Department of Commerce, Community, and Economic Development
Alaska Oil and Gas Conservation Commission
Loading...
HomeMy WebLinkAbout203-156New Plugback Esets
7/26/2024
Well Name API Number PTD
Number
ESet
Number
Date
CD2-09 PB1 50-103-20496-70-00 204-129 T39280 2-22-2006
CD2-10 PB1 50-103-20473-70-00 203-195 T39281 2-22-2006
CD2-28 PB1 50-103-20435-70-00 202-217 T39282 2-22-2006
CD2-40 PB1 50-103-20464-70-00 203-126 T39283 2-22-2006
CD2-43 PB1 50-103-20474-70-00 203-197 T39284 10-29-2004
Kasilof South 1 PB1 50-133-20520-70-00 202-256 T39285 5-16-2006
E-20AL1 PB1 50-029-22561-70-00 204-055 T39286 2-22-2006
F-57A PB1 50-029-22747-70-00 203-167 T39287 2-22-2006
G-18 PB1 50-029-23194-70-00 204-020 T39288 2-22-2006
H-16 PB2 50-029-23227-71-00 204-190 T39289 1-27-2005
I-17L1 PB1 50-029-23212-70-00 204-099 T39290 2-22-2006
S-01 PB1 50-029-23141-70-00 203-034 T39291 2-22-2006
S-08 PB1 50-029-23168-70-00 203-123 T39292 8-29-2003
S-18 PB1 50-029-23133-70-00 202-242 T39293 2-22-2006
06-23B PB1 50-029-20808-70-00 204-087 T39294 2-22-2006
07-14B PB1 50-029-20339-70-00 203-142 T39295 2-22-2006
15-38A PB1 50-029-22496-70-00 203-016 T39296 2-22-2006
C-16A PB1 50-029-20438-70-00 203-084 T39297 2-22-2006
D-28B PB1 50-029-21556-70-00 209-089 T39298 8-20-2012
E-01A PB1 50-029-20166-70-00 203-033 T39299 2-22-2006
K-03B PB1 50-029-21011-72-00 204-115 T39300 2-22-2006
NK-62A PB1 50-029-22852-70-00 203-047 T39301 2-22-2006
S-102L1 PB1 50-029-22972-70-00 203-156 T39302 10-26-2005
W-09A PB1 50-029-21947-70-00 204-102 T39303 2-22-2006
S-102L1 PB1 50-029-22972-70-00 203-156 T39302 10-26-2005
Image prbject Well History File coJer Page
XHVZE
This page identifies those items that were not scanned during the initial production scanning phase.
They are available in the original file, may be scanned during a special rescan activity or are viewable
by direct inspection of the file.
Q 03 - j 5 fo Well History File Identifier
Organizing (done)
D Two-sided 111111111 1111111111
D Rescan Needed III 111111 1111111111
RESCAN
DIGITAL DATA
OVERSIZED (Scannable)
D Maps:
D Other Items Scannable by
a Large Scanner
o Color Items:
o Greyscale Items:
D Diskettes, No.
D Other, No/Type:
o Poor Quality Originals:
OVERSIZED (Non-Scannable)
o Other:
D Logs of various kinds:
NOTES:
D Other::
BY: C Maria ")
Date: 1!)- J IS ¡OS
/5/
Scanning Preparation
BY: C Maria. )
'----.
1111111111111111111
Date: J a-J ' 5 / o-S;- Isl
~ X 30 = (1 () + ~ = TOTAL PAGES C1'"?J
J -~/. (Count does not include cover sleet)
Date: I d 15j t),ç /5/
1111111111111111111
Project Proofing
BY: CMaria J
Production Scanning
Stage 1
Page Count from Scanned File: 0: Lf- (Count does include co~ sheet)
Page Count Matches Number in sea. ~nit"\g :eraration: V YES
~ Date: iJ../IS /05
If NO in stage 1, page(s) discrepancies were found: YES
NO
BY:
/5/
Stage 1
BY:
NO
Maria
Date:
/5/
111I11 ·1111
Scanning is complete at this point unless rescanning is required.
ReScanned
1111111111111111111
BY:
Maria
Date:
/5/
Comments about this file:
Quality Checked
1111111111111111111
10/6/2005 Well History File Cover Page.doc
iLUtIVtu
•
STATE OF ALASKA • NOV 2 0 2012
ALASKA OIL AND GAS CONSERVATION COMMISSION
WELL COMPLETION OR RECOMPLETION REPORT AND LO G 0GCn
1 a. Well Status: ❑ Oil ❑ Gas ❑ SPLUG ❑ Other ® Abandoned ❑ Suspended lb. Well Class
• 20AAC 25.105 20AAC 25.110 ❑ Exploratory ❑ Stratigraphic
❑ GINJ ❑ WINJ ❑ WAG ❑ WDSPL ❑ Other No. of Completions Zero . ® Development ❑ Service
2. Operator Name: 5. Date Comp., Susp., or Aband.: 12. Permit to Drill Number:
BP Exploration (Alaska) Inc. 8/16/2012 " 203 -156 .
3. Address: 6. Date Spudded: 13. API Number:
P.O. Box 196612, Anchorage, Alaska 99519 - 6612 10/26/2003 50- 029 - 22972- 60 -00'
4a. Location of Well (Governmental Section): 7. Date T.D. Reached: 14. Well Name and Number:
Surface: 11/2/2003 . PBU S - 102L1
4452' FSL, 4499' FEL, Sec. 35, T12N, R12E, UM 8. KB (ft above MSL): 64.2' 15. Field / Pool(s)
Top of Productive Horizon:
655' FSL, 4443' FEL, Sec. 22, T12N, R12E, UM GL (ft above MSL): Prudhoe Bay Field / Aurora Pool •
Total Depth: 9. Plug Back Depth (MD +TVD)
3386' FSL, 4943' FEL, Sec. 22, T11 N, R12E, UM 12675' 6751'
4b. Location of Well (State Base Plane Coordinates, NAD: 10. Total Depth (MD +TVD) 16. Property Designation: A +) r z• + 3
Surface: x - 618930 • y - 5980655 • Zone ASP4 '14980' 6852' • ADL 028256.&28257
TPI: x- 613590 y- 5987336 Zone- ASP4 11. SSSV Depth (MD +TVD) 17. Land Use Permit:
Total Depth: x- 613043 Y - 5990059 Zone- ASP4 None
18. Directional Survey: 0 Yes 1E1 No 19. Water depth, if offshore: 20. Thickness of Permafrost (TVD):
(Submit electronic and printed information per 20 AAC 25.050) N/A ft MSL 1900' (Approx.)
21. Logs Obtained (List all logs here and submit electronic and printed information per 20 AAC 25.071): 22. Re -Drill /Lateral Top Window MD/TVD:
SGRC, GR, EWR, Memory Quad Combo, GR / CCL 12827' 6748'
23. CASING, LINER AND CEMENTING RECORD
SETTING DEPTH MD SETTING DEPTH TVD HOLE AMOUNT
CASING WT. PER FT. GRADE TOP BOTTOM TOP BOTTOM SIZE CEMENTING RECORD PULLED
20" 91.5# H -40 29' 109' 29' 109' 30" 260 sx Arctic Set (Approx.)
10 -3/4" 45.5# K - 55 27' 4816' 27' 3314' 13-1/2" 543 sx AS Lite 3, 510 sx Class 'G', Top Job: 150 sx AS Lite
7" 29# L -80 26' 11719' 26' 6763' 9 -7/8" 627 sx Class 'G'
4 -1/2" 12.6# L -80 11543' 12827' 6708' 6748' 6 -1/8" 57 sx Class 'G'
3- 3/16" x 6.2# / 6.16# L -80 12737' 14968' 6750' 6852' 3 -3/4" Uncemented Slotted Liner
2 -7/8"
24. Open to production or injection? ❑ Yes ® No 25. TUBING RECORD
If Yes, list each interval open MD PACKER SET
(MD +TVD of Top & Bottom; Perforation Size and Number): SIZE D EPTH SET (MD) ( MD / TVD) -
4 -1/2 ", 126#, 13Cr85 x 3 -1/2 ", 9.3#, 13Cr80 12720' 11316' / 6611'
4-1/2", 12.6 #, L -80 11520' - 11559' 11524' / 6701'
26. ACID, FRACTURE, CEMENT SQUEEZE, ETC.
semiNED 2 8 2013 WAS HYDRAULIC FRACTURING USED DURING COMPLETION? ❑ Yes ® No
FEB L DEPTH INTERVAL (MD) AMOUNT AND KIND OF MATERIAL USED
12675' 3 -1/2" Baker CIBP - New PBTD
12308' - 12318', 12550' - 12575' Tubing Punch for squeeze perfs
11660' - 12737' 123.5 Bbls LARC Cement - Effectively shut off
Lateral production
27. PRODUCTION TEST
Date First Production Method of Operation (Flowing, Gas Lift, etc
Not on Production N/A
Date of Test Hours Tested Production For OIL -BBL: GAS -MCF: WATER -BBL: CHOKE SIZE: GAS-OIL RATIO:
Test Period
Flow Tubing Casing Press: Calculated OIL -BBL: GAS -MCF: WATER-BBL: OIL GRAVITY -API (CORR):
Press. 24 -Hour Rate
28. CORE DATA Conventional Core(s) Acquired? ❑ Yes ® No Sidewall Core(s) Acquired? ❑ Yes ® No
If Yes to either question, list formations and intervals cored (MD +TVD of top and bottom of each), and summarize lithology and presence of oil, gas or water
(submit separate sheets with this form, if needed). Submit detailed descriptions, core chips, photographs and laboratory analytical results per 20 AAC 250.071.
None HOV 21 20i2 '
Form 10 -407 Revised 10/2012 CONTINUED ON REVERSE Submit Original Only
,/f`" / /} --,_., r2- r3 G
29. GEOLOGIC MARKERS (List all formations markers encounter 30. FORMATION TESTS
NAME MD TVD Well Tested? Yes ® No
Permafrost Top If yes, list intervals and formations tested, briefly summarizing test
Permafrost Base results. Attach separate sheets to this form, if needed, and submit
detailed test information per 20 AAC 25.071.
This lateral was drilled entirely None
within the Kuparuk C interval.
Kuparuk C2E 11654' 6744'
Formation at Total Depth:
31. List of Attachment: Summary of Daily Work History, Well Schematic Diagram
32. I hereby certify that the foregoing is true and correct to the best of my knowledge.
Contact: Allely, 56 • - lejn @bp.com Email: lastufjn @bp.com
Printed Name: Joe astufk Title: Drilling Technologist
564 -4091
Signatur • Phone Date: Il /�
INSTRUCTIONS
General: This form is designed for submitting a complete and correct well completion report and log on all types of lands and leases in Alaska. Submit a
well schematic diagram with each 10-407 well completion report and 10 -404 well sundry report when the downhole well design is changed.
Item 1 a: Classification of Service Wells: Gas Injection, Water Injection, Water - Alternating -Gas Injection, Salt Water Disposal, Water Supply for Injection,
Observation, or Other. Multiple completion is defined as a well producing from more than one pool with production from each pool completely
segregated. Each segregated pool is a completion.
Item 4b: TPI (Top of Producing Interval).
Item 8: The Kelly Bushing and Ground Level elevation in feet above mean sea level. Use same as reference for depth measurements given in other
spaces on this form and in any attachments.
Item 13: The API number reported to AOGCC must be 14 digits (ex: 50 - 029 - 20123 00 - 00).
Item 20: Report true vertical thickness of permafrost in Box 20. Provide MD and TVD for the top and base of permafrost in Box 28.
Item 23: Attached supplemental records for this well should show the details of any multiple stage cementing and the location of the cementing tool.
Item 24: If this well is completed for separate production from more than one interval (multiple completion), so state in item 1, and in item 23 show the
producing intervals for only the interval reported in item 26. (Submit a separate form for each additional interval to be separately produced,
showing the data pertinent to such interval).
Item 27: Method of Operation: Flowing, Gas Lift, Rod Pump, Hydraulic Pump, Submersible, Water Injection, Gas Injection, Shut -In, or Other (explain).
Item 28: Provide a listing of intervals cored and the corresponding formations, and a brief description in this box. Submit detailed description and analytical
laboratory information required by 20 AAC 25.071.
Item 30: Provide a listing of intervals tested and the corresponding formation, and a brief summary in this box. Submit detailed test and analytical laboratory
information required by 20 AAC 25.071.
Form 10 -407 Revised 10/2012 Submit Original Only
• •
S- 102L1, Well History
Date Summary
06/21/12 T /I /O= 1820/1823/40 Temp =S /I Assist slickline w/ Load & MIT -IA PASSED to 2500 psi. Pumped 5 bbls of
neat meth and 190 bbls of 90* F crude to load IA. SSL set DV in station #3. Pumped 1.8 bbls of crude to
reach test pressure. IA lost 79 psi. in the 1st 15 min. and 17 psi. in the 2nd 15 min. for a total loss of 96
psi.in a 30 min. test. Bled back— 3 bbls to Final WHP= 2086/200/48. SSL on well at departure.
07/24/12 CTU #9 1.75" Coil Tubing - Job Scope = Drift/Log, CIBP, Drift/Log, CIBP, Perf, Cement
MIRU, RIH w/ BOT MHA, PDS memory gamma ray /ccl tools inside 2.2" carrier w/ a 2.7" drift nozzle on
the bottom. Tagged the liner top at 12731' ctm. Attempted multiple ways to get through with no luck.
Pumped down the coil, no luck. Started to load well and had freezing issues. Pumped down the coil up
the backside to warm and load the well. turned around once the well was loaded and pumped down the
backside a hole volume and attempted to get into the liner top. No luck. Stopped at 12713' ctm and
logged up at 40 fpm. stopped at 12541' ctm to paint a flag on the coil. logged up at 40 fpm. stopped at
12200' ctm and flagged pipe. logged up to 11000' ctm. POOH. Downloaded tool at surface. Good GR but
no CCL.
07/25/12 CTU #9 1,75" CT. RIH w/ 2.35" JSN and Memory GR /CCL. Tag liner top at 12,731'CTM. Unable to enter
3- 3/16" liner. Log memory GR /CCL up from 12,731' to 11,000'CTM at 40 fpm. Paint flags. POOH. Good
log data. Tie GR /CCL into MWD ref log. Attempt to RIH w/ CIBP. POOH w/ CIBP after observing weight
bobbles. Hookup to read downhole BHP /BHT. RIH w/ 2.78" CIBP drfit. Position nozzle at 11,000'CTM and
perform step rate injectivity test w/ 1% KCI at 1, 3, & 5 bpm in 5 min intervals (see detail in Log). Tag at
12,727'CTM. Repaint flags. POOH. Pull up into lubricator and perform step rate injectivity test w/ 1% KCI
at 1, 3, & 5 bpm in 5 min intervals.
07/26/12 CTU #9 1,75" CT. Job Scope: Frac Prep / RIH w / 3.5" baker CEP Set 3.5" CIBP at 12675' Pressure
tested plug to 3032 psi for 10 mins and lost 13 psi. Found bad spots in pipe below min starting at 9700'
to 9000' from .074 to .063 for min.
08/01/12 CTU #9 w / 1.75" ct : Job objective Perforate ./ cement squeeze. Completed weekly BOP test. Tied in
from CIBP and shot 2.0" 6spf guns from 12308'- 12318' corr.CTMD. Performed inj. test and squeezed
LARC cement. lnj rates: static BHP= 3343psi, @lbpm BHP= 3393psi, @2bpm BHP= 3475psi. Park coil at
12250' and line up and squeeze 55 bbls cement behind liner. Observe — 300psi increase in WHP while
pumping. Well drinking while laying in cement (see log for details). 4 bbls of cement laid in. Allow cement
to thicken and attempt bump up BHP 200psi. Pressure bleeds down <5 min.
08/02/12 CTU #3 w/1.75" ct. Allow cement to thicken but could only build 30 psi squeeze pressure. Clean out from
10600 - 12666' cmtd and POOH at 80% while washing jewelry and maintaining constant BHP from
downhole gage. Freeze protect from 2500'. Wait on cement to gain 500psi compressive strength. MIT -T
to 1000 psi, lost 417psi in 15 min (see log for details). Begin MU Drift/GR -CCL BHA.
08/03/12 CTU #3 w/ 1.75" ct. MU Drift/GR -CCL BHA w/2.80" JSN. Tag at 12200' cmtd. Attempt to work past.
POOH to pick up motor and mill. RIH w / motor & parabolic 2.81" mill. Tagged cement @ 12200' Milled to
12315' no more motor work PUH chasing sweep RBIH shut down pump at 12280' drift to CIBP @ 12675'.
POOH. Injectivity test: 0.5bpm @ 1250psi and 0.65bpm @ 1480psi.
08/04/12 MU Perforating BHA: 25'x2.50" 2506 PJ Omega, 6spf, 60 deg phasing, 12gm. Tog shot 12550' Bottom
shot 12575' POOH At surface confirmed guns fired.RIH w / slb logging tools.Run base line temp pass.
Perform stop counts 12200' / 12500' & flag at 12665'. Pump 260 bbls of 80* KCI. Injectivity Test: lbpm @
2057psi, 3bpm @ 2350 3.5bpm @ 2400psi. Log temp passes: baseline, 1 & 3 hr warmbacks up /down at
60fpm. Begin logging 5 hr warmback pass.
Page 1 of 2
• •
S- 102L1, Well History
Date Summary
08/15/12 CTU #9 1.75" Coil Tubing. Job Scope: Cement Squeeze (Frac Prep). MIRU, Perform weekly BOP test.
RIH w/ 2.1" BDN. SBHP = 3342. RIH to 11,000'CTM. Perform injectivity test: 0.5 bpm stabilized at WHP
1500 psi, BHP 4333 psi, BHT 130 *F. 1 bpm stabilized at WHP 1950 psi, BHP 4780 psi, BHT 124 *F. Tag
CIBP at 12,650'CTM. Correct to ELMD. PU 50' and flag coil (red /white). Verify field cement lab test.
Continue fluid pack.
08/16/12 CTU #9 1.75" Coil Tubing. Job Scope: Cement Squeeze (Frac Prep). Continue batch mixing cement.
Batch mixed cement field test complete, verify within specs. Position nozzle at 12 625' ELM. Come online
down CT bullheading 5 bbls FW followed by 15.8 ppg LARC cement into formation. Lay in 3.2 bbls of
cement into tubing to 12,250' ELM. Down squeeze bbls 11.1 bbls of cement into formation before
exceeding 2500 psi at 0.5 bpm. Lay in coil volume of cement (39.2 bbls) into tubing while maintaining
>500 psi overbalance. PUH to safety at 8,300'ELM. Perform hesitation squeeze in 500 psi increments up
to 5900 psi squeezing 3 additional bbls behind pipe. 14 total bbls of cement behind pine. See Log for
detail BHP data. Swapped to biozan and dropped ball, conaminated down to a tag @ 12672' reciped up,
down, and chased out of hole. Stand by for cement to get compressive strength.
Page 2 of 2
TREE = 4- 1/16" CM/ •
WELLHEAD = FMC SAFETY NO: WELL ANGLE > 70° @ 12972 "" CHROME
ACTUATOR = LC-0 TBG "' CAUTION: 2 SWS RADIOACTIVE SOURCES P&A'd
KB ELEV = 64 2' S -102 10/04100 w/ RED CMT TO PB 8017' MD /4655' TVD. 1) 8564'
r MD/4882' TVD -2.0 CURIE CS-137. 2) 8531' MD/4867' TVD -
BF. ELEV = I 4.0 CURIE AM - 241 ~ DO NOT RE -ENTER WELL BELOW PB
t KOP = 1400' DEPTH BEFORE CALLING U.S. NUCLEAR REG COMMISSION
i Max Angle = 93' @ 12497' 20" CONDUCTOR, 109' V. AK DEPT OF O&G *"
Datum MD = 11724' 91.5#, H-40,
Datum TV D = 6700' SS ID = 19.124" I 2206' 1-14-117' HES X NP, D = 3.813"
110 -3/4" TAM FORT COLLAR —I 982'
7" FORT COLLAR J GAS LIFT MANDRELS
I 2185' ST MD I V t:' ! DEV TY PE VLV LATCH PORT DATE 1
10 -3/4" CSG, 45.5#, K 55 -BTC, D= 9.95" 4816' 4 5830 3740 67 KBG -4 -5 DOME BK 16 11/07/12
3 9052 5247 53 KBG -4 -5 SO BK 20 11/07/12
7" PORT COLLAR —1 6992' 2 10429 6084 54 KBG -4 -5 DMY BK 0 10/27/11
1 11136 6505 ` 53 KBG-4 -5 DMY BK 0 10/27/11
4 -1/2" MDPG -C GAUGE MANDREL, ID = 3.958" 1 11212'
1 111 11287' H4 -1/2" HES X NIP, V= 3.813"
Minimum ID = 2.972" @ 11446' 1
4 -112" X 3-1/2" X0 I 11316' —17" X4-1/2" HES TM PKR D = 3.856"
11351' —14-1/2" HES X NP, D= 3.813" I
i
1I 4 -1/2" TBG, 12.6#, 13CR-85 VAM TOP, 11447 11421' — 14 - 112" HES XN NP, D= 3.725"
11 .0152 bpf, ID = 3.958"
11446' I-141/2" X 3-1/2" XO, ID= 2972" 1
4 112" TBG STUB (09120111) —1 11520' 11524' — 17" X 4 -112" BKR S-3 PKR ID= 3.875"
11543' 1-17.40' TIEBACK SLV, ID = 5.25" 1
TOP OF 4-112" LNR 11543' 11547' I I 4- 112" HES X MP, D = 3.813"
1 1 P 11550' —17' X 5" BKR LTP, ID= 4.406"
4 -1/2" TBG, 12.6#, L -80 13T, 11559' '� �� 11557' —17" X 4-1/r BKR MAC HGR ID= 3.938" 1
.0152 bpf, D= 3.958" 11559' I - - 1/2" WLEG, D =4.00"
11553' -i am TT LOGGED 12/12/00 1
7" CSG, 29 #, L -80 BTC-M, H 11717'
.0371 bpf, ID = 6.182" r ■ — 11660 I EST TOC
PERFORATION SUMMARY O. •
REF LOG: PDS JEWELRY LOG ON 12/11/00 12264' —I NES TY FE H CEMENTER, MLL ®TO 3.80" (10/8/03) •
V AI
ANGLE AT T O P POW: 74° @ 11720' - • 1 . _ I 12267' h4- 1 /21BKR C EXTERNAL PKR D = 3.875"
Note: Refer to Production DBfor historical perf data
SVE SPF I ICERVAL 1 Opn /Sqz 1 DATE
SEE PAGE 2 FOR PERFORATION DATA 0.,
1 1 1 1 1 i•
I FSTD 12675'
3 -1/2" TBG, 9.3#, 13CR -80 STL 12690'
.0087 bpf, D= 2.972" .- 12676' - -13 -1/2" BKR CEP (07/25/12)
4 -1/2' LNR, 12.6#, L-80 °r T —1 — 12737' ...... 1 12720' — 13 - 1/2" HALF NIIA FSHDE D = 3.00'
}
.0152 bpf, ID= 3.958' 1 111 , 5 L ' edit
DATE REV BY COM1tENTS DATE REV BY oiiMvENTS AURORA UNIT
10/24/00 COMPLETION 08/09/12 LLV PJC CMT SQZ/ PERF (08/07/12) WELL: S -102
11/05/03 TM NI TLP CTD SIDETRACK (L1) 08/23/12 JJUJMD CMT SOZ/ FERF (08/16 - 17/12) PERMT No: '001290
10/31/11 D-16 RWO 10/24/12 TTR/JM? ADPERF(10 /06/12) AF1No: 50- 029 - 22972 -00
( 11/13/11 PJC DRLG DRAFT CORRECTIONS 11/09/12 PJC GLV C/O (11/07/12) SEC 35, T12N, R12E 828' FNL & 781' FWL
01/12/12 DB/PJC .FINAL DRLG CORRECTIONS 11/19/12 JA /JMD CMT /FERF SOZ
08/08 /12 JJU PJC SET FLOG (07/26/12) BP Exploration (Alaska)
1 ` •
S -102
=�=
1 1
z
1 1
1 1
z
PERFORATION SUt RY
REF LOG: PDS JEWELRY LOG ON 12/11/00
ANGLE AT TOP PERF: 74° @ 11720' , '
Note: Refer to Production DB for historical perf data
SIZE SPF INTERVAL Opn /Sqz SHOT SQZ
S -102 ■ 1
2 -7/8" 6 11660 - 11680 S 08/11/11 08/16/12
3 -3/8" 6 11680 - 11700 S 01/21/01 08/16/12
2 -718" 6 11690 - 11710 S 12122/06 08/16/12
3-3/8" 6 11716 - 11736 S 01/21/01 08/16/12
2 -1/2" 6 11720 - 11745 0 10/06/12 •
2" 6 12308 - 12318 S 08/01/12 08/02/12
2 -1/2" 6 12524 - 12549 0 08/17/12 _
2" 6 12550 - 12575 S 08/04/12 08/16/12
S -102L1 4
2 -718" SLID 13284 - 14384 AB 11/02/03 4
2 -78" SLTD 14475 - 14935 AB 11/02/03 r
41
OH 14
■
Ra
DATE REV BY COMMENTS DATE REV BY CO E TS AURORA UNIT
10124/00 COMPLETION 08/09/12 LLV PJC CMT SQZ/ PERF (08/07/12) WELL: S -102
11/05103 TM NITLP CTD SIDETRACK (L1) 08/23/12 JJL/JM3 CMT SQZ/ FEW (08/16 - 17/12) FERMI '001290
10131111 0-16 RWO 10/24/12 TTR/JM) ADPERF (10/06/12) AR No: 50- 029 - 22972 -00
11/13/11 PJC DI:LG DRAFT CORRECTIONS 11/09/12 PJC GLV C/O (11/07/12) SEC 35, T12N, R12E 828' FNL & 781' FWL
01/12/12 DB/PJC FINAL DRLG CORRECTIONS ' 11/19/12 JA/J1113 CMT /PEKE SOZ
08/08/12 JJL/ PJC SET RUG (07/26/12) BP Exploration (Alaska)
ilITATE OF ALASKA •
ALASKA OIL AN AS CONSERVATION COMMISSION
REPORT OF SUNDRY WELL OPERATIONS
1. Operations Performed:
❑ Abandon ® Repair Well ❑ Plug Perforations ❑ Stimulate ❑ Re -Enter Suspended Well
❑ Alter Casing w Pull Tubing ❑ Perforate New Pool ❑ Waiver ❑ Other
❑ Change Approved Program ❑ Operation Shutdown ❑ Perforate ❑ Time Extension
2. Operator Name: 4. Well Class Before Work: 5. Permit To Drill Number:
BP Exploration (Alaska) Inc. ® Development ❑ Exploratory `. 203 456
3. Address: ❑ Service ❑ Stratigraphic 6. API Number:
P.O. Box 196612, Anchorage, Alaska 99519 - 6612 '. 50 029 - 22972 - 60 - 00
7. Property Designation: C.W.--, 1? 1.A. 8. Well Name and Number:
ADL 028257& 0 a • PBU S - 102L1
9. Field / Pool(s):
Prudhoe Bay Field / Aurora Pool
10. Present well condition summary
Total depth: measured 14980' feet Plugs (measured) 14430' feet
true vertical 6852' feet Junk (measured) See Diagram feet
Effective depth: measured 14968' feet Packer: (measured) 11316' & 11524' feet
true vertical 6842' feet Packer: (true vertical) 6611' & 6701' feet
Casing Length Size MD TVD Burst Collapse
Structural
Conductor 80' 20" 109' 109' 1490 470
Surface 4789' 10 -3/4" 4816' 3314' 3580 2090
Intermediate 11693' 7" 11719' 6763' 8160 7020
Production
Liner 1557' 4 -1/2" 11543' - 12827' 6708' - 6748' 8430 7500
Liner 3 - 1/2" x 3 - 3/16" x 2 - 7/8" 12737' - 14968' 6750' - 6852'
Perforation Depth: Measured Depth: Slotted Section: 13284' - 14935' n True Vertical Depth: 6809' - 6853' 0 ,' l; , ' '
Tubing (size, grade, measured and true vertical depth): 4 -1/2 ", 12.6# x 3 -1/2 ", 9.3# 13Cr85 / 13Cr80 12720' 6750'
& 4-1/2", 12.6# & L -80 11520' - 11559' 6700' - 6714'
Packers and SSSV (type, measured and true vertical depth): 7" x 4 - 1/2" HES 'TNT' packer 11316' 6611'
7" x 4 - 1/2" Baker 'S - 3' packer 11524' 6701'
q
11. Stimulation or cement squeeze summa ry: R `' RIELJa
Intervals treated (measured): r N"( . • ,ti
OP
Treatment description including volumes used and final pressure:
a Oil & Gas Cons. Commission
ncnor 4ge
12. Representative Daily Average Production or Injection Data
Oil -Bbl Gas -Mcf Water -Bbl Casing Pressure Tubing Pressure
Prior to well operation:
Subsequent to operation:
13. Attachments: ❑Copies of Logs and Surveys run 14. Well Class after work:
❑ Exploratory • ® Development ❑ Service ❑ Stratigraphic
® Daily Report of Well Operations
IN Well Schematic Diagram 15. Well Status after work: ❑ GINJ • ® Oil ❑ SUSP ❑ WDSPL
❑ Gas ❑ GSTOR ❑ SPLUG ❑ WAG ❑ WINJ
16. I hereby certify that the foregoing is true and correct to the best of my knowledge. Sundry Number or N/A if C.O. Exempt:
Contact David Bjork, 564 -5683 N/A
Printed Name Terrie Hubble Title Drilling Technologist
( 7..! i Z Prepared By Name/Number:
Signature �j,/1/1f Q ik � 4 Phone 564 - 4628 Date 1/1 Terrie Hubble, 564 -4628
Form 10-404 Revised 10/2010 w = D S DEC 0 2 20111 / L , j..• / % , Submit Original Only
Z/2 r;
• •
North Am -,AE. SKA. - ip : P age 1
of 15"
O
` mma a rt-
2: t� i�a %on =Su ::: Rf .
Common Well Name: S -102 AFE No
Event Type: WORKOVER (WO) Start Date: 10/10/2011 End Date: X4- 00V44 -E (4,700,000.00 )
Project: Prudhoe Bay Site: PB S Pad
Rig Name /No.: DOYON 16 Spud Date/Time: 9/14/2000 12:00:OOAM Rig Release:
Rig Contractor: DOYON DRILLING INC. UWI: 500292297200
Active Datum: S -102 @64.20ft (above Mean Sea Level)
Date From - To Hrs Task Code NPT NPT Depth Phase Description of Operations
(hr) (ft)
10/16/2011 18:00 - 00:00 6.00 RIGD P PRE RIG DOWN LOCATION AND PREP TO
DERRICK DOWN AND PULL OFF WELL
S -102 LOCATION IS NOT READY FOR RIG
HIGH WINDS SO WE ARE WAITING TO
DERRICK DOWN AS THERE IS NO NEED AT
THIS TIME
10/17/2011 00:00 - 04:00 4.00 MOB P PRE WAIT ON PAD PREP OF S -102,
CONTINUE TO R/D AND PREP TO MOVE
04:00 - 04:30 0.50 MOB P PRE HIGH WINDS HAVE DIED DOWN
LAY DERRICK OVER AND SECURE ON
DERRICK STAND
04:30 - 08:30 4.00 MOB P PRE CONTINUE R/D LOCATION AND PREP TO
MOVE OFF S-09i
- PERFORM WORK ORDERS
08:30 - 10:00 1.50 MOB P PRE MOVE RIG OFF WELL S -09i AND SPOT ON
PAD AND STAND DOWN
09:15 TOWN ENGINEER SEAN MCLAUGHLIN
CALLED TO NOTIFY US TO STAND DOWN
OPERATIONS UNTIL FURTHER NOTICE DUE
TO NORDIC 1 INCIDENT
10:00 - 11:00 1.00 MOB N WAIT PRE SAFETY MEETING / ROUND TABLE
DISCUSSION WITH NIGHT CREW
11:00 - 12:00 1.00 MOB P PRE SAFETY MEETING/ ROUND TABLE
DISCUSSION WITH DAY CREW
12:00 - 14:00 2.00 MOB P PRE FIELD SAFETY SHUT DOWN
- CONTINUE TO CLEAN RIG AND WORK ON
WORK ORDERS
14:00 - 15:00 1.00 MOB P PRE PJSM
REMOVE BOP FROM CELLAR AND INSTALL
ON BOP MOBILE CRADLE
15:00 - 16:00 1.00 MOB P PRE PJSM
INSTALL REAR BOOSTERS
16:00 - 00:00 8.00 MOB P PRE FIELD SAFETY SHUT DOWN
CONT. WORK ORDERS AND CLEANING
10/18/2011 00:00 - 06:00 6.00 MOB PRE SAFETY STAND DOWN FOR NORDIC 1
INCIDENT, WAIT ON CLEARANCE TO MOVE
RIG,
RIG MAINTENANCE AND CLEANING
06:00 - 12:00 6.00 MOB PRE SAFETY STAND DOWN, WAIT ON
CLEARANCE TO MOVE RIG, WORK ORDERS
AND GENERAL RIG MAINTENANCE
- "UNINTERRUPTED POWER SUPPLY"
QUADCO SYSTEM INSTALLED.
12:00 - 00:00 12.00 MOB PRE CONTINUE TO STAND DOWN
- HARDLINE INSPECTION BY SCS AND RIG
CREW OF RETURNED HARDLINE POST
RE- CERTIFICATION
- GENERAL HOUSEKEEPING AROUND RIG
- PLYWOOD AND HERCULITE INSTALLED IN
CELLAR OF S -102
10/19/2011 00:00 - 06:00 6.00 MOB PRE SAFETY STAND DOWN FOR NORDIC 1
INCIDENT, WAIT ON CLEARANCE TO MOVE
RIG.
- CONTINUE MINOR MAINTENANCE WHILE
WAITING ON ORDERS
Printed 11/14/2011 1:58:56PM
North 4111rica - ALASKA -.BP
Page 2 of 15
Operation:, nary Repay
Common Well Name: S -102 AFE No
Event Type: WORKOVER (WO) Start Date: 10/10/2011 End Date: X4- 00V44 -E (4,700,000.00 )
Project: Prudhoe Bay Site: PB S Pad
Rig Name /No.: DOYON 16 Spud Date/Time: 9/14/2000 12:00:OOAM Rig Release:
Rig Contractor: DOYON DRILLING INC. UWI: 500292297200
Active Datum: S -102 @64.20ft (above Mean Sea Level)
Date From - To Hrs Task Code NPT NPT Depth Phase Description of Operations
(hr) (ft)
06:00 - 12:00 6.00 MOB PRE COMPLETE ALL WORK ORDERS DUE IN
SYSTEM EXCEPT THOSE REQUIRING THE
DERRICK TO BE UP.
12:00 - 00:00 12.00 MOB PRE CONTINUE TO STAND DOWN
- GENERAL HOUSEKEEPING AROUND RIG
10/20/2011 00:00 - 10:00 10.00 MOB N WAIT PRE SAFETY STAND DOWN FOR NORDIC 1
INCIDENT, WAIT ON CLEARANCE TO MOVE
RIG.
- CONTINUE MINOR MAINTENANCE WHILE
WAITING ON ORDERS
24 HOUR NOTICE TO AOGCC FOR INITIAL
BOP TEST
-BOB NOBLE WAIVED STATE'S RIGHT TO
WITNESS AT 08:15
10:00 - 11:00 1.00 MOB P PRE RECEIVED OK TO PROCEED WITH RIG MOVE
ON S -PAD, FROM SOUTH PAD TO NORTH
PAD.
-CALL OUT DOYON DRILLING SUPT
-PREP MOVING SYSTEM FOR MOVE.
-1/2 TO 3/4 OF A GALLON MOP WATER
LEAKED ON TO THE PAD. ALL
NOTIFICATIONS MADE. CLASSIFIED AS A
NON - EVENT.
11:00 - 12:00 1.00 MOB P PRE CREW CHANGE
-PJSM ON RIG MOVE.
ALSO HELD RISK ASSESSMENT MEETING ON
SOP (DRILLING / WORKOVER SURFACE
CLOSE PROXIMITY)
-WITH ADW HSE REP, PAD OPERATOR, 2 BP
WSL'S, TOOLPUSHER AND DRILLER.
- DISCUSSED: 'WELLS INSIDE THE RIG FOOT
PRINT" AND "BACK OVER WELLS'.
- ACTION ITEMS:
-1) PAD OPERATOR TO REPOSITION THE IA
VALVE GAUGE FOR MORE CLEARANCE.
-2) ORDER LIGHT STAND FOR SPOTTING
OVER IN THE DARK.
-3) TEST MOVING SYSTEM ESD PRIOR TO
BACKING OVER.
-4) REQUIRES TOOLPUSHER / TOURPUSHER
AND WSL PRESENT.
-5) ESD IS REQUIRED AT DRILLER STATION IF
A WELL IS PLACED IN SERVICE.
12:00 - 16:00 4.00 MOB P PRE MOVE OFF SOUTH S -PAD
-14:00 HRS AT THE AND BACK DOWN TO
SHORT PAD.
-15:00 HRS MAKER' TURN ON TO RESERVE
PIT ROAD.
-15:30 HRS MAKE SECOND 'R' TURN ON
RESERVE PIT ROAD.
-16:00 HRS ON NORTH S -PAD.
16:00 - 17:30 1.50 MOB P PRE PJSM
- REMOVE FRONT AND REAR BOOSTER
WHEELS.
17:30 - 18:30 1.00 MOB P PRE INSTALL BOPS IN CELLAR
- CALLIBRATE GAS DETECTORS
- FUNTION TEST ESD SWITCH
Printed 11/14/2011 1:58:56PM
i4c ica T ALASKA,' �-. (3P. Page 3 of 15
Opera #ion:Summary R ` ,
Common Well Name: S -102 AFE No
Event Type: WORKOVER (WO) Start Date: 10/10/2011 End Date: X4- 00V44 -E (4,700,000.00 )
Project: Prudhoe Bay Site: PB S Pad
Rig Name /No.: DOYON 16 Spud Date/Time: 9/14/2000 12:00:OOAM Rig Release:
Rig Contractor: DOYON DRILLING INC. UWI: 500292297200
Active Datum: S -102 @64.20ft (above Mean Sea Level)
Date From - To Hrs Task Code NPT NPT Depth Phase Description of Operations
(hr) (ft)
18:30 - 20:30 2.00 MOB P PRE SPOT OVER S -102
- ADJUST CELLAR DOORS FOR 15' WELL
SPACING AND EQUIMENT ON ADJACENT
WELLS
-TP AND BP WSLS PRESENT
20:30 - 22:30 2.00 RIGU P PRE SHIM RIG
-IA PRESSURE = 0 PSI
-SPOT CUTTING BOX, MUD #2 MODULE AND
MOTOR MODULE.
22:30 - 00:00 1.50 RIGU P PRE PJSM
-RAISE DERRICK
-RIG UP RIG FLOOR
10/21/2011 00:00 - 02:00 2.00 RIGU P PRE CONTINUE TO RIG UP RIG FLOOR AND MUD
MANIFOLD EQUIPMENT
- BRIDLE DOWN
02:00 - 02:30 0.50 RIGU P PRE H2S /RIG EVAC DRILL
-HELD AAR WITH CREW AND WSLS
-AAR FINDINGS: PERSONAL H2S MONITORS
NEEDED FOR LOADER OPERATOR AND ANY
GROUPS WORKING OUTSIDE, DISCUSSED
ALTERNATIVE MUSTER AREA IF NORMAL
MUSTER AREAS AREN'T STAGED YET
02:30 - 05:00 2.50 RIGU P PRE RU CIRCULATING LINES AND TEST TO 3500
PSI
-RU DOUBLE ANNULUS VALVE AND 2" LINE
FOR OA BLEED TO SLOP TANK
-BRING ON 440 BBLS OF BRINE INTO PITS,
FLUID WEIGHT 9.75 PPG
05:00 - 07:00 2.00 RIGU P PRE PJSM
-RIG UP AND TEST DSM LUBRICATOR TO 250
PSI LOW AND 3500 PSI HIGH FOR 5 MIN EACH
-PULL BPV AND R/D DSM LUBRICATOR.
-AFTER PULLING BPV TUBING, IA AND OA
PRESSURES ALL 0 PSI
* *ACCEPT RIG AT 06:00 **
07:00 - 08:00 1.00 CLEAN P DECOMP PJSM, RU TO CIRCULATE AND PRESSURE
TEST LINE TO 3500 PSI.
-8.2 BBLS BRINE TO FILL FLUID LINES AND
GAS BUSTER.
08:00 - 10:30 2.50 CLEAN P DECOMP PJSM DISPLACE FREEZE PROTECT OUT OF
WELL.
-PUMP 20 BBLS BRINE DOWN THE IA AT 3
BPM / 320 PSI.
- CIRCULATE 431 BBLS DOWN THE TBG AT 5
BPM / 800 PSI.
- MONITOR WELL FOR 10 MINUTES, NO FLOW.
10:30 - 12:00 1.50 BOPSUR P DECOMP PJSM
-RIG MU AND TEST DSM LUBRICATOR TO 250
PSI LOW AND 3500 PSI HIGH FOR 5 MIN
EACH.
-SET TWC AND R/D DSM LUBRICATOR.
12:00 - 13:00 1.00 BOPSUR P DECOMP TEST TWC FROM BELOW TO 1000 PSI
-TEST TWC FROM ABOVE TO 250 LOW, 3500
PSI
-BOTH TEST CHARTED FOR 10 MINUTES.
-R/D DSM LUBRICATOR.
Printed 11/14/2011 1:58:56PM
North ica - ALASKA - BP Page 4 of 15
Operation Summary: Repot
Common Well Name: S -102 AFE No
Event Type: WORKOVER (WO) Start Date: 10/10/2011 End Date: X4- 00V44 -E (4,700,000.00 )
Project: Prudhoe Bay Site: PB S Pad
Rig Name /No.: DOYON 16 Spud Date/Time: 9/14/2000 12:00:OOAM Rig Release:
Rig Contractor: DOYON DRILLING INC. UWI: 500292297200
Active Datum: S -102 @64.20ft (above Mean Sea Level)
Date From - To Hrs Task Code NPT NPT Depth Phase Description of Operations
(hr) (ft)
13:00 - 13:30 0.50 BOPSUR P DECOMP CALL TOWN RWO ENGINEER,
- DISCUSSED OA TEST.
- RU AND PRESSURE TEST THE OA TO 2000
PSI,
-TEST HELD 1590 PSI FOR 10 MINUTES.
13:30 - 14:30 1.00 BOPSUR P DECOMP DSM DEACTIVATE SSV ELECTRIC MOTOR
-R/D ALL CIRCULATING LINES.
-FMC WELL HEAD REP PREPARE THE
ADAPTER FOR REMOVAL.
14:30 - 17:30 3.00 BOPSUR P DECOMP PJSM WD TREE AND ADAPTER FLANGE.
-CLEAN OUT HANGER AND CHECK NSTC X/O
THREADS FOR PULLING HANGER
-7.75 TURNS TO MAKE -UP
17:30 - 18:30 1.00 BOPSUR P DECOMP PJSM FOR BOP NIPPLE UP
-RIG UP CONTINUOUS FEED LOOP TO IA
18:30 - 00:00 5.50 BOPSUR P DECOMP NU BOPE
-LOAD AND STRAP DRILL PIPE IN PIPE SHED
10/22/2011 00:00 - 08:00 8.00 BOPSUR P DECOMP TESTING 13 -5/8" BOPE TEST BOPE PER
WELL PLAN, PERMIT TO DRILL, AND AOGCC
REGS.
-RAMS TESTED TO 250 PSI LOW AND 3500
PSI HIGH.
- HYDRILL TESTED TO 250 PSI LOW AND 3,500
PSI HIGH
- TEST USING 4 1/2" AND 2 7/8" TEST JOINTS.
- PRESSURE TEST FOR 5 CHARTED MIN.
-ALL TEST WITNESSED BY BP WSL / DDI TP.
-ALL TEST FOLLOW TESTING CRITERIA
DOCUMENTED IN CRT- AK -10 -45
- AOGCC STATE INSPECTOR BOB NOBLE
WAIVED STATES RIGHT OF WITNESS.
ACCUMULATOR DRAW DOWN TEST:
- 2900 PSI DRAW DOWN TO 2050 PSI.
- 200 PSI INCREASE IN 17 SECONDS.
- FULL PRESSURE IN 69 SECONDS.
- 6 N2 BOTTLES @ 2100 PSI.
- ANNULAR= 19 SECONDS.
- BLIND RAMS = 8 SECONDS.
-PIPE RAMS = 14 SECONDS.
NO FAILURES
08:00 - 08:30 0.50 BOPSUR P DECOMP R/D TEST EQUIPMENT
-BLOW DOWN CHOKE LINES.
08:30 - 09:00 0.50 BOPSUR P DECOMP PU / RU DUTCH SYSTEM AND DSM
LUBRICATOR.
09:00 - 09:30 0.50 BOPSUR P DECOMP TEST LUBRICATOR TO 250 PSI LOW / 3500
PSI HIGH FOR 5 CHARTED MINUTES EACH.
-DSM PULLED TWC
09:30 - 10:00 0.50 BOPSUR P DECOMP R/D LUBRICATOR AND DUTCH SYSTEM.
10:00 - 12:00 2.00 PULL N WSEQ DECOMP 4" DP ELEVATORS NOT OPERATING
PROPERLY. BRING NEW ELEVATORS TO
FLOOR AND R/U SAME.
12:00 - 15:00 3.00 PULL P DECOMP BACK OUT LDS, PULL HANGER TO RIG
FLOOR, PULL HANGER OFF SEAT AT 11 OK,
PULL FREE AT 21 OK, PICK UP WT =130K, R/U
CIRC LINES
15:00 - 16:00 1.00 PULL P DECOMP CIRCULATE B/U THROUGH CHOKE, 7 BPM
1550 PSI, R/D CIRC LINES
Printed 11/14/2011 1:58:56PM
North lca, --ALASKA BP Page S n i5
' Operation S mmary Report
Common Well Name: S -102 AFE No
Event Type: WORKOVER (WO) Start Date: 10/10/2011 End Date: X4- 00V44 -E (4,700,000.00 )
Project: Prudhoe Bay Site: PB S Pad
Rig Name /No.: DOYON 16 Spud Date/Time: 9/14/2000 12:00:OOAM Rig Release:
Rig Contractor: DOYON DRILLING INC. UWI: 500292297200
Active Datum: S -102 @64.20ft (above Mean Sea Level)
of Date From - To Hrs Task Code NPT NPT Depth Phase Description o Op erations
(hr) (ft)
16:00 - 16:30 0.50 PULL P DECOMP MONITOR WELL 10 MINUTES, R/U CASING
EQUIP
16:30 - 00:00 7.50 PULL P DECOMP POOH AND UD 4 -1/2 ", 12.6 LB-FT, L80 BTC
TUBING FROM 11,520' TO 6,064'
10/23/2011 00:00 - 06:00 6.00 PULL P DECOMP POOH AND UD 4 1/2 12.6# L80 BTC TUBING
FROM 6064 TO SURFACE
-275 TOTAL JOINTS, 4 GLM'S, TWO "X"
NIPPLES, 3 PUPS.
- JET -CUT WAS MADE IN THE TOP COLLAR OF
THE PACKER.
- RECOVERED 2" OF THE PACKER ASSEMBLY
TOP.
- 1" DIA. HOLE 2' BELOW COLLAR ON TOP 9'
PUP JT OF GLM #1 AT 11387
06:00 - 07:30 1.50 PULL P DECOMP RD TBG HANDLING EQUIPMENT
-LOAD AND STRAP 2 7/8" HT -PAC DP AND 3
1/4" DC, INTO THE PIPE SHED.
-STRAP AND TALLY PIPE.
07:30 - 08:00 0.50 CLEAN P DECOMP INSTALL WEAR RING ID = 7"
08:00 - 10:30 2.50 CLEAN P DECOMP P/U AND M/U 3.75" MILL, BIT SUB, 3 EA 3- 3/4"
DC, 40 EA 2 7/8" DP, X0, X0, 7" CSG
SCRAPER,
BIT SUB, PUMP OUT SUB, X0 SUB = 1368.81
-PUMP A D.P. VOLUME TO CLEAR BHA, 2 BPM
/ 220 PSI.
10:30 - 00:00 13.50 PULL P DECOMP PJSM P/U DP.
-P /U 4" 15.5# DP FROM PIPE SHED 1X1.
