Department of Commerce, Community, and Economic Development
Alaska Oil and Gas Conservation
Commission
HOME
EVENTS
DATA
Data List
Drilling
Production
Orders
Data Miner
Document Search
REPORTS
Reports and Charts
Pool Statistics
FORMS
LINKS
Links
Test Notification
Data Requests
Regulations
Industry Guidance Bulletins
How to Apply
ABOUT US
History
Staff
HELP
Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
209-150
New Plugback Esets 7/24/2024 Well Name API Number PTD Number ESet Number Date CRU CD4-25 PB1 50-103-20608-70-00 209-150 T39276 2-6-2010 KRU 2T-29AL1-01 PB1 50-103-20222-70-00 209-138 T39277 4-6-2010 Nuna 1 PH 50-103-20645-70-00 211-155 T39278 4-18-2012 PBU 18-27D PB1 50-029-22321-70-00 205-133 T39279 10-26-2007 CRU CD4-25 PB1 50-103-20608-70-00 209-150 T39276 2-6-2010 • • Image Project Well History File Cover Page XHVZE This page identifies those items that were not scanned during the initial production scanning phase. They are available in the original file, may be scanned during a special rescan activity or are viewable by direct inspection of the file. 1 Qo i - 5T Well History File Identifier Organizing (done) ❑ Two - sided III 111111 I III I III ❑ Rescan Needed III 111111 1 III RESCAN DIGITAL DATA OVERSIZED (Scannable) irzolor Items: ❑ Diskettes, No. ❑ Maps: ' reyscale Items: /Other, No/Type: 0 Na • 1 ❑ Other Items Scannable by a Large Scanner ❑ Poor Quality Originals: OVERSIZED (Non - Scannable) ❑ Other: ❑ Logs of various kinds: NOTES: ❑ Other:: BY: Maria Date: 41 / 3 /s/ YY P Project Proofing II 111111 I BY: Maria Date: D_ o 13 /s/ Scanning Preparation x 30 = /0 + asp = TOTAL PAGES a,3° (Count does not include cover sheet) BY: ��- �j Date: I 3 /s/ Production Scanning N11111111111 Stage 1 Page Count from Scanned File: I (Count does Preparation: include cover eet) YES NO Page Count Matches Number in Scanning p t BY: ` Date: a_./ /3 /s/ i441° Stage 1 If NO in stage 1, page(s) discrepancies were found: YES NO BY: Maria Date: /s/ Scanning is complete at this point unless rescanning is required. 111 I ReScanned IA1111111111 BY: Maria Date: /s/ Comments about this file: Quality Checked H111111111111 10/6/2005 Well History File Cover Page.doc DATA SUBMITTAL COMPLIANCE REPORT 8/8/2012 Permit to Drill 2091500 Well Name /No. COLVILLE RIV UNIT CD4 -25 Operator CONOCOPHILLIPS ALASKA INC API No. 50- 103 - 20608 -00 -00 MD 21168 TVD 7576 Completion Date 11/11/2010 Completion Status 1 -OIL Current Status 1 -OIL UIC N REQUIRED INFORMATION Mud Log No Samples No Directional Survey Yes DATA INFORMATION Types Electric or Other Logs Run: GR / RES (data taken from Logs Portion of Master Well Data Maint Well Log Information: III Log/ Electr Data Digital Dataset Log Log Run Interval OH / Type Med /Frmt Number Name Scale Media No Start Stop CH Received Comments Rpt. LIS Verification 2848 21168 Open 12/6/2010 ED ''CLis 20474 Induction /Resistivity 2848 21168 Open 12/6/2010 OH LIS RPS, FET, RPM, RPD, GR, RPX, NCNT, DRHO, FCNT, RHOB, ROP Plus PB 1 (2948 - 16011) Plus EMF, PDF, & CGM Graphics Rpt LIS Verification 2948 16011 Open 12/6/2010 PB1 Log 7— Induction /Resistivity 25 Col 114 7576 Open 12/6/2010 TVD DGR, EWR, ALD, CTN, BAT Log Induction /Resistivity 25 Col 114 21168 Open 12/6/2010 MD DGR, EWR, ALD, CTN Log / Induction /Resistivity 25 Col 114 21168 Open 12/6/2010 MD DGR, EWR, ALD, CTN, BAT Log / Induction /Resistivity 25 Col 114 21168 Open 12/6/2010 TVD DGR, EWR, ALD, III CTN Invert/Revert Log / Induction /Resistivity 25 Col 114 16015 Open 12/6/2010 PB1 MD DGR, EWR, ALD, CTN Log Induction /Resistivity 25 Col 114 7473 Open 12/6/2010 PB1 TVD DGR, EWR, ALD, CTN Log" Induction /Resistivity 25 Col 114 16015 Open 12/6/2010 PB1 MD DGR, EWR, ALD, CTN, BAT Log / Induction /Resistivity 25 Col 114 7473 Open 12/6/2010 PB1 TVD DGR, EWR, ALD, CTN, BAT Rpt c .. Directional Survey 36 21168 Open 8/24/2011 Rpt -''� Directional Survey 36 16015 Open 8/24/2011 PB 1 1 Eq./ C Asc Directional Survey 36 21168 Open 8/24/2011 ED C/C Asc Directional Survey 36 16015 Open 8/24/2011 PB 1 DATA SUBMITTAL COMPLIANCE REPORT 8/8/2012 Permit to Drill 2091500 Well Name /No. COLVILLE RIV UNIT CD4 -25 Operator CONOCOPHILLIPS ALASKA INC API No. 50- 103 - 20608 -00 -00 MD 21168 TVD 7576 Completion Date 11/11/2010 Completion Status 1 -OIL Current Status 1 -OIL UIC N Well Cores /Samples Information: Sample Interval Set Name Start Stop Sent Received Number Comments ADDITIONAL INFORMATION //; Well Cored? Y is Daily History Received? O Chips Received ? -44 -4ID Formation Tops N Analysis Y.LII— Rece ived? Comments: Compliance Reviewed By: _ Date: • • • Halliburton Sperry Drilling 6900 Arctic Blvd Anchorage, AK 99518 January 13, 2011 AOGCC Christine Mahnken 333 W. 7 Ave., Suite 100 Anchorage, AK 99501 Dear Sir or Madam: Subject: CD4 -25 / CD4 -25PB1 / CD4 -25L1 Definitive Survey Reports Enclosed are two hard copies (NAD83 and NAD27) of the definitive well path. Also enclosed is a disc containing an electronic export of the survey data. Please acknowledge receipt by sending an email to Avinash.Ramjit @Halliburton.com or by signing and returning a copy of this letter to the following address: Halliburton Sperry Drilling ATTN: Avinash Ramjit 6900 Arctic Blvd Anchorage, AK 9 18 011 Received by: Date: q4 AO( I Please contact me at 907.748.3919 with questions or concerns. Regards, Avinash Ramjit tab STATE OF ALASKA • ALASKA OIL AND GAS CONSERVATION COMMISSION WELL COMPLETION OR RECOMPLETION REPORT AND LOG la. Well Status: Oil Q Gas ❑ SPLUG ❑ Other ❑ Abandoned ❑ Suspended ❑ 1b. Well Class: 20AAC 25.105 20AAC 25.110 Development 0 Exploratory ❑ GINJ ❑ WINJ ❑ WAG ❑ WDSPL ❑ No. of Completions: Service ❑ Stratigraphic Test 2. Operator Name: 5. Date Comp., Susp., 12. Permit to Drill Number: ConocoPhillips Alaska, Inc. orAband.: November 11, 2010 209 - 150 / 3. Address: 6. Date Spudded: 13. API Number: P. O. Box 100360, Anchorage, AK 99510 - 0360 September 9, 2010 50 103 - 20608 - 00, 50 103 - 20608 - 70 4a. Location of Well (Governmental Section): 7. Date TD Reached: 14. Well Name and Number: Surface: 2277' FSL, 535' FEL, Sec. 24, T11N, R4E, UM October 18, 2010 CD4 - 25 / CD4 - 25PB1 Top of Productive Horizon: 8. KB (ft above MSL): 55.4' RKB 15. Field /Pool(s): 1014' FSL, 1144' FWL, Sec. 26, T11N, R4E, UM GL (ft above MSL): . 19' AMSL Colville River Field Total Depth: 9. Plug Back Depth (MD + TVD): 943' FNL, 495' FEL, Sec. 27, T11N, T4E, UM 21160' MD / 7575' TVD Alpine Oil Pool 4b. Location of Well (State Base Plane Coordinates, NAD 27): 10. Total Depth (MD + TVD): 16. Property Designation: Surface: x 377707 y 5957414 Zone 4 21168' MD / 7576' TVD ADL 380077, 388902, 387209, 387208 TPI: x - 368723 y - 5951021 Zone 4 11. SSSV Depth (MD + TVD): 17. Land Use Permit: Total Depth: x 367138 y - 5954373 Zone 4 2264' MD / 2036' TVD 380077 18. Directional Survey: Yes isi No ❑ 19. Water Depth, if Offshore: 20. Thickness of Permafrost MD/TVD: (Submit electronic and printed information per 20 AAC 25.050) N/A (ft MSL) 1587' MD / 1555' TVD 21. Logs Obtained (List all logs here and submit electronic and printed information per 20 AAC 25.071): X 22. Re drill /Lateral Top Window MD/TVD GR/Res not applicable 23. CASING, LINER AND CEMENTING RECORD SETTING DEPTH MD SETTING DEPTH TVD HOLE AMOUNT CEMENTING RECORD 1 CASING SIZE WT. PER FT. GRADE TOP BOTTOM TOP BOTTOM SIZE PULLED 16" 62.5# H-40 36' 114' 36' 114' 24" Portland III 10.75" 45.5# L - 36' 2958', 36' 2393' 13.5" 595 sx Class G, 285 sx Class G 7.625" 29.7# L -80 36' 16784' 36' 7526' 9.875" 1458 sx Class G, 280 sx Class G 4.5" 12.6# L -80 16577' 21160' 7501' 7575' 6.75" slotted liner 24. Open to production or injection? Yes • No ❑ If Yes, list each 25. TUBING RECORD Interval open (MD +TVD of Top & Bottom; Perforation Size and Number): SIZE DEPTH SET (MD) PACKER SET (MD/TVD) 4.5" / 3.5" 15411' / 16619' 16577' MD / 7501' TVD • slotted liner from 17566- 21066' MD 7596' -7567' TVD 16417' MD / 7368' TVD 26. ACID, FRACTURE, CEMENT SQUEEZE, ETC. 1.(A " DEPTH INTERVAL (MD) AMOUNT AND KIND OF MATERIAL USED ` ._ kiement plug #1 12994'- 13568' 305 sx 17.0 ppg Class G ( , i cement plug #2 14384' - 14805' 193 sx Class G 27. PRODUCTION TEST Date First Production Method of Operation (Flowing, gas lift, etc.) November 21, 2010 gas lift oil Date of Test Hours Tested Production for OIL - BBL GAS - MCF WATER - BBL CHOKE SIZE GAS - OIL RATIO 12/1/2010 12 hours Test Period - -> 2430 1845 4 100% 990 Flow Tubing Casing Pressure Calculated OIL - BBL GAS - MCF WATER - BBL OIL GRAVITY - API (corr) - Press. 405 psi not available 24 - Hour Rate - 4567 4523 8 not available 28. CORE DATA Conventional Core(s) Acquired? Yes ❑ No Q Sidewall Cores Acquired? Yes ❑ No Q If Yes to either question, list formations and intervals cored (MD +TVD of top and bottom of each), and summarize lithology and presence of oil, gas or water (Submit separate sheets with this form, if needed). Submit detailed descriptions, core chips, photographs and laboratory analytical results per 20 AAC . C .JVED NONE DEC 0 9 2010 RBDMS DEC 0 9 IMO- 4tasi;a Wt 1,4. is Cons. Comnissio t Anchorage Form 10 -407 Revised 12/2009 CONTINUED ON REVERSE / • Submit original only �y /�/ /� I � /� <t/ � L -i 28. GEOLOGIC MARKERS (List all formations and marke 29. FORMATION TESTS NAME MD TVD Well tested? ❑ Yes 0 No If yes, list intervals and formations tested, Permafrost - Top ground surface ground surface briefly summarizing test results. Attach separate sheets to this form, if Permafrost - Bottom 1587' 1555' needed, and submit detailed test information per 20 AAC 25.071. Nanuk 11886' 6224' Kuparuk C 14637' 6198' Alpine D 16343' 7473' Alpine C 16417' 7482' Alpine A 17452' 7590' CD4 -25 PB1 total depth 16015' 7473' N/A Formation at total depth: Alpine A 30. LIST OF ATTACHMENTS Summary of Daily Operations, schematic, directional surveys 31. I hereby certify that the foregoing is true and correct to the best of my knowledge. Contact: Mi Wi free 454820 820 i ZrtiZe. s.,. Printed Nam n om.. L. Alvord Title: Alaska Drilling Manager / j Signature .? tr.;/C. Phone 265 - 6120 Date ( �-i �' ` 2 ' I Sharon Allsup -Drake INSTRUCTIONS General: This form is designed for submitting a complete and correct well completion report and log on all types of lands and leases in Alaska. Submit a well schematic diagram with each 10 -407 well completion report and 10-404 well sundry report when the downhole well design is changed. Item la: Classification of Service wells: Gas injection, water injection, Water - Alternating -Gas Injection, Salt Water Disposal, Water Supply for Injection, Observation, or Other. Multiple completion is defined as a well producing from more than one pool with production from each pool completely segregated. Each segregated pool is a completion. Item 4b: TPI (Top of Producing Interval). Item 8: The Kelly Bushing and Ground level elevations in feet above mean sea level. Use same as reference for depth measurements given in other spaces on this form and in any attachments. Item 13: The API number reported to AOGCC must be 14 digits (ex: 50- 029 - 20123- 00 -00). Item 20: Report true vertical thickness of permafrost in Box 20. Provide MD and TVD for the top and base of permafrost in Box 28. Item 22: Attached supplemental records for this well should show the details of any multiple stage cementing and the location of the cementing tool. Item 23: If this well is completed for separate production from more than one interval (multiple completion), so state in item 1, and in item 23 show the producing intervals for only the interval reported in item 26. (Submit a separate form for each additional interval to be separately produced, showing the data pertinent to such interval). Item 26: Method of Operation: Flowing, Gas Lift, Rod Pump, Hydraulic Pump, Submersible, Water Injection, Gas Injection, Shut -in, or Other (explain). Item 27: Provide a listing of intervals cored and the corresponding formations, and a brief description in this box. Submit detailed description and analytical laboratory information required by 20 AAC 25.071. Item 29: Provide a list of intervals tested and the corresponding formation, and a brief summary of this box. Submit detailed test and analytical laboratory information required by 20 AAC 25.071. Form 10 -407 Revised 12/2009 ill WNS • CD4 -25 Iv ConocoPhilhp5 Well Attnb Max Angle & MD TD Al , „;, .., it .„ '',4.,'.'t "k +: to Wel!bore API/UWI Field Name Well Status Inc' ( ") MD (ftKB) Act Bbn (ftKB) CRaeK,,,„,,,,,, 501032060800 ALPINE PROD 1 9462 I 20,73725 21,1680 "" Comment IH2S (ppm) Date Annotation End Date IKB -Grd (ft) Rig Release Date - Well Conlig: HORIZONTAL - ,004.25, 11/2&2510 PM SSSV: NIPPLE La St WO: .. __ 0c980400c Actual_ - } 4306 11/12/2010 -t Imosb 1/26/ Annotation Last Mod .. End Date Last z Annotation Rev Reason: NEW WELL or 12010 Hn NGER, 3,- Casin g Depth /f tKB) En d Date Strings Casing Description String 0... String ID ... Top (ftKB) Set Depth (i_. Set Depth (TVD) .. String Wt... String .. String Top Thrd 111i e . CONDUCTOR 16 15.250 36.4 114 -0 114.0 62.50 1-1-00 Welded 6 ; Insulated 42" . . -::. D Inw 'ated a2' - -- ,„ Casing Description String 0... String ID ... Top (ftKB) Set Depth (f... Set Depth (ND) ... String Wt... String ... String Top Thrd 36 - SURFACE 10 3/4 9.950 36.5 2,957.8 2.392.9 45.50 L-80 BTCM SEEVE,2,264 - � . NIPPLE, 2,2s3� --- -- - - Cuing Description String 0... String ID ... Top (HKB) Set Depth (f... Set Depth (ND) ... String Wl... String ... String Top Thrd INTERMEDIATE 75/8 6.875 34.2 16784.7 7,526.3 29.70 L -80 BTCM _--_ - - Casing Description String 0... String ID .. Top (ftKB) Set Depth (i... Set Depth (TVD) ... String Wt... String ... String Top Thrd 1 ASAND LINE 41/2 3993 �169765 21160.4 7,575.4 12.60 L80 IBT URFACE, 1ner Details S 37 -2,958 -- - Top Depth: : I (ND) Top Intl N i... ' To (ftKB) (ftKB) ( °) itemDescion Comment ___ ID (in) GAS LIFT, Allt111. 16,576 - 5 7,501.7 82.72 PACKER "HRD" ZXP Liner Top Packer w/ HD Seal Bore Extension 5.750 5.066 '` 16,595.5 7,504.0 82.86 NIPPLE RS Packoff Seal Nipple 4.880 16,598.4 7504.4 82 -88 HANGER 7 5/8" Flex -Lock Hanger 4.830 16,617.6 7,506 7 83.02 SBR ANCHOR RECEPTACLE 5 'h" TKC Box by 4 7" IBT Pin (1.10' No Go) 3.080 77,465.0 7,590 8 85.86 Swell Packer 4 W, IBT, TAM Swell Packer w/ Torque Rings 4.970 GAS OI3 Tubing Strings �' Tubing Description String O .. String ID ... Top (ftKB) Set Depth (f . Set Depth (ND) . !String Wt... String String Top Thrd I USING Upper 41/2 I 3.958 I 30.9 I 15,410.7 7,367.0 I 1260 I L-80 i IBT GAS LIFT, ). Completion Details 13,244 To Depth i, (TVD) Top lnol Nomi... , emu, Top (ftKB) (NKB) ( °) Kern Description ..__- Comment ID (in) NIPPLE, 13,346 30.9 30.9 -0.02 HANGER FMC 11" x41/2" TUBING HANGER (10.85" 00) w/2.63' pup it 3.958 2,263.5 2,036.1 52.02 NIPPLE 4 1/2" Cameo BAL-0 NIPPLE 3.812 DB profile 3.812 13,346.3 6,800.3 65.90 NIPPLE 4 -1/2" HES "XN" NIPPLE (3.725' Min. ID) 3.812 15,359.3 7,361.5 83.81 XO - Reducing XO - 4 h" IBTM Box by 3'h" EUE Pin 3.625 SEAL ASSY, 15,399 15,398.7 7,365.7 83.76 SEAL ASSY L LOCATOR /SEAL ASSEMBLY STABS INTO LOWER TUBING 2.750 15,417 L Tubing Deseript String 0... String ID Top (MB) Set Depth (f... Set Depth (TVD) String Wt... String ... String Top Thrd PBR, 15,402 �_ - -. i } 1 PACKER, TUBING Lower 3 1/2 2.990 15 401.7 16,618.6 7,506.8 9.30 L EUE8rd SLEEVE-O, 15.464 , '1'1'11' m i t.:- 1. - �„*e. s r. �c3 3 5 '-, . 1.6 .., - . +.� , `k 3i .. - ° a , ^t.K. m''. , "''x711 - e- .... =:.,u' - .' NIPPLE, 15,538 - 1-- - Top Dept s �" ANCHOR, (ND) Top Intl 16,817 Nomi... NTERMEDIATE, Top (ftKB) (f B) (1 Item Description Comment ID (in) lei _ . - _. 15,401.7 7,366.0 83.75 PBR PBR - Seal OD 4" - Seal length 12' - Effective stroke 10' 3.000 17,566 PeAPup, 15 7,367.6 83.73 PACKER BAKER PREMIER PACKER (3.5 x 7 5/8 ") 2.875" ID 2.875 , _ 17,917 - 17,622 : 15,464.1 7,372.7 83.51 SLEEVE-0 BAKER CMU SLIDING SLEEVE w/ 2.812" "Br profile (OPEN 2.812 cANND LINER, ,r 11/26/2010) --' - -- _. 16,425- 17,978 f 15,538.0 7,381.0 83.56 NIPPLE 3 -1/2" HES "XN" nipple(2.75" Min. ID) 2.830 167616.8 7,506.6 83.02 ANCHOR COMPLETION 'I(' ANCHOR w/ P -110 body & latch 3.000 Other In Hole (Wireline retrievable plugs, valves, pumps, fish, etc.) °k.„ '4 Top Depth 1 ' (TVO) ', Top Inc! Top (ftKB) (ftKB) (°) Description I Comment Run Date ID (in) - 2,263.5 2,036.1 52 02 SLEEVE I ISO FRAC SLEEVE 11127/2010 2.750 Pe forations:& Slots Shot _... _. _. Top (TVD) Btm (TVD) Dens Top (ftKB) Elfin (MKB) (ftKB) (ftKB) Zone Date (eh... Type Comment 17,566.0 17,571.0 7,596.2 7,596.2 A -SAND, CD4 -25 10/22/2010 6.0 PerfPup All Pert Pups - 3 each 'h" holes rotated 60 degrees from first set of three h" holes a 17,917.0 17,922.0 7,598.7 7,598.7 A -SAND, CD4 -25 10/22/2010 6.0 PerfPup 18,267.0 18,272.0 7,598.6 7,598.8 A -SAND, CD4 -25 10/22/2010 6.0 PerfPup 18,619.0 18624.0 7,597.2 7,597.1 A -SAND, CD4-25 10/22)2010 6.0 PerfPup Ili 18,97(10 18,975.0 7,591.0 7,590.9 A -SAND, 004 25 10/22/2010 6.0 PerfPup 19,321.0 19326.0 7,584.8 7,585.1 ASAND, C04 25 10222010 6.0IPerfPup 19,668.0 19,673.0 7,583.8 7,583.7 ASAND, CD4 -25 10/22/2010 6.0 PerfPup V IA 20,017.0 20,022.0 7,578.4 7,578.5 ASAND, CD4 -25 10/22/2010 6.0 PerfPup PertPup, 7/711 . 20,365.0 20,370.0 7,570.5 7,570.6 A -SAND, CD4 -25 10/22/2010 6.0 PerfPup 18,267 - 18,272 PenPup _ _ 20,713.0 20,718.0 7,567.0 7,566.8 A -SAND, CD4 -25 10222010 6.0 PerfPup 18,619 - 18,624 - 1-111- 6 76.6 7 567.0 A -SAND, CD4 -25 10/222010 6.0 PerfPup Pe^ N ot 2 1,0 e s 1 : 0 General 8 Safety 18,970 - 18,975 En Date Annotation 11/12/2010 NOT MULTI - LATERAL WELL, CD4 -25, CD4 -25L1 PedPup, 71 26/ 2 010 27, NOT VIEW ,56 SCHEMATIC w /Alaska Schema 19,321 - 19,326 ..1` - _ PerlPUp, . - Mandrel Details 19,668. 19,673 $ Top Depth Top Port III (TVD) Inc! OD Valve Latch S1.40 TRO Run Stn Top NtKBJ 4 ,_.(ftKB) ( °) Make Model (in) Sery Type TYPO (in) (psi) Run Date Com... PerfPup,_ 1 5,065.8 3,413.9 60.58 CAMCO KBMG 1 GAS LIFT GLV - -- BK 0.188 1,840.0 11/20/2010 20,017 - 20,022 9 y:. ._ a .� .... - 2 10,347.9 5,619.9 67.10 CAMCO KBMG 1 GAS AS LIFT LIFT GLV BK 0.188 1,816.0 17202010 3 13,243.9 6,759.9 67.64 CAMCO KBMG 1 GAS LIFT OV BK 0.250 0.0 11/20/2010 PertPup - _- _ -'"-- - ----" 20,365- 20,370 PerlPup, 20,713 - 20,718 . Pert"up, 21,061 - 21,066 A-SAND LINER, 16,577- 21,160 TD (CD4 -25), 21,168 • • ConocoPhi[lips Time Log & Summary We/Wrew Web Reporting Report Well Name: CD4 - 25 Rig Name: DOYON 19 Job Type: DRILLING ORIGINAL Rig Accept: 9/8/2010 7:00:00 PM Rig Release: 11/12/2010 12:00:00 PM Time Logs Date From To Dur S. Depth E. Depth Phase Code Subcode T Comment 09/08/2010 24 hr Summary Begin Rig Move f/ CD4 -12 to CD4 -25 - Move Pit/Motor Complex and Pipe Shed - Troubleshoot and Repair Sub Moving System - Spot Sub Over CD4 -25 - Spot Pit/Motor and Pipe Shed - Accept Rig @ 1900 - Take on Spud Mud and Water - Build Drill -Out Mud - Rig Up Riser and Drain Lines 00:00 03:00 3.00 0 0 MIRU MOVE MOB P Disconnect Service Lines - Clean /Clear Rig Floor - Make Final Preparations - Separate Pits /Motor Complexes f/ the Sub 03:00 12:00 9.00 0 0 MIRU MOVE MOB T Troubleshoot and Repair Sub Moving System 12:00 19:00 7.00 0 0 MIRU MOVE MOB P Move Sub Base Back f/ CD4 -12 - Reposition Rig Mats - Spot Sub Over CD4 -25 - Spot Pits /Motors and Pipe Shed - Connect Electrical and Steam Lines - Connect High Line Power @ 1900 19:00 00:00 5.00 0 0 SURFA( DRILL RURD P Build Drill -Out Mud and Take On Spud Mud - Spot and Connect Ball Mill - Run MWD Cables and Install ABI on Motor 09/09/2010 Make up and rack back 8" flex DC "s and jars. Make up BHA #1 with 13 1/2" Hughes MXL -1X bit. Upload MWD assembly. Rig up Gyro data and Halliburton unit. Held Pre -Spud mtg with crew. Discuss Spud checklists, and perform tabletop "diverter -less" drill including evacuation procedure. Fill riser and hole. Fill & test lines to 3500 PSI. Good test - no leaks. Tag bottom at 118'. Continue directional drill from 118' - 1493 MD. ADT = 9.32 HRS. 00:00 03:45 3.75 0 0 SURFA( DRILL PULD P P/U and Stand Back 1 Std NMFDC's & Jars - P/U BHA #1 as Follows: 13 MXL -1X Bit, 8" Motor, 12 1 /4' NM -IBS, NM -XO, DM, HCIM, EM, Index Sub, Antenna Sub, NMFS, UBHO 03:45 05:45 2.00 0 0 SURFA( DRILL RURD P Orient UBHO and Motor to DM Scribe - R/U Sperry E -Line Unit and Gyrodata - Plug In and Read MWD Data. M/U NMFDC's 05:45 07:15 1.50 0 0 SURFA( DRILL PRTS P Hold Pre -Spud Meeting. Discuss safety & hazard recognition issues. Discuss Pre -Spud Checklist and ensure tasks checked off. Held tabletop "Diverter -less drill ". Discuss evacuation procedures. Fill Riser and hole - 37 BBLS & Check for Leaks - PrPscure Tpst 1 ines t/ 3500 PSI Page 1 of 50 • Time Logs Date From To Dur S. Depth E. Depth Phase Code Subcode T Comment 07:15 12:00 4.75 0 461 SURFA( DRILL DDRL P Tao bottom in 16" casino at 118' MD. Drill from 118- 461' MD. TVD = 461' Utilize Gyro Data obtainnig confirmation surveys. Pump rates Y P from 450 - 500 GPM's with 550 - 800 PSI. 40 RPM's with 3 5K TQ. AST = .72 HRS ART = 2.15 HRS ADT = 2.87 HRS 12:00 18:00 6.00 461 922 SURFA( DRILL DDRL P Continue Directional drill 13 1/2" hole from 461' - 922' MD. TVD = 917'. Utilize Gyro Data obtainnig confirmation surveys. Pump rates from 450 - 500 GPM's with 550 - 800 PSI. 40 RPM's with 3 5K TQ. AST = 1.95 HRS ART = 1.53 HRS Total ADT = 3.53 HRS 18:00 00:00 6.00 922 1,493 SURFA( DRILL DDRL P Drill 13 1 /2' Hole t/ 1493' MD - Taking E -Line Gyro's Every Stand Until 1397' MD, Last Gyro Used @ 915' MD AST 1.74 / ART 1.18 P/U 134, 8/0 130, Rot 134 500 GPM @ 1160 Psi RPM 60, Torque On /Off 8/4 WOB 25 09/10/2010 ✓ Drill 13'/2' Hole t/ 2,968' MD (2,398' TVD) TD - CBU X2 - BROOH t/ 2,638' MD 00:00 06:00 6.00 1,493 1,967 SURFA( DRILL DDRL P Drill 13'/2' Hole t/ 1967' MD TVD =_ ADT 3.16, ART 2.03, AST 1.13 P/U 142, S/0 129, Rot 135 Torque On /Off 8.5/5.5 © 70 RPM 600 GPM @ 1630 Psi WOB 25 06:00 12:00 6.00 1,967 2,400 SURFA( DRILL DDRL P Drill 13'/2' Hole t/ 2400' MD TVD = 2115'. ADT 4.73, ART 2.80, AST 1.93 P/U 147, S/0 128, Rot 136 Torque On /Off 8.5/6 @ 70 RPM 650 GPM @ 1840 Psi WOB 30 12:00 18:00 6.00 2,400 2,675 SURFA( DRILL DDRL P Drill 13 %" Hole t/ 2675' MD TVD = 2255'. ADT 4.99, AST 0.72, ART 4.27 P/U 148, S/0 125, Rot 135 Torque On /Off 8/6 650 GPM @ 2020 Psi WOB 30 Page 2 of 50 Time Logs Date From To Dur S. Depth E. Depth Phase Code Subcode T Comment iAk 18:00 22:15 4.25 2,675 2,968 SURFA( DRILL DDRL P Drill 13 %" Hole t/ 2.968' MD 2.398' TVD (TD) ADT 2.47, ART 2.18 AST 0.29 P/U 149, S/O 129, Rot 139 Torque On /Off 8/6 @ 70 RPM 700 GPM @ 2420 Psi WOB 30 22:15 23:15 1.00 2,968 2,823 SURFA( DRILL CIRC P OWFF (Static) - CBU X2 @ 700 GPM w/ 2150 Psi - Stand 1 Stand Back Every % hr t/ 2,823' MD 23:15 00:00 0.75 2,823 2,638 SURFA( DRILL WPRT P OWFF (Static) - BROOH t/ 2,638' MD 80 RPM 700 GPM @ 2200 Psi 09/11/2010 Continue to BROOH t/ 920' MD - OWFF (Static) - RIH t/ 2,917' MD, then Wash Down t/ 2,968' MD - Circ and Condition Mud - OWFF (Static) - POOH on TT t/ 926' MD (Top of HWDP) - OWFF (Static) - Stand Back HWDP, L/D NMFDC's and Jars, Download MWD Data and UD the Remainder of BHA #1 - R/U and Run 10 %" Casing t/ 1,638' MD - Circ and Condition Mud - Continue to RIH w/ Casing & Land @ 2,968' MD - Circ and Condition Mud Prior to Cementing 00:00 05:00 5.00 2,638 926 SURFA( DRILL WPRT P Continue to BROOH t/ 926' MD - Slowed Pumps f/ 650 GPM @ 2050 Psi to 500 GPM @ 1240 Psi in Permafrost; Pulled Final 3 Stands @ 4 FPM to Allow for 4 X Bottoms Up 05:00 05:15 0.25 926 926 SURFA( DRILL OWFF P Blow Down Top Drive & OWFF (Static) 05:15 07:00 1.75 926 2,968 SURFA( DRILL WPRT P RIH t/ 2,917' MD - Wash Down t/ 2,968' MD 07:00 07:45 0.75 2,968 2,968 SURFA( DRILL CIRC P Circ and Condition Mud @ 700 GPM w/ 2280 Psi and 80 RPM 07:45 08:00 0.25 2,968 2,968 SURFA( DRILL OWFF P Blow Down the Top Drive and OWFF (Static) 08:00 10:00 2.00 2,968 926 SURFA( DRILL TRIP P POOH t/ 926' MD on TT 10:00 11:00 1.00 926 188 SURFA( DRILL TRIP P OWFF (Static) - Stand Back HWDP t/ 188' MD 11:00 11:30 0.50 188 92 SURFA( DRILL PULD P UD 2- NMFDC's and Jars t/ 92' MD 11:30 12:00 0.50 92 92 SURFA( DRILL PULD P Download MWD Data 12:00 13:15 1.25 92 0 SURFA( DRILL PULD P UD Remainder of BHA #1 13:15 14:00 0.75 0 0 SURFA( DRILL PULD P Clean / Clear Rig Floor 14:00 15:15 1.25 0 0 SURFA( CASING RURD P R/U to Run 10 3 /4' Casing 15:15 19:45 4.50 0 1,638 SURFA( CASING RNCS P Run 10 3/4' Casing per Detail t/ 1,638' MD (40 Jts) 19:45 20:30 0.75 1,638 1,638 SURFA( CASING CIRC P Circ & Condition Mud, Staged Pumps Up f/ 31/2 BPM @ 230 Psi to 7 BPM @ 250 Psi 20:30 22:30 2.00 1,638 2,958 SURFA( CASING RNCS P Continue to RIH w/ 10 3 /" Casing, M/U Hanger and Landing Joint and Land Casing w/ shoe @ 2,958' MD 22:30 23:00 0.50 2,958 2,958 SURFA( CASING RURD P R/D Casing Running Equipment & R/U Cement Head & Lines Page 3 of 50 . • Time Logs Date From To Dur S. Depth E. Depth Phase Code Subcode T Comment 23:00 00:00 1.00 2,958 2,958 SURFA( CASING CIRC P Circ & Condition Mud Prior to Cementing - Stage Pumps Up f/ 3 BPM @ 280 Psi to 5 BPM @ 220 Psi 09/12/2010 Continue to Circ and Condition Mud Prior to Cementing - Cement 10 %" Casing w/ 407 bbls, 11 PPG, Lead and 56.5 bbls, 15.8 PPG, Tail Cement - Checked Floats (Good) - CIP @ 0430 - R/D Casing /Cementing Equipment - N/D Riser and Adapter - N/U Well Head and BOPE - Slip /Cut Drill Line - P/U 95 Stands of 5" DP f/ the Shed 00:00 01:15 1.25 2,958 2,958 SURFA( CASING CIRC P Continue to Circ and Condition Mud Staging Pumps Up t/ 7 BPM w/ 290 Psi 01:15 01:30 0.25 2,958 2,958 SURFA( CEMEN" SFTY P PJSM on Cementing 10 3/4" Casing 01:30 04:30 3.00 2,958 2,958 SURFA( CEMEN" CMNT P Cement 10 %" Casing as Follows: _ e r ( Pump 43 Bbls, 9.8 PPG Mud w/ 3 PPB Nut Plug; 26 Bbls Biozan & Nut S y", Plug Pill - Dowell Pumped 2 Bbls LS Water & Pressure Tested Lines t/ (((/// 2500 Psi - Dropped Bottom Plug - Pumped 48 Bbls 10.5 PPG Mud Push II, 407 Bbls 11 PPG "PAK" Lead Cement and 56.5 Bbls of 15.8 PPG Surface Tail Cement - Dropped Top Plug & Pumped 20 Bbls Water - Displaced Cement w/ 9.8 PPG Mud @ 7 BPM for 210 Bbls, Slowed Pumps t/ 4 BPM 500 Psi for Final 47 Bbls - Plug Bumped @ 157 BBIs - Held 1050 Psi f/ 5 - Checked Floats (Good) - CIP @ 0430 - Est. 115 Bbls of Cement Back to Surface - Pipe Reciprocated for the First 150 Bbls of Displacement (15' Stokes) 04:30 07:00 2.50 2,958 0 SURFA( CEMEN" RURD P R/D Cement Head and Casing Slips - Clean/Clear Rig Floor - Allow Cement to Settle in Annulus Prior to Draining Stack 07:00 08:45 1.75 0 0 SURFA( WHDBO NUND P Pull Mouse Hole and N/D Surface Riser - Release Slips and N/D Riser Adapter 08:45 13:00 4.25 0 0 SURFA( WHDBO NUND P N/U Well Head and Test Seals t/ 1000 Psi - N/U BOPE - Install Mouse — Hole - N/U Choke and Flare Lines 13:00 14:30 1.50 0 0 SURFA( RIGMNT SLPC P PJSM - Slip & Cut Drill Line - Service Draw Works - P/U Geo -Span 14:30 00:00 9.50 0 0 SURFA( DRILL PULD P P/U 5" DP via the Mouse Hole and Stand Back (95 Stands) 09/13/2010 R/U and Test BOPE w/ 5" Test Joint as Follows; Test Annular t/ 250/2500 Psi, Test Upper /Lower Rams, Choke Manifold Valves, 4" DEMCO, and Blinds t/ 250/3500 (AOGCC Inspector C/ Scheeve Waived Witnessing the Test) - P/U BHA #2 and RIH t/ 2,701' MD - R/U and Test 10 3 /" Surface Casing 11 3500 Psi f/ 30 Minutes (Blind Rams Incidentally Closed on 5" DP) - POOH and UD BHA #2 - R/U and Test Blind Rams 1/ 250/3500 Psi - M/U BHA #3 and RIH 1/ 1,851' MD 00:00 00:45 0.75 0 0 SURFA( WHDBO RURD P R/U to Test BOPE Page 4 of 50 Time Logs Date From To Dur S. Depth E. Depth Phase Code Subcode T Comment 00:45 04:45 4.00 0 0 SURFA( WHDBO BOPE P Test BOPE w/ 5" Test Joint as Follows: Test Annular Preventer to 250/2500 Psi - Test Upper & Lower Rams, Choke Manifold Valves 1 -16, 4" DEMCO, Auto /Man IBOP, Dart, Man /HCR Choke /Kill Valves & TIW to 250/3500 Psi - Perform Accumulator Test: 30 Sec for 200 Psi Increase / 2:55 for Full Charge - Function Auxiliary Panel (Good) - Remove Test Joint and Test Blinds t/ 250/3500 Psi - Tested PVT & Flow Paddle - Tested Totco Hydraulic /Manual Choke t/ 1500 Psi ** All Pressure Tests Held for 5 Minutes ** 04:45 05:15 0.50 0 0 SURFA( WHDBO RURD P R/D BOPE Testing Equipment 05:15 05:45 0.50 0 0 SURFA( DRILL RURD P Set Bowl Protector - R/U to M/U BHA #2 05:45 07:00 1.25 0 123 SURFA( DRILL PULD P P/U BHA #2 as Follows: Bit, Geo- Pilot, Flex Collar, EWR, ILS, DGR, CLR, PWD, HCIM, SLD, CTN, Pulser, Bat Collar & Float Sub t/ 123' MD 07:00 07:45 0.75 123 123 SURFA( DRILL PULD P Upload MWD 07:45 08:15 0.50 123 123 SURFA( DRILL PULD P PJSM - Load Nuclear Sources r/ 08:15 09:00 0.75 123 328 SURFA( DRILL PULD P Continue to M/U BHA #2 as Follows: 2 -Flex Collars, Ball Catcher, Well Commander, Flex Collar & 1 Stand of HWDP t/ 328' MD 09:00 09:45 0.75 328 328 SURFA( DRILL DHEQ P Pressure Test Geo -Span V 3500 Psi - Shallow Test MWD @ 740 GPM w/ 1900 Psi - Function Well Commander (2 Balls In Catcher)1930 Psi Open /2100 Psi Closed 09:45 10:30 0.75 328 797 SURFA( DRILL PULD P Continue to P/U BHA #2 as Follows: Jars, 8- Stands HWDP, 3 -Point Reamer, and 2 Stds HWDP U 607' MD 10:30 12:00 1.50 797 2,701 SURFA( DRILL PULD P Continue to P/U BHA #2 as Follows: 32 Joints of 5" DP f/ the Shed, 3 -Point Reamer, 1 Jt 5" DP f/ the Shed, then 9 Stands of 5" DP f/ the Derrick t/ 2,701' MD 12:00 13:00 1.00 2,701 2,701 SURFA( DRILL CIRC P Circ and Condition Mud 13:00 14:45 1.75 2,701 2,701 SURFA( DRILL PRTS P R/U and Test Surface Casing t/ 3500 Psi f/ 30 Minutes (Good) - Blind Rams Incidentally Closed on 5" DP - V Conferred w/ Town - UD Joint, POOH and Re -Test Blind Rams (No Visible Damage to 5' DP Joint) 14:45 16:30 1.75 2,701 328 SURFA( DRILL TRIP T POOH f/ 2,701' - 328' MD 16:30 18:30 2.00 328 0 SURFA( DRILL PULD T Handle BHA Per DD - PJSM - Unload Nuclear Sources - Download MWD Page 5 of 50 Time Logs Date From To Dur S. Depth E. Depth Phase Code Subcode T Comment 18:30 19:00 0.50 0 0 SURFA( WHDBO PULD T Drain Stack & Pull Wear Ring 19:00 19:30 0.50 0 0 SURFA( WHDBO RURD T Set Test Plug w/ Test Joint - R/U to Test Blind Rams 19:30 20:15 0.75 0 0 SURFA( WHDBO BOPE T Test Blind Rams t/ 250/3500 Psi f/ 5 Minutes 20:15 20:45 0.50 0 0 SURFA( WHDBO RURD T Pull Test Plug - Blow Down Lines - Set Bowl Protector 20:45 21:45 1.00 0 128 SURFA( DRILL PULD T M/U BHA #3 as Follows: Geo- Pilot, Flex Collar, EWR, ILS, DGR, PWD, HCIM, SLD, CTN, Pulser and Bat Collar t/ 128' MD 21:45 22:30 0.75 128 128 SURFA( DRILL PULD T Upload MWD Data - PJSM Load Nuclear Sources 22:30 00:00 1.50 128 2,701 SURFA( DRILL TRIP T RIH w/ BHA #3 f/ the Derrick as Follows: Float Collar, 2 NMFDC's, Ball Catcher, Well Commander, NMFDC, 1 Std HWDP, Jars, 7 Jts HWDP, 3 -Point Reamer, 7 Jts HWDP, 32 Jts 5" DP, 3 -Point Reamer and 1 Jt of 5" DP t/ 1,851' MD then RIH w/ 9 Stands of DP t/ 2,701' MD 09/14/2010 Wash f/ 2,701' to TOC @ 2,861' MD - Drill Shoe Track and 20' of New Hole t/ 2,988' MD (2,407' TVD) - R/U and Conduct LOT t/ 17.8 PPGE (1000 Psi) - Displace Well Bore f/ 9.8 PPG Spud Mud to 9.6 PPG LSD Mud - OWFF (Static) - Drill 9 7/8" Hole t/ 4,876' MD 00:00 00:30 0.50 2,701 2,862 SURFA( DRILL WASH P Wash Down and Tag Cement @ 2,862' MD 650 GPM @ 2300 Psi 60 RPM 00:30 03:00 2.50 2,862 2,968 SURFA( CEMEN" DRLG P Drill Shoe Track t/ 2,968' MD Torque 9 -10 K @ 60 RPM 650 GPM @ 2300 Psi WOB 8 K 03:00 03:30 0.50 2,968 2,988 SURFA( DRILL DDRL P Drill 9 7/8" Hole t/ 2,988' MD (2,407' TVD) WOB 8 Torque On /Off 9/8 @ 60 RPM 650 GPM @ 2350 Psi P/U 152, Rot 130, S/O 115 03:30 04:00 0.50 2,988 2,988 SURFA( DRILL CIRC P Circ & Condition Mud Prior to FIT 04:00 05:00 1.00 2,988 2,988 SURFA( DRILL LOT P R/U and Conduct LOT t/ 17.8 EMW L.-6r (1000 Psi) - R/D LOT Equipment 05:00 05:45 0.75 2,988 2,988 INTRMI DRILL CIRC P Displace Wellbore Fluids t/ 9.6 PPG LSD 05:45 06:00 0.25 2,988 2,988 INTRMI DRILL OWFF P OWFF (Static) 06:00 12:00 6.00 2,988 3,461 INTRM1 DRILL DDRL P Drill t/ 3,461' MD ADT - 4.00 P/U 142, S/O 129, Rot 136 740 GPM © 2520 Psi / ECD 10.44 WOB 10 / RPM 160 Torque On /Off 8/6 Page 6 of 50 • Time Logs Date From To Dur S. Depth E. Depth Phase Code Subcode T Comment 12:00 18:00 6.00 3,461 4,152 INTRM1 DRILL DDRL P Drill t/ 4,152' MD ADT 3.96 P/U 150, S/O 137, Rot 144 740 GPM @ 2800 Psi / ECD 10.88 WOB 15 / RPM 170 Torque On /Off 9/6 18:00 00:00 6.00 4,152 4,876 INTRM1 DRILL DDRL P Drill t/ 4,876' MD ADT 3.32 P/U 155, S/O 140, ROt 148 740 GPM @ 2370 Psi / ECD 10.67 WOB 12 / RPM 160 Torque On /Off 9/6.5 09/15/2010 Drill t/ 4,975' MD - Hole Packed Off /Lost Returns; POOH t/ 4,792' MD (Regained Circulation) Work Pipe f/ 4,697' - 4,972' MD While Staging Pumps and RPM Up to Drillin. Rate -Drill t/ 7,215' MD 00:00 00:45 0.75 4,876 4,975 INTRM1 DRILL DDRL P Drill t/ 4,975' MD - Began 275 Bbl Whole Mud Dilution @ 4,948' MD ADT .55 P/U 158, 8/0 142, Rot 150 740 GPM @ 2720 Psi / ECD 10.7 WOB 15 / RPM 160 Torque On /Off 9/7 Page 7 of 50 • Time Logs Date From To Dur S. Depth E. Depth Phase Code Subcode T Comment 00:45 02:45 2.00 4,975 4,975 INTRM1 DRILL CIRC T Hole Parked Off While Drilling_,( 4 975' MD (Ghost Reamers @ 4,396' / 3,159' MD); Max Observable ECD 14.4 PPG, Lost Returns - Slowed Pumps t/ 1 BPM and POOH t/ 4,792' MD to Regain Circulation (Top Ghost Reamer in Casing) - Work Pipe f/ 4,697'- 4,792' MD / Stage Pumps & RPM Up as Follows: 35 RPM 1 BPM w/ 500 Psi; 0 -14% Flow 2 BPM w/ 600 Psi; 38% Flow 2.5 BPM w/ 650 -500 Psi; 41 % Flow 60 RPM 3 BPM w/ 530 Psi; 39% Flow 3.5 BPM w/ 530 Psi; 42% Flow 4 BPM w/ 460 Psi; 45 -48% Flow 5 BPM w/ 540 -420 Psi; 52% Flow 6 BPM w/ 520 Psi; 54% Flow 7 BPM w/ 600 Psi; 55% Flow 7.5 BPM w/ 700 Psi; 55% Flow 9 BPM w/ 860 Psi; 58% Flow 10 BPM w/ 990 Psi; 58% Flow 11 BPM w/ 1130 Psi; 61% Flow 12 BPM w/ 1300 Psi; 61% Flow 12.5 BPM w/ 1420 Psi; 63% Flow 13 BPM w/ 1510 Psi; 62% Flow 90 RPM 14.5 BPM w/ 1790 Psi; 65% Flow 16.5 BPM w/ 2340 Psi; 68% Flow 17.5 BPM w/ 2610 Psi; 66% Flow ECD's Dropped f/ 11.1 @ 12 BPM w/ 1300 Psi to 10.17 @ 17.6 BPM w/ 2610 Psi - The Hole Unloaded a Substantial Amount of "Hockey Puck" to "Cow Pie" Sized Cuttings Wash Back to Bottom @ 740 GPM w/ 2700 Psi and 160 RPM 02:45 06:00 3.25 4,975 5,306 INTRM1 DRILL DDRL P Drill t/ 5,306' MD ADT 2.81 P/U 159, S/O 144, Rot 155 740 GPM @ 2800 Psi / ECD 10.27 WOB 12 / RPM 160 Torque On /Off 9/6.5 Page 8 of 50 • • Time Logs Date From To Dur S. Depth E. Depth Phase _Code Subcode T Comment 06:00 12:00 6.00 5,306 5,932 INTRM1 DRILL DDRL P Drill t/ 5,932' MD - Began 275 Bbl Whole Mud Dilutuion @ 5,740' MD ADT 2.7 P/U 173, S/O 146, Rot 157 750 GPM @ 2930 Psi / ECD 10.67 WOB 16 / RPM 170 Torque On /Off 10/7 12:00 18:00 6.00 5,932 6,570 INTRMI DRILL DDRL P Drill t/ 6,570' MD - Began 275 Bbl Whole Mud Dilution @ 6,300' MD ADT 3.3 P/U 176, S/O 150, Rot 164 750 GPM @ 3040 Psi / ECD 10.43 WOB 30 / RPM 170 Torque On /Off 11/7.5 18:00 00:00 6.00 6,570 7,215 INTRM1 DRILL DDRL P Drill t/ 7,215' MD - Began 275 Bbl Whole Mud Dilution @ 6,978' MD ADT 3.37 P/U 185, S/O 150, Rot 167 750 GPM @ 2850 Psi / ECD 10.62 WOB 15 / RPM 170 Torque On /Off 12/8 09/16/2010 Drill t/ 7,929' MD - Troubleshoot Stand Pipe Pressure Loss - Circ & Condition for Trip - POOH /BROOH t/ 5,996' MD - Found Top Single of Stand #44 Washed Out - Change Joint - Pump Down String to Verify Integrit - RIH t/ 7,833' MD - Wash Down t/ 7,929' MD - Drill t/ 9,164' MD 00:00 05:30 5.50 7,215 7,929 INTRMI DRILL DDRL P Drill t/ 7,929' MD - Lost 410 Psi Over Stand ADT 3.27 P/U 194, S/O 155, Rot 173 750 GPM @ 2400 - 1990 Psi / ECD 10.57 Torque On /Off 13.5/8 WOB 16 / RPM 170 05:30 07:30 2.00 7,929 7,929 INTRM1 DRILL PRTS T Troubleshoot Loss of Stand Pipe Pressure - Pump 100 Strokes w/ Each Pump; Pressures Equal - Close IBOP and Pressure Test Each Pump t/ 2000 Psi - Listen to Valves /Seats w/ Stethoscope - Inspect/Change Rt Valve and Seat on #1 MP - Repeat Pressure Tests Above w/ Same Result - Increase to Drilling Rate and Pressure Still Low - Sus•ect Wash Out in Drill String 07:30 08:15 0.75 7,929 7,929 INTRM1 DRILL CIRC T Circ and Condition Mud Prior to Tripping - 750 GPM @ 1770 Psi w/ 60 RPM 08:15 08:30 0.25 7,929 7,929 INTRM1 DRILL OWFF T OWFF (Static) 08:30 09:30 1.00 7,929 7,643 INTRM1 DRILL TRIP T POOH on TT t/ 7,643' MD (Swabbing) - 3 Stands 09:30 12:00 2.50 7,643 6,217 INTRM1 DRILL REAM T BROOH t/ 6,217' MD (15 Stands) - 700 GPM @ 1370 Psi w/ 120 RPM Page 9 of 50 Time Logs Date From To Dur S. Depth E. Depth Phase Code Subcode T Comment 12:00 12:30 0.50 6,217 5,996 INTRMI DRILL TRIP T OWFF (Static) - POOH on TT t/ 5,996' MD (3 Stands) - Found Top Single of Stand #44 Washed Out 12:30 12:45 0.25 5,996 5,966 INTRM1 DRILL PULD T UD Single - Pump @ 750 GPM w/ 2780 Psi to Confirm String Integrity 12:45 14 :00 1.25 5,966 7,833 INTRM1 DRILL TRIP T Blow Down Top Drive - OWFF (Static) - RIH t/ 7833' MD (20 Stands) 14:00 14:15 0.25 7,833 7,929 INTRMI DRILL WASH T Wash t/ 7,929' MD - 250 GPM w/ 2900 Psi and 130 RPM 14:15 18:00 3.75 7,929 8,500 INTRM1 DRILL DDRL P Drill t/ 8,500' MD ADT 2.54 P/U 197, S/O 155, Rot 175 750 GPM @ 2920 Psi / ECD 10.6 Torque On /Off 14/10 WOB 15 / RPM 170 18:00 00:00 6.00 8,500 9,164 INTRM1 DRILL DDRL P Drill t/ 9,164' MD ADT 2.92 P/U 208, S/O 158, Rot 183 750 GPM @ 2900 Psi / ECD 10.63 WOB 15 / RPM 170 Torque On /Off 16/11.5 09/17/2010 Drilled f/ 9164' - 12,000' MD 00:00 06:00 6.00 9,164 9,925 INTRM1 DRILL DDRL P Drill t/ 9,925' MD ADT 3.59 P/U 217, S/O 155, Rot 184 Torque On /Off 17/13 WOB 15 / RPM 170 750 GPM @ 2900 Psi / ECD 10.6 06:00 12:00 6.00 9,925 10,685 INTRM1 DRILL DDRL P Drill t/ 10,685' MD ADT 2.72 P/U 220, S/O 165, Rot 189 Torque On /Off 16/12 WOB 22 / RPM 170 750 GPM @ 3100 Psi / ECD 10.65 12:00 18:00 6.00 10,685 11,445 INTRM1 DRILL DDRL P Drill t/ 11,445' MD ADT 4.35 P/U 250, S/O 155, Rot 194 Torque On /Off 19.5/16 WOB 20 / RPM 170 750 GPM @ 3100 Psi / ECD 10.63 18:00 00:00 6.00 11,445 12,000 INTRM1 DRILL DDRL P Drill t/ 12,000 ADT 3.24 P/U 250, S/O 160, Rot 195 Torque On /Off 18/14 WOB 20 / RPM 160 750 GPM @ 3040 Psi / ECD 10.4 09/18/2010 Drilled f/ 12,000' - 14,394' MD Page 10 of 50 • • Time Logs Date From To Dur S. Depth E. Depth Phase Code Subcode T Comment 00:00 06:00 6.00 12,000 12,680 INTRM1 DRILL DDRL P Drill t/ 12,680' MD ADT 3.99 P/U 257, S/O 165, Rot 205 750 GPM @ 2950 Psi / ECD 10.54 WOB 20 / RPM 160 Torque On /Off 20/15 06:00 12:00 6.00 12,680 13,302 INTRM1 DRILL DDRL P Drill t/ 13,302' MD ADT 3.26 P/U 286, S/O 160, Rot 204 WOB 20 / RPM 150 Torque On /Off 22/15.5 740 GPM @ 3040 Psi / ECD 10.6 12:00 18:00 6.00 13,302 13,975 INTRM1 DRILL DDRL P Drill t/ 13,975 - Increased MW t/ 10.5 PPG and Performed Glydril Dilution @ 13,550 MD Prior to Drilling the HRZ ADT 4.22 P/U 275, S/O 165, Rot 210 WOB 20 / RPM 150 Torque On /Off 20/15.5 700 GPM @ 3530 Psi / ECD 11.27 18:00 00:00 6.00 13,975 14,394 INTRM1 DRILL DDRL P Drill t/ 14,394' MD - Began to Increase MW t/ 11.0 PPG Prior to Drilling the Miluveach ADT 3.15 P/U 285, S/O 160, Rot 210 WOB 20 / RPM 160 Torque On /Off 20/14.5 675 GPM @ 3590 Psi / ECD 11.37 09/19/2010 Continue Drilling f/ 14,394' - 16,016' MD - Lost 1000 Psi on Stand Pipe - Troubleshoot Pressure Loss by Testing, Surface Equipment (Good) - BROOH t/ 15,755' MD 00:00 06:00 6.00 14,394 14,875 INTRM1 DRILL DDRL P Drill t/ 14,875' MD - 250 Bbl Whole Mud Dilution @ 14,853' MD ADT 4.09 P/U 285, S/O 160, Rot 210 660 GPM @ 3775 Psi / ECD 11.75 WOB 15 / RPM 150 Torque On /Off 20/15 06:00 12:00 6.00 14,875 15,319 INTRM1 DRILL DDRL P Drill t/ 15,319' MD ADT 3.68 P/U 302, S/O 151, Rot 213 660 GPM @ 3730 Psi / ECD 11.74 Torque On /Off 20.5/15.5 @ 150 RPM WOB 18 12:00 18:00 6.00 15,319 15,835 INTRM1 DRILL DDRL P Drill t/ 15,385' MD ADT 4.23 P/U 310, S/O 145, Rot 213 660 GPM @ 3740 Psi / ECD 11.6 Torque On /Off 20.5/16 @ 150 RPM WOB 20 Page 11 of 50 • Time Logs Date From To Dur S. Depth E. Depth Phase Code _Subcode T Comment 18:00 22:30 4.50 15,835 16,016 INTRM1 DRILL DDRL P Drill t/ 16,016' MD - 250 Bbl Whole Mud Dilutions @ 15,700' and 16,015' MD ADT 3.85 P/U 310, S/O 145, Rot 213 660 GPM @ 3750 - 2867 Psi / ECD 11.59 Torque On /Off 20/16 @ 150 RPM WOB 20 22:30 23:00 0.50 16,016 16,016 INTRM1 DRILL OTHR T Troubleshoot Loss of Pump Pressure; Check Mud Properties, Consult MWD (Detection Problems Encountered), Inspect Mud Pumps, Pump Both Individually at Same Rate; Pressures Equal, Close 4" on Each Pump and Pressure Test Each Against IBOP t/ 2700 Psi (Good) - Indications of Wash Out in Drill String 23:00 00:00 1.00 16,016 15,755 INTRMI DRILL REAM T BROOH f/ 16,016' - 15,755' MD; Pumping 420 GPM @ 1300 Psi w/ 100 RPM 09/20/2010 BROOH f/ 15,755' to 11,064' MD - POOH on TT t/ 7,738' MD - POOH w/ Pumps t/ 5,172' MD 00:00 09:30 9.50 15,755 12,673 INTRMI DRILL REAM T BROOH f/ 15,755' - 12,673' MD (32 Stands) 100 RPM @ 580 GPM w/ 2230 Psi Tight Spots @ 15,624, 15,550, 14,870, 14,116, 13,294, 13,688, 13,530, 13,406, 13,397, 13,380, 13,162, 13,091, 12,958, 12,701, & 12,680 09:30 14:30 5.00 12,673 11,064 INTRM1 DRILL REAM T BROOH f/ 12,673' - 11,064' MD (17 Stands) 150 RPM w/ 750 GPM @ 2450 Psi Tight Spots @ 12,565, 12,451, 12,367, 12,330, 12,260 and 12,173 14:30 17:15 2.75 11,064 7,738 INTRMI DRILL TRIP T POOH on TT t/ 7,738' MD (34 Stands) 17:15 00:00 6.75 7,738 5,172 INTRMI DRILL TRIP T BROOH U 7,453' MD (5 Stands); 700 GPM @ 1560 Psi w/ 100 RPM - POOH t/ 7,074' MD on TT (Improper Hole Fill) - Pull Out of Hole w/ Pumps t/ 5,172' MD (19 Stands); 8 BPM w/ 330 Psi Tight Spots @ 6,390', 6,295' & 5,600' (Reamed Through) - Tight Spots Pulled Up to 50K Over had Increased Pressure and Had to Work Through Page 12 of 50 0 0 Time Logs Date From To Dur S. Depth E. Depth Phase Code Subcode T Comment 09/21/2010 24 hr Summary Cont. BROOH looking for wash out - Worked pipe through hole @ 4897' - BROOH to 2891' - POOH f/ 2891' 2796' (swabbing) POOH w/ pump to 1851' - POOH f/ 1851' (found wash out in btm ghost reamer) LD BHA - RU & test BOPE - MU BHA # 4 - RIH to 789' 00:00 00:15 0.25 5,172 4,896 INTRM1 DRILL TRIP T POOH w/ Pumps f/ 5,172' - 4,896' MD (3 Stands) 8 BPM @340 Psi 00:15 01:30 1.25 4,896 4,896 INTRMI DRILL OTHR T Pulled 25K Over Up Weight @ 4,896' MD - Attempt to Work Pipe Down (Unable); Set Down to Block Weight (75K) - Able to Rotate, and Circulate but Unable to Go Up /Down - Work , Pipe w/ RPM 80 -100 and Pumps 8 -14 BPM w/ 350 -850 Psi - Jarred Down and Up - Pulled Up to 100K Over and Set Jars Off - Pipe Free - Hole Did Not Pack Off or Torque Up While Working Pipe 01:30 06:45 5.25 4,896 2,891 INTRM1 DRILL REAM T BROOH t/ 2,891' 06:45 07:15 0.50 2,891 2,796 INTRMI DRILL TRIP T Monitor well (static) Pull out of the hole on elevators from 2891' to 2796' - -well swabbing 07:15 10:45 3.50 2,796 795 INTRM1 DRILL TRIP T Monitor well (static) Pump out of the hole from 2796' to 795' w/ 340 gpm @ 230 psi 10:45 11:30 0.75 795 239 INTRMI DRILL TRIP T Monitor well (static). Pull out of the hole on elevators from 795' to 239' Found wash out in btm ghost reamer - washed out in blade - 24" down f/ box - 2" long x 1" wide 11:30 12:00 0.50 239 180 INTRM1 DRILL PULD T Lay down Commander sub and stand back NMDC 12:00 14:00 2.00 180 0 INTRM1 DRILL PULD T Safety meeting, unload nuclear sources and lay down BHA 14:00 15:00 1.00 0 0 INTRMI WHDBO RURD T Pull wear ring. Set test plug. Fill stacka nd choke with water and rig up to BOPE test equipment 15:00 18:30 3.50 0 0 INTRM1 WHDBO BOPE T Test BOPE. Test annular to Q o (� 250/2500 psi. Test all other �J I components to 250/3500 psi. Test accumulator. 18:30 19:00 0.50 0 0 INTRM1 WHDBO RURD T Rig down test equipment. Pull test plug and set wear ring. 19:00 00:00 5.00 0 798 INTRM1 DRILL PULD T MU BHA # 4 - RR bit # 2 - Geo Pilot - MWD - BAT Sonic - Up load MWD - PJSM on laoding RA sources - Load sources - Shall pulse test MWD & GP 650 gpm @ 1600 psi - RIH f/ 126' to 798' 09/22/2010 RIH to 2885' - Cut & slip drill line - RIH to 7542' - Circ & cond. mud - Cont. RIH to 13,330' - Circ & cond. mud - RIH to 14,726' - (worked thru tight hole f/ 14,638' to 14,726') - Wash & ream thru tight hole to 15,065' - hole packin off - Work string back out of hole f/ 15,065' to 14,726' 00:00 01:45 1.75 798 2,885 INTRM1 DRILL TRIP T Run in the hole from 798' to 2885' Page 13 of 50 • • Time Logs Date From To Dur S. Depth E. Depth Phase Code Subcode T Comment 01:45 03:00 1.25 2,885 2,885 INTRM1 RIGMNT SLPC T Pre -job safety meeting. Cut and slip 82' of drilling line 03:00 05:45 2.75 2,885 7,542 INTRM1 DRILL TRIP T Run in the hole form 2885' to 7542'. Fill pipe every 20 stands 05:45 07:15 1.50 7,542 7,452 INTRM1 DRILL CIRC T Circulate bottoms up at 550 gpm @ 2050 psi. Increase rate to 700 bpm / 3112 psi / 140 rpm @ 11K torque for second BU. 07:15 10:30 3.25 7,452 13,330 INTRM1 DRILL TRIP T Trip in the hole from 7637' to 13330'. Fill pipe every 20 stands. Tite spots at 11128' and 11544' 10:30 13:00 2.50 13,330 13,330 INTRM1 DRILL CIRC T Circulate bottoms up at 575 gpm @ 2830 psi. Increased rate to 700 gpm / 3619 psi / 145 rpm @ 18.4K torque for second BU. 13:00 14:15 1.25 13,330 14,726 INTRM1 DRILL TRIP T Continue running in the hole from 13330' to14726'. Work through tight spot from 14638' to 14726' 14:15 15:30 1.25 14,726 115,065 INTRM1 DRILL REAM T Wash and ream from 14726' to 15065' at 100 rpm, 500 gpm, Hole packing off. Maximum pickup 400k. Work string free 15:30 00:00 8.50 115,065 14,726 INTRM1 DRILL REAM T Back ream out of the hole from 15065' to 14726' at 500 gpm, 130 rpm, Hole packing off and topdrive stalling. Max pickup 400k PU wt. 295 SO wt. 150 ROT wt. 212 09/23/2010 BROOH f/ 14,726' to 13,144' ( worked strign thru various tight spots) - POOH on TT f/ 13,144' to 3455' - Pulling tight - BROOH f/ 3455' to 2885' - POOH on TT f/ 2885' to 798' - LD BHA - MU 3 1/2" tbg for cmt stinger & RIH on 5" DP to 10,628' J 00:00 04:30 4.50 14,726 13,144 INTRM1 DRILL REAM T Backream from 14726' to 13144', 120 rpm, 500 gpm, 2000 psi. Tight spots at 14527', 14408', 14356- 14289', 14220', 14153', 14129', 14103', 14096', 14051', 14031'. 04:30 06:00 1.50 13,144 10,773 INTRM1 DRILL TRIP T Monitor well, blow down top drive. Pull out of the hole on elevators from 13144' to 10773' 06:00 06:30 0.50 10,773 10,773 INTRM1 DRILL OWFF T Monitor well. Pump dry job. Blow down top drive 06:30 12:00 5.50 10,773 3,455 INTRM1 DRILL TRIP T Pull out of the hole on elevators from 10773' to 3455' 12:00 13:00 1.00 3,455 2,895 INTRM1 DRILL REAM T Backream out of the hole from 3455' to 2885' at 750 gpm, 2500 psi.- PU wt. 140 SO wt. 115 13:00 14:30 1.50 2,895 798 INTRM1 DRILL TRIP T Pull out of the hole on elevators from 2895' to 798' 14:30 17:30 3.00 798 0 INTRM1 DRILL PULD T Stand back HWDP and flex collars. Pull sources and download MWD - LD Geo -Pilot & MWD tools 17:30 18:15 0.75 0 0 INTRM1 DRILL RURD T Clear floor and rig up to run tubing 18:15 19:45 1.50 0 939 INTRM1 DRILL PULD T Pre -job safety meeting. Pick up and run in the hole with 30 jts (939') of 3 -1/2" tubing stinger Page 14 of 50 • • Time Logs Date From To Dur S. Depth E. Depth Phase Code Subcode T Comment 19:45 20:00 0.25 939 939 INTRMI DRILL RURD T Rig down tubing equipment and change elevators 20:00 00:00 4.00 939 10,628 INTRM1 DRILL TRIP T Run in the hole w/ cmt stinger on 5" DP f/ 939' to 10,628' 09/24/2010 Cont. RIH w/ DP & cmt stinger to 13,563' - Circ - RIH to 14,871' - String took wt. Attepmt to pull up - String stuck - Worked pipe & freed string - Pulled up to 14,805' - Set Cmt plug # 1 - Pulled up to 14,214' - Circ - Pulled up to 13,748' - Spot Hi -vis Bell pill - Pull up to 13,563' - Set cmt plug # 2(KO plug) - POOH to 12,909' - Circ - POOH w/ DP & cmt stinger to 3884' _ 00:00 01:15 1.25 10,628 13,563 INTRM1 DRILL TRIP T Continue running in the hole from 10628' to 13563' w/ 3 1/2' cmt stinger on 5' DP 01:15 03:30 2.25 13,563 13,563 INTRM1 DRILL CIRC T Circulate and condition mud at 13,563' @ 7.5 bpm & 630 psi. 03:30 05:00 1.50 13,563 14,867 INTRM1 DRILL TRIP T Cont. RIH w/ 3 1/2' cmt stinger on 5" DP f/13563' to 14871' (147 stds 5" DP + tbg stinger) - made connection w/ std # 148 - came out of slips - established circ - Began washing down f/ 14,871' - took wt @ 14,873' - Pick up 14,861' to break over pulled 300 k ( 50 k over) pipe stuck 05:00 07:00 2.00 14,867 14,805 INTRMI DRILL OTHR T Set back std # 148 & PU single f/ pipe shed - Work stuck pipe pulling up to 400 k & circulating © 10 bbls /min @ 1140 psi without success. Worked 15 k torque into string & worked pipe - string came free pulling up to 290 k 07:00 09:00 2.00 14,805 14,805 INTRM1 DRILL CIRC T POOH f/ 14,867' to 14,805' - Continue circulating and working pipe at 10 bpm 1110 psi, P/U 255k, S/O 160k, Perform static test for 5 minutes. Pipe moved at 285k, Performed 10 minute static test. Pipe moved at 300k, 09:00 10:30 1.50 14,805 14,805 INTRM1 CEMEN" CMNT T RU head pin & cmt line - Test lines to 3000 psi - w/ OE tbg @ 14,805' - Set cmt plug # 1(to isolate Kup C sand) as follows: Pumped 14 bbls - 1 12.0 ppg MudPush - Mixed & I 4 pumped 40 bbls (19Lsks - 15 R pP0 slurry) class G w/ 0.2% D046, 0.3% DO65, 0.4% D176, 0.11% B155 - Displaced to equalize w/ 2.5 bbls 12.0 ppg MudPush followed by 240 bbls 11.0 ppg LSND mud w/ rig pumps @ 10 bbls /min @ 1380 psi - slowed pumps to 4 bbls /min for last 5 bbls of displacement - CIP @ 10:25 hrs.- full returns through out the job - Calc top of cmt @ 14,384' Job calulated w/ 40 % excess) 10:30 11:00 0.50 14,805 14,214 INTRM1 DRILL TRIP T POOH f/ 14805' to 14214' (6 stds DP & LD 1 single back to pipe shed) 11:00 11:15 0.25 14,214 14,214 INTRM1 DRILL CIRC T Circulate 85 bbl 11.0 ppg LSND mud @ 12 bbls /min @ 1450 psi to clear the pipe Page 15 of 50 • Time Logs Date From To Dur S. Depth E. Depth Phase Code Subcode T Comment 11:15 11:45 0.50 14,214 13,748 INTRM1 DRILL TRIP T POOH from 14214' to 13748' 11:45 12:15 0.50 13,748 13,748 INTRM1 DRILL CIRC T Pumped 30 bbls Hi -vis gel pill & spotted w/ 220 bbls 11.0 ppg LSND mud @ 10 bbls /min @ 1150 psi - PU wt. 260 SO wt. 160 12:15 12:30 0.25 13,748 13,563 INTRM1 DRILL TRIP T POOH from 13748' to 13563' 12:30 14:00 1.50 13,563 13,563 INTRM1 CEMEN CMNT T Rig up head pin and test lines to 3000 psi.Set KO plug as follows: ci Mix and pump 14 bbls 12.0 ppg MudPush followed by 55 bbls (305 sks @ 17.0 ppg slurry) Class G w/ 1.0 % D65, 0.2% D167, 0.2% D46, 0.15% D800 - Displaced to equalize 1Z w/ 2.5 bbl MudPush & 212.5 bbl 4-.. 1 1.0 ppg LSND mud with rig pump. CIP @ 14:09 hrs 9/24/2010. Broke off head pin and fluid level in drill pipe static. Calculated TOC @ 13163' with 40% excess. 14:00 15:15 1.25 13,563 12,909 INTRM1 DRILL TRIP T Pull out of the hole on elevators from 13563' to 12909' 15:15 17:45 2.50 12,909 12,909 INTRM1 DRILL CIRC T Pump Bio -zan (30 bbl) pill and drop wiper ball. Circulate bottoms up at 12 bpm and 1290 psi 17:45 18:00 0.25 12,909 12,909 INTRM1 DRILL OWFF T Monitorwell- static. Perform 5 minute static test. P/U increased from 250k to 275k. 18:00 18:45 0.75 12,909 11,868 INTRM1 DRILL TRIP T POOH on elevators f/ 12909' to 11868' 18:45 19:00 0.25 11,868 11,868 INTRM1 DRILL OWFF T Monitor well. Pump dry job and blow down top drive 19:00 21:30 2.50 11,868 9,018 INTRM1 DRILL TRIP T POOH from 11868' to 9018' 21:30 21:45 0.25 9,018 9,018 INTRM1 DRILL OWFF T Monitor well and pump 2nd dry job. Blow down top drive 21:45 00:00 2.25 9,018 3,884 INTRM1 DRILL TRIP T POOH on elevators from 9018' to 3884' - PU wt. 125 SO wt 115 09/25/2010 Finish POOH w/ 5" DP to 939' - RU & LD 3 1/2" tbg (cmt stinger) - MU BHA # 5 Geo -Pilot - RIH to 2892' - Cut & Slip drill line /service TD - RIH to 7549' - Circ & cond. mud - RIH to 12,776' - Wash down f/ 12,776' to 13,021' - took wt.- Attempt to side track well f/ 13,021' to 13,092' - still tracking old wellbore 00:00 00:15 0.25 3,884 2,935 INTRM1 DRILL TRIP T Cont. POOH w/ 5" DP & 3 1/2' cmt stinger f/ 3884' to 2935' 00:15 01:00 0.75 2,935 939 INTRM1 DRILL TRIP T Flow ck - well static - Cont. POOH w/ 5" DP & 3 1/2" cmt stinger f/ 2935' to 939' 01:00 01:45 0.75 939 939 INTRM1 DRILL TRIP T Flow ck - well static - Chnage handling equipment f /5" to 3 1/2" -RU to pull & LD 3 1/2" cmt stinger 01:45 03:00 1.25 939 0 INTRM1 DRILL TRIP T POOH & LD 30 jts 3 1/2" tbg used for setting cmt plugs 03:00 03:45 0.75 0 0 INTRM1 DRILL PULD T Clean & clear rig floor of tbg handling equipment & bring BHA # 5 components to rigfloor Page 16 of 50 • • Time Logs Date From To Dur S. Depth E. Depth Phase Code Subcode T Comment 03:45 08:45 5.00 0 1,852 INTRMI DRILL PULD T Make up BHA and load sources. RIH to 235 and shallow test MWD. Break in Geo -pilot and run in the hole to 1852' 08:45 09:30 0.75 1,852 2,892 INTRM1 DRILL TRIP T Run in the hole from 1852' to 2892' 09:30 12:00 2.50 2,892 2,892 INTRM1 RIGMNT SLPC T Run and slip 75' of drilling line. Service rig and top drive 12:00 14:00 2.00 2,892 7,549 INTRM1 DRILL TRIP T Run in the hole from 2892' to 7549'. Fill pipe every 20 stands 14:00 15:15 1.25 7,549 7,549 INTRM1 DRILL CIRC T Circulate bottoms up 2 x 15:15 18:30 3.25 7,549 12,776 INTRM1 DRILL TRIP T Run in the hole from 7549' to 12776' P/U = 260k, S/O = 160k 18:30 00:00 5.50 12,776 13,021 INTRMI DRILL REAM T Wash and ream from 12776' to 13021'. 500 gpm @ 2100 psi, 120 rpm, 11.55 ECD - Took wt @ 13021' - Attempted to side track 13.021' to 13,092' MD 6703' TVD - 600 qpm @ 2840 psi w/ 150 rpm - ABI showing still in old wellbore 09/26/2010 Wash & ream f/ 13,092' to 13,175' - string taking wt on cmt plug - Attempt to trough & time drill - having problem getting wt. to bit - make wiper trip to 12,964' - wash & ream back to 13,144' - Performed 1000 bbl mud dilution - Prep to time drill - Observed 1600 psi pressure drop - Check out surface euqipment (all OK ) POOH on TT to 10,781' looking for wah -out ( found WO in btm jt of std 95 - replace jt.) RIH to 13,056' - Wash down to 13,175' - Control drill to 13,251'(ABI indicates getting away from old hole) Down hole tool failure - trouble shoot - POOH on TT to 10,876' 00:00 03:00 3.00 13,092 13,171 INTRM1 DRILL REAM T Wash and ream looking for firm cement from 13092' to 13171'. 600 gpm, 150 rpm. 03:00 04:30 1.50 13,151 13,171 INTRM1 DRILL DDRL T Trough from 13151' to 13171' at 500 . ipm, 1980 psi, 135 rpm, 04:30 06:15 1.75 13,171 13,175 INTRM1 DRILL DDRL T Time drill from 13171' to 13175' at 500 gpm, 1980 psi. 06:15 07:00 0.75 13,175 12,964 INTRM1 DRILL REAM T Back ream out of the hole from 13175' to 12964'. 130 rpm, 500 gpm at 1990 psi 07:00 07:30 0.50 12,964 13,144 INTRM1 DRILL REAM T Wash and ream from 12,964' to 13,144', 130 rpm, 500 gpm @ 1190 psi 07:30 09:15 1.75 13,144 13,144 INTRM1 DRILL DISP T Displace well with GIy -drill mud at 150 rpm, 500 gpm, 1920 psi 09:15 09:45 0.50 13,144 13,144 INTRM1 DRILL OTHR T Orient Geo -pilot and worked pipe 09:45 10:45 1.00 13,144 13,056 INTRM1 DRILL OTHR T Observed 1400 psi decrease in pump pressure. Clean suction screens. Stand back one stand to 13,056. Check surface circulating equipment 10:45 14:15 3.50 13,056 10,781 INTRM1 DRILL TRIP T Monitorwell- static. POOH on elevators from 13,056' to 10781'. Stand #95 in the hole and found washout in slip area of bottom joint of stand. 14:15 14:45 0.50 10,781 10,781 INTRM1 DRILL PULD T Change out single and make up top drive. Establish circulation at 750 gpm and 2950 psi to verify no more washouts. Page 17 of 50 • • Time Logs Date From To Dur S. Depth E. Depth Phase Code Subcode T Comment 14:45 16:00 1.25 10,781 13,056 INTRM1 DRILL TRIP T Run in hole from 10875' to 13056' - PU wt. 260 SO wt. 160 16:00 16:45 0.75 13,057 13,175 INTRM1 DRILL REAM T Establish circulation - Obtain SPR's - wash from 13,056' to 13175' at 625 gpm, 3080 psi, 150 rpm, 11.41 ppg ECD 16:45 19:15 2.50 13,175 13,251 INTRM1 DRILL DDRL T Control drill to sidetrack well off cmt. plug f/ 13,175' to 13,251' MD 6762' ADT ADT- 1.82 hrs ECD - 11.45 ppg Footage - 76' WOB 10/15 k RPM 150 GPM 650 @ 2950 psi * Note - Kick -off depth 13,205' 19:15 20:15 1.00 13,251 13,251 INTRM1 DRILL DHEQ T Trouble shoot MDW / Geo -pilot - Pumping 600 gpm @ 2860 psi w/ 60 rpm's - torque 23 k - ECD- 11.43 ppg - Blow down TD 20:15 20:30 0.25 13,251 13,251 INTRMI DRILL OWFF T Monitor well - Static 20:30 21:15 0.75 13,251 12,301 INTRM1 DRILL TRIP T POOH f/ 13,251' to 12,301 on TT - PU wt. 250 SO wt. 160 21:15 21:30 0.25 12,301 12,301 INTRMI DRILL OWFF T Monitor well - Static 21:30 22:00 0.50 12,301 12,301 INTRM1 DRILL DHEQ T Trouble shoot MWD -600 gpm @ 2660 psi w/ 60rpm's - torque 16.5 k - ECD - 11.43 ppg - Blow down TD 22:00 23:15 1.25 12,301 10,876 INTRM1 DRILL TRIP T POOH on TT f/ 12,301' to 10,876' - PU wt. 240 SO wt. 150 23:15 00:00 0.75 10,876 10,876 INTRM1 DRILL OWFF T Monitor well ( static - Pump dry job - Blow down TD 09/27/2010 POOH f/ 10,876 to 2892' ( pulled on TT to 6314' - BROOH & Pulled on TT working various tight spots f/ 6414' to 2892') Circ btms up @ 2892' - POOH on TT - LD BHA - MU BHA # 6 00:00 02:45 2.75 10,876 6,314 INTRMI DRILL TRIP T POOH on elevators from 10876' to 6314' 02:45 05:00 2.25 6,314 6,044 INTRM1 DRILL REAM T Back ream out of the hole from 6314' to 6044'. Tight spots at 6264', 6236', 6205', 6191', 6044'. 100 rpm, 550 gpm, 1700 p 05:00 06:15 1.25 6,044 6,044 INTRM1 DRILL REAM T Work tight hole at 6044' - Unable to work past 6044' 06:15 06:45 0.50 6,044 6,504 INTRM1 DRILL TRIP T Run in the hole from 6044' to 6504' 06:45 07:45 1.00 6,504 6,694 INTRM1 DRILL REAM T Wash and ream from 6504' to 6694' to work ghost reamer through tight spot at 6044' 07:45 08:15 0.50 6,694 6,504 INTRM1 DRILL REAM T Backream from 6694' to 6504'. 08:15 09:15 1.00 6,504 5,744 INTRM1 DRILL TRIP T Monitor well- static. POOH on elevators from 6504' to 5744'. * Note - came through tight spot @ 6044' with little resistance 09:15 09:45 0.50 5,744 5,649 INTRM1 DRILL REAM T Back ream out of the hole from 5744' to 5649'. Tight spots at 5707' and 5663' Page 18 of 50 • • Time Logs Date From To Dur S. Depth E. Depth Phase Code Subcode T Comment 09:45 10:30 0.75 5,649 4,938 INTRMI DRILL TRIP T Monitor well- static. Blow down topdrive and trip out of the hole on elevators from 5649' to 4938'. 10:30 14:00 3.50 4,938 2,892 INTRMI DRILL REAM T Backream out of the hole from 4938' to 2892'. 14:00 14:15 0.25 2,892 2,892 INTRM1 DRILL OWFF T Monitor well-static 14:15 14:30 0.25 2,892 2,892 INTRMI DRILL CIRC T CBU at 550gpm, 1650 psi. Blowdown top drive 14:30 16:00 1.50 2,892 798 INTRMI DRILL TRIP T POOH on elevators from 2892' to 798' 16:00 16:15 0.25 798 798 INTRM1 DRILL OWFF T Monitor well- static 16:15 19:30 3.25 798 0 INTRM1 DRILL PULD T Stand back HWDP. Pull RA sources. Lay down BHA. Download MWD. Break bit and laydown Geo -pilot 19:30 20:00 0.50 0 0 INTRM1 DRILL OTHR T Clear floor and clean drip pan under rotary table (Target Zero) 20:00 21:30 1.50 0 127 INTRM1 DRILL PULD T Make up Geo -pilot BHA 21:30 22:00 0.50 127 127 INTRM1 DRILL PULD T Plug in and upload MWD 22:00 22:30 0.50 127 191 INTRMI DRILL PULD T Continue making up BHA and pulse / test VV 22:30 22:45 0.25 191 95 INTRM1 DRILL SFTY T Safety meeting on handling nuclear sources 22:45 00:00 1.25 95 127 INTRM1 DRILL PULD T Load nuclear sources and continue making up BHA 09/28/2010 RIH to 2891' - Slip & cut DL - RIH to 7833' - Circ & cond. mud - RIH to 13,056' - Wash & ream f/ 13,056' to 13,251' - Drilled 9 7/8" hole w/ GP f/ 13,251' to 13,881' - Lost 700 psi pump pressure - Trouble shoot problem - Circ w/ pump # 1 while repairing pump # 2 00:00 01:00 1.00 127 1,851 INTRMI DRILL TRIP T Cont. MU BHA # 6 - PU Well Commander circ sub w/ ball catcher & 2 9 7/8' ghost reamers to 1851' 01:00 02:00 1.00 1,851 2,891 INTRMI DRILL TRIP T RIH w/ BHA # 6 f/ 1851' to 2891' - break in Geo -Pilot bearings - fill pipe & check MWD tools @ 500 gpm @ 1650 psi 02:00 03:30 1.50 2,891 2,891 INTRM1 RIGMNT SLPC T PJSm - Slip & cut drill line (45') Monitor well on TT - 03:30 06:30 3.00 2,891 7,833 INTRM1 DRILL TRIP T RIH w// BHA # 6 f/ 2891' to 7833' (filling pipe every 20 stds) 06:30 07:15 0.75 7,833 7,833 INTRMI DRILL CIRC T Fill pipe & establish circ - Circ Btms up & condition mud @ 675 gpm @ 2840 psi w/ 140 rpm's - torque 13 k 07:15 10:15 3.00 7,833 13,056 INTRM1 DRILL TRIP T Cont. RIH w/ BHA # 6 f/ 7833' to 13,056' filling pipe every 20 stds) 10:15 12:00 1.75 13,056 13,251 INTRM1 DRILL WASH T Establish circ - Wash & ream f/ 13,056' to 13,251' I I Page 19of50 • • Time Logs Date From To Dur S. Depth E. Depth Phase Code Subcode T Comment 12:00 21:30 9.50 13,251 13,881 INTRM1 DRILL DDRL T Directionally Drilled 9 7/8" hole w/ GP f/ 13,251' to 13,881' MD 6998' TVD TVD = 6998' ADT- 7.03 hrs ECD 11.47 ppg Footage 630' WOB 12/16 k RPM 150 GPM 650 © 3270 psi String wt. PU 285 SO 165 ROT 210 Torque on /off btm.- 22,500/16,500 ft/Ibs 21:30 22:45 1.25 13,881 13,705 INTRM1 DRILL OTHR T Trouble shoot pressure loss. - Std back lstd DP to 13,705' - Found problem with pump # 2 22:45 00:00 1.25 13,705 13,705 INTRM1 DRILL OTHR T Isolate #2 mud pump - Circulate with #1 mud pump @ 80 spm © 1110 psi w/ 80 rpm's torque 16.5 k - Repair pump # 2 - Found broken valve spring retainer 09/29/2010 Drilled 9 7/8" hole w/ GP f/ 13,881' to 15,753' 00:00 12:00 12.00 13,881 14,751 INTRM1 DRILL DDRL T Drilled 9 7/8" hole w/ GP f/ 13881' to 14751' MD (7254' TVD) ADT- 7.12 hrs ECD- 12.43 ppg Footage- 870' ✓/ WOB 10/20 k RPM 150 GPM 650 @ 3080 psi String wt. PU 295 SO 152 ROT 205 Torque on /off btm.- 22,000/16,500 ft/Ibs Geo picks - Top of HRZ - 13,560' - Base of HRZ - 14,155' - K -1 marker 14,365' - LCU 14,650' 12:00 00:00 12.00 14,751 15,753 INTRM1 DRILL DDRL T Drilled 9 7/8" hole w/ GP f/ 14 751' to 15.753' MD 7405' TVD ADT- 7.93 hrs ECD- 12.05 ppg Footage- 1,002' WOB 10/15 k RPM 150 GPM 670 @ 3760 psi String wt. PU 305 SO 150 ROT 210 Torque on /off btm.- 22,000/16,000 ft/Ibs 09/30/2010 Drilled 9 7/8" hole w/ GP f/ 15,783' to 16,800' (TD 9 7/8" section) Circ 4 X btms. up (Std back 1 std DP after each BU) to 16,405' - Made wiper trip f/ 16,405' to 15,292' w/ No pump or rotary - worked thru various tight spots II I Page 20 of 50 • Time Logs Date From To Dur S. Depth E. Depth Phase Code Subcode T Comment 00:00 12:00 12.00 15,753 16,685 INTRM1 DRILL DDRL T Drilled 9 7/8" hole w/ GP f/15753' to 16685' MD (7516' TVD) ADT- 6.91 hrs. ECD - 12.24 ppg Footage- 932' WOB 10/18 k RPM 150 GPM 650 @ 3590 psi String wt. PU 315 SO 135 ROT 215 Torque on /off btm.- 22,500/18,000 ft/Ibs 12:00 13:15 1.25 16,685 16,800 INTRM1 DRILL DDRL P Drilled 9 7/8' hole w/ GP f/ 16,685' to 16.800' MD 7527' TDV, ADT- 1.03 hrs. ECD- 12.18 ppg Footage- 115' WOB 8/12 k RPM 150 GPM 620 @ 3460 psi String wt. PU 320 SO 140 ROT 215 Torque on /off btm.- 21,500/17,000 ft/Ibs 13:15 17:15 4.00 16,800 16,405 INTRM1 DRILL CIRC P Ciculate bottoms up 4 x @ 650 gpm, 3600 psi, 150 rpm, Torque 19 k ECD - 11.89 ppg - Rack back a stand after each bottoms up. 17:15 19:30 2.25 16,405 16,405 INTRMI DRILL OWFF P Monitor well- static 19:30 00:00 4.50 16,800 15,292 INTRM1 DRILL WPRT P POOH on elevators from 16405' to 15292'. P/U = 320, S/0 = 140k - Numerous tight spots. 13120', 15660', 15630'- 15320', 15583', 15555- 15540', 15500', 15475', 15460'- 15450' 10/01/2010 Cont. w. wiper trip f/ 15,292' to 14,546' (working thru numberous tight spots) Circ btms up © 14,546' - TIH f/ 14,546' to 15,401' - working thru various tight spots ( unable to work past 15,401' - Pulled back to 15,383' - Washed down 16,155' - Washed & reamed down f/ 16,155' to 16,800' - Circ btms up - Circ & began increasing mud wt. f/ 11.5 ppg to 12.0 ppg 00:00 05:15 5.25 15,292 14,457 INTRM1 DRILL WPRT P Pull out of the hole on elevators from 15292' to 14457' - Working thru numberous tight spot all the way - Hung up at 15015'. Attempt to jar down w/o success. Work torque into pipe to free pipe. PU wt 285 SO WT 150 05:15 07:45 2.50 14,457 15,401 INTRM1 DRILL CIRC P CBU @ 14,546' - 550 gpm @ 2560 psi w/ 50 rpm's - Monitor well- static. Blowdown top drive 07:45 10:00 2.25 15,401 15,401 INTRM1 DRILL CIRC P Run in the hole from 14457' to 15401' - Working thru various tight sopts - Unable to work past 15,401' - PU wt. 295 SO wt 10:00 12:00 2.00 15,401 15,567 INTRM1 DRILL WASH P Work pipe back f/ 15,401' to 15,383' - Establish circ - Wash down f/ 15,383 to 15567' at 5 bpm, 670 psi. P/U = 290k, S/0 = 152k 12:00 14:15 2.25 15,567 16,155 INTRM1 DRILL WASH P Continue washing down f/ 15567' to 16155' @ 5 bbls /min @ 670 psi - PU wt 300 SO wt 140 Page 21 of 50 • Time Logs Date From To Dur S. Depth E. Depth Phase Code Subcode T Comment 14:15 21:30 7.25 16,155 16,800 INTRM1 DRILL REAM P Wash and ream from 16155' to 16800'. at 650 gpm, 3450 psi, 140 rpm - torque 19 k 21:30 23:00 1.50 16,800 16,800 INTRMI DRILL CIRC P CBU at 625 gpm, 3300 psi, 140 rpm - toruqe 20 k - working pipe 85' 23:00 00:00 1.00 16,800 16,800 INTRM1 DRILL CIRC P Circulate and increase mud weight f/ 11.5 ppg to 12.0 ppg. at 625 gpm, 3380 psi. 10/02/2010 Cont. to weight up to 12.0 ppg - Attempt to pull on elevators ( pulling tight & having to rotate to break free) BROOH f/ 16,770' to 15,676' @ 550 gpm @ 3040 psi w/ 140 rpm's - Packed off & lost returns - regain circulation - Circ & lower mud wt to 11.8 pp. @ 15,763' - BROOH f/ 15763" to 14,825' ( 330 gpm @ 1200 psi) 00:00 05:30 5.50 16,800 16,800 INTRM1 DRILL CIRC P Circulate and increase mud weight to 12.0 ppg at 600 qpm, 3460 psi. 05:30 06:00 0.50 16,800 16,770 INTRMI DRILL TRIP P Lay down a single and blowdown top drive. Attempt to POOH on elevators - Pulling tight - Had to rotate to break free 06:00 09:45 3.75 16,770 15,676 INTRM1 DRILL REAM P Back ream out of the hole from 16770' to 15676' at 550 gpm, 3040 psi, 140 rpm 09:45 10:30 0.75 15,676 15,676 INTRMI DRILL CIRC P Packed off at 15676' and lost circulation. Established circulation at 4 bpm 540 psi 10:30 17:30 7.00 15,676 15,676 INTRM1 DRILL CIRC P Circulate and reduce mud weight to 11.8 ppg @ 4 bpm, 540 psi, 60 rpm, Increase rate to 8 bpm @ 1310 psi, 70 rpm, 12.53 ppg ECD 17:30 00:00 6.50 15,676 14,825 INTRMI DRILL REAM P Backream out of the hole from 15676' to 14825 @ 8 bpm, 1200 psi, 80 rpm - torque 18 k - Rot wt. 210 k - ECD - 12.15 ppg 10/03/2010 BROOH from 14825' to 13521' (above HRZ). Circulate and condition mud. POOH on elevators from 13521' to 11159'. BROOH from 11159' to 10399' 00:00 07:00 7.00 14,825 13,521 INTRM1 DRILL TRIP P Cont. BROOH f/ 14,825' to 13,521' (above HRZ) @ 8 bbls /min 1190 psi @ 80 rpm's - Rot wt 210 k - torque 17 k 07:00 08:30 1.50 13,521 13,521 INTRM1 DRILL CIRC P Circ btms up to balance mud - 450 gpm @ 1880 psi w/ 80 rpm's 08:30 08:45 0.25 13,521 13,521 INTRM1 DRILL OWFF P Monitor well - slight loss 08:45 12:00 3.25 13,521 11,159 INTRM1 DRILL TRIP P POOH on elevators from 13521' to 11159' 12:00 00:00 12.00 11,159 10,399 INTRM1 DRILL REAM P Backream out of the hoole from 11159' to 10399'. 