for each additional interval to be separately produced, showing the data pertinent to such interval. ITEM 21: Indicate whether from ground level (GL) or other elevation (DF, KB, etc.). ITEM 23: Attached supplemental records for this well should show the details of any multiple stage cementing and the location of the cementing tool. ITEM 27: Method of Operation: Flowing, Gas Lift, Rod Pump, Hydraulic Pump, Submersible, Water Injection, Gas Injection, Shut-In, Other-explain. ITEM 28: If no cores taken, indicate 'none'. Form 10-407 Rev. 07-01-80 Facility Date/Time 28 Feb 97 01 Mar 97 02 Mar 97 03 Mar 97 04 Mar 97 05 Mar 97 06 Mar 97 Progress Report PBS Pad Well S-44 Rig Nabors 18E Page 1 Date 09 July 97 06:00-10:00 10:00-17:00 17:00-02:00 02:00-06:00 06:00-07:00 07:00-16:00 16:00-19:30 19:30-06:00 06:00-12:00 12:00-16:30 16:30-19:00 19:00-20:00 20:00-21:00 21:00-22:30 22:30-06:00 06:00-12:00 12:00-12:30 12:30-14:00 14:00-14:30 14:30-15:00 15:00-00:30 00:30-01:00 01:00-01:30 01:30-06:00 06:00-08:00 08:00-09:30 09:30-10:30 10:30-11:30 11:30-13:00 13:00-14:00 14:00-15:30 15:30-22:00 22:00-01:00 01:00-03:00 03:00-06:00 06:00-07:30 07:30-09:30 09:30-14:30 14:30-20:00 20:00-00:00 00:00-01:30 01:30-02:00 02:00-04:30 04:30-05:00 05:00-06:00 06:00-07:00 07:00-10:30 10:30-11:00 11:00-11:30 11:30-12:30 12:30-13:00 13:00-13:30 13:30-17:00 17:00-17:30 Duration 4hr 7hr 9hr 4hr lhr 9hr 3-1/2 hr 10-1/2 hr 6hr 4-1/2 hr 2-1/2 hr lhr lhr 1-1/2 hr 7-1/2 hr 6hr 1/2 hr 1-1/2 hr 1/2 hr 1/2 hr 9-1/2 hr 1/2hr 1/2 hr 4-1/2 hr 2hr 1-1/2 hr lhr lhr 1-1/2 hr lhr 1-1/2 hr 6-1/2 hr 3hr 2hr 3hr 1-1/2 hr 2hr 5hr 5-1/2 hr 4hr 1-1/2 hr 1/2 hr 2-1/2 hr 1/2 hr lhr lhr 3-1/2 hr 1/2 hr 1/2 hr lhr 1/2hr 1/2 hr 3-1/2 hr 1/2 hr Activity Rigged down Drillfloor / Derrick Rigged down Drillfloor / Derrick Rigged down Drillfloor / Derrick Rig moved 40.00 % Rig moved 100.00 % (cont...) Rigged up Drillfloor / Derrick Rigged up Drillfloor / Derrick Rigged up Drillfloor / Derrick Rigged up Drillfloor / Derrick (cont...) Rigged up Divertor Made up BHA no. 1 Held safety meeting Tested Well control Repaired Drillfloor / Derrick Drilled to 650.00 ft Drilled to 650.00 ft (cont...) Repaired Rig services Drilled to 1300.00 ft Pulled out of hole to 250.00 ft R.I.H. to 1300.00 ft Drilled to 2388.00 ft Pulled out of hole to 1200.00 ft R.I.H. to 2388.00 ft Drilled to 2900.00 ft Drilled to 3145.00 ft (cont...) Circulated at 3145.00 ft Pulled out of hole to 660.00 ft R.I.H. to 3145.00 ft Circulated at 3145.00 ft Pulled out of hole to 660.00 ft Pulled BHA Ran Casing to 3130.00 ft (9-5/8in OD) Circulated at 3130.00 ft Mixed and pumped slurry - 129.000 bbl Circulated at 1772.00 ft Circulated at 1772.00 ft (cont...) Mixed and pumped slurry - 405.000 bbl Rigged down Divertor Rigged up BOP stack Tested BOP stack Made up BHA no. 2 Serviced Block line R.I.H. to 3000.00 ft Tested Casing - Via annulus and string Drilled cement to 3047.00 ft Drilled cement to 3145.00 ft (cont...) Circulated at 3145.00 ft Drilled to 3165.00 ft Circulated at 3165.00 ft Performed formation integrity test Circulated at 3165.00 ft Performed formation integrity test Drilled to 3576.00 ft Circulated at 3576.00 ft Facility Date/Time 07 Mar 97 08 Mar 97 09 Mar 97 10 Mar 97 11 Mar 97 12 Mar 97 13 Mar 97 14 Mar 97 PBS Pad Progress Report Well S-44 Rig Nabors 18E Page Date 17:30-18:00 Duration Activity 1/2 hr Pulled out of hole to 3130.00 ft 18:00-19:00 19:00-19:30 19:30-06:00 06:00-07:00 07:00-07:30 07:30-08:00 08:00-08:30 08:30-19:30 19:30-20:30 20:30-21:30 21:30-22:00 22:00-23:00 23:00-01:00 01:00-06:00 06:00-16:00 16:00-16:30 16:30-17:30 17:30-18:00 18:00-06:00 06:00-12:00 12:00-12:30 12:30-14:00 14:00-14:30 14:30-04:00 04:00-04:30 04:30-06:00 06:00-07:30 07:30-08:00 08:00-09:00 09:00-09:30 09:30-13:00 13:00-13:30 13:30-14:30 14:30-15:00 15:00-15:30 15:30-06:00 06:00-15:00 15:00-21:00 21:00-00:00 00:00-00:30 00:30-02:00 02:00-06:00 06:00-06:30 06:30-06:00 06:00-14:30 14:30-15:30 15:30-16:30 16:30-20:00 20:00-02:30 02:30-03:30 03:30-04:30 04:30-06:00 06:00-21:30 1 hr Performed formation integrity test 1/2 hr R.I.H. to 3576.00 ft 10-1/2 hr Drilled to 4503.00 ft 1 hr Drilled to 4575.00 ft (cont...) 1/2 hr Circulated at 4575.00 ft 1/2 hr Pulled out of hole to 3130.00 ft 1/2 hr R.I.H. to 3145.00 ft 11 hr Drilled to 5165.00 ft 1 hr Circulated at 5165.00 ft 1 hr Pulled out of hole to 218.00 ft 1/2 hr Pulled BHA 1 hr Made up BHA no. 3 2 hr R.I.H. to 5165.00 ft 5 hr Drilled to 5512.00 ft 10 hr Drilled to 6624.00 ft (cont...) 1/2 hr Circulated at 6624.00 ft 1 hr Pulled out of hole to 5100.00 ft 1/2 hr R.I.H. to 6624.00 ft 12 hr Drilled to 7650.00 ft 6 hr Drilled to 8000.00 ft (cont...) 1/2 hr Circulated at 8000.00 ft 1-1/2 hr Pulled out of hole to 6500.00 ft 1/2 hr R.I.H. to 8000.00 ft 13-1/2 hr Drilled to 8997.00 ft 1/2 hr Circulated at 8997.00 ft 1-1/2 hr Pulled out of hole to 6951.00 ft 1-1/2 hr Pulled out of hole to 204.00 ft (cont...) 1/2 hr Pulled BHA 1 hr Made up BHA no. 4 1/2 hr Serviced Brake 3-1/2 hr R.I.H. to 5361.00 ft 1/2 hr Held safety meeting 1 hr R.I.H. to 8997.00 ft 1/2 hr Drilled to 9014.00 ft 1/2 hr Serviced M.W.D. tool 14-1/2 hr Drilled to 9324.00 ft 9 hr Drilled to 9605.00 ft (cont...) 6 hr Circulated at 9605.00 ft 3 hr Pulled out of hole to 204.00 ft 1/2 hr Pulled BHA 1-1/2 hr Made up BHA no. 5 4 hr R.I.H. to 7062.00 ft 1/2 hr R.I.H. to 9605.00 ft 23-1/2 hr Drilled to 10012.00 ft 8-1/2 hr Drilled to 10214.00 ft 1 hr Circulated at 10214.00 ft 1 hr Pulled out of hole to 8329.00 ft 3-1/2 hr Circulated at 10214.00 ft 6-1/2 hr Pulled out of hole to 670.00 ft 1 hr Pulled BHA 1 hr Rigged up Top ram 1-1/2 hr Ran Casing to 200.00 ft (7in OD) 15-1/2 hr Ran Casing to 10203.00 ft (7in OD) 2 09 July 97 Facility Date/Time 15 Mar 97 16 Mar 97 17 Mar 97 18 Mar 97 19 Mar 97 20 Mar 97 21 Mar 97 22 Mar 97 PBS Pad Progress Report Well S-44 Page 3 Rig Nabors 18E Date 09 July 97 21:30-23:00 23:00-23:30 23:30-01:00 01:00-02:00 02:00-03:30 03:30-04:30 04:30-06:00 06:00-07:00 07:00-09:30 09:30-10:30 10:30-12:00 12:00-15:00 15:00-18:00 18:00-05:00 05:00-06:00 06:00-09:30 09:30-10:00 10:00-12:00 12:00-16:30 16:30-17:30 17:30-18:30 18:30-22:30 22:30-06:00 06:00-22:30 22:30-00:00 00:00-00:30 00:30-01:30 01:30-02:00 02:00-06:00 06:00-02:30 02:30-03:00 03:00-05:00 05:00-06:00 06:00-12:00 12:00-13:00 13:00-15:00 15:00-20:00 20:00-21:00 21:00-00:00 00:00-05:30 05:30-06:00 06:00-06:00 06:00-19:30 19:30-20:30 20:30-22:30 22:30-00:00 00:00-01:00 01:00-03:00 03:00-04:00 04:00-05:30 05:30-06:00 06:00-09:00 09:00-10:00 10:00-15:00 Duration 1-1/2 hr 1/2 hr 1-1/2 hr lhr 1-1/2 hr lhr 1-1/2 hr lhr 2-1/2 hr lhr 1-1/2 hr 3hr 3hr llhr 3-1/2 hr 1/2 hr 2hr 4-1/2 hr lhr lhr 4hr 7-1/2 hr 16-1/2 hr 1-1/2 hr 1/2 hr lhr 1/2 hr 4hr 20-1/2 hr 1/2 hr 2hr lhr 6hr lhr 2hr 5hr lhr 3hr 5-1/2 hr 1/2 hr 24 hr 13-1/2 hr lhr 2hr 1-1/2 hr lhr 2hr lhr 1-1/2 hr 1/2 hr 3hr lhr 5hr Activity Circulated at 10203.00 ft Held safety meeting Mixed and pumped slurry - 245.000 bbl Displaced slurry - 387.700 bbl Installed Seal assembly Circulated at 3130.00 ft Installed BOP stack Rigged down Kelly Repaired Block line Serviced Block line Rigged up Kelly Tested BOP stack Made up BHA no. 6 Singled in drill pipe to 9960.00 ft Tested Casing - Via string Drilled cement to 10214.00 ft Drilled to 10234.00 ft Circulated at 10234.00 ft Pulled out of hole to 220.00 ft Pulled BHA Made up BHA no. 7 R.I.H. to 10234.00 ft Drilled to 10470.00 ft Drilled to 11150.00 ft Circulated at 11150.00 ft Pulled out of hole to 10185.00 ft Circulated at 10185.00 ft R.I.H. to 11150.00 ft Drilled to 11217.00 ft Drilled to 11895.00 ft Circulated at 11850.00 ft Rest hole at 10895.00 ft Drilled to 11919.00 ft Drilled to 12023.00 ft ~); i~ Worked toolstring at 12023.00 ft ii':.':~ ,~ Circulated at 12023.00 fl . ' , .., Pulled out of hole to 260.00 ft .? Pulled BHA Made up BHA no. 8 /'~,:~$[c'4. .... 0il < ° R.I.H. to 12004.00 ft Drilled to 12053.00 fl Drilled to 12740.00 ft (cont...) Drilled to 13150.00 ft (cont...) Circulated at 13150.00 ft Pulled out of hole to 9570.00 ft Logged hole with LWD: DIR/FE/DD from 9577.00 ft to 9480.00 fl R.I.H. to 13150.00 ft Circulated at 13150.00 ft Pulled out of hole to 10200.00 ft Circulated at 10200.00 ft Pulled out of hole to 8000.00 ft Pulled out of hole to 250.00 fl (cont...) Pulled BHA Ran Liner to 3190.00 ft (4-1/2in OD) Facility Date/Time 23 Mar 97 24 Mar 97 25 Mar 97 26 Mar 97 27 Mar 97 28 Mar 97 29 Mar 97 PBS Pad Progress Report Well S-44 Page 4 Rig Nabors 18E Date 09 July 97 Duration Activity 15:00-15:30 15:30-22:30 22:30-23:30 23:30-01:00 01:00-02:30 02:30-03:30 03:30-04:30 04:30-06:00 06:00-09:00 09:00-11:30 11:30-12:00 12:00-14:00 14:00-18:00 18:00-23:30 23:30-01:00 01:00-01:30 01:30-03:00 03:00-04:30 04:30-05:00 05:00-06:00 06:00-12:00 12:00-13:00 13:00-16:00 16:00-19:30 19:30-00:30 00:30-06:00 06:00-06:30 06:30-08:30 08:30-09:00 09:00-10:00 10:00-11:30 11:30-15:30 15:30-17:00 17:00-01:30 01:30-03:30 03:30-06:00 06:00-06:15 06:15-07:00 07:00-08:00 08:00-10:00 10:00-13:30 13:30-14:30 14:30-06:00 06:00-13:30 13:30-15:00 15:00-17:00 17:00-18:00 18:00-21:30 21:30-22:30 22:30-00:00 00:00-03:00 03:00-06:00 06:00-06:00 06:00-08:00 1/2 hr 7hr lhr 1-1/2 hr 1-1/2 hr lhr lhr 1-1/2 hr 3hr 2-1/2 hr 1/2hr 2hr 4hr 5-1/2 hr 1-1/2 hr 1/2 hr 1-1/2 hr 1-1/2 hr 1/2 hr lhr 6hr lhr 3hr 3-1/2 hr 5hr 5-1/2 hr 1/2 hr 2hr 1/2 hr lhr 1-1/2 hr 4hr 1-1/2 hr 8-1/2 hr 2hr 2-1/2 hr 1/4 hr 3/4 hr lhr 2hr 3-1/2 hr lhr 15-1/2 hr 7-1/2 hr 1-1/2 hr 2hr lhr 3-1/2 hr lhr 1-1/2 hr 3hr 3hr 24 hr 2hr Circulated at 3190.00 ft Ran Liner on landing string to 13137.00 ft Circulated at 10926.00 ft Functioned Inflatable packer Circulated at 10875.00 ft Mixed and pumped slurry - 27.000 bbl Reverse circulated at 9945.00 ft Pulled Drillpipe in stands to 9000.00 ft Pulled Drillpipe in stands to 0.00 ft (cont...) Ran Drillpipe in stands to 2900.00 ft Serviced Block line Laid down 2900.00 ft of 3-1/2in OD drill pipe Tested BOP stack Made up BHA no. 9 R.I.H. to 7000.00 ft Held drill (Kick (well kill)) R.I.H. to 10760.00 ft Drilled cement to 10855.00 ft Tested Liner - Via annulus and string Drilled cement to 10875.00 ft Drilled cement to 10875.00 ft (cont...) R.I.H. to 13127.00 ft Circulated at 13127.00 ft Pulled out of hole to 3400.00 ft Pulled BHA Conduct braided cable operations - 5/16 size cable Conducted electric cable operations Made up BHA no. 1 R.I.H. to 1000.00 ft Functioned Survey instruments Pulled out of hole to 115.00 ft R.I.H. to 9496.00 ft Set tool face Cut Casing at 9506.00 ft Circulated at 9535.00 ft Pulled out of hole to 2000.00 ft Pulled out of hole to 400.00 ft (cont...) Pulled BHA Functioned BOP stack Made up BHA no. 11 R.I.H. to 9520.00 ft Set tool face Drilled to 9933.00 ft Drilled to 10172.00 ft (cont...) Took MWD survey at 9826.00 ft Drilled to 10190.00 ft Circulated at 10190.00 ft Pulled out of hole to 10190.00 ft Pulled BHA Made up BHA no. 12 R.I.H. to 10190.00 ft Drilled to 10250.00 ft Drilled to 10807.00 ft (cont...) Drilled to 10845.00 ft (cont...) Facility PBS Pad Progress Report Well S-44 Rig Nabors 18E Page 5 Date 09 July 97 Date/Time 30 Mar 97 31 Mar 97 01 Apr 97 02 Apr 97 03 Apr 97 04 Apr 97 08:00-10:30 10:30-14:30 14:30-15:30 15:30-16:30 16:30-18:00 18:00-21:30 21:30-00:00 00:00-06:00 06:00-13:30 13:30-14:30 14:30-18:00 18:00-20:30 20:30-22:30 22:30-03:30 03:30-04:30 04:30-06:00 06:00-08:00 08:00-09:30 09:30-10:00 10:00-10:30 10:30-15:00 15:00-15:30 15:30-17:30 17:30-06:00 06:00-16:00 16:00-18:30 18:30-22:00 22:00-23:00 23:00-01:00 01:00-04:30 04:30-05:00 05:00-06:00 06:00-06:30 06:30-10:00 10:00-11:00 11:00-11:30 11:30-17:00 17:00-18:00 18:00-19:00 19:00-20:00 20:00-21:00 21:00-06:00 06:00-23:00 23:00-00:00 00:00-01:30 01:30-02:00 02:00-03:00 03:00-03:30 03:30-06:00 06:00-13:00 13:00-13:30 13:30-14:00 14:00-16:00 16:00-23:00 Duration 2-1/2 hr 4hr lhr lhr 1-1/2 hr 3-1/2 hr 2-1/2 hr 6hr 7-1/2 hr lhr 3-1/2 hr 2-1/2 hr 2hr 5hr lhr 1-1/2 hr 2hr 1-1/2 hr 1/2 hr 1/2 hr 4-1/2 hr 1/2hr 2hr 12-1/2 hr 10hr 2-1/2 hr 3-1/2 hr lhr 2hr 3-1/2 hr 1/2 hr lhr 1/2hr 3-1/2 hr lhr 1/2 hr 5-1/2 hr lhr lhr