Department of Commerce, Community, and Economic Development
Alaska Oil and Gas Conservation
Commission
HOME
EVENTS
DATA
Data List
Drilling
Production
Orders
Data Miner
Document Search
REPORTS
Reports and Charts
Pool Statistics
FORMS
LINKS
Links
Test Notification
Data Requests
Regulations
Industry Guidance Bulletins
How to Apply
ABOUT US
History
Staff
HELP
Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
202-242
New Plugback Esets 7/26/2024 Well Name API Number PTD Number ESet Number Date CD2-09 PB1 50-103-20496-70-00 204-129 T39280 2-22-2006 CD2-10 PB1 50-103-20473-70-00 203-195 T39281 2-22-2006 CD2-28 PB1 50-103-20435-70-00 202-217 T39282 2-22-2006 CD2-40 PB1 50-103-20464-70-00 203-126 T39283 2-22-2006 CD2-43 PB1 50-103-20474-70-00 203-197 T39284 10-29-2004 Kasilof South 1 PB1 50-133-20520-70-00 202-256 T39285 5-16-2006 E-20AL1 PB1 50-029-22561-70-00 204-055 T39286 2-22-2006 F-57A PB1 50-029-22747-70-00 203-167 T39287 2-22-2006 G-18 PB1 50-029-23194-70-00 204-020 T39288 2-22-2006 H-16 PB2 50-029-23227-71-00 204-190 T39289 1-27-2005 I-17L1 PB1 50-029-23212-70-00 204-099 T39290 2-22-2006 S-01 PB1 50-029-23141-70-00 203-034 T39291 2-22-2006 S-08 PB1 50-029-23168-70-00 203-123 T39292 8-29-2003 S-18 PB1 50-029-23133-70-00 202-242 T39293 2-22-2006 06-23B PB1 50-029-20808-70-00 204-087 T39294 2-22-2006 07-14B PB1 50-029-20339-70-00 203-142 T39295 2-22-2006 15-38A PB1 50-029-22496-70-00 203-016 T39296 2-22-2006 C-16A PB1 50-029-20438-70-00 203-084 T39297 2-22-2006 D-28B PB1 50-029-21556-70-00 209-089 T39298 8-20-2012 E-01A PB1 50-029-20166-70-00 203-033 T39299 2-22-2006 K-03B PB1 50-029-21011-72-00 204-115 T39300 2-22-2006 NK-62A PB1 50-029-22852-70-00 203-047 T39301 2-22-2006 S-102L1 PB1 50-029-22972-70-00 203-156 T39302 10-26-2005 W-09A PB1 50-029-21947-70-00 204-102 T39303 2-22-2006 S-18 PB1 50-029-23133-70-00 202-242 T39293 2-22-2006 MEMORANDUM State of Alaska Alaska Oil and Gas Conservation Commission DATE:Friday, September 8, 2023 SUBJECT:Mechanical Integrity Tests TO: FROM:Kam StJohn P.I. Supervisor Petroleum Inspector NON-CONFIDENTIAL Hilcorp Alaska, LLC S-18 MILNE PT UNIT S-18 Jim Regg InspectorSrc: Reviewed By: P.I. Suprv Comm ________ JBR 09/08/2023 S-18 50-029-23133-00-00 202-242-0 W SPT 4238 2022420 1500 974 974 977 977 152 238 234 226 4YRTST P Kam StJohn 7/14/2023 Dual Tubing string the short string numbers are: 891/891/894/894 30 MinPretestInitial15 Min Well Name Type Test Notes: Interval P/F Well Permit Number: Type Inj TVD PTD Test psi API Well Number Inspector Name:MILNE PT UNIT S-18 Inspection Date: Tubing OA Packer Depth 65 1706 1650 1642IA 45 Min 60 Min Rel Insp Num: Insp Num:mitKPS230714132358 BBL Pumped:1.6 BBL Returned:1.6 Friday, September 8, 2023 Page 1 of 1 MEMORANDUM State of Alaska Inspection Date: 7/12019 Alaska Oil and Gas Conservation Commission TO: Jim Re gg DATE: Wednesday, July 10, 2019 / q P.I. Supervisor 11,e -]/'I'I I% 111 I SUBJECT: Mechanical Integrity Tests Hilcorp Alaska LLC 15 Min 30 Min 45 Min 60 Min S -I8 FROM: Matt Herrera MILNE PT UNIT S -I8 Petroleum Inspector 4238 Tubing Src: Inspector 796 - Reviewed BB� 795 P.I. SuprvJ1'f7— NON -CONFIDENTIAL Comm Well Name MILNE PT UNIT 5-18 API Well Number 50-029-23133-00-00 Inspector Name: Man Herrera Permit Number: 202-242-0 Inspection Date: 7/12019 Insp Num: mi[MFH 190701171230 Rel lusp Num: Packer Depth Pretest Initial 15 Min 30 Min 45 Min 60 Min Well 5-18 Type lnj' w TVI) 4238 Tubing 795 796 795 795 _ = PTD 2022420 "Type TestSwT Test psi 1500 IA 95 1731 1667 - 1656 ' BBL Pumped_ Ls BBL R�etu�rned: L6 - OA 172 337 "J 333 - 326 - Interval4YRTST IP/F — --_- _ _P._._ Notes: This well has a two tubing string completion, this report reflects results for the Long String. IA Pressure tested to 1700 PSI per Operator. Short String TBG pressures: Pr 7e 00, Ininal/770 , 15 in 30 min/700 Wednesday, July 10, 2019 - Page 1 of I STATE OF ALASKA RFCEIVED AtItA OIL AND GAS CONSERVATION COMMSION HI 2015 R REPORT OF SUNDRY WELL OPERATIONS AOGCC 1.Operations Abandon U Plug Perforations U Fracture Stimulate U Pull Tubing U Operations shutdown U Performed: Suspend ❑ Perforate ❑ Other Stimulate ❑ Alter Casing❑ Change Approved Program ❑ Plug for Redrill ❑ srforate New Pool ❑ Repair Well ❑ Re-enter Susp Well❑ Other: MBE Treatment ❑✓ 2.Operator Name: 4.Well Class Before Work: 5.Permit to Drill Number: Hilcorp Alaska,LLC Development❑ Exploratory ❑ 202-242 • 3.Address: Stratigraphic❑ Service ❑✓ 6.API Number: 3800 Centerpoint Drive,Suite 1400,Anchorage AK,99503 50-029-23133-00-00 " 7.Property Designation(Lease Number): 8.Well Name and Number: • ADL0380109 MILNE PT UNIT SB S-18 • 9.Logs(List logs and submit electronic and printed data per 20AAC25.071): 10.Field/Pool(s): N/A MILNE POINT/SCHRADER BLUFF OIL • 11.Present Well Condition Summary: Total Depth measured 8,704 " feet Plugs measured N/A feet true vertical 4,454 • feet Junk measured N/A feet Effective Depth measured 8,621 feet Packer measured 8,407&8482 feet true vertical 4,392 feet true vertical 4,238&4,290 feet Casing Length Size MD TVD Burst Collapse Conductor 112' 20" 112' 112' Surface 2,940' 9-5/8" 2,940' 2,257' 5,750psi 3,090psi Production 8,704' 7" 8,704' 4,454' 7,240psi 5,410psi Perforation depth Measured depth See Attached Schematic feet } 0s� , 2.015 True Vertical depth See Attached Schematic feet CIA SS 2-3/8" 4.7#/L-80/IBT 8,433' 4,256' Tubing(size,grade,measured and true vertical depth) LS 2-3/8" 4.7#/L-80/IBT 8,503' 4,305' 7"x 2-3/8"GT Ret.Dual Packers and SSSV(type,measured and true vertical depth) 7"x 2-3/8"FH Ret. N/A See Above N/A 12.Stimulation or cement squeeze summary: N/A Intervals treated(measured): N/A Treatment descriptions including volumes used and final pressure: N/A 13. Representative Daily Average Production or Injection Data Oil-Bbl Gas-Mcf Water-Bbl Casing Pressure Tubing Pressure Prior to well operation: 0 0 0 0 0 Subsequent to operation: 0 0 262 380 695 14.Attachments(required Per 20 AAC 25.070.25.071,&25.283) 15.Well Class after work: " Daily Report of Well Operations El Exploratory❑ Development III Service Q Stratigraphic ❑ Copies of Logs and Surveys Run ❑ 16.Well Status after work: Oil ❑ Gas ❑ WDSPL❑ • Printed and Electronic Fracture Stimulation Data ❑ GSTOR ❑ WINJ 0 WAG ❑ GINJ ❑ SUSP❑ SPLUG❑ 17.I hereby certify that the foregoing is true and correct to the best of my knowledge. Sundry Number or N/A if C.O.Exempt: 314-524 Contact Stan Porhola Email sporholaCa�hilcorp.com Printed Name /Stan Porhola Title Operations Engineer Signature Phone 777-8412 Date 10/6/2015 i Form 10-404 Revised 5/2015 i // © RBDMqC,OC I `� 201 Submit Original Only •. • Tree: CIW 2 1/16"5M Dual string MPU S 181 Orig. KB Elea..= 72.00 Wellhead:11"x 2 3/8" 5M FMC dual string Hanger thread 2 3/8"EUE top and IBT bottom Orig. GL Elev. = 38.40 2"CIW-H BPV profile I Iil,•„ro AI*,.La.LAA. Nob: 7"casing is landed on 20"x 34"insulated,215#/ft A-53 112' nc S�'p' 9 5/8"40#, L-80, IBT MOD (drift ID=8.679,cap=0.0758 bpf) 2938` Long String Short String 3009' 2-3/8"HES X-Nipple(1.875"pkg. bore) 'r „' t '=i 2-3/8"HES X-Nipple (1.875"pkg. bore) 3004' KOP @ 600' Max. hole angle = 74 deg @ 3435' Hole angle thru perfs = 45 deg 7"26#, L-80, IBT MOD Casing • (drift id=6.151,cap.= .0383 bpf) 2-3/8",4.7#/ft L-80, IBT tubing (drift id= 1.901, cap.=.00387 bpf) x 2-3/8"HES X-Nipple(1.875"pkg. bore) 8365' 8364' 2-3/8"HES X-Nipple(1.875"pkg. bore) "` ' 7"x 2-3/8"Baker"GT"Ret. dual pkr. 8407' •" ,,.“If 1.945" ID. 8421' 2-3/8"HES XN-Nipple(1.875"pkg. bore) > No-Go 1.791" 8433' Tubing tail/WLEG I l Perforation Summary ;l 7"x 2-3/8"Baker"FH"Ret. pkr. 8482 2.41" ID. Size Spf Interval (TVD) OA sands 123 2-3/8"HES XN-Nipple (1.875"pkg. bore) 8490' No-Go 1.791" 4 5/8" 5 8434'-8474' 4257'-4285' OB sands 2-3/8" Baker`E'Hydro Trip Sub 4 5/8" 5 8512`-8542' 4311`-4333' w/6`muleshoe pup(bottom depth} 8503' (1.97"pkg. bore) Hydro Trip Sub ELMD 8497` ii 1.75"ball. 8621' 7"Halliburton Float Collar PBTD 8702' 7"Halliburton float shoe ` DATE REV. BY COMMENTS MILNE POINT UNIT 2/26/03 Lee Hulme Drilled by Doyon 14 WELL No.: S-18i 3/24/03 Lee Hulme Completed by Doyon 14 API : 50-029-23133-00 • S Hilcorp Alaska, LLC llikurj,Alaska,LLC Weekly Operations Summary Well Name API Number Well Permit Number Start Date End Date MP S-18 50-029-23133-00-00 202-242 10/3/2014 11/27/2014 Daily Operations: 10/3/14-Friday T/I/0=750/10/110. Freeze protect tubing LS and F/L(Pre-MBE treatment). Rigged up diverter shelter and pumped 2 bbls 60/40 methanol to water header and 12 bbls60/40 methanol down tubing LS for freeze protect. FWHP=850/10 110. SSV/MV=Open.SV/wv/Lateral Header=Closed. IA/OA=OGT. F/L bled to Opsi per DSO. 10/18/14-Saturday T/I/0=550/-20/60. Injection test on SS(Pre-MBE). Pump 50 bbls 60/40 down SS tubing,0.6 bpm @ 920psi. FWHP=600/- 20/60. 10/22/14-Wednesday T/I/0=345/0/60. MBE treatment MPS-18SS, MIRU, PJSM. Pumped 5 bbls spear of 60/40 methanol, 5 bbls of 100 ppt HEC Gel, 15 bbls of acid soluable cement and 2.5 bbls of HEC gel. Displaced with 33.5 bbls of diesel. SD pumping and monitor WHP for 15 min. Secured well. Final WHP=950/0/60. 10/24/14-Friday T/I/0=0/-21/60. Injectivity test on SS(Post 1st stage MBE). Pressured tubing up and bled pressure back multiple times @ 1,500psi,3,000psi&3,600psi. Could not achieve injectivity. FWHP=0/-22/64. 11/11/14-Tuesday Well SI on arrival.SS Bailer Runs. Ran 1.77" Cent, 1.5" bailer S/D @ 7,248'SLM. Recovered small piece of foam ball. Ran 1.77"Cent,5'x 1.75"Cent pump bailer, unable to get past 6,783'SLM. Empty bailer. Well SI on departure. 11/26/14-Wednesday CTU#8 arrived on location. Begin RU and spotting choke house, returns tank, heaters, install up heater ducts.Spot 10 bbl methanol pup tank,triplex pump, bleed tank,WSM office. Run hard lines from CTU unit to choke and short string. 11/27/14-Thursday Test BOPE stack on deck.Witness waived by Jim Regg on 11/26/2014 09:45. Perform pull test on coil tubing connector. Test good. MU BOP stack to pump in sub(PIS)and adapter spool on Short string on tree.Test 4-1/16"5M spool. PU MU swirl nozzle tool, (2)weight bars,dual check valve, rollon coil tubing connector.Offload 140 bbls.8.5 ppg 2%KCL with 1 lb. per bbl PowerVis viscosifier friction reducer in 400 bbl upright tank.Offload 290 bbls 60/40 methanol/water mix in second 400 bbl. Upright tank.TIH to while circulating @ 0.89 bpm, @ 3,800 psi.Tagged cement @ 7,287.9. Worked jet nozzle to / 7,366'. Hard cement,attempt to make progress with jet nozzle. No luck. POOH. Called for mill and motor. On location in 2- C1 \ )/2 hours. PU 1.73" bladed mill, 1.69" motor, FAU disconnect,dual circulation valve,oil jar,dual back pressure valve,coil 'i° tubing connector.TIH to 7,366'. Begin milling cement with various pump rates from 0.50 to 0.98 bpm pressures from 3,200 -3,900 psi.Continue milling cement to 8,452'plus approximate 14'stretch coil tubing measurements(CTM)end of mill @ 8,466'.Circulate short string clean. POOH with milling assembly. Called for tank trucks with 2%KCL thru the milling process. Called for VAC truck to remove used workover fluids from return tank. Perform injectivity test.Slowly increased pump rate to 1.0 bpm and achieved injectivity at 1.0 bpm @ 1,160 psi. Bleed off priessure. ND BOPE, RD CTU#8. Remove hard lines from choke and fluid lines from return tank and source tank. MEMORANDUM State of Alaska Alaska Oil and Gas Conservation Commission TO: Jim Regg DATE: Monday,July 20,2015 P.I.Supervisor �e �I (i s cSUBJECT: Mechanical Integrity Tests / HILCORP ALASKA LLC S-18 FROM: Jeff Jones MILNE PT UNIT SB S-18 Petroleum Inspector Src: Inspector Reviewed By: P.I.Supry :33e— NON-CONFIDENTIAL NON-CONFIDENTIAL Comm Well Name MILNE PT UNIT SB S-18 API Well Number 50-029-23133-00-00 Inspector Name: JeffJones Permit Number: 202-242-0 Inspection Date: 7/3/2015 Insp Num: mitJJ150706102856 Rel Insp Num: Packer Depth Pretest Initial 15 Min 30 Min 45 Min 60 Min WeII s-Is • Type Inj W TVD 4238 Tubing 780 • iso r750 750 .-PTD 2022420 ,1Type Test SPT Test psi 1500 ' IA 1 225 1800 1761 1751 — Interval 4YRTST P/F P ✓ OA 150 250 250 250 Notes: 1 well inspected. Monday,July 20,2015 Page 1 of 1 STATE OF ALASKA DEC 1 9 2012 ALIIIL OIL AND GAS CONSERVATION COMNWION - REPORT OF SUNDRY WELL OPERATIONS AOGCC 1. Operations Abandon [J Repair Well U Plug Perforations Li Perforate Li Other U MBE Treatment Performed: Alter Casing ❑ Pull Tubing ❑ Stimulate - Frac ❑ Waiver ❑ Time Extension ❑ Change Approved Program ❑ Operat. Shutdown ❑ Stimulate - Other ❑ Re -enter Suspended Well ❑ 2. Operator 4. Well Class Before Work: 5. Permit to Drill Number: Name: BP Exploration (Alaska), Inc Development ❑ Exploratory ❑ r 202 -242 -0 3. Address: P.O. Box 196612 Stratigraphic ❑ Service El 6. API Number: C00 `aF-h Anchorage, AK 99519 -6612 — 50- 029 - 2313 la. 7. Property Designation (Lease Number): 8. Well Name and Number: ADL0380109 ' 0 MPS -18SS 9. Logs (List logs and submit electronic and printed data per 20AAC25.071): 10. Field /Pool(s): To Be Submitted MILNE POINT, SCHRADER BLFF OIL 11. Present Well Condition Summary: Total Depth measured 8704 feet Plugs measured None feet true vertical 4453.74 feet Junk measured None feet Effective Depth measured 8621 feet Packer measured See Attachment feet true vertical 4391.74 feet true vertical See Attachment feet Casing Length Size MD TVD Burst Collapse Structural None None None None None None Conductor 80 20" X 34" 215.5# A53 32 -112 32 -112 0 0 Surface 2909 9 -5/8" 40# L -80 31 - 2940 31 - 2257.43 5750 3090 Intermediate None None None None None None Production 8674 7" 26# N -80 30 - 8704 30 - 4453.74 7240 5410 Liner None None None None None None Perforation depth Measured depth 8434 - 8474 feet True Vertical depth 4182.43 - 4210.18 feet SCANNED MAR 18 2013 Tubing (size, grade, measured and true vertical depth) 2 -3/8" 4.7# L -80 29 - 8433 29 - 4255.44 Packers and SSSV (type, measured and true vertical depth) See Attachment See Attachment See Attachment Packer None None None SSSV 12. Stimulation or cement squeeze summary: Intervals treated (measured): Treatment descriptions including volumes used and final pressure: 13. Representative Daily Average Production or Injection Data Oil -Bbl Gas -Mcf Water -Bbl Casing Pressure Tubing Pressure Prior to well operation: 534 60 Subsequent to operation: 476 0 14. Attachments: 15. Well Class after work: Copies of Logs and Surveys Run Exploratory ❑ Development ❑ Service IN Stratigraphic ❑ Daily Report of Well Operations X 16. Well Status after work: 16 Oil ❑ Gas ❑ WDSPL ❑ GSTOR ❑ WINJ 0 WAG ❑ GINJ ❑ SUSP❑ SPLUG ❑ 17. I hereby certify that the foregoing is true and correct to the best of my knowledge. Sundry Number or N/A if C.O. Exempt: 312 -395 Contact Nita Summerhays Prepared by Nita Summerhays 564 -4035 E -mail Nita.Summerhaysabp.com Printed Name Nita Summerhays Title Petrotechnical Data Technician / A .„,= Phone 564 -4035 Date 12/19/2012 /Z.Z-0•fv 4.2 Form 10-404 Revised 11/2011 Submit Original Only • • Daily Report of Well Operations ADL0380109 HES MBE Thermatek treatment: Pumped 5 bbls MEOH then 60 bbls produced water 0.58 bpm max injection pressure 900 psi. Pumped 5 bbls Kmax gel, 10 bbls Thermatek treatment, 4 bbls Kmax gel. Displaced with 31.1 bbls diesel to freeze protect surface lines and wellbore. Good pressure responses noted during job. « < »> Will return 11 -16 -12 to perform new 11/18/2012 injectivity test and evaluate for H2Zero gel treatment. HES MBET hermatek treatment:Post Thermatek injectivity test. Performed passing low and high pressure tests, opened well up and began pumping MEOH, after surrging and getting fluid to move established an injection rate at 0.5 bpm @ 1050 psi increased rate to 1.0 bpm @ 1120 psi. Good injectivity order H2Zero gel fluids for final treatment. Fluids on location. PT, Open Well and begin pumping schedule for H2Zero.....Job 11/19/2012 Continued on WSR 11- 20- 12.... HES MBE Thermatek treatment Complete H2Zero injection and treament. Displace to fomation and freeze protect tubing. 11/20/2012 Haliburton Rig down and Move to Shop. FLUIDS PUMPED BBLS 31.1 DIESEL 5 METH 415 H2ZERO GEL 9 KMAX GEL 10 THERMATEK 15 60/40 METH 485.1 TOTAL • • Packers and SSV's Attachment ADL0380109 SW Name Type MD ND Depscription • MPS -18SS PACKER 8407 4164.31 2 -3/8" Baker GT Dual Packer MPS -18SS PACKER 8482 4215.86 2 -3/8" Baker FH Packer Tree: CIW 2 1 W x 2 5M Dual M P U S-1 8 i Orig. KB Elev. = 72.00 ellhead:11" x 2 3/8" 5M FMC dual string Hanger thread 2 3/8" EUE top and IBT bottom Orig. GL Elev. = 38.40 2" CIW -H BPV profile Note: 7" casing is landed on 20" x 34" insulated, 215 #/ft A -53 112' I emergency slips 9 5/8" 40 #, L -80, IBT MOD (drift ID = 8.679, cap = 0.0758 bpf) 2938' Long String Short String 3009' 2 -3/8" HES X- Nipple (1.875" pkg. bore) 2 -3/8" HES X- Nipple (1.875" pkg. bore) I 3004' I KOP @ 600' Max. hole angle = 74 deg @ 3435' Hole angle thru perfs = 45 deg 7" 26#, L -80, IBT MOD Casing (drift id = 6.151, cap.= .0383 bpf) 2 -3/8 ", 4.7 #/ft L -80, IBT tubing (drift id = 1.901, cap. = .00387 bpf) 2 -3/8" HES X- Nipple (1.875" pkg. bore) I 8365' I I 8364' I 2 -3/8" HES X- Nipple (1.875" pkg. bore) ' 7" x 2 -3/8" Baker "GT" Ret. dual pkr. 1 8407' I 1.945" ID. • I 8421' I 2 -3/8" HES XN- Nipple (1.875" pkg. bore) XN No -Go 1.791" 8433' I Tubing tail / WLEG bE 0 A i v L Perforation Summary 7" x 2 -3/8" Baker "FH" Ret. pkr. 8482 I 2.41" ID. Size Spf Interval (TVD) OA sands 2 -3/8" HES XN- Nipple (1.875" pkg. bore) I 8490' I No -Go 1.791" 4 5/8" 5 8434' - 8474' 4257' - 4285' OB sands 2 -3/8" Baker 'E' Hydro Trip Sub 4 5/8" 5 8512' - 8542' 4311' - 4333' W/ 6' muleshoe pup (bottom depth) 8503' (1.97" pkg. bore) N ot, Hydro Trip Sub ELMD 1 8497' I © 1.75" ball. 8621' I 7" Halliburton Float Collar PBTD j 8702' 7" Halliburton float shoe • DATE REV. BY COMMENTS 2/26/03 Lee Hulme Drilled by Doyon 14 MILNE POINT UNIT WELL No.: S -18i 3/24/03 Lee Hulme Completed by Doyon 14 API : 50 -029- 23133 -00 BP EXPLORATION (AK) • • wP� r„ THE STATE Alaska Oil and Gas �'� °fALAS� Conservation Commission GOVERNOR SEAN PARNELL TR „ 333 West Seventh Avenue ALA85 Anchorage, Main: 907.279.1433 JAN 13 2013 Fax: 907.276.7542 Alecia Wood SCANNED MPU Schrader Pad Engineer 1,0 a gi 4-9- BP Exploration (Alaska), Inc. P.O. Box 196612 Anchorage, AK 99519 -6612 Re: Milne Point Field, Schrader Bluff Oil Pool, SBL MPS -18SS Sundry Number: 312 -395 Dear Ms. Wood: Enclosed is the approved Application for Sundry Approval relating to the above referenced well. Please note the conditions of approval set out in the enclosed form. As provided in AS 31.05.080, within 20 days after written notice of this decision, or such further time as the Commission grants for good cause shown, a person affected by it may file with the Commission an application for reconsideration. A request for reconsideration is considered timely if it is received by 4:30 PM on the 23rd day following the date of this letter, or the next working day if the 23rd day falls on a holiday or weekend. Sincerely, Cathy . Foerster Chair DATED this (7 day of October, 2012. Encl. • pl CI ' STATE OF ALASKA 1 AV ` ,O O C T j 2012 ALASKA OIL AND GAS CONSERVATION COMMISSION /3 A3/ 1 6 � l APPLICATION FOR SUNDRY APPROVALS AOGC 20 AAC 25.280 1. Type of Request: Abandon ❑ Plug for Redrill ❑ Perforate New Pool ❑ Repair Well ❑ Change Approved Program ❑ Suspend ❑ Plug Perforations❑ Perforate ❑ Pull Tubing ❑ Time Extension ❑ Operations Shutdown ❑ Re -enter Susp. Well❑ Stimulate ❑ Alter Casing ❑ Other. MBE Treatment El • 2. Operator Name: 4. Current Well Class: - 5. Permit to Drill Number BP Exploration (Alaska), Inc. Development ❑ Exploratory ❑ 202 -242 -0 - 3. Address: Stratigraphic ❑ Service El • 6. API Number. P.O. Box 196612, Anchorage, AK 99519 - 6612 50-029- 23133 -81 -00 • 7. If perforating: 8. Well Name and Number. What Regulation or Conservation Order govems well spacing in this pool? SBL MPS - 18SS • Will planned perforations require a spacing exception? Yes ❑ No ❑ 9. Property Designation (Lease Number): 10. Field /Pool(s): ADL0380109 • MILNE POINT, SCHRADER BLFF OIL ' 11. PRESENT WELL CONDITION SUMMARY Total Depth MD (ft): Total Depth TVD (ft): Effective Depth MD (ft): Effective Depth TVD (ft): Plugs (measured): Junk (measured): 8704 ' 4454 • 8482 4290 None None Casing Length Size MD TVD Burst Collapse Structural Conductor 80 20 "X34" 215.5# A53 32 - 112 32 -112 Surface 2905 9 -5/8" 40# L -80 35 - 2940 35 - 2257.43 5750 3090 Intermediate None None None None None None Production 8672 7" 26# N -80 32 - 8704 32 - 4453.74 7240 5410 Liner None None None None None None Perforation Depth MD (ft): Perforation Depth TVD (ft): Tubing Size: Tubing Grade: Tubing MD (ft): 8434 - 8474 4256.12 - 4283.87 2 -3/8" 4.7# L -80 L-80 30 - 8433 Packers and SSSV Type: 2 -3/8" Baker GT Dual Packer Packers and SSSV MD (ft) and TVD (ft): 8407, 4238 No SSSV Installed No SSSV Installed 12. Attachments: Description Summary of Proposal ❑ 13. Well Class after proposed work: Detailed Operations Program 111 BOP Sketch ❑ Exploratory ❑ Development ❑ Service 1151 ' 14. Estimated Date for 15. Well Status after proposed work: Commencing Operations: Oil ❑ Gas ❑ WDSPL ❑ Suspended ❑ 16. Verbal Approval: Date: WINJ El • GINJ ❑ WAG ❑ Abandoned ❑ Commission Representative: GSTOR ❑ SPLUG 0 17. I hereby certify that the foregoing is true and correct to the best of my knowledge. Contact Alecia Wood Email Alecia.Wood @BP.Com Printed Name Alecia Wood Title MPU Schrader Pad Engineer Signature Phone 564 -5492 Date VQk eia, u Q I Op o /l COMMISSION USE ONLY Conditions of approval: Notify Commission so that a representative may witness Sundry Number 3 / ' . 3Q _ I s Plug Integrity ❑ BOP Test ❑ Mechanical Integrity Test ❑ Location Clearance ❑ Other: Spacing Exception Required? Yes ❑ No ❑ Subsequent Form Required: Oct ° C q APPROVED BY Approved by: (tVii / COMMISSIONER THE COMMISSI N Date: /) 7 7 r /� ,a 0 R r JC3il/2OlO /J'; Approv d application is valid for 12 months from the date o approval. Submit in Duplicate J bp To: Mark O'Malley /Rob Handy Date: July 06, 2012 MPU Ops Team Leaders • From: Alecia Wood, MPU Schrader Pad Engineer 907 - 564 -5492 Subject: MPS -18SS MBE Treatment Step Unit Operation 1 F Shut in all offset producers. Bullhead water into MPS -18SS 2 F Bullhead treatment down MPS -18SS (OA sand). Keep well and offset producers and injectors shut in for minimum of 2 days and flow producers to a tank before returning to production if necessary. OBJECTIVE 1. Divert water by sealing the preferential path of injection with a cement acting fluid and a rigid gel. �--- Measure of success 1. Treatments are displaced into formation. 2. Post injection is adequate to achieve injection rate target at below target pressure. 3. Decrease of watercut over time in offset producers is observed. CRITICAL ISSUES • Ensure pumping pressure is not above the fracture gradient. • Ensure cleanliness of pump equipment and hard line (pre and post job) & properly dispose of remnant fluid per guidance from the Environmental Team. Background / MPS -18 is a dual string injector in the OA and OB drilled and completed in March 2003. The well has injected 1.86mmbbls of water into the OB, and 1.83mmbbls of water into the OA_ S -18SS developed an MBE in January 2007 in the OA sands to producer MP,S29 which is currently Not Operable. The second MBE in MPS -18SS is to producer MPS -19A. There is a possibility of string communication as an MBE was noted from S -18LS to MPS -19A. MPS -19A is an OA only well, the LS injects into the OB, a red dye test was performed to confirm the communication between MPS -18SS (OA) and MPS - 19A, therefore it is likely there that string communication is the reason for the LS to show a connection to MPS -19A. • PROCEDURE Stage 1. Injection Test 1. RU, hold pre job safety meeting, PT surface lines 2. Ensure offset producers are SI. • 3. Spear in with Methanol, followed by produced water. Attempt to hold injection rate constant while adjusting pressure as needed. 4. Contact Engineering to discuss the injection pressure /rate trends. Once consensus is achieved that the fluid can be successfully placed into formation at acceptable rate /pressure continue with remainder of program. Stage 2. Treatment 5. Ensure offset producers are offline 6. Pump produced water pre -flush followed by cement acting fluid treatment and diesel displacement. Allow setup time. 7. Pump produced water pre -flush followed by high volume gel treatment and diesel over flush. 8. Capture a gel sample at surface and suspend in a warm water bath (to simulate downhole conditions) to monitor actual setting time. 9. Rig down all equipment and hold post job assessment meeting to capture learnings to be incorporated into future jobs. 10. Forward all post job assessments (w/ all rheology test summary) and continuous pressure and rate data from job to Pad Engineer. • • Tree. a "5M Dual string `1^U S_I81 Orig.KBElev.= 72.