Department of Commerce, Community, and Economic Development
Alaska Oil and Gas Conservation
Commission
HOME
EVENTS
DATA
Data List
Drilling
Production
Orders
Data Miner
Document Search
REPORTS
Reports and Charts
Pool Statistics
FORMS
LINKS
Links
Test Notification
Data Requests
Regulations
Industry Guidance Bulletins
How to Apply
ABOUT US
History
Staff
HELP
Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
207-157
David Douglas Hilcorp Alaska, LLC Sr. GeoTechnician 3800 Centerpoint Drive, Suite 1400 Anchorage, AK 99503 Tele: (907) 777-8337 E-mail: david.douglas@hilcorp.com Please acknowledge receipt by signing and returning one copy of this transmittal Received By: Date: Date: 07/23/2024 To: Alaska Oil & Gas Conservation Commission Natural Resource Technician 333 W 7th Ave Suite 100 Anchorage, AK 99501 DATA TRANSMITTAL Well Name PTD Number API Number 18-13 187-100 50-029-21756-00-00 18-13PB1 187-100 50-029-21756-70-00 18-13PB2 187-100 50-029-21756-71-00 18-13A 197-223 50-029-21756-01-00 18-13B 207-157 50-029-21756-02-00 18-13BPB1 207-157 50-029-21756-72-00 18-13BPB2 207-157 50-029-21756-73-00 18-13BPB3 207-157 50-029-21756-74-00 18-13C 210-186 50-029-21756-03-00 Definitive Directional Surveys (Composited) -Gyrodata Re-Survey 06/25/2023 Main Folder Contents: Please include current contact information if different from above. T39261 T39262 T39263 T39264 T39265 T39266 T39267 T39268 T39269 18-13B 207-157 50-029-21756-02-00 18-13BPB1 207-157 50-029-21756-72-00 18-13BPB2 207-157 50-029-21756-73-00 18-13BPB3 207-157 50-029-21756-74-00 Gavin Gluyas Digitally signed by Gavin Gluyas Date: 2024.07.24 08:23:01 -08'00' • Image Project Well History File Gover Page XHVZE This page identifies those items that were not scanned during the initial .production scanning phase. They are available in the original file, may be scanned during a special rescan activity or are viewable by direct inspection of the file. ~~~ - ~ ~~ Well History File Identifier Organizing (done) ^ Two-sided III IIII~I II III (~ III ^ Rescan Needed III II~III II II III III RES AN DIGITAL DATA OVERSIZED (Scannable) Color Items: Diskettes, No. ~ ^ Maps: ^ Greyscale Items: ^ Other, No/Type: ^ Other Items Scannable by a Large Scanner ^ Poor Quality Originals: OVERSIZED (Non-Scannable) ^ Other: ^ Logs of various kinds: NOTES: ^ Other.: BY: Mari Date: ~ ~ ~`' /s/ Project Proofing III II~III VIII II III BY: Maria Date: ~' /s/ Scanning Preparation ~ x 30 = ~ + ~ =TOTAL PAGES_~ (Count does not include cover sheet) BY: Maria '• Date: ~ / ~ /`7Cl' /s/ ~M Production Scanning Stage 1 Page Count from Scanned File: ~~ ~ (count does include cover sheet) Page Count Matches Number in Scanning Preparation: ~ YES _ BY: Maria Date: I Stage 7 If NO in stage 1, page(s) discrepancies were found: YES BY: Maria Date: Scanning is complete at this point unless rescanning is required. NO /s/ ~`~ NO "iiuimuimiuii ReScanned BY: Maria Date: /s! Comments about this file: o~,,,,~~,~k,a uummiumui 10/6/2005 Well History File Cover Page.doc STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMMISSII WELL COMPLETION OR RECOMPLETION REPORT AND LOG la. Well Status: ❑ Oil ❑ Gas ❑ SPLUG ❑ Other ® Abandoned ❑ Suspended 1b. Well Class: 20AAC 25.105 20AAC 25.110 ® Development ❑ Exploratory ❑ GINJ ❑ WINJ ❑ WAG ❑ WDSPL ❑ Other No. of Completions Zero ❑ Service ❑ Stratigraphic 2. Operator Name: 5. Date Comp., Susp., o f Aband.\ 12. Permit to Drill Nu ber: BP Exploration (Alaska) Inc. 1/29/2011 . 207 - 157 / 31/- 003 3. Address: 6. Date Spudded: 13. API Number: P.O. Box 196612, Anchorage, Alaska 99519 - 6612 11/9/2007 50 02921756 - 02 - 00 4a. Location of Well (Governmental Section): 7. Date T.D. Reached: 14. Well Name and Number: Surface: 12/3/2007 ,r PBU 18 -13B 1045' FNL, 371' FWL, SEC. 19, T11 N, R15E, UM 8. KB (ft above MSL): 54 15. Field / Pool(s): Top of Productive Horizon: 3111' FNL, 2914' FWL, SEC. 19, T11 N, R15E, UM GL (ft above MSL): Prudhoe Bay Field / Prudhoe Bay Total Depth: 9. Plug Back Depth (MD +TVD): Oil Pool _ 3751' FNL, 4514' FWL, SEC. 19, T11 N, R15E, UM 9301' 8375' 4b. Location of Well (State Base Plane Coordinates, NAD 27): 10. Total Depth (MD +TVD): 16. Property Designation: Surface: x 692133 y 5960832 Zone ASP4 11550' 8752' ADL 028321 TPI: x - 694728 y - 5958833 Zone ASP4 11. SSSV Depth (MD +TVD): 17. Land Use Permit: Total Depth: x- 696344 y- 5958234 Zone ASP4 N/A 18. Directional Survey: 181 Yes ❑ No 19. Water depth, if offshore: 20. Thickness of Permafrost (TVD): (Submit electronic and printed information per 20 AAC 25.050) N/A ft MSL 1900' (Approx.) 21. Logs Obtained (List all logs here and submit electronic and printed information per 20 AAC 25.071): 22. Re- Drill/Lateral Top Window MD/ VD: MWD DIR / GR, MCNL / GR / CCL 9202' 8316' 23. CASING, LINER AND CEMENTING RECORD SETTING DEPTH MD SETTING DEPTH TVD HOLE AMOUNT CASING WT. PER FT. GRADE TOP BOTTOM ToP BOTTOM SIZE CEMENTING RECORD : PULLED 20" 91.5# H-40 Surface 110' Surface 110' , 30" 1694# Poleset 13 -3/8" 72# / 68# K -55 / L -80 Surface 4482' Surface 4429' 17 -1/2" 3500 sx CS III, 600 sx 'G', Top Job: 100 sx CS II 9 -5/8" 47# L -80 Surface 9103' Surface 8263' 12 -1/4" 930 sx Class 'G' 7" 29# L -80 8805' 9202' 8087' 8316' 8 -1/2" 500 sx Class 'G' 4 -1/2" 12.6# L -80 8698' 9202' 8025' 8316' 6" 523 sx Class 'G' 3 -1/2° x 7i 33 a� a pax /1 s° x 2 8.81# 16.2# i L -80 8594' 11546' 7968' . 8752' 4-1/8" 141 sx Class 'G' - 24. Open to production or injection? ❑ Yes No 25. TUBING RECORD If Yes, list each interval open SIZE DEPTH SET (MD) PACKER SET (MD / TVD) (MD +TVD of Top & Bottom; Perforation Size and Number): 4-1/2", 12.6#, L -80 8718' 8548' / 7941' MD TVD MD TVD 8662' / 8005' pK, tat 1ps c .,./ 4fr `t No)' ,kP 26. ACID, FRACTURE, CEMENT SQUEEZE, ETC. 3/f( DEPTH INTERVAL (MD) AMOUNT AND KIND OF MATERIAL USED 9300' Set Whipstock ( c.✓( PKK SI � APR 2 8 2011 27. PRODUCTION TEST Date First Production: Method of Operation (Flowing, Gas Lift, etc.): Not on Production N/A Date of Test: Hours Tested: Production For OIL -BBL: GAS -MCF: WATER -BBL: CHOKE SIZE: GAS-OIL RATIO: Test Period 4 Flow Tubing Casing Press: Calculated OIL - BBL: GAS-MCF: WATER-BBL: OIL GRAVITY-API (CORR): Press. 24 -Hour Rate 28. CORE DATA Conventional Core(s) Acquired? ❑ Yes ® No Sidewall Core(s) Acquired? ❑ Yes 0 No If Yes to either question, list formations and intervals cored (MD +TVD of top and bottom of each), and summarize lithology and presence of oil, gas or water elf+ (submit separate sheets with this form, if needed). Submit detailed descriptions, core chips, photographs a f s per 20 AAC 250.071. None [j�E RBDMS MAR 2 12011 kt a�.ka MAR Oil & 6 s Cons Cor fission Form 10-407 Revised 12/2009 C TINUED O EVERSE y� -; (j,r8f Subm Original Only 29. GEOLOGIC MARKERS (List all formations and marke countered): 30. FATION TESTS NAME MD TVD Well Tested? ❑ Yes C No Permafrost Top If yes, list intervals and formations tested, briefly summarizing test Permafrost Base results. Attach separate sheets to this form, if needed, and submit detailed test information per 20 AAC 25.071. Sadlerochit / Zone 4A / 42SB 9289' 8367' None Top CGL 9363' 8420' Base CGL 9435' 8480' Zone 2B / 23SB 9503' 8539' 22TS 9540' 8570' Zone 2A / 21TS 9607' 8620' Zone 1B 9690' 8672' Zone 1A /TDF 9776' 8711' Formation at Total Depth (Name): Zone 1A / TDF 9776' 8711' 31. List of Attachments: Summary of Daily Drilling Reports, Well Schematic Diagram, Surveys 32. 1 hereby certify that the foregoing is true and correct to the best of my knowledge. �� i / / is / Signed: Terrie Hubble Title: Drilling Technologist Date: It PBU 18 -13B 207 -157 Prepared By NamelNumber. Terre Hubble, 564 -4628 Well Number Permit No. / Approval No. Drilling Engineer: Matthew Ross, 564 -4387 INSTRUCTIONS General: This form is designed for submitting a complete and correct well completion report and log on all types of lands and leases in Alaska. Submit a well schematic diagram with each 10-407 well completion report and 10-404 well sundry report when the downhole well design is changed. Item la: Classification of Service Wells: Gas Injection, Water Injection, Water - Altemating -Gas Injection, Salt Water Disposal, Water Supply for Injection, Observation, or Other. Multiple completion is defined as a well producing from more than one pool with production from each pool completely segregated. Each segregated pool is a completion. Item 4b: TPI (Top of Producing Interval). Item 8: The Kelly Bushing and Ground Level elevation in feet above mean sea level. Use same as reference for depth measurements given in other spaces on this form and in any attachments. Item 13: The API number reported to AOGCC must be 14 digits (ex: 50- 029 - 20123- 00 -00). Item 20: Report true vertical thickness of permafrost in Box 20. Provide MD and TVD for the top and base of permafrost in Box 28. Item 23: Attached supplemental records for this well should show the details of any multiple stage cementing and the location of the cementing tool. Item 24: If this well is completed for separate production from more than one interval (multiple completion), so state in item 1, and in item 23 show the producing intervals for only the interval reported in item 26. (Submit a separate form for each additional interval to be separately produced, showing the data pertinent to such interval). Item 27: Method of Operation: Flowing, Gas Lift, Rod Pump, Hydraulic Pump, Submersible, Water Injection, Gas Injection, Shut -In, or Other (explain). Item 28: Provide a listing of intervals cored and the corresponding formations, and a brief description in this box. Submit detailed description and analytical laboratory information required by 20 AAC 25.071. Item 30: Provide a listing of intervals tested and the corresponding formation, and a brief summary in this box. Submit detailed test and analytical laboratory information required by 20 AAC 25.071. Form 10-407 Revised 12/2009 Submit Original Only • • 18 -13B, Well History (Pre Rig Sidetrack) Date Summary 11/7/2010 WELL SHUT -IN ON ARRIVAL. INITIAL T /I /O = 2000/0/0 PSI. LOG SCMT IN 3.1875" AND 3.5" LINER FROM DEVIATION (9830') TO 8580'. TOC NOT FOUND IN LOGGED INTERVAL. FINAL T /I /O = VAC /0/0 PSI. JOB COMPLETE. DSO NOTIFIED OF DEPARTURE. 1/3/2011 WELL S/I ON ARRIVAL. ATTEMPT TO PULL 3.70" BAKER KB PACKER FROM 8551' SLM / 8572' MD. FWHP =0/0/0 1/4/2011 PULL 3.70" BAKER KB PACKER FROM 8551' SLM / 8572' MD. DRIFT W/ 20' x 2.70" DUMMY WHIPSTOCK TO 9177' SLM (unable to pass). DRIFT W/ 2.70" CENT, 3' x 1 7/8" STEM, 3 1/2" GR, 10' x 2.70" DUMMY WHIPSTOCK TO 9177' SLM (unable to pass due to dog leg). DRIFT W/ 2.70" CENT, S- BAILER TO 9821' SLM (stop due to deviation). FWHP= 1500/0/0 WELL LEFT S/I ON DEPARTURE, DSO NOTIFIED. 1/5/2011 WELL S/I ON ARRIVAL. 3 1/2" GR, 3 1/2" BAIT SUB, BAKER DUMMY WHIPSTOCK DRIFT TO 9500' SLM, TARGET DEPTH. FWHP= 2450/0/0/ WELL LEFT S/I ON DEPARTURE, DSO NOTIFIED. 1/7/2011 WELL FLOWING ON ARRIVAL. INITIAL T /I /O = 700/0/0 PSI AFTER TIE -IN ATTEMPTED TO SET BAKER WHIPSTOCK (TOW AT 217 DEGREES ORIENTATION) AT 9300'. PRIMARY IGNITOR FIRED AND GOOD INDICATION OF 1ST SETTING SEQUENCE. NO 2ND INDICATION DETECTED. WAITED 10 MINUTES AND THEN COULD NOT COME FREE OF WHIPSTOCK. WHIPSTOCK DID NOT FULLY SET AND SHEAR FREE FROM SETTING TOOL. WORK TOOL WITH NO SUCCESS. DECISION TO BREAK THE WEAK POINT WAS MADE AND NOW BLEEDING PRESSURE FROM 900 TO BELOW 400 PSI TO SAFELY POOH AFTER PULLING OUT OF WEAK POINT. CHANGE OUT CREW ARRIVES TO LOCATION TO CONTINUE JOB THE NEXT DAY. 1/8/2011 INITIAL T /I /O 900/0/0 PSI. CONTINUE STUCK IN HOLE. DECISION TO START THE INCREMENTS TO BREAK THE WEAK POINT WERE PUT ON HOLD TO LET LRS PUMP IN AND SEE IF AN INJECTION RATE CAN BE OBTAINED. A TOTAL OF 40 BBLS OF NEAT WERE PUMPED. LRS RELEASED FROM LOCATION AFTER FREEZE PROTECTING THE WELL. IN THE MEAN TIME, MONITORING WELL HEAD PRESSURE. FINAL T /I /O 900/0/0 PSI. 1/9/2011 INITIAL T /I /O 900/0/0 PSI. STUCK ON WELL AT 9273.5'. MONITOR PRESSURE AND GET READY TO BREAK WEAK POINT THE NEXT DAY. FINAL T /I /O 875/0/0 PSI. 1/10/2011 CONTINUE TOOLS STUCK IN HOLE. BLEED TUBING FROM 900 PSI TO 600 PSI. PULL 2700# (1300# OVER NORMAL), TOOLS COME FREE FROM WHIPSTOCK. BAKER 3- 3/16" KB PACKER WHIPSTOCK SET IN HOLE, TOP OF WHIPSTOCK AT 9300'. WHIPSTOCK PACKER AT 9307.3', 2 RA TAGS AT 9305'. ORIENTATION = 217 DEG., OAL 9.23' X 2.625" OD. ALL TOOLS RECOVERED FROM WELL. FINIAL T /I /O = 850/0/0 WELL SHUT -IN ON DEPARTURE, DSO NOTIFIED. JOB COMPLETE. Page 1 of 1 • • 18 -13B, Operations Summary From To Operation Summary 1/27/11 12:00 AM 1/27/11 8:00 AM WARM UP MOVING SYSTEM AND PREPARE TO MOVE RIG OVER 18 -13C WHEN WELL PREP IS COMPLETED. 1/27/11 8:00 AM 1/27/11 10:00 AM MOVE RIG ONTO 18 -13C. POSITION RIG OVER WELL. RIG ACCEPT AT 1000 HRS. 1/27/11 10:00 AM 1/27/11 3:30 PM PREPARE RIG FOR OPERATIONS. STAGE EQUIPMENT, CONNECT LINES. LOCK OUT TAG OUT WELL 18 -15 BY DRILL SITE OPERATOR AND NORDIC 1 WSL. NU BOP. 1/27/11 3:30 PM 1/27/11 4:30 PM CONDUCT PRE -SPUD MEETING WITH DAY CREW 1/27/11 4:30 PM 1/27/11 5:15 PM CONDUCT RIG EVACUATION DRILL AND CONDUCT AAR AFTERWARDS 1/27/11 5:15 PM 1/27/11 6:00 PM CLEAR RIG FLOOR, MOBILIZE BOP TEST EQUIPMENT TO FLOOR 1/27/11 6:00 PM 1/27/11 7:00 PM MU BOP TEST EQUIPMENT. BODY TEST STACK TO LOOK FOR LEAKS. 1/27/11 7:00 PM 1/27/11 7:30 PM PRE -SPUD WITH NIGHT CREW WHILE WAITING ON AOGCC REP 1/27/11 7:30 PM 1/28/11 12:00 AM BOP TEST WITH 2" AND 2 3/8" TEST JOINTS TO 250 PSI LOW AND 3500 PSI HIGH. AOGCC REP JOHN CRISP ON p SITE TO WITNESS TEST. WSL ROB O'NEAL AND 0 TOURPUSHER TOM KILFOYLE WITNESSED TEST. TIGER r TANK STAGED, HARD LINE RIGGED UP AND TESTED TO 4000 PSI. 1/28/11 12:00 AM 1/28/11 5:30 AM BOP TEST WITH 2" AND 2 3/8" TEST JOINTS TO 250 PSI LOW AND 3500 PSI HIGH. AOGCC REP JOHN CRISP ON SITE TO WITNESS TEST. WSL ROB O'NEAL AND TOOLPUSHER TOM KILFOYLE WITHNESSED TEST. 1/28/11 5:30 AM 1/28/11 6:00 AM CONDUCT RIG EVACUATION DRILL -ALL HANDS ACCOUNTED FOR AT SATELITE CAMP INCLUDING TRUCK DRIVER. - CONDUCT AAR: NOTE AREAS OF IMPROVMENT. - DRILL WAS CONDUCTED AT CREW CHANGE, COULD DO BETTER JOB OF INFORMING INCOMING CREWS. - RESPONSE TIME WAS GOOD. 1/28/11 6:00 AM 1/28/11 9:45 AM NORDIC ELECTRICIAN CALIBRATES GAS ALARMS. SLB HOLDS PJSM FOR SLACK MANAGEMENT. REVIEW SLACK MANAGEMENT PRE - LOADED IN REEL - 2.7 %. CALL SLB CELL LEADER, THIS IS SUFFICIENT SLACK. 1/28/11 9:45 AM 1/28/11 10:30 AM CUT CIL BACK. HEAD UP BHA. TEST ELINE 54 OHMS. 1/28/11 10:30 AM 1/28/11 11:00 AM PULL TEST TO 25K LB. GOOD. MU BAKER UQC (NO CHECKS). 1/28/11 11:00 AM 1/28/11 11:45 AM FILL CT W/ KCL. 1/28/11 11:45 AM 1/28/11 12:00 PM PT CTC AND INNER REEL IRON TO 200 PSI LOW / 4000 PSI HIGH. GOOD. 1/28/11 12:00 PM 1/28/11 1:00 PM MU TO WELL. TEST INNER REEL VALVE AND PACKOFF TO 200 PSI / / 3500 PSI, GOOD. PUMP SLACK FORWARD. UNSTAB. FIND -8" PIECE OF 5/16" ELINE INUQC BODY. INFORM ODE. 1/28/11 1:00 PM 1/28/11 1:30 PM INSTALL BAKER CHECKS IN UQC AND TEST, GOOD. 1/28/11 1:30 PM 1/28/11 3:30 PM PU AND RU VALVE SHOP LUBRICATOR. 1/28/11 3:30 PM 1/28/11 4:00 PM PJSM FOR PULLING TWC W/ PRESSURE BENEATH. Page 1 of 3 • • 18 -13B, Operations Summary From To Operation Summary 1/28/11 4:00 PM 1/28/11 5:00 PM FULL TWC. SIWHP 1350 PSI. ISOLATE WELL W/ MASTER SSV. LD VALVE SHOP LUBRICATOR. 1/28/11 5:00 PM 1/28/11 6:00 PM STAB ON NOZZLE. PRESSURE TEST LUBRICATOR AGAINST SWAB VALVE. LIQUID PACK STACK AND TIGER TANK HARD LINE WITH NEAT METHANE. PUMP 25 BBLS NEAT METHANE INTO COIL, FOLLOW IWTH 2% KCL TO PLACE METHANE AT NOZZLE. 1/28/11 6:00 PM 1/28/11 6:45 PM PJSM ON RIH, DISPLACING FLUID, HANGING RETURNS. STAGE PERSONNEL, MAKE CHECKS ON BOP, TREE AND HARDLINE TO TIGER TANK. 1/28/11 6:45 PM 1/28/11 7:30 PM MAINTAIN 1350 PSI ON BOP STACK AGAINST CHOKE. OPEN WELL. NO ISSUES. 1350 PSI FROM WELL. RIH WITH NOZZLE ASSEMBLY AGAINST CLOSED CHOKE. 1/28/11 7:30 PM 1/28/11 9:15 PM RIH WITH NOZZLE ASSEMBLY PUMPING AT .2 BPM. MAINTAIN CLOSED CHOKE. SLOW PUMP RATE TO .1 BPM DUE TO NO PRESSURE BUILDUP; WANT TO ENSURE METHANE WILL BE IN NOZZLE AT WHIPSTOCK. -WHP INCREASE AT 2000'. CONTINUE TO HOLD CHOKE UNTIL WHIP REACHES 1540 PSI. MONITOR AND ADJUST CHOKE TO MAINTAIN APPROXIMATELY 1500 -1560 PSI WHILE RUNNING IN HOLE AT 80 -90 FPM, .1 BPM. - INCREASE IN RATE TO .25 BPM, MAINTAIN 1510 -1560 PSI WHILE RIH AT 90 FPM. - DECREASE RIH RATE AT 9200'. TAG AT 9303'. PU, RE -TAG AT 9303'. - WEIGHT CHECKS GOOD THROUGHOUT RIH. -SIWHP AT TAG 1590 PSI -SET DOWN 2000LBS ON WHIPSTOCK, NO MOVEMENT. 1/28/11 9:15 PM 1/28/11 10:40 PM BEGIN DISPLACMENT WITH 8.4 PPG 2% KCL AT 2 BPM, 2720 PSI CIRC PRESSURE, 1570 SIWHP. MAINTAIN PUMP AND PRESSURE SCHEDULE ACCORDING TO PLAN ADDENDUM. - 5 BBLS AWAY, 1490 PSI SIWHP -15 BBLS AWAY, 1400 PSI - 25 BBLS AWAY, 1250 PSI -30 BBLS AWAY, 1170 PSI -40 BBLS AWAY, 1050 PSI -45 BBLS AWAY, 1000 PSI -55 BLLS AWAY, 910 PSI -60 BBLS AWAY, 860 PSI -70 BBLS AWAY, 700 PSI - 75 BBLS AWAY, 650 PSI -85 BBLS AWAY, 570 PSI -90 BBLS AWAY, 490 PSI -100 BBLS AWAY, 400 PSI -110 BBLS AWAY, 300 PSI -120 BBLS AWAY, 150 PSI FINAL CIRCULATING PRESSURE AT 2 BPM AT 2470 PSI WITH 150 PSI WHP. CONTINUE DISPLACING WELL WITH 2% KCL TO CLEAN UP RESIDUE, ENSURE ALL KCL ALL THE WAY AROUND. 1/28/11 10:40 PM 1/29/11 12:00 AM FLOW CHECK WELL. STATIC. SWITCH TO 8.6 PPG MUD AND DISPLACE AT IN AND OUR RATES OF 2 BPM, ICP 3440 PSI, MW IN 8.6 PPG, MW OUT 8.4 PPG. -MUD ALL THE WAY AROUND. FCP AT 3830 PSI, MW IN AND OUT 8.6 PPG. IN AND OUT RATES 2 BPM. BEGIN FOLW CHECK ON WELL. 1/29/11 12:00 AM 1/29/11 1:15 AM FLOW CHECK WELL. STATIC. JOLE FULL AFTER FLOW CHECK. COMPLETE TAKING ON 8.6 PPG MUD INTO PITS WHIL PECIPROCATING. Page 2 of 3 • 18 -13B, Operations Summary From To Operation Summary 1/29/11 1:15 AM 1/29/11 3:00 AM POH WITH NOZZLE BHA. NO P ROBLEMS WITH DISPLACEMENTS. CONDUCT AAR ON DISPLACEMENT WHILE POH. PJSM ON LD NOZZLE BHA, MU MILLING BHA. 1/29/11 3:00 AM 1/29/11 4:30 AM LD NOZZLE BHA. MU 2.74" MILLING BHA. DID NOT RUN CENTRALIZER ON BHA. VERIFY SECURITY, RE -ALIGN STRAPS SECURING HEARD LINE IN REEL HOUSE. 1/29/11 4:30 AM 1/29/11 7:30 AM RIG W/ WINDOW MILLING ASSEMBLY. 80 FT /MIN. 1/29/11 7:30 AM 1/29/11 8:15 AM LOG TIE -IN. CORRECTION OF ( +5.5'). DRY TAG WHIPSTOCK AT 9300' MD. STACK 2K LB ON WS, NO MOVEMENT. PU CLEAN UP 9298' MD AT 24K LB. PAINT WHITE FLAG AT 9288' MD (CTDS DEPTH, END OF BIT) 1/29/11 8:15 AM 1/29/11 11:30 AM FREESPIN 1.55BPM AT 3575 PSI W/ FULL RETURNS. ENGAGE AT 9301' MD. 200 PSI MOTOR WORK, 200 LB DHWOB. AFTER -2 MINUTES, SEE SUDDEN LOSSES (0.25 BPM LOSSES AT 1.55 BPM PUMP RATE). NO CHANGE IN MOTOR WORK OR DHWOB W/ LOSSES. LOSSES SLOWLY HEAL AFTER - 10 MINUTES, -2BBLS TOTAL LOST. CALL SLOPE SUPT - PICK UP OFF WHIPSTOCK AND RETAG TO CONFIRM THAT IT HAS NOT STARTED TO MOVE WITH THE TORQUE WE APPLIED WHEN ENGAGING CASING W/ MILL. TAG WHIPSTOCK W/ 3200 LB DHWOB. NO MOVEMENT. RESUME MILLING OPERATIONS FROM 9301' MD. TIME MILLING AHEAD AT 3780 PSI AT 1.57 BPM (FREESPIN 3580 PSI) W/ FULL RETURNS. BHWOB - 1600 LB. BHP /PVT /ECD: 4128 PSI / 334BBL / 8.63 PPG. IAP: 400 PSI. OAP: 0 PSI. MM IN DENSITY IS 8.6 PPG - ECD SEEMS LOW. FIND THAT BAKER DOES NOT HAVE ACCURATE SURVEY DATA INPUT N IA) INTO THEIR ALOGRITHM. HAVE BAKER FIX PROBLEM. ECD = 9.6PPG. ( Tv Page 3 of 3 WELLHEAD`= 11' FMC * ** 4-1/2"At FOME TBG * *` ORIGINAL, "A" & "B" ACTUATOR = BAKER C PJC DRAM WELLBW NOT SHOWN BELOW WHIPSTOCK'S * ** KB. ELEV = 48' I BF. ELEV = .-. KOP = 3450' 2110' H4-1/2" HES X NIP, ID = 3.813" I Max Angle = 96° @ 12650' 20" CONDUCTOR, 110' GAS LIFT MANDRELS Datum MD = N/A ID = ? ST MD TVD DEV TYPE VLV LTCH PORT DATE Datum TV D = 8800' SS 3 3009 3008 6 MMG DOME RK 16 02/28/11 13 -3/8" CSG, 68 #, K -55 BUTT, ID = 12.415" I-1 111' 2 6225 6009 25 MMG SO RK 20 02/28/11 1)1 1 8479 7902 55 MMG DMY RK 0 10/13/07 113 -3/8" CSG, 72 #, L -80 BUTT , ID = 12.347" I-I 4482' - ' 8518' H4 -1/2" HES X NIP, ID = 3.813" I 2 -3/8" KB LINER TOP PKR, ID = 2.36" I 8524' _ in 3.70" BKR DEPLOY SLEEVE, ID = 3.00" H 8540' J Ar X 8548' H 9 -5/8" X 4-1/2" BKR S -3 PKR, ID = 3.875" I 2.70" BTT DEPLOY SLEEVE, ID = 1.78" H 8456' I 1 ( 8583' I- I4 -1/2" HES X NIP, ID = 3.813" (BEHIND CT LNR) Minimum ID = 1.78" @ 8546' I 8594' H3.70" DEPLOY SLV, ID = 3.00" I 2.70" BTT DEPLOY SLEEVE 8604' 1H 3 -1/2" HOWCO X NIP, ID = 2.81" 1 4 -1/2" TBG, 12.5 #, 13CR -80 VAMTOP, -1 8635' .0152 bpf, ID = 3.958" 886 (614' 1 "I=4 -9 1/5!8" X 2" HES 4 -112 X/ N IP, IDI = UNIQUE 3.813" I OVERSHOT 14-1/2" TBG STUB (11/03/07) I--I 8632' Ial 8662' 1-19 -5/8" X 4-1/2" BKR S -3 PKR, ID = 3.875" I 9 -5/8" X 7" BKR ZXP LTP w / 6' TIEBK SLV -I 8698' 8696' I-I 4-1/2" HES X NIP, ID = 3.813" I BEHIND & HMC LNR HGR, ID = 6.250" _ 8718' H4-1/2" WLEG, ID = 3.958" 1 CT LNR 4 -1/2" TBG, 12.6# L -80 IBT, .0152 bpf, ID = 3.958" H 8718' 8718' 7" X 4-1/2" XO, ID = 3.938" I L ----1 8805' j 10' TIW TIEACK SLV w / 9-5/8" X 7" LNR HGR ID = ? 9 -5/8" CSG, 47 #, L -80 BUTT, ID = 8.681" I-I 9103' • 13-1/2" LNR, 9.2 #, L -80 STL, .0087 bpf, ID = 2.992" H 9142' 4 -1/2" LNR, 12.6 #, L -80 IBT, .0152 bpf, ID = 3.958" I--I -9202 / --I 9142' I- -13 -1/2" X 3- 3/16" XO, ID = 2.786" I 17" LNR, 29 #, L -80 BTC, .0371 bpf, ID = 6.184" H -9202 I4 -1/2" MONOBORE WHIPSTOCK (11/08/07) H 9202' MILLOUT WINDOW (18 -13B) 9202' - 9211' 3- 3/16" BKR WHIPSTOCK (01/10/11) -I 9300' likir w/ 2 RA TAGS @ 9305' 3- 3/16" MILLOUT WINDOW (18 -13C) 9300' - 9306' 3- 3/16" LNR, 6.2 #, -80 TCHI, .0076 bpf, ID = 2.80 -9306 PERFORATION SUMMARY _ REF LOG: MCNL GR ON 02/10/11 s ANGLE AT TOP PERF: 86° @ 11210' ` Note: Refer to Production DB for historical pert data ` SIZE SPF INTERVAL Opn /Sqz DATE ` 1.56" 6 11210 - 11530 0 02/12/11 1.56" 6 11590 - 11650 0 02/12/11 ` id d 45 C 1.56" 6 11710 - 11880 0 02/12/11 1.56" 6 11960 - 12330 0 02/12/11 I PBTD H 12605' I i� :� 1.56" 6 12450 - 12600 0 02/12/11 2 -3/8" LNR, 4.7 #, L -80 STL, 12641' -1 3 v .0039 bpf, ID = 1.995" DATE REV BY COMMENTS DATE REV BY COMMENTS PRUDHOE BAY UNIT 12/06/87 ROWAN 41 ORIGINAL COMPLETION 03/04/11 JLJ /PJC GLV C/O (02/28/11) WELL: 18 -13C 02/25/98 09 SIDETRACK (18 -13A) 03/09/11 TH/PJC WHIPSTOCK CORRECTION PERMIT No: 2101860 01/14/07 D16 RWO API No: 50- 029 - 21756 -03 12/09/07 NORDIC 2 CTD SIDETRACK (18 -13B) SEC 19, T11 N, R15E, 1045' FNL & 371' FWL 02/13/11 NORDIC 1 CTD SIDETRACK (18 -13C) 03/04/11 PJC DRLG DRAFT CORRECTIONS BP Exploration (Alaska) ` • • sTsEll 0[F Alas-/;-=\\ SEAN PARNELL, GOVERNOR ALASKA OIL AND GAS 333 W. 7th AVENUE, SUITE 100 CONSERVATION COMMISSION ANCHORAGE, ALASKA 99501 -3539 PHONE (907) 279 -1433 FAX (907) 276 -7542 John McMullen Engineering Team Leader Q07- BP Exploration (Alaska), Inc. P.O. Box 196612 Anchorage, AK 99519 -6612 Re: Prudhoe Bay Field, Prudhoe Bay Oil Pool, PBU 18 -13B Sundry Number: 310 -427 Dear Mr. McMullen: N D DE: 8 2010 Enclosed is the approved Application for Sundry Approval relating to the above referenced well. Please note the conditions of approval set out in the enclosed form. As provided in AS 31.05.080, within 20 days after written notice of this decision, or such further time as the Commission grants for good cause shown, a person affected by it may file with the Commission an application for reconsideration. A request for reconsideration is considered timely if it is received by 4:30 PM on the 23rd day following the date of this letter, or the next working day if the 23rd day falls on a holiday or weekend. Sincerely, Dan T. Seamount, Jr. Chair DATED this day of December, 2010. Encl. STATE OF ALASKA op �Z ? '« �y r�I' ALASKF�. AND GAS CONSERVATION COMMIS t� �" APPLICATION FOR SUNDRY APPROVAL DEC 1 6 2010 20 AAC 25.280 1. Type of Request: 4163ka loll di tin irons. uommi8310?P ❑ Abandon ® Plug for Redrill • ❑ Perforate New Pool ❑ Repair Well ❑ Change Approved Prog di&)Orage ❑ Suspend ❑ Plug Perforations ❑ Perforate ❑ Pull Tubing ❑ Time Extension ❑ Operations Shutdown ❑ Re -Enter Suspended Well ❑ Stimulate ❑ Alter Casing ❑ Other 2. Operator Name: 4. Current Well Class: 5. Permit To Drill Number BP Exploration (Alaska) Inc. ® Development. ❑ Exploratory 207 -157 3. Address: ❑ Service ❑ Stratigraphic 6. API Number: P.O. Box 196612, Anchorage, Alaska 99519 -6612 50 02921756 - 02 - 00 - 7. If perforating, closest approach in pool(s) opened by this operation to nearest 8. Well Name and Number: property line where ownership or landownership changes: PBU 18 -13B - Spacing Exception Required? ❑ Yes ® No 9. Property Designation: 10. Field / Pool(s): ADL 028321 ' Prudhoe Bay Field / Prudhoe Bay Oil Pool 11. PRESENT WELL CONDITION SUMMARY Total Depth MD (ft): Total Depth TVD (ft): Effective Depth MD (ft): Effective Depth TVD (ft): Plugs (measured): Junk (measured): 11550' • 8752' - 11509' - 8752' - 10450' None Casino Length Size MD TVD Burst Collapse Structural Conductor Surface 110' 20" 110' 110' 1490 470 Intermediate 4482' 13 -3/8" 4482' 4429' 3700 2230 Production 9103' 9-5/8" 9103' 8263' 6870 4760 Liner 942' 7" 8805' - 9202' 8087' - 8316' 8160 7020 Liner 4399' 4 -1/2" 8698' - 9202' , 8025' - 8316' 8430 7500 Liner 2974' 3 - 1/2 "x3 3/16 "x2 - 7/8" 8572' - 11546' 7954' - 8752' 13450 13890 Perforation Depth MD (ft): Perforation Depth TVD (ft): Tubing Size: Tubing Grade: Tubing MD (ft): 10160' - 10310' 8736' - 8738' 4-1/2", 12.6# L -80 8718' Below Plua 10580' - 11510' Below Plua 8743' - 8752' Packers and SSSV Type: 9 -5/8" x 4 BKR S - Packer Packers and SSSV 8548' / 7941' 9 - 5/8" x 4 BKR S - 3 Packer MD (ft) and TVD (ft): 8662' / 8005' 12. Attachments: 13. Well Class after proposed work: ® Description Summary of Proposal ® BOP Sketch ❑ Detailed Operations Program ❑ Exploratory - ® Development ❑ Service 14. Estimated Date for 15. Well Status after proposed work: Commencing Operations: December 27, 2010 ❑ 011 ❑ WINJ ❑ WDSPL ❑ Plugged 16. Verbal Approval: Date: ❑ Gas ❑ GINJ ❑ GSTOR ❑ Abandoned ❑ WAG ❑ SPLUG - ® Suspended Commission Representative: 17. I hereby certify that the for • oing is true and correct to the best of my knowledge. Contact Matthew Ross, 564 -4387 Printed Name Joh,# Lf en Title Engineering Team Leader Prepared By Name/Number Signature ' ' Phone 564 - 4711 Date / ? /13.4/6 Elizabeth Barker, 564 -4628 s Commission Use Only Conditions of approval: Notify Commission so that a representative may witness Sundry Number j 0 —Ct al ❑ Plug Integrity ,BOP Test ❑ Mechanical Inte Test ❑ Location Clearance • x` ©O ps. 13oe - f / Other: Z�aa /as L A.n „k 1�r /es f” (,r"'w ^� d \ Ai ,�- 't, p+ u p!Q Gr.. emi tt-o,p i'a�J c-aC re / [ 4G Z S� /Z J Subsequent Form Required: / a 9 0 T / APPROVED BY 12-7 f1 t� Approved B , COMMISSIONER THE COMMISSION Date !(!! Form 10-403 R= i - 4"' `1 i' , s DEC , 8 ZO /�-, ORIGINAL �2 zD �U S ubmit In Duplicate C - "` J-�- d • • To: Alaska Oil & Gas Conservation Commission bp From: Matthew Ross CTD Engineer Date: December 6, 2010 Re: 18 -13B Sundry Approval Sundry approval is requested to plug the 18 -13B perforations as part of drilling the 18 -13C coiled tubing sidetrack. History of 18 -13B. 18 -13B is a 2007 horizontal CST in Zone 1A in the Ivishak. After drilling three plugbacks, the well was finally completed in an area very close to a well with high offtake. The well was brought online in Feb 2008 and started to cycle immediately and the gas rate peaked after the well's first cycle. A Spinner- Temp -Press log was run over the liner lap region in March 2008. It indicated the liner top was not leaking. In May 2008, STP/MCNL/Borax logs were performed to diagnose the source of gas production in 18- 13B, but no channels were identified and no significant point- source entry of gas was found. In Aug 2008, a CIBP was set over 930' of the lower perfs at 10,540' leaving 150' of the upper perfs open. The CIBP was not successful in reducing the gas but did reduce the oil, and the well was once again shut -in for high GOR. The well has been brought online twice in the last two years with high GOR. The well showed no ability to cycle and remains shut -in for high GOR. Due to low remaining value, 18 -13B was screened for a CST in May 2010. Reason for sidetrack. 18 -13A is currently SI for high GOR with no remaining wellwork options. The V proposed sidetrack will access reserves in the south eastern portion of the Ivishak. Proposed plan for 18 -13C is to drill a thru- tubing sidetrack with a Coiled Tubing Drilling rig on or around January 10, 2011. The existing perforations will be isolated by the primary cement job. The following describes work planned and is submitted as an attachment to Form 10 -403. A schematic diagram of the proposed sidetrack is attached for reference. j orate. W ea Ao 0�1� Pre -Rig Work: (scheduled to begin December 27, 2010). P for A 4-fr( 1. S Pull LTP at 8572' MD. and K /S ®� dad 60 2. S Dummy WS drift to 9500' MD. Drift 4 -1/2" to TOL at 8594' MD for new LTP. iv, 004 5*T, 3. F Load & kill well prior to setting WS. Freeze protect well to 2000' MD. 4. E Set 3- 3/16" Packer WS at 9300' MD. !21217/0 5. V PT MV, SV, WV. 6. D Bleed gas lift and production flowlines down to zero and blind flange. 7. 0 Remove wellhouse, level pad. 8. V Set TWC —24hr prior to rig arrival. p , n 1 �` Rig Work: (scheduled to begin on January 10, 2011) 18-130 1. MIRU and test BOPE to 250 psi low and 3500 psi high. Pull TWC. 2. Mill 2.74" window at 9300' MD and 10' of rathole. 3. Drill Build: 3.0" OH, 630' (15° /100). 4. Drill Lateral: 3.0" OH, 2470' (12° /100). A/e4.) PTJ> 5. Run 2 -3/8" solid cemented completion leaving TOL at 8570' MD. 6. Pump primary cement leaving TOC at 9200', 12.6 bbls of 15.8 ppg liner cmt planned. 7. Cleanout run. 8. Run MCNL /GR/CCL log. • • 9. Perforate 1300ft. 10. Run 4 -1/2" liner top packer and test liner lap to 2,400 psi. 11. Freeze protect well, set BPV and RDMO. Post -Rig Work: 1. Re- install wellhouse and FL's. 2. Run generic GLV's. 3. ASRC flowback. Matthew Ross CTD Engineer 564 -4387 CC: Well File Sondra Stewman/Terrie Hubble it • TREE H 4-1/16" FMC CNV WELLHEAD = 111' • 18-13B SAFETY AL: WELL ANGLE >70° @9786' ACTUATOR = BAKER C '4-1/2" CHROME TBG*** KB. ELEV = 54.8' v I BF. ELEV = KOP = 3450' I 2110' 1-14-1/2" HES X NIP, ID = 3.813" I Max Angle = 94° © 12441' 20" CONDUCTOR, -I 110' GAS LIFT MANDRELS Datum MD = WA ID = ? Datum TVD = 8800' SS ST MD TVD DEV TYPE VLV LTC- PORT DATE • 3 3009 3008 6 MMG DMY RK 0 10/09/10 13 -3/8" CSG, 68 #, K -55 BUTT, ID = 12.415" H 111' 2 6225 6009 25 MMG DMY RK 0 10/09/10 1 8479 7902 55 MMG DMY RK 0 10/13/07 1 13 -3/8" CSG, 72 #, L -80 BUTT , ID = 12.347" I-I 4482' 1 8518' 1 -14 -1/2" HES X NIP, ID= 3.813" 1 ►ZI ►mot 8548' H9-5/8" X 4-1/2" BKR S -3 PKR, ID = 3.875" I Minimum ID = 2.377" @ 9942' 11 ill 8572' H3.70" 45 HYDRAULIC KB PKR, ID = 2.56" 1 3- 3/16" X 2 -7 /8" XO ` 8579' '--12-7/8" SPACER PIPEw / SEAL ASSY, ID = 2.38" I 8583' H4 -1/2" HES X NIP, ID = 3.813" (BEHIND CT LNR) I ' 8594' H 3.70" DEPLOY SLV, ID = 3.00" I 4 -1 /2" TBG, 12.5 #, 13CR -80 VA M TOP, 8635' I, 8604' 1-13-1/2" HOWCO X NIP, ID = 2.81" I .0152 bpf, ID = 3.958" I4 -1/2" TBG STUB (11!03/07) H 8632' 8614' -14 -1/2" HES X NIP, ID= 3.813" 1 ► ►.t 8644' H9-5/8" X 4-1/2" UNIQUE OVERSHOT 1 BKR 6' TIEBACK SLV, ID = 7.500" H 8698' , 8662' H9-5/8" X 4-1/2" BKR S -3 PKR, ID = 3.875" 1 19 -5/8" X 7" BKR ZXP LTP, ID = 6.313" H 8705' 8696' 1-14-1/2" HES X NIP, ID = 3.813" I BEHIND 0 " 9 -5/8" X 7" BKR HMC LNR HGR, ID = 6.250" H 8 7 1 1 ' ii ■ 8718' H4 -1/2" WLEG, ID= 3.958" I CT LNR 14 -1/2" TBG, 12.6# L -80 IBT, .0152 bpf, ID = 3.958" 1-1 8718' 8718' I -17" X 4 -1/2" XO, ID = 3.938" I 110' TM/ TIEBACK SLV, ID = ? H 8805' 19 -5/8" X 7" WV LNR HGR, ID = ? H 8815' 1 9 -5/8" CSG, 47 #, L -80 BUTT, ID = 8.681" 1-j 9103' 1 9142' 1-13-1/2" X 3- 3/16" XO, ID = 2.786"1 13 -1/2" LNR, 9.2 #, L -80 STL, .0087 bpf, ID = 2.992" H 9142' ' / 7" MILLOUT WINDOW (18 -13B) 9202' - 9211' I4 -1/2" MONOBOREWHIPSTOCK (11 /08/07) H 9202' ,p IRA TAG H 9211' II 1 9942' H 3- 3/16" X 2 -7/8" XO, ID = 2.377" I (FISH - WHIPSTOCK DEBRIS (11/06/07) I 9233' ' / 10460' - 12 -7/8" GBP (08/07/08) PERFORATION SUMMARY i i3 6° REF LOG: MCNL GR ON 12/05/07 \ / / ` 1 g-- i 3 B ANGLE AT TOP PERF: 87° @ 10160' D Note: Refer to Production DB for historical pert data 3- 3/16" LNR, 6.2 #, --I 9942' 1 * .� SIZE SPF INTERVAL Opn /Sqz DATE TCII STL, .0076 bpf, '` * • 2" 6 10160 - 10310 0 12/07/07 5 •' ID = 2.80" 1 pBTD I 11510' 2" 6 10580 - 11510 C 12/07/07 ( ■ • 2 -7/8" LNR, 6.16#, L -80 STL, --I 11546' 1 17" LNR, 29#, L -80 BTC, .0371 bpf, ID = 6.184" 1-J 10277' 1 .... 0058 bpf, ID = 2.441" .•.•.•.•; �3 1 4 -1/2" LNR, 12.6 #, L -80 IBT, .0152 bpf, ID= 3.958" H 13097' DATE REV BY COMMENTS DATE REV BY COMMENTS PRUDHOE BAY UNIT 12/06 /87 ROWAN 41 ORIGINAL COMPLETION 09/05/08 JKC/PJC SET GBP (08/07/08) WELL: 18 -13B 02/25/98 D9 SIDETRACK (18 -13A) 10/09/10 RCT /AGR GLV GO (10/09/10) PERMIT No: `071570 01/14/07 D16 RWO API No: 50- 029 - 21756 -02 12/09 /07 NORDIC 2 CTD SIDETRACK (18 -13B) SEC 19, T11 N, R15E, 1045' FNL & 371' FWL 01/15/08 GJF /PJC GLV C/O (01/07/08) 04/13/08 LBS /PJC DRLG DRAFT CORRECTIONS BP Exploration (Alaska) TREE =, • 4-1/16" CM/ 18 -13 C WELLHEAD = 11' FMC SAFETY S: WELL ANGLE > 70° 9786' ACTUATOR = BAKER proposed CTD Sidetrack * * *4 -112" OMETBG* ** KB. ELEV = 54.8' BF. ELEV = KOP = 3450' _.� 2110' --I4 -1/2" HES X NIP, ID = 3.813" Max Angle = 94 © 12441' 20" CONDUCTOR, H 110' — -- - GA S LIFT MA NDRELS Datum MD = N/A ID = ? ST MD TVD DEV TYPE VLV LTCH PORT DATE Datum TVD = 8800' SS 3 3009 3008 6 ft/MG DMY RK 0 10/09/10 13 -3/8" CSG, 68 #, K -55 BUTT, ID = 12.415" — 111' ' 2 6225 6009 25 MMG DMl' RK 0 10/09/10 1 8479 7902 55 MMG DMY RK 0 10/13/07 13 -3/8" CSG, 72 #, L -80 BUTT , ID = 12.347" H 4482' I 8518' —14 -1/2" HES X NIP, ID = 3.813" I4 -112" x 2-3/8" KB LTP H 8560' - I 8548' H9 - 5/8" X 4 -1/2" BKR S -3 PKR, ID = 3.875" . [Top of Proposed 2 -3 18" Liner H 8570' I I I. 8572' H3.70" KB PKR, ID = 2.56" to be pulled 1 8579' H ? -79 SPACER hr? SEA'_ A.SSY. Minimum ID = 1.75 ?" @ 8560' ` 8583 8594' — 4 -1/2" HES X NIP, ID = 3.813" (BEHIND CT LNR) 2 -3/8" KB II — — — 3.70 DEPLOY SLV, ID = 3.00" 4 -1/2" TBG, 12.5 #, 13CR -80 VAM TOP, — 8635' 8604' H3-1/2" HOWCO X NIP, ID = 2.81" .0152 bpf, ID = 3.958" 7< lirql I 8662' H9 -5/8" X 4 -1/2" BKR S -3 PKR, ID = 3.875" BEHIND CT LNR 4 -1/2" TBG, 12.6# L -80 IBT, .0152 bpf, ID= 3.958" — 8718' --------4 A TS G R 8996' ® 9200' I I - ?P of Cement 9 -5/8" CSG, 47 #, L -80 BUTT, ID = 8.681" H 9103' [--J / 9142' — I 3 -1/2" X 3- 3/16" XO, ID = 2.786" 3 -1/2" LNR, 9.2 #, L -80 STL, -0087 bpf, ID = 2.992" —I 9142' 1 7" MILLOUT WINDOW (18 - 13B) 9202' - 9211' RA TAG H 9211' 3- 3/16" LNR, 6.2 #, 9942' 7" LNR, 29#, L -80 BTC, .0371 bpf, ID = 6.184" H 10277' 1\ j TCII STL, .0076 bpf, ��dDaW - 13A) r,., 18 1 ID= 2.80" A / 1 2-3/8' L -80 LINER, Cemented & P^ _ted — 1 - 1 PERFORATION SUMMARY REF LOG: MCNL GR ON 12/05/07 - I 9300' —I okr w hipstock ANGLE AT TOP PERF: 87° @ 10160' Note: Refer to Production DB for historical perf data SIZE SPF INTERVAL Opn /Sqz DATE - - - -- 2" 6 10160 - 10310 0 12/07/07 I 9942' —I3- 3/16" X 2 -7/8" XO, ID = 2.377" 2" 6 10580 - 11510 12/07/07 3TD — 12360' m_ - 10450' — - 7/8" CIBP (08/07/08) [' 4 o 2 -7/8" LNR, 6.16 #, L -80 STL, H 11546' 4 -1/2" LNR, 12.6 #, L -80 IBT, .0152 bpf, ID = 3.958" —I 13097' t . 0058 bpf, ID = 2.441" DATE REV BY COMMENTS DATE REV BY COMMENTS PRUDHOE BAY UNIT 12/06/87 ROWAN 41 ORIGINAL COMPLETION 09/05/08 JKCIPJC SET CIBP (08/07/08) WELL 18 -13 02/25/98 D9 SIDETRACK (18 - 13A) 10/09/10 RCT /AGR GLV C/O (10/09/10) PERMIT No: 01/14/07 D16 RWO 11/12/10 MSE PROPOSED CTD SIDETRACK API No: 50- 029 - 21756 -0 12/09 /07 NORDIC 2 CTD SIDETRACK (18 - 13B) SEC 19, T11 N, R15E, 1045' FNL & 371' FWL 01/15/08 GJF /PJC GLV C/O (01/07/08) 04/13/08 LBS /PJC DRLG DRAFT CORRECTIONS BP Exploration (Alaska) NO A NORDIC - CALISTA RIG 1 CHOKE / REEL /CIRCULATION MANIFOLD DIAGRAM ' V12 V14 7 -1118" 6000 psi BOP's ID = 7.08" x � � .. V78 VII mil. 17 1M6 "6000 psi, Rx-16 Transducers I II'I I EGAB E V2 V1 V 16 I maw rypi,:al OOP 6enumt for 2.461.. coiled tooln0 drieloo eei I T 1M6" 6600 pal Rx-e6 I V17 n ' To Poor Boy Gas Buster NCR I I I IC '�' A--- is( OK I C X , Alb 21116"6600 •1, ax I 3 or woo pst h6R 1 , , 1l3 • PC All 2.1M6" 6000 psi CHECK I 1111 Manual Choke . VALVE rrsrms IC& ∎ �,, 7 1M6 Cameron POV Cate I ■ .. Valve x6060 pe - MEOH /Diesel ' - � — P Line CoFlex Hose . =. .I, 114 Turn Nalco 10W0G To Production Tree or Cross Over • 4 1 •r= e transducers CoFlex Hose ' 1111 N11 ) 11 11 Nit To Coiled Tuning ; i i 1 1 1 Bleed Off Inner Reel Valve 11111111 ,� ,....= _..__ - ,r � � [ ]1 1N33 _ 1 + 11 E 11 Cement Line In 1 1 1 l i Ground Level Tie -in N30 - 1:V3 CV2 T Stand Pipe - II __. - ___ - _ Manual Choke _ �. -- —:-.' MI __._ _ g . - MP 7. - :: Pressure Transducer imimmi -.:..-.•--- � Matto 1 ! • = ® s cvv 0 w r A �► cv6 II I Tiger Tank Mud Pump 2 ' — O Tlit1 ► _ _ Baker MP 1 3 MP 2 ° Choke • • CV74 — to Pits Rig Floor Mud Pum 410 V16 Reverse Cl _ _ ,.,.,. Cir CT w I aM weer • _. • _ _. To Manifold .,._..yew .. .. .._�,....:,.. .. 1 CV16 1Jun- 2010 1 Revenge rir.,detioo line / a7 while nnft CoFlex Hose • y:.~"„ yk 'ra; ~~:_ z mil,. y -+ L ~`~~ ~'l~~ ~` ~. • .~, ~, . ~~ MICROFILMED 6/30/2010 DO NOT PLACE ANY NEW MATERIAL UNDER THIS PAGE C:\temp\Temporary Internet Files\OLK9\Microfilm_Marker.doc DATA SUBMITTAL COMPLIANCE REPORT 12/18/2008 Permit to Drill 2071570 Well Name/No. PRUDHOE BAY UNIT 18-136 Operator BP EXPLORATION (ALASKA) INC API No. 50-029-21756-02-00 MD 11550 TVD 8752 Completion Date 12/9/2007 Completion Status 1-OIL Current Status 1-OIL UIC N REQUIRED INFORMATION ~~ _ / Mud Log No DATA INFORMATI ON Types Electric or Other Logs Run: MWD DIR / GR, MCNL / GR /CCL Well Log Information: Log/ Electr Data Digital Dataset Ty Med/Frmt Number Name D D Asc Directional Survey ~,~ ,R 'pt Directional Survey , J VRpt Directional Survey Rpt ~ / Directional Survey • L rF pt Directional Survey / /ED C Las / 159481 Gamma Ray ~g Production r~D C Pds 16108 Production ~D C Pd 16414~P d ti s i ro uc on o Production g 'ED C Li 1 2~ s 655 eutron ', L og Neutron / /ED C Lis 16553 ~/fVeutron Cog Neutron y~pt LIS Verification Samples No Directional Survey (data taken from Logs Portion of Master Well Data Maint Log Log Run Interval OH / Scale Media No -- -__._ Start Stop CH Received Comments _.-- ----- 9639 11550 Open 1/10/2008 --------.__.