lhr lhr 9hr 17 hr lhr 1-1/2 hr 1/2 hr lhr 1/2 hr 2-1/2 hr 7hr 1/2 hr 1/2 hr 2hr 7hr Activity Reamed to 10807.00 ft Pulled out of hole to 234.00 ft Pulled BHA Serviced Other sub-surface equipment Made up BHA no. 13 R.I.H. to 10324.00 ft Reamed to 10344.00 ft Drilled to 10350.00 ft Drilled to 10366.00 ft (cont...) Reamed to 10340.00 ft Reamed to 10366.00 ft Drilled to 10366.00 ft Circulated at 10413.00 ft Pulled out of hole to 220.00 ft Pulled BHA Tested BOP stack Tested BOP stack (cont...) Made up BHA no. 14 R.I.H. to 1000.00 ft Serviced Block line R.I.H. to 9485.00 ft Tested Kelly cocks R.I.H. to 10313.00 ft Drilled to 10674.00 ft Drilled to 11035.00 ft (cont...) Circulated at 11035.00 ft Pulled out of hole to 240.00 ft Pulled BHA Rigged up Kelly Made up BHA no. 15 R.I.H. to 1400.00 ft Pulled out of hole to 100.00 ft Pulled out of hole to 100.00 ft (cont...) R.I.H. to 10344.00 ft Washed to 10400.00 ft R.I.H. to 11035.00 ft Drilled to 11232.00 ft Circulated at 11232.00 ft Pulled out of hole to 9440.00 ft Flow check R.I.H. to 11232.00 ft Drilled to 11447.00 ft Drilled to 11848.00 ft Rest hole at 11848.00 ft Circulated at 11648.00 ft Pulled out of hole to 10800.00 ft Flow check R.I.H. to 11848.00 ft Drilled to 11921.00 ft Drilled to 12217.00 ft Rest hole at 12217.00 ft Drilled to 12220.00 ft Circulated at 12220.00 ft Pulled out of hole to 0.00 ft Facility Date/Time 05 Apr 97 06 Apr 97 07 Apr 97 08 Apr 97 09 Apr 97 10 Apr 97 11 Apr 97 PBS Pad Progress Report Well S-44 Rig Nabors 18E Page Date Duration Activity 23:00-00:30 00:30-04:00 04:00-05:00 05:00-06:00 06:00-06:30 06:30-07:30 07:30-10:00 10:00-16:00 16:00-04:30 04:30-06:00 06:00-07:30 07:30-09:00 09:00-10:00 10:00-14:30 14:30-20:30 20:30-22:30 22:30-02:30 02:30-06:00 06:00-08:30 08:30-11:30 11:30-12:00 12:00-13:00 13:00-13:30 13:30-14:00 14:00-17:30 17:30-18:30 18:30-21:00 21:00-00:00 00:00-03:30 06:00-08:00 08:00-08:30 08:30-10:00 10:00-12:00 12:00-16:00 16:00-02:00 02:00-04:30 04:30-06:00 06:00-12:00 12:00-20:00 20:00-23:00 23:00-00:00 00:00-00:30 00:30-02:30 02:30-03:00 03:00-06:00 06:00-10:30 10:30-12:30 12:30-00:00 00:00-06:00 06:00-10:30 10:30-13:00 13:00-14:00 14:00-15:00 15:00-17:30 1-1/2 hr 3-1/2 hr lhr lhr 1/2 hr lhr 2-1/2 hr 6hr 12-1/2 hr 1-1/2 hr 1-1/2 hr 1-1/2 hr lhr 4-1/2 hr 6hr 2hr 4hr 3-1/2 hr 2-1/2 hr 3hr 1/2hr lhr 1/2 hr 1/2 hr 3-1/2 hr lhr 2-1/2 hr 3hr 3-1/2 hr 2hr 1/2 hr 1-1/2 hr 2hr 4hr 10hr 2-1/2 hr 1-1/2 hr 6hr 8hr 3hr lhr 1/2 hr 2hr 1/2 hr 3hr 4-1/2 hr 2hr 11-1/2 hr 6hr 4-1/2 hr 2-1/2 hr lhr lhr 2-1/2 hr Pulled BHA Made up BHA no. 16 Pulled out of hole to 93.00 ft R.I.H. to 200.00 ft Serviced M.W.D. tool R.I.H. to 1000.00 ft Pulled out of hole to 90.00 ft R.I.H. to 12220.00 ft Drilled to 12486.00 ft Circulated at 12360.00 ft Circulated at 12385.00 ft Pulled out of hole to 9506.00 ft R.I.H. to 12385.00 ft Circulated at 12385.00 ft Pulled out of hole to 0.00 ft Pulled BHA Ran Liner to 2900.00 ft (4-1/2in OD) Ran Tubing to 2400.00 ft (2-1/16in OD) Ran Tubing to 2800.00 ft (2-1/16in OD) Ran Drillpipe on landing string to 9506.00 ft Circulated at 9506.00 ft Ran Liner in stands to 12373.00 ft Circulated at 12373.00 ft Set Liner hanger at 12373.00 ft with 20.0 psi Circulated at 12373.00 ft Pulled Drillpipe in stands to 9506.00 ft Circulated at 9506.00 ft Pulled Drillpipe in stands to 2800.00 ft Laid down 2800.00 ft of Tubing Made up BHA no. 17 Serviced Block line R.I.H. to 9476.00 ft Set tool face Fished at 9516.00 ft Jarred stuck pipe at 9516.00 ft Conducted electric cable operations Fished at 9516.00 ft Fished at 9516.00 ft (cont...) Conducted electric cable operations Pulled out of hole to 635.00 ft Pulled BHA Serviced Other sub-surface equipment Made up BHA no. 18 Serviced Block line R.I.H. to 9477.00 ft Jarred stuck pipe at 9516.00 ft Rig waited: Equipment Conducted electric cable operations Conducted electric cable operations Conducted electric cable operations Pulled out of hole to 636.00 ft Pulled BHA Made up BHA no. 19 R.I.H. to 9466.00 ft 6 09 July 97 Facility Date/Time 12 Apr 97 13 Apr 97 14 Apr 97 15 Apr 97 16 Apr 97 · _m Progress Report PBS Pad Well S-44 Rig Nabors 18E Page 7 Date 09 July 97 17:30-23:30 23:30-02:30 02:30-03:30 03:30-04:30 04:30-06:00 06:00-08:30 08:30-16:30 16:30-19:30 19:30-20:00 20:00-21:30 21:30-00:30 00:30-01:00 01:00-05:00 05:00-06:00 06:00-09:30 09:30-13:00 13:00-14:00 14:00-17:00 17:00-17:30 17:30-21:30 21:30-22:00 22:00-23:00 23:00-01:30 01:30-02:30 02:30-04:30 04:30-06:00 06:00-14:00 14:00-19:00 19:00-22:30 22:30-03:30 03:30-06:00 06:00-07:00 07:00-07:30 07:30-08:00 08:00-09:00 09:00-11:00 11:00-11:30 11:30-12:30 12:30-13:30 13:30-19:30 19:30-22:30 22:30-23:00 23:00-23:30 23:30-02:30 02:30-05:30 05:30-06:00 06:00-09:30 09:30-10:00 10:00-12:00 12:00-15:00 15:00-17:00 17:00-20:30 20:30-21:00 21:00-21:30 Duration 6hr 3hr lhr lhr 1-1/2 hr 2-1/2 hr 8hr 3hr 1/2 hr 1-1/2 hr 3hr 1/2 hr 4hr lhr 3-1/2 hr 3-1/2 hr lhr 3hr 1/2hr 4hr 1/2 hr lhr 2-1/2 hr lhr 2hr 1-1/2 hr 8hr 5hr 3-1/2 hr 5hr 2-1/2 hr lhr 1/2 hr 1/2 hr lhr 2hr 1/2hr lhr lhr 6hr 3hr 1/2 hr 1/2 hr 3hr 3hr 1/2 hr 3-1/2 hr 1/2 hr 2hr 3hr 2hr 3-1/2 hr 1/2 hr 1/2 hr Activity Washed over string at 9505.00 ft Pulled out of hole to 634.00 ft Pulled BHA Made up BHA no. 20 R.I.H. to 5000.00 ft R.I.H. to 9481.00 ft Washed over string at 9515.00 ft Pulled out of hole to 850.00 ft Pulled BHA Made up BHA no. 21 R.I.H. to 9481.00 ft Jarred stuck pipe at 9481.00 ft Pulled out of hole to 60.00 ft Laid down fish R.I.H. to 9508.00 ft Pulled out of hole to 60.00 ft Pulled BHA R.I.H. to 9508.00 ft Fished at 9508.00 ft Pulled out of hole to 60.00 ft Pulled BHA Made up BHA no. 23 R.I.H. to 3000.00 ft Serviced Block line R.I.H. to 9508.00 ft Fished at 9508.00 ft Circulated at 9508.00 ft Conducted electric cable operations Filter Seawater Conducted electric cable operations Pulled out of hole to 4000.00 ft Pulled out of hole to 60.00 ft (cont...) Pulled BHA Serviced Drillfloor / Derrick Made up BHA no. 24 R.I.H. to 6000.00 ft Held safety meeting R.I.H. to 9506.00 ft Circulated at 9506.00 ft Milled Downhole tools at 9509.00 ft Pulled out of hole to 60.00 ft Pulled BHA Made up BHA no. 25 R.I.H. to 9506.00 ft Milled Downhole tools at 9509.00 ft Circulated at 9506.00 ft Pulled out of hole to 851.00 ft Pulled BHA Made up BHA no. 26 R.I.H. to 9510.00 ft Fished at 9510.00 ft Pulled out of hole to 847.00 ft Pulled BHA Made up BHA no. 27 Facility Date/Time 17 Apr 97 18 Apr 97 19 Apr 97 20 Apr 97 21 Apr 97 22 Apr 97 PBS Pad Progress Report Well S-44 Rig Nabors 18E Page 8 Date 09 July 97 21:30-02:30 02:30-05:30 05:30-06:00 06:00-14:00 14:00-16:30 16:30-17:00 17:00-17:15 17:15-19:30 19:30-06:00 06:00-08:30 08:30-11:30 11:30-11:45 11:45-12:00 12:00-14:00 14:00-15:00 15:00-15:30 15:30-22:30 22:30-02:30 02:30-03:00 03:00-04:00 04:00-06:00 06:00-06:30 06:30-09:00 09:00-09:30 09:30-10:00 10:00-14:30 14:30-23:30 23:30-02:00 02:00-03:00 03:00-04:00 04:00-06:00 06:00-06:30 06:30-18:00 18:00-20:30 20:30-20:45 20:45-21:00 21:00-23:00 23:00-00:30 00:30-01:30 01:30-03:30 03:30-06:00 06:00-06:30 06:30-07:00 07:00-07:30 07:30-10:30 10:30-11:00 11:00-14:30 14:30-15:00 15:00-16:00 16:00-21:30 21:30-01:00 01:00-02:30 02:30-05:00 05:00-06:00 Duration 5hr 3hr 1/2 hr 8hr 2-1/2 hr 1/2 hr 1/4 hr 2-1/4 hr 10-1/2 hr 2-1/2 hr 3hr 1/4 hr 1/4 hr 2hr lhr 1/2 hr 7hr 4hr 1/2 hr lhr 2hr 1/2hr 2-1/2 hr 1/2 hr 1/2 hr 4-1/2 hr 9hr 2-1/2 hr lhr lhr 2hr 1/2 hr 11-1/2 hr 2-1/2 hr 1/4 hr 1/4 hr 2hr 1-1/2 hr lhr 2hr 2-1/2 hr 1/2 hr 1/2 hr 1/2hr 3hr 1/2 hr 3-1/2 hr 1/2 hr lhr 5-1/2 hr 3-1/2 hr 1-1/2 hr 2-1/2 hr lhr Activity Tested BOP stack R.I.H. to 9482.00 ft Milled Downhole tools at 9509.00 ft Milled Downhole tools at 9509.50 ft (cont...) Pulled out of hole to 860.00 ft Pulled BHA Made up BHA no. 28 R.I.H. to 9484.00 ft Milled Downhole tools at 9511.00 ft Milled Downhole tools at 9511.00 ft (cont...) Pulled out of hole to 300.00 ft Pulled BHA Made up BHA no. 29 R.I.H. to 7000.00 ft Serviced Block line R.I.H. to 9509.00 ft Milled Downhole tools at 9512.00 ft Pulled out of hole to 800.00 ft Pulled BHA Made up BHA no. 30 R.I.H. to 9473.00 ft Fished at 9506.00 ft Pulled out of hole to 300.00 ft Pulled BHA Removed Handling equipment Made up BHA no. 31 Milled Downhole tools at 9511.00 ft Pulled out of hole to 250.00 ft Pulled BHA Made up BHA no. 31 R.I.H. to 9480.00 ft R.I.H. to 9480.00 fl (cont...) Milled Downhole tools at 9518.00 ft Pulled out of hole to 300.00 fl Pulled BHA Made up BHA no. 32 R.I.H. to 9487.00 ft Reamed to 9518.00 fl Milled Downhole tools at 9524.00 ft Circulated at 9524.00 ft Pulled out of hole to 300.00 fl Pulled BHA Serviced Other sub-surface equipment Made up BHA no. 34 R.I.H. to 9498.00 ft Fished at 9510.00 ft Pulled out of hole to 300.00 fl Pulled BHA Serviced Block line Made up BHA no. 35 R.I.H. to 9452.00 ft Fished at 9509.00 ft Pulled out of hole to 300.00 ft Pulled BHA Facility Date/Time 23 Apr 97 24 Apr 97 25 Apr 97 26 Apr 97 27 Apr 97 28 Apr 97 Progress Report PBS Pad Well S-44 Page 9 Rig Nabors 18E Date 09 July 97 06:00-07:00 07:00-09:30 09:30-14:00 14:00-14:30 14:30-17:30 17:30-18:30 18:30-23:00 23:00-00:00 00:00-02:30 02:30-06:00 06:00-16:00 16:00-19:00 19:00-19:30 19:30-20:30 20:30-23:00 23:00-23:30 23:30-00:00 00:00-00:30 00:30-02:30 02:30-06:00 06:00-19:30 19:30-22:30 22:30-23:00 23:00-02:00 02:00-06:00 06:00-09:30 09:30-10:30 10:30-15:00 15:00-20:30 20:30-23:00 23:00-00:00 00:00-06:00 06:00-06:30 06:30-07:00 07:00-10:00 10:00-11:00 11:00-12:00 12:00-22:30 22:30-23:00 23:00-02:30 02:30-06:00 06:00-09:00 09:00-12:30 12:30-13:00 13:00-13:30 13:30-14:00 14:00-16:00 16:00-02:30 02:30-03:30 03:30-06:00 06:00-06:15 06:15-06:30 06:30-07:00 07:00-09:30 Duration lhr 2-1/2 hr 4-1/2 hr 1/2 hr 3hr lhr 4-1/2 hr lhr 2-1/2 hr 3-1/2 hr 10hr 3hr 1/2 hr lhr 2-1/2 hr 1/2 hr l/2hr 1/2 hr 2hr 3-1/2 hr 13-1/2 hr 3hr 1/2 hr 3hr 4hr 3-1/2 hr lhr 4-1/2 hr 5-1/2 hr 2-1/2 hr lhr 6hr 1/2 hr 1/2 hr 3hr lhr lhr 10-1/2 hr 1/2 hr 3-1/2 hr 3-1/2 hr 3hr 3-1/2 hr 1/2 hr 1/2 hr 1/2 hr 2hr 10-1/2 hr lhr 2-1/2 hr 1/4 hr 1/4 hr l/2hr 2-1/2 hr Activity Made up BHA no. 36 R.I.H. to 9511.00 ft Milled Other sub-surface equipment at 9513.00 ft Circulated at 9512.00 ft Pulled out of hole to 300.00 ft Pulled BHA Rig waited: Equipment Made up BHA no. 37 R.I.H. to 9505.00 ft Milled Other sub-surface equipment at 9508.00 ft Milled Other sub-surface equipment at 9510.50 ft (cont...) Pulled out of hole to 300.00 ft Pulled BHA Removed Bore protector Tested BOP stack Made up BHA no. 38 R.I.H. to 800.00 ft Tested Mud motor - Via string R.I.H. to 9484.00 ft Milled Downhole tools at 9513.00 ft Milled Downhole tools at 9512.00 ft (cont...) Pulled out of hole to 300.00 ft Pulled BHA R.I.H. to 9520.00 ft Filter Seawater Filter Seawater (cont...) Rigged up Logging/braided cable equipment Operate camera - 2in ID Conducted slickline operations on Slickline equipment - Tool run Operate camera - 2in ID Circulated at 9400.00 ft Operate camera - 2in ID Operate camera - 2in ID (cont...) Conducted electric cable operations Pulled out of hole to 0.00 ft Made up BHA no. 39 Serviced Bore protector Rig waited: Equipment Made up BHA no. 39 R.I.H. to 9503.00 ft Milled Downhole tools at 9505.00 ft Milled Downhole tools at 9505.40 ft (cont...) Pulled out of hole to 0.00 ft Pulled BHA Made up BHA no. 40 Serviced Block line R.I.H. to 9507.00 ft Milled Downhole tools at 9511.00 ft Circulated at 9511.00 ft Pulled out of hole to 300.00 ft Pulled out of hole to 300.00 ft (cont...) Pulled BHA Made up BHA no. 41 R.I.H. to 9510.00 ft Facility Date/Time 29 Apr 97 30 Apr 97 01 May 97 02 May 97 Progress Report PBS Pad Well S-44 Rig Nabors 1SE Page 10 Date 09 July 97 09:30-10:30 10:30-16:30 16:30-17:30 17:30-19:45 19:45-20:00 20:00-20:30 20:30-23:00 23:00-06:00 06:00-08:30 08:30-09:30 09:30-12:00 12:00-12:15 12:15-12:30 12:30-15:30 15:30-05:00 05:00-06:00 06:00-08:00 08:00-08:30 08:30-10:00 10:00-10:30 10:30-14:30 14:30-15:00 15:00-18:30 18:30-20:00 20:00-20:30 20:30-22:30 22:30-02:30 02:30-05:30 05:30-06:00 06:00-07:00 07:00-09:30 09:30-10:00 10:00-11:00 11:00-12:30 12:30-13:00 13:00-13:30 