Alaska Logo
Department of Commerce, Community, and Economic Development
Alaska Oil and Gas Conservation
Commission
Loading...
HomeMy WebLinkAbout196-155 • • RECEIVED Post Office Box 244027 Anchorage,AK 99524-4027 JUL 0 Hilcorp Alaska,LLC 0h 3800 Centerpoint Drive Suite 100 AOGCCAnchorage,AK 99503 Phone: 907/777-8300 Fax: 907/777.-8301 July 29, 2015 Commissioner Cathy Foerster Alaska Oil & Gas Conservation Commission 333 West 7th Avenue, Suite 100 / 1 Anchorage, AK 99501 Re: Duck Island Unit Well Renaming Request Dear Commissioner Foerster, SCANNED SEP n � r Hilcorp Alaska, LLC (HAK) requests a change to the naming convention of Duck Island Unit wells to remove the unused suffixes at the end of each well name. Well names currently include a forward slash "/" followed by an obsolete bottom hole location designator. HAK would like to retain the well number as well as the "A, B, C...." sidetrack designations but remove the "/suffix". For example, "DUCK IS UNIT SDI 1-09A/L21" would become "DUCK IS UNIT SDI 1-09A". The attached spreadsheet includes original and new names for all Duck Island wells. While performing the review of Duck Island well names, HAK found a single well, "DUCK IS UNIT SDI 4-20/M35" (PTD# 1861730), that should also be modified to include an "A" label to reflect the fact that the well is a sidetrack from the original "DUCK IS UNIT SDI 4-20/T34" (PTD# 1861500). The original wellbore, abandoned 10/13/1986, was sidetracked to a new bottom hole location completed on 9/9/1987. This well appears to be one of the first sidetracks performed at Endicott. While the bottom hole code was changed, no letter was added to reflect the sidetrack. "DUCK IS UNIT SDI 4-20A" is also included on the attached spreadsheet. Sincerely, Wyatt Rivard Well Integrity Engineer Hilcorp Alaska, LLC CC Dave Roby Victoria Loepp • Orig • New API_WeIINo I PermitNumberl WellName I WellNumber I WellNumber 50029219460600 2032160 DUCK IS UNIT SDI 3-17F/K30 3-17F 50029224630000 1940490 DUCK IS UNIT SDI 3-19/R28 3-19 50029217140000 1870330 DUCK IS UNIT SDI 3-21/L34 3-21 50029217149500 1980190 DUCK IS UNIT SDI 3-21AK35XX 3-21AXX 50029216450000 1861550 DUCK IS UNIT SDI 3-23/N32 3-23 50029221250000 1901820 DUCK IS UNIT SDI 3-25/M27 3-25 50029221250100 2010200 DUCK IS UNIT SDI 3-25A/N24 3-25A 50029221250200 2030210 DUCK IS UNIT SDI 3-25B/L27 3-25B 50029215860000 1860830 DUCK IS UNIT SDI 3-27/M33 3-27 50029221060000 1901560 DUCK IS UNIT SDI 3-29/132 3-29 50029228380000 1972270 DUCK IS UNIT SDI 3-31/K32 3-31 50029216680000 1861800 DUCK IS UNIT SDI 3-33/K37 3-33 50029216680100 2032150 DUCK IS UNIT SDI 3-33A/J35 3-33A 50029217010000 1870200 DUCK IS UNIT SDI 3-35/L36 3-35 50029225540000 1950510 DUCK IS UNIT SDI 3-37/L35 3-37 50029217640000 1871160 DUCK IS UNIT SDI 3-39/J39 3-39 50029217640100 1970910 DUCK IS UNIT SDI 3-39A/137 3-39A 50029218780000 1881260 DUCK IS UNIT SDI 3-41/K39 3-41 50029224160000 1931700 DUCK IS UNIT SDI 3-43/P36 3-43 50029218110000 1880510 DUCK IS UNIT SDI 3-45/M39 3-45 50029215690000 1860640 DUCK IS UNIT SDI 3-47/Q35 3-47 50029217350000 1870600 DUCK IS UNIT SDI 3-49/140 3-49 50029217350200 1970570 DUCK IS UNIT SDI 3-49A/M40 3-49A 50029217359500 1950350 DUCK IS UNIT SDI 3-49AJ40XX 3-49AXX 50029217890000 1880220 DUCK IS UNIT SDI 4-02/028 4-02 50029219680000 1890860 DUCK IS UNIT SDI 4-04/T26 4-04 50029219680100 2090190 DUCK IS UNIT SDI 4-04A/T30 4-04A 50029217230000 1870430 DUCK IS UNIT SDI 4-06/Q32 4-06 50029217230100 1961660 DUCK IS UNIT SDI 4-06A/Q30 4-06A 50029216920000 1870080 DUCK IS UNIT SDI 4-08/P27 4-08 50029224640000 1940500 DUCK IS UNIT SDI 4-10/M28 4-10 50029224640100 2022380 DUCK IS UNIT SDI 4-10A/L28 4-10A 50029218630000 1881040 DUCK IS UNIT SDI 4-14/R34 4-14 50029218630100 2080120 DUCK IS UNIT SDI 4-14A/S-37 4-14A 50029218960000 1881490 DUCK IS UNIT SDI 4-18/S30 4-18 50029216400100 1861730 DUCK IS UNIT SDI 4-20/M35 4-20A 50029216400000 1861500 DUCK IS UNIT SDI 4-20/T34 4-20 50029218350000 1880720 DUCK IS UNIT SDI 4-26/034 4-26 50029218700000 1881110 DUCK IS UNIT SDI 4-28/N37 4-28 50029225590000 1950690 DUCK IS UNIT SDI 4-32/K38 4-32 50029227050000 1961550 DUCK IS UNIT SDI 4-34/038 4-34 50029224820000 1940740 DUCK IS UNIT SDI 4-38/K34 4-38 50029222650000 1920420 DUCK IS UNIT SDI 4-40/P43 4-40 50029217310000 1870560 DUCK IS UNIT SDI 4-42/P38 4-42 50029222540000 1920190 DUCK IS UNIT SDI 4-44/M44 4-44 50029222549500 1970470 DUCK IS UNIT SDI 4-44AM40XX 4-44AXX 50029219570000 1890690 DUCK IS UNIT SDI 4-46/N39 4-46 50029219720000 1890970 DUCK IS UNIT SDI 4-48/K43 4-48 50029219400000 1890440 DUCK IS UNIT SDI 4-50/K41 4-50 Pages NOT Scanned in this Well History File XHVZE This page identifies those items that were not scanned during the initial scanning project. They are available in the original file and viewable by direct inspection. ~2" 15 5 File Number of Well History File PAGES TO DELETE Complete RESCAN Color items - Pages: GraYScale, halftones, pictures, graphs, charts - Pages: Poor Quality Original'- Pages: Other- Pages: DIGITAL DATA Diskettes, No. Other, No/Type -OVERSIZED Logs of various kinds Other COMMENTS: Sca n~~dred. D~retha Nathan Lowell TO RE-SCAN Notes: P~_.qr'_..nnnp_rl hv: ~,ve~ Mildred Daretha Nathan Lowell Date: /s/ • bp BP Exploration (Alaska) Inc. Attn: Well Integrity Coordinator, PRB -20 Post Office Box 196612 Anchorage, Alaska 99519 -6612 May 22, 2012 Mr. Jim Regg I c -~ t S' Alaska Oil and Gas Conservation Commission '` _ `3g 333 West 7 Avenue E Anchorage, Alaska 99501 Subject: Corrosion Inhibitor Treatments of Endicott Row 4 Dear Mr. Regg, Enclosed please find multiple copies of a spreadsheet with a list of wells from Endicott Row 4 that were treated with corrosion inhibitor in the surface casing by conductor annulus. The corrosion inhibitor is engineered to prevent water from entering the annular space and causing external corrosion that could result in a surface casing leak to atmosphere. The attached spreadsheet represents the well name, API and PTD numbers, top of cement depth prior to filling and volumes of corrosion inhibitor used in each conductor. As per previous agreement with the AOGCC, this letter and spreadsheet serve as notification that the treatments took place and meet the requirements of form 10 -404, Report of Sundry Operations. If you require any additional information, please contact me or my altemate, Gerald Murphy, at 659 -5102. Sincerely, "79 Mehreen Vazir BPXA, Well Integrity Coordinator 0 • BP Exploration (Alaska) Inc. Surface Casing by Conductor Annulus Cement, Corrosion inhibitor, Sealant Top-off Report of Sundry Operations (10404) Endicott Row 4 Date: 10/07/10 Corrosion Initial top of Vol. of cement Final top of Cement top off Corrosion inhibitor/ Well Name PTD # API # cement pumped cement date inhibitor sealant date ft bbts ft na gal END4 -02 / 0-28 1880220 50029217890000 0.3 NA 0.3 NA 1.70 9/29/2010 END4 -04 / T -30 2090190 50029219680100 4 2.0 0.8 9/2/2010 3.40 9/29/2010 END4 -06A / 0-30 1961660 50029217230100 4 3.0 0.1 9/6/2010 2.55 9/30/2010 END4 -08 / P -27 1870080 50029216920000 5 3.0 0.8 9/2/2010 6.00 9/30/2010 END4 -10A / L -28 2022380 50029224640100 15 12.5 0.5 9/6/2010 1.70 9/30/2010 END4 -14A / S -37 2080120 50029218630100 0.3 NA 0.3 NA 1.70 9/30/2010 END4-16 / S-30 1881490 50029218960000 7 2.0 0.8 9/2/2010 4.30 9/30/2010 EN D4-20 / M-35 1861730 50029216400100 1.5 0.5 0.4 9/6/2010 2.55 10/4/2010 END4-26 / 0-34 1880720 50029218350000 1.2 NA 1.2 NA 10.20 10/4/2010 END4 -28 / N-37 1881110 50029218700000 2 1.0 0.5 9/6/2010 3.40 10/4/2010 END4 -32 / K -38 1950690 50029225590000 6 6.0 0.7 9/2/2010 6.80 10/4/2010 ') END4 -34 / 0-38 1961550 50029227050000 4 1.0 0.3 9/6/2010 1.70 10/4/2010 END4-38 / K-34 1940740 50029224820000 10 7.0 0.3 916/2010 1.70 10/4/2010 END4 -40 / P-43 1920420 50029222650000 1.5 0.3 0.4 9/6/2010 3.40 10/4/2010 END4 -42 / P -38 1870560 50029217310000 0.5 NA 0.5 NA 3.40 10/4/2010 END4 -44 1 M-44 1920190 50029222540000 1.5 0.3 0.5 9/6/2010 1.70 10/4/2010 END4 -46 / N-39 1890690 50029219570000 3 2.5 0.8 9/6/2010 5.10 10/4/2010 END4 -48 / K-43 1890970 50029219720000 4 2.0 0.8 9/6/2010 5.10 10/4/2010 END4 -50 / K-41 1890440 50029219400000 1.3 0.1 0.3 9/6/2010 1.70 10/4/2010 THE MATERIAL UNDER THIS COVER HAS BEEN MICROFILMED ON OR BEFORE JANUARY 03 2001 PL M ATE C-&ORI~NtDOC T H E W IS IA L UNDER M A R K E R PERMIT DATA AOGCC Individual Well Geological Materials Inventory T DATA PLUS Page: 1 Date: 11/05/98 RUN RECVD 96-155 CN/GR/CCL 96-155 SBL/GR/CCL 96-155 GR/CCL-PERF 96-155 SBL/GR/CCL 96-155 GR/CCL-PERF 96-155 GR/CCL TCP TIE 96-155 PROD PROF 96-155 PROD PROF 96-155 DEFT 96-155 JWL 96-155 7591 96-155 MWD SRVY~,¥ 96-155 ~GYRO SINGLESHOT 96-155 ROP/DGR/EWR4-MD 96-155 DGR/EWR4-TVD 96-155 DGR/CNP/SLD-MD 96-155 DGR/CNP/SLD-TVD 96-155 7752 ~/9400-12740 ~L~9400-12774 ~/10350-10460 ~//9000-10621 ~/10100-10421 ~/965-10155 ~ 10300-12800 10300-12800 10300-12800 ~/8800-10120 , 4-16 SPERRY GR/RES/SLD/CNP ~/0-12940 R~- 4122 ~4540-12940 ~/4515- 9984 ~10100-12905 ~/9830-10240 ~'/WA CN/GR 11/06/96 11/06/96 11/06/96 11/06/96 11/06/96 11/15/96 FINAL 12/13/96 FINAL 12/13/96 FINAL 12/13/96 FINAL 12/13/96 01/29/97 03/05/97 03/05/97 FINAL 02/05/97 FINAL 02/05/97 FINAL 02/05/97 FINAL 02/05/97 1 07/22/97 10-407 ~COMPLETION DATE /~ 0/ f~ DAILY WELL ePS R ~/~<¥~/ TO ///D~/~/ Are dry ditch samples required? yes ~And received? Was the well cored? yes ~.~Analysis & description received? Are well tests required? yes~"n~~~eceived? yes no Well is in compliance Initial COMMENTS 3 / : / ,?r/.'.-~ ~ / v Department BP Exploration (Alaska) Inc. 900 East Benson Boulevard P.O. Box 196612 Anchorage, Alaska 99519-6612 (907) 561-5111 HAND DELIVERED January 8, 1998 David Johnston Chairman Alaska Oil and Gas Conservation Commission 3001 Porcupine Drive Anchorage, Alaska 99501-3192 Dear Mr. Johnston: I understand that the following wells: 1-03/P-16, 2-46A/R-10, 4-06A/Q-30, and, 4-34/O-38, are all within the Endicott Participating Area of the Duck Island Unit and currently under confidential file at the AOGCC under the provisions of AS 31.05.035(c). Please consider this letter your authorization to allow Julie Heusser, a contractor to BP Exploration Alaska, Inc., to examine and copy, if necessary, relevant portions of these files on behalf of BPXA and the Working Interest Owners of the Duck Island Unit. If you have any questions or require further assurances, please contact me at 564- Very Truly Your.s, Daniel Huxle~y BPX Endicott Asset Manager RECEIVED Gas Cons. commission Anchorage LORI TAYLOR Attn. ALASKA OIL + GAS CONSERVATION 3001 PORCUPINE DRIVE ANCHOKAGE AK, 99501. Dear Sir/Madam, Reference: 4-34/0-38 ENDICOTT Date: RE: 9 July 1997 Transmittal of Data ECC ~: 6821.01 Sent by: MAIL Data: CN/GR NORTH SLOPE, AK Enclosed, please find the data as described below: Tapes/Diskettes: 1 LDWG TAPE & LISTER Run ~ 1 Please sign and return to: Attn. Glen Horel Western Atlas Logging Services 1200, 505 - 3rd Street S.W. Calgary, Alberta T2P 3E6 Or FAX to (403) 571-1050 Received by :~~~ ~~ Date: STATE OF ALASKA ALASKA tJ,L AND GAS CONSERVATION COrvl~vllSSlON WELL COMPLETION OR RECOMPLETION REPORT AND LOG 1. Status of Well Classification of Service Well [] Oil [] Gas [] Suspended [] Abandoned [] Service 2. Name of Operator 7. Permit Number BP Exploration (Alaska) Inc. 96-155 3. Address 8. APl Number P.O. Box 196612, Anchorage, Alaska 99519-6612 50-029-22705 4. Location of well at surface ~ ...... , ................. 9. Unit or Lease Name ~~'*~-~, Duck Island Unit/Endicott 2602' NSL, 667' WEL, SEC. 8, T11 N, R17E i ~¥.;i?!--i. i!";~?. I -~-:' ' ~-' -, · ~,, At2933, NSL,t°P of productive interval ,~/;~,~ !/~/~--/' ~ ~ ~~ 10. Well Number 1221' WEL' SEC' 9' T11N' R17E! " ..... ._ ~ '~ ': !{ 4-34/O-38 At total depth ~.!~!i i~i;%~ 11. Field and Pool 3245' NSL, 3839' EWL, SEC. 9, T11N, R17E' .-, .- .,-~'~: ;~ Endicott Field / Endicott Pool 5. Elevation in feet (indicate KB, DF, etc.) 16. Lease Designation and Serial No. Plan RTE = 55.6'I ADL 047503 I I I6' °ffsh°re 116' N°' °f C°mpleti°ns- 12' MSLI One 12. Date Spudded 13. Date T.D. Reached 14. Date Comp., Susp., or Aband. 15. Water depth,if 09/20/96 10/20/96 11/07/96 17. Total Depth (MD+TVD)118. Plug Back Depth (MD+TVD)I19. Directional Survey 20. Depth where SSSV set121. Thickness of Permafrosl 12940 10257 FTI 12835 10204 FTI I~Yes I-1No 1557' MD! 1465' (Approx.) 22. Type Electric or Other Logs Run Gyro, MWD, LWD, GR/CN/SBT, DIR/FE, CBL, GR/CCL/CBT 23. CASING, LINER AND CEMENTING RECORD CASING SE'FI'lNG DEPTH HOLE SIZE VV'T'. PER FT. GRADE TOP BO'FrOM SIZE CEMENTING RECORD AMOUNT PULLED 20" 94# L-80 Surface 90' Driven 9-5/8" 40# L-80 43' 4669' 12-1/4" 1312 sx PF 'E', 300 sx Class 'G' 7" 26# L-80 40' 12901' 8-1/2" 575 sx Class 'G' 24. Perforations open to Production (MD+TVD of Top and Bottom 25. TUBING RECORD and interval, size and number) S~ZE DEPTH SET (MD) PACKER SET (MD) See Attachment 4-1/2", 12.6#, 13CR80 10085' 10028' MD TVD MD TVD 26. ACID, FRACTURE, CEMENT SQUEEZE, ETC, DEPTH INTERVAL (MD) AMOUNT & KIND OF MATERIAL USED Freeze protect w/34 bbls diesel to 1000' 12450'-12940' Cement squeezed 100 sx 'G' at 2300 psi 11320'-12450' Cement squeezed 100 sx 'G' at 2400 psi 10300'-11320' Cement squeezed 200 sx 'G' at 1600 psi 27. PRODUCTION TEST Date First Production IMethod of Operation (Flowing, gas lift, etc.) 11/08/96 I Gas Lift Date of Test Hours Tested PRODUCTION FOR OIL-BBL GAS-MCF WATER-BBL CHOKE SIZE I GAS-OIL RATIO TEST PERIOD · I Flow Tubing Casing Pressure OALCULATED· OIL-BBL GAS-MCF WATER-BBL OIL GRAVITY-APl (CORR) Press. ;~4-HOUR RATE 28. CORE DATA Brief description of lithology, porosity, fractures, apparent dips and presence of oil, gas or water. Submit core chips. ORIGINAL 0 5 199'i' .~'Jasks Oi! & G~s Cons, Anch0mge Form 10-407 Rev. 07-01-80 Submit In Duplicate 29. Geologic Markers 30. .