Department of Commerce, Community, and Economic Development
Alaska Oil and Gas Conservation
Commission
HOME
EVENTS
DATA
Data List
Drilling
Production
Orders
Data Miner
Document Search
REPORTS
Reports and Charts
Pool Statistics
FORMS
LINKS
Links
Test Notification
Data Requests
Regulations
Industry Guidance Bulletins
How to Apply
ABOUT US
History
Staff
HELP
Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
196-166
• • 14 RECEIVED Post Office Box 244027 y Anchorage,AK 99524-4027 Hilcorp Alaska,LLC JUL 3 0 20h 3800 Centerpoint Drive Suite 100 AOGCCAnchorage,AK 99503 Phone: 907/777-8300 Fax: 907/777.-8301 July 29, 2015 Commissioner Cathy Foerster Alaska Oil & Gas Conservation Commission f to 333 West 7th Avenue, Suite 100 Anchorage, AK 99501 Re: Duck Island Unit Well Renaming Request E,P 0/ olol6 NEP Dear Commissioner Foerster, Hilcorp Alaska, LLC (HAK) requests a change to the naming convention of Duck Island Unit wells to remove the unused suffixes at the end of each well name. Well names currently include a forward slash "/" followed by an obsolete bottom hole location designator. HAK would like to retain the well number as well as the "A, B, C...." sidetrack designations but remove the "/suffix". For example, "DUCK IS UNIT SDI 1-09A/L21" would become "DUCK IS UNIT SDI 1-09A". The attached spreadsheet includes original and new names for all Duck Island wells. While performing the review of Duck Island well names, HAK found a single well, "DUCK IS UNIT SDI 4-20/M35" (PTD# 1861730), that should also be modified to include an "A" label to reflect the fact that the well is a sidetrack from the original "DUCK IS UNIT SDI 4-20/134" (PTD # 1861500). The original wellbore, abandoned 10/13/1986, was sidetracked to a new bottom hole location completed on 9/9/1987. This well appears to be one of the first sidetracks performed at Endicott. While the bottom hole code was changed, no letter was added to reflect the sidetrack. "DUCK IS UNIT SDI 4-20A" is also included on the attached spreadsheet. Sincerely, Wyatt Rivard Well Integrity Engineer Hilcorp Alaska, LLC CC Dave Roby Victoria Loepp Orig • New API_WellNo I PermitNumberl WellName I WellNumber I WeIlNumber 50029219460600 2032160 DUCK IS UNIT SDI 3-17F/K30 3-17F 50029224630000 1940490 DUCK IS UNIT SDI 3-19/R28 3-19 50029217140000 1870330 DUCK IS UNIT SDI 3-21/L34 3-21 50029217149500 1980190 DUCK IS UNIT SDI 3-21AK35XX 3-21AXX 50029216450000 1861550 DUCK IS UNIT SDI 3-23/N32 3-23 50029221250000 1901820 DUCK IS UNIT SDI 3-25/M27 3-25 50029221250100 2010200 DUCK IS UNIT SDI 3-25A/N24 3-25A 50029221250200 2030210 DUCK IS UNIT SDI 3-25B/L27 3-25B 50029215860000 1860830 DUCK IS UNIT SDI 3-27/M33 3-27 50029221060000 1901560 DUCK IS UNIT SDI 3-29/J32 3-29 50029228380000 1972270 DUCK IS UNIT SDI 3-31/K32 3-31 50029216680000 1861800 DUCK IS UNIT SDI 3-33/K37 3-33 50029216680100 2032150 DUCK IS UNIT SDI 3-33A/J35 3-33A 50029217010000 1870200 DUCK IS UNIT SDI 3-35/L36 3-35 50029225540000 1950510 DUCK IS UNIT SDI 3-37/L35 3-37 50029217640000 1871160 DUCK IS UNIT SDI 3-39/J39 3-39 50029217640100 1970910 DUCK IS UNIT SDI 3-39A/I37 3-39A 50029218780000 1881260 DUCK IS UNIT SDI 3-41/K39 3-41 50029224160000 1931700 DUCK IS UNIT SDI 3-43/P36 3-43 50029218110000 1880510 DUCK IS UNIT SDI 3-45/M39 3-45 50029215690000 1860640 DUCK IS UNIT SDI 3-47/Q35 3-47 50029217350000 1870600 DUCK IS UNIT SDI 3-49/J40 3-49 50029217350200 1970570 DUCK IS UNIT SDI 3-49A/M40 3-49A 50029217359500 1950350 DUCK IS UNIT SDI 3-49AJ40XX 3-49AXX 50029217890000 1880220 DUCK IS UNIT SDI 4-02/Q28 4-02 50029219680000 1890860 DUCK IS UNIT SDI 4-04/T26 4-04 50029219680100 2090190 DUCK IS UNIT SDI 4-04A/T30 4-04A 50029217230000 1870430 DUCK IS UNIT SDI 4-06/Q32 4-06 50029217230100 1961660 DUCK IS UNIT SDI 4-06A/Q30 4-06A 50029216920000 1870080 DUCK IS UNIT SDI 4-08/P27 4-08 50029224640000 1940500 DUCK IS UNIT SDI 4-10/M28 4-10 50029224640100 2022380 DUCK IS UNIT SDI 4-10A/L28 4-10A 50029218630000 1881040 DUCK IS UNIT SDI 4-14/R34 4-14 50029218630100 2080120 DUCK IS UNIT SDI 4-14A/S-37 4-14A 50029218960000 1881490 DUCK IS UNIT SDI 4-18/S30 4-18 50029216400100 1861730 DUCK IS UNIT SDI 4-20/M35 4-20A 50029216400000 1861500 DUCK IS UNIT SDI 4-20/T34 4-20 50029218350000 1880720 DUCK IS UNIT SDI 4-26/034 4-26 50029218700000 1881110 DUCK IS UNIT SDI 4-28/N37 4-28 50029225590000 1950690 DUCK IS UNIT SDI 4-32/K38 4-32 50029227050000 1961550 DUCK IS UNIT SDI 4-34/038 4-34 50029224820000 1940740 DUCK IS UNIT SDI 4-38/K34 4-38 50029222650000 1920420 DUCK IS UNIT SDI 4-40/P43 4-40 50029217310000 1870560 DUCK IS UNIT SDI 4-42/P38 4-42 50029222540000 1920190 DUCK IS UNIT SDI 4-44/M44 4-44 50029222549500 1970470 DUCK IS UNIT SDI 4-44AM40XX 4-44AXX 50029219570000 1890690 DUCK IS UNIT SDI 4-46/N39 4-46 50029219720000 1890970 DUCK IS UNIT SDI 4-48/K43 4-48 50029219400000 1890440 DUCK IS UNIT SDI 4-50/K41 4-50 Pages NOT Scanned in this Well History File XHVZE This page identifies those items that were not scanned during the initial scanning Project. They are available in the original file and viewable by direct inspection. I/~,jg? File Number of Well History File PAGES TO DELETE Complete RESCAN Color items- Pages: GraYScale, halftones, pictures, graphs, charts- Pages', Poor Quality Original- Pages: Other - Pages: DIGITAL DATA Diskettes, No. Other, No/Type .OVERSIZED .Logs of various kinds Other coMMENT~: Scanned TO RE-SCAN Notes: Nathan Lowell Re-Scanned by: Beverly Mildred Daretha Nathan Lowell Date: • • bp BP Exploration (Alaska) Inc. Attn: Well Integrity Coordinator, PRB -20 Post Office Box 196612 Anchorage, Alaska 99519 -6612 May 22, 2012 Mr. Jim Regg Alaska Oil and Gas Conservation Commission •6 - 6 333 West 7 Avenue A 63° Anchorage, Alaska 99501 Q Subject: Corrosion Inhibitor Treatments of Endicott Row 4 Dear Mr. Regg, Enclosed please find multiple copies of a spreadsheet with a list of wells from Endicott Row 4 that were treated with corrosion inhibitor in the surface casing by conductor annulus. The corrosion inhibitor is engineered to prevent water from entering the annular space and causing external corrosion that could result in a surface casing leak to atmosphere. The attached spreadsheet represents the well name, API and PTD numbers, top of cement depth prior to filling and volumes of corrosion inhibitor used in each conductor. As per previous agreement with the AOGCC, this letter and spreadsheet serve as notification that the treatments took place and meet the requirements of form 10 -404, Report of Sundry Operations. If you require any additional information, please contact me or my alternate, Gerald Murphy, at 659 -5102. Sincerely, / -12 Mehreen Vazir BPXA, Well Integrity Coordinator • • BP Exploration (Alaska) Inc. Surface Casing by Conductor Annulus Cement, Corrosion inhibitor, Sealant Top-off Report of Sundry Operations (10-404) Endicott Row 4 Date: 10/07/10 Corrosion Initial top of Vol. of cement Final top of Cement top off Corrosion inhibitor/ Well Name PTD # API # cement pumped cement date inhibitor sealant date ft bbls ft na gal END4 -02 / Q -28 1880220 50029217890000 0.3 NA 0.3 NA 1.70 9/29/2010 EN D4-04 / T -30 2090190 50029219680100 4 2.0 0.8 9/2/2010 3.40 9/29/2010 �7 END4-06A / Q-30 1961660 , 50029217230100 4 3.0 0.1 9/6/2010 2.55 9/30/2010 END4-08 / P -27 1870080 50029216920000 5 3.0 0.8 9/2/2010 6.00 9/30/2010 EN D4-10A / L -28 2022380 50029224640100 15 12.5 0.5 9/6/2010 1.70 9/30/2010 END4 -14A / S -37 2080120 50029218630100 0.3 NA 0.3 NA 1.70 9/30/2010 END4 -18 / S -30 1881490 50029218960000 7 2.0 0.8 9/2/2010 4.30 9/30/2010 END4 -20 / M-35 1861730 50029216400100 1.5 0.5 0.4 9/6/2010 2.55 10/4/2010 END4-26 / 0-34 1880720 50029218350000 1.2 NA 1.2 NA 10.20 10/4/2010 END4 -28 / N-37 1881110 50029218700000 2 1.0 0.5 9/6/2010 3.40 10/4/2010 END4 -32 / K -38 1950690 50029225590000 6 6.0 0.7 9/2/2010 6.80 10/4/2010 END4-34 / 0-38 1961550 50029227050000 4 1.0 0.3 9/6/2010 1.70 10/4/2010 END4 -38 / K-34 1940740 50029224820000 10 7.0 0.3 9/6/2010 1.70 10/4/2010 END4 -40 / P-43 1920420 50029222650000 1.5 0.3 0.4 9/6/2010 3.40 10/4/2010 EN D4-42 / P -38 1870560 50029217310000 0.5 NA 0.5 NA 3.40 10/4/2010 EN D4-44 / M-44 1920190 50029222540000 1.5 0.3 0.5 9/6/2010 1.70 10/4/2010 END4 -46 / N -39 1890690 50029219570000 3 2.5 0.8 9/6/2010 5.10 10/4/2010 END4 -48 / K-43 1890970 50029219720000 4 2.0 0.8 9/6/2010 5.10 10/4/2010 END4 -50 / K-41 1890440 50029219400000 1.3 0.1 0.3 9/6/2010 1.70 10/4/2010 TE OF ALASKA • • ALASKA OIL AND CONSERVATION COMMISSION REPORT OF SUNDRY WELL OPERATIONS 1. Operations Abandon ❑ Repair Well ❑ Plug Perforations ❑ Stimulate Other 0 FURMANITE WRAP Performed: Alter Casing ❑ Pull Tubing ❑ Perforate New Pool ❑ Waiver❑ Time Extension ❑ Change Approved Program ❑ Operat. Shutdown ❑ Perforate ❑ Re -enter Suspended Well ❑ 2. Operator BP Exploration (Alaska), Inc. 4. Well Class Before Work: 5. Permit to Drill Number: Name: Development la Exploratory ❑ - 196 -1660 3. Address: P.O. Box 196612 Stratigraphic Service ❑ 6. API Number: Anchorage, AK 99519 -6612 � 50- 029 - 21723 -01 -00 8. Property Designation (Lease Number : 9. Well Name and Number: P rtY 9 ( ) ADLO- 047502 ,. 4- 06A/Q -30 10. Field /Pool(s): ENDICOTT FIELD / ENDICOTT OIL POOL 11. Present Well Condition Summary: Total Depth measured 12687 feet Plugs (measured) 10342 feet true vertical 10230.68 feet Junk (measured) None feet Effective Depth measured 12687 feet Packer (measured) SEE BELOW feet true vertical 10230.68 feet (true vertical) 5221 5858 5899 feet Casing Length Size MD TVD Burst Collapse Structural Conductor 161' 30" 39 - 200 39 - 200 Surface 2499' 13- 3/8 "68# L -80 38 - 2537 38 - 2535 4930 2270 Production 10684' 9 -5/8" 47# NT95HS 37 - 10721 37 - 9772 8150 5080 Liner 5270' 7 -5/8" 29.7# NT -95HS 5223 - 10493 5221 - 9590 8180 5120 Liner 309' 7" 29# N -80 10486 - 10795 9584 - 9832 8160 7020 Liner 2316' 4 -1/2 "12.6# L -80 10357 - 12673 9485 - 10225 8430 7500 Perforation depth: Measured depth: SEE ATTACHED - — — True Vertical depth: _ — — — Tubing: (size, grade, measured and true vertical depth) 4 -1/2" 12.6# L -80 36 - 10354 36 - 9483 2 -3/8" 4.7# L -80 5864 - 5911 5858 - 5904 Packers and SSSV (type, measured and true vertical depth) 7 -5/8" Baker SBP Packer 5223 5221 �� n 4 -1/2" KB Packer 5864 5858 4 . _ -f l 1 4 -1/2" KB Packer 5906 5899 4 -1/2" Baker S -3 Perm Packer 9439 4 -1/2" Baker ZXP Packer RECE1 17- 9485 12. Stimulation or cement squeeze summary: ( j�a . Intervals treated (measured): Treatment descriptions including volumes used and final pressure: iki&ska u l i pan Co ssion 13. Representative Daily Average Production or Injection Data Oil -Bbl Gas -Mcf Water -Bbl Casing Pressure Tubing pressure Prior to well operation: 192 13,136 2,743 784 Subsequent to operation: 14. Attachments: 15. Well Class after work: Copies of Logs and Surveys Run Exploratory❑ Development 0 ■ Service ❑ Stratigraphic ❑ Daily Report of Well Operations X 16. Well Status after work: Oil ,. 0 Gas ❑ WDSPL ❑ GSTOR ❑ WINJ ❑ WAG❑ GINJ ❑ SUSP❑ SPLUG ❑ 17. I hereby certify that the foregoing is true and correct to the best of my knowledge. Sundry Number or N/A if C.O. Exempt: NA Contact Joe Lastufka Printed Na oe Lastu ilik l Title Petrotechnical Data Technologist Signatu = 1�k _ Phone 564 -4091 Date 11/2/2011 Form 10-404 Revised 10/2010 , , S N�� 4 01 it 4 "oi jeit e grigipal Only 4- 06A/Q -30 196 -166 . PERF ATTACHMENT Sw Name Operation Date Perf Operation Code Meas Depth Top Meas Depth Base Tvd Depth Top Tvd Depth Base 4- 06A/Q -30 12/2/96 PER 11,350. 11,445. 9,970.05 9,977.51 4- 06AIQ -30 12/2/96 PER 11,890. 11,910. 9,973.31 9,975.24 4- 06A/Q -30 12/2/96 PER 12,100. 12,115. 10,016.18 10,020.88 4- 06A/0-30 12/2/96 PER 12,240. 12,275. 10,061.65 10,073.52 4- 06A/Q -30 11/1/98 APF 10,933. 10,953. 9,916.04 9,923.04 4- 06A/Q -30 7/7/02 MLK 5,863. 5,864. 5,857.5 5,858.48 4- 06A/Q -30 9/1/02 MIS 5,863. 5,883. 5,857.5 5,877.05 4- 06A/Q -30 9/1/08 APF 12,030. 12,050. 9,995.57 10,000.95 4- 06A/Q -30 9/2/08 APF 12,010. 12,030. 9,990.73 9,995.57 4 -06AIQ -30 9/3/08 APF 11,670. 11,690. 9,974.94 9,974.15 4- 06AIQ -30 9/4/08 APF 11,205. 11,225. 9,956.22 9,958.05 4 -06AIQ -30 9/5/08 APF 11,010. 11,030. 9,938.99 9,942.97 4- 06A/Q -30 9/5/08 APF 11,030. 11,050. 9,942.97 9,945.76 4 -06A/Q -30 9/5/08 APF 11,150. 11,170. 9,951.94 9,953.35 4- 06A/Q -30 9/6/08 APF 11,000. 11,010. 9,936.61 9,938.99 • 4- 06A/Q -30 2/23/09 BPS 10,316. 12,275. 9,453.78 10,073.52 4 -06A/Q -30 10/26/09 BPP 10,316. 12,275. 9,453.78 10,073.52 4- 06A/Q -30 7/26/11 BPS 10,342. 10,933. 9,473.53 9,916.04 AB ABANDONED PER PERF APF ADD PERF RPF REPERF BPP BRIDGE PLUG PULLED SL SLOTTED LINER BPS BRIDGE PLUG SET SPR SAND PLUG REMOVED FCO FILL CLEAN OUT SPS SAND PLUG SET FIL FILL SQF SQUEEZE FAILED _MIR MECHANICAL ISOLATED REMOVED SQZ SQUEEZE MIS MECHANICAL ISOLATED STC STRADDLE PACK, CLOSED MLK MECHANICAL LEAK STO STRADDLE PACK, OPEN OH OPEN HOLE • • • 4-06A/Q-3 0 DESCRIPTION OF WORK COMPLETED NRWO OPERATIONS EVENT SUMMARY 10/4/2011,T/I/O = 30/50/25. Temp = SI. Prep for Furmanite (Furmanite prep). AL is SI @ 3 ;casing & lateral valve, ALP @ 110 psi. TBG @ surface. IA & OA FL's near surface. Bled TBGP from 30 psi to 0 psi (fluid, to BT) in 6 min. Bled IAP from 50 psi to 0 psi (gas, to BT) in 5 min. Bled OAP from 25 psi to 0 psi (gas, to BT) in 5 min. Purged !OA w/ 50 psi of N2 2x. Installed 25 psi N2 cap on OA. Removed floor braces for more work area in cellar. Monitor for 30 min. FWHP's = Vac /0 +/25. Job Complete. SV, WV = C. SSV, MV = O. IA, OA = OTG. 10/5/2011;T/I/O = VAC /5/20. Temp = SI. Assist Furmanite. (Furmanite wrap). AL SI @ casing ;valve. No sign of LEL's present at this time. Service Company sand blasted SH. 'Bled OAP to 0 psi. Maintain open bleed. Composite Wrap technicians applied E- 'Glass layer of composite wrap. Maintain Open bleed on OA and monitor. See log for details. 10/6/2011 IT /I /O = VAC /12/7. Temp = SI. Assist Furmanite. (Furmanite wrap). AL SI @ casing ;valve. No sign of LEL's present at this time. Service Company sand blasted SH. Bled OAP to 0 psi. Maintain open bleed. Composite Wrap technicians applied E- ' Glass layer of composite wrap. Maintain Open bleed on OA and monitor. See log for details. `Continued on 10 -7 -11 AWGR's WSR. 10/7/2011;T/I/O = VAC /12/5. Temp =SI. Assist Furmanite (Furmanite Wrap). AL is connected, :SI © casing valve and pipe wrap. ALP =0 psi. Held open bleed on OA & monitor SH 'temp, see log for details. 10/8/2011,T/I/O = VAC /12/5. Temp =S1. Assist Furmanite (Furmanite Wrap). AL is connected, SI © casing valve and pipe wrap. ALP =O psi. Held open bleed on OA & monitor SH temp, see log for details. 10/9/2011 'T /I /O = VAC /12/5. Temp =SI. Assist Furmanite (Furmanite Wrap). AL is connected, SI @ casing valve and pipe wrap. ALP =0 psi. Held open bleed on OA & monitor SH temp, see log for details. 10/10/2011:T/I/O = VAC /12/5. Temp =SI. Assist Furmanite (Furmanite Wrap). AL is connected, SI @ casing valve and pipe wrap. ALP =0 psi. Held open bleed on OA & monitor SH ;temp, see log for details. 10/11/2011 :T /I /O = VAC /11/5. Temp =S1. Assist Furmanite (Furmanite Wrap). AL is connected, Si @ casing valve and pipe wrap. ALP =0 psi. Held open bleed on OA & monitor SH ,temp, see log for details. 10/12/2011'T/I/O = VAC /11/5. Temp =SI. Assist Furmanite (Furmanite Wrap). AL is connected, SI @ casing valve and pipe rack. ALP =0 psi. Held open bleed on OA & monitor SH `. temp, see log for details. Job continued on 10- 13 -11. 10/13/2011 ;T /1 /O = VAC /11/5. Temp =SI. Assist Furmanite (Furmanite Wrap). AL is connected, SI © casing valve and pipe rack. ALP =0 psi. Job continued from 10- 12 -11. Held open bleed on OA & monitor SH temp, see log for details. 10/14/2011T/I/O = VAC /11/5. Temp =S1. Assist Furmanite (Furmanite Wrap). AL is connected, SI © casing valve and pipe rack. ALP =O psi. Job continued from 10- 13 -11. :Composite Wrap technicians applied layer of composite wrap. Held open bleed on :OA & monitor SH temp, see log for details. ��� �� ��� �� / 1015/2O111T/V VA C/11/5. 1/5. Temp=SI. Assist F nnan m ` -`' . AL ----n--a ^ - - --' 'k� � - © 10-14-11. �G| ' valve �ALP=O�continued oome� ' �Conlpooitm Wrap technicians applied layer of composite wrap. Held open on 'OA&mnondorSHtemp see Iog for details. Continued on 10-16-11 D |O/YN/GRS ' I0 = VAC/10/3. Temp=S1. Assist Furmanite (Furmanite Wrap). AL is connected„: :SI © casing valve and pipe rack. ALP=0 psi. Job continued from 10-15-11. 1 ;Composite Wrap technicians applied layer of composite wrap. Held open bleed on :OA & monitor SH temp, see log for details. i -''----- 1017/2011 . Temp =Si K4onitorVVHP's & Heater Kzoo � --- - - Monitor IAP wrap. IAP and ` in --'-''—'^~ r' !the VVHP� =Veo/S/O. psi iSV@VVV=C. MV&8GV=[1 IA & OA = OTG NOVP . 1O/17/2O11:l7K{}=Vac/1O/5. Temp = SI. MonitorVVHP's & ob* U��otF ar unn - - ! - (Post �� - ''�-,'� �K8ondork�P&[)APpou Funnanita wrap, see log for details. Final WHP's = Vac/10/5. !Job Complete. :GV&VVV=C. MV&8SV=D. kA@OA=OTG. NOVP. 1018/2011;T/V10 =VAC/ 2/6. Temp =Gi K8onitorNHPo !--''- --'furmanite - --' *--� ! :k»Q�vdebaUm Final VVHPo=\�\�/12/8. . � ={}. U� OA= OTG. / 1O/18/2O11:T/K0=VAC/ 2/6. Temp =� SI. Monitor -----' -- (Post Fu ito V ' -- --� �K8 for Final WHPs ''� .AC/ 2/7. �GV.VVV = C. SSV, MV = O. IA, OA= OTG. NOVP. 1018/2011:771/0 =Vao/ 2/7. Temp = Si Monitor WHPs & Heater '- - (Post Furmanite \ ). ALP =D psi, ALSI @ casing valve &pipe rack. See Iog for details. Final WHPs = ;Vac/12/7. |GV.VVV=(�. SSV.K4V=O. k4@C�A=[�TG. NOVP. -- - --- -- ---- ------ '------ --- ' -- --- | 10M9/2011:TlO=\AC/12/7. Temp=SI. MonitorWHPs and Heater (Post Furmanite Repair). AL |8|��oaoingvo���piperack See Final VVHPm=Vao/ 2/7 © rack. ~ details. ' / ' ' S�WV=C @GV�V=� IA,OA=OTG. NOVP. ' SSV,MV=0. � i - -- - -- --'--' - -' - - - - -- '- ---'- - / 1&1S/2O11'T/K�=VA�/ 1/7. Temp �on�orVVHPm&HeaterMzoatFurnlande AL ! ' (Post ~' Wrap). ^ :S|@ casing valve, ALP =Opsi. Monitored WHPs & SH temperature post Furmanite :Continued onVVSR1O/2D/11. 1018/2011 77K0 =Vam/12/7. Temp = SI. Monitor WHPs & Heater. (Post Furman Wrap). ,ALP =D psi, ALG|@ casing valve & pipe rack. IAP increased 1 psi. See Iog for :details. Final VVHPo =Vao/13/7. � 8V ' VVV={� SSV. MV = CJ . U\&OA= OTG. . NOVP -- - - 10/20/2011 Tamo=Si Monitor VVHPo& Heater (Pomt Furman Wrap). ALP=0 =0! 'poi.8|© casing valve. Monitored WHP's & temps during Nightshift for Furmanite :repair (see Iog for details). :°° Continued on next days VVSR°° |SV.VVV=C� SSV, MV=0. ���A=�TG� NOVP. . ' - � 1O/2O/2O11T/K0 =\�\C/ 1/7. Temp =Gi Mon�orVVHPo�� Heater U�omtfurnns . wrap). AL ! |/ i��casing valve, psi. K�on�oredVVHPo and GH ' perature post Furmanite ;wrap. SV, WV = C. S8V.K«V=O. IA, OA = OTG. NOVP. 10/20/2011 TIO= VAC/12/7. Temp=SI. Monitor WHPs & Heate (Post Furmanit Wrap). - --| ;Pressures are unchanged from yesterday See Iog for details. Final WHPs= /\AC/12/7. / @V,WV=C SSV,MV=0. IA,OA=OTG. NOVP ��� �� 1O/21/2O11 l7K[=Vac/12/8. Temp=SI. Monitor VVHPo& Heater (pootfurn�en�ovvrau)� ALP=O (Post wrap). psi, SI @ casing valve. ** Continued from 10/20/11 WSR. Monitored WHP's & )temps for Funnande �r(oea|oQ��dmtaihA. � ! . (see . ��o�nu��onD�o ��S�� } ' '' {�A=[)TG NOVP. �_'_--- . 1021/2011iT8/0=Vod11/8. Temp = SI. Monitor WHPs & Heater (Pos furmanite repair). (Furmanite prep). ALP =U psi, ALS|@ casing valve. Continued from 10-21-11 day shift WSR. Monitored WHP's & temp for Furmanite repair (see log for details). ! Continued on1D-22-11VVGR. GV IA & OA = OTG. NOVP. 10/21/2011 T/|A0=Vao/8/8.. Temp=Gi Monitor WHPs& Heater (Post furmanitewrap). ALPO poi G| @ casing valve. See log for details. Final WHPs= Vac/10/8. Job on going. |GV WV= C.G@V. MV= O. 1A, OA= OTG. NOVP. 10/22/2O11 ����1� �mp�| WHPs (P���on���G|��e�g�� ' ' ' Monitor. ` ' @ .| ALP=0 psi. Monitored WHPs & SH temp pos Furmanite wrap. Heater removed. SV.VVv=C. GSV.K4V=O. |A�A=C�TG. NOVP. ` ---- — !---- -'---'- C) - ----- -'-' --- -- '--- - -- - 10/23/2011T/|X3 =Voc/11/8. Temp = SI. Monitor WHPs & Heater. (Post furmanite wrap). ALP \=O psi, ALG|8D casing valve. Continued from 10-21-11 WSR. Monitored WHPs & :temp for Furmanite repair (see Iog for details). Final WHPs = Vac/11/8. 8V.VVV=C. SSV, yWV=C}. |A&OA=CJTG. NOVP. 10/27/2011i T/I/0= 3 i 0. Temp= Gi| |T{ ***Inconclusive*** to 120 psi diesel (Post - l Furmanite). ALP=O psi, G|@ casing valve. OA FL near surface. increased OAP to 100 psi using a total of 11 bbls of diesel and couid not reach test pressure. OAP decreased to 25 psi as soon as pump was shut down. Monitored OAP for 30 mins. OAP stable @ 25 psi. No signs of SH leak, Furmanite wrap clean & dry. Bled OAP to 0 psi (fluid, <.25 bbl). Hung MIT tags. FWHPs= 30/50/0 Job complete, See log /fordeboi|o ' ' SV, WV= C. SSV, MV= 0. 1A, OA= OTG. NOVP. _______ FLUIDS PUMPED BBLS 1 DIESEL 1 l TOTAL )REE " " CIW SAFETY NOTES: H2 DINGS AVERAGE 230 - 260 WELLHEAD = MCEVOY i D D RAF E 4 -O 6� PPM ON A/L & GAS I CTORS. WELL REQUIRES A ACTUATOR = BAKER C aI SSSV. WELL ANGLE> 70° © 12192' `*4 -1/2" CHROME KB. ELEV = 55.10' 1 NIPPLES" BF. ELEV = 16' KOP = ?? 1503' H4-1/2" HXO SSSV NIP, D = 3.813" I Max Da A _ ngle = 94" @ 11619' L .... " ...... tum MD = 12223' Datum TVD= 10000 SS GAS LIFT MANDRELS 113 -3/8" CSG, 68 #, L -80 BTRS, ID = 12.415 H 2500' ST MD TV D DEV VLV LATCH PORT DATE 5 3436 3434 1 DOME BK 16 04/07/09 Minimum ID = 1.875" @ 5864' 1 4 5868 5862 12 DOME BK 20 10/26/09 2 -3/8" KB STRADDLE PATCH 3 7804 7496 38 DMY BK 0 10/08/96 2 9195 8605 41 DMY BK 0 10/08/96 ITOPOF 7 -5/8" TIEBACK I---I 5218' I 1 $ 1 10134 9316 41 DMY BK 0 10/08/96 135' BKR KB PATCH, ID = 1.875" (X NIP) H 5864' - 5911' I 25 F S. 1 I 10286' I- 14 -1/2" HES X NIP (9 -CR), ID = 3.813" 1 CE X 10297' H7 -5/8" X 4 -1/2" BKR S -3 PKR, ID = 3.875" I ' ' I 10320' H4-1/2" HES X NIP (9 -CR), ID = 3.813" 1 4 -1/2" TBG, 12.6 #, L -80 TBTC, 10354' 10342' I- 14 -1/2" HES XN NIP (9 -CR), ID = 3.725" I .0152 bpf, ID = 3.958" ® 10342' H2 -3/8" XN REDUCING NIP (05/21 /09), ID = 1.875" I (TOP OF 4 -112" LNR I 10400' 10342' H2-3/8" XX PLUG (07/26/11) I / 7 -5/8" LNR, 29.4 #, NT95HS FL4S, —I 10486' ►� 10354' I- I4 -1/2" WLEG, ID = 3.958" 1 .0459 bpf, ID = 6.875" . TOP OF 7" LNR I—I 10486' 9 -5/8" CSG, 47 #, NT95HS NSCC, ID = 8.681" H 10721' I I , 7" LNR, 29 #, N -80 BTRS, -I -10820 MILLOUT WINDOW (4.06A) 10795' - 10820' .0371 bpf, ID = 6.184" PERFORATION SUMMARY REF LOG: ? ?? ANGLE AT TOP PERF: 68° @ 10933' Note: Refer to Production DB for historical perf data SIZE SPF INTERVAL Opn /Sqz DATE ' 2 -1/2 6 10933 - 10953 0 ? ' 1.56 6 11000 - 11050 0 09/06/08 ' 1.56 6 11150 - 11170 0 06/06/08 ' 1.56 6 11205 - 11225 0 09/04/08 ' 2 -3/4 4 11350 - 11445 0 ? ' 1,56 6 11670 - 11 690 0 09/03/08 "2-3/4 4 11890 - 11910 0 ? -12156 I-1 ECP - 4.5" AT BASE OF FIII 1 ' 1.56 ' 6 12010 - 12050 0 09/01/08 OE '2 -3/4' 4 12110 -12115 0 ? '2-3/4 ' 4 12240 - 12275 0 ? 14-1/2" LNR, 12.6 #, L -80, .0152 bpf, ID = 3.958" I-I 12587' I A DATE REV BY COMMENTS DATE REV BY COMMENTS ENDICOTT' UNIT ?? ?? ORIGINAL 12/19/09 MBM/SV GLV C/0 (10/26/09) WELL: 4 -06A / Q -30 10/08/96 SM S SIDETRACK (4 -06A) 01/13/11 ? /JMD REFORMATTED PERMIT No: 1961660 06/02/09 JLJ /JMD CORRECTION 02/17/11 MB /JMD ADDED SSSV SAFETY NOTE API No: 50- 029 - 21723 -01 09/08/09 RRD/TLH PATCH SET (07/05/09) 08/14/11 JLJ/ PJC SET XX PLUG (07/26/11) SEC 8, T11 N, R17E, 2580' FSL & 836' FEL 10/01/09' BSE/SV PATCH PULLED (09/29/09) 08/15/11 DW /JMD ADDED H2S SAFETY NOTE 10/15/09 MV /PJC SET PATCH (10/13/09) BP Exploration (Alaska) ProActive Diagnostic Services, Inc. To: AC~CC Christine Mahnken 333 W. 7th Ave Suite 100 Anchorage, Alaska 99501 (907) 793-1225 RE : Cased Hole/Open Hole/Mechanical Lags and/or Tubing Inspection(Caliper/ MTT) The technical data listed below is being submitted herewith. Please acknowledge receipt by returning a signed copy of this transmittal letter to the following BP Exploration (Alaska), Inc. Petrotechnical Data Center Attn: Joe Lastuflca LR2-1 900 Benson Bhnl. Anchorage, Alaska 99508 and ~; . ~nr, RiroActive Diagnostic Services, Inc. Attn: Robert A. Richey / 130 West International Airport Road '9(0 ' tlo~ /''~ (o~'~f Suite C Anchorage, AK 99518 Fax: (907) 245-8952 1 ] Leak Detection - STP 24Feb-09 406A/C~-30 1 Color Log / EDE 50-029-21723-01 2] Signed : Date : a Print Name: PROACTNE DIAGNOSTIC SERVICES, MC., 130 W. INTERNATIONAL AIRPORT RD SUITE C, ANCHORAGE, AK 99518 PHONE: (907)245-8951 FAX: (907)245$8952 E-MAIL: ~~~~nvd as~ca~~er~~a\;~®g,~~a~=a WEBSI7'E:%v~,u~v,~r~or~+3~~t.v®r~ C:\DocumeNS and Settings\Cromer\Desktop\T7anstcrit_BP.docx ._r STATE OF ALASKA ALA OIL AND GAS CONSERVATION COM~ION ~ :`' „~ ~~, R~Df1RT f1F CI IAlI1RV \A/FI I ~1DGC2AT1(1AIC ~g 1. Operations Abandon ~ Repair Well ~ Plug Perforations ~ Stimulate ~ Other Performed: Alter Casing ~ Pull Tubing ~ Perforate New Pool ~ Waiver ~ Time Extension Change Approved Program ~ Operat. Shutdown ~ Perforate Q , Re-enter Suspended Well 2. Operator BP Exploration (Alaska), Inc. 4. Current Well Class: 5. Permit to Drill Number: Name: Development Exploratory ~ 196-1660 ' 3. Address: P.O. Box 196612 StratlgraphlC ~~ ServlCe 6. API Number: Anchorage, AK 99519-6612 50-029-21723-01-00~ 7. KB Elevation (ft): 9. Well Name and Number: 56 KB - 4-06A/0-30. 8. Property Designation: 10. Field/Pool(s): ADLO-047502 ~ ENDICOTT Field/ ENDICOTT OIL Pool 11. Present Well Condition Summary Total Depth measured 12686 ' feet Plugs (measured) None true vertical 10230.68, feet Junk (me red) a s u None gQ ~~^ r ~ ~~~' ~~~ ~~ ~`~ L~Ut7 Effective Depth measured 12585 feet true vertical 10189 feet Casing Length Size MD TVD Burst Collapse CONDUCTOR 161 30" Surface - 200' Surface - 200' SURFACE 2498 13-3/8" 68# L-80 Surface - 2537' Surface - 2479' 5020 2260 PRODUCTION 1690 9-5/8" 47# nt95hs Surface - 10759' Surface - 9746' 8150 5080 LINER 1214 7" 29# N-80 10486' - 11700' 9584' - 9974' 8160 7020 LINER 2187 4-1/2" 12.6# L-80 10400' - 12587' 9518' - 10189' 8430 7500 Perforation depth: Measured depth: SEE ATTACHED - True Vertical depth: _ _ _ Tubing: (size, grade, and measured depth) 4-1/2" 12.6# L-80 Surface - 10354 0 0 - Packers and SSSV (type and measured depth) 7-5/8" TIW HBBP PKR 10297 0 0 0 0 0 0 12. Stimulation or cement squeeze summary: Intervals treated (measured): Treatment descriptions including volumes used and final pressure: 13. Representative Daily Average Production or Injection Data Oil-Bbl Gas-Mcf Water-Bbl Casing Pressure Tubing pressure Prior to well operation: 159 9541 2525 334 Subsequent to operation: 194 10854 2563 287 14. Attachments: 15. Well Class after proposed work: Copies of Logs and Surveys Run Exploratory I~ Development ~. Service Daily Report of Well Operations X 16. Well Status after proposed work: Oil 'Gas ~~' WAG GINJ ~~' WINJ WDSPL 17. I hereby certify that the foregoing is true and correct to the best of my knowledge. Sundry Number or N/A if C.O. Exempt: N/A Contact Gary Preble Printed Name Gary Preble ~~ ~ ~ Title Data Management Engineer Signature ~ ~~ Phone 564-4944 Date 9/18/2008 ./L Fnrm 1n-dnd Ravic .r1 nd/~nnF ~ . i €: r ~ i3~ ~x)~13 ~~ ~ ~~~~ Siihmit (~rininal ~nlv ~r_ a ~ .n ~' I ' i - ~ k ~ E 4-06A/Q-30 196-166 PERF ATTACHMENT • Sw Name Operation Date Perf Operation Code Me_as Depth Top Meas Depth Base Tvd Depth Top Tvd Depth Base 4-06A/Q-30 12/2/96 PER 11,350. 