13:30-01:00 01:00-02:00 02:00-02:30 02:30-03:00 03:00-03:30 03:30-04:00 04:00-05:00 05:00-06:00 06:00-07:00 07:00-10:00 10:00-10:30 10:30-11:30 11:30-16:00 16:00-17:00 Duration lhr 6hr lhr 2-1/4 hr 1/4 hr 1/2 hr 2-1/2 hr 7hr 2-1/2 hr lhr 2-1/2 hr 1/4 hr 1/4 hr 3hr 13-1/2 hr lhr 2hr 1/2 hr 1-1/2 hr 1/2 hr 4hr 1/2 hr 3-1/2 hr 1-1/2 hr 1/2 hr 2hr 4hr 3hr 1/2 hr lhr 2-1/2 hr 1/2 hr lhr 1-1/2 hr 1/2 hr 1/2 hr 11-1/2 hr lhr 1/2 hr 1/2 hr 1/2 hr 1/2 hr lhr lhr lhr 3hr 1/2 hr lhr 4-1/2 hr lhr Activity Milled Downhole tools at 9511.00 ft Milled Downhole tools at 9512.00 ft Circulated at 9512.00 ft Pulled out of hole to 300.00 ft Pulled BHA Made up BHA no. 42 R.I.H. to 9512.00 ft Milled Downhole tools at 9513.50 ft Milled Downhole tools at 9513.80 ft (cont...) Circulated at 9512.00 ft Pulled out of hole to 300.00 ft Pulled BHA Made up BHA no. 43 R.I.H. to 9512.00 ft Milled Downhole tools at 9514.00 ft Circulated at 9514.00 ft Pulled out of hole to 798.00 ft Pulled BHA Rig waited: Orders Made up BHA no. 44 R.I.H. to 9512.00 ft Fished at 9514.00 ft Pulled out of hole to 772.00 ft Pulled BHA Made up BHA no. 45 R.I.H. to 9505.00 ft Circulated at 9505.00 ft Pulled out of hole to 0.00 ft Rigged down Kelly Rigged down Kelly (cont...) Laid down 4357.00 ft of 3-1/2in OD drill pipe Serviced Block line Laid down 1443.00 ft of 3-1/2in OD drill pipe Rigged up Top ram Installed Tubing handling equipment Held safety meeting Ran Tubing to 9292.85 ft (4-1/2in OD) Reverse circulated at 9292.85 ft Set packer at 9235.85 ft with 4000.0 psi Tested Tubing Tested Permanent packer Installed Hanger plug Rigged up Pipe ram Removed BOP stack Removed BOP stack (cont...) Installed Xmas tree Tested Xmas tree Removed Hanger plug Freeze protect well - 77.000 bbl of Diesel Rigged up Hanger plug Operator BP Exploration Performance Enquiry Report Date 15:40, 13 Aug 97 Page 1 The analysis is from - 12:30, 06 Mar 97 - to - 19:00, 06 Mar 97 Programs in Result Table: S-44 Multi Lateral Well Type Time From Time To S-44 Event 12:30, 06 Mar 97 12:30, 06 Mar 97 S-44 Event 13:30, 06 Mar 97 13:30, 06 Mar 97 S-44 Event 19:00, 06 Mar 97 19:00, 06 Mar 97 Duration 0 hr 0 min 0 hr 0 min 0 hr 0 min Description Obtained leak off Obtained leak off Obtained leak off E.M.W.(equivalent mud weight) 14.300 14.300 14.300 Hole Size MDR 8-1/2 8-1/2 8-1/2 ANADRILL Survey Report ORIGINAL Client Field BP Exploration Prudhoe Bay Well AFE Number Job Number Rig County State S-44 4P0855 39498 Nabors 18E North Slope Alaska Spud Date Engineer 3-Mar-97 Craig Brown Survey Calculation Calc. method for positions: Calc. method for DLS: Minimum curvature Mason & Taylor Depth References Permanent datum: Depth reference: GL above permanent datum: KB above permanent datum: DF above permanent datum: Mean Sea Level RKB 36.5ft 67.0 ft 65.5 ft Vertical Section Origin Latitude (+N/S-) 0.00 Departure (+E/W-) 0.00 Geomagnetic Data Magnetic Model: Magnetic Date: Magnetic Field Strength: Magnetic Dec (+E/W-) Magnetic Dip: BGGM 1996 version 2-Mar-97 1145.0 HCNT 28.37 degrees 80.71 degrees MVVD Survey Criteria Reference G: Reference H: Reference Dip: Tolerance of G: Tolerance of H: Tolerance of Dip: 1002.70 milliG 1145.00 HCNT 80.71 degrees (+/-) 3.00 milliG (+/-) 7.00 HCNT (+/-) 0.30 degrees Platform Reference Point Latitude (+N/S-) 0.00 Departure (+E/W-) 0.00 Target Azimuth from rotary table: 318.45 ' degrees Correction Magnetic Dec (+E/W-) 28.37 degrees Survey Measured Incl Azimuth Course TVD Vertical # Depth angle angle length depth section (ft) (deg) (deg) (ft) (ft) (ft) Displacement Closure DLS +N/S- +E/W- displ azim (degl (ft) (ft) (ft) (deg) 100f) Srvy tool type 1 0.00 0.00 0.00 0.00 0.00 0.00 2 159.00 0.21 32.30 159.00 159.00 0.08 3 261.06 0.13 355.90 102.10 261.10 0.23 4 352.48 0.27 22.00 91.40 352.50 0.40 5 443.04 0.25 324.50 90.50 443.00 0.69 0.00 0.00 0.00 0.00 0.00 TIP 0.25 0.16 0.29 32.30 0.13 MWD 0.52 0.25 0.58 25.44 0.13 MWD 0.82 0.32 0.88 21.29 0.18 MWD 1.18 0.29 1.22 13.60 0.28 MWD 6 534.54 0.47 7 626.31 0.51 8 719.48 0.72 9 808.25 0.69 10 902.46 0.85 337.20 3.70 7.30 0.10 22.40 91.50 91.80 93.20 88.70 94.30 534.50 1.25 1.69 0.02 .1.69 0.83 0.25 MWD 626.29 1.89 2.44 -0.10 2.45 357.77 0.25 MWD 719.49 2.57 3.44 0.01 3.44 0.10 0.23 MWD 808.18 3.34 4.53 0.08 4.53 0.99 0.11 MWD 902.47 4.07 5.74 0.35 5.75 3.44 0.36 MWD Page I Survey # 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 3O 31 32 33 34 35 36 37 38 39 40 41 42 43 44 45 46 47 48 49 5O Measured Incl Azimuth Course Depth angle angle length (ft) (deg) (deg) (ft) 991.64 1.10 12.70 89.10 1084.38 1.16 21.20 92.80 1177.21 1.28 15.00 92.80 1273.96 0.93 303.10 96.80 1367.60 0.86 287.80 93.60 1462.41 1557.57 1649.62 1743.27 1836.09 0.91 294.90 94.80 0.87 286.50 95.20 0.95 282.60 92.00 1.56 217.10 93.70 1.63 215.70 92.80 1927.84 2020.30 2114.20 2207.58 2300.19 1.57 215.90 91.70 1.57 213.1.0 92.50 1.41 218.20 93.90 1.05 186.90 93.40 1.03 192.90 92.60 2394.29 2487.45 2581.19 2678.35 2770.30 0.65 152.10 94.10 0.69 131.20 93.20 0.57 128.70 93.70 0.58 t41.00 97.10 0.47 128.90 92.00 2865.89 2958.55 3051.49 3089.46 . 3234.50 0.32 128.10 95.60 0.27 131.30 92.60 0.15 169.00 93.00 0.27 171.20 38.00 0.27 191.80 145.00 3328.68 0.17 199.60 94.20 3420.70 0.03 192.80 92.00 3514.24 0.04 285.70 93.50 3608.09 0.20 95.40 93.90 3704.20 0.56 122.40 96.10 3798.73 3891.42 3979.79 4078.66 4170.97 0.51 125.90 94.50 0.50 124.90 92.70 0.69 114.40 88.40 0.71 126.30 98.90 1.22 299.60 92.30 4263.78 4.02 295.50 92.80 4356.02 7.07 291.40 92.20 4451.60 10.10 287.00 95.60 4544.88 12.43 286.90 93.30 4639.21 14.36 283.30 94.30 51 4733.06 16.02 283.50 93.90 52 4828.36 17.77 282.60 95.30 53 4921.48 19.34 277.90 93.10 54 5015.00 21.91 275.80 93.50 55 5109.28 24.70 274.40 94.30 TVD Vertical depth section (ft) (ft) Displacement +N/S- +E/W- (ft) (ft) Closure displ azim (ft) (deg) 991.56 4.86 7.19 0.79 7.23 6.24 1084.34 5.81 8.93 1.32 9.03 8.41 1177.12 6.81 10.81 1.93 10.98 10.12 1273.91 8.16 12.28 1.55 12.38 7.20 1367.49 9.50 12.91 0.25 12.91 1.09 DLS (deg/ 100f) 0.34 0.19 0.19 1.37 0.27 1462.28 10.80 13.45 -1.11 13.49 355.26 0.13 1557.47 12.11 13.97 -2.49 14.19 349.88 0.14 1649.46 13.32 14.33 -3.91 14.86 344.75 0.11 1743.14 13.70 13.49 -5.44 14.54 338.05 1.55 1835.90 13.16 11.41 -6.97 13.37 328.58 0.09 1927.57 12.60 9.33 -8.46 12.60 317.78 2020.03 11.99 7.24 -9.90 12.27 306.19 2113.90 11.44 5.26 -11.32 12.48 294.91 2207.28 10.67 3.50 -12.13 12.63 286.11 2299.87 9.62 1.85 -12.42 12.56 278.47 2393.96 8.61 0.55 -12.36 12.37 272.57 2487.15 7.54 -0.28 -11.69 11.69 268.61 2580.84 6.52 -0.95 -10.90 10.94 265.04 2677.94 5.55 -1.63 -10.21 10.34 260.93 2769.94 4.72 -2.23 -9.63 9.88 256.96 9.49 253.84 9.23 251.40 9.14 249.45 9.16 248.60 9.45 244.84 2865.53 4.07 -2.64 -9.11 2958.13 3.60 -2.94 -8.74 3051.13 3.27 -3.21 -8.56 3089.13 3.16 -3.34 -8.53 3234.13 2.67 -4.02 -8.55 9.68 243.20 9.80 242.54 9.84 242.56 9.72 242.17 9.36 239.11 3328.33 2.47 -4.37 -8.64 3420.33 2.39 -4.52 -8.69 3513.83 2.40 -4.53 -8.73 3607.73 2.31 -4.54 -8.60 3703.83 1.73 -4.81 -8.04 9.03 234.03 8.80 228.98 8.53 223.21 8.34 215.13 8.46 217.89 3798.32 0.88 -5.30 -7.30 3891.02 0.08 -5.77 -6.64 3979.41 -0.78 -6.21 -5.84 4078.31 -1.92 -6.82 -4.80 4170.60 -1.55 -6.68 -5.20 0.07 0.08 0.22 0.80 0.12 0.73 0.26 0.13 0.13 0.17 0.16 0.06 0.19 0.32 0.07 0.11 0.15 0.05 0.26 0.41 0.06 0.01 0.25 0.15 2.09 4263.29 2.38 -4.79 -8.99 10.19 241.96 3.02 4355.05 10.41 -1.33 -17.19 17.24 265.59 3.33 4449.57 22.81 3.27 -30.69 30.86 276.09 3.24 4541.07 38.34 8.58 -48.12 48.88 280.11 2.50 4632.80 56.56 14.23 -69.22 70.66 281.61 2.23 4723.42 76.70 4814.60 99.27 4902.86 122.50 4990.36 147.10 19.93 -93.15 95.26 282.08 26.17 -120.13 122.95 282.29 31.39 -149.27 152.53 281.88 35.28 -181.97 185.35 280.97 38.57 -219.12 222.49 279.98 1.77 1.86 2.33 2.86 3.02 Srvy tool type MWD MWD MWD MWD MWD MWD MWD MWD MWD MWD MWD MWD MWD MWD MWD MWD MWD MWD MWD MWD MWD MWD MWD MWD MWD MWD MWD MWD MWD MWD MWD MWD MWD MWD MWD MWD MWD MWD MWD MWD MWD MWD MWD MWD MWD Survey Measured Incl Azimuth Course TVD Vertical Displacement Closure DLS Srvy # Depth angle angle length depth section +N/S- +E/W- displ azim (degl tool (ft) (deg) (deg) (ft) (ft) (ft) (ft) (ft) (ft) (deg) 100f) type 56 5202.71 26.91 273.90 93.40 5161.04 203.30 41.51 -259.67 262.97 279.08 2.38 MWD 57 5296.97 28.73 276.80 94.30 5244.44 235.44 45.64 -303.47 306.88 278.55 2.40 MWD 58 5389.68 29.04 276.80 92.70 5325.61 268.90 50.95 -347.93 351.64 278.33 0.33 MWD 59 5483.90 28.78 275.60 94.20 5408.07 302.61 55.87 -393.21 397.15 278.09 0.67 MWD 60 5578.71 28.84 274.00 94.80 5491.14 335.66 59.69 -438.73 442.77 277.75 0.82 MWD 61 5673.27 28.63 273.60 94.60 5574.09 368.02 62.70 -484.11 488.15 277.38 0.30 MWD 62 5766.89 29.86 274.10 93.60 5655.76 400.58 65.78 -529.73 533.80 277.08 1.34 MWD 63 5859.87 30.10 274.70 93.00 5736.32 433.98 69.34 -576.06 580.22 276.86 0.41 MWD 64 5956.79 29.75 274.90 96.90 5820.30 468.96 73.39 -624.23 628.53 276.71 0.38 MWD 65 6049.76 30.73 276.60 93.00 5900.64 503.38 78.09 -670.83 675.36 276,64 1.40 MWD 66 6145.47 30.61 277.10 95.70 5982.96 539.89 83.91 -719.30 724.17 276.65 0.29 MWD 67 6240.28 30.50 276.20 94.80 6064.59 575.81 89.49 -767.16 772.37 276.65 0.50 MWD 68 6332.38 30.39 278.70 92.10 6144.00 611.03 95.54 -813.43 819.02 276.70 1.38 MWD 69 6426.29 30.03 278.40 93.90 6225.14 647.27 102.57 -860.15 866.24 276.80 0.42 MWD 70 6521.62 29.38 277.10 95.30 6307.92 683.08 108.94 -906.94 913.46 276.85 0.96 MWD 71 6616.80 30.86 277.60 95.20 6390.26 719.08 115.05 -954.32 961.23 276.87 1.58 MWD 72 6711.27 29.11 276.10 94.50 6472.11 754.40 120.70 -1001.20 1008.45 276.87 2.01 MWD 73 6805.18 29.10 277.10 93.90 6554.16 788.42 125.95 -1046.57 1054.12 276.86 0.52 MWD 74 6897.33 29.57 277.50 92.10 6634.45 822.40 131.69 -1091.33 1099.24 276.88 0.55 MWD 75 6990.74 31.04 278.30 93.40 6715.08 858.21 138.17 -1138.01 1146.36 276.92 1.63 MWD 76 7083.89 30.39 276.80 93.20 6795.21 894.20 144.43 -1185.19 1193.96 276.95 1.08 MWD 77 7179.06 29.73 277.70 95.20 6877.60 930.07 150.45 -1232.50 1241.65 276.96 0.84 MWD 78 7271.91 31.26 279.90 92.80 6957.57 966.34 157.67 -1279.02 1288.71 277.03 2.04 MWD 79 7365.11 30.89 280.80 93.20 7037.39 1004.19 166.31 -1326.35 1336.73 277.15 0.64 MWD 80 7457.13 30.11 281.80 92.00 7116.66 1041.41 175.45 -1372.13 1383.31 277.29 1.01 MWD 81 7550.53 31.01 279.50 93.40 7197.09 1078.92 184.22 -1418.80 1430.71 277.40 1.58 MWD 82 7645.98 31.16 278.00 95.50 7278.88 1116.85 191.72 -1467.53 1480.00 277.44 0.83 MWD 83 7741.04 30.46 279.50 95.00 7360.47 1154.28 199.11 -1515.62 1528.64 277.48 1.09 MWD 84 7836.78 29.97 277.40 95.80 7443.26 1191.21 206.20 -1563.30 1576.84 277.51 1.22 MWD 85 7927.36 29.73 278.80 90.60 7521.84 1225.57 212.55 -1607.94 1621.93 277.53 0.81 MWD 86 8025.57 29.93 278.50 98.20 7607.03 1263.10 219.90 -1656.23 1670.77 277.56 0.25 MWD 87 8118.15 29.58 277.20 92.60 7687.42 1298.00 226.18 -1701.76 1716.72 277.57 0.79 MWD 88 8212.16 29.07 279.00 94.00 7769.38 1333.07 232.66 -1747.33 1762.75 277.58 1.08 MWD 89 8306.38 30.67 278.60 94.20 7851.06 1369.19 239.83 -1793.69 1809.65 277.62 1.71 MWD 90 8400.75 30.54 277.50 94.40 7932.31 1405.79 246.56 -1841.28 1857.71 277.63 0.61 MWD 91 8494.26 29.79 277.20 93.50 8013.15 1441.20 252.57 -1887.87 1904.69 277.62 0.82 MWD 92 8587.79 29.52 274.60 93.50 8094.41 1475.27 257.33 -1933.88 1950.92 277.58 1.41 MWD 93 8681.58 28.70 275.40 93.80 8176.36 1508.40 261.30 -1979.34 1996.51 277.52 0.97 MWD 94 8773.01 29.13 276.00 91.40 8256.36 1540.85 265.70 -2023.31 2040.68 277.48 0.57 MWD 95 8865.15 30.47 275.20 92.10 8336.28 1574.40 270.16 -2068.86 2086.43 277.44 1.52 MWD 96 8956.20 30.57 275.50 91.10 8414.76 1608.18 274.47 -2114.92 2132.66 277.39 0.20 MWD 97 9019.01 32.35 274.70 62.80 8468.33 1632.01 277.38 -2147.57 2165.41 277.36 2.91 MWD 98 9049.15 35.35 273.10 30.10 8493.32 1643.95 278.51 -2164.29 2182.14 277.33 10.40 MWD 99 9080.36 38.57 Z7Z.60 31.30 8518.33 1657,11 279.44 -2183.09 2200,90 277.29 10.33 MWD 100 9109.44 41.78 272.50 29.00 8540.49 1670.13 280.27 -2201.78 2219.54 277.25 11.07 MWD Page 3 -Survey # Measured Incl Azimuth Course Depth angle angle