Department of Commerce, Community, and Economic Development
Alaska Oil and Gas Conservation
Commission
HOME
EVENTS
DATA
Data List
Drilling
Production
Orders
Data Miner
Document Search
REPORTS
Reports and Charts
Pool Statistics
FORMS
LINKS
Links
Test Notification
Data Requests
Regulations
Industry Guidance Bulletins
How to Apply
ABOUT US
History
Staff
HELP
Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
210-128
New Plugback Esets 7/18/2024 Well Name API Number PTD Number ESet Number Date 09-44A PB1 50-029-22087-70-00 209-157 T39240 6-11-2010 15-27A PB1 50-029-22243-70-00 210-023 T39241 8-11-2010 17-09A PB1 50-029-20617-70-00 209-160 T39242 5-10-2010 18-10C PB1 50-029-20818-72-00 210-112 T39243 1-10-2011 G-30C PB1 50-029-21613-70-00 209-151 T39244 7-26-2010 K-10C PB1 50-029-21762-73-00 210-128 T39245 8-24-2011 M-17AL1 PB1 50-029-20627-70-00 211-086 T39246 3-30-2012 M-38A PB1 50-029-22519-70-00 201-132 T39247 2-22-2006 S-106 PB1 50-029-22999-70-00 201-012 T39248 2-22-2006 Z-113 PB1 50-029-23450-70-00 211-084 T39249 12-1-2011 K-10C PB1 50-029-21762-73-00 210-128 T39245 8-24-2011 ' STATE OF ALASKA RECEIVED ALASKA OIL AND GAS CONSERVATION COMMISSION JAN j 6 2015 WELL COMPLETION OR RECOMPLETION REPORT AND LOG,. 1 a. Well Status: ❑Oil ❑Gas ❑SPLUG 0 Other ®Abandoned 0 Suspended 1 b. Well Class aCC - 20AAC 25 105 2OAAC 25110 0 Exploratory 0 Stratigraphic ❑ GINJ ❑WINJ 0 WAG ❑WDSPL 0 Other No.of Completions Zero • ® Development 0 Service 2. Operator Name: 5. Date Comp.,Susp.,yr Aband.: 12. Permit to Drill Number: BP Exploration (Alaska) Inc. 12/26/2014 • 210-128 • 314-627 3. Address: 6. Date Spudded: 13. API Number: P.O. Box 196612,Anchorage,Alaska 99519-6612 6/1/2011 50-029-21762-04-00 4a. Location of Well(Governmental Section): 7. Date T.D. Reached: 14. Well Name and Number: Surface: 7/1/2011 PBU K-10C 2007' FNL,462' FWL, Sec. 04,T11N, R14E, UM • 8. KB(ft above MSL): 66.39' 15. Field/Pool(s) Top of Productive Horizon: 4865' FNL, 4432' FWL, Sec. 04,T11N, R14E, UM GL(ft above MSL): 25.53' Prudhoe Bay Field/Prudhoe Bay • Total Depth: 9. Plug Back Depth(MD+TVD) Oil Pool 575' FNL, 2550' FWL, Sec. 10, T11N, R14E, UM 12750' ' 8726' 4b. Location of Well(State Base Plane Coordinates,NAD 10.Total Depth(MD+TVD) 16. Property Designation: Surface: x- 670732 • y- 5975196 - Zone- ASP4 14943' ' 8641' - ADL 028303 TPI: x- 674773 y 5972431 Zone ASP4 11.SSSV Depth(MD+TVD) 17. Land Use Permit: Total Depth:x- 678196 y- 5971522 Zone- ASP4 None 18. Directional Survey: ❑Yes ® No 19.Water depth,if offshore: 20. Thickness of Permafrost(TVD): (Submit electronic and printed information per 20 AAC 25.050) N/A ft MSL 1900' (Approx.) 21. Logs Obtained (List all logs here and submit electronic and printed information per 20 AAC 25.071): 22. Re-Drill/Lateral Top Window MD/TVD: DIR, GR, RES, PWD, NEU, DEN 3265' - 3261' 23. CASING, LINER AND CEMENTING RECORD SETTING DEPTH MD SETTING DEPTH TVD HOLE AMOUNT CASING WT. PER FT. GRADE TOP BOTTOM TOP BOTTOM SIZE CEMENTING RECORD PULLED 20" 32' 112' 32' 112' 8 cu yds Concrete 13-3/8" 72# S-95/L-80 32' 2694' 32' 2694' 17-1/2" 1860 cu ft AS III, 1860 cu ft AS II 9-5/8" 47# L-80 28' 3265' 28' 3261' 12-1/4" 1973 cu ft Class'G' 7" 26# L-80 3109' 10276' 3108' 8198' 8-1/2" 303 cu ft Class'G' 4-1/2" 12.6# L-80 10098' 14941' 8039' 8642' 6-1/8" 989 cu ft Class'G' 24. Open to production or injection? ❑Yes ® No 25. TUBING RECORD If Yes, list each interval open SIZE DEPTH SET(MD) PACKER SET(MD/ (MD+TVD of Top&Bottom;Perforation Size and Number): TVD) 74661.4 jer.A 4-1/2", 12.6#, 13Cr-85 10106' 9984'/7937' A A t4 z ,c - '_,1J' ✓ 26. ACID, FRACTURE,CEMENT SQUEEZE, ETC. ' VZ '� • WAS HYDRAULIC FRACTURING USED DURING COMPLETION?❑Yes ®No VEy...,'3 ,__. DEPTH INTERVAL(MD) AMOUNT AND KIND OF MATERIAL USED SCANNED FEB 2 0 2015;` "`"•''• 12750' Set Whipstock 27. PRODUCTION TEST Date First Production Method of Operation(Flowing,Gas Lift,etc Not on Production N/A Date of Test Hours Tested Production For OIL-BBL: GAS-MCF: WATER-BBL: CHOKE SIZE: GAS-OIL RATIO: Test Period Flow Tubing Casing Press: Calculated OIL-BBL: GAS-MCF: WATER-BBL: OIL GRAVITY-API(CORR): Press. 24-Hour Rate 28. CORE DATA Conventional Core(s)Acquired? ❑Yes ® No . Sidewall Core(s)Acquired? ❑Yes ® No If Yes to either question, list formations and intervals cored(MD+TVD of top and bottom of each),and summarize lithology and presence of oil,gas or water (submit separate sheets with this form, if needed). Submit detailed descriptions,core chips, photographs and laboratory analytical results per 20 AAC 250.071. None Form 10-407 Revised 10/2012 CONTINUED ON REVS SE ,••"...i.-' '/5' Submit Original Only V YTS 2lc/�5 / ��'� o %� RBDMS JAN 2 1 2015 G 29. GEOLOGIC MARKERS(List all formations ar rkers encounter 30. FORMATION TESTS NAME ,.,J ND Well Tested? ,J Yes ®No • Permafrost Top If yes,list intervals and formations tested,briefly summarizing test Permafrost Base results Attach separate sheets to this form,if needed,and submit detailed test information per 20 AAC 25.071. Ugnu 4759' 4681' None West Sak 7032' 6002' Coleville Mudstone 7780' 6390' HRZ 9644' 7632' Base of HRZ/LCU 9864' 7829' Sag River 10284' 8205' Shublik 10338' 8253' Sadlerochit-Zone 4B 10412' 8314' CGL-Zone 3 10539' 8409' Base of CGL-Zone 2C 10615' 8459' 23SB-Zone 2B 10703' 8510' 22TS 10784' 8545' 21TS-Zone 2A 10939' 8605' Zone 1B 11135' 8684' TDF-Zone 1A 11385' 8739' Zone 1B(From Base) 14732' 8669' Formation at Total Depth: 31.List of Attachment: Summary of Pre-Rig Work,Summary of Daily Drilling Reports,Well Schematic Diagram 32.I hereby certify that the foregoing is true and correct to the best of my knowledge. Contact: Zach Browning,564-5220 Email. Zachary.Browning@bp.com Printed Name: Joe Lastufka Title: Drilling Technologist Signature: Phone 564-4091 Date 1/1(//1 5 INSTRUCTIONS General: This form is designed for submitting a complete and correct well completion report and log on all types of lands and leases in Alaska. Submit a well schematic diagram with each 10-407 well completion report and 10-404 well sundry report when the downhole well design is changed Item 1 a: Classification of Service Wells: Gas Injection,Water Injection,Water-Alternating-Gas Injection,Salt Water Disposal,Water Supply for Injection, Observation,or Other. Multiple completion is defined as a well producing from more than one pool with production from each pool completely segregated. Each segregated pool is a completion. Item 4b. TPI(Top of Producing Interval). Item 8: The Kelly Bushing and Ground Level elevation in feet above mean sea level. Use same as reference for depth measurements given in other spaces on this form and in any attachments. Item 13. The API number reported to AOGCC must be 14 digits(ex: 50-029-20123-00-00). Item 20. Report true vertical thickness of permafrost in Box 20. Provide MD and ND for the top and base of permafrost in Box 28. Item 23: Attached supplemental records for this well should show the details of any multiple stage cementing and the location of the cementing tool Item 24: If this well is completed for separate production from more than one interval(multiple completion),so state in item 1,and in item 23 show the producing intervals for only the interval reported in item 26. (Submit a separate form for each additional interval to be separately produced, showing the data pertinent to such interval). Item 27: Method of Operation: Flowing,Gas Lift,Rod Pump,Hydraulic Pump,Submersible,Water Injection,Gas Injection,Shut-In,or Other(explain). Item 28: Provide a listing of intervals cored and the corresponding formations,and a brief description in this box. Submit detailed description and analytical laboratory information required by 20 AAC 25 071. Item 30: Provide a listing of intervals tested and the corresponding formation,and a brief summary in this box. Submit detailed test and analytical laboratory information required by 20 AAC 25.071. Form 10-407 Revised 10/2012 Submit Original Only K-10C, Well History (Pre-Rig Sidetrack) Date Summary 12/16/14 CTU#3 w/1.75" CT(CTV=30.6). Objective-Pre-CTD Mill XN/Dummy WS Drift. RU. MU Baker LH milling assembly with 3.80"diamond parabolic mill and 3.80" SR. Kill well by bullheading 5 bbl 60/40 spear followed by 290 bbl Slick 1% KCL w/Safelube.Tag XN at 10078'and mill out easily in 45 min. Backream thru and dry drift. Continue drift run in hole to 12950'w/no wt loss. POH. RIH w/BTT dummy WS drift w/no wt loss to 12950'. POH. FP w/22 bbl 60/40 methanol/water. Begin rig down. 12/17/14 CTU#3 w/ 1.75"CT(CTV=30.6). Objective-Pre-CTD Mill XN/Dummy WS Drift. RDMO. 12/22/14 T/I/O=Vac/0/0. Set 4" H plug TWC#427. RU Test Spool#1.Torqued Flanges to API Specs. PT'd Tree. Final T/I/O TWC/0/0. Page 1 of 1 • North America-ALASKA-BP Page 1 oto Operation Summary Report Common Well Name:K-10 AFE No Event Type:RE-ENTER-ONSHORE(RON) Start Date:12/23/2014 I End Date:1/6/2015 X3-016CW:(2,748,469.00) Project:Prudhoe Bay Site:PB K Pad Rig Name/No.:NORDIC 2 Spud Date/me:4/24/2001 12:00:OOAM Rig Release: Rig Contractor.NORDIC CALISTA UWI:500292176200 Active datum:K 10C @66.39usft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth ! Phase I Description of Operations (hr) (usft) 12/23/2014 107:30 - 08:30 1.00 MOB P PRE PJSM AND BACK OFF WELL -BACK OFF WELL WITH WSL,NORDIC SUPERINTENDANT&NORDIC TOOL PUSHER -STAGE RIG ON PAD -PU RIG MATS/CLEAN AROUND WELL NOTIFICATION GIVEN TO AOGCC FOR BOPE TEST -TIME REQUEST SUBMITTED:17:07 HRS 12/22/2014 -REQUESTED TIME OF INSPECTION:00:00 HRS 12/24/2014 -REQUEST SUBMITTED BY JESSIE WALKER 08:30 - 14:30 6.00 MOB P PRE RIG MOVE FROM F-PAD TO K-PAD -MOVE SATELLITE/RIG OFFICE TO K-PAD -MOVE DOWN ACCESS ROAD TO SPINE -LEFT ON SPINE ROAD TO K PAD ROAD 14:30 - 15:30 1.00 MOB P PRE SET RIG MATS AROUND WELL 15:30 - 16:30 1.00 MOB P PRE PJSM AND PULL OVER WELL -PULL OVER WELLAND SET DOWN -ACCEPT RIG AT 16:30 ON 12/23/2014 16:30 - 18:30 2.00 MOB P PRE REMOVE TREE CAP LEAK TIGHT TEST WELL BARRIERS -ND TREE CAP 18:30 - 19:30 1.00 MOB ` P PRE SPOT REEL UNDER REEL HOUSE -PREPARE TO PU REEL 19:30 - 20:30 1.00 MOB P PRE PICK UP REEL&SECURE IN REEL HOUSE. 20:30 - 00:00 3.50 BOPSUR P PRE NU BOP EQUIPMENT -INSPECT 1502 UNION CONNECTIONS -RIG UP REEL IN REEL HOUSE -SPOT ANCILLARY EQUIPMENT -RU TIGER TANK 12/24/2014 00:00 - 00:30 0.50 BOPSUR P PRE SHELL TEST BOPE -FILL BOP STACK WITH WATER -SHELL TEST BOPE 250/4000(PASSED) Printed 1/6/2015 5:03:58PM North America-ALASKA-BP Page 2,A8d Operation SummaryReport p p Common Well Name:K-10 AFE No Event Type:RE-ENTER-ONSHORE(RON) Start Date:12/23/2014 End Date:1/6/2015 •X3-016CW:(2,748,469.00) Project:Prudhoe Bay Site:PB K Pad Rig Name/No.:NORDIC 2 Spud Date/Time:4/24/2001 12:00:00AM Rig Release: Rig Contractor:NORDIC CALISTA UWI:500292176200 Active datum:K-10C 66.39usft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (usft) 00:30 - 07:30 7.00 BOPSUR P PRE PJSM AND TEST BOPE STATE GIVEN NOTIFICATION OF BOPE TEST 12/22/2014 17:07 STATE INSPECTOR JOHN CRISP WAIVE WITNESS 12/23/2014 17:07 PRESSURE TEST ALL BOP EQUIPMENT AS PER AOGCC REGS,SUNDRY#210-128,AND CRT-AK-10-45 -TEST BOPE TO 250/3500 PSI FOR 5/5 CHARTED MIN -TEST CHOKE VALVES,CHOKE AND KILL HCR VALVES,INSIDE MANUAL VALVES ON CHOKE AND KILL LINES,BOP RAMS AND ANNULAR •PREVENTER -LOWER 2"PIPE RAMS TESTED WITH 2" TEST JOINT -2-3/8"PIPE RAMS TESTED WITH 2-3/8"TEST JOINT -UPPPER 2"PIPE RAMS TESTED WITH 2" TEST JOINT BLIND RAMS TESTED ON OPEN HOLE ANNULAR TESTED WITH BOTH 2"AND 2-3/8" TEST JOINT TEST FULL OPENING SAFETY VALVE -FUNCTION BOPE FROM BOTH REMOTE PANELS -TEST GAS ALARMS -PERFORM DRAW DOWN TEST OF ACCUMULATOR -ALL TESTS WITNESSED BY TOOLPUSHER -NO FAILURES 07:30 - 09:30 2.00 BOPSUR P PRE PULL COIL ACROSS TO INJECTOR -PREPARE REEL FOR COIL PULL OVER INSTALL GRAPPLE ON REEL/PULL TEST -PULL COIL OVER TO INJECTOR 09:30 - 12:30 3.00 BOPSUR P PRE INSTALL SLB COIL CONNECTOR -PULL/PRESSURE TEST COIL CONNECTOR -TEST E-LINE(GOOD) -HEAD-UP WITH BHI FILL REEL WITH KCL 12:30 - 13:30 1.00 BOPSUR P PRE PRESSURE TEST INNER REEL/PACK-OFF -TEST 250 LOW/3500 HIGH(LEAKING) -RE-TIGHTED CONNECTION ON BULKHEAD -RE-TEST(LEAKING) -RE-TIGHTEN CONNECTION ON BULKHEAD -BULLHEAD CONTINUES TO LEAK. 13:30 - 16:00 2.50 BOPSUR N SFAL PRE REPAIR BULKHEAD LEAK -CHANGE OUT PACKING SEALS IN BULKHEAD 16:00 - 16:30 0.50 BOPSUR N SFAL PRE PERFORMED RIG EVAC/MAN DOWN DRILLS HELD AAR FOR EVAC DRILL 16:30 - 18:30 2.00 BOPSUR N SFAL PRE CONTINUE WITH BULLHEAD REPAIRS -INSTALLED NEW BULKHEAD PACK-OFFS -CIRCULATE TO TEST FOR LEAKS -WAIT ON LOCK TITE TO CURE 18:30 - 19:00 0.50 BOPSUR P PRE PJSM,PU INJECTOR,PULL CHECKS FROM UQC TO TEST IRV AND PACKOFFS,REPLACE INJECTOR PACKOFFS Printed 1/6/2015 5:03:58PM • North America-ALASKA-BP Page 3 ofa¢t. Operation Summary Report Common Well Name:K-10 AFE No Event Type:RE-ENTER-ONSHORE(RON) Start Date:12/23/2014 End Date:1/6/2015 X3-016CW:(2,748.469.00) Project:Prudhoe Bay Site:PB K Pad Rig Name/No.:NORDIC 2 Spud Date/Time:4/24/2001 12:00:00AM Rig Release: Rig Contractor:NORDIC CALISTA UWI:500292176200 Active datum:K 10C©66.39usft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (usft) 19:00 - 20:00 1.00 BOPSUR P PRE PERFORM RIG EVAC/FIRE DRILL WITH MR -TIMELY CREW RESPONSE INCLUDING CH2 TRUCKING SUPPORT DRIVERS -DISCUSS MUSTER LOCATIONS AND RESPONSE TO FIRE PAST INCIPIENT STAGE 20:00 - 22:00 2.00 BOPSUR P PRE PJSM AND TEST INNER REEL VALVE AND PACKOFFS •-PU INJECTOR AND GET ON STUMP -PRESS TEST IRV AND PACKOFFS TO 250/3500 PSI -POP OFF,INSTALL CHECKS IN UQC -PRESS TEST CTC AND UQC TO 250/3500 PSI ,-PRESS TEST CHECKS TO 250/3500 PSI 22:00 - 23:30 1.50 BOPSUR P PRE PJSM AND RIG UP LUBRICATOR -PICK LUBRICATOR UP BEAVER SLIDE -MAKE UP EXTENSIONS AND STAB LUBRICATOR FLOOD LUBRICATOR&STACK WITH MEOH -PRESS TEST TO 250/3500 PSI 23:30 - 00:00 0.50 BOPSUR P PRE PJSM AND PULL TWC -OPEN MASTER,SWAB,AND SSV TO TESTED LUBRICATOR -PULL TWC,WELL ON VAC -CLOSE MASTER AND SWAB 12/25/2014 00:00 - 01:00 1.00 BOPSUR P PRE PJSM AND RIG DOWN LUBRICATOR -BREAK OFF LUBRICATOR -LOWER DOWN BEAVER SLIDE -CLEAR RIG FLOOR 01:00 - 04:00 3.00 BOPSUR P PRE PJSM AND BULLHEAD KILL WELL -PU INJECTOR AND GET ON WELL -SHELL TEST LUBRICATOR X-OVER TO 250/3500 PSI -OPEN MASTER AND SWAB,WELL ON VAC -BULLHEAD 5 BBLS MEOH -BULLHEAD 330 BBLS 1%KCL AT 5.1 BPM AND 1280 PSI MAX WHP -BULLHEAD 220 BBLS 9.5 PPG MUD AT 5.0 BPM AND 1400 PSI MAX WHP 04:00 - 04:30 0.50 BOPSUR P PRE PERFORM 30 MIN EXTENDED FLOWCHECK, WELL ON VAC -FILL HOLE,STATIC LOSS RATE 20-25 BBUHR 04:30 - 06:30 2.00 WHIP P WEXIT PJSM AND MU WHIPSTOCK ASSEMBLY -POP OFF,BREAK OFF STINGER AND NOZZLE -RE-TEST E-LINE CONNECTION,GOOD TEST -WSL VERIFY SHEAR PINS AND NUT ON WS I-PU WS AND WS SETTING TOOL •-PU 3"COILTRAK -GET ON WELL,PRESS TEST QTS 06:30 - 12:30 6.00 WHIP P WEXIT RIH WITH KB PACKER WHIPSTOCK -BPM IN/OUT:0.42/0.25 CIRC PSI:692 -MW IN/OUT:9.46 PPG/9.45 PPG -IA/OA/PVT:7/9/157 -LOG TIE-IN(+3')DEPTH CORRECTION -RIH TO SECOND GEO TIE-IN(-3') CORRECTION -LOG CCL ACROSS WS SETTING DEPTH Printed 1/6/2015 5:03:58PM North America-ALASKA-BP Page 4,9tCia, Operation Summary Report Common Well Name:K-10 AFE No Event Type:RE-ENTER-ONSHORE(RON) Start Date:12/23/2014 End Date: 1/6/2015 X3-016CW:(2,748,469.00) Project:Prudhoe Bay Site:PB K Pad Rig Name/No.:NORDIC 2 Spud Date/Time:4/24/2001 12:00:00AM Rig Release: Rig Contractor:NORDIC CALISTA UW:500292176200 Active datum:K-10C @66.39usft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (usft) 12:30 - 13:00 0.50 WHIP P WEXIT SET WHIPSTOCK PER BOT PROCEDURES -BASE OF WS DEPTH:12,764.4'MD -TOP OF WS DEPTH:12,750'MD -PRESSURE UP TO 2800 PSI(SET WS) -SET DOWN 3K WOB(NO MOVEMENT) 13:00 - 16:00 3.00 WHIP P WEXIT POOH F/12,750'MD -BPM IN/OUT:1.04/0.65 CIRC PSI:1095 -MW IN/OUT:9.46 PPG/9.45 PPG -FLOW CHECK AT SURFACE(NO FLOW) 16:00 - 17:00 1.00 STWHIP P WEXIT CHANGE BHA -LD WHIPSTOCK RUNNING TOOLS -MU MILLING BHA GUAGE MILL-3.81 GO 3.80 NOGO -GUAGE STRING MILL-3.80 GO 3.79 NOGO -PRESSURE TEST QTS 17:00 - 19:00 2.00 STWHIP P WEXIT RIH WITH MILLING ASSEMBLY 90'/MIN WITH 1.2711.78 BPM IN/OUT CIRC PSI:1249 -MW IN/OUT:9.46 PPG/9.45 PPG -IA/OA/PVT:7/9/125 -HARD TAG AT 10,226'MD AND CANNOT GET PAST. -PICK UP 30'.CLEAN PICK UP,NO DRAG. 19:00 - 20:00 1.00 STWHIP N DPRB 10,226.00 WEXIT ATTEMPT TO WORK PAST 10,226'MD OBSTRUCTION -CLOSE EDC AND ATTEMPT TO ROTATE MILLS THRU. -2.67/2.67 BPM IN/OUT WITH 2900 PSI. -RIH AND STACK DOWN 10K#SURFACE WT. NO DOWNHOLE WOB OR MOTOR WORK. -REAM UP TO 9920'MD WITH 2.5 BPM. -RIH BACK TO 10,226'MD CANNOT GET PAST. 20:00 - 21:30 1.50 STWHIP N DPRB 10,226.00 WEXIT CONTINUE WORKING PAST OBSTRUCTION AT 10,226'MD -MAKE NOTIFICATION TO SUPERINTENDENT. -AGREE TO POOH 1000'AND ATTEMPT TO WORK PAST. -POOH TO 9200'MD PUMPING 1.5 BPM WITH CLOSED EDC.TRIP CLEAN. -RIH FROM 9200'MD PUMPING 1.5 BPM WITH CLOSED EDC.TRIP SMOOTH. -RIH BACK TO 10,226'MD CANNOT GET PAST. -STACK DOWN 20K#SURFACE Wt.NO DOWNHOLE WOB OR MOTOR WORK. 21:30 - 23:30 2.00 STWHIP N DPRB 10,226.00 WEXIT POOH TO INSPECT BHA -MAKE NOTIFICATION TO SUPERINTENDENT AND ODE. -AGREE TO POOH AND INSPECT BHA. -POOH FROM 10,226'MD. -70'/MIN WITH 2.50/2.12 BPM IN/OUT WITH CLOSED EDC. -FLOWCHECK ON SURFACE,NO FLOW 23:30 - 00:00 0.50 STWHIP N DPRB 10,226.00 WEXIT PJSM AND INSPECT BHA -POP OFF.INSPECT CTC AND LQC,NO VISIBLE WEAR. -STAND BACK INJECTOR. LD 3"COILTRAK,NO VISIBLE WEAR. -LD 2 JTS 2-3/8"PH6,NO VISIBLE WEAR. -INSPECT MOTOR AND MILLS.MILLS IN GAGE.NO WEAR. Printed 1/6/2015 5:03:58PM a North America-ALASKA-BP Page 5 of$9' Operation Summary Report Common Well Name:K-10 AFE No Event Type:RE-ENTER-ONSHORE(RON) Start Date:12/23/2014 End Date:1/6/2015 X3-016CW:(2,748,469.00) Project:Prudhoe Bay Site:PB K Pad Rig Name/No.:NORDIC 2 Spud Date/Time:4/24/2001 12:00:00AM Rig Release: Rig Contractor:NORDIC CALISTA UWI:500292176200 Active datum:K-10C @66.39usft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (usft) 12/26/2014 00:00 - 00:30 0.50 STWHIP N DPRB 10,226.00 WEXIT -CALL AND NOTIFY ODE.NO WEAR OR SCARRING FOUND ON BHA. -AGREE TO PICK UP MILLING ASSEMBLY WITH 1 JT 2-3/8"PH6 AND RE-ATTEMPT RIH. 00:30 - 01:00 0.50 STWHIP N DPRB 10,226.00 WEXIT PJSM AND PU MILLING ASSEMLBY ' -PU 1 JT PH6 WITH MOTOR AND MILLS. -PU 3"COILTRAK. GET ON WELL.PRESS TEST QTS. 01:00 - 02:30 1.50 STWHIP N DPRB 10,226.00 WEXIT RIH WITH MILLING ASSEMBLY -100'/MIN WITH 0.43/0.98 BPM IN/OUT THRU OPEN EDC I-PASS BY 10,226'MD NO PROBLEM 02:30 - 04:00 1.50 STWHIP P WEXIT CONTINUE RIH FROM 10,226'MD ' 1-90'/MIN WITH 0.42/0.90 BPM IN/OUT -TIE-IN TO TOP OF SAG RIVER WITH-2.5' CORRECTION TIE-IN TO FORMATION AT 12,640'WITH-3.5' CORRECTION -CONTINUE RIH.DRY TAG WHIPSTOCK AT ' 12,751'MD. -PU,CLOSE EDC,BRING PUMPS UP TO 2.80 ,BPM. I-RIH AND TAG WHIPSTOCK AT 12,750'PUMPS ON. 04:00 - 06:00 2.00 STWHIP ' P ' WEXIT TIME MILL(1'/HR)WINDOW F/12,750'-12,752' 5MD 'V""' -FS:2990 PSI MTR WRK:50-150 PSI WOB - 10D -BPM IN/OUT:2.80/2.80 PVT:173 BBLS -MW IN/OUT:9.52/9.43 PPG -ECD/IA/OA:10.63 PPG/634 PSI/0 PSI 06:00 - 14:00 8.00 STWHIP . P WEXIT TIME MILL(1'/HR)WINDOW F/12,752'-12,760' MD -FS:2990 PSI MTR WRK:50-150 PSI WOB: 0.3-1.5K# -BPM IN/OUT:2.80/2.80 PVT:325 BBLS MW IN/OUT:9.52/9.43 PPG -ECD/IA/OA:10.63 PPG/634 PSI/0 PSI 14:00 - 15:00 1.00 STWHIP P WEXIT MILL NEW FORMATION F/12,760'-12,770'MD -BPM IN/OUT:2.80/2.80 CIRC PSI:3255 -MW IN/OUT:9.50 PPG/9.41 PPG -IA/OA/PVT:645 PSI/376 PSI/298 BBLS -ECD/ANN PSI: 10.64 PPG/4789 PSI 15:00 - 16:30 1.50 STWHIP P WEXIT DRESS AND DRIFT WINDOW -REAM UP ATV/MIN,THEN DOWN AND UP 3X AT 1'/MIN -DRY DRIFT WINDOW,WINDOW CLEAR -FLOW CHECK 16:30 - 19:30 3.00 STWHIP P WEXIT POOH F/12,770'MD -BPM IN/OUT:3.13/2.81 CIRC PSI:3164 -MW IN/OUT:9.50 PPG/9.43 PPG -FLOW CHECK AT SURFACE(NO FLOW) 19:30 - 20:00 0.50 STWHIP P WEXIT PJSM AND LD MILLING ASSEMBLY I POP OFF,STAND BACK INJECTOR -LD 3"COILTRACK,1 JT 2-3/8"PH6 -LD MOTOR AND MILLS -WINDOW MILL:3.80"GO,3.79"NO-GO -STRING MILL:3.80"GO,3.79"NO-GO Printed 1/6/2015 5:03:58PM r North America-ALASKA-BP Page 6 oft), Operation Summary Report Common Well Name:K-10 AFE No Event Type:RE-ENTER-ONSHORE(RON) Start Date:12/23/2014 End Date:1/6/2015 X3-016CW:(2,748,469.00) Project:Prudhoe Bay Site:PB K Pad Rig Name/No.:NORDIC 2 Spud Date/Time:4/24/2001 12:00:00AM Rig Release: Rig Contractor:NORDIC CALISTA UWI:500292176200 Active datum:K-10C©66.39usft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (usft) 20:00 - 20:30 0.50 DRILL P PROD1 PJSM AND PU DRILLING ASSEMBLY -PU MOTOR WITH 1.1 DEG AKO AND 4.25" BI-CENTER BIT -PU 3"COILTRAK WITH RESISTIVITY -GET ON WELL,PRESS TEST QTS 20:30 - 00:00 3.50 DRILL P PROD1 RIH WITH DRILLING ASSEMBLY -95'/MIN WITH 0.48/0.98 BPM IN/OUT -TIE-IN WITH-6'CORRECTION -RIH AND TAG BOTTOM AT 12,772'MD -PU AND TAKE SPR'S 12/27/2014 00:00 - 06:00 6.00 DRILL P PROD1 DRILL AHEAD F/12,752'-12,935'MD FS:2820 PSI MTR WRK:100-200 PSI WOB: 1.5-3.5K# -BPM IN/OUT:2.52/2.52 PVT:475 BELS -MW IN/OUT:9.53/9.46 PPG -ECD/IA/OA:10.67 PPG/547 PSI/325 PSI -SLOW DRILLING.SEE-5%PYRITE IN SAMPLES. 06:00 - 14:15 8.25 DRILL P PROD1 DRILL AHEAD F/12,935'-13,200'MD -FS:2886 PSI MTR WRK:100-250 PSI WOB: 1.5-3.5K# -BPM IN/OUT:2.55/2.51 PVT:482-442 BBLS -MW IN/OUT:9.55/9.50 PPG -ECD/IA/OA:10.73 PPG/710 PSI/505 PSI -FORMATION TOOK-20 BBL AT 13,000'MD -3-5 BBUHR LOSSES AFTER 13,000'MD 14:15 - 15:30 1.25 DRILL P PROD1 WIPER F/13,200'-12,600'MD -BPM IN/OUT:2.58/2.43 CIRC PSI:2875 -MW IN/OUT:9.56 PPG/9.54 PPG -ECD/IA/OA:10.74/709/509 -LOG TIE-IN(+4.5')DEPTH CORRECTION 15:30 - 16:15 0.75 DRILL P PROD1 RIH F/12,600'-13,200'MD -BPM IN/OUT:2.63/2.57 CIRC PSI:2911 -MW IN/OUT:9.56 PPG/9.48 PPG .-ECD/IA/OA:10.69/619/471 16:15 - 20:30 4.25 DRILL P PROD1 DRILL AHEAD F/13,200'-13,407'MD -FS:3020 PSI MTR WRK:200-300 PSI WOB: 1.5-3.5K# -BPM IN/OUT:2.65/2.60 PVT:428-417 BBLS -MW IN/OUT:9.58/9.52 PPG -ECD/IA/OA:10.75 PPG/778 PSI/579 PSI 3-5 BBL/HR LOSSES CONTINUE 20:30 - 00:00 3.50 DRILL P PROD1 DRILL AHEAD F/13,407'-13,476'MD -FS:3020 PSI MTR WRK:100-300 PSI WOB: 2.5-4.5K# -BPM IN/OUT:2.65/2.60 PVT:417-397 BBLS -MW IN/OUT:9.58/9.53 PPG -ECD/IA/OA:10.78 PPG/217 PSI/573 PSI -BLEED IA:20 GAL FREEZE PROTECT AND GAS -SLOW DRILLING,ATTEMPT TO STEER UP THRU SHALE -3-5 BBUHR LOSSES CONTINUE Printed 1/6/2015 5:03:58PM TREE- 4-1/16" K 10 C F�+D.-� MCEVOY WH�� OY � SA. - NOTES:WELL ANGLE>70'ft 10825'•«: ACTUATOR= BAKER C PREVIOUS W ELLBORE'S NOT SHOWN*** NiIAL KB.ELE 54.30' ( BF.ELEV= 26.38' KOP- 3200 Max Angle= 99" 14572' 20"OOi,40t1CTOR H 110' ' , 2207' H4-1/2"HES X NP,D=3.813" Datum MD= WA Datum TVD= 8800'ss 13-3/8"CSG,72#,S95/L-80,BTRS,D=12.347' I-- 2694' GAS LIFT MANDRELS ST MD ND DEV TY FE. VLV LATCH FORT DATE I i 4 2981 2981 5 /MG DMY RK 0 10/17/14 9-5/8"X 7"BKRZXPN UP/10'TIEBACK H 3109' 3 6044 5500 59 KBG2 DMY BK 0 10/17/14 &FLEX LOCK LNR HGR,D=6.21" 2 8726 6932 52 KBG2 DMY BK 0 07/11/11 1 9920 7880 26 KBG2 DMY BK 0 07/11/11 9-5/8"BKR GEN I WHIPSTOCK(05127/11) H 3265' 9-5/8"CSG,47#,L-80 NSCT,0=8.681" —3265 MLLOUT WrCOW(K-10C)3265'-3282' Minimum ID =3.725" @ 10094' 4-1/2" HES XN NIPPLE • • 9955' —14-112"Fi SXNP,D=3.813" $ g—t 9984' --{7'X 4-1/2"HES TNT PKR,D=3.856" ' 10019' —14-1/2.1-ES X NP,D=3.813" ' ' 10094' H4-112"HES XN NP,MLLED TO 3.80"(12/16/14) 10098' H7"X 5'BKR HAD ZXPN LTPw/LTP,0=4.25" 4-1/2"TBG,12.6#13CR-85 VAM TOP, — 10106' .0152 bpf,D=3.958" 10106' H4-1/2"WIEG,D=3.958" 7"LNR,26#,L-80 VAM TOP HC, —{ 10276' 10115' —I 7"X 5'BKR FLEX LOCK LNR HGR ID=4.18' .0383 bpf,D=6.276" Iiii , 10124' -15"X 4-1/7 XO,D=3.958" PERFORATION SUMMARY I REF LOG: SLB MWD GR ON 08/16/11 , ANGLE AT TOP PERF:910 @ 13330' Note:Refer b Production DB for historical perf data 12750' 4 112 VN PS'iOCK(12/25/14) SIZE SPF INTERVAL Opn/Sqz SHOT SQZ 2-7/8". 6 11860-11920 S 07/07/11 08/17/13 I 2-7/8" 6 12000-12170 S 07/07/11 08/17/13 2-7/8" 6 12280-12600 S 07/07/11 08/17/13 2-7/8' 6 12670-12820 S 07/07/11 08/17/13 2-7/8" 6 12920-13270 S 07/07/11 08/17/13 27/8" 6 13330-13 590 0 07/07/11 2-7/8' 6 13670-13710 0 07/07/11 2-7/8" 6 13780-13810 0 07/07/11 2-7/8" 6 13880-14010 0 07/07/11 ►, 14,610' --i4-1/2-CBP MA.LEE)&PUSHED(08/20/13) 2-7/8- 6 14110-14210 0 07/07111 14854' —I FETID 4-1/2'LNR 12.6#,L-80 BT-M,.0152 bpf,D=3.958" --I 14941' DATE REV BY COM ENTS DATE REV BY COMIETTS PRIDHOE BAY tNT 11/19/87 N18E INITIAL COMPLETION 09/04/13 RM-VJMD FCO&MLLED CBP(08120/13) WELL: K-10C 05/18/01 CDR-11 P&A CTD SIDETRACK 09/04/13 TJWJMD GLV GO(08/23/13) FERtIT No: 2101280 06128/01 N3ES CTD SIDETRACK(K-10A) 10/27/14 GJB/JMD GLV GO(10/17/14) AR No: 50-029-21762-04 12108/03 NORDIC 1 CTD SIDETRACK(K-10B) 11/21/14 PJC 13-3/8"/9-5/8"CSG LEDA IhS SEC 4,T11N,R14E,2007'FNL&461'FWL 07/11111 D25 SIDETRACK(K-10C) 12/16/14 ALM PJC MIL XN NPPLE 09/04/13 TAQ/JMD SET CBP&CMT SQZ(08/15/13) BP Exploration(Alaska) Image Project Well History File Cover Page XHVZE This page identifies those items that were not scanned during the initial production scanning phase. They are available in the original file, may be scanned during a special rescan activity or are viewable by direct inspection of the file. at0 - L Well History File Identifier Organizing(done) Two-sided III IIII II II I1111 ❑ Rescan Needed II 0IIIU I 01111 RES AN DIGITAL DATA OVERSIZED (Scannable) Color Items: ❑ Diskettes, No. ❑p‘eyscale Items: ❑ Other, No/Type: ❑ Other Items Scannable by a Large Scanner ❑ Poor Quality Originals: OVERSIZED (Non-Scannable) ❑ Other: ❑ Logs of various kinds: NOTES: ❑ Other:: BY: CM& Date: `,g, /s/ al P Project Proofing 001111111111 BY: Maria Date: 1 a ! /s/ 'II • Scanning Preparation - x 30 = /a 0 + 7 = TOTAL PAGES /a 7 (Count does not include cover sheet) . BY: Date: a, /s/ u Production Scannin g 11111111 I 11111 Stage 1 Page Count from Scanned File: f c U (Count does include cover sheet) Page Count Matches Number in Scanning Preparation: 'YES NO BY: Maria Date: /` ,D...1/� is! to Stage 1 If NO in stage 1, page(s)discrepancies were found: YES NO BY: Maria Date: /s/ Scanning is complete at this point unless rescanning is required. IA IIIIIIIIII ReScanned 1 III I BY: Maria Date: /s/ Comments about this file: Quality Checked I 12/22/2011 Well History File Cover Page.doc o c �� C O J u i 4 a W N O3O W W O O IS Z p �Vd w pZ pZ ij o`" >> E ���pw�paO Oa¢U� tpa Z¢ �pw� F-¢O C V ¢cc as '- '-Z ZOM J J m m3 FL" U ° H c o o H"-C a) - •> 0 0 N 0 y V N N N N ✓ O a) Q O ct N N N N N Z J CO CO CO CO CO •i3 C 1 co = O N c c c c c E ! _ = 0 a) N a) a) I-�"' Q c OU 0 0 0 0 0 U LL J c CD a p U �° ro c•- co°D o V; -C) Z oN = �J' W g , .t in N Z d N al CD M M M CO M V III W W I > � V m o 0 Z _ o ° 7 ° z F- Q ` N X Z o c a m I, ca = j O �y o 0 0 0 u_n a N cZI J 2 0 U 0 0 c Q r o_N w a, N a a)p O 0 (N (N (N (N U � 0 E J 'I J U Q 1 Y 0. 2 _Z co o 2 ' i Z m Q m I w cn o 113• - y p Q of I""' a a ° < 6 Z w .� . Y w 0 Z o > > > > > a 0 O N N w - m E -.I U) N N co c7) Z = ce w C C C c c I -y a) 0 O O O O E E 1 v .� I W jI H Z c c c c c 'a Z Ii H I w E O co 0 ^ w H Z Z DD 0 J r N a N re i _ O O W a Z d co re 0 O < `o E E E E z V z ' y ) G Z W w a1 LL J N co Z Q (.. .� c • D O y in Z aa) ° �• P3 .�+ Z W U O o N aa) aa) \ \ ci o U a >? E E p C=7 a —y rn ' a \o 0 0 'm o 3 r c aa) I I o d Q' 10 H JOH ,W J J J J 3 Q > U ¢ V 0 9 v 0 N to N. Z N N co U A I o 5 o �!II I�I! I C Z E. Q J U R c ? _ `, R J co 1 G Ce Q c 11 N 2 0. v '1 III Ce o J I a w W J U m o Z 8 r < ° d O. a co i CC G O g Na) O a N E U ; U ti J o Q ° I'''' Y 5� 0 G N /� Q W m n Ii W ''=A O m V! p Q 0 c 1 * a) a Q o a 0 Z o m 0 Z N co 03 CO CO d 0 3 N a) > d F. M Q' 81 •cc- C) a) V c 2 CC E 11 E w 0 I1 C 0. 2 „ U RECEIVED • STATE OF ALASKA SEP 0 5 2013 k JKA OIL AND GAS CONSERVATION COMM._.)ION REPORT OF SUNDRY WELL OPERATIONS AOGCC 1.Operations Abandon Lf Repair Well U Plug Perforations Li Perforate U Other U Cement Squeeze Performed: Alter Casing ❑ Pull Tubing❑ Stimulate-Frac ❑ Waiver ❑ Time Extension❑ Change Approved Program ❑ Operat.Shutdown❑ Stimulate-Other ❑ Re-enter Suspended Well❑ 2.Operator 4.Well Class Before Work: 5.Permit to Drill Number: Name: BP Exploration(Alaska),Inc Development 0 Exploratory ❑ 210-128-0 3.Address: P.O.Box 196612 Stratigraphic Service ❑ 6.API Number: Anchorage,AK 99519-6612 50-029-21762-04-00 • 7.Property Designation(Lease Number): 8.Well Name and Number: ADL0028303 PBU K-10C • 9.Logs(List logs and submit electronic and printed data per 20AAC25.071): 10.Field/Pool(s): 1 PRUDHOE BAY,PRUDHOE OIL , 11.Present Well Condition Summary: Total Depth measured 14943 feet Plugs measured 14610 feet true vertical 8641.26 feet Junk measured None feet Effective Depth measured 14610 feet Packer measured See Attachment feet true vertical 8686.42 feet true vertical See Attachment feet Casing Length Size MD TVD Burst Collapse Structural None None None None None None Conductor 80 20"Conductor 30-110 30-110 0 0 Surface 1813 13-3/8"72#L-80 29-1842 29-1841.95 4930 2670 Intermediate None None None None None None Production 3237 9-5/8"47#L-80 28-3265 28-3261.22 6870 4760 Liner See Attachment See Attachment See Attachment See Attachment See Attachment See Attachment Perforation depth Measured depth See Attachment feet 12000-12170 feet 12280-12600 feet 12670-12820 feet 12920-13270 feet 13330-13590 feet 13670-13710 feet 13780-13810 feet 13880-14010 feet 14110-14210 feet !1 True Vertical depth See Attachment feet 8744.61-8734.09 feet 8727.35-8718.53 feet 8722.1-8727.33 feet 8727.66-8727.91 feet 8727.04-8726.76 feet 8726.67-8726.8 feet 8727.28-8727.53 feet 8728.27-8729.96 feet 8729.41-8727.83 feet Tubing(size,grade,measured and true vertical depth) 4-1/2"12.6#L-80 27-9272 27-7309.65 Packers and SSSV(type,measured and true vertical depth) See Attachment See Attachment See Attachment Packer None None None SSSV 12.Stimulation or cement squeeze summary: Intervals treated(measured): 11860'-11920', 12000'-12170',12280'-12600',12670'-12820', 12920'-13270' Treatment descriptions including volumes used and final pressure: 355BBLS ORGANOSEAL,5OBBLS SQUEEZECRETE, 1OBBLS 12%HCL i 13. Representative Daily Average Production or Injection Data Oil-Bbl Gas-Mcf Water-Bbl Casing Pressure Tubing Pressure Prior to well operation: 261 25836 9 0 2167 Subsequent to operation: 803 13447 42 0 1087 14.Attachments: 15.Well Class after work: Copies of Logs and Surveys Run Explorator,❑ Development 0 - Service❑ Stratigraphic ❑ Daily Report of Well Operations X 16.Well Status after work: Oil U, Gas L] WDSPLJ GSTOR ❑ WINJ ❑ WAG ❑ GINJ ❑ SUSP ❑ SPLUG❑ 17.I hereby certify that the foregoing is true and correct to the best of my knowledge. Sundry Number or N/A if C.O.Exempt: N/A ',I Contact Nita Summerhays Email Nita.Summerhayst BP.com Printed Name Nita Summerhays Title Petrotechnical Data Technician -nor/ Signature / ,_ ���/ =■•■-- Phone 564-4035 Date 9/5/2013 /ic!� ABBIVIS SEP - 9 ki Form 10-404 Revised 10/2012 Submit Original Only Daily Report of Well Operations ADL0028303 T/I/0=25071/0 Temp=Sl. Injectivity Test(Pre Acid) Pumped 5 bbls of 75*60/40 down Tbg followed by 220 bbls of 100*crude to fluid pack well. Pumped 2.5 bbls of crude down Tbg at .5 bpm and got an injection pressure of 204 psi. Pumped 5 bbls crude at 1 bpm and got an injection pressure of 219 psi. Pumped 10 bbls crude ©2 bpm and got an injection rate of 279 psi. Pumped 15 bbls of crude at 3 bpm and got an injection pressure of 358 psi. Pumped 20 bbls crude at 4 bpm and got an injection pressure of 460 psi. Pumped a total of 287 crude down Tbg. DSO notified of well status per LRS depature. 8/1/2013 FWHP's=320/5/0 SV,WV=C SSV,MV=O CV's=OTG ***CONT FROM 7/31/13 WSR***(cement squeeze) DRIFT W/3.50" CENT, 3.00" S-BAILER TO DEV @ 11,284' SLM. 8/1/2013 ***WELL LEFT S/I ON DEPARTURE*** 1.75"CTUI#9 ACTive Coil Tubing Perform swap to Active coil tubing 8/12/2013 «<Complete>>> CTU #9 1.75 Active Coil Tubing. GSO OrganoSeal and SqueezeCRETE/CBP. MIRU. 8/13/2013 «<Job in Progress>>> CTU#9 1.75" Active Coil Tubing. GSO OrganoSeal and SqueezeCRETE/CBP. «<Job continued from 8/13/13>>> Drifted to 14250' ctm. Fluid packed well with 310 bbls 100°F 1% KCI with EOC @ 14250'. Performed Step Rate Injection test at: 1 bpm whp 0, bhp 3730, bht 183, 2 bpm whp 137, bhp 3887, bht 183, 3 bpm whp 387, bhp 4089, bht 183, 4 bpm whp 653, bhp 4271, bht 183. Performed 3 hour DTS Temperature warm back survey after pumping 383 bbls 100°F 1% KCI. Jetted 40 bbls 12% HCI 2 passes from 11800' to 14210' then jetted 100 bbls 1% KCI 2 passes 11800'-14210'. Pumped 200 bbls 100°F 1% kcl with EOC @ 14240', performed 3 hour DTS Temperature warm back survey. 8/14/2013 «<Job in Progress>>> CTU #9 1.75"ACTive Coil Tubing -Job Scope = Drift/Acidize/Set CBP/Organoseal Squeeze «<Job continued from 8/14/13>>> RIH w/WOT 4.5" Composite Bridge Plug. Tied into SLB memory GR/CCL 29 June 2012 and set the plug at 13300' elm COE. RIH w/SLB 2.5" BDN. Pick up weights at 25K. PUH to 10000' to swap coil over to diesel. Perform post plug injectivity down coil backside with 1%KCL w/safelube. 4 bpm @ 595#, 3 bpm @ 506#, 2 bpm @ 340#, 1 bpm @ 97#. Cementers mixed up Organoseal (23:00) Started pumping Organoseal at 4 bpm. 8/15/2013 <<<Job continued on 08-16-13 WSR>>> CTU#9 1.75"Active Coil (CV=30.9) Job Objective: GSO, Organoseal/Squeezecrete Finish pumping a total of 355 bbls of Organoseal down coil backside. Washed down to CBP @ 13300. Lay in Squeeze Crete to WCTOC 10200'. Squeeze cement in 500 psi increments up to 3000 psi (total 4.5 bbls behind pipe). Dropped 5/8" ball and washed out cement to CBP @ 13300'. Lay in powervis pill upto 11700'. POOH circulating 1% slick KCI and FP w/ 50/50. Trapped 500#on well. At surface. 5/8" ball recovered. Currently performing weekly BOPE test 8/16/2013 *** Job cont'd on 08-17-13 WSR *** Daily Report of Well Operations ADL0028303 -CTU#9 1.75"Active Coil (CV=30.9) Continue with weekly BOPE test, Cement in equalizing ports. Pump slack management, Change packoffs and chain inspection while SCE rep cleaned equalizing ports. Performed successful weekly BOPE test. RDMO 8/17/2013 «Job Complete» T/I/0=222/9/0 I emp=S/I MI T-T to 1500 PSI, PASSED (Post organoseg) pumped 1.3 bbls MEOH to test. 1st 15 min TBGP lost 51 &2nd 15 min TBGP lost 12 for a total TBGP loss of 63 in 30 min. Bled back— 1.3 bbls. FWHP's=141/10/0 Upon departure DSO notified-SSV 8/19/2013 & horse trailer VLV's=S/I IAV,OAV=OTG tag hung CTU 8 w/ 1.75" CT. Scope; Mill composite plug, post organo seal cmt sqz. Rig up. Function test BOP's. RIH w/ BHA; 3.13" ctc, dfcv, 3.15"jars, 3.35"disco, 3.12"circ sub, 3.14" motor, 3.11"crossover, 3.7"4 blade mill (oal=25.59'). Tag 6033 bring pump online at min rate got past. Tagged at 7178' cement stringers. Tagged at 10704' seeing some motor work"cement stringers" Seeing good motor work at 13290'. Appears we milled CBP seen loss of WH psi. keep milling and pushing CBP to TD. ***Job cont'd on li 8/19/2013 WSR 08-20-2013*** on inue• rom ' • 6:- •- • U : w . . cope; Y r compose e p ug, post organo seal cmt sqz. Milled CBP, keep milling with powervis sweeps and pushing CBP to TD saw little motor work. Pushed CBP 14610" POOH chase @ 80%. See over pulls on CT while pooh at 80 %. at these depths 13559', 13567', 13512', 13333', 13155', 13040', 12390', may be a cement chunks off tubing wall. Bottoms up, gel at surface returns look clean. Freeze protect tubing with 38 bbls of 50/50 meth. ***Job complete*** 8/20/2013 ***WELL S/I ON ARRIVAL****(cement squeeze) RIG UP SWCP#05 TO SET GENERIC GLV DESIGN 8/22/2013 ***JOB CONTINUED ON 8/23/13*** ***JOB CONTINUED FROM 8/22/13****(cement squeeze) RAN 4-1/2" SS CATCHER S/D @ 6014' SLM RAN 3.79" CENT, 3.79" LIB, S/D @ 6016' SLM, 2 SMALL MARKS ON EDGE & SHINY RING AROUND METAL SIDE OF LIB. RAN 3.625" CENT, 3.50" LIB, SD @ 6017' SLM, JAR DOWN 5 TIMES & FELL THROUGH, SD @ 6217' SLM, POOH, PULL HEAVY THROUGH 6090'-6020' SLM. SMALL METAL SHAVINGS COME BACK IN LEAD. RAN 4-1/2" BRUSH, 3.74" G-RING, BRUSH UP & DOWN TBG FROM 6000'-6400' SLM RAN 4-1/2" BRUSH, 3.805" G-RING, BRUSH UP & DOWN TBG FROM 6000'-6400' SLM SET 4-1/2" SLIP STOP CATCHER @ 6116' SLM. PULL ST#3 FROM 6019' SLM, 6044' MD. PULL ST#4 FROM 2954' SLM, 2981' MD. SET ST#4 @ 2954' SLM, 2981' MD. SET ST#3 @ 6019' SLM, 6044' MD. PULL EMPTY CATCHER @ 6116' SLM. 8/23/2013 ***JOB COMPLETE, WELL TURNED OVER TO DSO*** FLUIDS PUMPED BBLS 5 60/40 METH Daily Report of Well Operations ADL0028303 287 CRUDE 608 1%KCL 10 12%HCL 133 SAFELUBE 355 ORGANOSEAL 206 FRESH WATER 119 DIESEL WITH 2%LUBE 776 50 SQUEEZECRETE 163 POWERVIS 953 1%KCL WITH SAFELUBE 74 METH 1 DIESEL 2964 TOTAL m a, r- OMMT- COOMCOM to O to M CD N- U) CA OD P.' rn v Co r: c eCD r- r,- o� V' MA- NCV CV � NNCV o N- r- o- r- r- r- 00 r- r- r- o CC) OD OD OD OD CO OD CO CO a W Z N W o O a0 ; o N 1L rY I- N - 0 CO No N- op N- - 0 U W Its r- op . O O CO N N V' d d U Z tr CD co N N N N N N N J W ? -i o r- N- r- - r` r- r` ti r- r- 0 -J -J J o J a co co co 00 co co co co co co = o o a W a w w z p z 0 t~i) cn cn co co m w m 1 0 0 0 0 0 0 0 0 0 0 4'' ++ N 0) '- O N NMA NOOON 0 T- N N N M M M M NI- NI- .c 2 = FU- O d J d C) 0 c o c o c o co co zM a Q co o Y 0 0 0 0 0 0 0 0 0 0 ! J d OO A N I N M 0 D 0OO T- O T-a G N N N M C) M 0) Nr co a- 0 2 t G) a 0 U c N N N N N a a a d d ea0000a. . a. aa. aCOCncnO) CI) mmm 0 a, d a cO r- 0 QCo co co co co co co co 01,01 0 0 0 0 0 0 0 0 0 0 0 0 0 J ZQ W O NNNNNNNNN'CV a W W W ~ N N N N N W J N N Li_ 0 w w ry W gooUUOOOOODUOO ° > > a a CO rL ri a C(O a w m E m 2! 000000U000 0000000000 a 0 J WU' O w a YYYYYYYYYY m W LL co co a rr Perforation Attachment ADL0028303 SW Name Operation Date Peri Operation Code Meas Depth Top Meas Depth Base TVD Depth Top K-10C 8/17/2013 SQZ 11860 11920 8752.72 K-10C 8/17/2013 SQZ 12000 12170 8744.61 K-10C 8/17/2013 SQZ 12280 12600 8727.35 K-10C 8/17/2013 SQZ 12670 12820 8722.1 K-10C 8/17/2013 SQZ 12920 13270 8727.66 K-10C 8/20/2013 BPP 13330 13590 8727.04 K-10C 8/20/2013 BPP 13670 13710 8726.67 K-10C 8/20/2013 BPP 13780 13810 8727.28 K-10C 8/20/2013 BPP 13880 14010 8728.27 K-10C 8/20/2013 BPP 14110 14210 8729.41 BPS BRIDGE PLUG SET OH OPEN HOLE FCO FILL CLEAN OUT STC STRADDLE PACK,CLC FIL FILL STO STRADDLE PACK, OP SQF SQUEEZE FAILED SPS SAND PLUG SET SQZ SQUEEZE SL SLOTTED LINER PER PERF SPR SAND PLUG REMOVE[ RPF REPERF TVD Depth Base 8749.57 8734.09 8718.53 8727.33 8727.91 8726.76 8726.8 8727.53 8729.96 8727.83 )SED EN II w Ocoocoo) 0000O ° O C 1 CO N IS V �+ 0 0 0 0 co 0 o0 Ca NMCCOOCOd' CCO m r r r • CO N M N N O CO to O 1.0 N CA CO s- Cr) O) CA N '- O CO O (00000NCOM CO CON- N- CO M •- N II llllll COMMNN Co CO CAtOCO OCAt, MMOcO0) - M O CO to C+) N N N O N CO O Cr) N- N. N- CO O � NO � mvt0NN N M N co CO CO , O � 000o NCON r CA 0) M CA 02 _ - M O CON MONCNO8NNN = O M CA CA O) O Q O ICI ` p 00 C0 00 CO Cp co 1-.3 CO J J J J J J J N 88 * * * .-CrOMN C NU V, O) o � ,N N CO 5._ LibiNEoNco C? � I • N M N O I I , +' ►C) •--• N C CO .- . N I CO N CO N J N V- Cr) O CC Z O Q U V OWWWWWOu_ Z Z W W W W W O t m O Z Z Z Z Z W O O U J J J J J 0_ V) H Packers and SSV's Attachment ADL0028303 SW Name Type MD TVD Depscription K-10C PACKER 3109 3041.26_ 7" Baker ZXP Top Packer K-10C PACKER 9984 7870.59 4-1/2" HES TNT Perm Packer K-10C PACKER 10098 7972.44 5" Baker ZXP Top Packer I TREE= • 4-1/16'CAN — ACfli ACTUATOR BAKER K-1 OC ORK�NAL,"A"AND"BASIDDETRACKS@NOT25"•• ACTUATOR= BAKER C NT1AL KB.Eli 54.30' SHOWN BELOW 9-5/8"WHIPSTOCK Q 3265'••' BF.EiEV= 26.38' [I KOP= 3200' / , Max Angle= 99°@ 14572 220T H4-1/2"HES X NP,D=3.813' Datum MD= WA 120"CONDUCTOR H 110' Datum TV D= 8800'ss 13-3/8"CSG,72#,S95/L-80,MRS,D=12.347' H 2694' GAS LFT MANDRELS ST M) TV D 0EV TYPE VLV LATCH PORT CATE I. 4 2981 2981 5 MMG DOME RK 16 08/23/13 9-5/8"X 7"BKR ZXRJ LTP w/10'TE BACK H 3109' 3 6044 5500 13 &FLEX LOCK LM HGR 13=6.21' 2 8726 6932 52 59 KBG2 KBG2 DMSO Y BK BK 20 0 07/11/11 08/23/ 1 0086°4472026 920 7880 265529 6 KBG2 DMY BK 0 07/11/11 9-5/8"BKR GR'I 1 WI-*'STOCK(05/27/11) H 3265' 1 9-5/8"CSG,47#,L-80,D=8.681' H -3265 \ MLLOUT WIDOW(1410C)3265'-3282' Minimum ID =3.725" @ 10094' 4-112" HES XN NIPPLE ' ' 9955' H4-112"HES X NP,D=3.813" yL" 9984' H7"X 4-1/2"FES TNT PKR D=3.856" 10019' H4-1/2"HES X NIP,D=3.813' ' I I 10094' H4-1/2"FES XN NIP,D=3.725' 4-1/2"TBG,12.6#13CR-85 VAM TOP, H 10106' .0152 bpf,121=3.958" 10098' H7"x 5'BKR HRD ZXF• LTP w/LTP,D=4.25" 7"LNR,26#,L-80 VAM TOP HC, —I 10276' Ill 10106' H4-1/2"WLEG,D=3.958" .0383 bpf,D=6.276" 10115' Hr x 5"BKR FLEX LOCK LNR HGR,D=4.18" \ 10124' S'X 4-1/2'XO,D=3.958" PERFORATION SU MARY I H F LOG: SLB MIND GR ON 08/16/11 , ANGLE AT TOP PE RF:91°@ 13330' , Note:Refer to Production DB for historical perf data ' SIZE SPF INTERVAL Opn/Sqz SHOT SOZ 2-7/8' 6 11860-11920 ' S 07/07/11 08/17/13 2-7/8" 6 12000-12170 S 07/07/11 08/17/13 , 2-7/8" 6 12280-12600 S 07/07/11 08/17/13 , 2-7/8" 6 12670-12820 S 07/07/11 08/17/13 2-7/8' 6 12920-13270 S 07/07/11 08/17/13 I 2-7/8" 6 13330-13590 0 07/07/11 ' 2-7/8' 6 13670-13710 0 07/07/11 , 2-7/8" 6 13780-13810 0 07/07/11 2-7/8" 6 13880-14010 0 07/07/11 1 2-7/8" 6 14110-14210 0 07/07/11 ' 14610' H4-1/2'CBP MLLE37&PUSHED(08/20/13) I ♦•4 14854' —I 111) 4-1/2"LNR,12.6#,L-80 BT-M,.0152 bpf,D=3.958' H 14941' ►."i DATE REV BY COMMENTS DATE REV BY COMETS 1 PRUDHOE BAY UNIT 11/19/87 NI BE IMTTAL COMPLETION 09/04/13 F I-KIND FCO&MLLED CBP(08/20/13) WE1L: K-10C 05/18/01 CDR-11 P&A CTD SIDETRACK 09/04/13 TJWJMD GLV C/O(08/23/13) PERMIT No:'t101280 06128/01 N3E5 CTD SIDETRACK(K-10A) AR No: 50-029-21762-04 12/08/03 NORDIC 1 CTD SIDETRACK(K-10B) SEC 4,T11 N,R14E,2007'FTL&461'FWL 07/11111 1325 SIDETRACK(K-10C) 09/04/13 TAO/JMD SET CBP&CMT SOZ(08/15/13) BP BcpIoration(Alaska) Yv71., N 0 To- 0 NI -, \ I I 1 1 1 1 1 1 C"' 0 to 1-. 0) 00) .-. gi '''.11 -h,' 0000000000000000 0000000000000000 ... • . . . . . ,-- ,- ,-- ,- ,- ,,- . . . . . i..3) 0 co C.) -_, ,c2 o -t-.) ,_ 6' co .--,..1 erlf- v.- o tIZ .-- Oo , , 0 ' •,, E2 F PEI (%) uin ZE-4PA : Itn D -.., Z cu I-7 M C '11 0 8 .02 V... 4t tkO = Ln f7WM ' :IL. 6 , r13 E CD .-.... e , CI •t- ■- •t- ■- ,- csi %- .,. .- a-, . >, 0 ' cr!,, mmmoc) 1"Inom wl-rItl° A i, ' -.I ,..,.% IA x-.• r.'" a) ...., c• to el , 1.... J. _,., ,... ti) 04 ri3 V) 0 (Du c (-0 ce 0 0 ° J Www 0 I- WO Z 1- 00W 01(7% r4 Z 9 o 0 mxm _ — LL c L 0 — un cOCCI 0.. ini.1.1 0 C4 -; I- < Z • CI 1.11 U- z0 2u_ 01(7) 0MY0w __I Op ° < w , t4.. W20W02 ,, 1— Ce 0` ti.i > "- 0 0- ILLJ ILI 0- ILI LLI > ZO. UX 1- i 0- i 0 0 V_ 0- L° 0 •-4,, 2 ' > L?1 >- =, >- el- >- >- 0 >- 0 >- 7 >. 