----_--_- Disk also contains P61, P62, PB3 9639 11550 Open 1/10/2008 9155 10578 Open 1!10/2008 PB 1 10220 10500 Open 1/10/2008 PB 2 9951 12152 Open 1/10/2008 PB 3 8008 11440 Open 2/25/2008 LAS FCNL, GR, NCNL wlPDS and PDF graphics 2 Blu 8450 8800 Case 4/10/2008 PPL, Spin, Temp, Pres, Grad, Cali 27-Mar-2008 8450 8800 Case 4/10/2008 PPL, Spin, Temp, Pres, Grad, Cali 27-Mar-2008 8390 11484 Case 6/6/2008 mem PPL, PSP Pres, Temp, Spin, GR, CCL 18- May-2008 5 Blu 8390 11484 Case 6/6/2008 mem PPL, PSP Pres, Temp, Spin, GR, CCL 18- May-2008 8018 11436 Open 7/3/2008 LIS Veri, GR, CNT 25 Blu 8100 11421 Open 7/3/2008 MCNL, GR, CCL 7-Dec- 2008 8395 11475 Open 7/3/2008 LIS Veri, GR, CNT 25 Blu 8382 11473 Open 7/3!2008 Mem Boarx CNL, Lee, GR, CCL 18-May-2008 9050 11560 Open 9/8/2008 LIS Veri, GR, ROP r ~ L._J r~ DATA SUBMITTAL COMPLIANCE REPORT 12/18/2008 Permit to Drill 2071570 Well Name/No. PRUDHOE BAY UNIT 18-13B MD 11550 TVD 8752 Completion Date 12/9/2007 D C 16877'~Gamma Ray Operator BP EXPLORATION (ALASKA) INC API No. 50-029-21756-02-00 Completion Status 1-OIL R pt LI Verification 11 !~D C 16878 Gamma Ray !,~~p LEIS Verification QED C 16879 vLIS Verification ~~I~~ L/IS Verification (iED C 16880L/LIS Verification i.L~og Gamma Ray 25 Col wog Gamma Ray 25 Col cog See Notes 2 Col ~(Lpg Gamma Ray 25 Col Log Gamma Ray 25 Col ~og See Notes 2 Col yLog Gamma Ray 25 Col "Log Gamma Ray 25 Col rYLog See Notes 2 Col g Gamma Ray 25 Col g Gamma Ray 25 Col , Log ee Notes S 2 Col ~ ED C L / 1 91 /G R ' as 5 5 amma ay ', EU C Las 15916~Gamma Ray 'ED C L ~ ! as 15917 mma Ray Current Status 1-OIL UIC N 9050 11560 Open 9/8/2008 LIS Veri, GR, ROP **Open with WordPad, will not open otherwise.** 9090 10590 Open 9/8/2008 P61 LIS Veri, GR, ROP 9090 10590 Open 9/8/2008 PB1 LIS Veri, GR, ROP **Open with WordPad, will not open otherwise.** 9070 10507 Open 9/8/2008 PB2 LIS Veri, GR, ROP 9070 10507 Open 9/8!2008 P62 LIS Veri, GR, ROP **Open with WordPad, will not open otherwise.** 9190 10507 Open 9/8/2008 PB3 LIS Veri, GR, ROP 9190 10507 Open 9/8/2008 PB3 LIS Veri, GR, ROP **Open with WordPad, will not open otherwise.** 9219 1150 Open 9/8/2008 TVD GR 3-Dec-2007 9219 1150 Open 9/8/2008 MD GR 3-Dec-2007 9070 11563 Open 9/8/2008 Depth Shift Monitor Plot 9200 10578 Open 9/8/2008 P61 TVD GR 13-Nov-2007 9200 10578 Open 9/8/2008 PB1 MD GR 13-Nov-2007 9070 10560 Open 9/8/2008 P61 Depth Shift Monitor Plot 9200 10500 Open 9/8/2008 BP2 TVD GR 13-Nov-2007 9200 10500 Open 9/8/2008 PB2 MD GR 13-Nov-2007 9070 10584 Open 9/8/2008 PB2 Depth Shift Monitor Plot 9200 12152 Open 9/8/2008 PB3 MD GR 24-Nov-2007 9200 12152 Open 9/8/2008 PB3 TVD GR 24-Nov-2007 9070 12158 Open 9/8/2008 PB3 Depth Shift Monitor Plot 9100 10579 Open 2/8/2008 PB 1 GR & ROP plus Graphics 9100 10579 Open 2/8/2008 PB 2 GR & ROP plus Graphics 9100 12152 Open 2/8/2008 PB 3 GR & ROP plus Graphics I DATA SUBMITTAL COMPLIANCE REPORT 12/18/2008 Permit to Drill 2071570 Well Name/No. PRUDHOE BAY UNIT 18-13B Operator BP EXPLORATION (ALASKA) INC MD 11550 TVD 8752 Completion Date 12/9/2007 Completion Status 1-OIL Current Status 1-OIL Well Cores/Samples Information: Sample Interval Set Name Start Stop Sent Received Number Comments ADDITIONAL INFORM N Well Cored? ~ Chips Received? Y~/ N Analysis ~l'/lQ- Received? Comments: Daily History Received? y~"" Formation Tops API No. 50-029-21756-02-00 UIC N Compliance Reviewed By: _.__ _ ___ - _ _ _--- Date: • INTEQ Log & Data Transmittal Form To: State of Alaska -AOGCC 333 W. 7th Ave. Suite 100 Anchorage, Alaska 99501 Attention: Christine Mahnken Reference: 18-13B,18-13BPB1, 18-13BPB2 & 18-13BPB3 Contains the following: ~LDWG Compact Disc (Includes Graphic Image files) ~LDWG lister summary ~olor print - GR Directional Measured Depth Log (to follow) .color print - GR Directional TVD Log (to follow) LAC Job#: 1643649 i '~- !S~ i L~~s~~ i~~~~ ~ ~~~~9 ~~~s~a Sent by: Catrina Guidry Date: 09/OS/0~ `~ Received by: Date: ~ ,~ ~ , , E; `- - - PLEASE ACKNOWLEDGE RECEIPT BY SIGNING ~ RETURNING OR FAXING YOUR COPY FAX: (907) 267-6623 r/d'~ BAKER ~nrex~ec ~i~ ~ i.~ Baker Hughes INTEQ 7260 Homer Drive Anchorage, Alaska 99518 Direct: (907) 267-6612 FAX: (907) 267-6623 BAKER MuccMEs CUMYANY WELL NAME FIELD Saker Atlas PRINT DISTRIBUTION LIST BY EXYLUKA'1'lUN (ALASKA) 1N(: CUUN'1'Y NURI'H SLUY>; BUKUUGH 18-13B STATE ALASKA PRUDHOE BAY UNIT DATE 9/5/2008 THIS DISTRIBUTION LIST AUTHORIZED BY: CATRINA GUIDRY SO #: 1643649 Copies of Copies Digital Copies of Copies Digital Each Log of Film Data Each Log of Film Data 2 Company BP EXPLORATION (ALASKA) INC 1 Company DNR - DNISION OF OIL & GAS Person PETROTECHNICAL DATA CENTER Person KRISTIN DIRKS Address LR2-1 Address 550 WEST 7TH AVE 900 E BENSON BLVD. SUITE 802 ANCHORAGE, AK 99508 ANCHORAGE, AK 99501 1 Company EXXON MOBIL PRODUCTION CO Company Person FILE ROOM Person Address 800 BELL STREET Address EMB GSC 3082A HOUSTON, TX 77002 1 Company STATE OF ALASKA - AOGCC Company Person CHRISTINE MAHNKEN Person Address 333 W. 7TH AVE Address SUITE 100 ANCHORAGE, AK 99501 Company Company Person Person Address Address Company Company Person Person Address Address Data Disseminated Bv: BAKER ATLAS-PDC 17015 Aldine Westfield, Houston, Texas 77073 This Distribution List Completed Bv: ~~~ 1,1~- J- ,, ~; e° Page I of 1 i • ~~~-_ BAKER N~J6F~E5 Baker Atlas PRINT DISTRIBUTION LIST CUMYAN'Y BY EXYLURA'l'lUN (ALASKA] iNC CUUN1'Y NUK'1'H SLUYE BUKUUUH WELL NAME 18-13BPB1 STATE ALASKA FIELD PRUDHOE BAY UNIT THIS DISTRIBUTION LIST AUTHORIZED BY DATE 9/Si2008 CATRINA GUIDRY SO #: 1643649 Copies of Copies Digital Copies of Copies Digital Each Log of Film Data Each Log of Film Data 2 Company BP EXPLORATION (ALASKAI INC 1 Company DNR - DIVISION OF OIL & GAS Person PETROTECHNICAL DATA CENTER Person KRISTIN DIRKS Address LR2-1 Address 550 WEST 7TH AVE 900 E BENSON BLVD. SUITE 802 ANCHORAGE, AK 99508 ANCHORAGE AK 99501 1 Company EXXON MOBIL PRODUCTION CO Company Person FILE ROOM Person Address 800 BELL STREET Address EMB GSC 3082A HOUSTON, TX 77002 1 Company STATE OF ALASKA - AOGCC Company Person CHRISTINE MAHNKEN Person Address 333 W. 7TH AVE Address SUITE 100 ANCHORAGE. AK 99501 Company Company Person Person Address Address Company Company Person Person Address Address Data Disseminated By BAKER ATLAS-PDC 17015 Aldine Westfield, Houston, Texas 77073 This Distribution List Completed Bv: 1 ,} 4 .~i r ~~ ~~ •O ~ _ f~~ Page 1 of 1 ~/t® BAKER MYGNES Baker Atlas PRINT DISTRIBUTION LIST CUMYANY BY EXYLUKAIIUN (ALASKA) INC CUUN lY NUK'I'H SLUPE BUKUUCiH 18-13BYB2 WELL NAME 18-13BPB3 STATE ALASKA FIELD PRUDHOE BAY UNIT DATE 9/5/2008 THIS DISTRIBUTION LIST AUTHORIZED BY: CATRINA GUIDRY SO #: 1643649 Copies of Copies Digital Copies of Copies Digital Each Log of Film Data Each Log of Film Data 2 Company BP EXPLORATION (ALASKA) INC 1 Company DNR -DIVISION OF OIL & GAS Person PETROTECHNICAL DATA CENTER Person KRISTIN DIRKS Address LR2-1 Address 550 WEST 7TH AVE 900 E BENSON BLVD. SUITE 802 ANCHORAGE, AK 99508 ANCHORAGE, AK 99501 I Company EXXON MOBIL PRODUCTION CO Company Person FILE ROOM Person Address 800 BELL STREET Address EMB GSC 3082A HOUSTON, TX 77002 1 Company STATE OF ALASKA - AOGCC Company Person CHRISTINE MAHNKEN Person Address 333 W. 7TH AVE Address SUITE 100 ANCHORAGE, AK 99501 Company Company Person Person Address Address Company Company Person Person Address Address Data Disseminated Bv' BAKER ATLAS-PDC 17015 Aldine Westfield, Houston, Texas 77073 This Distribution List Completed Bv: (~ 11 /~ /~ ~`~ ~ ~ 4~ Page 1 of 1 05/30/08 It `~ ~?~i~l~ll~~1-~6l- Alaska Data & Consulting Services 2525 Gambell Street, Suite 400 Anchorage, AK 99503-2838 ATTN: Beth wpu .Inh ~ NO.4727 Company: State of Alaska Alaska Oil & Gas Cons Comm Attn: Christine Mahnken 333 West 7th Ave, Suite 100 Anchorage, AK 99501 Inn nee...:..r:..., neFs ni r..i... rn Z-03 11975773 SFRT i- (~ 05/20/08 1 1 P2-32 12066522 MEM TEM SURVEY 05/19/08 1 1 18-i3B 12021159 MEM PROD PROFILE - ~ ~ 05/18/08 1 1 Z-03 11975773 USIT - G~ ~ 05/19/08 1 1 W-29 11999017 INJECTION PROFILE ( 05/26108 1 1 15-39A 11999018 PRODUCTION PROFILE Q(p - c, 05/28/08 1 1 07-30A 11963095 SCMT - ~ 05/27/08 1 1 14-09B 11982432 PROD PROFILE W/FSI - Q, V 05/27/08 1 1 A-34A 12057614 USIT - p '~ /(pGfD~- 05/26/08 1 1 GNI-04 11824353 OH LDWG EDIT (DSI) V _ I L 11/07/07 1 1 YLtA,t HI:KNUWLtUtit RtlalYl t3Y SIGNING AND REI URNING ONE DOPY EAGR TO: BP Exploration (Alaska) Inc. Petrotechnical Data Center LR2-1 900 E. Benson Blvd. Anchorage, Alaska 99508 Date Delivered: •- '~_'~!;p ,,` Alaska Data & Consulting Services 2525 Gambell Street, Suite 40 Anchorage, AK 99503-2 38 i / ATTN: Beth /',. // Received by: (l//~~ 04/09/08 ,~ ~~ ~clum~er~er NO. 4657 Alaska Data & Consulting Services Company: State of Alaska 2525 Gambell Street, Suite 40o Alaska Oil & Gas Cons Comm Anchorage, AK 99503-2838 Attn: Christine Mahnken ATTN: Beth 333 West 7th Ave, Suite 100 Anchorage, AK 99501 Field: P.Bay, Endicott, Orion ..,. n..e...:...:..., n~re al c„1.,. rn 03-10 12045070 USIT -~ 03/24/08 1 1 1-21/K-25 11998996 USIT 03/25/08 1 1 V-223 12061688 CEMENT EVALUATION LOG /(p 03/23/08 1 1 V-214 11978449 MI INJECTOR V - ~ (O r 0 04/01/08 1 1 18-13B 12061689 PRODUCTION PROFILE _'-~ ~ 03/27!08 1 1 E-10A 11998994 USIT (~ ~} 03/28/08 1 1 02-12B 11628789 MCNL a / ! U _ 08/21/07 1 t 15-45B 11963079 MCNL () 02/14/08 1 1 V-220 12031459 CH EDIT PDC GR (USIT)~(5~ <(p d 03/07/08 1 V-214 40016214 OH MWD /LWD 04!01/08 2 1 ~~ -\ _ PLEASEAGKNlJWLEUtitl-itGt1P1 t3T'i(9NIrvldArvutitluFirv~rvliyrvcl.vrT cru,n iv: BP Exploration (Alaska) Inc. I :~ Petrotechnical Data Center LR2-1 " ' 900 E. Benson Blvd. Anchorage, Alaska 99508 ~~ rp~~ ~ ~~ Date Delivered Alaska Data & Consulting Services 2525 Gambell Street, Suite 400 Anchorage, AK 99503-28 ATTN: Beth Received b i Date 02-25-2008 Transmittal Number:92929 BPXA WELL DATA TRANSMITTAL Enclosed are the materials listed below. (BPXA FIELD LOG DATA) If you have any questions, please contact Douglas Dortch at the PDC at 564-4973 Delivery Contents 1 CD-ROM Containing Field Log Data & Electronic Log Prints for the following wells: 02-09C ~v~- t3~1 ~Y59~/'S.- 15-046 ~0~._l3~ ~ IS~L 15-046P61 o'~O'~'!3b ~ /59'~/~ 18-136 ~p~.. !b ~ " 169~/'~ L-219 UAL' 2o'a-- ~~(~ '~159yg .,-----, MPF-19 Tc5¢ ~° °'fe ,1a+aor~ecf• -f'~ie AP.~' ~' la~~ rvt i~H-(9 = awe t~a+ dure i'Q yoo pu+ ~e MPF-19L1 ~-~ t IM ~~I- t `i' ~ 1 - U (CS ~d q. ~.O Please Sign ar~d Ret~rrone copy of this transmittal. Thank You, Douglas Dortch Petrotechnical Data Center Attn: State of Alaska - AOGCC Attn: Christine Mahnken 333 W. 7th Ave, Suite 100 Anchorage, Alaska 99501 ~+r.~ ~ rteASe ~' ~~i5tlvte - `~~~ r~`' "~1 ~~C L~ ~;~ ?CJ()~ v`'`~Y~a~~i~ ~~aN ~x ~~~Y~ ipYYY6~~ a~tiY~~Y'YYYti:~krYYY ~ttY~IYtYY' Petrotechnical Data Center LR2-1 900 E. Benson Blvd. PO Box 196612 Anchorage, AK 99519-6612 i STATE OF ALASKA ~~ ~~ ALASKA OIL AND GAS CONSERVATION COMMISSION ~A~ G~<.i~~ WELL COMPLETION OR RECOMPLETION REPORT AND LOG Atltska Oil ~ ~~~ C~;~i~. ~,rirfllssior 1 a. Well Status: ®Oil ^ Gas ^ Plugged ^ Abandoned ^ Suspended zoAACZS.~os zoAACZS.»o ^ GINJ ^ WINJ ^ WDSPL ^ WAG ^ Other No. of Completions One =1 b. -Well Cla ®Development ^ Exploratory ^ Service ^ Stratigraphic 2. Operator Name: BP Exploration (Alaska) Inc. 5. Date Comp., Susp., or Aba 12/9/2007 ~ 12. Permit to Drill Number 207-157 - 3. Address: P.O. Box 196612, Anchorage, Alaska 99519-6612 6. Date Spudded ~ 11/9/2007 ~ 13. API Number 50-02921756-02-00 4a. Location of Well (Governmental Section): Surface: ' ' 7. Date T.D. Reached 12/3/2007 ~ 14. Well Name and Number: PBU 18-136 1045 FNL, 371 FWL, SEC. 19, T11N, R15E, UM Top of Productive Horizon: 3111' FNL, 2914' FWL, SEC. 19, T11 N, R15E, UM 8. KB (ft above MSL): 54.8' ~ Ground (ft MSL): 15. Field /Pool(s): Prudhoe Bay Field / Prudhoe Bay Total Depth: 3751' FNL, 4514' FWL, SEC. 19, T11 N, R15E, UM 9. Plug Back Depth (MD+ND) 11509 8752 P°ol 4b. Location of Well (State Base Plane Coordinates, NAD 27): Surface; x- 692133 y- 5960832 Zone- ASP4 10. Total Depth (MD+TVD) 11550 8752 16. Property Designation: ADL 028321- TPI: x- 694728 y- 5958833 Zone- ASP4 Total Depth: x- 696344 y- 5958234 Zone- ASP4 11. SSSV Depth (MD+TVD) None 17. Land Use Permit: 18. Directional Survey ®Yes ^ No Submit electronic and rinted inf rmation er 20 AAC 25.050 19. Water depth, if offshore N/A ft MSL 20. Thickness of Permafrost (TVD): 1900' (Approx.) 21. Logs Obtained (List all logs here and submit electronic and printed informal n per 20 AAC 25.071): MWD DIR / GR, MCNL / GR / CCL ,dv''//VDT/.! ~' ~9~D.~MD ~~J6 T!/,a 22. CASING, LINER AND CEMENTING RECORD CASING SETTING DEPTH MD SETTINCr DEPTH TVD HOLE AMOUNT WT. PER FT. GRADE TOP 'BOTTOM TOP. BOTTOM SIZE CEMENTING RECORD PULLED 20" 91.5# H-4 Surface 110' Surface 110' 30" 1694# Poleset 13-3/8" 72# / 68# K-55 / L-80 Surface 4482' Surface 4429' 17-1 /2" 3500 sx CS III, 600 sx'G', Top Job: 100 sx CS II 9-5/8" 47# L-80 Surface 9103' Surface 8263' 12-1/4" 930 sx Class'G' 7" 29# L-8 8805' 8087' 8316' 8-1/2" sx Class 'G' 4-1 /2" 12.6# L-80 8698' 9 0 ' 8025' 8316' 6" 523 sx Class 'G' 3-1/2" x 3-3/16° x 2-716° a.a~~ ~ s.z# i s.~sa L-80 8572' 11546' 7954' 8752' 4-1 /8" 141 sx Class 'G' 23. Open to production or inject ion? ®Yes ^ No 24. TU61NG RECORD If Yes, list each i (MD+ND of Top & Bottom; Pe nterval open rforation Size and Number): SIZE DEPTH SET MD PACKER SET MD 2" Gun Diameter, 6 spf 4-1/2", 12.6#, L-80 8718' 8548' & 8662' MD TVD MD TVD 10160' - 10310' 8738' - 8738' 10580' - 11510' 8743' - 8752' 25. ACID, FRACTURE, CEMENT SQUEEZE, ETC. DEPTH INTERVAL MD AMOUNT He KIND OF MATERIAL USED 2000' Freeze Protect w/ 58 Bbls of Diesel 26. PRODUCTION TEST Date First Production: Not on Production Yet Method of Operation (Flowing, Gas Lift, etc.): N/A Date Of Test: HOUfS Tested: PRODUCTION FOR TEST PERIOD OIL-BBL: GAS-MCF: WATER-BBL: CHOKE SIZE: GAS-OIL RATIO: Flow Tubing PreSS. C2SIng PreSS: CALCULATED 24-HOUR RATE OIL-BBL: GAS-MCF: WATER-BBL: OIL GRAVITY-API (CORK): 27. CORE DATA Conventional Core(s) Acquired? ^Yes ®No Sidewal l Cores Ac uired? ^Yes ®No If Yes to either question, list formations and intervals cored (MD+ND of top and bottom of each), and summarize lithology and presence of oil, gas or water (submit separate sheets with this form, if needed). Submit detailed descriptions, core chips, photographs and laboratory analytical results per 20 AAC 250.071. - til3i4'a~~~~i~i+~ia e None ~? ~°~. ~AN 3 .~ ~~~E ~~'~~-~ - Form 10-407 Revised 02/2007 CONTINUED ON REVERSE .SIDE V 28. GEOLOGIC MARKERS (LIST ALL FORMATIONS AN ERS ENCOUNTERED): 29. FORMATION TESTS NAME MD TVD Well Tested? ^ Yes ®No Permafrost Top If yes, list intervals and formations tested, briefly summarizing test results. Attach separate sheets to this form, if needed, and submit Permafrost Base detailed test information per 20 AAC 25.071. Sadlerochit /Zone 4A / 42SB 9289' 8367' None Top CGL 9363' 8420' Base CGL 9435' 8480' Zone 2B / 23SB 9503' 8539' 22TS 9540' 8570' Zone 2A / 21 TS 9607' 8620' Zone 1 B 9690' 8672' Zone 1A /TDF 9776' 8711' Formation at Total Depth (Name): Zone 1A /TDF 9776' 8711' 30. List of Attachments: Summary of Daily Drilling Reports, Well Schematic Diagram, Surveys 31. I hereby certify that the foreg 'ng is true and correct to the best of my knowledge. ~q/ Signed Terrie Hubble Title Drilling Technologist Date PBU 18-138 207-157 Prepared ey NameMumber. Terrie Hubble, 564-4628 Well Number Drilling Engineer: Lamar Gantt, 564-5593 Permit No. / A royal No. INSTRUCTIONS GeNeRA~: This form is designed for submitting a complete and correct well completion report and log on all types of lands and leases in Alaska. Submit a well schematic diagram with each 10-407 well completion report and 10-404 well sundry report when the downhole well design is changed. IreM 1a: Classification of Service Wells: Gas Injection, Water Injection, Water-Alternating-Gas Injection, Salt Water Disposal, Water Supply for Injection, Observation, or Other. Multiple completion is defined as a well producing from more than one pool with production from each pool completely segregated. Each segregated pool is a completion. IreM 4b: TPI (Top of Producing Interval). IreM 8: The Kelly Bushing and Ground Level elevation in feet above mean sea level. Use same as reference for depth measurements given in other spaces on this form and in any attachments. IreM 13: The API number reported to AOGCC must be 14 digits (ex: 50-029-20123-00-00). IreM 20: Report true vertical thickness of permafrost in Box 20. Provide MD and TVD for the top and base of permafrost in Box 28. IreM 22: Attached supplemental records for this well should show the details of any multiple stage cementing and the location of the cementing tool. IreM 23: If this well is completed for separate production from more than one interval (multiple completion), so state in item 1, and in item 23 show the producing intervals for only the interval reported in item 26. (Submit a separate form for each additional interval to be separately produced, showing the data pertinent to such interval). IreM 26: Method of Operation: Flowing, Gas Lift, Rod Pump, Hydraulic Pump, Submersible, Water Injection, Gas Injection, Shut-In, or Other (explain). IreM 27: Provide a listing of intervals cored and the corresponding formations, and a brief description in this box. Submit detailed description and analytical laboratory information required by 20 AAC 25.071. IreM 29: Provide a listing of intervals tested and the corresponding formation, and a brief summary in this box. Submit detailed test and analytical laboratory information required by 20 AAC 25.071. Form 10-407 Revised 02/2007 Submit Original Onty BP EXPLORATION Page 1 of 40 Operations Summary Report Legal Well Name: 18-13A Common Well Name: 18-13A Spud Date: 11/3/1987 Event Name: DRILL+COMPLETE Start: 10/27/2007 End: 11/7/2007 Contractor Name: NORDIC CALISTA Rig Release: 12/9/2007 Rig Name: NORDIC 2 Rig Number: Date From - To I Hours I Task L Code ( NPT I Phase I Description of Operations 10/30/2007 00:00 - 02:30 2.50 MOB P PRE 02:30 - 03:40 1.17 MOB P PRE 03:40 - 06:00 2.33 MOB P PRE 06:00 - 08:30 2.50 MOB P PRE ~i 08:30 - 10:30 2.00 MOB P PRE 10:30 - 10:45 0.25 MOB P PRE 10:45 - 12:30 1.75 MOB P PRE 12:30 - 18:00 I 5.501 BOPSUf~ P I I PRE 18:00 - 23:00 I 5.001 BOPSUa P I I PRE 23:00 - 23:45 0.75 BOPSU P PRE 23:45 - 00:00 0.25 BOPSU P PRE 10/31/2007 00:00 - 01:00 1.00 BOPSU P PRE 01:00 - 03:45 2.75 CLEAN P WEXIT 03:45 - 05:30 I 1.751 CLEAN I P 05:30 - 07:45 2.25 CLEAN P 07:45 - 07:50 0.08 CLEAN P 07:50 - 09:00 1.17 CLEAN P 09:00 - 09:35 0.58 CLEAN P 09:35 - 10:10 0.58 CLEAN P 10:10 - 10:30 10:30 - 11:10 11:10 - 12:30 0.331 CLEAN I P 0.67 CLEAN P 1.33 CLEAN P WEXIT WEXIT WEXIT WEXIT WEXIT WEXIT WEXIT WEXIT WEXIT Move rig from X-pad to DS 18. Via the Spine, Oxbow & West dock road. Rig is on the Spine road. Rig is on the Oxbow road. Finish move to DS 18. Park in front of well and set down Find cellar mats and herculite and set same MIRU main camp. Spot satellite camp Repair Baker choke Safety mtg re: move over tree Move rig over tree and set down (took a couple tries to get it right) Accept rig at 1230 hrs 10/30/07 ND tree cap. NU 7-1/16" BOPE. RU IA, OA gauges. Bring on rig water. Bring on 2% KCL water. RU hardline to TT & P.T. to 4000psi-good test, bled off. Spot cuttings box. Off load trailers. Get comms hooked up. Hook up comms to office shack. Get BOPE measurements. Lay out traction mats around rig/office/camp entrance's. SLB performing chain inspection, & replacing pins. Grease choke & kill line valves & all other associated valves. Install night cap & hose to test pump. Fill stack with a clear nonalcoholic liquid aka H2O. Conduct BOP test as per PTD abd AOGCC Representative Held PJSM on pulling BPV. Install lubricator and PT same to 2000 psi Pulled BPV pout and RD Valve Crew. WHP = 0 psi PU Injector and installed CTC and pull tested to 30k Pumped 6 bbl diesel to cutting box PT the CTC to 3500 psi. PU BHA Set counters and RIH to 200 ft, Open EDC, RIH displacing diesel to TT. Bring all well fluids up to 2 ppb biozan. Tap up at 8650' (overshot). Close EDC & pump through mil. Bobble past overshot. Continue to RIH. WT ck @ 8900' = 37k, RIW = 17K. Increase pump rate to 2.6bpm/2460psi. Slowly RIH & lightly tag Fas Drill Plug (a7 9017'.. PUH slowly while circulating bottom's up before milling on Fas Plug. Bottom's relieved various rig treats -silicone, electrical tape, bits of rubber, small bits of metal. Pump 5 bbls of Hi-Vis Bio. RIH to top of Fas Drill Plug. Bleed down IA from 900psi to 65psi to the TT, gas and diesel. Tag up @ 9016.3'. Stall 3 times. 6k overpull. Ease on downhole, 0.1' every 1 min. Keep stalling at 9015.3', losing hole. PU, dragging something up hole 20k over. PU to 8960'. Pump 10bb1 Hi-Vis sweep. 9016.3' & stacking weight, not seeing any WOB, pill out of bit. PU to 8000' (40 degrees) & chase pill uphole WT=36k up. Dragging something up hole - 3k over. Small chunks of rubber coming across the shaker. Small chunks of composite Fas Drill plug coming across shaker. RIH to bottom. Didn't see anything while RIH past overshot @ 8650' B.O.B. 2.64bpm /2575psi. Loosing returns. 2.78in/1.10out. Drop rate & POH & swap to flo-pro. Dragging something up hole. Increase pump rate. Printed: 12/19/2007 2:44:18 PM BP EXPLORATION Page 2 of 40 Operations Summary Report Legal Well Name: 18-13A Common Well Name: 18-13A Spud Date: 11/3/1987 Event Name: DRILL+COMPLETE Start: 10/27/2007 End: 11/7/2007 Contractor Name: NORDIC CALISTA Rig Release: 12/9/2007 Rig Name: NORDIC 2 Rig Number: Dater I From - To I Hours I Task I Code I NPT I Phase I , Description of Operations 10/31 /2007 12:30 - 13:25 13:25 - 15:05 15:05 - 15:40 15:40 - 18:51 18:51 - 22:15 22:15 - 00:00 11/1/2007 00:00 - 00:30 00:30 - 01:30 01:30 - 03:15 03:15 - 03:40 03:40 - 05:30 05:30 - 06:00 0.92 CLEAN P 1.67 CLEAN P 0.58 CLEAN P 3.18 CLEAN P 3.40 WHIP P 1.75 WHIP P 0.50 WHIP P 1.00 WHIP P 1.75 WHIP P 0.42 WHIP P 1.83 WHIP N 0.50 WHIP N WEXIT Resume milling on Fas Plug. from 9014' @ 2.64bpm/3025psi. 2.4 bpm out. (30bbls away & losses recovered). WEXIT Push lu to bottom 40'/min. WEXIT WT ck= 38k at 11300'. Stop pumping @ 11300' & push Fas drill plug past MLAS jt @ 11345'. Resume pumping at 11420' & continue to push plug to bottom. WEXIT Tag bottom at 13017'. Open EDC & POH, WT=38k. WEXIT LD BHA (3 bladed junk mill had severe scarring, multiple chipped teeth & motor had light scarring). PU WS / KB Packer WS, setting tool and Coiltrac BHA WEXIT RIH with WS BHA WEXIT RIH with WS BHA WEXIT Starting at 8600 ft, seen some set downs and lost returns while running in the hole.. Pushing something ahead of us. Worked down and at 8784 ft decided to POOH and clean this thing up. Unable to PUH, work CT Pulling between 50 k up and 1k down String wt at this depth = 36 k up and 20 k down Worst spot is the 8800 ft Not seeing WOB from sensor and orienter is turning freely. Had to pull up to 62k to get free No evidence of pulling on the tool, hung up somewhere above the CTC. WEXIT POOH, ordered out 3-1/8" Venturi Basket with 3-5/8" "shoe. WEXIT LD Coiltrack and discovered that the packer and WS are left in DFAL WEXIT Wait on fishing tools DFAL WEXIT PU Fishing Hook BHA. Check out BHI tools on catwalk. Scribe 06:00 - 06:20 06:20 - 07:00 07:00 - 08:20 08:20 - 08:40 0.331 WHIP ( N 0.67 WHIP N 1.33 WHIP N 0.33 WHIP N 08:40 - 09:00 0.33 WHIP N 09:00 - 09:05 0.08 WHIP N 09:05 - 09:45 0.67 WHIP N 09:45 - 10:05 0.33 WHIP N 10:05 - 10:50 10:50 - 13:40 0.751 WHIP I N 2.831 WHIP IN WS hook. DFAL WEXIT CO w/ day crew. PJSM regarding handing fishing tools. DFAL WEXIT PU whipstock hook. PU BHI tools. PU injector & MU to tools. Stab onto well. Power up & check toots. DFAL WEXIT RIH with whipstock pulling tool (slightly bent hook). DFAL WEXIT WT ck @ 7500' = 30k, RIW = 13.5k. Pump 10bb1 sweep of 2ppb bio (left over from yesterday). 1.5bpml2000psi. Orientate hook 57 degrees ROHS. Slow down RIH speed to 40'/min. DFAL WEXIT WT ck @ 8000' = 31 k, RIW = 15.5k. Slowly RIH @ 40'/min. Circulating at 2.2bpm/2500psi. Out MM is intermittently plugging up with debris, purge/blow down w/ air. DFAL WEXIT WT ck = 33k, RIW = 17k. DFAL WEXIT Tag fish. CBU @ 2.2bpm/2660psi. Bottom's up revealed nothing of interest. DFAL WEXIT Reduce to min rate. Try to latch @ 50 deg ROHS - no coo, sat down at 8818'. Try 30 deg ROHS - no go, sat down at 8818'. Try 20 deg LOHS, saw top of WS at 8814', sat down at 8817'. PU to 38k & set brake, -5k DHWOB. DFAL WEXIT 1 k jar lick. PU, 69k & lost returns (element released). PU to 92k & slack off to 60k. Try 3 times increasing speed each time. Slack off to 40k & up to 92k. Lost DHWOB sensor. No movement. Turn pumps off w/ 92k up (59k at the bit). Make calls to the SLB for guidance on coil life. Pressure up coil to 1000 psi. Popped free! Slowly PUH & try to orientate. DHWOB sensors works & is showing drag. Can't orientate, torqued up. Coil wt=33k. DFAL WEXIT Slowly PUH through profile @ 8696' & watch for overpull. POH Printed: 12/19/2007 2:44:18 PM BP EXPLORATION Page 3 of 40 Qperatiolns Sumlrnary Report Legal Well Name: 18-13A Common Well Name: 18-13A Spud Date: 11/3/1987 Event Name: DRILL+COMPLETE Start: 10/27/2007 End: 11/7/2007 Contractor Name: NORDIC CALISTA Rig Release: 12/9/2007 Rig Name: NORDIC 2 Rig Number: Date I From - To I Hours I Task I Code f .NPT I .Phase (; Description of Operations 11 /1 /2007 110:50 - 13:40 13:40 - 14:40 14:40 - 18:50 18:50 - 19:30 19:30 - 22:16 22:16 - 00:00 11 /2/2007 00:00 - 02:15 02:15 - 05:00 05:00 - 05:20 05:40 - 07:45 07:45 - 09:35 09:35 - 10:30 10:30 - 10:40 10:40 - 12:20 2.83 WHIP N DFAL WEXIT @ 50'/min. BHI tool shorted out @ - 8000' while POH. PJSM while POH regarding handling BHA. 1.00 WHIP N DFAL WEXIT Flow check at 200'. Pop off well & slowly PUH. At surface. Pulled out of the coil connector, shallow grooves from set screws & small dings in the pipe. Make series of phone calls to numerous people. E-line pulled out of the anchor, recovered 225' of a-line cable (157' of a-line slack still inside reel). Cut off 10' of coil. Terminate a-line cable. 4.17 WHIP N DFAL WEXIT Wait for BOT venturi BHA components. Bore out 2-3/8" BOT connector to 1.25" ID. Modify 3-7/8" Bowen overshot for SLB CTC. Load 6 jts of 2-3/8" PH6 into pipe shed. 0.67 WHIP N DFAL WEXIT Installed modified CTC (1.25" ID) and BHA with Venturi Basket 2.77 WHIP N DFAL WEXIT RIH Started circ at 2.2 bpm CTP at 3,700 psi at 5,000 ft Tagged at 8743 ft (Top of CTC) twice 1.73 WHIP N DFAL WEXIT POOH 2.25 WHIP N DFAL WEXIT OOH, RU to stand back PH6 tubing Recovered 1 small piece of rubber. LD Venturi Basket. PU OS (3.18" Grapple) BHA. TOF at 8,743 ft MD. PU Injector, set counters 2.75 WHIP N DFAL WEXIT RIH Op = 0.44 bpm at 1564 psi. Set down at 8,518 ft, X nipple oriented 10 clicks, worked through. RIH, set down in the Packer at 8,559 ft, oriented and worked through. Tagged the "X" nipple below the packer at 8,593 ft took 16 clicks. RIH and tagged the next "X" Nipple at 8,623 ft Took 109 clicks to get past. RIH and set down in the packer area at 8663 ft CTMD. Orient and worked through. RIH . Weight check up = 34.511bf at 1/2 bpm. 19k down, PU at 37.8 klbf wo /pump. 0.33 WHIP N DFAL WEXIT RIH to look for fish and latch Latched fish at 8741 and set grapple. PUH and fish started to move at 67,324 Ibf. POH dragging through nipples Dragging 3000 Ib extra Pulled heavy through alt nipples 2.08 WHIP N DFAL WEXIT POOH. Weight bobble at 2942' (upper GLM @ 3009') while POH. Continue to POH. PJSM while POH regarding handling BHA. No drag or surge through profile at 2110'. 1.83 WHIP N DFAL WEXIT Stop at 500'. Flow check. Pop off well. Set BHA in slips w/ dog collar. Undo BOT slip CTC (reduce the chance of spinning off the fish from overshot). Slowly stand back 4 stds of 2-3/8" PH6 in derrick. Slowly hoist up BHA to overshot. LD fishing BHA. Recovered BHI fish. LD BHI coiltrac BHA. 3-7/8" Bowen overshot heavily/deeply scarred w/ numerous dents. Whipstock still in the hole. Clean up RF. Fill hole -took 3bbls. 0.92 WHIP N DFAL WEXIT Clean BOT fishing tools. Take pictures of overshot & send to town. Take Bowen overshot apart. All 12 set crews were sheared at the knurled end of the screw. Take BHI XO's (reg to pac) & float sub to tuboscope for inspection. Test BHI tools - tested ok. 0.17 WHIP N DFAL WEXIT PJSM regarding Venturi BHA handling. 1.67 WHIP N DFAL WEXIT PU venturi basket. Break apart basket & inspect upper filter (plugged). Clean filter - 1/41b of metal debris recovered (small brass pieces, small flat metal band pieces, possible slip material, coil shavings -cut from chrome tubing). Continue to MU venturi basket BHA. MU BOT CTC. Pull test to 40k & PT to 4000psi. Hydraulic weight indicator & hydraulic pressure supply Printed: 12/19/2007 2:44:18 PM BP EXPLORATION Page 4 of 40 Operations Summary Report Legal Well Name: 18-13A Common Well Name: 18-13A Event Name: DRILL+COMPLETE Contractor Name: NORDIC CALISTA Rig Name: NORDIC 2 Date From - To Haurs Task: . Code. NPT 11/2/2007 10:40 - 12:20 1.67 WHIP N DFAL 12:20 - 15:10 2.83 WHIP N DFAL 15:10 - 16:40 I 1.501 WHIP I N DFAL WEXIT POH while pumping at 2.3bpm/3900psi. PJSM while POH regarding handling BHA. 16:40 - 18:00 1.33 WHIP N DFAL WEXIT Flow check well. Pop off well. Stand back 4 stds of 2-3/8" PH6 Spud Date: 11/3/1987 Start: 10/27/2007 End: 11/7/2007 Rig Release: 12/9/2007 Rig Number: Phase Description of Operations WEXIT gauge & CCAT read accurately +/- 10001b dill. WEXIT RIH with venturi BHA. Lost 11 bbls while RIH to 8800'. Weight booble at 8150'. WT ck = 38k, RIW = 18.7k @ 8700'. Tag at 8810'. PU, 3k overpull. PU to 8750' &venturi down to 8810' 2.3bpm/3900psi. PU to 8700' &venturi down to 8810'. POH @ 20'/min up to 7700' while venturing. tubing. Break apart venturi basket. Barrel was empty. Filter was plugged with metal shavings from coil, 1 piece of a metal bearing 1/4"x1/2", 4 ends of alien set screws from coil connector, large brass shear stock 1/4" to 3/4" OD in size, numerous slip pieces ranging in various sizes 3/4"x1/2", 2 large pieces of rubber from composite plug -- 21b of steel/brass/rubber. Discuss with WSL & town. 18:00 - 20:30 2.501 WHIP N DFAL WEXIT Ordered ou WL with extra wt bars, junk baskets and pump- bailer. Cut off 100 ft CT and installed new BOT CTC. Pull tested to 40k and PT to 3500 psi 20:30-23:00 2.50 WHIP IN 23:00 - 00:00 1.00 WHIP N 11 /3/2007 100:00 - 00:35 I 0.581 CLEAN I N 00:35 - 01:30 I 0.921 CLEAN N DFAL WEXIT 01:30 - 03:15 1.75 CLEAN N DFAL WEXIT 03:15 - 04:30 1.25 CLEAN N DFAL WEXIT 04:30 - 05:30 1.00 FISH N DFAL WEXIT 05:30 - 06:30 1.00 FISH N DFAL WEXIT 06:30 - 08:00 1.50 FISH N DFAL WEXIT 08:00 - 08:30 0.50 FISH N DFAL WEXIT 08:30 - 09:00 0.50 FISH N DFAL WEXIT 09:00 - 11:55 2.92 FISH N DFAL WEXIT 11:55 - 12:10 I 0.25 i FISH I N I DFAL I WEXIT 12:10 - 13:05 I 0.921 FISH I N I DFAL I WEXIT DFAL WEXIT DFAL WEXIT DFAL I WEXIT RIH with 3.625" GR and junk basket Tagged at 8650 ft, Worked through tp 8716 ft. PUH and had to jar out od hole through ail X nipples. POOH OOH with 1st JB run and recovered a few small piecies of metal The GR had a large groulge in it, dress up and RIH with GR #2 RIH with JB/ GR tagged at 8,829 ft PBTD, POOH Clean PUH through nipples RIH with 3.5" Pump Bailer Pumped 15 min at 8829 ft. POOH and recovered 4 small pieces. RD Wireline RU to PU OS to fish WS and KB Packer PU HDC (5/8" ball) Wait for BOT to bring 5/8" ball disconnect. PJSM regarding handling BHA. MU fish BHA, inspect/redress overshot. PU 4 stds of 2-3/8" PH6. Forgot check valves. Stand back 4 stds of 2-3/8" PH6. Stab floor valve & wait. Inspect BHA. PJSM regarding handling BHA. MU BHA, PU 4 stds of 2-3/8" PH6. PU injector & MU to BHA. Set counters &RIH. WT ck = 38k up @ 8450'. Tag at 8518'-profile (bobble through it), 8548'-packer(bobble through it), 8583'-profile (3 attempts & bobble through it), 8670'-packer (bobble through it), 8710'-profile (bobble through). These depths are. similar to previous set downs on prevoius runs (over torqued collars? rotten rubing? ballooned collars from setting numerous packers?. WT ck ~ 8800', can't come up. On fish? Lost 11 bbls while RIH. Start pumping at 1 bpm to cock jars. 1bpm/2220psi. Poaged free, jars did not go off. WT ck = 33.5k up. Continue to RIH. RIW = 19k Set down @ 8810'. PU free-38k. Bleed of CTP, set down @ 8812', set 5k down. PU free-38k. Set down at 8816'. Push down to 8824', RWI=12k. PU 39k, stop at 8750'. RIH. Set down at 8825'-5k down. PU - 38k. RIH faster @ 60'/min & set down Printed: 12/19/2007 2:44:18 PM BP EXPLORATION Page 5 Of 40 Operations Summary Report Legal Well Name: 18-13A Common Well Name: 18-13A Spud Date: 11/3/1987 Event Name: DRILL+COMPLETE Start: 10/27/2007 End: 11/7/2007 Contractor Name: NORDIC CALISTA Rig Release: 12/9/2007 Rig Name: NORDIC 2 Rig Number: Date- From - To Hours Task Code NPT Phase Description of Operations 11/3/2007 12:10 - 13:05 0.92 FISH N DFAL WEXIT at 8825'. PU - 41k stop at 8806'. Pump down backside & pressure up to 600psi (0.5bbls) &RIH. Set down at 8823', pressure fell to 200 psi. Pushing down hole. Set down at 8834', popped free. Stop RIH at 8838'. Bleed off pressure. PU-40k, no returns. RIH - 25'/min, set down at 8853'. PU-38k. Set down at 8853'. Pump down coil. 1 bpm/2245psi. PU - 35k. set down at 8853', slight booble and set down 5k to 8855' - no pressure increase. 500# jar lick down. Stop pumping & set down 5k, bleed off pressure. PU - 42k & lost 2k. RIH - 20k. Set down at 8853', 1 k jar lick down. 13:05 - 13:50 0.75 FISH N DFAL WEXIT PU & cock jars. 1 k jar lick down. PU -50k & popped free. RIH - 21 k, set down at 8855'. Push down hole to 8867' - 10k down. Jar down 10k jar lick. PU 45k, jar up 2k, PU to 50k. RIH to 8874'. PU to 8861' - 45k & sit. Pressure up backside to 750 psi (lbbl), jars went off. PU -lost 500psi of WHP, weight fell off- lost 7k. Keep PUH. Over pull at 8823'. Keep PUH. Over pull at 8779', 8772', continue to PUH. Pulling heavy at 8707', pressure up well to 750psi (1bbl). Popped free. Pulled heavy at 8622' 8592' 13:50 - 15:20 1.50 FISH N DFAL WEXIT Fill across top & POH. Pulled heavy & stop at 8525'. Pressure up backside to 750 psi. Move down hole. PU 43k & sit at 8527', jar lick. RIH & cock jars. PU to 50 at 8525'. RIH, WHP drops while RIH. PU & pressure well to 1000psi (1 bbl). Dump pressure. 3k jar lick. PU to 8524.6' @ 52k. RIH, cock jars. PU to 52k @ 8525'. 3k jar lick. RIH, cock jars. PU to 53k @ 8525'. Repeat. 12 jar licks up. Set down at 8534' w/ 10k, pressure up well (1 bbl). Jar lick down &RIH to 8597 & set down. PU 60'/min to 8525' (acts like swabbing). Jar up 8 times. Pressure up (1 bbl) & jar down twice. RIH & set down at 8596'. 15:20 - 15:40 0.33 FISH N DFAL WEXIT Wait at 8676' and let coil warm up & jars cool off. 15:40 - 15:45 0.08 FISH N DFAL WEXIT Put injector in high gear &PUH @ 90'/min. Saw a bunch of profiles, going to fast to write down. ~ 15:45 - 16:50 1.08 FISH N DFAL WEXIT POH filling across top. 3k overpull at 2110' -profile. PJSM while POH regarding handling BHA. 16:50 - 17:50 1.00 FISH N DFAL WEXIT Stop at 300'. Flow check well. Pop off. PUH to CTC. Put BHA ', in slips & dog collar. Undo BOT CTC & unstab from CTC. Place injector over bung hole. Stand back 4 stds of 2-3/8" PH6 tubing. PU rest of BHA. 17:50 - 18:00 0.17 FISH N DFAL WEXIT No fish. Overshot was heavily scarred on low side of tool. Large split & hole on bottom (3/4") of overshot. Approximately 4 collets left in hole, (1"x4") from overshot. Take pictures, discuss with WSL & town engineer. Ordered out Wireline. 18:00 - 19:45 1.75 FISH N DFAL WEXIT Talked to town and planned way forward. Wait on Wireline 19:45 - 23:00 3.25 FISH N DFAL WEXIT RU Wireline Unit 23:00 - 00:00 1.00 FISH N DFAL WEXIT RIH with 3.625" JB with 3.625 TS RIH and tagged the toa of the 4-1/2" stub at 8646 ft. Unabl to .POOH No recovery in junk basket Removed top 3.625" TS and RIH 11/4/2007 00:00 - 01:45 1.75 FISH N DFAL WEXIT RIH with JB Set down at 8,652 ft. The top of the 4-1/2" stump Working to get past Set down at 8,822 ft, PU and pulled 200 Ib over. RIH and. set down at 8.827 ft. Solid tao. DAYLIGHT SAVING TIME CHANGE 01:45 - 03:00 1.25 FISH N DFAL WEXIT POOH with junk basket. No recovery in junk basket. No extra marks on JB or stem. Printed: 12/t912007 2:44:18 PM BP EXPLORATION Page 6 of 40 Operations Summary Report Legal Well Name: 18-13A Common Well Name: 18-13A Event Name: DRILL+COMPLETE Contractor Name: NORDIC CALISTA Rig Name: NORDIC 2 Date From - To Hotars Task Code - NPT 11/4/2007 03:00 - 04:00 1.00 FISH N DFAL 04:00 - 05:45 1.75 FISH N DFAL 05:45 - 07:20 1.58 FISH N DFAL 07:20 - 08:06 0.77 FISH N DFAL 08:06 - 08:40 0.57 FISH N DFAL 08:40 - 08:55 0.25 FISH N DFAL 08:55 - 10:00 1.08 FISH N DFAL 10:00 - 11:00 1.00 FISH N DFAL 11:00 - 11:35 0.58 FISH N DFAL 11:35 - 11:40 0.08 FISH N DFAL 11:40 - 12:20 0.67 FISH N DFAL 12:20 - 13:00 0.67 FISH N DFAL 13:00 - 13:30 0.50 FISH N DFAL 13:30 - 15:30 2.00 FISH N DFAL 15:30 - 16:30 1.00 FISH N DFAL Spud Date: 11/3/1987 Start: 10/27/2007 End: 11/7/2007 Rig Release: 12/9/2007 Rig Number: Phase Description of Operations WEXIT RD wireline WEXIT PU milling BHA 3.79" mill & 3.79" string reamer with 8 jts of 2-3/8" PH6 Install CTC, Pull test to 40k and PT to 3500 psi. WEXIT RIH. Mix to-vis sweep in pill pit. Clean ditch magnets. WEXIT WT ck = 33k @ 8400' pumps off. WT ck = 32k @ 8500' 2.3bpm/3300psi. Tap at 8500' mill/back ream section until clean @ 0.5'/min (300psi motor work)- profile at 8518'. RIH @ 15'/min looking for next set down. Motor work at 8567'- profile at 8583', work area until clean. Motor work at 8628'- overshot at 8644', work area until clean. Pump 5 bbl of to-vis sweep. WEXIT Stalll at 8630'- overshot, clean PU. Mill/back ream section until clean. Stall 8628'. Pump 5 bbls to-vis followed by 5 bbls hi-vis pill. RIH to 8820' & no tag. WEXIT Back ream from 8820' @ 10'/min. Motor work at 8711'. Motor work at 8681'. Bottom's up from to-vis pill revealed rubber pieces & milled up brass & metal pieces. WEXIT RIH to bottom. @ 8820', let pill come out of mill & back ream. Motor work @ 8711', work area. Back ream up. Motor work @ 8681', work area -major problem area w! lots of motor work. WEXIT RIH from 8670' to 8685' - no motor work while RIH. PU @ 6'/min through area. Large pieces of rubber 2"x3", 3 in total from BU, samll milled up pieces of brass & metal. Back ream from 8685' to 8627'. Motor work at 8627', work area. Pump 5bbl to-vis & 5 bbl hi-vis sweep. Motor work at 8529' & 8499', 8490' WEXIT Mill down @ 10'/min. Bottom's up rerevealed large pieces of rubber 3"x3" 3 in total, pieces of composite plug, large milled up brass pieces & metal pieces, clean ditch magnets -large square pieces of metal. Slight motor work at 8494', 8502', 8532', 8597',8715'. WEXIT Sto at 8820'. Turn pumps off. RIH & tag. Set down (3k) at 8830' but popped through. RIH. 8880' set down & keep pushing & het down at 8886' (5k). WEXIT Start pumping 2.3bpm/3230psi. Pump 5 bbl of to-vis & 5 bbls of hi-vis. PU & look for motor work -clean. RIH to 8875'. Turn pumps off & tag fish @ 8888'. PU to 8875 & pressure up backside to 750 psi. RIH & tag fish. Push to 8892'. Bleed off pressure - WHP didn't change. Pump down coil while slowly PUH to get pill out of coil. WEXIT Pump pill from 8875' & chase it out of hole @ 17'/min. Slight motor work at 8711'.,8590', 8530'. PUH to 8500'. WEXIT Turn pumps off &RIH to 8742'. Set down at 8742'. PU clean. RIH - no more set downs. WEXIT Start pumping 2.4bpm/3500psi. Rubber pieces & small chunks of metal (banding) coming across the shaker. --71bs of metal debris hitting the out MM all at once, big increase in density, inspect shaker -metal cuttings & metal hairballs. POH to surface. PJSM while POH regarding handling BHA. WEXIT Tag up. Flow check well. Pop off. Unstab from BHA. Place injector over bung hole. Stand back 4 stds of 2-3/8" PH6 tubing. PU rest of BHA. Milk motor. Mill is 3.73" No Go, string reamer is 3.75" No Go. Printed: 12/19/2007 2:44:18 PM ~ ~ BP EXPLORATION Page 7 of 40 Operations Summary Report Legal Well Name: 18-13A Common Well Name: 18-13A Spud Date: 11/3/1987 Event Name: DRILL+COMPLETE Start: 10/27/2007 End: 11/7/2007 Contractor Name: NORDIC CALISTA Rig Release: 12/9/2007 Rig Name: NORDIC 2 Rig Number: Date From - To Hours Task £ode NPT Phase Description of Operations 11/4/2007 16:30 - 17:50 1.33 FISH N DFAL WEXIT PJSM regarding PU BHA. PU BOT box tap overshot BHA. Torque all connections. PU injector. MU coil to BHA. Stab onto well. 17:50 - 19:50 2.00 FISH N DFAL WEXIT RIH to 8870 ft 19:50 - 21:45 1.92 FISH N DFAL WEXIT Wt check at 8870 ft = 33.7/34.5 wo pump. RIH and tagged at 8893 ft Inc pump to 1.5 bpm and Pp inc 3,500 psi. No stall. PUH 4k allow jars go off, NO, PUH to 6k and jars didn't go off. Cycled and PU to 8 k over and pop off. Worked Box tap and was unable to get rolled over lip. Tried PUH and RIH from 8,888 ft to 8,893 ft at 0.05 ft per stage. 