length (ft) (deg) (deg) (ft) 101 9142.93 45.65 272.60 33.50 102 9173.26 48.84 273.10 30.40 103 9204.47 51.98 273.80 31.20 104 9234.37 54.98 274.60 29.90 105 9267.74 58.15 274.90 33.30 106 9297.34 61.13 276.10 29.60 107 9329.43 63.00 277.10 32.10 108 9360.76 63.11 276.60 31.40 109 9391.87 63.19 277.60 31.10 110 9423.29 63.18 276.30 31.40 111 9453.59 63.09 275.90 30.30 112 9485.50 63.08 275.80 31.90 113 9517.39 63.29 277.80 31.90 114 9548.16 63.46 278.00 30.80 115 9589.37 64.09 277.50 41.20 116 9621.08 65.14 276.50 31.70 117 9653.68 67.22 274.30 32.60 118 9684.18 69.49 271.90 30.50 119 9715.31 71.28 269.70 31.10 120 9747.98 72.48 267.80 32.70 121 122 123 124 125 126 127 128 129 130 131 132 133 134 135 136 137 138 139 140 141 142 143 144 145 TVD Vertical depth section (ft) (ft) Displacement +N/S- +E/W- (ft) (ft) Closure displ azim (ft) (deg) 8564.69 1686.24 281.30 -2224.90 2242.61 277.21 8585.33 1701.85 282.41 -2247.19 2264.87 277.16 8605.21 1718.86 283.86 -2271.19 2288.86 277.12 8623.00 1736.07 285.63 -2295.15 2312.85 277.09 8641.35 1756.16 287.93 -2322.84 2340.61 277.07 8656.31 1774.85 290.38 -2348.26 2366.14 277.05 8671.34 1795.98 293.64 -2376.43 2394.50 277.04 8685.57 1816.91 296.98 -2404.22 2422.49 277.04 8699.62 1837.74 300.41 -2431.75 2450.24 277.04 8713.79 1858.73 303.80 -2459.57 2478.26 277.04 8727.48 1878.70 306.67 -2486.44 2505.29 277.03 8741.92 1899.64 309.57 -2514.74 2533.72 277.02 8756.31 1920.91 312.94 -2543.01 2562.19 277.02 8770.11 1941.83 316.73 -2570.28 2589.72 277.03 8788.32 1969.85 321.71 -2606.90 2626.68 277.04 8801.91 1991.32 325.20 -2635.33 2655.32 277.03 8815.08 2013.10 328.00 -2665.01 2685.12 277.02 8826.33 2033.02 329.53 -2693.32 2713.40 276.98 8836.77 2052.75 329.94 -2722.61 2742.53 276.91 8846.94 2072.85 329.26 -2753.68 2773.29 276.82 9779.45 73.02 265.40 31.50 8856.28 2091.43 327.47 -2783.70 2802.90 276.71 9810.54 73.37 263.80 31.00 8865.24 2108.94 324.68 -2813.25 2831.92 276.58 9841.71 74.04 264.50 31.20 8874.00 2126.41 321.63 -2843.04 2861.17 276.45 9873.88 74.31 265.10 32.20 8882.78 2144.77 318.82 -2873.89 2891.52 276.33 9905.56 74.14 263.70 31.70 8891.40 2162.68 315.84 -2904.25 2921.37 276.21 74.03 268.40 31.60 8900.07 2181.22 313.75 -2934.56 74.72 269.30 31.90 8908.66 2201.13 313.13 -2965.27 76.06 271.20 31.50 8916.60 2221.44 313.27 -2995.75 77.63 275.20 32.00 8923.89 2243.38 315.01 -3026.85 79.35 278.20 32.00 8930.28 2266.77 318.67 -3057.99 9937.17 9969.14 10000.62 10032.62 1OO64.57 80.80 281.80 31.60 8935.72 2291.14 324.08 -3088.64 82.96 284.90 31.80 8940.22 2316.90 331.35 -3119.26 85.46 287.30 32.00 8943.44 2343.79 340.18 -3149.84 87.23 289.70 24.50 8945.01 2364.97 347.93 -3173.03 87.90 293.00 33.00 8946.41 2394.32 359.94 -3203.73 10096.17 10127.98 10160.00 10184.50 10217.53 88.10 296.20 31.90 8947.52 2423.47 373.21 -3232.71 88.35 295.90 31.60 8948.50 2452.67 387.08 -3261.09 88.50 295.10 31.60 8949.37 2481.76 400.68 -3289.60 88.70 295.50 30.90 8950.12 2510.16 413.88 -3317.53 87.30 295.10 31.40 8951.22 2539.02 427.29 -3345.90 DLS Srvy (degl tool lOOf) type 11.55 MWD 10.56 MWD 10.21 MWD 10.26 MWD 9.55 MWD 10249.42 10281.04 10312.56 10343.49 10374.94 10.66 MWD 6.44 MWD 1.46 MWD 2.88 MWD 3.70 MWD 86.75 294.40 32.10 8952.88 2568.37 440.71 -3375.01 85.50 295.10 32.50 8955.08 2598.06 454.28 -3404,46 84.60 294.10 31.70 8957.82 2626.93 467.40 -3433.18 84.75 295.10 31.50 8960.74 2655.61 480.44 -3461.71 84.75 293.30 32.10 8963.68 2684.75 493.54 -3490.87 1.21 MWD 0.28 MWD 5.63 MWD 0.80 MWD 1.88 MWD 10406.97 10439.49 10471.15 10502.75 10534.82 4.37 MWD 8.88 MWD 10.43 MWD 8.80 MWD 6.63 MWD 7.48 MWD 5.07 MWD 3.04 MWD 1.98 MWD 4.28 MWD 2951.28 276.10 2981.76 276.03 3012.08 275.97 3043.20 275.94 3074.55 275.95 14.31 MWD 3.47 MWD 7.22 MWD 13.12 MWD 10.64 MWD 3105.59 275.99 12.12 MWD 3136.81 276.06 11.80 MWD 3168.16 276.16 10.80 MWD 3192.05 276.26 12.16 MWD 3223.89 276.41 10.20 MWD 3254.19 276.59 3283.98 276.77 3313.91 276.94 3343.25 277.11 3373.07 277.28 10.04 MWD 1.24 MWD 2.57 MWD 1.45 MWD 4.64 MWD 3403.66 277.44 2.77 MWD 3434.63 277.60 4.41 MWD 3464.85 277.75 4.47 MWD 3494.89 ~.~p~? 73;5~1~., ~ .,..,~/? ~.~! ~WD 3525.58 2;"/~8.b5~,-', :'-5:58~;' M~'VD Page 4 Sdrvey Measured Incl Azimuth Course TVD Vertical Displacement Closure DLS # Depth angle angle length depth section +N/S- +E/W- displ azim (deg/ (ft) (deg) (deg) (ft) (ft) (ft) (ft) (ft) (ft) (deg) 100f) ,.. .... 146- 10566.62 85.60 291,50 31,80 8966,35 2713,22 505,61 -3520,16 3556,29 278,17 6,24 147 10598,24 85.95 290.80 31,60 8968,68 2741,22 516,98 -3549.55 3587,00 278,29 2,47 148 10629,90 86,00 291.20 31.70 8970,91 2769,28 528.32 -3579,07 3617.86 278.40 1.27 149 10661.84 85.85 291.50 31.90 8973,17 2797,61 539,90 -3608,71 3648.87 278.51 1,05 150 10694,16 85,85 291,20 32,40 8975,52 2826,38 551.66 -3638,81 3680,39 278.62 0,92 151 152 153 154 155 10726.02 85,75 291,90 31,80 8977,85 2854,66 563.31 -3668,30 3711.30 278.73 2.22 10757.69 85,80 292,30 31.70 8980.18 2882,99 575,21 -3697,59 3742,07 278.84 1.27 10789.05 86.35 291,50 31,40 8982,33 2911,01 586,89 -3726,66 3772,59 278,95 3,09 10820,84 87.25 291.50 31,70 8984,10 2939,23 598,49 -3756,11 3803,49 279,05 2,84 10852.65 87.50 291,50 31.90 8985,56 2967,63 610,17 -3785,76 3834,61 279.16 0.78 156 10884,98 88.30 291,20 32.30 8986,75 2996,36 621,92 -3815.82 3866,17 279,26 2,64 157 10917.09 88.85 291,20 32.10 8987,54 3024,89 633,53 -3845.74 3897,57 279,35 1.71 158 10948,80 89,05 291,90 31,70 8988,13 3053,16 645.17 -3875,22 3928,56 279.45 2,30 159 10980,44 89,10 292,30 31,60 8988.63 3081,47 657,06 -3904.49 3959,39 279.55 1,28 160 11012.13 89.00 292,30 31,70 8989,16 3109,92 669,08 -3933,82 3990,31 279.65 0,32 161 11043.95 88.90 292,60 31,80 8989,74 3138,50 681,22 -3963,20 4021,32 279,75 0.99 162 11075.76 88,95 292,60 31,90 8990,34 3167,20 693,48 -3992,65 4052,42 279.85 0,16 163 11106.11 88.85 293,70 30.30 8990.92 3194,59 705,39 -4020.50 4081.91 279.95 3.64 164 11142.87 89,05 294,00 36.80 8991.60 3228,05 720,27 -4054.15 4117,64 280,07 0.98 165 11171.71 89,00 294,00 28,80 8992.09 3254,26 731,98 -4080.46 4145.59 280.17 0.17 166 11203.45 88.60 -294.10 31,70 8992,75 3283,11 744,87 -4109,41 4176,38 280.27 1.26 167 11235.24 88,60 294,10 31.80 8993,53 3312,05 757,80 -4138.46 4207.26 280.38 0,00 168 11266.83 86.90 295.10 31,60 8994,77 3340,92 770~92 -4167,17 4237.88 280.48 6,41 169 11299.53 86.60 294,40 32.70 8996.62 3370,81 784,59 -4196.82 4269.53 280.59 2.33 170 11331,46 86.60 295.10 32.00 8998,52 3400,06 797,96 -4225,83 4300,51 280,69 2.18 171 11363.16. 86,45 296,90 31,70 9000.44 3429,30 811,83 -4254,27 4331.04 280.80 5,69 172 11395.19 86.50 297,70 32,00 9002.41 3459,08 826,46 -4282,67 4361.68 280.92 2,19 173 11426,99 86,35 297,70 31,80' 9004,39 3488,74 841,16 -4310,79 4392,09 281,04 0,47 174 11458.63 87.00 298.70 31,60 9006,23 3518,33 856,04 -4338,61 4422,25 281,16 4,04 175 11490,57 87,55 299,80 32,00 9007,75 3548.51 871,66 -4366,49 4452,65 281.29 3,84 176 11522.57 87.60 299.50 32,00 9009.10 3578,77 887,45 -4394,29 4483,01 281.42 1,26 177 11554,15 88,15 301,60 31,50 9010,27 3608,71 903,43 -4421,41 4512.77 281,55 7,19 178 11586.53 88.25 302.30 32,40 9011,29 3639,76 920,56 -4448.89 4543.14 281.69 2,18 179 11618,36 88.20 302.30 31,90 9012,28 3670,39 937.60 -4475,84 4572,99 281,83 0.16 180 11650.26 87,70 303.40 31,90 9013,42 3701.09 954,89 -4502,62 4602,77 281,97 3,79 181 11682,15 87.70 304,10 31,90 9014.70 3731,92 972,60 -4529,13 4632.38 282.12 2,19 182 11714.29 87,55 304,50 32.10 9016.03 3763,02 990,68 -4555.62 4662,09 282.27 1,33 183 11745,62 86.10 304.50 31,30 9017,76 3793,35 1008,38 -4581,38 4691,04 282.41 4.63 184 11777.71 85.80 305.20 32,10 9020,03 3824.47 1026,67 -4607.65 4720,65 282.56 2,37 185 11808.82 85.80 304.90 31.10 9022.31 3854,65 1044.49 -4633.04 4749,32 282.70 0,96 186 11841,85 86.20 305.20 33.00 9024.61 3886,67 1063,39 -4659,99 4779,79 282,85 1.51 187 11873.16 86.95 307,00 31,40 9026,48 3917,29 1081,86 -4685.32 4808,60 283.00 6.20 188 11904,72 87.00 307.00 31.50 9028.15 3948.12 1100,79 -4710,44 4837,35 283.15 0,16 189 11937.24 87.15 307,40 32,50 9029,80 3979,95 1120,41 -4736,29 4867,01 283.31 1,31 190 11969,07 87,45 307,40 31.90 9031,31 4011,23 1139,77 -4761,61 4896,12 283.46 0,94 Srvy tool type MWD MWD MWD MWD MWD MWD MWD MWD MWD MWD MWD MWD MWD MWD MWD MWD MWD MWD MWD MWD MWD MWD MWD MWD MWD MWD MWD MWD MWD MWD MWD MWD MWD MWD MWD MWD MWD MWD MWD MWD MWD MWD MWD MWD MWD Page 5 Su, rvey Measured Incl Azimuth Course TVD Vertical Displacement Closure DLS # Depth angle angle length depth section +N/S- +E/W- displ azim (degl (ft) (deg) (deg) (ft) (ft) (ft) (ft) (ft) (ft) (deg) 1001') 191 11998,85 87,90 307,70 29,70 9032.51 4040.36 1157,85 -4785,13 4923.22 283.60 1,82 192- 12030,86 88.50 308,80 32.10 9033,52 4071,94 1177,72 -4810.33 4952,40 283,76 3,90 193 12062,71 90.95 309,20 31.80 9033.67 4103.31 1197.73 -4835.04 4981.18 283,91 7,81 194 12095,11 94.15 307,70 32,40 9032.23 4135,18 1217.85 -4860,39 5010,64 284.07 10,91 195 12126.66 96.95 308,50 31,60 9029,18 4166.11 1237.23 -4885,15 5039,39 284,21 9,13 196 12158.46 97.60 308.50 31.80 9025.15 4197.17 1256.83 -4909.87 5068.18 284.36 2.04 197 12192.05 97.75 308.80 33.60 9020.66 4229.98 1277.60 -4935.90 5098.56 284.51 1.26 198 12223.08 98.10 308.50 31.00 9016.39 4260.23 1296.76 -4959.89 5126.61 284.65 1.71 199 12254.46 96.15 308.80 31.40 9012.49 4290.93 1316.20 -4984.24 5155.10 284.79 6.34 200 12286.30 94.65 309.20 31.80 9009.50 4322.15 1336.12 -5008.84 5183.99 284.94 4.88 201 12317,88 94,50 308.80 31.60 9006.98 4353,23 1355.94 -5033,32 5212.77 285.08 1,35 202 12350,57 94,75 308,50 32,70 9004.34 4385.34 1376,28 -5058,79 5242,67 285,22 1,44 203 12381,24 94,90 309.20 30,60 9001,77 4415,40 1395,38 -5082,56 5270.63 285,35 2,65 204 12412,09 94,20 308,80 30,90 8999,32 4445,78 1414,77 -5106,50 5298.86 285,49 2,61 205 12441,84 93,70 307,70 29,70 8997,27 4474.94 1433.11 -5129,76 5326,19 285.61 4,06 206 12474,39 93,90 308,80 32,60 8995,11 4506,96 1453,25 -5155,31 5356,22 285,74 3,42 207 12505,45 92,90 309,20 31.00 8993,27 4537,48 1472,72 -5179,36 5384.67 285,87 3,47 208 12539.80 92,85 309,20 34,40 8991,55 4571,39 1494,44 -5205.98 5416,23 286.02 0,15 209 12570,33 92,25 310,30 30,50 8990,19 4601,51 1513,92 -5229.41 5444,14 286,15 4.10 210 12600,66 91,80 309,90 30,40 8989,12 4631,57 1533,49 -5252.65 5471,92 286,27 1.98 211 12634,12 91.80 309.50 33,40 8988,07 4664,56 1554.81 -5278.33 5502,57 286.41 1.20 212 12666,12 91,45 -310,30 32,00 8987.16 4696,20 1575,33 -5302,87 5531.92 286,55 2,73 213 12698,29 91,50 310.60 32,20 8986.33 4728.07 1596.21 -5327.37 5561,36 286,68 0,94 214 12730,32 91,70 310,30 32.00 8985.44 4759,75 1616.97 -5351,71 5590,65 286.81 1,13 215 12762,25 91,90 309,90 32,00 8984,43 4791,39 1637,57 -5376,17 5620,04 286,94 1,40 216 12794,06 92,.10 310.30 31,80 8983,32 4822,84 1658,04 -5400,48 5649.27 287.07 1,41 217 12825,51. 92,20 310.30 31.40 8982,15 4853,90 1678,33 -5424,41 5678.12 287,19 0,32 218 12857,63 92.20 311.30 32,10 8980.91 4885.69 1699,29 -5448.69 5707,53 287.32 3,11 219 12889,30 92,20 310,60 31,70 8979,70 4917,09 1720,05 -5472,62 5736,56 287,45 2,21 220 12920,97 92,25 311.70 31,70 8978.47 4948.51 1740,90 -5496.47 5765,58 287,57 3,47 221 12952,47 92,35 311,70 31,50 8977,20 4979,77 1761,84 -5519,97 5794,32 287,70 0,32 222 12984,79 92,30 311,70 32.30 8975.89 5011,82 1783,31 -5544.07 5823.82 287.83 0,15 223 13016,53 92.35 311,70 31,70 8974.61 5043,27 1804.38 -5567,72 5852,80 287.96 0.16 224 13047,91 92,60 311,70 31,40 8973,25 5074,43 1825,24 -5591.14 5881,53 288,08 0,80 225 13078,55 92.80 312,80 30,70 8971,80 5104,91 1845,86 -5613,84 5909.52 288,20 3.64 226 13150,00 92,80 312,80 71,40 8968,31 5175.88 1894.32 -5666,16 5974.43 288,49 0.00 Srvy tool type MWD MWD MWD MWD MWD MWD MWD MWD MWD MWD MWD MWD MWD MWD MWD MWD MWD MWD MWD MWD MWD MWD MWD MWD MWD MWD MWD MWD MWD MWD MWD MWD MWD MWD MWD EXT Page 6 TO: State of Alaska Alaska Oil and Gas Conservation Commission DATE: March 23, 1997 THRU: Blair Wondzell, FILE NO: P. I. Supervisor AINLDWDE.doc FROM: John Spauiding, SUBJECT: Petroleum Insp. BOPE Test Nabors 18E BPX / PBU well S-44 Prudhoe Oil Pool PTD 97-006 Sunday M..arch 30, 1997: I witnessed the BOPE Test on Nabors 18E, located at BPX's PBU well S-44. The AOGCC BOPE Test report is attached for reference. As noted in the test report no failures were observed. All components of the BOPE system worked quite well. The rig was in the process of receiving an internal coat of paint and was looking very clean. All areas around the rig were well organized leaving good access to the rig. Summary: I witnessed the successful BOPE test on Nabors 18E, 0 failures, 3 hours test time. Attachments: ainldwde.xls X Unclassified Confidential (Unclassified if document removed) Confidential STATE OF ALASKA OIL AND GAS CONSERVATION COMMISSION BOPE Test Report OPERATION: Drlg: Drlg Contractor: Operator: Well Name: Casing Size: 7" Test: Initial X Workover: Nabors Rig No. 18E PTD # BPX Rep.: S-44 Rig Rep.: Set @ 10,203 Location: Sec. Weekly X Other DATE: 3/23/97 97-006 Rig Ph.