{X) Wellhead:l l' x 2 33' '�t SM FMC dual string �+ Hager thread 2 3'8' EUE top and iBT 411 bottor^ - - Orig. GI_ Elev. = 38.40 2' ClV -H BPV profile Note 7° casing Is landed on 2D'x34'Ink ed,215t'ft 531112' I emergency sups 9 W409, L-80, lBT MOD WWI tD is ten. , cep = 9.0758 bet) (2936' Long String Short String 130 " I 2 -3;8' HES X- Nipple {1.875` pkg, bore; I _ -lE lipplc ' n *.g bore. I 3334 I K'P ; 600' Max. hole angle = 74 deg ;i . 34%35 Hole angle thry perch = : 5 deg 7` 284, L -80, IBT MOO Casing (drift Id = 6.181, cap = .0383 WI 2-318". 4 -7 #Nft L -B0. IBT tubing (drift itl= 1.001, cap.= 00387 bpt) 8384' I 2 -398' FIES X- Nzppte (1 -875' pkg. bac n ET 2 -3'8' HES X- Nipple 11 .875' pkg bore} 183e6' I 7` x 2 -316' Baker "GT Ret. dual pkr. 1 3407 I 1.e4_`r 6D I 842 I 2 -318" HES XI's- Nipple {1.875' pkg bore No-Go 1.791' I 342.2'' I Tubing tail WLE.3 Perforation Summary B B 7' x 2 -313` Baker"FH" Ret. pkr. 1 846 I 2.41' ID Size Sp€ Interval iT'J0 DA aandg 0 2-3 °" HES xNl- Nipple 1,1.875' pkg. bore{ 1 84'03' I No-Go 1.781' 4 F,'8' 5 84x4' - B 4257' - 4265' C18 sanaq 4 5l8' 5 651 - 6542' 4311' - 4333' Baker £ Hydra Trip Sub 1 8533' wt3' u muleshae pup 11 n depth; (1.93" pkg. bare) o., Hydro Trip Sub ELMD I 34 I 1.75 ball. 1 88,21' I 7` Hal Carton Float Collar PETE 1 8702' I 7' Haliiburton float shoe DATE REV. BY ENT 228 33 Lee Hulme Drilled oy Doycr. 14 IVIILNE POINT UNIT WELL No.: 5 - 181 3 ‘24t0's Lee Hulnue Compietec by Doyon 14 API : 50 - 23133 - BP EXPLORATION (AK) • by BP Exploration (Alaska) Inc. Attn: Well Integrity Coordinator, PRB -20 Post Office Box 196612 Anchorage, Alaska 99519 -6612 st.mit4En FEB ¶ 4 2012 December 30, 2011 Mr. Tom Maunder c� / I Alaska Oil and Gas Conservation Commission `T a. • 333 West 7 Avenue O off, Anchorage, Alaska 99501 M S - I g Subject: Corrosion Inhibitor Treatments of MPS -Pad Dear Mr. Maunder, Enclosed please find multiple copies of a spreadsheet with a list of wells from MPS -Pad that were treated with corrosion inhibitor in the surface casing by conductor annulus. The corrosion inhibitor is engineered to prevent water from entering the annular space and causing external corrosion that could result in a surface casing leak to atmosphere. The attached spreadsheet represents the well name, API and PTD numbers, top of cement depth prior to filling and volumes of corrosion inhibitor used in each conductor. As per previous agreement with the AOGCC, this letter and spreadsheet serve as notification that the treatments took place and meet the requirements of form 10 -404, Report of Sundry Operations. If you require any additional information, please contact me or my alternate, Gerald Murphy, at 659 -5102. Sincerely, Mehreen Vazir BPXA, Well Integrity Coordinator III III BP Exploration (Alaska) Inc. Surface Casing by Conductor Annulus Cement, Corrosion inhibitor, Sealant Top -off Report of Sundry Operations (10 -404) 1 MPS -Pad 1 10/11/2011 Corrosion Vol. of cement Final top of Cement top off Corrosion inhibitor/ Well Name PTD # API # Initial top of cement pumped cement date inhibitor sealant date ft bbls ft gal MPS-01A 2070340 50029231410100 0.25 NA 0.25 NA 5.1 9/6/2011 MPS-02 2031270 50029231690000 2.5 NA 2.5 NA 23.8 7/30/2011 MPS-03 2021460 50029231050000 Open Flutes - Treated MPS-04 2030520 50029231480000 1.7 NA 1.7 NA 17.0 7/30/2011 MPS-05 2021370 50029231000000 Open Flutes - Treated MPS-06 2031090 50029231630000 1.7 NA 1.7 NA 17.0 7/30/2011 MPS-07 2020720 50029230790000 1 NA 1 NA 13.6 11/3/2009 MPS -08 2031230 50029231680000 1.3 NA 1.3 NA 10.2 7/3012011 MPS-09 2020200 50029230670000 0.5 NA 0.5 NA 5.1 11/3/2009 MPS -10A 2051250 50029231520100 1.3 NA 1.3 NA 11.9 7/29/2011 MPS-11 2021130 50029230920000 1 NA 1 NA 10.2 729/2011 MPS-12 2030230 50029231390000 0.6 NA 0.6 NA 6.8 7/29/2011 MPS -13 2021240 50029230930000 1 NA 1 NA 11.9 11/3/2009 MPS -14 2031040 50029231620000 1.8 NA 1.8 NA 22.1 7/29/2011 MPS-15 2012450 50029230610000 9.6 NA 9.6 NA 88.4 7/31/2011 MPS-16 2030650 50029231510000 1.2 NA 1.2 NA 102 7292011 MPS -17 2021730 50029231150000 Open Flutes - Treated ""'"--0111. MPS -18 2022420 50029231330000 1.3 NA 1.3 NA 11.9 7/29/2011 MPS -19A 2022330 50029231210100 1.8 NA 1.8 NA 23.8 7/29/2011 MPS-20 2022410 50029231320000 1.3 NA 1.3 NA 11.9 7292011 MPS-21 2020090 50029230650000 1.8 NA 1.8 NA 22.1 11/3/2009 MPS-22 2031470 50029231760000 9.1 NA 9.1 NA 83.3 7/28/2011 MPS-23 2021320 50029230980000 Open Flutes - Treated MPS-24 2030380 50029231420000 1.3 NA 1.3 NA 10.2 7/28/2011 MPS -25 2021030 50029230890000 Open Flutes - Treated MPS -26 2030610 50029231500000 1 NA 1 NA 8.5 7/28/2011 MPS -27 2020850 50029230840000 0.9 NA 0.9 NA 8.5 7/28/2011 MPS-28 2030940 50029231580000 1.1 NA 1.1 NA 11.9 7/28/2011 MPS -29 2021950 50029231190000 Open Flutes - Treated MPS-30 2022360 50029231310000 1.2 NA 1.2 NA 11.9 7/28/2011 MPS -31 2020140 50029230660000 Open Flutes - Treated MPS-32 2030920 50029231570000 0.8 NA 0.8 NA 6.8 7/28/2011 MPS-33A 2061720 50029231230100 1 NA 1 NA 6.8 7/28/2011 MPS-34 2031300 50029231710000 6 NA 6 NA 49.3 7/28/2011 MPS-35 2031430 50029231750000 1.2 NA 1.2 NA 11.9 7/28/2011 MPS -37 2070520 50029233550000 13.9 Need top job NA MPS-39 2081830 50029234050000 0.7 NA 0.7 NA 4.3 8/18/2011 MPS-41A 2081610 50029234010100 Sealed NA NA NA NA NA MPS-43 2081760 50029234040000 Dust Cover NA NA NA 6.8 10/11/2011 MPS -90 2051350 50029232760000 0.6 NA 0.6 NA 3.4 9/6/2011 MPSB-04 500299990799 0.6 NA 0.6 NA 3.4 7/30/2011 0 0 MEMORANDUM State of Alaska Alaska Oil and Gas Conservation Commission ,----) TO. gg (� f DATE: Wednesday, July 13, 2011 im P Supervisor °}1 (1 7 1I ' /bl SUBJECT: Mechanical Integrity Tests BP EXPLORATION (ALASKA) INC S -18 FROM: Bob Noble MILNE PT UNIT SB S -18 Petroleum Inspector Src: Inspector Reviewed By: P.I. Supry :.1 NON Comm Well Name: MILNE PT UNIT SB S -18 API Well Number: 50- 029 - 23133 -00 -00 Inspector Name: Bob Noble Insp Num: mitRCN110708142850 Permit Number: 202 -242 -0 Inspection Date: 7/7/2011 Rel Insp Num: Packer Depth Pretest Initial 15 Min. 30 Min. 45 Min. 60 Min. Well 1 5 -18 ' Type Inj. 1 W'I TVD i 4238 ' IA 50 2020 ' 1980 1975 . P.T.D 2022420' TypeTest SPT Test psi 2020 • OA 160 260 220 200 Interval 4YRTST p/F P - Tubing 600 600 600 600 . _ -- Notes: /Al A . ! -e 6-) leS'k• I stars; a- .41k Na) JUL 1 s Lti�! Wednesday, July 13, 2011 Page 1 of 1 , C -1- ri y g ki 0 SEAN PARNELL, GOVERNOR L I L ALASKA OIL AND GAS 333 W. 7th AVENUE, SUITE 100 CONSERVATION COMMISSION ANCHORAGE, ALASKA 99501-3539 PHONE (907) 279-1433 FAX (907) 276-7542 Ms. Kaity Longden Production Engineer BP Exploration (Alaska), Inc. P.O. Box 196612 Anchorage, AK 99519-6612 W)— Re: Milne Point Field, Schrader Bluff Pool, MPS- 18LS Sundry Number: 309-386 8 2009) Dear Ms. Longden: Enclosed is the approved Application for Sundry Approval relating to the above referenced well. Please note the conditions of approval set out in the enclosed form. When providing notice for a representative of the Commission to witness any required test, contact the Commission's petroleum field inspector at (907) 659-3607 (pager). As provided in AS 31.05.080, within 20 days after written notice of this decision, or such further time as the Commission grants for good cause shown, a person affected by it may file with the Commission an application for rehearing. A request for rehearing is considered timely if it is received by 4:30 PM on the 23rd day following the date of this letter, or the next working day if the 23rd day falls on a holiday or weekend. A person may not appeal a Commission decision to Superior Court unless rehearing has been requested. Sincerely, AJO. rman 0 :t omm over DATED this Wday of November, 2009 Encl. p "OA ,�� STATE OF ALASKA RECEIVED -4" 56 II�� ALASAIL AND GAS CONSERVATION COMMISS11? NOV 1 6 2009 X APPLICATION FOR SUNDRY APPROVALS 20 AAC 25.280 ion 1. Type of Request: Abandon ❑ Suspend ❑ Operational shutdown E] Perforate ❑ Re -enter Suspended W��IC&B Alter casing ❑ Repair well ❑ Plug Perforations 11 Stimulate ❑ Other Q . Specify: MBERepair Change approved program ❑ Pull Tubing ❑ Perforate New Pool ❑ Time Extension ❑ 2. Operator Name: 4. Current Well Class: 5. Permit to Drill Number: BP Exploration (Alaska), Inc. Development ❑ Exploratory ❑ 202 -2420 3. Address: P.O. Box 196612 Stratigraphic ❑ Service ❑ 6. API Number: tI Anchorage, AK 99519 -6612 50-029-23133- 800 7. If perforating, closest approach in pool(s) opened by this operation to nearest 8. Well Name and Number: property line where ownership or landownership changes: Spacing Exception Required? Yes ❑ No F-1 MPS -18LS 9. Property Designation (Lease Number): 10. Field / Pool(s): ADLO- 380109 Milne Point Field / Schrader Bluff Pool 11. PRESENT WELL CONDITION SUMMARY Total Depth MD (ft): Total Depth TVD (ft): Effective Depth MD (ft): Effective Depth TVD (ft): Plugs (measured): Junk (measured): 8704 4453.74. 8621 4391.74 NONE NONE Casing Length Size MD TVD Burst Collapse Structural Conductor 112 20" 92# 215# A -53 Surface 112 Surface 112 Surface 2940 9 -5/8" 40# L -80 35 2940 35 2257 5750 3090 Intermediate 8704 7" 26# N -80 32 8704 1 32 4454 7240 5410 Production Liner ing MD (ft): Surface -8503' Perforation Depth MD (ft): Perforation Depth TVD (ft): Tubing Size: LS 2 -3/8" 4.6# Tubing Grade: L -80 Tub see attached - - SS 2 -3/8" 4.7# L -80 Surface - 8433' Packers and SSSV Tvge: 7 "X2 -3/8" Baker "GT' Rat dual PKR Packers and SSSV MD and TVD (ft): 8407' 4238' 7 "X2 -3/8" Baker "FH' Rat PKR 8482' 4290' 12. Attachments: Description Summary of Proposal ® 13. Well Class after proposed work: i Detailed Operations Program ❑ BOP Sketch ❑ Exploratory ❑ Development ❑ Service ❑� 14. Estimated Date for 15. Well Status after proposed work: Commencing Operations: 11/30/2009 Oil ❑ Gas ❑ WDSPL ❑ Plugged ❑ 16. Verbal Approval: Date: WINJ ❑✓ GINJ ❑ WAG ❑ Abandoned ❑ Commission Representative: GSTOR ❑ SPLUG ❑ 17. 1 hereby certify that the foregoing is true and correct to the best of my knowledge. Contact Kaity Longden Printed Name Kaity Longden Title P.E. Signature Phone Date 564 -5554 11/16/2009 Prepared by Gary Preble 564 -4944 COMMISSION USE ONLY R Conditions of approval: Notify Commission so that a representative may witness Sundry Number:y Plug Integrity ❑ BOP Test ❑ Mechanical Integrity Test ❑ Location Clearance ❑ Other: Subsequent Form Required: 16. • 6 APPROVED BY 2 Approved by: OMMISSIONER THE COMMISSION Date: �!� ✓� �" Plow `r NAL Form 10 -403 Revised 07/2009 Submit in Duplicate MPS- 18SS /LS 202 -242 PERF ATTACHMENT Sw Name Operation Date Perf Operation Code Meas Depth Top Meas Depth Base Tvd Depth Top Tvd Depth Base MPS -18LS 3/22/03 PER 8,512. 8,542. 4,311.2 4,333.15 MPS -18SS 3/22/03 PER 8,434. 8,474. 4,256.12 4,283.87 AB ABANDONED PER PERF APF ADD PERF RPF REPERF BPP BRIDGE PLUG PULLED SL SLOTTED LINER BPS BRIDGE PLUG SET SPR SAND PLUG REMOVED FCO FILL CLEAN OUT SPS SAND PLUG SET FIL FILL I SQF SQUEEZE FAILED MIR MECHANICAL ISOLATED REMOVED SQZ SQUEEZE MIS MECHANICAL ISOLATED STC STRADDLE PACK, CLOSED P MLK MECHANICAL LEAK STO STRADDLE PAC K OPEN OH OPEN HOLE by 0 To: Mark O'Malley /Jerry Sharp Date: November 13, 2009 MPU Well Operations Supervisor From: Jack Lau, Wells Engineer 227 -2760 Kaity Longden, MPU Schrader -E Pad Engineer Subject: MPS -18 LS Gel Job Step Unit Operation 1 O Shut in all offset producers and other injector string. Bullhead water into MPS - 181-S. 2 O Bullhead gel treatment down MPS -181-S. Keep well and offset producers and injectors shut in for minimum of 2 days and flow producers to a tank before returning to production. OBJECTIVE 1. Divert water by sealing the preferential path of injection with a rigid gel. Measure of success 1. Gel treatments are fully displaced into formation. 2. Post injection is adequate to achieve injection rate target at below target pressure. 3. Decrease of watercut over time in offset producers is seen. CRITICAL ISSUES • Ensure pumping pressure is not above the fracture gradient. • Ensure cleanliness of pump equipment and hard line (pre and post job) & properly dispose of remnant gel per guidance from the Environmental Team. PROCEDURE Stagel. Injection Test 1. RU, hold pre -job safety meeting, PT surface lines 2. Ensure other injector string and offset producers are SI 3. Spear in with Methanol, followed by produced water. Attempt to hold injection rate constant while adjusting pressure as needed. 4. Contact Engineering to discuss the injection pressure /rate trends. Once consensus is achieved that the fluid can be successfully placed into formation at acceptable rate /pressure continue with remainder of program. Stage 2. High Volume Gel Treatment 5. Ensure other injector string and offset producers are offline 6. Pump produced water preflush, followed by gel treatment and produced water over flush, then freeze protect. 7. Capture a gel sample at surface and suspend in a warm water bath (to simulate downhole conditions) to monitor actual setting time. 8. Rig down all equipment and hold post -job assessment meeting to capture learnings to be incorporated into future jobs. 9. Forward all post job assessments (w/ all rheology test summary) and continuous pressure and rate data from job to Pad Engineer. I Tree: CrW 2 W6' 5M Dual string g .^_tl KB Elea. - 7.00 Wellhead: 11' x 2 3or SM FM = s71n M 9 t-an ttrea�t 2IB' EUE tDp and IB7 t^anz Orlg. GL Elev. - 35.40 2' I^.t1v p pra ft e Nato-: P oa&Vwjl Is WWsd an 20' x 34' r&Aa1L[L1_ 213 IM A 0 o-merpenay os 9 SW AION, UkQ IST MOD (drA ID n 8.679, cap a 88758 bpfi y3.o Lana Strina Short Strirww 30W 2-316` HES X- 141pple 11E ptg• tae; 24 I-Es x--MU e, p4g bCfei a0id KOP =-- max_ note angle - 74 deg Q 3435' hole angle lhru pens - 45 aeg 7"26*. L-813. IBT MOO using (drat Id - &151, cam.- .G383 bpr, 2 -1 4.7 #At L-86, Wr G6l Wg T - 1.901, cap. -AX087 tM c. ;a 2 3 c' HEM r tJFple {1.875' pig. txxey 2-3q' HES X ¢1.3+'5' piq bare] T x 2-,W Balker'Gr Ret dual prr. 1-94Y 10, 2-349' HES xwmppie {1.876 pig. bane} 1.791' No-Go Tt bMg tail , WLEG Perforation Summary x 2-318' Bake TW Ret pMa. EKE 2.41' ID. Stze Spf >nterva (TVD) 2 -3i8' HES XN-Ni ple { 1475 ptg. Lore) - 9R .5 4'$' $ - P o4o 1.711' OR sands 8334,` 8l74' .�25T -4265 u 2-3,r Baker'E` Hydro Trip Sub 45V 5 8532` - & 4.311'- 4333' 6` , nule6t*e pup (bcthom depth; =`C' ai Vii' pk¢bm) Hydro Trip Sub EUT 1.75` t 2521' 7' t•13fltutOn Float 4rliar DST �' E?0_ 7' l- ailbl,rl "n'aoat shoe DATE RE's.'. BY COMMENTS L26W Lee Hiroo Ct11ed cy Dpi 14 MILNE POINT UNIT WELL No_: S48i 302414-3 :?e -%lr Ccrnp*ied ty Dmn 14 API: 50 -029-23133 -00 BP EXPLORATION (AK) r SEAN PARNELL, GOVERNOR ALASKA OIL AND GALS i 333 W. 7th AVENUE, SUITE 100 CONSERVATION COMUSSION ANCHORAGE (90 AL 99501-3539 PHONE 7) 279433 FAX (907) 276-7542 Ms. Kaity Longden Production Engineer BP Exploration (Alaska), Inc. P.O. Box 196612 Anchorage, AK 99519-6612 Re: Milne Point Field, Schrader Bluff Pool, MPS- 18SS Sundry Number: 309-384 -, 82009 Dear Ms. Longden: 5g,,ANNEU D E �-� I Enclosed is the approved Application for Sundry Approval relating to the above referenced well. Please note the conditions of approval set out in the enclosed form. When providing notice for a representative of the Commission to witness any required test, contact the Commission's petroleum field inspector at (907) 659-3607 (pager). As provided in AS 31.05.080, within 20 days after written notice of this decision, or such further time as the Commission grants for good cause shown, a person affected by it may file with the Commission an application for rehearing. A request for rehearing is considered timely if it is received by 4:30 PM on the 23rd day following the date of this letter, or the next working day if the 23rd day falls on a holiday or weekend. A person may not appeal a Commission decision to Superior Court unless rehearing has been requested. Sincerely, n Jon rma L . ommissin7err DATED thi30day of November, 2009 Encl. -�� STATE OF ALASKA ECGI f D 11� ALASOOIL AND GAS CONSERVATION COMMIS APPLICATION FOR SUNDRY APPROVALS ®`� i �ao� 20 AAC 25.280 1. Type of Request: Abandon ❑ Suspend ❑ Operational shutdown ❑ Perforate ❑ Re - Te r uspen cre II 0 Alter casing ❑ Repair well ❑ Plug Perforations ❑ Stimulate ❑ Other 2 - Speci n Repair Change approved program ❑ Pull Tubing ❑ Perforate New Pool ❑ Time Extension ❑ 2. Operator Name: 4. Current Well Class: 5. Permit to Drill Number: BP Exploration (Alaska), Inc. Development ❑ Exploratory ❑ 202 -2420 ` 3. Address: P.O. Box 196612 Stratigraphic ❑ Service 0 6. API Number:; ` Anchorage, AK 99519 -6612 50- 029 - 2313300 (t ^7 u 7. If perforating, closest approach in pool(s) opened by this operation to nearest 8. Well Name and Number: property line where ownership or landownership changes: Spacing Exception Required? Yes ❑ No ❑ MPS -18SS 9. Property Designation (Lease Number): 10. Field / Pool(s): ADLO- 380109 • Milne Point Field / Schrader Bluff Pool 11. PRESENT WELL CONDITION SUMMARY Total Depth MD (ft): Total Depth TVD (ft): Effective Depth MD (ft): Effective Depth TVD (ft): Plugs (measured): Junk (measured): 8704 4453.74 1 8621 4391.74 NONE NONE Casing Length Size MD TVD Burst Collapse Structural Conductor 112 20" 92# 215# A -53 Surface 112 Surface 112 Surface 2940 9 -5/8" 40# L -80 35 2940 35 2257 5750 3090 Intermediate 8704 7" 26# N -80 32 8704 32 4454 1 7240 5410 Production Liner Perforation Depth MD (ft): Perforation Depth TVD (ft): Tubing Size: LS 2 -3/8" 4.6# Tubing Grade: L -80 Tubing MD (ft): Surface -8503' see attached - - SS 2 -3/8" 4.7# L -80 Surface - 8433' Packers and SSSV TVDe: 7 "X2 -3/8" Baker "GT' Ret dual PKR Packers and SSSV MD and TVD fft): 8407' 4238' 7 "X2 -3/8" Baker "FH' Ret PKR 8482' 4290' 12. Attachments: Description Summary of Proposal 13. Well Class after proposed work: Detailed Operations Program ❑ BOP Sketch ❑ Exploratory ❑ Development ❑ Service Q 14. Estimated Date for 15. Well Status after proposed work: Commencing Operations: 11/30/2009 Oil ❑ Gas ❑ WDSPL ❑ Plugged ❑ 16. Verbal Approval: Date: WINJ ❑Q GINJ ❑ WAG ❑ Abandoned ❑ Commission Representative: GSTOR ❑ SPLUG ❑ 17. 1 hereby certify that the foregoing is true and correct to the best of my knowledge. Contact Kaity Longden Printed Name Kaity Longden Title P.E. Signature Phone Date 564 -5554 11/16/2009 Prepared by Gary Preble 564 -4944 COMMISSION USE ONLY Conditions of approval: Notify Commission so that a representative may witness Sundry Number: 30 Plug Integrity ❑ BOP Test ❑ Mechanical Integrity Test ❑ Location Clearance ❑ Other: Subsequent Form Required: / D • ! O ` APPROVED BY Approved by: CO SIONER THE COMMISSION Date: N A LA «����� Form 10-403 Revised 07/2009 Submit in Duplicate MPS- 18SS /LS 202 -242 PERF ATTACHMENT Sw Name Operation Date Perf Operation Code Meas Depth Top Meas Depth Base Tvd Depth Top Tvd Depth Base MPS -18LS 3/22/03 PER 8,512. 8,542. 4,311.2 4,333.15 MPS -18SS 3/22/03 PER 8,434. 8,474. 4,256.12 4,283.87 AB ABANDONED PER PERF APF ADD PERF RPF REPERF BPP BRIDGE PLUG PULLED SL SLOTTED LINER BPS BRIDGE PLUG SET SPR SAND PLUG REMOVED FCO FILL CLEAN OUT SPS SAND PLUG SET • FIL FILL I SQF SQUEEZE FAILED MIR MECHANICAL ISOLATED REMOVED SQZ SQUEEZE MIS MECHANICAL ISOLATED STC STRADDLE PACK, CLOSED MLK MECHANICAL LEAK STO STRADDLE PACK, OPEN OH OPEN HOLE • bp 0 To: Mark O'Malley /Jerry Sharp Date: November 13, 2009 MPU Well Operations Supervisor From: Kaity Longden, MPU Schrader -E Pad Engineer Jack Lau, Wells Engineer Subject: MPS -18SS Gel Job Step Unit Operation 1 O Shut in all offset producers and other injector string. Bullhead water into MPS - 18SS. 2 O Bullhead gel treatment down MPS -18SS. Keep well and offset producers shut in for minimum of 2 days and flow producers to a tank before returning to production. OBJECTIVE 1. Divert water by sealing the preferential path of injection with a rigid gel. Measure of success 1. Gel treatments are fully displaced into formation. 2. Post injection is adequate to achieve injection rate target at below target pressure. 3. Decrease of watercut over time in offset producers is seen. CRITICAL ISSUES • Ensure pumping pressure is not above the fracture gradient. • Ensure cleanliness of pump equipment and hard line (pre and post job) & properly dispose of remnant gel per guidance from the Environmental Team. PROCEDURE Stagel. Injection Test 1. RU, hold pre -job safety meeting, PT surface lines 2. Ensure other injector string and offset producers are SI 3. Spear in with Methanol, followed by produced water. Attempt to hold injection rate constant while adjusting pressure as needed. n Once consensus is 4. Contact Engineering to discuss the injection pressure/rate trends. O 9 9 J p achieved that the fluid can be successfully placed into formation at acceptable rate /pressure continue with remainder of program. Stage 2. High Volume Gel Treatment 5. Ensure other injector string and offset producers are off line 6. Pump produced water preflush, followed by gel treatment and produced water over flush, then freeze protect. 7. Capture a gel sample at surface and suspend in a warm water bath (to simulate downhole conditions) to monitor actual setting time. 8. Rig down all equipment and hold post -job assessment meeting to capture learnings to be incorporated into future jobs. 9. Forward all post job assessments (w/ all rheology test summary) and continuous pressure and rate data from job to Pad Engineer. Dual StitrKj C =S'�g 1Y1r U S 8� �9 KB Eley. - 72.00 titan thnBad 2 IF EUE hap and 113' bay" : ; 0"9. GL Eler. - 38.40 2' 0 u H EP'J pralle NOW N DOWN k IMded cm :X x 34 ;isalted. 2.1 P;r A � emsrpsnoy � 9 S-a3' Ala , L 60 IEir idnR ID - B-679 :nP - ," WE uFS1 ?:g Long String Short Strina 32.[9' 2 -3 -B' HEC X- hlppFe 11.975` p(g. Me: ` -a t-ES X - ple t1.8a'S' piq bore) 3074 4 1ax. ^_ae a ,gle - 74 ueg Q 3435' Hole angle 1hru perfs 45 o'=g T 26*, L-M IHT MOD Ca5ng (Wit d - 6.181, cap. -.0333 bpr) 2- 3x9.4.7 #alt ,33, 3T Uting (*tilt - 1.901, Cap. - .0 tp", 2 -3.`" �E5 +;- '�I ;1 .3? °•' pdSy. �Cte i f.;yj�' 83 -4' 2 -35 HES X- tipple {1. "ti p[g. to E; ,° x 2 -318' 8awr'G? Ret dual pv. . 1,2. 1.9da 's0. t21 2 -3'3' -1E-, XN -Nippe ,1 '_73° psg. to-c- ,3. Tubhg Ul , WLEG Perforation Summary ` x 2-&8' Baker 'FFr Ret plc. ?382 2.11` I0. Size Spf nterval rTVD} CA sands 2 -Y3' HES XN-NWe { 1375 paq Carol 4 a'3' S Na 1.711" 8.3:4' - Sd74' 4257.42W x OR sands 2-3 9' 8aker'E' Hydm Tftp Sub d ° +4' _ 5 851_ - ez4z 4311'- 4333 w 6 rmaile6hoe pup (tcM dWthR '1917` bare) Hydra Trip Saab EVAC HallhAon Float OCit3r ;)3Tv a 1.73 ball. 977_ "t ailbLrlcn loaf Shoe A« OA.TE REV. BY CONMEWIS Lam? Fiane C rtled ty Caayar 1 MILNE POINT UNIT WELL No.: S -18i -Re -Ur a CanpelEd ty Doyor 1-1 API : 50-029- 23133-00 BP EXPLORATION (AK) . . MEMORANDUM State of Alaska Alaska Oil and Gas Conservation Commission TO: Jim Regg '[7 ~ 7/ ( P.I. Supervisor I"~ Ii Þ 07 DATE: Monday, July 16,2007 SUBJECT: Mechanical Integrity Tests BP EXPLORATION (ALASKA) fNC S-18 MILNE PT UNIT sa S-18 Src: Inspector J,þ ð- - .'l4- J- Reviewed By: P.I. Suprv .:JBe- Comm FROM: Lou Grimaldi Petroleum Inspector NON-CONFIDENTIAL Well Name: MILNE PT UNIT SB S-18 API Well Number: 50-029-23133-00-00 Inspector Name: Lou Grimaldi Insp Num: mitLG07071418300 I Permit Number: 202-242-0 Inspection Date: 7/14/2007 Rei Insp Num: Packer Depth Pretest Initial 15 Min. 30 Min. 45 Min. 60 Min. Well ! S-18 ¡Type Inj. I W ---,---- TVD 4238 I IA 925 1720 1670 I 1650 I _----1--_ P.T.D 2022420 ITypeTest I SPT Test psi 1720 ! OA 5 5 5 I 5 I I I ~-- i Interval 4YRTST P/F P ./ Tubing 1100 1100 1100 I 875 - ~~-- Notes: .5 barrels pumped, good test. ~o 'l.\j\j1 S~Ne.O JUL Monday, July 16,2007 Page 1 of 1 . . ~. ¡t:::;:-cJ! r'''?~ WELL LOG TRANSMITTAL To: State of Alaska Alaska Oil and Gas Conservation COmIll. Attn.: Librarian 333 West 7th Avenue, Suite 100 Anchorage, Alaska 99501 November 13, 2006 RE: MWD Formation Evaluation Logs: MPK-09, MPS-12_PB1_L1, MPI-13, MPS-18_PBl. The technical data listed below is being submitted herewith. Please address any problems or concerns to the attention of: Rob Kalish, Sperry Drilling Services, 6900 Arctic B~...ð., Â,.lehorage, AK 99518 MPK-09: ÐO-S-- blL./ -tf: /43C¡1f Digital Log Images: SCANNED FEB 0 1 2007 1 CD Rom 50-029-23247-00 MPS-12 PB1 L1: ;;)6"3 -og"3 U /4401 903 -Oéì.Lf if IL/~/Dd. - - ( Digital Log Images: 1 CD Rom 50-029-23133-00, 70, 60 MPI-13: U:t~ eöt -ö-=t7J I:t ·IL{30CJ Digital Log Images: 1 CD Rom 50-029-23012-00 MPS-18_PB1: UIc.. gö"d -8<-fQ ;:t !'-/'-iDO Digital Log Images: 50-029-23133-00, 70 1 CD Rom r '.0 e e WELL LOG TRANSMITIAL To: State of Alaska Alaska Oil and Gas Conservation Comm. Attn.: Howard Okland 333 West ih Avenue, Suite 100 Anchorage, Alaska 99501 February 20,2004 13v/9 RE: MWD Fonnation Evaluation Logs: MPS-18 & MPS-18 PBl, AK-MW-2289288 MPS-18: Digital Log Images: 50-029-23133-00 dD~- c94d- MPS-18 PBl: Digital Log Images: 50-029-23133-70 1 CD Rom 1 CD Rom PLEASE ACKNOWLEDGE RECEIPT BY SIGNING AND RETURNING THE ATTACHED COPIES OF THE TRANSMITTAL LETTER TO THE ATTENTION OF: Speny-Sun Drilling Services Attn: Rob Kalish 6900 Arctic Blvd. Anchorage, Alaska 99518 BP Exploration (Alaska) Inc. Petro-technical Data Center LR2-1 900 E. Benson Blvd. Anchorage, Alaska 99508 ~Date:~ s¡gneðÊ \ ~ãJíii ;-. ~ \I) e e ..........,........................... ... ..