6 bpm up to 10.5 bpm, 120 rpm, 10/04/2010 Cont. BROOH f/10,399' to 2989'( made 2 attempts to pull on elevators No good) Flow ck (slight static loss) Circ btms up - Flow ck (slight static loss) POOH on TT to 2416' (improper hole fill) POOH w/ pump to 2036' 00:00 01:45 1.75 10,399 9,734 INTRM1 DRILL REAM P Cont. BROOH f/ 10.399' to 9734' @ 450 gpm © 1700 psi w/ 120 rpm's - Rot wt. 175 - Togque 14 k 01:45 02:00 0.25 9,734 9,734 INTRM1 DRILL TRIP P Blow down TD - Attempt to POOH on elevators - pulling 50 to 75 k over 02:00 21:15 19.25 9,734 2,891 INTRM1 DRILL REAM P Cont. BROOH f/ 9734' to 2891' at 550 gpm, 1700 psi, 100 rpm, and slight losses Page 22 of 50 • Time Logs Date From To Dur S. Depth E. Depth Phase Code Subcode T Comment 21:15 22:00 0.75 2,891 2,891 INTRM1 DRILL CIRC P Circulate and condition mud until shakers cleaned up. 55gpm, 1680 psi. Blowdown top drive and geo -span. Lay down geo -span. 22:00 22:15 0.25 2,891 2,891 INTRM1 DRILL OWFF P Monitor well - slight loss 22:15 23:00 0.75 2,891 2,416 INTRMI DRILL TRIP P POOH on elevators from 2891' to 2416'. Hole not taking proper fill 23:00 00:00 1.00 2,416 INTRMI DRILL REAM P Pump out of the hole from 2416' to XXXX' at 8 bpm 680 psi. 10/05/2010 Finish tripping out of the hole. Laydown BHA. Rig up and test BOPE. Make up clean out BHA. Cut and slip 60' of drilling line. Run in the hole to 3555' 00:00 00:30 0.50 2,036 1,654 INTRMI DRILL TRIP P Pump out of the hole from 2036' to 1654'. 00:30 00:45 0.25 1,654 1,559 INTRMI DRILL TRIP P Blow down top drive and pull out of the hole on elevators from 1654' to 1559'. Hole not taking proper fill 00:45 01:15 0.50 1,559 1,083 INTRM1 DRILL TRIP P Pump out of the hole from 1559' to 1083' 01:15 01:45 0.50 1,083 1,083 INTRMI DRILL OWFF P Monitor well - slight loss 01:45 02:15 0.50 1,083 797 INTRMI DRILL TRIP P Pump out of the hole from 1083' to 797' 02:15 02:45 0.50 797 546 INTRM1 DRILL TRIP P Monitor well - static and stand back 3 stands of HWDP 02:45 03:30 0.75 546 234 INTRM1 DRILL TRIP P Pump out of the hole from 546' to 234' 03:30 05:00 1.50 234 90 INTRMI DRILL PULD P Lay down BHA, 3 flex collars, circ sub, ball catcher, and pull nuclear sources. Lay down float collar and sonic collar 05:00 06:30 1.50 90 90 INTRM1 DRILL PULD P Download MWD 06:30 07:45 1.25 90 0 INTRM1 DRILL PULD P Continue laying down BHA 07:45 08:30 0.75 0 0 INTRMI DRILL PULD P Clear rig floor 08:30 09:00 0.50 0 0 INTRM1 WHDBO BOPE P Pull wear ring and set test plug 09:00 09:15 0.25 0 0 INTRM1 WHDBO SFTY P Pre -job safety meeting on testing BOPE 09:15 15:30 6.25 0 0 INTRM1 WHDBO BOPE P Test BOPE. Annular to 250/2500 psi. All other components to 1./0() 250/3500 psi. Blow down choke and 1 kill lines. Pull test plug. Chuck Scheve, AOGCC waived witnessing the BOP test 15:30 16:00 0.50 0 0 INTRMI WHDBO BOPE P Set wear ring 16:00 17:30 1.50 0 0 INTRMI DRILL PULD P Make up clean out BHA 17:30 17:45 0.25 0 120 INTRM1 DRILL DHEQ P Shallow pulse test at 9 bpm, 330 psi, blow down top drive 17:45 19:45 2.00 120 2,889 INTRM1 DRILL TRIP P Run in the hole from derrick to 2889'. 19:45 21:15 1.50 2,889 2,889 INTRM1 DRILL CIRC P Fill pipe and pressure test mud pump to 3500 psi (Pulsation dampener bladder had been replaced) Circulate and condition mud. Blow down top drive Page 23 of 50 • Time Logs Date From To Dur S. Depth E. Depth Phase Code Subcode T Comment 21:15 21:30 0.25 2,889 2,889 INTRMI RIGMNT SFTY P Pre -job safety meeting on cutting and slipping drilling line 21:30 22:45 1.25 2,889 2,889 INTRM1 RIGMNT SLPC P Cut and slip 60' drilling line. Service rig and top drive 22:45 00:00 1.25 2,889 3,555 INTRM1 DRILL TRIP P Run in the hole from 2889' to 3555' 10/06/2010 Continue running in the hole from 3555' to 7737'. Circulate and condition mud. Run in the hole from 7737' to 10398'. Circulate and condition mud. Run in the hole from 10398' to 13519' and circulate and condition mud. Run in the hole from 13519' to 14700' and hole got tight. Racked 1 stand back and cirulated and conditioned mud. Washed and reamed from 14635' to 15565'. Continue washing to bottom. 00:00 03:45 3.75 3,555 7,737 INTRMI DRILL TRIP P Continue tripping in the hole from 3555' to 7737'. Filled pipe every 20 stands 03:45 05:15 1.50 7,737 7,737 INTRM1 DRILL CIRC P Circulate and condition mud at 12 bpm, 1450 psi 05:15 07:15 2.00 7,737 10,398 INTRM1 DRILL TRIP P Run in the hole from 7737' to 10398' , 07:15 09:15 2.00 10,398 10,398 INTRM1 DRILL CIRC P Circulate and condition mud at 12 bpm, 1520 psi. 09:15 12:00 2.75 10,398 13,519 INTRM1 DRILL TRIP P Continue tripping in the hole from 10398' to 13519' 12:00 13:30 1.50 13,519 13,519 INTRM1 DRILL CIRC P Circulate and condition mud at 500 gpm, 1970 psi. 13:30 14:45 1.25 13,519 14,635 INTRM1 DRILL TRIP P Trip in the hole from 13519' to 14700'. Tight spots at 14380', 14427' able to work through without pumping. Hit tight spot at 14700' unable to work through. Stand back one stand. 14:45 17:00 2.25 14,635 14,635 INTRM1 DRILL CIRC P Circulate and condition mud at 500 gpm, 1970 psi. 17:00 00:00 7.00 14,635 15,565 INTRM1 DRILL REAM P Wash and ream from 14635' to 15565' at 500 gpm, 2130 psi 10/07/2010 Ran in to 16800'. Packed off. Established returns and circulated and conditioned mud. Raised mud weight to 12.0 ppg. Backed reamed out of the hole from 16800' to 15938' 00:00 05:45 5.75 15,565 16,665 INTRM1 DRILL REAM P Wash and ream from 15565' to 16665' at 500 gpm, 2000 psi. Packed off at 16665' 05:45 08:30 2.75 16,665 16,665 INTRM1 DRILL REAM P Establish circulation and work through pack off. Stage pumps to 5 bpm, 670 psi 08:30 10:30 2.00 16,665 16,800 INTRM1 DRILL REAM P Washh and ream from 16665' to 16800' while staging pumps up to 10 bpm 1590 psi. 10:30 11:30 1.00 16,800 16,800 INTRM1 DRILL CIRC P Circulate and condition mud. Stage pumps up to 500 gpm, 2150 psi. 11:30 15:30 4.00 16,800 16,800 INTRM1 DRILL CIRC P Circulate and increase mud weight up to 12.0 ppg at 500 gpm, 2190 psi. Blow down top drive 15:30 15:45 0.25 16,800 16,800 INTRM1 DRILL OWFF P Monitor well - static 15:45 21:30 5.75 16,800 16,500 INTRM1 DRILL REAM P Attempt to POOH on elevators. Pulled tight. Back reamed out of the hole from 16775' to 16500' at 500 gpm, 1950 psi. Page 24 of 50 • • Time Logs Date From To Dur S. Depth E. Depth Phase Code Subcode T Comment 21:30 00:00 2.50 16,500 15,938 INTRM1 DRILL REAM P Attempt to POOH on elevators. Pulled tight. Back reamed out of the hole from 16500' to 15938' at 500 gpm, 1950 psi. 10/08/2010 Continue BROOH from 15938' to 14451'. Circulate and condition mud. Run in hole to 15628'. Circulate and condition mud. Wash from 15628' to 15845' at 5 bpm and washed from 15845' to 16800' at 6 bpm. CBU and BROOH from 16800' to 16126' 00:00 07:45 7.75 15,938 14,451 INTRMI DRILL REAM P Continue back reaming from 15938' to 14451'. at 500 gpm, 1970 psi. Tight at 14702', 14654', 14591' 07:45 09:30 1.75 14,451 14,451 INTRM1 DRILL CIRC P Circulate and condition mud at 500 gpm, 1970 psi. 09:30 09:45 0.25 14,451 14,357 INTRM1 DRILL TRIP P Blowdown top drive and pull one stand on elevators to 14357' 09:45 12:00 2.25 14,357 15,628 INTRMI DRILL TRIP P Run in hole on elevators from 14357' to 15628'. Hit bridge 12:00 13:15 1.25 15,628 15,628 INTRMI DRILL CIRC P Establish circulation and stage pumps up to 5 bpm, 600 psi. 13:15 18:30 5.25 15,628 16,800 INTRM1 DRILL WASH P Wash from 15628' to 15845' at 5 bpm and 600 psi. Increase rate to 6 bpm and wash to 16800' 18:30 21:00 2.50 16,800 16,800 INTRMI DRILL CIRC P Circulate bottoms up at 80 spm, 1140 psi. 21:00 00:00 3.00 16,800 16,126 INTRM1 DRILL REAM P Attempt to pump out of the hole without success. Back ream out of the hole from 16800' to 16126' 10/09/2010 BROOH from 16126' to 15875'. RIH from 15875' to 16288'. Wash and ream from 16288' to 16800'. Circulate and condition mud. Pump out of the hole from 16800' to 14357' spotting 178 bbl Casing Running Pill. Back ream out of the hole from 14357' to 11824'. POOH on elevators from 11824'. 00:00 01:00 1.00 16,126 15,875 INTRMI DRILL REAM P Backream out of the hole from 16126' to 15875' at 5 bpm, 620 psi, 70 rpm 01:00 01:30 0.50 15,875 16,288 INTRM1 DRILL TRIP P Blow down top drive and run in the hole from 15875' to 16288'. 01:30 04:30 3.00 16,288 16,800 INTRM1 DRILL REAM P Wash and ream (tight spot at 16288') to 16800' at 6 bpm, 770 psi, 60 rpm, 04:30 09:00 4.50 16,800 16,800 INTRMI DRILL CIRC P Circulate and condition mud at 7 bpm, 920 psi, 60 rpm, Spot 178 bbl Casing Running Pill 09:00 12:30 3.50 16,800 14,650 INTRMI DRILL TRIP P Pump out of the hole laying CRP from 16800' to 14650' 12:30 17:30 5.00 14,650 11,824 INTRM1 DRILL REAM P Back ream out of the hole from 14650' to 11824'. at 2 bpm, 350 psi, and 60 rpm. Appeared to be sticking differentially at 14367' and 13519' when trying to POOH on elevators 17:30 00:00 6.50 11,824 2,891 INTRMI DRILL TRIP P POOH on elevators from 11824' to 2891' 10/10/2010 Circulate and Condition Mud - POOH on Elevators t/ 151' MD - UD BHA #7 (Clean Out) - Change Top Rams and Test t/ 250/3500 Psi - R/U and Run 7 5/8" Casing per Detail t/ 5,773' MD (138 Jts) Stopping to Condition Mud @ 2,923' and 5,020' MD 00:00 00:30 0.50 2,891 2,891 INTRM1 DRILL OWFF P OWFF (static) 00:30 01:15 0.75 2,891 2,891 INTRMI DRILL CIRC P Circ and Condition Mud @ 500 GPM w/ 1040 Psi; 120 RPM ECD = 12.35 Page 25 of 50 • • Time Logs Date From To Dur S. Depth E. Depth Phase Code Subcode T Comment 01:15 01:30 0.25 2,891 2,891 INTRM1 DRILL OWFF P OWFF (Static) - Blow Down Top Drive 01:30 02:45 1.25 2,891 709 INTRM1 DRILL TRIP P POOH on TT t/ 709' MD 02:45 03:00 0.25 709 709 INTRM1 DRILL OWFF P OWFF (Static) 03:00 03:30 0.50 709 151 INTRMI DRILL TRIP P POOH Standing Back HWDP t/ 151' MD 03:30 04:00 0.50 151 106 INTRM1 DRILL PULD P UD NMFDC's, Well Cmdr Circ Sub and Ball Catcher 04:00 04:30 0.50 106 106 INTRM1 DRILL PULD P Download MWD Data 04:30 06:00 1.50 106 0 INTRM1 DRILL PULD P LID Remaining Clean Out (BHA #7) Tools 06:00 07:00 1.00 0 0 INTRM1 DRILL RURD P UD BHA Handling Equipment - Clear and Clean the Rig Floor 07:00 07:15 0.25 0 0 INTRMI WHDBO SFTY P PJSM on Changing Upper Rams 7s 07:15 08:00 0.75 0 0 INTRM1 WHDBO NUND P Change TOD Rams f/ 3 1/2" X 6" to 7, 5/8" 08:00 08:30 0.50 0 0 INTRM1 WHDBO RURD P Pull Drilling Wear Ring and Install BOPE Test Plug 08:30 09:15 0.75 0 0 INTRM1 WHDBO BOPE P _ Test Top Rams t/ 250/3500 Psi 09:15 09:45 0.50 0 0 INTRMI WHDBO RURD P Pull BOPE Test Plug and Install Casing Running Wear Ring 09:45 12:45 3.00 0 0 INTRM1 CASING RURD P R/U to Run 7 5/8" Casing 12:45 13:00 0.25 0 0 INTRMI CASING SFTY P PJSM on Running 7 5/8" Casing 13:00 18:00 5.00 0 2,923 INTRM1 CASING RNCS P Run 5 Jts 7 5/8" Casing - Filled Pipe & Checked Floats - Continue to Run Casing Centralized per the Detail t/ 2,923' MD (70 Jts) 18:00 19:00 1.00 2,923 2,923 INTRM1 CASING CIRC P Circ & Condition Mud @ 5 BPM w/ 180 Psi 19:00 21:45 2.75 2,923 5,020 INTRMI CASING RNCS P Continue to Run Casing per Detail t/ 5020' MD (40 Jts - 120 Total) 21:45 22:45 1.00 5,020 5,020 INTRMI CASING CIRC P CBU Staging Pumps Up t/ 5 BPM w/ 280 Psi 22:45 00:00 1.25 5,020 5,773 INTRM1 CASING RNCS P Continue to Run Casing per Detail t/ 5773' MD (18 Jts - 138 Total) 10/11/2010 Continue to run 7 5/8" casing to 15,623' MD (214 jts. - 374 total) Stopping to condition mud @ 6695', 8365, 10,038', 11,703', 13,371' MD 00:00 01:15 1.25 5,773 6,695 INTRM1 CASING RNCS P Continue to Run Caisng per Detail t/ 6695 MD (22 Jts - 160 Total) 01:15 02:30 1.25 6,695 6,695 INTRM1 CASING CIRC P Circ and Condition Mud Staging Pumps Up t/ 5 BPM @ 295 Psi 02:30 05:30 3.00 6,695 8,365 INTRM1 CASING RNCS P Continue to Run Casing per Detail t/ 8,365' MD (40 Jts - 200 Total) 05:30 07:30 2.00 8,365 8,365 INTRM1 CASING CIRC P Circ and Condition Mud Staging Pumps Up t/ 5 BPM @ 360 Psi 07:30 10:45 3.25 8,365 10,038 INTRM1 CASING RNCS P Continue to Run Casing per Detail t/ 10,038' MD (40 Jts - 240 Total) 10:45 12:45 2.00 10,038 10,038 INTRM1 CASING CIRC P Circ and Condition Mud Staging Pumps Up t/ 5 BPM @ 420 Psi 12:45 15:15 2.50 10,038 11,703 INTRM1 CASING RNCS P Continue to Run Casing per Detail t/ 11,703' MD (40 Jts - 280 Total) 15:15 17:00 1.75 11,703 11,703 INTRM1 CASING CIRC P Circ and Condition Mud Staging Pumps Up t/ 5 BPM @ 420 Psi Page 26 of 50 • Time Logs Date From To Dur S. Depth E. Depth Phase Code Subcode T Comment 17:00 19:00 2.00 11,703 13,371 INTRM1 CASING RNCS P Continue to Run Casing per Detail t/ 13,371' MD (40 Jts - 320 Total) 19:00 21:15 2.25 13,371 13,371 INTRMI CASING CIRC P Circ and Condition Mud Staging Pumps Up t/ 5 BPM @ 450 Psi 21:15 00:00 2.75 13,371 15,623 INTRM1 CASING RNCS P Continue to Run Casing per Detail t/ 15,623' MD (54 Jts - 374 Total) 10/12/2010 Continue to Run/Wash 7 5/8" Casing t/ 16,784' MD - Circ and Condition Mud Prior to Cementing - Cement Casing in 2 Stages w/ 302 Bbls of 15.8 PPG Alpine Intermediate Tail Cement f/ 16,784' - 11,201' MD and 59 Bbls 15.8 PPG Alpine Surface Tail Cement f/ 7,083' - 5,977' MD - Set 7 5/8" Pack -Off and Test U 5,000 Psi f/ 10 Minutes - LID 5" DP (40 Stands) 00:00 00:30 0.50 15,623 15,934 INTRMI CASING RNCS P Continue to Run Caisng per Detail t/ 15,934' MD (6 Jts - 381 Total) 00:30 06:30 6.00 15,934 16,784 INTRM1 CASING RNCS T Casing Took Weight © 15,934' MD - Attempt to Work String w/o Pumps (Unsuccessful) - Stage Pumps Up t/ 5 BPM and Work Through Obstruction - Continue to Wash Casing Down @ 5 BPM (Tight Spots) t/ 16,784' MD 06:30 07:15 0.75 16,784 16,784 INTRM1 CEMEN' RURD P R/D Casing Equipment and R/U Cement Head and Lines 07:15 11:15 4.00 16,784 16,784 INTRMI CEMEN" CIRC P Circ and Condition Mud for Cementing 11:15 11:30 0.25 16,784 16,784 INTRM1 CEMEN P PJSM on Cementing Intermediate Casing 11:30 12:00 0.50 16,784 16,784 INTRMI CEMEN" CIRC P Continue to Circ and Condition Mud for Cementing 12:00 12:15 0.25 16,784 16,784 INTRM1 CEMEN "SFTY P PJSM on Cementing Intermediate Casing w/ New Crew Page 27 of 50 • Time Logs Date From To Dur S. Depth E. Depth Phase Code Subcode T Comment 12:15 17:45 5.50 16,784 16,784 INTRMI CEMEN P Cement Intermediate Casino in Two Stages as Follows: Pumped 5 Bbls CW100, Pressure Test Lines t/ 4000 Psi, Pumped 45 Bbls CW100 and 35 Bbls Mud Push II, Dropped 1st Plug, Pumped 5 Bbls Mud Push II and 302 1 'e Bbls 15.8 PPG Intermediate Tail G"1 Cement, Dropped 2nd Plug, Pumped ' 20 Bbls of Fresh Water w/ Dowell skw° Unit - Displaced Cement w/ 745.8 Bbls of 12 PPG LSND Mud (3 BPM w/ 500 Psi) - Hold 1100 Psi - Released Pressure and Checked Floats (Good) - CIP 1515 hrs Loaded Closing Plug in Cement Head - Pressured up t/ 3590 Psi to Open HES Stage Collar - CBU @ 7 BPM w/ 430 Psi - Pumped 20 Bbls CW100, 32 Bbls Mud Push II and 59 r Bbls of 15.8 PPG Surface Tail Zl Cement - Dropped Closing plug and r Pumped 20 Bbls of Fresh Water w/ Dowell Unit - Displaced 2nd Stage Cement w/ 306.5 Bbls of 12 PPG LSND Mud - Observed Stage Collar Close w/ 1120 Psi - Increased Pressure t/ 1590 Psi and Held f/ 5 Minutes - CIP 1745 17:45 18:30 0.75 16,784 16,784 INTRMI CEMEN RURD P Blow Down and R/D Cement Head 18:30 19:00 0.50 16,784 16,784 INTRM1 WHDBO OTHR P Pull Wear Ring and Set 7 5/8" Pack Off & Test t/ 5,000 Psi f/ 10 Minutes - Set Wear Ring and 19:00 19:30 0.50 16,784 16,784 INTRM1 DRILL RURD P Change Bales and R/U to UD 5" DP f/ the Derrick 19:30 22:00 2.50 16,784 16,784 INTRM1 DRILL PULD P PJSM - UD 5" DP via the Mouse Hole (25 Stands) 22:00 23:00 1.00 16,784 16,784 INTRM1 RIGMNT SLPC P PJSM/ Slip and Cut 120' Drill Line 23:00 00:00 1.00 16,784 16,784 INTRM1 DRILL PULD P Continue to L/D 5" DP via the Mouse Hole (15 Stands - 40 Total) 10/13/2010 Continue to UD 5" DP f/ the Derrick (176 Stands Total): SIMOPS Conduct LOT on OA, Leak Off Occurred at 15.9 PPG EMW, Flushed Annulus w/ 300 Bbls Fresh Water and Freeze Protected w/ 70 Bbls Diesel - Change Upper Rams to 3 YZ' by 6" Variables - R/U and Test BOPE w/ 4" & 4 1 /2' Test Joints; Auto IBOP Failed Test - Replace Auto IBOP and Re -Test (Good) - AOGCC Inspector John Crisp Witnessed the Test 00:00 12:00 12.00 16,784 16,784 INTRMI DRILL PULD P UD 5" DP f/ the Derrick (136 Stands - 176 Total) SIMOPS: Conduct LOT on OA w/ SLB Cement Unit, Leak Off 15.9 f�V ■01/ PPG EMW, Flush Annulus w/ 300 Bbls Fresh Water and Freeze 0 Protected w/ 70 Bbls Diesel 12:00 13:15 1.25 16,784 16,784 INTRM1 WHDBO NUND P Change Upper Rams t/ 3 X 6" Variables 1/6 13:15 14:00 0.75 16,784 16,784 INTRM1 WHDBO BOPE P Pull Wear Ring and Set Test Plug - R/U to Test BOPE Page 28 of 50 • • Time Logs Date From To Dur S. Depth E. Depth Phase Code Subcode T Comment 14:00 20:00 6.00 16,784 16,784 INTRMI WHDBO BOPE P PJSM on BOPE Test - Test BOPE w/ 4" & 4' " Test Joints as Follows; Test Annular Preventer t/ 250/2500 Psi f/ 5 Minutes - Test Upper /Lower Rams, Blind Rams, Auto /Manual (30 IBOP, HCR & Manual Choke and Kill, 4" Demco, TIW, Dart, Choke Manifold Valves 1 -16 t/ 250/3500 Psi f/ 5 Minutes, Performed Accumulator Test 30 Sec to 200 Psi Rise and 3 Minutes t/ Full Charge, Tested Manual /Hydraulic Chokes t/ 1500 Psi - Test Witnessed by AOGCC Inspector John Crisp Auto IBOP Failed Test 20:00 00:00 4.00 16,784 16,784 INTRMI RIGMNT RGRP T Replace Auto IBOP and Test t/ 250/3500 Psi f/ 5 Minutes (Good) 10/14/2010 Complete IBOP Change - P/U BHA #8 (Clean Out) and RIH t/ 6,867' MD - Establish Circulation & Test Casing Above HES Cementer t/ 1000 Psi f/ 10 Minutes - Tag HES Cementer @ 7,086' MD and Mill Out - Test Casing t/ 3500 Psi f/ 10 Minutes - POOH on TT & UD BHA #8 - P/U BHA #9 (5200 Geo- Pilot) - RIH t/ 4,195' MD (40 Stands 00:00 01:00 1.00 0 0 INTRM1 RIGMNT RGRP T Continue to M/U IBOP Safety Clamps, Guards and Bell Guide 01:00 01:45 0.75 0 0 INTRM1 DRILL OTHR P Clean / Clear the Rig Floor - P/U Geo -Span - Change Elevators - P/U BHA #8 Tools 01:45 02:30 0.75 0 0 INTRM1 DRILL PULD P P/U 7 Stds of 4" XT -39 Drill Pipe and Stand Back 02:30 10:00 7.50 0 6,867 INTRMI DRILL PULD P M/U BHA #8 and Single In Hole t/ 6,867' MD 10:00 10:30 0.50 6,867 6,867 INTRMI DRILL CIRC P Break Circulation @ 6 BPM w/ 1340 Psi - R/U to Run f/ the Derrick 10:30 11:00 0.50 6,867 6,867 INTRM1 DRILL PRTS P pressnie Test Casing Above HES. Stage Collar t/ 1000 Psi f/ 10 Minutes - Blow Down Kill Line 11:00 12:15 1.25 6,867 7,440 INTRMI CEMEN" DRLG P Wash Down & tag HES Cementer @ 7,086' MD - drill Cementer and Wash t/ 7,152' MD - RIH t/ 7,440' MD 12:15 13:15 1.00 7,440 7,440 INTRMI DRILL PRTS P R/U and Test Casing t/ 3500 Psi f/ 10 Minutes 13:15 16:30 3.25 7,440 285 INTRMI DRILL TRIP P POOH on Elevators t/ 285' MD 16:30 17:00 0.50 285 0 INTRMI DRILL PULD P UD BHA #8 17:00 20:15 3.25 0 383 INTRM1 DRILL PULD P P/U BHA #9 (GeoPilot), Upload MWD - Shallow Pulse Test 200 GPM w/ 660 Psi - Break In Geo -Pilot Bearings - Take On Oil-Based Mud 20:15 00:00 3.75 383 4,195 INTRM1 DRILL TRIP P RIH w/ BHA #9 on 4" DP Singles Filling Pipe Every 20 Stands t/ 4,195' MD (40 Stands) 10/15/2010 RIH t/ 9,175' MD - Work Through Junk In Hole - RIH t/ 16,512' MD - Circ and Condition Mud for Casing Test - Test Casing t/ 3500 Psi f/ 30 Minutes - Wash /Ream t/ Top of Baffle Collar @ 16,553' MD - Displace WellBore Fluids t/ 9 PPG MOBM - Drill Shoe Track 7 20' New Hole t/ 16,820' MD - Circ and Condition for FIT Page 29 of 50 • • Time Logs Date From To Dur S. Depth E. Depth Phase Code Subcode T Comment 00:00 05:00 5.00 4,195 9,175 INTRM1 DRILL TRIP P Continue to Single In Hole w/ BHA #9 t/ 9,175' MD (52 Stands - 92 Total) 05:00 06:00 1.00 9,175 9,175 INTRM1 DRILL WASH T Tagged Obstruction Set 25 -30K Down - Attempted to Work Through w/ Pumps and No Rotation (Unable) - Wash Ream Through Obstruction @ 200 GPM w/ 1480 Psi and 40 RPM 06:00 12:15 6.25 9,175 16,512 INTRM1 DRILL TRIP P Continue to Single In Hole w/ BHA #9 t/ 14,505' MD, then RIH f/ the Derrick t/ 16,512' MD 12:15 12:45 0.50 16,512 16,512 INTRM1 DRILL CIRC P Circulate and Condition Mud for Casing Test @ 200 GPM w/ 2900 Psi and 50 RPM 12:45 14:00 1.25 16,512 16,512 INTRM1 DRILL PRTS P Pressure Test Casing t/ 3500 Psi f/ ., 3Q Minutes 14:00 15:15 1.25 16,512 16,553 INTRM1 DRILL WASH P Wash & Ream to Top of Baffle Collar @ 16,553' MD (DPM) - Rotate on Baffle Collar and Check Geo -Pilot Vibration - 200 GPM @ 2950 Psi w/ 60 RPM 15:15 17:30 2.25 16,553 16,553 INTRMI DRILL CIRC P Displaced Wellbore Fluids f/ 12 PPG LSND to 9 PPG MOBM 17:30 19:00 1.50 16,553 16,553 INTRMI RIGMN1SLPC P Slip & Cut 60' of Drill Line 19:00 22:45 3.75 16,553 16,800 INTRM1 CEMEN" DRLG P Drill Baffle w/ 5K WOB and 60 -70 RPM - Drilled Cement to Float Collar w/ 8K WOB and 60 RPM - Ilrillert Float Collar w/ 7K WOB and 70 RPM - Drilled Cement t/ Float Shoe w/ 8K WOB & 60 RPM - Drilled Float Shoe w/ 4 -8K WOB and 50 -60 RPM - Drilled Cement t/ 16,800' MD w/ 8K WOB and 60 RPM 22:45 23:30 0.75 16,800 16,820 INTRM1 DRILL DDRL P Drill 20' New Formation for FIT t/ 16,820' MD ADT .47 P/U 250, S/O 150, Rot 190 Torque On /Off 15/12 WOB 9 / RPM 60 270 GPM @ 3250 Psi 23:30 00:00 0.50 16,820 16,820 INTRMI DRILL CIRC P Circ and Condition Mud for FIT 280 GPM @ 3250 Psi 10/16/2010 Continue to Circulate and Condition Mud Prior to FIT - Perform FIT t/ 12.5 PPG EMW - Drill 6 %" Hole f/ 16,820' to 18,430' MD MOBM Lost to Formation 34 Bbls 00:00 00:45 0.75 16,820 16,820 INTRM1 DRILL CIRC P Continue to Circ and Condition Mud Prior to FIT 00:45 01:45 1.00 16,820 16,820 INTRM1 DRILL FIT P OWFF (Static) - R/U and Perform FIT fr ,t/ 12.5 PPG EMW Page 30 of 50 • Time Logs Date From To Dur S. Depth E. Depth Phase Code Subcode T Comment 01:45 06:00 4.25 16,820 17,136 PROD1 DRILL DDRL P Drill 6 3/4' Hole t/ 17,136' MD ADT 2.83 P/U 270, S/O 138, Rot 150 WOB 16 RPM 130 Torque On /Off 14/14 270 GPM @ 3150 Psi - ECD 9.96 06:00 12:00 6.00 17,136 17,561 PROD1 DRILL DDRL P Drill 6 %" Hole t/ 17,561' MD - 160 Bbl Dilution @ 17,300' MD ADT 4.14 P/U 275, S/O 135, Rot 196 WOB 18 RPM 130 Torque On /Off 15.5/15 270 GPM © 3250 Psi - ECD 10.12 12:00 18:00 6.00 17,561 18,081 PROD1 DRILL DDRL P Drill 6 3/4' Hole t/ 18,081' MD ADT 4.43 P/U 275, S/O 135, Rot 190 WOB 16 RPM 130 Torque On /Off 16/15 270 GPM @ 3310 Psi - ECD 10.15 18:00 21:30 3.50 18,430 18,324 PROD1 DRILL DDRL P Drill 6 3/4" Hole t/ 18,324' MD - Losses 4 -8 BPH ADT 2.36 ✓ P/U 275, S/O 140, Rot 190 WOB 15 RPM 140 Torque On /Off 15/14 270 GPM @ 3350 Psi - ECD 10.19 21:30 21:45 0.25 18,324 18,324 PROD1 DRILL OWFF P OWFF (Well Flowing) - Losses 4 -8 BPH, Flow Observed Decreasing Over 15 Minute Period 21:45 00:00 2.25 18,324 18,430 PROD1 DRILL DDRL P Drill 6 %" Hole t/ 18,430' MD ADT 1.01 P/U 275, S/O 140, Rot 190 WOB 15 RPM 140 Torque On /Off 14.5/14 270 GPM @ 3330 Psi - ECD 10.16 10/17/2010 Drill 6 3/4' Hole f/ 18,430' to 20,057' MD Lost 89 Bbls of MOBM to Formation - Total 123 Bbls for Hole Section 00:00 06:00 6.00 18,430 18,936 PROD1 DRILL DDRL P Drill 6 %" Hole t/ 18,936' MD ADT 3.92 P/U 275, S/O 130, Rot 195 WOB 16 RPM 130 270 GPM @ 3340 Psi / ECD 10.19 Torque On /Off 16.5/16 Page 31 of 50 • Time Logs Date From To Dur S. Depth E. Depth Phase Code Subcode T Comment 06:00 12:00 6.00 18,936 19,278 PROD1 DRILL DDRL P Drill 6 %" Hole t/ 19,278' MD ADT 4.4 P/U 280, S/O 120, Rot 191 WOB 15 RPM 130 270 GPM @ 3330Psi / ECD 10.11 Torque On /Off 17/17 12:00 18:00 6.00 19,278 19,709 PROD1 DRILL DDRL P Drill 6 3/4" Hole t/ 19,709' MD ADT 4.17 P/U 260, S/O 130, Rot 190 WOB 15 RPM 130 270 GPM @ 3420 Psi / ECD 10.21 Torque On /Off 15.5/14.5 18:00 00:00 6.00 19,709 20,057 PROD1 DRILL DDRL P Drill 6 3/4' Hole t/ 20,057' MD ADT 3.52 P/U 260, S/O 137, Rot 189 WOB 15 RPM 130 270 GPM @ 3460 Psi / ECD 10.24 Torque On /Off 15/13.5 10/18/2010 Drill 6 3/4' Hole f/ 20,057' to 21,168' MD (TD) - CBU X3 While Standing Back 1 Stand Every 30 Minutes t/ 20,615 MD Lost 74 Bbls of MOBM to Formation - Total 197 Bbls for Hole Section 00:00 06:00 6.00 20,057 20,423 PROD1 DRILL DDRL P Drill 6 3/4" Hole U 20,423' MD ADT 4.82 P/U 260, 5/0 138, Rot 195 270 GPM @ 3440 Psi / ECD 10.13 Torque On /Off 15/13.5 RPM 130 WOB 15 06:00 12:00 6.00 20,423 20,807 PROD1 DRILL DDRL P Drill 6 3/4" Hole t/ 20,807' MD ADT 4.26 P/U 260, S/O 135, Rot 190 270 GPM @ 3570 Psi / ECD 10.34 Torque On /Off 15.5/13 RPM 130 WOB 18 12:00 18:00 6.00 20,807 21,092 PROD1 DRILL DDRL P Drill 6 3/4' Hole t/ 21,092' MD ADT 4.39 P/U 260, S/0 128, Rot 190 270 GPM @ 3590 Psi / ECD 10.36 Torque On /Off 15/13.5 RPM 130 WOB 18 Page 32 of 50 Time Logs Date From To Dur S. Depth E. Depth Phase Code Subcode T Comment 18:00 19:00 1.00 21,092 21,168 PROD1 DRILL DDRL P ,Drill 6 %" Hole t/ 21,168' MD (TD) ADT.84 - 1 Y P/U 260, S/O 128, Rot 190 270 GPM @ 3620 Psi / ECD 10.32 u�� Torque On /Off 15/13.5 RPM 130 WOB 16 19:00 00:00 5.00 21,168 20,615 PROD1 DRILL CIRC P Stand Back One Stand Every 30 Minutes While CBU X3 @ 270 GPM w/ 3500 Psi & 110 RPM - Midnight Depth 20,615 MD 10/19/2010 Finish back reaming out of the hole to 16703'. Monitor well- flowing. Rate initial) 2.35 bph and stabilized at 1.78 bph. Circulate and increase MW to 9.2 ppg. Perform 'Exhale Test'. Rate dropped to .25 bph. Pump out of the hole at 200 gpm. f/ 16,703' to 13,171' 00:00 01:15 1.25 20,615 20,233 PROD1 DRILL CIRC P Conitinue to CBU X3 Standing Back 1 Stand Every 30 Minutes t/ 20,233' MD -270 GPM @ 3450 Psi w/ 110 RPM 01:15 08:30 7.25 20,233 16,703 PROD1 DRILL REAM P BROOH from 20233' to 16703' at 110 rpm, 270 gpm at 3450 psi. Dropped rabbit on stand #176 08:30 10:00 1.50 16,703 16,703 PROD1 DRILL OWFF P Blow down top drive and monitor well. Well flowing. Monitored rate- - Initial rate = 2.35 bph. Rate stabilized at 1.78 bph. 10:00 13:00 3.00 16,703 16,703 PROD1 DRILL CIRC P Circulate and weight up mud to 9.2 ppg. No gas on bottoms up. Monitor well -still flowing 13:00 16:15 3.25 16,703 16,703 PROD1 DRILL OWFF P Rig up and perform "Exhale Test ". ✓ Shut well in and monitored pressures. Casing pressure = 18 psi, Drill pipe pressure = 34 psi. Opened well and monitored rate. Decreased to .25 bph. Shut in and monitored pressures. Stabilized at 0 psi DP and 10 psi CP. Bled off pressure and opened rams 16:15 17:15 1.00 16,703 16,703 PROD1 DRILL OWFF P Monitored well - slight flow, >25 bph. 17:15 00:00 6.75 16,703 13,171 PROD1 DRILL TRIP P Pump out of the hole at 2 bpm, and 600 psi from 16703' to 13,171' 10/20/2010 POOH w/ pump to 12,406' ( improper hole fill) monitor well flowing - RIH to 16,703' Circ btms up (no gas) monitor well - raise mud wt. to 9.6 ppg - Monitor well (well static in 40 mins) POOH w/ pump @ 3 bbls /min @ 800 psi f/ 16,703' to 10,304' 00:00 01:15 1.25 13,171 12,406 PROD1 DRILL TRIP P POOH w/ pump f/ 13,171' to 12,406' @ 2 bbls /min @ 510 psi ( improper hole fill) 01:15 02:00 0.75 12,406 12,406 PROD1 DRILL OWFF T Flow ck - well flowing - decreasing very slowly 02:00 04:30 2.50 12,406 16,703 PROD1 DRILL TRIP T PJSM - Blow down TD - RIH f/ 12,406' to 16,703' (filling pipe every 20 stds) 04:30 06:15 1.75 16,703 16,703 PROD1 DRILL CIRC T Circ btms up @ 6 bbls /min @ 2950 psi w/ 80 rpm's - No gas @ btms up Page 33 of 50 • • Time Logs Date From To Dur S. Depth E. Depth Phase Code Subcode T Comment 06:15 07:45 1.50 16,703 16,703 PROD1 DRILL OWFF T Blow down TD - Monitor well flow decreased to 0.33 bbls /hr after 90 mins. 07:45 10 :15 2.50 16,703 16,703 PROD1 DRILL CIRC T Circ & raise mud wt. to 9.6 ppg @ 6 bbls /min @ 3140 psi w/ 80 rpm's 10:15 12:00 1.75 16,703 16,703 PROD1 DRILL OWFF T Blow down top drive and observe well. Initial flow of 5 bbls /hr decreasing to .06 bbls /hr in 40 minute - well static - continue to monitor well - well remained static 12:00 00:00 12.00 16,703 10,304 PROD1 DRILL TRIP P POOH w/ pump f/ 16,703' to 10,304' _@ 3 bbls /min @ 800 psi 10/21/2010 POOH w/ pump f/ 10,304' to 8013' - Monitor well (static) attempt to pull on TT (swabbing) Cont. POOH w/ pump f/ 8013' to 6581' - Monitor well (static) attempt to pull on TT(swabbing) Cont. to POOH w/ pump to 4672' - monitor well (static) POOH on TT f/ 4672' to 385'. Lay down BHA. Pull wearring and set test plug. Test upper Pipe Rams to 250/3500 psi. Pull test plug and set wear ring. Rig up casing equipment. Pick up 4 -1/2" liner, perforated pups, swell packer and (liner hanger. Wait for PAL -Mix to set. 00:00 02:30 2.50 10,304 8,013 PROD1 DRILL TRIP P POOH w/ pump @ 3 bbls /min @ 510 psi f/ 10,304' to 8013' 02:30 03:00 0.50 8,013 8,013 PROD1 DRILL OWFF P Blow down TD - Monitor well (static) - Attempt to pull on TT - swabbing 03:00 04:45 1.75 8,013 6,581 PROD1 DRILL TRIP P POOH w/ pump @ 3 bbls /min @ 720 psi - f/ 8013' to 6581' 04:45 05:00 0.25 6,581 6,581 PROD1 DRILL OWFF P Monitor well (static) Attempt of pull on TT - swabbing 05:00 07:45 2.75 6,581 4,672 PROD1 DRILL TRIP P POOH w/ pump @ 3 bbls /min @ 650 psi f/ 6581' to 4672' 07:45 12:00 4.25 4,672 2,096 PROD1 DRILL TRIP P Monitor well -- static. Blow down top drive and pullout of the hole on elevators from 4672' to 2096' 12:00 13:15 1.25 2,096 385 PROD1 DRILL TRIP P Continue pulling out of the hole from 2096' to 385'. 13:15 14:30 1.25 385 0 PROD1 DRILL PULD P LD BHA (functioned tested blind rams as per weekly requirement while LD BHA) Download MDW in pipe shed 14:30 14:45 0.25 0 0 PROD1 WHDBO BOPE P Clear floor and drain stack. Pick up 4" test joint and pull wear ring 14:45 15:15 0.50 0 0 PROD1 WHDBO BOPE P Rig up BOPE test equipment 15:15 15:45 0.50 0 0 PROD1 WHDBO BOPE P Test upper pipe rams to 250 psi (low) goP and 3500 psi (high) as raquirari by AOGCC after use of ram for exhale test - Function test Hydril & lower pipe rams as per weekly requirement 15:45 16:15 0.50 0 0 PROD1 WHDBO BOPE P Drain stack and rig down test equipment. Set wear ring 16:15 17:15 1.00 0 0 COMPZ DRILL RURD P Clear floor and rig up casing equipment 17:15 23:15 6.00 0 4,530 COMPZ CASING RUNL P Make up 103 joints of 4 -1/2" 12.6 # L -80 IBT w/ torque rings (jts.79 - 103) - 11 perforated pups and 1- swell packer Page 34 of 50 • • Time Logs Date From To Dur S. Depth E. Depth Phase Code Subcode T Comment 23:15 00:00 0.75 4,530 4,583 COMPZ CASING PULD P Make up Baker Anchor latching assemby - Baker flex lock liner hanger assembly w/ ZXP liner top packer w/ SBE and Mix & spot Pal Mix into top of liner hanger assembly - Wait on Pal mix to set Total liner length - 4583.86' 10/22/2010 RIH w/ 4 1/2" 12.6# L -80 IBT -Mod blank liner w/ 11 pert pups & Baker Flex lock hanger w/ ZXP liner top packer on 4" DP - Obtaining T &D data - Circ DP volume @ top of 7 5/8" csg - Tagged btm @ 21,168' - Pick up to setting depth 21,160' w/ top @ 16,576' - Circ btms up - Drop & pumped down setting ball - Set liner hanger & release f/ liner - set liner top packer - PU to clear running tool f/ liner to 16,420' - Cut & slip drill line - POOH w/ pump f/ 14,420' to 14,222' 00:00 00:15 0.25 4,583 4,583 COMPZ CASING RUNL P Finish on PAL mix to set up 00:15 09:30 9.25 4,583 16,710 COMPZ CASING RUNL P RIH w/ 4 1/2" liner on 4" DP f/ 4583' to 16,710' ( fill pipe every 20 stds & obtain T &D data) 09:30 10:15 0.75 16,710 16,710 COMPZ CASING CIRC P Circ DP volume @ 4 bbls /min @ 830 psi - PU wt 245 SO wt 140 10:15 14:00 3.75 16,710 21,168 COMPZ CASING RUNL P Cont. RIH w/ 4 1/2' liner on 4" DP f/ 16,710' to 21,168' (tagged btm) 14:00 14:15 0.25 21,168 21,160 COMPZ CASING RUNL P Pull up to 21,160' (14') PU wt 290 SO wt 125 14:15 16:30 2.25 21,160 21,160 COMPZ CASING CIRC P Establish ciculation - Circ btms - up @ 5 bbls /min @ 1640 psi - Mud wt. in & out 9.6 ppg 16:30 18:15 1.75 16,576 16,576 COMPZ CASING CIRC P PJSM - Drop liner setting ball - pump ball down @ 4 bbls /min @ 1160 psi - ball on seat @ 1318 stks - Pressure up to 4200 psi tos- • -••- - release running tool f/ liner - PU to clear dogs from liner - set back down & set ZXP liner top packer - Liner shoe @ 21,160.36' - Top of liner (cD 16.576.5' - Swell! packer CO 17 18:15 18:45 0.50 16,576 16,576 COMPZ CASING PRTS P PJSM - Pressure test liner top packer to 2000 psi for 10 mins. - RD & blow down lines 18:45 19:15 0.50 16,576 16,420 COMPZ DRILL TRIP P POOH w/ DP & liner running tool w/ pump f/ 16,576' to 16,420' @ 3 bbls /min @ 610 psi - PU wt 260 So wt. 140 - Flow ck - well static 19:15 21:00 1.75 16,420 16,420 COMPZ RIGMNT SLPC P PJSM - Cut & slip drill line 60' - Service TD - Monitoring well on TT 21:00 00:00 3.00 16,420 14,222 COMPZ DRILL TRIP P Cont. POOH w/ pump f/ 16,420' to 14,222' @ 2 bbls /min @ 430 psi 10/23/2010 POOH w/ DP & liner running tool - LD running tool - MU Whipstock assembly w/ MWD tools - RIH w/ WS assembly on 4" DP to 3118' 00:00 01:00 1.00 14,222 13,554 COMPZ CASING TRIP P Continue pumping out of the hole from 14222' to 13554'. Pump at 3 bpm at 610 psi 01:00 01:15 0.25 13,554 13,554 COMPZ CASING OWFF P Monitor well - static. Attempt to POOH w/o pumping - swabbing Page 35 of 50 • • Time Logs Date From To Dur S. Depth E. Depth Phase Code Subcode T Comment 01:15 03:45 2.50 13,554 11,549 COMPZ CASING TRIP P Continue pumping out of the hole from 13554' to 11549'. Pump at 3 bpm at 500 psi 03:45 04:00 0.25 11,549 11,549 COMPZ CASING TRIP P Monitor well - static. Attempt to POOH w/o pumping - swabbing 04:00 08:15 4.25 11,549 7,825 COMPZ CASING TRIP P Continue pumping out of the hole from 11549' to 7825'. Pump at 3 bpm at 480 psi 08:15 12:00 3.75 7,825 5,343 COMPZ CASING TRIP P Monitor well - static. Blow down top drive and POOH on elevators from 7825' to 5343' 12:00 14:30 2.50 5,343 60 COMPZ CASING TRIP P POOH on elevators from 5343' to 60 14:30 15:15 0.75 60 0 COMPZ CASING PULD P Lay down Baker liner running tool and clear floor 15:15 16:00 0.75 0 0 COMPZ DRILL PULD P Clear rig floor and bring tools to the rig floor 16:00 20:15 4.25 0 257 PROD2 WHPST PULD P Pre -job safety meeting and pick up whipstock and milling assembly. 20:15 21:30 1.25 257 450 PROD2 WHPST PULD P Upload MWD - RIH f/ 257' to 450' - Pulse test MWD - 250 gpm © 420 psi - Blow down TD 21:30 00:00 2.50 450 3,118 PROD2 WHPST TRIP P RIH w/ whipstock assmebly f/ 450' to _3118' - PU wt. 110 SO wt 105 10/24/2010 RIH w/ WS assmebly f/ 3118' to 16,520' - Ran MADD pass w/ GR f/ 16,520' to 16,572' to confirm depth of Alpine C sand & orient WS to 9° L of high side - Set down 5 k @ 16,576' (liner top) - Set btm trip anchor w/ 12 k - Survey to confirm oriention of WS @ 9° L - Set down 50 k to shear starting mill (no surface indication shear) repeat process 3 times - Rotate string to confirm shear - Mill window f/ 16,428' to 16,449' - Drilled formation f/ 16,449' to 16,478' w/ millinQassembly 00:00 09:30 9.50 3,118 16,520 PROD2 WHPST TRIP P RIH w/ WS assembly from 3118' to 16520' (filling pipe every 20 stds) 09:30 10:15 0.75 16,520 16,572 PROD2 WHPST WPST P Make MAD pass with GR from 16520' to 16572'. Orient whipstock to 9 deg. left of high side COL( 10:15 10:30 0.25 16,572 16,576 PROD2 WHPST WPST P RIH f/ 16572' - Tagged liner top at 16,576' w/ 5 k - slack -off to 12 k to set btm trip anchor - P/U to 275k (15k over) to check setting of anchor 10:30 10:45 0.25 16,576 16,576 PROD2 WHPST WPST P Pump up survey to confirm whipstock orientation @ 9° L of high side 10:45 11:45 1.00 16,576 16,576 PROD2 WHPST WPST P Set 50K on whipstock. P/U to 260k and set 50k on whipstock. P/U to 275k, S/O 75k on whipstock. P/U to 175k and S/O 75k on whipstock to shear bolt - Saw no surface indication of bolt shearing 11:45 12:00 0.25 16,576 16,576 PROD2 WHPST WPST P Rotate at 10 rpm and 10k ft -Ibs torque and S/O to 200k to verify bolt sheared 12:00 17:00 5.00 16,428 16,449 PROD2 WHPST WPST P Mill winrinw frnm 16498' to 1R44A' (7486' TVD) at 325 gpm, 3750 psi, 80 rpm, 13k ft -Ibs torque 17:00 00:00 7.00 16,449 16 PROD2 WHPST WPST P Drilled formation w/ milling assembly f/ 16,449' to 16,478' MD 7489' TVD WOB - 25 k RPM 80 GPM 325 @ 3630 psi Page 36 of 50 • Time Logs Date From To Dur S. Depth E. Depth Phase Code Subcode T Comment 10/25/2010 24 hr Summary Ream through window w/ milling assembly (window appears to be in good condition) ran milling assembly through window w/ no rotary (no problem) Circ super sweep out of hole - RU & attempt FIT - went to leak -off @ 11.55 ppg EMW - RD - Monitor well (slight flow static in 60 mins) POOH w/ Milling assembly - Down MWD - LD Milling BHA - Pull wear bushing & set junk catcher wear bushing - PU stack washer & Prep to flush BOP stack 00:00 01:15 1.25 16,478 16,397 PROD2 WHPST CIRC P Circ super sweep pill out of hole - Ream thru window f/ 16,428' to 16478' - 325 gpm @ 3600 psi - 80 rpm's w/ 13 k torque - Slide thru window w/ no ratation OK - pull up & std back 1 std DP to 14,397' 01:15 02:45 1.50 16,397 16,397 PROD2 WHPST LOT P PJSM - Blow down TD - RU for FIT /LOT - Made 3 attempts - #1 pumped 50 stks(5 bbls) pressure build rare very slow - shut down - Check & change out sensor - # 2 pumped 36 stks(3.6 bbls) 480 psi - shut down - Changed to pump #2 - #3 - Pumped 104 stks(10.4 bbls) pressure build up slow & appeared to be pumping away @ 760 psi - 11.55 ppg EMW 02:45 04:00 1.25 16,397 16,397 PROD2 WHPST OWFF P PU single of DP f/ pipe shed - Monitor well - slight flow - well went static in 60 mins. 04:00 12:00 8.00 16,397 10,030 PROD2 WHPST TRIP P Attempt to pull on elevators (swabbing) POOH w/ milling assembly w/ pump f/ 16397' to 10,030' @ 3 bbls /min @ 680 psi - PU wt 240 SO wt 150 - hole taking proper fill 12:00 12:15 0.25 10,030 10,030 PROD2 WHPST OWFF P Monitor well - slight flow 12:15 14:15 2.00 10,030 7,835 PROD2 WHPST TRIP P Cont. to POOH w/ pump f/ 10030' to 7835' @ 3 bbls /min @ 500 psi - PU wt170 SO wt 130 14:15 14:30 0.25 7,835 7,835 PROD2 WHPST OWFF P Monitor well - static 14:30 19:30 5.00 7,835 110 PROD2 WHPST TRIP P POOH on TT f/ 7835' to 110' - Flow ck - well static 19:30 21:00 1.50 110 110 PROD2 WHPST PULD P Change elevator to 3 1/2' - Plug into MWD & down load 21:00 23:00 2.00 110 0 PROD2 WHPST PULD P LD milling assmebly - top string mill was full gage (6 3/4') - Clear rig floor of Baker milling tools 23:00 00:00 1.00 0 0 PROD2 WHDBO OTHR P PU test jt - Pull wear bushing - Set junk catcher wear bushing - MU stack washer - Prep to flush BOP stack 10/26/2010 Flush BOP stack - Change out TD saver sub - RU & test BOPE - Flush Choke manifold & gas buster - MU BHA # 11 (6 3/4' Geo -Pilot w/ ADR) - RIH to 15,666' ( filling pipe every 20 stds & ck. MWD) 00:00 01:00 1.00 0 0 PROD2 WHDBO OTHR P Flush stack @ 15 rpm and 7 bpm and function test rams. 01:00 03:00 2.00 0 0 PROD2 RIGMNT SVRG P Change saver sub and dies in grabber. 03:00 04:00 1.00 0 0 PROD2 WHDBO RURD P Drain stack and install test plug Page 37 of 50 • . Time Logs Date From To Dur S. Depth E. Depth Phase Code Subcode T Comment 04:00 10:00 6.00 0 0 PROD2 WHDBO BOPE P Rig up and test BOPE with 4 ", 4 -1/2" , & 3 1/2" test jts. Test annular to 250/2500 psi. Test all other components to 250/3500 psi. 80P Perform accumulator test. Chuck Scheve, AOGCC, waived witnessing the BOPE test 10:00 11:15 1.25 0 0 PROD2 WHDBO OTHR P Drain stack. Blow down lines. Install test plug. Verify chokes functioning and poor -boy gas buster clear. 11:15 12:00 0.75 0 0 PROD2 WHDBO OTHR P Set wear ring 12:00 13:45 1.75 0 106 PROD2 DRILL PULD P Make up rotary steerable BHA 13:45 14:30 0.75 106 106 PROD2 DRILL PULD P Upload MWD 14:30 15:00 0.50 106 210 PROD2 DRILL PULD P Continue making rotary steerable BHA 15:00 15:30 0.50 210 397 PROD2 DRILL TRIP P Make up two stand of HWD w/ Bumper Sub 15:30 16:00 0.50 397 397 PROD2 DRILL DHEQ P Shallow test MWD at 200 gpm, 900 psi, Blow down top drive 16:00 00:00 8.00 397 15,666 PROD2 DRILL TRIP P Run in hole with stand out of derrick from 396' to 15666'. Fill drill pipe every 20 stands 10/27/2010 RIH to 16,335' - Cut & slip drill line - Wash down f/ 16,335' to 16,461' (had to work GP cutters thru window) Unable to rotate - Pulled back thru window to 16,426' - Establish rotation - Wash back down to 16,456' w/ No ratation - Establish rotation - Ream f/ 16,456' to 16,478' - Drilled 6 3/4' hole w/ GP f/ 16,478' to 17,288' 00:00 00:45 0.75 15,666 16,335 PROD2 DRILL TRIP P RIH f/ 15,666' to 16,335' - Ck MWD tools - PUwt240 SOwt140 - Blow down TD 00:45 02:15 1.50 16,335 16,335 PROD2 RIGMNT SLPC P PJSM - Cut & slip drill (line (75') calibrate block height - Service TD 02:15 03:30 1.25 16,335 16,461 PROD2 DRILL WASH P Wash down f/ 16,335' to 16,461' @ 250 gpm @ 3030 psi - PU wt 240 SOwt145- Took wt@ 16,554' (Geo -Pilot cutters @ btm of window) worked thru window took 24 k to get thru window w/ cutters 03:30 05:30 2.00 16,461 16,478 PROD2 DRILL WASH P Attempt to rotate @ 16,461' - Stalling rotary - Added 1 tote of 776 to pit 5 & circ down to bit - Attempt to rotate @ 16,461' (no go) Pulled up to 16,457' - attempt to rotate (no go) Pulled back to 16,426' (drilling assembly above top of window) Observed 25 k over pulling GP cutters back thru window - Attempt to rotate - 60 rpm @ 12 k torque - pumping 250 gpm @ 3120 psi - ROT wt. 185 - Wash down f/ 16426' to 16,456' (observed same wt. 24 K to get GP cutters thru window) Attempt to rotate - 60 rpm @ 12 k torque - 250 gpm @ 3030 psi - wash & ream f/ 16,461' to 16,478' Page 38 of 50 II • Time Logs Date From To Dur S. Depth E. Depth Phase Code Subcode T Comment 05:30 12:00 6.50 16,478 16,653 PROD2 DRILL DDRL P Drilled 6 3/4" hole w/ GP f/ 16,478' to 16653' MD - 7500' TVD ADT 4.88 hrs ECD9.96 ppg Footage 175' WOB 10/15 k RPM 110 GPM 260 @ 3300 psi String wt PU 240 SO 152 ROT 190 Torque on /off btm.- 12,000/10.500 ft/Ibs 12:00 00:00 12.00 16,653 17,288 PROD2 DRILL DDRL P Drilled 6 -3/4" hole w/ GP f/ 16653' to 17.288' MD 7492' TVD ADT 7.14 hrs ECD 10.04 ppg Footage 635' WOB 10/15 k RPM 110 GPM 270 @ 3340 psi String wt PU 235 SO 150 ROT 190 Torque on /off btm.- 13,000/10.500 ft/Ibs 10/28/2010 Drilled 6 3/4" hole w/ GP f/ 17,288' to 18,815' 00:00 12:00 12.00 17,288 17,972 PROD2 DRILL DDRL P Drilled 6 3/4" hole w/ GP f/ 17,288' to 17972' MD 7479' TVD ADT - 7.03 hrs. ECD - 10.04 ppg Footage 684' WOB 10/15k RPM 120 GPM 280 @ 3430 PSI String wt - PU 245 SO 145 ROT 190 Torque on /off btm.- 13.5/12 k ft/Ibs Note: Crossed possible fault @ 17,710' - Hole taking 10/12 bbls /hr slight flow on connections 12:00 00:00 12.00 17,972 18,815 PROD2 DRILL DDRL P Drilled 6 3/4" hole w/ GP f/ 17,972' to 18,815' MD 7479' TVD ADT- 8.14 hrs ECD- 10.27 ppg Footage - 843' WOB- 5/10 k RPM 120 GPM 270 @ 3460 psi String wt - PU 240 SO 145 ROT 190 Torque on /off btm.- 14/12 k ft/Ibs Note: Hole taking 10/12 bbls /hr slight flow on connections 10/29/2010 Drilled 6 -3/4" hole w/ GP from 18815' to 20,270' Page 39 of 50 • Time Logs Date From To Dur S. Depth E. Depth Phase Code Subcode T Comment 00:00 12:00 12.00 18,815 19,578 PROD2 DRILL DDRL P Drilled 6 3/4" hole w/ GP f/ 18815' to 19578' MD - 7485' TVD ADT- 7.87 hrs ECD- 10.20 ppg Footage- 764' WOB 10/15 k RPM 120 GPM 270 @ 3560 psi String wt. P/U = 250, S/O = 140, Rot = 190, Torque on = 14.5 kft-Ibs, Torque off = 13.5 kft-Ibs Well still breathing on connections 12:00 00:00 12.00 19,578 20,270 PROD2 DRILL DDRL P Drilled 6 3/4" hole w/ GP f/ 19,578' to 20,270' MD 7467' TVD ADT- 7.33 hrs ECD- 10.36 ppg Footage- 682' WOB 10/19 k RPM 120 GPM 270 @ 3680 psi String wt - PU 255 SO 135 ROT 190 Torque on /off btm.- 17.5/14.5 k ft/Ibs Well still breathing on connections Total losses to formation - 211 bbls 9.0 ppg MOBM 10/30/2010 Drilled 6 3/4" hole w/ GP f/ 20,270' to 20,725' (TD of section) - Circ 3 X btms up & back ream f/ 20,342' - Changed out swivel packing - Cont. BROOH f/ 20342' to 19,961' (raising mud wt. to 9.6 ppg) - Flow ck(slight flow) Cont. BROOH f/ 19,961' to 16,716' - POOH w/ no rotation f/ 16,716' to 16,335' (while pulling BHA through window) - Flow ck @ 16,335' - Static in 8 mins.- Circ btms up @ 16,335' 00:00 06:45 6.75 20,270 20,725 PROD2 DRILL DDRL P Drilled 6 3/4" hole w/ GP f/ 20,270' to 20,725' MD 7478' TVD , ADT- 5.47 hrs ECD- 10.20 ppg Footage- 455' WOB- 10/18 k RPM 120 GPM 270 @ 3610 psi String wt. PU 265 SO 115 ROT 189 Torque on /off btm.- 17/ 17 k ft/Ibs •1 06:45 09:30 2.75 20,725 20,342 PROD2 DRILL CIRC P Circ 3 X btms up @ 270 gpm @ 3560 psi w/ 110 rpm's - torque 15 k - Std back 1 std DP every 30 mins.f/ 20,725' to 20,342' ( tight spot @ 20,695') 09:30 09:45 0.25 20,342 20,342 PROD2 RIGMNT SFTY P Pre -job safety meeting on changing out swivel packing 09:45 10:30 0.75 20,342 20,342 PROD2 RIGMNT SVRG P Change swivel packing. Well static 10:30 16:00 5.50 20,342 19,961 PROD2 DRILL CIRC P Continue circulating and weight up to 9.6 ppg @ 270 gpm @ 2560 psi w/ 110 rpm's - torque 15 k - Rack back 1 std DP evey hr. f/ 20,342' to 19,961' 16:00 16:15 0.25 19,961 19,961 PROD2 DRILL OWFF P Monitor well - slight flow but decreasing to static Page 40 of 50 Time Logs Date From To Dur S. Depth E. Depth Phase Code Subcode T Comment 16:15 22:15 6.00 19,961 16,335 PROD2 DRILL REAM P Back ream out of the hole from 19,961' to 16,335' Pump at 260 rpm @ 3000 psi w/ 100 rpm's - torque 14.5 k - suht down rotary f/ 16,716' to 16,635' ( while pulling BHA back though window - Observed no over pull while coming through window) 22:15 22:30 0.25 16,335 16,335 PROD2 DRILL OWFF P Monitor well - static in 8 rains. 22:30 00:00 1.50 16,335 16,335 PROD2 DRILL CIRC P Circ btms up @ 16,335' - 250 gpm @ 3200 psi w/ 40 rpm's torque 13 k Lost 68 bbls - MOBM to hole last 24 hrs. Total losses to well - 279 bbls 10/31/2010 Monitor well @ 16335' (Static in 35 mins) POOH w/ GP BHA - to 10,126' - Repair air leak on IBOP - Cont. POOH w/ BHA - to 5736' ( had to pump out to this depth) - POOH on TT to 1823' - LD 15 Stds(45 jts) 4" DP w/ several jts having under gage tool jts 00:00 00:45 0.75 16,335 16,335 PROD2 DRILL OWFF P Monitor well. Well static in 35 minutes 00:45 10:15 9.50 16,335 10,126 PROD2 DRILL TRIP P Pump out of the hole from 16335' to 10123'. Pump at 3.5 bpm, 960 psi - Attempt to pull on elevators - swabbing 10:15 10:45 0.50 10,126 10,126 PROD2 RIGMNTSVRG P Service rig 10:45 12:00 1.25 10,126 10,126 PROD2 RIGMN7 RGRP T Repair actuator on top drive IBOP / 12:00 15:00 3.00 10,126 7,740 PROD2 DRILL TRIP P Pump out of the hole from 10126' to ✓ 7740' - 4 bbls /min @ 1000 psi 15:00 15:15 0.25 7,740 7,740 PROD2 DRILL TRIP P Flow ck well static - Attempt to POOH on elevators- swabbing 15:15 17:00 1.75 7,740 5,831 PROD2 DRILL TRIP P Pump out of the hole from 7740' to 5831' @ 4 bbls /min @ 1000 psi 17:00 17:30 0.50 5,831 5,736 PROD2 DRILL TRIP P Flow ck - well static - Attempt to pull on elevators - Pulled 1 std to 5736' - fluid level dropping - Blow down TD 17:30 21:45 4.25 5,736 1,823 PROD2 DRILL TRIP P POOH on elevators f/ 5736' to 1823' - PU wt 110 SO wt 105 21:45 23:45 2.00 1,823 397 PROD2 DRILL PULD T Prep pipe shed to LD DP - Pre -job safety meeting. Lay down 45 joints 4" DP with worn tool joints. (O.D. of some tool joints had 4- 5/16" O.D) 23:45 00:00 0.25 397 397 PROD2 DRILL OWFF P Monitor well - static Lost 20 bbls to formation last 24 hrs. Total losses to date 299 bbls - MOBM 11/01/2010 Finish laying down BHA. Download MWD. Lay down an additional 9 stands of 4" drill pipe from the derrick Make up Whipstock Retrieving BHA and pick up 4 stand 4" HWDP from pipe shed. Trip in the hole to 16, 387'. Cut and slip drilling line. Orient retrieving tool and engage whipstock. Pull whipstock free with 350k. Circulate bottoms up. Monitor well - static in 15 minutes. Pump out of the hole from 16,387' to 14,671' Page 41 of 50 • Time Logs Date From To Dur S. Depth E. Depth Phase Code Subcode T Comment 00:00 00:45 0.75 397 105 PROD2 DRILL PULD P LD 3 jts. HWDP - bumper sub - Std back jars & 2 jts HWDP - LD NM flex DC's 00:45 01:30 0.75 105 105 PROD2 DRILL PULD P Plug in & down load MWD 01:30 03:00 1.50 105 0 PROD2 DRILL PULD P LD MDW, GeoPilot & bit - 03:00 03:45 0.75 0 0 PROD2 DRILL OTHR P Clean up rig floor from oil base mud & clear BHA tools from floor 03:45 04:45 1.00 0 0 PROD2 DRILL PULD P LD 9 stds 4' DP f/ derrick several jts with under gage tool jts. 04:45 05:30 0.75 0 0 COMPZ WHPST PULD P Stage Baker tools for WS assembly to rig floor - Change DP elevators 05:30 06:45 1.25 0 82 COMPZ WHPST PULD P MU Baker whipstock retrieval BHA • 06:45 07:15 0.50 82 450 COMPZ WHPST PULD P RIH w/ Baker BHA to 450' - picking up 12 jts. 4" HWDP f/ pipe shed 07:15 15:45 8.50 450 16,387 COMPZ WHPST TRIP P RIH w/ WS retrieval assembly w/ 4" DP f/ 450' to 16387' P/U 240k, S/O 155k. 15:45 16:00 0.25 16,387 16,387 COMPZ WHPST CIRC P Break circulation and establist slow pump rates. Blow down top drive 16:00 16:15 0.25 16,387 16,387 COMPZ RIGMNT SFTY P PJSM on cutting and slipping drilling line 16:15 17:30 1.25 16,387 16,387 COMPZ RIGMNT SVRG P Cut and slip 60' of drilling line. Service top drive 17:30 18:30 1.00 16,387 16,387 COMPZ WHPST OTHR P Establish circulation and orient hook. Latch whipstock and pull free with 350k. 18:30 20:30 2.00 16,387 16,387 COMPZ WHPST CIRC P Circulate bottoms up at 5 bpm and 1710 psi. 20:30 20:45 0.25 16,387 16,387 COMPZ WHPST OWFF P Monitor well - static in 15 minutes 20:45 00:00 3.25 16,387 14,671 COMPZ WHPST TRIP P POOH w/ pump r/ 16387' to 14,671' @ 3 bbls /min @ 680 psi - PU wt w/ pumps on 250 k 11/02/2010 Continue to Pump Out of the Hole w/ the Whipstock t/ 8,272' MD - OWFF (Static) - POOH on TT t/ 450' MD - UD Whipstock and Whipstock Retrieving Hook BHA - Clean & UD Magnets - Clean / Clear the Rig Floor - P/U VACS Clean Out BHA t/ 132' MD Located Float in 4th Stand of HWDP 00:00 10:00 10.00 14,671 8,272 COMPZ WHPST TRIP P _ POOH w/ Whipstock While Pumping, t/ 8,272' MD 3 BPM w/ 480 Psi 10:00 10:30 0.50 8,272 8,081 COMPZ WHPST OWFF P OWFF (Static) - POOH t/ 8,081' MD on TT (Not Swabbing) 10:30 16:45 6.25 8,081 450 COMPZ WHPST TRIP P B/D the Top Drive and POOT w/ Whipstock on TT t/ 450' MD 16:45 20:45 4.00 450 0 COMPZ WHPST PULD P S/B 4 Stands of HWDP - UD HWDP Single -1/D Whipstock Retreival Hook, Wipstock, Anchor and Magnets - NOTE: Float Not in Float Sub 20:45 21:00 0.25 0 0 COMPZ WHPST OWFF P OWFF (Static) 21:00 22:30 1.50 0 0 COMPZ WHPST OTHR P Clean and Clear Rig Floor - UD Tools and Equipment - Clean and UD Magnets Page 42 of 50 III' Time Logs Date From To Dur S. Depth E. Depth Phase Code Subcode T Comment 22:30 00:00 1.50 0 132 COMPZ DRILL PULD P M/U Clean Out BHA as Folllows: 2 7/8" Mule Shoe, 1 Jt 2 7/8" Tubing, XO, Mill, 3 - String Magnets, VACS Reverse Circulating Tool 11/03/2010 Continue to M/U and RIH w/ VACS Circulating Tool t/ 15,697' MD (159 Stds) - Circ Through VACS Tool Cleaning Out Casing & Seal Bore Receptacle to 16,581' MD - CBU - OWFF (Breathing) - POOH w/ Pumps t/ 13,694' MD (30 Stands) - OWFF @ 13,694' MD (Static); Attempted to POOH on TT (Swabbing) - Continue to POOH w/ Pum.s t/ 11,498' MD (23 Stands - 53 Total) 00:00 01:00 1.00 132 524 COMPZ DRILL PULD P Continue to M/U VACS Reverse Circulating BHA t/ 524' MD Found Missing Float in 4" HWDP 01:00 09:45 8.75 524 15,697 COMPZ DRILL TRIP P RIH w/ BHA #13 t/ 15,697' MD (159 Stands) Filling Pipe Every 20 Stands 09:45 13:30 3.75 15,697 16,581 COMPZ DRILL CIRC P Circ Trough VACS Tool Cleaning Debris f/ Casing and SBR t/ 16,581' MD (10 Stands) 4 % BPM @ 1640 - 1750 Psi 13:30 16:00 2.50 16,581 16,581 COMPZ DRILL CIRC P CBU @ 4 % BPM w/ 1750 Psi 16:00 16:30 0.50 16,581 16,581 COMPZ DRILL OWFF P OWFF (Breathing) 16:30 00:00 7.50 16,581 11,489 COMPZ DRILL TRIP P POOH w/ Pumps t/ 13,694' MD (30 Stands) - OWFF @ 13,694' MD (Static); Atempted to POOH on TT (Swabbing) - Continue to POOH w/ Pumps t/ 11,498' MD (23 Stands - 53 Total) 3 PBM @ 780 Psi 11/04/2010 Continue to POOH w/ Pumps t/ 6,340' MD - OWFF (Static) - POOH on TT t/ 524' MD - UD Clean Out (VACS) BHA - Clean & Clear the Rig Floor and Rig Vacuum System - R/U and Run 4 %" Slotted /Blank Liner on 4" DPU5,850' MD 00:00 04:15 4.25 11,489 8,441 COMPZ DRILL TRIP P Continue to POOH w/ Pumps t/ 8,441' MD (31 Stands - 84 Total) 04:15 05:00 0.75 8,441 8,250 COMPZ CASING OWFF P OWFF (Static) - Observe Fluid Level While Pulling on TT (Fluid Dropping) - Attempt to Pull on TT t/ 8,250' MD (2 Stds - Improper Hole Fill) - OWFF (Static) 05:00 07:30 2.50 8,250 6,340 COMPZ DRILL TRIP P Continue to POOH w/ Pumps U 6,340' MD (22 Stds - 108 Total) 07:30 08:00 0.50 6,340 6,245 COMPZ DRILL OWFF P OWFF; Static in 15 Minutes - Pull 1 Stand to Check for Swabbing (Good) 08:00 12:00 4.00 6,245 524 COMPZ DRILL TRIP P POOH on TT t/ 524' MD (59 Stands - 168 Total) 12:00 14:00 2.00 524 0 COMPZ DRILL PULD P S/B 4 Stands of HWDP - UD VACS Tool, Clean Magnets, UD Remainder of BHA 14:00 15:00 1.00 0 0 COMPZ DRILL RURD P Clean & Clear the Rig Floor / Rig Vacuum System 15:00 15:30 0.50 0 0 COMPZ CASING RURD P R/U to Run Liner , 15:30 18:30 3.00 0 1,560 COMPZ CASING RUNL P P/U 4 %" Slotted /Blank Liner, Casing Swivel, and Hanger per Detail t/ 1,560' MD Page 43 of 50 • 11 11 0 Time Logs Date From To Dur S. Depth E. Depth Phase Code Subcode T Comment 18:30 19:45 1.25 1,560 1,560 COMPZ CASING DHEQ P P/U Slim Hole MWD Equipment and Orient Hook Hanger to MWD 19:45 20:45 1.00 1,560 1,560 COMPZ CASING RURD P Change Elevators t/ 4' DP and UD Liner Running Equipment 20:45 21:30 0.75 1,650 2,510 COMPZ CASING RUNL P P/U 1 Std of DP and Pulse Test MWD; Pulse Good, but MWD TF Data Unresponsive - Discussed and Decided to RIH w/ 10 Stands of DP and Re -test - RIH t/ 2,510' MD - Retest MWD (Good) 21:30 21:45 0.25 2,510 2,510 COMPZ CASING SFTY P Safety Stand Down w/ Crew: Gave Accolades for Coming Up w/ Idea to Safely Handle Magnets and for Completing a Safe Hitch - Reitereated the Need for Everyone to Bring Ideas for Efficiency /Safety Forward 21:45 00:00 2.25 2,510 5,850 COMPZ CASING RUNL P Continue to RIH t/ 5,850' MD Filling Pipe Every 20 Stands (35 Stds) - NOTE: MWD Pulses Good at 155 GPM and Above 11/05/2010 Continue to RIH w/ Liner on 4" DP t/ 17,988' MD - Attempt to Free Liner Running Tools f/ the Liner; Successful - POOH w/ Pumps t/ 12,942' MD 00:00 05:30 5.50 5,850 13,966 COMPZ CASING RUNL P Continue to RIH w/ 4 %" Slotted /Blank Liner t/ 13,966' MD Filling Pipe and Checking Pulses Every 20 Stands 05:30 06:15 0.75 13,966 13,966 COMPZ CASING DHEQ T Trouble Shoot MWD; Not Getting Tool Faces, unable to Decode Pulses - Switch f/ MP 2 to MP 1 and Problem Solved 06:15 08:00 1.75 13,966 16,352 COMPZ CASING RUNL P Continue to RIH w/ Liner on 4" DP t/ 16,352' MD - P/U 255, S/O 140 08:00 11:30 3.50 16,352 17,988 COMPZ CASING RUNL P Tag No -Go @ 16,620' MD - POOH t/ 16,352' MD and Orient Hanger to Window - RIH t/ 17,988' MD and Set Hanger on Window Twice, Set 35K Down on Hanger Hook 11:30 13:30 2.00 17,988 17,988 COMPZ CASING CIRC P Drop Ball and Pump Down W 3.5 BPM w/ 1600 Psi (Ball Not on Seat) 13:30 15:30 2.00 17,988 17,988 COMPZ CASING CIRC T Dropped 2nd Ball and Circ Down @ 3.5 BPM w/ 1080 Psi (Lost 580 Psi) Seat Appeared to Shear Early - Attempt to Pull Out of Hanger But Setting Sleeve Did Not Release 15:30 18:30 3.00 17,988 16,483 COMPZ CASING OTHR T Work Left Hand Torque Down Drill String Attempting to Release f/ the Hanger While Pumping @ 3 BPM w/ 860 Psi - Pulled Up to 265 When Attempting to Determine Whether Tool was Released or Not - Tool Appeared to Release w/ Reduced P/U Weight (230) and 120 Psi Reduction in Pumo Pressure - Liner _ S (1 Tail @ 17,988' / Hanger Top @ iw 16,435' MD 7 Page 44 of 50 • 41101 Time Logs Date From To Dur S. Depth E. Depth Phase Code Subcode T Comment 18:30 00:00 5.50 16,483 12,942 COMPZ CASING TRIP P OWFF (Static) - Pull 2 Stds t/ 16,282' MD (Swabbing) - POOH w/ Pumps t/ 14,375' MD (20 Stds) - Attempt to POOH on TT (Swabbing) - POOH w/ Pumps t/ 12,942' MD (15 Stds) 11/06/2010 Continue to POOH w/ Pumps t/ 10,577' MD - OWFF (Static) - POOH on TT t/ Surface; Observe 3 %" IF to 4" XT39 Crossover Backed Out of Running Tools - Service the Rig and Slip /Cut Drilling Line - M/U Fishing BHA and RIH t/ 16,420' MD; Obtain Torque and Drag Parameters - Attempt to Pull Liner Hanger Running Tools w/ Straight Pull (Unsuccessful) - Attempt Work Right Hand Torque Down and Pull (Unsuccessful) - Pump Shut Off Ball Down and Attempt to Release Running Tools w/ 2500 and 2800 Psi (Unsuccessful) - Applied Right hand Torque to String and Applied 2800 Psi Again, Pulled to 300K Indicated and Observed Loss of 30K - Slacked Off and Liner Hanger or Tool String Appeared to Enter Lateral - Increased Pressure to Rupture Circ Sub Disc - CBU - Observe Well Until Static 00:00 02:45 2.75 12,942 10,577 COMPZ CASING TRIP P Continue to POOH w/ Pumps t/ 10,577' MD (20 Stands) 02:45 03:15 0.50 10,577 10,461 COMPZ CASING OWFF P OWFF (Static) - Attempt to Pull 1 Stand on TT (Not Swabbing) - Line Up on TT 03:15 10:00 6.75 10,461 0 COMPZ CASING TRIP P POOH on TT - XO (4" XT 39 Box by 3 W' IF Pin) Backed Out of Hanger _Running Tool 10:00 10:30 0.50 0 0 COMPZ CASING PULD P Clean & Clear the Rig Floor 10:30 13:30 3.00 0 0 COMPZ RIGMNT SLPC P Service the Rig and Top Drive - Clut & Slip Drill Line 13:30 19:45 6.25 0 16,420 COMPZ FISH TRIP T M/U Fishing Tools: Cut Lip Thread and Circ Sub - RIH t/ 16,420' MD (172 Stds) 19:45 20:00 0.25 16,420 16,420 COMPZ FISH CIRC T Take Torque and Drag Parameters - 3 BPM w/ 750 Psi, P/U 240, S/O 147, Rot 185, Torque 11K 20:00 21:45 1.75 16,420 16,420 COMPZ FISH FISH T P/U Single and Engage Fish - Attempt to Pull Liner Hanger Running Tools w/ Straight Pull (Unsuccessful), Attempt Work Right Hand Torque Down and Pull (Unsuccessful) Pulled Up t/ 270 K Indicated to Free Tool String - Pump Shut Off Ball Down - Pressure Up t/ 2500 Psi to Hydraulically Release Tools (No -Go) - Increase Pressure t/ 2800 Psi w/ Same Result - Applied Right hand Torque to String and Applied 2800 Psi Again, Pulled to 300K Indicated and Observed Loss of 30K - Slacked Off and Liner Hanger or Tool String Appeared to Enter Lateral - Worked String Several Times w/ Same Result - Increased Pressure t/ 3500 Psi and Observe Disc in Circ Sub Rupture 21:45 23:15 1.50 16,420 16,420 COMPZ FISH CIRC T CBU @ 4 BPM w/ 1050 Psi 23:15 00:00 0.75 16,420 16,420 COMPZ FISH OWFF T Blow Down the Top Drive and Observe Well Until Static Page 45 of 50 Time Logs Date From To Dur S. Depth E. Depth Phase Code Subcode T Comment 11/07/2010 24 hr Summary POOH w/ Pumps t/ 12,028' MD - OWFF (Static) - Attempt to POOH on TT (Hole Fill Incorrect) - POOH w/ Pumps t/ 7,330' MD - POOH on TT (All Liner Running Tools Present) - UD Liner Running and Slim MWD Tools; Closing Ball and Seat Washed Out - R/U and Begin BOPE Test 00:00 05:15 5.25 16,420 12,028 COMPZ FISH TRIP T POOH w/ Pumps t/ 12,028' MD (45 Stds) 05:15 05:45 0.50 12,028 12,028 COMPZ FISH OWFF T OWFF Until Static - Blow Down Top Drive 05:45 06:15 0.50 12,028 11,550 COMPZ FISH TRIP T POOH on Elevators t/ 11,550' MD (5 Stds) - Insufficient Hole Fill 06:15 13:45 7.50 11,550 7,330 COMPZ FISH TRIP T Continue to POOH w/ Pumps t/ 7,330' MD (40 Stds) 13:45 19:30 5.75 7,330 0 COMPZ FISH TRIP T POOH on TT t/ Surface (81 Stds) - Entire Inner Tool String Present 19:30 19:45 0.25 0 0 COMPZ CASING SFTY P PJSM on UD Liner Running Tools and Slim MWD Suite 19:45 20:45 1.00 0 0 COMPZ CASING PULD P UD Liner Running /Slim MWD Tools - NOTE: Closing Ball and Seat Washed Out, Liner Shear Screws Sheared and Liner Appeared to Have "Safetied Off' 20:45 21:45 1.00 0 0 COMPZ WHDBO OTHR P Clean /Clear the Rig Floor - Drain BOP Stack and Pull the Wear Ring 21:45 22:45 1.00 0 0 COMPZ WHDBO RURD P Set BOP Test Plug and R/U to Test BOPE w/ 3 '' /z' & 4 '' /z' Test Joints 22:45 00:00 1.25 0 0 COMPZ WHDBO BOPE P Fill Stack & Choke Manifold w/ Water and Test BOPE w/ 3 %" Test /SOP Joint as Follows: Test Annular t/ °Pr 250/2500 Psi J 11/08/2010 Complete BOPE Test w/ 3 %" and 4' /z" Test Joints; AOGCC Inspector Jeff Jones Waived Witnessing the Test - R/U and Run Completion String t/ 14,377' MD - R/U CAMCO Bal -O Nipple Control Lines, Sheeves and Spools 00:00 07:30 7.50 0 0 COMPZ WHDBO BOPE P Continue to Test BOPE as Follows: Test Upper /Lower Rams, Choke Manifold Valves 1 -16, 4" DEMCO, HCR & Manual Choke /Kill - Auto/Manual IBOP - TIW & Dart Valve t/ 250/3500 Psi w/ 4 %" Test Joint - Test Blind Rams t/ 250/3500 Psi - Test Upper /Lower Rams w/ 3 '' /2 Test Joint t/ 250/3500 - Test Annular w/ 3 %" Test Joint t/ 250/2500 Psi - Perform Accumulator Test - BOPE Test Waived by AOGCC Inspector Jeff Jones 07:30 08:15 0.75 0 0 COMPZ WHDBO RURD P Drain Stack & Pull BOP Test Plug - Set Tubing Wear Ring - Blow Down Lines 08:15 09:15 1.00 0 0 COMPZ RPCOM RURD P R/U to Run Completion String 09:15 09:45 0.50 0 0 COMPZ RPCOM SFTY P PJSM on Running Completion Tubing and Jewelry Il i Page 46 of 50 • Time Logs Date From To Dur S. Depth E. Depth Phase Code Subcode T Comment 09:45 22:15 12.50 0 14,337 COMPZ RPCOM RCST P Run Completion String as Follows: Completion Anchor w/ XO; 2 Jts - 4%2' IBT Tubing w/ Special Clearance Couplings; XO; 31 Jts - 31/2' EUE 41,a Tubing; 31/2" XN Nipple w/ RHC Plug; 2 Jts - 31/2" EUE Tubing; Baker Sliding Sleeve; 1 Jt - 3 EUE Tubing; XO; Premier Packer; XO; 10' Polished Bore Receptacle; 1 Jt - 31/2" EUE Tubing; XO; 47 Jts - 41/2' IBTM Tubing; 41/2" XN Nipple (No RHC Plug); 2 Jts - 41/2' Tubing; CAMCO GLM w/ DCK2 SOV; 67 Jts - 41" IBTM Tubing; CAMCO GLM w/ Dummy Valve; 123 Jts - 41/2" Tubing; CAMCO GLM w/ Dummy Valve; 65 Jts - 4'/2' IBTM Tubing t/ 14,337 MD 22:15 00:00 1.75 14,337 14,377 COMPZ RPCOM RURD P R/U Bal -O Nipple Control Line, Sheeves & Spools 11/09/2010 Continue to Run Completion String per Detail t/ 16,496' MD - Crossover to 4' DP and Drop the Packer Setting Rod /Ball - Circ & 1 BPM while Stinging Seals Into the Latch Receptacle; Verify Pressure Increase and P/U & Continue to Circulate While Waiting for Rod /Ball to Land - Acquire XO's and R/u HES Slickline Until - Push Rod /Ball Down t/ Seat in 31/2' XN Nipple @ 84° & POOH w/ Slickline - XO to 4" DP, RIH and Latch Anchor into Receptacle - Set Packer w/ 3500 Psi on Tubing - Shear SBE f/ SBR @ 15,415' MD, P/U 20' and Begin MOBM to Brine Displacement NOTE: Well Control Barriers During Slickline were KWM, TIW and Wire Line Valve (Wireline BOPE) - Pump-In Sub Utilized to Maintain Ability to Circulate 00:00 03:00 3.00 14,377 16,496 COMPZ RPCOM RCST P Continue to Run Completion Tubing as Follows: CAMCO Bal -O Nipple w/ Dual Control Lines; 50 Jts - 4%z" IBTM Tubing t/ 16,496' MD 03:00 06:00 3.00 16,496 16,612 COMPZ RPCOM RCST P M/U XO and RIH w/ Completion String on 4" DP ; Ran 1 Stand While Circulating @ 1 BPM w/ 300 Psi, Dropped Rod & Ball, Circ Single Down @ 1 BPM w/ 290 Psi - Observed Seals Enter Latch Receptacle @ 16,618' MD - P/U t/ 16,612' MD and Attempt to Circulate Ball & Rod Down w/ Rates f/ 1 to 2 BPM w/ 290 to 340 Psi - Ball Not on Seat in Lower 'XN' Nipple (Hole Angle 83 °) 06:00 07:00 1.00 16,612 16,612 COMPZ RPCOM OTHR T Clean rig floor & service rig 07:00 14:00 7.00 16,612 16,493 COMPZ RPCOM OTHR T Gather up XO subs to rig up HES slick line - PU HES slick line tool - Wait on XO subs f/ drilling tool house (Kup) - RU & test Wireline BOP in direction of flow to 1000 psi Page 47 of 50 1 Time Logs Date From To Dur S. Depth E. Depth Phase Code Subcode T Comment 14:00 20:30 6.50 16,493 16,493 COMPZ RPCOM SLKL T PJSM on rigging up slick line - RU HES slick line & make up tools - RIH w/ slick line tools to attempt to push rod & ball on seat. Pumped tools down f/ 154' above GLM # 2 @ 1 bbl /min @ 280 psi - Observed pressure increase in pressure as WL tools neared depth of RHC plug indicating ball on seat. POOH w/ wireline tools 20:30 21:45 1.25 16,493 16,618 COMPZ RPCOM TRIP P Crossover Tubing t/ XT39 DP - RIH w/ 1 Stand; Take Preliminary Up /Down Weights - M/U Single & Sting Into Anchor Latch Receptacle - Set 15K Down and Pulled 15 K Over Up Weight (Latched) - Released Weight and Set Premier Packer w/ 3500 Psi on Tubing - Held 3500 Psi f/ 10 Minutes - Bled Pressure t/ 1500 Psi and P/U 25K Over P/U to Shear SBE f/ PBR - L/D Single, Tail of SBE @ 15,382' MD and Anchor @ 16,618' MD 21:45 22:00 0.25 15,382 15,382 COMPZ RPCOM OWFF P OWFF (Static) 22:00 22:30 0.50 15,382 15,382 COMPZ RPCOM SFTY P PJSM on Displacing Wellbore Fluids f/ 9.6 MOBM to 9.6 PPG Inhibited and Neat Brine 22:30 00:00 1.50 15,382 15,382 COMPZ RPCOM CIRC P Displace Wellbore Fluids as Follows: Pump 26.2 Bbls of LVT -200; 70 Bbls Brine Transition Spacer; 38 Bbls Safe - Surf -O Spacer; 35 Bbls Viscosified Brine and 350 Bbls of "Neat" Brine 11/10/2010 Continue to Displace f/ 9.6 PPG MOBM to 9.6 PPG Clean & Inhibited Brine - Observe Well for 30 Minutes - Stand Back 1 Stand & Blow Down Top Drive; Well Flowing f/ Tubing - Installed & Closed TIW Valve - Mix & Spot 35 Bbl Weighted Pill in Tubing; Well Stopped U- Tubing - P/U 1 Jt of Tubing and Pulled the Wear Ring - P/U 1 Jt of Tubing and Hanger and Land Tubing w/ Anchor @ 16,618 and Seal Bore Extension @ 15,408' MD - Test Hanger Seals t/ 5000 Psi - OWFF (Static) - Pressure Test Tubing & Packer t/ 3500 Psi f/ 30 Minutes - Shear GLM Valve - Install TWC and Test in Direction of Flow t/ 1000 Psi f/ 10 Minutes - Wash & N/D BOPE - N/U Tree - Test Well Head Adapter Seals t/ 5000 Psi f/ 10 Minutes - Test Tree Body t/ 5000 Psi f/ Minutes - Pull TWC and Freeze Protect Well w/ 260 Bbls Diesel 00:00 02:30 2.50 15,382 15,382 COMPZ RPCOM CIRC P Continue to Displace Wellbore Fluids t/ 9.6 PPG Inhibited /Clean Brine; Pumped 150 Bbl "Neat" Brine; 258 Bbl Inhibited Brine and 32 Bbl "Neat" Brine 02:30 03:00 0.50 15,382 15,382 COMPZ RPCOM OWFF P OWFF (Fluid Falling In Annuls) 03:00 05:30 2.50 15,382 15,286 COMPZ RPCOM OTHR T S/B Stand of 4" DP - Blow Down Top Drive - Inhibited Brine Flowing Up Tubing & Fluid Dropping In Annulus - Screw in TIW Valve and Close to Prevent Exposure to Inhibited Mud - Mix Weighted Brine Pill - Observe Well, Fluid in Annulus Falling 05:30 06:00 0.50 15,286 15,286 COMPZ RPCOM CIRC T Spot 35 Bbl 9.9 PPG Brine Pill in Tubing - Blow down TD Page 48 of 50 • Time Logs Date From To Dur S. Depth E. Depth Phase Code Subcode T Comment 06:00 07:30 1.50 15,286 15,328 COMPZ RPCOM RCST P PU jt # 390 - MU wear bushing pulling tool & landing jt. B - Pull tbg running wear bushing - LD landing jt & pulling tool 07:30 09:30 2.00 15,328 16,618 COMPZ RPCOM HOSO P PU jt# 391 - MU tbg hanger - Install control lines to btm on tbg hanger & test connections to 5000 psi OK - Land tbg w/ Seal Tail @ 15,410' MD - RU & test annulus to 500 psi to confrim seals into PBR OK 09:30 10:30 1.00 16,618 16,618 COMPZ RPCOM HOSO P LD landing jt. A - Set TWC - MU landing jt. B - Test hanger seals to 5000 psi OK - LD landing jt. - Pull TWC - Monitor well - Static 10:30 11:00 0.50 16,618 16,618 COMPZ DRILL PULD P Clear rig floor - LD tbg tongs & control line spools 11:00 12:45 1.75 16,618 16,618 COMPZ DRILL PRTS P RU squeeze manifold and lines to tbg & annulus 12:45 14:45 2.00 16,618 16,618 COMPZ DRILL PRTS P PJSM on testing tbg & annulus - Tested tbg to 3500 psi for 30 mins. - Bleed tbg down to 2000 psi - Tested , annulus to 3500 psi for 30 mins - I Bleed down tbg to shear out DCK -2 shear valve in GLM @ 13,246' - Bleed off pressure on tbg & annulus - '('G rs� LD landing jt. A - Set TWC - Tested TWC in direction of flow by pressuring up through shear valve to 1000 psi for 10 mins. Bleed off ./"" pressure - RD lines & manifold 14:45 16:15 1.50 16,618 16,618 COMPZ DRILL RURD P Wash & Vacuum BOPE Stack - Blow Down Lines 16:15 17:45 1.50 0 0 COMPZ WHDBO NUND P N/D Riser and BOPE Stack 17:45 20:30 2.75 0 0 COMPZ WHDBO NUND P Terminate Bal -O Nipple Control Lines - N /lJ Tree 20:30 21:30 1.00 0 0 COMPZ WHDBO PRTS P Fill Tree w/ Diesel and Test Adapter Seals t/ 5000 Psi f/ 10 Minutes - Test Tree Body t/ 5000 Psi f/ 5 Minutes 21:30 22:00 0.50 0 0 COMPZ WHDBO RURD P R/U Hard Lines and Squeeze Manifold 22:00 00:00 2.00 0 0 COMPZ WHDBO FRZP P Pressure Test Lines t/ 2500 Psi - Freeze Protect Well by Pumping 260 Bbls Diesel Through Sheared Lower GLM 11/11/2010 RD lines - RU FMC lubricator & set BPV - Secure well - LD DP - S &C drill line - Cont. to LD DP - Work on Top Drive Air Swivel - Clean Rig of MOBM 00:00 02:30 2.50 0 0 COMPZ DRILL OTHR P R/D Hard Lines - Set BPV - Secure Well - Clean and Organize Cellar & Rig Floor 02:30 02:45 0.25 0 0 COMPZ DRILL SFTY P PJSM on UD 4" DP via the Mouse Hole 02:45 12:45 10.00 0 0 COMPZ DRILL PULD P UD 4" DP via the Mouse Hole for rig move (90 Stds) 12:45 13:00 0.25 0 0 COMPZ RIGMNT SFTY P PJSM on slip & cut drill lilne Page 49 of 50 411 • Time Logs Date From To Dur S. Depth E. Depth Phase Code Subcode T Comment 13:00 14:15 1.25 0 0 COMPZ RIGMNT SLPC P Slip & cut drill line 14:15 16:30 2.25 0 0 COMPZ DRILL PULD P Cont. to LD 4" DP via mouse hole for rig move 16:30 17:15 0.75 0 0 COMPZ RIGMNT SVRG P Service Rig 17:15 21:45 4.50 0 0 COMPZ DRILL PULD P Continue to UD 4" DP (81 Stands for Tour) 21:45 00:00 2.25 0 0 COMPZ DRILL OTHR P Clean MOBM & Prep for Move SIMOPS: Change Pad Eyes in Cellar - Begin Work on Top Drive Air Swivel 11/12/2010 Continue to Repair Top Drive While Cleaning MOBM f/ Pits, Drip Pans and Pipe Rack 00:00 03:30 3.50 0 0 COMPZ DRILL DMOB P Continue to Clean Pits, Pumps, Drip Pans and Pipe Racks while Making Repairs to the Top Drive - Install Bales and 5" Elevators 03:30 04:00 0.50 0 0 COMPZ DRILL DMOB P Clear Floor of Top Drive Parts/Tools 04:00 12:00 8.00 0 0 COMPZ DRILL DMOB P Finish cleaning rig & pits of MOBM Released rig @ 12;00 hrs. Page 50 of 50 CD4 -25 Post Rig Well Work DATE SUMMARY 11/14/10 Pulled Frac Sleeve @ 2244' CT , Well left shut, Return in the AM for restart. In Progress) 11/15/10 ABLE TO RETRIEVE BALL & ROD @ 15553' CTMD ON SECOND ATTEMPT. WELL LEFT SHUT IN AND FREEZE PROTECTED WITH DIESEL. RETURN IN THE PM TO PULL RHC PLUG. (IN PROGRESS) 11/16/10 FISH RHC PLUG BODY,RIH TO 15575 CTMD, TAG FISH, ENGAGE FISH TWICE W/ 10 K DN WEIGHT, NO INDICATION OF ENGAGING FISH,POH W/ FISH, FP WELL, IN PROGRESS, 11/18/10 RIH W/ CMU SHIFT TOOL TO VERIFY SLIDING SLEEVE CLOSED @ 15464 RKB, READY FOR SLICK LINE, IN PROGRESS 11/19/10 DRIFT w/ 2.64" TO 14,964' SLM. PERFORMED SBHPS @ 14,934' SLM. GRADIENT STOP @ 14,634' SLM. (PSI =3395 TEMP =161) SET CATCHER @ 13.346' RKB. PULLED SOV @ 13,244' RKB. IN PROGRESS. 