51.J '"'k; Ct CO re it Ce Ct Ce re cn u_ o ¢ 0 u_ r 01- 0 00 0 0m0 $00 s' mLLE2E29, 292 (pw22 < ce I -- E f11 N 6. S.-its) a, in 41,) — 0 uo N WI CLIZ L.O. XXXXXXXXXXXXXXXX < Ce at- 1 41. E t al CA 1E t... mm ,„ nrcom .4. 04 0 , 41) .S CC 0 """ - an " n 4‘1' (7, " A 4,1 en ea eme ' 1..-I r4 ID 6-, .- a a ‘- G c° G 2: G .,...,.-21:1 00 . . .. ...,.. , 6 .. a --, 4 = 00c .0 P• I 1 °0. , 0 U ■ U N • l•-• ''''" r.1 CI — co co < Co 0 ,to 0 an CO .4. s.- an N N a) c0 , a -.. mA myloomomomom000mm w war, c o OD -0 In 0 . 1141. tiLtcpt..4 v.,- > 01 •••+ 62 ..... ro Ea' oll ma- 0 tael w , amul00o.g . T40 ,..1, 03 < < 9 %- m f■J Si a, 412 'Y, I 4014; 20c49cloclOrDeq (ocletN01 (00 ;:s ... .ecc ,„ c — In LU _c tel CI writ t-s4 a, ra,,,,L, 1 aJ ct. 0 C >< E17mm e CL) ; C;) O �, V/ 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 ■ U Ci �-. p L "a U y z r r o 0 CU V 0 p a _ ,_I o Pcs Q; A U I c O U ro [ m r r r ; CA — LIl WW N pl L O ►vC -i 0? ° ° E H Q V, — i CE) Q c do `' N N N N N N N N N N N N N N N N N N CO... N G.,N 03 - ro C c C �, Q :� 7 7 7 = 7 7 7 3 , 5 , 3 _ 7 O 3 = 7 5 -_ N O v Cl N . i V )," to N O Q) N M 4Y Cy A M Q `- a, O O Cfl O Oa M .7 f� o U . J N U C ..�. a N . N arr. N N N r X _ o Q �5 J U F Z F- I- F- Z CL AV '� E 0 _O 0 O O O O Z LL 2 I- 2 CJ 2 2 V d O C7 W O _U' 0 w p~, Z a ?r W Z I- § ICU- ii-,a C) LL LL LL 0 LL LL O LL W LL u_ 0 .., re cc ce Q cc ce _1 CL CL CL '' O J m a m a 0 CL 0. 0 a w a a w a a a w I ce a a J a J a a ce a a a J ed r Cl- r >- r >- r >- r CL >- >- >- r CL _ CL CL CL CL CL 2 CL 0 CC LL LL LL CC OC CY O' 0 OIL 0 0 0 0 0 0 0 E 2 2 2 2 2 2 2 O 0 12 J CLOC Cr 2 E 2 2 lL O 0 O O FO w a w w w w w w w IL p r w LLa a a w 0 w w E a 2 2 2 2 2 2 2 a a = 2x a a a E cn 22 _Si N 0 a O N M Q T6 ° N b1 ii Li] Z •`3 `XX X X X X X X X X X X X X X X X X X X X X ¢j0 Q 1- Ln y CD CI J e t:*i u _ _ t0 , t0 COD a6) N c CC N N M r tO CO t0 nr N N N O v co w W ill O M O `0 0 0 0 Q 0 0 0 0 0 0 0 0 z::, 0 0 C>r OC 0 0 0 00 >- C �. eC 0 0 0 0a ® 0 0 0 0 ® O D n . _ O r © 0 0 $ 0 0 7 ® ® c� 0 ,t. 0 en Cn 0 7 7 v a .a. o n `$ 2 O O D © X X X 2 ono co C>= Cn >- m 00 CIr DM -o I- p ° -I aC c) co Q to to to to Q N N N 0 >- > a a U Q Q a) o0 M m 00 t0 0 CO 0 0 0 D C) CO U 00 00 00 all .. Q Q CO Om CO C 0 u m ° .7 _> rn ro O N Cn N Ql fo v) N X O I M M i c-i C Q a_ d Q - J to C3 CO N Q < B Cn O t cs C� sn O , N ca" Q m Q O N G.) v .Q .O 2 La Oa 0 0 t0 N M N O O O O O N r N N M '-' cc O d0 v = w to N O O r N O O Cn Cn r v- N s- J aJ co Z co E Z 0 W 0 Y > RI i 0 2 a a D a J J Z 0 ,. C7 N aJ u m O L O .� --1 l7 O O .'.`.:� 22 ro L 4 Y = a N v t°_.� aJ a_ 0 c al N D en § N Q X d m (T Q WELL DATA TRANSMITTAL To: State of Alaska August 18, 2011 Alaska Oil and Gas Conservation Commission Attn.: Howard Okland 333 West 7th Avenue,Suite 100 Anchorage,Alaska 99501-3539 RE: LWD Formation Evaluation Logs: K-10C+PB1 AK-MW-0007640278 K-10C PB1 50-029-21762-73 2"x 5" MD Triple Combo Logs: 1 Color Log 2"x 5"TVD Triple Combo Logs: 1 Color Log" K-10C 50-029-21762-04 2"x 5" MD Triple Combo Logs: 1 Color Log - 2"x 5"TVD Triple Combo Logs: 1 Color Log-� Digital Log Images&LWDG-formatted LIS Data w/verification listing; 1 CD Rom-� PLEASE ACKNOWLEDGE RECEIPT BY SIGNING AND RETURNING ONE COPY OF THIS TRANSMITTAL LETTER TO THE BP PETROTECHNICAL DATA CENTER AND ONE COPY TO SPERRY DRILLING: Sperry Drilling BP Exploration (Alaska), Inc. Attn: Buster Bryant Petrotechnical Data Center 6900 Arctic Blvd. LR2-1 Anchorage,Alaska 99518 P. 0. Box 196612 Office: 907-273-3539 Anchorage,AK 99516-6612 Fax: 907-273-3535 Buster.Bryant @halliburton.com Date: 3 ( Signed: d • STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMMISSION WELL COMPLETION OR RECOMPLETION REPORT AND LOG 1 a. Well Status: ® Oil ❑Gas ❑SPLUG ❑Other ❑Abandoned ❑Suspended 1b. Well Class: 20AAC 25.105 20AAC 25.110 ® Development ❑Exploratory ❑GINJ ❑WINJ ❑WAG ❑WDSPL ❑Other No.of Completions One ❑ Service ❑Stratigraphic 2. Operator Name: 5.Date Comp.,Susp.,or Aband.: 12. Permit to Drill Number: BP Exploration(Alaska)Inc. 7/11/2011 210-128 • 3. Address: 6.Date Spudded: 13. API Number: P.O. Box 19661,Anchorage,Alaska 99519-6612 6/1/2011 50-029-21762-04-00 4a. Location of Well( overnmental Section): 7.Date T.D.Reached: 14. Well Name and Number: (p;l ok �.) Surface: 7/1/2011 PBU K-10C+ PB1 144) 2007'FNL,4817'FEL,SEC.04,T11N, R14E, UM 8. KB(ft above MSL): 66.39' 15.Field/Pool(s): Top of Productive Horizon: 4865'FNL, 848'FEL, SEC.04,T11N, R14E, UM GL(ft above MSL): 25.53' Prudhoe Bay Field/Prudhoe Bay Total Depth: 9.Plug Back Depth(MD+TVD): Oil Pool 575'FNL,2729'FEL, SEC. 10,T11N, R14E, UM 14853' 8653' 4b. Location of Well(State Base Plane Coordinates,NAD 27): 10.Total Depth(MD+TVD): 16. Property Designation: Surface: x- 670732 y_ 5975196 Zone- ASP4 14943' 8641' ADL 028303 TPI: x- 574773 y- 5972432 Zone- ASP4 11.SSSV Depth(MD+TVD): 17. Land Use Permit: Total Depth:x- 678196 y- 5971522 Zone- ASP4 None 18.Directional Survey: ®Yes ❑No 19.Water depth,if offshore: 20. Thickness of Permafrost(ND): (Submit electronic and printed information per 20 AAC 25.050) N/A ft MSL 1900'(Approx.) 21.Logs Obtained (List all logs here and submit electronic and printed information per 20 AAC 25.071): 22. Re-Drill/Lateral Top Window MD/TVD: Dir, GR, Res, PWD, Neu, Dens 3265' 3261' 23. CASING,LINER AND CEMENTING RECORD SETTING DEPTH MD SETTING DEPTH ND HOLE AMOUNT CASING WT.PER FT. GRADE To BOTTOM To BOTTOM SIZE CEMENTING RECORD PULLED • 20" Surface, 110' Surface 110' 8 cu vds Concrete _ 13-3/8" 72# S-95/L-80 Surface 2694' Surface 2694' 17-1/2" 1860 cu ft AS III. 1860 cu ft AS II 9-5/8" 47# L-80 Surface 3265' Surface 3261' 12-1/4" 1973 cu ft Class'G' 7" 26# L-80 3091' 10276' 3090' 8198' 8-1/2" 303 cu ft Class'G' 4-1/2" 12.6# _ L-80 10089' 14941' 8031' 8642' 6-1/8" 989 cu ft Class'G' 24. Open to production or injection? ®Yes ❑No 25. TUBING RECORD If Yes,list each interval open SIZE DEPTH SET(MD) PACKER SET(MD/ND) (MD+TVD of Top&Bottom;Perforation Size and Number): 2-7/8"gun diameter,6 SPF 4-1/2", 12.6#, 13Cr-85 10106' 9984'/7937' MD ND MD TVD 11860'-11920' 8753'-8750' 13880'-14010' 8728'-8730' 26. ACID,FRACTURE,CEMENT SQUEEZE,ETC. 12000'-12170' 8745'-8734' 14110'-14210' 8730'-8728' 12280'-12600' 8727'-8719' annul DEPTH INTERVAL(MD) AMOUNT AND KIND OF MATERIAL USED 12670'-12820' 8722'-8727' 2200' Freeze protect with 152 bbls diesel 12920'-13270' 8728'-8728' 13330'-13590' 8727'-8727' 3 t- r 13670'-13710' 8727'-8727' 13780'-13810' 8727'-8728' 27. PRODUCTION TEST Date First Production: Method of Operation(Flowing,Gas Lift,etc.): Not on Production N/A Date of Test: Hours Tested: Production For OIL-BBL: GAS-MCF: WATER-BBL: CHOKE SIZE: GAS-OIL RATIO: Test Period Flow Tubing Casing Press: Calculated OIL-BBL: GAS-MCF: WATER-BBL: OIL GRAVITY-API(CORR): Press. 24-Hour Rate 28. CORE DATA Conventional Core(s)Acquired? ❑Yes ®No Sidewall Core(s)Acquired? ❑Yes ®No If Yes to either question,list formations and intervals cored(MD+ND of top and bottom of each),and summarize lithology and presence of oil,gas or water (submit separate sheets with this form,if needed). Submit detailed descriptions,core chips,photographs and laboratory analytical results per 20 AAC 250.071. None VI �o ��%`I r 'z ti(-; (i 2 ill.' RBDMS AUG 112011 Form 10-407 Revised 12/2009 CONTINUED ON REVERSE E91a1 �1 Iii ��� Cote. �ii71fT11SS10f1 Submit Original Only ,�,{ "3•N t.rir)ynritg6 e {, G 29. GEOLOGIC MARKERS(List all formations and market_ _ncountered): 30. F ATION TESTS NAME MD TVD Well Tested? ❑Yes ®No Permafrost Top If yes,list intervals and formations tested,briefly summarizing test Permafrost Base results. Attach separate sheets to this form,if needed,and submit detailed test information per 20 MC 25.071. K-10CPB1: 3746'/3908'/4299 3720'/3877'/4254' SV3/SV2/SV1 None UG4/UG4A/ 4759'/4818' 4681'/4734' UG3/UG1 5019'/5954' 4905'/5454' WS2/WS1 7032'/7396' 6002'/6189' CM3/CM2/CM 1 7780'/8690'/9330' 6390'/6909'/7357' THRZ 9644' 7632' BHRZ 9864' 7829' LCU/TJC 9864' 7829' TJB/TJA 10053'/ 10160' 7999'/8094' `" TSGR -Sag River 10284' 8205' TSHU -Shublik 10338' 8254' TSAD/TCGL-Ivishak 10412'/ 10539' 8314'/8409' BCGL 10615' 8459' 23SB 10703' 8510' 22TS 10784' 8545' 21TS/T/Zone 2A 11032' TZ1B 8644' TDF/T/Zone 1A 11290' 8726' BSAD 11445' 8745' K-10C 11590' 8754' 21TS 10939' 8605' TDF/TDF(T/Zone 1A) 11385'/14732' 8739'/8669' Formation at Total Depth(Name): Ivishak TZ1 B ( 14732' 8669' 31.List of Attachments: Summary of Daily Drilling Reports,Well Schematic Diagram,Well History,Surveys 32.I hereby certify that the foregoing is true and correct to the best of my knowledge. �i Signed: Elizabeth Barker �, , Title: Drilling Technologist Date: is/y' .1/1 PBU K-10C+PB1 210-128 Prepared By Name/Number. Elizabeth Barker,564-5674 Well Number Permit No./Approval No. Drilling Engineer: John Rose,564-5271 INSTRUCTIONS General: This form is designed for submitting a complete and correct well completion report and log on all types of lands and leases in Alaska. Submit a well schematic diagram with each 10-407 well completion report and 10-404 well sundry report when the downhole well design is changed. Item la: Classification of Service Wells: Gas Injection,Water Injection,Water-Alternating-Gas Injection,Salt Water Disposal,Water Supply for Injection, Observation,or Other. Multiple completion is defined as a well producing from more than one pool with production from each pool completely segregated. Each segregated pool is a completion. Item 4b: TPI(Top of Producing Interval). Item 8: The Kelly Bushing and Ground Level elevation in feet above mean sea level. Use same as reference for depth measurements given in other spaces on this form and in any attachments. Item 13: The API number reported to AOGCC must be 14 digits(ex: 50-029-20123-00-00). Item 20: Report true vertical thickness of permafrost in Box 20. Provide MD and ND for the top and base of permafrost in Box 28. Item 23: Attached supplemental records for this well should show the details of any multiple stage cementing and the location of the cementing tool. Item 24: If this well is completed for separate production from more than one interval(multiple completion),so state in item 1,and in item 23 show the producing intervals for only the interval reported in item 26. (Submit a separate form for each additional interval to be separately produced, showing the data pertinent to such interval). Item 27: Method of Operation: Flowing,Gas Lift,Rod Pump,Hydraulic Pump,Submersible,Water Injection,Gas Injection,Shut-In,or Other(explain). Item 28: Provide a listing of intervals cored and the corresponding formations,and a brief description in this box. Submit detailed description and analytical laboratory information required by 20 MC 25.071. Item 30: Provide a listing of intervals tested and the corresponding formation,and a brief summary in this box. Submit detailed test and analytical laboratory information required by 20 AAC 25.071. Form 10-407 Revised 12/2009 Submit Original Only 29. GEOLOGIC MARKERS(List all formations and marke. _iicountered): 30. 1 IATION TESTS NAME MD ND Well Tested? ❑Yes ®No Permafrost Top If yes,list intervals and formations tested,briefly summarizing test Permafrost Base results. Attach separate sheets to this form,if needed,and submit detailed test information per 20 AAC 25.071. None Please see attachment Formation at Total Depth(Name): Ivishak TZ1 B 14732' 8669' 31.List of Attachments: Summary of Daily Drilling Reports,Well Schematic Diagram,Well History,Surveys 32.I hereby certify that the foregoing is true and correct to the best of my knowledge. Signed: Elizabeth Barker „ '/", -LA, Title: Drilling Technologist Date: O-/6 // PBU K-10C+PB1 210-128 Prepared By Name/Number: Elizabeth Barker, 564-5674 Well Number Permit No./Approval No. Drilling Engineer: John Rose, 564-5271 INSTRUCTIONS General: This form is designed for submitting a complete and correct well completion report and log on all types of lands and leases in Alaska. Submit a well schematic diagram with each 10-407 well completion report and 10-404 well sundry report when the downhole well design is changed. Item la: Classification of Service Wells: Gas Injection,Water Injection,Water-Alternating-Gas Injection,Salt Water Disposal,Water Supply for Injection, Observation,or Other. Multiple completion is defined as a well producing from more than one pool with production from each pool completely segregated. Each segregated pool is a completion. Item 4b: TPI(Top of Producing Interval). Item 8: The Kelly Bushing and Ground Level elevation in feet above mean sea level. Use same as reference for depth measurements given in other spaces on this form and in any attachments. Item 13: The API number reported to AOGCC must be 14 digits(ex: 50-029-20123-00-00). Item 20: Report true vertical thickness of permafrost in Box 20. Provide MD and ND for the top and base of permafrost in Box 28. Item 23: Attached supplemental records for this well should show the details of any multiple stage cementing and the location of the cementing tool. Item 24: If this well is completed for separate production from more than one interval(multiple completion),so state in item 1,and in item 23 show the producing intervals for only the interval reported in item 26. (Submit a separate form for each additional interval to be separately produced, showing the data pertinent to such interval). Item 27: Method of Operation: Flowing,Gas Lift,Rod Pump,Hydraulic Pump,Submersible,Water Injection,Gas Injection,Shut-In,or Other(explain). Item 28: Provide a listing of intervals cored and the corresponding formations,and a brief description in this box. Submit detailed description and analytical laboratory information required by 20 AAC 25.071. Item 30: Provide a listing of intervals tested and the corresponding formation,and a brief summary in this box. Submit detailed test and analytical laboratory information required by 20 AAC 25.071. Form 10-407 Revised 12/2009 Submit Original Only TREE= 4-1/16"CM/ �A/ SAFETY NO WELL ANGLE>70°@ 10825'*** WELLHEAD= MCEVOY K-1 O. ORIGINAL,"M AND"B"SIDETRACKS NOT ACTUATOR= BAKER C SHOWN BELOW 9-5/8"WHIPSTOCK @ 3265'*** KB. ELEV= 54.30' ( I BF. ELEV = 26.38' KOP= 3200' Max Angle= 99°@ 14572' I I 2207' I--14-1/2"HES X NIP, ID=3.813"1 Datum MD= 11728' 20"CONDUCTOR H 110' I Datum TVD= 8755'SS 13-3/8"CSG,72#, S95/L-80, BTRS, ID=12.347" H 2694' I GAS LIFT MANDRELS ST MD TVD DEV TYPE VLV LATCH PORT DATE 4 2981 2981 5 MMG DOME RK 16 07/24/11 9-5/8"X 7"BKR ZXPN LTP w/10'TIEBACK 3109' 1 3 6044 5500 59 KBG2 SO BK 20 07/24/11 &FLEX LOCK LNR HGR, ID=6.21" 2 8726 6932 52 KBG2 DMY BK 0 07/11/11 1 9920 7880 26 _KBG2 DMY BK 0 07/11/11 9-5/8"BKR GEN II WHIPSTOCK(05/20/11) 3265' 9-5/8"CSG,47#, L-80, ID=8.681" - -3265 I\ MILLOUT WINDOW(K-10C)3265'-3282' Minimum ID = 3.725" @ 10094' 4-1/2" HES XN NIPPLE I 9955' H4-1/2"HES X NIP,ID=3.813" I z X- 9984' -17"X 4-1/2"HES TNT PKR, ID=3.856" 1 10019' H4-1/2"HES X NIP, ID=3.813" I 1 t- 10094' H4-1/2"HES XN NIP, ID=3.725" I 4-1/2"TBG, 12.6#13CR-85 VAM TOP, H 10106' .0152 bpf, ID=3.958" 10098' H7"X 5"BKR HRD ZXPN LTPw/LTP, ID=4.25" I 7"LNR,26#,L-80 VA TOP HC, --j 10276' \ 10106' I--I4-1/2"WLEG, ID=3.958" .0383 bpf, ID=6.276" 10115' 1-17"X 5"BKR FLEX LOCK LNR HGR,ID=4.18" I PERFORATION SUMMARY 10124' H5"X 4-1/2"XO, ID=3.958" I REF LOG: ?? ■ ANGLE AT TOP PERF:93°@ 11860' Note:Refer to Production DB for historical perf data I SIZE SPF INTERVAL Opn/Sqz DATE ' 2.78" 6 11860- 11920 0 07/07/11 2.78" 6 12000- 12170 0 07/01/00 1 2.78" 6 12280- 12600 0 07/07/11 I 2.78" 6 12670- 12820 0 07/07/11 , 2.78" 6 12920- 13270 0 07/07/11 2.78" 6 13330- 13590 0 07/07/11 I 2.78" 6 13670- 13710 0 07/07/11 I 2.78" 6 13780- 13810 0 07/07/11 , 2.78" 6 13880- 14010 0 07/07/11 2.78" 6 14110- 14210 0 07/07/11 I I •♦••1 4-1/2"LNR, 12.6#,L-80 IBT-M,.0152 bpf, ID=3.958" -1 14941' 'o•.•1' ' DATE REV BY COMMENTS DATE REV BY COMMENTS PRUDHOE BAY UNIT 11/19/87 N18E INITIAL COMPLETION 07/26/11 PJC DRLG DRAFT CORRECTIONS WELL: K-10C 05/18/01 CDR-11 P&A CTD SIDETRACK 07/27/11 CJN/PJC GLV C/O(07/24/11) PERMIT No:1'2101280 06/28/01 N3ES _CTD SIDETRACK(K-10A) API No: 50-029-21762-04 12/08/03 NORDIC 1 CTD SIDETRACK(K-10B) SEC 4,T11 N, R14E,2007'FNL&461'FWL 07/11/11 D25 SIDETRACK(K-10C) 07/20/11 AJ/PJC TREE C/O BP Exploration(Alas ka) WELL NAME: K-10C + PB1 29. Geologic Markers (all formations and markers) Name MD TVD K-10CPB1 SV3 3746 3720 SV2 3908 3877 SV1 4299 4254 UG4 - UGNU 4759 4681 UG4A 4818 4734 UG3 5019 4905 UG1 5954 5454 WS2 -West Sak 7032 6002 WS1 7396 6189 CM3 - Colville Mudstone 7780 6390 CM2 8690 6909 CM1 9330 7357 HRZ top 9644 7632 HRZ base 9864 7829 LCU/TJC 9864 7829 TJB 10053 7999 TJA 10160 8094 TSGR - Sag River top 10284 8205 TSHU - Shublik top 10338 8254 TSAD - Ivishak top 10412 8314 TCGL 10539 8409 BCGL 10615 8459 23SB 10703 8510 22TS 10784 8545 21 TS -Zone 2A top 11032 8644 TZ1 B -Zone 1B top 11290 8726 TDF Zone 1A top 11445 8745 BSAD 11590 8754 K-10C Sidetrack 21 TS - Zone 2A top 10939 8605 TDF 11385 8739 TDF -Zone 1A top 14732 8669 K-10C Well History (PB1 & Sidetrack) 1 k, I v �� Date Summary perk) 29-Apr-2011 PRESSURE TEST OA AND IA.CIRCULATE OUT FREEZE PROTECT Attached lubricator, pressure tested lubricator Low: 300 psi/pass High: 3500 psi/pass. Pulled 6-3/8"CIW "J" BPV#403 thru 5' riser and dryhole tree, 1-2' ext. used...tag @ 114"...Doyon 25 moved over the well....no problems 30-Apr-2011 DISPLACE FREEZE PROTECT. RU LUBRICATOR-TEST. RUN IN TWC-TEST. NIPPLE DOWN DRY HOLE TREE. 2-May-2011 NU AND TEST BOPE. INSTALL DUTCH RISER AND PULL TWC. 3-May-2011 RIG UP TO PULL AND LAY DOWN 4-1/2" COMPLETION TUBING. UNLAND TUBING HANGER. CIRCULATE 30-BBL. BARACLEAN PILL SURFACE TO SURFACE. POH LAYING DOWN 4-1/2" COMPLETION TUBING, CONTROL, BALL VALVE, GLM AND CUT JOINT. CONDUCT AAR'S AND RECORD LL'S. P.T. lubricator to 300 psi-low/3500 psi-high; Pulled 6"CIW TWC#408 @ 84"w/6-5'ext. & 1-5'centralizer, RKP 36.96'+4.48'; Post BOPE test Doyon 25 4-May-2011 PULLED AND LAYED DOWN 4-1/2"COMPLETION TUBING. RIGGED DOWN 4-1/2"TUBING HANDLING EQUIPMENT.CLEARED AND CLEANED RIG FLOOR.AAR'D AND RECORDED LL'S FOR ALL OPERATIONS. RIGGED UP TO RIH WITH BHA#1. KICK WHILE TRIPPING (D1) DRILLS ON BOTH TOURS. 5-May-2011 MADE UP AND RIH WITH CLEANOUT BHA(BHA#1)ON 4" DRILLPIPE DOUBLES FROM PIPESHED. CONDUCTED(D1) KICK WHILE TRIPPING DRILLS WITH BOTH CREWS. REVIEWED(D6) STRIPPING DRILL SOP WITH BOTH CREWS.AAR'S AND LL'S AND SOP CHANGES FOR ALL OPERATIONS. 8-May-2011 PERFORM(D2) KICK WHILE DRILLING DRILL AND(D5)WELL KILL DRILL.AAR/LL FOR BOTH DRILLS. RIH AND TAG TOP OF 4-1/2"TUBING STUB AT 4,291'. PUMPED 30-BBL HI-VIS PILL AND 30- BBL. EP MUD LUBE PILL. SIMULATED DRILLING AND BACK REAMING. 13-May-2011 CHANGE UPPER PIPE RAMS FROM 2-7/8"X 5-1/2" VBR'S TO 4-1/2"X 7"VBR'S AND PRESSURE TEST SAME. RIG UP AND RIG DOWN FRANKS FILL-UP TOOL. RIG UP AND RIH WITH 7"26#, LTC 8RD. L-80 CASING. PJSM/AAR'S/LL'S FOR ALL OPERATIONS 15-May-2011 CHANGED PIPE RAMS FROM 4-1/2"X 7"VBR'S TO 2-7/8"X 5-1/2"VBR'S AND PRESSURE TESTED SAME. PICKED UP AND RIH WITH DUMB IRON DRILLING BHA#3 TO 3,535'. 19-May-2011 FINISH PU DRILL PIPE. RU E-LINE UNIT TO SET EZSV. SET EZSV TOP AT 3284 FT WLM. 20-May-2011 TEST 9 5/8 IN CASING AND EZSV TO 3500 PSI. 23-May-2011 CONTINUE TRAINING ON RUNNING AND PULLING DRILL PIPE. RIG UP THEN RUN AND PULL 4 1/2 IN TC-II TUBING WITH BOTH CREWS. 24-May-2011 FINISH DOUBLES IN PIPE SHED.TRAIN ON LD AND PU 6 3/4 IN COLLARS, MAKING UP BHA, RIH, POOH WITH 4 IN DRILL PIPE.TEST BOPE. 27-May-2011 M11 WHIPSTOCK AND WINDOW MILLINQ ASSEMBLY. RIH AND SET WHIPSTOCK. HANG OFF ON STORM PACKER AND BEGIN 9-5/8" PACKOFF CHANGE OUT Page 1 of 4 K-10C Well History (PB1 & Sidetrack) e4A Date Summary 30-May-2011 RIH WITH MILLING ASSEMBLY. DISPLACE TO 9.4 PPG LSND. MILL WINDOW AT 3265 FT MD. CIRCULATE CLEAN. POOH. 31-May-2011 POOH WITH WINDOW MILLING BHA AND LAY DOWN SAME. PICK UP INTERMEDIATE DRILLING BHA AND RIH TO 3206'. OBTAIN DRILLING PARAMETERS 1-Jun-2011 TRIP IN HOLE. DRILLED F/3305'TO 3375'. POOH INTO CASING, SET RTTS AND TEST BOPE FOR WEEKLY REQUIREMENTS. RELEASE RTTS, R/U WIRELINE 2-Jun-2011 LID HES 9-5/8 RTTS PACKER UPON COMPLETING WEEKLY BOPE TEST. R/U WIRELINE AND rP GYRO SURVEY NEW HOLE PREVIOUSLY DRILLED. DIRECTIONAL DRILL 8-1/2" INTERMEDIATE r HOLE FROM 3,775'TO 4,913'- MD 3-Jun-2011 DIRECTIONAL DRILL 8-1/2" INTERMEDIATE HOLE FROM 4,913'TO 6,814'- MD,TROUBLESHOOT MUD PUMP 2, DRIVE FAULT 6-Jun-2011 POOH FROM 8,613'-MD TO WINDOW 3,265'-MD. MONITOR WELL. CIRCULATE B/U AT THE WINDOW. SET HES RTTS AND STORM VALVE.TEST BOPE PER WEEKLY AOGCC REQUIRMENT. RELEASE RTTS MONITOR WELL, LAY DOWN RTTS.TRIP IN HOLE TOWARDS TD 9,558'-MD 9-Jun-2011 FINISH WIPER TRIP BACK TO TD 10,276'-MD.C&C HOLE, PUMP SWEEPS S/S. POOH, PUMPING 3 BPM TO THRZ. REPAIR MALFUNCTIONING IRON DERRICK MAN, REPLACE ENCODER CABLE ON SAME. CONTINUE POOH ON ELEVATORS TO ABOVE WINDOW 3,265'-MD. CIRCULATE 2X B/U. POOH TO BHA 10-Jun-2011 L/D BHA.JET BOPE. INSTALL TEST PLUG,TEST SAME.C/O UPPER RAMS TO 7" &TEST SAME. R/U 7" INTER. CSG RUNNING EQUIP.RUN 7",26# LINER PER PROGRAM. 11-Jun-2011 RIH W/7"-26 PPF LINER PER PROGRAM. D1 DRILL. C&C MUD AT 2,341'. RIH, FILL EACH JT BREAK CIRC.&WASH DOWN AT 3,242',4,432'6,564' C&C MUD. RUN REMAINDER OF 7" LINER. R/D CSG EQUIP. PREPARE TO P/U LINER PACKER HANGER. 12-Jun-2011 FINISH RIH TO TD 10276'-MD WITH 7"26# LINER PER PROGRAM.CIRC. HOLE CLEAN. CEMENT LINER.,SET LINER HANGER,CIRCUALTE B/U AFTER HANGER/PACKER IS SET. POOH WITH DP. 13-Jun-2011 POOH W/DP& LINER RUNNING TOOL. PULL WEAR RING& INSTALL TEST PLUG. C/O UPPER RAMS TO 2-7/8 X 5-1/2 VBR'S.TEST BOPE TO 250/3500-PSI FOR 5/5 MIN CHARTED.TEST 9-5/8"X 7" CSG.TROUBLESHOOT TD. M/U 6-1/8" PROD. BHA, RIH PICKING UP DOUBLES F/PIPE SHED. 14-Jun-2011 RIH WITH 6 1/8 IN DRILLING BHA.TAG CEMENT AT 10,189 FT MD. DISPLACE WELLBORE TO 8.6 PPG QUIK-DRILN DRILLING FLUID. CUT AND SLIP DRILLING LINE 15-Jun-2011 SLIP AND CUT DRILLING LINE. DRILL UP FLOAT EQUIPMENT AND CEMENT. PERFORM FIT TO 9.8 PPG EMW. DRILL AHEAD IN 6 1/8 IN PRODUCTION PILOT HOLE. 16-Jun-2011 DRILL 6 1/8 IN PILOT HOLE TO 11,017 FT MD, 8,599 FT TVD. POOH FOR BIT CHANGE DUE TO POOR ROP. 18-Jun-2011 DRILL 6 1/8 IN PRODUCTION PILOT HOLE TO 11,617 FT MD Page 2 of 4 K-10C Well History (PB1 & Sidetrack) Date Summary 19-Jun-2011 DRILLED TO TD OF PILOT HOLE AT 11,677 FT MD, 8,815 FT TVD.CIRCULATE CLEAN. POOH TO SHOE. OPEN PUMP OUT SUB.CIRCULATE HOLE CLEAN. SPOT LCM PILL. POOH. 22-Jun-2011 DRILL OPEN HOLE SIDETRACK. h,b 23-Jun-2011 ATTEMPT TO SIDETRACK 6 1/8 IN PRODUCTION HOLE. UNABLE TO KICK OFF. POOH TO 7 IN LPt�� SHOE. PUMP 60 BBL EZ SQUEEZE LCM PILL. PERFORM HESITATION SQUEEZE. 24-Jun-2011 PERFORM LCM HESITATION SQUEEZE. RUN TO 10,810 FT MD, NEW DEPTH FOR OPEN HOLE SIDETRACK. BEGIN TIME DRILLING AT 1 FPH. 25-Jun-2011 FINISHED KICKING OFF OPEN HOLE SIDETRACK 26-Jun-2011 DRILL TO 11,775 MD. PERFORM WIPER TRIP ABOVE KAVIK TO 11,300 FT MD.CONTINUED TO DRILL AHEAD. 27-Jun-2011 DRILL TO 11,486 FT MD. POOH TO 7 IN SHOE AT 10,284 FT MD. PUMP EZ SQUEEZE LCM, PERFORM HESITATION SQUEEZE. SET STORM PACKER. RIG UP TO TEST BOPE. 30-Jun-2011 DIRECTIONALLY DRILL 6-1/8" PRODUCTION INTERVAL FROM 13,625'TO 14,524'- MD 1-Jul-2011 DIRECTIONALLY DRILLED 6-1/8" PRODUCTION INTERVAL FROM 14,524'-MD TO SECTION TD 14,943'-MD. CIRCULATE&CONDITION HOLE. POOH TO 7"CSG SHOE PUMPING 2 BPM. SERVICE TD.C/O HT-38 TD SAVER SUB. RIH TOWARDS TD 14,943'-MD 2-Jul-2011 CONTINUE WITH WIPER TRIP, RIH TO TD 14,943'- MD.CIRCULATE&CONDITION HOLE CLEAN AT TD. PUMP AT 2 BPM POOH FROM TD 14,943'-MD TO 7" SHOE. OPEN CIRC. SUB&CIRCULATE CSG CLEAN 3-Jul-2011 CONTINUED TO POOH. OPEN CIRC SUB (CCV)AT 7" SHOE. CIRCULATE CSG CLEAN. POOH, L/D DRILLING BHA. R/U 4-1/2" 12.6 PPF LINER RUNNING EQUIP. RIH WITH 4-1/2" LINER PER PROGRAM. 4-Jul-2011 RIH WITH 4-1/2" 12.6 PPF PRODUCTION LINER ON 4" DP. CEMENT PER PROGRAM. DISPLACE WELL TO 8.5 PPG SEAWATER. POOH WITH DP&LINER RUNNING TOOL. 5-Jul-2011 DISPLACE WELL TO 8.5 PPG SEAWATER. POOH L/D LINER RUNNING TOOL.TEST BOPE PER WEEKLY AOGCC REQUIRMENT.TEST 4-1/2" LINER 250-PSI LOW, 3,500-PSI HIGH. R/U TO RUN 2- 7/8" PERFORATING ASSEMBLY 6-Jul-2011 P/U SLB 2-7/8-IN. HSD 6 SPF PERFORATING GUNS, 2-7/8-IN. PAC DP. RIH WITH 4-IN. DP. 7-Jul-2011 RIH WITH SLB 2-7/8-IN. HSD 6 SPF PERFORATING GUNS, ON 4-IN. DP.TAG TOP OF 4.5-IN. LINER WITH NO-GO AT 10,098'-MD. SPACE OUT AND FIRE PERF GUNS ON DEPTH PER PROGRAM. POOH WITH 4-IN. DP. L/D 4-IN DP IN DOUBLES TO PIPE-SHED. 8-Jul-2011 L/D SHOT SLB TCP PERF GUNS FROM 2,059'TO SURFACE. CLEAN AND CLEAR FLOOR. RIH WITH 4-IN DP FROM 4,739'TO 7,014'-MD. L/D DP TO PIPE-SHED. R/U TO RUN 4-1/2-IN TBG PER PROGRAM. Page 3 of 4 K-1 0C Well History (PB1 & Sidetrack) Date Summary 9-Jul-2011 PERFORM DUMMY RUN WITH 4-1/2-IN, PRODUCTION TBG HANGER. P/U 4-1/2-IN WLEG,X-NIPPLE AND HES TNT PACKER. RIH WITH COMPLETION TBG FROM SURFACE TO 10,112'-MD. INSTALL PUP JNTS FOR NECESSARY SPACE OUT. LAND TBG HANGER AND RILDS. 10-Jul-2011 R/U CIRCULATING EQUIPMENT. REVERSE CIRCULATE&DISPLACE TO 8.5-PPG CORROSION INHIBITED BRINE. SET PACKER,TEST 4-1/2-IN TBG&ANNULUS TO 250-PSI LOW,3500-PSI HIGH. SHEAR OPEN DCR SHEAR VALVE. INSTALL TWC TEST SAME. N/D BOPE, N/U TREE. 11-Jul-2011 PRESSURE TEST TREE,,R/U DSM LUBRICATOR AND TEST SAME. PULL TWC. PUMP FREEZE PROTECT&ALLOW TO U-TUBE. INSTALL BPV AND TEST. INSTALL ALL NECESSARY WELLHEAD FITTINGS. BEGIN RIG MAINTENANCE MODIFICATIONS PRIOR TO MOVE TO A-25B Pull TWC and Set BPV 19-Jul-2011 Installed new tree. Remove swab valve from Dry hole tree, Install on new tree assembly, Install upper tree&pressure test Verified barriers, pressure tested against master to 1000 psi for 5 min(PASS). Removed swab valve installed on new tree assembly torqued to 726 ft lbs. Installed New 4 1/16 CIW upper tree and torqued to 726 ft lbs. Reinstalled tree cap and pressure tested 500 psi low 5 min (PASS)then 5000 psi high 5 min (PASS). BPV still in hole***Job Complete*** Page 4 of 4 North America - ALASKA - BP Prudhoe Bay PB K Pad K-10 500292176200 K-10CPB1 p/Of 4 '- )14 Design: K-10CPB1 Survey Report - Geographic 22 June, 2011 Survey Report-Geographic Company: North America-ALASKA-BP Local Co-ordinate Reference: Well K-10 Project: Prudhoe Bay TVD Reference: K-10C @ 66.39ft(Doyon 25) Site: PB K Pad MD Reference: K-10C @ 66.39ft(Doyon 25) Well: K-10 North Reference: True Wellbore: K-10CPB1 Survey Calculation Method: Minimum Curvature Design: K-10CPB1 Database: EDM.16-ANC Prod-WH24P Project Prudhoe Bay,GPB,PRUDHOE BAY Map System: US State Plane 1927(Exact solution) System Datum: Mean Sea Level Geo Datum: NAD 1927(NADCON CONUS) Using Well Reference Point Map Zone: Alaska Zone 04 Using geodetic scale factor Site PB K Pad,TR-11-14 Site Position: Northing: 5,973,161.33ft Latitude: 70° 19'57.435 N From: Map Easting: 670,342.10ft Longitude: 148°37'5.245 W ,Position Uncertainty: 0.00 ft Slot Radius: 0.000 in Grid Convergence: 1.30 ° Well K-10 API No 500292176200 Well Position +NI-S 0.00 ft Northing: 5,975,196.00ft Latitude: 70°20'17.355 N +E/-W 0.00 ft Easting: 670,732.00 ft Longitude: 148°36'52.509 W Position Uncertainty 0.00 ft Wellhead Elevation: 40.01 ft Ground Level: 26.38 ft Wellbore K-10CPB1 API No 500292176273 Magnetics Model Name Sample Date Declination Dip Angle Field Strength j (°) (°) (nT) BGGM2010 6/1/2011 21.60 81.02 57,660 Design K-10CPB1 Audit Notes: Version: Phase: ACTUAL Tie On Depth: 3,212.09 Vertical Section: Depth From(TVD) +N/-S +E/-W Direction (ft) (ft) (ft) (°) 29.79 0.00 0.00 131.77 Survey Program Date: 6/22/2011 From To (ft) (ft) Survey(Wellbore) Tool Name Description 112.09 3,212.09 1 :Sperry-Sun BOSS gyro multi(K-10) BOSS-GYRO Sperry-Sun BOSS gyro multishot 3,230.00 3,676.00 GYD+GC+SS(K-10CPB1) GYD-GC-SS Gyrodata gyro single shots 3,708.52 10,224.53 MWD Run 1300(K-10CPB1) MWD+IFR+MS MWD+IFR+Multi Station 10,305.79 10,969.60 MWD Run 1400(K-10CPB1) MWD+IFR+MS MWD+IFR+Multi Station 11,003.00 11,626.85 MWD Run 1500(K-10CPB1) MWD+IFR+MS MWD+IFR+Multi Station 6/22/2011 4:03:21PM Page 2 COMPASS 2003.16 Build 73 Survey Report-Geographic Company: North America-ALASKA-BP Local Co-ordinate Reference: Well K-10 Project: Prudhoe Bay TVD Reference: K-10C @ 66.39ft(Doyon 25) Site: PB K Pad MD Reference: K-10C @ 66.39ft(Doyon 25) Well: K-10 North Reference: True Wellbore: K-10CPB1 Survey Calculation Method: Minimum Curvature Design: K-10CPB1 Database: EDM.16-ANC Prod-WH24P Survey Measured Vertical Map Map Depth Inclination Azimuth Depth +N/-S +E/-W Northing Easting (ft) (°) (0) (ft) (ft) (ft) (ft) (ft) Latitude Longitude 29.79 0.00 0.00 29.79 0.00 0.00 5,975,196.00 670,732.00 70°20'17.355 N 148°36'52.509 W 112.09 0.43 357.40 112.09 0.31 -0.01 5,975,196.31 670,731.98 70°20'17.358 N 148°36'52.510 W 212.09 0.33 0.20 212.09 0.97 -0.03 5,975,196.97 670,731.95 70°20'17.365 N 148°36'52.510 W 312.09 0.17 359.90 312.09 1.41 -0.03 5,975,197.41 670,731.94 70°20' 17.369 N 148°36'52.510 W 412.09 0.27 359.00 412.09 1.79 -0.03 5,975,197.79 670,731.92 70°20' 17.373 N 148°36'52.510 W 512.09 0.32 358.61 512.08 2.31 -0.04 5,975,198.30 670,731.90 70°20'17.378 N 148°36'52.511 W 612.09 0.12 355.20 612.08 2.69 -0.06 5,975,198.69 670,731.88 70°20'17.381 N 148°36'52.511 W 712.09 0.17 347.40 712.08 2.94 -0.10 5,975,198.94 670,731.83 70°20'17.384 N 148°36'52.512 W 812.09 0.08 319.81 812.08 3.14 -0.18 5,975,199.13 670,731.75 70°20'17.386 N 148°36'52.515 W 912.09 0.03 322.50 912.08 3.21 -0.24 5,975,199.20 670,731.69 70°20'17.387 N 148°36'52.516 W 1,012.09 0.05 318.11 1,012.08 3.26 -0.28 5,975,199.26 670,731.64 70°20'17.387 N 148°36'52.518 W 1,112.09 0.32 307.61 1,112.08 3.47 -0.54 5,975,199.45 670,731.39 70°20'17.389 N 148°36'52.525 W 1,212.09 0.60 311.40 1,212.08 3.98 -1.15 5,975,199.96 670,730.76 70°20'17.394 N 148°36'52.543 W 1,312.09 0.67 304.90 1,312.07 4.66 -2.02 5,975,200.62 670,729.87 70°20'17.401 N 148°36'52.569 W 1,412.09 0.70 310.40 1,412.07 5.40 -2.97 5,975,201.33 670,728.91 70°20'17.408 N 148°36'52.596 W 1,512.09 0.70 299.81 1,512.06 6.09 -3.96 5,975,202.00 670,727.90 70°20'17.415 N 148°36'52.625 W 1,612.09 0.63 294.50 1,612.05 6.63 -4.99 5,975,202.51 670,726.86 70°20'17.420 N 148°36'52.655 W 1,712.09 0.57 291.40 1,712.05 7.04 -5.95 5,975,202.90 670,725.89 70°20'17.424 N 148°36'52.683 W 1,812.09 0.55 290.31 1,812.04 7.38 -6.87 5,975,203.23 670,724.97 70°20'17.428 N 148°36'52.710 W 1,912.09 0.53 288.70 1,912.04 7.70 -7.76 5,975,203.52 670,724.07 70°20'17.431 N 148°36'52.736 W 2,012.09 0.55 290.00 2,012.03 8.01 -8.65 5,975,203.81 670,723.17 70°20'17.434 N 148°36'52.762 W 2,112.09 0.18 152.31 2,112.03 8.04 -9.02 5,975,203.83 670,722.80 70°20'17.434 N 148°36'52.773 W 2,212.09 0.50 115.00 2,212.03 7.71 -8.55 5,975,203.52 670,723.27 70°20'17.431 N 148°36'52.759 W 2,312.09 0.57 88.39 2,312.02 7.54 -7.66 5,975,203.37 670,724.17 70°20'17.429 N 148°36'52.733 W 2,412.09 0.65 122.61 2,412.02 7.25 -6.69 5,975,203.10 670,725.15 70°20'17.426 N 148°36'52.705 W 2,512.09 0.63 137.90 2,512.01 6.54 -5.84 5,975,202.40 670,726.01 70°20'17.419 N 148°36'52.680 W 2,612.09 0.85 139.11 2,612.00 5.57 -4.99 5,975,201.45 670,726.89 70°20'17.410 N 148°36'52.655 W 2,712.09 0.67 130.20 2,712.00 4.63 -4.05 5,975,200.54 670,727.84 70°20'17.401 N 148°36'52.628 W 2,812.09 0.53 146.50 2,811.99 3.87 -3.35 5,975,199.79 670,728.56 70°20'17.393 N 148°36'52.607 W 2,912.09 2.82 289.11 2,911.95 4.29 -5.42 5,975,200.16 670,726.48 70°20'17.397 N 148°36'52.668 W 3,012.09 6.33 304.11 3,011.62 8.19 -12.31 5,975,203.90 670,719.50 70°20'17.436 N 148°36'52.869 W 3,112.09 9.17 296.61 3,110.70 14.85 -24.00 5,975,210.30 670,707.66 70°20'17.501 N 148°36'53.211 W 3,212.09 10.32 296.61 3,209.26 22.43 -39.14 5,975,217.53 670,692.36 70°20'17.576 N 148°36'53.653 W 3,230.00 10.40 294.05 3,226.88 23.81 -42.05 5,975,218.84 670,689.42 70°20'17.589 N 148°36'53.738 W 3,265.00 11.87 291.30 3,261.22 26.40 -48.29 5,975,221.29 670,683.13 70°20'17.615 N 148°36'53.920 W 3,282.00 12.41 289.73 3,277.84 27.65 -51.64 5,975,222.47 670,679.75 70°20'17.627 N 148°36'54.018 W 3,300.00 12.68 289.61 3,295.41 28.97 -55.32 5,975,223.70 670,676.04 70°20'17.640 N 148°36'54.125 W 3,330.00 13.72 282.68 3,324.62 30.86 -61.89 5,975,225.44 670,669.43 70°20'17.658 N 148°36'54.317 W 3,360.00 14.97 271.42 3,353.69 31.73 -69.24 5,975,226.15 670,662.06 70°20'17.667 N 148°36'54.532 W 3,390.00 15.93 264.85 3,382.60 31.46 -77.21 5,975,225.69 670,654.10 70°20'17.664 N 148°36'54.765 W 3,420.00 17.69 260.21 3,411.32 30.31 -85.80 5,975,224.35 670,645.53 70°20'17.653 N 148°36'55.016 W 3,450.00 19.91 255.10 3,439.72 28.23 -95.23 5,975,222.05 670,636.15 70°20'17.633 N 148°36'55.291 W 3,480.00 21.28 251.65 3,467.80 25.20 -105.34 5,975,218.79 670,626.12 70°20'17.603 N 148°36'55.586 W 3,510.00 21.42 250.59 3,495.75 21.66 -115.67 5,975,215.02 670,615.87 70°20'17.568 N 148°36'55.888 W 3,540.00 21.38 250.59 3,523.68 18.03 -126.00 5,975,211.15 670,605.63 70°20'17.532 N 148°36'56.190 W 3,570.00 19.36 251.24 3,551.80 14.61 -135.86 5,975,207.51 670,595.85 70°20'17.499 N 148°36'56.478 W 3,600.00 17.62 252.39 3,580.25 11.64 -144.90 5,975,204.33 670,586.88 70°20'17.469 N 148°36'56.742 W 3,630.00 17.08 252.83 3,608.88 8.96 -153.44 5,975,201.47 670,578.41 70°20'17.443 N 148°36'56.991 W 3,660.00 16.76 252.97 3,637.59 6.39 -161.78 5,975,198.71 670,570.12 70°20'17.418 N 148°36'57.235 W 3,676.00 16.62 252.60 3,652.91 5.03 -166.17 5,975,197.25 670,565.77 70°20'17.405 N 148°36'57.363 W 3,708.52 15.12 250.06 3,684.19 2.20 -174.60 5,975,194.22 670,557.41 70°20'17.377 N 148°36'57.609 W 3,735.86 14.21 247.63 3,710.64 -0.30 -181.05 5,975,191.58 670,551.01 70°20'17.352 N 148°36'57.798 W 3,772.05 14.31 244.13 3,745.72 -3.94 -189.18 5,975,187.76 670,542.97 70°20'17.316 N 148°36'58.035 W 3,803.79 14.94 238.46 3,776.43 -7.79 -196.20 5,975,183.74 670,536.04 70°20'17.278 N 148°36'58.240 W 3,830.89 14.85 234.58 3,802.62 -11.63 -202.01 5,975,179.77 670,530.32 70°20'17.241 N 148°36'58.410 W 6/22/2011 4:03.21PM Page 3 COMPASS 2003.16 Build 73 Survey Report-Geographic Company: North America-ALASKA-BP Local Co-ordinate Reference: Well K-10 Project: Prudhoe Bay TVD Reference: K-10C @ 66.39ft(Doyon 25) Site: PB K Pad MD Reference: K-10C @ 66.39ft(Doyon 25) Well K-10 North Reference: True Wellbore: K-10CPB1 Survey Calculation Method: Minimum Curvature Design: K-10CPB1 Database: EDM.16-ANC Prod-WH24P Survey Measured Vertical Map Map Depth Inclination Azimuth Depth +NI-S +E/-W Northing Easting (ft) (°) (°) (ft) (ft) (ft) (ft) (ft) Latitude Longitude 3,860.93 14.84 231.18 3,831.66 -16.27 -208.14 5,975,174.99 670,524.29 70°20'17.195 N 148°36'58.589 W 3,890.56 14.70 225.27 3,860.31 -21.30 -213.77 5,975,169.84 670,518.78 70°20'17.146 N 148°36'58.753 W 3,926.26 15.00 212.06 3,894.83 -28.40 -219.44 5,975,162.61 670,513.27 70°20'17.076 N 148°36'58.919 W 3,993.23 15.11 197.15 3,959.52 -44.09 -226.62 5,975,146.76 670,506.46 70°20'16.921 N 148°36'59.128 W 4,021.31 15.19 187.47 3,986.63 -51.24 -228.18 5,975,139.58 670,505.06 70°20'16.851 N 148°36'59.174 W 4,057.08 15.47 181.99 4,021.13 -60.65 -228.95 5,975,130.15 670,504.50 70°20'16.758 N 148°36'59.196 W 4,084.54 15.99 174.89 4,047.57 -68.08 -228.74 5,975,122.73 670,504.88 70°20'16.685 N 148°36'59.190 W 4,118.52 15.99 168.44 4,080.23 -77.33 -227.39 5,975,113.52 670,506.45 70°20'16.594 N 148°36'59.151 W 4,148.05 15.90 167.66 4,108.63 -85.27 -225.71 5,975,105.62 670,508.31 70°20'16.516 N 148°36'59.102 W 4,179.89 15.97 165.01 4,139.24 -93.76 -223.64 5,975,097.18 670,510.56 70°20'16.433 N 148°36'59.041 W 4,210.25 15.89 160.85 4,168.44 -101.72 -221.20 5,975,089.28 670,513.19 70°20'16.355 N 148°36'58.970 W 4,243.61 15.49 154.43 4,200.56 -110.05 -217.78 5,975,081.02 670,516.80 70°20'16.273 N 148°36'58.870 W 4,275.54 15.47 153.66 4,231.33 -117.72 -214.05 5,975,073.45 670,520.70 70°20'16.197 N 148°36'58.761 W 4,305.95 16.29 151.56 4,260.58 -125.10 -210.22 5,975,066.15 670,524.70 70°20'16.125 N 148°36'58.649 W 4,339.34 17.10 149.51 4,292.56 -133.45 -205.50 5,975,057.92 670,529.61 70°20'16.043 N 148°36'58.511 W 4,370.33 18.81 146.74 4,322.04 -141.55 -200.44 5,975,049.93 670,534.84 70°20'15.963 N 148°36'58.364 W 4,399.58 19.42 145.26 4,349.68 -149.49 -195.09 5,975,042.11 670,540.38 70°20'15.885 N 148°36'58.207 W 4,433.03 19.29 143.94 4,381.24 -158.53 -188.67 5,975,033.23 670,547.00 70°20'15.796 N 148°36'58.020 W 4,465.32 20.39 139.93 4,411.61 -167.15 -181.90 5,975,024.77 670,553.96 70°20'15.711 N 148°36'57.822 W 4,493.78 20.91 139.13 4,438.25 -174.78 -175.39 5,975,017.28 670,560.65 70°20'15.636 N 148°36'57.632 W 4,527.43 20.96 138.00 4,469.67 -183.79 -167.43 5,975,008.45 670,568.80 70°20'15.547 N 148°36'57.400 W 4,587.81 22.42 134.64 4,525.78 -199.91 -152.01 5,974,992.69 670,584.59 70°20'15.389 N 148°36'56.949 W 4,683.99 24.92 132.36 4,613.86 -226.46 -123.98 5,974,966.79 670,613.21 70°20'15.128 N 148°36'56.131 W 4,778.87 27.05 130.44 4,699.15 -253.92 -92.79 5,974,940.05 670,645.02 70°20'14.858 N 148°36'55.220 W 4,873.28 29.11 130.56 4,782.44 -282.78 -59.00 5,974,911.97 670,679.46 70°20'14.574 N 148°36'54.233 W 4,969.04 33.52 132.88 4,864.23 -315.94 -21.91 5,974,879.67 670,717.29 70°20'14.248 N 148°36'53.149 W 5,001.72 35.28 131.63 4,891.20 -328.35 -8.24 5,974,867.57 670,731.23 70°20'14.126 N 148°36'52.750 W 5,032.63 37.21 132.56 4,916.13 -340.60 5.31 5,974,855.63 670,745.07 70°20'14.005 N 148°36'52.354 W 5,063.49 38.95 132.61 4,940.42 -353.48 19.33 5,974,843.07 670,759.37 70°20'13.879 N 148°36'51.945 W 5,099.21 40.69 132.55 4,967.85 -368.96 36.17 5,974,827.99 670,776.56 70°20'13.726 N 148°36'51.453 W 5,130.90 42.25 134.20 4,991.60 -383.37 51.42 5,974,813.92 670,792.13 70°20'13.585 N 148°36'51.008 W 5,158.33 42.96 134.20 5,011.78 -396.32 64.73 5,974,801.29 670,805.73 70°20'13.457 N 148°36'50.619 W 5,253.68 45.83 133.86 5,079.91 -442.67 112.69 5,974,756.04 670,854.73 70°20'13.001 N 148°36'49.218 W 5,289.25 48.27 133.69 5,104.14 -460.68 131.49 5,974,738.46 670,873.93 70°20'12.824 N 148°36'48.669 W 5,321.03 50.69 133.06 5,124.79 -477.27 149.05 5,974,722.28 670,891.87 70°20'12.661 N 148°36'48.156 W 5,348.54 52.08 132.24 5,141.96 -491.83 164.86 5,974,708.08 670,908.00 70°20'12.518 N 148°36'47.695 W 5,384.11 54.22 131.63 5,163.29 -510.85 186.03 5,974,689.55 670,929.60 70°20'12.331 N 148°36'47.076 W 5,415.73 55.48 132.02 5,181.49 -528.09 205.30 5,974,672.75 670,949.25 70°20'12.161 N 148°36'46.514 W 5,442.94 55.54 131.83 5,196.90 -543.08 221.98 5,974,658.15 670,966.28 70°20'12.014 N 148°36'46.026 W 5,478.98 58.51 131.79 5,216.51 -563.23 244.52 5,974,638.52 670,989.26 70°20'11.816 N 148°36'45.368 W 5,510.78 60.52 131.78 5,232.65 -581.49 264.95 5,974,620.73 671,010.10 70°20'11.636 N 148°36'44.772 W 5,538.28 60.89 131.66 5,246.10 -597.45 282.85 5,974,605.18 671,028.36 70°20'11.479 N 148°36'44.249 W 5,632.73 60.51 131.69 5,292.32 -652.22 344.37 5,974,551.84 671,091.11 70°20'10.940 N 148°36'42.452 W 5,727.75 60.06 132.41 5,339.42 -707.49 405.65 5,974,497.98 671,153.63 70°20'10.397 N 148°36'40.663 W 5,822.38 59.61 132.35 5,386.97 -762.64 466.09 5,974,444.23 671,215.30 70°20'9.854 N 148°36'38.898 W 5,916.70 59.07 132.17 5,435.07 -817.20 526.14 5,974,391.05 671,276.57 70°20'9.318 N 148°36'37.144 W 6,010.75 59.04 132.10 5,483.43 -871.31 585.95 5,974,338.31 671,337.60 70°20'8.786 N 148°36'35.397 W 6,105.50 58.44 132.91 5,532.60 -926.04 645.66 5,974,284.97 671,398.54 70°20'8.247 N 148°36'33.654 W 6,200.04 60.19 130.92 5,580.85 -980.33 706.17 5,974,232.07 671,460.26 70°20'7.713 N 148°36'31.887 W 6,295.65 60.00 130.92 5,628.52 -1,034.62 768.79 5,974,179.22 671,524.10 70°20'7.179 N 148°36'30.058 W 6,390.37 59.52 131.19 5,676.22 -1,088.36 830.50 5,974,126.90 671,587.01 70°20'6.651 N 148°36'28.256 W 6,486.69 59.18 130.82 5,725.32 -1,142.73 893.03 5,974,073.97 671,650.76 70°20'6.116 N 148°36'26.430 W 6,580.78 59.10 130.69 5,773.59 -1,195.46 954.22 5,974,022.65 671,713.12 70°20'5.597 N 148°36'24.644 W 6,673.71 58.86 130.49 5,821.48 -1,247.28 1,014.69 5,973,972.23 671,774.76 70°20'5.088 N 148°36'22.878 W 6,770.53 59.84 132.46 5,870.84 -1,302.44 1,077.09 5,973,918.50 671,838.39 70°20'4.545 N 148°36'21.056 W 6/22/2011 4:03:21 PM Page 4 COMPASS 2003.16 Build 73 Survey Report-Geographic Company: North America-ALASKA-BP Local Co-ordinate Reference: Well K-10 Project: Prudhoe Bay TVD Reference: K-10C @ 66.39ft(Doyon 25) Site: PB K Pad MD Reference: K-10C @ 66.39ft(Doyon 25) Well: K-10 North Reference: True Wellbore: K-10CPB1 Survey Calculation Method: Minimum Curvature Design: K-10CPB1 Database: EDM.16-ANC Prod-WI-124P Survey Measured Vertical Map Map Depth Inclination Azimuth Depth +N/-S +E/-W Northing Easting (ft) (0) (0) (ft) (ft) (ft) (ft) (ft) Latitude Longitude 6,865.09 59.79 132.01 5,918.38 -1,357.39 1,137.61 5,973,864.96 671,900.14 70°20'4.004 N 148°36'19.289 W 6,959.71 59.75 132.47 5,966.02 -1,412.34 1,198.13 5,973,811.40 671,961.90 70°20'3.464 N 148°36'17.522 W 7,054.25 59.72 132.25 6,013.67 -1,467.36 1,258.47 5,973,757.77 672,023.47 70°20'2.923 N 148°36'15.760 W 7,148.86 59.35 131.79 6,061.64 -1,521.95 1,319.05 5,973,704.58 672,085.27 70°20'2.386 N 148°36'13.991 W 7,243.82 59.04 132.05 6,110.27 -1,576.44 1,379.74 5,973,651.49 672,147.18 70°20'1.850 N 148°36'12.219 W 7,339.05 58.73 131.31 6,159.48 -1,630.65 1,440.63 5,973,598.68 672,209.29 70°20'1.316 N 148°36'10.442 W 7,433.24 58.52 131.20 6,208.52 -1,683.68 1,501.09 5,973,547.04 672,270.93 70°20'0.795 N 148°36'8.677 W 7,527.42 58.54 131.49 6,257.69 -1,736.75 1,561.39 5,973,495.37 672,332.42 70°20'0.273 N 148°36'6.916 W 7,622.03 58.46 131.55 6,307.12 -1,790.22 1,621.79 5,973,443.29 672,394.02 70°19'59.747 N 148°36'5.153 W 7,717.94 58.50 131.98 6,357.26 -1,844.68 1,682.77 5,973,390.24 672,456.22 70°19'59.211 N 148°36'3.372 W 7,812.85 58.38 132.63 6,406.94 -1,899.11 1,742.58 5,973,337.18 672,517.25 70°19'58.676 N 148°36'1.626 W 7,906.53 56.99 132.01 6,457.01 -1,952.41 1,801.12 5,973,285.23 672,576.98 70°19'58.151 N 148°35'59.917 W 8,002.42 56.40 131.98 6,509.67 -2,006.03 1,860.68 5,973,232.98 672,637.74 70°19'57.624 N 148°35'58.179 W 8,096.67 55.91 131.47 6,562.16 -2,058.13 1,919.10 5,973,182.23 672,697.33 70°19'57.111 N 148°35'56.473 W 8,190.83 55.50 131.73 