~rmation Tests Measured True Vertical Include interval tested, pressure data, all fluids recovered Marker Name Depth Depth and gravity, GOR, and time of each phase. (Subsea) LCU 10240' 9855' Kekiktu k 10404' 9911' FIV 12394' 9990' 31. List of Attachments Summary of Daily Drilling Reports, Surveys 32. I hereby certify that the_foregoing i,s true and correct to the best of my knowledge SteveShultz , 1, Title Senior Drilling Engineer Date ~ '-~ --- ~ Prepared By Name/Number: Kathy Campoamor, 564-5122 INSTRUCTIONS GENERAL: This form is designed for submitting a complete and correct well completion report and log on all types of lands and leases in Alaska. ITEM 1: Classification of Service Wells: Gas injection, water injection, steam injection, air injection, salt water disposal, water supply for injection, observation, injection for in-situ combustion. ITEM 5: Indicate which elevation is used as reference (where not otherwise shown) for depth measurements given in other spaces on this form and in any attachments. ITEM 16 AND 24: If this well is completed for separate production from more than one interval (multiple completion), so state in item 16, and in item 24 show the producing intervals for only the interval reported in item 27. Submit a separate form for each additional interval to be separately produced, showing the data pertinent to such interval. ITEM 21: Indicate whether from ground level (GL) or other elevation (DF, KB, etc.). ITEM 23: Attached supplemental records for this well should show the details of any multiple stage cementing and the location of the cementing tool. ITEM 27: Method of Operation: Flowing, Gas Lift, Rod Pump, Hydraulic Pump, Submersible, Water Injection, Gas Injection, Shut-In, Other-explain. ITEM 28: If no cores taken, indicate 'none'. Form 10-407 Rev. 07-01-80 STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION Form 10-407 Attachment COMMISSION WELL NAME: 4-34/0-38 124. Perforations open to Production MD TVD Gun Diameter SP 2246'-12250' 10019'-10019' 4-1/2" 5 2546'-12550' 10086'-10088' 4-1/2" 5 1420'-11424' 9992'-9992' 4-1/2" 5 1120'-11124' 9981'-9981' 4-1/2" 5 0398'- 10400' 9964'-9964' 3-3/8" 4 0296'- 10300' 9933'-9934' 3-3/8" 6 0425'-10555' 9970'-9980' 4-1/2" 5 0575'-10760' 9980'-9983' 4-1/2" 5 0844'-10950' 9983'-9981' 4-1/2" 5 1100'- 11190' 9981 '-9983' 4-1/2" 5 1410'- 11440' 9992'-9993' 4-1/2" 5 1580'- 11700' 9996'-9999' 4-1/2" 5 2210'-12260' 10016'-10021' 4-1/2" 5 2365'-12400' 10038'-10046' 4-1/2" 5 F Status Squeezed Squeezed Squeezed Squeezed Squeezed Open Open Open Open Open Open Open Open Open SUMMARY OF DALLY OPERATIONS SHARED SERVICES DRILLING - BPX / ARCO WelIName: 4-34/0-38 RigName: Doyon 15 AFE: 727106 Accept Date: 09/1 9/96 Spud Date: 09/20/96 Release Date: 1 1/07/96 Sep 20 1996 (1) Held safety meeting. Rig moved 100 %. Rig accepted 09/19/96 @ 1200 hrs. RU divertor. Held safety meeting. MU BHA #1. Tested divertor. MU BHA #1. RU logging/braided cable equipment. Held safety meeting. Drilled to 525 ft. Sep 21 1996 (2) Held safety meeting. Drilled to 1547 ft. Held safety meeting. Drilled to 2815 ft. Sep 22 1996 (3) Held safety meeting. Drilled to 3449 ft. Circulated at 3449 ft. POOH to 187 ft. Pulled BHA. Held safety meeting. RIH to 3449 ft. Drilled to 4023 ft. Circulated at 4023 ft. Drilled to 4118 ft. Sep 23 1996 (4) Held safety meeting. Drilled to 4680 ft. Circulated at 4680 ft. Held safety meeting. POOH to 3445 ft. RIH to 4680 ft. Circulated at 4680 ft. POOH to 887.76 ft. Pulled BHA. RU casing handling equipment. Held safety meeting. Ran casing to 1000 ft (9.625 in OD). Sep 24 1996 (5) Held safety meeting. Ran casing to 4669 ft (9.625 in OD). Circulated at 4669 ft. Ran drillpipe to 4582 ft (4.5 in OD). Circulated at 4669 ft. Held safety meeting. Mixed and pumped slurry - 568 bbl. Circulated at 4583 ft. Pulled drillpipe in stands to 4582 ft. RD divertor. Installed wellhead primary components. Sep 25 1996 (6) Held safety meeting. RU BOP stack. Tested BOP stack. Installed wear bushing. Serviced top drive. MU BHA #2. Held safety meeting. MU BHA #2. Serviced block line. RIH to 4584 ft. Circulated at 4584 ft. Tested casing - via string. Drilled to 4700 ft. Circulated at 4700 ft. Performed formation integrity test 12.7 ppg EMW. Drilled to 4868 ft. Page Sep 26 1996 (7) Held safety meeting. Performed formation ft. Drilled to 6385 ft. Drilled to 5624 ft. Circulated at 5624 ft. POOH to 4669 ft. integrity test, 15.2 ppg EMW. Held safety meeting. RIH to 5624 Sep 27 1996 (8) Held safety meeting. Drilled to 7148 ft. Held safety meeting. Drilled to 7335 ft. Circulated at 7335 ft. POOH to 189 ft. Pulled BHA. MU BHA #2. RIH to 3500 ft. Sep 28 1996 (9) Held safety meeting. RIH to 5909 ft. Took MWD survey at 5909 ft. POOH to 189 ft. Pulled BHA. Downloaded MWD tool. RIH to 5909 ft. Took MWD survey at 5909 ft. RIH to 7335 ft. Drilled to 7500 ft. Held safety meeting. Drilled to 8030 ft. Sep 29 1996 (10) Held safety meeting. Drilled to 8210 ft. Circulated at 8210 ft. Repaired trip tank. POOH to 1550 ft. Pulled BHA. MU BHA #4. RIH to 1550 ft. Held safety meeting. RIH to 4670 ft. Serviced block line. RIH to 5923 ft. Took MWD survey at 5923 ft. RIH to 8210 ft. Drilled to 8585 ft. Sep 30 1996 (11) Held safety meeting. Drilled to 8868 ft. Circulated at 8868 ft. POOH to 4670 ft. Held safety meeting. POOH to 1500 ft. Pulled BHA. Downloaded MWD tool. MU BHA #5. RIH to 5935 ft. Took MWD survey at 5935 ft. RIH to 8868 ft. Drilled to 8976 ft. Oct I 1996 (12) Held safety meeting. Drilled to 9456 ft. Held safety meeting. Drilled to 9547 ft. Circulated at 9547 ft. POOH to 1562 ft. Pulled BHA. Tested BOP stack. Oct 2 1996 (13) Installed wear bushing. Held safety meeting. MU BHA #6. RIH to 5909 ft. Took MWD survey at 5909 ft. RIH to 9517 ft. RIH to 9547 ft. Drilled to 9625 ft. Held safety meeting. Drilled to 9876 ft. Circulated at 9876 ft. Oct 3 1996 (14) Held safety meeting. POOH to 1522 ft. Pulled BHA. MU BHA #7. RIH to 4662 ft. Serviced block line. RIH to 5886 ft. Held safety meeting. RIH to 9876 ft. Circulated at 9876 ft. Drilled to 10043 ft. Page 2 Oct 4 1996 (15) Held safety meeting. Drilled to 10196 ft. Held safety meeting. Drilled to 10200 ft. Circulated at 10200 ft. POOH to 1522 ft. Pulled BHA. MU BHA #8. RIH to 5901 ft. Took MWD survey at 5901 ft. RIH to 8700 ft. Oct 5 1996 (16) Held safety meeting. RIH to 10110 ft. Reamed to 10200 ft. Drilled to 10294 ft. Held safety meeting. Drilled to 10368 ft. Oct 6 1996 (17) Held safety meeting. Drilled to 10424 ft. Circulated at 10424 ft. Drilled to 10508 ft. Held safety meeting. Drilled to 10555 ft. Circulated at 10555 ft. POOH to 10150 ft. RIH to 10555 ft. Circulated at 10555 ft. Circulated at 10555 ft. Flow check. POOH to 1531 ft. Pulled BHA. Oct 7 1996 (18) Held safety meeting. MU BHA #9. RIH to 4620 ft. Serviced block line. RIH to 5932 ft. Took MWD survey at 5932 ft. RIH to 9900 ft. Logged hole with LWD: DIR/FE from 9900 ft to 10417 ft. Held safety meeting. Logged hole with LWD: DIR/FE from 10417 ft to 10555 ft. Drilled to 10764 ft. Oct 8 1996 (19) Held safety meeting. 'Drilled to 10797 ft. Circulated at 10797 ft. Drilled to 10985 ft. Held safety meeting. Drilled to 10990 ft. Circulated at 10990 ft. POOH to 10730 ft. Circulated at 10990 ft. POOH to 5473 ft. Pulled BHA. Downloaded MWD tool. Pulled BHA. Tested BOP stack. Oct 9 1996 (20) Tested BOP stack. Repaired top drive. Serviced draw works. Made up BHA #10. RIH to 5932 ft. Took MWD survey at 5932 ft. RIH to 10225 ft. Washed to 10990 ft. Held safety meeting. Drilled to 11059 ft. Circulated at 11059 ft. POOH to 5449 ft. Pulled BHA. Oct 10 1996 (21) Held safety meeting. Downloaded MWD tool. MU BHA #11. RIH to 4669 ft. Serviced block line. RIH to 6028 ft. Took MWD survey at 6028 ft. RIH to 10131 ft. Reamed to 10131 ft. RIH to 11056 ft. Held safety meeting. Drilled to 11295 ft. Page 3 Oct 11 1996 (22) Held safety meeting. Drilled to 11458 ft. Held safety meeting. Drilled to 11560 ft. Circulated at 11560 ft. POOH to 11042 ft. Drilled to 11704 ft. Oct 12 1996 (23) Held safety meeting. Drilled to 11724 ft. POOH to 4202 ft. Pulled BHA. Downloaded MWD tool. MU BHA #12. Held safety meeting. RIH to 4680 ft. Singled in drillpipe to 4680 ft. RIH to 6028 ft. Took MWD survey at 6028 ft. RIH to 11630 ft. Reamed to 11724 ft. Drilled to 11819 ft. Oct 13 1996 (24) Held safety meeting. Drilled to 11973 ft. Held safety meeting. Drilled to 12126 ft. Circulated at 12126 ft. POOH to 11845 ft. RIH to 12126 ft. Circulated at 12126 ft. Oct 14 1996 (25) Held safety meeting. Drilled to 12183 ft. Circulated at 12183 ft. POOH to 9808 ft. Circulated at 9808 ft. POOH to 4629 ft. Pulled BHA. Held safety meeting. Pulled BHA. MU BHA #13. RIH to 2865 ft. Serviced block line. RIH to 12096 ft. Reamed to 12183 ft. Drilled to 12192 ft. Oct 15 1996 (26) Held safety meeting. Drilled to 12277 ft. Held safety meeting. Circulated at 12277 ft. Drilled to 12284 ft. Took MWD survey at 12284 ft. POOH to 11997 ft. RIH to 12284 ft. Circulated at 12284 ft. Pumped out of hole to 11819 ft. POOH to 9800 ft. Circulated at 9800 ft. POOH to 6205 ft. Repaired drawworks. Oct 16 1996 (27) Held safety meeting. Pulled BHA. Removed wear bushing. Tested all functions. Installed wear bushing. Serviced top drive. MU BHA #15. RIH to 8000 ft. Held safety meeting. RIH to 10240 ft. Logged hole with LWD: Formation evaluation (FE) from 10240 ftto 10310 ft. RIH to 12095 ft. Washed to 12284 ft. Drilled to 12341 ft. Fished at 3400 ft. POOH to 10180 ft. Oct 17 1996 (28) Held safety meeting. POOH to 4671 ft. Serviced block line. Serviced top drive. RIH to 12095 ft. Washed to 12341 ft. Drilled to 12363 ft. Held safety meeting. Drilled to 12416 ft. Circulated at 12416 ft. POOH to 12137 ft. Circulated at 12416 ft POOH to 9403 ft. Repaired drawworks. POOH to 8400 ft. Page 4 Oct 18 1996 (29) Held safety meeting. POOH to 4672 ft. Pulled BHA. Serviced drawworks. Pulled BHA. Repaired drawworks. MU BHA #16. RIH to 6020 ft. Took MWD survey at 6020 ft. RIH to 12391 ft. Washed to 12416 ft. Drilled to 12510 ft. Oct 19 1996 (30) Held safety meeting. Drilled to 12578 ft. Held safety meeting. Drilled to 12760 ft. Oct 20 1996 (31) Held safety meeting. Drilled to 12852 ft. Held safety meeting. Drilled to 12940 ft. Circulated at 12940 ft. Oct 21 1996 (32) Held safety meeting. Pumped out of hole to 12200 ft. Circulated at 12200 ft. Pumped out of hole to 9523 ft. Circulated at 9523 ft. Pumped out of hole to 8100 ft. POOH to 4500 ft. Held safety meeting. Repaired drawworks. Pulled BHA, MU BHA #17. Serviced block line. Repaired top drive. RIH to 9226 ft. Reamed to 9400 ft. Oct 22 1996 (33) Held safety meeting. RIH to 12496 ft. Reamed to 12940 ft. Circulated at 12940 ft. POOH to 12400 ft. Circulated at 12940 ft. Pumped out of hole to 12000 ft. POOH to 10000 ft. POOH to 8000 ft. Held safety meeting. POOH to 4978 ft. Pulled BHA. Retrieved wear bushing. RU casing handling equipment. Ran casing to 7600 ft (7 in OD). Oct 23 1996 (34) Held safety meeting. Ran casing to 12860 ft (7 in OD). Ran casing on landing string to 12901 ft. Worked stuck pipe at 12901 ft. RIH to 40 ft. Installed seal assembly. Circulated at 12901 ft. Held safety meeting. POOH to 0 ft. RU tubing handling equipment. Singled in drill pipe to 2100 ft. RU tubing handling equipment. Mixed and pumped slurry- 119 bbl. Circulated at 2114 ft. Pulled drillpipe in stands to 0 ft. Serviced top drive. Installed seal assembly. Laid down 470 ft of 5 in OD drill pipe. Oct 24 1996 (35) Held safety meeting. LD 10825 ft of 5 in OD drill pipe. Held safety meeting. LD 2375 ft of 5 in OD drill pipe. RU BOP stack. Tested BOP stack. MU BHA #17. RIH to 2331 ft. Singled in drill pipe to 2840 ft. Page 5 Oct 25 1996 (36) Held safety meeting. Singled in drillpipe to 12667 ft. Circulated at 12667 ft. Held safety meeting. Tested casing. Drilled cementto 12817 ft. Circulated at 12817 ft. Tested casing. Circulated at 12820 ft. POOH to 4245 ft. Pulled BHA. Oct 26 1996 (37) Held safety meeting. Pulled BHA. RU sub-surface equipment-Formation logs. Ran drillpipe in stands to 9296 ft. RU sub-surface equipment - Other sub-surface equipment. Ran drillpipe in stands to 9670 ft. Repaired Drillstring handling equipment. Held safety meeting. Ran drillpipe in stands to 12800 ft. Conducted electric cable operations. RD sub-surface equipment - Formation logs. Serviced blockline. Pulled drillpipe in stands to 2000 ft. Oct 27 1996 (38) Held safety meeting. Pulled drillpipe in stands to 0 ft. Singled in drillpipe to 1520 ft. Rig waited: Equipment. RU sub-surface equipment - TCP. Ran drillpipe in stands to 1445 ft. Held safety meeting. Ran drillpipe in stands to 12817 ft. Pulled drillpipe in stands to 12550 ft. Perforated from 12246 ft to 12550 ft. Circulated at 12246 ft. Pulled drillpipe in stands to 0 ft. RU sub-surface equipment - Cement retainer. Oct 28 1996 (39) Held safety meeting. Ran drillpipe in stands to 12450 ft. Set packer at 12450 ft with 0 psi. Circulated at 12450 ft. Mixed and pumped slurry- 20.5 bbl. Pulled drillpipe in stands to 11500 ft. Circulated at 11500 ft. Pulled drillpipe in stands to 6000 ft. Held safety meeting. Pulled drillpipe in stands to 0 ft. RU sub-surface equipment - TCP. Ran drillpipe in stands to 11200 ft. Serviced block line. Held safety meeting. Repaired kelly/top drive hose. Perforated from 11120 ft to 11424 ft. Circulated at 11100 ft. Pulled drillpipe in stands to 10000 ft. Oct 29 1996 (40) Held safety meeting. Pulled drillpipe in stands to 0 ft. RD sub-surface equipment - TCP. Ran drillpipe in stands to 11320 ft. Set packer at 11320 ft with 0 psi. Circulated at 11320 ft. Circulated at 11320 ft. Mixed and pumped slurry - 23 bbl. Pulled drillpipe in stands to 10480 ft. Circulated at 10480 ft. Pulled drillpipe in stands to 0 ft. Held safety