11/20/10 SET OV (PORT =.25 ") @ 13,244' RKB. PULLED DV / SET GLV Port .188" (TRO =1816) @ 10,348' RKB. PULLED DV / SET GLV Port .188" (TRO =1840) @ 5066' RKB. PULLED CATCHER @ 13,338' SLM. SET FRAC SLEEVE IN BAL -O -NIP @ 2264' RKB. READY FOR FLOWBACK. 11/24/10 ATTEMPTED TO SET 3.5 PXN IN THE DB XN NIPPLE @ 15538 RKB,ENGAGED PXN IN DB NIPPLE W/ 4 DN JAR LICKS, 2 UP JAR LICKS FAILED TO SHEAR RUNNING TOOL OFF PXN IN THE NIPPLE,WELL FP, BACK TOMORROW TO RUN AGAIN, IN PROGRESS, 11/24/10 PULLED 3.81" FRAC SLV @ 2264' RKB. READY FOR CTU. 11/25/10 ATTEMP TO SET 3.5 PXN IN THE XN NIPPLE @ 15538 RKB,2ND FAILED ATTEMP,BHA & PIPE SHOWING SIGNS OF MECHANICAL SCARING, WELL FP, IN PROGRESS, 11/26/10 PERFORM FLUFF & STUFF FROM SURFACE TO 15570 CTMD, OPENED THE CMU SLIDING SLEEVE @ 15464 RKB, SEEN IMMEDIATE FALL OF WH PRESSURE WHEN RUNNING THRU W/ SHIFT TOOL, FP WELL, READY FOR SL, IN PROGRESS 11/27/10 DRIFT TBG W/ 3.62" MAGNET TO 15240' SLM 82 DEG. DEVIATION RECOVER METAL SHAVINGS, MEASURED BHP @ 14934' SLM MAX (PSI 2831.73 / TEMP 155.83), SET 3.812 ISO SLEEVE (2.75" ID) @ 2263' RKB. COMPLETE 12/6/10 PULLED ISO SLEEVE @ 2263' RKB; SET 3.812 WRDP -2 @ SAME (S /N: HSS -131). CLOSURE TESTED, GOOD. COMPLETE. • • ConocoPhillips(Alaska) Inc. Western North Slope CD4 Nanuq Pad _ ° =~ CD4 -25PB1 50103206087000 4: e Sperry Drilling Definitive Survey Report 10 November, 2010 'f HALLIE3URTDN i � Sperry Drilling • • ConocoPhillips (Alaska) Inc. Definitive Survey Report Company: ConocoPhillips(Alaska) Inc. Local Co- ordinate Reference: - -- Well CD4-25 Project: Western North Slope TVD Reference: _ ' CD4 -25 (36.4 +19) @ 55.40ft (Doyon 19) Site CD4 Nanuq Pad MD Reference: CD4 -25 (36.4 +19) @ 55.40ft ( Doyon 19) Well:, CD4 -25 North Reference: True Welibore: . CD4 -25PB1 Survey Calculation Method: -- . Minimum Curvature Design:- CD4 -25PB1 - Database: CPAI EDM Production -Project - Western North Slope Map System: US State Plane 1927 (Exact solution) System Datum: Mean Sea Level Geo Datum: NAD 1927 (NADCON CONUS) Using Well Reference Point Map Zone: Alaska Zone 04 Using geodetic scale factor Well CD4 -25 Well Position +N / -S 0.00ft Northing: 5,957,414.20ft Latitude: 70° 17' 31.791 N +E/ -W 0.00 ft Easting: 377,707.79 ft Longitude: 150° 59' 24.316 W Position Uncertainty 0.00 ft Wellhead Elevation: ft Ground Level: 19.00ft Weltbore CD4 -25PB1 Magnetics • Model Name Sample Date Declination Dip Angle . - Field Strength . - r) O . (nT) BGGM2009 9/9/2010 20.95 80.69 57,631 'Design CD4 -25PB1 Audit Notes: Version: 1.0 Phase: ACTUAL Tie On Depth: 36.40 Vertical Section: Depth From {TVD). +NI-S +EI -W - : Direction _ (ft) (ft) (ft) { °) 36.40 0.00 0.00 332.00 Survey Program . Date From _ To - (ft) - (ft) Survey (Wellbore) - Tool Name Description Survey Date 82.00 915.00 CD4 -25 Gyro (CD4- 25PB1) GYD -GC -SS Gyrodata gyro single shots 9/10/2010 12:C 972.83 2,922.31 CD4 -25 (R100) (CD4- 25PB1) MWD +IFR- AK- CAZ -SC MWD +IFR AK CAZ SCC 9/10/2010 12:C 2,990.17 15,911.89 CD4 -25 (R300) (CD4- 25PB1) MWD +IFR- AK- CAZ -SC MWD +IFR AK CAZ SCC 9/15/2010 12:C Survey. Map Map Vertical MD Inc Azi TVD ; TVDSS +NI-S +EI W Northing Easting DLS Section (ft) _ (°) (') (ft) (ft) (ft) (ft) (ft) (ft) ( (ft) Survey Tool Name - 36.40 0.00 0.00 36.40 -19.00 0.00 0.00 5,957,414.20 377,707.79 0 -00 0.00 UNDEFINED 82.00 0.13 11.78 82.00 26.60 0.05 0.01 5,957,41425 377,707.81 029 0.04 GYD -GC -SS (1) 174.00 0.15 12.08 174.00 118.60 0.27 0.06 5,957,414.47 377,707.86 0.02 0.21 GYD -GC -SS (1) 266.00 0.08 350.57 266.00 210.60 0.45 0.07 5,957,414.65 377,707.87 0.09 0.37 GYD -GC -SS (1) 358.00 0.76 209.09 358.00 302.60 -0.02 -0.24 5,957,414.19 377,707.56 0.90 0.09 GYD -GC -SS (1) 451.00 1.66 201.79 450.98 395.58 -1.81 -1.04 5,957,412.41 377,706.73 0.98 -1.11 GYD -GC -SS (1) 543.00 2.56 199.16 542.91 487.51 -4.99 -2.20 5,957,409.25 377,705.51 0.98 -3.37 GYD -GC -SS (1) 636.00 4.60 206.74 635.73 580.33 -10.28 -4.56 5,957,404.00 377,703.06 2.25 -6.93 GYD -GC -SS (1) 728.00 7.83 211.61 727.17 671.77 -18.91 -9.51 5,957,395.45 377,697.98 3.55 -12.23 GYD -GC -SS (1) 820.00 11.88 214.30 817.80 762.40 -32.08 -18.13 5,957,382.42 377,689.14 4.43 -19.81 GYD -GC -SS (1) 915.00 13.76 211.65 910.43 855.03 -49.78 -29.57 5,957,364.92 377,677.42 2.07 -30.07 GYD -GC -SS (1) 972.83 13.86 213.30 966.58 911.18 -61A2 -36.99 5,957,353.39 377,669.82 0.70 -36.87 MWD +IFR- AK- CAZ -SC (2) 11/10/2010 3 :15 :02PM Page 2 COMPASS 2003.16 Build 69 • ConocoPhillips (Alaska) Inc. Definitive Survey Report Company: ConocoPhillips(Alaska) Inc. Local Co- ordinate Reference: - Well CD4 - 25 Project: Western North Slope TVD Reference: CD4 -25 (36.4 +19) @ 55.40ft (Doyon 19) - Site; CD4 Nanuq Pad MD Reference: CD4 -25 (36.4 +19) @ 55.40ft (Doyon 19) Well: CD4 - 25 North Reference: True Wetibore: CD4 - 25PB1 Survey Calculation Method: Minimum Curvature Design: CD4 - 25PB1 Database: CPAI EDM Production Survey Map Map Vertical MD Inc Azi TVD TVDSS +N/-S _ +El-W No rthing Easting DLS Section -- (ft} _ 4 ) ( ) • (ft) (f) (ft) (ft) (tt) (ft) rum fft) Survey Toot Name 1,067.06 1525 212.48 1,057.79 1,002.39 -81.31 -49.84 5,957,333.72 377,656.64 1.49 -48.39 MWD +IFR- AK- CAZ -SC (2) 1,162.32 18.17 213.66 1,149.02 1,093.62 - 104.24 -64.80 5,957,311.03 377,641.31 3.09 -61.62 MW D+ I FR-AK-CAZ-SC (2) 1,255.24 19.89 209.90 1,236.86 1,181.46 - 130.01 -80.71 5,957,285.53 377,624.98 2.27 -76.90 MWD +IFR- AK- CAZ -SC (2) 1,350.82 23.35 210.06 1,325.70 1,270.30 - 160.51 -98.31 5,957,255.33 377,606.89 3.62 -95.56 MWD +IFR- AK- CAZ -SC (2) 1,447.75 26.83 211.30 1,413.47 1,358.07 - 195.83 - 119.30 5,957,220.35 377,585.33 3.63 - 116.90 MWD+ I FR-AK-CAZ-SC (2) 1,541.70 30.09 211.33 1,496.06 1,440.66 - 234.08 - 142.57 5,957,182.49 377,561.45 3.47 - 139.75 MWD +IFR- AK- CAZ -SC (2) 1,638.38 33.77 212.44 1,578.10 1,522.70 - 277.47 - 169.60 5,957,139.55 377,533.72 3.85 - 165.37 MWD +IFR- AK- CAZ -SC (2) 1,730.76 36.58 213.41 1,653.60 1,598.20 - 322.13 - 198.53 5,957,095.37 377,504.07 3.10 - 191.22 MWD +IFR- AK- CAZ -SC (2) 1,826.60 39.06 208.74 1,729.32 1,673.92 - 372.46 - 228.79 5,957,045.54 377,473.00 3.95 - 221.46 MWD +IFR- AK- CAZ -SC (2) 1,922.70 41.92 208.37 1,802.40 1,747.00 - 427.27 - 258.61 5,956,991.23 377,442.29 2.99 - 255.85 MWD +IFR- AK- CAZ -SC (2) 2,017.82 44.44 210.62 1,871.76 1,816.36 - 483.89 - 290.67 5,956,935.14 377,409.31 3.10 - 290.79 MWD +IFR- AK- CAZ -SC (2) 2,112.58 46.85 211.47 1,938.00 1,882.60 - 541.93 - 325.62 5,956,877.68 377,373.43 2.62 - 325.63 MWD +IFR- AK- CAZ -SC (2) 2,207.69 49.63 211.62 2,001.34 1,945.94 - 602.39 - 362.73 5,956,817.84 377,335.34 2.93 - 361.59 MWD +IFR- AK- CAZ -SC (2) 2,302.58 53.69 213.01 2,060.19 2,004.79 - 665.26 - 402.53 5,956,755.63 377,294.53 4.43 - 398.41 MWD +IFR- AK- CAZ -SC (2) 2,395.42 56.49 212.83 2,113.32 2,057.92 - 729.16 - 443.90 5,956,692.41 377,252.13 3.02 - 435.41 MW D+ I FR-AK-CAZ-SC (2) 2,492.72 59.59 212.78 2,164.81 2,109.41 - 798.54 - 488.62 5,956,623.78 377,206.29 3.19 - 475.68 MWD +IFR- AK- CAZ -SC (2) 2,588.07 60.72 210.16 2,212.27 2,156.87 - 869.08 - 531.78 5,956,553.96 377,161.99 2.66 - 517.69 MWD +IFR- AK- CAZ -SC (2) 2,683.02 60.29 210.13 2,259.02 2,203.62 - 940.54 - 573.28 5,956,483.18 377,119.33 0.45 - 561.31 MWD +IFR- AK- CAZ -SC (2) 2,778.27 60.89 210.26 2,305.79 2,250.39 - 1,012.26 - 615.02 5,956,412.16 377,076.44 0.64 - 605.04 MWD +IFR- AK- CAZ -SC (2) 2,874.02 61.10 210.90 2,352.22 2,296.82 - 1,084.35 - 657.62 5,956,340.78 377,032.68 0.62 - 648.69 MWD +IFR- AK- CAZ -SC (2) 2,922.31 60.94 211.36 2,375.62 2,320.22 - 1,120.51 - 679.46 5,956,304.98 377,010.26 0.90 - 670.37 MWD +IFR- AK- CAZ -SC (2) 2,990.17 60.65 211.81 2,408.73 2,353.33 - 1,170.97 - 710.48 5,956,255.04 376,978.42 0.72 - 700.36 MWD +IFR- AK- CAZ -SC (3) 3,051.46 60.83 211.52 2,438.68 2,383.28 - 1,216.48 - 738.55 5,956,209.99 376,949.61 0.51 - 727.36 MWD +IFR- AK- CAZ -SC (3) 3,146.67 61.19 211.83 2,484.83 2,429.43 - 1,287.36 - 782.28 5,956,139.85 376,904.74 0.47 - 769.41 MWD +IFR- AK- CAZ -SC (3) 3,241.60 61.06 211.53 2,530.67 2,475.27 - 1,358.10 - 825.94 5,956,069.83 376,859.94 0.31 - 811.37 MWD +IFR- AK- CAZ -SC (3) 3,336.80 61.13 211.49 2,576.69 2,521.29 - 1,429.15 - 869.50 5,955,999.50 376,815.24 0.08 - 853.66 MWD +IFR- AK- CAZ -SC (3) 3,431.71 61.25 211.39 2,622.42 2,567.02 - 1,500.10 - 912.87 5,955,929.27 376,770.72 0.16 - 895.94 MW D+ I FR-AK-CAZ-SC (3) 3,526.55 61.20 211.12 2,668.08 2,612.68 - 1,571.17 - 956.00 5,955,858.92 376,726.44 0.26 - 938.44 MWD +IFR- AK- CAZ -SC (3) 3,620.96 61.40 210.72 2,713.41 2,658.01 - 1,642.21 - 998.56 5,955,788.59 376,682.74 0.43 - 981.19 MWD +IFR- AK- CAZ -SC (3) 3,712.85 61.47 210.96 2,757.35 2,701.95 - 1,711.50 - 1,039.93 5,955,719.98 376,640.25 0.24 - 1,022.95 MWD+ I FR-AK-CAZ-SC (3) 3,810.40 61.19 210.25 2,804.15 2,748.75 - 1,785.17 - 1,083.50 5,955,647.04 376,595.48 0.70 - 1,067.54 MWD +IFR- AK- CAZ -SC (3) 3,906.22 61.21 209.92 2,850.32 2,794.92 - 1,857.82 - 1,125.60 5,955,575.09 376,552.22 0.30 - 1,111.93 MWD +IFR- AK- CAZ -SC (3) 4,000.93 60.77 210.17 2,896.25 2,840.85 - 1,929.52 - 1,167.07 5,955,504.08 376,509.59 0.52 - 1,155.76 MWD +IFR- AK- CAZ -SC (3) 4,092.44 60.70 209.63 2,940.98 2,885.58 - 1,998.73 - 1,206.86 5,955,435.54 376,468.68 0.52 - 1,198.18 MWD +IFR- AK- CAZ -SC (3) 4,188.34 60.64 209.71 2,987.96 2,932.56 - 2,071.37 - 1,248.25 5,955,363.58 376,426.12 0.10 - 1,242.90 MWD +IFR- AK- CAZ -SC (3) 4,284.16 60.92 210.03 3,034.73 2,979.33 - 2,143.89 - 1,289.89 5,955,291.76 376,383.30 0.41 - 1,287.37 MW D+ I FR-AK-CAZ-SC (3) 4,378.53 61.14 210.34 3,080.44 3,025.04 - 2,215.25 - 1,331.41 5,955,221.08 376,340.64 0.37 - 1,330.90 MW D+ I FR-AK-CAZ-SC (3) 4,474.91 61.01 210.86 3,127.06 3,071.66 - 2,287.86 - 1,374.35 5,955,149.18 376,296.53 0.49 - 1,374.85 MWD +IFR- AK- CAZ -SC (3) 4,571.70 61.18 210.63 3,173.84 3,118.44 - 2,360.69 - 1,417.66 5,955,077.08 376,252.04 0.27 - 1,418.81 MWD +IFR- AK- CAZ -SC (3) 4,666.33 61.01 210.51 3,219.58 3,164.18 - 2,432.01 - 1,459.80 5,955,006.46 376,208.75 0.21 - 1,462.01 MWD +IFR- AK- CAZ -SC (3) 11/10/2010 3: 15 :02PM Page 3 COMPASS 2003.16 Build 69 • ConocoPhillips (Alaska) Inc. Definitive Survey Report Company: ConocoPhillips(Alaska) Inc. Local Co- ordinate Reference: Well CD4 -25 Project Western North Slope TVD Reference:. - CD4-25 (36.4 +19) @ 55.40ft (Doyon 19) Site: CD4 Nanuq Pad MP Reference: CD4-25 (36.4 +19) @ 55.40ft (Doyon 19) Well: CD4 -25 ,North Reference: True Wellbore: CD4 -25 PB1 Survey Calculation Method: Minimum Curvature Design: CD4 -25PB1 Database: - CPAI EDM Production Survey Map_ - Map Vertical MO Inc Azi TVD TVDSS +N/-S +Et-W Northing Easting DLS Section (ft) ( °) ( • (f t) (ft) (ft) (ft) (ft) (ft) (1,100') (ft) Survey Tool Name 4,761.64 60.98 210.63 3265.80 3,210.40 - 2,503.78 - 1,502.19 5,954,935.39 376,165.20 0.11 - 1,505.48 MWD +IFR- AK- CAZ -SC (3) 4,853.97 60.78 210.90 3,310.73 3,255.33 - 2,573.09 - 1,543.45 5,954,866.77 376,122.82 0.33 - 1,547.30 MWD +IFR- AK- CAZ -SC (3) 4,951.09 60.86 211.36 3,358.08 3,302.68 - 2,645.68 - 1,587.29 5,954,794.91 376,077.81 0.42 - 1,590.81 MWD+ I FR-AK-CAZ-SC (3) 5,044.90 60.70 211.96 3,403.87 3,348.47 - 2,715.36 - 1,630.26 5,954,725.94 376,033.72 0.58 - 1,632.16 MWD +IFR AK - CAZ - (3) 5,141.80 60.76 211.90 3,451.25 3,395.85 - 2,787.10 - 1,674.96 5,954,654.94 375,987.85 0.08 - 1,674.52 MWD +IFR- AK- CAZ -SC (3) 5,236.70 60.98 212.05 3,497.45 3,442.05 - 2,857.42 - 1,718.86 5,954,585.35 375,942.82 0.27 - 1,716.00 MWD +IFR- AK- CAZ -SC (3) 5,330.75 60.91 212.33 3,543.12 3,487.72 - 2,927.00 - 1,762.66 5,954,516.50 375,897.90 0.27 - 1,756.87 MWD +IFR- AK- CAZ -SC (3) 5,427.56 61.12 211.99 3,590.04 3,534.64 - 2,998.69 - 1,807.74 5,954,445.56 375,851.67 0.38 - 1,799.01 MWD +IFR- AK- CAZ -SC (3) 5,521.17 61.47 211.07 3,635.00 3,579.60 - 3,068.67 - 1,850.67 5,954,376.29 375,807.61 0.94 - 1,840.64 MWD +IFR- AK- CAZ -SC (3) 5,616.72 61.12 209.89 3,680.89 3,625.49 - 3,140.90 - 1,893.18 5,954,304.77 375,763.93 1.14 - 1,884.45 MW0+1 FR- AK- CAZ -SC (3) 5,712.40 61.11 210.03 3,727.11 3,671.71 - 3,213.48 - 1,935.02 5,954,232.89 375,720.92 0.13 - 1,928.90 MWD +IFR- AK- CAZ -SC (3) 5,807.30 60.67 209.88 3,773.28 3,717.88 - 3,285.32 - 1,976.42 5,954,161.74 375,678.36 0.48 - 1,972.89 MWD +IFR- AK- CAZ -SC (3) 5,901.99 60.72 209.87 3,819.62 3,764.22 - 3,356.92 - 2,017.55 5,954,090.83 375,636.07 0.05 - 2,016.80 MWD +IFR- AK- CAZ -SC (3) 5,992.66 60.85 209.81 3,863.88 3,808.48 - 3,425.56 - 2,056.92 5,954,022.84 375,595.59 0.15 - 2,058.92 MWD +IFR- AK- CAZ -SC (3) 6,091.94 60.90 209.86 3,912.20 3,856.80 - 3,500.79 - 2,100.07 5,953,948.32 375,551.23 0.07 - 2,105.09 MW D+ I FR-AK-CAZ-SC (3) 6,186.63 60.99 210.09 3,958.19 3,902.79 - 3,572.49 - 2,141.43 5,953,877.31 375,508.72 023 - 2,148.99 MW D+ I FR-AK-CAZ-SC (3) 6,282.15 61.19 209.83 4,004.36 3,948.96 - 3,644.94 - 2,183.18 5,953,805.56 375,465.79 0.32 - 2,193.34 MW D+ I FR-AK-CAZ-SC (3) 6,377.84 61.74 210.26 4,050.07 3,994.67 - 3,717.71 - 2,225.28 5,953,733.49 375,422.52 0.70 - 2,237.84 MWD +IFR- AK- CAZ -SC (3) 6,471.99 63.22 210.78 4,093.58 4,038.18 - 3,789.63 - 2,267.68 5,953,662.27 375,378.96 1.65 - 2,281.43 MWD +IFR- AK- CAZ -SC (3) 6,567.37 64.25 211.62 4,135.78 4,080.38 - 3,862.79 - 2,311.99 5,953,589.85 375,333.47 1.34 - 2,325.23 MWD +IFR- AK- CAZ -SC (3) 6,662.97 65.06 212.04 4,176.71 4,121.31 - 3,936.19 - 2,357.56 5,953,517.20 375,286.72 0.94 - 2,368.65 MWD +IFR- AK- CAZ -SC (3) 6,753.45 65.88 212.11 4,214.27 4,158.87 - 4,005.94 - 2,401.27 5,953,448.18 375,241.88 0.91 - 2,409.71 MWD +IFR- AK- CAZ -SC (3) 6,854.09 66.90 212.28 4,254.58 4,199.18 - 4,083.98 - 2,450.40 5,953,370.96 375,191.49 1.03 - 2,455.54 MWD +IFR- AK- CAZ -SC (3) 6,949.59 67.23 212.29 4,291.79 4,236.39 - 4,158.33 - 2,497.38 5,953,297.39 375,143.31 0.35 - 2,499.14 MWD +IFR- AK- CAZ -SC (3) 7,044.44 67.03 211.59 4,328.66 4,273.26 - 4,232.49 - 2,543.61 5,953,224.00 375,095.88 0.71 - 2,542.92 MWD +IFR- AK- CAZ -SC (3) 7,138.04 66.76 211.77 4,365.39 4,309.99 - 4,305.76 - 2,588.82 5,953,151.48 375,049.49 0.34 - 2,586.38 MWD +IFR- AK- CAZ -SC (3) 7,233.68 66.76 211.03 4,403.12 4,347.72 - 4,380.76 - 2,634.61 5,953,077.23 375,002.49 0.71 - 2,631.11 MWD +IFR- AK- CAZ -SC (3) 7,328.95 66.69 210.66 4,440.77 4,385.37 - 4,455.90 - 2,679.48 5,953,002.84 374,956.41 0.36 - 2,676.39 MWD +IFR- AK- CAZ -SC (3) 7,423.98 67.03 210.50 4,478.12 4,422.72 - 4,531.13 - 2,723.94 5,952,928.35 374,910.74 0.39 - 2,721.94 MWD +IFR- AK- CAZ -SC (3) 7,519.01 66.90 210.58 4,515.30 4,459.90 - 4,606.45 - 2,768.37 5,952,853.77 374,865.09 0.16 - 2,767.58 MWD +IFR- AK- CAZ -SC (3) 7,613.92 66.97 210.17 4,552.48 4,497.08 - 4,681.79 - 2,812.53 5,952,779.17 374,819.71 0.40 - 2,813.37 MWD +IFR- AK- CAZ -SC (3) 7,707.60 67.29 210.39 4,588.89 4,533.49 - 4,756.33 - 2,856.05 5,952,705.35 374,774.99 0.40 - 2,858.76 MWD +IFR- AK- CAZ -SC (3) 7,803.30 66.96 210.60 4,626.09 4,570.69 - 4,832.31 - 2,900.80 5,952,630.12 374,729.02 0.40 - 2,904.83 MWD +I AK - CAZ - (3) 7,899.11 67.17 210.27 4,663.43 4,608.03 - 4,908.38 - 2,945.49 5,952,554.79 374,683.09 0.39 - 2,951.02 MWD +IFR- AK- CAZ -SC (3) 7,994.44 66.89 210.13 4,700.63 4,645.23 - 4,984.24 - 2,989.64 5,952,479.66 374,637.72 0.32 - 2,997.27 MWD +IFR- AK- CAZ -SC (3) 8,084.20 66.95 210.43 4,735.82 4,680.42 - 5,055.55 - 3,031.28 5,952,409.04 374,594.93 0.31 - 3,040.69 MWD +IFR- AK- CAZ -SC (3) 8,179.20 67.03 210.89 4,772.95 4,717.55 - 5,130.77 - 3,075.87 5,952,334.57 374,549.13 0.45 - 3,086.17 MWD +IFR- AK- CAZ -SC(3) 8,279.52 66.89 211.27 4,812.22 4,756.82 - 5,209.84 - 3,123.53 5,952,256.30 374,500.19 0.38 - 3,133.60 MWD +IFR- AK- CAZ -SC (3) 8,374.74 66.97 211.94 4,849.53 4,794.13 - 5,284.45 - 3,169.44 5,952,182.45 374,453.08 0.65 - 3,177.93 MWD +IFR- AK- CAZ -SC (3) 8,465.41 67.16 211.93 4,884.86 4,829.46 - 5,355.31 - 3,213.61 5,952,112.32 374,407.77 0.21 - 3,219.76 MWD +IFR- AK- CAZ -SC (3) 11110/2010 3 :15 :02PM Page 4 COMPASS 2003.16 Build 69 ConocoPhillips (Alaska) Inc. Definitive Survey Report Company: ConocoPhillips( Alaska) Inc. Local Co- ordinate R eference: Well CD4 -25 Project: Western North Slope TVD Reference:. CD4 -25 (36.4 +19) @ 55.40ft (Doyon 19) Site : - CD4 Nanuq Pad MO Reference: CD4 -25 (36.4 +19) @ 55.40ft ( Doyon 19) Welh CD4 - 25 North Reference: True Welibore: CD4 - 25PB1 Survey Calculation Method: Minimum Curvature Design: CD4 -25PB1 Database: - - CPAI EDM Production Survey Map Map Vertical MD Inc Azi TVD - - TVDSS +N/-S - .+E/-W Northing - Easting DLS Section - (ft) ( °) (°) (ft) ( (ft) - _ (ft) ( ft} - - (ft) ( ° -110U ' ) (ft} Survey Tool Name . 8,565.15 67A2 211A1 4,923.37 4,867.97 - 5,433.62 - 3,261.91 5,952,034.81 374,358.20 0.55 - 3,266.22 MWD +IFR- AK- CAZ -SC (3) 8,655.83 67.37 211.28 4,958.22 4,902.82 - 5,505.11 - 3,305.46 5,951,964.04 374,313.50 0.14 - 3,308.91 MWD +IFR- AK- CAZ -SC (3) 8,753.41 67.44 210.75 4,995.71 4,940.31 - 5,582.32 - 3,351.88 5,951,887.60 374,265.83 0.51 - 3,355.29 MWD +IFR- AK- CAZ -SC (3) 8,846.85 67.35 210.91 5,031.63 4,976.23 - 5,656.39 - 3,396.09 5,951,814.27 374,220.43 0.19 - 3,399.93 MWD +IFR- AK- CAZ -SC (3) 8,944.62 66.77 211.12 5,069.74 5,014.34 - 5,733.56 - 3,442.48 5,951,737.87 374,172.79 0.63 -3,446.29 MWD +IFR- AK- CAZ -SC (3) 9,037.17 66.76 211.27 5,106.25 5,050.85 - 5,806.31 - 3,486.53 5,951,665.86 374,127.57 0.15 -3,489.84 MWD +IFR- AK- CAZ -SC (3) 9,134.11 66.82 210.91 5,144.45 5,089.05 - 5,882.60 - 3,532.54 5,951,590.33 374,080.33 0.35 - 3,535.60 MWD +IFR- AK- CAZ -SC (3) 9,228.35 66.89 211.09 5,181.50 5,126.10 - 5,956.88 - 3,577.17 5,951,516.79 374,034.50 0.19 - 3,580.23 MWD +IFR- AK- CAZ -SC (3) 9,324.06 66.89 210.72 5,219.06 5,163.66 - 6,032.41 - 3,622.38 5,951,442.01 373,988.07 0.36 - 3,625.70 MWD +IFR- AK- CAZ -SC (3) 9,415.72 67.03 211.16 5,254.94 5,199.54 - 6,104.76 - 3,665.75 5,951,370.39 373,943.53 0.47 - 3,669.22 MWD +IFR- AK- CAZ -SC (3) 9,514.52 67.10 211.55 5,293.44 5,238.04 - 6,182.46 - 3,713.09 5,951,293.47 373,894.93 0.37 - 3,715.60 MWD +IFR- AK- CAZ -SC (3) 9,608.74 67.04 211.16 5,330.15 5,274.75 - 6,256.56 - 3,758.24 5,951,220.12 373,848.59 0.39 - 3,759.83 MWD +IFR- AK- CAZ -SC (3) 9,704.99 66.69 211.16 5,367.96 5,312.56 -6,332.30 - 3,804.04 5,951,145.14 373,801.57 0.36 - 3,805.20 MWD +IFR- AK- CAZ -SC (3) 9,799.67 66.50 211.36 5,405.57 5,350.17 - 6,406.58 - 3,849.13 5,951,071.62 373,755.28 0.28 - 3,849.61 MWD +IFR- AK- CAZ -SC (3) 9,895.11 66.82 211.17 5,443.38 5,387.98 - 6,481.48 - 3,894.61 5,950,997.47 373,708.59 0.38 - 3,894.40 MWD +IFR- AK- CAZ -SC (3) 9,988.98 67.02 211.46 5,480.18 5,424.78 - 6,555.26 - 3,939.49 5,950,924.44 373,662.52 0.36 - 3,938.47 MWD +IFR- AK- CAZ -SC (3) 10,085.17 67.29 211.73 5,517.53 5,462.13 - 6,630.76 - 3,985.94 5,950,849.70 373,614.86 0.38 - 3,983.33 MWD +IFR- AK- CAZ -SC (3) 10,179.76 67.10 211.30 5,554.19 5,498.79 - 6,705.09 - 4,031.51 5,950,776.13 373,568.08 0.46 - 4,027.57 MWD +IFR- AK- CAZ -SC (3) 10,274.95 66.89 210.94 5,591.39 5,535.99 - 6,780.10 - 4,076.80 5,950,701.87 373,521.58 0.41 - 4,072.54 MWD +IFR- AK- CAZ -SC (3) 10,370.08 67.16 211.24 5,628.52 5,573.12 - 6,855.11 - 4,122.03 5,950,627.62 373,475.15 0.41 - 4,117.53 MWD +IFR- AK- CAZ -SC (3) 10,463.04 66.91 210.94 5,664.79 5,609.39 - 6,928.40 - 4,166.23 5,950,555.06 373,429.77 0.40 - 4,161.49 MWD +IFR- AK- CAZ -SC (3) 10,560.30 66.89 210.39 5,702.95 5,647.55 - 7,005.36 - 4,211.85 5,950,478.86 373,382.90 0.52 - 4,208.02 MWD +IFR- AK- CAZ -SC (3) 10,653.92 67.24 210.21 5,739.43 5,684.03 - 7,079.80 - 4,255.35 5,950,405.15 373,338.20 0.41 - 4,253.32 MWD +IFR- AK- CAZ -SC (3) 10,744.64 67.15 209.69 5,774.60 5,719.20 - 7,152.26 - 4,297.10 5,950,333.38 373,295.27 0.54 - 4,297.70 MWD +IFR- AK- CAZ -SC (3) 10,845.49 66.96 209.45 5,813.91 5,758.51 - 7,233.03 - 4,342.93 5,950,253.37 373,248.14 0.29 - 4,347.50 MWD +IFR- AK- CAZ -SC (3) 10,940.10 66.74 210.08 5,851.11 5,795.71 - 7,308.55 - 4,386.12 5,950,178.57 373,203.74 0.65 - 4,393.91 MWD +IFR- AK- CAZ -SC (3) 11,034.70 66.89 209.99 5,888.35 5,832.95 - 7,383.83 - 4,429.65 5,950,104.02 373,158.99 0.18 - 4,439.94 MWD +IFR- AK- CAZ -SC (3) 11,130.47 67.70 210.78 5,925.32 5,869.92 - 7,460.04 - 4,474.33 5,950,028.55 373,113.08 1.14 - 4,486.25 MWD +IFR- AK- CAZ -SC (3) 11,223.45 67.03 212.09 5,961.10 5,905.70 - 7,533.26 - 4,519.09 5,949,956.07 373,067.14 1.49 - 4,529.89 MWD +IFR- AK- CAZ -SC (3) 11,320.12 66.74 212.82 5,999.06 5,943.66 - 7,608.28 - 4,566.80 5,949,881.84 373,018.22 0.76 - 4,573.73 MWD +IFR- AK- CAZ -SC (3) 11,415.33 66.89 212.66 6,036.54 5,981.14 - 7,681.90 - 4,614.13 5,949,809.01 372,969.70 0.22 - 4,616.51 MWD +IFR- AK- CAZ -SC (3) 11,506.49 67.23 212.59 6,072.07 6,016.67 - 7,752.61 - 4,659.39 5,949,739.06 372,923.30 0.38 - 4,657.69 MWD +IFR- AK- CAZ -SC (3) 11,606.93 66.70 212.80 6,111.37 6,055.97 - 7,830.39 - 4,709.32 5,949,662.10 372,872.12 0.56 - 4,702.93 MWD +IFR- AK- CAZ -SC (3) 11,695.73 66.09 213.46 6,146.93 6,091.53 - 7,898.53 - 4,753.79 5,949,594.70 372,826.55 0.97 - 4,742.22 MWD +IFR- AK- CAZ -SC (3) 11,794.67 66.24 216.53 6,186.92 6,131.52 - 7,972.66 - 4,805.69 5,949,521.43 372,773.46 2.84 - 4,783.31 MWD +IFR- AK- CAZ -SC (3) 11,890.19 66.56 219.14 6,225.17 6,169.77 - 8,041.78 - 4,859.37 5,949,453.20 372,718.66 2.53 - 4,819.13 MWD +IFR- AK- CAZ -SC (3) 11,983.92 66.69 221.06 6,262.36 6,206.96 - 8,107.59 - 4,914.79 5,949,388.30 372,662.18 1.89 - 4,851.22 MWD +IFR- AK- CAZ -SC (3) 12,080.18 66.56 224.11 6,300.56 6,245.16 - 8,172.64 - 4,974.57 5,949,324.24 372,601.36 2.91 - 4,880.59 MWD +IFR- AK- CAZ -SC (3) 12,173.37 65.95 226.28 6,338.08 6,282.68 - 8,232.74 - 5,035.08 5,949,265.13 372,539.88 2.23 - 4,905.25 MWD +IFR- AK- CAZ -SC (3) 12,270.50 65.67 228.09 6,377.89 6,322.49 - 8,292.96 - 5,100.07 5,949,205.99 372,473.92 1.72 - 4,927.91 MWD +IFR- AK- CAZ -SC (3) 11/10/2010 3:15:02PM Page 5 COMPASS 2003.16 Build 69 ConocoPhillips (Alaska) Inc. Definitive Survey Report Company: ConocoPhillips(Alaska) Inc. Local Co- ordinate Reference: - Well CD4 -25 Project: - Western North Slope TVD Reference; CD4 -25 (36.4 +19) @ 55.40ft (Doyon 19) Site: CD4 Nanuq Pad MD Reference: CD4 -25 (36.4 +19) @ 55.40ft ( Doyon 19) Weil: CD4 -25 North Reference: True Wellbore: CD4 -25PB1 Survey Calm:dation Method: Minimum Curvature Design: CD4 -25PB1 Database: CPAI EDM Production Survey Map Map Vertical - _ MD Inc Azi TVD _ TVDSS +N/-S_ +E! W Northing Easting -ALS. - Section (ft) ( °) ( °) (ft) (ft) (ft) (ft) (ft) (ft) ( "f100') _ (ft) Survey Tool Name = . 12,362.78 65.61 230.82 6,415.96 6,360.56 - 8,347.60 - 5,163.94 5,949,152.40 372,409.18 2.70 - 4,946.17 MWD +IFR- AK- CAZ -SC (3) 12,458.55 66.16 234.39 6,455.09 6,399.69 - 8,400.67 - 5,233.38 5,949,100.47 372,338.89 3.45 - 4,960.43 MWD +IFR- AK- CAZ -SC (3) 12,554.15 66.44 238.65 6,493.54 6,438.14 - 8,448.94 - 5,306.37 5,949,053.40 372,265.13 4.09 - 4,968.78 MWD +IFR- AK- CAZ -SC (3) 12,650.64 66.15 242.36 6,532.34 6,476.94 - 8,492.43 - 5,383.25 5,949,011.17 372,187.56 3.53 -4,971.09 MWD +IFR- AK- CAZ -SC (3) 12,745.61 66.23 245.51 6,570.69 6,515.29 - 8,530.60 - 5,461.29 5,948,974.27 372,108.92 3.04 - 4,968.15 MWD +IFR- AK- CAZ -SC (3) 12,839.03 67.16 248.04 6,607.65 6,552.25 - 8,564.42 - 5,540.13 5,948,941.74 372,029.55 2.68 - 4,961.01 MWD +IFR- AK- CAZ -SC (3) 12,928.63 67.69 250.45 6,642.05 6,586.65 - 8,593.74 - 5,617.49 5,948,913.69 371,951.73 2.55 - 4,950.57 MWD +IFR- AK- CAZ -SC (3) 13,027.02 68.09 253.53 6,679.09 6,623.69 - 8,621.91 - 5,704.16 5,948,886.93 371,864.61 2.93 - 4,934.76 MWD +IFR- AK- CAZ -SC (3) 13,119.83 68.23 256.78 6,713.63 6,658.23 - 8,643.98 - 5,787.42 5,948,866.22 371,781.01 3.25 - 4,915.15 MW D+ I FR-AK-CAZ-SC (3) 13,211.67 69.15 259.58 6,747.01 6,691.61 - 8,661.50 - 5,871.16 5,948,850.07 371,697.01 3.01 - 4,891.31 MWD +IFR- AK- CAZ -SC (3) 13,308.79 69.95 262.82 6,780.95 6,725.55 - 8,675.41 - 5,961.07 5,948,837.62 371,606.89 3.23 - 4,861.38 MWD +IFR- AK- CAZ -SC (3) 13,400.10 70.80 265.19 6,811.62 6,756.22 - 8,684.39 - 6,046.60 5,948,830.04 371,521.23 2.62 - 4,829.15 MWD +IFR- AK- CAZ -SC (3) 13,490.33 71.78 267.25 6,840.57 6,785.17 - 8,690.02 - 6,131.87 5,948,825.80 371,435.89 2.42 - 4,794.09 MWD +IFR- AK- CAZ -SC (3) 13,583.63 72.24 270.69 6,869.39 6,813.99 - 8,691.61 - 6,220.58 5,948,825.65 371,347.18 3.54 - 4,753.85 MWD +IFR- AK- CAZ -SC (3) 13,678.33 71.90 272.63 6,898.55 6,843.15 - 8,689.00 - 6,310.63 5,948,829.72 371,257.18 1.98 - 4,709.27 MW D+I FR-AK-CAZ-SC (3) 13,770.78 72.37 274.27 6,926.91 6,871.51 - 8,683.70 - 6,398.46 5,948,836.45 371,169.46 1.76 - 4,663.36 MWD +IFR- AK- CAZ -SC (3) 13,862.80 73.27 276.86 6,954.09 6,898.69 - 8,675.17 - 6,485.95 5,948,846.40 371,082.12 2.86 - 4,614.75 MWD +IFR- AK- CAZ -SC (3) 13,957.21 72.81 279.38 6,981.64 6,926.24 - 8,662.42 - 6,575.34 5,948,860.60 370,992.96 2.60 - 4,561.53 MWD +IFR- AK- CAZ -SC (3) 14,048.09 73.21 281.42 7,008.19 6,952.79 - 8,646.73 - 6,660.82 5,948,877.68 370,907.75 2.19 - 4,507.54 MWD +IFR- AK- CAZ -SC (3) 14,143.74 73.71 281.69 7,035.42 6,980.02 - 8,628.36 - 6,750.66 5,948,897.50 370,818.24 0.59 - 4,449.15 MWD +IFR- AK- CAZ -SC (3) 14,237.91 73.97 282.91 7,061.64 7,006.24 - 8,609.10 - 6,839.03 5,948,918.21 370,730.20 1.27 - 4,390.65 MWD +IFR- AK- CAZ -SC (3) 14,328.59 74.49 284.76 7,086.28 7,030.88 - 8,588.23 - 6,923.76 5,948,940.45 370,645.83 2.05 - 4,332.45 MWD +IFR- AK- CAZ -SC (3) 14,419.71 75.25 286.71 7,110.07 7,054.67 - 8,564.37 - 7,008.42 5,948,965.67 370,561.57 2.23 - 4,271.64 MWD +IFR- AK- CAZ -SC (3) 14,517.17 75.25 289.64 7,134.89 7,079.49 - 8,534.98 - 7,097.95 5,948,996.52 370,472.54 2.91 - 4,203.65 MWD +IFR- AK- CAZ -SC (3) 14,609.17 74.56 292.46 7,158.85 7,103.45 - 8,503.08 - 7,180.84 5,949,029.76 370,390.18 3.05 - 4,136.57 MWD +IFR- AK- CAZ -SC (3) 14,700.89 74.03 295.86 7,183.68 7,128.28 - 8,466.95 - 7,261.39 5,949,067.19 370,310.24 3.61 - 4,066.86 MWD +IFR- AK- CAZ -SC (3) 14,796.89 73.78 299.03 7,210.30 7,154.90 - 8,424.45 - 7,343.23 5,949,111.02 370,229.10 3.18 - 3,990.91 MWD +IFR- AK- CAZ -SC (3) 14,888.30 74.93 301.57 7,234.96 7,179.56 - 8,380.04 - 7,419.22 5,949,156.65 370,153.86 2.96 - 3,916.02 MWD +IFR- AK- CAZ -SC (3) 14,981.71 75.39 304.44 7,258.89 7,203.49 - 8,330.86 - 7,494.94 5,949,207.05 370,078.96 3.01 - 3,837.05 MWD +IFR- AK- CAZ -SC (3) 15,075.93 75.51 308.17 7,282.56 7,227.16 - 8,276.87 - 7,568.41 5,949,262.22 370,006.37 3.83 - 3,754.89 MWD +IFR- AK- CAZ -SC (3) 15,170.16 75.57 312.30 7,306.10 7,250.70 - 8,217.95 - 7,638.05 5,949,322.27 369,937.71 4.24 -3,670.17 MWD +IFR- AK- CAZ -SC (3) 15,262.35 76.02 316.40 7,328.74 7,273.34 - 8,155.49 - 7,701.94 5,949,385.75 369,874.85 4.34 - 3,585.02 MWD +IFR- AK- CAZ -SC (3) 15,351.63 76.03 317.52 7,350.30 7,294.90 - 8,092.17 - 7,761.07 5,949,450.02 369,816.76 1.22 - 3,501.35 MWD +IFR- AK- CAZ -SC (3) 15,446.99 75.95 317.35 7,373.38 7,317.98 - 8,024.02 - 7,823.66 5,949,519.17 369,755.30 0.19 - 3,411.80 MW D+ I FR-AK-CAZ-SC (3) 15,535.25 76.52 317.78 7,394.38 7,338.98 - 7,960.75 - 7,881.50 5,949,583.37 369,698.50 0.80 - 3,328.79 MW D+ I FR-AK-CAZ-SC (3) 15,632.06 78.17 319.76 7,415.59 7,360.19 - 7,889.72 - 7,943.75 5,949,655.40 369,637.42 2.62 - 3,236.84 MWD +IFR- AK- CAZ -SC (3) 15,725.29 79.50 321.93 7,433.65 7,378.25 - 7,818.79 - 8,001.49 5,949,727.25 369,580.84 2.69 - 3,147.11 MWD +IFR- AK- CAZ -SC (3) 15,818.07 82.37 324.03 7,448.27 7,392.87 - 7,745.65 - 8,056.64 5,949,801.27 369,526.89 3.82 - 3,056.64 MWD +IFR- AK- CAZ -SC (3) 15,911.89 82.81 326.48 7,460.37 7,404.97 - 7,669.21 - 8,109.66 5,949,878.56 369,475.13 2.63 - 2,964.25 MWD +IFR- AK- CAZ -SC (3) 16,015.00 82.81 326.48 7,473.27 7,417.87 - 7,583.92 - 8,166.15 5,949,964.75 369,420.03 0.00 - 2,862.43 PROJECTED to TD 11/10/2010 3 :15:02PM Page 6 COMPASS 2003.16 Build 69 • • ConocoPhillips (Alaska) Inc. Definitive Survey Report Company: ConocoPhillips(Alaska) Inc. Local Co- ordinate Reference: Well CD4 -25 Project: Western North Slope TVD Reference; . - - CD4 -25 (36.4 +19) @ 55.40ft (Doyon 19) Site: CD4 Nanuq Pad MD Reference: CD4 -25 (36.4 +19) @ 55.40ft (Doyon 19) We0: CD4 -25 North Reference: True Welibore: CD4 -25PB1 Survey Calculation Method: Minimum Curvature Design: CD4 -25PB1 Database: - - CPAI EDM Production -- ----- - -- - -- - -- - - - - - -- -- - - - - -- 11/10/2010 3.15:02PM Page 7 COMPASS 2003.16 Build 69 ConocoPhillips(Alaska) Inc. Western North Slope 5 v. CD4 Nanuq Pad CD4-25 50103206080000 ; Sperry Drilling Definitive Survey Report r-1,6 1 0 November, 2010 :f4.1 HALLIBURTON Sperry Drilling • • ConocoPhillips (Alaska) Inc. Definitive Survey Report Company: ConocoPhillips(Alaska) Inc. Local Co-ordinate Reference: _ Well CD4 -25 Project Western North Slope TVD Reference: CD4 -25 (36.4 +19) @ 55.40ft (Doyon 19) Site : - CD4 Nanuq Pad MD Reference: - CD4 -25 (36.4 +19) @ 55.40ft (Doyon 19) Well CD4 -25 North Reference: True Weilbore: . CD4 -25 Survey Calculation Method: Minimum Curvature Design : - - - CD4 -25 Database: . - CPAI EDM Production Project -- - Western North Slope Map System: US State Plane 1927 (Exact solution) System Datum: Mean Sea Level Geo Datum: NAD 1927 (NADCON CONUS) Using Well Reference Point Map Zone: Alaska Zone 04 Using geodetic scale factor Well _ CD4 -25 Well Position +N / -S 0.00 ft Northing: 5,957,414.20 ft Latitude: 70° 17' 31.791 N +E / -W 0.00 ft Easting: 377,707.79 ft Longitude: 150° 59' 24.316 W Position Uncertainty 0.00 ft Wellhead Elevation: ft Ground Level: 19.00ft Welibore CD4 D4 -25 Magnetics ' Model Name Sample Date Declination Dip Angle - . Field Strength (1 ( (1 MT) - BGGM2009 9/22/2010 20.94 80.69 57,632 Design CD4 -25 Audit Notes: Version: 1.0 Phase: ACTUAL Tie On Depth: 13,119.83 Vertical Section: - Depth From (TVD) - - - +N/-S +E/ -W - - Direction - - - - - . (ft) (ft) (if) (°) • . 36.40 0.00 0.00 332.00 Survey Program Date Froni . To - - (ft) Survey (Wellbore) Tool Name Description - Survey Date 82.00 915.00 CD4 -25 Gyro (CD4- 25PB1) GYD -GC -SS Gyrodata gyro single shots 9/10/2010 12:C 972.83 2,922.31 CD4 -25 (R100) (CD4- 25PB1) MWD +IFR- AK- CAZ -SC MWD +IFR AK CAZ SCC 9/10/2010 12 :C 2,990.17 13,119.83 CD4 -25 (R300) (CD4- 25PB1) MWD +IFR- AK- CAZ -SC MWD +IFR AK CAZ SCC 9/15/2010 12:C 13,205.00 13,214.48 CD4 -25 (R500) (CD4 -25) MWD +IFR- AK- CAZ -SC MWD +IFR AK CAZ SCC 9/26/2010 12:C 13,308.61 16,770.30 CD4 -25 (R600) (CD4 -25) MWD +IFR- AK- CAZ -SC MWD +IFR AK CAZ SCC 9/30/2010 12:C 16,821.31 21,102.53 CD4 -25 (R800) (CD4 -25) MWD +IFR- AK- CAZ -SC MWD +IFR AK CAZ SCC 10/18/2010 12'. Survey - Map Map Vertical MD Inc Azi TVD TVDSS +14-1/-S Northing Easting - OLS - Section (ft) ' (°)- (°) (ft) (ft) (ft) -. (ft) (ft) (ft) (°11001 - (ft) Survey Tool Name 36.40 0.00 0.00 36.40 -19.00 0.00 0.00 5,957,414.20 377,707.79 0.00 0.00 UNDEFINED 82.00 0.13 11.78 82.00 26.60 0.05 0.01 5,957,414.25 377,707.81 0.29 0.04 GYD -GC -SS (1) 174.00 0.15 12.08 174.00 118.60 0.27 0.06 5,957,414.47 377,707.86 0.02 0.21 GYD -GC -SS (1) 266.00 0.08 350.57 266.00 210.60 0.45 0.07 5,957,414.65 377,707.87 0.09 0.37 GYD -GC -SS (1) 358.00 0.76 209.09 358.00 302.60 -0.02 -0.24 5,957,414.19 377,707.56 0.90 0.09 GYD -GC -SS (1) I 451.00 1.66 201.79 450.98 395.58 -1.81 -1.04 5,957,412.41 377,706.73 0.98 -1.11 GYD -GC -SS (1) 543.00 2.56 199.16 542.91 487.51 -4.99 -2.20 5,957,409.25 377,705.51 0.98 -3.37 GYD -GC -SS (1) 636.00 4.60 206.74 635.73 580.33 -10.28 -4.56 5,957,404.00 377,703.06 2.25 -6.93 GYD -GC -SS (1) 728.00 7.83 211.61 727.17 671.77 -18.91 -9.51 5,957,395.45 377,697.98 3.55 -12.23 GYD- GC -SS(1) 820.00 11.88 214.30 817.80 762.40 -32.08 -18.13 5,957,382.42 377,689.14 4.43 -19.81 GYD -GC -SS (1) 11/10/2010 3:07 :32PM Page 2 COMPASS 2003.16 Build 69 • • ConocoPhillips (Alaska) Inc. Definitive Survey Report Company: ConocoPhillips(Alaska) Inc. Local Co - ordinate Reference: Well CD4 -25 Project: Western North Slope TVD Reference: - - _ CD4 -25 (36.4 +19) @ 55.40ft (Doyon 19) Site CD4 Nanuq Pad MD Reference: CD4 -25 (36.4 +19) @ 55.40ft (Doyon 19) Welk CD4 -25 North Reference: True Weilbore: CD4 -25 Survey Calculation Method: Minimum Curvature Design: CD4 -25 Database: CPAI EDM Production Survey Map Map - Vertical MD . Inc AZ, TVD TVDSS +N/-S +E! W Northing Easting BLS Section (ft) . (°) r (ft) (ft) (ft) (ft) (ft) (ft) (11001. (ft) Survey Tool Name 915.00 13.76 211.65 910.43 855.03 -49.78 -29.57 5,957,364.92 377,677.42 2.07 -30.07 GYD -GC -SS (1) 972.83 13.86 213.30 966.58 911.18 -61.42 -36.99 5,957,353.39 377,669.82 0.70 -36.87 MWD +IFR- AK- CAZ -SC (2) 1,067.06 15.25 212.48 1,057.79 1,002.39 -81.31 -49.84 5,957,333.72 377,656.64 1.49 -48.39 MWD +IFR- AK- CAZ -SC (2) 1,162.32 18.17 213.66 1,149.02 1,093.62 - 104.24 -64.80 5,957,311.03 377,641.31 3.09 -61.62 MWD +IFR- AK- CAZ -SC (2) 1,255.24 19.89 209.90 1,236.86 1,181.46 - 130.01 -80.71 5,957,285.53 377,624.98 2.27 -76.90 MWD +IFR- AK- CAZ -SC (2) 1,350.82 23.35 210.06 1,325.70 1,270.30 - 160.51 -98.31 5,957,255.33 377,606.89 3.62 -95.56 MWD +IFR- AK- CAZ -SC (2) 1,447.75 26.83 211.30 1,413.47 1,358.07 - 195.83 - 119.30 5,957,220.35 377,585.33 3.63 - 116.90 MWD +IFR- AK- CAZ -SC (2) 1,541.70 30.09 211.33 1,496.06 1,440.66 - 234.08 - 142.57 5,957,182.49 377,561.45 3.47 - 139.75 MWD +IFR- AK- CAZ -SC (2) 1,638.38 33.77 212.44 1,578.10 1,522.70 - 277.47 - 169.60 5,957,139.55 377,533.72 3.85 - 165.37 MWD +IFR- AK- CAZ -SC (2) 1,730.76 36.58 213.41 1,653.60 1,598.20 - 322.13 - 198.53 5,957,095.37 377,504.07 3.10 - 191.22 MWD +IFR- AK- CAZ -SC (2) 1,826.60 39.06 208.74 1,729.32 1,673.92 - 372.46 - 228.79 5,957,045.54 377,473.00 3.95 - 221.46 MWD +IFR- AK- CAZ -SC (2) 1,922.70 41.92 208.37 1,802.40 1,747.00 - 427.27 - 258.61 5,956,991.23 377,442.29 2.99 - 255.85 MWD +IFR- AK- CAZ -SC (2) 2,017.82 44.44 210.62 1,871.76 1,816.36 - 483.89 - 290.67 5,956,935.14 377,409.31 3.10 - 290.79 MWD +IFR- AK- CAZ -SC (2) 2,112.58 46.85 211.47 1,938.00 1,882.60 - 541.93 - 325.62 5,956,877.68 377,373.43 2.62 - 325.63 MWD +IFR- AK- CAZ -SC (2) 2,207.69 49.63 211.62 2,001.34 1,945.94 - 602.39 - 362.73 5,956,817.84 377,335.34 2.93 - 361.59 MW D+ I FR-AK-CAZ-SC (2) 2,302.58 53.69 213.01 2,060.19 2,004.79 - 665.26 - 402.53 5,956,755.63 377,294.53 4.43 - 398.41 MWD +IFR- AK- CAZ -SC (2) 2,395.42 56.49 212.83 2,113.32 2,057.92 - 729.16 - 443.90 5,956,692.41 377,252.13 3.02 - 435.41 MWD +IFR- AK- CAZ -SC (2) 2,492.72 59.59 212.78 2,164.81 2,109.41 - 798.54 - 488.62 5,956,623.78 377,206.29 3.19 - 475.68 MWD +IFR- AK- CAZ -SC (2) 2,588.07 60.72 210.16 2,212.27 2,156.87 - 869.08 - 531.78 5,956,553.96 377,161.99 2.66 - 517.69 MW D+ I FR-AK-CAZ-SC (2) 2,683.02 60.29 210.13 2,259.02 2,203.62 - 940.54 - 573.28 5,956,483.18 377,119.33 0.45 - 561.31 MWD +IFR- AK- CAZ -SC (2) 2,778.27 60.89 210.26 2,305.79 2,250.39 - 1,012.26 - 615.02 5,956,412.16 377,076.44 0.64 - 605.04 MWD +IFR- AK- CAZ -SC (2) 2,874.02 61.10 210.90 2,352.22 2,296.82 - 1,084.35 - 657.62 5,956,340.78 377,032.68 0.62 - 648.69 MWD +IFR- AK- CAZ -SC (2) 2,922.31 60.94 211.36 2,375.62 2,320.22 - 1,120.51 - 679.46 5,956,304.98 377,010.26 0.90 - 670.37 MWD +IFR- AK- CAZ -SC (2) 2,990.17 60.65 211.81 2,408.73 2,353.33 - 1,170.97 - 710.48 5,956,255.04 376,978.42 0.72 - 700.36 MWD +IFR- AK- CAZ -SC (3) 3,051.46 60.83 211.52 2,438.68 2,383.28 - 1,216.48 - 738.55 5,956,209.99 376,949.61 0.51 - 727.36 MWD +IFR- AK- CAZ -SC (3) 3,146.67 61.19 211.83 2,484.83 2,429.43 - 1,287.36 - 782.28 5,956,139.85 376,904.74 0.47 - 769.41 MWD +IFR- AK- CAZ -SC (3) 3,241.60 61.06 211.53 2,530.67 2,475.27 - 1,358.10 - 825.94 5,956,069.83 376,859.94 0.31 - 811.37 MWD +IFR- AK- CAZ -SC (3) 3,336.80 61.13 211.49 2,576.69 2,521.29 - 1,429.15 - 869.50 5,955,999.50 376,815.24 0.08 - 853.66 MWD +IFR- AK- CAZ -SC (3) 3,431.71 61.25 211.39 2,622.42 2,567.02 - 1,500.10 - 912.87 5,955,929.27 376,770.72 0.16 - 895.94 MWD +IFR- AK- CAZ -SC (3) 3,526.55 61.20 211.12 2,668.08 2,612.68 - 1,571.17 - 956.00 5,955,858.92 376,726.44 0.26 - 938.44 MWD +IFR- AK- CAZ -SC (3) 3,620.96 61.40 210.72 2,713.41 2,658.01 - 1,642.21 - 998.56 5,955,788.59 376,682.74 0.43 - 981.19 MW D+ I FR-AK-CAZ-SC (3) 3,712.85 61.47 210.96 2,757.35 2,701.95 - 1,711.50 - 1,039.93 5,955,719.98 376,640.25 0.24 - 1,022.95 MWD +IFR- AK- CAZ -SC (3) 3,810.40 61.19 210.25 2,804.15 2,748.75 - 1,785.17 - 1,083.50 5,955,647.04 376,595.48 0.70 - 1,067.54 MWD +IFR- AK- CAZ -SC (3) 3,906.22 61.21 209.92 2,850.32 2,794.92 - 1,857.82 - 1,125.60 5,955,575.09 376,552.22 0.30 - 1,111.93 MW D+I FR-AK-CAZ-SC (3) 4,000.93 60.77 210.17 2,896.25 2,840.85 - 1,929.52 - 1,167.07 5,955,504.08 376,509.59 0.52 - 1,155.76 MWD +IFR- AK- CAZ -SC (3) 4,092.44 60.70 209.63 2,940.98 2,885.58 - 1,998.73 - 1,206.86 5,955,435.54 376,468.68 0.52 - 1,198.18 MW D+ I FR-AK-CAZ-SC (3) 4,188.34 60.64 209.71 2,987.96 2,932.56 - 2,071.37 - 1,248.25 5,955,363.58 376,426.12 0.10 - 1,242.90 MWD +IFR- AK- CAZ -SC (3) 4,284.16 60.92 210.03 3,034.73 2,979.33 - 2,143.89 - 1,289.89 5,955,291.76 376,383.30 0.41 - 1,287.37 MWD +IFR- AK- CAZ -SC (3) 4,378.53 61.14 210.34 3,080.44 3,025.04 - 2,215.25 - 1,331.41 5,955,221.08 376,340.64 0.37 - 1,330.90 MWD +IFR- AK- CAZ -SC (3) 4,474.91 61.01 210.86 3,127.06 3,071.66 - 2,287.86 - 1,374.35 5,955,149.18 376,296.53 0.49 - 1,374.85 MWD +IFR- AK- CAZ -SC (3) 11/10/2010 3:07:32PM Page 3 COMPASS 2003.16 Build 69 • • ConocoPhillips (Alaska) Inc. Definitive Survey Report Company: ConocoPhillips(Alaska) Inc. Local Co- ordinate Reference: Well CD4 -25 Project: - Western North Slope NB Reference: CD4 -25 (36.4 +19) @ 55.40ft (Doyon 19) Site CD4 Nanuq Pad MD Reference: CD4 -25 (36.4 +19) @ 55.40ft (Doyon 19) Well: CD4 -25 Worth Reference: True Wellbore: CD4 -25 Survey Calculation Method: Minimum Curvature Design:,- CD4 -25 Database: • CPAI EDM Production Survey Map Map Vertical MD Inc -- Azi TVO TVDSS +N/-S +EJ-W Northing fasting DLS Section - • - (ft) ( °_j ( °j = (ft) (ft) (ft) (ft) (ft) (ft) ( °f100') (ft) Survey Tool Name 4,571.70 61.18 210.63 3,173.84 3,118.44 - 2,360.69 - 1,417.66 5,955,077.08 376,252.04 0.27 - 1,418.81 MWD +IFR- AK- CAZ -SC (3) 4,666.33 61.01 210.51 3,219.58 3,164.18 - 2,432.01 - 1,459.80 5,955,006.46 376,208.75 0.21 - 1,462.01 MW D+ I FR-AK-CAZ-SC (3) 4,761.64 60.98 210.63 3,265.80 3,210.40 - 2,503.78 - 1,502.19 5,954,935.39 376,165.20 0.11 - 1,505.48 MWD +IFR- AK- CAZ -SC (3) 4,853.97 60.78 210.90 3,310.73 3,255.33 - 2,573.09 - 1,543.45 5,954,866.77 376,122.82 0.33 - 1,547.30 MWD +IFR- AK- CAZ -SC (3) 4,951.09 60.86 211.36 3,358.08 3,302.68 - 2,645.68 - 1,587.29 5,954,794.91 376,077.81 0.42 - 1,590.81 MWD +IFR- AK- CAZ -SC (3) 5,044.90 60.70 211.96 3,403.87 3,348.47 - 2,715.36 - 1,630.26 5,954,725.94 376,033.72 0.58 - 1,632.16 MWD +IFR- AK- CAZ -SC (3) 5,141.80 60.76 211.90 3,451.25 3,395.85 - 2,787.10 - 1,674.96 5,954,654.94 375,987.85 0.08 - 1,674.52 MWD+ I FR-AK-CAZ-SC (3) 5,236.70 60.98 212.05 3,497.45 3,442.05 - 2,857.42 - 1,718.86 5,954,585.35 375,942.82 0.27 - 1,716.00 MWD +IFR- AK- CAZ -SC (3) 5,330.75 60.91 212.33 3,543.12 3,487.72 - 2,927.00 - 1,762.66 5,954,516.50 375,897.90 0.27 - 1,756.87 MWD +IFR- AK- CAZ -SC (3) 5,427.56 61.12 211.99 3,590.04 3,534.64 - 2,998.69 - 1,807.74 5,954,445.56 375,851.67 0.38 - 1,799.01 MWD +IFR- AK- CAZ -SC (3) 5,521.17 61.47 211.07 3,635.00 3,579.60 - 3,068.67 - 1,850.67 5,954 ,376 .29 375,807.61 0.94 - 1,840.64 MW D+ I FR-AK-CAZ-SC (3) 5,616.72 61.12 209.89 3,680.89 3,625.49 - 3,140.90 - 1,893.18 5,954,304.77 375,763.93 1.14 - 1,884.45 MWD +IFR- AK- CAZ -SC (3) 5,712.40 61.11 210.03 3,727.11 3,671.71 - 3,213.48 - 1,935.02 5,954,232.89 375,720.92 0.13 - 1,928.90 MW D+I FR-AK-CAZ-SC (3) 5,807.30 60.67 209.88 3,773.28 3,717.88 - 3,285.32 - 1,976.42 5,954,161.74 375,678.36 0.48 - 1,972.89 MW D+I FR-AK-CAZ-SC (3) 5,901.99 60.72 209.87 3,819.62 3,764.22 - 3,356.92 - 2,017.55 5,954,090.83 375,636.07 0.05 - 2,016.80 MWD +IFR- AK- CAZ -SC (3) 5,992.66 60.85 209.81 3,863.88 3,808.48 - 3,425.56 - 2,056.92 5,954,022.84 375,595.59 0.15 - 2,058.92 MWD +IFR- AK- CAZ -SC (3) 6,091.94 60.90 209.86 3,912.20 3,856.80 - 3,500.79 - 2,100.07 5,953,948.32 375,551.23 0.07 - 2,105.09 MW D+ I FR-AK-CAZ-SC (3) 6,186.63 60.99 210.09 3,958.19 3,902.79 - 3,572.49 - 2,141.43 5,953,877.31 375,508.72 0.23 - 2,148.99 MWD +IFR- AK- CAZ -SC (3) 6,282.15 61.19 209.83 4,004.36 3,948.96 - 3,644.94 - 2,183.18 5,953,805.56 375,465.79 0.32 - 2,193.34 MWD +IFR- AK- CAZ -SC (3) 6,377.84 61.74 210.26 4,050.07 3,994.67 - 3,717.71 - 2,225.28 5,953,733.49 375,422.52 0.70 - 2,237.84 MWD +IFR- AK- CAZ -SC (3) 6,471.99 63.22 210.78 4,093.58 4,038.18 - 3,789.63 - 2,267.68 5,953,662.27 375,378.96 1.65 - 2,281.43 MW D+ I FR-AK-CAZ-SC (3) 6,567.37 64.25 211.62 4,135.78 4,080.38 - 3,862.79 - 2,311.99 5,953,589.85 375,333.47 1.34 - 2,325.23 MW D+ I FR-AK-CAZ-SC (3) 6,662.97 65.06 212.04 4,176.71 4,121.31 - 3,936.19 - 2,357.56 5,953,517.20 375,286.72 0.94 - 2,368.65 MW D+ I FR-AK-CAZ-SC (3) 6,753.45 65.88 212.11 4,214.27 4,158.87 - 4,005.94 - 2,401.27 5,953,448.18 375,241.88 0.91 - 2,409.71 MWD +IFR- AK- CAZ -SC (3) 6,854.09 66.90 212.28 4,254.58 4,199.18 - 4,083.98 - 2,450.40 5,953,370.96 375,191.49 1.03 - 2,455.54 MWD +IFR- AK- CAZ -SC (3) 6,949.59 67.23 212.29 4,291.79 4,236.39 - 4,158.33 - 2,497.38 5,953,297.39 375,143.31 0.35 - 2,499.14 MWD +IFR- AK- CAZ -SC (3) 7,044.44 67.03 211.59 4,328.66 4,273.26 - 4,232.49 - 2,543.61 5,953,224.00 375,095.88 0.71 - 2,542.92 MWD +IFR- AK- CAZ -SC (3) 7,138.04 66.76 211.77 4,365.39 4,309.99 - 4,305.76 - 2,588.82 5,953,151.48 375,049.49 0.34 - 2,586.38 MWD +IFR- AK- CAZ -SC (3) 7,233.68 66.76 211.03 4,403.12 4,347.72 - 4,380.76 - 2,634.61 5,953,077.23 375,002.49 0.71 - 2,631.11 MWD +IFR- AK- CAZ -SC (3) 7,328.95 66.69 210.66 4,440.77 4,385.37 - 4,455.90 - 2,679.48 5,953,002.84 374,956.41 0.36 - 2,676.39 MWD +IFR- AK- CAZ -SC (3) 7,423.98 67.03 210.50 4,478.12 4,422.72 - 4,531.13 - 2,723.94 5,952,928.35 374,910.74 0.39 - 2,721.94 MWD +IFR- AK- CAZ -SC (3) 7,519.01 66.90 210.58 4,515.30 4,459.90 - 4,606.45 - 2,768.37 5,952,853.77 374,865.09 0.16 - 2,767.58 MWD +IFR- AK- CAZ -SC (3) 7,613.92 66.97 210.17 4,552.48 4,497.08 - 4,681.79 - 2,812.53 5,952,779.17 374,819.71 0.40 - 2,813.37 MWD +IFR- AK- CAZ -SC (3) 7,707.60 67.29 210.39 4,588.89 4,533.49 - 4,756.33 - 2,856.05 5,952,705.35 374,774.99 0.40 - 2,858.76 MWD +IFR- AK- CAZ -SC (3) 7,803.30 66.96 210.60 4,626.09 4,570.69 - 4,832.31 - 2,900.80 5,952,630.12 374,729.02 0.40 - 2,904.83 MWD +IFR- AK- CAZ -SC (3) 7,899.11 67.17 210.27 4,663.43 4,608.03 - 4,908.38 - 2,945.49 5,952,554.79 374,683.09 0.39 - 2,951.02 MWD +IFR- AK- CAZ -SC (3) 7,994.44 66.89 210.13 4,700.63 4,645.23 - 4,984.24 - 2,989.64 5,952,479.66 374,637.72 0.32 - 2,997.27 MWD +1 FR- AK- CAZ -SC (3) 8,084.20 66.95 210.43 4,735.82 4,680.42 - 5,055.55 - 3,031.28 5,952,409.04 374,594.93 0.31 - 3,040.69 MWD +IFR- AK- CAZ -SC (3) 8,179.20 67.03 210.89 4,772.95 4,717.55 - 5,130.77 - 3,075.87 5,952,334.57 374,549.13 0.45 - 3,086.17 MWD +IFR- AK- CAZ -SC (3) 8,279.52 66.89 211.27 4,812.22 4,756.82 - 5,209.84 - 3,123.53 5,952,256.30 374,500.19 0.38 - 3,133.60 MWD +IFR- AK- CAZ -SC (3) 11710/2010 3:07:32PM Page 4 COMPASS 2003.16 Build 69 • ConocoPhillips (Alaska) Inc. Definitive Survey Report Company: ConocoPhillips(Alaska) Inc. Local Co - ordinate Reference: Well CD4 -25 Project: Western North Slope ND Reference: CD4 -25 (36.4 +19) @ 55.40ft (Doyon 19) Site: CD4 Nanuq Pad MD Reference: CD4 -25 (36.4 +19) @ 55.40ft (Doyon 19) Well: .. CD4 -25 North Reference: True Weltbore: CD4 -25 Survey Calculation Method: - Minimum Curvature Design: • CD4 -25 Database: CPAI EDM Production survey Map- Map Vertical MD Inc Ail TVD TVDSS +N/-S +E/ W Northing Easting DLS Section • {ft) . { ") { j (ft) (ft) (f() (ft) (ft) (ft) r /1001 . (ft) Survey Tool Name 8,374.74 66.97 211.94 4,849.53 4,794.13 - 5,284.45 - 3,169.44 5,952,182.45 374,453.08 0.65 - 3,177.93 MWD +IFR- AK- CAZ -SC (3) 8,465.41 67.16 211.93 4,884.86 4,829.46 - 5,355.31 - 3,213.61 5,952,112.32 374,407.77 0.21 - 3,219.76 MWD +IFR- AK- CAZ -SC (3) 8,565.15 67.42 211.41 4,923.37 4,867.97 - 5,433.62 - 3,261.91 5,952,034.81 374,358.20 0.55 - 3,266.22 MWD +IFR- AK- CAZ -SC (3) 8,655.83 67.37 211.28 4,958.22 4,902.82 - 5,505.11 - 3,305.46 5,951,964.04 374,313.50 0.14 - 3,308.91 MWD +IFR- AK- CAZ -SC (3) 8,753.41 67.44 210.75 4,995.71 4,940.31 - 5,582.32 - 3,351.88 5,951,887.60 374,265.83 0.51 - 3,355.29 MWD +IFR- AK- CAZ -SC (3) 8,846.85 67.35 210.91 5,031.63 4,976.23 - 5,656.39 - 3,396.09 5,951,814.27 374,220.43 0.19 - 3,399.93 MWD +IFR- AK- CAZ -SC (3) 8,944.62 66.77 211.12 5,069.74 5,014.34 - 5,733.56 - 3,442.48 5,951,737.87 374,172.79 0.63 -3,446.29 MWD +IFR- AK- CAZ -SC (3) 9,037.17 66.76 211.27 5,106.25 5,050.85 - 5,806.31 - 3,486.53 5,951,665.86 374,127.57 0.15 -3,489.84 MWD +IFR- AK- CAZ -SC (3) 9,134.11 66.82 210.91 5,144.45 5,089.05 - 5,882.60 - 3,532.54 5,951,590.33 374,080.33 0.35 -3,535.60 MWD +IFR- AK- CAZ -SC (3) 9,228.35 66.89 211.09 5,181.50 5,126.10 - 5,956.88 - 3,577.17 5,951,516.79 374,034.50 0.19 - 3,580.23 MWD +IFR- AK- CAZ -SC (3) 9,324.06 66.89 210.72 5,219.06 5,163.66 - 6,032.41 - 3,622.38 5,951,442.01 373,988.07 0.36 - 3,625.70 MWD +IFR- AK- CAZ -SC (3) 9,415.72 67.03 211.16 5,254.94 5,199.54 - 6,104.76 - 3,665.75 5,951,370.39 373,943.53 0.47 - 3,66922 MWD +IFR- AK- CAZ -SC (3) 9,514.52 67.10 211.55 5,293.44 5,238.04 - 6,182.46 - 3,713.09 5,951,293.47 373,894.93 0.37 - 3,715.60 MWD +IFR- AK- CAZ -SC (3) 9,608.74 67.04 211.16 5,330.15 5,274.75 - 6256.56 - 3,758.24 5,951,220.12 373,848.59 0.39 - 3,759.83 MWD +IFR- AK- CAZ -SC (3) 9,704.99 66.69 211.16 5,367.96 5,312.56 - 6,332.30 - 3,804.04 5,951,145.14 373,801.57 0.36 - 3,805.20 MWD +IFR- AK- CAZ -SC (3) 9,799.67 66.50 211.36 5,405.57 5,350.17 - 6,406.58 - 3,849.13 5,951,071.62 373,755.28 0.28 - 3,849.61 MWD +IFR- AK- CAZ -SC (3) 9,895.11 66.82 211.17 5,443.38 5,387.98 - 6,481.48 - 3,894.61 5,950,997.47 373,708.59 0.38 - 3,894.40 MWD +IFR- AK- CAZ -SC (3) 9,988.98 67.02 211.46 5,480.18 5,424.78 - 6,555.26 - 3,939.49 5,950,924.44 373,662.52 0.36 - 3,938.47 MWD +IFR- AK- CAZ -SC (3) 10,085.17 67.29 211.73 5,517.53 5,462.13 - 6,630.76 - 3,985.94 5,950,849.70 373,614.86 0.38 - 3,983.33 MWD +IFR- AK- CAZ -SC (3) 10,179.76 67.10 211.30 5,554.19 5,498.79 - 6,705.09 - 4,031.51 5,950,776.13 373,568.08 0.46 - 4,027.57 MWD +IFR- AK- CAZ -SC (3) 10,274.95 66.89 210.94 5,591.39 5,535.99 - 6,780.10 - 4,076.80 5,950,701.87 373,521.58 0.41 - 4,072.54 MWD +IFR- AK- CAZ -SC (3) 10,370.08 67.16 211.24 5,628.52 5,573.12 - 6,855.11 - 4,122.03 5,950,627.62 373,475.15 0.41 - 4,117.53 MWD +IFR- AK- CAZ -SC (3) 10,463.04 66.91 210.94 5,664.79 5,609.39 - 6,928.40 - 4,166.23 5,950,555.06 373,429.77 0.40 - 4,161.49 MWD +IFR- AK- CAZ -SC (3) 10,560.30 66.89 210.39 5,702.95 5,647.55 - 7,005.36 - 4,211.85 5,950,478.86 373,382.90 0.52 - 4,208.02 MWD +IFR- AK- CAZ -SC (3) 10,653.92 67.24 210.21 5,739.43 5,684.03 - 7,079.80 - 4,255.35 5,950,405.15 373,338.20 0.41 - 4,253.32 MWD +IFR- AK- CAZ -SC (3) 10,744.64 67.15 209.69 5,774.60 5,719.20 - 7,152.26 - 4,297.10 5,950,333.38 373,295.27 0.54 -4,297.70 MWD +IFR- AK- CAZ -SC (3) 10,845.49 66.96 209.45 5,813.91 5,758.51 - 7,233.03 - 4,342.93 5,950,253.37 373,248.14 0.29 - 4,347.50 MWD +IFR- AK- CAZ -SC (3) 10,940.10 66.74 210.08 5,851.11 5,795.71 - 7,308.55 - 4,386.12 5,950,178.57 373,203.74 0.65 - 4,393.91 MWD +IFR- AK- CAZ -SC (3) 11,034.70 66.89 209.99 5,888.35 5,832.95 - 7,383.83 - 4,429.65 5,950,104.02 373,158.99 0.18 - 4,439.94 MWD +IFR- AK- CAZ -SC (3) 11,130.47 67.70 210.78 5,925.32 5,869.92 - 7,460.04 - 4,474.33 5,950,028.55 373,113.08 1.14 - 4,486.25 MWD +IFR- AK- CAZ -SC (3) 11,223.45 67.03 212.09 5,961.10 5,905.70 - 7,533.26 - 4,519.09 5,949,956.07 373,067.14 1.49 - 4,529.89 MWD +IFR- AK- CAZ -SC (3) 11,320.12 66.74 212.82 5,999.06 5,943.66 - 7,608.28 - 4,566.80 5,949,881.84 373,018.22 0.76 - 4,573.73 MWD +IFR- AK- CAZ -SC (3) 11,415.33 66.89 212.66 6,036.54 5,981.14 - 7,681.90 - 4,614.13 5,949,809.01 372,969.70 0.22 - 4,616.51 MWD +IFR- AK- CAZ -SC (3) 11,506.49 67.23 212.59 6,072.07 6,016.67 - 7,752.61 - 4,659.39 5,949,739.06 372,923.30 0.38 - 4,657.69 MWD +IFR- AK- CAZ -SC (3) 11,606.93 66.70 212.80 6,111.37 6,055.97 - 7,830.39 - 4,709.32 5,949,662.10 372,872.12 0.56 - 4,702.93 MWD +IFR- AK- CAZ -SC (3) 11,695.73 66.09 213.46 6,146.93 6,091.53 - 7,898.53 - 4,753.79 5,949,594.70 372,826.55 0.97 - 4,742.22 MWD +IFR- AK- CAZ -SC (3) 11,794.67 66.24 216.53 6,186.92 6,131.52 - 7,972.66 - 4,805.69 5,949,521.43 372,773.46 2.84 - 4,783.31 MWD +IFR- AK- CAZ -SC (3) 11,890.19 66.56 219.14 6,225.17 6,169.77 - 8,041.78 - 4,859.37 5,949,453.20 372,718.66 2.53 - 4,819.13 MWD +IFR- AK- CAZ -SC (3) 11,983.92 66.69 221.06 6,262.36 6,206.96 - 8,107.59 - 4,914.79 5,949,388.30 372,662.18 1.89 - 4,851.22 MWD +IFR- AK- CAZ -SC (3) 12,080.18 66.56 224.11 6,300.56 6,245.16 - 8,172.64 - 4,974.57 5,949,324.24 372,601.36 2.91 - 4,880.59 MWD +IFR- AK- CAZ -SC (3) 1 1/10/2010 3:07:32PM Page 5 COMPASS 2003.16 Build 69 • • ConocoPhillips (Alaska) Inc. Definitive Survey Report Corttpany: ConocoPhillips(Alaska) Inc. Local Co- ordinate Reference: - Well CD4 -25 Project: Western North Slope TVD Reference: CD4 -25 (36.4 +19) @ 55.40ft (Doyon 19) Site. CD4 Nanuq Pad MD Reference: CD4 -25 (36.4 +19) @ 55.40ft (Doyon 19) Welt: CD4 -25 North Reference: True • Wellbore: • CD4 -25 Survey Calculatio n Method; Minimum Curvature Design :, CD4 -25 Database: CPAI EDM Production Survey Map Map Vertical - -MD ine Azi TVD TVDSS +N/-S +E/ Northing Easting DLS Section (ft) ( ° ( °) (ft) (ft) (ft) (ft) (ft) (ft) - moo _ (ft) Survey Tool Name 12,173.37 65.95 22628 6,338.08 6,282.68 - 8,232.74 - 5,035.08 5,949,265.13 372,539.88 2.23 - 4,905.25 MWD +IFR- AK- CAZ -SC (3) 12,270.50 65.67 228.09 6,377.89 6,322.49 - 8,292.96 - 5,100.07 5,949,205.99 372,473.92 1.72 - 4,927.91 MWD +IFR- AK- CAZ -SC (3) 12,362.78 65.61 230.82 6,415.96 6,360.56 - 8,347.60 - 5,163.94 5,949,152.40 372,409.18 2.70 - 4,946.17 MWD +IFR- AK- CAZ -SC (3) 12,458.55 66.16 234.39 6,455.09 6,399.69 - 8,400.67 - 5,233.38 5,949,100.47 372,338.89 3.45 - 4,960.43 MWD +IFR- AK- CAZ -SC (3) 12,554.15 66.44 238.65 6,493.54 6,438.14 - 8,448.94 - 5,306.37 5,949,053.40 372,265.13 4.09 - 4,968.78 MWD +IFR- AK- CAZ -SC (3) 12,650.64 66.15 242.36 6,532.34 6,476.94 - 8,492.43 - 5,383.25 5,949,011.17 372,187.56 3.53 - 4,971.09 MW D+I FR-AK-CAZ-SC (3) 12,745.61 66.23 245.51 6,570.69 6,515.29 - 8,530.60 - 5,461.29 5,948,974.27 372,108.92 3.04 - 4,968.15 MWD +IFR- AK- CAZ -SC (3) 12,839.03 67.16 248.04 6,607.65 6,552.25 - 8,564.42 - 5,540.13 5,948,941.74 372,029.55 2.68 - 4,961.01 MW D+ I FR-AK-CAZ-SC (3) 12,928.63 67.69 250.45 6,642.05 6,586.65 - 8,593.74 - 5,617.49 5,948,913.69 371,951.73 2.55 - 4,950.57 MW D+ I FR-AK-CAZ-SC (3) 13,027.02 68.09 253.53 6,679.09 6,623.69 - 8,621.91 - 5,704.16 5,948,886.93 371,864.61 2.93 - 4,934.76 MWD +IFR- AK- CAZ -SC (3) 13,119.83 68.23 256.78 6,713.63 6,658.23 - 8,643.98 - 5,787.42 5,948,866.22 371,781.01 3.25 - 4,915.15 MWD+ I FR-AK-CAZ-SC (3) 13,205.00 68.30 258.42 6,745.17 6,689.77 - 8,660.97 - 5,864.69 5,948,850.50 371,703.49 1.79 - 4,893.88 MW D+ I FR-AK-CAZ-SC (4) 13,214.48 68.31 258.60 6,748.67 6,693.27 - 8,662.72 - 5,873.32 5,948,848.88 371,694.83 1.77 - 4,891.37 MWD +IFR- AK- CAZ -SC (4) 13,308.61 66.17 259.29 6,785.09 6,729.69 - 8,679.37 - 5,958.50 5,948,833.62 371,609.39 2.37 - 4,866.08 MW D+I FR-AK-CAZ-SC (5) 13,400.70 65.82 258.14 6,822.55 6,767.15 - 8,695.83 - 6,041.00 5,948,818.51 371,526.64 1.20 - 4,841.88 MW D+I FR-AK-CAZ-SC (5) 13,493.18 65.69 257.90 6,860.53 6,805.13 - 8,713.33 - 6,123.49 5,948,802.35 371,443.89 0.28 - 4,818.61 MW D+ I FR-AK-CAZ-SC (5) 13,586.54 66.76 257.97 6,898.16 6,842.76 - 8,731.19 - 6,207.03 5,948,785.86 371,360.07 1.15 - 4,795.16 MWD +IFR- AK- CAZ -SC (5) 13,679.45 68.97 259.55 6,933.17 6,877.77 - 8,747.95 - 6,291.44 5,948,770.47 371,275.41 2.85 - 4,770.33 MWD +IFR- AK- CAZ -SC (5) 13,769.54 71.00 261.53 6,964.01 6,908.61 - 8,761.86 - 6,374.93 5,948,757.93 371,191.71 3.06 - 4,743.41 MWD +IFR- AK- CAZ -SC (5) 13,865.92 71.19 265.02 6,995.24 6,939.84 - 8,772.53 - 6,465.47 5,948,748.73 371,101.02 3.43 - 4,710.33 MW D+ I FR-AK-CAZ-SC (5) 13,959.42 72.17 268.44 7,024.64 6,969.24 - 8,777.59 - 6,554.07 5,948,745.12 371,012.36 3.63 - 4,673.20 MW0+1 FR- AK- CAZ -SC (5) 14,051.63 73.41 271.55 7,051.93 6,996.53 - 8,777.59 - 6,642.13 5,948,746.55 370,924.31 3.49 - 4,631.86 MWD +IFR- AK- CAZ -SC (5) 14,145.03 73.15 275.02 7,078.81 7,023.41 - 8,772.46 - 6,731.42 5,948,753.12 370,835.13 3.57 - 4,585.41 MWD +IFR- AK- CAZ -SC (5) 14,239.33 72.88 278.53 7,106.36 7,050.96 - 8,761.83 - 6,820.96 5,948,765.21 370,745.78 3.57 - 4,533.99 MWD +IFR- AK- CAZ -SC (5) 14,331.59 72.56 280.33 7,133.77 7,078.37 - 8,747.39 - 6,907.86 5,948,781.06 370,659.13 1.89 - 4,480.45 MW D+ I FR-AK-CAZ-SC (5) 14,424.34 73.14 283.07 7,161.12 7,105.72 - 8,729.42 - 6,994.64 5,948,800.44 370,572.67 2.89 - 4,423.84 MWD +IFR- AK- CAZ -SC (5) 14,517.81 73.54 286.49 7,187.93 7,132.53 - 8,706.58 - 7,081.20 5,948,824.68 370,486.49 3.53 - 4,363.03 MWD +IFR- AK- CAZ -SC (5) 14,610.79 73.41 290.95 7,214.39 7,158.99 - 8,677.98 - 7,165.60 5,948,854.65 370,402.57 4.60 - 4,298.15 MWD +IFR- AK- CAZ -SC (5) 14,702.29 73.65 294.48 7,240.34 7,184.94 - 8,644.10 - 7,246.53 5,948,889.84 370,322.22 3.71 - 4,230.25 MWD +IFR- AK- CAZ -SC (5) 14,796.65 74.94 298.49 7,265.89 7,210.49 - 8,603.59 - 7,327.81 5,948,931.66 370,241.61 4.31 - 4,156.32 MWD +1 FR- AK- CAZ -SC (5) 14,889.82 76.91 302.02 7,288.55 7,233.15 - 8,558.06 - 7,405.85 5,948,978.45 370,164.33 4.24 - 4,079.48 MWD +IFR- AK- CAZ -SC (5) 14,983.43 78.75 305.08 7,308.29 7,252.89 - 8,507.49 - 7,482.09 5,949,030.25 370,088.93 3.75 - 3,999.04 MWD +IFR- AK- CAZ -SC (5) 15,077.15 80.19 307.00 7,325.42 7,270.02 - 8,453.28 - 7,556.59 5,949,085.66 370,015.33 2.53 - 3,916.20 MWD +IFR- AK- CAZ -SC (5) 15,170.22 81.94 307.86 7,339.87 7,284.47 - 8,397.40 - 7,629.59 5,949,142.72 369,943.25 2.09 - 3,832.58 MWD +IFR- AK- CAZ -SC (5) 15,262.75 83.87 308.10 7,351.30 7,295.90 - 8,340.89 - 7,701.97 5,949,200.39 369,871.81 2.10 - 3,748.72 MW D+ I FR-AK-CAZ-SC (5) 15,356.57 83.99 310.43 7,361.22 7,305.82 - 8,281.85 - 7,774.19 5,949,260.59 369,800.56 2.47 - 3,662.68 MWD +IFR- AK- CAZ -SC (5) 15,446.93 83.69 312.33 7,370.92 7,315.52 - 8,222.47 - 7,841.60 5,949,321.06 369,734.13 2.12 - 3,578.60 MWD +IFR- AK- CAZ -SC (5) 15,538.69 83.56 314.03 7,381.11 7,325.71 - 8,160.07 - 7,908.09 5,949,384.53 369,668.67 1.85 - 3,492.29 MW D+ I FR-AK-CAZ-SC (5) 15,631.53 83.62 315.10 7,391.47 7,336.07 - 8,095.33 - 7,973.82 5,949,450.32 369,604.00 1.15 - 3,404.27 MWD+ I FR-AK-CAZ-SC (5) 15,724.55 83.56 317.01 7,401.86 7,346.46 - 8,028.78 - 8,037.97 5,949,517.90 369,540.95 2.04 - 3,315.39 MWD +IFR- AK- CAZ -SC (5) 11/10/2010 3:07:32PM Page 6 COMPASS 2003.16 Build 69 • • ConocoPhillips (Alaska) Inc. Definitive Survey Report Company :. ConocoPhillips(Alaska) Inc. Local Co- ordinate Reference: - Well CD4 - 25 Project: Western North Slope TVD Reference: CD4-25 (36.4 +19) @ 55.40ft (Doyon 19) Slte: CD4 Nanuq Pad MD Reference: CD4 -25 (36.4 +19) @ 55.40ft (Doyon 19) Well: - CD4 -25 North Reference: True WeNbore: CD4 -25 Survey Calculation Method: Minimum Curvature Design: CD4 -25 Database: - CPAI EDM Production ,Survey Map Map Vertical MD Inc Azi TVD . TVDSS i-N /-S + El W Northing r Eastin g Dt_S Section (ft) .. - ( ) ( °) (ft) (fk) (ft) (ft) (ft) (ft) ( °f100'y (ft) Survey Tool Name - 15,812.86 83.50 320.08 7,411.81 7,356.41 - 7,963.02 - 8,096.06 5,949,584.59 369,483.95 3.45 - 3,230.06 MWD +IFR- AK- CAZ -SC (5) 15,912.02 83.50 322.76 7,423.04 7,367.64 - 7,886.01 - 8,157.49 5,949,662.58 369,423.78 2.69 - 3,133.22 MWD +IFR- AK- CAZ -SC (5) 16,003.10 83.62 325.21 7,433.26 7,377.86 - 7,812.81 - 8,210.70 5,949,736.64 369,371.77 2.68 - 3,043.61 MWD +IFR- AK- CAZ -SC (5) 16,097.67 83.19 326.94 7,444.12 7,388.72 - 7,734.86 - 8,263.13 5,949,815.42 369,320.62 1.87 - 2,950.17 MWD +IFR- AK- CAZ -SC (5) 16,192.58 83.25 328.98 7,455.33 7,399.93 - 7,654.97 - 8,313.13 5,949,896.10 369,271.94 2.14 - 2,856.16 MWD +IFR- AK- CAZ -SC (5) 16,283.84 83.25 330.96 7,466.05 7,410.65 - 7,576.51 - 8,358.48 5,949,975.28 369,227.87 2.15 - 2,765.60 MWD +IFR- AK- CAZ -SC (5) 16,377.12 82.94 333.35 7,477.27 7,421.87 - 7,494.64 - 8,401.73 5,950,057.84 369,185.96 2.57 - 2,673.00 MWD +IFR- AK- CAZ -SC (5) 16,470.76 83.19 333.81 7,488.58 7,433.18 - 7,411.39 - 8,443.09 5,950,141.74 369,145.97 0.56 - 2,580.08 MWD +IFR- AK- CAZ -SC (5) 16,563.57 82.62 333.14 7,500.04 7,444.64 - 7,328.99 - 8,484.22 5,950,224.80 369,106.18 0.94 - 2,488.01 MWD +IFR- AK- CAZ -SC (5) 16,656.32 83.31 333.09 7,511.40 7,456.00 - 7,246.89 - 8,525.85 5,950,307.56 369,065.90 0.75 - 2,395.98 MW D+I FR-AK-CAZ-SC (5) 16,749.17 83.44 333.83 7,522.11 7,466.71 - 7,164.38 - 8,567.06 5,950,390.72 369,026.04 0.80 - 2,303.78 MWD +IFR- AK- CAZ -SC (5) 16,770.30 83.43 333.41 7,524.53 7,469.13 - 7,145.57 - 8,576.38 5,950,409.68 369,017.03 1.98 - 2,282.80 MWD +IFR- AK- CAZ -SC (5) 16,821.31 83.62 332.91 7,530.28 7,474.88 - 7,100.35 - 8,599.27 5,950,455.26 368,994.88 1.04 - 2,232.12 MW D+ I FR-AK-CAZ-SC (6) 16,923.53 8329 332.45 7,541.93 7,486.53 - 7,010.12 - 8,645.87 5,950,546.23 368,949.75 0.55 - 2,130.58 MWD +IFR- AK- CAZ -SC (6) 17,013.87 83.97 333.16 7,551.95 7,496.55 - 6,930.26 - 8,686.91 5,950,626.73 368,910.03 1.08 - 2,040.80 MWD+ I FR-AK-CAZ-SC (6) 17,109.12 85.46 333.63 7,560.73 7,505.33 - 6,845.46 - 8,729.38 5,950,712.21 368,868.94 1.64 - 1,945.99 MWD +IFR- AK- CAZ -SC (6) 17,204.88 85.15 333.70 7,568.56 7,513.16 - 6,759.93 - 8,771.72 5,950,798.41 368,828.00 0.33 - 1,850.59 MW D+I FR-AK-CAZ-SC (6) 17,304.66 84.47 333.36 7,577.59 7,522.19 - 6,670.98 - 8,816.01 5,950,888.06 368,785.17 0.76 - 1,751.26 MWD +IFR- AK- CAZ -SC (6) 17,395.59 85.21 333.73 7,585.77 7,530.37 - 6,589.90 - 8,856.35 5,950,969.78 368,746.15 0.91 - 1,660.73 MWD +IFR- AK- CAZ -SC (6) 17,490.64 86.51 334.86 7,592.63 7,537.23 -6,504.48 - 8,897.47 5,951,055.85 368,706.43 1.81 - 1,566.01 MWD +IFR- AK- CAZ -SC (6) 17,586.56 88.92 339.47 7,596.46 7,541.06 - 6,416.18 - 8,934.65 5,951,144.74 368,670.70 5.42 - 1,470.59 MWD +IFR- AK- CAZ -SC (6) 17,642.96 88.12 340.17 7,597.91 7,542.51 - 6,363.26 - 8,954.10 5,951,197.96 368,652.11 1.88 - 1,414.73 MW D+ I FR-AK-CAZ-SC (6) 17,682.08 87.94 340.19 7,599.26 7,543.86 - 6,326.48 - 8,967.36 5,951,234.95 368,639.46 0.46 - 1,376.03 MW D+ I FR-AK-CAZ-SC (6) 17,779.77 90.47 341.48 7,600.61 7,545.21 - 6,234.22 - 8,999.42 5,951,327.71 368,608.90 2.91 - 1,279.52 MW D+ I FR-AK-CAZ-SC (6) 17,877.74 91.34 341.71 7,599.07 7,543.67 - 6,141.28 - 9,030.35 5,951,421.14 368,579.49 0.92 - 1,182.93 MWD +IFR- AK- CAZ -SC (6) 17,971.21 89.48 341.24 7,598.40 7,543.00 - 6,052.66 - 9,060.04 5,951,510.22 368,551.25 2.05 - 1,090.74 MWD +IFR- AK- CAZ -SC (6) 18,066.06 89.73 336.49 7,599.05 7,543.65 - 5,964.21 - 9,094.23 5,951,599.20 368,518.50 5.01 - 996.60 MW D+ I FR-AK-CAZ-SC (6) 18,121.27 89.42 333.92 7,599.46 7,544.06 - 5,914.10 - 9,117.38 5,951,649.68 368,496.17 4.69 - 941.49 MW D+ I FR-AK-CAZ-SC (6) 18,164.51 89.24 333.34 7,599.97 7,544.57 - 5,875.36 - 9,136.59 5,951,688.72 368,477.60 1.40 - 898.27 MWD +IFR- AK- CAZ -SC (6) 18,259.90 89.98 331.81 7,600.62 7,545.22 - 5,790.70 - 9,180.52 5,951,774.09 368,435.06 1.78 - 802.89 MWD +IFR- AK- CAZ -SC (6) 18,355.52 89.61 330.66 7,600.96 7,545.56 - 5,706.88 - 9,226.53 5,951,858.63 368,390.42 1.26 - 707.28 MWD +IFR- AK- CAZ -SC (6) 18,450.48 90.84 331.09 7,600.59 7,545.19 - 5,623.93 - 9,272.75 5,951,942.32 368,345.56 1.37 - 612.34 MWD +IFR- AK- CAZ -SC (6) 18,539.70 91.21 331.11 7,598.99 7,543.59 - 5,545.83 - 9,315.86 5,952,021.10 368,303.73 0.42 - 523.15 MW D+ I FR-AK-CAZ-SC (6) 18,641.63 91.39 330.79 7,596.68 7,541.28 - 5,456.75 - 9,365.34 5,952,110.97 368,255.70 0.36 - 421.26 MWD+ I FR-AK-CAZ-SC (6) 18,728.75 91.65 331.64 7,594.37 7,538.97 - 5,380.42 - 9,407.28 5,952,187.96 368,215.02 1.02 - 334.18 MWD +IFR- AK- CAZ -SC (6) 18,832.78 90.22 332.58 7,592.67 7,537.27 - 5,288.49 - 9,455.93 5,952,280.67 368,167.87 1.64 - 230.17 MW D+ I FR-AK-CAZ-SC (6) 18,923.73 90.72 334.96 7,591.92 7,536.52 - 5,206.91 - 9,496.13 5,952,362.88 368,129.01 2.67 - 139.27 MWD +IFR- AK- CAZ -SC (6) 19,022.85 91.64 336.45 7,589.88 7,534.48 - 5,116.59 - 9,536.90 5,952,453.84 368,089.72 1.77 -40.38 MW D+I FR-AK-CAZ-SC (6) 19,114.96 91.89 336.07 7,587.04 7,531.64 - 5,032.32 - 9,573.96 5,952,538.70 368,054.03 0.49 51.43 MWD +IFR- AK- CAZ -SC (6) 19,214.38 90.16 333.11 7,585.27 7,529.87 - 4,942.54 - 9,616.61 5,952,629.15 368,012.86 3.45 150.72 MWD +IFR- AK- CAZ -SC (6) 11/10/2010 3:07 :32PM Page 7 COMPASS 2003.16 Build 69 S ConocoPhillips (Alaska) Inc. Definitive Survey Report Company: - ConocoPhillips(Alaska) Inc. Local Co- ordinate Reference: - Well CD4 - 25 Project: Western North Slope TYD Reference: CD4 -25 (36.4 +19) @ 55.40ft (Doyon 19) Site: CD4 Nanuq Pad MD Reference: CD4 -25 (36.4 +19) @ 55.40ft (Doyon 19) Well: CD4 - 25 North Reference: True - Wellbore: CD4 - 25 Survey Calculation Method: Minimum Curvature Design:' CD4 -25 Database: CPAI EDM Production Survey Map Map Vertical - MD _ Inc Azi TVD- TVDSS +N/-S *E/ -W Northing Easting DLS - Section (ft) - (°) (°) (ft) (ft) (ft) (ft) (ft) (ft) (11001 (ft) Survey Tool Name 19,305.60 89.17 329.53 7,585.80 7,530.40 - 4,862.53 - 9,660.38 5,952,709.86 367,970.40 4.07 241.91 MWD +IFR- AK- CAZ -SC (6) 19,399.80 89.61 331.19 7,586.80 7,531.40 - 4,780.66 - 9,706.96 5,952,792.46 367,925.16 1.82 336.07 MWD +IFR- AK- CAZ -SC (6) 19,493.30 90.84 329.37 7,586.43 7,531.03 - 4,699.47 - 9,753.31 5,952,874.40 367,880.14 2.35 429.52 MWD +IFR- AK- CAZ -SC (6) 19,589.60 90.84 330.21 7,585.02 7,529.62 - 4,616.26 - 9,801.76 5,952,958.38 367,833.05 0.87 525.74 MWD +IFR- AK- CAZ -SC (6) 19,690.03 91.03 331.59 7,583.38 7,527.98 - 4,528.52 - 9,850.60 5,953,046.89 367,785.65 1.39 626.13 MWD +IFR- AK- CAZ -SC (6) 19,786.31 91.40 334.26 7,581.34 7,525.94 - 4,442.82 - 9,894.41 5,953,133.29 367,743.25 2.80 722.37 MWD +IFR- AK- CAZ -SC (6) 19,881.22 90.35 334.53 7,579.89 7,524.49 - 4,357.24 - 9,935.42 5,953,219.51 367,703.64 1.14 817.18 MWD +IFR- AK- CAZ -SC (6) 19,977.47 90.29 335.11 7,579.36 7,523.96 - 4,270.14 - 9,976.37 5,953,307.26 367,664.11 0.61 913.31 MWD +IFR- AK- CAZ -SC (6) 20,072.25 90.28 334.68 7,578.88 7,523.48 - 4,184.31 - 10,016.58 5,953,393.72 367,625.31 0.45 1,007.97 MWD +IFR- AK- CAZ -SC (6) 20,168.02 91.64 334.43 7,577.28 7,521.88 - 4,097.85 - 10,057.72 5,953,480.84 367,585.58 1.44 1,103.63 MWD +IFR- AK- CAZ -SC (6) 20,263.62 90.84 335.06 7,575.21 7,519.81 - 4,011.40 - 10,098.50 5,953,567.93 367,546.22 1.07 1,199.10 MWD +IFR- AK- CAZ -SC (6) 20,358.80 91.77 334.12 7,573.04 7,517.64 - 3,925.46 - 10,139.33 5,953,654.52 367,506.80 1.39 1,294.15 MWD +IFR- AK- CAZ -SC (6) 20,448.47 89.91 332.59 7,571.73 7,516.33 - 3,845.32 - 10,179.53 5,953,735.29 367,467.90 2.69 1,383.78 MWD +IFR- AK- CAZ -SC (6) 20,550.35 90.84 332.78 7,571.06 7,515.66 - 3,754.81 - 10,226.28 5,953,826.55 367,422.64 0.93 1,485.65 MWD +IFR- AK- CAZ -SC (6) 20,639.40 90.59 332.70 7,569.95 7,514.55 - 3,675.65 - 10,267.07 5,953,906.35 367,383.15 0.29 1,574.69 MWD +IFR- AK- CAZ -SC (6) 20,737.25 94.62 334.76 7,565.50 7,510.10 - 3,588.02 - 10,310.32 5,953,994.66 367,341.33 4.62 1,672.37 MWD +IFR- AK- CAZ -SC (6) 20,834.52 94.00 334.15 7,558.19 7,502.79 - 3,500.51 - 10,352.15 5,954,082.84 367,300.93 0.89 1,769.27 MWD +IFR- AK- CAZ -SC (6) 20,928.65 87.39 329.93 7,557.05 7,501.65 - 3,417.44 - 10,396.25 5,954,166.61 367,258.20 8.33 1,863.32 MWD +IFR- AK- CAZ -SC (6) 20,983.29 85.65 328.93 7,560.37 7,504.97 - 3,370.48 - 10,423.98 5,954,214.00 367,231.23 3.67 1,917.80 MWD +IFR- AK- CAZ -SC (6) 21,019.82 85.34 328.91 7,563.24 7,507.84 - 3,339.30 - 10,442.78 5,954,245.49 367,212.94 0.85 1,954.17 MWD +IFR- AK- CAZ -SC (6) 21,102.53 84.90 328.95 7,570.27 7,514.87 - 3,268.71 - 10,485.31 5,954,316.76 367,171.57 0.53 2,036.46 MWD +IFR- AK- CAZ -SC (6) 21,168.00 84.90 328.95 7,576.09 7,520.69 - 3,212.84 - 10,518.95 5,954,373.16 367,138.85 0.00 2,101.58 PROJECTED to TD 11/10/2010 3 :07 :32PM Page 8 COMPASS 2003.16 Build 69 • HALLIBURTON 1 Sperry Drilling WELL LOG TRANSMITTAL To: State of Alaska November 29, 2010 Alaska Oil and Gas Conservation Commission Attn.: Christine Shartzer 333 West 7 Avenue, Suite 100 Anchorage, Alaska 99501 -3539 RE: MWD Formation Evaluation Logs: CD4- 25_PB1_L1 AK -MW- 0007364770 CD4 -25 50- 103- 20608 -00 2" x 5" MD TRIPLE COMBO Logs: 1 Color Log 2" x 5" TVD TRIPLE COMBO Logs: 1 Color Log 2 "x5" MD SONIC Logs: 1 Color Log 2x5" TVD SONIC Logs: 1 Color Log Digital Log Images & LWDG- formatted LIS Data w /verification listing: 1 CD Rom Contains data for CD4 -25 CD4 -25 PB1 50- 103 - 20608 -70 2" x 5" MD TRIPLE COMBO Logs: 1 Color Log 2" x 5" TVD TRIPLE COMBO Logs: 1 Color Log 2 "x5" MD SONIC Logs: 1 Color Log 2x5" TVD SONIC Logs: 1 Color Log Digital Log Images & LWDG- formatted LIS Data w /verification listing: 1 CD Rom Contains data for CD4 -25PB1 CD4 -25 L1 50- 103 - 20608 -60 2" x 5" MD GAMMA - RESISTIVITY Logs: 1 Color Log 2" x 5" TVD GAMMA - RESISTIVITY Logs: 1 Color Log Digital Log Images & LWDG- formatted LIS Data w /verification listing: 1 CD Rom Contains data for CD4 -25 L1 PLEASE ACKNOWLEDGE RECEIPT BY SIGNING AND RETURNING A COPY OF THE TRANSMITTAL LETTER TO THE ATTENTION OF: Sperry Drilling Attn: Bryan Burinda 6900 Arctic Blvd. x /09 - /6b 00'194 Anchorage, Alaska 99518 Office: 907 - 273 -3536 a 0 Cf 9 s Fa d/D -0 B t; .n '�r sari► . 