3.625" Box tap is riding up on the tray of the WS. Motor constant = 0.26 gal/rev Tried several things and was unable to get the BT over the TOWS Worked slowly down and saw 500 psi Pp inc at 8893.08 ft No stall. Tried to latch without success. Tried more wt and higher Qp still unable to latch 21:45 - 23:35 1.83 FISH N DFAL WEXIT POOH to look at Box Tap 23:35 - 00:00 0.42 FISH N DFAL WEXIT Stood back 4 stds 2-3/8" PH6 11/5/2007 00:00 - 01:00 1.00 FISH N DFAL WEXIT LD box tap No evidence the whipstock was inside the box tap. The mule shoe art of the box to is com letl missin .Sent pictures to town. Clean floor and low WFT fishing motor and 3.80" Box Tap in the Pipe shed 01:00 - 02:15 1.25 FISH N DFAL WEXIT PU BHA, Changed out Box tap, motor and accelerator 02:15 - 03:45 1.50 FISH N DFAL WEXIT RIH with 3.8" box tap 03:45 - 06:00 2.25 FISH N DFAL WEXIT Wt check at 8500 ft. 33.6 k. RIH and had to work the Box Tap through X nipple at 8518 ft and Packer at 8548 ft. RIH Worked through X nipple at 8583 ft RIH and tagged and stall at 8894.30 ft. Working the box tap over the WS 06:00 - 07:10 1.17 FISH N DFAL WEXIT Jar down 6 times. Jar up & pops off fish. Pressure up backside. Jar up, still have hold of fish. Pump down coil & jar down. 3 licks down, keep WHP at 1500psi &WHP dropped to 900psi. Fish moving down hole. Pressure WHP to 1500psi & jar lick down. WHP dropped to 900 psi. Bleed of pressure & pump down coil. 1.5bpm/2900psi, keep there for 2 min, pressure is coming down & weight is coming up -packer is spinning. Reduce rate to 0.75bpm/1950psi. Slowly close choke to maintain -500psi. Top of fish at 8899.8' with neutral weight. Stacking weight, pressure up WHP to 1000psi. 07:10 - 09:30 2.33 FISH N DFAL WEXIT Pump down backside at 0.25bpm/1700psi. Fish at 8935.8' (packer is catching collars). PU to 45k &RIH at 70'/min keeping WHP constant at 1800 psi. Repeat as necessary. Occasionally bleed off WHP & pump down coil to spin fish & also warm up coil 0,75bpm/2100psi. 09:30 - 10:30 1.00 FISH N DFAL WEXIT Beat down on fish at 9061'. Try to pressure up on the WHP & coil. Try to spin past tight spot -motor in stall position. Mix up lubricious pill in pill pit. Jar down 44 times - no movement. Jar up 2 times. Pulled free of fish. 10:30 - 11:35 1.08 FISH N DFAL WEXIT Pump tube pill down coil. 0.75bpm/1780psi. 1.5bpm/2400psi. 11:35 - 13:30 1.92 FISH N DFAL WEXIT Pump 10 bbls of tube pill out coil. Close choke & pressure up backside. Injecting at 0.42bpm/1575psi, inject 5 bbls past fish. Bleeb off WHP, cir down coil & try to latch fish. Latched fish. Jar down 4 times. Slipped off while trying to cock jars. Attempt to latch fish again. latched, beat down 45 times. Jar up twice. Pulled off. Printed: 12/19/2007 2:44:18 PM BP EXPLORATION Page 8 of 40 IOperatons Summary Report Legal Well Name: 18-13A Common Well Name: 18-13A Spud Date: 11/3/1987 Event Name: DRILL+COMPLETE Start: 10/27/2007 End: 11/7/2007 Contractor Name: NORDIC CALISTA Rig Release: 12/9/2007 Rig Name: NORDIC 2 Rig Number: Date From - To Hours Task ..Code NPT Phase: Description of Operations 11/5/2007 13:30 - 16:00 2.50 FISH N DFAL WEXIT Pulling heavy. POH filling across top. PJSM while POH regarding BHA handling. 16:00 - 17:20 1.33 FISH N DFAL WEXIT Pop off well, PUH inspecting the CT for ovality problems and physical damages. Stand back 4 stds of 2-3/8" PH6 tubing. Break off lower section of BHA. BOT pull disconnect has released from BHA. Discuss with town. 17:20 - 23:15 5.92 FISH N DFAL WEXIT Loaded 10 DC in pipe shed. prep and tally. RU and cut off 120 ft CT, Installed BOT's CTC and pull tested to 45k and PT to 3500 psi. PU BHA #11 Stab on well with injector 23:15 - 00:00 0.75 FISH N DFAL WEXIT RIH WT check at 8500 ft = 40.7k1b 11/6/2007 00:00 - 02:15 2.25 FISH N DFAL WEXIT RIH and tagged the top of the fish at 9053 ft with hydraulic GS. PU and fish is latched. Set down and try and jarring up with low string wts Jarring down. Pressured up on the annulus to 500 to 1000 psi while jarring down on fish. SD after 15 jars and heat up CT and cool jars. 02:15 - 04:35 2.33 FISH N DFAL WEXIT RIH after 38 jar licks and removing the wellhead pressures. Set down again at 9,109 ft Jarring down through 4-1 /2" collars. Spent a lot of times at 9234 ft ("X" Nipple ). With over 100 licks, 9,381 coil life is at 49 % fatigue. 04:35 - 07:00 2.42 FISH N DFAL WEXIT POOH to cut pipe. Need to cut 400 ft which will leave us 14,337ft and 500,000 running feet. PJSM while POH regarding handling BHA. 07:00 - 09:30 2.50 FISH N DFAL WEXIT Flow check. Pop off well. Place injector over bung hole & circulate. Stand back 4 stds of 2-3/8" PH6 & 5 stds of 3-1/8" drill collars in the derrick. Pull BHA to surface. Inspect GS for wear -minor wear to GS, dogs are rolled but very minor, small piece of brass in skirt -other wise in good condition. Fill hole 1bbl. Clean up RF of BOT tools. Discuss plan forward with town -cease fishin ops (plan to set whip, begin Mill/FCO ops. Call for 3.80" DS 331 mill. Swap out elevators to PU 2-3/8" PH6 tubing. PJSM regarding handling BHA. Function test BOPE, weekly test per AOGCC. 09:30 - 11:00 1.50 FISH N DFAL WEXIT PU mud motor & spin to verify. MU 3.80" DS 331 PBM w/ 3.80" string reamer, 2-7/8" MM,CS, Disco, Jars, DCV's & 4 stds 2-3/8" PH6 tubing (torque all connections to spec). PT CS & Disco on work bench to 4k -good. Inspect BOT CTC. 11:00 - 17:30 6.50 FISH N DFAL WEXIT Set counters &RIH. Wt check at 8500 ft 36.5k. Inc Op to 2.00 bpm and R1H cleaning out "X" Nipple area Mini stall and took wt at 9,000 ft ? Pumping 140kLSRV down hole and cleaned up, didn't see the 2nd time through it. RIH to 9210 ft, wt check = 36k, SD and dry tagged top of fish at 9233 ft. Circulated at 2.5 bpm CTP at 3600 psi sweep down and chase out of hole. PUH to 7000 ft and RIH at 90 fpm pumping sweep # 3 to 9230 f. Pumped 4th sweep, RIH and chased up hole. Dropped 1/2 ball 17:30 - 19:30 2.00 FISH N DFAL WEXIT Displace 1/2' ball to cir sub and open same with 4000 psi. POOH jetting mandels. Picked up some trash while jetting the GLM at 6225 ft. Pumped 20 bbl sweep, PUH. chasing it to surface. Hold PJSM to discuss handling BHA. 19:30 - 21:00 1.50 FISH N DFAL WEXIT At surface. Stand back PH6 pipe. Lay down tools. Make up swirl nozzle BHA. Get on well. 21:00 - 23:00 2.00 CLEAN N DFAL WEXIT Run in hole. 23:00 - 00:00 1.00 CLEAN N WEXIT Wash across each GLM. Pump 20 bbl hi vis sweep once on Printetl: 12/19/2007 2:44:18 PM • BP EXPLORATION Page 9 of 40 Operations Summary Report Legal Well Name: 18-13A Common Well Name: 18-13A Spud Date: 11/3/1987 Event Name: DRILL+COMPLETE Start: 10/27/2007 End: 11/7/2007 Contractor Name: NORDIC CALISTA Rig Release: 12/9/2007 Rig Name: NORDIC 2 Rig Number: Date From - To Hours Task Code NPT 'Phase Description of Operations 11/6/2007 23:00 - 00:00 1.00 CLEAN N WEXIT bottom. 11/7/2007 00:00 - 03:00 3.00 CLEAN N DFAL WEXIT Continue to wash GLMs with nozzle assembly. Circulate hi vis sweep and chase out of hole. 03:00 - 04:00 1.00 CLEAN N DFAL WEXIT Rmove nozzle. Make up venturi assembly. Get on well. 04:00 - 07:15 3.25 CLEAN N DFAL WEXIT Run in hole. Ran 2-10 bbl and 1-20 bbl sweep while working venturi basket from 8500 ft to 9223 ft POOH while pumping at 3.00 bpm 07:15 - 11:30 4.25 CLEAN N DFAL WEXIT Stand back PH6 and break down venturi basket. Broke down basket and recovered a couple of small pieces of metal. LD venturi basket PU Dummy WS and DC and PH6 tubing 11:30 - 14:48 3.30 CLEAN N DFAL WEXIT RIH with Dummy Whipstock. Tagged at 9,240 ft CTMD. 14:48 - 17:00 2.20 CLEAN N DFAL WEXIT LD 2-3/8" PH6 tubing and 10-3" DC and dummy whipstock 17:00 - 17:30 0.50 WHIP N DFAL WEXIT Held PJSM on pumping slack 17:30 - 18:30 1.00 WHIP N DFAL WEXIT Rig up. Reverse circulate to pump a-line back in to reel. Heard lots of movement insdie pipe. 18:30 - 21:30 3.00 WHIP N DFAL WEXIT Cut 440' of coil and 36' of wire. Re-head coil connector. Pull and pressure test same. Continuity good. 21:30 - 22:30 1.00 WHIP N DFAL WEXIT Hold PJSM to discuss handling BHA. MU whip stock and settin tools. Scribe to Inteq orienter. Stab coil. Get on well. 22:30 - 00:00 1.50 WHIP N DFAL WEXIT Open EDC. Run in hole.18k# do wt, 34k# up wt at 8700'. RIH to tie in depth. 11/8/2007 00:00 - 00:30 0.50 WHIP N DFAL WEXIT Continue to RIH with whipstock. Losing 3 bbls mud per 1000' initially, then began to get proper hole fill. 00:30 - 00:45 0.25 WHIP N DFAL WEXIT Log gr tie in from 9,125'. Subtract 6' correction. 00:45 - 02:00 1.25 WHIP N DFAL WEXIT Log CCL tie in from 8500'. On depth with PDC log. Collars running about 13' deep compared to tubing detail. Tbg collar at 9190'. Set TOW /tray top at 9200'. 02:00 - 02:15 0.25 WHIP P WEXIT Close EDC. Orient for tray face to low side. Pressure coil to 3950 psi. Tool sheard, whipstock appears to be set. 34.5 k# up wt. 02:15 - 03:45 1.50 WHIP P WEXIT Circulate out of hole. 03:45 - 04:30 0.75 WHIP P WEXIT Lay down Baker whipstock setting tools and other Inteq mwd tools. 04:30 - 05:15 0.75 STWHIP P WEXIT Pick up window milling BHA including string reamer and two jts of PH6 pipe. 05:15 - 08:00 2.75 STWHIP P WEXIT RIH with Milling BHA. Removed Injector cage on driller side for repairs Some wt bobbles at 8,315 ft and 8,515 ft and 8,719 ft 08:00 - 15:10 7.17 STWHIP P WEXIT Milling dual dual casing window as per RP from 9200 ft to 9400 ft Op = 2.48 / 2.49 bpm at 3400 psi on btm CTP = 3615 psi Time drill at 0.1 fU 6 min. DHWOB = 3-4k 15:10 - 15:30 0.33 STWHIP P WEXIT PU to achieve updated off bottom pressures. 15:30 - 18:00 2.50 STWHIP P WEXIT Milling dual casing string window from 9200 ft Off bottom P = 3300 psi Op = 2.50 / 2.50 psi CTP = 3560 psi on bottom DHWOB at 4k 18:00 - 22:30 4.50 STWHIP P WEXIT Continue to mill window from 9206'. Pick up to check WOB etc. RIH. Stack weight at 9205.6'. Resume time drilling from this depth. 3300 psi fs at 2.50 bpm in/out. 3500 psi on btm. 4.5 k# DHWOB. Printed: 12/1912007 2'44:18 PM • ` BP EXPLORATION Page 10 of 40 Operations Summary Report Legal Well Name: 18-13A Common Well Name: 18-13A Spud Date: 11/3/1987 Event Name: DRILL+COMPLETE Start: 10/27/2007 End: 11/7/2007 Contractor Name: NORDIC CALISTA Rig Release: 12/9/2007 Rig Name: NORDIC 2 Rig Number: Date From - To Hours Task Code NPT Phase Description of Operations 11/8/2007 22:30 - 00:00 1.50 STWHIP P WEXIT PU off bottom. Mill slowly back down to 9207.6' 3350 psi fs at 2.51 in/out. Continue to mill ahead to 9208.2. 6.5k# DHWOB. Cleaning magnets every hours. Lots of fine metal cuttings on 11/9/2007 00:00 - 03:00 3.00 STWHIP P WEXIT shaker. Continue to mill window from 9208'. Through casing at 9209'. Drill formation to 9219'. Estimated TOW: 9202', BOW: 9211'. RA marker at 9211'. 03:00 - 07:15 4.25 STWHIP P WEXIT Dress window with several up and down passes. One spot shows motor work, at 9208' on down pass. Made dry tag at 9,219 ft, clean window at this point 07:15 - 10:10 2.92 STWHIP P WEXIT Open EDC, POOH to PU build section BHA. Small wt bobbles at 7900 and 7300 ft Pulled tight at 3018 ft RIH and unplugged Micro motion. POOH, tagged up and RIH at 100 fpm to clean up solids. Not much extra solids observed. Installe Injector cage while circulating well 10:10 - 11:55 1.75 STWHIP P WEXIT Unstab injector and LD milling BHA. Wait on BHI to MU tool and test. MU tool and stab on well with injector. 11:55 - 13:25 1.50 DRILL P PROD1 RIH with EDC closed 13:25 - 13:40 0.25 DRILL P PROD1 Log tie in starting at 9110 ft (9108ft to 9122 ft interval) Correction at -5 ft 13:40 - 13:50 0.17 DRILL P PROD1 RIH with TF orient. Tagged bottom at 9220 ft Clean window Good Job Roger Smith and BOT PUwt = 37.5k1bf. Bring pump up to 2.6 bpm at 3220 psi free spin 13:50 - 16:35 2.75 DRILL P PROD1 Drilling Build Section TF at 180 TF Zone IV & Zone III (9340 ft) CTP = 3220 / 3435 psi DHWOB = 1.5klbf ROP = 28 to 100 fph Vp = 308 bbl BHP = 4757 psi with EDC of 10.23 ppg Found the RA Marker initially at 9211 ft, TOWS at 9202 ft 16:35 - 16:50 0.25 DRILL P PROD1 Wiper trip at 9350 ft 16:50 - 17:15 0.42 DRILL P PROD1 Log tie-in and confirm RA Marker 9211 ft TOWS = 9,202ft TOW = 9,202 ft RA Marker = 9,211 ft BOW = 9,211.45 17:15 - 19:30 2.25 DRILL P PROD1 Drilling Build Section TF at 180 TF Zone III (9340 ft) CTP = 3460 / 3435 psi DHWOB = 1.5klbf ROP = 32 to 100 fph Vp = 312 bbl BHP = 4818 psi with EDC of 10.30 ppg. Swap from pump #1 to #2. 19:30 - 00:00 4.50 DRILL P PROD1 Drilling build section. 3320 psi fs at 2.56 in/out. 150-300 DPSI. 0.5 - 1.Ok# WOB. ROP: 15-30 fph. Continue in Zone 3. BHP/ECD/PVT: 4431/ 10.2 ppg / 309 bbls. NB INC: 27.6 deg. 11/10/2007 00:00 - 07:00 7.00 DRILL P PROD1 Continue to drill build/tangent section. 3300 psi fs at 2.38 in/2.35 out. 150-350 dpsi mtr work. 1.5-3.Ok# WOB. ROP: 15-20 fph. Still in Zone 3. Several stall and drilling is slow Printed: 12/19/2007 2:44:18 PM B'P EXPLORATION Page 11 of 40 Qperations Summary Report Legal Well Name: 18-13A Common Well Name: 18-13A Spud Date: 11/3/1987 Event Name: DRILL+COMPLETE Start: 10/27/2007 End: 11/7/2007 Contractor Name: NORDIC CALISTA Rig Release: 12/9/2007 Rig Name: NORDIC 2 Rig Number: Date From - To Hours Task Code NPT Phase Description of Operations 11/10/2007 07:00 - 09:30 2.50 DRILL P PROD1 POOH, Open EDC and circulated at 3.7 bpm while POOH. Blow down MM at 250 ft from surface. Jogged at surface to 500 ft. Held PJSM on handling BHA. Inspected the last 150 ft coiled tubing. 09:30 - 10:30 1.00 DRILL P PROD1 Handle BHA. Changed out motor and bit. BC pulled was rung out on the BC nose. 10:30 - 12:00 1.50 DRILL P PROD1 RIH with directional BHA 12:00 - 12:15 0.25 DRILL P PROD1 Log tie-in at 9125 ft at 150 fpm. Corrected -6 ft 12:15 - 12:30 0.25 DRILL P PROD1 Close EDC Orient TF to 180 deg and RIH past WS. RIH PU weight 35.5k1bf 12:30 - 16:32 4.03 DRILL P PROD1 Drilling base Zone III and Top of Zone II TF at 15 RHS CTP = 3430 / 3500 psi Qp = 2.80/ 2.79 bpm BHP = 4875 psi at 10.30 ppg Vp = 278 bbls DHWOB = 1.00 ROP 10-40 fph Still ratty drilling in upper Zone II and shale stringers 16:32 - 19:30 2.97 DRILL P PROD1 Started mud swap. Drilling at better rate since 9500 ft with only 3 stalls ROP at 30 fph Drilling Zone II TF at 15 RHS CTP = 3430 / 3500 psi Qp = 2.80/ 2.79 bpm BHP = 4875 psi at 10.30 ppg DHWOB = 1.00 ROP 20-40 fph PU off btm to get a survey. 19:30 - 22:00 2.50 DRILL P PROD1 Continue to drill Zone 2. 2900 psi fs at 2.6 in/2.6 out. 100-300 psi mtr work. 0.5-1.5k# WOB. BHP/ECD/PVT: 4449/10.0/389 bbls. Mud swap complete, Continue to see frequent stalls. ROP from 10-30 fph. INC: 49 deg. Not sure where we are going to land yet. Check valves on pump #1. No problem found. Lost partial returns at 9645'. May have crossed a fault. Losses healed quickly. 22:00 - 22:45 0.75 DRILL P PROD1 Wiper trip to 9220'. Hole smooth. 22:45 - 00:00 1.25 DRILL P PROD1 Drill ahead. 2950 psi fs at 2.60 in/2.57 out. 200-350 psi mtr work. 0.5-1.5k#WOB. ROP increasing. May be out of the Zone 2 hard spot. Still stalling every now and then. 11/11/2007 00:00 - 04:00 4.00 DRILL P PROD1 Continue to drill ahead in hard stuff. Frequent stalls. 3150 psi fs at 2.64 in/2.62 out. 200-350 psi mtr work. 1.5-2.5k# WOB. ROP increased to 40-60 FPH. Continue to increase angle for landing build. Slow mud loss to formation: Aprroximately 50 bbls in last 12 hrs. 04:00 - 04:45 0.75 DRILL P PROD1 Wiper trip to window. Hole smooth. 04:45 - 06:20 1.58 DRILL P PROD1 Drill ahead from 9,850'. 06:20 - 07:20 1.00 DRILL P PROD1 Having trouble getting weight on Bit, solids Wiper trip 07:20 - 10:00 2.67 DRILL P PROD1 Drilling Zone II TF at 15 RHS Printed: 12/19/2007 2:44:18 PM BP EXPLORATION Page 12 of 40 Operations Summary Report Legal Well Name: 18-13A Common Well Name: 18-13A Spud Date: 11/3/1987 Event Name: DRILL+COMPLETE Start: 10/27/2007 End: 11/7/2007 Contractor Name: NORDIC CALISTA Rig Release: 12/9/2007 Rig Name: NORDIC 2 Rig Number: Date From - To Hours Task Code NPT Phase. Description of Operations 11/11/2007 07:20 - 10:00 2.67 DRILL P PROD1 CTP = 3400/ 3600 psi Op = 2.73/ 2.62 bpm BHP = 4897 psi at 10.11 ppg DHWOB = 1.00 ROP 20-40 fph. Having trouble getting WOB, not cleaning the hole as needed 10:00 - 12:40 2.67 DRILL P PROD1 PUH and open EDC above WS. Op = 3.8 bpm POOH to change AKO setting, present DLS averaging 10deg/100 ft Checked the last 100 ft of CT and found a flat spot on CT at 70 ft 0.225" to 0.156" LD tools 12:40 - 15:00 2.33 DRILL P PROD1 Cut off 100 ft CT. Installed and dimpled CTC. Pull tested to 40 k and re-tighten. PT UOC to 3500 psi 15:00 - 15:45 0.75 DRILL P PROD1 PU HYC bit, motor set AKO to 0.90 and Coiltrac 15:45 - 17:30 1.75 DRILL P PROD1 Run in hole. 17:30 - 17:50 0.33 DRILL P PROD1 Tie-in at 9,125 ft corrected. Corrected -6 ft, SD pump and close EDC, orient TF to 180 deg 17:50 - 18:15 0.42 DRILL P PROD1 RIH. Tag bottom at 9976'. 18:15 - 20:45 2.50 DRILL P PROD1 Drill ahead from 9976'. Drill ahead from 9976. 3300 psi fs at 2.60 in/2.47 out. 200-350 psi mtr work. 1.5-2.5k# WOB. BHP/ECD/PVT: 4638 psi/10.26 ppg/268 bbls. ROP 40-60 fph. Continue slow TVD drop with INC at 88-90 deg. Target 8700 at 10,500'. 20:45 - 21:45 1.00 DRILL P PROD1 Wiper trip to window at 25 fpm circulating at 2.62 bpm. 21:45 - 00:00 2.25 DRILL P PROD1 Drill ahead 3450 psi fs at 2.64 in/2.52 out. 200-400 psi mtr work. 1.5-2.5k# WOB. ROP: 100+ FPH Cuttings build up reducing ability to slide ? Make a few short wiper trips (100'). 11/12/2007 00:00 - 02:30 2.50 DRILL P PROD1 Pull out of hole to change motor AKO. Getting essentially no dogleg turn to left with 0.9 deg setting. Will run out of polygon soon. 02:30 - 03:30 1.00 DRILL P PROD1 AT surface. Get off well. Adjust motor angle to 1.1 deg AKO. Bit in good condition. Get back on well. 03:30 - 06:10 2.67 DRILL P PROD1 Run in hole with lateral drilling assembly. Tied in at 9125 ft and corrected -5 ft. Closed EDC and orient TF to 180 deg. 06:10 - 07:00 0.83 DRILL P PROD1 RIH tagged bottom at 10244 ft 07:00 - 10:10 3.17 DRILL P PROD1 Drilling lateral 7F @ 90-120LHS Op = 2.53 / 2.39 bpm CTP 3105 / 3475 psi Vp = 298 bbls, Added 100 bbl of new flo-pro to mud sysytem Vp = 286 bbis DHWOB / DHP = 2.5k / 4632 psi ECD = 10.8ppg ROP 15-90 fph Presently tossing 0.2 bpm = 12 bph = 288 bpd Possible fault at 10,244 ft. Hole cleaning and WOB might becoming an issue. Getting a lot of DH vibration. Made BHA wiper at 10, 291 ft- 10:10 - 10:25 0.25 DRILL P PROD1 Drilling lateral TF @ 130 LHS Printetl: 12/19/2007 2:44:18 PM ~ ~ BP EXPLORATION Page 13 of 40 Operations Summary Report Legal Well Name: 18-13A Common Well Name: 18-13A Event Name: DRILL+COMPLETE Contractor Name: NORDIC CALISTA Rig Name: NORDIC 2 Date From - To Hours .Task Code NPT 11/12/2007 10:10 - 10:25 0.25 DRILL P 10:25 - 12:15 1.83 DRILL P 12:15 - 13:10 0.92 DRILL P 13:10 - 13:50 0.67 DRILL P 13:50 - 14:00 0.17 DRILL P 14:00 - 16:10 2.17 DRILL P 16:10 - 17:00 0.83 DRILL P 17:00 - 18:30 1.50 DRILL P 18:30 - 21:00 2.50 DRILL P 21:00 - 23:45 2.50 DRILL P 23:45 - 00:00 0.25 DRILL N RREP Spud Date: 11/3/1987 Start: 10/27/2007 End: 11/7/2007 Rig Release: 12/9/2007 Rig Number: Phase- Description of Operations PROD1 Qp = 2.44 / 2.35 bpm CTP 3105 / 3375 psi Vp = 387 bbls, Added 100 bbl of new flo-pro to mud sysytem DHWOB /DHP = 1.5k / 4566 psi ECD = 10.1 ppg ROP 15-90 fph PROD1 Wiper trip to window after drilling 100 ft PROD1 Drilling lateral TF @ 130 LHS Op = 2.48 / 2.43 bpm CTP 3000 / 3775 psi Vp = 371 bbls DHWOB /DHP = 2-3k / 4571 psi ECD = 10.1 ppg ROP 15-90 fph PROD1 Wiper to clean up cutting PROD1 Drilling lateral TF @ 90 LHS Op=2.45/2.38 bpm CTP 3050 / 3575 psi Vp = 361 bbls DHWOB /DHP = 2-3k / 4571 psi ECD = 10.15 ppg ROP 40-90 fph Still unable to get proper WOB. PROD1 PUH wiper trip. Having trouble with the pressure gauges on CCat and CTDS. Checked the pumps and restarted the SLB computer. Lost approximately 400 psi down hole? PUH, pull tight coming in the whipstock area. Stopped and RIH with increasing the Op. Wash up solids in WS area. PUH and surged the area above WS. Opened the EDC, PUH at 2.70 bpm at 30. fpm Pulled to 8000 ft. RIH at 100 fpm surging solids out of hole. Logged tie-in at 9130 ft (+4 ft correction) PROD1 RIH test driving MP1 Lost 100 psi while RIH at 10,000 ft RIH and tagged bottom at 10,409 ft PROD1 Drilling TF at 90 LHS Op = 2.83 / 2.73 bpm CTP 3442 psi off bottom Vp = 330 psi DHWOB = 2-4k Ibf BHP = 4642 psi EDC 10.26 ppg Conducting mud swap ROP slow once back on bottom for 20', then increased again. Logs show a shale of 200+ API. This is likely Kavik. And the fault we have been looking for has been crossed. ROP increased again indicating we may be back into Zone 1. PROD1 Complete mud swap while drilling ahead. Current TVD is 8706.5'. Directional plan is to climb to 8705' - 8700' and remain flat. 3150 psi fs at 2.81 in/2.78 out. Having trouble maintaining smooth weight transfer. Unable to keep bit drilling without losing dill pressure or WOB. PROD1 Wiper trip to 8000' w/ EDC open above window. Circ at 4 bpm at 4000 psi with both pumps. Did not a significant increase in cuttings with btms up from 8000'. Close EDC at 9190'. Run back in hole to bottom. PROD1 Swab on pump #2 leaking. Pull back into casing. Printed: 12/19/2007 2:44:18 PM BP EXPLORATION Page 14 of 40 Operatioins Summary Report Legal Well Name: 18-13A Common Well Name: 1 8-13A Spud Date: 11/3/1987 Event Name: DRILL+COMPLETE Start: 10/27/2007 End: 11/7/2007 Contractor Name: NORDIC CALISTA Rig Release: 12/9/2007 Rig Name: NORDIC 2 Rig Number: Date From - To Hours Task Code NPT Phase Description of Operations 11/12/2007 23:45 - 00:00 0.25 DRILL N RREP PROD1 Circ at min rate with pump #1. Lock out and test lock out on pump #2. Replace swabs on #2. 11/13/2007 00:00 - 01:30 1.50 DRILL N RREP PROD1 Continue to replace swabs on pump #2. Circ at min rate above window at 9191'. Test pump #2. 01:30 - 02:15 0.75 DRILL P PROD1 Run in hole. Circ at 2.7 bpm at 2911 psi. 02:15 - 06:00 3.75 DRILL P PROD1 Drill ahead from 10,493'. 06:00 - 07:00 1.00 I DRILL ( P 07:00 - 09:33 2.55 DRILL P 09:33 - 10:50 1.28 DRILL P 10:30 - 16:00 I 4.501 BOPSUR P 16:00 - 16:15 I 0.251 STKOH I C 16:15 - 17:30 I 1.251 STKOH I C 17:30 - 20:10 I 2.67) STKOH I C 20:10 - 20:30 0.33 STKOH C 20:30 - 21:10 0.67 STKOH C 21:10 - 21:20 I 0.171 STKOH I C 11/14/2007 100.00 - 01:00 I 0.00) STKOH I C 01:00 - 03:10 I 2.171 STKOH I C 03:25 - 04:25 O.00I STKOH I C 04:25 - 06:00 I 1.581 STKOH I C 06:00 - 09:30 I 3.501 STKOH I C 2900 psi fs at 2.71 in/ 2.65 out. 300-400 psi mtr work. 2-4k# WOB. BHP/ECD/PVT: 4466/9.77 ppg/346 bbls. Rop varying from 10 to 100 fph. Bit may be getting balled up with clay material. Having to pick up frequently and run into btm to keep drilling ahead. PROD1 POOH for BOP test PROD1 Above the WS, inc Op to 4.00 bpm and POOH PROD1 OOH, LD BHA and PT CT and UOC to 3500 psi. OK Tested inner reel valve to 250 / 3500 psi. Set injector in hole and make ready to conduct BOP test PROD1 Make ready to PT BOP's. Held PJSM on PT BOP's. PROD1 Pressure test all BOP equipment, as per Drilling permit and SOPs. Test witness waived by L. Grimaldi, AOGCC. PROD1 Hold PJSM with all hands. Discuss handling tools and potential hazards. PROD1 MU Baker billet assembly and setting tool. MU and scribe to Inteq BHA tools. Stab coil. Test tools. Get on well. PROD1 Run in hole w/ BHA #22 at 60'/min circ thru EDC 0.44/1000 PROD1 Log tie-in down from 9120', corr -6' PROD1 RIH w/ WS to 9215' where wt loss occurred. Work a few times before getting WS thru the BOW. RIH thru OH 0.44/1050 w/ a few wt loss spots in known shale areas to 10241' PROD1 Close EDC. Park w/ CT in tension w/ toa of billet at 10230' and 308 TF. Start pump and see anchor set at -1700 psi, sheared setting tool at 3920 psi and see 5.7k wob PROD1 POH thru OH 1.5/1700, clean. POOH PROD1 Inspect 100' CT above BHA PROD1 LD WS setting BHA MU sidetrack drilling BHA PROD1 RIH w/ BHA #23 (3.75" STR335 w/ 2.0 deg motor) circ 0.45/800 thru EDC PROD1 Log tie-in down from 9125', corr -6'. Close EDC PROD1 RIH thru window, clean. Precautionary ream 2.05/2300/DTF @ 20'/min to 10220' was clean. Tag WS at min rate at 10230'. PUH 40k, start motor 2.56/2.44/2890 PVT 258 PROD1 Ease in hole 2.56/2.44/2900/308 and first MW at 10228.7'. Time/feel drill 0.1'/3 min avg. Having trouble sliding, so doing frequent pickups. Also, work w/ pump rate and ream and backream up to 10200' to get BHA to slide PROD1 Wlper trip to window while waiting on 150 bbls hi tube mud from ML Flo pro will have 3:5% 776 and 2.5% Lo-torque. Printed: 12/19/2007 2:44:18 PM • BP EXPLORATION Page 15 of 40 Operations Summary Report Legal Well Name: 18-13A Common Well Name: 18-13A Spud Date: 11/3/1987 Event Name: DRILL+COMPLETE Start: 10/27/2007 End: 11/7/2007 Contractor Name: NORDIC CALISTA Rig Release: 12/9/2007 Rig Name: NORDIC 2 Rig Number: Date From - To Hours Task Code NPT Phase Description of Operations 11/14/2007 09:30 - 12:00 2.50 STKOH C PROD1 Tag billet at 10,230.9'. 2700 psi fs at 2.54 in/out. 18k# dn, 35k# up weight. Begin time milling to establish pattern on billet. New mud back to surface. TF: 28R. Time mill at 0.1' per 6 minutes. Unable to slide this way. Switch to auto drill mode at 5-10 FPH. This seems to be working. Maintaining 200-1000# WOB. Off billet. Drill ahead in formation. Slowly rotate TF to left. Drill ahead at 300 deg. NB inclination at 95 deg. 12:00 - 12:45 0.75 STKOH C PROD1 Backream new hole and up past billet. Make two passes. 12:45 - 15:30 2.75 STKOH C PROD1 Circulate out of open hole. Jog at window. Open EDC. Circ out of hole at 3.75 bpm @ 3600 psi. Hold PJSM for BHA work while POOH. 15:30 - 17:15 1.75 STKOH C PROD1 At surface. Get off well. Inspect coil for wear. Unstab coil. LD Inteq tools. MU BHA with USR resis tool (as per Inteq request). MU 1.1 deg x-treme mtr w/ re-run Hycalog bicenter bit. 17:15 - 19:40 2.42 DRILL C PROD1 Run in hole. Circ at min rate through bit. SWS install UTIM 19:40 - 19:55 0.25 DRILL C PROD1 Log tie-in down from 9125' circ thru bit 0.45/0.38/1060. Corr -5' 19:55 - 20:55 1.00 DRILL C PROD1 Wiper to 10200' 2.4/2750 Have trouble getting orientor to turn (work to move orientor 0.5 hrs). Hole was clean 20:55 - 21:05 0.17 DRILL C PROD1 Ream by billet 2.0/2440/DTF 10'/min and saw no MW. Tag TD at 10282' PVT 315 21:05 - 23:30 2.42 DRILL C PROD1 Drill from 10282' 2.53/2.47/3220/145L w/ 100-300 psi dill, 1-2.5k wob at 9.88 ECD w/ NBI initial at 95 deg 60'/hr. New BHI resistivity tool is not giving anticipated values and seems to be switching on/off Drill into a formation change at 10370' and had numerous stalls and sticking. Drill to 10400' 23:30 - 23:50 0.33 DRILL C PROD1 Wiper to window was clean to 10256'. Slow down pulling speed to 10'/min at 10260' 38.5k 23:50 - 00:00 0.17 DRILL N STUC PROD1 Have 10k overpull at 10256'. Attempt to go back down hole and can't. T several times to o down hole 11/15/2007 00:00 - 01:10 1.17 DRILL N STUC PROD1 Can rotate orientor freely. BHA length is 80' and CTC is at 10175'. DTF at 10175'=160L, at 10230'=30R, 10255'=60L Assume BHA is stuck due to radical TF changes in a short interval from a 2.0 deg motor and by a few solids in corresponding low spot of 3.75" openhole. Hold 48k and circ 2.42/2.35/3200 for 30 min w/ no wt loss while pump hi-vis lubricious pill. Work pipe down, then up w/o success. Work pipe in 10k stages to 86k w/o movement either direction. Apply 500 psi whp and dump it w/ no pipe movement 01:10 - 03:15 2.08 DRILL N STUC PROD1 Hold 80k and circ 2.42/2.35/3210 while discuss. Order crude Review well kill and parted pipe procedures and conduct table top discussion Stack 15k surface wt and circ 2.39/2.34/3150 while wo crude 03:15 - 05:15 2.00 DRILL N STUC PROD1 MIRU LRS. VP =1.2 Safety mtg re: pump crude Try a couple more pulls at 90k w/o success LRS PT @ 3000. Load CT w/ 15 bbls 7.24# 72F dead crude 1.03/1700 Rig displace w/mud 2.4/3200 and put 5 bbls out the bit. Wait Printed: 12/19/2007 2:44:18 PM BP EXPLORATION Page 16 of 40 Operations Summary Report Legal Well Name: 18-13A Common Well Name: 18-13A Spud Date: 11/3/1987 Event Name: DRILL+COMPLETE Start: 10/27/2007 End: 11/7/2007 Contractor Name: NORDIC CALISTA Rig Release: 12/9/2007 Rig Name: NORDIC 2 Rig Number: Date From - To .Hours Task Code NPT Phase Description of Operations 11/15/2007 03:15 - 05:15 2.00 DRILL N STUC PROD1 10 min, then work pipe both directions at 90k w/o success. Pump 5 more bbls then wait 20 min. Work pipe both directions 05:15 - 05:45 I 0.501 DRILL I N I STUC I PROD1 05:45 - 08:00 I 2.251 DRILL I N I STUC I PROD1 08:00 - 09:00 I 1.001 DRILL I N I STUC I PROD1 09:00 - 13:00 I 4.00 I DRILL I N I STUC I PROD1 13:00 - 14:00 I 1.001 DRILL I N I STUC I PROD1 14:00 - 16:00 2.00 DRILL N STUC PROD1 16:00 - 16:15 0.25 DRILL N STUC PROD1 16:15 - 19:15 3.00 DRILL N STUC PROD1 19:15 - 19:30 0.25 DRILL N STUC PROD1 19:30 - 21:30 2.00 DRILL N STUC PROD1 21:40 - 22:10 0.50 DRILL N I STUC I PROD1 22:10 - 00:00 I 1.831 DRILL I N I STUC I PROD1 111/16/2007 100:00 - 01:30 I 1.501 DRILL I N I STUC I PROD1 01:30 - 02:20 I 0.831 DRILL I N 1 STUC 1 PROD1 02:20 - 03:30 I 1.171 DRILL I N I STUC I PROD1 Pull above billet, clean to 10220'. Start pump and displace remaining crude out of BHA. Begin wiper to window while chase crude to surface. RDMO LRS Pull thru window. Open EDC. POOH to remove URS and cut CT while circ thru EDC 2.6/3000. Hold PJSM in Ops cab to discuss handling BHA. At surface. Get off well. Unstab coil. LD tools. Found washout at UOC Rig up to pump slack. Reverse circulate at 3.5 bpm @ 3500 psi. Cut 120' of coil. Cut 55' of a-line. MU a-coil head. Test same for pull, pressure, and continuity. Circ one coil volume forward. MU 1.1 deg x-treme mtr with Hyc 3-3/4" DS49 bit. Stab coil. Test tools. Get on well. Run in hole. Circ through bit at minimum rate. Log GR tie in from 9125'. Subtract 6' correction. Make wiper trip in hole to 10,260'. Back ream up past billet at 60R. 3450 psi at 2.53 in. No mtr work. RIH. Back ream at 60R from 10,260'. No mtr work. Phz 1 1730 hrs Ream/backream 10250-280' 3 times at 30L TF and was clean Wiper to 10385', clean Log missing GR data 10385' to TD 2.41/3290 tagged at 10399' Drill from 10399' 2.42/2.34/3300/120L w/ 200-400 psi dill, 1-2.5k wob w/ 10.24 ECD at NBI 93.7 deg to target 8686'-8690'TVD. Drill to 10500' Wiper to window 2.42/3200 was clean to 10280' 38k Slow down pulling speed at 10280' from 25'/min to 10'/min and started pulling heavy (8k over). Attempt to go back down and couldn't. Work pipe several times to 50k with no progress either direction. SD pump and work pipe to 55k w/ no progress either direction. Orientor moves freely, wob does not change Park at 10280' w/ neutral wt and circ 2.4/2.33/3300 while order crude and discuss Continue to circ 2.53/2.46/3400 while stuck w/ bit at 10280', CTC at 10210' while wo crude. Occasionally work in down mode only from 40k w/ no progress. Assume sticking mechanism is the same as prior incident-BHA is stuck due to hole tortuosity Phz 1 LRS AOL @ 0100 hrs. Safety mtg re: pump crude. RU LRS. VP chk @ 1.0 psi PT LRS @ 3000. LRS load CT w/ 15 bbls 7.30# 47.8E dead crude at 1.0/1720. Rig displace w/mud 2.59/2.54/3750 and spot 5 bbls out of bit w/ CT at neg wt Let crude soak 15 min w/ neg wt. Try a few pulls to 55k, then 65k, then 80k w/o movement. Pump 5 more bbls and let it soak for 20 min. Work to 90k w/o success. Pressure wellbore Printed: 12/19/2007 2:44:18 PM • • BP; EXPLORATION Page 17 of 40 Operations Summary Report Legal Well Name: 18-13A Common Well Name: 18-13A Spud Date: 11/3/1987 Event Name: DRILL+COMPLETE Start: 10/27/2007 End: 11/7/2007 Contractor Name: NORDIC CALISTA Rig Release: 12/9/2007 Rig Name: NORDIC 2 Rig Number: Date From - To Hours Task Code NP7 Phase' Description of Operations 11/16/2007 02:20 - 03:30 1.17 DRILL N STUC PROD1 to 500 psi and work to 90k w/ no movement 03:30 - 04:15 0.75 DRILL N STUC PROD1 Circ crude to surface 2.64/2.6/3450 and send 60 bbls crude contaminated mud to tiger tank 04:15 - 05:00 0.75 DRILL N STUC PROD1 PT LRS @ 3000. LRS load CT w/ 20 bbls 7.31# 44.6E dead crude at 1.0/1575. Rig displace w/mud 2.55/2.48/3640 and spot 5 bbls out of bit w/ CT at neg wt 05:00 - 05:40 0.67 DRILL N STUC PROD1 Let crude soak for 30 min then work pipe to max both directions. After about 6 cycles and while pulling to max at 92k, pipe came free. PUH at normal pulling weight of 38.5k to 10200' while start pump to fin displace crude 05:40 - 06:30 0.83 DRILL N STUC PROD1 Slow wiper while circ crude to surface prior to mud swap. Wait on Veco driver crew change. 06:30 - 10:30 4.00 DRILL N STUC PROD1 Displace well to new flo pro w/ 4% 776 and 2% lo-torque. 10:30 - 11:30 I 1.00 DRILL N 11:30 - 12:00 0.50 STWHIP N 12:00 - 13:00 1.00 STWHIP N WAIT PROD1 DPRB PROD1 13:00 - 15:00 I 2.001 STWHIPI N I DPRB PROD1 15:00 - 16:00 1.001 STWHIPI N (DPRB PROD1 16:00 - 16:15 0.25 STWHIP N DPRB PROD1 16:15 - 18:40 I 2.42 STWHIPI N DPRB PROD1 18:40 - 19:55 1.25 STWHIP N DPRB PROD1 19:55 - 22:00 I 2.081 STWHIPI N I DPRB I PROD1 22:00 - 22:15 0.251 STWHIPI N (DPRB PROD1 22:15 - 22:45 0.50 STWHIP N DPRB PROD1 22:45 - 23:05 I 0.331 STWHIPI N I DPRB I PROD1 23:05 - 00:00 I 0.921 STWHIPI N I DPRB I PROD1 11/17/2007 100:00 - 01:00 I 1.001 STWHIPI N I DPRB I PROD1 01:00 - 01:45 01:45 - 02:25 02:25 - 02:55 0.501 STWHIPI N 02:55 - 05:15 2.33 STWHIP N 0.751 STWHIPI N I DPRB I PROD1 0.671 STWHIPI N I DPRB I PROD1 05:45 - 07:30 I 10.751 DR LL IPI N DPRB PROD1 DPRB PROD1 DPRB PROD1 DPRB PROD1 Lift Baker equipment to rig floor. Make up billet and setting tool on Inteq BHA including orienter. Run in hole at 80 fpm with billet assembly. 38k# up, 22k# do wt at 9900'. Log GR tie in from 9125'. Subtract 5' correction. On depth with billet top at 9970'. TF oriented HS. Close EDC. Pressure coil to 3750 psi to set anchor. Circulate out of hole. LD WS setting assy MU sidetracking assy RIH w/ BHA #27 (used STR335 bit w/ 1.7 deg motor) circ thru EDC 0.4/680 Log tie-in down from 9120', Corr -4.5'. Close EDC RIH thru window at min rate. Wiper to billet 2.3/2830 was clean. Tag at min rate at 9970.0' PVT 348 PUH 38k. Start motor 2.41/2940. Slow ream to top of billet at 45L and first MW @ 9969.4' Autodrill 2.42/2.33/2890/45L from 9970.0'. Just stacking wt. PU w/ 5k over (dill). Ease back down and feel-drill to 9971.2' by 0000 hrs Continue sidetrack off of billet at 9970'. Appear to be drilling formation at 9973.0'. Gradually incr penetration rate Drill from 9978' 2.4/2.36/2900/45L w/ <50 psi dill, 1-1.5k wob w/ 9.76 ECD to 9993' and are showing enough angle to call it good Backream and ream at 5'/min from 9993' to 9960' at DTF, 80L and 10L 2.4/2.32/2830 and was clean on all passes Wiper to window, clean POH circ thru EDC 2.8/2800. Blow down 'out' MM three time due to aluminum Inspect last 50' of CT for wear LD sidetrack BHA Change orientor. MU lateral assy. 1.1 deg x-treme mtr with Hycalog DS49 style 3.75" bit. Stab coil. Test tools. Get on well. Circulate out of hole through EDC. Noted a slug of cuttings as BHA got to surface. Hold PJSM to discuss handling BHA. STUC PROD1 Lay down BHA. Inspect and test tools. No problems noted. Printed: 12/19/2007 2:44:18 PM BP EXPLORATION Page 18 of 40 Operations Summary Report Legal Well Name: 18-13A Common Well Name: 18-13A Spud Date: 11/3/1987 Event Name: DRILL+COMPLETE Start: 10/27/2007 End: 11/7/2007 Contractor Name: NORDIC CALISTA Rig Release: 12/9/2007 Rig Name: NORDIC 2 Rig Number: Date From - To I Hours ( Task I Code I NPT I Phase Description of Operations 11/17/2007 107:30 - 09:30 2.00 DRILL N DPRB PROD1 I Run in hole 09:30 - 09:45 0.25 DRILL N DPRB PROD1 09:45 - 10:00 0.25 DRILL N DPRB PROD1 10:00 - 10:30 0.50 DRILL N DPRB PROD1 10:30 - 13:30 3.00 DRILL N DPRB PROD1 13:30 - 14:15 0.75 DRILL N DPRB PROD1 14:15 - 15:15 1.00 DRILL N DPRB PROD1 15:15 - 16:15 1.00 DRILL N DPRB PROD1 16:15 - 17:30 1.25 DRILL N DPRB I PROD1 17:30 - 20:00 2.50 DRILL N DPRB PROD1 20:00 - 20:50 0.83 DRILL N DPRB PROD1 20:50 - 21:00 0.17 DRILL N DPRB PROD1 21:00 - 21:50 0.83 DRILL N DPRB PROD1 21:50 - 23:00 1.17 DRILL N DPRB PROD1 23:00 - 00:00 ( 1.001 DRILL I N I DPRB i PROD1 11/18/2007 100:00 - 01:35 I 1.581 DRILL I N 01:35 - 02:55 I 1.331 DRILL P 02:55 - 05:45 2.83 DRILL P 07:45 - 100:30 I 2.0751 DRILL I P 10:30 - 12:00 i 1.50 i DRILL I P DPRB I PROD1 PROD1 PROD1 PROD1 PROD1 PROD1 Log GR tie in. Subtract 5' correction. Wiper trip in hole to billet. 