11,445. 9,970.05 9,977.51 4-06A/Q-30 12/2/96 PER __ 11,890. 11,910. 9,973.31 9,975.24 4-06A/Q-30 12/2/96 PER _ 12,100. 12,115. 10,016.18 10,020.88 4-06A/Q-30 12/2/96 PER 12,240. 12,275. 10,061.65 10,073.52 4-06A/Q-30 11/1/98 APF 10,933. 10,953. 9,916.04 9,923.04 4-06A/Q-30 7/7/02 MLK __ 5,863. 5,864. 5,857.5 5,858.48 4-06A/Q-30 9/1/08 APF 12,030. 12,050. 9,995.57 10,000.95 4-06A/Q-30 9/2/08 APF 12,010. _ 12,030. 9,990.73 9,995.57 4-06A/Q-30 9/3/08 APF _ 11,670. 11,690. 9,974.94 9,974.15 4-06A/Q-30 9/4/08 APF 11,205. 11,225. 9,956.22 9,958.05 4-06A/Q-30 9/5/08 _ APF 11,010. 11,030. 9,938.99 9,942.97 4-06A/Q-30 9/5/08 APF 11,030. ~ 11,050. 9,942.97 9,945.76 4-06A/Q-30 9/5/08 APF 11,150. ~ 11,170. 9,951.94 9,953.35 4-06A/Q-30 9/6/08 APF 11,000. 11,010. 9,936.61 9,938.99 AB ABANDONED PER PERF APF ADD PERF RPF REPERF BPP BRIDGE PLUG P ULLED _ SL SLOTTED LINER BPS BRIDGE PLUG SET SPR SAND PLUG REMO VED _ FCO FILL CLEAN OUT __ SPS SAND PLUG SET _ FIL FILL SQF SQUEEZE FAILED MIR MECHANICAL ISOLATED REMOVED SQZ SQUEEZE _ _ MIS MECHANICAL ISOLATED STC STRADDLE PACK, CLOSED _ MLK MECHANICAL LEAK _ STO STRADDLE PACK, OPEN _ OH OPEN HOLE LJ • • 4-06A/Q-30 DESCRIPTION OF WORK COMPLETED NRWO OPERATIONS EVENT SUMMARY ACTIVITYbATE SUMMARY. 8/31/2008;CTU #6 1.75" CT <InterACT is not Publishing> Weather STBY, can't lower mast to 'move to END4-06. Wind at 27 mph gusting to 32 mph. Wind has died down RD 'and move to END4-06. MIRU. MU Weatherford CTC and SWS memory GR/CCI fogging bha. PT on well failed. Call grease crew to service well. Swab valve will not hold pressure. Discuss swab valve changeout with Endicott operations and well tender. Safe-out well and perform no-flow test on master and SSV. Rig down'; ', `coil. Valve crew setting BPV to begin swapping out swab valve. '`'`'`Job continued on WSR 8/31/08*** 9/1/2008 CTU #6 1.75" CT <InterACT is not Publishing> ***Job continued from 8/31/08*' DSM working on changing out Swab Valve & Barrel swap on SSV. Valve crew finished replacing swab and SSV Barrel. BU CTU and RU. CTU rigged up, WO scaffold crew to construct platform on top of well house (daylight crew). MU and RIH with Weatherford MHA and SWS GR/CCL logging bha. Tag @ 12143' ctmd. PUH to 12128' ctmd. Log up @ 60 fpm to 11900' and paint flag(red). Continue logging up hole at 60fpm to 11000' ctmd. POOH. OOH. Recovered data correct +3'. RIH with pert gun run #1 20' x 1.56" HSD PJ1606 charge 6spf 60 phasing from 12030' to 12050' . On depth at 12030' top shot depth and drop 1/2" ball. No 'indication of ball on seat at calc volume. Saw a pressure spike to 1000psi and dropped off, not sure if we caught fluid or guns fired. Continue pumping and ramping rates up and down. POOH to check if guns fired. ~'#Job continued on WSR 9/2/08""" 9/1/2008 T/I/0=1100/1200/0. Set and pull 4" CIW H BPV thru tree, for swab valve c/o. 1-2' ext used, tagged @ 98". No problems. Replaced New Style Axelson powerhead on 4" CIW SSV. No problems. • • 9/2/2008 CTU #6 1.75" CT <InterACT is not Publishing> ***Job continued from 9/1/08*** POOH check to see if guns fired. Guns fired, LD spent guns. MU Gun run #2 and RIH. Uncertain of original flag depth. POOH for additional logging run. RD perf guns. MU SWS logging bha. RIH with Weatherford MHA and SWS GR/CCL logging bha. Log from 12100' ctmd to 11950' at 60 fpm. Paint flag(red). Continue logging up at 60fpm to 11000 ctmd. POOH. OOH Check logging tools for data. Pressure test Weatherford MHA to 3500psi. Good data +3.5' correction. RIH with #2 gun run 20' x 1.56" HSD PJ1606 charge 6spf 60 degree phasing from 12010' to 12030'. At flag use sand paper to scratch the coil up to help identify where fla~ g was if the pack off removes it. RIH to shot depth and drop 1/2" aluminum ball. No indication ball landed and fired guns. Drop 2nd ball (1/2" steel ball) '""'Job continued on WSR 9/3/08*"* 9/3/2008 CTU #6 1.75" CT <InterACT is not Publishing>'`**Job continued from 9/2/08*"* ''Pumping 2nd ball around (1/2" Steel this time). No indication either ball landed and I'fired guns, POOH and check guns. OOH and guns fired, all shots fired. LD spent ','guns and LD WTF MHA and set injector on deck to change pack offs and inspect '''chains. '*'`'`Job in progress"'`'` 9/3/2008',CTU #5 1.75" CT cont w/chain & bearing inspection. RIH w/ 20' x 1.56" HSD ',guns.Fire gun #3 11670' - 11690' w/1.56"HSD 6spf PJ1606 Charge 60 degree phasing POOH at surface confirm shots fired recovered ball. Perform weekly BOP test. *""Job continued on 9/4/08 WSR'`'`'` 9/4/2008'CTU #5 1.75" CT Continued from 9/3/08 WSR Perform weekly BOP test. M/U and 'RIH with Weatherford MHA and SLB mem. Log 60 fpm from 12125 to 11000'. ','.paint flag C~3 11190. RIH 20' 1.56" HSD PJ1606 guns. shoot perf interval 11,205- ',11,225.,pooh. RIH 20' 1.56" PJ1606 guns 6spf 60 degree guns. ***Continued on 9/5/08 W S R *"" • CJ 9/5/2008 CTU #6 1.75" CT Continued from 9/4/08 WSR RIH with #5 gun run 20' x 1.56" PJ1606 charge 6spf 60 degree from 11150' to 11170'. Guns fired POOH At surface all shots fired recovered ball. MU new WOT MHA. RIH w/MHA and Memory logging tools. RIH w/ # 6 gun run 20' x 1.56" PJ1606, 6spf, 60 degree phasing. shoot interval 11030'- 11050'. pooh. Shots fired recovered ball MU/RIH #7 gun run 20' x 1.56" PJ1606 charges,6 spf, 60 degree phasing shoot from 11010' to 11030'.POOH "**Continued on 9/6/08 WSR *** 9/6/2008 CTU #6 1.75" CT Job Scope Add Perfs *****"* Continued from 9/5/08 WSR "*°*~` ;POOH after #7 Gun Run confirm all shots fired and recover ball. MU RIH w/ # 8 ;gun run 10' x 1.56" HSD PJ1606 charges, 6spf, 60 degree phasing shot from 11000' to 11010', POOH. RIH w/ wt. bar, bi-jars, 1.5" sample bailer. Worked thru 'bridge @ 12143- 12165 and tagged bottom @ 12555. pooh. Recovered full bailer 'of formation sand and other material. RD **"*"*''* Job Complete "`*~~~* FLUIDS PUMPED BBLS 1 diesel 1 Total WELL LOG TRANSMITTAL ProActive Diagnostic Services, Inc. To: State of Alaska AOGCC ;333 W. 7th Street Suite 700 Anchorage, Alaska 99501 RE' Distribution - Final Print(s) The technical data listed below is being submitted herewith. Please acknowledge receipt by returning a signed copy of this transmittal letter to the attention of' Joey Burton / Jeni Thompson ProActive Diagnostic Services, Inc. P. O. Box 1369 Stafford, TX 77497 BP Exploration (Alaska), Inc. Petro-Technical Data Center LB2-1 900 East Benson Blvd. Anchorage, AK 99501 LOG I DIGITAL MYLAR / BLUE LINE REPORT WELL DATE TYPE OR SEPIA PRINT(S} OR CD-ROM FILM BLUELINE Open Hole I I 1 ,, Res. Eval. CH I I 1 4-06a/Q-30 '3-23-03 Mech. CH '" .... ,, Caliper Survey , , ,., Signed' ~ ~*,\ ~L~x "~'~ ,_O_~~_/"X~ Date' Print Name: ProActive Diagnostic Services, Inc., 3 IO K Street Suite 200, Anchorage, AK 99501 Phone:(907) 245-8951 Fax:(907) 245-8952 E-mail: pdsanchorage~memorylog.com Website: www.memorylog.com ..,..,,~ ;~.;:~.,... ~,,:~..~ ....... ,,,~,... ,, AL.ASK,~..~_Q]L AND GAS CONSERVATI, ON OOMMISSIQN__ REPORT O. SUNDRY WELL OPE 1. Operations performed: Operation shutdown __ Stimulate__ Plugging__ .ATIONS Perforate X Pull tubing m Alter casing __ Repair well Other 2. Name of Operator BP Ex~)loration (Alaska) Inc. 3. Address P. O. B°x 196612, Anchora.oe, Alaska 99519-6612 4. Location of well at surface 2579' NSL, 836 WEL, SEC. 8, T11N, R17E, UM At top of productive interval 5146' NSL, 2383' WEL, SEC., 8, T11N, R17E, UM At effective depth 1022' NSL, 3650' WEL, SEC., 8, T11N, R17E, UM At total depth 1022' NSL, 3650' WEL, SEC. 8, T11N, R17E, UM 5. Type of Well: Development __ Exploratory __ Stratigraphic __ Service 6. Datum elevation (DF or KB) KBE = 56' feet 7. Unit or Property name Duck Island Unit/Endicott 8. Well number 4-06A/Q-30 9. Permit number/approval number 96-166 10. APl number 50- 029-21723-01 11. Field/Pool Endicott Field/Endicott Pool 12. Present well condition summary Total depth: measured true vertical Effective depth: measured true vertical 12,585 feet 10, 077 BKB feet 12,585 feet 10,077 BKB feet Plugs (measured) Junk (measured) Casing Structural Conductor Surface Intermediate Production Liner Perforation depth: Length Size Cemented Measured depth True vertical depth BKB BKB 161' 30" Driven 200' 144' 2498' 13-3/8" 4260 c.f. Permafrost 2537' 2479' 1690' 9-5/8" 575 c.f. Class 'G 10759 9746' 5577' 7" & 7-3/4" 476 c.f. and 333 c.f Class 'G' 10834 9806' 2316' 4-1/2" 266 c.f. Class 'G' 10396 '- 12712' 9438'- 10185' measured 10,933- 10,953'; 11,350'- 11445'; 11,890'- 11,910'; 12,100'- 12,115'; 12,240'- 12,275' (OPEN) true vertical 9860'- 9867'; 9970'- 9977? 9974'- 9975'; 10016'- 10021'; 10062'- 10074? (OPEN) Tubing (size, grade, and measured depth) 4-1/2", 12.6#, L-80 @ 10354' Packers and SSSV (type and measured depth) 7-5/8" TIW HBBP Packer@ 10297'; 4-1/2" SSSV Landing Nipple (OTIS) @ 1503' 13. Stimulation or cement squeeze summaw Addpedoration (8/16/98) Inte~als treated (measured) 10,933-10,953'(MD) Treatment description including volumes used and final pressure (see a~ached) 14. Representative Daily Average Production or Injection Data OiI-Bbl Gas-Mcf Water-Bbl Casing Pressure Tubing Pressure Prior to well operation 76 1174 15205 0 586 Subsequent to operation n/a n/a n/a 0 n/a 15. Attachments Copies of Logs and Surveys run __ Daily Report of Well Operations X 16. Status of well classification as: Oil X Gas.__ Suspended Service 17. I hereby certify that the foregoing is true and correct to the best of my knowledge. Signed '! [~.~,/L..~' Title Senior Technical Assistant IV 1'564-5234) Form 10-404 Rev 06/{~./88 Date 11/23/98 SUBMIT IN DUPLICATE& ENDICOTT, ALASKA TO: Endicott Reports Group FROM: M. Kissinger Well Name: 14-06 iA Main Category: Sub Category: Add Perfs Operation Date: 110/31/98 - 11/1198 Objective: To Perforate from 12,936'-12,963' MD. r. Date: SWS: S. Deckert Cost Code: N15406-120 OPERATIONS SUMMARY: 10/31/98: MIRU SWS. RIH with GR/CCL, 20' perf guns, rollers and weight bar. Could not reach desired perf interval. Guns stopping at 10,900, probably due to the severe dogleg. Obtain GR/Jewelry log correlated to Sperry MWD log to allow us to run without GRon next attempt. POOH. RDFN. 11/01/98: MIRU SWS. RIHwith CCL, 10guns, rollers, weight bar. This setup puts the balance point just above the rollers and is short enough to get through doglegs. Successfully perforate 10943-10953 SIWHP increases 210 psi. POOH. Pick up second 10' gun carrier. RIH with same setup. Successfully perforate 10933-10943. POOH. RDMO. ~ Perforated interval 10933 -10953 with 2.5" 31J UJ 17.34" penetration, .29" EH. Initial Well I FWHP lAP 0AP WHT StatusI (psi) (psi) (psi) (° F) II 450 t920 0 180 TIME OPERATION 1530 MIRU SWS. Hold safety meeting, Mike Minogue is Spill Champion. Begin closing choke to S/I well. 1630 Arm 20' gun carrier loaded with 20' of shots, 6 spf, deep penetrating. Slapper Actuated Firing Equipment being utilized. PT lubricator to 2000 psi. 1700 S/I wing. RIH w/toolstring # 1. 1745 LU tie in correlated to LWD GR/Resistivity 11/26/98. LU through jewelry to provide a jewelry log on depth with the LWD log. 1900 Can't get down to desired intervak Try several times stopping around 10900'. Decide to come back tomorrow with 10' guns. It appears that the dogleg severity is too high for 20'gun plus rollers. 2000 POOH. 2100 OOH, POP well, RDFN. 0730 S/I well. MU toolstring #2. A much more aggressive approach. Distance CCL to top shot = 3.5'. 0830 RIH w/toolstring # 2. 0930 LU tie in to GR/JewIry log 10/31/98. This log was run yesterday and correlated to Sperry Sun MWD GR/Resistivity from 11/26/96. 1000 LU Park CCL @ 10939.5' This places top shot @ 10943'. Fire gun. SIWHP increases from 1630 psi to 1840 psi. LU to record proper shot depth. POOH. 1115 OOH. All shot fired. 1130 MU toolstring #3. Same configuration as toolstring #2. Distance CCL to top shot = 3.5'. 1200 RIH w/toolstring #3. 1235 LU tie in to GR/JewIry log 10/31/98. This log was run yesterday and correlated to Sperry Sun MWD GR/Resistivity from 11/26/96. 1245 LU Park CCL @ 10929.5'. This places top shot @ 10933'. Fire gun. Good weight indication. LU to record proper shot depth. POOH. 1345 OOH. All shots fired. Contact Production Control, POP well and have it tested. 1500 RDMO. Final Well I FWHP lAP 0AP WHT Statust (psi) (psi) (psi) (° F) II 450 1920 0 160 I Tool Description Tool String Assembly 1 inches I Length, feet I Comments MH-22 1 3~8" 1.6' Head assembly. Gun Gamma Ray & CCL 1 11/16" 6.4' Using GGR due to poor collar quality on previous logs in this well. Tool Saver 1 11/16" 1.7' Protects GGR during firing. SAFE Firing Adapter 2 7/8" 3.0' Gun Carrier 2 7/8" 20' Loaded from bottom up with 20' of Ultrajet charges, 6spf. Penetration = 20.57", Hole Diameter = .29" Rollers 3 ½" 3' Weight Bar 3" 5' Total = 40.7' Tool String Assemblies 2 & 3 Tool Description OD, inches Length, feet Comments MH-22 1 3/8" 1.6' Head assembly. CCL 1 11/16" 1.25' SAFE Firing Adapter 2.5" 2.0' Gun Carrier 2.5" 10' Loaded with 10' of 31J UJ charges, 6spf. Penetration = 17", Hole Diameter = .29" Rollers 3 ½" 3' Weight Bar 2 1/8" 6' 130 lbs iotal = 23.85' PERMIT DATA AOGCC Individual Well Geological Materials Inventory T DATA PLUS Page: 1 Date: 11/25/98 RUN RECVD 96-166 96-166 96-166 96-166 BHC/SL 96-166 SSTVD 96-166 BH PROF 96-166 AIT 96-166 CN/LDT 96-166 7634 96-166 MWD SRVY ~10796-12175 ~10796-12222 10796-12202 ~10796-12175 ~-~CHL~ ~/~c ~o750.61-12687.o FINAL 12/23/96 FINAL 12/23/96 2-5,7 12/19/96 FINAL 03/14/97 FINAL 03/14/97 FINAL 03/14/97 FINAL 03/14/97 FINAL 03/14/97 1 03/14/97 05/02/97 D~LY WE~,~, oPs R/! / ? / ~/ To !,~./~//!4/ .'~ / ? / ?// Are dry ditch samples required? yes ~d received? yes~ Was the well cored? yes ~.Analysis & description received? ~e~ Are well tests required? yes ~eceived? Well is in compliance In'iti al COMMENTS w Department BP Exploration (Alaska) Inc. 900 East Benson Boulevard P.O. Box 196612 Anchorage, Alaska 99519-6612 (907) 561-5111 HAND DELIVERED January 8, 1998 David Johnston Chairman Alaska Oil and Gas Conservation Commission 3001 Porcupine Drive Anchorage, Alaska 99501-3192 Dear Mr. Johnston: I understand that the following wells: 1-03/P-16, 2-46A/R-10, 4-06A/Q-30, and, 4-34/O-38, are all within the Endicott Participating Area of the Duck Island Unit and currently under confidential file at the AOGCC under the provisions of AS 31.05.035(c). Please consider this letter your authorization to allow Julie Heusser, a contractor to BP Exploration Alaska, Inc., to examine and copy, if necessary, relevant portions of these files on behalf of BPXA and the Working Interest Owners of the Duck Island Unit. If you have any questions or require further assurances, please contact me at 564- 5630. Very Truly Your.s, Daniel~ BPX Endicott Asset Manager STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMMISSION WELL COMPLETION OR RECOMPLETION REPORT AND LOG 1. Status of Well Classification of Service Well [] Oil [] Gas [] Suspended [] Abandoned I--I Service 2. Name of Operator 7. Permit Number BP Exploration (Alaska)Inc. 96-166 3. Address 8. APl Number P.O. Box 196612, Anchorage, Alaska 99519-6612 50-029-21723-01 4. Location of well at surface ~"~;.i~-;-,:.-7~.~ ............ ':~ 9. Unit or Lease Name 2579' NSL, 836' WEL, SEC. 8, T11 N, R17E i .... ~,~?.'.~Ti0~.~ ~ ~-I. OC.~ .... ~' ~ Duck Island Unit/Endicott At top of productive interval /?~Z-?,¢~i iii10. Well Number 5146' NSL, 2383' WEL, SEC. 8, T11 N, R17E 4-06A/Q-30 At total depth ~. i ll. Field and Pool 1022' NSL, 3650' WEL, SEC. 5, T11 N, R17E -' " ~ ~ Endicott Field / Endicott Pool 5. Elevation in feet (indicate KB, DF, etc.) 16. Lease Designation and Serial No. KBE = 56', ADL 047502 12. Date Spudded11/13/96 I 13' Date T'D' Reached I 14' Date C°mp" Susp" °r Aband'l15' Water depth' if °fish°re 16' N°' °f C°mpleti°nsl 1/27/96 12/4/96 N/A MSL One 17. Total Depth (MD+TVD) 18. Plug Back Depth (MD+TVD) 19. Directional Survey 120. Depth where SSSV set 121. Thickness of Permafrost 12686 10230 FT 12585 10189 FT []Yes [--INoI 1503' MDI 1465' (Approx.) 22. Type Electric or Other Logs Run LWD, DIR/FE, MWD, DEN/NEU, AlT, TDL, CNT, GR, BHC Sonic 23. CASING, LINER AND CEMENTING RECORD CASING SETTING DEPTH HOLE SIZE WT. PER FT. GRADE TOP BOTTOM SIZE CEMENTING RECORD AMOUNT PULLED See Attachment 24. Perforations open to Production (MD+TVD of Top and 25. TUBING RECORD Bottom and interval, size and number) SIZE DEPTH SET (MD) PACKER SET (MD) 2-3/4" Gun Diameter, 4 spf 4-1/2", 12.6#, L-80 10354' 10297' MD TVD MD TVD 11350'-11445' 9970'-9977' 11890'-11910' 9974'-9975' 26. AC~D, FRACTURE, CEMENT SQUEEZE, FTC. 12100'-12115' 10016'-10021' DEPTH INTERVAL (MD) AMOUNT & KIND OF MATERIAL USED 12240'-12275' 10062'-10074' Freeze Protect with 35 bbls Diesel 27. PRODUCTION TEST Date First Production I Method of Operation (Flowing, gas lift, etc.) December 7, 1996 I Gas Lift Date of Test Hours Tested PRODUCTION FOR OIL-BBL GAS-MCF WATER-BBL CHOKE SIZE I GAS-OIL RATIO TEST PERIOD I Flow Tubing Casing Pressure iCALCULATED OIL-BBL GAS-MCF WATER-BBL OIL GRAVITY-APl (CORR) Press. 24-HOUR RATE 28. CORE DATA Brief description of lithology, porosity, fractures, apparent dips and presence of oil, gas or.._w, at_er. Submit core chips. / ECEIV D' r,/.~.y 2 199"7 Al~l,t/~t Oil .& Gas Cons. C0mmiss~u, Anchorage Form 10-407 Rev. 07-01-80 Submit In Duplicate 29. Geologic Markers 30. Formation Tests Measured True Vertical Include interval tested, pressure data, all fluids Marker Name Depth Depth recovered and gravity, GOR, and time of each phase. Kekiktuk 10902' 9903' FIV 11813' 9970' Fill 12246' 10064' FII 12390' 10114' 31. List of Attachments Summary of Daily Drilling Reports, Surveys 32. I hereby certify that t~e foregoi~g-i,s true~iand correct to the best of my knowledge Signed . _J :, ~ ,~* Steve Shultz. C~ ~. ¢"-"~¢ - Title Senior Drilling Engineer Date , / 96-~6~ Prepared By Name/Number: Kathy Campoamor, 564-5122 4-06A/Q-30 Well Number Permit No. / Approval No. INSTRUCTIONS GENERAL: This form is designed for submitting a complete and correct well completion report and log on all types of lands and leases in Alaska. ITEM 1: Classification of Service Wells: Gas injection, water injection, steam injection, air injection, salt water disposal, water supply for injection, observation, injection for in-situ combustion. ITEM 5: Indicate which elevation is used as reference (where not otherwise shown) for depth measurements given in other spaces on this form and in any attachments. ITEM 16 AND 24: If this well is completed for separate production from more than one interval (multiple completion), so state in item 16, and in item 24 show the producing intervals for only the interval reported in item 27. Submit a separate form for each additional interval to be separately produced, showing the data pertinent to such interval. ITEM 21: Indicate whether from ground level (GL) or other elevation (DF, KB, etc.). ITEM 23: Attached supplemental records for this well should show the details of any multiple stage cementing and the location of the cementing tool. ITEM 27: Method of Operation: Flowing, Gas Lift, Rod Pump, Hydraulic Pump, Submersible, Water Injection, Gas Injection, Shut-In, Other-explain. ITEM 28'. If no cores taken, indicate 'none'. Form 10-407 Rev. 07-01-80 WELL NAME: 4-06A/Q-30 23.' Attachment - caSing, Liner and Cementing Record Casing Setting Depth Hole Size Wt. Per Ft. Grade Top Bottom Size Cementing Record 30" StructuralDrive .Pipei Surface 161' ........ Driven 13-3/8"68# L-80 Surface 2498' 17-1/2"4260 c.f. Permafrost 9-5/8" 47# NT80S Surface 9030' 12-1/4" 9-5/8" 47# NT95HS 9030' 10720' 12-1/4"575 c.f. Class 'G' 7-5/8" 29.4# NT95HS 5218' 10486' 8-1/2" 333 c.f. Class'G' 7" 29# SM-110 10486' 10795' 8-1/2" 476 c.f. Class 'G' 4-1/2" 12.6# L-80 10357' 12673' 6" 266 c.f. Class 'G' ..... Facility Date/Time 07 Nov 96 08 Nov 96 09 Nov 96 10 Nov 96 11 Nov 96 End SDI Progress Report Well 4-06A/Q-30 Page 1 Rig Doyon 15 Date 30 April 97 08:30-17:00 17:00-18:00 18:00-18:30 18:30-19:30 19:30-20:00 20:00-21:00 21:00-02:00 02:00-06:00 06:00-06:30 06:30-09:30 09:30-10:30 10:30-13:00 13:00-13:30 13:30-14:00 14:00-14:30 14:30-15:00 15:00-15:30 15:30-18:00 18:00-18:30 18:30-19:00 19:00-20:00 20:00-21:00 21:00-05:30 05:30-06:00 06:00-06:30 06:30-07:30 07:30-08:30 08:30-10:30 10:30-17:30 17:30-18:00 18:00-18:30 18:30-19:30 19:30-20:00 20:00-22:30 22:30-23:00 23:00-23:30 23:30-00:00 00:00-03:30 03:30-06:00 06:00-06:30 06:30-11:30 11:30-14:00 14:00-14:30 14:30-17:30 17:30-18:00 18:00-18:30 18:30-19:00 19:00-21:30 21:30-01:30 01:30-03:00 03:00-05:30 05:30-06:00 06:00-06:30 06:30-07:30 Duration 8-1/2 hr lhr 1/2 hr lhr 1/2 hr lhr 5hr 4hr 1/2 hr 3hr lhr 2-1/2 hr 1/2 hr 1/2 hr 1/2 hr 1/2 hr 1/2 hr 2-1/2 hr 1/2 hr 1/2 hr lhr lhr 8-1/2 hr 1/2 hr 1/2 hr lhr lhr 2hr 7hr 1/2 hr 1/2 hr lhr 1/2 hr 2-1/2 hr 1/2 hr 1/2 hr 1/2 hr 3-1/2 hr 2-1/2 hr 1/2 hr 5hr 2-1/2 hr 1/2hr 3hr 1/2 hr 1/2 hr 1/2hr 2-1/2 hr 4hr 1-1/2 hr 2-1/2 hr 1/2 hr 1/2 hr lhr Activity Rig moved 100.00 % Fill pits with Water based mud Held safety meeting Rigged up BOP handling equipment Removed Xmas tree Removed Adapter spool Rigged up All functions Tested All functions Held safety meeting Rig waited · Assessed situation Removed Tubing hanger Circulated at 10404.0 ft Laid down 80.0 ft of Tubing Rigged up sub-surface equipment - Retrievable packer Removed Seal assembly Installed Seal assembly Tested Seal assembly Tested All functions Held safety meeting Installed Wear bushing Rigged down sub-surface equipment - Retrievable packer Rigged up Tubing handling equipment Laid down 10404.0 ft of Tubing Rigged up Drillstring handling equipment Held safety meeting Rigged up Top ram Serviced Top drive Made up BHA no. 1 Singled in drill pipe to 10308.0 ft Serviced Block line Held safety meeting Fished at 10399.0 ft Flow check Pulled out of hole to 945.0 ft Pulled BHA Made up BHA no. 2 Serviced Draw works R.I.H. to 10414.0 ft Milled Permanent packer at 10414.0 ft Held safety meeting Repaired High pressure lines Milled Permanent packer at 10414.0 ft Flow check Pulled out of hole to 958.0 ft Pulled BHA Held safety meeting Made up BHA no. 3 R.I.H. to 10414.0 ft Milled Permanent packer at 10414.0 ft Circulated at 10414.0 ft Pulled out of hole to 967.0 ft Pulled BHA Held safety meeting Made up BHA no. 4 Facility Date/Time 12 Nov 96 13 Nov 96 14 Nov 96 15 Nov 96 End SDI Progress Report Well 4-06A/Q-30 Rig Doyon 15 Page Date 07:30-08:00 08:00-09:00 09:00-10:30 10:30-11:30 11:30-12:30 12:30-16:00 16:00-17:00 17:00-17:30 17:30-18:00 18:00-18:30 18:30-21:00 21:00-23:00 23:00-01:30 01:30-05:00 05:00-05:30 05:30-06:00 06:00-06:30 06:30-11:00 11:00-13:00 13:00-18:00 18:00-18:30 18:30-19:00 19:00-02:30 02:30-03:00 03:00-05:30 05:30-06:00 06:00-06:30 06:30-07:30 07:30-09:30 09:30-10:30 10:30-12:00 12:00-15:30 15:30-17:30 17:30-18:00 18:00-18:30 18:30-20:30 20:30-21:30 21:30-22:00 22:00-00:30 00:30-03:30 03:30-04:00 04:00-06:00 06:00-06:30 06:30-18:00 18:00-18:30 18:30-23:00 23:00-02:30 02:30-03:30 03:30-04:00 04:00-06:00 06:00-06:30 06:30-08:00 08:00-10:00 10:00-14:00 Duration 1/2 hr lhr 1-1/2 hr lhr lhr 3-1/2 hr lhr 1/2 hr 1/2 hr 1/2 hr 2-1/2 hr 2hr 2-1/2 hr 3-1/2 hr 1/2 hr 1/2 hr 1/2 hr 4-1/2 hr 2hr 5hr 1/2hr 1/2 hr 7-1/2 hr 1/2 hr 2-1/2 hr 1/2hr 1/2 hr lhr 2hr lhr 1-1/2 hr 3-1/2 hr 2hr 1/2hr 1/2 hr 2hr lhr 1/2 hr 2-1/2 hr 3hr 1/2 hr 2hr 1/2 hr 11-1/2 hr 1/2hr 4-1/2 hr 3-1/2 hr lhr 1/2 hr 2hr 1/2 hr 1-1/2 hr 2hr 4hr Activity R.I.H. to 3811.0 ft Serviced Block line R.I.H. to 10413.0 ft Fished at 10413.0 ft Circulated at 10467.0 ft Pulled out of hole to 644.0 ft Laid down fish Pulled BHA Made up BHA no. 5 Held safety meeting R.I.H. to 10744.0 ft Drilled cement to 10825.0 ft Circulated at 10825.0 ft Pulled out of hole to 949.0 ft Pulled BHA Rigged up Logging/braided cable equipment Held safety meeting Set downhole equipment (wireline) Made up BHA no. 6 R.I.H. to 10578.0 ft Held safety meeting R.I.H. to 10752.0 ft Milled Casing at 10804.0 ft Flow check Pulled out of hole to 1033.0 ft Pulled BHA Held safety meeting Held drill (Abandonment) R.I.H. to 5750.0 ft Serviced Block line R.I.H. to 10799.0 ft Milled Casing at 10793.0 ft Circulated at 10805.0 ft · Pulled out of hole to 9000.0 ft Held safety meeting Pulled out of hole to 982.0 ft Pulled BHA Circulated at -0.0 ft Made up BHA no. 8 R.I.H. to 10725.0 ft R.I.H. to 10798.0 ft Drilled to 10816.0 ft Held safety meeting Drilled to/10913.0 ft Held safety meeting Drilled t0q~6958.0 ft Pulled out of hole to 1563.0 ft Pulled BHA Retrieved Wear bushing Tested BOP stack Held safety meeting Tested BOP stack Made up BHA no. 9 R.I.H. to 10958.0 ft 2 30 April 97 Facility Date/Time 16 Nov 96 17 Nov 96 18 Nov 96 19 Nov 96 20 Nov 96 21 Nov 96 End SDI Progress Report Well 4-06A/Q-30 Page 3 Rig Doyon 15 Date 30 April 97 14:00-18:00 18:00-18:30 18:30-06:00 06:00-06:30 06:30-15:30 15:30-17:00 17:00-18:00 18:00-18:30 18:30-21:00 21:00-22:00 22:00-01:00 01:00-02:00 02:00-05:00 05:00-06:00 06:00-06:30 06:30-18:00 18:00-18:30 18:30-06:00 06:00-06:30 06:30-07:00 07:00-08:00 08:00-10:30 10:30-11:00 11:00-18:00 18:00-18:30 18:30-19:00 19:00-21:00 21:00-22:00 22:00-00:00 00:00-01:00 01:00-02:30 02:30-03:00 03:00-04:00 04:00-06:00 06:00-06:30 06:30-12:00 12:00-13:00 13:00-14:30 14:30-16:00 16:00-18:30 18:30-00:00 00:00-00:30 00:30-01:30 01:30-02:00 02:00-06:00 06:00-07:00 07:00-07:30 07:30-08:00 08:00-17:30 17:30-21:30 21:30-01:00 01:00-01:30 01:30-03:30 03:30-05:30 Duration 4hr 1/2 hr 11-1/2 hr 1/2 hr 9hr 1-1/2 hr lhr 1/2 hr 2-1/2 hr lhr 3hr lhr 3hr lhr 1/2 hr 11-1/2 hr 1/2 hr 11-1/2 hr 1/2 hr 1/2hr lhr 2-1/2 hr 1/2 hr 7hr 1/2 hr 1/2hr 2hr lhr 2hr lhr 1-1/2 hr 1/2 hr lhr 2hr 1/2 hr 5-1/2 hr lhr 1-1/2 hr 1-1/2 hr 2-1/2 hr 5-1/2 hr 1/2 hr lhr 1/2 hr 4hr lhr 1/2 hr 1/2 hr 