# 659-4608 Mike Whitely Don Dubois 35 T. 12N R. 12E Meridian Umiat TEST DATA MISC. INSPECTIONS: Location Gen.: Housekeeping: PTD On Location Standing Order Posted ok Well Sign yes ok (Gen) Drl. Rig ok ok · Hazard Sec. yes . yes o BOP STACK: Quan. Annular Preventer 1 Pipe Rams 1 Lower Pipe Rams 1 Blind Rams 1 Choke Ln. Valves 1 HCR Valves 2 Kill Line Valves Check Valve Test Press. P/F 300/3,000 P 500/5,000 500/5,00O 500/5,000 500/5,000 500/5,000 I 500/5,000 na MUD SYSTEM: Visual Alarm Trip Tank ok ok Pit Level Indicators ~k ok Flow Indicator ok ok Meth Gas Detector ok · ok H2S Gas Detector ok , ok FLOOR SAFETY VALVES: Upper Kelly / IBOP Lower Kelly / IBOP Ball Type Inside BOP Test Quan Pressure P/F I 500/5,000 P I 500/5,000 P 1 500/5,000 P 1 500/5,000 P CHOKE MANIFOLD: No. Valves No. Flanges Manual Chokes Hydraulic Chokes 16 Test Pressure P/F 500/5,000 P 42 500/5,000 P 2 P Functioned Functioned P ACCUMULATOR SYSTEM: System Pressure Pressure After Closure 200 psi Attained After Closure System Pressure Attained Blind Switch Covers: Master: Nitgn. Btl's: 2,950 P 1,400 P minutes 37 2 minutes 18 yes Remote: 8 ~ 2000 avg. Psig. sec. sec. yes ~ TEST RESULTS Number of Failures: 0 ,Test Time: ~3.0 ,/Hours. Number o~;valves tested 26 Repair or Replacement of Failed Equipment will be made within 0 days. Notify the Inspector and follow with Written or Faxed verification to the AOGCC Commission Office at: Fax No.- 276-7542 Inspector North Slope Pager No. 659-3607 or 3687 f your ca is not returned by the inspector within 12 hours please contact the P. I. Supervisor at 279-1433 REMARKS: Found the rig in very good condition, and had an exceflent test. Distribution: orig-Well File c - Oper./Rig c- Database c - Trip Rpt File c o Inspector STATE WITNESS REQUIRED? YES X NO 24 HOUR NOTICE GIVEN YES X NO Waived By: Witnessed By: FI-021 L (Rev. 12/94) AINLDWDE.XLS ~'ONY KNOWLE$, GOVEF~NOFI ALASKA OIL ~ GAS CONSERVATION COMMISSIO$ 3001 PORCUPINE DRIVE ANCHORAGE, ALASKA 99501-3192 PHONE: (907) 279-1433 FAX: (907) 276-7542 January. 24, 1997 Dan Stolz, Senior Drilling Engineer BP Exploration (Alaska) Inc. P O Box 196612 Anchorage, AK 99519-6612 Re: Prudhoe Bay Unit S-44 BP Exploration (Alaska) Inc. Permit No. 97-06 Surf Loc 4242qqSL, 4502'WEL, Sec 35, T12N, R12E, UM Btmhole Loc 7472qSL, 4811'WEL, Sec 27, T12N, R12E, UM Dear Mr Stoltz: Enclosed is the approved application for permit to drill the above referenced well. The permit to drill does not exempt you from obtaining additional permits required by law from other governmental agencies, and does not authorize conducting drilling operations until all other required permitting determinations are made. Blowout prevention equipment (BOPE) must be tested in accordance with 20 AAC 25.035. Sufficient notice (approximately 24 hours) of the BOPE test performed before drilling below the surface casing= shoe must be given so that a representative of the Commission may witness the test. Notice may be given by contacting the Commission petroleum field inspector on the North Slope pager at 659-3607. ' Chairm~n BY ORDER OF THE COMMISSION dlf/encl c: Dept of Fish & Game. Habitat Section - w/o encl Dept of Environmental Conser~'ation - w/o encl STATE OF ALASKA ALASKA OiL AND GAS CONSERVATION COMMISSION PERMIT TO DRILL 20 AAC 25.005 la. Typeofwork I~Drill I-IRedrill Ilb. Typeofwell I-IExploratory I-IStratigraphic Test I~Development Oil [] Re-Entry [] Deepen, [] Service [] Development Gas [] Single Zone [] Multiple Zone 2. Name of Operator 5. Datum Elevation (DF or KB) 10. Field and Pool BP Exploration (Alaska) Inc. Plan KBE -- 66.9' Prudhoe Bay Field / Prudhoe 3. Address 6. Property Designation Bay Pool P.O. Box 196612, Anchorage, Alaska 99519-6612 ADL 028258 4. Location of well at surface 7. Unit or Property Name 11. Type Bond (See 20 AAC 25.025) 4242' NSL, 4502' WEL, SEC. 35, T12N, R12E Prudhoe Bay Unit At top of productive interval 8. Well Number Number 2S100302630-277 4588' NSL, 2424' WEL, SEC. 34, T12N, R12E S-44 At total depth 9. Approximate spud date Amount $200,000.00 747' NSL, 4811' WEL, SEC. 27, T12N, R12E 01/27/97 12. Distance to nearest property line113. Distance to nearest well 14. Number of acres in property 15. Proposed depth (MD and TVD) ADL 028257, 4811' MDI No Close Approach 2560 12845' MD / 8980' TVD 16. To be completed for deviated wells 17. Anticipated pressure {see 20 AAC 25.035 (e)(2)} Kick Off Depth 600' Maximum Hole Angle 93.8° Maximum surface 3300 psig, At total depth (TVD) 8800' / 4390 psig 18. Casing Program Specifications Setting Depth Size Top Bottom Quantity of Cement Hole Casing Weight Grade Coupling Length MD TVD MD TVD (include stage data) 30" 20" 91.5# H-40 Weld 80' Surface Surface 110' 110' 260 sx Arctic Set (Approx.) 12-1/4" 9-5/8" 40# L-80 BTC-Mod 3205' Surface Surface 3205' 3129' 1930 sx CS III, 465sx'G',2500SII 8-1/2" 7" 26# L-80 BTC-Mod 9995' Surface Surface 9995' 8952' 595 sx Class 'G' 6" 4-1/2" 12.6# L-80 BTC-Mod 3000' 9845' 8870' 12845' 8980' 310 sx Class 'G' 19. To be completed for Redrill, Re-entry, and Deepen Operations. Present well condition summary Total depth: measured feet Plugs (measured) true vertical feet Effective depth: measured feet Junk (measured) true vertical feet Casing Length Size Cemented MD TVD Structural Conductor Surface IvP--D Intermediate Production ~ 0 9 1997 Liner Alaska 0il & Gas Cons. Commission Anchorage Perforation depth: measured true vertical 20. Attachments [] Filing Fee [] Property Plat [] BOP Sketch [] Diverter Sketch [] Drilling Program [] Drilling Fluid Program [] Time vs Depth PIct [] Refraction Analysis [] Seabed Report [] 20 AAC 25.050 Requirements Contact Engineer Name/~nber: David Nakamura, 564-5606 Prepared By Name/Number: Terrie Hubb/e, 564-4628 certify that e for 'goin ,;~ru.e ar~?c~rrect to the best of my knowledge ~/~ ,/~'/~ -/ 21.,herebYsigned PauIPrince Title Senior Drilling Engineer Date/.- Commission Use Only ~_ ~ ~ 50-~ Z ~'- .2- 2. ~ ~ ,5~ for other requirements Conditions of Approval: Samples Required [] Yes~ No Mud Log RequireO [] Yes ~ No Hydrogen Sulfide Measures ~s [] No Directional Survey Required ~g~ Yes [] No Required Working Pressure for BOPE [] 2M; []SM; ~ 5M; [] 1OM; [] 1SM Other: by order of Approved By Commissioner the commission Date Form 10-401 Rev. 12-01-85 Submit In Triplicate I Well Name: IS-44 / S-44L1 Well Plan Summary Type of Well (producer or injector): I Oil Producer Surface Location: 4242' FSL 4502' FEL Sec 35 T12N R12E Start of Horizontal Location: End of Horizontal Location: 747' FSL 4811' FEL Sec 27 T12N R12E Sadlerochit Zone 4 (lower) Lateral 4588' FSL 2424' FEL Sec 34 T12N R12E Start of Horizontal Location: End of Horizontal Location: 5093' FSL 993' FEL Sec 33 T12N R12E Sa~l River (upper) Lateral 4687' FSL 2666' FEL Sec 34 T12N R12E I AFE Number: 14P0855 I IRis]: I Nabors 18E Estimated Start Date: I Jan. 27, 1997 I I Operating days to complete: I 45 I MD: 1~2e45' I I TVD: 189e0' I IRT-GL I KBE: 29.7' 66.9' I I Well Design (conventional, slimhole, etc.) IUltra Slimhole High Angle Multi-Lateral (targeting Sadlerochit Zone 4 and Sag River) Formation Markers: Formation Tops MD TVD (RKB) SV3 2484' 2787' K-15 3672' 3580' Ugnu 3724' 3627' West Sak 5007' 4857' ~ Seabee 5434' 5267' CMl 6529' 6317' Kuparuk 6842' 6617' LCU 6920' 6692' Kingak 7863' 7597' ~. J-D 8460' 8169' J-B 8969' 8619' Sag River 9266' 8767' Shublik 9361' 8807' Sadlerochit 9629' 8897' TD of Sadlerochit Lateral 12845' 8980' TD of Sag River Lateral 14126' 8942' S-44 / S-44L1 Permit Info Page I Casinc]'l'ubing Proqram: Hole Size Csg/ Wt/Ft Grade Conn. Length Top Btm Tbg O.D. MD/TVD MD/TVD 30" 20" 91.5# H-40 Weld 80' Surface 110'/110' 12-1/4" 9-5/8" 40# L-80 BTC- 3205' Surface 3205'/3129' MOD 8-1/2" 7" 26# L-80 BTC- 9995' Surface 9995'/8952' MOD Lower Lateral MOD I 3000' I12845'/8980' Upper Lateral 6" I 4-1/2" 12.6#I L-80 IBTO'MOD I 4826' I 9300'/8781' I 14126'/8942' Tubing I 4-1/2" 12.6# I L-SO I BTC- I Surface MOD I0845/ I9845'/8870' Mud Proqram: Surface Mud Pro~perties· I Surface hole section: SPUD Density Marsh Yield 10 sec 10 min pH Fluid (PPG) Viscosity Point gel gel Loss Initial 8.5 + 300 40-60 30-60 50-80 9-10 15-25 Final 9.5 200-300 25-50 15-25 25-40 9-10 15-25 Hazards/Concerns Due to light gravel expectations, no real concerns in surface hole. Intermediate Mud Properties: I Intermediate hole section: LSND Density Marsh Yield 10 sec 10 min pH Fluid (PPG) Viscosity Point gel gel Loss Initial 8.8-9.0 35-40 8-12 3-6 8-10 9.0-9.5 8-12 Cretaceous 9.8 40-45 10-12 4-8 8-12 9.0-9.5 6-8 Final 10.0 45-50 12-15 4-8 8-12 9-10 <6 HTHP-13.0 Hazards/Concerns Cretaceous overpressure expected, MW to be at least 9.8 ppg. Utilize hi vis sweeps to assist hole cleaning Monitor LSYP and increase if problems occur trying to clean the hole. Potential high torque could need lubricants (EP MudLube/BDF 124) Reduce APl fluid loss to <6 cc before drilling Kingak Section. If high torque is encountered, respond with lubricants. Note: The Jurassic shales may be troublesome, so treat with Baratrol, Baranex, and Boreplate at 2.0 ppb each. Production Mud Properties: I Production hole section: Sheardril-n for Sadlerochit and Sag I River laterals Depth Density Marsh Yield 10 sec 10 min pH Fluid (PPG) Viscosity Point gel gel Loss Initial 8.8-9.0 50-60 30-40 15-20 18-24 8.5-9.0 <6 Final 8.8-9.0 50-60 30-40 15-20 18-24 8.5-9.0 <6 Hazards/Concerns Lost Circulation a possibility due to overbalance in Sadlerochit. Differential sticking possible with overbalance situation. Perform/report daily checks on KCI concentrations in Xanvis KCI system. High torque may be experienced and should be countered with lubricants (LubeTex) S-44 / S-44L1 Permit Info Page 2 Logging Program: I Logs: 12-1/4" Hole MWD Directional 8-1/2" Hole MWD Directional 6" Hole MWD GR/Directional/Resistivit¥ Cased Hole: CNL/CBT (optional) Directional: I KOP: 1600' I~aximum Hole Angle: Tangent Angle Close Approach Well: 93.8° 16.4° None Well Control: Well control equipment consisting of 5,000 psi W.P. pipe rams, blind rams, and annular preventer will be installed and is capable of handling maximum potential surface pressures. Diverter, BOPE and drilling fluid system schematics on file with AOGCC. JAN 0 9 1997 S-44 / S-44L1 Permit Info Page 3 , . . , . , . 10. 11. 12. 13. 14. 15. 