3330 psi at 2.56 in. Ream forward past billet at 45L. Back ream same up past billet. No mtr work on either pass. Drill ahead from 9990'. 3300 psi fs at 2.60 in/out. 2-3k# wob BHP/ECD/PVT: 4512/10.0 ppg/324 bbls. I NCUAZM/TF: 92.6/125.0/250L ROP: 70-90 FPH. Some stalling. Wiper trip to window. Hole smooth. Drill ahead to 10,230'. Drill ahead from 10,230'. 3325 psi fs at 2.58 in/out. 200-300 psi mtr work. 2-3k# wob I NCL/AZM.TF: 90.4//115/908 ROP: 60-80 FPH. Wiper trip to window. Hole smooth. PVT 321 Drill ahead from 10,292' 2.58/2.53/3400/80L w/ 150-350 psi dill, 2-3k wob w/ 10.17 ECD at 90 deg at 8689' TVD 60-80'/hr. See fault at 10400' Drill to 10450' PVT 316 Wiper to window was clean Log tie-in down from 9220' 0.56/1130, corr +4' Wiper to TD tagged at 10452' was clean PVT 307 Drill from 10452' 2.56/2.50/3400/95L w/ 200-400 psi dill, 1.5-2.5k wob w/ 10.15 ECD a t90 deg at 8689' TVD at 60-80'/hr. Drill to 10523' Drill into possible fault zone at 10523'-acts like rubble. Several stalls and additional 0.1 bpm losses. Several BHA wipers w/ minor OP's. Orientor will not stay locked when reaming rough hole from 10510-535'. Drill to 10535' Continue drilling from 10535' in what acts like a rubble zone, however GR shows nothing abnormal. Break out at 10550' and drill 2.60/2.50/3400/90L w/ 100-300 psi dill, 0.5-2.5k wob w/ 10.22 ECD. Drill to 10598' PVT 285 Phz 1/2 Wiper to window was clean both directions PVT 279 Drill from 10598' 2.60/2.54/3360/85L w/ 100-350 psi dill, 2-4k wob w/ 10.18 ECD at 90 deg at 8688' TVD 50-80'/hr. Swap to right at 10700'. Have a little trouble making hole after TF change. Drill to 10750' Wiper to window. Hole smooth in both directions. Drill ahead from 10,750'. 3400 psi fs at 2.66 in/2.58 out. 250-350 psi mtr work. 2.5-3.5k# wob BHP/ECD/PVT: 4635/10.27/246 bbls I NC/AZM/TF: 89.8/93.6/858 ROP: 70-90 fph Make frequent 100' wiper trips to maintain wt transfer. Long wiper trip to 8000' prior to mud swap. Jog at w+ndow and open EDC. 3480 psi at 3.03 bpm. Printed: 12/19/2007 2:44:18 PM BP EXPLORATION Page 19 of 40 Operations Summary Report Legal Well Name: 18-13A Common Well Name: 18-13A Spud Date: 11/3/1987 Event Name: DRILL+COMPLETE Start: 10/27/2007 End: 11/7/2007 Contractor Name: NORDIC CALISTA Rig Release: 12/9/2007 Rig Name: NORDIC 2 Rig Number: Date: From - To Hours Task Code NPT Phase Description of Operations 11/18/2007 10:30 - 12:00 1.50 DRILL P PROD1 Spot trucks for mud swap. 12:00 - 12:15 0.25 DRILL P PROD1 Log GR tie in from 9125'. Add 8' correction. 12:15 - 13:00 0.75 DRILL P PROD1 Close EDC. Continue wiper trip to btm. 13:00 - 13:30 I 0.501 DRILL I P I I PROD1 13:30 - 16:00 2.50 DRILL N RREP PROD1 16:00 - 17:15 1.25 DRILL P PROD1 17:15 - 18:15 1.00 DRILL P PROD1 18:15 - 19:15 1.00 DRILL P PROD1 20:15 - 210:10 I 0.92 DRILL P I PROD1 21:10 - 23:15 2.08 DRILL P 23:15 - 00:00 0.75 DRILL P PROD1 11/19/2007 00:00 - 01:10 1.17 DRILL P PROD1 01:10 - 03:20 2.17 DRILL N DFAL PROD1 04:30 - 05:05 I 0.581 DRILL I N I DFAL I PROD1 05:05 - 05:15 0.17 DRILL N DFAL PROD1 05:15 - 06:15 1.00 DRILL N DFAL PROD1 06:15 - 08:15 2.00 DRILL N DFAL PROD1 08:15 - 10:30 2.25 DRILL N DFAL PROD1 10:30 - 12:30 2.00 DRILL N DFAL PROD1 12:30 - 14:45 I 2.251 DRILL I N I DFAL I PROD1 15 30 - 16:45 I 10.751 DRILL I N I DFAL I PROD1 3330 psi fs at 2.52 bpm. Drill ahead from 10,864'. 3000 psi fs at 2.53 in/out. 200-350 psi mtr work. 2.5-3.5k# wob Inc/AzmffF: 86.9 deg/109.2 deg/60L. Continue mud swap. Phz 1 Shaker circuit breaker failed. Circulate while pulling up hole. Run in hole. 2800 psi fs at 2.59 in. Drill ahead. PVT 380 Drill from 10970' 2.60/2.56/2840/608 w/ 200-500 psi dill, 2-6k wob w/ 9.88 ECD at 90 deg at 8692' TVD and 60-120'/hr. Swap to left at 11000'. Drill to 11050' PVT 376 Wiper to window was clean Wiper to TD was clean Drill from 11050' 2.65/2.54/2940/85L w/ 200-400 psi dill, 2-4k wob w/ 9.91 ECD at 89.5 deg 8692' TVD in 60 api sand at 60-110'/hr. Drill to 11200' PVT 375 Wiper to window Finish wiper to window from 11200'. Hole was clean both directions PVT 353 Drill from 11200' 2.60/2.50/2980/80L w/ 200-350 psi dill, 2-4k wob w/ 10.02 ECD at 89.5 deg at 8694' TVD in 60 api Z1 sand at 60-90'/hr. Drill to 11350' PVT 340 Wiper to window was clean. Pull thru window, open EDC Jet solids OOH thru EDC 3.10/3000 while short trip over 9200'-8000' Log tie-in down from 9125', corr +4'. Close EDC Wiper to TD was clean PVT 315 Drill ahead from 11,400'. 3100 psi fs at 2.52 in/2.45 out. 100-250 psi mtr work. 2.5-3.5k# wob BHP/ECD/PVT: 4575/10.14 ppg/305 bbls I N C/AZ M/T F: 92.5/88.3/ 110 R ROP up to 100 fph. Frequent short wipers required to keep coil sliding. Wiper trip to window. 3030 psi at 2.51 in. PVT: 286 bbls. Drill ahead from 11,500. 3400 psi fs at 2.75 in/2.47 out. Drill at 90-110 fph to keep coil sliding. Wiper trip to window. 3370 psi at 2.74 in. PVT: 256 bbls. Overpull w/ mtr work at 10086'. Work past. Drill ahead from 11,650'. Circ out of hole. 1.05 bpm at 650 psi. Found hole at +/- 9556'. Stop and inspect coil. Found a +/- 1" gap. Begin spooling back onto reel. Gap increased to +/-75% as pipe came off goose neck. Pipe gap is hung up in v-door Printetl: 12/19/2007 2:44:18 PM BP EXPLORATION Page 20 of 40 Operations Summary. Report Legal Well Name: 18-13A Common Well Name: 18-13A Spud Date: 11/3/1987 Event Name: DRILL+COMPLETE Start: 10/27/2007 End: 11/7/2007 Contractor Name: NORDIC CALISTA Rig Release: 12/9/2007 Rig Name: NORDIC 2 Rig Number: Date From - To Hours Task Code NPT Phase Description of Operations 11/19/2007 15:30 - 16:45 1.75 DRILL N DFAL PROD1 rubber. Stop spooling. 16:45 - 18:00 1.25 DRILL N DFAL PROD1 Stop operation. Discuss options with SLB cell leader. nd u e ui ment to cut ands lice coil. Prepare written plan forward. 18:00 - 20:15 2.25 DRILL N DFAL PROD1 Crew change/safety mtg Circ over the top w/ charge pump PVT 225 Arrange for scaffold crew. Revise plan forward 20:15 - 20:30 0.25 DRILL N DFAL PROD1 Safety mtg re: first step of many ...will secure reel end of pipe first. Plan is to fatigue remaining CT at gap until failure, then pull it back to reel and secure 20:30 - 22:20 1.83 DRILL N DFAL PROD1 Power down BHI tools w/ LS TF and 3606 psi DHP. Disconnect a-line at reel Remove UTIM. Clamp off CT at horsehead. Move CT in hole ~ w/ injector and CT parted leaving reel end on roof as planned. Had plenty of a-line slack, so cut a-line. Install clamp on parted end on roof. Attach blue tugger and get a PT. Pull a bind w/ tugger, remove clamp at horsehead. Pull CT back to reel. Moved levelwind up to keep end of CT off of roof and 1/2" bolt holding the stop on the pogo stick failed which let the pogo stick pull out of the receiver. Put stick back in receiver and chain off, then finish pulling CT to reel and clamp off at horsehead. Remove clamp from the parted end and trim 2' off remaining reel side stub 22:20 - 22:35 0.25 DRILL N DFAL PROD1 Safety mtg re: step two ... secure and dress injector side stub. Plan is to break off lub, strip injector off of CT so CT can be cut about 8' above the rig floor 22:35 - 23:00 0.42 DRILL N DFAL PROD1 SWS mechanic repair pogo stick stop device. Close upper pipe/slips w/ 26k hanging wt. Pull test to 50k and slack off to Ok. RILDS. Break lubricator connection at top of 3' er just below packoff. Strip injector over CT to expose 10' of CT. Set bowl on 3' lubricator section and secondary secure CT w/ handslips and dogcollar. Continue circ over the top of well w/ charge pump w/minimal loss PVT 220 23:00 - 00:00 1.00 DRILL N DFAL PROD1 Safety mtg re: RU work platform Bring scaffolding up beaver slide. Assist scaffold crew in RU. 11/20/2007 00:00 - 01:40 1.67 DRILL N DFAL PROD1 Cut CT approx 9' above rig floor and was dry. Remove -15' of CT from the other parted end by RIH thru chains and packoff to rig floor Set injector in front of scaffolding. Prep internal grapple assy and thread thru injector over pipeshed to reelhouse and install into reel end of CT 01:40 - 01:50 0.17 DRILL N DFAL PROD1 Safety mtg re: pull CT to Floor 01:50 - 02:45 0.92 DRILL N DFAL PROD1 Remove chain from levelwind. Pull test internal grapple. Remove clamp. Pull CT to floor and stab thru injector chains 02:45 - 03:00 0.25 DRILL N DEAL PROD1 Safety mtg re: install and weld spoolable connector 03:00 - 05:00 2.00 DRILL N DFAL PROD1 Remove 3' lubricator. Prep ends of CT for spoolable connector. Stab and weld each end w/ SWS welder RD scaffolding. Strip injector over splice and MU to lubricator. Load out scaffolding PVT 215 Open rams 05:00 - 07:30 2.50 DRILL N DFAL PROD1 Start POH and took 55k (dill) to start moving. POOH 38k thru .open hole and window, clean before POH at normal speeds. Printetl: 12/19/2007 2:44:18 PM BP EXPLORATION Page 21 of 40 Operations Summary Report Legal Well Name: 18-13A Common Well Name: 18-13A Spud Date: 11/3/1987 Event Name: DRILL+COMPLETE Start: 10/27/2007 End: 11/7/2007 Contractor Name: NORDIC CALISTA Rig Release: 12/9/2007 Rig Name: NORDIC 2 Rig Number: Date From - To Hours Task- Code NPT Phase Description of Operations 11/20/2007 05:00 - 07:30 2.50 DRILL N DFAL PROD1 Continue to fill from the BS. Hold PJSM to discuss getting off well and handling BHA while POOH. 07:30 - 08:00 0.50 DRILL N DFAL PROD1 At surface. Get off well. Unstab coil. Blow down Inteq tools and lay down same. 08:00 - 08:30 0.50 BOPSU P PROD1 Function test BOP equipment. 08:30 - 08:45 0.25 DRILL N DFAL PROD1 Circulate coil while waiting on SLB N2 crew. 08:45 - 09:30 0.75 DRILL N DFAL PROD1 Hold PJSM with SLB N2 crew. Spot and rig up N2 unit. Prep coil to pump N2. 09:30 - 10:45 1.25 DRILL N DFAL PROD1 Displace coil to fresh water. 1780 psi at 2.98 bpm. Displace water with N2. 1500 scf/min for 15 min. Take rtns to tiger tank. Bleed of remaining coil pressure through Baker choke. 10:45 - 10:50 0.08 DRILL N DFAL PROD1 Hold PJSM to discuss unstabbing coil and spooling back to reel. 10:50 - 13:20 2.50 DRILL N DFAL PROD1 Pull CT across pipe shed & into reel house. Secure coil with shipping bar & clamp & various chains. 13:20 - 13:35 0.25 DRILL N DFAL PROD1 PJSM for lowering reel to ground. 13:35 - 15:00 1.42 DRILL N DFAL PROD1 Swap old reel for slightly newer reel. 15:00 - 18:00 3.00 DRILL N DFAL PROD1 Install bolts, end plates, J-box & reconfigure inner hardline. Test wire - seems ok. 18:00 - 18:30 0.50 DRILL N DFAL PROD1 Crew change &PJSM. 18:30 - 20:00 1.50 DRILL N DFAL PROD1 Install grapple connector & pull test via winch. Pull coil across pipe shed & into injector. Terminate a-line. 20:00 - 21:35 1.58 DRILL N DFAL PROD1 Reverse in methanol & water. Reverse in slack. Test agitator - good vibrations, MU to motor & scribe to agitator. 21:35 - 22:15 0.67 BOPSU N DFAL PROD1 Pressure test inner reel valve & CT packoffs. 22:15 - 22:20 0.08 DRILL N DFAL PROD1 PJSM regarding cutting pipe w/ cutter. 22:20 - 23:20 1.00 DRILL N DFAL PROD1 Pop off well. Install coil cutter. Cut coil to find wire - 78'. Test wire -seems ok. Set coil cutter on RF. Cut off 5' with hand cutter. Dress end of coil, install SLB CTC & pull test same to 38k - ok. 23:20 - 00:00 0.67 DRILL N DFAL PROD1 Circ thru coil to warm it up. Fill hole with mud - 12bbls. Head up BHI tools. 11/21/2007 00:00 - 00:30 0.50 DRILL N DFAL PROD1 Continue to Head up BHI tools. Circ mud thru coil to warm it up. 00:30 - 01:15 0.75 DRILL N DFAL PROD1 Pressure test to 500psi, bleed off &retighten XO. Pressure test CTC & BOT UPO to 3500psi -bleed off &retighten other XO. Pressure test to 3800 psi -good test. Bleed off. Place injector over bung hole & circulate mud into coil. 01:15 - 02:10 0.92 DRILL N DFAL PROD1 PU motor/agitator & install bit & float sub -torque connections. Verify scribe line & place tools in well. PU BHI tools & MU to motor. Perform kick while trippinf drill -good. PU injector & MU coil to BHA & stab onto well. 02:10 - 04:25 2.25 DRILL N DFAL PROD1 Power up & test tools -good. Set counters & RIH with EDC open, pumping at 2.5bpm @ 2600psi. Blow down Kill line. Review kick drill procedure. Review spill drill procedure. 04:25 - 04:40 0.25 DRILL N DFAL PROD1 Log down for tie-in. 1 motor on shaker has failed. Call for electrician. (corr=2'). Close EDC. 04:40 - 05:00 0.33 DRILL N DFAL PROD1 Wiper to bottom. 2.45bpm @ 3660 psi. 05:00 - 06:00 1.00 DRILL N DFAL PROD1 Slowly PUH while circulating out bottom's up gas. 06:00 - 07:45 1.75 DRILL N RREP PROD1 Park at 9150', SD pump and open EDC. Close in well and replace shaker motor after performing LO/TO procedures. Printed: 12/19/2007 2:44:18 PM ~ ~ BP EXPLORATION Page 22 of 40 Operations Summary Report Legal Well Name: 18-13A Common Well Name: 1 8-13A Spud Date: 11/3/1987 Event Name: DRILL+COMPLETE Start: 10/27/2007 End: 11/7/2007 Contractor Name: NORDIC CALISTA Rig Release: 12/9/2007 Rig Name: NORDIC 2 Rig Number: Date From -To' Hours Task Code NPT Phase Description of Operations 11/21/2007 06:00 - 07:45 1.75 DRILL N RREP PROD1 Move CT uphole every 30 min to avoid freezing Phz 1/2 07:45 - 11:30 3.75 DRILL N RREP PROD1 Electrician needs armored wire, so makes trip to Deadhorse to get same Continue to move CT uphole every 30 min and pump down CT to replace voidage and losses to formation 11:30 - 12:10 0.67 DRILL N DFAL PROD1 Resume circ thru EDC 2.58/2.50/2850. RIH from 8850' to 9125'. CBU while log tie-in down, Corr +2'. Close EDC 12:10 - 12:45 0.58 DRILL N DFAL PROD1 RIH thru window, clean. Wiper to TD w/ set down at 10090' 12:45 - 14:05 1.33 DRILL N DFAL PROD1 Have trouble getting by shale at 10090' and TF change at 10135'. Ream and backream at DTF until clean 2.57/3950 14:05 - 15:15 1.17 DRILL N DFAL PROD1 Continue wiper to TD w/ another set down at 10800'. Finish ', wiper to TD tagged at 11667, right where we left 15:15 - 15:45 I 0.501 DRILL 1 N I DFAL I PROD1 15:45 - 17:35 I 1.831 DRILL 1 N I DFAL I PROD1 17:35 - 19:35 2.00 DRILL N DFAL PROD1 19:35 - 20:00 0.42 DRILL N DFAL PROD1 20:00 - 20:15 0.25 DRILL N DFAL PROD1 20:15 - 20:55 0.67 DRILL N DFAL PROD1 20:55 - 21:15 0.33 DRILL N DFAL PROD1 21:15 - 22:15 1.00 DRILL N DFAL PROD1 22:15 - 22:40 0.42 DRILL N DFAL PROD1 22:40 - 22:55 0.25 DRILL N DFAL PROD1 22:55 - 23:10 I 0.251 DRILL I N I DFAL f PROD1 23:10 - 23:30 I 0.331 DRILL I N I DFAL I PROD1 PUH 29.2k which is 10k less than normal. RIH wts were also low while RIH. Circ 2.40/2.30/3900 while PUH/RIH while check for debris adjust wt cell. No problems found. Adjustment has string wts closer to normal 38k up, 12k down Drill from 11667' 2.40/2.30/3920/908 w/ 200-300 psi dill, 1-2k wob w/ 10.89 ECD at 40'/hr. Have high CTP due to agitator and 2000' of extra CT. Drill to 11750' Wiper to window. Pull above window. Open EDC. PUH to 8000' while pumping, 2.95bpm @ 3500psi. Wiper to window, pumping at 2.95bpm @ 3633psi. Log down for tie-in (-6' corr. Close EDC. Wiper to TD. Having weight issues again, no motor work. Inspect weight cell. Recovering blue rubber now. Reduce pump rate & slowly PUH. PJSM for changing out stripper rubber. Stop moving pipe, close annular & open whitey to bleed off pressure. Open window & C/O striping rubber & extrusion rubber. Weight issues have been cured. Wiper to TD. Slight set down at 10100' -otherwise clean. Swap to new mud. Drill ahead from 11,748' 4150 psi fs at 2.50 in/2.40 out. 200-350 psi mtr work. 2.5-3.5k# wob BHP/ECD/PVT: 4932/10.92 ppg/105 bbls I NC/AZM/TF: 88.5/132/90L DHT/ST: 150/78 Drill to 11776' Getting slight erroneous readings from orientator. PU off bottom 10' to take survey with reduced pump rate. Swap pumps & repair leaking cap seal. Perform same repair on other pump. Go back to drilling....PUH & differentially stuck. Turn pump off & let coil relax. Orientate -free at bit. Got free. Scold driller again for not picking up hole fast enough off bottom. Start pumping while slowly PUH while SLB changes out. Drill ahead from 11,766' 3900 psi fs at 2.50 in/2.35 out. ROP = 60-90fUhr. 200-350 psi mtr work. 2.5-3.5k# wob BHP/ECD/PVT: 4605/10.19 ppg/18 bbls Printed: 12/19/2007 2:44:18 PM BP EXPLORATION Page 23 of 40 Operations Summary Report Legal Well Name: 18-13A Common Well Name: 18-13A Event Name: DRILL+COMPLETE Contractor Name: NORDIC CALISTA Rig Name: NORDIC 2 Date From - To Hours Task Code I NPT 11/21/2007 23:10 - 23:30 0.33 DRILL N 23:30 - 00:00 I 0.501 DRILL I N 11/22/2007 100:00 - 03:15 I 3.251 DRILL I N 03:15 - 05:30 I 2.251 DRILL I N 05:30 - 07:10 1.671 DRILL I N 07:10 - 09:00 1.83 DRILL N 09:00 - 09:10 0.17 DRILL N 09:10 - 10:45 1.58 DRILL N 10:45 - 12:45 I 2.001 DRILL I N 12:45 - 15:45 I 3.00 I DRILL I N 15:45 - 16:40 I 0.921 DRILL I N Start: 10/27/2007 Rig Release: 12/9/2007 Rig Number: Spud Date: 11/3/1987 End: 11 /7/2007 Phase I Description of Operations DEAL IPROD1 DFAL IPROD1 DFAL IPROD1 DFAL I PROD1 DFAL IPRODI DFAL IPROD1 DFAL PROD1 DFAL PROD1 DFAL IPROD1 STUC IPRODI STUC IPROD1 16:40 - 17:45 1.08 DRILL N STUC PROD1 17:45 - 21:00 3.25 DRILL N STUC PROD1 21:00 - 21:35 0.58 DRILL N DFAL PROD1 21:35 - 22:15 0.67 DRILL N SEAL PROD1 22:15 - 22:40 0.42 DRILL N DEAL PROD1 22:40 - 00:00 1.33 DRILL N DEAL PROD1 I NC/AZM/TF: 88.1 /124/60L DHT/ST: 152/73 Drill to 11789' Reboot BHI computers to trouble shoot orienter. No luck. Elect to POH to swap orientor before total loss of orientator. Continue to POH. Opened EDC when BHA inside the casing. MU new BHI BHA on cat walk. Start to bring in liner. PJSM while POH regarding handling BHA. Flow check well at 200ft. Tag up & pop off well. Inspect coil connector. Break BHA off injector & place injector over bung hole. Purge/blow down tools. PU BHA & lay down on catwalk. Break off DPS & MU to new BHI tools on catwalk. LD motor & agitator on RF & rescribe. Fill hole twice - 4bbls. Recovered large shale pieces from coil connector, UOC, & sides of bit. Recovered broken pin from FVS laying on top of agitator. Test BHI tools on catwalk. PU motor & agitator & place in well. PU & MU BHI tools to motor. PU injector & check set screws on CTC & MU coil to BHA. Stab injector onto well. L1/L2 RIH circ thru bit 0.48/860 Log tie-in down from 9125', corr +8' ? RIH thru window, clean. Wiper to TD 2.52/3660 w/ one set down at 10090'. Tag TD at 11806'? PUH and corr depth to 11789'-assume counter slippage before window. RBIH PVT 238 Drill from 11789' 2.62/2.44/4000/85-45LL w/ 400 psi dill, 2-4k wob w/ 10.35 ECD at 90 deg at 8697' TVD. Got a little low on TVD, then got 20 DLS while correcting. Drill to 11897' Stuck CT while PU to survey from 11897'. Drug uphole about 15' before stopping. Neutral wt puts bit at 11876'. Circ. Can move orientor. Work several times to 85k, then SD pump for 30 min. Work to 90k w/o success. Repeat. CBU w/ stacked wt. Work to 90k w/o success MIRU LRS pumper and dead crude transport VP 0.5 psi Safety mtg re: pump crude PT LRS @ 4000. LRS load CT 1.13/1.0/1950 w/ 20 bbls 7.23# 73.0E dead crude. Rlg displace w/mud 2.42/2.29/4180. SD pump w/ 5 bbls out of the bit Let crude soak 30 min then work pipe w/o success. Pump 5 more bbls and let soak. Pult free on second attemot. PUH 34k while start pump 2.5/4090 and fin displace crude. RDMO LRS Wiper to window. Divert returns to tiger tank - 60bbls. Open EDC above window. Pump @ 2.90bpm/3260psi. PUH to 8000'. Log down for tie-in (+39' corr). Change out SLB counter. Close EDC & log RA marker. (0' corr). Wiper to bottom.. Slight set down at 10090', bobble through it - otherwise clean. Perform check shot survey's from 11774', 11804',11837',11869',11895' while simultaneously reaming section to bottom. Survey's have changed slightly giving less of a DLS. Hydraulic reading =weight cell reading while PUH, 30k @ 11900'. Printed: 12/19/2007 2:44:18 PM ~ ~ BP EXPLORATION Page 24 of 40 Operations Summary Report Legal Well Name: 18-13A Common Well Name: 18-13A Spud Date: 11/3/1987 Event Name: DRILL+COMPLETE Start: 10/27/2007 End: 11/7/2007 Contractor Name: NORDIC CALISTA Rig Release: 12/9/2007 Rig Name: NORDIC 2 Rig Number: Date From - To Haurs Task Code NPT Phase Description of Operations 11/23/2007 00:00 - 01:05 1.08 DRILL N DFAL PROD1 Drill ahead from 11,911' 4000 psi fs at 2.40 in/2.25 out. 200-400 psi mtr work. 2.5-4.5k# wob ROP = 10-90fph BHP/ECD/PVT: 4754/10.52 ppg/135 bbls I NC/AZM/TF: 92/99/80L DHT/ST: 152/90 Drill to 11964' 01:05 - 01:20 0.25 DRILL N DFAL PROD1 PU & BHA wiper trip prior to survey. Very ratty at 11911'-11918', however no motor work through section (possible fault?). 01:20 - 01:45 0.42 DRILL N DFAL PROD1 Drill ahead from 11,964' 4200 psi fs at 2.36 in/2.22 out. 200-400 psi mtr work. 1.5-2.5k# wob ROP = 80-90fph BHP/ECD/PVT: 4775/10.57 ppg/120 bbls 1 NC/AZM/TF: 94.5/95.6/105L DHT/ST: 150/92 Swap to right at 11976'. Drill to 12,000' 01:45 - 03:45 2.00 DRILL N DFAL PROD1 Wiper to window. Pulled heavy at 11911' -otherwise clean. Take on 150bb1s of flo-pro into pits. 03:45 - 04:55 1.17 DRILL N DFAL PROD1 Wiper to bottom -clean. 04:55 - 05:30 0.58 DRILL N DFAL PROD1 Drill ahead from 12,000' 4100 psi fs at 2.25 in/2.22 out. 200-400 psi mtr work. 1.5-2.5k# wob ROP = 80-90fph BHP/ECD/PVT: 4789/10.60 ppg/195 bb-s I NC/AZMlTF: 94.27/93.49/105L DHT/ST: 152/87 Drill to 12022' 05:30 - 05:35 0.08 DRILL N DFAL PROD1 PU & BHA wiper trip prior to survey. 05:35 - 06:20 0.75 DRILL N DFAL PROD1 Drill ahead from 12,022' 4000 psi fs at 2.25 in/2.09 out. 200-400 psi mtr work. 1.5-3.5k# wob ROP = 40-70fph BHP/ECD/PVT: 4834/10.71 ppg/189 bbls I NC/AZM/TF: 93.81 /88.37/120R DHT/ST: 150/88 Drill to 12062' Phz 1/2 GPB, Phz 3 Kup 06:20 - 06:50 0.50 DRILL N DFAL PROD1 Perform more check shot surveys over the last 100' and Azm varies by 6-15 deg. Have to keep BHA moving >4'/min or is dill sticking (both directions) 31.4k, 9k 06:50 - 08:50 2.00 DRILL N DFAL PROD1 Wiper to window while perform check shot surveys at various spots. A few minor overpulls. Up wt at 10100'=30.5k, 9300'=28.1 k Phz 2/2 GPB 08:50 - 09:00 0.17 DRILL N DFAL PROD1 Log tie-in down from 9230' 0.50/0.42/1780, Corr +6' 09:00 - 09:30 0.50 DRILL N DFAL PROD1 Wiper in hole to good survey spots at 9540' and 9482'. Surveys match. Wiper back to window. POOH thru window, open EDC 09:30 - 10:40 1.17 DRILL N DFAL PROD1 POOH due to worsening weather and to change DGS. Circ thru EDC 3.1/3720 10:40 - 10:55 0.25 DRILL N DFAL PROD1 Park at 4400' to swap generators Printed: 12/19!2007 2:44:18 PM ~ '~ - BP EXPLORATION Page 25 of 40 Operations Siummary Report Legal Well Name: 18-13A Common Well Name: 18-13A Spud Date: 11/3/1987 Event Name: DRILL+COMPLETE Start: 10/27/2007 End: 11/7/2007 Contractor Name: NORDIC CALISTA Rig Release: 12/9/2007 Rig Name: NORDIC 2 Rig Number: Date Frorn - To Hours Task Code NPT Phase Description of Qperations 11/23/2007 10:55 - 11:45 0.83 DRILL N DFAL PROD1 Finish POOH 11:45 - 12:30 0.75 DRILL N DFAL PROD1 LD drilling BHA. Bit was 1-1-BU. Motor okay 12:30 - 17:30 5.00 BOPSU N DFAL PROD1 Fill hole prior to ROPE test. Perform biweekly BOPE test early due to weather conditions AOGCC waived the States right to witness the test 17:30 - 19:10 1.67 DRILL N DFAL PROD1 Fill hole w/ 14 bbls. Set injector to side. MU drilling BHA w/ fresh DGS 19:10 - 21:15 2.08 DRILL N DFAL PROD1 Set counters. Power up & test tool - ok. Open EDC &RIH. Slight gas while RIH at 460'. Hold back pressure while RIH to window. 21:15 - 22:55 1.67 DRILL N DFAL PROD1 Circulate 2 bottom's up. 22:55 - 23:25 0.50 DRILL N DFAL PROD1 Close EDC. Log for tie-in (-aft corr. Pressure up IA to 75 psi with test pump for integrity conformation. 23:25 - 00:00 0.58 DRILL N DFAL PROD1 Wiper to TD. Take check shot survey's. Slight set down 10100'. Weight up mud system to 9.2ppg. 11/24/2007 00:00 - 01:20 1.33 DRILL N DFAL PROD1 Continue to wiper to bottom & continue to take check shot survey's. 11100' & 125 bbls taking slight gas but very minor. Slight set down at 12022'. 01:20 - 01:45 0.42 DRILL N DFAL PROD1 Tag bottom at 12063'. Slowly PUH while analyzing survey data. Slight discrepancy with survey's, however last survey had the most azimuth variance. Continue to PUH & formulate a plan prior to drilling ahead. 01:45 - 02:05 0.33 DRILL N DFAL PROD1 Drill ahead from 12,063' 4040 psi fs at 2.2 in/1.91 out. 200-400 psi mtr work. 1.5-3.5k# wob ROP = 20-50fph BHP/ECD/PVT: 4878/10.81 ppg/372 bbls I NC/AZM/TF: 93.81 /88.37/1008 DHT/ST: 152/83 02:05 - 02:15 0.17 DRILL N DFAL PROD1 02:15 - 02:50 0.58 DRILL N DFAL PROD1 02:50 - 03:10 0.331 DRILL I N DFAL PROD1 03:10 - 03:45 0.58 DRILL N DFAL PROD1 03:45 - 03:55 0.17 DRILL N 03:55 - 05:30 1.58 DRILL N 05:30 - 06:00 0.50 DRILL N 06:00 - 09:20 3.33 DRILL N DFAL PROD1 DFAL PROD1 DFAL PROD1 DFAL IPROD1 PU & BHA wiper trip prior to survey. Clean PU. Drill ahead from 12,084' 4040 psi fs at 2.2 in/2.00 out. 200-400 psi mtr work. 1.5-3.5k# wob ROP = 20-50fph BHP/ECD/PVT: 4711/10.44 ppg/361 bbls I NC/AZM/TF: 88.10/95.33/708 DHT/ST: 152/84 Drill to 12115' PU & BHA wiper trip prior to survey. Clean PU. Drill ahead from 12,115' 4200 psi fs at 2.2 in/2.00 out. 200-400 psi mtr work. 1.5-3.5k# wob ROP = 20-50fph BHP/ECD/PVT: 4889/10.83 ppg/357 bbls I NC/AZM/TF: 86.59/99.49/808 DHT/ST: 152/84 Drill to 12152' PU 8~ BHA wiper trip prior to survey. Clean PU. Wiper to window -clean. Wiper to TD. Set down at 10100'. Phz 1/L2 Work to get by 10090-10135' 1.53/1.4/3400 w/ 11.03 ECD w/ Printed: 12/19/2007 2:44:18 PM BP EXPLORATION Page 26 of 40 Opera#ians Slummary Report Legal Well Name: 18-13A Common Well Name: 18-13A Spud Date: 11/3/1987 Event Name: DRILL+COMPLETE Start: 10/27/2007 End: 11/7/2007 Contractor Name: NORDIC CALISTA Rig Release: 12/9/2007 Rig Name: NORDIC 2 Rig Number: Date From - To Hours Task Code NPT Phase Description of Operations 11/24/2007 06:00 - 09:20 3.33 DRILL N DFAL PROD1 9.2 ppg mud The TF change at 10135' from 90L to 70R which is at the bottom of the shale complicates reaming and cleaning up the hole. Also, the BHI orientor stops are aligned so that the TF has to be rolled LS rather than HS which was how the hole was drilled initially and reamed in the past. Clean out to 10135' at 90L then roll TF LS to 70R while RIH at 1'/min. Cleaned out to 10141', but stacking 5k and now have differential ... May have sidetracked 09:20 - 09:35 0.25 DRILL N DEAL PROD1 Slow backream 1.62/3570 from 10141' to 10080' at DTF and was finally clean 09:35 - 10:30 0.92 DRILL N DPRB PROD1 Ream in hole 10'/min 1.62/3500 and was clean to 10141' set down. Spud, ream, move orientor around to HS and unable to find old hole. Ream down from 10120' around the clock and have no success. Discuss Shale has been open too long. Will start over by setting another billet at +/-9820' 10:30 - 11:30 1.00 DRILL N DPRB PROD1 Slow wiper to window at max pump rate of 2.0/4300 w/ 4825 psi dhp=11.07 ECD Park at 9190' and open EDC 11:30 - 13:30 2.00 DRILL N DPRB PROD1 POOH circ thru EDC 2.60/3800 PVT 224 13:30 - 14:15 0.75 DRILL N DPRB PROD1 LD drilling BHA Bit was 1-1-BU 14:15 - 17:00 2.75 DRILL N DPRB PROD1 Will cut CT while wo BTT to prep billet Need to move wear spot from 10100' plus reduce friction pressure from extra CT (reel is 16,800' plus has 400k RF) Reverse slack back w/mud 3.0/3350 then rev in 15 bbls FW (slack didn't move from downhole end) PVT 270 Install Hite cap. Keep hole fill pump on while cut off 1000' of CT and a-line. Lost 5 bbls 17:00 - 18:00 1.00 DRILL N DPRB PROD1 Reverse slack back again w/ mud. Cut off 34' of CT before finding a-line. Fill hole - 1 bbl. 18:00 - 19:00 1.00 DRILL N DPRB PROD1 Dress end of coil. Install SLB CTC. Pull test to 40k -good. Fill hole - 1 bbl. 19:00 - 21:20 2.33 DRILL N DPRB PROD1 Head up BHI UOC. Meg wire -failed, clean items - 4 attempts, finally good test. 21:20 - 21:30 0.17 DRILL N DPRB PROD1 P.T. coil/CTC to 3800 psi -good. 21:30 - 21:35 0.08 DRILL N DPRB PROD1 PJSM regarding handling OH WS. 21:35 - 23:20 1.75 DRILL N DPRB PROD1 LD & scribe OH WS on catwalk. MU OH WS to BHI tools. PU & stab injector onto tools. Upper quick connect won't make up all the way to BHA. Unstab injector. Fill hole. Replace upper quick connect. MU injector to BHA. Stab onto well. Power up & test tools. 23:20 - 00:00 0.67 DRILL N DPRB PROD1 Set counters & open EDC. RIH. 11/25/2007 00:00 - 01:20 1.33 DRILL N DPRB PROD1 Continue to RIH w/ o en hole whi stock. 01:20 - 01:35 0.25 DRILL N DPRB PROD1 Log for tie-in (-2ft corr. Close EDC. 01:35 - 02:25 0.83 DRILL N DPRB PROD1 RIH to setting depth. 18k RIW. WT ck = 36k up. RIH to 9830ft & PU to neutral wt. Pressure up coil to 4000 psi to set whipstock -good set. Top of open hole whi stock is at 98 9', 5 degrees LOHS. 02:25 - 04:45 2.33 DRILL N DPRB PROD1 POH pumping across the top. PJSM while POH regarding BHA handling. 04:45 - 06:00 1.25 DRILL N DPRB PROD1 Flow check well. Pop off well. Place injector over bung hole. Purge BHA & LD BHA on catwalk to change out internal Printed: 12/19/2007 2:44:18 PM BP EXPLORATION Page 27 of 40 fJperations Summary :Report Legal Well Name: 18-13A Common Well Name: 18-13A Event Name: DRILL+COMPLETE Contractor Name: NORDIC CALISTA Rig Name: NORDIC 2 Date from -To Hours Task..Code NPT 11/25/2007 04:45 - 06:00 1.25 DRILL N DPRB 06:00 - 06:45 0.75 DRILL N DPRB 06:45 - 08:10 1.42 DRILL N SFAL 08:10 - 09:35 1.42 DRILL N DPRB 09:35 - 09:50 0.25 DRILL N DPRB 09:50 - 10:20 0.50 DRILL N DPRB 10:20 - 10:30 0.17 DRILL N DPRB 10:30 - 12:00 1.50 DRILL N DPRB 12:00 - 15:15 3.25 DRILL N DPRB 15:15 - 15:40 0.42 DRILL N DPRB 15:40 - 17:40 2.00 DRILL N DPRB 17:40 - 22:40 5.00 DRILL N DFAL 22:40 - 22:55 0.25 DRILL N DPRB 22:55 - 23:20 0.42 DRILL N DPRB 23:20 - 00:00 0.67 DRILL N DPRB 11/26/2007 00:00 - 01:25 1.42 DRILL N DPRB 01:25 - 01:35 0.17 DRILL N DPRB 01:35 - 02:35 1.00 DRILL N DFAL 02:35 - 03:20 0.75 DRILL N DPRB 03:20 - 05:30 2.17 DRILL N DPRB Spud Date: 11/3/1987 Start: 10/27/2007 End: 11/7/2007 Rig Release: 12/9/2007 Rig Number: Phase Description of Operations PROD1 o-rings. LD BOT setting tool. Fill hole - 2 bbls. PU 1.7 AKO motor &STR335 PDC bit. PU BHI tools & MU to motor. PU injector & stab onto tools. Power up & check tools. PROD1 RIH w/ BHA #33 circ thru EDC 0.8/1480 PROD1 Park at 2150' while BHI does a complete reboot and reset of their PC's PROD1 Resume RIH PROD1 Log tie-in down from 9125', corr -4'. Close EDC PROD1 Wiper to billet 2.5/3720. Tag at min rate at 9820'. PUH 32k, start motor PROD1 RIH 2.48/2.31/3600/45L 18.8k and first MW @ 9819.5'. GR tool quit PROD1 Start KO from 9819.5' w/ 2.49/2.35/3600/45L w/ <50 psi dill, <1 k wob w/ 10.91 ECD at 73 deg 17.1 k. Time drill 0.1'/5 min and went too fast and stall at 9819.7' and have 4k overpull. Ease in hole and find first MW @ 9819.1' Time drill 0.05'/5 min until 9820.3' PROD1 At 9820.3', drilloffs quit so put 2-3k and 200-300 psi dill on bit and still won't drill off like it should. Can't stall motor. Have high vibration on BHI tool. Pickup numerous times and slow ream down. Feels like bit is balled up w/aluminum and won't drill off billet, or motor problem. Drill to 9820.8' PROD1 Wiper to window was clean PROD1 POOH to check BHA while circ thru EDC 2.8/3300. PROD1 Flow check & pop off well. Blow down/purge BHA. LD BHA on catwalk. Place injector over bung hole 7 circ @ min rate. Motor was tight but in ok condition -can still feel lobe action, no visible hang up's that would prevent drilling. Bit was 1-1. HOT has slight problem (can wiggle orientaor housing by hand) but still operational. DGS failure, transfer tools from Nordic 1. No visible explanation for vibration. MU new mud motor with 2.0 AKO setting. Fill hole every hour - 1 bbl per hour. MU new tool string with new DGS -HOT moves very slow. Swap out HOT - 4 times the speed. A possible explanation would be incorrect TF if tourged up & not able to react fast enough. PROD1 PJSM prior to handling BHA. PROD1 MU used STR335 bit to new 2.0 AKO mud motor. PU BHI tools & MU to motor. Verify scribe on motor. PU injector & MU to BHA. Stab injector onto well. PROD1 Power up tools. Set counters. RIH. PROD1 Continue to RIH. Circ thru EDC 0.8/1480. PROD1 Log for tie-in (-5ft corr). PROD1 Diagnose BHI tools. During testing on the catwalk an error occurred during calibration that could implicate the TF value. PUH & make a series of phone calls to BHI's management to increase my confidence level in BHI's ability to properly drill ahead without risk of drilling in the wrong direction. PROD1 RIH. Close EDC at window. Wiper to billet. 2.3/3300. WT ck @ 9815' = 30k up, 14.5k RIW. PROD1 Tag billet at 9820.2' & PU. Time drill billet from 9820.1' 45LOHS @ 2'/hr, 2.3bpm/3300psi ECD=10.89, 17k surface WT, 1-2k DHWOB. PU & tag billet at 9820.3'. PU & resume time drilling. Won't drill just stacking. PU & try at different Printed: 12/19/2007 2:44:18 PM BP EXPLORATION Page 28 of 40 Opelrations Sumlmary Rti:port Legal Well Name: 18-13A Common Well Name. 18-13A Spud Date. 11/3/1987 Event Name: DRILL+COMPLETE Start: 10/27/2007 End: 11/7/2007 Contractor Name: NORDIC CALISTA Rig Release: 12/9/2007 Rig Name: NORDIC 2 Rig Number: Date From - To Hours Task Code NPT Phase° Description of Operations 11/26/2007 03:20 - 05:30 2.17 DRILL N DPRB PROD1 speeds -won't drill. PU & try a different TF, 60L & 30L. Setting 05:30 - 06:30 06:30 - 08:15 down at 9821.3', park at 9821.6' & set the brake. 1.00 DRILL N DPRB PROD1 Park brake at 9821.6' with 5.5k down. Appears to be drilling off very slowly, but after one hr had drilled off by only 500#. Vibration is very low compared to prior assy 1.75 DRILL N DPRB PROD1 Pick up and check parameters @ 28.9k, 17.6k, 2.30/2.20/3270 Adjust TF to 90L. RIH and first MW @ 9820.3' Attempt to drill w/ 150 psi MW @ 1.86k at 90L for 30 min. Move TF to 120E for 30 min and up to 30L for 30 min and make no progress. Intentionally stack more wt up to 4.Ok and see slight increase in differential to 300 psi. Most likely cause of no progress is that the billet is spinning on the anchor assv . BTT does not have anymore anchor assy's on the Slope 08:15 - 08:35 I 0.33 DRILL N 08:35 - 10:40 2.08 DRILL N 10:40 - 11:30 0.83 DRILL N 11:30 - 11:45 I 0.251 DRILL N 11:45 - 13:00 1.25 DRILL N 13:00 - 13:30 0.50 DRILL N 13:30 - 15:50 2.33 DRILL N 15:50 - 16:30 0.67 CEMT N 16:30 - 22:30 6.00 CEMT N 22:30 - 00:00 11/27/2007 100:00 - 02:35 02:35 - 02:50 02:50 - 03:30 03:30 - 03:35 03:35 - 03:55 1.50 CEMT N 2.58 CEMT N 0.25 CEMT N 0.67 CEMT N 0.08 CEMT N 0.33 CEMT N 03:55 - 04:45 I 0.831 CEMT I N 04:45 - 05:20 I 0.58 CEMT N 05:20 - 05:30 0.17 STKOH N DPRB PROD1 Wiper to window was clean DPRB PROD1 POOH circ thru EDC 2.70/3200 DPRB PROD1 LD drilling BHA. Bit 1-1-I w/ no aluminum or scars, motor tite, no marks or abnormalities on any tools Install nitecap DPRB PROD1 Circ CT over bung hole while fill hole thru kill line each 1/2 hr Safety mtg re: the plan forward DPRB PROD1 WOO. Will probably cement ... (sidetrack or PxA) Order cement DPRB PROD1 MU nozzle BHA DPRB PROD1 RIH w/ BHA #35 circ thru nozzle 0.87/1650 to 9300', clean thru window. POOH to 9150' and was clean thru window. RIH thru open hole 17k and had minor wt loss at 9736' and tagged billet at 9826.3' CTD. Corr to 9820' ELMD. PUH 30.9k DPRB PROD1 Park at 9780' and circ 0.87/0.78/1800 while WOO/cement Cementers loading cement at 1600 hrs DPRB PROD1 Receive orders to pump cement to sidetrack 9550-9580'. Cir at 0.5bpm while slowly reciprocating coil. 0.54bpm in/0.47bpm out @ 1630 psi. 1bpm in/0.92 bpm out @ 1963 psi. RIW = 16k 2 9785'. WT ck @ 9784' = 31 k. DPRB PROD1 SLB cement test was bad, only 2hrs thickening time. Retest cement with more retarder. DPRB PROD1 Continue to wait for cement test results. DPRB PROD1 PJSM regarding cement pumping. DPRB PROD1 Prime up cement truck. Flood cement lines & pump 2 bbls of fresh water to wane lines. P.T. to 3800psi -good test. DPRB PROD1 Batch up tub of 17.Oppg class 'G' cement. Take samples of mix water, bulk cement & tub cement. DPRB PROD1 Cement in tub is up to weight, thickening time is 3hr 49 min. Start pumping 17.0 ppg class 'G' cement down the coil & batch mix on the fly for the remainder, pumping at 1.Obpm/2000psi. Pumped 10.1 bbls of cement. S/D & clean out cement lines. DPRB PROD1 Displace cement with flo-pro using rig pump, pumping at 2.Obpm/3500psi. Slow rate down to 0.5bpm/775psi @ 57bb1 away. Momentarilly park at 9820'. Let 0.5bbls of cement come above BHA & lay in 1 for 1, 0.5bpm/830 psi, PUH @ 30'/min to 9200'. Cement is out of nozzle at 9265'. PUH to 9100'. DPRB PROD1 Slowlv PUH & circulate at 0.5bpm/1626psi. can up surface line filter in reel house. DPRB PROD1 RIH from 9030' 2.5/3410 at 30'/min w/ 1/1. See TOC @ 9350', Printetl: 12/19/2007 2:44:18 PM BP EXPLORATION Page 29 of 40 Operations Summary Report Legal Well Name: 18-13A Common Well Name: 18-13A Spud Date: 11/3/1987 Event Name: DRILL+COMPLETE Start: 10/27/2007 End: 11/7/2007 Contractor Name: NORDIC CALISTA Rig Release: 12/9/2007 Rig Name: NORDIC 2 Rig Number: Date: From - To Hours Task Code NPT Phase I Description of Operations 11/27/2007 05:20 - 05:30 0.17 STKOH N DPRB PROD1 05:30 - 08:15 2.75 STKOH N DPRB PROD1 08:15 - 09:00 0.75 STKOH N DPRB PROD1 09:00 - 09:30 0.50 STKOH N DPRB PROD1 09:30 - 09:45 I 0.25 STKOH N DPRB I PROD1 09:45 - 12:30 2.75 STKOH N DPRB PROD1 12:30 - 14:30 I 2.00 I STKOH I N I DPRB I PROD1 14:30 - 14:45 I 0.251 STKOH I N I DPRB I PROD1 14:45 - 14:55 0.17 STKOH N DPRB PROD1 14:55 - 16:00 1.08 STKOH N DPRB PROD1 16:00 - 18:30 I 2.501 STKOH I N I DPRB I PROD1 18:30 - 18:45 0.25 STKOH N DPRB PROD1 18:45 - 21:50 3.08 STKOH N DPRB PROD1 21:50 - 00:00 I 2.171 STKOH I N I DPRB I PROD1 111/28/2007 100:00 - 04:30 I 4.501 STKOH I N I DPRB I PROD1 04:30 - 07:15 I 2.751 STKOH I N I DPRB I PROD1 07:15 - 08:00 I 0.751 STKOH I N (DPRB I PROD1 08:00 - 08:25 I 0.421 STKOH I N I DPRB I PROD1 red rate to 2.0 bpm. RIH to 9550' 2.0/2970 POH chasing cement to surface. Wash jewelry. Dump 50 bbls of mud contaminate w cement Swap CT to water and jet stack w/ swizzle stick Remove UOC and prep end of wire. Stab back on. Reverse slack back w/ water 4.0/3600 Safety mtg re: cut CT RU cutter and cut 1500' of CT and wire. Initially cut 24ft of coil to find wire. Assume 3.41 % slack (482ft) in reel had something to minor movement of wire. RD cutter. Dress end of coil. Install SLB CTC & pull test to 38k. Compressive strength of cement is 3300psi at 13:30. Install BHI anchor assembly. Fill hole every hour - 1 bbl to fill up. Pressure test coil to 3800 psi -good test. Change out packoffs. Fill coil w/ flo-pro. PJSM regarding handling of drilling BHA. MU M09 PDC bit & 2.0 AKO motor. MU BHI tools to motor. PU injector & MU to BHA. Stab on to well. Set counters. Power up & test tools. RIH &circ thru EDC @ 0.5 bpm. Tied in at 9,125 ft, Corrected -4 ft. RIH past WS RIH and PU at 9560 ft , no cement, RIH to 9570 ft no cement. Circulated bottoms up without any pH change. Tumed entire well over to 8.6 ppg new Flo-Pro. RIH to 9,595 ft and seen a couple of spot that took some weight but fell off. RIH and seen stall at 9596 ft, PUH orient TF around due to stops. RIH and stopped at 9,616 ft. PUH, Cirulated bottoms up, pH at 9, Worked way to 9,655 ft (shale section) with drilled tool face. Tagged twice (hard) with WOB and motor work at 9,658ft. PUH and circulated to confirm bottom sample. Sample is 95% Cement (pH 10.5+). Orient TF to 60R and started ST at 9,660 ft Qp = 2.61 / 2.58 bpm Off 2700 psi Vp = 310 bbl Density = 8.8 ppg DHWOB = 0.5 to 4.0 kibf Controlled ROP at 15-20 fph with 55-60 R TF There was times that we had to set the brake and allow the DHWOB drill off. Open hole sidetrack starting at 9,660 ft. Had to work to get it to drill and finally at 9,685 , t e ecame constant at 30 to 40 fph with a 60R TF Drilled to 9,690 ft and circulated bottoms up to check formation percentages. Formation at 15% and the rest was cement. Drill another 5 ft and sample at 9,690 ft was sand. POOH to PU 1.3 deg BHA for lateral section. PJSM while POH. MU new BHI BHA on catwalk & test same (high hours). Tag up, Flow check well. Pop off well. Place injector over bung hole &circ @ min rate. Purge & blow down BHA. LD BHA on catwalk. LD motor on RF & dial down from 2 deg to 1.3 deg. Inspect SLB CTC & tighten grub screws. Fill hole as needed, however losses are minimal. PU 1.3 AKO motor & MU HYC DS49 3.75" PDC bit, place in hole. PU BHI BHA & MU to motor. Scribe to orientor. PU injector & MU to BHA. Stab onto well. Printed: 12/19/2007 2:44:18 PM BP EXPLORATION Page 30 of 40 Operations Summary Report Legal Well Name: 18-13A Common Well Name: 18-13A Spud Date: 11/3/1987 Event Name: DRILL+COMPLETE Start: 10/27/2007 End: 11/7/2007 Contractor Name: NORDIC CALISTA Rig Release: 12/9/2007 Rig Name: NORDIC 2 Rig Number: Date From - To Hours Task Code NPT Phase Description of Operations 11/28/2007 08:25 - 10:30 2.08 DRILL N DPRB PROD1 Set counters. Power up & check tools. RIH. 10:30 - 10:40 0.17 DRILL N DPRB PROD1 Log for tie-in (-5' tort). 