meeting. Perforated from 10398 ft to 10400 ft. Injectivity test - 6 bbl injected at 900 psi. Ran drillpipe in stands to 6500 ft. MAR 0 5 1997 Aj~sk~ Oil & Gas Cons, Commissior,,. Anchomfl~ Page (~ Oct 30 1996 (41) Held safety meeting. Ran drillpipe in stands to 10300 ft. Set packer at 10300 ft with 0 psi. Mixed and pumped slurry - 41 bbl. Circulated at 10205 ft. Pulled drillpipe in stands to 0 ft. Retrieved wear bushing. Tested BOP stack. Held safety meeting. MU BHA #18. RIH to 10100 ft. Washed to 10286 ft. Drilled cement to 10400 ft. Drilled cement to 11300 ft. Oct 31 '1996 (42) Held safety meeting. Drilled installed equipment - cement retainer. Circulated at 11345 ft. Drilled cement to 11539 ft. Circulated at 11539 ft. Tested casing - via string. Washed to 12434 ft. Held safety meeting. Drilled installed equipment - cement retainer. Washed to 12820 ft. Drilled installed equipment - float collar. Circulated at 12835 ft. Tested casing - via string. POOH to 1690 ft. Pulled BHA. Nov I 1996 (43) Held safety meeting. Pulled BHA. RU rigging equipment. Conducted electric cable operations. Conducted electric cable operations. Conducted electric cable operations. RD logging/braided cable equipment. MU BHA #19. Held safety meeting. RIH to 10950 ft. Circulated at 10950 ft. POOH to 10450 ft. Circulated at 10450 ft. Serviced block line. POOH to 1696 ft. Pulled BHA. RU logging/braided cable equipment. Nov 2 1996 (44) Held safety meeting. Conducted electric cable operations. Held safety meeting. RU lubricator. Perforated from 10296 ft to 10300 ft. RD logging/braided cable equipment. Injectivity test - 3.4 bbl injected at 1600 psi. MU BHA #20. RIH to 6000 ft. Nov 3 1996 (45) Held safety meeting. Serviced mechanical brake. RIH to 12835 ft. Fill pits with brine. Circulated at 12835 ft. Serviced flowline. Filter brine. Flow check. POOH to 1689 ft. Pulled BHA. RU TCP guns. Held safety meeting. RU sub-surface equipment- TCP. Nov 4 1996 (46) Held safety meeting. RU sub-surface equipment- TCP. RU sub-surface equipment - retrievable packer. Ran drillpipe in stands to 10000 ft. Held safety meeting, Ran drillpipe to 12430 ft (3.5 in OD). RU rigging equipment. Conduct braided cable operations - 3/16 size cable. RD logging/braided cable equipment. RU high pressure lines. Set packer at 10202 ft with 0 psi. Held safety meeting. Perforated from 10425 ft to 12400 ft. Reverse circulated at 10210 ft. Fill pits with brine. Page 7 Nov 5 1996 (47) Held safety meeting. Bullhead well. Fill pits with Brine. Circulated at 10202 ft. Circulated at 10202 ft. Flow check. POOH to 10400 ft. Held safety meeting. POOH to 10300 ft. Flow check. LD 7000 ft of drillpipe. RU sub-surface equipment- retrievable packer. Held safety meeting. RD sub-surface equipment - TCP. Nov 6 1996 (48) Held safety meeting. RD sub-surface equipment- TCP. RU drillstring handling equipment. LD 6100 ft of drillpipe. Removed wear bushing. Held safety meeting. RU top ram. Serviced top drive. RU completion string handling equipment. Held safety meeting. Ran tubing to 4800 ft (4.5 in OD). Nov 7 1996 (49) Held safety meeting. Ran tubing to 10085 ft (4.5 in OD). RU tubing hanger. Tested dual control line. Circulated at 10085 ft. Held safety meeting. Circulated at 10088 ft. Set packer at 10031 ft with 4000 psi. Tested tubing. RU hanger plug. RD BOP stack. Installed Xmas tree. Tested adapter spool. Tested all tree valves. RU lubricator. Removed hanger plug. RU high pressure lines. Tested permanent packer. Freeze protect well- 34 bbl of diesel. Nov 8 1996 (50) Held safety meeting. Freeze protect well - 34 bbl of diesel. Installed hanger plug. Rig released 11/07/96 @ 0830 hrs. Page gyro/data ORiGiNAL B.P. EXPLORATION SD! UNIT WELL NO:4-34/O-38 ENDICOTT FIELD, ALASKA Gyro Singleshot Survey Inside 5" Drillpipe Survey date' 22- SEP, 1996 Job number :AK0996G364 SR364. DO gyro/ data Gyr'odata Incorporated P.O. Box 79389 Houston, Texas 77279 713/461-3146 Fax: 713/461-0920 September 27, 1996 B.P. Exploration Petrotechnical Data Center, MB 3-3 P.O. Box 19661-2 Anchorage, AK 99519-6612 Re: SDI UNIT, WELL 4-34/0-38, ENDICOTT FIELD, AK Enclosed please find one (1) original, six (6) copies and two (2) diskettes of the completed survey of Well #4-34/0-38 We would like to take this opportunity to thank you for using Gyrodata and we look forward to serving you in the future. Sincerely, Jack~ Asst. Operations Manager JEM/fec gyro/data CONTENTS JOB NUMBER :AK0996G364 1. DISCUSSION, SURVEY CERTIFICATION SHEET 2. SURVEY DETAILS 3. OUTRUN SURVEY LISTING 4. QUALITY CONTROL 5. EQUIPMENT AND CHRONOLOGICAL REPORT S R364. DE) gyro/data 1. DISCUSSION , SURVEY CERTIFICATION SHEET SR364.DO,:i- gyro/data DISCUSSION JOB NUMBER' AK0996G364 Tool 749 was run in WELL# 4-34/O-38 on ATLAS 15/32" Wireline inside drillpipe, survey was run without problems. SR364.DOL gyro/data SURVEY CERTIFICATION SHEET JOB NUMBER' AK0996G364 The data for this survey and the calculations for this survey were obtained and performed by me according to standards and procedures as set forth by Gyrodata Limited, true and correct to the best of my knowledge. TOM STODDARD OPERATIONS ENGINEER The data and calculations for this survey have been checked by me and conform to the standards and procedures as set forth by Gyrodata Limited. This report represents a directional survey of this well based on the original data obtained at the wellsite. Checked by :- ROB SHOUP OPERATIONS MANAGER SR364.DO' gyro/data 2. SURVEY DETAILS SR364.DOC gyro/data SURVEY DETAILS JOB NUMBER: AK0996G364 CLIENT: B.P. EXPLORATION RIG: DOYAN 15 LOCATION: ENDICOTT FIELD,ALASKA WELL: 4-34/O-38 LATITUDE: 70.324 N LONGITUDE: 14986 W SURVEY DATE: 22 SEP, 1996 SURVEY TYPE: SINGLESHOT IN 5IN. DRILLPIPE DEPTH REFERENCE: MAX. SURVEY DEPTH: ROTARY TABLE ELEVATION 56.0 4122 SURVEY TIED ONTO: NA SURVEY INTERVAL: UTM CO-ORDINATES: TARGET DIRECTION: 81.26 GRID CORRECTION: N/A CALCULATION METHOD: MINIMUM CURVATURE SURVEYOR: TOM STODDARD SR364.DO' gyro/data 3. OUTRUN SURVEY LISTING S R364. DO A Gyro da t a D i r e c t i ona i Survey for B.P. EXPLORATION WELL: 4-34/0-38, 5"DP Location: SDI UNIT, ENDICOTT FIELD, ALASKA Job Number: AK0996G364 Run Date: 22-Sep-96 00:00:00 Surveyor: TOM STODDARD Calculation Method: MINIMUM CURVATURE Survey Latitude: 70.342000 deg. N Sub,-sea Correction from Vertical Reference: 56 ft. Azimuth Correction: Gyro: Bearings are Relative to True North Proposed Well Direction: 81.260 deg vertical Section Calculated from Well Head Location Closure Calculated from Well Head Location Horizontal Coordinates Calculated from Local Horizontal Reference A Gyro d a t a D i r e c t i o na I Survey B.P. EXPLORATION WELL- 4-34/O-38, 5"DP Location- SDI UNIT., ENDICOTT FIELD, Job Number: AK0996G364 ALASKA Page MEASURED DEPTH feet I N C L AZIMUTH VERTICAL DEPTH deg. deg. feet VERTICAL SECTION feet SUBSEA DOGLEG CLOSURE DEPTH SEVERITY DIST. AZIMUTH feet deg./ feet deg. 100 ft. HORIZONTAL COORDINATES feet 0.0 0.00 0.00 0.0 0.0 -56.0 0.00 0.0 0.0 0.0 N 0.0 E (0 .... 4122') A GYRO SINGLE SHOT SURVEY RUN IN DRILLPIPE ALI MEASURED DEPTHS ARE REFERENCED TO DOYAN 15 RKB ELEV.OF 56' 50.0 .71 314.89 50.0 -.2 -6.0 1.41 64.0 .71 304.38 64.0 -.3 8.0 .93 100.0 .75 298.15 100.0 -.6 44.0 .24 150.0 .77 317.31 150.0 -1.1 94.0 .51 1.62.0 .85 306.49 162.0 -1.2 106.0 1.44 .3 314.9 .2 N .2 W .5 313.0 .3 N .4 W .9 307.2 .6 N .7 W 1.6 307.5 1.0 N 1.3 W 1.8 307.9 1.1 N 1.4 W 254.0 1.66 340.82 254.0 -1.9 198.0 1.16 343.0 2.69 349.98 342.9 -2.2 286.9 1.22 400.0 2.83 348.91 399.8 -2.3 343.8 .27 431.0 2.96 347.43 430.8 -2.4 374.8 .48 43]_.0 2.97 347.71 430.8 -2.4 374.8 .00 3.6 319.1 2.7 N 2.4 W 6.8 332.3 6.0 N 3.2 W 9.4 337.2 8.7 N 3.7 W 11.0 338.8 10.2 N 4.0 W 11.0 338.8 10.2 N 4.0 W 52!15.0 2.59 5.11 524.7 -2.0 468.7 .98 61_7.0 2.36 16.38 616.6 -.7 560.6 .59 709.0 2.70 21.56 708.5 1.2 652.5 .45 801.0 2.35 16.80 800.4 3.1 744.4 .44 894.0 1.62 4.31 893.4 4.2 837.4 .91 15.4 19.0 22.6 26.3 29.4 343 .7 349.1 354.3 358.0 359.5 14.7 N 4.3 W 18.6 N 3.6 W 22.5 N 2.3 W 26.3 N .9 W 29.4 N .3 W 9 !0 11 12 13 82.0 2.34 343.45 981.3 4.2 925.3 1.14 00.0 2.51 338.18 999.3 4.1 943.3 1.57 00.0 2.97 335.80 1099.2 2.9 1043.2 .47 00.0 2.59 331.96 1199.1 1.5 1143.1 .42 00.0 2.40 352.10 1299.0 .8 1243.0 .89 32.4 358.8 32.4 N .7 W 33.1 358.4 33.1 N .9 W 37.6 355.7 37.5 N 2.8 W 42.1 353.3 41.9 N 4.9 W 46.3 352.2 45.9 N 6.3 W A Gyro d a t a D i r e c t i o n a i Survey B.P. EXPLORATION WELL. 4-34/0-38, 5"DP Location- SDI UNIT, ENDICOTT FIELD, Job Number: AK0996G364 ALASKA Page MEASURED D E P TH feet I N C L AZIMUTH VERTICAL DEPTH deg. deg. feet VERTICAL SECTION feet SUBSEA DOGLEG CLOSURE DEPTH SEVERITY DIST. AZIMUTH feet deg./ feet deg. 100 ft. HORIZONTAL COORDINATES feet t. 4:00.0 2.34 353.32 1398.9 1_500.0 2.30 353.97 1498.8 1552.0 2.46 355.24 1550.8 1600.0 2.50 358.10 1598.7 1700.0 2.74 357.68 1698.6 .9 1.0 1.2 1.4 1.9 1342.9 1442.8 1494.8 1542.7 1642.6 .08 50.5 352.2 .04 54.5 352.3 .32 56.7 352.4 .27 58.8 352.6 .24 63.3 353.0 50.0 N 6.8 W 54.0 N 7.3 W 56.2 N 7.5 W 58.3 N 7.6 W 62.8 N 7.8 W ]_800.0 3.16 355.40 1798.5 1834.0 3.68 349.76, 1832.4 1900.0 3.76 341.61 1898.3 2000.0 3.30 328.16 1998.1 2115.0 2.45 327.05 2112.9 2.3 2.4 2.0 .3 -2.0 1742.5 1776.4 1842.3 1942.1 2056.9 .44 68.4 353.2 1.82 70.5 353.2 .81 74.7 352.8 .95 80.5 351.5 .74 85.9 349.9 68.0 N 8.1 W 70.0 N 8.3 W 74.1 N 9.4 W 79.7 N 12.0 W 84.5 N 15.0 W 2200.0 2.42 327.04 2197.9 2300.0 2.28 328.84 2297.8 2400.0 .60 354.40 2397.8 2500.0 .44 81.87 2497.7 2600.0 .43 77.68 2597.7 -3.5 -5.1 -5.9 -5.4 -4.7 2141.9 2241.8 2341.8 2441.7 2541.7 .03 89.2 349.0 .16 93.0 348.1 1.76 95.4 347.7 .73 95.9 348.0 .03 95.9 348.5 87.6 N 17.0 W 91.0 N 19.2 W 93.3 N 20.3 W 93.8 N 19.9 W 94.0 N 19.2 W 2700.0 .57 83.31 2697.7 2874.0 .76 99.10 2871.7 3733.0 4.21 83.17 3729.8 3833.0 7.25 82.92 3829.3 3933.0 11.07 83.49 3928.0 -3.8 -1.9 35.1 45.1 61.0 2641.7 2815.7 3673.8 3773.3 3872.0 .15 95.9 349.0 .15 95.4'350.1 .41 99.0 12.0 3.05 102.7 17.3 3.81 110.2 24.9 94.1 N 18.3 W 94.0 N 16.3 W 96.9 N 20.6 E 98.1 N 30.5 E 100.0 N 46.3 E 4030.0 12.79 84.63 4022.9 4122.0 14.96 85.69 4112.2 81.0 103.0 3966.9 4056.2 1.79 121.6 33.0 2.38 136.3 40.4 102.0 N 66.3 E 103.9 N 88.2 E Final. Station Closure- Distance: 136.29 ft Az: 40.35 deg. A Gyro d a t a D i r e c t i ona I Survey for B.P. EXPLORATION WELL: 4-34/0-38, 5"DP Location: SDI UNIT, ENDICOTT FIELD, ALASKA Job Number: AK0996G364SS Run Date: 22-Sep-96 00:00:00 Surveyor: TOM STODDARD Calculation Method: MINIMUM CURVATURE Survey Latitude: 70.342000 deg. N Sub-sea Correction from Vertical Reference: 56 ft. AzimL~th Correction: Gyro: Bearings are Relative te True Nerth Proposed Well Directien: 81.260 deg Verhkcal Sectien Calculated frem Well Head Lecation Clesure Calculated frem Well Head Location Herizental Ceerdinates Calculated frem Local Horizontal Reference A Gyro da t a D i r e c t i o n a i Survey B.P. NXPLORATION WELL- 4-34/O-38, 5"DP Lecation- SDI UNIT, ENDICOTT FIELD, Jeb Number: AK0996G364SS ALASKA SUBSEA I N C L AZIMUTH VERTICAL VERTICAL DOGLEG CLOSURE DEPTH DEPTH SECTION SEVERITY DIST. AZIMUTH feet deg. deg. feet feet deg./ feet deg. 100 ft. .... !56.0 0.00 0.00 0.0 0.0 0.00 0.0 0.0 (0 .... %122') A GYRO SINGLE SHOT SURVEY RUN IN DRILLPIPE ALL MEASURED DEPTHS ARE REFERENCED TO DOYAN 15 RKB ELEV.OF 56' HORIZONTAL COORDINATES feet 0.0 N 0.0 E P~ge i00.0 .81 311.89 156.0 -1.2 .97 1.8 307.7 200.0 1.68 341.03 256.0 -1.9 1.16 6.8 319.4 300.0 2.72 349.73 356.0 -2.2 1.00 9.4 333.4 400.0 2.87 352.38 456.0 -2.3 .26 15.4 340.1 500.0 2.51 8.95 556.0 -1,6 .84 19.0 345.5 600.0 2.50 18.60 656.0 .1 .53 22.6 351.3 700.0 2.52 19.10 756.0 2.2 .44 26.3 356.2 800.0 1.92 9.33 856.0 3.8 .72 29.4 358.9 900.0 2.13 349.45 956.0 4.2 1.07 32.4 359.0 1000.0 2.77 336.83 1056.0 3.4 .95 37.6 356.9 !100.0 2.75 333.62 1156.0 2.1 .44 42.1 354.3 !.200.0 2.48 343.44 1256.0 1.1 .69 46.3 352.7 1.300.0 2.36 352.79 1356.0 .8 .43 50.5 352.2 1400.0 2.32 353.69 1456.0 1.0 .06 54.5 352.3 1500.0 2.47 355.55 1556.0 1.2 .32 58.8 352.4 1600.0 2.63 357.86 1656.0 1.7 .25 63.3 352.8 1700.0 2.98 356.37 1756.0 2.2 .35 68.4 353.1 1800.0 3.71 346.84 1856.0 2.2 1.46 74.7 353.0 1900.0 3.49 333.83 1956.0 1.0 .89 80.5 352.0 2000.0 2.87 327.60 2056.0 -.9 .84 85.9 350.7 1.0 N 1.3 W 2.8 N 2.4 W 6.6 N 3.3 W 11.5 N 4.1 W 16.1 N 4.1 W 20.3 N 3.0 W 24.4 N 1.6 W 28.2 N .5 W 31.5 N .6 W 35.6 N 2.0 W 40.0 N 4.0 W 44.2 N 5.7 W 48.3 N 6.6 W 52.3 N 7.1 W 56.4 N 7.5 W 60.9 N 7.7 W 65.8 N 7.9 W 71.4 N 8.7 W 77.3 N 10.9 W 82.1 N 13.5 W A Gyro da t a D i r e c t i ona I Survey B.P. EXPLORATION WELL- 4-34/0-38, 5"DP Location: SDI UNIT, ENDICOTT FIELD, Job Number: AK0996G364SS ALASKA Page SUBSEA DEPTH feet I N C L .AZIMUTH VERTICAL DEPTH deg. deg. feet VERTICAL SECTION feet DOGLEG CLOSURE SEVERITY DIST. AZIMUTH deg./ feet deg. 100ft. HORIZONTAL COORDINATES feet 2!00.0 2.44 327.04 2156.0 2200.0 2.34 328.08 2256.0 2300.0 1.30 343.72 2356.0 2400.0 .51 195.65 2456.0 2500.0 .43 79.43 2556.0 -2.8 -4.4 -5.5 -5.6 -5.0 38 89.2 349.5 11 93.0 348.5 09 95.4 347.9 16 95.9 347.9 32 95.9 348.3 86.1 N 16.0 W 89.6 N 18.3 W 92.3 N 19.8 W 93.6 N 20.1 W 93.9 N 19.5 W 2600.0 .51 80.96 2656.0 2700.0 .63 88.60 2756.0 2800.0 .74 97.67 2856.0 2900.0 1.10 97.53 2956.0 3000.0 1.50 95.68 3056.0 -4 .2 -3 .2 -2.0 1.8 6.1 .10 .15 .15 .18 .21 95.9 348.8 95.4 349.4 95.4 350.0 99.0 352.3 99.0 354.8 94.0 N 18.7 W 94.1 N 17.7 W 94.0 N 16.5 W 94.3 N 16.7 E 94.6 N 17.2 E 3100.0 1.90 93.82 3156.0 3200.0 2.30 91.96 3256.0 3300.0 2.71 90.11 3356.0 3400.0 3.11 88.25 3456.0 3500.0 3.51 86.39 3556.0 10.4 14.7 19.0 23.3 27.6 .24 .26 .29 .32 .35 99.0 357.4 99.0 359.9 99.0 2.5 99.0 5.0 99.0 7.6 95.0 N 17.7 E 95.3 N 18.2 E 95.6 N 18.7 E 96.0 N 19.2 E 96.3 N 19.7 E 3600.0 3.91 84.54 3656.0 3'700.0 5.0]. 