~';;:'. .., 1 ',' ,,,.... -,~ .. .<' '~',~ MICROFILMED 07/25/06 DO NOT PLACE ANY NEW MATERIAL UNDER THIS PAGE F:\LaserFicbe\CvrPgs _ Inserts\Microfilm _ Marker.doc J-. Lf ()¡ J-~~ ">- DATA SUBMITTAL COMPLIANCE REPORT 4/1/2005 Permit to Drill 2022420 Well Name/No. MILNE PT UNIT SB S-18 Operator BP EXPLORATION (ALASKA) INC Sp t,J () /==~ M'{3 API No. 50-029-23133-00-00 ---~ MD 8704 TVD Completion Status 4454 Completion Date 3/24/2003 REQUIRED INFORMATION Types Electric or Other Logs Run: Well Log Information: Log/ Data Digital Type Med/Frmt i Rpt ---Asc I I ~- 0 _ Ase I i Rpt Iw 0 f..Eú 0 Asc ------ DATA INFORMATION Lro 0 i J.R) 0 ~ 0 I ~ 0 i Rpt I Rpt I I Rpt i ¿pt5t / 0 Asc i~D i _ - , ED .cr6 t't l.ø Asc ¡ Rpt J Rpt ! Rpt ~ I ¡ L__~___ Mud Log No Samples No 1WINJ CurrentStatus 1WINJ (UlC Y ] .=--- Directional r ~ .J MWD, GR, CCL, ABI, IFRlCASANDRA, GYRO, PWD, SCMT (data taken from Logs Portion of Master Well Data Maint) Electr Dataset Number Name Directional Survey Directional Survey Directional Survey Directional Survey Directional Survey Directional Survey Directional Survey l.t4â'31 ue Vcrific:ltiol1" ~ f.., t UJ Yl-'-'\ Directional Survey Directional Survey Directional Survey LIS Verification Directional Survey ~ vZ, £. LV." v( ~32 LIS Vcrifi...c:\lIon ~ Directional Survey Directional Survey Directional Survey LIS Verification Directional Survey Cement Evaluation Log Log Run Scale Media No final Final Final r'\.ü¡4 2 4 ~~V' final 4 final 2 5 Gol Interval OH/ - Start Stop CH Received Comments 4772 8704 Open 7/1/2003 603 5884 Open 7/1/2003 PB1-MWD 603 5884 Open 4/17/2003 PB1 4772 8704 Open 4/17/2003 MWD 4772 8704 Open 7/1/2003 MWD 603 5884 Open 4/17/2003 PB1 0 603 Open 4/17/2003 PB1 GYRO 42 5853 Open 6/25/2003 PB1 603 5884 Open 4/17/2003 PB1 MWD 4772 8704 Open 4/17/2003 603 5884 Open 4/17/2003 PB1 MWD 42 8666 Open 6/25/2003 -- 0 603 Open 7/1/2003 PB1 - Gyro 42 8666 Open 6/25/2003 4772 8704 Open 4/17/2003 603 5884 Open 7/1/2003 PB1 0 603 Open 4/17/2003 PB1GYRO 42 5853 Open 6/25/2003 PB1 4772 8704 Open 4/17/2003 MWD 150 7086 Case 1 0/1 0/2003 Slim Cement Mapping Tool- SCMT - Primary Depth Control (GR-CCL) DATA SUBMITTAL COMPLIANCE REPORT 4/1/2005 Permit to Drill 2022420 Well Name/No. MILNE PT UNIT SB 5-18 Operator BP EXPLORATION (ALASKA) INC API No. 50-029-23133-00-00 ~ 8704 TVD 4454 Completion Date 3/24/2003 Completion Status 1WINJ Current Status 1WINJ UIC Y r ----- Casing collar locator 5 Col 150 7086 Case 1 0/1 0/2003 Slim Cement Mapping -, og ! Tool- SCMT - Primary Depth Control (GR-CCL) flED C ;p(' t.. t5 12157 LLS Vt!t jfil,,;ätlon 5 q~/l( (. V4 c.Gt-. 150 7086 Case 10/10/2003 LDWG edit of 1 pass ,I I SCMT GR, CCL, TENS !~ ED C Pds 12157 Cement Evaluation 5 150 7086 Case 10/10/2003 Slim Cement Mapping J! Tool- SCMT - Primary I Depth Control (GR-CCL) ~ ED C Pds 12157 Casing collar locator 5 150 7086 Case 1 0/1 0/2003 Slim Cement Mapping ¡ Tool- SCMT - Primary ! Depth Control (GR-CCL) ~-~- Well Cores/Samples Information: Sample Interval Set Name Start Stop Sent Received Number Comments ADDITIONAL INFORM~,N Well Cored? y~ Chips Received? '-V / N Daily History Received? LPN @N Formation Tops Analysis Received? ~ -~--- Comments: ,~/ Compliance Reviewed By: )k Date: Ä}) /l¡; ~ S --- ) 'f , MECHANICAL INTEGRITY REPORT' ':.. WELL NUMBER -~? \--'\"\N.. V6\f'.-~ ""? <:>- \ <t; C~Oë)-d-~d '} :. I G R E L E;. S ~: ø d f.\ '"'\ - O' ~_. ~\'\~\-~ 36. '-\'" 0 ~ OPER & FIELD ::?UD DA!E: : Casing: ," TD: ~lbl{ .MD.. Y'i5~ TVD; :?BTD: <6b d \ HD 4~) TVD Shoe: 1s(C)'-\ MD TVD i DV: ~ ~ MD ·!vl) ~~~LL DATA :':":1e-z:- : ~ ~ Shoe: MD ~ .. ""\'f- Î '!> J. . ~\..H) '1 _ '-1 D~:: g : C' (j I~ P 2. C K e-z:- ~'-\ CK:>":' HD C-- \/""'\ ,,( c:..-na· \ '\. .~ ::ole Size 0 v ~ ~ I-T TVD¡ :-OP : HD ÍS''''''''!>~ TVTI¡ Set at: ~ ~ (ì ""':> Perf's ~~~\ to ~~~'-\ K-5\) ~'-\J :VD . . ~CH..ANIC;'-L INTEGRITY - PART /1 Annulu.s Press Tes t: ~p ~ODO J 15 min \<1. ,Ç" ¡ 30 min \'t." ') . Comments: t-'\ \\ w-~ k~<;,.~J 'v:>,-\ c."ù~\L, Sc~.:t:: '? bo-a) /'" . ~ i i i I \ MECHÞ_?\lICAL INTEGRITY PART /2 ~ '~\~'D\~ \GOE Cement Volumes :.. .Amt. Liner ~~ Csg \~5~ i DV \-.J ~ Cült ·.)'01 to cove:!:' peri s 6 ~() ~() ~ ~ -;;>"2> ~~ \ ~ o~.c::..~t-^....Q""""\-~Ck;' s'-.)~ '\c.. ~" \- ~ <:o-.xi. ~ -\-~ \a f ~e ç- ~ TO Ÿ <::> s.. -\- ¿- \ \·X ~ '-\ Ù Y;; Theoretical Toe ~';:kc¿;.Ç)~ ~f)(ú'i.~ \0"-· 4>0<=10 Cement Bond Log (Yes or No) '\<L~ ; In AOGCC File 't<tS CEL Evaluation, ::one a.Dove perfs '-J't"-{ ('~ ~~ "'<:,.<i;;ö' ~ "O..'l"'«: ~5..~, '(Ie¿ (\...Co.~ <2:. TO C .-t">-\- ~cJ Production Log: Typ~ Evaluation CONCLUSIONS: ?art 11: ~r '\ ~ ~~~"-s\-\C\.~SJ, ? arc: : Z : t-\rì: "> ,~t-c..o... ~. mtyv\ la¡;")-O? . : Scblumberger Alaska Data & Consulting Services 3940 Arctic Blvd, Suite 300 Anchorage, AK 99503-5711 ATTN: Beth Well Job# Log Description Date Blueline D.S. 5-16~ \~q'-lr--c) LDL 09/10/03 1 P2-60 . ) <.{ ,:êQ-f PROD PROFILE WIDEFT 09/13/03 1 H-26 PROD PROFILE 09/17/03 1 E-21A '~5 C>;~~' SBHP SURVEY 09/16/03 1 NK-29 ! ~;r\ c¡ n PROD PROFILE WIDEFT 09/09/03 1 D.S. 3-29 ' ~ '(")7-~ PROD PROFILE WIDEFT 09/19/03 1 D.S.15-18 .. ....(}(f' ., SBHP SURVEY 09/19/03 1 U-08A l~~~~. SBHP SURVEY 09/20/03 1 W-24. LDL 09/23/03 1 D.S. 9-06 \ ~~f¡o)~ PROD PROFILE WIDEFT 09/20/03 1 -D.S.2-08B) ---rf1P) 23375 CH EDIT MCNL 05/31/03 1 d-23A ~ 23373 OH EDIT LWD IMPULSE DATA 04/30/03 W-23A (')3"CF5 { I? 23373 MD VISION RESISTIVITY 04/30/03 1 W-23A 23373 TVD VISION RESISTIVITY 04/30/03 1 W-23A 23373 MD BOREHOLE PROFILE 04/30/03 1 MPS-O~Q3'-JB_T 10624537 CH EDIT SCMT GR (PDC) 08109/03 MPS-02 23435 SCMT 08/09/03 MPS-18V' V.Cf)Ð4~ 10559235 CH EDIT SCMT GR (PDC) 03/03/03 MPS-18 10559235 SCMT 03/03/03 PLEASE ACKNOWLEDGE RECEIPT BY SIGNING AND RETURNING ONE COpy EACH TO: BP Exploration (Alaska) Inc. Petrotectnical Data Center LR2-1 900 E. Benson Blvd. Anchorage, Alaska 99508 ¡f"'" ;;.-r:"~ ::¡-ø i 'i j í"""" ~~ '.:.~ \,'<'3 '. ~:.:- ~ ~, f1 ;J~ Ii ." ~ tbY~¡¡ 11 b~ Date Delivered: 1 () -~...~ ^C- . ',.,."., Ii i "~Þ,l~~' V i - ... AJ8~ka Ci'; &. ~.}J -:.>~{;G. c.ofnmj2~cn ¡)u'1C'¡¡or~~-3 09/30/03 NO. 2981 Company: State of Alaska Alaska Oil & Gas Cons Comm Attn: Lisa Weepie 333 West 7th Ave, Suite 100 Anchorage, AK 99501 Field: Prudhoe Bay Color Prints CD --~~_/ 1 J ~ J.~ 1 ~}6 1 / 81F'Jl (j 2 1 J81'?5 T 2 .--< Schlumberger GeoQuest 3940 Arctic Blvd, Suite 300 Anchorage, AK 99503-5711 ATTN: Beth Received ~t.~OD.>.~ ) MEMORANDUM ) State of Alaska Alaska Oil and Gas Conservation Commission TO: Randy Ruedrich DATE: July 20,2003 Commissioner '7- f'í'Î 1 t1./7.,\tSUBJECT: Mechanical Integrity Test THRU: T~m Mauneer ) (e1¿l BPX P.I. Supervisor MPU S Pad FROM: Chuck Scheve Petroleum Inspector NON· CONFIDENTIAL Packer Depth Pretest Initial 15 Min. 30 Min. Well MPU 8-09 Type Inj. 8 TV.D. 4310 Tubing 1425 1425 1425 1425 Interval I P.T.D. 202-020 Type test P T est psi 1078 Casing 600 2000 1975 1975 P/F E Notes: Initial test Well MPU 8-10 Type Inj. 8 TV.D. 4109 Tubing 1500 1500 1500 1500 Interval I P.T.D. 203-067 Type test P Test psi 1027 Casing 650 2000 1900 1900 P/F E Notes: Initial test Well MPU 8-16 Type Inj. 8 TV.D. 4070 Tubing 1250 1250 1250 1250 Interval I P.T.D. 203-065 Type test P T est psi 1018 Casing 950 2025 1950 1950 P/F E Notes: Initial test Well MPU 8-18 Type Inj. 8 TV.D. 4238 Tubing 1450 1450 1450 1450 Interval I P.T.D. 202-242 Type test P Test psi 1060 Casing 850 2000 1975 1975 P/F E Notes: Initial test Well MPU 8-26 Type Inj. 8 T.V.D. 4089 Tubing 1450 1450 1450 1450 Interval I P.T.D. 203-061 Type test P T est psi 1022 Casing 1400 2500 2475 2475 P/F E Notes: I nitial test Type INJ. Fluid Codes Type Test Interval F = FRESH WATER INJ. M= Annulus Monitoring 1= Initial Test G = GAS INJ. P= Standard Pressure Test 4= Four Year Cycle S = SALTWATER INJ. R= Internal Radioactive Tracer Survey v= Required by Variance N = NOT INJECTING A= Temperature Anomaly Survey W= Test during Workover D= Differential Temperature Test 0= Other (describe in notes) / v ,/' ;/ i/ Test's Details I traveled to BPXs S Pad in the Mime Point Unit and witnessed the initial MIT on the above listed 5 wells that were recently placed on injection. The pretest tubing and casing pressures were observed and found to be stable. The pressure tests were then performed with all wells demonstrating good mechanical integrity. M.I.T.'s performed: §. Attachments: Number of failures: º Total Time during tests: 4 hours cc: MIT report form 5/12/00 L.G. 2003-0720_MIT _MPU_S-26_cs.xls 7/23/2003 ) ) aO~-d-tf~ 1 } ~3?- WELL LOG TRANSMITIAL To: State of Alaska Alaska Oil and Gas Conservation Comm. Attn.: Howard Okland 333 West 7th Avenue, Suite 100 Anchorage, Alaska 99501 June 20, 2003 RE: MWD Fotmation Evaluation Logs MPS-18, AK-MW-2289288 1 LIS fotmatted Disc with verification listing. API#: 50-029-23133-00 PLEASE ACKNOWLEDGE RECEIPT BY SIGNING A COpy OF THE TRANSMITTAL LETTER TO THE ATTENTION OF: Speny-SunDriUing Services Attn: Rob Kalish 6900 Arctic Blvd. ~F~~~~,ef' i:At'~f[:~~¡t~)8 BP Exploration (Alaska) Inc. Petro-technical Data Center LR2-1 900 E. Benson Blvd. Anchorage, Alaska 99649-6612 c;) r: '.\n03 l,¡ I:;) /. I" Signed: I? ~ P':',õßãté: ,;]: ) ) dDd--d.4-~ \ 1 cz,~ \ WELL LOG TRANSMITfAL To: State of Alaska Alaska Oil and Gas Conservation Comm. Attn.: Howard Okland 333 West 7th Avenue, Suite 100 Anchorage, Alaska 99501 June 20, 2003 RE: MWD Formation Evaluation Logs MPS-I8 PBI, AK-MW-2289288 1 LIS formatted Disc with verification listing. ~I#: 50-029-23133-70 PLEASE ACKNOWLEDGE RECEIPT BY SIGNING A COPY OF THE TRANSMITTAL LETTER TO THE ATTENTION OF: Sperry-Sun Drilling Services Attn: Rob Kalish 6900 Arctic Blvd. Ap~~~2~gef:4~~r~··9V5118 BP Exploration (Alaska) Inc. Petro-technical Data Center LR2-1 900 E. Benson Blvd. Anchorage, Alaska 99649-6612 () r ,,::) ~J Signed: .g~ C .f\:::'\t>at~~ I ) State of Alaska Alaska Oil and Gas Conservation Commission TO: Randy Rued rich ffi;t 6íÍ3/; DATE: May 7,2003 Commissioner ~3 \ \;} 07 SUBJECT: Mechanical Integrity Tests THRU: Jim Regg 0 6\ \ J\ NPX P.I. superviso~e-i\l~\ S-pad \' 18i FROM: John H. Spaulding MPU Petroleum Inspector Kuparuk Field NON· CONFIDENTIAL ) MEMORANDUM Packer Depth Pretest Initial 15 Min. 30 Min. Well S-18i Typelnj. F T.V.D. 4238 Tubing 1450 1450 1450 1450 Interval I P.T,D. 202-242 Type test P Test psi 1060 Casing 1125 2000 1980 1950 P/F f Notes: Well Type Inj. T.V.D. Tubing Interval P.T.D. Type test Test psi Casi ng P/F Notes: Well Type Inj. TV.D. Tubing Interval P.T.D. Type test Test psi Casing P/F Notes: Well Type Inj. T.V.D. Tubing Interval P.T.D. Type test T est psi Casing P/F Notes: Well Type Inj. T.V.D. Tubing Interval P.T.D. Type test Test psi Casing P/F Notes: Type INJ. Fluid Codes Type Test Interval F = FRESH WATER INJ. M= Annulus Monitoring 1= Initial Test G = GAS INJ. P= Standard Pressure Test 4= Four Year Cycle S = SALTWATER INJ. R= Internal Radioactive Tracer Survey V= Required by Variance N = NOT INJECTING A= Temperature Anomaly Survey W= Test during Workover D= Differential Temperature Test 0= Other (describe in notes) Test's Details Cold 50/50 :MEOH was used as a test medium possibly allowing for a slight but allowable bleed down. I stayed and ::ýv monitored the well for another 15 min period and the pressure appeared to stabilize. M.I.T.'s performed: 1 Attachments: Number of Failures: º Total Time during tests: .4 cc: MIT report form 5/12/00 L.G. 2003-0507 _MIT _MPU_S-18tJs.xls 6/16/2003 STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMMISSION WELL COMPLETION OR RECOMPLETION REPORT AND LOG ) ) 23. CASING SIZE 1. Status of Well o Oil 0 Gas 0 Suspended [J Abandoned /HI Service 2. Name of Operator BP Exploration (Alaska) Ihc. 3. Address P.O. Box 196612, Anchorage, Alaska 99519-6612 4. Location of well at surface 3312' NSL, 180' WEL, SEC. 12, T12N, RlOE, UM At top of productive interval I 4467' NSL, 1572' WEL, SEC. 01, T12N, R10E, UM X = 564382, Y = 6006402 10. Well Number At total depth 4634' NSL, 1653' WEL, SEC. 01, T12N, Ri0E, UM X = 564299, Y = 6006568 11. Field and Pool 5. Elevation in feet (indicate KB, DF, etc.) 6. Lease Designation and Serial No. Milne Point Unit 1 Schrader Bluff KBE = 73.69' ADL 380109 12. Datr-t'pudded 13. Date T.D. Reached 14. Date Comp., Susp., or Aband. 2~2003 )r 2-24-2003 3-24-2003 17. Total Depth (MD+TVD) 18. Plug Back Depth (MD+TVD) 19. Directional Survey 8704 4454 FT 8621 4392 FT /HI Yes 0 No 22. Type Electric or Other Logs Run MWD , GR , RES, IFRICASANDRA , GYRO, CCL , PWD , SCMT CASING, LINER AND CEMENTING RECORD SETTING DEPTH HOLE Top BOTTOM SIZE Surface 112' 42" 35' 2940 12-1/4" 32' 8704' 8-1/2" '" Classification of Service Well Water Injection 7. Permit Number 202-242 8. API Number 50- 029-23133-00 9. Unit or Lease Name X = 565831, Y = 5999979 Milne Point Unit MPS-18i 15. Water depth, if offshore 16. No. of Completions NI A MSL One 20. Depth where SSSV set 21. Thickness of Permafrost NIA MD 1800' (Approx.) 20" 9-5/8" WT. PER FT. 92# 40# 26# GRADE H-40 L-80 N-80 CEMENTING RECORD 260 sx Arctic Set (Approx.) 680 sx PF 'L', 200 sx Class 'G' 100 sx PF 'E', 175 sx Class 'G' AMOUNT PUllED 7" 24. Perforations open to Production (MD+ TVD of Top and Bottom and interval, size and number) 4-5/8" Gun Diameter, 5 SPF MD TVD MD TVD SIZE 2-3/8",4.7#, L-80, (Short String) 2-3/8", 4.6#, L-80, (Long String) TUBING RECORD DEPTH SET (MD) 8433' 8503' PACKER SET (MD) 8407' 8482' 25. 8434' - 8474' 8512' - 8542' 4257' - 4285' 4311' - 4333' . ~ ':.~-¡::i Ó:I~~-'~'~: " : .~),·:~TF :~ i 3.--2il~_Q.3; ,1"(:;l?kl~ ~ ¡:~'-'~:~-;':7} )~~~~' .,., v';;~l: ~'$ ~J:¡. . " ;.,".:.! '"' m~ ;'~".~ - ~~' ~ S1Jt~. .. ~~1~': !.,,::-·,:;f~J 26. ACID, FRACTURE, CEMENT SQUEEZE, ETC. DEPTH INTERVAL (MD) AMOUNT & KIND OF MATERIAL USED 1300' Freeze Protected with 75 Bbls of Diesel 27. Date First Production April 15, 2003 Date of Test Hours Tested PRODUCTION TEST Method of Operation (Flowing, gas lift, etc.) Water Injection PRODUCTION FOR Oll-BBl GAs-McF WATER-BBl TEST PERIOD CHOKE SIZE GAS-Oil RATIO Flow Tubing Casing Pressure CALCULATED Press. 24-HoUR RATE 28. CORE DATA Brief description of lithology, porosity, fractures, apparent dips and presence of oil, gas or water. SUbm~~~1:: I VE 0 Oll-BBl GAs-McF WATER-BBl Oil GRAVITY-API (CORR) No core samples were taken. APR 3 0 2003 QRlG NA. Alaska Oil & Gas Cons. Commission Anchorage RBDMS BFl (iF, MA't , 1003 Form 10-407 Rev. 07-01-80 Submit In Duplicate ) ') 29. Marker Name Geologic Markers Measured Depth 30. Formation Tests True Vertical Depth Include interval tested, pressure data, all fluids recovered and gravity, GOR, and time of each phase. Top of Ugnu Zone C Top of Ugnu Zone B Top of Ugnu Zone BLower SBF2-NA SBF21 SBF24-MF SBF1-NB SBF1-NBR SBF12 SBE4-NC SBE41 SBE2-NE SBE1-NF TSBD-OA TSBC TSBB-OB SBA5 7142' 7623' 7782' 8195' 8203' 8234' 8243' 8256' 8280' 8292' 8298' 8328' 8394' 8433' 8474' 8509' 8544' 3734' 3894' 3944' 4112' 4116' 4132' 4138' 4145' 4159' 4166' 4169' 4188' 4229' 4255' 4284' 4309' 4335' RECEIVED APR 3 0 2003 Alaska Oil & Gas Cons Comm· . . '88,on Anchorage 31. List of Attachments: Summary of Daily Drilling Reports, Surveys and a Leak-Off Test Summary. 32. I hereby certify that the foregoing is true a~d correct to the best of my knowledge Signed Title Technical Assistant Date DL1-3D-()3 MPS-18i Well Number Prepared By Name/Number: Drilling Engineer: Sandra Stewman, 564-4750 Matt Green, 564-5581 Permit No. / Approval No. INSTRUCTIONS GENERAL: This form is designed for submitting a complete and correct well completion report and log on all types of lands and leases in Alaska. ITEM 1: Classification of Service Wells: Gas injection, water injection, steam injection, air injection, salt water disposal, water supply for injection, observation, injection for in-situ combustion. ITEM 5: Indicate which elevation is used as reference (where not otherwise shown) for depth measurements given in other spaces on this form and in any attachments. ITEM 16 AND 24: If this well is completed for separate production from more than one interval (multiple completion), so state in item 16, and in item 24 show the producing intervals for only the interval reported in item 27. Submit a separate form for each additional interval to be separately produced, showing the data pertinent to such interval. ITEM 21: Indicate whether from ground level (GL) or other elevation (OF, KS, etc.). ITEM 23: Attached supplemental records for this well should show the details of any multiple stage cementing and the location of the cementing tool. "'"EM 27: Method of Operation: Flowing, Gas Lift, Rod Pump, Hydraulic Pump, Submersible, Water Injection, Gas Injection, Shut-In, Other-explain. ITEM 28: If no cores taken, indicate 'none'. Form 10-407 Rev. 07-01-80 Of<¡Gjf~AL ') ) BP EXPLORATION QperationsSum mary Report Page 1 of 7 Legal Well Name: Common Well Name: Event Name: Contractor Name: Rig Name: MPS-18 MPS-18 DRILL +COMPLETE DOYON DRILLING INC. DOYON 14 Start: 2/16/2003 Rig Release: 3/24/2003 Rig Number: 14 Spud Date: 2/17/2003 End: 3/24/2003 Date From - To Hours Task Code NPT Phase Description of Operations 2/16/2003 09:00 - 10:30 1.50 MOB P PRE Move rig and jack floor into drilling position, spot rockwasher 10:30 - 13:00 2.50 RIGU P PRE Rig up floor, police rig, (rig accept @ 1300 hrs 2/16/2003) 13:00 - 15:00 2.00 RIGU P PRE Install flow line, NIU hydrill and riser, mixing spud mud 15:00 - 16:00 1.00 RIGU P PRE Rig up floor to pick up pipe 16:00 - 20:30 4.50 DRILL P SURF Pick up 51 stands of 4" HT-38 20:30 - 21 :00 0.50 RIGU P PRE Function test Diverter (witness of test was waiver by John Crisp AOGCC) 21 :00 - 21 :30 0.50 DRILL P SURF Pre-spud meeting, with crews 21 :30 - 23:30 2.00 DRILL P SURF Picking up bit and motor, mwd 23:30 - 00:00 0.50 RIGU P PRE Fill hole with water, check for leaks, rig up slickline 2/17/2003 00:00 - 00:00 24.00 DRILL P SURF Spud well, @ 00:01 2/17/2003, Directional Drill from 112' to 2235' , running gyros 200' to 800', Kick-off @ 222' Pumping with 480 gpm at 2500 psi 80 rpm.,bit wt 25-40K, TQ 9,000, P/U 105K, S/O 90K, R/T 95K, ART 5, AST 10.5 2/18/2003 00:00 - 04:30 4.50 DRILL P SURF Directional Drill from 2235' to 2950' TD 12 114 hole section , Pumping with 480 gpm at 2500 psi 80 rpm. 04:30 - 06:00 1.50 CASE P SURF Circ, two bottoms, with 500 gals min. 2500 psi 100 rpms 06:00 - 08:30 2.50 CASE P SURF Pump out of Hole @ 450 to 480 GPM. to HWDP. RIH, Wash past ledge @ 1777'. 08:30 - 10:00 1.50 CASE P SURF Circ. & Condo Mud - Clean Hole wi 500 GPM. Rotate @ 100 RPM while recirocating Pipe. Big pieces of Coal Lignite over shakers. 10:00 - 12:00 2.00 CASE P SURF Pump out of Hole to HWDP. Stand back same. 12:00 - 14:30 2.50 CASE P SURF Flush & LID BHA. 14:30 - 16:00 1.50 CASE P SURF Rig Up to run 9 5/8" surface Casing. PJSM with all hands. 16:00 - 19:30 3.50 CASE P SURF Run 70 jts. 95/8",40#, L-80, BTC Casing wi Shoe @ 2940'. M/U Hanger& land casing. RID Franks tool & RIU Cement Head. 19:30 - 21 :30 2.00 CEMT P SURF Circulate & Condition Mud & Hole for Cement Job. Viscosity < 50. PJSM with HOWCO, Peak & Rig Crew. 21 :30 - 00:00 2.50 CEMT P SURF Switch to HOWCO. Pump 10 Bbls Water & Test Lines to 3500 psi. Pump additional 40 Bbls water & drop bottom plug. Mix & Pump 20 Bbls ALPHA Spacer @ 10.0 ppg. with 1 Gal Red Dye mixed in the 1 st. 5 Bbls of spacer. Mix & pump 477 Bbls, 10.7 ppg. Type "L" Cement. Saw Red dye in returns & switched to Tail Slurry. Pumped 41 Bbls., 15.8 ppg. "G" Slurry. Drop Top plug & chase wi 30 Bbls of Water from HOWCO. Switch to Rig Pumps and complete dispacement wi 187 Bbls. Mud. Bumped plug wi 1500 psi. +1-190 Bbls Good 10.7 ppg. Cement to Surface. Full I 100 % Returns Throughout Job. 2/19/2003 00:00 - 02:00 2.00 CASE P SURF RID Cement Head, Lay Down Landing Jt. & Casing Tools. 02:00 - 03:30 1.50 CASE P SURF Flush Diverter and Equipment - RID Same. 03:30 - 04:30 1.00 CASE P SURF N/U FMC Gen 5 20" Slip on X 11" 5K Casing Head & 11", 5K Tubing Spool. Test Metal to Metal Seal to 1000 psi. 04:30 - 07:30 3.00 CASE P SURF NIU 135/8",5000 psi. BOP, Lines & related Equipment. 07:30 - 08:00 0.50 BOPSURP SURF Rig up to test BOPE. 08:00 - 11 :00 3.00 BOPSURP SURF Test BOPE: 250 psi. - Low, 3500 psi. - High, Annular to 2500 psi. All Tests 5 minutes. No Failures. Witness waived by John Crisp, AOGCC. 11 :00 - 11 :30 0.50 BOPSUR P SURF RID Test Jt. and Test Equip. Install Wear Bushing. 11 :30 - 14:00 2.50 CASE P SURF M/U 8 1/2" BHA w 1.22 Deg Bent Housing. Surface test MWD. LWD consists of GR I RES + PWD. 14:00 - 14:30 0.50 CASE P SURF RIH to 2800'. Printed: 3/31/2003 11 :00:04 AM ') ') BP EXPLORATION Op.erations Summary Report Page 2 of 7 Legal Well Name: Common Well Name: Event Name: Contractor Name: Rig Name: MPS-18 MPS-18 DRILL +COMPLETE DOYON DRILLING INC. DOYON 14 Start: 2/16/2003 Rig Release: 3/24/2003 Rig Number: 14 Spud Date: 2/17/2003 End: 3/24/2003 Date From·- To Hours Task Code NPT Phase Description of Operations 2/19/2003 14:30 - 15:30 1.00 CASE P SURF R/U Test Equip. & Test 9 5/8" Casing to 2500 psi., Chart for 30 minutes. 15:30 - 16:30 1.00 CASE P SURF Slip & Cut Drilling Line & Service Top Drive. 16:30 - 18:00 1.50 CASE P SURF Drill Cement, Float Collar, Float Shoe & 20' of New Hole to 2970' 18:00 - 18:30 0.50 CASE P SURF Circulate Wellbore Clean 18:30 - 19:00 0.50 CASE P SURF Perform Formation Integerty Test to 11.6 ppg EMW. 8.8 ppg Mud wt. and 330 psi Surface Pressure @ 2258 TVD. 19:00 - 00:00 5.00 DRILL P INT1 Directional Drill from 2970' to 4265'. 550 GPM @ 2950 psi. P/U = 11 OK, SIO = 80K, ROT = 92K. Tq on = 7K. Rot @ 120 RPM. Lo/Hi sweeps every Third Stand Drilled. 2120/2003 00:00 - 05:45 5.75 DRILL P INT1 Directional Drill from 4255' to 5884' - 550 GPM @3680 psi. Torque on bottom 7K. ECD Ranged from 9.5 ppg ( Initial Clean Hole) to an average of 10.6 ppg. Spikes after sweeps went up to 12 ppg. P/U = 11 OK, SIO = 80K, Rot = 95K ART = 2.7 Hrs. AST = 0.3 Hrs. Packed Off @ 5855' while backreaming stand after drilling down to 5884'. Driller cut pumps & pulled up tight. Rotary stalled. 05:45 - 10:00 4.25 DRILL N STUC INT1 Jar Down on stuck Pipe. Slacked off all string weight and torqued pipe to 20 K to get very light hit wI Jars. No Movement - No Circulation 10:00 - 12:00 2.00 DRILL N STUC INT1 Jarred Upward, pulling incrementally up to 450K ( 80% of new pipe yield + Top Drive) while applying 800 psi Down drill string. No Movement. 12:00 - 17:00 5.00 DRILL N STUC INT1 Wait on SWS. Jar on stuck pipe wI 200K to 225K Up stroke to insure HWDP remains free. 17:00 - 00:00 7.00 DRILL N STUC INT1 PJSM wI SWS on Collider Cutting Tool and Pump in I Pack off Assembly. R/U and make First run with Cutter on .39" E-Line. Hung up 2 2740',2870', and finally stooped @ 2900'. Applied 800 psi. unable to move down. POH wI Tool. Rehead Smaller E-Line (0.23") and add two Rollers to Cutting Tool Assy. 2/21/2003 00:00 - 04:00 4.00 DRILL. N STUC INT1 Make 2 nd. Run - Unable to pass 2900'. Pump through pipe into formation wI 1 BPM @ 1060 psi. No Movement. Pack Off design would not release E-Line down at this pressure. POH wI tool & RID Pack off system. SWS delivered Grease Injector Lubricator system. 04:00 - 08:00 4.00 DRILL N STUC INT1 R/U Lubricator & Cutter Tool. RIH to 2700'. Had to pump down cutter pumping 3 BPM @ 1200 psi. while flexing string. Pumped down to 5700' (140 Bbls Mud to Formation). Correlated wI CCl. Put cutter on depth @ 5640'. Pulled 250K tension on String. 08:00 - 09:30 1.50 DRILL N STUC INT1 Fired cutter. String not free but had immediate Circulation. Circulated Bottoms Up 84 gpm @ 240 psi. POH wI E-Line & Cutter. RID SWS Tools & Equipment. 09:30 - 11 :00 1.50 DRilL N STUC INT1 Jarred up & pulled String Free. Circulated Hole Clean @ 550 GPM & 1700 psi. with 120 RPM. 11 :00 - 11 :30 0.50 DRILL N STUC INT1 Performed Derrick Inspection - Found No Damge form Jarring 11 :30 - 14:00 2.50 DRILL N STUC INT1 POH wI DP. 14:00 - 14:30 0.50 DRILL N STUC INT1 Stand Back HWDP. UD Jars. Recover Cut Jt. - 30' long. Printed: 3/31/2003 11 :00:04 AM ') ) BP EXPLORATION Operations Summary Re.port Page 3 of 7 Legal Well Name: Common Well Name: Event Name: Contractor Name: Rig Name: MPS-18 MPS-18 DRILL +COMPLETE DOYON DRILLING INC. DOYON 14 Start: 2/16/2003 Rig Release: 3/24/2003 Rig Number: 14 Spud Date: 2/17/2003 End: 3/24/2003 Date From - To Hours Task Code· NPT Phase Description of Operations 2/21/2003 14:00 - 14:30 0.50 DRILL N STUC INT1 TOF @ 5640'. 14:30 - 16:30 2.00 DRILL N STUC INT1 Change out Top Drive Saver Sub. 16:30 -19:00 2.50 DRILL N STUC INT1 M/U Side Track BHA wi MX-C1 Bit, 1.5 Deg. Motor & GR/RES/PWD. Surface Test MWD. 19:00 - 19:30 0.50 DRILL N STUC INT1 RIH to 2928'. 19:30 - 20:30 1.00 DRILL N STUC INT1 CBU 1.5 Times wi 500GPM @ 2350 psi. Rotate & Reciprocate Pipe. Establish Clean Hole Baseline ECD = 9.6 ppg. 20:30 - 22:00 1.50 DRILL N STUC INT1 Slip & Cut Drilling Line & Service Top Drive. 