Department of Commerce, Community, and Economic Development
Alaska Oil and Gas Conservation Commission
Loading...
HomeMy WebLinkAbout204-055New Plugback Esets
7/26/2024
Well Name API Number PTD
Number
ESet
Number
Date
CD2-09 PB1 50-103-20496-70-00 204-129 T39280 2-22-2006
CD2-10 PB1 50-103-20473-70-00 203-195 T39281 2-22-2006
CD2-28 PB1 50-103-20435-70-00 202-217 T39282 2-22-2006
CD2-40 PB1 50-103-20464-70-00 203-126 T39283 2-22-2006
CD2-43 PB1 50-103-20474-70-00 203-197 T39284 10-29-2004
Kasilof South 1 PB1 50-133-20520-70-00 202-256 T39285 5-16-2006
E-20AL1 PB1 50-029-22561-70-00 204-055 T39286 2-22-2006
F-57A PB1 50-029-22747-70-00 203-167 T39287 2-22-2006
G-18 PB1 50-029-23194-70-00 204-020 T39288 2-22-2006
H-16 PB2 50-029-23227-71-00 204-190 T39289 1-27-2005
I-17L1 PB1 50-029-23212-70-00 204-099 T39290 2-22-2006
S-01 PB1 50-029-23141-70-00 203-034 T39291 2-22-2006
S-08 PB1 50-029-23168-70-00 203-123 T39292 8-29-2003
S-18 PB1 50-029-23133-70-00 202-242 T39293 2-22-2006
06-23B PB1 50-029-20808-70-00 204-087 T39294 2-22-2006
07-14B PB1 50-029-20339-70-00 203-142 T39295 2-22-2006
15-38A PB1 50-029-22496-70-00 203-016 T39296 2-22-2006
C-16A PB1 50-029-20438-70-00 203-084 T39297 2-22-2006
D-28B PB1 50-029-21556-70-00 209-089 T39298 8-20-2012
E-01A PB1 50-029-20166-70-00 203-033 T39299 2-22-2006
K-03B PB1 50-029-21011-72-00 204-115 T39300 2-22-2006
NK-62A PB1 50-029-22852-70-00 203-047 T39301 2-22-2006
S-102L1 PB1 50-029-22972-70-00 203-156 T39302 10-26-2005
W-09A PB1 50-029-21947-70-00 204-102 T39303 2-22-2006
E-20AL1 PB1 50-029-22561-70-00 204-055 T39286 2-22-2006
Maunder, Thomas E (DOA)
From: Longden, Kaity [Kaity.Longden@BP.com]
Sent: Friday, March 19, 2010 4:45 PM
To: Maunder, Thomas E (DOA)
Subject: RE: Question on Milne Point Schrader Bluff Injection Orders
Tom-
Page 1 of
•
This well is comingled downhole so we have no true way of monitoring one or the other. We will be taking the
samples at surface. Technically, we will be injecting the tracer into the LS of MPE-13B which is completed in the
OA sand so we expect that the magnesium we see will be coming from the mother bore (MPE-20A) which is the
lateral in the OA sand.
Hope this helps.
Kaity Longden
Pad Engineer
Milne Point Viscous Oil Team
BP Alaska ACT
From: Maunder, Thomas E (DOA) [mailto:tom.maunder@alaska.gov]
Sent: Friday, March 19, 2010 4:28 PM
To: Longden, Kaity
Cc: Roby, David S (DOA)
Subject: RE: Question on Milne Point Schrader Bluff Injection Orders
Thanks Kaity. One question ... will you be monitoring the mother bore (MPE-20A) as well as the lateral MPE-
20AL1)for increased Mg++?
Tom Maunder, PE MQr~-aQ~i,,,~, g~~y-~"s~
AOGCC
From: Longden, Kaity [mailto:Kaity.Longden@BP.com]
Sent: Friday, March 19, 2010 2:53 PM
To: Maunder, Thomas E (DOA)
Cc: Roby, David S (DOA) ~-p~ -Qy~
Subject: RE: Question on Milne Point Schrader Bluff Injection Orders ~ ~ '-I-OS`~
Thanks Tom for the response. We are planning to first try this tracer test on MPE-136LS to MPE-20A late next
week. We will then re-do the test on those wells following an MBE treatment in April. The next set of wells for the
Epsom Salt tracer test will be MPI-10 to MPI-06 sometime early summer this year. I would be happy to send you
updates on our findings as we ge~the informatio\
Kaity Longden ~_ ~®c, `~`~,~ _ `~5
Pad Engineer
Milne Point Viscous Oil Team
BP Alaska ACT
From: Maunder, Thomas E (DOA) [mailto:tom.maunder@alaska.gov]
Sent: Friday, March 19, 2010 9:00 AM
To: Longden, Kaity
Cc: Roby, David S (DOA)
3/22/2010
Page 2 of
•
Subject: RE: Question on Milne Point Schrader Bluff Injection Orders
Kaity,
Dave's interpretation is correct. By adding the Epson salt to the produced water you are creating the tracer fluid.
Tracer fluids are clearly allowed by the injection order.
Good luck with the trial. As the fluid movement information is quantified, we would appreciate a communication
indicating the findings.
Also, can you identify the possible candidate injection wells?
Call or message with any questions. I will place a copy of this message in the Order file.
Tom Maunder, PE
AOGCC
._ _ _
From: Longden, Kaity [mailto:Kaity.Longden@BP.com]
Sent: Wednesday, March 17, 2010 4:31 PM
To: Roby, David S (DOA)
Cc: Maunder, Thomas E (DOA)
Subject: RE: Question on Milne Point Schrader Bluff Injection Orders
Sounds good Dave. Thanks for taking the time to make sure we have our bases covered.
Kaity Longden
Pad Engineer
Milne Point Viscous Oil Team
BP Alaska ACT
564-5554
From: Roby, David S (DOA) [mailto:dave.roby@alaska.gov]
Sent: Wednesday, March 17, 2010 4:22 PM
To: Longden, Kaity
Cc: Maunder, Thomas E (DOA)
Subject: RE: Question on Milne Point Schrader Bluff Injection Orders
I would say your interpretation of the rule is correct but I would like for Tom Maunder, our UIC program manager,
to weigh in on this to make sure I'm not missing something.
Dave Roby
(907)793-1232
From: Longden, Kaity [mailto:Kaity.Longden@BP.com]
Sent: Wednesday, March 17, 2010 3:33 PM
To: Roby, David S (DOA)
Subject: Question on Milne Point Schrader Bluff Injection Orders
Good Afternoon Dave,
I was talking with Mike Bill here at BP yesterday about a tracer study we are looking to do here in the near future.
We are looking to quantify the amount of injection water being cycled between injector and producer pre and post
MBE treatment in order to judge success. In order to do this we will be increasing the Magnesium concentration
in our normal produced water (by adding Epsom Salt) and injecting it in an injector while monitoring the
concentration of Magnesium on the producer side. This will allow us to see what percentage of injected water is
cycling directly through. We expect the tracer to come through in less than 6 hours.
I believe this kind of study is authorized under the Area Injection Order No 10B, Part B: Schrader Bluff Oil Pool
Authorized Fluids, section C) tracer survey fluid to monitor reservoir performance. Mike suggested that I confer
with you prior to the job to make sure we do not need any additional notifications.
Thank you in advance for your help on this. If you need addition information please write back or call my office
3/22/2010
f~J~ Àò(:),
DATA SUBMITTAL COMPLIANCE REPORT
5/25/2006
Permit to Drill 2040550
Well NamelNo. MILNE PT UNIT SB E-20AL 1
Operator BP EXPLORATION (ALASKA) INC
),~ / M, ~O()¥
API No. 50-029-22561-60-00
MD 11078
"....,
TVD 4247 r- Completion Date 5/10/2004 /"
Completion Status 1-01L
Current Status 1-01L
UIC N
REQUIRED INFORMATION
Mud Log No Samples No Directional Survey Yes
DATA INFORMATION
Types Electric or Other Logs Run: MWD, GR, RES, ABI, IFR, CASANDRA, PWD (data taken from Logs Portion of Master Well Data Maint
Well Log Information: .
Log/ Electr
Data Digital Dataset Log Log Run Interval OH/
Type Med/Frmt Number Name Scale Media No Start Stop CH Received Comments
~~
,...5B- D Asc Directional Survey 6/9/2004 MWD Survey
~t Directional Survey 6/9/2004 MWD
~ D Asc Directional Survey 0 0 6/9/2004 IIFR Survey
~ Directional Survey 0 0 6/9/2004 IIFR
~ D Asc Directional Survey 0 0 6/9/2004 MWD Survey PB1
Blat Directional Survey 0 0 6/9/2004 MWD PB 1
---eo- D Asc Directional Survey 0 0 6/9/2004 IIFR Survey PB1
R,:J( Directional Survey 0 0 6/9/2004 IIFR PB1
EO D Lis 12517 Induction/Resistivity 2395 11 025 Open 6/28/2004 MWD EWR4 ABI ROP
PWD
4 LIS Verification 0 0 Open 6/28/2004 Listing for 12517
~ D Lis 12518 I nd uction/Resistivity 2395 6014 Open 6/28/2004 PB1 MWD EWR4 ABI .
ROP PWD
ßPV' LIS Verification 2395 6014 Open 6/28/2004 LISTING FOR 12518
W C Lis 13539 Induction/Resistivity 5274 11078 Open 2/22/2006 ROP DGR EWR plus
Graphics / PB 1 ROP DGR
EWR 5274-6067 plus
Graphics
Well Cores/Samples Information:
Sample
Interval Set
Name Start Stop Sent Received Number Comments
Permit to Drill 2040550
MD 11078
TVD 4247
ADDITIONAL INFORMATION
Well Cored? Y ~
Chips Received? ~
Analysis ~
Received?
Comments:
Compliance Reviewed By:
DATA SUBMITTAL COMPLIANCE REPORT
5/25/2006
Well Name/No. MILNE PT UNIT SB E-20AL 1
Operator BP EXPLORATION (ALASKA) INC
Completion Date 5/10/2004
Completion Status 1-01L
Current Status 1-01L
Daily History Received?
cYN
G/N
Formation Tops
~
Date:
API No. 50-029-22561-60-00
UIC N
8 j u.. CI\~ ~ ð () ~
.
.
.
.
c.
WELL LOG TRANSMITTAL
To: State of Alaska
Alaska Oil and Gas Conservation Comrn.
Attn.: Librarian
333 West ih Ave., Suite 100
Anchorage, Alaska 99501
February 16, 2006
J~i?J1
RE: MWD Formation Evaluation Logs MPE-20A L1 & MPE-20A L1 PB1,
The technical data listed below is being submitted herewith. Please address any problems or
concerns to the attention of:
Rob Kalish, Sperry Drilling Services, 6900 Arctic Blvd., Anchorage, AK 99518 907-273-3500
MPE-20A Ll & MPE-20A Ll PB1:
LAS Data & Digital Log Images:
50-029-22561-60, 70
;)O4~ 055'
1 CD Rom
t~~
0"1 ~J~ l!&?
· STATE OF ALASKA I
ALASKA"('5'IL AND GAS CONSERVATION COMMSION
WELL COMPLETION OR REcOMPLETION REPORT AND LOG
""""
1a. Well Status: !HI Oil 0 Gas 0 Plugged 0 Abandoned 0 Suspended 0 WAG
20AAC 25.105 20AAC 25.110
21. Logs Run:
MWD , GR , RES, ABI, IFR , CASANDRA , PWD
CASING, LINER AND CEMENTING RECORD
$ETTING DEPJ'HMD $ETTINGDÊF'r1-l TV[)
Bort'óM Top BorrollA
112' 32' 112'
2457' 31' 2434'
5274' 33' 4283' 9-7/8" 520 sx Class 'G'
11048' 4282' 4251' 6-1/8" Sand Screens Liner
o GINJ 0 WINJ 0 WDSPL No. of Completions
2. Operator Name:
BP Exploration (Alaska) Inc.
3. Address:
P.O. Box 196612, Anchorage, Alaska 99519-6612
4a. Location of Well (Governmental Section):
Surface:
3637' NSL, 1955' WEL, SEC. 25, T13N, R10E, UM
Top of Productive Horizon:
4624' NSL, 4027' WEL, SEC. 25, T13N, R10E, (NB)
Total Depth:
778' NSL, 4128' WEL, SEC. 23, T13N, R10E, (NB)
4b. Location of Well (State Base Plane Coordinates):
Surface: x- 569191 y- 6016175 Zone- ASP4
TPI: x- 567109 y- 6017142 Zone- ASP4
Total Depth: x- 561715 y- 6018528 Zone- ASP4
18. Directional Survey 0 Yes !HI No
22.
20"
91.1#
54.5#
29.7#
12.6#
H-40
K-55
L-80
L-80
32'
31'
33'
5269'
13-3/8"
7-518"
4-1/2"
23. Perforations op'en to Production (MD + TVD of Top and
Bottom Interval, Size and Number; if none, state "none"):
4", 9.5#, L-80 Sand screens
MD TVD MD TVD
5434' - 11006' 4318' - 4255'
26.
Date First Production:
June 8, 2004
Date of Test Hours Tested
6-29-2004 12
Flow Tubing Casing Pressure
Press.
One Other
5. Date Comp., Susp., or Aband.
5/10/2004
6. Date Spudded
5/1/2004
7. Date T.D. Reached
5/5/2004
8. KB Elevation (ft):
KBE = 58.55'
9. Plug Back Depth (MD+ TVD)
11078' + 4247'
10. Total Depth (MD+TVD)
11078' + 4247'
11. Depth where SSSV set
N/A MD
19. Water depth, if offshore
N/A MSL
24"
16"
SIZE
2-7/8", 12.6#, L-80
25.
Revision: 07/21/04, .Start Produétion ~
1 b. Well Class:
!HI Development 0 Exploratory
o Stratigraphic 0 Service
12. Permit to Drill Number
204-055
13. API Number
50- 029-22561-60-00
14. Well Name and Number:
MPE-20AL 1
15. Field I Pool(s):
Milne Point Unit I Schrader Bluff
Ft
Ft
16. Property Designation:
ADL 047437
17. Land Use Permit:
20. Thickness of Permafrost
1800' (Approx.)
250 sx Arcticset I (Approx.)
784 sx PF 'E', 250 sx 'G', 150 sx PF 'E'
TUBING. RECORD
DEPTH SET (MD)
5106'
PACKER SET (MD)
N/A
DEPTH INTERVAL (MD) AMOUNT & KIND OF MATERIAL USED
Freeze Protected with 80 Bbls Crude and
2 Bbls Diesel
PRODUCTION TEST
Method of Operation (Flowing, Gas Lift, etc.):
Flowing
Oll-BBl GAs-McF WATER-Bsl
1000 212 166
PRODUCTION FOR
TEST PERIOD ...
CALCULATED .....
24-HoUR RATE""'"
Oil -Bsl
2001
GAs-McF
424
WATER-Bsl
332
I GAS-Oil RATIO
212
Oil GRAVITY-API (CORR)
CHOKE SIZE
27. CORE DATA
Brief description of lithology, porosity, fractures, apparent dips and presence of oil, gas or water (attach separate sheet, if necessary).
Submit core chips; if none, state "none".
None
DDnaidlÔ 10«:':1
~1g¡r1L.
Jut.. a 2?OO~
Form 10-407 Revised 12/2003
ORfGrNAL
CONTINUED ON REVERSE SIDE
p
(C)
28. r
e
GEOLOGIC MARKERS
29.
-
FORMATION TESTS
NAME
MD
TVD
Include and briefly summarize test results. List intervals tested,
and attach detailed supporting data as necessary. If no tests
were conducted, state "None".
None
TUZC 4060'
TUMA 4642'
TUMB 4683'
SBF2-NA 5326'
SBF1·NB 5430'
3762'
4050'
4066'
4296'
4317'
30. List of Attachments:
31. I hereby certify that the foregoing is true and correct to the best of my knowledge.
Signed Sondr Title Technical Assistant
Date()'l - 2 1'04
MPE-20AL 1
Well Number
204-055
Permit No. I Approval No.
INSTRUCTIONS
GENERAL: This form is designed for submitting a complete and correct well completion report and log on all types of lands and leases in
Alaska.
Prepared By Name/Number:
Drilling Engineer:
Sandra Stewman, 564-4750
Walter Quay, 564-4178
ITEM 1a: Classification of Service Wells: Gas Injection, Water Injection, Water-Altemating-Gas Injection, Salt Water Disposal, Water
Supply for Injection, Observation, or Other. Multiple completion is defined as a well producing from more than one pool with
production from each pool completely segregated. Each segregated pool is a completion.
ITEM 4b: TPI (Top of Producing Interval).
ITEM 8: The Kelly Bushing elevation in feet above mean low low water. Use same as reference for depth measurements given in other
spaces on this form and in any attachments.
ITEM 13: The API number reported to AOGCC must be 14 digits (ex: 50-029-20123-00-00).
ITEM 20: True vertical thickness.
ITEM 22: Attached supplemental records for this well should show the details of any multiple stage cementing and the location of the
cementing tool.
ITEM 23: If this well is completed for separate production from more than one interval (multiple completion), so state in item 1, and in
item 23 show the producing intervals for only the interval reported in item 26. (Submit a separate form for each additional
interval to be separately produced, showing the data pertinent to such interval).
ITEM 26: Method of Operation: Flowing, Gas Lift, Rod Pump, Hydraulic Pump, Submersible, Water Injection, Gas Injection, Shut-In, or
Other (explain).
ITEM 27: If no cores taken, indicate "None".
ITEM 29: List all test information. If none, state "None".
Form 10-407 Revised 12/2003
Submit Original Only
',1.
. STATE OF ALASKA .
ALASKA~L AND GAS CONSERVATION COM~SION
WELL COMPLETION OR REcOMPLETION REPORT AND LOG
1a. Well Status: a Oil 0 Gas 0 Plugged 0 Abandoned 0 Suspended 0 WAG
20MC 25.105 20MC 25.110
o GINJ 0 WINJ 0 WDSPL No. of Completions
2. Operator Name:
BP Exploration (Alaska) Inc.
3. Address:
P.O. Box 196612, Anchorage, Alaska 99519-6612
4a. Location of Well (Governmental Section):
Surface:
3637' NSL, 1955' WEL, SEC. 25, T13N, R10E, UM
Top of Productive Horizon:
4624' NSL, 4027' WEL, SEC. 25, T13N, R10E, (NB)
Total Depth:
778' NSL, 4128' WEL, SEC. 23, T13N, R10E, (NB)
4b. Location of Well (State Base Plane Coordinates):
Surface: x- 569191 y- 6016175' Zone- ASP4
TPI: x- 567109 y- 6017142 Zone- ASP4
Total Depth: x- 561715 y- 6018528 Zone- ASP4
18. Directional Survey a Yes 0 No
21. Logs Run:
MWD , GR , RES, ABI , IFR , CASANDRA , PWD
CASING, LINER AND CEMENTING RECORD
SETTING DePTH MD SETrIN$DEÞ1'H 1VO Hôl..E.
BOTTOM BOTTOM SIZE
112' 32' 112' 24"
2457' 31' 2434' 16"
5274' 33' 4283' 9-7/8"
11048' 4282' 4251' 6-1/8"
I"
22.
CASING
SIZE
WT. PER
91.1#
54.5#
29.7#
12.6#
32'
31'
33'
5269'
20"
H-40
K-55
L-80
L-80
13-3/8"
7-5/8"
4-1/2"
23. Perforations op'en to Production (MD + TVD of Top and
Bottom Interval, Size and Number; if none, state "none"):
4", 9.5#, L-80 Sand screens
MD TVD MD TVD
5434' - 11006' 4318' - 4255'
26.
Date First Production:
Not on Production
Date of Test Hours Tested PRODUCTION FOR
TEST PERIOD +
Flow Tubing Casing Pressure CALCULATED +
Press. 24-HoUR RATE
One Other
5. Date Comp., Susp., or Aband.
5/1 0/2004 ~
6. Date Spudded
5/1/2004
l
7. Date T.D. Reached
,,l
5/5/2004
8. KB Elevation (ft):
KBE = 58.55'
9. Plug Back Depth (MD+ TVD)
11078' + 4247'
10. Total Depth (MD+TVD)
"' 11078' + 4247"
11. Depth where SSSV set
N/A MD
19. Water depth, if offshore
N/A MSL
24.
SIZE
2-7/8", 12.6#, L-80
25.
1 b. Well Class:
a Development 0 Exploratory
o Stratigraphic 0 Service
12. Permit to Drill Number
204-055
13. API Number
50- 029-22561-60-00
14. Well Name and Number:
MPE-20AL 1
15. Field I Pool(s):
Milne Point Unit I Schrader Bluff
Ft
Ft
16. Property Designation:
ADL 047437
17. Land Use Permit:
20. Thickness of Permafrost
1800' (Approx.)
''7Jif.l~
»
7.'1, ó/
;;; 2.. '?t/ '.dO}/:>
t./z..g 3 ".7'Y,,:;,
CEMENTII'JGRECÒRD
250 sx Arcticset I (Approx.)
784 sx PF 'E', 250 sx 'G', 150 sx PF 'E'
520 sx Class 'G'
Sand Screens Liner
AMOUNT
PUllED
DEPTH SET (MD)
5106'
PACKER SET (MD)
N/A
DEPTH INTERVAL (MD) AMOUNT & KIND OF MATERIAL USED
Freeze Protected with 80 Bbls Crude and
2 Bbls Diesel
PRODUCTION TEST
Method of Operation (Flowing, Gas Lift, etc.):
N/A
Oll-Bsl GAs-McF WATER-Bsl
CORE DATA
Brief description of lithology, porosity, fractures, apparent dips and presence of oil, gas or water (attach separate sheet, if necessary).
Submit core chips; if none, state "none". ".~, .
~ fr()!;c\ >i ~.:
~. f~'-\TE :
; ~.(-:~~:OK ~
! ~ .:~4PU.~.j ~ . ""l\\~-V"\
t......,,,,....,"...."'é.....
Oll-Bsl
27.
GAs-McF
W A TER-BSl
None
\JØ)\IS ÐIFl
H~ 1\. 2, 100'
.~\Jq~. ~ n '.'.
f f !''''c'' r.
t i .
'.
Form 10-407 Revised 12/2003
CONTINUED ON REVERSE SIDE
CHOKE SIZE I GAS-Oil RATIO
Oil GRAVITY-API (CORR)
6Y
; ,
--
GEOLOGIC MARKERS
29.
e
FORMATION TESTS
Include and briefly summarize test results. List intervals tested,
and attach detailed supporting data as necessary. If no tests
were conducted, state "None".
2~.
NAME
MD
TVD
None
TUZC 4060'
TUMA 4642'
TUMB 4683'
SBF2-NA 5326'
SBF1-NB 5430'
3762'
4050'
4066'
4296'
4317'
30. List of Attachments: Summary of Daily Drilling Reports, Well Schematic Diagram, Surveys and a Leak-Off Test Summary.
31. I hereby certify that the foregoing is true and correct to the best of my knowledge.
Signed ..~~
Sond~S~ )' ~ . _ .
MPE-20AL 1 2 - 5
Well Number Permit No.1 Approval No.
INSTRUCTIONS
GENERAL: This form is designed for submitting a complete and correct well completion report and log on all types of lands and leases in
Alaska.
Ti!!e
Technical Assistant
DateCX:o- :lC>--oJ
Prepared By Name/Number:
Drilling Engineer:
Sandra Stewman, 564-4750
Walter Quay, 564-4178
ITEM 1a: Classification of Service Wells: Gas Injection, Water Injection, Water-Alternating-Gas Injection, Salt Water Disposal, Water
Supply for Injection, Observation, or Other. Multiple completion is defined as a well producing from more than one pool with
production from each pool completely segregated. Each segregated pool is a completion.
ITEM 4b: TPI (Top of Producing Interval).
ITEM 8: The Kelly Bushing elevation in feet above mean low low water. Use same as reference for depth measurements given in other
spaces on this form and in any attachments.
ITEM 13: The API number reported to AOGCC must be 14 digits (ex: 50-029-20123-00-00).
ITEM 20: True vertical thickness.
ITEM 22: Attached supplemental records for this well should show the details of any multiple stage cementing and the location of the
cementing tool.
ITEM 23: If this well is completed for separate production from more than one interval (multiple completion), so state in item 1, and in
item 23 show the producing intervals for only the interval reported in item 26. (Submit a separate form for each additional
interval to be separately produced, showing the data pertinent to such interval).
ITEM 26: Method of Operation: Flowing, Gas Lift, Rod Pump, Hydraulic Pump, Submersible, Water Injection, Gas Injection, Shut-In, or
Other (explain).
ITEM 27: If no cores taken, indicate "None".
ITEM 29: List all test information. If none, state "None".
Form 10-407 Revised 12/2003
Submit Original Only
, ,
; ¡
Tree: 29/16" - 5M CIW
Wellhead: FMC 11" x 27/8",a
Hanger, 2 7/8" EU 8rd T & B '.
2.5" CIW - Type H BPV profile
, ,
,
Conductor Casing
D:IÐ
...
Window in 13 3/8" 2457 - 2481 '
13 3/8" EZSV set @ 2489'
133/8" 54.5 ppf K-55 BTRC 12587' I ...
KOP @ 900'
Hole angle passes 50 degrees @ 4100'
Max angle in tubing = 68 0
Angle at lower GLM = 68 0
27/8" 6.5# L-80 EUE 8rd
(Drift D= 2.347" 10, Cap = .0058 bpf)
75/8" 29.7# L-80 IBT-M casing
(drift ID = 6.75", cap = .379 BPF wI tbg)
Window in 75/8" Csg @ 5274' - 5286'
Well Angle @ window = 740
Baker Tie Sack Sleeve 5453'
Saker ZXP Liner Top Packer 5464'
Baker 75/8" x 51/2" HMC Liner Hanger 5470'
75/8" HES Float Collar 5902' (PBTD)
7 5/8" HES Float Shoe Btm. 5989'
MPE-2oA1L· f Orig. KB-GLelev. =
e. RT-GL. elev.=
, L
57.80' (Doyon 14)
33.12' (Doyon 14)
17 5/8" Casing Ian
gency slips w/1
SWS 2 7/8" X 1" KBMM GLM 1118'
~
SWS 2 7/8" X 1" KBMM GLM 14937' 1
HES 2.313 XN Nipple 14994' I
(2.250 No-go 10)
Centrilift Discharge Head
GPDIS
15045'
Centrilift Pump Section 1
GPMTAR 1:1 122 Stage GC2200 5046'
Centrilift Tandem Gas Separator 1
GRSFXTBARH6 5066'
Centrilift Tandem Seal Section I
GSB3 DB UT/LT IL H6 PFS AFLAS/HSN 5071 '
Centrilift Motor 114 HP / KMHG 15085'
2330 Volt / 30 Amps
Pump Mate Sensor
(TVD 4226')
15101'
Baker Hook Wall
Hanger above 7 5/8" Window 5269'
Baker Hook Wall
Hanger outside 7 5/8" Window 5292'
61/8" Hole td @ 11078' (4247' tvd)
II
NB Lateral 149 jts. - 4' Excluder Screened Liner & Blanks 72'
9.5 & 12.6# L-80 IBT (5320'-11006') Rat hole
~
\
DATE REV. BY COMMENTS
9/02195 JBF ESP / Frac Pack Completion - 4ES
3/29/04 MOO Sidetrack Prep - 4ES
5/10/04 Lee Hulme Sidetrack and ESP Completion - Doyon 14
~
I
Easy Well Solutions Swell Pkr 5299 - 5314'
ª
Btm.4 1/2" Guide Shoe 11049'
t
61/8" Hole td @ 9878' (4414' tvd)
.
OA Lateral 89 jts - 4 1/2" Slotted Liner
12.6# L-80 IBT (6149' - 9833')
l'
Rat hole
Blm. Baker 4 1/2" Guide Shoe 9877'
MILNE POINT UNIT
WELL MPE-20A
API NO: 50-029-22561-01
API NO: 50-029-22561-60 L 1
BP EXPLORATION (AK)
Legal Name: MPE-20
Common Name: MPE-20
TesfDate
4/23/2004
4/27/2004
FIT
FIT
2,469.0 (ft)
6,013.0 (ft)
BP EXPLORATION
Leak-Off Test Summary
Test Depth (TVD)
2,445.0 (ft)
4,413.0 (ft)
AMW
9.00 (ppg)
9.10 (ppg)
Surface Pressure
400 (psi)
800 (psi)
Leak Off Pressure (BHP)
1,543 (psi)
2,886 (psi)
~'.. .
Page40f 1
EMW
12.15 (ppg)
12.59 (ppg)
e
e
Printed: 5/17/2004 9:30:35 AM
, ¡
e
e
BP EXPLORATION
Operations Summary Report
Page 1 of 7
Legal Well Name: MPE-20
Common Well Name: MPE-20 Spud Date: 5/21/1995
Event Name: DRILL+COMPLETE Start: 4/10/2004 End:
Contractor Name: DOYON DRILLING INC. Rig Release: 5/10/2004
Rig Name: DOYON 14 Rig Number: 14
Date Code NPT
4/21/2004 00:00 - 03:00 3.00 RIGU P PRE Skid rig floor in - Move rig MPE-25 to MPE-20 - Skid rig floor
out to drilling position - Rig up
03:00 - 05:00 2.00 RIGU P PRE Accept rig 0300 hrs 4/21/04 - Check for pressure, none - Nipple
down CIW 2 9/16 5k tree and FMC 11" x 2 9/16 tubing head
adapter - Remove tubing hanger - Nipple down FMC 11" x 13
5/8 tubing head
05:00 - 09:30 4.50 BOPSUP P PRE Nipple up 135/8 Bop stack
09:30 - 14:30 5.00 BOPSUP P PRE Set lower test plug, Rig up lines, Test Bop: Test all lines valves
and rams to 250 low /3500 psi high, Test hydrill 250/2500
spi, Test Floor valves and Top drive IBop to 250 /3500 psi- ok
14:30 - 15:00 0.50 BOPSUF P PRE Pull test plug, Install wear bushing
15:00 - 15:30 0.50 BOPSUP P PRE Close blind rams, Attempt to test 133/854.5# K-55 casing to
2500 psi, started pumping in at 1800 psi, would not test
15:30 - 16:00 0.50 BOPSUF P PRE RIH to 100' Displace out diesel with seawater
16:00 - 18:30 2.50 BOPSUPP PRE Pick up 5" Hwt drill pipe and 4· HT-38 drill pipe and stand back
in derrick while waiting on 13 3/8 RTTS tool
18:30 - 20:00 1.50 BOPSUF N HMAN PRE Pick up 6 - 61/4 drill collar and one stand of 5" Hwt drill pipe,
Make up Halliburton 13 3/8 RTTS and by pass - 30,000 pounds
below RTTS
20:00 - 23:00 3.00 BOPSUF N HMAN PRE RIH with Rtts test casing on way down, Test casing on back
side of Rtts to 1000 psi at 195, 962, 1922' & 2169' all good,
Test below Rtts at 2169' pressure up to 1800 psi, will not hold
pressure, bled off to zreo with in two minutes - Pooh
23:00 - 00:00 1.00 BOPSUF N HMAN PRE Make up 13 3/8 RTTS and By-Pass with drill collars on top of
tool, RIH
4/22/2004 00:00 - 01 :30 1.50 BOPSUPN HMAN PRE RIH with Rtts, Tag EZSV at 2507' dpm, Pick up and set Rtts at
2,495' - Test back side 2,495' to surface to 1500 psi, good -
attempt to test below Rtts by pumping down drill string,
pressure up to 1200 psi, will not hold pressure, bled to zero in
one minute.