9-1/2 hr 4hr 3-1/2 hr 1/2hr 2hr 2hr Activity Drilled to 11036.0 ft Held safety meeting Drilled to 11130.0 ft Held safety meeting Drilled to 11225.0 ft Circulated at 11225.0 ft Pulled out of hole to 9500.0 ft Held safety meeting Pulled out of hole to 1562.0 ft Pulled BHA Made up BHA no. 10 Serviced Block line R.I.H. to 10850.0 ft Logged hole with LWD: DIR/FE from 10850.0 ft to 11225.0 ft Held safety meeting Drilled to 11493.0 ft Held safety meeting Drilled to 11647.0 ft Held safety meeting Drilled to 11654.0 ft Circulated at 11654.0 ft Drilled to 11749.0 ft Circulated at 11749.0 ft Drilled to 11819.0 ft Pulled out of hole to 11503.0 ft Held safety meeting Circulated at 11819.0 ft Pumped out of hole to 10869.0 ft Pulled out of hole to 450.0 ft Pumped out of hole to 8768.0 ft Circulated at 8768.0 ft R.I.H. to 10730.0 ft R.I.H. to 11819.0 ft Circulated at 11819.0 ft Held safety meeting Pumped out of hole to 6624.0 ft Circulated at 6624.0 ft Pumped out of hole to 5224.0 ft Circulated at 5224.0 ft Monitor wellbore pressures Strip into well from 5284.0 ft to 8631.0 ft Monitor wellbore pressures Strip into well from 8631.0 ft to 9204.0 ft Monitor wellbore pressures Circulated at 9204.0 ft Circulated at 9204.0 ft Held safety meeting Flow check Circulated at 10732.0 ft Serviced Annular preventor Tested BOP stack Serviced Annular preventor Circulated at 10727.0 ft R.I.H. to 11209.0 ft Facility Date/Time 22 Nov 96 23 Nov 96 24 Nov 96 25 Nov 96 26 Nov 96 27 Nov 96 End SDI Progress Report Well 4-06A/Q-30 Rig Doyon 15 Page Date Duration Activity 05:30-06:00 06:00-06:30 06:30-07:30 07:30-10:00 10:00-14:30 14:30-17:00 17:00-18:00 18:00-18:30 18:30-19:30 19:30-23:00 23:00-02:30 02:30-03:00 03:00-04:00 04:00-06:00 06:00-06:30 06:30-15:00 15:00-18:00 18:00-18:30 18:30-21:00 21:00-06:00 06:00-06:30 06:30-18:00 18:00-18:30 18:30-19:30 19:30-20:00 20:00-06:00 06:00-06:30 06:30-18:00 18:00-18:30 18:30-19:30 19:30-21:00 21:00-22:30 22:30-23:00 23:00-06:00 06:00-06:30 06:30-08:30 08:30-10:00 10:00-13:30 13:30-15:00 15:00-17:30 17:30-18:30 18:30-22:00 22:00-02:00 02:00-03:30 03:30-04:30 04:30-06:00 06:00-06:30 06:30-12:00 12:00-15:30 15:30-18:00 18:00-18:30 18:30-22:00 22:00-01:00 01:00-05:00 1/2 hr 1/2 hr lhr 2-1/2 hr 4-1/2 hr 2-1/2 hr lhr 1/2 hr lhr 3-1/2 hr 3-1/2 hr 1/2 hr lhr 2hr 1/2 hr 8-1/2 hr 3hr 1/2hr 2-1/2 hr 9hr 1/2 hr 11-1/2 hr 1/2 hr lhr 1/2 hr 10hr 1/2 hr 11-1/2 hr 1/2hr lhr 1-1/2 hr 1-1/2 hr 1/2 hr 7hr 1/2 hr 2hr 1-1/2 hr 3-1/2 hr 1-1/2 hr 2-1/2 hr lhr 3-1/2 hr 4hr 1-1/2 hr lhr 1-1/2 hr 1/2hr 5-1/2 hr 3-1/2 hr 2-1/2 hr 1/2 hr 3-1/2 hr 3hr 4hr Circulated at 11209.0 ft Held safety meeting Washed to 11819.0 ft Circulated at 11819.0 ft Pulled out of hole to 2617.0 ft Pulled BHA Made up BHA no. 11 Held safety meeting Serviced Block line Made up BHA no. 11 R.I.H. to 10728.0 ft R.I.H. to 11214.0 ft R.I.H. to 11819.0 ft Drilled to 11830.0 ft Held safety meeting Drilled to 11867.0 ft Circulated at 11867.0 ft Held safety meeting Circulated at 11867.0 ft Drilled to 11925.0 ft Held safety meeting Drilled to 11972.0 ft Held safety meeting Pulled out of hole to 11497.0 ft R.I.H. to 11972.0 ft Drilled to 12054.0 ft Held safety meeting Drilled to 12242.0 ft Held safety meeting Drilled to 12257.0 ft Circulated at 12257.0 ft Pulled out of hole to 11497.0 ft R.I.H. to 12257.0 ft Drilled to 12415.0 ft Held safety meeting Drilled to 12477.0 ft Circulated at 12477.0 ft Pulled out of hole to 10442.0 ft Rest hole at 10442.0 ft Circulated at 10442.0 ft R.I.H. to 12477.0 ft Circulated at 12477.0 ft Pulled out of hole to 3377.0 ft Pulled BHA Downloaded MWD tool Made up BHA no. 12 Held safety meeting R.I.H. to 10930.0 ft Pulled out of hole to 3861.0 ft Pulled BHA Held safety meeting Made up BHA no. 12 R.I.H. to 10840.0 ft Washed to 12477.0 ft 4 30 April 97 Facility Date/Time 28 Nov 96 29 Nov 96 30 Nov 96 01 Dec 96 End SDI Progress Report Well 4-06A/Q-30 Page 5 Rig Doyon 15 Date 30 April 97 05:00-06:00 06:00-06:30 06:30-17:00 17:00-18:00 18:00-18:30 18:30-19:00 19:00-19:15 19:15-20:30 20:30-21:00 21:00-23:30 23:30-02:00 02:00-02:30 02:30-04:00 04:00-06:00 06:00-06:30 06:30-08:00 08:00-09:00 09:00-01:00 01:00-02:00 02:00-02:30 02:30-05:30 05:30-06:00 06:00-06:30 06:30-10:30 10:30-14:30 14:30-18:00 18:00-18:30 18:30-19:30 19:30-00:30 00:30-01:30 01:30-02:00 02:00-02:30 02:30-06:00 06:00-06:30 06:30-07:00 07:00-11:00 11:00-14:00 14:00-14:15 14:15-14:30 14:30-15:00 15:00-15:30 15:30-16:30 16:30-20:00 20:00-20:30 20:30-21:00 21:00-00:00 00:00-03:00 03:00-04:00 04:00-06:00 06:00-06:30 06:30-07:30 07:30-08:00 08:00-11:30 11:30-13:00 Duration lhr 1/2 hr 10-1/2 hr lhr 1/2 hr 1/2 hr 1/4 hr 1-1/4 hr 1/2 hr 2-1/2 hr 2-1/2 hr 1/2 hr 1-1/2 hr 2hr 1/2hr 1-1/2 hr lhr 16hr lhr 1/2 hr 3hr 1/2 hr 1/2 hr 4hr 4hr 3-1/2 hr 1/2 hr lhr 5hr lhr 1/2 hr 1/2 hr 3-1/2 hr 1/2 hr 1/2 hr 4hr 3hr 1/4 hr 1/4 hr 1/2 hr 1/2 hr lhr 3-1/2 hr 1/2 hr 1/2 hr 3hr 3hr lhr 2hr 1/2 hr lhr 1/2 hr 3-1/2 hr 1-1/2 hr Activity Drilled to 12505.0 ft Held safety meeting Drilled to 12686.0 ft Circulated at 12686.0 ft Held safety meeting Circulated at 12686.0 ft Flow check Pulled out of hole to 10486.0 ft Flow check Pulled out of hole to 3858.0 ft Pulled BHA Held safety meeting Rigged up sub-surface equipment - Formation logs Conducted electric cable operations Held safety meeting Conducted electric cable operations Serviced Block line Conducted electric cable operations Rigged up sub-surface equipment - Formation logs Held safety meeting Tested All functions Installed Wear bushing Held safety meeting R.I.H. to 12495.0 ft Reamed to 12686.0 ft Circulated at 12686.0 ft Held safety meeting Circulated at 12686.0 ft Pulled out of hole to 300.0 ft Pulled BHA Rigged up Casing handling equipment Held safety meeting Ran Casing to 1900.0 ft (4-1/2in OD) Held safety meeting Rigged up sub-surface equipment - Liner hanger Ran Casing on landing string to 12686.0 ft Circulated at 12686.0 ft Pumped 60.000 bbl spacers - volume (null) Mixed and pumped slurry - 48.000 bbl Displaced slurry - 104.000 bbl Set Liner hanger at 10370.0 ft with 3500.0 psi Reverse circulated at 10356.0 ft Retrieved Drillpipe landing string Rigged down sub-surface equipment - Liner hanger Held safety meeting Made up BHA no. 9 R.I.H. to 10200.0 ft Serviced Block line R.I.H. to 12585.0 ft Held safety meeting Circulated at 12586.0 ft Tested Casing - Via string Circulated at 12586.0 ft Serviced Mud shakers Facility Date/Time 02 Dec 96 03 Dec 96 04 Dec 96 End SDI Progress Report Well 4-06A/Q-30 Page 6 Rig Doyon 15 Date 30 April 97 13:00-18:00 18:00-18:30 18:30-20:00 20:00-00:00 00:00-02:00 02:00-02:30 02:30-04:00 04:00-05:30 05:30-06:00 06:00-06:30 06:30-11:30 11:30-12:00 12:00-12:30 12:30-13:00 13:00-13:30 13:30-14:00 14:00-14:30 14:30-15:30 15:30-16:30 16:30-16:45 16:45-18:00 18:00-18:30 18:30-19:00 19:00-19:30 19:30-00:30 00:30-01:00 01:00-03:00 03:00-03:30 03:30-06:00 06:00-06:30 06:30-09:00 09:00-10:00 10:00-11:00 11:00-18:00 18:00-18:30 18:30-00:30 00:30-03:30 03:30-04:00 04:00-04:15 04:15-04:45 04:45-05:00 05:00-06:00 06:00-06:30 06:30-08:00 08:00-08:30 08:30-09:30 09:30-10:00 10:00-11:00 11:00-12:00 12:00-15:00 15:00-16:00 Duration 5hr 1/2 hr 1-1/2 hr 4hr 2hr 1/2 hr 1-1/2 hr 1-1/2 hr 1/2 hr 1/2 hr 5hr 1/2 hr 1/2 hr 1/2 hr 1/2 hr 1/2 hr 1/2 hr lhr lhr 1/4 hr 1-1/4 hr 1/2 hr 1/2 hr 1/2 hr 5hr 1/2 hr 2hr 1/2hr 2-1/2 hr 1/2 hr 2-1/2 hr lhr lhr 7hr 1/2 hr 6hr 3hr 1/2 hr 1/4 hr 1/2 hr 1/4 hr lhr 1/2 hr 1-1/2 hr 1/2 hr lhr 1/2 hr lhr lhr 3hr lhr Activity Filter Brine Held safety meeting Repaired Kelly/top drive hose Pulled out of hole to 2248.0 ft Pulled BHA Held safety meeting Rigged up sub-surface equipment - TCP Ran Drillpipe in stands to 1820.0 ft Rigged up sub-surface equipment - Retrievable packer Held safety meeting Ran Drillpipe in stands to 12593.0 ft Pulled out of hole to 12275.0 ft Set packer at 9503.0 ft with 0.0 psi Rigged up High pressure lines Held safety meeting Tested High pressure lines Perforated from 11350.0 ft to 12275.0 ft Reverse circulated at 9511.0 ft Bullhead well Flow check Circulated at 9511.0 ft Held safety meeting Rigged down High pressure lines Flow check Laid down 9485.0 ft of Drillpipe Rigged down sub-surface equipment - DST equipment Laid down 1820.0 ft of Drillpipe Held safety meeting Rigged down sub-surface equipment - TCP Held safety meeting Laid out 3-1/2in drill pipe from derrick Removed Wear bushing Rigged up Tubing handling equipment Ran Tubing to 7000.0 ft (4-1/2in OD) Held safety meeting Ran Tubing to 10354.0 ft (4-1/2in OD) Circulated at 10354.0 ft Space out tubulars Set packer at 10297.0 ft with 4000.0 psi Tested Tubing Installed Hanger plug Rigged down All functions Held safety meeting Rigged down All functions Installed Adapter spool Installed Xmas tree Tested All tree valves Removed Hanger plug Tested Packer - permanent tubing conveyed - Via annulus Freeze protect well - 35.000 bbl of Diesel Installed Hanger plug S?~-,RY-SUN DRILLING SERVICES ANCHORAGE ALASKA PAGE 1 SHARED SERVICES DRILLING Endicott / 4-06A/Q-30 500292172301 NORTH SLOPE BOROUGH COMPUTATION DATE: 12/11/96 DATE OF SURVEY: 112796 MWD SURVEY JOB NUMBER: AK-MW-60168 KELLY BUSHING ELEV. = 56.00 FT. OPERATOR: BP EXPLORATION TRUE SUB-SEA MEASD VERTICAL VERTICAL DEPTH DEPTH DEPTH COURS INCLN DG MN COURSE DLS TOTAL DIRECTION RECTANGULAR COORDINATES DEGREES DG/100 NORTH/SOUTH EAST/WEST VERT. SECT. 10750.61 9795.81 9739.81 10787.00 9825.49 9769.49 10808.04 9842.41 9786.41 10838.78 9865.51 9809.51 10868.45 9885.02 9829.02 35 22 N 10.50 W .00 35 17 N 9.73 W 1.24 37 42 N 13.70 W 16.00 44 47 N 18.33 W 25.13 52 54 N 21.90 W 28.76 2467.65N 1514.96W 2488.37N 1518.66W 2500.62N 1521.21W 2520.06N 1526.85W 2541.00N 1534.56W 2753.97 2770.23 2780.12 2797.03 2816.48 10901.92 9903.05 9847.05 10935.60 9917.16 9861.16 10963.73 9926.60 9870.60 10997.19 9936.05 9880.05 11029.48 9943.04 9887.04 61 54 N 27.90 W 30.82 68 35 N 35.50 W 28.54 72 11 N 42.40 W 26.41 75 0 N 47.10 W 15.86 80 0 N 47.50 W 15.53 2566.50N 1546.48W 2592.45N 1562.58W 2613.03N 1579.23W 2635.81N 1601.83W 2657.18N 1624.99W 2842.10 2871.19 2897.22 2929.19 2960.68 11060.05 9946.82 9890.82 11093.68 9948.78 9892.78 11123.29 9950.36 9894.36 11153.84 9952.35 9896.35 11208.72 9956.71 9900.71 85 48 N 47.20 W 19.00 87 30 N 47.30 W 5.06 86 24 N 50.40 W 11.09 86 5 N 50.40 W .98 84 47 N 52.30 W 4.20 2677.73N 1647.29W 2700.51N 1671.94W 2719.97N 1694.20W 2739.40N 1717.69W 2773.56N 1760.41W 2990.98 3024.52 3054.08 3084.56 3139.23 11236.94 9959.32 9903.32 11271.58 9962.55 9906.55 11303.30 9965.54 9909.54 11332.93 9968.50 9912.50 11428.63 9976.63 9920.63 84 35 N 53.74 W 5.13 84 41 N 54.15 W 1.21 84 28 N 53.16 W 3.19 84 4 N 55.72 W 8.70 86 10 N 57.61 W 2.95 2790.46N 1782.85W 2810.76N 1810.74W 2829.47N 1836.17W 2846.62N 1860.15W 2899.01N 1939.81W 3167.28 3201.66 3233.16 3262.53 3357.14 11522.06 9981.34 9925.34 11589.50 9980.31 9924.31 11618.77 9978.33 9922.33 11654.55 9975.95 9919.95 11684.30 9974.51 9918.51 88 1 N 57.45 W 1.99 93 43 N 57.28 W 8.46 94 2 N 56.39 W 3.21 93 34 N 55.66 W 2.42 92 0 N 54.90 W 5.86 2949.10N 2018.52W 2985.45N 2075.29W 3001.42N 2099.73N 3021.37N 2129.34W 3038.30N 2153.76W 3449.53 3516.31 3545.27 3580.75 3610.31 11713.65 9973.48 9917.48 11752.08 9972.13 9916.13 11777.49 9971.12 9915.12 11808.51 9970.30 9914.30 11841.88 9970.56 9914.56 92 0 N 55.05 W .51 92 2 N 53.90 W 2.99 92 30 N 55.83 W 7.80 90 31 N 54.38 W 7.91 88 34 N 52.35 W 8.41 3055.13N 2177.78W 3077.45N 2209.03W 3092.06N 2229.80W 3109.79N 2255.22W 3129.70N 2282.00W 3639.51 3677.77 3703.05 3733.90 3767.20 11876.02 9972.31 9916.31 11906.01 9974.99 9918.99 11936.86 9978.37 9922.37 11968.58 9982.78 9926.78 11999.23 9988.51 9932.51 85 33 N 50.89 W 9.82 84 11 N 47.99 W 10.65 83 12 N 47.09 W 4.32 80 48 N 45.99 W 8.31 77 38 N 42.99 W 14.12 3150.87N 2308.72W 3170.29N 2331.41W 3190.99N 2354.03W 3212.59N 2376.83W 3234.06N 2397.93W 3801.26 3831.13 3861.77 3893.14 3923.13 ORIGINAL -' PAGE 2 S IRY-SUN DRILLING SERVICES Ai~CHOR3~GE ALASICA SHARED SERVICES DRILLING Endicott / 4-06A/Q-30 500292172301 NORTH SLOPE BOROUGH COMPUTATION DATE: 12/11/96 DATE OF SURVEY: 112796 MWD SURVEY JOB NUMBER: AK-MW-60168 KELLY BUSHING ELEV. = 56.00 FT. OPERATOR: BP EXPLORATION TRUE SUB-SEA MEASD VERTICAL VERTICAL DEPTH DEPTH DEPTH COURS INCLN DG ~MN COURSE DLS DIRECTION DEGREES DG/10 TOTAL RECTANGULAR COORDINATES 0 NORTH/SOUTH EAST/WEST VERT. SECT. 12034.12 9996.79 12065.92 10005.79 12095.03 10014.78 12130.33 10025.87 12161.73 10035.87 9940.79 74 54 9949.79 72 10 9958.78 71 50 9969.87 71 34 9979.87 71 16 N 41.48 W 8. N 40.08 W 9. N 38.76 W N 38.69 W . N 40.91 W 6. 88 3259.15N 2420.71W 3956.74 57 3282.24N 2440.63W 3986.88 47 3303.63N 2458.21W 4014.13 79 3329.77N 2479.18W 4047.05 76 3352.64N 2498.23W 4076.38 12192.24 10045.83 9989.83 70 36 12289.02 10078.46 10022.46 69 58 12385.28 10112.15 10056.15 69 3 12479.97 10147.30 10091.30 67 22 12574.77 10184.57 10128.57 66 19 N 39.97 W 3. N 41.04 W 1. N 41.72 W 1. N 38.00 W 4. N 40.95 W 3. 65 3374.58N 2516.93W 4104.86 23 3443.86N 2576.11W 4194.83 17 3511.52N 2635.71W 4284.09 05 3578.98N 2692.06W 4370.74 07 3646.26N 2747.46W 4456.55 12623.76 10204.58 10148.58 65 28 N 40.78 W 1.76 12687.00 10230.84 10174.84 65 28 N 40.78 W .03 3680.08N 2776.72W 4500.76 3723.64N 2814.30W 4557.62 THE CALCULATION PROCEDURES ARE BASED ON THE USE OF THREE-DIMENSION MINIMUM CURVATURE METHOD. HORIZONTAL DISPLACEMENT = 4667.53 FEET AT NORTH 37 DEG. 4 MIN. WEST AT MD = 12687 VERTICAL SECTION RELATIVE TO WELL HEAD VERTICAL SECTION COMPUTED ALONG 310.46 DEG. TIE-IN SURVEY AT 10,750.61' MD WINDOW POINT AT 10,787.00' MD PROJECTED SURVEY AT 12,687.00' MD SP-~'RY-SUN DRILLING SERVICES ANCHORAGE ALASKA PAGE 3 SHARED SERVICES DRILLING Endicott / 4-06A/Q-30 500292172301 NORTH SLOPE BOROUGH COMPUTATION DATE: 12/11/96 DATE OF SURVEY: 112796 JOB NUMBER: AK-MW-60168 KELLY BUSHING ELEV. = 56.00 FT. OPERATOR: BP EXPLORATION INTERPOLATED VALUES FOR EVEN 1000 FEET OF MEASURED DEPTH TRUE SUB-SEA MEASD VERTICAL VERTICAL DEPTH DEPTH DEPTH TOTAL RECTANGUL~ COORDINATES MD-TVD VERTICAL NORTH/SOUTH EAST/WEST DIFFERENCE CORRECTION 10750.61 9795.81 9739.81 11750.61 9972.18 9916.18 12687.00 10230.84 10174.84 2467.65 N 1514.96 W 954.80 3076.58 N 2207.85 W 1778.43 823.63 3723.64 N 2814.30 W 2456.16 677.73 THE CALCULATION PROCEDURES i~qE BASED ON THE USE OF THREE-DIMENSION MINIMUM CURVATURE METHOD. ST RY-SUN DRILLING SERVICES ANCHORAGE ALASKA PAGE SHARED SERVICES DRILLING Endicott / 4-06A/Q-30 500292172301 NORTH SLOPE BOROUGH COMPUTATION DATE: 12/11/96 DATE OF SURVEY: 112796 JOB NUMBER: AK-MW-60168 KELLY BUSHING ELEV. = 56.00 OPEP_ATOR: BP EXPLORATION FT. INTERPOLATED VALUES FOR EVEN 100 FEET OF SUB-SEA DEPTH TRUE SUB-SEA MEASD VERTICAL VERTICAL DEPTH DEPTH DEPTH TOTAL RECTANGULAR COORDINATES NORTH/SOUTH EAST/WEST MD-TVD DIFFERENCE VERTICAL CORRECTION 10750.61 9795.81 9739.81 2467.65 N 1514.96 W 954.80 10825.84 9856.00 9800.00 2511.69 N 1524.28 W 969.84 11200.87 9956.00 9900.00 2768.78 N 1754.22 W 1244.87 12222.87 10056.00 10000.00 3396.73 N 2535.49 W 2166.87 15.04 275.02 922.00 12502.45 10156.00 10100.00 3595.22 N 2704.94 W 2346.45 12687.00 10230.84 10174.84 3723.64 N 2814.30 W 2456.16 179.58 109.71 THE CALCULATION PROCEDURES USE A LINEAR INTERPOLATION BETWEEN THE NEAREST 20 FOOT MD (FROM MINIMUM CURVATURE) POINTS Schlumberger - GeoQuest A Division of Schlumberger Technologies Corporation 500 W. International Airport Road Anchorage, Alaska 99518 - 1199 (907) 562-7669 (Bus.) (907) 563-3309 (Fax) TO: March 13, 1997 BP Exploration (Alaska) Inc. Petrotectnical Data Center MB3-3 900 E. Benson Blvd. Anchorage, Alaska 99519-6612 The following data of the PEX-AIT,CNI_/LDT,SSTVD,BHC & BOREHOLE PROFILE for well 4-06A/Q-30, Job # 96387, was sent to: BP Exploration (Alaska) Inc. Petrotechnical Data Center, MB3-3 900 E. Benson Blvd. Anchorage, AK 99519-6612 1 OH LIS Tape 1 Depth Shift Display 2 Blueline each 1 Film each State of Alaska Alaska Oil & Gas Conservation Attn: Lori Taylor 3001 Porcupine Drive Anchorage, AK 99501 1 OH LIS Tape 1 Blueline each 1 RFolded Sepia each ARCO Alaska, Inc. Dede Schwartz, ATO-1336 Anchorage, AK 99510-0360 1 OH LIS Tape I RRolled Sepia each Exxon Company U.S.A. Alaska Interest Organization Attn: Susan Nisbet 800 Bell Street, EB3083 Houston, TX 77002-7420 1 OH LIS Tape 1 Blueline each 1 RFolded Sepia each Certified Mail # Z 777 937 543 UNOCAL Attn: Debra Childers 909 W.9th Ave. Anchorage, AK 99519-0247 1 OH LIS Tape 1 Blueline each 1 RFolded Sepia each Amoco Production Company Attn: Jill Kristan 1670 Broadway Denver, CO 80201 1 OH LIS Tape 1 Blueline each 1 RFolded Sepia each Certified Mail #Z 777 937 542 PLEASE ACKNOWLEDGE RECEIPT BY SIGNING AND RETURNING ONE COPY EACH TO: BP Exploration (Alaska) Inc. Petrotectnical Data Center MB3-3 900 E. Benson Blvd. Anchorage, Alaska 99519-6612 Date Delivered: Schlumberger GeoQuest 500 W. International Airport Road Anchorage, Alaska 99618-1199 0 I:t I I_1_ I I~J G S E PIL/I r" E S WEIJ, LOG TRANSMI'IWAL To: State of Alaska Alaska Oil and Gas Conservation Comm. Attn.: Howard Okland 3001 Porcupine Drive Anchorage, Alaska 99501 December 20, 1996 RE: MWD Formation Evaluation Logs 4-06A/Q-30 AK-MW-60168 The technical data listed below is being submitted herewith. Please acknowledge receipt by returning a signed copy of this of this transmittal letter to the attention of.' Jan Gal~ Sperry-Sun Drilling Services, 5631 Silverado Way, #G, Anchorage, AK 99518 2"x 5" MD Resistivity and Gamma Ray Logs: 50-029-21723-01 2" x 5" TVD Resistivity and Cramma Ray Logs: 50-029-21723-01 1 Blueline 1 Rev Folded Sepia 1 Blueline 1 Rev Folded Sepia 5631 Silverado Way, Suite G · Anchorage, Alaska 99518 · (9.07) 563-3256 · Fax (907) 563-7252 A Dresser Industries, Inc. Company ri IR I I_1_ I IM G S I=: IR ~./I !-- I= S WELL LOG TRANSMTIWAL To: State of Alaska Alaska Oil and Gas Conservation Comm. Atm.: Howard Okland 3001 Porcupine Dr. Anchorage, Alaska 99501 c~ ~ .~ RE: MWD Formation Evaluation Logs - 4-06A/Q-30 AK-MW-60168 December 18, 1996 The technical data listed below is being submitted herewith. Please acknowledge receipt by returning a signed copy of this transmittal letter to the attention off Jun Galvin, Sperry-Sun Drilling Services, 5631 Silverado Way, #G, Anchorage, AK 99518 1 LDWG formatted LIS tape with verification listing. APl#: 50-029-21723-01 5631 Silverado Way, Suite G · Anchorage, Alaska 99518 · (9.07) 563-3256 · Fax (907) 563-7252 A Dresser Industries, Ino. Company MEMORANDUM TO: David John, Chairman ~" State of Alaska Alaska Oil and Gas Conservation Commission DATE: November 8, 1996 THRU: Blair Wondzeli, P. I. Supervisor Petroleum Inspector FILE NO: ALHIKHDD.doc BOPE Test - Doyon 15 DIU - Well 4-06A/Q30 PTD # 96-0166 Friday, November 8, 1996: I received a call from Doyon rig 15 at 1:20 AM informing me that they would be ready to test in 2 hours. I arrived at the rig at 2:45 AM and stoodby for test to begin. The equipment would not hold pressure and after searching for the problem for 3 hours it was discovered that a BPV was installed in the tubing instead of a 2 way check valve. It was decided to hang the tubing off on a "storm packer" and change the pack-off in the well head before testing. I departed the location at 9:00 AM. At 2:00 PM I was called back to the rig and the test began at 3:00 PM. As the attached AOGCC BOPE Test Report shows/the test of the BOPE equipment went smoothly with no failures. The location was clean and orderly. The dg was clean and all other equipment seemed to be in good working order. Summary: I witnessed the satisfactory BOPE test on Doyon rig 15 - test time 3.5 hours - no failures. Attachment: ALHIKHDD.XLS X Unclassified Confidential (Unclassified if doc. removed ) Confidential STATE OF ALASKA OIL AND GAS CONSERVATION COMMISSION BOPE Test Report OPERATION: Drlg: X Workover: Drlg Contractor: DOYON Operator: BPX Well Name: DIU SDI 4-06A/Q300-38 Casing Size: g 5/8" Set @ Test: Initial X Weekly Rig No. 15 PTD # Rep.: Rig Rep.: 10,759' Location: Sec. Other 96-0166 DATE: 11/8/96 Rig Ph.# 059-6770 / 72 JAMES CARLILE JOHN WELCH 8 T. 11N R. 17E Meddian Umiat MISC. INSPECTIONS: Location Gen.: OK Well Sign OK Housekeeping: OK (Gen) Drl. Rig OK PTD On Location Yes ~' Hazard Sec. Yes Standing Order Posted Yes ~ BOP STACK: Annular Preventer Pipe Rams Lower Pipe Rams Blind Rams Choke Ln. Valves HCR Valves Kill Line Valves Check Valve Quan. Test Press. I 300/3,000 I 500/5,000 I 500/5,000 1 500/5,000 I 500/5,000 2 500/5,000 1 500/5,000 N/A P/F P P P P P P P MUD SYSTEM: Visual Alarm Tdp Tank OK OK Pit Level Indicators OK OK Flow Indicator OK OK Meth Gas Detector OK OK H2S Gas Detector OK OK FLOOR SAFETY VALVES: Upper Kelly / IBOP Lower Kelly / IBOP Ball Type Inside BOP Test Quan. Pressure P/F 1 500/5,000 P 500/5,000 P 500/5,000 P 500/5,000 P CHOKE MANIFOLD: No. Valves 17 No. Flanges Manual Chokes Hydraulic Chokes 1 I 500/5,000 1 Test Pressure P/F 500/5,000 P P Funclioned P Functioned P ACCUMULATOR SYSTEM: System Pressure Pressure After Closure 200 psi Attained After Closure System Pressure Attained Blind Switch Covers: Master: Nitgn. Bti's: 4 @ 2.500 3,000 I P 1,500 P min~es 35 sec. minutes 15 sec, Yes Remo~: Yes Psig. Number of Failures: 0 ,Test Time: 3.5 Hours. Number of valves tested 23 Repair or Replacement of Failed Equipment will be made within days. Notify the Inspector and follow with Written or Faxed verification to the AOGCC Commission Office at: Fax No. 276-7542 Inspector North Slope Pager No. 659-3607 or 3687 If your call is not returned by the inspector within 12 hours please contact the P. I. Supervisor at 279-1433 REMARKS: Rig in good condi~on, good test. Distribution: orig-Well File c - OperJRig c- Database c - Trip Rpt File c- Inspector STATE WITNESS REQUIRED? YES X NO 24 HOUR NOTICE GIVEN YES X NO Waived By: W'~nessed By: BOBBY D. FOSTER F1-021L (Rev. 12/94) ALHIKHDD.XLS (~ALASKA~ ea r'e d rvioes rilling BP Exploration / Arco Date: To: October 14, 1996 Alaska Oil & Gas Conservation Commission From: Kathy Campoamor Technical Assistant Subject: Well name change, Permit #96-166 APl # 50-029-21723-01 Enclosed is a revised Permit To Drill (10-401) for 4-06A/Q-32, which was approved October 11, 1996 (Permit #96-166, APl #50-029-21723-01). The only change to this revision is the well name. BP-Endicott has implemented a new well naming 'criteria, which will change well number 4-06A/Q-32 to 4-06A/Q-30. Shared Services Drilling has worked closely with the AOGCC on this new well naming principle. I apologize for any inconvenience this may cause. Thank you for your assistance in this matter. Kathy Campoamor /klc RECEIVED OCT 1 5 1996 tN~ 011 & Gas Cons. Comm~smon Anchorage TONY KNOWLE$, GOVERNOR ALAS~ OIL AND GAS CONSERVATION COMMISSION 3001 PORCUPINE DRIVE ANCHORAGE, ALASKA 99501-3192 PHONE: (907) 279-1433 FAX: (907) 276-7542 October 11, 1996 Steve Shultz Senior Drilling Engineer BP Exploration (Alaska), Inc. P O Box 196612 Anchorage, AK 99519-6612 Re: Duck Island 4-06A/Q-30 BP Exploration (Alaska), Inc. Permit No.96-166 2579?,,1SL, 836'WEL, SEC 08, T1 IN, R17E UM 866WSL, 3522'WEL, SEC 05, T1 IN, R17E UM Dear Mr. Shultz: Enclosed is the approved application for permit to redrill the above referenced well. The permit to redrill does not exempt you from obtaining additional permits required by law from other governmental agencies, and does not authorize conducting drilling operations until all other required permitting determinations are made. Blowout prevention equipment (BOPE) must be tested in accordance with 20 AAC 25 035. Sufficient notice (approximately 24 hours) must be given to allow a representative of the Commission to witness a test of BOPE installed prior to drilling new hole. Notice may be given by contacting the Commission )etroleum field inspector on the North Slope pager at 659-3607. David W. Johnston Chairman '~_,~ BY ORDER OF THE COMMISSION dlffEnclosures CC: Department ofFish & Game, Habitat Section w/o encl. Department of Environmental Conservation w/o encl. STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMMISSION PERMIT TO DRILL 20 AAC 25.005 [] Drill [] Redrill 1 lb. Type of well [] Exploratory [] Stratigraphic Test [] Development Oil la. Type of work [] Re-Entry [] Deepen~ [] Service [] Development Gas [] Single Zone [] Multiple Zone 2. Name of Operator 5. Datum Elevation (DF or KB) 10. Field and Pool BP Exploration (Alaska) Inc. Plan RTE - 56' Endicott Field / Endicott Pool 3. Address 6. Property Designation P.O. Box 196612, Anchorage, Alaska 99519-6612 ADL 047502 4. Location of well at surface 7. Unit or Property Name 11. Type Bond (See 20 AAC 25.025) 2579' NSL, 836' WEL, SEC. 8, T11N, R17E Duck Island At top of productive interval 8. Well Number .~O Number 2S100302630-277 583' NSL, 3192' WEL, SEC. 5, T11N, R17E 4-06NQ--3~ ~r'~ At total depth 9. Approximate spud date Amount $200,000.00 866' NSL, 3522' WEL, SEC. 5, T11 N, R17E 10/15/96 12. Distance to nearest property line113. Distance to nearest well 14. Number of acres in property 15. Proposed depth (MD and TVD) ADL 047503, 3522'I No Close Approach 2560 12554' MD / 10331' TVD 16. To be completed for deviated wells 17. Anticipated pressure {see 20 AAC 25.035 (e)(2)} KickOff Depth 10795' Maximum Hole Angle 85.71 o Maximum surface 4219 psig, At total depth (TVD) 9810' / 5200 psig 18. Casing Program Setting Depth Size Specifications Top Bottom Quantib/of Cement Hole Casing Weight Grade Coupling Length MD TVD MD TVD (include stage data) 6" 4-1/2" 12.6# L-80 IBM 2054' 10500' 9590' 12554' 10331' 214 sx Class 'G' 19. To be completed for Redrill, Re-entry, and Deepen Operations. Present well condition summary Total depth: measured feet Plugs (measured) true vertical feet Effective depth: measured feet Junk (measured) true vertical feet Casing Length Size Cemented M D TVD Structural Conductor Surface Intermediate Production Liner Perforation depth: measured A~3S~a 0~./& P~3s Corls. true vertical 20. Attachments [] Filing Fee [] Property Plat [] BOP Sketch [] Diverter Sketch [] Ddlling Program [] Drilling Fluid Program [] Time vs Depth Pict [] Refraction Analysis [] Seabed Report [] 20 AAC 25.050 Requirements Contact Engineer Name/Number: Chris West, 564-5089 Prepared By Name/Number: Kathy Campoamor, 564-5122 21.1Signedhereby certify that the fo~egoing~_~ is true and cj;Trrect to the best of my knowledge SteveShultz //(.~/,~/,.¢.,,,"t J /,~/.'