1,01M C 0 0 2010 ,Date: Signed: maw & rlhr : s4 , ; E , • • Page 1 of 1 Schwartz, Guy L (DOA) From: Schwartz, Guy L (DOA) Sent: Monday, November 08, 2010 3:21 PM To: 'Ryan, Owen M' Subject: RE: CD4 -25 P 7 - D ,�0`i - i Sd Ryan, 1 The shallower packer setting is not an issue... but hopefully you will be able to land the tubing through the hook hanger assembly as planned. Guy Schwartz Senior Petroleum Engineer AOGCC 793 -1226 (office) 444 -3433 (cell) From: Ryan, Owen M [ mailto: Owen.M.Ryan @conocophillips.com] Sent: Monday, November 08, 2010 2:41 PM To: Schwartz, Guy L (DOA) Cc: Winfree, Michael Alex (Jr.) Subject: CD4 -25 Hey Guy, We are currently on CD4 -25 planning to run the tubing. There is a small possibility we will not be able to get through the hook hanger on this well and will have to set our packer 150 to 175 ft MD higher than expected. I have attached two schematics. One is the plan that we submitted in our permit to drill and the second is adjusted if we don't make it through the hook hanger. Please comment if there are any issues. It will probably be late tonight/ early morning when we run past the hook hanger. I have looked through the regs and don't see any issues. Thanks, Owen M. Ryan ConocoPhillips Alaska Completions Engineer Drilling & Wells Office 907 - 263 -4692 Cell 740 - 506 -0854 Owen.M.Ryan @Conocophillips.com 11/8/2010 0 0 ConocoPhillips Alaska Updated 11/08/2010 CD4 -25 Producer Note PROPOSED Upper Completion I / 'rip ,Ro7 /CD i - -I0 16" Conductor to 108' Proposed Uoner/Middle Completion Upper Completion MP sss, 1) Tubing Hanger 31' 2) 4 -1/2 ", 12.6#/ft, IBT -Mod Tubing 4) 4 -1/2" Camco BAL -O Landing Nipple (3.812" ID) 2,075' 5) 4 -1/2 ", 12.6#/ft, IBT -Mod Tubing 6) 4 -1/2" Camco KBMG -GLM w/ DV 4,877 10 -3/4" 45.5 ppf L -80 BTC -Mod 7) 4-1/2", 12.6##1, IBT -Mod Tubing Surface Casing 8) 4 -1/2" Camco KBMG -GLM w/ DV 10,159' Ill at 2,957' MD / 2,400' TVD 9) 4 -1/2 ", 12.6#!ft, IBT -Mod Tubing Cemented to Surface 10) 4 -1/2" Camco KBMG GLM w/ DCK2 Shear 13,055 11) 4 -1/2 ", 12.6#/ft, IBT -Mod Tubing 12)4 -1/2 ", "XN" Nipple (3.725" Min ID) 13,158' 14)4% IBT-Mod Box x3' / = EUE 8rdX -Over 15,170' GL J 13)3 -1/2 ", 9.3#/ft, EUE -Mod Tubing 14) 3 -1/2 Seals 15,210' 3 -1/2" 9.3 ppf L-80 EUE Tubing Middle Completion CD4-25 MQ DM GL J 15) PBR 16) Baker 3 -' x 7 5/8" Premier Packer 15,225' 17) 3 -1/2 ", 9.3 # /ft, EUE -Mod Tubing (1 jt) 18) 3 -14 CMU Sliding Sleeve (2.813 X Profile) 15,273' 1 19) 3 -1/2 ", 9.3 #/ft, EUE -Mod Tubing (1 jt) i,, Qannik Interval 20) 3 -1/2 ", "XN" Nipple (Min ID 2.75) 15,347' Top +/- 6,520' MD 21) 3 -1/2", 9.3#/ft, EUE -Mod Tubing Base +/- 6,769' MD 22)3-1/2', 9.3#/ft, IBT -mod Pin x EUE -Mod Box 16,326' GL 23) 3 -1/2 ", 9.3#/ft, IBT -Mod SCC Tubing 24) 3 -1/2 ", 9.34/ft, EUE -mod Pin x IBT -Mod Box 25)3 -1/2 ", Anchor latching assembly 16,425' O Stage Collar +/- 7,081 MD if / ✓ , t40 Lower Completion CD4 -25 (Alpine Cl MD ND w l 1) 4'A x 7 5/8" Model B -1 Hook Hanger 16,425' 7,483' 2) 4 -% 12.6#, IBT, Slotted Liner 16,467 7,488' 3) 4 -% 12.6#, IBT, Blank Liner 17,659' 7,488' ~ I CO ` 4) 4 -% 12.6#, IBT, Slotted Liner 17,788 7,484' O h e 7 5) 4% IBT x 3 h SLHT X -Over (J 6) 3 % SLHT, 9.3# Bent Joint 17,976' 7,480' ' V. t C '� 7) 3 A 9.24 L -80 IBT Baker float guide shoe 17,977' 7,480' 000 Lower Completion CD4 -25 (Alpine Al MQ DM III 1) Liner Tie Back Sleeve with SBR 16,576' • 2) ZXP Liner top packer and hanger 12 3) 4 -% Anchor latching receptacle 16,618' 4) 4 -% 12.64, IBT -Mod 5) 4 -% 12.6#, IBT -Mod Oil Swell Packer in A sand 17,464' ` 'd• 5) 4 -% 1.6, IBT -Mod 1 jt ✓- 1L1 Kick Off Depth: 6) 4 -i4 12.6#, IBT -Mod, Perforated Pups Liner 21,160' 16,428' MD AL20,P725'INE C MD 2-1- -- -- - - -- = = /-tooK K 4 EIL 4-14 12.6#, L -80, IBT, Slotted Liner Az; A -t Ni.,,,,, O 0 0 0 21,168' MD 0 o 0 0 7 -5/8" 29.7 ppf L -80 BTC -M Production Casing 4 -'% 12.6#, L -80, IBT -Mod, Pre - Perforated Pups at 16,784' @ +/- 86.0° Page 1 of 1 Regg, James B (DOA) From: Winfree, Michael Alex (Jr.) [ Michael .A.Winfree @conocophillips.com] ty,-� ! � ,. j . D Sent: Thursday, October 21, 2010 5:26 PM To: Schwartz, Guy L (DOA); DOA AOGCC Prudhoe Bay; Regg, James B (DOA) Cft C Z''' Cc: Noel, Brian; Galiunas, Elizabeth C Subject: RE: Wellbore breathing incident Guy, Per our conversation, I have documented the functioning of our BOPE for our exhale test to comply with the AOCGG Industry Guidance Bulletin No. 10 -003. Date of BOPE Use: 10/19/2010 13:00 hrs Well: CD4 -25 Location: Alpine CD4 Pad PTD Number: 209 -150 Rig Name: Doyon 19 Operator Contact: Mike A. Winfree 265 -6820 or Dave Burley at 670 -4300 Operations Summary: 6 -3/4" production hole was TD'd. Backreamed to the 7 -5/8" casing shoe. Monitored well at the shoe and the well bore appeared to be breathing. An exhale test was performed to confirm breathing. The upper pipe rams were functioned to shut in the well. The following pressures were observed CP = 18 psi DP = 34 psi. The rams were opened and flow from the well was observed to decrease to 0.25 bph before the rams were functioned closed again and the following pressures observed CP = 10 psi DP = 0 psi. BOPE Used: Upper Pipe Rams Reason for BOPE Use: Perform exhale test to confirm well bore breathing Actions to be Taken: Test upper pipe rams after pulling out of hole with drilling BHA. Please let me know if you require additional information regarding our exhale test at CD4 -25. Thank You, Mike A. Winfree 907 265 6820 From: Schwartz, Guy L (DOA) [ mailto:guy.schwartz @alaska.gov] Sent: Wednesday, October 20, 2010 3 :35 PM To: Winfree, Michael Alex (Jr.) Subject: Wellbore breathing incident Mike, I just talked to the inspectors on the slope and there is a form that needs to be filled out. Since the SI did generate pressure the incident needs to be documented. The rig supervisor was emailed the form earlier today. Guy Schwartz Senior Petroleum Engineer AOGCC 793 -1226 (office) 444 -3433 (cell) 11/2/2010 • • Page 1 of 2 Schwartz, Guy L (DOA) From: Winfree, Michael Alex (Jr.) [ Michael .A.Winfree @conocophillips.com] Sent: Tuesday, October 12, 2010 6:12 AM To: Schwartz, Guy L (DOA) p7-1) 207 - / 5 Subject: RE: CD4 -25 Intermediate Casing Point Revision Attachments: CD4 -25, 758 1st stage Summary,V3, 12.0 ppg Mud, 20101010.pdf; CD4 -25, 758 2nd Stage Summary, 12.0 mud, V3, 20101010.pdf Guy, Attached are the revised cement procedures for CD4 -25 intermediate. -Mike Mike A. Winfree 907.265.6820 From: Schwartz, Guy L (DOA) [ mailto:guy.schwartz @alaska.gov] Sent: Tuesday, September 28, 2010 2:23 PM To: Winfree, Michael Alex (Jr.) Subject: RE: CD4 -25 Intermediate Casing Point Revision Mike, Your proposal doesn't require any permitting changes. The intermediate casing will still be landed within the " Alpine Pool" and will isolate hydrocarbon zones assuming cementing is done properly. Please send me a revised cementing procedure and I will update our well file accordingly. Guy Schwartz Senior Petroleum Engineer AOGCC 793 -1226 (office) 444 -3433 (cell) From: Winfree, Michael Alex (Jr.) [mailto:Michael.A.Winfree @conocophillips.com] Sent: Tuesday, September 28, 2010 1:01 PM To: Schwartz, Guy L (DOA) Subject: CD4 -25 Intermediate Casing Point Revision Guy, We are currently evaluating a plan to set 7 -5/8" intermediate casing in the B shale just below the Alpine C sand instead of setting casing in the Alpine A sand as stated in the application for the Permit to Drill. The advantage to setting casing in the B shale is that it minimizes the exposure time from first cutting the unstable Miluveach shale to getting it cased. Below is the proposed procedure: 1. Continue sidetracking off of plug at 13,200' MD 10/12/2010 • Page 2 of 2 2. Drill to 16,700' MD ( -622' MD shallower than planned) 3. Condition hole for casing run 4. POOH with drilling assembly 5. RU and run 7 -5/8" The shallower casing point is planned to reduce shale exposure time by 14 -18 hours. Operationally the production drill out, lower completion, window milling, drilling and completing the upper lateral and running upper completion will operationally be the same, only the depths will have changed. The well is planned as a dual lateral producer and I am unaware of any regulatory issues with the proposed plan outlined above. Please advise if the proposed plan forward is in compliance with State regulations or requires additional information to proceed. Thanks, -Mike Doyon 19 is currently drilling ahead at 13,370' MD Mike A. Winfree Drilling Engineer 907.265.6820 Direct 907.242.0246 Cell 10/12/2010 • • CD4 -25 Schlumberger CemCADE Preliminary Job Design 7 -5/8" Intermediate Casing o2o ( St' Rig: Doyon 19 1st Sta. e (V2 - 12.0 Mud) Location: Alpine Client: COP Revision Date: 10/10/2010 Volume Calculations and Cement Systems Prepared by: Mike Martin o Location: Anchorage, AK Volumes are based on 40% excess. The top of the tail slurry is designed to be Phone: (907) 263 -4207 at 11,370' MD. Mobile: (907) 748 -6900 email: martin13 @slb.com Tail Slurry Minimum pump time: 320 min. (pump time plus 120 min.) 15.8 ppg Class G + 0.2 %D46, 0.3 %D65, 0.11 %B155, 0.4% D167 - 1.16 ft3 /sk 0.2148 ft /ft x (16,800' - 11,370') x 1.40 (40% excess) = 1633 ft 0.2578 ft /ft x 80' (Shoe Joint) = 21 ft 1633 ft + 21 ft = 1654 ft 1654 ft 1.16 ft /sk = 1426 sks Previous Csg. < 10 -3/4 ", 45.5.# casing Round up to 1430 sks at 2,968' MD BHST = 172 °F, Estimated BHCT = 129 °F. (BHST calculated using a gradient of -2.0 °F /100 ft. below the permafrost) PUMP SCHEDULE Pump Rate Stage Cumulative Stage Time Stage Volume Time (bpm) (bbl) (min) (min) CW100 5.0 50.0 10.0 10.0 Pause 0.0 0.0 5.0 15.0 MUDPUSH II 5.0 40.0 8.0 23.0 Pause 0.0 0.0 3.0 26.0 Alpine Intermediate Tail 6.0 294.4 49.1 75.1 Pause 0.0 0.0 3.0 78.1 Water 5.0 10.0 2.0 80.1 Pause 0.0 0.0 3.0 83.1 < Top of Cement at Mud 6.0 640.0 106.7 189 Slow rate, ECD 4.0 60.0 15.0 204.8 11,370' MD Slow, bump plug, open 3.0 57.7 19.2 DV 224.0 MUD REMOVAL < 7 -5/8 ", 29.7# casing in 9 -7/8" OH Expected Mud Properties: 12.0 ppg, P < 20, T,, < 22_ Spacer Properties: 12.5 ppg MudPUSH* Il, P = 20 - 24, T = 37 - 41 TD at 16,800' MD Centralizers: As per COP program (7,528' TVD) * Mark of Schlumberger 0 0 CD4 -25 Schlumberger CemCADE Preliminary Job Design 7 -5/8" Intermediate Casing - 20'1 -15 - v Rig: Doyon 19 2nd Sta•e - Qannik (V3- 12.0 mud) Location: Alpine Client: COP Revision Date: 10/10/2010 Volume Calculations and Cement Systems Prepared by: Mike Martin o Location: Anchorage, AK Volumes are based on 40% excess. The top of the tail slurry is designed to be Phone: (907) 263 -4207 at 6,011' MD (500' MD above Qannik). Mobile: (907) 748 -6900 email: martin13 @slb.com Tail Slurry Minimum pump time: 205 min. (pump time plus 120 min.) 15.8 ppg Class G + 0.2 %D46, 0.3 %D65, 0.8% S2 - 1.16 ft3 /sk 0.2148 ft /ft x (7,075' - 6,011') x 1.40 (40% excess) = 320 ft 320 ft 1.17 ft /sk = 274 sks Round up to 280 sks Previous Csg. < 10 -3/4 ", 45.5.# casing at 2,968' MD BHST = 107 °F, Estimated BHCT = 95 °F. (BHST calculated using a gradient of -2.0 °F /100 ft. below the permafrost) PUMP SCHEDULE Pump Rate Stage Cumulative Stage Time Stage Volume Time (bpm) (bbl) (min) (min) CW100 5.0 20.0 4.0 4.0 MUDPUSH 11 5.0 30.0 6.0 10.0 Alpine Surface Tail 5.0 57.0 11.4 21.4 Pause 0.0 0.0 5.0 26.4 Water 5.0 10.0 2.0 28.4 Pause 0.0 0.0 3.0 31.4 < 7 -5/8 ", 29.7# casing Mud 5.0 305.8 61.2 92 in 9 -7/8" OH Mud 3.0 9.0 3.0 95.6 < Top of Cement at MUD REMOVAL 6,011' MD Expected Mud Properties: 12.0 ppg, P < 20, T < 22. Spacer Properties: 12.5 ppg MudPUSH* II, 20 - 24, T = 37 - 41 Note: ECDs will be approximately 13.0 ppg and rise to approximately 13.4 ppg at plug the end of displacement. Collar at 7,080' MD (4,344' TVD) Mark of Schlumberger r � • Page 1 of 3 Schwartz, Guy L (DOA) From: Schwartz, Guy L (DOA) Sent: Friday, September 24, 2010 10:37 AM To: 'Robertson, Ryan G' Cc: Winfree, Michael Alex (Jr.) Subject: RE: CD4 -25 Kuparuk Cement Plug and Kick Off Plug (PTD 209 -150) Ryan /Mike: Under the circumstances the cement plug where positioned will sufficiently isolate the Kuparuk sands considered the shale below will ultimately collapse. A waiver is granted as per 20 AAC 25.112(1 ). You have verbal approval to continue as outlined below. Guy Schwartz Senior Petroleum Engineer AOGCC 793 -1226 (office) 444 -3433 (cell) From: Robertson, Ryan G [mailto: Ryan. G.Robertson ©conocophillips.comJ Sent: Friday, September 24, 2010 10:10 AM To: Schwartz, Guy L (DOA) Cc: Winfree, Michael Alex (Jr.) Subject: RE: CD4 -25 Kuparuk Cement Plug and Kick Off Plug (PTD 209 -150) Guy, As per your conversation with Mike Winfree Jr... Doyon 19 was able to work the 3.5" cement stinger to a depth of 14,871' MD over the course of the evening, however deteriorating hole conditions prevented running the stinger past this point to the intended cementing point of 14,941' MD. In addition, the cement stinger was temporarily stuck in the hole at this depth for several hours before the crews were able to work it free. Once free, the stinger was pulled to a depth of 14,805' MD, and the crews were able to reciprocate and circulate without issue. Below is the revised proposal to isolate the Kuparuk C formation, which is driven by the concern that attempting to work the cement stinger to 14,941' MD below the base of the Kuparuk will result in stuck pipe. Proposed Plan Forward: 1. Set 15.8 ppg Class G balanced plug from 14,805' MD to 14,522' MD (300' MD above the Kuparuk sand) 2. Circulate above plug and pull stinger up to 13,850' MD and set hi viscosity gel pill 3. Rig up and pump densified 17.0 ppg balanced plug from 13,550' MD to 13,150' MD. (Planned kick off point is 13,450' MD) 4. Pull out of hole and lay down cement stinger 5. Pick up drilling BHA and run in hole and tag kick off plug 6. Begin sidetrack operations. See the revised CD4 -25 Cement Plug Placement schematic that is attached for additional information. Thanks, Ryan 9/24/2010 • Page 2 of 3 From: Winfree, Michael Alex (Jr.) Sent: Thursday, September 23, 2010 5:15 PM To: Robertson, Ryan G Subject: FW: CD4 -25 Kuparuk Cement Plug and Kick Off Plug (PTD 209 -150) FYI Mike A. Winfree 907.265.6820 From: Schwartz, Guy L (DOA) [mailto:guy.schwartz @alaska.gov] Sent: Thursday, September 23, 2010 4:13 PM To: Winfree, Michael Alex (Jr.) Subject: RE: CD4 -25 Kuparuk Cement Plug and Kick Off Plug (PTD 209 -150) Mike, I agree with your proposal below. It is not necessary to tag the Kuparuk zone cement plug as long as the operation goes as planned. You have a semi "base" (collapsing shale) to lay in the plug from and there is little doubt that it will be isolated as it is a small zone TVD wise. If your tag depth of the "kick off' plug comes in a lot different that expected please notify me right away. As we discussed this Plugback becomes CD4 -25PB1 and has a API number ending in -70 operations and log data for this lateral should be included in the final 407 report when the well is finished. Regards, Guy Schwartz Senior Petroleum Engineer AOGCC 793 -1226 (office) 444 -3433 (cell) From: Winfree, Michael Alex (Jr.) [mailto: Michael .A.Winfree @conocophillips.com] Sent: Thursday, September 23, 2010 3:54 PM To: Schwartz, Guy L (DOA) Subject: CD4 -25 Kuparuk Cement Plug and Kick Off Plug Guy, Per our earlier conversation regarding operations at Doyon 19, due to Miluveach shale instability we were unable to get our drilling BHA back to bottom and continue drilling the intermediate hole section to planned casing point. The decision was made to sidetrack pending the states approval of the procedure below. 7. Pull out of hole with drilling BHA (Currently laying down BHA as of 15:00 hrs) 8. Pick up cement stinger and run in hole to 14,941' MD and set 15.8 ppg Class G balanced plug to 14,522' MD (300' MD above the Kuparuk sand) 9. Circulate above plug and pull stinger up to -13,850' MD and set hi viscosity gel pill 10. Rig up and pump densified 17.0 ppg balanced plug from 13,550' MD to 13,150' MD. (Planned kick off point is 13,450' MD) 11. Pull out of hole and lay down cement stinger 12. Pick up drilling BHA and run in hole and tag kick off plug 13. Begin sidetrack operations. 9/24/2010 MOW Page 3 of 3 • Plugs are planned with 40% excess. A schematic of the proposed plugs is shown below. Please advise if a tag is required on the Kuparuk plug or if you have any comments on the proposed procedure. CD4 -25 RKB - GL = 36.3' 9;;2312010 w«s+.sd I' ► 16' Conductor tot 1a• sI0000 mud i■ hOIt 10.31'V 40 Fox L-80 BTCM • Surface Casing 2.957 MD 12,213• TVO Luz,Q .: 4 srls. l Cemented to Surface L•4t Ljoa\!N allmod tq Toa Mom t t flfL M+ Top of Plug 13.150' MD KG ;lug 13.50' MD Bottom of Plug 90 W 13.550' MD TOD Hlx2 13464'ktl? hi vis Top of Plug #1 IK... ..gctotarp 3 r. 14.527 MD Bottom of Plug 01 14.941' MD Unable to recover hole past 15.000' MD due to shale stability. 9.78' Intermediate Hole Bottom of hole 31 16.016' MD 17.460' ND In Miuveacn She Mike A. Winfree Drilling Engineer 907.265.6820 Direct 907.242.0246 Cell 9/24/2010 Page 1 of 2 Schwartz, Guy L (DOA) From: Winfree, Michael Alex (Jr.) [ Michael .A.Winfree @conocophillips.com] Sent: Thursday, September 23, 2010 3:54 PM To: Schwartz, Guy L (DOA) Subject: CD4 -25 Kuparuk Cement Plug and Kick Off Plug Prp Zed -LC Guy, Per our earlier conversation regarding operations at Doyon 19, due to Miluveach shale instability we were unable to get our drilling BHA back to bottom and continue drilling the intermediate hole section to planned casing point. The decision was made to sidetrack pending the states approval of the procedure below. 1. Pull out of hole with drilling BHA (Currently laying down BHA as of 15:00 hrs) 2. Pick up cement stinger and run in hole to 14,941' MD and set 15.8 ppg Class G balanced plug to 14,522' MD (300' MD above the Kuparuk sand) 3. Circulate above plug and pull stinger up to -13,850' MD and set hi viscosity gel pill 4. Rig up and pump densified 17.0 ppg balanced plug from 13,550' MD to 13,150' MD. (Planned kick off point is 13,450' MD) 5. Pull out of hole and lay down cement stinger 6. Pick up drilling BHA and run in hole and tag kick off plug 7. Begin sidetrack operations. Plugs are planned with 40% excess. A schematic of the proposed plugs is shown below. Please advise if a tag is required on the Kuparuk plug or if you have any comments on the proposed procedure. 9/23/2010 Page 2 of 2 • • CD4-25 RK8 -GL =36.3' 9/23/2010 I I - W. ad 16' Conductor to 114' 11.0 ppp mudi+not 10-314- 40 ppt L-80 BTCM Surface Casing 2.95TlV/2.213'ND ,o ; . „ Cemented to Surface tl,r- l,,,,,,:► b_rs4' to Tao Manna it a0-:;' 14f. Top of Plug 13.150' MD r ``f pf 13:50' MO ,, B ottom of Plug KOP 30 bbl 13.550' MO Tap HRZ 11,45T MO M vii , I I Top of Plug al Tess t4HFatU C 14222' MD Et i x 'j j 14.522 MD j � eaafKcOatuk� 14441 Mt? S , a s F D Bottom of Plug t11 , 14.941' MD Unable to recover hole past 15,000' MD due to shale stability. 9.718" Intermediate Kole Bottom of hole at -e. 16,016' MD r 7.460' ND In Mluveach Shale Mike A. Winfree Drilling Engineer 907.265.6820 Direct 907.242.0246 Cell 9/23/2010 SITAIE ALASEA SEAN PARNELL, GOVERNOR ALASKA OIL AND GAS 333 W. 7th AVENUE, SUITE 100 CONSERVATION COMMISSION ANCHORAGE, ALASKA 99501 -3539 PHONE (907) 279 -1433 FAX (907) 276 -7542 G. L Alvord CPAI Drilling Manager ConocoPhillips Alaska, Inc. P.O. Box 100360 Anchorage, AK 99510 -0360 Re: Colville River Field, Alpine Oil Pool, CD4 -25 ConocoPhillips Alaska, Inc. Permit No: 209 -150 (revised) Surface Location: 2277' FNL, 535' FEL, SEC. 24, T11N, R4E Bottomhole Location: 476' FNL, 730' FEL, SEC. 27, T11N, R4E Dear Mr. Alvord: Enclosed is the approved application for permit to drill the above referenced development well. This permit supersedes and replaces the permit previously issued for this well dated November 25, 2009. This permit to drill does not exempt you from obtaining additional permits or an approval required by law from other governmental agencies and does not authorize conducting drilling operations until all other required permits and approvals have been issued. In addition, the Commission reserves the right to withdraw the permit in the event it was erroneously issued. Operations must be conducted in accordance with AS 31.05 and Title 20, Chapter 25 of the Alaska Administrative Code unless the Commission specifically authorizes a variance. Failure to comply with an applicable provision of AS 31.05, Title 20, Chapter 25 of the Alaska Administrative Code, or a Commission order, or the terms and conditions of this permit may result in the revocation or suspension of the permit. Sincerely, • % Daniel T. Seamount, Jr. Sfi Chair DATED this 3 /da of August, 2010. cc: Department of Fish 86 Game, Habitat Section w/o encl. (via e -mail) Department of Environmental Conservation w/ o encl. (via e -mail) A. OIL AND GAS CONSERVATION COMMON ` ' F ` IVED PERMIT TO DRILL 1 9 201r . - 20 AAC 25.005 RGVI Si a'? la. Type of Work: 1b. Proposed Well Class: Development - Oil es , Service - Winj ❑ Single Zone . 0,.„ lc. Specify jt,yygll ' r pre. for: Drill El ' Redrill ❑ Stratigraphic Test ❑ Development - Gas ❑ Service - Supply ❑ Multiple Zone ❑ Coalbed Gas i ] as"-4y ':'25S°I_1` Re -entry ❑ Exploratory ❑ Service - WAG ❑ Service - Disp ❑ ' "ici " f4le Gas ❑ 2. Operator Name: 5. Bond: Blanket 0 Single Well ❑ 11. Well Name and Number: ConocoPhillips Alaska Inc. Bond No. 59 -52 -180' CD4 -25 3. Address: 6. Proposed Depth: 12. Field /Pool(s): P.O. Box 100360 Anchorage AK 99510 -0360 MD: 21,519 ' TVD: 7,555 4a. Location of Vygll. (Governmental Section): 7. Propert esi9natiQO ()�— a p�mber) Colville River Field Surfacel2 535FEL, Sec 24, T11N, R4E f AD 3007 A L 209 • `1,1 2 7 /'-- Alpine Oil Pool Top of Produ e H o�it / o "' 8. Land Use Permit: 13. Approximate Spud Date: 847FSL, 1384FWL, Sec 26, T11N, R4E ALK 380077 9/6/2010 Total Depth: 9. Acres in Property: 14. Distance to Nearest Property: 476FNL, 730FEL, Sec 27, T11N, R4E 2560 1.5 miles to AVCG Boundary 4b. Location of Well (State Base Plane Coordinates - NAD 27): 10. KB Elevation above 1 55.3 feet ' 15. Distance to Nearest Well Open Surface x- 377707 k y- 5957414 Zone- 4 GL Elevation above 1 19 feet „ to Same Pool: CD4 -05 at 1,258' 16. Deviated wells: Kickoff depth: 350 feet - 17. Maximum Anticipated Pressures in psig (see 20 AAC 25.035) Maximum Hole Angle: 90 degrees Downhole: 3,535 Surface: 2,663 / 18. Casing Program: Specifications Top - Setting Depth - Bottom Cement Quantity, c.f. or sacks Hole Casing Weight Grade Coupling Length MD TVD MD TVD (including stage data) 42" 16" 62.5# H-40 Welded 80' 37 37 114 114 Pre - Installed 13 -1/2" 10 -3/4" 45.5# L -80 BTC -M 2,935 37 37 2,972 2,400 540 sx ASL, 280 sx cl G 9 -7/8" 7 -5/8" 29.7# L -80 BTC -M 16,994 37 37 17,031 7,588 1490 sx cl G, 280 sx cl G for K2 6 -3/4" 4 -1/2" 12.6# L -80 IBTM 5,284 16,235 7,500 21,519 7,555 Liner 3 -1/2" 9.3# L -80 EUE Tubing 19. PRESENT WELL CONDITION SUMMARY (To be completed for Redrill and Re -Entry Operations) Total Depth MD (ft): Total Depth TVD (ft): Plugs (measured): Effect. Depth MD (ft): Effect. Depth TVD (ft): Junk (measured): Casing Length Size Cement Volume MD TVD ,I' r 1 1 uII1 i111,' $ ; 111111 - - 9 --_ sl Ii1 1 1 IIIIIIIIIIhI i ll III',Id IIII 1 - d 11 P�ulll i 111111 '�IIII _ Conductor /Structural h��r1' � -! : hIIY1 ° V II I iii IIII +�1' I 11 1 111 111 : _ ev111I III. �- °1 �I 1pil� 11111 1 �,VI�w11I1I1Il III VIII r'. pp i h 1 1 =�� � u r. =' 1 : ° „ 1 p pp 1.!c. ^, �_ �, h1 p I 1 � __ 111 �'� h' 111 II I ��- 11 p „pills` 1 t .f 1 111 1 ��11� I � I �- Surface Yi i"i111111II1111 11 a „1111111 1V 111PII,�p1ii$ 6 tTAl 9 (lu ” 1 h H 1 II I I f. ;111111IIV ,� ` Ip G^IG 7''l' �I�IIIIliilu.. A"`> v 1 11111 1 1�111.•'� ;; R Vlll l� „� — - - -�;11V V = 11Mv'' '��, ^� 1 u 1 _ , Ih' d' - � lli - 1 I�. puull - - = = a. , 11 ; ; ;11 �l'ligl v .. _- ; •_- 1ili 4; 111 1 '� I - ., {u IIIIIIII I�111, r o 11. -- - ai;;lq IIII . .-- -- "II �I DI 111 1; 11 1 ' =ii �--r,;f Intermediate "IIII 1 1I111IV1 4 U1 1 � . I 1 ; I .�s , , II 4 1 1 11 ` -- � �� =-' IIIIIIVIIo1 w - -- � ��1�V,,I� - �� -,,:, = I 11 II � dull. { - 114 � lalll III Ilp — I G� �, 11116 1111 flul ,;; ql P 11 1 11;;,,,, ll� 1 1 11 # 1 11 111111 "I�1114 1 1I u Production I U i I! I�I,II ti '. � 11 u1,p N111 1 —_ pl Il I� Ilhl�ll6ll;, ,r.9,,;II M I�� ° ": i 11 �,II�7 tlV11VIIlV1�. �. u1 �I °u11 111 IIII 4 '_x111111111 I1i1:`. Iw;lll,,IIII1�11111n 11 11111TI ii 3 a� ^Il'11111 II11111I - I TI , Liner vl _ �i I 11 11 1 i11 11 1 1 111I1111I 1 1 ";: 111 . - 11 111 u11 Ill ^ I 1 V u,1111!,11 l 1 II M 1 Illlll IV I v ^ R11 � _- �tl IIIIIuJ 11111111, I IL, +11 IJ�lo11 d lu llp v -�'vxl u,1 , III � 1'�, Perforation Depth MD (ft): NA Perforation Depth TVD (ft): NA 20. Attachments: Property Plat ❑ BOP Sketch ❑ Drilling Program 0 Time v. Depth Plot ❑ Shallow Hazard Analysis 0 Diverter Sketch ❑ Seabed Report ❑ Drilling Fluid Program 0 20 AAC 25.050 requirements 0 21. Verbal Approval: Commission Representative: Date 22. I hereby certify that the foregoing is true and correct. Contact Printed Name G.L Alvord /J Title CPAI Drilling Manager _� Signature -_ _ 4 t ) �,,,,,✓l / -A- C li y 1I*F Phone Z j j '°6 f 7 / Date efh 51/ 0 Commission Use Only Permit to Drijy� c p ' API Number: Permit Approv 1 See cover letter for other Number: 4 50- 7C 1 -r— , L' `Ci_7 ate: '� J © requirements. Conditions of approval : If box is checked, 9 , well may not be used to explore for, test, or produce coalbed methane, gas hydrates, or gas contained in shales: Er Other: --V. 3S t0 p$Z L.Dc IL 1e5' Samples req'd: Yes ❑ No E, Mud log req'd: Yes ❑ No [ 1 // 5 �� Z S measures: Yes ❑ No[✓ Directional svy req'd: Yes ['No El 44SOO p 5 L 4h h ce.< c tom. � D;0e--(' -( W a.tveS 20 AAC- Z 5.035(h)( APPROVED BY THE COMMISSION 3"/ / /�© DATE: , COMMISSIONER F. 3010 A '- ` 7. /V ORIGINAL Form 10 (Revised 7/2009) This permit is valid for 24 months from the date of approval (20 AAC 25.005(g)) Sub ' u D • CD4 -25 Drilling Hazards Summary 13 -1/2" Hole / 10 -3/4" Casing Interval Event Risk Level Mitigation Strategy Conductor Broach Low Monitor cellar continuously during interval. Well Collision Low Gyro single shots, traveling cylinder diagrams Monitor well at base of permafrost, increased mud Gas Hydrates Low weight, decreased mud viscosity, increased circulating times, controlled drilling rates, low mud temperatures Running Sands and Gravel Low Maintain planned mud parameters, Increase mud weight, use weighted sweeps. Abnormal Pressure in Surface Formations Low Increased mud weight >2000' TVD Lost Circulation Low Reduced pump rates, mud rheology, lost circulation material, use of low density cement slurries 9 -7/8" Hole / 7 -5/8" Casing Interval Event Risk Level Mitigation Strategy BOPE drills, Keep mud weight above 9.6 ppg. Abnormal Pressure Low Check for flow during connections and if needed, increase mud weight. Reduced pump rates, reduced trip speeds, real time Lost circulation Low equivalent circulating density (ECD) monitoring, mud rheology, lost circulation material Reduced trip speeds, mud properties, proper hole Hole swabbing on trips Moderate filling, pumping out of hole, real time equivalent circulating density (ECD) monitoring, weighted sweeps. Adding circulating sub to drill string. Abnormal Reservoir Low Well control drills with rig crew including identifying Pressure kicks. Good pressure model in the area. Hydrogen Sulfide gas Low H drills, detection systems, alarms, standard well control practices, mud scavengers 6 -3/4" Hole / Horizontal Production Hole Event Risk Level Mitigation Strategy Reduced pump rates, reduced trip speeds, real time Lost circulation moderate equivalent circulating density (ECD) monitoring, mud rheology, lost circulation material Reduced trip speeds, Pump out to 7 -5/8" shoe, mud Hole swabbing on trips Moderate properties, proper hole filling, pumping out of hole, real time equivalent circulating density (ECD) monitoring, weighted sweeps. BOPE drills, Keep mud weight above 8.8 ppg. Abnormal Reservoir Medium Check for flow during connections and if needed, Pressure increase mud weight. Well control drills, increased mud weight. Hydrogen Sulfide gas Low H drills, detection systems, alarms, standard well control practices, mud scavengers ORIGINAL • • Procedure 1. MIRU Doyon 19. 2. Rig up riser, dewater cellar as needed. 3. Drill 13 -1/2" hole to the surface casing point as per the directional plan. • 4. Run and cement 10 -3/4" surface casing. 5. Install and test BOPE to 250 psi low and 3,500 psi high. • 6. PU and RIH with 9 -7/8" drilling assembly. Pressure test casing to 3,500 psi. 7. Drill out shoe track and 20' of new hole. Perform formation integrity test. 8. Continue drilling 9 -7/8" hole to intermediate casing point in the Alpine A sand. - 7� te,4 M.5 ) 1 9. Run and cement 7 -5/8" casing as per program, including second stage cement job to isolate the K2. 10. Carry out a leak off test down the 10- 3/4 "x7 -5/8" casing annulus to confirm the fracture pressure referenced to the casing shoe. 11. Freeze protect casing annulus and casing. bu)?4P v8K-5 - 12. BOPE test to 3500 psi high and 250 psi low. 13. PU and RIH 6 -3/4" drilling BHA. 14. Pressure test casing to 3,500 psi. 15. Drill out 9 -7/8" shoe track and 20' of new hole. Perform formation integrity test to 12.5 ppg EMW. 16. Drill 6 -3/4" horizontal section to well TD. 17. Circulate the hole clean and pull out of hole. 18. Run lower completion of 4 -W 12.6 #, L -80 IBTM blank liner with pre - perforated pups. 19. Set packer and pull out of hole with running tool pn) Note: Operations listed below are covered under the CD4 -25L1 Application for Permit to Drill and are provided here for information only C D - 2_- 20. PU whipstock assembly and run in the hole and set on depth 21. Mill window into Alpine C sand c.b4 -ZSL 1 22. PU 6 -3/4" drilling assembly and run in hole 23. Drill to TD of Alpine C sand lateral per directional plan. 24. POOH and run liner completion of 4 -W 12.6 #, L -80 IBTM slotted liner 25. RIH and retrieve whipstock ORIGINAL • 26. MU hook hanger assembly and run in hole 27. Orient hook hanger and land 28. PU 3 -1/2" 9.3# EUE -Mod gas lift completion and RIH 29. Land tubing in lower seal latch assembly 30. Drop ball and rod to set upper packer 31. Shear upper seal pins and sting out of PBR 32. Circulate in completion brine. 33. Space Out and Land tubing. 34. Install TWC and test hanger seals to 5,000 psi 35. Remove two way check 36. Pressure test tubing to 3,500 psi to ensure seals are holding 37. Bleed tubing pressure to 2,000 psi. 38. Pressure test annulus to 3500 psi for 30 min. 39. Bleed tubing pressure to shear valve on lower GLM. 14. Install TWC and pressure up annulus to test TWC from below 15. Nipple down BOP 16. Nipple up tree and test adapter assembly to 5,000 psi 17. Remove 2 way check. 18. Circulate tubing to diesel and install freeze protection in the annulus. 19. Set BPV and secure well. Move rig off. ORIGINAL • • Well Proximity Risks: Directional drilling / collision avoidance information as required by 20 ACC 25.050 (b) is provided in the following attachments. CD4 -24 is the nearest existing well to CD4- 25wp12. Ellipse to ellipse separation is 13.47' at 523' MD. Drilling Area Risks: Unstable Shales: Intermediate hole sections in this area have shown shale instability at lower mud weights. Plan to use mud weight sufficient to stabilize shales based on offset data. Lost circulation: - Faulting within the Alpine reservoir section is considered to be the most likely cause of lost circulation. Standard LCM material is expected to be effective in dealing with lost circulation. Annular Pumping Operations: Incidental fluids developed from drilling operations on well CD4 -25 will be injected into a permitted annulus on CD4, or the class 1 disposal well on CD1 pad. The CD4 -25 surface /intermediate casing annulus will be flushed with 300 bbls of fresh water prior to freeze protecting with diesel to 2000' TVD. The only significant hydrocarbon zone is the Qannik reservoir and there will be 500' of cement fill above the top of the Qannik as per regulations. Upon completion of CD4 -25, form 10 -403, Application for Sundry Operations, will be filed. Annular pumping of fluids occurring due to drilling operations, per regulation 20 AAC 25.080, could then begin once properly permitted. As stated above, any zones containing significant hydrocarbons will be isolated prior to initiating annular pumping. There will be no USDW's open below the shoe or potable /industrial water wells within one mile of the receiving zone. Reference the enclosed directional drilling plan for other formation markers in this well. Surface casing will be set near the base of the Schrader Bluff Formation (C -40). These 450 -500' thick shales are part of the Colville Group and are known to provide vertical barriers to fluid flow in other areas. The maximum volume of fluids to be pumped down the annulus of this well will not exceed 35,000 bbl without the permission of the AOGCC. Fluid densities will range from diesel to a maximum of 12.0 ppg for drilling fluid wastes. Using 12.0 ppg fluid and the rig's maximum pumping pressure of 1,500 psi for annular injection, the maximum pressure at the surface casing shoe is estimated by: Max Shoe Pressure = (12.0 ppg) * (0.052) * (Surf. Shoe TVD) + 1,500 psi = (12.0 ppg) * (0.052) * (2,400') + 1,500 psi = 2,997 psi Pore Pressure = 1,086 psi Differential = 2997 —1086 = 1911 psi. The internal casing pressure is conservative, since frictional losses while pumping have not been taken into consideration. The surface and intermediate casing strings exposed to the annular pumping operations have sufficient strength by using the 85% collapse and burst ratings listed in the following table: Wt Connection 85% of 85% of OD (ppf) Grade Range Type Collapse Collapse Burst Burst 10 -3/4" 45.5 L -80 3 BTC -M 2,480 2,108 psi 3,580 psi 3,043 psi 7 -5/8" 29.7 L -80 3 BTC -M 4,790 psi 4,071 psi 6,890 psi 5,856 psi ORIGINAL . . DRILLING FLUID PROGRAM 10- 3 /4 "su casing Int. hole to 7 -5/8" casing Production Hole rf point — 13 -1/2" hole point — 9 -7/8" hole Section — 6 3/4" Density 8.8 — 9.6 ppg 9.6 —10.0 ppg 8.8 - 9.2 ppg PV 10 — 25 15 —22 YP 20 -60 15 -25 25 -30 Funnel Viscosity 100 — 200 Initial Gels 4 — 8 9 — 12 10 minute gels <18 10 - 14 API Filtrate NC — 10 cc / 30 min 5 — 12 cc /30 min (drilling) HPHT Fluid Loss at 160 <5 cc /30 min PH 8.5 -9.0 9.0 -10.0 OWR 80/20 Surface Hole: A standard high viscosity fresh water / gel spud mud is recommended for the surface interval. Keep flow line viscosity at ± 200 sec /qt while drilling and running casing. Reduce viscosity prior to cementing. Maintain mud weight < 9.6 ppg by use of solids control system and dilution where necessary. Intermediate Hole Section: Fresh water gel / polymer mud system. Ensure good hole cleaning by pumping regular sweeps and ' maximizing fluid annular velocity. Maintain mud weight at or below 9.8 ppg and plan to weight up to 11.0 ppg for lower shale stability. Be prepared to add loss circulation material. Good filter cake quality, hole cleaning and maintenance of low drill solids (by diluting as required) will all be important in maintaining wellbore stability. Production Hole Section : The drill -in fluid for Alpine producer wells will be a 80/20 oil /water ratio VERSAPRO mineral oil based drill -in - fluid designed to minimize filter cake lift off pressure. The base fluid will be high flashpoint ( >200° F), low aromatics, LVT -200 mineral oil. The internal phase will consist of 33% by weight CaCl2 brine with emulsifiers and wetting agents. SAFE -CARB 2 and S -200 calcium carbonate will be used as a bridging agent for proper filter cake building and fluid loss control. ORIGINAL • • Completion Schematic ConocoPhillips Alaska CD4 -25 Producer Updated - 08/18/2010 lil .i::1■ Sperry Well plans 16" Conductor to 108' CD4- 25wp12 Upper Completion MD TVD 1) Tubing Hanger 41' 41' 2) 4 -1/2 ", 12.6 # /ft, IBT -Mod Tubing (2 jts) - 3) Crossover 4-1/2" x 3 -1/2" 4) 3 -1/2" Camco TRMAXX -5E SSSV (2.812" ID) 2,299' 2,000' S'[ 10-3/4 "45.5 ppf L -80 BTC -Mod 5) 3 -1/2 ", 9.3#/ft, EUE -Mod Tubing Surface Casing at 2,972' MD / 2,400' TVD 6) 3 -1/2" Camco KBMG-GLM w/ DV 5,036' 3,400' ink Cemented to Surface 7) 3 -1/2 ", 9.3 # /ft, EUE -Mod Tubing 8) 3 -1/2" Camco KBMG -GLM w/ DV 10,300' 5,600' cL 9) 3 -1/2 ", 9.3 # /ft, EUE -Mod Tubing 10) 3 -1/2" Camco KBMG GLM w/ DCK2 Shear 13,220' 6,746' 11) 3 -1/2 ", 9.3 # /ft, EUE -Mod Tubing (2 jts) 31/2 • 9.3 Tubing 80EUE , T 12) 3 -1/2 ", "X" Nipple 13,300 6,774' 13) 3 -1/2 ", 9.3 # /ft, EUE -Mod Tubing 14) 3 -1/2" Seals 15,377' 7,354 roc =5,700 Middle Completion CD4 -25 MQ TVD Qannik Interval 15) PBR GL Top +/- 6,512' MD / 4,111' TVD 16) Baker 3 -' /2" x 7" Premier Packer 15,380' 7,354' Base + /- 6,761'MD/4,218'TVD 17) 3 -1/2 ", 9.3 # /ft, EUE -Mod Tubing (1 jt) 18) 3-W CMU Sliding Sleeve 15,460' 7,373' Ali Stage Collar 19) 3 -1/2 ", 9.3 # /ft, EUE -Mod Tubing (1 jt) ' i „ +/- 6800'MD/4,234'TVD 20) 3 -1/2 ", "XN" Nipple 15,500' 7,383' "� ` 21) 3 -1/2 ", 9.3 # /ft, EUE -Mod Tubing 22) 3 -1/2 ", Anchor latching assembly 16,275' 7,505' Lower Completion CD4 -25 (Alpine C1 MU TVD ": "€ TOC cg +1- 14,500' MD / 7,129' TVD GL J 1) Hook Hanger 16,085' 7,482' 2) 4'/2" Slotted Liner Lower Completion CD4 -25 (Alpine A) MD TVD ��� 1) Liner Tie Back Sleeve with SBR 16,235' 7,500' 2) ZXP Liner top packer and hanger 3) 4 -'/2" Anchor latching receptacle 16,275' 7,505' � L, Kick Off Depth: 4) 4 -' /2" Perforated Pups Liner 16,300' 7,508' ,, 16,085' MD 7,482' TVD \ ALPINE C 7,445' TVD 4-W 12.6#, L-80, SLHT, Slotted Liner /14 .. ALPINE A / - 4 4 �, e' , , O O O O 21,519'MD ( J J r " l o O O o 7,555' TVD 7 -5/8" 29.7 ppf L -80 BTC-M Production Casing at 17,031' = 7,588' TVD (g+/- 86.0" ORIGINAL 1 1 • • PRESSURE INFORMATION (per 20 ACC 25.005 ( c) (3,4) and as required in 20 ACC 25.035 (d) (2)) The following presents data used for calculation of anticipated surface pressure (ASP) during drilling of this well: Csg Setting Fracture Pore Casing Size Depth Gradient pressure ASP Drilling (in) MD/TVD(ft) (lbs. / gal) (psi) (psi) 16 114 / 114 10.9 52 53 10 -3/4" 2,972 / 2,400 14.5 1086 1570 7 -5/8" 17,031 / 7,588 16.0 3,434 - 2663 N/A 21,519 / 7,555 16.0 3,419 N/A • NOTE: The Doyon 19 5000 psi BOP equipment is adequate. Test BOP's to 3500 psi. PROCEDURE FOR CALCULATING ANTICPATED SURFACE PRESSURE (ASP) ASP is determined as the lesser of 1) surface pressure at breakdown of the formation casing seat with a gas gradient to the surface, or 2) formation pore pressure at the next casing point less a gas gradient to the surface as follows: 1) ASP = [(FG x 0.052) - 0.1]D Where: ASP = Anticipated Surface pressure in psi FG = Fracture gradient at the casing seat in lb/gal 0.052 = Conversion from lb./gal to psi /ft 0.1 = Gas gradient in psi /ft D = true Vertical depth of casing seat in ft RKB OR 2) ASP = FPP — (0.1 x D) Where; FPP = Formation Pore Pressure at the next casing point ASP CALCULATIONS 1. Drilling below conductor casing (16 ") ASP = [(FG x 0.052) — 0.1] D = [(10.9 x 0.052) — 0.1] x 114 = 53 psi OR ASP = FPP —(0.1 x D) = 1,086 — (0.1 x 2,400') = 846 psi 2. Drilling below surface casing (10 -3/4 ") ASP = [(FG x 0.052) — 0.1] D = [(14.5 x 0.052) — 0.1] x 2,400 = 1,570 psi OR ASP = FPP — (0.1 x D) = 3,434 — (0.1 x 7,588) = 2,675 psi 3. Drilling below intermediate casing -5/8" 9 9( (7-5/8") ASP = FPP — (0.1 x D) = 3,419 — (0.1 x 7,555') = 2,663 psi ORIGINAL • ........... I' I I ConocoPhillips(Alaska) Inc. Western North Slope CD4 Nanuq Pad Plan: CD4 -25 Plan: CD4 -25 Plan: CD4-25wp12 REVISED changed tool cades for gyro and 10:32 am, Aug 17, 2010 1 depth of gyro run. Standard Proposal Rep ort '" lh'' a C PI III 17 August, 2010 }u11 q ■ lrr ALL3 ■ ■ Sperry Drilling Services iq 9V1 9 ORIGINAL Easting (4000 ft/in) ■I1 1 1,1111,1Iiiil m i1iml iiji1iiii1 i,1 ' NoinL iAiiIiiii1.1.111 1 1 li mI lttil m _ � I 1sJ111 11 1I 11:02, August 17 201L1- _ Alpine 1 - - Bergschrund 2A - _ Alpine 1B _ — CD4 -07 — — Bergschrund 2 — Neve 1 _ • _ CD4- 303wp06 - CD,-W- 16 CD4-301B — . _ CD4 -• - CD4 -208 Z D4 -1 CD4 -208P e 1 - z o - q � CD4-: 10 CD4- 303PB1wp06 - 3 . CD4 -26 w —5 CD4 -'04PB _ _ .._, - o 1 , -319 o C D4 -301A - c) Z - CD4 ' 18A ° C ~ �� , � CD4 320PB1 - i Ylir��—_ i — +•► � CD4 3�`2 = �' GD4 -301 24 1#111Fi* A , -� - CD4 -25 $ 12 1V" - - 14-321 - I �� , CD4 -3 - CD4 -2, * CD4- 298wp04 — _ • CD,AT' °:2 CDC` 1QD4 -209 Nanuq 5 = D4 -:15 _ CD4 -23 CD4 -214 - „ - ConocoPhillips(Alaska) Inc. - WNS - CD4 12wp06 - Western North Slope CD4 Nanuq Pad 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 - Easting (4000 ft/in) t 'a.../' Project: Western North Slope �" Site CD4 Nanuq Pad CD4 -25wp 12 Co nocoPhill ps Well: Plan: CD4 -25 0100 1 O I -5000 I 00 2 Alaska I 0 I j� ����GG��11''.,�., Wel!bore: Plan: CD4 -25 A 0DI 0 6 0 . Relathoky short, simple wells or simple profiles with law tortuosity DDI80 -64. Shorter wells with high tortoostly orbger wells wlh law tortuosity DDI = 7.143 00184-68. DD1 > 8 8 Log. torttuous th a hgh d405ree of dMiculy - 4_ HALLIBURTO N REFERENCE INFORMATION Surface Location 0 - - 0 Coordinate (NIE) Reference W88 Plan' CD4 -25. True North !" --" N Ing 1517741 31 7d 0 ® --- Vertical (1VD) Reference then: 36 3.19 87 55 308 (Doyen 19) Ground Level g 1517 - 00• Drilling Sectron(VS) Reference' Slot- (000N, 000E) Latitude 70 °173060348 C alcu tic MeOCtl Alaska ZOne4ature Longitude 150 1 59' 35584W 10.3/4 "X13 -1/2" X00 71 August (72010 Geodetic Datum. Norm American Datum 1983 - - - / - CASING DETAILS SURVEY PROGRAM 4-1/2" x 63 J /4" ti ND TVDSS MD Nacre size 1 - 240000 234470 297261 10-3/4 10 -3/4 "x13 -11 36.30 1350.00 C34-25w8121Plen: C04 -25) GYD-GCS5 � r1N1Q 758830 7533.00 1703124 7-5/8 7- 5/8 "X9 -7 /8" 1950.00 21519.15 C04-25wp12 /flan: C04-25) MWD +IFR- AKCOZ -SC , a;� 7555 30 7500.00 2151915 4 -1(2 4 -112' x 6514 - CP O � Q 1 2 4 0 0 0 - ry - CO 7" Name - -2500 Targets _ � Na 1VD55 +N / -5 �H -W Naming Easea9 snaps `t O - - - - 50 00 CD4 - 250807 Tin 750000 - 274743 - 1075460 5954590 00 1506944 00 Paint �Y' - 1 14 0 CD4-25wp07 Tcie - 0 SECTION DETAILS I _ _ AM ND N.18.18-51 Sec MD Inc AM +- +01 9019099 Eastng DLeg ]Face VS.0 Target 6 00 0 1 98 30 0.00 0.00 36.30 -19.00 0.00 0 500 5957161.34 1517141.31 030 0.00 0.00 0 00 • 2 350 00 0.00 0.00 350.00 294.70 0.00 0 00 5951161.34 1517141.31 0.00 0.00 0.00 t - 1 - 3 903.44 11.07 211.00 900.00 841.70 -45.00 -27.45 5957116.12 1017713.12 2.00 21100 -27.45 C 4 2507.81 0100 211.00 2203.73 2140.43 558.63 515.92 5856311.32 1517211.49 3.00 000 51592 0 309 10 5 6272.91 81.00 211.00 4000.00 9946.70 - 3630.32 3180.82 585358148 1515491.52 0.00 000 -2184,92 - $ D O - 8 8872.91 5700 211.00 4262.90 4207.80 4098.36 -2482.54 595310405 1515212.42 1.00 0.00 - 2402.54 1 0 1360313 7219 272.00 8872.80 6817.30 -8893.11 -623107 594857179 151136973 3.00 98.93 475024 5 NO° 9 14993.48 74.50 28500 7100.00 7044.70 4580.86 5971.95 5948698.10 1510624.84 1.80 81.41 4300.59 O _ -5000 - I Interp @ 7425 (Plan: CD4-25 Plan: CD4-25 CD4 -1i5 800 5000 10 15211.25 16.00 915.67 7320.80 7285.50 4171.86 -7819.55 9949118.50 190995407 3.50 91.18 5 ID 81187 0 11 15552.92 76.00 315.87 7398.08 7340.78 - 7955.94 - 7888.47 5949335.81 1509726.72 0.00 0 00 4322.20 12 15889.58 89.00 925,94 7457.85 7402.35 - 7700.31 4096.74 5949594.81 1509520.67 9.50 54.59 -2897.78 - - 19 16075.22 83.00 33189 7480.90 7425 00 - 7543.11 5102.84 5949753.55 1509427.35 3.50 90.40 -2819.98 0 0 0 14 18829.56 89.00 33169 7571.50 7516.20 5687.96 4542.61 5950414.27 1509088.15 0.00 0 00 -2071.20 - r 15 18912.28 88.00 33199 7580.00 7524.70 -6810.10 456420 595049279 1509047.84 330 0.00 - 1982.92 _ ` - 17 1706124 88.00 33199 7580.30 7533.00 4705.40 4654.22 5950525.00 1508973.97 0.00 0.00 - 1834,33 ? 17 1719427 80.00 331.89 7595.05 7535.75 486100 4710.22 5050743.51 1508919.13 0.00 0.00 -1834,30 3 37° 7518" X 9.718'' 7 7 ° 19 17194.57 00.86 331.89 7594.24 753994 4511.89 4713.09 5050743.51 1508899.86 3.00 0.00 - 16411 77 , 20 17580.01 1 91.68 331.89 7594.24 7529.98 4221.82 48.58 595/082227 150874286 3.00 0.00 - 1315.75 - 0 , 20 17580.04 91.88 391.89 1584.88 7529.98 5221.82 489098.55 595108821 1508149.18 0.00 0.00 -1315.75 r�� 10 21 17821.35 90.42 331.88 1589.99 1525.89 -518520 4918.01 5951123.00 1508724.30 3.00 -111.74 - 1270.45 _ 4\ �0 22 21519.15 90.42 331.88 7555.30 7500.00 374743 •10754.80 5954590.00 1508944.00 0.00 0.00 2823.24 CD425wp07 Toe _ - O -10000 -7500 -5000 -2500 0 7500- v 000 7 70 00 - -7500 1 I I I 1 I 1 I I I 1 1 1 1 1 I I I 1 1 I I I 1 I I I - , .0k O _ ^yam a 7 1 0- - °O O - - O° � ' o, _ O O - O 1000 - - 30° I 1 1 1 1 I 1 1 1 1 1 1 I 1 1 1 I 1 1 1 1 - C -30 2000 -10000 -7609 -5000 -2500 0 West( -) /East( +) (2505 ft/in) - . ANNOTATIONS 2500 C -20 0 NO MOSS MO 00118 Annotabon 4 O - _ _ __ _ 35000 29470 35000 Slat134212.00 O - - 900 844.70 903 44 Start OLS 3.00 TFO 000 III O 220373 73 214843 256781 Start 370510 25 at 6781 MD V) F0 6 D TF 4 00 3904.70 6272 91 Start DLS 100 TFO 000 10 -3/4 "x13 -1/2" 426290 420760 687291 Start 482966 hold at 687291 MD o - K -3 Marker S O 8150 00 6094 70 11702 57 Start DLS 300 TFO 96.93 Bassi K -3 0 42 - 687200 8817 30 13603 13 Start DLS 1 60 TFO 81 01 O 7100 00 7044 70 14393.48 310*4 015 3 50 TFO 91.18 7320.80 7265.50 1524123 51ar8 311.09 hold at 1524123 MD C - - - - - -- - - -- - - _ 7386 09 7340 78 15552 32 Start DL5 3 50 TF0 50 59 � g s - - - 7057 85 7402 35 15889 58 Start Turn 353 U - __ 7480 30 7425 00 16075.22 Start 74B 34 hold at 16075.22 MO K -2 Marker O 757150 7516.20 1682356 Star( DLS 336 TFO 000 y - Basal K-2 0 0 - 758000 752470 1691226 Start 118 hold at 1691226 MD 7588.30 7533 1703124 Start 30.00 hold at 1703124 MD 2 5 000- •000 5000 7590 39 7535.09 17081 24 Start Build 300 7595 05 7539.75 17194 57 Slat Build 300 - 7594 24 7536 94 17249 91 Start 33014 hold at 17249 91 MO .�°O� 7584.08 7529 38 17580,04 Start DLS 3 00 TFO -179 74 "06 7583.93 7528,63 17621.35 Start 3897.80 hold at 1762135 MD - z 7555.30 7500 2 TD519.15 Albian 96 0 0 7 -5/6" X 9 -7/6" 4 -1 /2" X 6 -3/4" FORMATION TOP DETAILS 1 1 N0Path NDSsPath MDPath Formation ✓ 2405 30 2350.00 2983.50 C -30 33 72 OOOe - 281230 2757.00 382308 C -20 - HRZ Bose HRZ _ q ^ o O 385030 379500 598413 K -3 Maker _ K -1 Marker Kuparuk Fa) LCU- Miluveac o _ _ _ _ _ _ p 4073 30 4018 DO 6427 90 Basal K-3 11111•1•10.111. : - _ - - - - - _ _ _ - - - - - - - p - - - I - p - - L - 4111 30 4056 00 6511 51 K -2 Maker /s1�� _ - _ -- - y - �_ M i _ _- L I 25L1wp112= 421830 418300 1178131 Basal -2 1 5 _ _ _ �. - - - _ ._ - _. -.- ... _. _ 7500 6945 30 6890 00 13844 80 6 V . O 1 Album 9 1500 -� - _ 7017 30 7022 00 14309 29 Base HRZ - , 6 714030 108500 1454398 K1 Marker t ` - _ 4 - _ - - - - - - - - - Alpine D - N- o o ° o o -, ICD4- 25wp11 _ 722030 716500 1484076 Kuparuk Fm n� - -UJU Alpine o 722530 717000 1486383 LCU- Mtluveach �/_ AIpi 1e A sa11G 4 ae( I I I I 1 I I I I I I 1 I I 1 1 I° 1 i 1 "I I 1 1 1 1 1 796930 741400 1598505 Alpine ,/ -10000 -7500 -5500 -2500 0 2500 CD425wp07 T 5 75 748130 742600 1608342 AIpreC 6a�� 7093 1438 1618189 Intl 1 7528 1693089 B3 sand › Vertical Section at 332.00° (2500 Win) 7588 30 7533 00 17031 24 Alone A Sand [/ter Project: Western North Slope Sit: CD4 Nanuq Pad Conoc hillipii s Wel l P CD4-25 CD4- 25wp12 Alaska <60. Releb0ey shod, simple wells or simple profiles with low tortuosity DDI 60 -64. Shorter walls with high torhostly or Mnger was with law tortuosity DDI = 7 °143 D0(64 -68. Lag wells with relebw9y tortuous pelves I1 � 001 > 6 8 Long. tortuous profiles with a high h degree of dlticul HALL • D4 REFERENCE INFORMATION Surface Location Co>l onele (NIE) Reference Well Plan CD4 -25. True Nor. Northing 5957161 34 ` "' °...... ' Vertical W cal (ND) Reference 36 3019 @ 55 306 (Doyen 19) EasOng 151]]41 31 o1-t° Drilling Seofion Reference: slst- IO.00N 000E) Ground Level 1900 C alculation Method. Minmum Curvature Latitude 70 ° 17' 30 603 N Geodetic Zone' Flasks Zone 4 Longitude 150° 59' 35 584 W 11'04 August 17 2010 Geodetic Datum. North American Datum 1983 -3750 3000 -2250 -1500 -750 0 750 1500 2250 3000 1 I 1 1 I 1 1 1 1 L 1 1 I 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 I 1 I 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 I 1 - HRZ • 7°5 °— Base HRZ K -1 Marker - Kuparuk Fm - 7200— LCU- Miluveach —]200 _ moo — — ° • m 0 N L O - _ O ro To 7350— —7350 U 1= CD4- 25L1wp1 _ I` Alpine D o° - - - _ AlpineC m - 4 -1/2" x 6 -3/4" • 7500 —7500 UJU no B3 sand ° o r.. . F'fi ICD4- 25wp112 (�/�J\ .o - _ o 0 0 o- .. _ rI N N i O 7650— Alpine A Sand 7 -5/6" X 9 -7/6' IC04- 25wp07 Toe —76s° V wee _ _ 1 1 1 1 1 1 1 I 1 I I I 1 1 1 1 1 1 I 1 1 1 1 1 I 1 1 1 1 1 1 1 1 1 1 1 I 1 1 1 1 1 1 I I I I I I 1 1 1 I 1 1 I -3750 -3000 -2250 -1500 -750 0 750 1500 2250 3000 � "' Vertical Section at 332.00 °(750 ft/in) • 'r."'" CD4- 25wp12 Plan View 0- 000 ,D0 10 -3/4" x 13-112" _ _ _ _Ii -1500— 00 0 259 0 12 CPA'' 4000 X 1 9 ,21 4 -1/2" x 6 -3/4" S O '2' 3000— 21000 00 o o nn 000 60 00 20 X4500— 00 0 Z 19000 800 0 o 1`b 6000 900 • �,-1-000 7 -5/8" X 9 -7/8" 7 00 00 -7500— 16000 7 700 � o 0 CI) ,� o v- 7 we...w 200 - 9000 — (J ._.� I 1 0 -12000 -10500 -9000 -7500 -6000 -4500 -3000 -1500 0 1500 West( -) /East( +) (1500 ft/in) IMIONIMIONIP t CD4-25wp12 Section View 0- 0 1000 1500— 30° 10 -3/4" x 13-1/2" 2 0,0. 0 0 0 0 0 ( 3000— 57 0 6 7° 0 0 so C 00 p 0 0 4500 — '' > a b 0 0 o , 0 0 0 6000— 7 ° 0 0 7 , i 7 -5/8" X 9 -7/8" N - t 0 c�` o 0 ° o 0 4 -1/2" x 6 -3/4" co c°a ° 0 p C) , ^ ---- (o 1 .,, 0 N 7500— c. r• p � ' wrr ° p p ° O O V! O O O O co 1 1 1 1 1 1 1 I 1 -7500 -6000 -4500 -3000 -1500 0 1500 3000 4500 > Vertical Section at 332.00 °(1500 ft/in) 1 • • ConocoPhillips HALLIBLIRTON Standard Proposal Report 1 Dafab 11111 11 EDM v16 Pro r £ . -t oc " Cd -ordinate Referen I III „i ; Well Plan: CD4 -25 .- I I I Ii 1 1ll 1p 1 "'pllllll 1 Plan: 36.3 +19 @ 55 1 1 1 Company I �,uII11111iI�IIIPJIi,1111 ConocoPhillips(Alaska) Inc. TVO RefI 61P1m uulllt::,1 .30ft- (Doyon 191 — roject VII I Western North Slope MD l2efe ce Plan: 36.3 +19 @ 55.30ft ( Doyon 19) .. V V III Site IIII111IIfIll,111,1liji CD4 Nanuq Pad North Re. IIII .n... - True ell 1 11 Plan: CD4 -25 :Survey - Calp l a ort Method. Minimum Curvature o 11 Plan: CD4 -25 VI II 1, pfellbore I I Desl n, CD4 25wp12 I . -= I iIlmuuuumll - I I Wh IIII.. • l ll r,iulllluuumllullull u u ur.- - - lll .,, ^IIIIIIIII ,� - I , IIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIII .. ect Westem North Slope Map System: US State Plane 1927 (Exact solution) System Datum: Mean Sea Level Geo Datum: NAD ••,1,,92T (NADCON CONUS) Using Well Reference Point Map Zone: Alaska Zone 04 Using geodetic scale factor Site II III CD4 Nanuq Pad um uuuuuumll rl loon¢ Intl - _ «' ^IUU Um -:. - •Iuimlu.11••; ' Site Position: Northing: 5,957,908.57ft Latitude: 70° 17' 36.666 N From: Map Easting: 377,794.25ft Longitude: 150° 59' 22.031 W Position Uncertainty: 0.00 ft Slot Radius: ” Grid Convergence: -0.93 ° (I ell Plan: CD4-25 Well Position +N/-S 0.00ft Northing: 5,957,41 ft - Latitude: 70° 17' 31.791 N +E/ -W 0.00 ft Easting: ;377,707.79ft Longitude: 150° 59' 24.316 W Position Uncertainty 0.00 if Wellhead Elevation: ft Ground Level: 119 00'sft -- Weltbore •Plan CD4 25 iu u11 i I,1 1 Manetic gs Model N ame Sa e1.e. Declina Dip l o ngte Fiel Strength II ., 1 II , . ., II, III I 4,1 II III IIIiII1 - ::::::::.,,,,,,,,,,,9,11,• 1 I - (nT) 1 .„ - BG GM2009 8/17/2010 16.49 I I l,l - �� 1 49 _ 1 � a 3 79.63 57,337 DCS,Ign CD4-25wp12 m u,uu. m 1 1 1 ,,. Audit Notes: Version: Phase: PLAN Tie On Depth: 36.30 Verticat Se - H - 74:1l IIIIII' DeptthFrom (TVt)) .+N/-SS + E/'w I IiIlI11 1 IlIlIl11 I g11 u VI II hI . IIII!1 V I I ilhl 1 11 1 i 1 1114 1 1 I ... (ft� Ih 11 ' - -_ ` f - -, '1 1 1 111 1 1111 1 I�u�Idi1 ''', (ft- .�liiil l.. (. - }' -.. - : : :. i 111111 , . . 36.30 0.00 0.00 332.00. • 8/17/2010 2:30:01PM Page 2 COMPASS 2003.16 Build 69 QR !GNAL • • ConocoPhillips HALLIBURTON Standard Proposal Report " ` "'IIIlllllluuuuuuull .. .,r,Illmml . ». .. . -.-' ''"'lnr itlll llllllll -, . I Il l i i .I ..�:a , .,,�,. ;77.1.IIIIIIIIIIIIIIIII --- -+;: Illllll::::,0 ::: 17 ase EDM v16 Prod Local Ca- ordinate Reference rl lll l l1 1 1V 11 11 Well Plan CD4 -25 C I lllhll lulh Conoco Phillips(Alaska) Inc. TVDR w IV uI 11 1 ' "1111 .3 +19 @ 55. dmo I 1 I �II IIIIII IIIlllllllll pro I Ct Western North S MD Referent ^ rt11 Plan: Plan: 36 +19 @ 55.30ft 30ft (Doyon (Doyon 19) 19) Site: I'j11111 Iilllllll ' CD4 Nanuq Pad North Refere 1 19 1 0 Il II I, I I ' True q }11�u11 °IVIIIIIIII ^m Well: Plan CD4 -25 l Survey Calcvla 1 Me thod Minimum Curvature 1Nellbor Plan CD4 -25 llllllll 1 IIpI1111111 Design 1 IIII CD4- 25wp12 III _ . . IIil II .am, , _- ,,,, -- 1,1, i'I .,. - „,,,l i.v -_ > -= lur" I IIWI Ip uuu .. 1 u 111 a nm 1 Plan ns Sectio . t Depth I W1Il pll ulllllll' 111110101!!1 I I ,u 11 '. Measured I II Vertical I fjl I II II g eg l BuiId1 Tu1CCl 111 1 inclination Azimuth Depth 5( +NIS 1111 111 +E / -W i 1 IRo 1 Rate Rate I I 1 11R 1 1 1 ate Tool lace p' ° l p s l j u ,il ° ° I - ° - I fft1 { ° : { ? {ft) {ft� {ftf I{ /101 III ft� (1100ft.11 1 I i l - ,, { 'i1 uIIV � !IP 1 I�I 1 36.30 0.00 0.00 36.30 -19.00 0 0.00 0.00 0.00 0.00 0.00 -350.00` 0.00 0.00 350.00 294.70 0.00 0.00 0.00 0.00 0.00 0.00 903.44 11.07 211.00 900.00 844.70 -45.68 -27.45 2.00 2.00 0.00 iR13,00 2,567.81 64.00= 211.00 2,203.73 2,148.43 - 858.63 - 515.92 3.00` 3.00 0.00 0.00 6,272.91 61.00 211.00 4,000.00 3,944.70 - 3,636.32 - 2,184.92 0.00 0.00 0.00 0.00 6,872.91 67.00 211.00 4,262.90 4,207.60 - 4,098.36 - 2,462.54 1.00 1.00 0.00 0.00 11,702.57 67.00 211.00 6,150.00 6,094.70 - 7,909.09 - 4,752.26 0.00 0.00 0.00 0.00 13,603.13 72.19 272.00 6,872.60 6,817.30 - 8,693.11 - 6,231.07 3.00 0.27 3.21 96.93 14,393.48 74.50 285.00 7,100.00 7,044.70 - 8,580.96 - 6,977.95 1.60 0.29 1.64 81.41 15,241.23 76.00 315.67 7,320.80 7,265.50 - 8,171.86 - 7,675.55 3.50 0.18 3.62 91.18 15,552.32 76.00 315.67 7,396.08 7,340.78 - 7,955.94 - 7,886.47 0.00 0.00 0.00 0.00 15,889.58 83.00 325.34 7,457.65 7,402.35 - 7,700.31 - 8,096.74 3.50 2.08 2.87 54.59 16,075.22 83.00 331.89 7,480.30 7,425.00 - 7,543.11 - 8,192.64 3.50 0.00 3.53 90.40 16,823.56 83.00 331.89 7,571.50 7,516.20 - 6,887.96 - 8,542.61 0.00 0.00 0.00 0.00 16,912.26 86.00 331.89 7,580.00 7,524.70 - 6,810.10 - 8,584.20 3.38 3.38 0.00 0.00 17,031; 324 86.00 331.89 7,588.30 7,533.00 - 6,705.40 - 8,640.12 0.00 0.00 0.00 0.00 17,061.24 86.00 331.89 7,590.39 7,535.09 - 6,679.00 - 8,654.22 0.00 0.00 0.00 0.00 17,194.57 90.00 331.89 7,595.05 7,539.75 - 6,561.49 - 8,716.99 3.00 3.00 0.00 0.00 17,249.91 91.66 331.89 7,594.24 7,538.94 - 6,512.69 - 8,743.06 3.00 3.00 0.00 0.00 17,580.04 91.66 331.89 7,584.68 7,529.38 - 6,221.62 - 8,898.55 0.00 0.00 0.00 0.00 17,621.35 90.42 331.89 7,583.93 7,528.63 - 6,185.19 - 8,918.01 3.00 -3.00 0.00 - 179.97 21_,520V,11'1I12 90.42 331.89 7,555.30 7,500.00 - 2,746.42 - 10,754.96 0.00 0.00 0.00 0.00 8/17/2010 2:30:01PM Page 3 COMPASS 2003.16 Build 69 ORIGINAL • • ConocoPhillips HALLIBURTON Standard Proposal Report m §as , v16 Prod "I La G ordi Referen p I I ! Well Plan: ' VI II „ = - . IIIIIIII . IIIIIIII�all� e• E DM -dim u m - I I Il lllilillll�l�l ' VI CD I I VIICD4-25 Campal l y: ConocoPhillips(Alaska) Inc. ND t efellhpul nce Plan: 36.3 +19 @ 55.30ft (Doyon 19) S Protect: ° Western North Slope MD Reference' Plan: 36.3 +19 @ 55.30ft (Doyon 19) ite: hill CD4 Nanuq Pad North Re ee: True ' Well: Plan: CD4-25 SurveyCalcWai on Method: -- Minimum Curvature 11 �signi IIIIIII IIII I I CD4-25wp12 I l ll il l l l l ll l muuluulll mwmr,..,,I Planned Suave y IIIIII VIII " °111i1 Measured Vertical gIIIIlllllliillllllllll Map Ma ll llll!Illlll'li lllli �- llllll IIIIIIII I - Depth I Azimuth ` Depth I I - +Nf '-S+ +E1-W Northing Easting 14 OLS Vert Secti ; Illl l 4 IIII - I Ip (III a 1!1;1: [ ft l - lu Ili .- [ °1 [fat I l III� I lft [fk (ft) -[ft) : [) -19.0 I I' I 36.30 0.00 0.00 36.30 - 1 19.00 0 0.00 5,957,414.20 377,707.79 0.00 0.00 100.00 0.00 0.00 100.00 44.70 0.00 0.00 5,957,414.20 377,707.79 0.00 0.00 200.00 0.00 0.00 200.00 144.70 0.00 0.00 5,957,414.20 377,707.79 0.00 0.00 300.00 0.00 0.00 300.00 244.70 0.00 0.00 5,957,414.20 377,707.79 0.00 0.00 350.00 0.00 0.00 350.00 294.70 0.00 0.00 5,957,414.20 377,707.79 0.00 0.00 Stark :13'6 d 2.00 - - - ... 400.00 1.00 211.00 400.00 344.70 -0.37 -0.22 5,957,413.83 377,707.56 2.00 -0.22 500.00 3.00 211.00 499.93 444.63 -3.37 -2.02 5,957,410.87 377,705.72 2.00 -2.02 600.00 5.00 211.00 599.68 544.38 -9.34 -5.61 5,957,404.95 377,702.03 2.00 -5.61 700.00 7.00 211.00 699.13 643.83 -18.30 -11.00 5,957,396.08 377,696.50 2.00 -11.00 800.00 9.00 211.00 798.15 742.85 -30.23 -18.17 5,957,384.27 377,689.14 2.00 -18.17 900.00 11.00 211.00 896.63 841.33 -45.12 -27.11 5,957,369.53 377,679.96 2.00 -27.11 903.44 11.07 211.00 900.00 844.70 -45.68 -27.45 5,957,368.98 377,679.61 2.00 -27.45 H. '''.Start: DLS 3.00 TFO 0.00 ' - 1,000.00 13.97 211.00 994.26 938.96 -63.62 -38.23 5,957,351.22 377,668.54 3.00 -38.23 1,100.00 16.97 211.00 1,090.63 1,035.33 -86.47 -51.96 5,957,328.59 377,654.44 3.00 -51.96 1,200.00 19.97 211.00 1,185.47 1,130.17 - 113.62 -68.27 5,957, 301.72 377,637.69 3.00 -68.27 1,300.00 22.97 211.00 1,278.52 1,223.22 - 144.98 -87.11 5,957,270.67 377,618.34 3.00 -87.11 1,400.00 25.97 211.00 1,369.53 1,314.23 - 180.48 - 108.44 5,957,235.53 377,596.44 3.00 - 108.44 1,500.00 28.97 211.00 1,458.25 1,402.95 - 220.01 - 132.19 5,957,196.39 377,572.05 3.00 - 132.19 1,600.00 31.97 211.00 1,544.43 1,489.13 - 263.46 - 158.30 5,957,153.37 377,545.24 3.00 - 158.30 1,700.00 34.97 211.00 1,627.85 1,572.55 - 310.72 - 186.70 5,957,106.58 377,516.08 3.00 - 186.70 1,800.00 37.97 211.00 1,708.26 1,652.96 - 361.66 - 217.31 5,957,056.15 377,484.65 3.00 - 217.31 1,900.00 40.97 211.00 1,785.45 1,730.15 - 416.14 - 250.04 5,957,002.22 377,451.04 3.00 - 250.04 2,000.00 43.97 211.00 1,859.21 1,803.91 - 474.01 - 284.81 5,956,944.93 377,415.33 3.00 - 284.81 2,100.00 46.97 211.00 1,929.33 1,874.03 - 535.10 - 321.52 5,956,884.45 377,377.64 3.00 - 321.52 2,200.00 49.97 211.00 1,995.63 1,940.33 - 599.26 - 360.07 5,956,820.93 377,338.05 3.00 - 360.07 2,300.00 52.97 211.00 2,057.93 2,002.63 - 666.30 - 400.35 5,956,754.56 377,296.69 3.00 - 400.35 2,400.00 55.97 211.00 2,116.04 2,060.74 - 736.04 - 442.26 5,956,685.51 377,253.66 3.00 - 442.26 2,500.00 58.97 211.00 2,169.81 2,114.51 - 808.30 - 485.68 5,956,613.97 377,209.07 3.00 - 485.68 2,567.81 61.00 211.00 2,203.73 2,148.43 - 858.63 - 515.92 5,956,564.15 377,178.02 3.00 - 515.92 _ Start 3705.0 hold at''2567.81 MD "- - 2,600.00 61.00 211.00 2,219.34 ' 2,164.04 - 882.76 - 530.42 5,956,540.2 377,163.13 0.00 - 530.42 2,700.00 61.00 211.00 2,267.82 2,212.52 - 957.73 - 575.46 5,956,466.04 377,116.88 0.00 - 575.46 2,800.00 61.00 211.00 2,316.30 2,261.00 - 1,032.70 - 620.51 5,956,391.82 377,070.62 0.00 - 620.51 2,900.00 61.00 211.00 2,364.78 2,309.48 - 1,107.67 - 665.55 5,956,317.60 377,024.37 0.00 - 665.55 2,972.64 61.00 211.00 2,400.00 2,344.70 - 1,162.13 - 698.28 5,956,263.68 376,990.76 0.00 - 698.28 10-314° x 13 -112" 2,983.58 61.00 211.00 2,405.30 2,350.00 - 1,170.32 - 703.20 5,956,255.57 376,985.71 0.00 - 703.20 C-30:: 3,000.00 61.00 211.00 2,413.26 2,357.96 - 1,182.64 - 710.60 5,956,243.38 376,978.11 0.00 - 710.60 3,100.00 61.00 211.00 2,461.74 2,406.44 - 1,257.61 - 755.65 5,956,169.15 376,931.85 0.00 - 755.65 3,200.00 61.00 211.00 2,510.22 2,454.92 - 1,332.58 - 800.69 5,956,094.93 376,885.60 0.00 - 800.69 3,300.00 61.00 211.00 2,558.71 2,503.41 - 1,407.55 - 845.74 5,956,020.71 376,839.34 0.00 - 845.74 3,400.00 61.00 211.00 2,607.19 2,551.89 - 1,482.52 - 890.79 5,955,946.49 376,793.08 0.00 - 890.79 8/172010 2:30:01PM Page 4 COMPASS 2003.16 Build 69 ORIGINAL • • ConocoPhillips Standard Proposal Report ' focal Ca- ord�ri I ' IR e f erence Well Plan: CD4 -25 Cd 11 a n ConocoPhillips(Alaska) mum „u,, p mm. �, m y p ( ) I I ' Database EDM v16 Prod Alaska Inc. TVD ef „', - Plan: 36.3 +19 @ 55.30ft (Doyon 19) u1 a u P , p ect: Iu l Western North Slope ;MD Reiirence: „ -. Plan: 36.3 +19 @ 55.30ft (Doyon 19) S ' CD4 Nanuq Pad l l No II ferencec' True e We11, i Plan: CD4 -25 Surv alculatian Met1III1lF11od: -� Minimum Curvature Wellgg I : Plan: CD4 -25 1 hiil' il'lug ((('il De sIgn,I III � I CD4- 25111wp12 m uum ...... m „uuuum, c.. „ Phnn 9�I l " �I� III u l n (IIII V'q, u, I „' UI110VIVI,IV11 111 I91g II II'p l Measu II I, De II '' cai Mam' Map ' u' o '1 tI ° Inclination ( Azimuth Depth TVDss d „I,'I'l, +NW Noi•th Eastma U llPtljl II DLS V e I rt I S ec � in P h' 11Ih1 IIII i i 1. I,V hS +EI- - (IIII I'1 , "'1 J ( ft II,VII,'III'IIi1 , '� { � {ft� ft _ _ {fta (..,, Vd I � I ' , !h', ' "IiIIIIIIIIl I il , ..:.:.7:::::: I V, 3,500.00 61.00 211.00 2,655.67 2,600.37 - 1,557.49 - 935.83 5,955,872.27 376,746.83 0.00 - 935.83 3,600.00 61.00 211.00 2,704.15 2,648.85 - 1,632.46 - 980.88 5,955,798.05 376,700.57 0.00 - 980.88 3,700.00 61.00 211.00 2,752.63 2,697.33 - 1,707.43 - 1,025.92 5,955,723.83 376,654.32 0.00 - 1,025.92 3,800.00 61.00 211.00 2,801.11 2,745.81 - 1,782.39 - 1,070.97 5,955,649.61 376,608.06 0.00 - 1,070.97 3,823.08 61.00 211.00 2,812.30 2,757.00 - 1,799.70 - 1,081.37 5,955,632.48 376,597.38 0.00 - 1,081.37 C-20 3,900.00 61.00 211.00 2,849.59 2,794.29 - 1,857.36 - 1,116.02 5,955,575.39 376,561.80 0.00 - 1,116.02 4,000.00 61.00 211.00 2,898.07 2,842.77 - 1,932.33 - 1,161.06 5,955,501.17 376,515.55 0.00 - 1,161.06 4,100.00 61.00 211.00 2,946.55 2,891.25 - 2,007.30 - 1,206.11 5,955,426.95 376,469.29 0.00 - 1,206.11 4,200.00 61.00 211.00 2,995.03 2,939.73 - 2,082.27 - 1,251.16 5,955,352.73 376,423.04 0.00 - 1,251.16 4,300.00 61.00 211.00 3,043.52 2,988.22 - 2,157.24 - 1,296.20 5,955,278.51 376,376.78 0.00 - 1,296.20 4,400.00 61.00 211.00 3,092.00 3,036.70 - 2,232.21 - 1,341.25 5,955,204.29 376,330.52 0.00 - 1,341.25 4,500.00 61.00 211.00 3,140.48 3,085.18 - 2,307.18 - 1,386.29 5,955,130.07 376,284.27 0.00 - 1,386.29 4,600.00 61.00 211.00 3,188.96 3,133.66 - 2,382.15 - 1,431.34 5,955,055.84 376,238.01 0.00 - 1,431.34 4,700.00 61.00 211.00 3,237.44 3,182.14 - 2,457.12 - 1,476.39 5,954,981.62 376,191.76 0.00 - 1,476.39 4,800.00 61.00 211.00 3,285.92 3,230.62 - 2,532.09 - 1,521.43 5,954,907.40 376,145.50 0.00 - 1,521.43 4,900.00 61.00 211.00 3,334.40 3,279.10 - 2,607.06 - 1,566.48 5,954,833.18 376,099.24 0.00 - 1,566.48 5,000.00 61.00 211.00 3,382.88 3,327.58 - 2,682.03 - 1,611.53 5,954,758.96 376,052.99 0.00 - 1,611.53 5,100.00 61.00 211.00 3,431.36 3,376.06 - 2,757.00 - 1,656.57 5,954,684.74 376,006.73 0.00 - 1,656.57 5,200.00 61.00 211.00 3,479.84 3,424.54 - 2,831.97 - 1,701.62 5,954,610.52 375,960.48 0.00 - 1,701.62 5,300.00 61.00 211.00 3,528.32 3,473.02 - 2,906.94 - 1,746.66 5,954,536.30 375,914.22 0.00 - 1,746.66 5,400.00 61.00 211.00 3,576.81 3,521.51 - 2,981.91 - 1,791.71 5,954,462.08 375,867.96 0.00 - 1,791.71 5,500.00 61.00 211.00 3,625.29 3,569.99 - 3,056.88 - 1,836.76 5,954,387.86 375,821.71 0.00 - 1,836.76 5,600.00 61.00 211.00 3,673.77 3,618.47 - 3,131.85 - 1,881.80 5,954,313.64 375,775.45 0.00 - 1,881.80 5,700.00 61.00 211.00 3,722.25 3,666.95 - 3,206.82 - 1,926.85 5,954,239.42 375,729.20 0.00 - 1,926.85 5,800.00 61.00 211.00 3,770.73 3,715.43 - 3,281.79 - 1,971.90 5,954,165.20 375,682.94 0.00 - 1,971.90 5,900.00 61.00 211.00 3,819.21 3,763.91 - 3,356.75 - 2,016.94 5,954,090.98 375,636.68 0.00 - 2,016.94 5,964.13 61.00 211.00 3,850.30 3,795.00 - 3,404.83 - 2,045.83 5,954,043.38 375,607.02 0.00 - 2,045.83 Kr3 Marker 6,000.00 61.00 211.00 3,867.69 3,812.39 - 3,431.72 - 2,061.99 5,954,016.76 375,590.43 0.00 - 2,061.99 6,100.00 61.00 211.00 3,916.17 3,860.87 - 3,506.69 - 2,107.03 5,953,942.54 375,544.17 0.00 - 2,107.03 6,200.00 61.00 211.00 3,964.65 3,909.35 - 3,581.66 - 2,152.08 5,953,868.31 375,497.92 0.00 - 2,152.08 6,272.91 61.00 211.00 4,000.00 3,944.70 - 3,636.32 - 2,184.92 5,953,814.20 375,464.19 0.00 - 2,184.92 Start DLS 1.00 TFd' - 6,300.00 61.27 211.00 4,013.08 3,957.78 - 3,656.66 - 2,197.14 5,953,794.07 375,451.64 1.00 - 2,197.14 6,400.00 62.27 211.00 4,060.38 4,005.08 - 3,732.18 - 2,242.52 5,953,719.30 375,405.05 1.00 - 2,242.52 6,427.90 62.55 211.00 4,073.30 4,018.00 - 3,753.38 - 2,255.26 5,953,698.32 375,391.97 1.00 - 2,255.26 B K - 3 6,500.00 63.27 211.00 4,106.13 4,050.83 - 3,808.40 - 2,288.32 5,953,643.85 375,358.02 1.00 - 2,288.32 6,511.51 63.39 211.00 4,111.30 4,056.00 - 3,817.22 - 2,293.61 5,953,635.11 375,352.58 1.00 - 2,293.61 I(2 Marker - 6,600.00 64.27 211.00 4,150.33 4,095.03 - 3,885.29 - 2,334.52 5,953,567.72 375,310.58 1.00 -2,334.52 6,700.00 65.27 211.00 4,192.95 4,137.65 - 3,962.83 - 2,381.11 5,953,490.96 375,262.74 1.00 - 2,381.11 6,761.31 65.88 211.00 4,218.30 4,163.00 - 4,010.68 - 2,409.86 5,953,443.59 375,233.22 1.00 - 2,409.86 Basal K - 8/17/2010 2:30:01PM Page 5 COMPASS 2003.16 Build 69 ORIGINAL ■11.. 