16. PROPOSED DRILLING AND COMPLETION PROGRAM WELL: S-44 / S-44L1 MIRU. NU diverter and function test same. Drill 12-1/4" hole to _ 3205' MD/3129' TVD. Run and cement 9-5/8" 40# L-80 BTC-MOD casing to surface using Davis-Lynch Type 700 S-PVTS Screw-In Assembly. Install blowout prevention equipment consisting of 5000 psi W.P. pipe rams, blind rams, and annular preventer. Maximum possible bottomhole pressure is 4390 psi at 8800' TVDss based on original reservoir pressure. Maximum possible surface pressure is 3330 psi based on a gas column to surface from 8600' TVDss and an oil column to 8800' TVDss. Function test BOPE to 5000/250 psi. Test 9-5/8" casing to 3000 psi for 30 minutes (Record and graph the pressure vs amount pumped on casing test and use as a baseline for the leak-off test). A formation leak-off test will be performed when 20' of new hole has been drilled below the 9-5/8" shoe. Aisc, perform a well kill drill at this time. '"' Directionally drill 8-1/2" hole to 7" casing point at 9995' MD/8982' TVD. Run 7" 26# L-80 BTC-MOD casing string and cement with Class G cement to 1,000' MD above the Top Sag River. Test casing to 3,500 psi. The annulus will be freeze protected with dead crude oil. Drill 20' of new 6" hole and test the formation to a minimum of 0.5 ppg over the mud weight to be used to drill the previous hole section. Displace mud system to Sheardril-n mud system. Directionally drill high angle section with MWD/GR/Resistivity to TD at _ 12845' MD/8980' TVD. RIH with 4-1/2", 12.6#, L-80 solid liner, 7" x 4-1/2" packer/hanger spaced out for a 150' lap and a 2-3/8" inner wash string. Cement liner in place through the inner wash string with the total cement volume based on 40% excess in open hole, 150' lap and 80' shoe volume. Displace the cement with seawater. Bump plug. Set and test liner hanger/packer with 3500 psi. RIH with 2-3/4" drillpipe conveyed perf guns and perforate 4-1/2" liner. POOH and lay down guns. Set 7" x 4-1/2" permanent production packer (with 4-1/2" tubing tail) at 9295' MD (17' MD below the planned top of whipstock). Set oriented, retrievable whipstock above permanent packer so the top of the whipstock window will be at 9278' MD. Displace well to Sheardril-n mud system used to drill lower lateral. Mill window off whipstock at 9278' MD and drill 29' window/new hole. POOH. RIH with 6" steerable assembly (MWD/GR/Resistivity). Finish kickoff and directionally drill in Sag River, drilling 6" horizontal hole to TD at 14126' MD/8942' TVD. Run and set a 4-1/2", L-80 slotted liner. Top of liner will be at 9300' MD (10' below casing exit/base of whipstock). RIH and pull retrievable whipstock. Run 4-1/2", 12.6 # L-80 IBT-MOD tubing with SSSV, GLMs, and 7" packer assembly. Space out tubing packer so tail pipe is inside of liner hanger tieback. Circulate around freeze protection fluid and corrosion inhibitor. Set packer and test tubing to 4,000 psi. Set TWC and test to 1000 psi. ND BOPE. NU tree and test to 5000 psi. Pull TWC. Test tubing x casing annulus to 3500 psi for 30 minutes. Secure well. Release rig. S-44 / S-44L1 Permit Info Page 4 Drilling Hazards Hydrocarbon-bearing zone in the Ugnu formation. Losses have been encountered drilling the Kingak, Sag RivedShublik and Sadlerochit formations on S Pad. Be prepared for losses near any faults and formation interfaces between the Kingak, Sag River/Shublik and Sadlerochit. A minimum of 9.8 ppg mud weight will be used to drill the Cretaceous injection interval. This will allow a 100 psi trip margin over the expected 9.4 ppg EMW @ 5000' TVDss. Disposal Cuttings Handling- Fluid Handling' Cuttings should be hauled to the ball mill at CC-2A. Haul all drilling and completion fluids and other Class II wastes to CC-2A for injection. Haul all Class I wastes to Pad 3 for disposal. In addition, haul all cutting from drilling operations to CC- 2A for disposal, except the metal cuttings which will be sent to the North Slope Borough. S-44 / S-44L1 Permit Info Page 5 9-5/8" SURFACE CASING CEMENT PROGRAM - BJ SERVICES CASING SIZE: 9-5/8" CIRC. TEMP: 38°F PREFLUSH: 75 bbls fresh water ahead of lead slurry. LEAD CEMENT TYPE: COLD SET III ADDITIVES: retarder WEIGHT: 12.2 ppg APPROX. # SACKS: --+1930 YIELD: 1.92 ft3/sx MIX WATER: 10.53 gps THICKENING TIME: Greater than 4 hr. @ 50°F TAIL CEMENT TYPE: CLASS G ADDITIVES: 2% A-7 +1 ghs FP-6L WEIGHT: 15.8 ppg YIELD: 1.15 ft3/sx APPROX. # SACKS: 465 MIX WATER: 4.95 gps THICKENING TIME: Greater than 3-1/2 hr. @ 50°F TOP JOB CEMENT TYPE: COLD SET II (if necessary) ADDITIVES: WEIGHT: 14.5 ppg APPROX. # SACKS: 250 YIELD: 0.96 ft3/sx MIX WATER: 3.89 gps THICKENING TIME: Greater than 2 hr. @ 50°F CENTRALIZER PLACEMENT: 1. Run 1 turbolator (9-5/8" x 12") per joint for the first 15 joints. 2. Run two turbolators (9-5/8 x 12") per joint for the next 19 joints (to the Base of the Permafrost) CEMENT VOLUME: 1. Lead slurry volume estimated: a. Surface casing shoe to Base Permafrost with 30% excess b. Base of Permafrost to Conductor shoe with 500% excess c. Conductor x Surface Casing annulus (80' MD) NOTE: With the stab-in job, the actual lead cement volumes will be determined by the amount of cement necessary to get lead cement to surface. 2. Tail slurry volume from surface casing shoe to Base Permafrost with 30% excess plus the 80' shoe volume 3. Top job volume 250 sx (if necessary). The increase in excess volume to cover the Permafrost to 500% excess is based primarily upon not bringing cement to surface with 100% excess on the two most recent N Pad wells. The history of N Pad surface casing cement jobs indicated that with 100% excess, cement has been brought up to surface. S-44 / S-44L1 Permit Info Page 6 7" PROTECTION CASING CEMENT PROGRAM - BJ SERVICES CASING SIZE: 7" CIRC. TEMP' 140°F PREFLUSH: 20 bbls fresh water SPACER' 50 bbls BJ MCS-4 Spacer weighted 1.0 ppg above mud weight. LEAD CEMENT TYPE: CLASS G ADDITIVES: 3% A-2 + 0.4% FL-52 + 0.5% CD-32 + 1 ghs FP~6L WEIGHT: 11.0 ppg YIELD: 3.31 ft3/sx MIX WATER: 20.92 gps APPROX. # SACKS: 290 THICKENING TIME: 5 hrs FLUID LOSS: 150-250 cc/30 minutes FREE WATER: 0 cc TAIL CEMENT TYPE: CLASS G ADDITIVES: 0.3% FL-52 + 0.5% CD-32 + 0.1% A-2 + 1.0 ghs FP-6L WEIGHT: 15.8 ppg YIELD: 1.14 ft3/sx MIX WATER: 4.85 gps JAN 0 9 997 APPROX. # SACKS: 305 THICKENING TIME: 3-1/2 to 4-1/2 hrs FLUID LOSS: 100-150 cc/30 minutes FREE WATER: 0 cc CENTRALIZER PLACEMENT: 1. Run 1 Turbulators per joint from TD to 500' MD above shoe. 2. Run 1 straight blade rigid centralizer every joint 300' above and below the Ugnu. OTHER CONSIDERATIONS: Perform lab tests on mixed cement/spacer/mud program and ensure compatibility prior to pumping job. Ensure thickening times are adequate relative to pumping job requirement. Displace at 12 bpm. Mix the lead and tail slurries on the fly. CEMENT VOLUME: 1. Lead slurry to 3224' MD (500' above Ugnu) with 50% excess 2. Tail slurry to 8266' MD (1000' above Sag River) with 50% excess 3. 80' MD 7" 26# capacity for float joints. Note: Hydrocarbon bearing zones are identified in the Ugnu and Sag River intervals. s-44 / S-44L1 Permit Info Page 7 4-1/2" PRODUCTION LINER (UPPER LATERAL) CEMENT PROGRAM - BJ SERVICES CIRC. TEMP: 140° F PREFLUSH: 20 bbls 2% KCI water BHST: 220° F at 8800' TVDss SPACER' 50 bbls BJ MCS-4 Spacer weighted 1.0 ppg above mud weight with 2% KCl CEMENT TYPE: CLASS G with 2% KCI ADDITIVES: 175 ghs BA-86L + 2% A-9 + 0.6% CD-32 + 0.3% FL-33 + 0.2% A-2 + 0.5% gel + 1 ghs FP-6L WEIGHT: 15.7ppg YIELD: 1.19ft3/sx MIX WATER: 3.43gps APPROX. # SACKS: 310 THICKENING TIME: 45 min. @ Surface + 3-4 hr. @ 140°F FLUID LOSS: less than 50 cc/30 minutes @ 140°F FREE WATER: 0 cc at 45° angle. CENTRALIZER PLACEMENT: 1. Run 2 right hand turbolators per joint in open hole, 2. Run 1 right hand turbulator per joint in lap, and none opposite intermediate casing shoe.. OTHER CONSIDERATIONS: Batch mix the cement slurry. Perform fluid loss test on the batch mixed slurry. Fluid loss should be 50 cc/30 min. or less. Report actual fluid loss on morning report. Displace @ 6-8 bpm. LINER CEMENT VOLUME: 1. Open hole (6" X 4-1/2") + 40% excess (adjust if a caliper Icg is run and it indicates severe washouts). 2. 4-1/2", 12.6# casing capacity below landing collar (80'). 3. 150' liner lap 4-1/2" PRODUCTION LINER (LOWER LATERAL) No cement necessary - slotted liner. S-44 / S-44L1 Permit Info Page 8 Dec-27-g6 10:05A Anadr;ll DPC 907 t44 2160 ._ I SHARES ,SEI:iVT,CES 'BRTLLIN6 ' Ci P.13 im i' ~ i ii,. b-44 i ' .~ VERTICAL SECTION VIEW , .... B-- I .I "' !' sect ion at: 318.45 c-- ~ i i TVD SCale.; 1-~nch = 1200 feet ' ~-- i , Dep Scale.: ~ inch = 12'00 feet m m o- ! '~[ Drawn., .... : -17 Dec,i ~996 ...... ' ,__ ..... ~,i... .-"1, .......... · " i ' '~naUrjYY $chYumberger i--- Marker IOentif~cat~on MD BKB SECIN INCLN i i ~) KB 0 O.. 0 0.00 __, , B) KOP/BUILD 1/100 600 600 0 0.00 ' ........ )~Y-~) C) ~ILD 1.5/~00 ~0 900 5 3.00 i- -I D) BUILD 2/1~ 1300 1297 35 9.00 E) 'CURVE 2.5/100 lBO0 ' t782. ~18 ~9.00 ' 'Fi. END 2.5/t00 CURVE ]920 ~896 145 16~43 ~ - _ ~ L, .... G] 9-5/8" CASING POINT 3205 3129 459 16.43 ' . ] ~T~-~ H) CURVE JO/~O0 ~56 8357 . iS84. 36-.43 ' ·~; I) E~ ~0/~00 CURVE -9~4~ e7~4 ~8t6 65.00 . J) CURVE ~0/~00 ' -94~6 BB30 2004. 65.00 '-~' I - .... KI ENO ~0/~00 C~VE  L). CURVE i2/lO0' · ~ 97m egis 2~81" 77.93- m M) 7"- CASING POINT 9995 8952 ' 2384 87;39 N) BSL - TGT START 9995 8952 2384 87.39 ; .... :l ; ' "' ~t~'~ O) END ~2/~'-CURVE -' -ggeS 8952:~384 B7:39 . ~ P) CURVE ]7/JO0". ~862 ~37 4069 87.39 ~) END ~7/tOOCURVE ~20~6 ~35 4238 93.82 qO,~t~ E.;~ . R)-4-S/2" CASING POINT ~2845 8gBO 5046 93.82 S).TD - TARGET ENO '. I2845 8980 5046 93.82 · ' ANADRII~L J ' A~-DPC J. ' -~.,-~,~,- .... t---, -~ - -' APP~ROV ED ....-~ PLAN':~15 ")' : - .... '---'- ...... - - ::-. ' .... , .~ J,~N 0 9~ ~997 ~~ "~? ' ....... ~ ' = = =: J ~~ ~ ~ ~ = = = = = = = = = = ...._ _ ~ ~ " ....... ~ ~~ . p ) R I ' , , I , 0 600 ~200 1800 2400 3000 3600 4~00 Section De )arture 4800 5400 6000 6600 7200 7800 SHARED SERV"ICES i i ill i . i i i iii il DRILLING ANADRILL AKA-DPC APPROVED FOR PERMITTING ONLY pLAN ~__j~_ .... ~.__ -,.~~. .......... ~ ,-""-'~"~'~'.--.--':'~"~ ~ , ,4nadrJ 1] $£h]umberger . S-44 (P LS) PLAN VIEW CLOSURE · 5870 feet at Azlmuth 287.74 DECLINATION' +28.396 (E) SCALE '.1 inch = 800 feet DRAWN · 17 Dec 1996 ., m , Marker Identification MD N/S E/W A) KB 0 0 N 0 E B) KDP/BUILD ]/]DO 600 0 N 0 E C) BUILD 1.5/100 go0 0 N B W D) BUILD 2/100 1300 2 N 50 W E) CURVE 2.5/100 tBO0 7 N 170 W F) END 2.5/100 CURVE 1920 10 N ~07 W G) 9-5/8" CASING POINT 3205 58 N 567 W H) CURVE lOllO0 8656 260 N 2095.-W-2800 .. ':' J) CURVE lO/lO0 9416 333 ' ' ' ' K) END .i0/1~ CURVE 96t8 329 N 2637 W ~ , ~ : '~' ,, . ~ L) CURVE 12/100 9719 314 N 293~2400 ' I ~ ....... '' ' ' ' , H) 7" CASING POINT 9995 348 N 3202 W , ; I N) BSL - TGI START 9995 348 N 3~02 W ' : .. i'0) END 12/100 CURVE 9995 346 N 3202 ..... / ' : '. ,. ',, "7:' -"' O) ENO 17/100 CURVE ~20~6 ~8 N 504~2000 ' ; ,. . RI ~'1/~" C~SINO POINT ~2845 1788 ; , ~ :' , S) ID - TARGET .END 12845 t788 N 5591_W ~ ' ~ ' ' 1600 m ) . . ~ ,, ~ . ~ . , ' . .... ; . . . - . .... , ~ '. .... .. ., , . . , . ~, , , , , , ,,, ,, i~, ., ' , , , ',,, , 'i j , i. , .I , ,,. · I. ,, , . , ' ' I figO0 $400 [000 5riO0 5200 agO0 ~00 ~000 ~$00 ~00 ~00 ~400 ~000 ~00 ~00 800 m mm m m j mm m mm m 1_ m m (~aOr]ll (c)~ S44P15 3,Ob. ID ~49 ~ P} il) fi I I 0 Anadrill Schlumberger Alaska District 1111 East 80th. Avenue Anchorage, AK 99518 (907) 349-4511 Fax 344-2160 DIRECTIONAL WELL PLAN for SHARED SERVICES DRILLING Well ......... : S-44 (P15) Field ........ : Prudhoe Bay, S-Pad Computation..: Minimum Ctlrvature Units ........ : FEET Surface Lat..: 70.35522718 N Surface Long.: 149.03416937 W Legal Description Surface ...... : 4241 FSL 4502 FEL S35 T12N R12E UM Target Start.: 4588 FSL 2424 FEL S34 T12N R12E LTM BHL -Tgt End: 747 FSL 48il FEL S27 T12N R12E UN LOCATIONS - ALASKA Zone: 4 X-Coord Y-Coord 618929.90 5980445.00 ~%~-' 615723.00 5980742.00 J~ 613312.00 5982144.00 [~"~ PROPOSED WELL PROFILE STATION MEASURED INCLN DIRECTION IDENTIFICATION DEPTH ANGLE AZIMUT~ KB 0.00 0.00 0,00 KOP/BUILD 1/100 600.00 0.08 272.49 700.00 1.00 272,49 800.00 2.00 272.49 BUILD 1.5/100 900.00 3.00 272.49 VERTICAL-DEPTBS SECTION TVD SUB-SEA ..DEPART 0.00 166.90 600.00 533.10 699.99 633.09 799.96 733.06 899.86 832~96 0.00 0.00 0 6~ 2 ;43 5 46 Prepared ..... : 17 Dec 1996 Vert sect az.: 318.45 KB elevation.: 66.90 ft Magnetic Dcln: +28.396 (E) Scale Factor.: 0.99991607 Convergence..: +0.909624~5 ANADRILL APPROVED FOR PERMITTING ONLY PLAN AKA-DPC Jm~m COORDINATES-FROM ALASKA Zone 4 TouL DL/ WELLHEAD X Y FACE 100 0.00 N 0.00 E 618929.90 5980445,00 88L 0.00 0.00 N 0.00 E 618929.90 5980445,00 88L 0.00 0.04 N 0.87 W 618929.03 5980445.02 88L 1.00 0.15 N 3,49 W 618926.41 5980445.10 88L 1.00 0.34 N 7.84 W 618922.05 5980445.22 88L 1.00 BUILD 2/100 1000.00 4.50 272.49 1100.00 6.00 272.49 1200.00 7.50 272.49 1300.00 9.00 272.49 1400.00 11.00 272.49 1500.00 13.00 272.49 1600.00 15.00 272.49 999.65 932.75 1099.22 1032.32 1198.53 1131.63 1297.49 1230.59 1395.97 1329.07 1493.78 1426.88 1590.80 1523.90 10 00 16,37 24 54 34.51 46 58 61 03 77.85 0.63 N 14,38 W ~1.02 N 23.52 W 1.54 N 35.26 W 2.16 N 49.60 W 2.92 N 66.94 W 3.82 N 87.72 W 4.87 N 111.88 W 618915.51 5980445.40 88L 1.50 618906.37 5980445.65 HS 1.50 618894,62 5980445.98 HS 1.50 618880.28 5980446.37 HS 1.50 618862.92 5980t46.85 HS 2.00. 