Department of Commerce, Community, and Economic Development
Alaska Oil and Gas Conservation Commission
Loading...
HomeMy WebLinkAbout203-033New Plugback Esets
7/26/2024
Well Name API Number PTD
Number
ESet
Number
Date
CD2-09 PB1 50-103-20496-70-00 204-129 T39280 2-22-2006
CD2-10 PB1 50-103-20473-70-00 203-195 T39281 2-22-2006
CD2-28 PB1 50-103-20435-70-00 202-217 T39282 2-22-2006
CD2-40 PB1 50-103-20464-70-00 203-126 T39283 2-22-2006
CD2-43 PB1 50-103-20474-70-00 203-197 T39284 10-29-2004
Kasilof South 1 PB1 50-133-20520-70-00 202-256 T39285 5-16-2006
E-20AL1 PB1 50-029-22561-70-00 204-055 T39286 2-22-2006
F-57A PB1 50-029-22747-70-00 203-167 T39287 2-22-2006
G-18 PB1 50-029-23194-70-00 204-020 T39288 2-22-2006
H-16 PB2 50-029-23227-71-00 204-190 T39289 1-27-2005
I-17L1 PB1 50-029-23212-70-00 204-099 T39290 2-22-2006
S-01 PB1 50-029-23141-70-00 203-034 T39291 2-22-2006
S-08 PB1 50-029-23168-70-00 203-123 T39292 8-29-2003
S-18 PB1 50-029-23133-70-00 202-242 T39293 2-22-2006
06-23B PB1 50-029-20808-70-00 204-087 T39294 2-22-2006
07-14B PB1 50-029-20339-70-00 203-142 T39295 2-22-2006
15-38A PB1 50-029-22496-70-00 203-016 T39296 2-22-2006
C-16A PB1 50-029-20438-70-00 203-084 T39297 2-22-2006
D-28B PB1 50-029-21556-70-00 209-089 T39298 8-20-2012
E-01A PB1 50-029-20166-70-00 203-033 T39299 2-22-2006
K-03B PB1 50-029-21011-72-00 204-115 T39300 2-22-2006
NK-62A PB1 50-029-22852-70-00 203-047 T39301 2-22-2006
S-102L1 PB1 50-029-22972-70-00 203-156 T39302 10-26-2005
W-09A PB1 50-029-21947-70-00 204-102 T39303 2-22-2006
E-01A PB1 50-029-20166-70-00 203-033 T39299 2-22-2006
)
)
Image Project Well History File Cover Page
XHVZE
This page identifies those items that were not scanned during the initial production scanning phase.
They are available in the original file, may be scanned during a special rescan activity or are viewable
by direct inspection of the file.
~03- ()33well History File Identifier
Organizing (done)
o Two-sided 11111111I1111111111
o Rescan Needed
,
~
RESCAN
DIGITAL DATA
~skettes. No. c1.
o Other, No/Type:
OVERSIZED (Scannable)
o Maps:
o Other Items Scannable by
a Large Scanner
D Color Items:
o Greyscale Items:
D Poor Quality Originals:
OVERSIZED (Non-Scannable)
o Other:
o Logs of various kinds:
BY:
Helen ~
o Other:: ,
<. 1/1 A ~
DateS I c¡r éJS- Isl r t' ~
NOTES:
Project Proofing
BY: Hele~:~';~;aria )
Scanning Preparation
BY: Helen~_
;1 x 30 = ft; 0
Date,S- I c¿r OS- 151 I11-..J
+ a. 0 = TOTA,_ PAGES Ç?O
(Count ~ not 'lclude cover sheet) ì/)!1.D
Dateð t <¡( 0 S 151 r Y 1"
Production Scanning
I
Stage 1
Page Count from Scanned File: <6' J (Count does include cover sheet)
Page Count Matches Number in Scanning Preparation: ~ YES NO
HelenéMaria ) Date: 5' ì ~ 0.5"/51 vvt J
-
BY:
Stage 1
If NO in stage 1, page(s) discrepancies were found:
YES NO
Date: 151
I III r
II
Date: 151
Quality Checked 1111111111111111111
BY:
Helen Maria
Scanning is complete at this point unless rescanning is required.
ReScanned
BY:
Helen Maria
Comments about this file:
4P'`'` A , s THE STATE Alaska i Gas
OF
of 1 L Conservation Commission
GOVERNOR SEAN PARNELL
333 West Seventh Avenue
Anchorage, Alaska 99501 -3572
ALAS c� qq Main: 907.279.1433
NED APR 2 2 2Q13
John McMullen G Fax: 907.276.7542
SCAN
Engineering Team Leader 0
BP Exploration (Alaska), Inc. p�
P.O. Box 196612
Anchorage, AK 99519 -6612
Re: Prudhoe Bay Field, Prudhoe Bay Oil Pool, PBU E -01A
Sundry Number: 313 -182
Dear Mr. McMullen:
Enclosed is the approved Application for Sundry Approval relating to the above referenced well.
Please note the conditions of approval set out in the enclosed form.
As provided in AS 31.05.080, within 20 days after written notice of this decision, or such further
time as the Commission grants for good cause shown, a person affected by it may file with the
Commission an application for reconsideration. A request for reconsideration is considered
timely if it is received by 4:30 PM on the 23rd day following the date of this letter, or the next
working day if the 23rd day falls on a holiday or weekend.
Sincerely,
; i i / 7) /&L
Cathy P Foerster
Chair
DATED this ( 7 day of April, 2013.
Encl.
• STATE OF ALASKA 0 _ ,s_. .
ALASKA OIL AND GAS CONSERVATION COMMISSION
APPLICATION FOR SUNDRY APPROVAL OT 41-1 t7//3 20 AAC 25.280
1. Type of Request:
❑ Abandon ' ® Plug for Redrill ❑ Perforate New Pool ❑ Repair Well ❑ Change Approved Program
❑ Suspend ❑ Plug Perforations ❑ Perforate ❑ Pull Tubing ❑ Time Extension
❑ Operations Shutdown ❑ Re -Enter Suspended Well ❑ Stimulate ❑ Alter Casing ❑ Other
2. Operator Name 4. Current Well Class 5. Permit To Drill Number
BP Exploration (Alaska) Inc. ❑ Exploratory ❑ Stratigraphic 203 - 033 •
3. Address: ® Development ❑ Service 6. API Numbe
P.O. Box 196612, Anchorage, Alaska 99519 -6612 - 50.029 20166 - 01 - 00 '
7. If perforating: 8. Well Name and Number:
What Regulation or Conservation Order governs well spacing in this pool?
PBU E -01A .
Will planned perforations require a Spacing Exception? ❑ Yes No
9. Property Designatior 10. Field / Pool(s):
ADL 028299 & 028304 Prudhoe Bay Field / Prudhoe Bay Pool
11. PRESENT WELL CONDITION SUMMARY
Total Depth MD (ft): Total Depth TVD (ft): Effective Depth MD (ft): Effective Depth TVD (ft): Plugs (measured): Junk (measured):
10737' • 9043' ' 10702' 9044' 8944', 10525' None
Casing Length Size MD TVD Burst Collapse
Structural
Conductor 104' 20" 104' 104' 1530 520
Surface 2698' 13 -3/8" 2698' 2698' 4930 2670
Intermediate 8771' 9 -5/8" x 11 -3/4" 8771' 8287' 6870 4760
Production
Liner 1037' 7" 8218' - 9255' 7786' - 8727' 8160 7020
Liner 1793' 3- 1/2 "x3- 3/16 "x2 -7/8" 8944' - 10737' 8443' - 9043'
Perforation Depth MD (ft): Perforation Depth TVD (ft): Tubing Size: Tubing Grade: Tubing MD (ft):
10000' - 10690' 9050' - 9045' 7 ", 26# x 4 - 1/2 ", 12.6# N - 80 / L - 80 8256' / 8998' - 9008'
Packers and SSSV Type: 7" x 4 -1/2" WD Packer Packers and SSSV 8998' / 8492'
MD (ft) and TVD (ft):
12. Attachments: 13. Well Class after proposed work:
® Description Summary of Proposal IN BOP Sketch
❑ Detailed Operations Program ❑ Exploratory El Stratigraphic ® Development ❑ Service
14. Estimated Date for 15. Well Status after proposed work:
Commencing Operation: April 15, 2013 ❑ OiI ❑ WINJ ❑ WDSPL ❑ Plugged
16. Verbal Approval: Date ❑ Gas ❑ GINJ ❑ GSTOR ❑ Abandoned
Commission Representative: ❑ WAG ❑ SPLUG ® Suspended •
17. I hereby certify that the fore• oing is true and correct to the best of my knowledge. Contact: David Johnston, 564 -5985
Printed Name: Joh / ' 5 Title: Engineering Team Leader mail: avid.Johnston2@bp.com
,41. ,O
/
Signature: Phone: 564 - 4711 Date: � /(( .
Commission Use Only
Conditions of approval: Notify Commission so that a representative may witness Z I y n
2
Sundry Number: J
❑ Plug Integrity °E /BOP Test ❑ Mechanical Integrity Test ❑ Location Clearance
Other: 0 0 P 7 ,. e 5 f f"0 3 5-6L- fp 5 L
A/t rhatc p6 p �'
e t' r� * a - /)pro ✓ r d d7rr a04 C. 25,11ZLL )
RBDMS APR 2 2
Spacing Exception Required? ❑ Yes 11(No Subsequent Form Required: / 0 — ¢a . if
� APPROVED BY COMMISSIONER THE COMMISSION Date: 4 - %
Approved By: / 4t4,,,h/k_____ /3 .,9
Form 10-403 Revised 1 2012 i n u licate
Approved application is valid for 12 months from the date of approv _I n I G I q p 1- 1 1;F 4// /!3 ,f // ,r L :4'\
• •
To: Alaska Oil & Gas Conservation Commission
From: David E. Johnston b p
CTD Engineer
Date: April 10, 2013
Re: E -01A Sundry Approval
Sundry approval is requested to plug the E -01A perforations as part of the drilling and completion of
proposed E -01B coiled tubing sidetrack.
History and current status:
Original E -01 Tubulars are from 1976. Well was TTRD sidetracked to E -01A in 2003. The well came
on with acceptable GOR, but only very slowly increased in GOR until it was SI in early 2010 for
finally reaching MGOR. The well has been cycling with degrading performance since. A CIBP was ,
set isolating the bottom most set of perfs in mid -2011, but minimal effect was seen on overall
production trends. There are no further wellwork options on this well, and is a strong candidate for •
CTD sidetrack.
Proposed plan: Sidetrack E -01A to the E -01B location using Nordic 1 Coiled Tubing Drilling rig on
or around May 1, 2013. The E -01B sidetrack is planned to exit the existing 3.3/16" liner and kick off
in Zone 2 and land in Zone 2. This sidetrack will be completed with a 2 -3/8" L -80 liner and cemented
in place. This Sundry covers plugging the existing E -01 A perforations via the E -01 B primary liner
cement job and a liner top packer (alternate plug placement per 20 AAC 25.112(i)).
The following describes work planned and is submitted as an attachment to Form 10 -403. A schematic
diagram of the proposed sidetrack is attached for reference.
Required Permit?
Pre -Rig Work (scheduled to begin April 15th, 2013) 10-403 PTD
1. S Remove LTTP from 3.0" deployment sleeve at 8,959 SLMD No No
2. C Drift to 9,950' MD for 3- 3/16" Whipstock No No
3. C Load and kill well No No
4. C Set 2 - 3/8" bridge plug at 9,150' MD No No
5. F Test bridge plug to 2,000 psi. No No
6. V Set TWC No No
7. V PT MV, SV, WV - Remove TWC if MIT -T X CIB passed No No
8. 0 Remove wellhouse and level pad No No
COnC ✓r, ! �� i&-ell ,id�C e.5 qr y �Q (,oe yd P� dam
vf 5 , e an d Over ,bety
walk 04 2 rat(' Wel/
ijf %'trie i7 and re Clare. wLei C �� /e�
f� �j
A
• 1
Required Permit?
Rig Work (scheduled to begin May 1st, 2013) 10-403 PTD
1. MIRU and test BOPE 250 psi low and 3,500 psi high. Yes No
2. Set 3- 3/16" monobore packer whipstock at 9,825' MD Yes No
3. Mill 2.80" window at 9,078' and 10' of rathole. No Yes
4. Drill build: 3.25" OH, 255' (25 deg DLS planned). No Yes
5. Drill lateral: 3.25" OH, 1160' (12 deg DLS planned). No Yes
6. Run 2 -3/8" liner leaving TOL at 8,870' MD No Yes
7. Pump primary cement job: 15 bbls, 15.8 ppg, TOC at 8,980' Yes* Yes
8. Perform liner cleanout No Yes
9. Test liner lap to 2400 psi. No Yes
10. If liner lap fails set 7" liner top packer No Yes
11. Freeze protect well to 2500' MD No Yes
12. RDMO No Yes
* Approved alternate plug placement per 20 AAC 25.112(i)
Post -Rig Work:
1. Re- install wellhouse, and flow line.
2. RPM /CCL /Cement bond log
3. Perforate about 30' for staged perforation
4. N2 Lift
David E. Johnston
CTD Engineer
564 -5985
CC: Well File
Joe Lastufka
IRLE= * 6' CIW
• Si NOTES: WELL ANGLE > 70° @ 9682%
WELMEAD = MCEVOY E -01 A CATEGORY II - NO SSSV
AtIUATOR = OTIS
INITIAL KB. ELEV 55.02'
BF. ELEV = 26.22
KOP= 9250
Max Angle = 96" @ 10582*
.._„,
Datum MD = 9403' C)
[ 1973' IH 7" OTIS SSSV LAIWANG NIP, 0 = 5.963"
Datum TVD = 8800' SS
13-3/8" CSG, 72#, L-80, ID = 12,347" — I 2698'
Minimum ID = 2.372" c 9855'
3-3116" TCII BOX x 2- 718" STL PIN
8218" I-HTOP SEAL ASSY & 80T LNR PKR, ID = 4.792" I
T TBG, 26#, /4-80, .0383 bpf, D.= 6,276" --1 8256' I 11
TOP OF 7' LNR H 8260' irsi
m...--A
9-5/B" CSG, 47#, L-80, ID = 8..681" --I 8771'
8844* H LNR TOP TEST PLUG (03/22/13)
8944* H4.625" BKR FLUTED SCOOP HEAD, MD = 4.0"
N-1 I 8951' 1
1 BKR DEPLOY SLV, D = 3.0"
m■m
8870' I-13-1/2" X NP, ID = 2.813"
13-1/2" LNR, 8.81#, L-80, .0087 bpf, ID = 2.992" I— 9031' lc. 1.7:4t 8888* Hr X 4 WD PKR 1 ,
9031' —13-112" X 3-3/16" X0, ID = 2.880"
PERFORATION SLIASVIA RV
REF LOG: IsitCNUCQ./GR ON 04/12/03
ANGLE AT TOP FEW: 89" @ 10000'
Note: Refer to Production DB for historical perf data
SIZE SPF INTERVAL Opn/Sqz SHOT SQZ
2" 4 10000 - 10200 0 04/13/03
2" 4 10350 - 10510 0 04/13/03
2" 4 10570 - 10690 C 04/13/03
E 't I 9100' --I TOP OF CENIENT I
,• •
• •
.* 41
- ••■ `
e ■ •A* Mil.101JT VW4DOW #2 9255' - 9261'
I TOP OF WHFSToCK #3 —1 9250' I 7.
f ,• MLLOUT WNDOW#1 9360 ' - 9366'
■Tiv v v
••••••1
r
7 0■01
V■1**
■• >#( •1
14404
,V t 9851* H3-3/16" X2 X0, ID = 2.440"
r . ' 4 4 4 .4
: 4.■ ■ ■ /
■• 10525' --- 2-7/8" HAL MAP
A.......0J ‘ CIBP (07/14/11)
, ■11...
itc9,1,1 ■ -
PB
7" LNR, 26#, -- 10702' HTD , L-80, .0383 bpf, HD = 6 276"
1 9930' WAVAVAVAVA
' r&
3-3/16" LNR, 6.2#, L-80, .0076 bpf, ID'' 2.805" 1 9851' 1
• ■
44,
2-7/8" LNR, 6.16#, L .0055 bpf, 10 =2.372' H 10737"
DATE REV BY COMENTS DATE REV BY CONTENTS PRUDHOE BAY txtr
04/19176 INITIAL COMPLETION 03/31/13 (V13M SSSV ID CORRECTION WELL E-01A
06/71 RPM 04/11/13 JINUJIvE) ADDED 7" TBG PERIAT N1/4): 2030330
04/13103 JLM/KK FIG SIDETRACK (E-01A) ARM): 50-029-20166-01
09/17/03 CMOTTLP DATUM MD CORRECTION SEC 6, T11N, R14E, 1253' NSL & 502 EWL
07/29/11 PBS/ PJC SET CIBP (07/14/11)
1 03/31/13 JR/ PJC SET LTTP (03/22/13) BP Exploration (Alaska)
TRE£ •
0
V1 .LFEAD = SAFETY NOTES: CATEGORY II - NO SSSV
ACTUATOR = E _p 1 B
NfIAL KB_ REV = 55.02' PROPOSED
BF. REV = 2622'
KOP = 9250'
Max Angle = " Q 1973' H7" OTIS SSSV LANDING NP, ID = 5.963"
Datum MD = O
— Datum TVD= 8800' SS
13 -3/8" CSG, 72#, L -80, D = 12.347" — 2698'
I7" TBG, 26#, N-80, .0383 bpf, ID = 6276" 8266' ii. t 8218' H TOP SEAL ASSY & BOT LNR PKR, D = 4.792"
—
TOP OF 7" LNR I— 8260'
9 -5/8" CSG, 47 #, L -80, D = 8.681" H 8771' ■
Minimum ID = " @ _
H4.625" BKR FLUTED SCOOP HEAD, D = 4.00"
— I ' I 3.70" DEPLOYMENT SLV , D = 3.00"
TOP OF 2 -7/8" LNR H '
' H2-7/8" HES X NP, D = 2.331" I
I2 -7/8" LNR, #, , . bpf, D = " I—I 8910' I 8910' H2 -718" X 2 -3/8" XO, D = _ "
(TOP OF 2 -3/8" LNR H 8910'
— I 8944' H4.625" BKR FLUTED SCOOP HEAD, ID = 4.0"
I TOP OF CEMENT H 8910'
8951' 4 3 BKR DEPLOY MENTSLV, D = 3.0"
8970' —13 -112" X NP, D = 2.813"
_.1 = I 8998' _J7" X 4 -1/2" WD FKR 1
I3 -1/2" LNR, 8.81 #, L -80, .0087 bpf, D = 2.992" — 9031' '
9031' — - 1/2" X 3 -3/16" XO, D = 2.880" I
u1**'STOCK (XX- XX -XX) H , ; ", /,`P` I
17" LNR, 26#. L -80, .0383 bpf, D = 6.276" —I 9260' 7" MLLOUT WINDOW (E -01A) 9255' - 9261'
IVVI STOCK (XX- XX -XX) I 9826' 3 -3/16" MLLOUT WINDOW (E -01B) ' - '
I3 -3/16" LNR, 6.2#, L -80, .0076 bpf, D = 2.805" H 9825' _ _
PERFORATION SUMMARY
REF LOG: ON XX/XX/XX
ANGLE AT TOP FEW: " is
Note: Refer to Production DB for historical perf data
SIZE SPF INTERVAL Opn /Sqz DATE
I11
I2 -3/8" LNR — #, _ bpf, D = __ " — l't ,., T1'
DATE REV BY COMM NTS DATE REV BY COMMENTS PRUDHOE BAY UNIT
04/19/76 ORIGINAL COMPLETION WELL: E 01 B
r 06/77 RWO PST No:
04/13/03 JLM /KK RIG SIDETRACK (E API No: 50- 029 - 20166 -0.
04/01/13 JM) PROPOSAL BULT SEC 6, T11N, R14E, 1253' NSL & 502' E'/VL
04/08/13 DEJ/JMD REVISED PROPOSAL
BP Exploration (Alaska)
NORDIC - CALISTA RIG 1 CHOKE / REEL /CIRCULATION MANIFOLD DIAGRAM
V12
..II. 4■ III 17 V15 V11
I
V14 Ilk
Transducers 7 -------
7 -1116" 6000 psi BOP'S ID v 7.06" 0
' T ' T �` _- tn6 °woo PSi, Rx.as GASS V2 V1 V 16 xo tte typlcar BOP �'�� � �� I I e1 /1 r r aamam ror 2 I m rled tubing dneing �. •"" . -. 6 "wao ps6 K0.46 1 t V17 ' HC R ( IC IK OK c I To Poor Boy Gas Buster (1 u
$i 4 . 1; '1�
t 1, � ►.4
�� V78 V19 !RF.
® zv16 ••w6o Pai. Rxaa
. [ 300 "5000 PSiHCR I
■ ii , 2 �a - a rz' ■ -1/16" 5000 Pei CHECK I
VALVE
Manual Choke _
el•►� .III s ro P° n �
• Z _ I NA ® 7 1116 Cameron FOV Gale I
Valve x 5000 Psi
1`t li— MEOH (Diesel . m - ; r—
FP Line
1/4 Tum Halco
CoFlex Hose 1"11112111d
r i r r MW
SW tOWOG To Production Tree or Cross Over
S . •
lag I
T Pre e transducers CoFlex Hose
N11 l 0 CV12 To Coiled Tubing Bleed Off
Inner Reel Valve
A_ _ate : a.. — 7, ■
F 0/13 — Cement Line In
E Ground Level Tie -in
CV10 > _i CV3 CV2 T Stand Pipe
�+ _ _ = _ - Manual Choke alik
„-- "••••••===,•": • • - —" Pressure Transducers
Motlon // — f i ■
N9 Motion �� CV17 1110 •
— _
a -
Nfi
1
Tiger Tank Mud Pump 2 "
In From
• O _ Baker + MP 1 & MP 2
MEW
® 1► I! Choke
U 0 CW4 to Pits • .- -
Rig Floor t
Mud Pump 61 11 CV16 Reverse Ci
Cir CT while OOH MI . —
CS ^ To Manifold
CV15
1 Jun - 2010
R wvwraw Ci rru l a ti nn li no / C7 w hil es OOH CoFlex Hose
s
• 1 Page 1 of 1
Subject: FW: INTENT PLUG for RE -DRILL WELLS: Corrected
From: Davies, Stephen F (DOA)
Sent: Monday, February 08, 2010 10:52 AM
To: Foerster, Catherine P (DOA); McMains, Stephen E (DOA); Schwartz, Guy L (DOA); Saltmarsh, Arthur C
(DOA); Aubert, Winton G (DOA)
Subject: RE: INTENT PLUG for RE -DRILL WELLS: Corrected
Revised procedure with an additional step per Cathy's comment:
INTENT PLUG for RE -DRILL WELLS
(IPBRD) Type Work Code in RBDMS
1. When a Form 10 -403 is submitted requesting approval to plug a well for redrill, the initial reviewer (Art
/ or Steve D.) will check to make sure that the "Plug for Redrill" box in the upper left corner of the 403
form is checked. If the "Abandon" box is checked, we will cross that erroneous entry out and initial it on
both copies of the Form 10 -403 (AOGCC's and operator's copies).
2. On the Form 10 -403 if "Abandon" is checked in Box 15 (Well Status after proposed work), Art or Steve
D. will cross that erroneous entry out and initial it on both copies of the Form 10 -403 (AOGCC's and
operator's copies). Instead, we will check the "Suspended" box. Guy and Winton will serve as quality
control for steps 1 and 2.
3. When Steve McMains receives the Form 10 -403 with a check in the "Plug for Redrill" box, he will enter
the existing code "IBPRD" into RBDMS. This code automatically generates a comment under the History
tab stating "Intent: Plug for Redrill."
4. When Steve McMains receives any Form 10 -407, he will check the History tab in RBDMS for this
comment. If he sees the "Intent: Plug for Redrill" code, and cannot find any evidence that a subsequent
re -drill has been COMPLETED, he will assign a status of SUSPENDED to the well bore in RBDMS, no
matter what status is listed on the 10 -407. Steve will also change the status on the 10 -407 form to
SUSPENDED, and will date and initial his change. If Steve does not see the "Intent: Plug for Redrill"
comment or code, he will enter the status listed on the Form 10 -407 into RBDMS.
5. When the Form 10 -407 for the redrill is received, Steve M. will change the original well's status from
suspended to abandoned.
6. The first week of every January and July, Steve M. and Steve D. will check the "Well by Type Work
Outstanding" user query in RBDMS to ensure that all of the Plug for Redrill wells have been handled
properly. At this same time, Steve M. and Steve D. will also review the list of suspended wells for
accuracy.
Thanks,
Steve D.
file: //F: \Daily Document Record \Procedures_Instructions \FW INTENT PLUG for RE- DRI... 4/6/2012
STATE OF ALASKA
• ALASKA AND GAS CONSERVATION COMMISSIA
REPORT OF SUNDRY WELL OPERATIONS
1. Operations Abandon ❑ Repair Well ❑ Plug Perforations 0 Stimulate Other ❑
Performed: Alter Casing ❑ Pull Tubing ❑ Perforate New Pool ❑ Waiver❑ Time Extension ❑
Change Approved Program ❑ Operat. Shutdown ❑ Perforate ❑ Re -enter Suspended Well ❑
2. Operator BP Exploration (Alaska), Inc. 4. Well Class Before Work: 5. Permit to Drill Number:
Name: Development 0 Exploratory ❑ — 203 -0330
3. Address: P.O. Box 196612 Stratigraphic❑ Service ❑ 6. API Number:
Anchorage, AK 99519 -6612 a 50- 029 - 20166 -01 -00
8. Property Designation (Lease Number) : 9. Well Name and Number: —
ADLO- 028299 PBU E -01A
10. Field /Pool(s): _
PRUDHOE BAY FIELD / PRUDHOE OIL POOL
11. Present Well Condition Summary:
Total Depth measured 10737 feet Plugs (measured) 10525 feet
true vertical 9043 feet Junk (measured) None feet
Effective Depth measured 10702 feet Packer (measured) 8229 8998 feet
true vertical 9044.32 feet (true vertical) 7796 8492 feet
Casing Length Size MD TVD Burst Collapse
Structural
Conductor 75' 20" 94# H -40 29 - 104 29 - 104 1530 520
Surface 2670' 13- 3/8 "72# N -80 28 - 2698 26 - 2698 4930 2670
Intermediate 8744' 9 -5/8" 47# N -80 27 - 8771 27 - 8287 6870 4760
Production 1032' 7" 29# N -80 8229 - 9261 7796 - 8732 8160 7020
Liner 87' 3 -1/2" 8.81# L -80 8944 - 9031 8443 - 8522
Liner 820' 3- 3/16" 6.2# L -80 9031 - 9851 8522 - 9049
Liner 886' 2 -7/8" 6.16# L -80 9851 - 10737 9049 - 9043 13450 13890
Perforation depth: Measured depth: SEE ATTACHED - _ _
True Vertical depth: _ _ _ _ _
Tubing: (size, grade, measured and true vertical depth) 7" 29# N_80 26 - 8256 26 - 7820
Packers and SSSV (type, measured and true vertical depth) 7" BOT Packer 8229 7796
4 -1/2" Otis WD Packer 8998 ,,„, _; 8492
12. Stimulation or cement squeeze summary: 3 ; i ' l lI 1'
Intervals treated (measured):
Treatment descriptions including volumes used and final pressure:
IVI44i t :i 4 (16 ,' 'Alf t;s. ,: i irnission
'`tii3Ifkfilg
13. Representative Daily Average Production or Injection Data
Oil -Bbl Gas -Mcf Water -Bbl Casing Pressure Tubing pressure
Prior to well operation: 832 47,703 57 1,928
Subsequent to operation: 740 31,498 120 1,011
14. Attachments: 15. Well Class after work:
Copies of Logs and Surveys Run Exploratory❑ Development 0 . Service ❑ Stratigraphic ❑
Daily Report of Well Operations X 16. Well Status after work: Oil „ 0 Gas ❑ WDSPL ❑
GSTOR ❑ WINJ ❑ WAGE] GINJ ❑ SUSP❑ SPLUG ❑
17. I hereby certify that the foregoing is true and correct to the best of my knowledge. Sundry Number or N/A if C.O. Exempt:
NA
Contact Joe Lastufka i".1 46 r, 1 i 2.0
Printed Na = Joe Lastu Title Petrotechnical Data Technologist
Signatu = IIII Y 1 Phone 564 -4091 Date 8/12/2011
Ilir
i 9 • -4
Form 10 -404 Revised 10/2010 RBDMS AUG 121011 Submit Original Only
E-01A
203 -033
PERF ATTACHMENT
Sw Name Operation Date Peri Operation Code Meas Depth Top Meas Depth Base Tvd Depth Top Tvd Depth Base
E -01A 4/13/03 PER 10,000. 10,200. 9,049.66 9,049.74
E-01A 4/13/03 PER 10,350. 10,510. 9,050.95 9,051.52
E-01A 4/13/03 PER 10,570. 10,690. 9,048.21 9,044.71
E -01A 7/14/11 BPS 10,525. 10,690. 9,051.02 9,044.71
AB ABANDONED PER PERF
APF ADD PERF RPF REPERF
BPP BRIDGE PLUG PULLED SL SLOTTED LINER
BPS BRIDGE PLUG SET SPR SAND PLUG REMOVED
FCO FILL CLEAN OUT SPS SAND PLUG SET
FIL FILL SQF SQUEEZE FAILED
MIR MECHANICAL ISOLATED REMOVED SQZ SQUEEZE
•
MIS MECHANICAL ISOLATED STC STRADDLE PACK, CLOSED
MLK MECHANICAL LEAK STO STRADDLE PACK, OPEN
OH OPEN HOLE
i
•
E -01 A
DESCRIPTION OF WORK COMPLETED
NRWO OPERATIONS
EVENT SUMMARY
E
at/RIM ".• P"t *4W41111111110,' V341Sti"
7/13/2011 Continued from WSR 07 -12 -11 Scope; PPROF w/ GHOST.. Continue pooh.. check
'data. Get log data posted on Interact. Decision to set CIBP @ 10525', no guns. MU
2 7/8" Hal CIBP. Problems with pack -off assembly. Rebuild. Re make BOT MHA.
MU Hal 2 7/8" MAP CIBP, RIH. * *job in progress **
7/14/2011; «< Continued from WSR 7-13-11>>>>
CT -8 1 3/4" SCOPE OF WORK: PPROF, Set CIBP.
, RIH and set Hal MAP 2 7/8" CIBP @ 10525', ELM depth. POOH, Well has 150 bbl's
diesel FP, — 3900'. RD MOL to scheduled maintanence.
1 « « <JOB COMPLETE »»
l ,
i .
FLUIDS PUMPED
BBLS
150 DIESEL
35 1% KCL
185 TOTAL
TREE = 6" CM/
W
4 1, ELLHEAD= MCEVOY - SAFETY N.: CATEGORY II - NO SSSV 0 1 A
E ACTUATOR = OTIS
KB. ELEV = 55.02'
BF. ELEV = ..• rs 26.22'
KOP = ..... 9250'
Max Angle = 96 @ 10582' I 1973' H 7" OTIS SSSV LANDING NIP, ID = 4.562" I
Datum MD = 9403' •
Datum TV D = 8800' SS
I 13 -3/8" CSG, 72 #, L -80, ID = 12.347" H 2698'
Minimum ID = 2.372" @ 9855'
3- 3/16" TC11 BOX x 2 -7/8" STL PIN
8229' I-1 TOP SEAL ASSY & BOT LNR PKR, ID = 4.792" I
I TOP OF 7" LNR H 8260'
9 -5/8" CSG, 47 #, L -80, ID = 8.681" 1 - 1 8771' 1_411
8944' I- 14.625" BKR FLUTED SCOOP HEAD, ID = 4.0"
8951' 1_13.75" BKR DEPLOYMENT SLV, ID = 3.0" 1
8970' H3-1/2" X NIP, ID = 2.813" I
13 -1/2" LNR, 8.81 #, L -80, .0087 bpf, ID = 2.992" I — I 9031' I 8998' H7" X 4 -1/2" WD PKR I
9031' I - 13 - 1/2" X 3- 3/16" X0, ID = 2.880" I
PERFORATION SUMMARY
REF LOG: MCNL /CCL /GR ON 04/12/03
ANGLE AT TOP PERF: 89 @ 10000'
Note: Refer to Production DB for historical perf data
SIZE SPF INTERVAL Opn /Sqz DATE
2" 4 10000 - 10200 0 04/13/03
2" 4 10350 - 10510 0 04/13/03
2" 4 10570 - 10690 C 04/13/03
�•� I 9100' 1 TOP OF CEMENT I
*I 11
.41 4 4
*♦ MILLOUT WINDOW #2 9255' - 9261'
1111.