0 0 Conoco Phillips HALL1BURTON Standard Proposal Report .-------------__ PatabaSe:.': '' EDM v16 Prod ''!:Lecatertittlitiateigefei*ripe,: Well Plan: CD4-25 •,,1 ''Ccimpaei.i.- ConocoPhillips(Alaska) Inc. :_]TViOeieeiiee: Plan: 36.3+19 @ 55.30ft (Doyon 19) ,.. • Project: Company Western North Slope i411tt.litiiePetiCe:: Plan ' 36.3+19 @ 55.30ft (Doyon 19) i ''..: , .. ..7!..:A00''..., - --, --...n . ; . - ----,-]?-,---- .., ;te:•.' .., ... 1 .•;0 1. 14$ CD4 Nanuq Pad - 4_4 : 9401viipterence . ..-k_]].-:,I:0:044 True 11111':''''e"''':' ' ''..4'0i i Plan CD4-25 ]= Minimum Curvature .:..... ... . __,:.„,,_ _ lie' .: ) i•iO4 1 tbOre: 1 ••::::Ilitiol Plan: CD4-25 --=,-----:- - - . • ,•:::01 • :::.:::•:•:.:::::.::.;'.. ,.--4A-,--_,.--_-H .,.01 I .1:111,:.;- .• CD4-25wp12 --,..----- ." . • .,:,,,,,, -,::::•:..:1•:;:,:..::,:,.. -.. -. .'•'. ''-', , :•;!i l l'illihreio : -- r _.,k: . ;:' ,:: '.1' - . '.:4,g111111110111111Pill ,- .. ....:'. ... :,...:.:,::.:.:,,:.' : '. -. - - - --:-:L::, '..11111111H1■1:19:: - - - -g-1, ,,- ,-....!■:111,11i1:11111111111111!IIVIln: .. ..... - --,Ii:i1:1 , : ' . ' ... . ,---- ' ',11111111; 1 11111111 1 11111111:' , - -'''-' ..: , u;...1..':',. - - .., - ,,,,,::', . - ----, ., .. .- ----.2:111141111111111111:..i.:1 ,... -. e-- -, ,,..,... - --,... ........,..j PlOried urvey Depth Mea :1! - ..,.;; Vertical .'"::...::.' . - _::_i . : ...:.:'...,:!:! ••:..... __ .' Map ---!-ii-.Atill:ItT'':-' Map bel*:= A.Zimuih --_ .' .• 4.1!!!!:,9,::,::,:: ____tEi-W ] -_ - ,::HH::!41,00thin0]]-::171;:::: :: Pasting _g4 ::::::: .. i_Vert S66066.1' (ft) ..F- : (a). '.::. . .. ry.:-,::.:(ft) : := - . . tiiit;i1P.:...... :it (ft} -:::;]- ':11,g.h:..::ftli ': :. : .::: (ft) '.. :]:;34- . .:':.H 4,178.69 „:: ft .... - ...:.... : - 6,800.00 66.27 211.00 4,233.99 4,178.69 -4,040.99 -2,428.07 5,953,413.57 375,214.51 1.00 -2,428.07 6,872.91 67.00 211.00 4,262.90 4,207.60 -4,098.36 -2,462.54 5,953,356.78 375,179.11 1.00 -2,462.54 ...:' S tart 4829.66 hold at 6872.91 MD' 6,900.00 67.00 211.00 4,273.49 ' 4,218.19 -4,119.74 -2,475.39 5,953,335.62 375,165.93 0.00 -2,475.39 7,000.00 67.00 211.00 4,312.56 4,257.26 -4,198.64 -2,522.80 5,953,257.50 375,117.24 0.00 -2,522.80 7,100.00 67.00 211.00 4,351.63 4,296.33 -4,277.54 -2,570.21 5,953,179.39 375,068.56 0.00 -2,570.21 7,200.00 67.00 211.00 4,390.71 4,335.41 -4,356.45 -2,617.62 5,953,101.27 375,019.88 0.00 -2,617.62 1 7,300.00 67.00 211.00 4,429.78 4,374.48 -4,435.35 -2,665.03 5,953,023.16 374,971.19 0.00 -2,665.03 7,400.00 67.00 211.00 4,468.85 4,413.55 -4,514.25 -2,712.44 5,952,945.04 374,922.51 0.00 -2,712.44 7,500.00 67.00 211.00 4,507.93 4,452.63 -4,593.15 -2,759.85 5,952,866.93 374,873.83 0.00 -2,759.85 7,600.00 67.00 211.00 4,547.00 4,491.70 -4,672.06 -2,807.25 5,952,788.81 374,825.15 0.00 -2,807.25 7,700.00 67.00 211.00 4,586.07 4,530.77 -4,750.96 -2,854.66 5,952,710.70 374,776.46 0.00 -2,854.66 7,800.00 67.00 211.00 4,625.15 4,569.85 -4,829.86 -2,902.07 5,952,632.59 374,727.78 0.00 -2,902.07 7,900.00 67.00 211.00 4,664.22 4,608.92 -4,908.76 -2,949.48 5,952,554.47 374,679.10 0.00 -2,949.48 8,000.00 67.00 211.00 4,703.29 4,647.99 -4,987.67 -2,996.89 5,952,476.36 374,630.41 0.00 -2,996.89 8,100.00 67.00 211.00 4,742.37 4,687.07 -5,066.57 -3,044.30 5,952,398.24 374,581.73 0.00 -3,044.30 8,200.00 67.00 211.00 4,781.44 4,726.14 -5,145.47 -3,091.71 5,952,320.13 374,533.05 0.00 -3,091.71 8,300.00 67.00 211.00 4,820.51 4,765.21 -5,224.37 -3,139.12 5,952,242.01 374,484.37 0.00 -3,139.12 8,400.00 67.00 211.00 4,859.58 4,804.28 -5,303.28 -3,186.53 5,952,163.90 374,435.68 0.00 -3,186.53 • 8,500.00 67.00 211.00 4,898.66 4,843.36 -5,382.18 -3,233.94 5,952,085.78 374,387.00 0.00 -3,233.94 8,600.00 67.00 211.00 4,937.73 4,882.43 -5,461.08 -3,281.35 5,952,007.67 374,338.32 0.00 -3,281.35 8,700.00 67.00 211.00 4,976.80 4,921.50 -5,539.99 -3,328.76 5,951,929.55 374,289.64 0.00 -3,328.76 8,800.00 67.00 211.00 5,015.88 4,960.58 -5,618.89 -3,376.17 5,951,851.44 374,240.95 0.00 -3,376.17 8,900.00 67.00 211.00 5,054.95 4,999.65 -5,697.79 -3,423.58 5,951,773.33 374,192.27 0.00 -3,423.58 9,000.00 67.00 211.00 5,094.02 5,038.72 -5,776.69 -3,470.99 5,951,695.21 374,143.59 0.00 -3,470.99 9,100.00 67.00 211.00 5,133.10 5,077.80 -5,855.60 -3,518.40 5,951,617.10 374,094.90 0.00 -3,518.40 9,200.00 67.00 211.00 5,172.17 5,116.87 -5,934.50 -3,565.81 5,951,538.98 374,046.22 0.00 -3,565.81 1 9,300.00 67.00 211.00 5,211.24 5,155.94 -6,013.40 -3,613.22 5,951,460.87 373,997.54 0.00 -3,613.22 9,400.00 67.00 211.00 5,250.32 5,195.02 -6,092.30 -3,660.63 5,951,382.75 373,948.86 0.00 -3,660.63 9,500.00 67.00 211.00 5,289.39 5,234.09 -6,171.21 -3,708.04 5,951,304.64. 373,900.17 0.00 -3,708.04 9,600.00 67.00 211.00 5,328.46 5,273.16 -6,250.11 -3,755.44 5,951,226.52 373,851.49 0.00 -3,755.44 9,700.00 67.00 211.00 5,367.54 5,312.24 -6,329.01 -3,802.85 5,951,148.41 373,802.81 0.00 -3,802.85 9,800.00 67.00 211.00 5,406.61 5,351.31 -6,407.91 -3,850.26 5,951,070.30 373,754.13 0.00 -3,850.26 9,900.00 67.00 211.00 5,445.68 5,390.38 -6,486.82 -3,897.67 5,950,992.18 373,705.44 0.00 -3,897.67 10,000.00 67.00 211.00 5,484.75 5,429.45 -6,565.72 -3,945.08 5,950,914.07 373,656.76 0.00 -3,945.08 10,100.00 67.00 211.00 5,523.83 5,468.53 -6,644.62 -3,992.49 5,950,835.95 373,608.08 0.00 -3,992.49 10,200.00 67.00 211.00 5,562.90 5,507.60 -6,723.53 -4,039.90 5,950,757.84 373,559.39 0.00 -4,039.90 10,300.00 67.00 211.00 5,601.97 5,546.67 -6,802.43 -4,087.31 5,950,679.72 373,510.71 0.00 -4,087.31 10,400.00 67.00 211.00 5,641.05 5,585.75 -6,881.33 -4,134.72 5,950,601.61 373,462.03 0.00 -4,134.72 10,500.00 67.00 211.00 5,680.12 5,624.82 -6,960.23 -4,182.13 5,950,523.49 373,413.35 0.00 -4,182.13 10,600.00 67.00 211.00 5,719.19 5,663.89 -7,039.14 -4,229.54 5,950,445.38 373,364.66 0.00 -4,229.54 10,700.00 67.00 211.00 5,758.27 5,702.97 -7,118.04 -4,276.95 5,950,367.26 373,315.98 0.00 -4,276.95 10,800.00 67.00 211.00 5,797.34 5,742.04 -7,196.94 -4,324.36 5,950,289.15 373,267.30 0.00 -4,324.36 10,900.00 67.00 211.00 5,836.41 5,781.11 -7,275.84 -4,371.77 5,950,211.04 373,218.61 0.00 -4,371.77 11,000.00 67.00 211.00 5,875.49 5,820.19 -7,354.75 -4,419.18 5,950,132.92 373,169.93 0.00 -4,419.18 8/17/2010 2:30:01PM Page 6 COMPASS 2003.16 Build 69 ORIGINAL ■.. • 0 Conoco Phillips I-IALLIBURTOriJ Standard Proposal Report Dat.abae:. EDM v16 Prod , rt.oda100-& - d41,1.6 1 Refeirerice0 : Well Plan: CD4-25 6 V- ConocoPhillips(Alaska) Inc. TiiD ikefeienaglk:. :'' Plan: 36.3+19 @ 55.30ft (Doyon 19) .., ' Western North Slope - -Boil , .!§teren - 9111$11 - : ::: : ... : . ::H . _§:: - 71„„ 1 :0„10; Plan: 36.3+19 @ 55.30ft (Doyon 19) SIlie.'.::::' .!! CD4 Nanuq Pad -: -:: True Mtell:H: 'J.-1 -.. Plan: CD4-25 :]-5100.0alcuitidiO40irct_ '..: Minimum Curvature Welli:Jore::: Plan: CD4-25 10,,,isign:: CD4-25wp12 Planned .!;..!!!!:!!!!!: Measured . '.. - -- --- - ' - ' . Vertic4 i i_ "11:::,'' :.'. I 11!!H ::]-ez=" . ' -- 011 4P . ::H: 1 -- - -- ''.1._ ..... '!!! ,1 1:!;!.rfir,1 1 ' --- .. :.. Depth' ' Inclination Azimuth DOO:irgil +N/-S _ii..: 404W NO ' ' ' - 1111 1 1#0 :..:..- ::-=-:. : E'Slin0 H:" : DES--. Vert Section ---:: (fk) :---: ;-_: . (!):':. ---:E:: (1:H:'H::: --MO VIA". ft _ __ ]::,_11! .:.:: .: - ]:]]]]=(fi) inibi,,. --:=:- . ..(ft) _H_]:..:::....5,86;i6 -- ----- - ]1101111:,. .......': -' "" _ 11,100.00 67.00 211.00 5,914.56 5,859.26 -7,433.65 -4,466.59 5,950,054.81 373,121.25 0.00 -4,466.59 11,200.00 67.00 211.00 5,953.63 5,898.33 -7,512.55 -4,514.00 5,949,976.69 373,072.57 0.00 -4,514.00 11,300.00 67.00 211.00 5,992.71 5,937.41 -7,591.45 -4,561.41 5,949,898.58 373,023.88 0.00 -4,561.41 11,400.00 67.00 211.00 6,031.78 5,976.48 -7,670.36 -4,608.82 5,949,820.46 372,975.20 0.00 -4,608.82 11,500.00 67.00 211.00 6,070.85 6,015.55 -7,749.26 -4,656.23 5,949,742.35 372,926.52 0.00 -4,656.23 11,600.00 67.00 211.00 6,109.92 6,054.62 -7,828.16 -4,703.63 5,949,664.23 372,877.84 0.00 -4,703.63 11,700.00 67.00 211.00 6,149.00 6,093.70 -7,907.07 -4,751.04 5,949,586.12 372,829.15 0.00 -4,751.04 11,702.57 67.00 211.00 6,150.00 6,094.70 -7,909.09 -4,752.26 5,949,584.12 372,827.90 0.00 -4,752.26 Start DLS 3.00 TFO 96.93 . ... 11,800.00 66.68 214.16 6,188.33 6,133.03 -7,984.56 -4,800.49 5,949,509.44 372,778.46 . . . 3.00 -4,796.26 11,870.37 66.49 216.45 6,216.30 6,161.00 -8,037.26 -4,837.80 5,949,457.37 372,740.29 3.00 -4,825.27 .. ... _ HHAlbian 96.:.H ,':!':''''' , . _ 1 i ,bo.clo 66.42 217.42 6,228.14 6,172.84 -8,u58.97 -4,854.12 5,949,435.93 372,723.62 3.00 -4,836.77 12,000.00 66.22 220.69 6,268.31 6,213.01 -8,130.07 -4,911.81 5,949,365.77 372,664.79 3.00 -4,872.47 12,100.00 66.09 223.96 6,308.75 6,253.45 -8,197.69 -4,973.39 5,949,299.18 372,602.13 3.00 -4,903.26 12,200.00 66.04 227.25 6,349.33 6,294.03 -8,261.62 -5,038.68 5,949,236.32 372,535.81 3.00 -4,929.06 12,300.00 66.05 230.53 6,389.94 6,334.64 -8,321.70 -5,107.52 5,949,177.37 372,466.01 3.00 -4,949.79 12,400.00 66.13 233.81 6,430.48 6,375.18 -8,377.76 -5,179.71 5,949,122.50 372,392.92 3.00 -4,965.39 12,500.00 66.28 237.08 6,470.83 6,415.53 -8,429.65 -5,255.06 5,949,071.85 372,316.75 3.00 -4,975.84 12,600.00 66.51 240.35 6,510.88 6,455.58 -8,477.22 -5,333.36 5,949,025.56 372,237.69 3.00 -4,981.08 12,700.00 66.79 243.60 6,550.52 6,495.22 -8,520.35 -5,414.39 5,948,983.76 372,155.98 3.00 -4,981.12 12,800.00 67.15 246.84 6,589.65 6,534.35 -8,558.91 -5,497.93 5,948,946.56 372,071.82 3.00 -4,975.95 12,900.00 67.57 250.06 6,628.16 6,572.86 -8,592.81 -5,583.76 5,948,914.07 371,985.46 3.00 -4,965.58 13,000.00 68.05 253.25 6,665.93 6,610.63 -8,621.94 -5,671.63 5,948,886.37 371,897.13 3.00 -4,950.05 13,100.00 68.60 256.43 6,702.87 6,647.57 -8,646.23 -5,761.32 5,948,863.55 371,807.08 3.00 -4,929.40 13,200.00 69.20 259.58 6,738.88 6,683.58 -8,665.62 -5,852.56 5,948,845.65 371,715.54 3.00 -4,903.67 13,300.00 69.86 262.70 6,773.86 6,718.56 -8,680.04 -5,945.11 5,948,832.74 371,622.77 3.00 -4,872.96 13,400.00 70.58 265.80 6,807.70 6,752.40 -8,689.46 -6,038.73 5,948,824.84 371,529.02 3.00 -4,837.33 13,500.00 71.35 268.87 6,840.33 6,785.03 -8,693.85 -6,133.14 5,948,821.98 371,434.56 3.00 -4,796.88 13,600.00 72.16 271.91 6,871.64 6,816.34 -8,693.21 -6,228.10 5,948,824.17 371,339.63 3.00 -4,751.73 13,603.13 72.19 272.00 6,872.60 6,817.30 -8,693.11 -6,231.07 5,948,824.32 371,336.66 3.00 -4,750.24 Start DLS 1.60.TFO161,41 13,700.00 72.43 273.61 6,902.04 6,846.74 -8,688.59 -6,323.25 5,948,830.34 371,244.57 1.60 -4,702.98 13,800.00 72.69 275.27 6,932.01 6,876.71 -8,681.20 -6,418.36 5,948,839.27 371,149.60 1.60 -4,651.81 13,844.80 72.81 276.01 6,945.30 6,890.00 -8,677.00 -6,460.94 5,948,844.16 371,107.10 1.60 -4,628.11 Hn 13,900.00 72.96 276.92 6,961.54 6,906.24 -8,671.06 -6,513.36 5,948,850.95 371,054.79 :1.60 -4,598.26 14,000.00 73.25 278.57 6,990.61 6,935.31 -8,658.17 -6,608.17 5,948,865.39 370,960.21 ''46 -4,542.36 14,100.00 73.55 280.21 7,019.18 6,963.88 -8,642.54 -6,702.71 5,948,882.55 370,865.94 1.60 -4,484.17 14,200.00 73.86 281.85 7,047.24 6,991.94 -8,624.17 -6,796.92 5,948,902.44 370,772.06 :.1k6o -4,423.74 14,300.00 74.19 283.48 7,074.77 7,019.47 -8,603.10 -6,890.71 5,948,925.04 370,678.62 .1,60 -4,361.09 14,309.29 74.22 283.63 7,077.30 7,022.00 -8,601.00 -6,899.40 5,948,927.28 370,669.97 .:1A0.. -4,355.16 P0. 14,393.48 74.50 285.00 7,100.00 7,044.70 -8,580.96 -6,977.95 5,948,948.60 370,591.76 1.60 -4,300.59 Start DLS 3.50 TFO 91.18 :H:::_:!-_____-_'''HT 8117/2010 2:30:01PM Page 7 COMPASS 2003.16 Build 69 ORIGINAL • • ConocoPhillips Standard Proposal Report Dompa Co M v1 6 Prod I ( j , ' 81 - L ocal l lll C l i or RefeMnce @ (Doyon - Y 19) Alaska Inc. TVD Reference P - Well Plan: CD4 25 y Ian: Project I 36.3 +19 55.30ft Do on 19 I °I ' : Western North Slope VIII D Refe ° Merne. c „ Plan: 36.3 +19 @ 55.30ft (Doyon 19) Site`. i91II CD4 Nanuq Pad North Refe e nce True g ul l 'Well 'iII�III Il' Plan* CD4 -25 Survey Calq Na.idn Method Minimum Curvature I Wellhore dllllll Plan CD4 -25 IIlIl9ll D gn 111 _- p -. tlllllllII _ -_ Il�lu II I CD4 -25w 1 llmr:- wll:' . l i l l V 111111 11111 = PI',ap'ned survey llllllu 11 9111IIIIIIII' Measured I Map Map � III I IIII I II1i1111,1 il l iIIIIII th + + - _ 'Northin I Eastin DLS Vert Section-- � Depth tnelmation Azur ©ep TVt?ss' .- N1S I . E! W g � I,,,I, ) (''' : .ulll IiV IIIgIIIIIItlIIIIVIuV IIII ft ;I P l iill 046 ft l I,� ' ) i {� ft IiIIIIIIIII �R� I I�IjIIllllllill�ftj � � I I IIIIIIIIIIIIliIl41 (ft) 7. I 14,400.00 74.50 285.24 7,101.74 7,046.44 -8,579.32 -6,984.02 5,948,950.33 370,585.72 3.50 - 4,296.29 14,500.00 74.46 288.87 7,128.52 7,073.22 - 8,551.07 - 7,076.12 5,948,980.08 370,494.11 3.50 - 4,228.11 14,543.98 74.46 290.47 7,140.30 7,085.00 - 8,536.81 - 7,116.02 5,948,994.98 370,454.45 3.50 - 4,196.79 K-1' Marke' 14,600.00 74.48 292.50 7,155.30 7,100.00 - 8,517.04 - 7,166.24 5,949,015.56 370,404.56 3.50 - 4,155.76 14,700.00 74.56 296.13 7,182.00 7,126.70 - 8,477.36 - 7,254.04 5,949,056.66 370,317.42 3.50 - 4,079.50 14,800.00 74.70 299.76 7,208.52 7,153.22 - 8,432.18 - 7,339.20 5,949,103.21 370,233.01 3.50 - 3,999.63 14,844.76 74.78 301.38 7,220.30 7,165.00 - 8,410.22 - 7,376.38 5,949,125.78 370,196.20 3.50 - 3,962.78 Kuparuk Fm ' 14,863.83 74.82 302.07 7,225.30 7,170.00 - 8,400.55 - 7,392.03 5,949,1 370,180.70 3.50 - 3,946.89 '' 'LCU- Miluveach 14,900.00 74.90 303.38 7,234.75 7,179.45 - 8,381.67 - 7,421.40 5,949,155.05 370,151.65 3 - 3,916.44 15,000.00 75.15 306.99 7,260.60 7,205.30 - 8,326.01 - 7,500.34 5,949,211.99 370,073.63 3.50 - 3,830.24 15,100.00 75.46 310.60 7,285.97 7,230.67 - 8,265.41 - 7,575.71 5,949,273.80 369,999.26 3.50 - 3,741.35 15,200.00 75.83 314.19 7,310.77 7,255.47 - 8,200.11 - 7,647.25 5,949,340.25 369,928.81 3.50 - 3,650.10 15,241.23 76.00 315.67 7,320.80 7,265.50 - 8,171.86 - 7,675.56 5,949,368.95 369,900.96 3.50 - 3,611.87 Start 311.09 hold.at 15241.23 MD 15,300.00 76.00 315.67 7,335.02 7,279.72 - 8,131.06 - 7,715.40 5,949,410.39 369,861.80 0.00 - 3,557.15 15,400.00 76.00 315.67 7,359.22 7,303.92 - 8,061.66 - 7,783.20 5,949,480.88 369,795.14 0.00 - 3,464.03 15,500.00 76.00 315.67 7,383.42 7,328.12 - 7,992.25 - 7,851.00 5,949,551.38 369,728.48 0.00 - 3,370.92 15,552.32 76.00 315.67 7,396.08 7,340.78 - 7,955.94 - 7,886.47 5,949,588.26 369,693.60 0.00 - 3,322.20 ----- Start,DLS 3.50 TFO 54.59 '' ' -` - -- 15,600.00 76.97 317.07 7,407.22 7,351.92 - 7,922.38 - 7,918.46 5,949,622.33 369,662.17 3.50 - 3,277.56 15,700.00 79.03 319.96 7,428.02 7,372.72 - 7,849.11 - 7,983.24 5,949,696.63 369,598.60 3.50 - 3,182.45 15,800.00 81.11 322.81 7,445.27 7,389.97 - 7,772.16 - 8,044.69 5,949,774.58 369,538.41 3.50 - 3,085.65 15,889.58 83.00 325.34 7,457.65 7,402.35 - 7,700.31 - 8,096.74 5,949,847.25 369,487.54 3.50 - 2,997.79 I ' _ Start Turn 3 - •_ - .. 15,900.00 83.00 325.71 7,458.92 7,403.62 - 7,691.79 - 8,102.59 5,949,855.86 369,481.83 3.50 - 2,987.51 15,985.05 82.99 328.71 7,469.30 7,414.00 - 7,620.84 - 8,148.31 5,949,927.55 369,437.28 3.50 - 2,903.40 "Alpine D , - 16,000.00 82.99 329.24 7,471.12 7,415.82 - 7,608.12 - 8,155.95 5,949,940.38 369,429.84 3.50 - 2,888.59 16,075.22 83.00 331.89 7,480.30 7,425.00 - 7,543.11 - 8,192.64 5,950,005.98 369,394.22 3.50 - 2,813.96 Start 748.34 hold at 1''6075.22 MD - -- I 16,083.42 83.00 331.89 7,481.30 7,426.00 - 7,535.93 - 8,196.48 5,950,013.22 369,390.50 0.00 - 2,805.82 Alpine C _, - 16,100.00 83.00 331.89 7,483.32 7,428.02 - 7,521.41 - 8,204.23 5,950,027.86 369,382.98 0.00 - 2,789.36 16,181.89 83.00 331.89 7,493.30 7,438.00 - 7,449.72 - 8,242.53 5,950,100.16 369,345.86 0.00 - 2,708.08 - UJU - _ - 16,200.00 83.00 331.89 7,495.51 7,440.21 - 7,433.87 - 8,250.99 5,950,116.15 369,337.65 0.00 - 2,690.11 16,300.00 83.00 331.89 7,507.69 7,452.39 - 7,346.32 - 8,297.76 5,950,204.44 369,292.32 0.00 - 2,590.85 16,400.00 83.00 331.89 7,519.88 7,464.58 - 7,258.77 - 8,344.53 5,950,292.73 369,246.99 0.00 - 2,491.60 16,500.00 83.00 331.89 7,532.07 7,476.77 - 7,171.23 - 8,391.29 5,950,381.01 369,201.66 0.00 - 2,392.35 16,600.00 83.00 331.89 7,544.25 7,488.95 - 7,083.68 - 8,438.06 5,950,469.30 369,156.33 0.00 - 2,293.09 16,700.00 83.00 331.89 7,556.44 7,501.14 - 6,996.13 - 8,484.82 5,950,557.59 369,111.00 0.00 - 2,193.84 16,800.00 83.00 331.89 7,568.63 7,513.33 - 6,908.59 - 8,531.59 5,950,645.88 369,065.67 0.00 - 2,094.58 8/17/2010 2:30:01PM Page 8 COMPASS 2003.16 Build 69 ORIGINAL • • ConocoPhillips HALLIEURTON Standard Proposal Report Local ca- or Reference , "' I - _. D - - 8 Conoco Pr s A Inc. ulll a l Well Plan: CD4-25 ( y ) D EDM v16 Prof TVD' of e rence 1 11 Plan: 36.3 +19 55.30ft Do on 19) Western North Slope MD Referen � ''"!!!!'!!!!!!!!!:!p Plan: 36.3+19 . 3 +19 @ 55.30ft (Doyon 19) ' Site CD4 Nanuq Pad Nor.! e fe r ence : ` True Well: l Plan: CD4-25 Survey C Method Minimum Curvature 1 Weltbore: Plan: CD4 -25 ulV11V91I1vI111::1 , !Design: I CD4- 25wp12 .. 111 m r 1,1,, - <- _, „ ,,.. uuuuuuui ui ,1111 i ,,:I .. uii ,,, -, . Planned Survey of gull l I Measured ll i 9111illplllilllllll Verticah ` Illllllllll ! M a p. Map III;�IIIII4 :IIIIIIjIII IIlI 11 - I I De th _ + + N Eason Il .Section. - In Azimuth) . , p -- T1/D�ull� ` ` I lilll6lll Depth Nr- Er W 9 S .51620 DI:S � ►�,.. (ft) ° () ° ( ) 1)1 (ft) ft 1 luu it 11 (ft} i llll �( l€til i l lli l l l l 1 p (ft} ' 7..11))1 Ill11i'j11 16,823.56 83.00 331.89 7,571.50 7,516.20 - 6,887.96 - 8,542.61 5,950,666.68 369,054.99 0.00 - 2,071.20 Start DLS3.38 TFO 0.00 16,900.00 85.59 331.89 7,579.10 7,523.80 - 6,820.88 - 8,578.44 5,950,734.33 369,020.25 3.38 - 1,995.14 16,912.26 86.00 331.89 7,580.00 7,524.70 - 6,810.10 - 8,584.20 5,950,745.21 369,014.67 3.38 - 1,982.92 Start 118,99 hold at 16912.26 MD 16,930.89 86.00 331.89 7,581.30 7,526.00 - 6, - 8,592.96 5,950,761.74 369,006.18 0.00 - 1,964.33 B3 sand 17,000.00 86.00 331.89 7,586.12 7,530.82 - 6,732.89 - 8,625.44 5,950,823.07 368,974.69 0.00 - 1,895.39 1 17,031.24 86.00 331.89 7,588.30 7,533.00 - 6,705.40 - 8,640.12 5,950,850.79 368,960.46 0.00 - 1,864.23 Start 30.00 hold at 17031.24 MD - Alpine:* Sand ..Z5187 !!!X 9 -T1W - - 17,061.24 86.00 331.89 7,590.39 7,535.09 - 6,679.00 - 8,654.22 5,950,877.41 368,946.79 0.00 - 1,834.30 Start Build 3.00 17,100.00 87.16 331.89 7,592.70 7,537.40 - 6,644.88 - 8,672.45 5,950,911.82 368,929.12 3.00 - 1,795.61 17,194.57 90.00 331.89 7,595.05 7,539.75 - 6,561.49 - 8,716.99 5,950,995.91 368,885.94 3.00 - 1,701.07 Start Build 3.00 17,200.00 90.16 331.89 7,595.04 7,539.74 - 6,556.71 - 8,719.55 5,951,000.74 368,883.47 3.00 - 1,695.65 17,249.91 91.66 331.89 7,594.24 7,538.94 - 6,512.69 - 8,743.06 5,951,045.13 368,860.68 3.00 - 1,645.75 Start 330.14 hold at 17249.91 MD . 17,300.00 91.66 331.89 7,592.79 7,537.49 - 6,468.53 - 8,766.65 5,951,089.67 368,837.81 0.00 - 1,595.68 17,400.00 91.66 331.89 7,589.90 7,534.60 - 6,380.36 - 8,813.75 5,951,178.58 368,792.15 0.00 - 1,495.72 17,500.00 91.66 331.89 7,587.00 7,531.70 - 6,292.19 - 8,860.85 5,951,267.50 368,746.50 0.00 - 1,395.76 17,580.04 91.66 331.89 7,584.68 7,529.38 - 6,221.62 - 8,898.55 5,951,338.67 368,709.96 0.00 - 1,315.75 Start DLS 3.00 TFO - 179.74 - 17,600.00 91.06 331.89 7,584.21 7,528.91 - 6,204.02 - 8,907.95 5,951,356.41 368,700.85 3.00 - 1,295.80 17,621.35 90.42 331.89 7,583.93 7,528.63 - 6,185.20 - 8,918.00 5,951,375.40 368,691.10 3.00 - 1,274.45 Start 3897.80 hold at 17621.35 MD _ 17,700.00 90.42 331.89 7,583.35 7,528.05 - 6,115.82 - 8,955.06 5,951,445.36 368,655.18 0.00 - 1,195.80 17,800.00 90.42 331.89 7,582.62 7,527.32 - 6,027.62 - 9,002.18 5,951,534.31 368,609.51 0.00 - 1,095.81 17,900.00 90.42 331.89 7,581.88 7,526.58 - 5,939.42 - 9,049.29 5,951,623.26 368,563.83 0.00 - 995.81 18,000.00 90.42 331.89 7,581.15 7,525.85 - 5,851.22 - 9,096.41 5,951,712.21 368,518.16 0.00 - 895.81 18,100.00 90.42 331.89 7,580.42 7,525.12 - 5,763.02 - 9,143.53 5,951,801.16 368,472.49 0.00 - 795.82 18,200.00 90.42 331.89 7,579.68 7,524.38 - 5,674.82 - 9,190.64 5,951,890.11 368,426.82 0.00 - 695.82 18,300.00 90.42 331.89 7,578.95 7,523.65 - 5,586.61 - 9,237.76 5,951,979.05 368,381.15 0.00 - 595.82 18,400.00 90.42 331.89 7,578.21 7,522.91 - 5,498.41 - 9,284.88 5,952,068.00 368,335.48 0.00 - 495.82 1 18,500.00 90.42 331.89 7,577.48 7,522.18 - 5,410.21 - 9,331.99 5,952,156.95 368,289.81 0.00 - 395.83 18,600.00 90.42 331.89 7,576.74 7,521.44 - 5,322.01 - 9,379.11 5,952,245.90 368,244.13 0.00 - 295.83 18,700.00 90.42 331.89 7,576.01 7,520.71 - 5,233.81 - 9,426.23 5,952,334.85 368,198.46 0.00 - 195.83 18,800.00 90.42 331.89 7,575.27 7,519.97 - 5,145.61 - 9,473.34 5,952,423.80 368,152.79 0.00 -95.84 18,900.00 90.42 331.89 7,574.54 7,519.24 - 5,057.41 - 9,520.46 5,952,512.75 368,107.12 0.00 4.16 19,000.00 90.42 331.89 7,573.81 7,518.51 - 4,969.20 - 9,567.58 5,952,601.70 368,061.45 0.00 104.16 19,100.00 90.42 331.89 7,573.07 7,517.77 - 4,881.00 - 9,614.69 5,952,690.65 368,015.78 0.00 204.15 19,200.00 90.42 331.89 7,572.34 7,517.04 - 4,792.80 - 9,661.81 5,952,779.60 367,970.10 0.00 304.15 19,300.00 90.42 331.89 7,571.60 7,516.30 - 4,704.60 - 9,708.92 5,952,868.54 367,924.43 0.00 404.15 19,400.00 90.42 331.89 7,570.87 7,515.57 - 4,616.40 - 9,756.04 5,952,957.49 367,878.76 0.00 504.15 19,500.00 90.42 331.89 7,570.13 7,514.83 - 4,528.20 - 9,803.16 5,953,046.44 367,833.09 0.00 604.14 8/17/2010 2:30:01PM Page 9 COMPASS 2003.16 Build 69 ORIGINAL • • ConocoPhillips HALLIBURTON Standard Proposal Report , „ „ .. „ ...,.___,....-- 7 --------- --,..""'7""' !-- %.". '." '! " ' "' "!" '," ' -, , .:.„-... , . - .7 ' . ' ... - -- -- - -- 7"" 77, '" - - ■ ■ ■ 611.1 DD. R: Reefefre:it tic : _..:,„ _,....,.,:,. 1.:.b1:.1,,1,11111,1.:1::.____.,::.:. ,, ;:::::::::::::.:-!•'!::::!:::• ! ..:::!::!: .-------- Database: EDM v16 Prod - -_ - . - -Lbcal.0001:dinite''Ettiferitrit. --,-.--..-- Well Plan: CD4-25 Company: : '' !---...: ConocoPhillips(Alaska) Inc. Plan 36 3+19 @ 55.30ft (Doyon 19) ---,_:, ! ! --•,-_ !!! .-----..-...:•:•!!::!-...::.::::::::!:::::,):::1 • • . Plan: 36.3+19 @ 55.30ft (Doyon 19) Project; --,:=-_-_._...,::',.:::::::-.: Western North Slope ,.--- .!!!' !:".", .pp:. ... __---;-::,.... L. ...-:::-, CD4 Nanuq Pad - -_ - - - -kiciittcRefirince:::::!:::::liwilli l ...._ !:::::::::::::::::::::!:::.::: _ __ - .k.::!:,.,....:::::!:::'i:iiinill - • !!!)0(itt -.-- Plan: CD4-25 !., Suivey-CitcullatkirilillithOOt''!.'!'!!'!!!!!!!!!!!!!!!: Minimum Curvature 4:tlidOiet:::!! -_- Plan: CD4-25 --.---,-- ::::. ,_-_--__-_-__-_-,:::::::_-___,,:i!,!!!:!,!!!!!.."-...----•-_---_-_"'"'''::!!!!Ill'il :,!::...:--• ..: .::::-____-_ ..: ..---_-_-_-•-•-•-•-•,-_-•,!!!:!::::: :_-_:-_-_-_-_---- ..:!.!!Ily!:11: : Design: :!!!::::!':,:'::'::::'.!::. CD4-25wp12 "-:...::.:::!:,.,_-_-_:„.:!::!„ ::!,!1:!::'':',:"::::'..:::•: ----------::::•::--:::::::::::::::::::::::::::::: - ..-. !:!:-........!!! : - --=--_- ! : • . - --- :::!,,!:!,:::::::::::::::::::::::::::::::::::: :: .:!!!!!!!!!!:!,:".:1!"::::!:' :!:: : !: - ------- : : . - ----------...::::::.:::':::::::.:: !!"p!ilitiied! !!!!!!!!!!!!!!!!!!!!!!:!•!"!!:!!!:!!!.!:•!-'!!!:::!'.'!::':!!::!..! -_-_ --_-_--_-_------. '"!'!!!!!!!!!!!!!: :!!!!!!!!!ill!!!!!!!!!!! ... : !.:.... .. " " ! -""-:__--,---,-----_---_; - !!!!!!'i'''''! - ;::'!! _"-_-__--_-]----]--:•-: i!!!!!!!!!!!!!!!!!!!!!!!!!!!!:!.! ' ':::' : ' ' _-_-__T : li!::::'::!:!::: iiiieatited:: ----------'-------- ' 1 . 'H. L i ''..HY'ertical -_1-_ - .. --- _ - zzliA6111111 :: N'..!$*:'- .'':':: -- --- --_-_--_-__ .. Maiy , .'...,'' :----_---_--:::_ '.10.Ma17$1110.;.':'-.1'41010t/ .„. Depth Inclination Azttitutt1:'!!!.!!:!!''!'OpPth. :. TVDsii . . r - - --,: Northing ' !:: -- -iiiii - -__ - i:,Eisiit)0! ! ' L S yot Section -- -_ - ,f (ft) (ft) IV- ' ' (*)-------.!---!!!!!:!!!!:!:!::!'!'!:!'! ::hH: -- . (tt)--:: . - 1: - - -- - -- -- - -- - i,__.'(..ftr ! :::::: 1 19,600.00 90.42 331.89 7,569.40 7,514.10 -4,439.99 -9,850.27 5,953,135.39 367,787.42 0.00 704.14 19,700.00 90.42 331.89 7,568.67 7,513.37 -4,351.79 -9,897.39 5,953,224.34 367,741.75 0.00 804.14 19,800.00 90.42 331.89 7,567.93 7,512.63 -4,263.59 -9,944.51 5,953,313.29 367,696.08 0.00 904.13 19,900.00 90.42 331.89 7,567.20 7,511.90 -4,175.39 -9,991.62 5,953,402.24 367,650.40 0.00 1,004.13 20,000.00 90.42 331.89 7,566.46 7,511.16 -4,087.19 -10,038.74 5,953,491.19 367,604.73 0.00 1,104.13 20,100.00 90.42 331.89 7,565.73 7,510.43 -3,998.99 -10,085.86 5,953,580.14 367,559.06 0.00 1,204.13 20,200.00 90.42 331.89 7,564.99 7,509.69 -3,910.79 -10,132.97 5,953,669.08 367,513.39 0.00 1,304.12 20,300.00 90.42 331.89 7,564.26 7,508.96 -3,822.58 -10,180.09 5,953,758.03 367,467.72 0.00 1,404.12 20,400.00 90.42 331.89 7,563.53 7,508.23 -3,734.38 -10,227.20 5,953,846.98 367,422.05 0.00 1,504.12 20,500.00 90.42 331.89 7,562.79 7,507.49 -3,646.18 -10,274.32 5,953,935.93 367,376.37 0.00 1,604.11 20,600.00 90.42 331.89 7,562.06 7,506.76 -3,557.98 -10,321.44 5,954,024.88 367,330.70 0.00 1,704.11 20,700.00 90.42 331.89 7,561.32 7,506.02 -3,469.78 -10,368.55 5,954,113.83 367,285.03 0.00 1,804.11 20,800.00 90.42 331.89 7,560.59 7,505.29 -3,381.58 -10,415.67 5,954,202.78 367,239.36 0.00 1,904.11 20,900.00 90.42 331.89 7,559.85 7,504.55 -3,293.38 -10,462.79 5,954,291.73 367,193.69 0.00 2,004.10 21,000.00 90.42 331.89 7,559.12 7,503.82 -3,205.17 -10,509.90 5,954,380.68 367,148.02 0.00 2,104.10 21,100.00 90.42 331.89 7,558.39 7,503.09 -3,116.97 -10,557.02 5,954,469.62 367,102.35 0.00 2,204.10 21,200.00 90.42 331.89 7,557.65 7,502.35 -3,028.77 -10,604.14 5,954,558.57 367,056.67 0.00 2,304.09 21,300.00 90.42 331.89 7,556.92 7,501.62 -2,940.57 -10,651.25 5,954,647.52 367,011.00 0.00 2,404.09 21,400.00 90.42 331.89 7,556.18 7,500.88 -2,852.37 -10,698.37 5,954,736.47 366,965.33 0.00 2,504.09 21,500.00 90.42 331.89 7,555.45 7,500.15 -2,764.17 -10,745.49 5,954,825.42 366,919.66 0.00 2,604.09 ---- 21,519.15 90.42 331.89 7,555.31 - 7,500.01 -2,747.28 -10,754.51 5,954,842.45 366,910.91 0.00 2,623.24 . ..,: TD it 21519.15.-- 4-1/2" x 6-3/4" . . . 21,520.12 90.42 331.89 7,555.30 7,500.00 -2,746.42 -10,754.96 5,954,843.32 366,910.47 0.00 2,6 0D4451 To *,iigitiii::''':...'.:!..'::.:. . •. . _!!!!!!!!,,,!!!':!' ::!:' !!! _' '. ! !!_-_,-."."---."--",_!!!!!!!_,•!•!!:':!:!'!!!:'!::!:!:!:'!:::!!!.!:'':-"_•-•:-.;__ -__-_!__-"!_!;!' __ _--=' ":..: ' _ - 1 : ":"'":":-- .--S.,-.:.. __, ::. - - -_-_-_ - •. - r - : - '.. !".''': ' _-_-_-_ 11:P!"ilr!:" 0.':.. ..:..!. ..'.:. :: - -_-17N(4§0: , :!1!1:.'::: -, :*FIA'At.r= Northing :::::-: tasting ;Vgiii*.-.: r- ..:.i.)-_-_ :...'' ' -- -:: : : : ::: : :::::::-Aiti _ ..H.:(ft) .-- .1=-!' , . ".! - ---- '-'ii - - - ... r ------- ;g....:' - . -- -: - -. , ....:'. ::::- .'....:: .::::E Interp @ 7425.00 (Plan: CD4-25 Plan: CD4-25 0.00 7,480.30 -7,542.40 -8,193.29 5,950,006.70 369,393.58 - plan 'hits :target center - Point CD4-25wp07 Toe 0.00 0.00 7,555.30 -2,746.42 -10,754.96 5,954,843.32 366,910.47 - plan hits target center ! - Point .: ---. !!!!!4st!tta 1 1:,:.:„::..„.„--..: : : : .:,...", - :::!:!!!:::!..:. • ::! : : :!.....!!':::t:',...'::•tillt:',:: ....: ...:. ' ::.:"! :"-__--_-__-•-__ •..: :''' .!'''': -- = -4 ."' , - - - --- - -- - - - - _;.!:':!:!!.!! ! !! ! '.• -- - - - - -_ -- - - - -- - - -_ - , - - - ')!!!!!!!!!:!!!!!::::1 -. - - -_ -- .,-" - „:„±„,:i,„!`::,!,!!!!!!!!!!!!!!!!!!II!!!!0!!!!!....":4!!!!!!!!!!!II!!!!!!!!!!! . .2, Measured Vertical - - _". ::::::!:.:::!.!..-------;---- .::: ! ! - I I I ..:. .-_,.4T_. : ,.....,-,:„.: ,, ,,_-_,N•::!,:::! ::::!::!!::::::!!:!!:!!!!:,::::::::::::::::::::::;::::::::::.:!:.,:::! Lasing : . .--,-_-. ::00: -.- _,____' _________,:':iiiii!h„„:1111.11,!!:.'......'!.'.'..:::.. .____ ---'-- !_---=,-' .' ._____,;_f - •-_ DePt ! 1 ! ! ! ! !!!1!:!! !!!!!!!! !! !!!°! !!! ! ! ! ! !R'P Pell-------2-----i - it ' .-: '.''' .H.H.':::: "P' ' . 0 4 * 6 H -: ::'' - 2,972.64 2,400.00 10-3/4" x 13-1/2" 10-3/4 13-1/2 17,031.24 7,588.30 7-5/8" X 9-7/8" 7-5/8 9-7/8 21,519.15 7,555.31 4-1/2" x 6-3/4" 4-1/2 6-3/4 8/17/2010 2:30:01PM Page 10 COMPASS 2003.16 Build 69 ORIGINAL • • ConocoPhillips HALLIBURTON Standard Proposal Report Data u b a lll �s lllll : . EDM v16 Pro d 111111111111 " .Loc Co- ordinate Reference Well Plan luii iiC D4 1u11 2 11 `J 111, 1 e MII Compan _ : I, I !Ih ConocoPhillips(Alaska) Inc. TV III 'Reference: Plan: 36.3 +19 @ 55.30ft (Doyon 19) project; j' Western North Slope 1NDII�I�� eference; . Plan: 36.3 +19 @ 55.30ft (Doyon 19) II Site:'. -_ CD4 Nanuq Pad No hR'eference: True ` Welk Plan: CD4 -25 Survey Calculation IMiletitod: Minimum Curvature D align: CD4-25wp12 muuul 1 it ,' Deal n, P II I ., I II1111m, „„ 11.11 orr -_ _ -- _ -, Formations I _ I IIIi11II11VIII I IIIIIIIIII I I Ip ',II 1 r- __ IpIVV k Measured IIIIII V ertical Vertical l ! I 1II I ' lll IiII 9 Dip Depth I 1111 1 Depth Depth SS 1 1 1'III1 Il�q ' I pi p . Direct ft ft It 1,1111 I I I I , } - II II11 (ft} { ) IIII111 11 . Na , l.rt { ) 11,870.37 6,216.30 Albian 96 6,761.31 4,218.30 Basal K -2 16,181.89 7,493.30 UJU 14,543.98 7,140.30 K -1 Marker 6,511.51 4,111.30 K -2 Marker 16,083.42 7,481.30 Alpine C 13,844.80 6,945.30 HRZ 5,964.13 3,850.30 K -3 Marker 14,863.83 7,225.30 LCU- Miluveach 14,844.76 7,220.30 Kuparuk Fm 17,031.24 7,588.30 Alpine A Sand I 15,985.05 7,469.30 Alpine D 16,930.89 7,581.30 B3 sand 6,427.90 4,073.30 Basal K -3 14,309.29 7,077.30 Base HRZ 3,823.08 2,812.30 C -20 2,983.58 2,405.30 C -30 Plan t o notations Me V 111 1 11 V III I II Il 11 1 ' Local Coordinates 1 11 ' 1 11 I uI ' II111 1 i� 1 1h'� II 111 De Depth' VII'lu +N / +Ef 4NIII111i111! ' I '1 IIII 1 ., ft ft {ft i111 Cc>rnrrrenC ;',r ' II IIIi 1; wuu ._ , •••• .. '' 350.00 350.00 0.00 0.00 Start Build 2.00 903.44 900.00 -45.68 -27.45 Start DLS 3.00 TFO 0.00 2,567.81 2,203.73 - 858.63 - 515.92 Start 3705.10 hold at 2567.81 MD 6,272.91 4,000.00 - 3,636.32 - 2,184.92 Start DLS 1.00 TFO 0.00 6,872.91 4,262.90 - 4,098.36 - 2,462.54 Start 4829.66 hold at 6872.91 MD - 11,702.57 6,150.00 - 7,909.09 - 4,752.26 Start DLS 3.00 TFO 96.93 13,603.13 6,872.60 - 8,693.11 - 6,231.07 Start DLS 1.60 TFO 81.41 ' 14,393.48 7,100.00 - 8,580.96 - 6,977.95 Start DLS 3.50 TFO 91.18 15,241.23 7,320.80 - 8,171.86 - 7,675.56 Start 311.09 hold at 15241.23 MD 15,552.32 7,396.08 - 7,955.94 - 7,886.47 Start DLS 3.50 TFO 54.59 15,889.58 7,457.65 - 7,700.31 - 8,096.74 Start Turn 3.53 16,075.22 7,480.30 - 7,543.11 - 8,192.64 Start 748.34 hold at 16075.22 MD 16,823.56 7,571.50 - 6,887.96 - 8,542.61 Start DLS 3.38 TFO 0.00 16,912.26 7,580.00 - 6,810.10 - 8,584.20 Start 118.99 hold at 16912.26 MD 17,031.24 7,588.30 - 6,705.40 - 8,640.12 Start 30.00 hold at 17031.24 MD 17,061.24 7,590.39 - 6,679.00 - 8,654.22 Start Build 3.00 17,194.57 7,595.05 - 6,561.49 - 8,716.99 Start Build 3.00 ' 17,249.91 7,594.24 - 6,512.69 - 8,743.06 Start 330.14 hold at 17249.91 MD • 17,580.04 7,584.68 - 6,221.62 - 8,898.55 Start DLS 3.00 TFO - 179.74 1 17,621.35 7,583.93 - 6,185.20 - 8,918.00 Start 3897.80 hold at 17621.35 MD 21,519.15 7,555.31 - 2,747.27 - 10,754.51 TD at 21519.15 8/17/2010 2:30:01PM Page 11 COMPASS 2003.16 Build 69 ORIGINAL i i3 t _- ConocoPhillips(Alaska) Inc. -WNS LiE Western North Slope CD4 Nanuq Pad Plan: CD4 -25 Plan: CD4 -25 -- — - CD4- 25wp12 • u a Sperry Drilling Services R. Clearance Summary ' i Anticollision Report 17 August, 2010 t Tray. Cylinder North Proximity Scan on Current Survey Data (North Reference) Reference Design: CD4 Nanuq Pad - Plan: CD4 -25 - Plan: CD4 -25 - CD4- 25wp12 Well Coordinates: 5,957,161.34 N, 1,517,741.31 E (70° 17' 30.60" N, 150° 59' 35.58" W) Datum Height: Plan: 36.3 +19 @ 55.30ft (Doyon 19) Scan Range: 0.00 to 21,519.15 ft. Measured Depth. Scan Radius is 2,348.29 ft . Clearance Factor cutoff is Unlimited. Max Ellipse Separation is Unlimited A _ A Geodetic Scale Factor Applied I a t Version: 2003.16 Build: 69 - li Scan Type: GLOBAL FILTER APPLIED: All wellpaths within 200'+ 100/1000 of reference Scan Type: 25,00 30 a 0 J HALLIBURTON Sperry drilling Services GD ConocoPhillips(Alaska) Inc. -WNS HALLIBURTON Western North Slope Anticollision Report for Plan: CD4 -25 - CD4- 25wp12 Tray. Cylinder North Proximity Scan on Current Survey Data (North Reference) Reference Design: CD4 Nanuq Pad - Plan: CD4 -25 - Plan: CD4 -25 - CD4- 25wp12 Scan Range: 0.00 to 21,519.15 ft. Measured Depth. Scan Radius is 2,348.29 ft . Clearance Factor cutoff is Unlimited. Max Ellipse Separation is Unlimited Measured Minimum @Measured Ellipse @Measured Clearance Summary Based on _Site Name Depth Distance Depth Separation Depth Factor Minimum Separation Warning Comparison Well Name - Welibore Name - Design (ft) (ft) (ft) (ft) ft CD4 Nanuq Pad - • CD4 -05 - CD4 -05 - CD4 -05 757.56 396.44 757.56 381.96 800.00 27.390 Centre Distance Pass - Major Risk CD4 -05 - CD4-05 - CD4 -05 847.42 397.45 847.42 381.19 900.00 24.448 Clearance Factor Pass - Major Risk CD4 -16 - CD4 -16 - CD4 -16 539.21 174.09 539.21 163.85 550.00 16.995 Centre Distance Pass - Major Risk CD4 -16 - CD4 -16 - CD4 -16 586.40 174.61 586.40 163.49 600.00 15.697 Clearance Factor Pass - Major Risk CD4 -17 - CD4 -17 - CD4 -17 1,104.08 119.46 1,104.08 101.12 1,150.00 6.514 Centre Distance Pass - Major Risk CD4 -17 - CD4 -17 - CD4 -17 1,126.40 119.83 1,126.40 101.07 1,175.00 6.389 Clearance Factor Pass - Major Risk CD4 -210 - CD4 -210 - CD4 -210 1,456.38 285.19 1,456.38 259.43 1,575.00 11.069 Centre Distance Pass - Major Risk CD4 -210 - CD4 -210 - CD4 -210 1,478.55 285.21 1,478.55 259.23 1,600.00 10.977 Clearance Factor Pass - Major Risk CD4 -213 - CD4 -213 - CD4- 213wp06 73.65 239.88 73.65 238.35 75.00 156.408 Centre Distance Pass - Major Risk CD4 -213 - CD4 -213 - CD4- 213wp06 1,992.24 267.52 1,992.24 231.59 2,125.00 7.447 Clearance Factor Pass - Major Risk CD4 -213 - CD4 -213 - CD4 -213 73.65 239.88 73.65 238.35 75.00 156.408 Centre Distance Pass - Major Risk CD4 -213 - CD4 -213 - CD4 -213 1,992.24 267.52 1,992.24 231.59 2,125.00 7.447 Clearance Factor Pass - Major Risk CD4 -214 - CD4 -214 - CD4 -214 1,487.26 131.27 1,487.26 107.29 1,575.00 5.473 Clearance Factor Pass - Major Risk CD4 -215 - CD4 -215 - CD4 -215 1,350.85 133.86 1,350.85 110.44 1,425.00 5.716 Centre Distance Pass - Major Risk CD4 -215 - CD4 -215 - CD4 -215 1,373.33 134.08 1,373.33 110.33 1,450.00 5.644 Clearance Factor Pass - Major Risk CD4 -23 - CD4 -23 - CD4 -23 374.56 39.07 374.56 31.71 375.00 5.312 Centre Distance Pass - Major Risk CD4 -23 - CD4 -23 - CD4 -23 424.09 39.54 424.09 31.31 425.00 4.806 Clearance Factor Pass - Major Risk • CD4-23 - CD4 -23PB1 - CD4 -23PB1 374.56 39.07 374.56 31.71 375.00 5.312 Centre Distance Pass - Major Risk CD4 -23 - CD4 -23PB1 - CD4 -23PB1 424.09 39.54 424.09 31.31 425.00 4.806 Clearance Factor Pass - Major Risk CD4 -23 - CD4 -23PB2 - CD4 -23PB2 374.56 39.07 374.56 31.71 375.00 5.312 Centre Distance Pass - Major Risk CD4 -23 - CD4 -23PB2 - CD4 -23PB2 424.09 39.54 424.09 31.31 425.00 4.806 Clearance Factor Pass - Major Risk CD4 -24 - CD4 -24 - CD4 -24 36.30 20.12 36.30 19.10 36.90 19.898 Centre Distance Pass - Major Risk CD4 2 CD4-;24 !CD4-24 5 23146 . 2343 523.46 1347 525.00 2.354 Clearan Factor //""���� bass - Major Risk `a D CD4 -24 - CD4 -24PB1 - CD4 -24PB1 36.30 20.12 36.30 19.10 36.90 19.898 Centre Distance Pass - Major Risk X} 0134 -24 Cp4 -24PB1 = CD4 24PBL 523.46 23:43 523.46 13. 625,00 2.354 Clearance Factor Pass Major Risk ....� CD4 -24 - CD4 -24PB2 - CD4 -24PB2 36.30 20.12 36.30 19.10 36.90 19.898 Centre Distance Pass - Major Risk CD4 24_ *- Cq4 =24r B2 - CD4 2,4PB2 523 - off 23.43 523.46 13.47 525.011 2.354 Clearance Factor- Pas = Major-Risk CD4 -26 CD4-26 - CD4 -26 299.20 19.25 299.20 13.39 300.00 3.285 Centre Distance Pass - Major Risk 17 August, 2010 - 10:38 Page 2 of 6 COMPASS ConocoPhillips(Alaska) Inc. -WNS HALLEBURTON Western North Slope Anticollision Report for Plan: CD4 -25 - CD4- 25wp12 Tray. Cylinder North Proximity Scan on Current Survey Data (North Reference) Reference Design: CD4 Nanuq Pad - Plan: CD4 -25 - Plan: CD4 -25 - CD4- 25wp12 Scan Range: 0.00 to 21,519.15 ft. Measured Depth. Scan Radius is 2,348.29 ft . Clearance Factor cutoff is Unlimited. Max Ellipse Separation is Unlimited Measured Minimum @Measured Ellipse @Measured Clearance Summary Based on Site Name Depth Distance Depth Separation Depth Factor Minimum Separation Warning Comparison Well Name - Wellbore Name - Design (ft) (ft) (ft) (ft) ft CD42 z- CD4 26 Co4r26 399.44 20.24 399:44 1214 440.Q0 2.614 Clearance Factor Pass MajatRista CD4 -318 - CD4 -318 - CD4 -318 1,219.16 104.05 1,219.16 83.31 1,275.00 5.016 Centre Distance Pass - Major Risk • CD4 -318 - CD4 -318 - CD4 -318 1,241.91 104.37 1,241.91 83.05 1,300.00 4.896 Clearance Factor Pass - Major Risk CD4 -318 - CD4 -318A - CD4 -318A 1,218.21 104.06 1,218.21 83.23 1,275.00 4.996 Centre Distance Pass - Major Risk CD4 -318 - CD4 -318A - CD4 -318A 1,240.96 104.34 1,240.96 82.94 1,300.00 4.875 Clearance Factor Pass - Major Risk CD4 -318 - CD4- 318PB1 - CD4- 318PB1 1,219.16 104.05 1,219.16 83.15 1,275.00 4.979 Centre Distance Pass - Major Risk CD4 -318 - CD4- 318PB1 - CD4- 318PB1 1,241.91 104.37 1,241.91 82.90 1,300.00 4.861 Clearance Factor Pass - Major Risk CD4 -319 - CD4 -319 - CD4 -319 812.36 107.05 812.36 93.68 825.00 8.007 Centre Distance Pass - Major Risk CD4 -319 - CD4 -319 - CD4 -319 885.68 107.68 885.68 92.96 900.00 7.313 Clearance Factor Pass - Major Risk CD4 -320 - CD4 -320 - CD4 -320 445.49 98.40 445.49 89.82 450.00 11.471 Centre Distance Pass - Major Risk CD4 -320 - CD4 -320 - CD4 -320 493.80 98.94 493.80 89.52 500.00 10.496 Clearance Factor Pass - Major Risk CD4 -320 - CD4- 320PB1 - CD4- 320PB1 445.49 98.40 445.49 89.82 450.00 11.471 Centre Distance Pass - Major Risk CD4 -320 - CD4- 320PB1 - CD4- 320PB1 493.80 98.94 493.80 89.52 500.00 10.496 Clearance Factor Pass - Major Risk CD4 -321 - CD4 -321 - CD4 -321 910.49 55.17 910.49 39.50 925.00 3.520 Centre Distance Pass - Major Risk CD4 -321 - CD4 -321 - CD4 -321 934.15 55.19 934.15 39.15 950.00 3.442 Clearance Factor Pass - Major Risk CD4 -322 - CD4 -322 - CD4 -322 620.41 47.48 620.41 36.48 625.00 4.316 Centre Distance Pass - Major Risk CD4 -322 - CD4 -322 - CD4 -322 669.46 47.87 669.46 36.22 675.00 4.110 Clearance Factor Pass - Major Risk Nanuq 3 - Nanuq 3 - Nanuq 3 263.30 39.80 263.30 35.40 250.00 9.030 Centre Distance Pass - Major Risk Nanuq 3 - Nanuq 3 - Nanuq 3 439.17 41.26 439.17 34.14 425.00 5.797 Clearance Factor Pass - Major Risk -Nanuk Nanuk 2 - Nanukg- Nanuk 2 ..5,667:33 182.47 5;667.33 60.82 4,15000 -1,500 Centre Distance Pass - Major Risk Nanuk 2 Nanuk '2 ;!Nanuk 2 5,724,59 190,09 5,724.59 51.48 4,225.00 1.371 Clearance Factor Pass - Major Risk CD G, 17 August, 2010 - 10:38 Page 3 of 6 COMPASS r- ConocoPhillips(Alaska) Inc. -WNS HALT I URT N Western North Slope Anticollision Report for Plan: CD4 -25 - CD4- 25wp12 Survey tool program NOTE: gyro deeper than usual From To Survey /Plan Survey Tool (ft) (ft) ��� NOTE: gyrodata 36.30 - 13500Th CD4- 25wp12 GYDGC -SS < tool required 1,350.00 21,519.15 CD4- 25wp12 MWD +IFR- AK- CAZ -SC q Ellipse error terms are correlated across survey tool tie-on points. Calculated ellipses incorporate surface errors. Separation is the actual distance between ellipsoids. Distance Between centres is the straight line distance between wellbore centres. Clearance Factor = Distance Between Profiles / (Distance Between Profiles - Ellipse Separation). All station coordinates were calculated using the Minimum Curvature method. • 17 August, 2010 - 10:38 Page 4 of 6 COMPASS GLOBAL FILTER APPLIED: All wellpaths within 200'+ 100/1000 of reference SECTION DETAILS 10:51, August 17 2010 CD4- 25wp12 Sec MD Inc Azi ND .14/ -S r-E / -W DLeg TFace VSec Target - 1 36.30 0.00 0.00 36.30 0.00 0 00 0.00 0.00 0.00 36.30 To 21519.15 Ellipsoid Color 2 350.00 0.00 0.00 350.00 0.00 0.00 0.00 0.00 0.00 3 903.44 11.07 211.00 900.00 -45.68 -27.45 2.00 211.00 -27.45 4 2567.81 61 00 211.002203.73 - 858.63 - 515.92 3 00 0.00 - 515.92 �, �„ a e„ SURVEY PROGRAM 36 - - 250 1250 1500 3500 4250 9250 11750 19750 21250 5 6272.91 61.00 211.004000.00 - 3636.32 - 2184.92 0.00 0.00 - 2184.92 a ,35' z,5,5 coErilii=.11 w r=„cxsc 250 500 1500 -- - - - --- 1750 4250 -- - _ -__ -- 5250 11750 - 14250 21250 22250 6 6872.91 6700211.004262.90 -4098.36- 2462.54 1.00 0.00- 2462.54 - 7 11702.57 67.00 211.006150.00 - 7909.09 -4752.26 0.00 0.00 -4752.26 500 750 1750 2250 5250 6250 14250 16250 22250 23250 8 13603.13 72.19 272.006872.60 - 8693.11 - 6231.07 3.00 96.93 -4750.24 750 1000 2250 2750 6250 7750 16250 18250 23250 - ' 24000 9 14393.48 74.50 285 007100.00 -8580 96- 6977.95 1.60 81.41 -4300.59 10 15241.23 76.00315.677320.80 - 8171.86 - 7675.55 3.50 91.18 - 3611.87 1000 1250 2750 3500 7750 9250 16250 19750 24000 - 24500 11 15552.32 76.00 315.677396.08- 7955.94 - 7886.47 0.00 0.00- 3322.20 12 15889.58 83.00325.347457.65 - 7700.31 - 8096.74 3.50 54.59 - 2997.79 13 16075.22 83.00 331.897480.30- 7543.11 - 8192.64 3.50 90.40 - 2813.96 14 16823.56 83.00 331.897571 50 - 6887.96- 8542.61 0.00 0.00 - 207120 15 16912.26 86.00 331.897580.00 - 6810.10 - 8584.20 3.38 0.00 - 1982.92 16 17031.24 86.00331.897588.30 - 6705.40 - 8640.12 0.00 0.00 - 1864.23 17 17061.24 86.00 331.897590.39 - 6679.00 - 8654.22 0.00 0.00 - 1834.30 18 17194.57 90.00 331.89 7595.05 - 6561.49 - 8716.99 3.00 0.00 - 1701.07 19 17249.91 91.66 331.89 7594.24 - 6512.69 - 8743.06 3 00 0.00 - 1645.75 D4 - 23PBl 20 17580.04 91. 66331.897584.68 - 6221.62 - 8898.55 0.00 0.00- 1315.75 D4 - 322 21 17621.35 90.42331.887583.93 - 6185.20- 8918.01 3.00 - 179.74 - 1274.45 22 21519.15 90. 42331.887555.30 - 2747.4310754.80 0.00 0.00 2623.24 CD4- 25wp07 Toe ICD4 -21E D4 -17 I D4-23P134 � D4 -2 ICD4 - 214 ', 0 / 360 D4 ::;D4 0 / 360 �g �� - i D4 -321 30 / 330 �j 071.`- z0� . ] ` r 3 30 _ _ _ - bD4 -16 LEGEND -30 / 330 30 ,,,,4$411 ' ' ' { ,, - ' CD4 -3221 p y ,,.r pig :'`^ - S ' -9- CD4 -o5, CD4-05, C04u5 V0 + - - _ , I D4 -2E d� °g �� �qyA� �.� -X- CD4 -18, CD418. CD4 -16 V2 Nanuq 31 ` ` ' rY/S R�r4 `« .4 -.A � '; r�� I • yr tm $ CD4 -17, C04 -17. CD4 -17013 / s p,s � l ,1y �� 004 -210, 004 -210 CD4 -210 V3 - _� r 2'' ' ''' Y '6 4 ' '11i lill t!'�L 1' s 4 S1 1 " '>s ,. - �i { D 4-31 d - -60 L 30 0 4 k ' * T�'r3 1k i. i 1 I g u = 1f c ,,•04 60 CD4 -213, CD4 213, CD4 213 V4 - / 300 ,-4 60 D4 -24PB c c4k * * }ir�S � y� cD4213,coa- 213. - zl3avoevo / 5 �. • `' "�, 7f E + '� d CD4 214, CD4 -214, CD4 -214 V3 /f a ,..474:314.:01604.4, 04 -31 BP � 4 fi \ I CD4 215, CD4 -215, CD4 -215 V4 1004 -2 , • �� 3 6 _ '- ° � q ' \q4+ 1004 -24P61 304- 318PB ,1 M 07 a 4 ii f~ Q CD423, CD4- 23,004 -23 V0 W: E t i __ ■E ��. 6_ - -0- CD4 23, CD4- 2.1PB1, CD4 -23PB1 VO A � y � r � �� j 4 Q 1 1 1 ICDA -2� 5 � =!.� N •` "'3 Ilift6' r , , - `s 1 . -x- CD4 -23, CD4- 23PB2, CD4 -23PB2 V0 g1/� `v I t 1, .� � II d _ ■ ., i4 �� ri / $ CD4 -24, CD4 -24 CD4-24 Vo INanuq 3 # ,4, , ' i li 1 1 ∎,•VI ` 1i1 ,, l 4 1004- 23PB2I N anuk > , 4 , - sa b 1 S 1 r ' 0 Hitt l d i / l llll if hi ` - D4_24PB` CD4- 24,004- 24PB1.004- 24PB1V0 �i 4 4 M , , . k x J %fi7i t y ''� D4 -23PB1 -90 / 270 z' S j \; 1 1 n plil •I It 9 0 ' cD4 z4, coa z4Pez, coa -z4Pex vo 90 / 2 70 a € - r i \� 3 J� 4 41.1.--- i v 4 � �1���,� , Il 1 },D4 -24P8' 6 coo- 28, - zB,cOa -zsvo � ,r " > ! 3I '\ \ 1� Y -�- CD4 -318, CD4 318, 004318 V8 a �r r p e `' CD4 -2 ,' $ 004.318 CD4 318A, C04318A V6 U4 I{ \� \ , ; ! CD4 -241 CD4 -318, CD4318P61. CD4- 318PB1 V3 1 °" s -'C� l i - CD4 -319, C04-319, 004319 V5 - -'-. \ \�,.'. %� ' - -A CD4 -320, 004.320, CD4 -320 V7 I ' -- ♦ 1 1 - - CD4 -320, CD4320PB1, CD4- 320PB1 V4 120 • -120 1 240 _�-iy -9- i )( 120 004 321, CD4J21, 004321 V16 -120 / 240 ` \ x, I t _ C04 -322. CD4-322, CD4 -322 V8 \�' h ( ri y - Q Nanuq 3, Nanuq 3, Nanuq 3 V1 P � )( Plan 004 25, Plan. C04 -25L1, CD4- 25L1wp12 V I �'<'" V ,y \ < _ O Nenuk 2, N 2, Nenuk 2 Vi ., ; \ � - $- C04-25wp12 -150 /210 6 19' .1 - 150 /210 150 , 200 50 -180 / 180 - 180 / 180 70 w+k CI Travelling Cylinder Azimuth (TFO +AZI) [1 vs Centre to Centre Separation [100 ft/in] Travelling Cylinder Azimuth (TFO+AZI) [ vs Centre to Centre Separation [25 ft/in] osmons 1 • • Conoc P hillips CD4 -25wp 12 Alaska Sperry Drilling ANTI - COLLISION SETTINGS 10:36, August 172010 Interpolation Method: MD, interval: 25.00 Depth Range From: 36.30 To 21519.15 Results Limited By: Centre Distance: 2348.29 GLOBAL FILTER? APPLIED: All wellpaths within 200'+ 100/1000 of reference SURVEY PROGRAM Depth From Depth To Survey /Plan Tool 36.30 1350.00 CD4- 25wp12 (Plan: CD4 -25) GYD -GC -SS 1350.00 21519.15 CD4- 25wp12 (Plan: CD4 -25) MWD +IFR- AK- CAZ -SC CASING DETAILS TVD MD Name Size 2400.00 2972.64 10 -3/4" x 13-1/2" 10 -3/4 7588.30 17031.24 7 -5/8" X 9 -7/8" 7 -5/8 7555.30 21519.15 4-112'x6-3/4" 4-1/2 2 TO cos 0. i N N 7. U l.-1 II I 111, 1 11 1 I 0 60 1 11 2' I I - I 1 I m I1 co a) C - - - -- - - - -- - - - - - -- - - - - - - I - - -- - - - - - - I III - - - II 1 °u I I 11 III 1 U I 0 30 1 a� c a) U I i 1 I 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 I 1 1 1, 1 0 3500 7000 10500 14000 17500 21000 Measured Depth I LEGEND -X- CD4 -05, CD4-05, CD4-05 VO 0 CD4 -23, CD4- 23PB1, CD4 -23PB1 VO -A- CD4-319, CD4-319, CD4 -319 V5 - 0- CD4 -16, CD4-16, CD4 -16 V2 X CD4 -23, CD4- 23PB2, CD4 -23P62 VO {} C04320, CD4320, CD4-320 V7 --8- CD4 -17, CD4 -17, CD4-17 V13 - CD4 -24, CD4 -24, CD4-24 VO -4- CD4-320, CD4320PB1, CD4-320PB1 V4 $ - CD4 -210, CD4-210, CD4 -210 V3 49-- CD4 -24, CD4- 24PB1, CD4 -24PB1 VO -A- CD4 -321, 034321, CD4-321 V16 - CD4-213, 0D4 -213, CD4 -213 V4 -- CD4 -24, CD4 - 24PB2, CD4 -24PB2 VO --T-- 034-322, CD4-322, CD4 -322 V8 CD4-213, CD4-213, CD4- 213wp06 VO -- CD4 -26, CD4 -26, CD4-26 VO --e- Nanuq 3, Nanuq 3, Nanuq 3 V1 CD4-214, CD4-214, CD4 -214 V3 - 034318, CD4-318, CD4 -318 V6 - Plan: CD4-25, Plan: CD4-25L1, CD4-25L1wp12 VO A CD4-215, CD4-215, CD4-215 V4 -9- 034318, CD4-318A, CD4 -318A V5 -A- Nanuk 2, Nanuk 2, Nanuk 2 V1 - 4- - CD4-23, CD4 -23, CD4 -23 VO -e-- CD4 -318, CD4-318PB1, CD4-318PB1 V3 -9- CD4-25wp12 ORIGINAL • • Conac C D4 -2 5w 12 ..w.. . .,..... Alaska Sperry Drilling ANTI - COLLISION SETTINGS 10:36. August 172010 Interpolation Method: MD, interval: 25.00 Depth Range From: 36.30 To 21519.15 Results Limited By: Centre Distance: 2348.29 GLOBAL FILTERfi,'F;PPLIED:,AIl wellpaths within 200'+ 100/1000 of reference SURVEY PROGRAM Depth From Depth To Survey /Plan Tool 36.30 1350.00 CD4- 25wp12 (Plan: CD4 -25) GYD -GC -SS 1350.00 21519.15 CD4- 25wp12 (Plan: CD4 -25) MWD +IFR- AK- CAZ -SC CASING DETAILS TVD MD Name Size 2400.00 2972.64 10 -3/4" x 13 -1/2" 10 -3/4 7588.30 17031.24 7 -5/8" X 9 -7/8" 7 -5/8 7555.30 21519.15 4 -1/2" x 6 -3/4" 4 -1/2 9 4- [n'n 41 ,I, g! N v • g a © 0a 0 0 Z 0 o S} J U 0 I m , m d ., ' iI , c U - 1 -- , , - 1 , 2 - -- _ , 0 ' 1 1.. L 1 III. 0 I 1 1 1 I I 1 1 1 1 f I I 1 I I I 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 ■ 1 1 1 I I I I 0 450 900 1350 1800 2250 2700 :.. Measured Depth LEGEND - CD4 -05, CD4 -05, CD4-05 VO -e- CD4 -23, CD4- 23PB1, CD4-23PB1 VO -- CD4 -319, CD4319, CD4 -319 V5 - e- CD4 -16, CD4 -16, CD4-16 V2 X CD4 -23, CD4-23PB2, CD4 -23PB2 VO -e- CD4 -320, 0 4 -320, C04 -320 V7 - B- CD4 -17, CD4 -17, CD4-17 V13 -X- CD4 -24, CD4 -24, CD4 -24 VO -0- 034 -320, CD4-320PB1, CD4-320PB1 V4 -8- CD4 -210, CD4 -210, CD4 -210 V3 -e- CD4 -24, CD4-24PB1, CD4 -24PB1 VO -29- CD4 -321, CD4321, CD4 -321 V16 - CD4 -213, CD4-213, CD4 -213 V4 -0- 04-24, CD4-24PB2, CD4 -24PB2 VO -4- CD4 -322, CD4-322, CD4-322 V8 - -- CD4 -213, C134213, CD4- 213wp06 VO -- CD4 -26, CD4-26, CD4-26 VO -9- Nanuq 3, Nanuq 3, Nanuq 3 V1 - - 034 -214, CD4-214, CD4 -214 V3 --- CD4-318, CD4-318, CD4 -318 V6 -X- Plan: CD4-25, Plan: CD4 -25L1, CD4-25L1wp12 VO - A-- CD4 -215, CD4-215, CD4-215 V4 -a- CD4-318, CD4-318A, CD4 -318A V5 --A-- Nanuk 2, Nanuk 2, Nanuk 2 V1 Q CD4-23, CD4 -23, CD4 -23 VO -e- C134318, CD4-318PB1, CD4-318PB1 V3 $ CD4- 25wp12 O Easting (2000 ft/in) I I I I I I I I J I I I I I 1 1 1 1 1 1 1 1 1 1 1 I I I 1 1 1 1 1 I I C ' D 4 ',Jl �O 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 l l 1 1 1 1 1 1 1 1 1 1 1 1 1 l 1 I l 1 1 1 I 1 1 1, 1 1 1 I I I I t - I . 1 1_x - _ 1 1 1 10:48, August 17 2111ff - _ AC wells ONLY CD4 -05 CD4 -17 (NOT a 'plder) _ _ CD4 -210 CD4- 213wp0: _ - CD4 -26 - / CD4 -31 e - CD4- 320P61 • CD4 -318A 11111111_ . �j . _ E- I - o O 44, - c - O - _ - CO _ ! L1wp12 CD4 -24 CD4 -2 t - o c _ Z CD4 2Swp12 110e - 1 I ff 14-321 - Ca'- 18PB1 _ k V4-318 _ • CD4 -23 '' CD4 -2 ' . CD4 -320 [� - CD4 -24PB1 - `�"°' CD4 -24PBA ConocoPhillips(Alaska) Inc. -WNS Western North Slope CD4 - 215 - CD4 Nanuq Pad - OA- CD4 -214 Easting (2000 ft/in) pA GLOBAL FILTER APPLIED: All wellpaths within 200'+ 100/1000 of reference SECTION DETAILS 10:54, August 17 2010 C04- 25wp12 Sec MD Inc Azi TVD +N / -S .-E / -W DLeg TFace VSec Target 1 36.30 0.00 0.00 36.30 0.00 0.00 0.00 0.00 0.00 36.30 To 501.00 Ellipsoid Color 2 350.00 0.00 0.00 350.00 0.00 0.00 0.00 0.00 0.00 3 903 44 11.07 211.00 900.00 -45.68 -27.45 2.00 211.00 -27.45 SURVEY INICG 4 2567.81 61.00211.002203.73 - 858.63 - 515.92 3.00 0.00 - 515.92 ROM a,� I'D mo 36 _ 250 1250 1500 3500 4250 9250 11750 19750 21250 5 6272.91 61 00 211.004000.00 - 3636.32 - 2164.92 0.00 0.00 - 2184.92 1360 z1 3 0 3 5 0 0s cIP1-25Z2 (Plan `C0 ui Nwo.ra+uuzsc 250 500 1500 -- - _ -- 1750 4250 - -- 5250 11750 14250 21250 22250 6 6872.91 67.00211.004262.90 -4098.36- 2462.54 1.00 0.00- 2462.54 7 11702.57 67.00 211.006150.00 - 7909.09 -4752.26 0.00 0.00 -4752.26 500 750 1750 " -- 2250 5250 6250 14250 16250 22250 23250 8 13603.13 72.19 272.006872.60 - 8693.11- 6231.07 3.00 96.93 - 4750.24 750 - 1000 2250 _ 2750 6250 7750 16250 - - _ - - - - - -- 18250 23250 - - - - 24000 9 14393.48 74.50 285.007100.00 - 8580.96 - 6977.95 1.60 81 41 -4300.59 10 15241.23 76.00 315.677320.80 - 8171.86 - 7675.55 3.50 91.18 - 3611.87 1000 1250 2750 3500 7750 9250 18250 19750 24000 24500 11 15552.32 76.00 315.677396.08- 7955.94- 7886.47 0.00 0.00- 3322.20 12 15889.58 83.00325.347457.65 - 7700.31 - 8096.74 3.50 54.59 - 2997.79 1316075.22 83.00331.897480.30 - 7543.11 - 8192.64 3.50 90.40- 2813.96 14 16823.56 83.00 331.897571.50 -6887 96 -8542 61 0.00 0.00 - 207120 15 16912.26 86.00 331.897580.00 - 6810.10 - 8584.20 3.38 0.00 - 1982.92 16 17031.24 86.00 331.897568.30 - 6705.40 - 8640.12 0.00 0 00 - 1864.23 17 17061.24 86 DO 331.897590.39- 6679.00- 8654.22 0.00 0.00- 1834.30 18 17194.57 90.00 331.897595.05 - 6561.49 - 8716.99 3.00 0.00 - 1701.07 19 17249.91 91 66 331.89 7594.24 - 6512.69 - 8743.06 3 00 0.00 - 1645.75 20 17580.04 91.66331.897584.68 - 6221.62- 8898.55 0.00 0.00- 1315.75 21 17621.35 90.42331.887583.93 - 6185.20- 8918.01 3.00 - 179.74- 1274.45 22 21519.15 90. 42331.887555.30 - 2747.4310754.80 0.00 0.00 2623.24 CD4- 25wp07 Toe 0 / 360 0 / 360 20i 50 -30 / 330 30 LEGEND -30 / 330 30 -B- CD4 -05, CD4-05, CD4-05 VO )( CD4 -18, CD4 -18, CD4 -16 V2 - 0 CD4 -17, CD4 -17, CD4 -17 V13 )( CD4 -210, CD4 -210, CDa210 V3 -60 / 300 1 O, 60 O CD4 -213, CD4 -213, CD4 -213 V4 -60 / 300 60 $- CD4 -213 CD4 -213, CD4- 213wp06 VO 2 d E ' � 2 p . , kta} , j� cD4 -zta. c0a -x1a. c0a -z14 va - - -- - D4 24P14 • j . �:Ili � CD4 -215 CD4 215, CD4215 V4 � D4 -1 F $ c0a -23, cD4 x3 c0a z3 vD D4 24P8 lid a� wr4 '(�C � y �D.t�IJ�� _ - CD4 -23, C0423PB1, CD4 -23PB1 V0 )( CD4 -23, CD4 23PB2, CD4 -23PB2 VO 1� � �� _ � 1 (1 254 24 , C D4 za, 61 C 5 vo f I� w I 1 t \ y al= ,n�!!i� ■ i4T�M1r $ CD4 -24, CD4- 24PB7. CD4 -24P81 VO 7 I� I '"l r MEI 90 / 270 1011 70 a �.�iil3ixk: , PEI 90 )( CD4 -29, DD424PB2, CD4 -24P82 VO 90 / 270 y 3 $ CD4 -28, CD4 -26, CD4 -26 VO / l l i li C i` -H CD4 -318 CD4 ip '// w � - , 318, CD4316 V8 INanuq p„ , 1 \ 1 j,, CD4 -24 O CD4 -318, CD4-318A, CD4318A V5 i 1 IC 1u %p �� $ CD4 -318, CD4318P81. CD4- 318P51 V3 \\� ._ 1 CD4 -319, CD4319, CD4-319 V5 A CD4 -320, CD4 -320, CD4320 V7 10 i 1 CD4 -320, CD9320PB1, CD4- 320PB1 V4 - - • )( -120 / 240 120 CD4 -321, CD4321, CD4321 V16 -120 / 240 120 -8- CD4 -322. CD4 -322, CD4-322 V8 Q Nanuq 3, Nanuq 3, Nanuq 3 51 )( Plan. CD4 -25, Plan. CD4 -25L1, CD4- 25L1wp12 V1 - e Nanuk 2, Nanuk 2, Nanuk 2 51 -B- CD4 - 258412 -150 /210 150 - 150 /210 150 200 50 ' - 180/180 - 180 /180 CD .w..r... M ravelling Cylinder Azimuth (TFO +AZI) [1 vs Centre to Centre Separation [100 ft/in] Travelling Cylinder Azimuth (TFO +AZI) [ vs Centre to Centre Separation [25 ft/in] �s _ GLOBAL FILTER APPLIED: All wellpaths within 200'+ 100 /1000 of reference S ECTION DETAILS 10:54, August 17 2010 CD4`25wp12 ' Sec MD Inc Azi TVD +N / -S +E / -W DLeg TFace VSec Target 500.00 To 1001.00 Ellipsoid Color 2 350.00 0.00 0.00 350.00 0.00 0.00 0.00 0.00 0.00 3 903.44 11.07 211.00 900 00 -45.68 -27.45 2.00 211.00 -27.45 - - 4 2567.81 61.00 211.002203.73 -858 63 -515 92 3.00 0 00 - 515.92 w'171 .o y' � suave' raacwan 36 - - -- -" 250 1250 1500 3500 4250 9250 11750 19750 21250 5 6272.91 61 00 211.004000.00 -3636 32 - 2184.92 0.00 0.00 - 2184.92 n c sswrzwmn. Cq..25 6 6872.91 67.00 211.004262.90 4098 36 - 2462.54 1.00 0 00 - 2462.54 ,2w ou 2151916 Cr C../ 1.,.. a ..16. 250 500 1500 - -- - 1750 4250 - - - - """ 5250 11750 14250 21250 22250 7 11702.57 67.00 211.006150.00 - 7909.09 4752.26 0.00 0.00 4752.26 500 750 1750 - 2250 5250 6250 14250 16250 22250 23250 8 13603.13 72.19 272 006872.60- 8693.11 - 6231.07 3.00 96.93 -4750.24 750 -- "--- 1000 2250 - 2750 6250 7750 16250 - - - -- 18250 23250 - - - - - - - 24000 9 14393.48 74.50285.007100.00 - 6580.96 - 6977.95 1 60 81.41 -4300.59 1015241.23 76.00 315 677320.80 -8171.86 -7675.55 3.50 91.18 - 3611.87 1000 1250 2750 3500 7750 9250 18250 19750 24000 24500 1 15552.32 76.00 315.677396.08- 7955.94- 7886.47 0.00 0.00- 3322.20 12 15889.58 83.00325.347457.65 - 7700.31 - 8096.74 3.50 54.59 - 2997.79 13 16075.22 83.00 331.897480.30- 7543.11 - 8192.64 3.50 90.40 - 2813.96 14 16823.56 83.00 331.897571.50 - 6887.96- 8542.61 0.00 0.00 - 2071.20 15 16912.26 86.00 331 897580.00 - 6810 10 - 8584.20 3.38 0.00 - 1982.92 16 17031.24 66.00 331.89 7588.30 - 6705.40 - 8640.12 0.00 0.00 - 1864.23 17 17061.24 86.00 331.89 7590.39 - 6679.00 - 8654.22 0 00 0.00 - 1834.30 18 17194.57 90.00 331.897595.05 - 6561.49 - 8716.99 3 00 0.00 - 1701.07 19 17249.91 91.66 331.89 7594.24 - 6512.69 - 8743.06 3.00 0.00 - 1645.75 20 17580.04 91.66 331.897584.68 - 6221.62 - 8898.55 0.00 0.00 - 1315.75 21 17621.35 90.42331.887583.93 - 6185.20- 8918.01 3.00 - 179.74 - 1274.45 22 21519.15 90.42 331.887555.30 - 2747.4310754.80 0.00 0.00 2623.24 CD4- 25wp07 Toe 0 / 360 pD4- 320P8' _ 2,D4 -32C 0 / 360 201 .„ - 50 - 30/330 I 30 LEGEND - 30/330 30 D4 -32� D4 -1F - 004322 -8- CD4 -05, CD4 -05, C54-05 VO -, 1 X CD4 16, CD4 16. CD4 -16 V2 - - _ - - - - - - -e- CD4 17, CD4 -17. CD4 -17 V13 - - -- - 1a MOM � )( 004210 CD4 -210, CD4 -210 V3 CI �: -60 / 300 T��! 60 () CD4 213 004213 CD �2 CD4 -213 V4 ��`A 300 L`•,F -T .0 �� �-4�' 1 , �, i� gg $- 004 213 004213, CD4- 213wp06 V0 - �� �k �.>+� ran k' y , { 004 214 004 214 004 214 V3 I 004 - • `� �f, y P 215, CDa21s 004215 V4 - �; � „� _ sk i j jJ , O CD4 23 CD4 23 CD423 V0 � 1 i'ii 1 -., 1 - . 1 4 \ l 9� O CD4 23 CD423PB1 CD4 23PB7 VO p�, 1 k.1 .� y _ 1 1 7 . a� �f ) � CD423, C0423PB2 CD423PB2 V0 ��� \ � � I iii,i I II \\ b 1Nan 3�_ A / / hq,�, i I� �[ � A 00424 CD424VO /Wry a 1 11!11 D4 -23PB reif c*ilE t Ld , ' ... ., O CD424, CD424Pa1. CD424PB1 V0 r /p11� 1111 90 / 270 a 07 90 90 / 270 �/�IU `��Yh �G 9 � , )( c04 24, CD4 24P62, C04 -24PB2 VO 4Ie�g !f ` � \ %� - D4-23P8 ii ` � -0- CD4 28, CD4 -28, CD4-26 V0 , {T{ � ° �'1 � � "�� 'tl�1 dl __ -a- CD4 318, 004318, CD4 -316 V8 �' ; . ; F 31 • $ CD4- 318, 004 -318A, CD4-318A V5 1' _ ICD4 -231 Q CD4 -318, CD4318PB1, CD4- 318P81 V3 �. I CD4 -319, 004319, 004319 V5 A CD4 -320, 004320, CD4 -320 V7 101 I CD4 -320, CD4320PB1. CD4 - 3201 V4 III -120 / 240 120 X 004321. 004321, 004321 V16 -120 / 240 120 - 9- CD4 -322. CD4 -322, CD4322 V8 Q Nanuq 3, Nanuq 3, Nanuq 3 V1 )( Plan: CD4-25, Plan CD4 -25L1, C134- 25L1wp12 V I - 0 Nanuk 2, Nanuk 2, Nanuk 2 V1 - CD4- 25w512 - - -150 / 210 150 - 150 / 210 150 200 50 - 180 / 180 - 180 / 180 CD 70 40 . 6 " . • Travelling Cylinder Azimuth (TFO +AZI) [1 vs Centre to Centre Separation [100 ft/in] Travelling Cylinder Azimuth (TFO+AZI) [ °] vs Centre to Centre Separation [25 ft/in] V OMMOOMIS GLOBAL FILTER APPLIED: All wellpaths within 200'+ 100/1000 of reference SECTION DETAILS 10:55, August 17 2010 CD4- 25wp12 -- - Sec MD Inc Azi TVD +N / -S +E / -W DLeg TFace VSec Target 1 36.30 0.00 0.00 36 30 0.00 0.00 0.00 0 00 0.00 1000.00 To 2001.00 Elbpsoid Color 2 350.00 0.00 0.00 350.00 0.00 0.00 0.00 0.00 0.00 3 903.44 11.07 211.00 900.00 -45.68 -27.45 2.00 211.00 -27.45 4 2567.81 61.00 211.002203.73 - 858.63 - 515.92 3.00 0.00 - 515.92 TO, 7o vm, saavSURVEY PROGRAM 36 - " "" -- - 250 1250 1500 3500 4250 9250 11750 19750 21250 5 6272.91 61.00 211.004000.00 - 3636.32 -2184 92 0.00 0.00 - 2184.92 oanu c zf..nu Men cousl - - - - - - 5250 11750 14250 21250 22250 6 6872.91 67.00 211.004262.90 - 4098.36 - 2462.54 1.00 0.00 - 2462.54 1350 00 215195 .4..12 lnn CIA 15) .-,vm,ra»cr zx 25 500 1500 1750 4250 7 11702.57 67.00 211.006150.00 - 7909.09 -4752.26 0.00 0.00 -4752.26 500 750 1750 - - 2250 5250 6250 14250 16250 22250 - 23250 8 13603.13 72.19 272.006872.60- 8693.11 -6231 07 3.00 96.93 -4750.24 750 1000 2250 - 2750 8250 7750 16250 - - "" - - -- 18250 23250 24000 9 14393.48 74 50 285.007100.00- 8580.96- 6977.95 1 60 81.41- 4300.59 10 15241.23 76.00 315 677320.80 - 8171.86 - 7675.55 3.50 91.18 - 3611 87 1000 1250 2750 3500 7750 9250 18250 19750 24000 24500 - 1 15552.32 76.00 315.677396.08 - 7955.94- 7886.47 0.00 0.00- 3322.20 12 15889.58 83.00325.347457.65 - 7700.31 - 8096.74 3.50 54.59 - 2997.79 1316075.22 83.00331.897480.30 - 7543.11 - 8192.64 3.50 90.40- 2813.96 14 16823.56 83.00 331.897571.50 - 6887 96- 8542.61 0.00 0.00 - 2071.20 15 16912.26 86 00 331.897580.00 - 6810.10 - 8584.20 3.38 0.00 - 1982.92 16 17031.24 86.00 331.89 7588.30 - 6705.40 - 8640 12 0.00 0.00 - 1864.23 17 17061.24 86.00 331.89 7590.39 - 6679.00 - 8654.22 0.00 0.00 - 1834.30 18 17194.57 90.00 331.89 7595.05 - 6561.49 - 8716.99 3.00 0.00 - 1701.07 19 17249.91 91.66 331.897594.24 - 6512.69 - 8743.06 3.00 0.00 - 1645.75 20 17580.04 91.66 331.897584.68 - 6221.62 - 8898.55 0.00 0.00 - 1315.75 104 - 324 21 17621.35 90. 42331.887583.93 - 6185.20- 8918.01 3.00 - 179.74- 1274.45 22 21519.15 90. 42331.887555.30 - 2747.4310754.80 0.00 0.00 2623.24 CD4- 25wp07 Toe 0D4 -21E vD4 - 17 0 / 360 0 / 360 a Vi$ `- 20° D4 -23PB LEGEND 30 ! 330 50 B04-321 -30 ! 330 30 a, _ �r -� ` 3 D4-23 , &M -8-- CD4 05, CD4 -05, CD4 -05 VO - ,A } `. , ; j � a7i► iiT X 0D416, CD4 -16, 004 -16 V2 `T anuq •a . ma y a � T. -e- C0417,C04- n,C0417V13 ICD4 -26I D4 -24PB2 '1`" if '> ,� �� 004 210, CD4 -210, 0134 -210 V3 - - - r, > f A A lt , , @!!1�'+�ril' , � S. 1,r&, ,,. 60 O CD4 213 CD4 -213. C134-213 V4 -60 / 300 ^ I ' �I 4 ,r 7 . - 304- 31E- 60 ,f a ` bvotivact •11 a t i fi r 1 i l - _� i� ;► 1 e a Rya# $ 004213 004213 CD4- 213wpO8V0 D4 -318F ��1 � ' � © coozla c04214 CD4-214 V3 1 ° r i I \ a 1 054 -215 CA4 -21s CD4 -215 V4 �[I II y D4 -24P61 .D4 -318 P B' 1 h, O CD4 23, CD423, CD4-23 V0 p l I 11 I II , f �L_,, 4' - 'i-e 3 S 1 $ CD4 23, CD4- 23P81, CD4 -23PB1 VO '_ - - %2 ( III / "� . <� 2 �� s, )( CD4 23, CD4 -23P82 CD4 23PB2 VO �,, - , / / - I ll1� 1'� tYx 3Ar's`i� ✓ A C2424,C0424,CD424VO �� �i - \ s 90 / 270 ^ 0 CD4 24, CD4 24P81, CD4 24PB1 VO p ..1.45111 _ a 90 )( CD4 -24, CD9- 24PB2, CD4 -24 VO -90 / 270 `ti, _ 4YD4 -�i4 --�- CD4 -26, DD4 -26, CD426 VO `: <, " �D 4-2� $ CD4 -316, CD4 -316, C134-3113 V6 \\ ' -+"` - 111 , $ C04 -318, C04 -318A, CD4J18A Vs �� - 0 CD4 -316, DD4J1BPB1. C134-318P131 V3 - - • I CD4 -319, 004319, 004319 VS � � "' A CD4 -320, 004320, CD4 -320 V7 C04 -320, CD4 320PB1, C04- 320PB1 V4 101 kt� -- .,> -120 / 240 '__,-5 � 120 CD4 -321, 004-021, 004321 V16 -120 / 240 120 $ C04 -322, CD4 -322, CD9 -022 VB 0 Nanuq 3, Nanuq 3, Nanuq 3 V1 X Plan. C04 -25, Plan C134-25L7, CD4- 25L1wp12 V I O Nenuk 2, Nanuk 2, CD4- 2 VI .,'. �; $ C04- 25w012 = r n -150 /210 'la, - 150 /210 150 200 50 -180 / 180 -180 / 180 CD 2 V G " ) Travelling Cylinder Azimuth (TFO +AZI) [1 vs Centre to Centre Separation [100 ft/in] Travelling Cylinder Azimuth (TFO +AZI) [ °] vs Centre to Centre Separation [25 ft/in] rew CD4-25wp12 GLOBAL FILTER APPLIED: All wellpaths within 200'+ 100/1000 of reference SECTION DETAILS 10:55, August 17 2010 C Sec MD Inc Azi TVD +N / -S +E / -W DLeg TFace VSec Target A 1 36.30 0.00 0.00 36.30 0.00 0.00 0.00 0.00 0.00 2000.00 To 3001.00 Ellipsoid Color 2 350.00 0.00 0.00 350.00 0.00 0.00 0.00 0.00 0.00 3 903.44 11.07 211.00 900.00 -45.68 -27.45 2.00 211.00 -27.45 WIWI vaaavun 4 2567.81 61.00211.002203.73 - 858.63 - 515.92 3.00 0.00 - 515.92 a. � TAO m Cr.= 36 " "" 250 1250 1500 3500 4250 9250 11750 19750 21250 5 6272.91 61.00 211.004000.00 - 3636.32 - 2184.92 0.00 0.00 - 2184.92 oo cr.= in..cw-ss1 Itsess -- - -- 6 6872.91 67.00211.004262.90 -4098.36- 2462.54 1.00 0.00 - 2462.54 1350 uo 21610 IS C04-004-.25,12 s12 in- oo c-25o r�wo•ma�cvzsc 250 500 1500 1750 4250 - 5250 11750 14250 21250 22250 711702.57 67.00211.006150.00 - 7909.09 -4752.26 0.00 0.00 -4752.26 500 750 1750 - 2250 5250 6250 14250 16250 22250 23250 8 13603.13 72.19 272.006872.60- 8693.11- 6231.07 3.00 96.93 -4750.24 750 1000 2250 -- 2750 6250 7750 16250 - .._ - - -- 18250 23250 - __ -- 24000 9 14393.48 74.50 285.007100.00- 8580.96- 6977.95 1.60 81.41 -4300.59 10 15241.23 76.00 315.677320 80 - 8171.66 - 7675.55 3 50 91.18 - 3611.87 1000 1250 2750 3500 7750 -- 9250 18250 19750 24000 24500 11 15552.32 76.00 315.677396.08- 7955.94- 7886.47 0.00 0.00- 3322.20 12 15889.58 83.00325.347457.65 - 7700.31 - 8096.74 3.50 54.59 - 2997.79 1316075.22 83.00331.897480.30 - 7543.11 - 8192.64 3.50 90.40- 2813.96 14 16823.56 83.00 331 897571.50 - 6887.96 - 8542.61 0.00 0.00 - 2071.20 15 16912.26 86.00 331.897580.00 - 6810.10 - 8584.20 3.38 0.00 - 1982.92 16 17031.24 86.00 331.897588.30 - 6705.40 - 8640.12 0.00 0.00 - 1864.23 17 17061.24 86.00 331.897590.39 - 6679.00 - 8654.22 0.00 0.00 - 1834.30 18 17194.57 90.00 331.897595 05 - 6561.49 - 8716.99 3.00 0.00 - 1701.07 19 17249.91 91.66 331.89 7594.24 - 6512.69 - 8743.06 3.00 0.00 - 1645.75 PD4 - 23P81 20 17580.04 91. 66331.897584.68 - 6221.62 - 8898.55 0.00 0.00- 1315.75 is 21 17621.35 90.42331.887583.93 - 6185.20- 8918.01 3.00 - 179.74 - 1274.45 ,,1111 2221519.15 90. 42331.887555.30 - 2747.4310754.80 0.00 0.00 2623.24 C04- 25wp07 Toe D4-23PBq ICD4 -2E 0 / 360 ' , , 0 / 360 2 -1 -- -__ 50 -30 / 330 .,, -, - "P _`; - - . r . 30 LEGEND -30 / 330 30 q,, 1 :3D4-2€_ - IN ` 1i tt : `- -i l CD4 -05, CD4 -05, C0405 V0 , z I N," . _ A X C04 -16, C04 -16, CD4 -16 V2 - - - , {`- _ _ : I -e- CD4 -17, CD4 -17, 604-17 V13 .! - )( C134-210, C134-210, 604 -210 V3 60 / 300 - 60 - - 8- CD4 -213, CD4 -213, C134-213 V4 -60 / 300 60 101 - $- CD4 -213, CD4 -213, C04- 213wp06 VO Q CD4 -214, CD4 -214, CD4 -214 V3 3 C04 -215, C04 -215, 684 -215 V4 C04 -23, CD4 -23, CD4-23 VO � \ -� C54 23, 604-23071, 604 -23P51 VO ' III: k )( CD4 23 C134-23P62 COO -235532 VO iD4 24PB3 A C8424, 004 24 604 24V0 31 �: tl ^ I III o CD424, C04240B7 C8424PB1 V0 - 90/270 ��` rl ; i4 -2408' )< CD4 - 24,604 - 24082,604- 24P82V0 9O/ 90 \� CD4 -25, C04 -28, 004-26 VO � D4 -24 -B- CD4 -318, CD4 -318 C04318 V6 - Q CD4 -318, CD4.518A, C04318A VS -- - k Q 604 -318, 604318071, 604- 318081 V3 - l.,:,., 3 654 -319. C04319, C04-318 05 p.. A 604 -320. C04320, C04 -320 W 604 -320, 604320P61, C134-320781 V4 -120 / 240 101 120 )( C04 -321, 604321, CD4321 V16 -120 / 240 120 III -8- 604 -322, 604322, CD4 -322 V8 Nanuq 3. Nanuq 3, Nanuq 3 V1 X Plan 604 -25, Plan: 604 -25L1, C04- 25L1wp12 V 1 -e- Nanuk 2, Nanuk 2, Nanuk 2 V1 C04- 25wp12 -150 / 210 150 -150 / 2 - 150 200 50 -180 / 180 -180 / 180 I (11p..