*~ Title Senior Drilling Engineer Date r._~r"-- '~ Commission Use Only Permit Number t APINumber I . ApprovalDaJ, e Seecoverletter ?E 50- - 2_ I a -I0~1/ - ~ & for other requirements Conditions of Approval: Samples Required [] Yes ~ No Mud Log Required [] Yes ,,~ No Hydrogen Sulfide Measures J~['Yes [] No Directional Survey Required ,~ Yes [] No Required Working Pressure for BOPE [] 2M; []3M; ~ 5M; [] 10M; [] 15M Other; riglnal Signed i3y by order of Approved By n~,,,;,4 ~ l,~-~- Commissioner the commission Date Form 10-401 Rev. 12-0DJ9-~ Submit In Triplicate I Well Name: 14-06A/Q-32 I Well Plan Summary I Type of Well (producer or injector): I Producerl Surface Location: 2578 FSL 836 FEL S08 T11N R17E UM 5067 FSL 2347 FEL S08 T11N R17E UM Tie in survey Location- Target Location' 583 FSL 3192 FEL S05 T11N R17E UM Bottom Hole Location' 866 FSL 3522 FEL S05 T11N R17E UM I AFE Number' 1727006 Estimated Start J 10/15/96 Date: t I Rig: I DOYON 15 Operating days to drill 118 and complete: I I MD. 112554 I ITVD' 110331 I I KBE: 156 I IWell Design (conventional, slimhole, etc.): IULTRA SLIMHOLE HORIZONTAL Formation Markers Horizontal Well Bore: Formation Tops M D TVD RESERVOIR PRESSURE (ss) UPPER SV SHALE 3250 SURFACE CASING @ 2500 BASE UPPER SV TOP SV MARINE SHALE 4150 BASE SV MARLINE SHALE SV-5 42OO BASE SV-5 4445 TOP UGNU TOP WEST SAK ~ ~ C ~iV ~- ~ TOP SEABEE/AYLYAK TOP SHALE WALL/TUFFS 8800 ¢1¢.T 0 4 199~ TOP HRZ 9453 BASE HRZ 9725 Al~sk~ Oil & ~s Con~. Cornm!: TOP PUT RIVER A!lohoro~g~ BASE PUT RIVER (LCU) LCU /ITKILYARIAK 9725 KEKIKTUK 9810 Intermediate Casing @ 10,720 MD FLOW 5 10809 9810 3700 - 5200 psi FLOW4 10911 9885 FLOW3 11848 9970 FLOW 2 12200 10010 2900 - 5000 psi FLOW1 12320 10110 SUBZONE 3A3(P3) 12419 10180 4800 psi ;~ion Casinc/Tubinq Proqram:' (Casinq set to 7") Hole Csg! Wt/Ft Grade Conn Length Top Btm Size Tbg MD/TVD MD/TVD O.D. /VA 20" 94 L-80 WLD 80 41 121/121 16 13.375 68 L-80 BTC 2420 40 2500/ 12.25 9.625 47 L-80 BTC 10681 39 10720 8.5 7 29 SM 110 Butt 1214 10486 11700 7. 625 29.4 NT 95 FL4S 5268 5218 10486 6 4.5 12.6 L-80. IBM 2054 10500/9590 12554/10331 TBG 4.5 12.6 13 Or NSCT 10362 38 10400/9907 4-06A/Q-32 PERMIT APPLICATION Page 2 Drilling Disuussion Well Objective The 4-06A/Q-32 well is an additional offtake point in the SDI 3B/3C in accordance with the 1996 Central SDI Fiii development plan in order to access additional reserves that would not be recovered by the current wells. The well location has been selected to enhance depletion of the reservoir in Zone 3 and in particular to ensure effective access to the EOR target in this region of the field. Cementinc. -Proqram: - Le~d Cement Tail Cement Casing/Liner Sx / Wt / Yield Sx / Wt / Yield Comments 4-1/2" None 214/15.8 / 1.15 Cemented Limer TOC @ 10,500 MD Volume assumptions: Gauge hole + 30% excess; 80' shoe joints; TOC as designated. Casing Contingencies A full contingency for Slotted 4-1/2" liner exists in the Flow 4 lateral interval. As always, any severe unplanned situations should be discussed with the Operations Engineer and approved by the Drilling Superintendent. Completion Notes This well lateral intervals will be completed with 4-1/2", L-80, cemented liner and perforated with DPC guns. The well will be completed with 4-1/2", 13 Chrome, production tubing. Logging Program: I Logs: I 6" Hole Curve I MWDGR '"~;';;'"'~'~'i'~'"'J~'~'~'~;~i ............ I MWD GR/Directional/Resistivity Density & Neutron Porosity I Cased Hole: I Noneplanned Openhole Logging The following summarizes logging evaluation needs: k. EC iVE_D I Alask.~ 0il & ~ Cone. MWD GR should be picked up on the first bit trip below the 6" kick-off point. GR/EWD "real-time" Resistivity and recorded Density / Neutron should be picked up for 6" lateral intervals BELOW THE HIGH BUILD RATE SECTIONS. DPC No DPC logs are planned but remain a contingency for the lateral hole if MWD logs become unattainable for any reason. Sample catchers are planned to be used while drilling lateral intervals. Survey Program The survey program for 4-06A/Q-32 calls for use of Sperry's DWD MWD surveys the entire well. Because of Sperry's standard practice of changing the MWD probes after every bit run, an electronic single shot (ESS) will not be needed. Mud Program: Production Mud Properties: I 6" hole section: SheardrilI-N Depth Density Marsh Yield 10 sec 10 min pH Fluid (PPG) Viscosity Point gel gel Loss Milling Fluid 10.2 55 - 75 30-40 12 - 18 16 - 24 8.5 - 9.5 <6 Drilling 10.2 48 - 60 20 - 33 8 - 13 18-24 8.5 - 9.0 <6 Hazards/Concerns Pore pressure (_+7 ppg EMW) based on offset SIBHP. Lost Circulation due to overbalance in Flow sands. Differential sticking with overbalance situation. Perform report daily checks on KCI concentrations in Xanvis KCI system. Torque to be combated with 2% lubricant additions. MILLING INTERVAL: A whipstock will be set for this kickoff which will enable the use of the drill in fluid as the milling fluid. The smaller amount of metal returns and the lack of a cement kickoff plug make this an ideal situation to obtain a dual purpose from the same fluid. If any or all of the Sheardriln fluid from 4-34 was salvagable,this can be reused on this well for a cost savings. The yield point of the fluid will need to be elevated to the 30-40 range to ensure adequate carrying capacity for the metal cuttings. The hole should also be swept regularly to assist in hole cleaning. The pump rate should be maintained at the maximum rate allowable at all times. If the pump is going to be shut off, it is recommended to circulate bottoms up first, to lessen the chance of metal settling and forming a birds nest. 4-06A/Q-32 PERMIT APPLICATION Page 3 A small amount of cem~m~t col lination might be encountered. If t.., OCCL .rear the calcium out using Soda Ash. Should any torque or drag reductions become necessary, 1% of EP MUDLUBE should be added to the system ensuring that calcium levels are below 100 PPM prior to addition of the EP Mudlube. Ditch magnets should be used to reduce the metal abrasives being carried in the mud. Hazards/Concerns: Maintain YP for hole cleaning. Possible lubricant need. Elevated calcium due to cement. Maintain adequate stocks of LCM in case losses occur. PRODUCTION INTERVAL: After milling the window, allow the YP to drift back to a range of 20-30. Utilize N-VIS to maintain the Bingham yield point and the Iow shear rate yield point in the specified ranges. Brookfield data should be reported for comparison purposes. Maintain the APl filtration rate at <6 cc with additions of CAT 300 and Ndril Lo. These additions should be made at a 4 to 1 ratio, CAT 300 to Ndril Lo. High viscosity sweeps should be mixed using N-VIS. If torque,drag or sliding problems are experienced, treat the system with EP Mudlube at a concentration of 1%. Do not use Lubetex in the Sheardriln system due to incompatibility. Calcium should be maintained less than 100 PPM in case additions of EP Mudlube are needed. Use Soda Ash to treat the calcium. Use Baracarb for dry jobs, not KCL. Chlorides need to be less than 12,000 to facilitate the logging program and KCL dry jobs would elevate the chlorides. Ideally the chlorides should be maintained in the 8,000 to 11,000 range. . Run as fine of shaker screens as possible at flowline to eliminate solids before they're broken up and incorporated in the mud system. Hazards/Concerns: Maintain adequate stocks of LCM on location,in case of losses. Lubricants for sliding,torque, and drag. Maintain chlorides in the 8,000 to 11,000 range. Do not use KCL for dry jobs. Sweep hole regularly to prevent cuttings beds from forming. Monitor flow and pit volumes closely at all times. Well Control: Well control equipment consisting of 5,000 psi W.P. pipe rams, blind rams, and annular preventer will be installed and is capable of handling maximum potential surface pressures. Diverter, BOPE and drilling fluid system schematics on file with AOGCC. Disposal Cuttings Handling: CC2A Fluid Handling: Annular injection is not available at Endicott for this well. Directional: I KOP: 110795° Maximum Hole An~lle: Tan~lent Angle Close Approach Well: 85.71° 85.71° None after sidetrack Directional Plan The directional plan for the 4-06A/Q-32A well consists of kicking off via whipstock and a lateral interval drilled in the Kekiktuk Flow sands. Current plans call for 25°/100' doglegs below the whipstock, but this may be adjusted pending results during the drilling process. After sidetracking off the whipstock and steering directionally back into the Sands, the well will be dropped down through the Flow 5 thru the Flow 2 drilled to _+12,554' MD (10,331' TVD). The final well path and length may be adjusted (Geo-steered) by the onsite geologist. Ensure that any and all tolerance lines are not crossed to avoid policy violations. Please coordinate this through both the Operations Drilling Engineer and the Drilling Superintendent. Any BHA's indicating less than desired BUR should immediately be pulled for a more aggressive assembly. Recommended BHA's All motors should be jetted properly to account for the proposed flowrates. Hole conditions should dictate actual flowrates. As mentioned previously, flex collars should be utilized in the 6" hole sections to minimize potential differential sticking. Sperry proposed BHA's are attached. 4-06A/Q-32 PERMIT APPLICATION Page 4 Bit Program 6" Hole: We will kick off the The Flow - 4, 6" interval should be drilled with gauge protected roller cone and PDC bits to minimize potential gauge problems. The 6" high angle section is planned for +1,349'. The Zone 4 6" hole section should be drilled with 2 - 3 bits unless directional or geologic problems require additional trips. Insure availability of Sperry's 4-3/4" tandem motors before PU 6" PDC bit. After milling the window, a 6" horizontal section is planned in the Kekiktuk for +1,775'. After drilling the Zone 4 interval, the well will be dropped through the Kekiktuk at 15°/100 utilizing a steerable motor. This interval may be shortened considerably, but it should be drilled with +_2 bits unless directional or geologic problems require additional trips. Suggested Jet Sizes Expected Interval Bit Type Flowrate HSI Window Standard Mills 6" Curve ATJ-P11HD 275-300 gpm 3 x 12 2.9 - 4.8 6" Lateral (N) BBL 880 300-325 gpm 3 x 12 3.8 - 4.8 ,, (R) = Rebuild; (N) = New NOTE: Real time rigsite information such as condition of bits previously pulled, hole conditions, drilling fluids, downhole motor constraints (if any) will be instrumental in actual final bit selection. PDC bits will be run in the 6" hole section only if Sperry 4-3/4" tandem motors are available. Actual hydraulics may vary slightly with downhole parameters experienced at the rigsite. Tripping Practices /Stuck Pipe /Hole Cleaning /Other Tripping in the 6" hole interval should be undertaken with caution. It is recommended that mud weights be maintained in the 10.0-10.2 ppg range to control the hydrocarbon intervals, maintain shale stability and minimize the possibility of differential sticking. Faulted intervals may require additions of LCM prior to tripping to insure that the hole remains full at all times. Keep the pipe moving and have an ample supply of lost circulation materials on hand. See the updated pad data sheet for additional details. Baroid recommends utilization of alternating Iow viscosity / high viscosity sweeps in the 6" hole interval to assist with hole cleaning and to minimize the formation of cuttings beds on the Iow side of the hole. This is especially critical in the horizontal and final drop sections. No potential hazardous levels of H2S are anticipated in the 4-06A/Q-32 well. CONTACTS Drilling Engineer: Chris West Office: 564-5089 Home: 345-4699 Pager: 275-7530 PE Bob Metzger Office: 564-4613 Home: Geologist: Tom Homza Office: 564-5283 Home: 345-1653 Geophysicist: Jeff Sauve Office: 564-5141 Home: 4-06A/Q-32 PERMIT APPLICATION Page 5 Drilling Hazards DRILLING CLOSE APPROACH WELL SHUT-INS There are no drilling close approach wells after the sidetrack of the original 4-06/Q-32 wellbore. PORE PRESSURE /LOST CIRCULATION Production Interval (6"): The Kekiktuk Sands interval may be slightly higher than normal AND VARIES VERY GREATLY, but the pore pressure (based on nearby 3B BHP of 3700 -5200 psi at 9,810' TVDss) should range from _+7.25 to 10.2 ppg EMW. The formation also has the potential for lost circulation (see Geologic Prognosis for faulting details). Lubricant additions (see above) should be utilized if torque and drag become troublesome. Flex collars should be utilized in the BHA to minimize potential differential sticking. Liquid casing and OM Seal should be on hand to help combat lost circulation. NOTE: See the Geologic Prognosis for a detailed description of the expected fault locations and sizes. Review the Pad Data Sheet for trouble highlights throughout S-Pad history. Casing Shoe Kick Tolerance As we will be sidetracking below intermediate casing, we will not require a shoe test. 4-06A/Q-32 PERMIT APPLICATION Page 6 SUMMARY PROCEDURE COMMENTS 1. The 7-5/8" x 4-1/2" production packer is a TIW "HBBP" permanent packer with a TIW anchor latch assembly. 2. The new 7-5/8" packer should be set at +/- 10,412' MD. PRE-RIG OPERATIONS~ 1. Pull the WL SSSV. Drift and dummy off gas lift mandrels, and leave the GLM #1 open. 2. RU wireline and cuttubing above packer. 2. Circulate the tubing with 1.5 volumes of 9.0 ppg seawater. Check that the well is dead. Freeze protect the top 200' with diesel. Set BPV. Note: Maintain contact with Drilling. If rig move is delayed to more than four days after the well kill, a deeper freeze protect will need to be done by the PE's. Dig out the cellar and level the pad. Inspect the wellhead and tree. Test the 9-5/8" packoff and function test the LDS's. RIG OPERATIONS (SUMMARY) Mobilize Doyon 15. Review Endicott Simultaneous Operations Plan concerning rig moves. Check that the well is dead. If not circ well w/9.0 brine. ND the tree, and NU the BOPE. Test the BOPE and pull BPV. (1/2 day) Screw into the landing joint. Pull and LD the tubing. (1 day) P/U overshot and recover the tubing stub. Fish the slick stick and latch. (1 day) P/U mill and PRT for 7-5/8" HBBP. Recover 7-5/8" HBBP packer. (2 days) P/U and GIH with bit and csg scraper spaced out forexpected packer depth to 10,850. TIH to run scraper to just above perfs at 10,924. POH. (1/2 day) Set Bridge plug and whipstock to have top of the window at 10,795. Orient Whipstock to highside with MWD. (1 day) Cut window and 20 feet of new hole with starter mills and WM mills. (1/2 day) Pick up Sperry 4.75" directional BHA and build @ 25°/100 feet to 85° at appx 11,039' MD. POOH. (1day) Pick up Sperry 4.75" directional BHA with extended power section and PDC bit and hold @ 85° at appx 12,008' MD. Then drop @ 15°/100 feet to TD at 12,554' MD. (5 days) Run 4.5 solid liner and cement as per plan. (2 days) Perforate with DPC charges at 1000 psi underbalanced with perforation intervals picked from LWD logs. (3days) RIH w/7-5/8" x 4-1/2" packer, 4-1/2" 13CR tubing, and 6 GLM to expected setting depth. Drift packer, tubing and all jewlery before running. (1 day) Pump Corrosion inhibitor. Set the 7-5/8" packer. Test the tubing to 3500 psi. Test the packer and IA to 3500 psi. (1/2 day) Set the BPV. ND the BOPE, and NU the tree. Shear the RP valve and freeze protect the well. (1/2 day). Turn the well over to Production. . . . . 10. 11. 12. 13. 14. 15. 18. 17. 4-06A/Q-32 PERMIT APPLICATION Page 7 DETAILED PROCEDURE CLEAN OUT THE WELL , Have tubing hanger LDS serviced prior to rig move. Ensure also that the gauges on the tree and annulus valves are accurate. Notify the Endicott PE's of the intent to move over the well. Pick up the handover form. , (MIR U) Move in DOYON 15. Secure nearby wells as per Endicott Simultaneous Operating Guidelines. Any time the BOP's are nippled up or down the well will need to be shut in. . (ND_NU) Ensure a BPV was set during the Pre-Rig work. Remove the tree and adapter flange. NU the BOPE. Install the blinds in the middle cavity. Test the BOPE to 250/5000 psi. Test the annular to 250/3500 psi. Remove the BPV. . . . (PL_TBG) Make up the landing joint to the tubing hanger (4-1/2"). POOH with the 4-1/2" tubing to the cut above the packer (packer at 10,412' MD). (PL_TBG) Pick up an overshot and enough 3.5" drill pipe to reach the 7-5/8" packer. RIH and recover the tubing stub and TIW anchor latch. POH. (PL_PKR) P/U Tristate packer mill and PRT to retrieve the 7-5/8" HBBP. Recover the 7-5/8" HBBP packer. Notes: You may want TIW representative on location when retrieving the 7-5/8" HBBP. 7. (CLN_OUT) PU a 6" bit and casing scraper & TIH to put casing scraper packer setting depth @ 10,850' MD. Bridge Plug Running Procedure 8. RU electric line (multi-conductor cable) unit. 9. PU Baker bridge plug and set at + 2 feet below casing coupling to have the top of the window @ + 10,795. Whipstock Running/Setting Procedure 10. PU the Baker Window Master Milling System oriented to 15° left of high side. Insure that the MWD is oriented to the whipstock face. PU the assembly as shown below: See attached schematics, Figures 5 & 6. Bottom Trip Anchor w/50K shear ring (3-1/2" IF pin down) Whipstock (3-1/2" IF pin down) 5.529" OD Window mill - Shear screw set for 45K (3-1/2" REG pin up) 5.875" OD Lower watermelon mill (3-1/2" IF box) 3-1/2" Flex joint 6.059" OD Upper watermelon mill 3-1/2" HWDP (2 joints) 4-3/4" OD Bumper Sub 4-3/4" MWD (Oriented to Whipstock face) 4-3/4" Drill Collars (9 joints) 3-1/2" HWDP (21 joints) NOTE: PUI joint of HWDP and MU with upper watermelon mill, flex joint, lower watermelon mill and window mill. Whipstock (with anchor assembly locked into orientation position) should picked up with air hoist. Close the blind rams and secure the whipstock in the rotary table. Bolt the window mill to the whipstock making sure the shear pin is as snug as possible. 'Peen' the shear pin hole border on whipstock backside to secure same and keep from falling out. Grind off any excess pin sticking out above the whipstock backside. 11. TIH slowly (_+90 seconds per stand). Avoid any abrupt stops which could cause the pin to shear prematurely. S e t the slips gently on every connection! Reduce tripping speed to _+180 seconds per stand when the whipstock is within one stand of the ML Packer (_+11,870' MD). Continue TIH to _+30' above the packer and stop. PU kelly and record PU and SO string weights. NOTE: As the whipstock is tripped through into the top of the 7-5/8 tie back and the 7" liner section, double check pipe strap and depth correlation. 12. Start mud pumps and orient whipstock assembly with respect to desired orientation (high side). If lug is 180° off of desired orientation, rotate assembly until whipstock anchor is within 45° of correct alignment (should be high side). Pulse the MWD to reconfirm whipstock orientation before "latch-up". If orientation is off greater than _+10°, contact Anchorage office. 4-06A/Q-32 PERMIT APPLICATION Page 8 13. Slack off slowly into pack setting no more than 4-6K down ,,eigh. If not oriented exactly on azimuth, a changing MWD toolface will indicate the tool is properly locating into the ML Packer. PU slowly (15K over string PU weight) to insure latched into packer. If not latched, reorient with MWD and align lug again. NOTE: If "latch-up" is not accomplished after _+360° of pipe rotation, do not continue to feel for "latch-up". This may weaken the shear pin and it may shear before positive latch is certain. If no "latch-up" is observed, POOH and check assembly carefully paying particular attention to groove on anchor seal assembly. 14. Assure positive "latch up" by PU _+15K over eadier recorded PU weight. Slack off 40-50K at the whipstock to shear bolt. Free rotation of the drillstring will indicate that the pin is sheared. 15. Once sheared from the whipstock, displace well with new SheardrilI-N mud. Window Milling Procedure 16. Begin cutting window using only enough WOB and RPM to cut as smoothly as possible especially for the first 2-3' to insure good directional behavior and a good cut into the casing. High WOB's should be avoided during the milling operation. Higher WOB's tend to cause loss of control of the window cutting behavior. Aisc, the mill may walk to the right (indicative of good cement bond) or to the left (poor cement bond). It may also cut into the face of the whipstock. If the window mill has a tendency to slow in penetration rate above the halfway point down the face of the tool, additional WOB may be necessary to "bow" the assembly off high center. This point in the milling process is where most of the actual metal cutting process occurs, so lower ROP's should be expected. Many "green" mills have been pulled at this point. The final 2-1/2' of window should be cut with extreme care. If void (i.e. minimal cement) exists behind pipe, the mill may "jump off" the whipstock instead of traveling along the whipstock face as designed. Cement calculations in the original 8-1/2" hole were planned to insure high compressive strength slurry to a minimum of 500' above the planned window exit depth. 17. Recommended window milling timeline and parameters are: Time Torque WOB Cum. Footage RPM (min) (ft lbs) (lbs) (ft) I hr 1 hr 1 hr 1 hr 1 hr 2hr 2 hr 2hr 2 hr 2hr 3hr 3hr 0 2250 0 0.00 50 10 3000 1000 0.50 50 15 3000 2000 0.75 50 20 3000 2000 1.00 50 30 3000 2000 1,50 50 35 3000 3000 2.00 50 40 3500 3 - 5K 2.50 80 45 4000 5000 3.00 80 10 4000 5 - 6K 4.50 80 20 Reaming 5.00 30 30 3500 4000 5.25 80 45 2500 4000 6.50 80 55 3000 4000 7.00 80 10 2500 4000 7.75 80 20 3000 5000 8.00 1 00 30 3500 5000 8.50 1 00 45 4000 5000 1 0.0 1 00 55 Reaming 12.0 30 10 3500 Formation 14.0 100 20 Formation 16.0 1 00 NOTE: Recommended flow rates are 5-6 bbl/min. After milling 16' past top of whipstock, it should be noted that the mill should be now drilling entirely new formation (if able to drill ahead). Observe similar 5K WOB and 100 RPM parameters unless additional WOB is neccesary to make hole. The combination of casing and open hole milling must total 29' to allOw the watermelon mill to pass completely through and down to the bottom of the window effectively reaming the sidetracked interval. DO NOT MILL FARTHER THAN 29' PAST THE TOP OF WHIPSTOCK. 18. Work the milling assembly up and down through the window several times to insure all tight spots and torque are minimized or eliminated. Ideally, assembly should be able to trip through window interval with pumps off. Circulate and condition. Pump high vis pill to assist with removal of metal and cement cuttings. N CT E' Upon removal of the milling assembly, inspect the gauge of the upper full-sized watermelon mill. If the watermelon mill is more than 1/8" undergauge, plan an additional reaming trip to insure directional BHA's can get through window. If additional reaming is needed, run new full-sized watermelon mill AND new full-sized window mill. Drilling Lateral (Kekiktuk) 19. PU 6" bit, 2-1/4 - 2-1'/2° (pending required DLS) BH motor, GR/MVVD and TIH. Directionally drill building angle (initially) at 25°/100' to _+11,039 MD (_+9954' TVD) per directional plan or as directed by the onsite geologist. POOH. Be sure to orient the bit away from the whipstock face BEFORE inducing bit rotation and/or attempting to the exit the window. 4-06A/Q-32 PERMIT APPLICATION Page 9 NOTE: A 25°/100 .S is planned to reach desired targe, uefo, ,ripping for the lateral drilling assembly. Due to dogleg constraints of the Sperry Slim Phase 4 Resistivity tools, these tools will not be run through any doglegs over 30°/100'. Insure all Sperry Sun guidelines for tripping A L L MWD tools through high doglegs are observed (25°/100' sliding and 14°/100' rotating). As GR is the primary geo-steering device, resistivity tools have been eliminated. It is highly recommended that stablizers (in the BHA) NOT be run until a minimum of 70-100' of progress is made outside the window (this will allow insertion of stabilizers - as long they are positioned below the window prior to drilling ahead - on subsequent trips). This will help minimize damage to the whipstock face. IMPORTANT WHIPSTOCK / WINDOW GUIDELINES ALWAYS TRIP SLOWLY AND CAREFULLY (_+90 SEC PER STAND) WITH ALL BHA'S THROUGH ANY MILLED WINDOW. NEVER ROTATE UP OR DOWN ON THE FACE OF THE WHIPSTOCK WITH A ROCK BIT OR STABILIZER. These items may "catch" the edge of the whipstock and damage it or cause it to turn inside the casing thereby either partially or completely covering the window exit. NEVER ENGAGE PUMPS (WITH MUD MOTOR IN THE BHA) WHILE THE BIT IS ON THE FACE OF THE WHIPSTOCK) Bit rotation may "catch" the edge of the whipstock and damage it or cause it to turn inside the casing thereby either partially or completely covering the window exit. If at any time during drilling operations a problem is encountered tripping through the window area, a watermelon or string mill should be run in the drilling assembly to clean up the window area. 20. If fishing operations are commenced through the window area, always run as small as an O.D. fishing tool as possible. If overshots or box taps are utilized, small cutlips (1/2 - 1") are recommended. And while fishing assemblies should be flexible, string mills should be run directly above any fishing tools. The string mills will provide standoff and prevent any cutlip or other "edges" from hanging up on the top and bottom edge of the whipstock face. PU 6" bit, 1-1/4° BH motor, GR/EWD Resistivity MWD, TIH and directionally ddll a horizontal hole to a TD of _+12,554' MD, -+10,331' TVD per directional plan or as directed by the onsite geologist. POOH. NOTE: OBSERVE WHIPSTOCK/WINDOW TRIPPING GUIDELINES ABOVE. 21. Make a conditioning trip with the Baker Fixed Blade 6" hole opener. Circulate and condition the well bore. POOH to window area, just above whipstock. Circulate bottoms up. Drift all drill pipe to 2.00" and SLM on last trip out of hole prior to running liner. NOTE: PU NB "rounded shoulder" stabilizer above rigid blade hole opener (similar to previous applications with this BHA) to insure standoff while tripping through the whipstock/window area. Observe window tripping guidelines. This BHA had to be gently worked through the window on the other wells. Lateral (Kekiktuk) Completion 22. RU and run 4-1/2", L-80, cemented liner (per Recommended Practices). Run liner as configured below and hang off in rotary table: 4-1/2" Baker "bladed" guide shoe 4-1/2" liner (length to be determined, appx length of 2054 )feet Baker liner hanger with Liner top packer and setting tool assembly NOTE: Liner should be spaced out to land the top of the liner 150 feet back into the 7" Liner (below the 7-5/8" tie-back). Liner should be centralized (while on pipe rack) with two right-hand, 4-1/2" x 5-5/8" turbolators on every full joint up to start of the horizontal section @ 11039'. Use one turbolator per joint in the liner lap. Unless well conditions dictate otherwise, do not install 4-1/2" rams for liner. 