TOP OF WHIPSTOCK #3 H 9250'
- kw* MILLOUT WINDOW #1 9360 ' - 9366'
TOP OF WHIPSTOCK #2 H 9361' We�
1.1
�11Nr1
)1( 44
1
141411 9851' — 13 - 3/16" X 2 -7/8" XO, ID = 2.440" 1
11
)t�1
TOP OF WHIPSTOCK #1 ( 9390' 14 1
7 7., VA T / 10525' — 2 -7/8" HAL MAP
1n 4'4'
` CIBP (07/14/11)
Y
I 7" LNR, 26 #, L -80, .0383 bpf, ID = 6.276" I 9930' 1.1.1. ` 10702 PBTD
Ip 3- 3/16" LNR, 6.2 #, L -80, .0076 bpf, ID = 2.805" H 9851' 1
QI>
2 -7/8" LNR, 6.16 #, L -80, .0055 bpf, ID = 2.372" 1-..i 10737' I
DATE REV BY COMMENTS DATE REV BY COMMENTS PRUDHOE BAY UNIT
04/19/76 ORIGINAL COMPLETION WELL: E 01A
06/77 RWO PERMIT No: '2030330
04/13/03 JLM /KK RIG SIDETRACK (E -01A) API No: 50- 029 - 20166 -01
09/17/03 CMO/TLP DATUM MD CORRECTION SEC 6, T11 N, R14E, 1253' NSL & 502' EWL
07/29/11 PBS/ PJC SET CIBP (07/14/11)
BP Exploration (Alaska)
schiq,mberger RECEIVED
No. 5769
Alaska Data & Consulting Services . 1 L ?, 5 2011 Company: State of Alaska
2525 Gambell Street, Suite 400 Alaska Oil & Gas Cons Comm
Anchorage, AK 99503 - 2838 Attn: Christine Shartzer
ATTN: Stephanie Pacillo Maio ON & Gas Cons. Commission 333 West 7th Ave, Suite 100
Anchorage Anchorage, AK 99501
Well Job # Log Description Date BL Color CD
H -17A BLPO -00119 PPROF W GHOST 10- Jul -11 1 1
T 14 -04A AV1P -00093 LEAK DETECTION LOG _ 9- Jul -11 1 1
,263 - 033 E -01A BLPO -00121 PPROF W GHOST 12- Jul -11 1 / 1 Iti $ {3
• p MPB -50 BCRJ -00096 RST WFL LOG 16- Jul -11 1 _ 1 _
H -14B BD88 -00113 PPROF WI DEFT &GHOST 2- Jun -11 1 1
OWDW -SW AV1P -00091 RST WFL LOG 16- Jul -11 1 1
06 -02A BL65 -00027 LDWG EDIT OF MCNL 4- May -11 1 1
15 -02B BJOH -00016 LDWG EDIT OF RST 1- Apr -11 1 1
P2 -41 BJOH -00020 LDWG EDIT OF RST 11- Apr -11 1 1 _
^1-:2.1 F3C:R,1 00086 LDWG EDIT OF USIT 18- May -11 _ N/A 1
+"f_2r3 BMSA -00005 LDWG EDIT OF USIT 30- Jan -11 N/A 1
06 -08A BCRD -00089 LDWG EDIT OF RST 6- Mar -11 1 1
• -- -- --
PLEASE ACKNOWLEDGE RECEIPT BY SIGNING AND RETURNING ONE COPY EACH TO:
Bp H xploiatinr+ (Alaska) Inc. Alaska Data & Consulting Services
Pntroto(.hnical Data Center 1.10 1 2525 Gambell Street, Suite 400
200 Hencon Blvd 2525
AK 99503 -2838
G
W
• •
._
.~ ..
MICROFILMED
03/01/2008
DO NOT PLACE
ANY NEW MATERIAL
UNDER THIS PAGE
F:~LaserFiche\CvrPgs_Inserts\Microfilm Marker.doc
e
e
WELL LOG TRANSMITTAL
To: State of Alaska
Alaska Oil and Gas Conservation Comm.
Attn.: Howard Okland
333 West 7th Avenue, Suite 100
Anchorage, Alaska 99501
February 23, 2004
13ulO
RE: MWD Formation Evaluation Logs: E-OIA & E-OIA PBl,
AK-MW-2365920
E-OIA+PBl:
Digital Log Images:
50-029-20166-01, 70
!fD3-D33
1 CD Rom
PLEASE ACKNOWLEDGE RECEIPT BY SIGNING AND RETURNING THE ATTACHED
COPIES OF THE TRANSMITTAL LETTER TO THE ATTENTION OF:
Sperry-Sun Drilling Services
Attn: Rob Kalish
6900 Arctic Blvd.
Anchorage, Alaska 99518
BP Exploration (Alaska) Inc.
Petro-technical Data Center, LR2-1
900 E. Benson Blvd.
Anchorage, Alaska 99508
~Date:~
l!r'~
Signedl~(I[r1M'th
Î>M~·~~\
DATA SUBMITTAL COMPLIANCE REPORT
5/10/2005
Permit to Drill 2030330
Well Name/No. PRUDHOE BAY UNIT E-01A
Operator BP EXPLORATION (ALASKA) INC
.~d :< ~1)..~·~3
API No. 50-029-20166-01-00
MD 10737·"'/ TVD 9043 ...... Completion Date 4/13/2003 /'
Completion Status 1-01L
------
REQUIRED INFORMATION
Mud Log No
Samples No
--~
_.--------
DATA INFORMATION
Types Electric or Other Logs Run: SGRC, GR, EWR, MGR, CCL, CNL
Well Log Information:
Log/ Electr
Data Digital Dataset
Type Med/Fnnt Number Name
Rpt Directional Survey
~ 0 t:rrá15 bJ.S VorifiC3tiGn " ~~ )<.dv?
Log Log Run
Scale Media No
1
12
¡ Rpt Directional Survey
lED 0 Directional Survey ~ AJ tUi'vL~l , Vt.C vi
I
!~D C:,.1A-814 LIS- Ve-rifiGatÏ'l:tn 5
I
~/ ..LV Ç2.iœCtional Survey
i·
I Rpt LIS Verification 5
Rpt LIS Verification 12
ED C ~ 12131 1tf3 Verifioation. l-i5:. hI) 1. ^o..i
ED C Pds 12131 Neutron 2
ED C Pds
12131 Casing collar locator
2
i
\eutron
) Casing collar locator
2
Blu
2
Blu
¡
[---~------
Well Cores/Samples Infonnation:
Name
Interval
Start Stop
Sent
Received
Current Status 1-01L
UIC N
Directional Survey No
(data taken from Logs Portion of Master Well Data Maint)
~_.
Interval OHI
Start Stop CH Received Comments
9200 10737 Open 4/29/2003
9164 10713 Open 7/24/2003
9300 10678 Open 4/29/2003 PB1
9300 10678 Open 4/29/2003 PB1
9164 10641 Open 7/24/2003 PB1
9200 10737 Open 4/29/2003
9164 10641 Open 7/24/2003 PB1
9164 10713 Open 7/24/2003
8747 10688 Case 7/23/2003
8747 10688 Case 7/23/2003 Compensated Neutron
Log - Memory
GRlCCUCNL
8747 10688 Case 7/23/2003 Compensated Neutron ~~.-'
Log - Memory
GRlCCUCNL
8747 10688 Case 7/23/2003 Compensated Neutron
Log - Memory
GRlCCUCNL
8747 10688 Case 7/23/2003 Compensated Neutron
Log - Memory
GRlCCUCNL
Sample
Set
Number Comments
DATA SUBMITTAL COMPLIANCE REPORT
5/10/2005
Permit to Drill 2030330
Well Name/No. PRUDHOE BAY UNIT E-01A
Operator BP EXPLORATION (ALASKA) INC
MD 10737
TVD 9043
Completion Date 4/13/2003
Completion Status 1-01L
Current Status 1-01L
ADDITIONAL INFORMATION
Well Cored? ~
Chips Received? ~
Daily History Received?
@
@;N
Formation Tops
Analysis
Received?
~
Comments:
-
Compliance Reviewed By:
Date:
API No. 50-029-20166-01-00
UIC N
---
-,~.I
)
a-tJ3 -D3.3
II ~ IS
WELL LOG TRANSMfITAL
To: State of Alaska
Alaska Oil and Gas Conservation Comm.
Attn.: Howard Oldand
33 3 West 7th Avenue, Suite 100
Anchorage, Alaska
July 18, 2003
RE: MWD FOnTIation Evaluation Logs E-OIA,
AK-MW-2365920
1 LDWG fonnattedDisc with verification listing.
API#: 50-029-20166-01
PLEASE ACKNOWLEDGE RECEIPT BY SIGNING AND RETURNING A COPY OF THE TRANSMITTAL
LETTER TO THE ATTENTION OF:
Sperry-Sun Drilling SetVÏces
Attn: Rob Kalish
6. "900 Â.rctiG nl~.vA=r..··r. !.:".~~.'
R 'fg!\V&6t99518
BP Exploration (Alaska) Inc.
Petro- Technical Data Center LR2-]
900 E. Benson Blvd.
Anchorage, Alaska 99508
J'l¡¡ 2 i\ ...
, tl'~ ~
~,'\. ~/
Signed: "'- ~ "--
" ..
A' .w...illl·l..U (....,., (,,:\.,;H~:;~'.:1:~:~n
t, ~'~C11!:1Mè~ l)~¡~t~
. i~~;jf~~~~J~;
''\
)
ó\D.3-ÞP3
\\8~tt
WELL LOG TRANSMITTAL
To: State of Alaska
Alaska Oil and Gas Conservation Comm.
Attn.: Howard Okland
333 West 7th Avenue, Suite 100
Anchorage, Alaska
July 18, 2003
RE: MWD FOffilation Evaluation Logs E-OIA PBI,
AK-MW-2365920
1 LDWG fOffilatted Disc with verification listing.
API#: 50-029-20166-70
PLEASE ACKNOWLEDGE RECEIPT BY SIGNING AND RETURNING A COPY OF THE TRANSMITTAL
LETTER TO THE ATTENTION OF:
BP Exploration (Alaska) Inc.
Petro- T echnica1 Data Center LR2-1
900 E. Benson Blvd.
Anchorage, Alaska 99508
JUL 24 2003
AJa~~': & Gas Cons. Comm¡S1!tkHl
,AnchOf~e
Signro:t2 &C
Schlumbeflger
NO. 2890
Alaska Data & Consulting Services
3940 Arctic Blvd, Suite 300
Anchorage, AK 99503-5711
ATTN: Beth
Company: State of Alaska
Alaska Oil & Gas Cons Comm
Attn: Lisa Weepie
333 West 7th Ave, Suite 100
Anchorage, AK 99501
Field: Prudhoe Bay
Color
Well Job# Log Description Date Blueline Prints CD
D.S.2-05A - O~., ~ 23376 MCNL 06/02/03 1 1 13) ?Yo
H·21A ~ 23319 MCNL 05/09/03 1 1 J,Î' J<~:-\
E-02A 'i'" 23275 MCNL 03/15/03 1 1 )~J.~¥
NK·62A a~~ 23277 MCNL 04/27/03 1 1
E-01A ~- ~ 23280 MCNL 04/12/03 1 1 l~r
P2-54A B-O 23274 MCNL 03/27/03 1 1 ~).'l;
D-22B -I~ 23348 MCNL OS/22/03 1 1 J~Jc-;1
D.S. 2-08B) 5S -D '7 MEM PROD PROFILE 05/31/03 1
J-26 LDL 06/20/03 1
D.S. 2-29A LDL 06/22/03 1
D.S.15-28 LDL 06/21/03 1
D.S.12-20 LDL 06/03/03 1
J-08 LDL 06/26/03 1
D.S. 2-25 PRODUCTION PROFILE 06/07/03 1
PSI-01 TEMPERATURE WARMBACK LOG 06/09/03 1
PSI-06 TEMPERATURE WARMBACK LOG 06/13/03 1
PSI-09 TEMPERATURE WARMBACK LOG 06/19/03 1
K-317B SBHP SURVEY 04/05/03 1
C-04A SBHP SURVEY 06/26/03 1
PLEASE ACKNOWLEDGE RECEIPT BY SIGNING AND RETURNING ONE COpy EACH TO:
BP Exploration (Alaska) Inc.
Petrotectnical Data Center LR2-1
900 E. Benson Blvd.
Anchorage, Alaska 99508
Schlumberger GeoQuest
3940 Arctic Blvd, Suite 300
Anchorage, AK 99503-5711
ATTN: Beth
RECEIVED
07/02/03
0,--,""
-~~";
Date Delivered:
JuLd3 2003
Received ~- ~ l. ~ "- G ~ ~rt:::-/"'{"'...
Alaska o.~i & Gas Cons. Commi8eton
Anchorage
1. Status of Well
181 Oil 0 Gas 0 Suspended 0 Abandoned 0 Service
~. Name of Operator
BP Exploration (Alaska) Inc.
3. Address
P.O. Box 196612, Anchorage, Alaska 99519-6612
4. Location of well at surface
1253' SNL, 5021 WEL, SEC. 06, T11 N, R14E, UM
At top of productive interval
381' NSL, 15311 EWL, SEC. 32, T12N, R14E, UM X = 666462, Y = 5977496 10. Well Number
At total depth
12921 NSL, 1125' EWL, SEC. 32, T12N, R14E, UM X = 666032, Y = 5978391
5. Elevation in feet (indicate KB, OF, etc.) 6. Lease Designation and Serial No.
KBE = 551 ADL 028299
12. Date Spudded 13. Date T.D. Reached 14. Date Comp., Susp., or Aband.
4/2/2003 4/11/2003 4/13/2003
17. Total Depth (MD+TVD) 18. Plug Back Depth (MD+TVD) 19. Directional Survey
10737 9043 FT 10702 9044 FT 181 Yes 0 No
22. Type Electric or Other Logs Run
SGRC, GR, EWR, MGR, CCL, CNL
23.
CASING
SIZE
20"
13-3/8"
9-5/8" x 11-3/4"
24. Perforations open to Production (MD+ TVD of Top and
Bottom and interval, size and number)
2" Gun Diameter, 4 spf
MD TVD
100001 - 10200' 9050' - 9050'
10350' - 10510' 9051' - 9051'
10570' - 10690' 9048' - 9045'
Flow Tubing Casing Pressure CALCULATED
Press. 857 24-HoUR RATE
7"
WT. PER FT.
94#
72#
47#
29#
8.81# / 6.2# / 6.16#
27.
Date First Production
April 18, 2003
Date of Test Hours Tested
4/29/2003 4
)
STATE OF ALASKA
ALASKA OIL AND GAS CONSERVATION COMMISSION
WELL COMPLETION OR RECOMPLETION REPORT AND LOG
Classification of Service Well
7. Permit Number
203-033
X = 664471, Y = 5975811
8. API Number
50- 029-20166-01
9. Unit or Lease Name
Prudhoe Bay Unit
E-01A
11. Field and Pool
Prudhoe Bay Field I Prudhoe Bay Pool
15. Water depth, if offshore 16. No. of Completions
NI A MSL One
20. Depth where SSSV set 21. Thickness of Permafrost
(Nipple) 19731 MD 1900' (Approx.)
GRADE
H-40
N-80
N-80
N-80
L-80
CASING, LINER AND CEMENTING RECORD
SETTING DEPTH HOLE
Top BOTTOM SIZE
Surface 104' 26"
Surface 2698' 18-1/2"
Surface 8771' 12-1/4"
8229' 9255' 8-1/2" 461 sx Class 'G I
8944' 10737' 3-3/4" 93 sx Class 'G'
· 3-1/2" x 3-3/16" x 2-7/8"
CEMENTING RECORD
100 sx Cement
286 sx High Yield, 4230 sx PF
925 sx Howco Light. 250 sx 'G', 420 sx PF
AMOUNT PULLED
25.
TUBING RECORD
DEPTH SET (MD)
8256'
PACKER SET (MD)
SIZE
7",29#, N-80
MD
TVD
26.
ACID, FRACTURE, CEMENT SQUEEZE, ETC.
DEPTH INTERVAL (MD) AMOUNT & KIND OF MATERIAL USED
22001 Freeze Protected with MeOH
PRODUCTION TEST
Method of Operation (Flowing, gas lift, etc.)
Flowing
PRODUCTION FOR OIL-BBL
TEST PERIOD 1 ,795
OIL-BBL
GAs-McF
22,197
GAs-McF
WATER-BBL
19
WATER-BBL
CHOKE SIZE
95°
GAS-OIL RATIO
12,363
OIL GRAVITY-API (CORR)
RECCIVcfj
28.
CORE DATA
Brief description of lithology, poro~ity. fract_ures~ ~pparent dips and presence of oil, gas or water. SUbmtfÂ~ cîiP5 2003
No core samples were taken.
Form 1 0-407 Rev. 07-01-80
~. !J)iJ!Þ3 -
, ',I'~- r--:, "\; -, ~
;I~:L.'..
~. .;
" ~\lI'" '..,,~ .... .'.
~\""!IO';'~IiJI1~'"'''' "~""LIõ.i."".,:... ...,',~..:J. .',
Alaska Oil & Gas Cons. Commissiofi
~AY 1 Anchorage
'" ~ 2003
RBDMs BFl
Ç¡ç
Of? leI '~J ^ L
¡~:~ ! L;: ~ : .'" 14
Submit In Duplicate
)
')
29.
Geologic Markers
30.
Formation Tests
Marker Name
Measured
Depth
True Vertical
Depth
Include interval tested, pressure data, all fluids recovered and
gravity, GOR, and time of each phase.
Shublik A
9293'
8761'
Shublik B
9308'
8774'
Shublik C
9323'
8788'
Sadlerochit / Zone 4A
9348'
8809'
Zone 4A (43N)
9391'
8845'
Zone 3
9458'
8898'
Zone 2C
9554'
8968'
Zone 28
9617'
9008'
31. List of Attachments:
Summary of Daily Drilling Reports, Surveys
32. I hereby certify that the foregoing is true and correct to the best of my knowledge
Signed Terrie HUbbl.~ f.l, ~ Title Technical Assistant
E-01 A
Well Number
203-033
Permit No. I Approval No.
Date tf;. /-4·D~
Prepared By Name/Number: Terrie Hubble, 564-4628
Drilling Engineer: Alistair Sherwood, 564-4378
INSTRUCTIONS
GENERAL: This form is designed for submitting a complete and correct well completion report and log on all types of lands and leases in Alaska.
ITEM 1: Classification of Service Wells: Gas injection, water injection, steam injection, air injection, salt water disposal, water supply for injection, observation,
injection for in-situ combustion.
ITEM 5: Indicate which elevation is used as reference (where not otherwise shown) for depth measurements given in other spaces on this form and in any
attachments.
ITEM 16 AND 24: If this well is completed for separate production from more than one interval (multiple completion), so state in item 16, and in item 24 show the
producing intervals for only the interval reported in item 27. Submit a separate form for each additional interval to be separately produced, showing the data
pertinent to such interval.
ITEM 21: Indicate whether from ground level (GL) or other elevation (DF, KB, etc.).
ITEM 23: Attached supplemental records for this well should show the details of any multiple stage cementing and the location of the cementing tool.
Ii EM 27: Method of Operation: Flowing, Gas Lift, Rod Pump, Hydraulic Pump, Submersible, Water Injection, Gas Injection, Shut-In, Other-explain.
ITEM 28: If no cores taken, indicate 'none'.
Form 10-407 Rev. 07-01-80
)
)
BP EXPLORATION
Operations Summary Report
Accept rig at 17:30 hours.
Pressure test BOP stack, and related equipment. Witnessed
by AOGCC, Jeff Jones.
Finish BOP test. All passed. Will do inner reel valve after
pigging.
Continue chain swap on injector from 2" to 2.375". Stab pipe.
Make up Baker CTC. Pull test to 35 klbs.
Make up hose to CTC. Pig coil with dart. CT dart
Vol=56.4bbls PT CTC to 3500psi, good test.
LD dart catcher. Circulate CT. Prep to pickup milling
assembly.
Pre Spud: Discuss plan forward and success criteria for
sidetrack with crew. PJSM prior to picking up milling assembly.
PU Milling assembly: New HC 3.8" diamond whipstock mill
(DP0261), Used HC 3.8" diamond string reamer, Xtreme MM,
Dual CS(3/4"ball), DSC(7/8" ball), XO, 2jts 2-3/8" PH6, XO,
DBPV, CTC. Drift PH6 to 1".
RIH with window milling BHA #1. Send MeOH freeze protect to
green tank. RIH to 8950'md. Park CT.
PT cement plug to 2,OOOpsi WHP. Flatline, good test.
At 8950'md, PU wt=47K. Continue RIH to mill nipple. RIH
wt=30K. Tag nipple at 9043'. Correct CT depth to 9006'md,
subtract 37'. PU.
Bring pump rate up to 2.5bpm, Freespin=1130psi. Ease into
milling nipple. Takes 3 tries to get consistent milling started,
had to PU before stalling motor. 230psi, Motor work. Mill thru
nipple, drift dry, looks clean.
WEXIT RIH to whipstock tray. Tag at 9386'md. Clean PU, Likely
cement, not pinch point. Freespin=1170. Mill cement at
0.8fpm w/ 120-180psi motor work. Stall at 9389.4 PU. RBIH,
Getting solid motor work, call this the pinch point. Correct CT
depth to 9394.6' (expected pinch point). Flag pipe, EOP @
9310'. May still be milling cement. Call pinch point 0.3' lower
at 9394.9'. Mill to 9396.9', with 60-450psi motor work, Stall, PU
and start over.
WEXIT Cannot get past 9395.1, start milling at 9395.1, stall. PU 20K
over. Losing ground, sit back down at 9394.1 Mill for 10min
and stall, PU, 30K overpull. RBIH sit down at 9393, losing
more ground. Tail Pipe backed off? Decide to POH to PU
nipple locator. Note: we had a small amount of gas back at
Legal Well Name:
Common Well Name:
Event Name:
Contractor Name:
Rig Name:
E-01
E-01
REENTER+COMPLETE
NORDIC CALISTA
NORDIC 1
Date From -·To Hours Task Code NPT Phase
3/28/2003 03:00 - 12:30 9.50 MOB P PRE
12:30 - 13:00 0.50 MOB P PRE
13:00-13:15 0.25 MOB P PRE
13:15 -14:00 0.75 MOB P PRE
14:00 - 16:00 2.00 RIGU P PRE
16:00 - 16:15 0.25 RIGU P PRE
16:15 - 20:00 3.75 RIGU P PRE
20:00 - 00:00 4.00 BOPSURP PRE
3/29/2003 00:00 - 01 :40 1.67 BOPSUR P PRE
01 :40 - 05:00 3.33 RIGU P PRE
05:00 - 05:30 0.50 STWHIP P WEXIT
05:30 - 06:45 1.25 STWHIP P WEXIT
06:45 - 07:00 0.25 STWHIP P WEXIT
07:00 - 07: 1 0 0.17 STWHIP P WEXIT
07: 1 0 - 08:00 0.83 STWHIP P WEXIT
08:00 - 09:30 1.50 STWHIP P WEXIT
09:30 - 09:45 0.25 STWHIP P WEXIT
09:45 - 09:50 0.08 STWHIP P WEXIT
09:50 -10:15 0.42 STWHIP P WEXIT
10:15 - 13:20
3.08 STWHIP P
13:20 -14:10
0.83 STWHIP P
Page 1 of 16
Start: 3/28/2003
Rig Release:
Rig Number:
Spud Date: 8/16/1975
End:
Description of Oþerations
Move rig from P2-54 to E-Pad. Took 6hrs to traverse the ice
road.
Arrive at E-Pad. Position rig in front of E-01.
PJSM prior to moving rig over well.
Position rig over E-01. Align tree with BOPE stack.
Prep cellar. Tree is too short, call out for an additional spool
piece to raise tree height. Change inserts on injector for 2-3/8"
CT, swap out rams for 2-3/8".
PJSM prior to swapping 2" reel for 2-3/8" reel with crane.
Remove 2" reel with crane, remove bushings from 2" reel to
use in new reel. Install 2' high, 7" diameter spool piece on tree.
RU outside tanks and berms.
Printed: 4/14/2003 9:29: 11 AM
)
')
BP EXPLORATION
Op.erationsSummary Rep.ort
Page 2 of 16
Legal Well Name:
Common Well Name:
Event Name:
Contractor Name:
Rig Name:
E-01
E-01
REENTER+COMPLETE
NORDIC CALISTA
NORDIC 1
Start: 3/28/2003
Rig Release:
Rig Number:
Spud Date: 8/16/1975
End:
Date From - To Hours Task Code NPT Phase Description of Operations
3/29/2003 13:20 -14:10 0.83 STWHIP P WEXIT surface with bottoms up, this was likely gas trapped behind
tubing tail that was released when the tail fell.
14:10 -15:30 1.33 STWHIP N DPRB WEXIT POH
15:30 - 16:30 1.00 STWHIP N DPRB WEXIT LD motor and mill. PU nipple locator set for 25001b. overpull
and a bullnose nozzle.
16:30 - 18:00 1.50 STWHIP N DPRB WEXIT RIH BHA #2 to 9100 uncorrected depth.
18:00 - 18:45 0.75 STWHIP N DPRB WEXIT POH at 11fpm, string wt=46-47K. PU to 8988' (this would be
8951 if we had subtracted 37' like we did on BHA#1) no
indication of nipple locator finding nipple. RIH to tag up on
bottom, 9418 uncorrected, 3' above where we last tagged.
18:45 - 20:30 1.75 STWHIP N DPRB WEXIT No indication of any nipple on TEL. POOH.
20:30 - 21 :00 0.50 STWHIP N DPRB WEXIT Lay down Baker TEL BHA.
21 :00 - 21 :30 0.50 STWHIP N DPRB WEXIT Safety meeting to discuss dropped tool incident, and need to
keep focus on job at hand.
21 :30 - 21:45 0.25 STWHIP N DPRB WEXIT Wait on Schlumberger wireline unit.
21 :45 - 22:15 0.50 STWHIP N DPRB WEXIT RU Schlumberger E-line unit.
22:15 - 00:00 1.75 STWHIP N DPRB WEXIT Log with SWS 2.125" GR-CCL. Confirmed that tail pipe is
backed off. The fish appears to be sitting on top of the
whipstock.
3/30/2003 00:00 - 01 :00 1.00 STWHIP N DPRB WEXIT Continue with GR-CCL log.
01 :00 - 02:30 1.50 STWHIP N DPRB WEXIT Lay down GR-CCL. Rehead test p~s tool, and orient for high
side exit.
02:30 - 02:45 0.25 STWHIP N DPRB WEXIT Safety meeting prior to picking up whipstock.
02:45 - 03:00 0.25 STWHIP N DPRB WEXIT Attach SWS setting tool to whipstock.
03:00 - 06:45 3.75 STWHIP N DPRB WEXIT RIH, set Baker Gen II 4.5" x 7" whipstock at 9355', TF=28 deg
left of high side. RA tag at 9365'. Nearest casing colar is 7'
above top of whipstock. POOH
06:45 - 07:15 0.50 STWHIP N DPRB WEXIT LD Whipstock setting assembly, RD wireline.
07: 15 - 07:30 0.25 STWHIP N DPRB WEXIT Safety meeing prior to PU milling assembly and sending eline
lubricator down beaver slide.
07:30 - 08:00 0.50 STWHIP N DPRB WEXIT PU BHA #3: Re-Run HC 3.8" diamond whipstock mill
(DP0261), Used HC 3.8" diamond string reamer, Xtreme MM,
Dual CS(3/4"ball), DSC(7/8" ball), XO, 2jts 2-3/8" PH6, XO,
DBPV, CTC.
08:00 - 09:40 1.67 STWHIP N DPRB WEXIT RIH with window milling assembly. PU wt= 48K, just above
whipstock.
09:40 - 10:00 0.33 STWHIP N DPRB WEXIT Tag whipstock pinch point, PU=55k. PU and slowly RH,
Freespin=1110psi. RIH, see slight motor work and correct CT
depth to pinch point at 9359.6' (subtract 30.8'). Flag pipe at
pinch point, EOP flag=9275.5'. Ease into window milling
100-200psi motor work. Mill to 9360.6' in 0.1' intervals.
10:00 - 11 :00 1.00 STWHIP P WEXIT Milling from 9360.7', 1360psi, 2.5/2.5bpm. As motor work drills
off continue milling in 0.1' intervals. PVT=194
11 :00 - 12:00 1.00 STWHIP P WEXIT Milling from 9362.1', 1450psi, 2.5/2.5bpm.
12:00 - 13:00 1.00 STWHIP P WEXIT Milling from 9363.2', 1475psi, 2.5/2.5bpm. Should be near
midpoint of window.
13:00 - 13:45 0.75 STWHIP P WEXIT Milling from 9364.0', 1450psi, 2.5/2.5bpm.
13:45 -14:45 1.00 STWHIP P WEXIT Milling from 9365.3', 1700psi, 2.5/2.5bpm. See sharp motor
work increase. Could be a centralizer. See another sharp
motor work increase at 9365.8' to 1900psi. This is likely the
whipstock mill exiting the casing. Continue in 0.1' increments
and let the string mill work. Mill to 9367'.
14:45 - 16:35 1.83 STWHIP P WEXIT Continue milling, ROP increase, ouside casing. Drill formation
Printed: 4/14/2003 9:29: 11 AM
)
")
BP EXPLORATION
Operations. Summary. Report
Page 3 of 16
Legal Well Name:
Common Well Name:
Event Name:
Contractor Name:
Rig Name:
E-01
E-01
REENTER+COMPLETE
NORDIC CALISTA
NORDIC 1
Start: 3/28/2003
Rig Release:
Rig Number:
Spud Date: 8/16/1975
End:
Date From '- To Hours Task Code NPT Phase Description of Operations
3/30/2003 14:45 - 16:35 1.83 STWHIP P WEXIT to 9377'md. PU and backream up into window at .5fpm,
2.4bpm, 1200-1250psi. TOW=9359.6, BOW=9365.9 (6.3' long
window). Ream down. Repeat reaming/backreaming round
trips 3x. Window is clean. Send 2ppb bio pill around.
16:35 - 17:10 0.58 STWHIP P WEXIT Circulate around new flo-pro mud (3% Lubetex, 6ppb Klagard,
65+LSRV).
17:10 - 19:30 2.33 STWHIP P WEXIT POH displacing hole to new Flo-Pro.
19:30 - 20:00 0.50 STWHIP P WEXIT Tag up at surface. Rig down milling BHA. Found BHA below
disconnect missing. Fish left in hole consists of D331 DSM,
Diamond SR, Baker Xtreme motor, lower disconnect half. The
BHA above the upper disconnect half was recovered ok.
Note - The disconnect was not activated. The dogs were in the
engaged position and the shear pins were still good! It is
suspected there is either a split lower disconnect half, or the lip
of the G profile has been pulled off. Conventional fishing with a
G spear will most likely be unsuccessful.
20:00 - 23:00 3.00 STWHIP N DFAL WEXIT Call town and notify engineer of failure. Discuss with Baker TT
and with BP slickline supervisor on slope. Best plan forward is
to attempt to spear fish with slickline using a small profile below
the internal "G" profile. Wait on fishing eq. and slickline unit.
23:00 - 00:00 1.00 STWHIP N DFAL WEXIT Minor accident involving Sperry Sun night hand. Minor cut to
face requiring medical attention at BOC medic. Still under
investigation.
Continue to wait on slickline unit.
3/31/2003 00:00 - 01 :00 1.00 STWHIP N DFAL WEXIT Continue to wait on slickline unit.
01 :00 - 01: 15 0.25 STWHIP N DFAL WEXIT Safety meeting with slickline crew prior to rigging up.
01:15 - 02:00 0.75 STWHIP N DFAL WEXIT Rig up slickline unit.
02:00 - 03:45 1.75 FISH N DFAL WEXIT RIH with LIB in an attempt to determine if lower disconnect has
split fishing neck. The recovered LIB indicates that the lower
disconnect is not belled or split.
03:45 - 04: 15 0.50 FISH N DFAL WEXIT Rig up 1.308" internal spear for fishing the polished bore profile
below G profile.
04:15 - 05:30 1.25 FISH N DFAL WEXIT RIH with 1.308" spear. Set down on fish. Confirmed we have
latched into fish. Pull up hole heavy off bottom. Hung up on
4.5"x7" packer. Could not get thru. Could go down easily, but
not up thru packer. Work up and down 20-30 times. Finally
lost fish. POH to inspect slickline fishing BHA.
05:30 - 05:50 0.33 FISH N DFAL WEXIT Tag up at surface. Found GR spear has pulled out (GR is a
mechanical up-shear disconnect). The fish is now baited. The
spear and G profile is still in the hole. Rig up with a GS spear
(Mechanical down-shear release).
05:50 - 06:30 0.67 FISH N DFAL WEXIT RIH for second fishing attempt. Latched into fish easily. Pulled
up hole and hung up at square sholder on top of disconnect
lower half at the 4.5"x7" packer again. Worked it 20-30 times,
and finally lost the fish. POH to inspect fishing BHA, and
reconfigure to attempt something new.
06:30 - 07:30 1.00 FISH N DFAL WEXIT Tag up at surface. Found the spear that we ran on fishing run
1 had pulled out of the lower disconnect half. All fishing eq has
been recovered. Standby for HES slickline crew changeout.
Rig up GS spear + 3-3/8" centralizer above.