•k 1 Travelling Cylinder Azimuth (TFO +AZI) [1 vs Centre to Centre Separation [100 ft/in] Travelling Cylinder Azimuth (TFO +AZI) [ vs Centre to Centre Separation [25 ft/in] >a. to GLOBAL FILTER APPLIED: All wellpaths within 200'+ 100/1000 of reference SECTION DETAILS 10:56, August 17 2010 CD4-25wp12 Sr Sec MD Inc Azi TVD +N / -S 4-E / -W DLeg TFace VSec Target 1 36.30 0.00 0.00 36 30 0 00 0 00 0.00 0.00 0 00 3000.00 To 4501.00 Ellipsoid Color 2 350.00 0.00 0.00 350.00 0.00 0.00 0.00 0.00 0.00 3 903.44 11.07 211.00 900.00 -45.68 -27.45 2.00 211.00 -27.45 4 2567.81 61.00 211.002203.73 - 858.63 - 515.92 3.00 0.00 - 515.92 wwn ,o gar: is - - 250 1250 1500 3500 4250 9250 11750 19750 21250 5 6272.91 61.00 211.004000.00 - 3636.32 - 2184.92 0.00 0.00 - 2184.92 aqn 0 zsw12 in. cw-25) 6 6872.91 67.00 211.004262.90 -4098 36 - 2462.54 1.00 0.00 - 2462.54 135000 21519°5 cw 04 - 2.02 004 -25) 2.wm..a x.rxac 250 500 1500 _ - - -- _ -- 1750 4250 ___ 5250 11750 14250 21250 22250 711702.57 67.00211.006150.00 - 7909.09 -4752.26 0.00 0.00 - 4752.26 500 750 1750 2250 5250 6250 14250 16250 22250 23250 8 13603.13 72.19 272.006872.60- 8693.11 - 6231.07 3.00 96.93- 4750.24 750 - 1000 2250 2750 6250 7750 16250 -- _ - 18250 23250 - - - 24000 9 14393.48 74 50 285.007100 00 - 8580.96 - 6977.95 1.60 81.41 -4300.59 10 15241.23 76 00 315.677320.80 - 8171.86 - 7675.55 3 50 91.18 - 3611.87 1000 1250 2750 3500 7750 9250 18250 19750 24000 24500 11 15552.32 76.00 315.677396.08- 7955.94- 7886.47 0.00 0.00- 3322.20 12 15889.58 83.00 325.347457.65 - 7700.31 - 8096.74 3.50 54.59 - 2997.79 1316075.22 83.00331.897480.30 - 7543.11 - 8192.64 3.50 90.40- 2813.96 14 16823.56 83.00 331 897571.50 - 6887.96- 8542.61 0.00 0.00 - 2071.20 15 16912.26 86.00 331.897580.00 - 6810.10 - 8584.20 3.38 0.00 - 1982.92 16 17031.24 86.00 331.897588.30 - 6705.40 - 8640.12 0.00 0.00 - 1864.23 17 17061.24 86.00 331.897590.39 - 6679.00 - 8654.22 0.00 0 00 - 1834.30 18 17194.57 90.00 331.89 7595.05 - 6561.49 - 8716.99 3.00 0.00 - 1701.07 19 17249.91 91 66 331.89 7594.24 - 6512.69 - 8743.06 3 00 0.00 - 1645.75 20 17580.04 91.66 331.89 7584.68 - 6221.62 - 8898.55 0.00 0.00 - 1315.75 21 17621.35 90.42 331.88 7583.93 - 6185.20- 8918.01 3.00 - 179.74 - 1274.45 22 21519.15 90.42 331.887555.30 - 2747.4310754.80 0.00 0.00 2623.24 CD4- 25wp07 Toe 0 / 360 0 / 360 201 50 -30 / 330 30 LEGEND -30 / 330 30 aik $ - CD4 -05, CD4-05, CD4 -05 V0 )( CD4 -16, CD4 -18, C04-16 V2 CD4 -17, CD4 -17, CD4 -17 013 X CD4 -210, 004 -210, C134-210 03 -60 / 300 60 0 CD4 - 213, 004 -213,0134 -213 V4 - / 300 60 1 1 1 - � CD4 -213, CD4 -213, CD4- 213wp06 50 A C54 -214, 004 -214, C04 -214 02 I CD4 -215, CD4 -215, CD4 -215 04 0 CD4 -23, C04 -23, 004-23 VO CD4 -23, CD4- 23P81, C04 -23PB1 00 CD4 -23, CD4 - 23PB2, 004 -23PB2 VO f � � % i {� k A 00 4 004 -2424, , c04 - CD4- 24, 24P51 CD424 0 'I( /h1 �/h �,l CD4 -24PB4 _ , 004 -24P91 VO 90 / 2 70 I I�� ! IIIIlY 9 1 � ,1 D4 -24PB i $ X C D4 - 24 , CD4 - 24PB2 004 -24PB2 V0 90 / 270 90 1 0 04- 26 111 ,� $- CD4 -318, 004318, 0134-310 0,5 `,, D4 -24 e- CD4 -318, CD4 -316A, C04-318A V5 ` 0 CD4 -318, CD4318PB1, CD4- 318PB1 V3 I C04 -319, CD4319, C04319 55 5 C04 -320, 054 -320, 004 -320 V7 1 101 -3 CD4 -320, CD4320PB1, 004- 320P81 V4 - - -120 / 240 120 004-321, 004321, 004321 V16 -120 / 240 - IF - 120 III 004 -322, 004322, C04 -322 V8 -e- Nanuq 3, Nanuq 3, Nanuq 3 V1 X Plan CD4 -25, Plan: CD425L1, C04- 25L1wp12 VI 0 Nanuk 2, Nanuk 2, Nanuk 2 V1 -8- CD4- 25wp12 - - - -- _ -150 / 210 150 -150 / 210 150 200 50 -180 / 180 - 180 / 180 CD G Travelling Cylinder Azimuth (TFO +AZI) [1 vs Centre to Centre Separation [100 ft/in] Travelling Cylinder Azimuth (TFO+AZI) [ °] vs Centre to Centre Separation [25 ft/in] GLOBAL FILTER APPLIED: All wellpaths within 200'+ 100/1000 of reference SECTION DETAILS 10:56, August 17 2010 CD4- 25wp12 Sec MD Inc Azi TVD +N / -S +E / -W DLeg TFace VSec Target 1 36.30 0 00 0.00 36.30 0.00 0.00 0.00 0.00 0.00 4500.00 To 5501.00 Ellipsoid Color 2 350.00 0.00 0.00 350.00 0.00 0.00 0.00 0.00 0.00 3 903.44 11.07 211.00 900.00 -45.68 -27.45 2.00 211.00 -27.45 4 2567.81 61.00 211.002203 73 -858 63 - 515.92 3 DO 0.00 - 515.92 7.rw.am cem5.o a�9ria, sum.r.accaan 36 - -- -- 250 1250 1500 3500 4250 9250 11750 19750 21250 5 6272.91 61 00211.004000.00 - 3636.32 - 2184.92 0.00 000- 2184.92 c 2.. 20.w. 07.611 6 6872.91 67.00 211.004262.90 -4098.36 - 2462.54 1.00 0.00 - 2462.54 Imo 21519 055 07 man UN.) .nvo..aaaccasc 250 500 1500 - - 1750 4250 _ . -- 5250 11750 14250 21250 22250 711702.57 67.00211.006150.00 - 7909.09 -4752.26 0.00 0.00 -4752.26 500 750 1750 - -- 2250 5250 8250 14250 16250 22250 23250 8 13603 13 72.19 272.006872.60- 8693.11- 6231.07 3.00 96.93-4750.24 750 - 1000 2250 2750 6250 7750 16250 - 18250 23250 .. - _ 24000 9 14393.48 74.50 285.007100.00- 8580.96- 6977.95 1.60 81.41 -4300.59 10 15241.23 76.00 315 677320.80 - 8171.86 - 7675.55 3.50 91.18 - 3611.87 1000 1250 2750 3500 7750 -- 9250 18250 19750 24000 24500 1 1 15552.32 76.00 315.677396.08 - 7955.94 -7886 47 0.00 0.00 - 3322.20 12 15889.58 83 00 325.347457.65- 7700.31 - 8096.74 3.50 54.59 - 2997.79 13 16075.22 83.00 331.897480.30- 7543.11 - 8192.64 3.50 90.40- 2813.96 14 16823.56 83 DO 331.89 7571.50 - 6887.96 - 8542.61 0.00 0.00 - 2071.20 15 16912.26 86.00 331.897580.00 - 6810.10 - 8584.20 3.38 0.00- 1982.92 16 17031.24 86.00 331.897588.30 - 6705.40 - 8640.12 0.00 0.00 - 1864.23 17 17061.24 86.00 331.897590.39 - 6679.00 - 8654.22 0.00 0.00 - 1834.30 18 17194.57 90.00 331.897595.05 - 6561.49 - 8716.99 3.00 0.00 - 1701.07 19 17249.91 91.66 331 897594.24 -6512 69 - 8743.06 3.00 0.00 - 1645.75 20 17580.04 91.66 331.897584.68 - 6221.62 - 8898.55 0.00 0.00 - 1315.75 III 21 17621.35 90.42 331.887583 93 - 6185.20- 8918.01 3.00 - 179.74- 1274.45 2221519.15 90.42331.887555.30 - 2747.4310754.80 0.00 0.00 2623.24 CD4- 25wp07 Toe 0 / 360 0 / 360 200 50 -30 / 330 30 LEGEND -30 / 330 30 -� CD4 -05, CD4 -05, CD4 -05 V0 )( CD4 -18, CD4 -16. C0416 V2 - fa- CD4 -17, CD4 -17. CD4 -17 V13 )( CD4 -210, CD4 -210, CD4 -210 V3 -60 / 300 60 -e- CD4 -213, CD4 -213, CD4 -213 V4 -60 / 300 60 Aigh $- CD4 -213, CD4 -213, CD4- 213wp08 V0 O CD4 -214, 004 -214, CD4 -214 V3 7 CD4 -215, CD4 -215, CD4 -215 V4 - e - CD4 -23, CD4 -23. C04-23 VO o CD4 -23, CD4- 23PB1, 004 -23001 VO )( C04 -23, C04- 23002. 00.4 -230132 VO Ai, , .., A CD4 -24, CD4 -24, CD4-24 50 -90 / 270 90 ) ( con -24, CD4 24Pe2, CD4-24PB2 50 -90 / 270 90 $ CD4 -26, 034.26, 004-26 vo .. $ CD4 -310, CD4318, C04 -315 V6 _ -9- CD4 -318, CD4 -318A, C134-318A V5 $ CD4 -318, C134-318P61, CD4-318PB1 V3 \ 7 CD4 -319, CD4319, C04319 V5 A C04 -320. CD4 -320, CD4320 V7 - '- \ 101 7 C04 -320, 0043200BI, CD4- 320PB1 V4 -120 / 240 \ \ • 120 X CD4 -321, 004321, 004321 V16 -120 / lillior...... 120 IIII - -., ., $ CD4 -322, CD4322, CD4322 08 . 0 Nanuq 3, Nanuq 3, Nanuq 3 VI X Ran C04 -25, Plan C04 -25L1, C04- 25L1wp12 V I \ --e- Nanuk 2, Nanuk 2, Nanuk 2 71 , - *, '.\\ $- CD4- 25wp12 -150 / 210 \ . 150 -150 / 2 150 ' ` 200 50 -180 / 180 - 180 / 180 CD C911.1011. ■ Travelling Cylinder Azimuth (TFO +AZI) [9 vs Centre to Centre Separation [100 ft/in] Travelling Cylinder Azimuth (TFO +AZI) [ vs Centre to Centre Separation [25 ft /in] ate. • e GLOBAL FILTER APPLIED: All wellpaths within 200'+ 100/1000 of reference SECTION DETAIL 10:57, August 17 2010 - CD4- 25wp12 Sec MD Inc Azi TVD +N / -S +E / -W DLeg TFace VSec Target 1 36.30 0.00 0.00 36 30 0.00 0.00 0 00 0.00 0.00 - 5500.00 To 6501.00 Ellipsoid Color 2 350.00 0.00 0.00 350.00 0.00 0.00 0.00 0.00 0.00 3 903.44 11.07 211.00 900.00 -45.68 -27.45 2.00 211.00 -27.45 SURVEY ...GPM 4 2567.81 61.00 211.002203.73 - 858.63 - 515.92 3 00 0.00 - 515.92 36 250 1250 1500 3500 4250 9250 11750 19750 21250 5 6272.91 61.00 211.004000.00 - 3636.32 - 2184.92 0.00 0.00 - 2184.92 38 110' 0 GIN-..P. „ W0 GI ..x.ac.c zsc 250 500 1500 .) M - -- - -- "- 1750 4250 -- 5250 11750 14250 21250 22250 6 6872.91 67.00211.004262.90 - 4098.36 - 2462.54 1.00 0.00 - 2462.54 x. 00 zs0 7 11702.57 67.00 211.006150.00 - 7909.09 -4752.26 0.00 0.00 -4752.26 500 750 1750 2250 5250 6250 14250 16250 22250 23250 8 13603.13 72.19 272.006872.60- 8693.11 - 6231.07 3.00 96.93 -4750.24 750 1000 2250 '-- 2750 6250 7750 16250 _ - - - -- _ -- 18250 23250 - - 24000 9 14393.48 74.50 285.007100.00- 8580.96 - 6977.95 1.60 81 41 -4300.59 10 15241.23 76.00 315.677320.80 - 8171.86 - 7675.55 3.50 91 18 - 3611.87 1000 1250 2750 3500 7750 9250 18250 19750 24000 24500 11 15552.32 76.00 315.677396.08 - 7955.94 - 7886.47 0.00 0.00 - 3322.20 12 15889.58 83.00325.347457.65 - 7700.31 - 8096.74 3.50 54.59 - 2997.79 13 16075.22 83.00 331.897480.30- 7543.11 - 8192.64 3.50 90.40 - 2813.96 14 16823.56 83 00 331.897571.50 - 6887.96- 8542.61 0.00 0.00 - 207120 15 16912.26 86.00 331.897580.00 - 6810.10 - 8584.20 3.38 0.00 - 1982.92 16 17031.24 86.00 331.897588.30 - 6705.40 - 8640.12 0.00 0.00 - 1864.23 17 17061.24 86.00 331.897590.39 - 6679.00 - 8654.22 0.00 0.00 - 1834.30 18 17194.57 90 00 331.89 7595.05 - 6561.49 - 8716.99 3.00 0.00 - 1701.07 19 17249.91 91 66 331.897594.24 - 6512.69 - 8743.06 3 DO 0.00 - 1645.75 20 17580.04 91. 66331.897584.68 - 6221.62 - 8898.55 0.00 0.00- 1315.75 21 17621.35 90.42 331.887583.93 - 6185.20 - 8918.01 3.00 - 179.74 - 1274.45 22 21519.15 90. 42331.887555.30 - 2747.4310754.80 0.00 0.00 2623.24 CD4- 25wp07 Toe 0 / 360 0 / 360 201 50 - 30/330 30 LEGEND - 30/330 - 30 'il T - <4' / `,4)1 'Ali -9- CD4 -05, CD4 -05, CD4 -05 00 - - - CD4 -16, 004 -16, CD4-16 V2 , Y• K / /' 0 CD4 -17, CD4 -17, CD4 -17 V13 'y ; , �. - -` - - . ? .� )( CD4 -210, 054 -210, CD4 -210 V3 -60 / 300 . \ '.''' 60 -e- CD4 -213, CD4 -213, 054 -213 V4 -60 / 300 - - 60 k k - 8- CD4 -213, CD4 -213, CD4- 213wp06 VO A .x7 f .. A CD4 -214, CD4 -214, CD4 -214 V3 _ A T,i s -- ' -,/ xF Y I CD4 -215, CD4 -215. CD4 -215 V4 - _ ---'s \ )<,' . ' • . 1 --0 CD4 -23, 05 CD4 -23 VO Nlanuk , , ', ,, - / „r ; -0- CD4 - 23,004 - 236131,004 -23PB1 VO °� \ .. {� . )( CD4 -23, 00423682, CD4 -23682 V0 r 7 Y A 054 -24, 004-24, CD4 -241/0 ■ ■ `�,'\ ' �,,. -4- CD4 -24, 00424681, CD4 -246131 VO 0 -90 / 270" 90 X -90 / 270 90 009 -24, CD424P82, CD4 -24682 VO . , \I ,� 9 1 `. h, ,x,/ / / '/ �- CD4 -26, C04-26, CD426 V0 x ! / I -8- 054 -318, 004316, CD4 -316 V5 - ; - gy p' o 004 -318, 0043185, C04318A VS _ _ -- 1 , % P 0 054-318, 004318681. CD4 - 318601 V3 + r K � {f I CD4 -319, 004319, C04319 V5 - - - x '� : 4'?1 © CD4 -320, CD4 -320, 004320 07 3 C04 -321, 00432 CP1- 320681 V4 - 120 / 2 _- ./ / ;, 101 120 )< CD4 -321, 004321, 1. CD 004321 V16 -120 / 240 120 al -8- 054322, 054322, C04-322 V8 - - - ' 0 Nanuq 3, Nanuq 3, Nanuq 3 V1 )( Ran CD4 -25, Plan' 034-260, CD4- 25L1wp12V - 0 Nanuk 2, Nanuk 2, Nanuk 2 V1 ' 1 $- CD4- 25wp12 _ - 150 /210 ,- ; it 150 - 150 /210 150 ' ' ' ■ 200 50 -180 / 180 - 180 / 180 NIMPNINNIV 6. 1 Travelling Cylinder Azimuth (TFO +AZI) [1 vs Centre to Centre Separation [100 ft/in] Travelling Cylinder Azimuth (TFO+AZ1) [O] vs Centre to Centre Separation [25 ft /in] { GLOBAL FILTER APPLIED: All wellpaths within 200'+ 100/1000 of reference SECTION DETAILS 10:58, August 17 2010 CD4.25wp12 Sec MD Inc Azi TVD +N / -S +E / -W DLeg TFace VSec Target 1 36.30 0.00 0.00 36.30 0.00 0.00 0 00 0.00 0.00 6500.00 To 19001.00 ElllpsokI Color 2 350.00 0.00 0.00 350.00 0.00 0.00 0.00 0.00 0.00 3 903.44 11.07 211.00 900.00 -45.68 -27.45 2.00 211.00 -27.45 4 2567.81 61.00 211.002203.73 -858 63 - 515.92 3.00 0.00 - 515.92 amw '1'150 m %„ SURVEY caon6un 36 - - _ - 250 1250 1500 3500 4250 9250 11750 19750 21250 5 6272.91 61.00 211.004000.00 - 3636.32 - 2184.92 0.00 0.00 - 2184.92 cw-zsw3051 000-001 - 6 6672.91 67.00 211.004262.90 -4098 36 -2462 54 1.00 0.00 - 2462.54 1sso 00 21519 15 coa- zaP +z( n� C M . ) zsc 250 500 1500 1750 4250 - - 5250 11750 14250 21250 22250 7 11702.57 67.00 211.006150.00 - 7909.09 - 4752.26 0.00 0.00 -4752.26 500 750 1750 -- 2250 5250 6250 14250 16250 22250 23250 8 13603.13 72.19 272.006872 60- 8693.11 - 6231.07 3.00 96.93 -4750.24 ■ 750 ' --- 1000 2250 2750 6250 7750 16250 18250 23250 24000 9 14393.48 74.50 285.007100.00 - 8580.96 - 6977.95 1.60 81.41 -4300.59 10 15241.23 76 00 315.677320 80 - 8171.86 - 7675.55 3 50 91.18 - 3611.87 1000 1250 2750 3500 7750 9250 18250 19750 24000 24500 11 15552.32 76.00 315.677396.08- 7955.94- 7886.47 0.00 0.00- 3322.20 12 15889.58 83.00325.347457.65 - 7700.31 - 8096.74 3.50 54.59 - 2997.79 1316075.22 83.00331.897480.30 - 7543.11 - 8192.64 3.50 90.40 - 2813.98 14 16823.56 83.00 331.897571.50 - 6887.96- 8542.61 0.00 0.00 - 2071.20 15 16912.26 86.00 331.897580.00 - 6810.10 - 8584.20 3.38 0.00 - 1982.92 16 17031.24 86.00 331.897588.30 - 6705.40 - 8640.12 0.00 0.00 - 1864.23 17 17061.24 86.00 331.897590.39 - 6679.00 - 8654.22 0.00 0.00 - 1834.30 18 17194.57 90.00 331.897595.05 - 6561.49 - 8716.99 3.00 0.00 - 1701.07 19 17249.91 91 66 331.897594 24 - 6512.69 - 8743.06 3.00 0.00 - 1645.75 20 17580.04 91.66 331.89 7584.68 - 6221.62 - 8898.55 0 00 0.00 - 1315.75 21 17621.35 90.42 331.88 7583.93 - 6185.20 - 8918.01 3.00 - 179.74 - 1274.45 22 21519.15 90. 42331.887555.30 - 2747.4310754.80 0.00 0.00 2623.24 CD4- 25wp07 Toe 0 / 360 0 / 360 20i 50 -30 / 330 30 LEGEND -30 / 330 30 -a- C04 -05, CD4 -05, CD4-05 VO X CD4 -16, CD4 -16. C04-16 V2 -4- CD4 -17, CD4 -17, CD4-17 V13 )( CD4 -210, CD4 -210, CD4 -210 V3 - -- - _ _ -60 / 300 60 -8 ' - CD4 -213, CD4 -213, CD4 -213 V4 -60 / 3 60 Agh - 8- CD4 -213, CD4 -213, CD4- 213wp06 VO Aigh A CD4 -214, CD4 -214. C04 -214 V3 I CD4 -215, CD4 -215, CD4 -215 V4 O CD4 -23, CD4 -23. CD4 -2 V0 -� C04 -23, 004- 20781. CD4 -23P81 VO )( CD4 -23, C04.23P82, CD4 -23PB2 V A CD4 -24, 204 -24. CD4 -24 V -90 127O -0- 004-24, 004-24781. CD4 -29781 VO 90 X C04 -24, CD4 - 24782. CD4 -24782 v0 -90 / 270 90 - C04 -26, CD4 -26, CD4 -26 VO - CD4 -318, CD4-318, CD4 -318 56 O CD4 -318, CD4 -318A, C04318A 55 0 CD4 -315, C130-3181 004 - 318761 V3 3 0D4 -319. 054319. 004319 55 A 254 -320, 004 -320, 004320 57 1 1 3 004 -320, 004320781, C04- 320PB1 54 - • -120 / 240 120 004321, 004321, 004321516 -120 / 240 - 120 -8- C04 -322, CD4 -322. C04 -322 V8 - - Q Nanuq 3, Nanuq 3, Nanuq 3 51 X Plan: CD4 -25, Plan CD4 -25L1, 004- 25L1wp12 51 - O Nara* 2, Nanuk 2, Nanuk 2 51 - CD4- 25wp12 -150 / 210 150 -150 / 210 150 200 50 -180 / 180 - 180 / 180 CD A n Travelling Cylinder Azimuth (TFO +AZI) [1 vs Centre to Centre Separation [100 ft/in] Travelling Cylinder Azimuth (TFO+AZI) [ vs Centre to Centre Separation [25 ft/in] • c GLOBAL FILTER APPLIED: All wellpaths within 200'+ 100/1000 of reference SECTION DETAILS 10:59, August 17 2010 CD4- 25Wp12 - - Sec MD Inc Azl TVD +N / -S +E/ -W DLeg TFace VSec Target 1 36.30 0.00 0.00 36.30 0.00 0.00 0 00 0.00 0.00 19000.00 To 20001.00 Ellipsoid Color 2 350.00 0.00 0.00 350.00 0.00 0.00 0.00 0.00 0.00 3 903.44 11.07 211.00 900.00 -45.68 -27.45 2.00 211.00 -27.45 4 2567.81 61.00 211.002203.73 - 858.63 - 515.92 3.00 0.00 - 515.92 SM. IVNI o ,�, � „ �„, 10 s ,,, w , �� 36 - - -- - - 250 1250 1500 3500 4250 9250 11750 19750 21250 5 6272.91 61.00 211.004000.00 - 3636.32 - 2184.92 0.00 0.00 - 2184.92 'MOO Isli is c w , � -z � i z ( a • . s w s wxo.rvrrusc 2 500 1500 " - -- 1750 4250 - 5250 11750 14250 21250 22250 6 6872.91 67.00211.004262.90 - 4098.36- 2462.54 1.00 0.00- 2462.54 21519 7 11702.57 67.00 211.006150.00 - 7909.09 -4752.26 0.00 0.00 -4752.26 500 750 1750 - -- 2250 5250 6250 14250 16250 22250 23250 8 13603.13 72.19 272.006872.60 - 8693.11 - 6231.07 3.00 96.93 -4750.24 750 --- 1000 2250 " " "' 2750 6250 7750 16250 - - - - - - -- - 18250 23250 - - - - _ 24000 9 14393.48 74.50 285.007100.00 - 8580.96 - 6977.95 1.60 81.41 - 4300.59 10 15241.23 76.00 315 677320.80 -8171 86 -7675 55 3.50 91.18 - 3611.87 1000 1250 2750 3500 7750 9250 18250 19750 24000 24500 11 15552.32 76.00 315.677396.08 - 7955.94 - 7886.47 0.00 0.00- 3322.20 12 15889.58 83.00325.34745765 - 7700.31 - 8096.74 3.50 54.59 - 2997.79 13 16075.22 83.00 331.897480.30- 7543.11 - 8192.64 3.50 90.40- 2813.96 14 16823.56 83 00 331.89 7571.50 - 6887.96- 8542.61 0.00 0.00 - 2071.20 15 16912.26 86.00 331.89 7580.00 - 6810.10 - 8584.20 3.38 0.00 - 1982.92 16 17031.24 66.00 331.89 7588.30 - 6705.40 - 8640.12 0.00 0.00 - 1864.23 17 17061.24 86.00 331.89 7590.39 - 6679.00 - 8654.22 0.00 0.00 - 1834.30 18 17194.57 90.00331.897595.05 - 6561.49 - 8716.99 3.00 0.00 - 1701.07 19 17249.91 91.66 331.897594.24 - 6512.69 - 8743.06 3.00 0.00 - 1645.75 20 17580.04 91.66 331.897584.68 - 6221.62 - 8898.55 0.00 0.00 - 1315.75 21 17621.35 90.42331.887583.93 - 6185.20- 8918.01 3.00 - 179.74 - 1274.45 22 21519.15 90.42 331.887555.30 - 2747.4310754.80 0.00 0.00 2623.24 CD4- 25wp07 Toe 0 / 360 0 / 360 20. 50 -30 / 330 /., j I 30 LEGEND -30 / 330 - 30 ■ �/� % // / ' 1 I I / '/ $ I CD4 -05, CD4 -05, CD4-05 VO j / X CD4 -16, CD4 -16, CD4-16 V2 CD4 -17, CD4 -17, CD4 -17 V13 /� /j J 1 )< CD4 -210, CD4 -210, 504 -210 V3 // ' � -60 / 300 60 0 CD4 -213, CD4 -213, C04 -213 V4 i- -- �'1 / /' 101 � A C04 -213, 064 -213, C04- 213wp06 VO -60 / 3OO 60 / .. A CD4 -214, 5134 -214, 504 -214 V3 I CD4 -215, C134 -215, C04 -215 V4 j Q CD4 -23, CD4 -23. CD4 -23 VO O CD4 -23, CD4- 23PB1, CD4 -23P81 40 - )( CD4 -23, CD4- 23PB2, CD4 -23PB2 50 A CD4 -24, 004-24, CD4 -24 VO 90 / 270 90 ---0- C04 -24, C04- 24PB1, CD4 -24P51 50 X C04 -24, CD4- 24P02, CD4 -24P02 VO -90 1 270 90 CD4 -26, CD428, 554-28 VO - B- CD4 -318, 004318, C04 -318 46 O CD4 -318, C04-318A, CD4-318A V5 ' -0- CD4 -318, CD4318PB1, CD4- 318PB1 V3 - I 004 -319. 004319. C04-319 55 A 00D4 -320, CD4320, 004320 07 240 10 s -/- C134-320, CD4320P81, CD4-320P61 V4 • -120 / 120 )< C04 -321, 004321, 004-321 516 -120 / 240 120 - El- CD4 -322, C04-322, 504 -322 V8 Q Nanuq 3. Nanuq 3, Nanuq 3 VI - )< Plan: CD4 -25, Plan C04 -2511, CD4- 25L1wp12 V 1 -- O Nanuk 2, Nanuk 2, Nanuk 2 51 - - a- CD4- 25wp12 -15 /210 150 -150 / 150 200 50 -180 / 180 - 180 / 180 2 Travelling Cylinder Azimuth (TFO +AZI) [1 vs Centre to Centre Separation [100 ft/in] Travelling Cylinder Azimuth (TFO+AZI) [ vs Centre to Centre Separation [25 ft/in] 0116..... I Ate""° C04-25wp12 GLOBAL FILTER APPLIED: All wellpaths within 200'+ 100/1000 of reference SECTION DETAILS 10:59, August 17 2010 CD4- 25wp12 Sec MD Inc Azi TVD +N / -S +E/ -W DLeg TFace VSec Target 1 36.30 0.00 0.00 36.30 0.00 0.00 0 00 0 00 0 00 20000.00 To 21519.15 Ellipsoid Color 2 350.00 0.00 0.00 350.00 0.00 0.00 0.00 0.00 0.00 - - 3 903.44 11.07 211.00 900.00 -45.68 -27.45 2.00 211.00 -27.45 SURVEY paw, 4 2567.81 61.00 211.002203.73 - 858.63 - 515.92 3 00 0 00 - 515.92 amn r..m oeom m &9-26.3% 36 - . - - - _ - 250 1250 1500 3500 4250 9250 11750 19750 21250 5 6272.91 61.00 211.004000.00 - 3636.32 - 2184.92 0 00 0.00 - 2184.92 13300 ti is coisyz(Nen C04-2S) 250 500 1500 - --- 1750 4250 - - - - -- 5250 11750 14250 21250 22250 6 6872.91 67.00211.004262.90 - 4098.36 - 2462.54 1.00 0.00 - 2462.54 PM C09-25) 7 11702.57 67.00 211.006150.00 - 7909.09 -4752.26 0.00 0.00 - 4752.26 500 750 1750 - - - -- 2250 5250 6250 14250 16250 22250 23250 8 13603.13 72.19 272.006872.60- 8693.11 - 6231.07 3.00 96.93 -4750.24 750 -- 1000 2250 -- 2750 6250 7750 16250 - - - 18250 23250 - - 24000 9 14393.48 74.50285.007100.00 - 8580.96 -6977.95 1.60 81.41 - 4300.59 1015241.23 76.00315677320.80 - 8171.86 - 7675.55 3.50 91.18 - 3611.87 1000 1250 275D 3500 7750 9250 18250 19750 24000 24500 11 15552.32 76.00 315.677396.08 - 7955.94 - 7886.47 0.00 0.00- 3322.20 12 15889.58 83.00 325.347457.65- 7700.31 - 8096.74 3.50 54.59 - 2997.79 1316075.22 83.00331.897480.30 - 7543.11 - 8192.64 3.50 90.40- 2813.96 14 16823.56 83.00 331.897571.50 - 6887.96- 8542.61 0.00 0.00 - 2071.20 15 16912.26 86.00 331.897580.00 - 6810.10 - 8584.20 3.38 0.00 - 1982.92 16 17031.24 86.00 331.897588.30 - 6705.40 - 8640.12 0.00 0.00 - 186423 17 17061.24 86.00 331.897590.39 - 6679.00 - 8654.22 0.00 0.00 - 1834.30 18 17194.57 90.00 331.897595.05 - 6561.49 - 8716.99 3.00 0.00 - 1701.07 19 17249.91 91.66 331 897594.24 - 6512.69 - 8743.06 3.00 0.00 - 1645.75 20 17580.04 91.66 331.897584.68 - 6221.62 - 8898.55 0.00 0.00 - 1315.75 21 17621.35 90.42 331.887583.93 - 6185.20- 8918.01 3.00 - 179.74- 1274.45 22 21519.15 90. 42331.887555.30 - 2747.4310754.80 0.00 0.00 2623.24 C04- 25wp07 Toe 0 / 360 0 / 360 201 50 -30 / 330 / /, 30 LEGEND -30 / 330 30 %; l / i -� CD4 -05, C134-05, CD4-05 VO X CD4 -16, CD4 -16, 00416 V2 i ��/ � / - CD4 -17, CD4 -17. CD417 V13 '' / / )( CD4 -210, CD4 -210, CD4 -210 V3 - -60 /3 00 / /� // - 6 0 O CD4 - 213. CD4 -213, CD4 -213 V4 -60 / 30O 60 1 1 �. "' $- 001213, 004213, CD4- 213wp06 VO - _ , s'v '� "" - A CD4 -214, CD4 -214, CD4 -214 V3 I CD4 -215, CD4 -215, CD4 -215 V4 _ O CD4 -23, CD4-23, CD4-23 VO - o CD4 -23, CD4-23P61, CD4 -23PB1 VO )( CD4 -23, CD4-23PB2, 004 -23PB2 VD A C04 -24, CD4 -24, 00424 VO -90 / 270 90 - 0- CD4 -24, CD4- 24PB1, CD4 -24P01 VD -90 / 270 90 X CD4 -24, CD4-24P62, CD4 -24PB2 VO -0- CD4 -26, CD4-26, 004-26 VO -l- CD4 -318, CD4318, CD4 -318 V6 -9- C04 -318, CD4 -318A, 054318605 O CD4 -316, CD4310P61, CD4- 316PB1 V3 1 C04 -319, CD4-319, 004319 V5 - _ A CD4 -320, CD4-320. 004320 V7 - - 1. . CD4 -320, CD4-320PB1. CD4-32DPB1 V4 • -120 / 240 120 X CD4321, CD4321, CD4321 V16 -120 / ‘11j- 120 -8- CD4 -322, CD4 -322, 004322 V8 Nanuq 3, Nanuq 3, Nanuq 3 V1 X Plan. CD4 -25, Plan CD4 -25L1, 004- 25L1wp12 V 1 O Nanuk 2, Nanuk 2, Nanuk 2 V1 -B- 004-2549512 -150 / 210 101 150 150 200 50 -180 / 180 - 180 / 180 c ) Travelling Cylinder Azimuth (TFO +AZI) [1 vs Centre to Centre Separation [100 ft/in] Travelling Cylinder Azimuth (TFO+AZI) [ vs Centre to Centre Separation [25 ft/in] u. i C D4 25w p 12 WELLBORE TARGET DETAILS (MAP CO- ORDINATES) Name TVDSS +N/ -S *E1 -W Northing Eashng Shape �7 �d.I�GS �� 2010 CD4- 25wp07 Toe 7500.00 - 2747.43 - 10754.80 5954590.00 1506944.00 Point Q U a igN r RA,' 0 ", Qr CD4- 25wp07 Toe Circle 7500 00 - 2747.43 - 10754 80 5954590.00 1506944.00 Circle (Radius 1320.00) 15140 -TD 13334 -TD 1165$1 -TD - w 1.70 D4 +, o G °c, °o$Q�'� G°., �� V" GO 3000 — f 3 .. CD4- 303PB1wp0; N =G `- G , 1 G° OA in G O 1 29 B44Q in — L- IWN:1,_. 1 N I \ .......... 0 1 C C D4 -318 _��r�'z� % %' - �- ' • 13565 -TD calk . � ��,,.,,� , 1 G°301A Q1'. ' ' 0 I A ��� 1 - 3000 — IV", VW . , , 1 ! a 1 . � / G ® p�3 ♦ i1 141 Q�� / ;' �� C p4- 01 Z ! ° q.320 �- - 6 000 � Q �S � 0 17031 -TD ( , G °° ° �� °s • -9000 ' v� � 1,G G° .' G °A VII 1 -12000 1 Co -18000 -15000 -12000 -9000 -6000 -3000 0 3000 6000 West( -) /East( +) (3000 ft/in) Operdw: Cwloc0Pll11,s(AS80)Inc. -WN5 Grid CwtectN.: -0.96 • Job NO: PN /A 9e1* Western 1.10(11i 3105.8 Magnetic DecFdbn: 2038 • AK NO: tN /A Wet CD4- 255(912 DP : 80d9 • APING: RN /A Rig MA Dpdeppw 100 11 System (IV 0) R.Nrenw: Meon Sea level 5 wise Location Original VS Plane: 332.00 Parent Wet 5Im:c06 -25 X 1517781 .31 n View VS Plane: 332.00 ° RRRlaya: 55.30 It 3 595716116 n UnitSynssn API Based /559 Sectbn(VS) Reference: 9Id Comments: POOL: .:,n law 1 8 8 8 8 8 8 8 8 8 1 8 8 8 8 8 CD4- 25wp12 Plan: 17031' to 21519.15' MD ( t 5962000 CD4 -05: 15140' to 21142' MD (12 5 8) - __ 5961000 CD4 -17: 13334'to 17975' MD ( 2642) I _ - CD4 -24: 13565' to 19530' M D (1 3 0) CD4 -26: 16581' to 24749' M D ( 2 0 8 2) 1 I ___ - —I 1 - 5959000 E 5958 • °_ 1 i t _ -_ 5957000 _ -- 1 1 . �+, , _ — I .___ -5956000 z° � .. - ._._._. -- 1 -- -�-�- -- -- --- 5955000 2a € [ v _ - . __ � .__. ... - - ....._ � I - _____ 5954000 CD4- 25wp12 Plan —e —CD4 -05 — CD4 -17 Section View i - - - -� - � - - - -- 5953000 CD4 -24 — CD4 -26 t 41111LIF:E 5952000 € T — __ — 5951000 I . p i . - -._� _ 5950000 ' ' - - 5949000 I _ __ -- 5948000 5947000 In East ( +) /West ( -) N o o i \ • (D N r k3/ P p - ' . 4 - - - 1.. ,...Wq.' t ' Verficd Sect Ion Bong View VS Plane' 0. r te, Combo Preview Page 1 of 1 (CD4- 25wp12 Toolbox)ds) 8/17/2010 11:55AM Closest in POOL Closest Approach: Reference Well: CD4- 25wp12 Plan Offset Well; CD4 -05 Coords. - Coords. - ASP ASP 3 -D ctr -ctr rr,Lr n d ,I r ., Meas. Incl. TRUE Subsea N( +) /S( -) View VS Meas. Incl. TRUE Subsea N( +) /S( -) View VS Distance. 1' _r,. -> 1rd11 : ,-- Depth Angle Azi. TVD E( + ) /W(- (332) ,:omments Depth Angle Azi. TVD E( +) /W(- (332) ;omments PUUL Mtn I'UUL Min Distance (1257.94 Distance (1257.94 ft) in POOL (17031 ft) in POOL (17031 - 21519.15 MD) to - 21519.15 MD) to CD4-05 (15140 - CD4-25wp12 Plan 1257.9 .12...,: : - -= 2=-3=e.E 21519.15 90.42 331.88 7499.943 5954591 1506943 2623.227 21142 MD) 15115.5 87.04 322.43 7495.7 5955758 1506474 3971.97 (15140 - 21142 MD) Closest Approach: Reference Well: CD4- 25wp12 Plan Offset Well: CD4 -24 Coords. - Coords. - ASP ASP 3 -D ctr-ctr I Ir. 4. 1 ■. ' -- - -ea Meas. Incl. TRUE Subsea N( +) /S( -) View VS Meas. Incl. TRUE Subsea N( +) /S( -) View VS Distance. Catan.i _,. - - --. s-- Depth Angle Azi. TVD E(+) /W(- (332) Comments Depth Angle Azi. TVD E( +) /W(- (332) .lomments PUUL Mtn PUUL Mtn D (1930.59 Distance (1930.59 ft) in POOL (17031 ft) in POOL (17031 - 21519.15 MD) to - 21519.15 MD) to CD4-24 (13565 - CD4- 25wp12 Plan 1930.6 - „ _ , a_ 17031.24 86 331.89 7532.88 5950599 1508992 - 1864.23 19530 MD) 15314.26 90.63 349.94 7520.43 5950904 1510899 - 2453.29 (13565 - 19530 MD) Closest Approach: Reference Well: CD4- 25wp12 Plan Offset Well: CD4 -26 Coords. - Coords. - ASP ASP 3-D ctr-ctr r , , te II :1.a -- ,._,., Meas. Incl. TRUE Subsea N( +) /S( -) View VS Meas. Incl. TRUE Subsea N( +) /S( -) View VS Distance. t- ..use Indi. Depth Angle Azi. TVD E( +) /W(- (332) omments Depth Angle Azi. TVD E( +) /W(- (332) :.omments PUUL Mtn PUUL Mtn Distance (2082.52 Distance (2082.52 ft) in POOL (17031 ft) in POOL (17031 - 21519.15 MD) to - 21519.15 MD) to C0426 (16581 - CD4-25wp12 Plan 2082.5 _..11H.1 , , 21519.15 90.42 331.88 7499.943 5954591 1506943 2623.227 24749 MD) 17663.05 89.96 333.64 7554.72 5953693 1505064 2673.85 (16581 - 24749 MD) • Closest Approach: Reference Well: CD4- 25wp12 Plan Offset Well: CD4 -17 Coords. - Coords. - ASP ASP i 3- Dctr -ctr ' .== = p an:;. - -- Meas. Incl. TRUE Subsea N( +) /S( -) View VS Meas. Incl. TRUE Subsea N( +) /S( -) View VS Distance. IA, 1,eie _etee-,,__ Depth Angle Azi. TVD E( +) /W(- (332) :omments Depth Angle Azi. TVD E( + ) /W(- (332) ;omments PUUL Mtn PUUL Mtn Distance (2642.47 Distance (2642.47 ft) in POOL (17031 ft) in POOL (17031 - 21519.15 MD) to - 21519.15 MD) to '',1::%J CD4-17 (13334 - CD4- 25wp12 Plan 2642.5 2- ='.t~' - tU.'.r<. -1, 21519.15 90.42 331.88 7499.943 5954591 1506943 2623.227 17975 MD) 13309.32 88.13 329.1 7433.56 5956987 1508054 4291.18 (13334 - 17975 MD) Neaal � ' PoolSummaryl 8/17 /2010 12:14 PM • • CD445wp12 Surface Lgcatiorr tPA ,,.J. MI Ltsof' .1 From: H:: , ''tr. = - - :fi: -....:,,,,,:,:::::::::,,, 10: 17 • . .:, I, Zone: , !: Datum: a : 1 -- - Region: A„ _-; Regio lalaska . , : D. NAD27 : r_ Latituclil..eng4l00,,,,:iii::: Decimal D egrees w- , ,,::,,,,,,, ::: ::::::: _ -.. : ., -_- - : , . I -=. : if Tly1 : Zone '':"t - r South -..- : : ,,': C LliTl4 : illr::' ':::::::1 ,i S ou t h . .--• 13 , ' ' r ''''' ..... 6 : i ,11 t 1111 ' : del1 :11 6 : 1 ::: itucl:; eci:alDegre: iuft i es -,,:--- ,, , , ,', ,,,ZonOil Etim State Plane Zone:11::!4n"Itf1-1;7771' C State Plane True Un - 1, ,, ( :ii f 4i -- 7.fil,; : : : t'iltcg-4(i.1 . 4,,D 7 . " 1 , 7 ,1" : 41inh : ,1 _-,, - i :-,; 1_ ' ''!:': !':.egal:,:crOpc,rigifirtiif!NIAP:?, oil Y), [ , _ , . ,:,::r,,:::::::::: --. r-Le0,1 ,':::,,,,!,,:,'::::' ::::::::::: :: :„ ..,„_ ::::::::::::::::::, :::: SX'01l/l'bgrCitiordiriates: :,,::: --- - X: . 1517741.31 . -, : _ _ ::: Township 1011 F r R ange: robr IED!r-.) ---..: --- , -„-: ' y '" -- : = , - ,__ 115957161. 4 111:, - me -- -- -__i ti =,- - , c1 - ian:,: -- soctioo,.15 _,_ , - __- 1F1tr 044 5 y : - 13002 5 ' 1FEL r-4 35.17831 1 ' - TD 1 ' Transform Qu 2:i... , r., =3::: Lil Hel CD445wity.12 Intermediate Casing .....„. „......... , F rem:,.-----1--7 ---.7:::::::,,,, r _ .: Datum: ffi- Region: ' ! alas117f;3;!' ' Datl-,1q ,11;,177JA ..ir_ - :: RegI:Ot17 --"=- alaska ..1:;/,: i rkiADEI ".j,.-„-ii 1" ' " - ' r ---""- :1 1:""""1:: 'C'- . - -T.Latitgde ', 1'; ,- 6 111 9itLiO Decimal Degrees : ^97'. 1: llf,11 ill:Ill1r ILa!ltu'Clel_L cingltud. : Decimal Degrees : ''"'''': " : " " ' 1 ---- r;t r. -- r uTm 1!!: : :::-..- Zone: 1:: r - :,,::::::.: :r UTM --!=!==-' !7t1 6 : 1 Tru e -, 5 600,ITD.,.. _Units: pi-.,-,.. ., ::r ,li:: r -- C' 9tat'efPlene ..... Ii:nits: rD: us-ft , i'_ . r. Dro1i - -0! :r r - : 1 : Des (RAD IH 6farting ates: - : - ''':":': ", ,;: : i rr -"::: -:iii::::,:::::::: - ::: :: : : , , : l .:::,,iiiiii , ii,:: ; ,,, i ., - -.." X:: - 1508993.64 ,,:, :. -, -- Township: 1011 : IF1 A:rnange3),1[704.7 ,: E :-:„'''''!'l N;::,1"6 ,: :'-fiti= ---: Nteriaian'.- A1!":" ::: _$...c!cio FIFCLT , ..! [4431.6369 IFEr 15556.575 1.. ..,..), .:L ... 777.f,:iL a 4 ..,_ "if Help _._ -,-„--- jk:,:i1H:::::: ii„L _ „:_j1 : :: ,I,1,111 : 110 : : : : : :: .„,,,„, -- • -,- „ : ,. : :: : :, r) r,,) rN i\j 41 , i , , k:,-,) ) - „III • • t,,h CD4-25wp12 TD : , 7.11!t � d 1 NI 1 rlivfrIwirottl olopoph r Erom: ,— ,„ „„„::„„,„,„:„:,,:,, :: 1 , v iork ;: :- alaska '... i i 1 : ::!4!!!!:::! ' D atum: l'NAD 83 LT ”' 1 i Datum: INAD27 J ---- J n -?! e9i9n: I alaska L7 1 ,. " : ' I D ree r" Latitude/Longitude ID ecima - e s g - ' il_ rd .Decimal_f3egrees South th 1 i''''' LITM Z ',',:': ,,, :itine: , Trin4; _ r f!!r ------ la UTM - ''' ' :!;1: " I ' I ' ll '!'' 1:1 : :1 ::L :: Zone: 11"--- r '...9.,:vt?:1 , . c 7! ,at6 Plane , !Zol ,, Vy.! , ! True 1 :, :!::: '11 _ .",,, , " ,., : v ': , - Ufilks: us el, ' Units l i -ft ....j !:: °-- --; 1 ' ' Stata Plana , 147 --- ,--- -,, 1 ,,:,,:!!; ,,,,:,I,,i, . 1 - =d ad Legal l:/ tier„ (N A 0? -- Oill9) I ... ' 1 n, iN,P,12:-A arvd, -..: :;::; r : - - - =- - ■441,1,... .. ,:1,4,1,!.114.41a.,. __:: ........ -.......... _: : , , Starting Coordinates; . ,,,, ,, ,, ,..: .... , ''''' Legal I . rfr --„: ----: =- = : !, :- . IE :11! _==X: -_-=-, E 1506944.00 -, d_ 1 Town rp. : h'' : ' : ' : ' !: r011 in P 004 ,,,,. y.,, 15964596707 dIll: , - ,d,, __- : M , iro-----H7"7-' ,: ,,:;:!: 5 !!1' ,ti°rt H!:!:L 27 i31730 32526 94 d, FEL ..- ,,,, _ —. ...... Fi7: 1476.-_-161,,,::,,,:,,,,:::::: _ Quik Help , :,: „: : , . .. L:: ...J ::::::: d: "'" ' " f ........ - ' 7 '...."' .. ..Yi.;:■iiiEirri-i . , : _ „:: __ , ' - , r)rlirmAt 't -,,, :4, 0, 4 , 4-, , , ., ,,,,,, , • • REV DATE BY CK APP DESCRIPTION REV DATE BY CK APP DESCRIPTION 8 2/25/08 CZ GD C.A. UPDATED PER K08001OACS 9 4/02/09 CZ DB C.A. UPDATED PER K090003ACS CD4 TO ALPINE 9 0 " z ACCESS ROAD ',1, �? ,..,41."'- El me' pilaw 1 CO -2 LOCATION OF � pir THIS SURVE _ilk. o I I rar IS , , m -I i i iiY , j e M '. I ¢T rd 1 e R IT DEVELOPMENT SATELL E �, ∎■ �■�.,_ VICINITY MAP NOT TO SCALE I, G ck OP D GO" ES� DES\GN SHO ULDER OF PPD CD -4 PAD Q i 0000tpaQa000 TAK\FARM to N,-' NN N d U c):• U •• • , _ ,n Nc'n ® ,* 8 • �� • _ —!•' �• ///.�.����•M0 1 u E 1 IN I BS o o • • • • ` - 10N 1 OD �S ULE • " :_ "� ROD U C N, 20' �� P NEPZ �� is PIGGI o mcml ' ►i MO DULE FUEL ► a SWD PLANT N CD- 4TO ALP INE_ • PIPELINE AS PC 1 3'27'50" � g LCUF w w z Z LEGEND: KU U KP I K N 0 PROPOSED CONDUCTOR F F • EXISTING CONDUCTOR III , Lcmf u n ® EXISTING WELLHEAD r i +a6L e1.e"�.•Anchorage,,W.wWM IO°nx"•'e'° ABANDONED WELL ao i � " one (son sio<�as A lpine Survey Office ALPINE MODULE: CD40 UNIT: CD Conoc•Phillips ALPINE PROJECT CD -4 WELL CONDUCTORS Alaska, Inc. AS —BUILT LOCATIONS CADD FILE NO. DRAWING NO: PART: REV: 05- 03- 03 -1B -1 10/11 CE —CD40 -121 1 OF 3 9 Li iia' i Ul d • 0 REV DATE BY CK APP DESCRIPTION REV DATE BY CK APP DESCRIPTION 5 2/25/08 CZ GD C.A. UPDATED PER K080010ACS 6 4/02/09 CZ DB C.A. UPDATED PER K090003ACS ALL CONDUCTORS ARE LOCATED IN PROTRACTED SEC.24, T 11 N, R 4 E, U.M. SEC.LINE 0/S EXIST. WELL 'Y' 'X' LAT.(N) LONG.(W) FSL FEL GND PAD C04 -X98 5,957,282.22 1,518,247.43 70° 17' 31.873" 150° 59' 20.893" 2407' 31' 12.4 19.1 CD4 -X99 5,957,277.98 1,518,227.75 70' 17' 31.828" 150' 59' 21.464" 2402' 51' 12.4 19.0 CD4 -301B 5,957,273.28 1,518,208.24 70° 17' 31.779" 150° 59' 22.030" 2397' 70' 12.4 19.0 0D4 -302 5,957,268.38 1,518,188.64 70' 17' 31.728" 150' 59' 22.599" 2392' 90' 12.4 19.6 CD4 -303 5,957,263.99 1,518,169.26 70' 17' 31.681" 150' 59' 23.162" 2387' 109' 12.4 19.6 I CD4 -304 5,957,259.26 1,518,149.87 70' 17' 31.632" 150' 59' 23.725" 2382' 128' 12.4 19.5 C04 -05 5,957,254.43 1,518,130.28 70° 17' 31.581" 150° 59' 24.293" 2377' 148' 12.4 19.5 CD4 -306 5,957,249.76 1,518,110.87 70° 17' 31.532" 150° 59' 24.857" 2372' 167' 12.4 19.6 CD4 -07 5,957,245.29 1,518,091.49 70° 17' 31.485" 150° 59' 25.419" 2367' 186' 12.4 19.7 004 -208 5,957,240.13 1,518,071.80 70' 17' 31.431" 150' 59' 25.991" 2362' 206' 12.4 19.8 CD4 -209 5,957,235.77 1,518,052.15 70' 17' 31.385" 150' 59' 26.561" 2357' 226' 12.4 19.7 • CD4 -210 5,957,230.92 1,518,032.98 70' 17' 31.334" 150' 59' 27.118" 2352' 245' 12.4 19.6 CD4 -211 5,957,226.94 1,518,013.75 70' 17' 31.292" 150° 59' 27.676" 2348' 264' 12.4 20.0 C04 -212 5,957,222.25 1,517,994.40 70' 17' 31.243" 150' 59' 28.238" 2343' 283' 12.4 19.6 CD4 -213 5,957,217.19 1,517,974.60 70' 17' 31.190" 150' 59' 28.812" 2337' 303' 12.4 19.9 CD4 -214 5,957,212.46 1,517,955.51 70' 17' 31.140" 150' 59' 29.367" 2332' 322' 12.4 19.8 004 -215 5,957,208.07 1,517,935.87 70° 17' 31.094" 150° 59' 29.937" 2327' 341' 12.4 19.8 004 -16 5,957,203.17 1,517,916.63 70' 17' 31.043" 150' 59' 30.495" 2322' 361' 12.4 19.5 004 -17 5,957,198.80 1,517,897.14 70° 17' 30.997" 150' 59' 31.061" 2318' 380' 12.4 19.5 CD4 -318A 5,957,193.71 1,517,877.38 70' 17' 30.944" 150° 59' 31.634" 2312' 400' 12.4 19.6 004 -319 5,957,189.64 1,517,857.90 70° 17' 30.900" 150° 59' 32.200" 2308' 419' 12.4 19.7 I 004 -320 5,957,185.03 1,517,838.65 70' 17' 30.852" 150' 59' 32.759" 2303' 438' 12.4 19.7 004 -321 5,957,180.22 1,517,819.26 70° 17' 30.802" 150° 59' 33.322" 2298' 458' 12.4 19.0 CD4 -322 5,957,175.24 1,517,799.90 70° 17' 30.749" 150' 59' 33.884" 2292' 477' 12.4 19.0 C04 -X23 5,957,170.76 1,517,780.38 70° 17' 30.702" 150° 59' 34.450" 2288' 496' 12.4 19.0 004 -X24 5,957,166.23 1,5-1- 7,760.82 70'- 17' 30.655" 150' 59'- 35.018 2283' _ 516' -1 -2.4 19.0 CD4 -X25 5,957,161.34 1,517,741.31 70° 17' 30.603" 150° 59' 35.584" 2278' 535' 12.4 19.0 C04 -X26 5;957,157.10 1,517,721.97 ' ` 70' 17' 30.558" 150' 59' 36.146" 2 554` 12.4 19.5 - CD4 -227 5,957,151.94 1,517,702.56 70° 17' 30.505" 150° 59' 36.709" 2268' 574' 12.4 19.6 C04 -X27 5,957,150.77 1,517,697.37 70' 17' 30.492" 150' 59' 36.860" 2266' 579' 12.4 18.4 ' C04 -X28 5,957,146.24 1,517,678.39 70° 17' .30.445" 150° 59' 37.411" 2261' 598' 12.4 18.8 KUUKPIK NOTES: Will � 1. COORDINATES SHOWN HEREON ARE ALASKA STATE PLANE, ZONE 4, NAD 83. 7 ' 7- 7 2. ELEVATIONS SHOWN ARE BRITISH PETROLEUM MEAN SEA LEVEL (B.P.M.S.L.) b^ °m° °,.,�„� Alpine Survey Office IV" ALPINE MODULE: CD40 UNIT: CD C.noc.Phillips ALPINE PROJECT CD -4 WELL CONDUCTORS Alaska, Inc. AS -BUILT LOCATIONS CADD FILE NO. DRAWING NO: PART: REV: 05- 03- 03 -1B -2 10/11/05 CE -CD40 -121 2 OF 3 6 ti ..i .R ��Ki� ii t� L ..nfy , r :. .. S • REV DATE BY CK APP DESCRIPTION REV DATE BY CK APP DESCRIPTION 5 5/25/08 CZ GD C.A. UPDATED PER K080010ACS 6 4/02/09 CZ DB C.A. UPDATED PER KO90003ACS NOTES: 1. ALL COORDINATES SHOWN ARE ALASKA STATE PLANE, ZONE 4, NAD 83. 2. ELEVATIONS SHOWN ARE BRITISH PETROLEUM MEAN SEA LEVEL. ORIGINAL GROUND ELEVATIONS WERE DERIVED FROM THE AVERAGE ELEVATION ALONG THE TOE OF THE CD -4 GRAVEL PAD. 3. BASIS OF COORDINATES: ALPINE PERMANENT CONTROL MONUMENTS PER SURVEY BY KUUKPIK /LCMF, OCTOBER 2005 4. DATES OF AS -BUILT SURVEYS: WELL CONDUCTORS CD4 -208, CD4 -209, CD4 -210 CD4 -318A, CD4 -319, 10/11/05, FB 2005 -26 PGS. 30 -31; CD4 -05, CD4 -306, CD4 -07, 04/13/06, FB 2006 -10, PGS 26, CD4 -320, 04/14/06, PG 29; CD4 -302, CD4 -303. CD4 -304, CD4 -16, CD4 -17, 04/18/06, PG 47; CD4 -211, CD4 -213, CD4 -214, CD4 -215, 04- 26 -06, FB 2006 -10, PGS 65 -66; CD4 -301B, CD4 -321, 5/13/06, FB 2006 -13, PG. 27; CD4 -322, CD4 -X23, CD4 -X24 CD4 -X25, 03/30/07, FB 2007 -08, PGS. 4 -5; CD4 -X26, 5/3/07, FB 2007 -09, PG. 42; CD4 -X98 & CD4 -X99, 4/2/09, FB 2009 -05, PG. 41; CD4 -X27 & CD4 -X28, 4/9/09, FB2009 -05, PG. 55. 5. CD4 -212 IS EXISTING WELL NANUQ #5. REFERENCE DRAWING CE -AP00 -162. CD4 -227 IS EXISTING WELL NANUQ #3 (ABANDONED). REFERENCE DRAWING CEA -M1 XX- 60D380. SURVEYOR'S CERTIFICATE .4 ` CERTIFY THAT I AM ALq44. TO PRACTICE LAND SURVEYING PROPERLY REGISTERED AND LICENSED IN OF ALASKA, THAT OF THIS • �P "•'•••.. • AS -BUILT REPRESENTS A SURVEY MADE BY ME OR UNDER MY DIRECT .• •. ••. 9 �� SUPERVISION, THAT THE MONUMENTS SHOWN HEREON ACTUALLY EXIST i • j - • AS DESCRIBED, AND THAT ALL DIMENSIONS AND OTHER DETAILS ARE *• 49th � * . CORRECT. • 0 DATE: REGISTRATION NO. LS -5077 • 0 # Donald G. Bruce ' • it ; TF F • • No. LS -5077 ;' � • • •• • • KUUKPIK ♦ ♦� p ROFESS I ow- • � P •, ,........ .- 4 ICF 1S0 1.6101 A, . NM,xap�. Nada 07609 - (907) 279A670 4p v r. Office (90 6]0.4779 Alpine Survey Office ALPINE MODULE:CD40 UNIT: CD C•noc•Phillips ALPINE PROJECT CD -4 WELL CONDUCTORS Alaska, Inc. AS -BUILT LOCATIONS CADD FILE NO. DRAWING NO: PART: REV: 05- 03- 03 -1B -3 10/11/05 CE -CD40 -121 3 OF 3 6 CD4 -25 Schlumberger " '' " CemCADE "'Preliminary Job' "'' esgr>, ,_ 10 - 3 4 s urface Ca VI - WP12 i Preliminary Job Design based on limited input data. For estimate purposes only. Rig: Doyon 19 Volume Calculations and Cement Systems Location: Alpine Client: CPAI Volumes are based on 250% excess in the permafrost and 50% excess below the Revision Date: 08/10/2010 permafrost. The top of the tail slurry is designed to be at 2,473' MD. Prepared by: Mike Martin Location: Anchorage, AK Lead Slurry Minimum pump time: 230 min. (pump time plus 120 min.) Phone: (907) 263 -4207 ARCTICSET Lite @ 10.7 ppg - 4.49 ft3 /sk Mobile: (907) 748 -6900 email: martin13@slb.com 0.6381 ft 3 /ft x (108') x 1.00 (no excess) = 69 ft 0.3637 ft /ft x (1550' - 108') x 3.50 (250% excess) = 1836 ft < TOC at Surface 0.3637 ft /ft x (2473' - 1550') x 1.50 (50% excess) = 504 ft 3 it 69 ft 3 +1836 ft 3 +504 ft 240 ft 2409 ft 4.49 ft /sk = 37 s Round up to 540 sks Have additional Lead on location for Top Out stage, if necessary. i III Previous Csg. Tail Slurry Minimum pump time: 170 min. (pump time plus 120 min.) < 16 ", 62.6# casing 15.8 ppg Class G + additives - 1.16 ft3 /sk IIII at 108' MD 0.3637 ft /ft x (2973' - 2473') x 1.50 (50% excess) = 273 ft 0.53997 ft /ft x 80' (Shoe Joint) = 43 ft 3 ';.; 273 ft + 43 ft = 316 ft ni 3 / 1.16 ft 3 316 ft /sk = 4, Round up to 280 sks R BHST = 70 °F, Estimated BHCT = 65 °F. < Base of Permafrost at (BHST calculated using a gradient of 2.1 °F /100 ft. from surface) ' 1,550' MD (1,500' TVD) ft PUMP SCHEDULE Stage Cumulative Stage Pump Rate Volume Stage Time Time (b (bbl) (min) (min) 01F Viscosfied Water 5.0 40.0 8.0 8.0 < Top of Tail at Drop bottom plug 0.0 0.0 5.0 13.0 2,473' MD Mix & Pump MP -II 6.0 50.0 8.3 21.3 Mix & Pump ASL 7.0 432.6 61.8 83.1 Mix & Pump Tail 6.0 56.3 9.4 92.5 Drop top plug 0.0 0.0 5.0 97.5 Kickout plug 5.0 10.0 2.0 99.5 Switch to rig 0.0 0.0 3.0 102.5 I Start Displacement 7.0 259.2 37.0 139.5 < 10 -3/4 ", 45.5# casing Slow & bump plug 3.0 9.0 3.0 142.5 in 13 -1/2" OH MUD REMOVAL TD at 2,973 MD (2,400' TVD) Expected Mud Properties: 10.0 ppg, P < 20, T < 20 Spacer Properties: 10.5 ppg MudPUSH* II, P 17 -21, T z 20 -25 Centralizers: As per CPAi program. Mark of Schlumberger • CD4 -25 Schlumherger CemCAD PreIimi' 1' "Nr 'I'' J ob Desigqii 7 51& Intermediate Casing woo:" , loot Rig: Do on 19 9 st' !Sta•e ,1- WP12 9 Doyon Alpine Client: COP Revision Date: 08/10/2010 Volume Calculations and Cement Systems Prepared by: Mike Martin Volumes are based on 40% excess. The top of the tail slurry is designed to be Location: Anchorage, AK Phone: (907) 263 -4207 at 11,370' MD. Mobile: (907) 748 -6900 - email: martin13 @slb.com Tail Slurry Minimum pump time: 310 min. (pump time plus 120 min.) 15.8 ppg Class G + 0.2 %D46, 0.3 %D65, 0.11%B155, 0.4% D167 - 1.16 ft3 /sk 0.2148 ft /ft x (17,035' - 11,370') x 1.40 (40% excess) = 1704 ft 0.2578 ft /ft x 80' (Shoe Joint) = 21 ft 1704 ft + 21 ft = 1725 ft 1725 ft 3 / 1.16 ft /sk = 1487 sks Previous Csg. < 10 -3/4 ", 45.5.# casing Round up to 1490 sks at 2,973' MD BHST = 172 °F, Estimated BHCT = 129 °F. (BHST calculated using a gradient of -2.0 °F /100 ft. below the permafrost) PUMP SCHEDULE Pump Rate Stage Stage Time Cumulative Stage Volume Time (bpm) (bbl) (min) (min) 5.0 40.0 8.0 8 Weight up MudPUSH II 0.0 0.0 10.0 18.0 Mix & Pump 5.0 40.0 8.0 26.0 MUDPUSH II Drop bottom plug 0.0 0.0 5.0 31.0 Mix & Pump Slurry 6.0 307.0 51.2 82.2 Drop top plug 0.0 0.0 5.0 87 Kick out plug 5.0 10.0 2.0 89 Switch to rig 0.0 0.0 3.0 92.2 < Top of Cement at Start Displacement 6.0 759.5 126.6 218.8 11,370' MD Slow, Bump, open DV 3.0 9.0 3.0 221.8 MUD REMOVAL < 7 -5/8", 29.7# casing Expected Mud Properties: 9.6 ppg, P < 14, T < 25. in 9 -7/8" OH Spacer Properties: 11.5 ppg MudPUSH* II, P = 20 - 24, T = 37 - 41 Centralizers: As per COP program TD at 17,035' MD (7,588' TVD) * Mark of Schlumberger 1.!1".dGINAI r I I CD4 -25 g Schlu ber er CemOADE Pr Jo lt0 esig9, 7 -518" later ediate_Casing Rig: Do on 19 2nd Sta•e -� I ai�'nik 1 -NVP12 9 Doyon Alpine Client: COP Revision Date: 08/10/2010 Volume Calculations and Cement Systems Prepared by: Mike Martin Volumes are based on 40% excess. The top of the tail slurry is designed to be Location: Anchorage, AK Phone: (907) 263 - 4207 at 6,011' MD (500' MD above Qannik). Mobile: (907) 748 -6900 email: martin13 @slb.com Tail Slurry, Minimum pump time: 205 min. (pump time plus 120 min.) 15.8 ppg Class G + 0.2 %D46, 0.3 %D65, 0.8% S2 - 1.16 ft3 /sk 0.2148 ft /ft x (7,075' - 6,011') x 1.40 (40% excess) = 320 ft 320 ft 1.17 ft /sk 274 sks Round up 0 sks Previous Csg. < 10 -3/4 ", 45.5.# casing at 2,973' MD BHST = 107 °F, Estimated BHCT = 95 °F. (BHST calculated using a gradient of -2.0 °F /100 ft. below the permafrost) PUMP SCHEDULE Stage Cumulative Stage Pump Rate Volume Stage Time Time (bpm) (bbl) (min) (min) CW1 00 5.0 20.0 4.0 4.0 MUDPUSH II 5.0 30.0 6.0 10.0 Alpine Surface Tail 5.0 57.0 11.4 21.4 Pause 0.0 0.0 5.0 26.4 Water 5.0 10.0 2.0 P8 Pause 0.0 0.0 3.0 31.4 < 7 -5/8 ", 29.7# casing Mud 5.0 305.8 61.2 92 in 9 -7/8" OH Mud 3.0 9.0 3.0 95.6 < Top of Cement at MUD REMOVAL 6,011' MD Expected Mud Properties: 9.6 ppg, P < 20, T < 25. Spacer Properties: 11.5 ppg MudPUSH* II, P = 20 - 24, T = 37 - 41 Collar at 7,075' MD (4,344' TVD) Mark of Schlumberger , (7.; to. I Page 1 of 1 • Schwartz, Guy L (DOA) From: Schwartz, Guy L (DOA) pr 2 v°( - 150 Sent: Monday, August 30, 2010 2:41 PM To: 'Winfree, Michael Alex (Jr.)' Subject: RE: CD4 -25 Permit to Drill Re -Issue Statement Mike, Thanks for the explanation ... I will add to the well files. Guy Schwartz Senior Petroleum Engineer AOGCC 793 -1226 (office) 444 -3433 (cell) From: Winfree, Michael Alex (Jr.) [mailto:Michael.A.Winfree @conocophillips.com] Sent: Monday, August 30, 2010 2:38 PM To: Schwartz, Guy L (DOA) Subject: CD4 -25 Permit to Drill Re -Issue Statement Guy, The original CD4 -25 well was submitted as an Alpine A Sand single lateral horizontal producer for the PTD, and was approved in November 2009 (permit number 50- 103 - 20608 -00). When CD4 -24 penetrated a high quality Alpine C Sand 2,000' to the east of the proposed CD4 -25 bottom hole location it was decided to optimize the well completion to enable full drainage of both sands with one well. The desire to access both the A and C Sand reserves in this location necessitated the addition of a second lateral. The proposed CD4 -25 bottom -hole location was between two existing wells in which both the Alpine A and C Sand are present. In this location the C Sand is near sub- seismic, however CD4 -24, the well to the east, penetrated 35' of gross C Sand so a change in bottom hole location was required to optimize the well spacing for both laterals. Please let me know if you need additional information regarding the CD4 -25 application for a Permit to Drill. Thanks, -Mike Mike A. Winfree Drilling Engineer 907 265 6820 Direct 907.242.0246 Cell 8/30/2010 • TRANSMITTAAL LETTER CHECKLIST } WELL NAME C _ - �-�-, ( L2 5 c--` PTD # (/;6= ‘' Development Service Exploratory Stratigraphic Test Non - Conventional Well / Ts-) . - FIELD: (, ! , /1 �.'- r/ POOL: L L )4! ;? f t , � Circle Appropriate Letter / Paragraphs to be Included in Transmittal Letter CHECK ADD -ONS WHAT (OPTIONS) TEXT FOR APPROVAL LETTER APPLIES MULTI LATERAL The permit is for a new wellbore segment of existing well (If last two digits in Permit No. , API No. 50- - - API number are between 60 -69) Production should continue to be reported as a function of the original API number stated above. PILOT HOLE In accordance with 20 AAC 25.005(f), all records, data and logs acquired for the pilot hole must be clearly differentiated in both well name ( PH) and API number (50- - - ) from records, data and logs acquired for well SPACING The permit is approved subject to full compliance with 20 AAC EXCEPTION 25.055. Approval to perforate and produce / inject is contingent upon issuance of a conservation order approving a spacing exception. assumes the liability of any protest to the spacing exception that may occur. DRY DITCH All dry ditch sample sets submitted to the Commission must be in SAMPLE no greater than 30' sample intervals from below the permafrost or from where samples are first caught and 10' sample intervals through target zones. Non - Conventional Please note the following special condition of this permit: Well production or production testing of coal bed methane is not allowed for (name of well) until after (Company Name) has designed and implemented a water well testing program to provide baseline data on water quality and quantity. (Company Name) must contact the Commission to obtain advance approval of such water well testing program. Rev: 1/11/2008 L I a' .F ''.Field & Pool COLVILLE RIVER, ALPINE OIL - 120100 Well Name: COLVILLE RIV UNIT CD4 -25 Program DEV Well bore seg ❑ P TD #.2091500 Company CONOCOPHILLIPS ALASKA-INC Initial Class/Type DEV / 1 -OIL GeoArea 890 Unit 50360 On /Off Shore On _._ Annular Disposal ❑ Administration 1 Permit fee attached NA 1 2 Lease number appropriate Yes Surface location in ADL 380077; wellbore passes through ADL 384209; top prod interval in 3 Unique well name and number Yes ADL 388902; productive interval open in ADL 380077 and 387209; TD in ADL 387208. 4 Well located in a defined pool Yes COLVILLE RIVER, ALPINE OIL - 120100, governed by CO 443B. 15 Well located proper distance from drilling unit boundary Yes Conforms to spacing requirements of Rule 3, CO 443B: > 500' from exterior boundary. 16 Well located proper distance from other wells Yes CO No. 443B contains no spacing restrictions with respect to drilling unit boundaries. 7 Sufficient acreage available in drilling unit Yes CO No. 443B has no interwell spacing restrictions. 18 If deviated, is wellbore plat included Yes CO No. 443B has no interwell spacing restrictions. Wellbore will be more than 500' 9 Operator only affected party Yes from an external property line where ownership or landownership changes. 10 Operator has appropriate bond in force Yes 11 Permit can be issued without conservation order Yes Appr Date 1 12 Permit can be issued without administrative approval Yes 13 Can permit be approved before 15 -day wait Yes SFD 8/27/2010 14 Well located within area and strata authorized by Injection Order # (put 10# in comments) (For NA 15 All wells within 1/4 mile area of review identified (For service well only) NA 116 Pre - produced injector: duration of pre production less than 3 months (For service well only) NA 17 Nonconven. gas conforms to AS31.05.030(j.1.A),(j.2.A -D) NA [18 Conductor string provided Yes Engineering 19 Surface casing protects all known USDWs NA No Aquifers 20 CMT vol adequate to circulate on conductor & surf csg Yes 121 CMT vol adequate to tie -in long string to surf csg No Qannik to be cemented in 2nd stage. 22 CMT will cover all known productive horizons No Intermediate casing cemented ... slotted liner completion. 23 Casing designs adequate for C, T, B & permafrost Yes (BHL moved and a lateral added to scope of program) 24 Adequate tankage or reserve pit Yes Rig equipped with steel pits. All waste to approved disposal wells. 125 If a re- drill, has a 10-403 for abandonment been approved NA 26 Adequate wellbore separationproposed Yes Proximity analysis performed. Nearest well is CD4 -26 at 19' ctr ctr (300' md) 27 If diverter required, does it meet regulations NA Diverter waiver requested. No shallow gas issues in CRU. 20 AAC 25.035 (h)(2) Appr Date 28 Drilling fluid program schematic & equip list adequate Yes Max Formation pressure = 3535 psi ( 8.66 ppg) will drill with 8.8 -10 ppg mud. GLS 8/30/2010 29 BOPEs, do they meet regulation Yes 30 BOPE press rating appropriate; test to (put psig in comments) Yes MASP =2663 psi Will test BOPs to 3500 psi Of 1 31 Choke manifold complies w /API RP -53 (May 84) Yes 1 32 Work will occur without operation shutdown Yes 33 Is presence of H2S gas probable No H2S not anticipated on the well. 34 Mechanical condition of wells within AOR verified (For service well only) NA 35 Permit can be issued w/o hydrogen sulfide measures Yes H2S not expected; however, rig will be equipped with operational sensors. Geology 36 Data presented on potential overpressure zones Yes Expected reservoir pressure is 8.7 ppg EMW; will be drilled with 9.2 ppg mud. Appr Date 37 Seismic analysis of shallow gas zones NA SFD 8/27/2010 1 38 Seabed condition survey (if off - shore) NA 39 Contact name /phone for weekly progress reports [exploratory only] NA Geologic Date: Engineering Date 3 / Date Commissioner: Commissioner: Come er � ,, , '/e C ' • I` [ k 0 ' p d 1 ) , . La. g / SEAN PARNELL, GOVERNOR ALASKA OIL AND GAS / 333 W. 7th AVENUE, SUITE 100 CONSERVATION COMMISSION ANCHORAGE, ALASKA 99501 -3539 PHONE (907) 279 -1433 FAX (907) 276-7542 Mr. G.L. Alvord Alaska Drilling Manger ConocoPhillips Alaska, Inc. P.O. Box 100360 Anchorage, Alaska 99510 -0360 Re: Colville River Field, Alpine Oil Pool, CD4 -25 ConocoPhillips Alaska, Inc. Permit No: 209 -150 Surface Location: 3002' FNL, 535' FEL, Sec. 24, T11N, R4E, UM Bottomhole Location: 5169' FNL, 1040' FEL, SEC. 22, T11N, R4E, UM Dear Mr. Alvord: Enclosed is the approved application for permit to drill the above referenced development well. This permit to drill does not exempt you from obtaining additional permits or an approval required by law from other governmental agencies and does not authorize conducting drilling operations until all other required permits and approvals have been issued. In addition, the Commission reserves the right to withdraw the permit in the event it was erroneously issued. Operations must be conducted in accordance with AS 31.05 and Title 20, Chapter 25 of the Alaska Administrative Code unless the Commission specifically authorizes a variance. Failure to comply with an applicable provision of AS 31.05, Title 20, Chapter 25 of the Alaska Administrative Code, or a Commission order, or the terms and conditions of this permit may result in the revocation or suspension of the permit. When providing notice for a representative of the Commission to witness any required test, contact the Commission's petroleum field inspector at (907 6 09 -3607 (pager). e to om i is ,'oner DATED this ?da of November, 2009 this ‘ ;ay cc: Department of Fish 86 Game, Habitat Section w/o encl. Department of Environmental Conservation w/o encl. • ili RECEIVED STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMMISSION 20 PERMIT TO DRILL Alaska Oil :34_ runs. Commission 20 AAC 25.005 ,� ,0- Anchorage la. Type of Work: 1 b. Proposed Well Class: Development - Oil • Service - Winj ❑ Single Zone d lc. Specify if well is proposed for: Drill Q • Re -drill ❑ Stratigraphic Test ❑ Development - Gas ❑ Service - Supply ❑ Multiple Zone ❑ Coalbed Gas ❑ Gas Hydrates ❑ Re -entry ❑ Exploratory ❑ Service - WAG ❑ Service - Disp ❑ Shale Gas ❑ 2. Operator Name: 5. Bond: u Blanket U Single Well 11. Well Name and Number: ConocoPhillips Alaska, Inc. Bond No. 59 - 52 - 180 • CD4 - 25 • 3. Address: 6. Proposed Depth: 12. Field /Pool(s): P.O. Box 100360 Anchorage, AK 99510 - 0360 MD: 24332' • TVD: 7542' • Colville River Field 4a. Location of Well (Governmental Section): 7. Property Designan (Lease Nuber): ; • B 5m a `«'' A I D ne O Pool Surface: 3002' FNL, 535' FEL, Sec. 24, T11N, R4E, UM ADL 380077, 384209, , 388 P • Top of Productive Horizon: 8. Land Use Permit: 13. Approximate Spud Date: 2113' FNL, 2203' FEL, Sec. 35, T11N, R4E, UM 380077 12/21/2009 Total Depth: 9. Acres in Property: 14. Distance to 0.5 mi to CRU 5169' FNL, 1040' FEL, Sec. 22, T11N, R4E, UM 2560 • Nearest Property: external boundary . 4b. Location of Well (State Base Plane Coordinates - NAD 27): 10. KB Elevation above MSL: irfeet 55.3 feet 15. Distance to Nearest Well Open - Surface: x - 377708 • y - 5957414 ` Zone 4 GL Elevation above MSL: /Cr e _#o Same Pool: CD4 -05 , 492' @ 24332' '30`) 16. Deviated wells: Kickoff depth: 350 • ft. 17. Maximum Anticipated Press re in psig (see 20 AAC 25.035) Maximum Hole Angle: 91° deg Downhole: 3432 psig • Surface: 2650 psig • 18. Casing Program: Specifications Top - Setting Depth - Bottom Cement Quantity, c.f. or sacks Hole Casing Weight Grade Coupling Length MD TVD MD TVD (including stage data) 24" 16" 62.5# H -40 Welded 80' 36' 36' 116' 116' Insulated Conductor - Pre - installed • /Pa . 13 -1/2" 10 -3/4" 45.5# L -80 BTCM 3002' 36' 36' 3038' 2400' 550 sx AS Lite, 280 sx Class G t' 9 -7/8" 7 -5/8" 29.7# L -80 BTCM 16161' 36' 36' 16197' 7614' 370 sx LTCrete, 280 sx Class G...°2.4, x 6 -3/4" 4 -1/2" 12.6# L -80 IBTM 8332' 16000' 7611' 24332' 7542' liner with pre - pert'd pups/blank liner Zat.1 .6... 3-1/2" 9.3# L -80 EUE 15964' 36' 36' 16000' 7611' Tubing 19 PRESENT WELL CONDITION SUMMARY (To be completed for Redrill and Re -Entry Operations) Total Depth MD (ft): Total Depth TVD (ft): Plugs (measured) Effective Depth MD (ft): Effective Depth TVD (ft): Junk (measured) Casing Length Size Cement Volume MD TVD Conductor /Structural Surface Intermediate Production Liner Perforation Depth MD (ft): Perforation Depth TVD (ft): 20. Attachments: Property Plat ❑ BOP Sketch ❑ Drilling Program 0 Time v. Depth Plot ❑ Shallow Hazard Analysis ❑ Diverter Sketch ❑ Seabed Report ❑ Drilling Fluid Program Q 20 AAC 25.050 requirements 0 21. Verbal Approval: Commission Representative: Date: 22. I hereby certify that the foregoing is true and correct. Contact Mike A. Winfree @ 265 - 6820 Printed Name G. L. Alvord Title Alaska Drilling Manager Signature o �- ( OA !`` Phone 5 -_ G (2_,„ Date ti 06 Z 1 , " `✓` Commission Use Only Permit to Drill API Number: Permit Ap r ov 2 See cover letter fl-o y Number: ,� �--' ! / `-fit` �� 50- /6 7L' (<`C, .f. 6L- Date: / for other requirements Conditions of approval : If box is checked, well may not be used to explore for, test, or produce coalbed me hane, gas hydrates, or gas contained in shales: Er 4r 3 500 P s L. d b P &&./— Samples req'd: Yes ❑ No Mu. = • req'd: Yes ❑ No [„2' Other: Z $00 /p .re.,. Anrt 7:57{_(- ; \ H2S measures: Yes ❑ No Dire . • - s req'd: Yes [+' No Ell •« b1U2 r ilaiu Z "44G 3 5-0,)(4J% �/ �� ��'���� /: r ' PROVED BY THE COMMISSION DATE: + / y / , COMMISSIONER Form 10 -401 (Rev sed 7/2009) his permit is valid f 4 n the ea f pprova 0 A . ' 25.005(g)) Submit in Duplicate • CD4 -25 Drilling Hazards Summary (See Well Plan Attachment: Detailed Risk Information for further discussion of these risks) 13 -1/2" Hole / 10 -3/4" Casing Interval Event Risk Level Mitigation Strategy Conductor Broach Low Monitor cellar continuously during interval. Well Collision Low Gyro single shots, traveling cylinder diagrams Monitor well at base of permafrost, increased mud Gas Hydrates Low weight, decreased mud viscosity, increased circulating times, controlled drilling rates, low mud temperatures Running Sands and Gravel Low Maintain planned mud parameters, Increase mud weight, use weighted sweeps. Lost Circulation Low Reduced pump rates, mud rheology, lost circulation material, use of low density cement slurries 9 -7/8" Hole / 7 -5/8" Casing Interval Event Risk Level Mitigation Strategy Abnormal Pressure in BOPE drills, Keep mud weight above 9.6 ppg. Surface Formations Low Check for flow during connections and if needed, >2000' TVD increase mud weight. Reduced pump rates, reduced trip speeds, real time Lost Circulation Low equivalent circulating density (ECD) monitoring, mud rheology, lost circulation material Reduced trip speeds, mud properties, proper hole Hole Swabbing on Trips Moderate filling, pumping out of hole, real time equivalent circulating density (ECD) monitoring, weighted sweeps. Well control drills, increased mud weight. No Abnormal Reservoir Low mapped faults occur within 700' of the planned Pressure wellbore. Hydrogen Sulfide Gas Low H drills, detection systems, alarms, standard well • control practices, mud scavengers 6 -3/4" Hole / Horizontal Production Hole Event Risk Level Mitigation Strategy Reduced pump rates, reduced trip speeds, real time Lost Circulation Moderate equivalent circulating density (ECD) monitoring, mud rheology, lost circulation material Reduced trip speeds, Pump out to 7 -5/8" shoe, mud Hole Swabbing on Trips Moderate properties, proper hole filling, pumping out of hole, real time equivalent circulating density (ECD) monitoring, weighted sweeps. BOPE drills, Keep mud weight above 8.8 ppg. Abnormal Reservoir Medium Check for flow during connections and if needed, Pressure increase mud weight. Well control drills, increased mud weight. Hydrogen Sulfide Gas Low H drills, detection systems, alarms, standard well control practices, mud scavengers ORtGtt\AL ConocoPhillips Alaska, Inc 1 Post Office Box 100360 Anchorage, Alaska 99510 -0360 ConocoPhillips Telephone 907 - 276 -1215 RECEIVED November 16, 2009 NOV 1 9 bli9 Alaska DIt & Gas Cons. ColnniSSiGn Alaska Oil and Gas Conservation Commission Anchorage 333 West 7 Avenue, Suite 100 Anchorage, Alaska 99501 Re:Application for Permit to Drill CD4 -25 Dear Sir or Madam: ConocoPhillips Alaska, Inc. hereby applies for a Permit to Drill an onshore oil production well from the CD4 drilling pad. The intended spud date for this well is 12/21/09. It is intended that Doyon Rig 19 be used to drill the well. After setting 7 -5/8" intermediate casing, the horizontal section will be drilled and the well completed with pre - perforated pups and blank liner. At the end of the rig work program, the well will be flowed back for 2 -3 days to mitigate reservoir damage prior to being put on production. It is expected that the K2 (Qannik) sand will be considered a significant hydrocarbon bearing zone. After running 7 -5/8" casing, it is planned to pump lead cement, then open a stage tool and pump a second cement job to isolate the K2 with 500' of cement above and below the interval. This will leave a mud gap between the two stages. It is requested that a waiver of the diverter requirement under 20 AAC 25.035 (h)(2) is granted. At CD4, there has not been a significant show of shallow gas or gas hydrates through the surface hole interval. Please find attached the information required by 20 ACC 25.005 (a) and (c) for your review. Pertinent information attached to this application includes the following: 1. Form 10 -401 Application for Permit to Drill per 20 ACC 25.005 (a). 2. A proposed drilling program. 3. A proposed completion diagram. 4. A drilling fluids program summary. 5. Pressure information as required by 20 ACC 25.035 (d)(2). 6. Directional drilling /collision avoidance information as required by 20 ACC 25.050(b). • 1 Information pertinent to the application that is presently on file at the AOGCC is: 1. Diagrams of the BOP equipment, diverter equipment and choke manifold lay out as required by 20 ACC 25.035 (a) and (b). 2. A description of the drilling fluids handling system. 3. Riser setup If you have any questions or require further information, please contact Mike A. Winfree, 265 -6820, or Mark Chambers at 265 -1319. Since -I Mike A. free Drilling Engineer Attachments cc: CD4 -25 Well File / Sharon Allsup Drake ATO 1530 Mark Chambers ATO 1566 Nina Anderson ATO 1706 Liz Galiunas ATO 1706 Ryan Robertson ATO 1708 Tim Schnieder ATO 1768 Lanston Chin Kuukpik Corporation • Procedure 1. Move on Doyon 19. 2. Rig up riser, dewater cellar as needed. 3. Drill 13 -1/2" hole to the surface casing point as per the directional plan. (Directional /MWD). 4. Run and cement 10 -3/4" surface casing. 5. Install and test BOPE to 3500 psi. 6. Pressure test casing to 3000 psi. 7. Drill out 20' of new hole. Perform leak off test. 8. Pick up and run in hole with 9 -7/8" drilling BHA. 9. Drill 9 -7/8" hole to intermediate casing point in the Alpine A. (LWD Program: GR /RES /PWD /Dens /Neut). / c 4 ' 3500 p Sv 10. Run and cement 7 -5/8" casing as per program. Carry out a leak off test down the 10- 3/4 "x7 -5/8" casing annulus to confirm the fracture pressure referenced to the casing shoe. Freeze protect casing annulus and casing. 11. BOPE test to 3500 psi. 12. Drill out 7 -5/8" shoe track. Drill 20' of new hole. Perform formation integrity test. 13. Displace to Flo -Pro drilling fluid 14. Drill 6 -3/4" horizontal section to well TD (LWD Program: GR /RES /PWD /Dens /Neut). • 15. Circulate the hole clean and pull out of hole. 16. Run 4 -1/2 ", 12.6 #, L -80 lower completion with pre - perforated pups and blank liner. 17. Run 3 - %, 9.3 #, L -80 tubing upper completion with SSSV, gas lift mandrels, packer, and landing nipple. 18. Install 2 way check and pressure test hanger seals to 5000 psi. Nipple down BOP. 19. Install tubing head adapter assembly. Pressure test adapter assembly to 5000 psi. Remove 2 way check. 20. Circulate tubing to diesel and install freeze protection in the annulus. ' 21. Drop ball and rod, set packer and test tubing and annulus to 3500 psi / 30 mins. 22. Set BPV and secure well. Move rig off. ORIGINAL • • Well Proximity Risks: Directional drilling / collision avoidance information as required by 20 ACC 25.050 (b) is provided in following attachments. CD4 -26 is the nearest existing well to the CD4 -25 plan at 19' well to well separation at 300' MD. Drilling Area Risks: There are no high -risk events. Lost circulation: Faulting within the Alpine reservoir section is considered to be the most likely cause of lost circulation. Standard LCM material is expected to be effective in dealing with lost circulation. Additional care and attention will be given to the higher potential of inducing a kick when drilling horizontally as opposed to vertically. Good drilling practices will be stressed to minimize the potential of taking swabbed kicks. Annular Pumping Operations: Incidental fluids developed from drilling operations on well CD4 -25 will be injected into a permitted annulus on CD4, ° or the class 1 disposal well on CD1 pad. The CD4 -25 surface /intermediate casing annulus will be flushed with 300 bbls of fresh water prior to freeze protecting with diesel to 2000' TVD. The only significant hydrocarbon zone is the Qannik reservoir and there will be 500' of cement fill above the top of the Qannik as per regulations. Upon completion of CD4 -25 form 10 -403, Application for Sundry Operations, will be filed. Annular pumping of fluids occurring due to drilling operations, per regulation 20 AAC 25.080, could then begin once properly permitted. As stated above, any zones containing significant hydrocarbons will be isolated prior to initiating annular pumping. There will be no USDW's open below the shoe or potable /industrial water wells within one mile of the receiving zone. Reference the enclosed directional drilling plan for other formation markers in this well. Surface casing will be set near the base of the Schrader Bluff Formation (C -40). These 450 -500' thick shales are part of the Colville Group and are known to provide vertical barriers to fluid flow in other areas. The maximum volume of fluids to be pumped down the annulus of this well will not exceed 35,000 bbl without the specific permission of the AOGCC. Fluid densities will range from diesel to a maximum of 12.0 ppg for drilling fluid wastes. Using 12.0 ppg fluid and the rig's specified maximum pumping pressure of 1,500 psi for annular injection, the maximum pressure at the surface casing shoe is estimated by: Max Shoe Pressure = (12.0 ppg) * (0.052) * (Surf. Shoe TVD) + 1,500 psi = (12.0 ppg) * (0.052) * (2400') + 1,500 psi = 2,997 psi Pore Pressure = 1,086 psi Therefore Differential = 2,997 —1,086 = 1,911 psi. The internal casing pressure is conservative, since frictional losses while pumping have not been taken into consideration. The surface and intermediate casing strings exposed to the annular pumping operations have sufficient strength by using the 85% collapse and burst ratings listed in the following table: Wt Connection 85% of 85% of OD (ppf) Grade Range Type Collapse Collapse Burst Burst 10 -3/4" 45.5 L -80 3 BTC -M 2,480 psi 2,108 psi 5,210 psi 4,428 psi 7 -5/8" 29.7 L -80 3 BTC -M 4,790 psi 4,071 psi 6,890 psi 5,856 psi O • • DRILLING FLUID PROGRAM SPUD to Intermediate hole to Production Hole 10 -3/4 "surface casing 7 -5/8" casing point — Section — 6 3/4" point— 13 -1/2" hole 9 -7/8" hole Density 8.8 — 9.6 ppg 9.6 — 9.8 ppg 9.2 ppg PV 10 — 25 10 —15 YP 20 -60 15 -25 25 -30 Funnel Viscosity 100 — 200 Initial Gels 4 — 8 10 —15 10 minute gels <18 12 - 20 API Filtrate NC — 10 cc / 30 min 4 — 12 cc /30 min (drilling) HPHT Fluid Loss at 160 12 - 14 cc /30 min PH 8.5 -9.0 9.0 -10.0 9.0 -9.5 KCL 6 % Surface Hole: A standard high viscosity fresh water / gel spud mud is recommended for the surface interval. Keep flow line viscosity at ± 200 sec /qt while drilling and running casing. Reduce viscosity prior to cementing. Maintain mud weight < 9.6 ppg by use of solids control system and dilution where necessary. Intermediate Hole Section: Fresh water gel / polymer mud system. Ensure good hole cleaning by pumping regular sweeps and maximizing fluid annular velocity. There is potential for lost circulation, particularly after the Nechelik is penetrated. Maintain mud weight at or below 9.8 ppg and be prepared to add loss circulation material. Good filter cake quality, hole cleaning and maintenance of low drill solids (by diluting as required) will all be important in maintaining wellbore stability. Production Hole Section : The horizontal interval will be drilled with a M -I Flo -Pro drill -in fluid. The base fluid will consist of 6% KCI, with ± 30PPB calcium carbonate bridging material to minimize formation damage. Flo -Vis Polymer and Dual -Flo starch will be used for viscosity and fluid loss control respectively. (1 1 11' Y ... ��t • i Completion Schematic Colville River Field CD4 -25 Production Well Completion A" ;,, 16" Conductor to so' Updated 11/13/2009 Sperry Drilling Services N CD4- 25wp06 f Packer Fluid mix: O Inhibited 9.2 - 9.4 ppq 6% KCI Brine illilill with 1500' TVD diesel cap 10-W 45.5 ppf L -80 BTC -Mod Surface Casing @ 3,038' MD / 2,400' TVD GL J cemented to surface Upper Completion MD TVD Top of Cement 1) Tubing Hanger 32' 32' +/- 6,308' MD / 3,884' TVD 2) 4 -W 12.6#/ft IBT -Mod Tubing (2 jts), XO Qannik Interval Top 3) 3-W 9.3 #/ft EUE -Mod Tubing +/- 6,808' MD / 4,111' TVD 4) Camco TRMAX(-5E SSSV (2.812" ID) 2,200' 1,984' with control line to surface 5) 3 -'W 9.3 #/ft EUE -Mod Tubing Ilig a' l 6) Camco KBMG GLM w/ DV 5,241' 3,400' 7) 3-W 9.3 #/ft EUE -Mod Tubing ES Cementer 8) Camco KBMG GLM w/ DV 10,087' 5,600' +/- 7,308' MD / 4,338' TVD 9) 3'W 9.3 #/ft EUE -Mod Tubing 10) Camco KBMG GLM (2.867" ID) w /DCK2 shear 14,917' 7,476' Pinned for 2500 psi casing to tbg shear 11) 3 -W 9.3 # /ft, EUE -M (2) 12) Baker 3.5" X 7 - 5/8" Premier Packer 14,997' 7,493' 13) 3 - '/2' 9.3 #/ft, EUE - M (1) (") GL J 14) HES "XN" (2.75" min ID) @ 66 15,047' 7,500' 15) 3 -' /z' 9.3 #/ft, EUE -M 16) 3 -' /=" 9.3#/ft, EUE -M w/ mule shoe located at 16,003' 7,610' 3 -1/2" 9.3 ppf L -80 EUE M WLEG sub bottom tubing run with Jet Lube Run'n'Seal pipe dope Lower Completion: Top MD TVD 17) Baker 5 -1/2" x 7 -5/8" Flexlock Liner Hanger Assembly (500' up from 7 -5/8" Shoe) 16,000' 7,611' X/O 5 -' /z" Hydril 521 Box x 4 -'/z" SLHT Pin 18) 4-W Blank Liner w /Perforated Pups w/ SLHT TBD 1 Pert Pup every 5 joints X/O 4 -'/" SLHT Box x 4 -%' IBT -Mod 19) 4 -Y2' Blank Liner w /Perforate Pups w/ IBT -Mod TBD 1 Pert Pup every 5 joints 20) Orange Peel Shoe 24,322' 7542' 0 i TOO Calculated @ +/- 10,964' MD / 5,998 ND 1-6 500' MD above the Nanu to " . '�, ■ 0 0 0 0 0 0 0 0 °° 00 00 00 00 00 -: ;;;;, � 18 19 7 -5/8" 29.7 ppf L -80 BTC Mod 6'/ <" Hole TD at • Production Casing @ 16,196' MD / 7,614' TVD at 24,332' MD / 7,542' TVD ORIGINAL 1 PRESSURE INFORMATION (per 20 ACC 25.005 (c) (3,4) and as required in 20 ACC 25.035 (d) (2)) The table below shows data used for calculation of anticipated surface pressure (ASP) during drilling of this well: Casing Setting Fracture Pore Casing Size Depth Gradient pressure ASP Drilling (in) MD/TVD(ft) (Ibs. / gal) (psi) (psi) 16 116 / 116 10.9 52 54 10 -3/4" 3,038 / 2,400 14.5 1,090 1,569 7 -5/8" 16,196 / 7,614 16.0 3432 2,648 N/A 24,332 / 7,542 16.0 3403 N/A • NOTE: The Doyon 19 5000 psi BOP equipment is adequate. Test BOP's to 3500 psi. PROCEDURE FOR CALCULATING ANTICPATED SURFACE PRESSURE (ASP) ASP is determined as the lesser of 1) surface pressure at breakdown of the formation casing seat with a gas gradient to the surface, or 2) formation pore pressure at the next casing point less a gas gradient to the surface as follows: 1) ASP = [(FG x 0.052) - 0.1]D Where: ASP = Anticipated Surface pressure in psi FG = Fracture gradient at the casing seat in lb/gal 0.052 = Conversion from lb./gal to psi /ft 0.1 = Gas gradient in psi /ft D = true Vertical depth of casing seat in ft RKB OR 2) ASP =FPP — (0.1 x D) Where; FPP = Formation Pore Pressure at the next casing point ASP CALCULATIONS 1. Drilling below conductor casing (16 ") ASP = [(FG x 0.052) — 0.1] D = [(10.9 x 0.052) — 0.1] x 116 = 54 psi OR ASP = FPP — (0.1 x D) = 1,090' — (0.1 x 2,400') = 850 psi 2. Drilling below surface casing (10 -3/4 ") ASP = [(FG x 0.052) — 0.1] D = [(14.5 x 0.052) — 0.1] x 2,400 = 1,569 psi OR ASP = FPP — (0.1 x D) = 3,432 — (0.1 x 7,588) = 2,670 psi " 3. Drilling below intermediate casing (7 -5/8 ") 9 9 ASP = FPP — (0.1 x D) = 3,403 — (0.1 x 7,523') = 2,648 psi • 0 DA \ [ Fri: ,7 '1 110 1 1) Cementing Program: 10 -3/4" Surface Casing run to3,038' MD / 2,400' TVD. Cement from 3,038' MD to 2400' (500' of fill) with Class G + Adds @ 15.8 PPG, and from 2400' to surface with Arctic Set Lite 3. Assume 300% excess annular volume in permafrost and 50% excess below the permafrost (1717' MD). Lead slurry: 550 sx ArcticSet Lite 3 @ 10.7 PPG yielding 4.45 ft /sk, Class G + 30% D053 thixotropic additive, 0.6% D046 antifoamer, 1.5% D079 extender, 1.5% S001 accelerator, 50% D124 extender and 9% BWOW D044 freeze suppressant Tail slurry: 280 sx Class G + 0.2% D046 antifoamer, + 1%S2, 0.2 %D46, 0.3 %D65 accelerator @ 15.8 PPG yielding 1.17 ft /sk 7 -5/8" Intermediate Casing run to 16,196 MD / 7,614' TVD First Stage: Cement the first 1000' from 16,196' — 15,196' MD with 15.8 ppg and from 15,196' to 10,964' MD with LiteCrete (minimum 500' MD above the Albian 96 which is the Nanuq Reservoir). Assume 40% excess annular volume. Lead Slurry: 370 sx LiteCrete @ 11 PPG yielding 3.35 ft /sk Tail Slurry: 280 sx Class G + 0.2% D046 antifoamer, + 1 %S2, 0.2 %D46, 0.3 %D65 accelerator @ 15.8 PPG yielding 1.17 ft /sk Second Stage: Cement from ports in a Stage tool set 500' below the K2 interval to +/- 500' above the K2 interval with Class G + additives @ 15.8 ppg. Assume 40% excess annular volume Lead: 260 Sx Class G + 0.2% D046 antifoamer, 0.3% D065 dispersant and 1% S002 accelerator @ 15.8 PPG yielding 1.17 ft /sk 1 By Weight Of mix Water, all other inkttle‘ Easting (3500 ft/in) 111111 1 111111 11 111111 11 1 1 111111 11 111111111 11 1 1 ,I 1 1_1111111 111 ConocoPhillips(Alaska) Inc. -WNS Date prepared:, - Western North Slope 10:34, - November 05 200 9 _ - CD4 Nanuq Pad CD4- 303ST1wp06 = CD4- 212wp04 • — Cil-.V 16 — CD4 -208 CD4-301B CD 1 D4- 7 I4- 208P:� - CD4-3C 4 14-303wp06 -, - CD4 -20 p ; . :. 