- CONTINUOUS HOLE FILL WITH NO GAINS OR
LOSSES.
10/24/2011 00:00 - 00:30 0.50 PULL P DECOMP CONTINUE TO CIRCULATE DP VOLUME.
3 -BPM, 970 -PSI
00:30 - 01:30 1.00 PULL P DECOMP PJSM, CONT. RIH W /DP 1X1 FROM 9,899' TO
10,436' PUW 160K, DW 105.
01:30 - 03:30 2.00 WHSUR P DECOMP PJSM, M/U STORM PACKER, RIH AND SET
PACKER JUST BELOW SURFACE AT 95'. MILL
DEPTH 10,531'
-TEST FROM TOP, 1,000 -PSI, 10 MINUTES
CHARTED (TEST GOOD)
- TESTED BARRIERS: 2 7/8" CBP AT 14,430' MD
AND 7" STORM PACKER AT 95' MD
03:30 - 04:00 0.50 WHSUR P DECOMP P/U RUNNING TOOL & PULL WEAR RING.
04:00 - 06:00 2.00 WHSUR P DECOMP N/D BOPE AND TUBING SPOOL.
06:00 - 10:00 4.00 WHSUR P DECOMP ATTEMPT TO PULL PACK OFF,
UNSUCCESSFUL, CONSULT WITH CONSULT
WITH RWO ENGINEER, RWO
SUPERINTENDENT, FMC TECH AND RIG
TEAM, DEVELOP PLAN FORWARD.
- DECIDE TO LEAVE OLD PACK -OFF IN WELL
HEAD AND INSTALL NEW "REDUCER
BUSHING ", RILDS AND TORQUE
10:00 - 12:30 2.50 WHSUR P DECOMP N/U NEW FMC TUBING SPOOL, INSTALL
DOUBLE ANNULUS VALVES
12:30 - 14:30 2.00 WHSUB P DECOMP TEST FMC 7" CASING PACK -OFF, 3500 -PSI
FOR 30- MINUTES, CHARTED, (TEST GOOD)
14:30 - 16:30 2.00 WHSUR P DECOMP PJSM, N/U BOPE
Printed 11/14/2011 1:58:56PM
North Pag 6 of 1
ICa-ALASKA -;BF'
Operation Sumn ary,.Report
Common Well Name: S -102 AFE No
Event Type: WORKOVER (WO) Start Date: 10/10/2011 End Date: X4- 00V44 -E (4,700,000.00 )
Project: Prudhoe Bay Site: PB S Pad
Rig Name /No.: DOYON 16 Spud Date/Time: 9/14/2000 12:00:OOAM Rig Release:
Rig Contractor: DOYON DRILLING INC. UWI: 500292297200
Active Datum: S -102 @64.20ft (above Mean Sea Level)
Date From - To Hrs Task Code NPT NPT Depth Phase Description of Operations
(hr) (ft)
16:30 - 17:30 1.00 WHSUR P DECOMP PJSM, INSTALL TEST PLUG, R/U TEST
EQUIPMENT
- TEST TUBING SPOOL AND BOP FLANGE
BREAK, 3,500 -PSI, 5- MINUTES CHARTED,
(TEST GOOD)
- R/D TEST EQUIPMENT
17:30 - 22:00 4.50 WHSUR N WSEQ DECOMP UNABLE TO PULL TEST PLUG FROM TUBING
SPOOL, CONSULT WITH RWO ENGINEER,
RWO SUPERINTENDENT, FMC TECH AND RIG
TEAM, DEVELOP PLAN FORWARD.
22:00 - 00:00 2.00 WHSUR N WSEQ DECOMP PJSM, N/D BOPE.
10/25/2011 00:00 - 01:00 1.00 WHSUR N WSEQ DECOMP PJSM, N/D REMOVE STUDS ON TUBING
SPOOL, ATTEMPT TO PULL SPOOL WITH 25K,
UNSUCCESSFUL VISUALLY INSPECT TEST
PLUG AND SPOOL FOR OBSTRUCTIONS,
01:00 - 02:00 1.00 WHSUR N WSEQ DECOMP PJSM, RE- INSTALL STUDS ON TUBING SPOOL
AND BOP, M/U LANDING JT TO TEST PLUG,
TEST PLUG PULLED FREE WITH 40K,
INSPECT TEST -PLUG, INDICATION THAT
LOWER NECK OF TEST PLUG HAD STABBED
INTO THE I.D. OF 7 ", 29# CSG,
APPROXIMATELY 1 -1/2"
02:00 - 03:00 1.00 WHSUR N WSEQ DECOMP REMOVE BOP, INSPECT TUBING SPOOL,
DRIFT 7" CSG AT WELLHEAD WITH 6.059"
DRIFT, DRY RUN NEW TEST PLUG PRIOR TO
INSTALLATION OF BOPE.
03:00 - 04:00 1.00 WHSUR N WSEQ DECOMP N/U TUBING SPOOL
- TEST PACK -OFF VOID, 3,500 -PSI,
30- MINUTES, CHARTED (TEST GOOD)
04:00 - 05:30 1.50 BOPSUR N WSEQ DECOMP PJSM - N/U BOP, INSTALL TEST PLUG
05:30 - 06:00 0.50 BOPSUR N WSEQ DECOMP - TEST BOP FLANGE BREAK 250 -PSI LOW,
3,500 -PSI HIGH, 5- MINUTES EACH, CHARTED
(TEST GOOD) PULL TEST PLUG
06:00 - 06:30 0.50 BOPSUR P DECOMP SET WEAR RING
06:30 - 07:30 1.00 DHB P DECOMP PJSM - DISCUSS ANTICIPATED TRAPPED PSI.
RELEASE STORM - PACKER MONITOR FOR
PRESSURE, (NO PRESSURE OBSERVED)
PULL STORM - PACKER TO FLOOR
- L/D STORM - PACKER
07:30 - 08:30 1.00 CLEAN P DECOMP CIRC. BOTTOMS UP AT 10,436'
- 4 BPM, PSI 920
08:30 - 10:00 1.50 CLEAN P DECOMP P/U DP FROM PIPE -SHED. RIH F/ 10,436 T/
11,321'
PER PROGRAM MAKE ADDITIONAL SCRAPES
AT 11,384' AREA, 4 -TOTAL PASSES (NO
ISSUES)
- CONTINUE RIH TO 11,510'
- PUW 185K, DW 107K
10:00 - 10:30 0.50 CLEAN P DECOMP POOH RACK DP IN DERRICK F/ 11,510' T/
10,373'
10:30 - 11:30 1.00 CLEAN P DECOMP P/U DP FROM PIPESHED RIH WITH SAME F/
10,373 T/ 11,510
11:30 - 17:30 6.00 CLEAN P DECOMP WHILE CIRC. 3 -BPM, 1,750 -PSI, LOAD AND
PREP 4 -1/2" TUBING INTO PIPESHED
- PUW 170K, DW 111K
Printed 11/14/2011 1:58:56PM
North IG8 ALASKA -' RP Page 7 of 15
perataon Summary`Report
Common Well Name: S -102 AFE No
Event Type: WORKOVER (WO) Start Date: 10/10/2011 End Date: X4- 00V44 -E (4,700,000.00 )
Project: Prudhoe Bay Site: PB S Pad
Rig Name /No.: DOYON 16 Spud Date/Time: 9/14/2000 12:00:OOAM Rig Release:
Rig Contractor: DOYON DRILLING INC. UWI: 500292297200
Active Datum: S -102 @64.20ft (above Mean Sea Level)
Date From - To Hrs Task Code NPT NPT Depth Phase Description of Operations
(hr) (ft)
17:30 - 19:00 1.50 CLEAN P DECOMP PJSM- EST. PARAMETERS AT 11,585' IN
PREPARATION TO MILL CBP.
- RIH F/ 11,510', TAG TUBING STUMP AT
11,514'
- TAG CBP AT 11,528'
- PUW 165K, DW 112K, RW 132K, TRQ 7.5K
- PUMP 20 -BBL HI-VIS SWEEP, 5- BPM,
2,390 -PSI
- SPR'S 11,585' 9.8 -PPG
#1 MP, 30 -SPM, 920 -PSI #1 MP, 40 -SPM,
1,290 -PSI
#2 MP, 30 -SPM, 940 -PSI #2 MP, 40 -SPM,
1,670 -PSI
19:00 - 20:00 1.00 CLEAN P DECOMP MILL THROUGH CBP AT 11,528' (CBP MILLED
19:37 HRS) RETURN FLOW 23% WHILE
MILLING, FLOW RETURN REDUCED TO
12 -19% ONCE CBP MILLED.
- 4 BPM, PSI 1,740
- WOB 5K, TRQ 7.5K, 40 RPM.
- POOH TO ABOVE TUBING 4 -1/2 TUBING
STUB T/ 11,510'
20:00 - 21:00 1.00 CLEAN P DECOMP 11,510' SHUT ANNULAR PREVENTER.
BULLHEAD 50 -BBLS OF 9.8 -PPG BRINE
- 7 BPM, PSI 690
- SHUT DOWN PUMP, RECORD PRESSURE -
SIDP 100 -PSI, SICP 100 -PSI
- MONITOR WELL FOR FLOW THROUGH
BLEEDER ON CHOKE
- 8 -BBLS RETURNED THROUGH CHOKE.
SHUT IN MONITOR PRESSURE.
- SIDP 50 -PSI, SICP 50 -PSI
21:00 - 00:00 3.00 CLEAN P DECOMP CBU THROUGH CHOKE. AT B/U NO
INDICATIONS OF GAS OR CONTAMINATED
FLUID.
5 -BPM, PSI 1,670
- DYNAMIC LOSS RATE 90 -BPI-I
- TOTAL LOSS 117 -BBL
- SHUT DOWN MONITOR WELL TO CLOSED
CHOKE. PERFORM EXHALE TEST PER ADW
RP FOR WELLBORE BREATHING TO VERIFY
SUSPECTED FORMATION CHARGE.
- SIDP 50 -PSI, SICP 60 -PSI
- BLEED 10 -BBL T/ TRIP TANK. SHUT IN,
MONITOR, RECORD PSI, SIDP40 -PSI, SICP
40 -PSI
- REPEAT PROCESS IN 10 -BBL INCREMENT.
NO REDUCTION IN SIDPP 40 -PSI, SICP 40 -PSI
- CONSULT RWO ENG. RIG TEAM ON PLAN
FORWARD. MONITOR PRESSURES.
- NO INCREASE OF SIDP 50 -PSI, SICP 50 -PSI
- MW IN 9.8, MW OUT 9.8
10/26/2011 00:00 - 03:30 3.50 CLEAN P DECOMP WELL SHUT IN CONTINUE TO MONITOR
PRESSURES AT 11,510'
- CONSULT AND DISCUSS OPTIONS WITH
RWO ENG. TEAM LEAD AND WELLS
MANAGER.
- MONITOR PRESSURES. SITP 50 -PSI, SICP
50-PSI
- NO INCREASE OF SIDP OR SIDP.
- MW IN 9.8, MW OUT 9.8
Printed 11/14/2011 1:58:56PM
NOrtti I ICa r ALASKA:- BP Page $ of 15
Operation Summary Report
Common Well Name: S -102 AFE No
Event Type: WORKOVER (WO) Start Date: 10/10/2011 End Date: X4- 00V44 -E (4,700,000.00 )
Project: Prudhoe Bay Site: PB S Pad
Rig Name /No.: DOYON 16 Spud Date/Time: 9/14/2000 12:00:OOAM Rig Release:
Rig Contractor: DOYON DRILLING INC. UWI: 500292297200
Active Datum: S -102 @64.20ft (above Mean Sea Level)
Date From - To Hrs Task Code NPT NPT Depth Phase Description of Operations
(hr) (ft)
03:30 - 13:30 10.00 CLEAN P DECOMP MOBILIZE AND PREPARE TO WEIGHT UP
FROM 9.8 -PPG TO 10.4 -PPG
- SITP 50 -PSI, SICP 50 -PSI
- HAVE 409 BBLS OF 10.2 PPG IN THE PITS
AND THREE TRUCKS WITH 10.2 PPG ON
LOCATION
- RECIEVED OPS NOTE # 1 PLAN FORWARD
FROM RWO ENGINEER
13:30 - 14:30 1.00 CLEAN P DECOMP VERIFY WITH TOWN FOR APPROVAL TO
BEGIN CIRCULATING 10.2 KWF
- VERIFY WITH RWO TEAM LEAD AND WELLS
MANAGER.
- DISCUSS CHANGE TO THE OPS NOTE # 1
REV 2 PLAN FORWARD WITH THE ENGINEER
14:30 - 15:00 0.50 CLEAN P DECOMP PJSM WITH CREW FOR NEW PLAN
FORWARD & WELL KILL OPERATION
- DISCUSSION ON FLUIDS MANAGMENT PLAN
- REVIEWED DDI PROCEDURE FOR WELL
KILL OPERATIONS
**GAVE 24 HOUR NOTIFICATION FOR
WEEKLY BOPE TESTING ""
- JOHN CRISP CALLED BACK AND ASKED
FOR AN UPDATE IN THE MORNING.
15:00 - 16:00 1.00 CLEAN P DECOMP PUMPED DP VOLUME OF 116 BBLS OF 10.2
PPG SODIUM BROMIDE, TAKING THE 9.75
PPG RETURNS OUT TO THE SLOP TANK
- HELD 50 PSI ON THE CHOKE DURING
CIRCULATION.
- 3 BPM @ 550 -650 PSI
- SHUT IN AND MONITORED THE WELL FOR
10 MIN, DP PRESSURE GUAGE READING 0
- LOST —15 BBLS DURING THE CIRCULATION
16:00 - 20:00 4.00 CLEAN P DECOMP STARTED PUMPING A BOTTOMS UP WITH
THE 10.2 PPG BRINE
- TAKING RETURNS TO THE SLOP TANK
- HELD 40 -PSI ON THE CHOKE
- PUMPED 2.5 - 4 BPM WITH 400 -750 PSI.
- 10.2 -PPG KWF AT SURFACE WITH A TOTAL
OF 670 -BBL PUMPED.
- DYNAMIC LOSS RATE 180 -BPH
- 19:30 HRS WELL SHUT IN. MONITOR
PRESSURES.
- SIDP 0 -PSI, SICP 0 -PSI
- TOTAL BRINE LOST TO WELL SINCE
COMPOSITE BRIDGE PLUG MILLED. 423 -BBL
Printed 11/14/2011 1:58:56PM
North s tCa = ALASKA Fas 9 of 15
i
Summar e
Common Well Name: S -102 AFE No
Event Type: WORKOVER (WO) Start Date: 10/10/2011 End Date: X4- 00V44 -E (4,700,000.00 )
Project: Prudhoe Bay Site: PB S Pad
Rig Name /No.: DOYON 16 Spud Date/Time: 9/14/2000 12:00:OOAM Rig Release:
Rig Contractor: DOYON DRILLING INC. UWI: 500292297200
Active Datum: S -102 @64.20ft (above Mean Sea Level)
Date From - To Hrs Task Code NPT NPT Depth Phase Description of Operations
(hr) (ft)
20:00 - 21:00 1.00 CLEAN P DECOMP WELL SHUT IN, CONTINUE TO MONITOR
PRESSURES AT 11,510'
- SICP 0 -PSI, SITP 0 -PSI
**CONSULT WITH WELLS MANAGER, TEAM
LEAD, RWO ENG AND RWO SUPT **
- WSL'S GRANTED AUTHORIZATION TO
OPEN WELL AND PROCEED WITH
OPERATIONS
- OPEN WELL. WELL TAKING FLUID,
- EST. STATIC LOSS RATE OF 80 -BPH.
- PER PROCEDURE ADDENDUM, FILL AT
60 -BPH.
- HOLD PJSM WITH RIG TEAM ON FLUID
MANAGEMENT AND WELL OPERATIONS.
- BLOW DOWN TOP - DRIVE, CHOKE AND
GAS - BUSTER
21:00 - 00:00 3.00 CLEAN P DECOMP RIH FROM 11,510' TO 12,730'
- PUW 160K, DW 117K
- SCRAPE PACKER SETTING DEPTH FROM
11,340' TO 11,365'
- CONTINUE TO FILL 60 -BPH
12,730' - PJSM FOR POOH WITH DP.
- MW IN 10.2 -PPG, MW OUT 10.2 -PPG
- STATIC LOSS RATE 76 -BPH
10/27/2011 00:00 - 00:30 0.50 CLEAN P DECOMP POOH FROM 12,730' TO 11,510'
- PUW 170K, DW 110K
- FILL HOLE AT 60 -BPH
- STATIC LOSS RATE 76-BPI-I
00:30 - 01:30 1.00 CLEAN P DECOMP PJSM - CUT AND SLIP DRILLING LINE
- FILL HOLE AT 60 -BPH
01:30 - 04:00 2.50 CLEAN P DECOMP POOH UD JNTS DP TO PIPE -SHED FROM
11,510T08,856'
- FILL HOLE AT 60 -BPH
04:00 - 05:00 1.00 CLEAN N RREP 8,855.98 DECOMP REPLACE FRAYING CABLE ON SKATE.
05:00 - 14:00 9.00 CLEAN P DECOMP CONTINUE POOH UD 4" 14# DP FROM 8,856'
TO 1368'
- LAYING DOWN SNGLES TO THE PIPE SHED
AOGCC CALLED BACK AND WAIVED THE
RIGHT TO WITNESS FOR OUR WEEKLY BOPE
TESTING.
14:00 - 16:00 2.00 CLEAN P DECOMP MONITOR WELL FOR FLOW BEFORE
PULLING BHA THRU THE STACK
- BREAK AND LAY DOWN 2 -7/8" HT PAC AND
3 -3/4" MILLING ASSEMBLY
16:00 - 18:30 2.50 BOPSUR P DECOMP CLEAN AND CLEAR RIG FLOOR
- PULL WEAR RING
- RU CONTINUOUS HOLE FILL LINE TO BE
USED DURING BOP TESTING
- RU BOPE TESTING EQUIPMENT
18:30 - 19:30 1.00 BOPSUR P DECOMP PJSM- INSTALL TEST PLUG
- GREASE CHOKE MANIFOLD VALVES
- FILL BOPE AND TEST EQUIPMENT WITH
H20.
- RU TO TEST BOPE
Printed 11/14/2011 1:58:56PM
North . ICS - ALASKA -.CAP 10.a
• Page f 15 -
.
O eration Summa Re o
Common Well Name: S -102 AFE No
Event Type: ORKOVER O
( W Start Date: 10/10/2011 End Date: X4- 00V44 -E (4,700,000.00 )
e: )
Project: Prudhoe Bay Site: PB S Pad
Rig Name /No.: DOYON 16 Spud Date/Time: 9/14/2000 12:00:OOAM Rig Release:
Rig Contractor: DOYON DRILLING INC. UWI: 500292297200
Active Datum: S -102 @64.20ft (above Mean Sea Level)
Date From - To Hrs Task Code NPT NPT Depth Phase Description of Operations
(hr) (ft)
19:30 - 00:00 4.50 BOPSUR P DECOMP TESTING 13 -5/8" BOPE TEST BOPE PER
WELL PLAN, PERMIT TO DRILL, AND AOGCC
REGS.
- RAMS TESTED TO 250 -PSI LOW AND
3500 -PSI HIGH.
- HYDRILL TESTED TO 250 -PSI LOW AND
3,500 -PSI HIGH
- TEST USING 4 -1/2" AND 3 -1/2" TEST JOINTS.
- PRESSURE TEST FOR 5 CHARTED MIN
EACH TEST.
- ALL TEST WITNESSED BY BP WSL / DDI TP.
- ALL TEST FOLLOW TESTING CRITERIA
DOCUMENTED IN CRT- AK -10 -45
- AOGCC STATE INSPECTOR JOHN CRISP
WAIVED WITNESS.
ACCUMULATOR DRAW DOWN TEST:
- 2900 PSI DRAW DOWN TO 1600 PSI.
- 200 PSI INCREASE IN 22 SECONDS.
- FULL PRESSURE IN 103 SECONDS.
- 6 N2 BOTTLES @ 2100 PSI.
** NO FAILURES **
10/28/2011 00:00 - 01:00 1.00 BOPSUR P DECOMP CONTINUE TESTING 13 -5/8" BOPE. TEST
BOPE PER WELL PLAN, PERMIT TO DRILL,
AND AOGCC REGS.
ACCUMULATOR DRAW DOWN TEST:
- 2900 PSI DRAW DOWN TO 1600 PSI.
- 200 PSI INCREASE IN 22 SECONDS.
- FULL PRESSURE IN 103 SECONDS.
- 6 N2 BOTTLES @ 2100 PSI.
01:00 - 01:30 0.50 BOPSUR P DECOMP RD BOP TEST EQUIPMENT. BLOW DOWN
LINES AND CHOKE MANIFOLD.
01:30 - 04:00 2.50 RUNCOM P RUNCMP RU 3 -1/2" TUBING RUNNING EQUIPMENT AND
SLB I -WIRE SPOOLER,
04:00 - 07:00 3.00 RUNCOM P RUNCMP PJSM- PU 3 -1/2 ", 9.3#, 13CR -80 ST -L TAILPIPE
ASSEMBLY
- RIH WITH TUBING PER PROGRAM WITH 40
JNTS,1222.41'
- TORQUE TURN SERVICES & SINGLE JOINT
COMPENSATOR FOR PREMIUM
CONNECTIONS
- USE "JET LUBE SEAL GUARD" THREAD
COMPOUND
- CONTINUOUS HOLE FILL AT 60 BPH
07:00 - 21:00 14.00 RUNCOM P RUNCMP RUN 4 -1/2" 12.6# VAM TOP WITH 7" BY 4 -1/2"
HES TNT PACKER.
- RIH TO 1,403' PU HES TNT PACKER, VERIFY
PACKER S/N AND VISUAL INTEGRITY
- RIH TO 1,507' PU SLB NDPG -C GUAGE
MANDREL AND CONNECT I -WIRE.
- CONTINUE RIH WITH 4 -1/2" 12.6# VAM TOP
13CR -85, USING TORQUE TURN SERVICES
AND SINGLE JOINT COMPENSATOR.
- TRQ EACH JOINT TO 4,440 FT /LBS
- BAKER -LOC ALL 4 -1/2" CONNECTIONS
BELOW THE PACKER
- VERIFY THE I -WIRE CONTINUITY AND
GAUGE FUNCTION EVERY 10 JOINTS.
- CONTINUOUS HOLE FILL STILL AT 60 BPH.
Printed 11/14/2011 1:58:56PM
North Ica ALASKA - E3P , Page 11 of 15
•
Operation Summary Report
•
Common Well Name: S -102 AFE No
Event Type: WORKOVER (WO) Start Date: 10/10/2011 End Date: X4- 00V44 -E (4,700,000.00 )
Project: Prudhoe Bay Site: PB S Pad
Rig Name /No.: DOYON 16 Spud Date/Time: 9/14/2000 12:00:OOAM Rig Release:
Rig Contractor: DOYON DRILLING INC. UWI: 500292297200
Active Datum: S -102 @64.20ft (above Mean Sea Level)
Date From - To Hrs Task Code NPT NPT Depth Phase Description of Operations
(hr) (ft)
21:00 - 21:30 0.50 RUNCOM P RUNCMP D -1 DRILL (KICK WHILE TRIPPING) WITH
C -CREW
- TABLE TOP DISCUSSION WITH RIG
PERSONNEL
- DISCUSS MULTIPLE SCENARIO BASED
SITUATIONS AND GRADUATED COMPLEXITY
OF THE DRILL. - DISCUSS POTENTIAL
HAZARDS OF THE I -WIRE AND EXTRA
PERSONNEL ON THE RIG.
- REVIEW CREW MEMBERS ROLL AND
RESPONSIBILITY DURING WELL CONTROL
EVENTS.
21:30 - 00:00 2.50 RUNCOM P RUNCMP CONTINUE TO RUN 4 -1/2" 12.6# VAM TOP
COMPLETION. FROM 6,503' TO 7,908'
- UTILIZE TORQUE TURN SERVICES AND
SINGLE JOINT COMPENSATOR.
- VERIFY THE I -WIRE CONTINUITY AND
GAUGE FUNCTION EVERY 10 JOINTS.
- USE "JET LUBE SEAL GUARD" THREAD
COMPOUND
- PUW 110K, DW 84K
** LOSSES LAST 24 HRS 1,361 -BBLS **
** LOSS AVERAGE 57 -BPH **
10/29/2011 00:00 - 01:30 1.50 RUNCOM P RUNCMP CONTINUE TO RUN 4 -1/2" 12.6# VAM TOP
COMPLETION. FROM 7,908' TO 8,450'
- UTILIZE TORQUE TURN SERVICES TRQ TO
4,440 FT /LBS
- UTILIZE SINGLE JOINT COMPENSATOR.
- VERIFY THE I -WIRE CONTINUITY AND
GAUGE FUNCTION EVERY 10 JOINTS.
- USE "JET LUBE SEAL GUARD" THREAD
COMPOUND
01:30 - 02:30 1.00 RUNCOM N RREP RUNCMP 01:30 HRS
5- GALLONS OF 10.2 PPG BRINE LEAKED
FROM AIR -BOOT ON THE DRILLING NIPPLE/
RISER. ALL FLUID CONFINED TO RIG AND
WITHIN CONTAINMENT.
- NOTIFY PROPER AUTHORITIES, PER LEVEL
"0" NOTIFICATION LIST.
- NOTIFICATION GIVEN TO #5700, SENIOR
WSL, OPS SUPERINTENDENT, S -PAD
OPERATOR, GC2 FACILITY AND HSE.
- MITIGATE AND REPAIR LEAKING AIR -BOOT.
DISCUSS SPILL PREVENTION WITH RIG
TEAM.
- TRACTION IR PENDING
MONITOR STATIC LOSS TO WELL WHILE
REPAIRING.
- STATIC LOSS OF 57 -BBUHR
02:30 - 08:30 6.00 RUNCOM P RUNCMP CONTINUE TO RUN 4 -1/2" 12.6# VAM TOP
COMPLETION. '
- TIH FROM 8,450' TO 11,510' JUST ABOVE
THE 4 -1/2" STUB AND PACKER.
- 135K PUW , 97K SOW
- RIH & TAG STUB AT 11,521' TUBING
MEASUREMENT.
Printed 11/14/2011 1:58:56PM
. North Ica - ALASKA - BP . Pag e'12 of 15
Operation Summary`Report
Common Well Name: S -102 AFE No
Event Type: WORKOVER (WO) Start Date: 10/10/2011 End Date: X4- 00V44 -E (4,700,000.00 )
Project: Prudhoe Bay Site: PB S Pad
Rig Name /No.: DOYON 16 Spud Date/Time: 9/14/2000 12:00:OOAM Rig Release:
Rig Contractor: DOYON DRILLING INC. UWI: 500292297200
Active Datum: S -102 @64.20ft (above Mean Sea Level)
Date From - To Hrs Task Code NPT NPT Depth Phase Description of Operations
(hr) (ft)
08:30 - 14:00 5.50 RUNCOM P RUNCMP ATTEMPT TO GUIDE THE 3 -1/2" HALF MULE
SHOE INTO THE THE 4 -1/2" STUB AT 11,521'
- PU & SLACK OFF SEVERAL TIMES, MAX 5K
DOWN WEIGHT.
- RIG DOWN SINGLE JOINT COMPENSATOR
AND MU TIW WITH VAM TOP XO.
- MAKE UP TIW AND AND TOP DRIVE
- PUMP 3-4 BPM WITH 150 -250 PSI , WHILE
ATTEMPTING TO GUIDE THE MULE SHOE
INTO THE 4 -1/2" STUB. FAILED SEVERAL
ATTEMPTS.
- CONTACTED RWO ENGINEER AND SUPT TO
DISCUSS PLAN FORWARD.
- PLAN FORWARD IS TO PULL SLACK IN THE
I -WIRE AND IMPUT 3 ROTATIONS IN THE PIPE
IN AN ATTEMPT TO ROLL THE MULE SHOE
INTO THE 4 -1/2" STUB.
- CONTINUOUS HOLE FILL MAINTAINED AT
40 -45 BPH.
14:00 - 14:30 0.50 RUNCOM P RUNCMP HELD A TABLE TOP PJSM TO DISCUSS WHAT
WERE GOING TO ATTEMPT.
- PULLED SLACK IN THE I -WIRE , PUT 3 FULL
TURNS IN THE 4 -1/2" TUBING.
- HELD 2K DOWN WEIGHT AND
RECIPROCATED THE PIPE UP AND DOWN.
- THE MULE SHOE FINALLY ROLLED INTO
THE 4 -1/2" STUB.
- SLB PERFORMED A CONTINUITY TEST AND
EVERYTHING CHECKED OUT GOOD.
14:30 - 15:30 1.00 RUNCOM P RUNCMP PJSM TO RE -GROUP AFTER THE CHANGE IN
SCOPE, DISCUSSED RUNNING THE LONG
TAILPIPE ASSEMBLY INTO THE 4 -1/2" LINER.
- MAKE UP THE SINGLE JOINT
COMPENSATOR AND TUBING RUNNING
EQPT.
- STATIC LOSS RATE — 40 BPH
15:30 - 17:00 1.50 RUNCOM P RUNCMP CONTINUE TO RUN 4 -1/2" 12.6# VAM TOP
COMPLETION. '
- RIH FROM 11,521' TOP OF LINER TO 12,720'
- CONTINUOUS HOLE FILL MAINTAINED AT 40
BPH.
17:00 - 19:00 2.00 RUNCOM N RREP RUNCMP RIG MISPLACED ORIGINAL CROSSOVER FOR
JOB, M/U TIW VALVE AND CROSSOVERS
19:00 - 19:30 0.50 RUNCOM P RUNCMP PU TCII LANDING JOINT, MAKE UP CROSS
OVERS AND TIW VALVE.
- MAKE UP FMC, 13 -5/8" X 4 -1/2" TCII TUBING
HANGER
19:30 - 20:30 1.00 RUNCOM P RUNCMP TERMINATE I -WIRE
- FMC TEST HANGER TO 5,000 -PSI FOR
10- MINUTES
20:30 - 21:00 0.50 RUNCOM P RUNCMP LAND HANGER, VERIFY RKB
MEASUREMENTS
- RUN IN LDS AND UD LANDING JNT.
- 12,720' PUW 140K, DW 100K
'CLAMPS RAN"
FULL CLAMPS= 175
1/2 CLAMPS= 9
TOTAL CLAMP =184
Printed 11/14/2011 1:58:56PM
North " %ca - ALASKA -BP. , . Page 13'of15
•
Operat Summa Report.
Common Well Name: S -102 AFE No
Event Type: WORKOVER (WO) Start Date: 10/10/2011 End Date: X4- 00V44 -E (4,700,000.00 )
Project: Prudhoe Bay Site: PB S Pad
Rig Name /No.: DOYON 16 Spud Date/Time: 9/14/2000 12:00:OOAM Rig Release:
Rig Contractor: DOYON DRILLING INC. UWI: 500292297200
Active Datum: S -102 @64.20ft (above Mean Sea Level)
Date From - To Hrs Task Code NPT NPT Depth Phase Description of Operations
(hr) (ft)
21:00 - 23:00 2.00 RUNCOM P RUNCMP PJSM- P/T LINES TO 4,000 PSI.
- PUMP 200 -BBLS. 10.2 -PPG BRINE WITH
CORROSION INHIBITOR.
- 3 -BPM , 960 -PSI
23:00 - 23:30 0.50 RUNCOM P RUNCMP P/U AND INSTALL LANDING JNT, DROP BALL
AND ROD WITH ROLLERS TO SEAT IN RHC.
- UD LDG JNT
- BLOW DOWN LINES, ATTEMPT TO OBTAIN
LOW PRESSURE TEST ON TBG.
23:30 - 00:00 0.50 RUNCOM P RUNCMP TROUBLESHOOT AND ISOLATE LEAKING
VALVES ON SQUEEZE MANIFOLD IN CELLAR.
- CHANGE TWO HALLIBURTON PLUG VALVES
TOTAL.
"" TOTAL 24 -HR LOSS TO WELL 749 - BBL""
10/30/2011 00:00 - 00:30 0.50 RUNCOM P RUNCMP CONTINUE TO CHANGE OUT HALLIBURTON
VALVES ON SQUEEZE MANIFOLD.
- PT LINES AND VALVES TO 4,000 -PSI; TEST
GOOD
00:30 - 02:00 1.50 RUNCOM P RUNCMP ATTEMPT LOW PT ON TBG. NO GOOD,
- DETERMINE BALL AND ROD LEAKING PAST
RHC.
- CONSULT RWO ENG. GET APPROVAL TO
SET PACKER PER PROGRAM.
02:00 - 03:00 1.00 RUNCOM P RUNCMP PRESSURE UP ON THE TUBING, PUMPING
DOWN THE KILL LINE.
- OBSERVE PACKER SET AT 1,950 -PSI.
- CONTINUE TO PRESSURE TO 3,500 -PSI.
CHART TEST 30 -MIN.
- TBG 20 -PSI OVERALL PRESSURE LOSS
OVER 30 -MIN
- 20 -PSI FIRST 15 -MIN.
- 0 -PSI LOST LAST 15 -MIN.
* TEST PASSED CRT- AK -10 -45 CRITERIA'
- BLEED TUBING DOWN TO 1,500 -PSI
03:00 - 04:00 1.00 RUNCOM P RUNCMP PRESSURE TO 4,000 -PSI ON 4 -1/2" X 7" IA
FOR 30 -MIN CHARTED
- OVERALL PRESSURE LOSS OF 90 -PSI
- 90 -PSI FIRST 15 -MIN
- 0 -PSI LOST LAST 15 -MIN.
- TEST PASSED CRT- AK -10 -45 CRITERIA
- VERIFY THE COMPETENCY OF THE
PRESSURE TEST WITH OPERATION
MANAGER AND RWO ENG.
GRANTED APPROVAL TO PROCEED.
SHEAR DCK VALVE
- CIRCULATE DOWN TBG 2 -BPM, 720 -PSI
- CIRCULATE DOWN IA 2 -BPM, 690 -PSI
VERIFICATION OF ABILITY TO PUMP BOTH
WAYS
04:00 - 05:30 1.50 RUNCOM P RUNCMP FMC REP DRY ROD IN THE 4" H STYLE TWC,
- PRESSURE TEST FROM BELOW TO
1,000 -PSI. TEST 3,500 -PSI FROM ABOVE.
10 -MIN ON EACH TEST.
05:30 - 08:30 3.00 RUNCOM P RUNCMP ND 13 -5/8" 5K HYDRILL BOPE
- CLEAN & CLEAR CELLAR.
- BARRIERS ARE THE BALL ON ROD SEAT ,
KWF & 4" TESTED (H) STYLE TWC
Printed 11/14/2011 1:58:56PM
- Pa 0'14 of 15
Natth Ica = .ALASKA ° - BP :: ' %` 9
O :a .ation.Sumipa : Repo.rt
Common Well Name: S -102 AFE No
Event Type: WORKOVER (WO) Start Date: 10/10/2011 End Date: X4- 00V44 -E (4,700,000.00 )
Project: Prudhoe Bay Site: PB S Pad
Rig Name /No.: DOYON 16 Spud Date/Time: 9/14/2000 12:00:OOAM Rig Release:
Rig Contractor: DOYON DRILLING INC. UWI: 500292297200
Active Datum: S -102 @64.20ft (above Mean Sea Level)
Date From - To Hrs Task Code NPT NPT Depth Phase Description of Operations
(hr) (ft)
08:30 - 13:00 4.50 RUNCOM P RUNCMP PJSM FOR NU OF TREE
- NU 13 -5/8" 5K X 4- 1/16" ADAPTER FLANGE
AND DRY HOLE TEE
- SLB TESTING CONTINUITY
- FMC REP TESTING HANGER VOID AND SEAL
TO 250 PSI LOW AND 5000 PSI FOR 30
CHARTED MIN.
- CONTINUITY TEST (FAILED)
- REMOVE ADAPTER FLANGE TO INSPECT
I -WIRE
- WAS DISCOVERED THAT THE 1 -WIRE WAS
DAMAGED WHEN THE ADAPTER FLANGE
WAS MADE UP.
SLB WAS ABLE TO USE SOME SLACK IN THE
I -WIRE TO REPAIR IT AND TERMINATE IT
THRU THE ADAPTER FLANGE.
13:00 - 13:30 0.50 RUNCOM N WSEQ RUNCMP FMC REP RE- TESTING HANGER VOID AND
I FOR 30
SEAL TO 250 PSI LOW AND 5000 PSI
CHARTED MIN.
13:30 - 14:30 1.00 RUNCOM P RUNCMP PJSM FOR
- NU DRY HOLE TREE
- PRESSURE TEST TREE TO 5,000 -PSI FOR 5
CHARTED MINUTES.
14:30 - 16:30 2.00 RUNCOM P RUNCMP RU DSM LUBRICATOR
- PRESSURE TEST 250 -PSI LOW, 3,500 -PSI
HIGH FOR 5- CHARTED MINUTES.
- PULL TWC WITH DSM LUBRICATOR
16:30 - 17:30 1.00 RUNCOM P RUNCMP RU LITTLE RED HOT OIL TO FREEZE
PROTECT
17:30 - 20:30 3.00 RUNCOM P RUNCMP PREP RIG FOR UD DERRICK AND MOVE TO
L -205 WHILE LITTLE RED STAGING DIESEL
** 18:45 HRS. FIRE REPORTED AT MOBILE
PAD, VEHICLE FIRE. TRUCK WAS A CHM2H.
INFORM PROPER AUTHORITIES. CMH2H
HANDLING TRACTION. IR # 3979649 **
20:30 - 22:00 1.50 RUNCOM P RUNCMP PJSM- FOR FREEZE PROTECT
- PRESSURE TEST LINES TO 250 -PSI LOW,
3,500 -PSI HIGH
- PUMP 81 -BBLS HEATED DIESEL DOWN IA
- CIRCULATE FREEZE 2 -BPM, ICP 880 -PSI,
FCP 1,300 -PSI
22:00 - 23:30 1.50 RUNCOM P RUNCMP LINE UP AND ALLOW DIESEL TO U -TUBE,
FREEZE PROTECTING TUBING AND
ANNULUS TO 2,200' -MD
- IA PRESSURE STABILIZED AT 230 -PSI
23:30 - 00:00 0.50 RUNCOM P RUNCMP BLOW DOWN LINES, RU DSM LUBRICATOR
TO INSTALL BPV.
10/31/2011 00:00 - 01:00 1.00 WHSUR P RUNCMP RU DSM LUBRICATOR
- PRESSURE TEST LUBRICATOR TO 250 -PSI
LOW, 3,500 -PSI HIGH FOR 5- CHARTED
MINUTES
01:00 - 02:00 1.00 WHSUR P RUNCMP SET 'H' BPV WITH LUBRICATOR IN TUBING
HANGER
- TEST BPV WITH LRS FROM BELOW TO
1,000 -PSI FOR 10- CHARTED MIN. TEST GOOD
- IA 270 -PSI, TBG 50 -PSI
02:00 - 03:00 1.00 WHSUR P RUNCMP BLOW DOWN CIRC. LINES.
- RD LRS,
- RD DSM LUBRICATOR
Printed 11/14/2011 1:58:56PM
North i - ALASKA -'k3F. Page, of 15
4:5004 ion Summary Rep
Common Well Name: S -102 AFE No
Event Type: WORKOVER (WO) Start Date: 10/10/2011 End Date: X4- 00V44 -E (4,700,000.00 )
Project: Prudhoe Bay Site: PB S Pad
Rig Name /No.: DOYON 16 Spud Date/Time: 9/14/2000 12:00:OOAM Rig Release:
Rig Contractor: DOYON DRILLING INC. UWI: 500292297200
Active Datum: S -102 @64.20ft (above Mean Sea Level)
Date From - To Hrs Task Code NPT NPT Depth Phase Description of Operations
(hr) (ft)
03:00 - 04:00 1.00 WHSUR P RUNCMP CLEAN AND CLEAR CELLAR
- SECURE TREE
- RD MUD MANIFOLD
**RIG RELEASED FROM S -102 10/31/2011
00:01 HRS.""
** REFER TO L -205 FOR ADDITIONAL
DETAILS **
Printed 11/14/2011 1:58:56PM
WELLHEAD= 41/16 "FM DRAFT / - 1 02 CH E BG * *CAUTO SWSRADIOACTIVE
ACTUATOR = LEO SOURCES P &A'd 10 /04 /00 w/ RED CMT TO PB 8017 MD
KB. ELEV = 64.2' L1 /4655' TVD. 1) 8564' MD/4882' TVD -2.0 CURIE CS -137.
BF. ELEV = 1 2) 8531' MD/4867' TVD -4.0 CURIE AM - 241 ** DO NOT
KOP = 1400' RE -ENTER WELL BELOW PB DEPTH BEFORE CALLING
Max Angle = 93° @ 12497' 20" CONDUCTOR, - 1 110' _ **
Datum MD = 11724' 91.5 #, H - 40, U.S. NUCLEAR REG COMMISSION & AK DEPT OF O &G
Datum TVD = 6700' SS ID = 19.124" L 2206' 1 1 4 -1 /2" HES X NIP, ID = 3.813" 1
II
10 -3/4" TAM PORT COLLAR I-1 982' ,
GAS LIFT MANDREL
17" PORT COLLAR H 2185' ST MD TVD DEV TYPE VLV LATCH PORT DATE
10 -3/4" CSG, 45.5 #, K- 55 -BTC, ID = 9.95" 1� 4816' 4 5830 3740 67 KBG -2 -LS DOME INT 16 11/20/03
3 9052 5247 53 KBG -2 -LS DOME INT 16 11/20/03
I7" PORT COLLAR 1 J 1 6992' I - = L - 2 10429 6084 54 KBG -2 -LS DMY INT 0 04/15/10
14 -1/2" NDPG -C GAUGE MANDREL, ID = 3.958" H 11212' 1 - + 1 11136 6505 53 KBG 2 LS EMPTY INT - 08/13/11
' i1 11287 1--14 -1/2" HES X NIP, ID = 3.813" I
Minimum ID = 2.377" @ 13272' g
3- 3/16" X 2 -7/8" XO 2..%.. 11316' 1-17" X 4 -1/2" HES TNT PKR, ID = 3.856" 1
11351' H4 -1/2" HES X NIP, ID = 3.813" 1
' iihs. 11421' H4-1/2" HES XN NIP, ID = 3.725" 1
4 -1/2" TBG, 12.6 #, 13CR -85 VAM TOP, - 11447' 1---
.0152 bpf, ID = 3.958" 11446' H4 -1/2" X 3 -1/2" XO, ID = 2.972" 1
14-1/2" TBG STUB (09/20/11) I-) 11520' 1--
∎� 11524' I X 4 -1/2" BKR S -3 PKR, ID = 3.875" 1
/
,1 11543' I - 1 7.40' TIEBACK SLV, ID = 5.25" I
TOP OF 4-1/2" LNR I-1 11543' I 11547' 1 HES X NIP, ID = 3.813" 1
4 -1/2" TBG, 12.6 #, L -80 IBT, H 11558' 1 11550' I X 5" BKR LTP, ID = 4.406" 1
.0152 bpf, ID = 3.958"
11557' 1-17" X 4 -1/2" BKR HMC HGR, ID = 3.938" I
7" CSG, 29 #, L-80-BTC-M, -1 11717' 11559' 1 14 -1/2" WLEG, ID = 4.00" I
.0371 bpf, ID = 6.182"
11553' 1 - I ELMD TT LOGGED 12/12/00 1
3 -1/2" TBG, 9.3 #, 13CR - 80 STL H 12690' I _ ft
.0087 bpf, ID = 2.972"
4 -1/2" WHIPSTOCK (10/26/03) -L 12827' * p� 12264' H HES TYPE H CEMENTER, MILLED TO 3.80" (10/8/03) 1
w/ RA TAG @ 12836'
.1 1 12267' I - 4 -1/2 "BKR CTC EXTERNAL PKR, ID = 3.875" 1
4 -1/2" SLTD LNR, 12.6 #, L -80 IBT, - 12827 I
.0152 bpf, ID = 3.958" W 1 12720' H3 -1/2" HALF MULESHOE, ID = 3.00" 1
PERFORATION SUMMARY 12737' H3-1/2" BKR DEPLOY SLV, ID = 3.00" 1
REF LOG: PDS JEWELRY LOG ON 12/11/00 12740' H3-1/2" x 3- 3/16" XO, ID = 2.786"
ANGLE AT TOP PERF: 73° @ 11660' '
Note: Refer to Production DB for historical perf data MILLOUT WINDOW (S 102L1) 12827' - 12833'
SIZE 1 SPF 1 INTERVAL 1 Opn /Sqz 1 DATE . ,
SEE PAGE 2 FOR PERFORATION DATA 13272' H3- 3/16" X 2 -7/8 XO, ID = 2.377" 1
I I mo- ---I 14430' 1 - 12 - 7/8" WFD CIBP (12 -2206) 1
3- 3/16" LNR, 6.2 #, L -80 TCII, .0076 bpf ID = 2.805" I 13272' I� I ? ? H FISH - KO TOOL SPRINGS 11/19/03
I PBTD 1 14935'
? ? - IBP ELEMENTS (03/14/04 1
12-7/8" LNR, 6.16 #, L -80 STL, .0058 bpf, ID = 2.441" I 14968'
DATE REV BY COMMENTS DATE REV BY COMMENTS AURORA UNIT
10/24/00 COMPLETION WELL: S -102L1
11/05/03 TM N/TLP CTD SIDETRACK (L1) PERMIT No: 2001290 , 2031560
10/31/11 0-16 RWO I API No: 50- 029 - 22972 -01.60
11/13/11 PJC DRLG DRAFT CORRECTIONS SEC 35, T12N, R12E, 828' FNL & 781' FWL
BP Exploration (Alaska)
•
BP Exploration (Alaska) Inc.
Attn: Well Integrity Coordinator, PRB-20
Post Office Box 196612
Anchorage, Alaska 99519-6612
June 25, 2009
Mr. Tom Maunder
Alaska Oil and Gas Conservation Commission
333 West 7th Avenue
Anchorage, Alaska 99501
Subject: Corrosion Inhibitor Treatments of S-Pad
Dear Mr. Maunder,
~p3 - lu~~o
~_ ~b~ ~. ~
Enclosed please find a spreadsheet with a list of wells from S-Pad that were treated
with corrosion inhibitor in the surface casing by conductor annulus. The corrosion
inhibitor is engineered to prevent water from entering the annular space and causing
external corrosion that could result in a surface casing leak to atmosphere. The
attached spreadsheet represents the well name, top of cement depth prior to filling and
volumes of corrosion inhibitor used in each conductor.
As per previous agreement with the AOGCC, this letter and spreadsheet serve as
notification that the treatments took place and meet the requirements of form 10-404,
Report of Sundry Operations.
If you require any additional information, please contact me or my alternate, Anna Dube,
at 659-5102.
Sincerely,
~~~~~~~ ~U~. ti~ '~ ~~C i
.
~
~ ~
JUL 0 ~. 2009
~l~~~a ~il ~ ~as Con~a CommissQO~
Anc~a~~~~
Torin Roschinger
BPXA, Well Integrity Coordinator
• •
BP Exploration (Alaska ) Inc.