01 :30 - 03:30 2.00 BOPSUF N HMAN PRE Pooh, stand back drill collars- Lay down 13 3/8 Rtts and
by-pass
03:30 - 05:30 2.00 BOPSUF N HMAN PRE Make dummy run through well head with running tool - Make
up Halliburton 133/8 Fast drill (composite) bridge plug - TIH
slowly
05:30 - 06:00 0.50 BOPSUP N HMAN PRE Set Halliburton 133/8 fast drill bridge plug at 2,490' dpm, shear
off with 50k up
06:00 - 07:00 1.00 BOPSUPN HMAN PRE Test casing to 1500 psi for 30 minutes on chart - ok
07:00 - 08:00 1.00 BOPSUF N HMAN PRE Pooh. Lay down running tool
08:00 - 12:00 4.00 STWHIP P INT1 Make up Baker 13 3/8 Window master whipstock and milling
assembly with 12 1/4" od upper mill, Pick up Sperry 6 3/4"
MWD/GRlRes - Orient and program MWD
12:00 - 14:00 2.00 STWHIP P INT1 TIH with whipstock assembly slowly to 2,463'
14:00 - 15:00 1.00 STWHIP P INT1 Displace to 9.0 ppg LSND milling fluid, Orient whipstock with
MWD to 76 deg left of high side, tag Bridge plug at 2,488' dpm
- Set anchor with 20k, verify with 10k pick up, shear off
whipstock with 45K down wt.
15:00 - 00:00 9.00 STWHIP P INT1 Mill window in 13 3/8 54.5# K-55 casing, top of window 2,457' -
Pumping 600 gpm at 1050 psi, rotating at 95 rpm's with 4 -
9,000 ftlb torque - Maintain mud wt. 9.0 ppg with 50+ yield
point for hole cleaning - good metal recovery over shakers -
starter mill at 2,491' at 2400 hrs
4/23/2004 00:00 - 02:00 2.00 STWHIP P INT1 Finish milling 24' window in 13 3/8 casing - window 2,457 to
Printed: 5/1712004 9:30:47 AM
, .
, ,
'.
e
e
BP EXPLORATION
Operations Summary Report
Page 2 of 7
Legal Well Name: MPE-20
Common Well Name: MPE-20 Spud Date: 5/21/1995
Event Name: DRILL+COMPLETE Start: 4/10/2004 End:
Contractor Name: DOYON DRILLING INC. Rig Release: 5/10/2004
Rig Name: DOYON 14 Rig Number: 14
Date From - To Code NPT Phase
4/23/2004 00:00 - 02:00 2.00 STWHIP P INT1 2,481' - Starter mill ended at 2,506'
02:00 - 03:00 1.00 STWHIP P INT1 Pump high vis sweep and circulate hole clean pumping 600
gpm, 1020 psi
03:00 - 03:30 0.50 STWHIP P INT1 FIT: Test Formation to 400 psi at 2,445'TVD with 9,0 ppg mud
in hole, 12.1 ppg EMW. -ok - Middle of window 2,469' md,
2,445 TVD
03:30 - 08:00 4.50 STWHIP P INT1 Pooh, Lay down 6 1/4" steel drill collar and Milling assembly-
upper mill 12 1/4" od, Clear rig floor
08:00 - 08:30 0.50 STWHIP P INT1 Flush bop stack with Wash tool, Function rams, flush stack
08:30 - 10:30 2.00 STWHIP P INT1 Pick up Drilling BHA with Re-Run 9 7/8" Smith S73 PDC bit,
Sperry 7" motor set at 1.22 deg, MWD/GRlRES - Orient and
program MWD
10:30 - 11 :30 1.00 STWHIP P INT1 TIH to 2,400' - window at 2,457'
11:30 -12:00 0.50 STWHIP P INT1 Orient to 75 deg left, slide through window with no problem,
Tag bottom at 2,506'
12:00 - 00:00 12.00 DRILL P INT1 Directional drill as per directional plan 2,506 to 3,880' - Art 3.06
hrs, Ast 4.29 hrs, Average Rop 187 Whr - Pumping 500 to 550
gpm, Rotating at 120 rpm's with 5 - 8,000 Wlb torque - Back
ream each stand slowly
4/24/2004 00:00 - 08:30 8.50 DRILL P INT1 Continue Directional drill 3,880 to 4,649' - Building angle and
turn well bore to right - pumping 550 gpm at 2200 psi, rotating
at 120 rpm's with 4 -6,000 ftIIb torque - Maintain mud wt. 9.0 to
9.1 ppg - finish building angle to 66 deg at 4490' - Art 1.28 hrs,
Ast 3.55 hrs, Average Rop 159 Whr
08:30 - 10:00 1.50 DRILL P INT1 Circulate two bottom up pumping 588 gpm at 2350 psi, rotating
120 rpm's
10:00 - 11 :30 1.50 DRILL P INT1 Pump out of hole at 500 gpm to window at 2,457'
11 :30 - 12:30 1.00 DRILL P INT1 Service rig and top drive
12:30 - 13:30 1.00 DRILL P INT1 TIH to 4,555' no problem, Precautionary wash 4,555 to bottom
at 4,649'
13:30 - 15:00 1.50 DRILL P INT1 Drill 4,649 to 4,679' - Gumbo plugging flow line and shaker,
circulate and clean out gumbo
15:00 - 00:00 9.00 DRILL P INT1 Directional drill 4,679 to 5,495 - Art 3.34, Ast 2.62, Average rop
142 ftlhr - Build angle to 76 deg, add 2% Lubricant to aid
sliding - Maintain mud wt. at 9.3 ppg - Pumping 544 gpm at
2500 psi, rotating at 120 rpm's 5 -8,000 Wlbs torque
4/25/2004 00:00 - 12:00 12.00 DRILL P INT1 Continue directional drilling 5,495 to 7 5/8 casing point at 5,993'
- start building angle for landing in 'OA' sand at 5,700' - Art 4,58
hrs, Ast 2,56 hrs, Average Rop 69 ftlhr - while drilling below
5800', BHA building angle as rotating ahead at 3 deg /100'
12:00 - 15:00 3.00 CASE P INT1 Circulate and condition mud, Consult with Geologist about
possible sidetrack, Circulate three bottoms up pumping 560
gpm at 2600 psi, Rotate at 120 rpm's
15:00 - 16:30 1.50 CASE P INT1 Pump out of hole 5,993 to 4,555' for wiper trip
16:30 - 17:00 0,50 CASE P INT1 TIH - No problem - precautionary wash 5,899 to 5,993'
17:00 - 19:00 2.00 CASE P INT1 Pump high vis sweep, circulate three bottoms up at 600 gpm
2900 psi, rotate at 120 rpm's
19:00 - 22:00 3.00 CASE P INT1 Pump out of hole 5,993 to 2,541' - Pull into casing - Monitor
well - ok
22:00 - 23:00 1,00 CASE P INT1 Circulate casing clean pumping 600 gpm 1950 psi
23:00 - 00:00 1.00 CASE P INT1 Pump slug, Pooh, Lay down BHA
4/26/2004 00:00 - 01 :30 1,50 DRILL P INT1 Finish laying down Bha, Bit in bad shape, Nose worn down to
8", Most of gauge down to 8" - 2" of upper gauge 9.5" od
Printed: 5/17/2004 9:30:47 AM
, '
, ,
,
"
e
e
BPEXPLORA TION
0perations··SummaryReport
Page 3 of 7
Legal Well Name:
Common Well Name:
Event Name:
Contractor Name:
Rig Name:
MPE-20
MPE-20
DRILL+COMPLETE
DOYON DRILLING INC.
DOYON 14
Start: 4/10/2004
Rig Release: 5/10/2004
Rig Number: 14
Spud Date: 5/21/1995
End:
Date From -To Hours Code NPT Phase Description of Ope rations
4/26/2004 01 :30 - 03:00 1,50 CASE P INT1 Pull wear bushing, set test plug, change top rams to 7 5/8 - test
door to 1500 psi
03:00 - 04:00 1.00 CASE P INT1 Rig up 350 ton casing tools, & Franks fill tool
04:00 - 04:30 0.50 CASE P INT1 Safety meeting with Doyon casing operator and drill crew
04:30 - 09:30 5.00 CASE P INT1 Run 145 jts 7 5/8 29,7# L-80 Btc-mod 5996,85' Intermediate
casing set at 5988.72' - Make up Torque 9,000 ftIlbs - Circulate
bottoms up at window before going into open hole, 6 bpm 300
psi - No problem in open hole
09:30 - 10:00 0.50 CASE P INT1 Rig down franks fill up tool, Blow down top drive, Make up
Dowell cement head.
10:00 - 12:30 2.50 CEMT P INT1 Circulate and condition hole for cement, stage up 2 bpm to 6
bpm at 360 psi - Reciprocate casing 20' stroke - p/u 190k, s/o
135k - Circulate two casing volume
12:30 - 14:30 2,00 CEMT P INT1 Cement with Dowell as follows: pump 5 bbls of CW100, Test
lines 3500 psi, Pump 20 bbls CW100 + 40 bbls of Mud push II
mixed at 10,1 ppg, Drop bottom plug, Cement with 520 sx
Class 'G' w/.3% D-65 + .35% D167 + ,05% B155 - Yield 1.16
cf/sx 106 bbls of slurry down hole mixed at 15.8 ppg on fly-
Drop top plug and displace with 9.1 ppg oil base mud with
dowell unit at 6 bpm at 300 to 700 psi - Bump plug to 1500 psi-
check floats -ok- CIP at 1420 hrs 4/26/04
14:30 - 15:30 1.00 CEMT P INT1 Flush wellhead with water thru lower annulus valve, Rig down
Cement head
15:30 - 16:30 1.00 CEMT P INT1 Break wellhead between casing head and drillling spool - Pick
up Bop stack
16:30 - 17:30 1,00 CEMT P INT1 Set 12 x 75/8 slip with 175k net on slips
17:30 - 19:00 1.50 CEMT P INT1 Make up casing blow down tool, void 60' of oil base mud from 7
5/8 casing - Rig up Cameron cold cut casing cutter, cut & bevel
7 5/8 casing at 9" above slips
19:00 - 20:30 1.50 WHSUR P INT1 Remove 30.82' cut off jt - Remove drilling spool and set back
bop stack - Install 12 x 7 5/8 pack -off
20:30 - 22:30 2.00 WHSUR P INT1 Nipple up FMC 13 5/8 x 11" Gen 4 tubing head - Test pack-off
to 3350 psi, 70% of collapse of 7 5/8-
22:30 - 00:00 1.50 BOPSUP P INT1 Nipple up 11 x 135/8 adapter spool, Nipple up Bop stack,
Change out choke line spool
4/27/2004 00:00 - 01 :30 1.50 BOPSUF P INT1 Finish nipple up Bop - Clean mud pits
01 :30 - 02:30 1.00 BOPSUFP INT1 Change top rams to 3 1/2 x 6" variable bore rams
02:30 - 03:00 0.50 BOPSUF P INT1 set upper test plug, Rig up lines
03:00 - 07:30 4.50 BOPSUF P INT1 Test Bop: Test all rams, lines and valve to 250 low/ 3500 high-
Test hydrill250 /2500 psi - Test Top drive IBOP and floor
valves to 250 / 3500 psi 5min. per test, the right to witness test
was wavier by John Crisp
07:30 - 08:00 0.50 BOPSUF P INT1 Install wear ring
08:00 - 10:00 2.00 CASE P INT1 Picking up BHA 3 #, Bit PDC FM2643 with 3 X 12 jets, 4 3/4
Sperry drill 1.5 bend, Stab,float sub,4 3/4 Slimphase 4 with
DGR & EWR,DM sub,PWD,Pulser,3 flex DC,Jars
10:00 - 10:30 0.50 CASE P INT1 Flush pumps with oil base mud, test MWD
10:30 - 16:30 6.00 CASE P INT1 Picking up 4 Drill pipe from shed
16:30 - 18:00 1.50 CASE P INT1 Slip and cut drill line, service top drive
18:00 - 19:00 1.00 CASE P INT1 Circ bottoms up with 246 gpm 2420 psi
19:00 - 20:00 1.00 CASE P INT1 Pressure test Csg to 3500 psi for 30 min., good test
20:00 - 21 :30 1.50 DRILL P INT1 Drill float, and shoe track and 20 ft of new hole to 6013', tag
float @ 5906 Shoe 5991.
Printed: 5/1712004 9:30:47 AM
,
e
e
BPEXPLORATION
Operations Summary Report
Legal Well Name:
Common Well Name:
Event Name:
Contractor Name:
Rig Name:
Date
MPE-20
MPE-20
DRILL+COMPLETE
DOYON DRILLING INC.
DOYON 14
Start: 4/10/2004
Rig Release: 5/10/2004
Rig Number: 14
Pha.se
4/27/2004
From - To Hours Task Code NPT
21 :30 - 22:00 0.50 CASE P
22:00 - 23:00 1.00 DRILL P
23:00 - 00:00 1.00 DRILL P
00:00 - 21 :30 21.50 DRILL P
PROD1
INT1
PROD1
PROD1
4/28/2004
21 :30 - 23:00 1.50 DRILL N SFAL PROD1
23:00 - 00:00 1.00 DRILL P PROD1
4/29/2004 00:00 - 00:00 24.00 DRILL P PROD1
4/30/2004 00:00 - 01 :00 1.00 DRILL P PROD1
01 :00 - 03:00 2.00 CASE P PROD1
03:00 - 04:30 1.50 CASE P PROD1
04:30 - 05:00 0.50 CASE P PROD1
05:00 - 06:30 1.50 CASE P PROD1
06:30 - 10:30 4.00 CASE P PROD1
10:30 - 12:00 1.50 CASE P PROD1
12:00 - 14:30 2.50 CASE P PROD1
14:30 - 16:00 1.50 CASE P PROD1
16:00 - 17:00 1.00 CASE P PROD1
17:00 - 21 :00 4.00 CASE P PROD1
21 :00 - 00:00 3.00 CASE P PROD1
5/1/2004 00:00 - 00:30 0.50 CASE P PROD1
00:30 - 01 :00 0.50 CASE P PROD1
01 :00 - 01 :30 0.50 CASE P PROD1
01 :30 - 02:00 0.50 CASE P PROD1
02:00 - 04:30 2.50 CASE P PROD1
04:30 - 09:30 5.00 STWHIP P PROD2
09:30 - 12:00 2.50 STWHIP P PROD2
12:00 - 13:00 1.00 STWHIP P ewI-Vd PROD2
E£.. W'\LI
13:00 - 18:30 5.50 STWHIP P rnf> ,'- . PBQD2
18:30 - 19:30
19:30 - 21:00
21 :00 - 22:30
1.00 STWHIP P
1.50 STWHIP P
1.50 STWHIP P
PROD2
PROD2
PROD2
Spud Date: 5/21/1995
End:
Circ bottoms up
FIT test with 9.1 mud wt. 800 psi, 4413 TVD= 12.5 EMW,
Establish base line ECD of 9.8
Directional Drill 6013' to 6066' with 80 rpms, 256 gals per min,
2870 psi, Torque 4,000, ECD 10.0, ART .12, AST .34
Directional Drill 6066' to 7666' with 80 rpms, 270 gals per min,
3060 psi, Torque 4,000, ECD 10.2
Top of OA sand 6155 MD TVD 4433
Circ, stand back one stand, repair Hydraulic line on top drive
Directional Drill 7666' to 7700' with 80 rpms, 270 gals per min,
3120 psi, Torque 4,000, ECD 10.2, AST 6.04 ART 5.34, ECD
10.3
Directional Drill 7700' to 9764' with 100 rpms, 270 gals per min,
3350 psi, Torque 8,000, ECD 10.7, AST 4.98, ART 7.55
Directional Drill 9764' to 9878' TD with 100 rpms, 270 gals per
min, 3350 psi, Torque 8,000, ECD 10.7, build from 88 degree
to 98 degrees in last 500 ft.
Circ, three bottoms up with 280 gals min., 3500 psi, 100 rpms,
pump sweep, ECD 10.8 dropped to 10.7
Pumping out with full drilling rate to 8600 ft.
Tripping back to bottom 9878'
Circ, two bottoms up, with 280 gals min. 3500 psi, 100 rpms
Pump out to window @ 5993 with full drill rate
Circ 2.5 bottoms up from 5993
Trip out to BHA, pull string wet
Stand back BHA, lay down MWD and motor
Clean floor of oil base mud, rig up to run 4.5 liner,PJSM
Pick up total 106 jts 4.512.6# L-80 liner, 89 slotted, 17 solid, 7
5/8 Baker liner hanger, 7 5/8 ZXP liner top packer, setting tools
Tripping in with liner
Tripping in with liner, pickup wt 140K, slack off wt. 85K, tag
bottom pickup 1 ft. shoe @ 9877, liner hanger 5470, packer
5463, top of tie back 5452', liner lap 525'
Circ, drill pipe volume
Circ, Drop ball, Set hanger w/2500 psi, set packer w/3200 psi,
shear ball with 4500 psi,
Test back side with 1,000 psi to test liner top packer, release
from liner, flow check
Tripping out w/ running tools, Lay down running tools, clean
floor of oil base mud
Picking up whipstock BHA #4, test MWD
Tripping in with whipstock
Orient whipstock to 23 degrees to left of high side, set anchor
with 20 K,shear off whipstock
Mill window with 50-90 roms. 2-5K bit wt.. 270 gals min., 1960
psi
top of window 5274', bottom window 5286', drill new hole to
5296'
work window
Circ and reciprocate pipe above window for bottoms up
Tripping out with Mills to BHA
Standing back HWP and 4 3/4 DC, lay down mills and Bumper
jars
Printed: 5/1712004 9:30:47 AM
, I
e
,
e
Page 5 of 7
BP EXPLORATION
Operations Summary Report
Legal Well Name:
Common Well Name:
Event Name:
Contractor Name:
Rig Name:
MPE-20
MPE-20
DRILL+COMPLETE
DOYON DRILLING INC.
DOYON 14
Hours Task
5/1/2004
0.50 STWHIP P
1.00 STWHIP P
2.00 DRILL P
PROD2
PROD2
PROD2
22:30 - 23:00
23:00 - 00:00
00:00 - 02:00
5/2/2004
02:00 - 03:30 1.50 DRILL P PROD2
03:30 - 05:00 1.50 DRILL N RREP PROD2
05:00 - 07:00 2.00 DRILL N HMAN PROD2
07:00 - 08:00 1.00 DRILL N HMAN PROD2
08:00 - 08:30 0.50 DRILL P PROD2
08:30 - 09:00 0.50 DRILL P PROD2
09:00 - 19:00 10.00 DRILL P PROD2
19:00 - 19:30 0.50 DRILL N DPRB PROD2
19:30 - 21 :00 1.50 DRILL N DPRB PROD2
21 :00 - 00:00 3.00 DRILL N DPRB PROD2
5/3/2004 00:00 - 00:00 24.00 DRILL P PROD2
5/4/2004 00:00 - 00:00 24.00 DRILL P PROD2
5/5/2004 00:00 - 01 :00 1.00 DRILL P PROD2
01 :00 - 23:00 22.00 DRILL P PROD2
23:00 - 00:00 1.00 DRILL P PROD2
5/6/2004 00:00 - 02:30 2.50 CASE P COMP
02:30 - 06:30 4.00 CASE P COMP
06:30 - 09:00 2.50 CASE P COMP
09:00 - 10:30 1.50 CASE P COMP
10:30 - 11 :00 0.50 CASE P COMP
11 :00 - 12:30 1.50 CASE P COMP
12:30 - 15:30 3.00 CASE P COMP
15:30 - 18:00 2.50 CASE P COMP
18:00 - 00:00 6.00 CASE P COMP
5/7/2004
3.00 CASE P
COMP
00:00 - 03:00
Start: 4/10/2004
Rig Release: 5/10/2004
Rig Number: 14
Spud Date: 5/21/1995
End:
Description of Operations
Clean floor of oil base mud
pick up Johnny Wacker and flush BOP stack
Picking up BHA #5, 6 3/4 PDC Fm3643 with 3 x 12 jets,5"
Sperry drill 1.5 bend,6 1/16 stab, float sub,4 3/4 Slimphase 4
w/DGRlEWR, 43/4 DM,4 3/4 PWD,4 3/4 pulser,3 Flex dc,jars,
Surface test MWD
Tripping in to 3950'
Repair chain in Draw works
Tripping back out to BHA, to pickup jars that were left out of
BHA
Tripping in to 3950
Trip in from 3950 to 5200' o'flI1IIVI
Orient and slide thru window @ 5274 to 5286 ¡.s;;: '_1
Directional Drill from 5288' to 6067' TVD 4297' with 250 gpm '1tr~
2500 psi, 100 rpms 1'r2 Â c: f_^ ~
Circ. bottoms up for side track \~.~ -=> ~~ S- - ~~
Pump out to 5680, working trough 5680- 5695, side track well
5695, Tvd 4320
Directional Drill from 5695' to 5875' with 250 gpm 2500 psi, 100
rpms
AST 4.66, ART 2.46, Tq 3K, ECD 10.1
Directional Drill from 5875' to 7900' with 250 gpm 2800 psi, 100
rpms
ECD 10.3, AST 7.81, ART 5.02 TQ 6K,
Directional Drill from 7900' to 9714' with 250 gpm 2800 psi, 100
rpms
ECD 10.8, AST 7.32, ART 6.04, Tq 6K
Circ bottoms up 1.5 times to clean up hole with 256 gals min.
2750 psi, 100 rpms, ECD dropped from 10.8 to 10.4
Directional Drill from 9714' to 11078' with 250 gpm 3200 psi, ......
100 rpms
ECD 11.6
Circ. one bottoms up with 254 gals min. 3200 psi,1oo rpm ECD
start 11 .6 dropped to 11.3
Circ. 2.5 bottoms up with 275 gals min. 3500 psi, 100 rpm ECD
start 11.6 dropped to 11.2, total bottoms up 3.5 times
Pumping out to 7410 with full drilling rate, packed off
Reaming from 7410 to 6790 254 gals min 100 rpms
Pumping out 6790 to 5334, pulled out with out pump to 5238
slight packing off 6360 to 6100
Circ to clear csg of cuttings
Slip and cut drilling line, service top drive
Trip to bottom with no problems, washed 90 ft to bottom
Circ two bottoms up with 280 gals min. 3580 psi, 100 rpms
ECD 11.4 dropped to 11.0
Circ at slower rate with 230 mesh screens on shakers to clean
up oil mud for screen liner run, starting rate 131 gpm, 1500 psi,
final rate 260 gals min,3,000 psi, (Mud still will not pass screen
test)
Circ with 230 mesh screens on shakers to clean up oil mud for
screen liner run, 260 gals min, 3,000 psi, Mud pass screen test
@ 0100 behind shakers, circ one more round to get clean mud
thru pits and coming up hole. ECD 10.9, P/U wt 135K,S/0 wt
Printed: 5/17/2004 9:30:47 AM
e
e
BPEXPLORA TION
Operations Summary Report
Page 6 of7
Legal Well Name: MPE-20
Common Well Name: MPE-20 Spud Date: 5/21/1995
Event Name: DRILL+COMPLETE Start: 4/10/2004 End:
Contractor Name: DOYON DRILLING INC. Rig Release: 5/10/2004
Rig Name: DOYON 14 Rig Number: 14
Hou rs Task Code NPT Phase Description of Operations
517/2004 00:00 - 03:00 3.00 CASE P COMP 75K
03:00 - 09:00 6.00 CASE P COMP Pumping out with full drilling rate to window, pull thru window
with out pumping
09:00 - 10:00 1.00 CASE P COMP Circ bottoms up, 267 gals min. 2300 psi
10:00 - 12:00 2.00 CASE P COMP POH to BHA.
12:00 - 14:00 2.00 CASE P COMP Lay down BHA # 5
14:00 - 15:00 1.00 CASE P COMP Pickup BHA #6 whipstock ret. tool and MWD, shallow test
MWD
15:00 - 16:30 1.50 CASE P COMP Trip in with whipstock pull tools to 5,265'
16:30 - 17:30 1.00 CASE P COMP Orient and circ, hooking whipstock, pulled free with 170K
17:30 - 18:30 1.00 CASE P COMP Circ bottoms up
18:30 - 20:30 2.00 CASE P COMP Trip out with whipstock
20:30 - 22:00 1.50 CASE P COMP Lay down whipstock, and space out jts
22:00 - 22:30 0.50 CASE P COMP Service rig, clear floor
22:30 - 23:00 0.50 CASE P COMP Rig up to run liner,PJSM
23:00 - 00:00 1.00 CASE P COMP Picking up 4 ' C-27 Med. Excluder IBT Screen liner
5/8/2004 00:00 - 05:00 5.00 CASE P COMP Picking up 4 ' C-27 Med. Excluder IBT Screen liner
05:00 - 07:00 2.00 CASE P COMP Cross over to drill pipe, Orient string and working thru window
@ 5274' to 5286' went thru window on 4th try
07:00 - 10:00 3.00 CASE P COMP Picking up liner and swell packer and hook hanger, total One
bend jt 4.5,64 jts 4" screens, 62 jts 4' blanks, 23 jts 4.5 blanks
10:00 - 17:00 7.00 CASE P COMP Tripping in with liner on drill pipe, having lots of hang ups with
centerilizers on bottom of window, got in to the first hole and
went to 6079', pull out 4 sds. and turn liner 180 degrees and
went in to the right hole, pick up wt 160K Slo 65K
17:00 - 18:00 1.00 CASE P COMP Hooked window with hanger, drop ball and release from liner
with 3000psi, shear ball with 4500 psi P/U wt 115K, S/o 100k,
Top of liner 5269', swell packer 5299, shoe 11,048
18:00 - 20:00 2.00 CASE P COMP Tripping out with running tools, lay down same
20:00 - 21 :30 1.50 CASE P COMP Tripping in with Johnny Wacker to 5240' to displace hole
21 :30 - 23:00 1.50 CASE P COMP Displace well with 40 bbls LVT, 25 bbls Hi Vis spacer, 40 bbls,
safe surf, 25 bbls Hi Vis spacer, 288 bbls 9.1 Brine treat with
corxit, 125 rpms 12 bbls min.
23:00 - 00:00 1.00 CASE P COMP Clean up Shakers/ Ditch take on brine returns
5/9/2004 00:30 - 08:30 8.00 CASE P COMP Laying down drill pipe and BHA from hole, lay down drill pipe
in derrick in the mouse hole. (hole taking app. two bbls hr. of
9.1 brine)
08:30 - 09:30 1.00 CASE P COMP Pulled wear ring, clear floor of oil base mud
09:30 - 10:00 0.50 CASE P COMP Service rig.
10:00 - 12:00 2.00 CASE P COMP Rig up to run tubing
12:00 - 12:30 0.50 RUNCOrvP COMP Pjsm on picking up tubing
12:30 - 15:30 3.00 RUNCOrvP COMP Picking up 152 hp 2325 volts motor and test same
15:30 - 17:00 1.50 RUNCOMN SFAL COMP Change out tubing tongs, to stack tubing tongs
17:00 - 23:00 6.00 RUNCOrvP COMP Picking up 2 7/8 6.5# L-80 EUE 8 rd tubing, total Jts 157 jts,
motor @ 5105, XN nipple, 4994, GLM 4937, GLM 118', P/U wt
80K S/O 75K, blocks 50K, run with 88 clamps
23:00 - 00:00 1.00 RUNCOrvP COMP Making up hanger, circ 10 bbls of brine thru motor with 800 psi,
1 bbls min., install two way check
5/10/2004 00:00 - 02:30 2.50 RUNCOrvP COMP Rig up ESP cable to penetrator, and test same, install blass
cap on penetrator, land Tubing with TWC in place.
02:30 - 03:00 0.50 RUNCOrvP COMP Test TWC to 1000 psi
03:00 - 04:30 1.50 RUNCOrvP COMP Nipple down BOP stack
04:30 - 06:00 1.50 RUNCOrvP COMP Nipple up Fmc adapter 11' X 2 9/16 ESP, CIW 2 9/16 5,000#
Printed: 5/17/2004 9:30:47 AM
, !
.;
Legal Well Name:
Common Well Name:
Event Name:
Contractor Name:
Rig Name:
Date
e
e
BP EXPLORATION
Operations·Summary Report
MPE-20
MPE-20
DRILL+COMPLETE
DOYON DRILLING INC.
DOYON 14
Start: 4/10/2004
Rig Release: 5/10/2004
Rig Number: 14
From -To Hol.Jrs Task Code NPT Phase
5/10/2004
04:30 - 06:00
06:00 - 07:30
1.50 RUNCOM"
1.50 RUNCOM"
Page 7 of 7
Spud Date: 5/21/1995
End:
Description of Operations
COMP Tree, test adapter and tree to 5,000 psi
COMP Pull TWC and install BPV, secure well.( rig release @07:30
5/1 0/2004)
Printed: 5/1712004 9:30:47 AM
.
.
24-May-04
AOGCC
Howard Okland
333 W. 7th Ave. Suite 100
Anchorage, AK 99501
DEFINITIVE
Re: Distribution of Survey Data for Well MPE-20A L 1
Dear Dear Sir/Madam:
Enclosed are two survey hard copies and one disk with the *.PTT and *.PDF
files.
Tie-on Survey:
Window / Kickoff Survey:
Projected Survey:
5,257.76' MD
5,274.00' MD
11,078.00' MD
(if applicable)
PLEASE ACKNOWLEDGE RECEIPT BY SENDING AN EMAIL TO
CARL.ULRICH@HALLlBURTON.COM OR SIGNING AND
RETURNING A COPY OF THE TRANSMITTAL LETTER TO THE
ATTENTION OF:
Sperry-Sun Drilling Services
Attn: Carl Ulrich
6900 Arctic Blvd.
Anchorage, AK 99518
Date Cf J ~ .t.ð-ð"t.