6,615.21 -2,109.78 1,977.27 5,973,131.93 672,756.66 70°19'56.603 N 148°35'54.775 W 8,285.65 54.85 131.52 6,669.36 -2,161.48 2,035.46 5,973,081.57 672,816.00 70°19'56.094 N 148°35'53.076 W 8,380.76 54.18 131.04 6,724.57 -2,212.58 2,093.65 5,973,031.81 672,875.35 70°19'55.592 N 148°35'51.378 W 8,476.42 53.94 130.20 6,780.72 -2,263.00 2,152.44 5,972,982.75 672,935.26 70°19'55.096 N 148°35'49.661 W 8,572.09 53.01 129.86 6,837.66 -2,312.45 2,211.31 5,972,934.65 672,995.23 70°19'54.609 N 148°35'47.943 W 8,666.31 52.30 129.24 6,894.81 -2,360.14 2,269.06 5,972,888.29 673,054.06 70°19'54.140 N 148°35'46.257 W 8,760.39 51.61 129.15 6,952.79 -2,406.97 2,326.48 5,972,842.79 673,112.52 70°19'53.679 N 148°35'44.581 W 8,855.28 49.27 128.25 7,013.22 -2,452.71 2,383.56 5,972,798.36 673,170.63 70°19'53.229 N 148°35'42.915 W 8,948.11 47.22 127.70 7,075.04 -2,495.32 2,438.15 5,972,757.00 673,226.16 70°19'52.810 N 148°35'41.322 W 9,044.61 46.50 127.72 7,141.03 -2,538.39 2,493.85 5,972,715.21 673,282.83 70°19'52.386 N 148°35'39.695 W 9,076.72 45.93 127.43 7,163.24 -2,552.53 2,512.22 5,972,701.50 673,301.52 70°19'52.247 N 148°35'39.159 W 9,108.17 43.57 126.04 7,185.58 -2,565.78 2,529.96 5,972,688.66 673,319.55 70°19'52.117 N 148°35'38.641 W 9,139.83 42.26 124.58 7,208.77 -2,578.24 2,547.55 5,972,676.61 673,337.42 70° 19'51.994 N 148°35'38.128 W 9,233.96 39.43 122.51 7,279.97 -2,612.28 2,598.83 5,972,643.75 673,389.46 70° 19'51.659 N 148°35'36.631 W 9,265.59 38.26 121.90 7,304.60 -2,622.85 2,615.62 5,972,633.56 673,406.48 70° 19'51.555 N 148°35'36.141 W 9,297.64 35.53 120.43 7,330.23 -2,632.81 2,632.08 5,972,623.97 673,423.16 70°19'51.457 N 148°35'35.661 W 9,328.92 34.53 119.77 7,355.85 -2,641.82 2,647.61 5,972,615.32 673,438.89 70° 19'51.368 N 148°35'35.207 W 9,423.33 30.32 116.49 7,435.53 -2,665.74 2,692.19 5,972,592.42 673,484.00 70°19'51.133 N 148°35'33.906 W 9,519.13 27.02 111.56 7,519.58 -2,684.54 2,734.08 5,972,574.59 673,526.31 70°19'50.948 N 148°35'32.683 W 9,613.32 25.92 104.38 7,603.92 -2,697.51 2,773.94 5,972,562.52 673,566.45 70°19'50.820 N 148°35'31.519 W 9,706.06 25.84 98.28 7,687.37 -2,705.46 2,813.58 5,972,555.48 673,606.26 70°19'50.742 N 148°35'30.362 W 9,803.45 26.89 93.25 7,774.64 -2,709.77 2,856.58 5,972,552.16 673,649.34 70°19'50.699 N 148°35'29.107 W 9,898.40 25.35 92.75 7,859.89 -2,711.96 2,898.32 5,972,550.91 673,691.12 70°19'50.678 N 148°35'27.888 W 9,992.50 26.26 91.76 7,944.61 -2,713.56 2,939.25 5,972,550.24 673,732.07 70°19'50.662 N 148°35'26.693 W 10,086.69 27.11 92.26 8,028.77 -2,715.05 2,981.52 5,972,549.72 673,774.36 70°19'50.647 N 148°35'25.459 W 10,181.79 26.81 93.01 8,113.53 -2,717.03 3,024.59 5,972,548.72 673,817.46 70°19'50.627 N 148°35'24.201 W 10,224.53 26.26 92.91 8,151.77 -2,718.02 3,043.66 5,972,548.17 673,836.55 70°19'50.618 N 148°35'23.645 W 10,305.79 26.17 95.16 8,224.67 -2,720.54 3,079.46 5,972,546.46 673,872.39 70°19'50.593 N 148°35'22.600 W 10,340.41 28.89 96.92 8,255.37 -2,722.24 3,095.37 5,972,545.13 673,888.34 70°19'50.576 N 148°35'22.135 W 10,371.98 34.56 99.91 8,282.21 -2,724.70 3,111.77 5,972,543.04 673,904.79 70°19'50.552 N 148°35'21.656 W 10,402.95 37.33 98.97 8,307.28 -2,727.67 3,129.70 5,972,540.47 673,922.79 70°19'50.522 N 148°35'21.133 W 10,434.76 38.48 97.43 8,332.38 -2,730.46 3,149.05 5,972,538.13 673,942.18 70°19'50.495 N 148°35'20.568 W 10,466.14 41.63 95.05 8,356.40 -2,732.64 3,169.12 5,972,536.41 673,962.30 70°19'50.473 N 148°35'19.982 W 10,496.56 44.17 94.34 8,378.68 -2,734.33 3,189.75 5,972,535.18 673,982.97 70°19'50.457 N 148°35'19.379 W 10,529.76 45.78 94.52 8,402.17 -2,736.14 3,213.15 5,972,533.90 674,006.39 70°19'50.439 N 148°35'18.696 W 10,561.12 47.98 97.32 8,423.60 -2,738.51 3,235.91 5,972,532.05 674,029.20 70°19'50.415 N 148°35'18.032 W 10,591.21 49.04 99.01 8,443.54 -2,741.72 3,258.22 5,972,529.36 674,051.58 70°19'50.384 N 148°35'17.381 W 10,624.61 50.65 99.89 8,465.08 -2,745.91 3,283.40 5,972,525.74 674,076.84 70°19'50.342 N 148°35'16.646 W 10,655.98 54.29 100.58 8,484.18 -2,750.33 3,307.87 5,972,521.88 674,101.41 70°19'50.299 N 148°35'15.931 W 10,686.75 56.93 101.24 8,501.56 -2,755.14 3,332.80 5,972,517.64 674,126.44 70° 19'50.251 N 148°35'15.203 W 10,717.86 61.16 102.10 8,517.56 -2,760.54 3,358.92 5,972,512.83 674,152.68 70° 19'50.198 N 148°35'14.441 W 6/22/2011 4.03:21 PM Page 5 COMPASS 2003.16 Build 73 Survey Report-Geographic Company: North America-ALASKA-BP Local Co-ordinate Reference: Well K-10 Project: Prudhoe Bay ND Reference: K-10C @ 66.39ft(Doyon 25) Site: PB K Pad MD Reference: K-10C @ 66.39ft(Doyon 25) Well: K-10 North Reference: True Wellbore: K-10CPB1 Survey Calculation Method: Minimum Curvature Design: K-10CPB1 Database: EDM .16-ANC Prod-WH24P Survey Measured Vertical Map Map Depth Inclination Azimuth Depth +N/-S +E/-W Northing Easting (ft) (°) (0) (ft) (ft), (ft) (ft) (ft) Latitude Longitude 10,750.79 65.43 104.29 8,532.36 -2,767.26 3,387.55 5,972,506.76 674,181.45 70° 19'50.132 N 148°35'13.605 W 10,781.57 68.12 104.53 8,544.49 -2,774.30 3,414.95 5,972,500.35 674,209.00 70° 19'50.062 N 148°35 12.805 W 10,813.82 72.63 104.88 8,555.32 -2,782.01 3,444.32 5,972,493.31 674,238.54 70°19'49.986 N 148°35'11.948 W 10,845.50 76.89 103.03 8,563.65 -2,789.38 3,473.98 5,972,486.63 674,268.35 70° 19'49.914 N 148°35 11.082 W 10,875.48 77.24 103.02 8,570.36 -2,795.96 3,502.44 5,972,480.69 674,296.96 70° 19'49.849 N 148°35'10.251 W 10,908.28 76.64 102.36 8,577.77 -2,802.98 3,533.62 5,972,474.38 674,328.28 70° 19'49.780 N 148°35'9.341 W 10,969.60 78.87 101.92 8,590.78 -2,815.58 3,592.20 5,972,463.12 674,387.13 70° 19'49.656 N 148°35'7.631 W 11,003.00 78.25 101.27 8,597.40 -2,822.16 3,624.26 5,972,457.27 674,419.34 70° 19'49.591 N 148°35'6.694 W 11,035.70 75.53 100.67 8,604.82 -2,828.22 3,655.53 5,972,451.93 674,450.73 70° 19'49.531 N 148°35'5.782 W 11,066.38 75.07 100.45 8,612.60 -2,833.66 3,684.70 5,972,447.15 674,480.01 70° 19'49.477 N 148°35'4.930 W 11,160.07 76.47 100.87 8,635.63 -2,850.46 3,773.95 5,972,432.39 674,569.61 70° 19'49.312 N 148°35'2.325 W 11,199.39 76.04 100.48 8,644.97 -2,857.54 3,811.48 5,972,426.17 674,607.29 70° 19'49.242 N 148°35'1.229 W 11,255.49 75.97 100.63 8,658.54 -2,867.51 3,864.99 5,972,417.42 674,661.02 70° 19'49.144 N 148°34'59.667 W 11,288.08 76.24 100.75 8,666.37 -2,873.38 3,896.08 5,972,412.27 674,692.23 70° 19'49.086 N 148°34'58.759 W 11,350.05 75.97 99.94 8,681.25 -2,884.18 3,955.26 5,972,402.81 674,751.63 70° 19'48.979 N 148°34'57.032 W 11,382.61 74.56 99.39 8,689.53 -2,889.47 3,986.30 5,972,398.23 674,782.78 70° 19'48.927 N 148°34'56.125 W 11,413.86 74.38 99.04 8,697.90 -2,894.29 4,016.02 5,972,394.09 674,812.60 70° 19'48.879 N 148°34'55.258 W 11,445.12 75.14 98.70 8,706.12 -2,898.94 4,045.82 5,972,390.12 674,842.50 70° 19'48.834 N 148°34'54.388 W 11,477.45 70.81 100.06 8,715.58 -2,903.97 4,076.31 5,972,385.78 674,873.10 70° 19'48.784 N 148°34'53.498 W 11,509.01 66.50 99.54 8,727.06 -2,908.98 4,105.27 5,972,381.44 674,902.16 70° 19'48.735 N 148°34'52.652 W 11,540.38 63.38 99.25 8,740.35 -2,913.61 4,133.30 5,972,377.44 674,930.29 70° 19'48.689 N 148°34'51.834 W 11,571.52 58.85 99.80 8,755.39 -2,918.12 4,160.19 5,972,373.55 674,957.27 70° 19'48.644 N 148°34'51.049 W 11,603.24 55.61 101.30 8,772.56 -2,923.00 4,186.40 5,972,369.27 674,983.59 70° 19'48.596 N 148°34'50.284 W 11,626.85 54.49 101.69 8,786.08 -2,926.85 4,205.37 5,972,365.85 675,002.63 70° 19'48.558 N 148°34'49.730 W 11,677.00 54.49 101.69 8,815.21 -2,935.13 4,245.34 5,972,358.49 675,042.78 70° 19'48.477 N 148°34'48.563 W Targets Target Name -hit/miss target Dip Angle Dip Dir. ND +N/-S +E/-W Northing Easting -Shape (°) (°) (ft) (ft) (ft) (ft) (ft) Latitude Longitude K-10C PB1 Tgtl 0.00 0.00 8,245.39 -2,721.06 3,082.05 5,972,546.00 673,875.00 70° 19'50.587 N 148°35'22.524 W -actual wellpath misses target center by 7.04ft at 10325.38ft MD(8242.14 TVD,-2721.42 N,3088.29 E) -Circle(radius 125.00) K-10C Fault 1 0.00 0.00 8,733.39 -2,663.33 3,841.62 5,972,621.00 674,633.00 70°19'51.152 N 148°35'0.346 W -actual wellpath misses target center by 214.92ft at 11215.00ft MD(8648.74 TVD,-2860.30 N,3826.38 E) -Point Casing Points Measured Vertical Casing Hole Depth Depth Diameter Diameter (ft) (ft) Name (in) (in) 2,706.09 2,706.00 13 3/8" 13.375 17.500 10,291.40 8,211.76 DRILLING LINER 1 7.000 8.500 Checked By: Approved By: Date: 6/22/2011 4:03:21PM Page 6 COMPASS 2003.16 Build 73 North America - ALASKA - BP Prudhoe Bay PB K Pad K-10 500292176200 K-10C Design: K-10C Survey Report - Geographic 05 July, 2011 Survey Report-Geographic Company: North America-ALASKA-BP Local Co-ordinate Reference: Well K-10 Project: Prudhoe Bay TVD Reference: K-10C @ 66.39ft(Doyon 25) Site: PB K Pad MD Reference: K-10C @ 66.39ft(Doyon 25) Well: K-10 North Reference: True Wellbore: K-10C Survey Calculation Method: Minimum Curvature Design: K-10C Database: EDM.16-ANC Prod-WH24P Project Prudhoe Bay,GPB,PRUDHOE BAY Map System: US State Plane 1927(Exact solution) System Datum: Mean Sea Level Geo Datum: NAD 1927(NADCON CONUS) Using Well Reference Point Map Zone: Alaska Zone 04 Using geodetic scale factor Site PB K Pad,TR-11-14 Site Position: Northing: 5,973,161.33ft Latitude: 70° 19'57.435 N From: Map Easting: 670,342.10ft Longitude: 148°37'5.245 W Position Uncertainty: 0.00 ft Slot Radius: 0.000in Grid Convergence: 1.30 ° 'Well K-10 API No 500292176200 Well Position +N/-S 0.00 ft Northing: 5,975,196.00ft Latitude: 70°20'17.355 N +E/-W 0.00 ft Easting: 670,732.00 ft Longitude: 148°36'52.509 W Position Uncertainty 0.00 ft Wellhead Elevation: 40.01 ft Ground Level: 26.38ft Wellbore K-10C API No 500292176204 Magnetics Model Name Sample Date Declination Dip Angle Field Strength (0) (0) (nT) BGGM2010 6/1/2011 21.60 81.02 57,660 Design K-10C Audit Notes: Version: Phase: ACTUAL Tie On Depth: 10,784.98 Vertical Section: Depth From(TVD) +N/-S +E/-W Direction (ft) (ft) (ft) (0) 29.79 0.00 0.00 117.55 Survey Program Date: 7/5/2011 From To (ft) (ft) Survey(Wellbore) Tool Name Description 112.09 3,212.09 1 :Sperry-Sun BOSS gyro multi(K-10) BOSS-GYRO Sperry-Sun BOSS gyro multishot 3,230.00 3,676.00 GYD+GC+SS(K-10CPB1) GYD-GC-SS Gyrodata gyro single shots 3,708.52 10,224.53 MWD Run 1300(K-10CPB1) MWD+IFR+MS MWD+IFR+Multi Station 10,305.79 10,781.57 MWD Run 1400(K-10CPB1) MWD+IFR+MS MWD+IFR+Multi Station 10,825.00 14,897.91 MWD Run 1600(K-10C) MWD+IFR+MS MWD+IFR+Multi Station 7/5/2011 2:23:38PM Page 2 COMPASS 2003.16 Build 73 Survey Report-Geographic Company: North America-ALASKA-BP Local Co-ordinate Reference: Well K-10 Project: Prudhoe Bay TVD Reference: K-10C @ 66.39ft(Doyon 25) Site: PB K Pad MD Reference: K-10C @ 66.39ft(Doyon 25) Well: K-10 North Reference: True Wellbore: K-10C Survey Calculation Method: Minimum Curvature Design: K-10C Database: EDM.16-ANC Prod-WH24P Survey Measured Vertical Map Map Depth Inclination Azimuth Depth +N/-5 +E/-W Northing Easting (ft) (°) (°) (ft) (ft) (ft) (ft) (ft) Latitude Longitude 29.79 0.00 0.00 29.79 0.00 0.00 5,975,196.00 670,732.00 70°20'17.355 N 148°36'52.509 W 112.09 0.43 357.40 112.09 0.31 -0.01 5,975,196.31 670,731.98 70°20'17.358 N 148°36'52.510 W 212.09 0.33 0.20 212.09 0.97 -0.03 5,975,196.97 670,731.95 70°20'17.365 N 148°36'52.510 W 312.09 0.17 359.90 312.09 1.41 -0.03 5,975,197.41 670,731.94 70°20'17.369 N 148°36'52.510 W 412.09 0.27 359.00 412.09 1.79 -0.03 5,975,197.79 670,731.92 70°20'17.373 N 148°36'52.510 W 512.09 0.32 358.61 512.08 2.31 -0.04 5,975,198.30 670,731.90 70°20'17.378 N 148°36'52.511 W 612.09 0.12 355.20 612.08 2.69 -0.06 5,975,198.69 670,731.88 70°20'17.381 N 148°36'52.511 W 712.09 0.17 347.40 712.08 2.94 -0.10 5,975,198.94 670,731.83 70°20'17.384 N 148°36'52.512 W 812.09 0.08 319.81 812.08 3.14 -0.18 5,975,199.13 670,731.75 70°20'17.386 N 148°36'52.515 W 912.09 0.03 322.50 912.08 3.21 -0.24 5,975,199.20 670,731.69 70°20'17.387 N 148°36'52.516 W 1,012.09 0.05 318.11 1,012.08 3.26 -0.28 5,975,199.26 670,731.64 70°20'17.387 N 148°36'52.518 W 1,112.09 0.32 307.61 1,112.08 3.47 -0.54 5,975,199.45 670,731.39 70°20'17.389 N 148°36'52.525 W 1,212.09 0.60 311.40 1,212.08 3.98 -1.15 5,975,199.96 670,730.76 70°20'17.394 N 148°36'52.543 W 1,312.09 0.67 304.90 1,312.07 4.66 -2.02 5,975,200.62 670,729.87 70°20'17.401 N 148°36'52.569 W 1,412.09 0.70 310.40 1,412.07 5.40 -2.97 5,975,201.33 670,728.91 70°20'17.408 N 148°36'52.596 W 1,512.09 0.70 299.81 1,512.06 6.09 -3.96 5,975,202.00 670,727.90 70°20'17.415 N 148°36'52.625 W 1,612.09 0.63 294.50 1,612.05 6.63 -4.99 5,975,202.51 670,726.86 70°20'17.420 N 148°36'52.655 W 1,712.09 0.57 291.40 1,712.05 7.04 -5.95 5,975,202.90 670,725.89 70°20'17.424 N 148°36'52.683 W 1,812.09 0.55 290.31 1,812.04 7.38 -6.87 5,975,203.23 670,724.97 70°20'17.428 N 148°36'52.710 W 1,912.09 0.53 288.70 1,912.04 7.70 -7.76 5,975,203.52 670,724.07 70°20'17.431 N 148°36'52.736 W 2,012.09 0.55 290.00 2,012.03 8.01 -8.65 5,975,203.81 670,723.17 70°20'17.434 N 148°36'52.762 W 2,112.09 0.18 152.31 2,112.03 8.04 -9.02 5,975,203.83 670,722.80 70°20'17.434 N 148°36'52.773 W 2,212.09 0.50 115.00 2,212.03 7.71 -8.55 5,975,203.52 670,723.27 70°20'17.431 N 148°36'52.759 W 2,312.09 0.57 88.39 2,312.02 7.54 -7.66 5,975,203.37 670,724.17 70°20'17.429 N 148°36'52.733 W 2,412.09 0.65 122.61 2,412.02 7.25 -6.69 5,975,203.10 670,725.15 70°20'17.426 N 148°36'52.705 W 2,512.09 0.63 137.90 2,512.01 6.54 -5.84 5,975,202.40 670,726.01 70°20'17.419 N 148°36'52.680 W 2,612.09 0.85 139.11 2,612.00 5.57 -4.99 5,975,201.45 670,726.89 70°20'17.410 N 148°36'52.655 W 2,712.09 0.67 130.20 2,712.00 4.63 -4.05 5,975,200.54 670,727.84 70°20'17.401 N 148°36'52.628 W 2,812.09 0.53 146.50 2,811.99 3.87 -3.35 5,975,199.79 670,728.56 70°20'17.393 N 148°36'52.607 W 2,912.09 2.82 289.11 2,911.95 4.29 -5.42 5,975,200.16 670,726.48 70°20'17.397 N 148°36'52.668 W 3,012.09 6.33 304.11 3,011.62 8.19 -12.31 5,975,203.90 670,719.50 70°20'17.436 N 148°36'52.869 W 3,112.09 9.17 296.61 3,110.70 14.85 -24.00 5,975,210.30 670,707.66 70°20'17.501 N 148°36'53.211 W 3,212.09 10.32 296.61 3,209.26 22.43 -39.14 5,975,217.53 670,692.36 70°20'17.576 N 148°36'53.653 W 3,230.00 10.40 294.05 3,226.88 23.81 -42.05 5,975,218.84 670,689.42 70°20'17.589 N 148°36'53.738 W 3,265.00 11.87 291.30 3,261.22 26.40 -48.29 5,975,221.29 670,683.13 70°20'17.615 N 148°36'53.920 W 3,282.00 12.41 289.73 3,277.84 27.65 -51.64 5,975,222.47 670,679.75 70°20'17.627 N 148°36'54.018 W 3,300.00 12.68 289.61 3,295.41 28.97 -55.32 5,975,223.70 670,676.04 70°20'17.640 N 148°36'54.125 W 3,330.00 13.72 282.68 3,324.62 30.86 -61.89 5,975,225.44 670,669.43 70°20'17.658 N 148°36'54.317 W 3,360.00 14.97 271.42 3,353.69 31.73 -69.24 5,975,226.15 670,662.06 70°20'17.667 N 148°36'54.532 W 3,390.00 15.93 264.85 3,382.60 31.46 -77.21 5,975,225.69 670,654.10 70°20'17.664 N 148°36'54.765 W 3,420.00 17.69 260.21 3,411.32 30.31 -85.80 5,975,224.35 670,645.53 70°20'17.653 N 148°36'55.016 W 3,450.00 19.91 255.10 3,439.72 28.23 -95.23 5,975,222.05 670,636.15 70°20'17.633 N 148°36'55.291 W 3,480.00 21.28 251.65 3,467.80 25.20 -105.34 5,975,218.79 670,626.12 70°20'17.603 N 148°36'55.586 W 3,510.00 21.42 250.59 3,495.75 21.66 -115.67 5,975,215.02 670,615.87 70°20'17.568 N 148°36'55.888 W 3,540.00 21.38 250.59 3,523.68 18.03 -126.00 5,975,211.15 670,605.63 70°20'17.532 N 148°36'56.190 W 3,570.00 19.36 251.24 3,551.80 14.61 -135.86 5,975,207.51 670,595.85 70°20'17.499 N 148°36'56.478 W 3,600.00 17.62 252.39 3,580.25 11.64 -144.90 5,975,204.33 670,586.88 70°20'17.469 N 148°36'56.742 W 3,630.00 17.08 252.83 3,608.88 8.96 -153.44 5,975,201.47 670,578.41 70°20'17.443 N 148°36'56.991 W 3,660.00 16.76 252.97 3,637.59 6.39 -161.78 5,975,198.71 670,570.12 70°20'17.418 N 148°36'57.235 W 3,676.00 16.62 252.60 3,652.91 5.03 -166.17 5,975,197.25 670,565.77 70°20'17.405 N 148°36'57.363 W 3,708.52 15.12 250.06 3,684.19 2.20 -174.60 5,975,194.22 670,557.41 70°20'17.377 N 148°36'57.609 W 3,735.86 14.21 247.63 3,710.64 -0.30 -181.05 5,975,191.58 670,551.01 70°20'17.352 N 148°36'57.798 W 3,772.05 14.31 244.13 3,745.72 -3.94 -189.18 5,975,187.76 670,542.97 70°20'17.316 N 148°36'58.035 W 3,803.79 14.94 238.46 3,776.43 -7.79 -196.20 5,975,183.74 670,536.04 70°20'17.278 N 148°36'58.240 W 3,830.89 14.85 234.58 3,802.62 -11.63 -202.01 5,975,179.77 670,530.32 70°20'17.241 N 148°36'58.410 W 7/5/2011 2:23:38PM Page 3 COMPASS 2003.16 Build 73 Survey Report-Geographic Company: North America-ALASKA-BP Local Co-ordinate Reference: Well K-10 Project: Prudhoe Bay TVD Reference: K-10C @ 66.39ft(Doyon 25) Site: PB K Pad MD Reference: K-10C @ 66.39ft(Doyon 25) Well: K-10 North Reference: True Wellbore: K-10C Survey Calculation Method: Minimum Curvature Design: K-10C Database: EDM.16-ANC Prod-WH24P Survey Measured Vertical Map Map Depth Inclination Azimuth Depth +N/-S +E/-W Northing Easting (ft) (0) (0) (ft) (ft) (ft) (ft) (ft) Latitude Longitude 3,860.93 14.84 231.18 3,831.66 -16.27 -208.14 5,975,174.99 670,524.29 70°20'17.195 N 148°36'58.589 W 3,890.56 14.70 225.27 3,860.31 -21.30 -213.77 5,975,169.84 670,518.78 70°20'17.146 N 148°36'58.753 W 3,926.26 15.00 212.06 3,894.83 -28.40 -219.44 5,975,162.61 670,513.27 70°20'17.076 N 148°36'58.919 W 3,993.23 15.11 197.15 3,959.52 -44.09 -226.62 5,975,146.76 670,506.46 70°20'16.921 N 148°36'59.128 W 4,021.31 15.19 187.47 3,986.63 -51.24 -228.18 5,975,139.58 670,505.06 70°20'16.851 N 148°36'59.174 W 4,057.08 15.47 181.99 4,021.13 -60.65 -228.95 5,975,130.15 670,504.50 70°20'16.758 N 148°36'59.196 W 4,084.54 15.99 174.89 4,047.57 -68.08 -228.74 5,975,122.73 670,504.88 70°20'16.685 N 148°36'59.190 W 4,118.52 15.99 168.44 4,080.23 -77.33 -227.39 5,975,113.52 670,506.45 70°20'16.594 N 148°36'59.151 W 4,148.05 15.90 167.66 4,108.63 -85.27 -225.71 5,975,105.62 670,508.31 70°20'16.516 N 148°36'59.102 W 4,179.89 15.97 165.01 4,139.24 -93.76 -223.64 5,975,097.18 670,510.56 70°20'16.433 N 148°36'59.041 W 4,210.25 15.89 160.85 4,168.44 -101.72 -221.20 5,975,089.28 670,513.19 70°20'16.355 N 148°36'58.970 W 4,243.61 15.49 154.43 4,200.56 -110.05 -217.78 5,975,081.02 670,516.80 70°20'16.273 N 148°36'58.870 W 4,275.54 15.47 153.66 4,231.33 -117.72 -214.05 5,975,073.45 670,520.70 70°20'16.197 N 148°36'58.761 W 4,305.95 16.29 151.56 4,260.58 -125.10 -210.22 5,975,066.15 670,524.70 70°20'16.125 N 148°36'58.649 W 4,339.34 17.10 149.51 4,292.56 -133.45 -205.50 5,975,057.92 670,529.61 70°20'16.043 N 148°36'58.511 W I 4,370.33 18.81 146.74 4,322.04 -141.55 -200.44 5,975,049.93 670,534.84 70°20'15.963 N 148°36'58.364 W 4,399.58 19.42 145.26 4,349.68 -149.49 -195.09 5,975,042.11 670,540.38 70°20'15.885 N 148°36'58.207 W 4,433.03 19.29 143.94 4,381.24 -158.53 -188.67 5,975,033.23 670,547.00 70°20'15.796 N 148°36'58.020 W 4,465.32 20.39 139.93 4,411.61 -167.15 -181.90 5,975,024.77 670,553.96 70°20'15.711 N 148°36'57.822 W 4,493.78 20.91 139.13 4,438.25 -174.78 -175.39 5,975,017.28 670,560.65 70°20'15.636 N 148°36'57.632 W 4,527.43 20.96 138.00 4,469.67 -183.79 -167.43 5,975,008.45 670,568.80 70°20'15.547 N 148°36'57.400 W 4,587.81 22.42 134.64 4,525.78 -199.91 -152.01 5,974,992.69 670,584.59 70°20'15.389 N 148°36'56.949 W 4,683.99 24.92 132.36 4,613.86 -226.46 -123.98 5,974,966.79 670,613.21 70°20'15.128 N 148°36'56.131 W 4,778.87 27.05 130.44 4,699.15 -253.92 -92.79 5,974,940.05 670,645.02 70°20'14.858 N 148°36'55.220 W I 4,873.28 29.11 130.56 4,782.44 -282.78 -59.00 5,974,911.97 670,679.46 70°20'14.574 N 148°36'54.233 W 4,969.04 33.52 132.88 4,864.23 -315.94 -21.91 5,974,879.67 670,717.29 70°20'14.248 N 148°36'53.149 W 5,001.72 35.28 131.63 4,891.20 -328.35 -8.24 5,974,867.57 670,731.23 70°20'14.126 N 148°36'52.750 W 5,032.63 37.21 132.56 4,916.13 -340.60 5.31 5,974,855.63 670,745.07 70°20'14.005 N 148°36'52.354 W 5,063.49 38.95 132.61 4,940.42 -353.48 19.33 5,974,843.07 670,759.37 70°20'13.879 N 148°36'51.945 W 5,099.21 40.69 132.55 4,967.85 -368.96 36.17 5,974,827.99 670,776.56 70°20'13.726 N 148°36'51.453 W 5,130.90 42.25 134.20 4,991.60 -383.37 51.42 5,974,813.92 670,792.13 70°20'13.585 N 148°36'51.008 W 5,158.33 42.96 134.20 5,011.78 -396.32 64.73 5,974,801.29 670,805.73 70°20'13.457 N 148°36'50.619 W 5,253.68 45.83 133.86 5,079.91 -442.67 112.69 5,974,756.04 670,854.73 70°20'13.001 N 148°36'49.218 W 5,289.25 48.27 133.69 5,104.14 -460.68 131.49 5,974,738.46 670,873.93 70°20'12.824 N 148°36'48.669 W 5,321.03 50.69 133.06 5,124.79 -477.27 149.05 5,974,722.28 670,891.87 70°20'12.661 N 148°36'48.156 W 5,348.54 52.08 132.24 5,141.96 -491.83 164.86 5,974,708.08 670,908.00 70°20'12.518 N 148°36'47.695 W 5,384.11 54.22 131.63 5,163.29 -510.85 186.03 5,974,689.55 670,929.60 70°20'12.331 N 148°36'47.076 W 5,415.73 55.48 132.02 5,181.49 -528.09 205.30 5,974,672.75 670,949.25 70°20'12.161 N 148°36'46.514 W 5,442.94 55.54 131.83 5,196.90 -543.08 221.98 5,974,658.15 670,966.28 70°20'12.014 N 148°36'46.026 W 5,478.98 58.51 131.79 5,216.51 -563.23 244.52 5,974,638.52 670,989.26 70°20'11.816 N 148°36'45.368 W 5,510.78 60.52 131.78 5,232.65 -581.49 264.95 5,974,620.73 671,010.10 70°20'11.636 N 148°36'44.772 W 5,538.28 60.89 131.66 5,246.10 -597.45 282.85 5,974,605.18 671,028.36 70°20'11.479 N 148°36'44.249 W 5,632.73 60.51 131.69 5,292.32 -652.22 344.37 5,974,551.84 671,091.11 70°20'10.940 N 148°36'42.452 W 5,727.75 60.06 132.41 5,339.42 -707.49 405.65 5,974,497.98 671,153.63 70°20'10.397 N 148°36'40.663 W 5,822.38 59.61 132.35 5,386.97 -762.64 466.09 5,974,444.23 671,215.30 70°20'9.854 N 148°36'38.898 W 5,916.70 59.07 132.17 5,435.07 -817.20 526.14 5,974,391.05 671,276.57 70°20'9.318 N 148°36'37.144 W 6,010.75 59.04 132.10 5,483.43 -871.31 585.95 5,974,338.31 671,337.60 70°20'8.786 N 148°36'35.397 W 6,105.50 58.44 132.91 5,532.60 -926.04 645.66 5,974,284.97 671,398.54 70°20'8.247 N 148°36'33.654 W I 6,200.04 60.19 130.92 5,580.85 -980.33 706.17 5,974,232.07 671,460.26 70°20'7.713 N 148°36'31.887 W 6,295.65 60.00 130.92 5,628.52 -1,034.62 768.79 5,974,179.22 671,524.10 70°20'7.179 N 148°36'30.058 W 6,390.37 59.52 131.19 5,676.22 -1,088.36 830.50 5,974,126.90 671,587.01 70°20'6.651 N 148°36'28.256 W 6,486.69 59.18 130.82 5,725.32 -1,142.73 893.03 5,974,073.97 671,650.76 70°20'6.116 N 148°36'26.430 W 6,580.78 59.10 130.69 5,773.59 -1,195.46 954.22 5,974,022.65 671,713.12 70°20'5.597 N 148°36'24.644 W 6,673.71 58.86 130.49 5,821.48 -1,247.28 1,014.69 5,973,972.23 671,774.76 70°20'5.088 N 148°36'22.878 W 6,770.53 59.84 132.46 5,870.84 -1,302.44 1,077.09 5,973,918.50 671,838.39 70°20'4.545 N 148°36'21.056 W 7/5/2011 2:23:38PM Page 4 COMPASS 2003.16 Build 73 Survey Report- Geographic Company: North America-ALASKA-BP Local Co-ordinate Reference: Well K-10 Project: Prudhoe Bay TVD Reference: K-10C©66.39ft(Doyon 25) Site: PB K Pad MD Reference: K-10C©66.39ft(Doyon 25) Well: K-10 North Reference: True Welibore: K-10C Survey Calculation Method: Minimum Curvature Design: K-10C Database: EDM.16-ANC Prod-WH24P Survey Measured Vertical Map Map Depth Inclination Azimuth Depth +N/-S +E/-W Northing Easting (ft) (°) (°) (ft) (ft) (ft) (ft) (ft) Latitude Longitude 6,865.09 59.79 132.01 5,918.38 -1,357.39 1,137.61 5,973,864.96 671,900.14 70°20'4.004 N 148°36'19.289 W 6,959.71 59.75 132.47 5,966.02 -1,412.34 1,198.13 5,973,811.40 671,961.90 70°20'3.464 N 148°36'17.522 W 7,054.25 59.72 132.25 6,013.67 -1,467.36 1,258.47 5,973,757.77 672,023.47 70°20'2.923 N 148°36'15.760 W 7,148.86 59.35 131.79 6,061.64 -1,521.95 1,319.05 5,973,704.58 672,085.27 70°20'2.386 N 148°36'13.991 W 7,243.82 59.04 132.05 6,110.27 -1,576.44 1,379.74 5,973,651.49 672,147.18 70°20'1.850 N 148°36'12.219 W 7,339.05 58.73 131.31 6,159.48 -1,630.65 1,440.63 5,973,598.68 672,209.29 70°20'1.316 N 148°36'10.442 W 7,433.24 58.52 131.20 6,208.52 -1,683.68 1,501.09 5,973,547.04 672,270.93 70°20'0.795 N 148°36'8.677 W 7,527.42 58.54 131.49 6,257.69 -1,736.75 1,561.39 5,973,495.37 672,332.42 70°20'0.273 N 148°36'6.916 W 7,622.03 58.46 131.55 6,307.12 -1,790.22 1,621.79 5,973,443.29 672,394.02 70°19'59.747 N 148°36'5.153 W 7,717.94 58.50 131.98 6,357.26 -1,844.68 1,682.77 5,973,390.24 672,456.22 70°19'59.211 N 148°36'3.372 W 7,812.85 58.38 132.63 6,406.94 -1,899.11 1,742.58 5,973,337.18 672,517.25 70°19'58.676 N 148°36'1.626 W 7,906.53 56.99 132.01 6,457.01 -1,952.41 1,801.12 5,973,285.23 672,576.98 70°19'58.151 N 148°35'59.917 W 8,002.42 56.40 131.98 6,509.67 -2,006.03 1,860.68 5,973,232.98 672,637.74 70°19'57.624 N 148°35'58.179 W 8,096.67 55.91 131.47 6,562.16 -2,058.13 1,919.10 5,973,182.23 672,697.33 70°19'57.111 N 148°35'56.473 W 8,190.83 55.50 131.73 6,615.21 -2,109.78 1,977.27 5,973,131.93 672,756.66 70°19'56.603 N 148°35'54.775 W 8,285.65 54.85 131.52 6,669.36 -2,161.48 2,035.46 5,973,081.57 672,816.00 70°19'56.094 N 148°35'53.076 W 8,380.76 54.18 131.04 6,724.57 -2,212.58 2,093.65 5,973,031.81 672,875.35 70°19'55.592 N 148°35 51.378 W 8,476.42 53.94 130.20 6,780.72 -2,263.00 2,152.44 5,972,982.75 672,935.26 70°19'55.096 N 148°35'49.661 W 8,572.09 53.01 129.86 6,837.66 -2,312.45 2,211.31 5,972,934.65 672,995.23 70°19'54.609 N 148°35'47.943 W 8,666.31 52.30 129.24 6,894.81 -2,360.14 2,269.06 5,972,888.29 673,054.06 70°19'54.140 N 148°35'46.257 W 8,760.39 51.61 129.15 6,952.79 -2,406.97 2,326.48 5,972,842.79 673,112.52 70°19'53.679 N 148°35 44.581 W 8,855.28 49.27 128.25 7,013.22 -2,452.71 2,383.56 5,972,798.36 673,170.63 70°19'53.229 N 148°35'42.915 W 8,948.11 47.22 127.70 7,075.04 -2,495.32 2,438.15 5,972,757.00 673,226.16 70°19'52.810 N 148°35'41.322 W 9,044.61 46.50 127.72 7,141.03 -2,538.39 2,493.85 5,972,715.21 673,282.83 70°19'52.386 N 148°35'39.695 W 9,076.72 45.93 127.43 7,163.24 -2,552.53 2,512.22 5,972,701.50 673,301.52 70°19'52.247 N 148°35'39.159 W 9,108.17 43.57 126.04 7,185.58 -2,565.78 2,529.96 5,972,688.66 673,319.55 70°19'52.117 N 148°35'38.641 W 9,139.83 42.26 124.58 7,208.77 -2,578.24 2,547.55 5,972,676.61 673,337.42 70°19'51.994 N 148°35'38.128 W 9,233.96 39.43 122.51 7,279.97 -2,612.28 2,598.83 5,972,643.75 673,389.46 70°19'51.659 N 148°35'36.631 W 9,265.59 38.26 121.90 7,304.60 -2,622.85 2,615.62 5,972,633.56 673,406.48 70°19'51.555 N 148°35'36.141 W 9,297.64 35.53 120.43 7,330.23 -2,632.81 2,632.08 5,972,623.97 673,423.16 70°19'51.457 N 148°35'35.661 W 9,328.92 34.53 119.77 7,355.85 -2,641.82 2,647.61 5,972,615.32 673,438.89 70°19'51.368 N 148°35'35.207 W 9,423.33 30.32 116.49 7,435.53 -2,665.74 2,692.19 5,972,592.42 673,484.00 70°19'51.133 N 148°35'33.906 W 9,519.13 27.02 111.56 7,519.58 -2,684.54 2,734.08 5,972,574.59 673,526.31 70°19'50.948 N 148°35'32.683 W 9,613.32 25.92 104.38 7,603.92 -2,697.51 2,773.94 5,972,562.52 673,566.45 70°19'50.820 N 148°35'31.519 W 9,706.06 25.84 98.28 7,687.37 -2,705.46 2,813.58 5,972,555.48 673,606.26 70°19'50.742 N 148°35'30.362 W 9,803.45 26.89 93.25 7,774.64 -2,709.77 2,856.58 5,972,552.16 673,649.34 70°19'50.699 N 148°35'29.107 W 9,898.40 25.35 92.75 7,859.89 -2,711.96 2,898.32 5,972,550.91 673,691.12 70°19'50.678 N 148°35'27.888 W 9,992.50 26.26 91.76 7,944.61 -2,713.56 2,939.25 5,972,550.24 673,732.07 70°19'50.662 N 148°35'26.693 W 10,086.69 27.11 92.26 8,028.77 -2,715.05 2,981.52 5,972,549.72 673,774.36 70°19'50.647 N 148°35'25.459 W 10,181.79 26.81 93.01 8,113.53 -2,717.03 3,024.59 5,972,548.72 673,817.46 70°19'50.627 N 148°35'24.201 W 10,224.53 26.26 92.91 8,151.77 -2,718.02 3,043.66 5,972,548.17 673,836.55 70°19'50.618 N 148°35'23.645 W 10,305.79 26.17 95.16 8,224.67 -2,720.54 3,079.46 5,972,546.46 673,872.39 70°19'50.593 N 148°35'22.600 W 10,340.41 28.89 96.92 8,255.37 -2,722.24 3,095.37 5,972,545.13 673,888.34 70°19'50.576 N 148°35'22.135 W 10,371.98 34.56 99.91 8,282.21 -2,724.70 3,111.77 5,972,543.04 673,904.79 70°19'50.552 N 148°35'21.656 W 10,402.95 37.33 98.97 8,307.28 -2,727.67 3,129.70 5,972,540.47 673,922.79 70°19'50.522 N 148°35'21.133 W 10,434.76 38.48 97.43 8,332.38 -2,730.46 3,149.05 5,972,538.13 673,942.18 70°19'50.495 N 148°35'20.568 W 10,466.14 41.63 95.05 8,356.40 -2,732.64 3,169.12 5,972,536.41 673,962.30 70°19'50.473 N 148°35'19.982 W 10,496.56 44.17 94.34 8,378.68 -2,734.33 3,189.75 5,972,535.18 673,982.97 70°19'50.457 N 148°35'19.379 W 10,529.76 45.78 94.52 8,402.17 -2,736.14 3,213.15 5,972,533.90 674,006.39 70°19'50.439 N 148°35'18.696 W 10,561.12 47.98 97.32 8,423.60 -2,738.51 3,235.91 5,972,532.05 674,029.20 70°19'50.415 N 148°35'18.032 W 10,591.21 49.04 99.01 8,443.54 -2,741.72 3,258.22 5,972,529.36 674,051.58 70°19'50.384 N 148°35'17.381 W 10,624.61 50.65 99.89 8,465.08 -2,745.91 3,283.40 5,972,525.74 674,076.84 70°19'50.342 N 148°35'16.646 W 10,655.98 54.29 100.58 8,484.18 -2,750.33 3,307.87 5,972,521.88 674,101.41 70°19'50.299 N 148°35 15.931 W 10,686.75 56.93 101.24 8,501.56 -2,755.14 3,332.80 5,972,517.64 674,126.44 70°19'50.251 N 148°35 15.203 W 10,717.86 61.16 102.10 8,517.56 -2,760.54 3,358.92 5,972,512.83 674,152.68 70° 19'50.198 N 148°35'14.441 W 7/5/2011 2:23:38PM Page 5 COMPASS 2003.16 Build 73 Survey Report-Geographic Company: North America-ALASKA-BP Local Co-ordinate Reference: Well K-10 Project: Prudhoe Bay ND Reference: K-10C @ 66.39ft(Doyon 25) Site: PB K Pad MD Reference: K-10C @ 66.39ft(Doyon 25) Well: K-10 North Reference: True Wellbore: K-10C Survey Calculation Method: Minimum Curvature Design: K-10C Database: EDM.16-ANC Prod-WH24P Survey Measured Vertical Map Map Depth Inclination Azimuth Depth +N/-S +E/-W Northing Easting (ft) (°) (°) (ft) (ft); (ft) (ft) (ft) Latitude Longitude 10,750.79 65.43 104.29 8,532.36 -2,767.26 3,387.55 5,972,506.76 674,181.45 70° 19'50.132 N 148°35'13.605 W 10,781.57 68.12 104.53 8,544.49 -2,774.30 3,414.95 5,972,500.35 674,209.00 70° 19'50.062 N 148°35 12.805 W 10,825.00 70.15 103.50 8,559.96 -2,784.13 3,454.32 5,972,491.43 674,248.58 70° 19'49.966 N 148°35'11.656 W 10,876.31 65.49 100.44 8,579.33 -2,794.00 3,500.77 5,972,482.62 674,295.24 70° 19'49.868 N 148°35'10.300 W 10,912.66 65.64 97.40 8,594.37 -2,799.13 3,533.46 5,972,478.23 674,328.04 70° 19'49.818 N 148°35'9.345 W 10,971.45 65.28 96.95 8,618.79 -2,805.81 3,586.52 5,972,472.76 674,381.23 70° 19'49.752 N 148°35'7.796 W 11,065.26 65.81 98.45 8,657.62 -2,817.25 3,671.14 5,972,463.25 674,466.09 70° 19'49.639 N 148°35'5.326 W 11,102.47 68.38 98.04 8,672.11 -2,822.17 3,705.06 5,972,459.11 674,500.11 70° 19'49.590 N 148°35'4.335 W 11,134.07 70.42 97.16 8,683.22 -2,826.08 3,734.38 5,972,455.87 674,529.50 70° 19'49.552 N 148°35'3.480 W 11,161.16 71.93 97.61 8,691.96 -2,829.37 3,759.81 5,972,453.15 674,555.00 70° 19'49.519 N 148°35'2.737 W 11,195.05 73.47 96.52 8,702.04 -2,833.35 3,791.92 5,972,449.91 674,587.19 70° 19'49.480 N 148°35'1.800 W 11,236.75 74.94 96.51 8,713.39 -2,837.90 3,831.78 5,972,446.26 674,627.14 70° 19'49.435 N 148°35'0.636 W 11,255.53 75.59 95.08 8,718.17 -2,839.74 3,849.85 5,972,444.84 674,645.25 70° 19'49.417 N 148°35'0.108 W 11,291.61 79.38 97.03 8,725.99 -2,843.46 3,884.87 5,972,441.92 674,680.34 70° 19'49.380 N 148°34'59.086 W 11,323.33 80.89 98.10 8,731.42 -2,847.57 3,915.85 5,972,438.51 674,711.40 70° 19'49.339 N 148°34'58.182 W 11,350.38 82.45 98.80 8,735.34 -2,851.50 3,942.32 5,972,435.18 674,737.96 70°19'49.301 N 148°34'57.409 W 11,418.18 85.30 102.49 8,742.58 -2,863.96 4,008.55 5,972,424.24 674,804.45 70°19'49.178 N 148°34'55.475 W 11,445.18 84.81 102.98 8,744.90 -2,869.89 4,034.79 5,972,418.91 674,830.81 70°19'49.119 N 148°34'54.709 W 11,481.19 86.66 104.04 8,747.58 -2,878.28 4,069.71 5,972,411.32 674,865.91 70°19'49.037 N 148°34'53.690 W 11,509.60 86.42 104.91 8,749.30 -2,885.37 4,097.16 5,972,404.86 674,893.52 70° 19'48.967 N 148°34'52.889 W 11,541.19 85.24 104.44 8,751.59 -2,893.35 4,127.64 5,972,397.57 674,924.17 70° 19'48.888 N 148°34'51.999 W 11,575.12 87.71 104.77 8,753.68 -2,901.89 4,160.41 5,972,389.78 674,957.12 70° 19'48.804 N 148°34'51.042 W 11,604.71 90.00 104.82 8,754.27 -2,909.44 4,189.01 5,972,382.88 674,985.89 70° 19'48.730 N 148°34'50.207 W 11,634.71 90.06 105.01 8,754.25 -2,917.16 4,218.00 5,972,375.82 675,015.04 70° 19'48.653 N 148°34'49.361 W 11,669.04 90.18 105.07 8,754.18 -2,926.07 4,251.15 5,972,367.67 675,048.39 70° 19'48.566 N 148°34'48.393 W 11,728.23 88.15 102.20 8,755.05 -2,940.02 4,308.66 5,972,355.04 675,106.19 70° 19'48.428 N 148°34'46.715 W 11,821.85 92.53 99.58 8,754.49 -2,957.70 4,400.56 5,972,339.45 675,198.47 70° 19'48.254 N 148°34'44.032 W 11,918.95 93.21 100.13 8,749.63 -2,974.30 4,496.11 5,972,325.04 675,294.36 70° 19'48.090 N 148°34'41.243 W 12,015.02 94.01 101.41 8,743.58 -2,992.22 4,590.30 5,972,309.27 675,388.92 70° 19'47.913 N 148°34'38.493 W 12,108.87 93.27 101.51 8,737.62 -3,010.82 4,682.09 5,972,292.76 675,481.11 70° 19'47.730 N 148°34'35.813 W 12,203.32 93.40 100.38 8,732.13 -3,028.73 4,774.66 5,972,276.97 675,574.06 70° 19'47.553 N 148°34'33.111 W 12,298.45 93.83 100.73 8,726.13 -3,046.12 4,868.00 5,972,261.71 675,667.76 70° 19'47.381 N 148°34'30.386 W 12,391.49 93.89 100.70 8,719.86 -3,063.38 4,959.21 5,972,246.53 675,759.34 70° 19'47.211 N 148°34'27.724 W 12,488.45 90.18 100.60 8,716.42 -3,081.28 5,054.42 5,972,230.80 675,854.92 70° 19'47.034 N 148°34'24.944 W 12,583.09 88.03 100.88 8,717.90 -3,098.91 5,147.39 5,972,215.29 675,948.26 70°19'46.860 N 148°34'22.231 W 12,677.34 86.29 98.44 8,722.57 -3,114.71 5,240.17 5,972,201.61 676,041.38 70° 19'46.704 N 148°34'19.522 W 12,772.25 88.83 100.95 8,726.61 -3,130.68 5,333.63 5,972,187.78 676,135.17 70° 19'46.547 N 148°34'16.794 W 12,866.44 90.06 104.99 8,727.52 -3,151.81 5,425.39 5,972,168.74 676,227.38 70° 19'46.338 N 148°34'14.115 W 12,961.56 89.32 106.34 8,728.04 -3,177.49 5,516.97 5,972,145.15 676,319.52 70° 19'46.085 N 148°34'11.442 W 13,055.95 89.38 108.49 8,729.11 -3,205.74 5,607.03 5,972,118.96 676,410.18 70° 19'45.806 N 148°34'8.814 W 13,150.95 90.25 108.65 8,729.42 -3,235.99 5,697.08 5,972,090.77 676,500.90 70° 19'45.508 N 148°34'6.185 W 13,245.27 91.05 110.46 8,728.35 -3,267.56 5,785.95 5,972,061.24 676,590.45 70° 19'45.197 N 148°34'3.591 W ' 13,340.69 90.68 111.81 8,726.91 -3,301.96 5,874.94 5,972,028.87 676,680.20 70° 19'44.858 N 148°34'0.994 W 13,435.34 90.74 112.02 8,725.73 -3,337.29 5,962.74 5,971,995.56 676,768.78 70° 19'44.510 N 148°33'58.432 W 13,529.39 88.89 109.88 8,726.04 -3,370.91 6,050.56 5,971,963.95 676,857.34 70° 19'44.179 N 148°33'55.869 W 13,625.20 90.25 110.29 8,726.76 -3,403.81 6,140.54 5,971,933.11 676,948.04 70° 19'43.854 N 148°33'53.243 W 13,719.88 89.63 110.24 8,726.86 -3,436.60 6,229.36 5,971,902.34 677,037.57 70° 19'43.531 N 148°33'50.650 W 13,814.49 89.51 110.01 8,727.57 -3,469.16 6,318.19 5,971,871.83 677,127.12 70° 19'43.210 N 148°33'48.058 W 13,909.31 89.14 110.42 8,728.68 -3,501.92 6,407.16 5,971,841.10 677,216.80 70° 19'42.887 N 148°33'45.461 W 14,004.27 89.38 108.25 8,729.91 -3,533.35 6,496.76 5,971,811.71 677,307.08 70° 19'42.577 N 148°33'42.847 W 14,098.94 90.99 108.90 8,729.60 -3,563.51 6,586.49 5,971,783.61 677,397.47 70° 19'42.280 N 148°33'40.228 W 14,193.72 90.80 109.37 8,728.12 -3,594.57 6,676.02 5,971,754.60 677,487.68 70° 19'41.974 N 148°33'37.615 W 14,287 57 93.40 110.70 8,724.68 -3,626.70 6,764.12 5,971,724.49 677,576.49 70° 19'41.657 N 148°33'35.044 W 14,382.63 96.06 110.58 8,716.85 -3,660.09 6,852.77 5,971,693.12 677,665.87 70° 19'41.328 N 148°33'32.457 W 14,477.48 97.49 110.06 8,705.66 -3,692.80 6,941.10 5,971,662.44 677,754.91 70° 19'41.005 N 148°33'29.879 W 7/5/2011 2:23:38PM Page 6 COMPASS 2003.16 Build 73 Survey Report-Geographic Company: North America-ALASKA-BP Local Co-ordinate Reference: Well K-10 Project: Prudhoe Bay TVD Reference: K-10C @ 66.39ft(Doyon 25) Site: PB K Pad MD Reference: K-10C @ 66.39ft(Doyon 25) Well: K-10 North Reference: True Wellbore: K-10C Survey Calculation Method: Minimum Curvature Design: K-10C Database: EDM.16-ANC Prod-WH24P Survey Measured Vertical Map Map Depth Inclination Azimuth Depth +N/-S +E/-W Northing Easting (ft) (0) (0) (ft) (ft) (ft) (ft) (ft) Latitude Longitude 14,572.34 98.87 109.30 8,692.16 -3,724.42 7,029.50 5,971,632.84 677,844.01 70° 19'40.693 N 148°33'27.299 W 14,667.41 98.37 109.12 8,677.91 -3,755.35 7,118.26 5,971,603.94 677,933.44 70° 19'40.388 N 148°33'24.709 W 14,762.18 97.67 109.87 8,664.69 -3,786.66 7,206.73 5,971,574.65 678,022.59 70° 19'40.080 N 148°33'22.127 W 14,857.00 97.30 109.68 8,652.34 -3,818.47 7,295.19 5,971,544.87 678,111.75 70° 19'39.766 N 148°33'19.545 W 14,897.91 97.43 109.72 8,647.09 -3,832.15 7,333.39 5,971,532.07 678,150.25 70° 19'39.631 N 148°33'18.431 W 14,943.00 97.43 109.72 8,641.26 -3,847.23 7,375.48 5,971,517.94 678,192.67 70° 19'39.482 N 148°33'17.203 W Targets Target Name -hit/miss target Dip Angle Dip Dir. TVD +N/-S +E/-W Northing Easting -Shape (0) (0) (ft) (ft) (ft) (ft) (ft) Latitude Longitude Interp©8208.98(K-1 8,212.39 -2,719.72 3,066.72 5,972,546.99 673,859.65 70° 19'50.601 N 148°35'22.971 W -actual wellpath misses target center by 6.04ft at 10289.14ft MD(8209.73 TVD,-2719.91 N,3072.14 E) -Point K-10C Tgt5.. 0.00 0.00 8,619.39 -3,821.49 7,389.40 5,971,544.00 678,206.00 70°19'39.735 N 148°33'16.795 W -actual wellpath misses target center by 36.54ft at 14943.00ft MD(8641.26 TVD,-3847.23 N,7375.48 E) -Point K-10C Tgt2.. 0.00 0.00 8,726.39 -2,939.10 4,266.48 5,972,355.00 675,064.00 70°19'48.437 N 148°34'47.946 W -actual wellpath misses target center by 29.17ft at 11686.60ft MD(8754.22 TVD,-2930.51 N,4268.14 E) -Point K-10C GeoPoly revl 0.00 0.00 8,691.39 -2,797.97 3,999.60 5,972,490.00 674,794.00 70° 19'49.827 N 148°34'55.736 W -actual wellpath misses target center by 79.59ft at 11391.84ft MD(8740.16 TVD,-2858.61 N,3982.87 E) -Polygon Point 1 8,691.39 -2,797.97 3,999.60 5,972,490.00 674,794.00 Point 2 8,691.39 -2,889.20 4,491.68 5,972,410.00 675,288.00 Point 3 8,691.39 -3,017.54 5,471.08 5,972,304.00 676,270.00 Point 4 8,691.39 -3,630.53 7,657.84 5,971,741.00 678,470.00 Point 5 8,691.39 -4,074.21 7,461.67 5,971,293.00 678,284.00 Point 6 8,691.39 -3,352.92 5,614.49 5,971,972.00 676,421.00 Point 7 8,691.39 -3,180.44 4,893.18 5,972,128.00 675,696.00 Point 8 8,691.39 -2,973.03 3,955.60 5,972,314.00 674,754.00 Point 9 8,691.39 -2,797.97 3,999.60 5,972,490.00 674,794.00 Point 10 8,691.39 -2,797.97 3,999.60 5,972,490.00 674,794.00 K-10C Tgt4.. 0.00 0.00 8,691.39 -3,594.77 6,746.36 5,971,756.00 677,558.00 70° 19'41.971 N 148°33'35.561 W -actual wellpath misses target center by 42.03ft at 14261.17ft MD(8726.08 TVD,-3617.46 N,6739.44 E) -Point K-10C Tgt3.. 0.00 0.00 8,711.39 -3,146.66 5,386.12 5,972,173.00 676,188.00 70°19'46.389 N 148°34'15.262 W -actual wellpath misses target center by 16.65ft at 12826.85ft MD(8727.39 TVD,-3142.14 N,5387.00 E) -Point 2,706.09 2,706.00 13 3/8" 13.375 17.500 Checked By: Approved By: Date: 7/5/2011 2:23:38PM Page 7 COMPASS 2003.16 Build 73 BP AMERICA Leak-Off Test Summary Well Name: K-10C Surface Leak Off Test Test Test Depth Test Depth AMW Pressure Pressure EMW Date Type (TMD-Ft) (TVD-Ft) (ppg) (psi) (BHP) (psi) (ppg) 05/30/11 LOT 3,274.00 3,268.99 9.50 275.00 1,888.30 11.12 06/15/11 FIT 10,296.00 8,198.00 8.70 475.00 4,180.10 9.82 06/15/11 LOT 3,294.99 8,696.39 9.20 275.00 4,431.20 9.81 **** 2nd LOT didn't have a date listed in Data Analyzer, check DDR Page 1 of 1 )rth America -ALASKA- BP - -Page 26 of 58 Operation Summary Report Common Well Name: K-10 AFE No Event Type: RE-ENTER-ONSHORE(RON) Start Date:4/27/2011 End Date:7/4/2011 X3-00XCJ-C(4,684,455.00) Project: Prudhoe Bay Site: PB K Pad Rig Name/No.: DOYON 25 Spud Date/Time:4/24/2001 12:00:00AM Rig Release: Rig Contractor: DOYON DRILLING INC. UWI:500292176200 Active Datum: K-10C @66.39ft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (ft) 20:00 - 22:30 2.50 STWHIP N HMAN 3,286.00 WEXIT POOH WITH 4"DP TO BHA.MW 8.5 PPG IN/ 8.5 PPG OUT. 22:30 - 00:00 1.50 STWHIP N HMAN 3,286.00 WEXIT L/D WHIPSTOCK RETRIEVAL HOOK BHA. 5/30/2011 00:00 - 01:30 1.50 STWHIP N HMAN 3,286.00 WEXIT CONTINUE L/D WHIPSTOCK RETRIEVAL BHA. 1 01:30 - 04:00 2.50 STWHIP N HMAN 3,286.00 WEXIT MU MILLING BHA WITH WINDOW MILL AND 3 STRING MILLS. �£ 04:00 - 07:30 3.50 STWHIP N HMAN 3,286.00 WEXIT RIH WITH MILLING BHA ON 4"DP TO 3265 FT MD.TAG TOP OF WHIPSTOCK SLIDE. 07:30 - 09:30 2.00 STWHIP P WEXIT EMPTY PITS 1,2 AND 3 OF SEAWATER IN PREPARATION FOR DISPLACEMENT. 09:30 - 10:30 1.00 STWHIP P WEXIT DISPLACE WELL FROM SEAWATER TO 9.4 PPG LSND MILLING FLUID. PUMP HI-VIS SPACER AT 210 GPM WITH 150 PSI.CHASE WITH LSND AT 336 GPM WITH 420 PSI. 10:30 - 17:00 6.50 A STWHIP P P<VEXIT A MILL WINDOW FROM 3265 FT MD TO 3305 FT MD,3300 FT TVD.PUMP AT 460 GPM WITH 680 PSI.ROTATE AT 100 RPM WITH 4-9K TORQUE.UP WEIGHT 107K,DOWN WEIGHT 110K,ROTATE WEIGHT 110K.TOP OF WINDOW 3265 FT MD,BOTTOM OF WINDOW 3282 FT MD.MIDDLE OF WINDOW 3273 FT MD. 17:00 - 18:00 1.00 STWHIP P WEXIT WORK MILLS THROUGH WINDOW SEVERAL TIMES AT PUMP RATE.SHUT DOWN PUMPS AND ROTARY.SLIDE MILLS THRU WINDOW WITH NO PROBLEMS.NO INCREASE IN WEIGHT. ?IC 18:00 - 19:30 1.50 STWHIP P WEXIT PULL UP INTO WINDOW TO 3250 FT MD. • CIRCULATE SUPER SWEEP AND BALANCE HOLE TO 9.5 PPG. HOLD AAR AND COVER SOP.APPROXIMATELY 200 LBS METAL RECOVERED FROM WELL. 19:30 - 22:30 3.00 STWHIP P WEXIT HOLD PJSM.GO OVER SOP FOR LOT. PERFORM LOT TO 11.1 PPG EMW WITH 275 PSI AT 3269 FT TVD AND 9.5 PPG MUD WEIGHT. 22:30 - 23:00 0.50 STWHIP P WEXIT RIG DOWN TEST EQUIPMENT WHILE MONITORING WELL.WELL BORE SEEPING TO FORMATION. 23:00 - 00:00 1.00 STWHIP P WEXIT PJSM.MUD WEIGHT IN AND OUT 9.5 PPG. LAY DOWN DOUBLE.PULL TWO STANDS WHILE MONITORING HOLE FOR SWABBING, FILL AFTER EACH STAND,NO SWABBING DETECTED.TURN ON HOLE FILL AND PULL WET ON ELEVATORS TO 2891'MD. 5/31/2011 100:00 - 01:00 1.00 STWHIP P WEXIT PJSM.CONTINUE TO POOH TO 2323 FT MD. UP WEIGHT 100K, DOWN 106K.MUD WEIGHT IN AND OUT 9.5 PPG. 01:00 - 02:00 1.00 STWHIP P WEXIT PJSM. PUMP DRY JOB.MONITOR WELL- SEEPAGE LOSSES.BLOW DOWN TOP DRIVE. 02:00 - 02:30 0.50 STWHIP P WEXIT CONTINUE POOH TO 1754 FT MD. 02:30 - 03:30 1.00 STWHIP P WEXIT PERFORM UN-ANNOUNCED KICK WHILE TRIPPING DRILL WITH WELL CONTROL EVALUATOR.WELL SECURE AND ALL ACCOUNTED FOR IN 3 MINUTES AND 30 SECONDS.HOLD AAR.MONITOR WELL ON TRIP TANK WITH PIT WATCHER AND MOTORMAN. Printed 8/9/2011 10:16:28AM )rth America -ALASKA- BP Page 27 of 58 Operation Summary Report Common Well Name:K-10 AFE No Event Type: RE-ENTER-ONSHORE(RON) Start Date:4/27/2011 End Date:7/4/2011 X3-00XCJ-C(4,684,455.00) Project: Prudhoe Bay Site: PB K Pad Rig Name/No.: DOYON 25 Spud Date/Time:4/24/2001 12:00:00AM Rig Release: Rig Contractor: DOYON DRILLING INC. UWI: 500292176200 Active Datum: K-10C @66.39ft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (ft) 03:30 - 04:00 0.50 STWHIP P WEXIT CONTINUE TO POOH TO BHA AT 522 FT MD. MONITOR WELL. 04:00 - 05:00 1.00 STWHIP P WEXIT PJSM. CHANGE OUT SLIP INSERTS. 