4 bbl loss while RIH. 10:40 - 11:10 0.50 DRILL N DPRB PROD1 DHWOB failed while RIH. Continue to RIH to TD. Circ at 2.53bpm/2825psi. 11:10 - 12:20 1.17 DRILL N DPRB PROD1 Drill build section from 9,693' 2970 psi fs at 2.65 in/2.62 out. 200-400 psi mtr work. -1-3k# surface wob, ROP = 50-90fph BHP/ECD/PVT: 4450/9.96 ppg/444 bbls I NC/AZM/TF: 52/120.4/HS-15R DHT/ST: 120/83 Drill to 9778' 12:20 - 12:30 0.17 DRILL N DPRB PROD1 BHA wiper -clean PU, 31 k up wt. 15k RIW. 12:30 - 12:40 0.17 DRILL N DPRB PROD1 Drill build section from 9,778' 2900 psi fs at 2.65 in/2.62 out. 200-400 psi mtr work. -1-3k# surface wob, ROP = 50-90fph BHP/ECD/PVT: 4495/10.04 ppg/436 bbls I NC/AZM/TF: 62/129.5/H S-15R DHT/ST: 118/83 Drill to 9789' 12:40 - 12:45 0.08 DRILL N DPRB PROD1 BHI tools shut off. Stop drilling & PU. Start up centrifuges. 12:45 - 13:30 0.75 DRILL N DPRB PROD1 Drill build section from 9,789' 2875 psi fs at 2.65 in/2.62 out. 200-400 psi mtr work. -1-3k# surface wob, ROP = 50-90fph BHP/ECD/PVT: 4498/10.03 ppg/435 bbls I NC/AZM/TF: 62/129.5/60L DHT/ST: 118/83 Drill to 9841' 13:30 - 14:15 0.75 DRILL N DPRB PROD1 Wiper -slightly sticky off bottom, otherwise clean. wiper to TD was clean. 14:15 - 15:30 1.25 DRILL N DPRB PROD1 Drill build section from 9,789' 2870 psi fs at 2.65 in/2.62 out. 200-400 psi mtr work. ~1-3k# surface wob, ROP = 50-90fph BHP/ECD/PVT: 4500/10.00 ppg/450 bbls I NC/AZM/TF: 71 /130.7/80L DHT/ST: 118/85 Drill to 9910' 15:30 - 18:18 2.80 DRILL N DPRB PROD1 Build section is tom lete. POH for lateral BHA. 18:18 - 18:30 0.20 DRILL N DPRB PROD1 PJSM on handling BHA. Work with Daves Day Cares group on hazards and midigitation of same 18:30 - 20:00 1.50 DRILL N DPRB PROD1 Changed out BHA. Set AKO setting to 1.1 deg 20:00 - 22:15 2.25 DRILL N DPRB PROD1 RIH, open EDC at 200 ft, Op = 2.3 bpm, RIH 22:15 - 22:30 0.25 DRILL N DPRB PROD1 Log tie in at 9125 ft, corrected -7 ft 22:30 - 23:15 0.75 DRILL N DPRB PROD1 SD pump, closed EDC and orient TF to 180 deg. RIH to 9650 ft and orient TF to 60R and RIH 23:15 - 00:00 0.75 DRILL N DPRB PROD1 Tagged bottom at 9909 ft. Orient TF to 110E Drilling lateral section Op=2.52/2.50 bpm CTP = 2700 / 2950 psi BHP = 4481 psi at 10 ppg EDC Printed: 12/19/2007 2:44:18 PM BP EXPLORATION Page 31 of 40 Operations Suummary Report Legal Well Name: 18-13A Common Well Name: 18-13A Spud Date: 11/3/1987 Event Name: DRILL+COMPLETE Start: 10/27/2007 End: 11/7/2007 Contractor Name: NORDIC CALISTA Rig Release: 12/9/2007 Rig Name: NORDIC 2 Rig Number: Date -From -7o Hours Task Code NPT Phase Description of Operations 11/29/2007 00:00 - 01:10 1.17 DRILL N DPRB PROD1 Drillino lateral section at 110-130 deg L TF from 9960 ft to Op = 2.52 / 2.50 bpm CTP = 2700 / 2950 psid WOB /ROP = 5k / 80 fph Vp = 447 bbl 01:10 - 01:50 0.67 DRILL N DPRB PROD1 Wiper trip to base of whipstock 01:50 - 02:55 1.08 DRILL N DPRB PROD1 Drilling lateral section at 110-130 deg L TF from 10.009 ft to 10,100 ft Op = 2.52 / 2.50 bpm CTP = 2700 / 2850 psi WOB /ROP = 1-4k / 60-90 fph Vp = 418 bbl Turned TF from 90L to 90 R at 10080 ft 02:55 - 04:20 1.42 DRILL N DPRB PROD1 Wiper trip from 10,100 ft to 9,220 ft 04:20 - 07:30 3.17 DRILL N DPRB PROD1 Drilling lateral section at 90-130 deg RTF from 10,100 ft Op=2.52/2.50 bpm CTP = 2700 / 2850 psi WOB / ROP = 1-4k / 60-90 fph. ROP is slowing down, i.e. shale at 10,100 ft Vp = 416 bbl Drill to 10,250 ft 07:30 - 09:35 2.08 DRILL N DPRB PROD1 Wiper trip to 8000 ft & tie-in. Clean PU & otherwise clean to the window. Circ thru EDC @ 3bpm while PUH to 8000'. 09:35 - 09:45 0.17 DRILL N DPRB PROD1 Log for tie-ie (+2 ft corr. 09:45 - 10:15 0.50 DRILL N DPRB PROD1 Wiper to TD -clean. 10:15 - 12:55 2.67 DRILL N DPRB PROD1 Drilling lateral section at 90deg RTF from 10,250 ft Op=2.71 /2.65 bpm CTP = 3350 / 3140 psi WOB / ROP = 1-4k / 60-90 fph. Vp = 395 bbl Drill to 10,400 ft (drilled through fault @ 10,352 ft) 12:55 - 13:55 1.00 DRILL N DPRB PROD1 Wiper trip. Clean PU. Start up'B' centrifuge & simultaneously run both centrifuges. 13:55 - 17:10 3.25 DRILL N DPRB PROD1 Drilling lateral section at 120deg LTF from 10,400 ft Op = 2.71 / 2.65 bpm CTP = 3300 / 3080 psi WOB / ROP = 1-4k / 60-90 fph. ECD=10.15 psi, DHT/ST=136/101 Vp = 394 bbl Drill to 10 552 ft 17:10 - 18:55 1.75 DRILL N DPRB PROD1 Wiper trip. Clean PU. 18:55 - 20:40 1.75 DRILL N DPRB PROD1 Drilling lateral section at 90deg LTF from 10,552 ft Drilling in shale from 10415 ft to 10,583 ft, The API units dropped down from 140 to 58 API units at 10,583 ft. Drilling ahead Op = 2.56 / 2.50 bpm CTP = 2980 / psi WOB / ROP = 1-4k / 60-90 fph. ECD=10.21 psi, DHT/ST=140/101 Vp = 373 bbl 20:40 - 22:30 1.83 DRILL N DPRB PROD1 Wiper trip to 8000 ft and making ready to conduct mud swap 22:30 - 23:30 1.00 DRILL N DPRB PROD1 Tie in at 9,130 ft as per MWD hand. Corrected +1 ft. SD pump and closed EDC. Orient TF to 180 deg RIH with drilled Printed: 12/19/2007 2:44:18 PM ~ ~ BP EXPLORATION Page 32 of 40 .Operations Summary Report Legal Well Name: 18-13A Common Well Name: 18-13A Event Name: DRILL+COMPLETE Contractor Name: NORDIC CALISTA Rig Name: NORDIC 2 Date 11/29/2007 From - To Hours ..Task Code NPT Spud Date: 11/3/1987 Start: 10/27/2007 End: 11/7/2007 Rig Release: 12/9/2007 Rig Number: :Phase Description of Operations 22:30 - 23:30 1.00 DRILL N DPRB PROD1 toolfaces RIH and tagged bottom at 10633 ft 23:30 - 00:00 0.50 DRILL N DPRB PROD1 Drilling lateral section at 90 120 deg LTF from 10,633 ft 11/30/2007 100:00 - 01:45 I 1.751 DRILL I N 01:45 - 03:50 I 2.081 DRILL I N 03:50 - 06:00 I 2.171 DRILL I N 06:00 - 07:50 07:50 - 11:05 1.831 DRILL I N 3.251 DRILL I N 11:05 - 13:15 2.17 DRILL N 13:15 - 13:35 0.33 DRILL N 13:35 - 13:55 0.33 DRILL N 13:55 - 14:55 1.00 DRILL N 14:55 - 16:50 1.92 DRILL N 16:50 - 17:00 0.17 DRILL N 17:00 - 17:20 0.33 DRILL N Op=2.54/2.48 bpm CTP = 2980 / 3000psi WOB / ROP = 1-4k / 40-90 fph. ECD=10.25 ppg Started mud swap at 10,625 ft DPRB PROD1 Drilling lateral section at 90 to 120 deg LTF from 10,633 ft to 10,635 ft and back into the shale (129 api units). Trying to level out at between 8687 ft 8,690 ft TVDss Op = 2.54 / 2.48 bpm CTP = 2980 / 3100psi WOB / ROP = 1-3k / 100 fph. ECD=10.25 ppg Turned from Right TF to left TF at 10,705 ft Finished mud swap DPRB PROD1 Wiper trip from 10,779 ft to 9,200 ft Pulled tight at 10,630 ft; where we got up in the shale again. DPRB PROD1 Drilling lateral section 40-60 RTF from 10,783 ft to Trying to level out at between 8,687 ft and 8,691 ft TVDss Op=2.46/2.40 bpm CTP = 2831 / 2950psi WOB / ROP = 1-3k / 40-60 fph. ECD=9.92 ppg Vp = 421 bbl Drilled to 10884' DPRB PROD1 Wiper trip. Clean PU. 10520' overpull & slight motor work, possible TF change. DPRB PROD1 Drilling lateral section 90 RTF from 10,884 ft Trying to hold 8,690 ft and 8,693 ft TVDss Qp = 2.62 / 2.60 bpm CTP = 3100 / 2950psi WOB / ROP = 1-3k / 40-60 fph. ECD=10.10 ppg Vp = 392 bbl Drilled to 10,985' Add defoamer to pits. DPRB PROD1 Wiper to 8000ft. DPRB PROD1 Wiper to window. DPRB PROD1 Log for tie-in (+3ft) DPRB PROD1 Wiper to TD. DPRB PROD1 Drilling lateral section 90 RTF from 10,985 ft Trying to hold 8,690 ft and 8,693 ft TVDss Op=2.73/2.65 bpm CTP = 3100 / 2800psi WOB / ROP = 1-3k / 40-100 fph. ECD=10.17 ppg Vp = 343 bbl Drilled to 11,087' DPRB PROD1 Stacking weight. 150ft wiper trip. Clean PU & no set downs. DPRB PROD1 Drilling lateral section 90 LTF from 11,087 ft Trying to hold 8,688 ft TVDss Op=2.78/2.69 bpm CTP = 3290 / 3120psi Printed: 12/19/2007 2:44:18 PM BP EXPLORATION Page 33 of 40 ,`Operations Summary Report Legal Well Name: 18-13A Common Well Name: 18-13A .Spud Date: 11/3/1987 Event Name: DRILL+COMPLETE Start: 10/27/2007 End: 11/7/2007 Contractor Name: NORDIC CALISTA Rig Release: 12/9/2007 Rig Name: NORDIC 2 Rig Number: Date From - To -Hours Task Code NPT Phase: Description of Operations 11/30/2007 17:00 - 17:20 0.33 DRILL N DPRB PROD1 WOB / ROP = 1-3k / 40-100 fph. ECD=10.21 ppg Vp = 357 bbl (centrifuges are running) Drilled to 11,097 ft 17:20 - 19:55 2.58 DRILL N DPRB PROD1 Wiper trip to 9210 Talked with Chuck Shieve with AOGCC, he wavered function testing the BOP until we are out of the hole in the next 24 hours 19:55 - 20:30 0.58 DRILL N DPRB PROD1 Drilling lateral starting at 11,097 ft to 11,113 ft at 90 L TF at 120E Op=2.52/2.43 bpm CTP = 2850 / 3150psi WOB / ROP = 1-3k / 40-100 fph. ECD=10.15 ppg Vp = 324 bbl 20:30 - 20:45 0.25 DRILL N DPRB PROD1 Stacking weight. 150ft wiper trip. Clean PU & no set downs. Waiting on mud swap 20:45 - 21:50 1.08 DRILL N DPRB PROD1 Drilling lateral starting at 11,113 ft TF at 90L Op = 2.52 / 2.43 bpm CTP = 2850 / 3150psi WOB / ROP = 1-3k / 40-100 fph. ECD=10.15 ppg Vp = 334 bbl Mud is aired up due to soda ash concentation 21:50 - 00:00 2.17 DRILL N PROD1 Wiper trip to 9,210 ft to clean up after drilling 100 ft and timing for new mud. 12/1/2007 00:00 - 00:45 0.75 DRILL N DPRB PROD1 Finished wiper trip, clean all of the way Started mud swap at 11093 ft 00:45 - 02:30 1.75 DRILL N DPRB PROD1 Drilling lateral. Starting at 11,194 ft TF at 90L-120 L-160L toolface Trying to stay between the Kavik Shale the the shale stringer above. Trying to maintain a 8688 ft TVDss. Still having trouble getting WOB Op=2.65/2.60 bpm CTP = 2830 / 3150psi WOB / ROP = 1-3k / 40-100 fph. ECD=9.80 ppg Made small wiper to clean up after mud swap and fix a reel house heater. 02:30 - 06:00 3.50 DRILL N DPRB PROD1 POOH to pick up a agitator and BC bit. Inspected the last 200 ft CT 06:00 - 09:00 3.00 DRILL N DPRB PROD1 .Stop at 200ft. Flow check. Pop off well & inspect last 200 ft of coil. Blow down & purge BHA. LD on catwalk to change out LOC o-rings.,Perform BOPE function test per AOGCC regs - good test. Fill hole -less than 1 bbl. Inspect bit, partially plugged with cement debris (spiral shaped -from a-line wire) from previous cementjob & one small piece or rubber (assume from motor) - 1/4 cup of cement, bit was 1-1. Inspect upper portion of motor -appears to be flow cut, change out motor & dial up to 1.2 AKO setting. Inspect flow ports on LOC on BHI tools.- partially plugged with cement debris, break apart & clean. Inspect high pressure filter in reel house -gummed up but no debris. Change out screens on shaker. Remove check valve from UOC (check valve bodies were washed out, inner body showed signs of wash out) & MU agitator & nozzle. Stab onto well & circulate 1 coil volume. Clean debris (cement Printed: 12/19/2007 2:44:18 PM ~ ~ BP EXPLORATION Page 34 of 40 Operations Sumrnary Report Legal Well Name: 18-13A Common Well Name: 18-13A Spud Date: 11/3/1987 Event Name: DRILL+COMPLETE Start: 10/27/2007 End: 11/7/2007 Contractor Name: NORDIC CALISTA Rig Release: 12/9/2007 Rig Name: NORDIC 2 Rig Number: Dater I From - To I Hours I Task I Code I NPT I .Phase I Description of Operations 12/1 /2007 06:00 - 09:00 09:00 - 09:50 09:50 - 13:00 13:00 - 15:20 15:20 - 15:35 15:35 - 17:45 17:45 - 21:30 3.00 DRILL N 0.83 DRILL N 3.17 DRILL N 2.33 DRILL N 0.25 DRILL N 2.17 DRILL N DPRB PROD1 DPRB PROD1 DPRB I PROD1 DPRB I PROD1 DPRB PROD1 DPRB PROD1 chunks) from lower (dart style) check valves. Pop off well & clean out agitator (recovered a small amount of debris on top of agitator). PJSM for cutting coil. Cut 100ft of coil. Dress end of coil. Install SLB CTC. Install BHI UPC. Pull test to 40k. Fill hole - 5bbl/hr losses. PT to 4000 psi - good test. Scribe agitator to motor, MU HCC BC bit & place in well. PU BHA & MU to motor. PU injector & MU to BHA. Stab onto well. Power up tools. Set counters. Open EDC. Log down for tie-in (-5ft corr. RIH circulating 2.5bpm/3440 psi. Seeing 100-200 psi motor & slight set downs past 9600ft. Set downs, stalls & motor work starting at 10,430ft to 10,590ft (shale zone), fight for 20min. 300psi motor work & WOB from 10,900ft-11,000ft. 600psi motor work/stalls & WOB from 11,130ft-11,000ft. Tagged bottom at 11229 ft and found the orienter will not 3.751 DRILL I N DFAL I PROD1 21:30 - 22:30 1.00 DRILL N DFAL PROD1 22:30 - 00:00 1.50 DRILL N DFAL PROD1 12/2/2007 00:00 - 00:15 0.25 DRILL N DFAL PROD1 00:15 - 00:30 0.25 DRILL N DFAL PROD1 00:30 - 02:45 2.25 DRILL N DFAL PROD1 02:45 - 06:00 I 3.251 DRILL I N I DFAL I PROD1 06:00 - 07:50 I 1.831 DRILL I N I DFAL I PROD1 07:50 - 09:45 1.92 DRILL N DFAL PROD1 09:45 - 09:55 0.17 DRILL N DFAL PROD1 09:55 - 11:45 1.83 DRILL N DFAL PROD1 11:45 - 12:20 0.58 DRILL N DPRB PROD1 12:20 - 14:35 I 2.251 DRILL I N I DPRB I PROD1 POOH. Open EDC above the WS. POOH Closed EDC. Change out BHA RIH RIH Log tie-in and corrected (-6 ft) orient TF to low side RIH with drilled TF. CTP cycling +500 psi at times while RIH with out any WOB. Op = 2.54 bpm Set down at 10,513 ft 110LWorked through on 2nd attempt RIH and set down again at 10,571 ft. Lost the HOT again in the hole. Working way in the hole without a HOT. Rebooted BHI computer and try to orient . Stopped at 10,806 ft. PUH trying to orient TF. BHI unable to orient TF while RIH or PUH at 2.5 bpm. Will not test BHI theories in this well on what flow rates will allow us to orient TF POOH without orientor. Pulled tight several times in the shale at 10,450 ft to 10,550 ft. rest of the hole is OK. Above the WS, open EDC and inc Qp to 3.5 bpm and POOH. At lower flowrates, able to orient TF, which could mean a short in the HOT section of the tool. Orientor had 20 previous hrs. Tag up. Flow check well. Break off BHA & place injector over bung hole to circulate. Blow down & purge BHA. LD BHA on catwalk & break off & replace DGS & HOT with new ones (no hours). Bit was 1-1 with 5 chipped teeth. SLB checked brushes on traction motor. Fill hole - 5 bbts. Dial down motor to 1.1 AKO. MU used DS49 PDC 3.75" bit to motor. Scribe to HS. PU motor & agitator & place in hole. MU BHI BHA to motor & scribe to HS. PU injector & MU to BHA. Stab onto well. Power up & check tools. Set counters. Open EDC &RIH. Log for tie-in. (-6ft corr. Close EDC. Wiper to TD. Circ through bit at 2.28bpm/3460psi. Tag bottom at 11,222ft~p(ork shale section until clean from TD - 11,100ft. Drilling lateral section 110 LTF from 11,122 ft Trying to drop gradually to 8,697 ft TVDss Op = 2.24 / 2.20 bpm Printed: 12/19/2007 2:44:18 PM • • $P EXPLORATION Page 35 of 40 Operations .Summary Report Legal Well Name: 18-13A Common Well Name: 1 8-13A Spud Date: 11/3/1987 Event Name: DRILL+COMPLETE Start: 10/27/2007 End: 11/7/2007 Contractor Name: NORDIC CALISTA Rig Release: 12/9/2007 Rig Name: NORDIC 2 Rig Number: Date From - To Hours Task. Code NPT Phase Description of Operations 12/2/2007 12:20 - 14:35 2.25 DRILL N DPRB PROD1 CTP = 4000 / 3470psi 14:35 - 16:10 1.58 DRILL N DPRB PROD1 16:10 - 17:50 1.67 DRILL N DPRB PROD1 17:50 - 18:15 0.42 DRILL N DPRB PROD1 18:15 - 19:15 1.00 DRILL N DPRB PROD1 19:15 - 20:12 0.95 DRILL N DPRB PROD1 20:12 - 00:00 3.80 DRILL N PROD1 WOB / ROP = 1-5k / 40-120 fph. ECD=9.83 ppg Vp = 257 bbl (pump 150 bbls of new mud down hole) Wiper trip. Pump at 2.5bpm/3800psi. Motor work and tight at 11,220ft & 11,200ft - 11,193ft. Very ratty from 10,450-10,470ft. Otherwise clean. Wiper to TD. Set down at 10,480ft & 10,577ft (both ends of the shale zone). ' Drilling lateral section 60 LTF from 11,350 ft Trying to drop gradually to 8,697 ft TVDss Op = 2.36 / 2.20 bpm CTP = 4000 / 3470psi WOB / ROP = 1-5k / 40-120 fph. ECD=10.25 ppg Vp = 363 bbl PUH and check the integrity of the shales at 10,435 to 10585 ft and 11,125 ft to 11,235 ft Pulled little ratty frm 10,650 ft. 10495 ft pulled 12k over with 700 psi motor work.The CT turns up against the stops and the TF is 180 deg out of phase. Pulled to 10,300 ft, last 200 ft clean. Pump pressure is cyclic up to 400 psi without the bit setting down RIH with drilled TF and check the shales. Set down a little at 10,578 ft. The CT turned towards the stops and that put the TF 180 deg out at 10,578 ft This is a transition between sand and shale beds at 10.578 ft. RIH clean to TD. Wiper trip was good Drilling lateral section 90 LTF from 11,378 ft to 11,452 ft Trying to drop gradually to 8,697 ft TVDss Op=2.64/2.50 bpm CTP = 3435 / 3670psi WOB / ROP = 1-5k / 40-70 fph. Controlled the ROP to reduce the trouble we are having with the DGS and HOT ECD=10.35 ppg Vp = 345 bbl Hit another shale stringer at 11,410 ft, ROP dropped down to 5-10 fph 12/3/2007 00:00 - 01:00 1.00 DRILL N DPRB PROD1 Drilling lateral section 90 LTF from 11,452 ft - Op=2.64/2.50bpm CTP = 3435 / 3670psi WOB / ROP = 1-5k / 40-70 fph. ECD=10.35 ppg Vp = 304 bbl Had some issues with SLB's Ccat program. SD and run with just CTDS 01:00 - 04:15 3.25 DRILL N DPRB PROD1 Wiper trip to 8000 ft and tie-in Clean POOH Tied in at 9,125 ft and corrected -6 ft. Closed EDC and RIH past the WS 04:15 - 06:15 2.00 DRILL N DPRB PROD1 Run in open hole at drilled toolface 06:15 - 09:15 3.00 DRILL N DPRB PROD1 Drilling lateral section 90 LTF from 11,475 ft Op = 2.64 / 2.50 bpm CTP = 3435 / 3670psi WOB / ROP = 1-5k / 40-70 fph. ECD=10.35 ppg Vp = 275 bbl Printed: 12/19/2007 2:44:18 PM ~ ~ BP' EXPLORATION Page 36 of 40 Operations Summary Report Legal Well Name: 18-13A Common Well Name: 18-13A Event Name: DRILL+COMPLETE Contractor Name: NORDIC CALISTA Rig Name: NORDIC 2 Date` From - To Hours Task Code NPT Spud Date: 11/3/1987 Start: 10/27/2007 End: 11 /7/2007 Rig Release: 12/9/2007 Rig Number: 'Phase Description of Operations 12/3/2007 06:15 - 09:15 3.00 DRILL N DPRB PROD1 Drill to 11 541ft 09:15 - 12:30 3.25 DRILL P PROD1 TD has been reached. Wiper to window for tie-in. Order out 50bb1 125k LSRV liner pill. 12:30 - 12:35 0.08 DRILL P PROD1 Log for tie-in (+14ft corr. 12:35 - 15:25 2.83 DRILL P PROD1 Wiper to TD. Pump 150k LSRV with 2ppb Alpine Beads liner pill down coil in trip in the hole. Tag bottom twice at 11550ft. Lay in liner pill from TD. 15:25 - 17:55 2.50 DRILL P PROD1 Liner pill is out of coil at 8977ft. Stop pumping, open EDC. POH circulating through EDC. Paint EOP flag at 6200ft. PJSM while POH regarding handling BHA. Bring BOT liner handling tools to RF. 17:55 - 18:15 0.33 DRILL P PROD1 Tag up. Stop pumping & check for flow. Pop off & place injector over bung hole &circ @ min rate. Blow down & purge BHA. LD BHA on catwalk. Break out agitator & bit. 18:15 - 21:00 2.75 DRILL P PROD1 RU to run liner, held PJSM and discussed muster area. 21:00 - 00:00 3.00 CASE P RUNPRD Run liner as per Liner Summary Note: Winds blowing at 50 to 70 mph, derrick moving some Ran 50 jts 2-7/8" STL, fill liner, unloaded 38 jts 2-7/8" from pipe shed 12/4/2007 00:00 - 03:50 3.83 CASE P RUNPRD Run 3-3/16" and 3-1/2" liner Winds still gusting to 50 to 60 mph and Phase 2 03:50 - 04:50 1.00 CASE P RUNPRD Filled the hole and PU BOT CTLRT. Stab injector 04:50 - 06:15 1.42 CASE P RUNPRD RIH with liner Phase II at present. Stop at EOP flag at 6200ft. No correction needed. RIW = 17.5k. WT ck @ 9200ft = 35k. 06:15 - 07:00 0.75 CASE P RUNPRD RIH into o en hole with liner, circ through EDC at 0.3 bpm. Stacking weight at 9700ft, 10500ft, 10550ft, 10600ft, 10800ft, 10890ft. Stopped at 10890ft, stack weight to work through. Stacking weight at 10990ft to 11050ft. Stacking weight at 11175ft to 11330ft. Stopped at 11330ft, stack weight to work through. Stopped at 11447ft, bleed off coil pressure, bobble past. 07:00 - 07:05 0.08 CASE P RUNPRD stack out at 11 545ft. PU 47k up. RIH & set down at 11,541ft - repeattwice & get same results. Pump down coil 1bpm & verify returns, slight losses (.1bpm). PU to release from liner, 29k up. 07;05 - 09:15 2.17 CASE P RUNPRD POH, circ down coil to keep hole full. 09:15 - 09:50 0.58 CASE N DFAL RUNPRD Tag up. Stop pumping & flow check well. Pop off well. Break off BHA. Place injector over bung &circ at min rate. LD BHA on catwalk. 09:50 - 10:35 0.75 CASE N DFAL RUNPRD Discuss hazards w/ SLB N2 person. RU SLB N2 unit. Begin pumping 60bbls of water into coil followed by 15bbls of inhibited water. Fill hole - 5bbl/hr losses. 10:35 - 10:40 0.08 CASE N DFAL RUNPRD PJSM regarding pumping N2 & blowing down reel. Begin cooling down unit. 10:40 - 13:00 2.33 CASE N DFAL RUNPRD Continue to pump water into coil. P.T. Bleed down CT 13:00 - 18:00 5.00 CASE N DFAL RUNPRD Unstab, cut off CTC and make ready to pull CT across pipe shed. RD hardline in preparation of dropping the reel Hole took 5 bbl of fluid since 13:00 hrs (3-3/4 hrs) Unstab coil. Secure to reel. Open bay door and lower a-coil onto storage trailer. Spot cement reel trailer under reel house. Lift reel into place with bridge crane and secure same. 18:00 - 19:00 1.00 CEMT N DFAL RUNPRD Install hard line inside reel. 19:00 - 19:30 0.50 CEMT N DFAL RUNPRD Hold PJSM to discuss stabbing coil and plan forward. Printed: 12/19/2007 2:44:18 PM • • BP EXPLORATION Page 37 of 40 Operations Summary Report Legal Well Name: 18-13A Common Well Name: 18-13A Spud Date: 11/3/1987 Event Name: DRILL+COMPLETE Start: 10/27/2007 End: 11/7/2007 Contractor Name: NORDIC CALISTA Rig Release: 12/9/2007 Rig Name: NORDIC 2 Rig Number: Date From. -`To Hours Task Code NPT Phase Description of Operations 12/4/2007 19:30 - 21:00 1.50 CEMT N DFAL RUNPRD Install grapple in coil. Pull test with stabbing winch. Pull coil across pipe shed and stab in injector. 21:00 - 00:00 3.00 CEMT N DFAL RUNPRD Make up dart catcher. Circulate flo pro around coil. Slow going due to cold reel and mud. Circulate dart to determine coil volume. 12/5/2007 00:00 - 01:00 1.00 CEMT N DFAL RUNPRD Install Baker connector. Pressure and pull test same. Circulate dart. Coil volume: 58.8 bbls. 01:00 - 01:45 0.75 CEMT N DFAL RUNPRD Hold PJSM. MU Baker CTLRT tools on two jts of PH6 pipe. Stab coil. Get on well. 01:45 - 04:00 2.25 CEMT N DFAL RUNPRD Run in hole. 33k# up, 17k# do wt. Set down and latch liner at 8596' 04:00 - 06:00 2.00 CEMT N DFAL RUNPRD PU to 46k#. Able to move liner up and down. Attempt to circulate. 2590 psi at 0.59 in/0.19 out. Reciprocate liner up and down 45' while circulating. Drop ball. ,Continue to circulate. 0.53 in/0.37 out. 06:00 - 10:40 4.67 CEMT N DFAL RUNPRD Circulate well to 2%KCL Qp = 1.33 / 0.68 bpm CTP 1670 psi With 100 bbl circulated up the annulus, the Op = 1.39 / 1.25 bpm at 1099 psi Circulated wellbore clean. Unload pits and MIRU cement trucks. Tight quarters around rig due to wind storm last week. 10:40 - 11:05 0.42 CEMT N DFAL RUNPRD PJSM on pumping cementjob 11:05 - 13:00 1.92 CEMT N DFAL RUNPRD Batched up at 11:05 hrs, Cement at density at 11:17 hrs. Finish RU to cement liner. Pumped 2 bbl 2% KCL, PT to 4000 psi. O en u and umped 29.1 bbl's of 15.8ppg Class "G" cement at 2.00 bpm. SD and washed line to cementer an insta e dart. Pressure uo to 500 psi, zeroed MM and lanched same. Displace cement at 2.00 bpm chasing cement. Added 10k String wt .Inc Op 2.5 bpm at 26 bbl behind Latch LWP with 60.1 bbls and sheared at 3600 psi Displaced cement using 20 bbl and SD without seeing the LWP dart seating in the latch collar. Circulated 27.1 bbl of cement u the liner annulus Open Baker Choke, floats held. Put 500 psi on CT and unstung from deployment sleeve. 13:00 - 16:16 3.27 CEMT N DFAL RUNPRD POOH replacing cement voidage 16:16 - 16:30 0.23 CEMT N DFAL RUNPRD Held PJSM on BHA handling. 16:30 - 17:00 0.50 CEMT N DFAL RUNPRD LD liner cementing BHA. Cement seen on the CTC 17:00 - 17:15 0.25 CEMT P RUNPRD PJSM with SLM Logging Engineer. 17:15 - 22:15 5.00 EVAL P LOWER1 PU MCNL/GR/CCL cleanout BHA on 96 jts of CSH. 22:15 - 00:00 1.75 EVAL P LOWER1 Run in hole. 12/6/2007 00:00 - 00:30 0.50 EVAL P LOWER1 Begin logging down at 30 fpm. Tag up at 8427'. 00:30 - 01:30 1.00 CEMT P RUNPRD Mitl cement. 1692 psi at 1.52 bpm. 100-250 psi motor wrk. Mill ahead at 10 to 20 fph. Circulate 5 bbl 2# bio sweeps. Cement cleaned up from liner top down 01:30 - 03;30 2.00 EVAL P LOWER1 Continue logging in hole. Mill through a hard spot at 9985'. Continue to log in hole. Tag at 11,518'. 03:30 - 04:30 1.00 EVAL P LOWER1 Log up pass at 60 FPM from PBTD. Circulate 10 bbl bio sweep to clean hole. 04:30 - 08:15 3.75 EVAL P LOWER1 Run in hole to PBTD. Lay in perf pill while pulling out of hole. 08:15 - 11:30 3.25 EVAL P LOWER1 Dropped 5/8" ball to open shear cir sub POOH standing back CSH. RD MCNL tool and LD motor mill Printed: 12/19/2007 2:44:18 PM BP EXPLORATION Page 38 of 40 Operations Summary;Report Legal Well Name: 18-13A Common Well Name: 1 8-13A Spud Date: 11/3/1987 Event Name: DRILL+COMPLETE Start: 10/27/2007 End: 11/7/2007 Contractor Name: NORDIC CALISTA Rig Release: 12/9/2007 Rig Name: NORDIC 2 Rig Number: .Date From - To Hours Task Code NPT Phase Description of Operations 12/6/2007 11:30 - 13:30 2.00 EVAL P LOWER1 Downloading data on MCNL tool Unable to get data off of the tools. Reprogramme the back upCNL/GR/CCL tool. RU and PT the liner la to 2000 si Bleed off in 5 min to 1500 si. Routed the PT hose to the wellhead to bypass all surface equipment Pressured up to 2000 psi and bleed off to 1600 psi instanly and then 12 min ressure dro ed to 13:30 - 16:20 2.83 EVAL N DFAL LOWER1 RU to rerun MCNL Run MCNL/GR tool with 1-1/4" CSH. 16:20 - 17:30 1.17 EVAL N DFAL LOWER1 RIH with MCNL / GR CCL logging tool without circulating 17:30 - 20:00 2.50 EVAL N DFAL LOWER1 Log starting at 8100 ft at 30 fpm. Tag PBTD at 11,520'. 20:00 - 20:45 0.75 EVAL N DFAL LOWERI Log from TD to 8100' at 60 fpm. 20:45 - 22:00 1.25 EVAL N DFAL LOWER1 Pull out of hole. Fill down coil once above pert pill. Hole fill normal. 22:00 - 00:00 2.00 EVAL N DFAL LOWER1 Hold PJSM. Open circ sub to drain CSH. Stand back CSH in derrick. 12/7/2007 00:00 - 01:30 1.50 EVAL N DFAL LOWER1 Continue to stand back CSH. At logging tools. Remove source and LD logging tools. Verify quality of log data. Corrected log data indicates PBTD of 11,509'. 01:30 - 03:00 I 1.501 EVAL I N 03:00 - 06:00 3.00 I PERFO~ N 06:00 - 06:30 0.50 PERFO N 06:30 - 11:15 I 4.751 PERFOBI N 11:15 - 13:15 I 2.00 I PERFOBI N DFAL LOWER1 Run in hole with 41 jts of CSH. POOH and LD singles. DFAL LOWER1 Hold PJSM with crew to discuss handling guns. DFAL LOWERI PJSM and covered issues with handling and RIH with 2" Perf guns. SLB has 2 trainees and a mentor to assist them in making up and running guns. Talked to them about hazard asociated with the operations and how to midigate them DFAL LOWER1 Runnning pert guns as per SLB and BP's SOP's Run 1-1/4" CSH DFAL LOWER1 RIH tp perforate. Tagged PBTD at 11, 519 ft, corrected to 11,509 ft 13:15 - 14:00 0.75 PERFO N DFAL LOWER1 Dropped 1/2" Ball, Pressure to 500 psi and launch with 20 bbl of flo-pro Vol to pert 61.3 bbl Displacing ball at 2.00 bpm Ball on seat at 57.8 bbo ,sheared at 3200 psi Perforated:10.160 ft .to 10.310 ft 6 sof 14:00 - 16:08 I 2.131 P N DFAL I LOWER1 I PUH and lined out and pump across the top. Checked flow at 16:08 - 20:00 3.87 20:00 - 00:00 4.00 N N 112/8/2007 100:00 - 02:00 I 2.001 PERFOBI N 02:00 - 02:45 I 0.751 CASE I N 02:45 - 07:00 I 4.251 BOPSUR P 07:00 - 09:00 I 2.00 I CASE I P the top of the liner OK DFAL LOWERI Rig Service and LD 1-1/4" CSH DFAL LOWER1 Hold PJSM to discuss handling guns, hazards, and proper procedures. Remove firing head. Lay down guns in pipe shed. Bundle and wrap to prevent leakage. DFAL LOWER1 Continue to lay down pert guns. Bundle, drain, and remove from rig. DFAL RUNPRD MU swirl nozzle. Jet out BOPs to remove losse cement etc. Grease manifold & valves. RUNPRD Perform bi-weekly pressure test of BOP equipment. Witness of test waived by L. Grimaldi, AOGCC. RUNPRD RU to PU fill cleanout BHA PU injector and install BOT Slip Printed: 12/19/2007 2:44:18 PM ~ r BP EXPLORATION Page 39 of 40 Operations Summary Report Legal Well Name: 18-13A Common Well Name: 18-13A Spud Date: 11/3/1987 Event Name: DRILL+COMPLETE Start: 10/27/2007 End: 11/7/2007 Contractor Name: NORDIC CALISTA Rig Release: 12/9/2007 Rig Name: NORDIC 2 Rig Number: Date From - To .Hours Task Code. NPT Phase Description of Operations 12/8/2007 07:00 - 09:00 2.00 CASE P RUNPRD type CTC ,pull test to 3$k and PT to 3500 psi. OK PU BHA, RIH and found the bottom set of 2-3/8" combi's 1 ram closed and 1 ram o en. Investiagate 09:00 - 11:00 I 2.001 CASE I N 11:00 - 14:00 3.00 CASE N 14:00 - 16:25 2.42 CASE N 16:25 - 17:05 0.671 CASE N 17:05 - 19:00 1.92 CASE N 19:00 - 19:45 0.75 CASE N 19:45 - 21:30 I 1.751 CASE I N 21:30 - 22:30 I 1.001 CASE I N 22:30 - 00:00 1.50 CASE N 12/9/2007 00:00 - 00:15 0.25 CASE N 00:15 - 00:30 0.25 CASE N 00:30 - 02:00 1.50 CASE N 02:00 - 03:00 I 1.001 CASE I N 03:00 - 05:15 2.25 CASE N 05:15 - 06:45 1.50 CASE N 06:45 - 08:00 1.25 CASE P 08:00 - 09:30 1.50 CASE P SFAL RUNPRD Open up bottom TOT door Found cement in behind the rams. Cleaned out and found the top seal had rolled ou into the hole, Open all door and check behine the rams. VBR ram cavity looks OK. PU test joint and make ready to PT the bott0om set of combi's and body test the remaining BOP HMAN RUNPRD Fishing out 25 ft measuring tape setting on top of the swab valve SFAL RUNPRD PT BOP stack. Had to change out the top ram packer and rest. PU injector and PT the inner reel valve DFAL RUNPRD PU Fill cleanourt BHA DFAL RUNPRD RIH to clean out cement on top of liner. DFAL RUNPRD Mill ahead from 8350'. 1630 psi fs at 2.59 in/2.60 out. RIH at 25 fpm. Tag cement at 8578'. Mill ahead with a few stalls. 50-100 psi mtr work. Tag TOL at 8597' (stall) Back ream up to 8500'. Tag liner top again. Circulate 10 bbl 2# bio sweep. DFAL RUNPRD Circulate out of hole. Noted a significant amount of cement on shakers. Hold PJSM to discuss handling BHA and review plan forward. DFAL RUNPRD Tag up. Flow check. Get off well. Unstab coil. Remove DSM and string reamer. Stab coil. Get on well. DFAL RUNPRD Run in hole. Circ at min rate. DFAL RUNPRD Continue to RIH. DFAL RUNPRD 1490 psi fs at 2.62 in/2.58 out. Ream de to ment sleeve/seal bore area. Note some weight and mtr work once inside sleeve. Btm out at 8603'. PU and ream back down a second time. DFAL RUNPRD Circulate out of hole. Make up KB packer assembly. Hold PJSM to discuss handling BHA and packer. Tag up. Flow check. Get off well and unstab coil. DFAL RUNPRD Lay down motor and milling assembly. Make up 4-1 /2" Baker KB packer with pup jt spacer and setting tool. MU to 2 jts PH6 pipe. DFAL RUNPRD Stab coil. Get on well. Run in hole. DFAL RUNPRD 33k# up, 18k# do wt. Sting into tie back sleeve. Note wt drop and circ prs increase. Btm out at 8612'. PU to neutral + 1' for space out. Drop 5/8" ball and circ to setting tool at 1000 psi @ 2.2 bpm. Set packer, finish circulating clean KCL down CT RUNPRD POOH chasing clean KCL to surface RUNPRD RU LRS and PT to 3000}751. Pumped 58 bbls 90 deg diesel Printed: 12/19/2007 2:44:18 PM ~ ~ BP EXPLQRATION Page 40 of 40 Operations Surnrnary Report Legal Well Name: 18-13A Common Well Name: 1 8-13A Spud Date: 11/3/1987 Event Name: DRILL+COMPLETE Start: 10/27/2007 End: 11/7/2007 Contractor Name: NORDIC CALISTA Rig Release: 12/9/2007 Rig Name: NORDIC 2 Rig Number: Date From - To Hours Task Code NPT Phase Description of Operations 12/9/2007 08:00 - 09:30 1.50 CASE P RUNPRD down CT 09:30 - 09:45 0.25 CASE P RUNPRD POOH chasing diesel to surface for freeze protect 09:45 - 10:00 0.25 WHSUR P POST OOH, RU N2 Pumpers. Hold PJSM on pumping N2and displacing fluid in CT. 10:00 - 11:10 1.17 WHSUR P POST Checked well conditions, no flow DSM install BPV 11:10 - 11:30 0.33 WHSUR P POST PT N2 and blow down coiled tubing to Tiger Tank 11:30 - 12:45 1.25 WHSUR P POST Set injector in bung hole. 12:45 - 14:30 1.75 WHSUR P POST PJSM on rigging down BOP and rig 14:30 - 18:00 3.50 WHSUR P POST ND BOP's. Having the Pad Operator pump open the SSV to remove the fusiable. Grease crew working on repairing the SSV (leak on the bonnet) PJSM on PT the tree cap. Test tree to 5000 psi. Warm up tires Rig Released at 18:00 hrs Printed: 12/19/2007 2:44:18 PM ~ w by BP Alaska s Baker Hughes INTEQ Survey Report 1NTEQ Company: BP Amoco Date: 12/5/2007 Time: 15:23:11 Page: 1 Fkid: Prudhoe Bay Co-erditiate(NE) Reference: Well: 18-13, True NoM Site: PB DS 18 Verdcai (TVD) Refere^cr. 18-13A 54.8 WeU: 18-13 _ Secti~ (VS) Aeterc^ce: Well (O.OON,O.OOE,123.16Azi) Wetlpatb: 18-138 Survey Catc^brtio^ Method: Minimum Curvature Db: Orade Fkid: Prudhoe Bay North Sb~e UNITED STATES Map System:US State Plane Coordinate System 1927 Map Zo^e: Alaska, Zone 4 Geo Datum: NAD27 (Clarke 1866) Coordinate System: Well Centre Sys Datum: Mean Sea Level Geomagnetic Model: bggm2007 Site: PB DS 18 TR-11-14 UNITED STATES :North Slope Site Position: Northing: 5959213.15 ft Latitude: 70 17 35.252 N From: Map Fasting: 691583.44 ft Longitude: 148 26 55.555 W Position Uaeertainty: 0.00 ft North Reference: True Ground Level: 0.00 ft Grid Convergence: 1.46 deg Wefi: 15-13 Slot Name: 13 18-13 Well Postttoa: +N/-S 1605.17 ft Northing: 5960832.76 ft Latitude: 70 17 51.039 N +E/-W 590.87 ft Eastiag : 692133.18 ft Longitude: 148 26 38.331 W Positbn Uncertainty: 0.00 ft Wellpath: 18-138 Drilled From: 18-13BP81 500292175602 Tiaon Deptb: 9639.73 ft Cvre^t Datum: 18-13A Height 54.80 ft Above System Datum: Mean Sea Level Magnetk Data: 11/24/2007 1)eclinatio^: 23.62 deg Fkld Strengt>t: 57672 aT Mag Dip Angle: 80.94 deg Vertkal Section: Deptb From (TVD) +N/~ +E/-W Directioe ft ft ft deg 38.80 0.00 0.00 123.16 S^rvey Program for Definitive Weltpath Date: 11/30/2007 Validated: Yes Versto^: 3 Aet^al From To Survey Toolcode Tool Name ft ft 2706.80 9155.80 Survey #1 (2706.80-13045. 