Signed
1W- ~1LI
Please call me at 273-3545 if you have any questions or concerns.
Regards,
William T. Allen
Survey Manager
). ~ vi - ()S->"
Attachment(s)
Halliburton Sperry-Sun
Milne Point Unit
BPXA
Milne Point MPE
MPE-20AL 1
Job No. AKZZ3034600, Surveyed: 5 May, 2004
Survey Report
20 May, 2004
Your Ref: API 500292256160
Surface Coordinates: 6016175.23 N, 569190.80 E (70· 27'16.3793- N, 149· 26' 07.3457" W)
Grid Coordinate System: NAD27 Alaska State Planes, Zone 4
Surface Coordinates relative to Project H Reference: 1016175.23 N, 69190.80 E (Grid)
Surface Coordinates relative to Structure Reference: 2378.77 N, 227.84 W (True)
Kelly Bushing Elevation: 58. 55ft above Mean Sea Level
Kelly Bushing Elevation: 58. 55ft above Project V Reference
Kelly Bushing Elevation: 58. 55ft above Structure Reference
SpE!r"'r"')I-SUI!
CAlL. L. liNG seA VI c: e s
A Halliburton Company
DEFINITIVE
e
e
Survey Ref: svy1398
Halliburton Sperry-Sun
Survey Report for Milne Point MPE - MPE-20AL 1
Your Ref: AP/500292256160
Job No. AKZZ3034600, Surveyed: 5 May, 2004
BPXA
Milne Point Unit
Measured True Sub-Sea Vertical Local Coordinates Global Coordinates Dogleg Vertical
Depth Incl. Azim. Depth Depth Northings Eastings Northings Eastings Rate Section Comment
(ft) (ft) (ft) (ft) (ft) (ft) (ft) (o/100ft)
5257.76 73.730 303.120 4220.11 4278.66 898.98 N 1930.55 W 6017056.24 N 567251.99 E 2116.98 Tie On Point
--" 5274.00 74.610 303.120 4224.54 4283.09" 907.51 N 1943.63 W 6017064.66 N 567238.82 E 5.419 2132.11 Window Point
5324.87 77.370 302.080 4236.86 4295.41 934.10 N 1985.21 W 6017090.86 N 567197.00 E 5.777 2180.03
5361.24 76.930 301.330 4244.94 4303.49 952.74 N 2015.38 W 6017109.21 N 567166.66 E 2.346 2214.58
5390.35 77.880 300.730 4251.29 4309.84 967.38 N 2039.72 W 6017123.63 N 567142.18 E 3.834 2242.34 e
5421.09 80.210 300.100 4257.13 4315.68 982.66 N 2065.75 W 6017138.66 N 567116.02 E 7.842 2271.89
5453.98 82.820 299.430 4261.99 4320.54 998.81 N 2093.98 W 6017154.55 N 567087.63 E 8.187 2303.82
5487.77 85.430 298.740 4265.44 4323.99 1015.14 N 2123.35 W 6017170.61 N 567058.11 E 7.987 2336.88
5517.79 88.830 298.120 4266.95 4325.50 1029.41 N 2149.72 W 6017184.64 N 567031.62 E 11.512 2366.43
5551.49 91.480 297.430 4266.86 4325.41 1045.12N 2179.53 W 6017200.06 N 567001.66 E 8.126 2399.71
5584.06 91.480 296.760 4266.02 4324.57 1059.95 N 2208.52 W 6017214.62 N 566972.53 E 2.056 2431.92
5614.57 91.670 296.140 4265.18 4323.73 1073.53 N 2235.82 W 6017227.95 N 566945.10 E 2.125 2462.14
5645.78 91.730 295.500 4264.25 4322.80 1087.12 N 2263.90 W 6017241.28 N 566916.90 E 2.059 2493.10
5679.78 91.910 294.800 4263.17 4321.72 1101.56 N 2294.67 W 6017255.43 N 566886.00 E 2.125 2526.87
5710.85 89.940 291.570 4262.67 4321.22 1113.79 N 2323.22 W 6017267.40 N 566857.34 E 12.175 2557.83
5762.13 89.570 293.110 4262.89 4321.44 1133.28 N 2370.65 W 6017286.45 N 566809.73 E 3.089 2609.01
5806.92 89.810 295.520 4263.13 4321.68 1151.72 N 2411.46W 6017304.51 N 566768.75 E 5.407 2653.58
5857.31 91.170 295.560 4262.70 4321.25 1173.44 N 2456.92 W 6017325.81 N 566723.08 E 2.700 2703.61
5901.66 91.980 295.150 4261.48 4320.03 1192.43 N 2496.99 W 6017344.42 N 566682.85 E 2.047 2747.65
5952.28 90.930 293.560 4260.20 4318.75 1213.30 N 2543.08 W 6017364.86 N 566636.56 E 3.763 2798.01
5997.79 89.380 291.010 4260.07 4318.62 1230.55 N 2585.19 W 6017381.72 N 566594.29 E 6.557 2843.43 e
6049.44 88.150 284.800 4261.19 4319.74 1246.42 N 2634.30 W 6017397.13 N 566545.04 E 12.254 2895.03
6093.69 86.600 279.580 4263.21 4321.76 1255.75 N 2677.49 W 6017406.06 N 566501.76 E 12.293 2938.93
6134.96 86.730 277.600 4265.62 4324.17 1261.91 N 2718.23 W 6017411.84 N 566460.97 E 4.800 2979.49
6187.56 88.030 274.090 4268.02 4326.57 1267.25 N 2770.49 W 6017416.70 N 566408.66 E 7.109 3030.70
6239.39 90.990 272.570 4268.46 4327.01 1270.26 N 2822.22 W 6017419.23 N 566356.90 E 6.420 3080.66
6284.41 94.700 271.920 4266.23 4324.78 1272.03 N 2867.15 W 6017420.57 N 566311.96 E 8.366 3123.77
6333.31 94.940 272.380 4262.12 4320.67 1273.85 N 2915.84 W 6017421.95 N 566263.26 E 1.058 3170.47
6379.80 93.890 272.11 0 4258.54 4317.09 1275.67 N 2962.15 W 6017423.34 N 566216.93 E 2.332 3214.91
6428.54 92.590 271.460 4255.79 4314.34 1277.18 N 3010.79 W 6017424.40 N 566168.28 E 2.981 3261 .46
6475.46 92.900 268.360 4253.54 4312.09 1277.11 N 3057.65 W 6017423.89 N 566121.42 E 6.632 3305.82
6524.81 92.900 268.180 4251.04 4309.59 1275.62 N 3106.92 W 6017421.95 N 566072.17 E 0.364 3352.00
6571.92 91.730 266.350 4249.14 4307.69 1273.38 N 3153.93 W 6017419.26 N 566025.18 E 4.608 3395.80
6618.69 91.670 266.080 4247.75 4306.30 1270.29 N 3200.58 W 6017415.74 N 565978.56 E 0.591 3438.99
6667.14 90.740 266.340 4246.73 4305.28 1267.09 N 3248.91 W 6017412.09 N 565930.26 E 1.993 3483.73
20 May, 2004·15:51 Page 20f6 Dri/lQuest 3.03.06.002
'. "
Halliburton Sperry-Sun
Survey Report for Milne Point MPE - MPE-20AL 1
Your Ref: AP/500292256160
Job No. AKZZ3034600, Surveyed: 5 May, 2004
BPXA
Milne Point Unit
Measured True Sub-Sea Vertical Local Coordinates Global Coordinates Dogleg Vertical
Depth Incl. Azim. Depth Depth Northings Eastings Northings Eastin9s Rate Section Comment
(ft) (ft) (ft) (ft) (ft) (ft) (ft) (0/100ft)
6718.71 89.200 267.110 4246.76 4305.31 1264.14N 3300.40 W 6017408.67 N 565878.81 E 3.339 3531.54
6765.87 87.590 267.420 4248.08 4306.63 1261.89 N 3347.48 W 6017405.98 N 565831.74 E 3.477 3575.41
6815.24 87.840 268.500 4250.05 4308.60 1260.14N 3396.78 W 6017403.77 N 565782.46 E 2.244 3621.54
6861.16 90.860 268.880 4250.57 4309.12 1259.09 N 3442.68 W 6017402.29 N 565736.58 E 6.628 3664.67
6914.09 93.650 271.490 4248.49 4307.04 1259.26 N 3495.56 W 6017401.97 N 565683.70 E 7.215 3714.80 e
6958.96 93.640 272.000 4245.64 4304.19 1260.62 N 3540.32 W 6017402.92 N 565638.93 E 1.135 3757.63
7009.72 94.950 272.910 4241.83 4300.38 1262.79 N 3590.89 W 6017404.62 N 565588.34 E 3.139 3806.21
7055.27 94.010 272.000 4238.28 4296.83 1264.73 N 3636.25 W 6017406.14 N 565542.96 E 2.868 3849.80
7105.60 92.720 273.620 4235.32 4293.87 1267.20 N 3686.43 W 6017408.14 N 565492.76 E 4.110 3898.12
7151.17 91 .420 273.920 4233.68 4292.23 1270.19N 3731.88 W 6017410.71 N 565447.29 E 2.928 3942.11
7201.44 89.200 274.210 4233.40 4291.95 1273.76 N 3782.02 W 6017413.81 N 565397.12 E 4.454 3990.74
7247.03 86.540 273.610 4235.10 4293.65 1276.86 N 3827.46 W 6017416.49 N 565351.64 E 5.981 4034.78
7297.32 86.050 273.530 4238.35 4296.90 1279.99 N 3877.55 W 6017419.15 N 565301.53 E 0.987 4083.22
7343.84 86.170 273.900 4241.50 4300.05 1282.99 N 3923.87 W 6017421.73 N 565255.19 E 0.834 4128.05
7395.05 86.540 274.300 4244.76 4303.31 1286.65 N 3974.84 W 6017424.91 N 565204.18 E 1.063 4177.50
7438.46 86.170 276.280 4247.52 4306.07 1290.64 N 4017.98 W 6017428.50 N 565161.01 E 4.631 4219.63
7488.11 88.080 276.190 4250.01 4308.56 1296.03 N 4067.27 W 6017433.43 N 565111.67 E 3.851 4268.04
7533.99 89.570 277.020 4250.95 4309.50 1301.30 N 4112.83W 6017438.28 N 565066.06 E 3.717 4312.89
7585.05 92.470 278.540 4250.04 4308.59 1308.21 N 4163.41 W 6017444.72 N 565015.42 E 6.412 4363.00
7630.00 91.790 278.580 4248.37 4306.92 1314.90N 4207.83 W 6017451.00 N 564970.94 E 1.515 4407.21
7681.10 90.800 278.250 4247.22 4305.77 1322.37 N 4258.36 W 6017458.00 N 564920.34 E 2.042 4457.48 e
7726.63 91.300 280.680 4246.38 4304.93 1329.86 N 4303.26 W 6017465.07 N 564875.37 E 5.448 4502.40
7774.58 90.190 280.690 4245.76 4304.31 1338.75 N 4350.38 W 6017473.52 N 564828.18 E 2.315 4549.87
7823.00 91.910 280.840 4244.87 4303.42 1347.79 N 4397.93 W 6017482.12 N 564780.54 E 3.566 4597.82
7870.50 91.300 281.110 4243.54 4302.09 1356.83 N 4444.55 W 6017490.73 N 564733.85 E 1.404 4644.86
7917.43 90.930 281.030 4242.63 4301.18 1365.84 N 4490.59 W 6017499.31 N 564687.72 E 0.807 4691.37
7968.57 88.890 282.310 4242.71 4301.26 1376.18 N 4540.67 W 6017509.19 N 564637.54 E 4.709 4742.11
8012.33 91.790 284.680 4242.45 4301.00 1386.39 N 4583.22 W 6017519.00 N 564594.91 E 8.558 4785.68
8061.18 88.460 283.600 4242.34 4300.89 1398.33 N 4630.58 W 6017530.49 N 564547.43 E 7.166 4834.37
8109.65 88.390 281.890 4243.67 4302,22 1409.01 N 4677.84 W 6017540.74 N 564500.08 E 3.530 4882.55
8156.02 88.890 283.340 4244.77 4303.32 1419.14 N 4723.07 W 6017550.45 N 564454.75 E 3.307 4928.65
8204.69 90.370 285.470 4245.09 4303,64 1431.24 N 4770.21 W 6017562.11 N 564407.51 E 5.329 4977.17
8253.54 88.150 289.200 4245.72 4304.27 1445.79 N 4816.82 W 6017576.23 N 564360.76 E 8.885 5025.99
8301.30 85.430 290.850 4248.39 4306.94 1462.12 N 4861.62 W 6017592.14 N 564315.81 E 6.658 5073.66
8351.92 85.180 289.300 4252.54 4311.09 1479.44 N 4909.00 W 6017609.02 N 564268.27 E 3.091 5124.09
20 May, 2004 - 15:51 Page 3 of6 DrillQuest 3.03.06.002
.'1
." ~ -'~
Halliburton Sperry-Sun
Survey Report for Milne Point MPE - MPE-20AL 1
Your Ref: AP/500292256160
Job No. AKZZ3034600, Surveyed: 5 May, 2004
BPXA
Milne Point Unit
Measured True Sub-Sea Vertical Local Coordinates Global Coordinates Dogleg Vertical
Depth Inel. Azim. Depth Depth Northings Eastings Northings Eastings Rate Section Comment
(ft) (ft) (ft) (ft) (ft) (ft) (ft) (0/100ft)
8394.92 87.280 287.580 4255.37 4313.92 1493.01 N 4949.70 W 6017622.21 N 564227.44 E 6.307 5167.00
8428.68 88.020 288.510 4256.75 4315.30 1503.46 N 4981.78 W 6017632.36 N 564195.28 E 3.519 5200.73
8463.25 87.960 286.320 4257.96 4316.51 1513.80 N 5014.74 W 6017642.39 N 564162.22 E 6.333 5235.26
8488.65 88.830 284.290 4258.67 4317.22 1520.50 N 5039.23 W 6017648.86 N 564137.67 E 8.692 5260.61
8523.30 90.860 283.410 4258.77 4317.32 1528.79 N 5072.87 W 6017656.85 N 564103.95 E 6.385 5295.13 e
8588.78 92.100 280.320 4257.08 4315.63 1542.25 N 5136.92 W 6017669.71 N 564039.78 E 5.083 5360.11
8629.92 92.720 279.980 4255.35 4313.90 1549.49 N 5177.38 W 6017676.57 N 563999.26 E 1.718 5400.75
8681.16 90.000 279.370 4254.13 4312.68 1558.10 N 5227.87 W 6017684.71 N 563948.69 E 5.440 5451.33
8733.17 91.300 281.290 4253.54 4312.09 1567.42 N 5279.03 W 6017693.56 N 563897.44 E 4.458 5502.78
8773.35 88.950 282.280 4253.45 4312.00 1575.63 N 5318.36 W 6017701.40 N 563858.04 E 6.346 5542.66
8831.57 91.420 283.230 4253.26 4311.81 1588.48 N 5375.14 W 6017713.73 N 563801.14 E 4.545 5600.56
8873.83 88.830 285.260 4253.17 4311.72 1598.88 N 5416.09 W 6017723.74 N 563760.09 E 7.787 5642.68
8926.95 87.590 286.610 4254.83 4313.38 1613.46 N 5467.14 W 6017737.85 N 563708.91 E 3.450 5695.71
8973.97 87.530 288.550 4256.83 4315.38 1627.64 N 5511.93 W 6017751.62 N 563664.00 E 4.124 5742.68
9024.42 86.850 289.300 4259.31 4317.86 1643.99 N 5559.59 W 6017767.52 N 563616.18 E 2.005 5793.07
9069.30 87.840 289.450 4261.39 4319.94 1658.86 N 5601.88 W 6017782.00 N 563573.75 E 2.231 5837.89
9118.34 90.990 289.630 4261.89 4320.44 1675.26 N 5648.09 W 6017797.96 N 563527.40 E 6.434 5886.92
9164.70 91.110 289.520 4261.04 4319.59 1690.79 N 5691.76 W 6017813.09 N 563483.58 E 0.351 5933.27
9213.46 91.540 290.110 4259.91 4318.46 1707.31 N 5737.62 W 6017829.19 N 563437.57 E 1.497 5982.01
9260.82 90.800 292.860 4258.94 4317.49 1724.65 N 5781.68 W 6017846.12 N 563393.35 E 6.012 6029.30
9311.67 91.610 293.310 4257.87 4316.42 1744.59 N 5828.45 W 6017865.62 N 563346.40 E 1.822 6079.99
9357.18 90.930 296.030 4256.86 4315.41 1763.58 N 5869.79 W 6017884.22 N 563304.89 E 6.159 6125.24 e
9406.25 90.000 296.390 4256.47 4315.02 1785.25 N 5913.81 W 6017905.48 N 563260.67 E 2.032 6173.89
9454.13 90.060 298.150 4256.44 4314.99 1807.18 N 5956.37 W 6017927.02 N 563217.91 E 3.678 6221 .23
9504.32 88.700 298.560 4256.98 4315.53 1831.02 N 6000.53 W 6017950.45 N 563173.52 E 2.830 6270.71
9548.83 89.260 297.030 4257.78 4316.33 1851.77 N 6039.90 W 6017970.83 N 563133.96 E 3.660 6314.66
9585.39 91.600 298.110 4257.50 4316.05 1868.69 N 6072.30 W 6017987.45 N 563101.40 E 7.049 6350.78
9642.35 92.280 298.120 4255.57 4314.12 1895.52 N 6122.51 W 6018013.81 N 563050.95 E 1.194 6406.95
9694.20 92.470 295.470 4253.42 4311.97 1918.87 N 6168.75 W 6018036.73 N 563004.49 E 5.120 6458.24
9739.99 93.330 294.340 4251 .11 4309.66 1938.13 N 6210.23 W 6018055.60 N 562962.84 E 3.099 6503.70
9777.22 94.380 290.760 4248.60 4307.15 1952.37 N 6244.53 W 6018069.52 N 562928.41 E 10.000 6540.76
9838.46 95.630 289.940 4243.26 4301.81 1973.58 N 6301.73 W 6018090.21 N 562871.02 E 2.438 6601.74
9886.08 92.960 289.740 4239.69 4298.24 1989.70 N 6346.39 W 6018105.91 N 562826.21 E 5.623 6649.21
9935.05 89.380 289.380 4238.69 4297.24 2006.09 N 6392.52 W 6018121.87 N 562779.93 E 7.347 6698.16
9984.19 89.260 289.170 4239.28 4297.83 2022.31 N 6438.90 W 6018137.66 N 562733.40 E 0.492 6747.29
20 May, 2004 - 15:51 Page 4 of6 Dril/Quest 3.03.06.002
Halliburton Sperry-Sun
Survey Report for Milne Point MPE - MPE-20AL 1
Your Ref: AP/500292256160
Job No. AKZZ3034600, Surveyed: 5 May, 2004
BPXA
Milne Point Unit
Measured True Sub-Sea Vertical Local Coordinates Global Coordinates Dogleg Vertical
Depth Incl. Azim. Depth Depth Northings Eastings Northings Eastings Rate Section Comment
(ft) (ft) (ft) (ft) (ft) (ft) (ft) (0/100ft)
10027.20 90.620 291.820 4239.32 4297.87 2037.37 N 6479.18 W 6018152.34 N 562692.98 E 6.925 6790.28
10079.79 90.120 292.730 4238.98 4297.53 2057.30 N 6527.85 W 6018171.82 N 562644.13 E 1.974 6842.76
10126.64 91.360 293.280 4238.38 4296.93 2075.61 N 6570.97 W 6018189.72 N 562600.84 E 2.895 6889.48
10175.83 91.300 294.120 4237.24 4295.79 2095.37 N 6615.99 W 6018209.07 N 562555.63 E 1.712 6938.4 7
10220.75 92.280 293.130 4235.83 4294.38 2113.37 N 6657.13 W 6018226.68 N 562514.33 E 3.100 6983.20 e
10269.38 93.890 290.830 4233.22 4291.77 2131.54 N 6702.15 W 6018244.44 N 562469.14 E 5.767 7031.68
10316.01 93.830 290.880 4230.08 4288.63 2148.10N 6745.63 W 6018260.60 N 562425.51 E 0.167 7078.17
10368.79 92.220 290.100 4227.29 4285.84 2166.55 N 6795.00 W 6018278.58 N 562375.97 E 3.389 7130.85
10413.04 93.950 291.360 4224.91 4283.46 2182.19N 6836.32 W 6018293.84 N 562334.51 E 4.834 7175.01
10457.42 91.360 291.520 4222.85 4281.40 2198.39 N 6877.58 W 6018309.66 N 562293.10 E 5.847 7219.29
10507.37 93.950 293.890 4220.54 4279.09 2217.65 N 6923.61 W 6018328.49 N 562246.90 E 7.025 7269.05
10559.60 91.540 296.580 4218.04 4276.59 2239.89 N 6970.79 W 6018350.29 N 562199.51 E 6.910 7320.88
10604.46 89.810 297.180 4217.51 4276.06 2260.17 N 7010.80 W 6018370.19 N 562159.31 E 4.082 7365.28
10655.02 90.310 295.500 4217.46 4276.01 2282.60 N 7056.11 W 6018392.20 N 562113.80 E 3.467 7415.39
10701.63 91.360 292.330 4216.78 4275.33 2301.49 N 7098.70 W 6018410.70 N 562071.03 E 7.164 7461.80
10751.54 91.480 290.750 4215.54 4274.09 2319.81 N 7145.11 W 6018428.58 N 562024.45 E 3.174 7511.64
10792.66 92.470 289.950 4214.12 4272.67 2334.10 N 7183.64 W 6018442.52 N 561985.79 E 3.095 7552.71
1 0845.11 93.640 287.860 4211.33 4269.88 2351.07 N 7233.19 W 6018459.02 N 561936.09 E 4.562 7605.09
10885.87 94.510 287.300 4208.43 4266.98 2363.35 N 7271.95 W 6018470.94 N 561897.22 E 2.537 7645.73
10943.50 96.440 287.750 4202.93 4261.48 2380.62 N 7326.65 W 6018487.71 N 561842.36 E 3.438 7703.09
10980.77 96.060 287.430 4198.88 4257.43 2391.82 N 7361.97 W 6018498.58 N 561806.94 E 1.330 7740.13 e
11008.45 95.870 288.340 4196.00 4254.55 2400.27 N 7388.16 W 6018506.79 N 561780.66 E 3.341 7767.65
11078.00 95.870 288.340 4188.89 4247.44 2422.04 N 7453.84 W 6018527.95 N 561714.79 E 0.000 7836.84 Projected Survey
All data is in Feet (US Survey) unless otherwise stated. Directions and coordinates are relative to True North.
Vertical depths are relative to Well Reference. Northings and Eastings are relative to Well Reference.
Global Northings and Eastings are relative to NAD27 Alaska State Planes, Zone 4.
The Dogleg Severity is in Degrees per 100 feet (US Survey).
Vertical Section is from Well Reference and calculated along an Azimuth of 288.730° (True).
Based upon Minimum Curvature type calculations, at a Measured Depth of 11 078.00ft.,
The Bottom Hole Displacement is 7837.47ft., in the Direction of 288.001 ° (True).
20 May, 2004 - 15:51
Page 50f6
DrillQuest 3.03.06.002
Halliburton Sperry-Sun
Survey Report for Milne Point MPE - MPE-20AL 1
Your Ref: AP/500292256160
Job No. AKZZ3034600, Surveyed: 5 May, 2004
BPXA
Milne Point Unit
Comments
Measured
Depth
(ft)
Station Coordinates
TVD Northin9s Eastings
(ft) (ft) (ft)
Comment
5257.76
5274.00
11078.00
4278.66
4283.09
4247.44
898.98 N
907.51 N
2422.04 N
1930.55 W
1943.63 W
7453.84 W
Tie On Point
Window Point
Projected Survey
e
Survey tool program for MPE-20AL 1
From
Measured Vertical
Depth Depth
(ft) (ft)
To
Measured Vertical
Depth Depth Survey Tool Description
(ft) (ft)
0.00
2416.98
0.00 2416.98
2394.70 11078.00
2394.70 MWD Magnetic (MPE-20)
4247.44 AK-6 BP JFR-AK - MWD+IIFR+MS (MPE-20A)
e
20 May, 2004 - 15:51
Page 60f6
DrillQuest 3.03.06.002
.
.
24-May-04
AOGCC
Howard Okland
333 W. 7th Ave. Suite 100
Anchorage, AK 99501
Re: Distribution of Survey Data for Well MPE-20A L 1 MWD
Dear Dear Sir/Madam:
Enclosed are two survey hard copies and one disk with the *.PTT and *.PDF
files.
Tie-on Survey:
Window / Kickoff Survey:
Projected Survey:
5,257.76' MD
5,274.00' MD
11,078.00' MD
(if applicable)
PLEASE ACKNOWLEDGE RECEIPT BY SENDING AN EMAIL TO
CARL.ULRICH@HALLlBURTON.COM OR SIGNING AND
RETURNING A COPY OF THE TRANSMITTAL LETTER TO THE
ATTENTION OF:
Sperry-Sun Drilling Services
Attn: Carl Ulrich
6900 Arctic Blvd.
Anchorage, AI< 99518 .1 J I. II II I
Date q J"" ~\{ Signed ~ U~
Please call me at 273-3545 if you have any questions or concerns.
Regards,
William T. Allen
Survey Manager
). ~ "... Ø--}-
Attachment(s)
Halliburton Sperry-Sun
Milne Point Unit
BPXA
Milne Point MPE
MPE-20AL 1 MWD
e
Job No. AKMW3034600, Surveyed: 5 May, 2004
Survey Report
20 May, 2004
Your Ref: API 500292256160
Surface Coordinates: 6016175.23 N, 569190.80 E (700 27'16.3793w N, 149026' 07.3457w W)
Grid Coordinate System: NAD27 Alaska State Planes, Zone 4
e
Surface Coordinates relative to Project H Reference: 1016175.23 N, 69190.80 E (Grid)
Surface Coordinates relative to Structure Reference: 2378.77 N, 227.84 W (True)
Kelly Bushing Elevation: 58. 55ft above Mean Sea Level
Kelly Bushing Elevation: 58. 55ft above Project V Reference
Kelly Bushing Elevation: 58. 55ft above Structure Reference
SP'E!F""F""Y-SUf1
ORf......fNG· Se~\f.ees
A Halliburton Company
Survey Ref: svy1399
, .
Halliburton Sperry-Sun
Survey Report for Milne Point MPE - MPE-20AL 1 MWD
Your Ref: API 500292256160
Job No. AKMW3034600, Surveyed: 5 May, 2004
BPXA
Milne Point Unit
Measured True Sub-Sea Vertical Local Coordinates Global Coordinates Dogleg Vertical
Depth Incl. Azim. Depth Depth Northings Eastings Northings Eastings Rate Section Comment
(ft) (ft) (ft) (ft) (ft) (ft) (ft) (O/100ft)
5257.76 73.730 307.410 4220.19 4278.74 920.47 N 1917.85 W 6017077.85 N 567264.48 E 2111.86 Tie On Point
5274.00 74.610 303.120 4224.62 4283.17 929.49 N 1930.60 W 6017086.75 N 567251.65 E 25.985 2126.83 Window Point
5324.87 77.370 302.080 4236.93 4295.48 956.07 N 1972.18 W 6017112.95 N 567209.82 E 5.777 2174.74
5361.24 76.930 301.330 4245.02 4303.57 974.71 N 2002.35 W 6017131.30 N 567179.49 E 2.346 2209.30
5390.35 77.880 300.730 4251.37 4309.92 989.35 N 2026.69 W 6017145.72 N 567155.01 E 3.834 2237.05 e
5421.09 80.210 300.100 4257.21 4315.76 1004.63 N 2052.72 W 6017160.75 N 567128.84 E 7.842 2266.61
5453.98 82.820 299.430 4262.06 4320.61 1020.78 N 2080.95 W 6017176.64 N 567100.46 E 8.187 2298.53
5487.77 85.430 298.740 4265.52 4324.07 1037.12 N 2110.33 W 6017192.70 N 567070.93 E 7.987 2331.59
5517.79 88.830 298.120 4267.02 4325.57 1051.39N 2136.69 W 6017206.73 N 567044.44 E 11.512 2361.14
5551.49 91.480 297.430 4266.93 4325.48 1067.09 N 2166.50 W 6017222.15 N 567014.48 E 8.126 2394.42
5584.06 91.480 300.500 4266.09 4324.64 1082.86 N 2194.98 W 6017237.66 N 566985.85 E 9.423 2426.46
5614.57 91.670 296.420 4265.25 4323.80 1097.39 N 2221.79 W 6017251.94 N 566958.91 E 13.382 2456.51
5645.78 91.730 293.090 4264.33 4322.88 1110.45 N 2250.12 W 6017264.73 N 566930.47 E 10.667 2487.53
5679.78 91.910 287.810 4263.25 4321.80 1122.32 N 2281.95 W 6017276.31 N 566898.53 E 15.531 2521.49
5710.85 89.940 291.980 4262.74 4321.29 1132.89 N 2311.15 W 6017286.60 N 566869.23 E 14.841 2552.54
5762.13 89.570 293.490 4262.96 4321.51 1152.70 N 2358.45 W 6017305.98 N 566821.75 E 3.032 2603.69
5806.92 89.810 296.240 4263.21 4321.76 1171.53 N 2399.08 W 6017324.43 N 566780.95 E 6.163 2648.22
5857.31 91.170 296.260 4262.77 4321.32 1193.82 N 2444.27 W 6017346.30 N 566735.55 E 2.699 2698.17
5901.66 91.980 296.260 4261.56 4320.11 1213.44 N 2484.03 W 6017365.54 N 566695.61 E 1.826 2742.12
5952.28 90.930 294.350 4260.27 4318.82 1235.06 N 2529.77 W 6017386.75 N 566649.67 E 4.305 2792.39
5997.79 89.380 291.500 4260.15 4318.70 1252.79 N 2571.68 W 6017404.08 N 566607.59 E 7.128 2837.77
6049.44 88.150 287.750 4261.26 4319.81 1270.13 N 2620.31 W 6017420.97 N 566558.81 E 7.639 2889.39 e
6093.69 86.600 282.820 4263.29 4321.84 1281.78 N 2662.94 W 6017432.22 N 566516.08 E 11.667 2933.50
6134.96 86.730 280.110 4265.69 4324.24 1289.97 N 2703.31 W 6017440.04 N 566475.63 E 6.563 2974.37
6187.56 88.030 276.100 4268.09 4326.64 1297.37 N 2755.32 W 6017446.96 N 566423.55 E 8.006 3026.00
6239.39 90.990 274.580 4268.54 4327.09 1302.20 N 2806.91 W 6017451.30 N 566371.91 E 6.420 3076.41
6284.41 94.700 274.260 4266.30 4324.85 1305.66 N 2851.74 W 6017454.35 N 566327.06 E 8.271 3119.97
6333.31 94.940 274.610 4262.19 4320.74 1309.43 N 2900.32 W 6017457.67 N 566278.45 E 0.866 3167.19
6379.80 93.890 274.070 4258.62 4317.17 1312.94 N 2946.54 W 6017460.75 N 566232.20 E 2.538 3212.09
6428.54 92.590 273.520 4255.86 4314.41 1316.16 N 2995.09 W 6017463.52 N 566183.62 E 2.895 3259.11
6475.46 92.900 270.440 4253.61 4312.16 1317.78 N 3041.92 W 6017464.70 N 566136.77 E 6.590 3303.98
6524.81 92.900 270.320 4251.12 4309.67 1318.10 N 3091.21 W 6017464.57 N 566087.48 E 0.243 3350.76
6571.92 91.730 268.180 4249.21 4307.76 1317.49N 3138.27 W 6017463.52 N 566040.43 E 5.174 3395.13
6618.69 91.670 267.790 4247.83 4306.38 1315.84 N 3184.99 W 6017461.44 N 565993.72 E 0.843 3438.85
6667.14 90.740 268.450 4246.81 4305.36 1314.25 N 3233.41 W 6017459.40 N 565945.33 E 2.354 3484.19
20 May, 2004 - 15:54 Page 20f6 Dril/Quest 3.03.06.002
, .