618842.14 5980447.43 HS 2.00 618817.96 5980448.10 HS 2.00 (Anadrill (c) 96 S44P15 3.0b.10 2:47 PM P) STATION MEASURED INCLN IDENTIFICATION DEPTH ANGLE 1700.00 17.00 CURVE 2.5/100 1800.00 19.00 1900.00 1&.84 END 2.5/100 CURVE 1919.57 16,43 SV3 2848.48 16.43 9-5/8" CASING POINT 3205.00 16.43 K15 3672,10 16.43 TOP UGNU 3724.23 16.43 TOP WEST SAK '5006.59 16.43 TOP COLVILLE/SEABEE 5434.04 16.43 CMl 6528.74 16,43 KUPARUK SANDSTONE 6841.51 16.43 LCU 6919.70 16.43 KING~K 7.863.22 16.43 TJD 8459.5'7. 16.43 CURVE 10/100 8655.51 16.43 8700.00 20.88 8800.00 30.88 8900.00, 40.88 TJB 8968.71 47.75 9000,00 50.88 CURRENT GOC 9004.14 51.29 9100.OD 60,88 END 10/100 CURVE 9141.22 65.00 SAG'RIVER 9266.22 65,00 s.u.mK 9360.87 65.00 ~R%~ 10/~00 9415,87 ~S.OO 9500.00 70.20 PROPOSED WELL PROFILE DIRECTION VERTICAL-DEPTHS AZIMUTH TVD SUB-SEA ......... 272.49 1686.92 1620.02 272.49 1782.02 1715.12 276.60 1877.17 1810.27 277.52 1895.92 1829.02 277.52 2786.90 2720.00 277.52 3128.87 3061.97 277.52 3576,90 3510.00 277.52 3626.90 3560.00 277.52 4856.90 4790.00 277.52 5266.90 5200.00 SECTION DEPART ~7.01 118.49 140.60 144.80 3{3.27 419.44 519,24 530.38 804.37 '895,70 277.52 6316.90 6250.00 1129.59 277,52 6616.90 6550~00 1196.42 277.52 6691.90 6625.00 1213,12 277.52 7596.90 7530.00 ~4~4,72 277.52 8168.90 8102.00 1542.13 277.52 8356.8~ 8289.94 1584.00 277.52 8398-98 8332.08 1594.74 277.52 8488.84 8421.94 1627.67 277.52 8569.77 8502.87 ~671.89 277.52 8618.90 8552.00 1708.13 (Anadrill (c)96 S44P15 3,0b.10 2:47 PM P) 277.52 8639.30 8572.40 1726.05 277,52 8641.90 8575,00 1728.49 277.52 8695.32 8628.42 1788.51 277,52 8714'.07 8647.17 1816,2~ 277.52 8766.90 8700.00 ]901.82 277.52 8806.90 8740.00 ]966.62 277.52 8830.14 8763.24 2004.28 270.36 8862.23 8795.33 2059.61 ==== .-- COORDINATES-PROM ~ALASKA Zone 4 TOOL DL/ W~LLHEAD X Y FACE 100 6.07 N 139.42 W 618790.41 5980448.86 ~S 2.00 7.42 N 170.29 W 618759.53 5980449.71 152R 2.00 9.79 N 200.95 W 618728.84 5980451.60 148R 2.50 10.48 N 206,51 W 618723.27 5980452.20 NS 2.50 44.86 N 466.97 W 618462.32 5980482.43 ~S 0.00 58.05 N 566.93 W 618362,16 5980494.04 HS 0.00 75.34 N 697,91 W 618230,94 5980509,24 HS 0.00 77.27 N 712.52 W 618216.30 5980510.94 ~S 0.00 124.73 N 1072.09 W 617856.06 5980552.68' ~S 0.00 140.55 N 1191.94 W 617735.98 5980566.60 ~S 0.00 181.06 N 1498,89 W 617428.45 5980602.23 HS . 0.00 192'.64 N 1586.~9 W 617340.59 5980612,41 ~S 0.00 195,53 N 1608.51 W 617318.62 598'0614.96 ~S 0.00 230.45 N 1873.07 W 617~53.57 5980645.67 HS 0.00 252.52 N 2040.28 W 616886.04 5980665.08 ~S 0.00 259.77 N 2095.22. W 616831.00 5980671.46 HS 0.00 261.63 N 2109,32 W 616816.87 5980673.10 HS I0.00 267.34 N 2152.54 W 616773.57 5980678.11 ~S 10.00 275.00 N 2210.57 W 616715.43 5980684.85 ~S 10.00 281.27 N 2258.12 W 616~67.79 5980690.37 HS 10.00 284,38 N 2281.65 W 616644.22 5980693,10 2~4.80 N 2284.84 W 616641.02 5980693.47 295.20 N 2363.61 W 616562.10 5980'702.62 300.00 [] 2400.00 W 616525.64 5980706.84 314.82 N 2512.31 W 616413.12 5980719.88 NS 10.00 HS 10,00 BS 10.00 HS 10.00 HS 0.00 326.05 N 2597.36 W 332.57 N 2646.78 W 337.82 N 2724.29 W 616327.91 5980729.75 616278.40 5980735.49 616200.82 5980739.50 HS 0. O0 53L 0.00 51L 10.00 ANADRILL ' AKA-DPC APPROVED FOR PERMITTING ONLY O PROgCSED WELL PROFILE Der ~B~d STATION IDENTIFICATION END 10/100 CURVE TSAD CURVE 12/100 7" CASING POINT BSL - TGT START END 12/100 CURVE CURVE 17/100 END 17/100 CURVE 4-1f2" CASING POINT TD - TARGET END M~I~SURED DEPT~ iNCLN DIRECTION VERTICAL-DEPTHS SECTION ANGLE AZIMUTH TVD SUB-SEA DEPART 9600.00 76.72 262.45 8890.72 8823.82 2118.39 9618.07 77.93 261.07 8894.69 8827.79 2128.07 9628.65 77.93 261.07 8896.90 8830.00 2133,65 9718.89 77.93 261.07 8915.77 8848.87 2181.21 9750.00 78.86 264.76 8922.63 8855.i3 2198.45 COORDINATES-FROM WELLHEAD ~ ~=: ...... 331.71 N 2819.81 329.18 N 2837.26 327.57 N 2847.48 313.87 N 2934.65 310.11 N 2964.89 9800.00 80.45 270.64 8931.02 8864.12 2229.55 308.15 N 9850.00 82.13 276.47. 8938.60 8871.70 2264.55 311.21 N 9900.00 83.90 282.24 8944.69 8877.79 2303,05 319.28 N 9950.00 85.72 287.98 8949.22 8882.32 2344'.63 332.26 N 9994.67 87.39 293.09 8951.90 8885.00 2384.02 347.90 N 9994.67 87,39 293.09 8951.90 8885.00 2384..02 9994.67 87.39 293.09 8951.90 8885.00 2384.02 11861.74 87.39 293.09 9036.90 8970.00 4069.32 11.900.00 88.99 299.39 9038.'11 8971.21 4104.70 11950.00 91.10 307.63 9038.07 8971.17 4152.97 12000.00 93.18 315.88 9036.20 8969.30 4202.54 12015.60 93.82 318.45 9035.24 8968'.34 42~8.11 12845.44 93.82 318.45 8979..90 8913.00 5046.10 12845.44 93.82 318.45 8979.90 8913.00 ,5046.10 ALASKA Zone 4 Y 616105.41 5980731.87 616088.01 5980729.07 616077.82 5980727.30 615990.88 5980712.22 615960.71 5980707.98 3014.01 W 615911.63 5980705.24 3063.32 W 615862.29 5980707.52 3112.'26 W 615813.23 5980714.81 3160.31 W 615764.98 5980727.03 3202.05 W 615723.00 5980742.00 347~90 N 3202.05 W 347~90 N 3202.05 W 1079..29 N 4917..80 W 1096.19 N 4952.08 W 1123.77 N 4993.73 W 615723.00 S980742.00 ~15723.00 5980742.00 613996.'00 5981446.00 6.13961.46 5981462.35 613919.38 5981489.26 1157.01 N 5030.97 W 1168.43 N 5041.$6 W 1788.12 N 5590.69 W 1788.12 N '55.90.69 W 613881.62 5981521.91 613870.85 5981533.15 613312.00 5982144..00 613312.00 5982144.00 [Anadrill (c)96 S44P15 3.0b.10 2:67 PM P) ANADRILL AKA-DPC APPROVED FOR PERMITTING ONLY PLAN .... _ ~ . TOOL DL/ FACE 100 .... 48L 10.00 HS 10.00 ~S 0.00 76R 0.00 75R 12.00 74R 12.00 73R 12.00 73R 12.00 72R 12.00 BS 12.00 RS 12.00 RS 12.00 76R 0.00 76R 17.00 76R 17.00 76R 17.00 HS '17.00 0.00 0.00 O .--LL PERMIT CHECKLISToo. y POOL PROGRAM: expD dev~ redrlD servr] wellbore segr] ann disp para req~ ADMINISTRATION 1. Permit fee attached .................. N 2. Lease number appropriate ............... N 3. Unique well name and number .............. N 4. Well located in a defined pool ............. N 5. Well located proper distance from drlg unit boundary. . N 6. Well located proper distance from other wells ..... N 7. Sufficient acreage available in drilling unit ..... N 8. If deviated, is wellbore plat included ........ N 9. Operator only affected party .............. N 10. Operator has appropriate bond in force ......... N 11. Permit can be issued without conservation order .... N 12. Permit can be issued without administrative approval. . N 13. Can permit be approved before 15-day wait ....... N ENGINEERING 14. 15. 16. 17. 18. 19. 20. 21. 22. 23. 24. 25. 26. 27. 28. 29. Conductor string provided ............... ~ N Surface casing protects all known USDWs ........ ~ N CMT vol adequate to circulate on conductor & surf csg. .~ N CMT vol adequate to tie-in long string to surf csg . . . CMT will cover all known productive horizons ...... Y~ N Casing designs adequate for C, T, B & permafrost .... ~ N Adequate tankage or reserve pit ............. ~ ~~_ If a re-drill, has a 10-403 for abndnmnt been approved. Adequate wellbore separation proposed ......... .~ N If diverter required, is it adequate .......... Drilling fluid program schematic & equip list adequate . Y~ N BOPEs adequate .................... ~ N BOPE press rating adequate; test to ~--d~-~ ps~g N Choke manifold complies w/API RP-53 (May 84) ...... N Work will occur without operation shutdown ....... N Is presence of H2S gas probable ............ N GEOLOGY APPR D~TE 30. Permit can be issued w/o hydrogen sulfide measures .... Y N//-- 31. Data presented on potential overpressure zones ..... Y /N ;~ /~ 32. Seismic analysis of shallow gas zones .......... / N /~v 33. Seabed condition survey (if off-shore) ........ / Y N 34. Contact name/phone for weekly progress reports . . .J . Y N [exploratory only] REMARKS GEOLOGY: ENGINEERING: COMMISSION: BEW bV JDH~ mcm "~.~ Comments/Instructions: HOW/dlf- A:\FORMS\cheklist rev 01197 Well HistorY File APPENDIX Information of detailed nature that is not particularly germane to the Well Permitting Process but is part of the history file. To improve the readability of the Well History file and to simplify finding information, information of this nature is accumulated at the end of the file under APPENDIX. No special effort has been made to chronologically organize this category of information. * ALASKA COMPUTING CENTER . ****************************** . ............................ * ....... SCHLUMBERGER ....... . ............................ ****************************** COMPANY NAME : BP EXPLORATION WELL NAME : S-44 FIELD NAME : PRUDHOE BAY BOROUGH : NORTH SLOPE STATE : ALASKA API NUMBER : 50-029-22735-00 REFERENCE NO : 97164 * ALASKA COMPUTING CENTER * ....... SCHLUMBERGER ....... COMPANY NAME : BP EXPLORATION WELL NAME : S~44 FIELD NAME : PRUDHOE BAY BOROUGH : NORTH SLOPE STATE : ALASKA API NUMBER : 50-029-22735-00 REFERENCE NO : 97164 LIS Tape Verificat=~ Listing Schlumberger Alaska Computing Center lO-FEB-1998 15:55 PAGE: **** REEL HEADER **** SERVICE NAME : EDIT DATE ' 98/02/10 ORIGIN : FLIC REEL NAME : 97164 CONTINUATION # : PREVIOUS REEL : COf4MENT : B.P. EXPLORATION, PRUDHOE BAY S-44, API #50-029-22735-00 **** TAPE H~ER **** SERVICE NAME : EDIT DATE : 98/02/10 ORIGIN : FLIC TAPE NAME : 97164 CONTINUATION # : 1 PREVIOUS TAPE : COMMENT : B.P. EXPLORATION, PRUDHOE BAY S-44, API #50-029-22735-00 TAPE HEADER Prudhoe Bay MWD/MADLOGS WELL NAME: API ~ER: OPERATOR: LOGGING COMPANY: TAPE CREATION DATE: JOB DATA JOB NUMBER: LOGGING ENGINEER: OPERATOR WITNESS: SURFACE LOCATION BIT RUN 1 97164 BROWN WHITELY SECTION: TOWNSHIP: RANGE: FNL: FSL: FEL: FWL : ELEVATION (FT FROM MSL O) KELLY BUSHING: DERRICK FLOOR: GROUND LEVEL: WELL CASING RECORD 1ST STRING 2NDSTRING S-44 500292273500 BP Exploration SCHLUMBERGER WELL SERVICES lO-FEB-98 BIT RUN 2 BIT RUN 3 .................. 35 12 12 66.20 66.20 36.50 OPEN HOLE CASING DRILLERS BIT SIZE (IN) SIZE (IN) DEPTH (FT) 8.500 9.625 3066.0 6.000 7.000 10205.0 LIS Tape Verificat~_~ Listing Schlumberger Alaska Computing Center lO-FEB-1998 15:55 3RD STRING PRODUCTION REMARKS: STRING Well drilled 10-MAR through 21-MAR-97 with MWD GR and ARCS. Data was collected in 3 bit runs. The MWD GR data was field spliced and considered one bit run, and the ARC5 was run on two bit runs. No depth shifts were applied to this data as per Troy Weiss via D. Douglas. $ $ PAGE: **** FILE H~ER **** FILE NAME : EDIT .001 SERVICE ' FLIC VERSION : O01CO1 DATE · 98/02/10 MAX REC SIZE : 1024 FILE TYPE : LO LAST FILE : FILE HEADER FILE NUM~ER: 1 EDITED MERGEDMWD Depth shifted and clipped curves; all bit runs merged. DEPTH INCREMENT: 0.5000 FILE SUMMARY LDWG TOOL CODE START DEPTH STOP DEPTH ................................... MWD 8947.5 13151.0 $ BASELINE CURVE FOR SHIFTS: NONE CURVE SHIFT DATA (MEASURED DEPTH) BASELINE DEPTH .............. $ MERGED DATA SOURCE LDWG TOOL CODE .............. $ No depth adjustments were made to this data as per Troy Weiss via D. Douglas. $ .......... EQUIVALENT UNSHIFTED DEPTH .......... ....... BIT RUN NO. MERGE TOP MERGE BASE 1 8947.5 10165.0 2 10169.0 12027.0 3 11954.0 13151.0 LIS FORMAT DATA LIS Tape Verificat=_~ Listing Schlumberger Alaska Computing Center lO-FEB-1998 15:55 PAGE: ** DATA FORMAT SPECIFICATION RECORD ** ** SET TYPE - 64EB ** TYPE REPR CODE VALUE 1 66 0 2 66 0 3 73 36 4 66 255 5 66 6 73 7 65 8 68 0.5 9 65 FT 11 66 28 12 68 13 66 0 14 65 FT 15 66 68 16 66 1 0 66 0 ** SET TYPE - CHAN ** NAME SERV UNIT SERVICE API API API API FILE NUMB NUMB SIZE REPR PROCESS ID ORDER # LOG TYPE CLASS MOD NUMB SAMP ELEM CODE (HEX) DEPT FT 39498 O0 000 O0 0 1 1 1 4 68 0000000000 ROP MWD F/HR 39498 O0 000 O0 0 1 1 1 4 68 0000000000 FET MWD HR 39498 O0 000 O0 0 1 1 1 4 68 0000000000 GR MWD GAPI 39498 O0 000 O0 0 1 1 1 4 68 0000000000 RPXXMWD OHMM39498 O0 000 O0 0 1 1 1 4 68 0000000000 RPX MWD 0Pi~39498 O0 000 O0 0 1 1 1 4 68 0000000000 RPS MWD OHMM39498 O0 000 O0 0 1 1 1 4 68 0000000000 RPM MWD 0HT4~39498 O0 000 O0 0 1 1 1 4 68 0000000000 RPD MWD OHMM39498 O0 000 O0 0 1 1 1 4 68 0000000000 ** DATA ** DEPT. 8948.000 ROP.MWD -999.250 FET.MWD -999.250 GR.MWD RPXX. MWD -999.250 RPX.MWD -999.250 RPS.MWD -999.250 RPM.MWD RPD.MWD -999.250 DEPT. 9000.000 ROP.MWD 17.430 FET. MWD -999.250 GR.MWD RPX~.MWD -999.250 RPX.MWD -999.250 RPS.MWD -999.250 RPM.MWD RPD.MWD -999.250 98.070 -999.250 108.490 -999.250 LIS Tape Verificat~ ~ Listing Schlumberger Alaska Computing Center lO-FEB-1998 15:55 PAGE: DEPT. 9500.000 ROP.MWD RPXX.MWD -999.250 RPX.MWD RPD.MWD -999.250 DEPT. 10000.000 ROP.MWD RPXX.MWD -999.250 RPX.MWD RPD.MWD -999.250 DEPT. 10500.000 ROP.MWD RPXX.MWD 7.349 RPX.MWD RPD.MWD 8.072 DEPT. 11000.000 ROP.MWD RPXX.MWD 11.229 RPX.MWD RPD.MWD 13.580 DEPT. 11500.000 ROP.MWD RPXX. MWD 9.841 RPX.MWD RPD.MWD 10.979 DEPT. 12000.000 ROP.MWD RPXX.MWD 6.309 RPX.MWD RPD.MWD 8.145 DEPT. 12500.000 ROP.MWD RPXX.MWD 4.589 RPX. MWD RPD.MWD 4.740 DEPT. 13000. 