Printed: 4/14/2003 9:29: 11 AM
J
)
Operations Summary Report
Legal Well Name:
Common Well Name:
Event Name:
Contractor Name:
Rig Name:
E-01
E-01
REENTER+COMPLETE
NORDIC CALISTA
NORDIC 1
Start: 3/28/2003
Rig Release:
Rig Number:
Spud Date: 8/16/1975
End:
Date From - To Hours Task Code· NPT Phase Description of Operations
3/31/2003 07:30 - 09:00 1.50 FISH N DFAL WEXIT RIH for third fishing attempt. Unable to latch up with fish,
centralizer may be misaligning the GS just enough to keep it
from latching up. POH to inspect fishing BHA. Hung up on
WD Packer with rope socket. Work past, POH.
09:00 - 09:30 0.50 FISH N DFAL WEXIT Tag up at surface. All fishing equip recovered. Found the
brass pins on the GS had sheared. Rig up GS (Steel pinned),
dual knuckle joint, 3.38 centralizer. The knuckle joint should
help us get into the G profile easier.
09:30 - 10:45 1.25 FISH N DFAL WEXIT RIH for fourth fishing attempt. Latch fish and POH with fish.
Entire fish recovered.
10:45 -11 :15 0.50 FISH N DFAL WEXIT PJSM prior to LD slickline tools and fish.
11 :15 - 12:00 0.75 FISH N DFAL WEXIT LD slickline tools, LD Motor and mills. RD slickline. No
indication that the lower disconnect failed, in good condition
compared to new one. Hmm. Window mill had good wear
pattern in the center and both mills gaged at 3.8".
12:00 - 13:20 1.33 DRILL P PROD1 PU Drilling assembly, Used DPI bicenter 3.75x4-1/8", 1.04deg
Baker HP motor, Sperry orientor, Sperry MWD, DS MHA, DS
CTC. Install new CTC. Press test and pull test CTC, good
test. Nice beveled edge on top of CTC.
13:20 -15:15 1.92 DRILL P PROD1 RIH to 9260'md
15:15 -15:50 0.58 DRILL P PROD1 Log tie in. Subtract 26'.
15:50 - 16:00 0.17 DRILL P PROD1 Continue RIH.
16:00 - 16:45 0.75 DRILL P PROD1 Tag up at 9369.8'. Should be in OH. PU 4', Bring pumps up
to 2.9bpm, RIH, immediate stall. PU, 1 OK overpull, pop free.
PU above whipstock. RIH, tag up at 9360'md. Unable to get
back thru window with TF at 35R. PU, 10K overpull, pop free.
PU above whipstock, orient TF to 39L (whipstock tray TF=
28L), RIH, tag @ 9360'. Make a couple of attempts with
pumps on, motor goes into an immediate stall when it tags up
at 9360'. Decide to POH.
16:45 - 18:20 1.58 STWHIP N DPRB WEXIT POH
18:20 - 19:00 0.67 STWHIP N DPRB WEXIT LD Drilling BHA. Bit recovered graded 1,6. Cutters were badly
chipped and missing on wing section of bi center bit.
19:00 - 23:30 4.50 STWHIP P WEXIT Rig stand down. Shut down operations on rig. Hold
comprehensive safety meeting with rig crew, all contractors
assigned to rig, tool pusher, SWS team leader, and SSD safety
rep. Discuss recent accidents and incidents. Shutdown for
inspection of each individuals opperating area. Discuss each
persons stop cards written on safety aspects of his particular
area. Make list of action items. Take unsafe eq out of service.
Over 130 stop cards turned it.
23:30 - 00:00 0.50 STWHIP N DPRB WEXIT Resume normal rig operations. Make up Baker Coil connector.
4/1/2003 00:00 - 00:30 0.50 STWHIP N DPRB WEXIT Continue making up CTC. Pull test to 35klbs, ok. PT to 3500
psi, ok.
00:30 - 01 :00 0.50 STWHIP N DPRB WEXIT Make up cleanoutlwindow dressing BHA. BHA #5. BHA is as
follows; Used Hughes D0261 DSM, Baker SR, Xtreme motor,
CS, DISC, PH6, CHKS, CTC.
01 :00 - 02:30 1.50 STWHIP N DPRB WEXIT RIH with BHA #5 to cleanoutldress window.
02:30 - 03:00 0.50 STWHIP N DPRB WEXIT Stop at 8900', make a -26' correction to depth. (Same
correction used on last run). Check PU weight at 44klbs. RIH
Dry tag at 9357'. PU and kick on pumps. Free spin 2.7 bpm,
2200 psi. 2.5 bpm, 2075 psi. Creep down and tag up at
9355.7'. (Note - Whipstock top at 9355', top of window at
Printed: 4/14/2003 9:29:11 AM
)
.)
BP EXPLORATION
Opera.tionsSummary Report
9359.6'). Mill down. Taking bites and getting good mill offs.
Getting serious motor work. More than just a burr on the
window?
03:00, 9356.8', 180 psi motor work, 500# weight on bit.
03:30,9358.0',395 psi motor work, 3900# weight on bit. We
are definately milling up something significant.
04:00,9358.6',286 psi motor work. 4900 # weight on bit.
9359.0', Stacked weight and no drill off. PU at 42klbs, Free
spin=2000 psi at 2.5 bpm. Resume milling. 2.5/2.1/2303 psi.
Pit vol=297 bbls. All indications point to us milling another
window.
9359.2', Getting typical drill offs every 0.1' added. Still milling
2.5/2.3/2450 psi. Pit vol = 295 bbls.
9359.6', Had drilling break. Motor work dropped off. May be
thru window.
9360.5', Geo reports we are getting good formation sand. Try
pushing on it and seing if we can drill. Able to drill ahead at 24
fph. We appear to be in open hole. We milled 9356'-9359.6'.
Plan to drill 20' of open hole. Drill OH to 9380'.
DPRB WEXIT PU Backream 1990-2090psi, PU 40-42K. Backreaming,
150-200psi motor work at 9361.5, 9360.2. Ream down
throught window to 9380' no motor work. PU backream past
top of whipstock, looks clean. RIH with pumps off, 15fpm set
down at 9361, PU, repeat set down at same spot with pumps
off. PU, Bring pumps up to 0.5bpm, RIH, pass by 9361' no
problem very small bump in motor work. RIH to 9380'md. PU,
backreaming at 2.5bpm, park & work spot at 9361'. Make
several passes, sit down at 9361' with pupms off on some of
the trips, pass by with no wt bobble or motor work on others.
Inconsistent drifting dry as we RIH. Plan to pick up crayola
mill. Flag EOP at 9200' (RED).
POH with window milling assembly.
PJSM. Discuss how complacency can result in severe injuries
in our operation. Risk analysis of LD/PU milling assembly.
LD window milling assembly. PU dressing assembly: metal
muncher crayola mill, diamond string reamer.
RIH with dressing assembly.
Safety stand down with day tour rig hands. Shut down
operations. Have 1 night coil hand dry watch pumps and pipe
while doing safety meetings.
Stop at EOP flag. Make -28' correction. RIH and mill window.
Kick pumps on, free spin. 2.4 bpm, 1870 psi, 2.5/1950 psi. Mill
down and back up at 10 fpm thru bad area. Did not see any
motor work. Repeat, still not motor work. Dry tag up and down
thru window 6 times. Never saw any drag up or down thru
window.
POH.
LD BHA. String mill and tapered mill in gauge.
Rehead coil connector. Pull test to 30Kips, pressure test to
3,800 psi.
MU drilling BHA.
RIH.
Log to tie in.
Legal Well Name:
Common Well Name:
Event Name:
Contractor Name:
Rig Name:
E-01
E-01
REENTER+COMPLETE
NORDIC CALISTA
NORDIC 1
Date From.;., To Hours Task Code NPT Phase·
4/1/2003 02:30 - 03:00 0.50 STWHIP N DPRB WEXIT
03:00 - 03:30 0.50 STWHIP N DPRB WEXIT
03:30 - 04:00 0.50 STWHIP N DPRB WEXIT
04:00 - 04:35 0.58 STWHIP N DPRB WEXIT
04:35 - 05:00 0.42 STWHIP N DPRB WEXIT
05:00 - 05:30 0.50 STWHIP N DPRB WEXIT
05:30 - 06:00 0.50 STWHIP N DPRB WEXIT
06:00 - 07:30 1.50 STWHIP N DPRB WEXIT
07:30 - 09:45
2.25 STWHIP N
09:45 - 11: 15 1.50 STWHIP N DPRB WEXIT
11: 15 - 11 :45 0.50 STWHIP N DPRB WEXIT
11 :45 - 12:15 0.50 STWHIP N DPRB WEXIT
12:15 - 13:00 0.75 STWHIP N DPRB WEXIT
13:00 - 16:00 3.00 STWHIP P WEXIT
16:00 - 17:35 1.58 STWHIP N DPRB WEXIT
17:35 -19:15 1.67 STWHIP N DPRB WEXIT
19:15 - 20:00 0.75 STWHIP N DPRB WEXIT
20:00 - 20:30 0.50 STWHIP N DPRB WEXIT
20:30 - 21 :30 1.00 STWHIP N DPRB WEXIT
21 :30 - 23:40 2.17 STWHIP N DPRB WEXIT
23:40 - 00:00 0.33 STWHIP N DPRB WEXIT
Page 5 of 16
Start: 3/28/2003
Rig Release:
Rig Number:
Spud Date: 8/16/1975
End:
Descri ption of Operations
Printed: 4/14/2003 9:29:11 AM
Legal Well Name:
Common Well Name:
Event Name:
Contractor Name:
Rig Name:
')
BP EXPLORATION
Operations Summary Report
E-01
E-01
REENTER+COMPLETE
NORDIC CALISTA
NORDIC 1
Start: 3/28/2003
Rig Release:
Rig Number:
'')
I
Spud Date: 8/16/1975
End:
Date From ~ To Hours Task Code NPT Phase Descri ption of Operations
4/2/2003 00:00 - 01:15 1.25 DRILL P PROD1 Tie in. -28' correction.
01:15 - 03:25 2.17 DRILL P PROD1 Run through window without pump. Did not have any problem
going through window. Bring up pumps. TF came up 28 R of
HS. Tag bottom at 9,382'. Drill at 2.9 bpm, 2,900 psi off btm,
3,120 psi on bottom, 65 fph, TF=HS. Motor yielding 8 to 12
degree doglegs. Need to get 21 deg. doglegs.
03:25 - 05:20 1.92 DRILL P PROD1 POH to change bend in motor.
05:20 - 06:40 1.33 DRILL P PROD1 Change motor bend and MWD probe. G totals were not
acceptable on MWD probe on last run.
06:40 - 07:20 0.67 DRILL N WAIT PROD1 Wait on Hughes bi center bit.
07:20 - 07:45 0.42 DRILL P PROD1 Make up bit to BHA. Stab on injector.
07:45 - 09:40 1.92 DRILL P PROD1 RIH, shallow hole test at 950', passed ok, continue RIH. No
problems running thru packer.
09:40 - 10:30 0.83 DRILL P PROD1 Try running thru window with pumps off. hung up 2 times at
9365'. This should be the bottom of the window. Pick up to
orient. Tool face was 56 R at power up. Orient around to 45L.
Shut pumps down, RIH. Set down at 9365'. Repeat. Set down
again. PU, orient to 34L. RIH, made it thru ok. Orient to high
side.
10:30 - 11 :45 1.25 DRILL P PROD1 Begin drilling. Grabby on bottom with several stalls. ROP
slow. Sperry MWD not giving good survey data. They are
useing a "taperlock" string. G totals are too high. The gamma
sensor has also failed.
11 :45 - 12:00 0.25 DRILL P PROD1 Not getting any good survey data. Pick up off bottom. No
survey data. Cycle pumps. No good survey data. Haven't got
any survey data since we have started drilling open hole.
Heck, the only thing working is tool face.
12:00 - 13:45 1.75 DRILL P PROD1 Resume drilling. Still no directional data. Plan to drill 40' more
to ensure we are past any possible junk prior to tripping. ROP
seems to be variable. Up to 100 fph, then down to 10 fph.
Geo reports we are in zone 3 with conglomerate and pyrite.
13:45 -14:10 0.42 DRILL P PROD1 Can't drill blind. Pickup to try to get an off bottom survey.
Can't get an off bottom survey, even using all of our Mojo.
14:10 - 15:50 1.67 DRILL N DFAL PROD1 Can't drill blind. POOH to pick up a new MWD probe. Will go
back in the hole with the solar style instead of taperlock.
15:50 -17:00 1.17 DRILL N DFAL PROD1 Tag up at surface. Lay down Sperry MWD probe. Bit was
ringed badly on pilot section. Graded 8-5. Change out probes.
Left motor bend the same, 2.8 deg.
17:00 - 19:00 2.00 DRILL N DFAL PROD1 RIH. Shallow hole test of MWD. Always works fine at surface.
Continue RIH. Shut down pumps to go through window. Set
down 3K at bottom of window and popped through. Tag
bottom. Correct depth, -28'.
19:00 -19:15 0.25 DRILL P PROD1 Mad pass footage drilled w/o gamma ray.
19:15 - 22:00 2.75 DRILL P PROD1 Drill at 2.6 bpm, 3,080 psi, TF 60 - 80L, ROP 10 - 25 fph. G
totals out on surveys. Getting good short survey every 3rd or
4th survey.
22:00 - 22:45 0.75 DRILL P PROD1 Pick up off bottom and shot surveys. Still having trouble
getting good surveys.
22:45 - 00:00 1.25 DRILL P PROD1 Drill at 2.6 bpm, 2,780 psi, TF 40L, ROP 20 - 60 fph. ROP
increased to 60 - 80 fph and surveys cleaned up after getting
into zone 2.
4/3/2003 00:00 - 02:00 2.00 DRILL P PROD1 Drill build and turn to 9,680'.
Printed: 4/14/2003 9:29:11 AM
")
)
EXPLORATION
Operations Summary R.eport
Legal Well Name:
Common Well Name:
Event Name:
Contractor Name:
Rig Name:
E-01
E-01
REENTER+COMPLETE
NORDIC CALISTA
NORDIC 1
Start: 3/28/2003
Rig Release:
Rig Number:
Spud Date: 8/16/1975
End:
Date From- To Hours Task Code NPT Phase Descri ption of Operations
4/3/2003 02:00 - 05:00 3.00 DRILL P PROD1 POH to change motor bend to 1 degree and PU resistivity.
05:00 - 07:00 2.00 DRILL P PROD1 Tag up. Change out bit. Hycalog bit recovered and graded 5,2
with several chipped and 1 missing gauge cutters. Change out
motor to 1.37 degree bend. MU resistivity tool. Upload MWD.
PU rerun Hughes 3. 75x4.125" bit.
07:00 - 1 0:05 3.08 DRILL P PROD1 RIH with BHA #10. Shallow hole test at 842'. RIH. Try to run
thru the window dry, set down at 9365' 2 times. PU, found TF
at 32R. Orient to 29L, SO pumps, RIH dry. Tag up. PU take 1
click. RIH dry. Hung up. Kick on pumps, check orientation.
Found at 34R. Orient around to 29L (Whipstock set at 28L),
RIH at .3 bpm. Set down at 9365'. Pick up, take 1 click. RIH
at .3 bpm. Set down. Try at 0.6 bpm. set down. WeilL.......?,
try taking 1 click and running down at minimum rate to hold tool
face to see if we can get thru window. AT TF of 8L we
seemed to get 3' deeper. Try working it up and down. No go.
Pick PU higher w/o taking a click. Ratty overpull on pickup.
Finally got thru. Whew! Running liner may prove interesting.
10:05 - 11 :00 0.92 DRILL P PROD1 Log MAD pass for resistivity and to tie in GR at pip tag. Make
-6' correction.
11 :00 - 11 :40 0.67 DRILL P PROD1 Orient to 65L.
11:40-12:15 0.58 DRILL P PROD1 9680', begin drilling. Free spin=2850 psi at 2.7 bpm. Drilling at
2.7/2.7/3200 psi. Pit vol=272 bbls, IAP=5 psi, OAP=15 psi.
12: 15 - 12:50 0.58 DRILL P PROD1 Orient 1 click. Having to pick up to the window to get clicks.
12:50 - 14:20 1.50 DRILL P PROD1 Resume drilling.
14:20 - 15:10 0.83 DRILL P PROD1 9720'. Need to get a click. Try getting one up and down the
open hole w/o pulling back thru window. Combination of high
dogleg open hole with stiff resistivity tool makes getting clicks
difficult. Finally got 1 20 and 1 10= degree clicks.
15:10 - 16:15 1.08 DRILL P PROD1 Resume drilling. Able to push on it now that we got that click.
Drilling at 75 fph. 2.7/2.7/2950 psi. 265 bbls pit vol.
16:15 -16:40 0.42 DRILL P PROD1 9800', wiper trip to shoe.
16:40 - 16:55 0.25 DRILL P PROD1 Orient around. Getting good clicks now that we are in lower
dogleg section of hole.
16:55 - 17:50 0.92 DRILL P PROD1 Resume drilling. 140 fph, 2.7/2.7/3130 psi. Pit vol=260 bbls.
17:50 - 18:00 0.17 DRILL P PROD1 9920', Take 2 clicks.
18:00 - 18: 1 0 0.17 DRILL P PROD1 Resume drilling, 135 fph 2.7/2.7/3150 psi. Pit vol=262 bbls.
IAP=8 psi, OAP=23 psi.
18:10 - 19:00 0.83 DRILL P PROD1 Wiper trip to just below window. Hole in good condition.
19:00 - 20:20 1.33 DRILL P PROD1 Drill ahead to 10,052'. TF 30 - 40L. ROP 100 fph. Increase
WOB to get TF to 90L. ROP increased to 250 fph. Max ROP
for MWD tools is 150 fph. Need to orient.
20:20 - 20:50 0.50 DRILL P PROD1 Orient to 90L. Drill to 10,075'. TF rolling up.
20:50 - 21 :30 0.67 DRILL P PROD1 Wiper trip to just below window. RIH.
21 :30 - 22:00 0.50 DRILL P PROD1 Orient to 105 L.
22:00 - 23:40 1.67 DRILL P PROD1 Drill at 2.7 bpm, 2,970 psi off bottom, 3,050 psi on bottom. TF
105 - 60L. ROP 70 - 150 fph.
23:40 - 00:00 0.33 DRILL P PROD1 Orient to 90R.
4/4/2003 00:00 - 00:30 0.50 DRILL P PROD1 Drill to 10,250'.
00:30 - 01 :30 1.00 DRILL P PROD1 Wiper tip to just below window. RIH. Hole in good shape.
01 :30 - 04:25 2.92 DRILL P PROD1 Drill to 10,400' at 2.6 bpm, 3,000 psi, TF 70R - 85R, ROP 60-
120 fph.
04:25 - 06:00 1.58 DRILL P PROD1 Wiper tip to just below window. Tie into RA marker. +2'
correction. RIH. Hole in good shape.
Printed: 4/14/2003 9:29:11 AM
J
)
BP EXPLORATION
Operations Summ~ryReport
Legal Well Name: E-01
Common Well Name: E-01 Spud Date: 8/16/1975
Event Name: REENTER+COMPLETE Start: 3/28/2003 End:
Contractor Name: NORDIC CALISTA Rig Release:
Rig Name: NORDIC 1 Rig Number:
Task Code NPT Phase Description of Operations
4/4/2003 06:00 - 06:20 0.33 DRILL P PROD1 Orient to 90L.
06:20 - 07:35 1.25 DRILL P PROD1 10420', Resume drilling. Making 80 fph. 2.6/2.6/2950 spi.
Drilling at 3100 psi. Pit vol=207 bbls.
07:35 - 07:45 0.17 DRILL P PROD1 10500', 100' short trip.
07:45 - 08: 15 0.50 DRILL P PROD1 Resume drilling. 2.7/2.7/3220 psi. 190 fph. Tearing it up.
08: 15 - 09:25 1.17 DRILL P PROD1 10537', Wiper trip to window. Hole clean up and down.
09:25 - 09:40 0.25 DRILL P PROD1 Resume drilling. 2.7/2.7/3400 psi. ROP=140 fph. Pit vol=193
bbls. Appear to be losing a minor amount of fluid to formation
on trips.
09:40 - 10:00 0.33 DRILL P PROD1 Drilling ahead, and took a stall. PU, and the BHA is pugging.
Cycle pump pressure. Got 2 clicks, but still have higher than
expected pressure. Try to drill with it. Free spin now 2.4 bpm,
3500 psi. Plugged nozzle on bit? Drill ahead, trying to get last
120'.
10:00 - 10:20 0.33 DRILL P PROD1 10556', Orient around.
10:20 - 12:40 2.33 DRILL P PROD1 Resume drilling. Pit vol=182 bbls. Still loosing fluid. It
appears to be down hole. Probably just matrix/sea page losses
due to hi porosity/permability in zone 3.
12:40 - 13:35 0.92 DRILL P PROD1 Drilling in shale. Very slow ROP. Motor may have chunked
earlier today, that is also not helping our progress. Tried
pumping 100 bbls of new, extra slick mud. It didn't help. Make
wiper trip to see if it cleans the hole good enough to drill our
last 60'.
13:35 - 13:45 0.17 DRILL P PROD1 Wiper trip clean to shoe and back. Resume drilling. Free spin
2.5/2.5/2900 psi. Free spin is back to where we started the
tour. Must have spit out the chunk of stator that was plugging
the bit. Drilling at
13:45 - 13:55 0.17 DRILL P PROD1 10620', Orient to 90L.
13:55 -14:15 0.33 DRILL P PROD1 Resume drilling. 2.7/2.7/3560 psi, 135 fph, back into the sand
and makeing great ROP.
14:15 - 15:00 0.75 DRILL P PROD1 TO well, make wiper and tie in pass.
15:00 - 15:35 0.58 DRILL P PROD1 Log tie in pass. Make +2' correction.
15:35 - 16:00 0.42 DRILL P PROD1 Complete wiper trip back into the hole. Tag bottom at 10678'.
16:00 -17:30 1.50 DRILL P PROD1 Log MAD pass up as per geologist. Laying in new extra slick
flowpro mud while POH.
17:30 - 20:00 2.50 DRILL P PROD1 POH at 65 fpm to ensure clean hole in 7". No problems or
overpulls pulling thru window.
20:00 - 21 :30 1.50 DRILL P PROD1 PJSM. LD BHA. Down load MWD.
21 :30 - 21 :45 0.25 CASE P COMP RU for liner drift run.
21 :45 - 22:00 0.25 CASE P COMP Hold after action review for LD BHA. PJSM for drift run.
22:00 - 23:30 1.50 CASE P COMP Stab injector. RIH to EOP flag at 7,300'. Correct depth, -40'.
23:30 - 00:00 0.50 CASE N DPRB COMP RIH to window. Shut down pump. Hung up at 9,362'. Pick up
and try again, same result. Make three attempts at various
pump rates. No luck. Will POH and try different style guide
shoe.
4/5/2003 00:00 - 01 :20 1.33 CASE N DPRB COMP POH to change guide shoe.
01:20 - 02:15 0.92 CASE N DPRB COMP Change guide shoe to round style.
02:15 - 04:00 1.75 CASE N DPRB COMP RIH. Stop at 7,300' EOP flag and make -39.6' correction.
04:00 - 04: 15 0.25 CASE N DPRB COMP Tag up on whipstock at 9,364'. Make several attempts to work
through window with and without pump. No go.
04:15 - 06:00 1.75 CASE N DPRB COMP POH.
06:00 - 06:45 0.75 CASE N DPRB COMP Lay down Liner Dummy run #2. Found same marks on bottom
nose as on run #1. Looks from marks like guide nose is getting
Printed: 4/14/2003 9:29: 11 AM
)
)
BP EXPLORATION
Operations Summary Report
Page 90f 16
Legal Well Name:
Common Well Name:
Event Name:
Contractor Name:
Rig Name:
E-01
E-01
REENTER+COMPLETE
NORDIC CALISTA
NORDIC 1
Start: 3/28/2003
Rig Release:
Rig Number:
Spud Date: 8/16/1975
End:
Date From - To Hours Task Code NPT Phase Description of Operations
4/5/2003 06:00 - 06:45 0.75 CASE N DPRB COMP along side the whipstock instead of down on the tray.
06:45 - 07: 15 0.50 CASE N DPRB COMP Safety meeting prior to making up BHA. Discuss current
situation with well, and plan forward.
07: 15 - 08:45 1.50 CASE N DPRB COMP Make up Liner drift BHA #3. BHA is as follows; Bullnose guide
shoe, bent 10' pup, 2 full joints of liner, Sperry equalizer and
orienter, SWS MHA. Tested orienter at surface, got click for
click.
08:45 - 11 :25 2.67 CASE N DPRB COMP RIH with liner dummy run #3. Tie in to 7300' flag. Make -37'
correction. RIH, pumping 0.5 bpm to lock orienter. RIH and
tag up 9365', same depth as previous runs. PU, SI pumps, let
orienter flop. RIH, tag up. PU, start taking clicks and RIH after
each one. Holding pump rate each time to lock orienter. Try
25 clicks (Should be 1 complete revolution +140 degees). No
success, set down at 9365' each time.
11 :25 - 12:30 1.08 CASE N DPRB COMP Discuss options. There aren't many. Orient around again,
pumping at a higher rate at each tag. Holding 2.0 bpm each
time we set down to lock orienter. Took 25 clicks again. No
success.
12:30 - 13:45 1.25 CASE N DPRB COMP POH. Call town and discuss plan forward.
13:45 - 14:15 0.50 CASE N DPRB COMP Tag up at surface. Rih down drift run BHA #3. Found bottom
nose scarred all the way around gauge section. Orienter
appears to have worked on last run, and the guide nose shows
the wear.
14:15 - 14:30 0.25 CASE N DPRB COMP Safety meeting prior to cutting coil.
14:30 - 16:15 1.75 CASE N DPRB COMP Cut coil 400' of coil to move wear spot, rehead with Baker CTC.
Pull test CTC to 40k Ibs. PT to 3500 psi.
Contacted AOGCC, Chuck Sheve, and was granted a 24 hour
extension on BOP testing. We will do it tommorrow.
16:15 - 16:30 0.25 CASE N DPRB COMP Safety meeting prior to picking up cleanout BHA.
16:30 -17:30 1.00 CASE N DPRB COMP Pick up BHA #14. BHA; Baker crayola mill, 1.37 deg motor,
MWD, SWS MHA.
17:30 -19:15 1.75 CASE N DPRB COMP RIH with BHA #14. Shallow hole test at 500', MWD worked
properly. RIH. Correct depth at EOP 8,800', -35.4' correction.
19:15 - 00:00 4.75 CLEAN N COMP Tag whipstock at 9,365' w/o pump. PU to 9,360' and bring up
pump to 2.4 bpm. TF came up 174L. Orient to 33L. Pumping
2.7 bpm, 2,850 psi, SO=29.5K. Set down at 9,363'. 50 -100
psi motor work. Reactive torque changed TF to 55L. PU and
orient to 16L. Got a bite at 9,363'. 700 psi pressure increase
and TF went to 121L. PU and shut down pump. Tag
whipstock at 9,364'. Bring up pump to 2.5 bpm. TF came up
22L then flopped to 7L. Set down on whipstock. Motor stalled.
TF 16L. PU. Repeat and motor stalled several times. Mill to
9,364.8'. Motor work dropped off. Able to get down to 9,368'.
Motor stalled. PU to 9,361'. Shut down pump. Set down at
9,370'. Continue milling operations attempting to get through
window.
4/6/2003 00:00 - 01 :00 1.00 CLEAN N DPRB COMP Continue milling operations to 9,369.8' with occasional motor
stalls.
01 :00 - 01 :30 0.50 CLEAN N COMP Orient to HS, 30R, 50R, 50L, 39L, 22L and attempt to work
through window. No go.
01 :30 - 02:00 0.50 CLEAN N COMP Resume milling operations. TF 19L - 28L.
Printed: 4/14/2003 9:29: 11 AM
)
l
)
BP EXPLORATION .
Operations Summary Report
Page 1 0 of 16
Legal Well Name:
Common Well Name:
Event Name:
Contractor Name:
Rig Name:
E-01
E-01
REENTER+COMPLETE
NORDIC CALISTA
NORDIC 1
Start: 3/28/2003
Rig Release:
Rig Number:
Spud Date: 8/16/1975
End:
Date Frorn -To Hours Task Code NPT Phase . Description of Operations
4/6/2003 02:00 - 03:00 1.00 CLEAN N COMP Spring ahead 1 hour due to day light savings time.
03:00 - 04:00 1.00 CLEAN N COMP Mill at HS. Progress increased from 9,370' to 9,371.6'. Milled
over 7' w/o finding old hole.
04:00 - 06:30 2.50 CLEAN N COMP POH to inspect mill and possibly change mill and motor bend.
06:30 - 08:15 1.75 CLEAN N DPRB COMP Change out orienter (leaking oil), Adjust motor bend to 2.83
deg. (Same bend that build section was drilled at). MU used
Hughes D0261 , Baker string reamer, 2.83 deg motor.
MWD-GR.
08: 15 - 09:55 1.67 CLEAN N DPRB COMP RIH with BHA #15. Make -36' correction at flag. Continue RIH.
09:55 - 10:15 0.33 CLEAN N DPRB COMP Log tie in pass over top of sag river at 9220'. Make +6'
correction to get on depth to original well bore.
10:15 - 10:50 0.58 STWHIP N DPRB WEXIT RIH dry. Tag up at 9377' dry. PU, bring on pumps. TF=13L.
PUH to 9350', RIH, hung up at 9369.5', and we got erratic tool
faces from 0 to 45R. Free spin 2780 psi at 2.5 bpm. Tag up at
9369', mill ahead at 25L tool face. (This whipstock was set at
28L originally).
10:50 - 12:00 1.17 STWHIP N DPRB WEXIT SD pumps, PU to 9350', and RIH dry to see which window we
can find. Tag up at 9370'. PU try it again. Tag up pumping at
9369.4', mill ahead. Fell thru something. Tag up again at
9375.5', mill ahead.
11:10,9375.6', TF=20L
11 :30, 9376.4, TF=4L
11 :40, 9377.1', TF31 L, and getting errattic.
Drilling break, making 30 fph. Appear to be drilling sand. PU,
RIH dry. Tag up at 9375.1' several times. Kick pumps back
on.
11 :45, 9374.1', TF19R. Now tagging up -3' than we were
before. Getting hard drilling, and looks like we are drilling steel.
How did we lose hole, and go from formation to steel?
Whipstock moving on us?
12:00 - 12:30 0.50 STWHIP N DPRB WEXIT MWD has played back all GR curves from all trips in the hole.
There is a definate shift in the Whipstock pip tag between the
last build section BHA on 4-2 at 18:30, and the first lateral
section BHA tie in on 4-3 at 10:30. The GR pip tag is on depth
until the first lateral section run, and then was found 6' deeper
than it was set. (Note, the second whipstock was set 5' above
the first whipstock, it could have fallen about 5').
12:30 -14:15 1.75 STWHIP N DPRB WEXIT We are convinced that the whipstock has fallen down the hole,
and is probably no longer locked in place. It seems to move
around when we mill on it. No need to continue. POH. Re
paint flag at 8800. Note that the tied in flag depth is actually
8805'. Call town to discuss plan forward.
14:15-15:00 0.75 STWHIP N DPRB WEXIT Tag up at surface. Rig down BHA. Discussion with town is to
re drill the section.
15:00 - 21 :00 6.00 BOPSURC PRE Weekly BOP test. Witness of test waived by AOGCC, Chuck
Sheve.
21:00 - 23:15 2.25 STWHIP X WEXIT Wait on SWS eline crew.
23: 15 - 00:00 0.75 STWHIP C WEXIT PJSM for RU wireline and MU whipstock.
4/7/2003 00:00 - 00:30 0.50 STWHIP N DPRB WEXIT PU eline tools and RU eline.
00:30 - 01 :30 1.00 STWHIP N DPRB WEXIT Trouble shoot eline tools.
01 :30 - 02:00 0.50 STWHIP N DPRB WEXIT MU whipstock to wireline.
02:00 - 06:30 4.50 STWHIP N DPRB WEXIT RIH w/ whipstock on wireline. Tie in. Set whipstock 1.5
Printed: 4/14/2003 9:29:11 AM
)
)
Legal Well Name:
Common Well Name:
Event Name:
Contractor Name:
Rig Name:
Date
BP EXPLORATION
o peratio ns5 urn l1'IaryRe port
E-01
E-01
REENTER+COMPLETE
NORDIC CALISTA
NORDIC 1
4/7/2003
02:00 - 06:30
From - To Hours Task Code NPT Phase
DPRB WEXIT
06:30 - 07:00
07:00 - 07:15
07:15 - 08:50
08:50 - 09: 15
09: 15 - 09:40
09:40 - 10:00
10:00 - 10:30
10:30 - 11 :00
11 :00 - 11 :30
11 :30 - 13:40
13:40 - 14:15
14:15 -14:30
14:30 -15:00
15:00 - 16:00
16:00 - 16:20
16:20 - 16:45
16:45 -18:15
18:15 - 00:00
4/8/2003
00:00 - 02:30
4.50 STWHIP N
0.50 STWHIP N
0.25 STWHIP N
1.58 STWHIP N
0.42 STWHIP N
0.42 STWHIP N
0.33 STWHIP N
0.50 STWHIP N
0.50 STWHIP N
0.50 STWHIP N
2.17 STWHIP N
0.58 STWHIP N
0.25 STWHIP N
0.50 STWHIP N
1.00 STWHIP N
0.33 STWHIP N
0.42 STWHIP N
1.50 STWHIP N
5.75 STWHIP N
2.50 STWHIP N
DPRB WEXIT
DPRB WEXIT
DPRB WEXIT
DPRB WEXIT
DPRB WEXIT
DPRB WEXIT
DPRB WEXIT
DPRB WEXIT
DPRB WEXIT
DPRB WEXIT
DPRB WEXIT
DPRB WEXIT
DPRB WEXIT
DPRB WEXIT
DPRB WEXIT
DPRB WEXIT
DPRB WEXIT
DPRB WEXIT
DPRB WEXIT
Page 11 of 16
Start: 3/28/2003
Rig Release:
Rig Number:
Spud Date: 8/16/1975
End:
Description of Operations
degrees Left of HS. Top of whipstock at 9,250'. POH. RD
wireline
PJSM for today's activities.