Surface Casing by Conductor Annulus Cement, Corrosion inhibitor, Sealant Top-off
Report of Sundry Operations (10-404)
S-pad
oAee
6/25/2009
Well Name
PTD #
Initial top of
cement
Vol. of cement
um ed
Final top of
cement
Cement top oft
date
Cortosian
inhibitor Corrosion
inhibitod
sealant date
ft bbls ft na al
S-O78 1952020 025 NA 025 NA 2.6 5/30/2009
S-02A 1941090 0.25 NA 025 NA 1.7 5/25/2009
5-03 1811900 1325 NA 13.25 NA 92.65 5/20/2009
S-04 1830790 0 NA 0 NA 0.9 5/25/2009
S-05A 1951890 0 NA 0 NA o.s 5/26/2009
5-06 1621650 0 NA 0 NA 0.9 5/26/2009
S-07A 1920980 0 NA 0 NA 0.9 5/26/2009
S-OBB 2010520 0 NA 0 NA 0.85 5/27/2009
S-09 1821040 1.5 NA 1.5 NA 9.4 5/31f2009
S-10A 1917230 0.5 NA 0.5 NA 3.4 5/31/2009
S-118 1990530 025 NA 0.25 NA 7.7 5/27/2009
S42A 1851930 025 NA 025 NA 1J 6/1/2009
5-13 1821350 8 NA 8 NA 55.3 6/1/2009
S-15 1840170 025 NA 025 NA 3 6J2(2009
S-17C 2020070 025 NA 025 NA 2.8 6/1/2009
S-18A 2021630 0.5 NA 0.5 NA 3 6/2/2009
S-19 1861160 0.75 NA 0.75 NA 22 5/19/2009
S-20A 2010450 025 NA 0.25 NA 1.3 S/19/2009
5-21 1900470 0.5 NA 0.5 fJA 3.4 5/25/2009
S-22B 1970510 0.75 NA 0.75 NA 3 5/19/2009
S-23 1901270 025 NA 025 NA 1.7 5/25/2009
5-248 2031630 0.5 NA 0.5 NA 2.6 5/25/2009
S-25A 1982140 0.5 NA 0.5 NA 2.6 5I25/2009
5-26 1900580 0.75 NA 0.75 NA 3.4 5/26/2009
S-27B 2031680 0.5 NA 0.5 NA 2.6 5/31/2009
S-29B 2030020 0.5 NA 0.5 NA 2.6 5/37I2009
S-29AL1 1960120 0 NA 0 NA 0.85 5/27/2009
S-30 1900660 0.5 NA 0.5 NA 5.1 5/31/2009
S31A 1982200 0.5 NA 0.5 NA 3.4 5/26/2009
S-32 1901490 0.5 NA 0.5 NA 3.4 5/31/2009
5-33 1921020 0.5 NA 0.5 NA 4.3 5/26/2009
S-3a 1921360 0.5 NA 0.5 NA 3.4 5/31/2009
5-35 1921480 0 NA 0 NA .e5in 5/31/2009
5-36 1921160 0.75 NA 0.75 NA 425 5l27/2009
S37 1920990 125 NA 125 NA 11.9 5/27/2009
5-38 1921270 025 NA 025 NA 102 5/27/2009
S-47 1960240 1.5 NA 1.5 NA 11.1 5/30/2009
S-42 1960540 0 NA 0 NA 0.9 5/30/2009
5-43 1970530 0.5 NA 0.5 NA 1.7 5/28/2009
S-44 1970070 025 NA 025 NA i.7 5/28I2009
S-t00 2000780 2 NA 2 NA 21.3. 5/29/2009
S-707 2007150 125 NA 125 NA 11.9 5/29/2009
~ 5-102L1 2037560 125 NA 1.25 NA 77.7 5/31/2009
S-103 2001680 1.5 NA 1.5 NA 11.9 5/18/2009
5-104 2001960 1.75 NA 1.75 NA 15.3 5/20/2009
5-105 2001520 4 NA 4 NA 32.7 SI20/2009
5-106 2010120 1625 NA 1625 NA 174.3 6/2/2009
S-io7 2011130 2.25 NA 225 NA 2e.9 5/18/2009
5-708 2011000 3.5 NA 3.5 NA 40 5/30/2009
S-109 2022450 2 NA 2 NA 21.3 5/30/2009
S-110 2011290 11.75 NA 11.75 NA 98.6 5/30/2009
S-1 t 1 2050510 2 NA 2 NA 19.6 5/30/2009
5-112 2021350 0 NA 0 NA 0.5 5/30/2009
5-113 2021430 1.75 NA 175 NA 22.1 5/18/2009
5-114A 2021980 125 NA 125 NA 102 5/30/2009
S-i~5 2022300 2.5 NA 2.5 NA 27.2 5/29/2009
S-116 2031810 1.5 NA 1.5 NA 13.6 5/28/2009
5-117 2030120 1.5 NA 1.5 NA 15.3 5/29/2009
5-118 2032000 5 NA 5 NA 76.5 5/28I2009
5-119 2041620 1 NA 1 NA 52 5/30/2009
5-120 2031980 5.5 NA 5.5 NA 67.2 5/29/2009
S-121 2060410 4.5 NA 4.5 NA 53.8 5/28/'2009
S-122 2050810 3 NA 3 NA 21.3 5/29l2009
S-123 2041370 1.5 NA 1.5 NA 20.4 S/26I2009
S-12a 2061360 1.75 NA 1.75 NA 17.9 5/26I2009
5-125 2070830 2.25 NA 225 NA 20.4 5/28/2009
5-726 20710970 125 NA 125 NA 15.3 6/1/2009
S-200 1972390 125 NA 125 NA 14.5 5/28/2009
S-207 2001840 0 NA 0 NA 0.85 6/19/2009
S-213A 2042130 2 NA 2 NA 13.6 5/29/2009
S-215 2021540 2 NA 2 NA 18.7 6/1/2009
5-276 2001970 4.75 NA 4.75 NA 51 5/29/2009
5-217 2070950 025 NA 025 NA 1.7 6/1/2009
S-400 2070740 2 NA 2 NA 9.4 5/28I2009
S-401 2060780 16 NA 16 NA 99.5 &2/2009
5-504 0 NA 0 NA 0.85 5/28/2009
~
`~~ - ,
MICROFILMED
03/01/2008
DO NOT PLACE
ANY NEW MATERIAL
UNDER THIS PAGE
°'
F:\LaserFichelCvrPgs_InsertslMicrofilm Marker.doc
e e
WELL LOG TRANSMITTAL ~ ÓÔ- /1;) Co
To: State of Alaska
Alaska Oil and Gas Conservation Comm.
Attn.: Librarian
333 West ih Ave., Suite 100
Anchorage, Alaska 99501
February 17, 2006
J 3tcL 1
RE: MWD Formation Evaluation Logs S-102 L1 + L1 PB1,
The technical data listed below is being submitted herewith. Please address any problems or
concerns to the attention of:
Rob Kalish, Sperry Drilling Services, 6900 Arctic Blvd., Anchorage, AK 99518 907-273-3500
S-102 Ll + Ll PBl:
LAS Data & Digital Log Images:
50-029-22972-60, 71
1 CD Rom
~
~l 09-IDlP
5~~
DATA SUBMITTAL COMPLIANCE REPORT
12/5/2005
Permit to Drill 2031560
Well Name/No. PRUDHOE BAY UN AURO S-102L 1
Operator BP EXPLORATION (ALASKA) INC
API N~f5~~9j2~2-1o~ ~J
MD
14980/' TVD 6852 /' Completion Date 11/5/2003 ~ Completion Status
~--,--
REQUIRED INFORMATION
Mud Log No
Samples No
DATA INFORMATION
Types Electric or Other Logs Run: SGRC, GR, EWR, Memory Quad Combo
Well Log Information:
Logl Electr
Data Digital Dataset
Type Med/Frmt Number Name
!6 C Lis 13345 Induction/Resistivity
£ C Lis
~ C Lis
~
~ C Lis
J.eg""
jB- C TIP'~
~
Eÿ C Las
26
~ C
C Las
Las
Rpt
, Rpt
Rpt
Rpt
~
D (,.1)
D "-/5
Lug
~-_.""-
Log Log Run
Scale Media No
13345 Induction/Resistivity
12287 Induction/Resistivity
Induction/Resistivity
M Ie) 1..0, w. ì1J l> kO, Blu
12287 Neutron
Neutron
IV¡ tJ t.,4~ ~L rVO 1...0 ~
Blu
12287 Sonic
Sonic M è I...Q-, ~
12287 Induction/Resistivity
'tv b l..,o ~
Blu
12287 Neutron
12287 Sonic
Directional Survey
Directional Survey
Directional Survey
Directional Survey
12398 Induction/Resistivity
12398 Rate of Penetration
rno udiu.r.}n~3i&tivity
1-01L
Current Status 1-01L
UIC N
D;"''';F-:e, ) ~
(data taken from Logs Portion of Master Well Data Maint
.
Interval OH I
Start Stop CH Received Comments
11627 14944 Open 10/26/2005 GR FET Res ROP plus
Graphics
11627 14396 Open 10/26/2005 PB 1 GR FET Res ROP
plus graphics
6674 6754 Open 12/2/2003 CML Array Induction,
Shallow Focussed
6674 6754 Open 12/2/2003 CML Array Induction,
Shallow Focussed
CML Photo Density Dual
Spaced Neutron
CML Photo Density Dual
Spaced Neutron
CML Compensated Sonic
CML Compensated Sonic
CML Array Induction,
Shallow Focussed
11500 14334 Open 12/2/2003 CML Photo Density Dual
Spaced Neutron
6674 6754 Open 12/2/2003 CML Compensated Sonic
11500
11500
6674
6674
6674
1-7
1-7
1-7
14231
14231
12777
12777
11627
11627
11627
14334 Open 12/2/2003
14334 Case 12/2/2003
6754 Open 12/2/2003
6754 Open 12/2/2003
6754 Open 12/2/2003
.
14980
14980
14434
14434
12/8/2003
12/8/2003
12/8/2003
12/8/2003
MWD
PB1
MWD - PB1
GR, EWR4, ROP
GR, EWR4, ROP
GR, EWR4, ROP
14932 Open 2/12/2004
14932 Open 2/12/2004
14932 Open 2/12/2004
DATA SUBMITTAL COMPLIANCE REPORT
12/5/2005
Permit to Drill 2031560
Well Name/No. PRUDHOE BAY UN AURO S-102L 1
Operator BP EXPLORATION (ALASKA) INC
API No. 50-029-22972-60-00
MD 14980 TVD 6852 Completion Date 11/5/2003 Completion Status 1-01L Current Status 1-01L UIC N
_' LO!:l ~----
Rutc of f"'enetratior, 1-7 11627 14932 Open 2/12/2004 GR, EWR4, ROP
ED 0 Mtl./J 12399 I nd uction/Resistivity 1-5 11627 14384 Open 2/12/2004 GR, EWR4, ROP - PB1
ED 0 ~(; 12399 Rate of Penetration 1-5 11627 14384 2/12/2004 GR, EWR4, ROP - PB1
1Q9 ~tinn/Re5i~L;vlrr 1-5 11627 14384 2/12/2004 GR, EWR4, ROP - PB1
~ ß;ot<i of f\cnetrat¡"n 1-5 11627 14384 2/12/2004 GR, EWR4, ROP - PB1
Production 5 Blu 1 11626 14573 Case 5/3/2004 MEMORY PRODUCTION
PROFILE, .
SPINITEMPPRES/CALlDE
FT
Well Cores/Samples Information:
Name
Interval
Start Stop
Sent
Received
Sample
Set
Number Comments
ADDITIONAL INFORMATION
Well Cored? Y I~
Daily History Received?
~N
6)N
Chips Received? - Y I fJ
.J
Formation Tops
Analysis
Received?
~
,-~,-_.-
Comments:
.
Compliance Reviewed By:
~
._~~
Date:
Jr- þ~dj)-()\-
.
.
ary 0 f.'
'" "tï
WELL LOG TRANSMITTAL
To: State of Alaska
Alaska Oil and Gas Conservation Comm.
Attn.: Howard Okland
333 West 7th Avenue, Suite 100
Anchorage, Alaska
February 12,2004
RE: MWD Formation Evaluation Logs S-102 L1 & S-102 L1 PB1, AK-MW-2737220
S-102 L1 & S-102 L1 PB1:
Digital Log Images:
API#: 50-029-22972-60, 71
:1/---1 '> "1 -..jJ..-
1 CD Rom
PLEASE ACKNOWLEDGE RECEIPT BY SIGNING AND RETURNING A COPY OF THE TRANSMITTAL
LETTER TO THE ATTENTION OF:
Sperry Drilling Services
Attn: Rob Kalish
6900 Arctic Blvd.
Anchorage, Alaska 99518
BP Exploration (Alaska) Inc.
Petro- Technical Data Center LR2-1
900 E. Benson Blvd.
Anchorage, Alaska 99508
Date: lfJ.v'~r
w
Signed:
;L 03" ¡Ç-<,
h( I t-
.
â03 - '5 (0
.
WELL LOG TRANSMITTAL
To: State of Alaska
Alaska Oil and Gas Conservation Comm.
Attn.: Howard Okland
333 West 7th Avenue, Suite 100
Anchorage, Alaska
January 26, 2004
RE: MWD Formation Evaluation Logs 804.02 Ll PBl,
AK-MW-2737220
1 LDWG fonnatted Disc with verification listing. # /tJ3 9Dr
~I#: 50-029-22972-70 I
PLEASE ACKNOWLEDGE RECEIPT BY SIGNING AND RETURNING A COPY OF THE TRANSMITI'AL
LETI'ER TO THE ATI'ENTlON OF:
Sperry-Sun Drilling Services
Attn: Rob Kalish
6900 Arctic Blvd.
Anchorage, Alaska 99518
BP Exploration (Alaska) Inc.
Petro- Technical Data Center LR2-1
900 E. Benson Blvd.
Anchorage, Alaska 99508
Date:
Sign~\~( ~~~~,,(~~
RECEIVED
F"r:: 1~' ¡nt),1
,.,,) ~. ~_·",v'4
Alaska Oi! & Gas Cons. Commision
.\ r::"'h....t:lne
Ff>:IM1-E~~;;:
~~~'v\~
.
. 803-15~
WELL LOG TRANSMITfAL
To: State of Alaska
Alaska Oil and Gas Conservation Comm.
Attn.: Howard Okland
333 West 7th Avenue, Suite 100
Anchorage, Alaska
January 26, 2004
RE: MWD Formation Evaluation Logs S-102 Lt,
AK-MW-2737220
1 LDWG fonnatted Disc with verification listing. -# /d 3 cr 8"
API#: 50-029-22972-60
PLEASE ACKNOWLEDGE RECEIPT BY SIGNING AND RETURNING A COpy OF THE TRANSMITTAL
LETTER TO THE ATTENTION OF:
Sperry-Sun Drilling Services
Attn: Rob Kalish
6900 Arctic Blvd.
Anchorage, Alaska 99518
BP Exploration (Alaska) Inc.
Petro-Technical Data Center LR2-1
900 E. Benson Blvd.
Anchorage, Alaska 99508
Date:
Sign~1\~~ ~\-S~,~
RECEIVED
f·;--''''· A[/" 0!'\U~ ,1
,'",,;J ~. I...V .£.~
,AJ.~,ka Œ! & Gas Cons, commm.;oo
.~.r·l"·i;¡M~
r"h'¡.'IJ!"''''''
. STATE OF ALASKA ...
ALASKA AND GAS CONSERVATION COM~ION
WELL COMPLETION OR RECOMPLETION REPORT AND LOG
1a. Well Status: 181 Oil 0 Gas 0 Plugged 0 Abandoned 0 Suspended 0 WAG
20AAC 25.105 20AAC 25.110
o GINJ 0 WINJ 0 WDSPL No. of Completions
2. Operator Name:
BP Exploration (Alaska) Inc.
3. Address:
P.O. Box 196612, Anchorage, Alaska 99519-6612
4a. Location of Well (Governmental Section):
Surface:
4452' NSL, 4499' WEL, SEC. 35, T12N, R12E, UM
Top of Productive Horizon:
653' NSL, 4448' WEL, SEC. 22, T12N, R12E, UM
Total Depth:
3386' NSL, 4943' WEL, SEC. 22, T12N, R12E, UM
4b. Location of Well (State Base Plane Coordinates):
Surface: x- 618930 y- 5980655 Zone- ASP4
TPI: x- 613583 y- 5987337 Zone- ASP4
Total Depth: x- 613044 y- 5990059 Zone- ASP4
18. Directional Survey 181 Yes 0 No
21. Logs Run:
SGRC, GR, EWR, Memory Quad Combo
22.
One Other
5. Date Comp., Susp., or Aband.
11/5/2003
6. Date Spudded
10/26/2003
7. Date T.o. Reached
11/2/2003
8. Elevation in feet (indicate KB, DF, etc.)
KBE = 64.2
9. Plug Back Depth (MD+ TVD)
14980 + 6852 Ft
10. Total Depth (MD+TVD)
14980 + 6852 Ft
11. Depth where SSSV set
(Nipple) 2515' MD
19. Water depth, if offshore
N/A MSL
CASING, LINER AND CEMENTING RECORD
1 b. Well Class:
181 Development 0 Exploratory
o Stratigraphic 0 Service
12. Permit Number
203-156
13. API Number
50- 029-22972-60-00
14. Well Number
PBU S-102L 1
15. Field and Pool
Prudhoe Bay Field / Aurora Pool
16. Lease Designation and Serial No.
ADL 028256
17. Land Use Permit:
20. Thickness of Permafrost
1900' (Approx.)
20" 91.5# H-40 29' 109'
10-3/4" 45.5# K-55 27' 4816'
7" 29# L-80 26' 11719'
4-112" 12.6# L-80 11543' 12827'
3-3/16" x 2-7/8" 6.2#/6.16# L-80 12737' 14968'
23. Perforations open to Production (MD + TVD of To,.e and
Bottom Interval, Size and Number; if none, state none"):
2-7/8" Slotted Section
MD TVD MD TVD
13284' - 14384' 6809' - 6828'
14475' - 14935' 6845' - 6853'
30"
13-112"
9-7/8"
6-118"
3-3/4"
260 sx Arctic Set (Approx.)
643 sxA$ Lite 3,510 'G'. Top Job: 150 sxAS Lite
627 sx Class 'G'
57 sx Class 'G' (Solid & Slotted Liner)
Uncemented Slotted Liner
SIZE
4-112", 12.6#, L-80
TUBING RECORD
DEPTH SET (MD)
11559'
PACKER SET (MD)
11524'
ACID, FRACTURE, CEMENT
CONTINUED ON REVERSE SIDE
/
~\/
DEPTH INTERVAL (MD)
12827'
AMOUNT & KIND OF MATERIAL USED
Set Whipstock
26. PRODUCTION TEST
Date First Production: Method of Operation (Flowing, Gas Lift, etc.):
November 21, 2003 Gas Lift
Date of Test Hours Tested PRODUCTION FOR Oll-BBl GAs-McF WATER-BBl CHOKE SIZE I GAS-Oil RATIO
11/25/2003 12 TEST PERIOD'" 2,270 2,140 5,160 1000 943
Flow Tubing Casing Pressure CALCULATED ........ Oll-BBl GAs-McF WATER-BBl Oil GRAVITY-API (CORR)
Press. 291 24-HoUR RATE""" 4,540 4,280 10,320 33.6
27. Brief description of lithology, porosity, fractures, apparent~~;: ~^;~resence of oil, gas or water (a~~~~jfef;J:lcessary).
SUbmi~~~;~ChiPS; if none, state "none". OEC ~ 1j)Q3 DEC - 4 2003
None ¡ '...... t8II8BfL
.:~;¿3i On\G\NAL
~~~~:=:i ;\
Form 10-407 Revised 2/2003
Alaska Oil & Gas Cons. Commission
Anchorage
28.
GEOLOGIC MARKERS.
29.
~
'°'0 ..JRMATION TESTS
NAME
MD
TVD
Include and briefly summarize test results. List intervals tested,
and attach detailed supporting data as necessary. If no tests
were conducted, state "None".
This lateral was drilled entirely
within the Kuparuk C interval.
None
Kuparuk C2E
11654'
6744'
RECEš\/ED
DEC - 4 2003
Alaska Oil & Gas Cons. Commission
Anchorage
30. List of Attachments: Summary of Pre-Rig Work and Daily Drilling Reports, Surveys
31. I hereby certify that the foregoing is true and correct to the best of my knowledge.
Signed .{I\I\. it \....1 o.~/J.... T·tl T h· I As . t t D t
Terrie Hubble -1(J) u ~.J ~ I e ec mca SIS an a e
PBU 5-1 02L 1 203-156 Prepared By Name/Number: Terrie Hubble, 564-4628
Well Number Drilling Engineer: Mark Johnson, 564-5666
JÄ/03/Q~
Permit No. I Approval No.
INSTRUCTIONS
GENERAL: This form is designed for submitting a complete and correct well completion report and log on all types of lands and leases in
Alaska.
ITEM 1a: Classification of Service Wells: Gas Injection, Water Injection, Water-Alternating-Gas Injection, Salt Water Disposal, Water
Supply for Injection, Observation, or Other. Multiple completion is defined as a well producing from more than one pool with
production from each pool completely segregated. Each segregated pool is a completion.
ITEM 4b: TPI (Top of Producing Interval).
ITEM 8: The Kelly Bushing elevation in feet above mean low low water. Use same as reference for depth measurements given in other
spaces on this form and in any attachments.
ITEM 13: The API number reported to AOGCC must be 14 digits (ex: 50-029-20123-00-00).
ITEM 20: True vertical thickness.
ITEM 22: Attached supplemental records for this well should show the details of any multiple stage cementing and the location of the
cementing tool.
ITEM 23: If this well is completed for separate production from more than one interval (multiple completion), so state in item 1, and in
item 23 show the producing intervals for only the interval reported in item 26. (Submit a separate form for each additional
interval to be separately produced, showing the data pertinent to such interval).
ITEM 26: Method of Operation: Flowing, Gas Lift, Rod Pump, Hydraulic Pump, Submersible, Water Injection, Gas Injection, Shut-In, or
Other (explain).
ITEM 27: If no cores taken, indicate "None".
ITEM 29: List all test information. If none, state "None".
Form 10-407 Revised 2/2003
.
.
Well:
Field:
API:
Permit:
Date
S-1 02L 1
Prudhoe BayUnit
50-029-22972-60
203-156
Accept:
Spud:
Release:
Rig:
1 0/23/03
1 0/26/03
11/05/03
Nordic #1
PRE-RIG WORK
09/15/03
BRUSH & FLUSH TUBING FROM 50' TO 5420' SLM.
09/16/03
SET 4-1/2" X - CS @ 11478' SLM PULLED S/O GLV FROM STA.# 1 (BTM SET OF PKG. & LATCH MISSING n
FLOW CUT) CURRENTLY PULLING LGLV FROM STA. # 3.
09/17/03
PULLED INT LGLV 16/64" PORTS 1851# TRO STA 3 PULLED INT LGLV 16/64" PORTS 1950# TRO STA 4 SET
INT DGLV STA 4 SET INT DGLV STA 3 RETRIEVED MISSING INT LATCH FROM STA 1 LOST LOWER 41/2
OK-1 ARM & POCKET BRUSH IN STA 1.
09/18/03
1/2" X 18" POCKET BRUSH & 3.11" X 1.25 KOT LOWER ARM SET INT DGLV W/ EXT PKG @ STA 1 MIT-IA TO
3000# PASSED PULLED 41/2 X- CS - CS EMPTY Dff W/ 3.80 CENT 4.5" BL BRUSH SB, STOP DUE TO DEV
@ 11742' SLM + 10' =11752" CORR TO ELM POOH, SB EMPTY.
09/20/03
TUBING HANGER TESTED TO 5000 PSI. PASS. PACKOFF TESTED TO 3000 PSI. PASS. ALL LDS WORKING
GOOD.
10/03/03
PLACED A 74 BBL, 12K# CAC03 SLURRY ACROSS PERFS AND SLOTTED LINER TO SECURE WELL FOR
CTD 51. DEVELOPED 50-550 PSI BUMP AT LlNER/OPENHOLE FILLUP 1 BPM, SQZ'D 34 BBP THOUGH
PERFS AND SLOTTED LINER INTO 6" OPEN HOLE TO 680 PSI. FINAL LINER LEAKOFF RATE OF 45
PSI/MINUTE WITH 2 BBLS (130') OF SLURRY LEFT ABOVE TOP PERF. SECURE WELL FOR NIGHT. DIESEL
IN TUBING, SURFACE TO 6800'.
10/04/03
T/I/OmO/400/200 PRESSURE UP ON CALCIUM CORBONATE IN SLOTTED LINER W/ DIESELmpUMPED 10.5
BBLS DIESELmTBG PRESSURED UP TO 280 PSI THEN BLED BACK TO 0 PSln-FINAL WHP'S=0/400/20 .
10/07/03
RIH WI 2-1/8" JSN. TAG TOP OF CAC03 PLUG @ 11705' CTM. JET DOWN TO 11850 IN 3 BITES. ATTEMPT
TO FLUFF UP & PUSH INTO PERFS. APPEARS TO HAVE SLOWED IT DOWN SOME. BROKE THRU BRIDGE
@ - 11850' CTM. TAG TD @ 13068' CTM. PUMP FLOPRO SWEEP & CHASE OOH @ 80% W/ - 80 - 85 %
RETURNS. RIH WI WEATHERFORD 2-7/8" MHA / 2-7/8" MOTOR / 3.80" STRING REAMER I 3.80" MILL.
TAGGINGISTALLlNG THROUGH PERFS FROM 11569'-11743'. TRY TO WORK CAC031NTO PERFS. PUMP
FLOPRO SWEEPS AND BACKREAM THROUGH PERFS.
10/08/03
MILLING DOWN TO CEMENT RETAINER WI 3.8" DSM WI STRING REAMERS. NO MOTOR WORK/STALLS
OBSERVED BELOW 12250'. MILL TO 13050'. BACKREAM TO 11400'. REPEAT TO 13050' AND REPEAT
BACKREAM TO 11400'. DO RETURN TEST TO 40 BBL OT FOR 15 BBLS, 86% AVERAGE RETURNS. DRIFT
DRY TO 13050'. POOH. PUMP 87 BBLS CAC03. ESTIMATE 28 BBLS BEHIND PIPE. LAY IN REMAINDER TO-
7700'. ESTABLISH INJECTIVITY AY 0.3 BPM W/730 PSI WHP. HESITATE SQUEEZE REMAINING SLURRY
ABOVE PERFS.
5-1 02L 1, Coil Tubing Drilling .
Page 2
.
10/09/03
CONTINUE TO SQUEEZE REMAINING CAC03 SLURRY. SQUEEZED A TOTAL OF 62 BBLS OF SLURRY
BEHIND PIPE. DROPPED BALL AND CLEANED OUT FROM 7400' TO TD WHILE JETTING WI 1% XS KCL AND
FLO PRO SWEEPS. CIRCULATED BOTTOMS UP, AVERAGE RETURN RATE DURING CIRCULATION WAS
92%. LAY IN 30 BBLS OF FLO PRO FROM 13,050' TO 11,100' AND CONTINUE JETTING WHILE PUH AT 80%.
JET ALL MANDRELS, WHILE POOH. RIH WI 3-1/8" JARS I 3.70" X 15' DMY WHIPSTOCK DRIFT (OAL::: 26.2')
SET DOWN @ 11647' CTM. UNABLE TO WORK PAST. POOH. RIH WI 2.5" JSN & JET DOWN FROM 11400'
CTM PUMPING FLOPRO SWEEPS. JET DOWN TO 13051' AND PUMP FINAL 10 BBL FLO PRO SWEEP AND
POOH AT 80% WHILE JETTING MANDRELS AND JEWLERY. RIH WI 3-1/8" JARS 13.70" X 15' DMY
WHIPSTOCK DRIFT (OAL::: 26.2').
10/1 0/03
CONTINUE RIH WI WHIPSTOCK DUMMY DRIFT. TAGGED AT 11,330' AND AGAIN AT 11,716' CTMD BUT
WORKED THROUGH WIO PROBLEM. PUH TO 11,200' CTMD, ENCOUNTERED 3K OVER PULL AT -11,640'.
RBIH TO 13050' CTMD WIO PROBLEMS. LAY IN 28 BBLS OF FLO PRO TO 11,350'. HAD 95% RETURNS
DURING FLOW CHECK TO 40 BBL GAUGE TANK AT 1.5 BPM. POOH AND FREEZE PROTECTED TUBING
WICRUDE FROM 2500' TO SURFACE. FREEZE PROTECTED FLOWLINE W/5 BBLS 60/40 METHANOL
WATER. TAGGED WELL WIFREEZE PROTECT DATA.
.
.
BP EXPLORATION
Operations Summary Report
Page 1 of 14
Legal Well Name:
Common Well Name:
Event Name:
Contractor Name:
Rig Name:
S-102
S-102
REENTER+COMPLETE
NORDIC CALISTA
NORDIC 1
Start:
Rig Release:
Rig Number:
9/27/2003
11/5/2003
N1
Spud Date: 9/14/2000
End:
Date From - To Hours Task Code NPT Phase Description of Operations
.... - ....---.---- --.----....
10/21/2003 10:00 - 18:00 8.00 MOB N RREP PRE Rig released from DS 7-14B @ 10:00Hrs on 10/21/2003.
Continue to prep to move off well. Problems with Nordic 1 drive
system. Transmission will not engage. Can't move off well.
Changeout hydraulic splitter for rig drive system.
18:00 - 20:00 2.00 MOB N RREP PRE Continue installation of hydraulic splitter for rig drive system.
20:00 - 20:15 0.25 MOB P PRE PJSM. Review procedure, hazards & mitigation for moving rig
off well.
20: 15 - 20:50 0.58 MOB P PRE Prep to move rig off well. RID hardline & outside tanks for
moving to S-pad.
20:50 - 22:05 1.25 MOB P PRE Move rig 3' off well. N/U tree cap on 07 -14B & PfT - OK.
Secure Pad.
22:05 - 23:00 0.92 MOB P PRE Move rig past Nordic-2 & set down @ pad entrance.
23:00 - 00:00 1.00 MOB P PRE Prep to UD windwalls & derrick. Meanwhile confirm camp max
height (TV-dish) to be 20.5'.
0.00 P COMP
1 0/22/2003 00:00 - 03:30 3.50 MOB P PRE PJSM. RlU tilt cylinders. UD windwalls. Scope down & UD
derrick. Meanwhile conduct post-operations pad inspection on
07-14B.
03:30 - 07:30 4.00 MOB P PRE String-in man-rider winch line & cleanout cellar dykes.
Meanwhile CPS confirm rig max height (lowered windwall) to
be 51.5' (+ any additional raise +/-30" - to be confirmed after
jacking up rig).
07:30 - 08:00 0.50 MOB P PRE Held pre-move safety meeting with Security, tool service, CPS
& all personnel.
08:00 - 20:30 12.50 MOB P PRE Move rig from DS# 07 to S-102. Observe snow drift & uneven
surface in front of well. Contact Tool service to level pad while
we're W.O.Wind.
20:30 - 00:00 3.50 MOB N WAIT PRE W.O. wind to raise windwalls. Wind @ 21mph steady.
Meanwhile pushoff snow drift in front of S-102.
1 0/23/2003 00:00 - 02:30 2.50 MOB N WAIT PRE Continue W.O. wind to raise windwalls. Wind @ 15mph steady
with 23m ph gusts. Meanwhile Tool Service haul gravel from
Oxbow pit & fill/level S-102 frontage.
02:30 - 02:45 0.25 MOB P PRE Spot rig in front of S-102. Wind calm down to 8mph steady with
18mph gusts.
02:45 - 06:00 3.25 MOB P PRE Raise & scope up derrick. Secure guy wires & retract tilt rams.
Raise windwalls.
06:00 - 08:00 2.00 MOB P PRE M/U guy wires to wind walls. Install cellar berms. Pull tree
hand rails.
08:00 - 08:15 0.25 MOB P PRE SAFETY MEETING. Review procedure, hazards and
mitigation for backing rig over well.
08: 15 - 09:00 0.75 MOB P PRE Back rig over well with no problems.
ACCEPT RIG ON WELL S-102 L 1 AT 0900 HRS, 10/23/2003.
09:00 - 11 :00 2.00 RIGU P PRE RlU hard line, position tanks and trailers.
11 :00 - 13:00 2.00 BOPSUR.P PRE N/U BOPE.
13:00 - 15:00 2.00 MOB P PRE Pick up injector head from pipe bay and stab pipe.
15:00 - 21 :00 6.00 BOPSUR.P PRE Pressure and function test BOPE. Test witness waived by
AOGCC inspecter L. Grimaldi. Changeout leaking blind rams
and retest OK. Meanwhile fill rig pits with 1 % KCL water.
21 :00 - 21 :30 0.50 RIGU P PRE Inspect injector head - OK.
21:30 - 22:15 0.75 RIGU P PRE Open up well & observe Opsi WHP - well on vac. lAP = 35psi,
OAP = Opsi. FL is disconnected. Observe well for 30mins -
stable.
22: 15 - 22:30 0.25 EVAL P WEXIT Held pre-operations safety meeting with WF & rig crew. Review
Printed: 11/12/2003 11:02:05AM
r
'----
.
Page 2 of 14
BP EXPLORATION
Operations Summary Report
Legal Well Name:
Common Well Name:
Event Name:
Contractor Name:
Rig Name:
Date
----..
10/23/2003
10/24/2003
S-1 02
S-102
REENTER+COMPLETE
NORDIC CALISTA
NORDIC 1
, NPT ¡
,
i From - To Hours Task Code Phase
i I
1..------..
22:15 - 22:30 0.25 EVAL P WEXIT
22:30 - 22:45 0.25 EVAL P WEXIT
22:45 - 00:00 1.25 EVAL P WEXIT
00:00 - 00:30 0.50 EVAL P WEXIT
00:30 - 08: 15 7.75 EVAL N SFAL WEXIT
08: 15 - 08:45 0.50 EVAL P WEXIT
08:45 - 10:45 2.00 EVAL P WEXIT
10:45 - 11 :00 0.25 EVAL P WEXIT
11 :00 - 13:30 2.50 EVAL P WEXIT
13:30 - 13:45 0.25 EVAL P WEXIT
13:45 - 14:30 0.75 EVAL P WEXIT
14:30 - 15:10 0.67 EVAL P WEXIT
15:10 - 17:45 2.58 EVAL P WEXIT
17:45 - 18:45 1.00 EVAL P WEXIT
18:45 - 19:45 1.00 EVAL P WEXIT
19:45 - 21 :20 1.58 EVAL P WEXIT
21 :20 - 21 :50 0.50 EVAL P WEXIT
21 :50 - 22:05 0.25 WHIP P WEXIT
22:05 - 22:45 0.67 WHIP P WEXIT
22:45 - 00:00 1.25 WHIP P WEXIT
10/25/2003 00:00 - 01 :00 1.00 WHIP P WEXIT
01 :00 - 01 :20 0.33 WHIP P WEXIT
01 :20 - 02:10 0.83 WHIP P WEXIT
Start: 9/27/2003
Rig Release: 11/5/2003
Rig Number: N1
Spud Date: 9/14/2000
End:
Description of Operations
well plan, potential hazards & LSX whipstock drift BHA M/U
procedures.
P/U injector. Cut coil & install WF CTC. Pull test to 35k - OK.
Fill CT will KCL water. Fix CTC leak. Circulate out N2 in CT.
Press test inner reel valve & CTC to 3500psi - OK.
M/U WF LSX whipstock drift BHA # 1. Tag up @ SSV. Suspect
SSV (new model with electric motor actuator) is not fully open.
Call out Pad Operator.
Pad Operator troubleshoot SSV - no luck. Electrical power
connection to SSV was diconnected with S-Riser. Pad
Operator call out Field Electrician's to provide 24 VDC power
system to operate SSV. Plastic plug inside fusable was 1" to
short to contact valve stem. Got another fusable cap and it
was the same design. Cut 2" OD by 1.5" long plastic drift plug
and used as fusable cap inside spacer. Cap made up tight to
SSV valve stem. OK.
M/U BHA #1. Weatherford 3.70" drift whipstock BHA. Total
length = 26.16 ft.
RIH with 3.70" drift BHA,
Slow to 45 fpm in horizontal section 'of 4-1/2" liner at 12000'.
RIH with 12.5K down wt and 0.35 bpm. RIH clean to 13,000 ft.
Up Wt = 37.5K, Dwn Wt = 11 Kat 13000 ft.
POH with 3.70" Drift BHA.
Layout WF drift BHA.
Prep SWS Memory GR / CCL logging tool.
M/U BHA #2 with SWS Memory GR / CCI inside carrier. M/U
WF MHA. BHA = 18.74 FT.
RIH with BHA #2. Sat down wt at 2762 ft. Pick up and RIH
OK. Nothing in tubing at this depth? Continue RIH at 90 fpm.
Stop at 11,000 ft. Log down with SWS MGR / CCL at 60 fpm.
0.25 bpm at 100 psi. Log down to 13,000 ft.
Log up with SWS MGRlCCL @ 60fpm from 13000' to 11000'.
Paint EOP Flags @ 12700' & 11000'.
POOH with SWS MGRlCCL logging tool.
UD SWS MGRlCCL tools. Download data, print log & tie into
12/11/00 PDS Jewelry log. Made -50' correction to match
ELMD - EOP flag ELMD = 10950' & 12650' respectively.
Held PJSM with Weatherford, Sperry & SWS personnels on
whipstock setting job.
P/U TIWlWeatherford 4-1/2" LSX whipstock & set on catwalk.
Insert 2 RA pip tags in whipstock - distance from TOWS to RA
tag = 8.8'. M/U setting tool & scribe Sperry ESS to W/S tray.
M/U double swivel, MHA & injector.
RIH with whipstock setting BHA # 3 (OAL - 53.3').
Continue RIH whipstock setting BHA # 3 to 1st flag seen @
11049.4'. Correct CTD to ELMD of 11003.3'. Continue RIH &
see 2nd flag right on depth @ 12703.3'. RIH to 13000'.
PUH @ 35k to 12800'. RBIH to 13000' & PUH to 12838' 3x to
swivel W/S tray orientation to LS. PUH to 12838.1' & position
TOWS @ 12825'.
Load 5/8" steel ball. Chase ball to seat @ 2.2bpm/990psi. Slow
to 0.75bpm @ 45bbls. Ball on seat after 54.2bbls away. Ramp
up to 4600psi to actuate setting tool. See 10k wt drop with no
Printed: 11/12/2003 11 :02:05 AM
.
.
BP EXPLORATION
Operations Summary Report
Legal Well Name:
Common Well Name:
Event Name:
Contractor Name:
Rig Name:
S-102
S-102
REENTER+COMPLETE
NORDIC CALISTA
NORDIC 1
Date
,
I From - To Hours Task Code NPT
L-.. __ ~_
01:20 - 02:10 0.83 WHIP P
10/25/2003
02: 1 0 - 04:00 1.83 WHIP P
04:00 - 04:30 0.50 WHIP P
04:30 - 05:10 0.67 STWHIP P
05:10 - 07:30 2.33 STWHIP P
07:30 - 08:40 1.17 STWHIP P
08:40 - 10:00 1.33 STWHIP P
10:00 - 11:40 1.67 STWHIP P
11 :40 - 12:40 1.00 STWHIP P
12:40 - 14:00 1.33 STWHIP P
14:00 - 14:40 0.67 STWHIP P
14:40 - 15:00 0.33 STWHIP P
15:00 - 15:45 0.75 STWHIP P
Page 3 of 14
Start:
Rig Release:
Rig Number:
Phase
9/27/2003
11/5/2003
N1
Spud Date: 9/14/2000
End:
WEXIT
WEXIT
WEXIT
WEXIT
WEXIT
WEXIT
WEXIT
WEXIT
WEXIT
WEXIT
WEXIT
WEXIT
WEXIT
15:45 - 16:45 1.00 STWHIP P WEXIT
16:45 -17:30 0.75 STWHIP P WEXIT
17:30 - 18:20 0.83 STWHIP P WEXIT
18:20 - 20:10
1.83 STWHIP P
20:10 - 21:00
0.83 STWHIP P
21:00 - 21:15
21:15 - 21:30
21 :30 - 23:00
23:00 - 23:15
0.25 STWHIP P
0.25 STWHIP P
1.50 RIGD P
0.25 RIGD P
WEXIT
WEXIT
WEXIT
WEXIT
WEXIT
WEXIT
Description of Operations
_n._______..__ ...._ .. ..~. ...._..._.
pressure drop. SID pump & wait 2mins for ESS to record tray
orientation. S/O 3k - holding. PUH @ 33k. W/S set @ LS with
TOWS @ 12825'.4-1/2" collars @ 12810' & 12840'.
POOH with whipstock setting BHA.
OOH. UD whipstock setting tool & ESS tool all OK. Download
ESS memory data and confirm whipstock tray orientation of
170degs ROHS.
PJSM. M/U window milling BHA #4 with a 3.80" HC DSM,
diamond string reamer, WF straight motor, MHA & 2 jts of PH6
tbg. Locktite DSM & DSR. M/U injector.
RIH window milling BHA #4 (OAL - 82.7').
Correct -38 ft CTD to flag at 10,950 ft. RIH.
Tag whipstock at 12,824 ft. CTD.
Circ. well to used FloPro for milling window. 2.9 bpm, 3000 psi.
Full returns at start.
Partion returns with FloPro around. 2.6/1.9 BPM, 3000 psi.
Milling window. 2.55/1.9 bpm, 3000 psi, 2 Stalls getting
started. Flag CT at top of window at 12,825 ft. Milled to 12826
ft. 2.55/2.15 bpm. Returns getting better.
Milling window, 2.55/2.30 bpm, 2900/3000 psi, 1-2K WOB,
Milled to 12827 ft.
Milling window, 2.55/2.40 bpm, 2900/3100 psi, 2K WOB,
Good returns. Milled to 12828 ft.
Milling window, 2.55/2.40 bpm, 2950/3200 psi, 2K WOB,
Milled to 12829 ft.
Milling window, 2.55/2.40 bpm, 2950/3200 psi, 2K WOB,
Milled to 12830 ft.
SAFETY MEETING. Held weekly rig evacuation drill. All
personnel accounted for. Sign in sheet was correct. All people
to muster area within 2 minutes.
Milling window, 2.55 I 2.40 bpm, 2950/3200 psi, 2K WOB,
Milled to 12832 ft.
Exit bottom of window at 12,831 ft. Stall at 12832 ft. Clean
pick up. Ream down clean.
Mill formation, 2.55/2.42 bpm, 3000/3300 psi, 3-4K WOB,
15 FPH ROP. Milled to 12842'.
Ream window up and down 3 times. Clean window. Clean rig
pits while reaming.
Ream window while swapping well to newer Re-built FloPro
system from last well.
Ream up / down 2 more times. Clean window. 2.6/2.5 bpm.
Good returns. Stop pump and RIH thru window clean. Pull up
clean.
POH while chasing old FloPro to surface. 2.6/2.2 bpm, 2900
psi.
PJSM. UD BHA#4 & inspect mills. Diamond speed mill gauge
3.80" go /3.79" no-go & string mill gauge 3.79" go /3.78"
no-go. Wear on window mill face indicates center crossed the
liner wall.
RIU N2 unit & hardline.
PJSM for blowing down reel with N2.
PT lines - OK. Pump water ahead & blow down reel with N2.
PJSM for swapping out CT reel.
Printed: 11/12/2003 11:02:05 AM
.....
.
BP EXPLORATION
Operations Summary Report
Page 4 of 14
Legal Well Name: S-102
Common Well Name: S-102 Spud Date: 9/14/2000
Event Name: REENTER+COMPLETE Start: 9/27/2003 End:
Contractor Name: NORDIC CALISTA Rig Release: 11/5/2003
Rig Name: NORDIC 1 Rig Number: N1
, ,
Date From - To ! Hours Task Code NPT I Phase Description of Operations
.....--- --.-.""-.. .---..--.... .....---......
10/25/2003 23:15 - 00:00 0.75 RIGD P WEXIT Cut off CTC & pull CT clear of injector chains & gooseneck.
10/26/2003 00:00 - 01 :00 1.00 RIGD P PROD1 Pull & spool back CT to reel. Secure & prep reel for shipment.
[- 1 hr day light savings applied].
01:00 - 01:15 0.25 RIGU P PROD1 PJSM with Peak crew on CT reel swap.
01: 15 - 04:30 3.25 RIGU P PROD1 P/U & lower reel to Peak double drop trailer. Replace reel drive
plates. P/U replacement reel into reel house & align drive pins
& bushing.
04:30 - 06:30 2.00 RIGU P PROD1 RIU hardline to inner reel valve. Slip grapple into CT & pull test.
Pull CT over pipe shed with winch & stab into injector.
06:30 - 09:15 2.75 RIGU P PROD1 C/O packoff. M/U CTC. Pull test. M/U inside hardline. Fill Coil
and pump dart. Dart landed at 59.7 bbls. Calc. cap. = 61.1
bbls.
09: 15 - 09:30 0.25 DRILL P PROD1 PRE-SPUD MEETING. Reviewed well plan and hazards with
all personnel. Reviewed procedure, hazards and mitigation for
BHA M/U.
09:30 - 10:45 1.25 DRILL P PROD1 M/U MWD / PWD BHA #5 with 2.0 deg motor and HC bi-center
bit.
10:45 - 13:15 2.50 DRILL P PROD1 RIH with BHA #5. Shallow hole test. RIH.
13:15 - 13:45 0.50 DRILL P PROD1 Orient TF to low side.
13:45 - 14:00 0.25 DRILL P PROD1 RIH and tag TD at 12901' and correct depth to 12,842 ft. [-59
ft].
14:00 - 16:10 2.17 DRILL P PROD1 Drilling drop / turn section, 2.5/2.3 bpm, 3600/3800 psi, 170R
TF, 30-60 fph, Drilled to 12913'.
16:10 - 16:45 0.58 DRILL P PROD1 Orient TF back to low side, TF had rolled up to 130L.
16:45 - 17:20 0.58 DRILL P PROD1 Drilling drop / turn section, 2.5/2.3 bpm, 3600/3800 psi, 170L
TF, 60 fph, Drilled to 12923'.
17:20 - 17:50 0.50 DRILL P PROD1 Orient TF back to low side, TF had rolled up again. Orient
around twice.
17:50 - 19:00 1.17 DRILL P PROD1 Drilling drop I turn section, 2.5/2.3 bpm, 3600/3800 psi, 170R
TF, 25 fph, Drilled to 12939'. PVT = 247bbls.
19:00 - 21 :05 2.08 DRILL P PROD1 PUH to 12860'. Log down GR thru RA PIP tag. PUH above
window to 11600'. Log down GR & tie into PDC log - add l' to
CTD. RBIH & tag btm @ 12946'. Corrected window depths are
as follows: TOWSrrOW = 12827.2', BOW = 12833.2', RA PIP
TAG = 12836'.
21 :05 - 21 :20 0.25 DRILL P PROD1 Orient TF to HS.
21 :20 - 22:45 1.42 DRILL P PROD1 Drill to projected 80degs incl @ 13010' with 10L-5R TF,
2.5/2.2bpm, 3550/3700psi, 60fph ave ROP. Plan to land with
lateral BHA @ +/-13125'.
22:45 - 00:00 1.25 DRILL P PROD1 POOH for lateral BHA. Observe +ve WHP due to plug in
MMout - lower pump rate & cleanout MMout.
10/27/2003 00:00 - 01 :00 1.00 DRILL P PROD1 Continue POOH drilling BHA #5.
01 :00 - 02:30 1.50 DRILL P PROD1 OOH. PJSM. UD Sperry PWD sub. Check motor & bit - OK.
Check orienter -leaking oil & locked up. C/O orienter. C/O
MWD probe to enable Geo download memory data. Reset
motor bend to 1.04 degs. M/U MHA & injector.
02:30 - 04:50 2.33 DRILL P PROD1 RIH with lateral MWD BHA #6 with 1.04 deg motor & re-run
bicenter bit. SHT tools - OK. RIH clean thru window. Tag TD
@ 13033'. Correct CTD to 13010'. PVT = 184bbls. Have lost
60bbls of mud in last 11 hrs. Have 1 truck of new Flo-Pro mud
on standby.
04:50 - 05:00 0.17 DRILL P PROD1 Orient TF to 75R.
05:00 - 05:40 0.67 DRILL P PROD1 Drill to 13040' with 75-90R TF, 2.5/2.2bpm, 3550/3750psi,
Printed: 11/12/2003 11 :02:05 AM
......
.
BP EXPLORATION
Operations Summary Report
Legal Well Name: S-102
Common Well Name: S-102
Event Name: REENTER+COMPLETE
Contractor Name: NORDIC CALISTA
Rig Name: NORDIC 1
I I .
I From - To Hours I Task Code I NPT
-..-----__ m~.__m __1
10/27/2003 05:00 - 05:40
05:40 - 06:00
06:00 - 06:30
06:30 - 08:00
08:00 - 09:00
09:00 - 09: 15
09: 15 - 09:25
09:25 - 10:30
10:30 - 12:30
12:30 - 12:50
12:50 - 13:45
13:45 - 16:00
16:00 -16:15
16:15 - 16:45
16:45 - 19:00
19:00 - 21:30
21 :30 - 00:00
10/28/2003 00:00 - 00:20
00:20 - 00:35
00:35 - 00:40
00:40 - 01 :40
01 :40 - 02:00
02:00 - 02:10
02:10 - 03:30
03:30 - 04:00
04:00 - 04:25
04:25 - 05:05
0.67 DRILL P
0.33 DRILL P
0.50 DRILL P
1.50 DRILL P
1.00 DRILL P
0.25 DRILL P
0.17 DRILL P
1.08 DRILL P
2.00 DRILL P
0_33 DRILL P
0.92 DRILL P
2.25 DRILL P
0.25 DRILL P
0.50 DRILL P
2.25 DRILL P
2.50 DRILL P
2.50 DRILL P
0.33 DRILL P
0.25 DRILL P
0.08 DRILL P
1.00 DRILL P
0.33 DRILL P
0.17 DRILL P
1_33 DRILL P
0.50 DRILL P
0.42 DRILL P
0.67 DRILL P
Page 5 of 14
Start:
Rig Release:
Rig Number:
Phase
9/27/2003
11/5/2003
N1
Spud Date: 9/14/2000
End:
PROD1
PROD1
PROD1
PROD1
PROD1
PROD1
PROD1
PROD1
PROD1
PROD1
PROD1
PROD1
PROD1
PROD1
PROD1
PROD1
PROD1
PROD1
PROD1
PROD1
PROD1
PROD1
PROD1
PROD1
PROD1
PROD1
PROD1
Description of Operations
-.-.--..