'i I . - ... ,. -4. :a: CD4 304 ': - o , _ ...._ - _ 4a 0 _,,,......CS _ ' 4 -3 - CD4-301A "'�"` �_;' CD- - 320PB1 - W •›, _ -o CD4 1 8A � k :�� ` '■r - o t ���� CD4 -302 �,.- .,...Z _ .� , ..•_ �� `�� � 'l v '�III� CD4 -2 p05 i, - " B 4 -321 4011,07VDA2 / 11 %* . vie."- p05 T CD4 -320 / -_ CD4 -2' , .05 CD` Z104-209 CDC 2G�,�215 Nanuq 5 CD4 -214 - m A wp05 T5 - i l i l l i l l l l l 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 Easting (3500 ft/in) • 110 Western North Slope HALLIBURTON 1.-' CD4 Nanuq Pad CD4-25wp06 Conoco Phillips Plan: CD4-25 Sperry Drilling Plan: CD4-25 CD4-25wp06 DDI: 7.290 SURVEY PROGRAM Depth From Depth To Survey/Plan Tool 36.30 1000.00 CD4-25wp06 (Plan: CD4-25) CB-GYRO-SS 0 -- - 1000.00 24332.03 CD4-25wp06 (Plan: CD4-25) MWD+IFR-AK-CAZ-SC 1 i 1 , Ob st'9 1, 2 4-1/2" x 6-3/4" CP : 10-3/4" x 13-1/2" I: o -3000 CD4-25wp05 T1 0 _ 0 I cn CD4-25wp05 T2 + I -c 8 CD4-25wp05 T3 z -6000 --, . . o CD4-25wp05 T4 I (/) -9000 7-5/8" X 9-7/8 CD4-25wp05 T5 I \ ■,..... : I : I 1 I I -15000 -12000 -9000 -6000 -3000 0 3000 1 West(-)/East(+) (3000 ft/in) CASING DETAILS TVD MD Name Size 2400.00 3038.16 10-3/4" x 13-1/2" 10-3/4 00 7614.07 16196.93 7-5/8" X 9-7/8" 7-5/8 7542.24 24332.03 4-1/2" x 6-3/4" 4-1/2 10' 20• 30- A go. o C -30 C-20 2500 - - 0 .( 10-3/4" x 13-1/T K-3 Marker Basal K-3 -,-- 0 :_ Basal K-2 -- ---- --- - -- - - - ---__ K-2 Marker TO -2. 5000 0 0 4, > Albian 96 r:) CD K-1 Marker u ju , lis Base HRZ - - "I H HRZ - - - I; LCU-Miluveach 7-5/8" X 9-7/8" ; a) 4-1/2" x 6-3/4" - to- as 7500 -- .,..: A -- — -- — -,'--- - - , --- - c? -- N2 — - -----_—: r Zlo :,;::; I' Alpine A Sand B3 sand Alpine C D ' CD4-25405 T5CD4-25wp05 T4 CD4-25wp05 TT CD4-25wp05 T2 —CD4-25wp05 T-1— -7500 -5000 - 25UU U 2bUU 5000 71,19F1171111 Vertinal Sertior' t ,110:4:u 3 t:oan7500 ftlln% ORIGINAL • 0 ConocoPhillips HALLIBURTON Standard Proposal Report Database: EDM v16 Prod Loc� ordinate R ef e erence: Well Plan: CD4 -25 Comp2ny: „ ConocoPhillips(Alaska) Inc. 1VD Reference: 11 MOP lll' Plan: CD4 -25 (36.3 +19) @ 55.30ft (Doyon 19) Project d - Western North Slope MD Reference: - Plan: CD4 -25 (36.3 +19) @ 55.30ft (Doyon 19) Situ '111 CD4 Nanuq Pad North Reference: ip ''IVp ,' hi. True Well � 'i, l l l l l i No Plan: CD4 -25 - Survey Calculation Method: Minimum Curvature Weilborell II,OIII Plan: CD4 -25 Design: IIC �1' 'Project ;„ Western North Slope Map System: US State Plane 1927 (Exact solution) System Datum: Mean Sea Level Geo Datum: NAD 1927 (NADCON CONUS) Using Well Reference Point Map Zone: Alaska Zone 04 Using geodetic scale factor „Sit :I _ CD4 Nanuq Pad Site Position: Northing: 5,957,908.57ft Latitude: 70° 17' 36.666 N From: Map Easting: 377,794.25ft . Longitude: 150° 59' 22.031 W Position Uncertainty: 0.00 ft Slot Radius: Grid Convergence: -0.93 ° - Well ll. Plan CD4-25 „ - - -- - Well Position +N /-S 0.00 ft Northing: 5,957,414.20ft . Latitude: 70° 17' 31.791 N +E/.W 0.00 ft Easting: 377,707.79 ft - Longitude: 150° 59' 24.316 W Position Uncertainty 0.00ft Wellhead Elevation: ft Ground Level: 19.00ft Wellbore I II ilil Plan: CD4-25 pp,�,,, - „ "II p ". !I Magnetics l Model Name Sample Date Declination Dip Angle .II Field Strength i • ' �, l 0 t.) ( °) (nT) + BGGM2007 11/5/2009 „I 16.39 79.60 57,293 Des' n CD4-25wp06 25wp06 Audit Notes: Version: Phase: PLAN Tie On Depth: 36.30 Vertical Section Depth From +NIS +E/ -W Direction pl!''lil „I, III, - (ft) °I I ,up.,l l (ft)- (ft) i �I Al 36.30 0.00 0.00 331.00 11/10/2009 10 :41 :48AM Page 2 COMPASS 2003.16 Build 69 0 ConocoPhillips HALLIBURTON Standard Proposal Report Databas le lul EDM v16 Prod Local Co- ordinate Reference: Well Plan: CD4 - 25 Company: ConocoPhillips(Alaska) Inc. . I TVD R eference: Plan: CD4 -25 (36.3 +19) @ 55.30ft (Doyon 19 Project: Western North Slope I p,I I MD Reference: ' luudll l IoOliul Plan: CD4 -25 (36.3 +19) @ 55.30ft (Doyon 19) site CD4 Nanuq Pad Nh Rfence True hl - Plan CD4 -25 Survey C re I ll atib n : llll I i {1od III I II I I' Minimum Curvature W'ellbore i Plan CD4 -25 '' Design ; ^ CD4- 25wp06 l a III P I i l mill . :,., - - - - - Plan Sections„.„.,.,,,., Measured Vertical TVD ` Dogleg Build Turn Depth Inclination Azimuth I Pept l h I . System +NI-S +E / - W - - - o Rate - Rate o Rate Taol Face..jgl' (ft) (0) - {) (ft)i II �Vl l l llliil jlli! (ft) (t} { 1 100ftj { Il00ftj { /MOQ' j glll'll :�I) ;II . 1 r ', illl hill iia - - _' - II „' I I IIIIIII .III mil Il lliia ..VIII.. I ri'I�I!IIIIIIIIIIII i IIIPI ill, lilill'�'6 VIII ',,IIIP illll9ll'll 36.30 0.00 0.00 36.30 -19.00 0.00 VIVII110 0.00 0.00 0.00 0.00 350.00 0.00 0.00 350.00 294.70 0.00 0.00 0.00 0.00 0.00 0.00 800.00 9.00 206.00 • 798.15 742.85 -31.70 -15.46 2.00 2.00 0.00 206.00 2,600.00 63.00 206.00 2,201.08 2,145.78 - 947.83 - 462.29 3.00 3.00 0.00 0.00 12,289.45 63.00 206.00 6,600.00 6,544.70 - 8,707.45 - 4,246.91 0.00 0.00 0.00 0.00 12,969.17 63.11 225.08 6,910.30 6,855.00 - 9,197.24 - 4,596.85 2.50 0.02 2.81 94.00 13,482.33 73.37 225.08 7,100.30 7,045.00 - 9,533.31 - 4,933.87 2.00 2.00 0.00 0.00 16,196.93 90.00 321.00 7,614.07 7,558.77 - 9,352.77 - 7,281.59 3.52 0.61 3.53 91.70 16,979.88 89.84 336.66 7,615.14 7,559.84 - 8,684.94 - 7,685.58 2.00 -0.02 2.00 90.57 18,041.13 89.84 336.66 7,618.01 7,562.71 - 7,710.56 - 8,106.05 0.00 0.00 0.00 0.00 18,530.36 90.00 331.77 7,618.67 7,563.37 - 7,270.18 - 8,318.81 1.00 0.03 -1.00 -88.19 18,623.10 90.93 331.77 7,617.92 7,562.62 - 7,188.47 - 8,362.68 1.00 1.00 0.01 0.37 20,532.18 90.93 331.77 7,587.02 7,531.72 - 5,506.61 - 9,265.45 0.00 0.00 0.00 0.00 20,597.71 90.29 331.62 7,586.32 7,531.02 - 5,448.91 - 9,296.52 1.00 -0.97 -0.23 - 166.58 23,279.83 90.29 331.62 7,572.75 7,517.45 - 3,089.13 - 10,571.26 0.00 0.00 0.00 0.00 23,435.43 91.77 332.10 7,569.95 7,514.65 - 2,951.94 - 10,644.62 1.00 0.95 0.31 18.05 24,332.98 • 91.77 332.10 7,542.24 .7,486.94 - 2,159.06 - 11,064.35 0.00 0.00 0.00 0.00 11/102009 10:41:48AM Page 3 COMPASS 2003.16 Build 69 CI U G IN L Closest in POOL Closest Approach: Reference Well: CD4- 25wp06 Plan Offset Well: CD4 -05 Coords. - Coords. - ASP ASP 3 -D ctr -ctr Meas. Incl. TRUE Subsea N( +) /S( -) View VS Meas. Incl. TRUE Subsea N( +) /S( -) Vlew VS Distance. - i Depth Angle Azi. TVD E( +) /W(- (331) Comments Depth Angle Azi. TVD E( + ) /W(- (331) Comments PUUL Min PUUL Min Distance (491.83 ft) Distance (491.83 ft) in POOL (16196 - in POOL (16196 - 24332.03 MD) to 24332.03 MD) to CD4-05 (15000 - CD4-25wp06 Plan 491.83 , -- - _ 55_ .5--- 24332 03 91.77 332 1 7486 93 5955183 1506643 3474 785 21142 MD) 14996.87 84.27 318.86 7487.15 5955666 1506548 4048.13 (15000 - 21142 MD) Closest Approach: Reference Well: CD4- 25wp06 Plan Offset Well: CD4 -26 • Coords. - Coords. - ASP ASP ^� 3 -0 ctr -ctr . -- _ Meas. Incl. TRUE Subsea N( +) /S( -) View VS Meas. Incl. TRUE Subsea N( +) /S( -) View VS Distance. - -- _ - - -- Depth Angle Azi. TVD E( +) /W(- (331) Comments Depth Angle Azi. TVD E( +) /W(- (331) Comments PUUL Min POOL Min Distance (1958.32 Distance (1958.32 ft) in POOL (16196 ft) in POOL (16196 - 24332.03 MD) to - 24332.03 MD) to CD4-26 (16339 - CD4-25wp06 Plan .n. 1958.3 ._- - -_ _` - -_ -_= 24332.03 91.77 332.1 7486.93 5955183 1506643 3474.785 24749 MD) 18608.61 91.16 341.45 754241 5954592 1504777 3825.49 (16339 - 24749 MD) Closest Approach: Reference Well: CD4- 25wp06 Plan Offset Well: CD4 -17 ;^err Coords. - Coords. - ASP ASP 3- Dctr -ctr - ____-,:_! Meas. Incl. TRUE Subsea N( +) /S( -) View VS Meas. Incl. TRUE Subsea N( +) /S( -) View VS Distance. - _ _ - - Depth Angle Azi. TVD E( +) /W(- (331) Comments Depth Angle Azi. TVD E( + ) /W(- (331) Comments POOL Min POOL Mln Distance (2192.42 Distance (2192.42 ft) in POOL (16196 ft) in POOL (16196 - 24332.03 MD) to - 24332.03 MD) to CD4-17 (12975 - CD4-25wp06 Plan 2192.4 -' =t- - 7 = r - -= 24332 03 91.77 332.1 7486.93 5955183 1506643 3474.785 17975 MD) 12951.31 83.61 323.58 7415.34 5956683 1508241 4088.64 (12975 - 17975 MD) • Closest Approach: Reference Well: CD4- 25wp06 Plan Offset Well: CD4 -321 Coords. - Coords. - ASP ASP 3-D trctr . Meas. Incl. TRUE Subsea N( +) /S( -) View VS Meas. Incl. TRUE Subsea N( +) /S( -) View VS Distance. -_..- 1 Depth Angle Azi. TVD E( +) /W(- (331) Comments Depth Angle Azi. TVD E( +) /W(- (331) Comments PUUL Min POOL Min Distance (5292.92 Distance (5292.92 ft) in POOL (16196 ft) in POOL (16196 - 24332.03 MD) to - 24332.03 MD) to CD4- 25wp06 Plan CD4-321 (7485 - (7485 - 7570 5292.9 - -- - --- 24332.03 91.77 332.1 7486.93 5955183 1506643 3474 785 7570 TVDss) 18935.67 52.63 256.27 7479.98 5953312 1501692 4155.46 TVDss) PoolSummaryl 11/6/2009 10:44 AM • ConocoPhillips(Alaska) Inc. Western North Slope CD4 Nanuq Pad Plan: CD4 -25 Plan: CD4 -25 Plan: CD4- 25wp06 Standard Proposal Report N A D 2 7] 1 0 November, 2009 r Fi Db NO T Print HALLIBURTON Sperry Drilling Services • MP Western North Slope CD4- 25wp06 HALLIBURTON 1.- CD4 Nanuq Pad ConocoPhillips Plan: CD4 -25 Sperry Drilling Plan: CD4 -25 CD4- 25wp06 D D I : 7.290 SURVEY PROGRAM Depth From Depth To Survey /Plan Tool 36.30 1000.00 CD4- 25wp06 (Plan: CD4 -25) CB- GYRO -SS 0 1000.00 24332.03 CD4- 25wp06 (Plan: CD4 -25) MWD +IFR- AK- CAZ -SC 2 5 � po6 I 4-1 /2" x 6 -3/4" , GO 10 -3/4" x 13-1/2" C CD4- 25wp05 T1 o -3000 - -- _ - - - -- - - t 0 OM CD4- 25wp05 T2 ` CD4- 25wp05 T3 '� Z -6000 -_ -- O CD4- 25wp05 T4 C -9000 - 7 -5/8" X 9 -7/8 S CD4- 25wp05 T5 \___ I I -15000 -12000 -9000 -6000 -3000 0 3000 West( -) /East( +) (3000 ft /in) CASING DETAILS TVD MD Name Size 0 I' 1 2400.00 3038.16 10 -3/4" x 13-1/2" 10 -3/4 0° 7614.07 16196.93 7 -5/8" X 9 -7/8" 7 -5/8 7542.24 24332.03 4 -1/2" x 6 -3/4" 4 -1/2 10 °, c 20 °, C 30 = ' 40° o C -30 C -20 d" N 2500 = 10 -3/4" x 13 -1/2" y K -3 Marker Basal K -3 Q 6:2. TO Basal K -2 K-2 Marker L 5000 0 > Albian 96 n) I K-1 1 Marker UJU I_. HRZ Base HRL LCU- Miluveach 7-5/8" X 9 -7/8' rn 4 -1/2" x 6 -3/4" 7500 _ "! _ - Alpine D, o -- _ — N CD4 - 25wp05 Ti Alpine A Sand B3 sand Alpine C I ' CD4 - 25505 Ti5CD4- 25wp05 T4 CD4-25wp05 T3 CD4- 25wp05 T2 -7500 -5000 -2500 U 2500 5000 Vertical Section at 331.00°(2500 ft /in) Easting (3500 ft/in) I „ i 11 III IIiii iIil 1 IIIII,I „ , il,,,III„ , I,,, II,,, 1I.1, i iiI, mI, i 1 II III Ili] 1,1,,,il,,,,I,, III 1 - - ConocoPhillips(Alaska) Inc. -WNS Date prepared: — Western North Slope 10:34, November 05 2009 - CD4 Nanuq Pad - CD4- 303ST1 wp06 CD4- 212wp04 — Ci4G, -16 — - CD4 -208 CD4 -301 B - - . - CD 1 D4- 7 4- 208P:. — @6-I, "1 4 14- 303wp06 - - CD4 -2. C - CD4 304' : j - z - o D4 -3 \ CD4 -301A I u t .. CD - 320PB1 - w o - CD4 318A r = %� � r CD4 -302 0 z _'�0 CD4 -3G'I CD4 -2 p05 V _ - " D 4 -321 / - ..,-0, . t A N p05 T CD4 -320 Al CD4 -2' .05 CD` -2104 -209 CD4 23,wp 1 215 Nanuq 5 CD4 -214 - - •, wp05 T5 - 1 ,,,, I I I I I I I I I I I I I I I I 1 1 1 1 I , I I I I ,,, I I I „, I , I I I I „ I I I I I I, I I I I, I „,, 1 1, I I I I I I I I 1 1 1 1 I I I I, I 1,,, 1 ,,,, I I, Easting (3500 ft/in) 110 • ConocoPhillips HALLIBURTON Standard Proposal Report Database: EDM v16 Prod Local Co- ordinate Reference: Well Plan: CD4 - 25 Company: ConocoPhillips(Alaska) Inc. TVD Reference: Plan: CD4 -25 (36.3 +19) @ 55.30ft (Doyon 19) Project: Western North Slope MD Reference: Plan: CD4 -25 (36.3 +19) @ 55.30ft (Doyon 19) Site: CD4 Nanuq Pad North Reference: True Well: Plan: CD4 - 25 Survey Calculation Method: Minimum Curvature Wellbore: Plan: CD4 - 25 Design: CD4 25wp06 Project Western North Slope Map System: US State Plane 1927 (Exact solution) System Datum: Mean Sea Level Geo Datum: NAD 1927 (NADCON CONUS) Using Well Reference Point Map Zone: Alaska Zone 04 Using geodetic scale factor Site CD4 Nanuq Pad Site Position: Northing: 5,957,908.57ft Latitude: 70° 17' 36.666 N From: Map Easting: 377,794.25ft Longitude: 150° 59' 22.031 W Position Uncertainty: 0.00 ft Slot Radius: Grid Convergence: - 0.93 ° Well - -� - -- Plan: CD4 - 25 -- -- -- - -- — - Well Position +N /-S 0.00 ft Northing: 5,957,414.20 ft , Latitude: 70° 17' 31.791 N +E/ - 0.00 ft Easting: 377,707.79 ft ` Longitude: 150° 59' 24.316 W Position Uncertainty 0.00 if Wellhead Elevation: ft Ground Level: 19.00ft Wellbore Plan: CD4 - 25 Magnetics Model Name Sample Date Declination Dip Angle Field Strength ( °) ( °) (nT) BGGM2007 11/5/2009 16.39 79.60 57,293 Design CD4- 25wp06 Audit Notes: Version: Phase: PLAN Tie On Depth: 36.30 Vertical Section: Depth From (TVD) +N /-S +E/ -W Direction (ft) (ft) (ft) ( °) 36.30 0.00 0.00 331.00 I 11/10/2009 10:41:48AM Page 2 COMPASS 2003.16 Build 69 • • ConocoPhillips HALL.IBURTON Standard Proposal Report Database: EDM v16 Prod Local Co- ordinate Reference: Well Plan: CD4 - 25 Company: ConocoPhillips(Alaska) Inc. ND Reference: Plan: CD4 -25 (36.3 +19) @ 55.30ft (Doyon 19) Project: Western North Slope MD Reference: Plan: CD4 -25 (36.3 +19) @ 55.30ft (Doyon 19) Site: CD4 Nanuq Pad North Reference: True Well: Plan: CD4 - 25 Survey Calculation Method: Minimum Curvature Wel'bore: Plan: CD4 - 25 Design: CD4 25wp06 I Plan Sections Measured Vertical TVD Dogleg Build Turn Depth inclination Azimuth Depth System +N/.S +El.W Rate Rate Rate Tool Face (ft) (1 ( °) (ft) ft (ft) (ft) ( °1100ft) ( °H 00ft) . ( °/t 00ft) r) 36.30 0.00 0.00 36.30 -19.00 0.00 0.00 0.00 0.00 0.00 0.00 350.00 0.00 0.00 350.00 294.70 0.00 0.00 0.00 0.00 0.00 0.00 1 800.00 9.00 206.00 798.15 742.85 -31.70 -15.46 2.00 2.00 0.00 206.00 2,600.00 63.00 206.00 2,201.08 2,145.78 - 947.83 - 462.29 3.00 3.00 0.00 0.00 12,289.45 63.00 206.00 6,600.00 6,544.70 - 8,707.45 - 4,246.91 0.00 0.00 0.00 0.00 12,969.17 63.11 225.08 6,910.30 6,855.00 - 9,197.24 - 4,596.85 2.50 0.02 2.81 94.00 , 13,482.33 73.37 225.08 7,100.30 7,045.00 - 9,533.31 - 4,933.87 2.00 2.00 0.00 0.00 16,196.93 90.00 321.00 7,614.07 7,558.77 - 9,352.77 - 7,281.59 3.52 0.61 3.53 91.70 16,979.88 89.84 336.66 7,615.14 7,559.84 - 8,684.94 - 7,685.58 2.00 -0.02 2.00 90.57 18,041.13 89.84 336.66 7,618.01 7,562.71 - 7,710.56 - 8,106.05 0.00 0.00 0.00 0.00 18,530.36 90.00 331.77 7,618.67 7,563.37 - 7,270.18 - 8,318.81 1.00 0.03 -1.00 -88.19 1 18,623.10 90.93 331.77 7,617.92 7,562.62 - 7,188.47 - 8,362.68 1.00 1.00 0.01 0.37 20,532.18 90.93 331.77 7,587.02 7,531.72 - 5,506.61 - 9,265.45 0.00 0.00 0.00 0.00 20,597.71 90.29 331.62 7,586.32 7,531.02 - 5,448.91 - 9,296.52 1.00 -0.97 -0.23 - 166.58 23,279.83 90.29 331.62 7,572.75 7,517.45 - 3,089.13 - 10,571.26 0.00 0.00 0.00 0.00 1 23,435.43 91.77 332.10 7,569.95 7,514.65 - 2,951.94 - 10,644.62 1.00 0.95 0.31 18.05 1 24,332.98 91.77 332.10 7,542.24 7,486.94 - 2,159.06 - 11,064.35 0.00 0.00 0.00 0.00 L 11/10/2009 10:41:48AM Page 3 COMPASS 2003.16 Build 69 1 ConocoPhillips HALLIBURTQN Standard Proposal Report Database: EDM v16 Prod Local Co- ordinate Reference: Well Plan: CD4 - 25 Company: ConocoPhillips(Alaska) Inc. TVD Reference: Plan: CD4 -25 (36.3 +19) © 55.30ft (Doyon 19) Project: Western North Slope MD Reference: Plan: CD4 -25 (36.3 +19) © 55.30ft (Doyon 19) Site CD4 Nanuq Pad North Reference: True Well: Plan: CD4 - 25 Survey Calculation Method: Minimum Curvature Welibore: Plan: CD4 - 25 Design: CD4 25wp06 Planned Survey Measured Vertical Map Map Depth Inclination Azimuth Depth TVDss +N /-S +E/ -W Northing Easting DLS Vert Section (ft) ( °) ( °) (ft) ft (ft) (ft) (ft) (ft) -19.00 36.30 0.00 0.00 36.30 -19.00 0.00 0.00 5,957,414.20 377,707.79 0.00 0.00 100.00 0.00 0.00 100.00 44.70 0.00 0.00 5,957,414.20 377,707.79 0.00 0.00 200.00 0.00 0.00 200.00 144.70 0.00 0.00 5,957,414.20 377,707.79 0.00 0.00 300.00 0.00 0.00 300.00 244.70 0.00 0.00 5,957,414.20 377,707.79 0.00 0.00 1 350.00 a 0.00 0.00 350.00 294.70 0.00 0.00 5,957,414.20 377,707.79 0.00 0.00 Start Build 2.00 400.00 1.00 206.00 400.00 344.70 -0.39 -0.19 5,957,413.81 377,707.60 2.00 -0.25 500.00 3.00 206.00 499.93 444.63 -3.53 -1.72 5,957,410.70 377,706.02 2.00 -2.25 600.00 5.00 206.00 599.68 544.38 -9.80 -4.78 5,957,404.48 377,702.86 2.00 -6.25 700.00 7.00 206.00 699.13 643.83 -19.19 -9.36 5,957,395.16 377,698.12 2.00 -12.25 800.00 9.00 206.00 798.15 742.85 -31.70 -15.46 5,957,382.76 377,691.82 2.00 -20.23 Start DLS 3.00 TFO 0.00 900.00 12.00 206.00 896.47 841.17 -48.08 -23.45 5,957,366.51 377,683.57 3.00 -30.68 1,000.00 15.00 206.00 993.69 938.39 -69.06 -33.68 5,957,345.71 377,673.00 3.00 -44.07 1,100.00 18.00 206.00 1,089.56 1,034.26 -94.58 -46.13 5,957,320.39 377,660.13 3.00 -60.36 1,200.00 21.00 206.00 1,183.82 1,128.52 - 124.58 -60.76 5,957,290.63 377,645.02 3.00 -79.50 1,300.00 24.00 206.00 1,276.19 1,220.89 - 158.97 -77.54 5,957,256.52 377,627.69 3.00 - 101.45 i 1,400.00 27.00 206.00 1,366.44 1,311.14 - 197.66 -96.41 5,957,218.15 377,608.19 3.00 - 126.14 1,500.00 30.00 206.00 1,454.31 1,399.01 - 240.54 - 117.32 5,957,175.62 377,586.59 3.00 - 153.51 1,600.00 33.00 206.00 1,539.57 1,484.27 - 287.50 - 140.22 5,957,129.04 377,562.92 3.00 - 183.47 1,700.00 36.00 206.00 1,621.97 1,566.67 - 338.40 - 165.05 5,957,078.55 377,537.28 3.00 - 215.96 1,800.00 39.00 206.00 1,701.30 1,646.00 - 393.11 - 191.73 5,957,024.29 377,509.71 3.00 - 250.87 1,900.00 42.00 206.00 1,777.33 1,722.03 - 451.48 - 220.20 5,956,966.40 377,480.30 3.00 - 288.12 2,000.00 45.00 206.00 1,849.86 1,794.56 - 513.34 - 250.37 5,956,905.04 377,449.13 3.00 - 327.59 2,100.00 48.00 206.00 1,918.69 1,863.39 - 578.53 - 282.17 5,956,840.39 377,416.28 3.00 - 369.19 2,200.00 51.00 206.00 1,983.62 1,928.32 - 646.86 - 315.50 5,956,772.61 377,381.84 3.00 - 412.80 2,300.00 54.00 206.00 2,044.49 1,989.19 - 718.16 - 350.27 5,956,701.89 377,345.92 3.00 - 458.30 2,400.00 57.00 206.00 2,101.13 2,045.83 - 792.23 - 386.39 5,956,628.43 377,308.60 3.00 - 505.57 2,500.00 60.00 206.00 2,153.37 2,098.07 - 868.85 - 423.77 5,956,552.43 377,269.98 3.00 - 554.47 2,600.00 63.00 206.00 2,201.08 2,145.78 - 947.83 - 462.29 5,956,474.09 377,230.19 3.00 - 604.87 Start 9689.45 hold at 2600.00 MD 2,700.00 63.00 206.00 2,246.48 2,191.18 - 1,027.91 - 501.35 5,956,394.66 377,189.83 0.00 - 655.98 2,800.00 63.00 206.00 2,291.88 2,236.58 - 1,108.00 - 540.41 5,956,315.23 377,149.48 0.00 - 707.08 2,900.00 63.00 206.00 2,337.28 2,281.98 - 1,188.08 - 579.47 5,956,235.80 377,109.13 0.00 - 758.19 I 3,000.00 63.00 206.00 2,382.68 2,327.38 - 1,268.16 - 618.52 5,956,156.37 377,068.77 0.00 - 809.29 3,038.16 63.00 206.00 2,400.00 2,344.70 - 1,298.72 - 633.43 5,956,126.06 377,053.38 0.00 - 828.79 10 - 3/4" x 13 3,049.83 63.00 206.00 2,405.30 2,350.00 - 1,308.07 - 637.99 5,956,116.79 377,048.67 0.00 - 834.76 C - 30 3,100.00 63.00 206.00 2,428.08 2,372.78 - 1,348.25 - 657.58 5,956,076.94 377,028.42 0.00 - 860.40 3,200.00 63.00 206.00 2,473.48 2,418.18 - 1,428.33 - 696.64 5,955,997.51 376,988.07 0.00 - 911.51 3,300.00 63.00 206.00 2,518.87 2,463.57 - 1,508.41 - 735.70 5,955,918.08 376,947.71 0.00 - 962.61 3,400.00 63.00 206.00 2,564.27 2,508.97 - 1,588.50 - 774.76 5,955,838.65 376,907.36 0.00 - 1,013.72 3,500.00 63.00 206.00 2,609.67 2,554.37 - 1,668.58 - 813.82 5,955,759.22 376,867.01 0.00 - 1,064.82 3,600.00 63.00 206.00 2,655.07 2,599.77 - 1,748.66 - 852.88 5,955,679.79 376,826.65 0.00 - 1,115.93 11/10/2009 10:41:48AM Page 4 COMPASS 2003.16 Build 69 0 0 ConocoPhillips HALLIBURTD J Standard Proposal Report Database: EDM v16 Prod Local Co-ordinate Reference: Well Plan: CD4 - 25 Company: ConocoPhillips(Alaska) Inc. 1VD Reference: Plan: CD4 -25 (36.3 +19) © 55.30ft (Doyon 19) Project: Western North Slope MD Reference: Plan: CD4 -25 (36.3 +19) © 55.30ft (Doyon 19) Site: CD4 Nanuq Pad North Reference: True Well: Plan: CD4 - 25 Survey Calculation Method: Minimum Curvature Welibore: Plan: CD4 - 25 Design: CD4 25wp06 Planned Survey Measured Vertical Map Map Depth Inclination Azimuth Depth TVDss +N /-S +E / -W Northing Easting DLS Vert Section (ft) ( ( (ft) ft (ft) (ft) (ft) (ft) 2,645.17 3,700.00 63.00 206.00 2,700.47 2,645.17 - 1,828.75 - 891.94 5,955,600.36 376,786.30 0.00 - 1,167.04 3,800.00 63.00 206.00 2,745.87 2,690.57 - 1,908.83 - 931.00 5,955,520.93 376,745.95 0.00 - 1,218.14 3,864.83 63.00 206.00 2,775.30 2,720.00 - 1,960.74 - 956.32 5,955,469.44 376,719.79 0.00 - 1,251.27 C - 20 3,900.00 63.00 206.00 2,791.27 2,735.97 - 1,988.91 - 970.06 5,955,441.50 376,705.59 0.00 - 1,269.25 4,000.00 63.00 206.00 2,836.67 2,781.37 - 2,068.99 - 1,009.12 5,955,362.07 376,665.24 0.00 - 1,320.35 4,100.00 63.00 206.00 2,882.07 2,826.77 - 2,149.08 - 1,048.18 5,955,282.64 376,624.89 0.00 - 1,371.46 i 4,200.00 63.00 206.00 2,927.47 2,872.17 - 2,229.16 - 1,087.23 5,955,203.20 376,584.53 0.00 - 1,422.57 4,300.00 63.00 206.00 2,972.86 2,917.56 - 2,309.24 - 1,126.29 5,955,123.77 376,544.18 0.00 - 1,473.67 4,400.00 63.00 206.00 3,018.26 2,962.96 - 2,389.33 - 1,165.35 5,955,044.34 376,503.83 0.00 - 1,524.78 4,500.00 63.00 206.00 3,063.66 3,008.36 - 2,469.41 - 1,204.41 5,954,964.91 376,463.47 0.00 - 1,575.88 4,600.00 63.00 206.00 3,109.06 3,053.76 - 2,549.49 - 1,243.47 5,954,885.48 376,423.12 0.00 - 1,626.99 4,700.00 63.00 206.00 3,154.46 3,099.16 - 2,629.58 - 1,282.53 5,954,806.05 376,382.77 0.00 - 1,678.10 4,800.00 63.00 206.00 3,199.86 3,144.56 - 2,709.66 - 1,321.59 5,954,726.62 376,342.41 0.00 - 1,729.20 4,900.00 63.00 206.00 3,245.26 3,189.96 - 2,789.74 - 1,360.65 5,954,647.19 376,302.06 0.00 - 1,780.31 5,000.00 63.00 206.00 3,290.66 3,235.36 - 2,869.83 - 1,399.71 5,954,567.76 376,261.71 0.00 - 1,831.41 5,100.00 63.00 206.00 3,336.06 3,280.76 - 2,949.91 - 1,438.77 5,954,488.33 376,221.35 0.00 - 1,882.52 5,200.00 63.00 206.00 3,381.46 3,326.16 - 3,029.99 - 1,477.83 5,954,408.90 376,181.00 0.00 - 1,933.63 5,300.00 63.00 206.00 3,426.86 3,371.56 - 3,110.08 - 1,516.89 5,954,329.47 376,140.65 0.00 - 1,984.73 5,400.00 63.00 206.00 3,472.25 3,416.95 - 3,190.16 - 1,555.94 5,954,250.04 376,100.29 0.00 - 2,035.84 5,500.00 63.00 206.00 3,517.65 3,462.35 - 3,270.24 - 1,595.00 5,954,170.61 376,059.94 0.00 - 2,086.94 5,600.00 63.00 206.00 3,563.05 3,507.75 - 3,350.32 - 1,634.06 5,954,091.18 376,019.59 0.00 - 2,138.05 5,700.00 63.00 206.00 3,608.45 3,553.15 - 3,430.41 - 1,673.12 5,954,011.75 375,979.23 0.00 - 2,189.16 5,800.00 63.00 206.00 3,653.85 3,598.55 - 3,510.49 - 1,712.18 5,953,932.32 375,938.88 0.00 - 2,240.26 5,900.00 63.00 206.00 3,699.25 3,643.95 - 3,590.57 - 1,751.24 5,953,852.89 375,898.53 0.00 - 2,291.37 6,000.00 63.00 206.00 3,744.65 3,689.35 - 3,670.66 - 1,790.30 5,953,773.46 375,858.17 0.00 - 2,342.47 6,100.00 63.00 206.00 3,790.05 3,734.75 - 3,750.74 - 1,829.36 5,953,694.02 375,817.82 0.00 - 2,393.58 6,200.00 63.00 206.00 3,835.45 3,780.15 - 3,830.82 - 1,868.42 5,953,614.59 375,777.46 0.00 - 2,444.69 6,232.72 63.00 206.00 3,850.30 3,795.00 - 3,857.02 - 1,881.20 5,953,588.61 375,764.26 0.00 - 2,461.41 K - 3 Marker 6,300.00 63.00 206.00 3,880.85 3,825.55 - 3,910.91 - 1,907.48 5,953,535.16 375,737.11 0.00 - 2,495.79 ' 6,400.00 63.00 206.00 3,926.24 3,870.94 - 3,990.99 - 1,946.54 5,953,455.73 375,696.76 0.00 - 2,546.90 6,500.00 63.00 206.00 3,971.64 3,916.34 - 4,071.07 - 1,985.59 5,953,376.30 375,656.40 0.00 - 2,598.01 6,600.00 63.00 206.00 4,017.04 3,961.74 - 4,151.16 - 2,024.65 5,953,296.87 375,616.05 0.00 - 2,649.11 6,700.00 63.00 206.00 4,062.44 4,007.14 - 4,231.24 - 2,063.71 5,953,217.44 375,575.70 0.00 - 2,700.22 6,723.92 63.00 206.00 4,073.30 4,018.00 - 4,250.39 - 2,073.05 5,953,198.44 375,566.05 0.00 - 2,712.44 Basal K - 3 6,800.00 63.00 206.00 4,107.84 4,052.54 - 4,311.32 - 2,102.77 5,953,138.01 375,535.34 0.00 - 2,751.32 6,807.62 63.00 206.00 4,111.30 4,056.00 - 4,317.42 - 2,105.75 5,953,131.96 375,532.27 0.00 - 2,755.22 K - 2 Marker 6,900.00 63.00 206.00 4,153.24 4,097.94 - 4,391.41 - 2,141.83 5,953,058.58 375,494.99 0.00 - 2,802.43 7,000.00 63.00 206.00 4,198.64 4,143.34 - 4,471.49 - 2,180.89 5,952,979.15 375,454.64 0.00 - 2,853.54 7,043.31 63.00 206.00 4,218.30 4,163.00 - 4,506.17 - 2,197.81 5,952,944.75 375,437.16 0.00 - 2,875.67 1 Basal K - 2 7,100.00 63.00 206.00 4,244.04 4,18814 - 4,551.57 - 2,219.95 5,952,899/2 375,414.28 0.00 - 2,904.64 I 11/10/2009 10:41:48AM Page 5 COMPASS 2003.16 Build 69 ConocoPhillips HALLIBURTDN Standard Proposal Report Database: EDM v16 Prod Local Co-ordinate Reference: Well Plan: CD4 - 25 Company: ConocoPhillips(Alaska) Inc. TVD Reference: Plan: CD4 -25 (36.3 +19) © 55.30ft (Doyon 19) Project: Western North Slope MD Reference: Plan: CD4 -25 (36.3 +19) @ 55.30ft (Doyon 19) Site: CD4 Nanuq Pad North Reference: True Well: Plan: CD4 - 25 Survey Calculation Method: Minimum Curvature Wel'bore: Plan: CD4 - 25 Design: CD4 25wp06 Planned Survey Measured Vertical Map Map Depth inclination Azimuth Depth TVDss +N/-S +E/-W Northing Easting DLS Vert Section (ft) ( °) C) (ft) ft (ft) (ft) (ft) (ft) 4,234.14 7,200.00 63.00 206.00 4,289.44 4,234.14 - 4,631.65 - 2,259.01 5,952,820.29 375,373.93 0.00 - 2,955.75 7,300.00 63.00 206.00 4,334.84 4,279.54 - 4,711.74 - 2,298.07 5,952,740.86 375,333.58 0.00 - 3,006.85 7,400.00 63.00 206.00 4,380.24 4,324.94 - 4,791.82 - 2,337.13 5,952,661.43 375,293.22 0.00 - 3,057.96 7,500.00 63.00 206.00 4,425.63 4,370.33 - 4,871.90 - 2,376.19 5,952,582.00 375,252.87 0.00 - 3,109.07 7,600.00 63.00 206.00 4,471.03 4,415.73 - 4,951.99 - 2,415.25 5,952,502.57 375,212.52 0.00 - 3,160.17 7,700.00 63.00 206.00 4,516.43 4,461.13 - 5,032.07 - 2,454.30 5,952,423.14 375,172.16 0.00 - 3,211.28 7,800.00 63.00 206.00 4,561.83 4,506.53 - 5,112.15 - 2,493.36 5,952,343.71 375,131.81 0.00 - 3,262.38 7,900.00 63.00 206.00 4,607.23 4,551.93 - 5,192.24 - 2,532.42 5,952,264.27 375,091.46 0.00 - 3,313.49 8,000.00 63.00 206.00 4,652.63 4,597.33 - 5,272.32 - 2,571.48 5,952,184.84 375,051.10 0.00 - 3,364.60 8,100.00 63.00 206.00 4,698.03 4,642.73 - 5,352.40 - 2,610.54 5,952,105.41 375,010.75 0.00 - 3,415.70 8,200.00 63.00 206.00 4,743.43 4,688.13 - 5,432.49 - 2,649.60 5,952,025.98 374,970.40 0.00 - 3,466.81 8,300.00 63.00 206.00 4,788.83 4,733.53 - 5,512.57 - 2,688.66 5,951,946.55 374,930.04 0.00 - 3,517.91 8,400.00 63.00 206.00 4,834.23 4,778.93 - 5,592.65 - 2,727.72 5,951,867.12 374,889.69 0.00 - 3,569.02 8,500.00 63.00 206.00 4,879.62 4,824.32 - 5,672.74 - 2,766.78 5,951,787.69 374,849.34 0.00 - 3,620.13 8,600.00 63.00 206.00 4,925.02 4,869.72 - 5,752.82 - 2,805.84 5,951,708.26 374,808.98 0.00 - 3,671.23 8,700.00 63.00 206.00 4,970.42 4,915.12 - 5,832.90 - 2,844.90 5,951,628.83 374,768.63 0.00 - 3,722.34 8,800.00 63.00 206.00 5,015.82 4,960.52 - 5,912.98 - 2,883.96 5,951,549.40 374,728.28 0.00 - 3,773.44 8,900.00 63.00 206.00 5,061.22 5,005.92 - 5,993.07 - 2,923.01 5,951,469.97 374,687.92 0.00 - 3,824.55 9,000.00 63.00 206.00 5,106.62 5,051.32 - 6,073.15 - 2,962.07 5,951,390.54 374,647.57 0.00 - 3,875.66 j 9,100.00 63.00 206.00 5,152.02 5,096.72 - 6,153.23 - 3,001.13 5,951,311.11 374,607.22 0.00 - 3,926.76 9,200.00 63.00 206.00 5,197.42 5,142.12 - 6,233.32 - 3,040.19 5,951,231.68 374,566.86 0.00 - 3,977.87 9,300.00 63.00 206.00 5,242.82 5,187.52 - 6,313.40 - 3,079.25 5,951,152.25 374,526.51 0.00 - 4,028.97 9,400.00 63.00 206.00 5,288.22 5,232.92 - 6,393.48 - 3,118.31 5,951,072.82 374,486.16 0.00 - 4,080.08 9,500.00 63.00 206.00 5,333.62 5,278.32 - 6,473.57 - 3,157.37 5,950,993.39 374,445.80 0.00 - 4,131.19 9,600.00 63.00 206.00 5,379.01 5,323.71 - 6,553.65 - 3,196.43 5,950,913.96 374,405.45 0.00 - 4,182.29 9,700.00 63.00 206.00 5,424.41 5,369.11 - 6,633.73 - 3,235.49 5,950,834.53 374,365.10 0.00 - 4,233.40 9,800.00 63.00 206.00 5,469.81 5,414.51 - 6,713.82 - 3,274.55 5,950,755.09 374,324.74 0.00 - 4,284.50 9,900.00 63.00 206.00 5,515.21 5,459.91 - 6,793.90 - 3,313.61 5,950,675.66 374,284.39 0.00 - 4,335.61 10,000.00 63.00 206.00 5,560.61 5,505.31 - 6,873.98 - 3,352.67 5,950,596.23 374,244.04 0.00 - 4,386.72 10,100.00 63.00 206.00 5,606.01 5,550.71 - 6,954.07 - 3,391.72 5,950,516.80 374,203.68 0.00 - 4,437.82 10,200.00 63.00 206.00 5,651.41 5,596.11 - 7,034.15 - 3,430.78 5,950,437.37 374,163.33 0.00 - 4,488.93 10,300.00 63.00 206.00 5,696.81 5,641.51 - 7,114.23 - 3,469.84 5,950,357.94 374,122.97 0.00 - 4,540.03 10,400.00 63.00 206.00 5,742.21 5,686.91 - 7,194.32 - 3,508.90 5,950,278.51 374,082.62 0.00 - 4,591.14 10,500.00 63.00 206.00 5,787.61 5,732.31 - 7,274.40 - 3,547.96 5,950,199.08 374,042.27 0.00 - 4,642.25 10,600.00 63.00 206.00 5,833.01 5,777.71 - 7,354.48 - 3,587.02 5,950,119.65 374,001.91 0.00 - 4,693.35 1 10,700.00 63.00 206.00 5,878.40 5,823.10 - 7,434.56 - 3,626.08 5,950,040.22 373,961.56 0.00 - 4,744.46 10,800.00 63.00 206.00 5,923.80 5,868.50 - 7,514.65 - 3,665.14 5,949,960.79 373,921.21 0.00 - 4,795.56 I 10,900.00 63.00 206.00 5,969.20 5,913.90 - 7,594.73 - 3,704.20 5,949,881.36 373,880.85 0.00 - 4,846.67 11,000.00 63.00 206.00 6,014.60 5,959.30 - 7,674.81 - 3,743.26 5,949,801.93 373,840.50 0.00 - 4,897.78 11,100.00 63.00 206.00 6,060.00 6,004.70 - 7,754.90 - 3,782.32 5,949,722.50 373,800.15 0.00 - 4,948.88 11,200.00 63.00 206.00 6,105.40 6,050.10 - 7,834.98 - 3,821.38 5,949,643.07 373,759.79 0.00 - 4,999.99 11,300.00 63.00 206.00 6,150.80 6,095.50 - 7,915.06 - 3,860.43 5,949,563.64 373,719.44 0.00 - 5,051.09 11,400.00 63.00 206.00 6,196.20 6,140.90 - 7,995.15 - 3,899.49 5,949,484.21 373,679.09 0.00 - 5,102.20 11,464.10 63.00 206.00 6,225.30 6,170.00 - 8,046.48 - 3,924.53 5,949,433.29 373,653.22 0.00 - 5,134.96 Albian 96 11/10/2009 10:41:48AM Page 6 COMPASS 2003.16 Build 69 • • ConocoPhillips HALLIBURTON Standard Proposal Report Database: EDM v16 Prod Local Co- ordinate Reference: Well Plan: CD4 - 25 Company: ConocoPhillips(Alaska) Inc. 1VD Reference: Plan: CD4 -25 (36.3 +19) © 55.30ft (Doyon 19) Project: Western North Slope MD Reference: Plan: CD4 -25 (36.3 +19) © 55.30ft (Doyon 19) Site: CD4 Nanuq Pad North Reference: True Well: Plan: CD4 - 25 Survey Calculation Method: Minimum Curvature Welibore: Plan: CD4 - 25 Design: CD4 25wp06 Planned Survey I Measured Vertical Map Map 1 Depth Inclination Azimuth Depth TVDss +N)-S +E/ -W Northing fasting DLS Vert Section j (ft) ( ( (ft) ft (ft) (ft) (ft) (ft) 6,186.30 11,500.00 63.00 206.00 6,241.60 6,186.30 - 8,075.23 - 3,938.55 5,949,404.78 373,638.73 0.00 - 5,153.31 11,600.00 63.00 206.00 6,287.00 6,231.70 - 8,155.31 - 3,977.61 5,949,325.35 373,598.38 0.00 - 5,204.41 11,700.00 63.00 206.00 6,332.39 6,277.09 - 8,235.40 - 4,016.67 5,949,245.91 373,558.03 0.00 - 5,255.52 11,800.00 63.00 206.00 6,377.79 6,322.49 - 8,315.48 - 4,055.73 5,949,166.48 373,517.67 0.00 - 5,306.62 11,900.00 63.00 206.00 6,423.19 6,367.89 - 8,395.56 - 4,094.79 5,949,087.05 373,477.32 0.00 - 5,357.73 12,000.00 63.00 206.00 6,468.59 6,413.29 - 8,475.65 - 4,133.85 5,949,007.62 373,436.97 0.00 - 5,408.84 12,100.00 63.00 206.00 6,513.99 6,458.69 - 8,555.73 - 4,172.91 5,948,928.19 373,396.61 0.00 - 5,459.94 12,200.00 63.00 206.00 6,559.39 6,504.09 - 8,635.81 - 4,211.97 5,948,848.76 373,356.26 0.00 - 5,511.05 12,289.45 63.00 206.00 6,600.00 6,544.70 - 8,707.45 - 4,246.91 5,948,777.71 373,320.16 0.00 - 5,556.76 Start DLS 2.50 TFO 94.00 12,300.00 62.98 206.30 6,604.79 6,549.49 - 8,715.88 - 4,251.05 5,948,769.34 373,315.89 2.50 - 5,562.13 ' 12,400.00 62.84 209.10 6,650.33 6,595.03 - 8,794.70 - 4,292.42 5,948,691.21 373,273.24 2.50 - 5,611.01 ' 12,500.00 62.76 211.91 6,696.05 6,640.75 - 8,871.32 - 4,337.56 5,948,615.34 373,226.86 2.50 - 5,656.14 12,600.00 62.73 214.72 6,741.86 6,686.56 - 8,945.60 - 4,386.38 5,948,541.88 373,176.85 2.50 - 5,697.44 12,700.00 62.75 217.53 6,787.67 6,732.37 - 9,017.39 - 4,438.78 5,948,470.95 373,123.29 2.50 - 5,734.82 12,800.00 62.84 220.34 6,833.39 6,778.09 - 9,086.56 - 4,494.67 5,948,402.71 373,066.29 2.50 - 5,768.23 12,900.00 62.98 223.15 6,878.94 6,823.64 - 9,152.98 - 4,553.93 5,948,337.27 373,005.95 2.50 - 5,797.58 12,969.17 63.11 225.08 6,910.30 6,855.00 - 9,197.24 - 4,596.85 5,948,293.72 372,962.33 2.50 - 5,815.49 Start Build 2.00 13,000.00 63.72 225.08 6,924.10 6,868.80 - 9,216.71 - 4,616.37 5,948,274.57 372,942.49 2.00 - 5,823.05 1 13,014.08 64.00 225.08 6,930.30 6,875.00 - 9,225.63 - 4,625.32 5,948,265.79 372,933.40 2.00 - 5,826.52 HRZ 13,100.00 65.72 225.08 6,966.80 6,911.50 - 9,280.55 - 4,680.40 5,948,211.78 372,877.44 2.00 - 5,847.85 13,200.00 67.72 225.08 7,006.31 6,951.01 - 9,345.41 - 4,745.44 5,948,147.99 372,811.36 2.00 - 5,873.05 13,300.00 69.72 225.08 7,042.60 6,987.30 - 9,411.21 - 4,811.42 5,948,083.28 372,744.32 2.00 - 5,898.60 13,400.00 71.72 225.08 7,075.61 7,020.31 - 9,477.86 - 4,878.26 5,948,017.74 372,676.42 2.00 - 5,924.49 13,415.08 72.02 225.08 7,080.30 7,025.00 - 9,487.98 - 4,888.41 5,948,007.78 372,666.10 2.00 - 5,928.43 I Base HRZ 1 13,482.33 73.37 225.08 7,100.30 7,045.00 - 9,533.31 - 4,933.87 5,947,963.20 372,619.92 2.00 - 5,946.04 Start DLS 3.52 TFO 91.70 13,500.00 73.35 225.73 7,105.36 7,050.06 - 9,545.20 - 4,945.92 5,947,951.51 372,607.67 3.52 - 5,950.59 13,600.00 73.29 229.41 7,134.07 7,078.77 - 9,609.82 - 5,016.61 5,947,888.05 372,535.94 3.52 - 5,972.83 1 13,621.67 73.29 230.21 7,140.30 7,085.00 - 9,623.21 - 5,032.47 5,947,874.92 372,519.87 3.52 - 5,976.86 K - 1 Marker 13,700.00 i 73.30 233.09 7,162.82 7,107.52 - 9,669.76 - 5,091.30 5,947,829.34 372,460.30 3.52 - 5,989.05 13,800.00 73.37 236.77 7,191.52 7,136.22 - 9,724.79 - 5,169.68 5,947,775.59 372,381.04 3.52 - 5,999.18 13,900.00 73.50 240.44 7,220.04 7,164.74 - 9,774.71 - 5,251.48 5,947,727.01 372,298.44 3.52 - 6,003.19 13,936.18 73.56 241.77 7,230.30 7,175.00 - 9,791.48 - 5,281.86 5,947,710.75 372,267.80 3.52 - 6,003.12 LCU Miluveach 14,000.00 73.70 244.11 7,248.29 7,192.99 - 9,819.33 - 5,336.38 5,947,683.79 372,212.83 3.52 - 6,001.05 14,100.00 73.96 247.77 7,276.15 7,220.85 - 9,858.48 - 5,424.06 5,947,646.07 372,124.53 3.52 - 5,992.78 14,200.00 74.28 251.42 7,303.52 7,248.22 - 9,892.01 - 5,514.20 5,947,614.02 372,033.88 3.52 - 5,978.41 14,300.00 74.67 255.05 7,330.29 7,274.99 - 9,919.79 - 5,606.43 5,947,587.74 371,941.21 3.52 - 5,957.99 14,400.00 75.11 258.68 7,356.38 7,301.08 - 9,941.73 - 5,700.43 5,947,567.34 371,846.87 3.52 - 5,931.60 L 14,500.00 75.61 262.28 7,381.66 7,326.36 - 9,957.72 - 5,795.83 5,947,552.90 371,751.23 3.52 - 5,899.35 11/10/2009 10:41:48AM Page 7 COMPASS 2003.16 Build 69 • ConocoPhillips HALLIBURTON Standard Proposal Report Database: EDM v16 Prod Local Co-ordinate Reference: Well Plan: CD4 - 25 Company: ConocoPhillips(Alaska) Inc. TVD Reference: Plan: CD4 -25 (36.3 +19) © 55.30ft (Doyon 19) Project: Western North Slope MD Reference: Plan: CD4 -25 (36.3 +19) @ 55.30ft (Doyon 19) Site: CD4 Nanuq Pad North Reference: True Well: Plan: CD4 - 25 Survey Calculation Method: Minimum Curvature Welibone: Plan: CD4 - 25 Design: CD4 25wp06 I Planned Survey Measured Vertical Map Map Depth Inclination Azimuth Depth TVDss +N /-S +E/ -W Northing Easting DLS Vert Section (ft) ( °) ( °) (ft) ft (ft) (ft) (ft) (ft) 7,350.76 14,600.00 76.16 265.87 7,406.06 7,350.76 - 9,967.73 - 5,892.28 5,947,544.47 371,654.64 3.52 - 5,861.34 14,700.00 76.76 269.44 7,429.48 7,374.18 - 9,971.70 - 5,989.40 5,947,542.07 371,557.48 3.52 - 5,817.73 14,725.59 76.93 270.35 7,435.30 7,380.00 - 9,971.74 - 6,014.32 5,947,542.44 371,532.57 3.52 - 5,805.68 I Alpine C 14,770.29 77.22 271.94 7,445.30 7,390.00 - 9,970.87 - 6,057.87 5,947,544.02 371,489.03 3.52 - 5,783.81 UJU 14,800.00 77.42 272.99 7,451.82 7,396.52 - 9,969.62 - 6,086.83 5,947,545.73 371,460.10 3.52 - 5,768.67 14,900.00 78.12 276.53 7,473.01 7,417.71 - 9,961.51 - 6,184.21 5,947,555.43 371,362.88 3.52 - 5,714.37 14,901.39 78.13 276.58 7,473.30 7,418.00 - 9,961.35 - 6,185.56 5,947,555.61 371,361.53 3.52 - 5,713.57 Alpine D 15,000.00 78.86 280.04 7,492.97 7,437.67 - 9,947.38 - 6,281.16 5,947,571.13 371,266.18 3.52 - 5,655.01 15,100.00 79.65 283.54 7,511.61 7,456.31 - 9,927.31 - 6,377.31 5,947,592.77 371,170.37 3.52 - 5,590.83 15,200.00 80.47 287.02 7,528.88 7,473.58 - 9,901.35 - 6,472.31 5,947,620.27 371,075.81 3.52 - 5,522.07 15,300.00 81.33 290.48 7,544.70 7,489.40 - 9,869.61 - 6,565.80 5,947,653.52 370,982.87 3.52 - 5,448.99 I 15,400.00 82.22 293.93 7,559.01 7,503.71 - 9,832.21 - 6,657.41 5,947,692.40 370,891.88 3.52 - 5,371.86 15,500.00 83.13 297.36 7,571.76 7,516.46 - 9,789.28 - 6,746.81 5,947,736.77 370,803.20 3.52 - 5,290.98 15,600.00 84.07 300.78 7,582.90 7,527.60 - 9,741.01 - 6,833.65 5,947,786.45 370,717.16 3.52 - 5,206.66 15,654.66 84.60 302.64 7,588.30 7,533.00 - 9,712.42 - 6,879.93 5,947,815.79 370,671.36 3.52 - 5,159.22 83 sand 15,700.00 85.03 304.18 7,592.40 7,537.10 - 9,687.55 - 6,917.62 5,947,841.26 370,634.09 3.52 - 5,119.20 15,734.72 85.37 305.36 7,595.30 7,540.00 - 9,667.82 - 6,946.04 5,947,861.45 370,605.99 3.52 - 5,088.16 Alpine A Sand 15,800.00 86.01 307.58 7,600.20 7,544.90 - 9,629.13 - 6,998.38 5,947,900.98 370,554.29 3.52 - 5,028.95 15,900.00 87.01 310.97 7,606.29 7,550.99 - 9,565.95 - 7,075.63 5,947,965.40 370,478.08 3.52 - 4,936.24 ' 16,000.00 88.01 314.35 7,610.64 7,555.34 - 9,498.26 - 7,149.09 5,948,034.27 370,405.74 3.52 - 4,841.42 16,100.00 89.02 317.73 7,613.24 7,557.94 - 9,426.32 - 7,218.47 5,948,107.33 370,337.54 3.52 - 4,744.86 16,196.93 90.00 321.00 7,614.07 7,558.77 - 9,352.77 - 7,281.59 5,948,181.89 370,275.64 3.52 - 4,649.94 Start DLS 2.00 TFO 90.57 - 7 X 9 - 7/8" 1 16,200.00 90.00 321.06 7,614.07 7,558.77 - 9,350.39 - 7,283.52 5,948,184.30 370,273.75 2.00 - 4,646.91 1 16,300.00 89.98 323.06 7,614.09 7,558.79 - 9,271.52 - 7,345.00 5,948,264.15 370,213.56 2.00 - 4,548.13 16,400.00 89.96 325.06 7,614.14 7,558.84 - 9,190.56 - 7,403.68 5,948,346.05 370,156.21 2.00 - 4,448.87 16,500.00 89.94 327.06 7,614.23 7,558.93 - 9,107.60 - 7,459.51 5,948,429.90 370,101.74 2.00 - 4,349.25 16,600.00 89.92 329.06 7,614.35 7,559.05 - 9,022.75 - 7,512.41 5,948,515.60 370,050.23 2.00 - 4,249.38 16,700.00 89.90 331.06 7,614.51 7,559.21 - 8,936.10 - 7,562.32 5,948,603.04 370,001.75 2.00 - 4,149.40 16,800.00 89.88 333.06 7,614.70 7,559.40 - 8,847.76 - 7,609.17 5,948,692.12 369,956.34 2.00 - 4,049.42 16,900.00 89.86 335.06 7,614.93 7,559.63 - 8,757.83 - 7,652.91 5,948,782.74 369,914.08 2.00 - 3,949.57 16,979.88 89.84 336.66 7,615.14 7,559.84 - 8,684.94 - 7,685.58 5,948,856.15 369,882.60 2.00 - 3,869.98 16,980.62 89.84 336.66 7,615.14 7,559.84 - 8,684.26 - 7,685.87 5,948,856.83 369,882.32 0.00 - 3,869.24 Start 1058.11 hold at 16980.62 MD 17,000.00 89.84 336.66 7,615.19 7,559.89 - 8,666.47 - 7,693.55 5,948,874.74 369,874.93 0.00 - 3,849.96 17,100.00 89.84 336.66 7,615.46 7,560.16 - 8,574.65 - 7,733.17 5,948,967.18 369,836.81 0.00 - 3,750.45 17,200.00 89.84 336.66 7,615.73 7,560.43 - 8,482.84 - 7,772.79 5,949,059.62 369,798.69 0.00 - 3,650.94 17,300.00 89.84 336.66 7,616.00 7,560.70 - 8,391.02 - 7,812.41 5,949,152.06 369,760.57 0.00 - 3,551.42 I 17,400.00 89.84 336.66 7,616.27 7,560.97 - 8,299.21 - 7,852.03 5,949,244.50 369,722.45 0.00 - 3,451.91 L 17,500.00 89.84 336.66 7,616.54 7,561.24 - 8,207.39 - 7,891.65 5,949,336.94 369,684.33 0.00 - 3,352.40 11/10/2009 10:41:48AM Page 8 COMPASS 2003.16 Build 69 • • ConocoPhillips HALLIBURTON Standard Proposal Report Database: EDM v16 Prod Local Co- ordinate Reference: Well Plan: CD4 Company: ConocoPhillips(Alaska) Inc. TVD Reference: Plan: CD4 -25 (36.3 +19) © 55.30ft (Doyon 19) Project: Western North Slope MD Reference: Plan: CD4 -25 (36.3 +19) © 55.30ft (Doyon 19) Site: CD4 Nanuq Pad North Reference: True Weil: Plan: CD4 - 25 Survey Calculation Method: Minimum Curvature Welibore: Plan: CD4 - 25 Design: CD4 25wp06 Planned Survey Measured Vertical Map Map Depth Inclination Azimuth Depth TVDss +NI-S +E/ -W Northing Easting DLS Vert Section (ft) ( °) ( °) (ft) ft (ft) (ft) (ft) (ft) 7,561.51 17,600.00 89.84 336.66 7,616.81 7,561.51 - 8,115.58 - 7,931.27 5,949,429.38 369,646.22 0.00 - 3,252.89 17,700.00 89.84 336.66 7,617.08 7,561.78 - 8,023.76 - 7,970.90 5,949,521.82 369,608.10 0.00 - 3,153.37 17,800.00 89.84 336.66 7,617.36 7,562.06 - 7,931.95 - 8,010.52 5,949,614.26 369,569.98 0.00 - 3,053.86 17,900.00 89.84 336.66 7,617.63 7,562.33 - 7,840.13 - 8,050.14 5,949,706.71 369,531.86 0.00 - 2,954.35 1 18,000.00 89.84 336.66 7,617.90 7,562.60 - 7,748.32 - 8,089.76 5,949,799.15 369,493.74 0.00 - 2,854.84 18,038.73 89.84 336.66 7,618.00 7,562.70 - 7,712.75 - 8,105.11 5,949,834.95 369,478.97 0.00 - 2,816.29 I Start DLS 1.00 TFO - 88.19 j 18,041.13 89.84 336.66 7,618.01 7,562.71 - 7,710.56 - 8,106.05 5,949,837.16 369,478.06 0.00 - 2,813.91 1 18,100.00 89.86 336.07 7,618.16 7,562.86 - 7,656.62 - 8,129.66 5,949,891.47 369,455.34 1.00 - 2,755.29 18,200.00 89.90 335.07 7,618.37 7,563.07 - 7,565.57 - 8,171.02 5,949,983.17 369,415.47 1.00 - 2,655.61 1 18,300.00 89.93 334.07 7,618.52 7,563.22 - 7,475.26 - 8,213.95 5,950,074.16 369,374.01 1.00 - 2,555.81 j 18,400.00 89.96 333.07 7,618.62 7,563.32 - 7,385.72 - 8,258.46 5,950,164.41 369,330.97 1.00 - 2,455.91 18,500.00 89.99 332.07 7,618.67 7,563.37 - 7,296.96 - 8,304.53 5,950,253.90 369,286.36 1.00 - 2,355.95 ■ I 18,529.44 90.00 331.78 7,618.67 7,563.37 - 7,270.98 - 8,318.38 5,950,280.10 369,272.93 1.00 - 2,326.51 Start DLS 1.00 TFO 0.00 ■ , 18,530.36 90.00 331.77 7,618.67 7,563.37 - 7,270.18 - 8,318.81 5,950,280.91 369,272.51 1.00 - 2,325.60 CD4 25wp05 T4 18,600.00 90.70 331.77 7,618.25 7,562.95 - 7,208.82 - 8,351.76 5,950,342.79 369,240.57 1.00 - 2,255.96 18,622.18 90.92 331.77 7,617.93 7,562.63 - 7,189.27 - 8,362.25 5,950,362.50 369,230.40 1.00 - 2,233.78 Start 1909.07 hold at 18622.18 MD 18,623.10 90.93 331.77 7,617.92 7,562.62 - 7,188.47 - 8,362.68 5,950,363.31 369,229.99 1.00 - 2,232.87 1 18,700.00 90.93 331.77 7,616.67 7,561.37 - 7,120.72 - 8,399.04 5,950,431.64 369,194.73 0.00 - 2,155.98 18,800.00 90.93 331.77 7,615.06 7,559.76 - 7,032.62 - 8,446.33 5,950,520.48 369,148.88 0.00 - 2,056.01 18,900.00 90.93 331.77 7,613.44 7,558.14 - 6,944.52 - 8,493.62 5,950,609.33 369,103.04 0.00 - 1,956.03 19,000.00 90.93 331.77 7,611.82 7,556.52 - 6,856.43 - 8,540.91 5,950,698.18 369,057.19 0.00 - 1,856.05 19,100.00 90.93 331.77 7,610.20 7,554.90 - 6,768.33 - 8,588.20 5,950,787.03 369,011.35 0.00 - 1,756.07 1 19,200.00 90.93 331.77 7,608.58 7,553.28 - 6,680.23 - 8,635.49 5,950,875.88 368,965.50 0.00 - 1,656.10 19,300.00 90.93 331.77 7,606.96 7,551.66 - 6,592.13 - 8,682.77 5,950,964.72 368,919.66 0.00 - 1,556.12 ' 19,400.00 90.93 331.77 7,605.34 7,550.04 - 6,504.04 - 8,730.06 5,951,053.57 368,873.81 0.00 - 1,456.14 19,500.00 90.93 331.77 7,603.73 7,548.43 - 6,415.94 - 8,777.35 5,951,142.42 368,827.97 0.00 - 1,356.16 19,600.00 90.93 331.77 7,602.11 7,546.81 - 6,327.84 - 8,824.64 5,951,231.27 368,782.12 0.00 - 1,256.18 19,700.00 90.93 331.77 7,600.49 7,545.19 - 6,239.74 - 8,871.93 5,951,320.12 368,736.28 0.00 - 1,156.21 19,800.00 90.93 331.77 7,598.87 7,543.57 - 6,151.64 - 8,919.21 5,951,408.96 368,690.43 0.00 - 1,056.23 19,900.00 90.93 331.77 7,597.25 7,541.95 - 6,063.55 - 8,966.50 5,951,497.81 368,644.59 0.00 - 956.25 20,000.00 90.93 331.77 7,595.63 7,540.33 - 5,975.45 - 9,013.79 5,951,586.66 368,598.75 0.00 - 856.27 20,100.00 90.93 331.77 7,594.02 7,538.72 - 5,887.35 - 9,061.08 5,951,675.51 368,552.90 0.00 - 756.30 20,200.00 90.93 331.77 7,592.40 7,537.10 -5,799.25 -9,108.37 5,951,764.36 368,507.06 0.00 -656.32 20,300.00 90.93 331.77 7,590.78 7,535.48 -5,711.16 -9,155.65 5,951,853.20 368,461.21 0.00 - 556.34 20,400.00 90.93 331.77 7,589.16 7,533.86 - 5,623.06 - 9,202.94 5,951,942.05 368,415.37 0.00 - 456.36 20,500.00 90.93 331.77 7,587.54 7,532.24 - 5,534.96 - 9,250.23 5,952,030.90 368,369.52 0.00 - 356.38 1 20,531.26 90.93 331.77 7,587.03 7,531.73 - 5,507.42 - 9,265.01 5,952,058.67 368,355.19 0.00 - 325.13 i Start DLS 1.00 TFO - 166.59 20,532.18 90.93 331.77 7,587.02 7,531.72 - 5,506.61 - 9,265.45 5,952,059.49 368,354.77 0.00 - 324.21 L CD4 25wpO5 T3 11/10/2009 10:41:48AM Page 9 COMPASS 2003.16 Build 69 • 0 ConocoPhillips 1- IALLIBURTON Standard Proposal Report Database: EDM v16 Prod Local Co- ordinate Reference: Well Plan: CD4 Company: ConocoPhillips(Alaska) Inc. 1VD Reference: Plan: CD4 -25 (36.3 +19) @ 55.30ft (Doyon 19) Project: Western North Slope MD Reference: Plan: CD4 -25 (36.3 +19) @ 55.30ft (Doyon 19) Site: CD4 Nanuq Pad North Reference: True Well: Plan: CD4 - 25 Survey Calculation Method: Minimum Curvature Wellbore: Plan: CD4 - 25 Design: CD4 25wp06 Planned Survey Measured Vertical Map Map Depth Inclination Azimuth Depth TVDss +N!-S +E7 -W Northing Easting DLS Vert Section (ft) (') (0) (ft) ft (ft) (ft) (ft) (ft) 7,531.03 20,596.79 90.30 331.62 7,586.33 7,531.03 - 5,449.73 - 9,296.08 5,952,116.86 368,325.07 1.00 - 259.61 Start 2682.10 hold at 20596.79 MD 20,597.71 90.29 331.62 7,586.32 7,531.02 - 5,448.91 - 9,296.52 5,952,117.68 368,324.64 1.00 - 258.69 20,600.00 90.29 331.62 7,586.31 7,531.01 - 5,446.90 - 9,297.60 5,952,119.71 368,323.59 0.00 - 256.40 20,700.00 90.29 331.62 7,585.81 7,530.51 - 5,358.92 - 9,345.13 5,952,208.45 368,277.50 0.00 - 156.41 20,800.00 90.29 331.62 7,585.30 7,530.00 - 5,270.94 - 9,392.66 5,952,297.18 368,231.42 0.00 -56.41 20,900.00 90.29 331.62 7,584.79 7,529.49 - 5,182.96 - 9,440.19 5,952,385.92 368,185.33 0.00 43.58 21,000.00 90.29 331.62 7,584.29 7,528.99 - 5,094.97 - 9,487.71 5,952,474.66 368,139.25 0.00 143.57 21,100.00 90.29 331.62 7,583.78 7,528.48 - 5,006.99 - 9,535.24 5,952,563.39 368,093.16 0.00 243.56 21,200.00 90.29 331.62 7,583.28 7,527.98 - 4,919.01 - 9,582.77 5,952,652.13 368,047.07 0.00 343.56 21,300.00 90.29 331.62 7,582.77 7,527.47 - 4,831.03 - 9,630.30 5,952,740.87 368,000.99 0.00 443.55 21,400.00 90.29 331.62 7,582.26 7,526.96 - 4,743.04 - 9,677.82 5,952,829.60 367,954.90 0.00 543.54 21,500.00 90.29 331.62 7,581.76 7,526.46 - 4,655.06 - 9,725.35 5,952,918.34 367,908.82 0.00 643.53 21,600.00 90.29 331.62 7,581.25 7,525.95 - 4,567.08 - 9,772.88 5,953,007.07 367,862.73 0.00 743.53 21,700.00 90.29 331.62 7,580.75 7,525.45 - 4,479.10 - 9,820.41 5,953,095.81 367,816.64 0.00 843.52 21,800.00 90.29 331.62 7,580.24 7,524.94 - 4,391.11 - 9,867.93 5,953,184.55 367,770.56 0.00 943.51 21,900.00 90.29 331.62 7,579.73 7,524.43 - 4,303.13 - 9,915.46 5,953,273.28 367,724.47 0.00 1,043.51 22,000.00 90.29 331.62 7,579.23 7,523.93 - 4,215.15 - 9,962.99 5,953,362.02 367,678.39 0.00 1,143.50 22,100.00 90.29 331.62 7,578.72 7,523.42 - 4,127.17 - 10,010.52 5,953,450.76 367,632.30 0.00 1,243.49 22,200.00 90.29 331.62 7,578.21 7,522.91 - 4,039.19 - 10,058.04 5,953,539.49 367,586.21 0.00 1,343.48 22,300.00 90.29 331.62 7,577.71 7,522.41 - 3,951.20 - 10,105.57 5,953,628.23 367,540.13 0.00 1,443.48 22,400.00 90.29 331.62 7,577.20 7,521.90 - 3,863.22 - 10,153.10 5,953,716.97 367,494.04 0.00 1,543.47 22,500.00 90.29 331.62 7,576.70 7,521.40 - 3,775.24 - 10,200.62 5,953,805.70 367,447.96 0.00 1,643.46 22,600.00 90.29 331.62 7,576.19 7,520.89 - 3,687.26 - 10,248.15 5,953,894.44 367,401.87 0.00 1,743.46 22,700.00 90.29 331.62 7,575.68 7,520.38 - 3,599.27 - 10,295.68 5,953,983.18 367,355.78 0.00 1,843.45 22,800.00 90.29 331.62 7,575.18 7,519.88 - 3,511.29 - 10,343.21 5,954,071.91 367,309.70 0.00 1,943.44 22,900.00 90.29 331.62 7,574.67 7,519.37 - 3,423.31 - 10,390.73 5,954,160.65 367,263.61 0.00 2,043.43 23,000.00 90.29 331.62 7,574.17 7,518.87 - 3,335.33 - 10,438.26 5,954,249.39 367,217.53 0.00 2,143.43 23,100.00 90.29 331.62 7,573.66 7,518.36 - 3,247.34 - 10,485.79 5,954,338.12 367,171.44 0.00 2,243.42 23,200.00 90.29 331.62 7,573.15 7,517.85 - 3,159.36 - 10,533.32 5,954,426.86 367,125.35 0.00 2,343.41 23,278.89 90.29 331.62 7,572.75 7,517.45 - 3,089.96 - 10,570.81 5,954,496.86 367,089.00 0.00 2,422.29 Start DLS 1.00 TFO 18.05 23,279.83 90.29 331.62 7,572.75 7,517.45 - 3,089.13 - 10,571.26 5,954,497.69 367,088.56 0.00 2,423.23 CD4 25wp05 T2 1 23,300.00 90.48 331.68 7,572.61 7,517.31 - 3,071.37 - 10,580.83 5,954,515.60 367,079.28 1.00 2,443.41 23,400.00 91.43 331.99 7,570.94 7,515.64 - 2,983.23 - 10,628.02 5,954,604.50 367,033.54 1.00 2,543.38 23,434.49 91.76 332.10 7,569.98 7,514.68 - 2,952.77 - 10,644.18 5,954,635.21 367,017.87 1.00 2,577.85 Start 897.54 hold at 23434.49 MD 23,435.43 91.77 332.10 7,569.95 7,514.65 - 2,951.94 - 10,644.62 5,954,636.05 367,017.45 1.00 2,578.79 23,500.00 91.77 332.10 7,567.96 7,512.66 - 2,894.90 - 10,674.82 5,954,693.57 366,988.19 0.00 2,643.32 23,600.00 91.77 332.10 7,564.87 7,509.57 - 2,806.56 - 10,721.58 5,954,782.65 366,942.87 0.00 2,743.25 23,700.00 91.77 332.10 7,561.78 7,506.48 - 2,718.22 - 10,768.34 5,954,871.72 366,897.55 0.00 2,843.18 23,800.00 91.77 332.10 7,558.70 7,503.40 - 2,629.89 - 10,815.11 5,954,960.80 366,852.24 0.00 2,943.12 23,900.00 91.77 332.10 7,555.61 7,500.31 - 2,541.55 - 10,861.87 5,955,049.88 366,806.92 0.00 3,043.05 24,000.00 91.77 332.10 7,552.52 7,497.22 - 2,453.21 - 10,908.63 5,955,138.96 366,761.61 0.00 3,142.99 11/10/2009 10:41:48AM Page 10 COMPASS 2003.16 Build 69 • • ConocoPhillips HALLIBURTON Standard Proposal Report Database: EDM v16 Prod Local Co- ordinate Reference: Well Plan: CD4 - 25 Company: ConocoPhillips(Alaska) Inc. TVD Reference: Plan: CD4 -25 (36.3 +19) @ 55.30ft (Doyon 19) Project: Western North Slope MD Reference: Plan: CD4 -25 (36.3 +19) @ 55.30ft (Doyon 19) Site: CD4 Nanuq Pad North Reference: True Well: Plan: CD4 - 25 Survey Calculation Method: Minimum Curvature Wellbore: Plan: CD4 - 25 Design: CD4 25wp06 Planned Survey Measured Vertical Map Map Depth inclination Azimuth Depth TVDss +N /-S +E/ -W Northing Easting DLS Vert Section (ft) (°) ( °) (ft) ft (ft) (ft) (ft) (ft) 7,494.13 24,100.00 91.77 332.10 7,549.43 7,494.13 - 2,364.87 - 10,955.40 5,955,228.04 366,716.29 0.00 3,242.92 24,200.00 91.77 332.10 7,546.35 7,491.05 - 2,276.53 - 11,002.16 5,955,317.12 366,670.97 0.00 3,342.85 24,300.00 91.77 332.10 7,543.26 7,487.96 - 2,188.19 - 11,048.92 5,955,406.20 366,625.66 0.00 3,442.79 i 24,332.03 91.77 332.10 7,542.27 7,486.97 - 2,159.90 - 11,063.90 5,955,434.74 366,611.14 0.00 3,474.80 1 TD at 24332.03 - 4-1/2" x 6 -3/4" 24,332.98 91.77 332.10 7,542.24 7,486.94 - 2,159.06 - 11,064.35 5,955,435.58 366,610.71 0.00 3,475.75 CD4- 25wp05 T1 Targets Target Name - hit/miss target Dip Angle Dip Dir. TVD +NI-S +E/ -W Northing Easting - Shape (°) (°) (ft) (ft) (ft) (ft) (ft) CD4- 25wp05 T3 0.00 0.00 7,587.02 - 5,506.61 - 9,265.45 5,952,059.49 368,354.77 1 - plan hits target center - Point CD4- 25wp05 T1 0.00 0.00 7,542.24 - 2,159.06 - 11,064.35 5,955,435.58 366,610.71 - plan hits target center 1 - Point CD4- 25wp05 T5 0.00 0.00 7,614.07 - 9,472.52 - 7,134.49 5,948,059.77 370,420.75 - plan misses target center by 28.78ft at 16008.48ft MD (7610.93 TVD, - 9492.32 N, - 7155.14 E) - Point CD4- 25wp05 T4 0.00 0.00 7,618.67 - 7,270.18 - 8,318.81 5,950,280.91 369,272.51 - plan hits target center - Point CD4- 25wp05 T2 0.00 0.00 7,572.75 - 3,089.13 - 10,571.26 5,954,497.69 367,088.56 - plan hits target center - Point Casing Points Measured Vertical Casing Hole Depth Depth Diameter Diameter (ft) (ft) Name ( ( °) 1 3,038.16 2,400.00 10 -3/4" x 13 -1/2" 10 -3/4 13 -1/2 1 16,196.93 7,614.07 7 -5/8" X 9 -7/8" 7 -5/8 9 -7/8 24,332.03 7,542.27 4 -1/2" x 6 -3/4" 4 -1/2 6 -3/4 11/10/2009 10:41:48AM Page 11 COMPASS 2003.16 Build 69 • • ConocoPhillips HALLIBURTON Standard Proposal Report Database: EDM v16 Prod Local Co- ordinate Reference: Well Plan: CD4 - 25 Company: ConocoPhillips(Alaska) Inc. TVD Reference: Plan: CD4 -25 (36.3 +19) © 55.30ft (Doyon 19) Project: Western North Slope MD Reference: Plan: CD4 -25 (36.3 +19) © 55.30ft (Doyon 19) Site: CD4 Nanuq Pad North Reference: True Welk Plan: CD4 - 25 Survey Calculation Method: Minimum Curvature Welibore: Plan: CD4 - 25 Design: CD4 25wp06 Formations Measured Vertical Vertical Dip Depth Depth Depth SS Dip Direction (ft) (ft) ft Name Lithology (1 (1 15,654.66 7,588.30 B3 sand 6,723.92 4,073.30 Basal K -3 14,770.29 7,445.30 UJU 13,415.08 7,080.30 Base HRZ 3,864.83 2,775.30 C -20 1 14,725.59 7,435.30 Alpine C 1 14,901.39 7,473.30 Alpine D 13,936.18 7,230.30 LCU- Miluveach 13,621.67 7,140.30 K -1 Marker 6,232.72 3,850.30 K -3 Marker 13,014.08 6,930.30 HRZ 11,464.10 6,225.30 Albian 96 6,807.62 4,111.30 K -2 Marker 7,043.31 4,218.30 Basal K -2 1 15,734.72 7,595.30 Alpine A Sand i 3,049.83 2,405.30 C -30 1 Plan Annotations Measured Vertical Local Coordinates Depth Depth +N /.S +EJ-W (ft) (ft) (ft) (ft) Comment 350.00 350.00 0.00 0.00 Start Build 2.00 800.00 798.15 -31.70 -15.46 Start DLS 3.00 TFO 0.00 2,600.00 2,201.08 - 947.83 - 462.29 Start 9689.45 hold at 2600.00 MD 12,289.45 6,600.00 - 8,707.45 - 4,246.91 Start DLS 2.50 TFO 94.00 12,969.17 6,910.30 - 9,197.24 - 4,596.85 Start Build 2.00 13,482.33 7,100.30 - 9,533.31 - 4,933.87 Start DLS 3.52 TFO 91.70 16,196.93 7,614.07 - 9,352.77 - 7,281.59 Start DLS 2.00 TFO 90.57 16,980.62 7,615.14 - 8,684.26 - 7,685.87 Start 1058.11 hold at 16980.62 MD 18,038.73 7,618.00 - 7,712.75 - 8,105.11 Start DLS 1.00 TFO -88.19 18,529.44 7,618.67 - 7,270.98 - 8,318.38 Start DLS 1.00 TFO 0.00 18,622.18 7,617.93 - 7,189.27 - 8,362.25 Start 1909.07 hold at 18622.18 MD 20,531.26 7,587.03 - 5,507.42 - 9,265.01 Start DLS 1.00 TFO - 166.59 20,596.79 7,586.33 - 5,449.73 - 9,296.08 Start 2682.10 hold at 20596.79 MD 23,278.89 7,572.75 - 3,089.96 - 10,570.81 Start DLS 1.00 TFO 18.05 23,434.49 7,569.98 - 2,952.77 - 10,644.18 Start 897.54 hold at 23434.49 MD 24,332.03 7,542.27 - 2,159.90 - 11,063.90 TD at 24332.03 11/10/2009 10:41:48AM Page 12 COMPASS 2003.16 Build 69 ConocoPhillips(Alaska) Inc. -WNS Western North Slope CD4 Nanuq Pad Plan: CD4 -25 Plan: CD4 -25 CD4- 25wp06 • Sperry Drilling Services Clearance Summary Anticollision Report 05 November, 2009 Tray. Cylinder North Proximity Scan on Current Survey Data (North Reference) Reference Design: CD4 Nanuq Pad - Plan: CD4 -25 - Plan: CD4-25 - CD4- 25wp06 Well Coordinates: 5,957,161.34 N, 1,517,741.31 E (70° 17' 30.60" N, 150° 59' 35.58" W) • Datum Height: Plan: CD4 -25 (36.3 +19) @ 55.30ft (Doyon 19) Scan Range: 0.00 to 24,332.03 ft. Measured Depth. Scan Radius is 2,629.57 ft . Clearance Factor cutoff is Unlimited. Max Ellipse Separation is Unlimited Geodetic Scale Factor Applied Version: 2003.16 Build: 69 Scan Type: GLOBAL FILTER APPLIED: All wellpaths within 200'+ 100/1000 of reference Scan Type: 25.00 HALLIBURTON Sperry Drilling Services GLOBAL FILTER APPLIED: All we llpaths within 200'+ 100/1000 of reference 10:45, November 05 2009 3 CD4- 25wpO6 Ellipsoid Color 36.30 To 24332.03 36 250 1750 2000 5000 6000 14000 1600C D4 - 250 500 2000 2500 6000 7000 16000 1800C - D4 - 1I? 500 CD4 750 2500 3000 7000 8000 18000 2000C CD4 -32 3D4 -320 'D4 -21� 0 / 360 750 1000 3000 3500 8000 9000 20000 2500C ����e i)Ipt 1000 1250 3500 4000 90 00 10000 �. �, :Wi � fin" 3D4 -21 w ��1� �I /� � 1250 150 40 4500 10000 12000 -30 / 330 - - ,, l auk \i ` ��� /�(i► ! g ,,, i i � 30 D4-24w p14 1500 1750 4500 5000 12000 14000 . ...f � f - r z • . ,11 x 1b b P o beV. C � . i (1 vl� /l� � � D42E ° . � � 'sv �"�v Dr;7 L A Pfir . `e i�ti� fF ;� l ` ' I � x _ 3D4 -21C CD4 -32 � - ". • ,' t ih t ii∎ r„ 0 - 7 44 t Y _ ` ��� �R'• J � a �'o �' t y �. a CD4- 213Wp06 Vanuq ��M „,s...0, o � s • z - * \ �\ = 60 / 300 44,14` is �� a g' � y ' '- ,� 4 14. 4 = � A < 60 C D 4 - 23wp0>� fit& 0/360 3D4 -315 u.��s � r g , ! r � p @:!$ti s r� - - m v ;t� • ” ��\ ;kky 1 i� '11/4-1414134' ,� CD4 -322 ill n tlr6�rd'�.1 -�` „� Yu q s r � •<a� i �1 Oi 1 � ' � CD4- 318PB1 Na 10 - -• K r,- 01.'4 ! • ( ,, 30 / 330 �� 30 �r Tr"�!„a �� �9p �/1' evil . v / �i�e .s- CD4.24wp1f 7 .S" /41141 : r� V > _ r I }�` 4-in..- 3D4 318l� 3 �� _-.1.0.y./..%,*...--,:::: •j� a i j � .. ��• ',, \\ + , e. . �M{ �� ♦ \; w a 1 1 ° x v ______ � , ''��i. �� 6 60 / 30 i oti Sy z . , ■ 60 „. 90 / 270 - �i ...., , R 90 CD4 -26 � �, / ������� � , A P Ari .. � 90/270 � 90 CD4 -319 120 / 240 ` ti � 120 �'� 120 / 240 120 200 . � z .�\ ” ' Oh dM� 150/210 150 -150 / 210 _.� ` 150 50 300 -180 / 180 -180 / 180 Travelling Cylinder Azimuth (TFO +AZI) [O] vs Centre to Centre Separation [25 tUin] ConocoPhillips(Alaska) Inc. -WNS HALLI BURTON Western North Slope Anticollision Report for Plan: CD4 -25 - CD4- 25wp06 Tray. Cylinder North Proximity Scan on Current Survey Data (North Reference) Reference Design: CD4 Nanuq Pad - Plan: CD4 -25 - Plan: CD4 -25 - CD4- 25wp06 Scan Range: 0.00 to 24,332.03 ft. Measured Depth. Scan Radius is 2,629.57 ft . Clearance Factor cutoff is Unlimited. Max Ellipse Separation is Unlimited Measured Minimum @Measured Ellipse @Measured Clearance Summary Based on Site Name Depth Distance Depth Separation Depth Factor Minimum Separation Warning Comparison Well Name - Wellbore Name - Design (ft) (ft) (ft) (ft) ft CD4 Nanuq Pad . CD4-05 - CD4-05 - CD4-05 24,326.57 322.40 24,326.57 79.79 14,475.00 1.329 Clearance Factor Pass - Major Risk CD4 -16 - CD4 -16 - CD4-16 539.83 173.74 539.83 162.10 550.00 14.931 Centre Distance Pass - Major Risk CD4 -16 - CD4-16 - CD4-16 797.03 178.72 797.03 161.28 825.00 10.247 Clearance Factor Pass - Major Risk CD4 -17 - CD4-17 - CD4 -17 1,057.38 122.79 1,057.38 102.72 1,100.00 6.120 Centre Distance Pass - Major Risk CD4 -17 - CD4-17 - CD4 -17 1,079.68 122.81 1,079.68 102.39 1,125.00 6.016 Clearance Factor Pass - Major Risk CD4 -210 - CD4 -210 - CD4 -210 1,457.00 282.09 1,457.00 254.95 1,575.00 10.392 Centre Distance Pass - Major Risk CD4 -210 - CD4 -210 - CD4 -210 1,479.08 282.14 1,479.08 254.77 1,600.00 10.309 Clearance Factor Pass - Major Risk CD4 -213 - CD4 -213 - CD4- 213wp06 73.65 239.88 73.65 238.31 75.00 152.476 Centre Distance Pass - Major Risk CD4 -213 - CD4 -213 - CD4- 213wp06 2,041.24 241.57 2,041.24 203.97 2,175.00 6.424 Clearance Factor Pass - Major Risk CD4 -213 - CD4 -213 - CD4 -213 73.65 239.88 73.65 238.31 75.00 152.476 Centre Distance Pass - Major Risk CD4 -213 - CD4 -213 - CD4 -213 2,041.24 241.57 2,041.24 203.97 2,175.00 6.424 Clearance Factor Pass - Major Risk CD4 -214 - CD4 -214 - CD4 -214 1,438.59 139.31 1,438.59 114.46 1,525.00 5.606 Centre Distance Pass - Major Risk CD4 -214 - CD4 -214 - CD4 -214 1,461.18 139.50 1,461.18 114.37 1,550.00 5.552 Clearance Factor Pass - Major Risk CD4 -215 - CD4 -215 - CD4 -215 1,300.00 142.52 1,300.00 118.18 1,375.00 5.856 Clearance Factor Pass - Major Risk CD4-26 - CD4-26 - CD4-26 299.20 19.25 299.20 12.90 300.00 3.032 Centre Distance Pass - Major Risk CD4-26 - CD4-26 - CD4-26 399.42 20.26 399.42 11.74 400.00 2.378 Clearance Factor Pass - Major Risk CD4 -318 - CD4 -318 - CD4 -318 1,170.54 114.58 1,170.54 92.75 1,225.00 5.248 Centre Distance Pass - Major Risk III CD4 -318 - CD4 -318 - CD4 -318 1,192.96 114.69 1,192.96 92.43 1,250.00 5.152 Clearance Factor Pass - Major Risk CD4 -318 - CD4 -318A - CD4 -318A 1,169.61 114.59 1,169.61 92.66 1,225.00 5.227 Centre Distance Pass - Major Risk CD4 -318 - CD4 -318A - CD4 -318A 1,192.02 114.67 1,192.02 92.32 1,250.00 5.130 Clearance Factor Pass - Major Risk CD4 -318 - CD4- 318PB1 - CD4- 318PB1 1,170.54 114.58 1,170.54 92.59 1,225.00 5.211 Centre Distance Pass - Major Risk CD4 -318 - CD4- 318PB1 - CD4- 318PB1 1,192.96 114.69 1,192.96 92.27 1,250.00 5.116 Clearance Factor Pass - Major Risk CD4 -319 - CD4 -319 - CD4 -319 887.03 103.55 887.03 86.35 900.00 6.020 Centre Distance Pass - Major Risk CD4 -319 - CD4 -319 - CD4 -319 960.51 104.53 960.51 85.67 975.00 5.545 Clearance Factor Pass - Major Risk CD4 -320 - CD4 -320 - CD4 -320 445.66 98.31 445.66 88.74 450.00 10.273 Centre Distance Pass - Major Risk CD4 -320 - CD4 -320 - CD4 -320 494.05 98.76 494.05 88.12 500.00 9.282 Clearance Factor Pass - Major Risk CD4 -320 - CD4- 320PB1 - CD4- 320PB1 445.66 98.31 445.66 88.74 450.00 10.273 Centre Distance Pass - Major Risk CD4 -320 - CD4- 320PB1 - CD4- 320PB1 494.05 98.76 494.05 88.12 500.00 9.282 Clearance Factor Pass - Major Risk 05 November, 2009 - 10:36 Page 2 of 5 COMPASS ConocoPhillips(Alaska) Inc. -WNS HALLIBURTON Western North Slope Anticollision Report for Plan: CD4 -25 - CD4- 25wp06 Tray. Cylinder North Proximity Scan on Current Survey Data (North Reference) Reference Design: CD4 Nanuq Pad - Plan: CD4 -25 - Plan: CD4-25 - CD4- 25wp06 Scan Range: 0.00 to 24,332.03 ft. Measured Depth. Scan Radius is 2,629.57 ft . Clearance Factor cutoff is Unlimited. Max Ellipse Separation is Unlimited Measured Minimum @Measured Ellipse @Measured Clearance Summary Based on Site Name Depth Distance Depth Separation Depth Factor Minimum Separation Warning Comparison Well Name - Wellbore Name - Design (ft) (ft) (ft) (ft) ft CD4 -321 - CD4 -321 - CD4 -321 885.89 55.73 885.89 38.05 900.00 3.152 Centre Distance Pass - Major Risk CD4 -321 - CD4 -321 - CD4 -321 909.53 56.03 909.53 37.96 925.00 3.100 Clearance Factor Pass - Major Risk • CD4 -322 - CD4 -322 - CD4 -322 620.62 46.86 620.62 34.18 625.00 3.697 Centre Distance Pass - Major Risk CD4 -322 - CD4 -322 - CD4 - 322 669.68 47.14 669.68 33.67 675.00 3.500 Clearance Factor Pass - Major Risk Nanuq 3 - Nanuq 3 - Nanuq 3 263.30 39.80 263.30 34.98 250.00 8.256 Centre Distance Pass - Major Risk Nanuq 3 - Nanuq 3 - Nanuq 3 464.29 41.81 464.29 33.26 450.00 4.891 Clearance Factor Pass - Major Risk Plan: CD4-23 - Plan: CD4-23 - CD4- 23wp08 498.16 36.50 498.16 25.86 500.00 3.432 Centre Distance Pass - Major Risk Plan: CD4-23 - Plan: CD4-23 - CD4- 23wp08 547.26 37.18 547.26 25.47 550.00 3.175 Clearance Factor Pass - Mal rr Risk Plan: CD4-24 - Plan: CD4-24 - CD4-24wp10 350.00 20.12 350.00 12.67 350.00 2.701 Centre Distance Pass - Major Risk Plan: CD4-24 - Plan: CD4-24 - CD4- 24wp10 846.80 26.63 846.80 8.37 850.00 1.458 Clearance Factor Pass - Major Risk Nanuk Nanuk 2 - Nanuk 2 - Nanuk 2 5,294.50 323.12 5,294.50 211.44 3,675.00 2.893 Centre Distance Pass - Major Risk Nanuk 2 - Nanuk 2 - Nanuk 2 5,347.72 328.37 5,347.72 206.92 3,750.00 2.704 Clearance Factor Pass - Major Risk Survey tool program • From To Survey /Plan Survey Tool (ft) (ft) 36.30 1,000.00 CD4- 25wp06 CB- GYRO -SS 1,000.00 24,332.03 CD4- 25wp06 MWD +IFR- AK- CAZ -SC Ellipse error terms are correlated across survey tool tie-on points. Calculated ellipses incorporate surface errors. Separation is the actual distance between ellipsoids. Distance Between centres is the straight line distance between wellbore centres. Clearance Factor = Distance Between Profiles / (Distance Between Profiles - Ellipse Separation). All station coordinates were calculated using the Minimum Curvature method. 