Alaska Logo
Department of Commerce, Community, and Economic Development
Alaska Oil and Gas Conservation
Commission
Loading...
HomeMy WebLinkAbout203-151MEMORANDUM State of Alaska Alaska Oil and Gas Conservation Commission DATE:Wednesday, July 24, 2024 SUBJECT:Mechanical Integrity Tests TO: FROM:Austin McLeod P.I. Supervisor Petroleum Inspector NON-CONFIDENTIAL ConocoPhillips Alaska, Inc. CD2-18 COLVILLE RIV UNIT CD2-18 Jim Regg InspectorSrc: Reviewed By: P.I. Suprv Comm ________ JBR 07/24/2024 CD2-18 50-103-20466-00-00 203-151-0 W SPT 7074 2031510 3000 2346 2346 2348 2352 590 590 590 590 REQVAR P Austin McLeod 6/9/2024 Two year to MAIP. AIO 18C.012. 30 MinPretestInitial15 Min Well Name Type Test Notes: Interval P/F Well Permit Number: Type Inj TVD PTD Test psi API Well Number Inspector Name:COLVILLE RIV UNIT CD2-18 Inspection Date: Tubing OA Packer Depth 1230 3300 3230 3200IA 45 Min 60 Min Rel Insp Num: Insp Num:mitSAM240609193457 BBL Pumped:2.7 BBL Returned:2.7 Wednesday, July 24, 2024 Page 1 of 1 9 9 9 9 9 9 9 9 9 9 9 9 9 9 9 9 9 9 AIO 18C.012. James B. Regg Digitally signed by James B. Regg Date: 2024.07.24 12:30:24 -08'00' MEMORANDUM State of Alaska Alaska Oil and Gas Conservation Commission DATE:Thursday, July 21, 2022 SUBJECT:Mechanical Integrity Tests TO: FROM:Matt Herrera P.I. Supervisor Petroleum Inspector NON-CONFIDENTIAL ConocoPhillips Alaska, Inc. CD2-18 COLVILLE RIV UNIT CD2-18 Jim Regg InspectorSrc: Reviewed By: P.I. Suprv Comm ________ JBR 07/21/2022 CD2-18 50-103-20466-00-00 203-151-0 W SPT 7074 2031510 3000 2019 2028 2026 2028 730 780 780 780 REQVAR P Matt Herrera 6/27/2022 MIT-IA Performed to MAIP Per AIO 18C.012 30 MinPretestInitial15 Min Well Name Type Test Notes: Interval P/F Well Permit Number: Type Inj TVD PTD Test psi API Well Number Inspector Name:COLVILLE RIV UNIT CD2-18 Inspection Date: Tubing OA Packer Depth 480 3270 3200 3200IA 45 Min 60 Min Rel Insp Num: Insp Num:mitMFH220629143859 BBL Pumped:3.9 BBL Returned:3.9 Thursday, July 21, 2022 Page 1 of 1         MEMORANDUM TO: Jim Regg P.I. Supervisor ���� FROM: Lou Laubenstein Petroleum Inspector NON -CONFIDENTIAL State of Alaska Alaska Oil and Gas Conservation Commission DATE: Friday, July 10, 2020 SUBJECT: Mechanical Integrity Tests ConomPhillips Alaska, Inc. CD2 -18 COLVILLE RIV UNIT CD2 -18 See: Inspector Reviewed By: P.I. P.I. Sup" Comm Well Name COLVILLE RN UNIT CD2 -18 API Well Number 50-103-20466-00-00 Inspector Name: Lou Laubenstem Insp Num: mitLOL200708110931 Permit Number: 203-151-0 Inspection Date: 6/23/2020 Rel Insp Num: Packer Depth Pretest Initial 15 Min 30 Min 45 Min 60 Min [Interval ell cDz-la 'Type [nj w TVD 074 - Tubing Iaso s�6o aeo �s6o D zo3lslo Type Test sPT Test psi 3000 - 600 33zo so - L Pumped: 4.1 BBL Returned: 3.6 OA aao szo szo - szo . — ---- REEQVAR --P/F P - Notes: MIT -IA to maximum anticipated injection pressure per ATO 18C.012 Friday, July 10, 2020 Page 1 of I MEMORANDUM • • State of Alaska Alaska Oil and Gas Conservation Commission TO Jim Regg DATE: Monday,June 11,2018 P.I.Supervisor N (13(ii 6 SUBJECT: Mechanical Integrity Tests CONOCOPHILLIPS ALASKA,INC. CD2-18 FROM: Brian Bixby COLVILLE RIV UNIT CD2-18 Petroleum Inspector Src: Inspector Reviewed By: P.I.Supry j13(2--- NON-CONFIDENTIAL Comm Well Name COLVILLE RIV UNIT CD2-18 API Well Number 50-103-20466-00-00 Inspector Name: Brian Bixby Permit Number: 203-151-0 Inspection Date: 6/5/2018 ,r- Insp Insp Num: mitBDB180610165212 Rel Insp Num: Packer Depth Pretest Initial 15 Min 30 Min 45 Min 60 Min Well CD2-18 Type Inj W TVD 7074 ' Tubing 1860 • 1860 • 1860 ' 1860 j - PTD 2031510 Type Test. SPT Test psi 3000 IA 420 3300 - 3240 3230 ' BBL Pumped: 3.9 BBL Returned: 3.8 OA 800 - j 890 • 890 - 890 Interval REQVAR P/F P Notes: Tested to MAIP as per AIO 18C.012 SCANNED JUN 2 I cuib Monday,June 11,2018 Page 1 of 1 • • Wallace, Chris D (DOA) From: NSK Well Integrity Supv CPF3 and WNS <n2549@conocophillips.com> Sent: Thursday,April 13, 2017 11:09 AM To: Wallace, Chris D (DOA) Cc: Senden, R.Tyler Subject: CD2-18 (PTD#203-151) end of monitor update Attachments: CD2-18 90-day TIO plot.docx SCANNEV APE 2 2017 Chris, The 30-day monitor period for CD2-18(PTD#203-151)while on MI injection ends today. As previously reported, initial diagnostics passed, but the initial IA drawdown test showed minor pressure fluctuations so a 30-day monitor on MI was commenced to allow an extended drawdown. During the first half of the monitor,the IA pressure appeared stable. During the second half of the monitor,the IA pressure has risen to suggest TxIA communication,though temperature fluctuations were also present. CPAI plans to drawdown the IA pressure and extend the MI monitor for 30-days for confirmation and to gather data on the IA pressure build-up rate while on MI. The well would then be WAG'd to water for a 30-day monitor period to confirm integrity on water. If integrity on water is confirmed an AA will be submitted. If TxIA on gas was confirmed, then depending on the results of the monitor periods,the AA application could be for water-only injection or for continued MWAG service with 'maintenance bleeds'. Attached is a 90-day TIO plot. Please let us know if you disagree with this plan. Regards, Rachel Kautz/Travis Smith Well Integrity Supervisor,ConocoPhillips Alaska Inc. Office:907-659-7126 Cell:907-943-0450 1 • • Wallace, Chris D (DOA) From: NSK Well Integrity Supv CPF3 and WNS <n2549@conocophillips.com> Sent: Wednesday, March 15, 2017 9:05 AM To: Wallace, Chris D (DOA) Cc: Senden, R. Tyler Subject: Alpine injector CD2-18 (PTD#203-151) Update Attachments: CRU CD2-18 90-day TIO plot.docx Chris, Alpine injector CD2-18 (PTD#203-151) was previously reported for an anomalous IA pressure increase while on MI injection. DHD has completed diagnostics and obtained a passing MITIA and packoff tests. The drawdown test did show very minor pressure fluctuations, so CPAI intends to put the well on a 30-day MI monitor to confirm integrity. If pressures appear normal throughout the monitor, we intend to treat the well as a normal MWAG injector. However, if TxIA communication becomes evident during the monitor, a follow-up email with a plan forward will be sent. Attached is the 90-day TIO plot. Please let me know if you have any questions or disagree with this plan. Regards, Rachel Kautz/Travis Smith Well Integrity Supervisor, ConocoPhillips Alaska Inc. Office:907-659-7126 Cell:907-943-0450 SCANNED MAR 2 4 2017, 1 • 0 W U a W if)Cf) CO Z CC CC 01 w w U __ y o O WO o Q m O a U. c T O O 0 H0 O N W of in z cc a � J o OJ x mw y O O wO O Q V,n Q. c" cc 1.- to r-n y, 0. S ccs cs, P o O` ri m O jm ao J N N "1 O O g 8 IlI d N 1 _ r� 7 , `tea iCA Ii IlIP a, O -A NI U i Q C ':0 ✓ I11". N l N1 7 Z = Q :.! rA rs0 111 o<�a u < MII : n R �] 8 11Th � N Y I I I R ["1 8 Hi1 O 2 I I �y A W Y Y M R 8 [J 'n E i i i ^ % i5 N C J N W OIK'0A NV 3 2 ISN ) ) Image Project Well History File Cover Page XHVZE This page identifies those items that were not scanned during the initial production scanning phase. They are available in the original file, may be scanned during a special rescan activity or are viewable by direct inspection of the file. ~ 03- j ~ J Well History File Identifier ~wo-sided IIIIIII1I1111111111 Organizing (done) o Rescan Needed 1111111111111111 III RrCAN Jþ Color Items: o Greyscale Items: DIGITAL DATA ~kettes, No. ~ o Other, No/Type: OVERSIZED (Scannable) o Maps: o Other Items Scannable by a Large Scanner D Poor Quality Originals: OVERSIZED (Non-Scannable) o Other: o Logs of various kinds: NOTES: BY: G:) Date: fa- lif 05 I o Other:: /5/ m? 1111111111111111111 ~-.J Project Proofing BY: _~~ Scanning Preparation BY: C Maria J. ) Date: (. ~~.. '4-" OS' , I 4- X 30" ¡ J-..() + ~{ '" TOTAL PAGES /ifl . ø J! ~ .-~ (Count does not include cover sheet) I/}¡.-i) Date: J Cr' i tJ~ /5/ ( V I /5/ Production Scanning Stage 1 Page Count from Scanned File: J Lf ~ (Count does include cover sheet) Page Count Matches Number in Scanni~g Preparation: (V YES BY: ~ Date I d- . j l.f os;- I I Stage 1 If NO in stage 1 page(s) discrepancies were found: YES 111111111111111111 NO 151 VVi~ NO BY: Maria Date: /5/ 1111111111111111111 Scanning is complete at this point unless rescanning is required. ReScanned 1111111111111111111 BY: Maria Date: /5/ Comments about this file: Quality Checked 1111111111111111111 10/6/2005 Well History File Cover Page.doc i MEMORANDUM To: Jim Regg ~~~ ~~~~ ~la P.I. Supervisor FROM: Jeff Jones Petroleum Inspector State of Alaska Alaska Oil and Gas Conservation Commission DATE: Monday, July 26, 2010 SUBJECT: Mechanical Integrity Tests CONOCOPHILLIPS ALASKA INC CD2-18 COLVILLE RIV UNIT CD2-18 Src: Inspector NON-CONFIDENTIAL Reviewed By: P.I. Suprv .~g~-- Comm Well Name: COLVILLE RIV UNIT CD2-18 Insp Num: mitJJ100719122244 Rel Insp Num: API Well Number: 50-103-20466-00-00 Permit Number: 203-15]-0 Inspector Name: Jeff Jones Inspection Date: 6/11/2010 Packer Depth Pretest Initial 15 Min. 30 Min. 45 Min. 60 Min. _. Well cDZ-]s' Type Inj. W' TVD ~o~a IA ]loo zoo " zs9o zsso ' P.T.D 2031510 TypeTest SPT Test psi i 1768 ~ OA 340 360 360 360 Interval4YRTST pnr P 'Tubing 1960 1960 1960 1960 NOteS: 3.2 BBLS diesel pumped. 1 well inspected; no exceptions noted. " ~~ 91'' Monday, July 26, 2010 Page 1 of 1 • N~ 1 ~ ' ~: ` ~ S{~ _ F r ~ ~ ' ~i , v ~i K ~{i' ` ; ~~ ~ ~ t X Q } y~ ~(' ~ f ~ 4 \ 1~ ~ r ~' ~ i ~ y ~ ~ _ , t ~ } ~ ~ ~ ~ ~ ~ ~~ ~ ~ yr y ~` p ~ t C 1" . c 5 ~~ __ F . r ~ ~" P ~_. ~" 1 t~ ~ ~ . t~~ N C~, ~ ' ~ ' ~ f ~ - ` ~ ~ ~ Fe~: . LL~..... ~ ~' . _ 4 `, l.-. E .w, ...~. - 5_ ~ ~. ~' k : ~ L _ ~.<.w . ~ Y. ~ ~ ~ ~ ~ ALASSA OIL A1~iD G~5 CO1~TSk8QATIOI~T CO1~IItIISSIOI~T Mr. Scott Reed U ~'f SEAN PARNELL, GOVERNOR yf 4f ~ a' 333 W. 7th AVENUE, SUITE 100 ~ ANCHORAGE, ALASKA 99501-3539 ~;` PHONE (907) 279-1433 . .~.,..,.-..-..FA~6-...- .~(.907) 276-7542 Alpine Engineer ConocoPhillips Alaska, Inc. P.O. Box 100360 Anchorage, Alaska 99510 ~~~~~'~ ~~'~e~ ~= ~~ ~~~~ ~~~~ t ~ Re: Colville River Field, Alpine Oil Pool, CD2-18 Sundry Number: 309-373 Dear Mr. Reed: Enclosed is the approved Applica.tion for Sundry Approval relating to the above referenced well. Please note the conditions of approval set out in the enclosed form. When providing notice for a representative of the Commission to witness any required test, contact the Commission's petroleum field inspector at (907) 659-3607 (pager). As provided in AS 31.05.080, within 20 days after written notice of this decision, or such further time as the Commission grants for good ca.use shown, a person affected by it may file with the Commission an application for rehearing. A request for rehearing is considered timely if it is received by 4:30 PM on the 23rd day following the date of this letter, or the next working day if the 23rd day falls on a holiday or weekend. A person may not appeal a Commission decision to Superior Gourt unless rehearing has been requested. Sincerely, Daniel T. Seamount, Jr. ~ Chair DATED this /~ay of November, 2009 Encl. • ~~ , ~W,u~ ~ii~~l.~~ V ~~ ~b~ ~' ( STATE OF ~i~~~S NOV ~ 3 2009 . ~~` 1/ A L A SKA OIL AND GAS CONSERVATION MMISSION ~ j(~ V ~~~(~ p~ ~ APPLICATION FOR SUNDRY APPROVAL~~S Zo aP,c Zs.2so ~s~Ca ~i i & Gas Cons. Corr~nission 1. Type of Request: Abandon ~ Suspend ^ Operational Shutdown ^ Perforate ~° Re-enter uspende Well ^ Alter casing ^ Repair well ^ Plug Perforations ^ Stimulate ^ Other ~ Specify: Change approved program ^ Pull Tubing ^ Pertorate New Pool ^ Time Extension ^ 2. Operator Name: 4. Current Well Class: 5. Permit to Drili Number: ConocoPhillips Alaska, InC. Development ^ Exploratory ^ 203-151 ~ 3. Address: Stratigraphic ~ Service ~. 6. API Number: P. O. Box 100360, Anchora e, Alaska 99510 50-103-20466-00 ° 7. If perforating, closest approach in pool(s) opened by this operation to nearest property line `;~~ Well Name and Number: where ownership or landownership changes: Spacing Exception Required? YeS ^ NO ^~ ~ CD2-18 • 9. Property Designation (Lease Number): 10. Field / Pool(s): ADL 380075, 387207 ' Colville River Field / Alpi ne Oil Pool • 11. PRESENT WELL CONDITI ON SUMMARY Total depth MD (ft): Total Depth TVD (ft): Effective Depth MD (ft): Effective Depth ND (ft): Plugs (measured): Junk (measured): 18019' ~ 7215' ' 18019' • 7215' ' Casing Length Size MD TVD Burst Collapse Conductor 109' 16" 109' 109' Surface 3221' 9-5/8" 3221' 2380' Production 12112' 7" 12112' ~292~ Perforation Depth MD (ft): Perforation Depth ND (ft): Tubing Size: Tubing Grade: Tubing MD (ft): open hole completion 12112'-18019' 7292'-7215' 4.5" L-80 11329' Packers and SSSV Type: Packers and SSSV MD (ft) and ND (ft) Baker SAB-3 packer @ 11235' MD / 7105' ND Camco DB-6 landing nipple @ 2636' MD / 2028' ND 12. Attachments: Description Summary of Proposal Q 13. Well Class after proposed work: Detailed Operations Program ^ BOP Sketch ^ Exploratory ~ Development ^ Service ~` 14. Estimated Date for 15. Well Status after proposed work: Commencing Operations: November 23, 2009 Oil ^ Gas ^ WDSPL ^ Plugged ^ 16. Verbal Approval: Date: WINJ J,~~ :~`~ . GINJ ^ WAG 0 " Abandoned^ Commission Representative: ~ 1~ GSTOR ^ SPLUG ^ 17. I hereby certify that the foregoing is true and correct to the best of my knowledge. Contact: Scott Reed @ 265-6548 Printed Name Ott Title: Alpine Engineer Signature Phone 265-6548 Date l Commission Use Onl Sundry Number: Conditions of approval: Notify Commission so that a representative may witness i Plug Integrity ~ BOP Test ~ Mechanical Integrity Test ~ Location Clearance ^ / Other. Subsequent Form Required: ~O' y0 t~ ~ • APPROVED BY ~ ~ ~ COMMISSIONER Approved by THE COMMISSION Date: Form 10-4~ F~vised 07/2009 ~~~~~~ A L ~~S,~u mit in uplicate c4 Lhc3 ~~~D• O~ ~c~i~='~ :~ , ~' , • • TUBING (0.11329, OD:4.500, ID3.958) SURFACE (0-3221, OD:9.625, W1:36.00) 'RODUCTION (0.12712, OD 7.000, W ~26.00 ) Gas Lih ~ndrel/Dummy Valve ~ ;~1121-11122, OD:5.984) PACKER ;1123571236, OD:5.970) NIP ;11317-1~318, OD:5.000) W LEG ;11328-11329, OD:5.000) OPEN HOLE ;12112-18015. OD:6.125) ~ ~o~aco~hil~ip~ ~4t~~~ca, Inc. ALPINE CD2-18 ~ CD2-18 DESCRIPTION SUMMARY OFPROPOSAL • ConocoPhillips Alaska Inc. Colville River Field Well CD2-18 (PTD203-151) Sundry Notice 10-403 Request Perforate Alpine "C" Interval . November 6, 2009 Purpose: This sundry notice is to notify the AOGCC of ConocoPhillips Alaska Inc, intent to perforate the Alpine "C" sand present at the heel of CD2-18 - Proposed Operations: 1. Run tie-in CCL 2. Perforate Alpine "C" sand at 11,974'-11,994' MD 3. Perforate Alpine "C" sand at 12,020'-12040' MD • • CD2-18 Details ,,~~-~s~ ~,_ ~~ ~ ~"~~ ~~~ ~ ~ SJ ~~ Q~' ~{~ APR ~ 9 2008 • AS~sidi~ry of PHILC.IPS FETROLE~A C~lRAt~Y Casing Detail 9 5f8 Surface Basin • Well: CD-2-18 Date: 915/2003 DEPTH Jt Number Num of Jts COMPLETE DESCRIPTION OF EQUIPMENT RUN LENGTH TOPS Doyon 19 RKB to LDS 36.75 FMC Gen V Hanger 2.19 36.75 Jts 53 to 76 24 Jts 9-5/8" 36# J-55 BTC Csg 1008.12 38.94 9-5/8" TAM port collar 2.99 1047.06 Jts 3 to 52 50 Jts 9-5/8" 36# J-55 BTC Csg 2089.74 1050.05 Davis Lynch Float Collar 1.49 3139.79 Jts 1 to 2 2 Jts 9-5/8" 36# J-55 BTC Csg 78.15 3141.28 Davis Lynch Float Shoe 2.32 3219.43 3221.75 TD 12 1/4" Surface Hole 3233.00 RUN TOTAL 43 BOWSPRING CENTRALIZERS - 1 per jt on Jt #1 - # 12 (On stop rings of Jt #1 & #2) 14, 16, 18, 20, 22, 24, 26, 28, 30, 32, 34, 36, 38, 40, 42, 44, 46, 48, 50, 52, 54, 56, 58 60; 62, 64, 66, 68, 70, 72, 74 80 joints total in shed - 76 joints total to run Last 4 joints stay out, # 77 thru # 80 Use API Mod Best O Life Artic Grade Cs Com ound. Remarks: Up Wt - K Ibs Dn Wt - K Ibs Block Wt 75K Ibs Supervisor Guy Whitlock • Cement Detail Report ~. CD2-18 Surface Casing Cement Details - Description - ---- Cementing Start Date Cementing End Date Wellbore Name Surface Casing 9/8/2003 15:13 9/8/2003 17:08 CD2-18 Comment ' Cement Stages - - - - ----- -- - - --a - Description Objective ~ - Top (ftKB) Bottom (ftKB) 'Full Return? Cmnt Rtrn ... Top Plug? Btm Piug? ' Cement Casing 0.0 3,222:0 250.0 Yes Yes O (start) (bbl/min) Q (end) (bbl/min) O (avg) (bbl/min) P (final) (psi) P (bump) (psi) Recip? Stroke (ft) Rotated? Pipe RPM (rpm) 6 2 6 510.0 1,030.0 0.00 Depth tagged (ftK6) Tag Method Depth Plug Drilled Out To (ftKB) Drill Out Diameter (in) Comment Cement Found Between Shoe and Collar (Y/N): N Cement found on liner tool (Y/N): N Annular flow after cement job (Y/N): N Pressure before cementing (psi): 300 Hours circulated between stages: 1.5 Bbls cmt to surf: 225 Method used to measure density: DS Returns (pct): 100 Time cementing mixing started: 15:13 Cement Fluids & Additives ',Fluid _ _ Fluid Type Fluid Description Estimated Top (ftKB) Est Btm (ftKB) Amount (sacks) Class Volume Pumped (bbl) FLUSH Viscosified water w/ 0 40.0 nutp Yield (ft'/sack) Mix H2O Ratio (gal/sa... Free Water (%) Density (Iblgal) Plastic Viscosity (cp) Thickening Time (hrs) CmprStr 1 (psi) 0.00 0.00 0.00 8.30 0.00 0.0 Additives Additive Type Concentration Conc Unit label - - - - - 0.0 -_ - Fluid - -- - _ - - - _ -- _ _ _ _ Fluid Type Fluid Description _ _ _ Estimated Top (ftKB) Est Btm (ftKB) Amount (sacks) Class Volume Pumped (bbl) FLUSH MUDPUSH XL 0 50.0 Yield (ft'/sack) Mix H2O Ratio (gal/sa... Free Water (%) Density (Ib/gal) Plastic Viscosity (cp) Thickening Time (hrs) CmprStr 1 (psi) 0.00 0.00 0.00 10.50 0.00 0.0 Additives Additive Type Concentration Conc Unit label Fluid - - - - _ _ __ ___ - ---_ - -_ - - - Fluid Type Fluid Description --- - _ -- Estimated Top (ftKB) Est Btm (ftK6) Amount (sacks) T Class Volume Pumped (bbl) LEAD ASLite 36.7 2,722.0 531 G 405.0 Yield (ft'/sack) Mix H2O Ratio (gal/sa... Free Water (%) Density (Ib/gal) Plastic Viscosity (cp) Thickening Time (hrs) CmprStr 1 (psi) a ~R 19.39 0.00 10.50 0.00 0.0 Additives Additive Type Concentration Conc Unit label D-44 ACCELERATOR 9.0 %BWOW Additive Type Concentration Conc Unit label S1 ACCELERATOR 1.5 %BWOC Additive Type Concentration Conc Unit label D-46 DEFOAMER 0.6 %BWOC Additive Type Concentration Conc Unit label D-65 DISPERSANT 0.5 %BWOC Additive Type Concentration Conc Unit label D-79 EXTENDER 1.5 %BWOC Additive Type Concentration Conc Unit label D-124 FILLITE 43.1 %BWOC Additive Type Concentration Conc Unit label D-53 GYPSUM 30.0 %BWOC Page 1/2 Report Printed: 4/22/2008 Cement Detail Report - CD2-18 Surface Casing Cement Fluids & Additives --- _ __ -- - _ __ - -------- - Fluid Fluid Type Fluid Description Estimated Top (ftKB) Est Btm (ftKB) Amount (sacks) Glass Volume Pumped (bbl) TAIL 2,722.0 3,222.0 234 G 47.5 Yield (ft /sack) Mix H2O Ratio (gal/sa... Free Water (%) Density (Ib/gal) Plastic Viscosity (cp) Thickening Time (hrs) CmprStr 1 (psi) 1~ 1~_ 5.10 0.00 15.80 0.00 0.0 Additives Additive Type Concentration Conc Unit label S1 ACCELERATOR 2.0 %BWOC Additive Type Concentration Conc Unit label D-46 DEFOAMER 0.2 %BWOC Additive Type Concentration Conc Unit label D-65 DISPERSANT 0.3 %BWOC Page 2/2 Report Printed: 4/22/2008 Security Level: Development Daily Drilling Report CD2-18 Report Number: 5 Rig: DOYON 19 Report Date: 9/8/2003 AFE Type ._....__- i Network/1D#-- ____.----__ _.. _...._ _..___. .Total AFE+Sup _ 10030338 3,561,307.00 Wellbore Well Type Field Name DFS (days) DOL Depth Progress (ft) Depth Start (ftKB) Depth End (ftKB) CD2-18PB1 Development ALPINE 1.00 5.0 Daily Mud Cost Cumulative Mud Cost Daily Cost Total Cumulative Cost 317,322.00 705,221.00 Actual Start Date Original Spud Date AFE Dur Total (days) Projected Job Duration (days) Job Days Ahead (days) Projected Job End Date 9/4/2003 9/8/2003 Last Casing String Next Casing OD (in) Next Casing Set Depth (ftK6) Ops and Depth ~ Morning Report 24hr Forecast N!U BOPE N/U test BOPE. P/U d.p. and BHA RIH Last 24hr Summary Run 9-5/8"" surface casing to 322 1'. Circulate and condition mud. Cement w/ 405 bbl Lead and 48 bbl Tail. Pressure test casing. N/D riser and N/U BOPE General Remarks Weather Head Count 48.0 Supervisor ! Title Johnson/Kuenzler Engineer Engineer G.R. Whitlock, Supervisor Supervisor l 'Time Lo _ _ _ _ Time _ Time (h s) Phase _ ~_ ~~ _ _____ __ _ Op Code OpSub-Code I, P~N T Depth Start ~ ~ Trbl Code Trbl Class. (ftK8) Depth End T ftK8 Operation ' 00:00 00:15 0..25 SURFAC DRILL TRIP P 635.0 168.0' Stand back hwdp and jars to 168' 00:15 02:45 2.50 SURFAC DRILL TRIP P 168.0 0.0 Stand back d.c.'s and UD stabilizer, UBHO, Download MWD, Break bit and adjust motor back to 0. UD MWD tools and clear floor 02:45 04:15 1.50 SURFAC CASE RURD P 0.0 0.0 R/U criers and hold pre-job safety meeting 04:15 09:00 4.75 SURFAC CASE RUNC P 0.0 1,656.0 RIH w/ 9-5/8"" 36#, J-55, BTC csing to 749' w/ insufficient returns. CBU RIH to 877' w/ no returns and taking wt. POOH to 833' and circulate down to 876'. Run casing to 920' w/ no returns. Break circulation and wash casing to 1051 w/ good returns. RIH to 1656' 09:00 09:30 0.50 SURFAC CASE CIRC P 1,656.0 1,656.0 CBU @ 4 bpm-280 psi 09:30 12:00 2.50 SURFAC CASE RUNC P 1,656.0 2,845.0 Continue running 9-5/8"" casing to 2845' w/good returns 12:00 12:30 0.50 SURFAC CASE RUNC P 2,845.0 3,221.0 Continue running 9-5/8"" casing to 3182' M/U landing jt and landi casing @ 3221'. UD fillup tool and blowdown topdrive. R/U cement head 12:30 15:00 2.50 SURFAC CASE CIRC P 3,221.0 3,221.0 Circ and condition mud while reciprocating casing. PU=170k, S/0=125k. 5 bpm @ 230 psi. Hold safety meeting 15:00 16:30 1.50 SURFAC CEMENT PUMP P 3,221.0 3,221.0 Pump 40 bll viscosified water w/ nutplug w/ rig pump. Pump 5 bbl water w/ dowel/ and test lines to 2500 psi. Drop bottom plug. Dowell pumped 40 bbl mud push @ 10.5 ppg 405 bbl lead @ 10.7 ppg, and 48 bbl tail @ 15.8 ppg. Dropped top plug 16:30 17:30 1.00 SURFAC CEMENT DISP P 3,221.0 3,221.0 Dowell pumped 20 bbl water. Pumped 222 bbl mud w! rig pump and bumped plug w/ 1050 psi @ 17:08 hrs. Good returns throughout job. Circulated 225 bbl slurry to surface. Latest BOP Test Data Dat~, Comment Page 1/2 Report Printed: 4/22/2008 r~ r~ Security Level: Development Daily Drilling Report CD2-18 Report Number: 5 ... Rig: DOYON 19 Report Date: 9/8/2003 - Time log - --- -- - --_ _ Start End '; Dur Time Time ~ (hrs) phase __ _ - - '~. Op Code __ - ~ OpSub- Time Code P N T ~ Trbl Code ~ Trbl C Depth Start ~ Depth End (ftK8) I, (ftKB) lass- Operation 17:30 18:30 1.00 SURFAC CASE DEQT P - _ - 0.0 0.0 Check floats-OK. R/U and pressure test casing to 2500 psi for 30 min.-OK 18:30 19:30 1.00 SURFAC CASE RURD P 0.0 0.0 R/D casers. UD landing jt. Flush out surface riser 19:30 21:00 1.50 SURFAC WELCTL NUND P 0.0 0.0 N/D surface riser. N/U unihead. C/O bales and top drive saver sub 21:00 00:00 3.00 SURFAC RIGMNT RGRP P 0.0 0.0 Change out mud cross on BOP's. N/U BOPE Mud Check Data -- Type Depth (ftK8) ~ Dens __- -- _ __ ~. (Iblgaq ~. Vis (slgt) ! - PV Calc (cp) j YP Calc Gel 10s-., Gel. 10m ~ ) { ) (Ibfl100ft~) (Ibf/100ft') (IbfI100fN) _ _ _ - Gel 30m ~ ~ -- ~ - ( ) I HTHP FIIt Density Temp Solids Corr- (Ibf1100ft~) MgT Qb/bbl) '. (mU30min) pfi (°F) (% ) - - - Spud Mud 2,385.0' 9.70 71 20.0 18.000 - - - - 6.0 26.0 -- --_ - -- - 39.016 25.0 8.3 5.9 ,Spud Mud 2,385.0 9.80 86 26.0 24.000 6.0 14.0 26.011 25.0 8.4 ',,Spud Mud 2,385.0 9.80 184 26.0 51.000 34.0 62.0 72.030 26.2 8.6 'Spud Mud 2,385.0 9.80 200 22.0 61.000 39.0 62.0 70.029 25.0 8.3 Wellbores _ - - - - -. _ Wellbore Name Wellbore API/UWI CD2 18PB1 501032046670 Section Size m { ) - - Act To ftK8 Act Btm ftKB i Start Date - ~ End Date P ~ ) - - --- ~ ) ~ ~ - - - Cement -- - - -- _ _ - - ___- Surtace Casin -Started 9/8/2003 Type Wellbore Cemented String Cement Evaluation Results casing CD2-18 Surface, 3,221.OftKB Bond log run (Y/N): N Remedial cement required (Y/N): N Test pressure (psi): 2500 Test time (hrs): 30 Top of cement sufficient (Y/N): N Stg No. Description Top (ftKB) Bottom (ftKB) Q (end) (bbl/... P (final] (psi) 1 C ement Casing 0.0 3,222.0 2 510.0 _ _ -- - Rwd Glass Am ount (sacks) ~~~ V (bbl) j Density _ (Iblgap ~ Yield (ft'Isack) ! Est Top (ftKB) ~ Est ~Btm (ftKB) FLUSH 0 40.0 8.30 0.00 FLUSH 0 50.0 10.50 0.00 LEAD G 531 405.0 10.50 4.28 36.7 2,722.0 TAIL G 234 47.5 15.80 1.16 2,722.0 3,222.0 Page 2/2 Report Printed: 4/22/2008 PRESSURE INTEGRITY TEST CONOCOPHILLIPS Alaska, Inc. Well Name: CD2-18 Rig: Doyon 19 Date: 8/28!2003 Volume Input Volume/Stroke Pump Rate: Drilling Supervisor: Dan Mickey Pump used: #2 Mud Pump ~ strokes ~ 0.0840 Bbls/Strk ~ 0.5 Bbl/min ~ f P i d i Type o Test: Casing Shoe Test LoT/Frr ~ own ump ng annulus and DP. ~ Casin g Tesi Pressure Integrity Test Hole Size: s-1/z" ~ Casing Shoe Depth Hole Depth Pumping Shut-in Pumping Shut-in RKB-CHF: 36.7 Ft 3,221 Ft-MD 2,385 Ft-TVD 3,253 Ft-MD 2,401 Ft-TVD Strks psi Min psi Strks psi Min psi Casing Size and Description: 9-s/s" 36#/Ft J-55 BTC ~ 0 0 0 2525 0 0 0 790 Casin Test Pressure In te ri Tes i 2 25 1 2525 1 10 0.25 785 Mud Weight: 9.8 ppg Mud Weight: 9.6 ppg 4 50 2 2525 2 40 0.5 785 Mud 10 min Gel: 14.0 Lb/100 Ft2 Mud 10 min Gel: 12.0 Lb/100 Ft2 6 150 3 2525 3 100 1 785 Test Pressure: 2,500 psi Rotating Weight: 120,000 Lbs 8 300 4 2525 4 160 1.5 770 Rotating Weight: 75,000 Lbs Blocks/Top Drive Weight: 75,000 Lbs 10 425 5 2525 5 240 2 765 Blocks/Top Drive Weight: 75,000 Lbs Desired PIT EMW: 16.0 ppg 12 650 6 2525 6 320 2.5 760 Estimates for Test: 2.3 bbls Estimates for Test: 794 psi 0.7 bbls 14 800 7 2525 7 390 3 760 ~ ~ 16 950 8 2525 8 460 3.5 755 EMW =Leak-o Pressure + Mud Weight = 800 + 9 6 PIT 15 Second 18 1025 9 2525 9 530 4 750 0.052 x TVD 0.052 x 2385 but ' essure, psi 20 1200 10 2525 10 610 4.5 750 EMW at 3221 Ft-MD (2385 Ft-TVD) = 16.1 ~ 85 22 1350 15 2500 11 670 5 750 3000 L i i h ld 9 9% 24 1475 20 2500 12 740 5 5 750 ost 25 ps dur ng test, e . of test pressure. 26 1600 25 2500 13 800 6 745 28 1750 30 2500 6.5 745 zsoo "`~~'" ~"~"'~~°-~-~ ----~ ~-°-~ u ~ 30 1900 7 740 32 2050 7.5 740 34 2250 8 740' zooo 36 2400 8 5 735 . 37 2525 9 735 tsao 9.5 735 y w 10 735 a 1000 s 500 0 o ~ z a a o s ~0 15 s o z s s o ~~CASING T Barrels EST ---LEAK-O FF TEST Shut-In tim O PIT Poin e, Mi t nute s Vol PUm ume ed Vol Bled ume Back Vol PUm ume ed Volume Bled Back S s S S Comments: Tested casing after bumping plugs and checking floats on cement jok Changed over to new LEND mud prior to PIT t • • Casing Detail Well: CD2-18 7" Intermediate Casing Date: 09/14/03 ConocoPhillips Alaska DEPTH Jt Number Num of Jts COMPLETE DESCRIPTION OF EQUIPMENT RUN LENGTH TOPS Doyon 19 RKB to LDS 34.60 FMC 11" X 7" Hanger 1.67 34.60 Jts 3 to 282 280 Jts 7" 26# L-80 BTCM Csg 11987.58 36.27 7" Weatherford Float Collar 1.33 12023.85 Jts 1 to 2 2 Jts 7" 26# L-80 BTCM Csg 84.78 12025.18 7" Ray Oil Tools Float Shoe(Silver bullet) 2.07 12109.96 12112.03 7" Shoe @ 12,112' TD of 8-112" hole @ 12,124' Total Centralizers: 61 Straight blade centz. one perjt on jts # 1-12, 14,16,18,20,22,24,26,28,30,32 Straight blade centralizer one per jt on jts. # 207,208,& 209 210,212,214,216, 218, 220,222, 224, 226, 228, 230, 232, 234, 236, 238, 24 244, 246,248, 250, 252, 254, 256, 258,260, 262, 264, 266, 268, 270, 272, 27 278, & 280 295 joints in pipe shed - 282 total jts. to run I last 13 joints stay ou Top of Alpine C 11,958' MD - 7249' TVD Use Best-o-Life 2000 i e do e Drifted to 6.151" MU Torque 7,200 ft/Ib Remarks: Up Wt =325 K Dn Wt =940 K Block Wt=75 K Supervisor: Don Mickey l ~ l ~ l Cement Detail Report CD2-18 __ --- - - __ - Production Casing - _ - Cement Details Description Cementing Start Date Cementing End Date Wellbore Name Production Casing 9/15/2003 09:10 9/15/2003 10:41 CD2-18 Comment Cement 7" casing as follows: Pumped 5 bbls CW100 -Test lines to 3500 psi -Pumped 15 bbis Cw100 @ 7.32 ppg 5 bbis/min @ 680 psi -Pumped 50.5 bbls Mud Push XL 12.75 ppg @ 6 bbls/min @ 600 psi -Dropped bottom plug -Mix & pumped 54 bbls Class G w/ 0.2% D46, 0.25% D65, 0.40% D167, .02% XE902 @ 15.8 ppg 5.5 bbls/min @ 470 psi -Dropped top plug w/ 20 bbls water f/ Dowell -Switched to rig pumps ~ displaced w/ 438 bbls 9.6 ppg LSND mud @ 7 to 3.5 bbls/min @ 340 to 790 psi -bumped plug w/ 1240 psi - CIP @ 1041 hrs. Check floats OK Full returns while pumping job -unable to move pipe during job -lost approx. 36 bbls during job - __. - - - - - - Cement Stages -- - - - -- ---- - - - -- ~' Sta~e #_i Description Objective Top (ftKB) Bottom (ftKB) Full Return? Cmnt Rtrn ... Top Plug? Btm Plug? Cement Casing 10,776.0 12,112.0 0.0 Yes Yes O (start) (bbl/min) Q (end) (bbl/min) Q (avg) (bbl/min) P (final) (psi) P (bump) (psi) Recip? Stroke (ft) Rotated? Pipe RPM (rpm) 7 3 5 790.0 1,240.0 0.00 Depth tagged (ftKB) Tag Method Depth Plug Drilled Out To (ftKB) Drill Out Diameter (in) Comment Cement Found Between Shoe and Collar (Y/N): N Cement found on liner tool (Y/N): N Annular flow after cement job (Y/N): N Pressure before cementing (psi): 700 Hours circulated between stages: 2 Bbls cmt to surf: N/A Method used to measure density: densemeter Returns (pct): 100 Time cementing mixing started: 09:10 - - -- - - Cement Fluids & Additives - - - - -_ -- _ Fluid Fluid Type Fluid Description Estimated Top (ftKB) Est Btm (ftKB) Amount (sacks) Class Volume Pumped (bbl) FLUSH CW100 0 20.0 Yield (ft'/sack) Mix H2O Ratio (gal/sa... Free Water (%) Density (Ib/gal) Plastic Viscosity (cp) Thickening Time (hrs) CmprStr 1 (psi) 0.00 0.00 0.00 7.30 0.00 0.0 Additives Additive Type Concentration Conc Unit label - _ -- - Fluid -- - -_ - , , __ ___ - _ - _--_ Fluid Type Fluid Description Estimated Top (ftKB) Est Btm (ftKB) Amount (sacks) Class Volume Pumped (bbl) Spacer MUDPUSH XL 0 50.0 Yield (fN/sack) Mix H2O Ratio {gal/sa... Free Water (%) Density (Ib/gal) Plastic Viscosity (cp) Thickening Time (hrs) CmprStr 1 (psi) 0.00 0.00 0.00 12.50 0.00 0.0 Additives Additive Type Concentration Conc Unit label Fiuia Fluid Type 'Fluid Description Estimated Top (ftKB) Est Btm (ftKB) Amount (sacks) Class Volume Pumped (bbl) PRIMARY 10,776.0 12,112.0 252 G 54.0 Yield (fY/sack) Mix H2O Ratio (gal/sa... Free Water (%) Density (Ib/gal) Plastic Viscosity (cp) Thickening Time (hrs) CmprStr 1 (psi) 1.16 0.00 0.00 15.80 0.00 0.0 Additives Additive Type Concentration Conc Unit label D167 0.4 Additive Type Concentration Conc Unit label EX920 0.02 Additive Type Concentration Conc Unit label D-46 DEFOAMER 0.2 Additive Type Concentration Conc Unit label D-65 DISPERSANT 0.25 Page 1/1 Report Printed: 4/22/2008 r~ • Security Level: Development Daily Drilling Report CD2-18 . ... Report Number: 12 Rig: DOYON 19 Report Date: 9/15/2003 AFE Type- __ __ __. ---.__.._ ___.. _.-- -Nelworl</ID# _ _.__. _ _.~._ Total AFE+Sup 10030338 3,561,307.00 Wellbore Well Type Field Name DFS (days) DOL Depth Progress (ft) Depth Start (ftKB) Depth End (ftKB) CD2-18P61 Development ALPINE 8.00 12.0 0.00 12,124.0 12,124.0 Daily Mud Cost Cumulative Mud Cost Daily Cost Total Cumulative Cost 360,059.00 2,087,295.00 Actual Start Date Original Spud Date AFE Dur Total (days) Projected Job Duration (days) Job Days Ahead (days) Projected Job End Date 9/4/2003 9/8/2003 Last Casing String Next Casing OD (in) Next Casing Set Depth (ftKB) Open Hole, 18,018.OftKB Ops and Depth @ Morning Report 24hr Forecast Washing down @ 11,940' Drill out shoe track -FIT -Drill 6 1/8" hole Last 24hr Summary Finish running 7"" casing to 12,11 2' -Cement 7"" w/ 54 bbls Class G CIP @ 1041 hrs. - RD cmt equip. -set & test packoff - RU ~ Test BOPE - MU 6 1/8 BHA - RIH General Remarks Weather Head Count 50.0 - - -__ Supervisor Title I. Don Mickey. Supervisor Supervisor Johnson/Kuenzler, Engineer Engineer lime Lo E _ _ 1 _ i )art D( D~ t nd~ I ,Tme ~ e (hrs) Phase ~ t (ftKB ft KB) ___-._ Op era4on NT Trbl Code _Trtl Class '. OpCode I OpSub Code______P _-- _ 00:00 00:30 0.50 INTRMI g p@ @ CASE CIRC P 8,123.0 8,123.0 Continue arculatin btms u 8123' 4 bbls/min @ 410 psi final PU 250 SO 145 00:30 03:00 2.50 INTRM1 CASE RUNC P 8,123.0 10,697.0 Continue to run 7"" casing f! 8123' to 10,697' (250 jts total) full returns while running pipe 03:00 04:30 1.50 INTRM1 CASE CIRC P 10,697.0 10,697.0 Break circulation & circulate btms up + @ 10,697' 4 bbls/min @ 580 psi PU 325 SO 150 04:30 06:15 1.75 INTRMI CASE RUNC P 10,697.0 12,112.0 Finish running 7"" casing f/ 10,697'to 12,075' (282 jts. total ran) PU hanger & landing jt. -Land casing in wellhead on FMC fluted hanger w/shoe @ 12,112' & FC @ 12,094' SO wt 145 06:15 06:45 0.50 INTRM1 CASE OTHR P 12,112.0 12,112.0 RD fill up tool -blow down top drive - MU cement head & lines 06:45 08:45 2.00 INTRM1 CEMENT CIRC P 12,112.0 12,112.0 Circulate & condition mud & hole for cement job -stage pumps up slowly to 5 bbls/min @ 700 psi final - PJSM 08:45 10:45 2.00 INTRM1 CEMENT PUMP P 12,112.0 12,112.0 Cement 7"" casing as follows: Pumped 5 bbls CW100 -Test lines to 3500 psi - Pumped 15 bbls Cw100 @ 7.32 ppg 5 bbls/min @ 680 psi -Pumped 50.5 bbls Mud Push XL 12.75 ppg @ 6 bbls/min @ 600 psi -Dropped bottom plug -Mix ~ pumped 54 bbls Class G w/ 0.2% D46, 0.25% D65, 0.40% D167, .02% XE902 @ 15.8 ppg 5.5 bbls/min @ 470 psi - Dropped top plug w/ 20 bbls water f/ Dowell -Switched to rig pumps & displaced w/ 438 bbls 9.6 ppg LSND mud @ 7 to 3.5 bbls/min @340 to 790 psi - bumped plug w/ 1240 psi -CIP @ 1041 hrs. Check floats OK Full returns while pumping job -unable to move pipe during job -lost approx. 36 bbls during job Latest BOP Test Data Date - ~ ~ Comment I Page 1/2 Report Printed: 4/22/2008 Security Level: Development Daily Drilling Report CD2-18 . ~ , Report Number: 12 - Rig: DOYON 19 Report Date: 9/15/2003 Time Log -- --- _ - __ - Stag End Time Time . .. Dur -~ (hrs) Phase Op Code ~ OpSub --- j Time Code P N T P DepthEnd -.. - ---__ - __ -_.. l ~i De th Start '~ Trbl Code Trbl Class ~ (ffKB) '. (ftK8)~ .Operation +++ 10:45 11:30 0.75 INTRM1 CASE DEQT P _. 12,112.0 12,112.0 RU & test 7"" casing to 3500 psi for 30 mins. -pressure bleed down to 3270 psi 11:30 13:30 2.00 INTRM1 CEMENT PULD P 12,112.0 12,112.0 RD cement head & lines - LD landing jt. - casing elevators & long bails Pull thin wall wear bushing -set & test 7"" x 9 5/8"" packoff to 5000 psi 13:30 14:30 1.00 INTRM1 WELCTL EQRP P 0.0 0.0 Change top pipe rams f/ 7"" to 3 1/2"" x 6"" VBR 14:30 18:00 3.50 INTRM1 WELCTL BOPE P 0.0 0.0 Test BOPE -pipe rams, blind rams, choke & kill line valves, choke manifold valves, Auto & manual IBOP in TD, floor dart & TIW valves to 250 & 5000 psi - Hydril to 250 & 3500 psi -performed accumulator closure test- Witnessing of test waived by Jeff Jones AOGCC Blow down kill & choke lines 18:00 19:00 1.00 INTRMI DRILL OTHR P 0.0 0.0 Pull test plug set wear bushing - PU drilling bails ~ 4"" DP elevators 19:00 21:00 2.00 1NTRM1 DRILL PULD P 0.0 398.0 MU 6 1/8"" BHA -Bit -motor -MWD - orient Motor &MWD -upload MWD -RIH w/ NM flex DC's & HWDP to 398' - shallow test MWD OK 21:00 00:00 3.00 INTRM1 DRILL TRIP P 398.0 3,802.0 RIH w/ 6 1/8"" BHA -picking up 4"" drill pipe f/ shed to 3802' (fill pipe every 2000 ~) Mud Check Data Type LSND pepth (ftKB) ' Dene Qb/gal) Vie (s/qf) ~ PV Calc (ep) ~ ~__ - iii _111 7,271.0 9.60 40 8.0 _ _ YP Calc ~ Gel (10s) ~ Gei (10m) ~ Gel (30m) ~ HTHP Fitt Density Temp' Solids Cow (Ibf/'IOOft) (Ibf1100Pt~), Ubf1"I DOR') pbf/900ft~) I MBT Ib/bbl (mU30min T -- - --_ .._ _. - -_ ( ) ~ PH_ I- (~~ 1__ _~~) 17.000 7.0 12.0 13.005 12.5 10.0 8.7 5.1 LSND 7,271.0 9.60 41 8.0 18.000 8.0 12.0 13.005 13.7 9.6 8.8 5.1 LSND 7,271.0 9.60 55 8.0 _ __ 32.000 17.0 21.0 23.009 12.5 9.8 9.0 6.1 -- ' Weltbores - - -- - - - Wellbore Name Wellbore API/UWI CD2-18PB1 501032046670 .- Section_ Size ([n) I Ad Top (ftK8) -.--- - pct Btm (ftKB) Start Date ! - End Date - - ~ ~ ~ i ~ - - ''Cement -- -----__ ---- Production Casin -Started 9/15/2003 Type Wellbore Cemented String Cement Evaluation Results casing CD2-18 Production, 12,112.OftK6 Bond log run (Y/N): N Remedial cement required (Y/N): N Test pressure (psi): 3500 Test time (hrs): 30 Top of cement sufficient (Y/N): N Stg No. Description Top (ftKB) Bottom (ftKB) Q (end) (bbl/... P (final) (psi) 1 Cement Casing 10,776.0 12,112.0 3 790.0 . Rwd Class Am _ - - _ LL ount (sacks) ii V (bbl)Density (Ib/gall '~ Yield (ft'/sack Est Top (ftKB) ' Est Btrn (ftKB) - - FLUSH 0~ 20.0 7.30 0.00 Spacer 0 50.0 12.50 0.00 PRIMARY G 252 54.0 15.80 1.16 10,776.0 12,112.0 Page 2/2 Report Printed: 4/22/2008 PRESSURE INTEGRITY TEST CONOCOPHILLIPS Alaska, Inc. Well Name: CD2-18 Rig: Doyon 19 Date: 9/15/2003 Volume Input Pump Rate: Drilling Supervisor: Don Mickey Pump used: Cement Unit ~ Barrels ~ Bbls/Strk ~ 0.5' Bbl/min ~ P i d Type of Test: Annulus Leak Off Test for Disposal Adequacy ~ ump ng own annulus. ~ Casin g Test Pressure Integrity Test Hole Size: $-1/i" ~ Casing Shoe Depth Hole Depth Pumping Shut-in Pumping Shut-in RKB-CHF: 36.7 Ft 3,221 Ft-MD 2,385 Ft-TVD 10,776 Ft-MD 6,846 Ft-TVD Bbls psi Min psi Bbls psi Min psi Casing Size and Description: 9-5/8" 36#/Ft J-55 BTC ~ 0 0 0 515 Chan es for Annula r Ade u ac Tes Pressure In te ri Tes i 0.5 98 0.25 488 outer casing shoe test result: in comments Mud Weight: 9.6 ppg 1 155 0.5 479 Description references oute casing string Inner casing OD 7.0 In. 1.5 208 1 464 ize is that drilled below oute casing. 2 263 1.5 41'7 timated TOC for Hole Depth 2.5 299 2 435 Enter inner casing OD at righ Desired PIT EMW: 14.5 ppg 3 345 2.5 424 Estimates for Test: 608 psi 0.6 bbls 3.5 381 3 408 ~ ~ 4 415 3.5 405 EM =Leak-off Pressure + Mud Weight = 625 + 9 6 PIT 15 Second 4.5 437 4 400 . 0.052 x TVD 0.052 x 2385 Shut-in Pressure, psi 5 472 4.5 391 EMW at 3221 Ft-MD (2385 Ft-TVD) = 14.6 488 5.5 500 5 384 iooo 6 541 5 5 378 . 6.5 596 6 372 7 625 6.5 367 7.5 607 7 362 8 600 7.5 357 5 8 576 8 352 . w 9 564 8.5 347 ~ 9.5 515 9 343 eoo 9.5 338 N w 10 33 IY a - ~ ~ ~ J 0 0 1 2 3 4 5 6 7 8 9 1 0 0 5 1 0 ~~ 'CASI NG TES B T arrels - f-LEA K-OFF TEST Shut-In tim O PIT Poin e, Minutes t Vol PUm ume ed Vol Bled ume Back Vol PUm ume ed Vol Bled ume Back S S S S omments: 9-5/8" casing shoe tested to 16.1 ppg EMW when rilled aut • • --~.._ *- ~ ~... ~~ ~_~- - ~` ~~- ' - .~. ~i ' • ~ 031o~~zoos DO NOT PLACE ANY NEW MATERIAL UNDER THIS PAGE F:\LaserFiche\CvrPgs_Inserts\Microfitm Rrtarker.doc // ConocoPhillips Alaska P.O. BOX 100360 ANCHORAGE, ALASKA 99510-0360 April 11, 2007 Mr. Tom Maunder Alaska Oil & Gas Commission 333 West th Avenue, Suite 100 . DtJ7 Anchorage, AI< 99501 S~ p..?R ~ 1 'l ~_ \5 \ ~Ou Dear Mr. Maunder: Sorry for the inconvenience, however it was observed H1.at a sprèaQsfìe~t sent to you and dated 3/31/07 was incomplete. Enclosed please find a spreadsheet with a list of wells from the Alpine field (ALP). It was noticed that Alpine well CD2-404 was unintentionally left out of spreadsheet dated 3/31/07. Please find enclosed updated spreadsheet, and replace: As per previous agreement with the AOGCC, this letter and spreadsheet serves as notification that the treatments took place and meets the requirements of form 10-404, Report 0 f Sundry Operations. Please call Jerry Dethlefs or M.J. Loveland at 907-659-7043, if you have any questions. Sincerely, /JP/~~ M.f.~ove~and ConocoPhillips Well Integrity Project Supervisor ConocoPhillips Alaska Inc. Surface Casing by Conductor Annulus Cement, Corrosion inhibitor, Sealant Top-off Corrosion Initial top of Vol. of cement Final top of Cement top off Corrosion inhibitor/ Well Name PTO# cement pumped cement date inhibitor sealant date ft bbls ft ç¡al C02-1 205-118 4" na 4" na 2 2/18/2007 C02-2 205-1 09 6" na 6" na 2.5 2/18/2007 C02-404 206-054 6" na 6" na 1.8 3/22/2007 C02-7 203-187 16" na 16" na 7.5 2/17/2007 C02-9 202-129 22" na 22" na 10.5 2/17/2007 C02-12 203-073 16" na 16" na 7.5 2/17/2007 C02-14 201-177 4" na 4" na 2 2/17/2007 C02-15 201-159 12" na 12" na 5.7 2/17/2007 C02-16 202-144 11 '7" 1.6 4" 4/16/2003 1 3/8/2007 C02-17 205-017 18' 2.5 4" 4/16/2003 1 3/8/2007 C02-18 203-151 36" na 36" na 17 2/1712007 C02-19 202-112 11'5" 1.6 4" 4/16/2003 1.5 318/2007 C02-21 204-245 6" na 6" na 2.5 2/18/2007 C02-22 202-092 13'6" 1.8 4" 4/16/2003 1.5 318/2007 C02-24 201-095 6" na 6" na 1 3/8/2007 C02-26 201-232 10'5" na 4" 4/16/2003 1 3/8/2007 C02-28 202-217 29" na 29" na 11 3/8/2007 C02-30 203-135 8" na 8" na 3 3/8/2007 C02-31 204-082 15" na 15" na 6 3/8/2007 C02-32 202-029 8'6" 1.2 4" 4/16/2003 1 318/2007 C02-33 201-125 7' 1.0 4" 4/16/2003 1 3/8/2007 C02-34 202-126 4' 0.6 4" 4/16/2003 1 3/8/2007 C02-37 202-211 29" na 29" na 13.8 2/18/2007 C02-38 202-171 18" na 18" na 8.5 2/18/2007 C02-39 201-160 34" na 34" na 16.2 2/18/2007 C02-44 202-165 13" na 13" na 6.2 2/18/2007 C02-46 202-082 7'4" 1.0 12" 4/16/2003 5.7 2/18/2007 C02-47 201-205 25" na 25" na 11.9 2/18/2007 C02-48 202-108 10'6" 1.4 7" 4/16/2003 3.3 2/18/2007 C02-49 201-249 9'11" 1.3 8" 4/16/2003 3.5 2/18/2007 CO2-53 204-089 4" na 4" na 2 2/18/2007 CO2-54 204-178 8" na 8" na 3.7 2/18/2007 CO2-55 203-118 13" na 13" na 6 2/18/2007 CO2-57 204-072 8" na 8" na 1 3/8/2007 CO2-58 203-085 6" na 6" na 1 3/8/2007 CO2-59 204-248 6" na 6" na 1.5 3/8/2007 C02-60 205-068 6" na 6" na 1 3/8/2007 Alpine Field March 31,2007 . . ~ ConocoPhillips Alaska P.O. BOX 100360 ANCHORAGE, ALASKA 99510-0360 March 31, 2007 Mr. Tom Maunder Alaska Oil & Gas Commission 333 West ih Avenue, Suite 100 Anchorage, AK 99501 sCANNE.D JWR 0 5 2.007 a.þ'Y 15/ Dear Mr. Maunder: Enclosed please find a spreadsheet with a list of wells ITom the Alpine field (ALP). Some of these wells were found to have a void in the conductor by surface casing annulus. The voids that were greater than 3 feet were first filled with cement to a level of approx. 1.0 foot. The remaining volume of annular void subsequently was filled with a corrosion inhibiter engineered to prevent water ITom entering the annular space. As per previous agreement with the AOGCC, this letter and spreadsheet serves as notification that the treatments took place and meets the requirements of form 10-404, Report of Sundry Operations. Please call Jerry Dethlefs or M.J. Loveland at 907-659-7043, if you have any questions. Sincerely, ~~C Jerry Dethlefs ConocoPhillips Well Integrity Proj Supervisor Attachment . . ConocoPhillips Alaska Inc. Surface Casing by Conductor Annulus Cement, Corrosion inhibitor, Sealant Top-off Alpine Field March 31,2007 Corrosion Initial top of Vol. of cement Final top of Cement top off Corrosion inhibitor/ Well Name PTO# cement pumped cement date inhibitor sealant date ft bbls ft gal C02-1 205-118 4" na 4" na 2 2/18/2007 C02-2 205-109 6" na 6" na 2.5 2/18/2007 C02-7 203-187 16" na 16" na 7.5 2/17/2007 C02-9 202-129 22" na 22" na 10.5 2/17/2007 C02-12 203-073 16" na 16" na 7.5 2/17/2007 C02-14 201-177 4" na 4" na 2 2/17/2007 C02-15 201-159 12" na 12" na 5.7 2/17/2007 C02-16 202-144 11 '7" 1.6 4" 4/16/2003 1 3/8/2007 C02-17 205-017 18' 2.5 4" 4/16/2003 1 3/8/2007 C02-18 203-151 36" na 36" na 17 2/17/2007 C02-19 202-112 11'5" 1.6 4" 4/16/2003 1.5 3/8/2007 C02-21 204-245 6" na 6" na 2.5 2/18/2007 C02-22 202-092 13'6" 1.8 4" 4/16/2003 1.5 3/8/2007 C02-24 201-095 6" na 6" na 1 3/8/2007 C02-26 201-232 10'5" na 4" 4/16/2003 1 3/8/2007 C02-28 202-217 29" na 29" na 11 3/8/2007 C02-30 203-135 8" na 8" na 3 3/8/2007 C02-31 204-082 15" na 15" na 6 3/8/2007 C02-32 202-029 8'6" 1.2 4" 4/16/2003 1 3/8/2007 C02-33 201-125 7' 1.0 4" 4/16/2003 1 3/8/2007 C02-34 202-126 4' 0.6 4" 4/16/2003 1 3/8/2007 C02-37 202-211 29" na 29" na 13.8 2/18/2007 C02-38 202-171 18" na 18" na 8.5 2/18/2007 C02-39 201-160 34" na 34" na 16.2 2/18/2007 C02-44 202-165 13" na 13" na 6.2 2/18/2007 C02-46 202-082 7'4" 1.0 12" 4/16/2003 5.7 2/18/2007 C02-47 201-205 25" na 25" na 11.9 2/18/2007 C02-48 202-108 10'6" 1.4 7" 4/16/2003 3.3 2/18/2007 C02-49 201-249 9'11" 1.3 8" 4/16/2003 3.5 2/18/2007 CO2-53 204-089 4" na 4" na 2 2/18/2007 CO2-54 204-178 8" na 8" na 3.7 2/18/2007 CO2-55 203-118 13" na 13" na 6 2/18/2007 CO2-57 204-072 8" na 8" na 1 3/8/2007 CO2-58 203-085 6" na 6" na 1 3/8/2007 CO2-59 204-248 6" na 6" na 1.5 3/8/2007 C02-60 205-068 6" na 6" na 1 3/8/2007 MEMORANDUM . State of Alaska . Alaska Oil and Gas Conservation Commissl TO: Jim Regg P.I. Supervisor KRtl 2A3D(u(c' DATE: Wednesday, August 30, 2006 SUBJECT: Mechanical Integrity Tests CONOCOPHll..LIPS ALASKA INC CD2-18 COL Vll..LE RIV UNIT C02-1 8 Src: Inspector ;;p"?i' IS \ Reviewed By: P.I. Suprv ~'5 F- Comm FROM: Chuck Scheve Petroleum Inspector NON-CONFIDENTIAL Well Name: COLVILLE RIV UNIT C02-1 8 API Well Number 50-103-20466-00-00 Inspector Name: Chuck Scheve Insp Num: mitCS060828141027 Permit Number: 203-151-0 Inspection Date: 8/27/2006 Rei Insp Num Packer Depth Pretest Initial 15 Min. 30 Min. 45 Min. 60 Min. Well C02-1 8 Type Inj. w TVD 7074 IA 1100 3160 3140 3140 P.T. 2031510 TypeTest SPT Test psi 1768.5 OA 220 400 400 400 Interval 4YRTST PIF P V Tubing 2100 2100 2100 2100 Notes Pretest pressure observed and found stable SCANNED SEP 082006 Wednesday, August 30,2006 Page I of I e - Casing Detail 9 5/8 Surface Casing WPHILLIPS Alaska, Inc. ~~ -- \5 \ '~ A Subsidiary of PHilLIPS PETROLEUM COMPANY U"'-" Jt Number Num of Jts COMPLETE DESCRIPTION OF EQUIPMENT RUN Jts 53 to 76 Doyon 19 RKB to LDS FMC Gen V Hanger 9-5/8" 36# J-55 BTC Csg 9-5/8" TAM port collar 9-5/8" 36# J-55 BTC Csg Davis Lynch Float Collar 9-5/8" 36# J-55 BTC Csg Davis Lynch Float Shoe 24 Jts Jts 3 to 52 50 Jts Jts 1 to 2 2 Jts TD 12 1/4" Surface Hole RUN TOTAL 43 BOWSPRING CENTRALlZERS- 1 per jt on Jt #1 - # 12 (On stop rings of Jt #1 & #2) 14,16,18,20,22,24,26,28,30,32,34,36,38, 40,42,44,46,48,50,52,54,56,5860,62,64,66,68,70,72,74 ~()'o "'; \\a) "to-- S~~~ \- v~ ,'-. \:) if à-\ ~ \) C~~~lL~f\ t\VV ht"r..