PU nozzle BHA.
RIH with nozzle assembly, BHA #16. Make -29' correction at
flag (typical for this well). RIH easy thru packer at 8998'. Tag
up lightly on pinch point of whipstock at 9258' CTM (Should be
9255 ' based on ELM). Only set 1000 Ibs on WS prior to
picking up. PUH 10', flag coil at 9248', circ at min rate.
Safety meeting with rig crew, cementers, veco, Co Reg. Also
have 3 extra individuals on location. Baker hand and 2 coms
techs. Un necessary personnel are advised to remain clear of
cementing operations and hi pressure areas.
Prime up cementers and take on rig water.
Pump 4 bbls to warm lines. PT cementers hard lines to 4000
psi. Line up down coil come on lines with cement. Pump 35
bbls of class G cement at 15.8 ppg, 2 bpm 3200 psi. Chase
with 10 bbl spacer of fresh water. Swap to rig pumps.
Line up down the coil with biozan. Displace cement to nozzle
with bio, taking returns. Pump 1 bbl, SI returns. Bullhead
cement from this point. Got good WHP to 2400 psi. Put 20
bbls down hole. Opened the choke, layed in the remaining 15
bbls of cement. PUH to safety depth at 8600'. Drop pump
rate to 0.2 bpm. Estimated good cement to at least 9730' MD
in old wellbore. Which covers all of build section with cement.
CIP at 10:30. Drop 0.8125" ball. Ball set in nozzle is 0.625".
Launch ball. Confirm ball away. RIH pumping in biozan to
contaminating cement. Clean out to flag at 9248', leave 10' of
cement on top of whipstock. Jet at flag for 8 bbls. Land ball on
seat in nozzle, POH jetting with JSN.
Washing up cement, pumping 3 bpm, pulling at 80%. PUH to
packer, then run back in to flag.
POH at 65 fpm, pumping at 3.8 bpm.
Safety meeting re pumping, new Veco drivers, spill prevention,
etc., rig down proceedure.
Stand back injector, lay down cementing nozzle. Recovered
ball.
Wash tree with swizzle stick nozzle.
Bring 150 bbls of mud onto rig. Also have dirty vac cleaning
up returns tank. Hold off on making up next BHA until fluid
transfers are done. Don't want to overload new driller and 2
new Veco vac truck drivers.
Safety meeing prior to picking up BHA.
Make up BHA #17.
RIH BHA #17, Hughes D0261 window mil, Hughes string mill,
Baker Xtreme motor, Baker MHA, 2 jts PH6, Baker checks,
Baker CTC.
Cement at 1400 psi compressive strength at 18:30.
Make -29' correction. Kick on pumps. Free spin 2.7
bpm=1880 psi. Mill window to 9,262.3'.
Mill window and 10' of formation to 9,273' uncorrected depth.
Top of window 9,255', bottom of window 9,261' uncorrected.
Printed: 4/14/2003 9:29:11 AM
)
)
BP EXPLORATION
Operations Summary Rep.ort
Page 12 of 16
Legal Well Name:
Common Well Name:
Event Name:
Contractor Name:
Rig Name:
E-01
E-01
REENTER+COMPLETE
NORDIC CALISTA
NORDIC 1
Start: 3/28/2003
Rig Release:
Rig Number:
Spud Date: 8/16/1975
End:
Date From -To Hours ·Task Code NPT Phase Description of Operations
4/8/2003 02:30 - 04:00 1.50 STWHIP N DPRB WEXIT Ream through window. Run through window w/o pump.
Window in good condition.
04:00 - 07: 15 3.25 STWHIP N DPRB WEXIT Displace to new flo pro mud and continue to ream window until
mud gets to mill. POH displacing to new mud.
07:15 - 07:30 0.25 STWHIP N DPRB WEXIT Tag up at surface. Lay down BHA #17. Both mills guage
3.79". We appear to have a good window. Finish laying down
window milling BHA.
07:30 - 07:45 0.25 DRILL N DPRB PROD1 Safety meeting prior to picking up BHA.
07:45 - 09:00 1.25 DRILL N PROD1 BHA Makeup for first build section BHA.
09:00 - 10:50 1.83 DRILL N DPRB PROD1 RIH with first build section BHA. Hycalog bi centered bit, 1.04
motor, MWD-GR.
Shallow hole test of orienter and MWD worked fine. Run thru
window slick with pumps down. Tag bottom, make -34
correction.
10:50 - 11 :55 1.08 DRILL N DPRB PROD1 Kick pumps on. Pit vol=254 bbls. Free spin 2600 psi at 2.5
bpm. TF comes up at 38R. Try pushing on it to bring TF to
high side. Getting 60 fph. Pit vol=312 bbls.
11 :55 - 12:20 0.42 DRILL N DPRB PROD1 9301', Orient around to high side.
12:20 - 14:45 2.42 DRILL N DPRB PROD1 Resume drilling.
14:45 - 14:50 0.08 DRILL N DPRB PROD1 9320', pick up for a click. Pit vol=290 bbls.
14:50 - 16:45 1.92 DRILL N DPRB PROD1 Resume drilling. Slow ROP in Shublik. Drill to 9375'.
16:45 - 18:20 1.58 DRILL N DPRB PROD1 Drill to 9450' with 1 OL-HS TF, 2.8/2.8bpm, 2900/3200psi, 55fph
ave ROP. P/U btm & shoot survey.
18:20 - 18:40 0.33 DRILL N DPRB PROD1 Wiper trip to window.
18:40 -19:10 0.50 DRILL N DPRB PROD1 Drill ahead to 9,475' at 2.8 bpm /2,900 psi on bottom, TF 20L.
19:10 - 21 :00 1.83 DRILL N DPRB PROD1 POH to change bend on motor.
21 :00 - 22:15 1.25 DRILL N DPRB PROD1 PJSM. Change bend on motor to 2.57 degrees. Change MHA.
Pull and PT coil connector.
22:15 - 00:00 1.75 DRILL N DPRB PROD1 RIH.
4/9/2003 00:00 - 00:30 0.50 DRILL N DPRB PROD1 RIH to window. Set down w/o pumps. PU and orient to 30L.
RIH past window w/o pumps.
00:30 - 01 :10 0.67 DRILL N DPRB PROD1 Tie in. -37' correction.
01:10 - 01:20 0.17 DRILL N DPRB PROD1 Orient to 40L.
01 :20 - 01 :50 0.50 DRILL N DPRB PROD1 Drill at 2.8 bpm, 2,775 psi off bottom, 3,100 psi on bottom. TF
70 - 40L. Ratty drilling getting started with new bit and bigger
bend motor.
01 :50 - 02:10 0.33 DRILL N DPRB PROD1 Orient to 80L.
02:10 - 04:45 2.58 DRILL N DPRB PROD1 Drill at 2.8 bpm, 2,775 psi off bottom, 2,900 psi on bottom. TF
70 - 80L. Tough drilling in zone 3, slow progress. Drill to
9,518'. Bit quit.
04:45 - 06:30 1.75 DRILL N DPRB PROD1 POH to change bit.
06:30 - 07:15 0.75 DRILL N DPRB PROD1 OOH. PJSM. B/O bit & SIB BHA. Bit grades 8,5,1 with a badly
ringed pilot nose.
07: 15 - 07:45 0.50 DRILL N DPRB PROD1 PJSM. Rehead & M/U OS CTC. Pull/Press test - OK. M/U
build section BHA #20 with 2.57deg bend motor, MWD & new
Hycalog OS 100 3-3/4" x 4-1/4" bicenter bit. M/U injector.
07:45 - 09:30 1.75 DRILL N DPRB PROD1 RIH with BHA #20. SID pumps & smoothly run thru window.
Continue RIH & tagged TO @ 9552'. Correct depth to 9516'.
Check TF - @ 100L.
09:30 - 09:50 0.33 DRILL N DPRB PROD1 Orient TF to 90L.
09:50 - 10:10 0.33 DRILL N DPRB PROD1 Drill to 9526' with 70-80L TF, 2.5/2.5bpm, 2450/2850psi, 30fph
ave ROP.
10:10 -11:05 0.92 DRILL N DPRB PROD1 Orient & drill to 9551' with 60-70L TF, 2.5/2.5bpm,
Printed: 4/14/2003 9:29: 11 AM
)
)
BP ·EXPLORA TION
Operations Summary Report
Page 13 of16
Legal Well Name:
Common Well Name:
Event Name:
Contractor Name:
Rig Name:
E-01
E-01
REENTER+COMPLETE
NORDIC CALISTA
NORDIC 1
Start: 3/28/2003
Rig Release:
Rig Number:
Spud Date: 8/16/1975
End:
Date From - To Hours Task· Code NPT Phase Description of Operations
4/9/2003 10:10-11:05 0.92 DRILL N DPRB PROD1 2550/2900psi, 27fph ave ROP.
11:05-11:10 0.08 DRILL N DPRB PROD1 Orient TF to 37L.
11: 1 0 - 11 :25 0.25 DRILL N DPRB PROD1 Drill to 9562' with 55L TF, 2.5/2.5bpm, 2550/2900psi, 44fph ave
ROP. Seems like we've drilled out of zone 3 @ +/-9562'.
11 :25 - 11 :40 0.25 DRILL N DPRB PROD1 Short 100' wiper & orient TF to 22L.
11:40-12:10 0.50 DRILL N DPRB PROD1 Drill to 9581' with 50L TF, 2.5/2.5bpm, 2550/2900psi, 40fph ave
ROP. Getting 31degs DLS & turning more than planned. Will
need to steer to the right to counter left turn.
12:10 - 12:30 0.33 DRILL N DPRB PROD1 Short 100' wiper & orient TF to 90R.
12:30 - 13:15 0.75 DRILL N DPRB PROD1 Drill to 9610' with 70R TF, 2.5/2.5bpm, 2600/2950psi, 70fph
ave ROP.
13:15 -13:30 0.25 DRILL N DPRB PROD1 Shoot off-btm surveys.
13:30 - 14:40 1.17 DRILL N DPRB PROD1 Short 100' wiper & orient TF around to 65L - TF roll over to
40R. Reorient 2x to 10L. Pulling to 9475' above hi DLS area to
get clicks.
14:40 - 16:45 2.08 DRILL N DPRB PROD1 Drill to 9750' with 20-30L TF, 2.5/2.5bpm, 2600/2950psi, 85fph
ave ROP.
16:45 - 17:05 0.33 DRILL N DPRB PROD1 Wiper trip clean to window.
17:05 - 17:25 0.33 DRILL N DPRB PROD1 Log GR & tie-into RA Pip tag - +3.5' CTD correction.
17:25 - 17:45 0.33 DRILL N DPRB PROD1 RBIH.
17:45 - 19:10 1.42 DRILL N DPRB PROD1 Orient & reorient 2x TF to 80L. Having to pull up hole to orient.
19:10 - 19:45 0.58 DRILL N DPRB PROD1 Drill to 9800' with 95L TF.
19:45 - 21 :40 1.92 DRILL N DPRB PROD1 POH to change motor and bit.
21:40 - 23:10 1.50 DRILL N DPRB PROD1 PJSM. Change out MWD probe, motor, and bit.
23:10 - 00:00 0.83 DRILL N DPRB PROD1 RIH. Hold after action review for changing BHA.
4/10/2003 00:00 - 01 :10 1.17 DRILL N DPRB PROD1 RIH. Run through window w/o pumps no problem. Tag
bottom. Correct depth -4'.
01 :10 - 01 :25 0.25 DRILL N DPRB PROD1 Orient to 90L.
01 :25 - 03:30 2.08 DRILL N DPRB PROD1 Drilling to 9,900' at 90L. Orient to 90R and drill to 9,950'.
03:30 - 04:10 0.67 DRILL N DPRB PROD1 Wiper trip to window. Hole in good condition.
04:10 - 06:30 2.33 DRILL N DPRB PROD1 Drill to 10088' with 2.8 bpm, 3,000 psi on btm, 2,800 psi off
btm, TF 90L, ROP 50 - 100 fph.
06:30 - 07:00 0.50 DRILL N DPRB PROD1 Drill to 10113' with 70L TF, 2.7/2.7bpm, 2700/3000psi, 50fph
ave ROP. Achieving very poor turn rate - require a minimum of
12degs/1 OOft turn rate. Decide to POOH to reset the motor
bend to 1.37degs.
07:00 - 09:00 2.00 DRILL N DPRB PROD1 POOH to reset motor bend.
09:00 - 09:45 0.75 DRILL N DPRB PROD1 OOH. B/O bit & SIB BHA. Bit grades 8,5,1 with a badly ringed
pilot nose - no wonder we couldn't achieve desired turn.
Meanwhile held ASA observations.
09:45 - 10:00 0.25 DRILL N DPRB PROD1 Held PJSM & discussed among other things recent incidents,
AARs, any way we could improve our working procedures.
10:00 - 10:30 0.50 DRILL N DPRB PROD1 PJSM. Reset motor bend to 1.37deg. M/U new Security DBS
3-3/4" FM2533R bit. M/U MWD & injector.
10:30 - 12:45 2.25 DRILL N DPRB PROD1 RIH with BHA #22. SID pumps & run smoothly thru window.
Continue RIH & tagged TD @ 10153'. Correct depth to 10113'.
Check TF - @ 100R.
12:45 -12:55 0.17 DRILL N DPRB PROD1 Orient TF to 70L.
12:55 - 13:30 0.58 DRILL N DPRB PROD1 Drill to 10166' with 70-80L TF, 2.7/2.7bpm, 2750/2850psi,
120fph ave ROP.
13:30 - 13:45 0.25 DRILL N DPRB PROD1 Orient TF to 90L.
13:45 - 14:30 0.75 DRILL N DPRB PROD1 Drill to 10255' with 90L TF, 2.7/2.7bpm, 2750/2950psi, 130fph
ave ROP.
Printed: 4/14/2003 9:29: 11 AM
") )
BP EXPLORATION
Operations Summary Report
Legal Well Name: E-01
Common Well Name: E-01 Spud Date: 8/16/1975
Event Name: REENTER+COMPLETE Start: 3/28/2003 End:
Contractor Name: NORDIC CALISTA Rig Release:
Rig Name: NORDIC 1 Rig Number:
Date From - To Hours Task Code NPT Phase Description of Operations
4/10/2003 14:30 - 15:25 0.92 DRILL N DPRB PROD1 Wiper trip clean to window. RBIH.
15:25 - 16:00 0.58 DRILL N DPRB PROD1 Drill to 10300' with 90-100L TF, 2.7/2.7bpm, 2650/2850psi,
90fph ave ROP.
16:00 - 16:30 0.50 DRILL N DPRB PROD1 Drill to 10344' with 100L TF, 2.7/2.7bpm, 2650/3000psi, 60fph
ave ROP.
16:30 - 17:50 1.33 DRILL N DPRB PROD1 Orient & drill to 10383' with 70L TF, 2.7/2.7bpm, 2650/3000psi,
60fph ave ROP.
17:50 - 18:00 0.17 DRILL N DPRB PROD1 Orient & drill to 10400' with SOL TF, 2.7/2.7bpm, 2750/3100psi,
100fph ave ROP.
18:00 - 19:25 1.42 DRILL N DPRB PROD1 Wiper trip to window. Tie in to RA tag. Correct +2.5'.
19:25 - 22:40 3.25 DRILL N DPRB PROD1 Drill to 10,565' at 2.7 bpm, 2,750 psi off /2,950 psi on bottom,
TF 65R, ROP 150 fph. Drilling slowed down at 10,534'.
22:40 - 23:50 1.17 DRILL N DPRB PROD1 Wiper trip to window. Hole in good condition.
23:50 - 00:00 0.17 DRILL N DPRB PROD1 Orient.
4/11/2003 00:00 - 02:00 2.00 DRILL N DPRB PROD1 Drill ahead at 2.7/2.7 bpm 2,950/3,150 psi. Break out of
shale. Drill to 10,659' at 80 - 90 R, 80 - 100 fph. TF dropping.
02:00 - 02: 15 0.25 DRILL N DPRB PROD1 Orient to 119R.
02: 15 - 04:00 1.75 DRILL N DPRB PROD1 Drill ahead to TD at 10,735'. 2.7/2.7 bpm 2,950/3,150 psi,
120 R, 60 - 100 fph.
04:00 - 04:20 0.33 DRILL N DPRB PROD1 PU and tag bottom. Survey.
04:20 - 06:45 2.42 DRILL N DPRB PROD1 Wiper trip to window. Unable to tie in due to MWD sporadic
pulsing. RBIH pump down 50bbls of fresh flopro mud. Tag TD
@ 10737'.
06:45 - 09:30 2.75 DRILL N DPRB PROD1 POOH laying in fresh mud in open hole. Paint EOP flags @
7400' & 8900'.
09:30 - 10:30 1.00 DRILL N DPRB PROD1 OOH. PJSM. LlO drilling BHA #22. Bit grades 2,2,1.
10:30 - 10:45 0.25 CASE P COMP R/U to run liner. Drift LSL sub with 2.347" drift & tie-off excess
tubulars.
10:45 -11 :00 0.25 CASE P COMP PJSM for running liner.
11 :00 - 13:30 2.50 CASE P COMP M/U 27 jts 2-7/8" 6.16# L-80 STL, 26 jts 3-3/16" 6.2# L-80 TCII
& 2 jts 3-1/2" 8.81# L-80 STL liners with cementralizers, float
equipment, pup jts, LSL sub, X/Os & 'X' nipple. M/U Baker
CTLRT.
13:30 - 15:00 1.50 CASE P COMP Install Baker CTC. Pull/pressure test - OK. Load wiper dart,
launch & check. Chase dart with mud & pig CT. Dart bumped
on catcher @ 54.5bbls.
15:00 - 16:45 1.75 CASE P COMP RIH with liner on CT. See flag @ 9234.4'. Correct (-37.4') to
9197'. Check up wt - 49k, down wt - 30.5k. RIH smoothly @
50fpm thru window. Stack out @ 10025'. Check & confirm that
the fluted scoop head is hanging up on the 7" BOT Pkr/PBR
assy. Discuss with ANC & decide to POOH to run a 4-5/8" OD
scoop head.
16:45 - 18:20 1.58 CASE N DPRB COMP POOH liner assembly.
18:20 - 21 :30 3.17 CASE N DPRB COMP Wait on 4 5/8" scoop head.
21 :30 - 23:30 2.00 CASE N DPRB COMP MU scoop head. Stab injector. RIH. Ratty last 50'. Tag
bottom. PU and confirm. PU=51 K.
23:30 - 00:00 0.50 CASE P COMP Drop 5/8" steel ball to release CTLRT. Pump down ball at 2.5
bpm. Slow pump down to .5 bpm at 42 bbls.
4/12/2003 00:00 - 00:20 0.33 CASE P COMP Circulate ball on seat. Pressure up to 3,700 psi to release
CTLRT. PU to verify liner is released. PU=38K.
00:20 - 00:40 0.33 CASE P COMP Circulate. Clean pits for displacement.
00:40 - 03:20 2.67 CASE P COMP Displace well to 2% KCI at 3.5 bpm, 3033 psi.
03:20 - 04:30 1.17 CAS E N WAIT COMP Wait on 200 bbls 2% KCI prior to starting cement job.
Printed: 4/14/2003 9:29: 11 AM
')
)
EXPLORATION
Operations. Sum.mary. Report
Legal Well Name:
Common Well Name:
Event Name:
Contractor Name:
Rig Name:
E-01
E-01
REENTER+COMPLETE
NORDIC CALISTA
NORDIC 1
Start: 3/28/2003
Rig Release:
Rig Number:
Spud Date: 8/16/1975
End:
Date From - To Hours Task Code NPT Phase Descri ption· of Operations
4/12/2003 04:30 - 05:00 0.50 CASE P COMP Take on KCI.
05:00 - 05:20 0.33 CASE P COMP PJSM for cementing.
05:20 - 06: 1 0 0.83 CASE P COMP Batch mix cement. Mix biozan pill.
06:10 - 06:40 0.50 CEMT P COMP Pump 5 bbls of water. Pressure test lines to 4,000 psi. Pump
19 bbls of 15.8 ppg class G gas block cement. Shut down and
SI reel valve. Wash up cement lines. Drop wiper dart. Pump
0.2 bbls. Shut down and verify dart left. Displace with biozan
and KCI water.
06:40 - 07:05 0.42 CEMT P COMP Displace cmt @ 2.7/2.2bpm & 1300psi. Slow down to 2bpm @
52bbls. CTWP latch up LWP @ 54.8bbls. Shear LWP @
3400psi. Continue displacing slowing down to 0.5bpm @
64bbls. Bump LWP @ 66.5bbls & pressure up to 1000psi over.
Had 17.8bbls cmt around shoe. Bleed of CT pressure & floats
held. Pressure back CT to 500psi & unsting @ 38k. Good
cement job! CIP at 07:00 Hrs.
07:05 - 09:00 1.92 CEMT P COMP POOH @ 75fpm replacing voidage with bio KCL water @
O.4bpm.
09:00 - 10:00 1.00 CEMT P COMP LD CTLRT.
10:00 - 10:15 0.25 EVAL P COMP PJSM on P/U 1-1/4" CHS tbg, CNL tools & motor/mill.
10:15 - 12:00 1.75 EVAL P COMP P/U logging/cleanout BHA #24 (1841.18') with 2.3" mill on
2-1/8" motor, CNLlCCLlGR logging tool carrier & 58 jts of
1-1/4" CSH tbg. M/U injector.
12:00 - 13:15 1.25 EVAL P COMP RIH BHA#7 on CT to 8800'. Phase-1 driving conditions with
33mph winds, 44mph gusts & heavy snow drifting.
13:15 - 14:10 0.92 EVAL P COMP Log down @ 60fpm from 8800' to PDB tagged @ 10735'. Circ
out 150k cps flo-pro perf pill.
14:10- 14:40 0.50 EVAL P COMP Log up @ 60fpm from PBD to 8800'.
14:40 - 16:15 1.58 EVAL P COMP POOH from 8800'.
16:15 - 16:45 0.50 EVAL P COMP Pop off & drop 5/8" ball to open circ. sub.
16:45 - 18:00 1.25 EVAL P COMP PJSM. SIB 18 stands of 1-1/4" CSH & LID 22 singles.
18:00 - 18:15 0.25 EVAL P COMP Crew change & PJSM on LID logging tools & motor/mill. SWS
perf gun van stuck in snow drift - send rig loader to pull it out.
Compressive strength of cement as @ 18:00 Hrs - 2200psi.
18:15 - 18:45 0.50 EVAL P COMP LID CNLlCCLlGR logging tools & motor/mill.
18:45 - 19:30 0.75 CEMT P COMP Line up to test liner lap. Fill hole with KCL. WH/IAlOA @
80/-15/-15 psi @ onset of test. Staged up WH/IAlOA to
2138/-12/-15 psi. After 34m ins we have WH/IAlOA @
2109/-12/-15 psi. Good test!
19:30-21:15 1.75 EVAL P COMP Download MCNL/CCL/GR data & fax to ANC geologist. PJSM
for PU perf guns. Confirm perforation intervals with ANC
geologist.
21 :15 - 22:45 1.50 PERF P COMP PU Schlumberger 2" PJ perf guns.
22:45 - 23:30 0.75 PERF P COMP RIH w/ 1 1/4 CS HYD from derrick.
23:30 - 23:40 0.17 PERF P COMP Stab injector.
23:40 - 00:00 0.33 PERF P COMP RIH.
4/13/2003 00:00 - 01:10 1.17 PERF P COMP RIH w/ perf guns.
01:10 - 01:30 0.33 PERF P COMP Tag bottom. PU=44.5K. Place guns on depth.
01 :30 - 02:10 0.67 PERF P COMP Pump 25 bbl perf pill. Drop 5/8" aluminum ball. Pump 5 bbl
perf pill. Pump ball down with KCI.
02:10 - 02:15 0.08 PERF P COMP Ball on seat. Pressure up to 3,100 psi and guns fired.
Perforation intervals (SWS 2" PJ, 4SPF):
10,000' - 10,200'
10,350' -10,510'
Printed: 4/14/2003 9:29: 11 AM
)
)
Page 16 of 16
BP EXPLORATION
Operations Summary Report
Legal Well Name:
Common Well Name:
Event Name:
Contractor Name:
Rig Name:
Date
4/13/2003
E-01
E-01
REENTER+COMPLETE
NORDIC CALISTA
NORDIC 1
From - To Hours Task Code NPT Phase
02:10 - 02:15 0.08 PERF P COMP
02:15 - 04:15 2.00 PERF P COMP
04:15 - 06:30 2.25 PERF P COMP
06:30 - 06:45 0.25 PERF P COMP
06:45 - 09:20 2.58 PERF P COMP
09:20 - 10:25 1.08 WHSUR P COMP
10:25 - 11 :00 0.58 WHSUR P COMP
11 :00 - 11: 10 0.17 WHSUR P COMP
11:10-11:25 0.25 RIGD P POST
11 :25 - 12:30 1.08 RIGD P POST
12:30 - 12:45 0.25 RIGD P POST
12:45 - 13:30 0.75 RIGD P POST
13:30 - 15:00 1.50 RIGD P POST
Start: 3/28/2003
Rig Release:
Rig Number:
Spud Date: 8/16/1975
End:
Descri ption of· Operations
10,570' - 10,690'
Pipe moving freely. No losses. POH.
Stand back injector. LD 1 1/4" CSH.
Held PJSM for LID perf guns.
LID perf guns. ASF! Load out perf guns.
RIH with nozzle assy to 2200'.
POOH freeze protecting with MeOH. SI swab (33 turns).
OOH. LID nozzle assy.
PJSM for blowing down CT with N2.
PT hardlines. Blow down CT with N2 & bleed down.
PJSM for unstabing CT & RID injector gooseneck.
Unstab coil & remove injector gooseneck. Store injector in
stabbing box. Meanwhile clean rig pits.
PJSM. N/D BOPE. N/U & pressure test tree cap. Rig released
@ 15:00 on 4/13/2003. Rig Accept to Rig Release Time = 15
Days & 21.5 Hrs. Prepare for derrick down rig move to NK-62A.
Printed: 4/14/2003 9:29:11 AM
)
}
~D3-œ S
22-Apr-03
AOGCC
333 W. 7th Ave. Suite 100
Anchorage, AK 99501
Re: Distribution of Survey Data for Well E-01A
Dear Dear Sir/Madam:
Enclosed are two survey hard copies and 1 disk
Tie-on Survey: 9,200.00' MD
Window / Kickoff Survey: 9,250.00' MD (if applicable)
Projected Survey: 10,737.00' MD
Please call me at 273-3545 if you have any questions or concerns.
Regards,
William T. Allen
Survey Manager
RECE\VED
APR 2 9 2003
Attachment(s)
Alaska Qtj & Gas Cons. commission
Anchorage
Sperry-Sun Drilling Services
North Slope Alaska
BPXA
PBU_WOA E Pad
E-01A
"-'
Job No. AKMW0002365920, Surveyed: 11 April, 2003
Survey Report
21 April, 2003
Your Ref: API 500292016601
Surface Coordinates: 5975811.00 N, 664471.00 E (70° 20' 24.7789" N, 148°"39' 54.9506" W)
Grid Coordinate System: NAD27 Alaska State Planes, Zone 4
-.-v"
Surface Coordinates relative to Project H Reference: 975811.00 N, 164471.00 E (Grid)
Surface Coordinates relative to Structure Reference: 2605.96 N, 1989.67 E (True)
Kelly Bushing: 55.00ft above Mean Sea Level
Elevation relative to Project V Reference: 55.00ft
Elevation relative to Structure Reference: 55.00ft
speI'I'Y-su,!
DRILLING seRVIc:es
A Halliburton Company
Survey Ref: 5vy4006
Sperry-Sun Drilling Services
Survey Report for PBU_WOA E Pad - E-01A
Your Ref: AP/500292016601
Job No. AKMW0002365920, Surveyed: 11 April, 2003
BPXA
North Slope Alaska
Measured Sub-Sea Vertical Local Coordinates Global Coordinates Dogleg Vertical
Depth Incl. Azim. Depth Depth Northings Eastings Northings Eastings Rate Section Comment
(ft) (ft) (ft) (ft) (ft) (ft) (ft) (0/100ft)
9200.00 23.550 87.840 8621 .15 8676.15 1568.11 N 1812.32 E 5977418.49 N 666248.49 E 1007.82 Tie-On Point
MWD Magnetic
9250.00 23.210 88.050 8667.04 8722.04 1568.82 N 1832.15 E 5977419.64 N 666268.29 E 0.700 1003.04 Window Point
9272.12 24.320 87.890 8687.29 8742.29 1569.14 N 1841.06 E 5977420.15 N 666277.19 E 5.027 1000.89
9308.50 28.020 87.660 8719.93 8774.93 1569.76 N 1857.09 E 5977421.12 N 666293.21 E 10.174 997.07
9339.54 30.480 87.500 8747.01 8802.01 1570.41 N 1872.24 E 5977422.10 N 666308.34 E 7.929 993.51
~
9375.32 33.220 87.340 8777.40 8832.40 1571.26 N 1891.10 E 5977423.36 N 666327.18 E 7.662 989.13
9401.84 35.770 87.240 8799.26 8854.26 1571.97 N 1906.10 E 5977424.40 N 666342.16 E 9.618 985.68
9428.72 38.200 87.150 8820.73 8875.73 1572.76 N 1922.25 E 5977425.55 N 666358.29 E 9.042 981.99
9452.50 39.820 85.850 8839.20 8894.20 1573.68 N 1937.19 E 5977426.79 N 666373.20 E 7.632 978.75
9479.22 42.560 79.510 8859.32 8914.32 1575.94 N 1954.62 E 5977429.44 N 666390.58 E 18.680 976.13
9509.04 43.000 60.830 8881.30 8936.30 1582.76 N 1973.49 E 5977436.67 N 666409.30 E 42.469 977.48
9538.27 44.370 48.760 8902.47 8957.4 7 1594.38 N 1989.91 E 5977448.65 N 666425.46 E 28.873 984.12
9571.72 48.630 33.700 8925.56 8980.56 1612.59 N 2005.72 E 5977467.20 N 666440.87 E 34.986 997.27
9601.92 52.420 43.920 8944.79 8999.79 1630.68 N 2020.34 E 5977485.60 N 666455.08 E 28.955 1010.63
9643.52 61.060 34.400 8967.62 9022.62 1657.66 N 2042.13 E 5977513.06 N 6664 76.28 E 28.208 1030.56
9668.37 67.310 31.400 8978.43 9033.43 1676.44 N 2054.26 E 5977532.10 N 666487.99 E 27.395 1045.27
9696.39 75.420 27.180 8987.38 9042.38 1699.58 N 2067.22 E 5977555.52 N 666500.44 E 32.263 1063.94
9744.25 89.430 14.660 8993.70 9048.70 1743.73 N 2084.00 E 5977600.02 N 666516.25 E 39.061 1101.75
9779.50 90.030 1 .400 8993.87 9048.87 1778.55 N 2088.92 E 5977634.95 N 666520.40 E 37.655 1133.87
9810.06 90.040 357.570 8993.85 9048.85 1809.11 N 2088.64 E 5977665.49 N 666519.45 E 12.533 1163.32
9841.06 88.990 351.230 8994.11 9049.11 1839.94 N 2085.62 E 5977696.25 N 666515.75 E 20.729 1193.79
9877.93 90.930 351.930 8994.14 9049.14 1876.41 N 2080.22 E 5977732.59 N 666509.56 E 5.594 1230.34
9926.01 90.310 356.690 8993.62 9048.62 1924.24 N 2075.45 E 5977780.30 N 666503.74 E 9.983 1277.62 J
-
9954.31 89.520 353.340 8993.66 9048.66 1952.43 N 2073.00 E 5977808.43 N 666500.67 E 12.162 1305.40
9982.96 88.240 353.930 8994.22 9049.22 1980.90 N 2069.82 E 5977836.82 N 666496.87 E 4.919 1333.64
10012.40 89.160 346.120 8994.89 9049.89 2009.86 N 2064.72 E 5977865.67 N 666491.14 E 26.705 1362.89
10047.30 88.460 343.470 8995.61 9050.61 2043.53 N 2055.57 E 5977899.13 N 666481.25 E 7.852 1397.77
10077.70 87.930 342.950 8996.57 9051.57 2072.62 N 2046.80 E 5977928.02 N 666471.84 E 2.442 1428.15
10107.30 90.130 335.020 8997.07 9052.07 2100.22 N 2036.19 E 5977955.38 N 666460.63 E 27.797 1457.61
1 0141 .90 91.450 330.570 8996.60 9051.60 2130.98 N 2020.38 E 5977985.79 N 666444.15 E 13.414 1491.54
21 April, 2003 - 13:53
Page 2 0'4
Dri/lQuest 3.03.02.005
Sperry-Sun Drilling Services
Survey Report for PBU_WOA E Pad M EM01A
Your Ref: AP/500292016601
Job No. AKMW0002365920, Surveyed: 11 April, 2003
BPXA
North Slope Alaska
Measured Sub-Sea Vertical Local Coordinates Global Coordinates Dogleg Vertical
Depth Incl. Azim. Depth Depth Northings Eastings Northings Eastings Rate Section Comment
(ft) (ft) (ft) (ft) (ft) (ft) (ft) (O/100ft)
10164.70 92.160 329.200 8995.88 9050.88 2150.69 N 2008.95 E 5978005.24 N 666432.29 E 6.765 1513.64
10192.70 91.630 323.030 8994.95 9049.95 2173.91 N 1993.35 E 5978028.12 N 666416.18 E 22.105 1540.26
10236.10 91.370 318.100 8993.81 9048.81 2207.41 N 1965.80 E 5978061.00 N 666387.91 E 11.371 1580.05
10266.90 90.400 312.810 8993.34 9048.34 2229.35 N 1944.21 E 5978082.46 N 666365.84 E 17.459 1607.09
1 02~}6.60 09.070 307.530 8993.48 9048.48 2248.50 N 1921.52 E 5978101.11 N 666342.74 E 18.333 1631.76
10319.60 86.960 303.650 8994.27 9049.27 2261.88 N 1902.83 E 5978114.07 N 666323.76 E 19.193 1649.76 ~
10353.40 86.700 298.010 8996.14 9051.14 2279.17 N 1873.87 E 5978130.72 N 666294.42 E 16.679 1674.37
10396.70 88.720 292.020 8997.87 9052.87 2297.45 N 1834.68 E 5978148.14 N 666254.84 E 14.588 1702.75
10442.40 90.930 301.710 8998.01 9053.01 2318.08 N 1793.96 E 5978167.87 N 666213.68 E 21.747 1733.79
10482.40 91.280 306.4 70 8997.24 9052.24 2340.49 N 1760.85 E 5978189.55 N 666180.09 E 11.930 1764.46
10520.30 91.890 314.400 8996.19 9051 .19 2365.04 N 1732.04 E 5978213.46 N 666150.74 E 20.977 1796.01
10550.20 93.740 316.340 8994.72 9049.72 2386.29 N 1711.06 E 5978234.25 N 666129.30 E 8.960 1822.22
10582.40 95.860 317.750 8992.03 9047.03 2409.77 N 1689.20 E 5978257.24 N 666106.93 E 7.898 1850.81
10613.50 90.930 324.620 8990.19 9045.19 2433.94 N 1669.76 E 5978280.98 N 666086.96 E 27.152 1879.41
10645.40 88.990 329.550 8990.21 9045.21 2460.71 N 1652.43 E 5978307.37 N 666069.05 E 16.607 1909.91
10674.80 91.370 337.130 8990.12 9045.12 2486.96 N 1639.25 E 5978333.32 N 666055.30 E 27.021 1938.78
10712.40 92.200 341.590 8988.94 9043.94 2522.12 N 1626.00 E 5978368.18 N 666041.29 E 12.060 1976.23
10737.00 92.200 341.590 8988.00 9043.00 2545.45 N 1618.24 E 5978391.33 N 666033.01 E 0.000 2000.79 Projected Survey
All data is in Feet (US Survey) unless otherwise stated. Directions and coordinates are relative to True North.