....----.-
60fph ave ROP. Downloaded PWD data shows 11.2ppg ave
ECD while drilling & 12.3ppg max when MMout was plugged.
Orient TF to 15L.
Drill to 13056' with 15L TF, 2.5/2.2bpm, 3550/3800psi, 30fph
ave ROP.
Drilling, 2.5/2_3 bpm, 3570/3700 psi, 8R TF, 40 fph, Drilled
to 13,100'.
Drilling, 2.5/2.3 bpm, 3570/3700 psi, 10R TF, 70 fph,
Drilled to 13,145'.
Wiper trip to window. Clean hole. RIH clean.
Orient TF to 90R
Drilling, 2.5/2.3 bpm, 3570/3700 psi, 85R TF, 70 fph,
Drilled to 13,184 ft.
Started stacking wt at 13,183 ft.
Drilling, 2.5/2.3 bpm, 3600/3800 psi, 90R TF, 40 fph,
Drilled to 13,250 ft.
Geo determined that fault was crossed at 13,183 ft. No change
in mud loss.
Orient TF to 100L.
Drilling, 2_6/2.4 bpm, 3600/3800 psi, 110L TF, 40 fph,
Drilled to 13,300'.
Circulate new FloPro while drilling, Free spin press fell from
3600 psi to 3100 psi with new FloPro, also better weight
transfer. Full returns at 2.6 bpm due to lower ECD.
POH to pick up Sperry Resistivity tool.
SAFETY MEETING. Review procedure, hazards and
mitigation for BHA change. Review ice build-up in derrick as a
safety concern.
Flow Check well. Well full with 8.6 PPG New FloPro. No Flow
for 30 minutes_ No Fluid loss_
M/U BHA #7, New HYC DS49, 3.75" bit, 1.04 deg motor,
Sperry Resistivity tool and MWD and SWS MHA. Total length
= 90.16 ft.
Test Sperry Resistivity tool.
RIH with lateral MWD BHA #7. SHT tools - OK. RIH clean thru
window. Tag TD @ 13332'. Correct CTD to 13300'. PVT =
324bbls.
Log resistivity MAD pass. MWD tool pulsing intermittently
across 28degs DLS area. Troubleshoot & rectify pulses.
Continue logging MAD pass up to 12846'.
Tie-into RA PIP tag - subtract 5' from CTD.
RBIH to btm tagged @ 13296'.
Orient TF to 90L.
Drill to 13351' with 90L TF, 2.6/2.6bpm, 2950/3100psi, 75fph
ave ROP.
Orient & drill to 13383' with 65L TF, 2_6/2.6bpm, 2950/3300psi,
100fph ave Rap.
Orient TF to 90R
Orient & drill to 13451' with 40-25R TF, 2.6/2.6bpm,
2950/3300psi, 80fph ave ROP. TF walking left_
Wiper clean to window. RBIH to btm.
Orient TF to 90R
Drill to 13473' with 65R TF, 2.6/2.6bpm, 2950/3300psi, 65fph
Printed: 11/12/2003 11:02:05AM
-
.
BP EXPLORATION
Operations Summary Report
Page 6 of 14
Legal Well Name: S-102
Common Well Name: S-102 Spud Date: 9/14/2000
Event Name: REENTER+COMPLETE Start: 9/27/2003 End:
Contractor Name: NORDIC CALISTA Rig Release: 11/5/2003
Rig Name: NORDIC 1 Rig Number: N1
Date From - To Hours ¡Task Code NPT Phase Description of Operations
...........---.--- _..._.... _n _._._______...
1 0/28/2003 04:25 - 05:05 0.67 DRILL P PROD1 ave ROP. Not achieving any RH turn with 1.04deg motor.
POOH to reset motor bend. PVT = 294bbls.
05:05 - 07:30 2.42 DRILL P PROD1 POOH lateral drilling BHA#7. Bleed down lAP from 975psi to
175psi.
07:30 - 09:45 2.25 DRILL P PROD1 C/O Sperry MWD probe, Check bit and motor, Bit in new
condition, Adjust motor to 1.69 deg bend. C/O Sperry
Resistivity tool and surface check tool. M/U MHA.
09:45 - 12:15 2.50 DRILL P PROD1 RIH with BHA #8 with 1.69 deg motor and Hycalog DS49 Bit.
Shallow hole test. RIH.
12:15 - 12:30 0.25 DRILL P PROD1 Orient TF to low side to get thru window.
12:30 - 13:00 0.50 DRILL P PROD1 RIH and tag TD at 13,547 ft. Correct CTD to 13,473 ft. [-74 ft).
13:00 - 13:10 0.17 DRILL P PROD1 Orient TF to 70R.
13:10 -14:15 1.08 DRILL P PROD1 Drilling, 2.6/2.6 bpm, 2900/3300 psi, 70R TF, 150 FPH,
Drilled to 13,585 ft.
14:15 -15:10 0.92 DRILL P PROD1 Attempt 2x to orient TF to 50R - flopping to 11 OR. Re-orient to
50R.
15:10-15:30 0.33 DRILL P PROD1 Drill to 13612' with 88R TF, 2.7/2.7bpm, 3250/3400psi, 100fph
ave ROP. Inclination drop to 88.9degs.
15:30 - 15:45 0.25 DRILL P PROD1 Orient TF to 30R. 1.69deg motor averaging 20degs DLS. Have
achieved required RT. Orienting to build angle before pulling for
1.04deg motor@ +/-13700'.
15:45 - 15:55 0.17 DRILL P PROD1 Drill to 13625' with 30R TF, 2.7/2.7bpm, 3250/3400psi, 75fph
ave ROP.
15:55 - 16:40 0.75 DRILL P PROD1 Wiper clean to window. RBIH to btm.
16:40 - 17:05 0.42 DRILL P PROD1 Drill to 13658' with 30R TF, 2.7/2.7bpm, 3250/3400psi, 80fph
ave ROP.
17:05 - 17:10 0.08 DRILL P PROD1 Orient TF to 70R.
17:10 -18:05 0.92 DRILL P PROD1 Drill to 13700' with 90-100R TF, 2.7/2.7bpm, 3250/3400psi,
50fph ave ROP. Stacking wt.
18:05 - 20:30 2.42 DRILL P PROD1 POOH drilling BHA#8. Baker choke leaking - will rebuild when
OOH.
20:30 - 21 :30 1.00 DRILL P PROD1 PJSM for changing BHA and rebuilding Baker choke. Change
motor and adjust bend to 1.04 degrees. Bit in good condition.
21 :30 - 22:45 1.25 DRILL P PROD1 Download and confidence test MWD.
22:45 - 23:00 0.25 DRILL P PROD1 MU injector.
23:00 - 00:00 1.00 DRILL P PROD1 RIH. Shallow hole test. RIH.
10/29/2003 00:00 - 02:00 2.00 DRILL P PROD1 RIH. Tie in to PIP tag. _16' correction. RIH.
02:00 - 03:30 1.50 DRILL P PROD1 Orient. Drill at 80 - 90R, 2.6/2.6/3,170 psi.
03:30 - 04:40 1.17 DRILL P PROD1 Orient to 180. Drill from 13,746' to 13,770'.
04:40 - 06:40 2.00 DRILL P PROD1 Orient to 80R. Drill to 13823', 2.6/2.6/3,150 psi, 70 fph.
06:40 - 06:50 0.17 DRILL P PROD1 Orient TF to 11 OR. PVT = 223bbls. Should be into KC4 now.
Plan to level & start drop as per the prognosed dip.
06:50 - 07:45 0.92 DRILL P PROD1 Drill to 13850' with 110-130R TF, 2.7/2.7bpm, 3250/3400psi,
35fph ave ROP. Stacking wt.
07:45 - 08:40 0.92 DRILL P PROD1 Wiper clean to window. RBIH to 13703'.
08:40 - 09:00 0.33 DRILL P PROD1 Pump up off btm full surveys every 30' from 13703' for azimuth
corrections due to geomagnetic storm.
09:00 - 10:30 1.50 DRILL P PROD1 Drill to 13883' with 135R TF, 2.7/2.7bpm, 3000/3180psi, 30fph
ave ROP.
10:30 - 10:45 0.25 DRILL P PROD1 Orient TF to 90R.
10:45 - 11 :30 0.75 DRILL P PROD1 Drill to 13913' with 90R TF, 2.7/2.7bpm, 3000/3180psi, 40fph
ave ROP.
11 :30 - 11 :40 0.17 DRILL P PROD1 Short 100' wiper.
Printed: 11/1212003 11 :02:05 AM
-
.
Page 7 of 14
BP EXPLORATION
Operations Summary Report
PROD1 Orient & drill to 14000' with 80-90R TF, 2.7/2.7bpm,
3000/3250psi, 75fph ave ROP. Triggering MWD full surveys by
cutting back flow momentarily & drilling ahead while data is
being pumped up. IFR Corrected surveys moved TD approx.
1 0' to the west.
Wiper clean to window. RBIH clean to btm. Call for fresh fto-pro
mud.
Orient & drill to 14150' with 100-120R TF, 2.7/2.7bpm,
3100/3350psi, 75fph ave ROP. Wt stacking with 3k run-in wt.
New mud & trucks arrive site. PVT = 175bbls.
Wiper clean to 7700'.
CBU to see if we'll get cutting slugs back. No noticeable
increase in cuttings on bottoms up. RIH.
Tie in to RA tag. -28.5' correction.
RIH. Start new mud down coil at 13,100'.
Drill to 14,275' with 2.7/2.7 3,300/3,400 psi, 95 fph. IA=370
psi, OA=225 psi.
Drill to 14,284'.
Wiper trip to 12,865'.
Drill to 14,361' at 2.65/2.65/3,280 psi. TF rolling left. Orient
as needed to keep TF 80-90L.
Orient to 60L. Drill. TF rolling left. Orient 20L. Drill to 14,423'.
Experiencing some differential sticking. Bleed IA to 20 psi and
OA to 0 psi.
Drill to 14,430' at 2.6/2.6/3,260 psi.
Wiper clean to window. 30k up wt & 5.5k run-in wt. RBIH clean
& start tagging hard spots from 14385'. Set down @ 14412'.
P/U heavy @ 61k. RBIH & stack out @ 14405'. Having very
erratic PIUs - seems like we crossed a fault @ +/-14386'.
PROD1 Ream tight spots from 14407' to 14411' with 11L TF,
2.65/2.65bpm, 3330/3650psi & CBU for Geo to check samples.
Geo confirms some black shale in BU samples probably from
the HRZ.
PROD1 Paint EOP flags @ 12700' & 11000'. POOH lateral drilling
BHA#9. Meanwhile review situation with ANC team & decide to
OH sidetrack after testing BOPE. Observed no noticeable
increase in cuttings while circ OOH.
OOH. SIB injector. PJSM. UO BHA. Bit grades 1/2/1. Download
memory resistivity data. Pull/test man-riding winch - failed -
could not regulate below 2k. Will changeout regulator & retest.
Perform weekly BOPE pressure / function test. AOGCC test
witness waived by Chuck Scheve.
P/U injector. Cut off 8' of CT. Rehead & M/U DS CTC. Pull test
to 37k. Pressure test inner reel valve & CTC to 3500psi - OK.
PJSM for PU BHA. PU sidetrack BHA.
RIH. Tag up on GLM at 5,783'. Orient and get past GLM. No
correction at 10,992' EOP flag. RIH.
Tie in to RA marker.
Tie in to RA marker. -6' correction.
RIH to 14,275'.
Orient to 175 R.
Trough from 14,275' to 14,250' at 20 fph, 2.4/2.4 4,100 psi.
RIH to 14,275' at 760 fph, 2.4/2.54,070 psi. Trough up to
Legal Well Name:
Common Well Name:
Event Name:
Contractor Name:
Rig Name:
S-102
S-102
REENTER+COMPLETE
NORDIC CALISTA
NORDIC 1
Date
I '
From - To I Hours ¡ Task Code NPT Phase
....---.--
10/29/2003 11 :40 - 12:55
1.25 DRILL P
12:55 - 14:00 1.08 DRILL P PROD1
14:00 - 16:10 2.17 DRILL P PROD1
16:10 -18:05 1.92 DRILL P PROD1
18:05 - 20:30 2.42 DRILL P PROD1
20:30 - 20:40 0.17 DRILL P PROD1
20:40 - 21 :15 0.58 DRILL P PROD1
21 :15 - 00:00 2.75 DRILL P PROD1
1 0/30/2003 00:00 - 00:15 0.25 DRILL P PROD1
00:15-01:00 0.75 DRILL P PROD1
01 :00 - 03:45 2.75 DRILL P PROD1
03:45 - 06:00 2.25 DRILL P PROD1
06:00 - 06:35 0.58 DRILL P PROD1
06:35 - 08:00 1.42 DRILL P PROD1
08:00 - 08:45
0.75 DRILL P
08:45 - 12:15
3.50 DRILL P
12:15-13:30 1.25 DRILL P PROD1
13:30 -18:15 4.75 DRILL P PROD1
18:15 - 19:00 0.75 STKOH C PROD1
19:00 - 21:00 2.00 STKOH C PROD1
21 :00 - 23:55 2.92 STKOH C PROD1
23:55 - 00:00 0.08 STKOH C PROD1
10/31/2003 00:00 - 00:40 0.67 STKOH C PROD1
00:40 - 01 :20 0.67 STKOH C PROD1
01 :20 - 01 :30 0.17 STKOH C PROD1
01:30-04:10 2.67 STKOH C PROD1
Start: 9/27/2003
Rig Release: 11/5/2003
Rig Number: N1
Spud Date: 9/14/2000
End:
Description of Operations
....-...-...-----.... ..
......____.. ___..._ ·___··._____.___n__
Printed: 11/12/2003 11:02:05AM
-.-r
.
Page 8 of 14
BP EXPLORATION
Operations Summary Report
PROD1 14,250' again at 20 fph, 2.4/2.4 4,020 psi
PROD1 RIH at 1 fpm, 2.4/2.4 4,030 psi. Start getting slight motor work
at 14,262'. Time drill at 0.1'/5 minutes at 14,275' to 14,277'.
Shut down pump and slack off to see if we are getting
sidetracked. Stacking some weight. Bring up pump to 2.4
bpm. Getting 200 psi differential and reactive torque. Continue
drilling with 250 psi differential at 60 fph to 14,296'. PU and get
a click. Set back down and TF is all over the place. PU and
orient to 167R. Drill ahead getting good differential and
reactive torque. SIT pt taken @ 14270'.
PROD1 Continue drilling OH sidetrack to 14342' with 165L TF,
2.4/2.4bpm, 4050/4250psi, 90fph ave ROP. Circ pressure
bump up to 4900psi @ 2.4bpm - seems like a plugged nozzle.
Observe nozzle unplug with circ pressure down to 4200psi @
2.4bpm.
Orient & drill sidetrack to 14355' with 130L TF, 2.4/2.4bpm,
4050/4300psi, 100fph ave ROP.
Orient TF to 21 L. 31 k up wt & 6.5k run-in wt.
Drill to 14370' & TF is rolling all over the dial.
Reorient TF to 21 L.
Drill sidetrack to 14390' with 15L TF, 2.4/2.4bpm,
4100/4350psi, 100fph ave ROP. 1.5degs extreme motor
averaged 15degs DLS instead of the expected 18degs.
Wiper clean to 14200'. Orient TF to 170R. RBIH clean thru SIT
pt & tag TD @ 14390'. P/U clean.
POOH OH sidetrack BHA#10. Saw slight O/Pull bobble @
11547' (X- nipple). Started feeling agitator vibrations from
7700'.
OOH. SIB injector. PJSM. Check derrick for ice build-up -
none. UO BHA. Bit grades 1/2/1. Check extreme motor - OK.
Check orienter - piston is flooded - will C/O.
Reset extreme motor bend to 1.40degs & M/U drilling BHA #11
with new DS49 bit, Sperry MWD/EWR, PWD, new orienter with
18/32" equalizer restrictor size & new Andergauge agitator tool.
Scribe tools & initialize resistivity tool. M/U MHA & injector.
RIH drilling BHA #11 to 2000'. SHT tools @ 2.67bpm/3780psi-
not getting orienter clicks.
POOH BHA #11.
OOH. SIB injector. Check orienter - found nothing amiss. C/O
equalizer restrictor size to 15/32".
RBIH with drilling BHA #11 to 2000'. SHT tools @
2.74bpm/3830psi- getting incomplete orienter clicks - one
10deg click per 5 cycles.
POOH BHA #11.
RBIH with drilling BHA #11 to 2000'. SHT tools @
2.77bpm/3850psi - OK - orienter getting 3 for 3.
Continue RIH drilling BHA #11.
Tie in to RA tag. -7.5' correction. IA=16 psi, OA=O.
RIH to 14,373'.
Orient to 90L.
Drill to 14,478' at 2.5/2.5 3,700 psi/3,920 psi TF 70-90L. GR
increasing from 14,405' to 14,428'.
Orient
Legal Well Name:
Common Well Name:
Event Name:
Contractor Name:
Rig Name:
S-102
S-102
REENTER+COMPLETE
NORDIC CALISTA
NORDIC 1
ate
,
From - To ! Hours Task! Code NPT Phase
.....--.----...
10/31/2003 01:30-04:10
04:10 - 06:30
2.67 STKOH C
2.33 STKOH C
06:30 - 07:10
0.67 STKOH C
07:10 - 07:20 0.17 STKOH C PROD1
07:20 - 07:35 0.25 STKOH C PROD1
07:35 - 07:55 0.33 STKOH C PROD1
07:55 - 08:10 0.25 STKOH C PROD1
08: 1 0 - 08:25 0.25 STKOH C PROD1
08:25 - 09: 1 0 0.75 STKOH C PROD1
09:10 - 12:00 2.83 STKOH C PROD1
12:00 - 12:45 0.75 STKOH C PROD1
12:45 - 14:05 1.33 STKOH C PROD1
14:05 - 14:45 0.67 STKOH C PROD1
14:45 - 15:10 0.42 STKOH X PROD1
15:10 - 15:45 0.58 STKOH X PROD1
15:45 - 16:40 0.92 STKOH X PROD1
16:40 - 17:00 0.33 STKOH X PROD1
17:00-18:15 1.25 STKOH X PROD1
18:15 - 20:05 1.83 STKOH C PROD1
20:05 - 20:25 0.33 STKOH C PROD1
20:25 - 21 :25 1.00 STKOH C PROD1
21 :25 - 21:45 0.33 STKOH C PROD1
21:45-23:10 1.42 STKOH C PROD1
23:10 - 23:30 0.33 STKOH P PROD1
Start: 9/27/2003
Rig Release: 11/5/2003
Rig Number: N1
Spud Date: 9/14/2000
End:
Description of Operations
___.___..____.._.________.__ .___.__._ ___u_.._.___.. _... _...._ _. n___ ..
"."- .--....---
Printed: 11/12/2003 11 :02:05 AM
.....
.
BP EXPLORATION
Operations Summary Report
Legal Well Name: S-102
Common Well Name: S-102
Event Name: REENTER+COMPLETE Start: 9/27/2003
Contractor Name: NORDIC CALISTA Rig Release: 11/5/2003
Rig Name: NORDIC 1 Rig Number: N1
Date I From - To ¡ Hours! Task I COde! NPT Phase I
...._-.... --.--------_ .___._ ---_.1.... ___...__"..
10/31/2003 23:30 - 00:00 0.50 STKOH P PROD1
11/1/2003 00:00 - 01 :20 1.33 DRILL P PROD1
01 :20 - 03:00 1.67 DRILL P PROD1
03:00 - 03:10 0.17 DRILL P PROD1
03: 10 - 03:30 0.33 DRILL P PROD1
03:30 - 03:55 0.42 DRILL P PROD1
03:55 - 04:05 0.17 DRILL P PROD1
04:05 - 04:34 0.48 DRILL P PROD1
04:34 - 04:39 0.08 DRILL P PROD1
04:39 - 06:00 1.35 DRILL P PROD1
06:00 - 06:40 0.67 DRILL P PROD1
06:40 - 07:35 0.92 DRILL P PROD1
07:35 - 07:50 0.25 DRILL P PROD1
07:50 - 08:20 0.50 DRILL P PROD1
08:20 - 09:05 0.75 DRILL P PROD1
09:05 - 09:15 0.17 DRILL P PROD1
09:15 - 09:55 0.67 DRILL P PROD1
09:55 - 10:00 0.08 DRILL P PROD1
10:00 - 10:15 0.25 DRILL P PROD1
10:15 -10:45 0.50 DRILL P PROD1
10:45 - 11 :00 0.25 DRILL P PROD1
11:00 -11:55 0.92 DRILL P PROD1
11 :55 - 12:15 0.33 DRILL P PROD1
12:15 - 12:50 0.58 DRILL P PROD1
12:50 - 13:10 0.33 DRILL P PROD1
13:10 - 13:20 0.17 DRILL P PROD1
13:20 - 13:45 0.42 DRILL P PROD1
13:45 - 15:50 2.08 DRILL P PROD1
15:50 - 16:10 0.33 DRILL P PROD1
16:10 - 17:10 1.00 DRILL P PROD1
Page 9 of 14
Spud Date: 9/14/2000
End:
Description of Operations
--- ------...-- . - .._------.
RIH. SO=3,000 Ibs. 2.38/2.38 3,660 psi off bottom. Drill to
14,500'.
Drill to 14,550'.
Wiper trip to window. Hole in good shape.
Drill to 14,560' at 2.36/2.36 3,590 psi /3,700 psi TF=HS.
Orient.
Drill to 14,575' at 2.4/2.4 3,900 psi 120L. Surveys showing
high build rate. Getting pushed by formation.
Orient LS.
Drill to 14,582' at 2.4/2.4 4,000 psi.
Orient 99 L.
Drill to 14,600' at 2.3/2.33,640 psi. Interval that was drilled LS
shows slight build. Definitely being pushed by formation.
Orient. Bring pump up and pressure is very high, 4,200 psi at
2.3 bpm. Bleed off pressure and bring pump back up.
Pressure still high - suspect cutting loading in the annulus.
Wipe hole clean to window & see pressure down to 3800psi @
2.3bpm. RBIH clean to btm.
Orient TF to 100L. 31 k up wt & 4k run-in wt. Geo wants to hold
88-89degs incl.
Drill into a brick wall @ 14601' with 120L TF, 2.4/2.4bpm,
4100/4700psi. Finally grind thru hard spot.
Orient & drill to 14633' with 80L TF, 2.4/2.4bpm, 4100/4250psi,
5k WOB & 65fph aye ROP.
Orient 1 click & drill to 14641' with 55L TF, 2.4/2.4bpm,
4100/4250psi, 4k WOB & 55fph aye ROP. Meanwhile swap
well to new Flopro mud with 4% L-T, 1.5% F-L & 6ppb K-G.
Orient 1 click & drill to 14665' with 30-15L TF, 2.4/2.4bpm,
4100/4350psi, 4k WOB & 35fph aye ROP.
Orient TF to 70R.
Drill to 14672' with 70R TF, 2.4/2.4bpm, 4100/4300psi, 4k
WOB & 45fph aye ROP. MWD tool shutting off.
Wipe hole. Restart MWD & orient TF to 90R.
Drill to 14684' with 90R TF, 2.4/2.4bpm, 4100/4250psi, 3k
WOB & 55fph aye ROP. Getting better wt transfer & 6k slack
off wt with new mud.
Orient 1 click & drill to 14733' with 105R TF, 2.4/2.4bpm,
4100/4400psi, 3k WOB & 55fph aye ROP. Stalled & got 2
clicks.
Drill to 14747' with 135-90R TF, 2.4/2.4bpm, 4100/4400psi, 3k
WOB & 40fph aye ROP. TF rolled up to 90R.
Orient 1 click & drill to 14768' with 125R TF, 2.4/2.4bpm,
4100/4400psi, 6k WOB & 35fph aye ROP.
Drill to 14780' with 145R TF, 2.4/2.4bpm, 3900/4200psi, 6k
WOB & 40fph aye ROP.
Orient TF around to 90R.
Drill to 14812' with 90-95R TF, 2.4/2.4bpm, 3900/4200psi, 4k
WOB & 85fph aye ROP.
Wipe hole clean to window & MAD pass for resistivity data from
14400' to 14300'.
Tie-into RA PIP tag - add 11' to CTD.
RBIH clean & set down @ 14387'. Check survey & confirm
we're in old hole. PBUH & orient TF to LS. RBIH clean thru SfT
Printed: 11/12/2003 11:02:05AM
~
.
Page 10 of 14
BP EXPLORATION
Operations Summary Report
pt into new hole to 10450'. Orient TF to HS.
Backream SfT pt from 14350' to 14250' with HS TF,
2.4/3900psi & 200fph ave ROP. Orient TF to LS.
RBIH clean thru SfT pt to TD tagged @ 14823'.
Orient TF to 50R. 29k up wt & 6.2k slack-off wt.
Drill to 14845' with 50R TF, 2.4/2.4bpm, 3900/4200psi &
100fph ave ROP.
Drill ahead to 14,871' at 2.4/2.25 3,710 psi 90 -115R TF..
IA=45, OA=O, Pit volume=263 bbls.
Orient HS. Start to drill. TF fell to 90R. Orient HS again.
Losing at 0.7 to 1 bpm.
Seeing increase in chert in samples. May be getting close to
HRZ. Decide to CBU. No HRZ in sample. Resistivity
decreasing. Plan to bring inclination up to 92 degees, currently
at 89 degrees. Wiper trip while CBU.
Orient HS and drill at 2.4/1.9 3,940 psi to 14,890'.
Orient to 70 R and drill at 2.3/1.753,900 psi. Start new mud
down coil. Stacking weight while trying to drill. Drill to 14,947'.
Inclination dropping. Need to orient HS.
Wiper trip to window.
Orient to HS and drill at 2.3/1.1 4,280 psi to 14,974'.
Orient to 90R. Getting mud back with pump down. Pump 2.4
bpm in, getting 3.0 bpm out. TF dropped to 120R.
Orient to 80L. Getting 1 for 1 returns.
Making very little progress while trying to drill. Motor stalling.
Pressure increased to 4,300 psi off bottom at 2.3 bpm. Have
been seeing 15 - 20% chert in samples. Need to check out
tools for wear/failure due to agitator.
Wiper to 12000'. Meanwhile Geo says we may call TD. Thus
decide to tie-in & condition hole before pulling for a possible
OH logging run.
RBIH to 12900'.
Tie-into RA PIP tag - add 9' to CTD.
RBIH clean thru SfT pt @ 113L TF. Continue RIH clean & tag
TD 2x @ 14980'. P/U clean.
POOH @ 40fpm, circ @ 1.5bpm & laying in new Flo-pro mud
with 4% L-T in OH. Paint CT EOP flags @ 14800' & 12600'.
Continue POOH @ 2.4bpm & loosing ca. 0.25bpm. Got back
little gas bubble @ 7547'. SI well. Lost total of 33bbls mud
since POOH.
DPRB PROD1 WHP build up to 813psi after 10 mins. Open up choke & bled
down WHP to 80psi with well flowing. SI well again & WHP
build back up & stabilize @ 725psi. Suspect wellbore breathing
- decide to RBIH to window to circ out any influx.
Open up well & WHP drop to 200psi with well flowing. RBIH
getting 1: 1 to 12807' with +/-100psi back WHP - out density
increase from 6.85ppg to 8.50ppg with no gas in returns.
SI well. WHP build up & stabilize @ 510psi after 10 mins. PVT
= 269bbls.
Open up well & WHP drop to 100psi with well flowing. CBU @
2.4bpm/2.4bpm & 3600psi. No influx circ out. PVT = 261bbls.
Seems like wellbore is breathing back the lost mud.
SID job, regroup & held an operations safety meeting.
Legal Well Name:
Common Well Name:
Event Name:
Contractor Name:
Rig Name:
8-1 02
S-102
REENTER+COMPLETE
NORDIC CALISTA
NORDIC 1
Date From - To ¡ Hours Task Code NPT Phase
........-.-.----...-.
11/1/2003 16:10 - 17:10 1.00 DRILL P PROD1
17:10 - 17:30 0.33 DRILL P PROD1
17:30 - 17:50 0.33 DRILL P PROD1
17:50 - 17:55 0.08 DRILL P PROD1
17:55 - 18:15 0.33 DRILL P PROD1
18:15 - 20:00 1.75 DRILL P PROD1
20:00 - 20:50 0.83 DRILL P PROD1
20:50 - 23:00 2.17 DRILL P PROD1
23:00 - 00:00 1.00 DRILL P PROD1
11/2/2003 00:00 - 01 :20 1.33 DRILL P PROD1
01 :20 - 03:40 2.33 DRILL P PROD1
03:40 - 04:45 1.08 DRILL P PROD1
04:45 - 05:00 0.25 DRILL P PROD1
05:00 - 05:35 0.58 DRILL P PROD1
05:35 - 05:45 0.17 DRILL P PROD1
05:45 - 06:50 1.08 DRILL P PROD1
06:50 - 07:10 0.33 DRILL P PROD1
07:10 - 07:30 0.33 DRILL P PROD1
07:30 - 08:35 1.08 DRILL P PROD1
08:35 - 10:45 2.17 DRILL P PROD1
10:45 - 11: 1 0
0.42 DRILL N
11:10-12:10 1.00 DRILL N DPRB PROD1
12:10 - 12:20 0.17 DRILL N DPRB PROD1
12:20 - 13:20 1.00 DRILL N DPRB PROD1
13:20 - 14:20 1.00 DRILL N DPRB PROD1
Start:
Rig Release:
Rig Number:
Spud Date: 9/14/2000
End:
9/27/2003
11/5/2003
N1
Description of Operations
Printed: 11/12/2003 11 :02:05 AM
-
.
BP EXPLORATION
Operations Summary Report
Page 11 of 14
Legal Well Name: S-102
Common Well Name: S-102 Spud Date: 9/14/2000
Event Name: REENTER+COMPLETE Start: 9/27/2003 End:
Contractor Name: NORDIC CALISTA Rig Release: 11/5/2003
Rig Name: NORDIC 1 Rig Number: N1
I I
Date ¡ From - To I Hours Task Code NPT, Phase Description of Operations
11/2/2003 13:20 - 14:20 1.00 DRILL N DPRB PROD1 Reviewed well control situation, change in well plan, future
operations plans & procedures to ensure all personnel are on
the same page. Meanwhile open up well & perform exhale test
- got back 7bbls after 1 hr.
14:20 - 14:40 0.33 DRILL N DPRB PROD1 SI well. WHP remain @ Opsi after 15mins. PVT = 269bbls.
Open up well & had a negligible flow. Decide to POOH.
14:40 - 16:00 1.33 DRILL N DPRB PROD1 POOH @ 40fpm, circ @ 1.3bpm & 2150psi to 7500'.
16:00 - 17:15 1.25 DRILL P PROD1 POOH from 7500' @ 100fpm, circ @ 2.4bpm & 3600psi to
500'. Lost total of6bbls mud while POOH. PVT = 191bbls.
17:15 - 18:30 1.25 DRILL P PROD1 Held PJSM with all personnel to reviewed well situation & BHA
UD procedures. Meanwhile open up well & perform exhale test
- got back 5bbls after 1.25hrs.
18:30 - 19:45 1.25 DRILL P PROD1 Shut in well and monitor. WHP built to 150 psi in 15 minutes.
Bleed off pressure through choke. SI well and observe again
for 15 minutes, same result. Open up well. Well flowing
slowly.
19:45 - 21 :30 1.75 DRILL P PROD1 LD BHA. Connection on BHA were over torqued while down
hole. Egged one box breaking the connection. Found two
wash outs in BHA. One at the top of the orienter and one in
the XO above the equilizer sub. Both check valve pins were
sheared. Will have all BHA components sent in for inspection.
Secure well.
21 :30 - 21 :45 0.25 DRILL P PROD1 PJSM for PU logging tools.
21:45 - 22:30 0.75 DRILL P PROD1 Download MWD tools and clear out pipe shed. Bring up RA
sources.
22:30 - 23:15 0.75 EVAL P PROD1 MU Reeves logging tools. Connect battery at 22:55. Caliper
will open in 4.5 hrs. Test tools. Load RA sources.
11/3/2003 00:00 - 01 :30 1.50 EVAL P PROD1 RIH w/ Reeves logging tools. Correct to 12,600' EOP flag, -16'
correction.
01 :30 - 06:00 4.50 EVAL P PROD1 Log down in OH at 30 fpm. 0.76 bpm /1.06 bpm. Set down at
14,370'. Attempt to work past several times. PU=34,800 Ibs,
SO=3,000 Ibs. Pull up hole to 14,250', above OH sidetrack
point. Run back in hole slowly. Set down at 14,370'. Wait 15
minutes for caliper arm to open. Log up at 30 fpm to 11,500'
w/o pumping. Flag pipe at 12,700' and 10,500' EOP.
06:00 - 06:40 0.67 EVAL P PROD1 POOH logging tools. Getting gas @ 4122'.
06:40 - 07: 10 0.50 EVAL N DPRB PROD1 SI well. WHP stabilize @ 278psi after 15mins.
07:10 - 08:00 0.83 EVAL N DPRB PROD1 Open up well & WHP drop to 100psi with well flowing. Circ &
getting back crude flashing out gas @ surface. Mud-in cut
down to 8.55ppg. SI well & WHP come up to 340psi. Review
situation with ANC team & decide to RBIH to TOW & circ in
clean 8.9ppg flopro mud. Call for 8.9ppg mud.
08:00 - 10:00 2.00 EVAL N DPRB PROD1 RBIH to 12800' with +/-150psi back WHP & taking back gassy
returns to the tigger tank.
10:00 - 11 :45 1.75 EVAL N DPRB PROD1 Park @ 12800' & circ@ min rate with +/-150psi WHP while
W.O. new mud to arrive. Take back gassy returns to the tigger
tank.
11 :45 - 15:40 3.92 EVAL N DPRB PROD1 Circ in 8.9ppg fresh flopro mud @ 1bpm/1660-1815psi with
+/-150psi WHP taking back gassy returns to the tigger tank. Kill
well & observe out density increase from total gas to 8.15ppg.
Open up well & start taking returns to pits - no gas in returns.
Lost a total of 77bbls during kill.
15:40 -17:10 1.50 EVAL N DPRB PROD1 Continue circ new mud around @ 1.07/0.67bpm &
Printed: 11/12/2003 11 :02:05 AM
-
.
~.
BP EXPLORATION
Operations Summary Report
Page 12 of 14
Legal Well Name: S-102
Common Well Name: S-102 Spud Date: 9/14/2000
Event Name: REENTER+COMPLETE Start: 9/27/2003 End:
Contractor Name: NORDIC CALISTA Rig Release: 11/5/2003
Rig Name: NORDIC 1 Rig Number: N1
Hours I Task! Code ;
Date From - To NPT Phase Description of Operations
;
11/3/2003 15:40 - 17:10 1.50 EVAL N DPRB PROD1 1882-1912psi. Out density gradually increase to 8.75ppg. Out
density on mud scale - 8.9ppg.
17:10-17:35 0.42 EVAL N DPRB PROD1 SI well. WHP stabilize @ 565psi after 25mins.
17:35 - 18:30 0.92 EVAL N DPRB PROD1 Open up well & got gas bubble @ surface. Line-up to the gas
buster & circ out gas bubble. Continue circ mud around while
W.O additional mud order.
18:30 - 20:45 2.25 EVAL N DPRB PROD1 Circulate and still getting gas cut mud. Circulate 8.9 ppg mud
in and out.
20:45 - 00:00 3.25 EVAL N DPRB PROD1 POOH at 60 fpm pumping 1.46 bpm in getting 0.49 bpm out.
Losing about 0.65 bpm. Vary pulling speed and pump rate to
get clean sweep of annulus. Still losing, not getting 1 for 1
returns. Resume 60 fpm and 1.5 bpm in.
Returns are increasing. Getting .78 bpm out at 8,550', 0.94
bpm out at 7,400', 1.12 bpm out at 5,000'.
Gas to surface at 2,300'. Out MM plugged. Recoved metal
from MM.
11/4/2003 00:00 - 00:30 0.50 EVAL P PROD1 POOH wI logging tools.
00:30 - 01 :00 0.50 EVAL P PROD1 Monitor well while holding PJSM for LD logging tools. Well is
dead.
01 :00 - 01 :40 0.67 EVAL P PROD1 LD logging tools and clear cat walk.
01 :40 - 02:30 0.83 CLEAN N SFAL PROD1 MU 3.75" DS 49 wI Baker short radius motor with 1.5 degree
bend. Hanging up on SSV. Adjust bend to 1.1 degree. Still
hanging up.
02:30 - 05:15 2.75 WHSUR N SFAL PROD1 Vac out tree. Visually confirm SSV is partially closed. Call out
pad operator. SSV is electrically actuated and power is
disconnected. Call out electrician.
05:15 - 07:00 1.75 WHSUR N SFAL PROD1 Work on SSV. Jumper 24VDC to hold SSV in current position.
Remove fuseable cap. Pump open SSV & hold valve open with
electricity. Install new right size fuseable. SSV fully open.
07:00 - 07:15 0.25 DRILL P PROD1 PJSM. Reviewed well situation & potential hazards with all
personnel. Reviewed procedure, hazards & mitigation for M/U
cleanout BHA#13. Meanwhile cap well & open up - observe
Opsi WHP.
07: 15 - 08:00 0.75 DRILL P PROD1 M/U cleanout BHA #13 with BHI 1.5 deg bend SR motor, MWD
& used HYC DS49 bit. M/U MHA & injector.
08:00 - 10:25 2.42 DRILL P PROD1 RIH with BHA #13 - observe no severe shavings on CT. SHT
MWD @ 500' & orienter @ 2200' - OK. Continue RIH to 12700'
EOP flag. Subtract 22' from CTD. RIH clean thru window to
12880' .
10:25 - 10:55 0.50 DRILL P PROD1 Log up @ 2.25/2.15bpm & tie-into RA PIP tag - add 13' to
CTD.
10:55 -13:15 2.33 DRILL P PROD1 RBIH clean to 14230'. RIH with 170L TF clean thru SIT pt & set
down @ 14365' (pt of swing from LS to HS). Orient TF as
originally drilled. RIH & set down @ 14510' & 14593. Backream
@ 2.0/1.9bpm & 2850psi to 14550. Reorient & RIH with up to
-5k run-in wt & set down @ 14743' & 14916'. Reorient & RIH
with up to -6k run-in wt to TD tagged @ 14980'. Getting back
gassy returns - take to tiger tank
13:15 -13:35 0.33 DRILL P PROD1 Orient TF to 120R.
13:35 - 14:05 0.50 DRILL P PROD1 Backream to 14320' with 2.5bpm/3700psi & 20fpm. Still taking
gassy returns to tiger tank.
Printed: 11/12/2003 11:02:05AM
......
.
Page 13 of 14
BP EXPLORATION
Operations Summary Report
Continue RIH. Pit volume=306 bbls. Start pumping high lubtex
new mud pill to lay in OH. RIH weight -1000 Ibs at surface.
Add an additional 3 drums of lubetex to the active system. Call
for additionallubtex to bring the system up to 3%.
PROD1 PUH laying in lubtex pill. Pulling at 35 fpm. .86/1.1/1700 psi.
Getting higher returns than we are pumping, and also have
pipe volume to add in. The well continues to breath, or kick on
us. Our plan to pull to the top of the slotted existing pipe, and
pump bottoms up to clean the well and then check for flow prior
to POOH. If the well continues to flow, we wil weight up.
PROD1 Continuing to POH. .67/.42/1351,37 fpm. Returns are now 1
for 1. We will continue with the plan as stated above. Pulled
thru the window with no bobbles or indications of problems.
PROD1 11650', Stop and circulate bottoms up. Tried pumping at 2.5
bpm, had losses. Dropped rate to 2.0 bpm, and had 1 for 1
returns. Pit watcher reports a few drops of oil staining the
returns, but other than that, no indication of any kick. Backside
volume is 114 bbls. Continue to circulate.
PROD1 Got a little gas back at 30 bbls away. It cleared up after 10
bbls. Started getting more gas at 87 bbls away. Ran it thru the
gas buster at a reduced rate of 1.0 bpm. Continue circulating
the well clean.
SFAL PROD1 SWS down time recorded to document the additional time
needed to circulate thru the gas buster at a reduced pump rate.
Pumping at current 1 bpm limit instead of the needed 2 bpm
pump rate.
165 bbls away. Swap back to pits to check returns. Monitor
for 10 minutes. Returns are clean. Pumping .85/.75/1509 psi.
Legal Well Name:
Common Well Name:
Event Name:
Contractor Name:
Rig Name:
8-102
S-102
REENTER+COMPLETE
NORDIC CALISTA
NORDIC 1
Date From - To I Hours Task ,Code NPT Phase
i
------..-...-...
11/4/2003 14:05 -14:20 0.25 DRILL P PROD1
14:20 - 17:00 2.67 DRILL P PROD1
17:00 - 18:00 1.00 DRILL P PROD1
18:00 - 18:30 0.50 DRILL P PROD1
18:30-19:10 0.67 DRILL P PROD1
19:10 - 19:45
0.58 DRILL P
19:45 - 20:40
0.92 DRILL P
20:40 - 20:45
0.08 DRILL P
20:45 - 22:00
1.25 DRILL P
22:00 - 22:50
0.83 DRILL N
22:50 - 23:00 0.17 DRILL P PROD1
23:00 - 00:00 1.00 DRILL P PROD1
11/5/2003 00:00 - 00:25 0.42 DRILL P PROD1
00:25 - 00:40 0.25 DRILL P PROD1
00:40 - 01 :30 0.83 DRILL P PROD1
01 :30 - 01 :50 0.33 CASE P COMP
01:50-02:10 0.33 CASE P COMP
Start: 9/27/2003
Rig Release: 11/5/2003
Rig Number: N1
Spud Date: 9/14/2000
End:
Description of Operations
............-.-.-.-----
RIH clean to TD. Gas returns clearing up but still getting
frequent bubbles.
Backream with 2.5/1.91 bpm, 3600psi & 20fpm. Still getting
gas to surface while back reaming at 14,300'. Back ream OH
ST area at 154L TF, 2 fpm, 2.53/2.58/3,250 psi, PU=29,500
Ibs. RIH to TD. POOH to window.
Flow check well. Well still flowing 1" stream. SI well.
WHP=40 psi. Bleed offWHP.
RIH
POH at 128 fph. Pumping 2.65/1.93/3400 psi. Returns are
clean. Getting 1 for 1 returns when pipe displacement is
factored in.
Continue POH to run liner.
Tag up at surface with drilling BHA. Stand by for flow check
prior to standing back the injector. No flow detected. No
surface pressure detected.
Lay down BHA #14.
Safety meeting prior to running liner. Discussed hazards and
mitigations. Attended by rig SWS and Nordic hands, Sperry,
Baker, BP.
Make up safety joint. Derrick hand inspects derrick for ice
chunks. Clear floor, run blocks up and down vigorously 2 times
with no significant ice falling from derrick.
Printed: 11/12/2003 11:02:05AM
~
.
Page 14 of 14
BP EXPLORATION
Operations Summary Report
Legal Well Name:
Common Well Name:
Event Name:
Contractor Name:
Rig Name:
S-102
S-102
REENTER+COMPLETE
NORDIC CALISTA
NORDIC 1
Start:
Rig Release:
Rig Number:
i
Phase :
9/27/2003
11/5/2003
N1
Spud Date: 9/14/2000
End:
Date From - To Hours Task ¡Code NPT
.__n______ ...-----
11/5/2003 02:10 - 04:10 2.00 CASE P
04:10 - 04:40 0.50 CASE P
04:40 - 06:00 1.33 CASE P
06:00 - 06:30 0.50 CASE P
COMP
COMP
COMP
COMP
06:30 - 06:50 0.33 CASE P COMP
06:50 - 07:45 0.92 CASE N COMP
07:45 - 09:50 2.08 CASE P COMP
09:50 - 10:35 0.75 RUNCOrvP COMP
10:35-11:10 0.58 CASE P COMP
11:10 -12:15 1.08 WHSUR P COMP
12:15 -13:15 1.00 RIGD P POST
13:15 -13:40 0.42 RIGD P POST
13:40 - 15:00 1.33 RIGD P POST
15:00 - 17:00 2.00 DEMOB P POST
Description of Operations
...--------
Make up 2-7/8" x 3-3/16" solid and slotted liner as per
proceedure. Kick drill conducted after running first joint of liner.
Make up Baker GS, Agitator tool, Dowell MHA. Stab on
injector.
RIH with BHA #14 to set slotted liner on bottom.
Weight check up at 12800'=34400 Ibs. Continue RIH with liner.
RIH weight at the window is 5900 Ibs. RIH weight decreased
as we ran in open hole, as expected. 14000'=2600Ibs,
14500'=1400 Ibs, 14800'=-6000 Ibs, very close to lockup.
Having to work pipe to snub in the hole. 14880, hit lockup,
can't snub it in the hole any more. PU, set down 2x with no
success. Kick pumps on to 1.7 bpm, then able to make it to
14917', before stopping. Bring rate up to 2.5 bpm. Pumping
2.4/1.8/3100 psi. Snubbing at -11000 Ibs, but able to RIH.
Caught depth at flag, make -23' correction on the fly, continue
RIH snubbing all the way. Set down at 14,968'. Shoe is within
12' of bottom. Vibrate on liner for a few minutes and did not
make any more progress. Close enough to TD we will release
liner. Shoe is at 14,968', liner top is at 12,738'.
PU and confirm liner is released. POOH to 11,600'.
Wait on KCI.
Displace well to KCI at 2.65 / 2.5 bpm. POOH displacing well
to KCI.
Freeze protect well from 2,500'. Well flowing 1 bpm w/ pump
off. Lay in MeOH at 60/40.
LD liner running tools.
PU lubricator. 300 psi on tubing. Set BPV w/lubricator. LD
lubricator.
Suck out stack. RU BOP slings.
PJSM for ND BOP.
ND BOP. Install tree cap and test. Release rig at 15:00.
Prepare for move to S-24.
Prepare for move to S-24A.
Further Telex entries carried on S-24 DIMS reports.
Printed: 11/12/2003 11:02:05AM
.
AOGCC
Howard Okland
333 W. 7th Ave. Suite 100
Anchorage, AK 99501
DEFINITIVE
Re: Distribution of Survey Data for Well S-102 L 1
Dear Dear Sir/Madam:
Enclosed are two survey hard copies.
Tie-on Survey:
Window / Kickoff Survey:
Projected Survey:
14,231.83' MD
14,270.00' MD
14,980.00' MD
(if applicable)
.
Please call me at 273-3545 if you have any questions or concerns.
Regards,
William T. Allen
Survey Manager
Attachment(s)
""-
~ß't::,\\\~
g).o:3 ~. lð{p
24-Nov-03
RECEIVED
DEe 08 2003
,AJoo~¡Jj
d¡ bas {.;(}f1$. ';ommission
A..l1chorage
.
Halliburton Sperry-Sun
North Slope Alaska
BPXA
PBU_ WOA S Pad
S-102L 1
Job No. AKZZ0002737220, Surveyed: 2 November, 2003
Survey Report
21 November, 2003
.
Your Ref: API 500292297260
Surface Coordinates: 5980655.13 N, 618929.96 E (70021' 20.8844" N, 149002' 02.9105" W)
Grid Coordinate System: NAD27 Alaska State Planes, Zone 4
svy4119
Survey Ref:
Surface Coordinates relative to Project H Reference: 980655.13 N, 118929.96 E (Grid)
Surface Coordinates relative to Structure Reference: 217.17 S, 1009.92 E (True)
Kelly Bushing Elevation: 64.20ft above Mean Sea Level
Kelly Bushing Elevation: 64.20ft above Project V Reference
Kelly Bushing Elevation: 64.20ft above Structure Reference
5i ·.....1 ·....,V-5U:1!