000 ROP.MWD RPXX. MWD 3. 768 RPX. MWD RPD. MWD 3. 932 DEPT. 13151.000 ROP.MWD RPXX. MWD -999.250 RPX.MWD RPD.MWD -999.250 1205.550 FET.MWD -999.250 -999.250 RPS.MWD -999.250 46.650 FET.MWD -999.250 -999.250 RPS.MWD -999.250 42.453 FET.MWD 7.587 RPS.MWD 125.007 FET.MWD 12.362 RPS.MWD 82.575 FET. MWD 10.472 RPS.MWD 28. 213 FET. MWD 7. 021 RPS. MWD 204. 015 FET.MWD 4. 816 RPS.MWD 95.266 FET.MWD 3. 904 RPS.MWD 2.314 7. 813 0.603 13.121 1.367 10.951 0.389 7.554 2. 172 4. 950 1.150 4. 012 33.092 FET.MWD -999.250 -999.250 RPS.MWD -999.250 GR. MWD RPM.MWD GR. MWD RPM. MWD GR. MWD RPM.MWD GR. MWD RPM. MWD GR. MWD RPM. MWD GR. MWD RPM. MWD GR. MWD RPM. MWD GR. MWD RPM. MWD GR. MWD RPM.MWD 49. 963 - 999. 250 54.150 -999.250 42.064 7.981 21.032 13.447 58.077 11.093 38. 283 7. 890 40.085 4.896 22.993 4.015 -999.250 -999.250 ** END OF DATA ** **** FILE TRAILER **** FILE NAME : EDIT .001 SERVICE · FLIC VERSION : O01CO1 DATE : 98/02/10 MAX REC SIZE : 1024 FILE TYPE : LO I~ST FILE : LIS Tape Verificat~v.~ Listing Schlumberger Alaska Computing Center lO-FEB-1998 15:55 PAGE: **** FILE HEADER **** FILE NAME : EDIT .002 SERVICE · FLIC VERSION : O01CO1 DATE : 98/02/10 MAX REC SIZE : 1024 FILE TYPE : LO LAST FILE : FILE H~ER FILE 1V-UYZ~ER 2 RAW MWD Curves and log header data for each bit run in separate files. BIT RUN NUMBER: 1 DEPTH INCREMENT: O. 5000 FILE SUMMARY VENDOR TOOL CODE START DEPTH STOP DEPTH 8947.5 10169.0 LOG HEADER DATA DATE LOGGED: SOFTWARE: SURFACE SOFTWARE VERSION: DOWNHOLE SOFTWARE VERSION: DATA TYPE (MEMORY or REAL-TIME): TD DRILLER (FT) : TOP LOG INTERVAL (FT) : BOTTOM LOG INTERVAL (FT) : BIT ROTATING SPEED (RPM) : HOLE INCLINATION (DEG) MINIMUM ANGLE: MAXIMUM ANGLE: TOOL STRING (TOP TO BOTTOM) VENDOR TOOL CODE TOOL TYPE GR GAS~IA RAY $ BOREHOLE AND CASING DATA OPEN HOLE BIT SIZE (IN): DRILLERS CASING DEPTH (FT) : BOREHOLE CONDITIONS MUD TYPE: MUD DENSITY (LB/G): MUD VISCOSITY (S) : MUD PH: MUD CHLORIDES (PPM) : 21 -MAR-97 5.OB 8X5-538 REAL-TIME 13150.0 8948.0 13150.0 20 30.0 82.7 TOOL lVTJMBER ........... M-10 MWD GR 8.500 3066.0 QUIKDRIL 10.80 75.0 LIS Tape Verificat .... Listing Schlumberger Alaska Computing Center lO-FEB-1998 15:55 PAGE: FLUID LOSS (C3): RESISTIVITY (OHMM) AT TEMPERATURE (DEGF) : MUD AT MEASURED TEMPERATURE (MT): MUD AT MAX CIRCULATIONG TEMPERATURE : MUD FILTRATE AT (MT): MUD CAKE AT (MT): NEUTRON TOOL MATRIX: MATRIX DENSITY: HOLE CORRECTION (IN): TOOL STANDOFF (IN): EWR FREQUENCY (HZ): REMARKS: MWD GR RUN FROM 8948' TO 10205' ARC5 RUN lO205' TO TD IN TWO BIT RUNS RUN2 BIT TO GR:40.58'; TO RES:35.7' RUN3 BIT TO GR:36.39'; TO RES:31.47' $ LIS FORMAT DATA 2.150 70.0 ** DATA FORMAT SPECIFICATION RECORD ** ** SET TYPE - 64EB ** TYPE REPR CODE VALUE 1 66 0 2 66 0 3 73 12 4 66 255 5 66 6 73 7 65 8 68 0.5 9 65 FT 11 66 85 12 68 13 66 0 14 65 FT 15 66 68 16 66 1 0 66 1 LIS Tape Verificat .... Listing Schlumberger Alaska Computing Center lO-FEB-1998 15:55 PAGE: ** SET TYPE - CHAN ** NAME SERV UNIT SERVICE API API API API FILE NUMB NUMB SIZE REPR PROCESS ID ORDER # LOG TYPE CLASS MOD NUMB SAMP ELEM CODE (HEX) DEPT FT 39498 O0 000 O0 0 2 1 1 4 68 0000000000 ROP5 LW1 F/HR 39498 O0 000 O0 0 2 1 1 4 68 0000000000 GR LW1 GAPI 39498 O0 000 O0 0 2 1 1 4 68 0000000000 ** DATA ** DEPT. 8947.500 ROPS.LW1 -999.250 GR.LW1 96.860 DEPT. 9000. 000 ROPS.LW1 17. 430 GR.LW1 108. 490 DEPT. 9500. 000 ROP5. LW1 1205. 550 GR. LW1 49. 963 DEPT. 10000.000 ROPS.LW1 46.650 GR.LW1 54.150 DEPT. 10165. 000 ROPS.LW1 35. 670 GR.LW1 47. 860 ** END OF DATA ** **** FILE TRAILER **** FILE NAME : EDIT .002 SERVICE · FLIC VERSION ' O01CO1 DATE : 98/02/10 MAX REC SIZE : 1024 FILE TYPE : LO LAST FILE : **** FILE HEADER **** FILE NAME : EDIT .003 SERVICE : FLIC VERSION : O01CO1 DATE : 98/02/10 MAX REC SIZE : 1024 FILE TYPE : LO LAST FILE : FILE HEADER FILE NU19~ER 3 RAW MWD Curves and log header data for each bit run in separate files. BIT RUN NUMBER: 2 LIS Tape Verificat~_. Listing Schlumberger Alaska Computing Center lO-FEB-1998 15:55 PAGE: LOG HEADER DATA DEPTH INCREMENT: 0.5000 FILE SU~4MAR Y VENDOR TOOL CODE START DEPTH 10169.0 DATE LOGGED: SOFTWARE: SURFACE SOFTWARE VERSION: DOWNHOLE SOFTWARE VERSION: DATA TYPE (MEMORY or REAL-TIME): TD DRILLER (FT) : TOP LOG INTERVAL (FT) : BOTTOM LOG INTERVAL (FT) : BIT ROTATING SPEED (RPM) : HOLE INCLINATION (DEG) MINIMUM ANGLE: MAXIMUM ANGLE: TOOL STRING (TOP TO BOTTOM) VENDOR TOOL CODE TOOL TYPE ARC5 RESIST./GR $ STOP DEPTH .......... 12027.0 21 -MAR-97 5.OB 8X5-538 MEMORY 13150.0 8948.0 13150.0 60 85.4 87.1 TOOL NUMBER ........... ARC-5 063 BOREHOLE AND CASING DATA OPEN HOLE BIT SIZE (IN) DRILLERS CASING DEPTH (FT) 8.500 3066.0 BOREHOLE CONDITIONS MUD TYPE: MUD DENSITY (LB/G): MUD VISCOSITY (S) '. MUD PH: MUD CHLORIDES (PPM) : FLUID LOSS (C3): RESISTIVITY (OI~4M) AT TEMPERATURE (DEGF) : MUD AT MEASURED TEMPERATURE (MT): MUD AT MAX CIRCULATIONG TEMPERATURE : MUD FILTRATE AT (MT): MUD CAKE AT (MT): QUIKDRIL 10.80 75.0 2.150 NEUTRON TOOL MATRIX: MATRIX DENSITY: HOLE CORRECTION (IN): TOOL STANDOFF (IN): EWR FREQUENCY (HZ): 20000 REMARKS: MWD GR RUN FROM 8948' TO 10205' ARC5 RUN lO205' TO TD IN TWO BIT RUNS 70.0 LIS Tape Verificat~__ Listing Schlumberger Alaska Computing Center lO-FEB-1998 15:55 PAGE: RUN2 BIT TO GR:40.58'; TO RES:35.7' RUN3 BIT TO GR:36.39'; TO RES:31.47' $ LIS FORMAT DATA ** DATA FORMAT SPECIFICATION RECORD ** ** SET TYPE - 64EB ** TYPE REPR CODE VALUE 1 66 0 2 66 0 3 73 32 4 66 255 5 66 6 73 7 65 8 68 0.5 9 65 FT 11 66 32 12 68 13 66 0 14 65 FT 15 66 68 16 66 1 0 66 1 ** SET TYPE - CHAN ** NAME SERV UNIT SERVICE API API API API FILE NUMB NUMB SIZE REPR PROCESS ID ORDER # LOG TYPE CLASS MOD NUMB SAMP ELEM CODE (HEX) DEPT FT 39498 O0 000 O0 0 3 1 1 4 68 0000000000 TAB LW2 HR 39498 O0 000 O0 0 3 1 1 4 68 0000000000 GR LW2 GAPI 39498 O0 000 O0 0 3 1 1 4 68 0000000000 PIOH LW2 010~439498 O0 000 O0 0 3 1 1 4 68 0000000000 P16H LW2 OH~4M39498 O0 000 O0 0 3 1 1 4 68 0000000000 P22H LW2 0H~0139498 O0 000 O0 0 3 1 1 4 68 0000000000 P28H LW2 OH~M39498 O0 000 O0 0 3 1 1 4 68 0000000000 P34H LW2 0t0~439498 O0 000 O0 0 3 1 1 4 68 0000000000 ** DATA ** DEPT. 10168.500 TAB.LW2 O. 022 GR.LW2 18. 618 PiOH. LW2 P16H.LW2 0.200 P22H.LW2 0.300 P28H. LW2 0.500 P34H.LW2 0.100 1000.000 LIS Tape Verificat~_ _ Listing Schlumberger Alaska Computing Center lO-FEB-1998 15:55 PAGE 10 DEPT. 10500. 000 TAB. LW2 P16H. LW2 7.587 P22H. LW2 DEPT. 11000. 000 TAB. LW2 P16H. LW2 12.362 P22H.LW2 DEPT. 11500. 000 TAB. LW2 P16H. LW2 10. 472 P22H. LW2 DEPT. 12000. 000 TAB. LW2 P16H. LW2 6. 649 P22H. LW2 DEPT. 12027. 500 TAB. LW2 P16H. LW2 6. 649 P22H. LW2 2.314 GR. LW2 7. 813 P28H. LW2 O. 603 GR. LW2 13 . 121 P28H. LW2 1.367 GR. LW2 10. 951 P28H. LW2 2. 665 GR. LW2 7.309 P28H. LW2 2. 665 GR. LW2 7. 309 P28H. LW2 42. 064 PiOH. LW2 7. 981 P34H. LW2 21. 032 P1 OH. LW2 13.447 P34H. LW2 58. 077 PiOH. LW2 11. 093 P34H.LW2 17. 418 PIOH. LW2 7.462 P34H. LW2 17.418 PIOH.LW2 7. 462 P34H. LW2 7.349 8. 072 11.229 13.580 9.841 10.979 5. 586 7.536 5.586 7.536 ** END OF DATA ** **** FILE TRAILER **** FILE NAME : EDIT .003 SERVICE : FLIC VERSION ' O01CO1 DATE : 98/02/10 MAX REC SIZE : 1024 FILE TYPE : LO LAST FILE : **** FILE HEADER **** FILE NA~ZE : EDIT .004 SERVICE : FLIC VERSION . O01CO1 DATE : 98/02/10 MAX REC SIZE : 1024 FILE TYPE : LO LAST FILE : FILE HEADER FILE ~ER 4 RAW MWD Curves and log header data for each bit run in separate files. BIT RUN NUMBER: 3 DEPTH INCRE~NT: O. 5000 FILE SU~4~2ARY VENDOR TOOL CODE START DEPTH STOP DEPTH MWD 11954.0 13151.0 $ LIS Tape Verification_ Listing Schlumberger Alaska Computing Cen~er lO-FEB-1998 15:55 PAGE: 11 LOG HEADER DATA DATE LOGGED: SOFTVWARE : SURFACE SOFTWARE VERSION: DOWNHOLE SOFTWARE VERSION: DATA TYPE (MEMORY or REAL-TIME): TD DRILLER (FT) : TOP LOG INTERVAL (FT) : BOTTOM LOG INTERVAL (FT) : BIT ROTATING SPEED (RPM) : HOLE INCLINATION (DEG) MINIMUM ANGLE: MAXIMUM ANGLE: TOOL STRING (TOP TO BOTTOM) VENDOR TOOL CODE TOOL TYPE ARC5 RESIST./GR $ BOREHOLE AND CASING DATA OPEN HOLE BIT SIZE (IN): DRILLERS CASING DEPTH (FT) : BOREHOLE CONDITIONS MUD TYPE: MUD DENSITY (LB/G): MUD VISCOSITY (S) : MUD PH: MUD CHLORIDES (PPM) : FLUID LOSS (C3): RESISTIVITY (Oh?4M) AT TEMPERATURE (DEGF) : MUD AT MEASURED TEMPERATURE (MT): MUD AT MAX CIRCULATIONG TEMPERATURE : MUD FILTRATE AT (MT): MUD CAKE AT (MT): NEUTRON TOOL MATRIX: MATRIX DENSITY: HOLE CORRECTION (IN): TOOL STANDOFF (IN) EWR FREQUENCY (HZ) REMARKS: MWD GR RUN FROM 8948' TO 10205' ARC5 RUN 10205' TO TD IN TWO BIT RUNS RUN 2 BIT TO GR:40.58'; TO RES:35.7' RUN 3 BIT TO GR:36.39'; TO RES:31.47' $ LIS FORMAT DATA 21-MAR-97 5.OB 8X5-538 MEMORY 13150.0 8948.0 13150.0 6O 87.1 92.8 TOOL NUMBER ARC-5 063 8.500 3066.0 QUIKDRIL 10.80 75.0 2. 150 70.0 20000 LIS Tape Verificat~__ Listing Schlumberger Alaska Computing Center lO-FEB-1998 15:55 PAGE: 12 ** DATA FORMAT SPECIFICATION RECORD ** ** SET TYPE - 64EB ** TYPE REPR CODE VALUE I 66 0 2 66 0 3 73 32 4 66 255 5 66 6 73 7 65 8 68 0.5 9 65 FT 11 66 32 12 68 13 66 0 14 65 FT 15 66 68 16 66 1 0 66 1 ** SET TYPE - CHAN ** NA2ViE SERV UNIT SERVICE API API API API FILE NUMB NUMB SIZE REPR PROCESS ID ORDER # LOG TYPE CLASS MOD ~JMB S~P ELEM CODE (HEX) DEPT FT 39498 O0 000 O0 0 4 1 1 4 68 0000000000 TAB LW3 HR 39498 O0 000 O0 0 4 1 1 4 68 0000000000 GR LW3 GAPI 39498 O0 000 O0 0 4 1 1 4 68 0000000000 PIOH LW3 OH~ff~39498 O0 000 O0 0 4 1 1 4 68 0000000000 P16H LW3 OH~4M39498 O0 000 O0 0 4 1 1 4 68 0000000000 P22H LW3 OH~M39498 O0 000 O0 0 4 1 1 4 68 0000000000 P28H LW3 OH~M39498 O0 000 O0 0 4 1 1 4 68 0000000000 P34H LW3 OH~ff439498 O0 000 O0 0 4 1 1 4 68 0000000000 ** DATA ** DEPT. 11954.000 TAB.LW3 0.114 GR.LW3 22.466 PIOH. LW3 P16H. LW3 5. 869 P22H. LW3 6. 269 P28H. LW3 6. 506 P34H. LW3 DEPT. 12000. 000 TAB. LW3 O. 389 GR. LW3 38. 283 P1 OH. LW3 P16H. LW3 7. 021 P22H. LW3 7. 554 P28H.LW3 7. 890 P34H.LW3 DEPT. 12500. 000 TAB.LW3 2. 172 GR.LW3 40. 085 PiOH.LW3 P16H. LW3 4. 816 P22H.LW3 4. 950 P28H. LW3 4 . 896 P34H.LW3 5.400 6. 614 6.309 8.145 4. 589 4. 740 LIS Tape Verificat~,_ Listing Schlumberger Alaska Computing Center lO-FEB-1998 15:55 PAGE: 13 DEPT. 13000. 000 TAB. LW3 P16H. LW3 3.904 P22H. LW3 DEPT. 13151. 000 TAB. LW3 P16H. LW3 3. 948 P22H.LW3 1. 150 GR. LW3 4. 012 P28H. LW3 2. 092 GR. LW3 4. 284 P28H. LW3 22. 993 P1 OH. LW3 4. 015 P34H. LW3 23.833 P1 OH. LW3 4.469 P34H.LW3 3. 768 3. 932 3.500 4. 625 ** END OF DATA ** **** FILE TRAILER **** FILE NA~E : EDIT .004 SERVICE : FLIC VERSION : O01CO1 DATE : 98/02/10 MAX REC SIZE : 1024 FILE TYPE : LO LAST FILE : **** TAPE TRAILER **** SERVICE NAME : EDIT DATE : 98/02/10 ORIGIN : FLIC TAPE NAME : 97164 CONTINUATION # .. 1 PREVIOUS TAPE : CONk4ENT : B.P. EXPLORATION, PRUDHOE BAY S-44, API #50-029-22735-00 **** REEL TRAILER **** SERVICE NAME : EDIT DATE : 98/02/10 ORIGIN : FLIC REEL NAME : 97164 CONTINUATION # : PREVIOUS REEL : CO~IENT : B.P. EXPLORATION, PRUDHOE BAY S-44, API #50-029-22735-00