83.10 3756.0 3800.0 8.29 83.08 3856.0 3900.0 11.58 83.83 3956.0 4000.0 13.60 85.02 4056.0 31.9 .38 37.7 1.10 49.4 3.25 66.9 3.22 89.2 2.01 99.0 10.1 102.7 13.4 110.2 19.3 121.6 27.3 136.3 35.7 96.6 N 20.2 E 97.2 N 23.2 E 98.6 N 34.8 E 100.6 N 52.2 E 102.7 N 74.4 E 4056 . 2 14 . 96 85 . 69 4112 · 2 103.0 2.38 136.3 40.4 103.9 N 88.2 E Final Station Closure- Distance. 136.29 ft Az: 40.35 deg. gyro/data 4. QUALITY CONTROL SR364.DO"- gyro/data QUALITY CONTROL REPORT JOB NUMBER: AK0996G364 TOOL NUMBER: 749 MAXIMUM GYRO TEMPERATURE: 93.99C MAXIMUM AMBIENT TEMPERATURE: 33.7C MAXIMUM INCLINATION: 14.96 AVERAGE AZIMUTH: 40.35 WIRELINE REZERO VALUE: REZERO ERROR / K: CALIBRATION USED FOR FIELD SURVEY: 1534 CALIBRATION USED FOR FINAL SURVEY: 1534 PRE JOB MASS BALANCE OFFSET CHECK: -.3 POST JOB MASS BALANCE OFFSET CHECK]: CONDITION OF SHOCK WATCHES .36 USED 0.0 UPON ARRIVAL AT RIG: OK UPON COMPLETION OF SURVEY: OK UPON RETURN TO ATLAS OK BOTTOM LINE COMPARISIONS M.D. INC AZIMUTH "I-VD NORTHING EASTING FIELD SURVEY 4122 14.96 85.69 4112.2 103.9N 88.2E FINAL SURVEY 4122 14.96 85.69 4112.2 103.9N 88.2E SR364.DOq gyro/data 5. EQUIPMENT AND CHRONOLOGICAL REPORT SR364.DQ',' gyro/data EQUIPMENT REPORT JOB NUMBER: AK0996G364 DOWNHOLE ELECTRONICS SURFACE ELECTRONICS PRIMARY TOOL No. 749 GYRO SECTION A0119 DATA SECTION C0002 POWER SECTION C0001 COMPUTER POWER SUPPLY PRINTER INTERFACE A0153 A0074 A0079 A0071 BACKUP TOOL No. 750 GYRO SECTION A0126 DATA SECTION C0025 POWER SECTION C0026 COMPUTER POWER SUPPLY PRINTER INTERFACE A0122 A0074 A0029 A0035 WIRELINE COMPANY: ATLAS WIRELINE CABLE SIZE: 15/32" RUNNING GEAR 2.25" TOTAL LENGTH OF TOOL: 23.5 FEET MAXIMUM O.D.: 2.25 INCHES TOTAL WEIGHT OF TOOL: 210 POUNDS SR364.D© gyro/data CHRONOLOGICAL REPORT JOB NUMBER: AK0996G364 09/17/96 16:30 17:30 18:15 17:45' TRANS TO LOCATION ARRIVE AT LOCATION MU TOOL TOOL WORKING, STANDBY 09/18/96 12:00 STAND BY 09/19/96 12:00 STAND BY 09/20/96 01:00 R.I.H. W/GYRO FIRST ORIENTATION 09/21/96 09/22/96 12:00 RUNNING ORIENTATIONS 09/23/96 13.0 FINISHED W/ORIENTATIONS S R364. DO c Di~ ! LI--I I~ G WELL LOG TRANSMYFr~ To: State of Alaska Alaska Oil and Gas Conservation Comm. Attn.: Loft Taylor 3001 Porcupine Drive Anchorage, Alaska 99501 MWD Formation Evaluation Logs 4-34/O-38, AK-MM-60130 January 30, 1997 The technical data listed below is being submitted herewith. Please acknowledge receipt by returning a signed copy of this of this transmittal letter to the attention of.' Jim Gal~ Sperry-Sun Drilling Services, 5631 Silverado Way, #G, Anchorage, AK 99518 2" x 5" MD Resistivity & Gamma Ray Logs: 50-029-22705-00 2" x 5" TVD Resistivity & Gamma Ray Logs: 50-029-22705-00 2" x 5" MD Neutron Porosity, Density & Gamma Ray Logs: 50-029-22705-00 2" x 5" TVD Neutron Porosity, Density & Gamma Ray Logs: 50-029-22705-00 1 Blueline 1 Rev Folded Sepia 1 Blueline 1 Rev Folded Sepia 1 Blueline 1 Rev Folded Sepia 1 Blueline 1 Rev Folded Sepia 5631 Silverado Way, Suite G · Anchorage, Alaska 99518 · (9.07) 563-3256 · Fax (907) 563-7252 A Dresser Industries, Inc. Company Sl_ nr /-sun m I::t I I__1__ I IM G S E I:::! ~/I I-- El S WEI,I, LOG TRANSMITTAL To: State of Alaska Alaska Oil and Gas Conservation Comm. Attn.: Loft Taylor 3001 Porcupine Drive. Anchorage, Alaska 99501 ~ RE: MWD Formation Evaluation Logs -4-34/0-38 AK-MM-60130 January 29, 1997 The technical data listed below is being submitted herewith. Please acknowledge receipt by returning a signed copy of this transmittal letter to the attention off Jim Galvin, Sperry-Sun Drilling Services, 5631 Silverado Way, CIG, Anchorage, AK 99518 1 LDWG formatted LIS tape with verification listing. APl#: 50-029-22705-00 5631 Silverado Way, Suite G · Anchorage, Alaska 99518 · (907) 563-3256 · Fax (907) 563-7252 A Dresser Industries, Inc. Company 12/9/96 GeoQuest 500 W. International Airport Road Anchorage, AK 99518-1199 A'I'TN: Sherrie NO. 10624 Company: Field: Alaska Oil & Gas Cons Comm Attn: Lori Taylor 3001 Porcupine Drive Anchorage, AK 99501 Endicott (Cased Hole) Well Job # Log Description Date BL RF Sepia LIS Tape 2-08/K-16 MPI PRODUCTION PROFILE W/DEFT 9 61 1 2 5 I 1 ,,, 2-08/K-16 MPI PRODUCTION PROFILE W/DEFT 961 1 25 I 1 2-1 8/L-1 6 PRODUCTION PROFILE W/DEFT 961 I 1 8 I 1 4- 3 4/O-3 8 PRODUCTION PROFILE (DYNAMIC) 9 61 1 1 9 I 1 4- 3 4/O- 3 8 PRODUCTION PROFILE (STATIC) 9 61 1 1 9 I 1 4-34/0-38 DEFT LOG 961 1 1 9 I 1 4-34/0-38 JEWELRY LOG 961 1 1 9 I I PLEASE ACKNOWLEDGE RECEIPT BY SIGNING AND RETURNING ONE COPY EACH TO: BP Exploration (Alaska)Inc. Petrotectnical Data Center MB3-3 900 E. Benson Blvd. Anchorage, Alaska 99519-6612 Date Delivered: Schlumberger GeoQuest 500 W. International Airport Road Anchorage, Alaska 99618-1199 Received by: ~~~ GeoQuest 500 W. International Airport Road Anchorage, AK 99518-1199 ATTN: Sherrie NO. 10577 Company: Field: Alaska Oil & Gas Cons Comm Attn: Lori Taylor 3001 Porcupine Drive Anchorage, AK 99501 Endicott (Cased Hole) 1 1/1 5/96 Well Job # Log Description Date BL RF Sepia LIS Tape 1 - 67IT- 20 PRODUCTION PROFILE 961108 I 1 3-03/J-33 ~ --/.,S,.~:~ 96304 TDTP 961013 I I I ... 4-34/0-38 GR/CCL TCP TIE IN 961103 1 I /.,),,l.- PLEASE ACKNOWLEDGE RECEIPT BY SIGNING AND RETURNING ONE COPY EACH TO: BP Exploration (Alaska) Inc. Petrotectnical Data Center MB3-3 900 E. Benson Blvd. Anchorage, Alaska 99519-6612 Date Delivered: t.lOV 1 5 ~99~0 Ancho~J¢ Schlumberger GeoQuest 500 W. International Airport Road Anchorage, Alaska 99618-1199 Received bCL.' , State of Alaska Alaska Oil & Gas Conservation Comm. Atten: Lori Taylor 3001 Porcupine Drive Anchorage, AK 99501 02-Nov-96 Transmittal of Endicott Final Prints. Please sign and return copy to: Western AItas Logging Services Pouch 340013 Prudhoe Bay, AK 99734-0013 Well Name Services Bluelines i R/F Sepia Film 4-34/O-38 CN/GR/CCL 1 1 4-34/0-38 SBT/GR/CCL 1 1 4-34/0-38 GR/CCL PERF 1 1 ~4-34/O-38 SBT/GR/CCL 1 1 !14-34/O-38 GR/CCL PERF 1 1 !J Received by~~ Contact Rebecca Lange if you have a question concerning this transmittal at (907) 659-2816 or Fax (907) 659-2602. 123/misc/bpend.wkl TONY KNOWLE$, GOVERNOR ~kLASKA OIL A~NII GAS CONSERVATION CO~VlISSION 3001 PORCUPINE DRIVE ANCHORAGE, ALASKA 99501-3192 PHONE: (907) 279-1433 FAX: (907) 276-7542 September 26, 1996 Steve Shultz Senior Drilling Engineer BP Exploration (Alaska) Inc. P O Box 196612 Anchorage, AK 99519-6612 Re'. Duck Island 4-34/0-38 revised BP Exploration (Alaska) Inc. Permit No. 96-155 Sur Loc 2601'NSL, 667'WEL, Sec. 8, T1 IN, R17E, UM Btmhole Loc 3505~-SL, 616'WEL, Sec. 9, T11N, R17E, UM Dear Mr. Shultz: Enclosed is the approved revised application for permit to drill the above referenced well. The provisions of the or/g/hal approved permit dated September 13, 1996 are in effect for this revision. Chairman ~ BY ORDER OF THE CO1VhMISSION dlf/Enclosures CC: Department of Fish & Game, Habitat Section W/o encl Department of Environmental Conservation w/o encl STATE OF ALASKA ALASI'~ OIL AND GAS CONSERVATION COMMISSION PERMIT TO DRILL Revised: 09/19/96 20 AAC 25.005 [] Drill [] Redrill Ilb. Type of well [] Exploratory [] Stratigraphic Test [] Development Oil la. Type of work [] Re-Entry [] Deepen~ [] Service [] Development Gas [] Single Zone [] Multiple Zone 2. Name of Operator 5. Datum Elevation (DF or KB) 10. Field and Pool BP Exploration (Alaska) Inc. Plan RTE = 56' Endicott Field / Endicott Pool 3. Address 6. Property Designation P.O. Box 196612, Anchorage, Alaska 99519-6612 ADL 047503 4. Location of well at surface 7. Unit or Property Name 11. Type Bond (See 20 AAC 25.025) 2601' NSL, 667' WEL, SEC. 8, T11 N, R17E Duck Island At top of productive interval 8. Well Number Number 2S100302630-277 2989' NSL, 3749' WEL, SEC. 9, T11N, R17E 4-34/0-38 Attotal depth 9. Approximate spud date Amount $200,000.00 3505' NSL, 616' WEL, SEC. 9, T11N, R17E 09/15/96 12. Distance to nearest property line113. Distance to nearest well 14. Number of acres in property 15. Proposed depth (MD and TVD) ADL 047505, 3505'I 4-38/K-34, 53.5' at 3349' TVD 2560 13821' MD / 10431' TVD 16. To be completed for deviated wells 17. Anticipated pressure {see 20 AAC 25.035 (e) (2)} Kick Off Depth 900' Maximum Hole Angle 88.9° Maximum surface 4208 psig, At total depth (TVD) 9920' / 5200 psig 18. Casing Program Specifications Setting Depth Size Top Bottom Quantity of Cement Hole Casing Weight Grade Coupling Length MD TVD MD TVD (include stage data) 20" 94# L-80 Weld 80' 41' 41' 121' 121' Driven 12-1/4" 9-5/8" 40# L-80 BTC 4607' 40' 40' 4647' 4616' 1445 sx PF 'E', 560 sx Class 'G' 8-1/2" 7" 26# L-80 BTC 13782' 39' 39' 13821' 10431' 755 sx Class 'G' 19. To be completed for Redrill, Re-entry, and Deepen Operations. Present well condition summary Total depth: measured feet Plugs (measured) true vertical feet Effective depth: measured feet Junk (measured) " true vertical feet Casing Length Size Cemented MD TVD Structural Conductor Surface Intermediate Production Liner Perforation depth: measured true vertical 20. Attachments [] Filing Fee [] Property Plat [] BOP Sketch [] Diverter Sketch [] Drilling Program [] Drilling Fluid Program [] Time vs Depth Plot [] Refraction Analysis [] Seabed Report [] 20 AAC 25.050 Requirements Contact Engineer Name/Number: Chris West, 564-5089 Prepared By Name/Number: Kathy Campoamor, 564-5122 21.1Signedhereby certify that the f~r,,egoing~ i~.tr~~~ the best of my knowledge/~/~~ ~'~_____~ SteveShultz ,." Title Senior Drilling Engineer Date /"J' -- '~Commission Use Only Permit Number I APINumber I Appr°valDate I Seec°verletter ¢.~' .-/,_~, ;~' 50- ~ :P-- ~' -" .2-- ~ ~'4::~,.~- " ¢ --~-/~'~ for other requirements Conditions of Approval: Samples Required [] Yes ~No Mud Log Required [] Yes '~ No Hydrogen Sulfide Measures ~'Ye~ [] No Directional Survey Required ~["Yes [] No Required Working Pressure for BOPE [] 2M; []3M; J~ 5M; [] 10M; [] 15M Other: Original Sigrtso ~y by order of ~' Approved By David W..Inhn~fnn Commissioner the commission Date Form 10-401 Rev. 12-01-85 Submit In Triplicate MEMORANDUM State of Alaska Alaska Oil and Gas Conservation Commission TO: David Johns~.~e~ DATE: Chairn-r~...Q~,>'~ T]~U: Blair Wondzell, ~'~ FILE NO: P. I. Supervisor ~/~ FROM: Doug Amos, '-~O~ ~-~- SUBJECT: Petroleum Inspector September 24, 1996 alhhixdd.doc Confidential: Yes _, No_X, Attachment Only . BOPE Test Doyon 15 DIU SDI 4-34 / 0-38 PTD 96-0155 Tuesday, September 2.4, 1996: i traveled to BPX DIU SD! 4-34 / O-38 well to witness the BOPE Test on Doyon Rig No. 15. Doyon 15 has been stacked all summer and this was the second BOPE test since their start up. I found the rig in good condition and the drilling crew well trained. As the attached AOGCC BOPE Test Report indicates the test went smoothly and there were no failures. The 9 5/8" casing was run without problems and 75 bbl's of good cement was received at surface. Circulation was lost after pumping 49 bbl's of the 61 bbl 15.8 PPG tail cement however the cement to surface did not drop indicating a good cement job. A copy of the BPX morning drilling report covering the events of the cement job is attached for reference. Shared Services Drilling has instituted a new leak off procedure a copy of this new procedure is attached for reference. SUMMARY: I witnessed the successful BOPE test at Doyon Rig No. 15 on BPX DIU SD! 4-34 ! 0-38 well. Attachment: ALHHIXDD.XLS, Morning Drilling Report, SSD Leak Off Procedure. STATE OF ALASKA OIL AND GAS CONSERVATION COMMISSION BOPE Test Report OPERATION: Drlg:. X, , Workover: Drlg Contractor: DOYON Rig No. Operator: .... BPX Well Name: DiU SD/4-34/0-38 Casing Size: g 5/8" Set (~ 4,609 Test:. Initial X Weekly Other DATE: g/24/96 15 PTD # 96-155 Rig Ph.# 659-6770/7,2 , . , Rep.: Eddie, Vau~Thn Rig Rep.: John Welch Location: Sec. 8 T. 11N R. 17E Meridian Umiat Well Sign OK Ori. Rig 6K' Hazard Sec. ~e;s' FLOOR SAFETY VALVES: Quan. Pressure Upper Kelly / IBOP I ! 500/5,000 Lower Kelly / IBOP II 500/5,000 BallType I ! 500/5,000 InsideBOP -f J. 500/5,000 MISC. INSPECTIONS: Location Gen.: OK Housekeeping: OK (Gen) , ~, PTD On Location Yes Standing Order Posted Yes P/F P P ... P P BOP STACK: Annular Preventer Pipe Rams Lower Pipe Rams Blind Rams Choke Ln. Valves HCR Valves Kill Line Valves Check Valve Quan. Test Press. , I 300/3,000 ' Y 50o/5,000 ' 1", 50Q/5,000 N/A P/F Test , P CHOKE MANIFOLD: Pressure P/F P No. Valves I7 I 500/5,000 ! P '/5 No. Flanges I [' 500/5,000 _ J ..p... ' P~ Manual Chokes 1' ~ Functioned ! P P/i5 ' Hydraulic Chokes !, ,! Funclioned t "P '. ACCUMULATOR SYSTEM: System Pressure 3,000 ~ P ..... Pressure After Closure ...... .1, 500 J. '.P .' MUD SYSTEM: Visual Alarm 200 psi Attained After Closure minutes 31 sec. Trip Tank OK OK System Pressure Attained 2' minutes i '51" sec. Pit Level Indicators "'O/~ ' (~K' Blind Switch Covers: Master: Yes Remote: ' Yes Flow Indicator '0K.,, '._oK Nitgn. Btl's: . .~ . 