~\þ ,'-3\.~~~.)\J" 80 joints total in shed - 76 joints totai to run ,.0 -1"fI1 (' Last 4 joints,stay out, # 77 thru # 80 ¡qy \:~rf~J /l Use API Mod Best 0 Life Artie Grade Csg Compound. Remarks: Up Wt - K Ibs Dn Wt - K Ibs Block Wt 75K Ibs Supervisor Guy Whitlock Well: Date: LENGTH 36.75 2"19 1008.12 2.99 2089.74 1.49 78.15 2.32 CD~:2~'1 9/S/20û¿;; DEPTH TOPS 36.75 38.94 1047"06 1050.05 3139.79 3141.28 3219.43 3221.75 3233.00 ConocoPhillips Alaska Casing Report Page 1 of 1 Legal Well Name: CD2-18 Common Well Name: CD2-18 Event Name: ROT - DRILLING Report #: Start: 1 9/8/2003 Spud Date: 9/8/2003 Report Date: 9/8/2003 End: 9/23/2003 General Information String Type: Surface Casing Hole TVD: 2,352.0 (ft) Ground Level: 15.90 (ft) Circ Hours: (hr) Permanent Datum: Kelly Bushing Hole Size: 12250 (in) KB-Datum: 52.00 (ft) Water TMD: (ft) . CF F!evation: (ft) Liner Overlap: (ft) Mud Lost: (bbl) KB to Cutoff: 36.75 (ft) Hole TMD: Str Wt on Slips: Max Hole Angle: Days From Spud: 3,233.0 (ft) (Ibs) n 4.00 (days) e Casing Flange I Wellhead Manufacturer: FMC Hanger Model: Actual TMD Set: 3,221.75 (ft) Model: Injector Packoff Model: Top Hub/Flange: (in) / (psi) BTM Hub/Flange: (in) / (psi) Integral Casing Detail Item Size Weight Grade Drift Threads JTS Length Top MU Torq. THD Manufacturer Model Condo Max aD MinlD Compo Name (in.) (Ib/ft) (in) (ft) (ft) (ft-Ibf) (in) (in) Casing Hanger 9.625 2.19 36"75 NEW Casing Hanger Casing 9.625 36.00 J-55 8.765 BTC 24 1,008.12 38.94 NEW 8.921 9 5/8" 36# J-55 Cement Stage Tool 9.625 2.99 1,047.06 TAM Port colla r NEW Cement Stage Tc Casing 9.625 36.00 J-55 8.765 BTC 50 2.089.74 1.050.05 NEW 8.921 9 5/8" 36# J-55 Float Collar 1.49 3,139.79 Y WEATHERFORD NEW Float Collar Casing 9.625 36.00 J-55 8.765 BTC 2 78.15 3.141.28 Y NEW 8.921 9 5/8" 36# J-55 e Float Shoe 2.32 3,219.43 Y RAY OIL TOOLS Silver Bullet NEW Float Shoe Non-Integral Ca$ing Accessories Accessory Manufacturer Number Spacing (ft) Interval Top (ft) Bottom (ft) How Fixed Stop Collars Bowspring Centralizer Bowspring Centralizer WEATHERFORD WEATHERFORD WEATHERFORD 2 12 31 Clamped OverCollar OverCollar Remarks TAM port collar run due to lost circulation experienced when drilling at 2400' and tight hole when pulling out of hole to run casing. Printed: 8/16/2005 6:59:46 AM e e ConocoPhillips Alaska Cementing.Report Legal Well Name: CD2-18 Common Well Name: CD2-18 Event Name: ROT - DRILLING Primary Hole Size: 12"250 (in) TMD Set: 3,222 (ft) Date Set: 9/8/2003 Csg Type: Surface Casing Csg Size: 9"625 (in.) Cmtd. Csg: Surface Casing Cement Co: Dowell Schlumberger Rot Time Start: Rec Time Start: Time End: Time End: Type: Cement Casing Volume Excess %: 50.00 Meas. From: 225 Time Circ Prior To Cementing: 1.50 Mud Circ Rate: 42 (gpm) Mud Circ Press: 300 (psi) Report #: Start: 1 9/8/2003 Cement Job Type: Primary Squeeze Open Hole Hole Size: sa TMD: (ft) sa Date: sa Type: Cmtd. Csg: Squeeze Gasing Hole Size: TMD Set: Date Set: Csg Type: sa TMD: sa Date: Cmtd. Csg: Page 1 of 3 Spud Date: 9/8/2003 Report Date: 9/8/2003 End: 9/23/2003 Plug Hole Size: Top Set: (ft) BTM set: (ft) Plug Date: Plug Type: Drilled Out: Cmtd. Csg: Cementer: Jim Thompson Pipe Movement Pipe Movement: Reciprocating RPM: SPM: Init Torque: Stroke Length: (ft-Ibf) (ft) Avg Torque: (ft-Ibf) Drag Up: (Ibs) Stage No: 1 of 1 Start Mix Cmt: 15:13 Start Slurry Displ: 15:13 Start Displ: 16:23 End Pumping: 17:08 End Pump Date: 9/8/2003 Top Plug: Y Bottom Plug: Y Type: Spud Mud Density: (ppg) Visc: (s/qt) Bottom Hole Circulating Temperature: (OF) Displacement Fluid Type:Mud Slurry Data Fluid Type: FLUSH Slurry Interval: (ft) Water Source: Test Data Thickening Time: Free Water: (%) Fluid Loss: (cc) Fluid Loss Pressure: (OF) Disp Avg Rate: Disp Max Rate: Bump Plug: Press Prior: Press Bumped: Press Held: Float Held: 6"00 (bbl/min) 6.00 (bbl/min) Y 510 (psi) 1,030 (psi) 2 (min) Y Max Torque: (ft-Ibf) Drag Down: (Ibs) Returns: 100 Total Mud Lost: (bbl) çmt \fOIJo Surf: 250"00 (bbl) Ann Flow After: N Mixing Method: Density Meas By: DS PV/yP: (cp)/ (lb/100ft2) Gels 10 sec: (lb/100ft2) Gels 10 min: (lb/100ft2) Bottom Hole Static Temperature: (OF) Density: 9.8 (ppg) Volume: 242.70 (bbl) Mud Data Stage No: 1 Slurry No: 1 of4 To: (ft) Description: Viscosified water w/ nutp Cmt Vol: 40.0 (bbl) Density: 8.30 (ppg) Slurry Vol: (sk) Water Vol: (bbl) Class: Yield: (ft3/sk) Other Vol: 0 Temperature: (OF) Temperature: ¡OF) Temperature: ¡OF) Time Compressive Strength 1: Compressive Strength 2: Purpose: SPACER Mix Water: (gal) Foam Job: N Temp (OF) ¡OF) Pressure (psi) (psi) Ponted: 611612005 6:59:27 AM e e Page 2 of 3 ConocoPhillips Ala.ska Cementing Report Legal Well Name: CD2-18 Common Well Name: CD2-18 Event Name: ROT - DRILLING Report #: Start: Spud Date: 9/8/2003 Report Date: 9/8/2003 End: 9/23/2003 1 9/8/2003 Trade Name Type Stage No: 1 Slurry No: 101 4 -Additives Units I Concentration Units Liquid Cone. Stage No: 1 Slurry No: 2 of 4 Slurry Data Fluid Type: Slurry Interval: Water Source: FLUSH (ft) To: (ft) Description: MUDPUSH XL Class: Cmt Vol: 50.0 (bbl) Density: 10.50 (ppg) Yield: (ft'/sk) Slurry Vol: (sk) Water Vol: (bbl) Other Vol: 0 Purpose: SPACER Mix Water: (gal) Foam Job: N Test Data Thickening Time: Free Water: (%) Fluid Loss: (cc) Fluid Loss Pressure: ("F) Temperature: ("F) Temperature: (OF) Temperature: ("F) Time Compressive Strength 1: Compressive Strength 2: Temp (OF) (OF) Pressure (psi) (psi) Stage No: 1 Slurry No: 3 of 4 Slurry Data Fluid Type: LEAD Slurry Interval: 2,722.00 (ft¡ro: 36.75 (ft) Water Source: Description: ASLite Cmt Vol: 405.0 (bbl) Slurry Vol:531 (sk) Test Data Thickening Time: Free Water: (%) Fluid Loss: (cc) Fluid Loss Pressure: ("F) Temperature: ("F) Temperature: (OF) Temperature: (OF) Class: G Density: 1050 (ppg) Yield: 4.28 (ft3/sk) Water Vol: 245.0 (bbl) Other Vol: () Purpose: FILLER CEM Mix Water: 19.39 (gal) Foam Job: N Time Compressive Strength 1: Compressive Strength 2: Temp (OF) (OF) Pressure (psi) (psi) Trade Name Stage No: 1 Slurry No: 3 of 4 - Additives Units 0-53 0-46 0-79 S1 0-124 0-44 0-65 Type GYPSUM DEFOAMER EXTENDER ACCELERATOR FILLlTE ACCELERATOR DISPERSANT Concentration Units 30.00 %BWOC 0.60 %BWOC 1.50 %BWOC 1.50 %BWOC 43.10 %BWOC 9.00 %BWOW 0.50 %BWOC Liquid Cone. Printed: 8/16/2005 6:59:27 AM e Ie ConocoPhillipsAlaska Cementing Report Legal Well Name: CD2-18 Common Well Name: CD2-18 Event Name: ROT - DRILLING Slurry Data Fluid Type: TAIL Slurry Interval: 2,722.00 (ft)To: Water Source: Test Data Thickening Time: Free Water: (%) Fluid Loss: (cc) Fluid Loss Pressure: CF) Trade Name 0-46 0-65 S1 Casing Test Test Press: 2,500 (psi) For: 30 (min) Cement Found between Shoe and Collar: N Report #: Start: 1 9/8/2003 Stage No: 1 Slurry No: 4 of 4 Description: 3,222.00 (ft) Cmt Vol: 47.5 (bbl) Slurry Vol:234 (sk) Temperature: (OF) Temperature: CF) Temperature: (OF) Class: G Density: 15.80 (ppg) Yield: 1.16 (ft'/sk) Water Vol: 28.4 (bbl) Other Vol: 0 Time Compressive Strength 1: Compressive Strength 2: Stage No: 1 Slurry No: 4 of 4 - Additives Type DEFOAMER DISPERSANT ACCELERATOR Shoe Test Pressure: (ppge) Tool: N Open Hole: (ft) Hrs Before Test: Log/Survey Evaluation CBL Run: N Under Pressure: (psi) Bond Quality: Cet Run: N Bond Quality: Temp Survey: N Hrs Prior to Log: Concentration Units 0.20 %BWOC 0.30 %BWOC 2.00 %BWOC Liner Lap: Pos Test: (ppge) Neg Test: (ppge) Hrs Before Test: Cement Found on Tool: N Interpretation Summary Cement Top: (ft) How Determined: TOC Sufficient: N Job Rating: If Unsuccessful Detection Indicator: Remedial Cementing Required: N Number of Remedial Squeezes: Page 3 of 3 Spud Date: 9/8/2003 Report Date: 9/8/2003 End: 9/23/2003 Purpose: SHOE INTEG Mix Water: 5.10 (gal) Foam Job: N Temp (OF) CF) Pressure (psi) (psi) Liquid Cone. Units Liner Top Test Tool: N Tool: N Printed: 8/16/2005 6:59:27 AM ConocoPhilUps Alaska,ll'1c. Daily Drilling Report I JOB NUMBER I EVENT COOE 124 HRS PROG TMD I TVD I DFS CD2-18 ODR I 3,233.0 I 2,352.0 4.00 I RIG NAME & NO. I FIELD NAME I OCS NO. AUTH MD I DAILY TANG Doyon Drilling Inc 19 ALPINE 16,661.0 0 ACCIDENTS LAST 24 HRS. ? DAILY INT WIO MUD 24 HR FORECAST DATE OF LAST SAFETY MEETING DAILY TOTAL N/U test BOPE. P/U d"f' and BHA RIH 317,322 LITHOLOGY JAR HRS OF SERVICE I BHA HRS SINCE INSP I LEAKOFF AFE 10030338 LAST SURVEY: DATE TMD INC AZIM I LAST CASING I NEXT CASING 9/7/2003 3,189.33 53.510 271.880 9.625 (in) @ 3,221.0 (ft) 7.000 (in) @ 11,964.0 (ft) DENSITY(ppg) 9.80 PP I ECD !MUDDATA DAILY COST 0 CUM COST I FV I PVIYP GELS I WUHTHP I FCIT.SOL OIUWAT I %Sand/MBT I Ph/pM Pf/Mf CI 4cOa II H2S 200 22/61 39/62 8.81 31 I 0.5/25.0 8.31 0.01/0 BHA NO. 1 BHA I HOLE CONDITIONS BIT NO. 1 BHA WT. BELOW JAR$ $TRING WT. UP STRING WT. DN I STRING WT; ROT TORQUE / UNITS BHA LENGTH 978.08 ITEM DESCRIPTION NO JTS LENGTH O.D. I.D. CONN SIZE CONN TYPE 1 1.10 12.250 3"750 1 30.78 8.000 5250 1 2.23 8.000 2.813 1 2.52 8.000 3.000 1 9.20 7.920 1.900 1 8.89 7.950 1.900 1 9.97 8.170 1.900 1 2.88 8.050 2.813 1 5.79 8.150 2.875 1 31.03 8.100 2"810 1 31.01 8.100 2.810 1 31.05 8.100 2.810 1 1.98 8.000 2.880 3 89.70 5.000 3"000 1 32.80 6.375 2.750 23 687.15 5.000 3.000 BIT OPERATIONS RPM I GPM I PRESS I P BIT I HRS I 24HrDIST I 24Hr ROP I CUM HRS I CUM DEPTH I CUM Rap OPERATIONS SUMMARY PHASE DESCRIPTION SURFAC Stand back hwdp and jars to 168' SURFAC Stand back d.c"'s and UD stabilizer, UBHO, Download MWD, Break bit and adjust motor back to O. UD MWD tools and clear floor SURFAC R/U casers and hold pre-job safety meeting SURFAC RIH wI 9-5/8" 36#, J-55, BTC csing to 749' wI insufficient returns. CBU RIH to 877' wI no returns and taking wt. POOH to 833' and circulate down to 876'. Run casing to 920' wI no returns" Break circulation and wash casing to 1051 wI good returns" RIH to 1656' e WELL NAME SUPERVISOR G.R. Whitlock CURRENT STATUS N/U BOPE Bit Mud Motor Sub - Float Crossover MWD MWD MWD Sub - Bottom Hole Orienting Stabilizer - NonMag Drill Collar - Non Mag Drill Collar - Non Mag Drill Collar - Non Mag Crossover Drill Pipe - Heavy Wgt Jars Drill Pipe - Heavy Wgt BIT / RUN I 1 I 1 SIZE I MANUF. I TYPE 12.250 HUGHES-CHR MX-C1 BIT / RUN WOB FROM TO HOURS CODE TROUBLE SUB 00:00 00:15 0.25 DRILL P TRIP 00:15 02:45 2.50 DRILL P TRIP 02:45 04:15 1.50 CASE P RURD 04:15 09:00 4.75 CASE P RUNC e Page 1 of 2 I REPT NO. I DATE 5 I 9/8/2003 ¡CUM. TANGO CUM INTANG WI MUD o o CUM COST WI MUD 705,221 AUTH. LAST BOP PRES TEST o I LIME I ES BITS I SERIAL NO, 6016810 JETS OR TFA 12/16/16/1811 DEPTH IN DATE IN I I-O-D-L-B-G-O-R 114.0 9/4/200~ 2-3-WT -G-E-I-PN- TD Printed: 8/1612005 6:58:42 AM WELL NAME CD2-18 e e Page 2 of 2 ConocoPhillips Alaska, Inc. Daily Drilling Report I JOB NUMBER I EVENT CODE 124 HRS PROG I TMD I ODR 3,233.0 FROM TO HOURS CODE TROUBLE SUB 09:00 09:30 0.50 CASE P CIRC 09:30 12:00 2.50 CASE P RUNC 12:00 12:30 0.50 CASE P RUNC 12:30 15:00 2.50 CASE P CIRC 15:00 16:30 1.50 CEMENT P PUMP 16:30 17:30 1.00 17:30 18:30 18:30 19:30 19:30 21:00 21 :00 00:00 1"00 1.00 1.50 3"00 CEMENT P CASE P CASE P WELCTL P RIGMNT P DISP DEQT RURD NUND RGRP ITVD IDFS 2,352.0 4.00 I REPT NO. I DATE 5 9/8/2003 OPERATIONS SUMMARY PHASE DESCRIPTION SURFAC CBU @ 4 bpm-280 psi SURFAC Continue running 9-5/8" casing to 2845' wI good returns SURFAC Continue running 9-5/8" casing to 3182' M/U landing jt and landi casing @ 3221'. UD fillup tool and blowdown topdrive. RlU cement head SURFAC Circ and condition mu(j while reciprocating casing. PU=170k, S/O=125k. 5 bpm @ 230 psi. Hold safety meeting SURFAC Pump 40 bll viscosified water wI nutplug wI rig pump. Pump 5 bbl water wI dowell and test lines to 2500 psi. Drop bottom plug" Dowell pumped 40 bbl mud push @ 10"5 ppg 405 bbllead @ 10.7 ppg, and 48 bbl tail @ 15"8 ppg. Dropped top plug SURFAC Dowell pumped 20 bbl water. Pumped 222 bbl mud wI rig pump and bumped plug wI 1050 psi @ 17:08 hrs. Good returns throughout job" Circulated 225 bbl slurry to surface. SURFAC Check floats-OK. RlU and pressure test casing to 2500 psi for 30 min.-OK SURFAC RID casers. UD landing jt Flush out surface riser SURFAC N/D surface riser. N/U unihead. cIa bales and top drive saver sub SURFAC Change out mud cross on BOP's" N/U BOPE 24 HR SUMMARY: Run 9-5/8" surface casing to 3221'. Circulate and condition mud. Cement wI 405 bbl Lead and 48 bbl Tail. Pressure test casing. N/D riser and N/U BOPE COMPANY Arctic Catering Inc. Doyon Drilling Inc Dowell Fairweather E&P Service Halliburton - Sperry-Sun ITEM Fuel Water, Drilling RESERVOIR NAME CD2-23 UNITS gals bbls ICD2-18 SERVICE USAGE 1,225 1,430 PERSONNEL DATA NO. HOURS COMPANY 5 Halliburton - Sperry-Sun 26 M-I Drilling Fluids 2 Swaco 1 FMC Corporation Wellhe 2 PES I - Petroleum Equip SERVICE NO. HOURS 3 3 4 1 1 MATERIALS I CONSUMPTION ON HAND ITEM -3,946 Water, Potable -6,530 USAGE 90 ON HAND -280 UNITS bbls RESERVOIR AND INTERVAL DATA ZONE I TOP I BASE I 1615 3"8 1140 COMMENTS Printed: 8/16/2005 6:58:42 AM PRESSURE INTEGRITY TEST CONOCOPHILLlPS Alaska, Inc. Well Name: CD2-18 I Ri9: Doyon 19 Date: I 8/28/2003 I Volume Input Volume/Stroke Pump Rate: Drilling Supervisor: Don Mickey pump used: I #2 Mud Pump 1"'1 Strokes I... 0.08401 Bbls/Strk \... 0.51 Bbl/min 1..- Type of Test: I Casing Shoe Test LOT/FIT 1.1 Pumping down I annulus and DP. I· Casing Test Pressure Integrity Test Hole Size: 18-1/2" \..., Casing Shoe Depth II Hole Depth Pumping Shut-in Pumping Shut-in RKB-CHFd 36.71Ft 3,221 I Ft-MDI 2,3851 Ft-TVD 3,253IFt-MD I 2,401IFt-TVD Strks psi Min psi Strks psi Min psi Casina Size and Description: \9-5/8" 36#/Ft J-55 BTC 1.1 0 0 0 2525 0 0 0 790 Casina Test Pressure IntearitvTest 2 25 1 2525 1 10 0.25 785 Mud Weight: 9.8 ppg Mud Weight: 9.6 ppg 4 50 2 2525 2 40 0.5 785 Mud 10 min Gel: 14"0 Lb/100 Ft2 Mud 10 min Gel: 12.0 Lb/100 Ft2 6 150 3 2525 3 100 1 785 Test Pressure: 2,500 psi Rotating Weight: 120,000 Lbs 8 300 4 2525 4 160 1.5 770 Rotating Weight: 75,000 Lbs Blocksffop Drive Weight: 75,000 Lbs 10 425 5 2525 5 240 2 76" Blocksffop Drive Weight: 75,000 Lbs Desired PIT EMW: 16.0 ppg 12 650 6 2525 6 320 2.5 76'- Estimates for Test: 2.3 bbls Estimates for Test: 794 psi 0.7 bbls 14 800 7 2525 7 390 3 760 ¡"'l 1...\ 16 950 8 2525 8 460 3.5 755 EMW = Leak-off Pressure + Mud Weight = 800 PIT 15 Second 18 1025 9 2525 9 530 4 750 0.052 x TVD 0.052 x 2385 + 9.6 Shut-in Pressure, psi 20 1200 10 2525 10 610 4.5 750 EMW at 3221 Ft-MD (2385 Ft-TVD) = 16.1 ppg 785 22 1350 15 2500 11 670 5 750 - Lost 25 psi during test, held 99% - 24 1475 20 2500 12 740 5.5 750 = of test pressure. - 26 1600 25 2500 13 800 6 745 .......4~J 1.-1-. ;~ ~~~~ 30 2500 6.~ ~:~ 32 2050 7.5 740 34 2250 8 740 36 2400 8.5 735 37 2525 9 735 9.5 735 10 735 e 3000 - 2500 2000 -- w 0:: ::J U) 1500- U) W 0:: Q, 1000 - 500 - Comments: ~ / o o ~_.~ 2 3 Barrels 4 0 5 10 15 20 25 30 Shut-In time, Minutes o PIT Point Vo ume Pumped 1.1 Bbls Volume Bled Back 3.7ltsbls Vo ume Bled Back Il::Sbls Volume Pumped 3.1 Bbls .....CASING TEST _LEAK-OFF TEST Tested casing after bumping plugs and checking floats on cement job. Changed over to new LSND mud prior to PIT. e e Casing Detail 7" Intermediate Casinq ConocoPhillips Alaska Jt Number Num of Jts COMPLETE DESCRIPTION OF EQUIPMENT RUN Doyon 19 RKS to LDS FMC 11" X 7" Hanger Jts 3 to 282 280 Jts 7" 26# L-BO STCM Csg 7" Weatherford Float Collar Jts 1 to 2 2 Jts 7" 26# L-80 STCM Csg 7" Ray Oil Tools Float Shoe(Silver bullet) 7" Shoe @ 12,112' TD of 8·1/2" hole @ 12,124' Total Centralizers: 61 Straight blade centz" one per jt on jts # 1-12,14,16,18,20,22,24,26,28,30,32 Straight blade centralizer one per jt on jts. # 207,208,& 209 21 0212,214,216,218,220,222,224,226,228,230,232,234,236,238,24C 244,246,248,250,252,254,256,258,260,262,264,266 ,268 ,270 ,272 ,27 ¿ 278, & 280 ' 295 joints in pipe shed - 282 total jts. to run! last 13 joints stay out Top of Alpine C 11,958' MD - 7249' TVD Use Best-o-Life 2000 pipe dope Drifted to 6.151" MU Torque 7,200 ftllb Remarks"' Up Wi =325 K On Wi =140 K Block Wt=75 K Supervisor: Don Mickey Well: CD2-18 Date: 09/1 LENGTH 34.60 1.67 11987.58 1"33 84.78 2.07 DEPTH TOPS 34.60 36.27 12023.85 12025.18 12109.96 12112.03 ConocoPhillips Alaska Casing Report Page 1 of2 Report #: Start: Spud Date: 9/8/2003 Report Date: 9/14/2003 End: 9/23/2003 Legal Well Name: CD2-18 Common Well Name: CD2-18 Event Name: ROT - DRILLING 2 9/8/2003 General Information Permanent Datum: KB-Datum: CF E!evation: Mud Lost: Hole TMD: Str Wt on Slips: ,Max Hole Angle: Days From Spud: e Kelly Bushing 52.00 (ft) (ft) (bbl) Hole Size: Water TMD: Liner Overlap: KB to Cutoff: 8.500 (in) (ft) (ft) 34.60 (ft) String Type: Production Casing Hole TVD: 7,272.0 (ft) Ground Level: 15.90 (ft) Circ Hours: 2,,50 (hr) Manufacturer: FMC Hanger Model: 12,124.0 (ft) (Ibs) 82.69 n 10"00 (days) Casing Flange I Wellhead Model: Horizontal U Packoff Model: Top Hub/Flange: (in) / 5,000 (psi) BTM Hub/Flange: (in) / 5,000 (psi) Actual TMD Set: 12,112"03 (ft) Item Casing Hanger Casing Float Collar Casing Float Shoe Centering Guides Integral·Casing Detail Size Weight Grade Drift Threads JTS Length Top MU Torq. THD Manufacturer Model (in.) (Ib/ft) (in) (ft) (ft) (ft-Ibf) 7.000 26.00 1.67 34.60 FMC 7.000 26,00 L-80 6151 BTC-MOD 280 11,987.58 36.27 7.000 26"00 L-80 6.151 BTC-MOD 1,33 12,023,85 Y WEATHERFORD 7"000 26.00 L-80 6,151 BTC-MOD 2 84.78 12,025.18 Y 7.000 26,00 L-80 BTC-MOD 2.07 12,109.96 Y RAY OIL TOOLS Non-Integral Casing Accessories Condo Max o.D Min ID Compo Name (in) (in) Casing Hanger 6.276 7" 26# L-80 Cas Float Collar 6.276 7" 26# L-80 Cas Float Shoe e Accessory Spacing (ft) Bottom (ft) 12,068,0 Floating Interval 122,0\ Manufacturer Number How Fixed Top (ft) RAY OIL TOOLS 61 Remarks Run 7" 26# L-80 MBTC casing as follows: FS (Ray Oil Tool Silver bullet) 2 jts. - FC (Weatherford) - 2 jts. (first 4 connectioins BakerLoc - fill pipe & check floats on jt # 4) 71 jts. to 3207"71' (75 jts. total) Break circulation & circulate casing capacity - 4 bbls I min @ 240 psi - PU wt. 135 SO wt 115 Continue running 7" 26# L-80 MBTC casing - f/ 3207' to 8123.56' - 190 jts" total Break circulation & circulate btms up - Start 4 bbls/min @ 630 psi Printed: 8/16/2005 6:59:53 AM ConocoPhillips Alaska Casing. Report Legal Well Name: CD2-18 Common Well Name: CD2-18 Event Name: ROT - DRILLING 2 9/8/2003 Spud Date: 9/8/2003 Report Date: 9/14/2003 End: 9/23/2003 Report #: Start: Remarks Continue circulating btms up @ 8123' @ 4 bbls/min @ 410 psi final PU 250 SO 145 . Continue to.wn7" casingfl 8123' to 10,697' (250 jts total) full returns whiie running pipe Break circulation & circulate btms up + @ 10,697' 4 bbls/min @ 580 psi PU 325 SO 150 Finish running 7" casing fl 10,697' to 12,075' (282 jts. total ran) PU hanger & landing jt. - Land casing in wellhead on FMC fluted hanger wi shoe @ 12,112' & FC @ 12,094' SO wt 145 Installed centering guides on jts" 1-12 then ever other jt. fl # 14 to # 32 then jts. # 207,208,&209 then every other jt fl # 212 to # 208 - 61 total Page 2 of 2 e e Printed: 8/16/2005 6:59:53 AM e ConocoPhillips Alaska Cementi ngReport Legal Well Name: CD2-18 Common Well Name: CD2-18 Event Name: ROT - DRILLING Primary Hole Size: 8.500 (in) TMD Set: 12,112 (ft) Date Set: 9/15/2003 Csg Type: Production Casing Csg Size: 7.000 (in.) Cmtd. Csg: Production Casing Cement Co: Dowell Schlumberger Rot Time Start: Rec Time Start: Time End: Time End: Type: Cement Casing Volume Excess %: 60.00 Meas. From: N/A Time Circ Prior To Cementing: 2.00 Mud Circ Rate: 210 (gpm) Mud Circ Press: 700 (psi) Report #: Start: 2 9/8/2003 Cement Job Type: Primary Squeeze Open Hole Hole Size: sa TMD: (ft) sa Date: sa Type: Cmtd. Csg: Squeeze Casing Hole Size: TMD Set: Date Set: Csg Type: sa TMD: sa Date: Cmtd. Csg: I e Page 1 of 3 Spud Date: 9/8/2003 Report Date: 9/15/2003 End: 9/23/2003 Plug Hole Size: Top Set: (ft) BTM set: (ft) Plug Date: Plug Type: Drilled Out: Cmtd" Csg: , Cementer: Steve doughten Pipe Movement Pipe Movement: No movement RPM: SPM: Init Torque: Stroke Length: (ft-Ibf) (ft) Avg Torque: (ft-Ibf) Drag Up: (Ibs) Stage No: 1 of 1 Start Mix Cmt: 09:10 Start Slurry Displ: 09:10 Start Displ: 09:20 End Pumping: 10:41 End Pump Date: 9/15/2003 Top Plug: Y Bottom Plug: Y Type: Non-Disp. LS Density: 9.6 (ppg) Vise: 41 (s/qt) Bottom Hole Circulating Temperature: (OF) Displacement Fluid Type:Mud Slurry Data Fluid Type: FLUSH Slurry Interval: (ft) Water Source: Test Data Thickening Time: Free Water: (%) Fluid Loss: (cc) Fluid Loss Pressure: (OF) Disp Avg Rate: Disp Max Rate: Bump Plug: Press Prior: Press Bumped: Press Held: Float Held: 5.50 (bbl/min) 7.00 (bbl/min) Y 790 (psi) 1,240 (psi) 10 (min) Y Max Torque: (ft-Ibf) Drag Down: (Ibs) Returns: 100 Total Mud Lost: Cmt Vol to Surf: 36"00 (bbl) (bbl) Mud Data Ann Flow After: N Mixing Method: Density Meas By: densemeter PV/yP: 8 (cp)/18 (lb/100ft2) Gels 10 see: 8 (lb/100ft2) Gels 10 min: 12 (lb/100ft2) Bottom Hole Static Temperature: (OF) Density: 9.6 (ppg) Volume: 457"00 (bbl) Stage No: 1 Slurry No: 1 of 3 To: (ft) Description: CW100 Cmt Vol: 20.0 (bbl) Slurry Vol: (sk) Temperature: ("F) Temper3ture: ("F) Temperature: (OF) Density: 7.30 (ppg) Water Vol: (bbl) Class: Yield: (ft3/sk) Other Vol: 0 Time Compressive Strength 1: Compressive Strength 2: Purpose: Flush Mix Water: (gal) Foam Job: N Temp ("F) ("F) Pressure (psi) (psi) Printed: 8/16/2005 6:59:38 AM e Legal Well Name: CD2-18 Common Well Name: CD2-18 Event Name: ROT - DRILLING Slurry Data Fluid Type: Spacer Slurry Interval: (ft) Water Source: Test Data Thickening Time: Free Water: (%) Fluid Loss: (cc) Fluid Loss Pressure: (OF) Slurry Data Fluid Type: PRIMARY Slurry Interval: 12,112.00 (ff):>: Water Source: Test Data Thickening Time: Free Water: (%) Fluid Loss: (cc) Fluid Loss Pressure: (OF) Trade Name D-46 D-65 D167 EX920 e ConocoPhillipsAlaska Cementing RepOrt Report #: Start: 2 9/8/2003 Stage No: 1 Slurry No: 20f 3 Page 2 of 3 Spud Date: 9/8/2003 Report Date: 9/15/2003 End: 9/23/2003 To: (ft) Description: MUDPUSH XL Class: Cmt Vol: 50.0 (bbl) Density: 12.50 (ppg) Yield: (ft3/sk) Slurry Vol: (sk) Water Vol: (bbl) Other Vol: 0 Temperature: ("F) Temperature: ("F) Temperature: (OF) Time Compressive Strength 1: Compressive Strength 2: Stage No: 1 Slurry No:30f 3 Description: 10,776.00 (ft~mt Vol: 54.0 (bbl) Slurry Vol:252 (sk) Temperature: (OF) Temperature: (OF) Temperature: ("F) Temp (OF) (OF) Class: G Density: 15"80 (ppg) Yield: U6 (ft3/sk) Water Vol: 30"8 (bbl) Other Vol: 0 Time Compressive Strength 1: Compressive Strength 2: Stage No: 1 Slurry No: 3 of 3 - Additives Type DEFOAMER DISPERSANT Concentration 0.20% 0.25 % OAO% 0.02% Units Temp (OF) (OF) Liquid Conc. Purpose: SPACER Mix Water: (gal) Foam Job: N Pressure (psi) (psi) Purpose: PRIMARY Mix Water: (gal) Foam Job: N Pressure (psi) (psi) Units Printed: 8/16/2005 6:59:38 AM e e ConocoPhillipsAlaska Cementing Report Legal Well Name: CD2-18 Common Well Name: CD2-18 Event Name: ROT - DRILLING Report #: Start: 2 9/8/2003 Casing Test Shoe Test Test Press: 3,500 (psi) For: 30 (min) Cement Found between Shoe and Collar: N Pressure: (ppge) Tool: N Open Hole: (ft) Hrs Before Test: Liner Lap: Pos Test: (ppge) Neg Test: (ppge) Hrs Before Test: Cement Found on Tool: N Log/Survey Evaluation Interpretation Summary CBL Run: N Under Pressure: (psi) Bond Quality: Cet Run: N Bond Quality: Temp Survey: N Hrs Prior to Log: Cement Top: (ft) How Determined: TOC Sufficient: N Job Rating: If Unsuccessful Detection Indicator: Remedial Cementing Required: N Number of Remedial Squeezes: Remarks Page 3 of 3 Spud Date: 9/8/2003 Report Date: 9/15/2003 End: 9/23/2003 Liner Top Test Tool: N Tool: N Cement T' casing as follows: Pumped 5 bbls CW100 - Test lines to 3500 psi - Pumped 15 bbls Cw100 @ 7.32 ppg 5 bbls/min @ 680 psi - Pumped 50.5 bbls Mud Push XL 12.75 ppg @ 6 bbls/min @ 600 psi - Dropped bottom plug - Mix & pumped 54 bbls Class G wi 0.2% 046,0.25% 065, 0.40% 0167, .02% XE902 @ 15.8 ppg 5.5 bbls/min @ 470 psi - Dropped top plug wi 20 bbls water fl Dowell- Switched to rig pumps & displaced wi 438 bbls 9.6 ppg LSND mud @ 7 to 3.5 bbls/min @ 340 to 790 psi - bumped plug wi 1240 psi - CIP @ 1041 hrs" Check floats OK Full retums while pumping jOb - unable to move pipe during jOb - lost approx. 36 bbls during job Printed: 8/1612005 6:59:38 AM e e Page 1 of 2 WELL NAME ConocoPhilHpsAlaska,ll1c. Daily DrilUngReport I JOB NUMBER I EVENT CODE 1124 HRS PROG TMD I TVD I DFS CD2-18 ODR 12,124"0 7,272.0 10.00 I RIG NAME & NO. I FIELD NAME I OCS NO. AUTH MD I DAlL Y TANG Doyon Drilling Inc 19 ALPINE 16,661.0 0 ACCIDENTS LAST 24 HRS. ? DAILY INT WIO MUD II REPT NO. I DATE 11 9/14/2003 ICUM. TANGO CUM INTANG WI MUD SUPERVISOR Don Mickey CURRENT STATUS Land 7" csg - RU to Circulate o o CUM COST WI MUD 1,727,236 Bit Geo Pilot NM Pony Collar IB NM Stabilizer MWD-RLL,DGR,EWR,PWD IB NM Stabilizer MWD-HCIM MWD-HOC MWD-HOC NM Float Sub 3-NM Flex DC's IB NM Stabilizer 3 HWDP Drilling Jar - DNT 11 HWDP 24 HR FORECAST Cmt 7" csg - Test BOPE - MU 61/8" BHA - RIH LITHOLOGY I JAR HRS OF SERVICE I BHA HRS SINCE INSP I LEAKOFF AFE 16.06 10030338 LAST SURVEY: DATE TMD INC AZIM I LAST CASING I NEXT CASING LAST BOP PRES TEST 9/13/2003 12,046"34 82.690 325.460 I 9.625 (in) @ 3,221.0 (ft) 7"000 (in) @ 12,112.0 (ft) 9/9/2003 DENSITY(ppg) I 9.60 I PP I 1 ECD 111.821 MUD DATAl DAILYCOST I 0 I CUM COST I 0 FV I PVIYP I GELS I WUHTHP I FCfT.SOL I OILlWAT I %SandIMBTI Ph/pM Pf/Mf CI I 4cOa I H2S I LIME I ES 44 8/26 14/16 4.6/10.0 11 I 0.2/13.8 9.11 0.1010 BHA NO. I 2 I BHA I HOLE CONDITIONS BIT NO. 1 2 BHA WT. BELOW JARS I STRINGWT. UP STRING WT" DN I STRING WT" ROT TORQUE / UNITS BHA LENGTH 1,504.59 ITEM DESCRIPTION NO JTS LENGTH O.D. I.D. CONN SIZE CONN TYPE 1 1.60 8.500 3.000 1 20.06 7.625 1"900 1 9.16 6.750 2.810 1 1.96 6"750 2.750 1 20.96 6.700 1 "900 1 221 6.750 2.750 1 6"95 6.750 1.900 1 9.03 6.750 1.900 1 9.75 6.750 1 "900 1 1.44 6.700 2.875 3 91.21 6.500 2.800 1 5.46 6.880 2.813 3 89.70 5"000 3.000 31.97 6.200 2"300 329.43 5.000 3.000 1.42 6.380 2.630 63.75 4.000 3.240 6.95 5.280 2.190 794.65 4.000 3.240 6.93 5.270 2" 190 DATE OF LAST SAFETY MEETING DAILY TOTAL 139,330 AUTH. Crossover 11 1 2 1 25 1 2 Jts Drill Pipe Weatherford Ghost Reamer 25 Jts Drill Pipe Weatherford Ghost Reamer BIT/RUN I 2 I 2 BITS SIZE I MANUF. 1 TYPE I SERIAL N°'1 8.500 I SECURITY-DB~FSF2463 10566703 JETS OR TFA 15/15/15/15/151 DEPTH IN DATE IN I I-O-D-L-B-G-O-R 3,233"0 9/9/200~ 2-2-BT -A-1-I-EC- TO BIT / RUN WOB BIT OPERATIONS RPM I GPM 1 PRESS 1 P BIT 1 HRS I 24Hr DIST 24Hr ROP I CUM HRS 1 CUM DEPTH 1 CUM ROP FROM TO 00:00 02:30 HOURS 2.50 CODE DRILL P TROUBLE SUB CIRC OPERATIONS SUMMARY PHASE INTRM1 DESCRIPTION DRI LL P TRIP Circulate Hi-vis sweep - circ hole clean wI 3X btms. up - standing back 1 std every 30 mins. fl 11.904' to 11,523' wI 550 gpm @ 2820 psi wI 120 rpm's POOH on trip tank to 11,495' - pulling tight - MU top drive - pump out to 11,045' - switch over & POOH on trip tank to 7227' - work through tight spots 02:30 06:15 3.75 INTRM1 Printed: 8116/2005 6:59:07 AM e e Page 2 of 2 CD2-18 ConocoPhillips Alaska, Inc. Daily Drilling Report I JOB NUMBER I EVEN aT DC RODE 124 HRS PROG I TMD I TVD 12,124.0 7,272.0 IDFS 10.00 IREPT NO. I DATE 11 9/14/2003 WELL NAME OPERATIONS SUMMARY FROM TO HOURS CODE TROUBLE SUB PHASE DESCRIPTION 02:30 06:15 3.75 DRILL P TRIP INTRM1 @ 11,096' & 11,072' - average drag 5 to 10 over 06:15 06:30 0.25 DRILL P CIRC INTRM1 Pump dry job - blow down top drive 06:30 08:00 150 DRILL P TRIP INTRM1 Continue POOH on TT f/ 7227' to 2931' - 5 to 10 drag - proper hole fill 08:00 08:15 0.25 DRILL P RIRD INTRM1 Remove GeoPilot skid f/ rig floor - monitor well on TT 08:15 09:45 1.50 DRILL P TRIP INTRM1 Continue to POOH - LD ghost reamers - change handling equipment to 5" - std back HWDP & jars 09:45 12:00 2.25 DRILL P PULD INTRM1 Handle BHA - LD stab - std back NM flex DC's - Down load MWD & service GeoPilot - LD bit - GeoPilot - remove pulser & LD MWD - clean up rig floor 12:00 12:30 0.50 DRILL P OTHR INTRM1 PU stack washer & flush BOP stack 12:30 14:30 2.00 WELCTL P EQRP INTRM1 Pull wear bushing - set test plug - Change top pipe rams to 7" & test to 250 & 5000 psi - pull test plug & set thin wall wear bushing 14:30 15:30 1.00 CASE P RURD INTRM1 RU to run 7" casing - Held PJSM 15:30 18:30 3.00 CASE P RUNC INTRM1 Run 7" 26# L-80 MBTC casing as follows: FS (Ray Oil Tool Silver bullet) 2 jts. - FC (Weatherford) - 2 jts. (first 4 connectioins BakerLoc - fill pipe & check floats on jt # 4) 71 jts. to 3207"71' (75 jts. total) 18:30 19:00 0.50 CASE P CIRC INTRM1 Break circulation & circulate casing capacity - 4 bbls / min @ 240 psi - PU wt. 135 SO wt 115 19:00 23:00 4.00 CASE P RUNC INTRM1 Continue running T' 26# L-80 MBTC casing - f/ 3207' to 8123.56' - 190 jts. total 23:00 00:00 1.00 CASE P CIRC INTRM1 Break circulation & circulate btms up - Start 4 bbls/min @ 630 psi 24 HR SUMMARY: Circulate hole clean - pump out to 11,045' - POOH on TT - hole in good condition - LD BHA - RU RU & run 7" casing - Run casing to 8123 (190 jts,) Circ @ 3207' & 8123' COMPANY Arctic Catering Inc" Doyon Drilling Inc Dowell Fairweather E&P Service Halliburton - Sperry-Sun SERVICE PERSONNEL DATA NO. HOURS COMPANY 5 Halliburton - Sperry-Sun 26 M-I Drilling Fluids 2 Swaco 1 FMC Corporation Wellhe 2 SERVICE NO. HOURS 2 3 4 1 ITEM UNITS gals bbls USAGE 1 ,425 450 MATERIALS I CONSUMPTION ON HAND ITEM -12,040 Water, Potable -12,670 UNITS bbls USAGE 120 ON HAND -1,000 Fuel _Water, Drilling RESERVOIR NAME CD2-23 ICD2-18 RESERVOIR AND INTERVAL DATA ZONE I TOP I BASE I 612 3.5 1280 COMMENTS Printed: 8/16/2005 6:59:07 AM PRESSURE INTEGRITY TEST CONOCOPHILLlPS Alaska, Inc. Well Name: CD2-18 I Rig: I Doyon 19 I Date: I 9/15/2003 I Volume Input Pump Rate: Drilling Supervisor: Don Mickey Pump used: I Cement Unit I· _~ Barrels I... 1 Bbls/Strk I... 0.51 Bbl/min I... Type of Test: I Annulus Leak Off Test for Disposal Adequacy 1...1 Pumping down I annulus. I'" 'I. CasinR Test Pressure Integrity Test Hole Size: 18-1/2" 1",\ Casing Shoe Depth II Hole Depth Pumping Shut-in Pumping Shut-in RKB-CHFd 36.71Ft 3,221 1Ft-MOl 2,3851 Ft-TVD 10,776IFt-MD I 6,846IFt-TVD Bbls psi Min psi Bbls psi Min psi Casina Size and Description: 19-5/8" 36#/Ft J-55 BTC 1",1 0 0 0 515 .Chanqes for Annular Adequacy Test Pressure IntearityTest 0.5 98 0.25 488 Juter casing shoe test results in comments Mud Weight: 9.6 ppg 1 155 0.5 479 Description references outer casing string. Inner casing 00: 7.0 In. 1.5 208 1 464 ìize is that drilled below outer casing. 2 263 1.5 44_ ¡timated TOC for Hole Depth. 2.5 299 2 435 Enter inner casing 00 at right Desired PIT EMW: 14"5 ppg 3 345 2.5 424 Estimates for Test: 608 psi 0.6 bbls 3.5 381 3 408 1",1 4 415 3.5 405 4.5 437 4 400 5 472 4.5 391 5.5 500 5 384 6 541 5.5 378 6.5 596 6 372 7 625 6.5 367 7.5 607 7 362 8 600 7.5 357 8.5 576 8 352 9 564 8.5 347 9.5 515 9 343 9.5 338 10 33_ EMW = Leak-off Pressure + Mud Weight = 625 + 9 6 0.052 x TVD 0.052 x 2385 . EMW at 3221 Ft-MD (2385 Ft-TVD) = 14.6 I",l PIT 15 Second Shut-in Pressure, psi 488 1000· w 0:: :::I tJ) 500 . tJ) w 0:: 0.. -- ~ J~ ..?I ~ - ~\~...)~~J A~~ ~h~ .,..., Q.:<, 'F\-\ \.\)'- Æf2?t1 'SA) 2 3 4 5 Barrels 6 7 8 9 10 0 5 Shut-In time, Minutes o PIT Point 10 Volume Pumped 0.0 Bbls Volume Bled Back IBbls Volume Pumped 9.5 Bbls Vo ume Bled Back IBbls .....CASING TEST -LEAK-OFF TEST Comments: 9-5/8" casing shoe tested to 16.1 ppg EMW when drilled out. ~ 3, ð :;t- DATA SUBMITTAL COMPLIANCE REPORT 12/5/2005 Permitto Drill 2031510 Well NamelNo. COLVILLE RIV UNIT CD2-18 Operator CONOCOPHILLlPS ALASKA INC MD 18019"- TVD Completion Date 9/23/2003" Completion Status 7215 ",.. - -------------.'- - - -----------~--_._- ------,.--"........--------.---. REQUIRED INFORMATION Mud Log No Samples No DATA INFORMATION Types Electric or Other Logs Run: GR/Res Well Log Information: Log/ Electr Data Digital Dataset ~~e~~rmt Number Name fJi!I' C Lis 12602 InductionlResistivity vfi D.J.óIs US t12203 Induction/Resistivity ]1 ED 0 -bói.s\.\~ 12203 Rate of Penetration Rpt Directional Survey Rpt Directional Survey Log Log Run Scale Media No 1Rpt fPt Log - h. t S (u·;~I¡¡rfIl...tÏiXIIlWii"tiVity Rate of Penetr;:¡til)n Cement Evaluation 5 Col i: Pressure 5 Col Temperature 5 Col V 0 Asc /0 Asc Directional Survey Directional Survey Well CoreslSamples Information: Name Interval Start Stop Received Sent WAGIN J~ J"~~:r- API No. 50-103-20466-00-00 0cYþ Directi~ Yes ) Current Status WAGIN (data taken from Logs Portion of Master Well Data Maint Interval OHI . Start Stop CH Received Comments 3200 17968 Open 4/23/2004 RESISTIVITY, GR + EMF, PDF GRAPHICS 3199 17961 Open 10/3/2003 GR, EWR4, Rap 3199 17961 Open 1 0/3/2003 GR, EWR4, Rap 1026 18019 10/3/2003 2 reports, 1 is MWD 625 3233 10/3/2003 (3 reports) PB1, PBI- MWD, PB1-GYRO 3199 17961 Open 1 0/3/2003 GR, EWR4, Rap 3199 17961 Open 101612003 GR, EWR4, ROP 11100 11750 Case 1/30/2004 Cement Bond Log SCMT- BB/PSP: Press/Temp 11100 11750 Case 1/30/2004 Cement Bond Log SCMT- BB/PSP: Press/Temp . 11100 11750 Case 1/30/2004 Cement Bond Log SCMT- BB/PSP: Press/Temp 1026 18019 2/3/2005 IIFR (Sag Corrected) 0 3233 2/3/2005 PB1 IIFR (Sag Corrected) Sample Set Number Comments DATA SUBMITTAL COMPLIANCE REPORT 12/5/2005 Permit to Drill 2031510 Well Name/No. COLVILLE RIV UNIT CD2-18 Operator CONOCOPHILLlPS ALASKA INC MD 18019 Completion Date 9/23/2003 Completion Status WAGIN TVD 7215 ADDITIONAL INFORM#{ON Well Cored? y~ W Daily History Received? Chips Received? - Y / N Formation Tops Analysis Received? ~ -".,._.._._----~- -_._-~,~-,....- ~,-_.,..__._----~--------- "...-----,.-.- Comments: ~--- J,~, .~,- Compliance Reviewed By: Current Status WAGIN ®/N ð/N Date: _ API No. 50-103-20466-00-00 UIC Y --~ -b~F- . . . AOGCC Helen Warman 333 W. 7th Ave. Suite 100 Anchorage, AK 99501 . 01-Feb-05 DEFINITIVE Re: Distribution of Survey Data for Well CD2-18PB1 (Sag Corrected) Dear Dear Sir/Madam: Enclosed is one disk with the *.PTT and *.PDF files. Tie-on Survey: Window / Kickoff Survey: Projected Survey: 0.00' MD 0.00' MD 3,233.00' MD (if applicable) PLEASE ACKNOWLEDGE RECEIPT BY SENDING AN EMAIL TO CARL.ULRICH@HALLlBURTON.COM OR SIGNING AND RETURNING A COPY OF THE TRANSMITTAL LETTER TO THE ATTENTION OF: Sperry-Sun Drilling Services Attn: Carl Ulrich 6900 Arctic Blvd. Anchorage, AK 99518 Date f FJ, )Jr¡:r-. Signed iLl ()L I Please call me at 273-3545 if you have any questions or concerns. Regards, Carl Ulrich Survey Manager Attachment(s) ;(ö3 - /y- / . . 01-Feb-05 AOGCC Helen Warman 333 W. 7th Ave. Suite 100 Anchorage, AK 99501 DEFINITIVE Re: Distribution of Survey Data for Well CD2-18(Sag Corrected) Dear Dear Sir/Madam: Enclosed is one disk with the *.PTT and *.PDF files. Tie-on Survey: Window I Kickoff Survey: Projected Survey: 1,026.55' MD 1,078.00' MD 18,019.00' MD (if applicable) PLEASE ACKNOWLEDGE RECEIPT BY SENDING AN EMAIL TO CARL.ULRICH@HALLlBURTON.COM OR SIGNING AND RETURNING A COpy OF THE TRANSMITTAL LETTER TO THE ATTENTION OF: . Sperry-Sun Drilling Services Attn: Carl Ulrich 6900 Arctic Blvd. Anchorage, AK 99518 Date ) FJ;7 ~:;,-- Signed W alJJ Please call me at 273-3545 if you have any questions or concerns. Regards, Carl Ulrich Survey Manager Attachment(s) ~D~-I)-I · '~'~'····""f§".. · ß.ð¿ LA J C WELL LOG TRANSMlrfAL To: State of Alaska Alaska Oil and Gas Conservation Comm. Attn": Howard Okland 333 West 7th Avenue, Suite 100 Anchorage, Alaska 99501-3539 April 20, 2004 RE: MWD Fonnation Evaluation Logs: CD2-18, AK-MW-2649344 CD2-18: Digital Log Images: 50-103-20466-00 #·/~Cca¡ 1 CD Rom PLEASE ACKNOWLEDGE RECEIPT BY SIGNING AND RETURNING TIIE ATTACHED COPIES OF THE TRANSMITTAL LETTER TO THE ATTENTION OF: Sperry-Sun Drilling Services Attn: Rob Kalish 6900 Arctic Blvd. Anchorage, Alaska 99518 Date: 'y ~ Signed: ~{ ðfAj . . Johnson, Vern To: Subject: Thomas Maunder; Alvord, Chip RE: CRU CD1-07 ¡ -- \...4 JO'?, - dd ~ Torn, I plan to include details regarding surface sidetracks in any future annular disposal applications. I mentioned it to the rest of the drilling group in our morning meeting to raise awareness that any unplanned events drilling surface hole need to be communicated to the AOGCC in annular disposal applications.. ,\ ~O 1.-\ -(Yd ~ I went back through Alpine drilling data, dating \ba:k~g July 2002, and the only wells that were sidetracked in surface hole were CDl-46 and~2~1ª. I recently sent you the FIT for CD2-18 and it showed a good surface FIT. I have also sent over a package of additional data to support the annular disposal application for CD1-07. Let me know if there is anything else I you need. ~~~-l5 \ f¡. Vern Johnson -----Original Message----- From: Thomas Maunder [mailto:tom_maunder@adrnin.state.ak.us] Sent: Tuesday, February 24, 2004 11:29 AM To: Johnson, Vern; Alvord, Chip Subject: CRU CD1-07 :-EB 2 ry )ilnJ Vern and Chip, Recently approval for annular disposal and to initiate water injection into the subject wellbore were given. As I was filing information I noted a mud log report in the file which I examined. After reading the report, I have a couple of questions. These comments are in particular for the surface hole. It is indicated that after TDing the surface hole at 3016' md that it proved not possible to enter the old hole during the trip and a new wellbore was drilled from about 1104' to 2660' where the old wellbore was reentered. Surface hole was ultimately TDed at 3051'. It appears that the surface casing was successfully run and cemented with the intersection point some 400' md above the shoe. Although the initial leak off test showed 2 slopes, I think it unlikely that given the md between the intersection and the shoe depth that there is any communication with the lost section. I don't believe that the analysis of your AD application would have changed, however I do believe that information regarding the loss of the hole section should have been included in your application. CPAI was fortunate to have intersected the old wellbore. If the intersection had not occurred, there would have been 2 penetrations fairly close to each other at the shoe depth and the ability to use the well for annular disposal would likely have been compromised. In the future if an unplanned/unfortunate event such as this should occur, then that information should be part of any application that you might submit. This event does result in one other "big" question. surface hole sections that have been lost at Alpine. with any questions. Are there any other Please call me Tom Maunder, PE AOGCC Schlumbepgep Schlumberger Technology Corporation, by and through is Geoquest Division 3940 Arctic Blvd, Suite 300 Anchorage, AK 99503-5711 ATTN: Beth Well Log Description Job# CD2-07 ¿fX13~ ISi- 1069824 SCMT CD2.18~"'}S} 10696823 SCMT SIGN;D~:-'('l.LN~<_O ~~,;Y,""\_ Date 01/11/04 01/11/04 DATE: 7 NO.31Qt Company: Alaska Oil & Gas Cons Comm Attn: Lisa Weepie 333 West 7th Ave, Suite 100 Anchorage, AK 99501 Field: Alpine BL Color Prints CD 1 1 RECEIVED ~ AN .30 2004 Please sign and return one copy of this transmittal to Beth at the above address or fax to (907) 561ÞJøæ¡0Itte&s&ms.Commiaion Anctøage ~"--, ". ~ 01/27/04 . . · MEMORANDUM State ofltlaska Alaska Oil and Gas Conservation Commission TO: Jim Regg 't?f"/z. ) ('3<'Jjclr P.I. Supervisor' ~~(l DATE: January 25, 2004 SUBJECT: Mechanical Integrity Test Conoco Phillips C02 CRU FROM: Chuck Scheve Petroleum Inspector NON- CONFIDENTIAL Packer Depth Pretest Initial 15 Min. 30 Min. weill CD2-06 I Type Inj. S I TV,D'I 6922 I TUb~ng I 511 I 511 I 511 I 511 Interval I P.T.D. 203-159 Type test P Test psi 1731 Casing 200 2050 2050 2050 P/F f Notes: weill CD2-18 I Type Inj'l S I TV.D·I 7055 I Tub~ng I 1053 I 1053 I 1053 I 1053 Ilnterval I P.T.D. 20\3-151 Typec.test P Test psi 1764 Casing 350 1850 1800 1800 P/F f Notes: weill CD2-27 I Type Inll 5 I TV.D·I 6946 I Tub~ng I 1252 I 1252 I 1252 1252 Interval I P.TD. 203-177 Type test P Test psi 1737 Casing 150 2250 2250 2250 P/F f Notes: weill CD2-40 I Type Inj'l S I T.V.D·I 7091 I Tub~ng I 1530 I 1530 I 1530 I 1530 I Interval I I P.T.D. 203-126 Type test P Test psi 1773 Casing 1000 1900 1800 1800 P/F f Notes: weill CO2-55 I Type Inj. 5 I Tv.D·1 7170 I Tub~ng I 1190 I 1190 I 1190 I 1190 Interval I P.T.D. 203-118 Type test P Test psi 1793 Casing 500 2150 2125 2125 P/F f Notes: Type INJ. Fluid Codes Type Test Interval F = FRESH WATER INJ. M= Annulus Monitoring 1= Initial Test G = GAS INJ. P= Standard Pressure Test 4= Four Year Cycle S = SALTWATER INJ. R= Internal Radioactive Tracer Survey V= Required by Variance N = NOT INJECTING A= Temperature Anomaly Survey W= Test during Workover D= Differential Temperature Test 0= other (describe in notes) Test's Details I traveled to Conoco Phillips CD2 Pad in the Alpine field and witnessed the initial MIT's on the above listed 5 wells. The pretest pressures were observed and found to be stable. The standard annulus pressure tests were then performed with all wells demonstrating good mechanical integrity. M.I.T.'s performed: §. Attachments: Number of Failures: Q Total Time during tests: 6 hours cc: MIT report form 5/12/00 L.G. MIT CRU C02 1-25-04 CS-1.xls 1/30/2004 . e dO--S- \ 5""\ MECHANICAL INTEGRITY REPORT' ....... ::~UD DA!:::: ~/5"O";" ?IG REL:S;'.S~:· cy';)~-O"'. OPER & FIELD <:. \>. þ.. ~ þ.. '-V\~tè w"ELL NUME ER c... \) d - \ <6 ....... .' C a. s iTI g : I. . - TD: \<:&()\~.l1D.. ~d\~ TVD; :?BTD: ')Ù1"\~ HI) \C.t'\~ TVD Shoe: \r>\\} HD TVD¡ DV: \--JÞr-MD ~~ ·!\tu :0'{ ~LL DATA ~:":1e:r : \.) Þ- Shoe: MD :woi:;g: 4\b Packer \\~)~ till ~ole Size ~ \16 ana Co \/¥: TVD¡ :OP: HD :".[D TVD¡ Set a.t \\ ~d...~ Perfs o ~(i f"-,.. to ~C \rt. \ó\\). - \ ~(:) \ ~ ~CF.Þ_NIC;'.L INTEGRITY - PART /1 Annulus Press Test: :P j 15 m~n 30 min COüElents: ,,- tŒCHÞ_1\!ICAL INTEGRITY - PART /2 ~s;;;t b~ \ Cement Volumes:' Þ-..mt. Liner \--J"'" ; Csg dS;)~'1-; DV ~~ . C;:¡¡t -..Tol to cover perfs \O~!>'). ~~"~'\.("'~ ~ \.<:..~~ '" ~,\>\,t'(( \) V\'>""J SÖe:;/ ,,~'\~ ~OLc'l..~ Theore tical Toe \.:'}~"\.......~ sC) <o~~ I- \C)~S, Cement Bond Log (Yes or No) '{Eo,? In AOGCe File ~~'> CBL ~valuation, zone aoove perfs ~c..t-\\ '!:!.~Ð~'> ~"'c:..~\\çc-...1.. '1>ot'-'t \,,~ s;.,.,,,",,- '1)«;<1, ~"'\ ~ y\ \-.. \ C~';)Q"'ò <. \ r'\ '\t») -k ~ ~ \0 \,,~ .\¿, \ Proàu~tion Log: Type ¡Evaluation CONCLUSIONS: ?art ;1: ?ar~ fZ: t\r: \?\~~C.