Vertical depths are relative to Well Reference. Northings and Eastings are relative to Well Reference.
Global Northings and Eastings are relative to NAD27 Alaska State Planes, Zone 4.
The Dogleg Severity is in Degrees per 100 feet (US Survey).
Vertical Section is from Well Reference and calculated along an Azimuth of 344.000° (True). c_/
Magnetic Declination at Surface is 25.9400(29-Mar-03)
Based upon Minimum Curvature type calculations, at a Measured Depth of 10737.00ft.,
The Bottom Hole Displacement is 3016.29ft., in the Direction of 32.446° (True).
21 April, 2003 - 13:53
Page 3 of 4
DrillQuest 3.03.02.005
Sperry-Sun Drilling Services
Survey Report for PBU_WOA E Pad· E-01A
Your Ref: API 500292016601
Job No. AKMW0002365920, Surveyed: 11 April, 2003
BPXA
North Slope Alaska
Comments
Measured
Depth
(ft)
Station Coordinates
TVD Northings Eastings
(ft) (ft) (ft)
Comment
9200.00
9250.00
10737.00
8676.15
8722.04
9043.00
1568.11 N
1568.82 N
2545.45 N
1812.32 E
1832.15 E
1618.24 E
Tie-On Point
Window Point
Projected Survey
~.
Survey tool program for E-01A
From
Measured Vertical
Depth Depth
(ft) (ft)
To
Measured Vertical
Depth Depth Survey Tool Description
(ft) (ft)
0.00
9200.00
0.00 9200.00
8676.15 10737.00
8676.15 BP High Accuracy Gyro (E-01)
9043.00 MWD Magnetic (E-01A)
~
21 April, 2003 - 13:53
Page 4 of4
DrillQuest 3.03.02.005
Sperry-Sun Drilling Services
North Slope Alaska
BPXA
PBU_WOA E Pad
E-01A PB1
~
Job No. AKMW0002365920, Surveyed: 11 April, 2003
Survey Report
21 April, 2003
Your Ref: API 500292016670
Surface Coordinates: 5975811.00 N, 664471.00 E (70020' 24.7789" N, 148039'54.9506" W)
Grid Coordinate System: NAD27 Alaska State Planes, Zone 4
~
Surface Coordinates relative to Project H Reference: 975811.00 N, 164471.00 E (Grid)
Surface Coordinates relative to Structure Reference: 2605.96 N, 1989.67 E (True)
Kelly Bushing: 55.00ft above Mean Sea Level
Elevation relative to Project V Reference: 55.00ft
Elevation relative to Structure Reference: 55.00ft
5pe"",,,,,,y-surJ
DRILLING seRVIc::es
A Halliburton Company
Survey Ref: 5vy4005
Sperry-Sun Drilling Services
Survey Report for PBU_WOA E Pad - E-01A PB1
Your Ref: API 500292016670
Job No. AKMW0002365920, Surveyed: 11 April, 2003
BPXA
North Slope Alaska
Measured Sub-Sea Vertical Local Coordinates Global Coordinates Dogleg Vertical
Depth Incl. Azim. Depth Depth Northings Eastings Northings Eastings Rate Section Comment
(ft) (ft) (ft) (ft) (ft) (ft) (ft) (0/100ft)
9300.00 22.870 88.260 8713.05 8768.05 1569.46 N 1851.71 E 5977420.70 N 666287.83 E 998.26 Tie-On Point
MWD Magnetic
9355.00 22.620 88.230 8763.78 8818.78 1570.11 N 1872.96 E 5977421.81 N 666309.07 E 0.455 993.02 Window Piont
9390.93 24.520 85.300 8796.71 8851.71 1570.93 N 1887.30 E 5977422.95 N 666323.39 E 6.211 989.87
9431.41 27.070 83.010 8833.15 8888.15 1572.74 N 1904.82 E 5977425.15 N 666340.86 E 6.762 986.78
9465.26 30.960 81.580 8862.75 8917.75 1574.95 N 1921.08 E 5977427.72 N 666357.07 E 11.672 984.42 ;
~
9507.24 44.770 80.190 8895.81 8950.81 1579.07 N 1946.45 E 5977432.39 N 666382.35 E 32.958 981.39
9529.19 47.220 71.930 8911.07 8966.07 1582.89 N 1961.74 E 5977436.55 N 666397.55 E 29.261 980.84
9560.58 52.510 59.770 8931.34 8986.34 1592.76 N 1983.52 E 5977446.89 N 666419.10 E 34.027 984.33
9592.31 60.180 51.320 8948.94 9003.94 1607.75 N 2005.20 E 5977462.35 N 666440.45 E 32.768 992.76
9623.99 66.430 45.330 8963.17 9018.17 1626.57 N 2026.29 E 5977481.63 N 666461.12 E 25.962 1005.04
9651.74 73.040 36.690 8972.79 9027.79 1646.21 N 2043.31 E 5977501.64 N 666477.71 E 37.669 1019.23
9677.30 79.470 27.350 8978.88 9033.88 1667.24 N 2056.43 E 5977522.95 N 666490.36 E 43.486 1035.83
9700.50 80.880 21.010 8982.84 9037.84 1688.08 N 2065.78 E 5977543.99 N 666499.26 E 27.603 1053.28
9731.10 82.730 16.070 8987.20 9042.20 1716.79 N 2075.41 E 5977572.90 N 666508.25 E 17.084 1078.22
9750.23 84.760 13.430 8989.29 9044.29 1735.18 N 2080.25 E 5977591.39 N 666512.68 E 17.343 1094.56
9787.25 88.630 7.440 8991.42 9046.42 1771.50 N 2086.93 E 5977627.85 N 666518.57 E 19.238 1127.64
9817.28 90.660 0.210 8991.61 9046.61 1801.44 N 2088.93 E 5977657.83 N 666519.91 E 25.005 1155.87
9842.50 90.31 0 357.570 8991.40 9046.40 1826.65 N 2088.45 E 5977683.03 N 666518.87 E 10.559 1180.24
9872.53 89.520 351.230 8991.44 9046.44 1856.52 N 2085.52 E 5977712.83 N 666515.29 E 21.275 1209.76
9909.78 85.990 349.110 8992.90 9047.90 1893.19 N 2079.16 E 5977749.35 N 666508.13 E 11.051 1246.76
9934.25 85.990 342.590 8994.61 9049.61 1916.85 N 2073.20 E 5977772.87 N 666501.65 E 26.580 1271.14
9970.78 91.720 334.490 8995.35 9050.35 1950.80 N 2059.85 E 5977806.51 N 666487.56 E 27.150 1307.45
10012.75 92.950 332.200 8993.63 9048.63 1988.27 N 2041.04 E 5977843.57 N 666467.94 E 6.189 1348.66 ~
10046.03 91.190 324.970 8992.43 9047.43 2016.63 N 2023.72 E 5977871.54 N 666449.99 E 22.345 1380.70
10075.38 91.980 321.270 8991.62 9046.62 2040.10 N 2006.11 E 5977894.61 N 666431.88 E 12.886 1408.11
10108.16 88.630 317.570 8991 .44 9046.44 2064.99 N 1984.80 E 5977919.03 N 666410.02 E 15.225 1437.91
10151.53 84.850 306.650 8993.92 9048.92 2093.98 N 1952.73 E 5977947.31 N 666377.33 E 26.602 1474.61
10199.28 89.070 301.890 8996.45 9051.45 2120.81 N 1913.35 E 5977973.27 N 666337.37 E 13.310 1511.26
10232.53 90.400 310.880 8996.61 9051.61 2140.51 N 1886.61 E 5977992.38 N 666310.20 E 27.331 1537.57
10264.88 90.130 316.870 8996.46 9051.46 2162.92 N 1863.30 E 5978014.28 N 666286.41 E 18.535 1565.54
21 April, 2003 - 13:50
Page 2 of 4
Dril/Quest 3.03.02.005
Sperry-Sun Drilling Services
Survey Report for PSU_WOA E Pad - E-01A PS1
Your Ref: AP/SOO292016670
Job No. AKMW0002365920, Surveyed: 11 April, 2003
BPXA
North Slope Alaska
Measured Sub-Sea Vertical Local Coordinates Global Coordinates Dogleg Vertical
Depth Incl. Azim. Depth Depth Northings Eastings Northings Eastings Rate Section Comment
(ft) (ft) (ft) (ft) (ft) (ft) (ft) (0/100ft)
10296.43 92.860 321.620 8995.63 9050.63 2186.81 N 1842.72 E 5978037.70 N 666265.30 E 17.359 1594.17
10347.75 95.860 329.030 8991.73 9046.73 2228.85 N 1813.62 E 5978079.10 N 666235.29 E 15.537 1642.61
10376.71 93.740 334.140 8989.30 9044.30 2254.22 N 1799.90 E 5978104.16 N 666221.02 E 19.045 1670.78
10407.10 90.400 337.480 8988.20 9043.20 2281.92 N 1787.46 E 5978131.58 N 666207.97 E 15.537 1700.83
10437.48 89.870 331.490 8988.13 9043.13 2309.32 N 1774.38 E 5978158.69 N 666194.29 E 19.794 1730.78
10468.78 87.930 324.970 8988.73 9043.73 2335.91 N 1757.91 E 5978184.91 N 666177.25 E 21.729 1760.88 .-..,,/
10502.38 86.080 321.800 8990.49 9045.49 2362.84 N 1737.90 E 5978211.40 N 666156.65 E 10.912 1792.28
10531.78 86.430 315.460 8992.41 9047.41 2384.85 N 1718.52 E 5978232.97 N 666136.79 E 21.551 1818.77
10562.83 88.460 311.050 8993.80 9048.80 2406.10 N 1695.94 E 5978253.72 N 666113.75 E 15.622 1845.42
10601.03 84.410 309.110 8996.17 9051.17 2430.64 N 1666.77 E 5978277.62 N 666084.05 E 11.751 1877.05
10632.28 82.030 305.590 8999.86 9054.86 2449.46 N 1642.11 E 5978295.89 N 666058.99 E 13.531 1901.95
10654.08 85.290 303.300 9002.27 9057.27 2461.71 N 1624.25 E 5978307.75 N 666040.86 E 18.237 1918.65
10678.00 85.290 303.300 9004.23 9059.23 2474.80 N 1604.32 E 5978320.40 N 666020.65 E 0.000 1936.72 Projected Survey
All data is in Feet (US Survey) unless otherwise stated. Directions and coordinates are relative to True North.
Vertical depths are relative to Well Reference. Northings and Eastings are relative to Well Reference.
Global Northings and Eastings are relative to NAD27 Alaska State Planes, Zone 4.
The Dogleg Severity is in Degrees per 100 feet (US Survey).
Vertical Section is from Well Reference and calculated along an Azimuth of 344.000° (True).
Magnetic Declination at Surface is 25.9400(29-Mar-03)
Based upon Minimum Curvature type calculations, at a Measured Depth of 10678.000.,
The Bottom Hole Displacement is 2949.32ft., in the Direction of 32.954° (True).
---'
----
21 April, 2003 - 13:50
Page 3 of4
DrillQuest 3.03.02.005
Sperry-Sun Drilling Services
Survey Report for PBU_WOA E Pad - E-01A PB1
Your Ref: AP/500292016670
Job No. AKMW0002365920, Surveyed: 11 April, 2003
BPXA
North Slope Alaska
Comments
Measured
Depth
(ft)
Station Coordinates
TVD Northings Eastings
(ft) (ft) (ft)
Comment
9300.00
9355.00
10678.00
8768.05
8818.78
9059.23
1569.46 N
1570.11 N
2474.80 N
1851.71 E
1872.96 E
1604.32 E
Tie-On Point
Window Piont
Projected Survey
-
Survey tool program for E-01 A PS1
From
Measured Vertical
Depth Depth
(ft) (ft)
To
Measured Vertical
Depth Depth Survey Tool Description
(ft) (ft)
0.00
9300.00
0.00 9300.00
8768.05 10678.00
8768.05 BP High Accuracy Gyro (E-01)
9059.23 MWD Magnetic (E-01A PB1)
~.
21 April, 2003 - 13:50
Page 4 0'4
DrillQuest 3.03.02.005
)
~Jfkì!E '~f fk~!Æ~~~!Æ
)
AT~A~1i.& OIL AND GAS
COIlSERVATION COMMISSION
FRANK H. MURKOWSKI, GOVERNOR
333 W. rrn AVENUE, SUITE 100
ANCHORAGE, ALASKA 99501-3539
PHONE (907) 279-1433
FAX (907) 276-7542
Alistair Sherwood
CT Drilling Engineer
BP Exploration (Alaska), Inc.
PO Box 196612
Anchorage,AJC 99519
Re: Prudhoe Bay Unit E-OIA
BP Exploration (Alaska), Inc.
Permit No: 203-033
Surface Location: 1253' SNL, 502' WEL, Sec. 06, TIIN, RI4E, UM
Bottomhole Location: 1120' NSL, 1169' EWL, Sec. 32, TI2N, R14E, UM
Dear Mr. Sherwood:
Enclosed is the approved application for permit to redrill the above development well.
This permit to· redrill does not exempt you from obtaining additional permits or approvals
required by law from other governmental agencies, and does not authorize conducting drilling
operations until all other required permits and approvals have been issued. In addition, the
Commission reserves the right to withdraw the permit in the event it was erroneously issued.
Operations must be conducted in accordance with AS 31.05 and Title 20, Chapter 25 of the
Alaska Administrative Code unless the Commission specifically authorizes a variance. Failure
to comply with an applicable provision of AS 31.05, Title 20, Chapter 25 of the Alaska
Administrative Code, or a Commission order, or the terms and conditions of this permit may
result in the revocation or suspension of the permit. Please provide at least twenty-four (24)
hours notice for a representative of the Commission to witness any required test. Contact the
Commission's North Slope petroleum field inspector at 659-3607 (pager).
Sincerely,
iJ(. . ¿ ~/{ If:.~..---? . ~ ·z--:-
/Ii' . "/
Rand uedrich
Commissioner
BY ORDER OF THE COMMISSION
DATED this 4 1" day of March, 2003
cc: Department ofFish & Game, Habitat Section w/o encl.
Department of Environmental Conservation w/o encl.
Exploration, Production and Refineries Section
lA/6A- 3 i~i LOo'5
1 a. Type of work 0 Drill II Redrill '
ORe-Entry 0 Deepen
2. Name of Operator
BP Exploration (Alaska) Inc.
3. Address
P.O. Box 196612, Anchorage, Alaska 99519-6612
4. Location of well at surface X=664471,Y=5975811
1253' SNL, 502' WEL, SEC. 06, T11 N, R14E, UM
At top of productive interval x = 666303, Y = 5977422
317' NSL, 1371' EWL, SEC. 32, T12N, R14E, UM
At total depth x = 666080, Y= 5978220
1120' NSL, 1169' EWL, SEC. 32, T12N, R14E, UM
STATE OF ALASKA
ALASKA ~.1 AND GAS CONSERVATION COMM. ~ION
PERMIT TO DRILL
20 AAC 25.005
1 b. Type of well 0 Exploratory 0 Stratigraphic Test II Development Oil
o Service 0 Development Gas 0 Single Zone 0 Multiple Zone
5. Datum Elevation (DF or KB) 1 O. Fi~ld and Pool
KBE = 55' Prudhoe Bay Field I Prudhoe
6. Property Designation Bay Pool
ADL 028299
7. Unit or Property Name
Prudhoe Bay Unit
8. Well Number I'
E-01 A
9. Approximate spud dat~
04/01/03 / Amount $200,000.00
14. Number of acres in property 15. Proposed depth (MD and TVD)
2560 10665' MD / 8995' TVDss
o 17. Anticipated pressure {~ 20 AAC 25.035 (e) (2)}
90 Maximum surface 2244 psig, At total depth (TVD) 88001 I 3300 psig
Setting Depth
Top Bottom Quantity of Cement
I enQth MD TVD MD TVD linclude-staQe data.)
16611 90041 8494' 10665' 8995' 61 sx Class 'G' ?
11. Type Bond (See 20 AAC 25.025)
Number 2S100302630-277
12. Distance to nearest property line 13. Distance to nearest well /
ADL 028300, 41111 MD No Close Approach
16. To be completed for deviated wells
Kick Off Depth 9415' MD Maximum Hole Angle
18. casingJ~~gram Specifications
Hole CasinQ Weiaht Grade CouolinQ
3-3/4" 3-3116" x 2-7/8" 6.2#/6.16# L-80 ST-L
19. To be completed for Redrill, Re-entry, and Deepen Operations.
Present well condition summary
Total depth: measured
true vertical
Effective depth: measured
true vertical
Casing
Structural
Conductor
Su rface
Intermediate
Production
Liner
9930 feet
9355 feet
9587 feet
9034 feet
Length
Plugs (measured)
Junk (measured)
Fish: See Diagram
Size
Cemented
MD
TVD
104'
26981
87711
20"
13-3/8"
9-5/8" x 11-3/4"
100 sx Cement
286 sx High Yield, 4230 sx PF
925 sx Howco Ught, 250 sx 'G', 420sx PF
1041
2698'
8771'
104'
2698'
8287'
1701'
7"
461 sx Class 'G'
82291 - 9930'
77961 - 93551
20. Attachments
Open: 9545' - 9560', 9605' - 96181
Sqzd: 9382' - 9397', 94101 - 9440', 9451' - 9486', 9499' - 9539', 9565' - ·9605'
true vertical Open: 8995' - 90091, 9051' - 9063' .. ...., ."1. .....
Sqzd: 8844' - 8858', 8870' - 8897', 8908' - 8940', 89521 - 8989';· 19Òf3''::·9051 I
II Filing Fee 0 Property Plat II BOP Sketch 0 Diverter Sketch II Drilling Program
II Drilling Fluid Program 0 Time vs Depth Plot 0 Refraction Analysis 0 Seabed Report 1120 AAC 25.050 Requirements
Contact Engineer NamelNumber: Alistair Sherwood, 564-4378 Prepared By Name/Number: Terrie Hubble, 564-4628
Perforation depth: measured
,'" ,I i . ':~
21. I hereby certify that the fO. .r~ç. 0.' i~9.. i~ 1. .t U. e and correc.t to. t.he.. ..b. e.. st... 0... f. ...m. Y... k....n.. .~. ...~.I..e.... d.. .g... e.. ..
Signed AlistairSherwood Ij~1 Jw~af :. .. Titl~ ?: DnlhngE~gln~er
L ~'..CQpt(Qi_,$ic.>IUø\QJdÿ:~'L~,::,¡~, . I~lí~,~',: "...;",:.1,,1
Date ú2/21/~3
, ,"J
" '.<,,:"':,: ~::"I .':,',.~
Permit Num.bßr API Number
;:2..{)-") -033 50- 029-20166-01
Conditions of Approval: Samples Required 0 Yes !XI No
Hydrogen Sulfide Measures mVes 0 No
Required Working Pressure for BOPE 0 2K 0 3K
)Other: Tis+ ßO ~ E ~ '55"00 ,;)S.,'
Approved By It ¿:.. ;-?oj' ii /.¿J ~ //'2) Commissioner
Form 10-401 Rev. 12-01-85
rpprpY-ªI...Qate See cover letter
,3 L..{ \ U .....-) for other requirements
Mud Log Required 0 Yes f&1 No
Directional Survey Required ~ Yes 0 No
o 4K D5K D10K D15K 0 3.5K psi for CTU
by order of
the commission
Date j I r;/ C),3
Submit In Triplicate
)
BP
E-01 A CTD Sidetrack
)
Summary of Operations:
A 3%" OH through tubing sidetrack is planned for E-01. The sidetrack, E-01 A, will exit the 7" liner in the Ivishak Z4 and
will come down through the conglomerate of Z3 to a Z2B target.
Phase 1, Well preparation: After verifying tubing & casing, wellhead and tree valve integrity a thru-tubing 4Y2" x 7"
whipstock will b~. n... on e-line and set with a highs ide orientation at 9415'. Following the
whipstock set, 0 Is of cement will be pumped and squeezed with 1 %" service coil to
P&A the open . órations below the whipstock.
Phase 2, CTD Operations: Nordic 1 CTD rig will MIRU with 2%" coil. After milling a window in the 7" liner off of the
whipstock @ 9415', -1250' of 3%" open hole will be drilled. From Z4, drilling will be
through the conglomerate of Z3 and into a Z2B reservoir target. Solid 2Ÿ8" x 3-3/16" liner
will complete the sidetrack. This will be cemented ,'place and selectively perforated. One
objective will be to place the cement top at 9,300', -100' above the window. This is to
preserve future sidetrack opportunities, following a cut and pull of the sidetrack liner.
Nordic 1 will most likely move onto E-01 during the first week of April 03. /"
Mud Program:
Plan to mill the window in the 7" liner with an 8.6ppg 2% KCI / Y2ppb biozan fluid system. Thereafter an 8.6ppg Flo-Pro
mud system will continue to be used to drill the formation.
Disposal: /'
· All drilling and completion fluids and all other Class II wastes will go to Grind & Inject. ,.
· All Class I wastes will go to Pad 3 for disposal.
Casing Program:
The production liner will be solid 2}Í¡" x 3-3/16" L80, run from TD, 10,665'md, (8995'tvdss) to 9,004'md (-8494'tvdss). It
will be cemented back to 9,300' with approx 12Y2bbls of Class G Latéx cement. The plan is to bring the cement top -
100' above the window to preserve future sidetrack opportunities. If the cement fails to hydraulically isolate the sidetrack
a liner top packer will be run to complete the job.
Well Control:
· BOP diagram is attached. "
· Pipe rams, blind rams and the CT pack off will be pressure tested to 400 psi and to 3500 psi. /
· The annular preventer will be tested to 400 psi and 2500 psi.
Directional
· See attached directional plan, (E-01A Plan #5. Max. planned hole angle is 90°)
· Magnetic and inclination surveys will be taken with MWD every 30 ft.
Logging
Real time MWD & Gamma Ray logs will be run over all of the open-hole section. A memory CNL log will be run in the
cased hole.
Hazards
· H2S on E-01 has not been measured. Max recorded H2S on E-Pad is 1 Oppm from well E-08
· There is one 10' throw fault, which will be crossed perpendicularly. There is a moderate chance of lost circulation
although the parent well crossed the same fault without incident.
Reservoir Pressure
Res. press. is estimated to be 3300 psi at -8800'ss (7.2 ppg emw). Max. surface pressure with gas (0.12 psi/ft) to
surface is 2244 psi. /
TREE =
WELLHEAD =
ActuÄtoR;
Kä:Els/" ;;......
.......,........... ..........."".
BF. ELEV =
KOP=
Max Angle =
·Datum·MÖ·;·······
......",.."..,....,....."......",...,...,....... ....
Datum ND =
DATE
04/19/76
06/77
01/24/01
03/08/01
07/16/01
07/27/02
6" crw
MCEVOY
'6tls
........... ...."........."..."..".
55.02'
26.22'
3146'
29 (~ !~~~'
9394'
......".",......,..,...,....,..".
8800' SS
)
13-3/8" CSG, 72#, L-80, ID = 12.347" l-i 2698' r-J
Minimum ID = 3.725" @ 9006'
4-1/2" OTIS XN NIPPLE
I TOP OF 7" LNR 1-1 8260'
9-5/8" CSG, 47#, L-80, ID = 8.681" 1-1 8771'
ÆRFORA TION SUMMARY
REF LOG: SWS BHCS ON 09/15/75
ANGLEATTOPÆRF: 21 @ 9565'
Note: Refer to Production DB for historical perf data
SIZE SPF INTERVAL Opn/Sqz DATE
HJII 4 9382 - 9397 S 04/26/86
HJII 4 9410 - 9440 S 04/26/86
HJII 4 9451 - 9486 S 04/26/86
HJII 4 9499 - 9539 S 04/26/86
3-3/8" 6 9545 - 9560 0 02/11/96
3-1/8" 4 9565 - 9605 S 02/11/96
3-3/8" 6 9605 - 9610 0 02/11/96
3-3/8" 6 9610-9618 0 02/11/96
I PBTD 1-1
9833'
7" LNR, 26#, L-80, .0383 bpf, ID = 6.276" 1-1
9930'
REV BY COMMENTS
ORlGINA L COMA-ErION
RWO
SIS-QAA CONVERTED TO CANVAS
SIS-MD FINAL
RNITP CORRECTIONS
CMO/KK MAX ANGLE CORRECTION
DATE
11/23/02
E-01
e
~
"
......
I
II
µ
I
II
..
/.
){
-,
~
B..
REV BY COMMENTS
A Y /TP ÆRF CORRECTIONS
SAfE"""l~OTES: CATEGORYII- NO SSSV
1973' 1-17" OTIS SSSV LANDING NIP, ID = 4.562" 1
8229' 1-1 TOP SEAL ASSY AND BOTLNR PKR 1
8998'
9002'
9006'
9008'
9012'
9414'
9587'
9587'
9603'
1-17" X 4-1/2" WD PKR 1
1-14-1/2" OTIS X NIP, ID = 3.8131
1-14-1/2" OTIS XN NIP, ID = 3.725 1
1-141/2" TBG TAIL WLEG 1
1-1 ELMD TT LOGGED 05/08/86 1
1-1 MARKER JOINT 1
1-1 FISH: 11 X 1/2 X 3/16 CENTER
1-1 TOP OF CEMENT 1
1-1 SAND TO 9673' 1
PRUDHOE BA Y UNIT
WELL: E-01
ÆRMIT No: 1750400
API No: 50-029-20166-00
SEC 6, T11 N, R14E. 1253' NSL & 502' EWL
BP Exploration (Alaska)
TREE = 6" CrN
WELLHEAD = MCEVOY
ÄC'fUÄ'fÖR'; , "Otis
........,.,....,..,.,...,....,,,.....,...,,,. ",....... .......,'..'...........,.
KB. ELEV = 55.02'
BF. ELEV = 26.22'
.. . ....., ",,,,,,,,,.,,
KOP = 3146'
Max Angle = 29 @ 7300'
......... ...........,0<.."
Datum MD = 9394'
Datum TVD = 8800' SS
DATE
04/19/76
06/77
01/24/01
03/08/01
07/16/01
07/27/02
')
E-01A
Proposed CTD Sidetrack
SAfE' '10TES: CATEGORY II . NO SSSV
13-3/8" CSG, 72#, L-80, ID = 12.347" l-i 2698' ~
Minimum ID = 3.725" @ 9006'
4-1/2" OTIS XN NIPPLE
I TOP OF 7" LNR 1-1 8260'
9-5/8" CSG, 47#, L-80, ID = 8.681" 1-1 8771'
ÆRFORA TION SUMMARY
REF LOG: SWS BHCS ON 09/15/75
ANGLE AT TOP ÆRF: 21 @ 9565'
Note: Refer to Production DB for historical perf data
SIZE SPF INTERVAL Opn/Sqz DATE
HJII 4 9382 - 9397 S 04/26/86
HJII 4 9410 - 9440 S 04/26/86
HJII 4 9451 - 9486 S 04/26/86
HJII 4 9499 - 9539 S 04/26/86
3-3/8" 6 9545 - 9560 isolated proposed
3-118" 4 9565 - 9605 S 02/11/96
3-3/8" 6 9605 - 9610 isolated proposed
3-3/8" 6 9610 - 9618 isolated proposed
I Mechanical Whipstock
L2 "l~IÇ
H[/'I
I PBTD 1-1
7" LNR, 26#, L-80, .0383 bpf, ID = 6.276" 1-1
9833'
9930'
REV BY COMMENTS
ORIGINAL COMPLETION
RWO
SIS-QAA CONVERTED TO CANVAS
SIS-MD FINAL
RNfTP CORRECTIONS
CMO/KK MAX ANGLE CORRECTION
I
II
µ
e
;"
......
1973' 1-17" OTIS SSSV LANDING NIP, ID = 4.562" 1
~
8229'
1-1 TOP SEA L ASSY AND BOT LNR PKR 1
J
II
I fw
Þum~
~
8998' 1-17" X 4-1/2" WD PKR 1
9002' - 4-1/2" OTIS X NIP, ID = 3.8131
9004' - Top of 3-3/16" Liner 1
9006' - 4-1/2" OTIS XN NIP, ID = 3.725 1
9014' _ 3-1/2" X NIP, ID:;: 3.813" 1
9008' 1-141/2" TBG TAIL WLEG 1
9012' 1-1 ELMD TT LOGGED 05/08/86 1
9300'
1-1 Top of Cernent
9700' 1-13..3116 x 2·,7/8 X..over
t ,~,
r---ï
r---ï
1l~_,
, I O(gfo~
3-3!1G" X 2-7/8" cml.'ed and perfedl-l
9414' 1-1 MARKER JOINT 1
I
I
I
9587'
9587'
9603'
1-1 FISH: 11 X 1/2 X 3/16 CENTER
1-1 TOP OF CEMENT 1
1--1 SA ND TO 9673' 1
DA TE REV BY COMMENTS
11/23/02 A Y fTP ÆRF CORRECTIONS
PRUDHOE BA Y UNIT
WELL: E-01
PERMIT No: 1750400
Apt No: 50-029-20166-00
SEC 6, T11 N, R14E. 1253' NSL & 502' EWL
BP Exploration (Alaska)
BP Amoco
WELLPATH DETAILS
'1....5 E.o1A
500u2016601
........t _lpath: E.o1
Tie on MD: 9415.00
'Ug:
Ref. Datum: 1 : 01 111611975 00:00
55.0Oft
v~ O+r:B!: ~~{;
:::::'~
344.00' 0.00 0.00 0.00
REFERENCE INFORMATION
~e~'W~~¡ ~~~::~~ ~~:~:n~~;~ t~~North
Section (VS) Reference: Slot - 01 (O.ooN.O.ooE)
Measured Depth Reference: 1 : 018/161197500:00 55.00
Calculation Method: Minimum Curva!1Xe
aECTIOH DETAJLS
+£I·W OL.. Tf.l:. T.rget
1 '-.00 22.... 5~! 8505.34 m~:~ 18eo.t8 0.00 0.00 8-83.78
. 8415.00 22.3. a818.2t ntl5.sa 0.48 1&4.81 887.38
3 0435.00 24.15 aa:S7.5511 ir~:: J ~g:5 0.00 SJ.8S.44
4 8502.03 37... U.2. HSlS.OO 0.00 871."