4 {~ 2.500 ' Meth Gas Detector 'OK OK' Psig. H2S Gas Detector OK OK' iNumber of Failures: 0 ,Test Time: 3.5 HOurs. Number °fVaives tested 23 Repair or Replacement of Failed Equipment will be made w~in days. Notify the Inspector and follow with Written or Faxed verification to lthe AOGCC Commission Office at. F~x N~). ' 276-7542 Inspector North Slope Pager No. 659-3607 or 3687 If your call is not returned by the inspector within 12 hours please contact the P. I. Supervisor at 279-1433 I II I J II I II I II I II III [IIl I I II I II I IIJlJllll_l I II I II I ' ' '.' REMARKS: .Rig ?. good condition., good. test.. Distribution: orig-Well File c - Oper./Rig c - Database c - Trip Rpt File c - Inspector 'STATS'WITNESS RE~01RED~ - YES X NO 24 HOUR NOTICE G}VEN YES X NO Waived By: W'rtnessed By: ,, Doug Amos FI-O21L (Rev. 12/94) ALHHtXDD.XLS Morning Drilling Report Operator BP Exploration Well 4-34/O-38 Report 5, page 2 Field Endicott Rig Doyon 15 Date 06:00, 24 Sep 96' 06:00-21:00 06:00-06:30 06:30 06:30-11:00 11:00 11:00-13:00 13:00 13:00-17:30 17:30 17:30-21:00 21:00 21:00-23:00 21:00-21:30 21:30 21:30-23:00 23:00 23:00-03:00 23:00-01:00 01:00 01:00-03:00 03:00 03:00-05:30 03:00-05:30 05:30 05:30- 05:30-06:00 06:00 Run Casing, 9-5/8in O.D. Held safety meeting PJSM-discussed running casing. Completed operations Ran Casing to 4669.0 ft (9-5/8in OD) Ran 113 joints of 9-5/8" 40% L80 buttress casing. Hanger landed Circulated at 4669.0 ft Circulated and reciprocated casing. Land casing on hanger and laid down landing joint. Cleared floor. Obtained clean returns - 150.00 % hole volume Ran Drillpipe to 4582.0 ft (4-1/2in OD) Ran 5" drill pipe in 9-5/8' casing for inter-string cement job. Attempted to screw into float collar with stabilizer in hole. Unable to get stabilizer through crossover on bottom of hanger-. Laid down stabilizer and screwed into float collar. Stopped : To circulate Circulated at 4669.0 ft Circulate and reciprocated casing with 5" drill pipe. Pumped 40 weighted pill with red dye to attempt to estimate hole volume. Cement volume appreared to be adequate. Continued to work pipe while rigging up Halliburton-to cement. Obtained clean returns - 300.00 % hole volume Cement : Casing cement Held safety meeting Held PJSM and discussed interstring cementing procedures. Completed operations Mixed and pumped slurry - 568.000 bbl Test lines. Pum~ 50 bbls water. Mixed and pumped 1312 sxs (507 bbls) of 'E" cement ~ 12 ppg. Switched to 300 sxs (61 bbls) Pr~m{um mixed at 15.8 ppg. Had 75 bbls of good cement returns to surface. Lost circulation with 49 bbl of tail cement pump. Released Wiper plug Displaced drill pipe with rig pumps and bumped drill pipe wiper plug at 2300 hrs. Pull Drillpipe, 5in O.D. Circulated at 4583.0 ft Backed out of screw-in float collar. Picked up 1 joint and circulated out Obtained clean returns - 150.00 % hole volume Pulled Drillpipe in stands to 4582.0 ft Changed out bails and pulled out of hole with drill pipe. Completed operations Nipple down Divertor Rigged down Divertor Clear floor. Nipple down riser and diverter. Equipment work completed Wellhead work Installed Wellhead primary components Installed Split Speed head Assembly. Equipment work completed' Morning Drilling Report Operator BP Exploration Well 4-34/0-38 Report 5, page 1 Field Endicott Rig Doyon 15 Date 06:00, 24 Sep 96' Depth MD Est TVD Casing S~ Casing Depth Daily Mud Cum Mud Daily Well Cum Well 4680.0 ft Hole Size 12-1/4in ROP Pick Up Wt 4648.0 ft Progress 0.0 ft WOB Slack Off Wt 20in Cum Bit Hours RPM Circ Rate Riser 90.0 ft Jar Hours Rotafin~ Wt Circ Rate Hole Torq On Btm Circ On Btm Torq Off Btm Circ Off Btm 3791.SllPumpi Eft i StrokeRate LinerSize Ch'cRate IOperator ' 1 Contractor 25 14216.901 ''(%) i (SPM) (in) CobUaaa) ISer~ce 5 Total 31 220657.001 1 96.00 i 6 [ Supervisor E.E. Vaughn Fluid Type Wa~er Based Mud Density. 9.7 ppg 10 sec gels 37 lbgl00ft^2 MBT 2.5.0 lbfobl Spud Funnel Visc 70 sec/quart 10 rain gels 45 lbf/100ft^2 Fluid Loss 12.40 cc i PV i 1 cP Sofids 9.00 % pH 8.901 YP 36 lbf/100ft^2 HTHP Fluid Prim Lith Trip Gas Cxn Gas Sec Lith Bgrnd Gas Pore Press [EMW]. FIT TVD MAASSP FIT EMW ECD Kick Tol Test Press Casing Test Days Since Last BOP Test ;. }Pmnp !0.7 PPg! i Stroke Rate ($PM) 'Drill Accumulator Kick While Tripping Kick While Drilling Fire H2S Date Run LTA Today No 23:30, 19 Sep 96 Days SinceLast LTA 385 15:00, 21 Sep 96 Accident/Inddent Today No 02:00, 22 Sop 96 Days Since Last Acc/Inc 10 12:00, 22 Sep 96 Acc/Inc Report Filed No 04:00, 24.Sep 96 Spill No Spill Type Spill Vol Last Safety Mtg i Barite 0.00 bbl ;Bentonite 0.00 bbl 'Potable Water 0.00 bbl Drill Water 350.00 bbl Base Oil 0.00 bbl Rig Fuel 10002.00 bbl Helifuel 0.00 bbl Kill Mud 0.00 bbl Cement 1 - Neat 0.00 bbl Wind Speed 11 knot Wind Direction Visibility 8.0 mile Temperature Sea Height Wave Period Sea Direction Max Current Barometer Chill Factor Weather State 53.00 deg 24 degF Depth Insmunent Type o No.i Head From No. 0 To Diam 0 0 Time Rec g~ (%) Inclination Azimuth:i Survey Type 0 0 · 7::~='~ ~ ~.r~.--~ a~- ~:~;:~:~i::;~ ::::::::::::::::::::::::: ~ ......... - :;:~ ~;'' :':": ' : ':'~':;";~ No spills or accidents Rig accepted at 1200 hrs on 9-19-96 Received 0 gallons of fuel from PBU topping plant Received 350 bbls H20 from Veto Lake 385 days since last LTA 299 clays since last spill I0 days since last accident 2 PJSM LEAK OFF TEST PROCED URE STANDARD OPERATING PROCEDURE OBJECTIVE Shared Services Drilling policy, in Section 8.2, specifies: Leak Off or Formation Integrity Tests will be performed as per SSD Recommended Practices after drilling out casing or liner shoe and 10 feet of new formation (except for conductors) unless otherwise noted in the well plan. Corrective measures will be performed if the open hole pressure integrity fails to meet pre-determined standards. The Recommended Practices manual further def'mes this specification in two places: RP- Surf Hole Page 3 and RP-Intermediate Hole Page 4. In RP-Surf Hole section, steps 14 & 15 on page 3 contain the general procedure for conducting a LOT below surface casing. On RP-Intermediate Hole Page 4, the entire page is given to a discussion of performing an FIT or a LOT below intermediate casing. PROCEDURE The LOT procedure is further detailed in the following discussion. NOTE: .This discussion is applicable for development wells only! For explanation of these steps or a discussion about interpretation of the results, refer to the BP Well Control Manual in Sections 4.6 d.8. A pressure recorder chart is required for all pressure tests and must be clearly labeled before being sent to the SSD office for inclusion in the well file. Suitable gauges for the anticipated pressure range which have been recently calibrated should be used, unless previous test results have validated the accuracy of a rig's digital gauges. Also, if a rig pump cannot be run at a steady low rate (0.25 0.5 bpm), use of a cementing pump should be considered. 1. Assess the upper limit of the test. The absolute upper limit for all types of tests will be the overburden gradient at 1 psi/ft. If the test is being conducted on an intermediate string, consider the casing pressure test or blowout preventer pressure limitations. 2. Determine the estimated fracture pressure. If this is unknown, consult with the Drilling Superintendent. A mud logging company can provide data for earl/er wells and the previous wells' records should provide some expectation for the estimated pressure. 3. Test the casing prior to drilling out the float collar. SSD Reco~nmended Practices June 1996 The anticipated volume to pressure up the casing can be estimated from the formula in Section 4.7 of the BP Well Control Manual. Run the mud pump at a constant 0.25--0.5 bpm. One-stroke pressure readings are recommended, but in all cases record pressures in at least five-stroke increments. If the pressures are increasing rapidly enough to make this reading too large, take pressure readings at 30-second intervals. Plot the results for reference during the following LOT. when the required test pressure is reached, suspend pumping and hold the test pressure for thirty minutes. Check that the test is being accurately recorded on a chart. 4. Drill cement, float collar, float shoe and 20'-50' of new hole. 5. Circulate bottoms up to condition the mud to a constant mud weight. 6. Pull into the casing shoe. . Close a blowout preventer. . 8. Run the mud pump at a constant 0.25 or 0.5 bpm. 10. Match the pump rate to the one used during the previous casing pressure test. Monitor the pressure build-up and accurately record the volume of mud pumped. Plot the pressure versus volume of mud pumped. Stop the pump when any deviation from linearity is noticed. Record the f'mal pump pressure and calculate the equivalent mud weight: Note .and record the bleed-off pressure in thirty-second intervals for five minutes. Bleed back mud from the well and compare with the volume pumped. Note the LOT results on the IADC ~heet and note on next morning's report. Send the leak-off test plot and pressure recorder charts to the office to be stored with the rest of the reports in the well ffie. If taking the pressure to full leak-off is not required (as is common in many developmental wells) or is deemed to be detrimental (such as doing a LOT in a brittle formation that would be weakened by going to full leak-off), an Equivalent Mud Weight Test (commonly known as a "jug test") can be conducted, with proper approvals, to just below anticipated leak-off pressure. 1. Determine the required surface pressure. In the case of a surface casing shoe, a 12.5 ppg EMW should be sufficient unless the well plan notes differently. 2. Test the casing prior to drilling out the float collar. Run the mud pump at a constant 0.25 0.5 bpm and record results as discussed in the above procedure for the LOT. SSD Recommended Practices June 1996 3. Drill remaining cement, float collar, float shoe and 10' of new hole. 4. Circulate bottoms up to condition the mud to a constant mud weight. 5. Pull into the casing shoe. 6. Close a blowout preventer. 7. Run the mud pump'at a constant 0.25 - 0.5 bpm.- Match the pump rate to the one used during the previous casing pressure test. 8. Stop the pump when the required test pressure is reached. Close appropriate valves if surface leaks are suspected. 9. Hold and record the pressure for five minutes. Check to ensure that the chart recorder is accurately recording the test. 10. Bleed back mud from the well and compare with the volume pumped. Note the jug test results on the IADC sheet and note on next moming's report. Send the test plot and pressure recorder charts to the office to be stored with the rest of the reports in the well file. If there arise any questions from these procedures, consult with your appropriate Drilling Superintendent. SSD Recommended Practices June 1996 Hazards: · Pressure: Abnormal~ hiah pre_ssures of up to 5000 psi may be encountered in the 3C due to gas injection approximately 1600' downdip of the target loc.~tion at well 3-47/Q-35, Pressure in the 3B is un(~ertain, and range from 2900 to 4500 psi. Estimated sand[ace pressure based on average 1995 wellhead inject[on pressure is shown In Seotlon III (right). · Gas'. The top of the Kekiktuk is not prognosied to be close to the odginal GOC. No secondary gas cap is expected. Mud: Equivalent mud wt. in the pilot hole a~mss 3B of 10.5 lb/gal, possible. Faults: Possible fault in HAW to the SE of N-37. Geologic Notes Kick Tolerance: 64 bbls 12.5 LOT (ref 4-34/0-38) and 10.2 MW. Close approach ' 4-38 / K-34 well will be shu{-in while drilling to 491.7. H2S: There has been H2S at both MPI and SDI. Lost Circulation: No recent loses have occurred on the MPI. Stuck Pipe: Practice Good Stuck Pipe Prevention Procedure. RECEIVED SEP 2 4 1996 Naska 011 & Gas Cons. C0mmissio~ Anchorage MEMORANDUM TO: David Chairmah" State of Alaska Alaska Oil and Gas Conservation Commission DATE: September 19, 1996 THRU: Blair Wondzeil, ~ FILE NO: P. I. Supervisor ~/~ ekhhisdd.doc Confidential: Yes _, No,X, Attachment Only . . FROM: Doug Amos, "c~5 (~'~,-' SUBJECT: Petroleum Inspector Diverter Test- Doyon 15 BPX DIU SDI 4-3410-38 PTD # 96-0155 Thursday,. September 19, 1996: I traveled to BPX's DIU SDI 4-34 / 0-38 well to inspect diverter system and witness the function test. As the attached AOGCC Diverter System Inspection Report indicates the diverter system was installed properly and all equipment in compliance. The rig was clean and all equipment in good condition. The location was clean, well organized and there was clear access to all areas of the rig. .Summary: i witnessed the successful function test and found the diverter system in compliance on Doyon rig 15 at BPX DIU SD! 4-34 / 0--38 well. Attachment: EKHHISDD.XLS STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMMISSION Diverter Systems Inspection Report Operation: Development Drlg Contractor: DOYON Rig No. 15 PTD # Operator: BPX - ENDICOTT, ~ . . Oper. Rep.: Well Name: SDI 4-34 / 0-38 Rig Rep.: Location: Sec. 8 T 11 N R. 17 E Merdian Umiat Date: X Exploratory: 9/19/96 96-155 Rig Ph. # 659-6510/11 Eddie Vaughn John Welch MISC. INSPECTIONS: ACCUMULATOR SYSTEM: Location Gen.: OK Well Sign: Yes Housekeeping: OK (Gen.) Drlg. Rig: OK Reserve Pit: N/A Flare Pit: N/A DIVERTER SYSTEM INSPECTION: Diverter Size: 20" Divert Valve(s) Full Opening: Yes Valve(s) Auto & Simultaneous: Yes Vent Line(s) Size: 12 Vent Line(s) Length: Line(s) Bifurcated: Yes Line(s) Down Wind: Yes Line(s) Anchored: Yes Tums Targeted / Long Radius: Yes in. in. 180' / 90' ft. Systems Pressure: 3,000 psig Pressure After Closure: 1,800 ... psig 200 psi Attained After Closure: ._.__. min. 28 sec. Systems Pressure Attained: 1 min. 30 sec. Nitrogen Bottles: . . 4 Bo,ttle,s 2,700 PSI A~g. . psig MUD SYSTEM INSPECTION: Light Alarm Trip Tank: OK OK Mud Pits: OK OK Flow Monitor: OK OK OAS DETECTORS: Light Alarm Methane OK OK Hydrogen Sulfide: OK OK .~~0' of 12" Vent Line : , ~__ : Well Row,~3 12" Manual Knife 90 12" Vent Line Valves PrevailingNORTHwinds/NE to SW Non Compliance Items __._.