Halliburton Sperry-Sun
Survey Report for Milne Point MPE - MPE-20AL 1 MWD
Your Ref: API 500292256160
Job No. AKMW3034600, Surveyed: 5 May, 2004
BPXA
Milne Point Unit
Measured True Sub-Sea Vertical Local Coordinates Global Coordinates Dogleg Vertical
Depth Incl. Azim. Depth Depth Northings Eastings Northings Eastings Rate Section Comment
(ft) (ft) (ft) (ft) (ft) (ft) (ft) (0/100ft)
6718.71 89.200 269.270 4246.83 4305.38 1313.23N 3284.96 W 6017457.89 N 565893.78 E 3.383 3532.69
6765.87 87.590 269.790 4248.16 4306.71 1312.84 N 3332.10 W 6017457.07 N 565846.65 E 3.587 3577.21
6815.24 87.840 270.960 4250.12 4308.67 1313.16 N 3381.43 W 6017456.93 N 565797.32 E 2.422 3624.03
6861.16 90.860 271.630 4250.64 4309.19 1314.20 N 3427.33 W 6017457.55 N 565751.41 E 6.737 3667.83
6914.09 93.650 274.230 4248.56 4307.11 1316.90N 3480.14 W 6017459.76 N 565698.58 E 7.202 3718.71 e
6958.96 93.640 275.030 4245.71 4304.26 1320.52 N 3524.77 W 6017462.96 N 565653.92 E 1.779 3762.14
7009.72 94.950 275.680 4241.91 4300.46 1325.24 N 3575.17 W 6017467.21 N 565603.48 E 2.879 3811.38
7055.27 94.010 274.620 4238.35 4296.90 1329.32 N 3620.39 W 6017470.87 N 565558.22 E 3.105 3855.52
7105.60 92.720 276.350 4235.40 4293.95 1334.12N 3670.40 W 6017475.21 N 565508.16 E 4.283 3904.43
7151.17 91.420 276.720 4233.75 4292.30 1339.30 N 3715.65 W 6017479.97 N 565462.87 E 2.966 3948.94
7201.44 89.200 277.400 4233.48 4292.03 1345.48 N 3765.53 W 6017485.68 N 565412.93 E 4.619 3998.16
7247.03 86.540 276.500 4235.17 4293.72 1350.99 N 3810.75 W 6017490.78 N 565367.67 E 6.159 4042.76
7297.32 86.050 276.480 4238.42 4296.97 1356.67 N 3860.62 W 6017495.98 N 565317.75 E 0.975 4091.80
7343.84 86.170 276.740 4241.58 4300.13 1362.01 N 3906.72 W 6017500.90 N 565271.60 E 0.614 4137.18
7395.05 86.540 277.220 4244.83 4303.38 1368.22 N 3957.45 W 6017506.64 N 565220.82 E 1.182 4187.22
-
7438.46 86.170 279.050 4247.59 4306.14 1374.35 N 4000.33 W 6017512.37 N 565177.88 E 4.293 4229.80
7488.11 88.080 279.040 4250.08 4308.63 1382.14 N 4049.30 W 6017519.71 N 565128.84 E 3.847 4278.68
7533.99 89.570 279.740 4251.02 4309.57 1389.63 N 4094.55 W 6017526.77 N 565083.52 E 3.588 4323.94
7585.05 92.470 281.540 4250.12 4308.67 1399.05 N 4144.72 W 6017535.73 N 565033.27 E 6.684 4374.47
7630.00 91.790 281.430 4248.44 4306.99 1408.00 N 4188.74 W 6017544.27 N 564989.17 E 1.532 4419.03
7681.10 90.800 281.390 4247.29 4305.84 1418.10 N 4238.82 W 6017553.91 N 564939.00 E 1.939 4469.70
7726.63 91.300 284.070 4246.46 4305.01 1428.13 N 4283.22 W 6017563.52 N 564894.51 E 5.987 4514.97 e
7774.58 90.190 285.090 4245.83 4304.38 1440.20 N 4329.62 W 6017575.16 N 564848.00 E 3.144 4562.79
7823.00 91.910 284.480 4244.94 4303.49 1452.56 N 4376.42 W 6017587.08 N 564801.08 E 3.769 4611.09
7870.50 91.300 284.410 4243.61 4302.16 1464.40 N 4422.40 W 6017598.50 N 564754.99 E 1.293 4658.43
7917.43 90.930 284.280 4242.70 4301.25 1476.02 N 4467.86 W 6017609.70 N 564709.42 E 0.836 4705.22
7968.57 88.890 285.420 4242.78 4301.33 1489.13 N 4517.29 W 6017622.35 N 564659.88 E 4.570 4756.24
8012.33 91.790 287.820 4242.52 4301.07 1501.64 N 4559.21 W 6017634.47 N 564617.84 E 8.602 4799.96
8061.18 88.460 286.830 4242.42 4300.97 1516.19 N 4605.84 W 6017648.58 N 564571.08 E 7.112 4848.79
8109.65 88.390 284.680 4243.75 4302.30 1529.34 N 4652.47 W 6017661.30 N 564524.33 E 4.436 4897.17
8156.02 88.890 286.350 4244.85 4303.40 1541.74 N 4697.13 W 6017673.29 N 564479.55 E 3.758 4943.45
8204.69 90.370 288.200 4245.16 4303.71 1556.20 N 4743.60 W 6017687.31 N 564432.95 E 4.868 4992.10
8253.54 88.150 292.000 4245.79 4304.34 1572.98 N 4789.46 W 6017703.66 N 564386.93 E 9.008 5040.92
8301.30 85.430 293.000 4248.47 4307.02 1591.22 N 4833.52 W 6017721.50 N 564342.72 E 6.067 5088.50
8351.92 85.180 291.090 4252.61 4311.16 1610.16 N 4880.27 W 6017740.00 N 564295.78 E 3.793 5138.86
20 May, 2004 - 15:54 Page 3 of6 DrillQuest 3.03.06.002
Halliburton Sperry-Sun
Survey Report for Milne Point MPE - MPE-20AL 1 MWD
Your Ref: API 500292256160
Job No. AKMW3034600, Surveyed: 5 May, 2004
BPXA
Milne Point Unit
Measured True Sub-Sea Vertical Local Coordinates Global Coordinates Dogleg Vertical
Depth Incl. Azim. Depth Depth Northings Eastings Northings Eastings Rate Section Comment
(ft) (ft) (ft) (ft) (ft) (ft) (ft) (o/100ft)
8394.92 87.280 289.570 4255.44 4313.99 1625.06 N 4920.51 W 6017754.53 N 564255.41 E 6.024 5181.75
8428.68 88.020 290.040 4256.82 4315.37 1636.49 N 4952.24 W 6017765.66 N 564223.57 E 2.596 5215.47
8463.25 87.960 287.840 4258.04 4316.59 1647.71 N 4984.92 W 6017776.57 N 564190.80 E 6.362 5250.02
8488.65 88.830 286.000 4258.75 4317.30 1655.09 N 5009.21 W 6017783.73 N 564166.44 E 8.010 5275.40
8523.30 90.860 284.730 4258.84 4317.39 1664.27 N 5042.62 W 6017792.60 N 564132.95 E 6.911 5309.98 e
8588.78 92.100 281.680 4257.15 4315.70 1679.23 N 5106.34 W 6017806.96 N 564069.09 E 5.027 5375.13
8629.92 92.720 281.320 4255.42 4313.97 1687.42 N 5146.61 W 6017814.78 N 564028.74 E 1.742 5415.91
8681.16 90.000 281.410 4254.20 4312.75 1697.51 N 5196.83 W 6017824.41 N 563978.43 E 5.311 5466.70
8733.17 91.300 283.390 4253.61 4312.16 1708.68 N 5247.62 W 6017835.10 N 563927.54 E 4.554 5518.39
8773.35 88.950 284.500 4253.53 4312.08 1718.36 N 5286.61 W 6017844.42 N 563888.46 E 6.468 5558.43
8831.57 91.420 285.610 4253.34 4311.89 1733.48 N 5342.83 W 6017859.02 N 563832.1 0 E 4.651 5616.52
8873.83 88.830 287.730 4253.25 4311.80 1745.60 N 5383.31 W 6017870.77 N 563791.51 E 7.920 5658.75
8926.95 87.590 289.540 4254.90 4313.45 1762.57 N 5433.61 W 6017887.26 N 563741.05 E 4.129 5711.84
8973.97 87.530 291.790 4256.91 4315.46 1779.15 N 5477.57 W 6017903.43 N 563696.95 E 4.783 5758.79
9024.42 86.850 292.550 4259.38 4317.93 1798.16 N 5524.23 W 6017922.01 N 563650.11 E 2.020 5809.08
9069.30 87.840 292.920 4261.46 4320.01 1815.49 N 5565.58 W 6017938.95 N 563608.60 E 2.355 5853.81
9118.34 90.990 293.330 4261.96 4320.51 1834.74 N 5610.67 W 6017957.79 N 563563.33 E 6.477 5902.69
9164.70 91.110 293.890 4261.11 4319.66 1853.31 N 5653.14 W 6017975.96 N 563520.69 E 1.235 5948.88
9213.46 91.540 295.590 4259.98 4318.53 1873.71 N 5697.41 W 6017995.95 N 563476.23 E 3.595 5997.35
9260.82 90.800 298.960 4259.02 4317.57 1895.40 N 5739.49 W 6018017.25 N 563433.95 E 7.284 6044.17
9311.67 91.610 300.550 4257.95 4316.50 1920.63 N 5783.63 W 6018042.07 N 563389.59 E 3.509 6094.07
9357.18 90.930 302.860 4256.94 4315.49 1944.54 N 5822.33 W 6018065.62 N 563350.66 E 5.290 6138.40 e
9406.25 90.000 302.320 4256.54 4315.09 1970.97 N 5863.67 W 6018091.66 N 563309.08 E 2.192 6186.04
9454.13 90.060 303.590 4256.51 4315.06 1997.02 N 5903.85 W 6018117.33 N 563268.66 E 2.655 6232.45
9504.32 88.700 303.020 4257.06 4315.61 2024.57 N 5945.79 W 6018144.50 N 563226.46 E 2.938 6281.02
9548.83 89.260 301.290 4257.85 4316.40 2048.26 N 5983.47 W 6018167.83 N 563188.57 E 4.085 6324.31
9585.39 91.600 301.750 4257.57 4316.12 2067.37 N 6014.63 W 6018186.65 N 563157.23 E 6.523 6359.96
9642.35 92.280 300.800 4255.65 4314.20 2096.92 N 6063.28 W 6018215.75 N 563108.30 E 2.050 6415.53
9694.20 92.470 297.760 4253.50 4312.05 2122.26 N 6108.46 W 6018240.67 N 563062.89 E 5.869 6466.45
9739.99 93.330 295.550 4251.18 4309.73 2142.77 N 6149.33 W 6018260.80 N 563021.83 E 5.173 6511.74
9777.22 94.380 293.310 4248.68 4307.23 2158.13 N 6183.15 W 6018275.85 N 562987.87 E 6.632 6548.70
9838.46 95.630 292.150 4243.33 4301.88 2181.71 N 6239.42 W 6018298.90 N 562931.39 E 2.780 6609.56
9886.08 92.960 292.030 4239.77 4298.32 2199.56 N 6283.41 W 6018316.34 N 562887.23 E 5.613 6656.96
9935.05 89.380 292.330 4238.77 4297.32 2218.04 N 6328.74 W 6018334.40 N 562841.73 E 7.336 6705.82
9984.19 89.260 292.350 4239.35 4297.90 2236.72 N 6374.19 W 6018352.66 N 562796.11 E 0.248 6754.86
20 May, 2004 - 15:54 Page 4 of6 Dril/Quest 3.03.06.002
'. -
Halliburton Sperry-Sun
Survey Report for Milne Point MPE - MPE-20AL 1 MWD
Your Ref: API 500292256160
Job No. AKMW3034600, Surveyed: 5 May, 2004
BPXA
Milne Point Unit
Measured True Sub-Sea Vertical Local Coordinates Global Coordinates Dogleg Vertical
Depth Incl. Azim. Depth Depth Northings Eastings Northings Eastings Rate Section Comment
(ft) (ft) (ft) (ft) (ft) (ft) (ft) (0/100ft)
10027.20 90.620 294.630 4239.40 4297.95 2253.86 N 6413.63 W 6018369.43 N 562756.51 E 6.172 6797.72
10079.79 90.120 295.760 4239.06 4297.61 2276.25 N 6461.22 W 6018391.38 N 562708.72 E 2.350 6849.97
10126.64 91.360 296.160 4238.45 4297.00 2296.75 N 6503.34 W 6018411.49 N 562666.42 E 2.781 6896.44
10175.83 91.300 297.100 4237.31 4295.86 2318.80 N 6547.30 W 6018433.12 N 562622.25 E 1.914 6945.15
10220.75 92.280 296.170 4235.91 4294.46 2338.92 N 6587.43 W 6018452.88 N 562581.94 E 3.007 6989.62 e
10269.38 93.890 293.720 4233.29 4291.84 2359.40 N 6631.45 W 6018472.95 N 562537.72 E 6.022 7037.89
10316.01 93.830 293.760 4230.15 4288.70 2378.13 N 6674.04 W 6018491.28 N 562494.96 E 0.155 7084.24
10368.79 92.220 293.190 4227.37 4285.92 2399.13 N 6722.38 W 6018511.82 N 562446.43 E 3.235 7136.76
10413.04 93.950 294.310 4224.98 4283.53 2416.92 N 6762.82 W 6018529.24 N 562405.82 E 4.655 7180.78
10457.42 91.360 294.820 4222.93 4281.48 2435.35 N 6803.14 W 6018547.30 N 562365.34 E 5.948 7224.87
10507.37 93.950 297.200 4220.61 4279.16 2457.23 N 6847.98 W 6018568.75 N 562320.30 E 7.038 7274.36
10559.60 91.540 300.000 4218.11 4276.66 2482.20 N 6893.77 W 6018593.30 N 562274.27 E 7.068 7325.75
10604.46 89.810 300.660 4217.58 4276.13 2504.85 N 6932.49 W 6018615.59 N 562235.35 E 4.127 7369.69
10655.02 90.310 298.900 4217.53 4276.08 2529.96 N 6976.37 W 6018640.29 N 562191.24 E 3.619 7419.31
10701.63 91.360 295.850 4216.85 4275.40 2551.38 N 7017.75 W 6018661.33 N 562149.66 E 6.920 7465.38
10751.54 91.480 294.410 4215.62 4274.17 2572.57 N 7062.92 W 6018682.10 N 562104.29 E 2.894 7514.96
10792.66 92.470 293.550 4214.20 4272.75 2589.27 N 7100.47 W 6018698.45 N 562066.59 E 3.188 7555.88
10845.11 93.640 291.430 4211.40 4269.95 2609.31 N 7148.86 W 6018718.04 N 562018.02 E 4.612 7608.14
10885.87 94.510 291.040 4208.51 4267.06 2624.03 N 7186.75 W 6018732.41 N 561979.99 E 2.338 7648.76
10943.50 96.440 291.530 4203.01 4261.56 2644.86 N 7240.20 W 6018752.74 N 561926.35 E 3.454 7706.07
10980.77 96.060 291.350 4198.95 4257.50 2658.40 N 7274.69 W 6018765.96 N 561891.74 E 1.127 7743.07
11 008.45 95.870 292.190 4196.07 4254.62 2668.61 N 7300.25 W 6018775.93 N 561866.08 E 3.095 7770.56 e
....11078.00 95.870 292.190 4188.96 4247.51 .. 2694.74 N 7364.32 W 6018801.46 N 561801.78 E 0.000 7839.62 Projected Survey
All data is in Feet (US Survey) unless otherwise stated. Directions and coordinates are relative to True North.
Vertical depths are relative to Well Reference. Northings and Eastings are relative to Well Reference.
Global Northings and Eastings are relative to NAD27 Alaska State Planes, Zone 4.
The Dogleg Severity is in Degrees per 100 feet (US Survey).
Vertical Section is from Well Reference and calculated along an Azimuth of 288.730° (True).
Based upon Minimum Curvature type calculations, at a Measured Depth of 11078.00ft.,
The Bottom Hole Displacement is 7841.86ft., in the Direction of 290.099° (True).
20 May, 2004 - 15:54
Page 50f6
DrillQuest 3.03.06.002
~ -
Halliburton Sperry-Sun
Survey Report for Milne Point MPE - MPE-20AL 1 MWD
Your Ref: API 500292256160
Job No. AKMW3034600, Surveyed: 5 May, 2004
BPXA
Milne Point Unit
Comments
Measured
Depth
(ft)
Station Coordinates
TVD Northings Eastings
(ft) (ft) (ft)
Comment
5257.76
5274_00
11078.00
4278.74
4283.17
4247.51
920.47 N
929.49 N
2694.74 N
1917.85 W
1930.60 W
7364.32 W
Tie On Point
Window Point
Projected Survey
e
Survey tool program for MPE-20AL 1 MWD
From
Measured Vertical
Depth Depth
(ft) (ft)
To
Measured Vertical
Depth Depth Survey Tool Description
(ft) (ft)
0.00
0.00 11078.00
4247.51 MWD Magnetic (MPE-20)
e
20 May, 2004 - 15:54
Page 60f6
DrillQuest 3.03.06.002
.
.
24-May-04
AOGCC
Howard Okland
333 W. 7th Ave. Suite 100
Anchorage, AK 99501
DEFINITIVE
Re: Distribution of Survey Data for Well MPE-20A L 1 PB1
Dear Dear Sir/Madam:
Enclosed are two survey hard copies and one disk with the *.PTT and *.PDF
files.
Tie-on Survey:
Window / Kickoff Survey:
Projected Survey:
5,257.76' MD
5,274.00' MD
6,067.00' MD
(if applicable)
PLEASE ACKNOWLEDGE RECEIPT BY SENDING AN EMAIL TO
CARL.ULRICH@HALLlBURTON.COM OR SIGNING AND
RETURNING A COPY OF THE TRANSMITTAL LETTER TO THE
ATTENTION OF:
Sperry-Sun Drilling Services
AUn: Carl Ulrich
6900 Arctic Blvd.
Anchorage, AK 99518
Date ~J~'i
Signed
~ ðJt.J
Please call me at 273-3545 if you have any questions or concerns.
Regards,
William T. Allen
Survey Manager
Attachment(s)
~t>ûL-Ðç-r
,
Halliburton Sperry-Sun
Milne Point Unit
BPXA
Milne Point MPE
MPE-20AL1PB1
Job No. AKZZ3034600, Surveyed: 2 May, 2004
Survey Report
20 May, 2004
Your Ref: API 500292256170
Surface Coordinates: 6016175.23 N, 569190.80 E (70027'16.3793- N, 149026' 07.3457- W)
Grid Coordinate System: NAD27 Alaska State Planes, Zone 4
Surface Coordinates relative to Project H Reference: 1016175.23 N, 69190.80 E (Grid)
Surface Coordinates relative to Structure Reference: 2378.77 N, 227.84 W (True)
Kelly Bushing Elevation: 58.55ft above Mean Sea Level
Kelly Bushing Elevation: 58.55ft above Project V Reference
Kelly Bushing Elevation: 58. 55ft above Structure Reference
SpE!!í'í'Y-SUr,
DRIL..L..ING SERVICe!!S
A Halliburton Company
~ -
DEFINITIVE
e
e
Survey Ref: svy1396
~.
Halliburton Sperry-Sun
< Survey Report for Milne Point MPE - MPE-20AL 1 PS1
Your Ref: API 500292256170 ,
Job No. AKZZ3034600, Surveyed: 2 May, 2004
SPXA
Milne Point Unit
Measured True Sub-Sea Vertical Local Coordinates Global Coordinates Dogleg Vertical
Depth Incl. Azim. Depth Depth Northings Eastings Northings Eastings Rate Section Comment
(ft) (ft) (ft) (ft) (ft) (ft) (ft) (o/100ft)
5257.76 73.730 303.120 4220.11 4278.66 898.98 N 1930.55 W 6017056.24 N 567251.99 E 2116.98 Tie On Point
5274.00 74.610 303.120 4224.54 4283.09 907.51 N 1943.63 W 6017064.66 N 567238.82 E 5.419 2132.11 Window Point
5324.87 77.370 302.080 4236.86 4295.41 934.10 N 1985.21 W 6017090.86 N 567197.00 E 5.777 2180.03
5361.24 76.930 301.330 4244.94 4303.49 952.74 N 2015.38 W 6017109.21 N 567166.66 E 2.346 2214.58
5390.35 77.880 300.730 4251.29 4309.84 967.38 N 2039.72 W 6017123.63 N 567142.18 E 3.834 2242.34 e
5421.09 80.210 300.100 4257.13 4315.68 982.66 N 2065.75 W 6017138.66 N 567116.02 E 7.842 2271.89
5453.98 82.820 299.430 4261.99 4320.54 998.81 N 2093.98 W 6017154.55 N 567087.63 E 8.187 2303.82
5487.77 85.430 298.740 4265.44 4323.99 1015.14 N 2123.35 W 6017170.61 N 567058.11 E 7.987 2336.88
5517.79 88.830 298.120 4266.95 4325.50 1029.41 N 2149.72 W 6017184.64 N 567031.62 E 11.512 2366.43
5551.49 91.480 297.430 4266.86 4325.41 1045.12N 2179.53 W 6017200.06 N 567001.66 E 8.126 2399.71
5584.06 91.480 296.760 4266.02 4324.57 1059.95 N 2208.52 W 6017214.62 N 566972.53 E 2.056 2431.92
5614.57 91.670 296.140 4265.18 4323.73 1073.53 N 2235.82 W 6017227.95 N 566945.10 E 2.125 2462.14
5645.78 91.730 295.500 4264.25 4322.80 1087.12 N 2263.90 W 6017241.28 N 566916.90 E 2.059 2493.10
5679.78 91.910 294.800 4263.17 4321.72 1101.56 N 2294.67 W 6017255.43 N 566886.00 E 2.125 2526.87 - ~\-\ c;..~~~~
5710.38 94.690 282.840 4261.40 4319.95 1111.40 N 2323.52 W 6017265.01 N 566857.05 E 40.060 2557.36
5760.90 93.830 283.170 4257.65 4316.20 1122.74 N 2372.61 W 6017275.89 N 566807.86 E 1.823 2607.49 5<O<;S-#~
5806.60 93.890 283.730 4254.57 4313.12 1133.34 N 2416.96 W 6017286.08 N 566763.42 E 1.230 2652.89 -~
5857.01 94.320 286.190 4250.97 4309.52 1146.32 N 2465.53 W 6017298.61 N 566714.73 E 4.942 2703.06 \OC::.\~ s.~}1 ~ l.. ~
5902.36 93.270 285.440 4247.96 4306.51 1158.65 N 2509.07 W 6017310.53 N 566671.08 E 2.843 2748.25
5953.13 93.890 285.360 4244.79 4303.34 1172.11 N 2557.92 W 6017323.53 N 566622.11 E 1.231 2798.83 0-\- ~ \ç..
5998.09 92.650 286.780 4242.23 4300.78 1184.53 N 2601.05 W 6017335.56 N 566578.86 E 4.189 2843.67
6067.00 92.650 286.780 4239.04 4297.59 1204.41 N 2666.95 W 6017354.82 N 566512.78 E 0.000 2912.47 Projected Survey e
All data is in Feet (US Survey) unless otherwise stated. Directions and coordinates are relative to True North.
Vertical depths are relative to Well Reference. Northings and Eastings are relative to Well Reference.
Global Northings and Eastings are relative to NAD27 Alaska State Planes, Zone 4.
The Dogleg Severity is in Degrees per 100 feet (US Survey).
Vertical Section is from Well Reference and calculated along an Azimuth of 288.730° (True).
Based upon Minimum Curvature type calculations, at a Measured Depth of 6067.00ft.,
The Bottom Hole Displacement is 2926.30ft., in the Direction of 294.304° (True).
20 May, 2004 - 15:46
Page 2 of 3
DrillQuest 3.03.06.002
Milne Point Unit
Comments
Measured
Depth
(ft)
5257.76
5274.00
6067.00
-'
~ .
Halliburton Sperry-Sun
Survey Report for Milne Point MPE - MPE-20AL 1 PS1
Your Ref: API 500292256170
Job No. AKZZ3034600, Surveyed: 2 May, 2004
SPXA
Station Coordinates
TVD Northings Eastings
(ft) (ft) (ft)
4278.66
4283.09
4297.59
Comment
898.98 N
907.51 N
1204.41 N
Tie On Point
Window Point
Projected Survey
e
1930.55 W
1943.63 W
2666.95 W
Survey tool program for MPE-20AL 1 PB1
From
Measured Vertical
Depth Depth
(ft) (ft)
0.00
2416.98
20 May, 2004 - 15:46
0.00
2394.70
To
Measured Vertical
Depth Depth Survey Tool Description
(ft) (ft)
2416.98
6067.00
2394.70 MWD Magnetic (MPE-20)
4297.59 AK-6 BP _IFR-AK - MWD+IIFR+MS (MPE-20A)
e
Page 3 of 3
DrillQuest 3.03.06.002
.
.
24-May-04
AOGCC
Howard Okland
333 W. 7th Ave. Suite 100
Anchorage, AK 99501
Re: Distribution of Survey Data for Well MPE-20A L 1 PB1 MWD
Dear Dear Sir/Madam:
Enclosed are two survey hard copies and one disk with the *.PTT and *.PDF
files.
Tie-on Survey:
Window / Kickoff Survey:
Projected Survey:
5,257.76' MD
5,274.00' MD
6,067.00' MD
(if applicable)
PLEASE ACKNOWLEDGE RECEIPT BY SENDING AN EMAIL TO
CARL.ULRICH@HALLlBURTON.COM OR SIGNING AND
RETURNING A COPY OF THE TRANSMITTAL LETTER TO THE
ATTENTION OF:
Sperry-Sun Drilling Services
Attn: Carl Ulrich
6900 Arctic Blvd.
Anchorage, AK 99518
Date q Jw.- )JJI '{
Signed
~ n,L¿J
Please call me at 273-3545 if you have any questions or concerns.
Regards,
William T. Allen
Survey Manager
Attachment(s)
~ Ó Vi... O,ç"-
~
Halliburton Sperry-Sun
Milne Point Unit
BPXA
Milne Point MPE
MPE-20AL1PB1 MWD
e
Job No. AKMW3034600, Surveyed: 2 May, 2004
Survey Report
20 May, 2004
Your Ref: API 500292256170
Surface Coordinates: 6016175.23 N, 569190.80 E (70027'16.3793" N, 149026' 07.3457" W)
Grid Coordinate System: NAD27 Alaska State Planes, Zone 4
e
Surface Coordinates relative to Project H Reference: 1016175.23 N, 69190.80 E (Grid)
Surface Coordinates relative to Structure Reference: 2378.77 N, 227.84 W (True)
Kelly Bushing Elevation: 58. 55ft above Mean Sea Level
Kelly Bushing Elevation: 58. 55ft above Project V Reference
Kelly Bushing Elevation: 58.55ft above Structure Reference
SpE!............y-SUf1
DR t L L t N G5E,::'RVfc e 5
A Halliburton Company
Survey Ref: svy1397
~ Halliburton Sperry-Sun
Survey Report for Milne Point MPE - MPE-20AL 1 PS1 MWD
Your Ref: API 500292256170
Job No. AKMW3034600, Surveyed: 2 May, 2004
BPXA
Milne Point Unit
Measured True Sub-Sea Vertical Local Coordinates Global Coordinates Dogleg Vertical
Depth Incl. Azim. Depth Depth Northings Eastings N<3rthiogs Eastings Rate Section Comment
1ft) (ft) 1ft) (ft) (ft) 1ft) (ft) (0/100ft)
5257.76 73.730 307.410 4220.19 4278.74 920.47 N 1917.85 W 6017Q77.85 N 567264.48 E 2111.86 Tie On Point
5274.00 74.610 303.120 4224.62 4283.17 929.49 N 1930.60 W 6017086.75 N 567251.65 E 25.985 2126.83 WindQw Point
5324.87 77.370 302.080 4236.93 4295.48 956.07 N 1972.18 W 6017112.95 N 567209.82 E 5.777 2174.74
5361.24 76.930 301.330 4245.02 4303.57 974.71 N 2002.35 W 6017131.30 N 567179.49 E 2.346 2209.30
5390.35 77.880 300.73Q 4251.37 4309.92 989.35 N 2026.69 W 6017145.72 N 567155.01 E 3.834 2237.05 e
5421.09 80.210 300.100 4257.21 4315.76 1004.63 N 2052.72 W 6017160.75 N 567128.84 E 7.842 2266.61
5453.98 82.820 299.430 4262.06 4320.61 1020.78 N 2080.95 W 6017176.64 N 567100.46 E 8.187 2298.53
5487.77 85.430 298.740 4265.52 4324.07 1037.12 N 2110.33 W 6017192.70 N 567070.93 E 7.987 2331.59
5517.79 88.830 298.120 4267.02 4325.57 1051.39 N 2136.69 W 6017206.73 N 567044.44 E 11.512 2361.14
5551 .49 91 .480 297.430 4266.93 4325.48 1067.09 N 2166.50 W 6017222.15 N 567014.48 E 8.126 2394.42
5584.06 91.480 300.500 4266.09 4324.64 1082.86 N 2194.98 W 6017237.66 N 566985.85 E 9.423 2426.46
5614.57 91.670 296.420 4265.25 4323.80 1097.39 N 2221.79 W 6017251.94 N 566958.91 E 13.382 2456.51
5645.78 91.730 293.090 4264.33 4322.88 1110.45 N 2250.12 W 6017264.73 N 566930.47 E 10.667 2487.53
5679.78 91.910 287.810 4263.25 4321.80 1122.32 N 2281.95 W 6017276.31 N 566898.53 E 15.531 2521.49 _ ~'r\.<;;~~
5710.38 94.690 288.960 4261.48 4320.03 1131.95N 2310.93 W 6011285.67 N 566869.45 E 9.829 2552.03
5760.90 93,830 289.160 4257.73 4316.28 1148.40 N 2358.55 W 6017301.68 N 566821.68 E 1.747 2602.41 6roq~!fbt
5806.60 93.890 288.280 4254.65 4313.20 1163.04 N 2401,74W 6017315.91 N 566778.37 E 1.926 2648.01
5857.01 94.320 289.450 4251.05 4309.60 1179.29 N 2449.31 W 6017331.73 N 566730.64 E 2.467 2698.29 \a~ ~ ~""J' -"') t \'"5
5902.36 93.270 289.160 4248.04 4306.59 1194.25 N 2492.02 W 6017346.29 N 566687.80 E 2.402 2743.53
5953.13 93.890 289.130 4244.87 4303,42 1210.87 N 2539.89 W 6017362.46 N 566639.78 E 1.223 2794.20 0-\. ~Ç) \t
5998.09 92.650 288.730 4242.31 4300.86 1225.43 N 2682.35 W 6017376.63 N 566597.18 E 2.898 2839.09
6067.00 92.650 288.730 4239.12 4297.67 1247.54 N 2647.54 W 6017398.13 N 566531.79 E 0.000 2907.93 Projected Survey e
All data is ín Feet (US Survey) unless otherwise stated. Diredion!S and coordinates ara relative to Trua North.