05:00 - 07:30 2.50 STWHIP P WEXIT LAY DOWN MILLING BHA AND SPIRAL COLLARS. 07:30 - 09:00 1.50 STWHIP P WEXIT CLEAN AND CLEAR RIG FLOOR.P/U STACK WASHER AND JET STACK. 09:00 - 12:00 3.00 STWHIP P WEXIT SERVICE BLOCKS,TOP DRIVE,DRAWWORKS AND CROWN SHEAVES.TROUBLESHOOT IRON DERRICKMAN W/WEATHERFORD REP. FUNCTION TEST SAME W/HWDP. NOTIFY AOGCC OF UPCOMING BOPE TEST AT 10:00 HRS ON 5/31/11. 12:00 - 15:30 3.50 STWHIP P WEXIT M/U INTERMEDIATE DRILLING BHA W/8.5" PDC BIT,1.5 DEG MTR,AND MWD.UPLOAD MWD TOOL. 15:30 - 18:30 3.00 STWHIP P WEXIT P/U NMDC,5"HWDP,JARS,AND 4"HWDP. HOLE GIVING PROPER DISPLACEMENT. SHALLOW PULSE TEST MWD @ 550 GPM,950 PSI-GOOD DETECTION. BLOW DOWN TOPDRIVE. 18:30 - 22:30 4.00 STWHIP P WEXIT RIH WITH DRILLING BHA TO 1561'ON 4"DP. P/U GHOST REAMER @ 1561'BEHIND THE BIT.CONTINUE RIH TO 2072'WITH NO ISSUES. 22:30 - 23:30 1.00 STWHIP P WEXIT PERFORM UN-ANNOUNCED KICK WHILE DRILLING DRILL WITH WELL CONTROL EVALUATOR.WELL SECURE AND ALL ACCOUNTED FOR IN 2 MINUTES AND 30 SECONDS.HOLD AAR.MONITOR WELL ON TRIP TANK WITH MOTORMAN. 23:30 - 00:00 0.50 STWHIP P WEXIT CONTINUE RIH WITH DRILLING BHA TO 2262' MD. P/U 85K, S/O 92K 6/1/2011 00:00 - 02:00 2.00 STWHIP P WEXIT CONTINUE RIH FROM 2262'to 3204'MD.P/U 100K,S/0 107K.MONITOR DISPLACEMENT VIA TRIP TANK 02:00 - 03:30 1.50 STWHIP P WEXIT CBU WHILE OBTAINING DRILLING PARAMETERS.600 GPM,1700 PSI,60 RPM, { 1.5K FT-LBS TQ.P/U 100K,S/O 107K, ROTATING WT 103K.9.5 PPG MW IN/9.5 PPG MW OUT,TVD 3261,SPR#1 ,20 SPM/220 PSI,30 SPM/275 PSI.OBTAIN ECD BASELINE 9.90.ORIENT AT 60 LOHS AND PASS THROUGH WINDOW WITHOUT ISSUE. 03:30 - 07:30 4.00 DRILL P INT1 STAGE PUMPS UP TO 515 GPM.BEGIN DRILLING NEW FORMATION. DRILL FROM 3305'TO 3775',3749 TVD.550 GPM,1890 PSI, 80 RPM,3-5K TORQUE,5K WOB,ACTUAL ECD 10.25, P/U 110K,S/O 107,ROTATING WT 107K. 07:30 - 09:00 1.50 DRILL P INT1 PUMP OUT OF HOLE FROM 3775'TO BELOW BTM OF WINDOW 3282'MD.550 GPM,1670 PSI.MW 9.5 IN,MW OUT 9.6.PULL THROUGH WINDOW TO 3113'SLOWLY WITH NO PUMPING.WINDOW LOOKS GOOD. 09:00 - 09:30 0.50 DRILL P INT1 MONITOR WELL.BLOW DOWN TOP DRIVE 09:30 - 12:00 2.50 DRILL P INT1 P/U AND SET 9.625 HES RTTS PACKER WITH STORM VALVE AT Tt75'.PULLWEAR BUSHING. Printed 8/9/2011 10:16:28AM wth America -ALASKA- BP Page 28 of 58 Operation Summary Report Common Well Name:K-10 AFE No Event Type: RE-ENTER-ONSHORE(RON) Start Date:4/27/2011 End Date:7/4/2011 X3-00XCJ-C(4,684,455.00) Project: Prudhoe Bay Site: PB K Pad Rig Name/No.: DOYON 25 Spud Date/Time:4/24/2001 12:00:00AM Rig Release: Rig Contractor: DOYON DRILLING INC. UWI:500292176200 Active Datum: K-10C©66.39ft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (ft) 12:00 - 14:30 2.50 DRILL P INT1 RIG UP AND TEST RTTS.250-PSI LO FOR 5 MIN.2000-PSI HI FOR 5 MIN. CHARTED TEST. 14:30 - 19:00 4.50 DRILL P INT1 BEGIN WEEKLY TESTING OF BOPE. JOHN CRISP-AOGCC WAIVED STATES RIGHT TO WITNESS TESTING. TEST BOPE PER • °P AOGCC/BP REQUIREMENTS. TESTED VV FOLLOWING COMPONENTS TO 250-PSI LO/3,500-PSI HI: 13-5/8"ANNULAR PREVENTER, UPPER PIPE RAMS-2-7/8"X 5-1/2"VBR'S, BLIND/SHEAR RAMS,LOWER PIPE RAMS-2/78"X 5-1/2"VBR'S,15 CHOKE MANIFOLD VALVES,UPPER AND LOWER KELLY VALVES, !BOP(DART VALVE), 2-FOSV'S, MANUAL KILL LINE VALVE AND MANUAL CHOKE LINE VALVE,HCR KILL AND HCR CHOKE VALVES. TESTED UPPER AND LOWER VBR'S WITH 4"TEST JOINT. PERFORMED ACCUMULATOR TEST: SYSTEM PRESSURE 3,100-PSI,PRESSURE AFTER CLOSING ALL RAMS AND ANNULAR PREVENTER-1,600-PSI. RECOVERED 1ST 200-PSI-36 SECONDS. FINAL PRESSURE OBTAINED-132 SECONDS. 6 NITROGEN BOTTLES,AVERAGE PRESSURE=2,450-PSI. 19:00 - 20:00 1.00 DRILL P INT1 PER API RP 53--FUNCTION AND RECORD RESPONSE TIME OF ACTIVATION AND FULL CLOSURE FOR LOWER PIPE RAMS-15 SECONDS, BLIND/SHEAR RAMS-20 SECONDS, UPPER PIPE RAMS-15 SECONDS AND ANNULAR-22 SECONDS. 20:00 - 21:00 1.00 DRILL P INT1 PULL TEST PLUG.INSTALL WEAR BUSHING 21:00 - 22:00 1.00 DRILL P INT1 CLEAN AND CLEAR RIG FLOOR. BLOW DOWN LINES AND ALIGN ALL VALVES. HOLD AAR FOR BOP TESTING 22:00 - 23:00 1.00 DRILL P INT1 HOLD PJSM FOR RETRIEVING RTTS AND WELL CONTROL. DISCUSS HAZARD ASSESSMENT FOR R/U WIRELINE. THIRD PARTY RESPONSIBILITIES IN DRILLS/EMERGENCIES. 23:00 - 00:00 1.00 DRILL P INT1 P/U RUNNING TOOL AND SCREW INTO RTTS AT 105'. CLOSE ANNULAR, UNSEAT RTTS, CHECK PRESSURES-STATIC.OPEN BAG MONITOR WELL,PULL RTTS TO FLOOR. 6/2/2011 00:00 - 01:00 1.00 DRILL P INT1 POH AND LAY DOWN 9-5/8"HES RTTS PACKER WITH STORM VALVE. MONITOR WELL VIA TRIP TANK. NO FLOW AND NO LOSSES.MW IN 9.5;MW OUT 9.5 01:00 - 03:30 2.50 DRILL P INT1 CALIBRATE BLOCK HEIGHT. RIG UP HES WIRELINE AND GYRODATA TOOL WHILE MONITORING RETURNS TO THE TRIP TANK. 03:30 - 04:00 0.50 DRILL P INT1 ORIENT TOOLFACE TO 60L.TRIP SLOWLY PAST TOW AT 3265'.PASS THROUGH WINDOW WITHOUT ISSUE.CONTINUE RIH FROM BOW 3,282'TO 3,775'.HOLE LOOKS GOOD. 04:00 - 05:00 1.00 DRILL P INT1 CIRCULATE BOTTOMS UP AT 550-GPM, PSI- 1,620.RECIPROCATE STRING 20 RPM Printed 8/9/2011 10:16:28AM wrth America -ALASKA- BP Page 29 of 58 Operation Summary Report Common Well Name:K-10 ,AFE No Event Type: RE-ENTER-ONSHORE(RON) Start Date:4/27/2011 End Date:7/4/2011 X3-OOXCJ-C(4,684,455.00) Project:Prudhoe Bay Site: PB K Pad Rig Name/No.: DOYON 25 Spud Date/Time:4/24/2001 12:00:00AM Rig Release: Rig Contractor: DOYON DRILLING INC. UWI: 500292176200 Active Datum: K-10C @66.39ft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (ft) 05:00 - 07:30 2.50 DRILL P INT1 BLOW DOWN TD. RIH WITH GYRODATA TOOL.TAKE GYRO SURVEYS FOR NEW HOLE THAT WAS PREVIOUSLY DRILLED.MONITOR WELL ON TRIP TANK WHILE RUNNING GYRO. 07:30 - 12:00 4.50 DRILL P INT1 DIRECTIONAL DRILL 8-1/2"INTERMEDIATE HOLE FROM 3,775'TO 4,123'-MD 4,018'-TVD -PUW 118K,SOW 115K, ROT 114K -553 GPM,1,720 PSI OFF,1,850 PSI ON -80 RPM,TQ 2.2K OFF,4K ON -WOB 5-10K -CALCULATED CLEAN HOLE ECD 9.89, ACTUAL ECD 10.13 -AST 0.78, ART 0.33,ADT 1.11,TOTAL BIT HRS 2.53,JARS 2.53 -9.45 PPG MUD WT IN,9.5 PPG MUD WT OUT -SPR'S 3775'-MD TVD-3748' #1 MP 20-SPM 190-PSI 30-SPM 250-PSI . #2MP 20-SPM 190-PSI 30-SPM 250-PSI 12:00 - 00:00 12.00 DRILL P INT1 CONTINUE DIRECTIONAL DRILLING FROM FROM 4,123'TO 4,913'-MD, 4,817-TVD 4870'-MD, REDUCE FLOW TO 600 TO SUSTAIN DLS. PUW 129K,SOW 122K,ROT 124K -600 GPM,2,150 PSI OFF,2,350 PSI ON -80 RPM,TQ 3K OFF,6K ON -WOB 5-10K -CALCULATED CLEAN HOLE ECD 9.90, ACTUAL ECD 10.04, -AST 2.09, ART 1.74,ADT 3.83,TOTAL BIT HRS 6.36,JARS 6.36 -SPR'S 4913'-MD TVD-4817' MW-9.4 #1 MP 20-SPM 220-PSI 30-SPM 295-PSI #2MP 20-SPM 225-PSI 30-SPM 300-PSI 6/3/2011 00:00 - 10:30 10.50 DRILL P INT1 CONTINUE DIRECTIONAL DRILLING FROM FROM 4,913'TO 5,959'-MD,TVD-5,457 -PUW 145K,SOW 120K, ROT 127K -650 GPM,2,810 PSI OFF,3,060 PSI ON -80 RPM,TQ 5K OFF,7K ON -WOB13K -CALCULATED CLEAN HOLE ECD 9.91, ACTUAL ECD 10.27 -AST 2.36, ART 1.79,ADT 4.15,TOTAL BIT HRS 10.51,JARS 10.51 -SPR'S 5,482'-MD TVD-5,215' MW-9.4 PPG #1MP 20-SPM 230-PSI 30-SPM 310-PSI #2MP 20-SPM 225-PSI 30-SPM 310-PSI 10:30 - 11:00 0.50 DRILL P INT1 RACK BACK ONE STAND IN DERRICK. TROUBLESHOOT MUD PUMP 2 DRIVE FAULT. ROTATE AND RECIPROCATE DRILL STRING WHILE TROUBLESHOOTING. -530 GPM, 2,150 PSI -80 RPM,TQ 3-4K, 11:00 - 11:30 0.50 DRILL P INT1 PILL PIT OVERFILLED DUE TO REMOTE ACTUATED CONTROL VALVE NOT CLOSING COMPLETELY.THIS RESULTED IN 12 BBLS OVERFLOWING INTO SECONDARY CONTAINMENT INSIDE CONFINES OF PIT MODULE. Printed 8/9/2011 10:16:28AM wth America -ALASKA- BP Page 30 of 58 Operation Summary Report Common Well Name: K-10 AFE No • Event Type: RE-ENTER-ONSHORE(RON) Start Date:4/27/2011 End Date: 7/4/2011 X3-00XCJ-C(4,684,455.00) Project: Prudhoe Bay Site: PB K Pad Rig Name/No.: DOYON 25 Spud Date/Time:4/24/2001 12:00:00AM Rig Release: Rig Contractor: DOYON DRILLING INC. UWI:500292176200 Active Datum: K-10C @66.39ft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (ft) 11:30 - 12:00 0.50 DRILL P INT1 CONTINUE TO TROUBLESHOOT MUD PUMP 2, DRIVE FAULT.ROTATE AND RECIPROCATE DRILL STRING WHILE TROUBLESHOOTING. -530 GPM, 2,150 PSI -80 RPM,TQ 3-4K, 12:00 - 16:30 4.50 DRILL P INT1 CONTINUE DIRECTIONAL DRILLING FROM FROM 5,959'TO 6,241'-MD.WORK TIGHT AREA AT 6,077'-MD, TVD 5517-TVD.JAR PIPE FREE. -PUW 159K,SOW 121K,ROT 128K -640 GPM,2,950 PSI OFF,3,300 PSI ON -90 RPM,TQ 5K OFF,7K ON -WOB 13K -CALCULATED CLEAN HOLE ECD 9.93, ACTUAL ECD 10.01 -AST 0.74, ART 3.54,ADT 4.28,TOTAL BIT HRS 14.79,JARS HRS 14.79 -SPR'S 6,144'-MD TVD-5,552' MW-9.5 PPG #1MP 20-SPM 240-PSI 30-SPM 310-PSI #2MP 20-SPM 260-PSI 30-SPM 310-PSI 16:30 - 17:30 1.00 DRILL P INT1 CIRCULATE HOLE CLEAN,ROTATE AND RECIPROCATE AT 6,241'-MD -645 GPM,3,070 PSI -80 RPM,TQ 7K MONITOR WELL(STATIC) 17:30 - 18:00 0.50 DRILL N RREP 6,240.99 INT1 TROUBLESHOOT MUD PUMP 2 VFD DRIVE PROBLEM. 18:00 - 00:00 6.00 DRILL P INT1 CONTINUE DRILLING FROM 6,241'TO 6810'- MD, TVD 5,892' -PUW 136K,SOW 123K,ROT 131K -640 GPM,3,150 PSI OFF,3,450 PSI ON -90 RPM,TQ 5K OFF,7K ON -WOB 8K -CALCULATED CLEAN HOLE ECD 9.90, ACTUAL ECD 10.12 -AST 0.74, ART 3.54,ADT 4.28,TOTAL BIT HRS 14.79,JARS HRS 14.79 -SPR'S 6,619'-MD TVD-5,794' MW-9.5 PPG #1MP 20-SPM 280-PSI 30-SPM 340-PSI #2MP 20-SPM 270-PSI 30-SPM 350-PSI 6/4/2011 00:00 - 12:00 12.00 DRILL P INT1 CONTINUE DIRECTIONAL DRILLING FROM 6,810'TO 7,852'-MD.TVD 6,427' -PUW 185K,SOW 125K,ROT 140K -648 GPM, PSI OFF 3,460, PSI ON 3,650 -100 RPM,TQ 7K OFF, 9K ON -WOB 8K -CALCULATED CLEAN HOLE ECD 9.94, ACTUAL ECD 10.01 PUMP 35 BBL,9.4 PPG,170 VIS SWEEP AT 7,000'-MD 25%CUTTING INCREASE SEEN AT SURFACE UPON RETURN. -AST 0.17, ART 6.15,ADT 6.32,TOTAL BIT HRS 21.11,JARS HRS 21.11 -SPR'S 7,663'-MD TVD-6,328' MW-9.4 PPG #1 MP 20-SPM 320-PSI 30-SPM 410-PSI #2MP 20-SPM 320-PSI 30-SPM 410-PSI 12:00 - 20:00 8.00 DRILL P INT1 CONTINUE DRILLING FROM 7,852'TO 8,504'- MD.TVD 6,797' -MUD PUMP 2,PRESSURE RELIEF VALVE RELEASED(POP OFF)AT 3,980-PSI. Printed 8/9/2011 10:16:28AM )rth America-ALASKA BP Page 31 of 58 Operation Summary Report Common Well Name: K-10 AFE No Event Type: RE-ENTER-ONSHORE(RON) Start Date:4/27/2011 End Date: 7/4/2011 X3-00XCJ-C(4,684,455.00) Project:Prudhoe Bay Site: PB K Pad Rig Name/No: DOYON 25 Spud Date/Time:4/24/2001 12:00:00AM Rig Release: Rig Contractor: DOYON DRILLING INC. UWI: 500292176200 Active Datum: K-10C @66.39ft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (ft) 20:00 - 21:30 1.50 DRILL N RREP 8,503.98 INT1 WHILE PICKING UP OFF BOTTOM TO INVESTIGATE PRESSURE LOSS,RIG GENERATOR POWER LOSS WAS EXPERIENCED.WELL WAS MONITORED WITH ASSIGNED INDIVIDUALS. TROUBLESHOOT GENERATORS POWER LOSS. LOW FUEL PRESSURE LEVEL SENSORS HAD INITIATED THE SHUT DOWN. BRING GENERATORS AND ALL RIG SYSTEMS BACK ON-LINE.STAGE MUD PUMP 1 UP, RECIPROCATE STRING WHILE REPAIRING MUD PUMP 2 POP OFF. -420 GPM,1,950 PSI. -100 RPM,TQ9K 21:30 - 23:00 1.50 DRILL P INT1 REPLACE MUD PUMP 2 POP OFF.SET RELEASE PRESSURE OF POP OFF TO 4300 PSI.CIRCULATE AND RECIPROCATE THROUGHT REPAIR. -420 GPM,1,950 PSI. -100 RPM,TQ 9K. 23:00 - 00:00 1.00 DRILL P INT1 CONTINUE DRILLING FROM 8,504'TO 8,610'- MD.TVD 6,860' -PUW 197K,SOW 129K,ROT 143K -640 GPM, PSI OFF 3,680, PSI ON 3,980 -100 RPM,TQ 9K OFF,12K ON -WOB 8K -CALCULATED CLEAN HOLE ECD 10.06, ACTUAL ECD 10.09 -AST 0.16, ART 5.12,ADT 5.28,TOTAL BIT HRS 26.39,JARS HRS 26.39 -SPR'S 8,516-MD TVD-6,803' MW-9.4 PPG #1 MP 20-SPM 350-PSI 30-SPM 480-PSI #2MP 20-SPM 360-PSI 30-SPM 450-PSI 6/5/2011 12:00 - 18:30 6.50 DRILL P INT1 DIRECTIONAL DRILLING FROM 8,610'TO 9,558'-MD. TVD 7,555' -600 GPM, PSI OFF 3,660, PSI ON 3,880 -100 RPM,11K ON,TQ 9-10K OFF -WOB 10-15K -PUW 215K -SOW 138K -RTW 159K -MW IN 9.45 PPG,OUT 9.45 PPG, -CALCULATED ECD 9.95, ACTUAL ECD 10.03 AST 3.32, ART 6.61,ADT 9.93, BIT HRS 36.32, JAR HRS 36.32 SPR'S 9,366'-MD TVD-7,388' MW-9.45 PPG #1 MP 20-SPM 350-PSI 30-SPM 490-PSI #2MP 20-SPM 350-PSI 30-SPM 480-PSI 18:30 - 22:00 3.50 DRILL P INT1 CIRCULATE HOLE CLEAN,3 BTM UP TOTAL. START OF CIRCULATION ECD 9.99, END 9.97. CALCULATED 9.95. RACK BACK A STAND EACH 30 MIN.TO 9,082'-MD. -600 GPM, PSI 3680,TQ 11K,100 RPM -PUW 215K -SOW 136K TAKE DIRECTIONAL SURVEYS AT 9,336', 9,304',9,147',9,115'-MD 22:00 - 22:30 0.50 DRILL P INT1 MONITOR WELL FOR 10 MINUTES,STATIC. LINE UP HOLE FILL AND TRIP TANK. Printed 8/9/2011 10:16:28AM ■rth America -ALASKA- BP Page 32 of 58`' Operation Summary Report Common Well Name:K-10 AFE No Event Type: RE-ENTER-ONSHORE(RON) Start Date:4/27/2011 End Date:7/4/2011 X3-00XCJ-C(4,684,455.00) Project:Prudhoe Bay Site:PB K Pad Rig Name/No.:DOYON 25 Spud Date/Time:4/24/2001 12:00:00AM Rig Release: Rig Contractor: DOYON DRILLING INC. UWI:500292176200 Active Datum: K-10C @66.39ft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (ft) 22:30 - 00:00 1.50 DRILL P INT1 POOH ON ELEVATORS FROM 9,082'TO 8,613' -MD. PUW 200,SOW 138, FILL VOLUMES CORRECT.MONITOR WELL FOR 10 MIN. PUMP 25 BBL,11.1 PPG DRY JOB.220 GPM, 800 PSI. BLOW DOWN TD,CONTINUE POOH. 6/6/2011 00:00 - 06:00 6.00 DRILL P INT1 POOH ON ELEVATORS TO WINDOW AT 3,265' -MD. -MW IN 9.45 PPG,MW OUT 9.45 PPG. 20K OVER PULL AT 5,494'-MD.WORK AND WIPE THROUGH SAME AREA,OK THEREAFTER.CONTINUE POOH. NO OTHER TROUBLE AREAS.6 BBLS LOST OVER CALCULATED FILL.HOLE TAKING CALCULATED 1 BPH.MONITOR WELL AT WINDOW 3,265'-MD(STATIC) 106:00 - 07:00 1.00 DRILL P INT1 CIRCULATE BTMS UP WHILE RECIPROCATING FROM 3,113'TO 3,021'-MD. -GPM 648, PSI 2320 -RPM 15,TQ 2K 07:00 - 09:30 2.50 DRILL P INT1 MONITOR WELL(STATIC).M/U AND SET HES 9-5/8"RTTS WITH STORM VALVE 101'BELOW ROTARY TABLE, BIT DEPTH 3,217'-MD. TEST PACKER TO 250 PSI LOW/2,000 PSI HIGH. TEST GOOD. 09:30 - 11:00 1.50 DRILL P INT1 PICK UP TEST JOINT AND PULL WEAR BUSHING. R/U BOPE TEST EQUIPMENT,FILL BOPE AND LINES. 11:00 - 15:00 4.00 DRILL P INT1 BEGIN WEEKLY TESTING OF BOPE. JEFF JONES-AOGCC WAIVED STATES RIGHT TO WITNESS TESTING. TEST BOPE PER AOGCC/BP REQUIREMENTS. TESTED FOLLOWING COMPONENTS TO 250-PSI LOW/ 3,500-PSI HIGH: 13-5/8"ANNULAR 6°r PREVENTER,UPPER PIPE RAMS 2-7/8"X 5-1/2"VBR'S, BLIND/SHEAR RAMS,LOWER PIPE RAMS-2/78"X 5-1/2"VBR'S,15 CHOKE 1(17 MANIFOLD VALVES,UPPER AND LOWER KELLY VALVES, IBOP(DART VALVE), 2-FOSV'S,MANUAL KILL LINE VALVE AND MANUAL CHOKE LINE VALVE, HCR KILL AND HCR CHOKE VALVES. TESTED UPPER AND LOWER VBR'S WITH 4"TEST JOINT.TEST SUPER CHOKE 250 LOW/2,000 HIGH. PERFORMED ACCUMULATOR TEST: SYSTEM PRESSURE 3,000-PSI,PRESSURE AFTER CLOSING ALL RAMS AND ANNULAR PREVENTER-1,650-PSI. RECOVERED 1ST 200-PSI-34 SECONDS. FINAL PRESSURE OBTAINED-137 SECONDS. 6 NITROGEN BOTTLES,AVERAGE PRESSURE=2,540-PSI. -PER API RP 53--FUNCTION AND RECORD RESPONSE TIMES OF ACTIVATION AND FULL CLOSURE FOR LOWER PIPE RAMS-19 SECONDS, BLIND/SHEAR RAMS-24 SEC, UPPER PIPE RAMS-19 SEC AND ANNULAR- 22 SEC, HCR CHOKE-2 SEC, HCR KILL-3 SEC. 15:00 - 16:00 1.00 DRILL P INT1 PULL TEST PLUG. BLOW DOWN CHOKE LINE, KILL LINE AND TD. R/D ALL TEST EQUIPMENT. INSTALL WEAR RING. CLEAN AND CLEAR RIG FLOOR. Printed 8/9/2011 10:16:28AM )rth America -ALASKA BP Page 33 of 58 Operation Summary Report Common Well Name:K-10 AFE No Event Type: RE-ENTER-ONSHORE(RON) Start Date:4/27/2011 End Date: 7/4/2011 X3-00XCJ-C(4,684,455.00) Project:Prudhoe Bay Site: PB K Pad Rig Name/No.: DOYON 25 Spud Date/Time:4/24/2001 12:00:00AM Rig Release: Rig Contractor: DOYON DRILLING INC. UWI:500292176200 Active Datum:K-10C @66.39ft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) ft 16:00 - 19:30 3.50 DRILL P ._ INT1 CHANGE OUT 4"HT-38 TOP DRIVE SAVER SUB. 19:30 - 21:00 1.50 DRILL P ■- INT1 VISUAL AND SERVICE H ,CROWN AND ND POWER SLIPS.SLIPS.TROUBLE-SHOOOT TOP DRIVE SHOT PIN FOR PIPE HANDLER LOCK. 21:00 - 22:00 1.00 DRILL P ■- INT1 ANDDOAR TEON ST.CHANGING WITH HES SAVER SUB AND BOPE TEST.PJSM WITH HES REP. FOR RETRIEVING RTTS. 22:00 - 22:30 0.50 DRILL P INT1 M/U HES RTTS RUNNING TOOL, P/U STAND, RIH AND M/U FOSV.TAG TOP OF RTTS AT 101'-MD.ATTEMPT TO STING/SCREW INTO RTTS(NO-GO).M/U TD AND CIRCULATE AT TOP OF RTTS AT 3 BPM,50 PSI TO FLUSH SUSPECTED DEBRIS FROM ATOP RTTS. SUCCESSFUL,SCREW INTO RTTS WITH 21 RIGHT TURNS.CLOSE ANNULAR PREVENTER,P/U RELEASE RTTS.PUW 112K. VERIFY ANNULAR PSI AND DP PSI READING ZERO.OPEN ANNULAR PREVENTOR AND FILL HOLE. HOLE TOOK 7 BBL TOTAL. CALCULATED LOSS OF 1.5 BPH. 22:30 - 00:00 1.50 DRILL P - INT1 POOH ONE STAND,BREAK AND L/D 9-5/8" RTTS.CLEAR FLOOR OF SAME. 6/7/2011 00:00 - 01:30 1.50 DRILL P INT1 BLOW DOWN CHOKE MANIFOLD AND KILL LINE.TIH FROM 3,115'TO TOP OF WINDOW 3,265'-MD 01:30 - 03:00 1.50 DRILL P INT1 PRIOR TO ENTERING OPEN HOLE.FINISH WITH REMOVAL OF METAL BRACKET-RING IN CUTTINGS PIT. 03:00 - 10:30 7.50 DRILL P INT1 RIH FROM TOP OF WINDOW 3,265'TO 8,622' -MD. HOLE LOOKS GOOD,TRIP WAS CLEAN TO 8,622'-MD. FILL DP EACH 20 STANDS. TAKE DEVIATION SURVEYS AT BIT DEPTHS 3,899'3,929'5,040'5,071' -MW IN 9.5, MW OUT 9.5. 10:30 - 11:30 1.00 DRILL P INT1 CIRCULATE BTMS UP AT 8,622'-MD -GPM 540,3350 PSI.435 BBLS PUMPED.4325 STROKES. WORK THROUGH TROUBLE AREA 8,622'-MD. 5 BBL LOSS TO FORMATION WHILE CIRCULATING AND WORKING STRING ENCOUNTER 3%FLOW INCREASE AT BTMS UP 2,400 STKS.SHUT DOWN AND MONITOR THE WELL.STATIC, NO RETURN FLOW, SLIGHT INDICATIONS OF GAS BREAKING OUT. CONTINUE TO CIRCULATE 3-BPM,600 PSI MONITORING RETURNS AND VOLUMES CLOSELY. -MW IN 9.5,MW OUT 9.5 ii 11:30 - 14:30 3.00 DRILL P INT1 RIH FROM 8,622'TO 9'267'REAM AND WORK TIGHT SPOT AT 9,267'-MD -PUW 214K SOW 127K WASH AND REAM DOWN FROM 9,267'TO 9,558'-MD -GPM 500, PSI 3,200 -RPM 80, TQ 10-13K Printed 8/9/2011 10:16:28AM )rth America -ALASKA- BP Page 34 of 58 Operation Summary Report . .;. Common Well Name:K-10 AFE No Event Type: RE-ENTER-ONSHORE(RON) Start Date:4/27/2011 End Date:7/4/2011 X3-00XCJ-C(4,684,455.00) Project:Prudhoe Bay Site: PB K Pad Rig Name/No.:DOYON 25 Spud Date/Time:4/24/2001 12:00:00AM Rig Release: Rig Contractor:DOYON DRILLING INC. UWI:500292176200 Active Datum:K-10C @66.39ft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (ft) 14:30 - 15:30 1.00 DRILL P INT1 CIRCULATE BTMS UP 9,459'-MD -GPM 535, PSI 3,370 -RPM 90, TQ 12-16K -CALCULATED CLEAN ECD 9.95, ACTUAL ECD 10.27 MONITOR WELL(STATIC).PREPARE TO INCREASE MW TO 10.2 PPG 15:30 - 17:30 2.00 DRILL P INT1 INCREASE MW FROM 9.5 TO 10.2 PPG. CIRCULATE-GPM 336, PSI 1,670. INCREASE RATE AS ABLE TO 505 GPM,3,140 PSI. MONITOR WELL WITH 10.2 PPG MUD SURF. TO SURF.(STATIC).OBTAIN NEW SPR'S 17:30 - 00:00 6.50 DRILL P INT1 DIRECTIONALLY DRILL FROM 9,558'TO 9,789'- MD.TVD 7,763' -PUW 220K,SOW 140K,ROT 160K -560 GPM,3,660 PSI OFF,3,880 PSI ON -100 RPM,TQ 10K OFF,12K ON -WOB 7-10K -CALCULATED CLEAN HOLE ECD 10.69, ACTUAL ECD 10.79 -AST 2.40, ART 1.04,ADT 3.44,TOTAL BIT HRS 39.76,JARS HRS 39.76 9,558'-MD TVD-7,554' MW-10.2 PPG #1 MP 20-SPM 400-PSI 30-SPM 510-PSI #2MP 20-SPM 400-PSI 30-SPM 510-PSI 6/8/2011 00:00 - 10:00 10.00 DRILL P INT1 DIRECTIONALLY DRILL FROM 9,789'TO ✓ 10,264'-MD. TVD 8,187' -PUW 250K,SOW 142K,ROT 176K -550 GPM, PSI OFF 3,660, PSI ON 3,850 -90 RPM,TQ OFF 12K,TQ ON 14K -WOB 12K -CALC. CLEAN HOLE ECD 10.60,ACTUAL ECD 10.71 09:00 HRS. LEAK DEVELOPED IN AIR BOOT ON FLOW-LINE CAUSING 30 GAL. LSND DRILLING MUD TO LEAK ON BOP DECK, (CLASSIFIED AS LEAK); SEE REMARKS. 9,657'-MD TVD-7,663' MW-10.2 PPG #1 MP 20-SPM 390-PSI 30-SPM 480-PSI #2MP 20-SPM 380-PSI 30-SPM 490-PSI 10:00 - 12:00 2.00 DRILL P INT1 RT,RECIPROCATE WHILE CBU FOR SAMPLES FROM TD 10,264'-MD TO PICK CASING POINT. -GPM 553, PSI 3620, RPM 90,TQ 12K DRILL ADDITIONAL 7 FT TO 10,271'-MD 11) 12:00 - 15:30 3.50 DRILL P INT1 DRILL ADDITIONAL 5 FT FROM 10,271'TO • 10,276'-MD, TVD 8,197' CIRCULATE BTMS UP FOR SAMPLES AND TO CLEAN HOLE FOR SHORT TRIP. TO_FOR 8-1/2"INTERMEDIATE SECTION CALLED AT 10,276'-MD, TVD 8,197' -PUW 250K,SOW 142K,ROT 176K -GPM 553, PSI OFF 3,620, PSI ON 3,860 RPM 90,TQ 12K AST 1.62,ART 4.66,ADT 6.28, BIT HRS 46.04, JAR HRS 46.04 CALC. ECD 10.60, ACTUAL ECD 10.65 Printed 8/9/2011 10:16:28AM )rth America -ALASKA- BP Page 35 of 58 Operation Summary Report Common Well Name: K-10 AFE No Event Type: RE-ENTER-ONSHORE(RON) Start Date:4/27/2011 End Date: 7/4/2011 X3-00XCJ-C(4,684,455.00) Project: Prudhoe Bay Site: PB K Pad Rig Name/No.: DOYON 25 Spud Date/Time:4/24/2001 12:00:00AM Rig Release: Rig Contractor: DOYON DRILLING INC. UWI:500292176200 Active Datum: K-10C @66.39ft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (ft) 15:30 - 21:00 5.50 DRILL P INT1 MONITOR WELL 10 MIN.POOH FROM 10,276' TO 8,970-MD.PUMPING OUT AT 3 BPM. -126 GPM(3 BPM), 440 PSI, -MW IN 10.2,MW OUT 10.2 WORK PIPEANDWIPETIGHTAREAAT 10,220'-MD ATTEMPT TO POOH ON ELEVATORS FROM 8,970',30K OVERPULL AT 8,950'-MD. UNABLE TO WORK PAST SAME. RIH TO 9,182'-MD ESTABLISH CIRCULATION.STAGE TO DRILLING RATE 21:00 - 22:00 1.00 DRILL P INT1 CIRCULATE BTM UP AT 9,182'-MD.RT AND RECIPROCATE WHILE CIRC.REDUCE GPM, RPM WHEN SLACKING OFF. -PUW 202K,SOW 137K,ROT 143K -600 GPM,3,750 PSI,100 RPM,TQ 10-11K -30%INCREASE IN CUTTING SEEN AT SURFACE 1/2 WAY THROUGH BTMS UP. NO ADDITIONAL INCREASE SEEN AT B/U. 22:00 - 00:00 2.00 DRILL P INT1 BACK REAM POOH AT DRILLING RATE. FROM 9,182 TO 8,613'-MD NO ISSUES WHILE BACK-REAMING. -PUW 142K,SOW 129K,ROT 138K. -575 GPM, PSI 3490, RPM 100,TQ 7-10K 6/9/2011 00:00 - 02:00 2.00 DRILL P INT1 RIH FROM 8,613'TO 10,176'-MD.WASH LAST STAND TO BTM AT 10,276'-MD. -PUW 192K,SOW 124K TRIP IN WAS CLEAN. -MW IN 10.2 PPG,MW OUT 10.3 PPG SPR 10,276'-MD TVD-8,197' MW-10.3 PPG #1MP 20-SPM 370-PSI 30-SPM 470-PSI #2MP 20-SPM 370-PSI 30-SPM 470--PSI 02:00 - 04:30 2.50 DRILL P INT1 C&C HOLE.PUMP 39 BBL SWEEP 10.2 PPG/ 100 VIS S/S.AT 10,276'-MD.NOTED INCREASE IN CUTTINGS WITH SWEEP TO SURF. -GPM 540, PSI 3,680 -RPM 90,TQ 13K PUMP SECOND SWEEP S/S 30%INCREASE IN CUTTINGS AT SURF. MONITOR WELL PRIOR TO PUMPING POOH. 04:30 - 09:00 4.50 DRILL P INT1 PUMP AT 3 BPM POOH FROM 10,276'TO 9,371'-MD.THRZ AT 9,644'-MD. -MW IN 10.3 PPG,MW OUT 10.3 PPG. -PUW 252K,SOW 136K -GPM 126, PSI 475 TRIP OK,INTERMITTENT OVER-PULLS THROUGH HRZ. 109:00 - 09:30 0.50 DRILL P INT1 POOH ON ELEVATORS F/9,371 TO 9,182'-MD. TRIP CLEAN, HOLE FILL VOLUME CORRECT. -PUW 144K,SOW 115K. -MW IN 10.3 PPG,MW OUT 10.3PPG _ 09:30 - 14:00 4.50 DRILL N RREP 9,181.98 INT1 CIRC.AT 280 GPM, PSI 1,110 WHILE TROUBLESHOOTING IRON DERRICK MAN (IDM).C/O ENCODER CABLE TO IDM. -WHILE REPAIR IS COMPLETED SERVICE TD, BLOCKS&CROWN.PJSM FOR POOH TO _ WINDOW.MONITOR WELL(STATIC). Printed 8/9/2011 10:16:28AM -rth America -ALASKA- BP Page 36 of 58 Operation Summary Report Common Well Name:K-10 AFE No Event Type: RE-ENTER-ONSHORE(RON) Start Date:4/27/2011 End Date:7/4/2011 X3-00XCJ-C(4,684,455.00) Project:Prudhoe Bay Site:PB K Pad Rig Name/No.: DOYON 25 Spud Date/Time:4/24/2001 12:00:00AM Rig Release: Rig Contractor: DOYON DRILLING INC. UWI:500292176200 Active Datum:K-10C @66.39ft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations f (hr) (ft) 14:00 - 21:30 7.50 DRILL P INT1 POOH F/9,182 TO 8,898'-MD.PULLED CLEAN, NO ISSUES. MONITOR WELL(STATIC).PUMP 25 BBL DRY JOB.B/D TD.CONTINUE POOH TO WINDOW AT 3,265'-MD.MONITOR WELL(STATIC) AT WINDOW PUW 101K,SOW 107 -MW IN 10.3 PPG,MW OUT 10.3 PPG NO ISSUES WHEN GHOST-REAMER OR BHA ENTERED CASING.HOLE FILL VOLUME CORRECT. 21:00 HRS. D1 DRILL:(SIMULATED)KICK WHILE TRIPPING.GOOD PARTICIPATION& EXECUTION BY ALL TEAM MEMBERS. 21:30 - 22:30 1.00 DRILL P INT1 CIRC.2 B/U. ROTATE&RECIPROCATE F/ 3,210'TO 3,115'-MD. -PUW 101K,SOW 107K,RTW 96K -GPM 626, PSI 2,270 -RPM 100,TQ 2K 22:30 - 23:30 1.00 DRILL P INT1 MONITOR WELL(STATIC).PUMP 12 BBL DRY JOB. DROP DRIFT DOWN DP TO DRIFT FOR UPCOMING CEMENT JOB.• 23:30 - 00:00 0.50 DRILL P INT1 POOH ON ELEVATORS F/3,210'TO 2,357'-MD. HOLE FILL VOLUME CORRECT.TRIP WAS CLEAN -MW IN 10.3 PPG,MW OUT 10.3 PPG. 6/10/2011 00:00 - 02:00 2.00 DRILL P INT1 POOH ON ELEVATORS F/2,357'TO BHA. MONITOR WELL 10 MIN.(STATIC). MW IN 10.3 PPG,MW OUT 10.3 PPG. 02:00 - 04:00 2.00 DRILL P INT1 STAND BACK 4"HWDP.LID BHA#7 F/365'TO MWD AT 83'. 04:00 - 05:00 1.00 DRILL P INT1 DOWN LOAD MWD ON FLOOR. 05:00 - 06:30 1.50 DRILL P INT1 CONTINUE TO LID BHA F/83'TO SURFACE. CLEAN&CLEAR FLOOR. 06:30 - 08:00 1.50 DRILL P INT1 PUMP OUT BOP STACK, P/U TEST JT,PULL WEAR RING,SET TEST PLUG. 08:00 - 10:30 2.50 DRILL P INT1 CHANGE UPPER PIPE RAMS TO.5"X 7" VARIABLES,_ - 10:30 - 11:00 0.50 DRILL P INT1 R/U&TEST UPPER PIPE RAMS.250/3500 PSI FOR 5/10 CHARTED MINUTES. TOP PIPE RAMS CLOSING TIME 22 SECONDS TOTAL.PUMP OUT BOP STACK,PULL TEST PLUG,INSTALL WEAR RING 9-1/16"ID. 11:00 - 12:00 1.00 DRILL P INT1 R/U 7"CSG HANDLING EQUIP.MONITOR WELL ON TRIP TANK.1.5 BPH LOSS RATE. 12:00 - 19:00 7.00 DRILL P INT1 M/U CEMEMT HEAD&UD SAME TO PIPE-SHED.LID DRLG BAILS,M/U FRANKS FILL UP TOOL.R/U CSG STABBING BOARD. M/U 7"VAM TOP XO TO FOSV.MOVE POWER TONGS TO ODS.MOVE 6 STANDS TO DS TO MAKE ROOM FOR POWER TONGS. 19:00 - 21:00 2.00 DRILL P INT1 PJSM FOR RUNNING 7"LINER-RE-ROUTE STABBING BOARD HYD HOSES. Printed 8/9/2011 10:16:28AM )rth America -ALASKA- BP Page 37 of 58 Operation Summary Report Common Well Name:K-10 AFE No Event Type: RE-ENTER-ONSHORE(RON) Start Date:4/27/2011 End Date:7/4/2011 X3-00XCJ-C(4,684,455.00) Project: Prudhoe Bay Site: PB K Pad Rig Name/No.: DOYON 25 Spud Date/Time:4/24/2001 12:00:00AM Rig Release: Rig Contractor: DOYON DRILLING INC. UWI:500292176200 Active Datum: K-10C @66.39ft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (ft) 21:00 - 00:00 3.00 DRILL P INT1 P/U 7"26 PPF,SHOE TRACK. BAKER-LOK SHOE TRACK CONNECTIONS&MAKE UP �7 BTC-M TO MARK.M/U SHOE TRACK TO MARK. FILL AND CHECK FLOAT.CONTINUE RIH FILLING EACH JT.TOP OFF EACH 10 JTS. RIH TO 816'-MD.HOLE STILL TAKING 7 BPH STATIC LOSS. PUW 48K,SOW 54K 7"VAM TOP M/U TQ 11950 FT/LBS,USE JET LUBE SEAL GAURD. 6/11/2011 00:00 - 02:00 2.00 DRILL P INT1 CONTINUE RUNNING 7"26#, HC VAM TOP LINER PER PROGRAM. M/U TQ 11,950 FT/LBS. FILL EACH JT,OBTAIN PUW,SOW EVERY 10 JT. -SIMULATED KICK WHILE TRIPPING DRILL (D1).WITH 7"CSG. INSTALL FOSV.MONITOR WELL LOSSES 1.5 BPH.HOLD TABLETOP DISCUSSION IN REGARDS TO PSI/JACKING FORCE. DISCUSS POSSIBLE SCENERIOS REQUIRING OTHER EQUIP.SHEAR JT.OR CHANGING OF ELEVATORS.TOOL BOX MEETING, DISCUSS ANY ADJUSTMENTS NEEDED FOR IMPROVING SAFETY OR EFFICIENCY. 02:00 - 05:00 3.00 DRILL P INT1 CONTINUE RIH W/7"LINER F/816'TO 2,382' MD. HOLE TAKING 7 BBL PER 10 JT.MONITOR MUD PROPERTIES&DISPLACEMENTS. MW IN 10.3, MW OUT 10.3 05:00 - 06:30 1.50 DRILL P INT1 C&C MUD, RECIPROCATE CSG AT 2,382'-MD. STAGE PUMP UP. -GPM 208,5 BPM, PSI 450, -PUW 118,SOW 109 171 TOTAL BBLS PUMPED. 06:30 - 08:00 1.50 DRILL P INT1 CONTINUE RIH W/7"LINER F/2,382'TO 3,242' -MD,JUST ABOVE TOW AT 3,265'. FILL EACH JT&MONITOR FLO SHOW FOR CHANGES IN HOLE CONDITIONS. -PUW 154K, SOW 136K 08:00 - 09:30 1.50 DRILL P INT1 C&C MUD, RECIPROCATE CSG AT 3,242'-MD. STAGE PUMP UP. -GPM 231, 5.5 BPM, PS1465, 253 BBLS PUMPED TOTAL. 09:30 - 20:00 10.50 DRILL P INT1 RIH WITH 7"LINER F/3,242 TO 6,564'-MD. BREAK CIRC EACH 10 JT.MONITORING DISP. -PUW 216,SOW 135 NOTED INCREASE MW OUT 10.6&VIS. 150+ SLACK OFF WT DECREASE W/INCREASE IN P/U. 20:00 - 00:00 4.00 DRILL P INT1 AT 6,564'-MD ESTABLISH CIRC.STAGE UP PUMP,MONITORING RETURNS&PSI TO STAGE UP RATES.C&C MUD TO REDUCE VIS AND CLEAN HOLE. 1 BPM, PSI 620 -1.5 BPM PSI 520 - 2.0 BPM PSI 540- 3.2 BPM, PSI 600 RECIP CSG THROUGHOUT CIRCULATION- PUW 210,SOW 137 AFTER CIRC.MW 10.3 OUT,48 VIS OUT. Printed 8/9/2011 10:16:28AM )rth America -ALASKA- BP Page 38 of 58 Operation Summary Report Common Well Name:K-10 AFE No Event Type: RE-ENTER-ONSHORE(RON) Start Date:4/27/2011 End Date: 7/4/2011 X3-00XCJ-C(4,684,455.00) Project: Prudhoe Bay Site: PB K Pad Rig Name/No.:DOYON 25 Spud Date/Time:4/24/2001 12:00:00AM Rig Release: Rig Contractor:DOYON DRILLING INC. UWI:500292176200 Active Datum:K-10C©66.39ft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (ft) 6/12/2011 00:00 - 01:00 1.00 DRILL P INT1 CONTINUE TO CIRC WASH IN HOLE F/6,688 TO 6,729'-MD STAGE PUMP INCREMENTS OF 1/2 BBL ACCORDING TO PSI&RETURNS. MONITOR FOR LOSSES. MW IN 10.3 PPG,MW OUT 10.3 PPG -PUW 215K,SOW 155K. -GPM 168(4 BPM), FCP 450. 134 GPM, PSI 600. _ 01:00 - 02:00 1.00 DRILL P - INT1 CONTINUE RIH ON ELEVATORS F/6,729'TO 6,895'-MD. 02:00 - 04:30 2.50 DRILL P INT1 WASH IN HOLE F/6,895 TO 7,141'-MD.STAGE UP PUMP 1/2 BBL INCREMENTS. -PUW 215K,SOW 155 -GPM 168(4,BPM),FCP 430. MONITOR WELL AFTER WASHING DN LAST JT OF 7"LINER(STATIC). R/D 7"CSG EQUIP.R/U NECESSARY XO'S FOR FOSV.C/O ELEVATORS. 04:30 - 05:30 1.00 DRILL P INT1 PJSM-MONITOR WELL THROUGHT DURATION OF R/D 7"CSG EQUIP.R/U NECESSARY XO'S FOR FOSV 4"DP.C/O ELEVATORS. 05:30 - 07:00 1.50 DRILL P INT1 PICK UP BAKER LINER HANGER,LINER TOP PACKER ASSEMBLY,ONE SINGLE JT DP&5' PUP JT.RIH WITH 4"DP FROM DRK F/7,141' TO 7,217'-MD. STAGE UP PUMP& WASH EACH 5 STANDS IN HOLE. -PUW 218K,SOW 156K -GPM 168,PSI 360 07:00 - 13:00 6.00 CASING P INT1 CONT.RIH W/4"DP.F/7,217'TO 9,442'-MD. STAGE PUMP UP IN 1/2 BBL INCREMENTS& AS PSI DECREASES WASH EACH 5 STANDS DP DN. -PUW 310K,SOW 140K -GPM 168, PSI 550. 13:00 - 16:00 3.00 CASING P INT1 WASH DN F/9,492'TO 9,587'-MD C&C MUD. CIRC&STAGE PUMP UP AS FOLLOWS. -1 BPM,370 PSI- 2 BPM,470 PSI- 3 BPM, 530 PSI- 4 BPM,600 PSI-5 BPM,680 PSI CIRCULATE B/U -210 GPM(5 BPM), PSI 680 8.5 BBL LOST DURING CIRCULATION 16:00 - 19:00 3.00 CASING P INT1 RIH TO 10,276'-MD&TAG BTM.M/U CEMENT HEAD.EST.CIRC STAGE UP PUMP. 1/2 BPM,260 PSI- 1 BPM,305 PSI- 1.5 BPM, 340 PSI- 2 BPM,380 PSI-2.5 BPM,410 PSI- 3 BPM,475 PSI-4 BPM,580 PSI- 5 BPM,680 PSI. C&C MUD AT 5 BPM,680 PSI. 19:00 - 19:30 0.50 CASING P -_ INT1 PJSM WITH ALL RIG PERSONNEL,SLB CEMENTERS&CH2 TRUCKS ON CEMENTING. Printed 8/9/2011 10:16:28AM )rth America -ALASKA- BP Page 39 of 58 Operation Summary Report Common Well Name: K-10 AFE No Event Type: RE-ENTER-ONSHORE(RON) Start Date:4/27/2011 End Date:7/4/2011 X3-00XC,1_C(4,684,455.00) Project: Prudhoe Bay Site: PB K Pad Rig Name/No.: DOYON 25 Spud Date/Time:4/24/2001 12:00:00AM Rig Release: Rig Contractor: DOYON DRILLING INC. UWI: 500292176200 Active Datum:K-10C @66.39ft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (ft) 19:30 - 21:30 2.00 CEMT P INT1 BATCH CMT, PUMP 5 BBL 12 PPG MUD PUSH, �a PT LINES TO 4,500 PSI C �\ -PUMP 29 BBL,12 PPG MUD PUSH AT 5 BPM, I 750 PSI. -PUMP 50 BBL 15.8 PPG CLASS G CEMENT AT 5 BPM,250 PSI -RELEASE PLUG VERIFY LEFT CMT HEAD. CHASE PLUG,FLUSH LINES W/5 BBL H2O F/ SLB. -DISPLACE AND BUMP PLUG W/RIG PUMP. PUMPING 10.2 PPG MUD-5 BPM,312 PSI ICP. WHEN 272 BBLS PUMPED SLOW TO 4 BPM, 990 PSI 288 BBLS AWAY SLOW TO 2 BPM,975 PSI. BUMP PLUG AT 298 BBL PUMPED,2902 STKS.98%CEMENT IN PLACE AT 21:25 HRS. NOTED ZERO FLUID LOSSES TO HOLE DURING CEMENTING. PRESSURE TO 1350 PSI, BLEED&CHECK FLOAT.FLOAT IS GOOD. -WITH A LIFT PRESSURE OF 975 PSI,THE ESTIMATED TOC ON THIS 7"LINER IS 9,106' MD(-1,170'CEMENT COLUMN FROM THE CURRENT WELL TD AT 10,276'MD). 21:30 - 23:00 1.50 CASING P INT1 PRESSURE TO 4,200 PSI SET LINER PACKER. SET LINER PACKER AT 3,107'MD. BLEED PSI TO ZERO.VERIFY PACKER IS SET. -PUW 82K,SOW 90K, BLOW DN TD&CMT LINES.LID CMT HEAD. 23:00 - 00:00 1.00 CASING P INT1 CBU 420 GPM,660 PSI.MONITOR WELL (STATIC) 6/13/2011 00:00 - 02:00 2.00 CASING P INT1 POOH W/DP&LINER RUNNING TOOL F/ 2,556'-MD.MONITOR WELL(STATIC) 02:00 - 02:30 0.50 CASING P INT1 L/D LINER RUNNING TOOL PER BOT REP. 02:30 - 03:00 0.50 BOPSUR P INT1 CLEAN&CLEAR FLOOR.PULL WEAR RING. INSTALL TEST PLUG. 03:00 - 03:30 0.50 BOPSUR P INT1 CHANGE UPPER RAMS F/7"TO 2-7/8"X 5-1/2" VBR'S. 03:30 - 04:00 0.50 BOPSUR P INT1 R/U BOPE TEST EQUIP.P/U TEST JT.FILL STACK W/H2O Printed 8/9/2011 10:16:28AM )rth America -ALASKA- BP Page 40 of 58 Operation Summary Report Common Well Name: K-10 AFE No Event Type: RE-ENTER-ONSHORE(RON) Start Date:4/27/2011 End Date:7/4/2011 X3-00XCJ-C(4,684,455.00) Project: Prudhoe Bay Site: PB K Pad Rig Name/No.: DOYON 25 Spud Date/Time:4/24/2001 12:00:00AM Rig Release: Rig Contractor: DOYON DRILLING INC. UWI:500292176200 Active Datum: K-10C @66.39ft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (ft) 04:00 - 07:30 3.50 BOPSUR P PROD1 WEEKLY TESTING OF BOPE. MATT HERRERA-AOGCC WAIVED WITNESS OF TEST. TEST BOPE PER AOGCC/BP P REQUIREMENTS. TESTED FOLLOWING COMPONENTS TO 250-PSI LO/3,500-PSI HI WITH 4"TEST JT: 13-5/8"ANNULAR PREVENTER, UPPER PIPE RAMS-2-7/8"X IZ6 5-1/2"VBR'S, BLIND/SHEAR RAMS,LOWER PIPE RAMS-2/78"X 5-1/2"VBR'S,15 CHOKE MANIFOLD VALVES,UPPER AND LOWER KELLY VALVES, IBOP(DART VALVE), 2-FOSV'S, MANUAL KILL LINE VALVE AND MANUAL CHOKE LINE VALVE, HCR KILL AND HCR CHOKE VALVES. TESTED UPPER AND LOWER VBR'S WITH 4"TEST JOINT.TEST MANUAL CHOKE VALVE&SUPER CHOKE 250-PSI LO/2,000-PSI HI. -PERFORMED ACCUMULATOR TEST: SYSTEM PRESSURE 3,000-PSI, PRESSURE AFTER CLOSING ALL RAMS AND ANNULAR PREVENTER-1,700-PSI. RECOVERED 1ST 200-PSI-43 SECONDS. FINAL PRESSURE OBTAINED-147 SECONDS. 6 NITROGEN BOTTLES,AVERAGE PRESSURE=2,450-PSI. PER API RP 53--FUNCTION AND RECORD RESPONSE TIME OF ACTIVATION AND FULL CLOSURE AS FOLLOWS: LOWER PIPE RAMS- 15 SECONDS, BLIND/SHEAR RAMS-17 SECONDS, UPPER PIPE RAMS-17 SECONDS AND ANNULAR-26 SECONDS. 07:30 - 08:00 0.50 BOPSUR P PROD1 R/D BOP TEST EQUIP. B/D ALL LINES.LOAD SHED W/BHA 08:00 - 09:30 1.50 CASING P INT1 WHILE LOADING SHED W/BHA. P/U CEMENT HEAD PREVIOUSLY USED ON 7"LINER. BREAK DOWN SAME&CLEAR FROM FLOOR 09:30 - 10:30 1.00 DRILL P PROD1 SERVICE TD, BLOCKS&TRAVELING EQUIP. 10:30 - 12:00 1.50 CASING P INT1 R/U&FILL LINES TO TEST 7"X 9-5/8"CSG. TEST CSG TO 250-PSI LO,5 MINUTES/ 3,500-PSI HI FOR 30 MINUTES EACH TEST CHARTED. 12:00 - 17:00 5.00 DRILL N RREP INT1 TROUBLESHOOT T-DRIVE.SHOOT PIN FOR TORQUE WRENCH GRABBER.OUT OF CRITICAL PATH MOBILIZE BHA TO FLR. CLEAN CUTTING TANK&WORK ON CUTTING TANK AUGER.C/O ODS TUGGER CABLE 17:00 - 18:00 1.00 DRILL P INT1 P/U 6-1/8 PROD.HOLE BHA.TRICONE BIT, 4-3/4 MTR. 18:00 - 19:00 1.00 DRILL P INT1 ADJUST TONG LINE PULL PARAMETERS FOR TONGS,ADJUST SETTINGS IN AMPHION FOR MORE SUFFICIENT TORQUE READING.HOLD AAR ON LINER RUNNNG JOB WHILE TONG ADJUSTMENTS ARE FINALIZED. 19:00 - 00:00 5.00 DRILL P INT1 CONTINUE TO M/U 6-1/8"BHA.SHALLOW TEST MWD/LWD TOOLS.SIGNAL GOOD. -GPM 225, PSI 1320 PJSM-LOAD NUKE SOURCE. RIH W/BHA TI 343'-MD 6/14/2011 00:00 - 01:00 1.00 DRILL P INT1 CONTINUE TO M/U 6-1/8"BHA#14. FROM 343' _ _TO 433'MD. 01:00 - 02:00 1.00 DRILL P INT1 PJSM.SERVICE RIG. Printed 8/9/2011 10:16:28AM )rth America -ALASKA- BP Page 41 of 58 Operation Summary Report Common Well Name: K-10 AFE No Event Type: RE-ENTER-ONSHORE(RON) Start Date:4/27/2011 End Date: 7/4/2011 X3-00XCJ-C(4,684,455.00) Project:Prudhoe Bay Site:PB K Pad Rig Name/No.:DOYON 25 Spud Date/Time:4/24/2001 12:00:00AM Rig Release: Rig Contractor: DOYON DRILLING INC. UWI:500292176200 Active Datum:K-10C @66.39ft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) ft) 02:00 - 03:00 1.00 DRILL N RREP _ INT1 REPAIR ENCODER CABLE ON IRON DERRICK MAN(IDM). 03:00 - 03:30 0.50 DRILL P -_ INT1 PJSM.CONTINUE TO RIH WITH BHA TO 499 FT MD.RIG DOWN HANDLING EQUIPMENT. 03:30 - 11:30 8.00 DRILL P -_ INT1 RIH PICKING UP DOUBLES TO 5142 FT MD. FILL PIPE EVERY 8TH DOUBLE. 11:30 - 18:00 6.50 DRILL P INT1 RIH FILLING EVERY 10 STANDS OUT OF DERRICK TO 10,092 FAT MD.PU WEIGHT 230K, DOWN WEIGHT 133K.ESTABLISH CIRCULATION AT 200 GPM WITH 1880 PSI. RIH AND TAG CEMENT AT 10189 FT MD. 18:00 - 20:00 2.00 DRILL P INT1 PJSM.LINE UP AND DISPLACE WELLBORE WITH 8.5 PPG QUIK-DRILN DRILLING FLUID. PUMP AT 260 GPM WITH 3070 PSI DROPPING TO 1860 PSI.RECIPROCATE AND ROTATE AT 40 RPM WITH 9K TORQUE.SHUT DOWN AND CHECK WELL-STATIC. 20:00 - 00:00 4.00 DRILL P INT1 PJSM.PERFORM NEGATIVE PRESSURE TFST ON LINER TOP FOR 30 MINUTES WHILE RIGGING UP TO SLIP AND CUT DRILLING LINE.TEST PASSED.TEST APPROVED BY WTL MIKEL SCHULTZ.CONTINUE TO RIG UP THEN SLIP AND CUT 64 FT OF DRILLING LINE. 6/15/2011 00:00 - 01:30 1.50 DRILL P INT1 PJSM. FINISH SLIP AND CUT DRILL LINE. 01:30 - 06:30 5.00 DRILL P INT1 PJSM.WASH DOWN TO WIPER DART DRII t - D_: u ► :k1 I IF W FORMATION TO 10.296 FT MD.PUMP kT 254 GPM WITH 1800 PSI ON BOTTOM,1730 PSI OFF BOTTOM.ROTATE AT 40 RPM WITH 11K TQ ON BOTTOM,10K TQ OFF BOTTOM.WOB 5-7K.UP WEIGHT 218K,DOWN 136K,RT 160K. MUD WEIGHT IN AND OUT 8.7 PPG. 06:30 - 07:30 1.00 DRILL P INT1 CIRCULATE AND CONDITION FOR FIT.PUMP AT 253 GPM WITH 1860 PSI.RECIPROCATE AND ROTATE AT 40 RPM WITH 10-12K TQ. MUD WEIGHT IN AND OUT 8.7 PPG. 07:30 - 09:00 1.50 DRILL P INT1 PJSM.LINE UP AND PERFORM FIT TO 9.8 ,� (� PPG EMW WITH 470 PSI AT 8,198 FT ND �' WITH 8.7 PPG DRILLING FLUID.BLOW DOWN AND RIG DOWN TEST EQUIPMENT. 09:00 - 12:00 3.00 DRILL P PROD1 DIRECTIONAL DRILL AHEAD TO 10,395 FT MD. PUMP AT 275 GPM WITH 2240 PSI. ROTATE AT 40 RPM WITH 9-11K TQ.WOB 7-11K.MUD WEIGHT IN AND OUT 8.7 PPG. 12:00 - 00:00 12.00 DRILL P PROD1 PJSM.DIRECTIONAL DRILL AHEAD TO 10,687 FT MD,8,503 FT ND.PUMP AT 275 GPM WITH 2350 PSI ON BOTTOM 2200 PSI OFF BOTTOM.ROTATE AT 25 RPM WITH 11K TQ ON BOTTOM,9K OFF BOTTOM.WOB 5-15K. MUD WEIGHT IN AND OUT 8.7 PPG.PU WEIGHT250K,DOWN 130K, RT 157K.AST- 3.37,ART-2.5,ADT-5.87. 6/16/2011 00:00 - 12:00 12.00 DRILL P PROD1 PJSM.DIRECTIONAL DRILL AHEAD TO 10,830 FT MD,8,598 FT ND.PUMP AT 275 GPM WITH 2270 PSI ON BOTTOM,2200 PSI OFF BOTTOM.ROTATE AT 50 RPM WITH 11-12K TQ ON BOTTOM,9-11K TQ OFF BOTTOM. WOB 5-20K.MUD WEIGHT IN AND OUT 8.7 PPG. PU WEIGHT 260K,DOWN 138K,RT 172K. Printed 8/9/2011 10:16:28AM -)rth America -ALASKA - BP Page 42 of 58 Operation Summary Report Common Well Name:K-10 AFE No Event Type: RE-ENTER-ONSHORE(RON) Start Date:4/27/2011 End Date:7/4/2011 X3-00XCJ-C(4,684,455.00) Project:Prudhoe Bay Site:PB K Pad Rig Name/No.: DOYON 25 Spud Date/Time:4/24/2001 12:00:00AM Rig Release: Rig Contractor: DOYON DRILLING INC. UWI:500292176200 Active Datum:K-10C @66.39ft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (ft) 12:00 - 13:30 1.50 DRILL P PROD1 PJSM.DIRECTIONAL DRILL AHEAD TO 11,017 FT MD,8,599 FT ND.PUMP AT 275 GPM WITH 2240 PSI ON BOTTOM,2155 PSI OFF BOTTOM.ROTATE AT 50 RPM WITH 12K TQ ON BOTTOM,9-11K TQ OFF BOTTOM.WOB 5-20K.MUD WEIGHT IN AND OUT 8.7 PPG.PU WEIGHT 260K,DOWN 138K, RT 172K. DECISION MADE TO PULL BIT DUE TO POOR ROP. 13:30 - 14:00 0.50 DRILL P PROD1 PJSM TAKE SLOW PUMP RATES.MONITOR WELL-STATIC.MUD WEIGHT IN AND OUT 8.7 PPG. 14:00 - 17:00 3.00 DRILL P PROD1 PJSM. PUMP OUT OF HOLE TO 10,262 FT MD AT 150 GPM WITH 1000 PSI. UP WEIGHT 215K, DOWN 143K.' • 17:00 - 17:30 0.50 DRILL P PROD1 MONITOR WELL.PUMP DRY JOB. 17:30 - 00:00 6.50 DRILL P PROD1 POOH ON ELEVATORS TO 850 FT MD.AST- 3.51,ART-5.08,ADT-8.59. MUD WEIGHT IN AND OUT 8.7 PPG. 6/17/2011 00:00 - 01:00 1.00 DRILL P PROD1 PJSM.POOH TO BHA AT 499 FT MD. MONITOR WELL-STATIC. 01:00 - 02:30 1.50 DRILL P PROD1 POOH WITH BHA TO SOURCES.REMOVE SOURCES. 02:30 - 03:30 1.00 DRILL P PROD1 DOWNLOAD MWD. 03:30 - 04:30 1.00 DRILL P PROD1 PJSM.CONTINUE TO POOH WITH BHA. BREAK OUT BIT. 04:30 - 08:00 3.50 DRILL P PROD1 MAKE UP NEW BIT.RIH WITH 6 1/8 IN PILOT HOLE BHA#2.AT 50 FT MD UPLOAD MWD AND SHALLOw PULSE TEST.INSTALL SOURCES AND RUN IN TO499 FT MD.UP AND DOWN WEIGHT 60K.MONITOR WELL- STATIC. 08:00 - 12:00 4.00 DRILL P PROD1 PJSM.RIH TO 4289 FT MD. 12:00 - 20:00 8.00 DRILL P PROD1 PJSM. RIH TO 10762 FT MD. UP WEIGHT 212K, DOWN 127K.MUD WEIGHT IN AND OUT 8.8 PPG. 20:00 - 21:00 1.00 DRILL P PROD1 PERFORM ROTATIONAL CHECKSHOT LOG AT 10717 FT MD. 21:00 - 21:30 0.50 DRILL P PROD1 RIH TO 10858 FT MD. 21:30 - 22:15 0.75 DRILL P PROD1 PERFORM ROTATIONAL CHECKSHOT LOG AT 10813 FT MD. 22:15 - 22:30 0.25 DRILL P PROD1 RIH TO 10953 FT MD. 22:30 - 23:00 0.50 DRILL P PROD1 PERFORM ROTATIONAL CHECKSHOT LOG AT 10908 FT MD. 23:00 - 00:00 1.00 DRILL P PROD1 WASH AND REAM TO BOTTOM AT 275 GPM WITH 2250 PSI.ROTATE AT 40 RPM WITH 8-11K TQ.WOB 2-4K.MUD WEIGHT IN AND OUT 8.75 PPG.UP WEIGHT 225K,DOWN 140K, RT 165K. Printed 8/9/2011 10:16:28AM )rth America-ALASKA- BP Page 43 of 58 Operation Summary Report Common Well Name:K-10 AFE No Event Type: RE-ENTER-ONSHORE(RON) Start Date:4/27/2011 End Date:7/4/2011 X3-00XCJ-C(4,684,455.00) Project: Prudhoe Bay Site: PB K Pad Rig Name/No.: DOYON 25 Spud Date/Time:4/24/2001 12:00:00AM Rig Release: Rig Contractor: DOYON DRILLING INC. UWI:500292176200 Active Datum: K-10C©66.39ft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (ft) _ 6/18/2011 00:00 - 12:00 12.00 DRILL P PROD1 PJSM. DIRECTIONAL DRILL AHEAD TO 11,424 FT MD,8,700 FT TVD. PUMP AT 275 GPM WITH 2270 PSI ON BOTTOM,2200 PSI OFF BOTTOM.ROTATE AT 50 RPM WITH 11-12K TQ ON BOTTOM,7-11K TQ OFF BOTTOM. WOB 5-15K.MUD WEIGHT IN AND OUT 8.75 PPG. PU WEIGHT 232K, DOWN 140K, RT 168K. -STARTED LOOSING FLUID AT 11355 FT MD. INITIAL LOSSES AT 90 BPH SLOWING TO 50-60 BPH WHILE DRILLING AHEAD. 12:00 - 15:00 3.00 DRILL P PROD1 PJSM.DIRECTIONAL DRILL AHEAD TO 11,490 FT MD,8,700 FT TVD. PUMP AT 275 GPM WITH 2270 PSI ON BOTTOM,2200 PSI OFF BOTTOM.ROTATE AT 50 RPM WITH 11-12K TQ ON BOTTOM,7-11K TQ OFF BOTTOM. WOB 5-15K.MUD WEIGHT IN AND OUT 8.75 PPG. PU WEIGHT 232K, DOWN 140K, RT 168K. LOSSES AT 40-50 BPH WHILE DRILLING AHEAD. 15:00 - 15:30 0.50 DRILL P PROD1 PERFORM STATIC LOSS TEST-10 BPH. 15:30 - 00:00 8.50 DRILL P PROD1 DIRECTIONAL DRILL AHEAD TO 11,617 FT MD, 8,779 FT TVD.PUMP AT 275 GPM WITH 2350 PSI ON BOTTOM,2200 PSI OFF BOTTOM. ROTATE AT 50 RPM WITH 11-12K TQ ON BOTTOM,7-11K TQ OFF BOTTOM.WOB 5-25K. MUD WEIGHT IN AND OUT 8.75 PPG.PU • WEIGHT 240K, DOWN 147K, RT 178K. LOOSING 45-55 BPH.ADDING BARACARB AND BAROFIBRE FOR LCM.AST-5.55,ART- 9.47,ADT-15.02. 6/19/2011 00:00 - 04:30 4.50 DRILL P PROD1 PJSM. DIRECTIONAL DRILL AHEAD TO 11,677 FT MD,8,815 FT TVD.CALL TD OF PILOT /JAL% HOLE 11,677 FT MD WITH TOP OF KAVIK AT i 11,551 FT MD. PUMP AT 275 GPM WITH 2280 1_ PSI ON BOTTOM,2175 PSI OFF BOTTOM. ROTATE AT 50 RPM WITH 8-11K TQ ON BOTTOM,7-10K TQ OFF BOTTOM.WOB 5-25K. MUD WEIGHT IN AND OUT 8.7 PPG.PU (9,, WEIGHT 240K, DOWN 147K, RT 178K. LOSSES AT 75 BPH WHILE DRILLING AHEAD. 04:30 - 05:30 1.00 DRILL P PROD1 PUMP UP SURVEYS ON BOTTOM AND CONNECTIONS ON LAST STAND. 