. a727.17 ".30 2$.05 '"1.551 292.00 1050.48
e 10177.17 H.ts ~~~:g~ a~.57 205SÞ.14 12.00 270.00 1477.01
7 10S8S.00 ..... 8"5.32 fl5ð2..25 12.00 270.00 1822.77
_8550
.5
~ 8600
!:2.8650
.c
'S.,8700
CI)
a 8750
ëi
U 8800
~
CI) 8850
>
~ 8900
..
I- 8950
ANNOTATIONS
TYD annotation
8805.34 HOG.OO TIP
aa19.21 M15.oo KOP
aa37.59 9Q:5.00 3
8895.00 U02.03 4
8998.59 9727.17 5
_.57 10177.17 6
8995.32 10665.00 TD
_2150
.5
:: 2100:'
Q
!:2.2050
bp
LEGEND
E-01 (E-01)
Plan#5 E-01A
Plan #5
T
^M
Azimuths to True North
Magnetic North: 25.96"
Magnetic Field
Strength: 57543nT
Dip Angle: 80.85"
Date: 2/25/2003
Model: BGGM2002
-------------- -----
Plan: Plan #5 (E-01/PIan#5 E-01A)
Created By: Brij Potnis
Date: 2125/2003
+'éFW Shape
í~!~wr' ~I ~ ~~ æ
-
+
:ë2000
i 1950
Z
~1900
-
.c
'51850
o
U) 1800
ê
/
[TOfTE-01);
j
----- ----- - --- -- -- -
C(\nlar;t Inforrn=3tÎf)n.
~~~:~~~î. {~~j!'tï!;~~~~::)i~(~.~)1!1
Bal<0r HU9nl;'~ INTFQ. (~ú7) ;¿f?-í::í::C'!)
-:
)
1550
~
1250 1300 1350 1400 1450 1500 1550 1600 1650 1700 1750 1800 1850 1900 1950 2000 2050 2100 2150 2200 2250 2300 2350 2400 2450 2500 2550
West(-)/East(+) [50ft/in]
Ipm
./
'E-01A T5.4'
8400
8450
8500
IINTEQ
i
"#-'.I.-.:'.:"~
j~
i
L-.
l~
~-
j\,
1\
I "., .ill
I -..~ ~I
I ì E-01A.T5.1 ¡
i
I
I
I
i
b,E::01JE:01)1
700 750 800 850 900 . 950 '10001050110011~0120012501300135014001~50150015501~001650170017501800185019001950 20002050 2100 2150 2200 2250 2300 2350 2400 2450 2500 2550 2600 2650
Vertical Section at 344.00° [50ft/in]
9000
9050
9100
2400
2350
2300
2250
2200
1750
1700
1650
1600
l.JSQEJ,
~\E/IJ
----- -
-.- -- 2/26/2003 - 8:29AM·
) BP )
Baker Hughes INTEQ Planning Repurt
- - - -- .- --. - -------- -- --- ---
,-' 1 f.Q
I'--~~~a~~;--~~~~i~~~~-·----~--·-·---·-·..·--':----·-.--.--..-...--..-
~ite: PB E Pad
Well: E~01
WëUpath: Plan#5 E..01A
Field: Prudhoe Bay
North Slope
UNITED STATES
Map System:US State Plane Coordinate System 1927
Geo Datum: NAD27 (Clarke 1866)
Sys Datum: Mean Sea Level
".....__'._~.~.~_'..~_,__~__._...._.__,_____._..._..,__....._.,_..._.____.____......._.___..___................._...,..._.'..._.____..___~._._.._..__~_.______~.__.__..._.,.'.____.._.____._____~__w._.~_.'~___,..____,...~
Date: 2/26/2003 Time: 08:30: 1.9
Co~ordinatl~(NE)Rererence: Well: E-01, True North
Veiti¢aI(TVD) Reference: Systern: Mean Sea Level _ _
Seëtion (VS) Rèference: Well (O.00N,O.OOE,344.00Azi)
SurveyCalCulationlVletbod: MinilTium Curvåture -- - - - Db:
----.--.-----------
_____.._,_..__.__n.'_._____
Map Zone:
Coordinate System:
Geomagnetic Model:
Alaska, Zone 4
Well Centre
BGGM2002
___.____""__'_._____"'0'__.______'..'_____"_____' H'_ .__.___.,,_._,_,_,,__.__..__._~____,,_~._..___..__..___________.____._______.____.._M_._.__.._._._._.,__.._.___.__..,__.._______w_,_._..._____.___.__.___._,___.__...___..._______._______,,__
--,.-.-----..--..----,.-.--
_____.._.___M._.._'._____._"'_.____.__
-----.-------...-----..--.--.-.-,.---------.--
Site: PB E Pad
TR-11-14
UNITED STATES: North Slope
Site Position: Northing:
From: Map Easting:
Position Uncertainty: 0.00 ft
Ground Level: 0.00 ft
5973160.88 ft
662538.97 ft
Latitude:
Longitude:
North Reference:
Grid Convergence:
70 19 59.134 N
148 40 53.054 W
True
1.24 deg
__..____._._.__.____.M_..__.__..__._..__.._..._______..____.._..___.._._.____~__._.__._._,__._._..__._..,.____,_._____._.__.__._______..__.__.__,___..._._.....____.___ __._..___,,_~__,,__._.._.._,._..___,,___._..__________._..____._.__.._..___......_._____.. . _,,,.,.. ___ __.._____.._._._
--------.--------..,--...----
-.----.-----.-...-----.-.-.-..--------------.
____M____._
Well: E-01 Slot Name:
E-01
Well Position: +N/-S 2608.26 ft Northing: 5975811.44 ft Latitude:
+E/-W 1988.67 ft Easting: 664470.52 ft Longitude:
Position Uncertainty: 0.00 ft
01
70 20 24.783 N
148 39 54.964 W
_.~....._. .-._-,.__.-_._--._---_.._---~----_._-----_._.._------------..-----.------.---.-.--..--.-.--..----.-,--
-,--..,-------------.---..-------.--.---.-.---.--------.----.--
----.----.-.-.-.-.--.-.-.--
.. __.~__..__.._..._.___.__.__..._,,___._.......___...____.____..____h____.__...__.__h.__'._.__hh_~.___._..__,,__...__..._n.______._.__....__....__.,.._..________.._,___.~ __._... .'h__"__'__'_h'_'h'_'__'_"'_'.,_._...~_ .__......,.,,_..._.___...__~...._..._.___.__._..__"_.__ '_._.__ ...___.....,_~.._"~__....___..._._.___.___._.___~
Wellpath: Plan#5 E-01A
500292016601
Current Datum: 1 : 01 8/16/1975 00:00
Magnetic Data: 2/25/2003
Field Strength: 57543 nT
Vertical Section: Depth From (TVD)
ft
0.00
+N/-S
ft
0.00
Drilled From:
Tie-on Depth:
Above System Datum:
Declination:
Mag Dip Angle:
+E/-W
ft
0.00
E-01
9415.00 ft
Mean Sea Level
25.96 deg
80.85 deg
Direction
Height 55.00 ft
344.00
--..---.--
--_._---~
------.----
Targets
.......,-..-...,....---.-......._.......-... n....__'_.~.·..__.....____.___..
Map l\'lap <--- Latitude --> <-- Longitude --...>
Name Description TVD +N/-S +E/-W Northing Easting Deg Min See Deg Min Sec
Dip. Dir. ft ft ft ft ft
-. .- - --.... --- -- -- - _. ____. __ _ __ _ _._ ._.__.__ h _ --- - - --. .--- -- ----- _ _ _ _ ._. . ,,_. _..._. __ _ u_ ._ - - .. -- ~- -- - -. -
E-01A Polygon5.1 0.00 1744.17 2048.38 5977600.00 666480.00 70 20 41.934 N 148 38 55.117 W
-Polygon 1 0.00 1744.17 2048.38 5977600.00 666480.00 70 20 41.934 N 148 38 55.117 W
-Polygon 2 0.00 2113.17 1871.42 5977965.00 666295.00 70 20 45.564 N 148 39 0.285 W
-Polygon 3 0.00 2264.17 1599.65 5978110.00 666020.00 70 20 47.049 N 148 39 8.224 W
-Polygon 4 0.00 2494.13 1604.69 5978340.00 666020.00 70 20 49.311 N 148 39 8.076 W
-Polygon 5 0.00 2364.50 2041.99 5978220.00 666460.01 70 20 48.035 N 148 38 55.299 W
-Polygon 6 0.00 1695.67 2207.37 5977555.00 666640.01 70 20 41.457 N 148 38 50.472 W
E-01A T5.3 8996.00 2280.04 1925.10 5978133.00 666345.00 70 20 47.205 N 148 38 58.715 W
E-01A T5.4 8996.00 2372.84 1662.05 5978220.00 666080.00 70 2048.118 N 148 39 6.400 W
E-01A T5.2 8997.00 1952.80 2113.98 5977810.00 666541.00 70 20 43.986 N 148 38 53.199 W
E-01A T5.1 8999.00 1687.65 2071.15 5977544.00 666504.00 70 20 41.378 N 148 38 54.452 W
___ u,__~ ,___, ._ _ __ ._..___.____..._.___ _~_..._.___.____
n.___.._ ___..__._._"~,,___._".__.,___ __._..._____~.__._____ . ~~.._.______
_.___________._____ _____________ ________________. ___ _______ _..I
Annotation
_.,~ .._._"...__.. ._.. _...._'".._~_._..______. .... ._._.'"__.~.~. ._.. .__. ......__m. _.. ._.,,_ __.___"., .,..___ _..'_.. ",___,_,__..._,_.,,___._ __,__._.._..._ ..__,_.
MD TVD
ft ft
9400.00 8805.34 TIP
9415.00 8819.21 KOP
9435.00 8837.59 3
9502.03 8895.00 4
9727.17 8998.59 5
10177.17 8996.57 6
I 10665.00 8995.32 TO
L_ ________________ ___ ____. ____ ______________________ ______
___ __n·__._·..___.__ _
___ _._.____,_._ . .__~ _....-_ __.___..__,_ .._"._.____.____ .__,,~,,___._____ __.__.~.~__._.___.._ _____4_·_____·__~_____·__·_·_____··_·____ _..__. ..._..~___.__.."__ __._","'~
bp
,__.,__...._._..,__.._._..M...__~,_.___._..__···,~~_..~_'_'._"__'W,._.W
Company: BP Amoco
Field: Prudhoe Bay
Site: PBE Pad
Well: E~01
Wellpath: Plan#5 E-01A
---_.._._.__.._~--~-
) BP)
Baker Hughes INTEQ Planning Repurt
'.:to.n......... ·...~N "'·WWMW.N'MMW,N."'"
INTEQ
".~~".w.__~_,___.____.~".___.__.-:_".._.,,__. ·'.~__~~'_'_____~~W'_'·"_._"."___-:'~"~'_'__"'___'__'.~__"'':''''''_~_''__'''_''~'''_'_'_''_ _'_:"'_~"_".'__'__'.__.__._.__._.__"__.____ _..._._.___ "__''''__'_'__'__..._...__._..___.~____...
. .... .. . .. . . .... .. '. . .: . . . . .
Datë: 2/26/2003 Time: 08:30: 19 Page:
Co-ordi~ate(NI!:)lteference: Well: . E-01,. True. North
Vertical <TYD) Reference: System: Mean Sea Level
Section (VS) Rëference: Well (0.OqN,O.00E,344.00Azi)
SurveyCålclllätion Method: Minimum CurVature . Db:
--..-----.--.------.----..---.--------.
Plan: Plan #5
Identical to Lamar's Plan #5
Principal: Yes
~-----_.__.-._-------~---_.._---_._,-~
..--.-.-.-----
-------------------'--
---_._-
Date Composed:
Version:
Tied-to:
2/25/2003
1
From: Definitive Path
----,~-'._-_._..._--_.__._._._--,-
2
._----~.--
----------~_._----
-----..----...---..-,..-.----.-.----
Plan Section Information
1- MD Inel Azim TVÐ +N/-S +E/-W -'-OLS-·- Build Tùrn TFO Target
ft deg deg ft ft ft deg/100ft> degl1 OOft deg/100ft deg
.·.___·______···_.._..·_._·___·__·_h_...~_._.__.·......_.~..._...__.___.._._..._.._..___._~_____._._~...___...,______._.._...._~____...._______._..__.____....._.._...~_..._..___.__._._._.~.__.~__,._~__....._....__._.~.............__._._~__..__._.._.._.._..._____.......___.___.__
9400.00 22.42 88.20 8805.34 1570.63 1890.18 0.00 0.00 0.00 0.00
9415.00 22.35 88.25 8819.21 1570.81 1895.89 0.48 -0.47 0.33 164.81
9435.00 24.15 88.25 8837.59 1571.05 1903.78 9.00 9.00 0.00 0.00
9502.03 37.56 88.25 8895.00 1572.10 1938.06 20.00 20.00 0.00 0.00
9727.17 90.30 25.05 8998.59 1693.71 2073.90 33.00 23.43 -28.07 292.00
10177.17 90.18 331.05 8996.57 2126.98 2059.14 12.00 -0.03 -12.00 270.00
10665.00 90.09 272.51 8995.32 2372.87 1662.25 12.00 -0.02 -12.00 270.00
Survey
-~--._.--.-___.__,,_._.___..__.._,_.,_,__,.__._._______.--_...___._____.__"_.,....~.._..'".._,..,_,_______.,.__ __.______.___._____.,.__.~..____,..__... .__.__,_____~...__"____.~_._.___,__._.._..~__~__..___.__ _,_________,,________ ____h_·___._.___..~_,__.__.~~..,_._~__..
,.._.._~-_.__........_._.__...._.._.__..._......._--~..-.....-.-...-..-..-..-...-......-.-. .....-.-..-.-.---.-..--.---..-.....--....-......-.---.-...--.-.-...--.-...-....-..----.......-..---.-..-.-....... ....-...........-... -.....-.---....-. .........-......--...-......-....-. _..._.~.....~..__._._.._...__._...__...._._._......_._....-..--..........-.-..-.......-........-.-
MD
ft
......~.._...._........'..-'-... ......~...-
9400.00
9415.00
9425.00
9435.00
9450.00
Incl Azirn SSTVD N/S E/W MapN
deg deg ft ft ft ft
...._......._.~.....~................. _'__'M ....__..._....__.~...._.~_. ... ...._.__..........~..__......._...._~.._..~.........._...........'....__.........._...._.._...._~._..._._..........._._...'.....~....._...
22.42 88.20 8805.34 1570.63 1890.18 5977423.04
22.35 88.25 8819.21 1570.81 1895.89 5977423.35
23.25 88.25 8828.43 1570.93 1899.77 5977423.55
24.15 88.25 8837.59 1571.05 1903.78 5977423.76
27.15 88.25 8851.11 1571.25 1910.27 5977424.10
MapE VS DLS
ft ft deg/100ft
...._..._....~...~.._._m.~....._._._.._..-_.....__.._...........n........._..._......'w.._..__..._..~
666325.66 988.78 0.00
666331.36 987.38 0.48
666335.23 986.42 9.00
666339.25 985.44 9.00
666345.73 983.84 20.00
9475.00
9500.00
9502.03
9525.00
9550.00
9575.00
9600.00
9625.00
9650.00
9675.00
9700.00
9725.00
9727.17
9750.00
9775.00
9800.00
9825.00
9850.00
9875.00
9900.00
9925.00
9950.00
9975.00
10000.00
10025.00
10050.00
10075.00
10100.00
10125.00
10150.00
10175.00
10177.17
10200.00
10225.00
10250.00
32.15
37.15
37.56
40.91
45.54
50.91
56.79
63.03
69.51
76.16
82.91
89.71
90.30
90.30
90.30
90.30
90.29
90.29
90.29
90.28
90.27
90.27
90.26
90.25
90.24
90.23
90.22
90.21
90.20
90.19
90.18
90.18
90.18
90.18
90.17
- ----,.-.-.-.-- ..--""-"--
88.25
88.25
88.25
77.49
67.49
59.08
51.90
45.66
40.08
34.97
30.14
25.45
25.05
22.31
19.31
16.31
13.31
10.31
7.31
4.31
1.31
358.31
355.31
352.31
349.31
346.31
343.31
340.31
337.31
334.31
331.31
331.05
328.31
325.31
322.31
8872.83
8893.39
8895.00
8912.81
8931.05
8947.71
8962.47
8975.00
8985.07
8992.44
8996.98
8998.59
8998.59
8998.47
8998.34
8998.21
8998.08
8997.95
8997.83
8997.71
8997.58
8997.47
8997.35
8997.24
8997.13
8997.03
8996.93
8996.83
8996.74
8996.66
8996.58
8996.57
8996.50
8996.42
8996.35
--.-.----.-.-
1571.62
1572.06
1572.10
1573.94
1579.14
1587.56
1599.01
1613.28
1630.05
1648.99
1669.70
1691.75
1693.71
1714.62
1737.98
1761.78
1785.95
1810.42
1835.12
1859.99
1884.95
1909.95
1934.91
1959.76
1984.44
2008.87
2032.99
2056.74
2080.05
2102.85
2125.08
2126.98
2146.69
2167.61
2187.78
1922.63
1936.83
1938.06
1952.42
1968.69
1985.28
2001.86
2018.09
2033.62
2048.14
2061.35
2072.97
2073.90
2083.06
2091.95
2099.59
2105.98
2111.10
2114.92
2117.45
2118.68
2118.60
2117.21
2114.51
2110.52
2105.24
2098.69
2090.89
2081.85
2071.61
2060.18
2059.14
2047.61
2033.93
2019.17
5977424.75
5977425.50
5977425.56
5977427.72
5977433.27
5977442.05
5977453.87
5977468.48
5977485.59
5977504.84
5977525.84
5977548.14
5977550.12
5977571.22
5977594.77
5977618.73
5977643.03
5977667.60
5977692.38
5977717.30
5977742.28
5977767.27
5977792.19
5977816.98
5977841.56
5977865.87
5977889.84
5977913.41
5977936.51
5977959.08
5977981.06
5977982.93
5978002.38
5978022.99
5978042.84
666358.08
666372.26
666373.49
666387.81
666403.95
666420.36
666436.68
666452.59
666467.75
666481.85
666494.60
666505.74
666506.62
666515.32
666523.69
666530.81
666536.67
666541.25
666544.53
666546.51
666547.19
666546.56
666544.62
666541.38
666536.85
666531.04
666523.96
666515.64
666506.09
666495.35
666483.45
666482.36
666470.41
666456.27
666441.07
980.79
977.30
976.99
974.81
975.32
978.84
985.28
994.52
1006.36
1020.57
1036.83
1054.83
1056.46
1074.03
1094.04
1114.81
1136.28
1158.39
1181.08
1204.29
1227.95
1252.00
1276.37
1301.00
1325.83
1350.77
1375.76
1400.74
1425.63
1450.38
1474.90
1477.01
1499.13
1523.01
1546.47
20.00
20.00
20.00
33.00
33.00
33.00
33.00
33.00
33.00
33.00
33.00
33.00
33.00
12.00
12.00
12.00
12.00
12.00
12.00
12.00
12.00
12.00
12.00
12.00
12.00
12.00
12.00
12.00
12.00
12.00
12.00
12.00
12.00
12.00
12.00
TFO . Tool .
deg
..........._..._._~._...._........._......... ......_.w..~._..._
0.00 TIP
164.81 KOP
360.00 MWD
0.00 3
0.00 MWD
0.00 MWD
0.00 MWD
360.00 4
292.00 MWD
300.35 MWD
307.65 MWD
313.27 MWD
317.51 MWD
320.65 MWD
322.89 MWD
324.41 MWD
325.28 MWD
325.59 5
270.00 MWD
269.99 MWD
269.97 MWD
269.95 MWD
269.94 MWD
269.92 MWD
269.91 MWD
269.89 MWD
269.88 MWD
269.87 MWD
269.85 MWD
269.84 MWD
269.82 MWD
269.81 MWD
269.80 MWD
269.79 MWD
269.78 MWD
269.77 MWD
269.76 6
270.00 MWD
269.99 MWD
269.98 MWD
__,_,______.____ ,_._.._, u._~_______ '___"'_""_ _,______._.., _..__ __ ______,_.._.,·_______'_n____'.__~___,_____..._.,__,__,____,,__.._. ,_ _ _ .__. __ _,.~ _
) BP )
Baker Hughes INTEQ Planning Repurt
II..
Uk_.
HUGHES
.V ·w,w.·".·.~"·,.,,^..,,.^..,..,, v·'....·'..MMv.'
INTEQ
,-,~~_......---_._~......._-"-,-.,"_"~--_'_'_"_--"_"''''''_"_--'~'_'_"~..,,~_..,--~._,_._.-.__.__.._._._--_......---_...,,-..._~.~_.-.._._._-~..~.
--- ..... -..-.. .~-_._._._._._....._-_._-,-~ --_._-_._~-_._~.._._. ..---..----.-...-.--."-.-...--.- '"'--,----.- .~.......... -------.-.--....-......... ._-~_.._._.._.._.__.._. .......-..-
Company: BP Amoco
Field: Prudhoe Bay
Site: PB E Päd
Well: E,.01
Wellpatb: Plan#5 E-01A
--_._--_._-_..._-~----------------_._.-
Date: .. 2/26/2003 Time: 08:30:1.9 Page: 3
Co~ordinate(N'E) Reference: Well: E-01,. True. Nqrth
Vertical (TYD) Referel1ce: System:. Mean SeaLevel
Section· (VS)Reference: Well (0. OON ,0 .00E,344. OOAzi)
Survey Calculation Method: MinimumCurvature·· Db: Oracle
----------~._-_.~.~_._-_.
----~~
Survey
r·---·
. MD
ft
___.M_____.__.._____._____..__.._._..__.~.._____._._..._
..~.__...~_._._._.__.._.._----_....__._-_._-,,--~..._--..-.-"'..-----....--.-------.
--.-.---.-..-.----.--...--.-.---
Incl Azim
deg deg
SSTVD
ft
N/S
ft
E/W
ft
MapN
ft
MapE
ft
VS
ft
DLS TFO Tool
degl100ft deg
.···..__.._._._..__......__····_~..M...___..._~·...._....._..._._.___..._._..~.._.__~.._._.__...._.......__........._..w.._J_.._.._.._.._._._~._....___...-..-..~_____.__.__.._.~__.._.___..........~_..__.~.._....___........_..__...._~.".'''_'__'_'_'''''__'''_~_._____''___''_~''_'''_'_'''_..._._._.""-.............._.._......_..__..__~_.~_....~.......__._.__......__
10275.00 90.17 319.31 8996.27 2207.16 2003.37 5978061.86 666424.85 1569.45 12.00 269.97 MWD
10300.00 90.17 316.31 8996.19 2225.68 1986.59 5978080.00 666407.67 1591.88 12.00 269.96 MWD
10325.00 90.17 313.31 8996.12 2243.29 1968.85 5978097.23 666389.55 1613.70 12.00 269.96 MWD
10350.00 90.16 310.31 8996.05 2259.96 1950.22 5978113.48 666370.56 1634.86 12.00 269.95 MWD
10375.00 90.16 307.31 8995.98 2275.63 1930.74 5978128.71 666350.74 1655.29 12.00 269.94 MWD
10400.00 90.16 304.31 8995.91 2290.25 1910.47 5978142.89 666330.16 1674.93 12.00 269.93 MWD
10425.00 90.15 301.31 8995.84 2303.80 1889.46 5978155.97 666308.86 1693.74 12.00 269.92 MWD
10450.00 90.15 298.31 8995.77 2316.22 1867.77 5978167.91 666286.90 1711.67 12.00 269.91 MWD
10475.00 90.14 295.31 8995.71 2327.50 1845.46 5978178.70 666264.35 1728.66 12.00 269.90 MWD
10500.00 90.14 292.31 8995.65 2337.59 1822.59 5978188.28 666241.27 1744.66 12.00 269.90 MWD
10525.00 90.13 289.31 8995.59 2346.47 1799.22 5978196.65 666217.71 1759.64 12.00 269.89 MWD
10550.00 90.13 286.31 8995.53 2354.11 1775.42 5978203.77 666193.75 1773.55 12.00 269.88 MWD
10575.00 90.12 283.31 8995.48 2360.50 1751.26 5978209.62 666169.45 1786.35 12.00 269.88 MWD
10600.00 90.11 280.31 8995.43 2365.62 1726.79 5978214.20 666144.88 1798.01 12.00 269.87 MWD
10625.00 90.10 277.31 8995.38 2369.45 1702.09 5978217.49 666120.10 1808.50 12.00 269.86 MWD
10650.00 90.10 274.31 8995.34 2371.98 1677.22 5978219.47 666095.19 1817.79 12.00 269.86 MWD
10665.00 90.09 272.51 8995.32 2372.87 1662.25 5978220.03 666080.20 1822.77 12.00 269.85 TD
. -~ -----_._~._,._.._._,,_... ..-...- ..-..-...._.. -,._.,- "-,,... ..~-,._.,-_.,,- . n.... " _m.....___ _"_,, u_____._ ..._._~___.~.." ....__._..._.. ___"..._..~ ....~.. .__,__.. .._"..._,,_.__ .0_' .__..___ ...._." m_ ._.__.._.___~. ,,_._. -. -"-~.- .-- _.._.~,,-~....--._,..
· '.
J
')
'~
All Measurements are from top of Riser
12/5/2002
'-
<D
en
--
ex:
top of bag
BAG
/'
bttm of bag
middle of slips
Blind/Shears
...............,.........
/.
TOTs
middle of pipes
2 -3/8" com bi ram/s Ii ps ..../.................
--
~
middle of flow cross
Mud Cross
Mud Cross
~
'---'
middle of blind/shears
2-3/8" x 3·1/2" VBR pipe rams ......,.............,...
TOTs
/
middle of pipe/slips
2 -3/8" com bi ram/s Ii PS ..........................
Flow Tee
,
~ 0 K6 ì C
P055003
DATE
12/19/2002
CHECK NO.
P055003
DATE
INVOICE I CREDIT MEMO
DESCRIPTION
GROSS
VENDOR
DISCOUNT
NET
12/19/2002 INV# CK121702L
PERMIT TO DRILL FEE
H
bJ 0'\ Pr
R~ L r F~ \1 E
~r:._'f~n"" "'"'
F[B, <
,) !U'" fì ('
L.' \i,J
A:aska on & ~, GO\mnìSS!.Üf(
AriChürç(nf~
~
THE ATTACHED CHECK IS IN PAYMENT FOR ITEMS DESCRIBED ABOVE.
TOTAL ~
BP EXPLORATION, (ALASKA) INC.
PRUDHOE BAY UNIT
PO BOX 196612
ANCHORAGE, AK99519-6612
NATIONAL CITY BANK
Ashland,Ohio
56-389
41'2"""
No. P 055003
CONSOLIDATED COMMERCIAL ACCOUNT
TO THE
ORDER
OF:
ALASKA ºIL ~GÂS CÖNSERVI&TION
333 W 7TH A\lENtJE
SUITE 1 00 .,~~..~~..~ .~~ ~~. .~'..
ANCHORA<3E: ÄK 9ØS01
PAY:
***************$100.00***
- __u. ."
:." -:: - ..'-.
. .--: "'_..: .. ;..---
. _ d- _.'."
> NqtvftUoA,fn:ö 1 ~DJ~O ~~ .r:.';i. . ,,¡,,'> ..... .1'!1.
.~;,:.:: ;}S·:::;·::::::::~~:::<"fP¡g~::;:~·:f:~·::~X:?~¥:;~~·~::~:~~~~ :.:~
. ~...... .~... . .. n. .~'..;...'. .....t;<..-. ...... ........ ......
(~i~:~'i'>"~ . ~ '., ~ ~ .~. ~ . ~ nn~i":·.~·;.~:\~ :.~.., : ~ .":"\~ :
~.i·~· );~~':~:~::: :~~}\~... . :'G}~¡~~~~;~~(~~~i?~:~~?:~;~ ;·~··::¡:::·L
~
II· 0 5 5 0 0 j II· I : 0 1. ¡. 2 0 j 8 ~ 5 I: 0 ¡. 2 r a ., b III
)
)
TRANSMIT AL LETTER CHECK LIST
CIRCLE APPROPRIATE LETTERJP ARA GRAPH S TO
BE INCLUDED IN TRANSMtTTAL LETTER
WELL NAME (?/5d FiJ/R
PTD# 2-D 3-- {) 3 :3
CHECK WHAT
APPLIES
ADD-ONS
(OPTIONS)
MVL TI
LATERAL
(If API number
last two (2) digits
are between 60-69)
PILOT
(PH)
"CLUE"
The permit is for a new wellbore segment of
existing well
Permit No, API No.
Production should continue to· be reported as
a function· of the original API number stated
above.
HOLE In accordance with 20 AAC 25.005(t), all
records, data and logs acquired for the pilot
hole must be clearly differentiated in both
name (name on permit plus PH)
and API number (50
70/80) from records, data and logs acquired
for well (name on permit).
SPACING
EXCEPTION
DRY DITCH
SAMPLE
Rev: 07/10/02
C\j ody\templates
The permit is approved subject to full
compliance with 20 AAC 25.055. Approval to
perforate and produce is contingent upon
issuance of a conservation order approving a
spacing exception.
(Company Name) assumes the liability of any
protest to the spacing exception that may
occur.
All dry ditch sample sets submitted to the
Commission must be in no greater than 30'
sample intervals from below the permafrost
or from where samples are first caught and
10' sample intervals through target zones.
WELLPERMITCHECKLlST COMPANY ~f/K/I WELLNAME¡?~¿( ~-z?IJ1PROGRAM: Exp_ Dev~ Redrll /' Re-Enter_ Serv_ Wellboreseg_
FIELD & POOL C:, t(O/SD INIT CLASS A£v / - 01 L.,. GEOL AREA ~9() UNIT# 0 II h Sð ON/OFF SHORE ()n
ADMINISTRATION 1. Permit fee attached. . . . . . . . . . . . . . . . . . . . . . . N
2. Lease number appropriate. . . . . . . . . . . . . . . . . . . N
3. Unique well name and number. . . . . . . . . . . . . . . . . N
4. Well located in a defined pool.. . . . . . . . . . . . . . . . . N
5. Well located proper distance from drilling unit boundary. N
6. Well located proper distance from other wells.. . . . . . . . . N
7. Sufficient acreage available in drilling unit.. . . . . . . . . . . N
l'A 8. If deviated, is wellbore plat included.. . . . . . . . . . . . . . N
~ 3·3·DB 9. Operator only affected party.. . . . . . . . . . . . . . . . . . N
10. Operator has appropriate bond in force. . . . . . . . . . . . . N
11. Permit can be issued without conservation order. . . . . . . . éi) N
12. Permit can be issued without administrative approval.. . . . . OJ N
(Service Well Only) 13. Well located wlin area & strata authorized by injection order #-----AIA Y N ~
(Service Well Only) 14. All wells wlin ~ mile area of review identified. . . . . . . . .. A/Il-Y N
ENGINEERING 15. Conductor string provided. . . . . . . . . . . . . . . . . . . ¥--N-
16. Surface casing protects all known USDWs. . . . . . . . . . ~ _!'L.¡Ú/Æ-
17. CMT vol adequate to circulate on conductor & surf csg. . . . ~
18. CMT vol adequate to tie-in long string to surf csg. . . . . . . . ~ N
19. CMT will cover all known productive horizons. . . . . . . . . . . . NN
20. Casing designs adequate for C, T, B & permafrost. . . . . . .
21. Adequate tankage or reserve pit.. . . . . . .. . . . . . . . . ~ N C,TD U.
22. If a re-drill, has a 10-403 for abandonment been approved. .. -* 'h... NN
23. Adequate wellbore separation proposed.. . . . . . . . . . . . éIi
24. If diverter required, does it meet regulations. . . . . . . ... . Iy N ^'/A-
25. Drilling fluid program schematic & equip list adequate. . . . . ... NN m ðV/- 111. ~( -S..f i7 P P7, .
26. BOPEs, do they meet regulation. . . . . . . . . . . . . . . . ) r j t I
27. BOPE press rating appropriate; test to3Ç' 0 0 psig. N fYl ç I '2 Z. T '-( P 5 t ~
. I 28. Choke manifold complies w/API RP-53 (May 84). . . . . . . . N
W~ "3/3 () ~ 29. Work will occur without operation shutdown. . . . . . . . . . . ' þ!-j
30. Is presence of H2S gas probable.. . . . . . . . . . . . . . . . ~ ~ _ J IL
(Service Well Only) 31. Mechanical condition of wells within AOR verified. . . . . . . . --r--n- ~\,(.II'
GEOLOGY 32. Permit can be issued wlo hydrogen sulfide measures. . .. Æ /C?,P~ ~S ~S':~ ~ ~-0Z3. led 4> "-
APPR DATE 33. Data presented on potential overpressure zones. . . . . . . . Y ~~ .Þ~/,LcI<-.cI. K~ v.ø,'- ~Uf"4- ~ Z Z-f7fd ?mt..J.