22:00 - 23:00 1.00 DRILL N STUC INT1 RIH to 3313' - Taking Weight. Ream from 3313' to 3887' wi 80 RPM, 450 GPM @ 2000 psi. ECD @ 10.8 ppg. 23:00 - 23:30 0.50 DRILL N STUC INT1 Circulate Hi Vis Sweep. ECD = 9.8 ppg 23:30 - 00:00 0.50 DRILL N STUC INT1 Continue Reaming Old Hole to 4269' - No Problems. 2/22/2003 00:00 - 01 :00 1.00 DRILL N STUC INT1 Continue to Ream Old Hole from 4269' to 4800' - 450 Gpm @ 2250 psi. ECD = 10.3 ppg. 01 :00 - 01 :30 0.50 DRILL N STUC INT1 CBU @ 4800'.450 GPM I 2250 psi. ECD = 9.8 ppg. 01 :30 - 03:00 1.50 DRILL N STUC INT1 Sidetrack Lowside of Hole. Time I Sliding from 4800' to 4840' 03:00 - 08:00 5.00 DRILL N STUC INT1 Directional Drill from 4840' to 5885'.485 GPM @ 2770 psi. Torque = 9 K. 30K - WOB, 80 RPM, P/U = 145K SIO = 80K ROT = 100K. Precautionary Hi - Vis sweep every 5 Stands. ECD's Holding in low 10's. 08:00 - 20:00 12.00 DRILL P INT1 Directional Drill from 5885' to 7461'. 496 GPM @ 3200 psi. Torue = 10K 30K WOB, 80 RPM. P/U = 167K, SIO = 77K ROT = 108K. Precautionary Hi - Vis Sweep every 5 Stands. ECD's still holding in Low 10's. Daily AST = 2.02 HRS. ART = 8.52 Hrs. 20:00 - 21 :30 1.50 DRILL P INT1 CBU 3 times in conjunction with a LolHi Vis Sweep. Rotating @ 100 RPM & 500 GPM on the up stk. I 100 RPM & 390 GPM on the down stk. Final ECD = 10.2 ppg. Calculated ECD = 9.73 ppg. 21 :30 - 00:00 2.50 DRILL P INT1 Pump out of the Hole to 5000'. Pumping 500 GPM I 2800 psi. to 2500 psi. No Problems. 2/23/2003 00:00 - 01 :00 1.00 DRILL P INT1 Continue Pumping out of the Hole to 4500'. POH without pumps to 2926'. No Problems - Hole in good shape. 01 :00 - 01 :30 0.50 DRILL P INT1 Lubricate Rig I Service Top Drive. 01 :30 - 03:00 1.50 DRILL P INT1 RIH to 4756'. Orient Motor to Low side & Slide into new Hole. Continue RIH to 7326' 03:00 - 03:30 0.50 DRILL P INT1 Precautionary Ream to Bottom @ 7461' while circulating a Hi I Vis Sweep. 03:30 - 06:00 2.50 DRILL P INT1 Directional Drill from 7461' to 7714'.500 GPM @ 3400 psi. Torque = 10K, 30 to 35K WOB, 80 RPM, ECD = 10.26 ppg. P/U = 175K, SIO = 80K, ROT = 105K 06:00 - 13:30 7.50 DRILL N RREP INT1 Discoverd washout in union on gooseneck atop standpipe. Mobilized work basket, PJSM wi all Hands. Sent Welder & team aloft. Repaired leak. Circulated through pump-in sub & cement hose and rotated string in slips while repairing leak. 13:30 - 18:30 5.00 DRILL P INT1 Directional Drill from 7714' to 8182'.500 GPM @ 3620 psi. Printed: 3/31/2003 11 :00:04 AM ) ') BP EXPLORATION Operations Summary Report Page 4 of 7 Legal Well Name: Common Well Name: Event Name: Contractor Name: Rig Name: MPS-18 MPS-18 DRILL +COMPLETE DOYON DRILLING INC. DOYON 14 Start: 2/16/2003 Rig Release: 3/24/2003 Rig Number: 14 Spud Date: 2/17/2003 End: 3/24/2003 . Date From... To Hours Task Code NPT Phase Description of Operations 2/23/2003 13:30 - 18:30 5.00 DRILL P INT1 Torque = 10K, 10 to 35K WOB, 80 RPM ECD = 10.02 ppg. P/U = 180K, SIO = 78K, ROT = 11 OK 18:30 - 21 :30 3.00 DRILL N RREP INT1 Same union as above - initial weld leaking. PJSM wI all Hands. Welder and helper repaired leak. Circulated Through pump- in sub as before. Different aloft work configuration enabled reciprocation of string. 21 :30 - 00:00 2.50 DRILL P INT1 Directional Drill from 8182' to 8285'. 500 GPM @ 3130 psi. Torque = 10K, 20 to 35K WOB, 80 RPM, ECD = 9.92 ppg. P/U = 165 K, SIO = 80K, ROT = 113K Daily AST = 2 Hrs. Daily ART = 5.75 Hrs. Throughout day: Pumped precautionary HiNis Sweep every 5 Stands. 2/24/2003 00:00 - 07:00 7.00 DRILL P INT1 Directional Drill from 8285' TO 8628'.500 GPM @ 3600 psi. Torque = 12K, WOB = 20 to 40K, 80 RPM, ECD = 9.95 ppg. P/U = 175K, SIO = 90K, ROT = 105K AST = 2.5 Hrs. ART = 3.5 Hrs. ROP dropped to less than 10Ft. per Hr. below OB Sand. 07:00 - 08:30 1.50 DRILL P INT1 Circulate 3 Bottoms Up in conjunction wI Hi - Vis Sweep. 08:30 - 11 :30 3.00 DRILL P INT1 Pump out of Hole to 7500'. POH dry to HWDP. 11 :30 - 14:00 2.50 DRILL P INT1 POH standing back BHA. CIO Bit, Down Load then Up Load MWD, Adjust Motor from 1.5 Deg to 1.22 Deg. Orient MWD, RIH wI HWDP & Surface test MWD. 14:00 - 15:00 1.00 DRILL P INT1 RIH to 2929' 15:00 - 16:00 1.00 DRILL P INT1 Slip & Cut Drilling Line. Service Top Drive. 16:00 - 17:00 1.00 DRILL P INT1 RIH to 4746'. 17:00 - 17:30 0.50 DRILL P INT1 Orient Motor & Slide into New Hole. 17:30 - 18:30 1.00 DRILL P INT1 RIH to 8538'. Precautionary wash last stand to 8628' - No Fill 18:30 - 19:30 1.00 DRILL P INT1 Drill from 8628' to 8704' - TD. 500 GPM @ 3600 psi Torque = 13K, WOB = 30K, 120 RPM, ECD = 9.97 ppg P/U = 200K, SIO = 80K, ROT = 120K All Rotate = 0.5 Hrs. 19:30 - 22:30 3.00 CASE P INT1 Circulate I Condition Mud & Clean Hole Pump Hi - Vis Sweep. Final ECD = 9.74 ppg. 22:30 - 00:00 1.50 CASE P INT1 Flow Check. Pump Dry Job. POH Standing back DP to 6300'. 2/25/2003 00:00 - 04:00 4.00 CASE P INT1 LID 4" DP 04:00 - 06:00 2.00 CASE P INT1 Stand Back HWDP & LID BHA. 06:00 - 07:30 1.50 CASE P INT1 Pull WIR, Install Test Plug, CIO Top Rams to 7" Casing. Test Bonnet Seals to 1500 psi. 07:30 - 09:00 1.50 CASE P INT1 PJSM. Rig up to Run Casing. 09:00 - 11 :30 2.50 CASE P INT1 M/U Float Jts. Pump through & Check. Run 7" Casing to 2849'. 11:30 -12:00 0.50 CASE P INT1 Circulate Mud @ Shoe. 12:00 - 19:30 7.50 CASE P INT1 Run 7" 26#, L-80, BTC-MOD Casing to 7175'. Few Bbls short on displacement. Mud returns very thick. Broke Circ & Circ 3 Jts. Down wI 125 GPM & 500 psi. 100% returns. Continue RIH to 8704' with proper displacement. Total 212 Jts Run. 19:30 - 20:00 0.50 CASE P INT1 Circulate Bottoms up wI Fill-Up Tool. Reciprocate Casing. P/U = 250K, SIO = 80K. 100 % Returns. 20:00 - 20:30 0.50 CASE P INT1 Remove Fill-Up Tool & R/U Cement Head. 20:30 - 23:00 2.50 CASE P INT1 Circulate & Condition Mud for Cement Job While Reciprocating Casing. Final Circ Rate of 220 GPM @ 550 psi. Mud - 9.15 ppg, Vis = 39, YP = 9. 23:00 - 00:00 1.00 CASE P INT1 Give to Halliburton, Pump cement job with Hallibuton as Printed: 3/31/2003 11 :00:04 AM -\ ,I ) BP EXPLORATION Operations Summary Report Page 5 of 7 Legal Well Name: Common Well Name: Event Name: Contractor Name: Rig Name: MPS-18 MPS-18 DRILL +COMPLETE DOYON DRILLING INC. DOYON 14 Start: 2/16/2003 Rig Release: 3/24/2003 Rig Number: 14 Spud Date: 2/17/2003 End: 3/24/2003 Task CodeNPT Phase Description of Operations 2/25/2003 23:00 - 00:00 1.00 CASE P INT1 follows: - Continued reciprocating casing throughout Job 5 Bbls Water Test lines to 3500 psi. 15 Bbls Water 30 Bbls ALPHA Spacer @ 10.2 ppg. Drop Bottom Plug 100 SX, 38 Bbls., Class "E" @ 12.0 ppg, Yield 2.17 cu ft/ Sx 175 SX, 38 Bbls, Class "G", @ 15.6 ppg., Yield 1.22 cu ft I Sx with 3% Kcl + 2% Cal Seal + 0.5% Lap-1 Wash out Cement line to Floor Drop Top Plug Displace wI HES Pumps - Pumped 130 Bbls 9.7 ppg NaCI Brine at Report Time. Pressure @ Floor = 520 psi. Full Returns 2/26/2003 00:00 - 00:30 0.50 CASE P INT1 Complete Displacing Cement with total of 327 Bbls, 9.7 ppg NaCI Brine. Slowed pumps to 3 Bbl I min for last 5 Bbls. - pressure 810 psi. Bumped plug with 1800 psi. Bled off to HES to check floats - OK. 00:30 - 01 :00 0.50 CASE P INT1 RID Cement Head. Drain Stack. 01 :00 - 03:30 2.50 CASE P INT1 P/U BOP & Set Emergency Slips with 175K Lbs. Tension on Csg. M/U Hydril tbg and Adapter. Blow Casing dry to 60'. Cut & Dress 7" Csg as per FMC Rep. 03:30 - 05:00 1.50 RIGD P COMP Set Pack off & N/U Tbg. Head. Test Pack off to 3800 psi. (70% of Collapse) for 10 minutes. 05:00 - 06:30 1.50 RIGD P COMP Change Top Pipe Rams back to 27/8" X 5" Variables. N/D BOPE. M/U Tbg Hgr + 1 Jt 4.5" Tbg wI WLEG, N/U adapter Flange & 4 1/16" Master Valve 06:30 - 08:30 2.00 RIGD P COMP Freeze Protect 9 5/8" X 7" Annulus to 2165' MD wI 60 Bbls Diesel. Final rate = 2 BPM @ 1300 psi. 08:30 - 10:00 1.50 RIGD P COMP Test Adapter Flange & Master Valve to 5000 psi. Complete cleaning out pits & cellar. RIG RELEASED @ 10:00 HRS. 2/26/2003 3/21/2003 07:00 - 08:00 1.00 MOB P COMP RID, slide Rig Floor to Move Position 08:00 - 09:30 1.50 MOB P COMP Move Rig off MPS-20i & Spot over MPS-18i. 09:30 - 12:00 2.50 MOB P COMP Slide Rig Floor into Operating Position, Rig Up. Rig Accepted @ 12:00 Hrs. 12:00 - 13:30 1.50 RIGU P COMP N/D 7" Master Valve, Remove 7" X 11" False Bowl. Make Dummy run wI Dual Hanger. Mark Landing Joints. RT toTbg Head LDS = 30.00 Ft. New Crew on Location - 30 Minute safety Meeting. 13:30 - 16:30 3.00 RIGU P COMP N/U 135/8",5000 psi. BOPE. 16:30 - 20:00 3.50 RIGU P COMP R/U & Test BOPE to 250 I 3500 psi., Annular to 250 I 2500 psi. Witness waived by John Crisp, AOGCC. 20:00 - 20:30 0.50 PERF P COMP PJSM. Rig Up to P/U & Run 27/8" Tubing work String. 20:30 - 23:00 2.50 PERF P COMP P/U 39 Jts 2 7/8" Tubing. POH & rack back in Derrick. 23:00 - 00:00 1.00 PERF P COMP Pump through Kill Line, Close Blind Rams & test 7" Casing to 3500 psi for 30 Minutes. PJSM wI HES on P/U Perf. Guns. 3/22/2003 00:00 - 00:30 0.50 PERF P COMP P/U, M/U & RIH wI 70 Ft. of HES 4 5/8",5 spf, Mellennium Guns Printed: 3/31/2003 11 :00:04 AM ) ') BP EXPLORATION Operations Summary Report Legal Well Name: MPS-18 Common Well Name: MPS-18 Event Name: DRILL +COMPLETE Contractor Name: DOYON DRILLING INC. Rig Name: DOYON 14 From- To Hours Task Code NPT 3/22/2003 00:30 - 04:00 3.50 PERF P 04:00 - 08:30 4.50 PERF P Phase COMP COMP 08:30 - 09:30 1.00 PERF P COMP 09:30 - 11 :00 1.50 PERF P COMP 11 :00 - 14:30 3.50 PERF P COMP 14:30 - 15:30 1.00 PERF P COMP 15:30 - 20:00 4.50 RUNCOrvP COMP 20:00 - 00:00 4.00 RUNCOrvP COMP 3/23/2003 00:00 - 04:00 4.00 RUNCOrvP COMP 04:00 - 05:30 1.50 RUNCOrvP COMP 05:30 - 06:30 1.00 RUNCOrvP COMP 06:30 - 07:00 0.50 RUNCOrvP COMP 07:00 - 19:30 12.50 RUNCOrvP COMP 19:30 - 23:30 4.00 RUNCOrvP COMP 3/24/2003 23:30 - 00:00 00:00 - 01 :00 COMP COMP 0.50 RUNCOrvP 1.00 RUNCOrvP 01 :00 - 02:00 1.00 RUNCOrvP COMP 02:00 - 04:00 2.00 RUNCOrvP COMP 04:00 - 05:30 1.50 RUNCOrvP COMP 05:30 - 07:00 1.50 RUNCOrvP COMP 07:00 - 09:30 2.50 RUNCOrvP COMP 09:30 - 13:00 3.50 RUNCOr COMP Page 6 of7 Start: 2/16/2003 Rig Release: 3/24/2003 Rig Number: 14 Spud Date: 2/17/2003 End: 3/24/2003 Description öf Operations RIH wI Perf. Guns on 2 7/8" Work String to place RA Pup @ 8326' PJSM, R/U SWS Grease Injection I Pump Down lubricator with Pump-In Sub. RIH wI GR I CCl for Perf Correlation, Pump down from 2800' to 8400'. Correlate to top shot @ 8434'. POH & LID GR/CCL. RID SWS. Pull up 34 Ft. to put HES 4 5/8", 5 spf, 72 deg Phase, 0.36 Diam. Perf Guns at Depth to Perforate from 8434' to 8474' and from 8512' to 8542'. . R/U Pump-In Sub & TIW. Pressure up to 3500 psi. Wait 6 Minutes - Guns Fired. Pulled 2 stands, observed well for 10 Minutes. Fluid level approximately 1 Bbl. down. Well static. Displace Well wI 9.1 ppg. Brine @ 5 BPM - 1100 psi. Observe Well - 0.5 bbl. loss in 10 minutes. POH & Stand Back 2 7/8" Tubing. LID Perf Guns. All Shots Fired. Clear Floor, P/U Scraper Assy. & RIH to 8560'. POH, LID 2 7/8" Tubing Work String. Perforations taking approximately 2 Bbls per hour. POH wI 2 7/8" Tubing Work String. LID 7" Scraper Assy. Run Test Plug, C/O Top Rams to 2 3/8" Dual's while R/U to Run 2 3/8" Dual Completion. Close Blind Rams, Run Dual test Jt. & Test Dual 2 3/8" Rams to 250 I 3500 psi. LID Dual test Jt. Pull Test plug. PJSM on Dual Running Procedure wI Co. Rep, TP, Rig Crew, GBR & Baker. Run 2 3/8" Dual Completion as per program. Position Packers for GR I CCl Correlation. R/U SWS E-Line wI TIW, Pump in Sub & Grease Injector lubricator. RIH wI GR/CCl to 2680'. Tool Stopped. Pump Tools down to 8480' wI 1 BPM @ 200 psi. Correlate to SCMT log. Packers on depth - No adjustment needed. POH, LID Tools & RID SWS. Space out Dual Completion String. Space out Dual 2 3/8" Tubing Strings wI appropriate Pup Jts one Full Jt. below Hanger. M/U Split Dual Hanger with TWC's Installed & land same. Top of' GT' Packer @ 8407'. Top of' FH I Packer @ 8482'. R.I.L.D.S. , Back out & LID landing Jts. Close Blind Rams & Test TWC's to 1000 psi. C/O Rams: Top to 2 7/8" X 5", Bottom to 3 1/2" X 6". N/D BOPE. N/U 7 1/16", 5000 psi. Dual Tree wI 21/16" Bores. Test Tree & Hanger ( Both Sides) to 5000 psi. Pull TWC's. R/U Circulating I Testing Manifold & Test to 3500 psi. Reverse Circulate 200 Bbls, 9.1 ppg., Corrosion Inhibited Brine down Annulus and up both Strings of Tubing. Switch to HB&R and follow with 65 Bbls. of Diesel for Freeze protection in Annulus to 2380 MD I 2040' TVD. Pumped @ 2 1/4 BPM - 1200 psi. Drop 1 3/4" Ball down long String. Bullhead down wI 27 Bbls. Printed: 3/31/2003 11 :00:04 AM ) ) Legal Well Name: Common Well Name: Event Name: Contractor Name: Rig Name: Date BP EXPLORATION Operations Summary Report Page.7of7 MPS-18 M PS-18 DRILL +COMPLETE DOYON DRILLING INC. DOYON 14 Start: 2/16/2003 Rig Release: 3/24/2003 Rig Number: 14 Spud Date: 2/17/2003 End: 3/24/2003 3/24/2003 09:30 - 13:00 From -To Hours Task Code NPT Phase COMP 13:00 - 15:00 15:00 -18:00 Description of Operations 3.50 RUNCOIVP 9.7 ppg. Brine @ 1 BPM & 950 psi. Ball seated w 1500 psi. Let Annulus Bleed off to 500 psi. Switch to HB&R & pressure up on Long string wI diesel to 3000 psi. Chart test for 30 Minutes. Pressure up to 3500 psi to shear Hydro sub. Pump additional 5 bbls diesel to freeze protect to 1300'. Switch to Annulus & pressure test wI diesel to 2000 psi Chart test for 30 minutes. No Communication. With Rig, pump Down Short string wI 9.7 ppg Brine while monitoring Long string. Formation broke down @ 1200 psi after pumping 3 Bbls. Pump additional 5 Bbls @ 1 BPM wI 1100 psi. 2.00 RIGD P No communication between strings. Drop ball down Short String. Bullhead down wI 32 Bbls. 9.7 ppg. Brine @ 1 BPM & 950 psi. Set Ball in 'XN' Nipple. Pressure up wI diesel to 3000 psi while monitoring annulus. No Communication. Hold & Chart test for 30 Minutes. After test, shear ball wI 3700 psi. Pump additional 5 Bbls diesel to freeze protect to 1300'. Shut in Tree. RID HB&R. R/U MPU Well Support Lubricator & Install BPV's on both Long & Short Strings. RID Lubricator. Suck out Lines wI Vac. truck, RID Test Manifold, Install Valve Handles on Tree, Wash out Pits. Clear Floor. LID 20 Stands of 4" DP out of Derrick. RIG RELEASED @ 18:00 HRS. - 3/24/2003 COMP 3.00 RIGD P COMP Printed: 3/31/2003 11 :00:04 AM Legal Name: Common Name: Test Date 2/19/2003 MPS-18 MPS-18 Test Type FIT Test Depth (TMD) 2,940.0 (ft) BPEXPLQRATION Leak-OffTèstSUl11l11ðry Test Depth (TVD) 2,258.0 (ft) AMW 8.80 (ppg) SurtåcePressure Lf~åkOffPres$We(BHP) 330 (psi) 1,362 (psi) EMW 11.61 (ppg) "~' "__0 Printed: 3/31/2003 10:59:54 AM " ,) ) 17 -Jun-03 AOGCC 333 W. 7th Ave. Suite 100 Anchorage, AK 99501 Redistribution due to coordinate change Re: Distribution of Survey Data for Well MPS-18PB1 Gyro Dear Dear Sir/Madam: Enclosed are two survey hard copies and 1 disk Tie-on Survey: Window / Kickoff Survey: Projected Survey: 0.00' MD 0.00 I MD (if applicable) 0.00' MD Please call me at 273-3545 if you have any questions or concerns. Regards, d-o~-d. 4d--, RECEIVED JUL 0 1 Z003 William T. Allen Survey Manager Ala.! Chi & Gas Cons. Gommi~n '" D Anchorage ~.~ Attachment(s) ) ) 26-Mar-03 AOGCC 333 W. 7th Ave. Suite 100 Anchorage, AK 99501 Re: Distribution of Survey Data for Well MPS-18PB1 Gyro Dear Dear Sir/Madam: Enclosed are two survey hard copies and 1 disk Tie-on Survey: Window / Kickoff Survey: Projected Survey: 0.00' MD 0.00' MD (if applicable) 0.00' MD Please call me at 273-3545 if you have any questions or concerns. Regards, William T. Allen Survey Manager Attachment(s) RECEIVED APR 1 7 2003 Aiamta Qj & Gas Cons r-,., '. An~ \J\I~n c9oa~d~ cJ ~ I N ~ Sperry-Sun Drilling Services ....,.--- Milne Point Unit BPXA Milne Point MPS MPS-18PB1 Gyro Job No. AKF02289288,Surveyed: 24 February, 2003 Survey Report 12 June, 2003 -~ Your Ref: APlS00292313370 Surface Coordinates: 5999979.02 N, 565830.54 E (70024' 37.3835" N, 149027' 50.2505" W) Grid Coordinate System: NAD27 Alaska State Planes, Zone 4 Surface Coordinates relative to Project H Reference: 999979.02 N, 65830.54 E (Grid) Surface Coordinates relative to Structure: 8.55 N, 514.40 W (True) Kelly Bushing: 72.56ft above Mean Sea Level Elevation relative to Project V Reference: 72.56ft Elevation relative to Structure: 72.56ft spl!!r"....y-!!iLJl1 DAILLING SSAVlces A Halliburton Company DEFNITIVE Survey Ref: 5vy1140 Sperry-Sun Drilling Services Survey Report for Milne Point MPS . MPS·18PB1 Gyro Your Ref: API 500292313370 Job No. AKF02289288, Surveyed: 24 February, 2003 BP EXPLORA TION (ALASKA) INC. BPXA Milne Point Unit Measured Sub-Sea Vertical Local Coordinates Global Coordinates Dogleg Vertical Depth Incl. Azim. Depth Depth Northings Eastings Northings Eastings Rate Section Comment (ft) (ft) (ft) (ft) (ft) (ft) (ft) (0/100ft) 0.00 0.000 0.000 -72.56 0.00 O.OON 0.00 E 5999979.02 N 565830.54 E 0.00 Tolerable Gyro 122.00 0.350 302.000 49.44 122.00 0.20N 0.32W 5999979.21 N 565830.22 E 0.287 0.04 244.00 1.100 358.000 171.43 243.99 1.57 N 0.67W 5999980.58 N 565829.85 E 0.778 1.11 329.00 2.850 358.000 256.38 328.94 4.49 N 0.78W 5999983.51 N 565829.73 E 2.059 3.69 424.00 4.600 0.000 351.17 423.73 10.66 N 0.86W 5999989.68 N 565829.59 E 1.847 9.18 .):0-. 511.00 7.000 2.000 437.72 510.28 19.45 N 0.67W 5999998.46 N 565829.70 E 2.768 17.14 603.00 9.250 357.000 528.79 601.35 32.44 N 0.86W 6000011.45 N 565829.39 E 2.561 28.70 All data is in Feet (US Survey) unless otherwise stated. Directions and coordinates are relative to True North. Vertical depths are relative to Well. Northings and Eastings are relative to Well. Global Northings and Eastings are relative to NAD27 Alaska State Planes, Zone 4. The Dogleg Severity is in Degrees per 100 feet (US Survey). Vertical Section is from Well and calculated along an Azimuth of 26.280° (True). Magnetic Declination at Surface is 25.592°(16-Feb-03) Based upon Minimum Curvature type calculations, at a Measured Depth of 603.00ft., The Bottom Hole Displacement is 32.45ft., in the Direction of 358.475° (True). Survey tool program for MPS-18PB1 Gvro ./- From Measured Vertical Depth Depth (ft) (ft) To Measured Vertical Depth Depth Survey Tool Description (ft) (ft) 0.00 0.00 603.00 601.35 Tolerable Gyro 12 June, 2003 - 15:22 Page 20f2 Dri//Quest 3.03.02.005 ') ) 17 -Jun-03 AOGCC 333 W. 7th Ave. Suite 100 Anchorage, AK 99501 Redistribution due to coordinate change Re: Distribution of Survey Data for Well· MPS-18 Dear Dear Sir/Madam: Enclosed are two survey hard copies and 1 disk Tie-on Survey: 4,772.45' MD Window / Kickoff Survey: 4,800.00' MD (if applicable) Projected Survey: 8,704.00 I MD Please call me at 273-3545 if you have any questions or concerns. Regards, William T. Allen Survey Manager d-O~-~4~ RECE\VED Attachment(s) JUL 0 1 2003 Älast\a oa &. Gas Com~. eommiseton ~cnge ~ ~1~ ,) ) óJOd-d'l~ 26-Mar-03 AOGCC 333 W. 7th Ave. Suite 100 Anchorage, AK 99501 Re: Distribution of Survey Data for Well MPS-18 Dear Dear Sir/Madam: Enclosed are two survey hard copies and 1 disk Tie-on Survey: 4,772.45' MD Window / Kickoff Survey: 4,800.00 I MD (if applicable) Projected Survey: 8,704.00' MD Please call me at 273-3545 if you have any questions or concerns. Regards, William T. Allen Survey Manager Attachment(s) RECEIVED APR 1 7 2003 AJaka œ & Gas Cons. Commission Anchor&1e ~. c< 'j-" r6 J c6 o (Ù Sperry-Sun Drilling Services ,....,~ Milne Point Unit BPXA Milne Point MPS MPS-18 Job No. AKZZ2289288, Surveyed: 24 February, 2003 Survey Report 12 June, 2003 ~-. Your Ref: API 500292313300 Surface Coordinates: 5999979.02 N, 565830.54 E (700 24' 37.3835" N, 1490 27' 50.2505" W) Grid Coordinate System: NAD27 Alaska State Planes, Zone 4 Surface Coordinates relative to Project H Reference: 999979.02 N, 65830.54 E (Grid) Surface Coordinates relative to Structure: 8.55 N, 514.40 W (True) Kelly Bushing: 72.56ft above Mean Sea Level Elevation relative to Project V Reference: 72.56ft Elevation relative to Structure: 72.56ft Sn-'-'''''Y-55UI''1 DRILLING seRVices A Halliburton Company JEF N-TVE Survey Ref: svy1144 Sperry-Sun Drilling Services Survey Report for Milne Point MPS - MPS-18 Your Ref: API 500292313300 Job No. AKZZ2289288, Surveyed: 24 February, 2003 BP EXPLORA TION (ALASKA) INC. BPXA Milne Point Unit Measured Sub-Sea Vertical Local Coordinates Global Coordinates Dogleg Vertical Depth Incl. Azim. Depth Depth Northings Eastings Northlngs Eastings Rate Section Comment (ft) (ft) (ft) (ft) (ft) (ft) (ft) (O/100ft) 4772.45 69.600 347.510 2799.02 2871.58 3141.00 N 685.68 W 6003113.85 N 565117.20 E 2512.76 Tie On Point 4800.00 69.840 347.500 2808.57 2881.13 3166.23 N 691.27 W 6003139.03 N 565111.39 E 0.872 2532.90 Window Point 4868.99 67.030 350.370 2833.93 2906.49 3229.18N 703.60 W 6003201.87 N 565098.51 E 5.617 2583.89 4962.85 66.240 351.280 2871.15 2943.71 3314.24 N 717.34 W 6003286.81 N 565084.02 E 1.225 2654.07 .--- 5057.74 66.930 351 .250 2908.86 2981.42 3400.30 N 730.56 W 6003372.75 N 565070.04 E 0.728 2725.39 5153.07 67.120 350.580 2946.07 3018.63 3486.97 N 744.42 W 6003459.29 N 565055.41 E 0.677 2796.96 5247.76 66.850 350.170 2983.09 3055.65 3572.90 N 758.99 W 6003545.09 N 565040.09 E 0.490 2867.55 5343.49 66.380 350.660 3021 .09 3093.65 3659.53 N 773.62 W 6003631.59 N 565024.69 E 0.680 2938.76 5438.48 65.630 349.830 3059.72 3132.28 3745.06 N 788.33 W 6003716.99 N 565009.24 E 1.123 3008.94 5534.52 65.350 350.500 3099.56 3172.12 3831.16 N 803.25 W 6003802.95 N 564993.55 E 0.699 3079.53 5629.64 65.440 350.040 3139.16 3211.72 3916.40 N 817.87 W 6003888.06 N 564978.18 E 0.450 3149.49 5724.73 64.900 349.250 3179.10 3251.66 4001.29 N 833.38 W 6003972.81 N 564961.93 E 0.944 3218.74 5821.21 64.870 349.000 3220.05 3292.61 4087.08 N 849.86 W 6004058.45 N 564944.69 E 0.237 3288.36 5917.30 67.460 349.640 3258.87 3331 .43 4173.45 N 866.14 W 6004144.67 N 564927.65 E 2.763 3358.59 6014.70 70.370 350.180 3293.91 3366.47 4262.91 N 882.06 W 6004233.99 N 564910.94 E 3.032 3431.76 6108.68 73.490 350.070 3323.06 3395.62 4350.92 N 897.38 W 6004321.86 N 564894.85 E 3.322 3503.89 6206.02 73.160 349.840 3350.99 3423.55 4442.74 N 913.64 W 6004413.53 N 564877.77 E 0.408 3579.02 6301.16 71.910 346.910 3379.55 3452.11 4531.62 N 931.92 W . 6004502.25 N 564858.71 E 3.218 3650.62 6396.59 71.270 347.230 3409.68 3482.24 4619.87 N 952.18 W 6004590.32 N 564837.67 E 0.742 3720.78 6491.87 70.570 346.440 3440.83 3513.39 4707.55 N 972.69 W 6004677.81 N 564816.40 E 1.074 3790.31 6589.79 69.960 346.480 3473.89 3546.45 4797.15 N 994.27 W 6004767.22 N 564794.03 E 0.624 3861.10 -- 6685.41 69.700 345.860 3506.87 3579.43 4884.31 N 1015.72 W 6004854.18 N 564771.81 E 0.667 3929.75 6779.16 70.430 346.730 3538.83 3611.39 4969.93 N 1036.60 W 6004939.62 N 564750.17 E 1.169 3997.28 6873.69 69.950 346.770 3570.87 3643.43 5056.50 N 1056.99 W 6005026.00 N 564729.03 E 0.509 4065.87 6971.73 70.370 346.550 3604.14 3676.70 5146.23 N 1078.26 W 6005115.54 N 564706.96 E 0.478 4136.91 7065.22 70.360 346.310 3635.56 3708.12 5231.82 N 1098.92 W 6005200.95 N 564685.54 E 0.242 4204.51 7160.98 70.110 347.490 3667.94 3740.50 5319.60 N 1119.35 W 6005288.54 N 564664.35 E 1.189 4274.17 7256.97 70.280 347.220 3700.46 3773.02 5407.72 N 1139.12 W 6005376.49 N 564643.80 E 0.318 4344.43 7352.75 70.280 348.570 3732.78 3805.34 5495.87 N 1158.03 W 6005464.47 N 564624.12 E 1.327 4415.10 7449.11 70.620 347.970 3765.03 3837.59 5584.78 N 1176.49 W 6005553.21 N 564604.87 E 0.685 4486.64 7545.72 71.200 348.510 3796.62 3869.18 5674.16 N 1195.09 W 6005642.43 N 564585.48 E 0.800 4558.55 7640.20 71.620 348.850 3826.74 3899.30 5761.97 N 1212.67 W 6005730.08 N 564567.13 E 0.560 4629.50 7738.31 71.920 348.930 3857.44 3930.00 5853.41 N 1230.63 W 6005821.35 N 564548.37 E 0.315 4703.53 7832.87 71.270 349.010 3887.29 3959.85 5941.47 N 1247.79 W 6005909.26 N 564530.43 E 0.692 4774.90 7927.93 68.300 346.630 3920.14 3992.70 6028.66 N 1266.59 W 6005996.28 N 564510.86 E 3.909 4844.74 -.--------- 12 June, 2003 - 15:23 Page 2 of4 DrillQuest 3.03.02.005 Dri/lQuest 3.03.02.005 Page 3 of4 12 June, 2003 - 15:23 ----.------ Tie On Point Window Point Projected Survey 685.68 W 691.27 W 1473.61 W 3141.00 N 3166.23 N 6602.77 N 2871.58 2881.13 4453.74 4772.45 4800.00 8704.00 Comment Station Coordinates TVD Northings Eastings (ft) (ft) (ft) Measured Depth (ft) Comments .