05:30 - 07:00 1.50 DRILL P PROD1 PULL UP ABOVE KAVIK TO 11,550 FT MD. CIRCULATE BOTTOMS UP.SHUT DOWN MONITOR WELL-WELL TAKING FLUID AT 35 BPH. 07:00 - 09:30 2.50 DRILL P PROD1 PJSM.MUD WEIGHT IN AND OUT 8.7 PPG. _ POOH ON ELEVATORS TO 10,262 FT MD. 09:30 11:30 2.00 DRILL P PROD1 PJSM. UP WEIGHT 200K, DOWN 150K. ESTABLISH CIRCULATION AT 84 GPM WITH 585 PSI.SHUT DOWN, BREAK CONNECTION AND DROP WELL COMMANDER OPENING BALL. PUMP DOWN AND SEAT BALL, PRESSURE UP TO 1500 PSI, HOLD PRESSURE,STAGE UP TO 2000 PSI THEN 2500 PSI AND OBSERVE PRESSURE LOSS TO VERIFY SUB OPENING.CIRCULATE AT 84 GPM WITH 390 PSI-SUB OPEN.PUMP 30 BBL,50 PPB LCM PILL.DISPLACE PILL AT 200 GPM WITH 550 PSI. Printed 8/9/2011 10:16:28AM rth America-ALASKA BP Page 44 of 58 Operation Summary Report Common Well Name: K-10 AFE No Event Type: RE-ENTER-ONSHORE(RON) Start Date:4/27/2011 End Date:7/4/2011 X3-00XCJ-C(4,684,455.00) Project:Prudhoe Bay Site: PB K Pad Rig Name/No.:DOYON 25 Spud Date/Time:4/24/2001 12:00:00AM Rig Release: Rig Contractor:DOYON DRILLING INC. UWI:500292176200 Active Datum:K-10C @66.39ft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (ft) 11:30 - 12:00 0.50 DRILL P PROD1 PJSM.MONITOR WELL.MUD WEIGHT IN AND OUT 8.7 PPG. POOH ON ELEVATORS TO 9,598 FT MD.STATIC LOSSES AT 20 BPH. 12:00 - 12:30 0.50 DRILL P PROD1 PJSM. DROP WELL COMMANDER CLOSING BALL AND PUMP DOWN AT 84 GPM WITH 100 PSI.COULD NOT GET BALL TO SEAT. RECIPROCATE AND ROTATE PIPE.WELL COMMANDER PRESSURED UP ANC CYCLED CLOSED WITH 2000 PSI. 12:30 - 16:00 3.50 DRILL P PROD1 MONITOR WELL. LOOSING 20 BPH STATIC. MUD WEIGHT IN AND OUT 8.7 PPG.PULL 2 STANDS WITH NO OBSERVED SWABBING. PUMP DRY JOB. POOH TO 7,702 FT MD. 16:00 - 16:30 0.50 DRILL P PROD1 HOLD UNANNOUNCED KICK WHILE TRIPPING DRILL WITH FIELD SUPERINTENDENT ALAN MADSEN AND RIG LEADERSHIP TEAM. DRILL TIME 1 MINUTE 20 SECONDS.HOLD MR AND CAPTURE LESSONS LEARNED AND ACTION ITEMS. 16:30 - 21:00 4.50 DRILL P PROD1 MUD WEIGHT IN AND OUT 8.7 PPG.POOH TO BHA AT 499 FT MD.MONITOR WELL,STILL LOOSING 20 BPH. 21:00 - 00:00 3.00 DRILL P PROD1 PJSM. POOH AND LAY DOWN BHA.STAND BACK DRILL COLLARS AND JARS.LAY DOWN WELL COMMANDER.REMOVE NUKES AND LAY DOWN MWD. BREAK OUT AND LAY DOWN BIT. 6/20/2011 00:00 - 00:30 0.50 DRILL P PROD1 PJSM.FINISH BREAKING OUT BIT AND LAYING DOWN BHA. 00:30 - 01:30 1.00 DRILL P PROD1 PJSM. PERFORM KICK WHILE TRIPPING DRILL. EVALUATE VOLUME REQUIRED TO FILL LINES AND VESSELS. HOLD AAR, CAPTURE LESSONS LEARNED AND ACTION ITEMS. 01:30 - 02:30 1.00 DRILL P PROD1 PJSM. RIG UP TO TEST BOPE. RIG UP TO CIRCULATE OVER THE TOP OF THE ANNULUS.WELL TAKING 30 BPH. 02:30 - 07:00 4.50 DRILL P PROD1 PJSM.TEST BOPE TO 250 PSI LOW,3500 PSI HIGH AS PER AOGCC AND BP POLICY. TEST ve ANNULAR TO 250 PSI LOW,3500 PSI HIGH. 1/ CHART EACH TEST FOR 5 MINUTES.TEST WITNESS WAIVED BY BOB NOBLE WITH f(A7 AOGCC.TEST WITNESSED BY WSL MITCH SKINNER AND TOOLPUSHER JOHNNY NEWMAN.TEST PIPE RAMS WITH 4 IN AND 4 1/2 IN TEST JOINTS.TEST ANNULAR PREVENTER WITH 4 IN TEST JOINT.CLOSING TIME FOR ANNULAR PREVENTER 20 SEC., FOR UPPER RAMS 18 SEC., LOWER RAMS 17 SEC.,CHOKE AND KILL HCR 2 SEC.EACH. RIG DOWN TEST EQUIPMENT. 07:00 - 07:30 0.50 DRILL P PROD1 PJSM. RUN IN AND SET WEAR BUSHING.RIG DOWN HOLE FILL FOR IA. 07:30 - 12:30 5.00 DRILL P PROD1 PJSM.RIG UP HANDLING EQUIPMENT. LOSSES AT 30 BPH. PU/MU BHA#10 TO 110 FT MD. UPLOAD MWD,SHALLOW TEST- GOOD. PJSM.LOAD SOURCES.CONTINUE TO RIH TO 498 FT MD. Printed 8/9/2011 10:16:28AM firth America-ALASKA BP Page 45 of 58 Operation Summary Report Common Well Name: K-10 AFE No Event Type: RE-ENTER-ONSHORE(RON) Start Date:4/27/2011 End Date:7/4/2011 X3-00XCJ-C(4,684,455.00) Project:Prudhoe Bay Site: PB K Pad Rig Name/No.: DOYON 25 Spud Date/Time:4/24/2001 12:00:00AM Rig Release: Rig Contractor: DOYON DRILLING INC. UWI:500292176200 Active Datum:K-10C @66.39ft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (ft) 12:30 - 22:30 10.00 DRILL P PROD1 RIH WITH 4 IN DRILL PIPE TO TOP OF 7 IN SHOE AT 10,262 FT MD.FILL EVERY 20 STANDS.UP WEIGHT 184K, DOWN 150K. 22:30 - 23:00 0.50 DRILL P PROD1 PJSM.SERVICE TOP DRIVE. 23:00 - 23:30 0.50 DRILL P PROD1 RIH TO 10,731 FT MD, 8,524 FT TVD. 23:30 - 00:00 0.50 DRILL P PROD1 SHOOT ROTATIONAL SURVEYS AT 10,731 FT MD AT 247 GPM WITH 1667 PSI. 6/21/2011 00:00 - 02:30 2.50 DRILL P PROD1 PJSM. RIH TO 11400 FT MD AND SHOOT ROTATIONAL SURVEYS AT 10,826 FT MD AND 10,920 FT MD 02:30 - 04:00 1.50 DRILL P PROD1 BUILD RAMP AT 11,400 FT MD TO 11,420 FT MD. PUMP AT 250 GPM WITH 1820 PSI. 04:00 - 12:00 8.00 DRILL P PROD1 TIME DRILL FROM 11,420 FT MD TO 11,428 FT MD AT 130 DEGREES LEFT. PUMP AT 250 �� GPM WITH 1750 PSI OFF BOTTOM,1890 PSI ON BOTTOM.WOB 1K. UP WEIGHT 205K, €711 DOWN 150K.LOSSES AT 60 BPH. 12:00 - 20:30 8.50 DRILL P PROD1 CONTINUE TO DIRECTIONAL DRILL OPEN ott HOLE SIDETRACK AT 130 DEGREES LEFT FROM 11,428 FT MD TO 11,440 FT MD. 20:30 - 00:00 3.50 DRILL P PROD1 ATTEMPT TO VERIFY NEW WELLBORE.PULL UP 10 FT,SLACK OFF.TAKING WEIGHT CONFIRMING SIDETRACK.PULL UP KICK IN PUMP. PRESSURE UP TO 2200 PSI FROM 1900 PSI.WORK DOWN TO CONTINUE SIDETRACK BUT UNABLE TO GET INTO NEW WELLBORE.SLACKED OFF TO 11,443 MD WITH NO WOB OR DIFFERENTIAL PRESSURE. BIT NOT TAKING WEIGHT. SENIOR DD CALLED OUT TO ASSIST. SEVERAL ATTEMPTS MADE TO FIND NEW WELLBORE WITH NO SUCCESS.PUMP AT 225 TO 250 GPM WITH 1750 TO 1850 PSI.PU WEIGHT 210K, DOWN 150K.AST-10.84. 6/22/2011 00:00 - 02:00 2.00 DRILL P PROD1 PJSM.MAKE SEVERAL MORE ATTEMPTS TO FIND NEW WELLBORE WITH NO SUCCESS. PUMP AT 225 TO 250 GPM WITH 1750 TO 1850 PSI. PU WEIGHT 210K, DOWN 150K.HOLD CONSULTATION WITH DD'S,GEOLOGIST AND ODE JOHN ROSE.DECISION MADE TO ABANDON ATTEMPT TO SIDETRACK AT 11,420 FT MD THEN MOVE BELOW SHALE STRINGER AT 11,440 FT MD AND SIDETRACK FROM THERE. 02:00 - 06:00 4.00 DRILL N DPRB 11,420.00 PROD1 WORK TROUGH FROM 11,440 FT MD TO 11,445 FT MD.TIME DRILL FROM 11,445 FT MD TO OPEN HOLE SIDETRACK PRODUCTION HOLE. PUMP AT 225 GPM WITH 1500 PSI.WOB 3.5K.LOSSES HOLDING AT 65-75 BPH. 06:00 - 12:00 6.00 DRILL N DPRB 11,420.00 PROD1 CONTINUE TO TIME DRILL FOR OPEN HOLE SIDETRACK TO 11,455 FT MD.PUMP AT 225 GPM WITH 1500 PSI.WOB.5-4K. UP WEIGHT 205K, DOWN 145K. LOSSES AT 60 BPH. Printed 8/9/2011 10:16:28AM rth America -ALASKA- BP Page 46 of 58 Operation Summary Report Common Well Name:K-10 AFE No Event Type: RE-ENTER-ONSHORE(RON) Start Date:4/27/2011 End Date:7/4/2011 X3-00XCJ-C(4,684,455.00) Project: Prudhoe Bay Site: PB K Pad Rig Name/No.: DOYON 25 Spud Date/Time:4/24/2001 12:00:00AM Rig Release: Rig Contractor:DOYON DRILLING INC. UWI:500292176200 Active Datum: K-10C @66.39ft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (ft) 12:00 - 00:00 12.00 DRILL N DPRB 11,420.00 PROD1 PJSM.CONTINUE DIRECTIONAL DRILL OPEN HOLE SIDETRACK TO 11,471 FT MD,8,715 FT TVD.PUMP AT 225 GPM WITH 1500 PSI ON BOTTOM,1475 PSI OFF BOTTOM.WOB 1-8K. UP WEIGHT 205K, DOWN 150K.MUD WEIGHT IN AND OUT 8.65 PPG.AST-19.47. LOSSES AT 60-75 BPH. 6/23/2011 00:00 - 09:00 9.00 DRILL N DPRB 11,420.00 PROD1 PJSM.CONTINUE TO DIRECTIONAL DRILL OPEN HOLE SIDETRACK TO 11,500 FT MD, 8,722 FT TVD.PUMP AT 225 GPM WITH 1500 PSI ON BOTTOM,1475 PSI OFF BOTTOM. WOB 1-8K. UP WEIGHT 205K, DOWN 150K. MUD WEIGHT IN AND OUT 8.65 PPG.LOSSES AT 60-75 BPH.AST-8.40 LOOSING DIFFERENTIAL AND WEIGHT ON BIT.SLACK OFF WITH PUMPS DOWN WITHOUT TAKING WEIGHT. UNABLE TO GET KICKED OFF IN OPEN HOLE SIDETRACK. 09:00 - 12:00 3.00 LCR N DPRB 11,420.00 PROD1 MONITOR WELL.MUD WEIGHT IN AND OUT 8.65 PPG. PUMP OUT OF HOLE TO 10,262 FT MD AT 84 GPM WITH 450 PSI. 12:00 - 14:30 2.50 LCR N DPRB 11,420.00 PROD1 PJSM. PICK UP SHEARABLE JOINT AND SPACE OUT TO 10,284 FT MD FOR PUMPING EZ SQUEEZE LCM PILL.DROP WELL COMMANDER OPENING BALL AND PUMP ON SEAT.OPEN WELL COMMANDER WITH 2400 PSI.CHECK MWD WITH NO PULSE.DROP BHA SHUT OFF BALL. PUMP ON SEAT THEN STAGE PUMPS UP TO 720 PSI AND SHUT OFF BHA.PRESSURE DROPPED TO 335 PSI AND STILL NO MWD PULSE. 14:30 - 16:00 1.50 LCR N DPRB 11,420.00 PROD1 PJSM. RIG UP CEMENT LINE AND CHART RECORDER FOR EZ SQUEEZE PILL. BREAK CIRCULATION AT 126 GPM WITH 380 PSI. SHUT DOWN,PRESSURE TEST LINES TO 3500 PSI.CONTINUE TO CIRCULATE WHILE MIXING LCM PILL. HOLD PJSM FOR EZ SQUEEZE PILL. 16:00 - 18:00 2.00 LCR N DPRB 11,420.00 PROD1 PUMP 60 BBL EZ SQUEEZE LCM PILL AT 50 PPB. PUMP AT 100 GPM WITH 335 PSI.AFTER PUMPING 10 BBLS SHUT DOWN DUE TO PROBLEMS PUMPING PILL.CLEAN PUMP AND RESUME PUMPING. PUMP AT 190 GPM WITH 350 TO 450 PSI. PUMP REMAINING 50 BBLS EZ SQUEEZE LCM PILL.CHASE PILL TO THE CIRC SUB WITH 52 BBLS MUD AT 190 GPM WITH 500 PSI. 18:00 - 18:30 0.50 LCR N DPRB 11,420.00 PROD1 SHUT ANNULAR PREVENTER.BULLHEAD 60 BBLS OF DRILLING FLUID SQUEEZING 40 BBLS FLUID AND 20 BBLS OF EZ SQUEEZE LCM PILL INTO THE FORMATION LEAVING 40 BBLS OF LCM PILL IN OPEN HOLE. PRESSURE AT END OF PUMPING 880 PSI. 18:30 - 19:30 1.00 LCR N DPRB 11,420.00 PROD1 LET PRESSURE BLEED OFF INTO FORMATION.PRESSURE 250 PSI AFTER 5 MINUTES,182 PSI AFTER 10 MINUTES,THEN 20 PSI AFTER 41 MINUTES THEN REMAINING STEADY AFTER 10 MORE MINUTES.OPEN UP KILL LINE WITH NO BLEED BACK OR PRESSURE RELEASE.OPEN UP ANNULAR AND MONITOR WELL. FLUID DROPPING. Printed 8/9/2011 10:16:28AM rth America -ALASKA- BP Page 47 of 58 Operation Summary Report Common Well Name:K-10 AFE No Event Type: RE-ENTER-ONSHORE(RON) Start Date:4/27/2011 End Date: 7/4/2011 X3-00XCJ-C(4,684,455.00) Project: Prudhoe Bay Site: PB K Pad Rig Name/No.: DOYON 25 Spud Date/Time:4/24/2001 12:00:00AM Rig Release: Rig Contractor:DOYON DRILLING INC. UWI:500292176200 Active Datum:K-10C @66.39ft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (ft) 19:30 - 21:30 2.00 LCR N DPRB 11,420.00 PROD1 MONITOR WELL WHILE PUMPING OVER THE TOP FOR 2 HOURS.FLUID LOSS AT 2 1/2 BPH. 21:30 - 00:00 2.50 LCR N DPRB 11,420.00 PROD1 PJSM. PERFORM HESITATION SQUEEZE IN 7 STAGES WITH A TOTAL OF 35 BBLS SQUEEZED TO FORMATION.PUMP AT 1 BPM UNTIL 5 BBLS PUMPED OR 700 PSI OBTAINED. #1 -PUMP 5 BBLS 1 BBLS 218 PS105 MIN 133 PSI30 MIN 27 PSI 2 BBLS 294 PSI1 0 MIN 90 PSI 3 BBLS 388 PSI15 MIN 65 PSI 4 BBLS 426 PSI20 MIN 46 PSI 5 BBLS 477 PS125 MIN 33 PSI #2-PUMP 5 BBLS 1 BBLS 285 PS105 MIN 152 PSI30 MIN 27 PSI 2 BBLS 390 PSI10 MIN 73 PSI 3 BBLS 479 PSI15 MIN 57 PSI 4 BBLS 519 PSI20 MIN 44 PSI 5 BBLS 541 PS125 MIN 35 PSI #3-PUMP 5 BBLS 1 BBLS 282 PS105 MIN 173 PSI30 MIN 23 PSI V� 2 BBLS 377 PSI10 MIN 83 PSI 3 BBLS 449 PSI15 MIN 52 PSI & 4 BBLS 509 PSI20 MIN 38 PSI 5 BBLS 550 PSI25 MIN 29 PSI #4-PUMP 5 BBLS 1 BBLS 307 PS105 MIN 198 PSI30 MIN 22 PSI 2 BBLS 396 PSI10 MIN 95 PSI 3 BBLS 490 PSI15 MIN 63 PSI 4 BBLS 537 PSI20 MIN 38 PSI 5 BBLS 562 PSI25 MIN 24 PSI #5-PUMP 5 BBLS 1 BBLS 263 PS105 MIN 172 PSI30 MIN 20 PSI 2 BBLS 348 PSI1 0 MIN 75 PSI 3 BBLS 430 PSI15 MIN 35 PSI 4 BBLS 449 PSI20 MIN 22 PSI 5 BBLS 544PSI25 MIN 20 PSI 6/24/2011 00:00 - 02:00 2.00 LCR N DPRB 11,420.00 PROD1 PJSM. PERFORM HESITATION SQUEEZE IN 7 STAGES WITH A TOTAL OF 35 BBLS SQUEEZED TO FORMATION.PUMP AT 1 BPM UNTIL 5 BBLS PUMPED OR 700 PSI OBTAINED. #6-PUMP 5 BBLS 1 BBLS 249 PS105 MIN 148 PSI30 MIN 20 PSI 2 BBLS 328 PSI10 MIN 60 PSI 3 BBLS 390 PSI15 MIN 28 PSI 4 BBLS 470 PSI20 MIN 20 PSI 5 BBLS 521 PS125 MIN 20 PSI #7-PUMP 5 BBLS 1 BBLS 250 PS105 MIN 145 PSI30 MIN 20 PSI 2 BBLS 334 PSI10 MIN 57 PSI 3 BBLS 410 PSI15 MIN 20 PSI 4 BBLS 460 PSI20 MIN 20 PSI 5 BBLS 524 PS125 MIN 20 PSI TOTAL BBLS PUMPED DURING SQUEEZE 35 BBLS. 02:00 - 02:30 0.50 LCR N DPRB 11,420.00 PROD1 PJSM.STAGE PUMPS UP TO 400 GPM WITH 1080 PSI.SHUT DOWN FOR DRILL. 02:30 - 03:00 0.50 LCR N DPRB 11,420.00 PROD1 HOLD FIRE DRILL IN CASING SHED. PERFORM HUDDLE UP AAR. Printed 8/9/2011 10:16:28AM rth America -ALASKA- BP Page 48 of 58 Operation Summary Report Common Well Name: K-10 AFE No Event Type: RE-ENTER-ONSHORE(RON) Start Date:4/27/2011 End Date: 7/4/2011 X3-00XCJ-C(4,684,455.00) Project:Prudhoe Bay Site: PB K Pad Rig Name/No.:DOYON 25 Spud Date/Time:4/24/2001 12:00:00AM Rig Release: Rig Contractor: DOYON DRILLING INC. UWI:500292176200 Active Datum: K-10C @66.39ft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (ft) 03:00 - 04:00 1.00 LCR N DPRB 11,420.00 PROD1 STAGE PUMPS UP TO 400 GPM WITH 1080 PSI.CIRCULATE 1 1/2 TIMES BOTTOMS UP. SHUT DOWN MONITOR WELL.LOSSES STATIC.MUD WEIGHT IN AND OUT 8.65 PPG. 04:00 - 06:30 2.50 DRILL N DPRB 11,420.00 PROD1 PJSM. POOH ON ELEVATORS FROM 10,284 FT MD TO 7,892 FT MD.NO SWABBING. PUMP DRY JOB AND CONTINUE TO POOH TO 7,418 FT MD.UP WEIGHT 148K, DOWN 135K.MUD WEIGHT IN AND OUT 8.65 PPG. 06:30 - 07:00 0.50 DRILL N DPRB 11,420.00 PROD1 PJSM.SERVICE TOP DRIVE, BLOCKS AND CROWN. 07:00 - 11:00 4.00 DRILL N DPRB 11,420.00 PROD1 PJSM. DECISION MADE TO RIH AND ATTEMPT OPEN HOLE SIDETRACK AT 10,810 FT MD. RIH TO 10,262 FT MD ABOVE 7 IN SHOE. DROP CLOSING BALL FOR CIRC SUB. INSPECT SAVER SUB WHILE WAITING ON BALL TO DROP ON SEAT. RUN BIT TO 10,284 FT MD OUTSIDE OF 7 IN SHOE. PUMP BALL ON SEAT AND SHIFT CLOSED AT 2000 PSI. PUMP UP TOOL FACE AT 275 GPM WITH 2250 PSI TO VERIFY OPERATION. 11:00 - 12:00 1.00 DRILL N DPRB 11,420.00 PROD1 RIH TO 10,800 FT MD,8,555 TVD. 12:00 - 00:00 12.00 DRILL N DPRB 11,420.00 PROD1 PJSM.TAKE SPR'S. LINE UP TO 180 DEGREES FOR TIME DRILLING.UP WEIGHT 180K, DOWN 151K, RT 168K.TIME DRILL OPEN HOLE SIDETRACK TO 10,815 FT MD, 8,556 FT TVD. PUMP AT 275 GPM WITH 2075 PSI ON BOTTOM,2060 OFF BOTTOM.WOB .6K.MUD WEIGHT IN AND OUT 8.6 PPG. LOSSES AT 21 BPH.AST-10.33. 6/25/2011 00:00 - 12:00 12.00 DRILL N DPRB 11,420.00 PROD1 PJSM.TIME DRILL FOR 6 1/8 IN OPEN HOLE SIDETRACK TO 10,835 FT MD,8,562 FT MD. PUMP AT 275 GPM WITH 2115 PSI ON BOTTOM,2050 PSI OFF BOTTOM.WOB 4K. MUD WEIGHT IN AND OUT 8.6 PPG.LOSSES AT 25 BPH. UP WEIGHT 191K, DOWN 151K, RT 169K. 12:00 - 15:00 3.00 DRILL N DPRB 11,420.00 PROD1 PJSM.CONTINUE TO TIME DRILL AND SLIDE TO SIDETRACK IN OPEN HOLE TO 10,850 FT MD. PICK UP OFF BOTTOM SHUT DOWN PUMPS AND SLACK OFF WITH 5K DOWN. PUMP UP SURVEYS SHOWING 7.5-8 DEGREES SEPARATION FROM OLD WELLBORE.SIDETRACK CONFIRMED. 15:00 - 20:30 5.50 DRILL N DPRB 11,420.00 PROD1 DIRECTIONAL DRILL AHEAD IN NEW 6 1/8 IN PRODUCTION INTERVAL.PUMPING AT 275 GPM WITH 2200 PSI.ROTATE AT 80 RPM WITH 8K TORQUE ON BOTTOM,7K TORQUE OFF BOTTOM.WOB 5-15K.MUD WEIGHT IN AND OUT 8.6 PPG. LOOSING 30 BPH. Printed 8/9/2011 10:16:28AM rth America -ALASKA- BP Page 49 of 58 Operation Summary Report Common Well Name:K-10 AFE No Event Type: RE-ENTER-ONSHORE(RON) Start Date:4/27/2011 End Date:7/4/2011 X3-00XCJ-C(4,684,455.00) Project: Prudhoe Bay Site: PB K Pad Rig Name/No.: DOYON 25 Spud Date/Time:4/24/2001 12:00:00AM Rig Release: Rig Contractor: DOYON DRILLING INC. UWI:500292176200 Active Datum:K-10C @66.39ft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (ft) 20:30 - 22:30 2.00 DRILL N DPRB 11,420.00 PROD1 I: : 101 .1 :u ►• .. IN PITS.SHUT DOWN AND DO FLOW CHECK. NORMAL CONNECTION FLOW DIMINISHING TO TRICKLE. NO FLOW INCREASE NOTED OR RECORDED.SOME AIR OR GAS NOTED IN MUD AT SURFACE BUT NO LEL DETECTED. MUD AIRED UP COMING OUT TO 8.2 PPG BUT BREAKING OUT IN SYSTEM. DECISION MADE TO DRILL DOWN LAST 20 FT OF STAND. RESET STROKE COUNTER FOR BOTTOMS UP AND CONTINUE TO DRILL LAST 20 FT.AFTER STAND WAS DRILLED DOWN CONTINUE TO WORK PIPE AND FINISH BOTTOMS UP. WHILE CIRCULATING PUMP PRESSURE STARTED TO DROP. NO INCREASE IN PUMP RATE OR FLOW.CHECK MUD WEIGHTS WITH MUD AND PRESSURE BALANCE SHOWING AIRED UP MUD IN SYSTEM.CHECK PUMPS AND CHARGE PUMPS.PUMPS STARVING. BEGIN ADDING DE-FOAM AND CHECKING SUCTIONS.SUCTIONS ON PUMPS WERE PLUGGED.CLEAN SUCTIONS CONTINUE TO TREAT SYSTEM.NO ABNORMAL RETURNS ON BOTTOMS UP.MUD WEIGHT BACK TO 8.6 PPG. PROCEED AHEAD. 22:30 - 00:00 1.50 DRILL N DPRB 11,420.00 PROD1 DIRECTIONAL DRILL 6 1/8 IN PRODUCTION HOLE TO 11,153 FT MD,8,693 FT TVD.PUMP AT 275 GPM WITH 2250 PSI ON BOTTOM,2130 PSI OFF BOTTOM.WOB 5-15K.ROTATE AT 80 RPM WITH 9K TORQUE ON BOTTOM,8K TORQUE OFF BOTTOM.MUD WEIGHT IN AND OUT 8.65 PPG.LOSSES AT 30 BPH.AST- 17.04,ADT-2.82. 6/26/2011 00:00 - 09:30 9.50 DRILL N DPRB 11,420.00 PROD1 DIRECTIONAL DRILL 6 118 IN PRODUCTION HOLE TO 11,420 FT MD.PUMP AT 275 GPM WITH 2350 PSI.WOB 5-15K. ROTATE AT 80 RPM WITH 9K TORQUE.MUD WEIGHT IN AND OUT 8.6 PPG. LOSSES AT 30 BPH. UP WEIGHT 207K, DOWN 151K, RT 168K. 09:30 - 12:00 2.50 DRILL P PROD1 DIRECTIONAL DRILL 6 1/8 IN PRODUCTION HOLE TO 11,491 FT MD,8,749 FT TVD.PUMP AT 275 GPM WITH 2440 PSI ON BOTTOM,2200 PSI OFF BOTTOM.WOB 5-15K. ROTATE AT 80 RPM WITH 9K TORQUE.MUD WEIGHT IN AND OUT 8.6 PPG.LOSSES AT 30-35 BPH. UP WEIGHT 207K, DOWN 151K,RT 168K. 12:00 - 21:30 9.50 DRILL P PROD1 PJSM.DIRECTIONAL DRILL 6 1/8 IN PRODUCTION HOLE TO 11,775 FT MD,8,757 FT TVD.PUMP AT 275 GPM WITH 2440 PSI ON BOTTOM,2210 PSI OFF BOTTOM.WOB 5-13K. ROTATE AT 80 RPM WITH 8K TORQUE OFF BOTTOM,9K TORQUE ON BOTTOM.MUD WEIGHT IN AND OUT 8.65 PPG. LOSSES AT 30-35 BPH. UP WEIGHT 205K, DOWN 151K, RT 172K. Printed 8/9/2011 10:16:28AM rth America -ALASKA- BP Page 50 of 58 Operation Summary Report Common Well Name:K-10 AFE No Event Type: RE-ENTER-ONSHORE(RON) Start Date:4/27/2011 End Date:7/4/2011 X3-00XCJ-C(4,684,455.00) Project: Prudhoe Bay Site: PB K Pad Rig Name/No.: DOYON 25 Spud Date/Time:4/24/2001 12:00:00AM Rig Release: Rig Contractor: DOYON DRILLING INC. UWI:500292176200 Active Datum: K-10C @66.39ft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (ft) 21:30 - 00:00 2.50 DRILL P PROD1 PJSM. MUD WEIGHT IN AND OUT 8.65 PPG. PERFORM WIPER TRIP TO 11,480 FT MD. PUMP OUT AT 84 GPM WITH 675 PSI RUNNING AT 190 FPH.NO HOLE PROBLEMS NOTED ON WIPER. JEFF JONES WITH AOGCC GIVEN 24 HOUR NOTICE AT 15:30 HOURS FOR UPCOMING BOPE TEST. AST-8.61,ART-3.93. 6/27/2011 00:00 - 02:00 2.00 DRILL P PROD1 PJSM.MUD WEIGHT IN AND OUT 8.65 PPG. PERFORM WIPER TRIP TO 11,300 FT MD. PUMP OUT AT 84 GPM WITH 675 PSI RUNNING AT 190 FPH. NO HOLE PROBLEMS NOTED ON WIPER. 02:00 - 04:00 2.00 DRILL P PROD1 PJSM. DIRECTIONAL DRILL 6 1/8 IN PRODUCTION HOLE TO 11,846 FT MD,8,763 FT TVD.PUMP AT 275 GPM WITH 2550 PSI ON BOTTOM,2100 PSI OFF BOTTOM.WOB 4-11K. ROTATE AT 80 RPM WITH 7K TORQUE OFF BOTTOM,9K TORQUE ON BOTTOM.MUD WEIGHT IN AND OUT 8.7 PPG.LOSSES AT 30-35 BPH. UP WEIGHT 204K, DOWN 142K, RT 168K. 04:00 - 09:00 5.00 LCR N DPRB 11,350.00 PROD1 PJSM. BACKREAM AND WIPE FIRST STAND OUT.TAKE SURVEYS AND PUMP OFF BOTTOM AT 275 GPM WITH 1900 PSI TO 11,400 FT MD.SLOW PUMPS TO 84 GPM AND PULL AT 190 FPH THROUGH KAVIK SHALE TO 11,300 FT MD.CONTINUE TO POOH TO 7 IN SHOE PUMPING AT 84 GPM PULLING AT NORMAL SPEED.ONE OVERPULL OF 35K AT 11,290 FT MD.CLEANED UP.PULL TO 10,250 FT MD. 09:00 - 10:00 1.00 LCR N DPRB 11,350.00 PROD1 PJSM.DROP SILVER CIRC SUB OPENING BALL.PUMP ON SEAT AT 84 GPM WITH 590 PSI WITH 36 BBLS. PRESSURE UP TO 2600 PSI TO CYCLE OPEN. BRING PUMPS UP TO 275 GPM WITH 820 PSI TO VERIFY CIRC SUB OPEN.NO MWD DETECTION. DROP BHA CLOSING BALL ON SEAT. 10:00 - 12:00 2.00 LCR N DPRB 11,350.00 PROD1 PJSM. RIG UP SCH PUMPING UNIT. HOLD PRE JOB WITH CREWS.MIX REMAINDER OF EZ SQUEEZE MATERIAL IN PILL PIT.FLOOD LINES AND PRESSURE TEST TO 3500 PSI. PUMP 66 BBL EZ SQUEEZE PILL TO SCH PUMPING UNIT. 12:00 - 12:30 0.50 LCR N DPRB 11,350.00 PROD1 PUMP 66 BBLS OF 50 PPB EZ SQUEEZE LCM PILL WITH SCH PUMPING UNIT. 12:30 - 13:00 0.50 LCR N DPRB 11,350.00 PROD1 TRANSFER 20 BBLS DRILLING FLUID TO SCH PUMPING UNIT AND DISPLACE LCM PILL WITH 20 BBLS DRILLING FLUID FROM SCH TO FLUSH LINES.SWITCH OVER TO RIG AND DISPLACE WITH ANOTHER 27 BBLS DRILLING FLUID TO SPOT PILL AT THE CIRC SUB. Printed 8/9/2011 10:16:28AM rth America -ALASKA- BP Page 51 of 58 Operation Summary Report Common Well Name:K-10 AFE No Event Type: RE-ENTER-ONSHORE(RON) Start Date:4/27/2011 End Date: 7/4/2011 X3-00XCJ-C(4,684,455.00) Project:Prudhoe Bay Site: PB K Pad Rig Name/No: DOYON 25 Spud Date/Time:4/24/2001 12:00:00AM Rig Release: Rig Contractor: DOYON DRILLING INC. UWI:500292176200 Active Datum:K-10C @66.39ft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (ft) 13:00 - 13:45 0.75 LCR N DPRB 11,350.00 PROD1 CLOSE ANNULAR PREVENTER AND START PUMPING FLUID INTO FORMATION. PUMP 40 BBLS OF DRILLING FLUID AND 20 BBLS OF LCM PILL FOR A TOTAL OF 60 BBLS SQUEEZED INTO THE FORMATION.LEAVING 46 BBLS OF EZ SQUEEZE LCM PILL IN OPEN HOLE. PUMP AT 105 GPM INITIAL CIRCULATING PRESSURE:680 PSI 10 BBLS780 PSI 25 BBLS870 PSI 40 BBLS943 PSI 50 BBLS1020 PSI 60 BBLS1150 PSI SHUT DOWN 13:45 - 15:00 1.25 LCR N DPRB 11,350.00 PROD1 MONITOR PRESSURE AND LET BLEED DOWN. MINUTESPRESSURE 1480 2457 3403 4390 5381 6363 9317 15292 20280 25260 30183 35155 45133 55103 60 83 70 47 OPEN UP ANNULAR PREVENTER AND BLEED OFF PRESSURE. 15:00 - 15:45 0.75 LCR N DPRB 11,350.00 PROD1 CIRCULATE OVER THE TOP OF THE HOLE. 15:45 - 16:00 0.25 LCR N DPRB 11,350.00 PROD1 CLOSE ANNULAR PREVENTER AND SQUEEZE 10 BBLS LCM PILL SQUEEZE#1 1 BBL320 PSIO MIN500 PSI 2 BBLS400 PSIS MIN260 PSI 3 BBLS490 PSI10 MIN233 PSI 4 BBLS540 PSI15 MIN217 PSI 5 BBLS570 PSI20 MIN193 PSI 6 BBLS602 PS125 MIN180 PSI 7 BBLS620 PSI30 MIN- , 8 BBLS680 PSI 9 BBLS710 PSI 10 BBLS733 PSI Printed 8/9/2011 10:16:28AM rth America -ALASKA- BP Page 52 of 58 Operation Summary Report Common Well Name: K-10 AFE No Event Type: RE-ENTER-ONSHORE(RON) Start Date:4/27/2011 End Date: 7/4/2011 X3-00XCJ-C(4,684,455.00) Project:Prudhoe Bay Site:PB K Pad Rig Name/No.: DOYON 25 Spud Date/Time:4/24/2001 12:00:00AM Rig Release: Rig Contractor: DOYON DRILLING INC. UWI: 500292176200 Active Datum: K-10C @66.39ft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (ft) 16:00 - 16:45 0.75 LCR N DPRB 11,350.00 PROD1 CLOSE ANNULAR PREVENTER AND SQUEEZE 10 BBLS LCM PILL SQUEEZE#2 1 BBL303 PSIO MIN500 PSI 2 BBLS453 PSI5 MIN290 PSI 3 BBLS667 PSI10 MIN240 PSI 4 BBLS720 PSI15 MIN217 PSI 5 BBLS740 PSI20 MIN200 PSI 6 BBLS757 P5125 MIN180 PSI 7 BBLS770 PSI30 MIN- 8 BBLS767 PSI 9 BBLS770 PSI 10 BBLS790 PSI 16:45 - 17:25 0.67 LCR N DPRB 11,350.00 PROD1 CLOSE ANNULAR PREVENTER AND SQUEEZE 10 BBLS LCM PILL SQUEEZE#3 1 BBL420 PSIO MIN650 PSI 2 BBLS607 PSI5 MIN350 PSI 3 BBLS670 PSI10 MIN303 PSI 4 BBLS720 PSI15 MIN280 PSI 5 BBLS740 PSI20 MIN263 PSI 6 BBLS767 PS125 MIN245 PSI 7 BBLS787 PSI30 MIN228 PSI 8 BBLS800 PSI 9 BBLS807 PSI 10 BBLS822 PSI 17:25 - 19:30 2.08 LCR N DPRB 11,350.00 PROD1 PJSM. BLEED OFF PRESSURE.OPEN ANNULAR. RIG DOWN.CLEAR AND CLEAN FLOOR. RACK BACK 2 STANDS.WELL STATIC.MUD WEIGHT 8.5 PPG.STATIC LOSSES AT ZERO. 19:30 - 22:00 2.50 DRILL N DPRB 11,350.00 PROD1 PJSM. BRING RTTS UP BEAVER SLIDE.MU TO STAND 101 AND RIH.S.ET RTTS PACKER AS PER HES REP. UP WEIGHT 189K, DOWN 146K.TEST PACKER TO 250 PSI LOW,2000 PSI HIGH FOR 5 CHARTED MINUTES EACH- PASS.PULL AND LAY DOWN RUNNING TOOL. 22:00 - 23:00 1.00 DRILL N DPRB 11,350.00 PROD1 PJSM. RU TO TEST BOPE.TEST WITNESS WAIVED BY JEFF JONES WITH AOGCC. 23:00 - 00:00 1.00 BOPSUR P PROD1 HOLD BOP DRILL.SHUT IN WELL AND CIRCULATE THROUGH CHOKE AT 2 BPM TO FILL UP GAS BUSTER AND SURFACE LINES. PJSM.TEST BOPE TO 250 PSI LOW,3500 PSI bo e HIGH AS PER AOGCC AND BP POLICY.TEST ANNULAR PREVENTER TO 250 PSI LOW,3500 7 PSI HIGH AS PER AOGCC AND BP POLICY. EACH TEST 5 CHARTED MINUTES.TEST THE UPPER VARIABLES AND LOWER VARIABLES WITH 4 IN AND 4 1/2 IN TEST JOINTS.TEST THE ANNULAR PREVENTER WITH 4 IN TEST JOINT.NO FAILED TESTS.TEST WITNESS WAIVED BY JEFF JONES WITH AOGCC.TEST WITNESSED BY WSL MITCH SKINNER AND TOURPUSHER ERIC RODLAND. CLOSING TIMES: ANNULAR PREVENTER:29 SEC. TOP RAMS:22 SEC. BOTTOM RAMS:20 SEC. BLIND SHEARS:30 SEC. HCR KILL:3 SEC. HCR CHOKE:3 SEC. Printed 8/9/2011 10:16:28AM rth America -ALASKA- BP Page 53 of 58 Operation Summary Report Common Well Name:K-10 AFE No Event Type: RE-ENTER-ONSHORE(RON) Start Date:4/27/2011 End Date:7/4/2011 X3-00XCJ-C(4,684,455.00) Project: Prudhoe Bay Site: PB K Pad Rig Name/No.: DOYON 25 Spud Date/Time:4/24/2001 12:00:00AM Rig Release: Rig Contractor: DOYON DRILLING INC. UWI:500292176200 Active Datum: K-10C @66.39ft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (ft) 6/28/2011 00:00 - 06:00 6.00 BOPSUR P PROD1 PJSM.TEST BOPE TO 250 PSI LOW,3500 PSI HIGH AS PER AOGCC AND BP POLICY.TEST ANNULAR PREVENTER TO 250 PSI LOW,3500 PSI HIGH AS PER AOGCC AND BP POLICY. EACH TEST 5 CHARTED MINUTES.TEST THE UPPER VARIABLES AND LOWER VARIABLES WITH 4 IN AND 4 1/2 IN TEST JOINTS.TEST THE ANNULAR PREVENTER WITH 4 IN TEST JOINT.NO FAILED TESTS.TEST WITNESS WAIVED BY JEFF JONES WITH AOGCC. TEST WITNESSED BY WSL MITCH SKINNER AND TOURPUSHER ERIC RODLAND. -PERFORMED ACCUMULATOR TEST: SYSTEM PRESSURE 3,000-PSI, PRESSURE AFTER CLOSING ALL RAMS AND ANNULAR PREVENTER-1,750-PSI. RECOVERED 1ST 200-PSI-20 SECONDS. FINAL PRESSURE OBTAINED-102 SECONDS. 6 NITROGEN BOTTLES,AVERAGE PRESSURE=2,458-PSI. PER API RP 53--FUNCTION AND RECORD RESPONSE TIME OF ACTIVATION AND FULL CLOSURE AS FOLLOWS: LOWER PIPE RAMS- 20 SEC.BLIND/SHEAR RAMS-18 SEC.UPPER PIPE RAMS-22 SEC.ANNULAR-29 SEC.HCR KILL-3 SEC.HCR CHOKE-3 SEC. 06:00 - 07:00 1.00 BOPSUR P PROD1 PULL TEST PLUG&WEAR BUSHING. R/D BOP TEST EQUIP. 07:00 - 08:00 1.00 DRILL P PROD1 M/U RTTS PACKER RUNNING TOOL.RELEASE RTTS PACKER WITH THE ANNULAR PREVENTER CLOSED. (PSI=0 AFTER RELEASING PACKER)MONITOR WELL. L/D RTTS PACKER ASSEMBLY&RUNNING TOOL. 08:00 - 10:30 2.50 DRILL N DPRB 11,845.98 PROD1 RIH 2 STANDS FROM 7"SHOE 10,272'TO 10,284'-MD.PUMP DOWN 1.76"(BALL#6)AT 20 SPM,440-PSI.BALL SEATED 165 STROKES.PRESSURE TO 1,500 PSI,STAGE TO 2,450-PSI.CIRC SUB SHIFTED CLOSED AT 2,450-PSI. CBU AT 270 GPM,1,900-PSI.4,500 TOTAL STROKES.NOTED GAS BREAKING OUT AT 1,700 STROKES.MONITOR WELL(STATIC). MW 8.6 PPG. 10:30 - 13:00 2.50 DRILL N DPRB 11,845.98 PROD1 RIH ON ELEVATORS FROM 10,284'TO 10,800'- MD.ORIENT LS FOR ENTERING SIDETRACK. CONTINUE RIH,OBTAIN DEVIATION SURVEY TO ENSURE IN SIDETRACK.AT 10,900'-MD. RIH TO 11,773'-MD.WIPE&WORK THROUGH AREAS AT 11,285',11,340-MD,35K DRAG.MW IN 8.6 PPG,MW OUT 8.6 PPG.WASH LAST STAND TO TD 11,846'-MD.GPM-250, 2,000-PSI, RPM-50,TRQ-8.5K. CBU INTO 7"CSG.OBTAIN SPR'S PRIOR TO DRILLING. Printed 8/9/2011 10:16:28AM rth America -ALASKA- BP Page 54 of 58 Operation Summary Report Common Well Name: K-10 AFE No Event Type: RE-ENTER-ONSHORE(RON) Start Date:4/27/2011 End Date:7/4/2011 X3-00XCJ-C(4,684,455.00) Project: Prudhoe Bay Site: PB K Pad Rig Name/No.: DOYON 25 Spud Date/Time:4/24/2001 12:00:00AM Rig Release: Rig Contractor:DOYON DRILLING INC. UWI:500292176200 Active Datum: K-10C @66.39ft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (ft) 13:00 - 00:00 11.00 DRILL P PROD1 DIRECTIONALLY DRILL 6-1/8"PROD. HOLE FROM 11,846'TO 12,439'-MD,TVD 8,716' -PUW 205K,SOW 143K, ROT 172K -275 GPM, PSI OFF 2,240, PSI ON 2,450 -100 RPM,TQ OFF 9K,TQ ON 10K -WOB 15K 12,344'-MD TVD-8,723' MW-8.6 PPG #1 MP 20-SPM 740-PSI 30-SPM 960-PSI #2MP 20-SPM 760-PSI 30-SPM 940-PSI 6/29/2011 00:00 - 07:00 7.00 DRILL P PROD1 DIRECTIONALLY DRILL 6-1/8"PROD. HOLE FROM 12,439'TO 12,835'-MD -PUW 206K,SOW 143K,ROT 165K -275 GPM, PSI OFF 2,250, PSI ON 2,500 -100 RPM,TQ OFF 9K,TQ ON 10K -WOB 7K 07:00 - 08:00 1.00 DRILL N SFAL 12,834.97 PROD1 TROUBLESHOOT-HALLIBURTON(SPERRY) MWD/LWD REAL TIME SURFACE DATA ACQUISITION EQUIPMENT. 08:00 - 00:00 16.00 DRILL P PROD1 DIRECTIONALLY DRILL 6-1/8"PROD. HOLE FROM 12,835'TO 13,625'-MD, TVD 8,729' -PUW 217K,SOW 146K, ROT 177K -275 GPM, PSI OFF 2,330, PSI ON 2,540 -100 RPM,TQ OFF 7-8K,TQ ON 9-10K -WOB9K 13,105'-MD TVD-8,729' MW-8.6 PPG #1 MP 20-SPM 720-PSI 30-SPM 920-PSI #2MP 20-SPM 720-PSI 30-SPM 940-PSI 6/30/2011 00:00 - 00:00 24.00 DRILL P PROD1 DIRECTIONALLY DRILL 6-1/8"PROD. HOLE FROM 13,625'TO 14524'-MD, TVD 8,697' ✓ -PUW 217K,SOW 135K, ROT 170K -275 GPM, PSI OFF 2,580, PSI ON 2,925 -100RPM,TQ OFF 7-8K,TQ ON 10-11K -WOB 13K 14,524'-MD TVD-8,697' MW-8.9 PPG #1 MP 20-SPM 820-PSI 30-SPM 1,050-PSI #2MP 20-SPM 850-PSI 30-SPM 1,080-PSI 7/1/2011 00:00 - 05:30 5.50 DRILL P PROD1 DIRECTIONALLY DRILL 6-1/8"PROD.HOLE /fa _FROM 14,524'TO TD 14,961'-MD -PUW 206K,SOW 138K,ROT 152K -275 GPM, PSI OFF 2,620, PSI ON 2,850 -100 RPM,TQ OFF 9-11K,TQ ON 9K -WOB 14K -MW IN 8.9 PPG,MW OUT 8.9 PPG LOSS AVERAGE WHILE DRILLING:30-40 BPH. 14,943'-MD TVD-8,641' MW-8.9 PPG #1MP 20-SPM 880-PSI 30-SPM 1,110-PSI #2MP 20-SPM 880-PSI 30-SPM 1,100-PSI 05:30 - 08:30 3.00 DRILL P PROD1 CBU&CONDITION HOLE WHILE REAMING UP FROM 14,943'T/14,526'-MD -275 GPM, PSI 2,650 -100 RPM,TQ 7-8K -MW IN 8.8 PPG,MW OUT 8.9 PPG Printed 8/9/2011 10:16:28AM rth America -ALASKA- BP Page 55 of 58 Operation Summary Report Common Well Name:K-10 AFE No Event Type: RE-ENTER-ONSHORE(RON) Start Date:4/27/2011 End Date:7/4/2011 X3-00XCJ-C(4,684,455.00) Project: Prudhoe Bay Site: PB K Pad Rig Name/No.: DOYON 25 Spud Date/Time:4/24/2001 12:00:00AM Rig Release: Rig Contractor: DOYON DRILLING INC. UWI:500292176200 Active Datum: K-10C @66.39ft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (ft) 08:30 - 18:30 10.00 DRILL P PROD1 PUMP POOH FROM 14,526'T/10,262'-MD. -2 BPM,720 PSI, 25K OVERPULL AT 11,803'-11,778'-MD WORK &WIPE THROUGH SAME. (CLEAN AFTER)NO ADDITIONAL ISSUES ON REMAINDER OF TRIP. MONITOR WELL 10 MIN.AT 10,262'STATIC LOSS AVERAGE 8 BPH. PULL INTO 7"CSG T/10,167'-MD. -PUW 196K,SOW 145 -MW 8.7 PPG 18:30 - 23:00 4.50 DRILL P PROD1 PJSM-SERVICE&PERFORM MONTHLY PM ON TD.CIO HT-38 TD SAVER SUB. MONITOR WELL ON TRIP TANK.STATIC LOSS RATE 8 BPH. 23:00 - 00:00 1.00 DRILL P PROD1 PJSM-RIH F/10'167'TO 10,736.MW 8.7 PPG -PUW 196K,SOW 145K TRIP CLEAN TO 10,736'-MD 24 HR TOTAL MUD LOSS=361 BBL'S -TOTAL LOSSES TO INTERVAL=8,843 BBL -DYNAMIC LOSSES WHILE PUMPING 275 GPM=30-40 BPH -STATIC LOSSES=8 BPH 7/2/2011 00:00 - 03:00 3.00 DRILL P PROD1 RIH F/10,736'T/14,055'-MD.MW 8.7 PPG. AT SIDETRACK INTERVAL 10,810'ORIENT TF HS TO SIMULATE WORST CASE SCENARIO WITH LINER RUN. NOT ABLE TO PASS THE SIDETRACK INTERVAL ORIENTED HS PAST 10,835'.POOH T/10,750'ORIENT TF TO 160L, WORK&REAM THROUGH AREA SEVERAL TIMES. STILL UNABLE TO PASS THROUGH INTERVAL ORIENTED HS.CONSULTED WITH ODE. DECISION TO RIH ORIENTED 150L. OBTAIN SURVEY AT 10,920'TO ENSURE IN SIDETRACK INTERVAL. STATIC LOSSES AVERAGE 8 BPH. 03:00 - 05:30 2.50 DRILL P PROD1 RIH ON ELEVATORS F/10,923'.T/14,230'. AT 14,230'DECREASING HOOKLOAD -PUW 215K,SOW 148K. MW OUT 8.7, MW IN 8.7 STATIC MUD LOSS OF 8 BPH. 05:30 - 06:30 1.00 DRILL P PROD1 CBU-ROTATE&RECIPROCATE F/14,230'T/ 14,139. -GPM 275, PSI 2,350 -RPM 100,TQ 6-8K TOTAL PUMPED 436 BBLS. 06:30 - 08:00 1.50 DRILL P PROD1 RIH ON ELEVATORS F/14,230'T/14,325' PUMP THROUGH INTERMITTENT TIGHT SPOT 14,325'. PUMP T/14,430' CONTINUE RIH F/14,430'T/14,943.WASH LAST STAND TO BOTTOM 14,943' Printed 8/9/2011 10:16:28AM rth America -ALASKA- BP Page 56 of 58 Operation Summary Report Common Well Name: K-10 AFE No Event Type: RE-ENTER-ONSHORE(RON) Start Date:4/27/2011 End Date:7/4/2011 X3-00XCJ-C(4,684,455.00) Project: Prudhoe Bay Site: PB K Pad Rig Name/No.: DOYON 25 Spud Date/Time:4/24/2001 12:00:00AM Rig Release: Rig Contractor:DOYON DRILLING INC. UWI:500292176200 Active Datum:K-10C @66.39ft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (ft) 08:00 - 10:00 2.00 DRILL P PROD1 EST.CIRC.STAGE UP PUMP.CBU-ROTATE& RECIPROCATE F/14,943'T/14,910' -PUW 212K,SOW 140K, ROT 165K -252 GPM, PSI 2,180 -80 RPM,TQ 7-9K TOTAL 508 BBLS PUMPED. 14,943'-MD TVD-8,641 ' MW-8.7 PPG #1 MP 20-SPM 780-PSI 30-SPM 1020-PSI #2MP 20-SPM 800-PSI 30-SPM 1020-PSI 10:00 - 13:00 3.00 DRILL P PROD1 BACK-REAM POOH F/14,943'T/14,053' -PUW 205K,SOW 140K, ROT 155K -255 GPM, PSI 2,040 -100 RPM,TQ 8-10K MONITOR WELL 10 MIN AT 14,053' LOSS RATE PUMPING POOH 20 BPH. 13:00 - 13:30 0.50 DRILL P PROD1 RIH F/14,053 T/14,337'WORK TIGHT SPOT AT 14,337'.CONTINUE TO RIH T/14,526' 13:30 - 23:30 10.00 DRILL P PROD1 BACK-REAM POOH F/14.526'T/12 916' -255 GPM, PSI 1,977 -100-85 RPM,TQ 7-10K PUMP POOH F/12,916'T/10,274'AT 7"CSG SHOE. WIPE TIGHT SPOT 11,240'.NOT SEEN AFTERWARDS. -2 BPM, PSI 630 -PUW 208K,SOW 143K MW IN 8.7 PPG.MW OUT 8.7 PPG 23:30 - 00:00 0.50 DRILL P PROD1 10,262'-MONITOR WELL 10 MIN.DROP 1.76" BALL&OPEN CCV CIRC VALVE.BALL ON SEAT 290 STKS. PRESSURE TO 2,300-PSI& SHIFT CCV OPEN.CIRC CSG CLEAN STAGING UP PUMPS. ROTATE&RECIPROCATE -PUW 195,SOW 152, ROT 165 -600 GPM, PSI 2,076, 100 RPM ROTATE&RECIPROCATE CCV THROUGH DEPTH F/10,082'T/9,982' MW IN 8.7 PPG,MW OUT 8.7 PPG. STATIC LOSS AT SHOE 1-2 BPH. DYNAMIC LOSS AT 500 GPM,50 BPH. LOSSES LAST 24 HRS=400 BBL'S TOTAL LOSSES FOR INTERVAL=9,243 BBL'S 7/3/2011 00:00 - 01:00 1.00 DRILL P PROD1 10,285'BIT DEPTH.CIRCULATE CSG CLEAN THROUGH OPEN CIRC SUB(CCV). ROTATE&RECIPROCATE CCV THROUGH DEPTH F/10,082'T/9,982'-MD -PUW 195,SOW 152, ROT 165 -500 GPM, PSI 1,700 PSI, 100 RPM MW IN 8.7 PPG,MW OUT 8.7 PPG. STATIC LOSS AT SHOE 1-2 BPH. DYNAMIC LOSS AT 500 GPM,50 BPH. 01:00 - 02:00 1.00 DRILL P PROD1 MONITOR WELL(STATIC).POOH ON ELEVATORS F/10,285'T/10,070'-MD PUMP DRY JOB. BLOW DOWN TD.DROP 1.92" DRIFT DOWN DP. 02:00 - 07:30 5.50 DRILL P PROD1 POOH ON ELEVATORS F/10,070'T/498'-MD. HOLE TOOK 99 BBL'S OVER CALCULATED FILL. 07:30 - 08:30 1.00 DRILL P PROD1 MONITOR WELL.-4.5 BPH STATIC LOSS. PJSM FOR L/D BHA.C/O SLIP INSERTS. Printed 8/9/2011 10:16:28AM rth America -ALASKA- BP Page 57 of 58 Operation Summary Report Common Well Name: K-10 AFE No Event Type: RE-ENTER-ONSHORE(RON) Start Date:4/27/2011 End Date: 7/4/2011 X3-00XCJ-C(4,684,455.00) Project:Prudhoe Bay Site: PB K Pad Rig Name/No.: DOYON 25 Spud Date/Time:4/24/2001 12:00:00AM Rig Release: Rig Contractor: DOYON DRILLING INC. UWI: 500292176200 Active Datum:K-10C @66.39ft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (ft) 08:30 - 10:00 1.50 DRILL P PROD1 L/D BHA F/498'T/142'-MD.L/D HWDP, NMFC& CCV CIRC SUB. 10:00 - 11:00 1.00 DRILL P PROD1 PJSM-PULL LWD NUKE SOURCE. DOWNLOAD MWD. 11:00 - 12:30 1.50 DRILL P PROD1 L/D REMAINDER OF BHA F/142-MD'. DRAIN MUD MOTOR, BREAK OUT BIT.L/D MOTOR. -GRADE BIT(3-4-CT-A-X-2-BT-TD).NO VISUAL INDICATION OF DAMAGE FOR BHA NOTED. 12:30 - 13:00 0.50 DRILL P PROD1 CLEAN&CLEAR RIG FLOOR.BLOW DOWN TD&LINES. 13:00 - 15:30 2.50 CASING P RUNPRD PJSM-R/U 4.5 LINER RUNNING EQUIPMENT. STATIC LOSS O-F 13 BPH. 15:30 - 23:00 7.50 CASING P RUNPRD M/U 4.5"12.6 PPF.L-80 IBT-M PRODUCTION LINER SHOE TRACK.BAKER LOC CONNECTIONS.AVERAGE TRQ 2,800 FT-LB. FILL&CHECK FLOAT. (OK) CONTINUE RIH WITH LINER F/171'T/ 3,946'-MD. FILL EACH JNT,TOP OFF EACH 15 JNTS. LOSS AVERAGE TO WELL RIH 13 BPH. -MW IN 8.8 PPG,MW OUT 8.8 PPG 23:00 - 23:30 0.50 CASING P RUNPRD SERVICE TD.TROUBLESHOOT PIPE SKATE SHOVEL. 23:30 - 00:00 0.50 CASING P RUNPRD CONTINUE RIH W/4.5"12.6 PPF,L-80 IBT-M LINER F/3,946'17-4,275.-MD. -PUW 89K,SOW 9-3K -MW IN 8.8, MW OUT 8.8 -24 HR LOSS 334 BBL'S -TOTAL LOSS FOR INTERVAL 9,577'BBL'S 7/4/2011 00:00 - 01:30 1.50 CASING P RUNPRD RIH WITH 4-1/2"12.6 PPF.L-80 IBT-M PROD. LINER PER PROGRAM F/4,275'T/4,811'-MD. -AVERAGE TRQ=2,800 FT/LBS. -FILL EACH JNT,TOP OFF EACH 15 JNTS -MW IN 8.8 PPG,MW OUT 8.8 AVERAGE LOSS 13 BPH. 01:30 - 03:00 1.50 CASING P RUNPRD P/U&M/U 7"X 4-1/2"BAKER FLEXLOCK LINER HANGER PACKER ASSEMBLY.STAGE UP PUMP WHILE M/U PAL MIX&PLACING INTO TIE-BACK SLEEVE. CIRCULATE 2 LINER VOLUMES. -PUW 98K,SOW 100K -252 GPM,450 PSI. E - -MW IN 8.8,MW OUT 8.8 [ 03:00 - 04:00 1.00 CASING P RUNPRD BREAK PUP OUT OF SHEAR JNT.P/U CEMENT HEAD, INSTALL&TRQ JNT ON BOTTOM OF CEMENT HEAD.L/D CEMENT HEAD TO PIPE SHED. -CHANGE SLIP INSERTS TO 4"OUT OF CRITICAL PATH. 04:00 - 09:00 5.00 CASING P RUNPRD RIH W/LINER ON 4"DP F/4,852'T/10,254'-MD AT 90 FT-MIN. FILL EACH 10 STANDS. -PUW 163K,SOW 134K. -MW IN 8.8 PPG,MW OUT 8.8 PPG -AVERAGE LOSS RATE 13 BPH. Printed 8/9/2011 10:16:28AM rth America -ALASKA- BP Page 58 of 58 Operation Summary Report Common Well Name:K-10 AFE No Event Type: RE-ENTER-ONSHORE(RON) Start Date:4/27/2011 End Date:7/4/2011 X3-00XCJ-C(4,684,455.00) Project: Prudhoe Bay Site: PB K Pad Rig Name/No.: DOYON 25 Spud Date/Time:4/24/2001 12:00:00AM Rig Release: Rig Contractor: DOYON DRILLING INC. UWI: 500292176200 Active Datum: K-10C @66.39ft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (ft) 09:00 - 10:00 1.00 CASING P RUNPRD 10,254'-MD STAGE UP PUMP.CIRCULATE 2 LINER VOLUMES PRIOR TO ENTERING OPEN HOLE. -PUW 163K,SOW 134K. -210 GPM,760 PSI -MONITOR WELL(STATIC) 10:00 - 14:30 4.50 CASING P RUNPRD RIH W/LINER ON 4"DP F/10,254'T/ 14,943'-MD AT 90 FT-MIN.FILL EACH 10 STANDS. -PUW 215K,SOW 135K. -MW IN 8.8 PPG,MW OUT 8.8 PPG -AVERAGE LOSS RATE 13 BPH. 14:30 - 15:30 1.00 CASING P RUNPRD BLOW DN TD. M/U CEMENT HEAD.RIH TAG BOTTOM AT TD 14,943'-MD. 15:30 - 17:30 2.00 CASING P RUNPRD EST.CIRCULATION STAGE UP PUMP. RECIPROCATE DP -2 BPM,630 PSI. -3 BPM,810 PSI. -4 BPM, 960 PSI. -5 BPM,1,150 PSI. -PUW 215K,SOW 135K. 17:30 - 18:30 1.00 CASING P RUNPRD WHILE CIRCULATING HOLD PJSM W/SLB, ALL 3RD PARTY&RIG PERSONNEL FOR CEMENTING OPERATION. 18:30 - 21:00 2.50 CASING P RUNPRD LINE UP RIG TO CMT HOSE.PUMP CMT PER 1‘.0 PROGRAM. RECIPROCATE DP WHILE G PUMPING CEMENT-PUMP 25.5 BBL 11.5 PPG 5 MUDPUSH AT 5 BPM,800 PSI. ' -TEST LINES TO 4,800 PSI(OK).PUMP 170.6 , u BBL NEAT G CMT W/GAS BLOK,15.8 PPG, 1ST 50 BBL OF CMT CONTAINING CEMNET AT 5 BPM. ICP 1167 PSI, FCP 412. DROP DP WIPER DART&DISPLACE W/RIG AT 5 BPM,1,260 PSI.PUMPING 74 BBL PERF PILL. BUMP PLUG W/CORRECT VOL AT 172 BBL. PRESSURE UP SET LINER HANGER. BLEED PSI, ENSURE FLOATS HOLDING. -CEMENT IN PLACE 20:26 HRS. 21:00 - 22:00 1.00 CASING P RUNPRD SLACK OFF 40K, ENSURE PACKER IS SET. CIRCULATE B/U -10 BPM,1600 PSI.20 BBL CMT SEEN TO SURFACE. -WITH—20 BBLS OF LOSSES AS 170.6 BBLS OF CEMENT WERE PUMPED AROUND 4 1/2" LINER,AND GIVEN THAT 20 BBLS EXCESS CEMENT WERE CIRCULATED OFF THE TOL, THE ESTIMATED TOC FOR THIS 4 1/2" PRODUCTION LINER IS AT THE TOL AT 10,098'MD. 22:00 - 23:00 1.00 CASING P RUNPRD FLUSH MUD,CMT LINES&TD W/H20.BLOW DOWN TD,CMT LINES.L/D CMT HEAD. 23:00 - 00:00 1.00 CASING P RUNPRD CLEAN TRIP TANK 1,2&PIT 10 IN PREPARATION TO DISPLACE TO 8.5 PPG SEA WATER. SERVICE TD&RIG FLOOR EQUIP -TOTAL 24 HR LOSS 200 BBL -TOTAL LOSS FOR INTERVAL 9,779 BBL Printed 8/9/2011 10:16:27AM North America -ALASKA- BP Page 1 of 7 Operation Summary Report Common Well Name:K-10 AFE No Event Type: COM-ONSHORE(CON) Start Date: 7/5/2011 End Date:7/13/2011 X3-00XCJ-C(2,042,489.00) Project:Prudhoe Bay Site: PB K Pad Rig Name/No.:DOYON 25 Spud Date/Time:4/24/2001 12:00:00AM Rig Release: Rig Contractor: DOYON DRILLING INC. UWI:500292176200 Active Datum: K-10C @66.39ft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (ft) 7/5/2011 00:00 - 02:30 2.50 CASING P RUNPRD CLEAN PITS FOR DISPLACEMENT TO 8.5 PPG SEA-WATER. PERFORM PM'S ON TD, BLOCKS,CROWN,CATHEADS AND DEADMAN.SERVICE IRON DERRICK MAN,TD, ELEVATORS AND CROWN.CLEAN AND CLEAR RIG FLOOR.GENERAL HOUSKEEPING. 02:30 - 05:30 3.00 CASING P RUNPRD DISPLACE WELL FROM 8.7 PPG QUICKDRIL-N MUD TO 8.5 PPG SEA-WATER. ROTATE AND RECIPROCATE WHILE CIRCULATING. -PUW 176K,SOW 146K -265 GPM,610 PSI -55 RPM,TQ 4-5K MONITOR WELL(STATIC) SPR'S 10,098'-MD 8,039'-TVD,MW 8.5 PPG #1 MP 20-SPM 60-PSI 30-SPM 140-PSI #2MP 20-SPM 60-PSI 30-SPM 140-PSI 05:30 - 06:00 0.50 CASING P RUNPRD L/D CEMENT HEAD TO PIPE-SHED 06:00 - 11:30 5.50 CASING - P RUNPRD POOH WITH 4-IN DP AND LINER RUNNING TOOL ON ELEVATORS FROM 10,098'TO SURFACE.MONITOR WELL PRIOR TO L/D RUNNING TOOL.(STATIC) HOLE TOOK CORRECT DISPLACEMENT THROUGHOUT TRIP. NO ISSUES ON TRIP. -MW IN 8.5 PPG,MW OUT 8.5 11:30 - 12:00 0.50 CASING P RUNPRD L/D BAKER LINER RUNNING TOOL. WELL STATIC. 12:00 - 15:00 3.00 BOPSUR P RUNPRD R/U TO TEST BOPE EQUIPMENT. PULL WEAR RING, INSTALL TEST PLUG. -CIRCULATE THROUGH KILL LINE. FILL BOP STACK.8 BBLS TO FILL. -CLOSE ANNULAR, OPEN CHOKE TO GAS-BUSTER,17 BBLS TO FILL GAS-BUSTER. -CIRCULATE THROUGH GAS-BUSTER.4 BPM, 60 PSI. Printed 8/9/2011 10:16:59AM rth America -ALASKA- BP Page 2 of 7 Operation Summary Report Common Well Name: K-10 AFE No Event Type: COM-ONSHORE(CON) Start Date: 7/5/2011 End Date:7/13/2011 X3-00XCJ-C(2,042,489.00) Project:Prudhoe Bay Site: PB K Pad Rig Name/No.: DOYON 25 Spud Date/Time:4/24/2001 12:00:00AM Rig Release: Rig Contractor:DOYON DRILLING INC. UWI:500292176200 Active Datum:K-10C @66.39ft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (ft) 15:00 - 20:30 5.50 BOPSUR P RUNPRD PJSM.TEST BOPE TO 250-PSI LOW,3,500-PSI HIGH AS PER AOGCC AND BP POLICY. TEST WITNESSED BY AOGCC REPRESENTATIVE LOU GRIMALDI TEST ANNULAR PREVENTER TO 250 PSI LOW,3,500-PSI HIGH WITH 2-7/8-IN TEST JOINT.EACH TEST 5 CHARTED MINUTES. TEST THE UPPER VARIABLES AND LOWER VARIABLES WITH 2-7/8-IN AND 4 1/2-IN TEST ©�Q JOINTS.TEST THE ANNULAR PREVENTER Q(1� WITH 2-7/8-IN TEST JOINT.NO FAILED TESTS. y TEST WITNESSED BY WSL'S MIKE DINGER, G RICK DOLFI TOOLPUSHER SAM DYE,TOURPUSHER ERIC RODLAND. -PERFORMED ACCUMULATOR TEST: SYSTEM PRESSURE 3,000-PSI, PRESSURE AFTER CLOSING ALL RAMS AND ANNULAR PREVENTER-1,650-PSI. RECOVERED 1ST 200-PSI-21 SECONDS. FINAL PRESSURE OBTAINED-110 SECONDS. 6 NITROGEN BOTTLES,AVERAGE PRESSURE=2,350-PSI. PER API RP 53--FUNCTION AND RECORD RESPONSE TIME OF ACTIVATION AND FULL CLOSURE AS FOLLOWS: LOWER PIPE RAMS- 21 SEC.BLIND/SHEAR RAMS-33 SEC.UPPER PIPE RAMS-20 SEC.ANNULAR-23 SEC.HCR KILL-2 SEC. HCR CHOKE-2 SEC. 20:30 - 21:00 0.50 BOPSUR P RUNPRD R/D BOP TEST EQUIPMENT.PULL TEST PLUG AND INSTALL WEAR RING. 21:00 - 23:00 2.00 CASING P RUNPRD PJSM.R/U AND TEST 4-1/2-IN LINER 250 PSI LOW 5 MINUTES,3,500 PSI HIGH FOR 30 CHARTED MINUTES.GAIN APPROVAL FROM WTL TO PROCEED WITH OPERATIONS. 23:00 - 00:00 1.00 PERFOB P OTHCMP PJSM FOR R/U SLB PERFORATING ASSEMBLY.M/U SHEAR SAFETY JOINT. 7/6/2011 00:00 - 02:00 2.00 PERFOB P OTHCMP R/USO RUNSLB TCP PERFORATING ASSEMBLY. REMOVE SLIP CENTERING GUIDES,CHANGE ELEVATOR INSERTS.R/U 2-7/8-IN POWER TONGS. PJSM WITH SLB, DDI AND DOYON CASING. 02:00 - 11:30 9.50 PERFOB P OTHCMP P/U SLB 2-7/8-IN. HSD 6 SPF PERFORATING GUNS. RIH FROM SURFACE TO 2,852'-MD P/U FROM PIPE-SHED AND RIH WITH NEW 2-7/8-IN PAC PIPE. 2-7/8-IN. DP IS NEW, M/U TO SPEC.4,000 FT-LB, BREAK OUT, RE-DOPE AND TORQUE TO 4,000 FT-LB. RIH WITH SAME TO 4,152'-MD MW IN 8.5 PPG,MW OUT 8.5 PPG 11:30 - 12:00 0.50 PERFOB P OTHCMP MAKE UP 6-IN. BAKER NOGG AND X-OVERS TO 4-IN DP. 4,152'-MD, PUW 79K,SOW 83K 12:00 - 13:00 1.00 PERFOB P OTHCMP C/O PS-21 SLIP BUSHINGS TO 4-IN. DP SLIP SEGMENTS. 13:00 - 14:00 1.00 PERFOB P OTHCMP RIH WITH PERF GUNS ON 4-IN.DP FROM 4,152'TO 5,953'-MD. 14:00 - 16:00 2.00 PERFOB N RREP OTHCMP TROUBLESHOOT AND CHANGE OUT O RING SEALS ON IRON DERRICKMAN 16:00 - 17:00 1.00 PERFOB P OTHCMP CONTINUE RIH WITH 4-IN. DP FROM 5,953'TO 7,184'-MD. Printed 8/9/2011 10:16:59AM )rth America -ALASKA- BP Page 3 of 7 Operation Summary Report Common Well Name:K-10 AFE No Event Type:COM-ONSHORE(CON) Start Date:7/5/2011 End Date: 7/13/2011 X3-00XC.1-C(2,042,489.00) Project: Prudhoe Bay Site: PB K Pad Rig Name/No.: DOYON 25 Spud Date/Time:4/24/2001 12:00:00AM Rig Release: Rig Contractor: DOYON DRILLING INC. UWI:500292176200 Active Datum:K-10C @66.39ft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (ft) _ 17:00 - 17:30 0.50 PERFOB P OTHCMP TEST MICRO MOTIONS WITH#1 AND#2 MUD PUMPING THROUGH MUD MANIFOLD. 