Vertical depths are relative to Well Reference. Northings and Eastings are relativa to Well Reference.
Global Northiligs and Eastings are relative to NAD27 Alaska State Planes, Zone 4.
The Dogleg Severity is in Degrees per 100 feet (US Survey).
Vertìcal Section is from Well Reference and calculated along an Azimuth of 288.730° (True).
Based upon Minimum Curvature type calculations, at a Measured Depth of 6067.00ft.,
The Bottom Hole Displacement is 2926.74ft.. ili the Direction of 295.230· (True).
20 May, 2004 - 15:48
Page 20f3
DrmQuest 3.03.06.002
(
Milne Point Unit
Comments
Measured
Depth
(ft)
5257.76
5274.00
6067.00
Halliburton Sperry-Sun
Survey Report for Milne Point MPE - MPE-20AL 1 PS1 MWD
Your Ref: API 500292256170
Job No. AKMW3034600, Surveyed: 2 May, 2004
SPXA
Station Coordinates
TVD Northings Eastings
(ft) (ft) (ft)
4278.74
4283.17
4297.67
Comment
920.47 N
929.49 N
1247.54 N
e
1917.85 W
1930.60 W
2647.54 W
Tie On Point
Window Point
Projected Survey
Survey tool program for MPE-20AL 1 PB1 MWD
From
Measured Vertical
Depth Depth
(ft) (ft)
0.00
20 May, 2004 - 15:48
0.00
To
Measured Vertical
Depth Depth Survey Tool Description
(ft) (ft)
6067.00
4297.67 MWD Magnetic (MPE-20)
e
Page 3 of3
DrillQuest 3.03.06.002
If
e
WELL LOG TRANSMITIAL
To: State of Alaska
Alaska Oil and Gas Conservation Comm.
Attn.: Robin Deason
333 West 7th Avenue, Suite 100
Anchorage, Alaska 99501
June 16, 2004
RE: MWD Formation Evaluation Logs MPE-20A L1,
AK-MW-3034600
1 LIS fonnatted Disc with verification listing.
~I#: 50-029-22561-60
I ). S'" 1'7
PLEASE ACKNOWLEDGE RECEIPT BY SIGNING A COPY OF THE TRANSMITTAL LETTER TO THE
ATTENTION OF:
Sperry-Sun
Attn: Rob Kalish
6900 Arctic Blvd.
Anchorage, Alaska 99518
BP Exploration (Alaska) Inc.
Petro-technical Data Center LR2-1
900 E. Benson Blvd.
Anchorage, Alaska 99649-6612
Date: ~8~)òlJ \.1
Si~ ~ oW
~ D L{ - ~ ~'- ~
-
e
WELL WG TRANSMI1TAL
To: State of Alaska
Alaska Oil and Gas Conservation Comm.
Attn.: Robin Deason
333 West 7th Avenue, Suite 100
Anchorage, Alaska 99501
June 16, 2004
RE: MWD Formation Evaluation Logs ~E-20ALl PB1,
AK-MW-3034600
1 LIS formatted Disc with verification listing.
~I#: 50-029-22561-70
\). ~-l~
PLEASE ACKNOWLEDGE RECEIPT BY SIGNING A COPY OF THE TRANSMITTAL LETTER TO THE
ATTENTION OF:
Sperry-Sun
Attn: Rob Kalish
6900 Arctic Blvd.
Anchorage, Alaska 99518
BP Exploration (Alaska) Inc.
Petro-technical Data Center LR2-1
900 E. Benson Blvd.
Anchorage, Alaska 99649-6612
Date:) 8 J VI¡vt :J- G ~'~
Signed:
1L.J.oUJ
^O '1- \)}" i
.
rnJF !Æ~!Æ~~~!Æ
.
~ 14ASHA. OIL A1Q) GAS
CONSERVATION COMMISSION
FRANK H. MURKOWSKI, GOVERNOR
333 W. 7'" AVENUE, SUITE 100
ANCHORAGE, ALASKA 99501-3539
PHONE (907) 279-1433
FAX (907) 276-7542
Matt Green
Drilling Engineer
BP Exploration (Alaska) Inc.
P.O. Box 196612
Anchorage, Alaska 99519-6612
Re: Milne Point Unit MPE-20ALI
BP Exploration (Alaska) Inc.
Permit No: 204-055
Surface Location: 3637' NSL, 1955' WEL, SEC. 25, T13N, RlOE, UM
Bortomhole Location: 780' NSL, 4129' WEL, SEC. 23, T13N, RlOE, (NB)
Dear Mr. Green:
Enclosed is the approved application for permit to redrill the above development well.
This permit to redrill does not exempt you ITom obtaining additional permits or approvals
required by law ITom other governmental agencies, and does not authorize conducting drilling
operations until all other required permits and approvals have been issued. In addition, the
Commission reserves the right to withdraw the permit in the event it was erroneously issued.
Operations must be conducted in accordance with AS 31.05 and Title 20, Chapter 25 of the
Alaska Administrative Code unless the Commission specifically authorizes a variance. Failure
to comply with an applicable provision of AS 31.05, Title 20, Chapter 25 of the Alaska
Administrative Code, or a Commission order, or the terms and conditions of this permit may
result in the revocation or suspension of the permit. Please provide at least twenty-four (24)
hours notice for a representative of the Commission t 'tness any required test. Contact the
Commission's North Slope petroleum field inspector 6593607 (pager).
. e ly'
BY ORDER OF;ruE COMMISSION
DATED thisX day of April, 2004
cc: Department ofFish & Game, Habitat Section w/o encl.
Department of Environmental Conservation w/o encl.
o Drill II Redrill
1 a. Type of work 0 Re-Entry
2. Operator Name:
BP Exploration (Alaska) Inc.
3. Address:
P.O. Box 196612, Anchorage, Alaska 99519-6612
4a. Location of Well (Governmental Section):
Surface:
3637' NSL, 1955' WEL, SEC. 25, T13N, R10E, UM ,/
Top of Productive Horizon:
4928' NSL, 5079' WEL, SEC. 25, T13N, R10E, (NB)
Total Depth:
780' NSL, 4129' WEL, SEC. 23, T13N, R10E, (NB)
4b. Location of Well (State Base Plane Coordinates):
Surface: X-569191 / y-6016175/ Zone-ASP4
16. Deviated Wells:
Kickoff Depth
18.CasingProgral1'l
Size
~?!:r Casing
6;.MöH 4-1/2"
~~t~~
~l~\
I STATE OF ALASKA .
ALAS OIL AND GAS CONSERVATION WMMISSION
PERMIT TO DRILL
20 MC 25.005
1b. Current Well Class 0 Exploratory
o Stratigraphic Test 0 Service
5. Bond: 181 Blanket 0 Single Well
Bond No. 2S100302630-277
6. Proposed Depth:
MD 11037'./ TVD 4245' /
7. Property Designation:
ADL 047437 /
~
~~(
'} r-'
~. :"!
II Development Oil 0 Multiple Zone
o Development Gas 0 Single Zone
11. Well Name and Number:
MPE-20AL 1
12. Field I Pool(s):
Milne Point Unit 1 Schrader Bluff ./
8. Land Use Permit:
13. Approximate Spud Date:
04/10104
14. Distance to Nearest Property:
10100'
9. Acres in Property:
2560
10. KB Elevation KBE = 15. Distance to Nearest Well Within p0o/
(Height above GL): 57.80' feet MPE-20A is 350' away/rom MPC-41
" 17. Maximum Anticipated Pressures in psig (see 20 AAC 25.035)
5613ft Maximum Hole Angle 93° Downhole: 1903'" psig Surface: 1477 /psig
S~tting Pßpth
TÖp >i.<Bottol1'l
Grade Coupling Length MD TVD MD TVD (including stage data)
L-80 BTC 5424' 5613' 4326' 11037' 4245' Sand Screens Liner
Weight
12.6#
19. PRESENT WELL CONDITION SUMMARY (To be completed for Redrill AND Re-entry Operations)
Total Depth MD (ft): Total Depth TVD (ft): Plugs (measured): Depth MD (ft): Depth TVD
4700' 4663' NIA 4637' 4600'
Structural
Conductor 112' 20" 250 sx Arcticset I (Approx.) 112' 112'
Surface 2256' 13-3/8" 784 sx PF 'E', 250 sx 'G', 150 sx PF 'E' 2587' 2561'
Intermediate
Production 4653' 9-5/8" 375 sx Class 'G' 4681' 4644'
Liner 5983' 7-5/8" 576 sx Class 'G' 5983' 4443'
Liner (OA) 3999' 4-1/2" Uncemented Slotted Liner 9832' 4418'
20. Attachments 0 Filing Fee 0 BOP Sketch
o Property Plat 0 Diverter Sketch
IPerfOration Depth TVD (ft): 4275' - 4291'
181 Drilling Program 0 Time vs Depth Plot 0 Shallow Hazard Analysis
o Seabed Report 0 Drilling Fluid Program 181 20 AAC 25.050 Requirements
Perforation Depth MD (ft): 4312' - 4528'
21. Verbal Approval: Commission Representative:
22. I hereby certify that the foregoing is true and correct to the best of my knowledge.
Printed Name Matt Green Title Drilling Engineer
Date:
Contact Matt Green, 564-5581
Signature
Phone
564-5571
Date i
Prepared By Name/Number:
Sondra Stewman, 564-4750
Permit To Drill ,/ API Number:
Number: 2D'7 VçÇ" 50-029-22561-60-00
Conditions of Approval: Samples Required
Hydro Sulfide Measures
o Yes ~o
~es 0 No
Permit Approval
Date:
Mud Log Required
Directional Survey Required
See cover letter for
other requirements
o Yes ðJ"Ño
~es 0 No
Other: Š
T~7-\-
'--
ORIGINAL
BY ORDER OF
THE COMMISSION
Date ¿~d
({u~t ~luPlicate
.
.
Milne Point MPE-20A L 1 Well Permit
I Well Name:
I MPE-20A L 1
Drill and Complete Plan Summary
./
1 Type of Well (service I producer I injector): 1 Multi Lateral Producer "NB" & "OA"
Surface Location: 1642' FNL, (3638' FSL);/1955' FEL;'(3325' FWL), SEC. 25, T13N, R10E ./
E=569190.8 vN=6016175.23 "
358' FNL, (4921' FSL), 4530' FEL, (750' FWL), SEC. 25, T13N, R10E
E=566604 N=6017435 Z=4385'TVO
4788' FNL, (492' FSL), 2977' FEL, (2302' FWL), SEC. 23, T13N, R10E
E=562869 N=6018253 Z=4360' TVO
351' FNL, (4928' FSL), 5079' FEL, (201' FWL), SEC. 25, T13N, R10E
E=566055 N=6017437 Z=4263' TVD
4500' FNL, (780/' FSL);'4129' FEL;-'"(1150' FWL), SEC. 23, T13N, R10E ,./
E=561714 N=6018531 Z=4187' TVD
Target Location:
TOP "OA"
Target Location:
BHL "OA" Well TO
Target Location:
TOP "NB"
Target Location:
BHL "NB" Well TD
I AFE Number: I TBD
1 Estimated Start Date: 11 0-Apr-2004
I Rig: 1 Doyon 14
1 Operating days to complete: 115.0
I MD: 111,0371 .II TVD: 14,245 1 ....
I Max Inc: 193 I
1
I
I KOP: 15,6131 I KBE: 157.81
1
1
I Well Design (conventional, slim hole, etc.): I Conventional Grass Roots ML Producer
I Objective: I
Schrader Bluff NB & OA Sand
Mud Program:
9.875-in Intermediate Hole Mud Properties: LSND Freshwater Mud
Density (ppg) PV I VP I HTHP pH API Filtrate LG Solids
8.8 - 9.3 v 10 - 20 25 - 30 10 - 11 9.0 - 9.5 < 6 < 15
6.125-in Production Hole Mud Properties: OBM
Density (ppg) PV VP HTHP O/w Ratio Elec Stab
9.0 - 9.2 v 15 - 25 18 - 28 < 4.0 80:20 650 - 900
LCM Restrictions: No Organic LCM products in the Schrader Bluff formation
Waste Disposal: NO ANNULAR INJECTION. Drill Cuttings taken to D8-4 disposal site
Call the Pad 4 waste disposal site prior to truck leaving location so the site can be ready to unload
waste. Exempt liquid wastes can be taken to DS-4 or Phillips KRU lR.
1
.
.
Milne Point MPE-20A L 1 Well Permit
Cement Program:
Casing
Size
Basis
7.625-in 29.7-lb/ft L-80 BTC-M intermediate casing
Top of lead cement 500-ft above top of Ugnu-sand. 40% excess over gauge.
Top of tail cement 500-ft MD above top of N-sand. 40% excess over gauge.
Total Cement Wash 5-bbl Water
Vol: 125-bbl
Spacer
Tail
Temp
30-bbl 10.3-lb/gal un-viscosified Alpha Spacer
125-bbl, 576-sx 15.6-lb/gal Premium G - 1.22 ffs/sx
(top of tail at 3,716-ft MD'
""'~":"":",'~4A;;:t~~;·:·"''''''''<¡;:"W·''Þ'"·-·-· '.7J/%S ~~~!!f{{fI!/;;3fflf"0X="';"'~"#:¡T;;."Ø%!{"::~::i":UJþ.~:«
I BHST ::::= 80°F from SOR, BHCT 70°F estimated by
Schlumberger
Evaluation Program:
9.875-in Hole Section:
Open Hole:
Cased Hole:
6.125-in Hole section:
Open Hole:
Cased Hole:
,¡
MWD/GRlRES, IFRlCASANDRA
N/A
/
MWD/GRlRES, ABI/IFRlCASANDRA
N/A
2
.
Formation Markers
Formation Tops
Base Permafrost
TUlC
NA
NB
NC
NE
NF
Top OA
* Based on 55 depths
MOrkb
(ft)
4216
5592
5645
5699
5770
5884
5983
TVDrkb
(ft)
1858
3798
4318
4338
4358
4383
4418
4443
.
Milne Point MPE-20A L 1 Well Permit
Pore Pressure
(psi)
Estimated EMW
(Ib/gal)*
8.35
8.59
8.59
8.59
8.59
8.59
8.59 /
1624
1903
1912
1921
1932
1948
1959
Casin~lTubing Program
Hole Csg/ Wt/Ft Grade Conn Length Top Bottom
Size Tbg O.D. MD / TVDrkb MD / TVDrkb
42-in 20-in 92# H-40 Welded 80-ft O-ft 113-ft /
113-ft
16.0-in 13.375-in 54.5# K-55 BTC-M 2,480- ft O-ft 2,480-ft /
2,456-ft
9.875-in 7.625-in 29.7# L-80 BTC-M 5,983-ft O-ft 5,983-ft /
4,443-ft
6.125-in 4.5-in 12.6# L-80 BTC 3,999-ft 5,833-ft / 9,832-ft /
OA Slotted 4,403-ft 4,418-ft
6.75-in 4.5-in 12.6# L-80 BTC 5,424-ft 5,613-ft / 11,037-ft!
NB Screens 4,326-ft 4,245-ft
Recommended Bit Program
BHA Hole Size Depth (MD) Bit Type Nozzle/Flow rate
1 9.875-in 2,480-ft - 5,983-ft Smith 3-15 & 1-1 0
FGXiCPS
2 6.125-in 5,983-ft - TO Secu rity 3-12
FM2643
3 6.75-in 5,6138-ft - TO Security 3-12
FM2643
3
.
Well Control:
.
Milne Point MPE-20A L 1 Well Permit
Surface hole will be drilled with a diverter.
Intermediate hole:
· Maximum anticipated BHP:
· Maximum surface pressure:
· Planned BOP test pressure:
· Integrity test:
· Kick tolerance:
· Planned completion fluid:
/
1,903-psi @ 4,260-ft TVDrkb - Top of "NA"
1 ,477-psi '@ surface
(Based on BHP and a full column of gas from TD @ 0.1-psi/ft)
3,500-psi.
An FIT to 12.0-lb/gal will be made on the 13.375-in casing
shoe.
53-bbl with 9.1-lb/gal mud.
9.1-lb/gal brine / 6.8-lb/gal Diesel (1 ,800-ft MD).
Drilling Hazards & Contingencies:
Hydrates
· Light to moderate hydrates were encountered on several of the previous E-Pad wells. No ¡,/
drilling problems related to the hydrates were reported.
· Hydrates generally occur just below the Permafrost (+/- 1800 ss) but may be present in
shallower SV sands and also as deep as 3000 ft. Be alert for the possibility of shallow gas
and/or hydrates. Use recommended practices for drilling hydrates. Increase mud wt; Maintain
cool mud « 60 deg F); Limit ROP and reduce pump rate while drilling hydrates; Circulate
connections thoroughly. See Well Program and Recommended Practices for specific
information.
· Another item to watch out for is deeper gravels below the Permafrost or gravels that calve off
within the permafrost and will tend to drop out when the aerated hydrate gas cut mud is being
circulated out. Maintain adequate viscosity. In the past several Milne pt wells have
experienced stuck pipe from this situation.
Lost Circulation
· We do not expect losses while drilling this well.
· Offset wells encountered losses while running and cementing casing.
· Follow the LOST CIRCULATION DECISION MATRIX in the well plan if fluid losses occur while
drilling. Break circulation slowly in all instances and get up to recommended circulating rate
slowly prior to cementing.
Expected Pressures
/
· Maximum reservoir pressure is expected to be (8.59-lb/gal EMW). In this well, the Schrader
Bluff formation will be drilled with 9.1-lb/gal mud.
Pad Data Sheet
· Please Read the E-Pad Data Sheet thoroughly.
4
.
.
Milne Point MPE-20A L 1 Well Permit
Breathing
· N/A
Hydrocarbons
· Hydrocarbons will be encountered in the Ugnu through the Schrader Bluff.
Faults
· A 20-ft DTW fault is expected at 4,200-ft MD in the Ugnu.
· A 15-ft DTE fault is expected at 5,650-ft MD in the Schrader.
· A 20-ft DTE fault is expected at 5,750-ft MD in the Schrader.
Hydrogen Sulphide
· MPE Pad is not designated as an H2S Pad.
· First closest surface hole location H2S level MPE-09 5.8-ppm 2-Feb-2004.
· Second closest surface hole location H2S level MPE-11 6.7-ppm 2-Feb-2004.
· Third closest surface hole location H2S level MPE-14 <2.0-ppm 2-Feb-2004.
· Maximum recorded H2S on Pad MPE-22 46-ppm 1-Feb-2001.
Anti-collision Issues
· There are no anti-collision issues on MPE-20A. ./
Distance to Nearest Property
· MPE-20A is 10,1 OO-ft from the nearest Milne Point property line. ,/
Distance to Nearest Well Within Pool
/...1 (AlB r-r-c.dUð.fl-r)
· MPE-20A is 350-ft from the Schrader-sand penetration in MPC-41. (òll 72JYØJ.Ve4-r)
A I ~
~'30 .61
5
.
.
Milne Point MPE-20A L 1 Well Permit
DRILL & COMPLETION PROCEDURE
Pre-Rig Operations
1. P&A / decomplete well with Nabors 4ES.
2. Cut and pull 9.625-in casing.
3. Set bridge plug in 13.375-in casing at 2,520-ft
Procedure
1. MI/RU Doyon 14
2. NU BOPE, PU 4.0-in drill pipe
3. Run whipstock and mill window in 13.375-in casing.
4. Drill 9.875-in intermediate hole
5. Run and cement 7.625-in casing
6. Drill 6.125-in OA horizontal production hole
7. Run 4.5-in slotted liner
8. Run whipstock and mill window for NB lateral
9. Drill 6.75-in NB horizontal production hole ./
10. Retrieve whipstock
11. Run 4.5-in screens and hang off in 7.625-in casing
12. Displace drilling mud to brine
13. Run 2.875-in ESP completion
14. ND BOPE / NU tree
15. Freeze protect well
16. RD/MO
6
COMPANY DETAILS
REFERENCE INFORMATION
~rdinate (NÆ) Reference: Well Centre: MP&20, True North
Vertical (TVD) Reference: 1)..14 @34.30GL @ 23.5 57.80
Section (VS) Reference; Slot - 20 (O.OON,O.OOE)
Measu~~:O~e£1= ~~im~~~~~@ 23.5 57,80
.~
DI'ULLIIíID JI!I":VIe:elt
BP Amoco
Calculation Method: Minimum Curvature
Error System: ISCWSA
Scan Method; Trav Cylinder North
Error Surface: Elliptical + Casing
Warninl!; Method: Rules Based
o
loao
~orfJ
gOOO
000
Ir
~OOO
6000
(ooo
.5>000
<000 11/
/000 ~
~ '/000
r&
c
~
o
o
~
oS
'"
ð
..
u
'£
.;;
1!
f-<
2400
3000
3600
Vertical Section at 288.03° [600ft/in]
SURVEY PROGRAM
Depth Pm Depth To SurveylPlao
5613.00 11037.17 Planned: MPE-20AL1 wp04 V4
Plan: MPE-ZOALl wp04 (MPE-201PIan MPE-20ALI (NB)
Tool
MWD+IFR+MS
Created By: Ken AJlen
Checked:
Date: 2/11/2004
Date
Reviewed:
Date
WELL DETAILS
N"", +Ni-S +E/-W Northing Basting Latitude Longitude Slot
MPE-20 2378.22 ·227.90 6016174.45 569190.69 70"2T16.372N 149°26'07.349W 20
TARGET DETAILS
N"", TVD +N/-S +FJ·W Northing Basting Shape
MPE-20 Too 4244.80 2426.11 -7455.19 6018531.00 561714.00 Point
MPE-20 T5a 4275.80 2196.80 -6887.24 6018307.00 562284.00 Point
MPE·20 T4a 4317.80 1609.94 -5510.50 6017733.00 563666.00 Point
MPE-20 T2a 4320.80 1291.74 -3124.13 6017437.00 566055.00 Point
MPE-20 T3a 4325.80 1301.54 -4180.18 6017437.00 564999.00 Point
MPE-20T1b 4335.80 1253.77 -2697.42 6017403.00 566482.00 Point
SECTION DETAILS
Sec MD Inc Azi TVD +N/-S +E/-W DLeg TFace VSec Target
1 5613.00 68.07 302.75 4325.77 1111.49 -2270.61 0.00 0.00 2503.11 .
2 5633.00 70.39 302.Q9 4332.86 1121.51 -2286.39 12.00 -15.00 2521.22
3 5892.35 97.78 282.13 4359.60 1216.14 -2522.35 13.00 -37.53 2774.88
4 6045.16 97.78 282.13 4338.90 1247.95 -2670.37 0.00 0.00 2925.48
5 6073.01 95.00 282.13 4335.80 1253.77 -2697.42 10.00 179.98 2953.00 MPE-20T1b
6 6148.02 91.99 275.25 4331.22 1265.06 -2771.38 10.00 -113.44 3026.82
7 6395.08 91.99 275.25 4322.66 1287.64 -3017.26 0.00 0.00 3267.62
8 6502.10 90.00 269.14 4320.80 1291.74 -3124.13 6.00 -107.96 3370.51 MPE-20 TZa
9 6507.29 89.69 269.14 4320.81 1291.66 -3129.32 6.00 -179.90 3375.42
10 7287.90 89.69 269.14 4325.06 1279.93 -3909.83 0.00 0.00 4113.99
11 7559.52 90.00 280.00 4325.80 1301.54 -4180.18 4.00 88.38 4377.76 MPE-20 na
12 7608.32 90.19 281.94 4325.72 1310.83 -4228.09 4.00 84.27 4426.19
13 8645.62 90.19 281.94 4322.19 1525.47 -5242.93 0.00 0.00 5457.64
14 8926.69 91.59 293.10 4317.80 1609.94 -5510.50 4.00 82.81 5738.22 MPE-20 T4a
15 8926.78 91.59 293.10 4317.80 1609.97 -5510.58 4.00 112.25 5738.30
16 10380.89 91.59 293.10 4277.48 2180.33 -6847.56 0.00 0.00 7186.15
17 10423.89 92.90 291.99 4275.80 2196.80 -6887.24 4.00 -40.44 7228.99 MPE-20 T5a
18 11037.17 92.90 291.99 4244.80 2426.11 -7455.19 0.00 0.00 7840.02 MPE-20 T6a
CASING DETAILS
No. TVD MD Name Size
4244.80 11037.16 41/2" 4.500
FORMATION TOP DETAILS
No. TVDPath MDPath Formation
4337.80 5648.31 SBF1-NB
4357.80 5733.64 SBE4-NC
.
6600
7200
COMPANY DETAILS
REFERENCE INFORMATION
Co-ordinate (NÆ) Relèrence; Well Centre: MPE-20, True North
Vertical (TVD) Reference: D-14@34.30GL@23.557.80
Section (VS) Reference: Slot - 20 (O.OON,O.OOE)
Measu~aPc:f:io~~=~ ~~~m~~~@ 23.5 57.80
1Ip&IT'j/-BUn
ø.l'n.],:"I(f4.W:::."J.~".Ill1:."M
BP Amoco
Calculation Method: Minimwn Curvature
Error System: ISCWSA
Scan Method: Trav Cylinder North
Error Surtàce: Elliptical + Casing
Wami~ Method: Rules Based
ø
l
,I
,I
¡P
I
1,#
'#'
#.§'
;0< #' #'
, ~
~
j(~
'>'ooa
~ JfI
/~ ~
280Q-
"/~
" 2100-'
;¡,¡
o
o
t:.
£
..d
'§
~
..d
:i
~ 140Q-
SURVEY PROGRAM
Depth Fm Depth To SurveyJ1>lan
5613.00 11037.17 Planned: MPE-2I1AL1 wp04 V4
Plan: MPE-20ALI wp04 (MPE-20/Plan MPE-20AL1 (NB»
Tool
Created By: Ken Allen
Checked:
Date: 2/11/2004
MWD+JFR+MS
Date
Reviewed:
Date
WELL DETAILS
N.... ~N/-S +EI-W Northing Easting La"""'" wngitude Slot
MPE-211 237822 -227.90 6016174.45 569190.69 7002T16J72N 149"26'07J49W 20
TARGET DETAILS
Nome TVD +Ni-S +EI-W Nortm"" Basting Shap'
MPE-20T6a 4244.80 2426.11 -7455.19 6018531.00 561714.00 Point
MPE-20 T5a 4275.80 2196.80 -6887.24 6018307.00 562284.00 Point
MPE-20 T4a 4317.80 1609.94 -5510.50 6017733.00 563666.00 Pmnt
MPE-20 123 4]20.80 1291.74 -3124.13 60174]7.00 566055.00 Point
MPE-20 1'3a 4325.80 1301.54 -4180.18 6017437.00 564999.00 Point
MPE-20 TIb 4335.80 1253.77 -2697.42 6017403.00 566482.00 Point
MPE-20ALI Poly 43]7.80 1689.24 -5433.76 6017813.00 563742.00 Polygon
SECTION DETAILS
See MD Ine Azi TVD +N/-S +EI-W DLeg IFaee VSee Target
1 5613.00 68.07 302.75 4325.77 1111.49 -2270.61 0.00 0.00 2503.11 .