__ Repair Items Wi'ahin Day (s) And contact the Inspector @ 659-3607 Remarks: Clean location, alt equipment in good condition. Distribution Orig. - Well File c - Oper/Rep c - Database c - Trip Rpt File c - Inspector AOGCC REP.: OPERATOR REP.: EKHHISDD.XLS Doug Amos Eddie Vaughn DVTRINSP.XLT (REV. 1/94) I Well Name: 14-34 / 0-38 Well Plan Summary I Type of Well (producer or injector): I Producer iSurface Location: Target Location: Bottom Hole Location: 2601 FSL 667 FEL S08 T11N R17E UM 2989 FSL 3749 FEL S09 T11N R17E UM 3505 FSL 616 FEL S09 T11N R17E UM I AFENumber: 1727106 I Rig: I DOYON 15 I Estimated Start Date: I09/17/96 IOperating days t°complete:128 IMD: I13821 I ITVD: 110431 I [KBE: 156 IWell Design (conventional, slimhole, etc.): IULTRASLIMHOLE HORIZONTAL Formation Markers Horiz()ntal Well Bore: Formation Tops MD TVD (SS) RESERVOIR PRESSURE UPPER SV SHALE 3300 3250 BASE UPPER SV TOP SV MARINE SHALE BASE SV MARLINE SHALE SV-5 4272 4200 BASE SV-5 4637 4550 TOP UGNU TOP WEST SAK TOP SEABEE/AYLYAK TOP SHALE WALL/TUFFS 9330 9050 TOP HRZ 9883 9585 BASE HRZ 10252 9840 TOP PUT RIVER 9840 BASE PUT RIVER (LCU) 9862 LCU /ITKILYARIAK 10252 9862 KEKIKTUK FLOW 5 10493 9920 3700- 5200 psi FLOW 4 12980 10,010 FLOW 3 13134 10,075 FLOW 2 13290 10,141 2900 - 4500 psi FLOW 1 13548 10,250 SUBZONE 3A3(P3) 10,333 4600 psi Casinc/Tubinq Proqram: Hole Csg/ Wt/Ft Grade Conn Length Top Btm Size Tbg O.D. MD/I'VD MD/TVD NA 20" 94 L-80 WLD 80 41 121/121 . 12.25 9.625" 40 L-80 BTC 4607 40 4647/4616 8.5 7.000" 26 L-80 BTC 13782 39 13821/10431 TBG 4.5 12.6 13 Cr NSCT 10362 38 10400/9967 4-34 / O-38 Drilling Program 9/19/96 Logging Proqram: I Open Hole Logs: Surface Hole Production Hole 15° Build section Horizontal section MWD Directional MWD Directional Only to 15° Build section MWD Directional, GR MWD Directional, GR, Res, Den, Neutron Porosity Bit Program Bit Size Bit Type Depth Out ROP WOB RPM ( MTR & TD) 12.25 MAISL 4500 150 10 - 35 180 - 250 8.5 GT-CPS09D 7400 100 30 180 - 250 8.5 AG526 9381 100 5-10 180 - 250 8.5 MF15ODCL 10021 50 25 180 - 250 8.5 (2 BITS) ATJ-CPS33D 10493 20 45 180 - 250 8.5 ATJ-PS22D 11000 40 30 180 - 250 8.5 MF10ODLC 12626 40 25 180 - 250 Mud Program: ISpecial design considerations JRefer to change over procedure to displace mud to Drill in fluid. Surface'Mud Properties: I SPUD Density Marsh Yield 10 sec 10 min pH Fluid (PPG) Viscosity Point gel gel Loss 8.5 225 35 - 55 25 - 55 40 - 65 9 12 - 22 to to to to to to to 9.5 100 20 - 45 15 - 25 20-40 8.5-9.5 12 - 22 Drill this interval with a standard Aquagel/Xtend mud having an initial viscosity of 225 sec/qt. Maintain this viscosity until the large gravel has been drilled. When the amount of gravel lessens at the flowline, the viscosity can be slowly relaxed to a final viscosity of 100. High pump rates are important in this size hole to assist in hole cleaning. Past wells have had success in the 600-760 gpm range. Run all solids control equipment to keep the abrasive solids to a minimum. Additions of Condet(drilling detergent) may be needed for bit bailing and/or shaker screen blinding in the lower section of the interval. Prior to tripping out for the casing, the viscosity should be no lower than 100. Thinning the mud with dilution and Desco while circulating the casing should assist the displacement procedure and lessen the cement channeling. Hazards/Concerns: No special hazards anticipated. Intermediate Mud Properties: Subject to change based on actual drilling results. Density Marsh Yield 10 sec 10 min pH Fluid (PPG) Viscosity Point gel gel Loss 8.8 - 9.6 36 - 45 8 - 12 3 - 6 6 - 12 9 - 9.5 8 - 12 After setting the surface casing,dump and clean pits,saving approximately 150 bbls spud mud which will be watered back. This diluted fluid will be blended with the fluid in the well to form the base fluid for the LSND system. After drilling out the casing, treat out the cement contamination and establish filtration and rheological properties using PAC products. Maintain the pH in the 9.0 range using caustic soda. Supplement the hole cleaning with regular pumping of high viscosity sweeps consisting of Biozan. 4-34 / O-38 Drilling Program 9/19/96 The density should start out in the8.8- 9 ppg range. At 9200' begin weighting up mud and ensure the weight is 9.6 by 9700 MD. Use all solids control equipment and dilution to hold the weight in the desired range. Begin additions of 2#/bbl each of Baranex and Barotrol at approximately 8000 MD. This will lower the filtration rate from the 7-8 cc range to the 4-6 cc range and help stabilize any shales encountered. Maintain this range for the remainder of this interval. If a PDC bit is to be run, pretreat the system with l#/bbl of Condet prior to tripping for this bit to minimize the potential for bit bailing. Maintenance with the Condet and SAPP are recommended. The tangent section of this hole can be considered straight so the need for lubricants should be minimal. If torque or drag become a problem here, l-2ppb of Torq Trim II and/or EP Mudlube are recommended, depending on the source of the problem. Hazards/Concerns: Treat with shale stabilizers. Use soap and SAPP for bit bailing. Potential for need of lubricants. Use high vis sweeps to assist in hole cleaning. Higher mud weights may be required for hole stabilization and/or gas. Monitor pit volumes and flow closely. Maintain an adequate stock of LCM on location at all times. Horizontal Mud Properties: Subject to Drill in fluid change based on actual hole drilling results. Density Marsh Yield 10 sec LSR-YP LSRV Fluid (PPG) Viscosity Point gel cps Loss 10.2 50-65 20 - 24 8 - 12 7 - 11 + 15,000 +6 Chlorides mg/liter + 10,000 K:N ratio >__1 A 2% KCL Sheardriln system will be displaced into the hole at 9886 MD. Utilize N-vis to maintain the Bingham yield point and Iow shear rate yield point in the specified ranges. Daily calculations of Tau O should be performed by the mud engineer to assure agreement with the Iow shear rate YP. Brookfield data will be reported for comparison purposes only. Maintain the APl filtration rate < 6.0 cc with additions of CAT 300 and N-Dril Lo. These maintenance additions should be made at a 4 to 1 ratio,CAT 300 to N-Dril LO. High viscosity sweeps should be mixed using N-Dril Hi, a high molecular weight polymer~ If sliding problems or drag are experienced, treat the system with EP Mudlube at a concentration of 1%.Do not use Lubetex in the Sheardriln system due to incompatibility. Use Baracarb for dry jobs,not KCL as there's a 12,000 ppm hardline maximum on chlorides. Chlorides are needed in this range to facilitate the logging program, 8,000 to 10,000 ppm should be considered the ideal chloride content. A disPlacement procedure is attached which can be modified at the rig to accommodate rig operations and time savings. Hazards/Concerns: Potential for lost circulation dictates adequate supplies of LCM on location. Lubricants for sliding, drag, and torque. Maintain chlorides in 8,000 to 10,000 range. Do not use KCL in dry jobs. Monitor pit volumes and flow closely. Maintain Baracarb inventories sufficient to weight up at least .7ppg. 4-34 / 0-38 Drilling Program 9/19/96 Open hole displacement procedure Prior to beginning the 15 degree build at 9886 MD, reduce the yield point of the LSND system to the 8 to 10 range, and trip to the surface casing shoe to prepare the rig pit system to receive the 2% KCL drill-in fluid from the Baroid mudplant and to build the Iow viscosity and high viscosity spacers. Dump and clean the rig pits and flush all pump and solids control equipment lines with fresh water. Take the KCL fluid into the pits and displace after tripping back to bottom according to the following procedure: 1)Pump a 50 barrel Iow viscosity sweep consisting of a mud from the LSND system which has had the Bingham yield point reduced to 6 lb/100 sq ft through additions of chrome free Desco. 2)Pump a 50 barrel high viscosity spacer consisting of N-Vis mixed to a Bingham yield point of 35 to 45, (approximately 2.5 ppb), and weighted to 9.6 ppg with barite. Proper manipulation of pH to ensure proper polymer dispersion and hydration along with slow mixing of the polymer will prevent the formation of polymer fish eyes. 3) Once the high viscosity spacer is away, begin displacing with the 2% KCL fluid. Pump at the highest practical rate possible and rotate and reciprocate the drill string to provide turbulence in the annulus and to disturb any solids which might be laying on the Iow side of the well bore. 4)Monitor flow line returns for break through of the spacers and the KOL fluid. Discard the Iow viscosity and high viscosity spacers as they will be contaminated with unwanted drill solids and cuttings which might compromise the integrity of the KCL drill-in system. Any of the suggestions in the beginning paragraph can be changed to better utilize rig time. Casing and Cementing' In th'e past the standard casing program has been the slimhole design which utilized 10 3/4" casing for the surface hole and 7 5/8" casing for the Iongstring. Now the next step in the evolution of casing size leads us to a 9 5/8" surface string and a 7" production long string. Going to the smaller casing should benefit the drilling program in a variety of ways and yet maintain the same parameters needed for production. A cost savings should be realized through less casing costs, less bit costs, higher penetration rates, less rig time, reduced cement costs and less disposal costs due to the reduced volume of cuttings. Cementing the surface-casing will involve the use of a stab-in assembly which will give us more probability of getting cement to surface. It is imperative that good returns are evident when the surface hole is at TD. If for any reason there are any losses at surface. TD, those losses must be dealt with and full returns must be established prior to pulling out of the hole with the drill pipe. Under no circumstances should the drill pipe be pulled from the hole if partial losses still exist. See attached cement volume summary. Centralizer Placement: The 9 5/8" casing will require 10 centralizers to be placed on the first 10 joints in the hole. The 7" casing will require 2 straight blade centralizers per joint from 12529' to 9396'. The total number of centralizers for the 7" will be 155. 4-34 / O-38 Drilling Program 9/19/96 Well Control: Well control equipment consisting of 5000 psi W.P. pipe rams, blind rams, and annular preventer will be installed and is capable of handling maximum potential surface pressures. Diverter, BOPE and drilling fluid system schematics on file with AOGCC. Directional: I KOP: I Surface nudge, KOP at 3600' MD I IMaximum Hole Angle: I 16'° in surface and 88.9° in Horizontal Close Approach Well:1 4-38 / K-34 is 77 feet at 4517 TVD The above listed wells will be secured during the close approach. Deep well intersections NONE. The directional on this well involves a horizontal section without drilling a pilot hole. The control will be very critical as the well is drilled. The surface hole has one close approach issue on well 4-38/K-34 which will be shut in. Several other wells do not exceed the close approach criteria but are close and will require a constant vigilance by the directional driller to prevent drilling over any hard lines. The surface hole will have a slight nudge to 3° at 300 feet to avoid a close well issue. The hole will then be drilled down to the next kickoff point at 3500' where it is to be built to 16.5° at 2.5°/100'. The azimuth must be 82° during this build. All of the critical hard lines occur in this surface hole and must be watched closely. The surface hole is to be drilled to 4647' and the 9 5/8" casing run and cemented. The 8 1/2" hole will be drilled from the 9 5/8" shoe at 16.8° of angle and at 9930' MD the angle is to be built at 15°/100, up to 65° with an azimuth of 80°. This angle will be held to a depth of 10252' and then built up further at 8°/100' up to 89° with an azimuth of 80°. Note: A pilot hole has not been drilled and the control as to where the tops of formations are will be determined as the production hole is drilled. Therefore, the top of the Itkilyariak is predicted to come in at 9862' TVD (10252' MD) and the hole angle should be _+65°. If at this point it is determined that the Itkilyariak is Iow then the angle should be held at 65° until the harder formation (Itkilyariak) is encountered and bulling angle can resume. After building to 75° the bottom of the Itkilyariak should be seen with a definite increase in penetration rate. If at 75° the bottom of the Itkilyariak has not been encountered then hold the 75° until a noticable penetration rate increase is observed and then continue building to 89° in the Kekiktuk sand at _+9986' TVD. The 89° angle is to be held to a measured depth of _+12743 MD where the angle will be dropped to 65° at 8°/100' and maintain an 80° azimuth. The well will then be drill to 13820'MD TD and 7" casing is to be run. Disposal: Annular Injection: All cuttings will be hauled off location. There will not be any annular injection for this well. 4-34 / O-38 Drilling Program 9/19/96 . . . . . . . . ,, 10. 11. 12. 13. 14. 15. 16. 17. 4-34 / 0-38 Proposed Summary of Operations Drill and set 20" conductor. Prep location for rig move. MIRU Doyon 15. Complete pre spud checklist and accept rig. NU and function test divertor system. Ensure the divertor is as per AOGCC specifications and is approved by the AOGCC supervisor. Build spud mud volume. Drill 12.25" surface hole as per directional plan and with short trips as required. Use gyro for close approach as per JORPS. Expected TD of surface hole is 4647' MD. Run and cement 9.625" 40 ppf casing. Cement using screw -in cement collar (See attached operations summary), reciprocate casing while pumping cement as long as possible. Pump lead cement until we have cement to surface and the switch to tail slurry. ND divertor and NU and test BOP. Run wear bushing. RIH w/8.5" bit and performance PDM (motor). Test the 9.625" casing to 3000 psig and plot pressure vs volume for LOT baseline. Drill out float equipment and 20 feet of new formation, Perform a LOT to a maximum of 12.5 ppg as per NEW Recommended Practices Manual. Record pressure vs. cumulative volume for LOT test for well file. Ensure the mud is suited for high angle wells with lubrication, monitored for Torque and drag. Follow Pad Data Sheet short trip guidelines. Note: The 9 5/8" casing will be set in sand, therefore, higher pump rates may be needed to obtain a LOT. Drill 8.5" hole to final build up point at the top of the HRZ at _ 9,883' MD (9636 ' TVD) with conventional Directional Drilling tools and LSND mud using real time MWD to confirm the top of the Kekiktuk at _ 10493 feet. Change over to 2% Sheardrill- N system as per attached procedure. Drill 8.5" hole final build up to target entry point at _ 10557' MD (9986 'TVD) with Meduim Radius Directional Drilling tools using real time MWD GR/Resitivity correlation to soft land at 88.93° in the Flow 5. Drill 8.5" high angle tangent sectionhole to 2nd target at 12,743' MD (10016 ' TVD), then drop angle to 65° with an 80.62° azimuth and drill to TD at ___13,821' MD,(10431' TVD) using resistivity and porosity tools to stay in the desired section of the Flow sands. Make wiper trip, CBU, POOH. Pull Wear Bushing. Run and Cement 7.000" casing to _+13,821'. Make sure there is a circulating head for the topdrive before starting to run 7.000" casing. Closely monitor casing running loads for drag. Cement to 1000 feet above the top of the Kekiktuk. WOC 12 hours and make clean out run to PBTD with 3 1/2" drill pipe. Perforate with DPCP gun with intervals to be picked from LWD logs by geologist. Perforating program to follow. 