23. MU one stand of drill pipe and lower assembly. Break circulation, but do not exceed recommended rate of 6 - 8 BPM. Do not exceed circulating pump pressure of 1,500 psi without consulting with Field Engineer. Document pickup and slackoff weights of liner. 24. RIH with liner on 3-1/2" drillpipe observing tripping guidelines in the window area. Control running speed to prevent formation damage. On last single in, break circulation, wash down and tag bottom. Slowly increase pumps until full circulation is established at 5-8 BPM. Double check liner hanger/packer setting depth and reciprocate the liner during the cement job, or for as long as hole conditions allow. NOTE: Before entering open hole at the window, record PU and SO weights of the string. Break circulation, but do not exceed 6 - 8 BPM. Record pump pressures. 25. Continue into open hole with the liner. The hole may be circulated if necessary however, rates should be kept to 6 - 8 BPM if possible. Do not exceed 1,500 psi circulating pressure. 26. RU cementing unit, surface equipment and flow meter. Test lines to 4,500 psi. Mix and pump: pre-flush, spacer, cement, top dart (per Sidetrack Recommended Practices). POOH and LD DP. 4-06A/Q-32 PERMIT APPLICATION Page 1 0 NOTE: Cement volumes based on an 80' shoe joint, 150' ,....~r la~ .00' excess above liner, and openhole volume plus 50% excess calculated to the KOP. Ensure that displacement is pumped from the tank of known volume with the return taken into the tank with the known volume as well. 27. 28. 29. CONTINGENCY FOR NOT REACHING (KEKIKTUK) TD WITH 4-1/2" LINER If for any reason the 4-1/2" liner does not reach TD in the Kekiktuk lateral, DO NOT RELEASE FROM LINER. POOH with the liner and make a second hole opener run to clean out any bridges or obstructions and rerun the liner. If unable to POOH with the 4-1/2" liner, an inside casing cutter should be run and the liner cut below the window area at an appropriate depth to insure no 4-1/2" liner remains inside the 7" casing. Tag bottom and rotate to the right to release the liner from the setting tool. Release from liner running tool leaving top of liner 150' above the top of the window. PU 4-5' to confirm released from running tool (loss of weight). Tag liner top to confirm outside window. PU workstring, establish circulation and displace the well with sea water circulating as necessary to clean annular area. Do not spot lithium hypoclorite breaker in this well. POOH to top of 4-1/2" liner and circulate bottoms up. Continue POOH with setting tool(Do not rotate out of hole). Rack back DP. RECEIVED OCT 0 4 !996 4-06A/Q-32 PERMIT APPLICATION Page 1 1 Drillpipe Perforating Procedure NOTE: Radio transmitter in weather monitoring shack must be turned off before any well work involving explosives can begin - contact North Slope A Pad Operator. , Hold pre job safety meeting with crews before P/U perforating guns. Review H2S risks, spill prevention, and well control. While making up the guns make sure that only essential personnel are present on the rig floor. Rig up tank away from rig and plumbed to accept returns from the well. (Dike and berm the tank) . While picking up and running the perforating guns and associated tools (firing heads etc.) there should be only essential personnel on the rig floor (driller, perforating crew and packer hand). All other personnel will stay off of rig floor until the perforating equipment is below the rotary table. . Perforating guns will be run with hand slips (not air slips.. It is imperative that all slip dies be inspected prior to running the guns. (Dies that are dull will tend to let the guns slip and catch causing the charges within to shift and possibly rotate out of the scalloped area of the gun. 4. MU Perforating/underbalanced assembly in the following order: Absolute pressure firing head Perforating guns & blanks, as per production specs. Differential Pressure Firing Head 2-7/8" PAC 6.4# L-80 tubing Below Packer Safety Joint Bypass Port Champ III Packer ( To be set in the 7" casing just above 4-1/2" liner top) Hydraulic underbalance valve Jars PR FAS-FIL Valve 3.5" DP to surface (as required to space out above the liner top. Notes: · Atlas will provide BHA detail diagram. · Caliper all tool lengths and OD's. Note drift of 4-1/2" 12.6# liner. · Have the 2-7/8" PAC tubing inspected prior to every job and do not run pup joints in the 2 7/8" segment. · Insure that the packer setting depth will not be in an area that exceeds 60° of inclination or an area of high dog leg severity. · Space out packer by allowing LC to be tagged w/firing head. Pickup and place bottom shot at the requested depth. · In order to set guns on depth with drillpipe measurement, a strap of the cleanout string is essential. · Below Packer safety joint should be set to shear @ 70K#. · Pin PR FAS-FIL valve to shear at hydrostatic pressure required to achieve desired underbalance. Set valve to give a desired underbalance. Shear pressure - Reservoir pressure-underbalance. . RIH w/assembly on DP. Note TVD and MD at which PR FAS-FIL valve is set to shear. Stop at this depth, close annular, and pressure annulus to 400 psi. . No flow up DP indicates valve has closed. If valve has not closed, release pressure and repeat. Fill drill pipe with fluid to this point. Continue in hole with dry pipe. In the event the PR FAS-FIL is not actuating properly, POOH and investigate (do not continue RIH.. Tag LC w/firing head and position guns on DPM. 7. Set the Champ III packer with 1/4 turn (at tool. to the right and 20K# down weight. . R/U HOWCO flow head. Shoot fluid level inside DP to verify fluid level, shut annular on drill pipe. Ensure that the hard line to the outside tank is ready by having a visual inspection done from the floor manifold all the way through to the tank. Also dedicate one person to monitor the tank and the outside lines during the flow period and while reversing out any produced fluids. . Pressure test all lines to 3000 psi. Fire the guns by pressuring up on the annulus to _+2500 psi. Monitor guns firing with the fluid level equipment. Once guns have fired bleed annulus pressure to 500 psi .If the differential firing head fails, the absolute firing head will be pinned to fire at +_2000 psi applied at surface on the tubing. Prior to firing the absolute firing head, it will have to be determined whether underbalance is necessary, if so, then the string will have to be pressured up with nitrogen to 2000 psi and then bled off during the delay period of 15 minutes before the guns fire. If underbalance isn't a factor then fill tubing, open the packer by-pass, and circulate around to ensure the underbalance valve is open. Once that is established, close the by-pass valve and pressure up tubing to 2000 psi and bleed off to zero during the 15 minute delay period. Note: All guns can be run with the Absolute Firing Head with the exception of the 2 1/2" guns. 10. Flow well and monitor with the fluid level indicator every 5 minutes and by the amount of blow in the bucket. Take any returns to the outside tank. 11. Bleed off the pressure on the annulus. PU 20K to open by pass and reverse out tubing two tubing volumes, flowing produced fluids to the outside tank. Unseat packer, monitor well for flow or losses and allow the packer 4-06A/Q-32 PERMIT APPLICATION Page 12 elements to relax prior to pt~ j out of the hole. 12. POOH and monitor fill-ups closely, when the first gun is to surface have a short safety meeting reiterating to the crew that the guns could possibly have trapped gas and that extreme caution is needed when breaking connections (especially the blanks between spent guns.. 13. LD perforating guns and insure that the hole is kept on continuous fill. Establish that all guns have fired and if they haven't then again only essential personnel will be on the rig floor to dismantle the guns. 14. RD equipment of perforating personnel and lay guns out for removal. Inspect and report all shots fired or misfired. 4-06A/Q-32 PERMIT APPLICATION Page 1 3 4-1/2" Tubing Completio. 30. Run 4-1/2", L-80 tubing with SSSV (and control line), GLM's and a 7- 5/8" x 4-1/2" packer assembly with an 'X/X/XN' tailpipe configuration. Packer should be set at_+10,412' MD to facilitate lowermost GLM placement. Displace well with filtered sea water and corrosion inhibitor. Drop ball, pressure up to 4,000 psi to set packer. Hold pressure and test tubing to 4,000 psi for 30 minutes. Refer to Recommended Practices on Standard Tubing Running, Version 3.2. Recommended Practice for Running Tubing Completion Detail WLEG Above the top of the 3A subzone at 12,200' 10' pup joint X or SWN nipple with RHC plug pinned not to shear. 10' pup joint 10' pup joint X or SWS nipple 10' pup joint 10' pup joint 7-5/8 Packer Baker S-3 packer 10' pup joint X or SWS nipple 10' pup joint bottom GLM (8600TVDSS) 10' pup joint GLM's and tubing as shown on space out table 10' pup joint SSSV landing nipple 1500' 10' pup joint tubing space out pups as needed 1 joint of tubing XO if needed 6'- 10' pup joint tubing hanger landing joint NOTE' GLM SPACING STATION 1 2 3 4 5 6 TVD(ss) GLV Type 9444 w/dummy 9248 8551 7436 5793 3367 RP Shear valve Final GLM design to be determined. GLM's to be Camco model KBMG for 4.5" tubing ain 7-5/8" 29#/ft casing. 32. 33. 34. 35. 36. 31. Install a two-way check and test to 1,000 psi (from the top). ND BOPs. Install and test the production tree to 5,000 psi. RU lubricator and pull two-way check. Test the tubing - casing annulus to 3,500 psi for 30 minutes. N O T E: Hold _+2,000 psi on tubing during annulus test to insure RP valve does not shear early. RP valve should be pinned to shear at 2,900 psi (casing to tubing) differential pressure. Bleed tubing pressure, shear RP valve in the upper GLM and freeze protect the well to _+2,200' MD. Set a BPV. Release rig. Complete handover documentation, attach well schematic (as completed) and release well to Production. List composition, approximate volume and density of freeze protect fluid placed in the wellbore. 4-06A/Q-32 PERMIT APPLICATION Page 1 4 4.5" CASING CEMENT PROGRAM - Halliburton CASING SIZE: 4.5" SPACERS' 20 bbls 2% KCL water 50 bbls MCS-4 2/2% KCL @ 1 ppg over MW CIRC. TEMP:140°F STAT. TEMP' 220° F CEMENT TYPE TAIL: Class G + 0.5% CFR-3 + 0.7% Halad 344 + 0.1% HR5 + 4 pps Cuper CBL TAIL SLURRY Density: 15.8 ppg Yield: 1.15 ft3/sk Volume: _+214 sx Pump Time: +_4 hours TOC: -+10,500' MD Fluid Loss: <30 cc Free Water: 0.0 cc Excess: 30% Comp. Strength: 1,800 PSI 3,000 PSI Compressive Strengths at 12 and 24 hours respectively. SLURRY PLACEMENT TOC equivalent to the liner top (assumes 7" window at -+10,795' MD). OTHER CONSIDERATIONS: Perform lab tests on mixed cement/spacer/mud program and ensure compatibility prior to pumping job. Ensure thickening times are adequate relative to pumping job requirement. Displace at 6 BPM. Temperatures estimated by Halliburton and are representative of those encountered in the region around SPI. CEMENT NOTES' I , . 4. 5. 6. 7. 30% excess (based on gauge hole). Centralization: Run 2 straight blade per joint from TD to above. Run 1 st. blade rigid centralizers above window in 7" casing Hook up flow meter and have Halliburton generate rate vs. pressure plots. Pumping order: Fresh water, spacers, tail slurry (on the fly), Liner wiper dart. Displace with mud at 6 - 8 BPM. Calculated ECD's show max of 12.65 ppg EMW. Reciprocate casing as long as hole conditions allow; land on hanger if sticky. Slow pumps 5-10 bbls before plug bump; bump plug to maximum 3,000 psi. 4-06A/Q-32 PERMIT APPLICATION Page 1 5 Sidetrack Cement Calculator Cement and Centralizer Calculations Well 4-06A/Q-30 Production Liner I Sta[ Hole Size Casing Size BFF BPF + 30% Stage 1 Liner Top Kekiktuk Top TD e Cement Job 4.5 0.0153: 0.0199 MD Cement Premium G Yield 1.15 Top of Cemenl Calculated BBLS Cu. Ft. Sacks 44 246 214 10500 Total G ST1 21 4 4.5" St Blades 102 From 12554 to 10809 One in 7" shoe 1 Total ST Blades 1 03 Page 1 r~ _~ _~ D TIONAL WELL PLAN for SHARED SERVICES DRILLING Anadrill Schlumberger Alaska District 1111 East 80th Avenue Anchorage, AK 99518 (907) 349-4511 Fax 344-2160 Well ......... : 4-06/Q-32A (P6) Field ........ : ENDICOTT, SDI Computation..: Minimum Curvature Units ........ : FEET Surface Lat..: 70.32183633 N Surface Long.: 147.86334225 W LOCATIONS - ALASKA Zone: 3 Legal Des cript ion X- Coord Y ~- Ccord ~:.~rface ...... : 2578 FSi, 536 FFL S08 TllN RiTE UM 27:cLui. 46 5970798.49 Tie-.in Survay: LO~' ~'. 23~.7 U'EL $08 TllN RI~E ~,~- 2687=5.7i F~;3332.45 TARGET ....... : .583 m~"L J±92 FEL S05 TllN R17E u~ ,~?~37.~-C 5974154.00 ~_~:L ......... : ~$~ FSL 3522 FEL S05 TllN R!?~ 5q4 267614.93 5974447.45 STATION IDENTIFICATION ~k~POSED WELL PROFILE Prepared ..... :08/29/96 Vert sect az.: 310.58 KB elevation.: 56.00 ft Magnetic Dcln: +28.889 (E) Scale Factor,: 0.99995999 Convergence..: -1.75459139 COORDINATES- FROM TOOL DL/ WELLHEAD FACE 100 ANADRILL AKA-DPC APPROVED PERMITTING ONLY LAN ..... :_~ :, _ ~ ~ ~..~.~ STATE- PLANE X Y EEAS INCLN DIRECTION VERT-DEPTHS SECT DEPTH ANGLE AZIMUTH TVD SUB-S DIST TIE-IN SURVEY 10788 35.30 TOP OF WINDOW 10795 35.27 KOP CURVE 25/100 10800 35.24 TOP FLOW UNIT 5 10809 36.71 10850 44.51 350.27 9826 9770 2772 2488.72 N 1518.73 W 268759.71 5973332.45 142R <TIE 350.32 9832 9776 2776 2492.93 N 1519.44 W 268759.12 5973336.68 142R 0.58 350.35 9836 9780 2778 2495.78 N 1519.93 W 268758.72 5973339.53 48L 0.58 347.72 9843 9787 2782 2500.68 N 1520.88 W 268757.92 5973344.47 45L 25.00 337.17 9875 9819 2805 2526.27 N 1529.19 W 268750.40 5973370.30 37L 25.00 TOP FLOW UNIT 4 END 25/100 CURVE 10900 54.85 10911 57.21 10950 65.73 11000 76.89 11039 85.71 327.92 9907 9851 2840 2559.88 N 1546.91 W 268733.71 5973404.43 31L 25.00 326.21 9913 9857 2849 2567.53 N 1551.87 W 268728.99 5973412.23 30L 25.00 320.81 9932 9876 2882 2595.01 N 1572.27 W 268709.44 5973440.32 28L 25.00 314.85 9948 9892 2929 2629.98 N 1604.06 W 268678.74 5973476.25 26L 25.00 310.58 9954 9898 2968 2656,15 N 1632.43 W 268651.19 5973503.28 25.00 TOP FLOW UNIT 3 11848 85.71 310.58 10014 9958 3774 3180.64 N 2244.72 W 268055.27 5974046.24 0.00 o o (Anadrill (c)96 Q32AP6 3.0b.03 9:27 AM P) 4-06/Q-32A (P6) PROPOSED WELL PROFILE 08/29/96 Page 2 STATION IDENTIFICATION DEPTH ANGLE DROP 15/100 12008 85.71 TARGET ************* 12008 85.71 12050 79.42 12100 71.92 12150 64.42 MEAS INCLN DIRECTION XPERT-DEPTHS SECT COORDINATES-FROM STATE-PLANE TOOL DL/ AZIMUTH TVD SUB-S DIST WELLHEAD X Y FACE 100 310.58 10026 9970 3934 3284.73 N 2366.24 W 267937.00 5974154,00 LS 0.00 310.58 10026 9970 3934 3284.73 N 2366.24 W 267937.00 5974154.00 LS 0.00 310.58 10031 9975 3976 3311.79 N 2397.83 W 267906.25 5974182.02 LS 15.00 310.58 10044 9988 4024 3343,28 N 2434.59 W 267870.47 5974214.62 LS 15.00 310.58 10062 10006 4070 3373.46 N 2469.82 W 267836.19 5974245.85 LS 15.00 12200 56.92 12250 49.42 END 15/100 DROP 12279 45.00 ~:' 12554 ~5.00 310.58 10087 10031 4114 3401.79 N 2502.90 W 267803.99 5974275.19 LS 15,00 310.58 10117 10061 4154 3427.81 N 2533.27 W 267774.43 5974302.12 LS 15.00 310.58 10137 10081 4175 3441.86 N 2549.67 W 267758.47 5974316.66 15.00 310.58 10331 10275 4370 3568.19 N 2697.15 W 267614.93 5974447.45 0.00 o ANADRILL AKA-DPC APPROVED FOR PERMITTING ONLY PLAN (Anadrill (c)96 Q32AP6 3.0b,03 9:27 AM P) JB K __ SHARED SERVl]CES il i DRILLING iii i i Anadr i ] ] $ch ]u~berger 4-06/Q-32A (PC) VERTICAL SECIION VIEW - isection at: 3~0.58 j A~iADRILL ,. AKA-DPC ' ITVD Scale.: 1 inch : 300 feet APPRCIVED ' IDep Sca]e.: I inch = 300 feet -- ' .~,,~. ,mrm~,~lT"'r Nil"'_ JDpawn ..... : 08/30/96 I ONLY "=~ r~l~ ~ ~ ~ o Harker Identification MD BKB ~CTN INCL ~ -- Al lIE-IN S~VEY 107BB 9826 2772 35.~ ~ ~ B} TOP OF WINDOW ~0795 9B32 2776 35.2 C) KOP C~VE 25/100 IOBOO 9836 2778 35.2 , D) END ~/100 CURVE 11039 9954 2968 85. '~-~-3¢( ......... ~ ..... E) DR~ J5/JO0 J2OOB 10026 3934 BS.~ J ' Fl TARGET ~>~ ~2008 ~0026 3934 85.~ ~% ~ ....... , ~ Gl END 15/100 DROP i2279 10137 4t75 45.( ....., ,' HI TO !~554 ~C'J3~ 4370 45.[ ~/g~ B~tSagl~' i~ .... ":; ~ - ~ z~ ............... '"' , ~ I i .... ... .... , .... 2400 2550 2700 2850 3000 3150 3300 3450 3600 3750 3900 4050 4200 4350 4500 4650 4BO0 4950 5t00 Section DeparLure (Ana~ri]! {c)96 032AP6 3.0b,03 9:45 ,U,I P} - 0 ~O 0 0 ,q 0 AUg-30-96 O9:50 Anad~"ll DPC 907 344 2160 P.04 SHARED SERVICES DR LLTNG / -32A (P6) " N--t./U/ Ij-,Jr~ ti-U/ VERTICAL SECTION VlE~ Section at: 310.58 TVD Scale.' ! inch ~- 1200 feet ., Oep Scale.' ~ inch = ]200 feet Drawn '08/30/96 ! ~nadri ]] Schlumberger Marker Identification MD BKB SECTN INCLN A) TIE-IN SURVEY 107~ 9826 2772 35.30 B) TOP OF WINDOW 10795 9832 2776 35.27 _. C) KOP CURVE 25/t00 IOBO0 g836 2778 35.24 ', ...... D) E~ 25/t00 C~VE 11039 9954 2968 85.71 E) DROP 15/t00 12008 10026 3934 85,7t F) TARGET xwww~wMw~xxx 12008 10026 3934 85,71 G) END S5/100 DROP 12279 10t37 4175 45.00 i "' H) TD 1;)554 10331 4370 45.00 I AN~kDRILL AKA' DPC , ~kPPROVEI) -- ~ ~i~ ~IIIt i IiIII ~k I~Ill ,, · ' -r"--.--.? ~;01(, I"I'-KN~I I , OI, ILY .~~.. ~ ...... ". ............. -J ~ . "...~ ........ ~ ~ ',~",o~n-,'~ ...... ----'- ' ..... i .............. "~' ~ ~' ..... .... ,,1..1.i~:' :~ " ....... ;"' ! -- : ! :. -' -' -' -' -' -' -' -'_ :_ ~ :-:,~r~: 0 600 I200 1800 ;3400 3000 3600 4200 4800 5400 6000 15600 7200 7800 .~-~c,t.~?n Dep.arture (~a~ill (c)96 0~ 3.~.03 ~44 ~ P) Aug-30-96 09:51 AnadY~ll DPC · 907 -~44 2160 P.06 m SHARED SERV 'ES' DRILLING · v i · .o ,,. 4-06/Q-32A (P6) El DROP t5/J00 12008 3285 N 2366 ~ CLOSURE ' 4473 feet at AZimuth 322.91 TARGET ~x~)~**~)~ 12008 3~85 N ~366 ~ ~ E~ ~5/~00 DROP $2279 3442 N 2550 ,~ DECLINATION.' +28.889 (E) H) TD 12554 3568 N ~6,97 ~ SCALE · ~ inch = 600 feet DRAWN '08/30/96 i iii AnadrJ ]] Sch]umDerger ~.... . , 3500 . ~;ET (Radius 150 f~et 1' 3000 ..... 2700 ,8 .... ~ ~00 ....................... 2~00 ' ' ~ ' ~00 _ ~~ ~ ~~~ ' ........ ~ ....... ~500 ANAD~ILL t ,KA-DPI' Akl I V ,., . . . .-- ~ ...... ....~ 600 ...... ~=:.. 300 ........ I ..... .... ~00 ~0 3300 gO00 ~700 ~00 8100 ~800 ~500 t~00 ~00 ~00 ~00 0 -' ' <- WEST' EAST -> m 3 9:45 AN Pi Aug-30-96 09:51 AnadF~-ll DPC 907 t44 2160 P.07 L~'~ n re, ii _,x~.,J Anadriii Alaska District Directional Well Planning Department NORMAL PLANE TRAVELLING CYLINDER RESULTS INCLUDING ELLIPSES OF UNCERTAINTY Client .............. : BP EXPLORATION we~l Name ....... : 4-06/Q-32A(P06) Field ................ :ENDICOTT County/State..: BEECHEY POINT, ALASKA AP~# ................ : 50-029-21723-01 Anadrill ID# ......: 500292172301P0603 OFFSET WELL 4-06/Q-32 4-02/Q-28 4-08/P-27 4-08/P-27 4-18/S-30 4-20/M-35 4-04/T-26 4-20/T-34 4-10/M-28 4-10/M-28(G01 DI-01 4-26/O-34 3-09/L-28 3-09/L-28A 3-15/K-33 4-28/N-37 4-14/R-34 3-05/0-29 4-42/P-38 3-11/M.30 3-23/N-32 3-01/N-29 3-35/L-36 4-38/K-34 3-29/J-32 3-27/M-33 4-46/N-39 3-21/L-34 3-33/K-37 3-39/J-39 3-07/N-28 3-49/J-40 3-49/J-40A(HA, 3-49/J-40APB1 3-45/M-39 3-47/G-35 4-32/K-38 4-34/O-38(HA 4-34/0-38PB1 4-40/P-43 DI-02 3-03/J-33 3-17/J-30A 3-17/J-30 3-25/M-27 4-44/M-44 4-48/K-43 3-41/K-39 4-50/K-41 3-37/L-35 3-19/R-28 1-59/0-24(D01 3-43/P-38 MIN. FLOWING SAFETY SEP. -231,5 -69.2 -45.3 -8.3 -35.3 -14.2 -2,4 -13.1 0.2 2.3 79.9 77.7 73.5 74.0 73.9 101.9 22.3 81.4 149.5 102.7 135,9 105.5 185.3 176.1 174.4 176.5 192.2 144.2 200.1 209.5 137.8 283.3 (P0~]83.2 P0~83,2 248.1 257.8 138.7 EC)Ipr~,4 '01)155.4 177.2 960.8 159.6 167.4 168.9 180.7 199.3 225.1 255.7 234.1 244.6 179.9 293.9 272,2 ELLIPSE SEP. -142.5 -16.4 -4.1 2.2 11.1 40.8 8.5 49.8 10.3 12.5 147.6 138.8 121.0 121.2 120.5 157.2 32,4 115.4 209.5 141.3 178.3 135.6 233.8 219.9 214.4 213.8 232.8 172.8 236.7 247.3 159.7 328,8 328.8 328.8 286.6 297.6 149.1 165.1 165.1 188.0 1021.2 168.9 177.1 178.6 190,7 209.4 235.2 265.7 242.8 252.1 184.8 301.8 279.0 SURVEY SEP. 0.1 MD Planned Well Survey Program Start End Type Interval 0 10800 GCTG '10800 12554 MEWD 20.9 23.2 8.3 43.0 80.1 14.8 98,7 18.0 18.4 321.3 184.5 163.6 163.7 152.4 196.7 38,3 136.4 253,1 166.2 206.5 153.1 267.4 258.8 240.6 237.6 259.4 189,4 259.8 271.6 172.4 359.8 359.8 359.8 311.5 323,6 157.2 169.7 169.7 196.2 1178.2 176.0 184.5 184.2 196.6 217.0 241.1 271.6 247,8 257.8 187,1 307.9 282,1 10801 4276 3123 700 3645 4500 726 5581 675 675 6527 5225 3752 3724 3653 4526 675 2401 5001 2853 3231 2002 3850 3377 3004 2728 3O54 1903 2654 2778 1457 3554 3553 3553 2854 2979 696 648 648 720 5091 623 64~ ~71 671 6?2 66~ 578 501 325 526 451 TVD mm FLOWING SAFETY DIST. 89.0 52.8 41.2 10.5 46.5 55.0 10,9 62.9 10. 10,1 67.6 61.1 47.5 47.2 46.5 55.3 10.1 34.0 60.0 38.5 42.3 30.0 48.5 43.8 40.0 37.3 40.5 28.5 36.5 37.8 21.8 45.5 45.5 45.5 38,5 39.8 10.4 9,7 9.7 10.8 60.5 9.3 9.7 9.7 10.1 10.1 10.1 10.0 8.7 7.5 4,9 7.9 6.8 9837 ¢274 3121 700 3644 4498 726 5579 675 675 6480 5223 3751 3722 3652 4525 675 2400 5000 2852 3230 2001 3848 3375 3002 2727 3052 1902 2652 2777 1455 3553 3552 3552 2852 2978 696 648 648 720 6090 623 648 648 671 671 I 67~ 66~ 578! 501~ 325 526 451 93 PLUGGED SAFETY DIST. 27,0 10.7 7.8 1.8 9.1 11.3 1.8 14.0 1.7 1,7 16.3 13.1 9.4 9.3 9.1 11.3 1.7 6.0 12.5 7.1 8.1 5.0 9.6 8.4 7.5 6.8 7.6 4.8 6.6 6.9 3.6 8.9 8.9 8.9 7.1 7.4 1.7 1.6 1.6 1.8 12.7 1.6 1.6 1.6 1.7 1.7 1.7 1.7 1.4 1.3 0.8 1,3 1,1 AN~ Date Calculated ..... : 08/29/96 09:38 Date Plotted .......... : 08/29/96 09:41 KBE ..................... : 56.00 Grid X .................. : 270201,46 Grid Y .................. : 5970798.49 Grid Zone .............: ASP ZONE 03 ENTER PLUG ZONE MD 11 734 2734 376 3296 3854 522 5422 )RILL A~ :OR NOTES: All depths & distances are in FEET Ail depths a~e referenced from well 4-06/Q-32,\(P06~ ! Min Flowing Safety Sep. Is amount of additional ~:.'ear~nce ;~-.~m flowing ,afet~ line. 1 I 1 1 East 80th Avenue · Anchorag~ a;~a 99~ 1 fl, * Telephone: (907) 349-4511 ENTER NO DRILL ZONE MD 24 933 3002 : PRO' ERM EXIT NO DRILL ZONE MD 11019 4507 3224 . _ /ED TTIN EXiT PLUG ZONE MD 11041 4687 3349 1013 3849 4786 899 5697 .. ~A-DPC ,G ONLY PLAN FAX: (907) 344-21 60 CLOSE APPROACH STATUS NO DRILL NO DRILL NO DRILL PLUG PLUG PLUG PLUG PLUG FLOW FLOW FLOW FLOW FLOW FLOW FLOW FLOW FLOW FLOW FLOW FLOW FLOW FLOW FLOW FLOW FLOW FLOW FLOW FLOW FLOW FLOW FLOW FLOW FLOW FLOW FLOW FLOW FLOW FLOW FLOW FLOW FLOW FLOW FLOW FLOW FLOW FLOW . FLOW FLOW FLOW FLOW FLOW FLOW FLOW Aug-30-96 0g:53 Anadr-~ll DPC 907 2i60 Alaska District Directional Well Planning Department NORMAL PLANE TRAVELLING CYLINDER RESULTS INCLUDING ELLIPSES OF UNCERTAINTY Client .............. : BP EXPLORATION Well Name ....... : 4-06/Q-32A(P06) Field ................ :ENDICOTT County / State.,: BEECHEY POINT, ALASKA APl# ................ : 50-029-21723-01 Anadrill ID# ......: 500292172301 P0603 Planned Well Survey Program Start End Type Interval 0 10800 GCTG Date Calculated ..... : 08/29/96 09:38 Date Plotted .......... : 08/29/96 09:39 56.00 27O201.46 5970798.49 ASP ZONE 03 0500 675o 9000 11250- 12000 O , , o ~. .,~ m !:;1'i35e /~/I / /" / /~ //I 3 ~ ~ ~ 3-35,L / · 0C F 0 4, 9S8 ' Ale(: t ~ )asOons. Commis~o.n ; nchom~ ,~ ........ ~ ~.. AN,~DRILL AKA DPC , PPROVE) FOR PERMIT';lNG 0 ILY. ~ ........... ID 125 10800 12554 MEWD 93 KBE ..................... : Grid X .................. : Grid Y .................. : Grid Zone ............. : -50 -25 0 25 50 75 100 125 150 175 200 225 250 NORMAL PLANE SEPARATION (1" = 50 fi:) 1111 East gOth Avenue · Anchorag, .~aska 99518 * Telephone: (907)349-451'~ · FAX: (907)344-2160 06 J-39 RT. ELEV = 5~. BF. ELEV = 16.0' MAX. DEV. = 41:42 9100' MD 13-3/8", 68#/ft, L-80, BTRS. CSG. TOP OF TIE-BACK LINER 7-5/8', 29.4#/FT, NT-95-HS, FL4S 9-5/8", 47#/ft, NT80S XOTO I 9,010' NT95HS TOPOF 110,486, 'I ~ 7" LINER 9-5/8", 47#/ft, I 10,720' NT95HS, NSCC 10/18/95 I I *Hazard warning: From the Top of the Kekiktuk to the top of the 3A there is the possibility of gas & variable reservoir pressure( 5.5 - 10.1 ppg emw). TREE: ' / 5000 psi / CIW WELLHEAD: 13-5/8" / 5000 psi / McEVOY I SSSV LANDING NIPPLE I (3.813" MIN. ID) W/SSSV MIN I.D. of 2" 4-1/2", 12.6#/ft, L-80-13 Chrome, TDS TUBING GAS LIFT MANDRELS (CAMCO KMBG-M W/1.00" POCKET, BK LATCH) NO. TVD-SS MD-BRT #51 5,793' I 5,854' #417,~36' I 7,798' #31 8,55~' I 9,198' #21 9,2,~' 1 10,117' 4-1/2" "X" NIPPLE ~ (3.813' ID) I I 4-1/2" / 7" Liner Top Packer PBTD (top of float collar & cement) should be at least 100' below the OWC (10200' TVDSS). 4-1/2" Production Liner DATE, REV. BY COMMENTS ENDICOTT WELL 4-06A / Q-30 APl NO: 50-029- COMPLETION DIAGRAM BP EXPLORATION, INC. ]~ STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMMISSION ~ APPLICATION FOR SUNDRY APPROVAL 1. Type ofReques~ C~ ~ ~andon [] Suspend [] Plugging [] Time Extension [] Perforate ~ iter Casing [] Repair Well [] Pull Tubing [] Vadance [] Other ~ Change Approved Program [] Operation Shutdown [] Re-Enter Suspended Well [] Stimulate Plug Back for Sidetrack 2. Name of Operator 5. Type of well: 6. Datum Elevation (DF or KB) BP Exploration (Alaska) Inc. [] Development KBE = 55.13' [] Exploratory 7. Unit or Property Name 3. Address [] Stratigraphic Duck Island Unit/Endicott P.O. Box 196612, Anchorage, Alaska 99519-6612 [] Service 4. Location of well at surface 8. Well Number 4-06/Q-32 SDI 2701' SNL, 836' WEL, SEC. 8, T11N, R17E 9. Permit Number At top of productive interval 87-43 42' SNL, 2374' WEL, SEC. 8, T11N, R17E 10. APl Number At effective depth 50-029-21723 5034' SNL, 2425' WEL, SEC. 5, T11N, R17E 11. Field and Pool At total depth Endicott Field / Endicott Pool 4985' SNL, 2431' WEL, SEC. 5, T11N, R17E 12. Present well condition summary Total depth: measured 11700' feet Plugs (measured) Sand fill at 11,079' to 11,608' true vertical 1058o' BKB feet Effective depth: measured 11608' feet Junk (measured) true vertical 10503' BKB feet Casing Length Size Cemented MD TVD Structural BKB BKB Conductor 122' 30" Driven 161' 161' Surface 2459' 13-3/8" 4260 c.f. Permafrost Cmt 2500' 2496' Intermediate 10681' 9-5/8" 575 c.f. Class 'G' 10720' 9771' Production 5268' 7-5/8" 333 c.f. Class 'G' 5218'-10486' 4908'-9584' · Liner 1214' 7" 476 c.f. Class 'G' 10486'-11700' 9584'-10580' Perforation depth: measured 11026'-11046', 11076'-11128', 10964'-10978' (All squeezed) 10924'-10944', 10962'-10976' true vertical (Subsea) 9967'-9983', 10008'-10050', 9915'-9927' (All squeezed) Tubing (size, grade, and measured depth) 4-1/2",12.6#,L-80, 13 chrome w/4-1/2" tailpipe to 10510' Packers and SSSV (type and measured depth) 7-5/8" Packer at 10412'; 4-1/2" SSSV at 1575' 13. Attachments [] Description summary of proposal [] Detailed operations program [] BOP sketch 14. Estimated date for commencing operation 15. Status of well classifications as: October 15, 1996 16. If proposal was verbally approved [] Oil [] Gas [] Suspended Service Name of approver Date approved Contact Engineer Name/Number: Chris West, 564-5089 Prepared By Name/Number: Kathy Campoamor, 564-5122 17. I hereby certify that the foregoing is true a~i co~.