ì:n=nLL.ING se^AVlces
A Halliburton Company
Halliburton Sperry-Sun
Survey Report for PBU_WOA S Pad - S-102L1
Your Ref: API 500292297260
Job No. AKZZ0002737220, Surveyed: 2 November, 2003
BPXA
North Slope Alaska
Measured Sub-Sea Vertical Local Coordinates Global Coordinates Dogleg Vertical
Depth Incl. Azim. Depth Depth Northings Eastings Northings Eastings Rate Section Comment
(ft) (ft) (ft) (ft) (ft) (ft) (ft) (0/100ft)
14231.83 87.160 45.610 6741.47 6805.67 8854.00 N 6089.89 W 5989411.33 N 612700.27 E 7394.36 Tie On Point
14270.00 88.030 42.980 6743.08 6807.28 8881.29 N 6063.26 W 5989439.05 N 612726.46 E 7.252 7426.59 Window Point
14316.91 79.190 40.530 6748.29 6812.49 8916.03 N 6032.24 W 5989474.27 N 612756.93 E 19.545 7467.02
14356.00 75.320 41 .540 6756.91 6821.11 8944.78 N 6007.22 W 5989503.42 N 612781.49 E 10.216 7500.35
14399.29 79.050 39.280 6766.52 6830.72 8976.92 N 5979.87 W 5989535.98 N 612808.33 E 10.007 7537.47 .
14468.33 79.460 27.890 6779.43 6843.63 9033.33 N 5942.42 W 5989592.98 N 612844.88 E 16.218 7600.43
14524.64 84.800 19.220 6787.15 6851.35 9084.40 N 5920.18 W 5989644.40 N 612866.30 E 17.955 7655.01
14551.19 91.110 21.780 6788.10 6852.30 9109.24 N 5910.89 W 5989669.38 N 612875.20 E 25.644 7681.24
14588.23 88.240 15.720 6788.31 6852.51 9144.30 N 5898.99 W 5989704.62 N 612886.54 E 18.101 7718.00
14625.60 84.310 8.420 6790.74 6854.94 9180.73 N 5891.20 W 5989741.17 N 612893.75 E 22.146 7755.26
14659.22 92.040 3.530 6791.81 6856.01 9214.11N 5887.71 W 5989774.61 N 612896.72 E 27.197 7788.64
14694.59 92.500 11 .450 6790.41 6854.61 9249.13 N 5883.10 W 5989809.69 N 612900.76 E 22.412 7823.85
14742.50 92.220 19.670 6788.43 6852.63 9295.20 N 5870.27 W 5989855.97 N 612912.86 E 17.153 7871.58
14786.41 88.090 24.850 6788.31 6852.51 9335.82 N 5853.65 W 5989896.84 N 612928.84 E 15.085 7914.76
14818.68 88.120 28.640 6789.38 6853.58 9364.61 N 5839.14 W 5989925.86 N 612942.89 E 11.739 7945.95
14847.59 89.320 30.440 6790.02 6854.22 9389.76 N 5824.89 W 5989951.23 N 612956.74 E 7.482 7973.51
14922.60 91.820 39.500 6789.28 6853.48 9451.15 N 5781.95 W 5990013.30 N 612998.70 E 12.528 8042.49
14945.44 91.110 42.940 6788.69 6852.89 9468.32 N 5766.90 W 5990030.71 N 613013.47 E 15.374 8062.41
14980.00 91.110 42.940 6788.02 6852.22 9493.62 N 5743.36 W 5990056.37 N 613036.60 E 0.000 8092.05 Projected Survey
All data is in Feet (US Survey) unless otherwise stated. Directions and coordinates are relative to True North.
Vertical depths are relative to S-102. Northings and Eastings are relative to S-102.
Global Northings and Eastings are relative to NAD27 Alaska State Planes, Zone 4. .
The Dogleg Severity is in Degrees per 100 feet (US Survey).
Vertical Section is from S-102 and calculated along an Azimuth of 12.000° (True).
Magnetic Declination at Surface is 25.354° (24-0ct-03)
Based upon Minimum Curvature type calculations, at a Measured Depth of 14980.00ft.,
The Bottom Hole Displacement is 11095.72ft., in the Direction of 328.827° (True).
21 November, 2003 - 16:49
Page 2 of 3
DrillQuest 3.03.05.005
Halliburton Sperry-Sun
Survey Report for PBU_ WOA S Pad - S-102L 1
Your Ref: API 500292297260
Job No. AKZZ0002737220, Surveyed: 2 November, 2003
BPXA
North Slope Alaska
Comments
Measured
Depth
(ft)
Station Coordinates
TVD Northings Eastings
(ft) (ft) (ft)
Comment
14231.83
14270.00
14980.00
6805.67
6807.28
6852.22
8854.00 N
8881.29 N
9493.62 N
6089.89 W
6063.26 W
5743.36 W
Tie On Point
Window Point
Projected Survey
.
Survey tool program for S-102L 1
From
Measured Vertical
Depth Depth
(ft) (ft)
To
Measured Vertical
Depth Depth Survey Tool Description
(ft) (ft)
0.00
12777.19
0.00 12777.19
6749.01 14980.00
6749.01 BP High Accuracy Gyro - AK-1 BP _HG (S-102PB1)
6852.22 AK-6 BP _IFR-AK (S-102L 1 PB1)
.
21 November, 2003 - 16:49
Page 3 of 3
DrillQuest 3.03.05.005
.
AOGCC
Howard Okland
333 W. 7th Ave. Suite 100
Anchorage, AK 99501
Re: Distribution of Survey Data for Well S-102 L 1 MWD
Dear Dear Sir/Madam:
Enclosed are two survey hard copies.
Tie-on Survey:
Window / Kickoff Survey:
Projected Survey:
14,231.83' MD
14,270.00' MD
14,980.00' MD
(if applicable)
.
Please call me at 273-3545 if you have any questions or concerns.
Regards,
William 1. Allen
Survey Manager
Attachment(s)
~5~n\ ~
(~C6--/5 (p
24-Nov-03
RECEIVED
DEe 08 2003
Alaskå 011 & Ga~ Con!). eomroÎtl8ÍPn
Ancñmsge
Halliburton Sperry-Sun
North Slope Alaska
BPXA
PBU_ WOA S Pad
S-102L1 MWD
.
Job No. AKMW0002737220, Surveyed: 2 November, 2003
Survey Report
21 November, 2003
Your Ref: API 500292297260
Surface Coordinates: 5980655.13 N, 618929.96 E (70021' 20.8844" N, 149002' 02.9105" W)
Grid Coordinate System: NAD27 Alaska State Planes, Zone 4
.
Surface Coordinates relative to Project H Reference: 980655.13 N, 118929.96 E (Grid)
Surface Coordinates relative to Structure Reference: 217.17 S, 1009.92 E (True)
Kelly Bushing Elevation: 64.20ft above Mean Sea Level
Kelly Bushing Elevation: 64.20ft above Project V Reference
Kelly Bushing Elevation: 64.20ft above Structure Reference
spe..........:y-suil'1
DRILLING seRVices
A Halliburton Company
Survey Ref: svy4121
Halliburton Sperry-Sun
Survey Report for PBU_WOA S Pad· S-102L1 MWD
Your Ref: AP/500292297260
Job No. AKMW0002737220, Surveyed: 2 November, 2003
BPXA
North Slope Alaska
Measured Sub-Sea Vertical Local Coordinates Global Coordinates Dogleg Vertical
Depth Incl. Azim. Depth Depth Northings Eastings Northings Eastings Rate Section Comment
(ft) (ft) (ft) (ft) (ft) (ft) (ft) (0/100ft)
14231.83 87.160 46.560 6741.49 6805.69 8857.12 N 6097.10 W 5989414.34 N 612693.01 E 7395.91 Tie On Point
14270.00 88.030 42.980 6743.09 6807.29 8884.19 N 6070.25 W 5989441.83 N 612719.43 E 9.644 7427.97 Window Point
14316.91 79.190 40.550 6748.31 6812.51 8918.92 N 6039.23 W 5989477.05 N 612749.90 E 19.534 7468.39
14356.00 75.320 41 .190 6756.93 6821.13 8947.74 N 6014.28 W 5989506.27 N 612774.38 E 10.028 7501.77
14399.29 79.050 41 .520 6766.53 6830.73 8979.42 N 5986.40 W 5989538.38 N 612801.76 E 8.648 7538.56 .
14468.33 79.460 28.420 6779.46 6843.66 9034.88 N 5947.62 W 5989594.45 N 612839.66 E 18.650 7600.87
14524.64 84.800 19.310 6787.18 6851.38 9085.83 N 5925.11 W 5989645.75 N 612861.35 E 18.616 7655.38
14551 .19 91.110 22.030 6788.13 6852.33 9110.64 N 5915.75 W 5989670.70 N 612870.32 E 25.876 7681.60
14588.23 88.240 15.160 6788.34 6852.54 9145.72 N 5903.94 W 5989705.97 N 612881.56 E 20.099 7718.36
14625.60 84.310 7.760 6790.77 6854.97 9182.23 N 5896.54 W 5989742.59 N 612888.39 E 22.381 7755.62
14659.22 92.040 2.890 6791.84 6856.04 9215.66 N 5893.42 W 5989776.06 N 612890.97 E 27.165 7788.96
14694.59 92.500 12.170 6790.43 6854.63 9250.65 N 5888.80 W 5989811.13N 612895.04 E 26.248 7824.16
14742.50 92.220 19.760 6788.46 6852.66 9296.64 N 5875.64 W 5989857.32 N 612907.47 E 15.840 7871.88
14786.41 88.090 24.930 6788.34 6852.54 9337.23 N 5858.96 W 5989898.17 N 612923.51 E 15.068 7915.05
14818.68 88.120 28.810 6789.41 6853.61 9366.00 N 5844.38 W 5989927.16 N 612937.62 E 12.017 7946.21
14847.59 89.320 30.790 6790.05 6854.25 9391.08 N 5830.02 W 5989952.47 N 612951.58 E 8.007 7973.73
14922.60 91.820 40.170 6789.30 6853.50 9452.08 N 5786.54 W 5990014.16 N 612994.09 E 12.940 8042.44
14945.44 91.110 42.530 6788.72 6852.92 9469.22 N 5771.45 W 5990031.53 N 613008.90 E 10.787 8062.34
14980.00 91.110 42.530 6788.05 6852.25 9494.69 N 5748.10 W 5990057.36 N 613031.85 E 0.000 8092.11 Projected Survey
All data is in Feet (US Survey) unless otherwise stated. Directions and coordinates are relative to True North.
Vertical depths are relative to S-102. Northings and Eastings are relative to S-102. .
Global Northings and Eastings are relative to NAD27 Alaska State Planes, Zone 4.
The Dogleg Severity is in Degrees per 100 feet (US Survey).
Vertical Section is from S-102 and calculated along an Azimuth of 12.000° (True).
Magnetic Declination at Surface is 25.354° (24-0ct-03)
Based upon Minimum Curvature type calculations, at a Measured Depth of 14980.00ft.,
The Bottom Hole Displacement is 11099.08ft., in the Direction of 328.809° (True).
21 November, 2003·16:47
Page 2 of 3
DrillQuest 3.03.05.005
Halliburton Sperry-Sun
Survey Report for PBU_ WOA S Pad - S-102L 1 MWD
Your Ref: API 500292297260
Job No. AKMW0002737220, Surveyed: 2 November, 2003
BPXA
North Slope A/aska
Comments
Measured
Depth
(ft)
Station Coordinates
TVD Northings Eastings
(ft) (ft) (ft)
Comment
14231.83
14270.00
14980.00
6805.69
6807.29
6852.25
8857.12 N
8884.19 N
9494.69 N
6097.10 W
6070.25 W
5748.10W
Tie On Point
Window Point
Projected Survey
.
Survey tool program for 5-102L 1 MWD
From
Measured Vertical
Depth Depth
(ft) (ft)
To
Measured Vertical
Depth Depth Survey Tool Description
(ft) (ft)
0.00
12777.19
0.00 12777.19
6749.01 14980.00
6749.01 BP High Accuracy Gyro - AK-1 BP _HG (S-102PB1)
6852.25 MWD Magnetic (8-1 02L 1 PB1 MWD)
.
21 November, 2003 - 16:47
Page 3 of 3
DrillQuest 3.03.05.005
.
AOGCC
Howard Okland
333 W. 7th Ave. Suite 100
Anchorage, AK 99501
DEFINITIVE
Re: Distribution of Survey Data for Well S-102 L 1 PB1
Dear Dear Sir/Madam:
Enclosed are two survey hard copies.
Tie-on Survey:
Window / Kickoff Survey:
Projected Survey:
12,777.19' MD
12,825.00' MD
14,434.00' MD
(if applicable)
.
Please call me at 273-3545 if you have any questions or concerns.
Regards,
William T. Allen
Survey Manager
Attachment(s)
~~~N\~
&03' 160
24-Nov-03
REC,F.i.\IE.D
. ,.,,.,.!!~>,,,,¡ ~ij ".' ",',',
DEC 08 2003
,A.!ljska Oil &: Gas Cons. ~n
Anchorege
Halliburton Sperry-Sun
North Slope Alaska
BPXA
PBU_ WOA S Pad
S-102L1PB1
.
Job No. AKZZ0002737220, Surveyed: 30 October, 2003
Survey Report
21 November, 2003
Your Ref: AP/ 500292297271
Surface Coordinates: 5980655.13 N, 618929.96 E (70021' 20.8844" N, 149002' 02.9105" W)
Grid Coordinate System: NAD27 A/aska State Planes, Zone 4
.
Surface Coordinates relative to Project H Reference: 980655.13 N, 118929.96 E (Grid)
Surface Coordinates relative to Structure Reference: 217.17 S, 1009.92 E (True)
Kelly Bushing E/evation: 64.20ft above Mean Sea Leve/
Kelly Bushing E/evation: 64.20ft above Project V Reference
Kelly Bushing E/evation: 64.20ft above Structure Reference
S¡....a_1 1I'""'\I-SUi!
DAI'L.L.ING SEAVICES
A Halliburton Company
Survey Ref: svy4118
Halliburton Sperry-Sun
Survey Report for PBU_ WOA S Pad - S-102L 1PB1
Your Ref: AP/500292297271
Job No. AKZZ0002737220, Surveyed: 30 October, 2003
BPXA
North Slope A/aska
Measured Sub-Sea Vertical Local Coordinates Global Coordinates Dogleg Vertical
Depth Incl. Azim. Depth Depth Northings Eastings Northings Eastings Rate Section Comment
(ft) (ft) (ft) (ft) (ft) (ft) (ft) (0/100ft)
12777.19 90.920 321.690 6684.81 6749.01 7635.84 N 5936.41 W 5988195.77 N 612873.07 E 6234.73 Tie On Point
AK-6 BP _IFR-AK
12800.00 90.740 321.600 6684.48 6748.68 7653.73 N 5950.56 W 5988213.43 N 612858.64 E 0.882 6249.29
12825.00 90.540 321.510 6684.20 6748.40 7673.31 N 5966.11 W 5988232.76 N 612842.79 E 0.877 6265.21 Window Point
12857.25 82.470 322.410 6686.16 6750.36 7698.64 N 5985.93 W 5988257.77 N 612822.57 E 25.178 6285.86 .
12889.73 73.920 323.340 6692.80 6757.00 7723.96 N 6005.10 W 5988282.78 N 612802.99 E 26.472 6306.64
12919.79 67.140 324.260 6702.82 6767.02 7746.82 N 6021.83 W 5988305.37 N 612785.90 E 22.738 6325.52
12940.94 63.990 323.990 6711.56 6775.76 7762.42 N 6033.12 W 5988320.79 N 612774.37 E 14.939 6338.43
12971.66 70.170 321.270 6723.52 6787.72 7784.88 N 6050.29 W 5988342.98 N 612756.84 E 21.705 6356.84
13003.20 79.150 320.020 6731.86 6796.06 7808.37 N 6069.56 W 5988366.16 N 612737.20 E 28.727 6375.81
13032.39 79.530 324.460 6737.26 6801 .46 7831.04 N 6087.12 W 5988388.55 N 612719.28 E 15.005 6394.33
13063.57 82.560 323.090 6742.12 6806.32 7855.89 N 6105.33 W 5988413.10 N 612700.69 E 10.643 6414.85
13094.24 85.420 324.390 6745.33 6809.53 7880.48 N 6123.36 W 5988437.40 N 612682.26 E 10.233 6435.15
13128.89 89.070 323.110 6746.99 6811.19 7908.38 N 6143.82 W 5988464.98 N 612661.36 E 11.161 6458.19
13160.09 90.350 326.890 6747.15 6811.35 7933.94 N 6161.72 W 5988490.24 N 612643.06 E 12.791 6479.47
13189.80 89.950 330.460 6747.07 6811.27 7959.31 N 6177.16 W 5988515.37 N 612627.22 E 12.091 6501.08
13220.33 91.880 334.680 6746.58 6810.78 7986.40 N 6191.22 W 5988542.23 N 612612.73 E 15.197 6524.65
13253.15 91.570 338.050 6745.60 6809.80 8016.45 N 6204.37 W 5988572.07 N 612599.11 E 10.307 6551.31
13287.88 91.370 333.960 6744.70 6808.90 8048.16 N 6218.48 W 5988603.55 N 612584.49 E 11.787 6579.39
13319.19 90.460 328.790 6744.20 6808.40 8075.63 N 6233.48 W 5988630.78 N 612569.06 E 16.764 6603.14
13354.22 90.470 325.610 6743.92 6808.12 8105.07 N 6252.45 W 5988659.91 N 612549.62 E 9.078 6628.00
13385.09 91.180 324.360 6743.47 6807.67 8130.35 N 6270.16 W 5988684.91 N 612531.52 E 4.656 6649.04 .
13415.49 89.040 324.740 6743.42 6807.62 8155.11 N 6287.79 W 5988709.39 N 612513.49 E 7.150 6669.60
13447.75 90.800 322.770 6743.46 6807.66 8181.13N 6306.86 W 5988735.10 N 612494.01 E 8.189 6691.08
13484.27 89.940 326.600 6743.23 6807.43 8210.92 N 6327.97 W 5988764.55 N 612472.43 E 10.748 6715.83
13521.67 89.460 335.120 6743.42 6807.62 8243.55 N 6346.16 W 5988796.89 N 612453.72 E 22.816 6743.97
13559.65 91.070 342.520 6743.25 6807.45 8278.94 N 6359.88 W 5988832.06 N 612439.45 E 19.939 6775.74
13589.40 88.860 349.210 6743.26 6807.46 8307.77 N 6367.14 W 5988860.77 N 612431.73 E 23.681 6802.43
13619.92 88.500 354.600 6743.97 6808.17 8337.97 N 6371 .43 W 5988890.90 N 612426.96 E 17.695 6831.07
13652.98 94.360 359.070 6743.14 6807.34 8370.95 N 6373.26 W 5988923.84 N 612424.61 E 22.287 6862.95
13682.44 92.510 5.830 6741.38 6805.58 8400.31 N 6372.00 W 5988953.22 N 612425.40 E 23.749 6891.93
21 November, 2003 - 16:48
Page 2 of 4
DrillQuest 3.03.05.005
Halliburton Sperry-Sun
Survey Report for PBU_ WOA S Pad - S-102L 1PB1
Your Ref: API 500292297271
Job No. AKZZ0002737220, Surveyed: 30 October, 2003
BPXA
North Slope Alaska
Measured Sub-Sea Vertical Local Coordinates Global Coordinates Dogleg Vertical
Depth Incl. Azim. Depth Depth Northings Eastings Northings Eastings Rate Section Comment
(ft) (ft) (It) (It) (ft) (ft) (It) (0/100ft)
13724.40 93.740 12.540 6739.09 6803.29 8441 .64 N 6365.32 W 5988994.66 N 612431.43 E 16.234 6933.75
13748.48 93.300 14.440 6737.61 6801.81 8465.01 N 6359.71 W 5989018.11 N 612436.66 E 8.085 6957.78
13780.53 92.440 16.680 6736.00 6800.20 8495.85 N 6351.12W 5989049.08 N 612444.76 E 7.478 6989.72
13809.43 93.470 19.350 6734.51 6798.71 8523.29 N 6342.20 W 5989076.66 N 612453.25 E 9.891 7018.42
13843.84 92.870 23.020 6732.61 6796.81 8555.32 N 6329.78 W 5989108.88 N 612465.15 E 10.791 7052.33 .
13876.13 89.510 26.070 6731.94 6796.14 8584.68 N 6316.38 W 5989138.45 N 612478.09 E 14.051 7083.84
13909.02 89.170 27.250 6732.32 6796.52 8614.07 N 6301.62 W 5989168.07 N 612492.38 E 3.733 7115.65
13949.28 89.720 29.770 6732.71 6796.91 8649.44 N 6282.41 W 5989203.75 N 612511.03 E 6.406 7154.25
13996.88 90.060 37.320 6732.80 6797.00 8689.09 N 6256.12 W 5989243.80 N 612536.68 E 15.877 7198.49
14032.77 89.970 40.360 6732.79 6796.99 8717.04 N 6233.62 W 5989272.11 N 612558.74 E 8.474 7230.51
14069.97 88.550 41.890 6733.27 6797.47 8745.06 N 6209.15 W 5989300.51 N 612582.75 E 5.611 7263.00
14104.97 87.400 47.400 6734.51 6798.71 8769.93 N 6184.58 W 5989325.77 N 612606.93 E 16.072 7292.44
14144.17 85.890 50.820 6736.80 6801.00 8795.55 N 6155.01 W 5989351.85 N 612636.09 E 9.523 7323.64
14188.97 87.380 47.900 6739.43 6803.63 8824.67 N 6121.08 W 5989381.51 N 612669.56 E 7.307 7359.19
14231.83 87.160 45.610 6741.47 6805.67 8854.00 N 6089.89 W 5989411.33 N 612700.27 E 5.362 7394.36
14277.77 88.210 42.450 6743.33 6807.53 8887.00 N 6057.99 W 5989444.83 N 612731.64 E 7.243 7433.27
14321.64 86.760 37.920 6745.26 6809.46 8920.47 N 6029.72 W 5989478.75 N 612759.38 E 10.832 7471.89
14365.41 85.170 32.380 6748.34 6812.54 8956.15 N 6004.59 W 5989514.83 N 612783.94 E 13.137 7512.02
14434.00 85.170 32.380 6754.11 6818.31 9013.87 N 5967.99 W 5989573.12 N 612819.62 E 0.000 7576.08 Projected Survey
All data is in Feet (US Survey) unless otherwise stated. Directions and coordinates are relative to True North.
Vertical depths are relative to S-102. Northings and Eastings are relative to S-102. .
Global Northings and Eastings are relative to NAD27 Alaska State Planes, Zone 4.
The Dogleg Severity is in Degrees per 100 feet (US Survey).
Vertical Section is from S-102 and calculated along an Azimuth of 12.000° (True).
Magnetic Declination at Surface is 25.353° (25-0ct-03)
Based upon Minimum Curvature type calculations, at a Measured Depth of 14434.00ft.,
The Bottom Hole Displacement is 10810.50ft., in the Direction of 326.492° (True).
21 November, 2003 - 16:48
Page 3 of 4
DrillQuest 3.03.05.005
Halliburton Sperry-Sun
Survey Report for PBU_WOA S Pad - S-102L1PB1
Your Ref: API 500292297271
Job No. AKZZ0002737220, Surveyed: 30 October, 2003
BPXA
North Slope Alaska
Comments
Measured
Depth
(ft)
Station Coordinates
TVD Northings Eastings
(ft) (ft) (ft)
Comment
12777.19
12825.00
6749.01
6748.40
7635.84 N
7673.31 N
5936.41 W Tie On Point
5966.11 W Window Point
.
14434.00
6818.31
9013.87 N
5967.99 W Projected Survey
Survey tool program for S-102L 1 PB 1
From
Measured Vertical
Depth Depth
(ft) (ft)
To
Measured Vertical
Depth Depth Survey Tool Description
(ft) (ft)
0.00
12777.19
0.00 12777.19
6749.01 14434.00
6749.01 BP High Accuracy Gyro - AK-1 BP _HG (S-102PB1)
6818.31 AK-6 BP _IFR-AK (S-102L 1 PB1)
.
21 November, 2003 - 16:48
Page 4 of 4
DrillQuest 3.03.05.005
.
AOGCC
Howard Okland
333 W. 7th Ave. Suite 100
Anchorage, AK 99501
.
~03-150
24-Nov-03
Re: Distribution of Survey Data for Well S-102 L 1 PB1 MWD
Dear Dear Sir/Madam:
Enclosed are two survey hard copies.
Tie-on Survey:
Window / Kickoff Survey:
Projected Survey:
12,777.19' MD
12,825.00' MD
14,434.00' MD
(if applicable)
Please call me at 273-3545 if you have any questions or concerns.
Regards,
William T. Allen
Survey Manager
Attachment(s)
.~ ~"','"~,\\~
RECEIVED
DEC 082003
Alaska 011 & Gas Cons. commie8ion
Andtorage
Halliburton Sperry-Sun
North Slope Alaska
BPXA
PBU_ WOA S Pad
S-102L1 PB1 MWD
.
Job No. AKMW0002737220, Surveyed: 30 October, 2003
Survey Report
21 November, 2003
Your Ref: API 500292297271
Surface Coordinates: 5980655.13 N, 618929.96 E (70021' 20.8844" N, 149002' 02.9105" W)
Grid Coordinate System: NAD27 Alaska State Planes, Zone 4
.
Surface Coordinates relative to Project H Reference: 980655.13 N, 118929.96 E (Grid)
Surface Coordinates relative to Structure Reference: 217.17 S, 1009.92 E (True)
Kelly Bushing Elevation: 64.20ft above Mean Sea Level
Kelly Bushing Elevation: 64.20ft above Project V Reference
Kelly Bushing Elevation: 64.20ft above Structure Reference
S¡""'t=1 II""':Y-SUï!
DAILL'í'ÑG SEAVlc:es
A Halliburton Company
Survey Ref: svy4120
Halliburton Sperry-Sun
Survey Report for PSU_ WOA S Pad - S-102L 1 PS1 MWD
Your Ref: API 500292297271
Job No. AKMW0002737220, Surveyed: 30 October, 2003
SPXA
North Slope Alaska
Measured Sub-Sea Vertical Local Coordinates Global Coordinates Dogleg Vertical
Depth Incl. Azim. Depth Depth Northings Eastings Northings Eastings Rate Section Comment
(ft) (ft) (ft) (ft) (ft) (ft) (ft) (o/100ft)
12777.19 90.920 321.690 6684.81 6749.01 7635.84 N 5936.41 W 5988195.77 N 612873.07 E 6234.73 Tie On Point
MWD Magnetic
12800.00 90.740 321.600 6684.48 6748.68 7653.73 N 5950.56 W 5988213.43 N 612858.64 E 0.882 6249.29
12825.00 90.540 321.510 6684.20 6748.40 7673.31 N 5966.11 W 5988232.76 N 612842.79 E 0.877 6265.21 Window Point
12857.25 82.470 316.630 6686.17 6750.37 7697.61 N 5987.17 W 5988256.71 N 612821.34 E 29.222 6284.59 .
12889.73 73.920 319.100 6692.80 6757.00 7721.15 N 6008.48 W 5988279.92 N 612799.65 E 27.354 6303.19
12919.79 67.140 325.790 6702.83 6767.03 7743.57 N 6025.76 W 5988302.06 N 612782.02 E 30.794 6321.53
12940.94 63.990 324.960 6711.58 6775.78 7759.41 N 6036.70 W 5988317.73 N 612770.83 E 15.316 6334.75
12971 .66 70.170 321.920 6723.54 6787.74 7782.12 N 6053.56 W 5988340.16 N 612753.62 E 22.083 6353.45
13003.20 79.150 320.510 6731.87 6796.07 7805.80 N 6072.60 W 5988363.53 N 612734.20 E 28.796 6372.66
13032.39 79.530 324.740 6737.27 6801.47 7828.59 N 6090.01 W 5988386.05 N 612716.44 E 14.300 6391.33
13063.57 82.560 323.500 6742.13 6806.33 7853.54 N 6108.06 W 5988410.71 N 612697.99 E 10.482 6411.98
13094.24 85.420 324.740 6745.34 6809.54 7878.25 N 6125.93 W 5988435.13 N 612679.73 E 10.155 6432.44
13128.89 89.070 323.680 6747.00 6811.20 7906.32 N 6146.17 W 5988462.88 N 612659.05 E 10.968 6455.69
13160.09 90.350 326.500 6747.16 6811.36 7931.90 N 6164.02 W 5988488.17 N 612640.79 E 9.926 6477.00
13189.80 89.950 330.900 6747.08 6811.28 7957.28 N 6179.45 W 5988513.30 N 612624.96 E 14.871 6498.61
13220.33 91.880 335.310 6746.60 6810.80 7984.50 N 6193.26 W 5988540.30 N 612610.72 E 15.765 6522.37
13253.15 91.570 338.660 6745.61 6809.81 8014.69 N 6206.08 W 5988570.28 N 612597.42 E 10.246 6549.23
13287.88 91.370 334.780 6744.72 6808.92 8046.57 N 6219.80 W 5988601.94 N 612583.20 E 11.183 6577.57
13319.19 90.460 330.730 6744.22 6808.42 8074.40 N 6234.13 W 5988629.54 N 612568.43 E 13.256 6601.80
13354.22 90.470 326.150 6743.93 6808.13 8104.24 N 6252.46 W 5988659.08 N 612549.63 E 13.074 6627.18
13385.09 91.180 325.790 6743.49 6807.69 8129.82 N 6269.73 W 5988684.39 N 612531.95 E 2.579 6648.61 .
13415.49 89.040 325.090 6743.43 6807.63 8154.85 N 6286.97 W 5988709.14 N 612514.31 E 7.406 6669.51
13447.75 90.800 323.150 6743.47 6807.67 8180.99 N 6305.88 W 5988734.98 N 612495.00 E 8.119 6691.15
13484.27 89.940 326.850 6743.24 6807.44 8210.90 N 6326.82 W 5988764.55 N 612473.58 E 10.401 6716.05
13521.67 89.460 335.310 6743.43 6807.63 8243.60 N 6344.89 W 5988796.96 N 612454.99 E 22.656 6744.28
13559.65 91 .070 342.360 6743.26 6807.46 8279.00 N 6358.60 W 5988832.14 N 612440.73 E 19.039 6776.06
13589.40 88.860 349.230 6743.28 6807.48 8307.82 N 6365.89 W 5988860.84 N 612432.98 E 24.257 6802.73
13619.92 88.500 354.870 6743.98 6808.18 8338.03 N 6370.11 W 5988890.97 N 612428.28 E 18.512 6831 .40
13652.98 94.360 359.450 6743.16 6807.36 8371.01 N 6371.75 W 5988923.93 N 612426.12 E 22.491 6863.32
13682.44 92.510 5.590 6741.39 6805.59 8400.37 N 6370.45 W 5988953.31 N 612426.95 E 21.731 6892.31
21 November, 2003 - 16:46
Page 2 of 4
DrillQuest 3.03.05.005
Halliburton Sperry-Sun
Survey Report for PBU_ WOA S Pad - S-102L 1 PB1 MWD
Your Ref: API 500292297271
Job No. AKMW0002737220, Surveyed: 30 October, 2003
BPXA
North Slope Alaska
Measured Sub-Sea Vertical Local Coordinates Global Coordinates Dogleg Vertical
Depth Incl. Azim. Depth Depth Northings Eastings Northings Eastings Rate Section Comment
(ft) (ft) (ft) (ft) (ft) (ft) (ft) (0/100ft)
13724.40 93.740 11 .800 6739.10 6803.30 8441 .77 N 6364.12 W 5988994.80 N 612432.62 E 15.065 6934.12
13748.48 93.300 13.410 6737.62 6801.82 8465.22 N 6358.88 W 5989018.33 N 612437.49 E 6.919 6958.15
13780.53 92.440 15.020 6736.02 6800.22 8496.25 N 6351.02 W 5989049.48 N 612444.86 E 5.690 6990.14
13809.43 93.470 18.540 6734.53 6798.73 8523.88 N 6342.69 W 5989077.24 N 612452.75 E 12.675 7018.89
13843.84 92.870 19.240 6732.62 6796.82 8556.39 N 6331.57 W 5989109.92 N 612463.35 E 2.677 7053.00 .
13876.13 89.510 21.760 6731.95 6796.15 8586.62 N 6320.26 W 5989140.33 N 612474.18 E 13.005 7084.92
13909.02 89.170 25.480 6732.33 6796.53 8616.75 N 6307.09 W 5989170.66 N 612486.87 E 11.357 7117.13
13949.28 89.720 28.620 6732.72 6796.92 8652.60 N 6288.78 W 5989206.80 N 612504.60 E 7.918 7156.00
13996.88 90.060 35.090 6732.81 6797.01 8693.00 N 6263.67 W 5989247.60 N 612529.07 E 13.611 7200.75
14032.77 89.970 39.040 6732.80 6797.00 8721.64 N 6242.05 W 5989276.57 N 612550.24 E 11.009 7233.25
14069.97 88.550 41 .880 6733.28 6797.48 8749.94 N 6217.91 W 5989305.25 N 612573.92 E 8.535 7265.95
14104.97 87.400 48.140 6734.52 6798.72 8774.65 N 6193.19 W 5989330.35 N 612598.25 E 18.174 7295.27
14144.17 85.890 51.980 6736.82 6801.02 8799.77 N 6163.19 W 5989355.95 N 612627.84 E 10.510 7326.07
14188.97 87.380 48.770 6739.45 6803.65 8828.29 N 6128.75 W 5989385.01 N 612661.83 E 7.888 7361.13
14231.83 87.160 46.560 6741.49 6805.69 8857.12 N 6097.10 W 5989414.34 N 612693.01 E 5.176 7395.91
14277. 77 88.210 42.450 6743.34 6807.54 8889.85 N 6064.94 W 5989447.57 N 612724.66 E 9.227 7434.61
14321.64 86.760 39.020 6745.27 6809.47 8923.05 N 6036.34 W 5989481.23 N 612752.72 E 8.481 7473.04
14365.41 85.170 32.970 6748.35 6812.55 8958.36 N 6010.69 W 5989516.93 N 612777.81 E 14.258 7512.90
14434.00 85.170 32.970 6754.13 6818.33 9015.70 N 5973.50 W 5989574.86 N 612814.09 E 0.000 7576.72 Projected Survey
All data is in Feet (US Survey) unless otherwise stated. Directions and coordinates are relative to True North.
Vertical depths are relative to 5-102. Northings and Eastings are relative to S-102. .
Global Northings and Eastings are relative to NAD27 Alaska State Planes, Zone 4.
The Dogleg Severity is in Degrees per 100 feet (US Survey).
Vertical Section is from S-102 and calculated along an Azimuth of 12.000° (True).
Magnetic Declination at Surface is 25.354° (24-0ct-03)
Based upon Minimum Curvature type calculations, at a Measured Depth of 14434.00ft.,
The Bottom Hole Displacement is 10815.06ft., in the Direction of 326.473° (True).
21 November, 2003 - 16:46
Page 3 of 4
DrillQuest 3.03.05.005
Halliburton Sperry-Sun
Survey Report for PSU_WOA S Pad - S-102L1 PS1 MWD
Your Ref: API 500292297271
Job No. AKMW0002737220, Surveyed: 30 October, 2003
SPXA
North Slope Alaska
Comments
Measured
Depth
(ft)
Station Coordinates
TVD Northings Eastings
(ft) (ft) (ft)
Comment
12777.19
12825.00
6749.01
6748.40
7635.84 N
7673.31 N
5936.41 W Tie On Point
5966.11 W Window Point
.
14434.00
6818.33
9015.70 N
5973.50 W Projected Survey
Survey tool program for S-102L 1 PB1 MWD
Fro m
Measured Vertical
Depth Depth
(ft) (ft)
To
Measured Vertical
Depth Depth Survey Tool Description
(ft) (ft)
0.00
12777.19
0.00 12777.19
6749.01 14434.00
6749.01 BP High Accuracy Gyro - AK-1 BP _HG (S-102PB1)
6818.33 MWD Magnetic (S-1 02L 1 PB1 MWD)
.
21 November, 2003 - 16:46
Page 4 of 4
DrillQuest 3.03.05.005
.
.
,·1['·' ..
Date: 12-01-2003
Transmittal Number: 92631A
BPXA WELL DATA TRANSMITTAL
Enclosed are the materials listed below. If you have any questions, please contact me in
the PDC at 564-4091.
Top Bottom
SW Name Date Contractor Log Run Depth Depth Log Type
S-102L 1 11-02-2003 REEVES 1 11500 14377 CML MEASURED DEPTH ARRAY
INDUCTION SHALLOW
FOCUSSED LOG;
11-02-2003 REEVES 1 11500 14334 CML MEASURED DEPTH PHOTO
DENSITY DUAL SPACED
NEUTRON LOG;
S-1 02L 1 11-02-2003 REEVES 1 11500 14356 CML MEASURED DEPTH
COMPENSATED SONIC LOG;
S-1 02L 1 11-02-2003 REEVES 1 6674 6684 CML TVD ARRAY INDUCTION
SHALLOW FOCUSSED LOG
S-1 02L 1 11-02-2003 REEVES 1 6674 6684 CML TVD COMPENSATED
SONIC LOG;
-1 02L 1 11-02-2003 REEVES 1 6674 6684 CML TVD PHOTO DENSITY
DUAL SPACED NEUTRON LOG;
8°1-05,\ V-100 11-09-2003 SCH 1 0 7980 LEAK DETECTION LOG;
.5 -/~5U../ /Pee yeS ¿,vl/'e /I.If e 5er I/I~eS7 eÞ:J /f'¿7P?/ (!)l¡- ~C7V - ô -øJæ01-
..,
~..>~...,.",) " ~';.^~"...
~lu ,Ý\..., ,'>') '-C ~ ~ d'~
Please Sign and Return one copy of this transmittal.
Thank You,
James H. Johnson
Petrotechnical Data Center
Attn: Howard Oakland (DNR)
Attn: Kristin Dirks (DNR)
Attn: Sandy Lemke (ConocoPhillips)
Attn: Phillip Thibodeaux Jf. (Exxon Mobil Production Co.)
R ErE'
DEC ~200j
Alasf(a úìì ð. vi.o"
AnChorage
Petrotechnical Data Center LR2-1
900 E. Benson Blvd. PO Box 196612
Anchorage, AK 99519-6612
TREE = 4-1/16" - 5M CrN CHROME
WELLHEAD = 13-5/8" - 5M FMC SH
...
5-102 L 1
ACTUATOR =
KB. ELEV =
BF. ELÊV~;~·~ .
KOP=
Max Angle =
Datum MD =
------~~---
Datum TVD =
BAKER
64.2'
-
SAFEÌ. ,'\IOTES: CAUTION: 2 SCHLUMBERGER
RADIOACTIVE SOURCES P&A'd 10/04/00 WI RED
CMT TO PB 8017' MD /4655' TVD. 1) 8564' MD/4882'
TVD-2.0 CURlECS-137. 2) 8531' MD/4867' TVD-4.0
CURIE AM - 241 ** DO NOT REENTER WELL BELOW
PB DEPTH BEFORE CONTACTING U.S. NUCLEAR
REGULATORY COMMISSION & AK DEPT OF O&G **
(FROM: CTD Sidetrack-DRAFT)
1400'
93° @ 12,497'
12749'
6700' SS
-
-
110-3/4" CSG, 45.5#, K-55-BTC, ID = 9.95" H 4816'
~
Minimum ID = 3.75" @ 12264' I
HALLIBURTON ES CEMENTER
-
z
~
.
14-1/2" IBT LNR, 12.6#, L-80, ID = 3.958" I
14-112" TBG, 12.6#, L-80 BTC-M, ID= 3.958" H 11558'
.
I I
17" CSG, 29#, L-80-BTC-M, ID = 6.182" H 11717'
..
TOP OF 4-1/2" SLTD LNR H 12312' I
~
PERFORATION SUMMARY
REF LOG: PDS JEWELRY LOG ON 12/11/00
ANGLE AT TOP PERF: 73° @ 11680'
Note: Refer to Production DB for historical perf data
SIZE SPF INTERVAL Opn/Sqz
3-318" 6 11680 - 11700 0
3-318" 6 11716 - 11736 0
DATE
01/21/01
01/21/01
IBOTTOMOF4-1/2"SLìDLNR/-i 13100' t
PBTD -{ 13100'
~-f 13488'
·
= ----i
1
H 7" PORT COLLA R I
H4-1/2" X LANDING NIP, ID = 3.813" I
GAS LIFT MANDRELS
DEV TYPE VLV LATCH PORT DATE
66 KBG-2-LS DOME INT 16
52 KBG-2-LS DOME INT 16
53 KBG-2-LS DMY INT 0
64 KBG-2-LS SO INT 24 06/10/03
2185'
2515'
~
L
ST MD TVD
4 5783 3722
3 9818 5914
2 11161 6521
1 11395 6648
-
6992' H7" PORT COLLAR I
· 11503' H4-1/2" X LANDING NIP, ID = 3.813" I
:8: 11524' \- 7" X 4-1/2" BAKER S-3 PKR, ID = 3.875" I
't5: 11543' - BAKER 5" X 7" LNR TOP PKR I
II W/LlNER TIE-BACK SLEEVE
· I~ 11547' \- 4-' n" X LA""'" NIP, ID' 3.813" I
11557' - BAKER 5" X 7" HMC HYDRAULIC
LNR HGR, ID = 3.938"
Ú 1 11558' H4-1/2" WLEG I
1 11553' HELMD TT LOGGED 12/12/00
~
12264'
11 HALLIBURTON ES TYÆ H CEMENTER
- MILLED TO 3.80" DURING PRE-RIG WORK
H 4-1/2" X 6-3/4" ECP, ID = 3.875" I
5<1
12267'
Proposed CTD Sidetrack liner
yITOPOF3-3/16"LNR H 12738' I
rìl
I
I
I 13272' H3-3/16 x 2-7/8 X-over
I
I
00000000
I
14968'
I
I
'\J 3-3/16" X 2-7/8" slotted liner l-i
'I 12827' 1-fiv1echanical Whipstock
DATE REV BY COMMENTS DATE REV BY COMMENTS AURORA UNIT
7/4/1982 ORIGINAL COM PLETION 04/09/03 DRSITP TV D/MD CORRECTIONS WELL: S-102
1 0/06/91 DSMC LAST WORK OVER 06/10/03 MHITLH GLV C/O ÆRMIT No: 1820950
10/24/00 LAST COM PLETION 11/05/03 SK CTD sidetrack API No: 50-029-22972-00
03/12/01 SIS-MD FINAL SEC 35, T12N, R12E
03/16/01 CHlTP CORRECTIONS
06/03/01 CH/KAK GLM CORRECTION BP Exploration (Alaska)
· .
(ill} !Æ ~!Æ ~ ~~!Æ / FRANK H. MURKOWSKI, GOVERNOR
/
AI,~t¡KA. OIL AND GAS /
CONSERVATION COMMISSION !
333 W. 7'" AVENUE, SUITE 100
ANCHORAGE, ALASKA 99501-3539
PHONE (907) 279-1433
FAX (907) 276-7542
Mark Johnson
CT Drilling Engineer
BP Exploration (Alaska), Inc.
PO Box 196612
Anchorage AK 99519
Re: Prudhoe Bay Unit S-102Ll
BP Exploration (Alaska), Inc.
Permit No: 203-156
Surface Location: 4452' NSL, 4499' WEL, Sec. 35, T12N, RI2E, UM
Bottomhole Location: 3903' NSL, 4654' WEL, Sec. 22, TI2N, RI2E, UM
Dear Mr. Johnson,
Enclosed is the approved application for permit to redrill the above development well.
This permit to redrill does not exempt you from obtaining additional permits or approvals
required by law from other governmental agencies, and does not authorize conducting drilling
operations until all other required permits and approvals have been issued. In addition, the
Commission reserves the right to withdraw the permit in the event it was erroneously issued.
Operations must be conducted in accordance with AS 31.05 and Title 20, Chapter 25 of the
Alaska Administrative Code unless the Commission specifically authorizes a variance. Failure
to comply with an applicable provision of AS 31.05, Title 20, Chapter 25 of the Alaska
Administrative Code, or a Commission order, or the terms and conditions of this permit may
result in the revocation or suspension of the permit. Please provide at least twenty-four (24)
hours notice for a representative of the Commission to witness any required test. Contact the
Commission's North Slope petroleum field inspector at 659-3607 (pager).
Sincerely,
~~tL-~
Randy Ruedrich
Commissioner
BY ORDER OF THE COMMISSION
DATED this---1L day of September, 2003
cc: Department ofFish & Game, Habitat Section w/o encl.
Department of Environmental Conservation w/o encl.
Exploration, Production and Refineries Section
Ì^-/4Æ 'i//o/2.00S
o Drill II Redrill
1 a. Type of work 0 Re-Entry
2. Operator Name:
BP Exploration (Alaska) Inc.
3. Address:
P.O. Box 196612, Anchorage, Alaska 99519-6612
4a. Location of Well (Governmental Section):
Surface:
4452' NSL, 4499' WEL, SEC. 35, T12N, R12E, UM
Top of Productive Horizon:
656' NSL, 4450' WEL, SEC. 22, T12N, R12E, UM
Total Depth:
3903' NSL, 4654' WEL, SEC. 22, T12N, R12E, UM
4b. Location of Well (State Base Plane Coordinates):
Surface: x-618930 y-5980655 Zone-ASP4
16. Deviated Wells:
Kickoff Depth
1!tCasing Program
Size
Hole Casing Weight
3-3/4" 3-3/16" x2-7/B" 6.2#/6.16#
.. STATE OF ALASKA _
ALASKA ðPAND GAS CONSERVATION CO~SION
PERMIT TO DRILL
20 AAC 25"005
11b. Current Well Class 0 Exploratory
o Stratigraphic Test 0 Service
5. Bond: a Blanket 0 Single Well
Bond No. 25100302630-277
6. Proposed Depth:
MD 15575' TVD 6775ss
7. Property Designation:
ADL 028256
II Development Oil 0 Multiple Zone
o Development Gas 0 Single Zone
11. Well Name and Number:
PBUS-102L1 /'
12. Field 1 Pool(s):
Prudhoe Bay Field 1 Aurora Pool
8. Land Use Permit:
13. Approximate Spud Date:
September 20,2003
14. Distance to Nearest Property:
686'
9. Acres in Property:
2560
12825 ft Maximum Hole Angle 920
Specifications
Grade Coupling Length
L-80 TCII ISTL 2800'
10. KB Elevation KBE = 15. Distance to.Neare~t Well Within PO?I/
(Height above GL): 64.2 feet 5-111 IS 650 away at 15360
17. Anticipated pressure (see 20 MC 25.035) /
Max. Downhole Pressure: 3000 psig. Max. Surface Pressure: 2327 psig
Setting Depth Quantity of Cement
Top Bottom (c.f. or sacks)
MD TVD MD --~D_ ..4igQÜg.s4lg~. dq!a)
12775' 6701' /15~ 6775 Un41,J,g~=.~!Ja·.~ ./
S[P 0 5 1'003
~ asks UiJ & Gas Cons. Cnmm.>r
19. PRESENT WELL CONDITION SUMMARY (To be completed for Redrill AND Re-entry OperJ\.JtJtø
Total Depth MD (ft): Total Depth TVD (ft): Plugs (measured): Effective Depth MD (ft): Depth TVD Junk (measured):
13488 6787 None 13100 6749 NIA
Structural
Conductor 80' 20" 260 sx Arctic Set (Approx.) 109' 109'
Surface 4789' 10-3/4" 643 sx AS Lite III. 510 sx Class 'G', Top Job: 150 sx AS Lite 4816' 3314'
Intermediate
Production 11693' 7" 627 sx Class 'G' 11717' 6763'
Liner 1557' 4-1/2" 57 sx Class 'G' 11543' - 13100' 6708' - 6749'
20. Attachments a Filing Fee a BOP Sketch
o Property Plat 0 Diverter Sketch
perfOration Depth TVD (ft): 6752' - 6749'
a Drilling Program 0 Time vs Depth Plot 0 Shallow Hazard Analysis
o Seabed Report a Drilling Fluid Program a 20 MC 25.050 Requirements
Date:
Perforation Depth MD (ft): 11680' -13099'
21. Verbal Approval: Commission Representative:
22. I hereby certify that the foregoing is true and correct to the best of my knowledge.
Printed Name Mark Johnson Title CT Drilling Engineer
Signature .~ O· Phone 564-5666
Commission Use Only
I Permit APproval1j
Date: ~/ Ij l>~
D Yes ~ No Mud Log Requir
~ Yes D No Directional Survey Required
Contact Mark Johnson, 564-5666
Date
9/t¡/c-S
Prepared By Name/Number:
Terrie Hubble, 564-4628
Permit To Drill I A Number: /
Number:.2a3 -/Sb" 50-029-22972-60
Conditions of Approval: Samples Required
Hydrogen Sulfide Measures
Other: T~<;t- ¡of E to ~s-oo f~¡'
I See cover letter for
other requirements
DYes ~No
~Yes D No
Approved By: ß.-;L¡ ~ v/L Cp~~Iî"IONER
Form 10-401 Revised 3/2003 0 RIG 11\1 A ,
BY ORDER OF
THE COMMISSION
Date
9//I/P3
Submit In Duplicate
e
e
BP
S-102 Ll Sidetrack
Summary of Operations: /
Well S-102 is scheduled for a through tubing sidetrack with the SLB/Nordic 1 Coiled Tubing Drilling rig on
9/20/03. This lateral addition, S-102 Ll, will exit~the existing 4 'lÇ' slotted liner at 12825' md from a
whipstock and target the Kuparuk C sands. The existing production from the parent wellbore slotted liner and
perfs will be retained. The following describes the planned sidetrack. A schematic diagram of the proposed
sidetrack is attached for reference.