~~~ ._~µ1jfVJ 'v/'6"O;' Re: FW: CD2-18 SCMT . e Subject: Re: FW: C02-18 SCMT From: Thomas Maunder <tom_maunder@admin.state.ak.us> Date: Thu, 15 Jan 2004 08:25: 10 -0900 To: "Crabtree, C L" <C.L.Crabtree@conocophillips.com> CC: "Alonzo, Chris" <Chris.Alonzo@conocophiJIips.com>, NSK Problem Well Sup v <nI617@conocophillips.com> Cliff, et al: Thanks for sending the cement log. I agree with the assessment that the bond log does look good. When originally approved to be placed in service, this well was limited to water only until the bond log could be submitted. The water only restriction is lifted. Please call with any questions. __ TomMaunder,PE ;¿O~-l::' \ AOGCC Crabtree, C L wrote: Hi Tom We recently moved Doyon 19 so we were able run an SCMT log on this injector over the weekend. You may recall this is the well that we asked for approval to begin injection based on the results of the cement job and the on-rig MIT.... The top of the Alpine C sand is at 11,961' MD (7,198' SS) at 82 degrees. The tubing tail is at 11,330' MD (7,038' SS) at 69 degrees. A summary of the cement job follows: Description of 7" Casing Cement Job Pumped on 09/15/03: RD fill up tool - blow down top drive - MU cement head & lines Circulate & condition mud & hole for cement job - stage pumps up slowly to 5 bbls/min @ 700 psi final - PJSM Cement 7" casing as follows: Pumped 5 bbls CWI00 - Test lines to 3500 psi - Pumped 15 bbls Cwl00 @ 7.32 ppg 5 bbls/min @ 680 psi - Pumped 50.5 bbls Mud Push XL 12.75 ppg @ 6 bbls/min @ 600 psi - Dropped bottom plug - Mix & pumped 54 bbls Class G w/ 0.2% D46, 0.25% D65, 0.40% D167, .02% XE902 @ 15.8 ppg 5.5 bbls/min @ 470 psi - Dropped top plug w/ 20 bbls water f/ Dowell - Switched to rig pumps & displaced w/ 438 bbls 9.6 ppg LSND mud @ 7 to 3.5 bbls/min @ 340 to 790 psi - bumped plug w/ 1240 psi - CIP @ 1041 hrs. Check floats OK Full returns while pumping job - unable to move pipe during job - lost approx. 36 bbls during job RU & test 7" casing to 3500 psi for 30 mins. - pressure bleed down to 3270 psi 10f2 1/15/20048:25 AM Re: FW: CD2-18 SCMT . e RD cement head & lines - LD landing jt. - casing elevators & long bails Pull thin wall wear bushing - set & test 7" x 9 5/8" packoff to 5000 psi The bond looks good. I've also attached a 1320 plot....... «CD2-18 1320 plot.pdf» Regards Cliff -----Original Message----- From: Dethlefs, Jerry C Sent: Sunday, January 11, 2004 7:27 AM To: Crabtree, C L Subject: CD2-18 SCMT «Scmt_VDL_Image_014.zip» Cliff: Attached is the main pass of the SCMT file for CD2-18. There will be more when Gerard gets the log completed. SWS is moving over to CD2-07 for the SCMT on that well. Jerry Dethlefs 20f2 1/15/20048:25 AM 2¿L: 11 WELL DETAiLS Name -rN/-S ~E/"W NQrthiüg Bas.ting L!lúiude LongílUdc SIQt CD2-18 -29A5 3M 5974612.15 371699.38 70~2¡)'¡9.935N IS1c02'27.9:76W NIA '¡:;' ~ o o o 8000- 7000- I CD2-23 (CD2-23) 6000- I CD2-i5 (CD2-i5) 1\ ." 1 CD2-i5 (CD2-15PB2) , 5000- '-' ~ .±, 13 õ ~ ~ i3 ;:: o rn S:J A,,,r::s 0- -toOO- I Alpine West (2) I I I I I -12000 I -7000 I -13000 I -11 000 I -10000 I -9000 I -8000 West(-)/East(+) [1 OOOftlin] . ConocóP'hillips . G. C. Alvord Alpine Drilling Team Leader Drilling & Wells P. O. Box 100360 Anchorage, AK 99510-0360 Phone: 907-265-6120 December 9,2003 Commissioner State of Alaska Alaska Oil & Gas Conservation Commission 333 West ¡th Avenue Suite 100 Anchorage, Alaska 99501 Subject: Well Completion Report for CD2-18 / CD2-18PB1 (APD 203-151) Dear Commissioner: ConocoPhillips Alaska, Inc. submits the attached Well Completion Report for the recent drilling operations on the Alpine well CD2-18 / CD2-18PB 1 . If you have any questions regarding this matter, please contact me at 265-6120. Sincerely, ß-C. ~ G. C. Alvord Alpine Drilling Team Leader CPAI Drilling and Wells GCA/skad RECEIVED DEC - 92003 Alaska Oil & Gas Cons. Commission Anchorage ORIGINAL I STATE OF ALASKA - ALAS OIL AND GAS CONSERVATION COM~ON WELL COMPLETION OR RECOMPLETION REPORT AND LOG 1a" Well Status: Oil D Gas U Plugged D Abandoned U 20AAC 25.105 No. of Completions _ GINJ D 2. Operator Name: WINJ D WDSPL D ConocoPhillips Alaska, Inc. 3. Address: P. O. Box 100360, Anchorage, AK 99510-0360 4a. Location of Well (Governmental Section): Surface: 1746' FNL, 1542' FEL, Sec. 2, T11N, R4E, UM At Top Productive Horizon: 758' FNL, 229' FWL, Sec" 3, T11 N, R4E, UM Total Depth: 687'FNL,2590'FEL,Sec.33,T12N,R4E,UM 4b. Location of Well (State Base Plane Coordinates): Surface: x- 371699 . y- TPI: x- 362928 y- Total Depth: x- 360197 y- 18. Directional Survey: Yes 0 NoU 5974612 5975755 5981157 Zone- 4 Zone- 4 Zone- 4 2L Logs Run: GRlRes 22. Suspended D WAG 0 20AAC 25.110 Other 5. Date Comp., Susp., or Aband.: September 23, 2003 6. Date Spudded: September 5,2003 7. Date TD Reached: September 21, 2003 8. KB Elevation (It): 38.8' RKB 1 52.7' AMSL 9. Plug Back Depth (MD + TVD): 18019' MD 17215' TVD 10. Total Depth (MD + TVD): . 18019' MD 17215' TVD . 11. Depth where SSSV set: Landing Nipple @ 2636' 19. Water Depth, if Offshore: N/A feet MSL CASING SIZE GRADE H-40 J-55 L-80 CASING, LINER AND CEMENTING RECORD SETTING DEPTH MD TOP BOTTOM Surface 109' Surface 3221' Surface 12112' WT. PER FT. 62.5# 36# 26# 16· 9.625" 7· 23. Perforations open to Production (MD + TVD of Top and Bottom Interval, Size and Number; if none, state ·none·): open hole completion from 12112' to 18019' MD 26. Date First Injection October 30, 2003 Date of Test Hours Tested HOLE SIZE 1b. Well Class: Development D Exploratory D Service 0 Stratigraphic Test D 12. Permit to Drill Number. 203-1511 13. API Number: 50-103-20466-00 1 50-103-20466-70 14. Well Name and Number: CD2-181 CD2-18PB1 15. Field/Pool(s): Colville River Field Alpine Oil Pool 16. Property Designation: ADL 380075, 387207 17. Land Use Permit: ALK ASRCNPRA02 20. Thickness of Permafrost: 1892' MD 42· 305 sx AS 1 CEMENTING RECORD AMOUNT PULLED 531 sx AS III Lite, 234 sx Class G 252 sx Class G 12.25" 8.5" 24. SIZE 4.5· TUBING RECORD DEPTH SET (MD) 11329' PACKER SET (MD) 11235' 25. ACID, FRACTURE, CEMENT SQUEEZE, ETC. DEPTH INTERVAL (MD) AMOUNT AND KIND OF MATERIAL USED N/A PRODUCTION TEST Method of Operation (Flowing, gas lilt, etc.) Injector Production for OIL-BBL GAS-MCF Test Period --> Calculated OIL-BBL Flow Tubing Casing Pressure press. 27. psi 24-Hour Rate -> WATER-BBL GAS-MCF WATER-BBL CHOKE SIZE IGAS-OIL RATIO OIL GRAVITY - API (corr) not available Brief description of lithology, porosity, fractures, apparent dips and presence of oil, gas or water (attach separate sheet, if necessary). Submit core chips; if none, state "none'. r :~;,¡:X~-;.~ãi~-¡ j ~ij-=-~c3i ¡ 2A/[Ei"'Er) ¡ !- . - --¡ !,... .~"."..,~.,,",.i NONE Form 1 0-407 Revised 2/2003 CORE DATA CONTINUED ON REVERSE SIDE U;-(, G H\!AL RECEIVED DEC - 9 2003 Alaska Oil & Gas Cons. Commission Anchorage Submit in duplicate III)MS BFl. DEC 1 0 2(}ij3 28. GEOLOGIC MARKERS. 29. . FORMATION TESTS NAME MD TVD Include and briefly summarize test results. List intervals tested, and attach detailed supporting data as necessary. If no tests were conducted, state "None". CD2-18 Seabee Form. Nanushak Gamma Ray Shale Kalubik Kuparuk Formation Miluveach Top Alpine D Top Alpine C Alpine A Base Alpine C Top Alpine C TD 3268' 5865' 10825' 11293' 11411' 11560' 11859' 11956' 14714' 14714' 17960' 18019' 2413' 3840' 6870' 7077' 7119' 7166' 7235' 7250' 7268' 7268' 7222' 7215' N/A RECEIVED DEC - 92003 Alaska Oil & Gas Cons. Commission Anchorage 30. LIST OF ATTACHMENTS Summary of Daily Operations, Directional Survey 31. I hereby certify that the foregoing is true and correct to the best of my knowledge. Contact: Vem Johnson @ 265-6081 Printed Name C'ê/J!::d Signature Þ ~ Title: Phone Alpine Drillina Team Leader 'U,<Ç- ~ (l.o Date {'L(8(Pj Prepared by Vem Johnson INSTRUCTIONS General: This form is designed for submitting a complete and correct well completion report and log on all types of lands and leases in Alaska. Item 1a: Classification of Service wells: Gas injection, water injection, Water-Alternating-Gas Injection, salt water disposal, water supply for injection, observation, or Other. Multiple completion is defined as a well producing from more than one pool with production from each pool completely segregated. Each segregated pool is a completion. Item 4b: TPI (Top of Producing Interval). Item 8: the Kelly Bushing elevation in feet abour mean low low water. Use same as reference for depth measurements given in other spaces on this form and in any attachments. Item 13: The API number reported to AOGCC must be 14 digits (ex: 50-029-20123-00-00). Item 20: True vertical thickness" Item 22: Attached supplemental records for this well should show the details of any multiple stage cementing and the location of the cementing tool. Item 23: If this well is completed for separate production from more than one interval (multiple completion), so state in item 1, and in item 23 show the producing intervals for only the interval reported in item 26. (Submit a separate form for each additional interval to be separately produced, showing the data pertinent to such interval). Item 26: Method of Operation: Flowing, Gas Lift, Rod Pump, Hydraulic Pump, Submersible, Water Injection, Gas Injection, Shut-in, Other (explain). Item 27: If no cores taken, indicate "none"" Item 29: List all test information. If none, state "None". Form 10-407 Revised 2/2003 OR\G\NAL - ... Page 1 of 8 ConocoPhillips Alaska Operations Summary Report Legal Well Name: CD2-18 Common Well Name: CD2-18 Event Name: ROT - DRILLING Contractor Name: doyon1 @ppco.com Rig Name: Doyon 19 Date ¡From - To Hours Cd: Sub Phase o e ~ Code 9/4/2003 14:30 - 16:00 1.50 MOVE MOVE MOVE 16:00 - 18:00 2.00 RIGMNT RGRP MOVE 18:00 - 19:00 1.00 MOVE POSN MOVE 19:00 - 20:30 1.50 MOVE RGRP MOVE 20:30 - 22:00 1.50 MOVE POSN MOVE 22:00 - 23:00 1.00 WELCTL NUND SURFAC 23:00 - 00:00 1.00 DRILL PULD SURFAC 9/5/2003 00:00 - 00:45 0.75 DRILL SFTY SURFAC 00:45 - 01 :15 0.50 DRILL REAM SURFAC 01:15-03:00 1.75 DRILL PULD SURFAC 03:00 - 12:00 9.00 DRILL DRLG SURFAC 12:00 - 00:00 12.00 DRILL DRLG SURFAC 9/6/2003 00:00-01:15 1.25 DRILL DRLG SURFAC 01:15 - 02:15 1.00 DRILL CIRC SURFAC 02:15 - 05:30 3.25 DRILL DRLG SURFAC 05:30 - 06:30 1.00 DRILL CIRC SURFAC 06:30 - 09:00 2.50 DRILL DRLG SURFAC 09:00 - 10:30 1.50 DRILL CIRC SURFAC 10:30 - 12:00 1.50 DRILL WIPR SURFAC 12:00 - 12:30 0.50 DRILL WIPR SURFAC 12:30 - 14:30 2.00 DRILL WIPR SURFAC 14:30 - 15:00 0"50 DRILL CIRC SURFAC 15:00 - 16:00 1.00 DRILL WIPR SURFAC 16:00 - 00:00 8.00 DRILL DRLG SURFAC 9/7/2003 00:00 - 12:00 12.00 DRILL DRLG SURFAC 12:00 - 12:15 0.25 DRILL DRLG SURFAC 12:15 - 14:00 1.75 DRILL CIRC SURFAC 14:00 - 16:00 2.00 DRILL WIPR SURFAC 16:00 - 16:30 0.50 DRILL CIRC SURFAC Start: 9/8/2003 Rig Release: 9/23/2003 Rig Number: Spud Date: 9/8/2003 End: Group: Description of Operations Move pits and motor complex away fro rig. Slide rig floor back and move off of well CD2-30. Remove off-driller's side rear foot jacking ram from sub-base for repair Move rig and spot over CD2-18 and level rig Install off-driller's side rear foot jacking ram and fabricate shimming bracket. Move in pits and motor complex, RIU lines and cables N/U surface riser and flowline. Accept the rig at 22:00 hours. RIH wI stand of d.p and tag @ 46', MIU bit, motor, x-o, and stand of HWDP Pre-spud meeting. Fill hole and check for leaks. Test lines to 3000 psi Clean out conductor from 45' to 114' @ 130 spm, 420 psi, 40 rpm P/U BHA. Orient and upload MWD. M/U DC's. Shallow test MWD Drill from 114' to 925'. Take gyro surveys to 625'. AST =4.4, ART =.6, TVD=906', PU=120, SO=117 Drill from 925' to 2660'. ART =4.7, AST =2.5, ADT =7.2, TVD=2049'. Pu=130, SO=118, ROT=125, Torque=8000 on17200 off. Rotary=70, WOB=10/30, Pump = 2140 psi @ 185 spm (650 gpm) Drill from 2660' to 2876' and lost returns Stand back 1 stand and reestablish circulation @ 288 gpm @ 640 psi. Regained full returns. Increased rate to 600 gpm and mixed 40 bbl LCM pill @ 25 ppb for contingency" Lost 60 bbl mud Drill from 2876' to 3067'. Hole packing off while backreaming before a connection. Reduced pump rate and worked through tight spot @ 3013'. Establish full returns and pump LCM pill. Drill from 3067' to 3233'. TVD= 2398' ADT = 481, AST =.79, ART =4.02, PU=125k, SO=110k, Rot=122k, Torque=7000 on!6000 off. Rotary=65, WOB=10-25, Pump=1800 psi @ 171 spm, 600 gpm Pump hi-vis sweep wI LCM for short trip and CBU 2x Observe well-static. POOH on trip tank from 3233' to 2963' and work thru tite wI pump to 287. Continue to POOH on trip tank to 2781' POOH on triip tank from 2781' to 2397'. Hole swabbing. CBU wI 500 gpm @ 1500 psi POOH on trip tank to 1088'. Tite (10-40k over) @ 1088'. Unable to circulate. Work stand down to 1160' and establish circulation. CBU until clean. Fair amount of clay over shakers. POOH on trip tank to 700' wI no problems. RIH to 1115' and hit bridge. Unable to get past. Bridge hard and drilling very rough. Orient to high side and slide off bridge. Take check shot survey. Hole sidetracked" Redrill from 1115' to 2100'. ART =2.2, AST =1.8, ADt=4.0 TVD=1701'. Drill from 2100' to 3161'. TVD= 2352', ADT=7.76, ART=6.08, AST=1.68. Full returns. PU=145, SO=120, Rot=130, Torque=40000n! 8000 off" Rotary=70, WOB= 30-40k, Pump = 2170 psi @ 171 spm, 600 gpm. Getting large amount of cuttings over shakers on bottoms up after connections Drill from 3161' to 3233'. TVD= 2352', ADT=.25, ART=.25, AST=O. Full returns. PU=145, SO=120, Rot=130, Torque=4000 on/8000 off" Rotary=70, WOB= 30-40k, Pump = 2170 psi @ 171 spm, 600 gpm Circ sweep and weight up to 9.8 ppg @ 600 gpm, 1910 psi POOH from 3233' to 2780' PUlling 10-40k over. Pump out from 2780' to 2210' @ 243 gpm, 600 psi CBU @ 1440 psi @ 495 gpm Printed: 10/10/2003 4:31:18 PM · Page 2 of 8 ConocoPhillips Alaska Operations Summary Report Legal Well Name: CD2-18 Common Well Name: CD2-18 Event Name: ROT - DRILLING Contractor Name: doyon1 @ppco.com Rig Name: Doyon 19 Date ¡From - To ¡ Hours ¡ Code : ¿'oUdbe Phase ..u.. ......_.,. _"... 9nt2003 16:30 - 17:00 0.50 DRILL WIPR SURFAC 17:00 - 18:30 1.50 DRILL CIRC SURFAC 18:30 - 21 :30 3.00 DRILL TRIP SURFAC 21 :30 - 00:00 2.50 DRILL TRIP SURFAC 9/8/2003 00:00 - 00:15 0.25 DRILL TRIP SURFAC 00: 15 - 02:45 2.50 DRILL TRIP SURFAC 02:45 - 04:15 1.50 CASE RURD SURFAC 04: 15 - 09:00 4.75 CASE RUNC SURFAC 09:00 - 09:30 0.50 CASE CIRC SURFAC 09:30 - 12:00 2.50 CASE RUNC SURFAC 12:00 - 12:30 0.50 CASE RUNC SURFAC 12:30 - 15:00 2.50 CASE CIRC SURFAC 15:00 - 16:30 1.50 CEMENT PUMP SURFAC 16:30 - 17:30 1.00 CEMENTDISP SURFAC 17:30 - 18:30 1.00 CASE DEQT SURFAC 18:30 - 19:30 1.00 CASE RURD SURFAC 19:30 - 21 :00 1.50 WELCTL NUND SURFAC 21 :00 - 00:00 3.00 RIGMNT RGRP SURFAC 9/9/2003 00:00 - 07:00 7.00 WELCTL NUND SURFAC 07:00 - 12:00 5.00 WELCTL BOPE SURFAC 12:00 - 12:30 0.50 DRILL OTHR SURFAC 12:30 - 16:00 3"50 DRILL PULD SURFAC 16:00 - 16:30 0.50 DRILL TRIP SURFAC 16:30 - 18:30 2.00 DRILL TRIP SURFAC 18:30 - 21 :00 2.50 DRILL TRIP SURFAC 21 :00 - 23:30 2.50 DRILL TRIP SURFAC 23:30 - 00:00 0.50 DRILL DRLG SURFAC Start: 9/8/2003 Rig Release: 9/23/2003 Rig Number: Spud Date: 9/8/2003 End: Group: Description of Operations _....__n_.. . .. . . RIH from 2210' to 3233' Circulate weighted sweep around. POOH on trip tank from 3162' to 1051' wI good hole filL Ran in and out of hole at 1240' to 1115' 3 x to be sure side track was open. Hole tight @ 1051' Attempt to circulate-hole packed off. RIH to 1359' and establish circulation. Pump out of hole to 800'. RIH to 1359' and POOH on trip tank to 635' Stand back hwdp and jars to 168' Stand back d.c.'s and UD stabilizer, UBHO, Download MWD, Break bit and adjust motor back to O. UD MWD tools and clear floor RlU casers and hold pre-job safety meeting RIH wI 9-5/8' 36#, J-55, BTC csing to 749' wI insufficient returns" CBU RIH to 877' wI no returns and taking wt. POOH to 833' and circulate down to 876'. Run casing to 920' wI no returns" Break circulation and wash casing to 1051 wI good returns. RIH to 1656' CBU @ 4 bpm-280 psi Continue running 9-5/8' casing to 2845' wI good returns Continue running 9-5/8' casing to 3182' MIU landing jt and landi casing @ 3221'. UD fillup tool and blowdown topdrive. RlU cement head Circ and condition mud while reciprocating casing" PU=17Ok, S/O=125k. 5 bpm @ 230 psi. Hold safety meeting Pump 40 bll viscosified water wI nutplug wI rig pump. Pump 5 bbl water wI dowell and test lines to 2500 psi. Drop bottom plug. Dowell pumped 40 bbl mud push @ 10.5 ppg 405 bbllead @ 10.7 ppg, and 48 bbl tail @ 15.8 ppg. Dropped top plug Dowell pumped 20 bbl water. Pumped 222 bbl mud wI rig pump and bumped plug w/1 050 psi @ 17:08 hrs. Good returns throughout job. Circulated 225 bbl slurry to surface. Check floats-OK. RlU and pressure test casing to 2500 psi for 30 min.-OK RID casers. UD landing jt. Flush out surface riser N/D surface riser. N/U unihead. CIO bales and top drive saver sub Change out mud cross on BOP's. N/U BOPE Change out mud cross - NU BOPE - bell nipple - flow line - service lines - Install mouse hole & turn buckles Set test plug - Test BOPE - Hydril to 250 & 3500 psi - pipe rams, blind rams, choke & kill line valves, choke manifold valves, TD manual & auto IBOP valves, floor TIW & dart valves to 250 & 5000 psi - perform accumulator closure test - Pull test plug - set wear bushing (John Crisp AOGCC waived witnessing of test) Finish repair of acuator on TD - PU Geo pilot skid - PU lift subs & XO MU BHA - PU Geo Pilot & MU bit - PU MWD - Change out & reload MWD componet (DMHOC) - upload MWD - Shallow test MWD & Geo Pilot RIH wI BHA to 632' - Change out drilling jars Continue RIH wI BHA - picking up 4' drill pipe fl pipe shed to 2254' (51 jts) POOH & rack back 17 stds RIH wI BHA - continuing to PU 4" drill pipe fl pipe shed (75 jts.) to 3031' Wash & ream f/3031' to 3123' - tag top of cmt - Drill cement - wiper plugs - FC @ 3139' - cmt & FS @ 3220' - clean out rat hole to 3233' Drill 20' new hole fl 3233' to 3253' Md 2404' TVD RPM 80 WOB 2/12 k 550 GPM @ 2300 psi String wt. PU 145 SO 100 Rot. 120 Printed: 10/10/2003 4:31:18 PM '- .. Page 301 8 ConocoPhillips Alaska Operations SU{I1mary Report' ECD's average 10.6 ppg 12.00 DRILL DRLG INTRM1 Drill 8 1/2" hole wI GeoPilot fl 9175' to 10,187' MD 6502' TVD WOB 15/25 k RPM 170 GPM 651 @ 3540 psi String wt. PU 265 SO 135 Rot 175 Torque onloff btm. - 16,0001 15,000 ft/lbs. ADT - 8.89 hrs. Aver. ECD - 10.6 Dri1l81/2" hole w/GeoPilot f/ 10,187' to 10,378' MD 6609' TVD Same parameters as above ADT -1.70 hrs. Aver. ECD 10.6 Pump weighted sweep & circulate hole clean for wiper trip - 3X btms up - standing back 1 std DP every 30 mins.- fl 10,378' to 10,092'- Observed sweep @ shakers wI no increase in cuttings - Pump out f/10,092' to 9428' (7 stds) pumping 650 gpm wI 170 RPM's Monitor well - static - POOH on trip tank fl 9428' to 3218' - Tight spots @ 7900',7150', 6940' & 6510 - 20 to 30 k over Slip & cut drill line 60' - service TD & adjust brakes - monitor well on TT RIH fl 3218' to 5131' - fill pipe every 2000' RIH fl 5131' to 10,282' - filling pipe every 2,000' - hole slick going in hole 5-6 k drag Break circulation - Circulate btms. up - Wash & ream f/10,282' to 10,378' - Stage pumps up fl 400 gpm to 600 gpm @ 3380 psi 150 RPM's ECD 11.1 to 10.38 after btms up 8.75 DRILL DRLG INTRM1 Drill 8 1/2" hole wI GeoPilot f/10,378' to 11,270' MD 7069'TVD WOB 15/25 k RPM's 170 GPM 550 @ 2990 psi Legal Well Name: CD2-18 Common Well Name: CD2-18 Event Name: ROT - DRILLING Contractor Name: doyon1 @ppco.com Rig Name: Doyon 19 Date From - To H()urs ... Code Sub Phase Code 9/10/2003 00:00 - 00:15 0.25 DRILL CIRC SURFAC 00:15 - 01 :00 0.75 DRILL FIT SURFAC 01 :00 - 12:00 11.00 DRILL DRLG INTRM1 12:00 - 00:00 12.00 DRILL DRLG INTRM1 9/11/2003 00:00 - 07:45 07:45 - 09:00 09:00 - 12:00 7.75 DRILL DRLG INTRM1 1.25 RIGMNT RGRP INTRM1 3.00 DRILL DRLG INTRM1 12:00 - 00:00 12.00 DRILL DRLG INTRM1 9/12/2003 00:00 - 12:00 12:00 - 14:00 2.00 DRILL DRLG INTRM1 14:00 -16:30 2.50 DRILL CIRC INTRM1 16:30 - 17:30 1.00 DRILL TRIP INTRM1 17:30 - 21:30 4.00 DRILL TRIP INTRM1 21 :30 - 23:00 1.50 RIGMNT RSRV INTRM1 23:00 - 00:00 1.00 DRILL TRIP INTRM1 9/13/2003 00:00 - 02:30 2.50 DRILL TRIP INTRM1 02:30 - 03:15 0"75 DRILL REAM INTRM1 03:15 - 12:00 Start: 9/8/2003 Rig Release: 9/23/2003 Rig Number: Spud Date: 9/8/2003 End: Group: Description 01 Operations Change well over f/9.8 ppg spud mud to 9.6 ppg LSND mud RU - perform FIT to 16.1 ppg EMW wI 9.6 ppg mud wI 800 psi surface pressure @ 2385' TVD - blow down lines - RD Drill 8 1/2" hole wI GeoPilot fl 3253' to 4669' MD 3256' TVD WOB 10/15 k RPM 130 GPM 600 @ 2580 psi String wt. PU 158 SO 105 Rot 125 Torque onloff btm - 10,000/9,000 ft/lbs. ECD's averaging 10.9 ppg ADT - 5.59 hrs. Drill 8 1/2" hole wI GeoPilot f/4696' to 6272' MD 4097' TVD WOB 8/18 k RPM 130/170 GPM 650 @ 3640 psi String wt. PU 165 SO 118 Rot 137 Torque onloff btm - 11,000/9,000 ft/lbs. ECD's averaging - 10.7 ppg ADT - 8.21 hrs. Drill 8 1/2" hole wI Goo Pilot fl 6272' to 7514' MD Circulate wI MP #1 - Replace 4 seats & 4 valves in MP #2 Drill 8 1/2" hole wI GoePilot f/7514' to 7838' MD 5085' TVD WOB 10/18 k RPM 170 GPM 649 @ 3520 psi String wt. PU 215 SO 125 Rot 155 Torque onloff btm - 13,000/12,000 ft./lbs. ADT- 6.72 hrs. (since midnight) Drill 8 1/2" hole wI GeoPilot f/7838' to 9175' MD 5906' TVD WOB 10/22 k RPM 170 GPM 650 @ 3640 psi String wt. PU 232 SO 130 Rot 170 Torque on/off btm - 14,000 to 18,0001 13,000 ftIIbs" ADT -7"78 hrs" Printed: 10/10/2003 4:31:18 PM - ... ConocoPhillips Alaska Operations Summary Report', Page 4 of 8 Legal Well Name: CD2-18 Common Well Name: CD2-18 Event Name: ROT - DRILLING Contractor Name: doyon1 @ppco.com Rig Name: Doyon 19 Date Froní -To Hours Code Sub Phase Code -"---- 9/13/2003 03:15 - 12:00 8.75 DRILL DRLG INTRM1 Start: 9/8/2003 Rig Release: 9/23/2003 Rig Number: Spud Date: 9/8/2003 End: Group: Description of Operations String wt. PU 265 SO 135 Rot 185 Torque on/off btm - 16,000/15,000 ft./lbs" ADT - 5.36 hrs. ECD's - 10.6 12:00 - 23:00 11.00 DRILL DRLG INTRM1 Drill 8 1/2" hole w/ Geo Pilot f/11,270' to 12,124' MD 7272' TVD WOB 15/25 k RPM's 165 GPM 550 @ 2840 psi String wt. PU 260 SO 135 Rot 185 Torque on/off btm - 18,000/16,000 ft./lbs. ADT - 8.2 hrs. ECD's - 10.5 Top of Alpine C - 11,958' MD 7249' TVD 23:00 - 23:30 0.50 DRILL CIRC INTRM1 Pump out to above Alpine f/12,124' to 11,904' w/ 550 gpm @ 2840 psi w/120 RPM's 23:30 - 00:00 0.50 DRILL CIRC INTRM1 Pump Hi-vis sweep - Circulate hole clean 9/14/2003 00:00 - 02:30 2.50 DRILL CIRC INTRM1 Circulate Hi-vis sweep - circ hole clean w/ 3X btms. up - standing back 1 std every 30 mins. f/11.904' to 11,523' w/550 gpm @ 2820 psi w/ 120 rpm's 02:30 - 06:15 3.75 DRILL TRIP INTRM1 POOH on trip tank to 11 ,495' - pulling tight - MU top drive - pump out to 11,045' - switch over & POOH on trip tank to 7227' - work through tight spots @ 11,096' & 11,072' - average drag 5 to 10 over 06: 15 - 06:30 0.25 DRILL OTHR INTRM1 Pump dry job - blow down top drive 06:30 - 08:00 1.50 DRILL TRIP INTRM1 Continue POOH on TT f/ 7227' to 2931' - 5 to 10 drag - proper hole fill 08:00 - 08:15 0.25 DRILL OTHR INTRM1 Remove GeoPilot skid f/ rig floor - monitor well on TT 08:15 - 09:45 1.50 DRILL TRIP INTRM1 Continue to POOH - LD ghost reamers - change handling equipment to 5" - std back HWDP & jars 09:45 - 12:00 2.25 DRILL PULD INTRM1 Handle BHA - LD stab - std back NM flex DC's - Down load MWD & service GeoPilot - LD bit - GeoPilot - remove pulser & LD MWD - clean up rig floor 12:00 - 12:30 0.50 DRILL OTHR INTRM1 PU stack washer & flush BOP stack 12:30 - 14:30 2.00 CASE OTHR INTRM1 Pull wear bushing - set test plug - Change top pipe rams to 7' & test to 250 & 5000 psi - pull test plug & set thin wall wear bushing 14:30 - 15:30 1.00 CASE RURD INTRM1 RU to run 7" casing - Held PJSM 15:30 - 18:30 3.00 CASE RUNC INTRM1 Run 7" 26# L-80 MBTC casing as follows: FS (Ray Oil Tool Silver bullet) 2 jts. - FC (Weatherford) - 2 jts. (first 4 connectioins BakerLoc - fill pipe & check floats on jt # 4) 71 jts" to 3207.71' (75 jts. total) 18:30 - 19:00 0.50 CASE CIRC INTRM1 Break circulation & circulate casing capacity - 4 bbls / min @ 240 psi - PU wt135 SO wi 115 19:00 - 23:00 4.00 CASE RUNC INTRM1 Continue running 7" 26# L-80 MBTC casing - f/3207' to 8123.56' - 190 jts. total 23:00 - 00:00 1.00 CASE CIRC INTRM1 Break circulation & circulate btms up - Start 4 bbls/min @ 630 psi 9/15/2003 00:00 - 00:30 0.50 CASE CIRC INTRM1 Continue circulating btms up @ 8123' @ 4 bbls/min @ 410 psi final PU 250 SO 145 00:30 - 03:00 2.50 CASE RUNC INTRM1 Continue to run 7" casing f/8123' to 10,697' (250 jts total) full returns while running pipe 03:00 - 04:30 1.50 CASE CIRC INTRM1 Break circulation & circulate btms up + @ 10,697' 4 bbls/min @ 580 psi PU 325 SO 150 04:30 - 06:15 1.75 CASE RUNC INTRM1 Finish running 7" casing f/1 0,697' to 12,075' (282 jts. total ran) PU hanger & landing jt. - Land casing in wellhead on FMC fluted hanger w/ shoe @ 12,112' & FC @ 12,094' SO wt 145 06:15 - 06:45 0.50 CASE OTHR INTRM1 RD fill up tool - blow down top drive - MU cement head & lines 06:45 - 08:45 2.00 CEMENTCIRC INTRM1 Circulate & condition mud & hole for cement job - stage pumps up Printed: 10/10/2003 4:31:18 PM . . Page 5 of 8 ConocoPhillips Alaska Operations Summary Report 2.00 CEMENTCIRC INTRM1 slowly to 5 bbls/min @ 700 psi final - PJSM 2.00 CEMENT PUMP INTRM1 Cement 7" casing as follows: Pumped 5 bbls CW1 00 - Test lines to 3500 psi - Pumped 15 bbls Cw100 @ 7.32 ppg 5 bbls/min @ 680 psi- Pumped 50.5 bbls Mud Push XL 12.75 ppg @ 6 bbls/min @ 600 psi- Dropped bottom plug - Mix & pumped 54 bbls Class G wI 0.2% D46, 0.25% D65, 0.40% D167, .02% XE902 @ 15.8 ppg 5.5 bbls/min @ 470 psi - Dropped top plug wI 20 bbls water fl Dowell - Switched to rig pumps & displaced wI 438 bbls 9.6 ppg LSND mud @ 7 to 3.5 bbls/min @ 340 to 790 psi - bumped plug wI 1240 psi - CIP @ 1041 hrs. Check floats OK Full returns while pumping job - unable to move pipe during job - lost approx. 36 bbls during job RU & test 7" casing to 3500 psi for 30 mins. - pressure bleed down to 3270 psi RD cement head & lines - LD landing jt. - casing elevators & long bails Pull thin wall wear bushing - set & test 7" x 9 5/8" packoff to 5000 psi Change top pipe rams f/7" to 3 1/2' x 6" VBR Test BOPE - pipe rams, blind rams, choke & kill line valves, choke manifold valves, Auto & manuallBQP in TD, floor dart & TIW valves to 250 & 5000 psi - Hydril to 250 & 3500 psi - performed accumulator closure test- Witnessing of test waived by Jeff Jones AOGCC Blow down kill & choke lines Pull test plug set wear bushing - PU drilling bails & 4' DP elevators MU 61/8" BHA - Bit - motor - MWD - orient Motor & MWD - upload MWD - RIH wI NM flex DC's & HWDP to 398' - shallow test MWD OK RIH w/6 1/8" BHA - picking up 4' drill pipe fl shed to 3802' (fill pipe every 2000 ') Continue RIH f/3802' to 5609' w/6 1/8" assembly - picking up 4" drill pipe fl shed (165 jts. total) Continue RIH w/6 1/8" assembly wI DP fl derrick fl 5609' to 11,909' (fill pipe every 2000') Slip & cut drill line 60' - service top drive RU & retest 7" casing to 3500 psi for 15 mins. - held solid - RD Establish circulation - Wash down f/11 ,909' to 11,962' - tag top of cmt. Drill out cement - wiper plugs - float collar@ 12,018' - cement & float shoe @ 12,104' - clean out rat hole to 12,124' Legal Well Name: Common Well Name: Event Name: Contractor Name: Rig Name: CD2-18 CD2-18 ROT - DRILLING doyon1 @ppco.com Doyon 19 Date Sub From - To Hours Code Code Phase 9/15/2003 06:45 - 08:45 08:45 - 10:45 10:45 - 11 :30 0.75 CEMENTOTHR INTRM1 11 :30 - 13:30 2.00 CEMENT PULD INTRM1 13:30 - 14:30 1.00 WELCTL EORP INTRM1 14:30 - 18:00 3.50 WELCTL BOPE INTRM1 18:00 - 19:00 1.00 DRILL OTHR INTRM1 19:00 - 21 :00 2.00 DRILL PULD INTRM1 21 :00 - 00:00 3.00 DRILL TRIP INTRM1 9/16/2003 00:00 - 01 :30 1.50 DRILL TRIP INTRM1 01 :30 - 04:00 2.50 DRILL TRIP INTRM1 04:00 - 05:15 1.25 RIGMNT RSRV INTRM1 05:15 - 06:00 0.75 DRILL OTHR INTRM1 06:00 - 06:30 0.50 DRILL REAM INTRM1 06:30 - 09:00 2.50 CEMENT DSHO INTRM1 09:00 - 09:45 0.75 DRILL DRLG INTRM1 09:45 - 11 :00 1.25 DRILL CIRC INTRM1 11 :00 - 11 :45 0.75 DRILL LOT INTRM1 11 :45 - 14:00 2.25 DRILL CIRC INTRM1 14:00 - 22:30 8.50 DRILL DRLH PROD 22:30 - 00:00 1.50 DRILL DRLH PROD Start: 9/8/2003 Rig Release: 9/23/2003 Rig Number: Spud Date: 9/8/2003 End: Group: Description of Operations . Note - found float collar & float shoe 6' shallow fl casing tally - TD was right on Drill 20' new hole f/12, 124' to 12,144' MD 7273' TVD ADT - .41 hrs. Circulate hole clean for FIT - 218 gpm @ 1530m psi wI 70 RPM's RU - perform FIT - formation leaked off @ 840 psi = 11.8 ppg EMW - RD Change well over f/9.6 ppg LSND to 8.8 ppg FloPro - 5 IIbs/min @ 1710 psi - Shut down & monitor well while cleaning surface equipment Well static Drill61/8" horizontal section f/12,144' to 12,290' (7,277' tvd), ART=2 hrs, AST = 2.5 hrs, UWT = 225K, DWT = 145K, ROT = 180K, press= 1,650 psi, TO= 12,000 ft-Ib 113,000 ft-Ib (on/off). Circulate new mud into well bore, and condition contaminated mud, after a high pressure spike to 2,700 psi (11.3 ppg ECD). Circ btms up with a maximum viscosity of 4-500 seclqt. ECDs dropped from 11.3 ppg to Printed: 10/10/2003 4:31:18 PM Legal Well Name: Common Well Name: Event Name: Contractor Name: Rig Name: . . conocoPhillips Alaska' OperaUons Summaryijeport .. . ... .... CD2-18 CD2-18 ROT - DRILLING doyon1 @ppco.com Doyon 19 Page 60f 8 Start: 9/8/2003 Rig Release: 9/23/2003 Rig Number: Spud Date: 9/8/2003 End: Group: Date From - To Hours Code Sub Phase Code ... 9/16/2003 22:30 - 00:00 1.50 DRILL DRLH PROD 9/17/2003 00:00 - 12:00 12.00 DRILL DRLH PROD 12:00 - 00:00 9/18/2003 00:00 - 12:00 12:00 - 21 :00 12.00 DRILL DRLH PROD 12.00 DRILL DRLH PROD 9.00 DRILL DRLH PROD 21 :00 - 22:00 1.00 DRILL DRLH PROD 22:00 - 00:00 2.00 DRILL CIRC PROD 9/19/2003 00:00 - 02:30 2.50 DRILL WIPR PROD 02:30 - 04: 15 1.75 DRILL WIPR PROD 04:15 - 04:30 0.25 DRILL REAM PROD 04:30 - 12:00 7.50 DRILL DRLH PROD 12:00 - 00:00 9/20/2003 00:00 - 12:00 12"00 DRILL DRLH PROD 12.00 DRILL DRLH PROD Description of Operations 10.1 ppg, EMW. NOTE: 130 bbl of FLO-Pro mud was dumped. Drill 6 1/8" horizontal section f/12,274' to 12,192' MD 7279' TVD ADT - 6.92 hrs.= ART - 5"04 hrs. AST - 1.88 hrs. WOB 10/12 k RPM 80 GPM 225 @ 2230 psi String wt. PU 210 SO 148 Rot 180 Torque on/off btm - 11,500/10,000 ft./lbs. Average ECD - 10.3 ppg Drill 6 1/8" horizontal section f/12,192' MD ( 7279' TVD) to 13,582 (7272' TVD). ADT - 8.64 hrs = ART - 6.35 hrs. AST - 2.29 hrs. WOB 8/1 Ok, RPM 80, GPM 225 @ 2210 psi String wt. PU 210k, SO 145k, Rot 175k Torque on/off bottom - 11,500/10,000 ft-Ib Average ECD - 10.5 ppg Drill 6 1/8" horizontal section f/13,582' to 14,317' MD 7269' TVD ADT - 8.13 hrs. = ART - 6"6 hrs. AST - 1.53 hrs. WOB 10/12 k RPM 50 GPM 225 @ 2380 psi String wt" PU 215 SO 140 Rot 175 Torque on/off btm. - 11,500/10,500 ft./lbs. Average ECD's - 10.5 ppg Drill 6 1/8" horizontal section f/14,317' to 14,926' MD, 7274' TVD ADT - 5.71 hrs. = ART - 4.71 hrs. AST - 1.0 hrs. WOB 10/12 k RPM 85 GPM 225 @ 2480 psi String wt. PU 215 SO 140 Rot 175 Torque on/off btm. - 13,000/12,000 ft-/lbs. Average ECD's - 10.6 ppg Unable to slide. (Need to come up 15' tvd). Increase lubricant content to 3"5%, but still unable to slide" Worked pipe and could not get weight transfer to the bit. Circulated a Hi-Vis + nutplug sweep around, with a +/-30% increase in cuttings returned. Wiper trip f/14,926' to 13,246' - Pumped out w/ 200 gpm @ 1760 psi w/ 80 rpm's Flow check (static) - RIH picking up 51jts" 4" drill pipe f/ shed (pipe needed to drill to possible extended TD) f/13,246' to 14,869' Establish circulation - Wash & ream f/ 14,869' to 14,926' 80 rpm's 225 gpm @ 2020 psi Drill 6 1/8" horizontal section f/14,926' to 15336' MD 7262' TVD WOB - 10/12 k, RPM's 80, GPM 225 @ 2370 psi String wt. PU 220, SO 140, Rot 175 Torque on/off btm. - 12,500/11,500 ft./lbs. ADT - 4.69 hrs" = ART- 3.49 hrs. AST - 1.2 hrs. Drill 6 1/8" horizontal section f/15,336' to 15,857' MD 7242' TVD WOB - 10/12 k, RPM's 80, GPM 225 @ 2,440 psi String wt. PU 225, SO 135, Rot 175 Torque on/off btm. - 13,000/12,000 ft-Ibs. ADT - 7.1 hrs. = ART- 5.29 hrs. AST - 1.81 hrs" Drill 6 1/8" horizontal section f/15,857' to 16,348' MD 7241' TVD ADT - 6"92 hrs. = ART - 3.92 hrs. AST - 3 hrs. WOB 10/15 k RPM's 0/80 GPM 218 @ 2500 psi String wt. PU 220 SO 135 Rot 175 Torque on/off btm. - 13,500/11,500 ftIlbs. Average ECD - 10.9 to 11.1 ppg Printed: 10/10/2003 4:31:18 PM . . ConocoPhillips Alaska Operations Summary Report Page 7 of 8 Legal Well Name: CD2-18 Common Well Name: CD2-18 Spud Date: 9/8/2003 Event Name: ROT - DRILLING Start: 9/8/2003 End: Contractor Name: doyon1 @ppco.com Rig Release: 9/23/2003 Group: Rig Name: Doyon 19 Rig Number: Date ; From - To Hours C d Sub Phase Description of Operations o e : Code. 9/20/2003 12:00 - 17:00 5.00 DRILL DRLH PROD Drill 6 1/8' horizontal section f/16,348' to 16,661' MD (7,249' TVD) ADT - 3.3 hrs" = ART - 2.5 hrs. AST - 0.8 hrs. WOB 9/11 k RPM's 0/80 GPM 218 @ 2,420 psi String wt. PU 225 SO 135 Rot 175 Torque on/off btm. - 13,500/12,000 ftIIbs. Average ECD - 10.8 ppg 17:00 - 00:00 7.00 DRILL DRLH PROD Drill 6 1/8" horizontal section f/16,661' to 17,020' MD (7,250' TVD) ADT - 5.0 hrs. = ART - 3.5 hrs. AST· 1.5 hrs. WOB 9/11 k RPM's 0/80 GPM 218 @ 2,420 psi String wt. PU 225 SO 135 Rot 175 Torque on/off btm. - 13,500/12,000 ftllbs. Average ECD - 10.7 ppg 9/21/2003 00:00 - 12:00 12.00 DRILL DRLH PROD Drill 6 1/8' horizontal section f/17,020' to 17,363' MD 7246' TVD ADT - 8.97 hrs. = ART - 8.36 hrs. AST - .61 hrs. WOB 5/12 k RPM 0/80 GPM 220 @ 2440 psi String wt. PU 235 SO 130 Rot 175 Torque on/off btm - 13,500/12,500 ftllbs. Average ECD 10.9 to 11.1 ppg 12:00 - 20:00 8.00 DRILL DRLH PROD Drill 6 1/8' horizontal section f/17,363' to 18,019' MD 7215' TVD, as per geologist. ADT - 7.24 hrs. = ART - 7.24 hrs. AST - 0.0 hrs. WOB 8/12 k RPM 80 GPM 203 @ 2,430 psi String wt. PU 225 SO 125 Rot 175 Torque on/off btm - 13,500/12,500 ft-Ib Average ECD 11.1 to 11.3 ppg 20:00 - 00:00 4.00 DRILL CIRC PROD Pump 30 bbl Lo-Vis sweep, 40 bbl mud, 110 bbl Hi-Vis sweep. Circulate btms up at 180 GPM when viscous sweeps were pumped around, to stay below 11.4 ECD" RPM at 80, pressure = 2,290 psi. 9/22/2003 00:00 - 00: 15 0.25 DRILL CIRC PROD Finish circulating hole clean for trip 00:15 - 03:00 2.75 DRILL TRIP PROD Flow check - static - POOH w/ pump - 3.5 bbls/min @ 620 psi w/50 rpm's - Hole took 27 bbls more than calc. volume to fill 03:00 - 05:30 2.50 DRILL CIRC PROD Establish circulation - 210 gpm @ 2170 psi - hole started taking fluid @ 200 bbls/hr - slowed pump to 2.5 bbls/min @ 1640 psi· Circ & mix LCM pill 05:30 - 06:15 0.75 DRILL CIRC PROD Pumped 40 bbls LCM pill at 35lbs/bbl (20 #/bbl Mill Fine & 15 #/bbl MI II Med), @ 40 spm and 1540 psi. 06:15 - 07:15 1.00 DRILL TRIP PROD POOH w/ pump f/16, 100' to 15,155' (10 stds) 1.6 bbls/min @ 980 psi 07:15 - 10:15 3.00 DRILL CIRC PROD Flow check - well static - Change well over to 8.8 ppg KCL brine @ 3.8 bbls/min @ 1000 psi - Pumped 35 bbls viscous push pill followed by 8.8 ppg KCL brine - Observed brine @ shakers 35 bbls over calculated volume 10:15 - 12:30 2.25 DRILL TRIP PROD Monitor well - static - POOH on trip tank f/15, 155' to 12,009' - hole taking 4 bbls excess per 5 std. (Note: total loss of Flo-Pro while POOH = 284 bbl). 12:30 - 13:00 0.50 DRILL OBSV PROD Monit well on trip tank - hole taking 10 bblslhr. static 13:00 - 14:00 1.00 DRILL CIRC PROD Spot 35 bbls LCM pill (KCL + Flo Vis+) & 20 bbls dry job 14:00 - 22:00 8"00 DRILL TRIP PROD POOH f/12,009' to 11,304' (7 stds) rack in derrick - POOH - LD excess 4" drill pipe f/11 ,304' to 366'. (Note: total losses while POOH were 50 bbl, static loss rate - 4 bbl/hr). 22:00 - 00:00 2.00 DRILL PULD PROD Stand back HWDP and DCs in derrick, flush BHA, LD bit, motor, change out float, download MWD, PU motor. 9/23/2003 00:00 - 00:30 0.50 DRILL PULD PROD Pull probe, adjust motor, stand back BHA. Printed: 10/10/2003 4:31:18 PM . . . ~ .. .. ConocoPhillips Alaska ... .. Page 8 of 8 Operations Summary Report Legal Well Name: CD2-18 Common Well Name: CD2-18 Event Name: ROT - DRILLING Contractor Name: doyon1 @ppco.com Rig Name: Doyon 19 Date : From - To : Hours Code ¡ Sub: Phase : ~ Code . --...- --. -. ....-.. ..... . .. 9/23/2003 00:30 - 00:45 00:45 - 09:30 0.25 DRILL PULD PROD 8.75 CMPLTN RUNT CMPLTN 09:30 - 10:00 0"50 CMPL TN SOHO CMPL TN 10:00 - 10:30 0.50 CMPL TN NUND CMPL TN 10:30 - 13:00 2.50 CMPL TN NUND CMPL TN 13:00 - 13:30 0.50 CMPL TN NUND CMPL TN 13:30 - 14:00 0.50 CMPL TN DEOT CMPL TN 14:00 - 17:30 3.50 CMPL TN FRZP CMPL TN 17:30 - 18:00 0.50 CMPL TN PCKR CMPL TN 18:00 - 19:30 1.50 CMPL TN DEOT CMPL TN 19:30 - 20:30 20:30 - 21 :00 21 :00 - 22:00 1.00 CMPL TN DEOT CMPL TN 0.50 MOVE RURD CMPL TN 1.00 MOVE RURD CMPL TN Start: 9/8/2003 Rig Release: 9/23/2003 Rig Number: Spud Date: 9/8/2003 End: Group: Description of Operations Pull wear ring. RU to run tubing, PJSM. MU - WLEG - Pup jt. (4 1/2" 12"6# L-80) - XN nipple w/ RHC plug installled - 2 jt.- 4-1/2", 12.6Ib/ft, L-80, IBT-M, R2 tbg - Baker S-3 Packer w/ mill out extension - (all connections below packer Baker-Loc) 2 jts. 41/2" 12.6Ib/ft, L-80, IBT-M tbg - GLM - 195 jts 41/2" 12.6# L-80 IBT-M tbg, Camco DB nipple [3.812" profile], 60 jts 41/2" 12.6Ib-ft, L-80, IBT-M" UWT=185K, DWT=125K PU tubing hanger and land tubing. RILDS. Set TWC and test seals to 5,000 psi. ND BOPE, NU tree. Test adaptor flange to 5,000 psi, test tree to 5,000 psi. LD landing Jt. RU lubricator and pull TWC. RU hardlines to the Annulus and the tree. RU floor manifold. PJSM. Test lines 4,000 psi - Displace well w/ 160 bbls 9.2 brine. Pumped 223 bbls diesel for tbg displacement & freeze protect 2,700' (2,000' TVD) of annulus. Drop roller Ball/Rod with lubricatoL Pressure tubing to 3,800 psi and set packer. Test tubing to 3,700 psi for 30 minutes with the final pressure equal to 3,325 psi. Bleed down the tubing pressure to 800 psi and pressure up the annulus to 3,500 psi and test for 30 minutes. Final pressure = 3,425 psi. Bleed down pressure and clear lines. RD hardlines and manifold. Set BPV w/ lubricatoL Secure tree. RIG RELEASED AT 2200 HRS, 9/23/2003. Printed: 10/10/2003 4:31:18 PM . AOGCC Howard Okland 333 W. 7th Ave. Suite 100 Anchorage, AK 99501 . DEFINITIVE cf~--\Z>" Re: Distribution of Survey Data for Well@2 5& rB1 GYRO Dear: Dear Sir/Madam: Enclosed are two survey hard copies. Tie-on Survey: Window I Kickoff Survey: Projected Survey: 0.00 I MD 'MD 3,233.00' MD (if Applicalble) Please call me at 563-3256 if you have any questions or concerns. Regards, William T. Allen Survey Manager attachments ~~~\,'Ç\ ~ 8(i)3-¡51 30-Sep-03 ~ Sperry-Sun Drilling Services Alaska North Slope North Slope, Alaska Alpine CD-2, Slot Plan: CD2-18 CD2-18 PB1 GYRO Job No. AKF02649344, Surveyed: 21 September, 2003 Survey Report 25 September, 2003 Your Ref: API 501032046670 Surface Coordinates: 5974612" 15 N, 371699.38 E (700 20'19.9353w N, 151002' 27.9765w W) Grid Coordinate System: NAD27 Alaska State Planes, Zone 4 Surface Coordinates relative to Project H Reference: 974612.15 N, 128300.62 W (Grid) Surface Coordinates relative to Structure: 168.91 N, 21.00 W(True) Kelly Bushing: 52. 25ft above Mean Sea Level Elevation relative to Project V Reference: 52. 25ft Elevation relative to Structure: 52. 25ft spef""'lf""'l\l-SUI'! I:3RH.":L.ING SER\.IIc:e:S A Halliburton Company ~~~'«\~ 803-15\ DEFINITIVE . . () c:~r {J:1y Survey Ref: svy299 . I Alaska North Slope Measured Sub-Sea Vertical Depth Incl. Azim. Depth Depth (ft) (ft) (ft) 0.00 0"000 0.000 -52.25 0.00 84.00 0.200 194.000 31.75 84.00 174.50 0.200 275.000 122.25 174.50 267.00 1"250 287.000 214.74 266.99 357.00 3.000 281.000 304.68 356.93 445.00 5500 2nOOO 392.43 444.68 536.00 8.800 268.000 482.71 534.96 625.00 12.400 271.000 570.18 622.43 Sperry..Sun Drilling Services Survey Report for Alpine CD-2 - CD2-18 PS1 GYRO Your Ref: API 501032046670 Job No. AKF02649344, Surveyed: 21 September, 2003 North Slope, Alaska Local Coordinates Northings Eastings (ft) (ft) Global Coordinates Northings Eastings (ft) (ft) Dogleg Vertical Rate Section (O/100ft) Comment 0.00 N 0.00 E 5974612.15 N 371699.38 E 0.00 Tolerable Gyro 0.145 0.04W 5974612.01 N 371699.34 E 0.238 -0" 11 0.285 0.23W 5974611"87 N 371699.14 E 0.287 -0.14 0.03 N 1.36W 5974612.20 N 371698.02 E 1.141 0.66 0.76 N 4.61 W 5974612.99 N 371694.79 E 1.957 2"85 1.72 N 11.05 W 5974614.06 N 371688.36 E 2.859 6.73 2.01 N 22.34 W 5974614.54 N 3716n07 E 3.819 12.31 1.94 N 38.71 W 5974614.75 N 371660"71 E 4.091 19.96 . All data is in Feet (US Survey) unless otherwise stated. Directions and coordinates are relative to True North" Vertical depths are relative to 52' Above MSL. Northings and Eastings are relative to 1746' FNL-1542' FEL. Global Northings and Eastings are relative to NAD27 Alaska State Planes, Zone 4. The Dogleg Severity is in Degrees per 100 feet (US Survey). Vertical Section is from 1746' FNL-1542' FEL and calculated along an Azimuth of 331.860° (True). Magnetic Declination at, Surface is 24.4900(04-Sep-03) Based upon Minimum Curvature type calculations, at a Measured Depth of 625.00ft., The Bottom Hole Displacement is 38.76ft., in the Direction of 272.862° (True). Survey tool program for CD2-18 PS1 GYRO . From Measured Vertical Depth Depth (ft) (ft) To Measured Vertical Depth Depth Survey Tool Description (ft) (ft) 0.00 625"00 622.43 Tolerable Gyro 0.00 25 September, 2003 - 7:44 Page 2 of 2 DrillQuest 3.03.02.002 . AOGCC Howard Okland 333 W. 7th Ave. Suite 100 Anchorage, AK 99501 . DEFINITIVE ê~ - \CC; Re: Distribution of Survey Data for Well 902-55 PB 1 Dear Dear Sir/Madam: Enclosed are two survey hard copies. Tie-on Survey: Window I Kickoff Survey: Projected Survey: 0.00' MD 'MD 3,233.00 I MD (if applicable) Please call me at 273-3545 if you have any questions or concerns. Regards, William 1. Allen Survey Manager Attachment(s) ~~~\,\~ ~63~~ IS ~ 29-Sep-03 . . svy300 Survey Ref: Sperry-Sun Drilling Services Alaska North Slope North Slope, Alaska Alpine CD-2, Slot Plan: CD2-18 CD2-18 PB1 Job No. AKZZ2649344, Surveyed: 6 September, 2003 Survey Report 29 September, 2003 Your Ref: API 501032046670 Surface Coordinates: 5974612.15 N, 371699.38 E (70" 20'19.9353" N, 151" 02' 27.9765" W) Grid Coordinate System: NAD27 Alaska State Planes, Zone 4 Surface Coordinates relative to Project H Reference: 974612.15 N, 128300.62 W (Grid) Surface Coordinates relative to Structure: 168.91 N, 21.00 W (True) Kelly Bushing: 52.25ft above Mean Sea Level Elevation relative to Project V Reference: 52.25ft Elevation relative to Structure: 52.25ft S¡ ·....1 ·""Y-SUf1 DFU,-L-L-ING... . SEiRVIC:Ei.~ A Halliburton Company Sperry-Sun Drilling Services Survey Report for Alpine CD-2 - CD2-18 PS1 Your Ref: API 501032046670 Job No. AKZZ2649344, Surveyed: 6 September, 2003 North Slope, Alaska Alaska North Slope Measured Sub-Sea Vertical Local Coordinates Global Coordinates Dogleg Vertical Depth Incl. Azim. Depth Depth Northings Eastings Northings Eastings Rate Section Comment (ft) (ft) (ft) (ft) (ft) (ft) (ft) (°/1000) 625.00 12.400 271.000 570.18 622.43 1.94 N 38.71 W 5974614"75 N 371660.71 E 19.96 AK-6 BP _IFR-AK 662.63 13.680 271.490 606.84 659.09 2.12 N 47.20 W 5974615.08 N 371652.23 E 3.414 24"13 752.16 17.250 270.690 693.11 745"36 2.56 N 71.06 W 5974615.92 N 371628.37 E 3.995 35.77 841.72 20.720 274.620 777.79 830.04 3.99 N 100.14 W 5974617.86 N 371599.32 E 4.127 50"75 931.09 24.540 272.700 860.26 912.51 6.14 N 134.45 W 5974620.59 N 371565.06 E 4.353 68.83 . 