~o the best of my knowledge Signed SteveShultz_ ~.,~'"~z,~./_~/ /,~~~ Title Senior Drilling' Engineer Date/O " - '~'-'" '"'~mmission Use Only / Conditions of Approval: Notify Commission so representative may witness J Approval No./4;:)~-~//4'7 Plug integrity_ BOP Test~ Location clearance __ Mechanical Integrity Test __ Subsequent form required 10- Approved by order of the Commission Commissioner Date Form 10-403 Rev. 06/15/88 Submit In Triplicate · WELL PERMIT CHECKLIST COMPANY S/Z:~ FIELD & POOL ~ ?,~ ~ INIT CLASS ~//'),,~./ ADMINISTRATION 4.. 5. 6. 7. 8. 9. 10. 11. 12. 13. ENGI~EERiNG GEOLAREA c~'? rJ UNIT# /(3 ~_~"C) .._ ON/OFF SHORE ca Permit fee attached ....................... Lease number appropriate ................... Unique wellname and number ........... w~,,o=~ in ~,d,.~r,~ ~,. ~'. '.. '. ~ ~ ......... Well Iocsted proper distance from ddg unit boundary ..... J'_Y ~N w~, ~o~t~ p~op~, ~t~= ~m o~e, we,, ......... I'.Y. Sufficient acreage available in ddlling unit. .......... I. YJN If deviated, is wellbore plat included .............. IYINr. r.N Operator only affected pa~ ................... ~YIN Operator has appropriate bond in fame ............ Permit can be issued without conservation order ...... Permit can be issued without administrative approval .... Can Permit be approved before 15-day wall ........ REMARKS ' G~:OLOGY' APPR DA 14. Conductor string provided ................... Y N 15. Surface ca~ng protects all known USDWs .......... Y N /'-~-'~- 16. CMT vol adequate to circulate on conductor & surf csg .... Y N 17. CMT vol adequate to fie-in long s~ng to surf csg ....... Y 18. CMT will cover all known productive horizons ......... .~N 19. Casing designs adequate for C, T, B & permaJrost. ..... 20. Adequate tankage or reserve pit. ............... ~ N 21. If a re-drill, has a 10-403 for abndnmnt been approved .... ~) N ..~' ~ ~ P ~ ~ ¢5; ~" 22. Adequate wellbore separation proposed ............ q_~ N ' dj 23. If diverter required, is it adequate ................ --Y-~',b',~J,~ 24. Ddlling fluid program schematic & equip list adequate .... Y~ N 25. BOPEs adequate ........................ ~ N 26. BOPE press rating adequate; test to ,~o-Z>'-b psig. ~ N 27. Choke manifold complies w/APl RP-53 (May 84) ....... 28. Work will occur wi~out operation shutdown .......... ~ N 29. Is presence of H2S gas probable ............... ~ N 30. Permit can be issued w/o hydrogen sulfide measures ..... Y 31. Dat~ presented on potential overpressure zones ....... Y 32. Seismic analysis of shallow gas zones ............. _ .~.N. 33. Seabed condition survey (if off-shore) ........... .x/fY 34. Co~ name/phone for weekly progress repo~ ...../.. Y 1exploratory ontyJ / GEOLOGY: ENGINEERING: COMMISSION: ~P~ E~EW~ff~:~,I~ DwJ~-'~. JDH ,-~..~J~ JDN "'-' TAB ~7'~,q ".'-Z,,. ........ Comments/Instructions: HOW,,Ij~ - A:~--ORMS'chekl'~ rev 4,,96 Well HistorY File APPENDIX Information of detailed nature that is not particularly germane to the Well Permitting Process but is part of the history file. To improve the readability of the Well History file and to simplify finding information, information of this nature is accumulated at the end of the file under APPENDIX. No special effort has been made to chronologically organize this category of information. RECEIVED *****'~****~.~****.~************-k * ~S~ COMPUTING CE~ER . ............................ ....... SC~ERGER . ............................ COMPANY NAME : BP EXPLORATION WELL NAME : 4-06A/Q-30 FIELD NAME : DUCK ISLAND UNIT-ENDICOTT SDI BOROUGH : NORTH SLOPE STATE : ALASKA API NUMBER : 500292172301 REFERENCE NO : 96387 LIS Tape Verification Listing Schlumberger Alaska Computing Center 5-MAR-1997 15:23 PAGE: **** REEL HEADER **** SERVICE NAME : EDIT DATE : 97/03/ 5 ORIGIN · FLIC REEL NAME : 96387 CONTINUATION # : PREVIOUS REEL : COf4~ENT . BP EXPLORATION, 4-O6A/Q-30,DUCK IS. ENDICOTT, 50-029-21723-01 **** TAPE HEADER **** SERVICE NAME : EDIT DATE : 97/03/ 5 ORIGIN : FLIC TAPE NAME . 96387 CONTINUATION # : 1 PREVIOUS TAPE : COb94ENT : BP EXPLORATION, 4-O6A/Q-30,DUCK IS. ENDICOTT, 50-029-21723-01 TAPE HEADER ENDICOTT SDI OPEN HOLE WIRELINE LOGS WELL NAME: API NUMBER: OPERATOR: LOGGING COMPANY: TAPE CREATION DATE: JOB DATA JOB NUMBER: LOGGING ENGINEER: OPERATOR WITNESS: SURFACE LOCATION RUN1 96387 E. Bartz P. Barker SECTION: TOWNSHIP: RANGE: FNL: FSL: FEL: FWL: ELEVATION (FT FROM MSL O) KELLY BUSHING: DERRICK FLOOR: GROUND LEVEL: WELL CASING RECORD 1ST STRING 2ND STRING 4-06A/Q-30 500292172301 BP Exploration SCHLUMBERGER WELL SERVICES 5-MAR-97 RUN 2 RUN 3 8 liN 17E 2578 836 56.00 56.00 14.10 OPEN HOLE CASING DRILLERS BIT SIZE (IN) SIZE (IN) DEPTH (FT) 6.000 7.000 10803.0 LIS Tape Verification Listing Schlumberger Alaska Computing Center 5-MAR-1997 15:23 3RDSTRING PRODUCTION STRING REMARKS: CONTAINED HEREIN IS THE DATA ACQUIRED ON BP EXPLORATION WELL 4-06A/Q-30. ALL TOOLS RUN IN COMBINATION BY TLC. $ $ PAGE: **** FILE HEADER **** FILE NAME : EDIT .001 SERVICE : FLIC VERSION : O01CO1 DATE : 97/03/ 5 MAX REC SIZE : 1024 FILE TYPE : LO LAST FILE : FILE HEADER FILE NUMBER: 1 EDITED OPEN HOLE MAIN PASS All tool strings; Depth shifted and clipped curves; all runs merged; no cased hole data. DEPTH INCREMENT: O . 5000 FILE SUB~CzARY LDWG TOOL CODE .............. AIT BCS SDN CNT $ BASELINE CURVE FOR SHIFTS: CR CURVE SHIFT DATA (MEASURED DEPTH) START DEPTH STOP DEPTH ..................... 12221.0 10815.0 12178.0 10796.0 12208.0 10796.0 12194.0 10796.0 BASELINE DEPTH .............. 88888. O 12181.5 12173.0 12160.0 12154.0 12138.0 12113.5 12106.0 12101 5 12091 5 12083 5 12074 0 12055 5 12042 0 12035 0 12032.0 .......... EQUIVALENT UNSHIFTED DEPTH .......... AIT BCS SDN CNT ............................ 88890.5 88890.5 88890.5 88890.5 12184.0 12184.0 12184.0 12184.0 12177.0 12177.0 12177.0 12177.0 12163.5 12163.5 12163.5 12163.5 12157.0 12157.0 12157.0 12157.0 12140.0 12140.0 12140.0 12140.0 12116.5 12116.5 12116.5 12116.5 12108.0 12108.0 12108.0 12108.0 12103.5 12103.5 12103.5 12103.5 12094.0 12094.0 12094.0 12094.0 12086.5 12086.5 12086.5 12086.5 12078.5 12078.5 12078.5 12078.5 12059.0 12059.0 12059.0 12059.0 12046.0 12046.0 12046.0 12046.0 12038.0 12038.0 12038.0 12038.0 12034.5 12034.5 12034.5 12034.5 LIS Tape Verification Listing Schlumberger Alaska Computing Center 5-MAR-1997 15:23 PAGE: 12024.0 12012.5 11994.5 11972.5 11941.5 11925.0 11919.0 11909.0 11890.0 11880.5 11875.5 11857.0 11831.0 11822.0 11819.0 11790.0 11780.0 11771.5 11737.5 11718.0 11695.5 11681.0 11655.0 11624.0 11608.0 11597.0 11583.5 11563.0 11545.0 11508.0 11486.0 11452.5 11394.5 11352.5 11340.0 11335.0 11322.5 11303.5 11277.0 11228.5 11217.5 11175 5 11170 5 11161 0 11135 0 11125 0 11110 5 11102 0 11083 0 11069 0 11059 5 11052 5 11048 0 11035 0 11034 0 12028.5 12017.0 11998.5 11979.0 11946.5 11931.0 11925.0 11915.5 11897.0 11885.5 11882.5 11862.0 11836.0 11828.0 11823.5 11795.5 11786.0 11777.0 11741.0 11721.5 11699.5 11685.0 11659.5 11629.0 11612.5 11601.5 11588.0 11566.0 11547.5 11514.0 11493.0 11459.5 11400.0 11359.0 11345.5 11341.0 11328.5 11309.0 11282.5 11236.0 11222.0 11182.5 11177.5 11167.0 11142.0 11131.0 11116.0 11108.0 11091 5 11076 0 11069 0 11061 5 11054 0 11041 0 11036 5 12028.5 12017.0 11998.5 11979.0 11946.5 11931.0 11925.0 11915.5 11897.0 11885.5 11882.5 11862.0 11836.0 11828.0 11823 5 11795 5 11786 0 11777 0 11741 0 11721 5 11699 5 11685.0 11659.5 11629.0 11612.5 11601.5 11588.0 11566.0 11547.5 11514.0 11493.0 11459.5 11400.0 11359.0 11345.5 11341.0 11328.5 11309.0 11282.5 11236.0 11222.0 11182.5 11177.5 11167.0 11142.0 11131.0 11116.0 11108.0 11091.5 11076.0 11069.0 11061.5 11054.0 11041.0 11036.5 12028.5 12017.0 11998.5 11979.0 11946.5 11931.0 11925.0 11915.5 11897.0 11885.5 11882.5 11862.0 11836.0 11828.0 11823.5 11795.5 11786.0 11777.0 11741.0 11721.5 11699.5 11685.0 11659.5 11629.0 11612.5 11601.5 11588.0 11566.0 11547.5 11514.0 11493.0 11459.5 11400.0 11359.0 11345.5 11341.0 11328.5 11309.0 11282.5 11236.0 11222.0 11182.5 11177.5 11167.0 11142.0 11131.0 11116.0 11108.0 11091.5 11076.0 11069.0 11061.5 11054.0 11041.0 11036.5 12028.5 12017.0 11998.5 11979.0 11946.5 11931.0 11925.0 11915.5 11897.0 11885.5 11882.5 11862.0 11836.0 11828.0 11823.5 11795.5 11786.0 11777.0 11741.0 11721.5 11699.5 11685.0 11659.5 11629.0 11612.5 11601.5 11588.0 11566.0 11547.5 11514.0 11493 0 11459 5 11400 0 11359 0 11345 5 11341 0 11328 5 11309 0 11282 5 11236.0 11222.0 11182.5 11177.5 11167.0 11142.0 11131.0 11116.0 11108.0 11091.5 11076.0 11069.0 11061.5 11054.0 11041.0 11036.5 LIS Tape Verification Listing Schlumberger Alaska Computing Center 5-MAR-1997 15:23 PAGE: 11023.5 11022.0 11020.5 11018.0 11014.0 11004.0 10999.0 10994.5 10987.5 10963.5 10947.0 10929.5 10922.5 10914.5 10910.5 10903.5 10898.0 10891.5 10886.0 10876.0 10834.0 10826.0 10824.0 10815.5 10802.5 10793.5 10783.5 10755.0 100.0 $ MERGED DATA SOURCE LDWG TOOL CODE $ REMARKS: 11024.5 11023.0 11022.0 11021.0 11018.0 11010.0 11003.5 10998.0 10992.5 10971.0 10954.5 10935.5 10929.0 10920.5 10911.5 10905.0 10898.0 10891.5 10883.5 10874.5 10839.5 10833.0 10830 5 10824 0 10812 5 10802 0 10791 0 10762 0 107.0 11024.5 11024.5 11024.5 11023.0 11023.0 11023.0 11022.0 11022.0 11022.0 11021 . 0 11021 . 0 11021 . 0 11018.0 11018.0 11018.0 11010.0 11010.0 11010.0 11003.5 11003.5 11003.5 10998.0 10998.0 10998.0 10992.5 10992.5 10992.5 10971.0 10971.0 10971.0 10954.5 10954.5 10954.5 10935.5 10935.5 10935.5 10929.0 10929.0 10929.0 10920.5 10920.5 10920.5 10911.5 10911.5 10911.5 10905.0 10905.0 10905.0 10898.0 10898.0 10898.0 10891.5 10891.5 10891.5 10883.5 10883.5 10883.5 10874.5 10874.5 10874.5 10839.5 10839.5 10839.5 10833.0 10833.0 10833.0 10830.5 10830.5 10830.5 10824.0 10824.0 10824.0 10812.5 10812.5 10812.5 10802.0 10802.0 10802.0 10791 . 0 10791 . 0 10791.0 10762.0 10762.0 10762.0 107.0 107.0 107.0 RUN NO. PASS NO. MERGE TOP MERGE BASE THIS FILE CONTAINS THE CLIPPED AND DEPTH CORRECTED DATA FOR THE ARRAY INDUCTION TOOL (AIT), BOREHOLE COMPENSATED SONIC (BCS), AND PLATFORM EXPRESS LITHO DENSITY (SDN), COMPENSATE NEUTRON (CNT) TOOLS. ALL CURVES WERE DEPTH CORRECTED TO A BASE GA~94A RAY PROVIDED BY BP EXPLORATION. THE DATA IN THIS FILE WAS ACQUIRED ONLY OVER THE OPEN-HOLE SECTION OF THIS LOGGING RUN. $ LIS FORMAT DATA LIS Tape Verification Listing Schlumberger Alaska Computing Center 5-MAR-1997 15:23 PAGE: ** DATA FORMAT SPECIFICATION RECORD ** ** SET TYPE - 64EB ** TYPE REPR CODE VALUE 1 66 0 2 66 0 3 73 156 4 66 1 5 66 6 73 7 65 8 68 0.5 9 65 FT 11 66 6 12 68 13 66 0 14 65 FT 15 66 68 16 66 1 0 66 0 ** SET TYPE - CHAN ** NAME SERVUNIT SERVICE API API API API FILE NUMB NUMB SIZE REPR PROCESS ID ORDER # LOG TYPE CLASS MOD NUMB SAMP ELEM CODE (HEX) DEPT FT 645084 O0 000 O0 0 1 1 1 4 68 0000000000 SP AIT MV 645084 O0 000 O0 0 1 1 1 4 68 0000000000 GR BCS GAPI 645084 O0 000 O0 0 1 1 1 4 68 0000000000 TENS AIT LB 645084 O0 000 O0 0 1 1 1 4 68 0000000000 TEND AIT LB 645084 O0 000 O0 0 1 1 1 4 68 0000000000 MRES AIT OPff4M645084 O0 000 O0 0 1 1 1 4 68 0000000000 MTEMAIT DEGF 645084 O0 000 O0 0 1 1 1 4 68 0000000000 DEV AIT DEG 645084 O0 000 O0 0 1 1 1 4 68 0000000000 CNTC CNT CPS 645084 O0 000 O0 0 1 1 1 4 68 0000000000 CFTC CNT CPS 645084 O0 000 O0 0 1 1 1 4 68 0000000000 FCNT CNT CPS 645084 O0 000 O0 0 1 1 1 4 68 0000000000 NCNT CNT CPS 645084 O0 000 O0 0 1 1 1 4 68 0000000000 CRAT CNT 645084 O0 000 O0 0 1 1 1 4 68 0000000000 NRAT CNT 645084 O0 000 O0 0 1 1 1 4 68 0000000000 NPHI CNT PU-S 645084 O0 000 O0 0 1 1 i 4 68 0000000000 CPHI CNT PU-S 645084 O0 000 O0 0 1 1 1 4 68 0000000000 DT BCS US/F 645084 O0 000 O0 0 1 1 1 4 68 0000000000 CALl SDN IN 645084 O0 000 O0 0 1 1 1 4 68 0000000000 DRHO SDN G/C3 645084 O0 000 O0 0 1 1 1 4 68 0000000000 PEF SDN BN/E 645084 O0 000 O0 0 1 1 1 4 68 0000000000 RHOB SDN G/C3 645084 O0 000 O0 0 1 1 1 4 68 0000000000 MSFL SDN OH~M645084 O0 000 O0 0 1 1 1 4 68 0000000000 MINVSDN OH~M 645084 O0 000 O0 0 1 1 1 4 68 0000000000 f~NOR SDN OHMM 645084 O0 000 O0 0 1 1 1 4 68 0000000000 AOiO AIT OH~M645084 O0 000 O0 0 1 1 1 4 68 0000000000 A020 AIT 0H~4645084 O0 000 O0 0 1 1 1 4 68 0000000000 LIS Tape Verification Listing Schlumberger Alaska Computing Center 5-MAR-1997 15:23 PAGE: NAME SERV UNIT SERVICE API API API API FILE NUMB NUMB SIZE REPR PROCESS ID ORDER # LOG TYPE CLASS MOD NUA~ SAMP ELE~ CODE (HEX) A030 AIT OH~4 645084 O0 000 O0 0 1 1 1 4 68 0000000000 A060 AIT OH~ 645084 O0 000 O0 0 1 1 1 4 68 0000000000 A090 AIT 0P~4~645084 O0 000 O0 0 1 1 1 4 68 0000000000 ATiO AIT 0H~4~645084 O0 000 O0 0 1 1 1 4 68 0000000000 AT20 AIT 0H~645084 O0 000 O0 0 1 1 1 4 68 0000000000 AT30 AIT 0H~414 645084 O0 000 O0 0 1 1 1 4 68 0000000000 AT60 AIT 0H~4~645084 O0 000 O0 0 1 1 1 4 68 0000000000 AT90 AIT OH~4~ 645084 O0 000 O0 0 1 1 1 4 68 0000000000 AFiO AIT 0H~i~645084 O0 000 O0 0 1 1 1 4 68 0000000000 AF20 AIT OH~I4 645084 O0 000 O0 0 1 1 1 4 68 0000000000 AF30 AIT OH~q 645084 O0 000 O0 0 1 1 1 4 68 0000000000 AF60 AIT OHT4~ 645084 O0 000 O0 0 1 1 1 4 68 0000000000 AF90 AIT OH~4~ 645084 O0 000 O0 0 1 1 1 4 68 0000000000 * * DA TA * * DEPT. 12221.000 SP.AIT -999.250 GR.BCS -999.250 TENS.AIT TEND.AIT 1193.109 ~i~ES.AIT 0.034 MTEM. AIT 194.576 DEV. AIT CNTC. CNT -999.250 CFTC. CNT -999.250 FCNT. CNT -999.250 NCNT. CNT CRAT. CNT -999.250 NRAT. C~ -999.250 NPHI.CNT -999.250 CPHI.CNT DT.BCS -999.250 CAL1.SDN -999.250 DRHO. SDN -999.250 PEF. SDN RHOB.SDN -999.250 MSFL.SDN -999.250 MINV. SDN -999.250 fvlNOR.SDN AOiO.AIT 1950.000 AO20.AIT 1950.000 AO30.AIT 6.886 AO60.AIT AO90.AIT 14.997 ATiO.AIT 1950.000 AT20.AIT 1950.000 AT30.AIT AT60.AIT 8.539 AT90.AIT 11.442 AFiO.AIT 1950.000 AF20.AIT AF30.AIT 1.483 AF60.AIT 4.057 AF90.AIT 122.669 DEPT. TEND . A I T CNTC. CNT CRA T. CNT DT. BCS RHOB. SDN AO10. AIT AO90.AIT AT60. AIT AF30. AIT 10796.000 1110 624 3013 042 1 752 63 000 3 093 -999 250 -999 250 -999.250 -999.250 SP.AIT -999.250 GR.BCS 49.607 TENS.AIT ~!~ES.AIT 0.034 MTEM. AIT 185.857 DEV. AIT CFTC. CNT 1737.892 FCNT. CNT 1596.601 NCNT. CNT NRAT. CNT 1.774 NPHI.CNT 17.458 CPHI.CNT CAL1.SDN 6.240 DRHO. SDN 0.120 PEF. SDN MSFL.SDN 0.484 MINV. SDN 0.474 f4NOR.SDN AO20.AIT -999.250 AO30.AIT -999.250 AO60.AIT AT10. AIT -999. 250 AT20. AIT - 999. 250 AT30. AIT AT90.AIT -999.250 AFiO.AIT -999.250 AF20.AIT AF60.AIT -999.250 AF90.AIT -999.250 2218.000 -999.250 -999.250 -999.250 -999.250 -999.250 6.517 2.936 1950.000 894.000 38.210 2983.553 17.334 9.727 0.379 -999.250 -999.250 -999.250 ** END OF DATA ** .. LIS Tape Verification Listing Schlumberger Alaska Computing Center 5-MAR-1997 15:23 PAGE: **** FILE TRAILER **** FILE NAME : EDIT .001 SERVICE : FLIC VERSION : O01CO1 DATE : 97/03/ 5 MAX REC SIZE : 1024 FILE TYPE : LO LAST FILE : **** FILE HEADER **** FILE NAME : EDIT .002 SERVICE ' FLIC VERSION · O01CO1 DATE : 97/03/ 5 MAX REC SIZE : 1024 FILE TYPE : LO LAST FILE : FILE HEADER FILE NUMBER: 2 EDITED CASED HOLE MAIN PASS Depth shifted and clipped curves for open hole logs run into casing. PASS NUMBER: 2 DEPTH INCREMENT: 0.5000 FILE SUMMARY LDWG TOOL CODE START DEPTH ......................... CNT 10796.0 $ BASELINE CURVE FOR SHIFTS: GR CURVE SHIFT DATA (MEASURED DEPTH) BASELINE DEPTH .............. 88888.0 10793.5 10783.5 10755.0 100.0 $ REMARKS: STOP DEPTH 10724.0 .......... EQUIVALENT UNSHIFTED DEPTH .......... CNT 88816.5 10802.0 10791.0 10762.0 107.0 THIS FILE CONTAINS THE CLIPPED AND DEPTH CORRECTED DATA FOR THE PLATFORM EXPRESS COMPENSATED NEUTRON (CNT) TOOL. ALL CURVES WERE DEPTH CORRECTED TO A BASE GAMMA RAY PROVIDED BY BP EXPLORATION. THE DATA IN THIS FILE WAS ACQUIRED ONLY OVER THE CASED HOLE SECTION OF THIS LOGGING RUN. LIS Tape Verification Listing Schlumberger Alaska Computing Center 5-MAR-1997 15:23 PAGE: LIS FORMAT DATA ** DATA FORMAT SPECIFICATION RECORD ** ** SET TYPE - 64EB ** TYPE REPR CODE VALUE 1 66 0 2 66 0 3 73 48 4 66 1 5 66 6 73 7 65 8 68 0.5 9 65 FT 11 66 21 12 68 13 66 0 14 65 FT 15 66 68 16 66 1 0 66 i ** SET TYPE - CHAN ** NAME SERV UNIT SERVICE API API API API FILE NUH~ NUMB SIZE REPR PROCESS ID ORDER # LOG TYPE CLASS MOD NIIBiB SAMP ELEM CODE (HEX) O0 000 O0 0 2 1 1 4 68 0000000000 DEPT FT 645084 TENS AIT LB 645084 O0 000 O0 0 2 1 1 4 68 0000000000 TEND AIT LB 645084 O0 000 O0 0 2 1 1 4 68 0000000000 GRCH BCS GAPI 645084 O0 000 O0 0 2 1 1 4 68 0000000000 CNTC CNT CPS 645084 O0 000 O0 0 2 1 1 4 68 0000000000 CFTC CNT CPS 645084 O0 000 O0 0 2 1 1 4 68 0000000000 FCNT CNT CPS 645084 O0 000 O0 0 2 1 1 4 68 0000000000 NCNT CNT CPS 645084 O0 000 O0 0 2 1 1 4 68 0000000000 CRAT CNT 645084 O0 000 O0 0 2 1 1 4 68 0000000000 NRAT CNT 645084 O0 000 O0 0 2 1 1 4 68 0000000000 NPHI CNT PU-S 645084 O0 000 O0 0 2 1 1 4 68 0000000000 CPHI CNT PU-S 645084 O0 000 O0 0 2 1 1 4 68 0000000000 ** DATA ** DEPT. 10796.000 TENS.AIT 894.000 TEND.AIT 1110.624 GRCH. BCS CNTC. CNT 3013.042 CFTC. CNT 1737.892 FCNT. CNT 1596.601 NCNT. CNT CRAT. CNT 1.752 NRAT. CNT 1.774 NPHI.CNT 17.458 CPHI. CNT 49.607 2983.553 17.334 LIS Tape Verification Listing Schlumberger Alaska Computing Center 5-MAR-1997 15:23 PAGE: DEPT. 10724. 000 TENS.AIT CNTC. CNT 1020. 059 CFTC. CNT CRAT. CNT 3. 600 NRAT. CNT 394.000 TEND.AIT 294.885 FCNT. CN~f 3.905 NPHI.CNT 1092. 680 GRCH. BCS 270. 162 NCNT. CNT 47.994 CPHI.CNT 111.133 961.711 43.966 ** END OF DATA ** **** FILE TRAILER **** FILE NAME : EDIT .002 SERVICE · FLIC VERSION · O01CO1 DATE . 97/03/ 5 MAX REC SIZE : 1024 FILE TYPE : LO LAST FILE : **** FILE HEADER **** FILE NAME : EDIT .003 SERVICE : FLIC VERSION · O01CO1 DATE : 97/03/ 5 MAX REC SIZE : 1024 FILE TYPE : LO LAST FILE : RUN NUMBER: TOOL STRING NUMBER: PASS NUMBER: DEPTH INCREMENT: FILE SU~9~ARY FILE HEADER FILE ~BER 3 RAW OPEN HOLE MAIN PASS Curves and log header data for each run and tool string in separate files; Tool String #1 fo Sadlerochit run presented first (primary depth control string used to depth shift the Sadler interval) followed by files for other main pass tool strings per run. 1 1 2 0.5000 VENDOR TOOL CODE START DEPTH STOP DEPTH ..................................... AIT 12222.0 10796.0 BHC 12222.0 10796.0 PEX 12222.0 10796.0 $ LOG HEADER DATA DATE LOGGED: SOFTWARE VERSION: TIME CIRCULATION ENDED: 28-NOV-96 8B0-538 2000 27-NOV-96 LIS Tape Verification Listing Schlumberger Alaska Computing Center 5-MAR-1997 15:23 PAGE: 10 TIME LOGGER ON BOTTOM: TD DRILLER (FT) : TD LOGGER (FT) : TOP LOG INTERVAL (FT) : BOTTOM LOG INTERVAL (FT) : LOGGING SPEED (FPHR): TOOL STRING (TOP TO BOTTOM) VENDOR TOOL CODE TOOL TYPE AMS AUX. MEAS. SONDE BHC COMP. SONIC PEX PLATFORM EXPRESS AIT ARRAY INDUCTION TOOL $ 1538 28-NOV-96 12687.0 12222.0 10704.0 12220.0 1800.0 TOOL NUMBER AMS - A SLS-WA 1498 HILTB-DTB AIT-H 122 BOREHOLE AND CASING DATA OPEN HOLE BIT SIZE (IN): DRILLERS CASING DEPTH (FT): LOGGERS CASING DEPTH (FT) : 6. 000 10803.0 10796.0 BOREHOLE CONDITIONS MUD TYPE: MUD DENSITY (LB/G): MUD VISCOSITY (S) : MUD PH: FLUID LOSS (C3): MAXIMUM RECORDED TEMPERATURE (DEGF) : RESISTIVITY (OH~M) AT TEMPERATURE (DEGF) : MUD AT MEASURED TEMPERATURE (MT): MUD AT BOTTOM HOLE TEMPERATURE (BHT) : MUD FILTRATE AT (MT): MUD FILTRATE AT (BHT).' MUD CAKE AT (MT): MUD CAKE AT (BHT) : SHEARDR I I~N- N 10.40 54.0 8.7 196.0 0.057 66.0 0.049 66.0 0.069 66.0 NEUTRON TOOL TOOL TYPE (EPITHERMAL OR THERMAL): MATRIX: MATRIX DENSITY: HOLE CORRECTION (IN): THERMAL SANDSTONE 2.65 TOOL STANDOFF (IN): 0.5 REMARKS: ALL TOOLS RUN IN COMBINATION + TLC (AIT-TLD-CNT-GR-BHC). TWO .5" STANDOFFS RUN ON INDUCTION, FIVE .5" STANDOFFS RUN ON SONIC. TWO TOOL TURNERS USED TO ORIENT THE DENSITY & NEUTRON TOOL (PAD DOWN). INDUCTION ANOMALOUS DUE TO HIGH CHLORIDES (127, O00/RM = .057 OHRM) . BOREHOLE CONDITIONS WELL OUT OF AIT OPERATING RANGE. AIT MAIN PASS = DOWN LOG / REPEAT = UP LOG. AIT REPEAT POOR DUE TO BOREHOLE ENVIRONME2iT & DOWN VS. UP LOG. AIT MAIN PASS IS DOWN DUE TO LOSS OF VALID SIGNAL ABOVE 11790'. LOSS OF SIGNAL POSSIBLY DUE TO METAL STANDOFF WHICH SLID DOWN ONTO THE SONDE. LOW INDUCTION SIGNAL @ LIS Tape Verification Listing Schlumberger Alaska Compu ting Center 5-MAR-1997 15:23 PAGE: 11 12193' PROBABLY DUE TO METAL IN HOLE (STANDOFF ?). THIS IS THE RAW MAIN PASS PEX/AIT/BHC/AMS DATA SAMPLED AT 0.5' RATE; OPEN HOLE ONLY. $ LIS FORMAT DATA ** DATA FORMAT SPECIFICATION RECORD ** ** SET TYPE - 64EB ** TYPE REPR CODE VALUE 1 66 0 2 66 0 3 73 184 4 66 1 5 66 6 73 7 65 8 68 0.5 9 65 FT 11 66 5 12 68 13 66 0 14 65 FT 15 66 68 16 66 1 0 66 1 ** SET TYPE - CHAN ** NAME SERV UNIT SERVICE API API API API FILE NUMB NUMB SIZE REPR PROCESS ID ORDER # LOG TYPE CLASS MOD NUMB SAMP ELEM CODE (HEX) DEPT FT 645084 O0 000 O0 0 3 1 1 4 68 0000000000 SP AIT MV 645084 O0 000 O0 0 3 1 1 4 68 0000000000 GR BHC GAPI 645084 O0 000 O0 0 3 1 1 4 68 0000000000 TENS AIT LB 645084 O0 000 O0 0 3 1 1 4 68 0000000000 HTEN AIT LB 645084 O0 000 O0 0 3 1 1 4 68 0000000000 MRES AIT OH~4M 645084 O0 000 O0 0 3 1 1 4 68 0000000000 MTEMAIT DEGF 645084 O0 000 O0 0 3 1 1 4 68 0000000000 GDEVAIT DEG 645084 O0 000 O0 0 3 1 1 4 68 0000000000 CNTC PEX CPS 645084 O0 000 O0 0 3 1 1 4 68 0000000000 CFTC PEX CPS 645084 O0 000 O0 0 3 1 1 4 68 0000000000 RCFT PEX CPS 645084 O0 000 O0 0 3 1 1 4 68 0000000000 RCNT PEX CPS 645084 O0 000 O0 0 3 1 1 4 68 0000000000 TNRA PEX 645084 O0 000 O0 0 3 1 1 4 68 0000000000 RTNR PEX 645084 O0 000 O0 0 3 1 1 4 68 0000000000 TNPH PEX PU 645084 O0 000 O0 0 3 1 1 4 68 0000000000 NPHI PEX PU 645084 O0 000 O0 0 3 1 1 4 68 0000000000 r. LIS Tape Verification Listing Schlumberger Alaska Computing Center 5-MAR-1997 15:23 PAGE: 12 NAME SERV UNIT SERVICE API API API API FILE NUFiB NUMB SIZE REPR PROCESS ID ORDER # LOG TYPE CLASS MOD NUMB SAMP ELEM CODE (HEX) O0 000 O0 0 3 1 1 4 68 0000000000 NPOR PEX PU 645084 DT BHC US/F 645084 O0 000 O0 0 3 1 1 4 68 0000000000 TT1 BHC US 645084 O0 000 O0 0 3 1 1 4 68 0000000000 TT2 BHC US 645084 O0 000 O0 0 3 1 1 4 68 0000000000 TT3 BHC US 645084 O0 000 O0 0 3 1 1 4 68 0000000000 TT4 BHC US 645084 O0 000 O0 0 3 1 1 4 68 0000000000 HCAL PEX IN 645084 O0 000 O0 0 3 1 1 4 68 0000000000 RHOZ PEX G/C3 645084 O0 000 O0 0 3 1 1 4 68 0000000000 HDRA PEX G/C3 645084 O0 000 O0 0 3 1 1 4 68 0000000000 PEFZ PEX 645084 O0 000 O0 0 3 1 1 4 68 0000000000 DPHZ PEX PU 645084 O0 000 O0 0 3 1 1 4 68 0000000000 H~IN PEX OH~I 645084 O0 000 O0 0 3 1 1 4 68 0000000000 HI, NOPEX OH~M 645084 O0 000 O0 0 3 1 1 4 68 0000000000 RXOZ PEX OH~q 645084 O0 000 O0 0 3 1 1 4 68 0000000000 RX08 PEX OP~ 645084 O0 000 O0 0 3 1 1 4 68 0000000000 AOiO AIT 0H~645084 O0 000 O0 0 3 1 1 4 68 0000000000 A020 AIT OP~4~ 645084 O0 000 O0 0 3 1 1 4 68 0000000000 A030 AIT 0H~645084 O0 000 O0 0 3 1 1 4 68 0000000000 A060 AIT OH~M645084 O0 000 O0 0 3 1 1 4 68 0000000000 A090 AIT OH~I 645084 O0 000 O0 0 3 1 1 4 68 0000000000 ATiO AIT OH~M 645084 O0 000 O0 0 3 1 1 4 68 0000000000 AT20 AIT OH~ 645084 O0 000 O0 0 3 1 1 4 68 0000000000 AT30 AIT OH~k~ 645084 O0 000 O0 0 3 1 1 4 68 0000000000 AT60 AIT OH~ 645084 O0 000 O0 0 3 1 1 4 68 0000000000 AT90 AIT OH~f645084 O0 000 O0 0 3 1 1 4 68 0000000000 AFIO AIT OH~M 645084 O0 000 O0 0 3 1 1 4 68 0000000000 AF20 AIT 0H~645084 O0 000 O0 0 3 1 1 4 68 0000000000 AF30 AIT 0H~94 645084 O0 000 O0 0 3 1 1 4 68 0000000000 AF60 AIT OH~ 645084 O0 000 O0 0 3 1 1 4 68 0000000000 AF90 AIT 0H~645084 O0 000 O0 0 3 1 1 4 68 0000000000 ** DATA ** DEPT. 12222.000 SP.AIT -103.188 GR.BHC 112.535 TENS.AIT HTEN. AIT 1091.967 MRES.AIT 0.034 MTEM. AIT 194.576 GDEV. AIT CNTC. PEX 1907.705 CFTC. PEX 1305.045 RCFT. PEX 1096.663 RCNT. PEX TNRA.PEX 1.494 RTArR.PEX 1.623 TNPH. PEX 13.253 NPHI.PEX NPOR.PEX 12.878 DT.BHC 58.600 TT1.BHC 413.200 TT2.BHC TT3.BHC 431.200 TT4.BHC 324.000 HCAL.PEX 6.327 RHOZ.PEX HDRA.PEX -999.250 PEFZ.PEX -999.250 DPHZ.PEX 60721.211 H~IN. PEX H~NO. PEX 0.184 POfOZ.PEX 0.359 RXO8.PEX 0.360 AOiO.AIT AO20.AIT 1950. 000 A030 .AIT 7.168 AO60.AIT 7. 427 AO90.AIT ATiO.AIT 1950. 000 AT20.AIT 1950. 000 AT30.AIT 2. 954 AT60.AIT AT90.AIT 11. 774 AFiO.AIT 1950. 000 AF20.AIT 1950. 000 AF30.AIT AF60.AIT 3.980 AF90.AIT 126.963 2648. 000 -999. 250 1769. 526 13.510 286. 000 -999. 250 0.166 1950. 000 18. 828 8. 781 1. 473 LIS Tape Verification Listing Schlumberger Alaska Computing Center 5-MAR-1997 15:23 PAGE: 13 DEPT. HTEN. AIT CNTC. PEX TNRA. PEX NPOR. PEX TT3. BHC HDRA. PEX HMNO. PEX A02 O. AIT AT10. AIT AT90. AIT AF60. AIT 10796.000 1110.624 3013.042 1.752 16.552 416.000 0 120 0 379 0 238 1950 000 0 300 5 604 SP. AIT MRES. AIT CFTC. PEX R TNR. PEX DT. BHC TT4. BHC PEFZ. PEX RXOZ. PEX A03 O. AIT AT20.AIT AFl O . AIT AF90. AIT -59. 000 GR. BHC O. 034 MTEM. AIT 1737. 892 RCFT. PEX 1.774 TNPH. PEX 63 . 000 TT1 .BHC 295. 600 HCAL. PEX 9. 727 DPHZ.PEX O. 484 RX08. PEX O. 171 A060. AIT O. 442 AT30.AIT 1950. 000 AF20.AIT 192. 623 49. 607 TENS.AIT 185.857 GDEV. AIT 1596. 601 RCNT. PEX 17.334 NPHI. PEX 420. 400 TT2. BHC 6.240 RHOZ . PEX -26. 860 HMIN. PEX O. 491 AOIO .AIT O. 160 A090 .AIT O. 311 AT60. AIT O. 991 AF30. AIT 894. 000 38.210 2983. 553 17. 458 294. 800 3. 093 O. 474 2. 