~,,,,- 3.3- .CY2 34. Seismic anal~~is of shallo~ gas zones. . . . . . . . . . . .. J. N
1) :;.,.J 35. Seabed condition survey (If off-shore). . . . . .. ...... 1'1) Y N
Exploratory Only) 36. Contact namelphone for weekly progress reports. ...... Y N
APPR
DATE
APPR
DATE
(
GEOLOGY: PETROLEUM ENGINEERING: RESERVOIR ENGINEERING UIC ENGINEER COM~~ Commentsllnstructions:
RPC TM JH JR SP 75" . ~,~'
- RR ß:~
SF~ WA / MW DS (þ'j- tJ1f~
Rev: 2/25/03
\well.J>erm it_checklist
)
)
Well History File
APPENDIX
Information of detailed nature that is not
particularly germane to the Well Permitting Process
but is part of the history file.
To improve the readability of the Well History file and to
simplify finding information, information of this
nature is accumulated at the end of the file under APPENDIX.
No special effort has been made to chronologically
organize this category of information.
')
)
êW3-D33·
I , 5'\,?
Sperry-Sun Drilling Services
LIS Scan Utility
$Revision: 3 $
LisLib $Revision: 4 $
Tue Jul 08 15:24:36 2003
Reel Header
Service name............ .LISTPE
Da te. . . . . . . . . . . . . . . . . . . . . 03/07/08
Origin. . . . . . . . . . . . . . . . . . . STS
Reel Name............... . UNKNOWN
Continuation Number..... .01
Previous Reel Name...... .UNKNOWN
Comments................ .STS LIS Writing Library. Scientific
Technical Services
Tape Header
Service name............ .LISTPE
Date.................... .03/07/08
Origin.................. .STS
Tape Name............... .UNKNOWN
Continuation Number..... .01
Previous Tape Name...... .UNKNOWN
Comments................ .STS LIS Writing Library. Scientific
Technical Services
Physical EOF
Comment Record
TAPE HEADER
Prudhoe Bay
MWD/MAD LOGS
#
WELL NAME:
API NUMBER:
OPERATOR:
LOGGING COMPANY:
TAPE CREATION DATE:
#
JOB DATA
E-OIA
500292016601
BP Exploration (Alaska) Inc.
Sperry-Sun Drilling Services
08-JUL-03
JOB NUMBER:
LOGGING ENGINEER:
OPERATOR WITNESS:
MWD RUN 8
MW0002365920
B. JAHN
SARBER/KOLST
MWD RUN 9
MW0002365920
B. JAHN
SARBER/KOLST
MWD RUN 10
MW0002365920
B. JAHN
J. EGBAJIMBA
JOB NUMBER:
LOGGING ENGINEER:
OPERATOR WITNESS:
MWD RUN 11
MW0002365920
B. JAHN
J. EGBAJIMBA
MWD RUN 12
MW0002365920
B. JAHN
J. EGBAJIMBA
#
SURFACE LOCATION
SECTION:
TOWNSHIP:
RANGE:
FNL:
FSL:
6
IIN
14E
1253
)
)
FEL:
FWL:
ELEVATION (FT FROM MSL 0)
KELLY BUSHING:
DERRICK FLOOR:
GROUND LEVEL:
502
55.02
28.58
#
WELL CASING RECORD
1ST STRING
2ND STRING
3RD STRING
PRODUCTION STRING
OPEN HOLE CASING DRILLERS
BIT SIZE (IN) SIZE (IN) DEPTH (FT)
4.125 7.000 9255.0
#
REMARKS:
1. ALL DEPTHS ARE MEASURED DEPTHS UNLESS OTHERWISE
NOTED.
2. ALL VERTICAL DEPTHS ARE TRUE VERTICAL DEPTHS - SUBSEA
(TVDSS) .
3. MWD RUNS 8 - 12 WERE DIRECTIONAL WITH GAMMA MODULE
(GM) UTILIZING
GEIGER-MUELLER TUBE DETECTORS.
4. LOG AND DIGITAL (LDWG) DATA ONLY WERE DEPTH SHIFTED
TO A SCHLUMBERGER
MCNL GAMMA RAY RUN IN E-01A ON 12 APRIL 2003. THESE
PDC DATA WERE
RECEIVED VIA E-MAIL FROM D. SCHNORR (BP EXPLORATION)
ON 1 JULY 2003.
ALL HEADER DATA RETAIN ORIGINAL DRILLER'S DEPTH
REFERENCES.
5. MWD RUNS 8-12 REPRESENT WELL E-01A WITH API #
50-029-20166-01.
THIS WELL REACHED A TOTAL DEPTH (TD) OF 10737' MD /
8988' TVDSS.
SROP = SMOOTHED RATE OF PENETRATION WHILE DRILLING
SGRC = SMOOTHED GAMMA RAY - GEIGER-MUELLER TUBE
DETECTORS
$
File Header
Service name............ .STSLIB.001
Service Sub Level Name. . .
Version Number.......... .1.0.0
Date of Generation..... ..03/07/08
Maximum Physical Record..65535
File Type............... .LO
Previous File Name...... .STSLIB.OOO
Comment Record
FILE HEADER
FILE NUMBER: 1
EDITED MERGED MWD
Depth shifted and clipped curves; all bit runs merged.
DEPTH INCREMENT: .5000
#
FILE SUMMARY
PBU TOOL CODE
GR
ROP
$
')
)
START DEPTH
9164.0
9271.0
STOP DEPTH
10713.5
10740.0
#
BASELINE CURVE FOR SHIFTS:
CURVE SHIFT DATA (MEASURED DEPTH)
--------- EQUIVALENT UNSHIFTED DEPTH -
BASELINE DEPTH
9166.0
9189.5
9197.0
9231.5
9240.0
9243.5
9247.5
9258.5
9261.0
9264.0
9272.5
9281.0
9290.5
9310.5
9313.5
9316.0
9325.0
9339.5
9345.5
9348.0
9350.5
9362.5
9365.5
9379.0
9390.5
9393.0
9395.0
9408.5
9410.0
9426.0
9439.5
9448.0
9460.0
9462.5
9471.5
9475.5
9478.0
9492.0
9503.0
9509.5
9520.0
9523.5
9525.5
9534.0
9539.5
9542.5
9549.0
9558.5
9576.0
9582.5
GR
9164.0
9187.5
9195.5
9229.5
9238.0
9241.0
9246.0
9259.0
9261.0
9263.5
9273.5
9279.5
9291.0
9311.0
9314.5
9317.0
9326.5
9341.5
9347.0
9349.0
9352.0
9364.0
9367.0
9380.5
9392.0
9394.0
9396.5
9410.0
9411.5
9427.5
9441.0
9448.5
9459.5
9462.0
9472.0
9475.5
9478.0
9490.0
9500.0
9503.0
9518.0
9521.5
9524.5
9532.0
9534.5
9537.5
9544.5
9556.0
9573.0
9580.0
9592.5
9601.0
9620.5
9631.0
9669.0
9715.5
9723.5
9744.0
9767.5
9801.5
9854.5
9862.5
9885.0
9920.0
9964.0
9969.5
10032.0
10047.5
10074.5
10105.5
10133.5
10174.5
10201.0
10208.0
10215.5
10228.5
10238.0
10243.5
10277.5
10293.5
10320.0
10334.5
10364.5
10392.0
10403.0
10409.5
10429.0
10441.5
10455.0
10482.5
10519.0
10525.5
10535.0
10570.0
10589.0
10595.5
10622.5
10662.0
10740.0
$
#
MERGED DATA SOURCE
PBU TOOL CODE
MWD
MWD
MWD
MWD
MWD
$
#
REMARKS:
)
9593.5
9600.5
9619.5
9628.5
9666.5
9713.5
9720.0
9741.0
9761.0
9797.0
9852.5
9860.5
9884.5
9916.0
9962.0
9967.0
10029.5
10044.5
10074.0
10105.0
10133.5
10174.0
10201.0
10208.0
10215.0
10229.0
10237.0
10243.0
10281.0
10295.0
10321.0
10337.0
10364.5
10392.0
10402.5
10410.0
10428.5
10442.0
10454.5
10480.5
10520.5
10528.0
10534.5
10570.5
10589.5
10596.5
10623.5
10659.0
10737.0
BIT RUN NO
8
9
10
11
12
MERGED MAIN PASS.
MERGE TOP
9164.0
9476.0
9517.0
9799.5
10113.0
")
MERGE BASE
9476.0
9517.0
9799.5
10113.0
10737.0
)
)
$
#
Data Format Specification Record
Data Record Type..................O
Data Specification Block Type.....O
Logging Direction................ . Down
Optical log depth units.......... .Feet
Data Reference Point............. . Undefined
Frame Spacing.................... .60 .1IN
Max frames per record............ . Undefined
Absent value. . . . . . . . . . . . . . . . . . . . . . -999
Depth Units. . . . . . . . . . . . . . . . . . . . . . .
Datum Specification Block sub-type...O
Name Service Order
DEPT
ROP MWD
GR MWD
Units Size Nsam Rep Code Offset Channel
FT 4 1 68 0 1
FT/H 4 1 68 4 2
API 4 1 68 8 3
First
Last
Name Service Unit Min Max Mean Nsam Reading
Reading
DEPT FT 9164 10740 9952 3153 9164
10740
ROP MWD FT/H 0.04 527.78 81.5245 2939 9271
10740
GR MWD API 15.56 450.32 43.128 3100 9164
10713.5
First Reading For Entire File......... .9164
Last Reading For Entire File.......... .10740
File Trailer
Service name............ .STSLIB.001
Service Sub Level Name...
Version Number.......... .1.0.0
Date of Generation...... .03/07/08
Maximum Physical Record. .65535
File Type............... .LO
Next File Name.......... .STSLIB.002
Physical EOF
File Header
Service name........ ... ..STSLIB.002
Service Sub Level Name...
Version Number.......... .1.0.0
Date of Generation...... .03/07/08
Maximum Physical Record. .65535
File Type............... .LO
Previous File Name...... .STSLIB.OOl
Comment Record
FILE HEADER
)
FILE NUMBER:
RAW MWD
Curves and log
BIT RUN NUMBER:
DEPTH INCREMENT:
#
FILE SUMMARY
VENDOR TOOL CODE
GR
ROP
$
2
')
header data for each bit run in separate files.
8
.5000
START DEPTH
9164.0
9272.0
STOP DEPTH
9448.0
9476.0
#
LOG HEADER DATA
DATE LOGGED:
SOFTWARE
SURFACE SOFTWARE VERSION:
DOWNHOLE SOFTWARE VERSION:
DATA TYPE (MEMORY OR REAL-TIME) :
TD DRILLER (FT):
TOP LOG INTERVAL (FT):
BOTTOM LOG INTERVAL (FT):
BIT ROTATING SPEED (RPM):
HOLE INCLINATION (DEG
MINIMUM ANGLE:
MAXIMUM ANGLE:
#
TOOL STRING (TOP TO BOTTOM)
VENDOR TOOL CODE TOOL TYPE
GM Dual GR
$
#
BOREHOLE AND CASING DATA
OPEN HOLE BIT SIZE (IN):
DRILLER'S CASING DEPTH (FT):
#
BOREHOLE CONDITIONS
MUD TYPE:
MUD DENSITY (LB/G):
MUD VISCOSITY (S):
MUD PH:
MUD CHLORIDES (PPM):
FLUID LOSS (C3):
RESISTIVITY (OHMM) AT TEMPERATURE (DEGF)
MUD AT MEASURED TEMPERATURE (MT):
MUD AT MAX CIRCULATING TERMPERATURE:
MUD FILTRATE AT MT:
MUD CAKE AT MT:
#
NEUTRON TOOL
MATRIX:
MATRIX DENSITY:
HOLE CORRECTION (IN):
#
TOOL STANDOFF (IN):
EWR FREQUENCY (HZ):
#
REMARKS:
$
#
Data Format Specification Record
Data Record Type..................O
08 -APR- 03
Insite
4.3
Memory
9475.0
9271.0
9475.0
23.2
39.8
TOOL NUMBER
82758
4.125
9255.0
Flo Pro
8.70
65.0
9.0
21000
.0
.000
.000
.000
.000
.0
120.2
.0
.0
)
')
Data Specification Block Type.....O
Logging Direction................ . Down
Optical log depth units.......... .Feet
Data Reference Point............. .Undefined
Frame Spacing.................... .60 .1IN
Max frames per record............ .Undefined
Absent value. . . . . . . . . . . . . . . . . . . . . . -999
Depth Units. . . . . . . . . . . . . . . . . . . . . . .
Datum Specification Block sub-type...O
Name Service Order
DEPT
ROP MWD080
GR MWD080
Units Size Nsam Rep Code Offset Channel
FT 4 1 68 0 1
FT/H 4 1 68 4 2
API 4 1 68 8 3
First
Last
Name Service Unit Min Max Mean Nsam Reading
Reading
DEPT FT 9164 9476 9320 625 9164
9476
ROP MWD080 FT/H 0.48 402.56 52.0229 409 9272
9476
GR MWD080 API 20.54 450.32 98.4132 569 9164
9448
First Reading For Entire File......... .9164
Last Reading For Entire File.......... .9476
File Trailer
Service name............ .STSLIB.002
Service Sub Level Name...
Version Number.......... .1.0.0
Date of Generation..... ..03/07/08
Maximum Physical Record. .65535
F i 1 e Type................ LO
Next File Name.......... .STSLIB.003
Physical EOF
File Header
Service name............ .STSLIB.003
Service Sub Level Name...
Version Number.......... .1.0.0
Date of Generation. .... ..03/07/08
Maximum Physical Record. .65535
File Type................LO
Previous File Name...... .STSLIB.002
Comment Record
FILE HEADER
FILE NUMBER:
RAW MWD
Curves and log
BIT RUN NUMBER:
3
header data for each bit run in separate files.
9
')
DEPTH INCREMENT:
#
FILE SUMMARY
VENDOR TOOL CODE
GR
ROP
$
.5000
START DEPTH
9448.5
9476.5
STOP DEPTH
9489.0
9517.0
#
LOG HEADER DATA
DATE LOGGED:
SOFTWARE
SURFACE SOFTWARE VERSION:
DOWNHOLE SOFTWARE VERSION:
DATA TYPE (MEMORY OR REAL-TIME) :
TD DRILLER (FT):
TOP LOG INTERVAL (FT):
BOTTOM LOG INTERVAL (FT):
BIT ROTATING SPEED (RPM):
HOLE INCLINATION (DEG
MINIMUM ANGLE:
MAXIMUM ANGLE:
#
TOOL STRING (TOP TO BOTTOM)
VENDOR TOOL CODE TOOL TYPE
GM Dual GR
$
#
BOREHOLE AND CASING DATA
OPEN HOLE BIT SIZE (IN):
DRILLER'S CASING DEPTH (FT):
#
BOREHOLE CONDITIONS
MUD TYPE:
MUD DENSITY (LB/G):
MUD VISCOSITY (S):
MUD PH:
MUD CHLORIDES (PPM):
FLUID LOSS (C3):
RESISTIVITY (OHMM) AT TEMPERATURE (DEGF)
MUD AT MEASURED TEMPERATURE (MT):
MUD AT MAX CIRCULATING TERMPERATURE:
MUD FILTRATE AT MT:
MUD CAKE AT MT:
#
NEUTRON TOOL
MATRIX:
MATRIX DENSITY:
HOLE CORRECTION (IN):
#
TOOL STANDOFF (IN):
EWR FREQUENCY (HZ):
#
REMARKS:
$
#
Data Format Specification Record
Data Record Type..................O
Data Specification Block Type.....O
Logging Direction. . . . . . . . . . . . . . . . . Down
Optical log depth units.......... .Feet
Data Reference Point............. .Undefined
)
09-APR- 03
Insite
4.3
Memory
9517.0
9475.0
9517.0
42.6
42.6
TOOL NUMBER
82758
4.125
9255.0
Flo Pro
8.60
65.0
9.5
21000
1.0
.000
.000
.000
.000
.0
130.8
.0
.0
)
)
Frame Spacing.................... .60 .1IN
Max frames per record............ .Undefined
Absent value. . . . . . . . . . . . . . . . . . . . . . -999
Depth Units. . . . . . . . . . . . . . . . . . . . . . .
Datum Specification Block sub-type. ..0
Name Service Order
DEPT
ROP MWD090
GR MWD090
Units Size Nsam Rep Code Offset Channel
FT 4 1 68 0 1
FT/H 4 1 68 4 2
API 4 1 68 8 3
First
Last
Name Service Unit Min Max Mean Nsam Reading
Reading
DEPT FT 9448.5 9517 9482.75 138 9448.5
9517
ROP MWD090 FT/H 0.04 76.25 20.2052 82 9476.5
9517
GR MWD090 API 20.47 143.15 38.9799 82 9448.5
9489
First Reading For Entire File......... .9448.5
Last Reading For Entire File.......... .9517
File Trailer
Service name............ .STSLIB.003
Service Sub Level Name...
Version Number.......... .1.0.0
Date of Generation...... .03/07/08
Maximum Physical Record. .65535
File Type................ LO
Next File Name.......... .STSLIB.004
Physical EOF
File Header
Service name............ .STSLIB.004
Service Sub Level Name...
Version Number.......... .1.0.0
Date of Generation...... .03/07/08
Maximum Physical Record. .65535
File Type................ LO
Previous File Name...... .STSLIB.003
Comment Record
FILE HEADER
FILE NUMBER:
RAW MWD
Curves and log
BIT RUN NUMBER:
DEPTH INCREMENT:
#
FILE SUMMARY
VENDOR TOOL CODE
4
header data for each bit run in separate files.
10
.5000
START DEPTH
STOP DEPTH
)
GR
ROP
$
9489.5
9517.5
9772.5
9799.5
#
LOG HEADER DATA
DATE LOGGED:
SOFTWARE
SURFACE SOFTWARE VERSION:
DOWNHOLE SOFTWARE VERSION:
DATA TYPE (MEMORY OR REAL-TIME) :
TD DRILLER (FT):
TOP LOG INTERVAL (FT):
BOTTOM LOG INTERVAL (FT):
BIT ROTATING SPEED (RPM):
HOLE INCLINATION (DEG
MINIMUM ANGLE:
MAXIMUM ANGLE:
#
TOOL STRING (TOP TO BOTTOM)
VENDOR TOOL CODE TOOL TYPE
GM Dual GR
$
#
BOREHOLE AND CASING DATA
OPEN HOLE BIT SIZE (IN):
DRILLER'S CASING DEPTH (FT):
#
BOREHOLE CONDITIONS
MUD TYPE:
MUD DENSITY (LB/G):
MUD VISCOSITY (S):
MUD PH:
MUD CHLORIDES (PPM):
FLUID LOSS (C3):
RESISTIVITY (OHMM) AT TEMPERATURE (DEGF)
MUD AT MEASURED TEMPERATURE (MT):
MUD AT MAX CIRCULATING TERMPERATURE:
MUD FILTRATE AT MT:
MUD CAKE AT MT:
#
NEUTRON TOOL
MATRIX:
MATRIX DENSITY:
HOLE CORRECTION (IN):
#
TOOL STANDOFF (IN):
EWR FREQUENCY (HZ):
#
REMARKS:
$
#
Data Format Specification Record
Data Record Type..................O
Data Specification Block Type.....O
Logging Direction............. ... . Down
Optical log depth units.......... .Feet
Data Reference Point............. . Undefined
Frame Spacing.................... .60 .1IN
Max frames per record............ .Undefined
Absent value..... . . . . . . . . . . . . . . . . . -999
Depth Units. . . . . . . . . . . . . . . . . . . . . . .
)
09-APR-03
Insite
4.3
Memory
9801.0
9517.0
9801.0
43.0
90.0
TOOL NUMBER
82758
4.125
9255.0
Flo-Pro
8.60
56.0
9.0
21000
10.4
.000
.000
.000
.000
.0
130.8
.0
.0
')
')
Datum Specification Block sub-type...O
Name Service Order Units Size Nsam Rep Code Offset Channel
DEPT FT 4 1 68 0 1
ROP MWDI00 FT/H 4 1 68 4 2
GR MWDI00 API 4 1 68 8 3
First
Last
Name Service Unit Min Max Mean Nsam Reading
Reading
DEPT FT 9489.5 9799.5 9644.5 621 9489.5
9799.5
ROP MWDI00 FT/H 2.55 401.97 79.5732 565 9517.5
9799.5
GR MWDI00 API 16.87 59.11 27.7303 567 9489.5
9772.5
First Reading For Entire File......... .9489.5
Last Reading For Entire File.......... .9799.5
File Trailer
Service name............ .STSLIB.004
Service Sub Level Name...
Version Number.......... .1.0.0
Date of Generation...... .03/07/08
Maximum Physical Record. .65535
F i 1 e Type................ LO
Next File Name.......... .STSLIB.005
Physical EOF
File Header
Service name............ .STSLIB.005
Service Sub Level Name...
Version Number.......... .1.0.0
Date of Generation..... ..03/07/08
Maximum Physical Record. .65535
File Type................ LO
Previous File Name..... ..STSLIB.004
Comment Record
FILE HEADER
FILE NUMBER:
RAW MWD
Curves and log
BIT RUN NUMBER:
DEPTH INCREMENT:
#
FILE SUMMARY
VENDOR TOOL CODE
GR
ROP
$
5
header data for each bit run in separate files.
11
.5000
START DEPTH
9773.0
9800.0
STOP DEPTH
10086.0
10113.0
#
)
LOG HEADER DATA
DATE LOGGED:
SOFTWARE
SURFACE SOFTWARE VERSION:
DOWNHOLE SOFTWARE VERSION:
DATA TYPE (MEMORY OR REAL-TIME) :
TD DRILLER (FT):
TOP LOG INTERVAL (FT):
BOTTOM LOG INTERVAL (FT):
BIT ROTATING SPEED (RPM):
HOLE INCLINATION (DEG
MINIMUM ANGLE:
MAXIMUM ANGLE:
#
TOOL STRING (TOP TO BOTTOM)
VENDOR TOOL CODE TOOL TYPE
GM Dual GR
$
#
BOREHOLE AND CASING DATA
OPEN HOLE BIT SIZE (IN):
DRILLER'S CASING DEPTH (FT):
#
BOREHOLE CONDITIONS
MUD TYPE:
MUD DENSITY (LB/G):
MUD VISCOSITY (S):
MUD PH:
MUD CHLORIDES (PPM):
FLUID LOSS (C3):
RESISTIVITY (OHMM) AT TEMPERATURE (DEGF)
MUD AT MEASURED TEMPERATURE (MT):
MUD AT MAX CIRCULATING TERMPERATURE:
MUD FILTRATE AT MT:
MUD CAKE AT MT:
#
NEUTRON TOOL
MATRIX:
MATRIX DENSITY:
HOLE CORRECTION (IN):
#
TOOL STANDOFF (IN):
EWR FREQUENCY (HZ):
#
REMARKS:
$
#
Data Format Specification Record
Data Record Type..................O
Data Specification Block Type.....O
Logging Direction................ . Down
Optical log depth units.......... .Feet
Data Reference Point............. . Undefined
Frame Spacing.................... .60 .1IN
Max frames per record............ . Undefined
Absent value............... . . . . . . . -999
Depth Uni t s . . . . . . . . . . . . . . . . . . . . . . .
Datum Specification Block sub-type...O
)
10-APR-03
Insite
4.3
Memory
10114.0
9801.0
10114.0
88.2
90.9
TOOL NUMBER
93091
4.125
9255.0
Flo Pro
8.60
50.0
9.0
21000
8.8
.000
.000
.000
.000
.0
131.2
.0
.0
Name Service Order Units Size Nsam Rep Code Offset Channel
DEPT FT 4 1 68 0 1
)
')
ROP MWD110
GR MWD110
FT/H
API
4
4
1 68
1 68
4
8
2
3
First
Last
Name Service Unit Min Max Mean Nsam Reading
Reading
DEPT FT 9773 10113 9943 681 9773
10113
ROP MWD110 FT/H 0.37 145.29 88.7889 627 9800
10113
GR MWD110 API 15.56 32.84 25.162 627 9773
10086
First Reading For Entire File......... .9773
Last Reading For Entire File.......... .10113
File Trailer
Service name............ .STSLIB.005
Service Sub Level Name...
Version Number.......... .1.0.0
Date of Generation...... .03/07/08
Maximum Physical Record. .65535
F i 1 e Type................ LO
Next File Name.......... .STSLIB.006
Physical EOF
File Header
Service name............ .STSLIB.006
Service Sub Level Name...
Version Number.......... .1.0.0
Date of Generation...... .03/07/08
Maximum Physical Record. .65535
F i 1 e Type................ LO
Previous File Name...... .STSLIB.005
Comment Record
FILE HEADER
FILE NUMBER:
RAW MWD
Curves and log
BIT RUN NUMBER:
DEPTH INCREMENT:
#
FILE SUMMARY
VENDOR TOOL CODE
GR
ROP
$
6
header data for each bit run in separate files.
12
.5000
START DEPTH
10086.5
10113.5
STOP DEPTH
10710.5
10737.0
#
LOG HEADER DATA
DATE LOGGED:
SOFTWARE
SURFACE SOFTWARE VERSION:
10 -APR-03
Insite
)
DOWNHOLE SOFTWARE VERSION:
DATA TYPE (MEMORY OR REAL-TIME) :
TD DRILLER (FT):
TOP LOG INTERVAL (FT):
BOTTOM LOG INTERVAL (FT):
BIT ROTATING SPEED (RPM):
HOLE INCLINATION (DEG
MINIMUM ANGLE:
MAXIMUM ANGLE:
#
TOOL STRING (TOP TO BOTTOM)
VENDOR TOOL CODE TOOL TYPE
GM Dual GR
$
#
BOREHOLE AND CASING DATA
OPEN HOLE BIT SIZE (IN):
DRILLER'S CASING DEPTH (FT):
#
BOREHOLE CONDITIONS
MUD TYPE:
MUD DENSITY (LB/G):
MUD VISCOSITY (S):
MUD PH:
MUD CHLORIDES (PPM):
FLUID LOSS (C3):
RESISTIVITY (OHMM) AT TEMPERATURE (DEGF)
MUD AT MEASURED TEMPERATURE (MT):
MUD AT MAX CIRCULATING TERMPERATURE:
MUD FILTRATE AT MT:
MUD CAKE AT MT:
#
NEUTRON TOOL
MATRIX:
MATRIX DENSITY:
HOLE CORRECTION (IN):
#
TOOL STANDOFF (IN):
EWR FREQUENCY (HZ):
#
REMARKS:
$
#
Data Format Specification Record
Data Record Type..................O
Data Specification Block Type.....O
Logging Direction. . . . . . . . . . . . . . . . . Down
Optical log depth units.......... .Feet
Data Reference Point............. .Undefined
Frame Spacing.................... .60 .1IN
Max frames per record............ . Undefined
Absent value. . . . . . . . . . . . . . . . . . . . . . -999
Depth Uni t s . . . . . . . . . . . . . . . . . . . . . . .
Datum Specification Block sub-type. ..0
')
4.3
Memory
10737.0
10114.0
10737.0
86.7
92.2
TOOL NUMBER
93091
4.125
9255.0
FIo Pro
8.70
.0
9.0
21000
7.6
.000
.000
.000
.000
.0
144.9
.0
.0
Name Service Order
DEPT
ROP MWD120
GR MWD120
Units Size Nsam Rep Code Offset Channel
FT 4 1 68 0 1
FT/H 4 1 68 4 2
API 4 1 68 8 3
')
)
First
Last
Name Service Unit Min Max Mean Nsam Reading
Reading
DEPT FT 10086.5 10737 10411.8 1302 10086.5
10737
ROP MWD120 FT/H 0.96 527.78 92.8681 1248 10113.5
10737
GR MWD120 API 17.4 153.98 34.7971 1249 10086.5
10710.5
First Reading For Entire File......... .10086.5
Last Reading For Entire File.......... .10737
File Trailer
Service name............ .STSLIB.006
Service Sub Level Name.. .
Version Number.......... .1.0.0
Date of Generation...... .03/07/08
Maximum Physical Record. .65535
File Type. . . . . . . . . . . . . . . .LO
Next File Name.......... .STSLIB.007
Physical EOF
Tape Trailer
Service name............ .LISTPE
Da te. . . . . . . . . . . . . . . . . . . . . 03/07/08
Origin. . . . . . . . . . . . . . . . . . . STS
Tape Name............... . UNKNOWN
Continuation Number..... .01
Next Tape Name.......... .UNKNOWN
Comments................ .STS LIS Writing Library. Scientific
Technical Services
Reel Trailer
Service name............ .LISTPE
Da te . . . . . . . . . . . . . . . . . . . . . 03/07 /08
Origin. . . . . . . . . . . . . . . . . . . STS
Reel Name............... . UNKNOWN
Continuation Number..... .01
Next Reel Name.......... . UNKNOWN
Comments................ .STS LIS Writing Library. Scientific
Technical Services
Physical EOF
Physical EOF
End Of LIS File
)
")
::A03-DS3
I t g I tf
Sperry-Sun Drilling Services
LIS Scan Utility
$Revision: 3 $
LisLib $Revision: 4 $
Tue Jul 08 14:05:31 2003
Reel Header
Service name............ .LISTPE
Date. . . . . . . . . . . . . . . . . . . . .03/07/08
Origin. . . . . . . . . . . . . . . . . . . STS
Reel Name............... . UNKNOWN
Continuation Number..... .01
Previous Reel Name...... . UNKNOWN
Comments................ .STS LIS Writing Library. Scientific
Technical Services
Tape Header
Service name......... . . . .LISTPE
Date.................... .03/07/08
Origin. . . . . . . . . . . . . . . . . . . STS
Tape Name............... . UNKNOWN
Continuation Number..... .01
Previous Tape Name...... . UNKNOWN
Comments................ .STS LIS Writing Library. Scientific
Technical Services
Physical EOF
Comment Record
TAPE HEADER
Prudhoe Bay
MWD/MAD LOGS
#
WELL NAME:
API NUMBER:
OPERATOR:
LOGGING COMPANY:
TAPE CREATION DATE:
#
JOB DATA
E-01Apb1
500292016670
BP Exploration (Alaska) Inc.
Sperry-Sun Drilling Services
08-JUL-03
JOB NUMBER:
LOGGING ENGINEER:
OPERATOR WITNESS:
MWD RUN 1
MW0002365920
S. LATZ
SARBER/MCCAR
MWD RUN 2
MW0002365920
S. LATZ
SARBER/KOLST
MWD RUN 3
MW0002365920
S. LATZ
SARBER/KOLST
JOB NUMBER:
LOGGING ENGINEER:
OPERATOR WITNESS:
MWD RUN 4
MW0002365920
S. LATZ
SARBER/KOLST
MWD RUN 5
MW0002365920
S. LATZ
SARBER/KOLST
MAD RUN 5
MW0002365920
S. LATZ
SARBER/KOLST
#
SURFACE LOCATION
SECTION:
TOWNSHIP:
RANGE:
FNL:
FSL:
6
11N
14E
1253
)
)
FEL:
FWL:
ELEVATION (FT FROM MSL 0)
KELLY BUSHING:
DERRICK FLOOR:
GROUND LEVEL:
502
55.02
28.58
#
WELL CASING RECORD
1ST STRING
2ND STRING
3RD STRING
PRODUCTION STRING
OPEN HOLE CASING DRILLERS
BIT SIZE (IN) SIZE (IN) DEPTH (FT)
4.125 7.000 9360.0
#
REMARKS:
1. ALL DEPTHS ARE MEASURED DEPTHS UNLESS OTHERWISE
NOTED.
2. ALL VERTICAL DEPTHS ARE TRUE VERTICAL DEPTHS - SUBSEA
(TVDSS) .
3. MWD RUN 1 WAS DIRECTIONAL WITH PRESSURE CASE GAMMA
(PCG)
UTILIZING SCINTILLATION DETECTORS. NO FOOTAGE WAS
DRILLED.
THE UPHOLE DATA (SGRD) ARE INCLUDED WITH RUN 2 DATA.
4. MWD RUN 2 WAS DIRECTIONAL WITH PCG.
5. MWD RUN 3 WAS DIRECTIONAL WITH PCG. DUE TO A TOOL
FAILURE, NO
DATA FROM THIS RUN IS PRESENTED.
6. MWD RUN 4 WAS DIRECTIONAL WITH GAMMA MODULE (GM)
UTILIZING
GEIGER-MUELLER TUBE DETECTORS. GAMMA RAY DATA (SGRC)
FOR THE
RUN 3 INTERVAL WERE ACQUIRED WHILE TRIPPING IN FOR
THIS RUN.
7. MWD RUN 5 WAS DIECTIONAL WITH GM, AND AND
ELECTROMAGNETIC WAVE
RESISTIVITY PHASE-4 (EWR4). PRIOR TO DRILLING, A MAD
PASS WAS
PERFORMED ACROSS THE INTERVAL (EWR4 SENSOR DEPTHS)
9360' - 9644 I .
THESE DATA (EWR4) ARE INCLUDED WITH THE RUN 4 DATA.
AFTER REACHING
TD AN ADDITIONAL MAD PASS WAS PERFORMED ACROSS THE
RUN 5 INTERVAL.