4-34 / O-38 Drilling Program 9/19/96 18. 19. 19. 20. RIH with bit and 7", 26# scraper 100' past depth the Baker "WD" packer is to be set. POOH, PU 7" "WD" packer, RIH and set as per Endicott PE. POOH and LD 3 1/2" drill pipe. PU and RIH with 4.5" chrome completion with Production packer, 6 GLM and SSSV to set tail pipe at + 10,400. ND BOP and NU completion tree. Freeze protect, set BPV, close valves. Test tree, and Hand over well to Pes. Recommended Practice for Running Tubing Post Rig Work · Freeze protect with diesel to 1500'. · Install all bull plugs and gauges in the wellhead and casing valves. Clean up well house. · Send handover information to PE department Completion Detail WLEG Above the top of the 3A subzone at 12,200' 10' pup joint X or SWN nipple with RHC plug pinned not to shear. 10' pup joint 10' pup joint X or SWS nipple 10' pup joint 10' pup joint 7-5/8 Packer Baker S-3 packer 10' pup joint X or SWS nipple 10' pup joint bottom GLM (8600TVDSS) 10' pup joint GLM's and tubing as shown on space out table 10' pup joint SSSV landing nipple 1500' 10' pup joint tubing space out pups as needed 1 joint of tubing XO if needed 6'- 10' pup joint tubing hanger landing joint GLM SPACING STATION 1 2 3 4 5 6 TVD(ss) 8600 7900 7200 6500 5250 3500 GLV Type w/dummy RP Shear valve 4-34 / O-38 Drilling Program 9/19/96 Freeze Protection: The 9 5/8" x 7" annulus will be freeze protected with diesel down to 1500' 1) 2) 3) Drillpipe Perforating Procedure Hold pre job safety meeting with crews before P/U perforating guns. Review H2S risks, spill prevention, and well control. While making up the guns make sure that only essential personnel are present on the rig floor. Rig up tank away from rig and plumbed to accept returns from the well. (Dike and berm the tank) While picking up and running the perforating guns and associated tools (firing heads etc.) there should be only essential personnel on the rig floor (driller, perforating crew and packer hand). All other personnel will stay off of rig floor until the perforating equipment is below the rotary table. Perforating guns will be run with hand slips (not air slips). It is imperative that all slip dies be inspected prior to running the guns. (Dies that are dull will tend to let the guns slip and catch causing the charges within to shift and possibly rotate out of the scalloped area of the gun) 4) MU Perforating/underbalanced assembly in the following order: Absolute pressure firing head Perforating guns & blanks, as per production specs. Differential Pressure Firing Head 2-7/8" PAC 6.4# L-80 tubing (from Doyon 14 if the rig doesn't have any) Below Packer Safety Joint Bypass Port Champ III Packer ( To be set in the 7-5/8" casing @ < 60° hole inclination) Hydraulic underbalance valve Jars PR FAS-FIL Valve 3- 1/2" DP to surface (as required to space out above the liner top) Notes: · Schlumberger will provide BHA detail diagram. · Caliper all tool lengths and OD's. · Have the 2-7/8" PAC tubing inspected prior to every job and do not run pup joints in the 2 7/8" segment. · Insure that the packer setting depth will not be in an area that exceeds 60° of inclination or an area of high dog leg severity. · Space out packer by allowing LC to be tagged w/firing head. Pickup and place bottom shot at the requested depth. · In order to set guns on depth with drillpipe measurement, a strap of the cleanout string is essential. · Below Packer safety joint should be set to shear @ 70K#. · Pin PR FAS-FIL valve to shear at hydrostatic pressure required to achieve desired underbalance. Set valve to give a desired underbalance. Shear pressure = Reservoir pressure-underbalance. 5) RIH w/assembly on DP. Note TVD and MD at which PR FAS-FIL valve is set to shear. Stop at this depth, close annular, and pressure annulus to 400 psi. No flow up DP indicates valve has closed. If valve has not closed, release pressure and repeat. Fill drill pipe with fluid to this point. Continue in hole with dry pipe. In the event the PR-FAS-FIL is not actuating properly, POOH and investigate (do not continue RIH). 6) Tag LC w/firing head and position guns on DPM. 4-34 / O-38 Drilling Program 9/19/96 7) 8) 9) 10) 11) 12) 13) 14) Set the Champ III packer with 1/4 turn (at tool) to the right and 20K# down weight. R/U HOWCO flow head. Shoot fluid level inside DP to verify fluid level, shut annular on drill pipe. Ensure that the hard line to the outside tank is ready by having a visual inspection done from the floor manifold all the way through to the tank. Aisc dedicate one person to monitor the tank and the outside lines during the flow period and while reversing out any produced fluids. Pressure test all lines to 3000 psi. Fire the guns by pressuring up on the annulus to +_2500 psi. Monitor guns firing with the fluid level equipment. Once guns have fired bleed annulus pressure to 500 psi. If the differential firing head fails, the absolute firing head will be pinned to fire at +2000 psi applied at surface on the tubing. Prior to firing the absolute firing head, it will have to be determined whether underbalance is necessary, if so, then the string will have to be pressured up with nitrogen to 2000 psi and then bled off during the delay period of 15 minutes before the guns fire. If underbalance isn't a factor then fill tubing, open the packer by-pass, and circulate around to ensure the underbalance valve is open. Once that is established, close the by-pass valve and pressure up tubing to 2000 psi and bleed off to zero during the 15 minute delay period. Note: All guns can be run with the Absolute Firing Head with the exception of the 2 1/2" guns. Flow well and monitor with the fluid level indicator every 5 minutes and by the amount of blow in the bucket. Take any returns to the outside tank. Bleed off the pressure on the annulus. PU 20K to open by pass and reverse out tubing two tubing volumes, flowing produced fluids to the outside tank. Unseat packer, monitor well for flow or losses and allow the packer elements to relax prior to pulling out of the hole. POOH and monitor fill-ups closely, when the first gun is to surface have a short safety meeting reiterating to the crew that the guns could possibly have trapped gas and that extreme caution is needed when breaking connections (especially the blanks between spent guns). LD perforating guns and insure that the hole is kept on continuous fill. Establish that all guns have fired and if they haven't then again only essential personnel will be on the rig floor to dismantle the guns. RD equipment of perforating personnel and lay guns out for removal. Inspect and report all shots fired or misfired. Please perforate the following interval with Schlumberger charges (4.5", 5 SPF, EJ 51B with 60° phasing). Perforated well 500-800 psi underbalanced Peforation intervals will be determined from logs. References: · Recommended Practice for Surface Hole V1.0 12-20-94 · Standard Operating Procedure for LOT V1.0 June 1996 · Recommended Practice for Production Hole-Long String V0.0 5-2-94 · Recommended Practice for Running Tubing V3.2 12-20-94 · Prudhoe Bay Drilling 13 Chrome Handling & Running Procedure June 1993 Revision. 4-34 / O-38 Drilling Program 9/19/96 1111 East 80fh Avenue Anchorage, Alaska 99518 (907) 349-4511 FAX (907) 344-2160 09/17/96 Shared Services Drilling Doyon Rig 15 Endicott SDI, Well 4-34/0-38 (P10) Well Plan Summary Well 4-34/O-38 (P10) is a grass roots, high angle well. It is targeting the Kekiktuk flow unit 5 formation. The well bore will be drilled with 12-1/4" steerable assemblies to the surface casing point 10' tvd below the SV5 shales; 8-1/2' assemblies will drill the tangent to the 15/100, and 8/100 build into the target formation, continuing through the high angle tangent, and drop at the end of the section to the TD. The TD is at 10375' ss. Critical points: MD INC AZ TVD DLS Hole Size Nudge Build 1/100 End 1/100 Build Nudge Drop 1/100 End 1/100 Drop KOP Curve 2.5/100 End 2.5/100 Curve 9-5/8" Casing Point Curve 15°/100' End Curve / Top Itkilyariak Curve 8/100 End 8/100 Curve / .Target End Target / Drop 12/100 End 12/100 Drop TD / 7" Liner Point 300 0.00 350.00 300 1 12-1/4' 600 3.00 350.00 600 12-1/4" 2110 3.00 350.00 2108 1 12-1/4" 2410 0.00 350.00 2408 12-1/4' 3500 0.00 82.81 3498 2.5 12-1/4" 4160 16.51 82.81 4149 12-1/4" 4648 16.51 82.81 4616 12-1/4" 9930 16.51 82.81 9681 15.00 8-1/2" 0252 64.82 80.92 9918 8-1/2' 0252 64.82 80.92 9918 8 8-1/2" 0557 89.21 80.62 9986 8-1/2" 2743 89.21 80.62 10016 12 8-1/2" 2945 65.00 80.62 10061 8-1/2" 3821 65.00 80.62 10431 8-1/2" Points of Contact: Scott DeLapp, Work Phone 349-4511, Pager 268-4283 AKADPC Planner Rig Phone 659-6510 Doyon 15 / Drilling Supervisor Chris West, Work Phone 564-5089 SSD Engineer (Rig D15) ANADRILL AKA-DPC APPROVED SEP 1 7 1996 Anadrill Schlumberger Alaska District 1111 East 80th Avenue Anchorage, AK 99518 (907) 349-4511 Fax 344-2160 DIRECTIONAL WELL PLAN for SHARED SERVICES DRILLING Well ......... : 4-34/0-38 (P10) (HA Well) Field ........ : Endicott, SDI Computation..: Minimum Curvature Units ........ : FEET Surface Lat..: 70.32189899 N Surface Long.: 147.86197665 W Legal Description Surface ...... : 2601 FSL 667 FEL TARGET (1)...: 2989 FSL 3749 FEL TARGET (2)...: 3344 FSL 1592 FEL BHL .......... : 3505 FSL 616 FEL LOCATIONS - ALASKA Zone: 3 X-Coord Y-Coord S08 TllN R17E UM 270370.53 5970816.26 S09 TllN R17E UM 272578.00 5971137.00 S09 TllN R17E UM 274744.00 5971427.00 S09 TllN R17E UM 275724.57 5971558.29 Prepared ..... : 17 Sep 1996 Vert sect az.: 350.00 KB elevation.: 56.00 ft Magnetic Dcln: +28.883 (E) Scale Factor.: 0.99995990 Convergence..: -1.75330608 PROPOSED WELL PROFILE ANADRILL AKA-DPC ,APPROVED SEP 1 ? 1996 INITIAL~ _~ ,]]LO-- STATION MEASURED INCLN IDENTIFICATION DEPTH ANGLE KB 0.00 0.00 NUDGE BUILD 1/100 300.00 0.00 400.00 1.00 500.00 2.00 END 1/100 BUILD 600.00 3.00 DIRECTION VERTICAL-DEPTHS AZIMUTH TVD SUB-SEA 0.00 0.00 -56.00 350.00 300.00 244.00 350.00 399.99 343.99 350.00 499.96 443.96 350.00 599.86 543.86 SECTION COORDINATES -FROM DEPART WELLHEAD 0.00 0.00 N 0.00 E 0.00 0.00 N 0.00 E 0.87 0.86 N 3.49 3.44 N 7.85 7.73 N ALASKA Zone 3 X Y 270370.53 5970816.26 270370.53 5970816.26 0.15 W 270370.40 5970817.12 0.61 W 270370.03 5970819.71 1.36 W 270369.40 5970824.03 TOOL DL/ FACE 100 100R 0.00 100R 0.00 100R 1.00 100R 1.00 100R 1.00 EST BASE PERMAFROST NUDGE DROP 1/100 1457.31 3.00 2110.00 3.00 2200.00 2.10 2300.00 1.10 2400.00 0.10 END 1/100 DROP 2410.00 0.00 350.00 1456.00 1400.00 350.00 2107.79 2051.79 350.00 2197.70 2141.70 350.00 2297.66 2241.66 350.00 2397.66 2341.66 350.00 2407.66 2351.66 52.72 86.88 90.88 93.68 94.72 94.73 51.92 N 85.56 N 89.50 N 92.25 N 93.28 N 93.29 N 9.15 W 270362.97 5970868.43 100R 0.00 15.09 W 270358.07 5970902.24 100R 0.00 15.78 W 270357.49 5970906.20 100R 1.00 16.27 W 270357.09 5970908.96 100R 1.00 16.45 W 270356.94 5970910.00 100R 1.00 16.45 W 270356.94 5970910.'01 100R 1.00 (Anadrill (c)96 O38P10 3.0b.06 11:02 AM P) 4-34/0-38 (P10) (HA Well) 17 Sep 1996 Page 2 PROPOSED WELL PROFILE STATION IDENTIFICATION TOP UPPER SV SHALE KOP CURVE ~.5/100 END 2.5/100 CURVE TOP SV5 SHALE/SAND MEASURED INCLN DEPTH ANGLE 3308.34 0.00 3500.00 0.00 3600.00 2.50 3700.00 5.00 3800.00 7.50 3900.00 10.00 4000.00 12.50 4100.00 15.00 4160.44 16.51 4272.05 16.51 DIRECTION VERTICAL-DEPTHS AZIMUTH TVD SUB-SEA 350.00 3306.00 3250.00 350.00 3497.66 3441.66 82.81 3597.62 3541.62 82.81 3697.40 3641.40 82.81 3796.80 3740.80 82.81 3895.63 3839.63 82.81 3993.70 3937.70 82.81 4090.83 4034.83 82.81 4149.00 4093.00 82.81 4256.00 4200.00 SECTION DEPART 94.73 94.73 94.62 94.30 93.77 93.02 92.06 90.90 90.09 88.53 COORDINATES-FROM ALASKA Zone 3 WELLHEAD X Y 93.29 N 16.45 W 270356.94 5970910.01 93.29 N 16.45 W 270356.94 5970910.01 93.57 N 14.29 W 270359.11 5970910.21 94.38 N 7.80 W 270365.62 5970910.83 95.75 N 3.00 E 270376.46 5970911.86 97.65 N 18.09 E 270391.60 5970913.30 100.09 N 37.45 E 270411.02 5970915.15 103.06 N 61.03 E 270434.68 5970917.40 105.11 N 77.31 E 270451.02 5970918.96 109.08 N 108.78 E 270482.59 5970921.96 TOOL DL/ FACE 100 100R 0.00 7R 0.00 7R 2.50 HS 2.50 HS 2.50 2.50 2.50 2.50 2.50 0.00 BASE SV5 SHALE/SAND 9-5/8" CSG PT TOP TUFFS TOP MRZ START 15/100 CURVE BASE HRZ / PUT RIVER EST OGOC EST CGOC END 15/100 CURVE ITKILYARIAK / LCU START 8/100 CURVE 4637.10 16.5]. 