1026.55 31.050 272.000 944.67 996.92 7.94 N 178.90 W 5974623.15 N 371520.64 E 6.828 91.37 1122.18 37.710 273.240 102355 1075.80 10.45 N 232"81 W 5974626.59 N 371466.78 E 7.002 119.02 1216.19 41.830 272.970 1095.79 1148.04 13.70 N 292.85 W 5974630.86 N 371406.81 E 4.386 150.20 1311.77 44.290 272.500 1165Æ2 1217.87 16.81 N 358.03 W 5974635.08 N 371341.69 E 2.596 183.68 1408.86 45.940 273.960 1234.13 1286.38 20.70 N 426.70 W 5974640.15 N 371273.09 E 2.006 219.50 1504.07 49.310 276.430 1298.30 1350.55 27.11 N 496.73 W 5974647.75 N 371203.19 E 4.025 258.17 1597.82 52.570 274.310 1357.37 1409.62 33.89 N 569.19 W 5974655.77 N 371130.86 E 3.895 298.33 1694.29 53.250 270.310 1415.56 1467.81 36.98 N 646.05 W 5974660.17 N 371054.06 E 3.381 337.30 1789.53 52.430 270.160 1473.09 1525.34 37.29 N 721.95 W 5974661.78 N 370978.17 E 0.870 373.37 1884"95 51.530 270.090 1531.86 1584.11 37.45 N 797"12 W 5974663.24 N 370903.01 E 0.945 408.97 1979.69 51.560 269.900 1590.78 1643.03 37.45 N 871.31 W 5974664.50 N 370828.84 E 0.160 443.95 2074"74 53.270 272"100 1648"76 1701.01 38.78 N 946.61 W 5974667.12 N 370753.57 E 2.569 480.64 2168.74 54.340 273.460 1704.27 1756.52 42.46 N 1022.38 W 5974672.10 N 370677.88 E 1.631 519.62 2263.84 54.330 272.170 1759.72 1811.97 46.26 N 1099.55 W 5974677.21 N 370600.79 E 1.102 559.36 2358.91 53.410 271.210 1815.77 1868.02 48.52 N 1176.30 W 5974680.79 N 370524.09 E 1"266 597.56 2454.17 54.240 270.670 1872.00 1924.25 49.78 N 1253.18 W 5974683.37 N 370447.24 E 0.984 634.93 2549.28 52.080 272.410 1929.03 1981.28 51.81 N 1329.26 W 5974686"70 N 370371.20 E 2.702 672.60 . 2644.55 52.740 272.450 1987.14 2039.39 55.01 N 1404.68 W 5974691.19 N 370295.84 E 0.694 711.00 2739.51 53.500 272.980 2044.13 2096.38 58.61 N 148056 W 5974696.09 N 370220.04 E 0"916 749.96 2834.85 54.720 273.350 2100.02 2152.27 62.88 N 1557.68 W 5974701.67 N 370143m E 1.318 790.09 2930.06 53.730 273.070 2155.68 2207.93 67.21 N 1634.80 W 5974707.32 N 370065.97 E 1.067 830.28 3025.57 54.490 2n340 2211.67 2263.92 71.53 N 1712.05 W 5974712.97 N 369988.80 E 0.828 870.53 3120.78 52.940 27U60 2268.02 2320.27 74.56 N 1788.73 W 5974717.31 N 369912.19 E 2.461 909.36 3189.98 52.570 272.490 2309.90 2362.15 76.31 N 1843.79 W 5974720.00 N 369857.17 E 1.621 936.87 3233.00 52.570 272.490 2336.05 2388.30 77.80 N 1877.92 W 5974722.07 N 369823.07 E 0.000 954.28 Projected Survey 29 September, 2003 - 9:35 Page 2 of 3 DrillQuest 3.03.02.005 Sperry-Sun Drilling Services Survey Report for Alpine CO-2 - C02-18 PB1 Your Ref: API 501032046670 Job No. AKZZ2649344, Surveyed: 6 September, 2003 North Slope, Alaska Alaska North Slope All data is in Feet (US Survey) unless otherwise stated. Directions and coordinates are relative to True North. Vertical depths are relative to 52' Above MSL. Northings and Eastings are relative to 1746' FNL-1542' FEL. Global Northings and Eastings are relative to NAD27 Alaska State Planes, Zone 4. The Dogleg Severity is in Degrees per 100 feet (US Survey). Vertical Section is from 1746' FNL-1542' FEL and calculated along an Azimuth of 331.860° (True). Magnetic Declination at Surface is 24.4900(04-Sep-03) . Based upon Minimum Curvature type calculations, at a Measured Depth of 3233.00ft., The Bottom Hole Displacement is 1879.53ft., in the Direction of 272.372° (True). Comments Measured Depth (ft) Station Coordinates TVD Northings Eastings (ft) (ft) (ft) Comment 3233.00 2388.30 77.80 N 1877.92 W Projected Survey Survey tool program for CD?-18 PB1 From Measured Vertical Depth Depth (ft) (ft) To Measured Vertical Depth Depth Survey Tool Description (ft) (ft) . 0.00 625.00 0.00 622.43 625.00 3233.00 622.43 Tolerable Gyro (CD2-18 PB1 GYRO) 2388"30 AK-6 BP _IFR-AK (CD2-18 PB1) 29 September, 2003 - 9:35 Page 3 of 3 OrillQuest 3.03.02.005 . AOGCC Howard Okland 333 W. 7th Ave. Suite 100 Anchorage, AK 99501 . Q~~-\3' Re: Distribution of Survey Data for Well CD2-G5 PB1 MWD Dear Dear Sir/Madam: Enclosed are two survey hard copies. Tie-on Survey: Window I Kickoff Survey: Projected Survey: 0.00' MD 'MD 3,233.00' MD (if applicable) Please call me at 273-3545 if you have any questions or concerns. Regards, William T. Allen Survey Manager Attachment(s) 'K~'D \,\~ 603-)5/ 29-Sep-03 ~ Sperry-Sun Drilling Services Alaska North Slope North Slope, Alaska Alpine CD-2, Slot Plan: CD2-18 CD2-18 PB1 MWD Job No. AKMW2649344, Surveyed: 6 September, 2003 Survey Report 25 September, 2003 Your Ref: API 501032046670 Surface Coordinates: 5974612.15 N, 371699.38 E (70020' 19.9353" N, 151002' 27.9765"11\I) Grid Coordinate System: NAD27 Alaska State Planes, Zone 4 Surface Coordinates relative to Project H Reference: 974612.15 N, 128300.62 W (Grid) Surface Coordinates relative to Structure: 168.91 N, 21.00 W(True) Kelly Bushing: 52. 25ft above Mean Sea Level Elevation relative to Project V Reference: 52. 25ft Elevation relative to Structure: 52. 25ft spal'"""I'"""Y-SUI'1 DRILLING SERVII::ES A Halliburton Company ~ ~;b\{\\~ 8æ-- \S( . . Survey Ref: svy301 Sperry-Sun Drilling Services Survey Report for Alpine CD-2 - CD2-18 PB1 MWD Your Ref: API 501032046670 Job No. AKMW2649344, Surveyed: 6 September, 2003 North Slope, Alaska Alaska North Slope Measured Sub-Sea Vertical Local Coordinates Global Coordinates Dogleg Vertical Depth Incl. Azim. Depth Depth Northings Eastings Northings Eastings Rate Section Comment (ft) (ft) (ft) (ft) (ft) (ft) (ft) (o/100ft) 625.00 12.400 271.000 570" 18 622.43 1.94 N 38.71 W 5974614.75 N 371660.71 E 38.76 MWD Magnetic 662.63 n680 271.580 606.84 659.09 2.13 N 47.19 W 5974615.09 N 371652.23 E 3.419 47.24 752.16 17.250 270.780 693.11 745.36 2.60 N 71 "06 W 5974615.97 N 371628.38 E 3.995 71.10 841 .72 20.720 274.700 777.79 830.04 4.08 N 100.14 W 5974617"94 N 371599.33 E 4.126 100.22 931.29 24.540 273.050 860.45 912.70 6.37 N 134"52 W 5974620.82 N 371564.99 E 4.323 134.67 1026"55 31.050 272.310 944.67 996.92 8.41 N 178.86 W 5974623.62 N 371520.69 E 6.843 179.06 . 1122.18 37.710 273.640 1023.55 1075.80 11.27 N 232.76 W 5974627.40 N 371466.85 E 7"008 233.03 1216.19 4U30 273.540 1095.80 1148.05 15.03 N 292.76 W 5974632.19 N 371406.92 E 4.383 293.15 1311.77 44.290 273.120 1165.63 1217.88 18.82 N 357.91 W 5974637.09 N 371341.85 E 2.591 358.40 1408.86 45.940 274.420 1234.14 1286.39 23.35 N 426.54 W 5974642.79 N 371273"30 E 1.946 427.18 1504.07 49"310 276.580 1298.30 1350.55 30.12N 496.53 W 5974650.77 N 371203.43 E 3.916 497.41 1597.82 52.570 274.950 1357.37 1409.62 37.41 N 568.95 W 5974659.29 N 371131.15 E 3.730 570.10 1694.29 53.250 271.070 1415.57 1467.82 41 .44 N 645"77 W 5974664.63 N 371054.41 E 3.285 647.03 1789.53 52.430 270"760 1473.09 1525.34 42.65 N 721.66 W 5974667.14 N 370978.55 E 0.899 722.89 1884.95 51.530 270.500 1531.87 1584.12 43.48 N 796.83 W 5974669.26 N 370903.41 E 0.967 798.00 1979"69 51.560 270.770 1590.78 1643.03 44.30 N 871.02 W 5974671.35 N 370829.25 E 0.225 872.14 2074.74 53.270 272.910 1648.76 1701.01 46.74 N 946.29 W 5974675.07 N 370754.03 E 2.534 947.44 2168.74 54.340 273.890 1704.27 1756.52 51.24 N 1022.01 W 5974680.87 N 370678.40 E 1.415 1023.29 2263.84 54.330 272.840 1759.72 1811.97 55.78 N 1099.14 W 5974686.72 N 370601.36 E 0.897 1100.55 2358.91 53.410 271.610 1815.78 1868.03 58.76 N 1175.86 W 5974691.02 N 370524.69 E 1.424 1177.33 2454.17 54.240 270.720 1872.00 1924.25 60.32 N 1252.74 W 5974693.90 N 370447.85 E 1.152 1254.19 2549.28 52.080 273.750 1929.04 1981.29 63.26 N 1328.78 W 5974698.14 N 370371.87 E 3.414 1330.29 . 2644.55 52.740 274.000 1987.15 2039.40 68.36 N 1404.10W 5974704.53 N 370296.65 E 0.723 1405.76 2739.51 53.500 273.910 2044.14 2096.39 73.60 N 1479.88 W 5974711.06 N 370220.98 E 0.804 1481.71 2834"85 54.720 274.280 2100.03 2152.28 79.12N 1556.92 W 5974717.90 N 370144.04 E 1.318 1558.92 2930.06 53.730 272.370 2155.69 2207.94 83.61 N 1634.03 W 5974723.70 N 370067.02 E 1.931 1636.16 3025.57 54.490 273.280 2211.68 2263.93 87.42 N 1711.31 W 5974728.84 N 369989.82 E 1.109 1713.53 3120.78 52.940 271.100 2268.03 2320.28 90.37 N 1787.99 W 5974733.10 N 369913.20 E 2.461 1790.27 3189.98 52.570 271.180 2309.91 2362.16 91.47 N 1843.06 W 5974735.14 N 369858.15 E 0.543 1845.33 3233.00 52.570 271.180 2336.06 2388.31 92.17N 1877.22 W 5974736.43 N 369824.01 E 0.000 1879.48 Projected Survey 25 September, 2003 - 8:39 Page 2 of 3 DrillQuest 3.03.02.002 Sperry-Sun Drilling Services Survey Report for Alpine CD-2 - CD2-18 PS1 MWD Your Ref: API 501032046670 Job No. AKMW2649344, Surveyed: 6 September, 2003 Alaska North Slope North Slope, Alaska All data is in Feet (US Survey) unless otherwise stated. Directions and coordinates are relative to True North. Vertical depths are relative to 52' Above MSL. Northings and Eastings are relative to 1746' FNL-1542' FEL. Global Northings and Eastings are relative to NAD27 Alaska State Planes, Zone 4. The Dogleg Severity is in Degrees per 100 feet (US Survey). Vertical Section is from 1746' FNL-1542' FEL and calculated along an Azimuth of 272.811 ° (True)" Magnetic Declination at Surface is 24.4900(04-Sep-03) . Based upon Minimum Curvature type calculations, at a Measured Depth of 3233.00ft., The Bottom Hole Displacement is 1879.48ft., in the Direction of 272.811 ° (True). Comments Measured Depth (ft) Station Coordinates TVD Northings Eastings (ft) (ft) (ft) Comment 3233.00 2388.31 92.17 N 1877.22 W Projected Survey Survey tool program for CD2-18 PB1 MWD Fro m Measured Vertical Depth Depth (ft) (ft) To Measured Vertical Depth Depth Survey Tool Description (ft) (ft) . 0.00 625.00 0.00 622.43 625.00 3233.00 622.43 Tolerable Gyro(CD2-18 PB1 GYRO) 2388"31 MWD Magnetic(CD2-18 PB1 MWD) 25 September, 2003 - 8:39 Page 3 of 3 DrillQuest 3.03.02.002 . AOGCC Howard Okland 333 W. 7th Ave. Suite 100 Anchorage, AK 99501 DEFINITIVE . Re: Distribution of Survey Data for Well CD2-18 Dear: Dear Sir/Madam: Enclosed are two survey hard copies. Tie-on Survey: Window I Kickoff Survey: Projected Survey: 1,026.55' MD 1078' MD 18,019.00' MD (if Applicalble) Please call me at 563-3256 if you have any questions or concerns. Regards, Will iam T. Allen Survey Manager attachments '~~~'ù f'f\ ~ {903-- J51 30-Sep-03 Sperry-Sun Drilling Services Alaska North Slope North Slope, Alaska Alpine CD-2, Slot Plan: CD2-18 CD2-18 . Job No. AKZZ2649344, Surveyed: 21 September, 2003 Survey Report 29 September, 2003 Your Ref: API 501032046600 Surface Coordinates: 5974612.15 N, 371699.38 E (70020'19.9353" N, 151002'27.9765" W) Grid Coordinate System: NAD27 Alaska State Planes, Zone 4 . Surface Coordinates relative to Project H Reference: 974612.15 N, 128300.62 W (Grid) Surface Coordinates relative to Structure: 168.91 N, 21.00 W (True) Kelly Bushing: 52.25ft above Mean Sea Level Elevation relative to Project V Reference: 52.25ft Elevation relative to Structure: 52.25ft S....t:::1 II"""Y-SUI! D FH I... 1...1 N.!'i S II PI \1..1. c: Eli S A Halliburton Company Survey Ref: svy303 Sperry-Sun Drilling Services Survey Report for Alpine CD-2 - CD2-18 Your Ref: API 501032046600 Job No. AKZZ2649344, Surveyed: 21 September, 2003 North Slope, Alaska Alaska North Slope Measured Sub-Sea Vertical Local Coordinates Global Coordinates Dogleg Vertical Depth Incl. Azim. Depth Depth Northings Eastings Northings Eastings Rate Section Comment (ft) (ft) (ft) (ft) (ft) (ft) (ft) (0/100ft) 1026.55 31.050 272.000 944.67 996.92 7.94N 178.90 W 5974623.15 N 371520.64 E 91.37 Tie-on Point 107ROO 34.630 272.710 987.89 1040.14 9.09 N 206.77 W 5974624.78 N 371492"79 E 6.998 105.53 Window Point 1122.19 34.630 274.270 1024.25 1076.50 10.62 N 231.84 W 5974626.74 N 371467.76 E 2"006 118.70 1218.81 40.540 274.820 1100.78 1153.03 15.31 N 290.56 W 5974632.43 N 371409"13 E 6.127 150.52 1313.92 44.040 273.850 1171.13 1223.38 20.12 N 354.36 W 5974638.34 N 371345.41 E 3.743 184.86 . 1409.91 45.850 272.550 1239.07 1291.32 23.90 N 422.06 W 5974643.27 N 371277.79 E 2.114 220.12 1504.58 48.390 271 .800 1303.48 1355.73 26.52 N 491.38 W 5974647.07 N 371208.53 E 2.745 255.12 1599"25 50.360 272.020 1365.12 1417.37 28.92 N 563.19 W 5974650.70 N 371136.77 E 2.088 291.10 1694.49 54.570 272.720 1423.13 1475.38 32.05 N 638.63 W 5974655.13 N 371061.39 E 4.459 329.44 1789.45 56.010 272.810 1477.20 1529.45 35.82 N 716.60 W 5974660.23 N 370983.50 E 1.518 369.53 1884.88 57.080 272.510 1529.81 1582.06 39.51 N 796.13 W 5974665.28 N 370904.04 E U52 410.29 1979.50 56.510 270.890 1581.63 1633.88 41 .86 N 875.26 W 5974668.99 N 370824.97 E 1.554 449.69 2074.81 54.770 270.850 1635.42 1687.67 43"06 N 953.93 W 5974671.53 N 370746.33 E 1.826 487.84 2168.88 53.270 271.570 1690.68 1742.93 44.66 N 1030.03 W 5974674.43 N 370670.27 E 1.711 525.14 2264.17 52.160 271.090 1748.41 1800.66 46.42 N 1105.82 W 5974677.49 N 370594"51 E 1.232 562.44 2359.12 51.230 271.410 1807.26 1859.51 48.05 N 1180.31 W 5974680.39 N 370520.06 E 1m5 599.00 2454.24 52.340 272.410 1866" 11 1918.36 50.54 N 1255.00 W 5974684.16 N 370445.42 E 1.430 636.43 2549.83 50.440 271.110 1925.75 1978.00 52.85 N 1329.66 W 5974687.74 N 370370.82 E 2.254 673.67 2644.91 51.390 271.650 1985.70 2037.95 54.63 N 1403.44 W 5974690.79 N 370297.08 E 1.092 710.03 2739.95 52.100 272.440 2044.54 2096.79 57.30 N 1478.02 W 5974694.73 N 370222.56 E 0.992 747.55 2835.31 52.760 272.640 2102.69 2154.94 60.65 N 155353 W 5974699.37 N 370147.12 E 0.712 786.12 2930.34 53.330 273.260 2159.82 2212.07 64.55 N 1629.37 W 5974704.58 N 370071.36 E 0.795 825.33 . 3025.44 53.410 271.510 2216.56 2268.81 67.73 N 1705.61 W 5974709.05 N 369995.18 E 1.479 864"09 3120.80 53.640 271.410 2273.25 2325.50 69.68 N 1782.27 W 5974712.32 N 369918.57 E 0.256 901.96 3189.33 53.510 271.880 2313.94 2366.19 71.27 N 1837.39 W 5974714.84 N 369863.48 E 0.584 929.35 3245.97 53"960 271.300 2347.45 2399.70 72.53 N 1883.04 W 5974716.89 N 369817.86 E 1.146 951.99 3341.12 54.070 272.820 2403.36 2455.61 75.30 N 1959.98 W 5974720.98 N 369740.98 E 1.298 990.72 3436.45 54.910 273.600 2458.73 2510.98 79.65 N 2037.45 W 5974726.65 N 369663.59 E 1.105 1031.09 3531.72 55.440 273.060 2513.13 2565.38 84.19 N 2115.53W 5974732.53 N 369585.60 E 0.725 1071.92 3627.35 55.950 273.900 2567.03 2619.28 88.99 N 2194.37 W 5974738.67 N 369506.85 E 0.900 1113.33 3722.75 56.430 273.150 2620.12 2672.37 93.86 N 2273.49 W 5974744.90 N 369427.83 E 0.825 1154.94 3817.85 56.900 274.210 2672.38 2724.63 98.96 N 2352.78 W 5974751.35 N 369348.64 E 1.054 1196.83 3913.44 56.990 275.090 2724.52 2776.77 105.46 N 2432.63 W 5974759.21 N 369268.91 E 0.777 1240.21 4009.06 56.870 274.830 2776.69 2828.94 112.38 N 2512.46 W 5974767.51 N 369189.21 E 0.260 1283.97 4104.54 57.230 275.150 2828.63 2880.88 119.35 N 2592.28 W 5974775.84 N 369109.52 E 0.470 1327.76 29 September, 2003 - 9:36 Page 2 of 8 DrillQuest 3.03.02.005 Sperry-Sun Drilling Services Survey Report for Alpine CD-2 - CD2-18 Your Ref: API 501032046600 Job No. AKZZ2649344, Surveyed: 21 September, 2003 North Slope, Alaska Alaska North Slope Measured Sub-Sea Vertical Local Coordinates Global Coordinates Dogleg Vertical Depth Incl. Azim. Depth Depth Northings Eastings Northings Eastings Rate Section Comment (ft) (ft) (ft) (ft) (ft) (ft) (ft) (0/100ft) 4200.06 57.520 274.830 2880.12 2932.37 126.35 N 2672.42 W 5974784.21 N 369029.51 E 0.414 1371.72 4295.33 58.130 275.260 2930.86 2983.11 133.44 N 2752.75 W 5974792.68 N 368949.32 E 0.746 1415.86 4391.17 58.770 275.590 2981.00 3033.25 141.17 N 2834.05 W 5974801.79 N 368868.16 E 0.729 1461.01 4486.32 58.000 275.240 3030"88 3083" 13 148"81 N 2914.72 W 5974810.81 N 368787.63 E 0.868 1505.80 4581.86 56.550 272.830 3082.54 3134.79 154.48 N 2994.88 W 5974817.85 N 368707.58 E 2.609 1548.60 . 4677.44 57.600 272.760 3134.49 3186.74 158.39 N 3075.02 W 5974823.14 N 368627.52 E 1.100 1589.84 4772.90 5R040 273.080 3185.33 3237.58 162.51 N 3155.71 W 5974828.63 N 368546.92 E 0.541 1631.52 4868.41 57.760 273.130 3236.08 3288.33 166.89 N 3236.50 W 5974834.40 N 368466.21 E 0.296 1673.49 4963.98 57.110 270.460 3287.53 3339.78 169.42 N 3316.99 W 5974838.30 N 368385.78 E 2.451 1713.68 5059.21 57.280 269.490 3339.12 3391.37 169.39 N 3397.03 W 5974839.64 N 368305.75 E 0.875 1751.40 5154.46 57.920 269.820 3390"16 3442.41 168.90 N 3477.45 W 5974840.53 N 368225.33 E 0.733 1788.90 5250.01 57.520 270.570 3441.19 3493.44 169.18 N 3558.23 W 5974842.19 N 368144.56 E 0.785 1827.23 5345.54 56.210 270.470 3493.41 3545.66 169.90 N 3638.22 W 5974844.28 N 368064.60 E 1.374 1865.60 5440.99 55.350 270.710 3547.08 3599.33 170.71 N 3717.14 W 5974846.44 N 367985" 70 E 0.925 1903.53 5536.41 55.030 271 .040 3601.56 3653.81 171.91 N 3795.48 W 5974848.98 N 367907.40 E 0.439 1941.53 5631.98 56.370 272.110 3655.41 3707.66 174.09 N 3874.39 W 5974852.50 N 367828.53 E 1.680 1980.66 5726.78 56.880 270.500 3707.57 3759.82 175.89 N 3953.54 W 5974855.66 N 367749.43 E 1.517 2019.57 5822.43 53.120 270.210 3762.42 3814.67 176"38 N 4031.87 W 5974857.49 N 367671.12 E 3.939 2056.95 5917.78 51.990 269.140 3820.39 3872.64 175.95 N 4107.57 W 5974858.36 N 367595.42 E 1.483 2092.27 6012.36 51.050 268.860 3879.24 3931.49 174.66 N 4181.60 W 5974858.34 N 367521.38 E 1.021 2126.05 6108.82 50.630 269.790 3940.16 3992.41 173.78 N 4256.38 W 5974858.73 N 367446.59 E 0.865 2160.54 6204.23 50.310 271.220 4000.88 4053.13 174.42 N 4329.97 W 5974860.64 N 367373.03 E 1.204 2195.81 . 6300.01 51.730 272.940 4061.14 4113.39 177.14N 4404.37 W 5974864.62 N 367298.69 E 2.036 2233.29 6395.39 50.860 272.270 4120.78 4173.03 180.52 N 4478.72 W 5974869.28 N 367224.40 E 1.064 2271.34 6490.95 50.480 272.370 4181.34 4233.59 183.52 N 4552.58 W 5974873.54 N 367150.61 E 0.406 2308.81 6586.56 51.450 272.830 4241.56 4293.81 186.89 N 4626.76 W 5974878.18 N 367076.49 E 1.081 2346.77 6682.41 51.490 272.180 4301.26 4353.51 190"16 N 4701.67 W 5974882.73 N 36700L65 E 0.532 2384.98 6777.47 51.420 272.860 4360.50 4412.75 193.43 N 4775.95 W 5974887.27 N 366927.44 E 0.564 2422.89 6872.93 51.170 272.790 4420.19 4472.44 197.10 N 4850.35 W 5974892.22 N 366853.11 E 0.268 2461.22 6968.73 51.080 273.500 4480.32 4532.57 201.20 N 4924.82 W 5974897.58 N 366778.72 E 0.585 2499.95 7064.10 50.650 273.950 4540.51 4592.76 206.00 N 4998.64 W 5974903.65 N 366705.00 E 0"581 2539.00 7159.67 50.850 273.460 4600.98 4653.23 210"78 N 5072.49 W 5974909.70 N 366631.24 E 0.449 257R04 7255.42 51.250 272.810 4661.17 4713.42 214.85 N 5146.85 W 5974915.04 N 366556.96 E 0.673 2616.70 7350.99 51.270 273.240 4720.98 4773.23 218.79 N 5221.29 W 5974920.24 N 366482.60 E 0.352 2655.27 7446.20 50.910 272.020 4780.78 4833.03 222.19 N 5295"29 W 5974924.91 N 366408.67 E 1.066 2693.17 29 September, 2003 - 9:36 Page 3 of 8 DrillQuest 3.03.02.005 Sperry-Sun Drilling Services Survey Report for Alpine CO-2 - C02-18 Your Ref: API 501032046600 Job No. AKZZ2649344, Surveyed: 21 September, 2003 North Slope, Alaska Alaska North Slope Measured Sub-Sea Vertical Local Coordinates Global Coordinates Dogleg Vertical Depth Incl. Azim. Depth Depth Northings Eastings Northings Eastings Rate Section Comment (ft) (ft) (ft) (ft) (ft) (ft) (ft) (0/100ft) 7541 .53 50.700 272.130 4841.03 4893.28 224.86 N 5369"12 W 5974928.85 N 366334.89 E 0.238 2730"35 7637.19 50.140 270.960 4901.98 4954.23 226.85 N 5442.82 W 5974932.10 N 366261 "24 E 1.110 2766.86 7732.68 50.280 271 .490 4963.09 5015.34 228.42 N 5516.18 W 5974934.93 N 366187.92 E 0.451 2802.84 7828.04 50.180 271.680 5024.09 5076.34 230.45 N 5589.45 W 5974938.21 N 366114.70 E 0.186 2839.18 7923.43 49.860 271 .450 5085"38 5137.63 232.45 N 5662.51 W 5974941.45 N 366041.67 E 0.383 2875.40 . 8017.10 49.380 270.970 5146.07 5198.32 233.95 N 5733.85 W 5974944.18 N 365970.37 E 0.644 2910.37 8114.41 50.110 272.280 5208.95 5261.20 236.07 N 5808.08 W 5974947.56 N 365896" 19 E 1.272 2947.24 8209.85 52.580 275.840 5268.57 5320.82 241.38 N 5882.40 W 5974954.15 N 365821.97 E 3.896 2986"97 8305.24 52.550 275.290 5326.55 5378.80 248.73 N 5957.78 W 5974962.78 N 365746.73 E 0.459 3029.00 8400.54 52.840 275.920 5384.31 5436.56 256.13 N 6033.22 W 5974971.48 N 365671.42 E 0.608 3071.11 8496.02 53.300 275.140 5441.68 5493.93 263.48 N 6109.19 W 5974980"13 N 365595.59 E 0.812 3113.42 8591.49 53.270 273.280 5498.76 5551.01 269.10 N 6185.51 W 5974987.05 N 365519.38 E 1"562 3154.36 8686.83 53.140 273.620 5555"86 5608.11 2n70 N 6261.72 W 5974992.95 N 365443.26 E 0.316 3194.35 8782.63 52.860 273.620 5613.52 5665.77 278.53 N 6338.07 W 5974999.08 N 365367.00 E 0.292 3234.62 8878.00 52.720 272.940 5671.19 5723.44 282.87 N 6413.90 W 5975004.73 N 365291.26 E 0.587 3274.22 8973.52 52.660 270.460 5729.09 5781.34 285.13 N 6489.83 W 5975008.28 N 365215.38 E 2.066 3312.01 9069.16 51.870 268.440 5787"63 5839.88 284.41 N 6565.46 W 5975008.86 N 365139.75 E 1.863 3347.04 9164.90 52.060 268.030 5846.62 5898.87 282.08 N 6640.83 W 5975007.82 N 365064.35 E 0.391 3380.54 9260.42 53.520 267.690 5904"38 5956.63 279.24 N 6716.85 W 5975006.28 N 364988.29 E 1.555 3413.88 9356.37 53.600 269.380 5961.38 6013.63 277.27 N 6794.01 W 5975005.63 N 364911.11 E 1.419 3448.53 9452.11 53.200 269.710 6018.46 6070.71 276.66 N 6870.87 W 5975006.33 N 364834.25 E 0"501 3484.24 9547.34 53.210 271.500 6075.50 6127.75 277.46 N 6947.12 W 5975008.44 N 36475R03 E 1.505 3520.91 . 9642.51 53.940 274.290 6132.02 6184.27 281.34 N 7023.58 W 5975013.63 N 364681.64 E 2.480 3560.39 9737.91 54.560 274.200 6187.75 6240.00 287.07 N 7100.80 W 5975020.68 N 364604.54 E 0.654 3601.85 9833.40 54.810 272.950 6242.96 6295.21 291.93 N 7178.56 W 5975026.86 N 364526.87 E 1.100 3642.81 9929.10 54.370 272.510 6298.41 6350.66 295"64 N 7256.47 W 5975031.91 N 364449.03 E 0.593 3682.83 10024"37 54.210 2n290 6354.01 6406.26 298.88 N 7333.76 W 5975036.47 N 364371.81 E 0.252 3722" 14 10119.71 54.600 270.630 6409.51 6461.76 300.85 N 7411.25 W 5975039.77 N 364294.36 E 1.474 3760.42 10215.05 55.150 270.280 6464.36 6516.61 301.47 N 7489.23 W 5975041.73 N 364216.41 E 0.650 3797.74 10310.21 55.200 269.680 6518.71 6570.96 301.45 N 7567.35 W 5975043.03 N 364138.30 E 0.520 3834.56 10405.95 53.920 270.060 6574.22 6626.47 301.27 N 7645"35 W 5975044.19 N 364060.31 E 1.376 3871.18 10501.68 53.310 271.930 6631.01 6683.26 302.60 N 7722.39 W 5975046.84 N 363983.29 E 1.697 3908.69 10594.79 53.810 275.650 6686.33 6738.58 307"56 N 7797.11 W 5975053.08 N 363908.67 E 3.258 3948.30 10691.70 54550 281.020 6743.07 6795.32 318.96 N 7874.81 W 5975065"81 N 363831.18 E 4.557 3995.00 10787.32 56.110 284.620 6797.48 6849.73 336.43 N 7951.47 W 5975084.58 N 363754.83 E 3.500 4046.55 29 September, 2003 - 9:36 Page 4 of 8 OrillQuest 3.03.02.005 Sperry-Sun Drilling Services Survey Report for Alpine CD-2 - CD2-18 Your Ref: API 501032046600 Job No. AKZZ2649344, Surveyed: 21 September, 2003 North Slope, Alaska Alaska North Slope Measured Sub-Sea Vertical Local Coordinates Global Coordinates Dogleg Vertical Depth Incl. Azim. Depth Depth Northings Eastings Northings Eastings Rate Section Comment (ft) (ft) (ft) (ft) (ft) (ft) (ft) (0/100ft) 10882.69 58.880 288.410 6848.73 6900.98 359.32 N 8028.54 W 5975108"79 N 363678.17 E 4.434 4103.09 10978.33 62]30 292.960 6895.40 6947.65 388.85 N 8106.58 W 5975139.65 N 363600.64 E 5.783 4165.93 11073.86 65.310 296.240 6937.25 6989.50 424.62 N 8184.63 W 5975176.75 N 363523.22 E 4"101 4234.28 11169.23 66.020 299.870 6976.56 7028.81 465.48 N 8261.29 W 5975218.92 N 363447.26 E 3.547 4306.47 11264.44 67.220 303.750 7014.35 7066.60 511.55 N 8335.53 W 5975266.25 N 363373.82 E 3.947 4382.10 . 11360.15 69.450 309.360 7049.71 7101.96 564.52 N 8406.92 W 5975320.44 N 363303.35 E 5.924 4462.48 11455.59 70.910 313.730 7082.08 7134.33 624.06 N 8474.09 W 5975381.12 N 363237.21 E 4.571 4546.66 11551.09 73.120 316.660 7111.57 7163.82 688.51 N 8538.08 W 5975446.65 N 363174.34 E 3.724 4633.66 11647.00 75.230 318.810 7137.73 7189.98 756.79 N 8600.12 W 5975515.98 N 363113.47 E 3.081 4723.14 11742.46 77.670 320.480 7160.10 7212.35 827.51 N 8660.20 W 5975587.72 N 363054.61 E 3.070 4813.83 11837.62 79.780 322.110 7178.70 7230.95 900.33 N 8718.55 W 5975661.53 N 362997"51 E 2]82 4905.56 11932.74 81.320 322.970 7194"32 7246.57 974.81 N 8775.61 W 5975736.97 N 362941. 73 E 1"848 499R 15 12028.05 82.220 324.930 7207.96 7260.21 1051.07 N 8831.12 W 5975814.17 N 362887.54 E 2.244 5091.58 12046.34 82.690 325.460 7210"36 7262.61 1065.96 N 8841.47 W 5975829.23 N 362877.45 E 3.854 5109.58 12158.90 84.740 325.540 7222.69 7274.94 1158.16 N 8904.84 W 5975922.51 N 362815.66 E 1.823 5220"77 12210.47 8R090 328.090 7225.91 7278.16 1201.22 N 8933.00 W 5975966.05 N 362788.24 E 8.158 5272.03 12250.88 88.460 327.120 7227.13 7279.38 1235.33 N 8954.64 W 5976000.52 N 362767.19 E 2.568 5312.31 12296.19 88.400 328.380 7228.37 7280.62 1273.63 N 8978.81 W 5976039.23 N 362743.68 E 2.783 5357.49 12347.03 89570 329.750 7229.27 7281.52 1317.23 N 9004.94 W 5976083.27 N 362718.30 E 3"543 5408.26 12442.80 89.510 329.250 7230.04 7282.29 1399.75 N 9053.54 W 5976166.61 N 362671.11 E 0"526 5503"94 12541.13 90.990 328.110 7229.61 7281.86 1483.75 N 9104.65 W 5976251.47 N 362621.45 E 1.900 5602.11 12636.36 90.800 328.890 7228.12 7280.37 1564.93 N 9154.40 W 5976333.49 N 362573.09 E 0.843 5697.17 . 12732.08 90.620 329.090 7226.94 7279.19 1646.97 N 9203.71 W 5976416.36 N 362525.19 E 0.281 5792.76 12827.45 89.940 328.500 7226.47 7278.72 1728.54 N 9253.12 W 5976498.76 N 362477.19 E 0.944 5887.99 12922.78 90.860 329.540 7225.80 7278.05 1810"26 N 9302.19 W 5976581.31 N 362429.52 E 1.457 5983.20 13018.91 90.740 329.040 7224.46 7276.71 1892.90 N 9351.28 W 5976664.78 N 362381.86 E 0.535 6079.22 13114.06 90.800 328.810 7223.18 7275.43 1974.39 N 9400"39 W 5976747.10 N 362334.15 E 0.250 6174.24 13209.55 90.680 328.940 7221.95 7274.20 2056.13 N 9449.74 W 5976829"67 N 362286"20 E 0.185 6269.59 13304"25 90.680 331.610 7220.83 7273.08 2138.35 N 9496"69 W 5976912.69 N 362240.67 E 2.819 6364.24 13400.61 90.430 331.750 7219.89 7272.14 2223.18 N 9542.40 W 5976998.28 N 362196.41 E 0.297 6460.59 13496.14 90.190 331.080 7219.38 7271.63 2307.06 N 9588.11 W 5977082.93 N 362152.15 E 0.745 6556.12 13591.98 89.940 330.770 7219.27 7271.52 2390.82 N 9634.68 W 5977167.48 N 362107.02 E 0.416 6651.95 13687.46 89.810 331.110 7219.48 7271.73 2474.28 N 9681.06 W 5977251.72 N 362062.07 E 0.381 6747.41 13783.00 89.690 332.080 7219.89 7272" 14 2558.32 N 9726.51 W 5977336.52 N 362018.07 E 1.023 6842.95 13878.03 89.570 332.190 7220"51 7272.76 2642.33 N 9770.92 W 5977421.28 N 361975.10 E 0"171 6937.98 29 September, 2003 - 9:36 Page 5 of 8 DrillQuest 3.03.02.005 Sperry-Sun Drilling Services Survey Report for Alpine CD-2 - CD2-18 Your Ref: API 501032046600 Job No. AKZZ2649344, Surveyed: 21 September, 2003 North Slope, Alaska Alaska North Slope Measured Sub-Sea Vertical Local Coordinates Global Coordinates Dogleg Vertical Depth Incl. Azim. Depth Depth Northings Eastings Northings Eastings Rate Section Comment (ft) (ft) (ft) (ft) (ft) (ft) (ft) (0/100ft) 13973.50 90.680 331.510 7220.30 7272.55 2726.50 N 9815.96 W 5977506.21 N 361931.51 E 1.363 7033A5 14068.97 90.680 331.960 7219.16 7271A1 2810.58 N 9861.17 W 5977591.05 N 361887.75 E 0.471 7128.91 14164.52 90A90 332.770 721R19 7270A4 2895.23 N 9905A9 W 5977676A4 N 361844.88 E 0.871 7224A5 14260.13 90.370 333.170 7217A7 7269.72 2980.39 N 9948.93 W 5977762.34 N 361802.90 E 0.437 7320.04 14355.50 90.250 334.180 7216"96 7269.21 3065.87 N 9991.23 W 5977848"53 N 361762.08 E 1.066 7415.36 . 14451 A7 90.190 333.120 7216"59 7268.84 3151.87N 10033.82 W 5977935"24 N 361720.96 E 1.106 7511.28 14547.08 90.060 331.930 7216.38 7268.63 3236.69 N 10077.93 W 5978020.81 N 361678.31 E 1.252 7606.88 14642.19 90.060 332.090 7216.28 7268.53 3320.68 N 10122.57 W 5978105.54 N 361635.11 E 0.168 7701.99 14737A1 89.880 331. 730 7216.33 7268.58 3404.68 N 10167AOW 5978190.30 N 361591.72 E OA23 7797.21 14833A9 88.210 331.910 7217.93 7270.18 3489.36 N 10212.77 W 5978275.74 N 361547.81 E 1.748 7893.27 14928.00 88.770 333.110 7220A2 7272.67 3573.16 N 10256"38 W 5978360.28 N 361505.64 E 1A01 7987.74 15023.23 91.110 333.500 7220.52 7272" 77 3658.24 N 10299.16 W 5978446.08 N 361464.33 E 2A91 8082.94 15118.86 91 A80 332.770 7218.36 7270.61 3743.52 N 10342.36 W 5978532.09 N 361422"59 E 0.856 8178.52 15214.24 91.910 333.630 7215.54 7267.79 3828.62 N 10385.34 W 5978617.91 N 361381.07 E 1.008 8273"83 15309.98 92.160 333A90 7212.14 7264.39 3914.29 N 10427.95 W 5978704.30 N 361339.94 E 0.299 8369A6 15405A3 92.650 333.320 7208.13 7260.38 3999.57 N 10470.64 W 5978790.29 N 361298.71 E 0.543 8464"80 15499"30 93.210 333.650 7203.33 7255.58 4083A5 N 10512.49 W 5978874.88 N 361258.30 E 0.692 8558.51 15596.56 92.840 333.730 7198.20 7250A5 4170.52 N 10555.54 W 5978962.67 N 361216.75 E 0.389 8655.58 15692.15 92.590 333.630 7193.67 7245.92 4256.10 N 10597.88 W 5979048.96 N 361175.88 E 0.282 8751.01 15787.75 91.050 333.930 7190.64 7242.89 4341.82 N 10640.09 W 5979135.39 N 361135.14 E 1.641 8846.51 15883.19 89.750 334.280 7189.97 7242.22 4427.67 N 10681.77 W 5979221.95 N 361094"94 E 1A11 8941.87 15978.17 90.370 334.710 7189.87 7242.12 4513.39 N 10722.67 W 5979308.36 N 361055.51 E 0.794 9036.75 . 16073.64 89.010 333"820 7190.39 7242.64 4599.39 N 10764.12 W 5979395.05 N 361015.54 E 1 .702 9132.13 16169.16 89.810 333.650 7191.37 7243.62 4685.04 N 10806.39 W 5979481A1 N 360974.74 E 0.856 9227.60 16264.51 90.680 333.900 7190.96 7243.21 4770.58 N 10848.52 W 5979567.65 N 360934.08 E 0.949 9322.89 16360.19 88.210 333.280 7191.89 7244.14 4856.26 N 10891.07 W 5979654.05 N 360893.00 E 2.662 9418.51 16455.56 88.950 332.960 7194.25 7246"50 4941.30 N 10934.18 W 5979739.82 N 360851.35 E 0.845 9513.83 16551.17 89.690 333.300 7195.39 7247.64 5026.58 N 10977.39 W 5979825.83 N 360809.61 E 0.852 9609 A 1 16646.69 90.370 333.840 7195"34 7247.59 5112.12N 11019.90W 5979912.08 N 360768.56 E 0.909 9704.89 16741.54 90.990 332"740 7194"21 7246A6 5196.84 N 11062.53 W 5979997.51 N 360727.39 E 1.331 9799.70 16837.39 88.270 334.000 7194.83 7247.08 5282.51 N 11105A9 W 5980083.91 N 360685.91 E 3.127 9895.50 16932.86 88.890 333.740 7197.20 7249A5 5368.19 N 11147.52 W 5980170"30 N 360645.34 E 0.704 9990.88 17028.16 89.690 333.310 7198.38 7250.63 5453A9 N 11190.00 W 5980256.31 N 360604.33 E 0.953 10086.14 17122.96 89.260 334.830 7199.25 7251.50 5538.74 N 11231.45 W 5980342.26 N 360564"34 E 1.666 10180"86 17218AO 89.200 334.040 7200.53 7252.78 5624.83 N 11272.63 W 5980429.04 N 360524.64 E 0.830 10276.19 29 September, 2003 - 9:36 Page 6 of 8 DrillQuest 3.03.02.005 Sperry-Sun Drilling Services Survey Report for Alpine CO-2 - C02-18 Your Ref: API 501032046600 Job No. AKZZ2649344, Surveyed: 21 September, 2003 North Slope, Alaska Alaska North Slope Measured Sub-Sea Vertical Local Coordinates Global Coordinates Dogleg Vertical Depth Incl. Azim. Depth Depth Northings Eastings Northings Eastings Rate Section Comment (ft) (ft) (ft) (ft) (ft) (ft) (ft) (0/100ft) 17313.97 90.120 334.520 720UO 7253.35 5710.93 N 11314.11 W 5980515.83 N 360484.65 E 1.086 10371.68 17409.38 90.740 334.040 7200.38 7252.63 5796"88 N 11355.51 W 5980602.48 N 360444]2 E 0"822 10467.00 17504.61 91.420 334.560 7198.59 7250.84 5882.68 N 11396.80 W 598068R97 N 360404.90 E 0.899 10562.12 17600.03 92.280 335.090 7195.51 7247.76 5968.99 N 11437.37 W 5980775.96 N 360365.82 E 1.059 10657.36 17694.97 93.330 335.680 7190.86 7243.11 6055.19 N 11476.87 W 5980862.83 N 360327.80 E 1.268 10752.01 . 17790.29 94.200 334.650 7184.60 7236.85 6141.51 N 11516.81 W 5980949.82 N 360289.34 E 1.413 10846.96 17886.29 95.190 334.720 7176.74 7228.99 6228.00 N 11557.72 W 5981037.00 N 360249.91 E 1.034 10942.52 17978.95 96.060 334.820 7167.66 7219"91 6311.41 N 11597.03 W 5981121.07 N 360212.04 E 0.945 11034.62 18019.00 96.060 334.820 7163.43 7215.68 6347.46 N 11613.98 W 5981157.40 N 360195.71 E 0.000 11074.39 Projected Survey All data is in Feet (US Survey) unless otherwise stated. Directions and coordinates are relative to True North. Vertical depths are relative to 52' Above MSL. Northings and Eastings are relative to 1746' FNL-1542' FEL. Global Northings and Eastings are relative to NAD27 Alaska State Planes, Zone 4. The Dogleg Severity is in Degrees per 100 feet (US Survey). Vertical Section is from 1746' FNL-1542' FEL and calculated along an Azimuth of 331.862° (True). Magnetic Declination at Surface is 24.4900(04-Sep-03) Based upon Minimum Curvature type calculations, at a Measured Depth of 18019.00ft., The Bottom Hole Displacement is 13235.36ft., in the Direction of 298.658° (True). Comments . Measured Depth (ft) Station Coordinates TVD Northings Eastings (ft) (ft) (ft) Comment 1026.55 1078.00 18019.00 996.92 1040.14 7215.68 7.94N 9.09N 6347.46 N 178.90 W 206.77 W 11613.98 W Tie-on Point Window Point Projected Survey 29 September, 2003 - 9:36 Page 70f8 OrillQuest 3.03.02.005 Alaska North Slope Survey tool program for CD?-18 From Measured Vertical Depth Depth (ft) (ft) 0.00 625.00 0.00 622.43 29 September, 2003 - 9:36 To Measured Vertical Depth Depth (ft) (ft) 625.00 18019"00 622.43 7215.68 Sperry-Sun Drilling Services Survey Report for Alpine CO-2 - C02-18 Your Ref: API 501032046600 Job No. AKZZ2649344, Surveyed: 21 September, 2003 North Slope, Alaska Survey Tool Description Tolerable Gyro (CD2-18 PB1 GYRO) AK-6 BP _IFR-AK (CD2-18 PB1) . . Page 8 of 8 OrillQuest 3.03.02.005 . . aC,3~-161 30-Sep-03 AOGCC Howard Okland 333 W. 7th Ave. Suite 100 Anchorage, AK 99501 Re: Distribution of Survey Data for Well CD2-18 MWD Dear: Dear Sir/Madam: Enclosed are two survey hard copies. Tie-on Survey: Window I Kickoff Survey: Projected Survey: 1,026.55' MD 1078' MD 18,019.00' MD (if Applicalble) Please call me at 563-3256 if you have any questions or concerns. Regards, Will iam T. Allen Survey Manager attachments -~'~' .. .- \'- \~~" \'\\ ~ '\' Sperry-Sun Drilling Services Alaska North Slope North Slope, Alaska Alpine CD-2, Slot Plan: CD2-18 CD2-18 MWD Job No. AKMW2649344, Surveyed: 21 September, 2003 Survey Report 29 September, 2003 Your Ref: API 501032046600 Surface Coordinates: 5974612.15 N, 371699.38 E (70020' 19.9353B N, 151002' 27.9765" W) Grid Coordinate System: NAD27 Alaska State Planes, Zone 4 Surface Coordinates relative to Project H Reference: 974612.15 N, 128300.62 W (Grid) Surface Coordinates relative to Structure: 168.91 N, 21.00 W (True) Kelly Bushing: 52. 25ft above Mean Sea Level Elevation relative to Project V Reference: 52. 25ft Elevation relative to Structure: 52. 25ft EipE!r"'r"'Y-EiUI! DRIL..L.INS seRVices A Halliburton Company K~~~\\\~ d03-\Sl . . n r-' 'T C):~1 -..;' \, ~ \,,,, Survey Ref: svy302 Sperry-Sun Drilling Services Survey Report for Alpine CD-2 - CD2-18 MWD Your Ref: API 501032046600 Job No. AKMW2649344, Surveyed: 21 September, 2003 North Slope, Alaska Alaska North Slope Measured Sub-Sea Vertical Local Coordinates Global Coordinates Dogleg Vertical Depth Inct Azim. Depth Depth Northings Eastings Northings Eastings Rate Section Comment (n) (n) (n) (n) (n) (n) (n) (O/100n) 1026.55 31.050 272.310 944.67 996.92 8.41 N 178.86 W 5974623.62 N 371520"69 E 91.77 Tie-on Point 1078.00 34.630 272.710 987.89 1040.14 9.64 N 206.73 W 5974625.33 N 371492.84 E 6.971 106.00 Window Point 1122.19 34.630 274.270 1024.26 1076.51 11.17 N 231.80 W 5974627.28 N 371467"81 E 2.006 119.16 1218.81 40.540 274.710 1100.79 1153.04 15.80 N 290.52 W 5974632.91 N 371409.17 E 6.123 150"94 1313.92 44.040 273.060 1171.14 12n39 20.10N 354.36 W 5974638.31 N 371345.42 E 3.860 184.84 1409.91 45.850 274.820 1239.08 1291.33 24.78 N 422"00 W 5974644.14 N 371277.87 E 2.287 220.86 . 1504.58 48.390 274.510 1303.49 1355.74 30.41 N 491.14 W 5974650.96 N 371208"83 E 2.694 258.44 1599.25 50.360 272.410 1365"13 1417.38 34.73 N 562.85 W 5974656.51 N 371137.21 E 2"677 296.06 1694.49 54.570 272.140 1423.14 1475.39 37.72 N 638.30 W 5974660.79 N 371061.82 E 4.426 334.28 1789.45 56.010 272.490 1477.21 1529.46 40.88 N 716.29 W 5974665.28 N 370983.89 E 1.546 373.85 1884.88 57.080 273.200 1529.82 1582.07 44"83 N 795.81 W 5974670.59 N 370904.45 E 1.282 414.84 1979.50 56.510 271.510 1581.64 1633.89 48.09 N 874.91 W 5974675.20 N 370825.42 E 1.611 455.01 2074.81 54.770 271.930 1635.43 1687.68 50.45 N 953.55 W 5974678"91 N 370746.83 E 1.862 494.18 2168.88 53.270 272.520 1690.70 1742.95 53.40 N 1029.61 W 5974683"16 N 370670.83 E 1.673 532.65 2264.17 52.160 271.420 1748.42 1800"67 56.01 N 1105"38W 5974687.07 N 370595.12 E 1 .483 570.68 2359.12 51.230 271.270 1807.28 1859.53 57.76 N 1179.87 W 5974690.09 N 370520.67 E 0.987 607.36 2454.24 52.340 271.590 1866.12 1918.37 59.63 N 1254.58 W 5974693.23 N 370446.00 E 1.197 644.23 2549.83 50.440 270.700 1925.77 1978.02 61.13 N 1329.26 W 5974696.01 N 370371.37 E 2.117 680"77 2644.91 51.390 271.400 1985.71 2037"96 62.48 N 1403.04 W 5974698.63 N 370297.61 E 1.151 716" 77 2739.95 52.100 2n080 2044.56 2096.81 64.75 N 1477.64 W 5974702.17 N 370223.07 E 0.935 753.95 2835.31 52.760 2n320 2102"70 2154.95 67.65 N 1553.17 W 5974706.37 N 370147.60 E 0"720 792" 12 2930.34 53.330 272.960 2159.83 2212.08 71.15 N 1629.02 W 5974711.16 N 370071.81 E 0.806 830.98 . 3025.44 53.410 271.930 2216.57 2268.82 74.41 N 1705.27 W 5974715.72 N 369995.63 E 0.873 869.81 3120"80 53.640 271.620 2273.26 2325.51 76.78 N 1781.91 W 5974719.41 N 369919.04 E 0.356 90R05 3189"33 53.510 272.340 2313.95 2366"20 78.69 N 1837.02 W 5974722.26 N 369863.97 E 0"866 935.72 3245"97 53.960 270.760 2347.46 2399.71 79.92 N 1882.67 W 5974724.27 N 369818.35 E 2.385 958.34 3341.12 54.070 270.410 2403.37 2455.62 80.71 N 1959"66 W 5974726.38 N 369741.39 E 0.319 995"34 3436.45 54.910 272.570 2458.74 2510.99 82.73 N 2037.22 W 5974729.73 N 369663.87 E 2.044 1033.70 3531.72 55.440 273.150 2513.15 2565.40 86.63 N 2115.33 W 5974734.97 N 369585.84 E 0.748 1073.98 3627.35 55.950 275.160 2567.05 2619.30 92.36 N 2194.11 W 5974742.04 N 369507.17 E 1.816 1116.18 3722.75 56.430 273.610 2620.14 2672.39 98.42 N 2273.14 W 5974749.45 N 369428.25 E 1 .441 1158.79 3817.85 56.900 273.030 2672.40 2724.65 103.02 N 2352.46 W 5974755.41 N 369349.02 E 0"710 1200.26 3913.44 56.990 272.270 2724.54 2776.79 106.72 N 2432.50 W 5974760.48 N 369269.07 E 0.673 1241.27 4009.06 56"870 276.230 2776.73 2828.98 112.66 N 2512.38 W 5974767"78 N 369189.30 E 3.473 1284.17 4104.54 57.230 274.910 2828.66 2880.91 120.43 N 2592.12 W 5974776.92 N 369109.70 E 1220 1328.63 29 September, 2003 - 9:18 Page 2 of 8 DrillQuest 3.03.02.005 Sperry-Sun Drilling Services Survey Report for Alpine CD-2 - CD2-18 MWD Your Ref: API 501032046600 Job No. AKMW2649344, Surveyed: 21 September, 2003 North Slope, Alaska Alaska North Slope Measured Sub-Sea Vertical Local Coordinates Global Coordinates Dogleg Vertical Depth Incl. Azim. Depth Depth Northings Eastings Northings Eastings Rate Section Comment (ft) (ft) (ft) (ft) (ft) (ft) (ft) (°/1 OOft) 4200"06 57.520 274.230 2880.16 2932.41 126.84 N 2672.31 W 5974784.70 N 369029.63 E 0.672 1372.10 4295.33 58.130 273.600 2930.89 2983.14 132.35 N 2752.76 W 5974791.58 N 368949"29 E 0.850 1414.90 439U7 58.770 275.470 2981.04 3033.29 138.81 N 2834.17 W 5974799.43 N 368868.00 E 1.792 1458.99 4486.32 58.000 271.800 3030.93 3083.18 143.95 N 2915.02 W 5974805.96 N 368787.25 E 3.383 1501.65 4581.86 56.550 2n 110 3082.58 3134.83 146"69 N 2995.34 W 5974810"08 N 368706.99 E 1.542 1541.95 . 4677.44 57.600 273.260 3134.53 3186.78 150.46 N 3075.48 W 5974815.21 N 368626.93 E 1.492 1583.06 4772.90 58"040 274.180 3185.37 3237.62 155.70 N 3156.10 W 5974821.83 N 368546.40 E 0.937 1625.71 4868.41 57.760 274.190 3236.13 3288.38 161.60 N 3236.80 W 5974829"12 N 368465.82 E 0.293 1668.97 4963.98 57.110 271.350 3287.58 3339.83 165.50 N 3317.23 W 5974834.39 N 368385.46 E 2.595 1710.34 5059.21 57.280 269.850 3339.17 3391.42 166.34 N 3397.27 W 5974836.60 N 368305.46 E 1.336 1748.82 5154.46 57.920 270"800 3390.21 3442.46 166.80 N 34n69 W 5974838.43 N 368225.06 E 1.077 1787.15 5250.01 57.520 271.870 3441.24 3493.49 168.68 N 3558.45 W 5974841"69 N 368144"34 E 1.035 1826.90 5345.54 56.210 271.700 3493.46 3545.71 171.17 N 3638.40 W 5974845.55 N 368064.44 E 1.379 1866.80 5440"99 55"350 271.040 3547.14 3599.39 173.06 N 3717.30 W 5974848.79 N 367985.58 E 1.067 1905.68 5536.41 55.030 271.630 3601.61 3653.86 174.89 N 3795.62 W 5974851.96 N 367907.30 E 0.608 1944.22 5631.98 56.370 272.790 3655.46 3707.71 1n94 N 38R51 W 5974856.36 N 367828.48 E 1.724 1984.11 5726.78 56.880 272.370 3707.61 3759.86 181.50N 3953.60 W 5974861.27 N 367749.47 E 0.653 2024.55 5822.43 53.120 270.890 3762.47 3814.72 183.75 N 4031.90 W 5974864.86 N 367671.22 E 4.130 2063.47 5917.78 51 "990 270.270 3820.44 3872.69 184.52 N 4107.60 W 5974866.93 N 367595.54 E 1.293 2099.84 6012.36 51.050 268.950 3879.29 3931.54 184.02 N 4181.63W 5974867.70 N 367521.51 E 1.477 2134.32 6108.82 50.630 270.070 3940.21 3992.46 183.38 N 4256.42 W 5974868.33 N 367446.72 E 1.000 2169"02 6204.23 50.310 272.110 4000.94 4053.19 184.78 N 4329.99 W 5974870.99 N 367373.19 E 1.683 2204.95 . 6300.01 51.730 273.830 4061.19 4113.44 188"65 N 4404.34 W 5974876.13 N 367298.92 E 2.036 2243.42 6395"39 50.860 272.780 4120.83 4173.08 192.94 N 4478.64 W 5974881.70 N 367224.70 E 1.253 2282.25 6490.95 50.480 272.750 4181.40 4233.65 196.51 N 4552.47 W 5974886.52 N 367150.94 E 0"398 2320.21 658656 51 .450 273.300 4241.61 4293.86 200.43 N 4626"63 W 5974891.71 N 367076.85 E 1.109 2358"65 6682.41 51.490 271.670 4301.32 4353.57 203.68 N 4701.54 W 5974896.25 N 367002.01 E 1.331 2396.84 67n47 51.420 274.200 4360.56 4412.81 207.48 N 4775.78 W 5974901.32 N 366927.85 E 2"083 2435.20 6872.93 51.170 271.450 4420.26 44n51 211.16 N 4850.17 W 5974906.27 N 366853.53 E 2.263 2473.53 6968.73 51.080 272.430 4480.39 4532.64 213.68 N 4924.71 W 5974910"07 N 366779.05 E 0.802 2510.91 7064.10 50.650 274.590 4540.58 4592.83 218.21 N 4998.54 W 5974915.85 N 366705.31 E 1.814 2549.71 7159.67 50.850 273.810 4601.05 4653.30 223.63 N 5072.35 W 5974922.54 N 366631.60 E 0.666 2589.30 7255.42 51.250 272.900 4661.25 4713.50 227.98 N 5146.68 W 5974928.16 N 366557.35 E 0.849 2628.20 7350.99 51.270 273.690 4721.05 4773.30 232.27 N 5221.10 W 5974933.72 N 366483.02 E 0.645 2667.07 7446.20 50.910 271.270 4780.86 4833.11 235.48 N 5295.11 W 5974938.19 N 366409.08 E 2.014 2704.80 29 September, 2003 - 9:18 Page 3 of 8 DrillQuest 3.03.02.005 Sperry-Sun Drilling Services Survey Report for Alpine CD-2 - CD2-18 MWD Your Ref: API 501032046600 Job No. AKMW2649344, Surveyed: 21 September, 2003 North Slope, Alaska Alaska North Slope Measured Sub-Sea Vertical Local Coordinates Global Coordinates Dogleg Vertical Depth Incl. Azim. Depth Depth Northings Eastings Northings Eastings Rate Section Comment (ft) (ft) (ft) (ft) (ft) (ft) (ft) (0/100ft) 7541.53 50.700 271 "530 4841.10 4893.35 237.28 N 5368"97 W 5974941.26 N 366335.26 E 0.305 2741.22 7637.19 50.140 27U70 4902.05 4954.30 238.95 N 5442"67 W 5974944.20 N 366261.59 E 0.693 2777.46 7732.68 50.280 271.890 4963.17 5015.42 240.85 N 5516.02 W 5974947.35 N 366188.29 E 0.676 2813.72 7828.04 50.180 271.210 5024.17 5076.42 242.83 N 5589.29 W 5974950.58 N 366115.06 E 0.558 2850.03 7923.43 49.860 271.590 5085.46 5137.71 244.62 N 5662.36 W 5974953.62 N 366042.03 E 0.454 2886.06 . 8017.10 49.380 271.320 5146.14 5198.39 246.43 N 5733.69 W 5974956.65 N 365970.74 E 0.557 2921.30 8114.41 50.110 273.220 5209.03 5261.28 249"38 N 5807"89 W 5974960.87 N 365896.60 E 1.668 2958.89 8209.85 52.580 276.050 5268.65 5320.90 255.43 N 5882.16 W 5974968"19 N 365822.45 E 3.472 2999.25 8305.24 52.550 275"750 5326"63 5378.88 263.22 N 5957.50 W 5974977.27 N 365747.26 E 0.252 3041.65 8400.54 52.840 276.750 5384.39 5436.64 271.47 N 6032"85 W 5974986"81 N 365672.06 E 0"888 3084.46 8496.02 53.300 275.280 5441.76 5494.01 279.47 N 6108.75 W 5974996"10 N 365596.30 E 1.322 3127.31 8591.49 53.270 273.920 5498.83 5551.08 285.60 N 6185.03 W 5975003.54 N 365520.14 E 1.142 3168.69 868M3 53.140 273.920 5555.94 5608.19 290.82 N 6261.20 W 5975010.06 N 365444.07 E 0.136 3209.21 8782.63 52.860 274.480 5613.59 5665.84 29M3 N 6337.50 W 5975016.97 N 365367.88 E 0.551 3250.14 8878.00 52.720 273.800 5671.27 5723.52 301.91 N 6413.26 W 5975023.75 N 36529222 E 0.587 3290.70 8973.52 52"660 271.460 5729.17 5781.42 305.40 N 6489.14 W 597502853 N 365216.41 E 1.949 3329.56 9069.16 51.870 269.440 5787.71 5839.96 306"00 N 6564.77 W 5975030.43 N 365140.80 E 1.863 3365.76 9164.90 52.060 268.210 5846.70 5898.95 304.45 N 6640.16 W 5975030.17 N 365065.40 E 1.031 3399.95 9260.42 53.520 269"510 5904.46 5956.71 302.94 N 6716.22 W 5975029.97 N 364989.33 E 1.874 3434.49 9356.37 53.600 269.510 5961.45 6013.70 302"28 N 6793.40 W 5975030"63 N 364912.14 E 0.083 3470.31 9452.11 53.200 269.580 6018.54 6070.79 301.67 N 6870.26 W 5975031.33 N 364835.29 E 0.422 3506.01 9547.34 53.210 271.020 6075.58 6127.83 302.07 N 6946.52 W 5975033"04 N 364759.05 E 1.211 3542.33 . 