00) ( MVND MWD -Standard 9202.00 9639.73 MWD (9202.00-10578.00) (4) MWD MWD -Standard 9660.95 11550.00 MWD (9660.95-11550.00) MWD MWD -Standard Annotation MD TVD ft, ft 9639.73 8641.86 TIP 9660.95 8655.31 KOP 11550.00 8751.68 TD S^rvey: MWD Start Date: 11/30/2007 Cempaay: Baker Hughes INTEQ Engineer: Toot: MWD;MWD -Standard Tied-to: From: Detkritive Path ~ ~ by BP Alaska $ Baker Hughes INTEQ Survey Report nvTE Q Company: BP Amoco Date: 12/5!2007 Time: 15:23:11 Pale: 2 Field: Prudhoe Bay Co~erdieate(NE) Rekrcnce: Well: 18-13, True North Sfte: PB DS 18 Vertical (TVD) Rekrcece: 18-13A 54.8 Wc1I: 18-13 Sectioe (VS) Aetercece: Well (O.OON,O. OOE,123.1 8Aai) Wellpath: 18-138 Sauey Cak4latieu Method: Minimum Curvature Db: Orade Survey MD Inct Azim T1'D Sys TVD N/5 E/W MapN MapE VS DLS Tool ft deg deg R ft ft ft tt ft ft deg/100ft 9639.73 49.35 121.70 8641.86 8587.06 -1994.90 2449.61 5958901.25 694632.84 3141.84 0.00 MWD 9660.95 52.01 120.39 8655.31 8600.51 -2003.36 2463.67 5958893.16 694847.11 3158.24 13.41 MWD 9660.95 52.01 120.39 8655.31 8600.51 -2003.36 2463.67 5958893.16 894647.11 3158.24 0.00 MWD 9660.95 52.01 120.39 8655.31 8600.51 -2003.36 2463.67 5958893.16 694647.11 3158.24 0.00 MWD 9695.39 57.22 127.63 8675.26 8620.46 -2019.08 2488.88 5958878.02 694670.71 3186.27 22.85 MWD 9727.70 62.26 129.49 8691.54 5636.74 -2036.49 2508.69 5958861.19 694692.96 3214.04 16.37 MWD 9756.95 66.45 131.40 8704.19 8649.39 -2053.60 2528.74 5958844.60 694713.44 3240.19 15.49 MWD 9785.66 71.03 130.73 8714.60 8659.80 -2071.17 2548.91 5958827.56 694734.05 3266.69 16.10 MWD 9815.38 76.40 130.04 8722.93 8668.13 -2089.64 2570.63 5958809.64 694756.24 3294.98 18.21 MWD 9845.64 81.22 127.84 8728.80 8674.00 -2108.29 2593.72 5958791.59 694779.79 3324.50 17.45 MWD 9875.54 85.95 125.52 8732.14 8677.34 -2126.03 2617.54 5958774.47 694804.06 3354.15 17.60 MWD 9904.15 89.91 122.08 8733.18 8678.38 -2141.93 2641.29 5958758.18 694828.21 3382.73 18.33 MWD 9932.86 91.50 118.11 8732.82 8678.02 -2156.32 2666.12 5958745.43 694853.40 3411.39 14.89 MWD 9963.43 92.06 113.73 8731.87 8677.07 -2169.67 2693.60 5958732.79 694881.20 3441.69 14.44 MWD 9992.41 90.55 109.64 8731.21 8676.41 -2180.38 2720.51 5958722.78 694908.38 3470.08 15.04 MWD 10021.26 89.29 107.07 8731.25 8676.45 -2189.46 2747.89 5958714.40 694935.98 3497.97 9.92 MWD 10051.49 89.17 103.42 8731.66 8676.86 -2197.41 2777.05 5958707.20 694965.33 3526.72 12.08 MWD 10081.41 89.48 99.11 8732.01 8677.21 -2203.25 2806.39 5958702.11 694994.81 3554.48 14.44 MWD 10112.59 86.99 103.55 8732.97 8678.17 -2209.37 2838.94 5958696.77 695025.50 3583.40 16.32 MWD 10142.06 85.48 107.40 8734.91 8680.11 -2217.21 2865.27 5958689.65 695054.02 3611.41 14.01 MWD 10171.09 87.57 110.97 8736.67 8681.87 -2226.73 2892.63 5958680.84 695081.62 3639.52 14.23 MWD 10200.51 88.18 114.45 8737.76 8682.96 -2238.08 2919.75 5958670.19 695109.01 3668.43 12.00 MWD 10229.96 89.57 118.39 8738.34 8683.54 -2251.18 2946.11 5958657.77 695135.70 3697.67 14.18 MWD 10260.33 91.01 120.21 8738.19 8683.39 -2266.04 2972.59 5958643.59 695162.55 3727.96 7.64 MWD 10290.36 89.72 127.71 8737.99 8683.19 -2282.81 2997.48 5958627.47 695187.86 3757.97 25.34 MWD 10319.69 89.02 132.24 8738.32 8683.52 -2301.64 3019.95 5958609.21 695210.80 3787.08 15.63 MWD 10347.88 88.86 134.98 8738.84 8684.04 -2321.08 3040.36 5958590.30 695231.70 3814.80 9.73 MWD 10376.26 90.98 130.97 8738.88 8684.08 -2340.42 3061.11 5958571.50 695252.94 3842.75 15.98 MWD 10408.84 91.44 126.16 8738.19 8683.39 -2380.72 3086.58 5958551.88 695278.91 3875.17 14.83 MWD 10440.24 88.53 123.57 8738.20 8683.40 -2378.67 3112.33 5958534.58 695305.12 3906.55 12.41 MWD 10469.44 87.70 119.48 8739.16 8684.36 -2393.92 3137.21 5958519.96 695330.37 3935.72 14.28 MWD 10500.28 87.79 115.24 8740.37 8685.57 -2408.08 3164.57 5958506.51 695358.09 3966.37 13.74 MWD 10529.88 87.39 111.44 8741.62 8686.82 -2419.80 3191.72 5958495.49 695385.52 3995.50 12.90 MWD 10558.77 88.25 108.23 8742.72 8687.92 -2429.59 3218.87 5958486.40 695412.92 4023.59 11.50 MWD 10589.10 90.74 104.81 8742.98 8688.18 -2438.21 3247.94 5958478.52 695442.20 4052.64 13.95 MWD 10620.28 91.78 101.00 8742.30 8687.50 -2445.17 3278.32 5958472.34 695472.74 4081.88 12.66 MWD 10650.78 90.12 97.25 8741.79 8686.99 -2450.01 3308.42 5958468.28 695502.96 4109.73 13.44 MWD 10679.78 89.80 93.91 8741.86 8687.06 -2452.83 3337.28 5958466.20 695531.88 4135.43 11.86 MWD 10711.90 90.34 90.19 8741.88 8687.08 -2453.98 3369.37 5958465.87 695563.99 4162.93 11.81 MWD 10741.48 86.84 92.24 8742.61 8687.81 -2454.60 3398.93 5958466.00 695583.55 4188.02 13.71 MWD 10769.94 86.19 96.48 8744.34 8689.54 -2456.76 3427.25 5958464.56 695621.91 4212.90 15.04 MWD 10800.94 87.61 101.08 8746.02 8691.22 -2461.49 3457.83 5958460.62 695652.61 4241.09 15.51 MWD 10830.23 90.40 105.43 8746.53 8691.73 -2468.20 3486.33 5958454.64 695681.18 4268.62 17.64 MWD 10859.80 91.35 110.20 8746.07 8691.27 -2477.24 3514.47 5958448.32 695709.62 4297.12 16.45 MWD 10888.19 90.58 114.68 8745.60 8690.80 -2488.08 3540.70 5958436.16 695736.12 4325.00 16.01 MWD 10918.86 89.20 118.02 8745.65 8690.85 -2501.89 3568.18 5958423.26 695763.93 4355.45 11.78 MWD 10947.96 89.02 122.62 8746.11 8691.31 -2518.37 3593.29 5958409.22 695789.41 4384.51 15.82 MWD 10976.25 89.97 127.33 8746.36 8691.56 -2532.58 3618.48 5958393.61 695812.99 4412.77 16.98 MWD 11009.28 91.17 133.55 8748.03 8691.23 -2554.00 3641.59 5958372.85 695838.65 4445.52 19.18 MWD 11040.19 92.87 133.76 87M.99 8690.19 -2575.32 3863.94 5958352.10 895861.54 4475.89 4.90 MWD 11073.10 93.90 128.24 8743.10 8688.30 -2596.87 3888.72 5958331.20 695888.87 4508.43 17.16 MWD 11106.14 91.63 125.16 8741.51 8688.71 -2816.59 3715.18 5958312.16 695913.82 4541.36 11.57 MWD 11140.84 91.44 120.49 8740.58 8885.78 -2635.38 3744.32 5958294.12 695943.43 4576.04 13.48 MWb • by BP Alaska s Baker Hughes INTEQ Survey Report 1NTE Q Co®paey: BP Amoco Date: 12/5/2007 Timr. 15:23:11 Pace: 3 Field: Prudhoe Bay Co-ordiaate{NE) Reference: Wiell: 18-13, True Not1h Site: PB DS 18 Vertical (TVD) Reference: 18-13A 54.8 Weil: 18 -13 Scetioe (VS) Aeferenee: Well (O.pON,0. 00E,123.16Azi) WeBpath: 18-136 Survey Caknlation Method: Minimum Curvature Db: Orade Survey MD Incl Azim TVD Sys TVD N/S E/W MapN MapE VS DLS Toel ft deg deg ft ft ft ft ft ft ft deg/100ft 11170.52 89.36 118.05 8740.37 8685.57 -2649.89 3770.21 5958280.28 695969.67 4605.64 10.80 MWD 11204.32 90.46 108.71 8740.43 8685.63 -2663.29 3801.20 5958267.67 696000.99 4638.92 27.82 MWD 11234.19 88.83 108.14 8740.61 8685.81 -2672.73 3829.53 5958258.96 696029.56 4667.80 5.78 MWD 11264.63 87.33 105.27 8741.83 8686.83 -2681.48 3858.67 5958250.97 696058.91 4686.98 10.63 MWD 11294.20 88.62 102.63 8742.68 8687.88 -2688.60 3887.34 5958244.58 696087.76 4724.88 9.93 MWD 11332.09 86.54 97.23 8744.28 8689.48 -2695.12 3924.62 5958239.01 696125.18 4759.65 15.26 MWD 11360.93 86.22 96.65 8746.10 8691.30 -2698.60 3953.19 5958236.26 696153.83 4785.47 2.29 MWD 11390.61 87.42 91.70 8747.75 8692.95 -2700.76 3982.73 5958234.86 696183.42 4811.39 17.14 MWD 11421.32 87.33 90.99 8749.15 8694.35 -2701.48 4013.40 5958234.93 686214.10 4837.46 2.33 MWD 11453.71 87.14 88.31 8750.71 8695.91 -2701.28 4045.75 5958235.95 696246.43 4864.43 8.29 MWD 11486.06 89.32 92.95 8751.71 8696,91 -2701.64 4078.07 5958236.42 696278.75 4891.68 15.84 MWD 11507.87 90.18 94.16 8751.81 8697.01 -2702.99 4099.84 5958235.63 896300.54 4910.65 6.81 MWD 11550.00 90.18 94.16 8751.68 8696.88 -2706.05 4141.86 5958233.65 696342.62 4947.49 0.00 MWD i M by BP Alaska s Baker Hughes INTEQ Survey Report INTEQ Company: BP Amoco Date: 12!5/2007 Time. 15:58:13 Page: 1 Field: Pnudhoe Bay Co-ordiaate(NE) Referonce: Well: 18-13, T-ue North Site: PB DS 18 Vertical (TVD) Refereecr. 18-13A 54.8 Nell: 18-13 Section (VS) Rekrence: WeA (O.OON,O.OOE,126.93Azi) Welipath: 18-138PB1 Survey Caicnbrtien Method: Minimum Curvature Db: Orade Fkld: Prudhoe Bey North Slope UNITED STATES Map System: US State Plane Coordinate System 1927 Map Zone: Alaska, Zone 4 Geo Datum: NAD27 (Clarke 1866) Coordinate System: Well Centre Sys Datum: Mean Sea Level Geomageetk Model: bggm2007 Site: PB DS 18 TR-11-14 UNITED STATES :North Slope Site Position: Northing: 5959213.15 ft Lstitade: 70 17 35.252 N From: Map Easttag: 691583.44 ft Louaitade: 148 26 55.555 W Position Uneertainty: 0.00 ft North Reterrace: True Ground Level: 0.00 ft Grid Coavergeaee: 1.46 deg Well: 18-13 Slot Name: 13 18-13 Well Position: +N/-S 1605.17 ft Northing: 5980832.76 ft latitude: 70 17 51.039 N +E/-W 590.87 ft Fasting : 692133.18 ft Loegitnde: 148 26 38.331 W Positan Uncertainty: 0.00 ft Well~th: 18-13BP81 Drilled From: 18-13A 500292175672 Tie-on Depth: 9155.80 ft Current Datum: 18-13A Height 54.80 ft Above System Datum: Mean Sea Level Magnetic Data: 9/14/2007 Deednatiou: 23.72 deg Fteld Strength: 57667 uT Mag Dip Augk: 80.94 deg Vertical Section: Depth From (TVD) +N/-S +E/-W Direction ft ft ft deg 38.80 0.00 0.00 126.93 Survey Program for Definitive Weltpath Date: 11/6/2007 Validated: Yes Versioe: 5 Actual From To Survey Toolcode Tool Name ft ft 2706.80 9155.80 Survey #1 (2706.80-13045.00) ( MWD MWD -Standard 9202.00 10578.00 MWD (9202.00-70578.00) MWD MWD -Standard Auuotattoe MD TVD ft ft 9'155.80 8291.79 TIP 9202.00 8316.03 KOP 10578.00 8759.17 TD Survey: MWD Start Date: 11/13/2007 Company: Bakar Hughes INTEQ Eugiucer. Tool: MWD;MWD -Standard Tkd-to: From: Definitive Path Survey MD ft: tad deg Aaim deg TVD ft SysTVD N/S ft ft E/VV ft MapN ft MapE tt VS ft DLS Tooi deg/100ft 9155.80 57.40 133.00 8291.79 8236.99 -1807.90 2186.80 5959081.47 694365.35 2834.31 0.00 MWD 9202.00 59.30 133.00 8316.03 8261.23 -1834.72 2215.56 5959055.39 694394.79 2873.42 4.11 MWD 9231.57 56.00 131.30 8331.86 8277.06 -1851.48 2234.07 5959039.11 694413.72 2888.29 12.17 MWD 9260.53 52.20 129.60 8348.84 8294.04 -1866.71 2251.91 5959024.35 694431.94 2921.70 13.96 MWD 9290.97 48.37 127.90 8368.28 8313.48 -1881.37 2270.18 5959010.18 694450.56 2945.10 13.29 MWD 9321.14 44.75 126.20 8389.02 8334.22 -1894.57 2287.64 5958897.41 694488.37 2987.00 12.88 MIND 9350.54 40.07 124.51 8410.73 8355.93 -1906.05 2303.80 5958986.34 694484.81 2986.81 16.38 Mt/VD 9379.44 36.33 122.75 8433.43 8378.63 -1915.95 2318.67 5958978.82 694498.93 3004.65 13.48 MWIl 9409.83 31.54 123.53 8458.64 8403.84 -1925.22 2332.87 5958987.92 694514.37 3021.57 15.83 MWD 9440.32 27.49 122.01 8485.17 8430.37 -1933.36 2345.49 5958980,11 694527.19 3036.55 13.51 MWD 9469.90 30.19 118.11 SS11.08 8456.28 -1940.48 2357.84 5958953.30 894539.72 3050.71 11.12 MWD i ~ by BP Alaska Baker Hughes INTEQ Survey Report ~~r ~. .~. ~..,~ Sarvey MD ft 9501.10 9528.89 9559.98 9589.45 9608.09 9639.73 9672.94 9699.62 9730.21 9761.89 9791.15 9820.10 9849.90 9885.78 9918.38 9951.04 9978.82 10008.54 10038.97 10069.18 10101.55 10129.73 10160.29 10203.73 10220.91 10245.93 10276.20 10307.85 10332.88 10369.19 10399.93 10430.10 10459.72 10489.96 10521.49 10578.00 Incl deg 32.68 34.91 39.41 44.25 46.38 49.35 53.32 57.28 62.00 s7.a8 71.59 74.40 77.46 82.39 86.09 88.18 88.65 86.05 84.17 86.68 88.78 89.60 90.22 88.65 87.73 87.91 88.10 87.89 88.82 88.28 88.53 89.14 89.75 90.98 91.51 91.51 Azim TVD Sys TVD N!S FJW deg ft ft ft ft 113.61 8537.70 8482.90 -1947.56 2372.49 119.53 8560.80 8506.00 -1954.48 2386.28 122.87 8585.58 8530.78 -1964.23 2402.32 123.17 8607.53 8552.73 -1974.94 2418.80 123.68 8620.63 8565.83 -1982.24 2429.86 121.70 8641.86 8587.06 -1994.90 2449.61 117.73 8662.61 8607.81 -2007.73 2472.13 114.50 8677.80 8623.00 -2017.36 2491.82 112.05 8693.26 8638.46 -2027.78 2516.06 108.47 8706.82 8652.02 -2037.67 2542.91 104.71 8717.10 8662.30 -2045.47 2569.16 102.80 8725.57 8670.77 -2052.05 2596.04 106.65 8732.82 8678.02 -2059.40 2623.99 112.99 8739.10 8684.30 -2071.38 2657.19 118.74 8742.37 8687.57 -2085.53 2686.36 125.25 8744.00 8689.20 -2102.80 2714.00 130.07 8744.77 8689.97 -2119.77 2735.98 131.74 8746.15 8691.35 -2139.20 2758.42 133.44 8748.74 8693.94 -2159.72 2780.74 133.92 8751.15 8696.35 -2180.51 2802.51 133.37 8752.43 8697.63 -2202.84 2825.92 132.12 8752.83 8698.03 -2221.96 2846.61 130.92 8752.88 8698.08 -2242.22 2869.49 130.84 8753.31 8698.51 -2270.65 2902.33 129.88 8753.85 8699.05 -2281.77 2915.41 128.51 8754.80 8700.00 -2297.57 2934.79 125.11 8755.86 8701.06 -2315.69 2959.01 122.98 8756.86 8702.16 -2333.40 2985.22 121.03 8758.16 8703.36 -2346.65 3006.41 117.45 8759.78 8704.98 -2364.36 3038.06 114.95 8760.63 8705.83 -2377.93 3065.63 112.01 8761.25 8706.45 -2389.94 3093.29 110.35 8761.53 8706.73 -2400.64 3120.91 105.82 8761.34 8706.54 -2410.03 3149.65 103.74 8760.66 8705.86 -2418.07 3180.12 103.74 8759.17 8704.37 -2431.49 3235.00 MapN MapE ft ft 5958946.81 894554.54 5958940.04 894568.51 5958930.71 694584.79 5958920.42 694801.53 5958913.41 894612.77 5958901.25 694632.84 5958889.01 694655.68 5958879.88 694675.61 5958870.09 694700.11 5958860.89 694727.20 5958853.76 694753.63 5958847.87 694780.68 5958841.24 694808.80 5958830.11 694842.30 5958818.71 694871.81 5958800.15 894899.89 5958783.76 694922.29 5958764.90 694945.22 5958744.97 694968.05 5958724.73 694990.35 5958703.02 695014.32 5958684.43 695035.49 5958664.77 695058.88 5958637.19 695092.44 5958626.41 695105.80 5958611.11 695125.57 5958593.61 695150.24 5958578.58 695178.89 5958563.88 695198.42 5958548.98 895230.51 5958534.12 695258.42 5958522.82 695286.38 5958512.83 695314.26 5958504.18 695343.22 5958498.92 695373.89 5958484.91 695429.09 VS DLS Tool ft deg/100ft 3068.66 10.96 MWD 3081.85 14.30 MWD 3100.53 15.86 MWD 3120.13 16.44 MWD 3133.36 11.59 MWD 3156.75 10.47 MWD 3182.46 15.16 MWD 3204.00 17.87 MWD 3229.63 16.91 MWD 3257.03 19.54 MWD 3282.70 19.02 MWD 3308.15 11.58 MWD 3334.91 16.20 MWD 3368.65 22.16 MWD 3400.46 20.90 MWD 3432.94 20.91 MWD 3460.70 17.43 MWD 3490.31 10.39 MWD 3520.48 8.32 MWD 3550.38 8.46 MWD 3582.50 6.71 MWD 3610.53 5.30 MWD 3641.00 4.42 MWD 3684.33 3.62 MWD 3701.47 7.74 MWD 3726.45 5.52 MWD 3756.70 11.24 MWD 3788.29 6.78 MWD 3813.19 9.29 MWD 3849.13 10.86 MWD 3879.32 8.17 MWD 3908.66 9.95 MWD 3937.16 5.97 MWD 3965.77 15.52 MWD 3994.97 6.81 MWD 4046.89 0.00 MWD i • by BP Alaska s Baker Hughes INTEQ Survey Report 1NTE Q Company: BP Amoco Date: 12/5/2007 Thne: 15:59:01 Page: 1 Field: Prudhoe Bay Co-ordinate(NE) Reference WeA: 18-13, True North Site: PB DS 18 Verdeal (TVD) Reterrnce: 18-13A 54.8 Well: 18-13 SecHoe (VS) Reference: Well (O.OON,O.OOE,127.61Azi) WeUpath: 18-13BP62 Su-vey Caknlatien Method: Minimum Curvature I3b: Orade Field: Prudhoe Bay North Slope UNITED STATES Map System:US State Plane Coordinate System 1927 Map Zone: Alaska, Zone 4 Geo Datum: NAD27 (Clarke 1866) Coordinate System: Well Centre Sys Datum: Mean Sea Level Geomagnetic Model: bggm2007 Site: PB DS 18 TR-11-14 UNITED STATES :North Slope Site Position: Northing: 5959213.15 ft Latitude: 70 17 35.252 N From: Map Fasting: 691583.44 ft Longitude: 148 26 55.555 W Positba Uncertainty: 0.00 ft North Reference: True Ground Level: 0.00 ft Grid Convergence: 1.46 deg Well: 18-13 Slot Name: 13 18-13 Well Positioe: +N/-S 1605.17 ft Northing: 5960832.76 ft Latitude: 70 17 51.039 N +E/-W 590.87 ft Fasting : 692133.18 ft Longitude: 148 26 38.331 W Positon Uncertainty: 0.00 ft Wefipath: 18-136PB2 Drilled From: 18-13BPB1 500292175673 Tie-on Depth: 10220.91 ft Current Datum: 18-13A Height 54.80 ft Above System Datum: Mean Sea Level Magnetic Data: 11/13/2007 Declaration: 23.63 deg Field Strength: 57671 nT Mag Dip Argk: 80.94 deg Vertical SeMion: Depth From (TVD) +N/-S +E/-W Direction ft ft ft deg 38.80 0.00 0.00 127.61 Survey Program for Definitive Wellpath Date: 11/13/2007 Validated: Yes Version: 4 Actual From To Survey Tookode Tool Name ft ft 2706.80 9155.80 Survey #k1 (2706.80-13045.00) ( MWD MWD -Standard 9202.00 10220.91 MIND (9202.00-10578.00) (4) MWD MWD -Standard 10230.00 10500.00 MWD (10230.00-10500.00) MWD MWD -Standard Annotation MD 'f VD ft t 10220.91 8753.85 TIP 10230.00 8754.20 KOP 10500.00 8742.62 TD Servey: MWD Start Date: 11/16/2007 Company: Baker Hughes INTEQ Engineer: Toni: MWD;MWD -Standard Tied-to: From: Definitve Path a i • ~~ ~.. INTEQ by BP Alaska Baker Hughes INTEQ Survey Report Survey MD Incl Azim TVD Sys TYD N/S E/W MapN MapE VS DLS Tool ft deg deg. ft ft ft ft ft ft ft deg/100ft 10220.91 87.73 129.88 8753.85 8699.05 -2281.77 2915.41 5958626.41 695105.80 3702.07 0.00 MWD 10230.00 87.80 129.38 8754.20 8699.40 -2287.56 2922.41 5958620.80 695112.94 3711.14 5.55 MWD 10247.59 92.21 132.06 8754.20 8699.40 -2299.03 2935.74 5958609.67 695126.56 3728.70 29.34 MWD 10275.69 96.16 129.10 8752.15 8697.35 -2317.26 2957.01 5958591.99 695148.29 3756.68 17.55 MWD 10305.36 93.59 127.54 8749.63 8694.83 -2335.59 2980.21 5958574.27 695171.94 3786.24 10.12 MWD 10340.26 92.94 123.59 8747.64 8692.84 -2355.85 3008.54 5958554.74 695200.79 3821.05 11.45 MWD 10371.01 93.94 119.93 8745.80 8691.00 -2372.00 3034.64 5958539.26 695227.28 3851.58 12.32 MWD 10401.08 92.80 116.93 8744.03 8689.23 -2386.29 3061.03 5958525.65 695254.03 3881.21 10.66 MWD 10433.20 90.43 114.02 8743.12 8688.32 -2400.10 3090.01 5958512.59 695283.36 3912.59 11.68 MWD 10500.00 80.43 114.02 8742.62 8687.82 -2427.29 3151.03 5958486.97 695345.04 3977.52 .0.00 MWD ' • - by BP Alaska s Baker Hughes INTEQ Survey Report ><r,TE Q Compaey: BP Amoco Date: 12/5!2007 Time: 15:59:55 Pagr. 1 FieM: Prudhoe Bay Co-ordinate(NE) Refiermce: WeA: 1&13, True Nord Site: PB DS 18 Vertical (TVD) Reter+eaee: 18-13A 34.8 Weil: 18-13 - Sectiian (VS) Rekrrace: Well (O.OON,O.OOE,121.32Azi) Vt'ellpatb: 18-138P63 Sarvey Cakalatbn Method: Minimum Curvature Db: Orade Field: Prudhoe Bay North Sbpe UNITED STATES Map System:US Staff Plane Coordinate System 1927 Map Zone: Alaska, Zone 4 Gee Datum: NAD27 (Clarke 1866) Coordinate System: Web Centre Sys Datum: Mean Sea Level Gcomagnetk Model: bggm2007 Site: PB DS 18 TR-11-14 UNITED STATES :North Sbpe Site Position: Northing: 5959213.15 ft l.atitnde: 70 17 35.252 N From: Map Eastiag: 691583.44 ft Longitude: 148 26 55.555 W Positbn Uncertainty: 0.00 ft Nartb Reference: True Ground Level: 0.00 ft Grid Convergence: 1.48 deg WeN: 18-13 Sbt Name: 13 15-13 WeN Posilioa: +N/-S 1605.17 ft Nert6ing: 5960832.76 ft L.atitede: 70 17 51.039 N +E/-W 590.87 ft Fasting : 692133.18 ft Lorgrtnde: 148 26 38.331 W Petition Uneerta~ty: 0.00 ft Wellpat6: 18-136P63 Driikd From: 18-13BPB1 500292175674 Ttaon Depth: 9951.04 ft Carrent Datum: 18-13A Height 54.80 ft Above System Datam: Mean Sea Level Magnetic Data: 11/16/2007 DeeNuatron: 23.63 deg Field Strength: 57671 aT Mag Dip Angk: 80.94 deg Vertical Seaton: Depth From (TVD) +N/-S +E/-W Direetron ft ft ft deg 38.80 0.00 0.00 121.32 Survey Program for Definitive Wellpatb Date: 11/16/2007 Validated: Yes Version: 2 Aetna) From To Sarvey Toolcode Tool Name ft ft 2706.80 9155.80 Survey #1 (2706.80-13045.00) ( MWD MWD -Standard 9202.00 9951.04 MWD (9202.00-10578.00) (4) MWD MWD -Standard 9970.00 12152.00 MWD (9970.00-12152.00) MWD MWD -Standard Annotation MD ' `1`VD ft ft 9951.04 8744.00 TIP 9970.00 8744.55 KOP 12152.00 8749.76 TD Sarvey: MWD Start Date: 11/19/2007 Company: Baker Hughes INTEQ Engineer. Tool: MWD;MWD -Standard Tied-to: From: Definitive Path .'. by BP Alaska Baker Hughes INTEQ Survey Report >INTE Q Company: BP Amoco Date: 12/5@007 Time: 15:59:55 Pale: 2 Field: Pnidhoe Bay Co-ordinate(NE) Rcferescr. Well: 18-13, True North Site: PB DS 18 Vertical (TVD) Reference: 18-13A 54.8 WeN: 18-13 Seetbe (VS) Referencr. Well (O.OON,O .OOE,121.32Azi) Wellpatb: 18-136PB3 Survey Calculation Method: Minimum Curvature Db: orade Survey MD Ied Azim TVD Sys TVD N/S E/W MapN MapE VS DIS Toel ft deg. deg ft ft ft R ft ft ft deg/100ft 9951.04 88.18 125.25 8744.00 8689.20 -2102.80 2714.00 5958800.15 894899.89 3411.61 0.00 MWD 9970.00 88.50 128.54 8744.55 8689.75 -2114.18 2729.16 5958789.17 694915.33 3430.46 17.43 MWD 9994.71 93.13 124.43 8744.20 8689.40 -2128.86 2749.01 5958775.00 894935.55 3455.06 25.05 MWD 10025.76 91.75 121.19 8742.88 8688.08 -2145.67 2775.08 5958758.86 694962.04 3486.07 11.33 MWD 10054.89 90.34 117.16 8742.35 8687.55 -2159.87 28011.51 5958745.32 694987.82 3515.18 14.65 MWO 10087.53 89.57 113.63 8742.37 8687.57 -2173.86 2829.99 5958732.09 695017.65 3547.62 11.07 MWD 10110.39 88.00 109.81 8742.86 8688.06 -2182.32 2831.21 5958724.18 695039.08 3570.15 18.06 MWD 10135.43 88.22 108.32 8743.69 8688.89 -2190.49 2874.87 5958716.61 695062.94 3594.61 6.01 MWD 10165.45 89.02 111.36 8744.41 8689.61 -2200.68 2903.09 5958707.15 695091.41 3624.02 10.47 MWD 10196.07 90.21 115.01 8744.61 8689.81 -2212.73 2931.24 5958695.82 895119.85 3654.32 12.54 MWD 10225.35 90.49 118.56 8744.44 8689.64 -2225.92 2957.37 5958683.30 695146.31 3683.50 12.16 MWD 10250.20 90.68 121.53 8744.18 8689.38 -2238.36 2978.88 5958671.42 695168.13 3708.34 11.98 MWD 10280.23 90.18 125.66 8743.96 8689.16 -2254.97 3003.88 5958655.45 695193.55 3738.34 13.85 MWD 10310.79 89.48 128.70 8744.05 8689.25 -2273.44 3028.23 5958637.62 695218.36 3768.74 10.21 MWD 10358.46 90.37 130.50 8744.11 8689.31 -2303.82 3064.96 5958808.18 695255.85 3815.91 4.21 MWD 10397.54 91.63 125.97 8743.43 8688.63 -2328.00 3095.64 5958584.80 695287.14 3854.69 12.03 MWD 10427.62 91.01 123.08 8742.73 8687.93 -2345.04 3120.41 5958568.40 695312.34 3884.71 9.82 MWD 10458.21 90.06 119.65 8742.45 8687.65 -2360.96 3146.53 5958553.15 695338.85 3915.30 11.63 MWD 10498.39 89.26 115.19 8742.69 8687.89 -2379.46 3182.18 5958535.57 685374.97 3955.37 11.28 MWD 10528.95 89.26 112.66 8743.08 8688.28 -2391.85 3210.11 5958523.90 695403.20 3985.67 8.28 MWD 10558.45 89.85 109.68 8743.31 8688.51 -2402.50 3237.62 5958513.96 695430.97 4014.71 10.30 MWD 10588.86 89.54 103.72 8743.47 8688.67 -2411.24 3266.73 5958505.97 695460.29 4044.12 19.63 MWD 10629.22 90.09 100.36 8743.60 8688.80 -2419.65 3306.20 5958498.56 695499.96 4082.21 8.44 MWD 10664.12 91.29 96.87 8743.18 8688.38 -2424.88 3340.70 5958494.22 695534.58 4114.39 10.57 MWD 10694.52 90.09 93.65 8742.82 8688.02 -2427.67 3370.96 5958492.21 695564.90 4141.70 11.30 MWD 10726.21 89.29 96.80 8742.99 8688.19 -2430.55 3402.52 5958490.13 695596.52 4170.15 10.26 MWD 10755.87 90.46 102.08 8743.05 8688.25 -2435.41 3431.76 5958486.02 695625.88 4197.66 18.23 MWD 10785.17 88.74 105.47 8743.26 8688.46 -2442.39 3480.21 5958479.77 695654.50 4225.58 12.97 MWD 10816.84 87.88 109.17 8744.19 8689.39 -2451.81 3490.43 5958471.13 695684.94 4256.30 11.99 MWD 10845.47 86.96 111.77 8745.48 8690.68 -2461.81 3517.22 5958461.82 695711.98 4284.39 9.62 MWD 10875.61 88.71 115.03 8746.62 8891.82 -2473.77 3544.86 5958450.57 695739.91 4314.22 12.27 MWD 10905.55 89.91 118.70 8746.98 8692.18 -2487.30 3571.56 5958437.73 695786.95 4344.08 12.90 MWD 10937.89 89.88 122.69 8747.04 8692.24 -2503.80 3599.36 5958421.94 695795.16 4376.38 12.34 MWD 10988.75 89.48 126.04 8747.21 5692.41 -2521.22 3624.83 5958405.18 695821.07 4407.20 10.93 MWD 10999.16 90.31 128.67 8747.27 8692.47 -2539.67 3649.00 5958387.36 695845.70 4437.44 9.07 MWD 11029.59 89.72 124.50 8747.26 8692.46 -2557.80 3673.43 5958369.88 695870.58 4467.74 13.84 MWD 11062.49 89.17 121.15 8747.58 8692.78 -2575.63 3701.07 5958352.74 695898.67 4500.62 10.32 MWD 11092.23 89.23 117.34 8747.99 8693.19 -2590.16 3727.02 5958338.88 695924.97 4530.33 12.81 MWD 11122.37 89.08 112.91 8748.44 8693.64 -2602.95 3754.29 5958328.79 695952.57 4560.28 14.70 MWD 11152.64 90.09 109.27 8748.66 8693.86 -2613.84 3782.53 5958316.63 695981.07 4590.06 12.48 MWD 11182.41 90.43 107.83 8748.52 8693.72 -2823.31 3810.75 5958307.88 896009.53 4619.10 4.97 MWD 11212.45 90.00 103.50 8748.41 8693.61 -2831.42 3839.67 5958300.52 696038.84 4648.02 14.48 MWO 11242.24 91.01 100.55 8748.15 8693.35 -2837.63 3868.80 5958295.08 696067.92 4676.13 10.47 MWD 11272.61 91.81 97.31 8747.40 8892.60 -2642.34 3898.79 5958291.11 688098.02 4704.19 10.99 MWD 11308.71 91.81 93.14 8746.26 8691.46 -2645.62 3934.71 5958288.75 696134.01 4736.59 11.55 MWD 11340.50 90.25 90.44 8745.69 8890.89 -2846.82 3868.48 5958288.57 698185.79 4764.24 9.81 MWD 11370.81 89.69 88.33 8745.70 8690.90 -2646.29 3996.59 5958289.66 896195.88 4789.79 7.25 MWD 11400.98 90.06 93.02 8745.77 8690.97 -2646.65 4026.95 5958290.08 698228.23 4815.91 15.49 MWp 11431.22 89.60 97.14 8745.86 8691.06 -2849.33 4057.06 5958288.17 698256.40 4843.03 13.71 MWD 11460.81 88.65 101.39 8746.31 8691.51 -2654.09 4086.25 5958284.18 698285.71 4870.44 14.72 MWD 11494.78 88.92 106.14 8747.03 8692.23 -2662.17 4119.23 5958278.93 698318.88 .4902.81 14..00 MWD 11519.93 88.99 109.80 8747.49 8692.69 -2669.88 4143.18 5958269.83 896343.00 4927.27 13.76 MWD 11550.64 89.26 112.84 8747.96 8693.16 -2881.00 4171.78 5958259.45 698371.89 4957.49 10.59 MWD i~ . ~.r ~s u _~,~ SUR'C}' MD Iocl Azim TVD Sys TVD N/S E/W ft deg deg ft ft ft it 11580.46 89.72 117.58 8748.23 8693.43 -2683.69 4198.75 11610.88 88.59 121.17 8748.67 8693.87 -2708.61 4225.25 11640.34 88.77 124.57 8749.35 8694.55 -2724.59 4249.99 11669.21 89.11 129.17 8749.89 8695.09 -2741.91 4273.07 11699.21 88.50 132.66 8750.51 8695.71 -2761.55 4295.73 11732.07 88.34 125.84 8751.42 8696.62 -2782.32 4321.16 11764.30 88.34 120.67 8752.35 8697.55 -2799.98 4348.09 11796.64 90.00 115.28 8752.82 8698.02 -2815.14 4376.63 11829.40 88.44 108.09 8753.27 8698.47 -2827.24 4407.05 11855.50 90.18 105.92 8753.58 8698.78 -2834.87 4432.01 11887.43 93.56 101.74 8752.54 8697.74 -2842.50 4462.98 11917.60 94.49 95.63 8750.42 8695.62 -2847.04 4492.72 11847.36 94.27 93.49 8748.15 8693.35 -2849.40 4522.30 11979.02 93.81 88.37 8745.92 8691.12 -2849.91 4553.86 12010.64 91.81 91.47 8744.37 8689.57 -2849.87 4585.44 12040.89 88.01 95.33 8744.41 8689.61 -2851.68 4615.62 12073.83 86.59 99.49 8745.97 8691.17 -2855.90 4648.25 12103.11 87.36 105.06 8747.51 8692.71 -2862.12 4676.80 12152.00 87.36 105.06 8749.76 8694.96 -2874.81 4723.97 Mapi~i MapE ft ft 5958247.45 696399.17 5958233.21 696426.05 5958217.87 696451.18 5958201.15 698474.70 5958182.10 696497.85 5958161.98 696523.80 5958145.02 696551.17 5958130.59 696580.09 5958119.28 696610.81 5958112.29 696635.95 5958105.46 696667.11 5958101.68 696696.95 5958100.07 696726.57 5958100.37 696758.14 5958101.22 696789.71 5958100.20 696819.92 5958096.79 696852.64 5958091.31 696881.35 5958079.83 696928.82 VS DL5 Tool ft degl100ft 4987.13 15.97 MWD 5017.53 12.37 MWD 5046.96 11.55 MWD 5075.69 15.97 MWD 5105.26 11.81 MWD 5137.77 20.75 MWD 5169.96 16.03 MWD 5202.23 17.44 MWD 5234.50 22.46 MWD 5259.78 10.66 MWD 5290.21 16.83 MWD 5317.97 20.44 MWD 5344.47 7.21 MWD 5371.70 16.20 MWD 5398.65 11.66 MWD 5425.37 17.90 MWD 5455.44 13.33 MWD 5483.07 19.18 MWD 5529.95 0.00 MWD by BP Alaska Baker Hughes INTEQ Survey Report r TT2F~`= 41 /16" FMC ~ELLHEAD= ACTUATOR = FMC BAKER C KB. ELEV = BF. ELEV = 54.8' -- KOP = 3450' Max Angle = -------- Datum MD = 94 ~ 11073' ------- N/A Datum TVD = 8800' SS 18 -13 B (9 ~ ,"°BES:W~L~uuc~E> 70~ ~ 9825' ~ > DRLG DRAFT ~~~~~ .G, 68#, K-55 /72#, L-80, ID = 12.347" ~ 4486 Minimum ID = 3.813" ~ 2208' 4-1 /2" CAMCO BAL-0 SSSVN 4112" TBG, 12.6#, L-80, .0152 bpf, ID = 3.958" TOP OF BKR TEBACK SLV, ID = 7.500" 9-5/8" X 7" BKR HMC HGR, D = 6.250" TOP OF TNV T1~A CK SLV 9-518" X 7" TNVLNR HGR I 41/2" CAMCO BAL-O SSSVN, ID= 3.813" I GAS LIFT MANDRELS ST MD TVD DEV TYPE VLV LTCH PORT DATE 3 3009 3008 6 MMG DMY RK 0 10/23/07 2 6225 6009 25 MMG DMY RK 0 10!13/07 1 8479 7902 55 MMG DMY RK 0 10/13/07 g5~8, 9-5/8" X 41/2" BKR S-3 PKR, ID = 3.875" 8696" -i 4112" HES X NIP, ID = 3.813" $70$' 9-5/8" X 7" BKR ZXP PKR, ®= 6.313" 8718 4112" WLEG, ID = 3.958" 1 $720' 7" X 41/7' LNR XO, ~ = 3.958" 8805' I 9-5/8" CSG, 47#, L-80, ~ = 8.681 " H 9103' 7" LNR, 29#, L-80, ID = 6.184" 1027T 7" LNR MILLOUT WMIDOW 974T - 9759' (OFF 1M-I~STOCK) PERFORATION SUMMARY REF LOG: SPERRY MWD RESISTIVITY/GR 02/15/98 A NGLE AT TOP PERF: 88 ~ 11450' Note: Refer to Roduction DB for historical pert data SQE SPF INTERVAL OpNSgz DATE 2-314" 4 11450 - 11620 C 02/20/98 2-3/4" 4 11690 - 12005 C 02/20/98 2-314" 4 12055 - 12230 C 02/20/98 2-3/4" 4 1 n75 - 12385 C 04/17/04 2-3/4" 4 12405 - 12930 C 04/17/04 2-3/4" 4 12955 - 12995 C Q4/17/04 2" 6 10160 - 10310 O 12/07: C 2" 6 10580 - 11510 O 1 Z/07rt. 3.687" BKR N CIBP 13000' PBTD 13001' 4112" LNR, 12.6#, L-80, .0152 bpf, ID = 3.958" 13097" O -~ 8571' Top of KB Packer 10 2.56" 8594' TOL 3.7" OD 3.00" ~ 8604' Otis "X" Nippk; Q ~ ^ 9200' Mechanical w hipstock ~,~ 7 C.VZ~ 9225' 41 /2" HES X NIP, ~ = 3.813" r 1509 ft ft PBTD 11545.5 ft ~Sj10~ ~~ 1~~~ 9233 ft Top of w hipstock fish 0609' 4112" HES X Nom, ~ = 3.813" 11345" I-~ 41 /2" MLA S .fT DATE REV BY COMMENTS DATE REV BY COMMENTS 12!07/87 ORIGINAL COMPLETION 02/25198 RIG SIDETRACK 10/14107 016 RWO 12/09107 Nordic2 CTD SIDETRACK PRUDHOE BAY UNff WELL: 18-13A PERMrr No: t s7n3o API No: 50-029-21756-01 SEC 19, T11 N, R15E, 1045 SNL 8 371' EWL BP Exploration (Alaska) • '_,i BAI(ER NU6HE5 INTEQ To Whom It May Concern: 7260 Homer Drive Anchorage, Alaska 99518 Te1907-267-6600 Fax 907-267-6623 January 18, 2008 Please find enclosed directional survey data for the following wells: 18-13BPB1 ~ 18-13BPB2 `~ 18-13BPB3 18-13B K-14A H-24A~'~, 15-04BPB 1 15-04B Enclosed for each well is: tea copies of directional survey reports 1 ea 3.5" floppy diskette containing electronic survey files Please sign and return one copy of this transmittal form to: BP Exploration(Alaska)Inc. Petrotechnical Data Center, LR2-1 900 E. Benson Blvd. Anchorage, Alaska 99508 to acknowledge receipt of this data. RECEIVED BY: lJ °~J"W ~ ,State of Alaska AOGCC DATE: 1 t~ a m~. ~1 Cc: State of Alaska, AOGCC ~~-i~4~ ~ ~ STATE OF ALASKA 11/13/07 O IL AND GAS CONSERVATION COMMISSION BOPS Test Report Submit to: Contractor: Nordic R~ No.: 2 DATE: 12/8!07 Rig Rep.: Sloan / Holmes Rig Phone: 659-4398 Rig Fax: 659-4356 Operator: BPX Op_ Phone: 659-4393 Op. Fax: 659-4356 Rep.: Hildreth /Goodrich E-Mail Well Name: DS 18-136 PTD # ~?"•1liT Operation: Drlg: XX Workover Explor.: Test: Initial: Weekly: Bi-Weekly XX Test Pressure: Rams: 250/3500 Annular: 250/3500 Valves: 250/3500 MISC. INSPECTIONS: TEST DATA FLOOR SAFETY VALVES: Test Result Test Result Quantity Test Result Location Gen.: P Weit Sign P Upper Kelly NA Housekeeping: P Dr1. Rig P Lower Kelly NA PTD On Location P Hazard Sec. P Ball Type 1 P Standing Order Posted P Inside BOP NA BOP STACK: Quantity Size/Type Test Result MUD SYSTEM: Visual Alarm Stripper 1 23/8" P Trip Tank P P Annular Preventer 1 71116" P Pit Level Indicators P P #1 Rams 1 Blind/Shear P Flow Indicator NA NA #2 Rams 1 2 318" Combi P Meth Gas Detector P P #3 Rams 1 2 318"x3112" P H2S Gas Detector P P #4 Rams 1 2318" Combi P #5 Rams NA Quantify Test Result Choke Ln. Valves 1 3118" P Inside Reel valves 1 P HCR Valves 2 3118" P Kill Line Valves 1 3 118" P ACCUMULATOR SYSTEM: Check Valve 2 21116" P Time/Pressure Test Result System Pressure 3000 P CHOKE MANIFOLD: Pressure After Gtosure 2100 P Quantity Test Result 200 psi Attained 28 sec. P No. Valves 14 P Fult Pressure Attained 102 sec. P Manual Chokes 1 P Blirxl Switch Covers: All stations Yes Hydraulic Chokes 1 P Nitgn. Bottles (avg}: 4 2100 Test Results Number of Failures: 0 Test Time: 4 Hou Comoonents tested 30 Repair or replacement of equipment will be made within NA days. Notify the North Slope Inspector 659-3607, follow with writfen ctmftrmation to Superviser at: Remarks: 24 HOUR NOTICE GIVEN YES XX NO Waived By L. Grimaldi Date 1217107 Time 1400 tartness Goodrich /Hildreth Test start 03:00 Finish 07:00 BOP Coil far Rigs BFL 11/13/07 Nordic 2 BOP 12-8-07.x1s r r~ STATE OF ALASKA 11/13/07 OIL AND GAS CONSERVATION COMMISSION BO PE Test Report Submit to: Contractor: Nordic Rig No.: 2 DATE: 11!23/07 Rig Rep.: MckeimaNPederson Rig Phone: 6584398 Rig Fax: 659-4356 Operator: BPX Op. Phone: 658-4393 Op. Fax: 659-4356 Rep.: Sevcik/Ross E-Mail __ WeN Name: DS 18-13B PTD # 207-157 Operation: Drlg: XX Woricover: Exptor.: Test: tnitiaf: Weekly: Bi-Weekly XX Test Pressure: Rams: 25013500 Annular: 250!3500 Valves: 250!3500 MISC. INSPECTIONS: TEST DATA FLOOR SAFETY VALVES: Test Result Test Result Quantity Test Result Location Gen.: P Weii Sign P Upper Kelly NA Housekeeping: P DrI, Rig P Lower Kelly NA PTD On Location P Hazard Sec. P Bali Type 2 P Standing Order Posted P Inside BOP NA BOP STACK: Quantity Size/Type Test Result MUD SYSTEM: Visual Alarm Stripper 1 2 318" P Trip Tank P P Annular Preventer 1 7 1116" P Pit Level Etxlicators P P #1 Rams 1 BlindlShear P Flow indicator P P #2 Rams 1 2 318" Comte P Meth Gas Detector P P #3 Rams 1 23!8"x3112" P H2S Gas Detector P P #4 Rams 1 2318" Combi P #5 Rams NA Quantity Test Result Choke Ln. Valves 1 3118" P inside Reel vafves 1 P HCR Valves 2 31f8" P Kill Line Valves 1 3 118" P ACCUMULATOR SYSTEM: Check Valve 2 21116" P Time/Pressure Test Result System Pressure 3000 P CHOKE MANIFOLD: Pressure After Closure 2300 P Quantity Test Result 200 psi Attained 19 sec. P No. Valves 14 P Fu8 Pressure Attained 69 sec. P Manual Chokes 1 P Blind Switch Covers: All stations Yes Hydraulic Chokes i P Nitgn. Bottles (avg}: 4 2150 Test Results Number of Failures: 0 Test Time: 4112 Hours Components tested 31 Repair or replacement of equipment will f~ made within NA days. Notify the N orth Slope Inspector 659-3607, follow with written confirmation to Su~rviser at: _ Remarks: 24 HOUR NOTICE GIVEN YES NO a~UC Waived By John Crisp Date 11123/07 Time 0900 Witness Test start 1300 Finish 1730 BOP Coif for Rigs BFL 11113/07 Nordic 2 BOP 11-23-07.x1s l~ • STATE OF ALASKA 11!13/07 OIL AND GAS GONSERVATION COMMISSION ROPE Test Repc,rt Submit to: Contractor. Nordic Rig No_: 2 DATE: 11/13/07 Rig Rep.: Holmes/SCoan Rig Phone: 659-4398 Rut Fax: 659-4356 Operator: BPX Op. Phone: 659-4393 Op. Fax: 659-4356 Rep.: Hildreth/Goodrich E-Mail Well Name: DS 18-13B PTD ~ ~. Operation: Drlg: XX Workover: Explor.: Test: Initial: Weekly: Bi-Weekly XX Test Pressure: Rams: 250135EI0 Annular: 2501350E1 Valves: 250/3500 MISC. INSPECTIONS: TEST DATA FLOOR SAFETY VALVES: Test Result Test Result Quantity Test Result Location Gen.: P Weli Sign P Upper Kelly NA Housekeeping: P Drl. Rig P Lower Keay NA PTD On Location P Hazard Sec. P Baf! Types 2 P Standing Order Pasted P Inside BOP NA BOP STACK: Quantity SizelType Test Result MUD SYSTEM: Visual Alarm Stripper 1 2 3J8" P Trip Tank P P Annular Preventer 1 71N6" P Pit Level Indicators P P #1 Rams 1 Biind/Shear _ P Flow Indicator NA NA #2 Rams 1 2 318" Combi P Meta Gas Detector P P #3 Rams 1 23/8"x3112" P H2S Gas D~etedor F P #4 Rams 1 23!8" Comt>; P #5 Rams NA Quantity Test Result Choke Ln. Values 1 _ _ 31/8" P Inside Reel valves 1 P HCR Valves 2 3118" P Kill Line Valves i 3118" P ACCUMULATOR SYSTEM: Check Valve 2 2 1f16" P Time/Pressure Test Result System Pressure 3000 P CHOKE MANIFOLD: Pressure After Closure 2100 P Quantity Test Result 20() psi Attained 13 sec. P No. Valves 14 P Full Pressure Attained 90 sec. P Manual Chokes 1 P Blind Switch Covers: All stations Yes Hydraulic Chokes 1 P Nitgn. Bottles (avg}: 4 2125 Test Results Numtber of Failures: Q Test Time: 5 [-tours Components tested 31 Repair or replacement of equipment will tje made within NA days. Notify the North Slope Inspector 659-3607, follow with written confirmation to Sup~rviser at: Remarks: 24 HOUR NOTICE GIVEN YES )(X NO Waived By L. Grimaldi Date 11111!07 Time 1400 Witness G. Goodrich Test start 1100 Finish 1600 BOP Coil for Rigs BFL 11/13/07 Nordic 2 BOP 11-13-07.x1s LJ ~~ ou~~ I~ 'uir ;~~~~R~'~{;„1 ALASSA OIL AHI1 GAS CO1~T5ERQA'1`IO1~T CODIl~i15SIO1~T Lamar Gantt CT Drilling Engineer BP Exploration Alaska, Inc. PO Box 196612 Anchorage, AK 99519-6612 SARAH PAL/N, GOVERNOR 333 W. 7th AVENUE, SUITE 100 ANCHORAGE, ALASKA 99501-3539 PHONE (907) 279-1433 FAX (907) 276-7542 Re: Prudhoe Bay Field, Prudhoe Bay Oil Pool, PBU 18-13B BP Exploration Alaska, Inc. Permit No: 207-157 Surface Location: 1045' FNL, 371' FWL, SEC. 19, T11, R15E, UM Bottomhole Location: 4156' FNL, 583' FWL, SEC. 20, T11N, R15E, UM Dear Mr. Gantt: Enclosed is the approved application for permit to redrill the above referenced development well. This permit supercedes that of 18-13AL 1, Permit No 207-134. Due to the loss of mechanical equipment in hole, 18-13AL1 cannot be drilled. Beginning operations on 18-13B prior to receipt of this permit was authorized by commissioner Seamount on November 6, 2007 per 20 AAC 25.005. This permit to drill does not exempt you from obtaining additional .permits or an approval required by law from other governmental agencies and does not authorize conducting drilling operations until all other required permits and approvals have been issued. In addition, the Commission reserves the right to withdraw the permit in the event it was erroneously issued. Operations must be conducted in accordance with AS 31.05 and Title 20, Chapter 25 of the Alaska Administrative Code unless the Commission specifically authorizes a variance. Failure to comply with an applicable provision of AS 31.05, Title 20, Chapter 25 of the Alaska Administrative Code, or a Commission order, or the terms and conditions of this permit may result in the revocation or suspension of the permit. When providing notice for a representative of the o mission to witness any required test, contact the Commission's petroleum field ' spe or at (907) 659-3607 (pager). DATED this ,day of November, 2007 cc: Department of Fish 8v Game, Habitat Section w/ o encl. Department of Environmental Conservation w/ o encl. STATE OF ALASKA ~~~ ~~ ALAS~IL AND GAS CONSERVATION COMMI N NOV ~ $ ~og7 PERMI~T~ OoDRILL ~~~ Alaska Q+1 & ~~,s tans Comm+sson n.,~hnrftlB 1 a. Type of work ^ Drill ®Redrill ^ Re-Entry 1 b. Current Well Class ^ Exploratory ^ Development Gas ^ Service ^ Multiple Zone ^ Stratigraphic Test ®Development Oil ^ Single Zone 1 c. Specify if well is proposed for: ^ Coalbed Methane ^ Gas Hydrates ^ Shale Gas 2. Operator Name: BP Exploration (Alaska) Inc. 5. Bond: ®Blanket ^ Single Well Bond No. 6194193 11. Well Name and Number: PBU 18-136 3. Address: P.O. Box 196612, Anchorage, Alaska 99519-6612 6. Proposed Depth: MD 12700 TVD 8700ss 12. Field /Pool(s): Prudhoe Bay Field / Prudhoe Bay 4a. Location of Well (Governmental Section): Surface: EC 19 T11N R1 UM ' ' E 7. Property Designation: ADL 028321 Pool , 1045 FNL, 371 FWL, S . , 5 , Top of Productive Horizon: 3594' FNL, 3568' FWL, SEC. 19, T11 N, R15E, UM 8. Land Use Permit: 13. Approximate Spud Date: Immediately (Reed Verbal Appr) Total Depth: 4156' FNL, 583' FWL, SEC. 20, T11N, R15E, UM 9. Acres in Property: 2560 14. Distance to Nearest Property: 31,300' 4b. Location of Well (State Base Plane Coordinates): Surface: x-692133 y-5960832 Zone-ASP4 10. KB Elevation (Height above GL): 54.8' feet 15. Distance to Nearest Well Within Pool: 7~' 16. Deviated Wells: Kickoff Depth: g20p feet Maximum Hole An le: 90 de rees 17. Maximum Anticipated Pressures in psig (see 20 AAC 25.035) Downhole: 3318 Surface: 2438 18. Casin Pr ram: S e ' icatio n To - Settin De th -Bo ttom uanti of Cement c.f. or sacks Hole Casin Wei ht Grade Cou lin Len th MD TVD MD TVD includin sta a data 4-1 /8" s-vz~~ x 33!16" 9.3# / 6.2# L-80 STL / TCI I 4100' 8600' 7915' 12700' 8700' 189 sx Class 'G' x 2-7/8" ! 