405 0.164 0.310 O. 843 ** END OF DATA ** **** FILE TRAILER **** FILE NAME : EDIT .003 SERVICE : FLIC VERSION ' O01CO1 DATE : 97/03/ 5 MAX REC SIZE : 1024 FILE TYPE : LO LAST FILE : **** FILE HEADER **** FILE NAME : EDIT .004 SERVICE : FLIC VERSION : O01CO1 DATE : 97/03/ 5 MAX REC SIZE : 1024 FILE TYPE : LO LAST FILE : FILE HEADER FILE NUMBER 4 RAW OPEN HOLE MAIN PASS Curves and log header data for each run and tool string in separate files; Tool String #1 fo Sadlerochit run presented first (primary depth control string used to depth shift the Sadler interval) followed by files for other main pass tool strings per run. 1 1 2 0.2500 RUN NUMBER: TOOL STRING NUMBER: PASS NUMBER: DEPTH INCREMENT: FILE SUM~N~Y VENDOR TOOL CODE START DEPTH STOP DEPTH ..................................... AIT 12222.0 10796.0 LIS Tape Verification Listing Schlumberger Alaska Computing Center 5-MAR-1997 15:23 PAGE: 14 BHC PEX $ LOG HEADER DATA 12222.0 12222.0 10796.0 10796.0 DATE LOGGED: SOFTWARE VERSION: TIME CIRCULATION ENDED: TIME LOGGER ON BOTTOM: TD DRILLER (FT) : TD LOGGER (FT) : TOP LOG INTERVAL (FT) : BOTTOM LOG INTERVAL (FT) : LOGGING SPEED (FPHR): 28-NOV-96 8B0-538 2000 27-NOV-96 1538 28-NOV-96 12687.0 12222.0 10704.0 12220.0 1800.0 TOOL STRING (TOP TO BOTTOM) VENDOR TOOL CODE TOOL TYPE AMS AUX. MEAS. SONDE BHC COMP. SONIC PEX PLATFORM EXPRESS AIT ARRAY INDUCTION TOOL $ TOOL NUMBER AMS - A SLS-WA 1498 HILTB-DTB AIT-H 122 BOREHOLE AND CASING DATA OPEN HOLE BIT SIZE (IN): DRILLERS CASING DEPTH (FT): LOGGERS CASING DEPTH (FT) : 6.000 10803.0 10796.0 BOREHOLE CONDITIONS MUD TYPE: MUD DENSITY (LB/G): MUD VISCOSITY (S) : MUD PH: FLUID LOSS (C3): MAXIMUM RECORDED TEMPERATURE (DEGF) : RESISTIVITY (OHMM) AT TEMPERATURE (DEGF) : MUD AT MEASURED TEMPERATURE (MT): MUD AT BOTTOM HOLE TEMPERATURE (BHT) : MUD FILTRATE AT (MT): MUD FILTRATE AT (BHT) : MUD CAKE AT (MT): MUD CAKE AT (BHT) : SHEARDR I LN- N 10.40 54.0 8.7 196.0 O. 057 66.0 0.049 66.0 0.069 66.0 NEUTRON TOOL TOOL TYPE (EPITHERMAL OR THERMAL): MATRIX: MATRIX DENSITY: HOLE CORRECTION (IN): THERMAL SANDSTONE 2.65 TOOL STANDOFF (IN): 0.5 REMARKS: ALL TOOLS RUN IN COMBINATION + TLC (AIT-TLD-CNT-GR-BHC). TWO .5" STANDOFFS RUN ON INDUCTION, FIVE .5" STANDOFFS RUN ON SONIC. TWO TOOL TUPOVERS USED TO ORIENT THE LIS Tape Verification Listing Schlumberger Alaska Computing Center 5-MAR-1997 15:23 PAGE: 15 DENSITY & NEUTRON TOOL (PAD DOWN). INDUCTION ANOMALOUS DUE TO HIGH CHLORIDES (127, O00/RM = . 057 OH~M) . BOREHOLE CONDITIONS WELL OUT OF AIT OPERATING RANGE. AIT MAIN PASS = DOWN LOG / REPEAT = UP LOG. AIT REPEAT POOR DUE TO BOREHOLE ENVIRONMENT & DOWN VS. UP LOG. AIT MAIN PASS IS DOWN DUE TO LOSS OF VALID SIGNAL ABOVE 11790'. LOSS OF SIGNAL POSSIBLY DUE TO METAL STANDOFF WHICH SLID DOWN ONTO THE SONDE. LOW INDUCTION SIGNAL @ 12193' PROBABLY DUE TO METAL IN HOLE (STANDOFF ?). THIS IS THE RAW, OPEN HOLE MAIN PASS AIT DATA ACQUIRED AT 0.25' SAMPLE RATE. $ LIS FORMAT DATA ** DATA FORMAT SPECIFICATION RECORD ** ** SET TYPE - 64EB * * .............................. TYPE REPR CODE VALUE .............................. 1 66 0 2 66 0 3 73 64 4 66 1 5 66 6 73 7 65 8 68 0.25 9 65 FT 11 66 16 12 68 13 66 0 14 65 FT 15 66 68 16 66 1 0 66 1 ** SET TYPE - CHAN ** NAME SERV UNIT SERVICE API API API API FILE NUMB NUMB SIZE REPR PROCESS ID ORDER # LOG TYPE CLASS MOD NUMB SAMP EL~ CODE (HEX) DEPT FT 645084 O0 000 O0 0 4 1 1 4 68 0000000000 AOiO AIT 0H~4~645084 O0 000 O0 0 4 1 1 4 68 0000000000 A020 AIT OH~4M 645084 O0 000 O0 0 4 1 1 4 68 0000000000 A030 AIT OH~4M 645084 O0 000 O0 0 4 1 1 4 68 0000000000 A060 AIT 0H~94645084 O0 000 O0 0 4 1 1 4 68 0000000000 A090 AIT 0H~645084 O0 000 O0 0 4 1 1 4 68 0000000000 ATiO AIT Otff4M645084 O0 000 O0 0 4 1 1 4 68 0000000000 AT20 AIT OHI~M645084 O0 000 O0 0 4 1 1 4 68 0000000000 LIS Tape Verification Listing Schlumberger Alaska Computing Center 5-MAR-1997 15:23 PAGE: 16 NAME SERV UNIT SERVICE API API API API FILE NUMB NUMB SIZE REPR PROCESS ID ORDER # LOG TYPE CLASS MOD NUMB SAMP ELE~ CODE (HEX) AT30 AIT OH~ 645084 O0 000 O0 0 4 1 1 4 68 0000000000 AT60 AIT OH~I 645084 O0 000 O0 0 4 1 1 4 68 0000000000 AT90 AIT OH~ 645084 O0 000 O0 0 4 1 1 4 68 0000000000 AFiO AIT OH~ 645084 O0 000 O0 0 4 1 1 4 68 0000000000 AF20 AIT OH~I 645084 O0 000 O0 0 4 1 1 4 68 0000000000 AF30 AIT OH~4~ 645084 O0 000 O0 0 4 1 1 4 68 0000000000 AF60 AIT OH~M 645084 O0 000 O0 0 4 1 1 4 68 0000000000 AF90 AIT OH~I 645084 O0 000 O0 0 4 1 1 4 68 0000000000 ** DATA ** DEPT. 12222. 000 AOiO.AIT 1950. 000 AO20.AIT 1950. 000 AO30.AIT AO60.AIT 7. 427 AO90.AIT 18. 828 ATiO.AIT 1950. 000 AT20.AIT AT30.AIT 2. 954 AT60.AIT 8. 781 AT90.AIT 11. 774 AFiO.AIT AF20.AIT 1950. 000 AF30.AIT 1. 473 AF60.AIT 3. 980 AF90.AIT 7.168 1950.000 1950.000 126.963 ** END OF DATA ** **** FILE TRAILER **** FILE NAME : EDIT .004 SERVICE : FLIC VERSION ' O01CO1 DATE : 97/03/ 5 MAX REC SIZE : 1024 FILE TYPE : LO LAST FILE : **** FILE HEADER **** FILE NAME : EDIT .005 SERVICE : FLIC VERSION : O01CO1 DATE · 97/03/ 5 MAX REC SIZE : 1024 FILE TYPE : LO LAST FILE : FILE HEADER FILE NUMBER 5 RAW OPEN HOLE MAIN PASS Curves and log header data for each run and tool string in separate files; Tool String #1 fo Sadlerochit run presented first (primary depth control string used to depth shift the Sadler interval) followed by files for other main pass tool strings per run. LIS Tape Verification Listing Schlumberger Alaska Computing Center 5-MAR-1997 15:23 PAGE: 17 RUN NUMBER: 1 TOOL STRING NUMBER: 1 PASS NUMBER: 2 DEPTH INCREMENT: O. 1667 FILE SUMMARY VENDOR TOOL CODE START DEPTH STOP DEPTH AIT 12222.0 10796.0 BHC 12222.0 10796.0 PEX 12222.0 10796.0 $ LOG HEADER DATA DATE LOGGED: SOFTWARE VERSION: TIME CIRCULATION ENDED: TIME LOGGER ON BOTTOM: TD DRILLER (FT) : TD LOGGER (FT) : TOP LOG INTERVAL (FT) : BOTTOM LOG INTERVAL (FT) '. LOGGING SPEED (FPHR) : TOOL STRING (TOP TO BOTTOM) VENDOR TOOL CODE TOOL TYPE AMS AUX. MEAS. SONDE BHC COMP. SONIC PEX PLATFORM EXPRESS AIT ARRAY INDUCTION TOOL $ BOREHOLE AND CASING DATA OPEN HOLE BIT SIZE (IN): DRILLERS CASING DEPTH (FT) : LOGGERS CASING DEPTH (FT) : BOREHOLE CONDITIONS MUD TYPE: MUD DENSITY (LB/G): MUD VISCOSITY (S) : MUD PH: FLUID LOSS (C3): MAXIMUM RECORDED TEMPERATURE (DEGF) : RESISTIVITY (OH~4M) AT TEMPERATURE (DEGF) : MUD AT MEASURED TEMPERATURE (MT): MUD AT BOTTOM HOLE TEMPERATURE (BHT) : MUD FILTRATE AT (MT): MUD FILTRATE AT (BHT) : MUD CAKE AT (MT): MUD CAKE AT (BHT) : NEUTRON TOOL TOOL TYPE (EPITHERMAL OR THERMAL): 28-NOV-96 8B0-538 2000 27-NOV-96 1538 28-NOV-96 12687.0 12222.0 10704.0 12220.0 1800.0 TOOL NUMBER ........... SLS-WA 1498 HILTB-DTB AIT-H 122 6.000 10803.0 10796.0 SHEARDRILN- N 10.40 54.0 8.7 196.0 O. 057 66.0 0.049 66.0 0.069 66.0 THERMAL LIS Tape Verification Listing Schlumberger Alaska Computing Center 5-MAR-1997 15:23 PAGE: 18 MATRIX: SANDSTONE MATRIX DENSITY: 2.65 HOLE CORRECTION (IN): TOOL STANDOFF (IN): O. 5 REMARKS: ALL TOOLS RUN IN COMBINATION + TLC (AIT-TLD-CNT-GR-BHC). TWO .5" STANDOFFS RUN ON INDUCTION, FIVE .5" STANDOFFS RUN ON SONIC. TWO TOOL TURNERS USED TO ORIENT THE DENSITY & NEUTRON TOOL (PAD DOWN). INDUCTION ANOMALOUS DUE TO HIGH CHLORIDES (127, O00/RM = .057 OHHM) . BOREHOLE CONDITIONS WELL OUT OF AIT OPERATING RANGE. AIT MAIN PASS = DOWN LOG / REPEAT = UP LOG. AIT REPOT POOR DUE TO BOREHOLE ENVIRONMENT & DOWN VS. UP LOG. AIT MAIN PASS IS DOWN DUE TO LOSS OF VALID SIGNAL ABOVE 11790'. LOSS OF SIGNAL POSSIBLY DUE TO METAL STANDOFF WHICH SLID DOWN ONTO THE SONDE. LOW INDUCTION SIGNAL @ 12193' PROBABLY DUE TO METAL IN HOLE (STANDOFF ?). THIS IS THE RAW, MAIN PASS PEX/BHC DATA ACQUIRED AT 0.1667' SAMPLE RATE; OPEN HOLE ONLY. $ LIS FORMAT DATA ** DATA FORMAT SPECIFICATION RECORD ** ** SET TYPE - 64EB ** TYPE REPR CODE VALUE 1 66 0 2 66 0 3 73 80 4 66 1 5 66 6 73 7 65 8 68 0.166 9 65 FT 11 66 12 12 68 13 66 0 14 65 FT 15 66 68 16 66 1 0 66 1 LIS Tape Verification Listing Schlumberger Alaska Computing Center 5-MAR-1997 15:23 PAGE: 19 ** SET TYPE - CHAN ** NAME SERV UNIT SERVICE API API API API FILE NUMB NUMB SIZE REPR PROCESS ID ORDER # LOG TYPE CLASS MOD NUMB SAMP ELEM CODE (HEX) DEPT FT 645084 O0 000 O0 0 5 1 1 4 68 0000000000 RHOZ PEX G/C3 645084 O0 000 O0 0 5 1 1 4 68 0000000000 HDRA PEX G/C3 645084 O0 000 O0 0 5 1 1 4 68 0000000000 PEFZ PEX 645084 O0 000 O0 0 5 1 1 4 68 0000000000 DPHZ PEX PU 645084 O0 000 O0 0 5 1 1 4 68 0000000000 HMIN PEX OPiM~ 645084 O0 000 O0 0 5 1 1 4 68 0000000000 HI4NO PEX 014~ 645084 O0 000 O0 0 5 1 1 4 68 0000000000 RXOZ PEX 014~ 645084 O0 000 O0 0 5 1 1 4 68 0000000000 RX08 PEX OHlVk~645084 O0 000 O0 0 5 1 1 4 68 0000000000 HCNT PEX CPS 645084 O0 000 O0 0 5 1 1 4 68 0000000000 HCFT PEX CPS 645084 O0 000 O0 0 5 1 1 4 68 0000000000 HGR BHC GAPI 645084 O0 000 O0 0 5 1 1 4 68 0000000000 RHFT PEX CPS 645084 O0 000 O0 0 5 1 1 4 68 0000000000 RHNT PEX CPS 645084 O0 000 O0 0 5 1 1 4 68 0000000000 HTNP PEX PU 645084 O0 000 O0 0 5 1 1 4 68 0000000000 HNPO PEX PU 645084 O0 000 O0 0 5 1 1 4 68 0000000000 TT1 BHC US 645084 O0 000 O0 0 5 1 1 4 68 0000000000 TT2 BHC US 645084 O0 000 O0 0 5 1 1 4 68 0000000000 TT3 BHC US 645084 O0 000 O0 0 5 1 1 4 68 0000000000 TT4 BHC US 645084 O0 000 O0 0 5 1 1 4 68 0000000000 ** DATA ** DEPT. 12222.000 RHOZ.PEX -999.250 PiDRA.PEX -999.250 PEFZ.PEX DPHZ.PEX 60721.211 HMIN. PEX 0.166 HNINO.PEX 0.184 RXOZ.PEX RXO8.PEX 0.360 HCNT. PEX 1907.705 HCFT. PEX 1305.045 HGR.BHC RHFT. PEX 1096.663 RHNT. PEX 1769.526 HTNP.PEX 13.253 HNPO. PEX TT1.BHC 413.200 TT2.BHC 286.000 TT3.BHC 431.200 TT4.BHC -999.250 0.359 112.535 12.878 324.000 ** END OF DATA ** **** FILE TRAILER **** FILE NAME : EDIT .005 SERVICE : FLIC VERSION . O01CO1 DATE : 97/03/ 5 MAX REC SIZE : 1024 FILE TYPE : LO LAST FILE : LIS Tape Verification Listing Schlumberger Alaska Computing Center 5-MAR-1997 15:23 PAGE: 2O **** FILE HEADER **** FILE NAME : EDIT .006 SERVICE : FLIC VERSION : O01CO1 DATE : 97/03/ 5 MAX REC SIZE : 1024 FILE TYPE : LO LAST FILE : RUN NUMBER: TOOL STRING NUMBER: PASS NUMBER: DEPTH INCREMENT: FILE SU~94ARY FILE HEADER FILE NUMBER 6 RAW OPEN HOLE MAIN PASS Curves and log header data for each run and tool string in separate files; Tool String #1 fo Sadlerochit run presented first (primary depth control string used to depth shift the Sadler interval) followed byfiles for other main pass tool strings per run. 1 1 2 0.0833 VENDOR TOOL CODE START DEPTH STOP DEPTH AIT 12222.0 10796.0 BHC 12222.0 10796.0 PEX 12222.0 10796.0 $ LOG HEADER DATA DATE LOGGED: SOFTWARE VERSION: TIME CIRCULATION ENDED: TIME LOGGER ON BOTTOM: TD DRILLER (FT) : TD LOGGER (FT) : TOP LOG INTERVAL (FT) : BOTTOM LOG INTERVAL (FT) : LOGGING SPEED (FPHR) : TOOL STRING (TOP TO BOTTOM) VENDOR TOOL CODE TOOL TYPE AMS AUX. 14EAS. SONDE BHC COMP. SONIC PEX PLATFORM EXPRESS AIT ARRAY INDUCTION TOOL $ BOREHOLE AND CASING DATA OPEN HOLE BIT SIZE (IN): DRILLERS CASING DEPTH (FT) : LOGGERS CASING DEPTH (FT) : 28-NOV-96 8B0-538 2000 27-NOV-96 1538 28-NOV-96 12687.0 12222.0 10704.0 12220.0 1800.0 TOOL NUMBER ........... SLS-WA 1498 HILTB-DTB AIT-H 122 6.000 10803.0 10796.0 LIS Tape Verification Listing Schlumberger Alaska Computing Center 5-MAR-1997 15:23 PAGE: 21 BOREHOLE CONDITIONS MUD TYPE: MUD DENSITY (LB/G): MUD VISCOSITY (S) : MUD PH: FLUID LOSS (C3): MAXIMUM RECORDED TEMPERATURE (DEGF) : RESISTIVITY (OPHir) AT TEMPERATURE (DEGF) .. MUD AT MEASURED TEMPERATURE (MT): MUD AT BOTTOM HOLE TEMPERATURE (BHT) : MUD FILTRATE AT (MT): MUD FILTRATE AT (BHT) : MUD CAKE AT (MT): MUD CAKE AT (BHT) : SHEARDRILN-N 10.40 54.0 8.7 196.0 O. 057 66.0 O. 049 66.0 O. 069 66.0 NEUTRON TOOL TOOL TYPE (EPITHERMAL OR THERMAL): MATRIX: MATRIX DENSITY: HOLE CORRECTION (IN): THERMAL SANDSTONE 2.65 TOOL STANDOFF (IN): O. 5 REMARKS: ALL TOOLS RUN IN COMBINATION + TLC (AIT-TLD-CNT-GR-BHC). TWO .5" STANDOFFS RUN ON INDUCTION, FIVE .5" STANDOFFS RUN ON SONIC. TWO TOOL TURNERS USED TO ORIENT THE DENSITY & NEUTRON TOOL (PAD DOWN). INDUCTION ANOMALOUS DUE TO HIGH CHLORIDES (127, O00/RM = . 057 OHHM) . BOREHOLE CONDITIONS WELL OUT OF AIT OPERATING RANGE. AIT MAIN PASS = DOWN LOG / REPEAT = UP LOG. AIT REPEAT POOR DUE TO BOREHOLE ENVIRONMENT & DOWN VS. UP LOG. AIT MAIN PASS IS DOWN DUE TO LOSS OF VALID SIGNAL ABOVE 11790'. LOSS OF SIGNAL POSSIBLY DUE TO METAL STANDOFF WHICH SLID DOWN ONTO THE SONDE. LOW INDUCTION SIGNAL 12193 ' PROBABLY DUE TO METAL IN HOLE (STANDOFF ?) . THIS IS THE RAW, OPEN HOLE MAIN PASS PEX DATA ACQUIRED AT O. 0833' SAMPLE RATE. $ LIS FORMAT DATA ** DATA FORMAT SPECIFICATION RECORD ** ** SET TYPE - 64EB ** TYPE REPR CODE VALUE 1 66 0 2 66 0 3 73 8 4 66 1 LIS Tape Verification Listing Schlumberger Alaska Computing Center 5-MAR-1997 15:23 PAGE: 22 TYPE REPR CODE VALUE 5 66 6 73 7 65 8 68 0.083 9 65 FT 11 66 128 12 68 13 66 0 14 65 FT 15 66 68 16 66 1 0 66 1 .............................. ** SET TYPE - CHAN ** ....................................................................................... NAME SERV UNIT SERVICE API API API API FILE NTglV~ NUMB SIZE REPR PROCESS ID ORDER # LOG TYPE CLASS MOD NUMB SAMP ELE~ CODE (HEX) DEPT FT 645084 O0 000 O0 0 6 1 1 4 68 0000000000 HCAL PEX IN 645084 O0 000 O0 0 6 1 1 4 68 0000000000 ** DATA ** DEPT. 12222.000 HCAL.PEX 6.327 ** END OF DATA ** **** FILE TRAILER **** FILE NAME : EDIT .006 SERVICE : FLIC VERSION · O01CO1 DATE · 97/03/ 5 MAX REC SIZE : 1024 FILE TYPE : LO LAST FILE : **** FILE HEADER **** FILE NAME : EDIT .007 SERVICE : FLIC VERSION · O01CO1 DATE : 97/03/ 5 MAX REC SIZE : 1024 FILE TYPE : LO LAST FILE : LIS Tape Verification Listing Schlumberger Alaska Computing Center 5-MAR-1997 15:23 PAGE: 23 FILE HEADER FILE NUMBER 7 RAW OPEN HOLE REPEAT PASSES Curves and log header data for each pass, tool string, and run in separate files. RUN NUMBER: 1 TOOL STRING NUMBER: 1 PASS NUMBER: 1 DEPTH INCREMENT: 0.5000 FILE SUMMARY VENDOR TOOL CODE START DEPTH ........................... AIT 12049.0 PEX 11790.0 BHC 11790.0 $ LOG HEADER DATA DATE LOGGED: SOFTWARE VERSION: TIME CIRCULATION ENDED TIME LOGGER ON BOTTOM: TD DRILLER (FT) : TD LOGGER (FT) : TOP LOG INTERVAL (FT) : BOTTOM LOG INTERVAL (FT) LOGGING SPEED (FPHR) : STOP DEPTH .......... 11800.0 11514.0 11514.0 TOOL STRING (TOP TO BOTTOM) VENDOR TOOL CODE TOOL TYPE AMS AUX. MEAS. SONDE BHC COMP. SONIC PEX PLATFORM EXPRESS AIT ARRAY INDUCTION TOOL $ BOREHOLE AND CASING DATA OPEN HOLE BIT SIZE (IN) DRILLERS CASING DEPTH (FT) LOGGERS CASING DEPTH (FT) BOREHOLE CONDITIONS MUD TYPE: MUD DENSITY (LB/G): MUD VISCOSITY (S) '. MUD PH: FLUID LOSS (C3): MAXIMUM RECORDED TEMPERATURE (DEGF) : RESISTIVITY (OHMM) AT TEMPERATURE (DEGF) : MUD AT MEASURED TEMPERATURE (MT): MUD AT BOTTOM HOLE TEMPERATURE (BHT) : MUD FILTRATE AT (MT): MUD FILTRATE AT (BHT) : MUD CAKE AT (MT): 28-NOV-96 8B0-538 2000 27-NOV-96 1538 28-NOV-96 12687.0 12222.0 10704.0 12220.0 1800.0 TOOL NCTMBER ........... AMS - A SLS-WA 1498 HILTB-DTB AIT-H 122 6. 000 10803.0 10796.0 SHEARDR I LN- N 10.40 54.0 8.7 196.0 O. 057 66.0 0.049 66.0 O. 069 66.0 LIS Tape Verification Listing Schlumberger Alaska Computing Center 5-MAR-1997 15:23 PAGE: 24 MUD CAKE AT (BHT) : NEUTRON TOOL TOOL TYPE (EPITHERMAL OR THERMAL): MATRIX: MATRIX DENSITY: HOLE CORRECTION (IN): THERMAL SANDSTONE 2.65 TOOL STANDOFF (IN): 0.5 REMARKS: ALL TOOLS RUN IN COMBINATION + TLC (AIT-TLD-CNT-GR-BHC). TWO .5" STANDOFFS RUN ON INDUCTION, FIVE .5" STANDOFFS RUN ON SONIC. TWO TOOL TURNERS USED TO ORIENT THE DENSITY & NEUTRON TOOL (PAD DOWN) . INDUCTION ANOMALOUS DUE TO HIGH CHLORIDES (127, O00/RM = . 057 OHHM) . BOREHOLE CONDITIONS WELL OUT OF AIT OPERATING RANGE. AIT MAIN PASS = DOWN LOG / REPEAT = UP LOG. AIT REPEAT POOR DUE TO BOREHOLE ENVIRONMENT & DOWN VS. UP LOG. AIT MAIN PASS IS DOWN DUE TO LOSS OF VALID SIGNAL ABOVE 11790'. LOSS OF SIGNAL POSSIBLY DUE TO METAL STANDOFF WHICH SLID DOWN ONTO THE SONDE. LOW INDUCTION SIGNAL @ 12193' PROBABLY DUE TO METAL IN HOLE (STANDOFF ?). THIS IS THE RAW REPEAT DATA ACQUIRED AT 0.5' SAMPLE RATE. TENS, HTEN, DEVI, GR, FIRES, AND MTEM CURVES HAVE BEEN MERGED AT 11800'. $ LIS FORMAT DATA * * DATA FORMAT SPECIFICATION RECORD * * * * SET TYPE - 64EB ** TYPE REPR CODE VALUE 1 66 0 2 66 0 3 73 72 4 66 1 5 66 6 73 7 65 8 68 0.5 9 65 FT 11 66 14 12 68 13 66 0 14 65 FT 15 66 68 16 66 1 0 66 1 LIS Tape Verification Listing Schlumberger Alaska Computing Center 5-MAR-1997 15:23 PAGE: 25 * * SET TYPE - CHAN ** NAME SERV UNIT SERVICE API API API API FILE NUMB NUMB SIZE REPR PROCESS ID ORDER # LOG TYPE CLASS MOD NUMB SAMP ELEM CODE (HEX) DEPT FT 645084 O0 000 O0 0 7 1 1 4 68 SP AIT MV 645084 O0 000 O0 0 7 1 1 4 68 GR AIT GAPI 645084 O0 000 O0 0 7 1 1 4 68 TENS AIT LB 645084 O0 000 O0 0 7 1 1 4 68 HTEN AIT LB 645084 O0 000 O0 0 7 1 1 4 68 MRES AIT OHNk4 645084 O0 000 O0 0 7 1 1 4 68 MTEMAIT DEGF 645084 O0 000 O0 0 7 1 1 4 68 GDEV AIT DEG 645084 O0 000 O0 0 7 1 1 4 68 CNTC PEX CPS 645084 O0 000 O0 0 7 1 1 4 68 CFTC PEX CPS 645084 O0 000 O0 0 7 1 1 4 68 RCFT PEX CPS 645084 O0 000 O0 0 7 1 1 4 68 RCNT PEX CPS 645084 O0 000 O0 0 7 1 1 4 68 TNRA PEX 645084 O0 000 O0 0 7 1 1 4 68 RTNR PEX 645084 O0 000 O0 0 7 1 1 4 68 TNPH PEX PU 645084 O0 000 O0 0 7 1 1 4 68 NPHI PEX PU 645084 O0 000 O0 0 7 1 1 4 68 NPOR PEX PU 645084 O0 000 O0 0 7 1 1 4 68 DT BHC US/F 645084 O0 000 O0 0 7 1 1 4 68 0000000000 0000000000 0000000000 0000000000 0000000000 0000000000 0000000000 0000000000 0000000000 0000000000 0000000000 0000000000 0000000000 0000000000 0000000000 0000000000 0000000000 0000000000 ** DATA ** DEPT. 12049.500 SP.AIT 0.000 GR.AIT 78.163 TENS.AIT HTEN. AIT 1030.371 MNES.AIT 0.035 MTEM. AIT 194.708 GDEV. AIT CNTC. PEX -999.250 CFTC. PEX -999.250 RCFT. PEX -999.250 RCNT. PEX TNRA.PEX -999.250 RTNR.PEX -999.250 TNPH. PEX -999.250 NPHI.PEX NPOR.PEX -999.250 DT. BHC -999.250 DEPT. 11514.000 SP.AIT -999.250 GR.AIT 86.837 TENS.AIT HTEN. AIT 665.876 ~RES.AIT 0.034 MTEM. AIT 191.517 GDEV. AIT CNTC. PEX 3396.116 CFTC. PEX 1944.945 RCFT. PEX 1356.846 RCNT. PEX TNRA.PEX 1.778 RTN-R.PEX 1.964 TNPH. PEX 17.306 NPHI.PEX NPOR.PEX 16.272 DT.BHC 63.200 2550.000 -999.250 -999.250 -999.250 1763.000 87.712 2724.719 17.589 ** END OF DATA ** **** FILE TRAILER **** FILE NAME : EDIT .007 SERVICE : FLIC VERSION · O01CO1 DATE : 97/03/ 5 MAX REC SIZE : 1024 FILE TYPE : LO LAST FILE : LIS Tape Verification Listing Schlumberger Alaska Computing Center 5-MAR-1997 15:23 PAGE: 26 **** FILE HEADER **** FILE NAME : EDIT .008 SERVICE : FLIC VERSION : O01CO1 DATE : 97/03/ 5 MAX REC SIZE : 1024 FILE TYPE : LO LAST FILE : FILE HEADER FILE NUMBER 8 RAW OPEN HOLE REPEAT PASSES Curves and log header data for each pass, tool string, and run in separate files. RUN NUMBER: 1 TOOL STRING NUMBER: 1 PASS NUMBER: 1 DEPTH INCREMENT: O . 2500 FILE SUMMARY VENDOR TOOL CODE START DEPTH STOP DEPTH AIT 12049.0 11800.0 PEX 11790.0 11514.0 BHC 11790.0 11514.0 $ LOG HEADER DATA DATE LOGGED: 28-NOV-96 SOFTWARE VERSION: 8B0-538 TIME CIRCULATION ENDED: 2000 27-NOV-96 TIME LOGGER ON BOTTOM: 1538 28-NOV-96 TD DRILLER (FT) : 12687.0 TD LOGGER (FT) : 12222.0 TOP LOG INTERVAL (FT) : 10704.0 BOTTOM LOG INTERVAL (FT) : 12220.0 LOGGING SPEED (FPHR): 1800.0 TOOL STRING (TOP TO BOTTOM) VENDOR TOOL CODE TOOL TYPE TOOL NUMBER AMS AUX. MEAS. SONDE AMS-A BHC COMP. SONIC SLS-WA 1498 PEX PLATFORM EXPRESS HILTB-DTB AIT ARRAY INDUCTION TOOL AIT-H 122 $ BOREHOLE AND CASING DATA OPEN HOLE BIT SIZE (IN) '. DRILLERS CASING DEPTH (FT) : LOGGERS CASING DEPTH (FT) : BOREHOLE CONDITIONS 6.000 10803.0 10796.0 LIS Tape Verification Listing Schlumberger Alaska Computing Center 5-MAR-1997 15:23 PAGE: 27 MUD TYPE: MUD DENSITY (LB/G): MUD VISCOSITY (S) : MUD PH: FLUID LOSS (C3): MAXIMUM RECORDED TEMPERATURE (DEGF): RESISTIVITY (OH~) AT TEMPERATURE (DEGF) : MUD AT MEASURED TEMPERATURE (MT): MUD AT BOTTOM HOLE TEMPERATURE (BHT): MUD FILTRATE AT (MT): MUD FILTRATE AT (BHT) : MUD CAKE AT (MT): MUD CAKE AT (BHT) : NEUTRON TOOL TOOL TYPE (EPITHERMAL OR THERMAL): MATRIX: MATRIX DENSITY: HOLE CORRECTION (IN): SHEARDRILN-N 10.40 54.0 8.7 196.0 O. 057 66.0 O. 049 66.0 0.069 66.0 THERMAL SANDSTONE 2.65 TOOL STANDOFF (IN): O. 5 REMARKS: ALL TOOLS RUN IN COMBINATION + TLC (AIT-TLD-CNT-GR-BHC). TWO .5" STANDOFFS RUN ON INDUCTION, FIVE .5" STANDOFFS RUN ON SONIC. TWO TOOL TURNERS USED TO ORIENT THE DENSITY & NEUTRON TOOL (PAD DOWN). INDUCTION ANOMALOUS DUE TO HIGH CHLORIDES (127,000/RM = .057 OH~iM). BOREHOLE CONDITIONS WELL OUT OF AIT OPERATING RANGE. AIT MAIN PASS = DOWN LOG / REPEAT = UP LOG. AIT REPEAT POOR DUE TO BOREHOLE ENVIROAC4ENT & DOWN VS. UP LOG. AIT MAIN PASS IS DOWN DUE TO LOSS OF VALID SIGNAL ABOVE 11790'. LOSS OF SIGNAL POSSIBLY DUE TO METAL STANDOFF WHICH SLID DOWN ONTO THE SONDE. LOW INDUCTION SIGNAL @ 12193' PROBABLY DUE TO METAL IN HOLE (STANDOFF ?). THIS IS THE RAW REPEAT DATA ACQUIRED AT 0.25' SAMPLE RATE. $ LIS FORMAT DATA ** DATA FORMAT SPECIFICATION RECORD ** * * SET TYPE - 64EB * * TYPE REPR CODE VALUE 1 66 0 2 66 0 3 73 64 4 66 1 5 66 6 73 LIS Tape Verification Listing Schlumberger Alaska Computing Center 5-MAR-1997 15:23 PAGE: 28 TYPE REPR CODE VALUE 7 65 8 68 0.25 9 65 FT 11 66 16 12 68 13 66 0 14 65 FT 15 66 68 16 66 1 0 66 1 ** SET TYPE - CHAN ** NAME SERV UNIT SERVICE API API API API FILE NUMB NUMB SIZE REPR PROCESS ID ORDER # LOG TYPE CLASS MOD ~ SAMP ELEM CODE (HEX) DEPT FT 645084 O0 000 O0 0 8 i 1 4 68 0000000000 AOiO AIT 0h?4~645084 O0 000 O0 0 8 1 1 4 68 0000000000 A020 AIT OH~IM 645084 O0 000 O0 0 8 1 i 4 68 0000000000 A030 AIT Oh?4~ 645084 O0 000 O0 0 8 1 1 4 68 0000000000 A060 AIT 0H~4~I645084 O0 000 O0 0 8 1 1 4 68 0000000000 A090 AIT 0HI~I645084 O0 000 O0 0 8 1 1 4 68 0000000000 ATiO AIT 0I~4~645084 O0 000 O0 0 8 1 1 4 68 0000000000 AT20 AIT OHT4~ 645084 O0 000 O0 0 8 1 1 4 68 0000000000 AT30 AIT OHlV~1645084 O0 000 O0 0 8 1 1 4 68 0000000000 AT60 AIT 0P~4~4645084 O0 000 O0 0 8 1 1 4 68 0000000000 AT90 AIT OH~4~ 645084 O0 000 O0 0 8 1 1 4 68 0000000000 AFiO AIT 0H~4~4645084 O0 000 O0 0 8 1 1 4 68 0000000000 AF20 AIT 0H~4~645084 O0 000 O0 0 8 1 1 4 68 0000000000 AF30 AIT 0H~I~645084 O0 000 O0 0 8 1 1 4 68 0000000000 AF60 AIT 0Hl~4645084 O0 000 O0 0 8 1 1 4 68 0000000000 AF90 AIT 0HT~I645084 O0 000 O0 0 8 1 1 4 68 0000000000 ** DATA ** DEPT. 12049.500 AOiO.AIT 8.623 AO20.AIT 1.747 AO30.AIT AO60.AIT 2.577 Aogo.AIT 2.457 ATiO.AIT 22.837 AT20.AIT AT30.AIT 7.284 AT60.AIT 6.824 AT90.AIT 6.943 AFIO.AIT AF20.AIT 3.338 AF30.AIT 7.152 AF60.AIT 12.158 AF90.AIT DEPT. 11800.750 AOIO.AIT 7.034 AO20.AIT 1.414 AO30.AIT AO60.AIT 7.755 AO90.AIT 6.979 ATiO.AIT 27.660 AT20.AIT AT30.AIT 12.403 AT60.AIT 13.397 AT90.AIT 12.992 AFiO.AIT AF20.AIT 3.211 AF30.AIT 8.341 AF60.AIT 47.817 AF90.AIT 4.818 2.748 423.232 13.211 5. 788 1. 961 1950. 000 47. 046 ** END OF DATA ** LIS Tape Verification Listing Schlumberger Alaska Computing Center 5-MAR-1997 15:23 PAGE: 29 **** FILE TRAILER **** FILE NAME : EDIT .008 SERVICE : FLIC VERSION : O01CO1 DATE : 97/03/ 5 MAX REC SIZE : 1024 FILE TYPE : LO LAST FILE : **** FILE HEADER **** FILE NAME : EDIT .009 SERVICE : FLIC VERSION ' O01CO1 DATE . 97/03/ 5 MAX REC SIZE : 1024 FILE TYPE : LO LAST FILE : RUN NUMBER: TOOL STRING NUMBER: PASS NUMBER: DEPTH INCREMENT: FILE SUMMARY FILE HEADER FILE NUMBER 9 RAW OPEN HOLE REPEAT PASSES Curves and log header data for each pass, tool string, and run in separate files. 1 1 1 0.1667 VENDOR TOOL CODE START DEPTH STOP DEPTH AIT 12049.0 11800.0 PEX 11790.0 11514.0 BHC 11790.0 11514.0 $ LOG HEADER DATA DATE LOGGED: SOFTWARE VERSION: TIME CIRCULATION ENDED: TIME LOGGER ON BOTTOM: TD DRILLER (FT) : TD LOGGER (FT) : TOP LOG INTERVAL (FT): BOTTOM LOG INTERVAL (FT) : LOGGING SPEED (FPHR): TOOL STRING (TOP TO BOTTOM) VENDOR TOOL CODE TOOL TYPE AMS AUX. MEAS. SONDE BHC COMP. SONIC 28-NOV-96 8B0-538 2000 27-NOV-96 1538 28-NOV-96 12687.0 12222.0 10704.0 12220.0 1800.0 TOOL NUMBER SLS-WA 1498 LIS Tape Verification Listing Schlumberger Alaska Computing Center 5-MAR-1997 15:23 PAGE: 30 PEX AIT $ PLATFORM EXPRESS ARRAY INDUCTION TOOL HILTB -DTB AIT-H 122 BOREHOLE AND CASING DATA OPEN HOLE BIT SIZE (IN): DRILLERS CASING DEPTH (FT) : LOGGERS CASING DEPTH (FT) : 6. 000 10803.0 10796.0 BOREHOLE CONDITIONS MUD TYPE: MUD DENSITY (LB/G): MUD VISCOSITY (S) : MUD PH: FLUID LOSS (C3): MAXIMUM RECORDED TEMPERATURE (DEGF) : RESISTIVITY (OHF~4) AT TEMPERATURE (DEGF) : MUD AT MEASURED TEMPERATURE (MT): MUD AT BOTTOM HOLE TEMPERATURE (BHT): MUD FILTRATE AT (MT): MUD FILTRATE AT (BHT): MUD CAKE AT (MT): MUD CAKE AT (BHT) '. SHEARDR I LN- N 10.40 54.0 8.7 196.0 O. 057 66.0 O. 049 66.0 0.069 66.0 NEUTRON TOOL TOOL TYPE (EPITHBRMAL OR THERM_A~): MATRIX: MATRIX DENSITY: HOLE CORRECTION (IN): THERMAL SAArDSTONE 2.65 TOOL STANDOFF (IN): O. 5 REMARKS: ALL TOOLS RUN IN COMBINATION + TLC (AIT-TLD-CNT-GR-BHC). TWO .5" STANDOFFS RUN ON INDUCTION, FIVE .5" STANDOFFS RUN ON SONIC. TWO TOOL TURNERS USED TO ORIENT THE DENSITY & NEUTRON TOOL (PAD DOWN). INDUCTION ANOMALOUS DUE TO HIGH CHLORIDES (127,000/RM = .057 OHHM). BOREHOLE CONDITIONS WELL OUT OF AIT OPERATING RANGE. AIT MAIN PASS = DOWN LOG / REPEAT = UP LOG. AIT REPEAT POOR DUE TO BOREHOLE ENVIRONMENT & DOWN VS. UP LOG. AIT MAIN PASS IS DOWN DUE TO LOSS OF VALID SIGNAL ABOVE 11790'. LOSS OF SIGNAL POSSIBLY DUE TO METAL STANDOFF WHICH SLID DOWN ONTO THE SONDE. LOW INDUCTION SIGNAL @ 12193' PROBABLY DUE TO METAL IN HOLE (STANDOFF ?). THIS IS THE RAW REPEAT DATA ACQUIRED AT 0.1667' SAMPLE RATE. $ LIS FORMAT DATA LIS Tape Verification Listing Schlumberger Alaska Computing Center 5-MAR-1997 15:23 PAGE: 31 ** DATA FORMAT SPECIFICATION RECORD ** ** SET TYPE - 64EB ** TYPE REPR CODE VALUE 1 66 0 2 66 0 3 73 80 4 66 1 5 66 6 73 7 65 8 68 0.166 9 65 FT 11 66 12 12 68 13 66 0 14 65 FT 15 66 68 16 66 1 0 66 1 * * SET TYPE - CHAN * * NAME SERV UNIT SERVICE API API API API FILE NUMB NUMB SIZE REPR PROCESS ID ORDER # LOG TYPE CLASS MOD NUMB SAMP ELEM CODE (HEX) DEPT FT 645084 O0 000 O0 0 9 1 1 4 68 0000000000 RHOZ PEX G/C3 645084 O0 000 O0 0 9 1 1 4 68 0000000000 HDRA PEX G/C3 645084 O0 000 O0 0 9 1 1 4 68 0000000000 PEFZ PEX 645084 O0 000 O0 0 9 1 1 4 68 0000000000 DPHZ PEX PU 645084 O0 000 O0 0 9 1 1 4 68 0000000000 HMIN PEX OH~ff4645084 O0 000 O0 0 9 1 1 4 68 0000000000 HMNO PEX OH~ff4645084 O0 000 O0 0 9 1 1 4 68 0000000000 RXOZ PEX OH~M 645084 O0 000 O0 0 9 1 1 4 68 0000000000 RX08 PEX OH~4M 645084 O0 000 O0 0 9 1 1 4 68 0000000000 HCNT PEX CPS 645084 O0 000 O0 0 9 i 1 4 68 0000000000 HCFT PEX CPS 645084 O0 000 O0 0 9 1 i 4 68 0000000000 HGR BHC GAPI 645084 O0 000 O0 0 9 1 1 4 68 0000000000 RHFT PEX CPS 645084 O0 000 O0 0 9 1 1 4 68 0000000000 RHNT PEX CPS 645084 O0 000 O0 0 9 1 1 4 68 0000000000 HTNP PEX PU 645084 O0 000 O0 0 9 1 1 4 68 0000000000 HNPO PEX PU 645084 O0 000 O0 0 9 1 1 4 68 0000000000 TT1 BHC US 645084 O0 000 O0 0 9 1 1 4 68 0000000000 TT2 BHC US 645084 O0 000 O0 0 9 1 1 4 68 0000000000 TT3 BHC US 645084 O0 000 O0 0 9 1 1 4 68 0000000000 TT4 BHC US 645084 O0 000 O0 0 9 1 1 4 68 0000000000 ** DATA ** LIS Tape Verification Listing Schlumberger Alaska Computing Center 5-MAR-1997 15~3 PAGE: 32 DEPT. 11790.000 RHOZ.PEX DPHZ.PEX 60721.211 HMIN. PEX RXO8.PEX 70.329 HCNT. PEX RHFT. PEX 1894.678 RHNT. PEX TT1.BHC 430.000 TT2.BHC DEPT. 11514.334 RHOZ.PEX DPHZ.PEX 8.503 HMIN. PEX RXO8.PEX 6.154 HCNT. PEX RHFT. PEX 1318.957 RHNT. PEX TT1.BHC 432.000 TT2.BHC -999.250 HDRA.PEX 0.368 HMNO.PEX 3801.749 HCFT. PEX 3296.994 HTNP.PEX 298.800 TT3.BHC 2.510 HDRA.PEX 2.101 HMNO.PEX 3342.357 HCFT. PEX 2777.278 HTNP. PEX 290.800 TT3.BHC -999.250 PEFZ.PEX 0.542 RXOZ.PEX 2335.598 HGR.BHC 15.496 HNPO.PEX 427.200 TT4.BHC 0.007 PEFZ.PEX 1.379 RXOZ.PEX 1918.682 HGR.BHC 17.245 HNPO.PEX 436.800 TT4.BHC -999.250 44.302 28.609 14.374 299.600 2. 