9642.51 53.940 274.410 6132.10 6184.35 305.71 N 7022.99 W 5975037.98 N 364682.65 E 2.967 3581.60 9737.91 54.560 274.380 6187"83 6240"08 31U4 N 7100.18 W 5975045.24 N 364605.57 E 0.650 3623.24 9833.40 54.810 272.690 6243.04 6295.29 316.45 N 7177.95 W 5975051.37 N 364527.90 E 1 .468 3664.14 9929.10 54.370 272.670 6298.49 6350.74 320.09 N 7255.86 W 5975056.35 N 364450.06 E 0.460 3704.10 10024.37 54.210 273.020 6354.09 6406.34 323.93 N 7333.12 W 5975061.51 N 364372.87 E 0.342 3743.93 10119.71 54.600 271.610 640959 6461.84 327.06 N 7410.58 W 5975065.96 N 364295.48 E 1.270 3783.21 10215.05 55.150 270.880 6464.44 6516"69 328.75 N 7488.54 W 5975068.99 N 364217.56 E 0.851 3821.47 10310.21 55.200 269.440 6518.79 6571.04 328.97 N 7566.66 W 5975070.54 N 364139.46 E 1.243 3858.50 10405.95 53.920 270.570 6574.30 6626.55 328.97 N 7644.65 W 5975071.88 N 364061.48 E 1.647 3895.29 10501.68 53.310 272.030 6631.09 6683.34 330.72 N 7721.70 W 5975074.94 N 363984.47 E 1.383 3933.16 10594.79 53"810 275.330 6686.41 6738.66 335.53 N 7796.43 W 5975081 "03 N 363909.83 E 2.901 3972.65 10691.70 54.550 280.830 6743.15 6795.40 346"59 N 7874.18 W 5975093.42 N 363832.29 E 4.664 4019.06 10787"32 56.110 284.070 6797.55 6849.80 363.56 N 7950.94 W 5975111.70N 363755.82 E 3.229 4070.23 29 September, 2003 - 9:18 Page 4 of 8 DrillQuest 3.03.02.005 Sperry-Sun Drilling Services Survey Report for Alpine CD-2 - CD2-18 MWD Your Ref: API 501032046600 Job No. AKMW2649344, Surveyed: 21 September, 2003 North Slope, Alaska Alaska North Slope Measured Sub-Sea Vertical Local Coordinates Global Coordinates Dogleg Vertical Depth Incl. Azim. Depth Depth Northings Eastings Northings Eastings Rate Section Comment (ft) (ft) (ft) (ft) (ft) (ft) (ft) (0/100ft) 10882.69 58.880 288.930 6848.82 6901.07 386.44 N 8028.00 W 5975135.89 N 363679" 16 E 5.186 4126.75 10978"33 62.730 292.810 6895.48 6947.73 416.22 N 8105.96 W 5975167.00 N 363601.73 E 5.361 4189.77 11073.86 65.310 296.860 6937.33 6989.58 452.30 N 8183.85 W 5975204.42 N 363524.46 E 4.670 4258.32 1116923 66.020 300.590 6976.64 7028.89 494"06 N 8260.03 W 5975247.47 N 363449.01 E 3.640 4331.07 11264.44 67.220 305.550 7014.45 7066.70 541.74N 8333.23 W 5975296.40 N 363376.64 E 4.945 4407.64 . 11360.15 69.450 312.050 7049.81 7102.06 597.47 N 8402.47 W 5975353.30 N 363308.36 E 6.727 4489.43 11455"59 70.910 314.420 7082.17 7134.42 658.97 N 8467"87 W 5975415.91 N 363244.02 E 2.792 4574.51 11551.09 73.120 320.170 7111.68 7163.93 725.70 N 8529.42 W 5975483.69 N 363183.62 E 6"176 4662.38 11647.00 75.230 32U20 7137.84 7190.09 797.30 N 8587.61 W 5975556.27 N 363126.66 E 2.637 4752.96 11742.46 77.670 322.440 7160"20 7212.45 870.46 N 8644.70 W 5975630.40 N 363070"84 E 2.689 4844.40 11837.62 79.780 322.880 7178.81 7231.06 944.65 N 8701.30 W 5975705.55 N 363015.51 E 2.263 4936.51 11932.74 81.320 324.030 7194.42 7246.67 1020.03 N 8757.17 W 5975781.87 N 362960.94 E 2.011 5029.33 12028.05 82.220 326.070 7208.07 7260.32 1097.34N 8811.20W 5975860.10 N 362908.24 E 2.319 5122.99 12046.34 82.690 326.760 7210.47 7262"72 1112.45 N 8821.23 W 5975875.37 N 362898.47 E 4.538 5141.04 12158.90 84.740 326"630 7222"79 7275.04 1205.95 N 8882.66 W 5975969.91 N 362838.65 E 1.825 5252.46 12210.47 88.090 330.010 7226.02 7278.27 1249.74 N 8909.68 W 5976014"16 N 362812.38 E 9.218 5303.82 12250.88 88.460 328.770 7227.23 7279.48 1284.50 N 8930.25 W 5976049.27 N 362792.41 E 3.201 5344.17 12296.19 88.400 331.360 7228.47 7280.72 1323.75 N 8952.85 W 5976088.89 N 362770.49 E 5.716 5389.44 12347.03 89"570 332.810 7229.37 7281.62 1368.66 N 8976.65 W 5976134.21 N 362747.46 E 3.664 5440.27 12442.80 89.510 333.960 7230" 14 7282"39 1454.28 N 9019.55 W 597622055 N 362706.03 E 1.202 5536.00 12541.13 90.990 333.960 7229.71 7281.96 1542.63 N 9062.72 W 5976309.62 N 362664.39 E 1.505 5634.26 12636.36 90.800 330.810 7228.23 7280.48 1626.99 N 9106.85 W 5976394.72 N 362621.71 E 3"313 5729.46 . 12732.08 90.620 330.590 7227.04 7279.29 1710.45 N 9153.69 W 5976478.98 N 362576.30 E 0.297 5825.15 12827.45 89.940 328"570 7226.57 7278.82 1792.69 N 9201.97 W 5976562.03 N 362529.43 E 2.235 5920.44 12922.78 90.860 330.510 7225.91 7278" 16 1874.86 N 9250.29 W 5976645.01 N 362482.52 E 2.252 6015.68 13018.91 90.740 327.940 7224.57 7276.82 1957.43 N 9299.47 W 5976728.42 N 362434.76 E 2.676 6111.69 13114.06 90.800 326.120 7223.29 7275.54 2037.25 N 9351.25 W 5976809.11 N 362384.36 E 1 "914 6206.49 13209.55 90.680 329.470 7222.05 7274.30 2118.03 N 9402.13 W 5976890"75 N 362334.87 E 3.510 6301.72 13304.25 90.680 333.960 7220.93 7273.18 2201.40 N 9446.99 W 5976974.87 N 362291.44 E 4.741 6396"39 13400.61 90.430 334.750 7220.00 7272.25 2288.26 N 9488.69 W 5977062.43 N 362251.24 E 0.860 6492.65 13496.14 90.190 334.900 7219.48 7271.73 2374.71 N 9529.32 W 5977149.57 N 362212.08 E 0.296 6588.05 13591.98 89.940 332.120 7219.37 7271.62 2460.48 N 95n07 W 5977236.06 N 362170"81 E 2.912 6683.85 13687.46 89.810 336.050 7219.58 7271.83 2546.34 N 9613.79 W 5977322.62 N 362130.57 E 4.118 6779.23 13783.00 89.690 335.290 7220.00 7272.25 2633.40 N 9653.15 W 5977410.33 N 362092.70 E 0.805 6874.56 13878.03 89.570 335.360 7220.61 7272.86 2719.75 N 9692.82 W 5977497.35 N 362054.52 E 0.146 6969.42 29 September, 2003 - 9:18 Page 50f8 DrillQuest 3.03.02.005 Sperry-Sun Drilling Services Survey Report for Alpine CD-2 - CD2-18 MWD Your Ref: API 501032046600 Job No. AKMW2649344, Surveyed: 21 September, 2003 North Slope, Alaska Alaska North Slope Measured Sub-Sea Vertical Local Coordinates Global Coordinates Dogleg Vertical Depth IncL Azim. Depth Depth Northings Eastings Northings Eastings Rate Section Comment (ft) (ft) (ft) (ft) (ft) (ft) (ft) (0/100ft) 13973.50 90.680 332.510 7220.40 7272.65 2805.50 N 9734.76 W 5977583.81 N 362014.05 E 3.204 7064.81 14068.97 90.680 332" 11 0 7219.27 7271.52 2890.03 N 9779.12 W 5977669.08 N 361971.14 E 0.419 7160.27 14164.52 90.490 334.490 7218.29 7270.54 2975.38 N 9822.05 W 5977755.16 N 361929.68 E 2.499 7255.78 14260.13 90.370 335.130 7217.58 7269.83 3061.89 N 9862.74 W 5977842.36 N 361890.47 E 0.681 7351.26 14355"50 90.250 336.000 7217.06 7269.31 3148.72 N 9902.19 W 5977929.84 N 361852.51 E 0"921 7446.43 . 14451.47 90.190 335.170 7216.69 7268.94 3236.11 N 9941"86 W 5978017.90 N 361814.35 E 0.867 754220 14547.08 90.060 331.590 7216.48 7268"73 3321.57 N 9984.69 W 5978104.08 N 361772.98 E 3.747 7637.76 14642.19 90.060 331.700 7216"38 7268.63 3405.27 N 10029.87 W 5978188"54 N 361729.25 E 0.116 7732.87 14737.41 89.880 330.740 7216.43 7268.68 3488.72 N 10075.71 W 5978272.77 N 361684.84 E 1.026 7828.08 14833.49 88.210 332.160 7218.03 7270.28 3573.10 N 10121.62 W 5978357.92 N 361640.38 E 2.281 7924.14 14928.00 88.770 333.780 7220"52 7272.77 3657.26 N 10164.55 W 5978442.80 N 361598.89 E 1.813 8018"59 15023.23 91.110 335.100 7220.62 7272.87 3743.16 N 10205.64 W 5978529.39 N 361559.29 E 2.821 8113.72 15118.86 91.480 335.080 7218.46 7270.71 3829.87 N 10245.90 W 5978616.78 N 361520.51 E 0.387 8209.17 15214.24 91.910 335.250 7215.64 7267.89 3916.39 N 10285.95 W 5978703.97 N 361481.95 E 0.485 8304.35 15309.98 92.160 335.750 7212.24 7264.49 4003.46 N 10325"62 W 5978791.70 N 361443.77 E 0.584 8399.84 15405.43 92.650 334.110 7208"24 7260.49 4089.84 N 10366.03 W 5978878.76 N 361404.85 E 1"792 8495.06 15499.30 93.210 333.840 7203.44 7255.69 4174.08 N 10407"16 W 5978963.69 N 361365.16 E 0.662 8588.75 15596.56 92.840 332.180 7198.30 7250.55 4260.62 N 10451.24 W 5979050.97 N 361322.57 E 1.746 8685.85 15692.15 92.590 334.590 7193.78 7246"03 4345.98 N 10494.01 W 5979137.05 N 361281.27 E 2.532 8781.29 15787.75 91.050 335.450 7190.74 7242.99 4432.59 N 10534.36 W 5979224.34 N 361242.40 E 1.845 8876.69 15883" 19 89.750 336.140 7190.07 7242.32 4519.63 N 10573.49 W 5979312.04 N 361204.77 E 1.542 8971.90 15978.17 90.370 338.190 7189.97 7242.22 4607"16 N 10610.35 W 5979400" 19 N 361169.42 E 2.255 9066.4 7 . 16073.64 89"010 335.130 7190.49 7242.74 4694.81 N 10648" 17 W 5979488.47 N 361133.10 E 3.507 9161 "59 16169.16 89.810 335.580 7191.47 7243.72 478U2 N 10688.00 W 5979575.95 N 361094.77 E 0.961 9256.93 16264.51 90.680 337.280 7191.07 7243.32 4869"01 N 10726.12 W 5979663.98 N 361058.14 E 2"003 9351.97 16360.19 88.210 334.810 7191.99 7244.24 4956.43 N 10764.96 W 5979752.05 N 361020.80 E 3.651 9447.38 16455.56 88.950 334.350 7194.36 7246.61 5042.54 N 10805.89 W 5979838.85 N 360981.36 E 0"914 9542"61 16551.17 89.690 333" 160 7195.49 7247.74 5128.29 N 10848.16 W 5979925.31 N 360940.55 E 1 .466 9638.16 16646.69 90.370 334.340 7195.44 7247.69 5213.96 N 10890.41 W 5980011.68 N 360899.78 E 1 .426 9733.62 16741.54 90.990 332.240 7194.32 7246.57 5298.67 N 10933.04 W 5980097.12 N 360858.61 E 2.308 982M3 16837.39 88.270 333.620 7194.94 7247.19 5384.01 N 10976.65 W 5980183.19 N 360816.46 E 3.182 9924.25 16932.86 88.890 334.990 7197.30 7249.55 5470.01 N 11018.03 W 5980269.89 N 360776.56 E 1.575 10019.60 17028.16 89"690 335.360 7198.48 7250.73 5556.50 N 11058.04 W 5980357.05 N 360738.04 E 0.925 10114.73 17122.96 89.260 337"050 7199"35 7251.60 5643.23 N 11096.28 W 5980444.42 N 360701.28 E 1.839 10209.25 17218.40 89.200 334.440 7200"63 7252.88 5730.23 N 11135.48 W 5980532.08 N 360663.58 E 2.735 10304.46 29 September, 2003·9:18 Page 6 of8 DrillQuest 3.03.02.005 Sperry-Sun Drilling Services Survey Report for Alpine CD-2 - CD2-18 MWD Your Ref: API 501032046600 Job No. AKMW2649344, Surveyed: 21 September, 2003 North Slope, Alaska Alaska North Slope Measured Sub-Sea Vertical Local Coordinates Global Coordinates Dogleg Vertical Depth Incl. Azim. Depth Depth Northings Eastings Northings Eastings Rate Section Comment (ft) (ft) (ft) (ft) (ft) (ft) (ft) (0/100ft) 17313.97 90.120 339.860 7201.20 7253.45 5818.27 N 11172.58 W 5980620.74 N 360627"99 E 5.752 10399.58 17409.38 90.740 336.830 7200.48 7252.73 5906.93 N 11207.78 W 5980709.99 N 360594.31 E 3.241 10494.37 17504.61 91.420 335.200 7198.69 7250.94 5993.92 N 11246.48 W 5980797.63 N 360557.10 E 1.854 10589.33 17600.03 92"280 336"650 7195.61 7247.86 6080.99 N 11285.39 W 5980885.35 N 360519.70 E 1.766 10684.46 17694.97 93"330 336.930 7190.96 7243"21 6168.14 N 11322.76W 5980973.13 N 360483.82 E 1.145 10778.93 . 17790.29 94.200 335.400 7184.70 7236.95 6255" 14 N 11361.19W 5981060.77 N 360446.88 E 1.843 1 0873.77 17886.29 95" 190 335.250 7176.85 7229.10 6342.08 N 11401.13 W 5981148.38 N 360408.43 E 1.043 10969.27 17978.95 96.060 334.710 7167.76 7220.01 6425.64 N 11440.13 W 5981232.60 N 360370.87 E 1.104 11061.35 18019.00 96.060 334.710 7163.54 7215.79 6461 "65 N 11457.15W 5981268.89 N 360354.47 E 0"000 11101.13 Projected Survey All data is in Feet (US Survey) unless otherwise stated. Directions and coordinates are relative to True North. Vertical depths are relative to 52' Above MSL. Northings and Eastings are relative to 1746' FNL-1542' FEL. Global Northings and Eastings are relative to NAD27 Alaska State Planes, Zone 4. The Dogleg Severity is in Degrees per 100 feet (US Survey). Vertical Section is from 1746' FNL-1542' FEL and calculated along an Azimuth of 331.862° (True). Magnetic Declination at Surface is 24.4900(04-Sep-03) Based upon Minimum Curvature type calculations, at a Measured Depth of 18019.00ft., The Bottom Hole Displacement is 13153.67ft., in the Direction of 299.422° (True). Comments . Measured Depth (ft) Station Coordinates TVD Northings Eastings (ft) (ft) (ft) Comment 1026.55 1078.00 18019.00 996"92 1040.14 7215.79 8.41 N 9.64 N 6461.65 N 178.86 W 206.73 W 11457.15 W Tie-on Point Window Point Projected Survey 29 September, 2003 - 9:18 Page 7 of 8 DrillQuest 3.03.02.005 ~ Alaska North Slope Sperry-Sun Drilling Services Survey Report for Alpine CD-2 - CD2-18 MWD Your Ref: API 501032046600 Job No. AKMW2649344, Surveyed: 21 September, 2003 North Slope, Alaska Survey tool program for CD2-18 MWD From Measured Vertical Depth Depth (ft) (ft) 0.00 625.00 To Measured Vertical Depth Depth Survey Tool Description (ft) (ft) 0.00 625.00 622.43 18019.00 622.43 Tolerable Gyro (CD2-18 PB1 GYRO) 7215.79 MWD Magnetic (CD2-18 PB1 MWD) . 29 September, 2003 - 9:19 . Page 8 of8 DrillQuest 3.03.02.005 Re: CD~-18 Injector SCMT Bond Log Delay e - Subject: Re: CD2-18 Injector SCMT Bond Log Delay From: Clifford L Crabtree <c.L.Crabtree@conocophillips.com> Date: Mon, 13 Oct 2003 15:04:13 -0800 To: Tom Maunder <tom _ maunder@admin.state.ak. us> Tom Here is the 1320 plot for CD2-18 (See attached file: CD2-18 1320 p1ot.pdf) Cliff Crabtree ConocoPhillips Alaska Inc.- Alpine Subsurface Development Office: (907) 265-6842; Cell: (907) 240-5357 Emai1: Fax:: (907) 265-1515 on 10/13/2003 03:03 PM ----- Jerry C Dethlefs 10/13/2003 02:34 PM To: Clifford L Crabtree/PPCO@Phillips, Hai L Hunt/PPCO@Phillips cc: Brian J Odell/PPCO@Phillips, Jerry C Dethlefs/PPCO@Phillips Subject: Re: CD2-18 Injector SCMT Bond Log Delay Cliff & Hai: See AOGCC approval below to go ahead and put CD2-18 on injection prior to the SCMT. We will plan on doing the log as soon as the rig moves. Call if you have any questions. Jerry Dethlefs Problem Well Supervisor ConocoPhillips Alaska ----- Forwarded by Jerry C Dethlefs/PPCO on 10/13/2003 02:14 PM ----- Tom Maunder 10/13/2003 01:56 PM To: Jerry C Dethlefs/PPCO@Phillips cc: Subject: Re: CD2-18 Injector SCMT Bond Log Delay lof2 1/15/2004 8:05 AM Re: CD2,-18 Injector SCMT Bond Log Delay e e " , Hi Jerry, I have looked at the information provided regarding CD2-18. The job log indicates that they were not able to reciprocate the casing and lost a li ttle fluid, but that is not really remarkable. The only well logs I have seen from Alpine where there was questionable cement/isolation were those recent ones where significant lost circulation was experienced. Your proposal to delay the log and initiate water injection is acceptable. This approval is for WATER ONLY. Any change to MI cannot be made until the required bond log has been obtained and submitted to the Commission. Please call with any questions. Tom Maunder, PE AOGCC Jerry C Dethlefs wrote: Tom: As per our discussion over the weekend, I would like approval to delay the SCMT bond log on Alpine well CD2-l8 for a few weeks. Doyon 19 will be moving over the well and there is not enough time to prep the well for injection and perform the bond log prior to the move. By all indications the production casing cement job was successful and the completion was run and tested good. Attached is the cementing summary excerpt from the Daily Drilling Report and the well handover form. Operations would like to get this well on injection as quickly as possible and preferably not wait for the next well to be drilled. Our intent will be to log the SCMT bond log as soon as the drilling rig has again (See attached file: CD2-l8 well handover.xls) (See attached file: CD2-18 Cementing Log.doc)exposed the wellhead. Drop me a line when you get a minute to review this request. Thanks for the help. Jerry Dethlefs Problem Well Supervisor ConocoPhillips Alaska ------------------------------------------------------------------------ Name: CD2-l8 well handover.xls CD2-18 well handover.xls Type: EXCEL File (application/msexcel) Encoding: base64 Name: CD2-l8 Cementing Log.doc CD2-l8 Cementing Log.doc Type: WINWORD File (application/msword) Encoding: base64 (See attached file: tom_maunder.vcf) CD2 18 f Content-Type: application/pdf - 1320 plot.pd Content-Encoding: base64 Content-Type: application/octet-stream tom maunder.vcf Content-Encoding: base64 1 of2 V15!2004 8:Q5 AM · tit ConocoPhillips Alaska Summary Report for: CD2-18 Operations Summary for event: Rotary Drilling 9/15/2003 Circulate & condition mud & hole for cement job - 5 bbls/mln 700 psi final - PJSM e pumps up slowly to Cement 7" casing as follows: Pumped 5 bbls CW100 - Test lines to 3500 - Pumped 15 bbls Cwl00 7, ppg 5 bbls/min 680 psi - Pumped 50.5 bbls Mud Push XL 75 ppg 6 bbls/min 600 psi - Dropped bottom plug - Mix pumped 54 bbls Class G wi 0, D46, O. D65, OAoo/o D167, XE902 15,8 ppg 5.5 bbls/mln @ 470 psi - Dropped top plug wi 20 bbls water fl Dowell - Switched to rig pumps & displaced wi 438 bbls 9.6 ppg LSND mud @ 7 to 3,5 bbls/min 340 to psi - bumped plug wi 1240 psi - CIP 1041 hrs. Check floats OK FUll returns while pumping job - unable to move pipe during job - lost approx. bbls during job RU & 7" casing to 3500 for 30 mins. - pressure bleed down to 3270 . (fIPHILLIPS Alaska, Inc. ~. A SUbSidiary of PHILLIPS PETROLEUM COMPANY . WELL HISTORY HANDOVER FORM Well Name API# PTD# AFE Number CD2-18 103-20466-00 203-151 10030338 Producer Injector x New Well Workover Sidetrack x To Production To Drilling Completion Date x 09/24103 DIRECTIONAL INFORMATION Original RKB 36 KOP 300 DOWNHOLE INFORMATION Drillers TO 18018 PBTD !Top of fill or Junk NA Date Tagged Max angle of Hole Angle @ TO 96 @ 17978' 96.0 SITP 650 WELL INFORMATION lAP o OAP 20 BHP I Depth I Date Ilnsl. DOWNHOLE PLUGS (X or comment) X Description Weight (ppg) 6.80 9.20 6"80 Top (MD) 33 2645 33 Bottom (MD) 2645 11329 11329 BPV Installed 2 Way Check Downhole Plug IA VR Plug OA VR Plug Other Other RHC in XN Casing fluid Diesel Brine diesel Tubing fluid 3 CASING I TUBING DATA Size Top Bottom Conductor 16" 0 109 Surface 9.625 36 3221 Production 7.000 34 12112 Liner Tubing 4.500 32 11329 Tubing WI. 62.50 36.00 26.00 Grade H-40 J-55 L-80 Connection Welded BTC BTCM Coated? (X) Remarks 12.60 L-80 IBTM PERFORATION INFORMATION IAII Active Intervals) Top Bottom SPF Gun Type I Char¡¡e I Orientation Open Hole Completion Date KNOWN Communication (X for known comm) Tbg X IAI IAXOA Other Note: All boxes checked require additional comments below COMPLETION INFORMATION (Use default or pick list) Depth (Top) Item Manufacturer Type I Model Valve Size Latch Length 0.0. 1.0. 34 Tubing Pup FMC 4-1/2" IBT 2.19 4.600 3.968 2636 LAND NIPPLE Cameo DB-6 1.56 5.620 3.812 11121 GLM#1 Cameo KBG-2 1" Dummy BK 7.35 5.984 3.983 11235 PACKER Baker SAB-3 10.98 5.970 3.875 11317 NIPPLE Halliburton "XN" 124 5.000 3.725 11329 WLEG 1.36 5.000 3.875 EQUIPMENT DETAIL Tree FMC 4 1/16 5K (Manufacturer I Modell Type I Pressure Rating) Tree Cap Connection 7" Otis Tubing Hanger Connection 4.51BT Packoff Assembly Tubing Production Casing Surface Casin¡¡ New (X) X X X Replaced (X) Test Pressure 3500 3500 2500 Mechanical Integrity Tubing Prod Annulus Surf Annulus Test Pressure 3500 3500 Pass? (Y/N) Y Y State Witness (X) Comments Arctic Pack (Y/N) I no I Cmnt Shoe (YIN) I no GENERAL COMMENTS RHC profile plus ball/rod installed in XN nipple· rod has 1 3/8" FN and is fitted wi roller sub _ top roller is removed Mill outentension installed below packer' see attached schematic String Weight: UWT-185K, DWT.125K 9 518" X 7" annulus is freeze protected with diesel to 2660' Lost 264 bbls 8.8 ppg FloPro while circulating -left 108 bbls FloPro in hole f/16,166' to 18,808' Rig Name Doyon 19 Drilling Representative Don Mickey I David Burley Title Drillinç¡ Supv. Date 9/xx/2003 Wells Group Representative Title Date (For handover from Drilling only) Production I Operations Representative Revised 03/29/02 Title Date Signatures Required Return completed form to Wells Aide · e ¿)03--16l WELL LOG TRANSMITTAL To: State of Alaska Alaska Oil and Gas Conservation Comm. Attn.: Howard Okland 333 West 7th Avenue, Suite 100 Anchorage, Alaska 99501-3539 October 06, 2003 RE: MWD Formation Evaluation Logs - CD2-18, AK-MW-2649344 The technical data listed below is being submitted herewith. Please acknowledge receipt by returning a signed copy of this transmittal letter to the attention of: Rob Kalish, Sperry-Sun Drilling Services, 6900 Arctic Blvd., Anchorage, AK 99518 .~ éS :\ '>-\.\I~~ "C ~ ~ -"./v,- 1 LDWG formatted Disc with verification listing. ì /!)9 Q3 API#: 50-103-20466-00. ~~';Dr'{\(> " ~~ . ff\\ ~ ¡ ß \ LTU . (ill !Æ~j FRANK H. MURKOWSKI, GOVERNOR AI,ASIiA. OIL AND GAS CONSERVATION COMMISSION Chip Alvord Alpine Drilling Leader Leader ConocoPhillips (Alaska), Inc. PO Box 100360 Anchorage, AK 99510 333 W. 7'" AVENUE, SUITE 100 ANCHORAGE, ALASKA 99501-3539 PHONE (907) 279-1433 FAJ< (907)276-7542 Re: Colville River Field CD2-l8 (Revised) ConocoPhillips (Alaska), Inc. Permit No: 203-151 Surface Location: 1746' FNL, 1542' FEL, Sec. 2, T1IN, R4E, UM Bottomhole Location: 1915' FNL, 2024' FEL, Sec. 33, TI2N, R4E, UM Dear Mr. Alvord: Enclosed is the approved application for permit to drill the above referenced development well. This permit to drill does not exempt you from obtaining additional permits or approvals required by law from other governmental agencies, and does not authorize conducting drilling operations until all other required permits and approvals have been issued. In addition, the Commission reserves the right to withdraw the permit in the event it was erroneously issued. A spacing exception will be required if the TD of the well violates the 500 foot set-back requirement of CO 443, Rule 3. Operations must be conducted in accordance with AS 31.05 and Title 20, Chapter 25 of the Alaska Administrative Code unless the Commission specifically authorizes a variance. Failure to comply with an applicable provision of AS 31.05, Title 20, Chapter 25 of the Alaska Administrative Code, or a Commission order, or the terms and conditions of this permit may result in the revocation or suspension of the permit. Please provide at least twenty-four (24) hours notice for a representative of the Commission to witness any required test. Contact the Commission's North Slope petroleum field inspector at 659-3607 (pager). BY ORDER OF THE COMMISSION DATED this4 day of September, 2003 cc: Department ofFish & Game, Habitat Section wlo encl. Department of Environmental Conservation wlo encl. Exploration, Production and Refineries Section 1 a. Type of Work: Drill 0 Re-entry 0 2. Operator Name: ConocoPhillips Alaska, Inc. 3. Address: e e STATE OF ALASKA ALASKA OIL & GAS COMMISSION PERMIT TO DRILL RedrillU 1b. Current Well Class: Stratigraphic Test 0 P.O. Box 100360 Anchorage, AK 99510-0360 4a. Location of Well (Governmental Section): Surface: 1746' FNL, 1542' FEL, Sec. 2, T11N, R4E, UM . Top of Productive Horizon: 1000' FNL, 385' FWL, Sec. 3, T11N, R4E, UM · Total qepth: ¿SSI ( VJGÄ- ~'FNL,2 ê4' FEL, Sec. 33, T12N, R4E, UM 4b. Location of Well (State Base Plane Coordinates): r; ¿~f/.- Surface: x- ~'1 y- -~,161Ž" 16. Deviated wells: Kickoff depth: 300 18. Casing Program Size Hole 42" 12.25" 8.5" Casing 16" 9.625" 7" N/A 4.5" 19 Total Depth MD (It): Casing Structural Conductor Detailed Operations Intermediate Production Liner Perforation Depth MD (ft): 20. Attachments: Filing Fee Property Plat \J..JGIr Zone- 4 ft. Maximum Hole Angle: 91° Specifications Weight Grade Coupling Length 62.5# H-40 Weld 77' 36# J-55 BTC 3008' 26# L-80 BTC-M 11924' 12"6# L-80 IBT-mod 11280' PRESENT WELL CONDITION SUMMARY Total Depth TVD (It): Plugs (measured) Length Size 0" ExploratoryU Development Oil U¡;" .~Itiple Zone 0 Service 0 Development Gas 0 Single Zone 0 5. Bond: ~ Blanket U Single Well 11. Well Name and Number: Bond No. 59-52-180 CD2-18 .-/ 6. Proposed Depth: 12. Field/Pool(s): MD: 18623' ./ TVD: 7252' ¡/ Colville River Field 7. Property Designation: (Height above GL): 52 feet 17. Anticipated Pressure (see 20 MC 25.035) . Max. Downhole Pressure: 3281 psig / Max. Surface Pressure: 2556 psig Setting Depth Quantity of Cement Bottom c" f. or sacks TVD (including stage data) 114' 2390' 573 sx AS Lite & 230 sx LiteCrete 7262' 175 sx Class G 7095' ALK 380075, 387207, ASRCNPRA02 8. Land Use Permit: ADL N/A 9. Acres in Property: 2560 10. KB Elevation Top MD 37' 37' 37' 32' TVD 37' MD 114' 3045' 11961 ' 11312' (To be completed for Redrill and Re-Entry Operations) Effective Depth MD (ft): Effective Depth TVD (It): Junk (measured) Cement Volume MD TVD 37' 37' 32' I Perforation Depth TVD (ft): Drilling ProgramU Time v. Depth Plot U Seabed Report 0 Drilling Fluid Program 0 Date: o o BOP SketchU Diverter Sketch 0 21. Verbal Approval: Commission Representative: 22. I hereby certify that the foregoing is true and correct to the best of my knowledge. Printed Name C. Alvord Signature A L. ()t.(. I Alpine River Pool 13. Approximate ~te: ~~03 14. Distance to Nearest Property. 152' FNL, Sec. 33 T1 15. Distance to Nearest . Well within Pool: CD2-30, 714' Shallow Hazard Analysis U 20 AAC 25.050 requirements 0 Contact Vern Johnson 265-6081 Title Alpine Drilling Team Leader Phone 2 (, <) - G ¡LO Date 1 ( 11 ( 03 Preoared bv Vem Johnson Commission Use Only Permit to Drill . II API Number: I Permit APprOV~1 i l ~ Number: :2-0"3 - /5 I 50- /D 3 - 2D ~ ?-ÔÔ Date: OJ lj /J -/' Conditions of approval: Samples required 0 Ves ~ No Mud log req red Hydrogen sulfide measures 0 Ves i:RJ' No Directional survey required Other:A1 [ <? f'~ ~ ~l fU >\M- t- &té {Mi"-li,,,-<> Y f~ . Original Signed By Sarah Palin BY ORDER OF COMMISSIONER THE COMMISSION Approved by: Form 10-401 Revised 3/2003, Submit in Duplicate ORIGINAL Isee cover letter for other requirements o Ves ~ No BVes 0 No Dam c,/Jq/a ~ SITE DETAILS FIELD DETAILS Alpine CD2 Site Centre Northing: 5974641"66 Easting: 371696,24 Water Depth: 0.00 Positional Uncertainty: 0.00 Convergence: -0.980 ColviUe River Unit North Slope Alaska United States Geodetic System: US State Plane Coordinate System 1927 Ellipsoid: NAD27 (Clarke 1866) Zone: Alaska, Zone 4 Magnetic Model: BGGM2002 System Datum: Mean Sea L;,vel Local North: True North Name 10000- CD2-18 -29.45 :s ¡¡ g ~ + ~ ~ t q¡ +N/-S WELLDETAlLS +E/-W 3,64 Longitude Slot Northing 5974612.15 Easting Latitude 371699.38 70020'19.935N 151"02'27.976W N/A , , , , , I , , , , , , , , , I , , , , , , , , , I , , , , , , , , , , , , , , , , "000 ..000 "zooo WestH/El\sH+) [2000ftliui SECTION DETAILS Sec MD Inc Azi TVD +N/-S +E/· W DLeg TFace VSee Target 1 12541.13 90.990 328.110 7281.87 1483.83 -9104"62 0.00 0"000 5603"71 2 12637.83 90.409 331"934 7280.69 1567"57 -9152"93 4ÆO 98.614 5700.33 3 16652"37 90.409 33U34 7252.04 5109.95 -1I04L65 0.00 0.000 9714.77 4 16662.64 90"000 331.896 7252.00 5119.01 ·1104M8 4.00 ·174.620 9725.04 CD2-18 (Toe) 5 18662"75 90"000 331.896 7252.00 6883.29 -11988"68 0.00 0.000 11725.14 CD2·18 Toe Extension I I Company: Field: Site: , Well: Wellpath: ConocoPhillips Alaska Inc. Colville River Unit Alpine CD2 CD2-18 Rig: CD2-18 Field: Colville River Unit North Slope Alaska United States Map System: US State Plane Coordinate System 1927 Geo Datum: NAD27 (Clarke 1866) Sys Datum: Mean Sea Level Site: Alpine CD2 e e SPERRY SUN Planning Report Date: 9/18/2003 Time: 15:30:57 Co-ordinate(NE) Reference: Well:CD2-18, True North Vertical (TVD)ReférellCe: 52' MSL52.0 Section (VS) Reference: Well (0.OON,O.OOE,331.85AZi) Plan: CD2-18 (wp05) Map Zone: Coordinate System: Geomagnetic Model: Alaska, Zone 4 Well Centre BGGM2oo2 Site Position: NortIúng: 5974641.66 ft Latitude: 70 20 20.225 N From: Map Easting: 371696.24 ft Longitude: 151 2 28.083 W Position Uncertainty: 0.00 ft North Reference: True Ground Level: 0"00 ft Grid Convergence: -0.98 deg Well: CD2-18 Slot Name: Surface Position: +N/-S -29.45 ft Northing: 5974612.15 ft Latitude: 70 20 19.935 N +EI-W 3.64 ft Easting : 371699.38 ft Longitude: 151 2 27.976 W Position Uncertainty: 0.00 ft Reference Point: +N/-S -29.45 ft Northing: 5974612.15 ft Latitude: 70 20 19"935 N +EI-W 3.64 ft Easting : 371699.38 ft Longitude: 151 2 27"976 W Measured Depth: 36.10 ft Inclination: 0.000 deg Vertical Depth: 36"10 ft Azimuth : 0.000 deg Wellpath: Rig: CD2-18 Current Datum: Magnetic Data: Field Strength: Vertical Section: 52' MSL 9/8/2003 57434 nT Depth From (TVD) ft 36.10 Plan: CD2-18 (wp05) Principal: Yes Plan Section Information MD Incl Azim TVD ft deg deg ft 12541.13 90.990 328.110 7281.87 12637.83 90.409 331.934 7280.69 16652.37 90.409 331.934 7252.04 16662.64 90.000 331.896 7252.00 18662.75 90.000 331.896 7252.00 Section 1 : Start DLS 4.00 TFO 98.61 Incl Azim TVD deg deg ft 90.990 328.110 7281.87 90.637 330.438 7281.03 90.409 331 "934 7280.69 MD ft 12541.13 12600.00 12637.83 Section 2 : Start Hold MD Incl Azim TVD ft deg deg ft 12700"00 90.409 331.934 7280.24 12800.00 90.409 331.934 7279.53 12900.00 90.409 331.934 7278.82 13000.00 90.409 331.934 7278.10 13100.00 90.409 331.934 7277 .39 13200.00 90.409 331.934 7276.67 13300.00 90.409 331.934 7275.96 Height 52.00 ft +N/-S ft 0.00 +N/-S ft 1483"83 1567.57 5109.95 5119.01 6883.29 +EI-W ft -9104.62 -9152.93 -11041 "65 -11046.48 -11988.68 Drilled From: Tie-on Depth: Above System Datum: Declination: Mag Dip Angle: +EI-W ft 0"00 Well Ref. Point 36" 10 ft Mean Sea Level 24.49 deg 80.59 deg Direction deg 331.850 9/18/2003 2 From: CD2-18 ST (Rig Surveys) Date Composed: Version: Tied-to: DLS Build Turn deg/1ooft deg/100ft deg/1001t 0.00 0.00 0.00 4.00 -0.60 3.95 0.00 0.00 0.00 4.00 -3.98 -0.38 0.00 0.00 0.00 TFO deg 0"00 98.61 0.00 -174.62 0.00 Targl!t CD2-18 (Toe) CD2-18 Toe Extension +N/-S +EI-W VS DLS Build Turn TFO ft ft ft deg/10OO deg/1 000 deg/1001t deg 1483"83 -9104.62 5603.71 0.00 0.00 0.00 0.00 1534.43 -9134.69 5662.51 4.00 -0.60 3.96 98.61 1567.57 -9152.93 5700.33 4.00 -0.60 3.95 98.65 +N/-S +EI-W VS DLS Build Turn TFO ft ft ft deg/10OO deg/100ft deg/1001t deg 1622.43 -9182J 7 5762.50 0.00 0.00 0.00 0.00 1710.67 -9229.22 5862.50 0.00 0.00 0.00 0.00 1798.91 -9276.27 5962.50 0.00 0.00 0.00 0.00 1887.15 -9323.32 6062.49 0.00 0.00 0"00 0.00 1975.39 -9370.36 6162.49 0.00 0.00 0.00 0"00 2063.62 -9417.41 6262.49 0.00 0.00 0"00 0.00 2151.86 -9464.46 6362.49 0.00 0.00 0.00 0.00 ORIGINAL Company: Field: Site: Well: Wellpath: Section ConocoPhillips Alaska Inc. Colville River Unit Alpine CD2 CD2-18 Rig: CD2-18 2 : Start Hold MD ft 13400.00 13500.00 13600.00 13700"00 13800.00 13900.00 14000.00 14100.00 14200.00 14300.00 14400.00 14500.00 14600.00 14700.00 14800.00 14900.00 15000.00 15100.00 15200.00 15300.00 15400.00 15500.00 15600.00 15700.00 15800.00 15900.00 16000.00 16100.00 16200.00 16300.00 16400.00 16500.00 16600.00 16652.37 Incl deg 90.409 90.409 90.409 90.409 90.409 90.409 90.409 90.409 90.409 90.409 90.409 90.409 90.409 90.409 90.409 90.409 90.409 90.409 90.409 90.409 90.409 90.409 90.409 90.409 90.409 90.409 90.409 90.409 90.409 90.409 90.409 90.409 90.409 90.409 Azim deg 331.934 331 "934 331.934 331.934 331.934 331.934 331.934 331.934 331.934 331.934 331.934 331.934 331.934 331.934 331.934 331.934 331.934 331.934 331.934 331.934 331.934 331.934 331.934 331.934 331.934 331.934 331.934 331.934 331.934 331.934 331.934 331.934 331.934 331.934 TVD ft 7275.25 7274.53 7273.82 7273.11 7272.39 7271.68 7270.97 7270.25 7269.54 7268.82 7268.11 7267.40 7266.68 7265"97 7265.26 7264.54 7263.83 7263.12 7262.40 7261 .69 7260.97 7260.26 7259.55 7258.83 7258.12 7257.41 7256.69 7255.98 7255.26 7254.55 7253.84 7253.12 7252.41 7252"04 MD ft 16662.64 3 : Start DLS 4.00 TFO -174"62 Incl Azim TVD deg deg ft 90.000 331.896 7252.00 Section Section 4: Start Hold MD ft 16700.00 16800.00 16900.00 17000.00 17100.00 17200"00 17300.00 17400.00 17500.00 17600.00 17700.00 17800.00 17900.00 18000.00 18100.00 18200.00 18300.00 18400.00 18500.00 Incl deg 90.000 90.000 90.000 90.000 90"000 90.000 90.000 90.000 90.000 90.000 90.000 90.000 90.000 90.000 90.000 90.000 90.000 90.000 90.000 Azim deg 331.896 331.896 331.896 331.896 331.896 331.896 331.896 331.896 331.896 331.896 331.896 331.896 331.896 331 "896 331.896 331.896 331.896 331.896 331.896 TVD ft 7252.00 7252.00 7252.00 7252.00 7252.00 7252.00 7252.00 7252.00 7252.00 7252.00 7252.00 7252.00 7252.00 7252.00 7252.00 7252.00 7252.00 7252.00 7252.00 e SPERRY SUN Planning Report +N/·S ft 2240.10 2328.34 2416.58 2504.82 2593.06 2681.29 2769"53 2857.77 2946.01 3034.25 3122.49 3210.73 3298.97 3387.20 3475.44 3563.68 3651.92 3740J6 3828.40 3916.64 4004.88 4093.11 4181.35 4269.59 4357.83 4446.07 4534.31 4622.55 4710.78 4799"02 4887.26 4975.50 5063.74 5109.95 e Date: 9/18/2003 Time: 15:30:57 Co·ordinate(NE) Reference: Well: CD2-18,TrueNorth Vertical (TVD) ReferellCe: 52' MSL 52.0 Section (VS) Reference: Well (0.00N,0.OOE.331.85Azj) Plan: CD2-18 (wp05) +FJ·W ft -9511.50 -9558.55 -9605.60 -9652.65 -9699.69 -9746.74 -9793.79 -9840.83 -9887.88 -9934.93 -9981.97 -10029.02 -10076.07 -10123.12 -10170.16 -10217.21 -10264.26 -10311.30 -10358"35 -10405.40 -10452.45 -10499.49 -10546.54 -10593.59 -10640.63 -10687.68 -10734.73 -10781.77 -10828.82 -10875.87 -10922.92 -10969.96 -11017.01 -11041.65 +NI-S +FJ·W ft ft 5119.01 -11046.48 +N/·S ft 5151.97 5240.17 5328.38 5416.59 5504.80 5593m 5681.22 5769.43 5857.64 5945.85 6034.06 6122.27 6210.48 6298.69 6386.90 6475.10 6563.31 6651.52 6739.73 +FJ-W ft -11064.08 -11111.19 -11158.30 -11205.41 -11252.51 -11299.62 -11346.73 -11393.84 -11440.94 -11488.05 -11535.16 -11582.27 -11629.37 -11676.48 -11723.59 -11770.70 -11817.80 -11864.91 -11912"02 VS ft 6462.48 6562.48 6662.48 6762.48 6862.47 6962.47 7062.47 7162.47 7262.46 7362.46 7462.46 7562.45 7662.45 7762.45 7862.45 7962.44 8062.44 8162.44 8262.44 8362.43 8462.43 8562.43 8662.43 8762.42 8862.42 8962.42 9062.42 9162.41 9262.41 9362.41 9462.40 9562.40 9662.40 9714.77 VS ft 9725.04 VS ft 9762.40 9862.40 9962.40 10062.40 10162.40 10262.40 10362.40 10462.40 10562.40 10662.40 10762.40 10862.40 10962.40 11062.40 11162.40 11262.40 11362.40 11462.40 11562.40 DLS Build Turn deg/10Oft degl100ft dag/l00ft 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0"00 0.00 0"00 0.00 0.00 0"00 0.00 0.00 0.00 0"00 0.00 0"00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0"00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 DLS Build Turn degl100ft deg/10Oft degl100ft 4.00 -3.98 -0.38 DLS Build Turn degl100ft deg/10Oft deg/10Oft 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0"00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 ORIGINAL 0.00 0"00 0.00 0.00 0.00 0.00 0"00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 TOO deg 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0"00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0"00 0.00 0.00 0.00 0.00 TOO deg -174.62 TFO dag 0.00 0.00 0.00 0"00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0"00 0.00 0.00 0.00 0.00 0.00 0.00 e Company: ConocoPhillips Alaska Inc" Field: Colville River Unit Site: Alpine CD2 Well: CD2-18 Wellpatb: Rig: CD2-18 Section 4: Start Hold MD Incl ft deg 18600.00 90.000 18662.70 90.000 18662.75 90.000 Targets Azim deg 331.896 331 "896 331.896 TVD ft 7252"00 7252.00 7252.00 Name Description TVD Dip. Dir. ft CD2-18 (7" Csg) 7233.00 CD2-18 (Rev Heel) -Polygon 1 -Polygon 2 -Polygon 3 -Polygon 4 CD2-18 (Toe) CD2-18 Toe Extension Annotation MD ft 18662.70 16662.64 TVD ft 7252.00 7252.00 7242.00 7242.00 7242.00 7242.00 7242.00 7252.00 7252.00 SPERRY SUN Planning Report e Date: 9/18/2003 Time: 15:30:57 Page: Co-ordinate(NE) Reference: Well: CD2-18, True North Vertical (TVD) Reference: 52' MSL 52.0 Section (VS) Reference: Well (0.00N.0.ooE.331.85AzJ) Plan: CD2-18 (wp05) +N/·S +FJ-W VS DLS Build Turn TFO ft ft ft deg/100ft deg/10Oft deg/10Oft deg 6827.94 -11959.13 11662.40 0.00 0.00 0.00 0.00 6883.25 -11988.66 11725.10 0.00 0.00 0.00 0.00 6883.29 -11988.68 11725.14 0.00 0.00 0.00 0.00 Map Map <--.- Latitude .-..> <:·_·~ongitu~c;,;..:> +N/-S +FJ·W Northing Easting Deg Min Sec Deg MiriSeC ft ft ft ft 981.73 -8823.18 5975744.61 362895.01 70 20 29.539 N 151 6 45.720 W 1150.40 -8925.10 5975915.00 362796.00 70 20 31.197 N 151 6 48.703 W 1010.49 -8976.71 5975776.00 362742.00 70 20 29.821 N 151 6 50.206 W 1113.90 -8778.44 5975876.00 362942.00 70 20 30.840 N 151 6 44.417 W 5170.72 -10947.34 5979969.00 360843.00 70 21 10.710 N 151 7 47.950 W 5067.30 -11145.62 5979869.00 360643.00 70 21 9"690 N 151 7 53.740 W 5119.01 -11046.48 5979918.99 360743.00 70 21 10"200 N 151 7 50.845 W 6883"29 -11988.68 5981698"99 359831.20 70 21 27.537 N 151 8 18.466 W 152'FNL, 2964'FEL; See 33-T12N-R4E 2796'FNL 1553' FEL; See33-T12N-R4E ORIGINAL e SPERRY SUN e GeoReport Company: ConocoPhillips Alaska Inc. Date: 9/18/2003 Tlnîe: 15:31:57 Page: 1 Field: Colville River Unit Co-ordinate(NE) Reference: Well: CÐ2-18,TrueNörß1 Site: Alpine CD2 Vertical (TVD) RefêreiIce: 52' MSL 52;0 Well: CD2-18 Section (VS) Reference: Well.(0.OON,0.00E,331.85AzO Wellpath: Rig: CD2-18 Survey Calculation Method: MinimumCurvature Db: Orâcl.e Survey: Start Date: Company: Engineer: Tool: Tied-to: Survey MD Incl Azim TVD Sys TVD N/S EIW MapN MapE ft deg deg ft ft ft ft ft ft 12541.13 90.990 328.110 7281.87 7229"87 1483.83 -9104"62 5976251.42 362622.22 12600.00 90.637 330.438 7281.03 7229.03 1534.43 -9134.69 5976302.52 362593.02 12637.83 90.409 331.934 7280.69 7228.69 1567.57 -9152"93 5976335.97 362575.36 12700.00 90.409 331.934 7280.24 7228.24 1622.43 -9182.17 5976391.31 362547.06 12800.00 90.409 331.934 7279.53 7227.53 1710.67 -9229.22 5976480.34 362501.53 12900.00 90.409 331.934 7278.82 7226.82 1798.91 -9276.27 5976569.36 362456.00 13000.00 90.409 331.934 7278.10 7226.10 1887.15 -9323.32 5976658.39 362410.48 13100.00 90.409 331.934 7277.39 7225.39 1975.39 -9370.36 5976747.41 362364.95 13200.00 90.409 331.934 7276.67 7224.67 2063.62 -9417.41 5976836.43 362319.42 13300.00 90.409 331.934 7275.96 7223.96 2151.86 -9464.46 5976925.46 362273.90 13400.00 90.409 331.934 7275.25 7223.25 2240.10 -9511.50 5977014.48 362228.37 13500.00 90.409 331.934 7274.53 7222.53 2328.34 -9558.55 5977103.50 362182.84 13600.00 90.409 331.934 7273.82 7221.82 2416.58 -9605.60 5977192.53 362137.32 13700.00 90.409 331.934 7273.11 7221.11 2504.82 -9652.65 5977281.55 362091.79 13800.00 90.409 331.934 7272.39 7220.39 2593.06 -9699"69 5977370.57 362046.26 13900.00 90.409 331.934 7271.68 7219.68 2681.29 -9746.74 5977459.60 362000.74 14000.00 90.409 331.934 7270.97 7218.97 2769.53 -9793.79 5977548.62 361955.21 14100.00 90.409 331.934 7270.25 7218.25 2857"77 -9840.83 5977637.64 361909.68 14200.00 90.409 331 "934 7269.54 7217"54 2946.01 -9887.88 5977726.67 361864.16 14300"00 90.409 331.934 7268.82 7216.82 3034.25 -9934.93 5977815.69 361818"63 14400.00 90.409 331 "934 7268.11 7216.11 3122.49 -9981.97 5977904.72 361773.10 14500"00 90.409 331.934 7267.40 7215.40 3210.73 -10029.02 5977993.74 361727.58 14600.00 90.409 331.934 7266.68 7214.68 3298.97 -10076.07 5978082.76 361682.05 14700.00 90.409 331.934 7265.97 7213.97 3387.20 -10123.12 5978171.79 361636.52 14800.00 90.409 331.934 7265.26 7213.26 3475.44 -10170"16 5978260.81 361591.00 14900.00 90.409 331.934 7264.54 7212.54 3563.68 -10217.21 5978349.83 361545.47 15000.00 90.409 331.934 7263.83 7211.83 3651.92 -10264.26 5978438.86 361499.94 15100.00 90.409 331.934 7263.12 7211.12 3740.16 -10311.30 5978527.88 361454.42 15200.00 90.409 331.934 7262.40 7210.40 3828.40 -10358.35 5978616.90 361408"89 15300.00 90.409 331.934 7261.69 7209.69 3916.64 -10405.40 5978705.93 361363.36 15400.00 90.409 331.934 7260.97 720R97 4004.88 -10452.45 5978794.95 361317.84 15500.00 90.409 331.934 7260.26 7208.26 4093.11 -10499.49 5978883.97 361272.31 15600.00 90.409 331.934 7259.55 7207.55 4181.35 -10546.54 5978973.00 361226.78 15700.00 90.409 331 "934 7258.83 7206.83 4269.59 -10593.59 5979062.02 361181.26 15800.00 90.409 331.934 7258"12 7206.12 4357.83 -10640.63 5979151.04 361135.73 15900.00 90.409 331.934 7257.41 7205.41 4446.07 -10687.68 5979240.07 361090.20 16000.00 90.409 331.934 7256.69 7204.69 4534.31 -10734.73 5979329.09 361044.68 16100.00 90.409 331.934 7255.98 7203.98 4622.55 -10781.77 5979418.12 360999.15 16200.00 90.409 331.934 7255.26 7203.26 4710.78 -10828.82 5979507.14 360953.62 16300.00 90.409 331.934 7254.55 7202.55 4799.02 -10875.87 5979596.16 360908.10 16400.00 90.409 331.934 7253.84 7201.84 4887.26 -10922.92 5979685.19 360862.57 16500.00 90.409 331.934 7253.12 7201.12 4975.50 -10969.96 5979774.21 360817.04 16600.00 90.409 331.934 7252.41 7200.41 5063.74 -11017.01 5979883.23 360771 "52 16652.37 90.409 331.934 7252.04 7200.04 5109.95 -11041.65 5979909.86 360747.68 16862.64 90.000 331.896 7252.00 7200.00 5119.01 -11046.48 5979918.99 360743"00 16700.00 90.000 331.896 7252.00 7200.00 5151.97 -11064.08 5979952.24 360725.97 16800.00 90.000 331.896 7252.00 7200.00 5240.17 -1111U9 5980041 .24 360680.38 16900.00 90.000 331 "896 7252.00 7200.00 5328.38 -11158.30 5980130.24 360634.79 17000.00 90.000 331.896 7252.00 7200.00 5416.59 -11205.41 5980219.23 360589.20 17100.00 90.000 331.896 7252.00 7200.00 5504.80 -11252.51 5980308.23 360543.61 ORIGINAL ConocoPhillips Alaska Inc" Colville River Unit Alpine CD2 CD2-18 Rig: CD2-18 Company: Field: Site: Well: WelIpath: Survey MD ft 17200.00 17300.00 17400.00 17500.00 17600.00 17700.00 17800.00 17900.00 18000.00 18100.00 --y 18200.00 18300.00 18400.00 18500.00 18600.00 v 18662.76 Inel deg 90.000 90.000 90.000 90.000 90.000 90.000 90.000 90.000 90.000 90.000 90.000 90.000 90.000 90.000 90.000 90.000 Wellpath: Rig: CD2-18 Current Datum: Magnetic Data: Field Strength: Vertical Section: Targets ADm deg 331.896 331.896 331.896 331.896 331.896 331.896 331.896 331.896 331.896 331.896 331.896 331.896 331.896 331.896 331.896 331.896 52' MSL 9/8/2003 57434 nT Depth From (TVD) ft 36.10 e SPERRY SUN e GeoReport Date: 9/18/2003 Time: 15:31 :57 Påge: Co-ordinate(NE) Reference: Well: CD2-18. True North Vertical (TVD) Reference: 52' MSL 52.0 Sedilln (VS) Refercnœ: Well (O.00N,0.00E.331.85Azi) SlIn"cy Calcllhttion Mcthod: Minimum Curvature Db: Oracle , ..----.- ._. ...._....___.___._...._____.