05 November, 2009 - 10:36 Page 3 of 5 COMPASS ConocoPhillips(Alaska) Inc. -WNS HALLIBURTON Western North Slope Anticollision Report for Plan: CD4 -25 - CD4- 25wp06 Direction and Coordinates are relative to True North Reference. Vertical Depths are relative to Plan: CD4 -25 (36.3 +19) @ 55.30ft (Doyon 19). Northing and Easting are relative to Plan: CD4 -25. Coordinate System is US State Plane 1983, Alaska Zone 4. Central Meridian is - 150.00 °, Grid Convergence at Surface is: -0.94 °. Ladder - Pint - - - - LEGEND • r l a; • � 1 Jl �3 f + -a- Nanuk ?, Nanuk2,Nanuk2 V1 I I I N !' i ! {4 1 :. i 1 1 � © 1 1� 1 -9- CD4 -05, CD4.05,C04 -O5 VO 2250 t ', y�'_IAai 1 1 i Ii1 - CD4 -16, CD4- 16,C04.16 V2 p 1'4' �' V I 1 •�11 1 '� CD4.17,CD4.17,CD4 -17 V13 Li) r §; , 1 I `.z {:y`i1. 1 fr ` : "1l 1 1 °i ` j� -4 CD4.210,CD4.210,CD4 -210V3 �-' 1 � 1 ? 9 . :' 1 - - - 1 li Y I •' • ' -- - - - ¢�� f/j. ,' lL 94 C D4.213 , C D4213 ,CD4 -213 V4 t! �� ' : � : 1 - C04.213,CD4- 213,004- 213wp06 VO 03 i ? ,ff r S'� M 1 I` 1 1 -e- CD4.214,C04.214,C04 -214 C 150 r . , � s: •y ti 1 11 Q 1 , 1 , i ri CD4.215,CD4215,C04.215V4 4) 1 i ¢{iii N ' J i A 1 -- CD4.26, CD4.26,CD4.26 VO + F j � ' . • 1 - - i - IN i -6- CD4- 318,CD4- 318,CD4.318 V6 Q ` - i . i pir, '- !,� %.:' 1 Tj 1 1 Il -# CD4- 318,CD4- 318A,CD4.318AV5 >v CD 11 - C04.318,C04- 318PB1,C04.318PB1 V3 y �i � ' � �i 1 � 1 I ■� `'�'T�I 1 1 r _ Al 1 -g- CD4- 319,CD4-319,CD4.31Q V5 750 O r{r. q , ' AV lit i 4r CD4 - 320,004- 320,004.320 V7 - :.� 1 CD4 -320, CD4- 320PB1,CD4- 320PB1 V 0. _ , �.� .., T r _ 1 1 • " 5�. j + I . _ _ _ - _ -- CD4 - 321,004 - 321,004 -321 V16 e�c f:: -1 J. -; rl • C? . ' _ '. 1 I 1 1 " 1 4f4— 0D4 322,004.322,004 - 322 V8 ~, -. 1 1 I 1 1 1 1 1 - Nanuq 3,Nanuq 3,Nanuq 3 V1 0 ' � I —I- Plan :CD4- ?3,PIan:C04 - ?3, CD4- 23wp08V0 0 4500 9000 13500 18000 22500 -I- Plan: CD4 -24, Plan: CD4 -24, CD4.24wp 10 VO Measured Depth (4500ftfin) - CD4- 25wp06 05 November. 2009 - 10 :36 Page 4 of 5 COMPASS ConocoPhillips(Alaska) Inc. -WNS HALLIBURTON Western North Slope Anticollision Report for Plan: CD4 -25 - CD4- 25wp06 Clearance Factor Plot: Measured Depth versus Separation(Clearance) Factor ill mitt 1 lox, 1 fill' - LEG ENO I! j I f 1 - ; , i 1 _ I,. I .� N 50 ' I i 1 '. m CD405, CD4D5,CD405 • i 4. — i - I ' �1111 Il -9- 00416, 00416, 10 D 4-16 V2 I,' �� 00417,00417,0 0417 V13 • - _ ! - ( til 1.11 [rail 11 - CD421 D, CD4 -210, C D4 -210 V3 _ I I -X- CD4213,CD4.213, 004213 V4 - I. It 11 lir 1 � i. — C04213, CD4 213,CD4 213wp06 VO o • °� - - r1ii a 1! 1 a - - CD4214,C04- 214,004 -214 V3 - "41. 11 III " 11 I -X- 004215, C D4 -215, CD4215 V4 12 .7 -8- CD4-26, CD4-26,CD426 V0 ■ o _ III 4 ' 'e , 1i 7 � �. CD4318 318,CD4.3 ns — frpreirpie ( ( I ) — — CD4318. CD4. 318A ,CD43 18AV5 3;5 _�� ��' _; ' � �� $. CD4- 318,CD4318PB1,C04318PB1 V3 i � h r s- li i - - 00431$, CD4- 319,CD4.319 VS • `�' �i� } a!� L � I - - C04320, C04.320, C 04 -320 V7 = ``v - CD4- 320,CD4.32DPB1,C0432DPB1 V4 t 1 1 $ CD4-321, C04-321, CD4 -321 V16 11 i - CD4-322, CD4- 322,C04.322 V8 • — -- Nanuq 3, Nanuq 3, Nanuq 3 V1 i -t- Plan :CD4- 23,P Ian: C04-23,C 04- 23w pee W - -j- Plan:C04- 24,P Ian: C0424,C 04- 24wp10V0 0,70 , I I I 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 I I 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 • DX. 40)3 .I 3 ;r fir)) 13703 IPY..0 i� 70 Ie700 1000 _TA.? JO)? 9 - CD425wp06 Measured Depth (4000 Min) 05 November. 2009 - 10:36 Page 5 of 5 COMPASS GLOBAL FILTER APPLIED: All wellpaths within 200'+ 100/1000 of reference 10:47, November 05 2009 3 CD4- 25wp06 Ellipsoid Color 36.30 To 500.00 36 250 1750 2000 5000 6000 14000 1600C 250 500 2000 2500 6000 7000 16000 1800C 500 750 2500 3000 7000 8000 18000 2000C 0 /360 750 1000 3000 3500 8000 9000 20000 2500C 300 1000 1250 3500 4000 9000 10000 30 / 330 30 1250 1500 4000 4500 10000 12000 1500 1750 4500 5000 12000 14000 I 200 ! 1 -60 / 300 - 60 0 / 360 50 3D4 -21 ¢ -30 / 330 30 I►__ -i �• 23wp0E � ,. o D4 -213w Os. eal DA� rt F n; r4,,.Ak • p ® ' �� CD4- 24wp1C da ia 60 / 300 60 ' ' � 2 G 111-=r �al A t ia ra - ' D4 -31' ",;, 901270 �� r° ` 90 �C� �/ � . CD4 -26 � - 1 4 (�1 11�1 {( so / 270 , , so Nanuq 3 - - ��,i j -120 / 240 120 -120 / 240 120 200 -150 / 210 150 -150 / 210 150 50 -180 / 180 300 -180 / 180 Travelling Cylinder Azimuth (TFO+AZI) [ vs Centre to Centre Separation [25 ft/in] GLOBAL FILTER APPLIED: All wellpaths within 200'+ 100/1000 of reference 10:48, November 05 2009 CD4- 25wp06 Ellipsoid Color 500.00 To 1000.00 36 " "" " " 250 1750 — 2000 5000 6000 14000 1600C 250 500 2000 2500 6000 7000 16000 - 1800C 500 750 2500 3000 7000 8000 18000 2000C 0 / 360 750 1000 3000 3500 8000 9000 20000 –. 2500C 300 1000 1250 3500 4000 9000 10000 D4- 320PB �, tt 1250 1500 4000 4500 10000 12000 - / 330 T "" 1500 1750 4500 5000 12000 14000 PM ■ D4 -23wp r: ^�//. ► i. ..0 200 jj ill fir4�, __ � _en t oc� ; CD4- 23wp0E 1 • � � ; -60 / 300 ■ • �' t∎ le & E, .• 60 o4 0/360 , STOkrA CD4- 24wp1C *el MESE' ∎* 1q� �ai!`, '1:: • ���04 . � w CD4 -322 i , " ' . C D4- 213w � � 4,4a. ∎ice D4 -32 a r M ♦ •� anu ; i �N y ' ! / %i; -4, "' -21: �li ik i 1 .. ; yry _J -60 / 300 / 4 % 0l�e 60 -90 / 270�ar- � 90 CD -2 6 � ��� 1 >; Villr e� � , Al. ►� iii ��� ___ iD4 -31, 102 •44 11:::.., ' Nanuq . '- v��v4 ',.;; 5 l /llll l ll��, / / � ddlir 90 / 270 a c.�r r yy � ` — � ?j/ 90 -120 / 240 120 -120 / 240 120 ID 200 -150 / 210 150 -150 / 210 150 50 -180 / 180 300 -180 / 180 Travelling Cylinder Azimuth (TFO +AZI) [ vs Centre to Centre Separation [25 ft/in] GLOBAL FILTER APPLIED: All wellpaths within 200'+ 100/1000 of reference 10:49, November 05 2009 CD4- 25wp06 Ellipsoid Color 1000.00 To 1500.00 CD4- 23wp08 36 250 1750 2000 5000 6000 14000 1600' CD4 -18 250 500 2000 2500 6000 7000 16000 1800. CD4 -1 CD4- 320PB1 3D4 -32C 500 750 2500 3000 7000 8000 18000 20004 2D4 -32e d / 360 750 1000 3000 3500 8000 9000 20000 2500• � � 1000 1250 3500 4000 9000 10000 � �fI y Pik a i1►.�I�� ` �� q �� P 6.I 1250 1500 4000 4500 10000 12000 - / 330 1I� " 1i►,!�� „� 4,1 ► vig � 30 1500 1750 4500 5000 12000 14000 ■ IA seg ..../ D4 - 32, ` ��• 4: � t��, ,;,, &,2 �� .: , � =1 ' ! .7 . 1! k, Q ' - - �, ��`� �� ^�dor'.� %1 ►:*.. -60 / 300 ,4 0 . _ It 4 D 4.., s0 X 44 4 ► 0 � 4 1 • : • i io l/r CD4 -21 ¢ 0 / 360 EGI yvdyr� is �� q ,V 1 CD4- 24wp1C +' d7�i� �A � � :._ �Qt � � p / 9 9 lti j r�* ��� *1Y3,44 4 1 . 0' 30 / 330 30 CD4- 318P61 - -•twirk 012,1 /% .. � � rtroip' 7 .110 4 4)) %d A i%/ 4 CD4- 213wp06 Mir/ 3D4 -318F. �� % ' - • ^��� 3i 4 -24wp1 a - - - \\ 3D4 -21:. -60 / / Ilik 300 60 CD4 -2E 90 / 270 90 Agii .......,... .... ,..„............: -90 / 270 ` 90 a II � -120 / 240 120 -120 / 240 120 200 -150 / 210 150 -150 / 210 150 50 -180/180 300 -180 / 180 Travelling Cylinder Azimuth (TFO +AZI) [ °] vs Centre to Centre Separation [25 ft /in] GLOBAL FILTER APPLIED: All wellpaths within 200'+ 100/1000 of reference 10:50, November 05 2009 3 CD4- 25wp06 Ellipsoid Color 1500.00 To 2000.00 :D4-17 36 250 1750 2000 5000 6000 14000 1600C 250 500 2000 2500 6000 7000 16000 1800C 500 750 2500 - 3000 7000 8000 18000 2000C 7.,D4 -21z 0 / 360 750 1000 3000 3500 8000 9000 20000 2500C CD4 - 21E 300 1000 1250 3500 4000 9000 10000 30 / 330 % 30 1250 1500 4000 4500 10000 12000 1500 1750 4500 5000 12000 14000 CD4 -32' ::D4-2E_ �. 0 7 1 CD4 -210 -60 / 300 . - . ` . ♦� /`� ''._60 ��� � �: 0 / 360 ,,.� 50 CD4 411144/4 - �'` t -30 / 330 30 CD4- 318PB1 - D4- 213wp06 :D4 24wp10 NI' - :D4 -3181 `\ D4 -21 -60 / 300 60 -90 / 270 90 ilk - 90 / 270 90 10 -120 / 240 120 ( \ -120 / 240 120 200 , `CD4 -31� -150 / 210 150 -150 / 210 150 50 -180 / 180 300 -180 / 180 Travelling Cylinder Azimuth (TFO +AZI) [°] vs Centre to Centre Separation [25 Win] GLOBAL FILTER APPLIED: All wellpaths within 200'+ 100/1000 of reference 10:51, November 05 2009 t CD4- 25wp06 Ellipsoid Color 2000.00 To 2500.00 36 250 1750 2000 5000 6000 14000 16000 250 500 2000 2500 6000 7000 16000 18000 500 750 2500 3000 7000 8000 18000 2000C 2D4 -21Z 0 / 360 750 1000 3000 3500 8000 9000 20000 2500C 300 1000 1250 3500 4000 9000 10000 1250 1500 4000 4500 10000 12000 30 / 330 - ; 410 4 30 1500 1750 4500 5000 12000 14000 2D4 -2€ sV: 44, ��" 200 ^ • �� �/ CD4- 213wp06 -60 / 300 � / r; _ ; �. -...• D4-21; 0 / 360 D4 -24wp1 7 t -Z� 50 ; 4, -30 / 330 's 30 4% .,) N\1/4. -60 / 300 -90 / 270 90 ilk -90 / 270 - 90 101 -120 / 240 120 • /\ -120 / 240 120 200 ` 17 150 CD4 -31 15 / 210 50 150 -150 / 210 -180 / 180 300 -180 / 180 Travelling Cylinder Azimuth (TFO +AZI) [ vs Centre to Ccntrc Separation [25 ft/in] GLOBAL FILTER APPLIED. All wellpaths within 200'+ 100/1000 of reference 10:53, November 05 2009 CD4- 25wp06 Ellipsoid Color 2500.00 To 3000.00 36 " " "" 250 1750 — 2000 5000 6000 14000 16001 250 500 2000 2500 6000 7000 16000 18001 500 750 2500 3000 7000 8000 18000 2000' 0 / 360 750 1000 3000 3500 8000 9000 20000 2500' 300 1000 1250 3500 4000 9000 10000 30 / 330 30 1250 1500 4000 4500 10000 12000 1500 " "" " 1750 4500 5000 12000 14000 200 , D4- 213wp06 60 / 300 hy24wp1 i 60 D4 -21: �� 0 / 360 50 I r -30 / 330 30 -60 / 300 60 - 90 / 270 90 Ali -90 / 270 90 -120 / 240 120 120 / 240 IF 120 200 (tc..,, 1 )� ,D4 -31f -150 / 210 150 -150 / 210 1 150 50 -180 / 180 300 -180 / 180 Travelling Cylinder Azimuth (TFO+AZI) [ vs Centre to Centre Separation [25 ft/in] GLOBAL FILTER APPLIED All wellpaths within 200'+ 100/1000 of reference 10 :54, November 05 2009 .. CD4- 25wp06 Ellipsoid Color 3000.00 To 4000.00 36 250 1750 2000 5000 6000 14000 1600C 250 500 2000 2500 6000 7000 16000 1800C 500 750 2500 3000 7000 8000 18000 2000C 0 / 360 750 1000 3000 3500 8000 9000 20000 2500C 300 1000 1250 3500 4000 9000 10000 30 / 330 30 1250 1500 4000 4500 10000 12000 1500 1750 4500 5000 12000 14000 D4- 24wp14 200 • 60/300 ;/� \ \ 60 0/360 \ 50 - 30 / 330 30 10 / /lam -60 / 300 60 - 90 / 270 90 -90 / 270 90 1i. i ' -120 / 240 X120 �D4 -315 • `� .• - 120 / 240 120 200 �� ----. • •: -150 / 210 150 -150 /211 150 50 -180 / 180 300 -180 / 180 Travelling Cylinder Azimuth (TFO+AZI) [ vs Centre to Centre Separation [25 ft/in] 1 GLOBAL FILTER APPLIED: All wellpaths within 200'+ 100/1000 of reference 10:55, November 05 2009 i CD4- 25wpO6 Ellipsoid Color 4000.00 To 5000.00 36 250 1750 2000 5000 6000 14000 1600C 250 500 2000 2500 6000 7000 16000 1800C 500 750 2500 3000 7000 8000 18000 2000C 0 / 360 750 1000 3000 3500 8000 9000 20000 2500C 300 1000 1250 3500 "" 4000 9000 10000 P 1250 1500 4000 4500 10000 12000 30 D4- 24w 1500 1750 4500 5000 12000 14000 200 -60 � 60 \�_ l�10, 0 / 360 \ � r : �7/,1', 50 \`\ \\ - 30/330 30 � -60 / 300 60 . „ ... . . 90 / 270 [- iiii� . 9 • I II k MP I , -90 / 270 90 -120 / 240 120 D4 -31 -120 / 240 120 200 IF 150 /210 150 150 /210 150 50 -180 / 180 300 -180 / 180 Travelling Cylinder Azimuth (TFO +AZI) [°] vs Centre to Centre Separation [25 ft /in] 1 GLOBAL FILTER APPLIED: All wellpaths within 200'+ 100/1000 of reference 10:56, November 05 2009 CD4- 25wp06 Ellipsoid Color 5000.00 To 6000.00 36 250 1750 2000 5000 6000 14000 16001 250 500 2000 2500 6000 7000 16000 18001 500 750 2500 3000 7000 8000 18000 20001 0 / 360 750 1000 3000 3500 8000 9000 20000 25001 300 1000 1250 3500 4000 9000 10000 CD4- 24wp10 1250 1500 4000 4500 10000 12000 - / 330 30 1500 1750 4500 5000 12000 14000 200 \v, � �` -60 / 300 0 / 360 60 50 -30 / 330 30 1 - 60 / 300 60 -90 / 270 - - - - - -- i 90 I 1 1 0 / I 1. . -90 / 270 90 \ VLF .., -120 / 240 \ 120 -120 /240 11111111111111 120 200 - 150 / 210 150 -150 / 210 150 50 -180 / 180 300 -180 / 180 Travelling Cylinder Azimuth (TFO+AZI) [°] vs Centre to Centre Separation [25 ft/in] GLOBAL FILTER APPLIED: All wellpaths within 200'+ 100/1000 of reference 10:56, November 05 2009 4 CD4-25wp06 Ellipsoid Color 6000.00 To 7000.00 36 250 1750 2000 5000 6000 14000 1600C 250 500 2000 2500 6000 7000 16000 1800C 500 750 2500 3000 7000 8000 18000 2000C 0 / 360 750 1000 3000 3500 8000 9000 20000 2500C 300 1000 1250 3500 4000 9000 10000 1250 1500 4000 4500 10000 12000 - / 330 �� 1500 1750 4500 5000 12000 14000 200 • -60 / 300 60 0 / 360 50 30 / 330 30 Al 10� 0 _60/ 300 60 - 90 / 270 I 90 Ali -90 / 270 90 -120 / 240 120 -120 1 2 0 120 200 150 /210 IF 150 -150 / 210 150 50 - 180 / 180 300 - 180/180 Travelling Cylinder Azimuth (TFO +AZI) [ vs Centre to Centre Separation [25 Win] GLOBAL FILTER APPLIED: All wellpaths within 200'+ 100/1000 of reference 10:58, November 05 2009 CD4- 25wp06 Ellipsoid Color 7000.00 To 20000.00 36 250 1750 2000 5000 6000 14000 16000 250 500 2000 2500 6000 7000 16000 1800' 500 750 2500 3000 7000 8000 18000 2000' 0 / 360 750 1000 3000 3500 8000 9000 20000 25000 300 1000 1250 3500 4000 9000 10000 30 / 330 30 1250 1500 4000 4500 10000 12000 1500 1750 4500 5000 12000 14000 i dli 200 -60 / 300 60 0 / 360 50 -30 / 330 30 l -60 / 300 60 -90 / 270 90 gip" Aik -90 / 270 90 -120 / 240 120 -120 / 240 120 200 150 /210 150 150/21 150 50 -180 / 180 300 -180 / 180 Travelling Cylinder Azimuth (TFO +AZI) [ vs Centre to Centre Separation [25 ft/in] GLOBAL FILTER APPLIED: All wellpaths within 200'+ 100/1000 of reference 10:59, November 05 2009 CD4- 25wp06 Ellipsoid Color 20000.00 To 21000.00 36 250 1750 2000 5000 6000 14000 16001 250 500 2000 2500 6000 7000 16000 1800. 500 750 2500 3000 7000 8000 18000 20001 0 / 360 750 1000 3000 3500 8000 9000 20000 25000 300 1000 1250 3500 4000 9000 10000 1250 1500 4000 4500 10000 12000 - 30 / 330 30 1500 1750 4500 5000 12000 14000 20. -60 / 300 60 0 / 360 50 -30 / 330 30 10• MI -60 / 300 60 -90 / 270 90 -90 / 270 90 -120 / 240 120 -120 / 240 120 200 -150 / 210 150 -150 / 21. 150 50 -180 / 180 300 -180 / 180 Travelling Cylinder Azimuth (TFO +AZI) [°] vs Centre to Centre Separation [25 ft/in] GLOBAL FILTER APPLIED: All wellpaths aths within 200'+ 100/1000 of reference 10:59, November 05 2009 3 CD4- 25wp06 Ellipsoid Color 21000.00 To 22000.00 36 250 1750 2000 5000 6000 14000 1600C 250 500 2000 2500 6000 7000 16000 1800C 500 750 2500 3000 7000 8000 18000 20000 0 / 360 750 1000 3000 3500 8000 9000 20000 2500C 300 1000 1250 3500 4000 9000 10000 1250 1500 4000 4500 10000 12000 - 30 / 330 30 1500 1750 4500 5000 12000 14000 200 • 60 / 300 / 60 0 / 360 50 •1111 #11 30 eu 10I i ►iii f / -60 / 60 -90 / 270 - 1 I 90 Ali -90 / 270 90 1 '' -120 / 240 120 -120 / 240 120 al 200 IF 150 /210 150 150 /210 150 50 -180 / 180 300 -180 / 180 Travelling Cylinder Azimuth (TFO+AZI) [ vs Centre to Centre Separation [25 ft/in] GLOBAL FILTER APPLIED: All wellpaths within 200'+ 100/1000 of reference 11:00, November 05 2009 9 CD4- 25wpO6 Ellipsoid Color 22000.00 To 23000.00 36 250 1750 2000 5000 6000 14000 1600C 250 500 2000 2500 6000 7000 16000 1800C 500 750 2500 3000 7000 8000 18000 2000C 0 / 360 750 1000 3000 3500 8000 9000 20000 2500C 300 —� 1000 1250 3500 4000 9000 10000 1250 1500 4000 4500 10000 12000 30 / 330 \30 1500 1750 4500 5000 12000 14000 M) • -60 / 300 60 0 / 360 50 -30 / 330 30 10 � -60 / 300 60 -90 / 270 - 90 /II -90 / 270 90 1si -120 / 240 120 -120 / 240 120 200 -150 / 210 150 -150 / 210 150 50 -180 / 180 300 -180 / 180 Travelling Cylinder Azimuth (TFO +AZI) [ °] vs Centre to Centre Separation [25 ft /in] GLOBAL FILTER APPLIED: All wellpaths within 200'+ 100/1000 of reference 11:00, November 05 2009 CD4- 25wp06 Ellipsoid Color 23000.00 To 24000.00 36 "" "" 250 1750 2000 5000 6000 14000 16001 250 500 2000 2500 6000 7000 16000 18001 500 750 2500 3000 7000 8000 18000 20001 0 /360 750 1000 3000 3500 8000 9000 20000 25001 311 1000 1250 3500 "" 4000 9000 10000 30 / 330 I 3 1250 1500 4000 4500 10000 12000 1500 1750 4500 5000 12000 14000 VW 4 ''' ` •- --- - 60/300 - •-- - --�- 60 0 / 360 �_= 30 / 330 50 30 101 60 / 300 60 -90 / 270 - 90 I I I • F l 1 P -90 / 270 90 -120 / 240 120 -120 / 240 IILII 120 200 -150 / 210 150 -150 / 210 150 50 -180 / 180 300 -180 / 180 Travelling Cylinder Azimuth (TFO+AZI) [ vs Centre to Centre Separation [25 ft /in] GLOBAL FILTER APPLIED: All wellpaths within 200'+ 100/1000 of reference 11:01, November 05 2009 CD4- 25wp06 Ellipsoid Color 24000.00 To 24332.03 36 250 1750 2000 5000 6000 14000 1600C 250 500 2000 2500 6000 7000 16000 1800C 500 750 2500 3000 7000 8000 18000 2000C 0 /360 750 1000 3000 3500 8000 9000 20000 2500C I 1000 1250 3500 4000 9000 10000 30 / 330 1250 1500 4000 4500 10000 12000 N......„_ 1500 1750 4500 5000 12000 14000 ,..............„......... �i7�Til� ` • 60/300 \ 60 0/360 50 -30 / 330 30 100 -60 / 300 60 -90 / 270 - 90 4111k -90 / 270 90 -120 / 240 120 -120 / 240 120 glir 200 -150 / 210 150 -150 / 210 150 50 -180 / 180 300 -1801 180 Travelling Cylinder Azimuth (TFO +AZI) [ °] vs Centre to Centre Separation [25 ft/in] ..-- Project: Western North Slope �OnOCOP� II��Ips Site: CD4 Nanuq Pad CD4 25wnO6 Well: Plan: CD4 -25 n: CD4 -25 f" Wellbore: Plan: Quarter Mile View HALLIBURTON CD4- 25wpos Sperry Drilling - - - 4 it�� N O&Al 4 C GO /11G^' CD'¢ ✓ G Va G . �. CD4 31 9 R . 111 1111.111111111 111 = CD4 -318A 4 1 AU -2000 _ O 5�,. ; o m� ' ::: c) - 4000 -° / ; ! Ai 1 Vi I z -6000 , i 10.--- \w 1 -•- • 11 L GV O CO -8000 , A , , ,,,,,, , . , G9_.- , ,ath -10000 '- 1 P 1- 1 1 -16000 -14000 -12000 -10000 -8000 -6000 -4000 -2000 0 West( -) /East( +) (2000 ft/in) Operator. C9999091911ps(Almk99k1c. 49S GriCorrecta -0.94 ° lo0NO'. ON /A Re42 Western North Sbpe BAn)seIc Swint. 2129 ° AR No eN /A Wei 004- 25w1906 05> : 5065 ° API No eN /A Rig eN /A 0o{Pegper 100 N System CVO) Reference: rnemSenlevel Snr.e Locdbn Original VS Plane: 331.00 Poem wel PIOO:CD4 -25 151774131 tt View VS Plane: 331.00 ° RRB Height. 5530 5 595716134 '1 Unk System API Based: WS Sedlon (V S) Reference: Slot Comments: POOL: o 0 0 S o a o o S o o S o S o S Q -°O O O P O �N O� Q O -°O O m P CD4- 25wp06 Plan: 16196' to 24332.03' MD 5962000 CD4 -321: 7485' to 7570' TVDss _ -- — 5961000 CD4 -26: 16339' to 24749' MD ` F' 1 5960000 CD4 -05: 15000' to 21142' MD CD4 -17: 12975' to 17975' MD 5959000 - 5958000 — , _ _ -- 5957000 g , i► 1 � 5956000 • —.— �� -� _ � — - 59 5954000 Ili 5953000 T :::: w p06 Plan CD4 -321 CD4 -26 Section View r - 5952000 /' D4 - 1- I — 5951000 f — ■ -- — 5950000 } 5949000 - - - - Alk -- 5948000 - -- — 5947000 I � — 5946000 5945000 r a N East ( +) / West ( -1 O • t a o a - 0 2 U •U Vert icd Section d ong "View VS Plane' Combo Preeiew Page 1 of 1 (CD4- 25wp06 Toolbox)ds) 11/6/2009 10:28 AM Closest in POOL Closest Approach: Reference Well: CD4- 25wp06 Plan Offset Well: CD4 -05 Coords. - Coords. - ASP ASP 3-D ctr -ctr Meas. Incl. TRUE Subsea N( +) /S( -) View VS Meas. Incl. TRUE Subsea N( +) /S( -) View VS Distance. Depth Angle Azi. TVD E( +) /W(- (331) Comments Depth Angle Azi. TVD E( +) /W(- (331) Comments FOOL Mm PUUL Mm Distance (491.83 ft) Distance (491.83 ft: in POOL (16196 - in POOL (16196 - 24332.03 MD) to 24332.03 MD) to CD4-05 (15000 - CD4- 25wp06 Plan 491.83 24332.03 91.77 332.1 7486.93 5955183 1506643 3474.785 21142 MD) 14996.87 84.27 318.86 7487.15 5955666 1506548 4048.13 (15000 - 21142 MD) , Closest Approach: Reference Well: CD4- 25wp06 Plan Offset Well: CD4 -26 • Coords. - Coords. - ASP ASP 3-D ctr -ctr Meas. Incl. TRUE Subsea N( +) /S( -) View VS Meas. Incl. TRUE Subsea N( +) /S( -) View VS Distance. Depth Angle Azi. TVD E( +) /W(- (331) Comments Depth Angle Azi. TVD E( +) /W(- (331) Comments FOUL Min POOL Mm Distance (1958.32 Distance (1958.32 ft) in POOL (16196 ft) in POOL (16196 - 24332.03 MD) to - 24332.03 MD) to (16339 - CD4- 25wp06 Plan 1958.3 24332.03 91.77 332.1 7486.93 5955183 1506643 3474.785 24749 MD) 18608.61 91.16 341.45 7542.41 5954592 1504777 3825.49 (16339 - 24749 MD; Closest Approach: Reference Well: CD4- 25wp06 Plan Offset Well: CD4 -17 Coords. - Coords. - ASP ASP 3-D ctr -ctr Meas. Incl. TRUE Subsea N( +) /S( -) View VS Meas. Incl. TRUE Subsea N( +) /S( -) View VS Distance. - Depth Angle Azi. TVD E( +) /W(- (331) Comments Depth , Angle Azi. TVD E( +) /W(- (331) Comments 1 Mm POOL Min Distance (2192.42 Distance (2192.42 ft) in POOL (16196 ft) in POOL (16196 - 24332.03 MD) to - 24332.03 MD) to CD4-17 (12975 - CD4- 25wp06 Plan 2192.4 24332.03 91.77 332.1 7486.93 5955183 1506643 3474.785 17975 MD) 12951.31 83.61 323.58 7415.34 5956683 1508241 4088.64 (12975 - 17975 MD) • ■ Closest Approach: Reference Well: CD4- 25wp06 Plan _Offset Well: CD4 -321 Coords. - Coords. - ASP ASP 3 -D ctr-ctr - - Meas. Incl. TRUE Subsea N( +) /S( -) View VS Meas. Incl. TRUE Subsea N( +) /S( -) View VS Distance. Depth Angle Azi. TVD E( +) /W(- (331) Comments Depth Angle Azi. TVD E( +) /W(- (331) Comments PV V L MIS POOL Mm Distance (5292.92 Distance (5292.92 ft) in POOL (16196 ft) in POOL (16196 - 24332.03 MD) to - 24332.03 MD) to CD4- 25wp06 Plan CD4 -321 (7485 - (7485 - 7570 5292.9 24332.03 91.77 332.1 7486.93 5955183 1506643 3474.785 7570 TVDss) 18935.67 52.63 256.27 7479.98 5953312 1501692 4155.46 TVDss) PoolSummaryl 11/6/2009 10:44 AM 0 0 CD4-25 Surface Location: rn, CPAI Coordinate Converter 1_11E1, ,rn...., - From: To: —1 Datum: rNAD83 ■ Region: Ialaska ..../.1 Datum: INAD 27 J Region: Ialaska J C Latitude/Lon 'Decimal Degrees C Latitude/Longitude 'Decimal Degrees 2L1 ✓ U TM Zone: 1 r South C UTM Zone: 1True r South ( State Plane Zone: 1 .1. Units: i p - s li — E' r State Plane Zone: 1 --- True .., Units: us - s :5" --- A C L Decopter; MAD 27 or liy) egal :i ane 4 4.. Legal Description (NAD27 only) r Starting Coordinates: Legal Description- ! X: filiiiiiii hi Townsp: r R oll FA Range: 1004 rE 1 Y: 15957161.34 Meridian: 1673„ Section:124 F11 . J 13002.0445 FL■3 1535.17831 [II'*] Quit I Help I CD4-25wp06 Intermediate Casing Point: r3, CPAI Coordinate Converter Lit J1 W From: 1 i To: 1 Datum: 1NAD 83 2 Region: Ialaska .1 1 Datum: 1NAD 27 z i Region: lalaska zi I , I ✓ Latitude/Longitude 1Decimal Degrees 2 j, r Latitude/Longitude 1Decimal Degrees .... ✓ UTM Zone: 1 r South C UTM Zone: 1True r South 1 State Plane Zone: F - - - A Units: Flii D r C State Plane Zone: mr" Units: 1 1 i r Leg ii i)e:rriptic i 1 I f4-D.7 only' 4 Legal Description (NAD27 only) ,-- Starting Coordinates: i r Legal Description X: 11510308.6 i Township: 1011 F. Range: 001 ri Y: 159479294 Meridian: 16 .J Section 135 L Fir3 11797.7270 Fl:D. 12538.3367 I I Transform I Quit I , Help I 0 0 REV DATE BY CK APP DESCRIPTION REV DATE BY CK APP DESCRIPTION 4 4/3/07 AG GD C.A. UPDATED PER K07041ACS 3 05/12/06 CZ DB C.A. UPDATED PER K06059ACS ALL CONDUCTORS ARE LOCATED IN PROTRACTED SEC.24, T 11 N, R 4 E, U.M. SEC.LINE 0/S EXIST. WELL 'Y' 'X' LAT.(N) LONG.(W) FSL FEL GND PAD CD4 -201 5,957,273.28 1,518,208.24 70' 17' 31.779" 150' 59' 22.030" 2397' 70' 12.4 19.0 CD4 -202 5,957,268.38 1,518,188.64 70' 17' 31.728" 150' 59' 22.599" 2392' 90' 12.4 19.6 CD4 -203 5,957,263.99 1,518,169.26 70° 17' 31.681" 150' 59' 23.162" 2387' 109' 12.4 19.6 CD4 -204 5,957,259.26 1,518,149.87 70° 17' 31.632" , 150' 59' 23.725" 2382' 128' 12.4 19.5 CD4 -205 5,957,254.43 1,518,130.28 70° 17' 31.581" 150° 59' 24.293" 2377' 148' 12.4 19.5 CD4 -206 5,957,249.76 1,518,110.87 70' 17' 31.532" 150° 59' 24.857" 2372' 167' 12.4 19.6 CD4 -207 5,957,245.29 1,518,091.49 70' 17' 31.485" 150' 59' 25.419" 2367' 186' 12.4 19.7 CD4 -208 5,957,240.13 1,518,071.80 70° 17' 31.431" 150' 59' 25.991" 2362' 206' 12.4 19.8 CD4 -209 5,957,235.77 1,518,052.15 70' 17' 31.385" 150° 59' 26.561" 2357' 226' 12.4 19.7 CD4 -210 5,957,230.92 1,518,032.98 70° 17' 31.334" 150° 59' 27.118" 2352' 245' 12.4 19.6 CD4 -211 5,957,226.94 1,518,013.75 70' 17' 31.292" 150° 59' 27.676" 2348' 264' 12.4 20.0 CD4 -212 5,957,222.25 1,517,994.40 70' 17' 31.243" 150° 59' 28.238" 2343' 283' 12.4 19.6 CD4 -213 5,957,217.19 1,517,974.60 70° 17' 31.190" 150° 59' 28.812" 2337' 303' 12.4 19.9 CD4 -214 5,957,212.46 1,517,955.51 70' 17' 31.140" 150' 59' 29.367" 2332' 322' 12.4 19.8 CD4 -215 5,957,208.07 1,517,935.87 70' 17' 31.094" 150' 59' 29.937" 2327' 341' 12.4 19.8 CD4 -216 5,957,203.17 1,517,916.63 70' 17' 31.043" 150' 59' 30.495" 2322' 361' 12.4 19.5 CD4 -217 5,957,198.80 1,517,897.14 70° 17' 30.997" 150° 59' 31.061" 2318' 380' 12.4 19.5 CD4 -318 5,957,193.71 1,517,877.38 70° 17' 30.944" 150° 59' 31.634" 2312' 400' 12.4 19.6 CD4 -319 5,957,189.64 1,517,857.90 70° 17' 30.900" 150' 59' 32.200" 2308' 419' 12.4 19.7 CD4 -320 5,957,185.03 1,517,838.65 70° 17' 30.852" 150° 59' 32.759" 2303' 438' 12.4 19.7 CD4 -321 5,957,180.22 1,517,819.26 70° 17' 30.802" 150° 59' 33.322" 2298' 458' 12.4 19.0 CD4 -X22 5,957,175.24 1,517,799.90 70° 17' 30.749" 150' 59' 33.884" 2292' 477' 12.4 19.0 CD4 -X23 5,957,170.76 1,517,780.38 70° 17' 30.702" 150° 59' 34.450" 2288' 496' 12.4 19.0 CD4 -X24 5,957,166.23 1,517,760.82 70° 17' 30.655" 150° 59' 35.018" 2283' 516' 12.4 19.0 CD4 -X25 5.957.161.34 1.517.741.31 70° 17' 30.603" 150' 59' 35.58" 2278' ' 535' 12.4 19,0 CD4 -X26 5,957,157.10 1,517,721.97 70' 17' 30.558" 150' 59' 36.146' 2273' 554' 12.4 19.5 CD4 -227 5,957,151.94 1,517,702.56 70' 17' 30.505" 150' 59' 36.709" 2268' 574' 12.4 19.6 NOTES: (i 1 . COORDINATES SHOWN HEREON ARE ALASKA STATE PLANE, ZONE 4, INAD 831 •-- KUUKPIK ' ■ 2. ELEVATIONS SHOWN ARE BRITISH PETROLEUM MEAN SEA LEVEL (B.P.M.S.L.) A l pi ne Survey O f f ice ALPINE MODULE: CD40 UNIT: CD C.noc.Phillips ALPINE PROJECT CD-4 WELL CONDUCTORS Alaska, Inc. AS -BUILT LOCATIONS CADD FILE NO. DRAWING NO: PART: REV: 05- 03- 03 -1B -2 10/11/05 CE -CD40 -121 2 OF 3 4 Page 1 of 1 • Schwartz, Guy L (DOA) From: Winfree, Michael Alex (Jr.) [ Michael .A.Winfree @conocophillips.com] Sent: Monday, November 23, 2009 10:56 AM To: Schwartz, Guy L (DOA) Subject: RE: CD4 -25 (PTD 209 -150) Guy, Per our conversation on the CD4 -25 PTD, after we run and cement the 7 -5/8" casing we will test it to 3,500psi. Please let me know if you have any more questions regarding the CD4 -25 PTD. I will be in the office through Wednesday. -Mike Mike A. Winfree 90 7.265.6820 From: Schwartz, Guy L (DOA) [ mailto:guy.schwartz @alaska.gov] Sent: Monday, November 23, 2009 10:37 AM To: Winfree, Michael Alex (Jr.) Subject: CD4 -25 (PTD 209 -150) Mike, I am reviewing your CD4 -25 PTD. On step 10 you didn't mention testing the 7 5/8" casing. I assume you are testing to 3500 psi.. Can you verify this. Give me a call ... been a while since we chatted anyway!! Guy Guy Schwartz Petroleum Engineer AOGCC 793 -1226 (office) 444 -3433 (cell) 11/23/2009 • TRANSMITTAL LETTER CHECKLIST WELL NAME Colville River Unit CD4 -25 PTD# 2091500 X Development Service Exploratory Stratigraphic Test Non - Conventional Well FIELD: Colville River POOL: Colville River, Alpine Oil Pool Circle Appropriate Letter / Paragraphs to be Included in Transmittal Letter CHECK ADD -ONS WHAT (OPTIONS) TEXT FOR APPROVAL LETTER APPLIES MULTI LATERAL The permit is for a new wellbore segment of existing well , Permit No. (If last two digits in API No. . Production should continue to be API number are reported as a function of the original API number stated above. between 60 -69) PILOT HOLE In accordance with 20 AAC 25.005(f), all records, data and logs acquired for the pilot hole must be clearly differentiated in both well name ( PH) and API number (50- - - ) from records, data and logs acquired for well SPACING The permit is approved subject to full compliance with 20 AAC EXCEPTION 25.055. Approval to perforate and produce / inject is contingent upon issuance of a conservation order approving a spacing exception. assumes the liability of any protest to the spacing exception that may occur. DRY DITCH All dry ditch sample sets submitted to the Commission must be in SAMPLE no greater than 30' sample intervals from below the permafrost or from where samples are first caught and 10' sample intervals through target zones. Non - Conventional Please note the following special condition of this permit: Well production or production testing of coal bed methane is not allowed for (name of well) until after (Company Name) has designed and implemented a water well testing program to provide baseline data on water quality and quantity. (Company Name) must contact the Commission to obtain advance approval of such water well testing program. Rev: 1/11/2008 - ; - :.; . Field & Pool COLVILLE RIVER, ALPINE OIL - 120100 Well Name: COLVILLE RIV UNIT CD4 -25 Program DEV Well bore seg ❑ PTD #:2091500 Company CONOCOPHILLIPS ALASKA INC Initial Class/Type DEV / PEND GeoArea 890 Unit 50360 On /Off Shore On Annular Disposal ❑ Administration 1 Permit fee attached NA 2 Lease number appropriate Yes Surface location in ADL 380077; wellbore passes through ADL 384209; top prod interval in 3 Unique well name and number Yes ADL 388902; productive interval open in ADL 380077 and 387209; TD in ADL 387208. 14 Well located in a defined pool Yes COLVILLE RIVER, ALPINE OIL - 120100, governed by CO 443B. 5 Well located proper distance from drilling unit boundary Yes Conforms to spacing requirements of Rule 3, CO 443B: > 500' from exterior boundary. 6 Well located proper distance from other wells Yes CO No. 443B contains no spacing restrictions with respect to drilling unit boundaries. 7 Sufficient acreage available in drilling unit Yes CO No. 443B has no interwell spacing restrictions. 8 If deviated, is wellbore plat included Yes CO No. 443B has no interwell spacing restrictions. Wellbore will be more than 500' 9 Operator only affected party Yes from an external property line where ownership or landownership changes. ! 10 Operator has appropriate bond in force Yes 11 Permit can be issued without conservation order Yes Appr Date 12 Permit can be issued without administrative approval Yes 13 Can permit be approved before 15 -day wait Yes SFD 11/19/2009 1 14 Well located within area and strata authorized by Injection Order # (put 10# in comments) (For NA • 15 All wells within 1/4 mile area of review identified (For service well only) NA 16 Pre- produced injector: duration of pre production less than 3 months (For service well only) NA 17 Nonconven. gas conforms to AS31.05.030(j.1.A),(j.2.A -D) NA 118 Conductor string provided Yes Engineering 19 Surface casing protects all known USDWs NA No Aquifers 20 CMT vol adequate to circulate on conductor & surf csg Yes 21 CMT vol adequate to tie -in long string to surf csg No Qannik to be cemented in 2nd stage. 22 CMT will cover all known productive horizons Intermediate casing cemented ... slotted liner completion. 23 Casing designs adequate for C, T, B & permafrost Yes 24 Adequate tankage or reserve pit Yes Rig equipped with steel pits. All waste to approved disposal wells. 25 If a re- drill, has a 10 -403 for abandonment been approved NA 26 Adequate wellbore separation proposed Yes Proximity analysis performed. Nearest well is CD4 -26 at 19' ctr ctr (300' md) 27 If diverter required, does it meet regulations NA Diverter waiver requested. No shallow gas issues in CRU. 20 AAC 25.035 (h)(2) Appr Date 28 Drilling fluid program schematic & equip list adequate Yes Max Formation pressure = 3432 psi ( 8.66 ppg) will drill with 9.6 ppg mud. GLS 11/23/2009 29 BOPEs, do they meet regulation Yes 130 BOPE press rating appropriate; test to (put psig in comments) Yes MASP =2670 psi Will test BOPs to 3500 psi 31 Choke manifold complies w /API RP -53 (May 84) Yes 32 Work will occur without operation shutdown Yes 33 Is presence of H2S gas probable No H2S not anticipated on the well. 134 Mechanical condition of wells within AOR verified (For service well only) NA 35 Permit can be issued w/o hydrogen sulfide measures Yes H2S not expected; however, rig will be equipped with operational sensors. Geology 36 Data presented on potential overpressure zones Yes Expected reservoir pressure is 8.7 ppg EMW; will be drilled with 9.2 ppg mud. Appr Date b7 Seismic analysis of shallow gas zones NA SFD 11/19/2009 38 Seabed condition survey -(if off-shore) NA 39 Contact name /phone for weekly progress reports [exploratory only] NA Geologic Engineering Date: - Date Date Commissioner: Come er: drf ■ ." /1-0S---af • Well History File APPENDI Information of detailed nature that is not particularly germane to the Well Permitting Process but is part of the history file. To improve the readability of the Well History file and to simplify finding information, information of this nature is accumulated at the end of the file under APPENDIX. No special effort has been made to chronologically organize this category of information. • Sperry -Sun Drilling Services LIS Scan Utility $Revision: 3 $ LisLib $Revision: 4 $ Thu Nov 11 14:35:57 2010 Reel Header Service name LISTPE Date 10/11/11 Origin STS Reel Name UNKNOWN Continuation Number 01 Previous Reel Name UNKNOWN Comments STS LIS Writing Library. Scientific Technical Services Tape Header Service name LISTPE Date 10/11/11 Origin STS Tape Name UNKNOWN Continuation Number 01 Previous Tape Name UNKNOWN Comments STS LIS Writing Library. Scientific Technical Services Physical EOF Comment Record TAPE HEADER Colville River MWD /MAD LOGS WELL NAME: CD4 -25 PB1 API NUMBER: 501032060870 OPERATOR: ConocoPhillips Alaska, Inc. LOGGING COMPANY: Sperry Sun TAPE CREATION DATE: 09- NOV -10 JOB DATA MWD RUN 3 JOB NUMBER: MW- 000736477 LOGGING ENGINEER: JESSE BOBBIT OPERATOR WITNESS: SCOTT HEIM SURFACE LOCATION SECTION: 24 TOWNSHIP: 11N RANGE: 4E FNL: FSL: 2278 FEL: 535 FWL: ELEVATION (FT FROM MSL 0) KELLY BUSHING: .00 DERRICK FLOOR: 55.40 GROUND LEVEL: 19.00 ,409 -66 020419'4 • WELL CASING RECORD OPEN HOLE CASING DRILLERS BIT SIZE (IN) SIZE (IN) DEPTH (FT) 1ST STRING 9.875 10.750 2958.0 2ND STRING 3RD STRING PRODUCTION STRING REMARKS: 1. ALL DEPTHS ARE BIT DEPTHS UNLESS OTHERWISE NOTED. THESE DEPTHS ARE MEASURED DEPTH (MD). 2. ALL VERTICAL DEPTHS ARE TRUE VERTICAL DEPTH (TVD). 3. MWD RUN 1 COMPRISED DIRECTIONAL AND AT -BIT INCLINATION (ABI), DRILLSTRIG DYNAMICS SENSOR (DDSr), UTILZING ELECTROMAGNETIC WAVE TELEMETRY (EM) - NO DATA ARE PRESENTED. 4. MWD RUN 2 NO FOOTAGE DRILLED - NO DATA ARE PRESENTED. 5. MWD RUNS 2 -3 COMPRISED DIRECTIONAL, DUAL GAMMA RAY (DGR) UTILIZING GEIGER - MUELLER TUBE DETECTORS, ELECTROMAGNETIC WAVE RESISTIVITY PHASE -4 (EWR- Phase4), AZIMUTHAL LITHO - DENSITY (ALD), COMPENSATED THERMAL NEUTRON POROSITY (CTN), DRILLSTRING DYNAMICS SENSOR (DDSr), PRESSURE WHILE DRILLING (PWD), BI -MODAL ACOUSTIC (BAT), AT -BIT GAMMA (ABG) RUN BEHIND A GEOPILOT ROTARY - STEERABLE BHA (GP) . 6. GAMMA RAY DATA FROM 15961' MD, 7467' TVD TO 16011' MD, 7473' TVD ACQUIRED BY THE AT -BIT GAMMA SENSOR WAS SPICED ONTO THE BOTTOM OF THE GAMMA RAY DATA ACQUIRED BY THE DUAL GAMMA RAY SENSOR. 7. MWD DATA ARE CONSIDERED PDC PER DISCUSSION OF ALPINE LOGGING REQUIRE- MENTS AT CONOCO- PHILLIPS /VENDOR MEETING HELD ON 26 SEPTEMBER 2001. DOUG KNOCK (CPAI) CONFIRMED THAT THIS WOULD ALSO BE THE CASE FOR THE DRILL SITES 3 AND 4 WELLS IN A PHONE CONVERSATION WITH BUSTER BRYANT (SDS) ON 27 APRIL 2005. 8. MWD RUN 3 REPRESENTS WELL CD4 -25PB1 WITH API #: 50- 103 - 20608 -70. THIS WELL REACHED A TOTAL DEPTH (TD) OF 16015'MD, 7473'TVD. MNEMONIC CURVE DESCRIPTION SEXP gin Phase Resistivity SESP 15in Phase Resistivity SEMP 27in Phase Resistivity SEDP 39in Phase Resistivity SFXE EWR Formation Exp Time SROP Avg Rate of Penetration SGRC DGR Combined Gamma Ray • SNP2 ALD LCRB Pe Factor SBD2 ALD LCRB Comp Density SCO2 ALD LCRB Den Correction TNPS CTN Porosity Sandstone CTFA CTN Far Avg Count Rate CTNA CTN Near Avg Count Rate DTCP BAT Comp Slowness DTSP BAT Comb Shear Slowness VPVS BAT VP /VS Ratio PARAMETERS USED IN POROSITY LOG PROCESSING: HOLE SIZE: FIXED 9.875" MUD WEIGHT: 9.6 - 11.0 PPG MUD SALINITY: 300 -700 PPM CL FORMATION WATER SALINITY: 23000 PPM CL FLUID DENSITY: 1.0 G /CC MATRIX DENSITY: 2.65 G /CC LITHOLOGY: SANDSTONE ALL DATA CURVES ARE SMOOTHED TO A STEP OF 0.5 FT, WITH A WINDOW OF 0.6 FT, EXCEPT FOR SROP AND SGRC. THESE CURVES ARE SMOOTHED WITH A 1.1 FT WINDOW. EXCEPT FOR DTCP, DTSP, VPVS. THESE CURVES ARE SMOOTHED WITH A 2.0 FT WINDOW. GAP FILL IS SET TO 5 FT FOR ALL CURVES. File Header Service name STSLIB.001 Service Sub Level Name Version Number 1 0 0 Date of Generation 10 /11 /11 Maximum Physical Record 65535 File Type LO Previous File Name STSLIB.000 Comment Record FILE HEADER FILE NUMBER: 1 EDITED MERGED MWD Depth shifted and clipped curves; all bit runs merged. DEPTH INCREMENT: .5000 FILE SUMMARY PBU TOOL CODE START DEPTH STOP DEPTH RPM 2948.0 15975.0 RPD 2948.0 15975.0 RPS 2948.0 15975.0 GR 2948.0 16011.0 RPX 2948.0 15975.0 FET 2948.0 15975.0 RHOB 2948.5 15937.5 FCNT 2948.5 15924.0 CALN 2948.5 15937.5 DRHO 2948.5 15937.5 PEF 2948.5 15937.5 NCNT 2948.5 15924.0 NPHI 2948.5 15924.0 ROP 2968.0 16015.0 DTC 2986.0 15898.5 SCRA 3812.0 15898.5 410 411 DTSH 3812.0 15898.5 $ BASELINE CURVE FOR SHIFTS: CURVE SHIFT DATA (MEASURED DEPTH) EQUIVALENT UNSHIFTED DEPTH BASELINE DEPTH $ # MERGED DATA SOURCE PBU TOOL CODE BIT RUN NO MERGE TOP MERGE BASE MWD 3 2948.0 16015.0 $ # REMARKS: MERGED MAIN PASS. $ Data Format Specification Record Data Record Type 0 Data Specification Block Type 0 Logging Direction Down Optical log depth units Feet Data Reference Point Undefined Frame Spacing 60 .1IN Max frames per record Undefined Absent value - 999 Depth Units Datum Specification Block sub- type...0 Name Service Order Units Size Nsam Rep Code Offset Channel DEPT FT 4 1 68 0 1 FCNT MWD CP30 4 1 68 4 2 NCNT MWD CP30 4 1 68 8 3 DTC MWD USPF 4 1 68 12 4 DTSH MWD USPF 4 1 68 16 5 CALN MWD IN 4 1 68 20 6 RHOB MWD G /CC 4 1 68 24 7 DRHO MWD G /CC 4 1 68 28 8 RPD MWD OHMM 4 1 68 32 9 RPM MWD OHMM 4 1 68 36 10 RPS MWD OHMM 4 1 68 40 11 RPX MWD OHMM 4 1 68 44 12 FET MWD HR 4 1 68 48 13 GR MWD API 4 1 68 52 14 PEF MWD B/E 4 1 68 56 15 ROP MWD FPH 4 1 68 60 16 NPHI MWD PU 4 1 68 64 17 SCRA MWD NONE 4 1 68 68 18 First Last Name Service Unit Min Max Mean Nsam Reading Reading DEPT FT 2948 16015 9481.5 26135 2948 16015 FCNT MWD CP30 560.2 2211.55 1040.5 25952 2948.5 15924 NCNT MWD CP30 121613 184705 153748 25952 2948.5 15924 4 10 11, DTC MWD USPF 64.38 141.82 91.4136 25826 2986 15898.5 DTSH MWD USPF 112.38 292.76 181.917 24174 3812 15898.5 CALN MWD IN 8.25 16.03 9.59703 25979 2948.5 15937.5 RHOB MWD G /CC 0.562 3.269 2.42887 25979 2948.5 15937.5 DRHO MWD G /CC -2.407 0.231 0.0281748 25979 2948.5 15937.5 RPD MWD OHMM 0.65 2000 10.6917 26055 2948 15975 RPM MWD OHMM 0.46 2000 7.93446 26055 2948 15975 RPS MWD OHMM 0.79 1191.54 6.81012 26055 2948 15975 RPX MWD OHMM 0.96 1756.26 6.4679 26055 2948 15975 FET MWD HR 0.15 80.04 0.564717 26055 2948 15975 GR MWD API 44.13 366.53 113.157 26127 2948 16011 PEF MWD B/E 1.75 14.23 2.97186 25979 2948.5 15937.5 ROP MWD FPH 0.25 320.44 189.316 26095 2968 16015 NPHI MWD PU 11.6 57.31 27.9404 25952 2948.5 15924 SCRA MWD NONE 1.52 2.73 2.02326 24174 3812 15898.5 2 48 Reading 9 First g For Entire File Last Reading For Entire File 16015 File Trailer Service name STSLIB.001 Service Sub Level Name Version Number 1 0 0 Date of Generation 10/11/11 Maximum Physical Record 65535 File Type LO Next File Name STSLIB.002 Physical EOF File Header Service name STSLIB.002 Service Sub Level Name Version Number 1 0 0 Date of Generation 10/11/11 Maximum Physical Record 65535 File Type LO Previous File Name STSLIB.001 Comment Record FILE HEADER FILE NUMBER: 2 . RAW MWD Curves and log header data for each bit run in separate files. BIT RUN NUMBER: 3 DEPTH INCREMENT: .5000 FILE SUMMARY VENDOR TOOL CODE START DEPTH STOP DEPTH SESP 2948.0 15975.0 SEMP 2948.0 15975.0 SEDP 2948.0 15975.0 SEXP 2948.0 15975.0 SFXE 2948.0 15975.0 SGRC 2948.0 16011.0 SNP2 2948.5 15937.5 TNPS 2948.5 15924.0 CTNA 2948.5 15924.0 SCO2 2948.5 15937.5 SBD2 2948.5 15937.5 CTFA 2948.5 15924.0 AHSI 2948.5 15937.5 SROP 2968.0 16015.0 DTCP 2986.0 15898.5 DTSP 3812.0 15898.5 VPVS 3812.0 15898.5 LOG HEADER DATA DATE LOGGED: 19- SEP -10 SOFTWARE SURFACE SOFTWARE VERSION: Insite DOWNHOLE SOFTWARE VERSION: 88.2 DATA TYPE (MEMORY OR REAL - TIME): Memory TD DRILLER (FT): 16015.0 TOP LOG INTERVAL (FT): 2968.0 BOTTOM LOG INTERVAL (FT): 16015.0 BIT ROTATING SPEED (RPM): HOLE INCLINATION (DEG MINIMUM ANGLE: 60.7 MAXIMUM ANGLE: 82.8 TOOL STRING (TOP TO BOTTOM) VENDOR TOOL CODE TOOL TYPE TOOL NUMBER DGR Dual Gamma Ray 10718520 EWR4 EWR Phase -4 96540 CTN Comp Thermal Neutron 244601 ALD Azimuthal Litho Dens 146098 BAT Bi -Modal Acoustic 11209169 BOREHOLE AND CASING DATA OPEN HOLE BIT SIZE (IN): 9.875 DRILLER'S CASING DEPTH (FT): 2958.0 BOREHOLE CONDITIONS MUD TYPE: Fresh Water Gel MUD DENSITY (LB /G): 11.00 MUD VISCOSITY (S): 40.0 MUD PH: 9.3 MUD CHLORIDES (PPM): 800 FLUID LOSS (C3): 4.0 RESISTIVITY (OHMM) AT TEMPERATURE (DEGF) Alt 410 VP MUD AT MEASURED TEMPERATURE (MT): 1.970 80.0 MUD AT MAX CIRCULATING TERMPERATURE: .974 169.7 MUD FILTRATE AT MT: 1.940 78.0 MUD CAKE AT MT: 1.990 74.0 NEUTRON TOOL MATRIX: MATRIX DENSITY: HOLE CORRECTION (IN): # TOOL STANDOFF (IN): EWR FREQUENCY (HZ): REMARKS: $ Data Format Specification Record Data Record Type 0 Data Specification Block Type 0 Logging Direction Down Optical log depth units Feet Data Reference Point Undefined Frame Spacing 60 .1IN Max frames per record Undefined Absent value - 999 Depth Units Datum Specification Block sub- type...0 Name Service Order Units Size Nsam Rep Code Offset Channel DEPT FT 4 1 68 0 1 FCNT MWD030 CP30 4 1 68 4 2 NCNT MWD030 CP30 4 1 68 8 3 DTC MWD030 USPF 4 1 68 12 4 DTSH MWD030 USPF 4 1 68 16 5 CALN MWD030 IN 4 1 68 20 6 RHOB MWD030 G /CC 4 1 68 24 7 DRHO MWD030 G /CC 4 1 68 28 8 RPD MWD030 OHMM 4 1 68 32 9 RPM MWD030 OHMM 4 1 68 36 10 RPS MWD030 OHMM 4 1 68 40 11 RPX MWD030 OHMM 4 1 68 44 12 FET MWD030 HR 4 1 68 48 13 GR MWD030 API 4 1 68 52 14 PEF MWD030 B/E 4 1 68 56 15 ROP MWD030 FPH 4 1 68 60 16 NPHI MWD030 PU 4 1 68 64 17 SCRA MWD030 NONE 4 1 68 68 18 First Last Name Service Unit Min Max Mean Nsam Reading Reading DEPT FT 2948 16015 9481.5 26135 2948 16015 FCNT MWD030 CP30 560.2 2211.55 1040.5 25952 2948.5 15924 NCNT MWD030 CP30 121613 184705 153748 25952 2948.5 15924 DTC MWD030 USPF 64.38 141.82 91.4136 25826 2986 4110 411 15898.5 DTSH MWD030 USPF 112.38 292.76 181.917 24174 3812 15898.5 CALN MWD030 IN 8.25 16.03 9.59703 25979 2948.5 15937.5 RHOB MWD030 G /CC 0.562 3.269 2.42887 25979 2948.5 15937.5 DRHO MWD030 G /CC -2.407 0.231 0.0281748 25979 2948.5 15937.5 RPD MWD030 OHMM 0.65 2000 10.6917 26055 2948 15975 RPM MWD030 OHMM 0.46 2000 7.93446 26055 2948 15975 RPS MWD030 OHMM 0.79 1191.54 6.81012 26055 2948 15975 RPX MWD030 OHMM 0.96 1756.26 6.4679 26055 2948 15975 FET MWD030 HR 0.15 80.04 0.564717 26055 2948 15975 GR MWD030 API 44.13 366.53 113.157 26127 2948 16011 PEF MWD030 B/E 1.75 14.23 2.97186 25979 2948.5 15937.5 ROP MWD030 FPH 0.25 320.44 189.316 26095 2968 16015 NPHI MWD030 PU 11.6 57.31 27.9404 25952 2948.5 15924 SCRA MWD030 NONE 1.52 2.73 2.02326 24174 3812 15898.5 First Reading For Entire File 2948 Last Reading For Entire File 16015 File Trailer Service name STSLIB.002 Service Sub Level Name Version Number 1 0 0 Date of Generation 10/11/11 Maximum Physical Record 65535 File Type LO Next File Name STSLIB.003 Physical EOF Tape Trailer Service name LISTPE Date 10 /11 /11 Origin STS Tape Name UNKNOWN Continuation Number 01 Next Tape Name UNKNOWN Comments STS LIS Writing Library. Scientific Technical Services Reel Trailer Service name LISTPE Date 10 /11 /11 41, 411 Origin STS Reel Name UNKNOWN Continuation Number 01 Next Reel Name UNKNOWN Comments STS LIS Writing Library. Scientific Technical Services Physical EOF Physical EOF End Of LIS File Sperry -Sun Drilling Services LIS Scan Utility $Revision: 3 $ LisLib $Revision: 4 $ Wed Nov 10 09:36:36 2010 Reel Header Service name LISTPE Date 10/11/10 Origin STS Reel Name UNKNOWN Continuation Number 01 Previous Reel Name UNKNOWN Comments STS LIS Writing Library. Scientific Technical Services Tape Header Service name LISTPE Date 10/11/10 Origin STS Tape Name UNKNOWN Continuation Number 01 Previous Tape Name UNKNOWN Comments STS LIS Writing Library. Scientific Technical Services Physical EOF Comment Record TAPE HEADER Colville River MWD /MAD LOGS WELL NAME: CD4 -25 API NUMBER: 501032060800 OPERATOR: ConocoPhillips Alaska, Inc. LOGGING COMPANY: Sperry Sun TAPE CREATION DATE: 09- NOV -10 JOB DATA MWD RUN 3 MWD RUN 5 MWD RUN 6 JOB NUMBER: K -MW- 000736477 K -MW- 000736477 K -MW- 000736477 LOGGING ENGINEER: JESSE BOBBIT PAUL ORTH PAUL ORTH OPERATOR WITNESS: SCOTT HEIM DAVE BURLEY DAVE BURLEY MWD RUN 8 JOB NUMBER: K -MW- 000736477 LOGGING ENGINEER: JESSE BOBBIT OPERATOR WITNESS: DAVE BURLEY SURFACE LOCATION SECTION: 24 TOWNSHIP: 11N RANGE: 4E FNL: FSL: 2278 ag - ?-y 411 411 FEL: 535 FWL: ELEVATION (FT FROM MSL 0) KELLY BUSHING: .00 DERRICK FLOOR: 55.40 GROUND LEVEL: 19.00 WELL CASING RECORD OPEN HOLE CASING DRILLERS BIT SIZE (IN) SIZE (IN) DEPTH (FT) 1ST STRING 9.875 10.750 2958.0 2ND STRING 6.750 7.625 16784.0 3RD STRING PRODUCTION STRING REMARKS: 1. ALL DEPTHS ARE BIT DEPTHS UNLESS OTHERWISE NOTED. THESE DEPTHS ARE MEASURED DEPTH (MD). 2. ALL VERTICAL DEPTHS ARE TRUE VERTICAL DEPTH (TVD). 3. MWD RUN 1 COMPRISED DIRECTIONAL AND AT -BIT INCLINATION (ABI), DRILLSTRIG DYNAMICS SENSOR (DDSr), UTILZING ELECTROMAGNETIC WAVE TELEMETRY (EM) - NO DATA ARE PRESENTED. 4. MWD RUN 2 NO FOOTAGE DRILLED - NO DATA ARE PRESENTED. 5. MWD RUNS 2 -3 COMPRISED DIRECTIONAL, DUAL GAMMA RAY (DGR) UTILIZING GEIGER - MUELLER TUBE DETECTORS, ELECTROMAGNETIC WAVE RESISTIVITY PHASE -4 (EWR- Phase4), AZIMUTHAL LITHO- DENSITY (ALD), COMPENSATED THERMAL NEUTRON POROSITY (CTN), DRILLSTRING DYNAMICS SENSOR (DDSr), PRESSURE WHILE DRILLING (PWD), BI -MODAL ACOUSTIC (BAT), AT -BIT GAMMA (ABG) RUN BEHIND A GEOPILOT ROTARY - STEERABLE BHA (GP) . 6. MWD RUN 4 UNABLE TO GET TO BOTTOM - NO DATA PRESENTED. 7. CD4 -25 EXITS CD4 -25PB1 FROM AN OPENHOLE SIDETRACK AT 13205' MD, 6745' TVD DURING MWD RUN 5. 8. MWD RUN 5 COMPRISED DIRECTIONAL, DUAL GAMMA RAY (DGR) UTILIZING GEIGER - MUELLER TUBE DETECTORS, ELECTROMAGNETIC WAVE RESISTIVITY PHASE -4 (EWR- Phase4), AZIMUTHAL LITHO- DENSITY (ALD), COMPENSATED THERMAL NEUTRON POROSITY (CTN), DRILLSTRING DYNAMICS SENSOR (DDSr), PRESSURE WHILE DRILLING (PWD), AND BI -MODAL ACOUSTIC (BAT)RUN BEHIND A PERFORMANCE DRILL MOTOER (PDM). NOTE ONLY RESISTIVITY AND RATE OF PENETRATION DATA ARE PRESENTED FOR THIS RUN. 9. MWD RUNS 6 COMPRISED DIRECTIONAL, DUAL GAMMA RAY (DGR) UTILIZING GEIGER - MUELLER TUBE DETECTORS, ELECTROMAGNETIC WAVE RESISTIVITY PHASE -4 (EWR- Phase4), AZIMUTHAL LITHO- DENSITY (ALD), COMPENSATED THERMAL NEUTRON POROSITY (CTN), DRILLSTRING DYNAMICS SENSOR (DDSr), PRESSURE WHILE DRILLING (PWD), BI -MODAL ACOUSTIC (BAT), AT -BIT GAMMA (ABG) RUN BEHIND A GEOPILOT ROTARY - STEERABLE BHA (GP) . 10. PHOTOELECTRIC FACTOR DATA FROM MWD RUN 6 IS SHIFTED FROM MWD RUN 3 THIS APPEARS TO BE DUE TO THE INCREASED PRESENCE OF BARITE WEIGHTING MATERIAL. 11. MWD RUN 7 NO FOOTAGE DRILLED - NO DATA ARE PRESENTED. 12. GAMMA RAY DATA FROM 16746' MD, 7521' TVD TO 16796' MD, 7527' TVD ACQUIRED BY THE AT -BIT GAMMA SENSOR WAS SPICED ONTO THE BOTTOM OF THE GAMMA RAY DATA ACQUIRED BY THE DUAL GAMMA RAY SENSOR FOR MWD RUN 6. 13. MWD RUNS 8 COMPRISED DIRECTIONAL, DUAL GAMMA RAY (DGR) UTILIZING GEIGER - MUELLER TUBE DETECTORS, ELECTROMAGNETIC WAVE RESISTIVITY PHASE -4 (EWR- Phase4), DRILLSTRING DYNAMICS SENSOR (DDSr), AND PRESSURE WHILE DRILLING (PWD), RUN BEHIND A GEOPILOT ROTARY - STEERABLE BHA (GP). 14. MWD DATA ARE CONSIDERED PDC PER DISCUSSION OF ALPINE LOGGING REQUIRE- MENTS AT CONOCO- PHILLIPS /VENDOR MEETING HELD ON 26 SEPTEMBER 2001. DOUG KNOCK (CPAI) CONFIRMED THAT THIS WOULD ALSO BE THE CASE FOR THE DRILL SITES 3 AND 4 WELLS IN A PHONE CONVERSATION WITH BUSTER BRYANT (SDS) ON 27 APRIL 2005. 15. MWD RUNS 3,5 -6,8 REPRESENT WELL CD4 -25 WITH API #: 50- 103 - 20608 -00. THIS WELL REACHED A TOTAL DEPTH (TD) OF 21168'MD, 7576'TVD. MNEMONIC CURVE DESCRIPTION SEXP 9in Phase Resistivity SESP 15in Phase Resistivity SEMP 27in Phase Resistivity SEDP 39in Phase Resistivity SFXE EWR Formation Exp Time SROP Avg Rate of Penetration SGRC DGR Combined Gamma Ray SNP2 ALD LCRB Pe Factor SBD2 ALD LCRB Comp Density SCO2 ALD LCRB Den Correction TNPS CTN Porosity Sandstone CTFA CTN Far Avg Count Rate CTNA CTN Near Avg Count Rate DTCP BAT Comp Slowness DTSP BAT Comb Shear Slowness VPVS BAT VP /VS Ratio PARAMETERS USED IN POROSITY LOG PROCESSING: PARAMETER MWD RUN 3 MWD RUN 6 HOLE SIZE: FIXED 9.875" FIXED 9.875 MUD WEIGHT: 9.6 - 11.0 PPG 11.1 - 12.0 PPG MUD SALINITY: 300 -700 PPM CL 600 PPM CL FORMATION WATER SALINITY: 23000 PPM CL 23000 PPM CL FLUID DENSITY: 1.0 G /CC 1.0 G /CC MATRIX DENSITY: 2.65 G /CC 2.65 G /CC LITHOLOGY: SANDSTONE SANDSTONE ALL DATA CURVES ARE SMOOTHED TO A STEP OF 0.5 FT, WITH A WINDOW OF 0.6 FT, EXCEPT FOR SROP AND SGRC. THESE CURVES ARE SMOOTHED WITH A 1.1 FT WINDOW. EXCEPT FOR DTCP, DTSP, VPVS. THESE CURVES ARE SMOOTHED WITH A 2.0 FT WINDOW. GAP FILL IS SET TO 5 FT FOR ALL CURVES. File Header Service name STSLIB.001 Service Sub Level Name Version Number 1 0 0 Date of Generation 10 /11 /10 Maximum Physical Record 65535 File Type LO Previous File Name STSLIB.000 Comment Record FILE HEADER FILE NUMBER: 1 EDITED MERGED MWD Depth shifted and clipped curves; all bit runs merged. DEPTH INCREMENT: .5000 FILE SUMMARY PBU TOOL CODE START DEPTH STOP DEPTH RPS 2948.0 21126.5 FET 2948.0 21126.5 RPM 2948.0 21126.5 RPD 2948.0 21126.5 GR 2948.0 21119.5 RPX 2948.0 21126.5 CALN 2948.5 16723.0 NCNT 2948.5 16709.0 PEF 2948.5 16723.0 DRHO 2948.5 16723.0 NPHI 2948.5 16709.0 FCNT 2948.5 16709.0 RHOB 2948.5 16723.0 ROP 2968.0 21168.0 DTC 2986.0 16684.5 DTSH 3812.0 16684.5 SCRA 3812.0 16684.5 BASELINE CURVE FOR SHIFTS: CURVE SHIFT DATA (MEASURED DEPTH) EQUIVALENT UNSHIFTED DEPTH BASELINE DEPTH _ 1 0 # MERGED DATA SOURCE PBU TOOL CODE BIT RUN NO MERGE TOP MERGE BASE MWD 3 2948.0 13205.0 MWD 5 13205.0 13251.0 MWD 6 13251.0 16800.0 MWD 8 16800.0 21168.0 $ REMARKS: MERGED MAIN PASS. $ Data Format Specification Record Data Record Type 0 Data Specification Block Type 0 Logging Direction Down Optical log depth units Feet Data Reference Point Undefined Frame Spacing 60 .1IN Max frames per record Undefined Absent value -999 Depth Units Datum Specification Block sub- type...0 Name Service Order Units Size Nsam Rep Code Offset Channel DEPT FT 4 1 68 0 1 FCNT MWD CP30 4 1 68 4 2 NCNT MWD CP30 4 1 68 8 3 DTC MWD USPF 4 1 68 12 4 DTSH MWD USPF 4 1 68 16 5 CALN MWD IN 4 1 68 20 6 RHOB MWD G /CC 4 1 68 24 7 DRHO MWD G /CC 4 1 68 28 8 RPD MWD OHMM 4 1 68 32 9 RPM MWD OHMM 4 1 68 36 10 RPS MWD OHMM 4 1 68 40 11 RPX MWD OHMM 4 1 68 44 12 FET MWD HR 4 1 68 48 13 GR MWD API 4 1 68 52 14 PEF MWD B/E 4 1 68 56 15 ROP MWD FPH 4 1 68 60 16 NPHI MWD PU 4 1 68 64 17 SCRA MWD NONE 4 1 68 68 18 First Last Name Service Unit Min Max Mean Nsam Reading Reading DEPT FT 2948 21168 12058 36441 2948 21168 FCNT MWD CP30 560.2 2843.74 1038.91 27522 2948.5 16709 NCNT MWD CP30 121613 193189 152949 27522 2948.5 16709 DTC MWD USPF 64.98 141.82 90.5255 27398 2986 16684.5 DTSH MWD USPF 112.38 292.76 178.605 25746 3812 16684.5 CALN MWD IN 8.25 16.03 9.65613 27550 2948.5 16723 RHOB MWD G /CC 0.562 3.122 2.43208 27550 2948.5 16723 DRHO MWD G /CC -2.407 0.34 0.0401531 27550 2948.5 16723 RPD MWD OHMM 0.65 2000 10.8589 36332 2948 21126.5 RPM MWD OHMM 0.46 2000 9.11704 36332 2948 21126.5 RPS MWD OHMM 0.79 1191.54 7.98513 36332 2948 21126.5 RPX MWD OHMM 0.96 1756.26 7.80641 36332 2948 21126.5 FET MWD HR 0.15 373.13 1.2671 36332 2948 21126.5 GR MWD API 34.96 415.7 98.9898 36344 2948 21119.5 PEF MWD B/E 1.75 14.23 3.48365 27550 2948.5 16723 ROP MWD FPH 0.25 338.75 164.814 36401 2968 21168 NPHI MWD PU 8.83 57.31 28.0291 27522 2948.5 16709 SCRA MWD NONE 1.44 2.73 2.00251 25746 3812 16684.5 First Reading For Entire File 2948 Last Reading For Entire File 21168 File Trailer Service name STSLIB.001 Service Sub Level Name Version Number 1 0 0 Date of Generation 10 /11 /10 Maximum Physical Record 65535 File Type LO Next File Name STSLIB.002 Physical EOF File Header Service name STSLIB.002 Service Sub Level Name Version Number 1 0 0 Date of Generation 10 /11 /10 Maximum Physical Record 65535 File Type LO Previous File Name STSLIB.001 Comment Record FILE HEADER FILE NUMBER: 2 RAW MWD Curves and log header data for each bit run in separate files. BIT RUN NUMBER: 3 DEPTH INCREMENT: .5000 FILE SUMMARY VENDOR TOOL CODE START DEPTH STOP DEPTH SEDP 2948.0 13205.0 SGRC 2948.0 13205.0 SEXP 2948.0 13205.0 SESP 2948.0 13205.0 SFXE 2948.0 13205.0 SEMP 2948.0 13205.0 TNPS 2948.5 13204.5 SNP2 2948.5 13205.0 CTFA 2948.5 13204.5 SCO2 2948.5 13205.0 SBD2 2948.5 13205.0 CTNA 2948.5 13204.5 ANSI 2948.5 13205.0 SROP 2968.0 13205.0 DTCP 2986.0 13205.0 VPVS 3812.0 13205.0 DTSP 3812.0 13205.0 $ LOG HEADER DATA DATE LOGGED: 19- SEP -10 SOFTWARE SURFACE SOFTWARE VERSION: Insite DOWNHOLE SOFTWARE VERSION: 88.2 DATA TYPE (MEMORY OR REAL - TIME): Memory TD DRILLER (FT): 13205.0 TOP LOG INTERVAL (FT): 2968.0 BOTTOM LOG INTERVAL (FT): 13205.0 BIT ROTATING SPEED (RPM): HOLE INCLINATION (DEG MINIMUM ANGLE: 60.7 MAXIMUM ANGLE: 82.8 TOOL STRING (TOP TO BOTTOM) VENDOR TOOL CODE TOOL TYPE TOOL NUMBER DGR DUAL GAMMA RAY 10718520 EWR4 ELECTROMAG. RESIS. 4 96540 CTN COMP THERMAL NEUTRON 244601 ALD Azimuthal Litho -Dens 146098 BAT Bi -modal Acoustic 11209169 # BOREHOLE AND CASING DATA OPEN HOLE BIT SIZE (IN): 9.875 DRILLER'S CASING DEPTH (FT): 2958.0 BOREHOLE CONDITIONS MUD TYPE: Fresh Water Gel MUD DENSITY (LB /G): 11.00 MUD VISCOSITY (S): 40.0 MUD PH: 9.3 MUD CHLORIDES (PPM): 800 FLUID LOSS (C3): 4.0 RESISTIVITY (OHMM) AT TEMPERATURE (DEGF) MUD AT MEASURED TEMPERATURE (MT): 1.970 80.0 MUD AT MAX CIRCULATING TERMPERATURE: .974 169.7 MUD FILTRATE AT MT: 1.940 78.0 MUD CAKE AT MT: 1.990 74.0 II 111 411 NEUTRON TOOL MATRIX: MATRIX DENSITY: HOLE CORRECTION (IN): TOOL STANDOFF (IN): EWR FREQUENCY (HZ): REMARKS: $ # Data Format Specification Record Data Record Type 0 Data Specification Block Type 0 Logging Direction Down Optical log depth units Feet Data Reference Point Undefined Frame Spacing 60 .1IN Max frames per record Undefined Absent value - 999 Depth Units Datum Specification Block sub- type...0 Name Service Order Units Size Nsam Rep Code Offset Channel DEPT FT 4 1 68 0 1 FCNT MWD030 CP30 4 1 68 4 2 NCNT MWD030 CP30 4 1 68 8 3 DTC MWD030 USPF 4 1 68 12 4 DTSH MWD030 USPF 4 1 68 16 5 CALN MWD030 IN 4 1 68 20 6 RHOB MWD030 G /CC 4 1 68 24 7 DRHO MWD030 G /CC 4 1 68 28 8 RPD MWD030 OHMM 4 1 68 32 9 RPM MWD030 OHMM 4 1 68 36 10 RPS MWD030 OHMM 4 1 68 40 11 RPX MWD030 OHMM 4 1 68 44 12 FET MWD030 HR 4 1 68 48 13 GR MWD030 API 4 1 68 52 14 PEF MWD030 B/E 4 1 68 56 15 ROP MWD030 FPH 4 1 68 60 16 NPHI MWD030 PU 4 1 68 64 17 SCRA MWD030 NONE 4 1 68 68 18 First Last Name Service Unit Min Max Mean Nsam Reading Reading DEPT FT 2948 13205 8076.5 20515 2948 13205 FCNT MWD030 CP30 560.2 2211.55 1046.96 20513 2948.5 13204.5 NCNT MWD030 CP30 121613 184704 153976 20513 2948.5 13204.5 DTC MWD030 USPF 65.34 141.82 94.5578 20439 2986 13205 DTSH MWD030 USPF 112.38 292.76 192.028 18787 3812 13205 CALN MWD030 IN 8.25 16.03 9.59886 20514 2948.5 13205 RHOB MWD030 G /CC 0.562 2.707 2.41298 20514 2948.5 13205 DRHO MWD030 G /CC -2.407 0.231 0.0267997 20514 2948.5 13205 RPD MWD030 OHMM 0.65 2000 9.64376 20515 2948 13205 RPM MWD030 OHMM 0.46 477.34 6.90153 20515 2948 13205 RPS MWD030 OHMM 0.79 1191.54 6.87916 20515 2948 13205 RPX MWD030 OHMM 0.96 1756.26 6.68442 20515 2948 13205 FET MWD030 HR 0.15 80.04 0.576026 20515 2948 13205 GR MWD030 API 44.13 180.61 105.082 20515 2948 13205 PEF MWD030 B/E 1.75 14.23 2.7746 20514 2948.5 13205 ROP MWD030 FPH 0.25 320.44 203.696 20475 2968 13205 NPHI MWD030 PU 11.6 57.31 27.4512 20513 2948.5 13204.5 SCRA MWD030 NONE 1.64 2.73 2.07385 18787 3812 13205 First Reading For Entire File 2948 Last Reading For Entire File 13205 File Trailer Service name STSLIB.002 Service Sub Level Name Version Number 1 0 0 Date of Generation 10 /11 /10 Maximum Physical Record 65535 File Type LO Next File Name STSLIB.003 Physical EOF File Header Service name STSLIB.003 Service Sub Level Name Version Number 1 0 0 Date of Generation 10 /11 /10 Maximum Physical Record 65535 File Type LO Previous File Name STSLIB.002 Comment Record FILE HEADER FILE NUMBER: 3 RAW MWD Curves and log header data for each bit run in separate files. BIT RUN NUMBER: 5 DEPTH INCREMENT: .5000 FILE SUMMARY 411 411 VENDOR TOOL CODE START DEPTH STOP DEPTH SFXE 13205.5 13211.0 SEDP 13205.5 13211.0 SROP 13205.5 13250.5 SEMP 13205.5 13211.0 SEXP 13205.5 13211.0 SESP 13205.5 13211.0 ## LOG HEADER DATA DATE LOGGED: 26- SEP -10 SOFTWARE SURFACE SOFTWARE VERSION: Insite DOWNHOLE SOFTWARE VERSION: 88.2 DATA TYPE (MEMORY OR REAL- TIME): Memory TD DRILLER (FT): 13251.0 TOP LOG INTERVAL (FT): 13205.0 BOTTOM LOG INTERVAL (FT): 13251.0 BIT ROTATING SPEED (RPM): HOLE INCLINATION (DEG MINIMUM ANGLE: 68.3 MAXIMUM ANGLE: 68.3 TOOL STRING (TOP TO BOTTOM) VENDOR TOOL CODE TOOL TYPE TOOL NUMBER EWR4 ELECTROMAG. RESIS. 4 11241795 $ BOREHOLE AND CASING DATA OPEN HOLE BIT SIZE (IN): 9.875 DRILLER'S CASING DEPTH (FT): 2958.0 BOREHOLE CONDITIONS MUD TYPE: Fresh Water Gel MUD DENSITY (LB /G): 11.10 MUD VISCOSITY (S): 43.0 MUD PH: 9.6 MUD CHLORIDES (PPM): 600 FLUID LOSS (C3): 5.0 RESISTIVITY (OHMM) AT TEMPERATURE (DEGF) MUD AT MEASURED TEMPERATURE (MT): 2.200 68.0 MUD AT MAX CIRCULATING TERMPERATURE: 1.166 134.4 MUD FILTRATE AT MT: 1.800 68.0 MUD CAKE AT MT: 2.300 6.8 NEUTRON TOOL MATRIX: MATRIX DENSITY: HOLE CORRECTION (IN): TOOL STANDOFF (IN): EWR FREQUENCY (HZ): REMARKS: Data Format Specification Record Data Record Type 0 Data Specification Block Type 0 Logging Direction Down Optical log depth units Feet _ . Data Reference Point Undefined Frame Spacing 60 .1IN Max frames per record Undefined Absent value - 999 Depth Units Datum Specification Block sub- type...0 Name Service Order Units Size Nsam Rep Code Offset Channel DEPT FT 4 1 68 0 1 RPD MWD050 OHMM 4 1 68 4 2 RPM MWD050 OHMM 4 1 68 8 3 RPS MWD050 OHMM 4 1 68 12 4 RPX MWD050 OHMM 4 1 68 16 5 FET MWD050 HR 4 1 68 20 6 ROP MWD050 FPH 4 1 68 24 7 First Last Name Service Unit Min Max Mean Nsam Reading Reading DEPT FT 13205.5 13250.5 13228 91 13205.5 13250.5 RPD MWD050 OHMM 8.35 8.53 8.39333 12 13205.5 13211 RPM MWD050 OHMM 9.08 9.2 9.1325 12 13205.5 13211 RPS MWD050 OHMM 9.87 10.4 10.2167 12 13205.5 13211 RPX MWD050 OHMM 9.39 10.17 9.85417 12 13205.5 13211 FET MWD050 HR 1.57 197.51 28.1008 12 13205.5 13211 ROP MWD050 FPH 14.59 52.47 29.3616 91 13205.5 13250.5 First Reading For Entire File 13205.5 Last Reading For Entire File 13250.5 File Trailer Service name STSLIB.003 Service Sub Level Name Version Number 1 0 0 Date of Generation 10 /11 /10 Maximum Physical Record 65535 File Type LO 1 Next File Name STSLIB.004 Physical EOF File Header Service name STSLIB.004 Service Sub Level Name Version Number 1 0 0 Date of Generation 10/11/10 Maximum Physical Record 65535 410 411 File Type LO Previous File Name STSLIB.003 Comment Record FILE HEADER FILE NUMBER: 4 RAW MWD Curves and log header data for each bit run in separate files. BIT RUN NUMBER: 6 DEPTH INCREMENT: .5000 I # FILE SUMMARY VENDOR TOOL CODE START DEPTH STOP DEPTH SBD2 13205.5 16723.0 DTSP 13205.5 16684.5 AHSI 13205.5 16723.0 CTNA 13205.5 16709.0 TNPS 13205.5 16709.0 CTFA 13205.5 16709.0 SNP2 13205.5 16723.0 SGRC 13205.5 16796.0 SCO2 13205.5 16723.0 VPVS 13205.5 16684.5 DTCP 13205.5 16684.5 SEMP 13211.5 16760.5 SFXE 13211.5 16760.5 SEDP 13211.5 16760.5 SESP 13211.5 16760.5 SEXP 13211.5 16760.5 SROP 13251.0 16800.0 LOG HEADER DATA DATE LOGGED: 30- SEP -10 SOFTWARE SURFACE SOFTWARE VERSION: Insite DOWNHOLE SOFTWARE VERSION: 88.2 DATA TYPE (MEMORY OR REAL - TIME): Memory TD DRILLER (FT): 16800.0 TOP LOG INTERVAL (FT): 13251.0 BOTTOM LOG INTERVAL (FT): 16800.0 BIT ROTATING SPEED (RPM): HOLE INCLINATION (DEG MINIMUM ANGLE: 65.7 MAXIMUM ANGLE: 84.0 TOOL STRING (TOP TO BOTTOM) VENDOR TOOL CODE TOOL TYPE TOOL NUMBER DGR DUAL GAMMA RAY 275518 EWR4 ELECTROMAG. RESIS. 4 11241795 CTN COMP THERMAL NEUTRON 181187 BAT Bi -modal Acoustic 195179 ALD Azimuthal Litho -Dens 126973 BOREHOLE AND CASING DATA OPEN HOLE BIT SIZE (IN): 9.875 DRILLER'S CASING DEPTH (FT): 2958.0 BOREHOLE CONDITIONS MUD TYPE: Fresh Water Gel , 410 411 MUD DENSITY (LB /G): 11.50 MUD VISCOSITY (S): 44.0 MUD PH: 9.4 MUD CHLORIDES (PPM): 650 FLUID LOSS (C3): 4.0 RESISTIVITY (OHMM) AT TEMPERATURE (DEGF) MUD AT MEASURED TEMPERATURE (MT): 1.100 70.0 MUD AT MAX CIRCULATING TERMPERATURE: 12.474 169.7 MUD FILTRATE AT MT: 1.500 70.0 MUD CAKE AT MT: 2.300 70.0 NEUTRON TOOL MATRIX: MATRIX DENSITY: HOLE CORRECTION (IN): # TOOL STANDOFF (IN): EWR FREQUENCY (HZ): REMARKS: $ # Data Format Specification Record Data Record Type 0 Data Specification Block Type 0 Logging Direction Down Optical log depth units Feet Data Reference Point Undefined Frame Spacing 60 .1IN Max frames per record Undefined Absent value -999 Depth Units Datum Specification Block sub- type...0 Name Service Order Units Size Nsam Rep Code Offset Channel DEPT FT 4 1 68 0 1 FCNT MWD060 CP30 4 1 68 4 2 NCNT MWD060 CP30 4 1 68 8 3 DTC MWD060 USPF 4 1 68 12 4 DTSH MWD060 USPF 4 1 68 16 5 CALN MWD060 IN 4 1 68 20 6 RHOB MWD060 G /CC 4 1 68 24 7 DRHO MWD060 G /CC 4 1 68 28 8 RPD MWD060 OHMM 4 1 68 32 9 RPM MWD060 OHMM 4 1 68 36 10 RPS MWD060 OHMM 4 1 68 40 11 RPX MWD060 OHMM 4 1 68 44 12 FET MWD060 HR 4 1 68 48 13 GR MWD060 API 4 1 68 52 14 PEF MWD060 B/E 4 1 68 56 15 ROP MWD060 FPH 4 1 68 60 16 NPHI MWD060 PU 4 1 68 64 17 SCRA MWD060 NONE 4 1 68 68 18 First Last Name Service Unit Min Max Mean Nsam Reading Reading DEPT FT 13205.5 16800 15002.8 7190 13205.5 1 16800 FCNT MWD060 CP30 691.42 2843.74 1015.34 7008 13205.5 16709 NCNT MWD060 CP30 128456 193189 149945 7008 13205.5 16709 DTC MWD060 USPF 64.98 96.49 78.6823 6959 13205.5 16684.5 DTSH MWD060 USPF 118.01 176.45 142.368 6959 13205.5 16684.5 CALN MWD060 IN 8.49 11.36 9.8231 7036 13205.5 16723 RHOB MWD060 G /CC 2.229 3.122 2.48777 7036 13205.5 16723 DRHO MWD060 G /CC 0 0.34 0.079086 7036 13205.5 16723 RPD MWD060 OHMM 2.75 2000 10.9007 7099 13211.5 16760.5 RPM MWD060 OHMM 2.74 2000 10.3118 7099 13211.5 16760.5 RPS MWD060 OHMM 2.51 32.98 6.73739 7099 13211.5 16760.5 RPX MWD060 OHMM 2.4 23.56 5.73968 7099 13211.5 16760.5 FET MWD060 HR 0.24 41.47 1.03884 7099 13211.5 16760.5 GR MWD060 API 40.26 415.7 129.821 7182 13205.5 16796 PEF MWD060 B/E 2.63 13.79 5.55095 7036 13205.5 16723 ROP MWD060 FPH 3.54 338.75 131.221 7099 13251 16800 NPHI MWD060 PU 8.83 42.7 29.7219 7008 13205.5 16709 SCRA MWD060 NONE 1.44 2.35 1.80992 6959 13205.5 16684.5 First Reading For Entire File 13205.5 Last Reading For Entire File 16800 File Trailer Service name STSLIB.004 Service Sub Level Name Version Number 1 0 0 Date of Generation 10 /11 /10 Maximum Physical Record 65535 File Type LO Next File Name STSLIB.005 Physical EOF File Header Service name STSLIB.005 Service Sub Level Name Version Number 1 0 0 Date of Generation 10 /11 /10 Maximum Physical Record 65535 File Type LO Previous File Name STSLIB.004 Comment Record FILE HEADER FILE NUMBER: 5 RAW MWD Curves and log header data for each bit run in separate files. BIT RUN NUMBER: 8 DEPTH INCREMENT: .5000 FILE SUMMARY VENDOR TOOL CODE START DEPTH STOP DEPTH SEMP 16774.0 21126.5 SEXP 16774.0 21126.5 SFXE 16774.0 21126.5 SESP 16774.0 21126.5 SEDP 16774.0 21126.5 SGRC 16796.5 21119.5 SROP 16800.5 21168.0 LOG HEADER DATA DATE LOGGED: 18- OCT -10 SOFTWARE SURFACE SOFTWARE VERSION: Insite DOWNHOLE SOFTWARE VERSION: 88.2 DATA TYPE (MEMORY OR REAL- TIME): Memory TD DRILLER (FT): 21168.0 TOP LOG INTERVAL (FT): 16800.0 BOTTOM LOG INTERVAL (FT): 21168.0 BIT ROTATING SPEED (RPM): HOLE INCLINATION (DEG MINIMUM ANGLE: 83.3 MAXIMUM ANGLE: 94.6 TOOL STRING (TOP TO BOTTOM) VENDOR TOOL CODE TOOL TYPE TOOL NUMBER DGR DUAL GAMMA RAY 156432 EWR4 Electromag Resis. 4 93265 BOREHOLE AND CASING DATA OPEN HOLE BIT SIZE (IN): 6.750 DRILLER'S CASING DEPTH (FT): 16784.0 BOREHOLE CONDITIONS MUD TYPE: Mineral Oil Bas MUD DENSITY (LB /G): 9.00 MUD VISCOSITY (S): 47.0 MUD PH: MUD CHLORIDES (PPM): 45500 FLUID LOSS (C3): RESISTIVITY (OHMM) AT TEMPERATURE (DEGF) MUD AT MEASURED TEMPERATURE (MT): MUD AT MAX CIRCULATING TERMPERATURE: 187.3 MUD FILTRATE AT MT: MUD CAKE AT MT: NEUTRON TOOL MATRIX: MATRIX DENSITY: HOLE CORRECTION (IN): TOOL STANDOFF (IN): EWR FREQUENCY (HZ): REMARKS: Data Format Specification Record Data Record Type 0 Data Specification Block Type 0 Logging Direction Down Optical log depth units Feet Data Reference Point Undefined Frame Spacing 60 .1IN Max frames per record Undefined Absent value - 999 Depth Units Datum Specification Block sub- type...0 Name Service Order Units Size Nsam Rep Code Offset Channel DEPT FT 4 1 68 0 1 RPD MWD080 OHMM 4 1 68 4 2 RPM MWD080 OHMM 4 1 68 8 3 RPS MWD080 OHMM 4 1 68 12 4 RPX MWD080 OHMM 4 1 68 16 5 FET MWD080 HR 4 1 68 20 6 GR MWD080 API 4 1 68 24 7 ROP MWD080 FPH 4 1 68 28 8 First Last Name Service Unit Min Max Mean Nsam Reading Reading DEPT FT 16774 21168 18971 8789 16774 21168 RPD MWD080 OHMM 0.75 2000 13.6914 8706 16774 21126.5 RPM MWD080 OHMM 1.06 1703.84 13.3635 8706 16774 21126.5 RPS MWD080 OHMM 1.05 904.96 11.6056 8706 16774 21126.5 RPX MWD080 OHMM 2.92 1581.98 12.1327 8706 16774 21126.5 FET MWD080 HR 0.29 373.13 3.04469 8706 16774 21126.5 GR MWD080 API 34.96 111.93 58.9289 8647 16796.5 21119.5 ROP MWD080 FPH 0.25 235.9 102.393 8736 16800.5 21168 First Reading For Entire File 16774 Last Reading For Entire File 21168 File Trailer Service name STSLIB.005 Service Sub Level Name Version Number 1 0 0 Date of Generation 10 /11 /10 Maximum Physical Record 65535 File Type LO Next File Name STSLIB.006 Physical EOF Tape Trailer Service name LISTPE Date 10 /11 /10 Origin STS Tape Name UNKNOWN Continuation Number 01 Next Tape Name UNKNOWN Comments STS LIS Writing Library. Scientific Technical Services Reel Trailer Service name LISTPE Date 10 /11 /10 Origin STS Reel Name UNKNOWN Continuation Number 01 Next Reel Name UNKNOWN Comments STS LIS Writing Library. Scientific Technical Services Physical EOF Physical EOF End Of LIS File