Pre CTD Summary (phase 1)
1) Slickline -Drift tubing. Dummy gas lift valves. Pressure test IA to 3000 psi.
2) CT - Cleanout liner to TD. Spot and squeeze CaC03 pill into fractured perforations (11680-11736')
to reduce mud losses while drilling. Drift for whipstock. Set whipstock at 12825'.
CTD Sidetrack Summary (phase 2)
1) MIRV CTD rig.
2) Mill 3.80" OD window off of 4 Yz" LSX whipstock at 12825' md.
3) Drill 3.75" openhole sidetrack lateral to -15575' TD with MWD/gamma ray. /
4) Run 33/16" x 27/8" slotted liner completion in new lateral leg. /'
5) RDMO.
Post CTD Summary (phase 3)
1) CT - spot acid over existing perforations to remove CaC03 pill and restore production.
Mud Program:
. Phase 1: 8.; y~water
· Phase 2: 8.~g used Flo Pro or biozan for milling, new Flo Pro for drilling.
Disposal:
· All drilling and completion fluids and all other Class II wastes will go to Grind & Inject.
· All Class I wastes will go to Pad 3 for disposal.
Casing Program:
. A 3 3/16"x 2 7/8" pre drilled liner completion will be run from 12775' to TD at 15575' md. The crossover ./
from 33/16" to 2 7/8" will be placed at -13200' md.
Well Control:
· BOP diagram is attached.
· Pipe rams, blind rams and the CT pack off will be pressure tested to 400 psi and to 3500 psi. /"'
· The annular preventer will be tested to 400 psi and 2500 psi.
Directional
· See attached directional plan. Max. planned hole angle is 92 deg.
· Magnetic and inclination surveys will be taken every 30 ft. No gyro will be run.
Logging
· MWD directional and Gamma Ray will be run over all of the open hole section.
· Resistivity and sonic logging are optional.
e
e
Hazards /
· Aurora S pad is not an H2S pad. Maximum recorded IDS on the pad was 40 ppm from S-14i. S-102 H2S
was measured at <10 ppm. All IDS monitoring equipment will be operational.
· One fault crossing is anticipated at 13160' md with an expected throw of 50'. Lost circulation risk is
considered "medium" so LCM material will be on location as a contingency. ,;//
· Rotary drilling co 0 (2) radioactive sources (stuck BRA) with a red cement plug back on 10/4/00. The
sources are at 800' . There will be no impact to CID sidetrack operations because the CID KOP is .,/"
>3600' vertic ction and > 1800' TVD distant from the sources and also isolated by 7" casing and 4 W'
production tubing. Please see attached drawing. Notification to the NRC is not required due to the separation
stated above.
Reservoir Pressure
· Res. press. is estimated to be 3000 psi at 6730'ss (8.6 ppg EMW). Max. surface pressure with gas (0.10 psi/ft)
to surface is 2327 psi. ~
Distance to nearest property
· S-102 Ll is 686' from the PBU unit boundary line at ID of 15575' md.
Distance to nearest well within pool /
· S-111 is 650' away at 15360' md in the S-102 Ll directional plan.
Casin2lLiner Information
10-3/4", k-55, 45.5#, Burst 3580 psi; collapse 2090 psi
7", L-80, 29#, Burst 8160 psi; collapse 7020 psi /'
4}'2" L-80 BTC-M, 12.6#, Burst 8440 psi; collapse 7500 psi
33/16" L-80 TCII, 6.2#, Burst 8520 psi; collapse 7660 psi (connection same as body rating)
27/8" L-80 STL 6.16#, Burst 10570 psi; collapse 11170 psi (connection same as body rating)
MOJ
9/3/03
T~= 4-1/16"-5MCIWCI-ROME e
Wa.LI"EAD =13:-5/8" ~ 5M FMC~. I-i - S 1 0 2 /'
ACTUATOR = SA .I '\ -
.~:: ~ = .......... ......~...:.~..... 64.~ EX' 5T IN f7 J
~~,,::= ............."............ .........~~,,?'- - -" AA
Max Angle = 93° @ 12,497'
Ï5äiüiñr\II¡j',;;...· .. . . ..........12749'
i5äiü·riïivö..,;;..·..·· ....... "'67ÖÖ'''SS
110-314" COO, 45.5#, K-55-BTC,1D = 9.95" H 4816' ~
Minimum ID = 3.75" @ 12264'
HALLBURTON ES CEMENTER
PERFORATION SUMMARY
REF LOG: PDS JEWELRY LOG ON 12/11/00
ANGlE ATTCP PffiF: 73' @11600'
Note: Refer to Production DB b" historical perf data
SIZE SPF INTERVAL.. Op1/Sqz
3-318" 6 11680 - 11700 0
3-318" 6 11716 - 11736 0
DATE
01/21/01
01/21101
4-1/2"T8G,12.6#, L-80BTC-M, Ð= 3.958" H 11558' I
17" CSG, 29#, L-80-BTC-M, Ð= 6.182" H 11717' I
14-1/2" BT Lf'R, 12.6#, L-80, Ð = 3.958" I
Imp OF 4-1/2" SL 10 LNR H 12312' I
I BOTTOM OF 4-1/2" SL 10 LNRH 13100'
I PBmH 13100'
[§]; 13488'
[)II.1E
71411982
10106191
10124.00
03l12AJ1
03l16K11
06I03AJ1
RBI BY COMMENlS
OAGINAL COMPLErION
DSMC LAST WORK OVER
LAST COM PLEnON
SIS-tvO FN\L
a-tIlP CORRELllONS
CH'KAK GLM OOffiECTION
::::;)
(1) ~
ST
L 4
3
2
1
-
(Ð
:8: :8:
8' ~
m ~
.
-
m
if
-a f/A¿.¿¡/JcJ/'2.røN
S~ NOTES: CAUTION: 2 901ILW"[~"R
RADIOACTIVE SOURCES P&A'd 10/04/00 WI RED
CMT TO PB 8017' MD/4655'TVD. 1) 8564' MDi488.
1VD-2.D CURIE CS-137. 2) 8531' MD/4867'1VD-4.o
CURIE AM - 241 ** DO NOT REENTER Wa.L BELOW
PB DEPTH BB=ORE CONTACTING U.S. NUCLEAR
REGULATORY COMMISSION & AK DEPT OFO&G-
2185' H7" PORTCŒ.LAR
2515' H4-1/Z' X LANDNGNP, Ð= 3.813" I
GAS LFT MAN[RB..S
tv[) TVD DEV TYPE VLV LATCH FORT DAl
5783 3722 66 KBG-2-LS DO~ M 16
9818 5914 52 KBG-2-LS DO~ M 16
11161 6521 53 KBG-2-LS DMY M 0
11395 6648 64 KBG-2-LS SO M 24 06'10
6992' H7" FORI' OOLLAR
11503' H4-1/2" XLANDNG NP, Ð= 3.813"1
11524' H7" X 4-1/2" BAKERS-3 A<R, Ð = 3.875"
11543' J-iBAKER 5" X 7" LNR TCP PKR I
IWILIf'£R llE-BACK SLEEVE
1154T H4-1/2" XLANDlNGNP, Ð= 3.813" I
11557' HBAKER 5" X 7" !-Me HYDRAUUC I
ILtR HGR, ID= 3.938"
11558' 1-14-1/2" WlB3
11553' HB..tvO TT LOGGED 12/12/00
12264' HHALLOORl'ONESTYPEHŒMENTER
1* MLLED 10 3-3/4" OJRNG COfvRETlON
l 12267' H4-1/2" X 6-314" ECP, D =3.875" I
DATE ÆV BY COMM:NTS
04/09103 [RS/TP TVD,MD COffiECTONS
06/1 (}I03 Mi/lLH Gl V C/O
...
to.
~
5<1
.____......m...~
A LRORA UNIT
WB..L: S-102
PERMT f\b: 1820950
API f\b: 50-029-22972-00
sa:: 35, T12N. R12E
BP Exploration (Alaska)
TREE =' 4-1/16" - SM CaN CHROME
\l\lELLHEAD = 13-S/8" - SM FMC SH
~_.·.".~...._.~~"",~~__.~·~·...___~_~·~.·.·.,__._._r__.·..............._._____.._._...~..~..'.
ACTUA TOR = BAKER
.r.r~.___.~'.._._-__i..·..._.__....._.__....._.·...·....-....._.n...
KB. B..EV = 64.2'
·äF~ËiË\T;..............··...·...·..·..........·....
ï<Öp·;;...........····..·....·.............·....1·¡¡Ö¡ÿ·
·Mä;ë;Ö;ngië..,;;..··..·..·....93ò··@·1·2:49T
ï)1'tüiiïijo·;;..·..... .................... '1'2749;'
ïSätliiTïiVõ;;;·........·..........··Š700·SS
e
\10-3/4" CSG, 4S.5#, K-S5-BTC, 10 = 9.9S" H 4816'
Minimum ID = 3.75" @ 12264'
HALLIBURTON ES CEMENTER
5-102 L 1
HALLIGoJR.,ToN
SA~TES: CAUTION: 2 a8::~"r1:r1!ll("r:
RADI VESOURCES P&A'd 10/04/00 WI RED
CMTTO B8017' MD/4655' TVD. 1)8564' MDI4882'
TVD-2.0 CURIE CS-137. 2) 8531' MDl4867' TVD4.0
CURIE AM - 241 ** DO NOT REENTER W8..L B8..0W
PB DEPTH BEFORE CONTACTING U.S. NUCLEAR
REGULATORY COMMISSION & AK DEPT OFO&G**
Proposed CTD Sidetrack
-
-
=--1
I
H7" FORT COLLAR I
1-i4-1 12" X LANDING NIP, 10=3.813" I
GAS LIFT MANDRELS
DEV TYPE VLV LATCH FORT DATE
66 KBG-2-LS DOME INT 16
S2 KBG-2-LS DOME INT 16
53 KBG-2-LS DMY INT 0
64 KBG-2-LS SO INT 24 06/10/03
1-\7" FORT COLLAR I
2185'
2515'
~
A
VI
~
L
ST MD lVD
-
4 S783 3722
3 9818 5914
2 11161 6521
1 11395 6648
- 6992'
-
-
-
e 11503' 1-\4-1/2" x LANDING NIP, 10 = 3.813" I
:8: :8 11524' ~ 7" x 4-112" BAKER 8-3 PKR, ID = 3.87S" I
~ '){ 11543' - BAKER 5" X 7" LNR TOP PKR I
m æ WILlNER llE-BACK SLEEVE
[4-1/2" IBT LNR, 12.6#, L-BO, 10= 3.958" I e ~ 11547' 94-'12" x LANDIIG .... D. 3.81" I
11557' BAKER S" X7" HMC HYDRAULIC I
E LNR HGR, ID = 3.938"
14-112" TBG. 12.6#, L-SO BTC-M. ID = 3.958" H 11558' I j o. \ 11558' 1-\ 4-112" IIIILEG I
I 11553' l-i B..MD TT LOGGED 12/12/00
I r CSG, 29#, L-BO-BTC-M, 10 = 6.1S2" H 1171T ..
TOP OF 4-1/2" SLID LNR H 12312' I
PERFORAllONSUMMARY
REF LOG: PDS JEWELRY LOG ON 12/11/00
ANGLE AT TOP PERF: 7~ @11680'
Note: Refer to Production DB for historical perf data
SIZE SPF INTERVAL OpnlSqz
3-3IS" 6 11680-11700 0
3-318" 6 11716 - 11736 0
DATE
01/21/01
01/21/01
IBOTTOMOF4-1/2"SLìD~:I~ ~~~:: r
~- 13488'
DATE
7/411982
10106191
10124/00
03112/01
03116101
06103101
REV BY COMMENTS
ORIGINAL COM PLETION
DSMC LASTWORKOV~
LAST COMPLETION
SIS-MD Ft4A L
CHlTP CORRECTIONS
CHIKAK GLM CORRECTCN
12264'
H HALLIBURTON ES TYPE H CEMENTER
I * MILLED TO 3-3/4" DURING COMA..ETION
H4-1/2" X 6-314" ECP, 10= 3.S7S" I
~
5<1
12267'
Proposed em SIdetrack Iner
~I :::jTOPOF3-3/16" LN~ 12775' I ,/
I 3.S" X Nip 2.80" Ð 12785'
t1:T I 13200' H:>3I1. x 2-7/8 X-~..
... 0 C b 0 0-·0 ç Q
: ........"..:
'n....m......~ I 3-3/16" X 2-7/S" slotted finer H
~ 12825' HMechanìcalWhiPstock
15575'
DATE REV BY COM\1ENTS
04/09/03 DRSITP lV D'MD CORRECllONS
06/10103 MHlTLH GL V C/O
AURORA UNIT
W8...L: S-102
PERMIT No: 1820950
API No: 50-029-22972-00
SEC3S. T12N, R12E
BP Exploration (Alaska)
~. ¡¿AO/oAcTJv£ SOV(¿ce.S
zq -It- cqS1its 5 -/a2- LJ
f IG /1J~.~
-th4r tJbe:,,,clo,,,ed. r~~:qc.h;-e
Qye, fa '("' it Wð '( fyottt C.TD
~/J..t..d,- 1<,."- off r:ì.r (~.P )
4Y\d SofCl.fe{ br .Y'l.". -(v/ølr'lJ
c..$U'5·
-.... ---- .......---.....
/ I
1Z,<JlS GTJ) ~'f
t kOP 3'00
t
e
"
I 'I
, 1',..1.{" ,y~r
\\S1-"t JlI~.'" pt\
~{,p.
, 1f"...,.1'
\\s"~ ~ (jI~~et'"
l-I"e"- }Dr
,
sf
!lot'/
~o¡1 m~
í
¡oF I
<g1t1G. ~",~I
ó ó
z z
w W
IL oJ
CI: -
,... IL
...
W
~
Q
:;)
ID
I
IL
o
I
ó
z
...
w
W
::£:
(/)
3'1~
~
)
e
~
,.:.
g¡
'"
:.:
«
"",-
~"'- ----
...........-- ---.-
/¡11~r
I - d'5f4",f) 0"5 ( c.+f\
5ec·tTOVf . J'¡.Q; , '.I
') l<oP
Lf'Iz- slofltJ
ve"-¡'c~
"
C·3b3
2- ('" l\ cJ., () a.d. .; c
oS!)\) (c-(::5 f.,p",S c.em~~
\!!~ 'oM·o~ /.(1/7. S6/'d.
ce""<...t~¿'
II ",'<r-
I .
1S~1.f M(J. 'ill
^ pfva bt!ck.
~~, 7 ' TV!) dts'Ârl1- )
\'
~
MO:;J 9/t¡ /03
w
~
Q
oJ
>
Q.
Q.
CI:
¡..:
Q.
W
Q
a:
w
w
z
c;
z
w
... z
o 0
W Q
~ W
ID (/)
:;) CI:
(/) ID
=
ill
a
c:J
z
-
œ
au
au
Z
-
c:J
Z
au
c..
.c
_,t.t-.
-~'~',~~
- ~.
.¡.~.~
·~t~-'
Spatial Calculator
....
...
.
.
: Closure Angle
Initial Point 0-
.,... ~....
..,....
'.
'.
Closure Distance ~
'. ~ Final Point
Spatial Calculator
Initial Point
Final Point
Initial Point
Final Point
Displacement (ft)
2-D Closure Angle (deg from True North)
2-D Closure Distance (ft in horizontal plane)
3-D Distance (ft)
Grid Convergence
Surface ASP Coordinates
ASP Y (N/-S) ASP X (E/-W)
5980655.13
618929.96
Coords. - ASP
N(+)/S(-) E(+)/W(-)
Lat. (Y) Dep. (X)
0.90
Subsea
TVD
(ft)
6684.20
4817.15
Coordinates - True
N(+)/S(-) (ft) "". "
7 6?~~,~~",,;
48 tiit90" " "
-28~,~~7:.
14î'.~:t
~ Ve..r ·hü:d
Page 1 of 1 (Spatial Calculator1)
Coords. - TRUE
N(+)/S(-) E(+)/W(-)
Lat. (Y) Dep. (X)
7673.27 -5966.08
4814.90 ·'-3726.82
E(+)/W(-) (ft)
. ",W;:,:;,' ·:.:::::,,:;,.,:~~966.08
·W" ..,;,,;,,:~726.82
.~."" ,,:,:':..;,~239.26
~
<;.,;.. .Ç.....h G~"''''''''
Subsea
!X,~gg
"::,.,,,,,,,,,;oi);;n./Þ d.'~ sr
e~
¿","-,. ~":>+ '
9/4/2003 11 :31 AM
e
'¥-CP
·s -..( c 2-L¡
(2A
~~Ø4....A..f^t.k.
2>'7 f:Ai f'Aþ
',,, ep, I
Page 1 of 1
e
e
Johnson, Mark 0
From: Eric Cribbs [Eric.Cribbs@HALLlBURTON.com]
Sent: Thursday, September 04, 2003 2:50 PM
To: Johnson, Mark 0
Subject: Sidetrack with radioactive fish
Importance: High
Mark,
With the sidetrack on S-102, there does not need to be any notification to any regulatory agencies with the sidetrack
details presented.
The only time the NRC needs to be contacted is if the sidetrack is drilled within 15 ft or less of the fish. A gamma ray
log must also be run to verify source location.
If you need any other information, please give me a call.
Eric Cribbs
MWD Service Coordinator
Alaska Operations
it Telephone: (907) 273-3522 (Direct)
@ Fax: (907) 273-3535
8 Email: eric.cribbs@halliburton.com
: < ~. : . ::
:; , ::
7ooo·-:} ··::H:: ..... '. . ........-:........;...'.....'.. ..................... ".'."'. ~.¡.. ·::LL '.' :......::f···~ ..:-....:.....~. ....... ......:.............'...:....
'.~: .: .:... ..... ......: ...... .:. ....:......~.j... : . . . :: :''': ':. : ':.:"
71 oo·l::~:.::.:...:~.., ."....~,..."...C~~"."..,'~;...,;....~::;:.~::::::: :::::::.::,..,_.,,,,,~,,~~,.,.L,.L"';.,~;,,,,~,,~"~.~.,"".""''''~''''~L''~''.L.~,~;.:~.....:...:~::::::::::~::::::::::~:::::::::::"";".'~~""'''''''i'.."...,."".",u'~~.:,.,...C.,;....;. ..C~;.... ~.....~...:_m'.
58~ 5~ ~~ ~1;~~ ~~Oo ~~~JQc; ~~ ~~. ~'700 ~8~O' 6~~ ~6~ ;1'Or; '7'~~ 7dOr; ~~~~ ~~ 7~~ ~7~ 78~ ~~. 8d~ ~·1Ö~ ~2ri~ 8~~ ~~ 8~~ ~~Ö~ ~7~ 8~~O' ~9t;O 90~ ~'1~~;~~ ~~O;~~~ 9~ ~~'~7rio
BP Amoco
,....,:-:-..::
- ...:::
v........
.....
11....
Wl!LLPATM DeTAIL.
~.1tM
IIUtU"JOI
.....
12717.11
___ ....... I......ft
= =::::';\0
......
".':I'.:
"H
.... n.lO
REFERENCE INFORMATION
Co-ri_(NiEj Reference, Weft CentnI: S-102, TNe Nonh
VenlœI (lVD Refemnoe: System: Moan se. Level
M"=~=: ~(~'=-°9:EJ..20 64.20
Celculetlm Me1hod: Minmum CUrvature
..... AaJ
, 111'''.'' ...n .....
· ,....... ..... ~..,
, 1II4LOO ...,. 81'"
4 ,....... ..... .,.1,
· "OfL,1 ..... .,.....
1 ",4L,1 ..... "a.,.
l' 1M'G." ...... 312."
· ,,.,.... .,... ...,.
I ,,,,..,. sa.... 11'..11
,a '4....,......' ...,.
tt ,..,110.,....., "."
,1.....110.,. No" u.,.
,S 14'...'...... ".'4
'4'.....,...... ..,..
~! ~!!!!-l!!H! !H!
IIÐTIOIII KT.....
no - ..... T.....
......1 ....... ........ a.aa .... U-a4.'a
....... ;::.~ ...- a." ..... DU.'"
....... "I""'" .... ,..... 121'4.1'2
17'..... ""'.11 ........ ...aa ,...aa .......
"..... ....... ·It,..,., ...aa .... 14"....
.,....u ",..,. ..,..... '..aa ...... ......ao
17M... It...., .10..... 1I.GO ..... .......
"..,.1. _... .u,..., '1.00 ..... .......
"..... ....... ........ 1I.ao ...... -..,
If"" .".... ...,.... ,I.DO ..... '...I.aa
".." -... ........ 11.00 ...... ",.......
....... 1'01." ...... ..... ..... .......
I.,...' ~'.M ........ '1.00 .-.GIII "'1'.GO
....... .....,. ........ 'I.al ..... It....
.781'.34 ....~, "!!!!-!! ~!.!! ~.!! !!!!-!!
......, .",..,..
AllNOTATION.
1J'RŒT DETM.S
,.."" 1VO +NI..s <VJN..
.1QJA"-3 1S736.00 ,721U10.fal.14 Potf
So'" T31 1S1..s_00 1III&to --IS121.33 PoW
",1.QAT32 1S7..s.DO ISt.&3·I3OUD F"MII
",Q2¡t,T44 1S77&.00'00'I3_0& -w.n.14 PoW
"". ..
II8M.81
.......
H.....
.T.....
I''''''
".... t
"... 1
l7oU.U 1
"3I.Nt
173L73 t
lno.S7 t
17.... t
170.11 t
..,pHt ·111
11 11I7.M "SIt.11
tl 1f1S.17 tts,....
-
-
R'"
·
·
·
·
,
·
·
..
11
..
..
..
..
TD
.~......:.:...:
·:::::··,K·
57oo·J"''';·''';''''',.¿1{J-J.. .
.j$'.(U~S
. - ..·/$(r9'S·......
1¿Z
..~r
5800':;·
..
...~5'.3;l'.....
..........-.............. .
5900·]"
...
'='6000' j.. :
r:'~
i 6100]
C .~
~62oo·1
I:::¡......:....,~:...u
ii 6500.J·· .
U·~
1:: r,.".. .':
CII o"'~
>
CD 'i'·.~i
E····" '"
r- ~:"J',J
;';
.....
..'.. . ~ .¡
. :':'
:.¡
::
........................
....:..'.
:'
..'~.~
1':;";
~"'~:' ,
-II"
~. '··.h....,...._
w riT-"'t,·,q:.·....:~......·i'..,......-:-
~ . ~.... .
\ :~':I"'" i
6900·:l
.,.
O.·:··:·:.}·.···.þp
,. .
T
"M
AzImuths to True North
Magnetic North: 25.44'
Magnetic Field
Strength: 57556n T
Dip Angle: eo.85'
Date: 617/2003
Model: bggm2003
LEGEND
Plan 8-11 I.\!:,,", So 1I)
~1~~182Þe1}
PIonMS·1Q2A
PIon ..
Plan: Plan 114 (S·102/Plan" S-102A)
C/e8t8d By: Br'j Potnis Date: 8/7/2003
Bill
B.... ._,,¡
... ...~::
..................................... ~::,
INTßQ ~.:...
'ì'··
..:....
~
4
Contact Information.
~.::¡¡: ~.7) 267:6~~qcom
Bokor Hugh.. INTEQ: (;:ð4)ra7~OO
.-
....
r:
~
Q
r:!.
-.
+
,
o
Z
;::;.
.
-
.c
..
:I
o
rn
: :: : ·
"UW ...... ,- 110. I ,.., .:
Y.l I n
... :.. : .: : ...
: f .. ..: ..:. ..: :. . ·
10200·: .:.: .... : :.. ~: .: :'"
... ... :.. O!l /
:.. ..:. .'\
.w ,
~ .....
.
....:.. .:... .: /: .... .. .. ..
. .... ... / \
·
'-
. '-'
."
... ... ,: ...
~w .... .: .: . .. !.U .:..
8800·: .:.. ........ ..:. ....
· ....
.. .. .. ...
.:. .... .œ-. ..: \...
... .
.:
:: m. u
e
:\~::.:,
.,.",~:;
..
........'..~.\::. ..................
': ., ' . ,
...j~ :: -." " .:.. ,. .'.. .... '. : : .. . . .. .............. . . . . . .. . . . .. .. . .. .
·~~.:·~+~+r·..H·:.~·:·:·~·~·~·,·~:'~·...:·~·r·..~·:·,·+~·~·:·~·~·r1·: :1'· i n ·'·~·r·..'···..r1 ., ~.:' ~ :..~.~.:. ~ :.¡ ·'¡-:1-:· "..1·:·..·,·~·:·, y¡ ...~.¡,..,.;., " ·..;·:·,-..:i·..~·;·; ..:·:·,·~·:·,.1·; ......., , ,
~~~.~~~~~...~..~~.~~~~~~~~~
West(-)/East(+) [200ft/In]
e
7600- 'J
....
.......
..
7400"':
.....
-:\"'
7200
::
'. ...
, - . . .
.,,, .. "".."..., ."""
, . . .:. . .. .:. .:. . . ' . . ' . ' . . .'. . . ~ .:.
··:···:·i
..
. . . . . . . , . .
,.
:¡
t
"-
ISI)lf>
.. f ,.... ~ . .,:!
"
'.
. ..
fPo
. .
:l
P, . '.;...:... '.
........---.................¡.--..........--.-.-.......---... ..~
lu.....u...............:......;:~:;~~~.~/... .
. ..
·..n.... .Un._n..., .
~: r1lir ~HU~~f:r: .~:if U
.,
..
O:·::··hPí
:", ....:: .. t.ol....
. .......~.... .
e BP-GDB e
Baker Hughes INTEQ Planning Report
.¡¡.
BAKU
HUGIll.
_.·,.,_._~~~u.·,.",.,·,.,..·,.,.,.unnU,.,.n
l.Nlff.Q
---....----...................-----.--..
--_..._.~--_..~-.-.~----_._._-_.....__.
I'a~e:
Company:
Field:
Site:
Well:
Wellpath:
~'-'-'-
BPAmoco
Prudhoe Bay
PB S Pad
S-102
Plan#4 S-102A
Date: 81712003 Time: J4:17:40
Co-ordinate(NE) Reference: Well: 5-102, True North
Vertical (TVD) Reference: System: Mean Sea level
Section (VS) Reference: Well (0.00N,O.00E.12.00Azi)
Survey Calcnlation M~thod: _h. Minim~m Curyalure I>II:
-........---...,
. -------- .--_.. .'---'
. .._-~_._._._---
Field: Prudhoe Bay
North Slope
UNITED STATES
Map System:US Slale Plane Coordinate System 1927
Geo Datum: NAD27 (Clarke 1866)
Sys I>atum: Mean Sea level
Map Zone:
Coordinate System:
Geomagnetic Model:
Site: PB S Pad
TR-12-12
UNITED STATES: North Slope
Site Position: Northing:
From: Map Easting:
Position Uncertainty: 0.00 ft
Ground Level: 0.00 fI
5980854.54 fI
617919.92 fI
Latitude: 70 21
Longitude: 149 2
North Reference:
Grid Convergence:
Well:
S-102
Slot Name:
Well Position: +N/-S -215.30 fI Northing: 5980655.13 fI Latitude:
+EI-W 1006.86 fI Easting: 618929.96 fI Longitude:
Position Uncertainty: 0.00 fI
Wellpath: Plan#4 S-102A
500292297200
Current Datum: newrig Nabors ges 64.20
Magnetic Data: 81712003
Field Strength: 57556 nT
Vertical Section: Depth From (TVD)
ft
28.50
Drilled From:
é3-- TiiHIn Depth:
Height/ 64.20 fI Above System Datum:
, Declination:
Mag Dip Angle:
+N/-S +EI-W
fI fI
0.00 0.00
Oradc
Alaska, Zone 4
Wetl Centre
bggm2003
23.002 N
32.343 W
True
0.90 deg
70 21 20.884 N
149 2 2.910 W
S-102
12777.19 ft
Mean Sea level
25.44 deg
80.85 deg
Direction
deg
12.00
Targets
...,.._,,,....,..,--. .. ......... .. ..,.-..---
Map Map <- I.atitude ---> <--- I.on~itude ---> ¡
Name Description TV I) +N/-S H:/-W !\Iiorthin~ ":astin~ J)e~ Min See l)qt !\Iin Sl'C
l>ip. l>ir. fti ft ft fI../ ft
.... ... -./
S-102A T3.3 6735.0 8726.60 -6292.74 5989280.01 612500.00 70 22 46.683 N 149 5 7.077 W
S-102A T3.1 6745.00./ 7868.70 -6121.33 5988425.01v'612685~0 70 22 38.247 N 149 5 2.040 W
6745.001 59887601 ./
S-102A T3.2 8188.63 -6301.29 612500.00 70 2241.392 N 149 5 7.314 W
6775.~ ./ ./
S-102A T4.4 10013.05 -5422.14 5990580.01 613350.01 70 22 59.342 N 149 441.625 W
Annotation
\fl) TV))
ft fl
.. .". ..
12777.19 6684.81 TIP
12825.00 6684.20 KOP
12840.00 6684.24 3
12955.96 6714.52 4
13075.16 6744.82 5
13145.16 6744.82 6
13470.16 6744.82 7
13570.16 6743.92 8
13710.16 6739.64 9
14060.16 6736.73 10
14160.16 6739.37 11
14460.16 6746.69 12
14760.16 6752.61 13
15060.16 6758.99 14
15360.16 6767.34 15
15575.00 6775.17 TD
Company:
Field:
Site:
Well:
Wellpath:
0"::::'::':'[
.:.: co:' ..¡
. :.:.... .... ')t:'.
...;.....;:...' f-·'
BPAmoco
Prudhoe Bay
PB S Pad
8-102
Plan#4 S-102A
Plan: Plan #4
New TD TVD
Principal: Yes
Plan Section Information
MD
ft
12777.19
12825.00
12840.00
12955.96
13075.16
13145.16
13470.16
13570.16
13710.16
14060.16
14160.16
14460.16
14760.16
15060.16
15360.16
15575.00
~
Survey
!\ID
ft
12777.19
f~~~
~
12850.00
~t,O
~
1ß Ol?
12875.00
12900.00
12925.00
12950.00
12955.96
12975.00
13000.00
13007.81
13025.00
13050.00
13075.00
13075.16
13100.00
13125.00
13145.16
13150.00
13175.00
13200.00
13225.00
13250.00
13275.00
13300.00
13325.00
13350.00
13375.00
13400.00
13425.00
13450.00
Incl
deg
90.92
90.54
89.19
60.20
90.00
90.00
90.00
91.04
92.44
88.47
88.51
88.79
89.02
88.62
88.30
87.60
Inel
deg
90.92
90.74
90.54
89.19
86.69
80.44
74.19
67.94
61.69
60.20
64.96
71.21
73.16
77.46
83.71
89.96
90.00
90.00
90.00
90.00
90.00
90.00
90.00
90.00
90.00
90.00
90.00
90.00
90.00
90.00
90.00
90.00
90.00
A¡r.lm
deg
321.69
321.51
321.51
321.51
321.51
313.11
352.11
4.07
347.32
29.14
17.13
53.14
17.14
53.14
17.13
42.92
A¡r.lm
deg
321.69
321.60
321.51
321.51
321.51
321.51
321.51
321.51
321.51
321.51
321.51
321.51
321.51
321.51
321.51
321.51
321.51
318.53
315.53
313.11
313.69
316.69
319.69
322.69
325.69
328.69
331.69
334.69
337.69
340.69
343.69
346.69
349.69
e BP-GDB e
Baker Hughes INTEQ Planning Report
n'))
ft
6684.81
6684.20
6684.24
6714.52
6744.82
6744.82
6744.82
6743.92
6739.64
6736.73
6739.37
6746.69
6752.61
6758.99
6767.34
6775.17
Sys TV))
ft
6684.81
cæ~
.4
6684.59
6687.40
6692.88
6700.99
6711.62
6714.52
6723.28
6732.61
6735.00
6739.36
6743.44
6744.82
6744.82
6744.82
6744.82
6744.82
6744.82
6744.82
6744.82
6744.82
6744.82
6744.82
6744.82
6744.82
6744.82
6744.82
6744.82
6744.82
6744.82
R~.
BAKU
MUGlES
-'-_·.__·__~~~...'.-..nn,_~nn.·.·_un· .
INIßQ
--.................-------...---.--..---..-....-.
.-..--.---....----.
..-~.._.....~....__._-
+S/-S
ft
7635.80
7673.27
7685.01
7771.62
7860.77
7912.18
8195.21
8294.96
8434.00
8772.68
8864.44
9105.67
9346.94
9588.19
9829.41
10013.74
N/S
ft
7635.80
7653.69
7673.27
7685.01
7692.83
7712.27
7731.35
7749.85
7767.55
7771.62
7784.85
7802.99
7808.81
7821.83
7841.12
7860.65
7860.77
7879.81
7898.10
7912.18
7915.51
7933.24
7951.87
7971.35
7991.62
8012.63
8034.32
8056.63
8079.50
8102.87
8126.67
8150.83
8175.30
Date: 8r112oo3 Time: 14:17:40 Page: 2
Co-ordinate(NE) Reference: Well: 8-102, True North
Vertical (TVD) Reference: System: Mean Sea Level
Section (VS) Reference: Well (0.00N.0.ooE.12.00Azi)
Survey Calc.ulatioD Me!.~od: Mini~um C~~!:I~~~e ~b: Ora~~__
+E/-W
ft
-5936.38
-5966.08
-5975.41
-6044.28
-6115.17
-6162.59
-6309.24
-6312.57
-6323.04
-6274.03
-6234.83
-6065.04
-5895.23
-5725.42
-5555.65
-5449.14
....._'-..........
.~/W
ft
-5936.38
-5950.53
-5966.08
-5975.41
-5981.63
-5997.09
-6012.26
-6026.97
-6041.04
-6044.28
-6054.80
-6069.23
-6073.86
-6084.20
-6099.54
-6115.07
-6115.17
-6131.13
-6148.17
-6162.59
-6166.11
-6183.72
-6200.39
-6216.06
-6230.68
-6244.23
-6256.65
-6267.93
-6278.02
-6286.90
-6294.54
-6300.93
-6306.05
Date Composed:
Version:
Tied-to:
8r112003
3
From: Definitive Path
))LS Build Turn
deg/100ft deg/100ft deg/1ooft
. ..,. .. ....... ...."...
0.00 0.00 0.00
0.88 -0.79 -0.38
9.00 -9.00 0.00
25.00 -25.00 0.00
25.00 25.00 0.00
12.00 0.00 -12.00
12.00 0.00 12.00
12.00 1.04 11.96
12.00 1.00 -11.96
12.00 -1.13 11.95
12.00 0.03 -12.00
12.00 0.10 12.00
12.00 0.08 -12.00
12.00 -0.13 12.00
12.00 -0.11 -12.00
12.00 -0.33 12.00
]\hp N
ft
5988195.09
5988212.75
5988232.08
5988243.67
5988251.39
5988270.57
5988289.41
5988307.67
5988325.14
5988329.17
5988342.23
5988360.14
5988365.88
5988378.73
5988397.77
5988417.05
5988417.18
5988435.95
5988453.97
5988467.82
5988471.09
5988488.54
5988506.90
5988526.13
5988546.16
5988566.95
5988588.44
5988610.57
5988633.27
5988656.49
5988680.17
5988704.23
5988728.61
TF'O
deg
0.00
205.35
180.00
180.00
0.00
270.00
90.00
85.00
-85.00
95.00
-90.00
90.00
-90.00
91.00
-91.00
92.00
Tar¡:f't
... ..,........ .,.'''.-.....'''' ."".,.""...-----.... .."'..---..--. ...
M.a p.:
fI
612873.61
612859.17
612843.32
612833.80
612827.46
612811.70
612796.23
612781.23
612766.88
612763.57
612752.85
612738.14
612733.42
612722.87
612707.22
612691.39
612691.28
612675.03
612657.70
612643.06
612639.49
612621.60
612604.64
612588.67
612573.72
612559.85
612547.08
612535.45
612525.00
612515.75
612507.73
612500.96
612495.46
VS
ft
6234.70
6249.25
6265.17
6274.72
6281.07
I)I,S
deg/100ft
0.00
0.88
0.88
9.00
25.00
6296.87 25.00
6312.38 25.00
6327.42 .,,25.00
6341.80 /25.00
6345.12 25.00
6355.87 25.00
6370.62 25.00
6375.35 25.00
6385.92 25.00
6401.61 25.00
6417.48
6417.58
6432.88
6447.23
6458.00
6460.53
6474.21
6488.97
6504.77
6521.55
6539.29
6557.92
6577.40
6597.67
6618.68
6640.37
6662.68
6685.55
25.00
25.00
12.00
12.00
12.00
12.00
12.00
12.00
12.00
12.00
12.00
12.00
12.00
12.00
12.00
12.00
12.00
12.00
TFO
deg
0.00
205.35
205.34
180.00
180.00
Tool
TIP
MWD
KOP
3
MWD
180.00 MWD
180.00 MWD
180.00 MWD
180.00 MWD
180~00 4
360.00 MWD
0.00 MWD
0.00 S-102A T
360.00 MWD
360.00 MWD
360.00 MWD
360.00 5
270.00 MWD
270.00 MWD
270.00 6
90.00 MWD
90.00 MWD
90.00 MWD
90.00 MWD
90.00 MWD
90.00 MWD
90.00 MWD
90.00 MWD
90.00 MWD
90.00 MWD
90.00 MWD
90.00 MWD
90.00 MWD
Ot tit BP-GDB e
::c.} 1p
Baker Hughes INTEQ Planning Report '." .~.·U~~,.~__~....nn~~___·
IN'lti;Q
---....---....-
Company: BPAmoco Date: 8/7/2003 Time: 14:17:40
Field: Prudhoe Bay Co-ordinate(NE) Reference: Well: S-102, True North
Site: PB S Pad Vertical (TVD) Reference: System: Mean Sea Level
Well: 5-102 Section (VS) Reference: Well (0.OON,0.OOE.12.00Azi)
Wellpath: Plan#4 S-102A Survey Calculation Method: Minimum Curvature Db: Orade
.------... ----------..-...-----.---- -."----.--...---. .....__._"~._- -_.._~
Survey
....__...-. - .----"
MD Ind Azim Sys TVD N/S EIW MapN MapE VS DLS TFO Tool
ft deg deg ft ft ft ft ft ft deg/100ft deg
...... -.-.-'-' --- -.- .m..._........_.._____._.._... ",----_.-..
13470.16 90.00 352.11 6744.82 8195.21 -6309.24 5988748.46 612491.95 6704.36 12.00 90.00 7
13475.00 90.05 352.69 6744.82 8200.00 -6309.88 5988753.25 612491.24 6708.92 12.00 85.00 MWD
13500.00 90.31 355.68 6744.74 8224.87 -6312.41 5988778.07 612488.31 6732.72 12.00 85.00 MWD
13525.00 90.57 358.67 6744.55 8249.84 -6313.64 5988803.01 612486.68 6756.88 12.00 85.01 MWD
13550.00 90.83 1.66 6744.24 8274.83 -6313.57 5988828.00 612486.35 6781.34 12.00 85.03 MWD
13570.16 91.04 4.07 6743.92 8294.96 -6312.57 5988848.14 612487.04 6801.24 12.00 85.07 8
13575.00 91.09 3.49 6743.83 8299.79 -6312.25 5988852.98 612487.28 6806.03 12.00 275.00 MWD
13600.00 91.35 0.50 6743.29 8324.77 -6311.38 5988877.96 612487.75 6830.64 12.00 274.99 MWD
13625.00 91.60 357.51 6742.65 8349.75 -6311.81 5988902.93 612486.92 6854.99 12.00 274.93 MWD
13650.00 91.86 354.52 6741.89 8374.68 -6313.55 5988927.83 612484.79 6879.01 12.00 274.85 MWD
13675.00 92.10 351.52 6741.03 8399.48 -6316.59 5988952.57 612481.36 6902.64 12.00 274.76 MWD
13700.00 92.34 348.53 6740.06 8424.08 -6320.91 5988977.10 612476.64 6925.80 12.00 274.66 MWD
13710.16 92.44 347.32 6739.64 8434.00 -6323.04 5988986.99 612474.36 6935.07 12.00 274.54 9
13725.00 92.28 349.09 6739.03 8448.52 -6326.07 5989001.45 612471.10 6948.63 12.00 95.00 MWD
13750.00 92.01 352.08 6738.09 8473.16 -6330.15 5989026.02 612466.63 6971.89 12.00 95.07 MWD
13775.00 91.74 355.07 6737.27 8497.99 -6332.95 5989050.80 612463.44 6995.59 12.00 95.19 MWD
13800.00 91.46 358.06 6736.57 8522.93 -6334.45 5989075.71 612461.54 7019.68 12.00 95.28 MWD
13825.00 91.18 1.05 6736.00 8547.92 -6334.64 5989100.69 612460.95 7044.08 12.00 95.37 MWD
13850.00 90.89 4.03 6735.55 8572.89 -6333.53 5989125.68 612461.66 7068.74 12.00 95.44 MWD
13875.00 90.60 7.02 6735.22 8597.77 -6331.13 5989150.59 612463.68 7093.57 12.00 95.49 MWD
13900.00 90.32 10.01 6735.02 8622.49 -6327.43 5989175.36 612466.98 7118.52 12.00 95.53 MWD
13925.00 90.02 12.99 6734.94 8646.98 -6322.44 5989199.93 612471.58 7143.52 12.00 95.55 MWD
13950.00 89.73 15.98 6735.00 8671.19 -6316.19 5989224.23 612477.44 7168.49 12.00 95.56 MWD
13975.00 89.44 18.96 6735.18 8695.03 -6308.69 5989248.19 612484.57 7193.37 12.00 95.55 MWD
14000.00 89.16 21.95 6735.48 8718.45 -6299.95 5989271.74 612492.93 7218.10 12.00 95.53 MWD
14025.00 88.87 24.94 6735.91 8741.38 -6290.01 5989294.82 612502.51 7242.59 12.00 95.50 MWD
14050.00 88.59 27.92 6736.47 8763.76 -6278.88 5989317.37 612513.27 7266.80 12.00 95.45 MWD
14060.16 88.47 29.14 6736.73 8772.68 -6274.03 5989326.37 612517.98 7276.53 12.00 95.38 10
14075.00 88.47 27.36 6737.12 8785.75 -6267.01 5989339.55 612524.79 7290.77 12.00 270.00 MWD
14100.00 88.48 24.36 6737.79 8808.24 -6256.12 5989362.20 612535.33 7315.04 12.00 270.05 MWD
14125.00 88.49 21.35 6738.45 8831.26 -6246.41 5989385.38 612544.67 7339.58 12.00 270.13 MWD
14150.00 88.50 18.35 6739.11 8854.77 -6237.92 5989409.01 612552.78 7364.33 12.00 270.21 MWD
14160.16 88.51 17.13 6739.37 8864.44 -6234.83 5989418.73 612555.72 7374.44 12.00 270.29 11
14175.00 88.51 18.92 6739.76 8878.55 -6230.24 5989432.91 612560.09 7389.19 12.00 90.00 MWD
14200.00 88.51 21.92 6740.41 8901.96 -6221.52 5989456.46 612568.43 7413.91 12.00 89.95 MWD
14225.00 88.52 24.92 6741.06 8924.89 -6211.59 5989479.54 612577.99 7438.40 12.00 89.88 MWD
14250.00 88.53 27.92 6741.70 8947.27 -6200.47 5989502.09 612588.75 7462.60 12.00 89.80 MWD
14275.00 88.55 30.92 6742.34 8969.04 -6188.20 5989524.05 612600.68 7486.45 12.00 89.72 MWD
14300.00 88.57 33.92 6742.97 8990.14 -6174.80 5989545.35 612613.74 7509.87 12.00 89.64 MWD
14325.00 88.59 36.92 6743.59 9010.50 -6160.32 5989565.94 612627.90 7532.80 12.00 89.57 MWD
14350.00 88.62 39.92 6744.20 9030.08 -6144.79 5989585.77 612643.11 7555.18 12.00 89.49 MWD
14375.00 88.65 42.92 6744.79 9048.82 -6128.25 5989604.76 612659.34 7576.94 12.00 89.42 MWD
14400.00 88.69 45.92 6745.37 9066.67 -6110.76 5989622.89 612676.55 7598.04 12.00 89.35 MWD
14425.00 88.73 48.92 6745.93 9083.57 -6092.36 5989640.08 612694.68 7618.40 12.00 89.28 MWD
14450.00 88.77 51.92 6746.48 9099.50 -6073.10 5989656.31 612713.69 7637.98 12.00 89.21 MWD
14460.16 88.79 53.14 6746.69 9105.67 -6065.04 5989662.61 612721.65 7645.70 12.00 89.15 12
14475.00 88.79 51.36 6747.01 9114.76 -6053.30 5989671.88 612733.23 7657.02 12.00 270.00 MWD
14500.00 88.80 48.36 6747.53 9130.87 -6034.20 5989688.29 612752.08 7676.76 12.00 270.04 MWD
14525.00 88.80 45.36 6748.06 9147.96 -6015.96 5989705.66 612770.04 7697.26 12.00 270.10 MWD
14550.00 88.81 42.36 6748.58 9165.98 -5998.64 5989723.95 612787.07 7718.49 12.00 270.16 MWD
14575.00 88.83 39.36 6749.09 9184.88 -5982.29 5989743.11 612803.11 7740.38 12.00 270.23 MWD
14600.00 88.84 36.36 6749.60 9204.61 -5966.96 5989763.08 612818.14 7762.87 12.00 270.29 MWD
Company:
Field:
Site:
Well:
Wellpath:
Survey
-'--'---.-'--
bp
e BP-GDB e
Baker Hughes INTEQ Planning Report
...--.--------..----......
BP Amoco
Prudhoe Bay
PB S Pad
8-102
Plan#4 S-102A
...,.-.....
..-..----..----
MD Incl Azim Sys TVD
ft deg deg ft
_on' _._.._.._._______...__
14625.00 88.86 33.36 6750.10
14650.00 88.89 30.36 6750.59
14675.00 88.91 27.36 6751.07
14700.00 88.94 24.36 6751.54
14725.00 88.97 21.36 6752.00
14750.00
14760.16
14775.00
14800.00
14825.00
14850.00
14875.00
14900.00
14925.00
14950.00
14975.00
15000.00
15025.00
15050.00
15060.16
15075.00
15100.00
15125.00
15150.00
15175.00
15200.00
15225.00
15250.00
15275.00
15300.00
15325.00
15350.00
15360.16
15375.00
15400.00
15425.00
15450.00
15475.00
15500.00
15525.00
89.01
89.02
88.99
88.94
88.90
88.85
88.81
88.78
88.74
88.71
88.68
88.66
88.64
88.63
88.62
88.59
88.54
88.50
88.46
88.42
88.39
88.36
88.34
88.32
88.31
88.30
88.30
88.30
88.24
88.14
88.04
87.95
87.87
87.79
87.72
15550.00 87.66
15575.00 87.60
18.36
17.14
18.92
21.92
24.92
27.92
30.92
33.92
36.92
39.92
42.92
45.92
48.92
51.92
53.14
51.36
48.36
45.36
42.36
39.36
36.36
33.36
30.36
27.35
24.35
21.35
18.35
17.13
18.91
21.91
24.91
27.91
30.91
33.91
36.92
6752.44
6752.61
6752.87
6753.32
6753.79
6754.28
6754.79
6755.32
6755.86
6756.42
6756.99
6757.57
6758.15
6758.75
6758.99
6759.35
6759.98
6760.63
6761.29
6761.97
6762.67
6763.37
6764.09
6764.82
6765.55
6766.29
6767.04
6767.34
6767.79
6768.58
6769.41
6770.29
6771.20
6772.14
6773.12
----.-..--..----.---.--...'.