__J TVD Sys TVD N/S E/W MapN MapE ft ft ft ft ft ft 7252.00 7200.00 5593.01 -11299.62 5980397.22 360498.03 7252.00 7200.00 5681.22 -11346.73 5980486.22 360452.44 7252.00 7200.00 5769.43 -11393.84 5980575.21 360406.85 7252.00 7200"00 5857.64 -11440.94 5980664.21 360361.26 7252.00 7200"00 5945.85 -11488.05 5980753.20 360315.68 7252.00 7200.00 6034.06 -11535.16 5980842.20 360270.09 7252.00 7200.00 6122.27 -11582.27 5980931.19 360224.50 7252"00 7200.00 6210.48 -11629.37 5981020.19 360178.91 7252.00 7200.00 6298.69 -11676.48 5981109.18 360133.33 7252.00 7200.00 6386.90 -11723.59 5981198.18 360087.74 7252.00 7200.00 6475.10 -11770.70 5981287.17 360042.15 7252.00 7200.00 6563.31 -11817.80 5981376.17 359996.56 7252.00 7200.00 6651.52 -11864.91 5981465.16 359950.98 7252.00 7200.00 6739.73 -11912.02 5981554.16 359905.39 7252.00 7200"00 6827.94 -11959.13 5981643.15 359859.80 7252.00 ,/ 7200.00 6883.28 -11988.66 5981698.98 359831.2ra Height 52.00 ft Drilled From: Tie-on Depth: Above System Datum: Declination: Mag Dip Angle: +EI-W ft 0.00 Well Ref. Point 36.10 ft Mean Sea Level 24.49 deg 80"59 deg Direction deg 331.850 +N/-S ft 0.00 7242"00 7242.00 7242.00 7242.00 7242.00 Map Map <---- Latitude· ----> <···Longitqd~ ...;> +N/·S +EI·W Northing Easting Deg Min See Deg MiJ1. . See ft ft ft ft 981.73 -8823.18 5975744.61 362895"01 70 20 29.539 N 151 6 45.720 W 1150.40 -8925.10 5975915.00 362796"00 70 20 31.197 N 151 6 48.703 W 1010.49 -8976.71 5975776.00 362742.00 70 20 29.821 N 151 6 50.206 W 1113.90 -8778.44 5975876.00 362942"00 70 20 30.840 N 151 6 44.417 W 5170.72 -10947.34 5979969.00 360843"00 70 21 10.710 N 151 7 47.950 W 5067.30 -11145.62 5979869.00 360643.00 70 21 9.690 N 151 7 53.740 W 5119.01 -11 046.48 5979918.99 360743.00 70 21 10.200 N 151 7 50.845 W 6883.29 -11988.68 5981698.99 359831.20 70 21 27.537 N 151 8 18"466 W Name Description TVD Dip. Dir. ft CD2-18 (7" Csg) 7233.00 CD2-18 (Rev Heel) -Polygon 1 -Polygon 2 ·Polygon 3 -Polygon 4 CD2-18 (Toe) CD2-18 Toe Extension Annotation MD ft 18662.70 16662.64 TVD ft 7252.00 7252.00 7252.00 7252.00 152'FNL, 2964'FEL; See 33-T12N-R4E 2796'FNL 1553' FEL; See33-T12N-R4E ORIGINAL e SPERRY SUN Anticollision Report Company: ConocoPhillips Alaska Inc. Field: Colville River Unit Reference Site: Alpine CD2 Reference WeD: CD2-18 Reference WeDpath: Rig: CD2-18 NO GLOBAL SCAN: Using user defined selection & scan criteria Interpolation Method: MD Interval: 100.00 ft Depth Range: 12541.13 to 18662.98 ft Maximum Radius: 10000.00 ft Casing Points MD TVD Diameter Hole Size Nåtne ft ft in in 3189.00 2366.00 9.625 12.250 95/8" 12112.00 7270.30 7.000 8.500 7' 18662.00 7252.00 6.125 6.125 Open Hole Plan: CD2-18 (wp05) Principal: Yes Summary <---------------------- Offset Wellpath ----------------------> Site Well WeDpath Alpine CD1 Alpine CD1 Alpine CD1 Alpine CD1 Alpine CD1 Alpine CD1 Alpine CD1 Alpine CD1 Alpine CD1 Alpine CD1 Alpine CD1 Alpine CD1 Alpine CD1 Alpine CD1 Alpine CD1 Alpine CD1 Alpine CD1 Alpine CD1 Alpine CD1 Alpine CD1 Alpine CD1 Alpine CD1 Alpine CD1 Alpine CD1 Alpine CD1 Alpine CD1 Alpine CD1 Alpine CD1 Alpine CD1 Alpine CD1 Alpine CD1 Alpine CD1 Alpine CD1 Alpine CD1 Alpine CD1 Alpine CD1 Alpine CD1 Alpine CD1 Alpine CD1 Alpine CD1 Alpine CD1 Alpine CD1 Alpine CD1 Alpine CD1 Alpine CD1 Alpine CD1 CD1-01 CD1-01 CD1-02 CD1-03 CD1-04 CD1-05 CD1-05 CD1-06 CD1-06 CD1-09 CD1-09 CD 1-1 0 CD1-13 CD1-14 CD1-14 CD1-14 CD1-14 CD1-14 CD1-16 CD1-16 CD1-17 CD1-19 CD1-19 CD1-21 CD1-21 CD1-21 CD1-229 CD1-229 CD1-22 CD1-22 CD1-23 CD1-24 CD1-25 CD1-26 CD1-26 CD1-27 CD1-28 CD1-28 CD1-30 CD1-30 CD1-31 CD1-31 CD1-31 CD1-32 CD1-32 CD1-33 CD1-01 V1 CD1-01 PB1 V1 CD1-02 V2 CD1-03 V1 CD1-04 V1 CD1-05 V1 CD1-05PB1 V1 CD1-06 V1 CD1-06PB1 V1 CD1- 09PB1 V1 CD1-09 V2 CD1-10 V1 CD1-13 V1 CD1-14 GYRO VO CD1-14 MWD VO CD1-14 PB1 MWD V1 CD1-14 PB1 V1 CD1-14 V1 CD1-16 V1 CD1-16PB1 V1 CD1-17 V2 CD1-19 V2 CD1-19A V4 CD1-21 V1 CD1-21 L 1 V1 CD1-21PB1 V1 CD1-229 PB1 V1 CD1-229 V1 CD1-22 V6 CD1-22A V6 CD1-23 V3 CD1-24 V1 CD1-25 V1 CD1-26 V1 CD1-26PB1 V1 CD1-27 V1 CD1-28 PB1 V1 CD1-28 V1 CD1-30 PB1 V1 CD1-30 V1 CD1-31 CAZ V1 CD1-31I1FR V1 CD1-31 V6 CD1-32 PB1 V3 CD1-32 V1 CD1-33 V1 Date: 9/18/2003 Co-ordinate(NE) Reference: Vertical (TVD) Reference: Reference: Error Model: Scan Method: Error Surface: Date Composed: Version: Tied-to: Reference MD ft Offset MD ft ORIGINAL e Time: 15:03:13 1 Page: Well: CD2-18, TrueNörth 52' MSL 52.0 Db: Plan: CD2-18 (wp05) & NOT PLANNED P:¡JGR, ISCWSA Ellipse Trav Cylinder North Ellipse + Casing 9/18/2003 1 From: CD2-18 ST (Rig Surveys) Ctr-Ctr No-Go Distance Area ft ft Allowable Deviation ft Out of range Out of range Out of range Out of range Out of range Out of range Out of range Out of range Out of range Out of range Out of range Out of range Out of range Out of range Out of range Out of range Out of range Out of range Out of range Out of range Out of range Out of range Out of range Out of range Out of range Out of range Out of range Out of range Out of range Out of range Out of range Out of range Out of range Out of range Out of range Out of range Out of range Out of range Out of range Out of range Out of range Out of range Out of range Out of range Out of range Out of range ComPìU1Y: Field: Reference Site: Reference Well: Reference Wellpath: ConocoPhillips Alaska Inc. Colville River Unit Alpine CD2 CD2-18 Rig: CD2-18 e SPERRY SUN Anticollision Report e Date: 9/18/2003 Time: 15:03:13 Co-ordinate(NE) Reference: Well: CD2-tS, True North Vertical (TVD) Reference: 52' MSL 52.0 Summary <---------------------- Offset Wellpath ----------------------> Site Well Wellpath Alpine CD1 Alpine CD1 Alpine CD1 Alpine CD1 Alpine CD1 Alpine CD1 Alpine CD1 Alpine CD1 Alpine CD1 Alpine CD1 Alpine CD1 Alpine CD1 Alpine CD1 Alpine CD1 Alpine CD1 Alpine CD1 Alpine CD1 Alpine CD1 Alpine CD1 Alpine CD1 Alpine CD1 Alpine CD1 Alpine CD1 Alpine CD1 Alpine CD1 Alpine CD1 Alpine CD1 Alpine CD1 Alpine CD1 Alpine CD1 Alpine CD1 Alpine CD1 Alpine CD1 Alpine CD1 Alpine CD2 Alpine CD2 CD1-34 CD1-35 CD1-36 CD1-36 CD1-37 CD1-38 CD1-38 CD1-39 CD1-39 CDHO CD1-41 CD1-41 CD1-42 CD1-43 CD1-44 CD1-44 CD1-45 CD1-45 Plan: CD1-07 Plan: CD1-07 Prelim: CD1-08 Prelim: CD1-11 Prelim: CD1-12 Prelim: CD1-15 Prelim: CD1-18 Prelim: CD1-20 Prelim: CD1-46 Prelim: CD1-47 Prelim: CD1-48 Prelim: CD1-49 Prelim: CD1-50 Prelim: CD1-50 Prelim: CD1-50 Prelim: CD1-50 CD2-30 Plan: CD2-31 Reference MD ft Offset MD ft Ctr-Ctr No-Go Distance Area ft ft Allowable Deviation ft CD1-34 V1 CD1-35 V1 CD1-36 PB1 V1 CD1-36 V1 CD1-37 V1 CD1-38 PB1 V1 CD1-38 V1 CD1-39 PB1 V1 CD1-39 V1 CD1-40 V1 CD1-41 PB1 V1 CD1-41 V1 CD1-42 V1 CD1-43 V1 CD1-44 PB1 V1 CD1-44 V1 CD1-45 PB1 V1 CD1-45 V1 CD1-07 PB1 V1 Plan: CD CD1-07 VO Plan: CD1-07 CD1-08 V1 Plan: CD1-08 CD1-11 VO Plan: CD1-11 CD1-12 VO Plan: CD1-12 CD1-15 VO Plan: CD1-15 CD1-18 VO Plan: CD1-18 CD1-20 VO Plan: CD1-20 CD1-46 V1 Plan: CD1-46 CD1-47 VO Plan: CD1-47 CD1-48 VO Plan: CD1-48 CD1-49 VO Plan: CD1-49 CD1-50VO Plan: B-58 ( Prelim: B-49 VO Plan: Prelim: B-55 VO Plan: Prelim: B-58 VO Plan: Plan: CD2-30 V4 Plan: Plan: CD2-31 (ST Core) 15092.27 14200.00 1913.67 375.17 1538.50 ORIGINAL Page: Db: Oracle WarJÚng Out of range Out of range Out of range Out of range Out of range Out of range Out of range Out of range Out of range Out of range Out of range Out of range Out of range Out of range Out of range Out of range Out of range Out of range Out of range Out of range Out of range Out of range Out of range Out of range Out of range Out of range Out of range Out of range Out of range Out of range Out of range Out of range Out of range Out of range Out of range Pass: Major Risk ConocoPhillips Alaska, Inc. e Post Office Box 100360 Anchorage, Alaska 99510-0360 Telephone 907-276-1215 e ~ ConocoPhillips August29,2003 Alaska Oil and Gas Conservation Commission 333 West 7'h Avenue, Suite 100 Anchorage, Alaska 99501 "( 9 Re: Application for Permit to Drill CD2-18 (Extended horizontal) Dear Sir or Madam: ConocoPhillips Alaska, Inc. per 20 AAC 25.015(b)(1) - change of bottom hole location more than 500' laterally in approved Permit to Drill (203-151) submits the attached revised Permit to Drill along with the $100 fee. ~ - ; ./ ConocoPhillips plans to extend the horizontal length of the Alpine well CD2-18 (injector) up to an additional 2000' beyond the currently permitted depth. Length of the extension will depend on sand quality and thickness. All other pertinent well information remains the same. Attached is the revised directional plan, showing the 2000' extension. The CD2-08 is currently drilling 6-1/8" horizontal at 15050' MD. Estimated date to begin drilling past the originally permitted depth is September 20. .; If you have any questions or require further information, please contact Chip Alvord at 265-6120 or me at 265-6081 . ?relY, 7 t/·~ (-- Vern Johnson Drilling Engineer Attachments cc: CD2-18 Well File I Sharon Allsup Drake Chip Alvord Vern Johnson Cliff Crabtree Steve Moothart Nancy Lambert Lanston Chin e-mail: ATO 1530 A TO 868 A TO 802 A TO 848 A TO 844 Anadarko - Houston Kuukpik Corporation Tommy Thompson@anadarko.com - # I: 0 ~ ~ ~ 0 0 ~ L, L, I: 2 ~ 8 L, 'i' ~ '1 0 'i' '1 2 'i' b II- ~ 0 0 ~ ........ CHASE Chase Manhattan Bank USA. N.A. Valid Up To 5000 Dollars '-, 200 White Clay Cent~r Dr.. Newark. DE 19711 1003 C;~~¿1 f /¡C¡ VJO"3 . DATEr 7 ~p.¿y 1'( 62-14/311 :;~~~~6~E . 7Ynrs OF !f-LItSCÆ /ÆCéJCC 1$ /00.00 ~Oh.P_ !u~ ~(!hs ~~i/~/;¿:)O~ ~ =:::- SHARON K. ALLSUP-DRAKE CONOCOPHILLlPS 3760 PERENOSA ANCHORAGE AK 99515 e e e e TRANSMIT AL LETTER CHECKLIST CIRCLE APPROPRIATE LETTER/P ARA GRAPH S TO BE INCLUDED IN TRANSMITTAL LETTER WELL NAME é!.Rtt... (!2) 2- -/8 Þ;GIe-r¡ "Zrr~ PTD# 2-D?:; I ~ / CHECK WßA T APPLIES ADD-ONS (OPTIONS) MULTI LATERAL (If API number last two (2) digits are between 60-69) "CLUE" The permit is for a new well bore segment of existing well ~ Permit No, API No. Production should continue to be reported as a function· of the original API number stated above. HOLE In accordance with 20 AAC 25.005(1), all records, data and logs acquired for the pilot hole must be clearly differentiated in both name (name on permit plus PH) and API number (50 70/80) from records, data and logs acquired for well (name on permit). Pn.,OT (PH) SPACING EXCEPTION DRY DITCH SAMPLE The permit is approved subject to full compliance with 20 AAC 25.055. Approval to perforate and produce is contingent upon issuance of a conservation order approving a spacing exception. (Companv Name) assumes the liability of any protest to the spacing . exception that may occur. All dry ditch sample sets submitted to the Commission must be in no greater than 30' sample intervals from below the permafrost or from where samples are first caught and 10' sample intervals through target zones. . A 5f:c--'::ð ~~h~ /<r7/1 L:e- ~VI* . 15 ~ m'J ÍJ-Jkwe//1//D~Æ ~ SóO - J.wj- ;;;J~þ..d. f-R;f~ cð Cß </£(3) ~3. ß Rev: 07/10/02 ajody\templates Geology WELL PERMIT CHECKLIST Company CONOCOPHILLlPS ALASKA INC Well Name: COLVILLE RIV UNIT CD2-18 Program SER Well bore seg 0 PTD#: 203151 0 Field & Pool COLVILLE RIVER. ALPINE OIL - 120100 Initial Classrrype SER /1WINJ GeoArea 890 Unit 50360 On/Off Shore ~ Annular Disposal 0 Administration 1 P~rmit fee ¡:¡ttaçhe~ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ Yes _ _ Change to permit after spud: _ extend well aJQng _same a~imutb an ¡:¡dditionaJ 2000', _ _ _ _ _ _ _ _ 2Le¡:¡s~numberappropriate_ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ Y~s _ _ _ _ _ _ _ Surtaçe in ADL380075, Top prod jnteJ\'al in ADL38ï:207,TD io ASRC NRPA fe_eJease.PJQPosed_ _ _ _ _ _ _ _ _ _ 3 _U_nique welln_a!l1~_and ol!mb_er _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _Y~s _ _ _ _ _ _ _ well_course Ije$wjtbio th~Þoun_ds oUbe CQhtilleJ~i\ler Uoit. _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ 4 WelUQcat~d ina define~ _pool _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ Yes _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ 5 WellJQcat~d proper distance from driJlinQ unitboundary _ _ _ _ _ _ _ _ _ _ _ Y~s _ _ _ _ _ PROPOSED TD WJLLREQUIRE A SPACING EXCEPTION: _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ 6 WeIlJQcat~dpr_operdistancefromQtberwelJs _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ Y~s _SPACING_EXCEPTIONWILL6EREQUIRE_DJfJDQFWELL_\{IOLATESTHE _ _ _ _ _ _ _ __ 7 _S_u{fiçienLaçre¡:¡geay¡:¡ilable indJilliog unjL _ _ _ _ _ _ _ _ _ _ _ _ YeL _ _ _ _ _ _ 50_0~FQOTSEH3ACK BEQUIREMEtIIT Of C0443._RULE3 _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ 8 Jtd~viated, js weJlbQre plaUncJuded _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ Y~s _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ 9 _Qper_ator Onl}' ¡:¡ffeçted party _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ Yes _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ 10 _Operator bas_appropriateJ).ond inJQrce _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ Yes _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ 11 P~rmit can be issl!ed wjtbQut conserva_tion Qrder _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ Y~s _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ Appr Date 12 P~rmit cao be issl!ed wjtbQut ¡:¡d_ministratÏ\leapprovaL _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ Y~s _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ SFD 9/19/2003 13 Can permit be approved before 15-day wait Yes 14 WellJQcat~d within ¡:¡re¡:¡ ¡:¡Ild_strata _authorized by.lojeçtioo Order # (PuUO# in_commeots).{For Y~s _ _ AIO 18 _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ 15 _AJlwelJs_withillJI4_l1Jile_area_ofreyiewjd~otified(Forservjc_ewellOnlYL _ _ _ _ _ _ _ _ _ _ _ _ _ _ Y~s_ _ _ _ _ _ _CRUCD2-.30_ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ __ 16 PJe-produçedinjector; ~urationofpre-pro_duçtionless_th¡:¡n3montbs_(For_servicewelI Qnly) _ _ No_ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ __ 17 ACMP_FindjngofCQnsistency_h_as beenissued_forJbis projeçt _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _NA _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ . _ _ _ _ _ _ _ _ _ _ _ _ _ Engineering 18 _Conductor st(illg_pJQvided _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ Yes _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ .. _ _ _ _ _ _ _ _ 19S_urf¡:¡ce_casing_PJQtects¡:¡lI_kllown_USDWs _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _NA _ _ _NQaqujfers,_perAIOJßAçollclusion3"_ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ __ 20 _CMTv_oladeQuateJo çirc_ulate 011 cOnd_uçtor_& SUJtq;Q _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ Yes _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ 21 _CMTv_oladeQuateJotie-inJQng_stringto_surfçsg_ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ No_ _ _ _ _ _ _ _Annulardisp_osalultimatelyplaoned._ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ __ 22 _CMTwill coyer_aJl koownpro_ductiye bQri;!:Qn_s_ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ No_ _ Open_h_ole_completion planne_d, _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ 23 _Casiog designs adeç ua_te for C..T, 6_&permafr.ost _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ Y~s _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ 24A~equatet¡:¡nkage_oJ[e_serve pit - - _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ Y~s _ _ Rig jse_quippe_dwith steel_pjts. _ NQ rese_rve_pjtplanoed, Waste_to apprQved ¡:¡nnulus or_djsposal welt _ 25 JtaJe-~rilt h¡:¡sa to-403 fQr abandonment be~o apprQved _ _ _ . _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _NA _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ . _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ 26 AdequateweJlbore sepªri'ltjo_n-Pfopose~ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ Y~s _ _ _ _ _ _ _ I?ro~imit}' analysis perfo(l1)e_d, TrayelillQ ç}'lioder patb çalculate_d, ßyroS Pos_siÞle, _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ 27 Jtdjvecterreq_uired,dQesjtmeetreguJations _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _NA _ _ _ _ _ _ _DiYerterwªiverh¡:¡s_b.eeogivenJor_CQ-2pad, _ _ _ _ _ _ _ _. _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ __ Appr Date 28 _DrilliogfJujd_prQgramschematic_&eCl-uipJistadequi'lt~_ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ Y~s_ _ _Maximumexpectedfo(l1)ationpressuœ_8.7_EMW._ MWplallned9.6-9.ßjn_8-1I2"_hole,9.3hreservoir._ WGA 9/19/2003 29 BOPEs,_dothey meetreguJatioo _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ Y~s _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ 30 _BOPE pressra.tiog¡:¡ppropriate;_testto (putpsig ill_comments). _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ Y~s_ _ _ _ _ _ _MASPcalculate_d_at2556psi, 35QO_p$tappropriate_._pp.C_o_usuaJIYteststo_5000psL _ _ _ _ _ _ _ _ _ __ 31 Choke manifold çQmpJies w/APIBF'-53 (May 64) _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ Y~s _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ 32 WQrk wiJl occ_ur withoutoperi'ltioll_sbutdown_ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ Yes _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ 33 Jspresence_QfH2Sg¡:¡s_prob_able _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _.. _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ No _ _ _ _ _ _Thetoe(JD)Qfw~IJCD2-30iswjtbioj/4mileoUhetntendedpath_ofCD2-18.Thisiswithjn_tbeAlpille _ _ _ _ __ 34 Meçbanici'll_coodJUon of wells within AOR verified (for_s_ervice welJ onJy) _ _ _ _ _ _ . _ _ Y~s _ _ _ _ Jeservojr, No welJs_p_enetrateJbe top oUbe Alpine reservQir_withill.114_l1Jil~_of CD2-18's pl¡:¡n_ned enJry._ _ _ _ _ _ _ _ 35 Permit can be iSSl!ed wlo hYdrogen_ s_ulfide me¡:¡sJ,Jres _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ Y~s _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ 36 _Datapreseoted On pote_ntial overpressure _ZOnes _ _ _ _ _ _ _ _ _ _ _ _Y~s _ _ Expected reservojr prenuJe is _8]ppg EMW, willbe _drilled witb 9.0 ~ 9.3 ppg mud. _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ 37 _Seismic_allalysjs_ of sbaJlow g¡:¡s_zooes_ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _NA _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ 38 Seabed _condjtioo Sl!rvey _(if off-shore) _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _NA _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ 39 _ Contact namelpholleJor_wee~ly progress.reports [exploratory only] _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _NA _ _ _ _ _ _ _. _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ - e Appr SFD Date 9/19/2003 Geologic Commissioner: J)~ Date: t/I?Á.-r Engineering Commissioner: Date Public Commissioner Date Revision to permit to drill 2031510: Change to permit after spud - extend well along same azimuth an additional 2000'. BHL change proposed is from 1915' FNL, 2024' FEL, S" 33, T12N, R4E to 152' FNL, 2964' FEL, S. 33, T12N, R4E. Permit 2031510 will be re-issued. Original permit approved by Engineering. Geology. and Commissioners Ruedrich and Palin on Sept 3,2003. NOTE THAT A SPACING EXCEPTION MAY BE REQUIRED IF 500-FOOT SET BACK OF CO 443 IS VIOLATED. . . (~. IU¡ ,,_¿ "~ jÃ\ @ ~ lÂ\ ~) FRANK H. MURKOWSKJ, GOVERNOR AI,ASIiA OIL AND GAS CONSERVATION COMMISSION Chip Alvord Alpine Drilling Leader Leader ConocoPhillips (Alaska), Inc. PO Box 100360 Anchorage, AK 99510 333 w" 7'" AVENUE, SUITE 100 ANCHORAGE, ALASKA 99501-3539 PHONE (907) 279-1433 FAX (907) 276-7542 Re: Colville River Field CD2-18 ConocoPhillips (Alaska), Inc. Permit No: 203-151 Surface Location: 1746' FNL, 1542' FEL, Sec. 2, T11N, R4E, UM Bottomhole Location: 1915' FNL, 2024' FEL, Sec. 33, T12N, R4E, UM Dear Mr. Alvord: Enclosed is the approved application for permit to drill the above referenced development well. This permit to drill does not exempt you from obtaining additional permits or approvals required by law from other governmental agencies, and does not authorize conducting drilling operations until all other required permits and approvals have been issued. In addition, the Commission reserves the right to withdraw the permit in the event it was erroneously issued. Operations must be conducted in accordance with AS 31.05 and Title 20, Chapter 25 of the Alaska Administrative Code unless the Commission specifically authorizes a variance. Failure to comply with an applicable provision of AS 31.05, Title 20, Chapter 25 of the Alaska Administrative Code, or a Commission order, or the terms and conditions of this permit may result in the revocation or suspension of the permit. Please provide at least twenty-four (24) hours notice for a representative of the Commission to witness any required test. Contact the Commission's North Slope petroleum field inspector at 659-3607 (pager). Sincerely, ~~.~ Randy Ruedrich Commissioner BY ORDER OF THE COMMISSION DATED this~ day of September, 2003 cc: Department ofFish & Game, Habitat Section w/o encI. Department of Environmental Conservation w/o encI. Exploration, Production and Refineries Section Drill 0 Re-entry 0 2" Operator Name: ConocoPhillips Alaska, Inc. 3. Address: 1a" Type of Work: ) STATE OF ALASKA ) h"L. ' ALASKA OIL & GAS COMMISSION ? PERMIT TO DRILL ~! 1 b. Current Well Oass: ExploratoryU Development Oil U Multiple Zone 0 '#/ (> StratigraphicTest 0 Service 0 Development Gas 0 Single Zone 0 I ~ 5. Bond: ~ Blanket U Single Well 11. Well Name and Number: Bond No. 59-52-180 CD2-18 6. Proposed Depth: 12. Field/Pool(s): MD: 16750' ~ iVD: 7252' , Colville River Field 7. Property Designation: , , RedrillU P.O. Box 100360 Anchorage, AI< 99510-0360 4a. Location of Well,(Govemmental Section): ALK 380075, 387207, ASRCNPRA02 8. Land Use Permit: Alpine River Pool 13. Approximate Spud Date: 9/15/2003 Surtace: 1746' FNL, 1542' FEL, Sec. 2, T11 N, R4E, UM Top of Productive Horizon: 1000'FNL,3ß5'FWL,Sec.3,T11N,R4E,UM Total Depth: 1915' FNL, 2024' FEL, Sec. 33, T12N, R4E, UM 4b. Location of Well (State Base Plane Coordinates): Surtace:~ 371699 y-5974612" 16. Deviated wells: Kickoff depth: 300 18. Casing Program Size Hole Casing 42" 16" 12.25" 9.625" 8.5" 7" NIA 4.5" 19 Total Depth MD (ft): Casing Structural Conductor Detailed Operations Intennediate Production Liner Perforation Depth MD (ft): 20. Attachments: Rling Fee 0 Property Plat D ADL N/A 9. ~res in Property. 2560 4 (Height above GL): 52 feet 17. Anticipated Pressure (see 20 APe 25.035) Max. Downhole Pressure: 3281 psig'- I Max. Surface Pressure: 2556 psig v' Setting Depth Quantity of Cement Bottom c. f. or sacks TVD (including stage data) 114' 2390' 573 sx AS Lite & 230 sx LiteCrete 7262' 175 sx Class G 7095' 10. KB Elevation Zone- ft. Maximum Hole Angle: 91° Specifications Weight Grade Coupling Length 62.5# H-40 Weld 77' 36# J-55 BTC 3008' 26# L-80 BTG-M 11924' 12.6# L-80 IBT-mod 11280' Top MD 37' 37 37' 32' 14. Distance to Nearest Property. 385' FWL, Sec. 3 15. Distance to Nearest Well within Pool: CD2-3Q I 714' TVD MD 114' 37' 37' 3045' 37' 11961' 11312' 32' PRESENT WELL CONDITION SUMMARY Total Depth TVD (ft): Plugs (measured) (To be completed for Redrill and Re-Entry Operations) Effective Depth MD (ft): Effective Depth TVD (ft): Junk (measured) Length Size Cement Volume MD lVD Perforation Depth iVD (ft): BOP SketchU Diverter Sketdl D Drilling Program~ Seabed Report D 21. Verbal Approval: Commission Representative: 22" I hereby certify that the foregoing is true and corree!¡ to the best of my knowledge. Contact Zane KuenzJer @ 265-1308 Printed Name C. Alvord Title Alpine Drilling Team Leader Signature ?J.. YM"" H _.P~ _.. , F'blt- C. Al...vott.A Phone Date o'ð/z.q /2Þo:3 , - It.v¡r -- Prepared bv Zane Kuenzler Commission Use Only Permit to Drill API Nurrber: Permit Approval See cover letter Nurrber: 203 -IS: I 50- I D 3 - 26 Y Þ 10 - 6D Date: for other requirements Conditions of approval: Samples required D Yes ~No Mud log required CJ,.Y~- g No Hydrogen sulfide measures 0 Yes 8 No Directional survey required .a-Yes Ò No "'- ." -'~ dOAb(.~S-,O~'\c...:>:-) Other: ~\\$~~-\-Q~\~\--, \.....0," ~"'~~~~\,){\~~:fo."~8J-:~~~\\.1sa ~\ , ~ ~()..<:...~" ð~~~" \<.~~ \ ~ ""~"-\- ~c;\~Wç f2c.-,L; t-Þ-- rL aMdSS~ffi Approved by. Form 10-401 Revised 3/2003, Submit in Duplicate O :-"~ . ":' . r"~1: :'i ,;' Time v. Depth Plot U Drilling Ruid Program 0 Date: Shallow Hazard Analysis U 20 MC 25.050 requirements 0 BY ORDER OF THE COMMISSION Date: ,',"7/rIV,) f !1 CD2-18 Drilling Hazards Summary (to be posted in Rig Floor Doghouse Prior to Spud) (See Well Plan Attachment: Detailed Risk Information for further discussion of these risks) 12-1/4" Hole /9-5/8" CasinQ Interval Event Risk Level Conductor Broach Low Well Collision " medium Gas Hydrates Low Running Sands and Gravel Low Abnormal Pressure in Surface Formations >2000' TVO Lost Circulation Low Low 8-1/2" Hole /7" CasinQ Interval Event Risk Level Abnormal Pressure in low Surface Formations >2000' TVO Lost circulation Low Hole swabbing on trips Moderate Abnormal Reservoir Pressure low Hydrogen Sulfide gas Low Mitigation Strategy Monitor cellar continuously during interval. Gyro single shots, traveling cylinder diagrams Monitor well at base of permafrost, increased mud weight, decreased mud viscosity, increased circulating times, controlled drilling rates, low mud temperatures Maintain planned mud parameters, Increase mud weight, use weighted sweeps. Increased mud weight Reduced pump rates, mud rheology, lost circulation material, use of low density cement slurries Mitiqation Strategy BOPE drills, Keep mud weight above 9.6 ppg. Check for flow during connections and if needed, increase mud weight. Reduced pump rates, reduced trip speeds, real time equivalent circulating density (ECO) monitoring, mud rheology, lost circulation material Reduced trip speeds, mud properties, proper hole filling, pumping out of hole, real time equivalent circulating density (ECO) monitoring, weighted sweeps. Well control drills, increased mud weight. No mapped faults occur within 700' of the planned wellbore. HzS drills, detection systems, alarms, standard well control practices, mud scavengers ,6-1/8" Hole / Horizontal Production Hole Event Risk Level Lost circulation moderate Hole swabbing on trips Moderate Abnormal Reservoir Pressure Medium Hydrogen Sulfide gas Low Mitiqation Strateqy Reduced pump rates, reduced trip speeds, real time equivalent circulating density (ECO) monitoring, mud rheology, lost circulation material Reduced trip speeds, Pump out to 7" shoe, mud properties, proper hole filling, pumping out of hole, real time equivalent circulating density (ECO) monitoring, weighted sweeps. BOPE drills, Keep mud weight above 8.8 ppg. Check for flow during connections and if needed, increase mud weight. Well control drills, increased mud weight. HzS drills, detection systems, alarms, standard well control practices, mud scavengers Alpine: CD2-18 ) ) Procedure 1. Move on Doyon 19. 2. Drill 12- %" hole to the surface casing point as per the directional plan. 3. Run and cement 9-5/8" surface casing. 4. Install and test BOPE to 5000 psi. 5. Pressure test casing to 2500 psi. 6. Drill out 20' of new hole. Pel10rm leak off test. 7. Pick up and run in hole with, 8-112" drilling BHA. 8. Drill8-Y2" hole to intermediate casing point in the Alpine Sands. (LWD Program: GR/RES/PWD) ~/ 9. Run and cement 7" casing as per program. Top of cement> 826 feet MD above Alpine reservoir. Carry out a leak off test down the 9-5/8" x r casing annulus to confirm the fracture pressure referenced to the casing shoe. Freeze protect casing annulus and casing. 10. BOPE test to 5000 psi. 11. Run drilling assembly. Pressure test casing to 3500 psi. Drill out and perform formation integrity test to 12.5 ppg EMW. Minimum acceptable leak off for drilling ahead is 11.5 ppg EMW. 12. Drill 6-1/8" horizontal section to well TO (LWD Program: G R/RES/PW D). / 16. Circulate the hole clean and pull out of hole. 17. Run 4-Y2, 12.6#, L-80 tubing with DB nipple, gas lift mandrel(s), and packer. Land hanger. 18. Install 2 way check and pre~sure test hanger seals to 5000 psi. Nipple down BOP. 19. Install tubing head adapter assembly. Pressure test adapter assembly to 5000 psi. Remove 2 way check. 20. Circulate tubing to diesel and install freeze protection in the annulus. 21. Drop ball and set packer. Test tubing and tubing-casing annulus separately to 3500 psi 130 mins. 22. Set BPV and secure well. Move rig off. '" OR r.Rì'~' J,1 Ii,;. .,' .'/" '; I,.. ~ It,.,.{ /)1 ..,"~ " ' Well Proximity Risks: Directional drilling / collision avoidance information as required by 20 ACC 25.050 (b) is provided in following attachments. CD2-19 will be the closest well to CD2-18. Well separation is 10.5 ft at 300 ft MD. Accounting for survey uncertainty, the ellipse-to-ellipse separation is 5.5 ft at 300 ft MD. CD2-17 is another close approach with 11.5 ft of separation at 400 MD and ellipse-to-ellipse separation of 4.6 ft. DrillinÇl Area Risks: There are no high-risk events (e.g. over-pressures zones) anticipated. .' Lost circulation: Faulting within the Alpine reservoir section is considered the most likely cause of lost circulation. Standard LCM material has proved effective in dealing with lost circulation in previous development wells. . Additional care and attention will be given to the higher potential of inducing a kick when drilling horizontally as opposed to vertically. Good drilling practices will be stressed to minimize the potential of taking swabbed kicks. Annular PumpinÇl Operations: Incidental fluids developed trom drilling operations on well CD2-18 will be injected into a permitted annulus on C02 pad or the class 2 disposal well on CD1 pad. The CD2-18 surface/intermediate casing annulus will be flushed with 300 bbls of fresh water prior to freeze protecting with diesel to 2000' TVD. The only significant hydrocarbon zone is the Alpine reservoir and there will be 500' of cement fill above the top of the Alpine as per regulations. Upon completion of CD2-18 form 10-403, Application for Sundry Operations, will be filed. Annular pumping of fluids occurring as a result of drilling operations, per regulation 20 AAC 25.080, could then begin once properly permitted. As stated above, any zones containing significant hydrocarbons will be isolated prior to initiating annular pumping. There will be no USDW's open below the shoe or potable/industrial water wells within one mile of the receiving zone. Reference the enclosed directional drilling plan for other formation markers in this well. Surface casing will be set near the below the base of the Schrader Bluff Formation (C-40). These 300-400' thick shales are part of the, Colville Group and are known to provide vertical barriers to fluid flow in other areas. The maximum volume of fluids to be pumped down the annulus of this well will not exceed 35,000 bbl without the specific permission of the AOGCC. Fluid densities will range from diesel to a maximum of 12.0 ppg for drilling fluid wastes. Using 12.0 ppg fluid and the rig's specified maximum pumping pressure of 1,500 psi for annular injection, the maximum pressure at the surface casing shoe is estimated by: Max Shoe Pressure = (12.0 ppg) * (0.052) * (Surf. Shoe TVD) + 1,500 psi = (12.0 ppg) * (0.052) * (2390') + 1,500 psi = 2,990 psi Pore Pressure = 1,081 psi Therefore Differential = 2991 - 1081 = 1910 psi. The internal casing pressure is conservative, since frictional losses while pumping have not been taken into consideration. The surface and intermediate casing strings exposed to the annular pumping operations have sufficient strength by using the 85% collapse and burst ratings listed in the following table: Wt ! Connection 85% of 85% of OD (ppf) Grade Range Type Collapse Collapse Bu rst Burst 9-5/8" 36 J-55 3 BTC 2,020 psi 1,717 psi 3,520 psi 2,992 psi 7" 26 L-80 3 BTC-Mod 5,410 psi 4,599 psi 7,240 psi 6,154 psi In tli' ¡¡I CD2-18 DRILLING FLUID PROGRAM ) ) SPUD to Intermediate hole to 7" Production Hole 9-5/8"surface casing casing point - 8 Y2" Section - 6 1 /8" 'point - 12 %" Density ,8.8 - 9.6 ppg 9.6 - 9.8 ppg 9.0-9.3 ppg V" PV 1 0 - 25 10 -15 YP ¡20 - 60 15 - 25 25 - 30 Funnel Viscosity 100 - 200 Initial Gels 4-8 10-15 10 minute gels <18 12 - 20 API Filtrate 'Nc - 10 cc / 30 min 4 - 12 cc/30 min (drilling) HPHT Fluid Loss at 160 12 - 14 cc/30 min PH 8.5-9.0 9.0 -10.0 9.0-9.5 KCL 60/0 Surface Hole: A standard high viscosity fresh water / gel spud mud is recommended for the surface interval. Keep flowline viscosity at ± 200 sec/qt while drilling and running casing. Reduce viscosity prior to cementing. Maintain mud weight < 9.6 ppg by use of solids control system and dilution where necessary. Intermediate Hole Section: Fresh water gel/polymer mud system. Ensure good hole cleaning by pumping regular sweeps and maximizing fluid annular velocity. There is potential for lost circulation, particularly after the Alpine is penetrated. Maintain mud' weight at or below 9.8 ppg and be prepared to add loss circulation material. Good filter cake quality, hole cleaning and maintenance of low drill solids (by diluting as required) will all be important in maintaining wellbore stability. Production Hole Section : The horizontal production interval will be drilled with aM-I Flo-Pro drill-in fluid. The base fluid will consist of 6% KCI, with ± 30PPB calcium carbonate bridging material to minimize formation damage. Flo-Vis Polymer and Dual-Flo starch will be used for viscosity and fluid loss control respectively. r' \ O· I~, ." I'\"" :¡ r.,. a ..~ .',.' / ~):' ,'" .~ tl f tl' ~ ¡¡ q~".i ,;;" ,! 31 CD2-18 PRESSURE INFORMATION ANu CASING DESIGN (per 20 ACC 25.005 ( c ) (3,4) and as required in 20 ACC 25.035 (d) (2)) The following presents data used for calculation of anticipated surface pressure (ASP) during drilling of this well : Csg Setting Fracture Pore Casing Size Depth Gradient pressure ASP Drilling (in) MDfTVD(ft) (lbs. I gal) (psi) (psi) 16 114/114 10.9 52 53 9 5/8 3045 I 2390 14.5 1081 1563 7" 11960 I 7262 16.0 3286 2556 N/A 16750 17252 16.0 3281 '" N/A . NOTE: The Doyon 19 5000 psi BOP equipment is adequate. Test BOP's to 5000 psi. PROCEDURE FOR CALCULATING ANTICPATED SURFACE PRESSURE (ASP) ASP is determined as the lesser of 1) surface pressure at breakdown of the formation casing seat with a gas gradient to the surface, or 2) formation pore pressure at the next casing point less a gas gradient to the surface as follows: 1) ASP = [(FG x 0.052) - 0.1]0 Where: ASP = Anticipated Surface pressure in psi FG = Fracture gradient at the casing seat in Iblgal 0.052 = Conversion from Ib./gal to psi/ft 0.1 = Gas gradient in psi/ft D = true Vertical depth of casing seat in ft RKB OR 2) ASP = FPP - (0.1 x D) Where; FPP = Formation Pore Pressure at the next casing point ASP CALCULATIONS 1. Drilling below conductor casing (16") ASP = [(FG x 0.052) - 0.1] D = [(10.9 x 0.052) - 0.1] x 114 = 53 psi OR ASP = FPP - (0.1 x D) = 1081 - (0.1 x 2390') = 842 psi 2. Drilling below surface casing (9 5/8") ASP = [(FG x 0.052) - 0.1] D = [(14.5 x 0.052) - 0.1] x 2390 = 1563 psi OR ASP = FPP - (0.1 x' D) = 3286 - (0.1 x 7262') = 2560 psi 3. Drilling below intermediate casing (7") ASP = FPP - (0.1 x D) = 3281 - (0.1 )( 7252') = 2556 psi '. Ii: TOC @ +1- 10925' MD 16923' TVD (>826' MD above top Alpine) {X'-, Q.~ì"-~ Kò?J, A ~ .. çl- IV- \ q '">' J-) Colville River Field ) CDpaú Injection Well Completion Plan 16" Conductor to 114' Updated 08/29/03 . 4-1/2" Cameo DS Nipple (3.812') at 2000' TVD = 2368' MD 9-5/811 36 ppf J·55 BTC Surface Casing @ 3045' MD I 2390' TVD cemented to surface Packer Fluid mix: 9.~ PPQ KCI Srine with ~OOO' TVD diesel cqp 4-1/2" 12.6 ppf L-80 1ST M tubing run with Jet Lube Run'n'Seal pipe dope Tubing suspended with diesel Completion M.Q TVD Tubing Hanger 32' 32' 4-1/2", 12.6#/ft, 1ST-Mod Tubing Cameo DS6 nipple 2368' 2000' 4-1/2", 12.6#/ft, 1ST-Mod Tubing Camco KSG2- GLM (3.909" ID) 111 00' 7007' 4-1/211, 12.6#/ft, 1ST-Mod Tubing (2) Baker 53 Packer wI millout extension 11200' 7050' 4-1/2", 12.6#/ft, 1ST-Mod Tubing (1) HES IIXNII (3.72511)-67.2° inc 11300' 7091' 4-1/2", 12.6#/ft, 1ST-Mod 10' pup joint WEG 11312' 7095' Camco KBG-2 GLM (3.909" DRIFT ID) wI dummy Baker S3 Packer WI millout extension at +1- 11200' MDI 7050' TVD <200' TVD from top of Alpine _;";.L~i~;. Well TD at 16750' MD I 7252' TVD :/' Top Alpine at 11750' MD 17227' TVD 7" 26 ppf L -80 STC Mod Production Casing @ 11961' 17262' TVD @ +1- 83.0º V n..·· '" r~ - ;', ~ I ~.. ;, ~! (L· ¡:' 1(1) ·1 .':~ Alprne, CD2-18 Well Cementing Requirements 95/8" Surface Casin~ run to 3045' MD / 2390' TVD Cement from 3045' MD to 2545' (500' of fill) with Class G + Adds @ 15.8 PPG, and from 2545' to surface with Arctic Set Lite 3. Assume 300% excess annular volume in permafrost and 50% excess below the permafrost (1561' MD). Lead slurry: System: Tail slurry: System: (2545'-1602') X 0.3132 ft3/ft X 1.5 (50% excess) = 443.0 fe below permafrost 1602' X 0.3132 fe/ft X 4 (300% excess) = 2007.0 fe above permafrost Total volume = 443.0 + 2007.0 = 2450.0 fe => 573 Sx @ 4.28 fe/sk 573 Sx ArcticSet Lite 3 @ 10.7 PPG yielding 4.44 fe/sk, Class G + 30% D053 thixotropic additive, 0.6% D046 antifoamer, 1.5% D079 extender, 1.5% SOOI accelerator, 50% D124 extender and 9% BWOW1 D044 freeze suppressant 500' X 0.3132 fe/ft X 1.5 (50% excess) = 234.9 fe annular volume 80' X 0.4341 ft3/ft = 34.7 ft3 shoe joint volume Total volume = 234.9 + 34.7 = 269.6 fe => 230 Sx @ 1.17 fe/sk 230 Sx Class G + 0.2% D046 antifoamer, 0.3% D065 dispersant and 1 % SOOI accelerator @ 15.8 PPG yielding 1.17 ft3/sk 7" Intermediate Casin~ run to 11961' MD / 7262' TVD Cement from 111961' MD to +/-10925' MD (minimum 500' MD above top of Alpine formation) with Class G + adds @ 15.8 PPG. Assume 40% excess annular volume. Slurry: System: (11961' - 10925') X 0.1268 ft3/ft X 1.4 (40% excess) = 183.9 ft3 annular vol. 80' X 0.2148 ft3/ft = 17.2 ft3 shoe joint volume Total volume = 183.9 + 17.2 = 201.1 ft3 => 175 Sx @ 1.15 ft3/sk 175 Sx Class G + 0.2% D046 antifoamer, 0.25% D065 dispersant, 0.25% D800 retarder and 0.18% D167 fluid l?ss additive @ 15.8 PPG yielding 1.15 ft31 1 By Weight Of mix Water, all other additives are BWOCement i__ Alaska North North S/fJp . Plan: C . ·4fÇØg~i18 (wp03) -~ Sperry-Sun Drilling Services "Wi1" 8 Atlgúst, 2003 (a :r:cC~!J roposal Report ~...-- .:.-~~_.. 28 August, 2003 ~ ~ ~.-..-- Surface Coordinates: 5974612.15 N, 371699.38 E (70020' 19.9353" N, 151002'27.9765" W) Grid Coordinate System: NAD27 Alaska State Planes, Zone 4 Kelly Bushing: 52.0Off above Mean Sea Level ~ 5pe......y-sul! DR1LLING-""SEA'Vrc:es A Hafliburton Company Proposal Ref: pro280 ~..,-,._..._---_.~.,._'.'- SITE DETAilS FlliLD DKI'AILS Alpine CD2 Site Centre Northing: 5974641.66 Easting: 371696.24 Water Depth: 0.00 Positional Uncertainty: 0_00 Convergence: -0.980 ColviUe River Unit North SIOI)e Alaska United States Geodetic System: US State Plane Coordinate System 1927 Ellipsoid: NAD27 (Clarke 1866) Zone: Alaska, Zone 4 Magnctic Modcl: BGGM2002 System Datum: Mean Sea Level Local North: True North Name ConocJPhillips WELL DETAILS +N/-S +F.J-W -29.45 3.64 Northing 5974612.15 Easting Latitude Longitude Plan: CD2-18 371699.38 70020'19.935N 151°02'27.976W 8000- (;D2~18 (wp03) 6000- Open Hole I _ CD2-I8 (Toe) 4000- spe"""'Y-5un O·Rì...:.....IÎG Se·RV'CeS ,\ 1f..,,'..~.1",'M:10:\ ~"(~~,\....'\ c '5 i ~ ! ~ 2000- c13 CD2-18 (7" Csg) . - - 0- ~ ,- . ? .5/8" p-- A -2000- I I I I I I I I I I , I I I I , I I I I I I I I I I I I I I I I , I I I I I I I I I I I I I I I I , I I I I I I I I I I I I I I I I I I I -12000 -10000 -8000 -6000 -4000 -2000 West(-)/East(+) [2ooofllln] SECTION DETAILS See MD Inc Azi TVD +N/-S +E/-W DLeg TFace VSec Target 1 36.10 0.000 0.000 36.10 0.00 0.00 0.00 0.000 0.00 2 300.00 0.000 0.000 300.00 0.00 0.00 0.00 0.000 0_00 3 2126.28 54_788 272.248 1860.41 31.71 -808.02 3.00 0.000 409.12 4 10606.66 54.788 272.248 6750.17 303.45 -7731.40 0.00 0.000 3914.62 5 12251.85 90.344 331.862 7279.00 1150.40 -8925.10 4.00 71.028 5224.51 CD2-1S (Heel) 6 16751.95 90.344 331.885 7252.00 5119.01 -11046.48 0.00 89.824 9724.52 CD2-1S (Toe) ) FIELD DETAILS ) Colville River Unit North Slope Alaska United States spe¡ti'Y-5un P]'JJ;~b;JJ;"·G······ss..~wYJj;;wí;;~ ..1. U..\.U,I:tM.=Ø;', n.'" f:(.:\II~.\N\: Geodetic System: US State Plane Coordinate System 1927 Ellipsoid: NAD27 (Clarke 1866) Zone: Alaska, Zone 4 Magnetic Model: BGGM2002 System Datum: Mean Sea Level Local North: True North ConocJ'Phillips SITE DETAILS Alpine CD2 Site Centre Northing: 5974641.66 Easting: 371696.24 Water Depth: 0.00 Positional Uncertainty: 0.00 Convergence: -0.980 WELL DETAilS Name +N/-S -29.45 +E/-W Plan: CD2-18 3.64 Northing 5974612.15 Easting Latitude Longitude Slot 371699.38 70020'19.935N 151°02'27.976W N/A CD2-18 (wp03) -A-.. ,. MD S<," Hold 0° 300 MD Start BuilL 3.00 1860 _~1: 55° 2126 MD StarClold 2000 ~~ 195/8".1 'C S I .c Õ. ~ ~ :e ~ ë Eo< ~ooo 6000 6750 3915 '. 55° 10607 MD Start DLS 4.0< TFO 71.03 ...,r - --- :- - - -- - - .,..,.. - .,. - - - - - -- - ~··I'.'... IE] > .............. 90° 12252 MD Start DLS 0.00 TFC 89.82 " .. .. ".,,".... ....... ......... ... ... "......,. "" "'" =.2~2,= =.= "" "" =.= = "'" ~~ = =.= = = =.... =f-=:':: ·~"",..J,,,,....,,,,.""."".t...,.,...,,,.."'..,,...,.,:'''':..,.···,··,.·.·,,··:."".""..'.".""." _ 7279 I AI Dine C I . ,,". I ì CD2-18 (Heel) I I CD2-18 (7" CSR) r 90° . 6752 MD TD ~~~~,~OI~..I", .. -..q 1 CD2-18 (Toe) I 'r 6000 I ·2000 2000 4000 6000 8000 1??oo 12000 Vertical Section at 331.85° [2OOOftIIn] SECTION DETAILS See MD Inc Azi TVD +N/-S +EI-W DLeg TFace VSec Target 1 36.10 0.000 0.000 36.10 0.00 0.00 0.00 0.000 0.00 2 300.00 0.000 0.000 300.00 0.00 0.00 0.00 0.000 0.00 3 2126.28 54.788 272.248 1860.41 31.71 -808.02 3.00 0.000 409.12 4 10606.66 54.788 272.248 6750.17 303.45 -7731.40 0.00 0.000 3914.62 5 12251.85 90.344 331.862 7279.00 1150.40 -8925.10 4.00 71.028 5224.51 CD2-18 (Heel) 6 16751.95 90.344 331.885 7252.00 5119.01 -11046.48 0.00 89.824 9724.52 CD2-18 (Toe) '>.~ DrillQuest 3.03.02.002 Page 2 of 16 28 August, 2003 - 15:19 Sperry-Sun Drilling Services Proposal Report for Plan: CD2-18 - CD2-18 (wp03) Revised: 28 August, 2003 North Slope, Alaska Alaska North Slope Measured Sub-Sea Vertical Local Coordinates Global Coordinates Depth Incl. Azim. Depth Depth Northings Eastings Northlngs Easting"~.;\ Räte''V'? :jSection Comment (ft) (ft) (ft) (ft) (ft) (ft) 0.00 0.000 0.000 -52.00 0.00 0.00 N 0.00 E 5974612.15 N 37,1699.38E 0.00 SHL (1746' FNL & 1542' FEL, SEC 2 T11 N - R4E) 50.00 0.000 0.000 -2.00 50.00 0.00 N 0.00 E 59749,13,,15 N ,".371699.38 E 0.000 0.00 100.00 0.000 0.000 48.00 100.00 0.00 N 0.00 E 5~6,g~121'1,5 N ¡'~~;l699.38 E 0.000 0.00 150.00 0.000 0.000 98.00 150.00 0.00 N 0.00 E. i;.ég'4~p12)1'B}N 371699.38 E 0.000 0.00 200.00 0.000 0.000 148.00 200.00 0.00 N . ª\j¡ .:~~~~:4~~~ .1'5N 371699.38 E 0.000 0.00 250.00 0.000 0.000 198.00 250.00 0.00 N 0:00 E:¡,: .".<$91~612.15 N 371699.38 E 0.000 0.00 . 300.00 0.000 0.000 248.00 300.00 0.00 N O.OOE 5974612.15 N 371699.38 E 0.000 0.00 Begin Dir @3°/100ft (in 12-1/4" Hole) 300ft MD, 300ft TVD 350.00 1.500 272.250 297.99 349.99 0.65W 5974612.19 N 371698.73 E 3.000 0.33 400.00 3.000 272.250 347.95 399.95 2.62W 5974612.30 N 371696.77 E 3.000 1.32 450.00 4.500 272.250 397.85 449.85 5.88W 5974612.48 N 371693.50 E 3.000 2.98 ~":; -0;. 500.00 6.000 272.250 447.63 499.63 N 1 0.45 W 5974612.74 N 371688.93 E 3.000 5.29 ~.:=.~# 550.00 7.500 272.250 497.29 ",¡j¡;¡§ 4 9.2 9 . 0.64 N 16.33 W 5974613.07 N 371683.07 E 3.000 8.27 600.00 9.000 272.250 '1~R~¡~ 0.92 N 23.50 W 5974613.48 N 371675.90 E 3.000 11.89 650.00 10.500 272.250 6~~¡Ø~ 1.26 N 31.96 W 5974613.95 N 371667.45 E 3.000 16.18 700.00 12.000 272.250 697.08 1.64 N 41.70 W 5974614.50 N 371657.71 E 3.000 21.11 750.00 13.500 272.250 745.85 2.07 N 52.73 W 5974615.12N 371646.69 E 3.000 26.69 800.00 15.000 272.250 794.31 2.55 N 65.03 W 5974615.82 N 371634.41 E 3.000 32.92 850.00 16.500 272;250 790.43 842.43 3.09 N 78.59 W 5974616.58 N 371620.86 E 3.000 39.78 900.00 18.000 272.250 838.18 890.18 3.67 N 93.40 W 5974617.42 N 371606.05 E 3.000 47.28 950.00 19.500 272.250 885.52 937.52 4.30 N 109.46 W 5974618.32 N 371590.01 E 3.000 55.41 . 1000.00, 21.000 272.250 932.43 984.43 4.98 N 126.75 W 5974619.30 N 371572.73 E 3.000 64.17 1050.00'1;;,1. 22.500 272.250 978.87 1030.87 5.71 N 145.27 W 5974620.34 N 371554.23 E 3.000 73.54 1072.93 23.188 272.250 1000.00 1052.00 6.06 N 154.16 W 5974620.84 N 371545.35 E 3.000 78.04 West Sak 1100.00 24.000 272.250 1024.81 1076.81 6.48 N 164.99 W 5974621.45 N 371534.53 E 3.000 83.52 1150.00 25.500 272.250 1070.22 1122.22 7.30 N 185.90 W 5974622.63 N 371513.63 E 3.000 94.11 1200.00 27.000 272.250 1115.06 1167.06 8.17 N 208.00 W 5974623.88 N 371491.55 E 3.000 105.30 1250.00 28.500 272.250 1159.31 1211.31 9.09 N 231.26 W 5974625.19 N 371468.31 E 3.000 117.08 1300.00 30.000 272.250 1202.93 1254.93 10.05 N 255.68 W 5974626.57 N 371443.91 E 3.000 129.43 1350.00 31 .500 272.250 1245.90 1297.90 11 .05 N 281.22 W 5974628.01 N 371418.39 E 3.000 142.37 1400.00 33.000 272.250 1288.18 1340.18 12.10 N 307.88 W 5974629.51 N 371391.75 E 3.000 155.86 DrillQuest 3.03.02.002 604.84 625.51 646.17 656.06 C-40 666.84 501 .52 522.18 542.85 .