-... Based upon Minimum Curvature type calculations, at a Measured Depth of 8704.00ft., The Bottom Hole Displacement is 6765.21ft., in the Direction of 347.419° (True). Magnetic Declination at Surface is 25.592°(16-Feb-03) The Dogleg Severity is in Degrees per 100 feet (US Survey). Vertical Section is from Well and calculated along an Azimuth of 26.280° (True). All data is in Feet (US Survey) unless otherwise stated. Directions and coordinates are relative to True North. Vertical depths are relative to Well. Northings and Eastings are relative to Well. Global Northings and Eastings are relative to NAD27 Alaska State Planes, Zone 4. Sperry-Sun Drilling Services Survey Report for Milne Point MPS - MPS-18 Your Ref: API 500292313300 Job No. AKZZ2289288, Surveyed: 24 February, 2003 BP EXPLORA TION (ALASKA) INC. BPXA Milne Point Unit Measured Sub-Sea Vertical Local Coordinates Global Coordinates Dogleg Vertical Depth Incl. Azim. Depth Depth Northings Eastings Northings Eastings Rate Section Comment (ft) (ft) (ft) (ft) (ft) (ft) (ft) r/100ft) 8025.96 64.690 345.100 3959.23 4031.79 6115.82 N 1288.53 W 6006083.24 N 564488.16 E 3.951 4913.19 8122.07 62.130 344.800 4002.25 4074.81 6198.81 N 1310.84 W 6006166.03 N 564465.12 E 2.678 4977.72 8218.09 57.330 341.970 4050.64 4123.20 6278.25 N 1334.49 W 6006245.26 N 564440.76 E 5.609 5038.48 8315.95 51.990 339.820 4107.23 4179.79 6353.66 N 1360.56 W 6006320.44 N 564414.03 E 5.743 5094.56 -, 8409.55 48.430 338.160 4167.13 4239.69 6420.80 N 1386.32 W 6006387.35 N 564387.68 E 4.040 5143.35 8505.43 43.330 335.050 4233.86 4306.42 6483.97 N 1413.56 W 6006450.28 N 564359.89 E 5.805 5187.93 8601.70 41 .770 332.440 4304.78 4377.34 6542.35 N 1442.33 W 6006508.40 N 564330.60 E 2.447 5227.53 8635.18 41 .670 332.670 4329.77 4402.33 6562.12 N 1452.60 W 6006528.08 N 564320.16 E 0.546 5240.72 8704.00 41.670 332.670 4381.18 4453.74 6602.77 N 1473.61 W 6006568.54 N 564298.79 E 0.000 5267.86 Projected Survey BP EXPLORA TION (ALASKA) INC. Milne Point Unit Sperry-Sun Drilling Services Survey Report for Milne Point MPS - MPS-18 Your Ref: API 500292313300 Job No. AKZZ2289288, Surveyed: 24 February, 2003 BPXA Survey tool program for MPS-18 ---..' From Measured Vertical Depth Depth (ft) (ft) 0.00 603.00 0.00 601.35 /- 12 June, 2003 - 15:23 To Measured Vertical Depth Depth Survey Tool Description (ft) (ft) 603.00 8704.00 601.35 Tolerable Gyro (MPS-18PB 1 Gyro) 4453.74 AK-6 BP _IFR-AK (MPS-18PB1) Page 4 of4 DrillQuest 3.03.02.005 ) ") 17-Jun-03 AOGCC 333 W. 7th Ave. Suite 100 Anchorage, AK 99501 Redistribution due to coordinate change Re: Distribution of Survey Data for Well MPS-18 MWD Dear Dear Sir/Madam: Enclosed are two survey hard copies and 1 disk Tie-on Survey: 4,772.45' MD Window / Kickoff Survey: 4,800.00' MD (if applicable) Projected Survey: 8,704.00' MD Please call me at 273-3545 if you have any questions or concerns. Regards, ~D d,-~Lf-~ &:~ ü= t' ~. i'V, ~= ~'1'¡ ~ "\ u.."... V r""" , " , Ií::œ" /J /' ~ '~":i¡;~~ William T. Allen Survey Manager JU' 0·, r~f'-:' I... ¡ C.,I ~,\." Attachment(s) A12êbJ ~£~\:; 2; l.~. ::} ,. . ., <... :':;',<,~,~:._;, ¡. ~ i.. ."''¡'.,'-'''-'''ii'\r,,' /1?iUi:~ -"'~.~!...¡,.. ¡'.'. ..., ....'4..... .' Cr- ) AOGCC 333 W. 7th Ave. Suite 100 Anchorage, AK 99501 Re: Distribution of Survey Data for Well MPS-18 MWD Dear Dear Sir/Madam: Enclosed are two survey hard copies and 1 disk Tie-on Survey: 4,772.45' MD Window / Kickoff Survey: 4,800.00' MD (if applicable) Projected Survey: 8,704.00 I MD Please call me at 273-3545 if you have any questions or concerns. Regards, William T. Allen Survey Manager Attachment(s) ') aO¡;;)-d lid 26-Mar-03 RECEIVED APR 1 7 2003 A!asfœ Oii & ~= Commisaion .; r( ~ 16 ì ri ~ Sperry-Sun Drilling Services ~ Milne Point Unit BPXA Milne Point MPS MPS-18 MWD Job No. AKMW2289288, Surveyed: 24 February, 2003 Survey Report 12 June, 2003 ,~~. Your Ref: API 500292313300 Surface Coordinates: 5999979.02 N, 565830.54 E (700 24' 37.3835" N, 1490 27' 50.2505" W) Grid Coordinate System: HAD27 Alaska State Planes, Zone 4 Surface Coordinates relative to Project H Reference: 999979.02 H, 65830.54 E (Grid) Surface Coordinates relative to Structure: 8.55 H, 514.40 W (True) Kelly Bushing: 72.56ft above Mean Sea Level Elevation relative to Project V Reference: 72.56ft Elevation relative to Structure: 72.56ft 5n-.-......' I-BUn I :=r . DRILLING SERVices A Halliburton Company Survey Ref: svy1143 Sperry-Sun Drilling Services Survey Report for Milne Point MPS - MPS-18 MWD Your Ref: AP/S00292313300 Job No. AKMW2289288, Surveyed: 24 February, 2003 BP EXPLORA TION (ALASKA) INC. BPXA Milne Point Unit Measured Sub-Sea Vertical Local Coordinates Global Coordinates Dogleg Vertical Depth Incl. Azim. Depth Depth Northings Eastings Northings Eastings Rate Section Comment (ft) (ft) (ft) (ft) (ft) (ft) (ft) r/100ft) 4772.45 69.600 349.700 2799.03 2871.59 3146.93 N 657.36 W 6003120.03 N 565145.46 E 2530.61 Tie On Point 4800.00 69.840 347.500 2808.58 2881.14 3172.26 N 662.47 W 6003145.32 N 565140.13 E 7.541 2551.06 Window Point 4868.99 67.030 351.570 2833.95 2906.51 3235.33 N 674.14 W 6003208.28 N 565127.91 E 6.832 2602.44 4962.85 66.240 352.020 2871.17 2943.73 3320.61 N 686.44 W 6003293.45 N 565114.86 E 0.950 2673.47 5057.74 66.930 351.900 2908.88 2981 .44 3406.83 N 698.62 W 6003379.56 N 565101.92 E 0.736 2745.38 ~- 5153.07 67.120 351.030 2946.09 3018.65 3493.62 N 711.65 W 6003466.23 N 565088.13 E 0.864 2817.44 5247.76 66.850 350.170 2983.11 3055.67 3579.60 N 725.88 W 6003552.09 N 565073.14 E 0.883 2888.23 5343.49 66.380 351.420 3021.11 3093.67 3666.34 N 739.94 W 6003638.69 N 565058.32 E 1.295 2959.77 5438.48 65.630 351.430 3059.74 3132.30 3752.15 N 752.88 W 6003724.38 N 565044.62 E 0.790 3030.99 5534.52 65.350 350.420 3099.58 3172.14 3838.44 N 766.66 W 6003810.55 N 565030.08 E 1.000 3102.26 5629.64 65.440 350.430 3139.18 3211.74 3923.71 N 781.04 W 6003895.70 N 565014.94 E 0.095 3172.35 5724.73 64.900 349.410 3179.11 3251.67 4008.68 N 796.15 W 6003980.53 N 564999.09 E 1.127 3241.85 5821.21 64.870 349.510 3220.06 3292.62 4094.56 N 812.13 W 6004066.27 N 564982.36 E 0.099 3311.78 5917.30 67.460 350.150 3258.89 3331.45 4181.07 N 827.64 W 6004152.63 N 564966.08 E 2.763 3382.48 6014.70 70.370 350.560 3293.93 3366.49 4270.66 N 842.86 W 6004242.08 N 564950.07 E 3.013 3456.06 6108.68 73.490 350.210 3323.08 3395.64 4358.73 N 857.78 W 6004330.02 N 564934.37 E 3.339 3528.43 6206.02 73.160 350.000 3351.01 3423.57 4450.59 N 873.81 W 6004421.74 N 564917.54 E 0.397 3603.70 6301.16 71.910 346.780 3379.57 3452.13 4539.48 N 892.06 W 6004510.46 N 564898.50 E 3.485 3675.32 6396.59 71.270 347.700 3409.70 3482.26 4627.79 N 912.06 W 6004598.59 N 564877.73 E 1.134 3745.64 6491.87 70.570 346.770 3440.85 3513.41 4715.60 N 931.95 W 6004686.23 N 564857.06 E 1.179 3815.57 6589.79 69.960 346.790 3473.92 3546.48 4805.33 N 953.03 W 6004775.76 N 564835.19 E 0.623 3886.69 ,.-..... 6685.41 69.700 346.140 3506.89 3579.45 4892.59 N 974.04 W 6004862.84 N 564813.42 E 0.694 3955.64 6779.16 70.430 347.060 3538.85 3611.41 4978.32 N 994.46 W 6004948.39 N 564792.24 E 1 .207 4023.46 6873.69 69.950 347.150 3570.89 3643.45 5065.02 N 1014.31 W 6005034.90 N 564771.63 E 0.516 4092.41 6971.73 70.370 346.540 3604.16 3676.72 5154.82 N 1035.30 W 6005124.51 N 564749.85 E 0.725 4163.63 7065.22 70.360 346.290 3635.58 3708.14 5240.41 N 1055.98 W 6005209.92 N 564 728.41 E 0.252 4231.22 7160.98 70.110 347.670 3667.96 3740.52 5328.21 N 1076.28 W 6005297.53 N 564707.34 E 1.381 4300.96 7256.97 70.280 347.230 3700.48 3773.04 5416.36 N 1095.91 W 6005385.51 N 564686.94 E 0.466 4371.31 7352.75 70.280 348.520 3732.80 3805.36 5504.51 N 1114.84 W 6005473.49 N 564667.22 E 1.268 4441.96 7449.11 70.620 349.680 3765.05 3837.61 5593.67 N 1132.01 W 6005562.50 N 564649.27 E 1.188 4514.31 7545.72 71.200 350.480 3796.65 3869.21 5683.60 N 1147.74 W 6005652.29 N 564632.75 E 0.986 4587.98 7640.20 71.620 348. 960 3826.77 3899.33 5771.71 N 1163.72W 6005740.25 N 564615.99 E 1.588 4659.91 7738.31 71.920 349.360 3857.46 3930.02 5863.24 N 1181.25 W 6005831.62 N 564597.66 E 0.493 4734.21 7832.87 71.270 349.540 3887.32 3959.88 5951.44 N 1197.67 W 6005919.67 N 564580.46 E 0.711 4806.03 7927.93 68.300 346.370 3920.17 3992.73 6038.66 N 1216.26 W 6006006.73 N 564561.10 E 4.422 4876.00 _________0___ 12 June, 2003 - 15:24 Page 2 0'4 DrillQllest 3.03.02.005 DrWQlIest 3.03.02.005 Page 30'4 12 June, 2003 - 15:24 Tie On Point Window Point Projected Survey 657.36 W 662.47 W 1423.38 W 3146.93 N 3172.26 N 6612.90 N 2871.59 2881.14 4453.77 4772.45 4800.00 8704.00 Comment Station Coordinates TVD Northings Eastings (ft) (ft) (ft) Measured Depth (ft) Comments /'~"'- Based upon Minimum Curvature type calculations, at a Measured Depth of 8704.00ft., The Bottom Hole Displacement is 6764.35ft., in the Direction of 347.853° (True). Magnetic Declination at Surface is 25.592°(16-Feb-03) The Dogleg Severity is in Degrees per 100 feet (US Survey). Vertical Section is from Well and calculated along an Azimuth of 26.280° (True). All data is in Feet (US Survey) unless otherwise stated. Directions and coordinates are relative to True North. Vertical depths are relative to Well. Northings and Eastings are relative to Well. Global Northings and Eastings are relative to NAD27 Alaska State Planes, Zone 4. Sperry-Sun Drilling Services Survey Report for Milne Point MPS w MPSw18 MWD Your Ref: API 500292313300 Job No. AKMW2289288, Surveyed: 24 February, 2003 BP EXPLORA TION (ALASKA) INC. BPXA Milne Point Unit Measured Sub-Sea Vertical Local Coordinates Global Coordinates Dogleg Vertical Depth Incl. Azim. Depth Depth Northings Eastings Northings Eastings Rate Section Comment (ft) (ft) (ft) (ft) (ft) (ft) (ft) (0/100ft) 8025.96 64.690 344.640 3959.26 4031.82 6125.68 N 1238.74 W 6006093.55 N 564537.86 E 4.022 4944.08 8122.07 62.130 344.680 4002.28 4074.84 6208.56 N 1261.47 W 6006176.22 N 564514.39 E 2.664 5008.32 8218.09 57.330 341.850 4050.67 4123.23 6287.96 N 1285.29 W 6006255.40 N 564489.87 E 5.609 5068.97 8315.95 51.990 340.310 4107.26 4179.82 6363.45 N 1311.13W 6006330.67 N 564463.37 E 5.605 5125.22 r~ 8409.55 48.430 338.490 4167.15 4239.71 6430.77 N 1336.40 W 6006397.76 N 564437.51 E 4.086 5174.39 8505.43 43.330 334.720 4233.89 4306.45 6493.94 N 1363.63 W 6006460.68 N 564409.73 E 6.020 5218.97 8601.70 41.770 332.730 4304.81 4377.37 6552.31 N 1392.43 W 6006518.80 N 564380.41 E 2.140 5258.56 8635.18 41.670 332.980 4329.80 4402.36 6572.14 N 1402.59 W 6006538.54 N 564370.07 E 0.580 5271.84 8704.00 41.670 332.980 4381.21 4453.77 6612.90 N 1423.38 W 6006579.11 N 564348.93 E 0.000 5299.18 Projected Survey BP EXPLORA TION (ALASKA) INC. Milne Point Unit Sperry-Sun Drilling Services Survey Report for Milne Point MPS - MPS-18 MWD Your Ref: API 500292313300 Job No. AKMW2289288, Surveyed: 24 February, 2003 BPXA Survey tool program for MPS-18 MWD -- From Measured Vertical Depth Depth (ft) (ft) 0.00 603.00 0.00 601.35 ~. 12 June, 2003 - 15:24 To Measured Vertical Depth Depth Survey Tool Description (ft) (ft) 603.00 8704.00 601.35 Tolerable Gyro (MPS-18PB1 Gyro) 4453.77 MWD Magnetic (MPS-18PB1 MWD) -------- Page 4 of4 DrillQuest 3.03.02.005 ) ) 17 -Jun-03 AOGCC 333 W. 7th Ave. Suite 100 Anchorage, AK 99501 Redistribution due to coordinate change Re: Distribution of Survey Data for Well MPS-18PB1 Dear Dear Sir/Madam: Enclosed are two survey hard copies and 1 disk Tie-on Survey: Window / Kickoff Survey: Projected Survey: 0.00' MD 0.00' MD 5,884.00' MD (if applicable) Please call me at 273-3545 if you have any questions or concerns. Regards, ':W~-;Ltf~ RECEIVED William T. Allen Survey Manager JUL 0 1 2003 Alaska em & Gas Coos. Commieeion R~ Attachment(s) ) AOGCC 333 W. 7th Ave. Suite 100 Anchorage, AK 99501 ') ¿;; Oc)~d'ld 26-Mar-03 Re: Distribution of Survey Data for Well MPS-18PB1 Dear Dear Sir/Madam: Enclosed are two survey hard copies and 1 disk Tie-on Survey: Window / Kickoff Survey: Projected Survey: 0.00' MD 0.00' MD 5,884.00' MD (if applicable) Please call me at 273-3545 if you have any questions or concerns. Regards, William T. Allen Survey Manager Attachment(s) RECEIVED APR 1 7 2003 Alaska ün & (;;-.'" Con ' ~S '5. Commistfon Anchorage ~ --.-- - F - ~~ ~ :J r6 \ c6 (J rf> Sperry-Sun Drilling Services Milne Point Unit BPXA Milne Point MPS MPS-18PB1 Job Ho. AKZZ2289288, Surveyed: 24 February, 2003 Survey Report 12 June, 2003 Your Ref: API 500292313370 Surface Coordinates: 5999979.02 H, 565830.54 E (70024' 37.3835" H, 149027'50.2505" W) Grid Coordinate System: HAD27 Alaska State Planes, Zone 4 Surface Coordinates relative to Project H Reference: 999979.02 H, 65830.54 E (Grid) Surface Coordinates relative to Structure: 8.55 H, 514.40 W (True) Kelly Bushing: 72.56ft above Mean Sea Level Elevation relative to Project V Reference: 72.56ft Elevation relative to Structure: 72.56ft spera"'y-sul1 DR'LLINc::i SERVices A Halliburton Company DEFNTIVE Survey Ref: svy1142 Sperry-Sun Drilling Services Survey Report for Milne Point MPS - MPS-18PB1 Your Ref: AP/500292313370 Job No. AKZZ2289288, Surveyed: 24 February, 2003 BP EXPLORA TION (ALASKA) INC. BPXA Milne Point Unit Measured Sub-Sea Vertical Local Coordinates Global Coordinates Dogleg Vertical Depth Incl. Azim. Depth Depth Northings Eastings Northings Eastings Rate Section Comment (ft) (ft) (ft) (ft) (ft) (ft) (ft) (°11 Daft) 603.00 9.250 357.000 528.79 601.35 32.44 N 0.86W 6000011.45 N 565829.39 E 28.70 AK-6 BP JFR-AK 723.85 12.080 354.680 647.54 720.10 54.73 N 2.55W 6000033.73 N 565827.51 E 2.368 47.95 820.70 12.400 349.040 742.19 814.75 75.04 N 5.46 W 6000054.00 N 565824.42 E 1.277 64.86 916.42 14.690 347.570 835.25 907.81 96.98 N 10.03 W 6000075.91 N 565819.66 E 2.419 82.52 1011.50 19.160 348.770 926.19 998.75 124.07 N 15.67 W 6000102.95 N 565813.78 E 4.715 104.31 ._~.-. 1107.30 22.270 349.150 1015.78 1088.34 157.33 N 22.15 W 6000136.15 N 565807.01 E 3.249 131.26 1204.52 24.460 348.600 1105.02 1177.58 195.16 N 29.59 W 6000173.91 N 565799.23 E 2.264 161.88 1301.13 27.400 349.950 1191.90 1264.46 236.66 N 37.43 W 6000215.34 N 565791.03 E 3.104 195.63 1397.42 30.660 348.750 1276.08 1348.64 282.57 N 46.09 W 6000261.17 N 565781.97 E 3.439 232.96 1494.08 37.170 345.160 1356.26 1428.82 335.03 N 58.39 W 6000313.52 N 565769.20 E 7.044 274.55 1591.01 39.300 344.680 1432.39 1504.95 392.95 N 74.00 W 6000371.30 N 565753.08 E 2.219 319.57 1686.07 42.170 345.930 1504.42 1576.98 452.95 N 89.71 W 6000431.16 N 565736.84 E 3.139 366.41 1782.65 42.010 346.480 1576.09 1648.65 515.82 N 105.15 W 6000493.89 N 565720.85 E 0.416 415.94 1878.31 43.560 346.920 1646.29 1718.85 579.05 N 120.09 W 6000556.99 N 565705.35 E 1.650 466.03 1973.46 48.070 347.170 1712.59 1785.15 645.53 N 135.38 W 6000623.33 N 565689.47 E 4.744 518.86 2069.53 48.260 347.41 0 1776.67 1849.23 715.35 N 151.13W 6000693.01 N 565673.11 E 0.272 574.50 2165.20 49.770 347.500 1839.41 1911.97 785.84 N 166.81 W 6000763.36 N 565656.81 E 1.580 630.76 2260.22 52.130 347.770 1899.27 1971.83 857.92 N 182.61 W 6000835.30 N 565640.37 E 2.493 688.39 2356.95 56.800 347.460 1955.48 2028.04 934.78 N 199.50 W 6000912.01 N 565622.81 E 4.835 749.83 2453.80 61.010 348.730 2005.49 2078.05 1015.91 N 216.58 W 6000992.99 N 565605.01 E 4.489 815.02 2548.97 64.400 347.280 2049.12 2121.68 1098.62 N 234.17 W 6001075.54 N 565586.70 E 3.811 881.39 .,~--. 2645.25 66.830 347.280 2088.87 2161.43 1184.16 N 253.48 W 6001160.90 N 565566.64 E 2.524 949.53 2739.90 71.360 348.050 2122.64 2195.20 1270.51 N 272.35 W 6001247.08 N 565547.00 E 4.846 1018.61 2835.56 71.920 348.280 2152.77 2225.33 1359.37 N 290.97 W 6001335.77 N 565527.60 E 0.628 1090.04 2881.03 72.150 348.410 2166.79 2239.35 1401.73 N 299.71 W 6001378.06 N 565518.49 E 0.574 1124.15 3052.18 72.140 347.840 2219.27 2291.83 1561.15 N 333.23 W 6001537.18 N 565483.56 E 0.317 1252.25 3147.98 71.590 348.410 2249.09 2321.65 1650.24 N 351.97 W 6001626.10 N 565464.04 E 0.806 1323.84 3244.34 71.370 347.210 2279.70 2352.26 1739.55 N 371.26 W 6001715.23 N 565443.96 E 1.203 1395.38 3339.79 73.200 346.530 2308.74 2381.30 1828.09 N 391.92 W 6001803.59 N 565422.53 E 2.034 1465.62 3437.26 73.830 346.060 2336.40 2408.96 1918.90 N 414.06 W 6001894.19 N 565399.58 E 0.795 1537.23 3532.50 70.790 345.900 2365.33 2437.89 2006.92 N 436.04 W 6001982.02 N 565376.83 E 3.196 1606.43 3628.85 70.460 346.080 2397.30 2469.86 2095.11 N 458.04 W 6002070.01 N 565354.05 E 0.385 1675.76 3723.48 70.270 345.220 2429.10 2501.66 2181.45 N 480.13 W 6002156.16 N 565331.20 E 0.879 1743.40 3818.22 70.600 345.560 2460.82 2533.38 2267.84 N 502.65 W 6002242.34 N 565307.92 E 0.485 1810.89 3915.43 70.010 348.050 2493.59 2566.15 2356.94 N 523.54 W 6002331.25 N 565286.24 E 2.487 1881.52 12 June, 2003 - 15:23 Page 2 of4 DrillQuest 3.03.02.005 DrillQuest 3.03.02.005 Page 3 of4 12 June, 2003 - 15:23 Sperry-Sun Drilling Services Survey Report for Milne Point MPS - MPS-18PB1 Your Ref: API 500292313370 Job No. AKZZ2289288, Surveyed: 24 February, 2003 BP EXPLORA TION (ALASKA) INC. BPXA Milne Point Unit Measured Sub-Sea Vertical Local Coordinates Global Coordinates Dogleg Vertical Depth Incl. Azim. Depth Depth Northings Eastings Northings Eastings Rate Section Comment (ft) (ft) (ft) (ft) (ft) (ft) (ft) (0/100ft) 4008.55 70.260 348.600 2525.23 2597.79 2442.70 N 541.26 W 6002416.86 N 565267.77 E 0.617 1950.58 4104.03 69.940 349.070 2557.73 2630.29 2530.78 N 558.65 W 6002504.78 N 565249.61 E 0.571 2021.86 4200.38 69.350 348.730 2591.24 2663.80 2619.42 N 576.04 W 6002593.26 N 565231.44 E 0.696 2093.64 4295.85 68.880 348.380 2625.28 2697.84 2706.85 N 593.74 W 6002680.53 N 565212.97 E 0.600 2164.19 ~ 4390.68 68.540 348.310 2659.71 2732.27 2793.38 N 611.59W 6002766.90 N 565194.36 E 0.365 2233.88 4486.51 68.170 348.760 2695.06 2767.62 2880.68 N 629.29 W 6002854.04 N 565175.88 E 0.583 2304.31 4583.24 68.490 347.850 2730.78 2803.34 2968.70 N 647.51 W 6002941.90 N 565156.88 E 0.935 2375.17 4677.61 68.670 347.340 2765.24 2837.80 3054.51 N 666.39 W 6003027.53 N 565137.26 E 0.538 2443.75 4772.45 69.600 347.510 2799.02 2871.58 3141.00 N 685.68 W 6003113.85 N 565117.20 E 0.995 2512.76 4868.69 70.470 347.480 2831.88 2904.44 3229.31 N 705.27 W 6003201.99 N 565096.84 E 0.904 2583.27 4964.64 70.410 347.320 2864.00 2936.56 3317.54 N 724.99 W 6003290.04 N 565076.34 E 0.169 2653.65 5058.02 71.640 346.930 2894.37 2966.93 3403.63 N 744.67 W 6003375.95 N 565055.90 E 1.375 2722.12 5152.73 72.290 346.210 2923.69 2996.25 3491.22 N 765.58 W 6003463.36 N 565034.21 E 0.997 2791.40 5248.42 72.620 346.080 2952.53 3025.09 3579.80 N 787.43 W 6003551.74 N 565011.59 E 0.368 2861.16 5344.16 69.130 348.650 2983.90 3056.46 3668.04 N 807.23 W 6003639.80 N 564991.01 E 4.440 2931.51 5439.48 69.210 347.990 3017.80 3090.36 3755.29 N 825.27 W 6003726.89 N 564972.20 E 0.653 3001.75 5533.89 68.620 348.310 3051.76 3124.32 3841.50 N 843.36 W 6003812.93 N 564953.35 E 0.700 3071.04 5631.74 68.140 347.870 3087.81 3160.37 3930.50 N 862.13 W 6003901.77 N 564933.80 E 0.645 3142.54 5726.10 67.850 347.940 3123.17 3195.73 4016.05 N 880.46 W 6003987.15 N 564914.71 E 0.315 3211.12 5884.00 67.850 347.940 3182.70 3255.26 4159.07 N 911.02 W 6004129.90 N 564882.90 E 0.000 3325.83 Projected Suvey All data is in Feet (US Survey) unless otherwise stated. Directions and coordinates are relative to True North. .- Vertical depths are relative to Well. Northings and Eastings are relative to Well. Global Northings and Eastings are relative to NAD27 Alaska State Planes, Zone 4. The Dogleg Severity is in Degrees per 100 feet (US Survey). Vertical Section is from Well and calculated along an Azimuth of 26.280° (True). Magnetic Declination at Surface is 25.592°(16-Feb-03) Based upon Minimum Curvature type calculations, at a Measured Depth of 5884.00ft., The Bottom Hole Displacement is 4257.68ft.. in the Direction of 347.645° (True). ..- Sperry-Sun Drilling Services Survey Report for Milne Point MPS - MPS-18PB1 Your Ref: API 500292313370 Job No. AKZZ2289288, Surveyed: 24 February, 2003 BP EXPLORA TION (ALASKA) INC. Milne Point Unit BPXA Comments Measured Depth (ft) Station Coordinates TVD Northings Eastings (ft) (ft) (ft) Comment ...,.- 5884.00 3255.26 4159.07 N 911.02 W Projected Suvey Survey tool program for MPS-18PB1 From Measured Vertical Depth Depth (ft) (ft) To Measured Vertical Depth Depth Survey Tool Description (ft) (ft) 0.00 603.00 0.00 601.35 603.00 5884.00 601.35 Tolerable Gyro (MPS-18PB1 Gyro) 3255.26 AK-6 BP _IFR-AK (MPS-18PB1) ~. 12 June, 2003 - 15:23 Page 4 of 4 DrillQuest 3.03.02.005 ') ') 17 -Jun-03 AOGCC 333 W. 7th Ave. Suite 100 Anchorage, AK 99501 Redistribution due to coordinate change Re: Distribution of Survey Data for Well MPS-18PB1 MWD Dear Dear Sir/Madam: Enclosed are two survey hard copies and 1 disk Tie-on Survey: Window I Kickoff Survey: Projected Survey: 0.00' MD 0.00' MD 5,884.00' MD (if applicable) Please call me at 273-3545 if you have any questions or concerns. Regards, William T. Allen Survey Manager d-O ;;l. - d-4 d- RECEIVED Attachment(s) JUL 0 1 2003 Alaska O;~ & Gas Conf;, GümmlS!ion ~Ô ) I' AOGCC 333 W. 7th Ave. Suite 100 Anchorage, AK 99501 ) e9Oddl.b) 26-Mar-03 Re: Distribution of Survey Data for Well MPS-18PB1 MWD Dear Dear Sir/Madam: Enclosed are two survey hard copies and 1 disk Tie-on Survey: Window / Kickoff Survey: Projected Survey: 0.00 I MD 0.00' MD 5,884.00' MD (if applicable) Please call me at 273-3545 if you have any questions or concerns. Regards, William T. Allen Survey Manager Attachment(s) RECEIVED APR 1 7 2003 Ataatœ (A¡ & Gas Cons. Commission Anmorage ç JZ~ /7- ~.-;;. Sperry..Sun Drilling Services '-.~ Milne Point Unit BPXA Milne Point MPS MPS-18PB1 MWD Job No. AKMW2289288, Surveyed: 24 February, 2003 Survey Report 12 June, 2003 .'.,-- Your Ref: 500292313370 Surface Coordinates: 5999979.02 N, 565830.54 E (70024' 37.3835" N, 149027' 50.2505" W) Grid Coordinate System: NAD27 Alaska State Planes, Zone 4 Surface Coordinates relative to Project H Reference: 999979.02 N, 65830.54 E (Grid) Suñace Coordinates relative to Structure: 8.55 N, 514.40 W (True) Kelly Bushing: 72.56ft above Mean Sea Level Elevation relative to Project V Reference: 72.56ft Elevation relative to Structure: 72.56ft 5pE!1'....y-SU.., DRILLING SERVices A Halliburton Company Survey Ref: svy1141 ç Sperry-Sun Drilling Services Survey Report for Milne Point MPS - MPS-18PB1 MWD Your Ref: 500292313370 Job No. AKMW2289288, Surveyed: 24 February, 2003 BP EXPLORA TION (ALASKA) INC. BPXA Milne Point Unit Measured Sub-Sea Vertical Local Coordinates Global Coordinates Dogleg Vertical Depth Incl. Azim. Depth Depth Northings Eastings Northings Eastings Rate Section Comment (ft) (ft) (ft) (ft) (ft) (ft) (ft) (0/100ft) 603.00 9.250 357.000 528.79 601.35 32.44 N 0.86W 6000011.45 N 565829.39 E 28.70 MWD Magnetic 723.85 12.080 354.800 647.54 720.10 54.74 N 2.52W 6000033.73 N 565827.54 E 2.365 47.96 820.70 12.400 349.430 742.19 814.75 75.05 N 5.34W 6000054.02 N 565824.53 E 1.221 64.93 916.42 14.690 347.650 835.25 907.81 97.01 N 9.83W 6000075.94 N 565819.86 E 2.431 82.64 ,~- 1011.50 19.160 349.040 926.18 998.74 124.12 N 15.37 W 6000103.00 N 565814.07 E 4.720 104.49 1107.30 22.270 349.580 1015.78 1088.34 157.42 N 21.65 W 6000136.24 N 565807.51 E 3.252 131.56 1204.52 24.460 348.990 1105.02 1177.58 195.30 N 28.82 W 6000174.06 N 565800.00 E 2.265 162.35 1301.13 27.400 350.290 1191.90 1264.46 236.85 N 36.40 W 6000215.54 N 565792.06 E 3.099 196.26 1397.42 30.660 348.860 1276.08 1348.64 282.79 N 44.88 W 6000261.41 N 565783.17 E 3.461 233.69 1494.08 37.170 345.280 1356.26 1428.82 335.28 N 57.07 W 6000313.78 N 565770.51 E 7.042 275.35 1591.01 39.300 344.700 1432.39 1504.95 393.21 N 72.62 W 6000371.58 N 565754.46 E 2.228 320.42 1686.07 42.170 346.150 1504.42 1576.98 453.25 N 88.20 W 6000431.47 N 565738.35 E 3.179 367.35 1782.65 42.010 346.980 1576.09 1648.65 516.21 N 103.24 W 6000494.30 N 565722.75 E 0.599 417.14 1878.31 43.560 347.120 1646.29 1718.85 579.53 N 117.80 W 6000557.49 N 565707.63 E 1.623 467.48 1973.46 48.070 347.300 1712.59 1785.15 646.06 N 132.90 W 6000623.88 N 565691.95 E 4.742 520.44 2069.53 48.260 347.670 1776.67 1849.23 715.93 N 148.41 W 6000693.62 N 565675.82 E 0.349 576.23 2165.20 49.770 347.840 1839.42 1911.98 786.51 N 163.73 W 6000764.05 N 565659.89 E 1.584 632.72 2260.22 52.130 348.280 1899.27 1971.83 858.70 N 178.99 W 6000836.11 N 565643.99 E 2.510 690.70 2356.95 56.800 347.730 1955.48 2028.04 935.67 N 195.35 W 6000912.93 N 565626.95 E 4.850 752.4 7 2453.80 61.010 350.350 2005.49 2078.05 1017.07 N 211.07 W 6000994.19 N 565610.51 E 4.925 818.49 2548.97 64.400 347.500 2049.13 2121.69 1100.04 N 227.35 W 6001077.01 N 565593.51 E 4.446 885.68 .