17:30 - 22:00 4.50 PERFOB P OTHCMP CONTINUE RIH WITH 4-IN.DP FROM 7,184'TO 11,829'-MD. NO INDICATIONS OR TROUBLE AT 4-1/2-IN. LINER TOP AT 10,098'-MD. 22:00 - 23:30 1.50 PERFOB P OTHCMP SERVICE RIG WHILE TROUBLESHOOTING IRON DERRICK MAN(IDM). 23:30 - 00:00 0.50 PERFOB P OTHCMP CONTINUE RIH WITH 4-IN.DP FROM 11,829' TO 12,303'-MD 7/7/2011 00:00 - 02:30 2.50 PERFOB P OTHCMP- CONTINUE RIH WITH SLB 2-7/8-IN.HSD 6 SPF PERFORATING GUNS ON 4-IN.DP FROM 12,303'TO 14,243'-MD.TAG NO GO AT TOP OF 4-1/2-IN.LINER,ON DEPTH 10,098'-MD. -PUW 203,SOW 142 -MW IN 8.5 PPG,MW OUT 8.5 PPG. NO TROUBLE AREAS. 02:30 - 03:00 0.50 PERFOB P OTHCMP DETERMINE SPACE OUT. RACK STAND-107 BACK IN DERRICK. P/U SINGLE FROM SHED AND PLACE ON DEPTH FOR PERFORATION INTERVALS. 03:00 - 04:00 1.00 PERFOB P OTHCMP STAGE UP PUMP,BREAK CIRCULATION FILL LINES.HOLD PJSM FOR PERFORATING. GPM 78,347 PSI,16%RETURNS. P_w� CLOSE ANNULAR,PRESSURE UP AND BLEED 1 hV PSI AS REQUIRED TO EXECUTE FIRING SEQUENCE.AT 03:58 HRS AUDIBLE CONFIRMATION AT SURFACE GUNS FIRED. AVERAGE LOSS TO WELL OF 3.5 BPH,LOSS IMMEDIATLY UPON GUNS FIRING 6 BBL'S MW IN 8.5 PGG,MW OUT 8.5 PPG. 04:00 - 05:30 1.50 PERFOB P OTHCMP POOH WITH 4-IN.DP AND PERF ASSEMBLY FROM 14,210'TO 11,732'-MD.LAST PERFORATED SECTION OF WELL AT 11,860'-MD. -PUW 208K,SOW 142K AVERAGE LOSS TO WELL 3.5-BPH 05:30 - 07:00 1.50 PERFOB P OTHCMP MONITOR WELL 10-MIN.CBU AT 11,732'-MD -243 GPM,1,380 PSI. PUMP 372 BBL'S TOTAL. 07:00 - 14:00 7.00 PERFOB P OTHCMP POOH, UD 4-IN DP IN DOUBLES TO PIPE-SHED FROM 11,732'TO 4,152'-MD 14:00 - 16:00 2.00 PERFOB P OTHCMP PJSM FOR UD 2-7/8-IN. PAC DP.CIO ELEVATOR INSERTS AND PS-21 INSERTS TO 2-7/8-IN.R/U POWER TONGS. 16:00 - 19:30 3.50 PERFOB P OTHCMP UD 2-7/8-IN PAC DP FROM 4,152'TO 2,600'-MD 19:30 - 20:30 1.00 PERFOB P OTHCMP PJSM FOR UD SLB TCP PERF GUNS. MONITOR WELL. FLAG OFF CELLAR AND BOPE DECK AREAS. 20:30 - 21:00 0.50 PERFOB P OTHCMP CONTINUE POOH, LID REMAINDER OF 2-7/8-IN DP FROM 2,600'TO 2,408'-MD 21:00 - 22:00 1.00 PERFOB P OTHCMP CHANGE HANDLING EQUIPMENT FROM 2-7/8-IN.TO 3-1/2-IN.C/O POWER TONGS. CLEAR PIPE SHED AND CASING SHED OF 2-7/8-IN PAC DP. 22:00 - 22:30 0.50 PERFOB P OTHCMP UD SLB FIRING HEAD FOR TCP PERF GUNS. 22:30 - 00:00 1.50 PERFOB P OTHCMP UD SHOT TCP PERF GUNS FROM 2,400'TO 2,059'-MD Printed 8/9/2011 10:16:59AM )rth America -ALASKA- BP Page 4 of 7 Operation Summary Report Common Well Name: K-10 AFE No Event Type: COM-ONSHORE(CON) Start Date: 7/5/2011 End Date:7/13/2011 X3-00XCJ-C(2,042,489.00) Project:Prudhoe Bay Site: PB K Pad Rig Name/No.: DOYON 25 Spud Date/Time:4/24/2001 12:00:00AM Rig Release: Rig Contractor: DOYON DRILLING INC. UWI:500292176200 Active Datum:K-10C @66.39ft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (ft) 7/8/2011 00:00 - 04:00 4.00 PERFOB P OTHCMP CONTINUE TO L/D SHOT SLB TCP PERF GUNS FROM 2,059'TO SURFACE. 04:00 - 05:30 1.50 PERFOB P OTHCMP CLEAN CLEAR RIG FLOOR.C/O ELEVATOR AND SLIP INSERTS TO 4-IN. R/D SLB EQUIPMENT AND CASING TONGS. 05:30 - 06:00 0.50 RUNCOM P RUNCMP SERVICE PS-21. R/U TO RUN 4"DP 06:00 - 09:30 3.50 RUNCOM P RUNCMP RIH TO 4,739'-MD WITH MULE SHOE SUB ON 4-IN DP FROM DERRICK TO L/D EXCESS DP IN DOUBLES TO PIPE-SHED. NO HOLE ISSUES ON TRIP. MW IN 8.5 PPG,MW OUT 8.5 PPG. 09:30 - 10:00 0.50 RUNCOM P RUNCMP TROUBLESHOOT IRON DERRICK MAN(IDM) .SERVICE RIG FLOOR EQUIPMENT. 10:00 - 11:30 1.50 RUNCOM P RUNCMP RIH WITH 4-IN DP FROM 4,739'TO 7,014'-MD -PUW 138K,SOW 130 11:30 - 12:00 0.50 RUNCOM P RUNCMP MONITOR WELL 10 MIN.STATIC LOSS OF 1 BPH. PJSM-UD DP 12:00 - 20:00 8.00 RUNCOM P RUNCMP L/D,4-IN DP AS SINGLES TO PIPE-SHED FROM 7,014'TO 3,104'-MD. UD,4-IN DP AS DOUBLES TO PIPE SHED FROM 3,104 TO SURFACE. STORE DOUBLES IN STORAGE TUBS IN SHED FOR UPCOMING WELL. 20:00 - 22:00 2.00 RUNCOM P RUNCMP MONITOR WELL,DRAIN BOP STACK, PULL WEAR RING.CLOSE BLINDS RAMS 32 SEC. C/O PS-21 SLIP SEGMENTS TO BUSHING INSERTS.R/U POWER TONGS,FOSV(TIW) AND XO. 22:00 - 00:00 2.00 RUNCOM P RUNCMP R/D BX ELEVATORS.CHANGE BAILS AND CONTINUE R/U 4-1/2-IN TBG HANDLING EQUIPMENT. -MW IN 8.5,MW OUT 8.5 -LOSS TO WELL SINCE PERFORATED 75 BBL. -24 HR LOSS 15 BBL -STATIC LOSS 1 BPH. 7/9/2011 00:00 - 00:30 0.50 RUNCOM P RUNCMP PJSM FOR DUMMY RUN WITH 4-1/2-IN, PRODUCTION TBG HANGER AND RUNNING 4-1/2-IN 12.6 PPF,VAM-TOP TBG. -TABLE TOP DISCUSSION,KICK WHILE TRIPPING D1.REVIEW BRIDGING DOCUMENTS, INDIVIDUAL ROLES, RESPONSIBILITIES. 00:30 - 01:00 0.50 RUNCOM P RUNCMP MAKE DUMMY RUN WITH 4-1/2-IN TBG HANGER.LAND HANGER 36.88 FT IN ON LANDING JNT.L/D HANGER AND LANDING JOINT. 01:00 - 06:00 5.00 RUNCOM P RUNCMP ' - ► A ► " :►1 ■ TNT PACKER.BAKER LOCK ALL CONNECTIONS BELOW PACKER.TRQ TURN 4-1/2-IN,12.6 PPF,VAM-TOP CONNECTIONS TO 4,440 FT-LBS.CONTINUE RIH WITH COMPLETION TBG PER PROGRAM TO 2,740'-MD.APPLY JET LUBE SEAL GAURD THREAD COMPOUND AND TRQ-TURN EACH CONNECTION TO 4,440 FT-LB -MW IN 8.5,MW OUT 8.5 06:00 - 07:00 1.00 RUNCOM P RUNCMP MONITOR WELL 1/2 BBL HR STATIC LOSS. CHANGE OUT CSG TONG HYD DUMP VALVE. R/U TBG COMPENSATOR. Printed 8/9/2011 10:16:59AM irth America -ALASKA- BP Page 5 of 7 Operation Summary Report Common Well Name:K-10 AFE No Event Type:COM-ONSHORE(CON) Start Date:7/5/2011 End Date:7/13/2011 X3-00XCJ-C(2,042,489.00) Project: Prudhoe Bay Site: PB K Pad Rig Name/No.: DOYON 25 Spud Date/Time:4/24/2001 12:00:00AM Rig Release: Rig Contractor: DOYON DRILLING INC. UWI:500292176200 Active Datum: K-10C @66.39ft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (ft) 07:00 - 12:00 5.00 RUNCOM P RUNCMP CONTINUE RIH WITH 4-1/2-IN,12.6 PPF, VAM-TOP TBG FROM 2,740'-MD TO 5,082'-MD. TRQ TURN EACH CONNECTION TO 4,440 FT-LBS. -PUW 107,SOW 102 12:00 - 13:00 1.00 RUNCOM P RUNCMP PERFORM MAINTENANCE ON CSG-SHED AND PIPE-SHED CONVEYORS. 13:00 - 21:00 8.00 RUNCOM P RUNCMP CONTINUE RIH WITH 4-1/2-IN,12.6 PPF, VAM-TOP TBG FROM 5,082'TO 10,029'-MD. -PUW 150K,SOW 120K RIH AND TAG UP ON DEPTH AT 10,112'-MD. TAG 41.49'-FT IN JNT-236. P/U 20'-FT,TURN STRING 180 DEG.SLACK OFF,VERIFY TAGGED DEPTH IS SAME AND CORRECT. 21:00 - 00:00 3.00 RUNCOM P RUNCMP UD TBG TO JNT 233.VERIFY WITH HALLIBURTON PACKER REP.AND DRILLER. JNT COUNT AND NEEDED SPACE OUT DISTANCE IS CORRECT.(OK) TOTAL NEEDED FOR SPACE OUT 37.92'-FT MAKE UP 3-PUPS TOTAL.7.81',9.82',19.61'. (TOTAL PUPS 37.24') RIH WITH JNT-234. M/U TCII LANDING JNT TO HANGER.DRAIN STACK,LAND HANGER. .23:11-RILDS. HANGER LANDED ON ORIGINAL MARK FROM DUMMY RUN. 7/10/2011 00:00 - 01:00 1.00 RUNCOM P RUNCMP CONTINUE TO R/U EQUIPMENT TO REVERSE-CIRCULATE. 01:00 - 04:00 3.00 RUNCOM P RUNCMP PJSM-PRESSURE TEST LINES 3,500-PSI. DISPLACE WITH 8.5-PPG BRINE.REVERSE CIRCULATE 171 BBLS 100 DEGREE 2%KCL, FOLLOWED BY 134 BBLS,100 DEGREE 2% KCL TREATED WITH CORROSION INHIBITOR AT 3-BPM,260-PSI FOLLOW WITH 165 BBLS OF 100 DEGREE 2%KCL DOWN THE IA AT 4-BPM,450-PSI.PUMP 5 BBLS DOWN TBG AFTER DISPLACEMENT TO CLEAN RHC PROFILE. 15 BBL LOSS DURING DISPLACEMENT. 04:00 - 06:30 2.50 RUNCOM P RUNCMP DROP BALL ROD TO RHC PLUG.PRESSURE UP TBG TO 3,500-PSI.SET PACKER. PRESSURE TEST TBG TO 250-PSI LOW, 3,500-PSI HIGH FOR 30 CHARTED MINUTES. BLEED OFF TBG TO 1,500-PSI.PRESSURE TEST ANNULUS AND PACKER TO 250-PSI LOW,3,500-PSI FOR 30 CHARTED MINUTES. BLEED IA TO ZERO. 6.5 BBL PUMPED,6.5-BBL RETURN WHEN BLED BACK. PRESSURE UP ON IA, SHEAR OPEN DCR VALVE AT 2,410-PSI. PUMP BOTH WAYS THROUGH SHEAR VALVE. PUMP DOWN TBG 1-BPM,50-PSI.PUMP DOWN IA 1-BPM,50-PSI.MONITOR WELL (STATIC) 06:30 - 07:30 1.00 RUNCOM P RUNCMP R/D CIRC. EQUIPMENT.B/D TOP DRIVE, CHOKE LINE, KILL LINE.PUMP OUT BOP STACK 07:30 - 08:00 0.50 RUNCOM P RUNCMP PJSM-SET TWC WITH CAMERON REP. Printed 8/9/2011 10:16:59AM )rth America -ALASKA- BP Page 6 of 7 Operation Summary Report Common Well Name:K-10 AFE No Event Type:COM-ONSHORE(CON) Start Date:7/5/2011 End Date: 7/13/2011 X3-00XCJ-C(2,042,489.00) Project. Prudhoe Bay Site:PB K Pad Rig Name/No.: DOYON 25 Spud Date/Time:4/24/2001 12:00:00AM Rig Release: Rig Contractor:DOYON DRILLING INC. UWI: 500292176200 Active Datum:K-10C @66.39ft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (ft) 08:00 - 12:00 4.00 RUNCOM P RUNCMP N/D BOPE, R/U ON HIGH PRESSURE RISER. OUT OF CRITICAL PATH.CLEAN PITS, INSTALL AGITATOR IN PIT-1,WELD SOCKET FOR CUTTING TANK AUGER. 12:00 - 16:30 4.50 RUNCOM P RUNCMP CONTINUE TO L/D 13-5/8-IN RISER TO BOP DECK. REMOVE 7-IN DRY-HOLE TREE FROM BOP DECK. 16:30 - 18:00 1.50 RUNCOM P RUNCMP INSTALL TBG HEAD ADAPTOR FLANGE.TEST ADAPTOR FLANGE TO 250-PSI LOW,AND 5,000-PSI HIGH WITH CAMERON REP. 18:00 - 19:30 1.50 RUNCOM P RUNCMP PJSM-N/U DRY-HOLE TREE. 19:30 - 22:00 2.50 RUNCOM P RUNCMP R/U TEST PUMP AND EQUIPMENT.FILL TREE WITH DIESEL. BRING DSM LUBRICATOR TO _ FLOOR. 22:00 - 00:00 2.00 RUNCOM N RREP RUNCMP TROUBLE-SHOOTING TEST PUMP AND C/O LEAKING HIGH PRESSURE VALVE ON TEST PUMP. 7/11/2011 00:00 - 01:30 1.50 RUNCOM N RREP RUNCMP TROUBLE-SHOOT AND REPAIR TEST PUMP. C/O HIGH PRESSURE VALVE. 01:30 - 06:30 5.00 WHSUR P RUNCMP PRESSURE TEST TREE WITH DIESEL TO 250-PSI LOW 5 CHARTED MINUTES.5,000-PSI HIGH. LOW PRESSURE TEST FOR 5 CHARTED MIN.HOLD HIGH PRESSURE 10-CHARTED MIN.TEST GOOD. INSTALL LUBRICATOR AND TEST TO 250-PSI LOW. 3,500-PSI HIGH FOR 5-CHARTED MINUTES. REMOVE TWC. 06:30 - 10:30 4.00 WHSUR P RUNCMP PJSM-R/U AND FREEZE PROTECT WELL WITH RIG INJECTION PUMP AND DIESEL HEATING SYSTEM.PUMP 152-BBL'S DIESEL DOWN ANNULUS. -1.2 BPM, IA 460-PSI,TBG 40-PSI. ALLOW DIESEL TO U-TUBE.SHUT IN TBG AND IA. FINAL PRESSURE PRIOR TO BLEEDING OFF IA 45-PSI,TBG 45-PSI 152 BBL PUMPED,152 BBL RETURNED. BLEED DOWN IA AND TBG TO ZERO. -SECOND NEGATIVE TEST MONITOR IA FOR 30-MIN.VERIFY STATIC WITH NO FLOW AND NO PRESSURE.(OK) BLOW DN LINES. 10:30 - 12:00 1.50 WHSUR P RUNCMP R/U LUBRICATOR AND TEST TO 250-PSI LOW. 3,500-PSI HIGH FOR 5 CHARTED MINUTES. SET BPV.TEST IA TO 250-PSI LOW.2,000-PSI HIGH.HOLD LOW TEST FOR 5-CHARTED MINUTES. HOLD HIGH PRESSURE TEST FOR 10-CHARTED MINUTES. TEST INNER IA WELLHEAD VALVE TO 500-PSI.5-CHARTED MINUTES. SECURE WELL AND INSTALL ALL NECESSARY WELLHEAD FITTINGS. B/D LINES. L/D DSM LUBRICATOR.CLEAR RIG FLOOR OF TEST PLUG AND TBG XO'S. WELL SECURE FOR RIG MAINTENANCE. r END OF WELL WORK 12:00-HRS. OAP 0-PSI Printed 8/9/2011 10:16:59AM )rth America -ALASKA- BP Page 7 of 7 Operation Summary Report Common Well Name:K-10 AFE No Event Type: COM-ONSHORE(CON) Start Date: 7/5/2011 End Date: 7/13/2011 X3-00XCJ-C(2,042,489.00) Project: Prudhoe Bay Site: PB K Pad Rig Name/No.: DOYON 25 Spud Date/Time:4/24/2001 12:00:00AM Rig Release: Rig Contractor: DOYON DRILLING INC. UWI: 500292176200 Active Datum: K-10C @66.39ft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (ft) 12:00 - 00:00 12.00 RIGD N RREP RUNCMP BEGIN RIG MAINTENANCE MODIFICATIONS ON FOLLOWING ITEMS -ADJUST TOP DRIVE HYD. PRESSURE. RE-ROUTE GAS BUSTER RETURN LINE TO SHAKER-2.INSTALL MANUAL PVT GAUGES TO PILL PITS. INSTALL WEATHER STRIPPING IN PIT TO SUB INTERCONNECT. INSTALL GUARDS TO ODS PIPE-SHED TUB SENSORS. CHECK AIR PRESSURE ON TIRES.CHECK TRQ ON LUG NUTS FOR MODULES. REMOVE CSG BAILS ON TOP DRIVE.C/O AND ADJUST KELLY HOSE. 7/12/2011 00:00 - 11:00 11.00 RIGD N RREP RUNCMP CONTINUE WITH RIG MAINTENANCE AND MODIFICATIONS.FIT TEST BRIDLE LINE PAD EYE SPREADER. PREP DERRICK TO SCOPE. PREP FLOOR AND BOPE LEVEL TO SKID AND LAY DERRICK OVER.R/D MUD-LINE, DIESEL, CMT, H2O AND VAC LINE.PREP CATTLE CHUTE TO SCOPE.SECURE DP AND CSG SHED TO MOVE. R/D MUD PUMPS, INSTALL MANUAL PVT IN PILL PIT#1 AND#2, INSTALL SOCKET FOR STABILIZER FOR LAY DOWN MACHINE. 11:00 - 12:00 1.00 RIGD N RREP RUNCMP PJSM,SCOPE DERRICK DOWN. 12:00 - 00:00 12.00 RIGD N RREP RUNCMP R/D DERRICK SCOPING LINES,CONT SECURING TOP DRIVE,CONT MODIFY CATTLE CHUTE AND RE-ROUTE GAS BUSTER RETURN LINE TO#2 SHAKER.PIN TOPDRIVE TO DERRICK,SECURE IDM,SECURE STABBING BOARD,SPOOL OFF 8.5 WRAPS ON DRAWWORKS DRUM.SECURE DERRICK BOARD,COMPLETE DERRICK INSPECTION, CONT INSTALLING MANUAL PVT IN PILL PIT #1 AND#2,CONT INSTALLING SOCKET FOR LAY DOWN MACHINE STABILIZER ON RIG FLOOR.PREP MOTOR SHED MODULE FOR MOVE. 7/13/2011 00:00 - 12:00 12.00 RIGD N RREP RUNCMP PJSM.MOVE CASING, POWER,PUMP,AND PIT COMPLEX MODULES OFF RIG MATS USING STOMPERS.STAGE RIG MATS FOR TRUCKS. PREP AND LOWER CATTLE CHUTE TO DRILLPIPE SHED, PREP FLOOR AND SKID FOR MOVE.CONTINUE WELDING KICK PLATES ON SMALL SECTION OF CATTLE CHUTE AND SOCKET FOR PIPE SKATE STABILIZER ON RIG FLOOR. 12:00 - 13:00 1.00 RIGD N RREP RUNCMP PJSM.SPOT CASING SHED ON PAD. 13:00 - 17:00 4.00 RIGD N RREP RUNCMP PJSM. INSTALL SPARE TIRES ON PIT AND POWER COMPLEX,SET PUMP COMPLEX ON GOUND. INSTALL LIFTING D-RING TO INSTALL SPARE TIRE ON POWER COMPLEX AND CONT WELDING ON LAYDOWN MACHINE STABILIZER ON RIG FLOOR.CONTINUE WELDING ON PIT TO SUB WEATHER STRIPPING. H7:00 - 19:00 2.00 RIGD N RREP RUNCMP RAISE C-SECTION WINDWALL. 19:00 - 23:00 4.00 RIGD N RREP RUNCMP PJSM.SECURE AND PREP DERRICK FOR LOWERING. LAY DOWN DERRICK. 23:00 - 00:00 1.00 RIGD N RREP RUNCMP HOLD AFTER ACTION REVIEW ON RAISING C-SECTION AND LOWERING DERRICK. Printed 8/9/2011 10:16:58AM K-10C RST (PTD#210-128) Page 1 of 3 Schwartz, Guy L (DOA) From: Rose, John G (ASRC) [John.G.Rose @bp.com] Sent: Friday, March 18, 2011 2:55 PM To: Schwartz, Guy L(DOA) Subject: RE: K-10C RST(PTD#210-128) Doyon 25 first well Got it and thanks for the clarification. -jr John G.Rose BP Staff Engineer Anchorage,AK rosel 1@bp.com 907/564-5271 Office 907/748-5223 Cell 907/243-8813 Home From: Schwartz, Guy L (DOA) [mailto:guy.schwartz @alaska.gov] Sent: Friday, March 18, 2011 2:31 PM To: Rose, John G (ASRC) Cc: Egbejimba, Uchenna J; DOA AOGCC Prudhoe Bay; AK, D&C Rig 25 Well Site Leader; Schultz, Mikel Subject: RE: K-10C RST(PTD #210-128) Doyon 25 first well John, As we discussed, the 7 day BOP test cycle intent is to get a track record for the rig established... it is not dependent on the type of drilling or operation occurring. Once the commission is satisfied that Doyon 25 meets expectations regarding BOP testing then it will fall to the standard default test schedule. I agree that the AOGCC inspectors may be able to see much of the rig before leaving Doyon's yard. I will pass that on to Jim Regg and the inspectors. Hope that clarifies your questions. Regards, Guy Schwartz Senior Petroleum Engineer AOGCC 793-1226 (office) 444-3433 (cell) From: Rose, John G (ASRC) [mailto:John.G.Rose @ bp.com] Sent: Friday, March 18, 2011 2:03 PM To: Schwartz, Guy L(DOA) Cc: Egbejimba, Uchenna J; DOA AOGCC Prudhoe Bay; AK, D&C Rig 25 Well Site Leader; Schultz, Mikel Subject: RE: K-10C RST(PTD #210-128) Doyon 25 first well Guy, 3/1,8/2011 f. K-10C RST(PTD#210-128) Page 2 of 3 As the K-10C well is a rotary sidetrack and just to be clear, please note the following points: 1. There will be no diverter used on this well. 2. We should be on a 7 day BOP test cycle until we complete the final P&A and decomplete work on the K-10B well (this is after we have set and tested the EZSV in the existing 9-5/8" casing at-3250' MD) and then on a 2 week BOP test cycle through the actual sidetrack work on the K-10C well. 3. By CC of this e-mail, the Doyon 25 Wellsite Leaders to give the Inspectors ample notice of the initial BOP test so that they can have a complete walk-through of the rig at that time. If you have any questions or concerns, please advise. Thanks -jr John G.Rose BP Staff Engineer Anchorage,AK rose11@bp.com 907/564-5271 Office 907/748-5223 Cell 907/243-8813 Home From: Schwartz, Guy L (DOA) [mailto:guy.schwartz @alaska.gov] Sent: Friday, March 18, 2011 11:30 AM To: Rose, John G (ASRC) Cc: Egbejimba, Uchenna J; DOA AOGCC Prudhoe Bay Subject: RE: K-10C RST(PTD #210-128) Doyon 25 first well John, According to my BP rig schedule this would be the first well drilled by Doyon 25. If so,the BOP test frequency will be 7 days instead of 2 weeks. The are no other PTD changes that would need to be addressed as we have the BOPE specs on file here. The Inspectors will also require a walkthrough when the rig is fully set before spudding the first well. Make sure they are notified well in advance to make arrangements. The diverter variance requested has been approved (dealing with the spacer pipe between annular and knife valve outlet). Regards, Guy Schwartz Senior Petroleum Engineer AOGCC 793-1226 (office) 444-3433 (cell) From: Rose, John G (ASRC) [mailto:John.G.Rose @bp.com] Sent: Friday, March 18, 2011 11:01 AM To: Schwartz, Guy L (DOA) Cc: Egbejimba, Uchenna J Subject: K-10C RST(PTD #210-128) Guy, The K-10C RST is now scheduled to be drilled by Doyon 25 (not D-141 as was the case when the PTD#210-128 3/18/2011 K-10C RST (PTD#210-128) Page 3 of 3 was issued) and we should be moving to the well with D-25 in the next 30 days. Please advise if additional information is required. Thanks for your help. -jr John G.Rose BP Staff Engineer Anchorage,AK rose11@bp.com 907/564-5271 Office 907/748-5223 Cell 907/243-8813 Home 3/18/2011 scifila [E DIF SEAN PARNELL,GOVERNOR ALASKA. OIL AND GAS 333 W.7th AVENUE,SUITE 100 CONSERVATION COMrIISSION ANCHORAGE,ALASKA 99501-3539 PHONE (907)279-1433 FAX (907)276-7542 John Egbejimba Engineering Team Leader BP Exploration (Alaska), Inc. P.O. Box 196612 Anchorage, AK 99519-6612 Re: Prudhoe Bay Field, Prudhoe Bay Oil Pool, PBU K-10C BP Exploration (Alaska), Inc. Permit No: 210-128 Surface Location: 2007' FNL, 4817' FEL, SEC. 04, T11N, R14E, UM Bottomhole Location: 553'FNL, 2719' FEL, SEC. 10, Ti 1N, R14E, UM Dear Mr. Egbejimba: Enclosed is the approved application for permit to re-drill the above referenced development well. In accordance with 20 AAC 25.005(f), all records, data and logs acquired for the pilot hole must be clearly differentiated in both name PBU K-10C PB 1 and API number (50- 029-21762-70) from records, data and logs acquired for well PBU K-10C. This permit to drill does not exempt you from obtaining additional permits or an approval required by law from other governmental agencies and does not authorize conducting drilling operations until all other required permits and approvals have been issued. In addition, the Commission reserves the right to withdraw the permit in the event it was erroneously issued. Operations must be conducted in accordance with AS 31.05 and Title 20, Chapter 25 of the Alaska Administrative Code unless the Commission specifically authorizes a variance. Failure to comply with an applicable provision of AS 31.05, Title 20, Chapter 25 of the Alaska Administrative Code, or a Commission order, or the terms and conditions of this permit may result in the revocation or suspension of the permit. Sincerely, Daniel T. Seamount, Jr. S Chair DATED this) day of September, 2010. cc: Department of Fish & Game, Habitat Section w/o encl. (via e-mail) Department of Environmental Conservation w/o encl. (via e-mail) ^ -1,.vAr'uI7l STATE OF ALASKA -� • ALASF )IL AND GAS CONSERVATION COMM!' )N „ II 2010 99'10 PERMIT TO DRILL 20 AAC 25.005 F ¶r�: ititiSSlol la.Type of work: lb.Proposed Well Class: ®Development Oil ❑Service-Winj ❑Single Zone lc. Specify if well is proposed for: ❑ Drill IN Redrill ❑ Stratigraphic Test ❑Development Gas ❑Service-Supply ❑Multiple Zone ❑Coalbed Gas ❑Gas Hydrates ❑ Re-Entry ❑ Exploratory ❑Service-WAG ❑Service-Disp ❑Shale Gas 2. Operator Name: 5.Bond: 0 Blanket ❑Single Well 11. Well Name and Number: ->F—p;to{ BP Exploration(Alaska)Inc. Bond No. 6194193 PBU K-10C /fozz 3. Address: 6. Proposed Depth: 12.Field/Pool(s): P.O. Box 196612,Anchorage,Alaska 99519-6612 MD 15001' TVD 8977' Prudhoe Bay Field/Prudhoe 4a. Location of Well(Governmental Section): 7. Property Designation(Lease Number): Bay Oil Pool Surface: ADL 028303 2007'FNL,4817'FEL, SEC.04,T11N, R14E, UM Top of Productive Horizon: 8. Land Use Permit: 13. Approximate Spud Date: 4948'FNL,560'FEL,SEC.04,T11N, R14E, UM October 10,2010 Total Depth: 9.Acres in Property: 14.Distance to Nearest Property: 553'FNL,2719'FEL,SEC. 10,T11N, R14E, UM 2560 11,200' 4b. Location of Well(State Base Plane Coordinates-NAD 27): 10.KB Elevation above MSL: 54.38 feet 15.Distance to Nearest Well Open Surface: x- 670732 y-5975196 Zone- ASP4 GL Elevation above MSL: 25.53 feet to Same Pool: 1,150' 16.Deviated Wells: Kickoff Depth: 3250 feet 17.Maximum Anticipated Pressures in psig(see 20 AAC 25.035) Maximum Hole Angle: 97 degrees Downhole: 3105 Surface: 2251 18. Casing Program: Specifications Top-Setting Depth-Bottom Quantity of Cement,c.f.or sacks Hole Casing Weight Grade Coupling Length MD TVD MD ND _ (including stage data) 8-1/2" , 7" 26# L-80 VT HC 7297' 3100' 3099' 10397' 8752' 197 cu ft Class'G' 6-1/8" _ 4-1/2" 12.6# , L-80 IBT-M , 4754' 10247' 8771' 15001' 8977' 668 cu ft Class'G' 19. PRESENT WELL CONDITION SUMMARY(To be completed for Redrill and Re-entry Operations) Total Depth MD(ft): Total Depth TVD(ft): Plugs(measured): Effective Depth MD(ft): Effective Depth ND(ft): Junk(measured): 11302 8763 None 11268 8761 None Casing Length Size Cement Volume MD ND Conductor/Structural 110' 20" 8 cu vds Concrete 110' 110' Surface 2694' 13-3/8" 1860 cu ft AS III. 1860 cu ft AS II 2694' 2694' , Intermediate Production 9479 9-5/8" 1973 Cu ft Class'G' 9479' 8639' Liner 403' 7" 345 cu ft Class'G' 9197'-9600' 8384'-8747' Liner 419' 3-1/2"x 2-7/8" 80 cu ft Class'G' 9200'-9619' 8387'-8765' Liner 2191' 2-3/8" 67 cu ft Class'G' 9111'- 11302' 8306'-8763' Perforation Depth MD(ft): None Perforation Depth ND(ft): None 20.Attachments: ❑ Property Plat IN BOP Sketch 0 Drilling Program ❑Time vs Depth Plot ❑Shallow Hazard Analysis ®Diverter Sketch ❑Seabed Report ®Drilling Fluid Program ®20 AAC 25.050 Requirements 21. Verbal Approval: Commission Representative: Date: 22. I hereby certify that the foregoing is true and correct. Contact Maria Medvedeva,564-5786 Printed Name John E•be'imba Title Engineering Team Leader Prepared By Name/Number Signature . / . - i Phone 564-5859 Date 7,// O Elizabeth Barker,564-4628 Commission Use Only Permit To Drill i/PI Number: Permit qA rov I4�te: See cover letter for Number: p?/Q,,, ?7 50-029-21762-04-00 _ -l tt l U other requirements Conditions of Approval: If box is ch ed,well not be used to explore for,test,or produce coalbed meth ne,gas hydrates,or gas contained shales: Er Other: 356v / SG (e S _ Samples Req'd: ❑ Yes H No Mud Log Req'd: ❑ es 14 No - - 5-616 /o S� A h.1 x.14,. /e s t- (m L I) H2S Measures: laYes ❑No Directional Survey Req'd: Yes ❑No - D,14j z� t�S �, i _Pis A-GGer f4.d4. (zJo /4/IC 2s.zr5-(h) "--- -" /2� APPROVED BY THE COMMISSION Date ,COMMISSIONER Form 10-401 Revised 07/2009 This permit is valid for 24 months from the date of approval(20 AAC 25.005(g)) Submit Duplicate OR ! GINAL - 7-,7/6 14l/to 0 To: Alaska Oil & Gas Conservation Commission, Chairperson From: Maria Medvedeva, ODE Date: September 3, 2010 Re: K-10C Sidetrack Permit to Drill The K-10C well is scheduled to be drilled by Doyon Rig 141 which is currently scheduled to move onto the location -10/10/10. The perforations were P&A'd and the , tubing was jet cut in January 2006 (Approved Sundry Permit Number 305-364). The sidetrack plan for the K-10C includes the following during pre-rig operations: lay in a 1000' cement plug in the tubing and the IA. During rig operations the 4-1/2" tubing will be pulled from the jet cut at approximately 4275' MD. The whipstock exit from the 9-5/8" casing is estimated at 3250' MD and will be milled using an 8-1/2" milling assembly. The 8-1/2" hole will be drilled to the top of the Sag River where a 7" drilling liner will be run and cemented with a 1,000' tail of 15.8 ppg class G cement. The production hole will be drilled with a 6-1/8" BHA initially penetrating through the Ivishak into the Kavik. An openhole sidetrack will then be performed in Zone 2 of the Ivishak and building to horizontal in Zone 1A. The well will then run horizontally through the Ivishak formation to TD at 15,001' MD. The liner will be a 4-1/2" L80 IBT-M solid, cemented and perforated liner and the tubing will be 4-1/2" 13Cr-85 Vam-Top, tied into the top of the production liner. Please note the following Well Summary as detailed on the next few pages: K-10C Permit to Drill Application Page 1 Planned Well Summary Well K-10C Type Producer Objective Ivishak Z1 A • Current Status ' - Estimated Start 1 O October 2010 Time to Complete: 31 Days Date: Surface Northing Easting Offsets TRS Location 5,975,196 670,732 3272' FSU 4818' FEL 11N, 14E, 4 Northing Easting Offsets TRS Target 5,972,355 675,064 332' FSU 560' FEL 11N, 14E, 4 Locations 5,971,756 677,558 4954' FSU 3361' FEL 11N, 14E, 10 Bottom Northing Easting Offsets TRS Location 5,971,544 678,206 4726' FSU 2719' FEL 11N, 14E, 10 Planned 3,250'MD / 3,246'TVDss Planned TD: 15,001'MD / 8,553' TVDss KOP: Rig: Doyon 141 BFE: 26.38' RTE: 54.38' Directional — Halliburton PB1 WP 3.0,WP 9.0 KOP: I 3250' MD Maximum Hole Angle: -56.9° in the 8-1/2" intermediate section (sail angle, @ csg point 34°) -96.7° in the 6-1/8" horizontal section Close Approach Wells: All wells pass major risk . Survey Program: MWD Standard + IFR+ Multi Station Nearest Property Line: 11200' (N) Nearest Well within Pool: 1150'to the 15-29B Contacts Name Phone# E-mail Drilling Engineer Maria Medvedeva 564-5786 Maria.Medvedeva @bp.com Geologist Doug Stoner 564-5652 Doug.Stoner @bp.com Pad Engineer Alice Kaminski 564-5676 A1ice.Kaminski @bp.com K-10C Permit to Drill Application Page 2 Formation Markers K-10C (Based on SOR) Commercial Hydrocarbon Est. Pore Est. Pore j Est. Formation Tops Uncertainty Bearing Press. Press. (PPS Formation (TVDss) (feet) (Yes/No) (Psi) EMW) NOTE:All formation tops are required from 1000'above proposed KOP to TD for sidetracks NOTE:All formation tops are required from surface to TD for all new wells SV5 -2916 No SV4 -3168 No SV3 -3664 No SV2 -3811 No SV1 -4198 No UG4 -4643 No UG3 -4882 No UG1 -5374 No WS2 -5967 No WS1 -6149 No CM3 -6362 No CM2 -7025 No CM l' -7335 No THRZ -7589 No BHRZ -7787 No LCU/TJD -7803 No TJC -7812 No TJB -7962 No TJA -8052 - No TSGR -8146 20 Yes TSHA -8187 20 Yes TSAD -8234 20 Yes TCGL -8337 20 Yes BCGL -8387 20 Yes 23SB -8432 20 Yes 22TS -8471 20 Yes 21TS -8520 20 fault -8557 20 Yes TZ1B -8591 20 Yes TDF -8634 20 Yes 3300 BSAD -8667 20 No K-10C Permit to Drill Application Page 3 Casing/Tubing Program Hole Csg/ Wt/Ft Grade Conn Burst Collapse Length Top Bottom Size Tbg O.D. (psi) (psi) MD/TVDrkb MD/TVDrkb 8-1/2" 7" 26.0# L-80 VT HC 7,240 5,410 7297 3100'/2000' 10397'/8233' 6 1/8" 4'/z" 12.6# L-80 IBT-M 8,430 7,500 4754 10247'/8110' 15001'/8607' Tubing 4'/" 12.6# 13-CR-85 VT 8,430 7,500 10247 Surface 10247'/8607' Mud Program Whipstock Milling Mud Properties: LSND I Whip Stock Window 9-5/8", 47# Density(ppg) PV YP API FL HTHP FL MBT _ PH 9.4 15-22 30-40 6- 8 N/C <10 9.0- 9.5 Intermediate Mud Properties: LSND/ I 8-1/2" hole section Depth Interval Density(ppg) PV YP API FL HTHP FL MBT PH 3250'—8466' 9.4—9.5 10- 18 18-28 <6.0 N/C <15 9.0-10 9500'- 10397' 10.5-10.6 12 -22 18-28 4.0-6.0 <10.0 <20 9.0-10 (HRZ/KNGK ) Production Mud Properties: FLOPRO SF Reservoir Drill-in Fluid 4 6-1/8" hole section Depth Interval Density(ppg) PV YP LSVR API Fl pH MBT 10397'-15001' 8.5—8.8 8- 12 22-28 >20,000 6.0-8.0 9.0-9.5 <3 Logging Program 8-1/2" Intermediate: Sample Catchers—as required by Wellsite Geologist Drilling: Dir/GR/Res/PWD Open Hole: None Cased Hole: None 6-1/8" Production: Sample Catchers—as required by Wellsite Geologist Drilling: Dir/GR/Res/Neu/Dens/PWD Open Hole: None Cased Hole: None Cement Program Casing Size: 7" 26#, L-80,VT HC Intermediate Liner Basis: Lead: None Tail: 1000'of open hole with 40%excess, plus 80' shoe track Tail TOC: 9397' MD (1000'above 7"shoe depth) Total Cement Spacer 25 bbls of Viscosified Spacer weighted to 11.0 ppg (Mud Push II) Volume: \ Lead N/A Tail 35 bbls, 194.7 cuft, 167.9 sks 15.8 lb/gal Class G +adds— 1.16 cuft/sk Temp BHST= 177° F, BHCT TBD by Schlumberger Casing Size 4.5" 12.6#, L-80, IBT-M Production Liner Basis: Lead: None K-10C Permit to Drill Application Page 4 Tail: Volume of open hole+40%excess+ 80'shoe track+ 150' 4-1/2"x 7" liner lap+200' of 7"x 4" DP excess. Tail TOC: 10,247' MD (Liner Top, excess will be circulated out) Total Cement Spacer 30 bbls of Viscosified, weighted Spacer(Mud Push II) Volume: Lead None Tail 119 bbls, 668 cuft, 576 sks 15.8 lb/gal Class G +adds—1.16 cuft/sk Temp BHST= 180° F, BHCT TBD by Schlumberger Surface and Anti-Collision Issues Surface Shut-in Wells: There are no wells requiring surface shut-in in order to move onto the well. At surface K-05 is 74.7'to the north and K-07 is 35.5'to the south. Close Approach Shut-in Wells: There are no close approach wells. All offset wells pass the major risk analysis. Hydrogen Sulfide K-pad is not designated as an H2S site. Recent H2S data from the pad is as follows: Well Name H2S Level Date of Reading #1 Closest SHL Well H2S Level K-07E 5 ppm 4/24/2010 #2 Closest SHL Well H2S Level K-05C 8 ppm 6/3/2010 #1 Closest BHL Well H2S Level 15-29B 10 ppm 4/24/2010 #2 Closest BHL Well H2S Level K-16AL1 14 ppm 2/5/2010 Max.Recorded H2S on Pad/Facility K-16AL1 25 ppm 1/13/2006 Other Relevant H2S Data K-Pad is not an H2S drillsite.Values are typically<25 ppm. (H2S alarms from rigs,etc.) Faults There is one anticipated fault crossing in the production interval. Fault#1 clearly offsets top of Shublik. Well trajectory will cross the fault from the upthrown to the downthrown fault block. There is a low potential for lost circulation. MD TVDss Throw Formation Where Encounter Fault Intersect Intersect Est.Throw Direction Uncertainty Fault#1 11226ft 8569 ft 40ft W-E 200 feet MD Well Control Well control equipment consisting of 5,000 psi working pressure pipe rams (2), blind/shear rams, and annular preventer will be installed and are capable of handling the maximum potential surface pressures. Based upon calculations below, BOP equipment will be tested to 3,500 psi. BOP regular test frequency for B-13B will be 14 days during drilling phase and 7 days during decompletion and surface casing work. BOPE and drilling fluid system schematics are on file with the AOGCC. K-10C Permit to Drill Application Page 5 Intermediate Interval Maximum anticipated BHP 3105 psi @ 8179'TVDss (7.3 ppg EMW) Maximum surface pressure 27251 psi (based upon pressure at TD -0.10 psi/ft gas gradient to surface) Kick tolerance 63.0 bbl with a 10.6 ppg mud and a 11.5 ppg FIT/LOT V(11.7 ppg FIT/LOT needed for ECD management) Planned BOP test pressure Rams test to 3,500 psi/250 psi. Annular test to 2,500 psi/250 psi 9-5/8" Casing Test/7" Liner 3500 psi surface pressure Integrity Test—8-1/2" hole FIT/LOT after drilling 20' from middle of window 7" Casing The VBRs will be changed to 7" rams to accommodate the 7" drilling liner Production Interval Maximum anticipated BHP 33Q0 psi @ 8553'TVDss (7.4 ppg EMW) Maximum surface pressure 2439 psi (based upon pressure at TD -0.10 psi/ft gas gradient to surface) Kick tolerance Infinite with a 8.7 ppg mud and 9.1 ppg FIT/LOT 7(10.6 ppg FIT/LOT needed for ECD management) Planned BOP test pressure Rams test to 3,500 psi/250 psi. Annular test to 2,500 psi/250 psi Integrity Test—6-1/8" hole FIT/LOT after drilling 20' of new hole Planned completion fluids 8.5 ppg Seawater/6.8 ppg Diesel Other Requests: Given rig floor height limitations,a MASP<3000 psi,and the fact that the three ram drilling BOP configuration is preferred to a two ram configuration with a spool, BPXA will execute the provisions of 20 AAC 25285(f)(1) regarding the initial testing of the BOPE as follows when existing wellhead or testing ✓ equipment prevents the testing of the lowest set of pipe rams:That lowest set of rams will be tested at the earliest opportunity during path-forward de-completion work,i.e.,after the completion has been pulled from the well. Safety concerns and spacing limitations with the wellhead height and tubing spool preclude us from installing a spacer spool in the three-ram drilling BOP stack. Disposal • No annular injection in this well. • Cuttings Handling: Cuttings generated from drilling operations will be hauled to grind and inject at DS-04. Any metal cuttings will be sent to the North Slope Borough. • Fluid Handling: Haul all drilling and completion fluids and other Class II wastes to DS-04 for injection. Haul all Class I waste to Pad 3 for disposal. K-10C Permit to Drill Application Page 6 Drilling Hazards and Contingencies POST THIS NOTICE IN THE DOGHOUSE I. Well Control A. The Ivishak in this fault block is expected to be under-pressured at 7.36 ppg EMW. This pressure is estimated based on offset well pressures. 3500 psi test pressure is in accordance with the RP for Prudhoe production well casing tests for producing wells. Interval PSI (EMW) MD(ft) TVDss (ft) Ivishak Z1 A 3300 (7.36) 15003 8614 B. Be aware of possible Cretaceous overpressure. Over-pressure from the produced water injection in the UGNU sands is expected. The maximum anticipated pressures are approximately 9.2 ppg. C. Tight hole, swabbing, and bridges, requiring normal working and/or washing and reaming occurred on most wells throughout B Pad. Most of these incidents were handled in routine operations. II. Lost Circulation/Breathing A. K-Pad is in the med risk zone for LC according to the WURD lost circulation study and the seismic data indicates that we may have one fault crossing in Z1A in the lateral part of the sidetrack (estimated throw of 40ft). III. Kick Tolerance/Integrity Testing A. With the planned 10.6 ppg mud weight, the kick tolerance for the intermediate section is 63.0 bbls. With the planned 8.7 ppg mud weight, the kick tolerance for the production section is infinite.The FIT/LOT will prove up adequate formation strength for expected ECD's. B. Integrity Testing Test Point Test Depth Test EMW (lb/gal) type 9-%" 20-ft minimum from the 9-%" LOT 11.5 minimum window window 7" shoe 20-ft minimum from the 7" shoe FIT 9.1 minimum IV. Hydrogen Sulfide K-pad is not designated as an H2S site. Recent H2S data from the pad is as follows: Well Name H2S Level Date of Reading #1 Closest SHL Well H2S Level K-07E 5 ppm 4/24/2010 #2 Closest SHL Well H2S Level K-05C 8 ppm 6/3/2010 #1 Closest BHL Well H2S Level 15-29B 10 ppm 4/24/2010 #2 Closest BHL Well H2S Level K-16AL1 14 ppm 2/5/2010 Max. Recorded H2S on Pad/Facility K-16AL1 25 ppm 1/13/2006 Other Relevant H2S Data K-Pad is not an H2S drillsite. Values are typically<25 ppm. (H2S alarms from rigs,etc.) K-10C Permit to Drill Application Page 7 V. Faults There is one anticipated fault crossing in the production interval. Fault#1 clearly offsets top of Shublik. Well trajectory will cross the fault from the upthrown to the downthrown fault block.There is a low potential for lost circulation. MD TVDss Throw Formation Where Encounter Fault Intersect Intersect Est.Throw Direction Uncertainty Fault#1 11226ft 8569 ft 40ft W-E 200 feet MD VI. Anti-Collision Issues A. All wells pass the major risk analysis. K-07 (K-07A, K-07APB1, K-07APB2, and K-07B) is the closest well with 72' ctr-ctr @ 3,253' MD. CONSULT THE K-PAD DATA SHEET AND THE WELL PLAN FOR ADDITIONAL INFORMATION K-10C Permit to Drill Application Page 8 K-10C- Drill and Complete Procedure Summary Current Well Status: 06/22/2005: MITOA Passed to 2000 psi 12/04/2005: PPPOT-T Passed to 5000 psi, IC passed to 3500 psi, LDS cycled 12/19/2005: MITIA Passed to 3000 psi 12/20/2005: P&A Perf's, Tagged TOC @ 9,085' SLM. 01/07/2006: Jet cut 4.5" tubing @ 4,275' MD 01/14/2006: CIRC-OUT to confirm jet cut, taking returns down the flowline 01/14/2006: CM1T-TxIA Passed to 3000 psi; MITOA Passed to 2000 psi. Freeze protect with 152 bbls diesel. 01/15/2006: Set 6" CIW BPV. 12/08/2007: CMIT-TxIA Passed to 2500 psi; MIT-OA Passed to 2000 psi 05/17/2010: CMIT-TxIA Passed to 2500; MIT-OA Passed to 2000 psi 06/18/2010: PPPOT-IC Passed to 3500 psi Pre-Riq Work: 1. S Drift to top of cement 2. EP Tubing punch 3. CP Lay in a cement plug in tubing and IA . 4. SP Tag TOC Riq Operations: 1. MI/RU Doyon 141. 2. Pull BPV. Circulate out freeze protection and displace well to seawater. Condition fluid as needed. 3. Set a TWC and test from below to 1000 psi and above to 3500 psi. 4. Nipple down tree. Nipple up and test BOPE to 3500 psi high/250 psi low. Pull TWC. 5. RU and pull the 4-1/2" 12.6#, L-80 tubing from the pre-rig jet cut at-4275' MD. 6. Test the lower set of pipe rams. 7. PU 4" drill pipe and 9-5/8" clean-out assembly and clean-out well to the top of the tubing stub -4275' MD. 8. RU E-line, RIH with CCL and 9-5/8" EZSV for 47# casing. Tag tubing stump at -4275'. Pull up to set the EZSV at -3270' MD as required to avoid cutting a casing collar while milling the window. POOH. Rig down E-line. 9. Pressure test the EZSV to 3500 psi for 10 minutes. 10. Change out the 9-5/8" pack-offs per Cameron. 11. PU and RIH with 9-5/8" Baker bottom-trip anchor whipstock assembly and 8.5" window milling assembly(to include full gauge string mills). e0 12. RIH to the top of the EZSV. Orient and set the whipstock. Shear off the whipstock. 13. Displace the well to LSND based milling fluid. Completely displace the well prior to beginning the milling operations. 14. Mill a window in the 9-5/8"casing at-3250' MD' plus 20' of formation from mid-window. PU into 9-5/8"casing. Perform a LOT. POOH for drilling BHA. • 15. MU an 8-1/2" drilling BHA with DIR/GR/RES/PWD and 2 ghost reamers behind the bit, to effectively {/� clean the entire wellbore upon short trip at TD. RIH. TAI, 5 16. Kick off and drill 8-1/2" intermediate interval to 7"casing point at the top of the Sag River. IrD NOTE: The mud will need to be weighted up with spike fluid. Plan for one weight-up with the spike fluid to 10.6 ppg while drilling 1-2 stands and allow for several circulations, prior to drilling the HRZ and Kingak shale. 17. Circulate well clean, short trip to bring the topmost ghost reamer to window, RIH to TD, circulate wellbore clean. POOH on elevators. K-10C Permit to Drill Application Page 9 18. Change to 7"casing rams and test to 250 psi low/3500 psi high. •/ 19. Run a 7", 26#, L-80, Vam-Top, HC drilling liner back into the 9-5/8" casing with minimum of 150' liner " lap. Cement 7" liner with a 1000'tail of 15.8 ppg class G cement. Displace cement with mud. • 20. Set hanger and liner top packer. Circulate bottoms up, POOH, L/D liner running tool (LRT). • 21. Pressure test the 7" liner for 3500 psi for 30 minutes. Chart and record. 22. MU a 6-1/8" BHA with DIR/GR/RES/DEN/NEU/PWD with an insert bit and RIH to the 7" landing collar. 23. Drill out the 7" shoe plus 20' of formation while swapping over to new Flo-Pro drilling fluid. Pull into the . shoe and perform an FIT. f'.1.1- 24. ()rill the 6-W production interval as per directional plan to TD of pilot axle, POOH for lateral section. H,LE P81 BHA and PDC bit. PU horizontal BHA 25. RIH to designated sidetrack spot and begin time drilling, trough sufficient footage to start sidetrack. Open hole sidetrack. 26. Drill ahead in production lateral to TD in Ivishak Z1 A. 27. CBU, trip to shoe and back to bottom, circulate until clean. MAD Pass where required. POOH. . 28. MU and RIH to bottom with a 4-1/2", 12.6#, L-80, IBT-M liner from TD to 150' liner lap inside the 7" shoe. 29. Cement the liner to the TOL with 15.8 ppg Class G Latex cement. 30. Set liner top packer and displace well to clean seawater above the liner top. a. A perf pill will be left in the 4-1/2" liner. 31. POOH, L/D LRT. 32. Pressure test casing and liner to 3,500 psi for 30 minutes. 33. RU DPC pert guns, RIH and perforate. Perf intervals to be supplied by asset. 34. RU and run 4-1/2", 12.6#, 13CR-85 Vam-Top completion, stinging into the 4-'h" liner tie back sleeve. 35. Space out and make up tubing hanger per FMC Rep. 36. Land the tubing hanger, and run in lock down screws. 37. Reverse circulate to seawater with Corrosion Inhibitor. - 38. Drop ball and rod. Set packer and individually test the tubing and annulus to 3,500 psi for 30 minutes. Record each test. 39. Set a TWC. 40. ND the BOPE. NU the tree and test to 5,000 psi. 41. Pull TWC. Reverse in sufficient volume of diesel to freeze protect the well to -2,200' TVD. Allow the diesel to U-tube to equilibrium. 42. Set a BPV. Secure the well. 43. RDMO. D. Post-Rio Work: 1. MI/RU slick line. Pull the ball and rod/RHC plug from landing nipple below the production packer. 2. Replace the DCK shear valve with a dummy GLV. 3. Install well house and instrumentation. 4. Hydrotest S-Riser. Modify S- Riser as needed. 5. ASRC flowback Drilling Engineer: Maria Medvedeva (907) 564-5786 Production Engineer: Alice Kaminski (907) 564-5676 Geologist: Doug Stoner (907) 564-5652 ATTACH: Current Schematic Pre-Rig Schematic Proposed Schematic K-10C Permit to Drill Application Page 10 TREE= 6"CIW - WELLHEAD= MCEVOY I(-1 0 B SAFE DIES: ACTUATOR= AXELSON w/ KB. ELEV= 54.30' BE ELEV= 26.38' KOP= 3200' Max Angle= 105 @ 9961' Datum MD= 9610' Datum TV D= 8700'SS 0 1967' H 4-1/2"CAMCO SSSVN, ID=3.813" 1 13-3/8"CSG, 72#, S95, BTRS, ID=12.347" —1 2694' Hi 4275' ( JET CUT(1-7-06) 1 IMI GAS LIFT MANDRELS ST MD TVD DEV TYPE V LV .LATCH'PORT DATE 4 3018 2945 6 LBD DMY T2 16 12/19/05 Minimum ID = 1.92" @ 9117' 3 6069 5657 35 LBD DMY T2 20 12/19/05 3-1/2" X 2-3/8" XO I I 2 8574 7787 25 LBD DMY RA 0 12/08/00 1 8997 8150 24 LBD D)NY RA 0 12/08,00 9067' 1�4 1?2" IN BKR L SLIDING SLV,ID=3313 1 TOP OF CEMENT(12/20/05) H 9112' li t..:10 9111' CT M H BKR'KB'LNR TOP PKR w/X PROFILE, ID=2.39" I o; , 9111' H3.625"BKR DEPLOY Man"SLV..13=30' I I '1114 k 9117' 1-13-1/2"X 2-3/8"XO, ID=1.92" I ,111 9135' H4-1 2"TUBING SEAL ASSY 1 ♦1• 1111 9151' H9-5/8"TVVHBBPPKR,ID=4750" 1 7"LNR HGR H 9197' 1 11 I.,•' I■ '.4 lb 9197' 1-14-1;2-OTIS X NIP,ID=3 813- I Behind R »•••, ' 9201' H3 75"BKR DEPLOY SLV,ID=3 Cr I 4-1/2"TBG, 12.6#,L-80, H 9270' 1 ••••••• '1 9210' —I TOP OF 3-1/2"LNR ID=2.992" I 0152 bpf, ID=3.958" 111• 9236' H4-1,Z/2"OTIS XN NIP,MILLED TO 3.80"lID I 11111 ••••■ 9271' H4-1/2"TM/TUBING TAIL, ID=3.58° I 9-5/8"CSG,47#, L-80, ID=8.681" H 9479' ►�1�1 /1/1� PERFORATION SUMMARY ►111• REF LOG:SWS GR/CCLCNL ON 06/27/01 111111' ANGLE AT TOP PERF: /1111 v �1111� Note:Refer to Production DB for historical perf data `�N1♦ MLLOUT WINDOW 9619'-tin??' SIZE SPF INTERVAL Opn/Sqz DATE 11••••111111, N11♦ 1-11/16" 4 10300- 11255 S 12/20/05 ������1 4.