2 5633.00 70.39 302.09 4332.86 1121.51 -2286.39 12.00 -15.00 2521.22
3 5892.35 97.78 282.13 4359.60 1216.14 -2522.35 13.00 -37.53 2774.88
4 6045.16 97.78 282.13 4338.90 1247.95 -2670.37 0.00 0.00 2925.48
5 6073.01 95.00 282.13 4335.80 1253.77 -2697.42 10.00 179.98 2953.00 MPE-20 Tl b
6 6148.02 91.99 275.25 4331.22 1265.06 -2771.38 10.00 -113.44 3026.82
7 6395.08 91.99 275.25 4322.66 1287.64 -3017.26 0.00 0.00 3267.62
8 6502.10 90.00 269.14 4320.80 1291.74 -3124.13 6.00 -107.96 3370.51 MPE-20 T2a
9 6507.29 89.69 269.14 4320.81 1291.66 -3129.32 6.00 -179.90 3375.42
10 7287.90 89.69 269.14 4325.06 1279.93 -3909.83 0.00 0.00 4113.99
11 7559.52 90.00 280.00 4325.80 1301.54 -4180.18 4.00 88.38 4377.76 MPE-20 TJa
12 7608.32 90.19 281.94 4325.72 1310.83 -4228.09 4.00 84.27 4426.19
13 8645.62 90.19 281.94 4322.19 1525.47 -5242.93 0.00 0.00 5457.64
14 8926.69 91.59 293.10 4317.80 1609.94 -5510.50 4.00 82.81 5738.22 MPE-20 T4a
15 8926.78 91.59 293.10 4317.80 1609.97 -5510.58 4.00 112.25 5738.30
16 10380.89 91.59 293.10 4277.48 2180.33 -6847.56 0.00 0.00 7186.15
17 10423.89 92.90 291.99 4275.80 2196.80 -6887.24 4.00 -40.44 7228.99 MPE-20 T5a
V- 18 11037.17 92.90 291.99 4244.80 2426.11 -7455.19 0.00 0.00 7840.02 MPE-20 T6a
FORMATION TOP DETAILS
No. TVDPath MDPath Fonnation
4337.80 5648.31 SBFI-NB
4357.80 5733.64 SBE4-NC
CASING DETAILS
No. TVD
MD
Name
Size
4244.80 11037.16 41/2"
4.500
.
End Dir : 6507.29' MD, 4320.81' TVD
.08' 4322.66'TVD
TVD
-4900
West(-)/East(+) [700ft/in]
I
-1400
-2100
Ao li;\UU"'ljHo..~ n~fI',\JII\·
. .
Sperry-Sun - Draft Copy
KW A Planning
speililY-5un
DRtL.L.ING SERVICES
Plan: MPE-20AL 1 wp04
Date Composed:
Version:
Tied-to:
1/21/2004
4
From: Definitive Path
Principal: Yes
Field: Milne Point
North Slope
UNITED STATES
Map System:US State Plane Coordinate System 1927
Geo Datum: NAD27 (Clarke 1866)
Sys Datum: Mean Sea Level
Map Zone:
Coordinate System:
Geomagnetic Model:
Alaska, Zone 4
Well Centre
bggm2003
Site: M pt E Pad
TR-13-10
UNITED STATES: North Slope
Site Position: Northing:
From: Map Eastlng:
Position Uncertainty: 0.00 ft
Ground Level: 0.00 ft
6013798.68 ft
569440.72 ft
Latitude: 70 26
Longitude: 149 26
North Reference:
Grid Convergence:
52.982 N
0.655 W
True
0.53 deg
Well: MPE-20 Slot Name:
MPE-20
Well Position: +N/-S 2378.22 ft Northing: 6016174.45 ft Latitude:
+E/-W -227.90 ft Eastlng: 569190.69 ft Longitude:
Position Uncertainty: 0.00 ft
20
70 27 16.372 N
149 26 7.349 W
Wellpath: Plan MPE-20AL 1 (NB)
+N/-S
ft
0.00
Drilled From:
Tie-on Depth:
Above System Datum:
Declination:
Mag Dip Angle:
+E/-W
ft
0.00
MPE-20A (OA Lat.)
5613.00 ft
Mean Sea Level
25.09 deg
80.87 deg
Direction
deg
288.03
Current Datum:
Magnetic Data:
Field Strength:
Vertical Section:
D-14 @ 34.30 GL @ 23.5
1/14/2004
57556 nT
Depth From (TVD)
ft
34.30
Height 57.80 ft
Casing Points
11037.16 4244.80 4.500 6.125 41/2"
Formations
5648.31 4337.80 SBF1-NB
5733.64 4357.80 SBE4-NC
Targets
0.00 0.00
0.00 0.00
MPE-20 T6a 4244.80 2426.11 -7455.19 6018531.00 561714.00 70 27 40.195 N 149 2946.411 W
MPE-20 T5a 4275.80 2196.80 -6887.24 6018307.00 562284.00 70 27 37.945 N 149 29 29.716 W
MPE-20 T4a 4317.80 1609.94 -5510.50 6017733.00 563666.00 70 27 32.185 N 149 28 49.251 W
MPE-20 T2a 4320.80 1291.74 -3124.13 6017437.00 566055.00 70 27 29.069 N 149 2739.134 W
MPE-20 T3a 4325.80 1301.54 -4180.18 6017437.00 564999.00 70 27 29.161 N 149 28 10.160 W
MPE-20 T1b 4335.80 1253.77 -2697.42 6017403.00 566482.00 70 27 28.697 N 149 27 26.597 W
MPE-20AL 1 Poly 4337.80 1689.24 -5433.76 6017813.00 563742.00 70 27 32.965 N 149 28 46.998 W
-Polygon 1 4337.80 1689.24 -5433.76 6017813.00 563742.00 70 27 32.965 N 149 28 46.998 W
-Polygon 2 4337.80 2660.28 -7686.05 6018763.00 561481.00 70 27 42.496 N 149 29 53.201 W
A~8t!l\TOO(:OMI';\N\·
. .
Sperry-Sun - Draft Copy
KW A Planning
=-...._1 '1 ·y-sun
DAILLING SSAVIc:es
Targets
-Polygon 3 4337.80 2459.13 -7779.93 6018561.00 561389.00 70 27 40.517 N 149 29 55.954 W
-Polygon 4 4337.80 1513.53 -5468.39 6017637.00 563709.00 70 27 31.237 N 149 28 48.011 W
-Polygon 5 4337.80 1155.05 -4021.52 6017292.00 565159.00 70 27 27.721 N 149 28 5.496 W
-Polygon 6 4337.80 1017.08 -1980.52 6017173.00 567201.00 70 27 26.372 N 149 27 5.533 W
-Polygon 7 4337.80 1282.09 -1978.06 6017438.00 567201.00 70 27 28.978 N 149 27 5.463 W
-Polygon 8 4337.80 1365.18 -4032.57 6017502.00 565146.00 70 27 29.787 N 149 28 5.824 W
Plan Section Information
5613.00 68.07 302.75 4325.77 1111.49 -2270.61 0.00 0.00 0.00 0.00
5633.00 70.39 302.09 4332.86 1121.51 -2286.39 12.00 11.60 -3.30 -15.00
5892.35 97.78 282.13 4359.60 1216.14 -2522.35 13.00 10.56 -7.69 -37.53
6045.16 97.78 282.13 4338.90 1247.95 -2670.37 0.00 0.00 0.00 0.00
6073.01 95.00 282.13 4335.80 1253.77 -2697.42 10.00 -10.00 0.00 179.98 MPE-20 T1 b
6148.02 91.99 275.25 4331.22 1265.06 -2771.38 10.00 -4.02 -9.18 -113.44
6395.08 91.99 275.25 4322.66 1287.64 -3017.26 0.00 0.00 0.00 0.00
6502.10 90.00 269.14 4320.80 1291.74 -3124.13 6.00 -1.86 -5.71 -107.96 MPE-20 T2a
6507.29 89.69 269.14 4320.81 1291.66 -3129.32 6.00 -6.00 -0.01 -179.90
7287.90 89.69 269.14 4325.06 1279.93 -3909.83 0.00 0.00 0.00 0.00
7559.52 90.00 280.00 4325.80 1301.54 -4180.18 4.00 0.11 4.00 88.38 MPE-20 T3a
7608.32 90.19 281.94 4325.72 1310.83 -4228.09 4.00 0.40 3.98 84.27
8645.62 90.19 281.94 4322.19 1525.47 -5242.93 0.00 0.00 0.00 0.00
8926.69 91.59 293.10 4317.80 1609.94 -5510.50 4.00 0.50 3.97 82.81 MPE-20 T4a
8926.78 91.59 293.10 4317.80 1609.97 -5510.58 4.00 -1.51 3.70 112.25
10380.89 91.59 293.10 4277.48 2180.33 -6847.56 0.00 0.00 0.00 0.00
10423.89 92.90 291.99 4275.80 2196.80 -6887.24 4.00 3.04 -2.60 -40.44 MPE-20 T5a
11037.17 92.90 291.99 4244.80 2426.11 -7455.19 0.00 0.00 0.00 0.00 MPE-20 T6a
Survey
5613.00 68.07 302.75 4325.77 4267.97 6017264.70 566910.08 2503.11 0.00 0.00 0.00 MWD+IFR+II13
5625.00 69.46 302.35 4330.11 4272.31 6017270.63 566900.59 2513.94 11.18 12.00 345.00 MWD+IFR+\A3
5633.00 70.39 302.09 4332.86 4275.06 6017274.58 566894.20 2521.22 18.70 12.00 345.14 MWD+IFR+\A 3
5648.31 71.97 300.81 4337.80 4280.00 6017282.02 566881.76 2535.32 33.19 13.00 322.47 MPE-20AL 1 F oly
5650.00 72.15 300.67 4338.32 4280.52 6017282.83 566880.38 2536.88 34.80 13.00 322.88 MWD+IFR+\A 3
5675.00 74.75 298.64 4345.44 4287.64 6017294.49 566859.45 2560.35 58.76 13.00 322.92 MWD+IFR+ \A 3
5700.00 77.37 296.66 4351.46 4293.66 6017305.54 566837.86 2584.27 83.02 13.00 323.50 MWD+IFR+ \A 3
5725.00 80.00 294.72 4356.37 4298.57 6017315.96 566815.67 2608.56 107.53 13.00 323.98 MWD+IFR+ \A 3
5733.64 80.92 294.06 4357.80 4300.00 6017319.41 566807.88 2617.03 116.05 13.00 324.36 SBE4-NC
5750.00 82.65 292.81 4360.14 4302.34 6017325.71 566792.97 2633.15 132.25 13.00 324.47 MWD+IFR+\A3
5775.00 85.31 290.93 4362.76 4304.96 6017334.75 566769.81 2657.95 157.10 13.00 324.65 MWD+IFR+\A 3
5800.00 87.96 289.05 4364.23 4306.43 6017343.06 566746.29 2682.89 182.06 13.00 324.84 MWD+IFR+\A 3
5825.00 90.63 287.19 4364.54 4306.74 6017350.61 566722.46 2707.89 207.06 13.00 324.95 MWD+IFR+\A 3
5850.00 93.29 285.32 4363.68 4305.88 6017357.38 566698.42 2732.86 232.04 13.00 324.98 MWD+IFR+\A 3
5875.00 95.94 283.44 4361.67 4303.87 6017363.35 566674.23 2757.72 256.96 13.00 324.91 MWD+IFR+\A 3
5892.35 97.78 282.13 4359.60 4301.80 6017367.00 566657.40 2774.88 274.18 13.00 324.76 MWD+IFR+ \A 3
5900.00 97.78 282.13 4358.56 4300.76 6017368.53 566649.98 2782.41 281.76 0.00 0.00 MWD+IFR+ \A 3
6000.00 97.78 282.13 4345.02 4287.22 6017388.44 566552.93 2880.97 380.84 0.00 0.00 MWD+IFR+\A 3
6045.16 97.78 282.13 4338.90 4281.10 6017397.44 566509.10 2925.48 425.58 0.00 0.00 MWD+IFR+\A 3
6050.00 97.30 282.13 4338.26 4280.46 6017398.40 566504.40 2930.25 430.38 10.00 179.98 MWD+IFR+\A3
6073.01 95.00 282.13 4335.80 4278.00 6017403.00 566482.00 2953.00 453.25 10.00 179.98 MPE-20 T1b
6100.00 93.92 279.65 4333.70 4275.90 6017407.84 566455.53 2979.70 480.16 10.00 246.56 MWD+IFR+ \A 3
6148.02 91.99 275.25 4331.22 4273.42 6017413.61 566407.95 3026.82 528.11 10.00 246.36 MWD+IFR+\A 3
6200.00 91.99 275.25 4329.42 4271.62 6017417.88 566356.17 3077.49 580.07 0.00 0.00 MWD+IFR+\A 3
" tf..\UJ&TWoTONCOft.lPoV'i'I"
. .
Sperry-Sun - Draft Copy
KW A Planning
spel""'l""'y-sun
DRILLING SERVICES
Survey
6300.00 91.99 275.25 4325.95 4268.15 6017426.09 566256.58 3174.95 680.01 0.00 0.00 MWD+IFR+ \113
6395.08 91.99 275.25 4322.66 4264.86 6017433.90 566161.89 3267.62 775.03 0.00 0.00 MWD+IFR+ \II 3
6400.00 91.90 274.97 4322.49 4264.69 6017434.29 566156.99 3272.42 779.95 6.00 252.04 MWD+IFR+ \II 3
6450.00 90.97 272.11 4321.24 4263.44 6017436.91 566107.08 3320.81 829.93 6.00 252.03 MWD+IFR+ \113
6502.10 90.00 269.14 4320.80 4263.00 6017437.00 566055.00 3370.51 882.03 6.00 251.96 MPE-20 T2a
6507.29 89.69 269.14 4320.81 4263.01 6017436.87 566049.81 3375.42 887.22 6.00 180.10 MWD+IFR+ \113
6600.00 89.69 269.14 4321.32 4263.52 6017434.62 565957.14 3463.14 979.93 0.00 0.00 MWD+IFR+\II3
6700.00 89.69 269.14 4321.86 4264.06 6017432.19 565857.18 3557.76 1079.92 0.00 0.00 MWD+IFR+\II3
6800.00 89.69 269.14 4322.41 4264.61 6017429.76 565757.22 3652.37 1179.92 0.00 0.00 MWD+IFR+\II3
6900.00 89.69 269.14 4322.95 4265.15 6017427.33 565657.26 3746.98 1279.92 0.00 0.00 MWD+IFR+\II3
7000.00 89.69 269.14 4323.49 4265.69 6017424.90 565557.30 3841.60 1379.92 0.00 0.00 MWD+IFR+ \113
7100.00 89.69 269.14 4324.04 4266.24 6017422.47 565457.34 3936.21 1479.92 0.00 0.00 MWD+IFR+\II3
7200.00 89.69 269.14 4324.58 4266.78 6017420.04 565357.38 4030.83 1579.92 0.00 0.00 MWD+IFR+\II3
7287.90 89.69 269.14 4325.06 4267.26 6017417.90 565269.52 4113.99 1667.81 0.00 0.00 MWD+IFR+\II3
7300.00 89.70 269.62 4325.12 4267.32 6017417.66 565257.42 4125.46 1679.92 4.00 88.38 MWD+IFR+ \II 3
7400.00 89.82 273.62 4325.54 4267.74 6017419.56 565157.47 4221.37 1779.92 4.00 88.37 MWD+IFR+\II3
7500.00 89.93 277.62 4325.76 4267.96 6017428.43 565057.89 4319.01 1879.91 4.00 88.36 MWD+IFR+\II3
7559.52 90.00 280.00 4325.80 4268.00 6017437.00 564999.00 4377.76 1939.44 4.00 88.35 MPE-20 T3a
7608.32 90.19 281.94 4325.72 4267.92 6017445.84 564951.02 4426.19 1988.23 4.00 84.27 MWD+IFR+ \113
7700.00 90.19 281.94 4325.41 4267.61 6017463.97 564861.16 4517.35 2079.91 0.00 0.00 MWD+IFR+\II3
7800.00 90.19 281.94 4325.07 4267.27 6017483.75 564763.14 4616.79 2179.91 0.00 0.00 MWD+IFR+\II3
7900.00 90.19 281.94 4324.73 4266.93 6017503.54 564665.13 4716.23 2279.91 0.00 0.00 MWD+IFR+\II3
8000.00 90.19 281.94 4324.39 4266.59 6017523.32 564567.12 4815.66 2379.91 0.00 0.00 MWD+IFR+\II3
8100.00 90.19 281.94 4324.05 4266.25 6017543.10 564469.10 4915.10 2479.91 0.00 0.00 MWD+IFR+\II3
8200.00 90.19 281.94 4323.71 4265.91 6017562.88 564371.09 5014.53 2579.91 0.00 0.00 MWD+IFR+ \II 3
8300.00 90.19 281.94 4323.37 4265.57 6017582.66 564273.07 5113.97 2679.91 0.00 0.00 MWD+IFR+ \II 3
8400.00 90.19 281.94 4323.03 4265.23 6017602.44 564175.06 5213.41 2779.91 0.00 0.00 MWD+IFR+ \113
8500.00 90.19 281.94 4322.69 4264.89 6017622.22 564077.05 5312.84 2879.91 0.00 0.00 MWD+IFR+\II3
8600.00 90.19 281.94 4322.35 4264.55 6017642.00 563979.03 5412.28 2979.91 0.00 0.00 MWD+IFR+ \113
8645.62 90.19 281.94 4322.19 4264.39 6017651.02 563934.32 5457.64 3025.52 0.00 0.00 MWD+IFR+\II3
8700.00 90.47 284.10 4321.88 4264.08 6017662.78 563881.23 5511.81 3079.91 4.00 82.81 MWD+IFR+ \113
8800.00 90.97 288.07 4320.63 4262.83 6017689.59 563784.93 5611.72 3179.90 4.00 82.82 MWD+IFR+ \II 3
8900.00 91.46 292.04 4318.51 4260.71 6017722.99 563690.73 5711.62 3279.88 4.00 82.87 MWD+IFR+\II3
8926.69 91.59 293.10 4317.80 4260.00 6017733.00 563666.00 5738.22 3306.56 4.00 82.95 MPE-20 T4a
8926.78 91.59 293.10 4317.80 4260.00 6017733.03 563665.92 5738.30 3306.65 4.00 112.25 MWD+IFR+ \113
9000.00 91.59 293.10 4315.77 4257.97 6017761.12 563598.34 5811.21 3379.84 0.00 0.00 MWD+IFR+ \113
9100.00 91.59 293.10 4313.00 4255.20 6017799.49 563506.04 5910.78 3479.80 0.00 0.00 MWD+IFR+\II3
9200.00 91.59 293.10 4310.22 4252.42 6017837.85 563413.75 6010.35 3579.76 0.00 0.00 MWD+IFR+\II3
9300.00 91.59 293.10 4307.45 4249.65 6017876.21 563321.45 6109.92 3679.72 0.00 0.00 MWD+IFR+\II3
9400.00 91.59 293.10 4304.68 4246.88 6017914.58 563229.15 6209.49 3779.69 0.00 0.00 MWD+IFR+\II3
9500.00 91.59 293.10 4301.91 4244.11 6017952.94 563136.86 6309.06 3879.65 0.00 0.00 MWD+IFR+ \II 3
9600.00 91.59 293.10 4299.13 4241.33 6017991.31 563044.56 6408.63 3979.61 0.00 0.00 MWD+IFR+\II3
9700.00 91.59 293.10 4296.36 4238.56 6018029.67 562952.27 6508.20 4079.57 0.00 0.00 MWD+IFR+\II3
9800.00 91.59 293.10 4293.59 4235.79 6018068.04 562859.97 6607.76 4179.53 0.00 0.00 MWD+IFR+ \113
9900.00 91.59 293.10 4290.82 4233.02 6018106.40 562767.67 6707.33 4279.49 0.00 0.00 MWD+IFR+\II3
10000.00 91.59 293.10 4288.04 4230.24 6018144.77 562675.38 6806.90 4379.45 0.00 0.00 MWD+IFR+\II3
10100.00 91.59 293.10 4285.27 4227.47 6018183.13 562583.08 6906.47 4479.42 0.00 0.00 MWD+IFR+\II3
10200.00 91.59 293.10 4282.50 4224.70 6018221.50 562490.79 7006.04 4579.38 0.00 0.00 MWD+IFR+\II3
10300.00 91.59 293.10 4279.73 4221.93 6018259.86 562398.49 7105.61 4679.34 0.00 0.00 MWD+IFR+ \113
10380.89 91.59 293.10 4277.48 4219.68 6018290.89 562323.83 7186.15 4760.20 0.00 0.00 MWD+IFR+ \II 3
10400.00 92.17 292.61 4276.86 4219.06 6018298.15 562306.16 7205.19 4779.30 4.00 319.56 MWD+IFR+\II3
10423.89 92.90 291.99 4275.80 4218.00 6018307.00 562284.00 7228.99 4803.17 4.00 319.54 MPE-20 T5a
"K.\UJ8\III;TON(",œ.tp~.
. .
Sperry-Sun - Draft Copy
KW A Planning
5pe""""y-5un
DAILLIIIIG seAVlces
Survey
10500.00 92.90 291.99 4271.95 4214.15 6018334.79 562213.26 7304.82 4879.18 0.00 0.00 MWD+IFR+1II3
10600.00 92.90 291.99 4266.90 4209.10 6018371.32 562120.32 7404.45 4979.05 0.00 0.00 MWD+IFR+1II3
10700.00 92.90 291.99 4261.84 4204.04 6018407.84 562027.38 7504.08 5078.92 0.00 0.00 MWD+IFR+ 11I3
10800.00 92.90 291.99 4256.79 4198.99 6018444.37 561934.43 7603.72 5178.79 0.00 0.00 MWD+IFR+1II3
10900.00 92.90 291.99 4251.73 4193.93 6018480.90 561841.49 7703.35 5278.67 0.00 0.00 MWD+IFR+1II3
11000.00 ,;92.90 291.99 4246.68 4188.88 6018517.42 561748.54 7802.99 5378.54 0.00 0.00 MWD+IFR+1II3
11037.17 92.90 291.99 4244.80 v 4187.00 6018531.00 561714.00 7840.02 5415.66 0.00 0.00 MPE-20 T6e.
TREE: Cameron 2-9/16" 5M
WELLHEAD: FMC Gen 5 11",5M
Tubing Head: FMC 11-in x 2.875-in
113'
20" 92 Iblft, H-40 Welded
Insulated
13.375-in 54.5-lblft, K-55, BTC
Casing Drift: 12.459-in
Casing 10: 12.615-in
Coupling 00: 14.375-in
Burst: 2,730-psi
Collapse: 1, 130-psi
2.875-in 6.5-lblft, L-80, 8rd, EUE
Tubing ID: 2.441-in
Tubing Capacity: 0.00579-bbllft
Tensile (100%): 145-k.lbf
Burst: 10,570-psi
Collapse: 13,870-psi
7-5/8" 29.7#, L-80, BTC-M
Casing Drift: 6.75-in
Casing 10: 6.875-in
Coupling 00: 11.75-in
Burst: 6,890-psi
Collapse: 4,790-psi
.PHUP~~~ijil:: lice
~
Window in 7.625-in casing @ 5,613-ft MD
Well Inclination @ Window::: 68 Degrees
9.875-in Hole
4.5-in liner top @ 5,833-ft MD (150-ft lap) ~ ~
7.625" Casing Shoe@5,983-ftMD,4,443-ftTVD ~' ,~
Well Inclination @ Shoe::: 77 Degrees ~ 1....."-
\ '.
,
'-
-- -
DATE
24 Mar 2004
REV. BY
MDG
COMMENTS
Level 3 Multi-Lateral, 2.875-in ESP Completion
Milne Point Unit
WF : MPF-20A
API NO:50-029-?????
~
I KB. (N22E) ELEV = 53.8-ft I
Cellar Box ELEV = 24.7-ft
...
42" Hole
2.875-in x 1.0-in Gas Lift Mandrel @ 116-ft TVD
16" Hole
... 13.375-in Window @ 2,480-ft MD, 2,456-ft TVDrkb
2.875-in x 1.0-in GLM I I
2.975-in XN nipple I I
(ID 2.205")
Pump, 122 stg. GC2200 I I
Tandem Gas Separator I I
Tandem Seal Section I I
GSB3 DB UT/L T IL H6 PFS AflaslHSN
Motor, 171 HP KMH I
2390 volt, 44 amp
PumpMate Sensor
w/6 fin Centralizer
\~ 6.7S-in NB Lateral 111,037-ft MD 1
......
"""- - -
- -
r- - - - - - - - - -
4.0-in Screens w/Hookwall hanger and Swell Packer
6.125-in OA Lateral 18,525-ft MD I
------
- - --
4.5-in Slotted Liner & Hanger
BP
--
MPE-20 Proposed
_ 53.8' (N22E)
GL = 24.7'
RKB (N22E) to 9 5/8" Hng. = 30.8'
Conductor Casing
I 113' I
Existing Cement
KOP @ 1200"
Max Hole Angle: 13.40
@ 2300 MD
13-3/8" , 54.5 ppf,
K-55, Btrc.
2587'
~ t' ~ 13 3/8" EZSV Cement Retainer I
. /X X ~ ;; ~ X X ~ ~ Topof951S"Cas;"" I
// X X X X X X X X >
I~XXXXXXX>
XXX XXX,
XXX XXX:
X X X X X X : Bottom of Cement
9 5/8"" CIBP
-2500'
-2550'
2-7/8" , 6.5 ppf, EUE 8rd tbg.
( capacity = 0.00579 bpf )
-2600'
-2600'
9 5/8" . L-80 production casing
40 ppf NSCC above 4637' MD
47 ppf Btrc below 4637' MD
, H H n , Top of Cement Cap I -4190'
XXX XXX:
XXX XXX:
,"m~ 9 5/8"" EZSV Cement Retainer -4230" I
Stimulation Summary:
'N' Sands: 26,900 Ibs.16-20 X X X X X Xi RA Collar at 4229' WLM RKB
'0' Sands: 73,000 Ibs 16-20 XXX XXX,
Perforation Summary: XXX XXX:
Ref. Log: DLL 6 I 6 I 95 XX , 9-5/8" Halliburton "VTL" Pkr 4249'
X 20 Gauge Halliburton Welded
Size JSPF Interval (TVD) XX 304 SS Wire Wrapped Screen 4310'
4.5" 12 4312' - 4332' XI 9-5/8" Halliburton "VTL Pkr
4365'
4.5" 12 4332' - 4357' X
4.5" 4440' - 4465' X , 4.5" Otis X nipple 3.813" id 4366'
12 X
4.5" 5 4487' - 4490' XX ... 20 Gauge Halliburton Welded 4432'
4.5" 12 4502' - 4528' X 304 SS Wire Wrapped Screen
X 4537'
X 9-5/8" x 4" bore HES "BWD" 4553'
Jumbo Jet ("big hole") 26 gr. charges. X 4.5" Otis XN nipple 3.75" Id
135/45 deg phasing. EHD = 0.74". XXXXXX: 4.5" WLEG 4556'
TIP = 5.8" except for 4487' to 4490' which were XXX XXX: PBTD
32gm..
Alpha Jet wi TTP = 32.1" 0.44" EHD ~Cs9.Shoe
DATE
R :V. BY
COMMENTS
091 02/ 95
09/05/96
JBF
ESP / Frac Pack Completion by N 4ES
diagram update:
MILNE POINT UNIT
Well E-20
API NO: 50-029-22561
M. Under
BP EXPLORATION (AK)
VI
¡
1 6 00 W
I.
¡
49 00 VI
I ¡
W' 149 24
49 1 Ä. 00
Q
ù
e
e
PERMIT TO DRILL
20 MC 25.005
(e) If a well has multiple well branches, each branch requires a separate Permit to Drill. If multiple well
branches are proposed from a single conductor, surface, or production casing, the applicant shall
designate one branch as the primary well bore and include all information required under (c) of this section
with the application for a Permit to Drill for that branch. For each subsequent well branch, the application
for a Permit to Drill need only include information under (c) of this section that is unique to that branch
and need not include the $100 fee.
'.
.
TRANSMIT AL LETTER CHECK LIST
CIRCLE APPROPRIATE LETTER/P ARAGRAPHS TO
BE INCLUDED IN TRANSMITTAL LETTER
WELL NAME 41PU E-zo4 L /
PTD#
2QC¡ -DS-Ç
vÐevelopment
Service
CHECK WHAT
APPLIES
ADD-ONS
(OPTIONS)
MULTI
LATERAL
y/
(If API Dum ber
last two (2) digits
are between 60-69)
\c>-.\x.~ \
Exploration
Stratigraphic
"CLUE"
Tbe permit is for a new wellbore§Fgment of
existing weD m ~t{ E- 20 fl
Permit NO,).ð¥-o~I No. So·oz..~·?--2S6I-ð I
Production. sbould continue to be reported as
a function' of tbe original API number. stated
above.
HOLE In accordance witb 20 AAC 25.005(1), all
records, data and logs acquired for tbe pilot
bole must be clearly differentiated in botb
name (name on permit plus PH)
and API Dumber (50
70/80) from records, data and logs acquired
for well (name on permit).
Pll.,OT
(PH)
SPACING
EXCEPTION
DRY DITCH
SAMPLE
Tbe permit is approved subject ·to fun
compliance with 20 AAC 25.055~ Approval to
perforate and produce is contingent upon
issuance of ~ conservation order approving a
spacing e:Jception.
(Companv Name) assumes tbe liability of any
protest to tbe spacinge:Jception that may
occur.
An dry ditch sample sets submitted to tbe
Commission must be in no greater -tban 30'
sample intervals from below tbe permafrost
or from wbere samples are first caugbt and
10' sample hitervals tbrougb target zones.
f)í(Ç
1j /1-
Date
~~
\
'11µ
, \.
Geologic
Commissioner:
Date:
Engineering
Commissioner:
Public
Cor/missioner
Date
35
36
37
38
39
CQnta_cll'!amelphOl'!eJorweß~ly progre!¡s_reports [explor~tory 9nly]
No
Y_es
NA
NA
NA
Appr
SFD
Date
3/31/2004
S~<lbeØ _col'!ditioo survey
_S~ismic_an<llysis Qf shaJlow gas_zooes
off-!¡h_ore)
(if
Permit can be
D_atapJeseoted on_ pote_ntial oveJpressurßzOl'!e$
producer
expected
reservoir pressure i$8,59 ppg eMW; will be drilled with 9.1
ppgJ11Ud,
Geology
Appr Date
TEM 3/31/2004
4'7\"7;J\
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
issued wlQ hYdr_ogen s_ulfide measjJres
Meçha_nic~'-coodJtlon o{wells withil'! .ð.Oß verified (for_s_ervjce welJ only)
_test to
Choke manifold cQmplie5- w/API RP-53 (May 84)
WQrk will occur
Is presence_ Qf
H2S gas_ probablß
withoutoper~tionshutdown _
they meßt
_BOPE_press ratiog appropriate;
(put
psig in_commel'!ts)
DJilliog
BOPES,_do
reguJaJiol'!
fluid_program sGhßm~tic_& eCl-uip
If divßrter req_uired. dQes
re_serve pit
Jfare-Ørilt has a 10:403 fQr abandOl'!ment
AØequate _well bore sep<lr~tio_n proposed
it meßt
reguJations_
be~o ~pprQvßd
AØeq uate Jank<lge_ OJ
_CMT will cover_aJll<nownpro_ductiye hQrizons
CaSiog designs ad_equate for
C,T, B&permaJrost
CMT vol adßquate_ to tie-inlQng _string to_surf csg
_CMT vol adßquate_ to circ_ulate_oJlcond_uctor_
8. SUJfcs9
Y~s
NA
Y~s
No_
No
Y~s
Y~s
Yes
Y~s
NA
Y~s
Yes
Y~s
Yes
Y~s
No_
NA
iO ~ maturiog S8 devßlopment
Mud !¡hould preclude_H2_S_oRrig,
Rigis equipped withsßnsors_a_nd ~I~rms,
CalcuJatedMASP
1477 P!¡i.
PI~oned ßPPJest prßsswe3500 P5-i.
istaØequat~
PI~l)n_ed l11_ud wßigbUQ 9.3 ppg.