__ 563.51 584.18 418.86 439.52 460.19 480.85 409.07 End Dir, Start Sail @ 54.790° : 2126.33ftMD,1860.44ftTVD 319.66 338.67 358.12 377.98 398.24 - 248.15 259.30 Pennafrost 265.32 282.97 301.08 169.91 184.51 199.64 215.30 231.47 Comment North Slope, Alaska onoo onoo onoo onoo onoo 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 3.000 3.000 3.000 3.000 3.000 3.000 3.000 3.000 3.000 3.000 3.000 370505.59 E 370464.80 E 370424.02 E 370404.49 E 370383.23 E 370709.53 E 370668.74 E 370627.95 E 370587.17 E 370546.38 E 370872.68 E 370831.89 E 370791.10 E 370750.31 E 370891 .98 E 371068.47 E 371030.94 E 370992.56 E 370953.36 E 370913.36 E 371209.60 E 371187.60 E 371175.72 E 371140.88 E 371105.13 E 5974679.53 N 5974681.83 N 5974684.13 N 5974685.24 N 5974686.44 N 5974668.02 N 5974670.32 N 5974672.62 N 5974674.92 N 5974677.23 N 5974658.81 N 5974661.11 N 5974663.41 N 5974665.72 N 5974657.72 N 5974647.76 N 5974649.88 N 5974652.04 N 5974654.26 N 5974656.51 N Page 3 of 16 1194.77 W 1235.59 W 1276.41 W 1295.95 W 1317.23 W 990.66 W 1031.48 W 1072.30 W 1113.13 W 1153.95 W 827.38 W 868.20 W 909.02 W 949.84 W 808.06 W 631.43 W 668.99 W 707.40 W 746.63 W 786.67 W ,49öJ8 V/. ,,":::5974639.79 N " 51:2:2Ô;\^I ~:{ 5974641.04 N -S24.09.W ,"- "5974641.71 N ·S58.95W' 5974643.67 N 594.74 W 5974645.69 N 5974631.08 N 5974632.70 N 59746a4.39 N 5~7~~~13 N 5974637.94\N Global Coordinates Northings Eastin (ft) 335.64 W 364.47 W 394.36 W 425.29 W 457.24 W 46.94 N 48.55 N 50.15 N 50.92 N 51.75 N 38.92 N 40.53 N 42.13 N 43.73 N 45.34 N 32.51 N 34.11 N 35.72 N 37.32 N 31.75 N 13.19 N 14.32 N 15.49 N 16.71 N 17.96 N Local Coordinates Northings Eastlngs (ft) (ft) Sperry-Sun Drilling Services Proposal Report for Plan: CD2-f8 - CD2-f8 (wp03) Revised: 28 August, 2003 2133.54 2162.37 2191.20 2205.00 2220.03 1989.40 2018.23 2047.06 2075.89 2104.72 1719.30 1752.27 1784.~4> . :::1815.19' . . 184~;if: .1860.44 1577.95 1602.00 1614.66 1650.47 1685.36 1381.76 1422.59 1462.65 1501.91 1540.35 Vertical Depth (ft) 2081 .54 2110.37 2139.20 2153.00 2168.03 1937.40 1966.23 1995.06 2023.89 2052.72 1667.30 1700.27 1732.24 1763.19 1793.11 . 11808.44 1525.95 1550.00 1562.66 1598.47 1633.36 1329.76 1370.59 1410.65 1449.91 1488.35 Sub-Sea Depth (ft) 272.250 272.250 272.250 272.250 272.250 ·..-272.250 \{?t272.250 . 272.250 272.250 272.250 272.250 272.250 272.250 272.250 272.250 272.250 272.250 272.250 272.250 272.250 272.250 272.250 272.250 272.250 272.250 272.250 Azim. 28 August, 2003 - 15:19 54.790 54.790 54.790 54.790 54.790 2600.00 2650.00 2700.00 2723.93 2750.00 ~ ~ .. 2350.00· 54.790 2400.00;r;J~s:t!54.19b 2450.00'i~i;Ä 54.790 2500.00 l>'·' 54.790 2550.00 54.790 ." j ':f~ I~ 54.790 48.000 49.500 51.000 52.500 54.000 42.000 42.979 43.500 45.000 46.500 34.500 36.000 37.500 39.000 40.500 Inct. -"C"""'~ _~;aa ..J 2126.33 J ..~.. ~ . ~ ~. ,:-.;'.:;-,<=:t.~-;:.,>.., '<-"'::\0 ~4::::,::::;::t:';..·~ 2150.00 54.790 272~5Ó 'u 1~~~2.09' 1874.09 2200.00 54.790 .272;250'·· i'âŠO.91 1902.91 2250.00 54.7,90·· :-27,2250 . 1879.74 1931.74 2300.00 ... 54.790 272.25Ô· 1908.57 1960.57 1900.00 1950.00 -- 2000.00 2050.00 2100.00 ~-Crc;:'.;~-'fj .--3/ a 1700.00 1732.62 1750.00 1800.00 1850.00 1450.00 1500.00 1550.00 1600.00 1650.00 Measured Depth (ft) Alaska North Slope DriflQuest 3.03.02.002 Page 4 of 16 28 August, 2003 - 15:19 Sperry-Sun Drilling Services Proposal Report for Plan: CD2-18 - CD2-18 (wp03) Revised: 28 August, 2003 North Slope, Alaska Alaska North Slope Measured Sub-Sea Vertical Local Coordinates Global Coordinates Depth Inet. Azim. Depth Depth Northings Eastings Northings Eastings, Rate ..... ··';Seetion Comment (ft) (ft) (ft) (ft) (ft) (ft) (ft) 2800.00 54.790 272 .250 2196.86 2248.86 53.36 N 1358.05 W 5974688.74 N 370342.44 'E ;'0.000 687.50 2850.00 54.790 272.250 2225.69 2277.69 54.96 N 1398.87 W 5974691.04 N 370301.65E 0.000 708.17 2900.00 54.790 272.250 2254.52 2306.52 56.57 N 1439.69 W 597 4§gª~34 N "'370260.87 E 0.000 728.83 2950.00 54.790 272.250 2283.35 2335.35 58.17 N 1480.51 W 5~§ftP9q~§;~ N ;~1º;?20.08 E 0.000 749.50 3000.00 54.790 272.250 2312.17 2364.17 59.77 N 1521 .33 W.;..59~4p97.~gtN 37Ò!179.29 E 0.000 770.1 6 ~ 3044.79 54.790 272.250 2338.00 2390.00 61.21 N y:¡.;T"ij'5914!fÖO.01 N 370142.75 E 0.000 788.68 9-5/8" Gsg Pt ... Drill out 8-1/2" Hole: 3048 ft MD, 2390 ft TVD 9 5/8" Gsg Pt 3050.00 54.790 272.250 2341 .00 2393.00 '4r1;'Hlin'562.15 W' 5974700.25 N 370138.51 E 0.000 790.83 ·<~h,,<- ;c~~ 3076.01 54.790 272.250 2356.00 2408.00 q;;';~ 583.39 W 5974701.45 N 370117.29 E 0.000 801.58 G-30 ~~~ 3100.00 54.790 272.250 2369.83 2421.83 \1'602.97 W 5974702.55 N 370097.72 E 0.000 811 .50 3150.00 54.790 272.250 2398.66 2450.66 1643.80 W 5974704.85 N 370056.93 E 0.000 832.16 3200.00 54.790 272.250 2427.49 2479.49· N 1684.62 W 5974707.15 N 370016.14 E 0.000 852.83 3250.00 54.790 272 .250 2456.32 2508.32 67.79 N 1725.44 W 5974709.46 N 369975.36 E 0.000 873.49 3300.00 54.790 272.250 2485.15 2537.15 69.40 N 1766.26 W 5974711.76 N 369934.57 E 0.000 894.16 3350.00 54.790 272.250 2513.98 2565.98 71 .00 N 1807.08 W 5974714.06 N 369893.78 E 0.000 914.82 3400.00 54.790 272.250 2542.80 2594.80 72.60 N 1847.90 W 5974716.36 N 369852.99 E 0.000 935.49 3450.00 54.790 27~..g5Ø'o· ···.~?§71 2623.63 74.21 N 1888.72 W 5974718.66 N 369812.21 E 0.000 956.15 3500.00 54.790 272.250 26ÔO.46 2652.46 75.81 N 1929.54 W 5974720.97 N 369771 .42 E 0.000 976.82 3550.00 54.790 . 272.250 . 2629.29 2681 .29 77.42 N 1970.36 W 5974723.27 N 369730.63 E 0.000 997.48 3600.00";; 54.790 272.250 2658.12 2710.12 79.02 N 2011.18 W 5974725.57 N 369689.85 E 0.000 1018.15 3650.00 54.790 . 272.250 2686.95 2738.95 80.62 N 2052.00 W 5974727.87 N 369649.06 E 0.000 1038.81 3700.00. 54.790 ';;!;\;272.250 2715.78 2767.78 82.23 N 2092.82 W 5974730.17 N 369608.27 E 0.000 1059.48 3728.14'/ 54.790 272.250 2732.00 2784.00 83.13 N 2115.80W 5974731.47 N 369585.32 E 0.000 1071 .11 G-20 3750.00 ..... 54.790 272.250 2744.61 2796.61 83.83 N 2133.64 W 5974732.48 N 369567.48 E 0.000 1080.14 3800.00 54.790 272.250 2773.43 2825.43 85.43 N 2174.46 W 5974734.78 N 369526.70 E 0.000 1100.81 3850.00 54.790 272.250 2802.26 2854.26 87.04 N 2215.29 W 5974737.08 N 369485.91 E 0.000 1121.47 3900.00 54.790 272.250 2831.09 2883.09 88.64 N 2256.11 W 5974739.38 N 369445.12 E 0.000 1142.14 3950.00 54.790 272.250 2859.92 2911.92 90.25 N 2296.93 W 5974741.69 N 369404.33 E 0.000 1162.80 - 4000.00 54.790 272.250 2888.75 2940.75 91 .85 N 2337.75 W 5974743.99 N 369363.55 E 0.000 1183.47 4050.00 54.790 272.250 2917.58 2969.58 93.45 N 2378.57 W 5974746.29 N 369322.76 E 0.000 1204.13 4100.00 54.790 272.250 2946.41 2998.41 95.06 N 2419.39 W 5974748.59 N 369281.97 E 0.000 1224.80 Dri/IQuest 3.03.02.002 1844.76 1865.42 1886.09 1906.75 1927.42 1762.10 1782.76 1803.43 1824.09 1826.64 K-3 Marker - 1658.77 1679.43 1700.10 1720.76 1741.43 1555.44 1576.11 1596.77 1617.44 1638.10 1452.12 1472.78 1493.45 1514.11 1534.78 ~ 1348.79 1369.46 1390.12 1410.79 1431 .45 1245.46 1266.13 1286.80 1307.46 1328.13 Comment North Slope, Alaska 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 368058.35 E 368017.57 E 367976.78 E 367935.99 E 367895.20 E 368221.50 E 368180.71 E 368139.93 E 368099.14 E 368094.10 E 368425.44 E 368384.65 E 368343.86 E 368303.08 E 368262.29 E 368629.38 E 368588.59 E 368547.80 E 368507.01 E 368466.23 E 368833.31 E 368792.52 E 368751.74 E 368710.95 E 368670.16 E 369037.25 E 368996.46 E 368955.67 E 368914.89 E 368874.10 E 5974817.65 N 5974819.96 N 5974822.26 N 5974824.56 N 5974826.86 N 5974808.45 N 5974810.75 N 5974813.05 N 5974815.35 N 5974815.64 N 5974796.94 N 5974799.24 N 5974801.54 N 5974803.84 N 5974806.14 N 5974785.42 N 5974787.73 N 5974790.03 N 5974792.33 N 5974794.63 N 5974773.91 N 5974776.22 N 5974778.52 N 5974780.82 N 5974783.12 N 5974750.89 N 5974753.20 N 5974?~,50 N 5~7 4757;.80 N 5974760~1Ò N ".\ :;~, : . , ,,·':S974ið2.40 N 5974764.71 N , 5974767.01 N 5974769.31 N 5974771.61 N Global Coordinates Northings Eastin (ft) Page 5 of 16 3644.01 W 3684.83 W 3725.65 W 3766.47 W 3807.29 W 3480.73 W 3521.55 W 3562.37 W 3603.19 W 3608.23 W 3276.62 W 3317.44 W 3358.27 W 3399.09 W 3439.91 W 3072.52 W 3113.34 W 3154.16 W 3194.98 W 3235.80 W 2868.42 W 2909.24 W 2950.06 W 2990.88 W 3031.70 W 2460.21 W 2501.03 W 2541.85 W 2582.67 W 2623.49 W d!,,~.~66"4i¿1 ~;. ",;'> :·'21C}s.t~~iW . 2745.95:W 786.78 "Vi' 827.60 W 143.17 N 144.78 N 146.38 N 147.99 N 149.59 N 136.76 N 138.36 N 139.97 N 141.57 N 141.77 N 128.74 N 130.34 N 131.95 N 133.55 N 135.15 N 120.72 N 122.32 N 123.93 N 125.53 N 127.14 N 96.66 N 98.27 N 99.87 N 101.47 N 103.08 N Local Coordinates Northings Eastings (ft) (ft) Sperry-Sun Drilling Services Proposal Report for Plan: CD2-18 - CD2-18 (wp03) Revised: 28 August, 2003 3863.27 3892.10 3920.93 3949.75 3978.58 3747.95 3776.78 3805.61 3834.44 3838.00 3603.81 3632.64 3661.47 3690.30 3719.12 3811.27 3840.10 3868.93 3897.75 3926.58 3695.95 3724.78 3753.61 3782.44 3786.00 3551.81 3580.64 3609.47 3638.30 3667.12 272.250 272.250 272.250 272.250 272.250 272.250 272.250 272.250 272.250 272.250 28 August, 2003 - 15:19 54.790 54.790 54.790 54.790 54.790 54.790 54.790 54.790 54.790 54.790 5600.00 5650.00 5700.00 5750.00 5800.00 5400.00 5450.00 5500.00 5550.00 5556.17 "" :;f~. "\:.':"': '~,~¡.:; 5150.00' .'~·54?90'.'. ,,272.250 5200.00 '. ,:54:7~O.-" '::~ 272.250 5250.00';';i<" 54.790 ·:,:~272.250 5300.00·1~2,:~> 54.790 . 272.250 5350.00 i." 54.790 272.250 54.790 272.250 54.790 272.250"" 54.790 27:2.25i:f:". 54.790.,.272.250 : 3~94.15 54.790"<27.2~250" 3522.98 " . -'"Y''' 3171.38 3200.21 3229.04 3257.87 3286.69 3027.24 3056.06 3084.89 3113.72 3142.55 Vertical Depth (ft) 3119.38 3148.21 3177.04 3205.87 3234.69 2975.24 3004.06 3032.89 3061.72 3090.55 Sub-Sea Depth (ft) 272.250 272.250 272.250 272.250 272.250 272.250 272.250 272.250 272.250 272.250 272.250 272.250 272.250 272.250 272.250 Azim. 54.790 54.790 54.790 54.790 54.790 54.790 54.790 54.790 54.790 54.790 54.790 54.790 54.790 54.790 54.790 Incl. 4900.00 4950.00 5000.00 5050.00 5100.00 4650.00 4700.00 4750.00 4800.00 4850.00 .~._-~-=... ~J h"'ì j 4400.00 4450.00 4500.00 4550.00 4600.00 4150.00 4200.00 4250.00 4300.00 4350.00 Measured Depth (ft) Alaska North Slope DrillQuest 3.03.02.002 2506.04 2526.71 2547.37 2568.04 2588.70 2402.72 2423.38 2444.05 2464.71 2485.38 2299.39 2320.06 2340.72 2361 .39 2382.05 2196.06 2216.73 2237.40 2258.06 2278.73 2092.74 2113.40 2134.07 2154.73 2175.40 Base K-2 Cycle 2010.08 2030.74 2048.86 2051.41 2072.07 K-2 Marker 1948.08 1966.42 1968.75 1985.06 1989.41 Basal K-3 Sand Comment North Slope, Alaska 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 ,I'Q.OOO 0.000 0.000 0.000 0.000 366753.16 E 366712.37 E 366671 .58 E 366630.80 E 366590.01 E 366957.10 E 366916.31 E 366875.52 E 366834.73 E 366793.95 E 367161.03 E 367120.25 E 367079.46 E 367038.67 E 366997.88 E 367364.97 E 367324.18 E 367283.39 E 367242.61 E 367201.82 E 367568.91 E 367528.12 E 367487.33 E 367446.54 E 367405.76 E 367732.05 E 367691 .27 E 367655.51 E 367650.48 E 367609.69 E 5974891.32 N 5974893.62 N 5974895.93 N 5974898.23 N 5974900.53 N 5974879.81 N 5974882.11 N 5974884.41 N 5974886.72 N 5974889.02 N 5974868.30 N 5974870.60 N 5974872.90 N 5974875.21 N 5974877.51 N 5974856.79 N 5974859.09 N 5974861 .39 N 5974863.70 N 5974866.00 N 5974845.28 N 5974847.58 N 5974849.88 N 5974852.19 N 5974854.49 N 5~74836.07 N ,/.,,§974838.37 N 5974840.39 N 5974840.68 N 5974842.98 N 5974829.16 N 5974831.21 N 59748~1~47 N 5974833.28 N ?9?tW33.\z,oN Global Coordinates Northlngs Easting~& (ft) ...... Page 6 of 16 4950.27 W 4991.09 W 5031.91 W 5072.74 W 5113.56W 4746.17 W 4786.99 W 4827.81 W 4868.63 W 4909.45 W 4542.07 W 4582.89 W 4623.71 W 4664.53 W 4705.35 W 4337.96 W 4378.78 W 4419.60 W 4460.42 W 4501.25 W 4133.86 W 4174.68 W 4215.50 W 4256.32 W 4297.14 W 3848.11 W 3884.35 W 3888.93 W 3921.16W 3929.76 W ~.~7öf~ 4Ql';~ .4~: It7.18,¥X 52.22 W W 194.50 N 196.10 N 197.70 N 199.31 N 200.91 N 186.48 N 188.08 N 189.69 N 191.29 N 192.89 N 178.46 N 180.06 N 181.67 N 183.27 N 184.87 N 170.44 N 172.04 N 173.65 N 175.25 N 176.85 N 151.19N 152.62 N 152.80 N 154.06 N 154.40 N Local Coordinates Northings Eastings (ft) (ft) Sperry-Sun Drilling Services Proposal Report for Plan: CD2-18 - CD2-18 (wp03) Revised: 28 August, 2003 4785.79 4814.62 4843.45 4872.27 4901 .10 4641 .64 4670.47 4699.30 4728.13 4756.96 4497.50 4526.33 4555.16 4583.99 4612.82 4093.90 4122.73 4148.00 4151 .56 4180.38 4007.41 4033.00 4036.24 4059.00 4065.07 Vertical Depth (ft) 4733.79 4762.62 4791.45 4820.27 4849.10 4589.64 4618.47 4647.30 4676.13 4704.96 4445.50 4474.33 4503.16 4531.99 4560.82 4041 .90 4070.73 4096.00 4099.56 4128.38 3955.41 3981 .00 3984.24 4007.00 4013.07 Sub-Sea Depth (ft) 272.250 272.250 272.250 272.250 272.250 272.250 272.250 272.250 272.250 272.250 272.250- 272.250 272.250 272.250 272.250 272.250 272.250, .., 272250 272.250 272.250 272.250 272.250 272.250 272 .250 272.250 272.250 272.250 272.250 272.250 272.250 272.250 272.250 272.250 272.250 272.250 Azim. 28 August, 2003 - 15:19 54.790 54.790 54.790 54.790 54.790 54.790 54.790 54.790 54.790 54.790 7200.00 7250.00 7300.00 7350.00 7400.00 6950.00 <' 7000.00 7050.00 7100.00 7150.00 6700.00 54.790 6750.00 54.790 6800.00, ' 54.790 6850.00h 54.790 6900.00 54.790 54.790 54.790 54.790 54.790 54.790 54.790 54.790 54.790 54.790 54.790 54.790 54.790 54.790 54.790 54.790 54.790 54.790 54.790 54.790 54.790 Incl. 6450.00 6500.00 6550.00 6600.00 6650.00 .~ ~, --~ ~=:-_~ 6200.00 6250.00 6300.00 6350.00 6400.00 -- -~ ~~ - '. I. -~J ~ ,. 6000.00 6050.00 6093.83 6100.00 6150.00 5850.00 5894.38 5900.00 5939.47 5950.00 Measured Depth (ft) Alaska North Slope DrillQuest 3.03.02.002 3208.66 3229.33 3249.99 3270.66 3291 .32 3105.33 3126.00 3146.66 3167.33 3188.00 -- 3002.01 3022.67 3043.34 3064.00 3084.67 2898.68 2919.35 2940.01 2960.68 2981 .34 Albian 97 2816.02 2836.69 2851 .71 2857.35 2878.02 -- 2712.70 2733.36 2754.03 2774.69 2795.36 2609.37 2630.03 2650.70 2671 .36 2692.03 Comment North Slope, Alaska 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 365366.39 E 365325.60 E 365284.82 E 365244.03 E 365203.24 E 365570.33 E 365529.54 E 365488.75 E 365447.97 E 365407.18 E 365774.26 E 365733.48 E 365692.69 E 365651 .90 E 365611.12 E 365978.20 E 365937.41 E 365896.63 E 365855.84 E 365815.05 E 366141.35 E 366100.56 E 366070.92 E 366059.78 E 366018.99 E 366345.29 E 366304.50 E 366263.71 E 366222.92 E 366182.14 E 5974969.59 N 5974971.89 N 5974974.20 N 5974976.50 N 5974978.80 N 5974958.08 N 5974960.38 N 5974962.69 N 5974964.99 N 5974967.29 N 5974946.57 N 5974948.87 N 5974951.18 N 5974953.48 N 5974955.78 N 5974935.06 N 5974937.36 N 5974939.66 N 5974941 .97 N 5974944.27 N 5974925.85 N 5974928.15 N 5974929.83 N 5974930.46 N 5974932.76 N 5974902.83 N 5974905.13 N 5974ªQl,,44 N 5~74~9.74 N "_ - ?97,4~12~~~ -·'~5974á1;4.34 N :. .0 5914916.64 N - 5974918.95 N 5974921.25 N 5974923.55 N Global Coordinates Northings Easting (ft) Page 7 of 16 6338.18 W 6379.00 W 6419.82 W 6460.64 W 6501.46 W 6134.07 W 6174.89 W 6215.72 W 6256.54 W 6297.36 W 5929.97 W 5970.79 W 6011.61 W 6052.43 W 6093.25 W 5725.87 W 5766.69 W 5807.51 W 5848.33 W 5889.15 W 249.03 N 250.63 N 252.24 N 253.84 N 255.44 N 241.01 N 242.61 N 244.22 N 245.82 N 247.42 N 232.99 N 234.59 N 236.20 N 237.80 N 239.40 N 224.97 N 226.57 N 228.18 N 229.78 N 231.39 N 5562.58 W 5603.40 W 5633.07 W 5644.23 W 5685.05 W ,,' ,,; 5"35M4~ W'o 5399.3,O.~W. 5440.12W 0.94 v.r 21.76 W 5154.38 W 5195.20 W 5236.02 W 5276.84 W 5317.66 W 202.52 N 204.12 N 205.72 N 207.33 N 208.93 N Local Coordinates Northings Eastings (ft) (ft) Sperry-Sun Drilling Services Proposal Report for Plan: CD2-18 - CD2-18 (wpD3) Revised: 28 August, 2003 5765.97 5794.79 5823.62 5852.45 5881 .28 5621 .82 5650.65 5679.48 5708.31 5737.14 5477.68 5506.51 5535.34 5564.16 5592.99 5713.97 5742.79 5771 .62 5800.45 5829.28 5569.82 5598.65 5627.48 5656.31 5685.14 5425.68 5454.51 5483.34 5512.16 5540.99 272.250 272.250 272.250 272.250 272.250 272.250 272.250 272.250 272.250 272.250 28 August, 2003 - 15:19 54.790 54.790 54.790 54.790 54.790 54.790 54.790 54.790 54.790 54.790 8900.00 8950.00 _ 9000.00 9050.00 9100.00 8650.00 8700.00 8750.00 8800.00 8850.00 ~-.~._ ~,' ""~ ':1-:~;:;;;', 8400.00 . ·->54.790 ~-: ..¿72.250"c 8450.00.~" -~;(79d' ··;'-272.25å 8500.00,,;¡:-:S4.790 ,,':::272.250 8550.00'i:)iÅ 54.790 . 272.250 8600.00';/ 54.790 272.250 54.790 272.250 _ ,528(:53 .!~·,:5333.53 54.790 272.2~º.>:5316.G6·~".."> 5362.36 54.790 272.250"~;:> 'iI539.1å"~'" 5391.19 54.790" 27Ú2.50 ~.,.. SSt¡8.02 5420.02 54.790'~ -- 272:250 5396.85 5448.85 5218.22 5247:95,- . 5268.00, ' ~$r 5074.08 5102.90 5131.73 5160.56 5189.39 4929.93 4958.76 4987.59 5016.42 5045.25 Vertical Depth (ft) 5166.22 5195.05 5216.00 5223.88 5252.,71 - 5022.08 5050.90 5079.73 5108.56 5137.39 4877.93 4906.76 4935.59 4964.42 4993.25 Sub-Sea Depth (ft) 272.250 272.250 272.250 272.250 272.250 272.250 272.250 272.250 272.250 272.250 272.250 272.250 272.250 272.250 272.250 Azim. 54.790 54.790 54.790 54.790 54.790 54.790 54.790 54.790 54.790 54.790 54.790 54.790 54.790 54.790 54.790 Incl. 8150.00 8200.00 8250.00 8300.00 8350.00 ~ ~':3 J 7950.00 8000.00 8036.34 8050.00 8100.00 .... I\~::::) 7700.00 7750.00 7800.00 7850.00 7900.00 7450.00 7500.00 7550.00 7600.00 7650.00 Measured Depth (ft) Alaska North Slope DrillQuest 3.03.02.002 3932.54 3955.35 3979.70 4.006 4.006 4.006 0.000 3911.28 0.000 3914.05 End of Sail: Begin Dir @ 4.0000/100ft 10606.71ft MD, 6750.01ft TVD 3807.95 3828.62 3849.28 3869.95 3890.61 3704.63 3725.29 3745.96 3766.62 3787.29 3601 .30 3621.97 3642.63 3663.30 3683.96 3497.97 3518.64 3539.30 3559.97 3580.63 3394.65 3415.31 3435.98 3456.64 3477.31 3303.31 Albian 96 3311.99 3332.65 3353.32 3373.98 Comment North Slope, Alaska 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 363938.75 E 363897.70 E 363856.51 E 363979.62 E 363974.15 E 364183.56 E 364142.77 E 364101.99 E 364061.20 E 364020.41 E 364387.50 E 364346.71 E 364305.92 E 364265.13 E 364224.35 E 364591 .43 E 364550.65 E 364509.86 E 364469.07 E 364428.28 E 364795.37 E 364754.58 E 364713.79 E 364673.01 E 364632.22 E 364999.31 E 364958.52 E 364917.73 E 364876.94 E 364836.16 E 365179.59 E 365162A5 E ¡ß65121.67 E '~~QP80 .88 E 365'040.09 E 5975050.79 N 5975055.37 N 5975061.61 N 5975047.86 N 5975048.17 N 5975036.35 N 5975038.65 N 5975040.96 N 5975043.26 N 5975045.56 N 5975024.84 N 5975027.14 N 5975029.45 N 5975031.75 N 5975034.05 N 5975013.33 N 5975015.63 N 5975017.94 N 5975020.24 N 5975022.54 N 5975001.82 N 5975004.12 N 5975006.43 N 5975008.73 N 5975011.03 N 5974980.14 N 5974981.10 N 5974983AO N 5974985,71 N 5974988.01 N 5974990.31 N 5974992.61 N "('5974994.91 N 5974997.22 N 5974999.52 N Global Coordinates Northings Easting$, (ft) (ftl Page 8 of 16 7766.99 W 7808.12 W 7849.42 W 7726.08 W 7731.56 W 7521.98 W 7562.80 W 7603.62 W 7644.44 W 7685.26 W 7317.87 W 7358.70 W 7399.52 W 7440.34 W 7481 .16 W 7113.77W 7154.59 W 7195.41 W 7236,23 W 7277.05 W 6909.67 W 6950.49 W 6991,31 W 7032.13 W 7072.95 W /.1.".-' 6705.56 W 6746,38 W 6787.21 W ";;\~i\:~;~~~:~; ~.." 6525.13 W 6542.28 W 6583.10 W 6623,92 W 6664.74 W 305.79 N 309.66 N 315,20 N 303.56 N 303.77 N 295.54 N 297.14N 298.75 N 300.35 N 301.95 N 287,52 N 289.12 N 290.73 N 292.33 N 293.94 N 279.50 N 281 .10 N 282.71 N 284.31 N 285.92 N tt)2 :~'t3.c.QøtN 274':69 N 276.29 N 277.90 N 263.46 N 265.07 N 266.67 N 2ªª?27 N 269188 N 256.37 N 257.05 N 258.65 N 260.25 N 261.86 N Local Coordinates Northings Eastings (ft) (ft) Sperry-Sun Drilling Services Proposal Report for Plan: CD2-18 - CD2-18 (wp03) Revised: 28 August, 2003 677 4.80 6802,96 6830.60 6746.14 6750.01 6602.00 6630.83 6659.66 6688.49 6717.31 6457.86 6486,68 6515.51 6544.34 6573.17 ;6313,71 6342.54 6371.37 6400.20 6429.03 6169,57 6198.40 6227.23 i¡;§?56;~º5 ":~!8Àgf2 6025.42 6054.25 6083.08 6111.91 6140,74 5898.00 5910,11 5938.94 5967.77 5996.60 Vertical Depth (ft) 6722.80 6750.96 6778.60 6694.14 6698.01 6550.00 6578.83 6607.66 6636.49 6665,31 6405.86 6434.68 6463.51 6492.34 6521.17 274.245 276.513 278.743 28 August, 2003 - 15:19 55.366 56.072 56.818 10650.00 .~ 10700.00 10750.00 10600.00 54.790 272.250 10606.71 54.790 272.250 272.250 272.250 272.250 272.250 272.250 54.790 54.790 54.790 54.790 54.790 10350.00 10400.00 10450.00 10500.00 10550.00 10100.00 54.790 272.25Q 10150.00 54.790" 272.250 10200.0q'i 54.790 .272.250 10250.00\;" \ 54.790 . 272,250 10300.00' 54.790 272.250 272.250 6261.71 272'~;~R' .i;~?90;'5~mè' 2~~}~O:;::¡, '¡~~ 9,37" 272';250 ;,)~ 6848.20 272.250 6377.03 6117.57 6146.40 6175.23 6204,05 5973.42 6002.25 6031.08 6059.91 6088.74 5846.00 5858.11 5886.94 5915.77 5944.60 Sub-Sea Depth (ft) 272.250 272.250 272,250 272.250 272.250 272.250 272.250 272.250 272.250 272.250 272.250 272.250 272.250 272.250 272.250 Azim. 54.790 54.790 54.790 54.790 54.790 54.790 54.790 54,790 54.790 54.790 54.790 54.790 54.790 54.790 54.790 54,790 54.790 54,790 54.790 54.790 Incl. 9850.00 9900,00 9950.00 10000.00 10050.00 --~ ~~} _4 ~ -~ ~ ~ 9600.00 9650.00 9700.00 9750.00 9800.00 -;J 9350.00 9400.00 9450.00 9500.00 9550.00 9129.00 9150.00 9200.00 9250.00 9300.00 Measured Depth (ft) Alaska North Slope DrillQuest 3.03.02.002 4655.66 Alpine D 4685.47 4732.21 4732.78 Alpine C 4779.54 Miluveach A 4505.56 4549.37 4593.99 4599.38 4639.38 ~ Continue Dir @ 4.002°/100ft : 11428.44ftMD,7137.59ftTVD LCU- Miluveach 4460.46 4462.62 4379.55 4420.60 4444.38 Kuparuk Fm 4262.73 4269.20 4300.57 4339.52 4350.21 K-1 Marker -' 4123.48 4156.39 4182.06 Base HRZ 4190.60 4226.06 3993.20 HRZ 4005.57 4032.91 4061.71 4091.91 Comment North Slope, Alaska 4.002 4.002 4.002 4.002 4.002 4.002 4.002 4.002 4.002 4.002 4.002 4.002 4.006 4.006 4.006 4.006 4.006 4.006 4.006 4.006 4.006 4.006 4.006 4.006 4.006 363135.97 E 363113.83 E 363080.20 E 363079.79 E 363047.41 E 363256.11 E 363219.47 E 363183.51 E 363179.27 E 363148.29 E 363295.31 E 363293.40 E 363369.71 E 363331.27 E 363309.66 E 363487.86 E 363480.94 E 363448.05 E 363408.65 E 363398.10 E 363650.23 E 363609.27 E 363578.53 E 363568.52 E 363528.03 E 5975451.69 N 5975473.83 N 5975509.11 N 5975509.54 N 5975545.48 N 5975344.62 N 5975375.06 N 5975406.77 N 5975410.64 N 5975439.71 N 5975314.04 N 5975315.49 N 5975261.27 N 5975287.69 N 5975303.33 N 5975190.59 N 5975194.31 N 5975212.69 N 5975236.26 N 5975242.86 N Page 9 of 16 8576.52 W 8599.03 W 8633.27 W 8633.68 W 8666.67 W 8454.56 W 8491.72W 8528.22 W 8532.53 W 8564.00 W 8414.85 W 8416.79 W 8339.56 W 8378.44 W 8400.32 W 8220.22 W 8227.20 W 8260.40 W 8300.20 W 8310.85 W 692.89 N 714.65 N 749.34 N 749.77 N 785.15 N 587.89 N 617.70 N 648.79 N 652.59 N 681.12 N 557.99 N 559.40 N 7208.00 7215.73 7226.87 7227.00 7236.96 7161.00 7176.18 7190.37 7192.00 7203.56 7144.00 7144.85 7156.00 7163.73 7174.87 7175.00 7184.96 7109.00 7124.18 7138.37 7140.00 7151.56 7092.00 7092.85 313.507 314.564 316.187 316.207 317.796 28 August, 2003 - 15:19 75.734 76.518 77.743 77.757 78.976 11667.75 11700.00 11750.00 11750.61 ~ 11800.00 . ." -.~~~<,:~, 11447.46 70.5fQ~·:>'·{'306:~º7;4_. ,. 11450.00."" 70.5?8 396.1~?;", . ;.~~ '~~::" ~j~~:~;f ;-~-:.: 11500.0CL· 'i1;173t{~:<-3Ó7.885 11550.00;:,;">"12;913 >~~309.585 ·-11600.00,,~~!k 74.103 '311.264 ¡'f'V 11605.97~:-' 74.246 311.463 11650.00 75.305 312.923 297.119 6998.37 7050.37 297.445 7002.00 7054.00 298.987 7019.02 7071;oi, :;:". 300.824 7038.81 .4;t7g9Ct81 \:~:1., 301.314 7044.00·- .""'1Ö9~:tÎP - :.' ¡ : ',~' "," ':¡Jl4it 302.631 . i057}3 ;{:-7109~73 304.41@1"",... ~~?075 :75·::::'·' 7127.75 305.41!~('i "\fZQß5.59"'-"'" 7137.59 506.50 N 532.26 N 547.53 N .¢ ,,~'.- <,',' '. .y' ~." ' ,.'~Q56$2 W . _ 59751.17.38 N "'. 8097:SS"W :-;/....5975133.36 N at2S.8CfW:":';;-:; 5975146.44 N ·'·~38.89;'t¡;i' 5975150.90 N 179.70 W 5975169.98 N 5975065.58 N 5975069.50 N 5975q¡S.,04 N 5975090.2,1 N " " ~97g, 02:99 N Global Coordinates Northings Eastin (ft) 7871.32 W 7890.83 W 7932.30 W 7973.79 W 8015.25 W 318.79 N 322.38 N 331.21 N 341.67 N 353.75 N Local Coordinates Northings Eastings (ft) (ft) Sperry-Sun Drilling Services Proposal Report for Plan: CD2-18 - CD2-18 (wp03) Revised: 28 August, 2003 6959.75 6983.55 7001.00 7006.61 7028.89 6845.00 6857.68 6884.17 6910.03 6935.23 Vertical Depth (ft) 6907.75 6931.55 6949.00 6954.61 6976.89 6793.00 6805.68 6832.17 6858.03 6883.23 Sub-Sea Depth (ft) 289.318 291.321 292.806 293.288 295.220 279.908 280.935 283.088 285.203 287.279 Azlm. 68.318 69.438 70.083 65.079 65.260 66.137 67.217 67.512 61.100 62.053 62.791 63.036 64.045 57.229 57.603 58.426 59.284 60.176 Incl. ----~~ 11350.00 - 11400.00 11428.44 ~ 11200.00 11208.65 11250.00 11300.00 11313.48 r::=--., .~~. ~-. 'J - 11000.00 11050.00 11087.68 11100.00 11150.00 10776.46 . 10800.00 10850.00 10900.00 10950.00 Measured Depth (ft) Alaska North Slope DrillQuest 3.03.02.002 Page 10 of 16 28 August, 2003 - 15:19 Sperry-Sun Drilling Services Proposal Report for Plan: CD2-18 - CD2-18 (wp03) Revised: 28 August, 2003 North Slope, Alaska Alaska North Slope Measured Sub-Sea Vertical Local Coordinates Global Coordinates Depth Incl. Azim. Depth Depth Northings Eastings Northings Easting,~& (ft) (ft) (ft) (ft) (ft) (ft) .~.¡) , 11850.00 80.218 319.392 7193.99 7245.99 822.04N 8699,19W 5975582,92N 3630,15.53E;~4.002 4827.40 11900.00 81.468 320.975 7201.95 7253.95 859.95 N 8730.80 W 5975621.37 N 362984.57 E"4.002 4875.74 11950.00 82.724 322.548 7208.82 7260.82 898.85 N 8761.45 W 59752&2:.78 N,,;¡ê62954.59 E 4.002 4924.49 ~ 11961.44 83.012 322.907 7210,24 7262.24 907.88 N 8768.32 W 5~l?ªß6a:¡g3 N -'.$2947.87 E 4.002 4935.70 7" Csg Pt ...Continue Dir @ 4°/1nOft: ';h~ Begin 6-1/8" Hole: 11961 ft MC ì2 TVD 11962.00 83.026 322.924 7210.31 7262.31 908.33 N N 362947.55 E 4,002 4936.25 7" Csg Pt 12000.00 83.985 324.113 7214.61 7266.61 938.68 N .12 N 362925,62 E 4.002 4973.60 12050.00 85.251 325.670 7219.30 7271.30 9È~~41 N 5975742.32 N 362897.69 E 4.002 5023.01 12100.00 86.520 327.221 7222.89 7274.89 1020[96 N 5975784.35 N 362870.85 E 4.002 5072.66 12150.00 87.791 328.768 7225.37 7277.37 1063;31 N 5975827.14 N 362845.11 E 4.002 5122.48 ... 12200.00 89.065 330.313 7226.74 7278.74 1106.39 N 5975870.65 N 362820.51 E 4,002 5172.42 12250.00 90.339 331.856 7227.00 7279.00 1150:16 N 8923.27 W 5975914.82 N 362797.09 E 4.002 5222.41 12250.20 90.344 331.862 7227.00 .,,q7279.00 1150.33 N 8923.37 W 5975915.00 N 362797.00 E 4.002 5222.61 Target, Start Dir (GeoSteer) : 12250 .20ftM D ,7279.00ftTVD Target - CD2-18 (Heel), Current Targe 12300,00 90.344 331.862 "4dZ22QiZO'\i¡¡7278.70 1194.25 N 8946.85 W 5975959.31 N 362774.27 E 0.000 5272.41 12350.00 90.344 331.862 ';¡¡¡M?26?40i?üi;;¡ë·7278.40 1238.34 N 8970.43 W 5976003.79 N 362751.45 E 0.000 5322.41 .. 12400.00 90.344 33.1.862~~6.1Ò" 7278.10 1282.43 N 8994.01 W 5976048.28 N 362728.63 E 0.000 5372.41 12450.00 90.344 331'862 7225.80 7277.80 1326.52 N 9017.59 W 5976092.77 N 362705.81 E 0.000 5422.41 12500.00 90.3"44 331.~4 7225.50 7277.50 1370.61 N 9041.17W 5976137,26 N 362682.99 E 0.000 5472.41 12550.00 ·90.344 331.862 7225.20 7277.20 1414.70N 9064.75W 5976181.74N 362660.16E 0.000 5522.41 12600.00 90:344 331.862 7224.90 7276,90 1458.79 N 9088.33 W 5976226.23 N 362637,34 E 0,000 5572.40 12650.00. 90.344331.862 7224.60 7276.60 1502,88 N 9111,91 W 5976270.72 N 362614.52 E 0.000 5622.40 12700.00'·· 90.344 331.862 7224.30 7276.30 1546.97 N 9135.49 W 5976315.20 N 362591.70 E 0.000 5672.40 12750.00 90.344 331.862 7224.00 7276.00 1591.06 N 9159.07 W 5976359.69 N 362568.88 E 0.000 5722.40 12800.00 90.344 331.862 7223,70 7275.70 1635.15 N 9182.64 W 5976404.18 N 362546,06 E 0.000 5772.40 12850.00 90,344 331.862 7223.40 7275.40 1679.24 N 9206,22 W 5976448.67 N 362523.24 E 0.000 5822.40 12900.00 90.344 331.862 7223.10 7275.10 1723.33 N 9229.80 W 5976493.15 N 362500.42 E 0.000 5872.40 12950.00 90.344 331.862 7222.80 7274,80 1767.42 N 9253.38 W 5976537.64 N 362477.59 E 0.000 5922.40 -·13000.00 90.344 331.862 7222.50 7274.50 1811.51 N 9276.96 W 5976582.13 N 362454.77 E 0.000 5972.40 13050.00 90.344 331.862 7222.20 7274.20 1855.60 N 9300.54 W 5976626.61 N 362431.95 E 0.000 6022.40 13100.00 90.344 331.862 7221.90 7273.90 1899.69 N 9324.12 W 5976671.10 N 362409.13 E 0.000 6072.40 13150.00 90.344 331.862 7221.60 7273.60 1943.78N 9347.70W 5976715.59N 362386.31E 0.000 6122.39 DrillQuest 3.03.02.002 7672.37 7722.37 7772.37 7822.36 7872.36 7422.37 7472.37 7522.37 7572.37 7622.37 -~' 7172.38 7222.37 7272.37 7322.37 7372.37 6922.38 6972.38 7022.38 7072.38 7122.38 6672.38 6722.38 6772.38 6822.38 6872.38 ~ 6422.39 6472.39 6522.39 6572.39 6622.39 6172.39 6222.39 6272.39 6322.39 6372.39 Comment North Slope. Alaska 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 361678.85 E 361656.03 E 361633.21 E 361610.39 E 361587.56 E 361792.96 E 361770.13 E 361747.31 E 361724.49 E 361701.67 E 361907.06 E 361884.24 E 361861.42 E 361838.60 E 361815.78 E 362021.17 E 361998.35 E 361975.53 E 361952.70 E 361929.88 E 362135.27 E 362112.45 E 362089.63 E 362066.81 E 362043.99 E 362249.38 E 362226.56 E 362203.74 E 362180.92 E 362158.10 E 5978094.69 N 5978139.17 N 5978183.66 N 5978228.15 N 5978272.63 N 5977872.25 N 5977916.74 N 5977961.23 N 5978005.71 N 5978050.20 N 5977649.82 N 5977694.30 N 5977738.79 N 5977783.28 N 5977827.76 N 5977427.38 N 5977471.87 N 5977516.35 N 5977560.84 N 5977605.33 N 5977204.95 N 5977249.43 N 5977293.92 N 5977338.41 N 5977382.89 N "')5976982.51 N 5977027.00 N '5977071.48 N 5977115.97 N 5977160.46 N 5976760.07 N 5976804.56 N 5976ª"'{:J",05 N 5QZqß93.54 N 5976938.02, ~ Global Coordinates Northings Eastlng~4 ' (ft) (~)" \~.~, ,,:")'. ":' 362?~,49 ;E 36234:0;67 E 2317"J35 E 95.02 E '2.20 E Page 11 of 16 10078.65 W 10102.23 W 10125.81 W 10149.39 W 10172.97 W 9960.76 W 9984.34 W 10007.92 W 10031.49 W 10055.07 W 9842.86 W 9866.44 W 9890.02 W 9913.60 W 9937.18 W 9724.97 W 9748.54 W 9772.12 W 9795.70 W 9819.28 W· 9607.07 W 9630.65 W 9654.23 W 9677.81 W 9701.39 W .,":, "I,. ; 9489A? W~ 9512:7þ W ß~p6.33W <t:<,9559.91 W 583.49 W 9371.28 W 9394.86 W 9418.44 W 9442.02 W 9465.59 W 3310.57 N 3354.66 N 3398.75 N 3442.84 N 3486.93 N 3090.12 N 3134.21 N 3178.30 N. 3222.39 N 3266.48 N 2869.67 N 2913.76 N 2957.85 N 3001 .94 N 3046.03 N 2649.22 N 2693.31 N 2737.40 N 2781.49 N 2825.58 N f2428.7;7 ,N 2472.86 N " .~5"1è.95 N ,"::,,;,'2561.04 N 2605.13 N .' 2208.32 N 2252.41 N 2296.50 N 234m,59 N 23à1Ì68 N 1987.87 N 2031.96 N 2076.05 N 2120.14 N 2164.23 N Local Coordinates Northings Eastings (ft) (ft) Sperry-Sun Drilling Services Proposal Report for Plan: CD2-18 - CD2-18 (wp03) Revised: 28 August. 2003 7264.30 7264.00 7263.70 7263.40 7263.10 7265.80 7265.50 7265.20 7264.90 7264.60 7267.30 7267.00 7266.70 7266.40 7266.10 7270.30 7270:00 ! 726~~?0:, "<':?269l~0 . ." 7~~i' 268:'80 7268.50 7268.20 7267.90 7267.60 7271.80 7271.50 7271.20 7270.90 7270.60 7273.30 7273.00 7272.70 7272.40 7272.10 Vertical Depth (ft) 7212.30 7212.00 7211.70 7211.40 7211.10 7213.80 7213.50 7213.20 7212.90 7212.60 7215.30 7215.00 7214.70 7214.40 7214.10 7218.30 7218.00 7217.70 7217.40 7217. 7219.80 7219.50 7219.20 7218.90 7218.60 7221.30 7221.00 7220.70 7220.40 7220.10 Sub-Sea Depth (ft) 331 .862 331.862 331.862 331.862 331.862 331.862 331.862 331.862 331.862 331.862 331 .862 331.862 331 .862 331.862 331.862 331 .862 331.862 331.862 331.862 331 .862 331 .862 331.862 331 .862 331 .862 331 .862 Azim. 28 August, 2003 - 15:19 90.344 90.344 90.344 90.344 90.344 90.344 90.344 90.344 90.344 90.344 90.344 90.344 90.344 90.344 90.344 90.344 90.344 90.344 90.344 90.344 90.344 90.344 90.344 90.344 90.344 Incl. 14700.00 14750.00 14800.00 14850.00 14900.00 14450.00 14500.00 14550.00 14600.00 14650.00 13950.00 - 14000.00 14050.00 14100.00 14150.00 13700.00 13750.00 13800.00 13850.00 13900.00 :c_:::~ 90.344 331.862 90.344 331.8:9f~,>, 90.344 331·~852:"':>.:. 90.344 ,"33l~862'\ ': 90.?~~.>';~~'3.31\~~ <:' 7215.60 '<-~~.: . ; -~ -: ~;.~;L, '·~.~I:~ in;t~:,?' 14200.ÖO::-<;:jøo:344~:,~",ß31.862 14250.00-:' ;90;344'" '\ :331.86i 14300.0Q;,:j}9Ô:S44'~:·331.862 14350.00~#f{ 90.344 ,,,.P331.862 14400.00f""· 90.344 331.862 13450.00 13500.00 13550.00 13600.00 13650.00 13200.00 13250.00 13300.00 13350.00 13400.00 Measured Depth (ft) Alaska North Slope Sperry-Sun Drilling Services Proposal Report for Plan: CD2-18 - CD2-18 (wp03) Revised: 28 August, 2003 North Slope, Alaska Alaska North Slope Measured Sub-Sea Vertical Local Coordinates Global Coordinates Depth Incl. Azim. Depth Depth Northings Eastlngs Northings Easting~/- Rãte"'!;! @Section Comment (ft) (ft) (ft) (ft) (ft) (ft) ~ 14950.00 90.344 331.862 7210.80 7262.80 3531.02 N 10196.55 W 5978317.12 N itA 3Õ1§~t7~}g~ '{({.OOO 7922.36 15000.00 90.344 331.862 7210.50 7262.50 3575.11 N 10220.13 W 5978361.61 N36t5~1ff{~2'E' 0.000 7972.36 15050.00 90.344 331.862 7210.20 7262.20 3619.20 N 10243.71 W 5978~ºp,!,10 N ;'f3615i'g':io E 0.000 8022.36 "'15100.00 90.344 331.862 7209.90 7261.90 3663.29N 10267.29W 5~Zª.45&~~I3N~,t496.28E 0.000 8072.36 15150.00 90.344 331.862 7209.60 7261.60 3707.38N 10290.86W59'î849S:Ô2'.,N 361473.46E 0.000 8122.36 15200.00 90.344 331.862 7209.30 7261.30 3751.47N 10314A4W ...9;~~8~9.56N 361450.64E 0.000 8172.36 15250.00 90.344 331.862 7209.00 7261.00 3795.56 N 10338.02 W';;" .,597'8584.04 N 361427.82 E 0.000 8222.36 15300.00 90.344 331.862 7208.70 7260.70 3839.65 N 10361.60W 5978628.53 N 361404.99 E 0.000 8272.36 15350.00 90.344 331.862 7208.40 7260.40 3883.74 N -t0385.18 W' 5978673.02 N 361382.17 E 0.000 8322.36 15400.00 90.344 331.862 7208.10 7260.10 392"1;83 N Yii1Q408.76 W 5978717.51 N 361359.35 E 0.000 8372.35 15450.00 90.344 331.862 7207.80 7259.80 3971.92 N 10432.34 W 5978761.99 N 361336.53 E 0.000 8422.35 15500.00 90.344 331.862 7207.50 7259.50 4016.01 N 10455.92 W 5978806.48 N 361313.71 E 0.000 8472.35 15550.00 90.344 331.862 7207.20 725920 4060.10 N 10479.50 W 5978850.97 N 361290.89 E 0.000 8522.35 15600.00 90.344 331.862 7206.90g7258ÆO '4104.19 N 10503.08 W 5978895.45 N 361268.07 E 0.000 8572.35 15650.00 90.344 331.862 7206.60"'"" 'i7~i~t¡P 4148.28 N 10526.66 W 5978939.94 N 361245.24 E 0.000 8622.35 '~~}j 15700.00 90.344 331.862",J~20q~¡P,;;p:7258.30 4192.37 N 10550.24 W 5978984.43 N 361222.42 E 0.000 8672.35 15750.00 90.344 331.8§2,·rl¡ffi~06;q~[!'ff¡¡¡f,F7258.00 4236.46 N 10573.81 W 5979028.91 N 361199.60 E 0.000 8722.35 15800.00 90.344 331.862?if205.70"· 7257.70 4280.55 N 10597.39 W 5979073.40 N 361176.78 E 0.000 8772.35 ~>¡ 15850.00 90.344 331.862 72Ô5.40 7257.40 4324.64N 10620.97W 5979117.89N 361153.96E 0.000 8822.35 15900.00 90.~A~ 331.862 7205.10 7257.10 4368.73N 10644.55W 5979162.38N 361131.14E 0.000 8872.35 15950.00 .90.344.33'1.862j\ 7204.80 7256.80 4412.82N 10668.13W 5979206.86N 361108.32E 0.000 8922.34 - 16000.00 90.344'331.862 7204.50 7256.50 4456.91 N 10691.71 W 5979251.35 N 361085.50 E 0.000 8972.34 16050.00 90.344 .\331.862 7204.20 7256.20 4501.00 N 10715.29 W 5979295.84 N 361062.67 E 0.000 9022.34 16100.0Q\i;'!i 90.344 . 331.862 7203.90 7255.90 4545.09 N 10738.87 W 5979340.32 N 361039.85 E 0.000 9072.34 16150.00' 90.344 331.862 7203.60 7255.60 4589.18N 10762.45W 5979384.81 N 361017.03E 0.000 9122.34 16200.00 90.344 331.862 7203.30 7255.30 4633.27 N 10786.03 W 5979429.30 N 360994.21 E 0.000 9172.34 16250.00 90.344 331.862 7203.00 7255.00 4677.36 N 10809.61 W 5979473.79 N 360971.39 E 0.000 9222.34 16300.00 90.344 331.862 7202.70 7254.70 4721.45N 10833.19W 5979518.27N 360948.57E 0.000 9272.34 16350.00 90.344 331.862 7202.40 7254.40 4765.54 N 10856.76 W 5979562.76 N 360925.75 E 0.000 9322.34 16400.00 90.344 331.862 7202.10 7254.10 4809.63 N 10880.34 W 5979607.25 N 360902.93 E 0.000 9372.34 16450.00 90.344 331.862 7201.80 7253.80 4853.72 N 10903.92 W 5979651.73 N 360880.10 E 0.000 9422.34 16500.00 90.344 331.862 7201.50 7253.50 4897.81 N 10927.50 W 5979696.22 N 360857.28 E 0.000 9472.33 16550.00 90.344 331.862 7201.20 7253.20 4941.90 N 10951.08 W 5979740.71 N 360834.46 E 0.000 9522.33 16600.00 90.344 331.862 7200.90 7252.90 4985.99N 10974.66W 5979785.19N 360811.64E 0.000 9572.33 16650.00 90.344 331.862 7200.60 7252.60 5030.08 N 10998.24 W 5979829.68 N 360788.82 E 0.000 9622.33 28 August, 2003 - 15:19 Page 12 of 16 DrillQuest 3.03.02.002 Sperry-Sun Drilling Services Proposal Report for Plan: C02-18 - C02-18 (wp03) Revised: 28 August, 2003 Alaska North Slope Measured Sub-Sea Vertical Depth Incl. Azim. Depth Depth (ft) (ft) (ft) 16700.00 90.344 331.862 7200.30 7252.30 16750.00 90.344 331 .862 7200.00 7252.00 _" 16750.39 90.344 331.862 7200.00 7252.00 Local Coordinates Northings Eastings (ft) (ft) Global Coordinates Northings Easting (ft) "Dogle"g Vertical Rate " "",':Section ':e(100ft) 5074.17 N 5118.26 N 5118.60 N 11021.82 W 11045.40 W 11045.58 W All data is in Feet (US Survey) unless otherwise stated. Directions and coordi Vertical depths are relative to 52' Above MSL. Northings and Eastings are rei. to 174 Global Northings and Eastings are relative to NAD27 Alaska State Planes, Zone 4, I,'. . (F---.. ~.dJ J~' :~'~ ~. :" F'..· . . The Dogleg Severity is in Degrees per 100 feet (US Survey). . ...,,' ."" .."} Vertical Section is from 1746' FNL-1542' FEL and calculated~rig':aOAzirputhòf331.862° (True). . ,).>~, '~~1'~, :~ '.~"~,.~.,: ~-~' Magnetic Declination at Surface is 24.525°(30-JUhQ3)F"'~~~~ Based upon Minimum Curvature type calcutåtïonsì at a¡Measur~ Depth of 16750.39ft., The Bottom Hole Displacement is 12t?3~94ft., in the o'¡':ection of 294.863° (True). The Along Hole Displaceme~t is 13764.2Bft, the Planned Tortuosity is 1.179°/1 OOft and the Directional Difficulty Index is 6.3. ~~ Comments Mea~Üred Depth (ft) Station Coordinates TVD Northlngs Eastings ~) ~ ~ Comment 0.00 300.00 2126.33 3044.79 10606.71 0.00 300.00 1860.44 2390.00 6750.01 0.00 N 0.00 N 31.75 N 61.21 N 303.77 N 0.00 E 0.00 E 808.06 W 1557.90 W 7731.56 W SHL (1746' FNL & 1542' FEL, SEC 2 - T11 N - R4E) Begin Dir @3°/100ft (in 12-1/4" Hole): 300ft MD, 300ftTVD End Dir, Start Sail @ 54.790° : 2126.33ftMD, 1860.44ftTVD 9-5/8" Csg Pt... Drill out 8-1/2" Hole: 3048 ft Mo, 2390 ft TVo End of Sail: Begin oir @ 4.0000/100ft: 10606.71ft Mo, 6750.01ft TVo 28 August, 2003 - 15:19 Page 13 of 16 .000 .000 0.000 9672.33 9722.33 9722.72 North Slope, Alaska Comment TO Target: 16750 ftMo,7252.00ftTVC 2796' FNL, 1553' FEL (Sec 33-T11 N- R4E) 61/8" Open Hole _~ Target - C02-18 (Rev Toe) , Current Target -" DrillQuest 3.03.02.002 DrillQuest 3.03.02.002 Page 14 of 16 28 August, 2003 - 15:19 } Formation Tops Formati on Plane Pro fiLe Pene'"fYf'ation Poi n t (Below Well Origin) Measured Vertical Sub-Sea Sub-Sea Dip Up-Dip Depth Depth. "'"fjêþth Northlngs Eastlngs Formation Name (ft) Angle Dirn. (ft) (ft) (ft) (ft) (ft) 1000.00 0.000 359.020 1072.93 ,-1052.00 1000.00 6.06 N 154.16W West Sak 1550.00 0.000 359.020 1732.62 '<'-" 1602.00 1550.00 20.12 N 512.20 W Permafrost 2153.00 0.000 359.020 2723.93 2205.00 2153.00 50.92 N 1295.95 W C-40 2356.00 0.000 359.020 3076.01 2408.00 2356.00 62.21 N 1583.39 W C-30 2732.00 0.000 359.020 3728.14 2784.00 2732.00 83.13 N 2115.80 W C-20 3786.00 0.000 . 359.020 5556.17 3838.00 3786.00 141.77 N 3608.23 W K-3 Marker 3981.00.. 0.000 359.020 5894.38 4033.00 3981.00 152.62 N 3884.35 W Basal K-3 Sand 4007.0Òl'],t' 0.000 "359.020 5939.47 4059.00 4007.00 154.06 N 3921.16 W K-2 Marker 4096.00 0.000 359.020 6093.83 4148.00 4096.00 159.01 N 4047.18 W Base K-2 Cycle 5216.00 0.000 359.020 8036.34 5268.00 5216.00 221.32 N 5633.07 W Albian 97 5846.00 0.000 359.020 9129.00 5898.00 5846.00 256.37 N 6525.13 W Albian 96 6793.00 0.000 359.020 10776.46 6845.00 6793.00 318.79 N 7871.32 W HRZ 6949.00 0.000 359.020 11087.68 7001.00 6949.00 395.25 N 8128.80 W Base HRZ 7002.00 0.000 359.020 11208.65 7054.00 7002.00 441.45 N 8227.20 W K-1 Marker 7044.00 0.000 359.020 11313.48 7096.00 7044.00 488.58 N 8310.85 W Kuparuk Fm Continue Dir @ 4.002°/100ft: 11428.44ftMD,71 7" Csg Pt ...Continue Dir @ 4°/100ft: Begin 6-1/8" Hole: 11961 ft MD, 7262 ft TVD Target, StartDJr (Ge08teer) : 12250.20ftMD,7279.00ftTVD TD Target: 16750 ftMD,7252.00ftTVD; 2796' FNL, 1553' FEL (Sec 33-T11 N-R4E) --- - ~ 8400.32 W 8768.32 W . 8923.37 W 11045.58 W 547.53 N 907.88 N 1150.33 N 5118.60N 7137.59 7262.24 7279.00 7252.00 11428.44 11961.44 12250.20 16750.39 North Slope, Alaska Comment Station Coordinates TVD Northings Eastings (ft) (ft) (ft) Measured Depth (ft) Comments (Continued) Alaska North Slope Sperry-Sun Drilling Services Proposal Report for Plan: CD2-18 - CD2-18 (wp03) Revised: 28 August, 2003 Alaska North Slope Formation Tol's (Continued) Formati on Plane (Below Well Origin) Sub-Sea Dip Up-Dip (ft) Angle Dim. 7092.00 7140.00 7156.00 7175.00 0.000 359.020 0.000 359.020 0.000 359.020 0.000 359.020 CasinQ details "C->C~ '"""-~"7 Sperry-Sun Drilling Services Proposal Report for Plan: CD2-18 - C02-18 (wp03) Revised: 28 August, 2003 Profile Measured Vertical Depth Depth (ft) (ft) 11447.46 11605.97 11667.75 11750.61 7144.00 7192.00 7208.00 7227.00 From Measured Vertical Depth Depth (ft) (ft) ,¡tA M~"'p':;,ed T;~.j,,&I¡f:! .:fJ _~_-_c--:__ " ~. <Surface> <Surface> 1 <Surface> ",øu'3044.79 """2390.00 <Surface> 11962.00 7262.31 7262.31 <Run-TD> <Run-TO> 28 August, 2003 - 15:19 North Slope, Alaska Penetration Point Sub-Sea Depth Northings (ft) (ft) Casing Detail 95/8" Csg Pt 7" Csg Pt 6 1/8" Open Hole CU- Miluveach Miluveach A Alpine 0 Alpine C ~ ~ Page 15 of 16 DrillQuest 3.03.02.002 DríllQuest 3.03.02.002 Page 16 of 16 Targe TVD Noi'ttHnas Eastinas Target Target Shape Type N 8923.37 W Polygon Current Target Mean Sea Level/Global Coordinates: 7227',00 5975915.00 N 362797.00 E Geographical. COordinates: 70020' 31.1974" N 151006'48.6736" W Point#J 7279.00 1010.41 N 8975.98 W #2 7279.00 1113.82 N 8777.72 W #3 7279.00 5170.31 N 10946.45 W #4 7279.00 5066.90 N 11144.71 W Mean Sea LeveVGlobal Coordinates #1 7227.00 5975776.00 N 362742.00 E #2 7227.00 5975876.00 N 362942.00 E #3 7227.00 5979969.00 N 360843.00 E #4 7227.00 5979869.00 N 360643.00 E Geographical Coordinates #1 700 20' 29.8206" N 151006' 50.2058" W #2 70020' 30.8400" N 151006' 44.4173" W #3 70021' 10.7100" N 151007' 47.9496" W #4 700 21' 09.6901" N 15P 07' 53.7404" W 7252.00 5118.60 N 11045.58 W Point Current Target Mean Sea Level/Global Coordinates: 7200.00 5979919.00 N 360743.00 E Geographical Coordinates: 70021'10.2001" N 1510 07' 50.8450" W North Slope, Alaska Sperry-Sun Drilling Services Proposal Report for Plan: CD2-18 - CD2-18 (wp03) RevIsed: 28 August, 2003 28 August, 2003 - 15:19 CD2-18 CD2-18 (Heel) Target Name Targets associated with this weJ/øath Alaska North Slope WELLPATH DETAIlS CD2·18 Rig: . Doyon 19 Ref. Do.tDm: 57 MSL 52.00ft V.S<etion Origin Origin SW1Ín ! ~ +NI-5 +FJ-W FromTVD 331.854' 0.00 0.00 36.10 COMPmYDET AIlS COMro~ AlLsb Inc. Fngineerlng ~.,. Cù:uktionMcdlod: MinimumC""",_ Enor Syslmt ISCWSA S_~ TnvCymIcrNoI1h Eøor Surúœ: Elip1icoI + easq Wunmg Mdhod: Ruks Based ANTI-COLLISION SETTINGS Interpolation Method:MD IntervaJ: 50.00 Depth Range From: 36.10 To: 1675L95 MaximlmRange: 1871.58 Reference: Plan: C02-1 8 (wp02) Sb. NlA WElL DETAIlS NoI1lång Enœ.g La6tnde Longitude 5914612.15 371699.38 7002UI9.935N l51'OZ27.976W SURVEY PROGRAM Depth Fm Depth To SurveylPlan 36.10 1000.00 Planned: CD2-18 (wp02) V7 1000.00 16751.95 Planned: CD2-18 (wp02) V7 +EJ·W 3.64 +NI·S ·29.45 Nuœ Pàn: COO· MD '---' To ? -'10.7 -20.0 -15.0 -10.0 -5.0 -0 27C- -5.0 -10.0 -15.0 -20.0 -'10.7 [deg] vs Centre to Centre Separation [10ft/in] VSec Target OJXI OJXI 409.12 3914.62 5224.51 C02-18 (Heel) m4.52 C02-18 (Toe) 18ð SECTION DEf AILS +NI-S +FJ-W DLeg TFace 0.00 0.00 0.00 0.000 0.00 0.00 0.00 0.000 31.71 -808.02 3.00 0.000 303.45 -m1.4O 0.00 0.000 1150.40 -8925.10 4.00 71.028 5119.01 -11046.48 0.00 89.824 -105 -100 -25 '(~.'., ~~~ ;r °j-O 270 '\ '"-25 - ~.~ -- '-50 -75 -100 -105 -75 -50 TVD 36.10 300.00 1860.41 6750.17 7279.00 7252.00 MD IDe A2i 36" 10 0.000 0.000 300.00 0.000 0.000 2126.28 54.788 272.248 10606.66 54.788 27U48 12251.85 90.344 331.862 16751.95 90.344 331.885 See I 2 3 4 5 6 Travelling Cylinder Azimuth (fFO+AZI) CD2-18 (wp03) ---Approved Pfall --- [deg] vs Centre to Centre Separation [50ft/in] Azimuth (TFO+AZI Travelling Cylinder ,¡il:I' I I, \ )II " .., ... .. .," SPERRY SUN Anticollision Report CQlUpány: Fi~ld: . Reference Site: Reference ·WeU: Réference Wellpath: ConocöPhiUips Alaska lI1c. Colville. Ri\ÎerUnit Alpine CD2 Plan:·CD2-18 CD2:"18 Date: 8/28/2003 T~W¢:< ..14:33:33 Page: 1 Co-ordinate(NE). 'ßete["~J1C¢: Vertical (TVD) Reference: ."" ,., .,..,.. ",. WeU:...PI~:.(;p2:1a;T~ue. N0r111 52'M$L52.Q Db:>. Oracle Plan: CD2-18 (wp02) & NOT PLANNED P::¡:)GR. ISCWSA Ellipse T rav Cylinder North Ellipse + Casing GLOBAL SCAN APPLIED: All wellpaths within 200'+ 100/1000 of reference Interpolation Method: MD Interval: 50.00 ft Depth Range: 36.10 to 16751.95 ft Maximum Radius: 1871.58 ft Reference: Error Model: Scan Method: Error Surface: Casing Points MD TVD Diameter. Hoh; Size Name ft ft In.. iil 3044.76 2390.00 9.625 12.250 95/8" 11962.00 7262.17 7.000 8.bOO 7" 16739.15 7252.08 6.125 6J25 Open Hole -"-- -------.