�1111111�' •♦ •••1 41111 o•�• i�••i 14�11111,1. •1111, ins �!: 2������ �1j111111v.1. IWO.* • ...4 `•1111 ivs is ♦••• X1111. k-(v :ice �•�••• �1�111111�1v iii! 14�11111�1 7"LNR,26#, L-80, ID=6.276" H 10134' •�•�•� •44'11111J...) 11268' PBTD ,•••• 111 I 1••• `1111... �111�� a `1��11111�:s. �1�1�� :4...,A.111i. 2-7/8"LNR,6.16#, L-80, .0058 bpf, ID=2.37"1 10525' • ....-4, `mm . K-lo 8 11300' H2-3/8"LNR,4.6#, L-80, .0036 bpf, ID=1.92" DATE REV BY COMMENTS DATE REV BY COMMENTS PRUDHOE BAY UNIT 11/19/87 INITIAL COMPLETION 09/25/05 TuVS/TLH PXX PLUG SET(06/20/05) WELL: K-108 05/18/01 CH/KAK P&A CTD SIDETRACK 12/31/05 /TLH R.UG PULLED(12/10/05) PERMIT No 1031450 06/28/01 CTD SIDETRACK(K-10A) 12/31/05 KSB/TLH GLV C/O(12/19/05) API No: 50-029-21762-02 12/08/03 TMN/KK CTD SIDETRACK(K-10B) 12/31/05 KEY/TLH P&A(12120/05) SEC 4,T11N, R14E, 200T SNL&462'EWL 01/02/04 DAV/KK GLV 0O 01/07/06 DFR/PJC JET CUT @4275' 03/28/04 JLG/KAK SET BKR KB LNR TOP P(R BP Exploration(Alaska) TREE= 6"CIW WELLHEAD=ACTUATOR= A ON K-1 v B Pre-Rig °� I KB.REV= 54.30' BF.ELEV= 26.38' KOP= 3200' Max Angle= 105 @ 9961' Datum MD= 9610' Datum ND= 8700'SS O 1967' H 4-1/2"CAMCO SSSV N. ID=3.813' I 13-3/8"CSG,72#, S95, BTRS, ID=12.347' H 2694' 4275' HJET cur(al/07/2006) I GAS LIFT MANDRELS ST MD ND DEV TYPE VLV LATCH PORT DATE 4 3018 2945 6 LBD DMY T2 16 12/19/05 TOP OF CEMENT(Pre-Rig) —` 8112' I 3 6069 5657 35 LBD DMY 12 20 12/19/05 2 8574 7787 25 LBD DMY RA 0 12/08/00 I I 1 8997 3150 24 LBO DAW RA 0 12/08/00 ,Tbg Punch 9108' TOP OF CEMENT(12/20/2005 9112' ►�*2.� 9067' H4-1/2-3102 L SLDNK'SLV,ID=3.813 I CI kt 9111' CTMHBKR'KB'LNR TOP PKRw/XPROFILE,ID=2.39" , Minimum ID = 1.92" @ 9117' I b*4• 9111' H3625"BKR DEPLOYMENT SLV,13=3.0" I 3-1/2" X 2-3/8" XO 1.4 , 9117' H3-1/2"x 2-3/8"xo,ID=1.92" I t ♦''' 9135' H4-1/2"TUBING SEAL ASSY I •T'LNR HGR 9197' `•�•� 9151' H9-503"TM!HE8P PKR 0=4.750' 1 j���� ��� 9197' 4-V2"OTIS X NI.0=3.813" I Behind • A ' 9201' H3.75'BKR DEPLOY SLV,0=3.0'" I I '�'•4 4-112"TBG, 12.6#, L-80, 9270' .1��4 '' 2'9210' HTOPOF 3-1 LNG 0=2-992' I .0152 bpf, ID=3.958" ,•�•∎ ••• 9236' H4-192'OTIS XN NP,11iLL®TO 3.80"0 I ,''' 9271' H4-1/2'TIIN TUBING TAIL_0=3.958" I 1 9-5/8"CSG,47#, L-80, ID=8.681" H 9479' 40 PERFORATION SUMMARY 4;' REF LOG:SWS GR/CCL/CNL ON 06/27/01 '00 ANGLE AT TOP FERF: I0• 0000, Note: Refer to Production DB for historical pert data 4`0.•'00• FALLOUT WINDOW 9619'-9622' SIZE SPF INTERVAL Opn/Sqz DATE ��0�0�0�0�0, 1-11/16" 4 10300- 11255 S 12/20/05 • 0 �40• �• API ••• ••••1 `....1. 'viii\ ,. •••••, A..***,4� viii• ••••i••/ •+***. viii •••1 �����. WO" •�•�•4• ‘� .••1••. •••• •••••� 7"LNR, 26#, L-80, ID=6.276" _I-1 ,+'�4It•��I�J 10134' .••••• A•••••■ 11268' PBTD � 2-7/8"LNR,6.16 4, L-80, .0058 bpf, ID=2.37'H 10525' 1•71� 4 sas.Noss• vile' 11300' H2-3/8"LNR,4.64,L-80,.0036 bpf, ID=1.92" DATE REV BY COMMENTS DATE REV BY COMMENTS PRUDHOE BAY UNIT 11/19/87 INITIAL COMPLETION 09/25/05 TNS/TLH PXX PLUG SET(06/20/05) WELL: K-10B 05/18/01 CH/KAK P&A CTD SIDETRACK 12/31/05 /TLH PLUG PULLED(12/10/05) PERMIT No: 2031450 06/28/01 CTD SIDETRACK(K-10A) 12/31/05 KSB/TLH GLV C/O(12/19/05) API No: 50-029-21762-02 12/08/03 TM WKK CTD SIDETRACK(K-10B) 12/31/05 KEY/TLH P&A(12/20/05) SEC 4,TI IN. R14E,2007'SNL&462'ENL 01/02/04 DAV/KK GLV C/O 01/07/06 DFR/PJC JET CUT @4275' 03/28/04 JLG/KAK SET BKR KB LNR TOP PKR 08/29/10 MLM Pre-Rig Schematic BP Exploration(Alaska) TREE= " 4-1/15 WELLHEAD=CA N K-1I Proposed [ °Ths: KR.asi= 54.38' BF.ELE A'= 26.38' KOi?= 3250' 1 1 ' 2200' H 4-1/2"HES X Nip, ID=3.813" I Max Angie= 96.66 @ 14463'' Datum.. _ ------------ GAS LIFT MANDRELS MD- 15000'' �, Dim TVD= 8553'SS - k ST MD ND DEV TYPE V LV LATCH PORT DATE 4 13-3/8"CSG, 72#,595, BTRS, ID 12.347" t—I 2694' YA6 , 3 2 9-5/8"x T'HKR ZXP P(R H 3100' . 9-5/8"x T'HKR Rexlock HGR 9-5/81'Baker Gen II Whipstock — 3250' ' 9-5/8"HES E2SV H 3270' ./&* 1 Minimum ID = 'Tubing Stuh H 4275' \ : ' 'I'. 1- r ITOCTBG& 8.- -tr 4 � i: IA --1 9397' H Intermediate TOC I 000' t i 10085' H 4-1/2"HES X Nip, ID 3.813" 1 T'x 4-1/2"HES TNT (R, ID=3.870" H 10120' ,-i 10155' H 4-1/2"HES X Nip, ID 3.813" I ;r' L. 10225' H 4-1/2"HES XN Nip, ID 3.725" I 14-11/2"113G, 112..6>tar.13CR-85,V am-Top H 10247 t El I 10247' H Baker 5"x 7"Hanger/LTP I IT' LNR,26#, L-80, VT HC, ID=6.276" -I 10397' , k I Like PERFORATION SUMMARY REF LOG: Llhc ir - 1 " — ANGLE AT TOP P�tF .• t1 " T Note:Refer to Production DB for historical perf data o j J _ SIZE SPF INTERVAL Opn/Sqz DATE C.+ 2.88" 6 2.88" 6 �"*"(Ir O: 14920' PBTD �i�i:i�i�i I4-1/2"LNR, 12.6#, L-80, IBT-M, ID=3.813" H 15001"' ��������� DATE REV BY . COMMENTS DATE i REV SY 1 COMMENTS PRUDHOE BAY UNIT 11/19/87 INITIAL COM PLETION 09/25/05 TWS/TLH PXX PLUG SET(06/20/05) WELL K 13C 05/13/111 , CHIKAK I P&A CID SIDETRACK 12/31/05 /TLH PLUG PULLED(12/10/05) PERMIT No: 06/26/01 i CTD SIDETRACK(K.10A) 12/31/05 I KSB/TLH'GL.V C/O(12/19105) API No: 12/08/013 VWN/KK i,CTD SIDETRACK(K 1013) 12/31/05 KEY/TL-1. P&A(12/20/05) SEC4,T11N, R14E, 200T SNL&462'EWL 01/02104 /IFJ;IGLU C/O 01/07/05 DFRZJFJC JET CUT @4275' 03/25/04 JILGtKAK SET BKRKBLNR TOP P(R 08/29/10' MLM! K-10C P-aposed BP Exploration (Alaska) C�'y3 i Ii c :f\ z z . _ - 15z E J 3' O NNZ b o N W Z O _1ir0i<Q N M I(7 t0 IN E g• .. R \ g O p 1.": y FE I i R1 O Q � I '� N .o.� m a r�° ,,,,,,to ,.....- .:_g Ff, N Yz� J' a lf - � • x 1 _IL741_ Y � Q t� Z _tivimin € M1 J m El 1 r. E j > Egg I § w 3$ It§ li 1Yi� ne �, \ ID L, i _:, i ! 3 a •!' MI III 1 �� _ a F * * \* o =7. • ■A-, . �, ,.; :fig Ii S BP - Alaska Prudhoe Bay PB K Pad K-10 Plan K-10C PB1 Pdo+ Note- Plan: K-10C PB1 WP 3.0 Standard Proposal Report 30 August, 2010 won A HALLIBURTDN mon A Sperry Drilling Services South(-)/North(+)(800 f/ii n) 8 8 8 0 O p8 8 o 00 O O V 7 I I I . I 1 I J I 1 I I I l , I II 1 i I I 1 1 I I I 1 1 1 1 I I I I I 1 1 1 1 1 I 1 1 I I I I I _ O A -O _ ^^ N co $2- M p j N f� a O —$ _ 88 00LL LL mn m 8 - N N (n9 QO W O F Y - (@-/) to O ^ N co 0.8Q_ 0 U y� ..-c0 U' 22 00 NNQ P.Np GD O m NO NO O A3 `G U)U 8 -----. 2 >NNNNt�IO_m723NO _ b E.010 AA Yd dd M - "I °-888 > O\ m ano �� E��� E--' .N. e o - o W W n W W oYYY _ M V 8887-n888188 —$ LL LL M a LLoO0o�oo�oo - z o 1-___U-1 - 5000 vi - d o z > co 4 "88888888888 - 0 o co a m a a a 0a6 IO 0 ° 0 a UC� a w m X3 on . a p ' OI —N£ Y " O 2/I`1 - 2 N 33 cc d 8.0 20 Oo M N I 1 �y Oiy Opl=Npp OY1 th - - U) 00 (n D C•. /� N 1 i Q ,„ Wt"43.88p1Oep1NWth J 00 A Q\ 1 J 1�^NOOd01 GNDO CO'f� 08p a �j -YYY rn 1 a +v . p l _8 ? H >O NN U O\ I I ''NNt7 Cl Mt7e ? - W N t o at_. I I• +0 Za^ 0 0.0000 N 1"' \ II I yA nn Nn�ronin\p u1 - _ I- cn O ,..,°)0 0 f0� Q 1 I eGe010fOOtOA�ON _ _ 0 Z 200 00' M 010 b \\ ■II I I W Z N NN NOOm ONN IoD OlI 7mnn0m Q ° 0 00 - Q 1�-' I I I I y 'NN NNNNN g 2~ ~ O4E N LL Op 000o w \ 1 I I - �O r @V' nOGGfC / O \ \ 1 II x' OfO.�tp 822-440 � o \■■ pp ]NtO rGppTnc�On+1mcOeeA - m N Q dLLLLj O dON f00 f+lnf i 0 \ \IZ8A 11 O ~Of010 3 rrSN - z ?i07MU c O'c��o > CO \ 1 1' •-- go go`"in�n'n�mmm`$8 W M E N F tti \ ■ 1 i 8 E it in Z U dC 1�+ \\ \\ 11 �Np�00SO0 A001A - O00 W 8• U'- M y \ 1 0101��CI fVHAOIA cr,�t�I W d C �'� \O W \\ \ NNNNf Nl00 A0101 - LL dew /�� N C \ \ _ �d�'L A O \ \\ _O — d z�n° p t < \ c51°m88�p8�pp8p8p<8<Wri _ ,'D\ N 0 d0 0� r - h \ ��N'f1N t7N1rznS - ^ z M N O\ \ — $— U ir m n Off\ \ F BOO Brv`nonnn MB°o _ o Si ill Q ci H o d' (N vo —4 3 c - N a\ A O o II II y 55�� m Q p a) —S J > (Z 4.1 9 - Q m L 00 (V AWL. I a vi N V M Q Q n O 0i � - O 2 'b m= n 2 o w a 0omcA _o Q OO J 4.1 0 n m J 7 - enel b.. a a m N o - F=, U o a c$ —$$ a ' m a 0 O DI c=N 0, M I . N°'- °' 9 o OYO cOO^ m - �. y ��c,�6 z Z a`aYaY �o — W 41'cv o o � r L m n Q E 3 i od O $ In ui cc, ��w� C1m o —o O rn lei O J N) tNO 0 C¢ �z � +C - N 088E8 -8 y813 2 m M O V) a o O t N'C y C.)O. '`� NZ f0 N 0 to Q Q Q 1 Q _ - ^aC C ° . 0 ir6 o m wmw m U - o I -.Z y _ I-o N M O O V 1 . a - O O 0 O 1 E O ?N N N M O Y i (ur/f;008)(+)8ioN/(-)4inos 0 O L _ CO C) 2 O 0 4 4 N ■O y m Z o of " u 11 �p O `0 v o cam) o ~ b 800 co in ? U c8m El x 10 0 06 co '1 0,,M2 ¢ E¢a_m o ad CO @)© CO >NZ� I^I II m EF� �m Lcr LT 715 0 mU �� U mp00I� J Qh 0I`Wa' —,0 F Y n Co U L-Nn.-0 N In N N 0O C cn O 00 CO!" FO-co 022 W r Q O y O U p O tD Nn NOD0 L-LO CO 001N IIj N ) 2' L Lr L - >vcorooCior.vL>;oo N. NN Q. i= o'- - ____. >- 0 �tn�f'q� '. nn6�m. O.-CYN01 wC01 a@.) R U Z ° �[aaa Z z c c m I°o loo coo°v°Oav m� ID 11.1 CO o � E U '; ¢ o `o m o c � 0 °0000room00 N mm d CD ^� > "c5oo m .i Li CO E _ 0 iY0000LDOOrnoo W lao tin Oa Ya E�• '';- rn I-O O Ot701�00 N O c o t0 C= o 0 YYY 0 0 To H CDN� co rD Z � co R0 aYo C� O } accc p U 000000000000 9 2n 0 �@ 1. a.0_ d C0000 iO o c0000000000o O co Z 0Nov0C000)ON 0 N 0 OvU1 FoCD O �' v Oeieied • _.-a m U o MM v G) G)c) > m maaa co - °° J 2NWOOOhL000L)C) 0. x o�N 44 0!+ y �a ce > ct= cn - Q ±ID e•)COC70-00 N 0)C) < >> J II II Iw O d co _ I- A a,N O )NO,OLO V 2 >O o 00 •1y 3 CO mom 0 W N�000)COOO C)e J N 00 O �+ O Tr p _0 N NC)C)C)C)0 J +O > O LNN U. O 1 O 7 m O O H II- co NaDrn mnntonln co LD 0 J OO p�J)) �'m O In.. - cO N- �h r F n0 oa)otDOron ION CO v co ZO0 e 4 I- �YYY M p o • Z<oco0 I.-00 L-CO CO 0,m +N N N L-CO 0 N N O U)O O J > y N C D n W LO C)COrr COCOa7 f �CO W O N^ Z J�� t N 0000 co O co N ' N N N N N N N to Z o W O C) U o CO $0 0 t 0 O 0 0 r 0 O F cD n O ,_ - 0 0,CO L-.-CO�LO CO C)000O IX +N CO H p O' pLOOLOO p O p >NCOCOO1 COOCOCO00r ¢ N ; 2 .NN Y r0 DON')Mpr' p r� HIO Ln OCOn Ci I•i00coo F- a. Y©� N O 000CO<DL-COC)nn ON _ E NNNN.-CO N NCO co co W O -W W'- E p F o a - Ch0,,.., Or r-co CO co co co 2• Of LL dIL W C 41 0c00000 0 > ' co z 5mm . p W000ld D 4 c NCOCO 000000 CO >c•) 0) .co 6 O LO Ch t- <NH L-00000 W W W J H c•, 01 CO N 8 y NCO 0 O �_ CO - 0 COOP W�.-NNN00)0) W 0 O CO U C C C� N�C)0O V p 1 .L-. d _O NN N000000)O)0) 3 CO ZO W N N N 0 3 n C d 0 0 CV 0.4.00000.9.000 r Q W d d N� CO N CO 11 O - cLnrnOmrnOOODwLn �o W Y Y x a d DD 1 y Y ,-`6 6 6 0 0 0 r r CO W .- N Ln Ln 0 t7 el Cr.n 0 W O.' W 6 o!a 2 p 12 -O 0 0000NC)00)co co co o + ?~O� N. 0 1 I Y ) 0 ooryronnrcono a�- no OO N.-cD 0000 r. O C V y U M II i I = L CO LO r CO U)CO 00)000)0 0 C. I O e,mcntnco N000.-.- F ' N •p 1 11 C U r O t 11 N 0•- co ICI ? O 0 to \ 1 1 1 CO ;r O O (n-NC•)OIa CO 1...-00,-� d U >> O OO\ t I/ 0 EeIi \ p ` 1 I I p _ to N co 7 M t0 co v \ I)i CO - z Y r 0 p`- ■ lL J. m rn \ 1 M m \ 1 m 000 ci to 2N>0N>OCo.-N C co N' N D Um Q 0 <JJ CO CO CO=m 0L 0 0) \ \ --_CO =03 N romm(nmxn077 UUmxx H 1-Ht-U(n m UU M N 7a N I-co o cO - E 0I-o0 F-1-1-HmNNN I- m 03 O O \co `H. J \ —N U t 5 N 0 \ •\ U)• -L 0\ C N \o f-..., 2 r CO CO 0 n 0 CO O C O W r O 2 N 0 0 000 0 N CO CO N CO O C N.N-0 CO 0 '\\. \ .. co CL O N N 0 0 co r•-> N N O O O C co 0 b 6 CO O C 006 CO 00 CO 0 0) ,- \ \ CO Z DrNr0Mr OONNCOOmCO O 0N �m \ 1 \ \\ \ -� C.) 0 2 N 0 0700 CO CO CO r Ir p CO 20181 aCO r 0C)00 000nCO0 -- - a \ \ 1 t \\ p- U 01 O - G Q \ t \\ \ apl) 1 t l 1 \\ \ \ ~) —go 1 f a cD 0 CD 00D CO CO CO CO CO CO CO OD CO 000000 CO CO COCOCO CO000 CO CO COCO V ct Ce CI CO 000 7h C C m 0C 0 el 00 C 0 C C CO h C)0e m C000 Y 1 l a \ \ \ 0 ONCOU)NrCO0t• CO W 0C, nCO0 COO-0,s-COLOO OCO' CO \ 1 I I \ `< I- W B N COOOO N yy 0D ,-N C C N) COr \ 1 I ! \ _ - >0 N NCOO OO COCODD N N N UUCOCO CO I 1 I- /-N co co co 000 CO CO CO COrrrrnr CO ODCO CO CO CO CO CO CO CO CO CO CO CO 1 I ) 1 1 \ Cl) 00 I V 1 \ 0 t I I ) , i_ ) Cr) \ IT I- t I I N \ - I- I I K m ~ o p I1 � m , H d o0 0 m I� U N U Oo_ • p> N Ce - a 0 ~ p ui o N Q _ co- d — 0 ED ro 2 \ \ • N 2 n ` - @� o a N LA \ N 2 N"Lo OD N Y .. ` U in Cnrlo.co • II OD _ W co ZOO _0 0 CO p \ 1 t- o Co O 0 —■ .7.6 ! r0 1 0 OI 1 Ur p 0000)- O O Cr,CO im • ,_,_.„c; V r —O NM O a a. r r 7 _\� TONO N O W NC)CO C (9 m a. 0 m 0_ O 001 V = C1 < Q Q ¢ m >CON NCO O al 0 0 ° 0 0 0 F NcoCOm—0 fn Y Y YY Y Y � a — _I N o p o 0 0 0 Y Y -J O L I _-r._. I .. I I I I I - 1 r I . - I Y I Y Y_Y - I I I. I N 4 : 0 0 0 0 0 0 o 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 = a CO N 0 c0 (V CO 0 0 CO N CO 0 0 CD N C) ('7 0 • m CO r r co a) C7) ® (ul/u 00n)4arao le0P9A anal Halliburton Company H A L L I B U R TO N Standard Proposal Report Database: .Sperry EDM.16 PRD Local Co-ordinate Reference: Well K-10 Company: BP-Alaska TVD Reference: BFE@26.38'+D141@28.00=54.38'@ 54.38ft(BI Project: Prudhoe Bay MD Reference: BFE @26.38'+0141 @28.00=54.38'@ 54.38ft(BI Site: PB K Pad North Reference: True Well: K-10 Survey Calculation Method: Minimum Curvature Wellbore: Plan K-10C PB1 Design: K-10C PB1 WP 3.0 Project Prudhoe Bay,North Slope,UNITED STATES Map System: US State Plane 1927(Exact solution) System Datum: Mean Sea Level Geo Datum: NAD 1927(NADCON CONUS) Using Well Reference Point Map Zone: Alaska Zone 04 Using geodetic scale factor Site PB K Pad,TR-11-14 Site Position: Northing: 5,973,161.33ft Latitude: 70°19'57.435 N From: Map Easting: 670,342.10ft Longitude: 148°37'5.24 W Position Uncertainty: 0.00 ft Slot Radius: 0" Grid Convergence: 1.30 ° Well K-10,K-10 Well Position +N/-S 0.00 ft Northing: 5,975,196.00 ft Latitude: 70°20'17.355 N +E/-W 0.00 ft Easting: 670,732.00 ft Longitude: 148°36'52.51 W Position Uncertainty 0.00 ft Wellhead Elevation: ft Ground Level: 0.00 ft Wellbore Plan K-10C PB1 Magnetics Model Name Sample Date Declination Dip Angle Field Strength (°) (°) (nT) BGGM2009 10/31/2010 22.01 80.97 57,710 Design K-10C PB1 WP 3.0 Audit Notes: Version: Phase: PLAN Tie On Depth: 3,250.00 Vertical Section: Depth From(TVD) +N/-S +E/-W Direction (ft) (ft) (ft) (°) 28.00 0.00 0.00 117.35 Plan Sections Measured Vertical TVD Dogleg Build Turn Depth Inclination Azimuth Depth System +NI-S +E/-W Rate Rate Rate Tool Face (ft) (1 (°) (ft) ft (ft) (ft) (°/100ft) (°/100ft) (°/100ft) (°) 3,250.00 11.54 298.54 3,246.26 3,191.88 26.78 -47.52 0.00 0.00 0.00 0.00 3,270.00 12.90 289.19 3,265.81 3,211.43 28.47 -51.39 12.00 6.83 -46.73 -60.00 3,582.20 25.00 279.12 3,560.61 3,506.23 50.47 -149.84 4.00 3.87 -3.23 -20.00 5,551.72 56.90 131.06 5,268.96 5,214.58 -517.93 102.30 4.00 1.62 -7.52 -153.14 8,936.03 56.90 131.06 7,117.31 7,062.93 -2,380.03 2,240.00 0.00 0.00 0.00 0.00 9,696.79 34.00 102.00 7,653.05 7,598.67 -2,639.67 2,699.17 4.00 -3.01 -3.82 -147.57 10,396.79 34.00 102.00 8,233.38 8,179.00 -2,721.06 3,082.05 0.00 0.00 0.00 0.00 10,446.79 34.00 102.00 8,274.83 8,220.45 -2,726.87 3,109.40 0.00 0.00 0.00 0.00 10,994.38 77.80 99.90 8,574.43 8,520.05 -2,808.75 3,544.20 8.00 8.00 -0.38 -2.96 11,297.38 77.80 99.90 8,638.46 8,584.08 -2,859.66 3,835.95 0.00 0.00 0.00 0.00 11,641.00 36.57 99.90 8,820.70 8,766.32 -2,908.25 4,114.33 12.00 -12.00 0.00 180.00 8/30/2010 3:32:55PM Page 2 COMPASS 2003.16 Build 71 Halliburton Company HALLIBURTON Standard Proposal Report Database: .Sperry EDM.16 PRD Local Co-ordinate Reference: Well K-10 Company: BP-Alaska ND Reference: BFE @26.38'+D141 @28.00=54.38'@ 54.38ft(BI Project: Prudhoe Bay MD Reference: BFE@26.38'+D141@28.00=54.38'@ 54.38ft(BI Site: PB K Pad North Reference: True Well: K-10 Survey Calculation Method: Minimum Curvature Wellbore: Plan K-10C PB1 Design: K-10C PB1 WP 3.0 Planned Survey Measured Vertical Map Map Depth Inclination Azimuth Depth TVDss +N/-S +E/-W Northing Easting DLS Vert Section (ft) (°) (°) (ft) ft (ft) (ft) (ft) (ft) -3,191.88 3,250.00 11.54 298.54 3,246.26 -3,191.88 26.78 -47.52 5,975,221.69 670,683.88 0.00 -54.51 KOP @ 3250'MD 3,251.00 11.60 298.02 3,247.24 -3,192.86 26.87 -47.70 5,975,221.78 670,683.71 12.00 -54.71 9 5/8" 3,270.00 12.90 289.19 3,265.81 -3,211.43 28.47 -51.39 5,975,223.29 670,679.98 12.00 -58.72 Start Dir 4°/100':3270'MD,3265.81'TVD:60°LT TF 3,300.00 14.04 287.50 3,294.98 -3,240.60 30.66 -58.02 5,975,225.33 670,673.30 4.00 -65.62 3,400.00 17.88 283.40 3,391.12 -3,336.74 37.87 -84.53 5,975,231.94 670,646.64 4.00 -92.48 3,500.00 21.77 280.72 3,485.17 -3,430.79 44.88 -117.70 5,975,238.19 670,613.32 4.00 -125.16 3,582.20 25.00 279.12 3,560.61 -3,506.23 50.47 -149.84 5,975,243.04 670,581.06 4.00 -156.27 3,600.00 24.37 278.34 3,576.78 -3,522.40 51.60 -157.18 5,975,244.00 670,573.69 4.00 -163.32 3,700.00 20.90 273.14 3,669.08 -3,614.70 55.57 -195.42 5,975,247.10 670,535.38 4.00 -199.10 3,752.47 19.16 269.72 3,718.38 -3,664.00 56.04 -213.38 5,975,247.16 670,517.42 4.00 -215.27 SV3 3,800.00 17.64 266.07 3,763.48 -3,709.10 55.51 -228.36 5,975,246.29 670,502.45 4.00 -228.33 3,900.00 14.75 256.13 3,859.52 -3,805.14 51.41 -255.85 5,975,241.57 670,475.07 4.00 -250.87 3,906.06 14.59 255.40 3,865.38 -3,811.00 51.04 -257.33 5,975,241.16 670,473.59 4.00 -252.02 SV2 4,000.00 12.46 242.09 3,956.73 -3,902.35 43.31 -277.75 5,975,232.97 670,453.36 4.00 -266.60 4,100.00 11.16 223.50 4,054.65 -4,000.27 31.23 -293.95 5,975,220.53 670,437.43 4.00 -275.44 4,200.00 11.21 202.78 4,152.79 -4,098.41 15.24 -304.38 5,975,204.31 670,427.37 4.00 -277.36 4,300.00 12.58 184.44 4,250.67 -4,196.29 -4.58 -308.99 5,975,184.38 670,423.22 4.00 -272.34 4,301.75 12.61 184.16 4,252.38 -4,198.00 -4.97 -309.02 5,975,184.00 670,423.20 4.00 -272.19 SV1 4,400.00 14.91 170.69 4,347.83 -4,293.45 -28.15 -307.75 5,975,160.85 670,424.99 4.00 -260.42 4,500.00 17.84 160.96 4,443.78 -4,389.40 -55.34 -300.67 5,975,133.83 670,432.69 4.00 -241.63 4,600.00 21.11 154.03 4,538.06 -4,483.68 -86.02 -287.78 5,975,103.46 670,446.27 4.00 -216.09 4,700.00 24.59 148.93 4,630.20 -4,575.82 -120.04 -269.15 5,975,069.87 670,465.67 4.00 -183.91 4,774.70 27.28 145.94 4,697.38 -4,643.00 -147.54 -251.54 5,975,042.78 670,483.90 4.00 -155.64 UG4 4,800.00 28.20 145.05 4,719.77 -4,665.39 -157.24 -244.87 5,975,033.23 670,490.79 4.00 -145.25 4,900.00 31.89 141.99 4,806.32 -4,751.94 -197.44 -215.05 5,974,993.73 670,521.51 4.00 -100.30 5,000.00 35.65 139.51 4,889.44 -4,835.06 -240.43 -179.84 5,974,951.55 670,557.69 4.00 -49.28 5,058.60 37.87 138.26 4,936.38 -4,882.00 -266.84 -156.78 5,974,925.68 670,581.35 4.00 -16.66 UG3 5,100.00 39.45 137.45 4,968.71 -4,914.33 -286.02 -139.42 5,974,906.90 670,599.14 4.00 7.57 5,200.00 43.28 135.69 5,043.75 -4,989.37 -333.97 -93.97 5,974,860.00 670,645.66 4.00 69.96 5,300.00 47.13 134.18 5,114.20 -5,059.82 -384.05 -43.73 5,974,811.08 670,697.03 4.00 137.60 5,400.00 51.00 132.84 5,179.71 -5,125.33 -436.03 11.07 5,974,760.36 670,752.99 4.00 210.16 5,500.00 54.88 131.63 5,239.96 -5,185.58 -489.64 70.16 5,974,708.11 670,813.28 4.00 287.27 5,551.72 56.90 131.06 5,268.96 -5,214.58 -517.93 102.30 5,974,680.57 670,846.06 4.00 328.82 End Dir:5551.72'MD,5268.96'ND 5,600.00 56.90 131.06 5,295.33 -5,240.95 -544.49 132.80 5,974,654.71 670,877.15 0.00 368.11 5,700.00 56.90 131.06 5,349.95 -5,295.57 -599.51 195.97 5,974,601.14 670,941.55 0.00 449.49 5,800.00 56.90 131.06 5,404.56 -5,350.18 -654.54 259.13 5,974,547.58 671,005.95 0.00 530.87 8/30/2010 3:32:55PM Page 3 COMPASS 2003.16 Build 71 Halliburton Company HALLI B U R TO N Standard Proposal Report Database: .Sperry EDM.16 PRD Local Co-ordinate Reference: Well K-10 Company: BP-Alaska ND Reference: BFE @26.38'+D141 @28.00=54.38'@ 54.38ft(BI Project: Prudhoe Bay MD Reference: BFE @26.38'+D141 @28.00=54.38'@ 54.38ft(BI Site: PB K Pad North Reference: True Well: K-10 Survey Calculation Method: Minimum Curvature Wellbore: Plan K-10C PB1 Design: K-10C PB1 WP 3.0 Planned Survey Measured Vertical Map Map Depth Inclination Azimuth Depth TVDss +N/-S +E/-W Northing Easting DLS Vert Section (ft) (°) (') (ft) ft (ft) (ft) (ft) (ft) -5,374.00 5,843.61 56.90 131.06 5,428.38 -5,374.00 -678.53 286.68 5,974,524.22 671,034.03 0.00 566.37 UG1 5,900.00 56.90 131.06 5,459.18 -5,404.80 -709.56 322.30 5,974,494.01 671,070.34 0.00 612.26 6,000.00 56.90 131.06 5,513.79 -5,459.41 -764.58 385.46 5,974,440.45 671,134.74 0.00 693.64 6,100.00 56.90 131.06 5,568.41 -5,514.03 -819.60 448.63 5,974,386.88 671,199.14 0.00 775.02 6,200.00 56.90 131.06 5,623.02 -5,568.64 -874.62 511.79 5,974,333.32 671,263.54 0.00 856.40 6,300.00 56.90 131.06 5,677.64 -5,623.26 -929.64 574.96 5,974,279.75 671,327.93 0.00 937.79 6,400.00 56.90 131.06 5,732.25 -5,677.87 -984.67 638.12 5,974,226.18 671,392.33 0.00 1,019.17 6,500.00 56.90 131.06 5,786.87 -5,732.49 -1,039.69 701.29 5,974,172.62 671,456.73 0.00 1,100.55 6,600.00 56.90 131.06 5,841.48 -5,787.10 -1,094.71 764.45 5,974,119.05 671,521.12 0.00 1,181.93 6,700.00 56.90 131.06 5,896.10 -5,841.72 -1,149.73 827.62 5,974,065.49 671,585.52 0.00 1,263.32 6,800.00 56.90 131.06 5,950.71 -5,896.33 -1,204.75 890.78 5,974,011.92 671,649.92 0.00 1,344.70 6,900.00 56.90 131.06 6,005.33 -5,950.95 -1,259.77 953.95 5,973,958.36 671,714.32 0.00 1,426.08 6,929.39 56.90 131.06 6,021.38 -5,967.00 -1,275.95 972.51 5,973,942.61 671,733.24 0.00 1,450.00 WS2 7,000.00 56.90 131.06 6,059.94 -6,005.56 -1,314.79 1,017.11 5,973,904.79 671,778.71 0.00 1,507.46 7,100.00 56.90 131.06 6,114.56 -6,060.18 -1,369.82 1,080.28 5,973,851.23 671,843.11 0.00 1,588.85 7,200.00 56.90 131.06 6,169.17 -6,114.79 -1,424.84 1,143.44 5,973,797.66 671,907.51 0.00 1,670.23 7,262.63 56.90 131.06 6,203.38 -6,149.00 -1,459.30 1,183.00 5,973,764.11 671,947.84 0.00 1,721.20 WS1 7,300.00 56.90 131.06 6,223.79 -6,169.41 -1,479.86 1,206.61 5,973,744.10 671,971.90 0.00 1,751.61 7,400.00 56.90 131.06 6,278.40 -6,224.02 -1,534.88 1,269.77 5,973,690.53 672,036.30 0.00 1,832.99 7,500.00 56.90 131.06 6,333.02 -6,278.64 -1,589.90 1,332.94 5,973,636.96 672,100.70 0.00 1,914.38 7,600.00 56.90 131.06 6,387.63 -6,333.25 -1,644.92 1,396.10 5,973,583.40 672,165.10 0.00 1,995.76 7,652.64 56.90 131.06 6,416.38 -6,362.00 -1,673.89 1,429.35 5,973,555.20 672,198.99 0.00 2,038.60 CM3 7,700.00 56.90 131.06 6,442.25 -6,387.87 -1,699.95 1,459.27 5,973,529.83 672,229.49 0.00 2,077.14 7,800.00 56.90 131.06 6,496.86 -6,442.48 -1,754.97 1,522.43 5,973,476.27 672,293.89 0.00 2,158.52 7,900.00 56.90 131.06 6,551.48 -6,497.10 -1,809.99 1,585.60 5,973,422.70 672,358.29 0.00 2,239.91 8,000.00 56.90 131.06 6,606.09 -6,551.71 -1,865.01 1,648.76 5,973,369.14 672,422.68 0.00 2,321.29 8,100.00 56.90 131.06 6,660.71 -6,606.33 -1,920.03 1,711.93 5,973,315.57 672,487.08 0.00 2,402.67 8,200.00 56.90 131.06 6,715.32 -6,660.94 -1,975.05 1,775.09 5,973,262.01 672,551.48 0.00 2,484.05 8,300.00 56.90 131.06 6,769.94 -6,715.56 -2,030.07 1,838.26 5,973,208.44 672,615.88 0.00 2,565.44 8,400.00 56.90 131.06 6,824.55 -6,770.17 -2,085.10 1,901.42 5,973,154.87 672,680.27 0.00 2,646.82 8,500.00 56.90 131.06 6,879.17 -6,824.79 -2,140.12 1,964.59 5,973,101.31 672,744.67 0.00 2,728.20 8,600.00 56.90 131.06 6,933.78 -6,879.40 -2,195.14 2,027.75 5,973,047.74 672,809.07 0.00 2,809.58 8,700.00 56.90 131.06 6,988.40 -6,934.02 -2,250.16 2,090.92 5,972,994.18 672,873.46 0.00 2,890.97 8,800.00 56.90 131.06 7,043.01 -6,988.63 -2,305.18 2,154.08 5,972,940.61 672,937.86 0.00 2,972.35 8,866.59 56.90 131.06 7,079.38 -7,025.00 -2,341.82 2,196.14 5,972,904.95 672,980.74 0.00 3,026.54 CM2 8,900.00 56.90 131.06 7,097.63 -7,043.25 -2,360.20 2,217.25 5,972,887.05 673,002.26 0.00 3,053.73 8,936.03 56.90 131.06 7,117.31 -7,062.93 -2,380.03 2,240.00 5,972,867.75 673,025.46 0.00 3,083.05 Start Dir 4°/100':8936.03'MD,7117.31TVD 9,000.00 54.75 129.38 7,153.24 -7,098.86 -2,414.20 2,280.40 5,972,834.50 673,066.63 4.00 3,134.64 9,100.00 51.44 126.57 7,213.29 -7,158.91 -2,463.42 2,343.39 5,972,786.74 673,130.71 4.00 3,213.20 8/30/2010 3:32:55PM Page 4 COMPASS 2100318 Bald 71 Halliburton Company HA LLI B U RTO N Standard Proposal Report Database: .Sperry EDM.16 PRD Local Co-ordinate Reference: Well K-10 Company: BP-Alaska ND Reference: BFE @26.38'+D141 @28.00=54.38'@ 54.38ft(BI Project: Prudhoe Bay MD Reference: BFE @26.38'+D141 @28.00=54.38'@ 54.38ft(BI Site: PB K Pad North Reference: True Well: K-10 Survey Calculation Method: Minimum Curvature Wellbore: Plan K-10C PB1 Design: K-10C PB1 WP 3.0 Planned Survey Measured Vertical Map Map Depth Inclination Azimuth Depth TVDss +N/-S +E/-W Northing Easting DLS Vert Section (ft) (°) (°) (ft) ft (ft) (ft) (ft) (ft) -7,223.43 9,200.00 48.20 123.48 7,277.81 -7,223.43 -2,507.30 2,405.91 5,972,744.30 673,194.21 4.00 3,288.88 9,300.00 45.06 120.08 7,346.48 -7,292.10 -2,545.62 2,467.65 5,972,707.40 673,256.80 4.00 3,361.33 9,359.79 43.23 117.87 7,389.38 -7,335.00 -2,565.80 2,504.07 5,972,688.05 673,293.67 4.00 3,402.95 CM1' 9,400.00 42.03 116.29 7,418.96 -7,364.58 -2,578.20 2,528.32 5,972,676.21 673,318.19 4.00 3,430.18 9,500.00 39.14 112.04 7,494.92 -7,440.54 -2,604.88 2,587.61 5,972,650.89 673,378.07 4.00 3,495.10 9,600.00 36.42 107.24 7,573.96 -7,519.58 -2,625.53 2,645.24 5,972,631.56 673,436.15 4.00 3,555.78 9,685.10 34.28 102.67 7,643.38 -7,589.00 -2,638.27 2,692.76 5,972,619.89 673,483.95 4.00 3,603.85 THRZ 9,696.79 34.00 102.00 7,653.05 -7,598.67 -2,639.67 2,699.17 5,972,618.64 673,490.39 4.00 3,610.18 End Dir:9696.79'MD,7653.05'ND 9,700.00 34.00 102.00 7,655.72 -7,601.34 -2,640.05 2,700.93 5,972,618.31 673,492.16 0.00 3,611.91 9,800.00 34.00 102.00 7,738.62 -7,684.24 -2,651.67 2,755.63 5,972,607.93 673,547.10 0.00 3,665.84 9,900.00 34.00 102.00 7,821.52 -7,767.14 -2,663.30 2,810.32 5,972,597.55 673,602.04 0.00 3,719.76 9,923.95 34.00 102.00 7,841.38 -7,787.00 -2,666.09 2,823.42 5,972,595.07 673,615.20 0.00 3,732.68 BHRZ 9,943.25 34.00 102.00 7,857.38 -7,803.00 -2,668.33 2,833.98 5,972,593.06 673,625.81 0.00 3,743.09 LCU/TJD 9,954.11 34.00 102.00 7,866.38 -7,812.00 -2,669.59 2,839.92 5,972,591.94 673,631.77 0.00 3,748.94 TJC 10,000.00 34.00 102.00 7,904.43 -7,850.05 -2,674.93 2,865.02 5,972,587.18 673,656.99 0.00 3,773.69 10,100.00 34.00 102.00 7,987.33 -7,932.95 -2,686.55 2,919.72 5,972,576.80 673,711.93 0.00 3,827.61 10,135.04 34.00 102.00 8,016.38 -7,962.00 -2,690.63 2,938.88 5,972,573.16 673,731.18 0.00 3,846.51 TJB 10,200.00 34.00 102.00 8,070.23 -8,015.85 -2,698.18 2,974.42 5,972,566.42 673,766.88 0.00 3,881.54 10,243.60 34.00 102.00 8,106.38 -8,052.00 -2,703.25 2,998.26 5,972,561.90 673,790.83 0.00 3,905.05 TJA 10,300.00 34.00 102.00 8,153.14 -8,098.76 -2,709.81 3,029.11 5,972,556.04 673,821.82 0.00 3,935.46 10,356.98 34.00 102.00 8,200.38 -8,146.00 -2,716.43 3,060.28 5,972,550.13 673,853.13 0.00 3,966.19 TSGR-7" 10,396.79 34.00 102.00 8,233.38 -8,179.00 -2,721.06 3,082.05 5,972,546.00 673,875.00 0.00 3,987.65 K-10C PB1 Tgt1 10,400.00 34.00 102.00 8,236.04 -8,181.66 -2,721.43 3,083.81 5,972,545.67 673,876.76 0.00 3,989.39 10,406.44 34.00 102.00 8,241.38 -8,187.00 -2,722.18 3,087.33 5,972,545.00 673,880.30 0.00 3,992.86 TSHA 10,446.79 34.00 102.00 8,274.83 -8,220.45 -2,726.87 3,109.40 5,972,540.81 673,902.47 0.00 4,014.62 Start Dir 8°/100':10446.79'MD,8274.83TVD 10,463.26 35.32 101.88 8,288.38 -8,234.00 -2,728.81 3,118.57 5,972,539.08 673,911.68 8.00 4,023.65 TSAD 10,500.00 38.25 101.64 8,317.80 -8,263.42 -2,733.29 3,140.10 5,972,535.09 673,933.31 8.00 4,044.83 10,599.45 46.21 101.13 8,391.38 -8,337.00 -2,746.46 3,205.58 5,972,523.42 673,999.06 8.00 4,109.04 TCGL 10,600.00 46.25 101.13 8,391.76 -8,337.38 -2,746.53 3,205.97 5,972,523.35 673,999.46 8.00 4,109.42 10,676.12 52.34 100.82 8,441.38 -8,387.00 -2,757.51 3,262.59 5,972,513.67 674,056.31 8.00 4,164.76 BCGL 10,700.00 54.25 100.74 8,455.65 -8,401.27 -2,761.09 3,281.40 5,972,510.52 674,075.19 8.00 4,183.11 8/30/2010 3.325514 Page 5 COMPASS 2003.16 Budd 71 Halliburton Company H A L L I B U R TO N Standard Proposal Report Database: .Sperry EDM.16 PRD Local Co-ordinate Reference: Well K-10 Company: BP-Alaska ND Reference: BFE @26.38'+0141 @28.00=54.38'@ 54.38ft(BI Project: Prudhoe Bay MD Reference: BFE @26.38'+D141 @28.00=54.38'@ 54.38ft(BI Site: PB K Pad North Reference: True Well: K-10 Survey Calculation Method: Minimum Curvature Wellbore: Plan K-10C PB1 Design: K-10C PB1 WP 3.0 Planned Survey Measured Vertical Map Map Depth Inclination Azimuth Depth TVDss +N/-S +E/-W Northing Easting DLS Vert Section (ft) (°) (°) (ft) ft (ft) (ft) (ft) (ft) -8,432.00 10,755.65 58.70 100.55 8,486.38 -8,432.00 -2,769.65 3,326.98 5,972,503.00 674,120.96 8.00 4,227.53 23SB 10,800.00 62.25 100.41 8,508.23 -8,453.85 -2,776.67 3,364.93 5,972,496.85 674,159.04 8.00 4,264.45 10,838.85 65.36 100.30 8,525.38 -8,471.00 -2,782.94 3,399.21 5,972,491.36 674,193.46 8.00 4,297.79 22TS 10,900.00 70.25 100.14 8,548.48 -8,494.10 -2,792.98 3,454.92 5,972,482.59 674,249.38 8.00 4,351.88 10,994.13 77.78 99.90 8,574.38 -8,520.00 -2,808.71 3,543.97 5,972,468.90 674,338.76 8.00 4,438.20 21 TS 10,994.38 77.80 99.90 8,574.43 -8,520.05 -2,808.75 3,544.20 5,972,468.86 674,338.99 7.85 4,438.43 End Dir:10994.38'MD,8574.43'ND 11,000.00 77.80 99.90 8,575.62 -8,521.24 -2,809.69 3,549.61 5,972,468.04 674,344.43 0.00 4,443.67 11,100.00 77.80 99.90 8,596.75 -8,542.37 -2,826.50 3,645.90 5,972,453.43 674,441.06 0.00 4,536.91 11,169.22 77.80 99.90 8,611.38 -8,557.00 -2,838.13 3,712.55 5,972,443.32 674,507.96 0.00 4,601.45 fault 11,200.00 77.80 99.90 8,617.88 -8,563.50 -2,843.30 3,742.19 5,972,438.83 674,537.70 0.00 4,630.16 11,297.38 77.80 99.90 8,638.46 -8,584.08 -2,859.66 3,835.95 5,972,424.60 674,631.81 0.00 4,720.96 Start Dir 12°/100':11297.38'MD,8638.46'TVD 11,300.00 77.49 99.90 8,639.02 -8,584.64 -2,860.10 3,838.47 5,972,424.22 674,634.34 12.02 4,723.40 11,326.12 74.35 99.90 8,645.38 -8,591.00 -2,864.46 3,863.43 5,972,420.43 674,659.39 12.00 4,747.57 TZ1 B 11,400.00 65.49 99.90 8,670.72 -8,616.34 -2,876.38 3,931.71 5,972,410.08 674,727.92 12.00 4,813.69 11,439.09 60.79 99.90 8,688.38 -8,634.00 -2,882.37 3,966.06 5,972,404.87 674,762.39 12.00 4,846.95 TDF 11,499.96 53.49 99.90 8,721.38 -8,667.00 -2,891.16 4,016.39 5,972,397.23 674,812.91 12.00 4,895.69 BSAD 11,500.00 53.49 99.90 8,721.41 -8,667.03 -2,891.16 4,016.42 5,972,397.22 674,812.94 12.00 4,895.73 11,600.00 41.49 99.90 8,788.86 -8,734.48 -2,903.81 4,088.90 5,972,386.23 674,885.68 12.00 4,965.92 11,639.99 36.69 99.90 8,819.89 -8,765.51 -2,908.15 4,113.73 5,972,382.46 674,910.60 12.00 4,989.96 6 1/8"OH 11,640.99 36.57 99.90 8,820.69 -8,766.31 -2,908.25 4,114.32 5,972,382.37 674,911.19 12.00 4,990.53 Total Depth:11641'MD,8820.7'ND 11,641.00 36.57 99.90 8,820.70 -8,766.32 -2,908.25 4,114.33 5,972,382.37 674,911.20 12.00 4,990.54 Targets Target Name Dip Angle Dip Dir. ND +NI-S +E/-W Northing Easting -Shape (°) (°) (ft) (ft) (ft) (ft) (ft) K-10C PB1 Tgt1 0.00 0.00 8,233.38 -2,721.06 3,082.05 5,972,546.00 673,875.00 -Circle(radius 125.00) 2,694.08 2,693.99 13 3/8" 13-3/8 17-1/2 3,251.00 3,247.24 9 5/8" 9-5/8 12-1/4 10,356.98 8,200.38 7" 7 8-1/2 11,639.99 8,819.89 6 1/8"OH 6-1/8 6-1/8 8/30/2010 3:32:55PM Page 6 COMPASS 2o03.16 Build 71 Halliburton Company H A L L I B U R TO N Standard Proposal Report Database: .Sperry EDM.16 PRD Local Co-ordinate Reference: Well K-10 Company: BP-Alaska TVD Reference: BFE @26.38'+D141 @28.00=54.38'@ 54.38ft(BI Project: Prudhoe Bay MD Reference: BFE @26.38'+D141 @28.00=54.38'@ 54.38ft(BI Site: PB K Pad North Reference: True Well: K-10 Survey Calculation Method: Minimum Curvature Wellbore: Plan K-10C PB1 Design: K-10C PB1 WP 3.0 Formations Measured Vertical Vertical Dip Depth Depth Depth SS Dip Direction (ft) (ft) ft Name Lithology (°) (') 9,359.79 7,389.38 CM1' 10,135.04 8,016.38 TJB 10,994.13 8,574.38 21TS 10,676.12 8,441.38 BCGL 11,326.12 8,645.38 TZ1B 10,838.85 8,525.38 22TS 11,169.22 8,611.38 fault 11,439.09 8,688.38 TDF 3,225.65 3,222.38 SV4 9,954.11 7,866.38 TJC 3,752.47 3,718.38 SV3 5,058.60 4,936.38 UG3 8,866.59 7,079.38 CM2 9,943.25 7,857.38 LCU/TJD 10,463.26 8,288.38 TSAD 10,599.45 8,391.38 TCGL 9,923.95 7,841.38 BHRZ 6,929.39 6,021.38 WS2 4,301.75 4,252.38 SV1 11,499.96 8,721.38 BSAD 3,906.06 3,865.38 SV2 7,652.64 6,416.38 CM3 10,755.65 8,486.38 23SB 7,262.63 6,203.38 WS1 10,243.60 8,106.38 TJA 2,970.70 2,970.38 SV5 10,406.44 8,241.38 TSHA 10,356.98 8,200.38 TSGR 9,685.10 7,643.38 THRZ 4,774.70 4,697.38 UG4 5,843.61 5,428.38 UG1 Plan Annotations Measured Vertical Local Coordinates Depth Depth +N/-S +E/-W (ft) (ft) (ft) (ft) Comment 3,250.00 3,246.26 26.78 -47.52 KOP @ 3250'MD 3,270.00 3,265.81 28.47 -51.39 Start Dir 4°/100':3270'MD,3265.81'TVD:60°LT TF 5,551.72 5,268.96 -517.93 102.30 End Dir:5551.72'MD,5268.96'TVD 8,936.03 7,117.31 -2,380.03 2,240.00 Start Dir 4°/100':8936.03'MD,7117.31'TVD 9,696.79 7,653.05 -2,639.67 2,699.17 End Dir:9696.79'MD,7653.05'TVD 10,446.79 8,274.83 -2,726.87 3,109.40 Start Dir 8°/100': 10446.79'MD,8274.83'TVD 10,994.38 8,574.43 -2,808.75 3,544.20 End Dir: 10994.38'MD,8574.43'TVD 11,297.38 8,638.46 -2,859.66 3,835.95 Start Dir 12°/100': 11297.38'MD,8638.46'TVD 11,640.99 8,820.69 -2,908.25 4,114.32 Total Depth: 11641'MD,8820.7'TVD 8/30/2010 3:32:55PA1 Page 7 COMPASS 2003.16 Build 71 0 N 0 dD M M C O iiiiii ea E'' V _ - aQ + d U.-Ncomi.NO/woom a7Nr..Nm.-mr..No m 0 0 s V1 N V ap tGap M Orim<ap C aJ to U t+m1 cm'1 "I O Of 0 V f�O)+ O L ' ^M M m M v V V V d 00)m V 0100 00 3& ° �Oy ` U Hoorn oNOO�ioo p I- _o �� m m 0 MO0)0000p00000 eL.f W 0 A 0 0 0 0 0 0 0 0 0 M 11V1114 G Do.=vaovddapd� y A U N W M M m M N m m;0 N �V\ _ Nf•f aOMONVNOV W o Z g g �vr > (n '''34NO (V DiOmV aN E0 .60 O \`M^ J WvNVOV�mO3M� ❑ 0 M co `_ Q '^NNMMMrmjV _I ,m ‘pp, i". W Nm1�i�NOINMNNOM II II JO O O r• N ❑ tOaDCI∎00i,-i�aD aoiDm > N La�p m{� d O +NNN 1n M�m�pp�1...WWM Vp . $ /}V� NNNN NNN N COfo z70�7 [�y W ❑Nmm W�NmMMmW a0 WNN V N DYO z -, -+ 2 ` (A 7tNOt°OtmD-0mrsisMN ,�� 4 ~�o�U L nmmm.ir�r,wwwmmm N W O § . a N E O O ?0 �V m N m m p O O pp O O ❑ m Y C M M N N...00OOOD Mas m mD��NNNOi Oioi Z LL LL N N M M o O O W W m 4 F G? S m N m Oo UV OO O 000000x0 C O W y y y y L C N m O W D! 0 m m N ^ m Y* Z L -0 -.NNNm MMr,i, r d d d ry C Z �� O O ❑OONNONNMO f� t OLL 0 CY K R'CO M N cd 0 0 04•-00 40,0��p�p�1,,- C WTh^er) ..N ^O = NNNNOMfmM000400 i o 3 >`0 U N C M M M N m O 0 m R a 9 0 , m O,- C V U d > m.NMVNmr,m M.-s- N ary' 2 m 20 Q 3 0 0 000000000000000 O +O U M 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 N O Y] O O N o N O N O N o N 0 M 0 N o O ,- .- N M M V V N N m tD n n co OD Cl DI o II I 1 I I I II 0 I ! 0 0 0 0 = 0 0 0 0 0 0 0 0 0 0 0 0 0 0 E 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 N 0 ■In 0 N 0 M 0 M 0 N 0 N 00 N O N 0 M V V N M ID ID N N m 00 01 0) 0 0 .- .- U- El d N 4 c fh� Nf ... 14Y 4Z. o3,- . ws-oiapr; Y = F c Zorn % O �11 _, C as c yY W i a �NNMO� M �gAA om)Ntm(N `\ __�tmDNNm .� ///(NMmm �\� U c3 d .6 c> aaa d _, a U U U 1l R N om N (� -eee w O • ee L� 0. tam c F a d $�e.i e.i E _ o X333 _ Y1 E ' O L ra'E u aUUU a Z u 7 'i t z m d o oM o g Q ;Q T.%m U E 0)U._ rn pq oeeDD3 1 E� i o,? • F q a W q U m'3O =vei$vD3 d' E� 2�F wd' > N E N O A E000=.o d z 2In2fn2 M e 7 e°e'>D L C O N i^N M Mvi O Z O O O C f0 l C N = to O W u _U Q (.) BP PASSPORT Anficollision Report Company: North America-ALASKA-BP Local Co-ordinate Reference: Well K-10 Project: Prudhoe Bay TVD Reference: BFE @26.38'+D141 @28.00=54.38'@ 54.38ft(BFE @21 Reference Site: PB K Pad MD Reference: BFE @26.38'+D141 @28.00=54.38'@ 54.38ft(BFE @2t Site Error: 0.00ft North Reference: True Reference Well: K-10 Survey Calculation Method: Minimum Curvature Well Error: 0.00ft Output errors are at 1.00 sigma Reference Wellbore Plan K-10C Pb1 Database: EDM.16-Anc Prod-WH24P Reference Design: K-10C Pb1 Wp 3.0 Offset TVD Reference: Offset Datum Reference K-10C Pb1 Wp 3.0 Filter type: GLOBAL FILTER APPLIED:All wellpaths within 200'+100/1000 of refer( Interpolation Method: MD Interval 25.00ft Error Model: ISCWSA Depth Range: 3,250.00 to 11,641.00ft Scan Method: Tray.Cylinder North Results Limited by: Maximum center-center distance of 1,361.30ft Error Surface: Elliptical Conic Survey Tool Program Date 8/27/2010 From To (ft) (ft) Survey(Wellbore) Tool Name Description 100.08 3,250.00 1 :Sperry-Sun BOSS gyro multi(K-10) BOSS-GYRO Sperry-Sun BOSS gyro multishot 3,250.00 3,600.00 K-10C Pb1 Wp 3.0(Plan K-10C Pb1) GYD-GC-SS Gyrodata gyro single shots 3,600.00 10,356.98 K-10C Pb1 Wp 3.0(Plan K-10C Pb1) MWD+IFR+MS MWD+IFR+Multi Station 10,356.98 11,641.00 K-10C Pb1 Wp 3.0(Plan K-10C Pb1) MWD+IFR+MS MWD+IFR+Multi Station 8/27/2010 1...34:32M1 Page 2 of 5 COMPASS 2003.16 Budd 71 BPPASSPORT Anticollision Report Company: North America-ALASKA-BP Local Co-ordinate Reference: Well K-10 Project: Prudhoe Bay TVD Reference: BFE @26.38'+D141 @28.00=54.38'@ 54.38ft(BFE@2I Reference Site: PB K Pad MD Reference: BFE @26.38'+D141 @28.00=54.38'@ 54.38ft(BFE @21 Site Error: 0.00ft North Reference: True Reference Well: K-10 Survey Calculation Method: Minimum Curvature Well Error: 0.00ft Output errors are at 1.00 sigma Reference Welibore Plan K-10C Pb1 Database: EDM.16-Anc Prod-WH24P Reference Design: K-10C Pb1 Wp 3.0 Offset TVD Reference: Offset Datum Summary Reference Offset Centre to No-Go Allowable Measured Measured Centre Distance Deviation Warning Site Name Depth Depth Distance (ft) from Plan Offset Well-Wellbore-Design (ft) (ft) (ft) (ft) PB DS 15 15-29-15-29B-15-29B 11,525.00 15,037.00 1,088.92 244.50 905.82 Pass-Major Risk PB K Pad K-05-K-05-K-05 3,275.37 3,500.00 825.18 68.33 760.23 Pass-Major Risk K-05-K-05A-K-05A 3,275.72 3,500.00 825.40 68.33 760.44 Pass-Major Risk K-05-K-05B-K-05B 3,276.56 3,500.00 825.92 68.56 760.74 Pass-Major Risk K-05-K-05B-Plan#10 3,276.56 3,500.00 825.92 68.12 761.18 Pass-Major Risk K-05-K-05BPB1 -K-05B wp08 3,276.56 3,500.00 825.92 68.29 761.00 Pass-Major Risk K-05-K-05BPB1 -K-05BPB1 3,276.56 3,500.00 825.92 68.36 760.94 Pass-Major Risk K-05-K-05C-K-05C 3,276.56 3,500.00 825.92 68.36 760.94 Pass-Major Risk K-06-K-06-K-06 3,260.35 3,300.00 146.35 50.24 96.97 Pass-Major Risk K-06-K-06A-K-06A 3,268.67 3,300.00 146.78 50.54 97.10 Pass-Major Risk K-06-K-06B-K-06B 3,268.67 3,300.00 146.78 50.54 97.10 Pass-Major Risk K-06_DIMS-K-06-K-06 Out of range K-06_DIMS-K-06-K-06 Out of range K-06_DIMS-K-06-K-06 Out of range K-07-K-07-K-07 3,253.23 3,275.00 71.95 47.22 24.88 Pass-Major Risk K-07-K-07A-K-07A 3,253.23 3,275.00 71.95 47.22 24.89 Pass-Major Risk K-07-K-07APB1 -K-07APB1 3,253.23 3,275.00 71.95 47.22 24.89 Pass-Major Risk K-07-K-07APB2-K-07APB2 3,253.23 3,275.00 71.95 47.22 24.89 Pass-Major Risk K-07-K-07B-K-07B 3,253.23 3,275.00 71.95 47.22 24.89 Pass-Major Risk K-07-K-07C-K-07C 3,260.67 3,275.00 73.77 47.33 26.59 Pass-Major Risk K-07-K-07D-K-07D 3,260.67 3,275.00 73.77 47.33 26.59 Pass-Major Risk K-07-K-07DPB1 -K-07DPB1 3,260.67 3,275.00 73.77 47.33 26.59 Pass-Major Risk K-07-K-07E-K-07E 3,260.67 3,275.00 73.77 47.33 26.59 Pass-Major Risk K-07-K-07EPB1 -K-07EPB1 3,260.67 3,275.00 73.77 47.33 26.59 Pass-Major Risk K-07_DIMS-K-07-K-07 5,710.82 5,975.00 231.93 167.79 64.15 Pass-Major Risk K-07_DIMS-K-07APB1 -K-07APB1 6,622.04 6,175.00 639.61 97.05 552.34 Pass-Major Risk K-07_DIMS-K-07EPB1 -K-07EPB1 5,706.39 5,950.00 230.75 166.80 64.11 Pass-Major Risk K-08-K-08-K-08 3,265.94 3,250.00 169.71 54.01 116.03 Pass-Major Risk K-08-K-08A-K-08A 3,265.94 3,250.00 169.71 54.01 116.03 Pass-Major Risk K-08-K-08A-Plan#3 3,265.94 3,250.00 169.71 54.01 116.03 Pass-Major Risk K-08-K-08B-K-08B 3,265.94 3,250.00 169.71 54.01 116.03 Pass-Major Risk K-08_DIMS-K-08-K-08 Out of range K-08_DIMS-K-08-K-08 Out of range K-08_DIMS-K-08B-K-08B Out of range K-09-K-09-K-09 3,272.68 3,300.00 230.61 48.32 182.71 Pass-Major Risk K-09-K-09A-K-09A 3,263.26 3,300.00 228.69 48.17 180.91 Pass-Major Risk K-09-K-09APB1 -K-09APB1 3,263.26 3,300.00 228.69 48.17 180.91 Pass-Major Risk K-09-K-09B-K-09B 3,275.30 3,300.00 231.24 48.35 183.30 Pass-Major Risk K-09-K-09BPB1 -K-09BPB1 3,275.30 3,300.00 231.24 48.35 183.30 Pass-Major Risk K-09-K-09C-K-09C 3,275.30 3,300.00 231.24 48.35 183.30 Pass-Major Risk K-09_DIMS-K-09-K-09 Out of range K-09_DIMS-K-09-K-09 Out of range K-09_DIMS-K-09-K-09 Out of range K-09_DIMS-K-09-K-09 Out of range K-09_DIMS-K-09A-K-09A Out of range K-10-K-10-K-10 3,275.06 3,275.00 0.62 1.73 -0.91 FAIL-Major Risk K-10-K-10A-K-10A 3,275.06 3,275.00 0.62 1.73 -0.91 FAIL-Major Risk K-10-K-10APB1 -K-10APB1 3,275.06 3,275.00 0.62 1.73 -0.91 FAIL-Major Risk K-10-K-10APB2-K-10APB2 3,275.06 3,275.00 0.62 1.73 -0.91 FAIL-Major Risk K-10-K-10APB3-K-10APB3 3,275.06 3,275.00 0.62 1.73 -0.91 FAIL-Major Risk K-10-K-10B-K-10B 3,275.06 3,275.00 0.62 1.73 -0.91 FAIL-Major Risk 8/27/2010 1:34:32PM Page 3 of 5 COMPASS 2003.16 Buid 71 BPPASSPORT Anticollision Report Company: North America-ALASKA-BP Local Co-ordinate Reference: Well K-10 Project: Prudhoe Bay ND Reference: BFE @26.38'+0141 @28.00=54.38'@ 54.38ft(BFE @21 Reference Site: PB K Pad MD Reference: BFE @26.38'+D141 @28.00=54.38'@ 54.38ft(BFE @21 Site Error: 0.00ft North Reference: True Reference Well: K-10 Survey Calculation Method: Minimum Curvature Well Error: 0.00ft Output errors are at 1.00 sigma Reference Wellbore Plan K-10C Pb1 Database: EDM.16-Anc Prod-WH24P Reference Design: K-10C Pb1 Wp 3.0 Offset ND Reference: Offset Datum Summary Reference Offset Centre to No-Go Allowable Measured Measured Centre Distance Deviation Warning Site Name Depth Depth Distance (ft) from Plan Offset Well-Wellbore-Design (ft) (ft) (ft) (ft) PB K Pad K-10-Plan K-10C-K-10C WP9.0 11,350.00 11,350.00 0.85 5.45 -4.20 FAIL-Major Risk K-10_DIMS-K-10-K-10 Out of range K-10_DIMS-K-10A-K-10A Out of range K-10_DIMS-K-10B-K-10B Out of range K-10_DIMS-K-10CXX-K-10CXX Out of range K-11 -K-11 -K-11 3,250.00 3,500.00 1,003.86 134.77 932.14 Pass-Major Risk K-11 -Plan 8,K-11A-Plan 8 3,250.00 3,500.00 1,003.86 134.49 932.43 Pass-Major Risk K-13-K-13-K-13 3,271.39 3,675.00 548.71 69.40 482.27 Pass-Major Risk K-16-K-16-K-16 7,439.01 6,850.00 276.34 164.13 135.56 Pass-Major Risk K-16-K-16A-K-16A 7,442.37 6,850.00 276.85 164.07 135.63 Pass-Major Risk K-16-K-16AL1 -K-16AL1 7,442.37 6,850.00 276.85 164.07 135.63 Pass-Major Risk K-16-K-16AL2-K-16AL2 7,442.37 6,850.00 276.85 164.07 135.60 Pass-Major Risk K-17-K-17B-K-317B 5,818.19 5,400.00 883.39 60.17 823.64 Pass-Major Risk K-17-K-176-Plan#126 5,818.19 5,400.00 883.39 59.93 823.87 Pass-Major Risk K-19-K-19-K-19 5,253.59 5,100.00 234.06 49.80 184.74 Pass-Major Risk K-19-K-19A-K-19A 5,240.31 5,075.00 233.90 49.68 184.65 Pass-Major Risk K-19-K-19AL1 -K-19AL1 5,240.31 5,075.00 233.90 49.68 184.65 Pass-Major Risk K-19_DIMS-K-19-K-19 Out of range K-19_DIMS-K-19A-K-19A Out of range K-19_DIMS-K-19AL1 -K-19AL1 Out of range K-20-K-20-K-20 6,350.46 6,000.00 179.75 88.24 110.80 Pass-Major Risk K-20-K-20A-K-20A 6,357.20 6,000.00 179.07 88.47 110.99 Pass-Major Risk K-20-K-20B-K-20B 6,357.20 6,000.00 179.07 88.47 110.99 Pass-Major Risk K-20-K-20B-Plan#14 6,357.20 6,000.00 179.07 88.14 111.31 Pass-Major Risk K-20-K-20C-K-20C 6,357.20 6,000.00 179.07 88.39 111.00 Pass-Major Risk K-20-K-20CPB1 -K-20CPB1 6,357.20 6,000.00 179.07 88.40 111.00 Pass-Major Risk K-20-K-20PB1 -K-20PB1 6,350.42 6,000.00 179.75 88.18 110.89 Pass-Major Risk 8/27!201'0 1:34 32PM Page 4 of 5 COMPASS 2003.16 Build 71 BPPASSPORT Anticollision Report Company: North America-ALASKA-BP Local Co-ordinate Reference: VVell K-10 Project: Prudhoe Bay TVD Reference: BFE @26.38'+D141 @28.00=54.38'@ 54.38ft(BFE @2( Reference Site: PB K Pad MD Reference: BFE @26.38'+D141 @28.00=54.38'@ 54.38ft(BFE @2( Site Error: O.00ft North Reference: True Reference Well: K-10 Survey Calculation Method: Minimum Curvature Well Error: 0.00ft Output errors are at 1.00 sigma Reference Wellbore Plan K-10C Pb1 Database: EDM 16-Anc Prod-WH24P Reference Design: K-10C Pb1 Wp 3.0 Offset TVD Reference: Offset Datum Reference Depths are relative to BFE @26.38'+D141 @28.00=54.38' Coordinates are relative to: K-10 Offset Depths are relative to Offset Datum Coordinate System is US State Plane 1927(Exact so ution),Alaska Zone 04 Central Meridian is 150' 0'0.000 W° Grid Convergence at Surface is: 1.30° Ladder I 1 I t 1400 I I I I I I I I I I. I I 4 • I f 1 I .? - - 1 F1{ I I I I I I `; I I I - i I r„} .c'. 