Surface ca$ing is_already set
Maximum BHP 8..6EMW.
304,056,approveø _2[25lO5
ßis ßquiPPßd with steeJ pits,
No Jesßrve pit pl<ll'!ned. .ð.11 wa_stelo Clas!¡
J
well{s).
Slotte_d lioercompletlon p1aol'!eø.
Surface ca_sing
Hr. 102
cel11entedtQ surface io origin_at well,
Engineering
.
Appr
SFD
3/31/2004
12
13
14
15
16
7
C_oocluctor
Surface
_casil)gpJQtects all known USDWs
string_PJQvidßd
ACMP Fil'!djng of
CQnsi$teocy_has bee_nJs_sued_ for_ this project
AJI wßlls_ within J [4_ mile _area_ of reyißw id~otified (For servjc_e w.ell only)
Pre-produced injßctor; ØuratioRof prß-proØuGtiol) leS5- than_ 3 mOl'!ths_ (For_sßrvice well QnJy)
Can permit
Well
15-day wait
IQcat~d withil) area <ll'!d_strataauthorized by_lojectioo Prd~r # (Put 10# jn_commeots)_
(For
Date
PTD#: 2040550
Administration
Well
Well
Well
_S_ufficiel'!t
Jfdßviatecl
_acrßage _ayailable
from otber wßlJs
in_dJilIiog unit
IQc~t~d proper _distance_
IQcat~d proper _distance
from driJling Ul'!itb_oUl'!dary_
_U_nique well n_al11~ _and oumb_er
IQcat~d
Company
P~rmit fee attacheØ
Leas~number
Field & Pool
2
3
4
5
6
7
8
9
10
11
be approved before
js weJlbQre platjl'!cluØecl
Operator Ol'!ly affected party _
_Opßrator has_appropriate_ bO!ld iJlJQrce
P~rmit cOJlservatiOI) order
P~rmit
BP EXPLORATION (ALASKA)
ina defil'!ed _pool
_appropriate
MILNE POINT, SCHRADER BLFF OIL
INC
can be issued witbQut
cao be issued witbQut
<ld mil) istratÌ\le _ approvaJ
525140
Initial ClasslType
_NA
Y~s
Y_es
Y~s
Y~s
y~s
Y~s
Yes
y~s
Yes
Y~s
Yes
Yes
NA
_NA
NA
NA
Conductor well.
,ð.I[ aquifer!¡ ex~mpled 40 cm
seUI'! origin_al
_(b)(3)
Multil<lteral Qf ßxisting welt driJled from exjstil'!g pad.
MPU E:2PAL 1
is al) NB producer. _nearby_ Qffsetwell MPU _C_-4 tL1 is_an_QA prod_ucer.
DEV
MPU SBPool, CO 4n governs
Well Name: MILNE PT UNIT SB E-20AL 1
PEND GeoArea _890
Multil<lteral
Surface
loca_tiol'! andJop_ prod_ iotß(V~1
il'! .ð.DL 25_51&; TDil'! .ð.DL 4743Z
Unit
11328
_ Program DEV
On/Off Shore
On
Well bore seg ~
Annular Disposal
e
e
Well History File
APPENDIX
Information of detailed nature that is not
particularly germane to the Well Permitting Process
but is part of the history file.
To improve the readability of the Well History file and to
simplify finding information, information of this
nature is accumulated at the end of the file under APPENDIX.
No special effort has been made to chronologically
organize this category of information.
Sperry-Sun Drtlting Services
LIS Scan Utility
e
$Revision: 3 $
LisLib $Revision: 4 $
Fri Jun 11 12:51:28 2004
)J-ç~\
Reel Header
Service name. ........... .LISTPE
Date. . . . . . . . . . . . . . . . . . . . .04/06/11
Origin. . . . . . . . . . . . . . . . . . . STS
Reel Name........ ....... .UNKNOWN
Continuation Number..... .01
Previous Reel Name...... . UNKNOWN
Comments................ .STS LIS Writing Library.
Scientific Technical Services
Tape Header
Service name............ .LISTPE
Date. . . . . . . . . . . . . . . . . . . . .04/06/11
Origin. . . . . . . . . . . . . . . . . . . STS
Tape Name............... . UNKNOWN
Continuation Number..... .01
Previous Tape Name...... . UNKNOWN
Comments................ .STS LIS Writing Library. Scientific Technical Services
Physical EOF
Comment Record
TAPE HEADER
Milne Point
MWD/MAD LOGS
#
WELL NAME:
API NUMBER:
OPERATOR:
LOGGING COMPANY:
TAPE CREATION DATE:
#
JOB DATA
MPE-20A Ll
500292256160
B.P. Exploration (Alaska) Inc.
Sperry-Sun Drilling Services
11-JUN-04
JOB NUMBER:
LOGGING ENGINEER:
OPERATOR WITNESS:
MWD RUN 1
MW0003034600
C.A. DEMOSKI
E. VAUGHN
MWD RUN 2
MW0003034600
C.A. DEMOSKI
E. VAUGHN
MWD RUN 4
MW0003034600
C.A. DEMOSKI
E. VAUGHN
JOB NUMBER:
LOGGING ENGINEER:
OPERATOR WITNESS:
MWD RUN 5
MW0003034600
C.A. DEMOSKI
E. VAUGHN
MWD RUN 6
MW0003034600
C.A. DEMOSKI
D. GREEN
#
SURFACE LOCATION
SECTION:
TOWNSHIP:
RANGE:
FNL:
FSL:
FEL:
FWL:
ELEVATION (FT FROM
KELLY BUSHING:
DERRICK FLOOR:
GROUND LEVEL:
25
13N
10E
3637
1955
MSL 0)
58.55
24.30
#
WELL CASING RECORD
OPEN HOLE
CASING
DRILLERS
).~vt -\).) ~
1ST STRING
2ND STRING
3RD STRING
PRODUCTION STRING
BIT silt
9.875
6.750
(IN) SIZE (IN) DEPTH (FT)
13.375 2457.0
7.625 5274.0
e
#
REMARKS:
1. ALL DEPTHS ARE MEASURED DEPTH (MD) UNLESS OTHERWISE
NOTED. THESE
DEPTHS ARE BIT DEPTHS.
2. ALL VERTICAL DEPTHS ARE TRUE VERTICAL DEPTH (TVD).
3. THIS WELL (AN OPENHOLE SIDETRACK) EXITS THE MPE-20A
L1 PB1 WELLBORE AT
5680'MD/4322'TVD, WITHIN THE MWD RUN 5 INTERVAL.
4. MWD RUN 1 COMPRISED DIRECTIONAL WITH DUAL GAMMA RAY
(DGR) UTILIZING
GEIGER-MUELLER TUBE DETECTORS. THE PURPOSE OF THIS
RUN WAS TO POSITION
THE WHIPSTOCK AND MILL THE WINDOW. THE TOP OF THE
WHIPSTOCK WAS AT
2457'MD AND THE BOTTOM WAS AT 2481'MD. UPHOLE TIE-IN
SGRC DATA WERE
ACQUIRED WHILE RIH FOR THIS RUN. MWD RUN 4 WAS
DIRECTIONAL-ONLY TO
POSITION THE WHIPSTOCK AND MILL THE WINDOW FOR THE
ABORTED MPE-20A L1
PB1 WELLBORE. THE TOP OF THE WHIPSTOCK WAS AT
5274'MD, WITHIN THE MWD
RUN 2 INTERVAL. ONLY SROP DATA ARE PRESENTED FOR RUN
4.
5. MWD RUNS 2, 5, AND 6 COMPRISED DIRECTIONAL WITH DGR
AND ELECTROMAGNETIC
WAVE RESISTIVITY PHASE-4 (EWR4). MWD RUNS 5 AND 6
ALSO INCLUDED PRESSURE
WHILE DRILLING (PWD) AND AT-BIT INCLINATION (ABI).
6. LOG AND DIGITAL DATA (LDWG) ONLY WERE BLOCK-SHIFTED
3' DOWNHOLE, PER
E-MAIL FROM K. COONEY (SIS/BP) DATED 3 JUNE 2004.
LOG HEADER DATA
RETAIN ORIGINAL DEPTH REFERENCES.
7. MWD RUNS 1, 2, 5, AND 6 REPRESENT WELL MPE-20A L1
WITH API#: 50-029-
22561-60. THIS WELL REACHED A TOTAL DEPTH (TD) OF
11078'MD/4247'TVD.
SROP SMOOTHED RATE OF PENETRATION WHILE DRILLING.
SGRC SMOOTHED GAMMA RAY COMBINED.
SEXP SMOOTHED PHASE SHIFT-DERIVED RESISTIVITY (EXTRA
SHALLOW SPACING) .
SESP = SMOOTHED PHASE SHIFT-DERIVED RESISTIVITY (SHALLOW
SPACING) .
SEMP = SMOOTHED PHASE SHIFT-DERIVED RESISTIVITY (MEDIUM
SPACING) .
SEDP = SMOOTHED PHASE SHIFT-DERIVED RESISTIVITY (DEEP
SPACING) .
SFXE = SMOOTHED FORMATION EXPOSURE TIME.
SLIDE = NON-ROTATED INTERVALS, REFLECTING BIT DEPTHS.
$
File Header
Service name........... ..STSLIB.001
Service Sub Level Name...
Version Number........ ..~0.0
Date of Generation... ....04/06/11
Maximum Physical Record..65535
File Type............... .LO
Previous File Name...... .STSLIB.OOO
e
Comment Record
FILE HEADER
FILE NUMBER:
EDITED MERGED MWD
Depth shifted
DEPTH INCREMENT:
#
FILE SUMMARY
PBU TOOL CODE
GR
ROP
FET
RPD
RPM
RPS
RPX
$
1
and clipped curveSj all bit runs merged.
.5000
START DEPTH
2395.5
2460.0
2467.5
2467.5
2467.5
2467.5
2467.5
STOP DEPTH
11025.0
11081.0
11032.0
11032.0
11032.0
11032.0
11032.0
#
BASELINE CURVE FOR SHIFTS:
CURVE SHIFT DATA (MEASURED DEPTH)
--------- EQUIVALENT UNSHIFTED DEPTH ------
BASELINE DEPTH GR
2395.5 2392.5
11081.0 11078.0
$
#
MERGED DATA SOURCE
PBU TOOL CODE BIT RUN NO MERGE TOP MERGE BASE
MWD 1 2392.5 2506.0
MWD 2 2506.0 5274.0
MWD 4 5274.0 5296.0
MWD 5 5296.0 5680.0
MWD 6 5680.0 11078.0
$
#
REMARKS: MERGED MAIN PASS.
$
#
Data Format Specification Record
Data Record Type..... ...... .... ...0
Data Specification Block Type... ..0
Logging Direction............... ..Down
Optical log depth units......... ..Feet
Data Reference Point............ ..Undefined
Frame Spacing................ ... ..60 .1IN
Max frames per record....... .... ..Undefined
Absent value.................... ..-999
Depth Units. . . . . . . . . . . . . . . . . . . . . . .
Datum Specification Block sub-type...O
Name Service Order Units Size Nsam Rep Code Offset Channel
DEPT FT 4 1 68 0 1
ROP MWD FT/H 4 1 68 4 2
GR MWD API 4 1 68 8 3
RPX MWD OHMM 4 1 68 12 4
RPS MWD OHMM 4 1 68 16 5
RPM MWD OHMM 4 1 68 20 6
RPD MWD OHMM 4 1 68 24 7
FET MWD HOUR 4 1 68 28 8
e 4Irst Last
Name Service Unit Min Max Mean Nsam Reading Reading
DEPT FT 2395.5 11081 6738.25 17372 2395.5 11081
ROP MWD FT/H 0.03 4961. 94 201.265 17243 2460 11081
GR MWD API 12.73 123.41 58.3101 17196 2395.5 11025
RPX MWD OHMM 1. 37 2000 34.0481 17130 2467.5 11032
RPS MWD OHMM 1. 37 2000 51.5481 17130 2467.5 11032
RPM MWD OHMM 1. 39 2000 85.5811 17130 2467.5 11032
RPD MWD OHMM 1. 43 2000 86.1007 17130 2467.5 11032
FET MWD HOUR 0.09 180.67 0.936905 17130 2467.5 11032
First Reading For Entire File...... ....2395.5
Last Reading For Entire File..... ..... .11081
File Trailer
Service name............ .STSLIB.001
Service Sub Level Name...
Version Number.......... .1.0.0
Date of Generation...... .04/06/11
Maximum Physical Record. .65535
File Type............... .LO
Next File Name.......... .STSLIB.002
Physical EOF
File Header
Service name..... ....... .STSLIB.002
Service Sub Level Name...
Version Number....... ....1.0.0
Date of Generation...... .04/06/11
Maximum Physical Record. .65535
File Type......... ...... .LO
Previous File Name... .., .STSLIB.001
Comment Record
FILE HEADER
FILE NUMBER:
RAW MWD
Curves and log
BIT RUN NUMBER:
DEPTH INCREMENT:
#
FILE SUMMARY
VENDOR TOOL CODE
GR
ROP
$
2
header data for each bit run in separate files.
1
.5000
START DEPTH
2392.5
2457.0
STOP DEPTH
2441.0
2506.0
#
LOG HEADER DATA
DATE LOGGED:
SOFTWARE
SURFACE SOFTWARE VERSION:
DOWNHOLE SOFTWARE VERSION:
DATA TYPE (MEMORY OR REAL-TIME) :
TD DRILLER (FT):
TOP LOG INTERVAL (FT):
BOTTOM LOG INTERVAL (FT):
BIT ROTATING SPEED (RPM):
HOLE INCLINATION (DEG
MINIMUM ANGLE:
MAXIMUM ANGLE:
23-APR-04
Insite
66.37
Memory
2506.0
2457.0
2506.0
12.9
12.9
#
TOOL STRING (TOP TO BOTTOM)
VENDOR TOOL CODE TOOL TYPE
TOOL NUMBER
DGR
$
DU.AMMA RAY
#
BOREHOLE AND CASING DATA
OPEN HOLE BIT SIZE (IN):
DRILLER'S CASING DEPTH (FT):
#
BOREHOLE CONDITIONS
MUD TYPE:
MUD DENSITY (LB/G):
MUD VISCOSITY (S):
MUD PH:
MUD CHLORIDES (PPM):
FLUID LOSS (C3):
RESISTIVITY (OHMM) AT TEMPERATURE (DEGF)
MUD AT MEASURED TEMPERATURE (MT):
MUD AT MAX CIRCULATING TERMPERATURE:
MUD FILTRATE AT MT:
MUD CAKE AT MT:
#
NEUTRON TOOL
MATRIX:
MATRIX DENSITY:
HOLE CORRECTION (IN):
#
TOOL STANDOFF (IN):
EWR FREQUENCY (HZ):
#
REMARKS:
$
#
Data Format Specification Record
Data Record Type....... ...........0
Data Specification Block Type... ..0
Logging Direction............... ..Down
Optical log depth units.......... .Feet
Data Reference Point............. . Undefined
Frame Spacing.................... .60 .1IN
Max frames per record............ . Undefined
Absent value........... .......... .-999
Depth Units. . . . . . . . . . . . . . . . . . . . . . .
Datum Specification Block sub-type...O
Name Service Order
DEPT
ROP MWD010
GR MWD010
Units
FT
FT/H
API
Size
4
4
4
Nsam Rep
1 68
1 68
1 68
Code
53519
e
12.250
.0
LSND
9.00
82.0
8.3
2850
5.0
.000
.000
.000
.000
.0
77.0
.0
.0
Offset
o
4
8
Channel
1
2
3
First Last
Name Service Unit Min Max Mean Nsam Reading Reading
DEPT FT 2392.5 2506 2449.25 228 2392.5 2506
ROP MWD010 FT/H 0.06 12.09 6.02939 99 2457 2506
GR MWD010 API 12.73 18.48 15.2604 98 2392.5 2441
First Reading For Entire File......... .2392.5
Last Reading For Entire File.......... .2506
File Trailer
Service name............ .STSLIB.002
Service Sub Level Name...
Version Number........ ...1.0.0
Date of Generation...... .04/06/11
Maximum Physical Record. .65535
File Type............... .LO
Next File Name........ ..4IÞSLIB.003
Physical EOF
File Header
Service name........... ..STSLIB.003
Service Sub Level Name...
Version Number.......... .1.0.0
Date of Generation...... .04/06/11
Maximum Physical Record. .65535
File Type...... . . . . . . . . . . LO
Previous File Name...... .STSLIB.002
Comment Record
FILE HEADER
FILE NUMBER:
RAW MWD
Curves and log
BIT RUN NUMBER:
DEPTH INCREMENT:
#
FILE SUMMARY
VENDOR TOOL CODE
RPD
RPM
RPS
RPX
FET
GR
ROP
$
3
e
header data for each bit run in separate files.
2
.5000
START DEPTH
2464.5
2464.5
2464.5
2464.5
2464.5
2473.5
2506.5
STOP DEPTH
5274.0
5274.0
5274.0
5274.0
5274.0
5274.0
5273.5
#
LOG HEADER DATA
DATE LOGGED:
SOFTWARE
SURFACE SOFTWARE VERSION:
DOWNHOLE SOFTWARE VERSION:
DATA TYPE (MEMORY OR REAL-TIME) :
TD DRILLER (FT):
TOP LOG INTERVAL (FT):
BOTTOM LOG INTERVAL (FT):
BIT ROTATING SPEED (RPM):
HOLE INCLINATION (DEG
MINIMUM ANGLE:
MAXIMUM ANGLE:
#
TOOL STRING (TOP TO
VENDOR TOOL CODE
DGR
EWR4
$
BOTTOM)
TOOL TYPE
DUAL GAMMA RAY
ELECTROMAG. RESIS. 4
#
BOREHOLE AND CASING DATA
OPEN HOLE BIT SIZE (IN):
DRILLER'S CASING DEPTH (FT):
#
BOREHOLE CONDITIONS
MUD TYPE:
MUD DENSITY (LB/G):
MUD VISCOSITY (S):
MUD PH:
MUD CHLORIDES (PPM):
FLUID LOSS (C3):
RESISTIVITY (OHMM) AT TEMPERATURE (DEGF)
MUD AT MEASURED TEMPERATURE (MT):
MUD AT MAX CIRCULATING TERMPERATURE:
25-APR-04
Insite
66.37
Memory
5274.0
2506.0
5274.0
12.7
87.0
TOOL NUMBER
120558
134760
9.875
2481. 0
LSND
9.30
59.0
9.0
3050
5.8
.700
.490
77.0
113.0
MUD FILTRATE AT MT4IÞ
MUD CAKE AT MT:
1.300
1. 450
.0
65.0
#
NEUTRON TOOL
MATRIX:
MATRIX DENSITY:
HOLE CORRECTION (IN):
#
TOOL STANDOFF (IN):
EWR FREQUENCY (HZ):
#
REMARKS:
$
#
Data Format Specification Record
Data Record Type..................O
Data Specification Block Type.....O
Logging Direction............... ..Down
Optical log depth units......... ..Feet
Data Reference Point............ ..Undefined
Frame Spacing................... ..60 .1IN
Max frames per record............ . Undefined
Absent value..................... .-999
Depth Units. . . . . . . . . . . . . . . . . . . . . . .
Datum Specification Block sub-type...O
Name Service Order Units Size Nsam Rep Code Offset Channel
DEPT FT 4 1 68 0 1
ROP MWD020 FT/H 4 1 68 4 2
GR MWD020 API 4 1 68 8 3
RPX MWD020 OHMM 4 1 68 12 4
RPS MWD020 OHMM 4 1 68 16 5
RPM MWD020 OHMM 4 1 68 20 6
RPD MWD020 OHMM 4 1 68 24 7
FET MWD020 HOUR 4 1 68 28 8
First Last
Name Service Unit Min Max Mean Nsam Reading Reading
DEPT FT 2464.5 5274 3869.25 5620 2464.5 5274
ROP MWD020 FT/H 1. 43 821.89 259.243 5535 2506.5 5273.5
GR MWD020 API 14.77 123.41 60.7983 5602 2473.5 5274
RPX MWD020 OHMM 1. 37 37.75 6.38457 5620 2464.5 5274
RPS MWD020 OHMM 1. 37 46.96 7.19134 5620 2464.5 5274
RPM MWD020 OHMM 1.39 67.84 7.48421 5620 2464.5 5274
RPD MWD020 OHMM 1.43 66.01 7.77778 5620 2464.5 5274
FET MWD020 HOUR 0.09 35.83 1.01299 5620 2464.5 5274
First Reading For Entire File...... ... .2464.5
Last Reading For Entire File....... ....5274
File Trailer
Service name............ .STSLIB.003
Service Sub Level Name...
Version Number.......... .1.0.0
Date of Generation...... .04/06/11
Maximum Physical Record. .65535
File Type............... .LO
Next File Name.......... .STSLIB.004
Physical EOF
File Header
service name........... .4ItSLIB.004
service Sub Level Name. . .
Version Number.......... .1.0.0
Date of Generation...... .04/06/11
Maximum Physical Record. .65535
File Type............... .LO
Previous File Name...... .STSLIB.003
Comment Record
FILE HEADER
FILE NUMBER:
RAW MWD
Curves and log
BIT RUN NUMBER:
DEPTH INCREMENT:
#
FILE SUMMARY
VENDOR TOOL CODE
SROP
$
4
e
header data for each bit run in separate files.
4
.5000
START DEPTH
5274.0
STOP DEPTH
5296.0
#
LOG HEADER DATA
DATE LOGGED:
SOFTWARE
SURFACE SOFTWARE VERSION:
DOWNHOLE SOFTWARE VERSION:
DATA TYPE (MEMORY OR REAL-TIME) :
TD DRILLER (FT):
TOP LOG INTERVAL (FT):
BOTTOM LOG INTERVAL (FT):
BIT ROTATING SPEED (RPM):
HOLE INCLINATION (DEG
MINIMUM ANGLE:
MAXIMUM ANGLE:
#
TOOL STRING (TOP TO BOTTOM)
VENDOR TOOL CODE TOOL TYPE
$
#
BOREHOLE AND CASING DATA
OPEN HOLE BIT SIZE (IN):
DRILLER'S CASING DEPTH (FT):
#
BOREHOLE CONDITIONS
MUD TYPE:
MUD DENSITY (LB/G):
MUD VISCOSITY (S):
MUD PH:
MUD CHLORIDES (PPM):
FLUID LOSS (C3):
RESISTIVITY (OHMM) AT TEMPERATURE (DEGF)
MUD AT MEASURED TEMPERATURE (MT):
MUD AT MAX CIRCULATING TERMPERATURE:
MUD FILTRATE AT MT:
MUD CAKE AT MT:
#
NEUTRON TOOL
MATRIX:
MATRIX DENSITY:
HOLE CORRECTION (IN):
#
TOOL STANDOFF (IN):
EWR FREQUENCY (HZ):
#
REMARKS:
$
#
Data Format Specification Record
01-MAY-04
Insite
Memory
5296.0
5274.0
5296.0
74.6
74.6
TOOL NUMBER
6.750
5274.0
oil Based
9.10
78.0
.0
34000
.0
.000
.000
.000
.000
.0
97.0
.0
.0
Data Record Type....... .4IÞ.......0
Data Specification Block Type.....O
Logging Direction. . . . . . . . . . . . . . . . . Down
Optical log depth units.......... .Feet
Data Reference Point............. . Undefined
Frame Spacing.................... .60 .1IN
Max frames per record............ . Undefined
Absent value..................... .-999
Depth Units. . . . . . . . . . . . . . . . . . . . . . .
Datum Specification Block sub-type...O
Name Service Order
DEPT
ROP MWD040
Name Service Unit
DEPT FT
ROP MWD040 FT/H
Units Size Nsam Rep Code Offset Channel
FT 4 1 68 0 1
FT/H 4 1 68 4 2
Min
5274
0.03
Max
5296
20.21
Mean
5285
8.63644
First Reading For Entire File......... .5274
Last Reading For Entire File.......... .5296
File Trailer
Service name............ .STSLIB.004
Service Sub Level Name...
Version Number.......... .1.0.0
Date of Generation...... .04/06/11
Maximum Physical Record. .65535
File Type............... .LO
Next File Name.......... .STSLIB.005
Physical EOF
File Header
Service name.... ........ .STSLIB.005
Service Sub Level Name...
Version Number......... ..1.0.0
Date of Generation...... ,04/06/11
Maximum Physical Record. .65535
File Type............... .LO
Previous File Name...... .STSLIB.004
Comment Record
FILE HEADER
FILE NUMBER:
RAW MWD
Curves and log
BIT RUN NUMBER:
DEPTH INCREMENT:
#
FILE SUMMARY
VENDOR TOOL CODE
GR
RPX
RPS
RPM
FET
RPD
ROP
$
5
Nsam
45
45
e
First
Reading
5274
5274
Last
Reading
5296
5296
header data for each bit run in separate files.
5
.5000
#
START DEPTH
5274.5
5274.5
5274.5
5274.5
5274.5
5274.5
5296.5
STOP DEPTH
5624.5
5631.0
5631.0
5631.0
5631.0
5631.0
5680.0
e
LOG HEADER DATA
DATE LOGGED:
SOFTWARE
SURFACE SOFTWARE VERSION:
DOWNHOLE SOFTWARE VERSION:
DATA TYPE (MEMORY OR REAL-TIME) :
TD DRILLER (FT):
TOP LOG INTERVAL (FT):
BOTTOM LOG INTERVAL (FT):
BIT ROTATING SPEED (RPM):
HOLE INCLINATION (DEG
MINIMUM ANGLE:
MAXIMUM ANGLE:
#
TOOL STRING (TOP TO
VENDOR TOOL CODE
DGR
EWR4
$
BOTTOM)
TOOL TYPE
DUAL GAMMA RAY
Electromag Resis. 4
#
BOREHOLE AND CASING DATA
OPEN HOLE BIT SIZE (IN):
DRILLER'S CASING DEPTH (FT):
#
BOREHOLE CONDITIONS
MUD TYPE:
MUD DENSITY (LB/G):
MUD VISCOSITY (S):
MUD PH:
MUD CHLORIDES (PPM):
FLUID LOSS (C3):
RESISTIVITY (OHMM) AT TEMPERATURE (DEGF)
MUD AT MEASURED TEMPERATURE (MT):
MUD AT MAX CIRCULATING TERMPERATURE:
MUD FILTRATE AT MT:
MUD CAKE AT MT:
#
NEUTRON TOOL
MATRIX:
MATRIX DENSITY:
HOLE CORRECTION (IN):
#
TOOL STANDOFF (IN):
EWR FREQUENCY (HZ):
#
REMARKS:
$
#
Data Format Specification Record
Data Record Type.............. ....0
Data Specification Block Type.....O
Logging Direction. . . . . . . . . . . . . . . . . Down
Optical log depth units.......... .Feet
Data Reference Point............. .Undefined
Frame Spacing................... ..60 .1IN
Max frames per record............ . Undefined
Absent value..................... .-999
Depth Units. . . . . . . . . . . . . . . . . . . . . . .
Datum Specification Block sub-type...O
e
02-MAY-04
Insite
66.37
Memory
5680.0
5296.0
5680.0
77.3
94.7
TOOL NUMBER
129046
162742
6.750
5274.0
Oil Based
9.30
77.0
.0
37000
.0
.000
.000
.000
.000
.0
100.4
.0
.0
Name Service Order Units Size Nsam Rep Code Offset Channel
DEPT FT 4 1 68 0 1
ROP MWD050 FT/H 4 1 68 4 2
GR MWD050 API 4 1 68 8 3
RPX MWD050 OHMM 4 1 68 12 4
RPS MWD050 OHMM 4 1 68 16 5
RPM MWD050 OHMM 4 1 68 20 6
RPD MWD050 OHMM 4 1 68 24 7
FET
MWD050
HOUR
--
1
68
28
8e
First Last
Name Service Unit Min Max Mean Nsam Reading Reading
DEPT FT 5274.5 5680 5477.25 812 5274.5 5680
ROP MWD050 FT/H 8.77 402.34 173.218 768 5296.5 5680
GR MWD050 API 24.88 101. 24 67.1692 701 5274.5 5624.5
RPX MWD050 OHMM 3.33 1508.06 20.5185 714 5274.5 5631
RPS MWD050 OHMM 4.3 1846.06 23.6079 714 5274.5 5631
RPM MWD050 OHMM 3.41 1756.61 30.9045 714 5274.5 5631
RPD MWD050 OHMM 2.75 588.9 21. 2155 714 5274.5 5631
FET MWD050 HOUR 0.33 180.67 3.38074 714 5274.5 5631
First Reading For Entire File......... .5274.5
Last Reading For Entire File.......... .5680
File Trailer
Service name.......... ...STSLIB.005
Service Sub Level Name...
Version Number.......... .1.0.0
Date of Generation...... .04/06/11
Maximum Physical Record. .65535
File Type....... ........ .LO
Next File Name.... ...... .STSLIB.006
Physical EOF
File Header
Service name............ .STSLIB.006
Service Sub Level Name...
Version Number.. ........ .1.0.0
Date of Generation...... .04/06/11
Maximum Physical Record. .65535
File Type............ ....LO
Previous File Name..... ..STSLIB.005
Comment Record
FILE HEADER
FILE NUMBER:
RAW MWD
Curves and log
BIT RUN NUMBER:
DEPTH INCREMENT:
#
FILE SUMMARY
VENDOR TOOL CODE
GR
RPD
RPM
RPS
RPX
FET
ROP
$
6
header data for each bit run in separate files.
6
.5000
START DEPTH
5625.0
5631.5
5631.5
5631.5
5631. 5
5631. 5
5680.5
STOP DEPTH
11022.0
11029.0
11029.0
11029.0
11029.0
11029.0
11078.0
#
LOG HEADER DATA
DATE LOGGED:
SOFTWARE
SURFACE SOFTWARE VERSION:
DOWNHOLE SOFTWARE VERSION:
DATA TYPE (MEMORY OR REAL-TIME) :
TD DRILLER (FT):
05-MAY-04
Insite
66.37
Memory
11078.0
..