-- Plan: CD2-18 (wp02) Date Composed: 8/26/2002 Version: 7 Principal: Yes Tied-to: From Well Ref. Point Summary <~~~-~-~~-----~-------- Offs~t WeUpatb --..:-------~7~~-~~~-~> . Reference Offset . Cti'~Ctr No~Go Allowable Site Well .. Wellpath MO. MD DistaDce .Åren . . Deviation Warning .. ft ft ft ft· .. . ..ft Alpine CD2 CD2-08 CD2-08 V8 249.58 250.00 100.91 5.13 95.78 Pass: Major Risk Alpine CD2 CD2-12 CD2-12 V7 299.76 300.00 60.16 5.72 54.44 Pass: Major Risk Alpine CD2 CD2-13 CD2-13 V1 249.48 250.00 50.73 5.06 45.67 Pass: Major Risk Alpine CD2 CD2-13 CD2-13PB1 V10 249.48 250.00 50.73 5.06 45.67 Pass: Major Risk Alpine CD2 CD2-13 CD2-13PB2 V4 249.48 250.00 50.73 5.06 45.67 Pass: Major Risk Alpine CD2 CD2-14 CD2-14 V1 449.08 450.00 39.49 7.24 32.24 Pass: Major Risk Alpine CD2 CD2-15 CD2-15 V3 549.55 550.00 30.42 9.70 20.72 Pass: Major Risk Alpine CO2 CD2-15 C02-15PB1 V1 549.55 550.00 30.42 9.70 20.72 Pass: Major Risk Alpine CO2 CD2-15 C02-15PB2 V2 549.55 550.00 30.42 9.70 20.72 Pass: Major Risk Alpine CO2 CD2-16 C02-16 (Rig Surveys) V 399.78 400.00 21.11 7.00 14.11 Pass: Major Risk Alpine CO2 CD2-16 CD2-16 V7 399.28 400.00 21.11 6.88 14.22 Pass: Major Risk Alpine CO2 CD2-17 C02-17 VO 399.44 400.00 11.54 6.93 4.61 Pass: Major Risk Alpine CD2 CD2-19 C02-19 V8 299.75 300.00 10.45 5.01 5.45 Pass: Major Risk Alpine CO2 CD2-20 C02-20 V4 448.96 450.00 18.12 7.59 10.52 Pass: Major Risk Alpine CO2 CD2-22 C02-22 V1 349.40 350.00 40.84 5.76 35.08 Pass: Major Risk Alpine CO2 CD2-23 CD2-23 V2 698.07 700.00 47.39 11.36 36.03 Pass: Major Risk Alpine CD2 CD2-23 CD2-23PB1 V12 698.07 700.00 47.39 11.47 35.92 Pass: Major Risk Alpine CD2 CD2-24 CD2-24 VO 497.74 500.00 62.10 8.27 53.83 Pass: Major Risk Alpine CO2 C02-24 C02-24PB1 V1 497.74 500.00 62.10 8.27 53.83 Pass: Major Risk Alpine CO2 CD2-25 CD2-25 V1 398.57 400.00 70.54 6.96 63.58 Pass: Major Risk Alpine CO2 CD2-26 C02-26 V4 496.66 500.00 74.25 8.09 66.17 Pass: Major Risk Alpine CD2 C02-26 C02-26PB1 V2 300.00 300.00 81 .40 5.32 76.07 Pass: Major Risk Alpine CO2 CD2-26 C02-26PB2 V3 300.00 300.00 81.31 5.32 75.99 Pass: Major Risk Alpine CO2 CD2-28 C02-28 V3 544.78 550.00 99.01 9.92 89.09 Pass: Major Risk Alpine CO2 CD2-28 CD2-28PB1 V13 544.78 550.00 99.01 10.03 88.98 Pass: Major Risk Alpine CO2 CD2-29 C02-29 V1 447.53 450.00 110.13 7.46 102.67 Pass: Major Risk Alpine CO2 C02-32 C02-32 PB1 VO 447.11 450.00 141.52 7.54 133.98 Pass: Major Risk Alpine CO2 CD2-32 C02-32 VO 447.11 450.00 141.52 7.43 134.09 Pass: Major Risk Alpine CO2 CD2-33 C02-33 V2 398.60 400.00 151.24 6.44 144.80 Pass: Major Risk Alpine CO2 CD2-33 C02-33A V1 398.60 400.00 151.24 6.40 144.85 Pass: Major Risk Alpine CO2 CD2-33 CD2-34B V1 398.60 400.00 151.24 6.44 144.80 Pass: Major Risk Alpine CO2 C02-34 CD2-34 V3 446.02 450_00 154.38 8.01 146.37 Pass: Major Risk Alpine CD2 CD2-34 C02-34PB1 V2 446.02 450.00 154.38 8.12 146.26 Pass: Major Risk Alpine CD2 CD2-35 CD2-35 V1 362.40 350.00 171.84 6.21 165.62 Pass: Major Risk Alpine CD2 CD2-35 CD2-35A V1 348.59 350.00 171.66 5.91 165.75 Pass: Major Risk Alpine CD2 CD2-36 CD2-36 PB1 V5 299.73 300.00 180.12 5.42 174.71 Pass: Major Risk Alpine CD2 CD2-36 CD2-36 V5 299.73 300.00 180.12 5.42 174.71 Pass: Major Risk Alpine CO2 CD2-37 CD2-37 V16 398.07 400.00 191.90 7.69 184.20 Pass: Major Risk Alpine CO2 C02-38 C'D2-38 V5 348.65 350.00 201.32 6.10 195.22 Pass: Major Risk Alpine CD2 CD2-39 C02-39 V1 249.99 250.00 211 .11 4.23 206.87 Pass: Major Risk Alpine CD2 C02-39 CD2-39PB1 VO 249.09 250.00 211.09 4.22 206.87 Pass: Major Risk Alpine CD2 CD2-40 Plan: CD2-40 V5 Plan: 447.08 450.00 221.62 7.17 214.45 Pass: Major Risk Alpine CD2 C02-40 Rig: CD2-40 PB1 V6 447.08 450.00 221.62 7.31 214.32 Pass: Major Risk Alpine CD2 CD2-40 Rig: CD2-40 V1 0 447.08 450.00 221 .62 7.31 214.32 Pass: Major Risk Alpine CO2 CD2-41 CD2-41 V9 494.66 500.00 232.95 8.81 224.14 Pass: Major Risk Alpine CO2 CD2-42 CD2-42 VO 397.91 400.00 241 .23 6.52 234.70 Pass: Major Risk ) . ·~~:~ailY: ....) .... :. ... · ~~te~~J1¢eSlt~:. ......... . . .. ::i:~~:ê:;:Ukat..: . ,,,"" ..",,,,, ",'" "..",'" " . . .... . .. . . .. . . ., . .òonöcòPhmips:Alêk~lnc,:· .... ·..ColviJleHiver Unit· .. .: .. idp,neCQ2:.. :..... . pla:n;Ç02~.1$ .. ç[)~:ta · Swmnary <------.....----------- Offset Wel1patb ----------------------> Site Well Wellpatb Alpine C02 Alpine C02 Alpine C02 Alpine C02 Alpine C02 Alpine C02 Alpine C02 Alpine C02 Alpine C02 Alpine C02 Alpine C02 Alpine C02 C02-42 Plan: CD2-06 Plan: CD2-07 Plan: CD2-10 Plan: CD2-30 Plan: CD2-31 Plan: CD2-31 Plan: CD2-43 Plan: CD2-43 Plan: CD2-43 Plan: CD2-54 Prelim: CD2-05 SPERRY SUN Anticollision Report ) .", .."""". ' ." " "..' '" , . ".... . .. ...... . .. I)ate= <8/2812ÒO$..····: ..... ·.TiJU~:< ·14:33:33·.. : J?~e: .. .' . . ... . ... .. . .. .,. . . ...'.. .... .... . .' . . . . .. ... .. . .. . . . ,., ... . . ... '" . .' .. . ...... . . .. . . " ... . . . .. ....... " .. .. .. . . .. . . ....., . ". . . . .. ",". .... ".. .. . ...... .....", . "' .... .. .",".. ......... .. ... . . . ... .. .. . .... ... ....... .... . ... . ... ... . . ... .. ... .... . ..... ... ..... . .. .. .. .....", . "' ."......" .., . ".,..... . ...... "' . . . ... '. ...... . . .. . . ..... .. .. . . . . ,.. ... ..... . :. ··:·:¢~~:ø~~:~(~~i~~r~~~~.~~~:\ :.·:::/W~.O~·:p~~h·::::C;þ~~:1·è.~::t·r9~·:NW~·:.:: ..... . ··:·y~~µ:~~r(1Y1?).:·~ê.(~t~~¢~.~~::}:: >·.::,5?~: :M$~·:$=~t;.Q: .:-::.,<:. .... :..' .: :::''':'::''-: '.::.': :.... . ......:< ... Db: .Or~¢le Reference l"ID ft CD2-42PB1 VO 397.91 Plan: CD2-06 V2 Plan: 249.99 CD2-07 (wp01) VO Plan: 249.99 Plan: CD2-10 VO Plan: 599.54 Plan: CD2-30 V4 Plan: 11373.85 PLAN: CD2-31 (GR Harz) 448.08 Plan: CD2-31 (ST Core) 448.08 CD2-43 Lat1 (wp01IA") 397.93 CD2-43 BHL05 (wp01) V2 397.93 CD2-43 Pilot (wp01) V2 397.93 CD2-54 VO Plan: A 15 ( 2358.65 CD2-05 V3 36.10 Site: Alpine CD2 Well: CD2-08 Well path: CD2-08 V8 :,::~rfer~~CtW::::¡@()~~¢tTVD . · .'\.fj) >: .... ...... .......11:..¡ <. .. .'. ·...··<ft· <.. .:..:....... ft 36.10 36.10 36.50 36.50 49.60 49.60 50.00 50.00 99.60 99.60 100.00 100.00 149.60 149.60 150.00 150.00 199.60 199.60 200.00 200.00 249.58 299.52 349.68 399.58 449.08 498.06 546.52 594.37 641 .49 687.86 733.46 778.22 822.02 864.49 905.37 944.30 981.11 1015.60 1047.90 1078.32 1107.40 1135.72 1162.97 1188.94 1213.54 1236.72 1258.67 1279.51 1300.00 1318.64 1336.88 249.58 299.52 349.67 399.53 448.92 497.70 545.84 593.20 639.67 685.20 729.75 773.24 815.55 856.30 895.28 932.15 966.76 998.98 1028.93 1056.95 1083.57 1109.31 1133.90 1157.19 1179.10 1199.61 1218.92 1237.13 1254.93 1271.03 1286.69 250.00 300.00 350.00 400.00 450.00 500.00 550.00 600.00 650.00 700.00 750.00 800.00 850.00 900.00 950.00 1000.00 1050.00 1100.00 1150.00 1200.00 1250.00 1300.00 1350.00 1400.00 1450.00 1500.00 1550.00 1600.00 1650.00 1700.00 1750.00 249.98 299.92 349.80 399.63 449.39 Offset l\-ID ft 400.00 250.00 250.00 600.00 15704.19 450.00 450.00 400.00 400.00 400.00 2650.00 36.10 Ctr-Ctr No-Go Distance Are~ ft ft 241.23 6.52 120.42 5.29 110.53 4.75 79.64 12.08 307.64 251.47 131.17 9.17 131.17 9.17 250.87 7.92 250.87 7.92 250.87 7.92 321 .96 58.01 129.76 Rule Assigned: Inter-Site Error: ~emi-Major Axis Ctr-Ctr No-Go Ref Offset TFO+AZI TFO-HS CasingIHIDistance Are~ ft ft deg deg in ft ft 0.00 0.00 352.89 352.89 9.625 99.88 0.91 · 0.02 0.02 352.89 352.89 9.625 99.88 1.13 0.07 0.09 352.89 352.89 9.625 99.88 1.96 0.19 0.19 352.93 352.93 9.625 99.91 3.00 0.30 0.29 353.07 353.07 9.625 100.08 4.06 0.41 0.53 0.59 0.65 0.70 499.08 0.74 548.74 0.81 598.36 0.89 647.93 0.99 697.48 .. 1.08 747.01 796.51 845.95 895.19 944.12 992.52 1040.21 1086.90 1132.58 1177.37 1221.74 1266.15 1310.36 1354.17 1397.49 1440.26 1482.56 1524.44 1566.07 1607.45 1648.35 0.39 353.67 353.67 0.51 354.73 354.73 0.62 356.51 84.26 0.66 359.17 86.92 0.68 2.70 90.45 0.70 6.94 94.69 0.72 11.55 99.31 0.75 16.44 104.19 0.78 21.49 109.24 0.81 26.50 114.25 1.19 1.31 1.43 1.56 1.68 0.84 0.87 0.91 0.96 1.01 31.34 119.09 35.92 123.67 40.20 127.95 44.21 131.96 47.85 135.61 1.75 1.81 1.85 1.86 1.87 1.06 1.11 1.17 1.22 1.28 51.07 138.82 53.72 141.47 55.67 143.42 57.06 144.81 58.03 145.78 1.89 1.91 1.93 1.96 1.98 1.31 1.34 1.39 1.45 1.56 58.77 146.52 59.42 147.17 59.98 147.73 60.45 148.20 60.86 148.61 61.21 148.96 61.51 149.26 61.76 149.51 61.98 149.73 62.15 149.91 62.27 150.02 2.02 2.05 2.08 2.11 2.14 1.68 1.81 1.94 2.08 2.21 2.18 2.34 9.625 9.625 9.625 9.625 9.625 9.625 9.625 9.625 9.625 9.625 9.625 9.625 9.625 9.625 9.625 9.625 9.625 9.625 9.625 9.625 9.625 9.625 9.625 9.625 9.625 9.625 9.625 9.625 9.625 9.625 9.625 -/ , ~\' 100.91 102.46 104.66 107.31 110.65 114.96 120.10 126.36 134.11 143.35 154.07 166.47 180.74 197.63 217.46 240.70 267.45 297.80 331.00 366.23 402.60 439.37 476.89 515.34 554.80 595.27 636.55 678.53 720.98 763.87 807.29 9.19 9.91 10.64 11.41 12.19 12.98 13.77 14.56 15.36 16.12 16.75 17.36 17.90 18.35 18.77 19.10 19.42 19.73 20.04 20.38 20.72 21.04 21.34 21.63 21.89 22.17 Allowable De"iation ft 234.70 115.13 105.78 67.56 56.18 122.00 122.00 242.95 242.95 242.95 263.95 W8I'ning Pass: Major Risk Pass: Major Risk Pass: Major Risk Pass: Major Risk Pass: Major Risk Pass: Major Risk Pass: Major Risk Pass: Major Risk Pass: Major Risk Pass: Major Risk Pass: Major Risk No Offset Stations Major Risk 0.00 ft Allowable Deviation Warning ft 98.97 Pass 98.75 Pass 97.92 Pass 96.91 Pass 96.02 Pass 5.13 95.78 Pass 6.21 96.25 Pass 7.17 97.50 Pass 7.93 99.38 Pass 8.55 102.10 Pass 105.77 110.19 115.73 122.70 131.16 141.09 152.70 166.18 182.28 201.34 223.95 250.09 279.91 312.65 347.46 383.51 419.95 457.16 495.30 534.42 574.55 615.51 657.19 699.36 741.98 785.12 Pass Pass Pass Pass Pass Pass Pass Pass Pass Pass Pass Pass Pass Pass Pass Pass Pass Pass Pass Pass Pass Pass Pass Pass Pass Pass Sperry-Sun Drilling Services Local Proposal Data - Plan: C02-18 - C02-18 (wp03) MD Delta Inclin. . Azimuth TVD NortQings E~stir1~ Dogleg , Toolface (ft) MD (ft) CO)' , e) (ft) (~) .. ' (ft), eJ100ft) : e).: 1 0.00 0.000 0.000 o.oo! 0.00 0.00 2 300.00 300.00 0.000 0.000 300.00 0.00 0.00 0.000 0.000 3 2126.33 1826.33 54.790 272.250 1860.44 31..75.N' : 808.06 W 3.000 272.250 -- 4 10606.71 8480.38 54.790 272.250 6750.01 303;77 N ' 7731.56W 0.000 0.000 5' 11428.44 821 .73 70.083 305.412 7137.59' 547.53 N 8400:34 w 4.006 '71.161 6T' 12250.20 821.76 90.344 331.862 7279.00 1150.33 N 8923.37 W' 4.002, 55.108 I 7T 16750.39! 4500.181 90.3441 331.8621 7252.00: 5118.60N 11045.58 w! 0.0001' O~OOO - ~=~.~. \~-",..",J '.&-'~;=r- '--' 28 August, 2003 - 15:10 - 1 - DrillQuest ; i MD Delta ! (ft) ¡ MD (ft) i---. 1 O.OOi I 2 300.001 1~~__2126.33¡ 4 10606.71 J 5' 11428.44 6T' 12250.20 I-rr- 16750.39; 300.00 1826.33 8480.38 821.73 821.76 4500.18! 28 August, 2003 - 15:11 Inclin. (0) 0.000 0.000 54.790 54.790 70.083 90.344 90.344j Azimuth (0) 0.0001 0.0001 273.2301 273.2301 306.392 332.843 332.843 i TVD (ft) -52.00: 248.001 1808.44 6698.01 7085.59 7227.00 7200.00 . Sperry-Sun Drilling Services Global Proposal Data - Plan: CD2-18 - CD2-18 (wp03) Nörthings Eastings . (ft) (ft) 5974612.15 N 371699.38 E 5974612.15 N 371699.38 E 5974657.72 N 370891.98 E 5975048.17 N 363974.15E 5975303.33 N 363309.66 E 5975915.00 N 362797.00 E 5979919.00 N I 360743.00 E I , I Dogleg ¡ -Toolface i (0/100ft) .. . (O) ! . ~-- ....-". -- -. --- 0.000 0.000 --"- --_.-- -"- -¥ - 3.000 273.230 ---~-_._-. 0.000, 0.000 4.006 71.161 4.002 55.108! O.OOOr O.OOOi - 1 - DrillQuest ,.::::.¡ Conversion ConI plete 70 deg 20 min 31.197 see 151 deg 6 min 48.674 see Meridian: U TIIN R4E Section 3 600.21FNL 4679.79FSL 5185.03FEL 94.96FWL UTM Zone 5 X=570821.227204 Y =7804936.740630 70.34199927 151.11352044 Conversion '.Results .For: Heel Target ASP Zone 4: 362797 5975915 Conversion COlnplete 70 deg 20 min 19.935 see 151 deg 2 min 27.976 see Meridian: U TIIN R4E Section 2 1745.67FNL 3534.33FSL 1541.99FEL 3738.00FWL UTM Zone 5 , X=573550.253455 Y=7804673.925380 70.33887092 151.04110457 (:onversion :RcsuitsFor: Surface Location ASP Zone 4: 371699.385974612.15 CD2-18 ) ) Conversion, Complete 70 deg 21 min 1.531 see 151 deg 7 min 37.036 see Meridian: U T12N R4E Section 33 2796.27FNL 2483.73FSL 1553.41FEL 3726.57FVVL UTM Zone 5 X=570288.102420 Y=7805860.486795 70.35042529 151.12695453 Conversion l~.t~sul.ts .For: Toe Target ASP Zone 4: 3611995979029 REV DA 1£ BY CK APP ) DESCRIPllON ') REV DATE BY CK APP DESCRIPllON o 5/29/01 G.D. J.Z. C.A. PER A01004ACS 4 5/15/03 G.D. J.Z. C.A. PER K03074ACS ALL CONDUCTORS ARE LOCATED IN PROTRACTED SEC.2, T 11 N, R 4 E, U.M. SEC.LlNE c5/s PLAN 'X' LAT.(N) LONG.(W) FNL FEL GND PAD WELL CD2-1 CD2-2 CD2-3 CD2-4 CD2-5 CD2-6 CD2- 7 CD2-8 CD2-9 CD2-10 CD2-11 CD2-12 CD2-13 CD2-14 CD2-15 CD2-16 CD2-17 CD2-18 CD2-19 CD2-20 CD2- 21 CD2-22 * CD2-23 CD2-24 CD2-25 CD2-26 CD2-27 CD2-28 CD2-29 CD2-30 CD2-31 CD2-32 CD2-33 CD2-34 * CD2-35 CD2-36 CD2-37 CD2-38 * CD2-39 CD2-40 CD2-41 CD2-42 CD2-43 CD2-44 CD2-45 CD2-46 CD2-47 CD2-48 CD2-49 CD2-50 CD2-51 CD2-52 CD2-53 CD2-54 CD2-55 CD2-56 CD2-57 CD2-58 CD2-59 CD2-60 'y' 5.974.741.17 5.974.731.13 5.974.721.46 5.974.711.45 5.974.701.48 5.974.691.64 5.974.681.62 5.974.671.61 5.974.661.90 5.974.652.12 5.974.641.66 5.974.631.95 5.974.622.10 5.974.612.15 5.974.602.64 5.974.592.18 5.974.582.28 5.974.572.39 5.974.562.21 5.974.552.30 5.974.542.33 5.974.532.34 5.974.522.31 5.974.512.60 5.974.502.63 5.974.492.75 5.974.482.74 5.974.472.57 5.974.463.34 5.974.452.65 5.974.442.90 5.974.433.20 5.974.423.05 5.974.413.52 5.974.403.28 5.974.393.27 5.974.383.33 5.974.373.69 5.974.363.45 5.974.353.42 5.974.344.11 5.974.333.52 5.974.323.53 5.974.313.77 5.974.303.80 5.974.293.84 5.974.283.88 5.974.274.18 5.974.264.07 5.974.254.19 5.974.244.05 5.974.234.27 5.974.224.26 5.974.214.18 371.685.60 371.686.73 371.688.17 371.688.72 371.690.14 371.691.07 371.692.02 371.69t~.98 371.694.26 371.695.50 371.696.24 371.697.39 371.698.48 371.699.38 371.700.50 371.701.77 371.702.51 371.704.15 371.704.52 371.705.92 371.706.81 371.707.80 371.709.10 371.709.87 371.711:.26 371.712.00 371.713.04 371.714.18 371.715.28 371.716.13 371.717.49 371.718,,42 371.719.40 371.720.66 371.72&..83 371.722.68 371.723.84 371.724.77 371.725.60 371.726.94 371.728.07 371.729.06 371.730.13 371.73".19 371.732.05 371.733.00 371.734.28 371.73e'.18 371.736.31 371.737.50 371.738.44 371.739.42 371.740.55 371.741.60 70· 20' 21.202" 70· 20' 21.103" 70· ?O· ,?1.008" 70·?0' ,?O. 910" 70· 20' 20.812" 70· 20' 20.716" 70·?0' .?0.617" 70· ?O' ?0.519" 70· 20' 20.424" 70· ?0'?0.328" 70· 20' 20.225" 70· 20' 20.130" 70· 20' 20.033" 70·?O' 19.935" 70· ?O' 19.842" 70· 20' 19.739" 70· 20' 19.642" 70· 20' 19.545" 70· 20' 19.445" 70· 20' 19.348" 70· 20' 19.250" 70· 20' 19.152" 70· 20' 19.053" 70· 20' 18.958" 70· 20' 18.860" 70· 20' 18.763" 70· 20' 18.665" 70· 20' 18.565" 70· 20' 18.475" 70· 20' 18.370" 70· 20' 18.274" 70· 20' 18.179" 70· 20' 18.079" 70· 20' 17.986" 70· 20' 17.885" 70·?O' 17.787" 70· 20' 17.689" 70· 20' 17.595" 70· 20' 17.494" 70· 20' 17.396" 70· 20' 17.304" 70· 20' 17.200" 70· 20' 17.102" 70· 20' 17.006" 70· 20' 16.908" 70· 20' 16.811" 70· 20' 16.713" 70· 20' 16.618" 70· 20' 16.518" 70· 20' 16.421" 70· 20' 16.322" 70· 20' 16.226" 70· 20' 16.128" 70· 20' 16.029" 151· 02' 28.443" 151· 02' 28.406" 151· 02' 28.359" 151· 02' 28.337" 151· 02' 28.291" 151· 02' 28.259" 151· 02' 28.226" 151· 02' 28.193" 151· 02' 28.151" 151· 02' 28.110" 151· 02' 28.083" 151· 02' 28.044" 151· 02' 28.008" 151· 02' 27.976" 151· 02' 27.939" 151· 02' 27.897" 151· 02' 27.870" 151· 02' 27.817" 151· 02' 27.801" 151· 02' 27.756" 151· 02' 27.725" 151· 02' 27.691" 151· 02' 27.648" 151· 02' 27.620" 151· 02' 27.575" 151· 02' 27.548" 151· 02' 27.513" 151· 02' 27.474" 151· 02' 27.438" 151· 02' 27.407" 151· 02' 27.363" 151· 02' 27.331" 151· 02' 27.297" 151· 02' 27.256" 151· 02' 27.216" 151· 02' 27.187" 151· 02' 27.148" 151· 02' 27.116" 151· 02' 27.087" 151· 02' 27.042" 151· 02' 27.005" 151· 02' 26.971" 151· 02' 26.934" 151· 02' 26.898" 151· 02' 26.868" 151· 02' 26.836" 151· 02' 26.793" 151· 02' 26.762" 151· 02' 26.724" 151· 02' 26.684" 151· 02' 26.652" 151· 02' 26.618" 151· 02' 26.580" 151· 02' 26.544" 1617' 1627' 1636' 1646' 1656) 1666' 1676' 1686' 1696' 1706' 1716' 1726' 1736' 1746' 1755' 1765' 1775' 1785' 1795' 1805' 1815' 1825' 1835' 1844' 1855' 1865' 1875' 1885' 1894' 1905' 1915' 1924' 1934' 1944' 1954' 1964' 1974' 1984' 1994' 2004' 2013' 2024' 2034' 2043' 2053' 2063' 2073' 2083' 2093' 2103' 2113' 2123' 2133' 2143' NOTES: 1. COORDINATES SHOWN HEREON ARE ALASKA STATE PLANE. ZONE 4. NAD 27. 2. ELEVATIONS SHOWN ARE BRITISH PETROLEUM MEAN SEA LEVEL (B.P.M.S.l.) 3. * INDICATES DATA PER LOUNSBURY AS-BUILT. ALPINE ConocóP'hillips Alaska, Inc. DRAWING NO: CADD FILE NO. 01-02-05-1 05-27-01 1558' 1556 · 1555' 1554' 1552' 1551' 1550' 1549' 1548' 1546' 1545' 1544' 1543' 1542' 1541' 1539' 1538' 1536' 1536' 1534' 1533' 1532' 1531' 1530' 1528' 1527' 1526' 1525' 1523' 1522' 1521' 1520' 1519' 1517' 1516' 1515' 1514' 1513' 1512' 1510' 1509' 1508' 1506' 1505' 1504' 1503' 1502' 1501' 1499' 1498' 1497' 1496' 1494' 1493' MODULE: CD20 ALPINE PROJECT CD- 2 WELL CONDUCTORS AS-BUILT LOCATIONS CE -CD2Q-121 . PART: 2 OF 3 I': ./ 8.7 8.7 8.7 8.7 8.7 8.7 8.7 8.7 8.7 8.7 8.7 8.7 8.7 8.7 8.7 8.7 8.7 8.7 8.7 8.7 8.7 8.7 8.7 8.8 8.8 8.8 8.8 8.8 8.8 8.8 8.8 8.7 8.7 8.7 8.7 8.7 8.7 8.7 8.7 8.6 8.6 8.6 8.6 8.6 8.5 8.5 8.5 8.5 8.5 8.5 8.5 8.5 8.5 8.5 15.9 15.9 15.9 15.9 15.9 15.9 15.9 15.9 15.9 15.9 15.9 15.9 15.9 15.9 15.9 15.9 15.9 15.9 15.9 15.9 15.9 15.9 15.9 15.9 15.9 15.9 15.9 15.9 15.9 15.9 15.9 15.9 15.9 15.9 15.9 15.9 15.9 15.9 15.9 15.9 15.9 15.9 15.9 15.9 15.9 15.9 15.9 15.9 15.9 15.9 15.9 15.9 15.9 15.9 UNIT: CD REV: 4 ConocoPhillips Alaska, Inc ) Post Office Box 100360 Anchorage, Alaska 99510-0360 Telephone 907-276-1215 ) ConocdPhillips August 29, 2003 Alaska Oil and Gas Conservation Commission 333 West ih Avenue, Suite 100 Anchorage, Alaska 99501 Re: Application for Permit to Drill CD2-18 Dear Sir or Madam: ,f ConocoPhillips Alaska, Inc. hereby applies for a Permit to Drill an onshore injectionwell from the Alpine CD2 drilling pad. The intended spud date for this well is September 15, 2003. It is intended that Doyon Rig 19 be used to drill the well. CD2-18 will be drilled to penetrate the Alpine reservoir horizontally. After setting 7'1 intermediate casing, the horizontal section will be drilled and the well completed as an open hole injector. At the end of the work program, the well will be closed in awaiting completion of well work and facilities work that will allow the well to begin injection." . v Note that it is planned to drill the surface hole without a diverter. There have been 38 wells drilled on CD1 pad and 38 surface holes drilled on CD2 pad with no significant indication of gas or shallow gas hydrates. All of the wells on CD2 have surface casing shoes within a 2000' radius of the planned surface casing shoe of CD2-18. It is also requested that the packer placement requirement be relaxed to place the completion packer ..." 200ft TVD above the Alpine formation. This will place the completion at a maximum inclination less than 65° and allow access to the completion with standard wireline tools for future intervention. Please find attached the information required by 20 ACC 25.005 (a) and (c) for your review. Pertinent information attached to this application includes the following: 1. Form 1 0-401 APPLICATION FOR Permit to Drill per 20 ACC 25.005 (a). 2. Fee of $100 payable to the State of Alaska per 20 ACC 25.005 (c) (1). 3. A proposed drilling program, including a request for approval of annular pumping operations. 4. A drilling fluids program summary. 5. Proposed completion diagram. 6. Proposed completion diagram with open hole isolation options. 7. Pressure information as required by 20 ACC 25.035 (d)(2). 8. Directional drilling / collision avoidance information as required by 20 ACC 25.050 (b). Information pertinent to the application that is presently on file at the AOGCC is: 1. Diagrams of the BOP equipment, diverter equipment and choke manifold layout as required by 20 ACC 25.035 (a) and (b). 2. A description of the drilling fluids handling system. 3. Diagram of riser setÜp which replaces diverter. o ,1 W , ~I .i \:, '. If you have any quesf ) or require further information, pleas ):,ntact Zane Kuenzler at 265-1308 or Chip Alvord at 265-6120. Sincerely, . -~~~ Zane Kuenzler "/~ (Õ) Drilling Engineer Attachments cc: CD2-20 Well File / Sharon Allsup Drake Chip Alvord Vern Johnson Cliff Crabtree Steve Moothart Nancy Lambert Lanston Chin e-mail: ATO 1530 A TO 868 ATO 802 ATO 848 ATO 844 Anadarko - Houston Kuukpik Corporation Tommy_Thompson @ anadarko.com "'~f';_:<C"'-_ 1 ---. I ~- ~ ' f '--1IT" -·4, "\. ~ N . "~'-'--,-..." i , '" y~,-, ...,~_. . C) f" -~ . . ,...-...... ~ . ,,,.,., -....N:....:'~":''1':'"'L...'''''''''''·_· .~ ;"M.cI'..,...",~,_,~ .. . ........_.....:.,~"'I!"õ""oor~..-_ ... 1 J 3 , ; j ".-........ ·II",~. x/·__. '-...-......M..'.II:;.'.~_ L.... ~':.. "";¡;,.,...I:"'""'f'(""-...o ¡ i N.. !i,N IJ ¡< i -$- N CliUQ .3 9- I 1 .".........~ . ~M:.".,\ " _ ,._...-..:>¡. ,,-.I~- I - ""'~ ¡ -- . ---:::] 1 0,000 -- /- S. K.ALLSUP-DRAKE CONOCOPHILLlPS 711 G STREET - AT01530 ANCHORAGE AK 99501 1056 DATE jf'LJs12>1/~14I311 ~~~~~~~E s-rA,&OP 4L1lSrA!fJrce¡CL I $ rco.Oo <--' tÅe ~ ck.·~",-f ¡=Ø!roa .-----¡)OlLARS (ð =::- ~~... .. ·.·0·· ·····.·H· A·.· S·E· chaseManhattanBanku.SA.N.A. VaJidUPTo.5000Dollars M~' . apz-Ø ~'."h<""~"'_'~"'""""__~ ~. 1)~ 1:0 en 1001,10101: 2 1aUUUOlt 27 25711° 1.05 b f-J ) . TRANSMJT AL LETTER CHECK'LIST CIRCLE APPROPRIATE LETTER/PARAGRAPHS TO BE INCLUDED IN TRANSMITTAL LETTER WELL NAME (2RIL (!])¿-/8 PTD# 1-03 -IS-¡ CHECK WHAT APPLIES ADD-ONS (OPTIONS) M1JL TI LATERAL (If API num ber last two (2) digits are between 60-69) paOT (PH) "CLUE" The permit is for a new wellboresegment of existing well . Permit No, API No. Production. should continue to be reported as a function' of the original API number. stated above. BOLE In accordance with 20 AAC 25.005(1), all records, data and logs acquired for the pilot hole must be clearly differentiated . in both name (name on permit plus PH) and API Dum ber (50 70/80) from records, data and logs acquired for well (name on permit). SPACING EXCEPTION DRY DITCH SAMPLE Rev: 07/10/02 Ojody\templates The permit is approved subject ,to fuD compliance with 20 AAC 25.055. Approval to perforate and produce is contingent upon issuance of a conservation order approving a spacing exception. (Companv Name) assumes the liability of any protest to the spacing . exception that may occur. All dry ditch sample sets submitted to the Commission must be in no greater than 30' sample intervals from below the permafrost or from where samples are first caught and 10' sample intervals through target zones. ::~:~-,+þ"p~~~,~.~rçfi~'~,~J4:!$1Ej Field & Pool COLVILLE RIVER. AL~~~~!~-=-_~~~.~~~____ Well Name: _CO!.VILLEB1\LU~lL__C_D2:18 Program _S..ER ____.___ Well bore seg PTD#:2031510 Company _C_Qti.OJ~_QPHI!-.LJ£S...ðlJ~$MJJ":J_C_______.___n___________._____. Initial Classrrype ___S_~J3Le.E!~~J.P_GeoArea _8iLL Unit _5..0_3..6..0 On/Off Shore P..n Annular Disposal Administration 11 Permit fee attached Yes . . _ . . . . . . . _ _ _ . _ _ _ _ _ . . . . _ . _ . . _ . . . . . .. ...... b .Leé3s~_nurnb~rappropriat.e. - - . . . . - - . . -Y~$ _ . SlJr1'ac~ in ADL _380075. Top peod inte.rva! in ADL .387207, TD. io ASRC NRPA fe.e.lease..Propos~d 13 Untque well. n_am~ _and oumb_er . Y~s . w~lI.cpurse Ije.s witbio th~ .boun_ds of. tb~ CoIYill.e.Ri\(er Unit. _ 4 W~IIJocat~din.a.d"efined.pool_. Y~s . _........... _.. ......._ 5 WeJllocat.ed prpp~r _distance. from driJling unit.b.oundary Y~s 6 W~IUocat~d prpp~r .dtstance. from Qtbe.r w~lIs. . _ _ _ y~s _ 17 .S.utficientacr~age.aYailable in.drilJiog unit. . . _ . . _ _ . Y~s _ _ 8 Jf_d~viat~d. is.wellbore plaUnclu.ded _ _ _ Y~$ . 9 Qp~r:ator only é3ffected party _ . . . . . _ . . . _ . . Y ~s _... _ . _ . _ . . . _ . . _ . . . . 10 Qp~r:ator bas.apprppri.ate.Qond in.force. . . . _ . . . . . _ _ . . _ _ _ . Y~s . _ _ . . . _ . . . . _ . 11 P~rmit. can be tssu.ed witbout co.nsEHva.tion ord~r. . . " " Y~$ _ . . . . . . . _ 12 P~rm.it_caQ be tssueçlwitboutad.fT!il1i~tr:.ati\(e.apprpvaJ. . _ . _ . . . _ . . _ Y~s _ . . . . . . . _ . . _ . . . . _ . . . _ . . _ _ _ _ . _ . . _ . . 9/3/2003 13 .c_aQ permit.be apprQv~d b~for~ .15-day_ wajt. . . . " . . . . . _ . .. _.. Y~s _...... _ . . . . . _ _ . . . _ _ . _ . . . . . . . . . . . . . . . . . . . . _ _ . . . .. .... _ . 14 .We.IUQcat~d wtthin areé3 and.strataauthorized. byJQjectipn Ord~r # (put.lO# ¡n.cpr:nm~Qt$).(For. Yes.. .... AIO.l8. . . _ . . . . _ . . . . . . . . . . . . . . . . . . . . . . . _ . . _ . _ . 15 _All w~lIs.within.1l4.l1Jite_are.a.of(eyi~w jd~otifi~d (Fpr:.servic~welJ Ol1ly). . . . . . . . . . . . . . _ Y~$ . . _ . . . . CRU CD2-30 . _ . . . _ . . . . . . _ _ . . . . _ . . . . . . . . . . . . . . . . . . . . . 16 Pre.-produ.ced inj~ctor; .duration_of pr~--pro.duction I~$s. thé3n. 3 rnonths. (For _s~r:vi.ce well. onJy) . . No. . . . . . _ . _ . . . _ . _ _ . _ _ . _ . . . _ _ _ _ . _ . . _ _ _ . . _ . . _ _ _ . . _ . _ . . . . . . _ _ . _ .. _ . . _ . 17 .A.cMP.F.inding_ofCQn.si.st.eQçy_has b~enJssued.for.tbi$ pr.piect. . . . . . . . . . . . . NA. . . . . . . _ . . . . . . . . . . _ _ . _ . . . . . _ . _ . _ . . . . . . Appr SFD Date o o - - - - - ~ . - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - . . - - - - - - - - - - - - - - - - - - - - - - - . . . - . - . - - - - - - l .\ Engineering ---..-----------.----.------. . . ~ - - - - - - Appr Date TEM 9/3/2003 ~~.; Geology Appr Date SFD 9/3/2003 Geologic Commissioner: 18 .C.oQdu.ct.or strin.g_PJQvi.d~d _ _ _ . . . . _ _ _ _ _ _ _ _ _ .. _ _ _ . . _ . . . . . _ . . . . _ _ . . _ _ _ _ .Y~s . _ . . . _ _ . _ . . . . _ . . _ . _ . . . .. _ . . _ _ . . . . . . . . . . . . . . . . . _ . . . . . . . . . _ . . . . . _ . . . . . _ . . 19 .S.udé3c~.casing_p.rotec_ts_aILknown.USQWs.. _ _ . . . . _ . . . . . . . . . . . . _ . . . . NA. . . _ . . _ . No aquifers..p~r:.AI0.18Açonctu$iQn 3.. . _ _ _ . . _ . _ . . . _ . _ _ . . . . . . . _ . . _ _ _ . . 20 .CMT. vpL é3d~qu.ate.to circ.ulate_on .cQl1d.uctor. & SUJf.CSg . . _ . _ . . . . . _ . . . . _ _ . _ . _ _ . _ Y~$ _ . _ _ . . . _ _ . _ _ _ , . _ . _ _ . _ . . _ . _ _ . . . . . _ . . . . . . . . . . _ . _ _ _ . . . . _ . . _ _ _ _ _ . . . 21 .CMT. vpL ad~qu.ate.to tie.-in .long .string to_surj csg_ _ _ . . . . _ . . . . . _ _ _ . _ _ _ _ . . _ _ . _ _ No. . . . . . . . Al1n_ular di~p_o$al !Jltirnat~ly plaol1.ed._ _ . .. _ _ . . . _ . . . . _ . . . _ . . . . . . . . . . . _ _ . _ .. 22 .CMT.wil! GOYer.aHklJo.wn.pro_d!Jçtiy~ bQri¡Qn.s. _ . . . _ _ . . _ . _ . . . No. . . . . . . . Ope_n.hpLe.completlon pLaQl1ed.. .. . . . . _ . . _ . . . .. . . . . . . . _ . . . . _ _ . . . _ . _ . _ _ . _ _ . 23 .G.asiQg de_signs ad.equat~ fpr:. C.T. B _&_ p_ermafrpst. " . _ . . . . . . . . _ . . _ . . . . . _ . .Y~s . . . . . . _ _ _ _ . _ . . . . _ . . _ . . . _ _ _ . _ _ _ . . _ . . _. _.. _ _ . _ _ _ . . _ _ . . . . . . . . . . . . . _ 24 _Adequ¡:3t.e.tan.kage_orre_serye pit _ . _ . _ _ . _ _ _ . _ _ . _ . _ _ _ . . . . . _ . . _ . _ _ . _ . _ . . Y~s _ _ . . .. _ _ R.ig .js_e_qµippe_dwith st~el.pits.. NOJ~$e.rve.pjt-pl_anlJe.d, Wa.st.e.tQ approved. é3nnµI!J~ or_disposal w~lI, . " _ . . . _ _ 25 Jf.a. r~-dr:.ilt l:1é3s.a_ 1.0:403 for¡:¡ba.nçlonment be~o apPJQv~d . _ . . . . . . . . _ _ . . _ . _ _ .. NA_ .. _ _ . _ . . .. . . . _ . " _ . _ . _ . . _ . . . . . . _ . . . . . _ _ _ _ . . 26 .Adequat.ewellbore. separ¡;¡tjon _proposed. . . . .. _ . . . . . . . . . . . . . . . . . . Y~s _ . _ . _ _ _ I?rpximi.ty- anç¡IY$i~ P~.rfprm.e_d._ Jrayeling cy-lioder patb calcul.ate.d. Gyr:.O$ PQs.si.bLe,. _ . _ 27 Jf.djv~r:t~rJ~q!JiJ~d,dQesjtJl1e~t.r~guJa.tiOl1s_ _ _ _ _ _ _. _ _.. _.. _.... _ _ _ _ _ _ _. _ _ _ NA _ _ _ _ _. .Piy~rt.erWé3iyeJI:1é3s_b.e~l1giYe.n.fQr.CD_-2pad,.. _.... _. _ _.... _ _ _ _ _. _ _ _ _ _ _ _. _ _ _.. _....._ 28 .Dritliog fluid_program sG.h~matic.& e.q.uipJist.adequale. . . . . . . _ . _ _ . _ _ _ _ _ _ _ . .Y~$ _ .. . . . _ . Maximum exp~cted. fpr:.mation pressur~_8.7_EMW._ MW plann~d 9.6:- 9.8 In 8-1/2"_h.ote, 9.3 in_res.ervpir.. _ _ . 29 .B.DP.Es,.dpthey Jll.e~t. reguJa.tiol') _ _ _ _ . . . _ _ .. .. . . . . _ . . . . . _ . . _ . . _ . . Y~s . .. . _ . . _ .. . _ _ _ .. _ . . . . _ . . .. . . . _ . . _ . . . . _ . . . _ _ _ . _ . _ _ _ . _ _ . _ _. .. _ . . _ _ . __ . . _ . . 30 )_B.DP.E_pr~s$ratiogappropriate.;.t~stto_(pu.tp~igin_comr:nent$...... _ _ _.. _. _ _ _ _ _ _ _ _ Y~s . _MASl?ca.lcu!ate_d.at2556psi.. 350_0_p.si.a.ppr:pprjate.. .PPCp.usuaJlyt~$Ì$to_5.oPQpsJ._ _. _ _. _ _... _ _.. _ __ 31 .C.hoKe. manifold cQnJpJies. w/ API. RP.-53. (May 84). . . .. . . . . . _ _ . . _ . . ._ _ . . . _ Y ~s . . . _ . _ _ . _ _ _ _ _ _ _ _ _ . _ . . _ . _ _ _ _ _ . _ . . _ _ _ _ _ _ _ _ _ . _ _ _ _ _ _ . _ _ _ . _ . _ .. . _ _ . . .. . . . . _ 32 .Work wi.I.1 oçC.ur without.oper¡:¡tion .sbutdown.. _ . . . .. .. . _ .. _ . . . . . . . . . . . _ . _ . _ . _ . _ Y~s . . . _ . . _ _ _ _ _ . ._ . _ .. _ _ _ _ . . . _ . _ _ . _ _ _ . . . .. . . . _ . _ _ _ _ _ . _ _ _ _ . . . _ . . . . _ .. _ _ _ _ . _ 33 .Is presence_ Qf H2S gas_ prQb_abl~ _ _ __ _ . _ _ . _ . _ _ _ . _ _ . . . _ _ . . . . . . . _ .. No. _ . .. _ The.toe. (TD) of w~1J CP2-3Q i.s w.itbio j/~ mile otthe inlende_d_path _of CP2-j 8. .This.is withJn. the Alpine. _ .. . . . . 34 MeçhanlœLcPlJdJti.onpt we.lIs wLth.in AOR yerified. (For_s_e(Vic~ well on.lY-). _ . . . . . . . . . . . . .Y~$ . . _ _ _ . _ r.ese.rvoJr, No w~lIs_p_eQetr:.ate.tbe. tpp of.tb~ AlpiQe (eservoir_witl:1in.1£4.m.il~_of C02-18's planned. en.try.. " _ _ . . . _ 35 P~rmit. c.aQ .be lssueçl w/o hYdr.ogen. s_utfide meas.ur:.es _ _ _ _ . . . . . . . _ .. .. _ . _ _ . _ _ _ Y ~s _ . . _ . _ . . . . . _ _ . _ . . _ _ .. _ _ _ _ .. . . . __ . _ _ _ . . . .. _ . . _ . . _ _ . _ . _ _ _ . . _ . _ . _ _ . . . .. . . . 36 .D.ata.pr~s~lJtedonpote_ntialoyeJpres.sur~_zones_ _.. _ _.. _.......... _. _. _.. _ _. .Y~s_... _ _ .E;xpeçtedJ~$~rvojr_pre.ssu.r~i.s_8,7_p-pg~MW.wlll_b~_drilteçlwitb 9.P:-9.3ppg mud.. _.. _ _ _ _ _.. _ _... _.. 37 .S~Lsmic_analysJs_ of shallow gas_z.oo~.S_ _ _ . . _ _ . . . . _ _ . _ . . . . . . NA. . . . _ _ . _ _ . _ _ _ . _ _ . __ _ . . _ _ _ .. . . _ . _ _ _ . . _ _ _ _ _ . _ _ . . . . . _ . _ . _ _ _ _ _ . . . _ . . . . 38 .S~abeçl.cç>l1ditipo survey.(if Off-shp(e) _ _ . . . . . _ . .. .. _ . . _ . . _ . . _ . . _ _ _ . . . . . _ . . NA . . . _ _ _ . . _ . _ _ _ _ _ _ _ _ _ _ _ _ _ . _ . _ _ _ _ . . .. . _ _ _ _ _ _ _ _ _ _ _ . . . . . . . . . _ _ . _ _ _ _ . . . . . .. . . . .. . . _ _ 39 . Contact namelphQne.for.we~kly progress.reports [explQratpry .only]. . . _ _ . _ .. _ _ _ _ . _ _ _ _ _NA _ _ _ _ _ . _ _ _ . . . _ _ . . _ . . _ _ . . _ . _ . . . _ . _ . _ _ _ _ . _ . _ _ _ _ _ _ _ _ . _ .. _ _ _ _ . _ _ _ _ _ _ _ _ _ _ _ _. _ .. . _ _ _ Date: ~~~i:~~~~r: Date co:~~~~one~ 1 A ~ ~ ~ ( ) -\ J Well History File APPENDIX Information of detailed nature that is not particularly germane to the Well Permitting Process but is part of the history file. To improve the readability of the Well History file and to sinlplify finding infomìation. infomlalion of this nature is accumulated at the end of the file under APPEN.DIX. No special effort has been made to chronologically organize this category of information. Sperry-Sun Drl~)ing Services LIS Scan Utility ) 903-IS \ ~"... $Revision: 3 $ LisLib $Revision: 4 $ Mon Oct 06 14:12:02 2003 ').-?--~3 Reel Header Service name............ .LISTPE Date. . . . . . . . . . . . . . . . . . . . .03/10/06 Origin. . . . . . . . . . . . . . . . . . . STS Reel Name............... . UNKNOWN Continuation Number..... .01 Previous Reel Name...... . UNKNOWN Comments................ .STS LIS Writing Library. Scientific Technical Services Tape Header Service name............ .LISTPE Date. . . . . . . . . . . . . . . . . . . . . 03/10/06 Origin. . . . . . . . . . . . . . . . . . . STS Tape Name............... . UNKNOWN Continuation Number..... .01 Previous Tape Name...... . UNKNOWN Comments................ .STS LIS Writing Library. Scientific Technical Services Physical EOF Comment Record TAPE HEADER Colville River Unit (Alpine) MWD/MAD LOGS # WELL NAME: API NUMBER: OPERATOR: LOGGING COMPANY: TAPE CREATION DATE: # JOB DATA CD2-18 501032046600 ConocoPhillips Alaska, Inc. Sperry-Sun Drilling Services 03-0CT-03 JOB NUMBER: LOGGING ENGINEER: OPERATOR WITNESS: MWD RUN 3 MW0002649344 M. HANIK D. MICKEY MWD RUN 4 MW0002649344 M. HANIK D. MICKEY # SURFACE LOCATION SECTION: TOWNSHIP: RANGE: FNL: FSL: FEL: FWL: ELEVATION (FT FROM KELLY BUSHING: DERRICK FLOOR: GROUND LEVEL: 2 11 4 E 1746 1542 MSL 0) 52.25 15.90 # WELL CASING RECORD :;' '~: ¡t···: ,i!"""i\ 1:"'''''' ~ ',~ J,. ~.:.:_: ~iî<I~' '",,:":~' :,",-~" K I,"""" " 'à i ¡p""! P.' .~~ '\~. It:t:"-,~~ ,...,:¿..:,:~"( t.;:-...·.¡¡ ~ LC ~:;o:Il't r.......-:r.!f~ï 1ST STRING 2ND STRING 3RD STRING PRODUCTION STRING OPEN HOLE CASING DRILLERS BIT SIZE (IN) SIZE (IN) DEPTH (FT) 8.500 9.625 3221.0 6.125 7.000 12112.0 OCT 1 0 20G~) J::. CGf"¡:;i,,;:::Cmìm¡~ì~km /\m::fKìH!\1g e # 'R~~\\\~ .II' ,< REMARKS: ') ) 1. ALL DEPTHS ARE BIT DEPTHS UNLESS OTHERWISE NOTED. THESE DEPTHS ARE MEASURED DEPTH (MD). 2. ALL VERTICAL DEPTHS ARE TRUE VERTICAL DEPTH (TVD). 3. MWD RUNS 1 AND 2 WERE DIRECTIONAL ONLY AND ARE NOT PRESENTED. 4. MWD RUNS 3 AND 4 COMPRISED DIRECTIONAL WITH DUAL GAMMA RAY (DGR) UTILIZING GEIGER-MUELLER TUBE DETECTORS AND ELECTROMAGNETIC WAVE RESISTIVITY PHASE-4 (EWR4). 5. DEPTH SHIFTING/CORRECTION OF MWD DATA WAS WAIVED PER MEG KREMER (CPAI) DISCUSSION OF REQUIREMENTS 9/26/01. MWD DATA ARE CONSIDERED PDC. 6. MWD RUNS 3 AND 4 REPRESENT WELL CD2-18 WITH API#: 50-103-20466-00. THIS WELL REACHED A TOTAL DEPTH (TD) OF 18019'MD/7215'TVD. SROP SMOOTHED RATE OF PENETRATION WHILE DRILLING. SGRC SMOOTHED GAMMA RAY COMBINED. SEXP SMOOTHED PHASE SHIFT-DERIVED RESISTIVITY (EXTRA SHALLOW SPACING) . SESP = SMOOTHED PHASE SHIFT-DERIVED RESISTIVITY (SHALLOW SPACING) . SEMP = SMOOTHED PHASE SHIFT-DERIVED RESISTIVITY (MEDIUM SPACING) . SEDP = SMOOTHED PHASE SHIFT-DERIVED RESISTIVITY (DEEP SPACING) . SFXE = SMOOTHED FORMATION EXPOSURE TIME. SLIDE = NON-ROTATED INTERVALS REFLECTING BIT DEPTHS. $ File Header Service name............ .STSLIB.001 Service Sub Level Name... Version Number.......... .1.0.0 Date of Generation...... .03/10/06 Maximum Physical Record. .65535 File Type. . . . . . . . . . . . . . . . LO Previous File Name...... .STSLIB.OOO Comment Record FILE HEADER FILE NUMBER: EDITED MERGED MWD Depth shifted DEPTH INCREMENT: # FILE SUMMARY PBU TOOL CODE GR FET RPD RPM RPS RPX ROP $ 1 and clipped curves; all bit runs merged. .5000 START DEPTH 3199.5 3210.5 3210.5 3210.5 3210.5 3210.5 3233.5 STOP DEPTH 17961.0 17968.5 17968.5 17968.5 17968.5 17968.5 18018.5 # BASELINE CURVE FOR SHIFTS: CURVE SHIFT DATA (MEASURED Ú~)TH) ) --------- EQUIVALENT UNSHIFTED DEPTH --------- BASELINE DEPTH $ # MERGED DATA SOURCE PBU TOOL CODE MWD MWD $ BIT RUN NO 3 4 MERGE TOP 3199.5 12124.0 MERGE BASE 12124.0 18018.5 # REMARKS: MERGED MAIN PASS. $ # Data Format Specification Record Data Record Type................ ..0 Data Specification Block Type... ..0 Logging Direction... ............. . Down Optical log depth units.......... .Feet Data Reference Point............. .Undefined Frame Spacing............. ....... .60 .1IN Max frames per record..... ....... .Undefined Absent value.. . . . . . . . . . . . . . . . . . . . . -999 Depth Units. . . . . . . . . . . . . . . . . . . . . . . Datum Specification Block sub-type...O Name Service Order Units Size Nsam Rep Code Offset Channel DEPT FT 4 1 68 0 1 ROP MWD FT/H 4 1 68 4 2 GR MWD API 4 1 68 8 3 RPX MWD OHMM 4 1 68 12 4 RPS MWD OHMM 4 1 68 16 5 RPM MWD OHMM 4 1 68 20 6 RPD MWD OHMM 4 1 68 24 7 FET MWD HOUR 4 1 68 28 8 First Last Name Service Unit Min Max Mean Nsam Reading Reading DEPT FT 3199.5 18018.5 10609 29639 3199.5 18018.5 ROP MWD FT/H 0.12 565.93 154.467 29571 3233.5 18018.5 GR MWD API 1.74 420.75 94.0839 29524 3199.5 17961 RPX MWD OHMM 0.23 1830.45 11.275 29517 3210.5 17968.5 RPS MWD OHMM 0.15 1923.14 12.272 29517 3210.5 17968.5 RPM MWD OHMM 0.19 2000 13.9328 29517 3210.5 17968.5 RPD MWD OHMM 0.13 2000 16.1391 29517 3210.5 17968.5 FET MWD HOUR 0.14 65.67 0.983915 29517 3210.5 17968.5 First Reading For Entire File......... .3199.5 Last Reading For Entire File...... .... .18018.5 File Trailer Service name............ .STSLIB.001 Service Sub Level Name... Version Number.......... .1.0.0 Date of Generation..... ..03/10/06 Maximum Physical Record. .65535 File Type............... .LO Next File Name......... ..STSLIB.002 Physical EOF File Header } service name............ .ulSLIB.002 Service Sub Level Name... Version Number.......... .1.0.0 Date of Generation...... .03/10/06 Maximum Physical Record. .65535 File Type. . . . . . . . . . . . . . . . LO Previous File Name...... .STSLIB.001 Comment Record FILE HEADER FILE NUMBER: RAW MWD Curves and log BIT RUN NUMBER: DEPTH INCREMENT: # FILE SUMMARY VENDOR TOOL CODE GR RPX FET RPD RPS RPM ROP $ 2 ) header data for each bit run in separate files. 3 .5000 START DEPTH 3199.5 3210.5 3210.5 3210.5 3210.5 3210.5 3233.5 STOP DEPTH 12090.0 12082.5 12082.5 12082.5 12082.5 12082.5 12124.0 # LOG HEADER DATA DATE LOGGED: SOFTWARE SURFACE SOFTWARE VERSION: DOWNHOLE SOFTWARE VERSION: DATA TYPE (MEMORY OR REAL-TIME) : TD DRILLER (FT): TOP LOG INTERVAL (FT): BOTTOM LOG INTERVAL (FT): BIT ROTATING SPEED (RPM): HOLE INCLINATION (DEG MINIMUM ANGLE: MAXIMUM ANGLE: # TOOL STRING (TOP TO VENDOR TOOL CODE DGR EWR4 $ BOTTOM) TOOL TYPE DUAL GAMMA RAY ELECTROMAG. RESIS. 4 # BOREHOLE AND CASING DATA OPEN HOLE BIT SIZE (IN): DRILLER'S CASING DEPTH (FT): # BOREHOLE CONDITIONS MUD TYPE: MUD DENSITY (LB/G): MUD VISCOSITY (S): MUD PH: MUD CHLORIDES (PPM): FLUID LOSS (C3): RESISTIVITY (OHMM) AT TEMPERATURE (DEGF) MUD AT MEASURED TEMPERATURE (MT): MUD AT MAX CIRCULATING TERMPERATURE: MUD FILTRATE AT MT: MUD CAKE AT MT: # NEUTRON TOOL MATRIX: MATRIX DENSITY: HOLE CORRECTION (IN): 13-SEP-03 Insite 66.37 Memory 12124.0 3233.0 12124.0 49.4 82.7 TOOL NUMBER 132477 136749 8.500 3221.0 LSND 9.60 44.0 8.9 400 5.0 2.300 1.100 2.000 2.700 68.0 149.0 68.0 68.0 # ') ) TOOL STANDOFF (IN): EWR FREQUENCY (HZ): # REMARKS: $ # Data Format Specification Record Data Record Type..................O Data Specification Block Type.....O Logging Direction. . . . . . . . . . . . . . . . . Down Optical log depth units.......... .Feet Data Reference Point............. . Undefined Frame Spacing.................... .60 .1IN Max frames per record............ .Undefined Absent value. . . . . . . . . . . . . . . . . . . . . . -999 Depth Units. . . . . . . . . . . . . . . . . . . . . . . Datum Specification Block sub-type...O Name Service Order Units Size Nsam Rep Code Offset Channel DEPT FT 4 1 68 0 1 ROP MWD030 FT/H 4 1 68 4 2 GR MWD030 API 4 1 68 8 3 RPX MWD030 OHMM 4 1 68 12 4 RPS MWD030 OHMM 4 1 68 16 5 RPM MWD030 OHMM 4 1 68 20 6 RPD MWD030 OHMM 4 1 68 24 7 FET MWD030 HOUR 4 1 68 28 8 First Last Name Service Unit Min Max Mean Nsam Reading Reading DEPT FT 3199.5 12124 7661.75 17850 3199.5 12124 ROP MWD030 FT/H 1.92 457.07 197.966 17782 3233.5 12124 GR MWD030 API 1.74 420.75 117.71 17782 3199.5 12090 RPX MWD030 OHMM 0.8 661.08 5.32876 17745 3210.5 12082.5 RPS MWD030 OHMM 0.15 661.74 5.47112 17745 3210.5 12082.5 RPM MWD030 OHMM 0.19 146.63 5.68404 17745 3210.5 12082.5 RPD MWD030 OHMM 0.13 2000 7.5264 17745 3210.5 12082.5 FET MWD030 HOUR 0.14 61.55 0.614757 17745 3210.5 12082.5 First Reading For Entire File......... .3199.5 Last Reading For Entire File.......... .12124 File Trailer Service name............ .STSLIB.002 Service Sub Level Name... Version Number.......... .1.0.0 Date of Generation...... .03/10/06 Maximum Physical Record. .65535 File Type............... .LO Next File Name.......... .STSLIB.003 Physical EOF File Header Service name...... ... ... .STSLIB.003 Service Sub Level Name... Version Number..... ..... .1.0.0 Date of Generation...... .03/10/06 Maximum Physical Record. .65535 File Type............... .LO Previous File Name...... .STSLIB.002 ) Comment Record FILE HEADER FILE NUMBER: RAW MWD Curves and log BIT RUN NUMBER: DEPTH INCREMENT: # FILE SUMMARY VENDOR TOOL CODE RPD RPM RPS RPX FET GR ROP $ 3 ) header data for each bit run in separate files. 4 .5000 START DEPTH 12083.0 12083.0 12083.0 12083.0 12083.0 12090.5 12124.5 STOP DEPTH 17968.5 17968.5 17968.5 17968.5 17968.5 17961.0 18018.5 # LOG HEADER DATA DATE LOGGED: SOFTWARE SURFACE SOFTWARE VERSION: DOWNHOLE SOFTWARE VERSION: DATA TYPE (MEMORY OR REAL-TIME) : TD DRILLER (FT): TOP LOG INTERVAL (FT): BOTTOM LOG INTERVAL (FT): BIT ROTATING SPEED (RPM): HOLE INCLINATION (DEG MINIMUM ANGLE: MAXIMUM ANGLE: # TOOL STRING (TOP TO VENDOR TOOL CODE DGR EWR4 $ BOTTOM) TOOL TYPE DUAL GAMMA RAY Electromag Resis. 4 # BOREHOLE AND CASING DATA OPEN HOLE BIT SIZE (IN): DRILLER'S CASING DEPTH (FT): # BOREHOLE CONDITIONS MUD TYPE: MUD DENSITY (LB/G): MUD VISCOSITY (S): MUD PH: MUD CHLORIDES (PPM): FLUID LOSS (C3): RESISTIVITY (OHMM) AT TEMPERATURE (DEGF) MUD AT MEASURED TEMPERATURE (MT): MUD AT MAX CIRCULATING TERMPERATURE: MUD FILTRATE AT MT: MUD CAKE AT MT: # NEUTRON TOOL MATRIX: MATRIX DENSITY: HOLE CORRECTION (IN): # TOOL STANDOFF (IN): EWR FREQUENCY (HZ): # REMARKS: $ # 21-SEP-03 Insite 66.37 Memory 18019.0 12124.0 18019.0 84.7 96.1 TOOL NUMBER 129046 159439 6.125 12112.0 Flo Pro 8.80 48.0 8.7 15200 4.6 .230 .100 .200 .280 67.0 158.1 67.0 67.0 Data Format Specification R6~2rd Data Record Type..................O Data Specification Block Type.....O Logging Direction............... ..Down Optical log depth units......... ..Feet Data Reference Point............. . Undefined Frame Spacing.................... .60 .1IN Max frames per record..... . . . . . . . .Undefined Absent value. . . . . . . . . . . . . . . . . . . . . . -999 Depth Units. . . . . . . . . . . . . . . . . . . . . . . Datum Specification Block sub-type...O ') Name Service Order Units Size Nsam Rep Code Offset Channel DEPT FT 4 1 68 0 1 ROP MWD040 FT/H 4 1 68 4 2 GR MWD040 API 4 1 68 8 3 RPX MWD040 OHMM 4 1 68 12 4 RPS MWD040 OHMM 4 1 68 16 5 RPM MWD040 OHMM 4 1 68 20 6 RPD MWD040 OHMM 4 1 68 24 7 FET MWD040 HOUR 4 1 68 28 8 First Last Name Service Unit Min Max Mean Nsam Reading Reading DEPT FT 12083 18018.5 15050.8 11872 12083 18018.5 ROP MWD040 FT/H 0.12 565.93 88.8551 11789 12124.5 18018.5 GR MWD040 API 33.98 86.25 58.3043 11742 12090.5 17961 RPX MWD040 OHMM 0.23 1830.45 20.2384 11772 12083 17968.5 RPS MWD040 OHMM 0.27 1923.14 22.5235 11772 12083 17968.5 RPM MWD040 OHMM 0.4 2000 26.3669 11772 12083 17968.5 RPD MWD040 OHMM 9.43 2000 29.1217 11772 12083 17968.5 FET MWD040 HOUR 0.38 65.67 1.54038 11772 12083 17968.5 First Reading For Entire File........ ..12083 Last Reading For Entire File.......... .18018.5 File Trailer Service name............ .STSLIB.003 Service Sub Level Name... Version Number.......... .1.0.0 Date of Generation...... .03/10/06 Maximum Physical Record. .65535 File Type............... .LO Next File Name.......... .STSLIB.004 Physical EOF Tape Trailer Service name............ .LISTPE Date. . . . . . . . . . . . . . . . . . . . . 03/10/06 Origin. . . . . . . . . . . . . . . . . . . STS Tape Name. .......... .... . UNKNOWN Continuation Number..... .01 Next Tape Name.......... . UNKNOWN Comments................ .STS LIS Writing Library. Scientific Technical Services Reel Trailer Service name............ .LISTPE Date.. . . . ... . . . . . . . . . . . . .03/10/06 Origin. . . . . . . . . . . . . . . . . . . STS Reel Name............... . UNKNOWN Continuation Number..... .01 ) ) Next Reel Name.......... .uRKNOWN Comments................ .STS LIS Writing Library. Scientific Technical Services Physical EOF Physical EOF End Of LIS File