'Ir -- i- -- - - -- - -- - - - -- I- --- -J- - I j• 1 b 1, I !� I I I 1 b.' ' I I i 11! • 4 1 1150 ` 4, I I t: , :a +!1 I I - I I s Na: ` ; I M ii. I I I I t- fb - 1 .! �� I I 1 :`1 �.1 �� 1 by I I I I r - I , 1 t H I "_' w l 1 , . I F.1•'-. I lilt - ' ti 7Ln] i 1 ,1, I O f -, I I I I I I I I -/••' ,. _ .ii., I R� I 1 I I -� �J• I I I L. 50 i ;:: 'Ala i►.. it a t I I . .?. I •r 1 ° I R -15-29;19-29815-298 b0-- J- p - F -043..K188 K-08103- - J- --- K-40-10MS;1<-198,1(-1-08+>10- - . -i- - I I 1 7 I K-05.K-05.K-05'4 I `'� K-OS,K108A,K-O8AV2 1 .. K-1010MS,K-10CXX,K-101CXX 4. I I A.r I I I I - K-05.K-45A.K-05AV5 1 r K-08,K1-D8A,PIan 13 V7 I - K-11,IK-11,K-11 V1 I e. ,•„ K-05.K-05B,K-05BV1 :: K-08.K-0813,K-0. 'v'2 K-11.•lan8.K-1 A,Plan 8'v0 - K-05.K-05 B,Plar rl 440 K-08_011,13,K-if/P,1438 co $(I(4- K-13,K-13,K11:0313 12OI]I] Zr-- K-05.K-05BPB1,K-05BIuol:3' 1 K-17'3(33136('H 171E1,81dti 000 ftlln} -.- K-16.K-16.K-16 V3 $ K-05.K-058PB1,K-0581391 V12 - K-08_0M8,K-08B.K-08BVO -9- K-16,K-16A.K-16AV1 -X- K-05.K-05 C.K-05 C V6 K-09,K-09,K-09Vt K-16.K-I6AL1.K-i6ALiV2 -4- K-06,K-06.K-06 V4 K:-09,K-09A.K-09AV1 K-16,K-16AL2,K-i6AL2 VO -- K-06.K-06A.K-O6AV1 K-09,K-09.APa1,K-09APB1V1 K-17.K-179.K-3179 V7 K-06,K-06B.K-068V2 -}- K-09,K-09B.K-099V2 K-17.K-17B,PlanD126V1 -6- K-06-OMS,K-06.K-06 VO K-09,K-09BPB1,K-095P51 V2 $ K-19.K-t9,K-t9V1 -4- K-06_DIMS,K-06.K-06''t K-09,K-09C.K-09 CV2 -6- K-19.K-19A,K-19A -xF K-06_DMS.K-06,K-06'.ii) K-09_DMS,K-09.K-09 VD -0- K-19.K-19A.L1,K-i9ALt V2 -e- K-07,K-07,K-07 V5 K-09_El MS.K-09.K-09 VO K-19_010 8.K-19.K-19'A -e- K-07.K-07A,K-07AV3 K-09_0MS.K-09,K-094O -e- K-19_DMS,K-19A,K-19AVO -._ K-07.K-07APB 1,K-07AP B 1 V3 --. K-09_0 tut S.K-09,K-09 V0 -9- K-19_0MS.K-19AL1,K-19AL1 vi) -- Ic-07.r.-07iiP82,R-u:AP D2vQ -"kJ- '-Or;_OMa,rs-O SA,K-09AVD 8/27/2010 1:34:32PM Page 5 of 5 COMPASS 2003.16 Build 71 ---- . ...- __-- - ____--_ -p_satzw,..,t.s.S:313 .1%., . . . . . • ..._ ____ ..s=34ut-222.7R7,3 ,c•-?,-.e▪,. -. . •-. 53AA3',V-4-4 ..:,,...“..,.., - 0 7- c•-• ,, 4;,: ...;.--?.ZZ 0 \ 1 .-03.:DriZi / - - . ?St 333333338 0 -' ‘• - da,t-i-gici•idcisi..2,-,..4 I - - , • • / 0 ..,,--;-__ _ , 2.1 •' i 0 , a 291:328411114XIG: . / 4 i 4, -. • , ■ i w , - T - - '6,•:••si.ii- aci4 .!' 1 ggi'.7,aiARI a •• ,.,Y.ciaL , .., . . , - Lil Ir.' '-iZ•=•=.7. • ' • I E____,, / 4 '.'. i.•--, li§1:1=4-..i 4 ' '- ”.3 ..,............. 0= '' ..?... - -:'-' '' ')/ / 1 Z‘;■'-'1!$888,7,:iis' i g.e-t12-1 0 ..nols, 130=Vjgg331 ,,■ . I— CL 0- /, ea ea ' --- ,--- ,/ji g "'S ',"3333238844.7i , .'/7. 3,- 388?4-1.1..•4531st$ , g2.talttlir': . .r.;.-;,...-: --laanammioa. - .. ., qw4383-'333. 2 •!:./ ..t,,Z.,Z ,-.., .11 n-■en. - ,....,,,,,,■.00r.. .: -' .,...7 .. r-... , 0,!. ..;•--,i•Ctc▪•-• '2 111.13.!ii,P:alaut., 3 i R ; 4 E.? ' .:3:37.3:4',3:itg2:1:3:2'da'aagla 2x4vam3m,..r.m3317=: v 2 a 3 2 -ir Ul E i A z* g,;;:•,,- 4 4 a g. .:: =:... ,J. .2 . . . . •- 2 :2 2 4;',f r! !;c. i. i. 3 7 0 i In 2 2. •- „if...-...._.,...,,,:.%..... ■ a ta'A i? a a ri , oilP, . ... ,. ' 1 ii52 0 0 .3 1 ii• '1. ':''-.2'-'I''t, i 2 •:, . ...,erar . .,./11,,,• .....z.....tik,..1114),111..:,.... Iti, aA:r4 :3 3 : I; . ... 1.".••I a,..r 1 i . .........3,.4' Al"?,1,7jr,i;0!I',i".....?,t4.'■ . ■%,111.1.11r, "6. •••/.11■- -2'...,"......%"•:I.,1_,, ,ip.1(00,22:_s_6.1• .7.-2s _, t 2 4i.„...-:i "1!;,;••■...,./11, -,es,:.--,•,...,.,4 — -0-7A,4,--4-11111S4''' ,::.i522 '# war :-aiers1 49 ---,:;),Alb'.-,....._; c..0741r;9,if:irof ri B x_.-..... .7_,....4 r:- -...,, ---- . . .,..-74.--..- i . ...0.- l•Clva a l.. aititl..IF '1;17.1:letidrear,.....e.. ...740r_IALf.■.:...,...i Iff -1,4,:), ...i.,..._,:, .. 4, ••■•■••_., ......... ..„._.., - , 014' I ' •,, 1 1 gi.-'■11 '" 12` 4" 11 •.,I.Iwo/0s, —...*..._alf . ...41. ) -,• .... 1 i 4/ g '.1.sn Ilt —M•4,i !lira/ „;•,--71: ' ::1 4111 '-' i."-5,..%•OVA 'i.j'A""4,%11■ `4„, - ..4"- V‘, ;,t4r1", "_..ii.7 atit• ,VINgeoll■ i 31229 -4-,■■ •s. .4;- . 1 /-....**•:ti..., 0 •-1,41011,_..%'• ,- irl"), -'11104 IA 01/. ' ----- -. ..,..2'44,,.."4,' \Ati '•; i '8,-7100.,_ Itior \ 44::-.; co,,,gs■ 1„,,, 05,A • --......., .. 1 :"^-. 0- 1- ■-"' , airi3.., I 441 A I •,. a 1 i I . -.S7147.=••.,■-;.V■S. , ..... .. .■ , i --..... ,,,. :-.-...- ....`•,,,,I'v-,4?, VII . ,,/z/ ,- . et;;;%----■04•Zo"`'. VII: . ., 4 ■ ' 5 : 1 . •1 x J ----- -=- 4-.se :%.'.+1`,i. ,... -. -rtio. _40_4, ■,, i = :.a..... ..-.-.,"".,.&&..•-r-oil,.-.-4-,.-4*4,'',.:'q - L -it a\ I 31 - ,•,.1 ....-!...4.,.,. . '.2... rtvi yr / (CI ,=,.-_-1- ■1/1111■:_11',„....00,,,.„ ;:,!. 1 r ' ■L- 2 01,.....:4 iik■fefri,„-'3--- -Iro''',00;'4: i / / . , — .,......,_ ........... . .....Ae>,,,,10 ' (.' '- ' ' 0 I' E' el • 0 .,..3 74--gx 11..t.iii.z■l ...t0S,W440 i ' - riC —co — a g --.. ..----,--.-..0 .-11. E = ,,..1-,-. .•■•_,..........k.N.•,, , . ,...'''' N4,, _. "1 C = 4::;1•E'-'. - '- ';‘1 e14 CU !!', o■Na goil, ,,,■,k,. -----;_,-.. -- */ ///// : / ' . -''• - i 1 , 3 ° (13 -. .-..u2...=• -- IO* ---• l• , /. .... .--, -- .-. i, A a .11....,-1146. .,..ft‘‘,..• ,,,,..' 4 li • I= =ifs , . ..-r 4W116.16-41■10 a'■'t --------i-1-- —.--:::"-- 0. , J. co ce) = 12 m.,, ----__ _--- „ .., i ....,.. , , 7.5..i.,T, - 4 . 1111;■7404 AV,i, illtAtit. -----+ . fr....- .. ;7 a ..6-6 14 a it#41.1r E k = I; 11ANglAiiilipli4141114111 . —- 2 ....-- 0:1 -.2 m ‘ •Op --_ I __ --- --- I - i U .v, R!. • x— II1 -.-----, y.. Y i P , M ,I,t • :p k t [7 k BP - Alaska , Prudhoe Bay _ PB K Pad K-10 Plan K-10C - 1 ()-;(5-v . 2o- Plan: K-10C WP9.0 rot` '4°1.t Standard Proposal Report 24 August, 2010 t. d ,4 j II ,., I - HALLIBURTON 1. Sperry Drilling Services South(-)/North(+)(1000 ft/in) o o Oo 0 8 $ $ 8 „o°, $ ° g R ° - O 8 O N N t+f M II TTTiii I I i I i i I 1 I I I I 1 I I 1 I I J I_ 1 1 _I I I I I I I I I ( I I I I I I I I I I I I I 1 1 1 L I i i I I I I I 1 1 I I V o O c0-,ccl -0O O' o '^ b c c II 11 A ri -.. town• c. - 10 0000000 'oar A - 00 v tJ >tq*m+a.*a Naaaaaaa �� Ll s-� �o 69+++ r o 8— 00000008 vv o0 0` 4¢9; I,: r� mOppp _o c0000000 so ) �p>333 N NcOAWao311 �0 a oo o. O lO-mc9�s� - C ---- ------ -- -r w c°DnmvlN.colOnv mm A '0 d o --- / o 1.00I.10I.f. _ NNCm aaNCm co NN A 7 00 S / �/ 0 �g E-' A ^ / /, Y,d a s o g _ w IWiLL 7 O�j - % % aU�U o 1- 0000000 mm 00 V7 N = -- EYYY'� o _ < 0,0000000 M N a. / % s e- 0 U Z $ aioococ 464- aooao d ON N > 2 �m m cco r 0,NrNN o = - o -0,—NIN.INI �� •moo o`oo A % / s :; aq 0)20.2'- aaaY O U Z rnrn0,0,0,0,0, '!i�'!� Q = A " is / 's I C7 mNOOO� - v•o N N N N I0 N N ig© N OO,ONmN f+f M M M O C. / / . c..) Y > j 0 ��. - f �ov, n nvN 0000 v o -. W / / ey > rn aaa3 _ii o en woomamma oOOO loo t` N o / -' K d aUUUU o -, +OMOIi.MN0 00 CD M / 0 Y 00000_ to N.c.)t0 N 4 cn a0� O0 (o W €'UCH Q AN.. 1�' A / %/ O 0 0.-YYYY- W mpp 0.00 o O .p / ''�' Ti £000001 0 - 0 Noarn,m°oi O_ FJap.J. F' \p e! Gi � 0.00 oprnolo �— ch t+i O M e '- / p10no uN110000 v F- Z n�i m.el co ~ _co com � Tr ' / % O0 ErNim V).-8 '., +Nc0'�)NM i?NN YUU2 v -' .-" A '\ y> 8 L b - 0 0 %LLLL C 1 F O LL 00000fO - m paoaomaoaoaom ? 3mmU 00 0 1 / r- o .O000lf0ilOn - o 0 C— W >MM., M W A p .� y U a. ci th r 2 HcinBoi664.- U E `o C / f 0—%18 o� —oo•- 101mm00011O Z y �f3P .M i n W % l^ o - W w C w 1 U N Eiiiii`�'- LL and / a ti °o- m mm0al 005 K �UK� N - u C _8 ar rnolaaa 01LL dam - c - 1-1-0_001-0 ci .cl8 A T . To - 0,__ c d° b E- '� ; I o U Uc F� a m a e.'] ,3 4Ii• U a8 o YY0058Y O u m� W o r. ~o O _ 0 (] ' M Ua 1 3 F > -F � U U @ 10 - - — E- - -' e ` 3 I- V. I- ;0 . - m 88 8 8 —o 2 oo -- s 0. F YY Y Y 0 o ap0 p p EEOOpp til L /�/��y�y 1 Lei O >514fp `.2g&GE01 - 3 F. . C OOO8 7-, T <Q N ,CI.In.ED F C n�oNS .b o Cj co 238878N8G8±8 - /I/� co Eaocoi. U , .4,- 010 _ W a __4=4 0 L w Zfh O) V /a\ ' N J ° O `0.l a 28888888888 p Q p ON ov�vc� roocc vo�J y` U OOrnD �N - 8Q (7) 8 888 < N 10 O N U zo —O Q W a C O 11 0 N 314--4=3884 a Wrne46m INNmm 2 +REEV.n2^812 Io o oov N - ON O —O 0 m 0 (/JOV."e-O,DNN0 /� �— 0 z Oi Cy,ppno 01c00 Vn VO f.-y - 13--i NNNNN,?,?'?c?a? _ OOQ W J O e mm 9` V GOO o,Nnmm,Nn,h A32gg8 —8 J J N N i' neaoaainaioin 0 (.9w0 0 ama`SS`2m"`$1R8`88 - N. _ 00 I m E 0 p GG G U M Y m Z 0)0 ..282 C,�ONi[ii00NN o O m s N 0 N C - <o ^ O 2 rnrn88888S'S g Q U °c i r0, ci Y \• Q EQS•Ua 2h. o�nnNN mm V G a U oNU $ 0, Ca co ca 006 V'1 �p m K E?ii am co cmmNNnn$Sm - 04 a i � in in WY ��H WK �8 nn�n°m°m°a°aa�i —o �YOO , ¢m 17c - G < i oE$8$ + a`aYaY 0 oa .,d,m m 000M00ag��1 - o - N '--c Q Y Z f N N °n°onoeccDin6�cpi po _ U«0. 0 a d Q m n Q C C Ol ZO �NNNI.D0,+100 —v'c. O m 0 C_ +0 N V O _ E O CD -- 0 oa Q - Q - a. Q W a mwinw 0 - .Otn `OS O ® yQ� O Q O J ` f/l�N,�IVNfOI�a701 e- - vI _.,\• ., I 7I 1- Iw�l I? I I I I I ggI I 1 1 1 I I I I I I I I I I I I I I I I I I I , 1 I 1 1 1 1 O t0 ; Y a4c �o �h 8 8 0 ° 8 8 o o o N N .'.1 e.1 O 7 Q. (ub8 0001)(+)11110 J(-)gmos o co co 0 e a a-.- T C C C T r O N M V L 0 0 0 0 0 0 0 O —N U0 c0i E maaaaaaa p Q 0 0 VV Sy cy M0000000 F- d 0 H F =0000000 i7) Co N co m c0 V N co v 00 0 o r 0 a m m m M mvN(0 - O rn W � '1 a co 0 _0 H Y Y Y Y cr0 cr0(00000000 0 CO 0 f0D 0 O > _ 00) 0 O o 0) O v aorn om)om 0.-N 00 O =000000°0 OO OOO o Y - 0 Lo' ,- cn 0.,,,i oirnui of M.-Moai rcueo co Mme.- M co mNM -MNm M r m m m M N M r M rm M.r.N Ol co V O _ H - O. /V V V V mmmrr m W ZNe-N v-NN N O m "p O al ,0 -0 W 1,..r....,,,,, J N d co a ■ 0 0 0 M O m O ONO H M M M M M M M N• a O o)0. • _LL)mm .mm a M c0 000 V Or owon O ¢ (O = / Y ooa0000000 o 0 o /FM co a O C ry, Z m oO cNcN Co 1......1 ^ m Y O ~ // ..00.0.0000 ....m -V m N0000000000 Q WNMMmmm.- NE aaYa`' Q . 1/y' Cu co o co O o v v oco o coo00 0 +onrn°r MN co 0 00 O a 0 - 0 co —_ a Mr co V M 0g ch +.i W O C 4 - m Q >>VM.--0Nrmmo ¢ Y o.�� V v L p W c� ,- >OM.-.-V. 0MO V W �v)3 - Q. ° 0) - O W V.--c+m)m°mD�V co cm0°MO m �mMrrmOM J .. N t ~ +mrmONMmrmM oVMrm�M Q y 4 NV Q U - o 0 O MMM V V.m m mr F¢_ +NNOO7m anM)m W , Or Q r m Mo �. Of H (n0 V e-e-OmNrmM W NMNMMNN U W CO r r U CO, 10,-0 m r O V .0. O. CO 0 W ZN -LbaM m0a�M.- F. J o'0 Y co CO c0 U +M V m M M V m M V N W W LIE'r e - N NNNNmm,,,,,, 0 W O • Q W >nmicmncmncm)MMe4n (� CO CCI O N m m m m m V m V m < 0 N —0 N >M m m M M M m M r M F ~M O N-r 0 S-N 0 Cl. M U _ r. F-rr V°o V Mt�Of OI f� W c0O C0D0000D00 2 r - N 0,-00,-00N-00 0 W - O000 r 000 m m 0 MO 0 cm m m m m m m m m m m c 0 M , 1- - O m M M O O N N N N m m _ 0 �M m m m m m m m W W W 8F2 N L- - 0 _o Mr:000om0MM } ZN co Q Q m M M 0 0 0 0 0 0 0 0 M N - _ Y - co e C _ - 00,-r r0.000m O .. W ____ __.---_ cmmmmrrmmmm -C; 3o O Q _.- _'- -- a N-r=0(000000 ci 33 y ` o _ r r r r M M M M M M N W >. 4 o NV M N•- 0 I v 000Mmmm0Mr. »2•11a,0- t) r O 00mm N OM r M m E d a000 e- M CD F m O000 c0MNC�ONO .-� O « 0 - O Q moroVm�e-mo yey ey�� o O \ 0- C O M MMM N !.N-NWN m0 M V O c/)o ^v` a NMVVm rrOHHHI. f20 1 M O a) o E0000 00 000000 00 + N Y 0 O- O)e-NM V mmr OMB ZYYY Y YYY p --_-- O 1 c+i R N V m m I- 0 o c c�i H F- - - --- ---' Y ,�co COcOOMN.-?M,-Ne-MN' OUm¢2¢O W-I[(ICOCO=CO IL a¢»>>>000Tm225Z� »-,Ux¢00corrJm*-O W c0 O W u_ O - v im OMNmm»7s�U V UHmHFFFFf Hm NN N`FN--~ °O V O v Q N E U M cp F ) 1- Y - C W LL W a 0 0 ,c m 0 C] p N _0 U a . 0 mr 0)000 e-MM V MM O cOm e-y0m am0 N cO cOM N.-r H M - ~ MM O 0 ■ rmv 0rrm0MW00,.-MNe-OOM�N - mm.--NoM s} H C O)O N m S-J 0 D M M N N m M N M M O LO M m c O M O 1 c D c n e D sN M m 00 M 0 �' m Z O N-NNMc0')r O�MNmMmcmOM MN U)V V MmrmaON0 r 0 - 7 00 0 U N M M M V v m m m r r m M M M M M 0 0 0 0 0 0 0 0 0 0 r w 00 U M -0 00 N N N p N mmmmmmmmmmmmmmmmmmmmmmmmmmmmmm ( 5) CO W 0 M M M M M M m m m m m N N N m m m m m m m m m m m M M M M O _ _ M O C 0 N m.Nr mm.-M0MMM,r0000.-m.-.-mm V e-mm 2 c r 44 .. W O r N*-m LO M M N N O.-r m 0 0 m 0 e-0 0 V m M V O N N- p m Q O O - > M N r m N m M V O N V O M m m 0.-N N N M V V W W 0 0 0 0 H N M M M V V V m m m 0 r r r r r r m m m m m m m m m m m m m 0 0 + + -_ N C 000 Q W M co 0 2 ' N N 0 b ©Ud - M O _O.' W W 0 (0(0 - d r V1 �O mm m m 2 O '0 mom .nt O. < E., -.-m I I I I 0 :? .cr,0++c+ (?0@ - m c2 y co 010000 �3> od )--i Q g0>333 NN) w< cUm_9 //''�� �/ 0 so_it W� I�1 F4 F-m0f 22 NN - 0 nu 2-4011 H xg >. oJ E aSV m°¢ 72 Ya a a CO 0.m0 d O S.. $ N N Z C > .o oo �.20 0-, 2 a U o m d Y Y U y Z 0 0 W(A W 0 mN N m� 00 N 22 - O NM*3 .C.'•.. Ma Q a___Cl.y 0 I-000 0.U m NAY e- K d m -o ' a m n000= U >- v UCj)j- i � j > mM m� 3�r m c iii o¢ °@NtN o 9 E _ Z 0 mm - . m¢ > a W 8 8 0 ' 0 ,,,:,-,66 0 0=00000 Z o o `m L _A NcN•)ou0i o e-YYYY W m`N y O _� U 0 I-00 00 00M OW X -.^.---.c _.m - M V m m O m O O m O O Z y J / _ _ M N O c•) "0 00000 O - O CO m m OT COO N 001010,-0 N ° m OU C �o co Q Q a a@ HNNOO :' E =r H 0 w m M 0 ® O_ 0 O O O O CO l.-0 0 0 M 0 O> 0 8 CO O r 000 mo °) C.. ' y £000.0 U f J 0 T - o a o o ��NNO� J ` Y/'Y Y o __-_i . 1 I I � -I I . I T__T - T 1 I I - I 1 __T__-r-- I. I-__-. N 4 : 0 0 0 0 0 0 0 O 0 0 0 0 0 0 0 0 O 0 0 0 0 0 0 0 0 0 0 0 = I. °D V 0 m N a V O co N C V 0 N M M V V m m r r aD M M (uol OOZE)41 as leog-lan aril Halliburton Company H ALLI B U RTO N Standard Proposal Report Database: .Sperry EDM.16 PRD Local Co-ordinate Reference: Well K-10 Company: BP-Alaska TVD Reference: BFE @26.38'+D141 @28.00=54.38'@ 54.38ft(BI Project: Prudhoe Bay MD Reference: BFE @26.38'+D141 @28.00=54.38'@ 54.38ft(BI Site: PB K Pad North Reference: True Well: K-10 Survey Calculation Method: Minimum Curvature Wellbore: Plan K-10C Design: K-10C WP9.0 Project Prudhoe Bay,North Slope,UNITED STATES Map System: US State Plane 1927(Exact solution) System Datum: Mean Sea Level Geo Datum: NAD 1927(NADCON CONUS) Using Well Reference Point Map Zone: Alaska Zone 04 Using geodetic scale factor Site PB K Pad,TR-11-14 Site Position: Northing: 5,973,161.33ft Latitude: 70°19'57.435 N From: Map Easting: 670,342.10ft Longitude: 148°37'5.24 W Position Uncertainty: 0.00 ft Slot Radius: 0" Grid Convergence: 1.30 ° Well K-10,K-10 Well Position +N/-S 0.00 ft Northing: 5,975,196.00 ft Latitude: 70°20'17.355 N +E/-W 0.00 ft Easting: 670,732.00 ft Longitude: 148°36'52.51 W Position Uncertainty 0.00 ft Wellhead Elevation: ft Ground Level: 0.00 ft Wellbore Plan K-10C Magnetics Model Name Sample Date Declination Dip Angle Field Strength (°) (°) (nT) BGGM2009 12/31/2010 21.93 80.97 57,715 Design K-10C WP9.0 Audit Notes: Version: Phase: PLAN Tie On Depth: 11,150.00 Vertical Section: Depth From(TVD) +N/-S +E/-W Direction (ft) (ft) (ft) (°) 28.00 0.00 0.00 117.35 Plan Sections Measured Vertical ND Dogleg Build Turn Depth Inclination Azimuth Depth System +N/-S +E/-W Rate Rate Rate Tool Face (ft) (°) (°) (ft) ft (ft) (ft) (°/100ft) (°/100ft) (°/100ft) (°) 11,150.00 77.80 99.90 8,607.32 8,552.94 -2,834.90 3,694.04 0.00 0.00 0.00 0.00 11,200.00 77.81 97.85 8,617.88 8,563.50 -2,842.44 3,742.33 4.00 0.02 -4.09 -90.00 11,275.63 76.57 100.69 8,634.66 8,580.28 -2,854.31 3,815.11 4.00 -1.63 3.74 114.43 11,506.86 76.57 100.69 8,688.35 8,633.97 -2,896.01 4,036.11 0.00 0.00 0.00 0.00 11,743.26 90.75 100.50 8,714.38 8,660.00 -2,939.10 4,266.48 6.00 6.00 -0.08 -0.75 12,882.08 90.75 100.50 8,699.38 8,645.00 -3,146.66 5,386.12 0.00 0.00 0.00 0.00 13,017.30 90.80 108.62 8,697.54 8,643.16 -3,180.62 5,516.87 6.00 0.03 6.00 89.61 14,314.79 90.80 108.62 8,679.38 8,625.00 -3,594.77 6,746.36 0.00 0.00 0.00 0.00 14,462.97 96.66 109.52 8,669.74 8,615.36 -3,643.05 6,886.05 4.00 3.95 0.61 8.72 15,000.65 96.66 109.52 8,607.38 8,553.00 -3,821.49 7,389.40 0.00 0.00 0.00 0.00 6/24/2010 1:26:41PM Page 2 COMPASS 200116 13ulldl71 Halliburton Company HALL I B U RTO N Standard Proposal Report Database: .Sperry EDM.16 PRD Local Co-ordinate Reference: Well K-10 Company: BP-Alaska ND Reference: BFE @26.38'+D141 @28.00=54.38'@ 54.38ft(BI Project: Prudhoe Bay MD Reference: BFE @26.38'+D141 @28.00=54.38'@ 54.38ft(BI Site: PB K Pad North Reference: True Well: K-10 Survey Calculation Method: Minimum Curvature Wellbore: Plan K-10C Design: K-10C WP9.0 Planned Survey Measured Vertical Map Map Depth Inclination Azimuth Depth TVDss +N/-S +E/-W Northing Easting DLS Vert Section (ft) (°) (°) (ft) ft (ft) (ft) (ft) (ft) -8,552.94 11,150.00 77.80 99.90 8,607.32 -8,552.94 -2,834.90 3,694.04 5,972,446.13 674,489.38 0.00 4,583.48 KOP @ 11150'MD 11,169.22 77.80 99.11 8,611.38 -8,557.00 -2,838.00 3,712.57 5,972,443.45 674,507.97 4.00 4,601.36 fault 11,200.00 77.81 97.85 8,617.88 -8,563.50 -2,842.44 3,742.33 5,972,439.69 674,537.82 4.00 4,629.83 Start Dir:4°/100':11200'MD,8617.88'ND:90°LT TF 11,275.63 76.57 100.69 8,634.65 -8,580.27 -2,854.31 3,815.10 5,972,429.48 674,610.84 4.00 4,699.93 End Dir:11275.63'MD,8634.66'ND 11,300.00 76.57 100.69 8,640.31 -8,585.93 -2,858.71 3,838.40 5,972,425.62 674,634.23 0.00 4,722.63 11,321.81 76.57 100.69 8,645.38 -8,591.00 -2,862.64 3,859.24 5,972,422.16 674,655.16 0.00 4,742.96 TZ1 B 11,400.00 76.57 100.69 8,663.54 -8,609.16 -2,876.74 3,933.97 5,972,409.76 674,730.19 0.00 4,815.82 11,500.00 76.57 100.69 8,686.76 -8,632.38 -2,894.78 4,029.55 5,972,393.91 674,826.15 0.00 4,909.00 11,506.86 76.57 100.69 8,688.35 -8,633.97 -2,896.01 4,036.11 5,972,392.82 674,832.73 0.00 4,915.39 Start Dir 6°/100':11506.86'MD,8688.35'ND 11,506.97 76.57 100.69 8,688.38 -8,634.00 -2,896.04 4,036.22 5,972,392.80 674,832.84 0.00 4,915.50 TDF 11,600.00 82.16 100.61 8,705.54 -8,651.16 -2,912.92 4,126.04 5,972,377.97 674,923.01 6.01 5,003.04 11,700.00 88.16 100.54 8,713.97 -8,659.59 -2,931.20 4,223.95 5,972,361.93 675,021.30 6.00 5,098.40 11,743.26 90.75 100.50 8,714.38 -8,660.00 -2,939.10 4,266.48 5,972,355.00 675,064.00 6.00 5,139.80 End Dir:11743.26'MD,8714.38'ND-K-10C Tgt2 CP1 11,800.00 90.75 100.50 8,713.63 -8,659.25 -2,949.44 4,322.26 5,972,345.93 675,120.00 0.00 5,194.10 11,900.00 90.75 100.50 8,712.32 -8,657.94 -2,967.66 4,420.57 5,972,329.95 675,218.70 0.00 5,289.80 12,000.00 90.75 100.50 8,711.00 -8,656.62 -2,985.89 4,518.89 5,972,313.97 675,317.40 0.00 5,385.51 12,100.00 90.75 100.50 8,709.68 -8,655.30 -3,004.11 4,617.21 5,972,297.99 675,416.10 0.00 5,481.21 12,200.00 90.75 100.50 8,708.36 -8,653.98 -3,022.34 4,715.52 5,972,282.01 675,514.80 0.00 5,576.91 12,300.00 90.75 100.50 8,707.05 -8,652.67 -3,040.57 4,813.84 5,972,266.02 675,613.49 0.00 5,672.61 12,400.00 90.75 100.50 8,705.73 -8,651.35 -3,058.79 4,912.16 5,972,250.04 675,712.19 0.00 5,768.31 12,500.00 90.75 100.50 8,704.41 -8,650.03 -3,077.02 5,010.47 5,972,234.06 675,810.89 0.00 5,864.01 12,600.00 90.75 100.50 8,703.10 -8,648.72 -3,095.24 5,108.79 5,972,218.08 675,909.59 0.00 5,959.71 12,700.00 90.75 100.50 8,701.78 -8,647.40 -3,113.47 5,207.10 5,972,202.10 676,008.29 0.00 6,055.42 12,800.00 90.75 100.50 8,700.46 -8,646.08 -3,131.70 5,305.42 5,972,186.12 676,106.99 0.00 6,151.12 12,882.08 90.75 100.50 8,699.38 -8,645.00 -3,146.66 5,386.12 5,972,173.00 676,188.00 0.00 6,229.67 Start Dir 6°/100': 12882.08'MD,8699.38'ND-K-10C Tgt2 CP2 rev2 12,900.00 90.76 101.58 8,699.14 -8,644.76 -3,150.09 5,403.70 5,972,169.97 676,205.66 6.00 6,246.87 13,000.00 90.80 107.58 8,697.78 -8,643.40 -3,175.24 5,500.43 5,972,147.02 676,302.93 6.00 6,344.34 13,017.30 90.80 108.62 8,697.54 -8,643.16 -3,180.62 5,516.87 5,972,142.03 676,319.49 6.00 6,361.41 End Dir:13017.3'MD,8697.54'ND 13,100.00 90.80 108.62 8,696.38 -8,642.00 -3,207.01 5,595.24 5,972,117.42 676,398.43 0.00 6,443.15 13,200.00 90.80 108.62 8,694.98 -8,640.60 -3,238.93 5,690.00 5,972,087.67 676,493.88 0.00 6,541.98 13,300.00 90.80 108.62 8,693.58 -8,639.20 -3,270.85 5,784.76 5,972,057.92 676,589.34 0.00 6,640.81 13,400.00 90.80 108.62 8,692.18 -8,637.80 -3,302.77 5,879.52 5,972,028.17 676,684.79 0.00 6,739.64 13,500.00 90.80 108.62 8,690.78 -8,636.40 -3,334.69 5,974.27 5,971,998.42 676,780.25 0.00 6,838.48 13,600.00 90.80 108.62 8,689.38 -8,635.00 -3,366.61 6,069.03 5,971,968.66 676,875.70 0.00 6,937.31 13,700.00 90.80 108.62 8,687.98 -8,633.60 -3,398.53 6,163.79 5,971,938.91 676,971.16 0.00 7,036.14 &2412010 1:26:41PM Page 3 COMPASS 2003.15 Build 71 Halliburton Company H A L L I B U R TO N Standard Proposal Report Database: .Sperry EDM.16 PRD Local Co-ordinate Reference: Well K-10 Company: BP-Alaska TVD Reference: BFE @26.38'+D141 @28.00=54.38'@ 54.38ft(BI Project: Prudhoe Bay MD Reference: BFE @26.38'+D141 @28.00=54.38'@ 54.38ft(BI Site: PB K Pad North Reference: True Well: K-10 Survey Calculation Method: Minimum Curvature Wellbore: Plan K-10C Design: K-10C WP9.0 Planned Survey Measured Vertical Map Map Depth Inclination Azimuth Depth TVDss +N/-S +E/-W Northing Easting DLS Vert Section (ft) (°) (°) (ft) ft (ft) (ft) (ft) (ft) -8,632.21 13,800.00 90.80 108.62 8,686.59 -8,632.21 -3,430.45 6,258.55 5,971,909.16 677,066.61 0.00 7,134.97 13,900.00 90.80 108.62 8,685.19 -8,630.81 -3,462.37 6,353.31 5,971,879.41 677,162.06 0.00 7,233.80 14,000.00 90.80 108.62 8,683.79 -8,629.41 -3,494.29 6,448.07 5,971,849.66 677,257.52 0.00 7,332.63 14,100.00 90.80 108.62 8,682.39 -8,628.01 -3,526.21 6,542.82 5,971,819.90 677,352.97 0.00 7,431.47 14,200.00 90.80 108.62 8,680.99 -8,626.61 -3,558.13 6,637.58 5,971,790.15 677,448.43 0.00 7,530.30 14,300.00 90.80 108.62 8,679.59 -8,625.21 -3,590.05 6,732.34 5,971,760.40 677,543.88 0.00 7,629.13 14,314.79 90.80 108.62 8,679.38 -8,625.00 -3,594.77 6,746.36 5,971,756.00 677,558.00 0.00 7,643.75 Start Dir 4°/100': 14314.79'MD,8679.38'TVD-K-10C Tgt2 CP3 rev1 14,400.00 94.17 109.13 8,675.68 -8,621.30 -3,622.31 6,826.90 5,971,730.31 677,639.14 4.00 7,727.94 14,462.97 96.66 109.52 8,669.74 -8,615.36 -3,643.05 6,886.05 5,971,710.92 677,698.75 4.00 7,790.01 End Dir:14462.97'MD,8669.74'TVD 14,500.00 96.66 109.52 8,665.45 -8,611.07 -3,655.34 6,920.71 5,971,699.42 677,733.68 0.00 7,826.44 14,600.00 96.66 109.52 8,653.85 -8,599.47 -3,688.53 7,014.33 5,971,668.38 677,828.02 0.00 7,924.84 14,700.00 96.66 109.52 8,642.25 -8,587.87 -3,721.71 7,107.95 5,971,637.33 677,922.36 0.00 8,023.24 14,800.00 96.66 109.52 8,630.65 -8,576.27 -3,754.90 7,201.57 5,971,606.29 678,016.71 0.00 8,121.64 14,900.00 96.66 109.52 8,619.05 -8,564.67 -3,788.09 7,295.18 5,971,575.24 678,111.05 0.00 8,220.04 15,000.00 96.66 109.52 8,607.45 -8,553.07 -3,821.27 7,388.80 5,971,544.20 678,205.39 0.00 8,318.44 15,000.64 96.66 109.52 8,607.38 -8,553.00 -3,821.48 7,389.40 5,971,544.00 678,205.99 0.00 8,319.07 Total Depth:15000.65'MD,8607.38'TVD-4 1/2" 15,000.65 96.66 109.52 8,607.38 -8,553.00 -3,821.49 7,389.40 5,971,544.00 678,206.00 0.00 8,319.08 K-10C Tgt3 rev4 8/24/2010 1:26:41PM Page 4 COMPASS 200116 EkeId 71 Halliburton Company HALLI B U RTO N Standard Proposal Report Database: .Sperry EDM.16 PRD Local Co-ordinate Reference: Well K-10 Company: BP-Alaska ND Reference: BFE @26.38'+D141 @28.00=54.38'@ 54.38ft(BF Project: Prudhoe Bay MD Reference: BFE @26.38'+0141 @28.00=54.38'@ 54.38ft(BF Site: PB K Pad North Reference: True Well: K-10 Survey Calculation Method: Minimum Curvature Wellbore: Plan K-10C Design: K-10C WP9.0 Targets Target Name - Dip Angle Dip Dir. ND +N/-S +E/-W Northing Easting -Shape (°) (°) (ft) (ft) (ft) (ft) (ft) K-10C Fault 1 0.00 0.00 8,721.38 -2,663.33 3,841.62 5,972,621.00 674,633.00 -Polygon Point 1 8,721.38 -2,663.33 3,841.62 5,972,621.00 674,633.00 Point 2 8,721.38 -3,095.34 3,791.77 5,972,188.00 674,593.00 K-10C Tgt2 CP3 revl 0.00 0.00 8,679.38 -3,594.77 6,746.36 5,971,756.00 677,558.00 -Point K-10C Tgt2 CP2 rev2 0.00 0.00 8,699.38 -3,146.66 5,386.12 5,972,173.00 676,188.00 -Point K-10C Tgt3 rev4 0.00 0.00 8,607.38 -3,821.49 7,389.40 5,971,544.00 678,206.00 -Point K-10C GeoPoly revl 0.00 0.00 8,679.38 -2,797.97 3,999.60 5,972,490.00 674,794.00 -Polygon Point 1 8,679.38 -2,797.97 3,999.60 5,972,490.00 674,794.00 Point 2 8,679.38 -2,889.20 4,491.68 5,972,410.00 675,288.00 Point 3 8,679.38 -3,017.54 5,471.08 5,972,304.00 676,270.00 Point4 8,679.38 -3,630.53 7,657.84 5,971,741.00 678,470.00 Point 5 8,679.38 -4,074.21 7,461.67 5,971,293.00 678,284.00 Point 6 8,679.38 -3,352.92 5,614.49 5,971,972.00 676,421.00 Point 7 8,679.38 -3,180.44 4,893.18 5,972,128.00 675,696.00 Point 8 8,679.38 -2,973.03 3,955.60 5,972,314.00 674,754.00 Point 9 8,679.38 -2,797.97 3,999.60 5,972,490.00 674,794.00 K-10C Tgt2 CP1 0.00 0.00 8,714.38 -2,939.10 4,266.48 5,972,355.00 675,064.00 -Point K-10C Tgt1 rev2 0.00 0.00 8,233.38 -2,721.06 3,082.05 5,972,546.00 673,875.00 -Point I Casing Points Measured Vertical Casing Hole Depth Depth Diameter Diameter (ft) (ft) Name (") (") ` 2,694.08 2,693.99 13 3/8" 13-3/8 17-1/2 3,251.00 3,247.24 9 5/8" 9-5/8 12-1/4 10,356.98 8,200.38 7" 7 8-1/2 15,000.64 8,607.38 4 1/2" 4-1/2 6-1/8 8242010 1:26:41PM Page 5 COMPASS 2003.18 Buid 71 Halliburton Company HALLI B U RTO N Standard Proposal Report Database: .Sperry EDM.16 PRD Local Co-ordinate Reference: Well K-10 Company: BP-Alaska TVD Reference: BFE @26.38'+D141 @28.00=54.38'@ 54.38ft(BI Project: Prudhoe Bay MD Reference: BFE @26.38'+D141 @28.00=54.38'@ 54.38ft(BI Site: PB K Pad North Reference: True Well: K-10 Survey Calculation Method: Minimum Curvature Wellbore: Plan K-10C Design: K-10C WP9.0 Formations Measured Vertical Vertical Dip Depth Depth Depth SS Dip Direction (ft) (ft) ft Name Lithology (0) (0) 3,225.65 3,222.38 SV4 11,169.22 8,611.38 fault 9,685.10 7,643.38 THRZ 10,676.12 8,441.38 BCGL 10,599.45 8,391.38 TCGL 11,321.81 8,645.38 TZ1B 8,866.59 7,079.38 CM2 3,752.47 3,718.38 SV3 10,838.85 8,525.38 22TS 7,262.63 6,203.38 WS1 4,301.75 4,252.38 SV1 3,906.06 3,865.38 SV2 10,243.60 8,106.38 TJA 10,406.44 8,241.38 TSHA 10,755.65 8,486.38 23SB 8,721.38 BSAD 9,954.11 7,866.38 TJC 10,994.13 8,574.38 21TS 10,135.04 8,016.38 TJB 11,506.97 8,688.38 TDF 7,652.64 6,416.38 CM3 2,970.70 2,970.38 SV5 9,943.25 7,857.38 LCU/TJD 9,359.79 7,389.38 CM1' 10,356.98 8,200.38 TSGR 6,929.39 6,021.38 WS2 10,463.26 8,288.38 TSAD 5,843.61 5,428.38 UG1 4,774.70 4,697.38 UG4 5,058.60 4,936.38 UG3 9,923.95 7,841.38 BHRZ Plan Annotations Measured Vertical Local Coordinates Depth Depth +N/-S +E/-W (ft) (ft) (ft) (ft) Comment 11,150.00 8,607.32 -2,834.90 3,694.04 KOP @ 11150'MD 11,200.00 8,617.88 -2,842.44 3,742.33 Start Dir:4°/100':11200'MD,8617.88'TVD:90°LT TF 11,275.63 8,634.65 -2,854.31 3,815.10 End Dir: 11275.63'MD,8634.66'TVD 11,506.86 8,688.35 -2,896.01 4,036.11 Start Dir 6°/100': 11506.86'MD,8688.35'TVD 11,743.26 8,714.38 -2,939.10 4,266.47 End Dir: 11743.26'MD,8714.38'TVD 12,882.08 8,699.38 -3,146.66 5,386.12 Start Dir 6°/100': 12882.08'MD,8699.38'TVD 13,017.30 8,697.54 -3,180.62 5,516.87 End Dir: 13017.3'MD,8697.54'TVD 14,314.79 8,679.38 -3,594.77 6,746.36 Start Dir 4°/100': 14314.79'MD,8679.38'TVD 14,462.97 8,669.74 -3,643.05 6,886.05 End Dir: 14462.97'MD,8669.74'TVD 15,000.64 8,607.38 -3,821.48 7,389.40 Total Depth: 15000.65'MD,8607.38'TVD 8/24/2010 1:26:41 PKf Page 6 COMASS 23.16 audd 71 N m M n p :� C T, 7f Iii) O 0 0 W on 8�` 2 F� V _ U C)000)COO IO W U)N NW0OW0W W Wr-N 06M6666,-666 O0). E E . �WNO-NNW 0r- y3 n aC O O vveoommpm�na0 as aG U) 0 0- co UOOONio001,001Oi00f000 N u O H co O -�n m m L 0101-,-0000000 0 aJ fN7 v> 0111111111111111111 V ��c.,.-m m oO r ▪ °o d2 @J © 1110117 _ _ > W w7N1nWWWmWWWO � i0 0 .. p J +COO N 0ONR OO n 0000)O O,�,C MO CCVC 0 •.; co Q CC)C)C7V VU)W COWA J n iO N 0 Cl)A.-0�0e-A00V O II IpI 0 — ❑ OCOVNNWAONA N-1.7 O 06 O Z +NV Loom..mOVN V y LW a0 Q 0 NNNNNt7 th MCm O r Z;8,_ W O�t00 1+5 00N V MNM IV j O)O .— . m W �I�r<CCO O)0)I� Q f Q N Z-• O � W W W W A W W W W W UA r O A U W W W N W W W W W W N w� o E O N01000OONNNN O W Y e h Q O W W W W W W W W e CC N mp0000 Z Z m0000 m W O] i < UO.AAW WOO W W OCI 0 w d N Oi C1 V 0.• L C 00W WAAO W W W W o U o U O Y er A W W 0 0 0 0 tD ep r 0 2 ````« 0 C A AAA 0 Ol)0 0 0 0 Zn Eel yryy 0' O A O 000 C)WWWO0 A10 CC NM O Y . •j, m0OWWNOC)A0W 'O W mw w w C C) C N U 06666 NN V NO w 4 m p ^oAOaW,-.-Wo re Csi— --c m A NNNA W OC)V O 0 2 qaq11 _. N = NM V V W O y C O 0 U O A e0'CC-V O •� d 0 + C�?�yV+dU Wm-NC)V W WAWO,- W O N N 'z. 9_ +o U 0 E 0 0p 0 0 0 0 0 0 0 0 G O N 0 10O 0 10O 0 10O O N N N t7 CI V a N O Q 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 O . O O N O N 0 Q N N C9 M a a N LL 0 (_� W o WO vINW� 0 O N co W Q CO v-Oi CO . O N L ,,,b; - a co 2 m m a O O F o FQ- Co• W c gil w Co .0° 0 d 6 gS2g Z 08822 ff,� W C� d a aaac J b�UU Q 2rni"cod o G X76 ,.:.. 0 L E ° U NMO° G)J��a� t rJ 2u. . #11111\ U F rnaWW`� c �33�ii MNtnM u0+FdIU� G C d >mNN00 L A m, NC)W W C aL U U`y yQ C U O:LL CL 7000 0 m `¢7 x000 }} aY1YG�i O a. 'bill b.n v } O W _a W Y W 000 A a=+ s o g-;-i»Ρ;4 0 a a 2 m L !i'a co >' ti'aaUa(3� o e r W m 3 41 O o o O 1 W..Yi�i.�W QQ U CU3 M •T U EwU,_ N oD F°°�3,'a,age Q w� c1U o a $ .29)8101°1$ , EW 2L�wz C O ~ Cd L.U.t .2 Q N y N y y Q oll gO$$aS Z 2W2W2 a! o d W o en° o 8� , � r- 0 ∎.n Z iW W W E U'�� N = C t6 Y. al BPPASSPORT Anticollision Report Company: North America-ALASKA-BP Local Co-ordinate Reference: Well K-10 Project: Prudhoe Bay TVD Reference: BFE@26.38'+D141@28.00=54.38'@ 54.38ft(BFE @2i Reference Site: PB K Pad MD Reference: BFE @26.38'+D141 @28.00=54.38'@ 54.38ft(BFE @2i Site Error: 0.00ft North Reference: True Reference Well: K-10 Survey Calculation Method: Minimum Curvature Well Error: 0.00ft Output errors are at 1.00 sigma Reference Wellbore Plan K-10C Database: EDM.16-ANC Prod-WH24P Reference Design: K-10C WP9.0 Offset TVD Reference: Offset Datum Reference K-10C WP9.0 Filter type: GLOBAL FILTER APPLIED:All wellpaths within 200'+100/1000 of referE Interpolation Method: MD Interval 25.00ft Error Model: ISCWSA Depth Range: 11,150.00 to 15,000.65ft Scan Method: Tray.Cylinder North Results Limited by: Maximum center-center distance of 1,697.26ft Error Surface: Elliptical Conic Survey Tool Program Date 8/24/2010 From To (ft) (ft) Survey(Wellbore) Tool Name Description 100.08 3,250.00 1 :Sperry-Sun BOSS gyro multi(K-10) BOSS-GYRO Sperry-Sun BOSS gyro multishot 3,250.00 3,600.00 K-10C Pb1 Wp 3.0(Plan K-10C Pb1) GYD-GC-SS Gyrodata gyro single shots 3,600.00 10,356.98 K-10C Pb1 Wp 3.0(Plan K-10C Pb1) MWD+IFR+MS MWD+IFR+Multi Station 10,356.98 11,150.00 K-10C Pb1 Wp 3.0(Plan K-10C Pb1) MWD+IFR+MS MWD+IFR+Multi Station 11,150.00 15,000.65 K-10C WP9.0(Plan K-10C) MWD+IFR+MS MWD+IFR+Multi Station Summary Reference Offset Centre to No-Go Allowable Measured Measured Centre Distance Deviation Warning Site Name Depth Depth Distance (ft) from Plan Offset Well-Wellbore-Design (ft) (ft) (ft) (ft) PB DS 15 15-29-15-29B-15-29B 11,572.13 15,037.00 1,083.71 201.74 891.23 Pass-Major Risk PB K Pad K-06_DIMS-K-06-K-06 Out of range K-06_DIMS-K-06-K-06 Out of range K-06_DIMS-K-06-K-06 Out of range K-08_DIMS-K-08-K-08 Out of range K-08_DIMS-K-08-K-08 Out of range K-08_DIMS-K-08B-K-08B Out of range K-09_DIMS-K-09-K-09 Out of range K-09_DIMS-K-09-K-09 Out of range K-09_DIMS-K-09-K-09 Out of range K-09_DIMS-K-09-K-09 Out of range K-09_DIMS-K-09A-K-09A Out of range K-10-Plan K-10C Pb1 -K-10C Pb1 Wp 3.0 11,349.96 11,350.00 0.85 5.39 -4.14 FAIL-Major Risk K-10_DIMS-K-10-K-10 Out of range K-10_DIMS-K-10A-K-10A Out of range K-10_DIMS-K-10B-K-10B Out of range K-10_DIMS-K-10CXX-K-10CXX Out of range K-19_DIMS-K-19-K-19 Out of range K-19_DIMS-K-19A-K-19A Out of range K-19_DIMS-K-19AL1 -K-19AL1 Out of range &"2442010 4:14:33PM Page 2 of 3 COMPASS 21)03_16 Bald 71 BPPASSPORT Anticollision Report Company: North America-ALASKA-BP Local Co-ordinate Reference: Well K-10 Project: Prudhoe Bay TVD Reference: BFE @26.38'+D141 @28.00=54.38'@ 54.38ft(BFE @21 Reference Site: PB K Pad MD Reference: BFE @26.38'+D141 @28.00=54.38'@ 54.38ft(BFE @21 Site Error: 0.00ft North Reference: True Reference Well: K-10 Survey Calculation Method: Minimum Curvature Well Error: 0.00ft Output errors are at 1.00 sigma Reference Wellbore Plan K-10C Database: EDM.16-ANC Prod-WH24P Reference Design: K-10C WP9.0 Offset TVD Reference: Offset Datum Reference Depths are relative to BFE @26.38'+D141 @28.00=54.38' Coordinates are relative to:K-10 Offset Depths are relative to Offset Datum Coordinate System is US State Plane 1927(Exact solution),Alaska Zone 04 Central Meridian is 150°0'0.000 W° Grid Convergence at Surface is: 1.30° Ladder I - 1 1 Plot 1 c 1300 1 I I I I 1 I I I I I 1 I I 1 1 1 I I I I I J J J J J J \\ _ _ I I I I I I 1 I I I 1 I I r I I I I I `r-- 1:350 p I I I 1 1 Lai I I I I 1 1 I I 1 I 1 I C I I I I I I _ _ __ J____1 ____J J J J J _ _ t3 I I I I I I I I I I I I I I I I I j I 1 I I I I C') 900 y I I I I I I 1 I I I I I C I I I I 1 I a) I I I I I I 0 I 1 I I I I 1 I I I I 2 1 1 c I I I I 1 I `) 450 r r I r r o I I I I , 1 ;LEGEND 1 1 i I 1 J J J J J -I- 15-29, 5-29 B,15-20B'�13 I if K-08,K-O81.K-081x3 1 -31(- K-t0_0MS,K-10 A.K-101A'O 1 I I I I -$- K-05,K`05,K-05 V4 1 K-08,K-O81A,K-08A ' I - K-t0_DMS.K-10B.K-101BVD 1 I I I I . -B- KV K.05A K-054V5 . $ K-08 K-08LA Plan N3. -- K-tQLDMS K-10 CX X K.IOC X VC K-05,1405B,K-05BV1 ?IJ00 y04,O8,K-08B.K-O8 b' 10 8000 K-11,K 111-1C.L1.V1 12000 K-05,KJJ-0513,Plan it 10 VI -F-'UK--08-Ja ea§Ur2dbUepYi(2000 Min) K-11•Plan 8JJ.UUK��-JJ111 A,Plan 8 VO K-05,K-05BP B1.K-0513 wp08 VI K-08_Dtu1S.K-08,K-0850 -XF K-13.1.443.K-13 VI -- 1..-13S,R=059PBi,r..-05BPBIvIL K-08_in tors,K-088,R-088e0 _ - - K-05,K-05r_,K-0 5CVS K-09,K-09,K-0 9 V1 -9- K-16-K-18A,K-18AVI 3- K-013,K-013,K-013 V4 K-09,K-0 9A,K-0 9AV1 -4- K-WK-16AL1,K-113 ALI\f2 K-08.K-08.A.,K-OSA'v'1 -f- K-0 9.K-09APB1,K-09APB1 V1 - K-16,K-16AL2.K-18.AL2VD - K-08,K-08B.K-08B V2 -X- K-09.K-09B,K-09BV2 K-17,K-179,K-3179V7 -I- K-08_OIt:3,K-O8,K-08'vD •,- K-09,K-09BPB1.K-09BPB1V'2 K-17,K-17B,PIan#126V1 K-013 OMS,K-08,K-OS'vS K-09,K-09 C,K-09 C V2 K-19,K-19,K-19V1 - -- K-08_0 BASK-08,K-08'•Ai K-09_0MS,K-09,K-09 VO -X- K-19,K-19A,K-19AV1 K-07,K-07,K-07'..,15 K-09_D tot S,K-09.K-09 VD K-19,K-19.ALI,K-19.AL1 V2 K-07.K-07.A,K-07.A'v) K-09_01'09,K-09.K-09 VD -8- K-19_DMS,K-19.K-19'v13 K-07,K-07AP13 1,K-07APB1'•.L; K-09_0RAS,K-09.K-09 VD -e- K-19_0MS,K-19A,K-19AVO a/24/2010 4 14 33PM Page 3 of 3 COMPASS 2003.16 Build 71 3 _ 1 iry ii)r�) -_______ - - '� cc 0n+++ - 4::R. J V�S�3,J:S= 1 m f\ 1 Hm^=S ` ��n Fug^.7JUn ue'u 3:1 i JJ t ;7:1 Ts3 �3�3���� Y r Ij�r�f it?, �-.. 1, S ao �,imo.ris�i / f „Y CY�� >� \\\\\,, - �J Q t:2!!:+q�(ry.Ti a,r-.��ir- 0.II 1 y o ) m !! 0 v w ryry.�ry `aids T li.oW�33 :J�Y if u y- Z Eaa?0? aa2 eVnearo-ua2 �j e '3 '412214iii tNi 4t f - W tLL aft* 1.a ---- - �`.a.' +ll a C 41y „„.,,,...c. "raa• ya - �aoa f -74R5.1 • i- 1 2// '= I i% // 7 1 ■ i„II Itti 4..: 9 ..., i I 1 I -7 a 1 ( I roan I ' ��__� 1 - I I t0 m 3� „:rte ` I =` ] c / J co 9,_,s �. �� 0. 0 0 , 0. Alaska Department of Natural R esources Land Administration System Page 1 of2'/ %Alaska Mapper Land Records/Status Plats Recorder's Search State Cabins Natural Resources Alaska DNR Case Summary File Type: ADL File Number: 28303 Printable Case File Suinmary See Township,Range, Section and Acreage? I a® Yes O NO L New Search LAS Menu I Case Abstract I Case Detail I Land Abstract File: ADL 28303 Search for Status Plat Updates. As of 09/09/2010 Customer: 000107377 BP EXPLORATION(ALASKA)INC PO BOX 196612/900 E. BENSON BL ATTN: LAND MANAGER- ALASKA ANCHORAGE AK 995196612 Case Type: 784. OIL&GAS LEASE COMP DNR Unit: 780 OIL AND GAS File Location:DOG DIV OIL AND GAS Case Status: 35 ISSUED Status Date: 09/14/1965 Total Acres: 2560.000 Date Initiated: 05/28/1965 Office of Primary Responsibility:DOG DIV OIL AND GAS Last Transaction Date: 12/04/2006 Case Subtype: NS NORTH SLOPE Last Transaction: AA-NRB ASSIGNMENT APPROVED Meridian: U Township: 011N Range: 014E Section: 03 Section Acres: 640 Search Plats Meridian: U Township: O11N Range: 014E Section: 04 Section Acres: 640 Meridian: U Township: 011N Range: 014E Section: 09 Section Acres: 640 Meridian: U Township: 011N Range: 014E Section: 10 Section Acres: 640 Legal Description 05-28-1965 ***SALE NOTICE LEGAL DESCRIPTION*** C14-12411 N 14E UM 3, 4, 9,10 2560.00 U-3- 7 End of Case Summary Last updated on 09/09/2010. http://dnr.alaska.gov/projects/las/Case Summary.cfm?FileType=ADL&FileNumber=28303... 9/9/2010 TRANSMITTAL LETTER CHECKLIST WELL NAME /.seY///f''/ e PTD# „v?ld,0.7d7 Development Service Exploratory Stratigraphic Test Non-Conventional Well FIELD: f.Pdd.44:3E ,.7)/ POOL: .4'4'I,4/0E 3#IY• G Circle Appropriate Letter I Paragraphs to be Included in Transmittal Letter CHECK ADD-ONS WHAT (OPTIONS) TEXT FOR APPROVAL LETTER APPLIES MULTI LATERAL The permit is for a new wellbore segment of existing well (If last two digits in Permit No. ,API No. 50- - - API number are between 60-69) Production should continue to be reported as a function of the original API number stated above. PILOT HOLE In accordance with 20 AAC 25.005(f), all records, data and logs acquired for the pilot hole must be clearly differentiated in both well name ( f81( K-/OC P81 PH) and API number (50- 021- Z./7 6.2- - 7b) from records, data and logs acquired for well tom( SPACING The permit is approved subject to full compliance with 20 AAC EXCEPTION 25.055. Approval to perforate and produce / inject is contingent upon issuance of a conservation order approving a spacing exception. assumes the liability of any protest to the spacing exception that may occur. DRY DITCH All dry ditch sample sets submitted to the Commission must be in SAMPLE no greater than 30' sample intervals from below the permafrost or from where samples are first caught and 10' sample intervals through target zones. Non-Conventional Please note the following special condition of this permit: Well production or production testing of coal bed methane is not allowed for (name of well) until after (Company Name) has designed and implemented a water well testing program to provide baseline data on water quality and quantity. (Company Name) must contact the Commission to obtain advance approval of such water well testing program. Rev: 1/11/2008 To o a) a (a u, a) O `o `m T, c a c 0 T. `o > L "O W (n E 0 O a c o a E E co in CO co O N N L a 0 .3 N To CD N 00 0 co o o = M a a To u) -0 0 a) Ti 2 Q O N 0 W c0 a CD 'N N o co,- N Y 4 n E - a) O O' a) -O M o r O O. N N N N 3 cc)u) V. M `O C. CO O "O -C r _ Z a) co a V) n m Y p C Q o m N in m 0 •- C V) O co O M C N W ) u) O o a Y CO m a rn E a �� m co CD o rn o Y c c o m C -> 0. C CD ill Y a) 0 co c L a) to ai c a• @ o C co o c - 3 '7 0 a u) E 0 2 xt 0) o) Tv) -0 3 u) >, a) CO "O. a).. c C 0 -0 't o O. C O l0 a)' N a) U C a) C _ O N CO 0 0 CO O E a s >, 0 CO N Y ) Z• O m a a o 0 v E a)as 0 a 0 m 7 N O O 7 7 O O 2 O O a) N <co N 0 • Z CO O co u) a u) Q co a 5 2 2 I 2 W a > w 0 < a) a) a a) a) a) a) a) a) a a) a. Q Q. Q Q Q Q Q Q a a a a a Q. a) a s a a) a s 0 0 0 Q Q $ a Z > > > > > > > > > > > > Z Z Z Z Z Z z z > > > > > Z > > } } > >- Z z z Z Z Z T Q I- --,) a) m 0 , U n o C TO ii E o (-) HI c 0 cno 2 3 CO a) O .co 0 O a) c C - 0 �_ o 'Z Y E o io O Z • u) u) < 0) o E u' o• co 0 w co° > c o N U n a) o o N n o a) . 2 3 o v �_ �, y no o c c >, C 7 Q -O N u) a3 Da) 4 N .0 Q• N N. o a O) �' a O ^,{ry, U r flfl (n C a E m u `° n >, m E o m a 3 .. c o a 3 13 22 N Q a) 3 a) - . 0 E a) a) .5 O co -o O o c w CO Z - .0 m i Z u) 0 O (/) C O) L C u) j O" Ln 0 < N u) a) N 0) .. W -o 0 C -o o a) .E o- D o ` a) m o o m a) a L C C c o O _ a) N N > U > -O n 0 in u! O O 0)N E E -o c c E a) o (`') c c N c o a2) a? c E a) a N t a c c = Q O O -0 7 O "O C 3 O U (p n U C O 0 0 U) N > O • Y w U 'O U (D N O O Q O N a 3 U a s 0 - O o, a @ 3 > 0 Y a) N • Q S] 0 a) a) C >, O 7 7 0 a7 O Y 0 0 O `O > 0 O E 0 a) m Q (a 1] u) "O 0 0) 0 a) a) u)• c E °n v U °) r o 0 o c m - n Z o E = 3 CD o m .c o 3 w a) E , a Q @ o m as °) as n) E m, m C °) a M N r a o w o a 3 0' o '� c E eL o Z' .Q Co c u) (n .- o m 3 3 a) ro a) .. o a .2 (1) 30 2 92 co m o m an 'a 5 a 0 3 o r 0 ° W U o p' o c > o a) n a o m `o c o N o o c 6 o N -o a) a) o o c o a n a) J a H Cl) a 0 '00 a`) a`) 0 U O` 7 7 a C V o Q O a) a) _ "00 O O a) N E co o ff'' u) ° 0 c O (n o o -o ats a o m E m p p @ o m n .N .N a) L - c (n m es a, . a) (n as a) 2O 2 o E c 3 N c .N w > 2 ti .N O n a) O r° .E n n ,_ >-• m a) o a) 3 c .o rn c m o• o• a) c c m — E n r m o o o o > ' a) u: J 0 � C "O "O -0 0 '- u) -0 S) n -0 L a) N a) Cl) > ,O) L a) O' N Li_ a) a) m a) o t c C a) 0 • m o a o w @ = 3 �' 0 0 N .E o a) m c ac) c CD X = a) @ (6 @ a) 0 0 E f6 3 O d O U as CO U 0 _ « •0 as _ c U a) (n a) OO c Nw 4- C 3 0 0 0 , @ 0 0 0 0 o U _U) o c U a) o o is -o as W ui a E a) .E 0 22 o -o cy,a a) 7 0 0 0 U .� (` (L n a) n OU 0 > > 3 C 6 N Q 0 W W y Y N L O E 0 a) Y m E a) 'C a) m . 7 00 n n a) a) m a) 3 o o = 2 2 2 m -00 m a C 0 0 .0 o N ate) a) CO a a C 0 ✓ C a .J D > s s (n O 0 a a U 5 ¢ a Z 0 (n 0 0 0 U a ''- Q 0 CO CO 0 5- _ a 0 CO (n 0 W a O N M V to (0 N CO CA O N M V (f7 M W m O N M V 10 CO N a0 O I o ,- N M • Lf) CO I . CO C)) CD N N N N N N N N N N c') (C) C) M C) (C) M M M C) U U I.. _o 0 o y E a) O °) O °).. O C G O C RS N 16 N (6 N U 0 Ix co O p rn 0) p N G a _0 m W �' A Cr) o 0) O E• J 0. o �' ai rn O E J #t a (n fl cn c a (n 0 °I13 a a ` a " d � a a a w 0