539 6.154 92. 337 17.509 285. 600 ** END OF DATA ** **** FILE TRAILER **** FILE NAME : EDIT .009 SERVICE · FLIC VERSION · O01CO1 DATE : 97/03/ 5 MAX REC SIZE : 1024 FILE TYPE : LO LAST FILE : **** FILE HEADER **** FILE NAME : EDIT .010 SERVICE : FLIC VERSION ' O01CO1 DATE : 97/03/ 5 MAX REC SIZE : 1024 FILE TYPE : LO LAST FILE : FILE HEADER FILE NUMBER 10 RAW OPEN HOLE REPEAT PASSES Curves and log header data for each pass, tool string, and run in separate files. RUN NUMBER: 1 TOOL STRING NUMBER: 1 PASS NUMBER: 1 DEPTH INCREMENT: 0.0833 FILE SDW~fARY VENDOR TOOL CODE START DEPTH ........................... AIT 12049.0 PEX 11790.0 BHC 11790.0 STOP DEPTH .......... 11800.0 11514.0 11514.0 LIS Tape Verification Listing Schlumberger Alaska Computing Center 5-MAR-1997 15:23 PAGE: 33 $ LOG HEADER DATA DATE LOGGED: SOFTWARE VERSION: TIME CIRCULATION ENDED: TIME LOGGER ON BOTTOM: TD DRILLER (FT) ~ TD LOGGER (FT) : TOP LOG INTERVAL (FT): BOTTOM LOG INTERVAL (FT) : LOGGING SPEED (FPHR) : 28-NOV-96 8B0-538 2000 27-NOV-96 1538 28-NOV-96 12687.0 12222.0 10704.0 12220.0 1800.0 TOOL STRING (TOP TO BOTTOM) VENDOR TOOL CODE TOOL TYPE AMS AUX. MEAS. SONDE BHC COMP. SONIC PEX PLATFORM EXPRESS AIT ARRAY INDUCTION TOOL $ TOOL NUMBER AMS - A SLS-WA 1498 HILTB-DTB AIT-H 122 BOREHOLE AND CASING DATA OPEN HOLE BIT SIZE (IN): DRILLERS CASING DEPTH (FT) : LOGGERS CASING DEPTH (FT) : 6.000 10803.0 10796.0 BOREHOLE CONDITIONS MUD TYPE: MUD DENSITY (LB/G): MUD VISCOSITY (S) : MUD PH: FLUID LOSS (C3): MAXIMUM RECORDED TEMPERATURE (DEGF) : RESISTIVITY (0H~94) AT TEMPERATURE (DEGF) : MUD AT MEASURED TEMPERATURE (MT): MUD AT BOTTOM HOLE TEMPERATURE (BHT): MUD FILTRATE AT (MT): MUD FILTRATE AT (BHT) : MUD CAKE AT (MT): MUD CAKE AT (BHT) : SHEARDRI LN- N 10.40 54.0 8.7 196.0 O. 057 66.0 0.049 66.0 0.069 66.0 NEUTRON TOOL TOOL TYPE (EPITHERMAL OR THERMAL): MATRIX: MATRIX DENSITY: HOLE CORRECTION (IN): THERMAL SANDSTONE 2.65 TOOL STANDOFF (IN): 0.5 REMARKS ALL TOOLS RUN IN COMBINATION + TLC ~IT-TLD-CNT-GR-BHC). TWO .5" STANDOFFS RUN ON INDUCTION, FIVE .5" STANDOFFS RUN ON SONIC. TWO TOOL TURNERS USED TO ORIENT THE DENSITY & NEUTRON TOOL (PAD DOWN). INDUCTION ANOMALOUS DUE TO HIGH CHLORIDES (127,000/RM= .057 OHH~). LIS Tape Verification Listing Schlumberger Alaska Computing Center 5-MAR-1997 15:23 PAGE: 34 BOREHOLE CONDITIONS WELL OUT OF AIT OPERATING RANGE. AIT MAIN PASS = DOWN LOG / REPEAT = UP LOG. AIT REPEAT POOR DUE TO BOREHOLE ENVIRONMENT & DOWN VS. UP LOG. AIT MAIN PASS IS DOWN DUE TO LOSS OF VALID SIGNAL ABOVE 11790'. LOSS OF SIGNAL POSSIBLY DUE TO METAL STANDOFF WHICH SLID DOWN ONTO THE SONDE. LOW INDUCTION SIGNAL @ 12193 ' PROBABLY DUE TO METAL IN HOLE (STANDOFF ?). THIS IS THE RAW REPEAT DATA ACQUIRED AT 0.0833' SAMPLE RATE. $ LIS FORMAT DATA ** DATA FORMAT SPECIFICATION RECORD ** ** SET TYPE- 64EB ** TYPE REPR CODE VALUE 1 66 0 2 66 0 3 73 8 4 66 1 5 66 6 73 7 65 8 68 0.083 9 65 FT 11 66 128 12 68 13 66 0 14 65 FT 15 66 68 16 66 1 0 66 1 ** SET TYPE - CHAN ** NAME SERV UNIT SERVICE API API API API FILE NUMB NUMB SIZE REPR PROCESS ID ORDER # LOG TYPE CLASS MOD ~ SAMP ELEM CODE (HEX) DEPT FT 645084 O0 000 O0 0 10 1 1 4 68 0000000000 HCAL PEX IN 645084 O0 000 O0 0 10 1 1 4 68 0000000000 ** DATA ** LIS Tape Verification Listing Schlumberger Alaska Computing Center 5-MAR-1997 15:23 PAGE: 35 DEPT. 11790.000 HCAL.PEX DEPT. 11514.084 HCAL.P~ 6.677 6.530 ** END OF DATA ** **** FILE TRAILER **** FILE NAME : EDIT .010 SERVICE : FLIC VERSION : O01CO1 DATE : 97/03/ 5 MAX REC SIZE : 1024 FILE TYPE : LO LAST FILE : **** FILE HEADER **** FILE NAME : EDIT .011 SERVICE · FLIC VERSION : O01CO1 DATE · 97/03/ 5 MAX REC SIZE : 1024 FILE TYPE : LO LAST FILE : FILE HEADER FILE NUMBER 11 RAW CASED HOLEMAIN PASS Curves and log header data for open hole logs run into casing. PASS NUMBER: 2 DEPTH INCREMENT: 0.5000 FILE SOFkZ~RY VENDOR TOOL CODE START DEPTH STOP DEPTH 10796.0 10704.0 PEX $ LOG HEADER DATA DATE LOGGED: 28 -NOV- 96 SOFTWARE VERSION: 8B0-538 TIME CIRCULATION ENDED.. 2000 27-NOV-96 TIME LOGGER ON BOTTOM: 1538 28-NOV-96 TD DRILLER (FT) : 12687.0 TD LOGGER (FT) : 12222.0 TOP LOG INTERVAL (FT) : 10704.0 BOTTOM LOG INTERVAL (FT) : 12220.0 LOGGING SPEED (FPHR) : 1800.0 LIS Tape Verification Listing Schlumberger Alaska Computing Center 5-MAR-1997 15:23 PAGE: 36 TOOL STRING (TOP TO BOTTOM) VENDOR TOOL CODE TOOL TYPE AMS AUX. MEAS. SONDE BHC COMP. SONIC PEX PLATFORM EXPRESS AIT ARRAY INDUCTION TOOL $ TOOL NUlqBER AMS-A SLS-WA 1498 HILTB-DTB AIT-H 122 BOREHOLE AND CASING DATA OPEN HOLE BIT SIZE (IN): DRILLERS CASING DEPTH (FT) : LOGGERS CASING DEPTqq (FT) : 6. 000 10803.0 10796.0 BOREHOLE CONDITIONS MUD TYPE: MUD DENSITY (LB/G): MUD VISCOSITY (S) : MUD PH: FLUID LOSS (C3): MAXIMUM RECORDED TEMPERATURE (DEGF) : RESISTIVITY (OHIP4) AT TEMPERATURE (DEGF) : MUD AT MEASURED TEMPERATURE (MT): MUD AT BOTTOM HOLE TEMPERATURE (BHT): MUD FILTRATE AT (MT): MUD FILTRATE AT (BHT) : MUD CAKE AT (MT): MUD CAKE AT (BHT) : SHEARDRI LN- N 10.40 54.0 8.7 196.0 O. 057 66.0 0.049 66.0 0.069 66.0 NEUTRON TOOL TOOL TYPE (EPITHERMAL OR THERMAL): MATRIX: MATRIX DENSITY: HOLE CORRECTION (IN): THERMAL SANDSTONE 2.65 TOOL STANDOFF (IN): 0.5 REMARKS: ALL TOOLS RUN IN COMBINATION + TLC (AIT-TLD-CNT-GR-BHC). TWO .5" STANDOFFS RUN ON INDUCTION, FIVE .5" STANDOFFS RUN ON SONIC. TWO TOOL TURNERS USED TO ORIENT THE DENSITY & NEUTRON TOOL (PAD DOWN). INDUCTION ANOMALOUS DUE TO HIGH CHLORIDES (127, O00/RM = . 057 OHHM) . BOREHOLE CONDITIONS WELL OUT OF AIT OPERATING RANGE. AIT MAIN PASS = DOWN LOG / REPEAT = UP LOG. AIT REPEAT POOR DUE TO BOREHOLE ENVIRONMENT & DOWN VS. UP LOG. AIT MAIN PASS IS DOWN DUE TO LOSS OF VALID SIGNAL ABOVE 11790'. LOSS OF SIGNAL POSSIBLY DUE TO METAL STANDOFF WHICH SLID DOWN ONTO THE SONDE. LOW INDUCTION SIGNAL @ 12193' PROBABLY DUE TO METAL IN HOLE (STANDOFF ?). THIS IS THE RAW PEX DATA ACQUIRED AT 0.5' SAMPLE RATE LOGGED UP INTO CASING. $ LIS FORMAT DATA LIS Tape Verification Listing Schlumberger Alaska Computing Center 5-MAR-1997 15:23 PAGE: 37 ** DATA FORMAT SPECIFICATION RECORD ** * * SET TYPE - 64EB ** TYPE REPR CODE VALUE 1 66 0 2 66 0 3 73 52 4 66 1 5 66 6 73 7 65 8 68 0.5 9 65 FT 11 66 19 12 68 13 66 0 14 65 FT 15 66 68 16 66 1 0 66 1 ** SET TYPE - CHAN ** NAME SERV UNIT SERVICE API API API API FILE NUMB NUMB SIZE REPR PROCESS ID ORDER # LOG TYPE CLASS MOD NUMB SAMP ELEM CODE (HEX) DEPT FT 645084 O0 000 O0 0 11 1 1 4 68 0000000000 TENS AIT LB 645084 O0 000 O0 0 11 1 1 4 68 0000000000 HTEN AIT LB 645084 O0 000 O0 0 11 1 1 4 68 0000000000 GR BHC GAPI 645084 O0 000 O0 0 11 1 1 4 68 0000000000 CNTC PEX CPS 645084 O0 000 O0 0 11 1 1 4 68 0000000000 CFTC PEX CPS 645084 O0 000 O0 0 11 1 1 4 68 0000000000 RCFT PEX CPS 645084 O0 000 O0 0 11 1 1 4 68 0000000000 RCNT PEX CPS 645084 O0 000 O0 0 11 1 1 4 68 0000000000 TNRA PEX 645084 O0 000 O0 0 11 1 1 4 68 0000000000 RTNR PEX 645084 O0 000 O0 0 11 1 1 4 68 0000000000 NPOR PEX PU 645084 O0 000 O0 0 11 1 1 4 68 0000000000 NPHI PEX PU 645084 O0 000 O0 0 11 1 1 4 68 0000000000 TNPH PEX PU 645084 O0 000 O0 0 i1 1 1 4 68 0000000000 ** DATA ** DEPT. 10796.000 TENS.AIT 894.000 HTEN. AIT 1110.624 GR.BHC CNTC. PEX 3013.042 CFTC.PEX 1737.892 RCFT. PEX 1596.601 RCNT. PEX TNRA.PEX 1.752 RTNR.PEX 1.774 NPOR.PEX 16.552 NPHI.PEX TNPH. PEX 17.334 49.607 2983.553 17.458 LIS Tape Verification Listing Schlumberger Alaska Computing Center 5-MAR-1997 15:23 PAGE: 38 DEPT. 10704.000 TENS.AIT CNTC. PEX 1044.335 CFTC. PEX TNR~.PEX 3.663 RTNR.PEX TNPH. PEX 44.166 384.000 HTEN. AIT 300.560 RCFT. PEX 4.094 NPOR.PEX 1106.042 GR.BHC 260.671 RCNT. PEX 40.823 NPHI.PEX 107.149 1021.209 49.075 ** END OF DATA ** **** FILE TRAILER **** FILE NAME : EDIT .011 SERVICE : FLIC VERSION : O01CO1 DATE : 97/03/ 5 MAX REC SIZE : 1024 FILE TYPE : LO LAST FILE : **** FILE HEADER **** FILE NAME : EDIT .012 SERVICE : FLIC VERSION : O01CO1 DATE : 97/03/ 5 MAX REC SIZE : 1024 FILE TYPE : LO LAST FILE : FILE HEADER FILE NUMBER 12 RAW CASED HOLE MAIN PASS Curves and log header data for open hole logs run into casing. PASS NUMBER: 2 DEPTH INCREMENT: O. 1667 FILE SUM~Uh~Y VENDOR TOOL CODE START DEPTH PEX 10796.0 $ LOG HEADER DATA DATE LOGGED: SOFTWARE VERSION: TIME CIRCULATION ENDED: TIME LOGGER ON BOTTOM: TD DRILLER (FT) : TD LOGGER (FT) : TOP LOG INTERVAL (FT) : BOTTOM LOG INTERVAL (FT) : STOP DEPTH .......... 10704.0 28-NOV-96 8B0-538 2000 27-NOV-96 1538 28-NOV-96 12687.0 12222.0 10704.0 12220.0 LIS Tape Verification Listing Schlumberger Alaska Computing Center 5-MAR-1997 15:23 PAGE: 39 LOGGING SPEED (FPHR) : 1800.0 TOOL STRING (TOP TO BOTTOM) VENDOR TOOL CODE TOOL TYPE AMS AUX. MEAS. SONDE BHC COMP. SONIC PEX PLATFORM EXPRESS AIT ARRAY INDUCTION TOOL $ TOOL NUMBER ........... AMS-A SLS-WA 1498 HILTB-DTB AIT-H 122 BOREHOLE AND CASING DATA OPEN HOLE BIT SIZE (IN): DRILLERS CASING DEPTH (FT) : LOGGERS CASING DEPTH (FT) '. 6.000 10803.0 10796.0 BOREHOLE CONDITIONS MUD TYPE: MUD DENSITY (LB/G): MUD VISCOSITY (S) : MUD PH: FLUID LOSS (C3): MAXIMUM RECORDED TEMPERATURE (DEGF): RESISTIVITY (OH~4M) AT TEMPERATURE (DEGF) : MUD AT MEASURED TEMPERATURE (MT): MUD AT BOTTOM HOLE TEMPERATURE (BHT) : MUD FILTRATE AT (MT): MUD FILTRATE AT (BHT) : MUD CAKE AT (MT): MUD CAKE AT (BHT) : SHEARDR I LN- N 10.40 54.0 8.7 196.0 O. 057 66.0 O. 049 66.0 0. 069 66.0 NEUTRON TOOL TOOL TYPE (EPITHERMAZ OR THERMAL): MATRIX: MATRIX DENSITY: HOLE CORRECTION (IN): THERMAL SANDSTONE 2.65 TOOL STANDOFF (IN): 0.5 REMARKS: ALL TOOLS RUN IN COMBINATION + TLC (AIT-TLD-CNT-GR-BHC). TWO .5" STANDOFFS RUN ON INDUCTION, FIVE .5" STANDOFFS RUN ON SONIC. TWO TOOL TURNERS USED TO ORIENT THE DENSITY & NEUTRON TOOL (PAD DOWN). INDUCTION ANOMALOUS DUE TO HIGH CHLORIDES (127, O00/RM = .057 OHHM) . BOREHOLE CONDITIONS WELL OUT OF AIT OPERATING RANGE. AIT MAIN PASS = DOWN LOG / REPEAT = UP LOG. AIT REPEAT POOR DUE TO BOREHOLE ENVIRONMENT & DOWN VS. UP LOG. AIT MAIN PASS IS DOWN DUE TO LOSS OF VALID SIGNAL ABOVE 11790'. LOSS OF SIGNAL POSSIBLY DUE TO METAL STANDOFF WHICH SLID DOWN ONTO THE SONDE. LOW INDUCTION SIGNAL @ 12193' PROBABLY DUE TO METAL IN HOLE (STANDOFF ?). THIS IS THE RAW PEX DATA ACQUIRED AT 0.1667' SAMPLE RATE LOGGED UP INTO CASING. $ LIS Tape Verification Listing Schlumberger Alaska Computing Center 5-MAR-1997 15:23 PAGE: 40 LIS FORMAT DATA ** DATA FORMAT SPECIFICATION RECORD ** ** SET TYPE- 64EB ** TYPE REPR CODE VALUE 1 66 0 2 66 0 3 73 32 4 66 1 5 66 6 73 7 65 8 68 0.166 9 65 FT 11 66 32 12 68 13 66 0 14 65 FT 15 66 68 16 66 1 0 66 1 ** SET TYPE - CHAN ** NAME SERV UNIT SERVICE API API API API FILE NUMB NUMB SIZE REPR PROCESS ID ORDER # LOG TYPE CLASS MOD NUMB SAMP ELEM CODE (HEX) DEPT FT 645084 O0 000 O0 0 12 1 1 4 68 0000000000 HGR PEX GAPI 645084 O0 000 O0 0 12 1 1 4 68 0000000000 HNPO PEX PU 645084 O0 000 O0 0 12 1 1 4 68 0000000000 HTNP PEX PU 645084 O0 000 O0 0 12 1 1 4 68 0000000000 RHNT PEX CPS 645084 O0 000 O0 0 12 1 1 4 68 0000000000 RHFT PEX CPS 645084 O0 000 O0 0 12 1 1 4 68 0000000000 HCNT PEX CPS 645084 O0 000 O0 0 12 1 1 4 68 0000000000 HCFT PEX CPS 645084 O0 000 O0 0 12 1 1 4 68 0000000000 ** DATA ** DEPT. 10796.000 HGR.PEX 49.773 HNPO.PEX 16.121 HTNP.PEX 16.925 RHNT. PEX 2955.130 RHFT. PEX 1687.532 HCNT. PEX 3009.368 HCFT. PEX 1763.770 DEPT. 10703.834 HGR.PEX RHNT. PEX 1079.761 RHFT. PEX 106.850 HNPO. PEX 52.337 HTNP.PEX 243.403 HCNT. PEX 1050.451 HCFT. PEX 48.888 278.550 LIS Tape Verification Listing Schlumberger Alaska Computing Center 5-MAR-1997 15:23 PAGE: 41 ** END OF DATA ** **** FILE TRAILER **** FILE NAME : EDIT .012 SERVICE : FLIC VERSION : O01CO1 DATE · 97/03/ 5 MAX REC SIZE : 1024 FILE TYPE : LO LAST FILE : **** TAPE TRAILER **** SERVICE NAME : EDIT DATE : 97/03/ 5 ORIGIN : FLIC TAPE NAME : 96387 CONTINUATION # .. 1 PREVIOUS TAPE : COMMENT : BP EXPLORATION, 4-O6A/Q-30,DUCK IS. ENDICOTT, 50-029-21723-01 **** REEL TRAILER **** SERVICE NAME : EDIT DATE : 97/03/ 5 ORIGIN : FLIC REEL NAME : 96387 CONTINUATION # : PREVIOUS REEL : COMMENT : BP EXPLORATION, 4-O6A/Q-30~DUCK IS. ENDICOTT, 50-029-21723-01 . Tape Subfile 2 is type: LIS MWD/MAD LO WELL NAME: ./~/,~[~_,,,-~ 4-06A/Q-30 API NUMBER: ~ 500292172301 OPERATOR: O~t~~-'~ LOGGING COMPANY: TAPE CREATION DATE: JOB DATA JOB NUMBER: LOGGING ENGINEER: OPERATOR WITNESS: MWD RUN 2 AK-MW- 60168 R. JACKSON E. VAUGHN BP EXPLORATION (ALASKA), INC. SPERRY-SUN DRILLING SERVICES 16-DEC-96 MWD RUN 3 R. JACKSON E. VAUGHN MWD RUN 4 R. JACKSON E. VAUGHN q MWD RUN 5 JOB NUMBER: LOGGING ENGINEER: OPERATOR WITNESS: SURFACE LOCATION SECTION: TOWNSHIP: RANGE: FNL: FSL: FEL: FWL: ELEVATION(FT FROM MSL 0) KELLY BUSHING: DERRICK FLOOR: GROUND LEVEL: WELL CASING RECORD E. CRIBBS E. VAUGHN MWD RUN 7 E. CRIBBS J. CARLILE 8 liN 17E 2579 836 56.00 14.10 OPEN HOLE CASING DRILLERS BIT SIZE (IN) SIZE (IN) DEPTH (FT) 1ST STRING 2ND STRING 3RD STRING 8.500 PRODUCTION STRING 6.000 REMARKS: 7.000 10803.0 12687.0 MWD - GR/EWR4. ALL DEPTHS ARE MEASURED BIT DEPTHS. WELL 4-06A/Q-30 IS REPRESENTED BY RUNS 1-7. RUN 1 IS DIRECTIONAL ONLY (TO ORIENT THE WHIPSTOCK), AND NO DATA IS PRESENTED. RUNS 2 AND 3 ARE DIRECTIONAL WITH GAMMA RAY (SGRD) . RUNS 4, 5, AND 7 ARE DIRECTIONAL WITH GAMMA RAY (SGRC), AND ELECTROMAGNETIC WAVE 4-PHASE RESISTIVITY (EWR4) . NO DRILLING WAS ACCOMPLISHED ON RUN 6. GAMMA RAY DATA FOR RUNS 2 AND 3 ACQUIRED WITH NATURAL GAMMA PROBE, SCINTILLATION TYPE DETECTOR, AND IS DENOTED AS NGP/SGRD. IT COVERS THE INTERVAL FROM 10746' TO 11172'. GAMMA RAY DATA FOR RUNS 4, 5, AND 7 ACQUIRED WITH DUAL GAMMA RAY, GEIGER MULLER TYPE DETECTORS, AND IS DENOTED AS DGR/SGRC. IT COVERS THE INTERVAL FROM 11172' TO 12639'. RESISTIVITY DATA FROM 10807' TO 11225' WAS LOGGED DURING A MEASURED AFTER DRILLING (MAD) PASS, AND IS PRESENTED AS PART OF MWD RUN 4. DATA FROM 12210' TO 12476' WAS LOGGED DURING A MEASURED AFTER DRILLING (MAD) PASS, AND IS PRESENTED AS PART OF MWD RUN 7. WELL 4-06A/Q-30 IS DEPTH SHIFTED. WELL 4-06A/Q-30 WAS DRILLED TO TD AT 12687'. FILE HEADER FILE NUMBER: 1 EDITED MERGED MWD Depth shifted and clipped curves; all bit runs merged. DEPTH INCREMENT: .5000 FILE SUMMARY PBU TOOL CODE GR RP $ BASELINE CURVE FOR SHIFTS: UNKNOWN CURVE SHIFT DATA (MEASURED DEPTH) START DEPTH 10748.0 10813.0 STOP DEPTH 12640.0 12647.0 EQUIVALENT UNSHIFTED DEPTH BASELINE DEPTH GR 10799.5 10797.5 10803.0 10799.5 10812.0 10807.0 10815.0 10808.5 10824.0 10817.5 10831.0 10826.5 10838.0 10834.0 10840.5 10836.0 10843.5 10840.5 $ MERGED DATA SOURCE PBU TOOL CODE BIT RUN NO MERGE TOP MWD 2 10800.0 MWD 3 10959.0 MWD 4 11225.0 MWD 5 11815.0 MWD 7 12476.0 $ REMARKS: MERGED MAIN PASS. MERGE BASE 10959.0 11225.0 11815.0 12476.0 12687.0 CN WN FN COUN STAT /??SHIFT. OUT $ : BP EXPLORATION (ALASKA) : 4-06A/Q-30 : ENDICOTT (SDI) : NORTH SLOPE : ALASKA * FORMAT RECORD (TYPE# 64) ONE DEPTH PER FRAME Tape depth ID: F 7 Curves: Name Tool Code Samples Units API API API API Log Crv Crv Size Length Typ Typ Cls Mod 1 GR MWD 68 1 2 RPX MWD 68 1 3 RPS MWD 68 1 4 RPM MWD 68 1 5 RPD MWD 68 1 6 FET MWD 68 1 7 ROP MWD 68 1 * DATA RECORD (TYPE# 0) Total Data Records: 131 AAPI 4 OHMM 4 OHMM 4 OHMM 4 OHMM 4 HR 4 FPHR 4 998 BYTES * 4 90 310 01 4 90 120 46 4 90 120 46 4 90 120 46 4 90 120 46 4 9O 180 01 4 90 810 01 28 Tape File Start Depth = 12730.000000 Tape File End Depth = 10700.000000 Tape File Level Spacing = 0.500000 Tape File Depth Units = Feet **** FILE TRAILER **** LIS representation code decoding summary: Rep Code: 68 32489 datums Tape Subfile: 2 246 records... Minimum record length: Maximum record length: 62 bytes 998 bytes Tape Subfile 3 is type: LIS FILE HEADER FILE NUMBER: 2 RAW MWD Curves and log header data for each bit run in separate files. BIT RUN NO: 2 DEPTH INCREMENT: .5000 FILE SUMMARY VENDOR TOOL CODE START DEPTH GR 10746.0 $ LOG HEADER DATA DATE LOGGED: SOFTWARE SURFACE SOFTWARE VERSION: DOWNHOLE SOFTWARE VERSION: DATA TYPE (MEMORY OR REAL-TIME): TD DRILLER (FT) : TOP LOG INTERVAL (FT) : BOTTOM LOG INTERVAL (FT) : BIT ROTATING SPEED (RPM) : HOLE INCLINATION (DEG) MINIMUM ANGLE: MAXIMUM ANGLE: STOP DEPTH 10906.0 15-NOV-96 MSC 1.32 / ISC 4.88 NGP 5.74 / SP4 5.03 MEMORY 10959.0 10800.O 10959.0 0 37.7 61.9 TOOL STRING (TOP TO BOTTOM) VENDOR TOOL CODE TOOL TYPE NGP NATIIRAL GAMMA PROBE $ TOOL NI/MBER NGP 228 BOREHOLE AND CASING DATA OPEN HOLE BIT SIZE (IN): DRILLER'S CASING DEPTH (FT) : 6.000 10803.0 BOREHOLE CONDITIONS MUD TYPE: MUD DENSITY (LB/G): MUD VISCOSITY (S) : MUD PH: MUD CHLORIDES (PPM) : FLUID LOSS (C3) : RESISTIVITY (OHMM) AT TEMPERATURE (DEGF) MUD AT MEASURED TEMPERATURE (MT): MUD AT MAX CIRCULATING TEMPERATURE: MUD FILTRATE AT MT: MUD CAKE AT MT: SHEARDRILL-N 10.30 53.0 8.9 12600 3.8 .000 .000 .000 .000 .0 137.8 .0 .0 NEUTRON TOOL MATRIX: MATRIX DENSITY: HOLE CORRECTION (IN): .00 .000 TOOL STANDOFF (IN) : EWR FREQUENCY (HZ) : .0 0 REMARKS: MWD RUN 2. CN WN FN COUN STAT : BP EXPLORATION (ALASKA) : 4-06A/Q-30 : ENDICOTT (SDI) : NORTH SLOPE : ALASKA * FORMAT RECORD (TYPE# 64) ONE DEPTH PER FRAME Tape depth ID: F 2 Curves: Name Tool Code Samples Units 1 GR MWD 68 1 AAPI 4 2 ROP MWD 68 1 FPHR 4 API API API API Log Crv Crv Size Length Typ Typ Cls Mod 4 90 310 01 1 4 90 810 01 1 * DATA RECORD (TYPE# 0) 1014 BYTES * Total Data Records: Tape File Start Depth = 10970.000000 Tape File End Depth = 10730.000000 Tape File Level Spacing = 0.500000 Tape File Depth Units = Feet **** FILE TRAILER **** LIS representation code decoding summary: Rep Code: 68 1444 datums Tape Subfile: 3 69 records... Minimum record length: Maximum record length: 62 bytes 1014 bytes Tape Subfile 4 is type: LIS FILE HEADER FILE NI/MBER: 3 RAW MWD Curves and log header data for each bit run in separate files. BIT RUN NO: 3 DEPTH INCREMENT: .5000 FILE SUMMARY VENDOR TOOL CODE START DEPTH GR 10906.0 $ LOG HEADER DATA DATE LOGGED: SOFTWARE SURFACE SOFTWARE VERSION: DOWNHOLE SOFTWARE VERSION: DATA TYPE (MEMORY OR REAL-TIME): TD DRILLER (FT) : TOP LOG INTERVAL (FT) : BOTTOM LOG INTERVAL (FT) : BIT ROTATING SPEED (RPM) : HOLE INCLINATION (DEG) MINIMUM ANGLE: MAXIMUM ANGLE: STOP DEPTH 11172.0 16-NOV-96 MSC 1.32 / ISC 4.88 NGP 5.74 / SP4 5.03 MEMORY 11225.0 10959.0 11225.0 0 68.6 87.5 TOOL STRING (TOP TO BOTTOM) VENDOR TOOL CODE TOOL TYPE NGP NATURAL GAMMA PROBE $ TOOL NUMBER NGP 228 BOREHOLE AND CASING DATA OPEN HOLE BIT SIZE (IN): DRILLER'S CASING DEPTH (FT) : 6.000 10803.0 BOREHOLE CONDITIONS MUD TYPE: MUD DENSITY (LB/G): MUD VISCOSITY (S) : MUD PH: MUD CHLORIDES (PPM) : FLUID LOSS (C3) : RESISTIVITY (OHMM) AT TEMPERATURE (DEGF) MUD AT MEASURED TEMPERATURE (MT): MUD AT MAX CIRCULATING TEMPERATURE: MUD FILTRATE AT MT: MUD CAKE AT MT: SHEARDRILL-N 10.30 54.0 9.0 12300 3.8 .000 .000 .000 .000 .0 146.0 .0 .0 NEUTRON TOOL MATRIX: MATRIX DENSITY: HOLE CORRECTION (IN): .00 .000 TOOL STANDOFF (IN) : EWR FREQUENCY (HZ) : .0 0 REMARKS: MWD RUN 3. CN WN FN COUN STAT : BP EXPLORATION (ALASKA) : 4-06A/Q-30 : ENDICOTT (SDI) : NORTH SLOPE : ALASKA * FORMAT RECORD (TYPE# 64) ONE DEPTH PER FRAME Tape depth ID: F 2 Curves: Name Tool Code Samples Units 1 GR MWD 68 1 AAPI 4 2 ROP MWD 68 1 FPHR 4 API API API API Log Crv Crv Size Length Typ Typ Cls Mod 4 90 310 O1 1 4 90 810 O1 1 * DATA RECORD (TYPE# 0) 1014 BYTES * Total Data Records: 9 Tape File Start Depth = 11235.000000 Tape File End Depth = 10895.000000 Tape File Level Spacing = 0.500000 Tape File Depth Units = Feet **** FILE TRAILER **** LIS representation code decoding summary: Rep Code: 68 34533 datums Tape Subfile: 4 72 records... Minimum record length: 62 bytes Maximum record length: 1014 bytes Tape Subfile 5 is type: LIS FILE HEADER FILE NUMBER: 4 RAW MWD Curves and log header data for each bit run in separate files. BIT RUN NO: 4 DEPTH INCREMENT: .5000 FILE SUMMARY VENDOR TOOL CODE START DEPTH GR 10802.0 EWR4 10808.0 $ LOG HEADER DATA DATE LOGGED: SOFTWARE SURFACE SOFTWARE VERSION: DOWNHOLE SOFTWARE VERSION: DATA TYPE (MEMORY OR REAL-TIME): TD DRILLER (FT) : TOP LOG INTERVAL (FT) : BOTTOM LOG INTERVAL (FT) : BIT ROTATING SPEED (RPM) : HOLE INCLINATION (DEG) MINIMUM ANGLE: MAXIMUM ANGLE: STOP DEPTH 11767.0 11774.0 21-NOV-96 MSC 1.32 / ISC 4.88 NGP 5.74 / SP4 5.03 MEMORY 11815.0 11225.0 11815.0 0 84.1 94.0 TOOL STRING (TOP TO BOTTOM) VENDOR TOOL CODE TOOL TYPE DGR DUAL GAMMA RAY EWR4 ELECTROMAG. RESIS. 4 $ TOOL NUMBER P0588SP4 P0588SP4 BOREHOLE AND CASING DATA OPEN HOLE BIT SIZE (IN): DRILLER'S CASING DEPTH (FT) : 6.000 10803.0 BOREHOLE CONDITIONS MUD TYPE: MUD DENSITY (LB/G): MUD VISCOSITY (S) : MUD PH: MUD CHLORIDES (PPM) : FLUID LOSS (C3) : RESISTIVITY (OHMM) AT TEMPERATURE (DEGF) MUD AT MEASURED TEMPERATURE (MT): MUD AT MAX CIRCULATING TEMPERATURE: MUD FILTRATE AT MT: MUD CAKE AT MT: SHEARDRILL-N 10.10 55.0 8.6 12300 3.5 .120 .050 .120 .160 68.0 178.1 68.0 68.0 NEUTRON TOOL MATRIX: MATRIX DENSITY: HOLE CORRECTION (IN): .00 .000 TOOL STANDOFF (IN) : EWR FREQUENCY (HZ) : .0 0 REMARKS: CN WN FN COUN STAT MWD RU'N 4. : BP EXPLORATION (ALASKA) : 4-06A/Q-30 : ENDICOTT (SDI) : NORTH SLOPE : ALASKA * FORMAT RECORD (TYPE# 64) ONE DEPTH PER FRAME Tape depth ID: F 7 Curves: Name Tool Code Samples Units API API API API Log Crv Crv Size Length Typ Typ Cls Mod 1 GR MWD 68 1 AAPI 4 2 RPX MWD 68 1 OHMM 4 3 RPS MWD 68 1 OHMM 4 4 RPM MWD 68 1 OHMM 4 5 RPD MWD 68 1 OHMM 4 6 FET MWD 68 1 HR 4 7 ROP MWD 68 1 FPHR 4 4 90 310 01 1 4 90 120 46 1 4 90 120 46 1 4 90 120 46 1 4 90 120 46 1 4 90 180 01 1 4 90 810 01 1 28 * DATA RECORD (TYPE# 0) 998 BYTES * Total Data Records: 67 Tape File Start Depth = 11825.000000 Tape File End Depth = 10795.000000 Tape File Level Spacing = 0.500000 Tape File Depth Units = Feet **** FILE TRAILER **** LIS representation code decoding summary: Rep Code: 68 17933 datums Tape Subfile: 5 132 records... Minimum record length: Maximum record length: 62 bytes 998 bytes Tape Subfile 6 is type: LIS FILE HEADER FILE NUMBER: 5 RAW MWD Curves and log header data for each bit run in separate files. BIT RUN NO: 5 DEPTH INCREMENT: .5000 FILE SUMMARY VENDOR TOOL CODE START DEPTH GR 11771.0 EWR4 11777.0 $ LOG HEADER DATA DATE LOGGED: SOFTWARE SURFACE SOFTWARE VERSION: DOWNHOLE SOFTWARE VERSION: DATA TYPE (MEMORY OR REAL-TIME): TD DRILLER (FT) : TOP LOG INTERVAL (FT) : BOTTOM LOG INTERVAL (FT) : BIT ROTATING SPEED (RPM) : HOLE INCLINATION (DEG) MINIMUM ANGLE: MAXIMUM ANGLE: STOP DEPTH 12210.0 12218.0 26-NOV-96 MSC 1.32 / ISC 4.88 NGP 5.74 / SP4 5.03 MEMORY 12476.0 11815.0 12476.0 0 70.6 92.5 TOOL STRING (TOP TO BOTTOM) VENDOR TOOL CODE TOOL TYPE DGR DUAL GAMMA RAY EWR4 ELECTROMAG. RESIS . 4 $ TOOL NUMBER P0498SP4 P0498SP4 BOREHOLE AND CASING DATA OPEN HOLE BIT SIZE (IN): DRILLER'S CASING DEPTH (FT) : 6.000 10803.0 BOREHOLE CONDITIONS MUD TYPE: MUD DENSITY (LB/G): MUD VISCOSITY (S) : MUD PH: MUD CHLORIDES (PPM) : FLUID LOSS (C3) : RESISTIVITY (OHMM) AT TEMPERATURE (DEGF) MUD AT MEASURED TEMPERATURE (MT): MUD AT MAX CIRCULATING TEMPERATURE: MUD FILTRATE AT MT: MUD CAKE AT MT: SHEARDR ILL - N 10.40 58.0 8.3 12000 3.6 .08O .037 .100 .070 67.0 155.0 67.0 67.0 NEUTRON TOOL MATRIX: MATRIX DENSITY: HOLE CORRECTION (IN): .00 .000 TOOL STANDOFF (IN) : EWR FREC~UENCY (HZ) : .0 0 REMARKS: CN WN FN COUN STAT MWD RUN 5. $ : BP EXPLORATION (ALASKA) : 4-06A/Q-30 : ENDICOTT (SDI) : NORTH SLOPE : ALASKA * FORMAT RECORD (TYPE# 64) ONE DEPTH PER FRAME Tape depth ID: F 7 Curves: Name Tool Code Samples Units API API API API Log Crv Crv Size Length Typ Typ Cls Mod 1 GR MWD 68 1 AAPI 4 2 RPX MWD 68 1 OHMM 4 3 RPS MWD 68 1 OHMM 4 4 RPM MWD 68 1 OHMM 4 5 RPD MWD 68 1 OHMM 4 6 FET MWD 68 1 HR 4 7 ROP MWD 68 1 FPHR 4 4 90 310 01 1 4 90 120 46 1 4 90 120 46 1 4 90 120 46 1 4 90 120 46 1 4 90 180 01 1 4 90 810 01 1 28 * DATA RECORD (TYPE# 0) 998 BYTES * Total Data Records: 47 Tape File Start Depth = 12485.000000 Tape File End Depth = 11760.000000 Tape File Level Spacing = 0.500000 Tape File Depth Units = Feet **** FILE TRAILER **** LIS representation code decoding summary: Rep Code: 68 46142 datums Tape Subfile: 6 112 records... Minimum record length: Maximum record length: 62 bytes 998 bytes Tape Subfile 7 is type: LIS FILE HEADER FILE NIIMBER: 6 RAW MWD Curves and log header data for each bit run in separate files. BIT RUN NO: 7 DEPTH INCREMENT: .5000 FILE SUMMARY VENDOR TOOL CODE START DEPTH GR 12155.0 EWR4 12161.0 $ LOG HEADER DATA DATE LOGGED: SOFTWARE SURFACE SOFTWARE VERSION: DOWNHOLE SOFTWARE VERSION: DATA TYPE (MEMORY OR REAL-TIME): TD DRILLER (FT) : TOP LOG INTERVAL (FT) : BOTTOM LOG INTERVAL (FT) : BIT ROTATING SPEED (RPM) : HOLE INCLINATION (DEG) MINIMUM ANGLE: MAXIMUM ANGLE: STOP DEPTH 12639.0 12646.0 28-NOV-96 MSC 1.32 / ISC 4.88 NGP 5.74 / SP4 5.03 MEMORY 12687.0 12476.0 12687.0 0 65.5 70.0 TOOL STRING (TOP TO BOTTOM) VENDOR TOOL CODE TOOL TYPE DGR DUAL GAMMA RAY EWR4 ELECTROMAG. RESIS. 4 $ TOOL NUMBER P0588SP4 P0588SP4 BOREHOLE AND CASING DATA OPEN HOLE BIT SIZE (IN): DRILLER'S CASING DEPTH (FT) : 6.000 10803.0 BOREHOLE CONDITIONS MUD TYPE: MUD DENSITY (LB/G): MUD VISCOSITY (S) : MUD PH: MUD CHLORIDES (PPM) : FLUID LOSS (C3) : RESISTIVITY (OHMM) AT TEMPERATURE (DEGF) MUD AT MEASURED TEMPERATURE (MT): MUD AT MAX CIRCULATING TEMPERATURE: MUD FILTRATE AT MT: MUD CAKE AT MT: SHEARDRILL-N 10.40 57.0 8.4 12800 3.2 .O4O .017 .050 .060 70.0 175.0 70.0 70.0 NEUTRON TOOL MATRIX: MATRIX DENSITY: HOLE CORRECTION (IN): .00 .000 TOOL STANDOFF (IN) : EWR FREQUENCY (HZ) : .0 0 REMARKS: CN WN FN COUN STAT MWD RUN 7. $ :BP EXPLORATION (ALASKA) : 4-06A/Q-30 : ENDICOTT (SDI) : NORTH SLOPE : ALASKA * FORMAT RECORD (TYPE# 64) ONE DEPTH PER FRAME Tape depth ID: F 7 Curves: Name Tool Code Samples Units API API API API Log Crv Crv Size Length Typ Typ Cls Mod 1 GR MWD 68 1 AAPI 4 2 RPX MWD 68 1 OHMM 4 3 RPS MWD 68 1 OHMM 4 4 RPM MWD 68 1 OHMM 4 5 RPD MWD 68 1 OHMM 4 6 FET MWD 68 1 HR 4 7 ROP MWD 68 1 FPHR 4 4 90 310 01 1 4 90 120 46 1 4 90 120 46 1 4 90 120 46 1 4 90 120 46 1 4 90 180 01 1 4 90 810 01 1 28 * DATA RECORD (TYPE# 0) 998 BYTES * Total Data Records: 36 Tape File Start Depth = 12700.000000 Tape File End Depth = 12145.000000 Tape File Level Spacing = 0.500000 Tape File Depth Units = Feet **** FILE TRAILER **** LIS representation code decoding summary: Rep Code: 68 26822 datums Tape Subfile' 7 101 records... Minimum record length: Maximum record length: 62 bytes 998 bytes ~ Subfile 8 is type: LIS 96/12/16 O1 **** REEL TRAILER **** 96/12/16 O1 Tape Subfile: 8 2 records... Minimum record length: 132 bytes Maximum record length: 132 bytes End of execution: Mon 16 DEC 96 9:54a Elapsed execution time = 1.59 seconds. SYSTEM RETURN CODE = 0