-" 2645.25 66.830 347.200 2088.88 2161.44 1185.59 N 246.55 W 6001162.40 N 565573.55 E 2.540 953.89 2739.90 71.360 348.060 2122.65 2195.21 1271.94 N 265.48 W 6001248.57 N 565553.86 E 4.861 1022.93 2835.56 71.920 348.190 2152.78 2225.34 1360.79 N 284.16 W 6001337.25 N 565534.40 E 0.599 1094.32 2881.03 72.150 348.340 2166.80 2239.36 1403.14 N 292.96 W 6001379.52 N 565525.23 E 0.595 1128.40 3052.18 72.140 348.040 2219.28 2291.84 1562.59 N 326.30 W 6001538.68 N 565490.48 E 0.167 1256.62 3147.98 71.590 348.730 2249.10 2321.66 1651.77 N 344.63 W 6001627.69 N 565471.37 E 0.893 1328.46 3244.34 71.370 347.880 2279.71 2352.27 1741.24 N 363.15 W 6001716.99 N 565452.06 E 0.867 1400.48 3339.79 73.200 346.810 2308.75 2381.31 1829.95 N 383.07 W 6001805.52 N 565431.35 E 2.195 1471.20 3437.26 73.830 346.580 2336.41 2408.97 1920.91 N 404.58 W 6001896.28 N 565409.04 E 0.685 1543.23 3532.50 70.790 346.400 2365.34 2437.90 2009.12 N 425.77 W 6001984.31 N 565387.07 E 3.197 1612.95 3628.85 70.460 346.880 2397.31 2469.87 2097.55 N 446.78 W 6002072.55 N 565365.29 E 0.582 1682.94 3723.48 70.270 345.720 2429.11 2501.67 2184.14 N 467.88 W 6002158.96 N 565343.42 E 1.172 1751.23 3818.22 70.600 345.930 2460.83 2533.39 2270.70 N 489.75 W 6002245.31 N 565320.80 E 0.406 1819.16 3915.43 70.010 348.560 2493.60 2566.16 2359.95 N 509.95 W 6002334.38 N 565299.81 E 2.618 1890.24 ------- ------ 12 June, 2003 - 15:23 Page 20f4 DrlllQuest 3.03.02.005 DrillQuest 3.03.02.005 Page 3 of4 12 June, 2003 - 15:23 Sperry-Sun Drilling Services Survey Report for Milne Point MPS . MPS·18PB1 MWD Your Ref: 500292313370 Job No. AKMW2289288, Surveyed: 24 February, 2003 BP EXPLORA TION (ALASKA) INC. BPXA Milne Point Unit Measured Sub-Sea Vertical Local Coordinates Global Coordinates Dogleg Vertical Depth Incl. Azim. Depth Depth Northings Eastings Northings Eastings Rate Section Comment (ft) (ft) (ft) (ft) (ft) (ft) (ft) (O/100ft) 4008.55 70.260 349.240 2525.24 2597.80 2445.89 N 526.81 W 6002420.17 N 565282.19 E 0.737 1959.83 4104.03 69.940 349.430 2557.74 2630.30 2534.12 N 543.43 W 6002508.25 N 565264.80 E 0.384 2031.59 4200.38 69.350 349.280 2591.26 2663.82 2622.90 N 560.12 W 6002596.88 N 565247.33 E 0.630 2103.80 4295.85 68.880 348.720 2625.29 2697.85 2710.45 N 577.13 W 6002684.28 N 565229.54 E 0.737 2174.77 f'-" 4390.68 68.540 349.410 2659.72 2732.28 2797.21 N 593.90 W 6002770.88 N 565212.01 E 0.767 2245.14 4486.51 68.170 350.090 2695.07 2767.63 2884.86 N 609.75 W 6002858.39 N 565195.39 E 0.764 2316.71 4583.24 68.490 349.420 2730.79 2803.35 2973.32 N 625.74 W 6002946.71 N 565178.62 E 0.724 2388.95 4677.61 68.670 349.790 2765.25 2837.81 3059.73 N 641.59 W 6003032.97 N 565162.01 E 0.412 2459.41 4772.45 69.600 349.700 2799.03 2871.59 3146.93 N 657.36 W 6003120.03 N 565145.46 E 0.985 2530.61 4868.69 70.470 348.170 2831.89 2904.45 3235.70 N 674.73 W 6003208.65 N 565127.32 E 1.746 2602.52 4964.64 70.410 348.650 2864.02 2936.58 3324.27 N 692.89 W 6003297.05 N 565108.38 E 0.476 2673.89 5058.02 71.640 348.550 2894.38 2966.94 3410.83 N 710.35 W 6003383.46 N 565090.16 E 1.321 2743.78 5152.73 72.290 347.070 2923.70 2996.26 3498.85 N 729.36 W 6003471.31 N 565070.37 E 1.637 2814.28 5248.42 72.620 346.770 2952.55 3025.11 3587.72 N 750.01 W 6003559.99 N 565048.94 E 0.456 2884.83 5344.16 69.130 348.770 2983.92 3056.48 3676.10 N 769.19 W 6003648.20 N 565028.98 E 4.145 2955.58 5439.48 69.210 348.170 3017.81 3090.37 3763.40 N 786.99 W 6003735.33 N 565010.41 E 0.594 3025.97 5533.89 68.620 347.870 3051.78 3124.34 3849.57 N 805.28 W 6003821.34 N 564991.36 E 0.692 3095.14 5631.74 68.140 347.800 3087.83 3160.39 3938.49 N 824.45 W 6003910.09 N 564971.41 E 0.495 3166.38 5726.10 67.850 348.130 3123.18 3195.74 4024.05 N 842.69 W 6003995.49 N 564952.42 E 0.447 3235.02 5884.00 67.850 348.130 3182.72 3255.28 4167.17 N 872.77 W 6004138.34 N 564921.08 E 0.000 3350.03 Projected Survey All data is in Feet (US Survey) unless otherwise stated. Directions and coordinates are relative to True North. - Vertical depths are relative to Well. Northings and Eastings are relative to Well. Global Northings and Eastings are relative to NAD27 Alaska State Planes, Zone 4. The Dogleg Severity is in Degrees per 100 feet (US Survey). Vertical Section is from Well and calculated along an Azimuth of 26.280° (True). Magnetic Declination at Surface is 25.592°(16-Feb-03) Based upon Minimum Curvature type calculations, at a Measured Depth of 5884.00ft., The Bottom Hole Displacement is 4257.59ft., in the Direction of 348.171° (True). Sperry-Sun Drilling Services Survey Report for Milne PoInt MPS - MPS-18PB1 MWD Your Ref: 500292313370 Job No. AKMW2289288, Surveyed: 24 February, 2003 BP EXPLORA TION (ALASKA) INC. Milne Point Unit BPXA Comments Measured Depth (ft) Station Coordinates TVD Northings Eastings (ft) (ft) (ft) Comment ~, 5884.00 3255.28 4167.17 N 872.77 W Projected Survey Survey tool program for MPS-18PB1 MWD From Measured Vertical Depth Depth (ft) (ft) To Measured Vertical Depth Depth Survey Tool Description (ft) (ft) 0.00 603.00 0.00 601.35 603.00 5884.00 601.35 Tolerable Gyro (MPS-18PB1 Gyro) 3255.28 MWD Magnetic (MPS-18PB1 MWD) ,-- -------.----.-- 12 June, 2003 - 15:23 Page 4 0'4 DrillQlIest 3.03.02.005 (Q) L~J fK\ C'"'t c0 - lh'1.. ~ (.r:,..... ). . è fA\-' IA" C~-f! 111\ f IA\.~ Ln~ ci)) ..- \\ IrÙ ') ~ FRANK H. MURKOWSKI, GOVERNOR AlASKA. OIL AND GAS CONSERVATION COMMISSION 333 W. "pH AVENUE, SUITE 100 ANCHORAGE. ALASKA 99501-3539 PHONE (907) 279-1433 FAX (907) 276-7542 Pat Archey Senior Drilling Engineer BP Exploration (Alaska) Inc. P. O. Box 196612 Anchorage, Alaska 99519-6612 Re: Milne Point Unit S-18i BP Exploration (Alaska) Inc. Permit No: 202-242 Surface Location: 3311' NSL, 180' WEL, SEC. 12, T12N, R10E, UM Bottomhole Location: 4666' NSL, 1667' WEL, SEC. 01, TI2N, RI0E, UM Dear Mr. Archey: Enclosed is the approved application for permit to drill the above referenced service well. This permit to drill does not exempt you from obtaining additional penTIits or approvals required by law from other governmental agencies, and does not authorize conducting drilling operations until all other required permits and approvals have been issued. In addition, the Commission reserves the right to withdraw the permit in the event it was erroneously issued. Operations must be conducted in accordance with AS 31.05 and Title 20, Chapter 25 of the Alaska Administrative Code unless the Commission specifically authorizes a variance. Failure to comply with an applicable provision of AS 31.05, Title 20, Chapter 25 of the Alaska Administrative Code, or a Commission order, or the terms and conditions of this permit may result in the revocation or suspension of the permit. Please provide at least twenty-four (24) hours notice for a representative of the Commission to witness any required test. Contact the Commission's North Slope petroleum field inspector at 659-3607 (pager). Sincerely, ~/~ Michael L. Bill Commissioner BY ORDER OF THE COMMISSION DATED this StJ. day of February, 2003 cc: Department ofFish & Game, Habitat Section w/o encl. Department of Environmental Conservation w/o encl. NC?I\- 2.-/3IfY'~ c -', STATE OF ALASKA ') ALASKJ-\ 61L AND GAS CONSERVATION COMMISSION PERMIT TO DRILL 20 AAC 25.005 1 b. Type of well 0 Exploratory 0 Stratigraphic Test 0 Development Oil II Service 0 Development Gas 0 Single Zone 0 Multiple Zone 5. Datum Elevation (DF or KB) 10. Field and Pool Planned KBE = 721 Milne Point Unit / Schrader 6. Property Designation t,p¿, Bluff ADL J.10/ð1 7. Unit or Property Name 1 a. Type of work II Drill 0 Redrill ORe-Entry 0 Deepen 2. Name of Operator BP Exploration (Alaska) Inc. 3. Address P.O. Box 196612, Anchorage, Alaska 99519-6612 4. Location of well at surface 3311' NSL, 180' WEL, SEC. 12, T12N, R10E, (As Staked) At top of productive interval 4541' NSL, 1611' WEL, SEC. 01, T12N, R10E, UM At total depth 4666' NSL, 16671 WEL, SEC. 01, T12N, R10E, UM 12. Distance to nearest property line 13. Distance to nearest well ADL 380110,1661' MD No Close Approach 16. To be completed for deviated wells Kick Off Depth 275' MD Maximum Hole Angle 18. Casin~ Program Specifications $Ize Casina WeiQht Grade CouolinQ 20" 92# H-40 Welded 9-5/8" 40# L-80 BTC 7" 26# L -80 BTC Hole 42" 12-1/4" 8-1/2" Lenath 112' 2683' 8719' 11. Type Bond (See 20 AAC 25.025) 8. Well Number / MPS-18i 9. Approximate spud d~ 02/17103 Amount $200,000.00 /' 14. Number of acres in property 15. Pro~sed depth (MD and TVD) 2560 8749' MD / 4466' TVD o 17. Anticipated pressj!te {see 20 AAC 25.035 (e) (2)} 70 Maximum surface 1419 psig, At total depth (TVD) 43291 11852 psig Setting Depth TQp Botom MD TVD MD TVD Surface Surface 112' 112' 30' 30' 2713' 22001 301 30' 8749' 4466' Number 2S100302630-277 Quantitv of Cement (include staae data) 260 sx Arctic Set (Approx.) 553 sx PF 'Ll, 222 sx Class 'GI 74 sx PF 'E', 171 sx Class 'GI ./ /' 19. To be completed for Redrill, Re-entry, and Deepen Operations. Present well condition summary Total depth: measured feet Plugs (measured) true vertical feet Effective depth: measured feet Junk (measured) true vertical feet Casing Length Size Structural Conductor Surface Intermediate Production Liner Perforation depth: measured true vertical Cemented MD TVD RECEIVED DEC 11 2002 Alaska Oil & Gas Gons. Commlssiorl Anchorage 20. Attachments II Filing Fee 0 Property Plat 0 BOP Sketch 0 Diverter Sketch II Drilling Program II Drilling Fluid Program 0 Time vs Depth Plot 0 Refraction Analysis 0 Seabed Report 0 20 AAC 25.050 Requirements Contact Engineer NameINumber: Matt Green, 564-5581 Prepared By NameINumber: Sandra Stewman, 564-4750 21. I hereby certify that the fo....=r~oin~ true a¡f correct to the best of my ~nowl~~ge . I I I Signed Pal Archey 3 ~ ~þ~:; ~:g Engl~:er,,;,~; Date I 2 '. 10 I 0 ~ Permit Number API Number. Approv.al ~tEh., See cover letter ~ ()2 - :J. t¡ .:2- 50- 029' -- 2.5 J .$ 3 I,f t;". 0 ~/ for other reQuirements Conditions of Approval: Samples Required 0 Yes 181 No Mud Log Rec uir d 0 Yes 1:81 No Hydrogen Sulfide Measures 0 Yes .ŒI No Directional Survey Required 18 Yes 0 No Require!. Working Pre~su.re for BOPE q 2K D3K D4K, 0 5K 19 10K D15K ,0 3.5K psi for CTU Other: l~+ BOÞE f.ð Š500 rOSe" µtI:,) <:t,{..<..T h~"'~j loc'l rt'1-,l-('lŸ'-ed. OKIGINAl SIGNED BY bV order oft J V r ~ Approved By M l. Bill Commi~sioner the commission Date I~ rJ f)0 I=orm 10-401 Rev. 12-01-85 ' . I Submit n ~iPlicate ~, ~, ' ~ :,:.....¿.' . ') Schrader B. )s-pad Program MPS-18i Permit I Well Name: MPS-18i Drill and Complete Program Summary I Type of Well (service I producer I injector): Injector Surface Location: 19681 FNL, (33111 FSL), 1801 FEL, (51001 FWL), SEC. 12, T12N, R10E X=565830.49 Y=5999978.96 7331 FNL, (45471 FSL), 16111 FEL, (3669' FWL), SEC. 1, T12N, R10E X=564342 Y =6006481 Z=4,329 TVDrkb 6141 FNL, (4666' FSL), 16671 FEL, (3613' FWL), SEC. 1, T12N, R10E X=564285 Y =6006600 Z = 4,466 TVDrkb I AFE Number: I TBD I Ria: I Doyon 14 ./ I Estimated Start Date: 1 17 Feb 2003 I Operatina days to complete: 111.0 I MD: 18,749 I I TVD: 14,466 I I Max Inc: 170 I I KOP: 1275 I I KBE: 172.0 I Well Design (conventional, slim hole, etc.): I Conventional Grass Roots Water Injector .¡ I Target Start Location: "OB" Bottom Hole Location: / I Objective: I Schrader "OA", "08" Mud Program 12.25-in Surface Hole Mud Properties: Density (ppg) Funnel visc VP HTHP 8.8 - 9.2:;> 75 - 150 25 - 60 N/A Spud - LSND Freshwater Mud pH API Filtrate LG Solids 8.5 - 9.5 < 8 < 6.5 8.5-in Intermediate Hole Mud Properties: Density (pPQ) PV VP HTHP 8.9-9.2 './ 10-20 20-28 N/A LCM Restrictions: None Waste Disposal: NO ANNULAR INJECTION. Drill Cuttings taken to 08-4 disposal site Call the Pad 4 waste disposal site prior to truck leaving location so the site can be ready to unload waste. Exempt liquid wastes can be taken to DS-4 or Phillips KRU 1 R. LSND Freshwater Mud pH API Filtrate LG Solids 8.5 - 9.0 < 8 < 6.5 1 ') Schrader Bluff" )d Pro~ram MPS-18i Permit Cement Program Casing 9.625-in 40-lb/ft L-80 BTC surface casing Size Basis 250% excess over gauge hole in permafrost interval. 40% excess over gauge hole below permafrost. Top of tail cement 500-ft MD above casing shoe. Total Cement Wash 20-bbl Water Spacer Vol: 455-bbl Tail 50-bbI10. b/gal un-viscosified Alpha spacer 409-bbl, n_sx 10.7-lb/gal Permafrost L - 4.15 fe/sx (cemen . OJ surface) 46-bbl, ??2'-sx 15.8-lb/gal Premium G - 1.15 ft;j/sx to of H at 2,213-ft MD BHST ::= 55°F from SOR, BHCT 60°F estimated by Halliburton Spacer Lead Temp Casing Size Basis 7.0-in 26-lb/ft L-80 BTC intermediate casing Top of lead cement 500-ft above top of Ugnu-sand. 0% excess over gauge. Top of tail cement 500-ft MD above top of N-sand. 400/0 excess over gauge. Total Cement Wash 20-bbl Water Vol: 70-bbl Spacer -Ib/gal un-viscosified Alpha Spacer Lead -sx 12.0-lb/gal Permafrost E - 2.17 fe/sx (top of at 6,471-ft MD) Tail 35-bbl, 7 "..sx 15.8-lb/gal Premium G - 1.15 ft;j/sx of ail at Temp BHST ::= 80°F from SOR, BHCT 70°F estimated by Halliburton Evaluation Program 12.25-in Hole Section: Open Hole: MWD/GRlRES IFRlCASANDRA Cased Hole: None 9.875-in Hole Section: Open Hole: MWD/GRlRES I FRlCASANDRA Cased Hole: SCMT 2 ) Formation Markers Formation Tops Base Permafrost TUZC NA NB NC NF Top OA Base OA Top OB Base OB * Based on 55 depths MDrkb (ft) 2018 6971 8246 8289 8339 8440 8477 8520 8558 8599 TVDrkb (ft) 1822 3647 4127 4152 4182 4247 4272 4302 4329 4358 Casin~JTubing Program Hole Size Csg / WtlFt Gr~e Tbg O.D. 42-in 20-in* 92# H-40 æ 9.625 40# L-80 . In 7.0-in 26# L-80 *e 20-in conductors are insulated! Schrader Bluff. :,1d Pro~1ram MPS-18i Permit co," Welded BTC BTC Pore Pressure (psi) 1764 1775 1788 1816 1827 1840 1852 Length 80' 2,683' 8,719' Recommended Bit Program BHA Hole Size Depth (MD) Bit Type 1 2 1 ~€.' 6-in &n 0' - 2,713' 2,713' - TD Smith FGXI Smith FGS+ 3 Estimated EMW (Ib/gal)* 8.35 8.35 8.35 8.35 8.35 8.35 8.35 Top MD / TVDrkb 0' 30' 30' Nozzle/Flow rate 3-15 & 1-1 0 3-15 & 1-1 0 ~,~. Bottom MD / TVDrkb 112' / 112' 2,713' /2,200' 8,749' /4,466' ) Schrader Bluff 1d Pro~uam MPS-18i Permit Well Control: Surface hole will be drilled with a diverter. Intermediate hole: · Maximum anticipated BHP: · Maximum surface pressure: 1 ,852-psi fìJ 4,329-ft TVDrkb - Top of "OB" 1 ,419-psi @ surface (Based on BHP and a full column of gas from TO @ O.1-psi/ft~ / 3,500-pSI. An FIT to 11.5-lb/gal will be made on the 7.0-in casing shoe. 83.7-bbl with 9.2-lb/gal mud and FIT of 11.5-lb/gal @ 9.625-in casing shoe. 9.8-lb/gal brine /7.0-lb/gal Diesel (1 ,800-ft MD) · Planned BOP test pressure: · Integrity test: · Kick tolerance: · Planned completion fluid: Drilling Hazards & Contingencies: Hydrates · Hydrates have not yet been seen on S pad, but have been encountered in the surface holes on other pads, especially nearby H-Pad. Hydrates generally occur just below the permafrost (+/- 1 ,800-ft TVDss) but may be present in shallower SV sands and also as deep as 3,OOO-ft. Be alert for the possibility of shallow gas and/or hydrates. Use recommended practices for drilling hydrates. · Watch out for deeper gravels below the permafrost or gravels that calve off within the permafrost and tend to drop out when the aerated hydrate gas cut mud is being circulated out. Maintain adequate viscosity. In the past, several Milne Pt wells have experienced stuck pipe from this situation. Lost Circulation · Offset wells encountered losses while running and cementing casing and only one well had losses while running a hole opener. Below is a list of the wells and the lost circulating problems associated with them. We do not expect losses while drilling this well. · MPS-27: Lost returns cementing 7.0-in casing at approx. 800-ft MD. SuccessfuI1.O-in top job. · MPS-21: Lost returns cementing 7.0-in casing. Used TAM port collar at 1 ,OOO-ft with still no returns. SuccessfuI1.O-in top job. · H-06 (1995): Lost 100-bbl running 9-5/8" casing, good returns during cementing except no returns for last 20-bbl, contaminated cement to surface, cement 12 ft down, no top job. · H-05 (1995): Lost returns drilling at 5,360-ft (3,700-ft TVD), 40-bph to keep full, treated w/ LCM pills for two days, total losses 838-bbl, made hole opener run with some continued losses. · H-05 (1995): Ran 9-5/8" casing, lost 46-bbl conditioning mud. · H-07 (1995): Lost 50-bbl running 9-5/8" casing. 4 ) Schrader Bluff \. -.~d ProQram MPS-18i Permit · E-24 (1998): Made hole opener run, worked tight spots 1965, 2620, 3465, 5900 and 6000, lost 72-bbl while circulating. · H-08A (1997): Had some minor losses while running 4-1/2" liner. · Follow the LOST CIRCULATION DECISION MATRIX in the well program if fluid losses occur while drilling. Break circulation slowly in all instances and get up to recommended circulating rate slowly prior to cementing. Expected Pressures · It is unlikely there will be unexpected overpressure when drilling to the Schrader Bluff formation. Reservoir pressure is expected to be (8.35 Ib/gal EMW). In this well, the Schrader Bluff formation will be drilled with 9.1 to 9.2-lb/gal mud. · Flow-check the well when the reservoir is entered. Pad Data Sheet · Please read the MPU S-Pad Data Sheet thoroughly. Breathing · N/A Hydrocarbons · Hydrocarbons will be encountered in the Ugnu through the Schrader Bluff. Free Gas may be encountered below the Upper Ugnu. Faults · A 35-ft down to SE fault will be crossed in the Ugnu formation at 3,950-ft TVDss. · Well is being drilled into a complex structural area. The area is at the edge of both the Milne and NW Eileen surveys, causing poor seismic resolution. The well is placed at the southwestern edge of the graben to maximize the distance between S-18i and S-19A. · There is a region SW of the landing point where there appears to be a 20-ft D to the NE fault. However, the exact location of this fault is difficult to identify. It does not appear that this fault is in communication with any existing wells. There is a D to the NW northeast striking fault southeast of the landing point which is also planned to be crossed by MPS-19A. It is difficult to predict if this will provide a fluid conduit from S-18i into S-19A. · There is a 40-ft fault just NE of MPH-OBB that may provide a fluid boundary between S-18i and H-08B. Again, due to poor seismic imaging, it is difficult to tell the continuity of this fault system. Hydrogen Sulfide · Milne Point S-Pad is not designated as an H2S Pad. / Anti-collision Issues · None, except for consideration of planned wells. 5 ) Schrader Bluff, '1d ProQram MPS-18i Permit DRILL & COMPLETION PROCEDURE Drillinq 1. MIRU Doyon 14, NU diverte/" 2. Drill 12.25-in hole to 2,713-ft as per directional plan. 3. Rig up and run 9.625-in 40-lb/ft, L-80, BT&C casing and cement in place. 4. ND di~,~rt~·IfNU BSh~ / 5. Drill ~n hole to TD as per directional plan. 6. Sidewall core run. 7. Rig up and run 7.0-in 26-lb/ft, L-80, BT&C casing and cement in place. ,,/ 8. Run SCMT log. / 9. Test casing to 3,500-psi 10. Perforate well in OA and OB sands. 11. Run 2.375-in dual completion. / 12. Test packer to 350Q-psi 13. Install tubing head and Christmas tree. 14. RD Doyon 14. ,/" /' / Spinner survey to be done after rig moves off of location. 6 OA Perfs/' _ 8480- - 8510' MD' - OS Perfs; 8560- 85901 MD III I illi :::; ~ ~ 1'11"· ¡¡i¡': r .~. I: P' r .'1;:. ~ ti . R' :~ - '~ ~l a ~. .~.. 1: r ;t .~ ,! ~ J :~ ~~ ~ ~, " '; ~ ~ I t ;!¡ ~- ' ~, ~ tr..:' [' i ~í ~ ~ ~: ~ '1 :~ :': ~ i,~,:, i,:' Ii 1 " f Ie ~... ~ : ' ~~ ~ '1· ~ .!~ ~ :' ~j ~ ;,,1, '~ ~ 11 .. ' ~ fi _.1 r !I I . ~ '~,. ~"I ,~~. '! i ~ ' . ,~," r ~,i !' ~ ~~ ~! ,j I I~ 'i I)! ¡ , ~ º. ' ,,".',: , . ,',:.~;. I' ; .~' ..~ ~ ;f ~: fi r ~ ~ · í ~ ~ ~! æ '~ ~ ~- - L Proposed MPS-Hs ~ual string completion 20" 92# H-40 WELDED CONDUCTOR @ 112' MD/TVD 2-3/8" 'X' nipples (set at - 2200' MD) 2-3/8" 4.7# L80 1ST tubing strings ~ 9-5/8" 40# 1-80 ST&C @ 2713' MD/2200' TVD 7'1 x 2-3/8" Saker GT dual packer (set at - 84501 MD) 2-3/8" 4.7# L80 1ST pup jt (-10') 2-3/8" 'X' nipple with 1.875" no-go 2-3/8" 4.7# L80 1ST pup jt (-10') Re-entry guide 7'1 x 2-3/8" Saker FH packer (set at -85301 MD) 2-3/8" 4.7# L80 1ST pup jt (-101) 2-3/8" 'XI nipple with 1.875" no-go 2-3/8" 4.7# L80 1ST pup jt (-10') Re-entry guide 7" 26# L-80 ST&C @ 8749' MD/4466' TVD 2-3/8" Dual Strings with dedicated OA and 08 injection. Date: 12110/2002 Date: Date: Plan: MPS-18 wp05 (plan MPS-18lPlan MPS-18 Created By: Ken AIlen Tool CB-GYRO-SS MWD+IFR+MS SURVEY PROGRAM DepthFm Depth To SwveylP13n 33.00 1100.00 Planœd: MPS-18 wpOS V14 1100.00 8148.61 Planœd: MPS-18 1>'»05 V14 REFERENCE INFORMATION Co-ocdinate (NIE) Relen:nce: Wen C.-: Plan MPS-18. True North Vertical (IVD) Reference: S-Pad Dev 72.00 Section (VS) Reference: Slot· (O.ooN.O.ooE) Measured Depth Reference: S-Pad Dev 72.00 CakuJation MethxI: Mioirmm euva.... COMPANY DETAILS OP Amoco Minimum Cm'3hI'C ISCWSA T faV Cylir"J.,r Nonh r~liplical + Casing Rules Oased bp WELL DETAILS Name +NI-S 4Y-W No.1hiog Easûog LatilUde Longitude Slot Plan ~JPS..1 553 -51453 5999978.96 565830.49 70"24'37383N 14<nT50.252W NJA T ARGIIT DETAILS Name TVD +NI-S 4Y-W No.1hiog Eastiog Shape Psyduck (OB) 4329.00 651553 ·1431.26 600648LOO 564342.00 Polygon SECTION DErAILS Sec MD Inc Azi TVD +N/-S +FJ-W DLeg TFace VSec Target I 33.00 0.00 0.00 33.00 0.00 0.00 0.00 0.00 0.00 2 275.00 0.00 0.00 275.00 0.00 0.00 0.00 0.00 0.00 3 408.33 2.00 348.1 0 408.31 2.28 -0.48 1.50 348.10 2.33 4 1441.67 33.00 348.10 1381.84 302.63 -63.77 3.00 0.00 309.25 5 1941.67 45.50 348.10 1768.27 611.57 -128.88 2.50 0.00 624.95 6 2089.67 45.50 348.1 0 1872.00 714.87 -150.65 0.00 0.00 730.51 7 2705.30 70.13 348.10 2197.42 1220.77 -257.27 4.00 0.00 1247.48 8 7851.88 70.13 348.10 3947.08 5956.76 -1255.48 0.00 0.00 6087.13 ~..d 9 8558.29 44.00 335.00 4329.00 6515.53 -1431.26 4.00 -160.58 6670.82 Psyduck (OB) 10 8598.61 44.00 335.00 4358.00 6540.91 -1443.10 0.00 0.00 6698.17 II 8748.61 44.00 335.00 4465.90 6635.34 -1487.13 0.00 0.00 6799.95 Checked: Reviewed: Size CASING DErAILS MD Name TVD No. Cakulalioo Method: ~;~~~ Error Surface: Wamin¡¡ Mctbod: All TVD depths are ssTVD plus 72'for RKBE. 9.625 7.000 BPRF SBF2-NA SBFI-NB SBE4-NC SBEI-NF TSBD-OA TSBC TSBB-OB TSBA5 (base OB) 95/8' 7" FORMATION TOP DErAILS 1822.00 4127.00 4152.00 4182.00 4247.00 4272.00 4302.00 4329.00 4358.00 Fonnation TVDPath MDPath 2018.33 8245.71 8288.86 8338.58 8439.95 8477.02 8520.32 8558.29 8598.61 2712.88 8748.60 2200.00 4465.89 No. I 2 3 4 5 6 7 8 9 I 2 1.5/100' : 275' MD, 275'TVD 408.33' MD, 408.31 'TVD Start Di 800 "~ 7851.88' MD, 3947.08'TVD SBF1-NB ! I ~ ,..:.;,:.:. I lÇ;: B) 'P05 [9. I , I , I 6400 7200 . ~~~¡¡ 2IJ' MD. I I T ('ul [)"plh I . I 5öOf) D, End 7[1110 l: I I: JiP, I. I#, l' ;- I ..........'.1 ... ,. -I .. I .... I I '''·1 ! ... ¡ m I :1 :1 I HI I I 4800 ,¿;:. ! 1 ¡ I I I I I I 3200 4000 Vertical Section at 347.37° [800ft/in] / - , 1441.67' MD, 1381.84'TVD d Dir : 1941.67' MD, 1768.27' TVD Start [ 2089.67' MD, 1872'TVD 2705.3' MD, 2197.42' TVD ;.... ~I I; I I ¡ 800 2400 1600 ~ ¢: ~ .c i5.. Ö -¡;j 'E 2400 > 2 f- 3200 4000 Plan: MPS-18 wp05 (plan MPS-l8lPlan MPS-18 Created By: Ken All... Date: 12110/2002 Checked : Date: Reviewed: Date: SURVEY PROGRAM Depth Fm Depth To SurveylPlan Tool 33.00 1100.00 PIamed: MPS-18 wpOS V14 CB-GYRO-SS 1100.00 8748.61 PIamed: MPS-18 wp05 VI4 MWDi-1FR+MS REFERENCE INFORMATION Co-ordinate (NIE) Relèreoœ: Wen Ceme: Plan MPS-18. True North VerûcaI (\VD) Refen:nce: S-Pa<! Dev 72.00 Section (VS) Reference: Slot - (O.ooN,O.ooE) Measuæd Depth Refeœoce: S-Pa<! Dev 72.00 Calculation Metb:>d: Mininnm Culvature COMPANY DETAII.S BP Amoco Minimœ1 CurvaIUf\:' ISCWSA Trav Cylind.:,. North I~lirtical + Casing Rules Based O~p .. .. WELL DEIAILS NaJœ +NI-S +EJ·W Northing Easting I.atituœ Loogitude Slot Plan t.1PS· 5.53 -51453 5999978.96 565830.49 70"24'37383N 149"21'50.252W NlA I ARGET DEI AILS NaJœ lVD +NI-S +EJ-W Northing Easling Shape Ps)·duçk (OB) 4329.00 6515.53 -1431.26 6006481.00 564342.00 Polygon SECTION DErAILS See MD lne Azi TVD +N/-S +FJ-W DLeg TFaee VSee Targe 1 33.00 0.00 0.00 33.00 0.00 0.00 0.00 0.00 0.00 2 275.00 0.00 0.00 275.00 0.00 0.00 0.00 0.00 0.00 3 408.33 2.00 348.10 408.31 2.28 -0.48 1.50 348.10 2.33 4 1441.67 33.00 348.10 1381.84 302.63 -63.77 3.00 0.00 309.25 5 1941.67 45.50 348.10 1768.27 611.57 -128.88 2.50 0.00 624.95 6 2089.67 45.50 348.10 1872.00 714.87 -150.65 0.00 0.00 730.51 7 2705.30 70.13 348.10 2197.42 1220.77 -257.27 4.00 0.00 1247.48 8 7851.88 70.13 348.10 3947.08 5956.76 -1255.48 0.00 0.00 6087.13 -- 9 8558.29 44.00 335.00 4329.00 6515.53 -1431.26 4.00 -160.58 6670.82 Psyduek (OB) 10 8598.61 44.00 335.00 4358.00 6540.91 -1443.10 0.00 0.00 6698.17 11 8748.61 44.00 335.00 4465.90 6635.34 -1487.13 0.00 0.00 6799.95 FORMATION TOP DErAILS TVDPath MDPath Formation BPRF SBF2-NA SBFI-NB SBE4-NC SBE1-NF TSBD-OA TSBC TSBB-OB TSBA5 (base OB) Size 9.625 7.000 CASING DErAILS MD Name 95/8' 7" 2018.33 8245.71 8288.86 8338.58 8439.95 8477.02 8520.32 8558.29 8598.61 2712.88 8748.60 1822.00 4127.00 4152.00 4182.00 4247.00 4272.00 4302.00 4329.00 4358.00 TVD 2200.00 4465.89 No. I 2 3 4 5 6 7 8 9 No. I 2 MD, 4465.9' TVD 4/100' : 7851.88' MD, 3947.08'TVD TVD 8748.61 8558.29' MD, 4329' Calculalioo M.1)IOd: ~~=~ Error Surl"acc: Wamilljl Metbod: 6600 5500 '- ~ooo /I;' ~~ ..../000 ~ ~ o ,rI I I ."rI I I ~ ~ , All TVD depths are ssTVD plus 72'for RKBE. 138 I. 84'TVD Start Dir 3/100' : 408.33' MD, 408.31 'TVD Start Dir 1.5/100': 275' MD, 275'TVD MD, : 2089.67' MD, 1872'TVD 1941.67' MD, 1768.27' TVD I 100 TVD 1441.67' MD, 2197.42' 2705.3' 100 0 West(-)/East(+) [I 100ft/in] I -2200 4400 3300 2200 00 o :s ¢: o o :;:- :é t:: ~ :é g (/) . .. .. .,.. ~. . .. ,ÇOIIlP~JlY: Fiêlti: . .... W ··W~lIpath: ... E3F? ~rpoqq·. Milne Point· . . MPt$ Pad < .. , ¡::ilåhMI?~'8' Plåh lV1PS"-18 " ) ) BP KW A Planning Report MAP p~~e:1?t191?002 .. ., . ··TiÏ11e:Qª;~9:~g· ,. .. ·.....··.Pa.g~:· I' .. G~ror9iJ:..~~e~:E)~~f~r~në~: ·\lVØn;AIªn'Me~F18 TrueN9rtlt·· .. ~~r*i~~~¡.ÇJjyD):~ef~~~l1çei " .... ~h~. ~d g~y. ~2..·R .,'........ . .'. .., .. . '. .... ..., .. . .s~t49~.(Y~)i~efer~l1ç~: ... . vv~n·w;QP~,()~gQ~,·~47.37AiI} ..... i Sun,reYÇa.lçulatl,øli Met~od: Miniml.lmquryatLu'e . . . Db: ."