6.16# 1 g. PRESE NT WELL CONDITION SUMMARY (To be completed forRedrill and Re-entry Operations) Total Depth MD (ft): 13102 Total Depth TVD (ft): 8772 Plugs (measured): None Effective Depth MD (ft): 13000 Effective Depth TVD (ft): 8771 Junk (measured): 9234 asing : Length Size Cement Volume: MD TVD Conductor /Structural Surface 110' 20" 1694 # Poleset 110' 110' Intermediate 4482' 13-3/8" 3500 sx CS III, 600 sx'G', To Job: 100 sx CS II 4482' 4429' Production 9103' 9-5/8" 930 sx Class'G' 9103' 82 3' Liner 942' 7" 500 sx Class'G' 8805' - 9747' 8087' - 8532' Liner 4399' 4-1/2" 523 sx Class 'G' 8698' - 13097' 8025' - 8772' Perforation Depth MD (ft): 11450' - 12995' Perforation Depth TVD (ft): 8766' - 8771' 20. Attachments ^ Filing Fee, $100 ®BOP Sketch ®Drilling Program ^ Time vs Depth Plot ^ Shallow Hazard Analysis ^ Property Plat ^ Diverter Sketch ^ Seabed Report ®Drilling Fluid Program ®20 AAC 25.050 Requirements 21. Verbal Approval Commission Representative: ~i1~1/~~iy0~(//YT Date:/- 22. I hereby certify that the foregoing is true and correct. Contact Lamar Gantt, 564-5593 Printed Name Lamar Gantt Title CT Drilling Engineer Abby Higbie, 564-5480 - Prepared By Name/Number: ~" ~ ~~ ~ ~ Terrie Hubble, 564-4628 Si nature ~ ~ ~ . s~'~ , Phone 564-5593 Date ~/ c_ c°'1 v Commission Use Onl Permit To Drill Number:®?D~1~S70 API Number: 50-02921756-02-00 Permit Ap oval Date: I l See cover letter for other re uirem nts Conditions of Approval: ,~( If box is checked, well may not be used to explore for, test, or produce coalbed methane, gas hydrates, or gas contained shales: vI~J/ Samples Req'd: ~ Yes ~ No Mud Log Req'd: ^,Yes Ib No HZS Measures: Y N D rectional Survey Req'd: ~ Yes ^ No Other: 35C~C9 p9. +~~, v~,r.,~v•r..'C~d~P ~s"~_ ~~ APPROVED BY THE COMMISSION Date ~ ,COMMISSIONER Form 10-401 Revised 12/2005 p R t G I N ~L ~/ ~ Submit In Duplicate ~~ BP Prudhoe Bay 18-13B CTD Side~ck 18-13B CTD Sidetrack Summary This Permit to drill for 18-136 is submitted due to an unsuccessful CTD drilling operation on the proposed 18-13 AL1 sidetrack. In the process of running the whipstock for 18-13 AL1, the whipstock became stuck at roughly 8800'. Fishing operations were unsuccessful, so the fish was pushed downhole to an X nipple at 9234, at which point it became permanently stuck. This requires a change in scope of the CTD sidetrack proposal. Verbal approval was received from the State (reference attached a-mail from Art Saltmarsh dated 10/6/2007) to pursue a new permit to drill for 18-13B. Rig Operations: Nordic 2 rigged up on the 18-13 A wellbore on 10/30/07 under Permit to Drill #207-134 for PBU 18-13 AL1 Verbal approval received from AOGCC (ref: Art Saltmarsh Email 11/06/07) to change the drilling plan and BHL Scope revised to drill the proposed PBU 18-136 as follows: 3~1~_ '3 L~t~ Point forward Rig Work: (as of 10/6/2007) -rig currently on location 1) Perform cleanout runs and dummy whipstock run to 9200 ft 2) Set 4-1/2" Baker Monobore WS at 9200' 3) Drill Build: 4.125" OH, 730' (15 deg/100 planned) 4) Drill Lateral: 4.125" OH, 2770' (12 deg/100 planned) 5) Run 3-3/16" X 2-7/8" solid liner targeting TOL at 8600' 6) Pump primary cement job to TOL, 39 bbl of 15.8 ppg cmt planned 7) Run cleanout assembly 8) Run MCNL/GR/CCL log 9) Test liner lap to 2000 psi. 10) Perforate, planned 1500ft. 11) Freeze protect well with diesel, set BPV, and RDMO Post-Rig Work: 1) Pull BPV 2) Install well house, flow line, and gas lift valves Mud Program: • Well kill: 8.6 ppg brine • Milling/drilling: 8.6 ppg Flo Pro or biozan for milling, new Flo Pro for drilling. Disposal: • All drilling and completion fluids and all other Class II wastes will go to Grind & Inject. • All Class I wastes will go to Pad 3 for disposal. Hole Size: • 4.125" Completion Design: Cemented and perforated liner • 3-1/2", L-80 9.3# STL 8600' md- 9200' and • 3-3/16", L-80 6.2# TCII 9200' and - 10100' and • 2-7/8", L-80 6.16# STL 10100'md - 12700'md • A minimum of 39 bbls 15.8 ppg cement will be used for liner cementing. TOC planned at 8600' Well Control: • BOP diagram is attached. • Pipe rams, blind rams and the CT pack off will be pressure tested to 250 psi and to 3500 psi. • The annular preventer will be tested to 250 psi and 2500 psi. Directional • See attached directional plan. Max. planned hole angle is 90 deg. • Magnetic and inclination surveys will be taken every 30 ft. No gyro will be run. • Distance to nearest property - 31,300 ft. • Distance to nearest well within pool -754 ft. (18-30) Anti-collision Summary • 18-13A - 18-13 B is exiting and paralleling the 18-13A wellbore with 163 ft closest approach after initial deviation from wellpath • 18-13,PB2 - abandoned wellbores • 18-15B - 315' ctr-ctr, Status: currently shut-in to address surface facility issues • 18-12A - 621' ctr-ctr, Status: cycle well currently on off cycle • 18-21 A - 571' ctr-ctr, Status: Offline to address leaking tbg patch Logging • MWD directional, and gamma ray will be run over the open hole section. Hazards • The maximum recorded H2S level on Drill Site 18 is 20 ppm (18-14B on 5/11/2007). • Lost circulation risk is LOW Reservoir Pressure • Res. press. is estimated to be 3318 psi at 8800' TVDss (7.25 ppg EMW). j~ Max. surface pressure with gas (0.10 psi/ft) to surface is 2438 psi. Lama~~~a tt~' ~ ~'~~ ` L LG. CTD Engineer CC: Well File Sondra Stewman/Terrie Hubble TREE= 4-1/16" FAAC WELLHEAD= FMC ACTUATOR= BAKERC KB. ELEV = 54.8' BF. ELEV = KOP = 3450' Max Angle = 94 @ 12441' Datum MD = WA Datum TV D = 8800' SS 113-3/8" CSG, 68#, K-55 /72#, L-80, ID = 12.347" I Minimum ID = 3.813" @ 2208' 4-1/~"" CAMCO BAL-O SSSVN 4-1/2" TBG, 12.6#, L-80, .0152 bpf, ID = 3.958" TOP OF BKR TIEBACK SLV, ID = 7.500" 9-5/8" X 7" BKR HMC HGR, ID = 6.250" TOP OF TNV TIEBACK SLV 9-5/8" X 7" TNV LNR HGR I 9-5/8" CSG. 47#, L-80, ID = 8.681" I I 8815' I 4~hi pslo-K fist' i~ 9234' ~• 7" LNR, 29#, L-80, ID = 6.184" 10277' PERFORATION SUMMARY REF LOG: SPERRY MWD RESISTNfTY/GR 02/15/98 ANGLE AT TOP PERF: 88 @ 11450' Note: Refer to Production DB for historical pert data SIZE SPF INTERVAL Opn/Sqz DATE 2-3/4" 4 11450 - 11620 C 02/20/98 2-314" 4 11690 - 12005 C 02/20/98 2-3/4" 4 12055 - 12230 C 02!20/98 2-3/4" 4 12275- 12385 C 04/17/04 2-3/4" 4 12405 - 12930 C 04/17/04 2-3/4" 4 12955 - 12995 C 04/17/04 3.687" BKR N CBP PBTD 4-1/2" LNR, 12.6#, L-80, .0152 bpf, ID= 3.958" 18-13 A Current Condition I O I 2110' ~ 4-112" HES :~ ". " ; 51 (SAS t IFT MANfKZFI S ST MD TVD DEV TYPE VLV LTCH PORT DATE 1 3059 3058 8 MMG-M DMY RK 0 04/27/05 2 5350 5218 25 MMG-M DMY RK 0 04/27/05 3 7263 6958 24 MMG-M DMY RK 0 04/27/05 4 8468 7895 54 MMG-M DMY RK 0 04/27/05 8518' 4-1 /2" HES X NIP. ID = 3.813" 8548' BOT S-3 Packer 8583' 4-1/2" HES X NIP. ID = 3.813" 8614' ~ - = 3.813" 8635' 8662' 9-518" X 4-1/2" BKR S-3 PKR, ID= 3.875" 8696' 4-112" HES X NIP, ID= 3.813" 8705' 9-518" X 7" BKR ZXP PKR, ~ = 6.313" 8718' 4-1 /2" WLEG, ID = 3.958" 8720' 7" X 4-1/2" LNR XO, ~ = 3.958" 9225' I~ 4-1/2" HES X NIP, ID = 3.813" 7" LNR MLLOUT WAdDOW 9747' - 9759' (OFF WHIPSTOCK) 1609' 4-1/2" HES X NP, ID = 3.813" I 4-1/2" MLAS JT (28.5'i I DATE REV BY COMMENTS DATE REV BY COMMENTS 12/07187 ORIGINAL COMPLETION 09/24/05 MOR/TLH PX TTP SET (05/13/05) 02/25198 RIG SIDETRACK 05/29/06 DFR/DTM CSG CORRECTIONS (11/24104) 06/13/03 CMO/TLP KB ELEVATION CORRECTION 09/13/03 CMO/TLP DATUM MD/TVD CORRECTIONS 04/17/04 SRB/KAK MILL CIBP 05/03/05 RAGPJC GO GLV (4/27/05) PRUDHOE BAY UNff WELL: 18-13A PERMIT No: '1972230 API No: 50-029-21756-01 SEC 19, T11 N, R15E, 1045' SNL 8 371' EWL BP t3cploratfon (Alaska) TREE = 4-, /, 6" FAAC WELLHEAD= FMC ACTUATOR = BAKER C KB. ELEV = 54.8' BF. ELEV = KOP = 3450' Max Angle = 94 ~ 12441' Datum MD = WA Datum TV D = 8800' SS 113-3/8" CSG, 68#, K-55 /72#, L-80, ID = 12.347" Minimum ID = 3.813" @ 2208' 4-1 /2" CAMCO BAL-O SSSVN 8600' 3-1i2' XN NIP. ID = 2 ~ ~' 8610' 4-1/2" TBG, 12.6#, L-80, .0152 bpf, ID= 3.958" 8717' TOP OF BKR TIEBACK SLV, ID = 7.500" 8698' 9-5/8" X 7" BKR HMC HGR, ID = 6.250" 8711' TOP OF TNV TIEBACK SLV 8805' 9-5/8" X 7" TNV LNR HGR ~-{ $$15' 9-5/8" CSG, 47#, L-80, ID = 8.681" ~~ 9103' `~~miostock fish ~ 9234' 7" LNR 29#, L-80, ID = 6.184" PERFORATION SLMMW\RY REF LOG: SPERRY MWD RESISTNITY/GR 02/15/98 ANGLE AT TOP PERF: 88 ~ 11450' Note: Refer to Productan DB for historical pert data SIZE SPF INTERVAL Opn/Sqz DATE 2-314" 4 11450 - t 1620 C 02/20/98 2-3/4" 4 t 1690 - 12005 C 02/20!98 2-3/4" 4 12055 - 12230 C 02/20/98 2-3/4" 4 12275- 12385 C 04/17/04 2-3/4" 4 12405 - 12930 C 04!17/04 2-3/4" 4 12955- 12995 C 04/17/04 3.687" BKR N P 4-1/2" LNR, 12.6#, L-80, .0152 bpf, ID 3 18-13 B Proposed CTD Sidetrac I O I 13000' 2110' -{ 4 ' , ~ 813„ GAS LIFT MANDRELS ST MD TVD DEV TYPE VLV LTCH PORT DATE 1 3059 3058 8 MMG-M DMY RK 0 04/27/05 2 5350 5218 25 MMG-M DMY RK 0 04/27/05 3 7263 6958 24 MMG-M DMY RK 0 04/27/05 4 8468 7895 54 MMG-M DMY RK 0 04/27/05 8518' 4-1/"1" Ht5 X NIF'. IU= 3,813" 8548' BOT S-3 Packer 8583' 4-1/2" HES X NIP, ID = 3.813" 8600' Top of 3-1/2" Liner. TOC 8614' ~~ - ~- 8635' 8662' 9-5/8" X 4-1/2" BKR S-3 PKR, ID= 3.875" 8696' 4-1 /2" HES X NIP, ID = 3.813" 8705' 9-5/8" X 7" BKR ZXP PKR, ID = 6.313" 8718' 4-1/2" WLEG, ID= 3.958" 8720' 7" X 4-1/2" LNR XO, ID = 3.958" 9200' -j Mechanical b'vhipstoc 10100' 3-3116 x 2-7l8 X-over 3-3/16" X 2-7/8" anted & perfec 9225' 4-1/2" HES X Nom, ID = 7" LNR MLLOUT WNDOW 9747' - 9759' (OFF WHIPSTOCK) 160 4-1/2" HES X NP, ID = 3.813" 11345' ~-~ 4-1/2" MLAS JT I 12700' I DATE REV BY COMMENTS DATE REV BY COMMENTS 12/07187 ORIGINAL COMPLETION 09/24/05 MOR/TLH PX TTP SET (05/13/05) 02/25/98 RIG SIDETRACK 05/29/06 DFR/DTM CSG CORRECTIONS (11/24/04) 06/13/03 CMO/TLP KB ELEVATION CORRECTION 09/13/03 CMO/TLP DATUM MD/TVD CORRECTIONS 04!17/04 SRB/KAK MILL CIBP 05/03/05 RAGPJC GO GLV (4/27/05) PRUDHOE BAY UNfr WELL: 18-13A PERMIT No: 1972230 API No: 50-029-21756-01 SEC 19, T11 N, R15E, 1045' SNL 8 371' EWL BP 6cploration (Alaska) • • ! • r BP Alaska by INTE Baker Hughes INTEQ Planning Report Q Gompaoy: BP Amoco Date: 1f/6/2007 Time: 14:18:23 Page: 1 'Fields Prudhoe Bay Co-ordinate(NE) Reference: Well: 18-13, True North Site: PB DS 18 Vertical (TVD) Reference: 18-13A 54.8 Well: 18-t3 Section (VS) Reference: Well (O.QONA.OOE,125.OOAzi) WeJipath: Plan 2, 18-13B Survey Calarlation 1Vletbod: Minimum Curvature Db: Sybase Field: Prudhoe Bay North Slope UNITED STATES Map System:US State Plane Coordinate System 1927 Map Zoce: Alaska, Zone 4 Geo Datum: NAD27 (Clarke 1866) Coordinate System: Well Centre Sys Datum: Mean Sea Level Geomagnetic Model: bggm2007 Site: PB DS 18 TR-11-14 UNITED STATES :North Slope Site Position: Northing: 5959213. 15 ft Latitude: 70 17 35.252 N From: Map Easting: 691583. 44 ft Longitude: 148 26 55.555 W Position Uncertainty: 0.00 ft North Reference: True Ground Level: 0.00 ft Grid Convergence: 1.46 deg Well: 18-13 Slot Name: 13 18-13 Well Position: +N/S 1605.17 ft Northing: 5960832. 76 ft Latitude: 70 17 51.039 N +E/-W 590.87 ft Easting : 692133. 18 ft Longitude: 148 26 38.331 W Position Uncertainty: 0.00 ft Wellpath: Plan 2, 18-136 Drilled From: 18-13A Tie-on Depth: 9155.80 ft Current Datum: 18-13A Height 54.80 ft Above System Datum: Mean Sea Level Magnetic Data: 9/14/2007 Declination: 23.72 deg Field Strength: 57667 nT Mag Dip Angle: 80.94 deg Vertical Section: Depth From (TVD) +N/-S +E/-W Direction ft ft ft deg 38.80 0.00 0.00 125.00 Plan: Plan #2 Date Composed: 9/14/2007 copy Lamar's plan 2 Version: 9 Principal: Yes Tied-to: From: Definitive Path Targets Map Map <---- 'Latitude ----> <-- Longitude ---> Name Description TVD +N/S +E/-W Northing. Easting; Deg Min Sec I~g Min Sec Dip. I)ir. ' ft ft ft ft ft 18-13AL1 Fault 4 54.80 -3415.07 4889.40 5957544.00 697108.00 70 17 17.436 N 148 24 15.872 W -Polygon 1 54.80 -3415.07 4889.40 5957544.00 697108.00 70 17 17.436 N 148 24 15.872 W -Polygon 2 54.80 -4172.10 5270.20 5956797.00 697508.00 70 17 9.988 N 148 24 4.793 W 18-13AL1 Fault 3 54.80 -973.03 2734.00 5959930.00 694891.00 70 17 41.464 N 148 25 18.647 W -Polygon 1 54.80 -973.03 2734.00 5959930.00 694891.00 70 17 41.464 N 148 25 18.647 W -Polygon 2 54.80 -3174.77 3551.03 5957750.00 695764.00 70 17 19.807 N 148 24 54.864 W 18-13AL1 Fault 2 54.80 -1992.15 4913.79 5958967.00 697096.00 70 17 31.431 N 148 24 15.135 W -Polygon 1 54.80 -1992.15 4913.79 5958967.00 697096.00 70 17 31.431 N 148 24 15.135 W -Polygon 2 54.80 -2905.81 5199.54 5958061.00 697405.00 70 17 22.443 N 148 24 6.826 W Annotation MD TVD ft ft 9155.80 8291.79 TIP 9200.00 8315.02 KOP 9220.00 8325.52 End of 9 Deg/100' DLS 9370.00 8428.75 4 9495.00 8534.29 5 9545.00 8576.83 6 9930.27 8755.21 End of 15 Deg/100' DLS 10130.27 8755.21 8 10480.27 8755.21 9 10780.27 8755.21 10 111.80.27 8755.21 11 • • s~ BP Alaska ,. by INTE Baker Hughes INTEQ Planning Report Q Gompanys BP Amoco Dated 14/6/2007 Time: 14:18:23 Page: 2 .Field: Prudhoe Bay Co=ordinate(NE}Refennce: Well: 1 8-13, True North `..Site: PB DS 18 Vertical (TVD) Reference: 18-13A 54.8 Well: 18-13 Section (VS) Reference: Well (O.OON,O.OOE,125.OOAzi) Wellpallt: Plan 2, 18-13B 5nrvey Calculation'Method: Minimum Curvature Db: Sybase Annotation NID TVD ft_ n 11530.27 8755.21 12 11830.27 8755.21 13 12130.27 8755.21 14 12330.27 8755.21 15 12700.00 0.00 TD Plan Section Information 1~ID Intl Azim TVD +N/-S +E!-W DLS Build Tarn ' TFO Target' ft deg deg ft _ ft ft deg/100ft deg1100ft deg/100ft- deg 9155.80 57.40 133.00 8291.79 -1807.90 2186.80 0.00 0.00 0.00 0.00 9200.00 59.21 133.00 8315.02 -1833.54 2214.30 4.10 4.10 0.00 360.00 9220.00 57.41 133.00 8325.52 -1845.15 2226.75 9.00 -9.00 0.00 1 80.00 9370.00 34.91 133.00 8428.75 -1918.46 2305.37 15.00 -15.00 0.00 1 80.00 9495.00 31.42 98.93 8534.29 -1948.18 2364.23 15.00 -2.79 -27.26 245.30 9545.00 32.21 113.10 8576.83 -1955.44 2389.40 15.00 1.59 28.35 90.00 9930.27 90.00 113.10 8755.21 -2082.25 2686.67 15.00 15.00 0.00 0.00 10130.27 90.00 137.10 8755.21 -2196.42 2849.10 12.00 0.00 12.00 90.00 10480.27 90.00 95.10 8755.21 -2346.98 3156.42 12.00 0.00 -12.00 270.00 10780.27 90.00 131.10 8755.21 -2462.76 3427.84 12.00 0.00 12.00 90.00 11180.27 90.00 83.10 8755.21 -2576.98 3799.07 12.00 0.00 -12.00 270.00 11530.27 90.00 125.10 8755.21 -2660.36 4130.98 12.00 0.00 12.00 90.00 11830.27 90.00 89.10 8755.21 -2747.14 4413.02 12.00 0.00 -12.00 270.00 12130.27 90.00 125.10 8755.21 -2833.92 4695.06 12.00 0.00 12.00 90.00 12330.27 90.00 101.10 8755.21 -2911.82 4877.68 12.00 0.00 -12.00 270.00 12700.00 90.00 145.47 8755.21 -3109.70 5179.09 12.00 0.00 12.00 90.00 Survey MD Intl Azim SS TVD N/S E/W MapN MapE ' DLS VS TFO Tao ft deg deg ft ft ft ft ft degl100ft ft deg` 9155.80 57.40 133.00 8236.99 -1807.90 2186.80 5959081.47 694365.35 0.00 2828.29 0.00 MWD 9200.00 59.21 133.00 8260.22 -1833.54 2214.30 5959056.53 694393.50 4.10 2865.53 360.00 MWD 9220.00 57.41 133.00 8270.72 -1845.15 2226.75 5959045.25 694406.24 9.00 2882.38 180.00 MWD 9300.00 45.41 133.00 8320.53 -1887.72 2272.39 5959003.87 694452.95 15.00 2944.19 180.00 MWD 9370.00 34.91 133.00 8373.95 -1918.46 2305.37 5958973.97 694486.70 15.00 2988.83 180.00 MWD 9400.00 33.25 125.53 8398.81 -1929.10 2318.34 5958963.67 694499.94 15.00 3005.56 245.30 MWD 9495.00 31.42 98.93 8479.49 -1948.18 2364.23 5958945.78 694546.30 15.00 3054.10 251.49 MWD 9500.00 31.42 100.37 8483.75 -1948.62 2366.80 5958945.41 694548.88 15.00 3056.45 90.00 MWD 9545.00 32.21 113.10 8522.03 -1955.44 2389.40 5958939.16 694571.65 15.00 3078.88 88.77 MWD 9600.00 40.46 113.10 8566.30 -1968.22 2419.35 5958927.16 694601.91 15.00 3110.74 0.00 MWD 9700.00 55.46 113.10 8633.08 -1997.27 2487.47 5958899.85 694670.74 15.00 3183.20 0.00 MWD 9800.00 70.46 113.10 8678.41 -2032.12 2569.16 5958867.11 694753.30 15.00 3270.11 0.00 MWD 9900.00 85.46 113.10 8699.21 -2070.38 2658.86 5958831.15 694843.94 15.00 3365.53 0.00 MWD 9930.27 90.00 113.10 8700.41 -2082.25 2686.67 5958820.00 694872.04 15.00 3395.12 0.00 MWD 10000.00 90.00 121.47 8700.41 -2114.19 2748.59 5958789.66 694934.76 12.00 3464.16 90.00 MWD 10100.00 90.00 133.47 8700.41 -2174.91 2827.81 5958730.98 695015.50 12.00 3563.89 90.00 MWD 10130.27 90.00 137.10 8700.41 -2196.42 2849.10 5958710.03 695037.33 12.00 3593.66 90.00 MWD 10200.00 90.00 128.73 8700.41 -2243.86 2900.13 5958663.91 695089.55 12.00 3662.67 270.00 MWD 10300.00 90.00 116.73 8700.41 -2297.83 2984.09 5958612.10 695174.86 12.00 3762.41 270.00 MWD 10400.00 90.00 104.73 8700.41 -2333.17 3077.44 5958579.16 695269.08 12.00 3859.15 270.00 MWD 10480.27 90.00 95.10 8700.41 -2346.98 3156.42 5958567.38 695348.38 12.00 3931.76 270.00 MWD 10500.00 90.00 97.47 8700.41 -2349.14 3176.03 5958565.72 695368.04 12.00 3949.06 90.00 MWD 10600.00 90.00 109.47 8700.41 -2372.39 3273.10 5958544.96 695465.67 12.00 4041.92 90.00 MWD 10700.00 90.00 121.47 8700.41 -2415.32 3363.22 5958504.36. 695556.85 12.00. 4140.36 90.00 MWD 10780.27 90.00 131.10 8700.41 -2462.76 3427.84 5958458.58 695622.66 12.00 4220.51 90.00 MWD 10800.00 90.00 128.73 8700.41 -2475.43 3442.98 5958446.31 695638.11 12.00 4240.17 270.00 MWD 10900.00 90.00 116.73 8700.41 -2529.40 3526.94 5958394.50 695723.42 12.00 4339.91 270.00 MWD 11000.00 90.00 104.73 8700.41 -2564.74 3620.30 5958361.56 695817.64 12.00 4436.65 270.00 MWD • ~~s BP Alaska by iNTE Baker Hughes INTEQ Planning Report Q Gompauy: BP Amoco Date: 11(6/2007 Time: 14:1823 Page: 3 Field: Prudhoe Bay Go•ordinatetNE) Reference: Well: 1 8=13, True North Site: PB DS 18 Vertical (1'VD) Reference: 18-13A 54:8 Well: 1$-13 Secdon(VS)R~erence: WeU(O.OON,O,OOE,125.OOAzi) Welipath: Plan 2,.18-13B Snrvey Cslculation Method: Minimum Curvature Db: Sytaase Survey MD Inel Azim SS TVD N/S E!W MapN MapE DLS VS TFO Too ft- " deg deg ft ft ft ft ft' deg/100ft ft deg 11100.00 90.00 92.73 8700.41 -2579.90 3718.96 5958348.94 695916.65 12.00 4526.16 270.00 MWD 11180.27 90.00 83.10 8700.41 -2576.98 3799.07 5958353.90 695996.67 12.00 4590.12 270.00 MWD 11200.00 90.00 85.47 8700.41 -2575.02 3818.71 5958356.36 696016.24 12.00 4605.07 90.00 MWD 11300.00 90.00 97.47 8700.41 -2577.58 3918.49 5958356.35 696116.05 12.00 4688.28 90.00 MWD 11400.00 90.00 109.47 8700.41 -2600.83 4015.56 5958335.59 696213.68 12.00 4781.13 90.00 MWD 11500.00 90.00 121.47 8700.41 -2643.75 4105.68 5958294.99 696304.86 12.00 4879.57 90.00 MWD 11530.27 90.00 125.10 8700.41 -2660.36 4130.98 5958279.03 696330.57 12.00 4909.82 90.00 MWD 11600.00 90.00 116.73 8700.41 -2696.16 4190.75 5958244.78 696391.24 12.00 4979.31 270.00 MWD 11700.00 90.00 104.73 8700.41 -2731.50 4284.10 5958211.84 696485.46 12.00 5076.05 270.00 MWD 11800.00 90.00 92.73 8700.41 -2746.66 4382.76 5958199.21 696584.47 12.00 5165.56 270.00 MWD 11830.27 90.00 89.10 8700.41 -2747.14 4413.02 5958199.50 696614.73 12.00 5190.63 270.00 MW D 11900.00 90.00 97.47 8700.41 -2751.13 4482.58 5958197.28 696684.36 12.00 5249.90 90.00 MWD 12000.00 90.00 109.47 8700.41 -2774.38 4579.65 5958176.52 696781.99 12.00 5342.75 90.00 MWD 12100.00 90.00 121.47 8700.41 -2817.31 4669.76 5958135.92 696873.16 12.00 5441.19 90.00 MWD 12130.27 90.00 125.10 8700.41 -2833.92 4695.06 5958119.96 696898.88 12.00 5471.44 90.00 MWD 12200.00 90.00 116.73 8700.41 -2869.72 4754.83 5958085.71 696959.54 12.00 5540.93 270.00 MWD 12300.00 90.00 104.73 8700.41 -2905.05 4848.18 5958052.77 697053.76 12.00 5637.67 270.00 MWD 12330.27 90.00 101.10 8700.41 -2911.82 4877.68 5958046.76 697083.42 12.00 5665.71 270.00 MWD 12400.00 90.00 109.47 8700.41 -2930.19 4944.89 5958030.12 697151.07 12.00 5731.30 90.00 MWD 12500.00 90.00 121.47 8700.41 -2973.11 5035.00 5957989.51 697242.25 12.00 5829.74 90.00 MWD 12600.00 90.00 133.47 8700.41 -3033.84 5114.23 5957930.84 697322.99 12.00 5929.46 90.00 MWD 12700.00 90.00 145.47 8700.41 -3109.70 5179.09 5957856.66 697389.77 12.00 6026.11 90.00 2 7/8" • by BP Alaska Anticollision Report ~.r iNTEQ Company: BPAmotA Date: 11/6/2007 Time: 14:45:04 Page: 1 Field: Prudhoe Bay , Reference Site: PB DS 18 Co-ordinatc(NE) Refe rence: Well: 18-13, True North Reference WeB: 18-13: Verticel (TVD) Reference: 18-13A 54.8 Reference Wellpathc Plart2, 18-138 Db: Oracle GLOBAL SCAN APPLIED: All wellpaths within 20(1'+ 100/1000 of reference -There are 7~T1$aeells in thin tlfdhtOpai Plan & PLANNED PROGRAM Interpolation Method : MD Iaterval: 25.00 ft Error Model: ISCWSA Ellipse Depth Range: 9155.80 to 12700.00 ft Scau Method: Trav Cylinder North Maximum Radius: 2500.00 ft Error Surface: Ellipse + Casing Survey Program for Definitive Weitpath Date: 11/6/2007 Validated: No Version: 1 Planned From To Survey Toolcode Tool Name ft ft 2706.80 9155.80 Survey #1 (2706 .80-13045.00) ( MWD MWD -Standard 9155.80 12700.00 Planned: Plan #2 V9 MWD MWD -Standard Casing Points MD TVD biameter Hok Size Name ft ft in in 12700.00 8755.21 2.875 4.125 2 7/8" Summary Offset Wellpath ~ Reference OtLtet Ctr-Ctr ` No-Go Allowable Site Well Weilpath MD MD- Distaace Area Deviation Warning ft ft ft ft ft 18-13,PIan 2, 18-13B,P 12550.00 12550.00 0.00 308.49 -308.49 FAIL: Major Risk Lis DS 02 L2-03A L2-03A V6 9387.79 11675.00 731.86 226.66 505.21 Pass: Major Risk PB DS 18 18-12 18-12 V1 12517.81 10925.00 621.34 536.14 85.20 Pass: Major Risk PB DS 18 18-12 18-12A V1 12517.81 10925.00 621.34 538.45 82.89 Pass: Major Risk PB DS 18 18-12 18-128 V3 12517.81 10925.00 621.34 538.77 82.57 Pass: Major Risk PB DS 18 18-13 18-13 V3 9247.70 9250.00 5.34 277.31 -271.97 FAIL: Major Risk PB DS 18 18-13 18-13A V4 10938.37 10825.00 163.17 391.46 -228.29 FAIL: Major Risk PB DS 18 18-13 18-13PB1 V1 Out of range PB DS 18 18-13 18-13PB2 V3 9247.70 9250.00 5.34 278.13 -272.79 FAIL: Major Risk PB DS 18 18-15A 18-15A V1 9601.41 10116.80 837.17 276.30 560.87 Pass: Major Risk PB DS 18 18-158 18-158 V9 10587.70 11375.00 314.79 361.88 -47.09 FAIL: Major Risk PB DS 18 18-21 18-21 V1 12221.66 10625.00 571.01 492.82 78.19 Pass: Major Risk PB DS 18 18-21A 18-21A V1 12221.66 10625.00 571.01 492.99 78.01 Pass: Major Risk PB DS 18 18-22 18-22 V1 9162.96 9425.00 1048.73 275.86 772.87 Pass: Major Risk PB DS 18 18-22 18-22A V1 10235.59 10625.00 951.12 329.59 621.53 Pass: Major Risk PB DS 18 18-28 18-28 V1 12500.00 11950.00 1280.17 550.35 729.81 Pass: Major Risk PB DS 18 18-30 18-30 V1 11600.00 10400.00 1081.42 467.86 613.57 Pass: Major Risk Site: Well: Rnle Assigned: Major Risk Wellpath: 18-13,PIan 2, 18-136,PIan #2 Inter-Site Error: 0.00 ft .Reference OfLcet Semi-Major Axie Ctr-Ctr No-Go Allowable MD TVI) MD TVD Ref Offset TFO+AZI TFO-HS Casing/HSDivtance Area Deviation Warning ft ft ft ft ft ft deg deg in tt ft ft 9155.80 8291.79 9155.80 8291.79 42.12 0.00 133.00 0.00 4.125 0.00 159.52 -159.52 FAIL 9175.00 8302.03 9175.00 8302.03 42.33 0.14 133.00 0.00 4.125 0.00 160.23 -160.23 FAIL 9200.00 8315.02 9200.00 8315.02 42.60 0.33 133.00 0.00 4.125 0.00 161.18 -161.18 FAIL 9225.00 8328.24 9225.00 8328.24 42.79 0.68 133.00 0.00 4.125 0.00 161.99 -161.99 FAIL 9250.00 8342.66 9250.00 8342.66 42.98 1.01 133.00 0.00 4.125 0.00 163.00 -163.00 FAIL 9275.00 8358.37 9275.00 8358.37 43.16 1.34 133.00 0.00 4.125 0.00 164.02 -164.02 FAIL 9300.00 8375.33 9300.00 8375.33 43.34 1.65 133.00 0.00 4.125 0.00 165.00 -165.00 FAIL 9325.00 8393.45 9325.00 8393.45 43.50 1.95 133.00 0.00 4.125 0.00 165.95 -165.95 FAIL 9350.00 8412.66 9350.00 8412.66 43.66 2.22 133.00 0.00 4.125 0.00 166.86 -166.86 FAIL 9375.00 8432.86 9375.00 8432.86 43.81 2.46 131.80 0.00 4.125 0.00 167.72 -167.72 FAIL 9400.00 8453.61 9400.00 8453.61 43.92 2.66 125.53 0.00 4.125 0.00 168.31 -168.31 FAIL 9425.00 8474.64 9425.00 8474.64 43.86 2.85 118.85 0.00 4.125 0.00 168.50 -168.50 FAIL 9450.00 8495.87 9450.00 8495.87 43.64 3.04 111.86 0.00 4.125 0.00 168.29 -168.29 FAIL 9475.00 8517.21 9475.00 8517.21 43.26 3.21 104.69 0.00 4.125 0.00 167.69 -167.69 FAIL 9500.00 8538.55 9500.00 8538.55 42.99 3.38 100.37 0.00 4.125 0.00 167.27 -167.27 FAIL 9525.00 8559.86 9525.00 8559.86 43.69 3.55 107.51 0.00 4.125 0.00 168.82 -168.82 FAIL are L _~ ~ 18-136 BAG Dowel I srPs Blind/Shears TOTs 2 3/8" combi ram/slips Mud Cross I I Mud Cross ~~oss variable bore pipe 3 1/2"-2 718" TOTs 2 3/8" combi ram/slips Swab V Flow Tee Alaska Department of Natural Resources Land Administration System Page 1 of 2 See Township, Range, Section and Acreage? New Search ~~ Yes ~"`~ No _____.__ _____ __ L..AS en~~ ~ Case Abstract ~ Case Detail ~ Larrc! Abstract F11e: ~DL 25321 '~' Sear~:h for Status Plat Upriates ;~ r~l I I ~ 1312007 Customer: 000107377 C3P EXPLORATION (ALASKA) TNC PO BOX 196612/900 E. BENSON BL ATTN: LAND MANAGER- ALASKA ANCHORAGE AK 995196612 Case Type: ~ OIL & GAS LEASE COMP DNR Unit: 780 OIL AND GAS File Location: DOG DIV OIL AND GAS C~aSe Status: 35 ISSUED Status Dute: 09/14/1965 Total Acres: 2480.000 Date hzitiutec l: 05/28/ 1965 Offic°e of Pj~ir~~ai y Respof~sibilrth: DOG DIV OIL AND GAS 1 ast Transaction Date: 12/04/2006 Case Suht}~pe : ~ NORTH SLOPE Lust Ti-at~saction: AA-NRB ASSIGNMENT APPROVED Meric~icrn: l_' 7~nrtt~ltip: 0] 1N h'~rrr,~~~.~ Ol 5L Section: I S~~~ctir,tt l~:t~~~s: 640 ~earcti Plats Meridiaft.~ t' 7utir~islti?r O1 1N I~crrr~e: 01:1_ 5'c~c~ltun.~ I ~ ti'~~~~lrn~i l~~f~~~~~. ~c~~~ 117eridi~rtt_ t_' 7uutr.elzip: Ol1N l~an,rc~ 01~1~ Sc'cltr,tr: I~~ 5'~ctrutr_J~~r~~~: (,Ul Meridru~i~ L' 7~~inn{tip: 011N l~~nt,~c~: OlSE S~>~~tr~~rt.~ ~U 5~~°c~iutt .Icr~rs: 6-lO Legal llesccipti~n 0~-28-196 * * * SALE NOTICE LL'G_AL DESCRIPTION Cl-1-1~1 TIIN, R[~E, U~~I1~, 18. 19, 202-150.00 t~ t e~5 Ali t't1111 " Last updated on 11/13/2007. http://www.dnr. state.ak.us/las/Case_Summary.cfm?FileType=ADL&FileNumber=28321... 11 /13/2007 10'1J till Vl!!lLLL~ V~JC"ilCL4lV1lJ ri'l~'G 1 Vl 1 • Maunder, Thomas E (~A) From: Gantt, Lamar L [lamar.gantt~bp.com) Sent: Tuesday, November 06, 2007 i : i 6 PM To: Maunder, Thomas E (DOA) Cc: Hubby, Terre !_ Subject: 18-13 AL1 drilling operations Tom ~~~ i~ 1 ~ ~7 The Nordic 2 rig is currently on the 18-13A well and is experiencing difficulties that wilt prevent us from completing the approved 18-13 All scope of work. The 18-13AL1 original scope was to exit the existing Nner at 11250' MD, dose to horzontai, tam and dnil! a horizontal lateral to the north. The proposed completion strategy was to complete with a sbtted 6r~er with an openhole junction at the window, and retrieve the whipstock to allow future rye-entry into the parent welltxue In the process of running the retrievable whipstock, it became stuck in the we#bore and we have been unable to pail it out of the hole. iNe were sucxessful in pushing if downhole to 9235, but have decided the best course of action from here wark! be to change the soaps of this sidetrack. We are currently developing a plan to set a whipstock at 9200 ft, MD, mill a window and directiortaayr drift to the target Zone 1 horizon and drill a new horizontal lateral to a MD of 12700' MD. The new BHt_ will be located roughty halfway between the 18-13A and the proposed 18-13 AL1 permitted BHL(greater than 500 feet away):; Because of the change in KOP, the current proposed completion will be a Demented and perforated liner. As such, the parent 18-13 A wellbore will be isolated by the r.~emertt and the new welibore wfil be Warned i 8-138. We request verbal permission to pursue this near proposed scope and will follow with a formal revised permit to drill for the 18-138 as soon as we can complete the plans. Lamar L. Gantt CTD Engineer - Conoc:oPhiilips Alaska, Inc. ,~, j Office: 907564-5593 ~}~~~' " Cell: 907 240-8045 ~~ ~ ~~~ ~~ ~~ ~ ~~~ ,~3~ ,3~ G,d~ r../ l .--~ ~- p ~ /3~0 11/6/2007 • TRANSMITTAL LETTER CHECKLIST WELL NAME ~~L/ /~~3~ 1'TD# ~O~/SAO Development Service Exploratory Stratigraphic Test Non-Conventional Well Circle Appropriate Letter /Paragraphs to be Included in Transmittal Letter CHECK ADD-ONS TEXT FOR APPROVAL LETTER WHAT (OPTIONS) APPLIES MULTI LATERAL The permit is for a new wellbore segment of existing well ' (If last two digits in permit No. , API No. 50- - - API number are production should continue to be reported as a function of the between 60-69) original API number stated above. OT HOLE PII In accordance with 20 AAC 25.005(f), all records, data and logs . acquired for the pilot hole must be clearly differentiated in both well name ( PH) and API number (SO- _~ from records, data and logs acquired for well SPACING The permit is approved subject to foil compliance with 20 AAC EXCEPTION 25.455. Approval to perforate and produce /inject is contingent upon issuance of a conservation order approving a spacing exception.. assumes the liability of any protest to the spacing exception that may occur. DRY DTfCH All dry ditch sample sets submitted to the Commission must be in SAMPLE no greater than 30' sample intervals from below the permafrost or from where samples are first caught and 10' sample intervals through target zones. Please note the following special condition of this permit: Non-Conventional production or production testing of coa! bed methane is not allowed Well for (name of well) until after ~Comnanv Name) has designed and implemented a water well testing program to provide baseline data on water quality and quantity. (Comuany Name) must contact the Commission to obtain advance approval of such water well testing ro am. Rev: 7/13/2007 r WELL PERMIT CHECKLIST Field & Pool PRUDHOE BAY, PRUDHOE OIL - 640150 _Well Name: PRUDHOE BAY UNIT 18-13B Program DEV _ Well bore seg ^ PTD#:2071570 Company BP EXPLORATION (ALASKA) INC _ __ Initial ClasslType DEV / PEND _ GeoArea 890 Unit 11650 ONOff Shore On Annular Disposal ^ Administration 1 PeRnit_fee attached_ NA- ~2 Leas_enumberappropriate_____ _______________ -- - Yes_ -- _____-.- 3 Uniquewell_n_ameandnumbet________________ __ ________ Yes. ____-___-____-__---_-_. 4 Well located in_a defined-pool- Yes 5 Well located properdiskance from drilling unh_boundary_ - - - Yes - - 6 Well located proper distance from other wells_ - - _ Yes 7 Sufficient acreage_available in_drilling unit- - - Yes 8 If_deviated, is-wellbore platincluded _ _ - ----- Yes ----- 9 Operalot only affected party. _ _ _ - _ _ _ _ _ Yes _ - .. 110 Ope[atorhos-appropriate bond in force - _ _ _ _ - _ _ _ _ _ - . _ _ - - _ -- Yes - ---------- - _ _ - _ _ Blanket Bond # 6194193 - _ _ _ _ _ _ - - _ ------------------------------------- 11 Permit. can be issued without conservation order_ Yes - ---- . - - - - - - Appr Date 12 Permit_ can be issued without administrative_approYal - .. - Yes - - ACS 11!13!2007 13 Can permit be approved before 15-day wait Yes 14 Well located within area and-strata authorized by Injection Order # (put 10# in_comments)_ (Fqr_ NA . 15 All wells_within 1!4-mile_area_of review identified (For service well only)_ _ _ _ _ _ _ _ _ _ _ _ _ _ NA _ _ - _ - - _ _ _ _ _ _ - _ - - _ - - ---------------------------- 16 Pre-produced injector, duraticn_of pre-production less than 3 months_ (Forservice well only) - NA_ ----------------- - - - - - - _ 17 Nonconuen, gas conforms to AS31.05,030(j.1_.A),O.2.A-D) NA- Engineering 18 Conductor string_provided NA- - -- -- --- --- Conductor set in 18-13 (187-100). 19 Surface casing protects all_known USDWS _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ NA_ _ _ _ _ . No aquifers, A1O 4B,_conclusion s, - - - _ _ _ 20 _C_MT_v_ol adequate-to circulate.on conductor& surf-csg _ _ _ - NA_ _ _ _ _ _ _ Surface casing set in 18-13, _ _ - _ - - - _ _ x, 21 CMT v_ol adequate to tie-in_long string to_surf csg - . - - NA_ Prooduction_ eosin set in_18-13._ 9- 22 C_MTwillcoyerallknown_productivehorizons.-____-___--_ ______Y_es_ ____ _______________ __ 23 Casing desyns adequate for C,_T, B &- permafrost_ Yes 24 Adequate tankage. or reserve pit _ - - Yes Rig is_equipped with steel_pits.- No reserve_pit-planned, All waste to_a roved dis oral well s . PP P- ( ) 25 If.a-re-drill, has_a 10-403 for abandonment been approved No_ 307-344 in_house. Oral approval given to proceed by DTS 11106!07, 26 Adequate wellbore separation_proposed- _ _ _ _ _ _ _ - _ - - - - - - - - - - - - - Yes _ _ _ Proximity analysis performed, Nearest segment is 18-13A and_paths diverge. _ _ _ _ _ - - - _ _ _ _ _ - - - , - - 27 If_dive[ter required, does it meet regulations_ - NA. BOP stack_will alread _be_in -lace, Y P- Appr Date 28 Drilling fluid-program schematic_& equip.list-adequate _ - - - - - - _ - - Yes - - - _ Maximum expected formatign pressure 7,3_EMW. Planned MW 8,6_ppg._ TEM 11113!200 7 29 BO_PEs,_d_o they meet regulation , _ - -- Yes _,,,, rt ''iV\ ~ 30 BOPE-press rating appropriate, test to_(put prig in comments) - - - - - - - - - - - - - - - - Yes _ _ MASP calculated at 2438psi. 3500_psi BOP t_est_proposed._ _ -" i 31 Choke manifold complies wIAPI_ RP-53 (May 84) Yes - 1 32 Work will occur without operation shutdown_ Yes 33 Is presence of H2S gas_ probable Y_es - Minor_ H2S-reported at DS-18, Mud should_preclude H2S on rig. _Rig has sensors_and alarms, 34 Mechanical_condition of wells within AOR verified (For service well only) - - NA_ - Geology ( 35 Permit_can be issued wlo hydrogen-sulfide measures_ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ No_ - - -~- Drill-Site 18 has 18-20_ppm-H2S (18-1.4B on 5/11/07). - 36 Data_presented on potential overpressure zones_ - - - NA ppr ate ; 37 Seismic_analysis of shallow gas zones_ NA 1 00 7 38 Seabed condition surrey (if off_-shore) . NA 39 Contact name/phone fo_r weekly_ progress reports [exploratory only) Yes Lamar Gantt 564.5593, Abby_Higb_ie 564-5480. Geologic Commissioner: Engineering is Date: Commissioner: Date is er Date ~ ~ s 11I}~ J ~ ~~- <<-j3.~,~ ~~-~ 3- o ~ ~~ • Well History File APPENDIX i Information of detailed nature that is not particularly germane to the Well Permitting Process but is part of the history file. To improve the readability of the Well History file and to simplify finding information, iniormalion of this nature is accumulated at the end of the file under APPENDIX. No special effort has been made io chronologically organize this category of inforr-nation. **** REEL HEADER **** MWD 08/07/22 BHI Ol LIS Customer Format Tape **** TAPE HEADER **** MWD 07/12/03 1643649 01 3" CTK *** LIS COMMENT RECORD *** Version Information VERS. 1.20: CWLS log ASCII Standard -VERSION 1.20 WRAP. N0: One line per frame !!!!!!!!!!!!!!!!!!! Remark File Version 1.000 !!!!!!!!!!!!!!!!!!! Extract File: ldwg.las Well Information Block #MNEM.UNIT Data Type Information STRT.FT 9050.0000: Starting Depth STOP. FT 11560.0000: Ending Depth STEP.FT 0.5000: Level Spacing NULL. -999.2500: Absent Value COMP. COMPANY: BP Exploration (Alaska), Inc. WELL. WELL: 18-13B FLD FIELD: Prudhoe Bay Unit LOC LOCATION: 70 deg 17' 51.039"N 148 deg 26' 38.331"W CNTY. COUNTY: North Slope Borough STAT. STATE: Alaska SRVC. SERVICE COMPANY: Baker Hughes INTEQ TOOL. TOOL NAME & TYPE: 3" CTK DATE. LOG DATE: 03 Dec 2007 API API NUMBER: 500292175602 Parameter Information Block Description Section Township Range Permanent Datum Elevation Of Perm. Datum Log Measured from Feet Above Perm. Datum Drilling Measured From Elevation of Kelly Bushing Elevation of Derrick Floor Elevation of Ground Level Casing Depth Other Services Line 1 (1) All depths are Measured Depths (MD) unless otherwise noted. #MNEM.UNIT Value #--------- ------------------------- SECT. 19 TOWN.N T11N RANG. R15E PDAT. MSL EPD .F 0 LMF KB FAPD.F 54.80 DMF KB EKB .F 0 EDF .F 54.80 EGL .F 0 CASE.F N/A OS1 DIRECTIONAL Remarks app C S'~- ~ f to ~Z5 '~~- T (2) All depths are Bit Depths unless (3) All True Vertical Depths (TVDSS) (4) All Formation Evaluation data is (5) Baker Hughes INTEQ utilized Coil' Advantage i otherwise noted. are Subsea corrected. realtime data. Prak downhole tools and the surface system to log this well.. (6) Tools ran in the string included Casing Collar Locator, an Electrical Disconnect and Circulating Sub, a Drilling Performance Sub (Inner and Outer Downhole Pressure, Vibration and Downhole Weight on Bit), a Directional and Gamma Sub, and a Hydraulic Orienting Sub with a Near Bit Inclination Sensor. (7) Data presented here is final and has been depth adjusted to a PDC (Primary Depth Control) log provided by Schlumberger GR MCNL dated 07 Dec 2007 per Doug Stoner with BP Exploration (Alaska), Inc. (8) Tied to 18-13A at 9107 feet MD (8210 feet TVDSS). (9) The sidetrack was drilled from 18-13A off the whipstock set at 9200 ft MD (8260 ft TVDSS) through the dual liner. Top of window 9202 ft.MD {8261 ft.TVDSS) Bottom of window 9211 ft.MD (8265 ft.TVDSS) (10) Baker Hughes INTEQ runs 1 through 5 and run 9 were used to set a whipstock, mill, fish and drill 18-12BPB1 . (11) Baker Hughes INTEQ runs 10 through 13 were used to set a billet, mill and drill 18-13BPB2. (12) Baker Hughes INTEQ runs 14 through 19 were used to set a billet, mill and drill 18-13BPB3. (13) Baker Hughes INTEQ runs 20 through 23 were used to unseccessfully kickoff through a billet, cement and kickoff. (14) The open hole sidet rack was drilled from 9660 feet MD (8600 feet TVDSS) from 18-13BPB1 off cement plug. (15) The interval from 1 1512 feet to 11550 feet MD (8696 feet to 8697 feet TVDSS) was not logged due to sensor to bi t offset at well TD. (16) The rate of penetra tion interval from 9200 feet to 9310 feet MD (8260 feet to 8326 feet TVDSS) was not logged due to an error with the surface sys tem. MNEMONICS: GRAX -> Gamma Ray [MWD] (MWD-API units) ROP AVG -> Rate of Pene tration, feet/hour _ TVD -> True Vertica l Depth (Subsea) CURVE SHIFT DATA BASELINE, MEASURED, DISPLACEMENT 9084.05, 9090.06, ! 6.01172 9086.96, 9095.45, ! 8.49902 9091.72, 9098.36, ! 6.63379 9096.7, 9102.92, ! 6.21875 9101.26, 9107.48, ! 6.21875 9103.95, 9109.76, ! 5.80469 9107.27, 9115.15, ! 7.87695 9113.49, 9120.12, ! 6.63379 9116.18, 9122.2, ! 6.01172 9196.13, 9199.86, ! 3.73145 9201.52, 9206.7, ! 5.18262 9208.98, 9212.71, ! 3.73145 9210.64, 9214.99, ! 4.35352 9211.67, 9217.06, ! 5.38965 9212.71, 9218.72, ! 6.01172 9218.72, 9224.11, ! 5.38965 9221.83, 9227.01, ! 5.18164 9224.73, 9229.92, ! 5.18262 9232.01, 9237.61, ! 5.59766 9238.02, 9243.41, ! 5.38965 ~~ J 9243, 9248.18, ! 5.18262 9252.12, 9257.92, ! 5.80371 9267.29, 9273.31, ! 6.01172 9282.22, 9286.57, ! 4.35254 9291.13, 9296.11, ! 4.97559 9292.58, 9298.18, ! 5.59766 9294.6, 9299.99, ! 5.38965 9295.64, 9302.06, ! 6.42578 9300.61, 9306.21, ! 5.59668 9313.56, 9319.58, ! 6.01172 9315.01, 9321.23, ! 6.21875 9317.29, 9323.31, ! 6.01172 9321.44, 9326.42, ! 4.97461 9323.72, 9329.53, ! 5.80371 9329.32, 9335.33, ! 6.01172 9332.43, 9338.02, ! 5.59668 9335.54, 9340.93, ! 5.38965 9338.02, 9344.04, ! 6.01172 9340.3, 9346.52, ! 6.21875 9342.78, 9349, ! 6.21875 9346.93, 9352.73, ! 5.80371 9350.66, 9355.84, ! 5.18164 9353.98, 9359.99, ! 6.01172 9362.99, 9368.59, ! 5.59766 9373.98, 9379.99, ! 6.01172 9429.06, 9434.24, ! 5.18164 9439.05, 9442.58, ! 3.52441 9463.51, 9468.9, ! 5.38965 9465.38, 9471.81, ! 6.42578 9481.13, 9487.77, ! 6.63379 9489.01, 9499.17, ! 10.1572 9502.78, 9507.14, ! 4.35352 9506.1, 9512.32, ! 6.21875 9509, 95 15.64, ! 6.63379 9511.08, 9517.09, ! 6.01172 9512.73, 9517.92, ! 5.18262 9514.81, 9520.2, ! 5.38965 9517.09, 9523.72, ! 6.63379 9520.4, 9526, ! 5.59766 9525.17, 9530.98, ! 5.80469 9529.53, 9533.26, ! 3.73145 9531.6, 9537.82, ! 6.21875 9535.74, 9542.17, ! 6.42676 9539.06, 9544.87, ! 5.80371 9541.96, 9547.56, ! 5.59766 9543.41, 9549.01, ! 5.59766 9554.7, 9558.64, ! 3.93848 9557.19, 9560.71, ! 3.52344 9593.82, 9599, ! 5.18164 9600.25, 9605.64, ! 5.38965 9605.01, 9610.4, ! 5.38965 9620.77, 9625.54, ! 4.76758 9652.21, 9657.19, ! 4.97559 9656.15, 9662.37, ! 6.21875 9659.67, 9664.65, ! 4.97559 9662.78, 9668.8, ! 6.01172 9666.1, 9671.49, ! 5.38965 9669.21, 9673.77, ! 4.56055 9672.11, 9676.88, ! 4.76855 9674.6, 9679.16, ! 4.56055 9678.75, 9683.31, ! 4.56055 9681.86, 9686.83, ! 4.97559 9688.49, 9693.05, ! 4.56055 9690.35, 9695.53, ! 5.18262 9695.32, 9702.58, ! 7.25586 9707.97, 9712.11, ! 4.14551 9723.51, 9728.07, ! 4.56055 • 9731.84, 9735.99, 9734.33, 9738.48, 9735.37, 9739.93, 9738.68, 9742.83, 9757.96, 9764.39, 9771.01, 9775.37, 9775.99, 9780.34, 9779.1, 9783.87, 9782.42, 9788.22, 9795.62, 9800.19, 9798.53, 9804.33, 9813.25, 9817.81, 9896, 9901.59, 9994.85, 9999.61, 9998.99, 10004,2, 10001.9, 10007.7, 10006.5, 10011, 10010.2, 10015, 10013.3, 10019.7, 10015.6, 10021.4, 10019.7, 10025.5, 10022.2, 10028.8, 10027.2, 10031.3, 10048.1, 10052.8, 10057.4, 10061.7, 10060.3, 10065.5, 10150.3, 10155.3, 10154.7, 10159, 10159.3, 10164, 10210.4, 10215.2, 10211.9, 10216.9, 10215.4, 10220.2, 10217.5, 10221.8, 10218.3, 10224.1, 10300.6, 10303.9, 10313.2, 10314.5, 10320.5, 10323, 10324.9, 10326.7, 10339.9, 10345.1, 10352.1, 10354.2, 10416.7, 10419.2, 10421.5, 10421.7, 10428.9, 10429.8, 10431.8, 10432.5, 10433.5, 10433.5, 10435.4, 10434.7, 10437.2, 10438.3, 10439.9, 10442.4, 10449, 10447.2, 10451.3, 10450.9, 10454.4, 10454.4, 10457.8, 10461.1, 10461.5, 10465.6, 10467.1, 10470.2, 10471, 10472.5, 10475.4, 10478.3, 10479.9, 10485.9, 10488, 10491.1, 10490.1, 10493.2, 10496.1, 10498.8, 10498.6, 10500.9, 10499.6, 10504, 10507.1, 10509.6, 10509.4, 10513.5, 10521.8, 10524.7, 10523.9, 10525.9, 10526.1, 10528, 4.14648 4.14551 4.56055 4.14648 6.42676 4.35352 4.35254 4.76758 5.80469 4.56055 5.80469 4.56055 5.59668 4.76758 5.18262 5.80469 4.56055 4.76758 6.42676 5.80469 5.80371 6.63379 4.14648 4.76855 4.35254 5.18262 4.97559 4.35352 4.76758 4.76855 4.97559 4.76758 4.35254 5.80371 3.31641 1.24414 2.4873 1.86621 5.18164 2.07227 2.48828 0.207031 0.830078 0.62207 0 -0.62207 1.03711 2.4873 -1.86621 -0.415039 0 3.31738 4.14551 3.10938 1.4502 2.90234 6.01172 3.11035 3.10938 2.69531 2.28027 4.35352 2.4873 4.14551 2.90234 2.07324 1.86523 i 10540.8, 10542.7, ! 