........-.-.---..
N/S
ft
9225.12
9246.34
9268.23
9290.72
9313.75
9337.26
9346.94
9361.05
9384.47
9407.40
9429.78
9451.55
9472.65
9493.02
9512.60
9531.34
9549.18
9566.09
9582.01
9588.19
9597.27
9613.38
9630.47
9648.49
9667.39
9687.11
9707.62
9728.84
9750.73
9773.21
9796.24
9819.74
9829.41
9843.52
9866.93
9889.86
9912.23
9933.99
9955.08
9975.44
.lill
BAIŒR
HUmES
INTßQ
Date: 8f712003 Time: 14:17:40 Page:
Co-ordinate(NE) Reference: Well: 8-102, True North
Vertical (TVD) Reference: System: Mean Sea Level
Section (VS) Reference: Well (0.00N,O.OOE.12.00Azi)
Survey Ca~culation l\!.ethod:.... Minim_,:,~ C,:,./Vature Db:
EIW
ft
-5952.67
-5939.48
-5927.42
-5916.52
-5906.81
-5898.32
-5895.23
-5890.63
-5881.91
-5871.98
-5860.86
-5848.59
-5835.19
-5820.70
-5805.17
-5788.64
-5771.15
-5752.75
-5733.49
-5725.42
-5713.69
-5694.59
-5676.36
-5659.04
-5642.69
-5627.36
-5613.08
-5599.89
-5587.83
-5576.94
-5567.23
-5558.75
-5555.65
-5551.06
-5542.35
-5532.42
-5521.31
-5509.04
-5495.65
-5481.18
___m_u'
MapN MapE VS DLS TFO
ft ft ft deg/100ft deg
-.--.-...-------".--."-----.---".
5989783.81 612832.09 7785.90 12.00 270.35
5989805.25 612844.94 7809.40 12.00 270.41
5989827.32 612856.65 7833.32 12.00 270.47
5989849.98 612867.20 7857.59 12.00 270.53
5989873.16 612876.54 7882.13 12.00 270.58
5989896.80
5989906.52
5989920.70
5989944.25
5989967.34
5989989.89
5990011.85
5990033.16
5990053.75
5990073.57
5990092.57
5990110.69
5990127.89
5990144.12
5990150.42
5990159.69
5990176.10
5990193.47
5990211.76
5990230.91
5990250.88
5990271.60
5990293.03
5990315.10
5990337.76
5990360.93
5990384.56
5990394.28
5990408.46
5990432.01
5990455.09
5990477.63
5990499.58
5990520.88
5990541.46
612884.65
612887.59
612891.96
612900.30
612909.87
612920.63
612932.56
612945.62
612959.78
612975.00
612991.23
613008.43
613026.56
613045.57
613053.53
613065.11
613083.96
613101.92
613118.94
613134.98
613150.00
613163.95
613176.80
613188.51
613199.05
613208.38
613216.49
613219.43
613223.80
613232.14
613241.70
613252.45
613264.37
613277.43
613291.57
7906.89
7917.00
7931.75
7956.48
7980.97
8005.18
8029.03
8052.45
8075.38
8097.76
8119.53
8140.62
8160.99
8180.57
8188.29
8199.61
8219.34
8239.84
8261.06
8282.95
8305.43
8328.46
8351.96
8375.87
8400.13
8424.67
8449.42
8459.53
8474.28
8499.00
8523.49
8547.68
8571.52
8594.93
8617.85
12.00
12.00
12.00
12.00
12.00
12.00
12.00
12.00
12.00
12.00
12.00
12.00
12.00
12.00
12.00
12.00
12.00
12.00
12.00
12.00
12.00
12.00
12.00
12.00
12.00
12.00
12.00
12.00
12.00
12.00
12.00
12.00
12.00
12.00
12.00
39.92 6774.13 9995.01 -5465.66 5990561.2~\ ~ 8640.22 12.00
42.92 6775.17 10013.74 -5449.14 C599058~~V 8661.97 12.00
4
Orade
"_.--
Tool
MWD
MWD
MWD
MWD
MWD
270.64 MWD
270.69 13
91.00 MWD
90.97 MWD
90.92 MWD
90.86 MWD
90.80 MWD
90.74 MWD
90.68 MWD
90.61 MWD
90.54 MWD
90.48 MWD
90.41 MWD
90.34 ~
90.26 .~
269.00 MWD
269.04 MWD
269.12 MWD
269.20 MWD
269.28 MWD
269.36
269.44
269.53
269.61
269.70
269.79
269.88
269.97
92.00
91.95
91.85
91.75
91.65
91.54
91.42
MWD
MWD
MWD
MWD
MWD
MWD
MWD
15
MWD
MWD
MWD
MWD
MWD
MWD
MWD
91.31 MWD
91.18 TD
B~.
BAKU
HUGHES
·.·,.·_·.·..~..~_·,.·,'_·~.·nn'u~_~'·· .
IN1ßQ
e
BP-GDB e
Anticollision Report
0""':,," t
.:.:.::::.... )r..J
. .- -., .. -f:.;;
"'-.;.".;."
BP Amoco
Prudhoe Bay
PB 5 Pad
5-102
Plan#4 5-10ZA
Compan)':
I'ield:
Reference Site:
Rl'ferem:l' Well:
Rl'ferellce Wellllal h:
Dall': 8/712003
Time: 14:03:30
Page:
Well: 5-102. True North
n()wrig Nabors ges 64.20 64.2
)II: Orade
Co-ordinatl'f' E) Reference:
Vertical (TV) Rdl'rence:
.. . "'-"'."'.
GLOBAL SCAN APPLIED: All weUpaths within 200'+ 100/1000 of reference - There ar~4ftells in thiilrktll'lan #4 & NOT PLANNED PROGRA
Interpolation Method: MD + 5tations Interval: 10.00 ft Error Model: ISCW5A Ellipse
Depth Range: 12825.00 to 15575.00 ft Scan Method: Trav Cylinder North
Maximum Radius: 1754.65 ft Error Surface: Ellipse + Casing
Casing Points
\10
ft
4816.00
11717.00
12825.00
15575.00
TV)
ft
3314.46
6762.28
6748.40
6839.37
l>iarnett'r
in
lIole Sil.e
in
Namt~
10.750
7.000
4.500
2.875
12.250
8.500
6.000
3.750
10 314"
7"
4 112"
27/8"
Plan: Plan #4
New TD TVD
Prineipal: Yes
8/7/2003
3
From: Definitive Path
Date Composed:
Version:
Tied-to:
Summary
.. ....,.__.. n. .
<----- Offset Wellpath -
Site Well
Refe.rence Offset
MD :\ID
ft ft
15360.16 13420.00
12830.00 12830.00
Ctr-Ctr Nu-<;o
Distance Area
ft ft
650.00 455.28
0.02 0.00
Allowable
l>eviatioD Warning
ft
....".n.. ..,..__"...."'...
194.72 Pass: Major Risk
0.02 Pass: NOERRORS
>
Wellpath
1- ~ r~~
Site: PB 5 Pad
Well: Plan 5-111 Rule Assigned:
Wellpath: Plan 5-111 V1 Plan: 5-111 wp01 V1 Inter-Site Error:
Reference Offsel Senai-\-lajur A¡¡is <:tr-(;t· ]\1;0-(;0
l\fI) TVD :\11) TV) Ref Offset TF()+AZI "'I-"()-IIS CasinglH!'i)istance Arca
ft ft ft ft ft ft dcg deg in ft ft
... .....__n___... . .. ..,..
15150.00 6825.49 12130.00 5886.58 29.34 54.53 99.75 57.39 8.500 1752.44 260.68
15150.00 6825.49 12140.00 5890.21 29.34 54.58 99.69 57.33 8.500 1743.09 260.80
15150.00 6825.49 12150.00 5893.83 29.34 54.64 99.63 57.27 8.500 1733.74 260.92
15150.00 6825.49 12160.00 5897.46 29.34 54.69 99.58 57.22 8.500 1724.40 261.05
15150.00 6825.49 12170.00 5901.09 29.34 54.74 99.52 57.16 8.500 1715.07 261.17
... .."........ m..
... .......... ".
Plan 5-111
5-102
Plan S-111 V1 Plan: 5-
5-102 V11
Major Risk
0.00 ft
Allu\O'able
Dniation
ft
1491.76
1482.28
1472.82
1463.36
1453.90
Warnill~
Pass
Pass
Pass
Pass
Pass
15150.00
15150.00
15150.00
15150.00
15150.00
6825.49 12180.00
6825.49 12190.00
6825.49 12200.00
6825.49 12210.00
6825.49 12220.00
5904.71
5908.34
5911.97
5915.59
5919.22
29.34
29.34
29.34
29.34
29.34
54.80
54.85
54.90
54.96
55.01
99.46
99.40
99.33
99.27
99.21
57.10
57.04
56.97
56.91
56.85
8.500
8.500
8.500
8.500
8.500
1705.74 261.29 1444.46
1696.43 261.41 1435.02
1687.12 261.53 1425.59
1677.82 261.64 1416.17
1668.53 261.79 1406.73
Pass
Pass
Pass
Pass
Pass
15150.00
15150.00
15150.00
15150.00
15150.00
6825.49 12230.00
6825.49 12240.00
6825.49 12250.00
6825.49 12260.00
6825.49 12270.00
5922.85
5926.4 7
5930.10
5933.73
5937.35
29.34
29.34
29.34
29.34
29.34
55.06
55.11
55.17
55.22
55.27
8.500
8.500
8.500
8.500
8.500
99.15
99.08
99.02
98.95
98.88
98.82
98.75
98.68
98.61
98.54
56.79
56.72
56.66
56.59
56.52
1659.24 261.91 1397.33
1649.97 262.03 1387.94
1640.70 262.14 1378.56
1631.44 262.26 1369.18
1622.19 262.37 1359.82
1612.95 262.48 1350.46
1603.71 262.60 1341.12
1594.49 262.71 1331.78
1585.28 262.82 1322.46
1576.07 262.93 1313.14
1566.77 274.46 1292.31
1557.56 275.64 1281.92
1548.37 276.84 1271.53
1539.18 278.04 1261.13
1529.99 279.26 1250.74
1520.82 280.48 1240.34
1511.65 281.71 1229.94
1502.59 293.41 1209.18
1493.42 293.50 1199.92
Pass
Pass
Pass
Pass
Pass
15150.00
15150.00
15150.00
15150.00
15150.00
6825.49 12280.00
6825.49 12290.00
6825.49 12300.00
6825.49 12310.00
6825.49 12320.00
5940.98
5944.61
5948.23
5951.86
5955.49
29.34
29.34
29.34
29.34
29.34
30.92
31.07
31.22
31.38
31.53
55.33
55.38
55.43
55.49
55.54
8.500
8.500
8.500
8.500
8.500
8.500
8.500
8.500
8.500
8.500
8.500
8.500
8.500
8.500
56.46
56.39
56.32
56.25
56.18
Pass
Pass
Pass
Pass
Pass
15159.59
15160.50
15161.41
15162.34
15163.28
6825.75 12330.00
6825.77 12340.00
6825.80 12350.00
6825.82 12360.00
6825.85 12370.00
5959.11
5962.74
5966.37
5969.99
5973.62
58.47
58.80
59.13
59.47
59.81
97.36
97.18
97.00
96.82
96.64
56.15
56.08
56.01
55.94
55.87
Pass
Pass
Pass
Pass
Pass
15164.22
15165.18
15175.00
15175.00
6825.87 12380.00
6825.90 12390.00
6826.17 12400.00
6826.17 12410.00
5977.25
5980.87
5984.50
5988.13
31.69
31.84
33.46
33.46
60.15
60.50
63.53
63.59
96.46
96.27
95.04
94.97
55.80
55.73
55.68
55.61
Pass
Pass
Pass
Pass
e
.
Nordic 2 CTD BOP Detail
¿fUI
I
I
~
rc=
HCR I
~
I
7-1/16" ID, 5000 psi working pressure t-r-- 2"Sideoutlets
Ram Type Oual Gate BOPE I TOT ~
Manual over Hydraulic I
xo spool as necessary \ /
I I
®
, I
®
I I
II THA I
L J~iTLT'T
Tu~ng ICQur
r Spool ì
I~
~
Methanol Injection .b!!.ð
Otis 7" WLA Quick I
Connect -
I
7-1/16" ID, 5000 psi working pressure )r
Ram Type Dual Gate BOPE
Manual over Hydraulic
TOT
Flanged Fire Resistant
Kelly Hose to Dual
Choke Manifold
Full production christmas
tree
MOJ
9/15/02
I.....
L
0'\t 1- CT Injector Head
I I
-- Stuffing Box (Pack-Off), 10,000 psi Working Pressure
~
7" Riser
I
"
Annular BOP (Hydril),7-1/16" ID
5000 psi working pressure
.J
I
/'
/
Fire resistant Kelly Hose to
Flange by Hammer up 1/4 Turn
Valve on OS Hardline to Standpip,
manifold
/
1/
1/
23/8" X 3 1/2" VBRs
23/8" Combi Pipe/Slip
2 flanged gate valves
Inner Annulus
Outer Annulus
p055122
DATE
DATE
7/14/2003
I I
CHECK NO.
055122
INVOICE / CREDIT MEMO
VENDOR
DISCOUNT
NET
DESCRIPTION
GROSS
7/14/2003 INV# PR071003L
PERMIT TO DRILL FEE
cs . \o;Z l.. ,
e
THE ATTACHED CHECK IS IN PAYMENT FOR ITEMS DESCRIBED ABOVE.
TOTAL ~
PAY:
TO THE
ORDER
OF:
e
**iM~:$lQ().öo*******1
.i .. N9rVALlD ~.~.~.~~:.~.~~_:.;~¡";":r._.",...;~.,...:):-.'j""¡;,,,,,,-~
i.... .i' .... ::'.\.'-:":"""':":":':"'{'j~:/;,:..':: ·:·:::··~.;·...X:: <'.j
...... ··-~h~fi:;: ...... --..- '..... .....¡
~1,'· ~î};r0ii~~~~J~:::~~;.,:j
1110 5 5 ¡. 2 2111 I: 0 l. ¡. 2 0 ~ B ~ 5 ¡: 0 ¡. 2 7 B ~ bill
WELL PE~MIT CH~C,KLlST Company BP EXPLORATION (ALASKA) INC Well Name: PRUDHOE BAY UN AURO S-102L 1 Program DEV Well bore seg
PTD#: 2031560 Field & Pool PRUDHOE BAY. PRUDHOE OIL - 640150 Initial ClasslType DEV 11-01L GeoArea 890 Unit 11650 On/Off Shore ~ Annular Disposal
Administration 1 P~rmitfee attached . . . . .. ....... Y~s . . . . . . . . . . . . . . . . . . . . . . . . . .. ........ ........
2 .Leas~numberappropriale. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . Yj'¡s . . . . . . . . . . . . . . . . . . .
3 .U.nlque weltn.atT1~.a!ld lJumb.er . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . Y~s . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
4 WeIUQc¡;¡t~d in.a. d.efioe.d .pool . . . . Yes. . . . . . . . . . . . . . . .. ...... . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
5 WeJUQc¡;¡led prpper .distance. from driJling uoilb.ouodary. . . . . . . . . . . . . . . Yes. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
6 Well JQcat~d proper .distance.from Qther wel!s. . . . . . . . . . . . . . . . . . . Y~s . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
7 .S.u{ficieot.acreage.aYailable in.drilJilJg unjt. . . . . . . . . . . . . . . . . . . . . . . . . . . . .. . Y~s . . . . . .
8 Jfd~viated, js weJlbQre pl¡;¡tiocJu.ded ....... . . . . . Yes. . . . . . . . . . . . . . . . . . . . . . . . . . . .
9 Operator oOly affected party. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . Yes . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
10 .Oper.ator has.appropriate. b.o!ld in .fQrce . . . . . . . . . . . . . . . . . . . .. ........... Yes. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
11 P~rmil carl be issued wjthQut co.nserva.!ioo Qrder. . . . . . . . . . . . . . . . . . . . . . . . . . . . Y~s . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
Appr Date 12 P~rmil c.a!l be issued wjthQut ad.mioistratilleapprovaJ . . . . . . . . . . . . . Yj'¡s . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
RPC 9/10/2003 13 Can permit be approved before 15-day wait Yes
14 WeIUQc¡;¡tedwithioareaan.d.str¡;¡ta.authQrizedbyllJjectioIJOrder#(puUOtlincomm.e!lts).(FQr. NA...... ......................................
15 AJI welJs. within .1l4.mile.area.of reyiew jdj'¡lJtified (Fpr ~ervjCß.w.ell OOly). . . . . . . . . . . . . . . .NA. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
16 Pre-produced i!ljector: duratiQnof pre-produGlioo I~ss. than. 3 mooths (For service well QnJy) . . .NA. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
17 ACMP.Fioding.of CQn.si$te!lcy.h.as bee.njssued. for.this prolect. ............... . .NA. . . . . . . . . . . . .
Engineering
Appr Date
WGA 9/10/2003
Geology
Appr
RPC
Date
9/10/2003
Geologic
Commissioner:
~
o
- - - - - - -
- - - - - - - - - -
- - - - - -
- - - - - - - - - - - - --
e
- - - - - -
18 .C.o!lductor striOg.prQvided . . . . . . . . . . . . . . . . . . . . . . . . NA. . . . . . . . . . . . . . . . . . . . . .
19Surfac~c¡;¡~iog.PJQtect~ all.knQwn USDWs . . . . . . . . . . . . . . . . . . NA. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
20CMTv.oladequ.ate.lo circ.utate.o.n.cood.uctor& SUJf.csg . . . . . . . . . . . . . . . . . NA. . . . . . . . . . . . . . . . . . . . . . . . . . .
21CMT vol adequate.to tie-inJQng .stri!lg to.surf ~g. . . . . . . . . . . . . . . . . . . . . . . . . NA. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
22 .CMTwill Coyer.aH klJo.w.n.Pfoductiye hQrizQns . . . . . . . . . . . . . . . . . . No. . . . . . . . Slotted, . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
23 .C.asi!lg de.sig!lS ad.eç¡ua.!e for C..T~ B&permafr.ost . . . . . . . . . . . . . .. .......... Y~s . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
24 .Adequatetank¡;¡geOJ re.serve pit. . . . . . . . . . . . . . . . . . . . . y~s . . . CTDU. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
25 Jf.a.re-drilt has a to-403 fQr abandonment be~1J ¡;¡PPJQved . . . . . . . . .NA. . . . . . . . La.!eral.. . . . . . . . . . . . . . . . . . . . . . . . . . . . .
26 .Adequj:lte.w.ellbore~epar¡;¡tjo.n.propo~ed................................. .Y~s. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
27 Jfdjvecter Jeq.uired, dQes jt.meet.reguJatioos . . . . . . . . . . . . . . . . NA. . . . . . . . Sidetrack.. . . . . . . . . . . . . . . . . . . . . . . . . . .
28 DrilJilJg flujd.prQgram sc;hematic.& eC.uiplistadequ¡;¡t~ . . . . . . . . . . . . . . . . . . . . . . Y~s . . . . . . . Max MW.8~9 ppg.. . . . . . . . . . . . . . . . . . . . . .
29 .B.OPEs..d.o.they meelreguJatioo . . . . . . . . . . . . . . . . . . . . . . . . . . . . Y~s . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
30 BOPEpressra.!ilJg appropriate; .testlo.(pu.! psig incommeots) . . . . . . . . . . . . . . . y~s . . . . . Test l03500. psi. .MS~ 23.27 psi.. . . . . . .
31ChokemanjfQld cQmpJie~ w/APtR~-53 (May 84) . . . . . . . . . . . . . . . Y~s . . . . . . . . . . . . . . . . . . . .
32 WQrk will occur withoutoper¡;¡tjo.n .shutdown. . . . . . . . . . . . . . . . . . . . . . . . Yj'¡s . . . . . . . . . . . . . .
33 I~ pre~e!lce Qf H2S gas. prQb.able. . . . . . . . . . . . . . . . . . .. . No. . . . . . . . . . . . . .
34 Meçha.nic¡;¡l.colJdjtio!lpfwellswithio80RYerifiecl(for.s.ervicew~1Jonly). ..... NA......
-
- - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - - - - - - --
35 P~rmil ca!l be issued w!o hydrogen sulfide meaS).Jres. . . . . . No. . . . . .
36 .D.ata.preseoted on pote.ntial oveJpres.sure .zooes . . . . . . . . . . . . . .NA. .
37S~i$mic.analysjs. Qf shaJlow gas.z.olJes . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .NA.
38 .S~abedcoodjtiolJ survey .(if Qff-sh.ore) . . . . . . . . . . . . . . . . . . . . . . . . . . . . . NA.
39 . CQnta.ct oamelphon.e.for.we~kly progress reports [expIQr¡;¡tory .0!lIYl . . . . . . . . . . . . . NA. . . . . . . .
- - - - - - - - - - - - - - - - - - -
- - - - - -
- - - - - - - - - - - - - - - -
- - - - --
- - - - - - - - -
- - - - - - - - - - - - - - - - - - - - - - - - - - - - --
- - - - - -
- - - - - - - - - - - - - - - - - -
- - - - - - - - - - - - - - - - - - - -
- - - - - - - - - - - - - - - - -
- - - - - - - - - - - - - - - - - -
- - - - - - - - - - - - - - - - - - - - - - - - - - - - -
- - - - - - -
Date:
Engineering
~ioner:
Public VY7
Commo,;o..., <J'~/~
Date
.J;
-
-
-===-
J
e
e
Well History File
APPENDIX
Information of detailed nature that is not
particularly germane to the Well Permitting Process
but is part of the history file.
To improve the readability of the Well History file and to
simplify finding information, information of this
nature is accumulated at the end of the file under APPENDIX.
No special effort has been made to chronologically
organize this category of information.
.
.
ó)C0-\S(o
$Revision: 3 $
LisLib $Revis1on: 4 $
Thu Jan 22 07:25:00 2004
) d--- ') 9í'
Sperry-Sun Drilling Services
LIS Scan Utility
Reel Header
Service name.............LISTPE
Date.................... .04/01/22
Origin. . . . . . . . . . . . . . . . . _ . STS
Reel Name. _ _ _ _ _ _ _ . . . . _ . _ _ UNKNOWN
Continuation Number____..01
Previous Reel Name.......UNKNOWN
Comments.................STS LIS Writing Library. Scientific Technical Services
Tape Header
Service name.____.._...._LISTPE
Date.....................04/01/22
Origin. . . . . . . . . . . . . . . . . . . STS
Tape Name................UNKNOWN
Continuation Number._.___01
Previous Tape Name.......UNKNOWN
Comments.._..............STS LIS Writing Library. Scientific Technical Services
Physical EOF'
Comment Record
TAPE HEADER
Prudhoe Bay
MWD/MAD LOGS
#
WELL NAME:
API NUMBER:
OPERATOR:
LOGGING COMPANY:
TAPE CREATION DATE:
#
,JOB DATA
S-102Ll
500292297260
BP Exploration (Alaska)
Sperry-Sun Drilling Services
22-JAN-04
JOB NUMBER:
LOGGING ENGINEER:
OPERATOR WITNESS:
MWD RUN 1
MW0002737220
C. ASUCHAK
R. WHITLOW/ J
MWD RUN 2
MW0002737220
C. ASUCHAK
R. WHITLOW/J
MWD RUN 3
MW0002737220
C. ASUCHAK
R. WHITLOW/J
JOB NUMBER:
LOGGING ENGINEER:
OPERATOR WITNESS:
MWD RUN 4
M"w0002737220
B. JAHN
R. WHITLOW/J
MWD RUN 5
MW0002737220
B. JAHN
J_ EGBEJIMBA
MWD RUN 6
MW0002737220
B. JAHN
J. EGBEJIMBA
JOB NUMBER:
LOGGING ENGINEER:
OPERATOR WITNESS:
MWD RUN 7
MW0002737220
B. JAHN
J. EGBEJIMBA
#
SURFACE LOCATION
SECTION:
TOWNSHIP:
RANGE:
FNL:
FSL:
FEL:
FWL:
ELEVATION (FT FROM MSL 0)
KELLY BUSHING:
DERRICK FLOOR:
GROUND LEVEL:
35
12N
12E
RECEIVED
4452
4499
r ~.,-::. AI ,. ')r\IÜ~ ,1
.' ," J. .
. ......) ~. ~.'- ;:.¡.
64.20
#
WELL CASING RECORD
A¡~gk6(j;! ~ ~'X! I"-MftS Camm........."
"..1"h,.e,}"~. ~,:.~ t'!t. ~QW' \A.:.11, I i\HßU
t r..,.¡"MMA
F""'¡¡'¥I\..;:...
OPEN HOLE CASING DRILLERS
BIT SIZE (IN) SIZE (IN) DEPTH (FT)
~i:S~N\~
.
.
1ST STRING
2ND STRING
3RD STRING
PRODUCTION STRING
3.750
4.500
11558.0
#
REMARKS:
1. ALL DEPTHS ARE BIT DEPTHS UNLESS OTHERWISE NOTED.
THESE DEPTHS ARE
MEASURED DEPTH (MD).
2. ALL VERTICAL DEPTHS ARE TRUE VERTICAL DEPTH - SUBSEA
(TVDSS) .
3. MWD RUNS 1, 2, 6 COMPRISED DIRECTIONAL AND DUAL
GAMMA RAY (GM). RUN 1
ALSO INCLUDED PRESSURE WHILE DRILLING (PWD).
4. MWD RUNS 3 - 5, 7 COMPRISED DIRECTIONAL WITH GM; AND
ELECTROMAGNETIC
WAVE RESISTIVITY PHASE-4 (EWR4). RUN 7 ALSO INCLUDED
PWD.
5. LOG AND MERGED DIGITAL DA'I'A (LDWG) ONLY WERE SHIFTED
'1'0 A REEVES GAMMA
RAY RUN IN S-102 Ll ON 11/2/03. THESE DATA WERE
PROVIDED TO SSDS BY K.
COONEY, SIS, ON 1/13/04. LOG HEADER DATA RETAIN
ORIGINAL DRILLERS'
DEPTH REFERENCES.
6. MWD RUNS 1 - 7 REPRESENT WELL S-I02Ll WITH API#:
50-029-22972-60. THIS
WELL REACHED A TOTAL DEPTH ('I'D) OF
14980'MD/6788'TVDSS.
SROP SMOOTHED RATE OF PENETRATION WHILE DRILLING.
SGRC SMOOTHED GAMMA RAY COMBINED.
SEXP SMOOTHED PHASE SHIFT-DERIVED RESISTIVITY (EXTRA
SHALLOW SPACING).
SESP = SMOOTHED PHASE SHIFT-DERIVED RESISTIVITY (SHALLOW
SPACING) .
SEMP = SMOOTHED PHASE SHIFT-DERIVED RESISTIVITY (MEDIUM
SPACING) .
SEDP = SMOOTHED PHASE SHIFT-DERIVED RESISTIVITY (DEEP
SPACING) .
SFXE = SMOOTHED FORMATION EXPOSURE TIME.
$
File Header
Service name.............STSLIB.OOl
Service Sub Level Name...
Version Number...........l.0.0
Date of Generation.......04/01/22
Maximum Physical Record..65535
File Type................ LO
Previous File Name.......STSLIB.OOO
Comment Record
FILE HEADER
FILE NUMBER:
EDITED MERGED MWD
Depth shifted and
DEPTH INCREMENT:
#
FILE SUMMARY
PEU TOOL CODE
GR
FET
RPD
RPM
RPS
RPX
ROP
"
1
clipped curves; all bit runs merged.
.5000
START DEPTH
11627.0
12824.5
12824.5
12824.5
12824.5
12824.5
12842.0
STOP DEPTH
14932.0
14944.0
14944.0
14944.0
14944.0
14944.0
14982.0
.
.
BASELINE CURVE FOR SHIFTS:
CURVE SHIFT DATA (MEASURED DEPTH)
--------- EQUIVALENT UNSHIFTED DEPTH ---------
BASELINE DEPTH
11627.0
11628.5
11631.5
11635.0
11639.5
11642.0
11648.5
11650.5
11660.5
11669.0
11670.5
11673.0
12814.5
12816.5
12826.0
12831.5
12836.0
12838.0
12840.0
12851. 5
12860.0
12866.0
12885.0
12900.0
12905.5
12911.5
12915.5
12916.5
12920.5
12923.5
12932.0
12942.0
12945.5
12947.5
12952.5
12960.5
12965.5
12972.0
12973.5
12981.0
12989.0
12995.0
12999.5
13010.0
13012.0
13019.5
13023.5
13030.5
13042.0
13050.5
13053.0
13056.5
13065.5
13079.0
13087.0
13096.0
13102.5
13107.5
1311 7.0
13120.0
13126.0
13133.5
13135.0
13139.0
13145.0
13151. 5
13153.0
13164.5
13170.0
13180.0
13183.5
GR
11625.5
11627.0
11631. 0
11634.5
11639.0
11641.5
11647.0
11650.5
11658.0
11667.0
11669.0
11670.5
12814.5
12817.0
12826.0
12830.5
12835.0
12837.0
12840.0
12855.0
12862.5
12868.5
12889.5
12906.0
12910.0
12916.5
12920.0
12921. 0
12924.0
12928.5
12936.5
12943.0
12948.5
12950.0
12956.0
12962.0
12968.0
12973.0
12974.5
12984.5
12994.5
12999.0
13002.5
13013.5
13014.5
13022.5
13026.0
13030.5
13039.5
13049.0
13051.5
13056.0
13065.0
13082.0
13087.5
13096.0
13102.5
13107.0
13116.0
13119.0
13124.0
13133.0
13134.5
13138.0
13144.5
13150.5
13152.5
13164.5
13172.0
13181. 5
13185.0
e
.
13195.0
13217 . 0
13227.5
13237.0
13245.5
13254. 5
13262.5
13269.0
13275.0
13317.5
13326.5
13357.5
13379.0
13384.5
13390.0
13396.0
13408.0
13418.5
13432.0
13440.0
13450.0
13478.0
13488.0
13501.0
13522.0
13527.0
13550.0
13563.5
13572.0
13583.5
13597.5
13612.0
13619.5
13626.0
13643.5
13649.5
13656.5
13671. 5
13676.5
13698.5
13706.0
13708.0
13722.0
13736.5
13742.0
13744.0
13749.5
13794.0
13808.0
13841. 0
13843.0
13874.5
13888.5
13909.5
13928.0
13937.5
13947.5
13964.0
13974.0
13988.5
14000.0
14004.0
14010.5
14019.5
14072.5
14084.0
14112.5
14121.5
14167.0
1417 4.0
14183.0
14199.5
14218.0
14226.0
14231. 0
13196.5
13216.5
13228.0
13237.0
13246.5
13256.0
13263.0
13269.5
13276.0
13317 . 0
13326.0
13357.0
13378.5
13385.5
13390.5
13396.0
13409.0
13419.0
13432.0
13440.0
13449.5
13477.5
13488.0
13501.5
13521. 5
13528.0
13551.5
13564.5
13573.0
13585.0
13599.0
13612.5
13618.0
13625.5
13643.0
13648.0
13655.5
13669.0
13674.0
13696.0
13706.0
13707.5
13722.5
13735.5
13742.0
13743.0
13750.0
13793.0
13808.5
13841.0
13843.0
13874.0
13888.5
13908.0
13927.5
13936.0
13945.5
13965.0
13972.5
13988.5
13999.0
14005.5
14012.0
14020.0
14075.5
14085.5
14115.5
14123.0
14170.0
14176.0
14185.0
14201. 0
14217 . 5
14225.5
14230.0
e
.
14235.5
14243.5
14254.5
14264.0
14280.5
14287.0
14293.5
14298.5
14982.0
$
14236.0
14244.0
14255.0
14266.0
14282.5
14289.0
14293.0
14297.5
14981. 0
#
MERGED DATA SOURCE
PBU TOOL CODE
MWD
MWD
MWD
MWD
MWD
MWD
MWD
$
BIT RUN NO
1
2
3
4
5
6
7
MERGE TOP
11625.5
13010.5
13296.0
13473.5
13694.5
14270.5
14392.0
MERGE BASE
13010.5
13296.0
13473.5
13694.5
14270.0
14392.0
14981. 0
#
REMARKS:
MERGED MAIN PASS.
$
#
Data Format Specification Record
Data Record Type.................. 0
Data Specification Block Type.....O
Logging Direction.................Down
Optical log dept_h unit"s...........Feet
Data Reference Point..............Undefined
Frame Spacing.....................60 .1IN
Max frames per record.............Undefined
Absent value......................-999
Depth Units.......................
Datum Specification Block sub-type...O
Name Service Order Units Size Nsam Rep Code Offset Channel
DEPT FT 4 1 68 0 1
ROP MWD FT/H 4 1 68 4 2
GR MWD API 4 1 68 8 3
RPX MWD OHMM 4 1 68 12 4
RPS MWD OHMM 4 1 68 16 5
RPM MWD OHMM 4 1 68 20 6
RPD MWD OHMM 4 1 68 24 7
FET MWD HOUR 4 1 68 28 8
E'i rst Last
Name Service Unit Min Max Mean Nsam Reading Reading
DEPT FT 11627 14982 13304.5 6711 11627 14 982
ROP MWD FT/H 0.2 1688.79 80.9207 4281 12842 14982
GR MWD API 39.11 447.59 71. 3961 4338 11627 14932
RPX MWD OHMM 0.63 2000 19.2127 4240 12824. 5 14 944
RPS MWD OHMM 0.66 2000 21. 9018 4240 12824.5 14944
RPM MWD OHMM 0.93 2000 20.3509 4240 12824.5 14944
RPD MWD OHMM 2.42 2000 25.2086 4240 12824.5 14944
FET MWD HOUR 0.18 63.04 7.23748 4240 12824.5 14944
First Readj.ng For Entire File......... .11627
Last Reading For Entire File...........14982
File Trailer
Service name........... ..STSLIB.001
Service Sub Level Name...
Version Number...........1.0.0
Date of Generation.......04/01/22
Maximum Physical Record..65535
File Type............... .LO
Next File Name...........STSLIB.002
.
Physical EOF
File Header
Service name.............STSLIB.002
Service Sub Level Name...
Version Number...........l.0.0
Date of Generation.......04/01/22
Maximum Physical Record..65535
File 'l'ype................ LO .
Previous File Name.......STSLIB.OOl
Comment Record
FILE HEADER
FH,E NUMBER:
RAW MWD
Curves and log
BIT RUN NU1'-1BER:
DEPTH INCREMENT:
#
FILE SUMMARY
VENDOR TOOL CODE
GR
ROP
$
2
.
header data for each bit run in separate files.
1
.5000
START DEPTH
11625.5
12842.5
STOP DEPTH
12983.5
13010.5
#
LOG HEADER DATA
DATE LOGGED:
SOFTWARE
SURFACE SOFTWARE VERSION:
DOWNHOLE SOFTWARE VERSION:
DATA TYPE (MEMORY OR REAI,-TIME):
'I'D DRILLER (FT):
TOP LOG INTERVAL (FT):
BOTTOM LOG INTERVAL (FT):
BIT ROTATING SPEED (RPM):
HOLE INCLINATION (DEG
MINIMUM ANGLE:
MAXIMUM ANGLE:
#
TOOL STRING (TOP TO
VENDOR TOOL CODE
GM
$
BOTTOM)
TOOL TYPE
Dual GR
#
BOREHOLE AND CASING DATA
OPEN HOLE BIT SIZE (IN):
DRILLER'S CASING DEPTH (FT):
#
BOREHOLE CONDITIONS
MUD TYPE:
MUD DENSITY (LB/G):
MUD VISCOSITY (S):
MUD PH:
MUD CHLORIDES (PPM):
FLUID LOSS (C3):
RESISTIVITY (OHMM) AT TEMPERATURE (DEGF)
MUD AT MEASURED TEMPERATURE (MT):
MUD AT MAX CIRCULATING TERMPERATURE:
MUD FILTRATE AT MT:
MUD CAKE AT MT:
#
NEUTRON TOOL
MATRIX:
MATRIX DENSITY:
HOLE CORRECTION (IN):
#
TOOL STANDOFF (IN):
EWR FREQUENCY (HZ):
#
REMARKS:
$
#
Data Format Specification Record
Data Record Type.................. 0
26-0CT-03
Insite
4.3
Memory
13010.0
12845.0
13010.0
64.0
82.5
TOOL NUMBER
93091
4.125
11558.0
Flo Pro
8.60
50.0
9.0
21000
8.8
.000
.000
.000
.000
.0
131.0
.0
.0
.
.
Data Specification Block Type.....O
Logging Direction.................Down
Optical log depth units...........Feet
Data Reference Point..............Undefined
Frame Spacing.....................60 .1IN
Max frames per record.............Undefined
Absent value...................... -999
Depth Uni ts . . . . . . . . . . . . . . . . . . . . . . .
Datum Specification Block sub-type...O
Service Order
Units
FT
FT/H
API
Size
4
4
4
Code
Offset
o
4
8
Channel
1
2
3
Name
DEPT
ROP
GR
MWDOlO
MWD010
Nsam
1
1
1
Rep
68
68
68
First Last
Name Service Unit Min Max Mean Nsam Reading Reading
DEPT FT 11625.5 13010.5 12318 2771 11625.5 13010.5
ROP MWD010 FT/H 1.17 118.47 46.653 337 12842.5 13010.5
GR MWD010 API 40.13 447.59 86.2039 439 11625.5 12983.5
First Reading For Entire File..........11625.5
Last Reading For Entire File...........13010.5
File Trailer
Service name.............STSLIB.002
Service Sub Level Name...
Version Number...........1.0.0
Date of Generation.......04/01/22
Maximum Physical Record..65535
Fi I e Type................ LO
Next File Name...........STSLIB.003
Physical EOE'
File Header
Service name.............STSLIB.003
Service Sub Level Name...
Version Number...........l.O.O
Date of Generation.......04/01/22
Maximum Physical Record..65535
File Type............... .LO
Previous File Name.......STSLIB.002
Comment Record
FILE HEADER
FILE NUMBER:
RAW MWD
Curves and log
BIT RUN NUMBER:
DEPTH INCREMENT:
#
FILE SUMMARY
VENDOR TOOL CODE
GR
ROP
$
3
header data for each bit run in separate files.
2
.5000
START DEPTH
12984.0
13011.0
STOP DEPTH
13269.0
13296.0
#
LOG HEADER DATA
DATE LOGGED:
SOFTWARE
SURFACE SOFTWARE VERSION:
DOWNHOLE SOFTWARE VERSION:
DATA TYPE (MEMORY OR REAL-TIME):
TD DRILLER (FT):
TOP LOG INTERVAL (FT):
BOTTOM LOG INTERVAL (FT):
BIT ROTATING SPEED (RPM):
HOLE INCLINATION (DEG
27-0CT-03
Insite
4.3
Memory
13296.0
13010.0
13296.0
.
MINIMUM ANGLE:
MAXIMUM ANGLE:
/I
TOOL STRING (TOP TO BOTTOM)
VENDOR TOOL CODE TOOL TYPE
GM Dual GR
$
#
BOREHOLE AND CASING DATA
OPEN HOLE BIT SIZE (IN):
DRILLER'S CASING DEPTH (FT):
/I
BOREHOLE CONDITIONS
MUD TYPE:
MUD DENSITY (LB/G):
MUD VISCOSITY (S):
HUD PH:
HUD CHLORIDES (PPM):
E'LUID LOSS (C3):
RESISTIVITY (OHMM) AT TEMPERATURE (DEGF)
MUD AT MEASURED TEMPERATURE (MT):
MUD AT MAX CIRCULATING TERMPERATURE:
MUD FILTRATE AT MT:
MUD CAKE AT MT:
/I
NEUTRON TOOL
I'1ATRIX:
I'1ATRIX DENSITY:
HOLE CORRECTION (IN):
#
TOOL STANDOFF (IN):
EWR FREQUENCY (HZ):
#
REMARKS:
$
#
Data Format Specification Record
Data Record Type.................. 0
Data Specification Block Type.....O
Logging Direction.................Down
Optical log depth units...........Feet
Data Reference Point..............Undefined
Frame Spacing..................... 60 .1IN
Hax frames per record.............Undefined
Absent value...................... -999
Depth Units.......................
Datum Specification Block sub-type...O
Name
DEPT
ROP
GR
Service Order
Units
FT
FT/H
API
Size
4
4
4
Rep
68
68
68
Code
Nsam
I
1
I
HWD020
HWD020
79.1
92.0
TOOL NUHBER
72829
4.125
11558.0
Flo Pro
8.60
.0
9.2
21000
.0
.000
.000
.000
.000
Offset
o
4
8
Channel
1
.
.0
120.0
.0
.0
2
3
First Last
Name Service Unit Min Max Mean Nsam Reading Reading
DEPT FT 12984 13296 13140 625 12984 13296
ROP HWD020 FT/H 1.11 102.06 48.1151 571 13011 13296
GR HWD020 API 44.44 131.51 84. 2569 571 12984 13269
First Reading For Entire File..........12984
Last Reading For Entire File...........13296
File Trailer
Service name.............STSLIB.003
Service Sub Level Name...
Version Number...........I.O.O
Date of Generation.......04/01/22
Haximum Physical Record..65535
File Type................ LO
Next File Name...........STSLIB.004
.
Physical EOF
File Header
Service name.............STSLIB.004
Service Sub Level Name...
Version Number...........1.0.0
Date of Generation.......04/01/22
Maximum Physical Record..65535
File Type............... .LO
Previous File Name.......STSLIB.003
Comment Record
FILE HEADER
FILE NUMBER:
RAW MWD
Curves and log
BIT RUN NUMBER:
DEPTH INCREMENT:
#
FILE SUMMARY
VENDOR TOOL CODE
FET
RPD
RPM
RPS
RPX
GR
ROP
$
4
.
header data for each bit run in separate files.
3
.5000
START DEPTH
12824.5
12824. 5
12824.5
12824.5
12824.5
13269.5
13296.5
STOP DEPTH
13441.5
13441.5
13441.5
13441.5
13441.5
13429.0
13473.5
#
LOG HEADER DATA
DATE LOGGED:
SOFTWARE
SURFACE SOFTWARE VERSION:
DOWNHOLE SOFTWARE VERSION:
DATA TYPE (MEMORY OR REAL-TIME):
'I'D DRILLER (FT):
TOP LOG INTERVAL (FT):
BOTTOM LOG INTERVAL (FT):
BIT ROTATING SPEED (RPM):
HOLE INCLINATION (DEG
MINIMUM ANGLE:
MAXIMUM ANGLE:
#
TOOL STRING (TOP TO BOTTOM)
VENDOR TOOL CODE TOOL TYPE
8M Dual GR
EWR4 ELECTROMAG. RESIS. 4
$
#
BOREHOLE AND CASING DATA
OPEN HOLE BIT SIZE (IN):
DRILLER'S CASING DEPTH (FT):
#
BOREHOLE CONDITIONS
MUD TYPE:
MUD DENSITY (LB/G):
MUD VISCOSITY (S):
MUD PH:
MUD CHLORIDES (PPM):
FLUID LOSS (C3):
RESISTIVITY (OHMM) AT TEMPERATURE (DEGF)
MUD AT MEASURED TEMPERATURE (MT):
MUD AT MAX CIRCULATING TERMPERATURE:
MUD FILTRATE AT MT:
MUD CAKE AT MT:
#
NEUTRON TOOL
MATRIX:
MATRIX DENSITY:
HOLE CORRECTION (IN):
#
TOOL STANDOFF (IN):
28-OCT-03
Insite
4.3
Memory
13473.0
13296.0
13473.0
89.1
91.2
TOOL NUMBER
82758
126589
3.750
11558.0
Flo-Pro
8.60
60.0
9.0
19500
9.2
.000
.000
.000
.000
.0
116.0
.0
.0
.
.
EWR FREQUENCY (HZ):
#
REMARKS:
$
#
Data Format Specification Record
Data Record Type.................. 0
Data Specification Block Type.....O
Logging Direction.................Down
Optical log depth units...........Feet
Data Reference Point..............Undefined
Frame Spacing..................... 60 .1IN
Max frames per record.............Undefined
Absent value..................... .-999
Depth Units.......................
Datum Specification Block sub-type...O
Name Service Order Units Size Nsam Rep Code Offset Channel
DEPT F'I' 4 1 68 0 1
ROP MWD030 FT/H 4 1 68 4 2
GR MWD030 API 4 1 68 8 3
RPX MWD030 OHMM 4 1 68 12 4
RPS MWD030 OHMM 4 1 68 16 5
RPM MWD030 OHMM 4 1 68 20 6
RPD MWD030 OHMM 4 1 68 24 7
FET MWD030 HOUR 4 1 68 28 8
First. Last
Name Service Unit Min Max Mean Nsam Reading Reading
DEPT FT 12824.5 13473.5 13149 1299 12824.5 13473.5
ROP MWD030 FT/H 0.73 125.82 71.537 355 13296.5 13473.5
GR MWD030 API 49.42 73.61 61. 5956 320 13269.5 13429
RPX MWD030 OHMM 0.63 2000 23.9811 1235 12824.5 13441.5
RPS MWD030 OHMM 0.66 2000 28.2106 1235 12824.5 13441.5
RPM MWD030 OHMM 0.93 2000 21. 9342 1235 12824.5 13441.5
RPD MWD030 OHMM 2.42 2000 34.598 1235 12824.5 13441.5
FET MWD030 HOUR 0.38 33.96 15.2744 1235 12824.5 13441. 5
First Reading For Entire File..........12824.5
Last Reading For Entire File...........13473.5
File Trailer
Service name.............STSLIB.004
Service Sub Level Name...
Version Number...........1.0.0
Date of Generation.......04/01/22
Maximum Physical Record..65535
Fi 1 e Type................ LO
Next File Name...........STSLIB.005
Physical EOF
File Header
Service name.............STSLIB.005
Service Sub Level Name...
Version Number...........1.0.0
Date of Generation.......04/01/22
Maximum Physical Record..65535
File Type............... .LO
Previous File Name.......STSLIB.004
Comment Record
FILE HEADER
FILE NUMBER:
RAW MWD
Curves and log
BIT RUN NUMBER:
DEPTH INCREMENT:
"
5
header data for each bit run in separate files.
4
.5000
.
FILE SUMMARY
VENDOR TOOL CODE
GR
RPX
FET
RPD
RPM
RPS
ROP
$
START DEPTH
13429.5
13442.0
13442.0
13442.0
13442.0
13442.0
13474.0
STOP DEPTH
13650.5
13663.0
13663.0
13663.0
13663.0
13663.0
13694.5
#
LOG HEADER DATA
DATE LOGGED:
SOFTWARE
SURFACE SOFTWARE VERSION:
DOWNHOLE SOFTWARE VERSION:
DATA TYPE (MEMORY OR REAL-TIME):
TD DRILLER (FT):
TOP LOG INTERVAL (FT):
BOTTOM LOG INTERVAL (FT):
BIT ROTATING SPEED (RPM):
HOLE INCLINATION (DEG
MINIMUM ANGLE:
MAXIMUM ANGLE:
#
TOOL STRING (TOP TO
VENDOR TOOL CODE
GM
EWR4
$
BOTTOM)
TOOL TYPE
Dual GR
ELECTROMAG.
RESIS. 4
#
BOREHOLE AND CASING DATA
OPEN HOLE BIT SIZE (IN):
DRILLER'S CASING DEPTH (FT):
#
BOREHOLE CONDITIONS
MUD TYPE:
MUD DENSITY (LB/G):
MUD VISCOSITY (S):
MUD PH:
MUD CHLORIDES (PPM):
FLUID LOSS (C3):
RESISTIVITY (OHMM) AT TEMPERATURE (DEGF)
MUD AT MEASURED TEMPERATURE (MT):
MUD AT MAX CIRCULATING TERMPERATURE:
MUD FILTRATE AT MT:
MUD CAKE AT MT:
#
NEUTRON TOOL
MATRIX:
MATRIX DENSITY:
HOI,E CORRECTION (IN):
#
TOOL STANDOFF (IN):
EWR FREQUENCY (HZ):
#
REMARKS:
$
#
Data Format Specification Record
Data Record Type.................. 0
Data Specification Block Type.....O
Logging Direction.................Down
Optical log depth units...........Feet
Data Reference Point..............Undefined
Frame Spacing..................... 60 .IIN
Max frames per record.............Undefined
Absent value...................... -999
Depth Units.......................