()fåcl~· Field: Milne Point North Slope UNITED STATES Map System:US State Plane Coordinate System 1927 Geo Datum: NAD27 (Clarke 1866) Sys Datum: Mean Sea Level Map Zone: Coordinate System: Geomagnetic Model: Alaska, Zone 4 Well Centre BGGM2002 Site: M pt S Pad Site Position: From: Map Position Uncertainty: Ground Level: Well: Plan MPS-18 Northing: Easting: 5999978.00 ft 566345.00 ft Latitude: Longitude: North Reference: Grid Convergence: 70 24 37.329 N 149 27 35.171 W True 0.51 deg 0.00 ft 0.00 ft Slot Name: Well Position: +N/-S 5.53 ft Northing: 5999978.96 ft Latitude: +E/-W -514.53 ft Easting: 565830.49 ft Longitude: Position Uncertainty: 0.00 ft 70 24 37.383 N 149 27 50.252 W Wellpath: Plan MPS-18 Current Datum: Magnetic Data: Field Strength: Vertical Section: S-Pad Dev 6/29/2001 57460 nT Depth From (TVD) ft 0.00 Drilled From: Tie-on Depth: Above System Datum: Declination: Mag Dip Angle: +E/-W ft 0.00 Well Ref. Point 0.00 ft Mean Sea Level 26.28 deg 80.78 deg Direction deg 347.37 Height 72.00 ft +N/-S ft 0.00 Principal: Yes Plan: MPS-18 wp05 Date Composed: Version: Tied-to: 12/10/2002 14 From: Definitive Path Casing Points .··MD ft 2712.88 8748.60 Formations l\1Ï> ft 2018.33 8245.71 8288.86 8338.58 8439.95 8477.02 8520.32 8558.29 8598.61 Targets TVD ft 2200.00 4465.89 TVD ft 1822.00 4127.00 4152.00 4182.00 4247.00 4272.00 4302.00 4329.00 4358.00 Name Psyduck (OB) -Polygon 1 -Polygon 2 -Polygon 3 -Polygon 4 -Plan hit target . Diameter . in 9.625 7.000 12.250 8.500 95/8" 7" Formations· Dipþirection dèg 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 Dip ^ng~e deg 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 BPRF SBF2-NA SBF1-NB SBE4-NC SBE1-NF TSBD-OA TSBC TSBB-OB TSBA5 (base OB) Map Map <- Latitude --> <- Longitude -> Description TVD +N/-S +E/-W Northing Easting Deg Min Sec Deg Min Sec Dip. Dir. ft ft ft ft ft 4329.00 6515.53 -1431.26 6006481.00 564342.00 70 25 41.460 N 149 28 32.240 W 4329.00 6246.18 -1395.63 6006212.00 564380.00 70 25 38.812 N 149 28 31.193 W 4329.00 6691.74 -1565.73 6006656.00 564205.99 70 25 43.193 N 149 28 36.186 W 4329.00 6743.86 -1465.25 6006709.00 564306.00 70 25 43.706 N 149 28 33.238 W 4329.00 6365.97 -1256.55 6006333.00 564518.00 70 25 39.990 N 149 28 27.114 W Ç'9~pånr: !"i~i4: . $it~f ...... ..... · Wêìï~¡: . .. . · "WèU~~~Il:! ) ) BP KW A Planning Report MAP eÄ.Ampqq '. tV1iIþe'1p(jiri( .... MP( ßpâd ... plan Mþ$l t~. , Alâh'¡VIP$.,t8 .... . .. ... . ...... . .. . . ,". . . Tb11e: ....þ~:?$:32 ... ." .... .¡... ¡.. .¡.. .. ., .¡.) .......... ~~g~:2. .\i'VeH:Þli:lriI\llP$~;18;·TfUeNorth . L)$"PätlPey!?:q.·. ......... ....... ... .........! .. ...... ... ..'.. ..... ·~·:::::~~.I~:: (p·~:qP:~.!!q~pp:~)~~4rt~.~·r~9.··!~·J ...... ......... ... . :: Minimum Curvature . ...... ··J)b: c>råèl~L Plan Section Information 33.00 275.00 408.33 1441.67 1941.67 2089.67 2705.30 7851.88 8558.29 8598.61 8748.61 Survey 33.00 100.00 200.00 275.00 300.00 408.33 500.00 600.00 700.00 800.00 900.00 1000.00 1100.00 1200.00 1300.00 1400.00 1441.67 1500.00 1600.00 1700.00 1800.00 1900.00 1941.67 2000.00 2018.33 2089.67 2100.00 2200.00 2300.00 2400.00 2500.00 2600.00 2705.30 2800.00 2900.00 3000.00 3100.00 3200.00 3300.00 3400.00 0.00 0.00 2.00 33.00 45.50 45.50 70.13 70.13 44.00 44.00 44.00 0.00 0.00 348.10 348.10 348.10 348.10 348.10 348.10 335.00 335.00 335.00 Incl· . deg 0.00 0.00 0.00 0.00 0.38 Azini ·.deg' 0.00 0.00 0.00 0.00 348.10 2.00 348.10 4.75 348.10 7.75 348.10 10.75 348.10 13.75 348.10 16.75 348.10 19.75 348.10 22.75 348.10 25.75 348.10 28.75 348.10 31.75 348.10 33.00 348.10 34.46 348.10 36.96 348.10 39.46 348.10 41.96 348.10 44.46 348.10 45.50 348.10 45.50 348.10 45.50 348.10 45.50 348.10 45.91 348.10 49.91 348.10 53.91 348.10 57.91 348.10 61.91 348.10 65.91 348.10 70.13 348.10 70.13 348.10 70.13 348.10 70.13 348.10 70.13 348.10 70.13 348.10 70.13 348.10 70.13 348.10 33.00 275.00 408.31 1381.84 1768.27 1872.00 2197.42 3947.08 4329.00 4358.00 4465.90 tVD · ft. 33.00 100.00 200.00 275.00 300.00 408.31 499.81 599.20 697.89 795.60 892.07 987.03 1080.22 1171.38 1260.27 1346.65 1381.84 1430.35 1511.54 1590.11 1665.91 1738.79 1768.27 1809.15 1822.00 1872.00 1879.22 1946.23 2007.90 2063.93 2114.05 2158.02 2197.42 2229.62 2263.61 2297.61 2331.61 2365.60 2399.60 2433.60 0.00 0.00 2.28 302.63 611.57 714.87 1220.77 5956.76 6515.53 6540.91 6635.34 . ~ys TYD] . (t -39.00 28.00 128.00 203.00 228.00 336.31 427.81 527.20 625.89 723.60 820.07 915.03 1008.22 1099.38 1188.27 1274.65 1309.84 1358.35 1439.54 1518.11 1593.91 1666.79 1696.27 1737.15 1750.00 1800.00 1807.22 1874.23 1935.90 1991.93 2042.05 2086.02 2125.42 2157.62 2191.61 2225.61 2259.61 2293.60 2327.60 2361.60 . .. .. . .... .... . .. +~~w : '.. :d~~fq9ft.8~~~11~q9ft:d]t~t()()ft .., 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 -0.48 1.50 1.50 0.00 -63.77 3.00 3.00 0.00 -128.88 2.50 2.50 0.00 -150.65 0.00 0.00 0.00 -257.27 4.00 4.00 0.00 -1255.48 0.00 0.00 0.00 -1431.26 4.00 -3.70 -1.85 -1443.10 0.00 0.00 0.00 -1487.13 0.00 0.00 0.00 'i\.fapN ft 5999978.96 5999978.96 5999978.96 5999978.96 5999979.04 5999981.23 5999986.50 5999997.13 6000012.83 6000033.55 6000059.23 6000089.81 6000125.20 6000165.30 6000210.01 6000259.20 6000280.99 6000312.62 6000369.61 6000430.01 6000493.70 6000560.55 6000589.32 6000629.95 6000642.71 6000692.40 6000699.63 6000772.08 6000848.93 6000929.79 6001014.27 6001101.96 6001197.30 6001284.27 6001376.11 6001467.95 6001559.79 6001651.62 6001743.46 6001835.30 565830.49 565830.49 565830.49 565830.49 565830.47 565829.99 565828.83 565826.49 565823.04 565818.48 565812.83 565806.11 565798.32 565789.50 565779.67 565768.85 565764.06 565757.10 565744.56 565731.28 565717.27 565702.56 565696.24 565687.30 565684.49 565673.56 565671.98 565656.04 565639.13 565621.35 565602.76 565583.47 565562.50 565543.36 565523.16 565502.96 565482.75 565462.55 565442.34 565422.14 1;FQ . ·ß~g.·· 0.00 0.00 348.10 0.00 0.00 0.00 0.00 0.00 -160.58 0.00 0.00 Psyduck (OB) 0.00 0.00 0.00 0.00 0.08 nLS· !. TF(): ;deg/1000··. d~g' 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 1.50 0.00 CB-GYRO-SS CB-GYRO-SS CB-GYRO-SS CB-GYRO-SS CB-GYRO-SS 2.33 1.50 7.72 3.00 18.61 3.00 34.68 3.00 55.89 3.00 82.19 3.00 113.50 3.00 149.74 3.00 190.80 3.00 236.58 3.00 286.95 3.00 309.25 3.00 341.64 2.50 400.00 2.50 461.84 2.50 527.05 2.50 595.51 2.50 624.95 2.50 666.56 0.00 679.63 0.00 730.51 0.00 737.90 4.00 812.09 4.00 890.78 4.00 973.58 4.00 1060.08 4.00 1149.87 4.00 1247.48 4.00 1336.53 0.00 1430.57 0.00 1524.61 0.00 1618.64 0.00 1712.68 0.00 1806.71 0.00 1900.75 0.00 Tòol/Comment ,. 0.00 CB-GYRO-SS 0.00 CB-GYRO-SS 0.00 CB-GYRO-SS 0.00 CB-GYRO-SS 0.00 CB-GYRO-SS 0.00 CB-GYRO-SS 0.00 CB-GYRO-SS 0.00 MWD+IFR+MS 0.00 MWD+IFR+MS 0.00 MWD+IFR+MS 0.00 MWD+IFR+MS 0.00 MWD+IFR+MS 0.00 MWD+IFR+MS 0.00 MWD+IFR+MS 0.00 MWD+IFR+MS 0.00 MWD+IFR+MS 0.00 MWD+IFR+MS 0.00 MWD+IFR+MS 180.00 MWD+IFR+MS 180.00 BPRF 180.00 MWD+IFR+MS 360.00 MWD+IFR+MS 360.00 MWD+IFR+MS 360.00 MWD+IFR+MS 360.00 MWD+IFR+MS 360.00 MWD+IFR+MS 360.00 MWD+IFR+MS 360.00 MWD+IFR+MS 0.00 MWD+IFR+MS 0.00 MWD+IFR+MS 0.00 MWD+IFR+MS 0.00 MWD+IFR+MS 0.00 MWD+IFR+MS 0.00 MWD+IFR+MS 0.00 MWD+IFR+MS \ \) " BP KW A Planning Report MAP .·,Ç9~p~ny:< :J{i~lcJ: :.. . ~ite:' .: Well: ..,... W¢ïJpå*~; : Survey ßP, Ampçö: ." Mil6epdiot .. M~!$ 'F>ø~. .. . . PlanMI?S;1ß PlañMPS~18; . . .. . ... . ::-. .": ..::. :. .::....::- :, :"." "".::."' p~~e:1 ~ï1P{?Pº~ .,. ,.< .... ..'I'jijt~~L Øß;25:~~ .,., .... ,. '."..".. ,.. ..., .;.J~ag~: .', ';3 .. q?t()r~i~~t~~~)~~(~r~~ç~:;;;.\W~,I:P.I~nMP$~18, rrue~()rth.. .;. Y~r~~cal(1,'YI»~~f~~~~:f~: :,..... ...' $+l?ádP.$y!~iO ...., . . ., . ,.....,. ... '......,Se¢~i~n (YS)l{d~r~~~~: '.. ... ..:,::; Wéll(O;qor'r;o;oqE;~47 .37~¡r .;... '.".. :$urretÇIlI~~iatîº~Metþod:: ..... Minimuh1QUrvaturè·l)iJ:. Qrácle;· 3500.00 70.13 348.10 2467.59 2395.59 6001927.14 565401.94 1994.79 0.00 0.00 MWD+IFR+MS 3600.00 70.13 348.10 2501.59 2429.59 6002018.98 565381.73 2088.82 0.00 0.00 MWD+IFR+MS 3700.00 70.13 348.10 2535.59 2463.59 6002110.82 565361.53 2182.86 0.00 0.00 MWD+IFR+MS 3800.00 70.13 348.10 2569.58 2497.58 6002202.66 565341.32 2276.90 0.00 0.00 MWD+IFR+MS 3900.00 70.13 348.10 2603.58 2531.58 6002294.50 565321.12 2370.93 0.00 0.00 MWD+IFR+MS 4000.00 70.13 348.10 2637.57 2565.57 6002386.33 565300.91 2464.97 0.00 0.00 MWD+IFR+MS 4100.00 70.13 348.10 2671.57 2599.57 6002478.17 565280.71 2559.00 0.00 0.00 MWD+IFR+MS 4200.00 70.13 348.10 2705.57 2633.57 6002570.01 565260.51 2653.04 0.00 0.00 MWD+IFR+MS 4300.00 70.13 348.10 2739.56 2667.56 6002661.85 565240.30 2747.08 0.00 0.00 MWD+IFR+MS 4400.00 70.13 348.10 2773.56 2701.56 6002753.69 565220.10 2841.11 0.00 0.00 MWD+IFR+MS 4500.00 70.13 348.10 2807.56 2735.56 6002845.53 565199.89 2935.15 0.00 0.00 MWD+IFR+MS 4600.00 70.13 348.10 2841.55 2769.55 6002937.37 565179.69 3029.19 0.00 0.00 MWD+IFR+MS 4700.00 70.13 348.10 2875.55 2803.55 6003029.21 565159.49 3123.22 0.00 0.00 MWD+IFR+MS 4800.00 70.13 348.10 2909.55 2837.55 6003121.04 565139.28 3217.26 0.00 0.00 MWD+IFR+MS 4900.00 70.13 348.10 2943.54 2871.54 6003212.88 565119.08 3311.29 0.00 0.00 MWD+IFR+MS 5000.00 70.13 348.10 2977.54 2905.54 6003304.72 565098.87 3405.33 0.00 0.00 MWD+IFR+MS 5100.00 70.13 348.10 3011.53 2939.53 6003396.56 565078.67 3499.37 0.00 0.00 MWD+IFR+MS 5200.00 70.13 348.10 3045.53 2973.53 6003488.40 565058.47 3593.40 0.00 0.00 MWD+IFR+MS 5300.00 70.13 348.10 3079.53 3007.53 6003580.24 565038.26 3687.44 0.00 0.00 MWD+IFR+MS 5400.00 70.13 348.10 3113.52 3041.52 6003672.08 565018.06 3781.48 0.00 0.00 MWD+IFR+MS 5500.00 70.13 348.10 3147.52 3075.52 6003763.92 564997.85 3875.51 0.00 0.00 MWD+IFR+MS 5600.00 70.13 348.10 3181.52 3109.52 6003855.75 564977.65 3969.55 0.00 0.00 MWD+IFR+MS 5700.00 70.13 348.10 3215.51 3143.51 6003947.59 564957.44 4063.58 0.00 0.00 MWD+IFR+MS 5800.00 70.13 348.10 3249.51 3177.51 6004039.43 564937.24 4157.62 0.00 0.00 MWD+IFR+MS 5900.00 70.13 348.10 3283.51 3211.51 6004131.27 564917.04 4251.66 0.00 0.00 MWD+IFR+MS 6000.00 70.13 348.10 3317.50 3245.50 6004223.11 564896.83 4345.69 0.00 0.00 MWD+IFR+MS 6100.00 70.13 348.10 3351.50 3279.50 6004314.95 564876.63 4439.73 0.00 0.00 MWD+IFR+MS 6200.00 70.13 348.10 3385.50 3313.50 6004406.79 564856.42 4533.76 0.00 0.00 MWD+IFR+MS 6300.00 70.13 348.10 3419.49 3347.49 6004498.63 564836.22 4627.80 0.00 0.00 MWD+IFR+MS 6400.00 70.13 348.10 3453.49 3381.49 6004590.46 564816.02 4721.84 0.00 0.00 MWD+IFR+MS 6500.00 70.13 348.10 3487.48 3415.48 6004682.30 564795.81 4815.87 0.00 0.00 MWD+IFR+MS 6600.00 70.13 348.10 3521.48 3449.48 6004774.14 564775.61 4909.91 0.00 0.00 MWD+IFR+MS 6700.00 70.13 348.10 3555.48 3483.48 6004865.98 564755.40 5003.95 0.00 0.00 MWD+IFR+MS 6800.00 70.13 348.10 3589.47 3517.47 6004957.82 564735.20 5097.98 0.00 0.00 MWD+IFR+MS 6900.00 70.13 348.10 3623.47 3551.47 6005049.66 564714.99 5192.02 0.00 0.00 MWD+IFR+MS 7000.00 70.13 348.10 3657.47 3585.47 6005141.50 564694.79 5286.05 0.00 0.00 MWD+IFR+MS 7100.00 70.13 348.10 3691.46 3619.46 6005233.34 564674.59 5380.09 0.00 0.00 MWD+IFR+MS 7200.00 70.13 348.10 3725.46 3653.46 6005325.17 564654.38 5474.13 0.00 0.00 MWD+IFR+MS 7300.00 70.13 348.10 3759.46 3687.46 6005417.01 564634.18 5568.16 0.00 0.00 MWD+IFR+MS 7400.00 70.13 348.10 3793.45 3721.45 6005508.85 564613.97 5662.20 0.00 0.00 MWD+IFR+MS 7500.00 70.13 348.10 3827.45 3755.45 6005600.69 564593.77 5756.24 0.00 0.00 MWD+IFR+MS 7600.00 70.13 348.10 3861.44 3789.44 6005692.53 564573.57 5850.27 0.00 0.00 MWD+IFR+MS 7700.00 70.13 348.10 3895.44 3823.44 6005784.37 564553.36 5944.31 0.00 0.00 MWD+IFR+MS 7800.00 70.13 348.10 3929.44 3857.44 6005876.21 564533.16 6038.34 0.00 0.00 MWD+IFR+MS 7851.88 70.13 348.10 3947.08 3875.08 6005923.86 564522.68 6087.13 0.00 0.00 MWD+IFR+MS 7900.00 68.31 347.41 3964.15 3892.15 6005967.73 564512.75 6132.12 4.00 199.42 MWD+IFR+MS 8000.00 64.55 345.92 4004.13 3932.13 6006056.70 564490.85 6223.75 4.00 199.67 MWD+IFR+MS 8100.00 60.81 344.33 4050.02 3978.02 6006142.34 564467.31 6312.51 4.00 200.26 MWD+IFR+MS 8200.00 57.08 342.63 4101.60 4029.60 6006224.24 564442.26 6397.96 4.00 200.99 MWD+IFR+MS 8245.71 55.39 341.80 4127.00 4055.00 6006260.32 564430.34 6435.81 4.00 201.87 SBF2-NA 8288.86 53.80 340.99 4152.00 4080.00 6006293.54 564418.83 6470.78 4.00 202.33 SBF1-NB 8300.00 53.39 340.77 4158.61 4086.61 6006301.99 564415.82 6479.69 4.00 202.80 MWD+IFR+MS ','.. CF....·. .,.i·~.e. ..m.. .d..'~.·,... ...,.a. :...~)'; ~P,l\rriMq . ... Milnè:F?()iri(, 'Site; . .M:PtSPåd . '.. WtÏl~ ... .': . pl~Ô.MpS;;1:8· . : Wellp~*:> Plâl'tMPS48' ' Survey Jriêf\ .. ..\,iitri.. . :p~g. :. '.. :~~9 51.97 340.01 49.72 338.73 48.26 337.85 8338.58 8400.00 8439.95 8477.02 46.92 337.00 8500.00 46.09 336.46 8520.32 45.36 335.96 8558.29 44.00 335.00 8598.61 44.00 335.00 8600.00 44.00 335.00 8700.00 44.00 335.00 8748.61 44.00 335.00 ) ) ""- l, .~ ) BP KW A Planning Report MAP . . :"." .... ........ ..... . ...... .:. .. ..... ."..... ..... .. .... . ..... :Q~t~:,:n1~/~ptf002.. .. .,. '" .... ,. Til11~~:Q~:49:~?· ..,..... ......:): ...,l'açé: .. >. 4 · ·.<:0. ..~o....r....~.~~. ~te...<N....E..,J.R...... ~(¡...e. r,.,...e.:, ".,."c,., e,.. :,., .. . W~U:PIªriMP$~.1~;J:rue ~()l1h . v i I('l'VD) Rti . .....$. '".p.......a.'. d.D.·..Ø...·'.·..v.':,..,....:~. ;0. .... :....' '.'.......: .....'....:.........:. ".'.. .......:........' . .,.' . '.....'.'.. ..... .... ::.8. ·,.ec.~.rt.ti.:.;.·.:. t.'v.·.···.. S.:) :R. ,J.íï. e.' ·~.'·..e. ··.~.c.ee.";...ce.. :. :: ' \ ...;.;.·.WM'.,·:,·I·e.n··.·.1iI.'m··'··~' °u:·. ;m··.O.". Þ,...·.·.·..c..N,.;.·.·u:.'.t,'.,.·.fO.a;Ot'.:··u,:.Ë.r· :.·.e,·3...4... 7;~7.,....AZ.:·.·.'.··..·Di).·.b·.'.'.,.:'.. . · ",. ·"~ury~)'ÇâlctilåtiØ#M~tbô'd::- .,y :.. Or~çle .' :'.:' , MªÞ~, ,·tt 4182.00 4110.00 6006330.79 564405.27 6510.14 4.00 202.93 SBE4-NC 4220.78 4148.78 6006375.21 564388.11 6557.30 4.00 203.39 MWD+IFR+MS 4247.00 4175.00 6006403.12 564376.72 6587.07 4.00 204.20 SBE1-NF 4272.00 4200.00 6006428.29 564365.99 6614.03 4.00 204.78 TSBD-OA 4287.81 4215.81 6006443.55 564359.27 6630.41 4.00 205.35 MWD+IFR+MS 4302.00 4230.00 6006456.81 564353.29 6644.69 4.00 205.72 TSBC 4329.00 4257.00 6006481.00 564342.00 6670.82 4.00 206.07 Psyduck (OB) 4358.00 4286.00 6006506.27 564329.94 6698.17 0.00 0.00 TSBA5 (base 08) 4359.00 4287.00 6006507.14 564329.52 6699.11 0.00 0.00 MWD+IFR+MS 4430.93 4358.93 6006569.83 564299.62 6766.97 0.00 0.00 MWD+IFR+MS 4465.90 4393.90 6006600.31 564285.08 6799.95 0.00 0.00 MWD+IFR+MS P054965 I DATE 11/18/02 I l,;Ht:.l,;\ NU. P054965 DATE DESCRIPTION VENDOR DISCOUNT NET GROSS INVOICE I CREDIT MEMO 11/18/02 INV# CKll140~ PERMIT TO DRILL FEE YY\t>s - \ß; RECEIVED DEC 11 2002 IJaÜ' OU-& Gas Gons. Commission - . - . Anchorage THE ATIACHED CHECK IS IN PAYMENT FOR ITEMS DESCRIBED ABOVE. TOTAL ~ BP EXPLORATION, (ALASKA) INC. PRUDHOE BAY UNIT PO BOX 196612 ANCHORAGE, AK 99519·6612 No.P 054965 NATIONAL.- CITY BANK Ashland. Ohio 56-389 --¡.j2 CONSOLIDATED COMMERCIAL ACCOUNT PAY AMOUNT TO THE ORDER OF ALASKA OIL ..& GAS CONSERVATION 333 w. 7thAVEi STE. 100 ANCHORAGE, AI< 99501 18 , --200~1:.''''.''''''''''''.'''''''''~*.:.'* t~o.? .?O~*~.~~, ... .. N t~~;~:J!fJflN;±~Z:f:;:;S;::~ . . i\;::f:8{~:~Ù~;~~~~i~;;~;~:;~;~TIG "'-"-~_:- :-~ III 0 5 ~ (U; Sill I: 0 ~ ~ 2 0 ~ a g 5 I: 0 ~ 2 ? a g b III H I "'~-- l TRANSMIT AL LETTER CHECK LIST CIRCLE APPROPRIATE LETTER/PARAGRAPHS TO BE INCLUDED IN TRANSMITTAL LETTER WELL NAME PTD# CHECK WHAT APPLIES ADD-ONS (OPTIONS) MUL TI LATERAL (If API number last two (2) digits are between 60-69) "CLUE" The permit is for a new wellbore segment of existing well Permit No, API No. Production should continue to be reported as a function· of the original API number stated above. HOLE In accordance with 20 AAC 25.005(1), all records, data and logs acquired for the pilot hole must be clearly differentiated in both name (name on permit plus PH) and API number (50 70/80) from records, data and logs acquired for well (name on permit). PILOT (PH) SPACING EXCEPTION DRY DITCH SAMPLE Rev: 07/10/02 C\j ody\templates The permit is approved subject to full compliance with 20 AAC 25.055. Approval to perforate and produce is contingent upon issuance of a conservation order approving a spacing exception. (Company Name) assumes the liability of any protest to the spacing exception that may occur. All dry ditch sample sets submitted to the Commission must be in no greater than 30' sample intervals from below the permafrost or from where samples are first caught and 10' sample intervals through target zones. WELL PERMIT CHECKLIST COMPANY ,AfJ X WELL NAME¡41~G{ Hp,t; - It¡ ¡PROGRAM: Exp _ Dev _ Redrll_ Re-Enter _ Serv ~ Wellbore seg_ FIELD & POOL ç ¿ç It.¡ 0 INIT CLASS / - ¿.. u'" f- J GEOL AREA ¡ 7 ~ UNIT# / ¡ 3 ¿<¡ ON/OFF SHORE ~ ADMINISTRATION 1. Permit fee attached. . . . . . . . . . . . . . . . . . . . . . . ''(' N 2. Lease number appropriate. . . . . . . . . . . . . . . . . . . Y N 3. Unique well name and number. . . . . . . . . . . . . . . . . Y N 4. Well located in a defined pool.. . . . . . . . . . . . . . . . . Y N 5. Well located proper distance from drilling unit boundary. . . . Y N 6. Well located proper distance from other wells.. . . . . . . . . Y N APPR DATE 7. Sufficient acreage available in drilling unit.. . . . . . . . . . . Y N , /, J 8. If deviated, is wellbore plat included.. . . . . . . . . . . . . . Y N ¡f'/f. I~o<.., 9. Operator only affected party.. . . . . . . . . . . . . . . . . . Y N 10. Operator has appropriate bond in force. . . . . . . . . . . . . Y N 11. Permit can be issued without conservation order. . . . . . . . Y N 12. Permit can be issued without administrative approval.. . . . . Y N ~~:~:~: ~::: g~:~~ ~~'. ~I~~~~~~n ~~~I~:r::~~~:~~:~dri:~fi~~.in!e~t~o~ ~r~~r ~~ ~~Y ~N ENGINEERING 15. Conductor string provided. . .. . . . . . . . . . . . . . . . 16. Surface casing protects all known USDWs. . . . . . . . . . . Y. N 17. CMT vol adequate to circulate on conductor & surf csg. . . . . ' N 18. CMT vol adequate to tie-in long string to surf csg. . . . . . . . ~. ~ 19. CMT will cover all known productive horizons. . . . . . . . . . .- N 20. Casing designs adequate for C, T, B & permafrost. . . . . . . N 21. Adequate tankage or reserve pit.. . . . . . . . . . . . . . . . N t:) crt¿:1 i¥- I 4- . 22. If a re-drill, has a 10-403 for abandonment been approved. . . AL/itf- 23. Adequate wellbore separation proposed.. ..... . . . . . . . . N 24. If diverter required, does U meet regulations. .. . . . . . . . N Vlf! 25. Drilling fluid program schematic & equip list adequate. . . . . NN fYlIfV1( ,'t /IJ q ¿ Ppcl . 26. BOPEs, do they meet regulation. . . . . . . . . . . . . . . . I)' APPR DATE 27. BOPE press rating appropriate; test to 3500 psig. ~ N J11,ç P ILl / 7 f).!,;, ,. ¡bÆ '2.-13}a! 2ft Choke manifold complies w/API RP-53 (May 84). . . . . . . . ~ N ~' l~ 29. Work will occur without operation shutdown. . . . . . . . . . . ~ 30. Is presence of H2S gas probable.. . . . . . . . . . . . . . . . Y. ^-....:r { ~ ¡.i-. I ~ L ~/;-, I:' It . C{ H ~ ^ :':\/2 (Service Well Only) 31. Mechanical condition of wells within AOR verif",d. . . . . . . . ~. N u¿ ~~ ~t'~c;,. Il'1..tk&"¡ L II'\. tu... I t\.. ~ Ý ¡ 1<-f IJf "'- LU.t ~ 1I\..~"tU).... rt"" · GEOLOGY 32. Permit can be issued wlo hydrogen sulfide measures. . . . . fié0 N APPR DATE 33. Data presented on potential overpressure zones. . . . . . . . Y , D) 34. Seismic analysis of shallow gas zones. . . . . . . . . . . . . .Y.. N~ IU; A . , ' ,.Ifr't'. )V;¡Þ<.. 35. Seabed condition survey (if off-shore). . . . . .. ...... (Exploratory Only) 36. Contact namelphone for weekly progress reports. ...... GEOLOGY: PETROLEUM ENGINEERING: RESERVOIR ENGINEERING RP~ TEM JDH v' .,/' Zo'2-IQS ?:DZ-I<1(p II? If .2. ~ N/£ 2.9' 4/.; -/ to ~ 202 - '2 ~ ! I'!fJs J erA \ . l \ UIC ENGINEER COMMISSIONER: Comments/Instructions: JBR COT DTS 0 e./O q- I Q) MLB t>;z..Jp .r-/¿J:J Rev: 10/15/02 SFD_ WGA V MJW G:\geology\perm its\checklist.doc ) ) Well History File APPENDIX Information of detailed nature that is not particularly germane to the Well Permitting Process but is part of the history file. To improve the readability of the Well History file and to sim'plify finding infonnation, information of this nature is accumulated at the end of the file under APPENDIX. No special effort has been made to chronologically organize this category of information. Sperry-Sun D~ }ing Services LIS Scan Utility ) ~Od·~·dLþ~ t \136 ~ $Revision: 3 $ LisLib $Revision: 4 $ Thu Jun 12 15:50:54 2003 Reel Header Service name. . . . . . . . . . . . .LISTPE Date.. . . . . . . . . . . . . . . . . . . .03/06/12 Origin. . . . . . . . . . . . . . . . . . . STS Reel Name............... . UNKNOWN Continuation Number.... ..01 Previous Reel Name..... ..UNKNOWN Comments............... ..STS LIS Writing Library. Scientific Technical Services Tape Header Service name............ .LISTPE Date. . . . . . . . . . . . . . . . . . . . .03/06/12 Origin. . . . . . . . . . . . . . . . . . . STS Tape Name............... . UNKNOWN Continuation Number..... .01 Previous Tape Name...... . UNKNOWN Comments................ .STS LIS Writing Library. Scientific Technical Services Physical EOF Comment Record TAPE HEADER Milne Point MWD/MAD LOGS # WELL NAME: API NUMBER: OPERATOR: LOGGING COMPANY: TAPE CREATION DATE: # JOB DATA MPS-18 500292313300 BP Exploration (Alaska) I Inc. Sperry-Sun Drilling Services 12-JUN-03 JOB NUMBER: LOGGING ENGINEER: OPERATOR WITNESS: MWD RUN 1 MW0002289288 B. ZIEMKE C. DIXON MWD RUN 2 MW0002289288 T. MCGUIRE C. DIXON MWD RUN 3 MW0002289288 T. MCGUIRE C. DIXON JOB NUMBER: LOGGING ENGINEER: OPERATOR WITNESS: MWD RUN 4 MW0002289288 T. MCGUIRE C. DIXON # SURFACE LOCATION SECTION: TOWNSHIP: RANGE: FNL: FSL: FEL: FWL: ELEVATION (FT FROM MSL 0) KELLY BUSHING: DERRICK FLOOR: GROUND LEVEL: 12 12N 10E 3312 180 72.56 38.60 # WELL CASING RECORD OPEN HOLE CASING DRILLERS 1ST STRING 2ND STRING 3RD STRING PRODUCTION STRING BIT ~ '} (IN) SIZE (IN) DEPTH (FT) 12.250 20.000 112.0 8.500 9.625 2940.0 ) # REMARKS: 1. ALL DEPTHS ARE MEASURED DEPTH (MD) UNLESS OTHERWISE NOTED. THESE DEPTHS ARE BIT DEPTHS. 2. ALL VERTICAL DEPTHS ARE TRUE VERTICAL DEPTH (TVD). 3. THIS WELL WAS EFFECTED BY MEANS OF AN OPEN-HOLE SIDETRACK IN THE MPS-18 PB1 WELLBORE, AT 4800'MD/2881'TVD. THIS SIDETRACK WAS DRILLED DUE TO STUCK DRILLPIPE IN THE ORIGINAL WELL. 4. MWD RUN 1 COMPRISED DIRECTIONAL WITH DUAL GAMMA RAY (DGR) , UTILIZING GEIGER-MUELLER TUBE DETECTORS. 5. MWD RUNS 2 - 4 COMPRISED DIRECTIONAL WITH DGR¡ ELECTROMAGNETIC WAVE RESISTIVITY PHASE-4 (EWR4) ¡ AND PRESSURE WHILE DRILLING (PWD). ALL RUN 2 DATA ARE REAL TIME AND ONLY SHALLOW AND DEEP RESISTIVITY MEASUREMENTS ARE AVAILABLE. AS A CONSEQUENCE OF THE REAL-TIME-ONLY RUN 2 DATA SET, THERE ARE MANY GAPS IN THE DATA. 6. DEPTH SHIFTING/CORRECTION OF MWD DATA WAS WAIVED PER E-MAIL FROM D. SCHNORR, BP ALASKA, INC. , DATED 6/10/03. MWD DATA ARE CONSIDERED PDC. 7. MWD RUNS 1 - 4 REPRESENT WELL MPS-18 WITH API#: 50-029-23133-00. THIS WELL REACHED A TOTAL DEPTH (TD) OF 8704'MD/4454'TVD. SROP SMOOTHED RATE OF PENETRATION WHILE DRILLING. SGRC SMOOTHED GAMMA RAY COMBINED. SEXP SMOOTHED PHASE SHIFT-DERIVED RESISTIVITY (EXTRA SHALLOW SPACING) . SESP = SMOOTHED PHASE SHIFT-DERIVED RESISTIVITY (SHALLOW SPACING) . SEMP = SMOOTHED PHASE SHIFT-DERIVED RESISTIVITY (MEDIUM SPACING) . SEDP = SMOOTHED PHASE SHIFT-DERIVED RESISTIVITY (DEEP SPACING) . SFXE = SMOOTHED FORMATION EXPOSURE TIME (DEEP RESISTIVITY) . SLIDE = NON-ROTATED INTERVALS, REFLECTING BIT DEPTHS $ File Header Service name............ .STSLIB.001 Service Sub Level Name... Version Number.......... .1.0.0 Date of Generation...... .03/06/12 Maximum Physical Record. .65535 F i 1 e Type........ . . . . . . . . LO Previous File Name...... .STSLIB.OOO Comment Record FILE HEADER FILE NUMBER: EDITED MERGED MWD Depth shifted DEPTH INCREMENT: # FILE SUMMARY PBU TOOL CODE GR ROP FET RPD RPS RPM RPX $ ) 1 ") and clipped curves¡ all bit runs merged. .5000 START DEPTH 42.5 112.5 2935.5 2935.5 2935.5 4705.5 4705.5 STOP DEPTH 8666.5 8703.5 8659.0 8659.0 8659.0 8659.0 8659.0 # BASELINE CURVE FOR SHIFTS: CURVE SHIFT DATA (MEASURED DEPTH) --------- EQUIVALENT UNSHIFTED DEPTH --------- BASELINE DEPTH $ # MERGED DATA SOURCE PBU TOOL CODE MWD MWD MWD MWD $ # REMARKS: BIT RUN NO 1 2 3 4 MERGED MAIN PASS. $ MERGE TOP 42.5 2950.0 4800.0 8630.0 MERGE BASE 2950.0 4800.0 8630.0 8703.5 # Data Format Specification Record Data Record Type..................O Data Specification Block Type.....O Logging Direction. . . . . . . . . . . . . . . . . Down Optical log depth units.......... .Feet Data Reference Point............. . Undefined Frame Spacing............. ....... .60 .1IN Max frames per record............ .Undefined Absent value... . . . . . . . . . . . . . . . . . . . -999 Depth Units. . . . . . . . . . . . . . . . . . . . . . . Datum Specification Block sub-type...O Name Service Order Units Size Nsam Rep Code Offset Channel DEPT FT 4 1 68 0 1 ROP MWD FT/H 4 1 68 4 2 GR MWD API 4 1 68 8 3 RPX MWD OHMM 4 1 68 12 4 RPS MWD OHMM 4 1 68 16 5 RPM MWD OHMM 4 1 68 20 6 RPD MWD OHMM 4 1 68 24 7 FET MWD HOUR 4 1 68 28 8 First Last Name Service Unit Min Max Mean Nsam Reading Reading DEPT FT 42.5 8703.5 4373 17323 42.5 8703.5 ROP MWD FT/H 0.32 3442.57 463.476 17183 112.5 8703.5 GR MWD API 11.02 300.61 71.615 16839 42.5 8666.5 RPX MWD OHMM 1.76 77.84 9.84675 7908 4705.5 8659 RPS MWD OHMM 1.78 80.8 11.1994 9740 2935.5 8659 RPM MWD OHMM 1.86 76.28 10.3775 7908 4705.5 8659 RPD MWD OHMM 2.18 2000 17.7154 9740 2935.5 8659 FET MWD HOUR 0.0192 49.36 1.74087 9740 2935.5 8659 ) ') First Reading For Entire File......... .42.5 Last Reading For Entire File.......... .8703.5 File Trailer Service name............ .STSLIB.001 Service Sub Level Name... Version Number.......... .1.0.0 Date of Generation...... .03/06/12 Maximum Physical Record. .65535 File Type. . . . . . . . . . . . . . . . LO Next File Name.......... .STSLIB.002 Physical EOF File Header Service name............ .STSLIB.002 Service Sub Level Name... Version Number.......... .1.0.0 Date of Generation...... .03/06/12 Maximum Physical Record. .65535 File Type. . . . . . . . . . . . . . . . LO Previous File Name...... .STSLIB.001 Comment Record FILE HEADER FILE NUMBER: RAW MWD Curves and log BIT RUN NUMBER: DEPTH INCREMENT: # FILE SUMMARY VENDOR TOOL CODE GR ROP $ 2 header data for each bit run in separate files. 1 .5000 START DEPTH 42.5 112.5 STOP DEPTH 2878.5 2950.0 # LOG HEADER DATA DATE LOGGED: SOFTWARE SURFACE SOFTWARE VERSION: DOWNHOLE SOFTWARE VERSION: DATA TYPE (MEMORY OR REAL-TIME) : TD DRILLER (FT): TOP LOG INTERVAL (FT): BOTTOM LOG INTERVAL (FT): BIT ROTATING SPEED (RPM): HOLE INCLINATION (DEG MINIMUM ANGLE: MAXIMUM ANGLE: 18-FEB-03 Insite 4.3 Memory 2950.0 112.0 2950.0 .4 72.2 # TOOL STRING (TOP TO BOTTOM) VENDOR TOOL CODE TOOL TYPE GM Dual GR $ TOOL NUMBER 72829 # BOREHOLE AND CASING DATA OPEN HOLE BIT SIZE (IN): DRILLER'S CASING DEPTH (FT): 12.250 112.0 # BOREHOLE CONDITIONS MUD TYPE: MUD DENSITY (LB/G): LSND 9.25 MUD VISCOSITY (S): ) MUD PH: MUD CHLORIDES (PPM): FLUID LOSS (C3): RESISTIVITY (OHMM) AT TEMPERATURE (DEGF) MUD AT MEASURED TEMPERATURE (MT): MUD AT MAX CIRCULATING TERMPERATURE: MUD FILTRATE AT MT: MUD CAKE AT MT: 121.0 8.0 100 8.2 ) .000 .000 .000 .000 .0 84.2 .0 .0 # NEUTRON TOOL MATRIX: MATRIX DENSITY: HOLE CORRECTION (IN): # TOOL STANDOFF (IN): EWR FREQUENCY (HZ): # REMARKS: $ # Data Format Specification Record Data Record Type..................O Data Specification Block Type.....O Logging Direction................ . Down Optical log depth units.......... .Feet Data Reference Point............. . Undefined Frame spacing.................... .60 .1IN Max frames per record... . . . . . . . . . .Undefined Absent value...................... - 999 Depth Units. . . . . . . . . . . . . . . . . . . . . . . Datum Specification Block sub-type...O Name Service Order DEPT ROP MWD010 GR MWD010 Units Size Nsam Rep Code Offset Channel FT 4 1 68 0 1 FT/H 4 1 68 4 2 API 4 1 68 8 3 First Last Name Service unit Min Max Mean Nsam Reading Reading DEPT FT 42.5 2950 1496.25 5816 42.5 2950 ROP MWD010 FT/H 3.66 1042.09 222.313 5676 112.5 2950 GR MWD010 API 11.02 162.49 74.4378 5673 42.5 2878.5 First Reading For Entire File......... .42.5 Last Reading For Entire File.......... .2950 File Trailer Service name............ .STSLIB.002 Service Sub Level Name... Version Number.......... .1.0.0 Date of Generation...... .03/06/12 Maximum Physical Record. .65535 F i 1 e Type...... . . . . . . . . . . LO Next File Name.......... .STSLIB.003 Physical EOF File Header Service name............ .STSLIB.003 Service Sub Level Name... Version Number. ......... .1.0.0 Date of Generation.... .)/06/12 Maximum Physical Record. .65535 File Type. . . . . . . . . . . . . . . . LO Previous File Name...... .STSLIB.002 Comment Record FILE HEADER FILE NUMBER: RAW MWD Curves and log BIT RUN NUMBER: DEPTH INCREMENT: # FILE SUMMARY VENDOR TOOL CODE GR RPD FET RPS ROP $ 3 ) header data for each bit run in separate files. 2 .5000 START DEPTH 2879.0 2900.5 2900.5 2935.5 2950.5 STOP DEPTH 4800.0 4699.5 4699.5 4699.5 4799.5 # LOG HEADER DATA DATE LOGGED: SOFTWARE SURFACE SOFTWARE VERSION: DOWNHOLE SOFTWARE VERSION: DATA TYPE (MEMORY OR REAL-TIME) : TD DRILLER (FT): TOP LOG INTERVAL (FT): BOTTOM LOG INTERVAL (FT): BIT ROTATING SPEED (RPM): HOLE INCLINATION (DEG MINIMUM ANGLE: MAXIMUM ANGLE: # TOOL STRING (TOP TO VENDOR TOOL CODE DGR EWR4 $ BOTTOM) TOOL TYPE DUAL GAMMA RAY ELECTROMAG. RESIS. 4 # BOREHOLE AND CASING DATA OPEN HOLE BIT SIZE (IN): DRILLER'S CASING DEPTH (FT): # BOREHOLE CONDITIONS MUD TYPE: MUD DENSITY (LB/G): MUD VISCOSITY (S): MUD PH: MUD CHLORIDES (PPM): FLUID LOSS (C3): RESISTIVITY (OHMM) AT TEMPERATURE (DEGF) MUD AT MEASURED TEMPERATURE (MT): MUD AT MAX CIRCULATING TERMPERATURE: MUD FILTRATE AT MT: MUD CAKE AT MT: # NEUTRON TOOL MATRIX: MATRIX DENSITY: HOLE CORRECTION (IN): # TOOL STANDOFF (IN): EWR FREQUENCY (HZ): # REMARKS: 20-FEB-03 Insite 66.37 Memory 4800.0 2950.0 4800.0 68.2 73.8 TOOL NUMBER 014179 106927 8.500 2940.0 Water 8.90 34.0 9.5 400 20.0 Based 5.000 3.110 4.000 4.200 67.0 112.0 67.0 67.0 $ ) ) # Data Format Specification Record Data Record Type..................O Data Specification Block Type.....O Logging Direction. . . . . . . . . . . . . . . . . Down Optical log depth units.......... .Feet Data Reference Point............. . Undefined Frame Spacing.................... .60 .1IN Max frames per record............ . Undefined Absent value. . . . . . . . . . . . . . . . . . . . . . -999 Depth Units. . . . . . . . . . . . . . . . . . . . . . . Datum Specification Block sub-type...O Name Service Order Units Size Nsam Rep Code Offset Channel DEPT FT 4 1 68 0 1 ROP MWD020 FT/H 4 1 68 4 2 GR MWD020 API 4 1 68 8 3 RPS MWD020 OHMM 4 1 68 12 4 RPD MWD020 OHMM 4 1 68 16 5 FET MWD020 HOUR 4 1 68 20 6 First Last Name Service Unit Min Max Mean Nsam Reading Reading DEPT FT 2879 4800 3839.5 3843 2879 4800 ROP MWD020 FT/H 38.42 3442.57 1003.76 3699 2950.5 4799.5 GR MWD020 API 12.45 300.61 68.053 3433 2879 4800 RPS MWD020 OHMM 8.1 48.49 15.8294 1832 2935.5 4699.5 RPD MWD020 OHMM 8.05 2000 96.5559 1881 2900.5 4699.5 FET MWD020 HOUR 0.0192 38.522 1.6117 1881 2900.5 4699.5 First Reading For Entire File......... .2879 Last Reading For Entire File.......... .4800 File Trailer Service name............ .STSLIB.003 Service Sub Level Name... Version Number.......... .1.0.0 Date of Generation...... .03/06/12 Maximum Physical Record. .65535 File Type. . . . . . . . . . . . . . . .LO Next File Name.......... .STSLIB.004 Physical EOF File Header Service name........... ..STSLIB.004 Service Sub Level Name... Version Number.......... .1.0.0 Date of Generation...... .03/06/12 Maximum Physical Record. .65535 File Type............... .LO Previous File Name...... .STSLIB.003 Comment Record FILE HEADER FILE NUMBER: RAW MWD Curves and log BIT RUN NUMBER: DEPTH INCREMENT: # 4 header data for each bit run in separate files. 3 .5000 FILE SUMMARY VENDOR TOOL CODE FET RPD RPM RPS RPX ROP GR $ ') ,I START DÉPTH 4705.5 4705.5 4705.5 4705.5 4705.5 4800.0 4800.5 STOP DEPTH 8585.5 8585.5 8585.5 8585.5 8585.5 8630.0 8593.0 # LOG HEADER DATA DATE LOGGED: SOFTWARE SURFACE SOFTWARE VERSION: DOWNHOLE SOFTWARE VERSION: DATA TYPE (MEMORY OR REAL-TIME) : TD DRILLER (FT): TOP LOG INTERVAL (FT): BOTTOM LOG INTERVAL (FT): BIT ROTATING SPEED (RPM): HOLE INCLINATION (DEG MINIMUM ANGLE: MAXIMUM ANGLE: # TOOL STRING (TOP TO VENDOR TOOL CODE DGR EWR4 $ BOTTOM) TOOL TYPE DUAL GAMMA RAY ELECTROMAG. RES IS. 4 # BOREHOLE AND CASING DATA OPEN HOLE BIT SIZE (IN): DRILLER'S CASING DEPTH (FT): # BOREHOLE CONDITIONS MUD TYPE: MUD DENSITY (LB/G): MUD VISCOSITY (S): MUD PH: MUD CHLORIDES (PPM): FLUID LOSS (C3): RESISTIVITY (OHMM) AT TEMPERATURE (DEGF) MUD AT MEASURED TEMPERATURE (MT): MUD AT MAX CIRCULATING TERMPERATURE: MUD FILTRATE AT MT: MUD CAKE AT MT: # NEUTRON TOOL MATRIX: MATRIX DENSITY: HOLE CORRECTION (IN): # TOOL STANDOFF (IN): EWR FREQUENCY (HZ): # REMARKS: $ # Data Format Specification Record Data Record Type..................O Data Specification Block Type.....O Logging Direction................ . Down Optical log depth units.......... .Feet Data Reference Point............. . Undefined Frame Spacing.................... .60 .1IN Max frames per record.......... ...Undefined Absent value. . . . . . . . . . . . . . . . . . . . . . -999 ) 24-FEB-03 Insite 66.37 Memory 8630.0 4800.0 8630.0 41.6 70.6 TOOL NUMBER 155790 136749 8.500 2940.0 Water 9.20 55.0 9.2 200 6.8 Based 5.500 3.900 10.000 2.200 68.0 102.2 68.0 68.0 Depth units. . . . . . . . . . . . ). . . . . . . . ) Datum Specification BloCk sub-type...O Name Service Order Units Size Nsam Rep Code Offset Channel DEPT FT 4 1 68 0 1 ROP MWD030 FT/H 4 1 68 4 2 GR MWD030 API 4 1 68 8 3 RPX MWD030 OHMM 4 1 68 12 4 RPS MWD030 OHMM 4 1 68 16 5 RPM MWD030 OHMM 4 1 68 20 6 RPD MWD030 OHMM 4 1 68 24 7 FET MWD030 HOUR 4 1 68 28 8 First Last Name Service Unit Min Max Mean Nsam Reading Reading DEPT FT 4705.5 8630 6667.75 7850 4705.5 8630 ROP MWD030 FT/H 0.32 2556.89 384.929 7661 4800 8630 GR MWD030 API 19.2 148.72 70.794 7586 4800.5 8593 RPX MWD030 OHMM 3.18 77.84 9.94685 7761 4705.5 8585.5 RPS MWD030 OHMM 3.32 80.8 10.2327 7761 4705.5 8585.5 RPM MWD030 OHMM 2.7 76.28 10.4878 7761 4705.5 8585.5 RPD MWD030 OHMM 2.56 87.37 11.3689 7761 4705.5 8585.5 FET MWD030 HOUR 0.05 49.36 1.86546 7761 4705.5 8585.5 First Reading For Entire File........ ..4705.5 Last Reading For Entire File.......... .8630 File Trailer Service name............ .STSLIB.004 Service Sub Level Name... Version Number.......... .1.0.0 Date of Generation...... .03/06/12 Maximum Physical Record. .65535 F i 1 e Type. . . . . . . . . . . . . . . . LO Next File Name.......... .STSLIB.005 Physical EOF File Header Service name............ .STSLIB.005 Service Sub Level Name... Version Number.......... .1.0.0 Date of Generation...... .03/06/12 Maximum Physical Record. .65535 File Type............... .LO Previous File Name...... .STSLIB.004 Comment Record FILE HEADER FILE NUMBER: RAW MWD Curves and log BIT RUN NUMBER: DEPTH INCREMENT: # FILE SUMMARY VENDOR TOOL CODE RPD RPM RPS RPX FET 5 header data for each bit run in separate files. 4 .5000 START DEPTH 8586.0 8586.0 8586.0 8586.0 8586.0 STOP DEPTH 8659.0 8659.0 8659.0 8659.0 8659.0 GR ROP $ 8593 ) 8630.:> 8666.5 8703.5 # LOG HEADER DATA DATE LOGGED: SOFTWARE SURFACE SOFTWARE VERSION: DOWNHOLE SOFTWARE VERSION: DATA TYPE (MEMORY OR REAL-TIME) : TD DRILLER (FT): TOP LOG INTERVAL (FT): BOTTOM LOG INTERVAL (FT): BIT ROTATING SPEED (RPM): HOLE INCLINATION (DEG MINIMUM ANGLE: MAXIMUM ANGLE: # TOOL STRING (TOP TO VENDOR TOOL CODE DGR EWR4 $ BOTTOM) TOOL TYPE DUAL GAMMA RAY ELECTROMAG. RES IS. 4 # BOREHOLE AND CASING DATA OPEN HOLE BIT SIZE (IN): DRILLER'S CASING DEPTH (FT): # BOREHOLE CONDITIONS MUD TYPE: MUD DENSITY (LB/G): MUD VISCOSITY (S): MUD PH: MUD CHLORIDES (PPM): FLUID LOSS (C3): RESISTIVITY (OHMM) AT TEMPERATURE (DEGF) MUD AT MEASURED TEMPERATURE (MT): MUD AT MAX CIRCULATING TERMPERATURE: MUD FILTRATE AT MT: MUD CAKE AT MT: # NEUTRON TOOL MATRIX: MATRIX DENSITY: HOLE CORRECTION (IN): # TOOL STANDOFF (IN): EWR FREQUENCY (HZ): # REMARKS: $ # Data Format Specification Record Data Record Type..................O Data Specification Block Type... ..0 Logging Direction................ . Down Optical log depth units.. ........ .Feet Data Reference Point............. .Undefined Frame Spacing.................... .60 .1IN Max frames per record............ . Undefined Absent value. . . . . . . . . . . . . . . . . . . . . . - 999 Depth Units. . . . . . . . . . . . . . . . . . . . . . . Datum Specification Block sub-type. ..0 ) 24-FEB-03 Insite 66.37 Memory 8704.0 8630.0 8704.0 41.7 41.8 TOOL NUMBER 155790 136749 8.500 2940.0 Water Based 9.20 51.0 8.3 200 5.2 5.500 4.010 10.000 2.200 68.0 95.7 68.0 68.0 Name Service Order DEPT ROP MWD040 GR MWD040 Units Size Nsam Rep Code Offset Channel FT 4 1 68 0 1 FT/H 4 1 68 4 2 API 4 1 68 8 3 RPX MWD040 OHMM ) 1 68 12 4 ) RPS MWD040 OHMM 4 1 68 16 5 RPM MWD040 OHMM 4 1 68 20 6 RPD MWD040 OHMM 4 1 68 24 7 FET MWD040 HOUR 4 1 68 28 8 First Last Name Service Unit Min Max Mean Nsam Reading Reading DEPT FT 8586 8703.5 8644.75 236 8586 8703.5 ROP MWD040 FT/H 9.6 944.64 273.582 147 8630.5 8703.5 GR MWD040 API 52.62 109.51 88.2331 147 8593.5 8666.5 RPX MWD040 OHMM 1.76 14.1 4.56197 147 8586 8659 RPS MWD040 OHMM 1.78 11.45 4.53973 147 8586 8659 RPM MWD040 OHMM 1.86 9.59 4.55048 147 8586 8659 RPD MWD040 OHMM 2.18 8.49 4.70639 147 8586 8659 FET MWD040 HOUR 0.66 14.28 8.65286 147 8586 8659 First Reading For Entire File......... .8586 Last Reading For Entire File.......... .8703.5 File Trailer Service name............ .STSLIB.005 Service Sub Level Name... Version Number.......... .1.0.0 Date of Generation...... .03/06/12 Maximum Physical Record. .65535 File Type. . . . . . . . . . . . . . . . LO Next File Name.......... .STSLIB.006 Physical EOF Tape Trailer Service name............ .LISTPE Date.................... .03/06/12 Origin. . . . . . . . . . . . . . . . . . . STS Tape Name............... . UNKNOWN Continuation Number..... .01 Next Tape Name.......... . UNKNOWN Comments................ .STS LIS Writing Library. Scientific Technical Services Reel Trailer Service name.. . . . . . . . . . . .LISTPE Date.................... .03/06/12 Origin. . . . . . . . . . . . . . . . . . . STS Reel Name............... . UNKNOWN Continuation Number..... .01 Next Reel Name.......... . UNKNOWN Comments................ .STS LIS Writing Library. Scientific Technical Services Physical EOF Physical EOF End Of LIS File Sperry-Sun Dr )ing Services LIS Scan Utility $Revision: 3 $ LisLib $Revision: 4 $ Thu Jun 12 14:23:15 2003 ~ --~q:~ 0, , 113~ I Reel Header Service name............ .LISTPE Date. . . . . . . . . . . . . . . . . . . . .03/06/12 Origin. . . . . . . . . . . . . . . . . . . STS Reel Name............... . UNKNOWN Continuation Number..... .01 Previous Reel Name...... . UNKNOWN Comments................ .STS LIS Writing Library. Scientific Technical Services Tape Header Service name............ .LISTPE Date.................... .03/06/12 Origin. . . . . . . . . . . . . . . . . . . STS Tape Name............... . UNKNOWN Continuation Number..... .01 Previous Tape Name...... . UNKNOWN Comments................ .STS LIS Writing Library. Scientific Technical Services Physical EOF Comment Record TAPE HEADER Milne Point MWD/MAD LOGS # WELL NAME: API NUMBER: OPERATOR: LOGGING COMPANY: TAPE CREATION DATE: # JOB DATA MPS-18PB1 500292313370 BP Exploration (Alaska) I Inc. Sperry-Sun Drilling Services 12-JUN-03 JOB NUMBER: LOGGING ENGINEER: OPERATOR WITNESS: MWD RUN 1 MW0002289288 B. ZIEMKE C. DIXON MWD RUN 2 MW0002289288 T. MCGUIRE C. DIXON # SURFACE LOCATION SECTION: TOWNSHIP: RANGE: FNL: FSL: FEL: FWL: ELEVATION (FT FROM KELLY BUSHING: DERRICK FLOOR: GROUND LEVEL: 12 12N 10E 3312 180 MSL 0) 72.56 38.60 # WELL CASING RECORD 1ST STRING 2ND STRING 3RD STRING PRODUCTION STRING OPEN HOLE CASING DRILLERS BIT SIZE (IN) SIZE (IN) DEPTH (FT) 12.250 20.000 112.0 8.500 9.625 2940.0 # REMARKS: 1. ALL DEPTHS ìE MEASURED DEPTH (MD) UNLESS v.JERWISE NOTED. THESE DEPTHS ARE BIT DEPTHS. 2. ALL VERTICAL DEPTHS ARE TRUE VERTICAL DEPTH (TVD). 3. THIS WELL WAS TD'D PREMATURELY DUE TO STUCK DRILL PIPE - THE BHA WAS LEFT IN THE HOLE. ALL RUN 2 DATA ARE REAL TIME AND ONLY SHALLOW AND DEEP RESISTIVITY MEASUREMENTS ARE AVAILABLE. AS A CONSEQUENCE OF THE REAL-TIME-ONLY RUN 2 DATA SET, THERE ARE MANY GAPS IN THE DATA. 4. MWD RUN 1 COMPRISED DIRECTIONAL WITH DUAL GAMMA RAY (DGR) , UTILIZING GEIGER-MUELLER TUBE DETECTORS. 5. MWD RUN 2 COMPRISED DIRECTIONAL WITH DGR¡ ELECTROMAGNETIC WAVE RESISTIVITY PHASE-4 (EWR4) ¡ AND PRESSURE WHILE DRILLING (PWD). 6. DEPTH SHIFTING/CORRECTION OF MWD DATA WAS WAIVED PER E-MAIL FROM D. SCHNORR, BP ALASKA, INC., DATED 6/10/03. MWD DATA ARE CONSIDERED PDC. 7. MWD RUNS 1 AND 2 REPRESENT WELL MPS-18 PB1 WITH API#: 50-029-23133-70. THIS WELL REACHED A TOTAL DEPTH (TD) OF 5884'MD/3258ITVD. SROP SMOOTHED RATE OF PENETRATION WHILE DRILLING. SGRC SMOOTHED GAMMA RAY COMBINED. SEXP SMOOTHED PHASE SHIFT-DERIVED RESISTIVITY (EXTRA SHALLOW SPACING) . SESP = SMOOTHED PHASE SHIFT-DERIVED RESISTIVITY (SHALLOW SPACING) . SEMP = SMOOTHED PHASE SHIFT-DERIVED RESISTIVITY (MEDIUM SPACING) . SEDP = SMOOTHED PHASE SHIFT-DERIVED RESISTIVITY (DEEP SPACING) . SFXE = SMOOTHED FORMATION EXPOSURE TIME (DEEP RESISTIVITY) . SLIDE = NON-ROTATED INTERVALS, REFLECTING BIT DEPTHS $ File Header Service name............ .STSLIB.001 Service Sub Level Name... Version Number. ......... .1.0.0 Date of Generation...... .03/06/12 Maximum Physical Record. .65535 File Type............... .LO Previous File Name...... .STSLIB.OOO Comment Record FILE HEADER FILE NUMBER: 1 EDITED MERGED MWD Depth shifted and clipped curves¡ all bit runs merged. DEPTH INCREMENT: .5000 # FILE SUMMARY PBU TOOL CODE GR ROP RPS RPD FET $ START 42.5 112.5 2900.5 2900.5 2900.5 )TH STOP DEPTH 5853.5 5884.0 5844.0 5844.0 5844.0 ) # BASELINE CURVE FOR SHIFTS: CURVE SHIFT DATA (MEASURED DEPTH) --------- EQUIVALENT UNSHIFTED DEPTH --------- BASELINE DEPTH $ # MERGED DATA SOURCE PBU TOOL CODE MWD MWD $ # REMARKS: BIT RUN NO 1 2 MERGE TOP 42.5 2950.0 MERGE BASE 2950.0 5884.0 MERGED MAIN PASS. $ # Data Format Specification Record Data Record Type..................O Data Specification Block Type.....O Logging Direction................ . Down Optical log depth units.......... .Feet Data Reference Point............. . Undefined Frame Spacing.................... .60 .1IN Max frames per record............ . Undefined Absent value. . . . . . . . . . . . . . . . . . . . . . -999 Depth Units. . . . . . . . . . . . . . . . . . . . . . . Datum Specification Block sub-type...O Name Service Order Units Size Nsam Rep Code Offset Channel DEPT FT 4 1 68 0 1 ROP MWD FT/H 4 1 68 4 2 GR MWD API 4 1 68 8 3 RPS MWD OHMM 4 1 68 12 4 RPD MWD OHMM 4 1 68 16 5 FET MWD HOUR 4 1 68 20 6 First Last Name Service Unit Min Max Mean Nsam Reading Reading DEPT FT 42.5 5884 2963.25 11684 42.5 5884 ROP MWD FT/H 3.66 3442.57 594.385 11544 112.5 5884 GR MWD API 11.02 300.61 73.1126 10895 42.5 5853.5 RPS MWD OHMM 1.33 48.49 13.5141 3119 2900.5 5844 RPD MWD OHMM 4.46 2000 62.531 3119 2900.5 5844 FET MWD HOUR 0.0192 38.522 1.02809 3119 2900.5 5844 First Reading For Entire File......... .42.5 Last Reading For Entire File.......... .5884 File Trailer Service name............ .STSLIB.001 Service Sub Level Name... Version Number.......... .1.0.0 Date of Generation...... .03/06/12 Maximum Physical Record. .65535 File Type........... . . . . .LO Next File Name.......... .STSLIB.002 ) Physical EOF File Header Service name............ .STSLIB.002 service Sub Level Name... Version Number......... ..1.0.0 Date of Generation..... ..03/06/12 Maximum Physical Record. .65535 File Type. . . . . . . . . . . . . . . . LO Previous File Name...... .STSLIB.001 Comment Record FILE HEADER FILE NUMBER: RAW MWD Curves and log BIT RUN NUMBER: DEPTH INCREMENT: # FILE SUMMARY VENDOR TOOL CODE GR ROP $ 2 ) header data for each bit run in separate files. 1 .5000 START DEPTH 42.5 112.5 STOP DEPTH 2878.5 2950.0 # LOG HEADER DATA DATE LOGGED: SOFTWARE SURFACE SOFTWARE VERSION: DOWNHOLE SOFTWARE VERSION: DATA TYPE (MEMORY OR REAL-TIME) : TD DRILLER (FT): TOP LOG INTERVAL (FT): BOTTOM LOG INTERVAL (FT): BIT ROTATING SPEED (RPM): HOLE INCLINATION (DEG MINIMUM ANGLE: MAXIMUM ANGLE: # TOOL STRING (TOP TO BOTTOM) VENDOR TOOL CODE TOOL TYPE 8M Dual GR $ # BOREHOLE AND CASING DATA OPEN HOLE BIT SIZE (IN): DRILLER'S CASING DEPTH (FT): # BOREHOLE CONDITIONS MUD TYPE: MUD DENSITY (LB/G): MUD VISCOSITY (S): MUD PH: MUD CHLORIDES (PPM): FLUID LOSS (C3): RESISTIVITY (OHMM) AT TEMPERATURE (DEGF) MUD AT MEASURED TEMPERATURE (MT): MUD AT MAX CIRCULATING TERMPERATURE: MUD FILTRATE AT MT: MUD CAKE AT MT: # NEUTRON TOOL MATRIX: MATRIX DENSITY: HOLE CORRECTION (IN): # 18-FEB-03 Insite 4.3 Memory 2950.0 112.0 2950.0 .4 72.2 TOOL NUMBER 72829 12.250 112.0 LSND 9.25 121.0 8.0 100 8.2 .000 .000 .000 .000 .0 84.2 .0 .0 TOOL STANDOFF (IN): EWR FREQUENCY (HZ): ) ) # REMARKS: $ # Data Format Specification Record Data Record Type................ ..0 Data Specification Block Type... ..0 Logging Direction......... ...... ..Down Optical log depth units......... ..Feet Data Reference Point............. . Undefined Frame Spacing.................... .60 .1IN Max frames per record............ . Undefined Absent value...................... -999 Depth Units. . . . . . . . . . . . . . . . . . . . . . . Datum Specification Block sub-type...O Name Service Order DEPT ROP MWD010 GR MWD010 Units Size Nsam Rep Code Offset Channel FT 4 1 68 0 1 FT/H 4 1 68 4 2 API 4 1 68 8 3 First Last Name Service Unit Min Max Mean Nsam Reading Reading DEPT FT 42.5 2950 1496.25 5816 42.5 2950 ROP MWD010 FT/H 3.66 1042.09 222.313 5676 112.5 2950 GR MWD010 API 11.02 162.49 74.4378 5673 42.5 2878.5 First Reading For Entire File......... .42.5 Last Reading For Entire File......... ..2950 File Trailer Service name............ .STSLIB.002 Service Sub Level Name... Version Number.......... .1.0.0 Date of Generation...... .03/06/12 Maximum Physical Record. .65535 File Type. . . . . . . . . . . . . . . . LO Next File Name.......... .STSLIB.003 Physical EOF File Header Service name............ .STSLIB.003 Service Sub Level Name... Version Number.......... .1.0.0 Date of Generation...... .03/06/12 Maximum Physical Record. .65535 File Type. . . . . . . . . . . . . . . .LO Previous File Name...... .STSLIB.002 Comment Record FILE HEADER FILE NUMBER: RAW MWD Curves and log BIT RUN NUMBER: DEPTH INCREMENT: # FILE SUMMARY VENDOR TOOL CODE 3 header data for each bit run in separate files. 2 .5000 START DEPTH STOP DEPTH GR 2879. ) 5853.5 ) RPS 2900.5 5844.0 RPD 2900.5 5844.0 FET 2900.5 5844.0 ROP 2950.5 5884.0 $ # LOG HEADER DATA DATE LOGGED: SOFTWARE SURFACE SOFTWARE VERSION: DOWNHOLE SOFTWARE VERSION: DATA TYPE (MEMORY OR REAL-TIME) : TD DRILLER (FT): TOP LOG INTERVAL (FT): BOTTOM LOG INTERVAL (FT): BIT ROTATING SPEED (RPM): HOLE INCLINATION (DEG MINIMUM ANGLE: MAXIMUM ANGLE: # TOOL STRING (TOP TO VENDOR TOOL CODE DGR EWR4 $ BOTTOM) TOOL TYPE DUAL GAMMA RAY ELECTROMAG. RES IS. 4 # BOREHOLE AND CASING DATA OPEN HOLE BIT SIZE (IN): DRILLER'S CASING DEPTH (FT): # BOREHOLE CONDITIONS MUD TYPE: MUD DENSITY (LB/G): MUD VISCOSITY (S): MUD PH: MUD CHLORIDES (PPM): FLUID LOSS (C3): RESISTIVITY (OHMM) AT TEMPERATURE (DEGF) MUD AT MEASURED TEMPERATURE (MT): MUD AT MAX CIRCULATING TERMPERATURE: MUD FILTRATE AT MT: MUD CAKE AT MT: # NEUTRON TOOL MATRIX: MATRIX DENSITY: HOLE CORRECTION (IN): # TOOL STANDOFF (IN): EWR FREQUENCY (HZ): # REMARKS: $ # Data Format Specification Record Data Record Type..................O Data Specification Block Type.....O Logging Direction................ . Down Optical log depth units.......... .Feet Data Reference Point............ ..Undefined Frame Spacing.. .................. .60 .1IN Max frames per record............ . Undefined Absent value. . . . . . . . . . . . . . . . . . . . . . -999 Depth Units. . . . . . . . . . . . . . . . . . . . . . . Datum Specification Block sub-type...O 19-FEB-03 Insite 66.37 Memory 5884.0 2950.0 5884.0 .0 .0 TOOL NUMBER 014179 106927 8.500 2940.0 Water Based 8.90 34.0 9.5 400 20.0 5.000 .000 4.000 4.200 67.0 .0 67.0 67.0 Name Service Order Units Size Nsam Rep Code Offset Channel DEPT FT ) 1 68 0 1 ') ROP MWD020 FT/H 4 1 68 4 2 GR MWD020 API 4 1 68 8 3 RPS MWD020 OHMM 4 1 68 12 4 RPD MWD020 OHMM 4 1 68 16 5 FET MWD020 HOUR 4 1 68 20 6 First Last Name Service Unit Min Max Mean Nsam Reading Reading DEPT FT 2879 5884 4381.5 6011 2879 5884 ROP MWD020 FT/H 38.42 3442.57 954.282 5868 2950.5 5884 GR MWD020 API 12.45 300.61 71.6729 5222 2879 5853.5 RPS MWD020 OHMM 1.33 48.49 13.5141 3119 2900.5 5844 RPD MWD020 OHMM 4.46 2000 62.531 3119 2900.5 5844 FET MWD020 HOUR 0.0192 38.522 1.02809 3119 2900.5 5844 First Reading For Entire File......... .2879 Last Reading For Entire File.......... .5884 File Trailer Service name............ .STSLIB.003 Service Sub Level Name... Version Number......... ..1.0.0 Date of Generation...... .03/06/12 Maximum Physical Record. .65535 F i 1 e Type. . . . . . . . . . . . . . . . LO Next File Name.......... .STSLIB.004 Physical EOF Tape Trailer Service name............ .LISTPE Da t e. . . . . . . . . . . . . . . . . . . . . 03 / 06/ 12 Origin. . . . . . . . . . . . . . . . . . . STS Tape Name............... .UNKNOWN Continuation Number..... .01 Next Tape Name.......... .UNKNOWN Comments................ .STS LIS Writing Library. Scientific Technical Services Reel Trailer Service name. . . . . . . . . . . . .LISTPE Da t e. . . . . . . . . . . . . . . . . . . . . 03 / 06/12 Origin. . . . . . . . . . . . . . . . . . . STS Reel Name............... . UNKNOWN Continuation Number.... ..01 Next Reel Name.......... . UNKNOWN Comments................ .STS LIS Writing Library. Scientific Technical Services Physical EOF Physical EOF End Of LIS File