THESE DATA ARE INCLUDED AS A SEPARATE MAD PASS
PRESENTATION.
8. LOG AND DIGITAL (LDWG) DATA ONLY WERE DEPTH SHIFTED
TO A SCHLUMBERGER
MCNL GAMMA RAY RUN IN E-01A ON 12 APRIL 2003. THESE
PDC DATA WERE
RECEIVED VIA E-MAIL FROM D. SCHNORR (BP EXPLORATION)
ON 1 JULY 2003.
ALL HEADER DATA RETAIN ORIGINAL DRILLER'S DEPTH
)
REFERENCES.
)
9. MWD RUNS 1-5 REPRESENT WELL E-01A PB1 WITH API #
50-029-20166-70.
THIS WELL REACHED A TOTAL DEPTH (TD) OF 10678' MD /
9004' TVDSS.
SROP SMOOTHED RATE OF PENETRATION WHILE DRILLING
SGRD SMOOTHED GAMMA RAY - SCINTILLATION DETECTORS
SGRC SMOOTHED GAMMA RAY - GEIGER-MUELLER TUBE
DETECTORS
SEXP = SMOOTHED PHASE
SHALLOW SPACING)
SESP = SMOOTHED PHASE
SPACING)
SEMP = SMOOTHED PHASE
SPACING)
SEDP = SMOOTHED PHASE
SPACING)
SFXE = SMOOTHED FORMATION EXPOSURE TIME
SHIFT DERIVED RESISTIVITY ( EXTRA
SHIFT DERIVED RESISTIVITY ( SHALLOW
SHIFT DERIVED RESISTIVITY (MEDIUM
SHIFT DERIVED RESISTIVITY (DEEP
$
"M" SUFFIX ON CURVE MNEMONICS DENOTES MAD PASS DATA
File Header
Service name............ .STSLIB.001
Service Sub Level Name...
Version Number.......... .1.0.0
Date of Generation...... .03/07/08
Maximum Physical Record. .65535
File Type. . . . . . . . . . . . . . . . LO
Previous File Name...... .STSLIB.OOO
Comment Record
FILE HEADER
FILE NUMBER:
EDITED MERGED MWD
Depth shifted
DEPTH INCREMENT:
#
FILE SUMMARY
PBU TOOL CODE
GR
RPS
RPX
RPM
RPD
FET
ROP
$
1
and clipped curves¡ all bit runs merged.
.5000
START DEPTH
9164.0
9359.0
9359.0
9359.0
9359.0
9359.0
9388.5
STOP DEPTH
10641.5
10654.0
10654.0
10654.0
10654.0
10654.0
10686.0
#
BASELINE CURVE FOR SHIFTS:
CURVE SHIFT DATA (MEASURED DEPTH)
--------- EQUIVALENT UNSHIFTED DEPTH ---------
BASELINE DEPTH
9189.5
9197.0
9231.5
9240.0
9243.5
9247.5
GR
9187.5
9195.5
9229.5
9238.0
9241.0
9246.0
)
)
9251.5
9362.5
9365.5
9377.0
9379.0
9381.5
9393.0
10686.0
$
9248.5
9364.0
9367.0
9373.0
9375.0
9378.0
9385.0
10678.0
#
MERGED DATA SOURCE
PBU TOOL CODE
MWD
MWD
MWD
MWD
MWD
$
BIT RUN NO
1
2
3
4
5
MERGE TOP
9162.0
9248.5
9462.5
9500.0
9674.5
MERGE BASE
9248.5
9462.0
9500.0
9674.5
10678.0
#
REMARKS:
MERGED MAIN PASS.
$
#
Data Format Specification Record
Data Record Type..................O
Data Specification Block Type.....O
Logging Direction................ . Down
Optical log depth units.......... .Feet
Data Reference Point............. .Undefined
Frame Spacing.................... .60 .1IN
Max frames per record............ .Undefined
Absent value... . . . . . . . . . . . . . . . . . . . -999
Depth Units. . . . . . . . . . . . . . . . . . . . . . .
Datum Specification Block sub-type...O
Name Service Order Units Size Nsam Rep Code Offset Channel
DEPT FT 4 1 68 0 1
ROP MWD FT/H 4 1 68 4 2
GR MWD API 4 1 68 8 3
RPX MWD OHMM 4 1 68 12 4
RPS MWD OHMM 4 1 68 16 5
RPM MWD OHMM 4 1 68 20 6
RPD MWD OHMM 4 1 68 24 7
FET MWD HOUR 4 1 68 28 8
First
Last
Name Service Unit Min Max Mean Nsam Reading
Reading
DEPT FT 9164 10686 9925 3045 9164
10686
ROP MWD FT/H 0.38 488.92 97.784 2594 9388.5
10686
GR MWD API 15.65 892.36 40.3621 2760 9164
10641.5
RPX MWD OHMM 2.37 46.57 21.9324 2591 9359
10654
RPS MWD OHMM 3.23 58.53 26.4133 2591 9359
10654
RPM MWD OHMM 3.96 103.28 30.1541 2591 9359
)
10654
RPD MWD
10654
FET MWD
10654
OHMM
5.85
HOUR
0.15
)
209.9
41.6741 2591
33.55
5.60572 2591
First Reading For Entire File......... .9164
Last Reading For Entire File.......... .10686
File Trailer
Service name............ .STSLIB.OOl
service Sub Level Name...
Version Number..... ..... .1.0.0
Date of Generation...... .03/07/08
Maximum Physical Record. .65535
File Type................ LO
Next File Name.......... .STSLIB.002
Physical EOF
File Header
Service name............ .STSLIB.002
Service Sub Level Name...
Version Number.......... .1.0.0
Date of Generation...... .03/07/08
Maximum Physical Record. .65535
File Type............... .LO
Previous File Name...... .STSLIB.OOl
Comment Record
FILE HEADER
FILE NUMBER:
EDITED MERGED MAD
Depth shifted
passes.
DEPTH INCREMENT:
#
FILE SUMMARY
PBU TOOL CODE
RPX
RPS
RPS
RPD
FET
$
2
9359
9359
.5000
and clipped curves; all MAD runs merged using earliest
START DEPTH
9628.5
9628.5
9628.5
9628.5
9628.5
#
MERGED DATA SOURCE
PBU TOOL CODE
MWD
$
STOP DEPTH
10653.5
10653.5
10653.5
10653.5
10653.5
MAD RUN NO. MAD PASS NO. MERGE TOP
5 1 9620.5
#
REMARKS:
MERGED MAD PASS.
$
#
Data Format Specification Record
Data Record Type..................O
Data Specification Block Type.....O
MERGE BASE
10678.0
)
)
Logging Direction................ . Down
Optical log depth units.......... .Feet
Data Reference Point............. . Undefined
Frame Spacing.................... .60 .1IN
Max frames per record............ .Undefined
Absent value. . . . . . . . . . . . . . . . . . . . . . -999
Depth Uni t s . . . . . . . . . . . . . . . . . . . . . . .
Datum Specification Block sub-type...O
Name Service Order Units Size Nsam Rep Code Offset Channel
DEPT FT 4 1 68 0 1
RPX MAD OHMM 4 1 68 4 2
RPS MAD OHMM 4 1 68 8 3
RPM MAD OHMM 4 1 68 12 4
RPD MAD OHMM 4 1 68 16 5
FET MAD HOUR 4 1 68 20 6
First
Last
Name Service Unit Min Max Mean Nsam Reading
Reading
DEPT FT 9628.5 10653.5 10141 2051 9628.5
10653.5
RPX MAD OHMM 5.12 39.85 16.1492 2051 9628.5
10653.5
RPS MAD OHMM 6.32 42.47 21.856 2051 9628.5
10653.5
RPM MAD OHMM 7.03 53.52 26.3041 2051 9628.5
10653.5
RPD MAD OHMM 10.79 121.68 38.8163 2051 9628.5
10653.5
FET MAD HOUR 1.94 40.08 17.9793 2051 9628.5
10653.5
First Reading For Entire File......... .9628.5
Last Reading For Entire File.......... .10653.5
File Trailer
Service name........... ..STSLIB.002
Service Sub Level Name...
Version Number.......... .1.0.0
Date of Generation...... .03/07/08
Maximum Physical Record..65535
File Type................ LO
Next File Name.......... .STSLIB.003
Physical EOF
File Header
Service name............ .STSLIB.003
Service Sub Level Name...
Version Number.......... .1.0.0
Date of Generation...... .03/07/08
Maximum Physical Record..65535
File Type................ LO
)
Previous File Name...... .STSLIB.002
Comment Record
FILE HEADER
FILE NUMBER:
RAW MWD
Curves and log
BIT RUN NUMBER:
DEPTH INCREMENT:
#
FILE SUMMARY
VENDOR TOOL CODE
GR
$
3
)
header data for each bit run in separate files.
1
.5000
START DEPTH
9162.0
STOP DEPTH
9248.5
#
LOG HEADER DATA
DATE LOGGED:
SOFTWARE
SURFACE SOFTWARE VERSION:
DOWNHOLE SOFTWARE VERSION:
DATA TYPE (MEMORY OR REAL-TIME) :
TD DRILLER (FT):
TOP LOG INTERVAL (FT):
BOTTOM LOG INTERVAL (FT):
BIT ROTATING SPEED (RPM):
HOLE INCLINATION (DEG
MINIMUM ANGLE:
MAXIMUM ANGLE:
#
TOOL STRING (TOP TO BOTTOM)
VENDOR TOOL CODE TOOL TYPE
PCG Natural gamma ray
$
#
BOREHOLE AND CASING DATA
OPEN HOLE BIT SIZE (IN):
DRILLER'S CASING DEPTH (FT):
#
BOREHOLE CONDITIONS
MUD TYPE:
MUD DENSITY (LB/G):
MUD VISCOSITY (S):
MUD PH:
MUD CHLORIDES (PPM):
FLUID LOSS (C3):
RESISTIVITY (OHMM) AT TEMPERATURE (DEGF)
MUD AT MEASURED TEMPERATURE (MT):
MUD AT MAX CIRCULATING TERMPERATURE:
MUD FILTRATE AT MT:
MUD CAKE AT MT:
#
NEUTRON TOOL
MATRIX:
MATRIX DENSITY:
HOLE CORRECTION (IN):
#
TOOL STANDOFF (IN):
EWR FREQUENCY (HZ):
#
REMARKS:
$
31-MAR-03
Insite
7.75
Memory
9377.0
9377.0
9377.0
22.6
22.6
TOOL NUMBER
009
4.125
9360.0
Flo Pro
8.60
65.0
9.5
20000
6.5
.000
.000
.000
.000
.0
129.0
.0
.0
)
)
#
Data Format Specification Record
Data Record Type..................O
Data Specification Block Type.....O
Logging Direction................ . Down
Optical log depth units.......... .Feet
Data Reference Point............. . Undefined
Frame Spacing.................... .60 .1IN
Max frames per record............ .Undefined
Absent value..................... .-999
Depth Units. . . . . . . . . . . . . . . . . . . . . . .
Datum Specification Block sub-type...O
Name Service Order
DEPT
GR MWD010
Units Size Nsam Rep Code Offset Channel
FT 4 1 68 0 1
API 4 1 68 4 2
First
Last
Name Service Unit Min Max Mean Nsam Reading
Reading
DEPT FT 9162 9248.5 9205.25 174 9162
9248.5
GR MWD010 API 48.77 226.13 84.4346 174 9162
9248.5
First Reading For Entire File......... .9162
Last Reading For Entire File.......... .9248.5
File Trailer
Service name............ .STSLIB.003
Service Sub Level Name...
Version Number.......... .1.0.0
Date of Generation...... .03/07/08
Maximum Physical Record. .65535
File Type................ LO
Next File Name.......... .STSLIB.004
Physical EOF
File Header
Service name........... ..STSLIB.004
Service Sub Level Name...
Version Number. ......... .1.0.0
Date of Generation...... .03/07/08
Maximum Physical Record. .65535
F i 1 e Typ e. . . . . . . . . . . . . . . . LO
Previous File Name...... .STSLIB.003
Comment Record
FILE HEADER
FILE NUMBER:
RAW MWD
Curves and log
BIT RUN NUMBER:
4
header data for each bit run in separate files.
2
')
DEPTH INCREMENT:
#
FILE SUMMARY
VENDOR TOOL CODE
GR
ROP
$
.5000
START DEPTH
9351.0
9382.5
STOP DEPTH
9432.0
9462.0
#
LOG HEADER DATA
DATE LOGGED:
SOFTWARE
SURFACE SOFTWARE VERSION:
DOWNHOLE SOFTWARE VERSION:
DATA TYPE (MEMORY OR REAL-TIME) :
TD DRILLER (FT):
TOP LOG INTERVAL (FT):
BOTTOM LOG INTERVAL (FT):
BIT ROTATING SPEED (RPM):
HOLE INCLINATION (DEG
MINIMUM ANGLE:
MAXIMUM ANGLE:
#
TOOL STRING (TOP TO BOTTOM)
VENDOR TOOL CODE TOOL TYPE
PCG Natural gamma ray
$
#
BOREHOLE AND CASING DATA
OPEN HOLE BIT SIZE (IN):
DRILLER'S CASING DEPTH (FT):
#
BOREHOLE CONDITIONS
MUD TYPE:
MUD DENSITY (LB/G):
MUD VISCOSITY (S):
MUD PH:
MUD CHLORIDES (PPM):
FLUID LOSS (C3):
RESISTIVITY (OHMM) AT TEMPERATURE (DEGF)
MUD AT MEASURED TEMPERATURE (MT):
MUD AT MAX CIRCULATING TERMPERATURE:
MUD FILTRATE AT MT:
MUD CAKE AT MT:
#
NEUTRON TOOL
MATRIX:
MATRIX DENSITY:
HOLE CORRECTION (IN):
#
TOOL STANDOFF (IN):
EWR FREQUENCY (HZ):
#
REMARKS:
$
#
Data Format Specification Record
Data Record Type..................O
Data Specification Block Type.....O
Logging Direction. . . . . . . . . . . . . . . . . Down
Optical log depth units.......... .Feet
Data Reference Point............. .Undefined
)
02-APR-03
Insite
7.75
Memory
9462.0
9382.0
9462.0
22.6
27.1
TOOL NUMBER
009
4.125
9360.0
Flo Pro
8.70
65.0
9.5
20000
9.6
.000
.000
.000
.000
.0
129.0
.0
.0
)
)
Frame Spacing.................... .60 .1IN
Max frames per record............ .Undefined
Absent value. . . . . . . . . . . . . . . . . . . . . . -999
Depth Units. . . . . . . . . . . . . . . . . . . . . . .
Datum Specification Block sub-type...O
Name Service Order
DEPT
ROP MWD020
GR MWD020
Units Size Nsam Rep Code Offset Channel
FT 4 1 68 0 1
FT/H 4 1 68 4 2
API 4 1 68 8 3
First
Last
Name Service Unit Min Max Mean Nsam Reading
Reading
DEPT FT 9351 9462 9406.5 223 9351
9462
ROP MWD020 FT/H 1.89 111.92 52.2235 160 9382.5
9462
GR MWD020 API 17.08 892.36 43.1707 163 9351
9432
First Reading For Entire File......... .9351
Last Reading For Entire File.......... .9462
File Trailer
Service name........... ..STSLIB.004
Service Sub Level Name...
Version Number......... ..1.0.0
Date of Generation...... .03/07/08
Maximum Physical Record. .65535
File Type................ LO
Next File Name.......... .STSLIB.005
Physical EOF
File Header
Service name........... ..STSLIB.005
Service Sub Level Name...
Version Number.......... .1.0.0
Date of Generation..... ..03/07/08
Maximum Physical Record..65535
File Type................ LO
Previous File Name...... .STSLIB.004
Comment Record
FILE HEADER
FILE NUMBER:
RAW MWD
Curves and log
BIT RUN NUMBER:
DEPTH INCREMENT:
#
FILE SUMMARY
VENDOR TOOL CODE
5
header data for each bit run in separate files.
3
.5000
START DEPTH
STOP DEPTH
)
ROP
$
9462.5
9500.0
#
LOG HEADER DATA
DATE LOGGED:
SOFTWARE
SURFACE SOFTWARE VERSION:
DOWNHOLE SOFTWARE VERSION:
DATA TYPE (MEMORY OR REAL-TIME) :
TD DRILLER (FT):
TOP LOG INTERVAL (FT):
BOTTOM LOG INTERVAL (FT):
BIT ROTATING SPEED (RPM):
HOLE INCLINATION (DEG
MINIMUM ANGLE:
MAXIMUM ANGLE:
#
TOOL STRING (TOP TO BOTTOM)
VENDOR TOOL CODE TOOL TYPE
PCG Natural gamma ray
$
#
BOREHOLE AND CASING DATA
OPEN HOLE BIT SIZE (IN):
DRILLER'S CASING DEPTH (FT):
#
BOREHOLE CONDITIONS
MUD TYPE:
MUD DENSITY (LB/G):
MUD VISCOSITY (S):
MUD PH:
MUD CHLORIDES (PPM):
FLUID LOSS (C3):
RESISTIVITY (OHMM) AT TEMPERATURE (DEGF)
MUD AT MEASURED TEMPERATURE (MT):
MUD AT MAX CIRCULATING TERMPERATURE:
MUD FILTRATE AT MT:
MUD CAKE AT MT:
#
NEUTRON TOOL
MATRIX:
MATRIX DENSITY:
HOLE CORRECTION (IN):
#
TOOL STANDOFF (IN):
EWR FREQUENCY (HZ):
#
REMARKS:
$
#
Data Format Specification Record
Data Record Type..................O
Data Specification Block Type.....O
Logging Direction............... ..Down
Optical log depth units......... ..Feet
Data Reference Point............. . Undefined
Frame Spacing................... ..60 .1IN
Max frames per record............ . Undefined
Absent value.. . . . . . . . . . . . . . . . . . . . . -999
Depth Units. . . . . . . . . . . . . . . . . . . . . . .
Datum Specification Block sub-type...O
)
02-APR-03
Insite
7.75
Memory
9500.0
9462.0
9500.0
24.5
27.1
TOOL NUMBER
033
4.125
9360.0
Flo Pro
8.50
55.0
9.0
21000
9.6
.000
.000
.000
.000
.0
142.0
.0
.0
}
)
Name Service Order
DEPT
ROP MWD030
Units Size Nsam Rep Code Offset Channel
FT 4 1 68 0 1
FT/H 4 1 68 4 2
First
Last
Name Service Unit Min Max Mean Nsam Reading
Reading
DEPT FT 9462.5 9500 9481.25 76 9462.5
9500
ROP MWD030 FT/H 0.38 41.88 13.6605 76 9462.5
9500
First Reading For Entire File......... .9462.5
Last Reading For Entire File.......... .9500
File Trailer
Service name............ .STSLIB.005
Service Sub Level Name...
Version Number.......... .1.0.0
Date of Generation...... .03/07/08
Maximum Physical Record. .65535
F i 1 e Type....... . . . . . . . . . LO
Next File Name.......... .STSLIB.006
Physical EOF
File Header
Service name............ .STSLIB.006
Service Sub Level Name...
Version Number.......... .1.0.0
Date of Generation..... ..03/07/08
Maximum Physical Record. .65535
File Type................ LO
Previous File Name...... .STSLIB.005
Comment Record
FILE HEADER
FILE NUMBER:
RAW MWD
Curves and log
BIT RUN NUMBER:
DEPTH INCREMENT:
#
FILE SUMMARY
VENDOR TOOL CODE
RPD
RPM
RPS
RPX
FET
GR
ROP
$
6
header data for each bit run in separate files.
4
.5000
START DEPTH
9360.5
9360.5
9360.5
9360.5
9360.5
9432.5
9500.5
STOP DEPTH
9644.0
9644.0
9644.0
9644.0
9644.0
9647.0
9674.5
')
#
LOG HEADER DATA
DATE LOGGED:
SOFTWARE
SURFACE SOFTWARE VERSION:
DOWNHOLE SOFTWARE VERSION:
DATA TYPE (MEMORY OR REAL-TIME) :
TD DRILLER (FT):
TOP LOG INTERVAL (FT):
BOTTOM LOG INTERVAL (FT):
BIT ROTATING SPEED (RPM):
HOLE INCLINATION (DEG
MINIMUM ANGLE:
MAXIMUM ANGLE:
#
TOOL STRING (TOP TO BOTTOM)
VENDOR TOOL CODE TOOL TYPE
GM Dual GR
$
#
BOREHOLE AND CASING DATA
OPEN HOLE BIT SIZE (IN):
DRILLER'S CASING DEPTH (FT):
#
BOREHOLE CONDITIONS
MUD TYPE:
MUD DENSITY (LB/G):
MUD VISCOSITY (S):
MUD PH:
MUD CHLORIDES (PPM):
FLUID LOSS (C3):
RESISTIVITY (OHMM) AT TEMPERATURE (DEGF)
MUD AT MEASURED TEMPERATURE (MT):
MUD AT MAX CIRCULATING TERMPERATURE:
MUD FILTRATE AT MT:
MUD CAKE AT MT:
#
NEUTRON TOOL
MATRIX:
MATRIX DENSITY:
HOLE CORRECTION (IN):
#
TOOL STANDOFF (IN):
EWR FREQUENCY (HZ):
#
REMARKS:
$
#
Data Format Specification Record
Data Record Type.............. ....0
Data Specification Block Type.....O
Logging Direction................ . Down
Optical log depth units.......... .Feet
Data Reference Point............. . Undefined
Frame Spacing.................... .60 .1IN
Max frames per record............ .Undefined
Absent value. . . . . . . . . . . . . . . . . . . . . . -999
Depth Units. . . . . . . . . . . . . . . . . . . . . . .
Datum Specification Block sub-type...O
,)
03-APR-03
Insite
4.3
Memory
9680.0
9500.0
9680.0
44.8
66.4
TOOL NUMBER
82758
4.125
9360.0
Flo Pro
8.60
65.0
9.0
21000
9.6
.000
.000
.000
.000
.0
131.0
.0
.0
Name Service Order Units Size Nsam Rep Code Offset Channel
) )
DEPT FT 4 1 68 0 1
ROP MWD040 FT/H 4 1 68 4 2
GR MWD040 API 4 1 68 8 3
RPX MWD040 OHMM 4 1 68 12 4
RPS MWD040 OHMM 4 1 68 16 5
RPM MWD040 OHMM 4 1 68 20 6
RPD MWD040 OHMM 4 1 68 24 7
FET MWD040 HOUR 4 1 68 28 8
First
Last
Name Service Unit Min Max Mean Nsam Reading
Reading
DEPT FT 9360.5 9674.5 9517.5 629 9360.5
9674.5
ROP MWD040 FT/H 1.91 108.53 44.6851 349 9500.5
9674.5
GR MWD040 API 16.73 78.35 27.442 430 9432.5
9647
RPX MWD040 OHMM 2.37 34.09 12.8473 568 9360.5
9644
RPS MWD040 OHMM 3.23 58.53 19.6048 568 9360.5
9644
RPM MWD040 OHMM 3.96 65.99 24.9645 568 9360.5
9644
RPD MWD040 OHMM 5.85 188.14 39.6752 568 9360.5
9644
FET MWD040 HOUR 8.57 33.55 20.3466 568 9360.5
9644
First Reading For Entire File......... .9360.5
Last Reading For Entire File.......... .9674.5
File Trailer
Service name............ .STSLIB.006
Service Sub Level Name...
Version Number.......... .1.0.0
Date of Generation...... .03/07/08
Maximum Physical Record. .65535
File Type................ LO
Next File Name.......... .STSLIB.007
Physical EOF
File Header
Service name.... ........ .STSLIB.007
Service Sub Level Name...
Version Number.......... .1.0.0
Date of Generation...... .03/07/08
Maximum Physical Record. .65535
File Type............... .LO
Previous File Name...... .STSLIB.006
Comment Record
FILE HEADER
"
)
FILE NUMBER:
RAW MWD
Curves and log
BIT RUN NUMBER:
DEPTH INCREMENT:
#
FILE SUMMARY
VENDOR TOOL CODE
FET
RPD
RPM
RPS
RPX
GR
ROP
$
7
)
header data for each bit run in separate files.
5
.5000
START DEPTH
9644.5
9644.5
9644.5
9644.5
9644.5
9647.5
9675.0
STOP DEPTH
10646.0
10646.0
10646.0
10646.0
10646.0
10633.5
10678.0
#
LOG HEADER DATA
DATE LOGGED:
SOFTWARE
SURFACE SOFTWARE VERSION:
DOWNHOLE SOFTWARE VERSION:
DATA TYPE (MEMORY OR REAL-TIME) :
TD DRILLER (FT):
TOP LOG INTERVAL (FT):
BOTTOM LOG INTERVAL (FT):
BIT ROTATING SPEED (RPM):
HOLE INCLINATION (DEG
MINIMUM ANGLE:
MAXIMUM ANGLE:
#
TOOL STRING (TOP TO
VENDOR TOOL CODE
GM
EWR4
$
BOTTOM)
TOOL TYPE
Dual GR
ELECTROMAG. RESIS. 4
#
BOREHOLE AND CASING DATA
OPEN HOLE BIT SIZE (IN):
DRILLER'S CASING DEPTH (FT):
#
BOREHOLE CONDITIONS
MUD TYPE:
MUD DENSITY (LB/G):
MUD VISCOSITY (S):
MUD PH:
MUD CHLORIDES (PPM):
FLUID LOSS (C3):
RESISTIVITY (OHMM) AT TEMPERATURE (DEGF)
MUD AT MEASURED TEMPERATURE (MT):
MUD AT MAX CIRCULATING TERMPERATURE:
MUD FILTRATE AT MT:
MUD CAKE AT MT:
#
NEUTRON TOOL
MATRIX:
MATRIX DENSITY:
HOLE CORRECTION (IN):
#
TOOL STANDOFF (IN):
EWR FREQUENCY (HZ):
04-APR-03
Insite
4.3
Memory
10678.0
9680.0
10678.0
79.5
95.9
TOOL NUMBER
93091
126589
4.125
9360.0
Flo Pro
8.70
65.0
9.0
21000
8.6
.090
.000
.220
.230
68.0
148.0
68.0
68.0
\
,
')
#
REMARKS:
$
#
Data Format Specification Record
Data Record Type............... ...0
Data Specification Block Type.. ...0
Logging Direction.............. ...Down
Optical log depth units........ ...Feet
Data Reference Point........... ...Undefined
Frame Spacing.................... .60 .1IN
Max frames per record............ . Undefined
Absent value..................... .-999
Depth Units. . . . . . . . . . . . . . . . . . . . . . .
Datum Specification Block sub-type...O
Name Service Order Units Size Nsam Rep Code Offset Channel
DEPT FT 4 1 68 0 1
ROP MWD050 FT/H 4 1 68 4 2
GR MWD050 API 4 1 68 8 3
RPX MWD050 OHMM 4 1 68 12 4
RPS MWD050 OHMM 4 1 68 16 5
RPM MWD050 OHMM 4 1 68 20 6
RPD MWD050 OHMM 4 1 68 24 7
FET MWD050 HOUR 4 1 68 28 8
First
Last
Name Service Unit Min Max Mean Nsam Reading
Reading
DEPT FT 9644.5 10678 10161.3 2068 9644.5
10678
ROP MWD050 FT/H 0 488.92 113.856 2007 9675
10678
GR MWD050 API 15.65 160.55 39.0877 1973 9647.5
10633.5
RPX MWD050 OHMM 7.55 46.57 24.6695 2004 9644.5
10646
RPS MWD050 OHMM 9 52.89 28.5293 2004 9644.5
10646
RPM MWD050 OHMM 10.36 103.28 31.8281 2004 9644.5
10646
RPD MWD050 OHMM 13.39 209.9 42.4151 2004 9644.5
10646
FET MWD050 HOUR 0.15 12 1.16532 2004 9644.5
10646
First Reading For Entire File......... .9644.5
Last Reading For Entire File.......... .10678
File Trailer
Service name............ .STSLIB.007
Service Sub Level Name...
Version Number.......... .1.0.0
Date of Generation...... .03/07/08
Maximum Physical Record. .65535
File Type.... . . . . . . . . . . . . LO
)
)
Next File Name.......... .STSLIB.008
Physical EOF
File Header
Service name............ .STSLIB.008
Service Sub Level Name...
Version Number.......... .1.0.0
Date of Generation...... .03/07/08
Maximum Physical Record. .65535
File Type............... .LO
Previous File Name..... ..STSLIB.007
Comment Record
FILE HEADER
FILE NUMBER:
RAW MAD
Curves and log header data for each pass of each run in separate
files.
DEPTH INCREMENT:
MAD RUN NUMBER:
MAD PASS NUMBER:
#
FILE SUMMARY
VENDOR TOOL CODE
FET
RPX
RPS
RPM
RPD
$
#
LOG HEADER DATA
DATE LOGGED:
SOFTWARE
SURFACE SOFTWARE VERSION:
DOWNHOLE SOFTWARE VERSION:
DATA TYPE (MEMORY OR REAL-TIME) :
TD DRILLER (FT):
TOP LOG INTERVAL (FT):
BOTTOM LOG INTERVAL (FT):
BIT ROTATING SPEED (RPM):
HOLE INCLINATION (DEG
MINIMUM ANGLE:
MAXIMUM ANGLE:
#
TOOL STRING (TOP TO
VENDOR TOOL CODE
GM
EWR4
$
#
8
.5000
5
1
START DEPTH
9620.5
9620.5
9620.5
9620.5
9620.5
STOP DEPTH
10645.5
10645.5
10645.5
10645.5
10645.5
04-APR-03
Insite
4.3
Memory
10678.0
9675.0
10678.0
79.5
95.9
BOTTOM)
TOOL TYPE
Dual GR
ELECTROMAG. RESIS. 4
TOOL NUMBER
93091
126589
BOREHOLE AND CASING DATA
OPEN HOLE BIT SIZE (IN):
DRILLER'S CASING DEPTH (FT):
#
4.125
9360.0
BOREHOLE CONDITIONS
MUD TYPE:
MUD DENSITY (LB/G):
Flo Pro
8.70
)
)
MUD VISCOSITY (S):
MUD PH:
MUD CHLORIDES (PPM):
FLUID LOSS (C3):
RESISTIVITY (OHMM) AT TEMPERATURE (DEGF)
MUD AT MEASURED TEMPERATURE (MT):
MUD AT MAX CIRCULATING TERMPERATURE:
MUD FILTRATE AT MT:
MUD CAKE AT MT:
65.0
9.0
21000
8.6
.090
.000
.220
.230
68.0
148.0
68.0
68.0
#
NEUTRON TOOL
MATRIX:
MATRIX DENSITY:
HOLE CORRECTION (IN):
#
TOOL STANDOFF (IN):
EWR FREQUENCY (HZ):
#
REMARKS:
$
#
Data Format Specification Record
Data Record Type..................O
Data Specification Block Type.....O
Logging Direction................ . Down
Optical log depth units.......... .Feet
Data Reference Point............. .Undefined
Frame Spacing.................... .60 .1IN
Max frames per record............ . Undefined
Absent value.................. . . . . -999
Depth Units. . . . . . . . . . . . . . . . . . . . . . .
Datum Specification Block sub-type...O
Name Service Order Units Size Nsam Rep Code Offset Channel
DEPT FT 4 1 68 0 1
RPX MAD051 OHMM 4 1 68 4 2
RPS MAD051 OHMM 4 1 68 8 3
RPM MAD051 OHMM 4 1 68 12 4
RPD MAD051 OHMM 4 1 68 16 5
FET MAD051 HOUR 4 1 68 20 6
First
Last
Name Service Unit Min Max Mean Nsam Reading
Reading
DEPT FT 9620.5 10645.5 10133 2051 9620.5
10645.5
RPX MAD051 OHMM 5.12 39.85 16.1492 2051 9620.5
10645.5
RPS MAD051 OHMM 6.32 42.47 21.856 2051 9620.5
10645.5
RPM MAD051 OHMM 7.03 53.52 26.3041 2051 9620.5
10645.5
RPD MAD051 OHMM 10.79 121.68 38.8163 2051 9620.5
10645.5
FET MAD051 HOUR 1.94 40.08 17.9793 2051 9620.5
10645.5
"Ý
)
)
First Reading For Entire File......... .9620.5
Last Reading For Entire File.......... .10645.5
File Trailer
Service name............ .STSLIB.008
Service Sub Level Name...
Version Number.......... .1.0.0
Date of Generation...... .03/07/08
Maximum Physical Record. .65535
F i 1 e Typ e. . . . . . . . . . . . . . . . LO
Next File Name.......... .STSLIB.009
Physical EOF
Tape Trailer
Service name............ .LISTPE
Date.................... .03/07/08
Origin. . . . . . . . . . . . . . . . . . . STS
Tape Name............... .UNKNOWN
Continuation Number..... .01
Next Tape Name.......... . UNKNOWN
Comments................ .STS LIS Writing Library. Scientific
Technical Services
Reel Trailer
Service name............ .LISTPE
Date.................... .03/07/08
Origin. . . . . . . . . . . . . . . . . . . STS
Reel Name............... . UNKNOWN
Continuation Number..... .01
Next Reel Name.......... . UNKNOWN
Comments................ .STS LIS Writing Library. Scientific
Technical Services
Physical EOF
Physical EOF
End Of LIS File