TOP LOG INTERVAL (FT): 4IÞ
BOTTOM LOG INTERVAL (FT):
BIT ROTATING SPEED (RPM):
HOLE INCLINATION (DEG
MINIMUM ANGLE:
MAXIMUM ANGLE:
#
TOOL STRING (TOP TO
VENDOR TOOL CODE
DGR
EWR4
$
BOTTOM)
TOOL TYPE
DUAL GAMMA RAY
Electromag Resis. 4
#
BOREHOLE AND CASING DATA
OPEN HOLE BIT SIZE (IN):
DRILLER'S CASING DEPTH (FT):
#
BOREHOLE CONDITIONS
MUD TYPE:
MUD DENSITY (LB/G):
MUD VISCOSITY (S):
MUD PH:
MUD CHLORIDES (PPM):
FLUID LOSS (C3):
RESISTIVITY (OHMM) AT TEMPERATURE (DEGF)
MUD AT MEASURED TEMPERATURE (MT):
MUD AT MAX CIRCULATING TERMPERATURE:
MUD FILTRATE AT MT:
MUD CAKE AT MT:
#
NEUTRON TOOL
MATRIX:
MATRIX DENSITY:
HOLE CORRECTION (IN):
#
TOOL STANDOFF (IN):
EWR FREQUENCY (HZ):
#
REMARKS:
$
#
Data Format Specification Record
Data Record Type..................O
Data Specification Block Type.....O
Logging Direction................ . Down
Optical log depth units.......... .Feet
Data Reference Point............. . Undefined
Frame Spacing.................... .60 .1IN
Max frames per record.. .......... . Undefined
Absent value......... ... ......... .-999
Depth Units. . . . . . . . . . . . . . . . . . . . . . .
Datum Specification Block sub-type...O
5680.0
11078.0
74.6
96.4
TOOL NUMBER
129046
162742
6.750
5274.0
oil Based
9.30
78.0
.0
38500
.0
.000
.000
.000
.000
Name Service Order Units Size Nsam Rep Code Offset Channel
DEPT FT 4 1 68 0 1
ROP MWD060 FT/H 4 1 68 4 2
GR MWD060 API 4 1 68 8 3
RPX MWD060 OHMM 4 1 68 12 4
RPS MWD060 OHMM 4 1 68 16 5
RPM MWD060 OHMM 4 1 68 20 6
RPD MWD060 OHMM 4 1 68 24 7
FET MWD060 HOUR 4 1 68 28 8
Name Service Unit
DEPT FT
Min
5625
Max
11078
Mean Nsam
8351.5 10907
4IÞ
.0
120.2
.0
.0
First
Reading
5625
Last
Reading
11078
~ 0.6_ -5680.5
ROP MWD060 FT/H 4961.94 176.129 10796 11078
GR MWD060 API 20.5 105.59 56.8344 10795 5625 11022
RPX MWD060 OHMM 3.99 2000 49.3434 10796 5631.5 11029
RPS MWD060 OHMM 4.09 2000 76.4865 10796 5631.5 11029
RPM MWD060 OHMM 4.24 2000 129.852 10796 5631.5 11029
RPD MWD060 OHMM 4.56 2000 131.164 10796 5631.5 11029
FET MWD060 HOUR 0.2 7.33 0.735675 10796 5631.5 11029
First Reading For Entire File......... .5625
Last Reading For Entire File.......... .11078
File Trailer
Service name............ .STSLIB.006
Service Sub Level Name...
Version Number.......... .1.0.0
Date of Generation...... .04/06/11
Maximum Physical Record. .65535
File Type.............. ..LO
Next File Name.......... .STSLIB.007
Physical EOF
Tape Trailer
Service name....... ..... .LISTPE
Date. . . . . . . . . . . . . . . . . . . . .04/06/11
Origin. . . . . . . . . . . . . . . . . . . STS
Tape Name... ............ . UNKNOWN
Continuation Number..... .01
Next Tape Name...... .... .UNKNOWN
Comments..... ........... .STS LIS Writing Library. Scientific Technical Services
Reel Trailer
Service name............ .LISTPE
Date. . . . . . . . . . . . . . . . . . . . .04/06/11
Origin.................. .STS
Reel Name............... .UNKNOWN
Continuation Number.... ..01
Next Reel Name......... ..UNKNOWN
Comments................ .STS LIS Writing Library. Scientific Technical Services
Physical EOF
Physical EOF
End Of LIS File
Sperry-Sun Drilting Services
LIS Scan Utility
$Revision: 3 $
LisLib $Revision: 4 $
Fri Jun 11 13:50:45 2004
Reel Header
Service name............ .LISTPE
Date. . . . . . . . . . . . . . . . . . . . .04/06/11
Origin. . . . . . . . . . . . . . . . . . . STS
Reel Name............... . UNKNOWN
Continuation Number..... .01
Previous Reel Name...... . UNKNOWN
Comments........ ........ .STS LIS Writing Library.
Tape Header
Service name............ .LISTPE
Date. . . . . . . . . . . . . . . . . . . . .04/06/11
Origin. . . . . . . . . . . . . . . . . . . STS
Tape Name............... . UNKNOWN
Continuation Number..... .01
Previous Tape Name...... . UNKNOWN
Comments................ .STS LIS Writing Library.
Physical EOF
Comment Record
TAPE HEADER
Milne Point
MWD/MAD LOGS
#
WELL NAME:
API NUMBER:
OPERATOR:
LOGGING COMPANY:
TAPE CREATION DATE:
#
JOB DATA
e
/" tt
,~ }
Scientific Technical Services
Scientific Technical Services
MPE-20A L1PB1
500292256170
B.P. Exploration (Alaska) Inc.
Sperry-Sun Drilling Services
11-JUN-04
JOB NUMBER:
LOGGING ENGINEER:
OPERATOR WITNESS:
MWD RUN 1
MW0003034600
C.A. DEMOSKI
E. VAUGHN
MWD RUN 2
MW0003034600
C.A. DEMOSKI
E. VAUGHN
JOB NUMBER:
LOGGING ENGINEER:
OPERATOR WITNESS:
MWD RUN 5
MW0003034600
C.A. DEMOSKI
E. VAUGHN
#
SURFACE LOCATION
SECTION:
TOWNSHIP:
RANGE:
FNL:
FSL:
FEL:
FWL:
ELEVATION (FT FROM MSL 0)
KELLY BUSHING:
DERRICK FLOOR:
GROUND LEVEL:
25
13N
10E
3637
1955
58.55
24.30
#
WELL CASING RECORD
OPEN HOLE
CASING
DRILLERS
MWD RUN 4
MW0003034600
C.A. DEMOSKI
E. VAUGHN
~~vt-C)S->
1ST STRING
2ND STRING
3RD STRING
PRODUCTION STRING
BIT silt
9.875
6.750
(IN) SIZE (IN) DEPTH (FT)
13.375 2457.0
7.625 5274.0
e
#
REMARKS:
1. ALL DEPTHS ARE MEASURED DEPTH (MD) UNLESS OTHERWISE
NOTED. THESE
DEPTHS ARE BIT DEPTHS.
2. ALL VERTICAL DEPTHS ARE TRUE VERTICAL DEPTH (TVD).
3. THIS WELL EXITS THE MPE-20A WELLBORE AT
5274'MD/4283'TVD, WITHIN THE
MWD RUN 2 INTERVAL.
4. MWD RUN 1 COMPRISED DIRECTIONAL WITH DUAL GAMMA RAY
(DGR) UTILIZING
GEIGER-MUELLER TUBE DETECTORS. THE PURPOSE OF THIS
RUN WAS TO POSITION
THE WHIPSTOCK AND MILL THE WINDOW. THE TOP OF THE
WHIPSTOCK WAS AT
2457'MD AND THE BOTTOM WAS AT 2481'MD. UPHOLE TIE-IN
SGRC DATA WERE
ACQUIRED WHILE RIH FOR THIS RUN. MWD RUN 4 WAS
DIRECTIONAL-ONLY TO
POSITION THE WHIPSTOCK AND MILL THE WINDOW. THE TOP
OF THE WHIPSTOCK
WAS AT 5274'MD. ONLY SROP DATA ARE PRESENTED FOR RUN
4.
5. MWD RUNS 2 AND 5 COMPRISED DIRECTIONAL WITH DGR AND
ELECTROMAGNETIC
WAVE RESISTIVITY PHASE-4 (EWR4). MWD RUN 5 ALSO
INCLUDED PRESSURE
WHILE DRILLING (PWD) AND AT-BIT INCLINATION (ABI).
6. LOG AND DIGITAL DATA (LDWG) ONLY WERE BLOCK-SHIFTED
3' DOWNHOLE, PER
E-MAIL FROM K. COONEY (SIS/BP) DATED 3 JUNE 2004.
LOG HEADER DATA
RETAIN ORIGINAL DEPTH REFERENCES.
7. MWD RUNS 1, 2, AND 5 REPRESENT WELL MPE-20A L1 PB1
WITH API#: 50-029-
22561-70. THIS WELL REACHED A TOTAL DEPTH (TD) OF
6067'MD/4294'TVD.
SROP SMOOTHED RATE OF PENETRATION WHILE DRILLING.
SGRC SMOOTHED GAMMA RAY COMBINED.
SEXP SMOOTHED PHASE SHIFT-DERIVED RESISTIVITY (EXTRA
SHALLOW SPACING) .
SESP = SMOOTHED PHASE SHIFT-DERIVED RESISTIVITY (SHALLOW
SPACING) .
SEMP = SMOOTHED PHASE SHIFT-DERIVED RESISTIVITY (MEDIUM
SPACING) .
SEDP = SMOOTHED PHASE SHIFT-DERIVED RESISTIVITY (DEEP
SPACING) .
SFXE = SMOOTHED FORMATION EXPOSURE TIME.
SLIDE = NON-ROTATED INTERVALS, REFLECTING BIT DEPTHS.
$
File Header
Service name........... ..STSLIB.001
Service Sub Level Name...
Version Number......... ..1.0.0
Date of Generation..... ..04/06/11
Maximum Physical Record.4It535
File Type.. .... ......... .LO
Previous File Name...... .STSLIB.OOO
e
Comment Record
FILE HEADER
FILE NUMBER:
EDITED MERGED MWD
Depth shifted
DEPTH INCREMENT:
#
FILE SUMMARY
PBU TOOL CODE
GR
ROP
FET
RPD
RPM
RPS
RPX
$
1
and clipped curveSj all bit runs merged.
.5000
START DEPTH
2395.5
2460.0
2467.5
2467.5
2467.5
2467.5
2467.5
STOP DEPTH
6014.5
6070.5
5694.5
6021. 5
6021. 5
6021. 5
6021.5
#
BASELINE CURVE FOR SHIFTS:
CURVE SHIFT DATA (MEASURED DEPTH)
--------- EQUIVALENT UNSHIFTED DEPTH ---------
BASELINE DEPTH
2395.5
6070.5
$
#
MERGED DATA SOURCE
PBU TOOL CODE
MWD
MWD
MWD
MWD
$
#
REMARKS:
GR
2392.5
6067.5
BIT RUN NO
1
2
4
5
MERGED MAIN PASS.
$
MERGE TOP
2392.5
2506.0
5274.0
5296.0
MERGE BASE
2506.0
5274.0
5296.0
6067.5
#
Data Format Specification Record
Data Record Type..................O
Data Specification Block Type.....O
Logging Direction.. .............. . Down
Optical log depth units.......... .Feet
Data Reference Point............ ..Undefined
Frame Spacing.................. ...60 .1IN
Max frames per record........... ..Undefined
Absent value..................... .-999
Depth units. . . . . . . . . . . . . . . . . . . . . . .
Datum Specification Block sub-type...O
Name Service Order Units Size Nsam Rep Code Offset Channel
DEPT FT 4 1 68 0 1
ROP MWD FT/H 4 1 68 4 2
GR MWD API 4 1 68 8 3
RPX MWD OHMM 4 1 68 12 4
RPS MWD OHMM 4 1 68 16 5
RPM MWD OHMM 4 1 68 20 6
RPD MWD OHMM 4 1 68 24 7
FET MWD HOUR 4 1 68 28 8
Name Service Unit
DEPT FT
Min
2395.5
Max
6070.5
Mean Nsam
4233 7351
First
Reading
2395.5
Last
Reading
6070.5
ROP MWD FT/H 0.0_ 821. 89 239.221 7222 e 2460 6070.5
GR MWD API 12.73 123.41 62.4358 7175 2395.5 6014.5
RPX MWD OHMM 1. 37 1508.06 7.87658 7109 2467.5 6021.5
RPS MWD OHMM 1. 37 1846.06 8.85775 7109 2467.5 6021.5
RPM MWD OHMM 1. 39 1756.61 9.86292 7109 2467.5 6021. 5
RPD MWD OHMM 1.43 588.9 9.15773 7109 2467.5 6021. 5
FET MWD HOUR 0.09 180.67 1.2709 6455 2467.5 5694.5
First Reading For Entire File......... .2395.5
Last Reading For Entire File....... ... .6070.5
File Trailer
Service name.... ........ .STSLIB.001
service Sub Level Name...
Version Number.......... .1.0.0
Date of Generation.. ... ..04/06/11
Maximum Physical Record. .65535
File Type.. ............. .LO
Next File Name.......... .STSLIB.002
Physical EOF
File Header
Service name............ .STSLIB.002
Service Sub Level Name...
Version Number.... ...... .1.0.0
Date of Generation. .... ..04/06/11
Maximum Physical Record..65535
File Type............... .LO
Previous File Name...... .STSLIB.001
Comment Record
FILE HEADER
FILE NUMBER:
RAW MWD
Curves and log
BIT RUN NUMBER:
DEPTH INCREMENT:
#
FILE SUMMARY
VENDOR TOOL CODE
GR
ROP
$
2
header data for each bit run in separate files.
1
.5000
START DEPTH
2392.5
2457.0
STOP DEPTH
2441.0
2506.0
#
LOG HEADER DATA
DATE LOGGED:
SOFTWARE
SURFACE SOFTWARE VERSION:
DOWNHOLE SOFTWARE VERSION:
DATA TYPE (MEMORY OR REAL-TIME) :
TD DRILLER (FT):
TOP LOG INTERVAL (FT):
BOTTOM LOG INTERVAL (FT):
BIT ROTATING SPEED (RPM):
HOLE INCLINATION (DEG
MINIMUM ANGLE:
MAXIMUM ANGLE:
23-APR-04
Insite
66.37
Memory
2506.0
2457.0
2506.0
12.9
12.9
#
TOOL STRING (TOP TO
VENDOR TOOL CODE
DGR
$
BOTTOM)
TOOL TYPE
DUAL GAMMA RAY
TOOL NUMBER
53519
#
BOREHOLE AND
OPEN HOLE
DRILLER'S
CASING DATAe
BIT SIZE (IN):
CASING DEPTH (FT):
#
BOREHOLE CONDITIONS
MUD TYPE:
MUD DENSITY (LB/G):
MUD VISCOSITY (S):
MUD PH:
MUD CHLORIDES (PPM):
FLUID LOSS (C3):
RESISTIVITY (OHMM) AT TEMPERATURE (DEGF)
MUD AT MEASURED TEMPERATURE (MT):
MUD AT MAX CIRCULATING TERMPERATURE:
MUD FILTRATE AT MT:
MUD CAKE AT MT:
#
NEUTRON TOOL
MATRIX:
MATRIX DENSITY:
HOLE CORRECTION (IN):
#
TOOL STANDOFF (IN):
EWR FREQUENCY (HZ):
#
REMARKS:
$
#
Data Format Specification Record
Data Record Type................ ..0
Data Specification Block Type... ..0
Logging Direction............... ..Down
Optical log depth units.......... .Feet
Data Reference Point... .......... . Undefined
Frame Spacing............ ........ .60 .1IN
Max frames per record........... ..Undefined
Absent value... ................. ..-999
Depth Units. . . . . . . . . . . . . . . . . . . . . . .
Datum Specification Block sub-type...O
Name Service Order
DEPT
ROP MWD010
GR MWD010
Units
FT
FT/H
API
Size
4
4
4
Nsam Rep
1 68
1 68
1 68
Code
e
11.625
2457.0
LSND
9.00
82.0
8.3
2850
5.0
.000 .0
.000 77.0
.000 .0
.000 .0
Offset
o
4
8
Channel
1
2
3
First Last
Name Service Unit Min Max Mean Nsam Reading Reading
DEPT FT 2392.5 2506 2449.25 228 2392.5 2506
ROP MWD010 FT/H 0.06 12.09 6.02939 99 2457 2506
GR MWD010 API 12.73 18.48 15.2604 98 2392.5 2441
First Reading For Entire File......... .2392.5
Last Reading For Entire File.......... .2506
File Trailer
Service name............ .STSLIB.002
Service Sub Level Name...
Version Number......... ..1.0.0
Date of Generation...... .04/06/11
Maximum Physical Record. .65535
File Type....... ........ .LO
Next File Name.......... .STSLIB.003
e
Physical EOF
File Header
Service name......... ... .STSLIB.003
Service Sub Level Name...
Version Number.......... .1.0.0
Date of Generation...... .04/06/11
Maximum Physical Record. .65535
File Type.... ........... .LO
Previous File Name...... .STSLIB.002
Comment Record
FILE HEADER
FILE NUMBER:
RAW MWD
Curves and log
BIT RUN NUMBER:
DEPTH INCREMENT:
#
FILE SUMMARY
VENDOR TOOL CODE
FET
RPD
RPM
RPX
RPS
GR
ROP
$
3
e
header data for each bit run in separate files.
2
.5000
START DEPTH
2464.5
2464.5
2464.5
2464.5
2464.5
2473.5
2506.5
STOP DEPTH
5274.0
5274.0
5274.0
5274.0
5274.0
5274.0
5273.5
#
LOG HEADER DATA
DATE LOGGED:
SOFTWARE
SURFACE SOFTWARE VERSION:
DOWNHOLE SOFTWARE VERSION:
DATA TYPE (MEMORY OR REAL-TIME) :
TD DRILLER (FT):
TOP LOG INTERVAL (FT):
BOTTOM LOG INTERVAL (FT):
BIT ROTATING SPEED (RPM):
HOLE INCLINATION (DEG
MINIMUM ANGLE:
MAXIMUM ANGLE:
#
TOOL STRING (TOP TO
VENDOR TOOL CODE
DGR
EWR4
$
BOTTOM)
TOOL TYPE
DUAL GAMMA RAY
ELECTROMAG. RESIS. 4
#
BOREHOLE AND CASING DATA
OPEN HOLE BIT SIZE (IN):
DRILLER'S CASING DEPTH (FT):
#
BOREHOLE CONDITIONS
MUD TYPE:
MUD DENSITY (LB/G):
MUD VISCOSITY (S):
MUD PH:
MUD CHLORIDES (PPM):
FLUID LOSS (C3):
RESISTIVITY (OHMM) AT TEMPERATURE (DEGF)
MUD AT MEASURED TEMPERATURE (MT):
MUD AT MAX CIRCULATING TERMPERATURE:
MUD FILTRATE AT MT:
MUD CAKE AT MT:
#
25-APR-04
Insite
66.37
Memory
5274.0
2506.0
5274.0
12.7
87.0
TOOL NUMBER
120558
134760
9.875
2481.0
LSND
9.30
59.0
9.0
3050
5.8
.700
.490
1. 300
1. 450
77.0
113.0
70.0
65.0
NEUTRON TOOL
MATRIX:
MATRIX DENSITY:
HOLE CORRECTION
e
e
(IN) :
#
TOOL STANDOFF (IN):
EWR FREQUENCY (HZ):
#
REMARKS:
$
#
Data Format Specification Record
Data Record Type..................O
Data Specification Block Type.....O
Logging Direction............... ..Down
Optical log depth units......... ..Feet
Data Reference Point.......... ....Undefined
Frame Spacing... ................ ..60 .1IN
Max frames per record........... ..Undefined
Absent value..................... .-999
Depth Units. . . . . . . . . . . . . . . . . . . . . . .
Datum Specification Block sub-type...O
Name Service Order Units Size Nsam Rep Code Offset Channel
DEPT FT 4 1 68 0 1
ROP MWD020 FT/H 4 1 68 4 2
GR MWD020 API 4 1 68 8 3
RPX MWD020 OHMM 4 1 68 12 4
RPS MWD020 OHMM 4 1 68 16 5
RPM MWD020 OHMM 4 1 68 20 6
RPD MWD020 OHMM 4 1 68 24 7
FET MWD020 HOUR 4 1 68 28 8
First Last
Name Service Unit Min Max Mean Nsam Reading Reading
DEPT FT 2464.5 5274 3869.25 5620 2464.5 5274
ROP MWD020 FT/H 1. 43 821. 89 259.243 5535 2506.5 5273.5
GR MWD020 API 14.77 123.41 60.7983 5602 2473.5 5274
RPX MWD020 OHMM 1. 37 37.75 6.38457 5620 2464.5 5274
RPS MWD020 OHMM 1. 37 46.96 7.19134 5620 2464.5 5274
RPM MWD020 OHMM 1.39 67.84 7.48421 5620 2464.5 5274
RPD MWD020 OHMM 1.43 66.01 7.77778 5620 2464.5 5274
FET MWD020 HOUR 0.09 35.83 1.01299 5620 2464.5 5274
First Reading For Entire File..... .... .2464.5
Last Reading For Entire File.......... .5274
File Trailer
Service name....... .... ..STSLIB.003
Service Sub Level Name...
Version Number....... ....1.0.0
Date of Generation...... .04/06/11
Maximum Physical Record. .65535
File Type........ . . . . . . . .LO
Next File Name.......... .STSLIB.004
Physical EOF
File Header
Service name... ......... .STSLIB.004
Service Sub Level Name...
Version Number.......... .1.0.0
Date of Generation..... .~/06/11
Maximum Physical Record. .65535
File Type.......... . . . . . .LO
Previous File Name...... .STSLIB.003
Comment Record
FILE HEADER
FILE NUMBER:
RAW MWD
Curves and log
BIT RUN NUMBER:
DEPTH INCREMENT:
#
FILE SUMMARY
VENDOR TOOL CODE
ROP
$
4
e
header data for each bit run in separate files.
4
.5000
START DEPTH
5274.0
STOP DEPTH
5296.0
#
LOG HEADER DATA
DATE LOGGED:
SOFTWARE
SURFACE SOFTWARE VERSION:
DOWNHOLE SOFTWARE VERSION:
DATA TYPE (MEMORY OR REAL-TIME) :
TD DRILLER (FT):
TOP LOG INTERVAL (FT):
BOTTOM LOG INTERVAL (FT):
BIT ROTATING SPEED (RPM):
HOLE INCLINATION (DEG
MINIMUM ANGLE:
MAXIMUM ANGLE:
#
TOOL STRING (TOP TO BOTTOM)
VENDOR TOOL CODE TOOL TYPE
$
#
BOREHOLE AND CASING DATA
OPEN HOLE BIT SIZE (IN):
DRILLER'S CASING DEPTH (FT):
#
BOREHOLE CONDITIONS
MUD TYPE:
MUD DENSITY (LB/G):
MUD VISCOSITY (S):
MUD PH:
MUD CHLORIDES (PPM):
FLUID LOSS (C3):
RESISTIVITY (OHMM) AT TEMPERATURE (DEGF)
MUD AT MEASURED TEMPERATURE (MT):
MUD AT MAX CIRCULATING TERMPERATURE:
MUD FILTRATE AT MT:
MUD CAKE AT MT:
#
NEUTRON TOOL
MATRIX:
MATRIX DENSITY:
HOLE CORRECTION (IN):
#
TOOL STANDOFF (IN):
EWR FREQUENCY (HZ):
#
REMARKS:
$
#
Data Format Specification Record
Data Record Type.............. ....0
Data Specification Block Type.....O
Logging Direction................ . Down
01-MAY-04
Insite
o
Memory
5296.0
5274.0
5296.0
74.6
74.6
TOOL NUMBER
6.151
5274.0
Oil Based
9.10
78.0
.0
34000
.0
.000
.000
.000
.000
.0
97.0
.0
.0
Optical log depth units.4IÞ...... .Feet
Data Reference Point..... ........ .Undefined
Frame Spacing............ ........ .60 .1IN
Max frames per record.... ........ .Undefined
Absent value........... .......... .-999
Depth Uni ts . . . . . . . . . . . . . . . . . . . . . . .
Datum Specification Block sub-type...O
Name Service Order
DEPT
ROP MWD040
Name Service Unit
DEPT FT
ROP MWD040 FT/H
Units Size Nsam Rep Code Offset Channel
FT 4 1 68 0 1
FT/H 4 1 68 4 2
Min
5274
0.03
Max
5296
20.21
Mean
5285
8.63644
First Reading For Entire File......... .5274
Last Reading For Entire File....... ... .5296
File Trailer
Service name... ......... .STSLIB.004
Service Sub Level Name...
Version Number.. ........ .1.0.0
Date of Generation...... .04/06/11
Maximum Physical Record..65535
File Type............... .LO
Next File Name.......... .STSLIB.005
Physical EOF
File Header
Service name............ .STSLIB.005
Service Sub Level Name...
Version Number.......... .1.0.0
Date of Generation. .... ..04/06/11
Maximum Physical Record..65535
File Type........... .....LO
Previous File Name...... .STSLIB.004
Comment Record
FILE HEADER
FILE NUMBER:
RAW MWD
Curves and log
BIT RUN NUMBER:
DEPTH INCREMENT:
#
FILE SUMMARY
VENDOR TOOL CODE
RPD
RPM
RPS
RPX
GR
FET
ROP
$
5
Nsam
45
45
e
First
Reading
5274
5274
Last
Reading
5296
5296
header data for each bit run in separate files.
5
.5000
#
LOG HEADER DATA
DATE LOGGED:
SOFTWARE
START DEPTH
5274.5
5274.5
5274.5
5274.5
5274.5
5274.5
5296.5
STOP DEPTH
6018.5
6018.5
6018.5
6018.5
6011.5
5691. 5
6067.5
02-MAY-04
SURFACE SOFTWARE VERStIt:
DOWNHOLE SOFTWARE VERSION:
DATA TYPE (MEMORY OR REAL-TIME) :
TD DRILLER (FT):
TOP LOG INTERVAL (FT):
BOTTOM LOG INTERVAL (FT):
BIT ROTATING SPEED (RPM):
HOLE INCLINATION (DEG
MINIMUM ANGLE:
MAXIMUM ANGLE:
#
TOOL STRING (TOP TO
VENDOR TOOL CODE
DGR
EWR4
$
BOTTOM)
TOOL TYPE
DUAL GAMMA RAY
Electromag Resis. 4
#
BOREHOLE AND CASING DATA
OPEN HOLE BIT SIZE (IN):
DRILLER'S CASING DEPTH (FT):
#
BOREHOLE CONDITIONS
MUD TYPE:
MUD DENSITY (LB/G):
MUD VISCOSITY (S):
MUD PH:
MUD CHLORIDES (PPM):
FLUID LOSS (C3):
RESISTIVITY (OHMM) AT TEMPERATURE (DEGF)
MUD AT MEASURED TEMPERATURE (MT):
MUD AT MAX CIRCULATING TERMPERATURE:
MUD FILTRATE AT MT:
MUD CAKE AT MT:
#
NEUTRON TOOL
MATRIX:
MATRIX DENSITY:
HOLE CORRECTION (IN):
#
TOOL STANDOFF (IN):
EWR FREQUENCY (HZ):
#
REMARKS:
$
#
Data Format Specification Record
Data Record Type..... .... .........0
Data Specification Block Type... ..0
Logging Direction.............. ...Down
Optical log depth units.......... .Feet
Data Reference Point............. . Undefined
Frame Spacing....... ............. .60 .1IN
Max frames per record. .... ...... ..Undefined
Absent value.................... ..-999
Depth Units. . . . . . . . . . . . . . . . . . . . . . .
Datum Specification Block sub-type...O
Insite
66.37
Memory
6067.0
5296 . 0
6067.0
e
77.3
94.7
TOOL NUMBER
129046
162742
6.750
5274.0
oil Based
9.30
77.0
.0
37000
.0
.000
.000
.000
.000
.0
100.4
.0
.0
Name Service Order Units Size Nsam Rep Code Offset Channel
DEPT FT 4 1 68 0 1
ROP MWD050 FT/H 4 1 68 4 2
GR MWD050 API 4 1 68 8 3
RPX MWD050 OHMM 4 1 68 12 4
RPS MWD050 OHMM 4 1 68 16 5
RPM MWD050 OHMM 4 1 68 20 6
RPD MWD050 OHMM 4 1 68 24 7
FET MWD050 HOUR 4 1 68 28 8
e e
First Last
Name Service Unit Min Max Mean Nsam Reading Reading
DEPT FT 5274.5 6067.5 5671 1587 5274.5 6067.5
ROP MWD050 FT/H 8.77 402.34 189.085 1543 5296.5 6067.5
GR MWD050 API 24.88 107.53 71.7894 1475 5274.5 6011.5
RPX MWD050 OHMM 3.33 1508.06 13.5079 1489 5274.5 6018.5
RPS MWD050 OHMM 4.3 1846.06 15.1473 1489 5274.5 6018.5
RPM MWD050 OHMM 3.41 1756.61 18.841 1489 5274.5 6018.5
RPD MWD050 OHMM 2.75 588.9 14.3662 1489 5274.5 6018.5
FET MWD050 HOUR 0.33 180.67 3.00681 835 5274.5 5691.5
First Reading For Entire File......... .5274.5
Last Reading For Entire File.......... .6067.5
File Trailer
Service name............ .STSLIB.005
Service Sub Level Name...
Version Number.......... .1.0.0
Date of Generation...... .04/06/11
Maximum Physical Record. .65535
File Type.... ........... .LO
Next File Name. ......... .STSLIB.006
Physical EOF
Tape Trailer
Service name............ .LISTPE
Date. . . . . . . . . . . . . . . . . . . . .04/06/11
Origin. . . . . . . . . . . . . . . . . . . STS
Tape Name.... ........... . UNKNOWN
Continuation Number..... .01
Next Tape Name.......... . UNKNOWN
Comments.......... ...... .STS LIS Writing Library. Scientific Technical Services
Reel Trailer
Service name. ........... .LISTPE
Date.................... .04/06/11
Origin. . . . . . . . . . . . . . . . . . . STS
Reel Name............... .UNKNOWN
Continuation Number.. ....01
Next Reel Name......... ..UNKNOWN
Comments.... ............ .STS LIS Writing Library. Scientific Technical Services
Physical EOF
Physical EOF
End Of LIS File