1.86523 10549.3, 10552, ! 2.69531 10552.4, 10555.3, ! 2.90234 10557.4, 10559.9, ! 2.4873 10563.6, 10565.9, ! 2.28027 10572.9, 10574.6, ! 1.6582 10578.3, 10581.2, ! 2.90234 10582.7, 10585.8, ! 3.10938 10585.4, 10589.8, ! 4.35352 10643.4, 10645.6, ! 2.2793 10647.7, 10649.6, ! 1.86621 10650.8, 10652.5, ! 1.6582 10652.9, 10654.7, ! 1.86523 10655.8, 10658.7, ! 2.90137 10749.6, 10749.4, ! -0.208008 10827.8, 10829.5, ! 1.6582 10833.9, 10836.6, ! 2.69531 10840.5, 10842.8, ! 2.28027 10879.1, 10881.6, ! 2.4873 10884.5, 10887.6, ! 3.10938 10887.2, 10890.7, ! 3.52441 10892, 10896.3, ! 4.35254 10918.1, 10921.6, ! 3.52344 10924.1, 10927.2, ! 3.10938 10926.7, 10930, ! 3.31641 10928.5, 10933.1, ! 4.56055 10933.3, 10937, ! 3.73145 10936.2, 10939.7, ! 3.52441 10970.5, 10971.9, ! 1.45117 10976.1, 10981.1, ! 4.97559 11129.1, 11135.3, ! 6.21875 11136.8, 11140.9, ! 4.14551 11148.2, 11154.2, ! 6.01172 11162.9, 11169.7, ! 6.84082 , 11184, 11190.4, ! 6.42676 11186.9, 11194.4, ! 7.46289 11192.3, 11200.4, ! 8.08496 11196, 11202.9, ! 6.84082 11203.7, 11208.5, ! 4.76758 11208.3, 11214.3, ! 6.01172 11213.2, 11218.4, ! 5.18262 11220.4, 11223.1, ! 2.69434 11258, 11264.8, ! 6.84082 11261.9, 11270.6, ! 8.70605 11268.5, 11277.4, ! 8.91406 11271.6, 11280.5, ! 8.91406 11278.2, 11286.7, ! 8.49902 11289.9, 11300.9, ! 10.9863 11298.8, 11309.8, ! 10.9863 11306.2, 11318, ! 11.8164 11331.9, 11345, ! 13.0596 11338.6, 11350.6, ! 12.0234 11342.1, 11353.1, ! 10.9863 11344.4, 11357.4, ! 13.0596 EOZ END ! BASE CURVE: GROH, OFFSET CURVE: GRAX Tape Subfile: 1 289 records... Minimum record length: 10 bytes Maximum record length: 132 bytes **** FILE HEADER **** MWD .001 • 1024 *** INFORMATION TABLE: CONS MNEM VALU ------------------------------------ WDFN 18-13B 5.xtf LCC 150 CN BP Exploration (Alaska) Inc. WN 18-13B APIN FN Prudhoe Bay Unit COUN North Slope STAT Alaska *** LIS COMMENT RECORD *** `J !!!!!!!!!!!!!!!!!!! Remark File Version 1.000 Data presented here is final and has been depth adjusted to a PDC (Primary Depth log provided by Schlumberger GR MCNL dated 07 Dec 2007 per Doug Stoner with BP Exploration (Alaska), Inc. *** INFORMATION TABLE: CIFO MNEM CHAN DIMT CNAM ODEP ---------------------------------------------------- GR GR GRAX 0.0 ROP ROP ROPA 0.0 * FORMAT RECORD (TYPE# 64) Data record type is: 0 Datum Frame Size is: 12 bytes Logging direction is down (value= 255) Optical Log Depth Scale Units: Feet Frame spacing: 0.500000 Frame spacing units: [F ] Number of frames per record is: 84 One depth per frame (value= 0) Datum Specification Block Sub-type is: FRAME SPACE = 0.500 * F ONE DEPTH PER FRAME Tape depth ID: F 2 Curves: Name Tool Code Samples Units 1 GR MWD 68 1 AAPI 2 ROP MWD 68 1 F/HR 1 Size Length 4 4 4 4 8 Total Data Records: 60 Tape File Start Depth = 9050.000000 Tape File End Depth = 11560.000000 Tape File Level Spacing = 0.500000 Tape File Depth Units = feet **** FILE TRAILER **** Tape Subfile: 2 69 records... Minimum record length: 54 bytes Maximum record length: 4124 bytes **** FILE HEADER **** MWD .002 1024 *** INFORMATION TABLE: CONS MNEM VALU -------------------------------- WDFN 18-13B.xtf LCC 150 CN BP Exploration (Alaska) WN 18-13B APIN FN Prudhoe Bay Unit COUN North Slope STAT Alaska *** LIS COMMENT RECORD *** !!!!!!!!!!!!!!!!!!! Remark File Version 1.000 This file contains the raw-unedited field data. *** INFORMATION TABLE: CIFO MNEM CHAN DIMT CNAM ODEP GR GR GRAX 0.0 ROP ROP ROPA 0.0 * FORMAT RECORD (TYPE# 64) Data record type is: 0 Datum Frame Size is: 12 bytes Logging direction is down (value= 255) Optical Log Depth Scale Units: Feet Frame spacing: 0.250000 Frame spacing units: [F ] Number of frames per record is: 84 One depth per frame (value= 0) Datum Specification Block Sub-type is: 1 FRAME SPACE = 0.250 * F ONE DEPTH PER FRAME • Tape depth ID: F 2 Curves: Name Tool Code Samples Units Size Length 1 GR MWD 68 1 AAPI 4 4 2 ROP MWD 68 1 F/HR 4 4 8 Total Data Records: 120 Tape File Start Depth = 9050.000000 Tape File End Depth = 11550.000000 Tape File Level Spacing = 0.250000 Tape File Depth Units = feet **** FILE TRAILER **** Tape Subfile: 3 129 records... Minimum record length: 54 bytes Maximum record length: 4124 bytes **** TAPE TRAILER **** MWD 07/12/03 1643649 O1 **** REEL TRAILER **** MWD 08/07/22 BHI 01 Tape Subfile: 4 2 records... Minimum record length: 132 bytes Maximum record length: 132 bytes • . **** REEL HEADER **** MWD 08/07/22 BHI 01 LIS Customer Format Tape **** TAPE HEADER **** MWD 07/11/13 1643649 O1 3" CTK *** LIS COMMENT RECORD *** !!!!!!!~~!!!!!!~!!! Remark File Version 1.000 !!!!!!!!!!!!!!!!!!! Extract File: ldwg.las Version Information VERS. 1.20: CWLS log ASCII Standard -VERSION 1.20 WRAP. N0: One line per frame Well Information Block #MNEM.UNIT Data Type Information STRT.FT 9090.0000: Starting Depth STOP. FT 10590.0000: Ending Depth STEP. FT 0.5000: Level Spacing NULL. -999.2500: Absent Value COMP. COMPANY: BP Exploration (Alaska), Inc. WELL. WELL: 18-13BPB1 FLD FIELD: Prudhoe Bay Unit LOC LOCATION: 70 deg 17' 51.039"N 148 deg 26' 38.331"W CNTY. COUNTY: North Slope Borough STAT. STATE: Alaska SRVC. SERVICE COMPANY: Baker Hughes INTEQ TOOL. TOOL NAME & TYPE: 3" CTK DATE. LOG DATE: 13 Nov 2007 API API NUMBER: 500292175672 Parameter Information Block #MNEM.UNIT Value #--------- ------------------------- SECT. 19 TOWN.N T11N RANG. R15E PDAT. MSL EPD .F 0 LMF KB FAPD.F 54.80 DMF KB EKB .F 0 EDF .F 54.80 EGL .F 0 CASE.F N/A OS1 DIRECTIONAL Remarks Description Section Township Range Permanent Datum Elevation Of Perm. Datum Log Measured from Feet Above Perm. ,Datum Drilling Measured From Elevation of Kelly Bushing Elevation of Derrick Floor Elevation of Ground Level Casing Depth Other Services Line 1 (1) All depths are Measured Depths (MD) unless otherwise noted. ~U~-t 5~ ~ l Co tS ~ ~ (2) All depths are Bit Depths unless (3) All True Vertical Depths (TVDSS) (4) All Formation Evaluation data is (5) Baker Hughes INTEQ utilized Coil' Advantage otherwise noted. are Subsea corrected. realtime data. Prak downhole tools and the surface system to log this well.. (6) Tools ran in the string included Casing Collar Locator, an Electrical Disconnect and Circulating Sub, a Drilling Performance Sub (Inner and Outer Downhole Pressure, Vibration and Downhole Weight on Bit), a Directional and Gamma Sub, and a Hydraulic Orienting Sub with a Near Bit Inclination Sensor. (7) Data presented here is final and has been depth adjusted to a PDC (Primary Depth Control) log provided by Schlumberger GR MCNL dated 07 Dec 2007 above the KOP (Kick Off Point) of 9660 feet MD per Doug Stoner with BP Exploration (Alaska), Inc. (8) Tied to 18-13A at 9155 feet MD (8237 feet TVDSS). (9) The sidetrack was drilled from 18-13A off the whipstock set at 9200 ft MD (8260 ft TVDSS) through the dual liner. Top of window 9202 ft.MD (8261 ft.TVDSS) Bottom of window 9211 ft.MD (8265 ft.TVDSS) (10) Baker Hughes INTEQ runs 1 and 2 were used to mill. a FasDrill plug and set a retrievable whipstock with KB packer. (11) Baker Hughes INTEQ run 3 was used in a fishing assembly to retieve the whipstock with KB packer. (12) Baker Hughes INTEQ runs 4 and 5 were used to set a whipstock and mill a window. (13) The interval from 10550 feet to 10578 feet MD (8705 feet to 8704 feet TVDSS) was not logged due to sensor to bit offset at well TD. (14) The rate of penetration interval from 9200 feet to 9310 feet MD (8260 feet to 8326 feet TVDSS) was not logged due to an error with the surface system. MNEMONICS: GRAX -> Gamma Ray [MWD] (MWD-API units) ROP_AVG -> Rate of Penetration, feet/hour TVD -> True Vertical Depth (Subsea) CURVE SHIFT DATA BASELINE, MEASURED, DISPLACEMENT 9103.69, 9110.11, ! 6.42578 9106.18, 9111.98, ! 5.80469 9107.21, 9115.09, ! 7.87793 9113.22, 9120.06, ! 6.84082 9116.33, 9121.93, ! 5.59766 9195.92, 9199.86, ! 3.93848 9201.52, 9206.7, ! 5.18262 9210.43, 9215.4, ! 4.97461 9211.67, 9216.86, ! 5.18262 9212.5, 9218.31, ! 5.80469 9221.62, 9226.81, ! 5.18262 9228.26, 9234.68, ! 6.42578 9231.99, 9237.58, ! 5.59668 9237.79, 9243.18, ! 5.38965 9242.97, 9247.54, ! 4.56055 9251.88, 9257.89, ! 6.01172 9256.44, 9262.25,. ! 5.80371 9290.89, 9296.28, ! 5.38965 9292.55, 9297.94, ! 5.38965 9294.83, 9299.81, ! 4.97559 9297.73, 9303.12, ! 5.38965 9300.64, 9306.23, ! 5.59668 9313.43, 9319.44, ! 6.01074 9315.09, 9321.52, ! 6.42578 9317.16, 9323.38, ! 6.21973 • 9321,52, 9326.7, ! 5.18262 9323.8, 9329.6, ! 5.80469 9329.08, 9335.5, ! 6.42578 9332.6, 9337.58, ! 4.97559 9337.99, 9343.8, ! 5.80469 9341.1, 9347.73, ! 6.63281 9342.76, 9348.98, ! 6.21875 9346.8, 9352.6, ! 5.80371 9350.74, 9356.13, ! 5.38965 9354.05, 9360.06, ! 6.01172 9362.97, 9368.77, ! 5.80469 9374.16, 9380.17, ! 6.01074 9428.82, 9433.59, ! 4.76758 9439.19, 9442.71, ! 3.52441 9463.59, 9468.56, ! 4.97461 9465.04, 9470.64, ! 5.59668 9481.36, 9487.99, ! 6.63281 9489.03, 9498.98, ! 9.9502 9502.71, 9507.06, ! 4.35254 9505.82, 9512.25, ! 6.42578 9508.93, 9515.56, ! 6.63379 9511.42, 9517.22, ! 5.80469 9514.53, 9519.71, ! 5.18262 9517.16, 9522.97, ! 5.80469 9520.27, 9525.87, ! 5.59766 9524.83, 9530.84, ! 6.01172 9529.6, 9533.75, ! 4.14551 9533.12, 9538.93, ! 5.80469 9535.4, 9542.04, ! 6.63379 9536.44, 9542.87, ! 6.42578 9539.14, 9544.73, ! 5.59668 9542.04, 9548.05, ! 6.01172 9555.25, 9559.19, ! 3.93848 9557.11, 9560.64, ! 3.52441 9593.85, 9599.03, ! 5.18262 9600.06, 9605.66, ! 5.59766 9605.45, 9610.01, ! 4.56055 9620.38, 9626.18, ! 5.80371 9652.09, 9657.27, ! 5.18262 9653.95, 9659.14, ! 5.18262 9656.03, 9662.25, ! 6.21875 9658.31, 9663.7, ! 5.38965 EOZ END ! BASE CUR VE: GROH, OFFSET CURVE: GRAX Tape Subfile: 1 145 records... Minimum record length: 10 bytes Maximum record length: 132 bytes **** FILE HEADER **** MWD .001 1024 • *** INFORMATION TABLE: CONS MNEM VALU • WDFN 18-13BPB1 5.xtf LCC 150 CN BP Exploration (Alaska) Inc. WN 18-13BPB1 APIN FN Prudhoe Bay Unit COUN North Slope STAT Alaska *** LIS COMMENT RECORD *** !!!!!!!!!!!!!!!!!!! Remark File Version 1.000 Data presented here is final and has been depth adjusted to a PDC (Primary Depth Control) log provided by Schlumberger GR MCNL dated 07 Dec 2007 above the KOP (Kick Off Point) of 9660 feet MD per Doug Stoner with BP Exploration (Alaska), Inc. *** INFORMATION TABLE: CIFO MNEM CHAN DIMT CNAM ODEP ---------------------------------------------------- GR GR GRAX 0.0 ROP ROP ROPA 0.0 * FORMAT RECORD (TYPE# 64) Data record type is: 0 Datum Frame Size is: 12 bytes Logging direction is down (value= 255) Optical Log Depth Scale Units: Feet Frame spacing: 0.500000 Frame spacing units: [F ] Number of frames per record is: 84 One depth per frame (value= 0) Datum Specification Block Sub-type is: 1 FRAME SPACE = 0.500 * F ONE DEPTH PER FRAME Tape depth ID: F 2 Curves: Name Tool Code Samples Units Size Length 1 GR MWD 68 1 AAPI 4 4 2 ROP MWD 68 1 F/HR 4 4 8 Total Data Records: 36 Tape File Start Depth = 9090.000000 Tape File End Depth = 10590.000000 Tape File Level Spacing = 0.500000 Tape File Depth Units = feet **** FILE TRAILER **** Tape Subfile: 2 45 records... Minimum record length: 54 bytes Maximum record length: 4124 bytes • **** FILE HEADER **** MWD .002 1024 *** INFORMATION TABLE: CONS MNEM VALU -------------------------------- WDFN 18-13BPB1.xtf LCC 150 CN BP Exploration (Alaska) WN 18-13BPB1 APIN FN Prudhoe Bay Unit COUN North Slope STAT Alaska *** LIS COMMENT RECORD *** !!!!!!~~~~~!!!!!!!! Remark File Version 1.000 This file contains the raw-unedited field data. *** INFORMATION TABLE: CIFO MNEM CHAN DIMT CNAM ODEP ---------------------------------------------------- GR GR GRAX 0.0 ROP ROP ROPA 0.0 * FORMAT RECORD (TYPE# 64) Data record type is: 0 Datum Frame Size is: 12 bytes Logging direction is down (value= 255) Optical Log Depth Scale Units: Feet Frame spacing: 0.250000 Frame spacing units: [F ] Number of frames per record is: 84 One depth per frame (value= 0) Datum Specification Block Sub-type is: 1 FRAME SPACE = 0.250 * F ONE DEPTH PER FRAME Tape depth ID: F 2 Curves: Name Tool Code Samples Units Size Length 1 GR MWD 68 1 AAPI 4 4 2 ROP MWD 68 1 F/HR 4 4 8 Total Data Records: 71 • • Tape File Start Depth = 9100.000000 Tape File End Depth = 10579.000000 Tape File Level Spacing = 0.250000 Tape File Depth Units = feet **** FILE TRAILER **** Tape Subfile: 3 80 records... Minimum record length: 54 bytes Maximum record length: 4124 bytes **** TAPE TRAILER **** MWD 07/11/13 1643649 01 **** REEL TRAILER **** MWD 08/07/22 BHI O1 Tape Subfile: 4 2 records... Minimum record length: 132 bytes Maximum record length: 132 bytes C~ Tape Subfile 1 is type: LIS • Tape Subfile 2 is type: LIS DEPTH GR ROP 9090.0000 -999.2500 -999.2500 9090.5000 -999.2500 -999.2500 9100.0000 -999.2500 -999.2500 9200.0000 43.0164 -999.2500 9300.0000 159.4395 -999.2500 9400.0000 25.6395 12.6259 9500.0000 22.9434 19.4487 9600.0000 33.2471 21.2032 9700.0000 60.1875 38.1062 9800.0000 77.6281 35.5906 9900.0000 60.2594 42.6656 10000.0000 57.2031 42.9313 10100.0000 63.8281 84.4000 10200.0000 65.8781 96.2250 10300.0000 61.2344 66.8625 10400.0000 67.2156 80.1469 10500.0000 125.7437 275.9344 10590.0000 -999.2500 -999.2500 Tape File Start Depth = 9090.000000 Tape File End Depth = 10590.000000 Tape File Level Spacing = 0.500000 Tape File Depth Units = feet Tape Subfile 3 is type: LIS DEPTH GR ROP 9100.0000 -999.2500 -999.2500 9100.2500 -999.2500 -999.2500 9200.0000 27.6000 -999.2500 9300.0000 39.5000 -999.2500 9400.0000 21.8000 14.8000 9500.0000 21.6000 12.7000 9600.0000 63.3000 31.6000 9700.0000 49.4000 45.1000 9800.0000 66.4000 34.2000 9900.0000 60.2000 42.2000 10000.0000 57.9000 56.7000 10100.0000 57.1000 84.3000 10200.0000 63.0000 95.9000 10300.0000 62.0000 65.9000 10400.0000 109.5000 86.6000 10500.0000 142.6000 64.6000 10579.0000 -999.2500 -999.2500 Tape File Start Depth = 9100.000000 Tape File End Depth = 10579.000000 Tape File Level Spacing = 0.250000 Tape File Depth Units = feet Tape Subfile 4 is type: LIS • • **** REEL HEADER **** MWD 08/07/24 BHI 01 LIS Customer Format Tape **** TAPE HEADER **** MWD 07/11/16 1643649 01 3" CTK *** LIS COMMENT RECORD *** !!!!!!!!!!!!!!!!!!! Remark File Version 1.000 !!!!!!!!!!!!!!!!!!! Extract File: ldwg.las Version Information VERS. 1.20: OWLS log ASCII Standard -VERSION 1.20 WRAP. NO: One line per frame Well Info rmation Block #MNEM.UNIT Data Type Information STRT.FT 9070.0000: Starting Depth STOP.FT 10502.0000: Ending Depth STEP.FT 0.5000: Level Spacing NULL. -999.2500: Absent Value COMP. COMPANY: BP Exploration (Alaska), Inc. WELL. WELL: 18-13BPB2 FLD FIELD: Prudhoe Bay Unit LOC LOCATION: 70 deg 17' 51.039"N 148 deg 26' 38.331"W CNTY. COUNTY: North Slope Borough STAT. STATE: Alaska SRVC. SERVICE COMPANY: Baker Hughes INTEQ TOOL. TOOL NAME & TYPE: 3" CTK DATE. LOG DATE: 16 Nov 2007 API API NUMBER: 500292175673 Parameter Information Block #MNEM.UNIT Value #--------- ------------------------- SECT. 19 TOWN.N T11N RANG. R15E PDAT. MSL EPD . F 0 LMF KB FAPD.F 54.80 DMF KB EKB .F 54.80 EDF . F 0 EGL .F 0 CASE.F N/A OS1 DIRECTIONAL Remarks Description Section Township Range Permanent Datum Elevation Of Perm. Datum Log Measured from Feet Above Perm. Datum Drilling Measured From Elevation of Kelly Bushing Elevation of Derrick Floor Elevation of Ground Level Casing Depth Other Services Line 1 (1) All depths are Measured Depths (MD) unless otherwise noted. (2) All depths are Bit Depths unless otherwise noted. (3) All True Vertical Depths (TVDSS) are Subsea corrected. (4) All Formation Evaluation data is realtime data. (5) Baker Hughes INTEQ utilized CoilTrak downhole tools and the Advantage surface system to log this well.. (6) Tools ran in the string included Casing Collar Locator, an Electrical Disconnect and Circulating Sub, a Drilling Performance Sub (Inner and Outer Downhole Pressure, Vibration and Downhole Weight on Bit), a Directional and Gamma Sub, and a Hydraulic Orienting Sub with a Near Bit Inclination Sensor. (7) Data presented here is final and has been depth adjusted to a PDC (Primary Depth Control) log from well 18-13BPB1 above the KOP (Kick Off Point) of 9970 feet MD per Doug Stoner with BP Exploration (Alaska), Inc. (8) Tied to 18-13A at 9155 feet MD (8237 feet TVDSS). (9) The sidetrack was drilled from 18-13A off the whipstock set at 9200 ft MD (8260 ft TVDSS) through the dual liner. Top of window 9202 ft.MD (8261 ft.TVDSS) Bottom of window 9211 ft.MD (8265 ft.TVDSS) (10) Baker Hughes INTEQ runs 1 and 2 were used to mill a FasDrill plug and set a retrievable whipstock with KB packer. (11) Baker Hughes INTEQ run 3 was used in a fishing assembly to retieve the whipstock with KB packer. (12) Baker Hughes INTEQ runs 4 and 5 were used to set a whipstock and mill a window. (13) Baker Hughes INTEQ run 9 was used to drill 18-13BPB1 to a TD of 10578 feet MD (8704 ft TVDSS). (14) Baker Hughes INTEQ run 10 was used to set an aluminum billet at 10230 feet MD (8699 ft TVDSS). (15) The USR sub was utilized on run 12 although no data is presented due to data processing issues with the downhole tool. (16) The interval from 10471 feet to 10500 feet MD (8788 feet to 8788 feet TVDSS) was not logged due to sensor to bit offset at well TD. (17) The rate of penetration interval from 9200 feet to 9310 feet MD (8260 feet to 8326 feet TVDSS) was not logged due to an error with the surface system. MNEMONICS: GRAX -> Gamma Ray [MWD] (MWD-API units) ROP_AVG -> Rate of Penetration, feet/hour TVD -> True Vertical Depth (Subsea) CURVE SHIFT DATA BASELINE, MEASURED, DISPLACEMENT 9101.47, 9107.89, ! 6.42676 9103.54, 9109.96, ! 6.42578 9105.61, 9112.04, ! 6.42578 9107.06, 9114.73, ! 7.66992 9108.93, 9116.39, ! 7.46289 9113.28, 9120.12, ! 6.84082 9116.39, 9122.2, ! 5.80371 9192.65, 9196.8, ! 9.14648 9195.97, 9199.7, ! 3.73145 9201.36, 9206.13, ! 4.76758 9206.96, 9211.52, ! 4.56055 9209.03, 9213.59, ! 4.56055 9210.69, 9215.66, ! 4.97559 9211.52, 9216.91, ! 5.38965 9212.97, 9218.56, ! 5.59668 9217.94, 9223.12, ! 5.18262 9221.67, 9227.06, ! 5.38965 9228.51, 9234.53, ! 6.01172 9232.25, 9238.05, ! 5.80469 • 9238.15, 9243.33, ! 5.18262 9242.92, 9247.68, ! 4.76758 9252.04, 9258.05, ! 5.01172 9255.98, 9262.2, ! 6.21875 9267.16, 9272.76, ! 5.59766 9282.29, 9287.89, ! 5.59766 9288.31, 9293.99, ! 5.18262 9291.21, 9296.39, ! 5.18262 9292.45, 9297.84, ! 5.39062 9294.73, 9299.71, ! 4.97559 9300.74, 9306.13, ! 5.38965 9311.11, 9316.71, ! 5.59568 9313.6, 9319.61, ! 6.01172 9315.25, 9321.67, ! 6.42578 9317.11, 9323.12, ! 6.01172 9322.09, 9327.48, ! 5.38965 9323.95, 9329.55, ! 5.59766 9326.44, 9332.45, ! 6.01074 9329.86, 9336.08, ! 6.21875 9332.14, 9337.53, ! 5.38965 9334.42, 9339.6, ! 5.18262 9335.45, 9341.05, ! 5.59766 9338.15, 9343.95, ! 5.80371 9341.05, 9347.48, ! 6.42578 9342.71, 9349.14, ! 6.42578 9346.65, 9352.45, ! 5.80371 9350.79, 9356.38, ! 5.59668 9354.1, 9359.91, ! 5.80469 9355.55, 9361.57, ! 6.01172 9363.22, 9368.82, ! 5.59766 9372.55, 9378.56, ! 6.01172 9374.21, 9380.01, ! 5.80371 9376.08, 9382.09, ! 6.01172 9388.72, 9393.9, ! 5.18164 9415.71, 9420.69, ! 4.97559 9425.87, 9430.43, ! 4.56055 9429.19, 9433.54, ! 4.35352 9432.5, 9436.86, ! 4.35352 9439.14, 9442.66, ! 3.52441 9463.64, 9468.61, ! 4.97461 9465.09, 9470.69, ! 5.59668 9481.26, 9487.89, ! 6.63379 9489.14, 9498.88, ! 9.74316 9503.85, 9509.24, ! 5.38965 9505.92, 9512.55, ! 6.63281 9508.41, 9515.25, ! 6.84082 9510.89, 9516.7, ! 5.80469 9514.62, 9520.01, ! 5.38965 9517.11, 9522.92, ! 5.80469 9518.15, 9524.16, ! 6.01172 9520.01, 9525.82, ! 5.80469 9522.29, 9527.89, ! 5.59766 9524.78, 9530.79, ! 6.01172 9526.03, 9531.62, ! 5.59668 9529.34, 9533.49, ! 4.14648 9532.25, 9537.22, ! 4.97559 9533.9, 9539.71, ! 5.80469 9535.55, 9541.98, ! 6.42676 9536.18, 9542.81, ! 6.63379 9539.08, 9544.67, ! 5.59668 9541.98, 9548.2, ! 6.21875 9549.24, 9554.21, ! 4.97559 9555.25, 9558.56, ! 3.31641 9557.32, 9561.05, ! 3.73145 9567.89, 9572.25, ! 4.35254 9593.8, 9598.98, ! 5.18262 9600.22, 9605.61, ! 5.39062 C~ 9603.54, 9608.72, 9605.61, 9610.38, 9607.68, 9612.25, 9620.74, 9626.34, 9647.53, 9652.92, 9652.29, 9657.48, 9653.75, 9659.14, 9656.03, 9662.04, 9658.1, 9663.7, 9660.79, 9665.77, 9663.9, 9669.29, 9665.56, 9670.74, 9668.26, 9673.44, 9670.54, 9675.93, 9673.02, 9678.62, 9675.5, 9680.69, 9677.58, 9683.17, 9680.69, 9686.28, 9686.7, 9692.09, 9689.39, 9694.58, 9693.95, 9699.55, 9698.31, 9703.49, 9701.83, 9707.43, 9705.55, 9710.94, 9712.19, 9717.37, 9721.31, 9726.49, 9724.93, 9730.32, 9730.11, 9735.09, 9732.81, 9738.41, 9752.71, 9757.89, 9756.86, 9762.25, 9760.17, 9765.35, 9772.14, 9777.73, 9775.87, 9781.26, 9779.81, 9784.99, 9781.67, 9787.06, 9782.71, 9788.1, 9788.46, 9793.43, 9794.67, 9800.06, 9796.33, 9801.93, 9805.87, 9811.67, 9810.64, 9816.03, 9825.04, 9830.64, 9829.19, 9834.37, 9835.92, 9841.1, 9837.78, 9843.17, 9843.17, 9848.56, 9848.77, 9853.95, 9863.28, 9868.46, 9867.22, 9872.82, 9877.79, 9883.18, 9883.8, 9889.19, 9887.68, 9893.49, 9898.46, 9903.85, 9954.06, 9959.87, 9961.11, 9966.71, 9967.54, 9972.72, EOZ END ! BASE CURVE: GROH, Tape Subfile: 1 Minimum record length Maximum record length ! 5.18262 ! 4.76758 ! 4.56055 ! 5.59766 ! 5.38965 ! 5.18262 ! 5.38965 ! 6.01172 5.59668 ! 4.97559 ! 5.38965 ! 5.18164 ! 5.18262 ! 5.38965 ! 5.59766 ! 5.18262 ! 5.59668 ! 5.59668 ! 5.38965 ! 5.18262 ! 5.59766 ! 5.18262 ! 5.59668 ! 5.38965 ! 5.18262 ! 5.18262 ! 5.38965 ! 4.97559 ! 5.59668 ! 5.18262 ! 5.38965 ! 5.18262 ! 5.59668 ! 5.38965 ! 5.18262 ! 5.38965 ! 5.38965 ! 4.97559 ! 5.38965 ! 5.59766 ! 5.80371 ! 5.38965 ! 5.59668 ! 5.18262 5.18262 ! 5.38965 ! 5.38965 ! 5.18164 ! 5.18164 ! 5.59668 ! 5.38965 ! 5.38965 ! 5.80469 ! 5.38965 ! 5.80371 ! 5.59668 ! 5.18262 OFFSET CURVE: GRAX 225 records... 10 bytes 132 bytes **** FILE HEADER **** MWD .001 1024 *** INFORMATION TABLE: CONS MNEM VALU ------------------------------------ WDFN 18-13BPB2 5.xtf LCC 150 CN BP Exploration (Alaska) Inc. WN 18-13BPB2 APIN FN Prudhoe Bay Unit COUN North Slope STAT Alaska *** LIS COMMENT RECORD *** !!!!!!!!~~~~~!~~~~! Remark File Version 1.000 Data presented here is final and has been depth adjusted to a PDC (Primary Depth Control) log from well 18-13BPB1 dated 03 Dec 2007 above the KOP (Kick Off Point) of 9970 feet MD per Doug Stoner with BP Exploration (Alaska), Inc. *** INFORMATION TABLE: LIFO MNEM CHAN DIMT CNAM ODEP ---------------------------------------------------- GR GR GRAX 0.0 ROP ROP ROPA 0.0 * FORMAT RECORD (TYPE# 64) Data record type is: 0 Datum Frame Size is: 12 bytes Logging direction is down (value= 255) Optical Log Depth Scale Units: Feet Frame spacing: 0.500000 Frame spacing units: [F ] Number of frames per record is: 84 One depth per frame (value= 0) Datum Specification Block Sub-type is: 1 FRAME SPACE = 0.500 * F ONE DEPTH PER FRAME Tape depth ID: F 2 Curves: Name Tool Code Samples Units Size Length 1 GR MWD 68 1 AAPI 4 4 2 ROP MWD 68 1 F/HR 4 4 8 Total Data Records: 35 Tape File Start Depth = 9070.000000 Tape File End Depth = 10507.000000 Tape File Level Spacing = 0.500000 Tape File Depth Units = feet **** FILE TRAILER **** Tape Subfile: 2 44 records... Minimum record length: 54 bytes Maximum record length: 4124 bytes **** FILE HEADER **** MWD .002 1024 *** INFORMATION TABLE: CONS MNEM VALU -------------------------------- WDFN 18-13BPB2.xtf LCC 150 CN BP Exploration (Alaska) WN 18-13BPB2 APIN FN Prudhoe Bay Unit COUN North Slope STAT Alaska *** LIS COMMENT RECORD *** !!!!!!!!!!!!!!!!!!! Remark File Version 1.000 This file contains the raw-unedited field data. *** INFORMATION TABLE: CIFO MNEM CHAN DIMT CNAM ODEP GR GR GRAX 0.0 ROP ROP ROPA 0.0 * FORMAT RECORD (TYPE# 64) Data record type is: 0 Datum Frame Size is: 12 bytes Logging direction is down (value= 255) Optical Log Depth Scale Units: Feet Frame spacing: 0.250000 Frame spacing units: [F Number of frames per record is: 84 One depth per frame (value= 0) Datum Specification Block Sub-type is: 1 FRAME SPACE = 0.250 * F ONE DEPTH PER FRAME Tape depth ID: F 2 Curves: Name Tool Code Samples Units Size Length 1 GR MWD 68 1 AAPI 4 4 2 ROP MWD 68 1 F/HR 4 4 8 Total Data Records: 69 Tape File Start Depth = 9070.000000 Tape File End Depth = 10501.000000 Tape File Level Spacing = 0.250000 Tape File Depth Units = feet **** FILE TRAILER **** Tape Subfile: 3 78 records... Minimum record length: 54 bytes Maximum record length: 4124 bytes **** TAPE TRAILER **** MWD 07/11/16 1643649 O1 **** REEL TRAILER **** MWD 08/07/24 BHI O1 Tape Subfile: 4 2 records... Minimum record length: 132 bytes Maximum record length: 132 bytes Tape Subfile 1 is type: LIS Tape Subfile 2 is type: LIS DEPTH GR ROP 9070.0000 -999.2500 -999.2500 9070.5000 -999.2500 -999.2500 9100.0000 26.1758 -999.2500 9200.0000 40.9239 -999.2500 9300.0000 159.3660 -999.2500 9400.0000 23.6294 11.7161 9500.0000 22.9700 19.4540 9600.0000 32.8684 21.2148 9700.0000 60.5102 36.6860 9800.0000 77.6120 35.5859 9900.0000 59.9658 42.5355 10000.0000 56.8234 43.1844 10100.0000 61.7609 84.4000 10200.0000 65.8359 95.8875 10300.0000 94.7766 49.4656 10400.0000 84.6953 88.9453 10500.0000 -999.2500 51.7750 10507.0000 -999.2500 -999.2500 Tape File Start Depth = 9070.000000 Tape File End Depth = 10507.000000 Tape File Level Spacing = 0.500000 Tape File Depth Units = feet Tape Subfile 3 is type: LIS DEPTH GR ROP 9070.0000 -999.2500 -999.2500 9070.2500 28.6000 -999.2500 9100.0000 57.4000 -999.2500 9200.0000 27.6000 -999.2500 9300.0000 39.5000 -999.2500 9400.0000 21.8000 14.8000 9500.0000 21.6000 12.7000 9600.0000 63.3000 31.6000 9700.0000 49.4000 45.1000 9800.0000 66.4000 34.2000 9900.0000 60.2000 42.2000 10000.0000 57.9000 56.7000 10100.0000 57.1000 84.3000 10200.0000 63.0000 95.9000 10300.0000 81.8000 60.6000 10400.0000 81.3000 85.7000 10500.0000 -999.2500 47.0000 10501.0000 -999.2500 -999.2500 Tape File Start Depth = 9070.000000 Tape File End Depth = 10501.000000 Tape File Level Spacing = 0.250000 Tape File Depth Units = feet Tape Subfile 4 is type: LIS **** REEL HEADER **** MWD 08/07/24 BHI OI LIS Customer Format Tape **** TAPE HEADER **** MWD 07/11/24 1643649 O1 3" CTK *** LIS COMMENT RECORD *** ~!!!!!!!!!!!!!!!!!! Remark File Version 1.000 !!!!!!!!!!!!!!!!!!! Extract File: ldwg.las Version Information VERS. 1.20: CWLS log ASCII Standard -VERSION 1.20 WRAP. NO: One line per frame Well Information Block #MNEM.UNIT Data Type Information STRT.FT 9190.0000: Starting Depth STOP.FT 12154.0000: Ending Depth STEP.FT 0.5000: Level Spacing NULL. -999.2500: Absent Value COMP. COMPANY: BP Exploration (Alaska), Inc. WELL. WELL: 18-13BPB3 FLD FIELD: Prudhoe Bay Unit LOC LOCATION: 70 deg 17' 51.039"N 148 deg 26' 38.331"W CNTY. COUNTY: North Slope Borough STAT. STATE: Alaska SRVC. SERVICE COMPANY: Baker Hughes INTEQ TOOL. TOOL NAME & TYPE: 3" CTK DATE. LOG DATE: 24 Nov 2007 API API NUMBER: 500292175674 Parameter Information Block #MNEM.UNIT Value SECT. 19 TOWN.N T11N RANG. R15E PDAT. MSL EPD . F 0 LMF KB FAPD.F 54.80 DMF KB EKB .F 54.80 EDF . F 0 EGL .F 0 CASE.F N/A OS1 DIRECTIONAL Remarks Description Section Township Range Permanent Datum Elevation Of Perm. Datum Log Measured from Feet Above Perm. Datum Drilling Measured From Elevation of Kelly Bushing Elevation of Derrick Floor Elevation of Ground Level Casing Depth Other Services Line 1 (1) All depths are Measured Depths (MD) unless otherwise noted. acs--~s~- i~~~~ (2) All depths are Bit Depths unless otherwise noted. (3) All True Vertical Depths (TVDSS) are Subsea corrected. (4) All Formation Evaluation data is realtime data. (5) Baker Hughes INTEQ utilized CoilTrak downhole tools and the Advantage surface system to log this well.. (6) Tools ran in the string included Casing Collar Locator, an Electrical Disconnect and Circulating Sub, a Drilling Performance Sub (Inner and Outer Downhole Pressure, Vibration and Downhole Weight on Bit), a Directional and Gamma Sub, and a Hydraulic Orienting Sub with a Near Bit Inclination Sensor. (7) Data presented here is final and has been depth adjusted to a PDC (Primary Depth Control) log form well 18-13BPB1 above the KOP (Kick Off Point) of 9818 per Doug Stoner with BP Exploration (Alaska), Inc. (8) Tied to 18-13BPB1 at 9951 feet MD (8689 feet TVDSS). (9) The sidetrack was drilled from 18-13A off the whipstock set at 9200 ft MD (8260 ft TVDSS) through the dual liner. Top of window 9202 ft.MD (8261 ft.TVDSS) Bottom of window 9211 ft.MD (8265 ft.TVDSS) (10) Baker Hughes INTEQ runs 1, 5 and 9 were used to set a whipstock, mill, fish and drill 18-13BPB1. (11) Baker Hughes INTEQ runs 10 through 13 were used to set a billet, mill and drill 18-13BPB2. (12) Baker Hughes INTEQ runs 14 and 15 were used to set a billet and mill for 18-13BPB3. (13) The open hole sidetrack was drilled from 9970 ft MD (8690 ft TVDSS) from 18-13PB1 off of an aluminum billet. (14) The rate of penetration interval from 9200 ft to 9310 ft MD (8260 ft to 8326 ft TVDSS) was not logged due to an error with the surface system. (15) The interval f rom 12114 feet to 12152 feet MD (8693 feet to 8695 feet TVDSS) was n ot logged due to sensor to bit offset at well TD. MNEMONICS: GRAX -> Gamma Ray [MWD] (MWD-API units) ROP AVG -> Rate of Penetration, feet/hour _ TVD -> True Vertical Depth (Subsea) CURVE SHIFT DATA BASELINE, MEASURED, DISPLACEMENT 9101.47, 9107.89, ! 6.42676 9103.54, 9109.96, ! 6.42578 9105.61, 9112.04, ! 6.42578 9107.06, 9114.73, ! 7.66992 9108.93, 9116.39, ! 7.46289 9113.28, 9120.12, ! 6.84082 9116.39, 9122.2, ! 5.80371 9192.65, 9196.8, ! 4.14648 9195.97, 9199.7, ! 3.73145 9201.36, 9206.13, ! 4.76758 9206.96, 9211.52, ! 4.56055 9209.03, 9213.59, ! 4.56055 9210.69, 9215.66, ! 4.97559 9211.52, 9216.91, ! 5.38965 9212.97, 9218.56, ! 5.59668 9217.94, 9223.12, ! 5.18262 9221.67, 9227.06, ! 5.38965 9228.51, 9234.53, ! 6.01172 9232.25, 9238.05, ! 5.80469 9238.15, 9243.33, ! 5.18262 9242.92, 9247.68, ! 4.76758 9252.04, 9258.05, ! 6.01172 9255.98, 9262.2, ! 6.21875 9267.16, 9272.76, ! 5.59766 9282.29, 9287.89, ! 5.59766 9288.31, 9293.49, ! 5.18262 9291.21, 9296.39, ! 5.18262 9292.45, 9297.84, ! 5.39062 9294.73, 9299.71, ! 4.97559 9300.74, 9306.13, ! 5.38965 9311.11, 9316.71, ! 5.59668 9313.6, 9319.61, ! 6.01172 9315.25, 9321.67, ! 6.42578 9317.11, 9323.12, ! 6.01172 9322.09, 9327.48, ! 5.38965 9323.95, 9329.55, ! 5.59766 9326.44, 9332.45, ! 6.01074 9329.86, 9336.08, ! 6.21875 9332.14, 9337.53, ! 5.38965 9334.42, 9339.6, ! 5.18262 9335.45, 9341.05, ! 5.59766 9338.15, 9343.95, ! 5.80371 9341.05, 9347.48, ! 6.42578 9342.71, 9349.14, ! 6.42578 9346.65, 9352.45, ! 5.80371 9350.79, 9356.38, ! 5.59668 9354.1, 9359.91, ! 5.80469 9355.55, 9361.57, ! 6.01172 9363.22, 9368.82, ! 5.59766 9372.55, 9378.56, ! 6.01172 9374.21, 9380.01, ! 5.80371 9376.08, 9382.09, ! 6.01172 9388.72, 9393.9, ! 5.18164 9415.71, 9420.69, ! 4.97559 9425.87, 9430.43, ! 4.56055 9429.19, 9433.54, ! 4.35352 9432.5, 9436.86, ! 4.35352 9439.14, 9442.66, ! 3.52441 9463.64, 9468.61, ! 4.97461 9465.09, 9470.69, ! 5.59668 9481.26, 9487.89, ! 6.63379 9489.14, 9498.88, ! 9.74316 9503.85, 9509.24, ! 5.38965 9505.92, 9512.55, ! 6.63281 9508.41, 9515.25, ! 6.84082 9510.89, 9516.7, ! 5.80469 9514.62, 9520.01, ! 5.38965 9517.11, 9522.92, ! 5.80469 9518.15, 9524.16, ! 6.01172 9520.01, 9525.82, ! 5.80469 9522.29, 9527.89, ! 5.59766 9524.78, 9530.79, ! 6.01172 9526.03, 9531.62, ! 5.59668 9529.34, 9533.49, ! 4.14648 9532.25, 9537.22, ! 4.97559 9533.9, 9539.71, ! 5.80469 9535.55, 9541.98, ! 6.42676 9536.18, 9542.81, ! 6.63379 9539.08, 9544.67, ! 5.59668 9541.98, 9548.2, ! 6.21875 9549.24, 9554.21, ! 4.97559 9555.25, 9558.56, ! 3.31641 9557.32, 9561.05, ! 3.73145 9567.89, 9572.25, ! 4.35254 9593.8, 9598.98, ! 5.18262 9600.22, 9605.61, ! 5.39062 9603.54, 9608.72, ! 5.18262 9605.61, 9610.38, ! 4.76758 9607.68, 9612.25, ! 4.56055 9620.74, 9626.34, ! 5.59766 9647.53, 9652.92, ! 5.38965 9652.29, 9657.48, ! 5.18262 9653.75, 9659.14, ! 5.38965 9656.03, 9662.04, ! 6.01172 9658.1, 9663.7, ! 5.59668 9660.79, 9665.77, ! 4.97559 9663.9, 9669.29, ! 5.38965 9665.56, 9670.74, ! 5.18164 9668.26, 9673.44, ! 5.18262 9670.54, 9675.93, ! 5.38965 9673.02, 9678.62, ! 5.59766 9675.5, 9680.69, ! 5.18262 9677.58, 9683.17, ! 5.59668 9680.69, 9686.28, ! 5.59668 9686.7, 9692.09, ! 5.38965 9689.39, 9694.58, ! 5.18262 9693.95, 9699.55, ! 5.59766 9698.31, 9703.49, ! 5.18262 9701.83, 9707.43, ! 5.59668 9705.55, 9710.94, ! 5.38965 9712.19, 9717.37, ! 5.18262 9721.31, 9726.49, ! 5.18262 9724.93, 9730.32, ! 5.38965 9730.11, 9735.09, ! 4.97559 9732.81, 9738.41, ! 5.59668 9752.71, 9757.89, ! 5.18262 9756.86, 9762.25, ! 5.38965 9760.17, 9765.35, ! 5.18262 9772.14, 9777.73, ! 5.59668 9775.87, 9781.26, ! 5.38965 9779.81, 9784.99, ! 5.18262 9781.67, 9787.06, ! 5.38965 9782.71, 9788.1, ! 5.38965 9788.46, 9793.43, ! 4.97559 9794.67, 9800.06, ! 5.38965 9796.33, 9801.93, ! 5.59766 9805.87, 9811.67, ! 5.80371 9810.64, 9816.03, ! 5.38965 9825.04, 9830.64, ! 5.59668 9829.19, 9834.37, ! 5.18262 9835.92, 9841.1, ! 5.18262 9837.78, 9843.17, ! 5.38965 9843.17, 9848.56, ! 5.38965 9848.77, 9853.95, ! 5.18164 9863.28, 9868.46, ! 5.18164 9867.22, 9872.82, ! 5.59668 9877.79, 9883.18, ! 5.38965 9883.8, 9889.19, ! 5.38965 9887.68, 9893.49, ! 5.80469 9898.46, 9903.85, ! 5.38965 9943.95, 9949.14, ! 5.18262 EOZ END ! BASE CUR VE: GROH, OFFSET CURVE: GRAX Tape Subfile: 1 220 records... Minimum record length: 10 bytes Maximum record length: 132 bytes **** FILE HEADER **** MWD .001 1024 n *** INFORMATION TABLE: CONS MNEM VALU WDFN 18-13BPB3 5.xtf LCC 150 CN BP Exploration (Alaska) Inc. WN 18-13BPB3 APIN FN Prudhoe Bay Unit COUN North Slope STAT Alaska *** LIS COMMENT RECORD *** !!!!!!!!!!~!!~~~!~! Remark File Version 1.000 Data presented here is final and has been depth adjusted to a PDC (Primary Depth Control) log from well 18-13BPB1 dated 03 Dec 2007 above the KOP (Kick Off Point) of 9818 feet MD per Doug Stoner with BP Exploration (Alaska), Inc. *** INFORMATION TABLE: CIFO MNEM CHAN DIMT CNAM ODEP GR GR GRAX 0.0 ROP ROP ROPA 0.0 * FORMAT RECORD (TYPE# 64) Data record type is: 0 Datum Frame Size is: 12 bytes Logging direction is down (value= 255) Optical Log Depth Scale Units: Feet Frame spacing: 0.500000 Frame spacing units: [F ] Number of frames per record is: 84 One depth per frame (value= 0) Datum Specification Block Sub-type is: FRAME SPACE = 0.500 * F ONE DEPTH PER FRAME Tape depth ID: F 2 Curves: Name Tool Code Samples Units 1 GR MWD 68 1 AAPI 2 ROP MWD 68 1 F/HR 1 Size Length 4 4 4 4 8 Total Data Records: 71 Tape File Start Depth = 9190.000000 Tape File End Depth = 12154.000000 Tape File Level Spacing = 0.500000 Tape File Depth Units = feet **** FILE TRAILER **** Tape Subfile: 2 80 records... Minimum record length: 54 bytes Maximum record length: 4124 bytes **** FILE HEADER **** MWD .002 1024 *** INFORMATION TABLE: CONS MNEM VALU WDFN 18-13BPB3.xtf LCC 150 CN BP Exploration (Alaska) WN 18-13BPB3 APIN FN Prudhoe Bay Unit COUN North Slope STAT Alaska *** LIS COMMENT RECORD *** !!!!!!!!!!!!!!!!!!! Remark File Version 1.000 This file contains the raw-unedited field data. *** INFORMATION TABLE: CIFO MNEM CHAN DIMT CNAM ODEP GR GR GRAX 0.0 ROP ROP ROPA 0.0 * FORMAT RECORD (TYPE# 64) Data record type is: 0 Datum Frame Size is: 12 bytes Logging direction is down (value= 255) Optical Log Depth Scale Units: Feet Frame spacing: 0.250000 Frame spacing units: [F ] Number of frames per record is: 84 One depth per frame (value= 0) Datum Specification Block Sub-type is: 1 FRAME SPACE = 0.250 * F ONE DEPTH PER FRAME Tape depth ID: F 2 Curves: Name Tool Code Samples Units Size Length 1 GR MWD 68 1 AAPI 2 ROP MWD 68 1 F/HR Total Data Records: 142 Tape File Start Depth = 9190.000000 Tape File End Depth = 12153.000000 Tape File Level Spacing = 0.250000 Tape File Depth Units = feet **** FILE TRAILER **** Tape Subfile: 3 151 records... Minimum record length: 54 bytes Maximum record length; 4124 bytes **** TAPE TRAILER **** MWD 07/11/24 1643649 O1 **** REEL TRAILER **** MWD 08/07/24 BHI 01 Tape Subfile: 4 2 records... Minimum record length: 132 bytes Maximum record length: 132 bytes 4 4 4 4 8 r ~ ~ Tape Subfile 1 is type: LIS Tape Subfile 2 is type: LIS DEPTH GR ROP 9190.0000 -999.2500 -999.2500 9190.5000 -999.2500 -999.2500 9200.0000 40.9239 -999.2500 9300.0000 159.3660 -999.2500 9400.0000 23.6294 11.7161 9500.0000 22.9700 19.4540 9600.0000 32.8684 21.2148 9700.0000 60.5102 36.6860 9800.0000 77.6120 35.5859 9900.0000 59.9658 42.5355 10000.0000 90.4937 83.8895 10100.0000 117.7433 83.5242 10200.0000 67.5664 75.0590 10300.0000 35.2863 77.1590 10400.0000 66.4430 82.2727 10500.0000 56.4570 67.7109 10600.0000 65.7906 70.2832 10700.0000 76.3410 112.8633 10800.0000 197.1910 84.3559 10900.0000 70.9355 90.3758 11000.0000 72.5410 77.3832 11100.0000 60.9105. 92.0547 11200.0000 66.9758 76.6863 11300.0000 73.0621 83.1105 11400.0000 66.7949 84.6641 11500.0000 61.2664 112.0473 11600.0000 60.4684 118.5125 11700.0000 59.0191 41.6352 11800.0000 49.5547 33.6832 11900.0000 59.2969 115.5863 12000.0000 63.1242 66.3242 12100.0000 63.8621 76.4168 12154.0000 -999.2500 70.9543 Tape File Start Depth = 9190.000000 Tape File End Depth = 12154.000000 Tape File Level Spacing = 0.500000 Tape File Depth Units = feet • Tape Subfile 3 is type: LIS DEPTH GR ROP 9190.0000 -999.2500 -999.2500 9190.2500 -999.2500 -999.2500 9200.0000 27.6000 -999.2500 9300.0000 39.5000 -999.2500 9400.0000 21.8000 14.8000 9500.0000 21.6000 12.7000 9600.0000 63.3000 31.6000 9700.0000 49.4000 45.1000 9800.0000 66.4000 34.2000 9900.0000 60.2000 42.2000 10000.0000 80.3000 85.5000 10100.0000 137.0000 95.7000 10200.0000 68.4000 70.0000 10300.0000 42.6000 78.7000 10400.0000 90.0000 81.5000 10500.0000 52.8000 64.5000 10600.0000 63.5000 54.5000 10700.0000 75.6000 105.7000 10800.0000 131.1000 87.2000 10900.0000 70.0000 87.4000 11000.0000 70.8000 76.7000 11100.0000 65.0000 97.6000 11200.0000 68.0000 96.0000 11300.0000 71.5000 81.5000 11400.0000 64.3000 90.3000 11500.0000 63.3000 108.4000 11600.0000 60.1000 117.7000 11700.0000 64.7000 64.5000 11800.0000 53.0000 60.5000 11900.0000 76.6000 87.9000 12000.0000 71.5000 64.4000 12100.0000 61.1000 54.0000 12153.0000 -999.2500 -999.2500 Tape File Start Depth = 9190.000000 Tape File End Depth = 12153.000000 Tape File Level Spacing = 0.250000 Tape File Depth Units = feet r~ Tape Subfile 4 is type: LIS