Datum Specification Block sub-type...O
Name Service Order
DEPT
ROP MWD040
GR MWD040
Units
FT
FT/H
API
Size
4
4
4
Nsam Rep
1 68
1 68
1 68
Code
.
28-0CT-03
Insite
4.3
Memory
13695.0
13473.0
13695.0
88.5
94.4
TOOL NUMBER
72829
126589
3.750
11558.0
Flo-Pro
8.60
60.0
9.0
19500
9.0
.180
.000
.280
.260
66.0
127.3
64.0
64.0
Offset
o
4
8
Channel
1
2
3
. .
RPX MWD040 OHMM 4 1 68 12 4
RPS MWD040 OHMM 4 1 68 16 5
RPM MWD040 OHMM 4 1 68 20 6
RPD MWD040 OHMM 4 1 68 24 7
FET MWD040 HOUR 4 1 68 28 8
First Last
Name Service Unit Min Max Mean Nsam Reading Reading
DEPT FT 13429.5 13694.5 13562 531 13429.5 13694.5
ROP MWD040 FT/H 1. 89 206.53 115.035 442 13474 13694.5
GR M';"iD040 API 45.61 66.6 56.1585 443 13429.5 13650.5
RPX MWD040 OHMM 14 .39 19.67 17 .1189 443 13442 13663
RPS MWD040 OHMM 15.76 23.08 19.0088 443 13442 13663
RPM MWD040 OHMM 16.09 25.04 19.788 443 13442 13663
RPD MWD040 OHMM 15.32 35.92 20.4 443 13442 13663
FET MWD040 HOUR 0.18 9.81 1. 87361 443 13442 13663
First Reading For Entire File..........13429.5
Last Reading For Entire File...........13694.5
File Trailer
Service name.............STSLIB.005
Service Sub Level Name...
Version Number...........l.0.0
Date of Generation.......04/01/22
Maximum Physical Record__65535
Fi 1 e Type................ LO
Next File Name...........STSLIB.006
Physical EOF
File Header
Service name.............STSLIB.006
Service Sub Level Name...
Version Number...........l.0.0
Date of Generation.......04/01/22
Maximum Physical Record..65535
File Type............... .LO
Previous File Name.......STSLIB.005
Comment Record
FILE HEADER
FILE NUMBER:
RAW MWD
Curves and log
BIT RUN NUMBER:
DEPTH INCREMENT:
II
FILE SUMMARY
VENDOR TOOL CODE
GR
FET
RPX
RPS
RPD
RPM
ROP
$
6
header data for each bit run in separate files.
5
.5000
START DEPTH
13651.0
13663.5
13663.5
13663.5
13663.5
13663.5
13695.0
STOP DEPTH
14270.0'
14270.0
14270.0
14270.0
14270.0
14270.0
14274.0
II
LOG HEADER DATA
DATE LOGGED:
SOFTWARE
SURFACE SOFTWARE VERSION:
DOWNHOLE SOFTWARE VERSION:
DATA TYPE (MEMORY OR REAL-TIME):
TD DRILLER (FT):
TOP LOG INTERVAL (FT):
BOTTOM LOG INTERVAL (FT):
BIT ROTATING SPEED (RPM):
30-0CT-03
Insite
4.3
Memory
14270.0
13695.0
14270.0
.
HOLE INCLINATION (DEG
MINIMUM ANGLE:
MAXIMUM ANGLE:
#
TOOL STRING (TOP TO
VENDOR TOOL CODE
GM
EWR4
$
BOTTOM)
TOOL TYPE
Dual GR
ELECTROMAG.
RESIS. 4
#
BOREHOLE AND CASING DATA
OPEN HOLE BIT SIZE (IN):
DRILLER'S CASING DEPTH (FT):
#
BOREHOLE CONDITIONS
MUD TYPE:
MUD DENSITY (LB/G):
MUD VISCOSITY (S):
MUD PH:
MUD CHLORIDES (PPM):
FLUID LOSS (C3):
RESISTIVITY (OHMM) AT TEMPERATURE (DEGF)
MUD AT MEASURED TEMPERATURE (MT):
MUD AT MAX CIRCULATING TERMPERATURE:
MUD FILTRATE AT MT:
MUD CAKE AT MT:
#
NEUTRON TOOL
MATRIX:
MATRIX DENSITY:
HOLE CORRECTION (IN):
#
TOOL STANDOFF (IN):
EWR FREQUENCY (HZ):
#
REMARKS:
$
#
Data Format Specification Record
Data Record Type.................. 0
Data Specification Block Type.....O
Logging Direction.................Down
Optical log depth units...........Feet
Data Reference Point..............Undefined
Frame Spacing..................... 60 .IIN
Max frames per record.............Undefined
Absent value...................... -999
Depth Units.......................
Datum Specification Block sub-type...O
85.2
93.7
TOOL NUMBER
72829
126589
3.750
13488.0
Flo Pro
8.60
45.0
9.0
19000
10.8
.180
.100
.280
.260
Name Service Order Units Size Nsam Rep Code Offset Channel
DEPT FT 4 1 68 0 1
ROP MWD050 FT/H 4 1 68 4 2
GR MWD050 API 4 1 68 8 3
RPX MWD050 OHMM 4 1 68 12 4
RPS MWD050 OHMM 4 1 68 16 5
RPM MWD050 OHMM 4 1 68 20 6
RPD MWD050 OHMM 4 1 68 24 7
FET MWD050 HOUR 4 1 68 28 8
Name
DEPT
ROP
GR
RPX
RPS
RPM
RPD
FET
Service Unit
FT
MWD050 FT/H
MVilD050 API
MWD050 OHMM
MWD050 OHMM
MWD050 OHMM
MVilD050 OHMM
MWD050 HOUR
Min
13651
0.2
39.11
15.11
16.95
17 .4
17.79
0.31
Max
14274
813.41
81. 58
29.27
30.09
29.88
39.47
8.93
First Reading For Entire File..........13651
Mean
13962.5
80.0502
58.725
20.0471
22.5753
23.5642
24.2228
1.76136
Nsam
1247
1159
1239
1214
1214
1214
1214
1214
.
66.0
126.0
64.0
64.0
First
Reading
13651
13695
13651
13663.5
13663.5
13663.5
13663.5
13663.5
Last
Reading
14274
14274
14270
14270
14270
14270
14270
14270
.
Last Reading For Entire File...........14274
File Trailer
Service name.............STSLIB.006
Service Sub Level Name...
Version Number...........1.0.0
Date of Generation.......04/01/22
Maximum Physical Record..65535
Fi 1 e Type................ LO
Next File Name...........STSLIB.007
Physical EOF
File Header
Service name.............STSLIB.007
Service Sub Level Name...
Version Number.......... .1.0.0
Date of Generation.......04/01/22
Maximum Physical Record..65535
Fi 1 e Type................ LO
Previous File Name.......STSLIB.006
Comment Record
FILE HEADER
FILE NUMBER:
RAW MWD
Curves and log
BIT RUN NUMBER:
DEPTH INCREMENT:
#
FILE SUMMARY
VENDOR TOOL CODE
GR
ROP
$
7
.
header data for each bit run in separate files.
6
.5000
START DEPTH
14270.5
14274.5
STOP DEPTH
14358.0
14392.0
#
LOG HEADER DATA '
D1\TE LOGGED:
SOFTWARE
SURFACE SOFTWARE VERSION:
DOWNHOLE SOFTWARE VERSION:
DATA TYPE (MEMORY OR REAL-TIME):
TD DRILLER (FT):
TOP LOG INTERVAL (FT):
BOTTOM LOG INTERVAL (FT):
BIT ROTATING SPEED (RPM):
HOLE INCLINATION (DEG
MINIMUM ANGLE:
MAXIMUM ANGLE:
#
TOOL STRING (TOP TO
VENDOR TOOL CODE
GM
$
BOTTOM)
TOOL TYPE
Dual GR
#
BOREHOLE AND CASING DATA
OPEN HOLE BIT SIZE (IN):
DRILLER'S CASING DEPTH (FT):
#
BOREHOLE CONDITIONS
MUD TYPE:
MUD DENSITY (LB/G):
MUD VISCOSITY (S):
MUD PH:
MUD CHLORIDES (PPM):
FLUID LOSS (C3):
RESISTIVITY (OHMM) AT TEMPERATURE (DEGF)
MUD AT MEASURED TEMPERATURE (MT):
MUD AT MAX CIRCULATING TERMPERATURE:
MUD FILTRATE AT MT:
MUD CAKE AT MT:
JI
31-0CT-03
Insite
4.3
Memory
14392.0
14270.0
14392.0
75.3
88.0
TOOL NUMBER
93091
3.750
13488.0
Flo-Pro
8.60
45.0
8.5
20100
8.6
.000
.000
.000
.000
.0
134.0
.0
.0
.
.
NEUTRON TOOL
MATRIX:
MATRIX DENSITY:
HOLE CORRECTION (IN):
#
TOOL STANDOFF (IN):
EWR FREQUENCY (HZ):
#
REMARKS:
$
#
Data Format Specification Record
Data Record T}lpe.......... . . . . . . . .0
Data Specification Block Type.....O
Logging Direction.................Down
Optical log depth units...........Feet
Data Reference Point..............Undefined
Frame Spacing. ............ ........60 .1IN
Max frames per record.............Undefined
Absent value...................... -999
Depth Units.......................
Datum Specification Block sub-type...O
Name
DEPT
ROP
GR
Service Order
Units
FT
FT/H
API
Size
4
4
4
Nsam
1
1
1
Rep
68
68
68
Code
Offset
o
4
8
Channel
1
2
3
MWD060
MWD060
First Last
Name Service Unit Min Max Mean Nsam Reading Reading
DEPT FT 14270.5 14392 14331.3 244 14270.5 14392
ROP MWD060 FT/H 0.42 378.35 77.9085 236 14274.5 14392
GR MWD060 API 49.58 88.74 69.9106 176 14270.5 14358
First Reading For Entire File..........14270.5
Last Reading For Entire File...........14392
File Trailer
Service name.............STSLIB.007
Service Sub Level Name...
Version Number...........1.0.0
Date of Generation.......04/01/22
Maximum Physical Record..65S3S
File Type................ LO
Next File Name...........STSLIB.008
Physical EOF
File Header
Service name.............STSLIB.008
Service Sub Level Name...
Version Number...........1.0.0
Date of Generation.......04/01/22
Maximum Physical Record..65535
Fi 1 e Type................ LO
Previous File Name.......STSLIB.007
Comment Record
FILE HEADER
FILE NUMBER:
RAW MWD
Curves and log header data for each bit run in separate files.
BIT RUN NUMBER: 7
DEPTH INCREMENT:
#
FILE SUMMARY
VENDOR TOOL CODE
RPD
RPM
8
.5000
START DEPTH
14270.5
14270.S
STOP DEPTH
14943.0
14943.0
.
RPS
RPX
FET
GR
ROP
$
14270.5
14270.5
14270.5
14358.5
14392.5
14943.0
14943.0
14943.0
14931. 0
14981.0
#
LOG HEADER DATA
DATE LOGGED:
SOFTWARE
SURFACE SOFTWARE VERSION:
DOWNHOLE SOFTWARE VERSION:
DATA TYPE (HEHORY OR REAL-TIHE):
'I'D DRILLER (FT):
TOP LOG INTERVAL (FT):
BOTTOM LOG INTERVAL (FT):
BIT ROTATING SPEED (RPM}=
HOLE INCLINATION (DEG
MINIMUM ANGLE:
MAXIMUM ANGLE:
#
TOOL STRING (TOP TO
VENDOR TOOL CODE
GM
EWR4
$
BOTTOM)
TOOL TYPE
Dual GR
ELECTROMAG.
RESIS. 4
#
BOREHOLE AND CASING DATA
OPEN HOLE BIT SIZE (IN):
DRILLER'S CASING DEPTH (FI'):
#
BOREHOLE CONDITIONS
MUD TYPE:
MUD DENSITY {LB!G}:
MUD VISCOSITY (S):
MUD PH:
MUD CHLORIDES (PPM):
FLUID LOSS (C3):
RESISTIVITY (OHMM) AT TEMPERATURE (DEGF)
MUD AT MEASURED TEMPERATURE (MT):
MUD AT MAX CIRCULATING TERMPERATURE:
MUD FILTRATE AT MT:
MUD CAKE A'l' MT:
#
NEUTRON TOOL
MATRIX:
HATRIX DENSITY:
HOLE CORRECTION (IN):
#
TOOL STANDOFF (IN):
Evffi FREQUENCY (HZ}:
#
REMARKS:
$
#
Data Format Specification Record
Data Record Type..................O
Data Specification Block Type.....O
Logging Direction.................Down
Optical log depth units...........Feet
Data Reference Point..............Undefined
Frame Spacing..................... 60 .1IN
Max frames per record.............Undefined
Absent value..................... .-999
Depth Units.......................
Datum Specification Block sub-type...O
.
02-NOV-03
Insite
4.3
Memory
14980.0
14392.0
14980.0
75.3
92.5
TOOL NUMBER
72829
126589
3.750
13488.0
Flo-Pro
8..60
50.0
8.5
20000
6.8
.320
.191
.250
.290
78.0
135.3
73.0
62.0
Name Service Order Units Size Nsam Rep Code Offset Channel
DEPT FT 4 1 68 0 1
ROP MWD070 FT/H 4 1 68 4 2
GR MWD070 API 4 1 68 8 3
RPX !on-m070 OHMM 4 1 68 12 4
RPS MWD070 OHMM 4 1 68 16 5
RPM MWD070 OHMM 4 1 68 20 6
RPD MWD070 OHMM 4 1 68 24 7
. .
FET MWDOiO HOUR 4 1 be 28 8
First Last
Name Service Unit Min Max Mean Nsam Reading Reading
DEPT FT 14270.5 14981 14625.8 1422 14270.5 14981
ROP MWD070 FT/H 0 1688.79 98.0924 1178 14392.5 14 981
GR MWD070 API 48.23 140.67 81,,9167 11'16 1 435'i:L 5 14931
RPX MWD070 OHMM 5.95 26.27 11.9558 1346 14270.5 14943
RPS MWD070 OHMM 6.1 28.21 13.8687 1346 14270.5 14943
RPM MWD070 OHMM 6.33 30.08 14.9718 1346 14270.5 14943
RPD OHt4M .3':5 16~1671 1-.:i4Ô 14270.5 14943
FET MWD070 HOUR 0.38 63.04 6.51575 1346 14270.5 14943
First Reading For Entire File~"""".4"..14270.5
Last Reading For Entire File...........14981
File Trailer
Service name.............STSLIB.008
Service Sub Level Name...
Version Nurnber...........l.O.O
Date of Generation.......04/01/22
Maximum Physical Record..65535
File Type............... .LO
Next File Name...........STSLIB.009
Physical EOf'
Tape Trailer
Service name.............LISTPE
Date.... .................04/01/22
Origin. . . . . . . . . . . . . . . . . . . STS
Tape Name........... _. _. . UNKNOWN
Continuation Number......01
Next Tape Name...........UNKNOWN
Comments.................STS LIS Writing Library. Scientific Technical Services
Reel Trailer
Service name.............LISTPE
Date..... ................04/01/22
Origin.................. .STS
Reel Name......._.._.....UNKNOWN
Continuation NUIT~er..~...Ol
Next Reel Name...........UNKNOWN
Comments.................STS LIS Writing Library. Scientific Technical Services
Physical EOF
Physical EOF
End Of LIS File
.
(~O-3 - l co C.Ð
.
~ \ 1]/rt
Sperry-Sun Drilling Services
LIS Scan Utility
$Revision: 3 $
LisLib $Revision: 4 $
Tue Feb 10 10:32:18 2004
Reel Header
Service name.............LISTPE
Da t e . . . . . . . . . . . . . . . . . . . . . 04/ 02!1 0
Origin. . . . . . . . . . . . . . . . . . . STS
Reel Name................UNKNOWN
Continuation Number......Ol
Previous Reel Name.......UNKNOWN
Comments.................STS LIS Writing Library. Scientific Technical Services
Tape Header
Service name.............LISTPE
Date.....................04/02/10
Origin. . . . . . . . . . . . . . . . . . . STS
Tape Name................UNKNOWN
Continuation Number......01
Previous Tape Name.......UNKNOWN
Comments.................STS LIS Writing Library. Scientific Technical Services
Physical EOF
Comment Record
TAPE HEADER
Prudhoe Bay
MWD/MAD LOGS
#
WELL NAME:
API NUMBER:
OPERATOR:
LOGGING COMPANY:
TAPE CREATION DATE:
#
JOB DATA
S-102L1 PB1
500292297271
BP Exploration (Alaska)
Sperry-Sun Drilling Services
21-JAN-04
JOB NUMBER:
LOGGING ENGINEER:
OPERATOR WITNESS:
MWD RUN 1
MW0002737220
C. ASUCHAK
R. WHITLOW,
MWD RUN 2
MW0002737220
C. ASUCHAK
R. WHITLOW
MWD RUN 3
MW0002737220
C. ASUCHAK
R. WHITLOW
JOB NUMBER:
LOGGING ENGINEER:
OPERATOR WITNESS:
MWD RUN 4
MW0002737220
B. JAHN
R. WHITLOW /
MWD RUN 5
MW0002737220
B. JAHN
J. EGBEJIMBA
#
SURFACE LOCATION
SECTION:
TOWNSHIP:
RANGE:
FNL:
FSL:
FEL:
FWL:
ELEVATION (FT FROM MSL 0)
KELLY BUSHING:
DERRICK FLOOR:
GROUND LEVEL:
35
12N
12E
4452
4499
RECEIVED
64.20
.00
.00
r: ~~:) 1 C} ~n¡).:1
! "..j . '--" ~
#
WELL CASING RECORD
1ST STRING
2ND STRING
3RD STRING
PRODUCTION STRING
OPEN HOLE CASING DRILLERS
BIT SIZE (IN) SIZE (IN) DEPTH (FT)
3.750 4.500 11558.0
1\Ð$~3\ Oil III Gas Cons, Commision
¡0,\;cl:!'I"~(ð
. ,L "E/~n:Q~~
#
REMARKS:
~<c..,· ., ~
'" bDì\\0
.
.
1. THESE DATA ARE REISSUED DUE TO AN INCORRECT API
NUMBER IN THE
ORIGINAL DATASET.
2. ALL DEPTHS ARE BIT DEPTHS UNLESS OTHERWISE NOTED.
THESE DEPTHS ARE
MEASURED DEPTH (MD).
3. ALL VERTICAL DEPTHS ARE TRUE VERTICAL DEPTH - SUBSEA
(TVDSS) .
4. THIS WELLBORE, AN OPEN HOLE SIDETRACK, EXITS THE
MAIN S-102Ll WELLBORE
AT 14270'MD/6743'TVD.
5. MWD RUNS 1 AND 2 COMPRISED DIRECTIONAL AND DUAL
GAMMA RAY (GM). RUN 1
ALSO INCLUDED PRESSURE WHILE DRILLING (PWD).
6. MWD RUNS 3 - 5 COMPRISED DIRECTIONAL WITH GM; AND
ELECTROMAGNETIC WAVE
RESISTIVITY PHASE-4 (EWR4).
7. LOG AND MERGED DIGITAL DATA (LDWG) ONLY WERE SHIFTED
TO A REEVES GAMMA
RAY RUN IN S-102 Ll ON 11/2/03. THESE DATA WERE
PROVIDED TO SSDS BY K.
COONEY, SIS, ON 1/13/04. LOG HEADER DATA RETAIN
ORIGINAL DRILLERS'
DEPTH REFERENCES.
8. MWD RUNS 1 - 5 REPRESENT WELL S-102L1 PB1 WITH API#:
50-029-22972-71.
THIS WELL REACHED A TOTAL DEPTH (TD) OF
14434'MD/6756'TVDSS.
SROP SMOOTHED RATE OF PENETRATION WHILE DRILLING.
SGRC SMOOTHED GAMMA RAY COMBINED.
SEXP SMOOTHED PHASE SHIFT-DERIVED RESISTIVITY (EXTRA
SHALLOW SPACING) .
SESP = SMOOTHED PHASE
SPACING) .
SEMP = SMOOTHED PHASE
SPACING) .
SEDP = SMOOTHED PHASE
SPACING) .
SFXE = SMOOTHED FORMATION EXPOSURE TIME.
$
SHIFT-DERIVED RESISTIVITY ( SHALLOW
SHIFT-DERIVED RESISTIVITY (MEDIUM
SHIFT-DERIVED RESISTIVITY (DEEP
File Header
Service name.............STSLIB.001
Service Sub Level Name...
Version Number...........1.0.0
Date of Generation.......04/02/10
Maximum Physical Record..65535
File Type................ LO
Previous File Name.......STSLIB.OOO
Comment Record
FILE HEADER
FILE NUMBER:
EDITED MERGED MWD
Depth shifted
DEPTH INCREMENT:
#
FILE SUMMARY
PBU TOOL CODE
GR
FET
RPD
RPM
RPS
RPX
ROP
1
and clipped curves; all bit runs merged.
.5000
START DEPTH
11627.0
12824.5
12824.5
12824.5
12824.5
12824.5
12842.0
STOP DEPTH
14384.0
14396.5
14396.5
14396.5
14396.5
14396.5
14428.5
· .
#
BASELINE CURVE FOR SHIFTS:
CURVE SHIFT DATA (MEASURED DEPTH)
--------- EQUIVALENT UNSHIFTED DEPTH ---------
BASELINE DEPTH
11627.0
11628.5
11631. 5
11635.0
11639.5
11642.0
11648.5
11650.5
11660.5
11669.0
11670.5
11673.0
12814.5
12816.5
12826.0
12831. 5
12836.0
12838.0
12840.0
12851. 5
12860.0
12866.0
12885.0
12900.0
12905.5
12911.5
12915.5
12916.5
12920.5
12923.5
12932.0
12942.0
12945.5
12947.5
12952.5
12960.5
12965.5
12972.0
12973.5
12981.0
12989.0
12995.0
12999.5
13010.0
13012.0
13019.5
13023.5
13030.5
13042.0
13050.5
13053.0
13056.5
13065.5
13079.0
13087.0
13096.0
13102.5
13107.5
1311 7.0
13120.0
13126.0
13133.5
13135. 0
13139.0
13145.0
13151. 5
13153.0
13164.5
13170.0
13180.0
GR
11625.5
11627.0
11631. 0
11634.5
11639.0
11641. 5
11647.0
11650.5
11658.0
11667.0
11669.0
11670.5
12814.5
12817.0
12826.0
12830.5
12835.0
12837.0
12840.0
12855.0
12862.5
12868.5
12889.5
12906.0
12910.0
12916.5
12920.0
12921.0
12924.0
12928.5
12936.5
12943.0
12948.5
12950.0
12956.0
12962.0
12968.0
12973.0
12974.5
12984.5
12994.5
12999.0
13002.5
13013.5
13014.5
13022.5
13026.0
13030.5
13039.5
13049.0
13051. 5
13056.0
13065.0
13082.0
13087.5
13096.0
13102.5
13107.0
13116.0
13119.0
13124.0
13133.0
13134.5
13138.0
13144.5
13150.5
13152.5
13164.5
13172.0
13181. 5
.
.
13183.5
13195.0
13217.0
13227.5
13237.0
13245.5
13254.5
13262.5
13269.0
13275.0
13317.5
13326.5
13357.5
13379.0
13384.5
13390.0
13396.0
13408.0
13418.5
13432.0
13440.0
13450.0
13478.0
13488.0
13501. 0
13522.0
13527.0
13550.0
13563.5
13572.0
13583.5
13597.5
13612.0
13619.5
13626.0
13643.5
13649.5
13656.5
13671.5
13676.5
13698.5
13706.0
13708.0
13722.0
13736.5
13742.0
13744. 0
13749.5
13794.0
13808.0
13841.0
13843.0
13874.5
13888.5
13909.5
13928.0
13937.5
13947.5
13964.0
13974.0
13988.5
14000.0
14004.0
14010.5
14019.5
14072.5
14084.0
14112.5
14121.5
14167.0
14174.0
14183.0
14199.5
14218.0
14226.0
13185.0
13196.5
13216.5
13228.0
13237.0
13246.5
13256.0
13263.0
13269.5
13276.0
13317.0
13326.0
13357.0
13378.5
13385.5
13390.5
13396.0
13409.0
13419.0
13432.0
13440.0
13449.5
13477.5
13488.0
13501. 5
13521.5
13528.0
13551. 5
13564.5
13573.0
13585.0
13599.0
13612.5
13618.0
13625.5
13643.0
13648.0
13655.5
13669.0
13674.0
13696.0
13706.0
13707.5
13722.5
13735.5
13742.0
13743.0
13750.0
13793.0
13808.5
13841.0
13843.0
13874.0
13888.5
13908.0
13927.5
13936.0
13945.5
13965.0
13972.5
13988.5
13999.0
14005.5
14012.0
14020.0
14075.5
14085.5
14115.5
14123.0
14170.0
14176.0
14185.0
14201.0
14217.5
14225.5
·
Ie
14231. 0
14235.5
14243.5
14255.5
14264.0
14428.5
$
14230.0
14236.0
14244.0
14256.5
14266.5
14431.0
#
MERGED DATA SOURCE
PBU TOOL CODE
MWD
MWD
MWD
MWD
MWD
$
BIT RUN NO
1
2
3
4
5
MERGE TOP
11625.5
13010.5
13296.0
13473.5
13694.5
MERGE BASE
13010.5
13296.0
13473.5
13694.5
14431.0
#
REMARKS:
MERGED MAIN PASS.
$
#
Data Format Specification Record
Data Record Type..................O
Data Specification Block Type.....O
Logging Direction................ . Down
Optical log depth units...........Feet
Data Reference Point..............Undefined
Frame Spacing..................... 60 .1IN
Max frames per record.............Undefined
Absent value..................... .-999
Dept.h Units.......................
Datum Specification Block sub-type...O
Name Service Order Units Size Nsam Rep Code Offset Channel
DEPT FT 4 1 68 0 1
ROP MWD FT/H 4 1 68 4 2
GR MWD API 4 1 68 8 3
RPX MWD OHMM 4 1 68 12 4
RPS MWD OHMM 4 1 68 16 5
RPM MWD OHMM 4 1 68 20 6
RPD MWD OHMM 4 1 68 24 7
FET MWD HOUR 4 1 68 28 8
First Last
Name Service Unit Min Max Mean Nsam Reading Reading
DEPT FT 11627 14428.5 13027.8 5604 11627 14428.5
ROP MWD FT/H 0.05 1426.82 73.9666 3174 12842 14428.5
GR MWD API 39.11 447.59 67.1331 3242 11627 14384
RPX MWD OHMM 0.63 2000 22.3046 3145 12824.5 14396.5
RPS MWD OHMM 0.66 2000 25.34 3145 12824.5 14396.5
RPM MWD OHMM 0.93 2000 22.9055 3145 12824.5 14396.5
RPD MWD OHMM 2.42 2000 29.0463 3145 12824.5 14396.5
FET MWD HOUR 0.18 33.96 7.00879 3145 12824.5 14396.5
First Reading For Entire File..........11627
Last Reading For Entire File...........14428.5
File Trailer
Service name.............STSLIB.OOl
Service Sub Level Name...
Version Number...........1.0.0
Date of Generation.......04/02/10
Maximum Physical Record..65535
File Type............... .LO
Next File Name...........STSLIB.002
Physical EOF
File Header
Service name.............STSLIB.002
·
Service Sub Level Name...
Version Number...........l.0.0
Date of Generation.......04/02/10
Maximum Physical Record..65535
File Type................ LO
Previous File Name.......STSLIB.OOl
Comment Record
FILE HEADER
FILE NUMBER:
RAW MWD
Curves and log
BIT RUN NUMBER:
DEPTH INCREMENT:
#
FILE SUMMARY
VENDOR TOOL CODE
GR
ROP
$
2
header data for each bit run
1
.5000
START DEPTH
11625.5
12842.5
STOP DEPTH
12983.5
13010.5
#
LOG HEADER DATA
DATE LOGGED:
SOFTWARE
SURFACE SOFTWARE VERSION:
DOWNHOLE SOFTWARE VERSION:
DATA TYPE (MEMORY OR REAL-TIME):
TD DRILLER (FT):
TOP LOG INTERVAL (FT):
BOTTOM LOG INTERVAL (FT):
BIT ROTATING SPEED (RPM):
HOLE INCLINATION (DEG
MINIMUM ANGLE:
MAXIMUM ANGLE:
#
TOOL STRING (TOP TO
VENDOR TOOL CODE
GM
$
BOTTOM)
TOOL TYPE
Dual GR
#
BOREHOLE AND CASING DATA
OPEN HOLE BIT SIZE (IN):
DRILLER'S CASING DEPTH (FT):
#
BOREHOLE CONDITIONS
MUD TYPE:
MUD DENSITY (LB/G):
MUD VISCOSITY (S):
MUD PH:
MUD CHLORIDES (PPM):
FLUID LOSS (C3):
RESISTIVITY (OHMM) AT TEMPERATURE (DEGF)
MUD AT MEASURED TEMPERATURE (MT):
MUD AT MAX CIRCULATING TERMPERATURE:
MUD FILTRATE AT MT:
MUD CAKE AT MT:
#
NEUTRON TOOL
MATRIX:
MATRIX DENSITY:
HOLE CORRECTION (IN):
#
TOOL STANDOFF (IN):
EWR FREQUENCY (HZ):
#
REMARKS:
$
#
Data Format Specification Record
Data Record Type................. . 0
Data Specification Block Type.....O
Logging Direction.................Down
Optical log depth units...........Feet
Data Reference Point..............Undefined
Frame Spacing.....................60 .1IN
,e
in separate files.
26-0CT-03
Insite
4.3
Memory
13010.0
12827.0
13010.0
64.0
82.5
TOOL NUMBER
93091
4.125
11558.0
Flo Pro
8.60
50.0
9.0
21000
8.8
.000
.000
.000
.000
.0
131.0
.0
.0
.
.
Max frames per record.............Undefined
Absent value..................... .-999
Depth Uni ts. . . . . . . . . . . . . . . . . . . . . . .
Datum Specification Block sub-type...O
Service Order
Units
FT
FT/H
API
Size
4
4
4
Code
Offset
o
4
8
Channel
1
2
3
Name
DEPT
ROP
GR
MWDOI0
MWD010
Nsam
1
1
1
Rep
68
68
68
First Last
Name Service Unit Min Max Mean Nsam Reading Reading
DEPT FT 11625.5 13010.5 12318 2771 11625.5 13010.5
ROP MWD010 FT/H 1.17 118.47 46.653 337 12842.5 13010.5
GR MWD010 API 40.13 447.59 86.2039 439 11625.5 12983.5
First Reading For Entire File..........1162S.S
Last Reading For Entire File...........13010.S
File Trailer
Service name.............STSLIB.002
Service Sub Level Name...
Version Number...........1.0.0
Date of Generation.......04/02/10
Maximum Physical Record..65535
File Type................ LO
Next File Name...........STSLIB.003
Physical EOF
File Header
Service name.............STSLIB.003
Service Sub Level Name...
Version Nurnber...........1.0.0
Date of Generation.......04/02/10
Maximum Physical Record..65535
File Type............... .LO
Previous File Name.......STSLIB.002
Comment Record
FILE HEADER
FILE NUMBER:
RAW MWD
Curves and log
BIT RUN NUMBER:
DEPTH INCREMENT:
#
FILE SUMMARY
VENDOR TOOL CODE
GR
ROP
$
3
header data for each bit run in separate files.
2
.5000
START DEPTH
12984.0
13011. 0
STOP DEPTH
13269.0
13296.0
#
LOG HEADER DATA
DATE LOGGED:
SOFTWARE
SURFACE SOFTWARE VERSION:
DOWNHOLE SOFTWARE VERSION:
DATA TYPE (MEMORY OR REAL-TIME):
TD DRILLER (FT):
TOP LOG INTERVAL (FT):
BOTTOM LOG INTERVAL (FT):
BIT ROTATING SPEED (RPM):
HOLE INCLINATION (DEG
MINIMUM ANGLE:
MAXIMUM ANGLE:
27-0CT-03
Insite
4.3
Memory
13300.0
13010.0
13300.0
79.1
92.0
#
TOOL STRING (TOP TO BOTTOM)
VENDOR TOOL CODE TOOL TYPE
TOOL NUMBER
.
GM
$
Dual GR
#
BOREHOLE AND CASING DATA
OPEN HOLE BIT SIZE (IN):
DRILLER'S CASING DEPTH (FT):
#
BOREHOLE CONDITIONS
MUD TYPE:
MUD DENSITY (LB/G):
MUD VISCOSITY (S):
MUD PH:
MUD CHLORIDES (PPM):
FLUID LOSS (C3):
RESISTIVITY (OHMM) AT TEMPERATURE (DEGF)
MUD AT MEASURED TEMPERATURE (MT):
MUD AT MAX CIRCULATING TERMPERATURE:
MUD FILTRATE AT MT:
MUD CAKE AT MT:
#
NEUTRON TOOL
MATRIX:
MATRIX DENSITY:
HOLE CORRECTION (IN):
#
TOOL STANDOFF (IN):
EWR FREQUENCY (HZ):
#
REMARKS:
$
#
Data Format Specification Record
Data Record Type.................. 0
Data Specification Block Type.....O
Logging Direction.................Down
Optical log depth units...........Feet
Data Reference Point..............Undefined
Frame Spacing..................... 60 .1IN
Max frames per record.............Undefined
Absent value..................... .-999
Depth Units.......................
Datum Specification Block sub-type...O
.
72829
4.125
11558.0
Fl0 Pro
8.60
.0
9.2
21000
.0
.000
.000
.000
.000
.0
120.0
.0
.0
Name Service Order
DEPT
ROP MWD020
GR MWD020
Units
FT
FT/H
API
Size Nsam Rep Code Offset Channel
4 1 68 0 1
4 1 68 4 2
4 1 68 8 3
First Last
Name Service Unit Min Max Mean Nsam Reading Reading
DEPT FT 12984 13296 13140 625 12984 13296
ROP MWD020 FT/H 1.11 102.06 48.1151 571 13011 13296
GR MWD020 API 44.44 131. 51 84.2569 571 12984 13269
First Reading For Entire File..........12984
Last Reading For Entire File...........13296
File Trailer
Service name.............STSLIB.003
Service Sub Level Name...
Version Number...........1.0.0
Date of Generation.......04/02/10
Maximum Physical Record..65535
File Type................ LO
Next File Name...........STSLIB.004
Physical EOF
File Header
.
Service name.............STSLIB.004
Service Sub Level Name...
Version Number...........1.0.0
Date of Generation.......04/02/10
Maximum Physical Record..65535
File Type................ LO
Previous File Name.......STSLIB.003
Comment Record
FILE HEADER
FILE NUMBER:
RAW MWD
Curves and log
BIT RUN NUMBER:
DEPTH INCREMENT:
#
FILE SUMMARY
VENDOR TOOL CODE
RPS
FET
RPD
RPX
RPM
GR
ROP
$
4
.
header data for each bit run in separate files.
3
.5000
START DEPTH
12824.5
12824. 5
12824.5
12824.5
12824.5
13269.5
13296.5
STOP DEPTH
13441.5
13441.5
13441.5
13441.5
13441.5
13429.0
13473.5
#
LOG HEADER DATA
DATE LOGGED:
SOFTWARE
SURFACE SOFTWARE VERSION:
DOWNHOLE SOFTWARE VERSION:
DATA TYPE (MEMORY OR REAL-TIME):
TD DRILLER (FT):
TOP LOG INTERVAL (FT):
BOTTOM LOG INTERVAL (FT):
BIT ROTATING SPEED (RPM):
HOLE INCLINATION (DEG
MINIMUM ANGLE:
MAXIMUM ANGLE:
#
TOOL STRING (TOP TO
VENDOR TOOL CODE
GM
EWR4
$
BOTTOM)
TOOL TYPE
Dual GR
ELECTROMAG.
RESIS. 4
#
BOREHOLE AND CASING DATA
OPEN HOLE BIT SIZE (IN):
DRILLER'S CASING DEPTH (FT):
#
BOREHOLE CONDITIONS
MUD TYPE:
MUD DENSITY (LB/G):
MUD VISCOSITY (S):
MUD PH:
MUD CHLORIDES (PPM):
FLUID LOSS (C3):
RESISTIVITY (OHMM) AT TEMPERATURE (DEGF)
MUD AT MEASURED TEMPERATURE (MT):
MUD AT MAX CIRCULATING TERMPERATURE:
MUD FILTRATE AT MT:
MUD CAKE AT MT:
#
NEUTRON TOOL
MATRIX:
MATRIX DENSITY:
HOLE CORRECTION (IN):
#
TOOL STANDOFF (IN):
EWR FREQUENCY (HZ):
#
REMARKS:
"
28-0CT-03
Insite
4.3
Memory
13473.0
13300.0
13473.0
89.1
91.2
TOOL NUMBER
82758
126589
3.750
11558.0
F1o-Pro
8.60
60.0
9.0
19500
9.2
.000
.000
.000
.000
.0
116.0
.0
.0
.
.
Data Format Specification Record
Data Record Type..................O
Data Specification Block Type.....O
Logging Direction.................Down
Optical log depth units...........Feet
Data Reference Point..............Undefined
Frame Spacing..................... 60 .IIN
Max frames per record.............Undefined
Absent value......................-999
Depth Units.... . . . . . . . . . . . . . . . . . . .
Datum Specification Block sub-type...O
Name Service Order Units Size Nsam Rep Code Offset Channel
DEPT FT 4 I 68 0 1
ROP MWD030 FT/H 4 1 68 4 2
GR MWD030 API 4 1 68 8 3
RPX MWD030 OHMM 4 1 68 12 4
RPS MWD030 OHMM 4 1 68 16 5
RPM MWD030 OHMM 4 1 68 20 6
RPD MWD030 OHMM 4 1 68 24 7
FET MWD030 HOUR 4 1 68 28 8
First Last
Name Service Unit Min Max Mean Nsam Reading Reading
DEPT FT 12824.5 13473.5 13149 1299 12824.5 13473.5
ROP MWD030 FT/H 0.73 125.82 71.537 355 13296.5 13473.5
GR MWD030 API 49.42 73.61 61. 5956 320 13269.5 13429
RPX MWD030 OHMM 0.63 2000 23.9811 1235 12824.5 13441.5
RPS MWD030 OHMM 0.66 2000 28.2106 1235 12824.5 13441.5
RPM MWD030 OHMM 0.93 2000 21.9342 1235 12824.5 13441.5
RPD MWD030 OHMM 2.42 2000 34.598 1235 12824.5 13441.5
FET MWD030 HOUR 0.38 33.96 15.2744 1235 12824.5 13441.5
First Reading For Entire File..........12824.5
Last Reading For Entire File...........13473.5
File Trailer
Service name.............STSLIB.004
Service Sub Level Name...
Version Nu~ber...........1.0.0
Date of Generation.......04/02/10
Maximum Physical Record..65535
File Type.............. ..LO
Next File Name...........STSLIB.005
Physical EOF
File Header
Service name.............STSLIB.005
Service Sub Level Name...
Version Number...........1.0.0
Date of Generation.......04/02/10
Maximum Physical Record..65535
File Type............... .LO
Previous File Name.......STSLIB.004
Comment Record
FILE HEADER
FILE NUMBER:
RAW MWD
Curves and log
BIT RUN NUMBER:
DEPTH INCREMENT:
#
FILE SUMMARY
VENDOR TOOL CODE
GR
RPX
RPS
5
header data for each bit run in separate files.
4
.5000
START DEPTH
13429.5
13442.0
13442.0
STOP DEPTH
13650.5
13663.0
13663.0
.
RPM
FET
RPD
ROP
$
13442.0
13442.0
13442.0
13474.0
13663.0
13663.0
13663.0
13694.5
#
LOG HEADER DATA
DATE LOGGED:
SOFTWARE
SURFACE SOFTWARE VERSION:
DOWNHOLE SOFTWARE VERSION:
DATA TYPE (MEMORY OR REAL-TIME):
TD DRILLER (FT):
TOP LOG INTERVAL (FT):
BOTTOM LOG INTERVAL (FT):
BIT ROTATING SPEED (RPM):
HOLE INCLINATION (DEG
MINIMUM ANGLE:
MAXIMUM ANGLE:
#
TOOL STRING (TOP TO
VENDOR TOOL CODE
GM
EWR4
$
BOTTOM)
TOOL TYPE
Dual GR
ELECTROMAG.
RESIS. 4
if
BOREHOLE AND CASING DATA
OPEN HOLE BIT SIZE (IN):
DRILLER'S CASING DEPTH (FT):
if
BOREHOLE CONDITIONS
MUD TYPE:
MUD DENSITY (LB/G):
MUD VISCOSITY (S):
MUD PH:
MUD CHLORIDES (PPM):
FLUID LOSS (C3):
RESISTIVITY (OHMM) AT TEMPERATURE (DEGF)
MUD AT MEASURED TEMPERATURE (MT):
MUD AT MAX CIRCULATING TERMPERATURE:
MUD FILTRATE AT MT:
MUD CAKE AT MT:
if
NEUTRON TOOL
MATRIX:
MATRIX DENSITY:
HOLE CORRECTION (IN):
if
TOOL STANDOFF (IN):
EWR FREQUENCY (HZ):
#
REMARKS:
$
if
Data Format Specification Record
Data Record Type.................. 0
Data Specification Block Type.....O
Logging Direction.................Down
Optical log depth units...........Feet
Data Reference Point..............Undefined
Frame Spacing..... ................60 .1IN
Max frames per record.............Undefined
Absent value..................... .-999
Depth Uni ts . . . . . . . . . . . . . . . . . . . . . . .
Datum Specification Block sub-type...O
.
28-0CT-03
Insite
4.3
Memory
13695.0
13473.0
13695.0
88.5
94.4
TOOL NUMBER
72829
126589
3.750
11558.0
Flo-pro
8.60
60.0
9.0
19500
9.0
.180
.000
.280
.260
66.0
127.3
64.0
64.0
Name Service Order Units Size Nsam Rep Code Offset Channel
DEPT FT 4 1 68 0 1
ROP MWD040 FT/H 4 1 68 4 2
GR MWD040 API 4 1 68 8 3
RPX MWD040 OHMM 4 1 68 12 4
RPS MWD040 OHMM 4 1 68 16 5
RPM MWD040 OHMM 4 1 68 20 6
RPD MWD040 OHMM 4 1 68 24 7
FET MWD040 HOUR 4 1 68 28 8
.
.
First Last
Name Service Unit Min Max Mean Nsam Reading Reading
DEPT FT 13429.5 13694.5 13562 531 13429.5 13694.5
ROP MWD040 FT/H 1. 89 206.53 115.035 442 13474 13694.5
GR MWD040 API 45.61 66.6 56.1585 443 13429.5 13650.5
RPX MWD040 OHMM 14.39 19.67 17.1189 443 13442 13663
RPS MWD040 OHMM 15.76 23.08 19.0088 443 13442 13663
RPM MWD040 OHMM 16.09 25.04 19.788 443 13442 13663
RPD MWD040 OHMM 15.32 35.92 20.4 443 13442 13663
FET MWD040 HOUR 0.18 9.81 1. 87361 443 13442 13663
First Reading For Entire File..........13429.5
Last Reading For Entire File...........13694.5
File Trailer
Service name.............STSLIB.005
Service Sub Level Name...
Version Number...........1.0.0
Date of Generation.......04/02/10
Maximum Physical Record..65535
File Type............... .LO
Next File Name...........STSLIB.006
Physical EOF
File Header
Service name.............STSLIB.006
Service Sub Level Name...
Version Number...........1.0.0
Date of Generation.......04/02/10
Maximum Physical Record..65535
File Type............... .LO
Previous File Name.......STSLIB.005
Comment Record
FILE HEADER
FILE NUMBER:
RAW MWD
Curves and log
BIT RUN NUMBER:
DEPTH INCREMENT:
#
FILE SUMMARY
VENDOR TOOL CODE
GR
RPD
RPM
RPS
RPX
FET
ROP
$
6
header data for each bit run in separate files.
5
.5000
START DEPTH
13651. 0
13663.5
13663.5
13663.5
13663.5
13663.5
13695.0
STOP DEPTH
14386.5
14399.0
14399.0
14399.0
14399.0
14399.0
14431.0
#
LOG HEADER DATA
DATE LOGGED:
SOFTWARE
SURFACE SOFTWARE VERSION:
DOWNHOLE SOFTWARE VERSION:
DATA TYPE (MEMORY OR REAL-TIME):
TD DRILLER (FT):
TOP LOG INTERVAL (FT):
BOTTOM LOG INTERVAL (FT):
BIT ROTATING SPEED (RPM):
HOLE INCLINATION (DEG
MINIMUM ANGLE:
MAXIMUM ANGLE:
30-0CT-03
Insite
4.3
Memory
14434.0
13695.0
14434.0
85.2
93.7
#
TOOL STRING (TOP TO BOTTOM)
.
VENDOR TOOL CODE
GM
EWR4
$
TOOL TYPE
Dual GR
ELECTROMAG. RESIS. 4
#
BOREHOLE AND CASING DATA
OPEN HOLE BIT SIZE (IN):
DRILLER'S CASING DEPTH (FT):
#
BOREHOLE CONDITIONS
MUD TYPE:
MUD DENSITY (LB/G):
MUD VISCOSITY (S):
MUD PH:
MUD CHLORIDES (PPM):
FLUID LOSS (C3):
RESISTIVITY (OHMM) AT TEMPERATURE (DEGF)
MUD AT MEASURED TEMPERATURE (MT):
MUD AT MAX CIRCULATING TERMPERATURE:
MUD FILTRATE AT MT:
MUD CAKE AT MT:
#
NEUTRON TOOL
MATRIX:
MATRIX DENSITY:
HOLE CORRECTION (IN):
#
TOOL STANDOFF (IN):
EWR FREQUENCY (HZ):
#
REMARKS:
$
#
Data Format Specification Record
Data Record Type.................. 0
Data Specification Block Type.....O
Logging Direction.................Down
Optical log depth units...........Feet
Data Reference Point..............Undefined
Frame Spacing..................... 60 .1IN
Max frames per record.............Undefined
Absent value..................... .-999
Depth Units.......................
Datum Specification Block sub-type...O
.
TOOL NUMBER
72829
126589
3.750
13488.0
FIo Pro
8.60
45.0
9.0
19000
10.8
.180
.100
.280
.260
66.0
126.0
64.0
64.0
Name Service Order Units Size Nsam Rep Code Offset Channel
DEPT FT 4 1 68 0 1
ROP MWD050 FT/H 4 1 68 4 2
GR MWD050 API 4 1 68 8 3
RPX MWD050 OHMM 4 1 68 12 4
RPS MWD050 OHMM 4 1 68 16 5
RPM MWD050 OHMM 4 1 68 20 6
RPD MWD050 OHMM 4 1 68 24 7
FET MWD050 HOUR 4 1 68 28 8
First Last
Name Service Unit Min Max Mean Nsam Reading Reading
DEPT FT 13651 14431 14041 1561 13651 14431
ROP MWD050 FT/H 0.05 1426.82 78.6313 1473 13695 14431
GR MWD050 API 39.11 81.58 59.3296 1472 13651 14386.5
RPX MWD050 OHMM 8.36 29.27 19.8516 1472 13663.5 14399
RPS MWD050 OHMM 10.48 30.09 22.4494 1472 13663.5 14399
RPM MWD050 OHMM 12.13 29.88 23.5488 1472 13663.5 14399
RPD MWD050 OHMM 14 39.47 24.322 1472 13663.5 14399
FET MWD050 HOUR 0.31 8.93 1. 67258 1472 13663.5 14399
First Reading For Entire Fi1e..........13651
Last Reading For Entire File...........14431
File Trailer
Service name.............STSLIB.006
.
.
Service Sub Level Name...
Version Number...........l.0.0
Date of Generation.......04/02/l0
Maximum Physical Record..65535
File Type............... .LO
Next File Name...........STSLIB.007
Physical EOF
Tape Trailer
Service name.............LISTPE
Date.....................04/02/l0
Origin.................. .STS
Tape Name................UNKNOWN
Continuation Number......Ol
Next Tape Name...........UNKNOWN
Comments.................STS LIS Writing Library. Scientific Technical Services
Reel Trailer
Service name.............LISTPE
Date.....................04/02/l0
Origin...................STS
Reel Name................UNKNOWN
Continuation Number......Ol
Next Reel Name...........UNKNOWN
Comments.................STS LIS Writing Library. Scientific Technical Services
Physical EOF
Physical EOF
End Of LIS File