4647.53 16.51 9330.64 16.51 9888.65 16.51 9930.19 16.51 10000.00 26.98 10100.00 41.97 10200.00 56.97 10206.36 57.93 10234.40 62.13 10247.67 64.12 10252.31 64.82 10252.31 64.82 10252.31 64.82 10300.00 68.63 82.81 4606.00 4550.00 82.81 4616.00 4560.00 82.81 9106.00 9050.00 82.81 9641.00 9585.00 82.81 9680.82 9624.82 81.89 9745.58 9689.58 81.34 9827.78 9771.78 81.04 9892.58 9836.58 81.02 9896.00 9840.00 80.96 9910.00 9854.00 80.93 9916.00 9860.00 80.92 9918.00 9862.00 80.92 9918.00 9862.00 80.92 9918.00 9862.00 80.87 9936.84 9880.84 83.44 83.30 17.95 10.17 9.59 8.58 7.04 5.49 5.40 4.98 4.78 4.72 4.72 4.72 4.03 122.06 N 211.71 E 122.43 N 214.66 E 288.92 N 1535.14 E 308.76 N 1692.48 E 310.23 N 1704.20 E 313.72 N 1729.79 E 322.00 N 1785.62 E 333.64 N 1860.51 E 334.47 N 1865.81 E 338.28 N 1889.79 E 340.14 N 1901.48 E 340.80 N 1905.62 E 340.80 N 1905.62 E 340.80 N 1905.62 E 347.73 N 1948.87 E 270585.87 5970931.78 HS 0.00 270588.82 5970932.06 HS 0.00 271913.73 5971058.06 HS 0.00 272071.60 5971073.08 HS 0.00 272083.35 5971074.19 2L 0.00 272109.03 5971076.89 272165.09 5971083.46 272240.31 5971092.80 272245.63 5971093.48 272269.71 5971096.54 252281.45 5971098.05 272285.61 5971098.58 272285.61 5971098.58 272285.61 5971098.58 272329.04 5971104.19 1L 15.00 IL 15.00 IL 15.00 IL 15.00 iL 15.00 iL 15.00 1L 15.00 1L 15.00 1L 15.00 1L 8.00 END 8/100 CURVE 10400.00 76.63 10500.00 84.63 10557.27 89.21 (Anadrill (c)96 O38P10 3.0b.06 11:02 AM P) 80.77 9966.66 9910.66 80.67 9982.93 9926.93 80.62 9986.00 9930.00 2.68 1.44 0.79 362.96 N 2043.01 E 378.86 N 2140.30 E 388.15 N 2196.71 E 272423.60 5971116.53 iL 8.00 272521.34 5971129.44 IL 8.00 272578.oo 5Ni,t.,.F,~Ibi%?LL ~s 8.0o AKA-DPC APPROVED 8EP 1 7 1996 INITIAL ~,~ 4-34/0-38 (P10) (HA Well) 17 Sep 1996 Page 3 STATION IDENTIFICATION TARGET (1) ********* TOP KEKIKT~K/FLOW 5 EST COWC START 12/100 DROP TARGET (2) ********* END 12/100 DROP TOP FLOW UNIT 4 TOP FLOW UNIT 3 MEASURED INCLN DEPTH ANGLE 10557.27 89.21 10557.27 89.21 12742.89 89.21 12742.89 89.21 ~2742.89 89.21 12800.00 82.36 12900.00 70.36 12944.67 65.00 12980.90 65.00 13134.70 65.00 EST TOP TAR 13170.19 65.00 TOP FLOW UNIT 2 13290.87 65.00 EST OOWC 13394.98 65.00 TOP FLOW UNIT 1 13548.79 65.00 TOP ZONE 3A3(P3) 13721.52 65.00 TD / 7" LINER POINT 13820.90 65.00 PROPOSED WELL PROFILE DIRECTION VERTICAL-DEPTHS AZIMUTH TVD SUB-SEA 80.62 9986.00 9930.00 80.62 9986.00 9930.00 80.62 10016.00 9960.00 80.62 10016.00 9960.00 80.62 10016.00 9960.00 80.62 10020.19 9964.19 80.62 10043.73 9987.73 80.62 10060.69 10004.69 80.62 10076.00 10020.00 80.62 10141.00 10085.00 80.62 10156.00 10100.00 80.62 10207.00 10151.00 80.62 10251.00 10195.00 80.62 10316.00 10260.00 80.62 10389.00 10333.00 80.62 10431.00 10375.00 SECTION DEPART -22.89 -22.89 -22.89 -23.50 -24.55 -25.00 -25.36 -26.87 -27.22 -28.40 -29.42 -30.93 -32.63 -33.61 COORDINATES-FROM WELLHEAD 388.15 N 2196.71 E 388.15 N 2196.71 E 744.30 N 4352.92 E 744.30 N 4352.92 E 744.30 N 4352.92 E 753.57 N 4409.08 E 769.38 N 4504.78 E 776.11 N 4545.54 E 781.46 N 4577.93 E 804.18 N 4715.46 E 809.42 N 4747.20 E 827.25 N 4855.11 E 842.62 N 4948.20 E 865.34 N 5085.73 E 890.85 N 5240.19 E 905.53 N 5329.05 E ALASKA Zone 3 TOOL DL/ X Y FACE 100 272578.00 5971137.00 HS 8.00 272578.00 5971137.00 HS 8.00 274744.00 5971427.00 LS 0.00 274744.00 5971427.00 LS 0.00 274744.00 5971427.00 LS 0.00 274800.42 5971434.55 LS 12.00 274896.56 5971447.43 LS 12.00 274937.50 5971452.91 HS 12.00 274970.04 5971457.26 HS 0.00 275108.19 5971475.76 HS 0.00 275140.07 5971480.03 HS 0.00 275248.47 5971494.54 HS 0.00 275341.99 5971507.06 HS 0.00 275480.15 5971525.56 HS 0.00 275635.30 5971546.33 HS 0.00 275724.57 5971558.29 0.00 ANADRILL AKA-DPC APPROVED SEP 1 ? 'BgB [NII[AL ~'~ .~ (Anadrill (c)96 O38P10 3.0b.06 11:02 AM P) SHARED SERVICES DRILLING VERTICAL SECTION VIEW i Section at: 350.00 TVD Scale.' ~ 1nch = 300 feet -' Dep Scale.' ~ inch : 300 feet B Drawn · ~7 Sep ~9 i /nadri]] Schlumberger Marker Identification MD BKB SECTN INCLN C ' ' A) KB 0 0 0 0.00 B) NUDGE BUILD ]/]00 300 300 0 0.00 C) END ~/]00 BUILD 600 600 8 3.00 - D) NUDGE DROP ~/~00 2~0 2~08 87 3.00 E) END ~/~00 DROP 24~0 2408 95 0.00 F) KOP CURVE 2,5/~00 3500 3498 95 0.00 G) END 2.5/100 CURVE 4160 4149 90 16.5! H) 9-5/8" CS6 PT 4648 4616 83 J6.51 I) START 15/100 CURVE 9930 968~ t0 t6.5~ J) END 15/t00 CURVE 10252 9918 5 64.82 -- K) START 8/t00 CURVE 10252 9918 5 64.82 L) END 8/100 CURVE 10557 9986 I 89.21 M) TARGET (fl ~~ 10557 9986 1 89.2~ N) START 12/100 DROP 12743 10016 -23 89.21 O) TARGET (2) **~***~** 12743 10016 -23 89.21 P] END ~2/100 DROP 12945 1006! -25 65.00 Il) TD / 7" LINER POINT 13821 10431 -34 65.00 ........... '[~'%~ 'P~sr - ~ , A ~! ~, h~'l I AKA-DPC , ,PF RO SEP1 995 .. -300 -150 0 t50 300 450 600 750 900 ~050 1200 1350 ~500 ~650 Sect ion Depanture (Anadri]] (c]96 038P~0 3.0b.06 ~:29 ~ P) t800 , 4-34/0-38 (P'IO) (HA We1_1) PLAN VlE~ CLOSURE · 5405 feet at Azimuth 80.36 BI OI !El FI SHARED ..... SERVTCES ,DRZLLTNG ....... IECLINATION' +28.883 {E) ;CALE · 1 inch = 100 feet IRAWN · 17 Sep 19 i i ii ill i i i i i i i illll - larker Identification MD N/S E/N ...................... ,) KB 0 0 N 0 E I) NUDGE BUILD 1/100 300 0 N 0 E :) END 1/100 BUILD 600 8 N 1 ~ ANA,DRILL AKA-[~PC ., o,o ,,,oo ,,. 'Fr':_ :) END 1/100 DROP 2410 93 N 16 ) KOP CURVE 2.5/~00 3500 93 N ;) END 2.5/~00 CURVE 4~60 ~05 N 77 E ............... I} 9-5/8" CSG PT 4648 122 N 215 E ~ ,, _ ..... - I) END iS/J00 CURVE ~0252 34J N ,~ END 8/~00 CURVE ~0557 388 I) TARGET (t) ~*~.N~M~ 10557 388 N 2197 E I) START t2/100 DROP 12743 744 N 4353 E ~) TARGET (2) ......).~ 12743 744 N 4353 E ') ENO 12/100 OROP 12945 776 N 4546 E l) TD / 7' LINER POINT 13821 906 N 5329 E ....... .... ~ .... , , ,, 100 50 0 50 100 150 <- WEST ' EAST -> (Anadril] (c)96 038P10 3.0b.06 $~:2g AM P) ;5O ,00 300 250 150 2qO 250 300 350 400 450 500 550 600 650 ii ii i i i 700 750 800 I' Anadrill Schlumberger Alaska District 1111 East 80th Avenue Anchorage, AK 99518 (907) 349-4511 Fax 344-2160 DIRECTIONAL WELL PLAN for SHARED SERVICES DRILLING Well ......... : 4-34/0-38 (P10) (HA Well) Field ........ : Endicott, SDI Computation..: Minimum Curvature Units ........ : FEET Surface Lat..: 70.32189899 N Surface Long.: 147.86197665 W Legal Description Surface ...... : 2601 FSL 667 FEL TARGET (1)...: 2989 FSL 3749 FEL TARGET (2)...: 3344 FSL 1592 FEL BHL .......... : 3505 FSL 616 FEL LOCATIONS - ALASKA Zone: X-Coord S08 TllN R17E UM 270370.53 S09 TllN R17E UM 272578.00 S09 TllN R17E UM 274744.00 S09 TllN R17E UM 275724.57 3 Y-Coord 5970816.26 5971137.00 5971427.00 5971558.29 Prepared ..... : 17 Sep 1996 Vert sect az.: 80.62 KB elevation.: 56.00 ft Magnetic D¢ln: +28.883 (E) Scale Factor.: 0.99995990 Convergence..: -1.75330608 PROPOSED WELL PROFILE ANADRILL AKA-DPC APPROVED SEP 1 ? '11t[18 mmmmmmmmmmmmmmmmmmmm mmmmmmmm mmmmmm STATION MEASURED INCLN IDENTIFICATION DEPTH ANGLE KB 0.00 0.00 NUDGE BUILD 1/100 300.00 0.00 · 400.00 1.00 500.00 2.00 END 1/100 BUILD 600.00 3.00 EST BASE PERMAFROST NUDGE DROP 1/100 1457.31 3.00 2110.00 3.00 2200.00 2.10 2300.00 1.10 2400.00 0.10 END 1/100 DROP 2410.00 0.00 mmmmmmmmm mmmmmmmmmmmmmm~mm DIRECTION VERTICAL-DEPTHS AZIMUTH TVD SUB-SEA mmmm~mmmm mmmmmmmm mmmmmmmm 0.00 0.00 -56.00 350.00 300.00 244.00 350.00 399.99 343.99 350.00 499.96 443.96 350.00 599.86 543.86 350.00 1456.00 1400.00 350.00 2107.79 2051.79 350.00 2197.70 2141.70 350.00 2297.66 2241.66 350.00 2397.66 2341.66 350.00 2407.66 2351.66 mmmmmmmm SECTION DEPART 0.00 0.00 -0.01 -0.04 -0.09 mmmmmmmmmmmmmmmmmmmmm mmmmmmmmmmmmmmmmmmm~ mmmm mmmm COORDINATES-FROM ALASKA Zone 3 TOOL DL/ WELLHEAD X Y FACE 100 mmmmmmmmmm mmmmmmmmmm mmmmmmmmm mmmmmmmmmm mmmm m.m* 0.00 N 0.00 E 2?0370.53 5970816.26 100R 0.00 0.00 N 0.00 E 2?03?0.53 5970816.26 100R 0.00 0.86 N 0.15 W 270370.40 5970817.12 100R 1.00 3.44 N 0.61 W 270370.03 5970819.71 100R 1.00 7.73 N 1.36 W 270369.40 5970824.03 100R 1.00 -0.57 51.92 N 9.15 W 270362.97 5970868.43 100R 0.00 -0.94 85.56 N 15.09 W 270358.07 5970902.24 100R 0.00 -0.98 89.50 N 15.78 W 270357.49 5970906.20 100R 1.00 -1.02 92.25 N 16.27 W 270357.09 5970908.96 100R 1.00 -1.03 93.28 N 16.45 W 270356.94 5970910.00 100R 1.00 -1.03 93.29 N 16.45 W 270356.94 5970910.01 100R 1.00 (Anadrill (c)96 O38P10 3.0b.06 11:30 AM P) 4-34/0-38 (P10) (HA Well) 17 Sep 1996 Page 2 PROPOSED WELL PROFILE STATION IDENTIFICATION TOP UPPER SV SHALE KOP CURVE ~5/100 END 2.5/100 CURVE TOP SV5 SHALE/SAND MEASURED INCLN DEPTH ANGLE 3308.34 0.00 3500.00 0.00 3600.00 2.50 3700.00 5.00 3800.00 7.50 3900.00 10.00 4000.00 12.50 4100.00 15.00 4160.44 16.51 4272.05 16.51 DIRECTION VERTICAL-DEPTHS AZIMUTH TVD SUB-SEA 350.00 3306.00 3250.00 350.00 3497.66 3441.66 82.81 3597.62 3541.62 82.81 3697.40 3641.40 82.81 3796.80 3740.80 82.81 3895.63 3839.63 82.81 3993.70 3937.70 82.81 4090.83 4034.83 82.81 4149.00 4093.00 82.81 4256.00 4200.00 SECTION COORDINATES-FROM DEPART WELLHEAD -1.03 93.29 N 16.45 W -1.03 93.29 N 16.45 W 1.15 93.57 N 14.29 W 7.69 94.38 N 7.80 W 18.57 95.75 N 3.00 E 33.77 97.65 N 18.09 E 53.26 100.09 N 37.45 E 77.01 103.06 N 61.03 E 93.41 105.11 N 77.31 E 125.10 109.08 N 108.78 E ALASKA Zone 3 TOOL DL/ X Y FACE 100 270356.94 5970910.01 100R 0.00 270356.94 5970910.01 7R 0.00 270359.11 5970910.21 7R 2.50 270365.62 5970910.83 HS 2.50 270376.46 5970911.86 HS 2.50 270391.60 5970913.30 HS 2.50 270411.02 5970915.15 HS 2.50 270434.68 5970917.40 HS 2.50 270451.02 5970918.96 HS 2.50 270482.59 5970921.96 HS 0.00 BASE SV5 SHALE/SAND 9-5/8" CSG PT TOP TUFFS TOP HRZ START 15/100 CURVE 4637.10 16.51 4647.53 16.51 9330.64 16.51 9888.65 16.51 9930.19 16.51 82.81 4606.00 4550.00 228.78 82.81 4616.00 4560.00 231.74 82.81 9106.00 9050.00 1561.70 82.81 9641.00 9585.00 1720.17 82.81 9680.82 9624.82 1731.97 122.06 N 211.71 E 122.43 N 214.66 E 288.92 N 1535.14 E 308.76 N 1692.48 E 310.23 N 1704.20 E 270585.87 5970931.78 HS 0.00 270588.82 5970932.06 HS 0.00 271913.73 5971058.06 HS 0.00 272071.60 5971073.08 HS 0.00 272083.35 5971074.19 2L 0.00 BASE HRZ / PUT RIVER EST OGOC EST CGOC END 15/100 CURVE ITKILYARIAK / LCU START 8/100 CURVE 10000.00 26.98 10100.00 41.97 10200.00 56.97 10206.36 57.93 10234.40 62.13 10247.67 64.12 10252.31 64.82 10252.31 64.82 10252.31 64.82 10300.00 68.63 81.89 9745.58 9689.58 1757.79 81.34 9827.78 9771.78 1814.22 81.04 9892.58 9836.58 1890.01 81.02 9896.00 9840.00 1895.38 80.96 9910.00 9854.00 1919.65 313.72 N 1729.79 E 322.00 N 1785.62 E 333.64 N 1860.51 E 334.47 N 1865.81 E 338.28 N 1889.79 E 80.93 9916.00 9860.00 1931.50 ' 340.14 N 1901.48 E 80.92 9918.00 9862.00 1935.68 340.80 N 1905.62 E 80.92 9918.00 9862.00 1935.68 340.80 N 1905.62 E 80.92 9918.00 9862.00 1935.68 340.80 N 1905.62 E 80.87 9936.84 9880.84 1979.48 347.73 N 1948.87 E 272109.03 5971076.89 272165.09 5971083.46 272240.31 5971092.80 272245.63 5971093.48 272269.71 5971096.54 272281.45 5971098.05 272285.61 5971098.58 272285.61 5971098.58 272285.61 5971098.58 272329.04 5971104.19 1L 15. O0 1L 15. O0 1L 15. O0 1L 15. O0 1L 15. O0 1L 15.00 1L 15.00 1L 15.00 1L 15.00 1L 8.00 END 8/100 CURVE 10400.00 76.63 10500.00 84.63 10557.27 89.21 (Anadrill (c)96 O38P10 3.0b.06 11:30 AM P) 80.77 9966.66 9910.66 80.67 9982.93 9926.93 80.62 9986.00 9930.00 2074.85 2173.43 2230.60 362.96 N 2043.01 E 272423.60 5971116.53 1L 378.86 N 2140.30 E 272521.34 5971129.44 1L 388.15 N 2196.71 E 272578.00 5971137.00 HS ANADRILL AKA-DPC APP¢OVED SEP 1 7 1996 8.00 8.00 8.00 4-34/O-38 (Pl0) (HA Well) 17 Sep 1996 Page 3 STATION MEASURED INCLN IDENTIFICATION DEPTH ANGLE TARGET (1) ********~ 10557.27 89.21 . TOP KEKIKTUK/FLOW 5 10557.27 89.21 EST COWC 12742.89 89.21 START 12/100 DROP 12742.89 89.21 TARGET (2) ********* 12742.89 89.21 END 12/100 DROP TOP FLOW UNIT 4 TOP FLOW UNIT 3 12800.00 82.36 12900.00 70.36 12944.67 65.00 12980.90 65.00 13134.70 65.00 EST TOP TAR 13170.19 65.00 TOP FLOW UNIT 2 13290.87 65.00 EST OOWC 13394.98 65.00 TOP FLOW UNIT I 13548.79 65.00 ToP ZONE 3A3(P3) 13721.52 65.00 TD / 7" LINER POINT 13820.90 65.00 PROPOSED WELL PROFILE DIRECTION VERTICAL-DEPTHS AZIMUTH TVD SUB-SEA 80.62 9986.00 9930.00 80.62 9986.00 9930.00 80.62 10016.00 9960.00 80.62 10016.00 9960.00 80.62 10016.00 9960.00 80.62 10020.19 9964.19 80.62 10043.73 9987.73 80.62 10060.69 10004.69 80.62 10076.00 10020.00 80.62 10141.00 10085.00 80.62 10156.00 10100.00 80.62 10207.00 10151.00 80.62 10251.00 10195.00 80.62 10316.00 10260.00 80.62 10389.00 10333.00 80.62 10431.00 10375.00 SECTION DEPART 2230.60 2230.60 4416.02 4416.02 4416.02 4472.94 4569.94 4611.25 4644.08 4783.48 4815.64 4925.01 5019.37 5158.77 5315.31 5405.38 COORDINATES-FROM WELLHEAD 388.15 N 2196.71 E 388.15 N 2196.71 E 744.30 N 4352.92 E 744.30 N 4352.92 E 744.30 N 4352.92 E ALASKA Zone 3 X Y 272578.00 5971137.00 272578.00 5971137.00 274744.00 5971427.00 274744.00 5971427.00 274744.00 5971427.00 753.57 N 769.38 N 776.11 N 781.46 N 804.18 N TOOL DL/ FACE 100 HS 8.00 HS 8.00 LS 0.00 LS 0.00 LS 0.00 4409.08 E 274800.42 5971434.55 LS 12.00 4504.78 E 274896.56 5971447.43 LS 12.00 4545.54 E 274937.50 5971452.91 HS 12.00 4577.93 E 274970.04 5971457.26 HS 0.00 4715.46 E 275108.19 5971475.76 HS 0.00 275140.07 5971480.03 275248.47 5971494.54 275341.99 5971507.06 275480.15 5971525.56 275635.30 5971546.33 809.42 N 4747.20 E 827.25 N 4855.11 E 842.62 N 4948.20 E 865.34 N 5085.73 E 890.85 N 5240.19 E 905.53 N 5329.05 E 275724.57 5971558.29 HS 0.00 HS 0.00 HS 0.00 HS 0.00 HS 0.00 0.00 AKA-DPC ANADRILL APPROVED SE.? 1 ? 1996 (Anadrill (c)96 O38P10 3.0b.06 11:30 AM P) I. SERVICES Dr,i'LLING i 9001 960( 10800 °-- * ..... ! 4-34/0-38 (P~IO} (HA Well) "-- VERTICAL SECTION VIEW Section at: 80.62 TVD Scale.' I inch = ~200 feet ~o-- ,, Der Scale.' 1 inch = 1200 feet Dra~n · 17 Sep 19 o -- il .... , ,4nadni ] ] Sch]umbengen, , -- HO~ Z~ 0.00° ~ ~ 0-00°, ~ ~ 0,00° ~ ~ 3.00° ~ ~ 350.00°, HO~ I~ 3.00°, ~ ~ 350-00~,  ~ 600' ~ 21100' 24[0' DROP 0--~ ~ [L[~" ' ~ 3.OO° ~ ~O-OO° ~ 350'000' ........ ~ 2~08 )_ _ ~ ~ 9930' 10252' ~ 150/100' DL~ )- ~i.,~ ............ ~.~..~ ........... : ...... ~ -~ ..... :::--' . . .81° lO.g2· · 0 600 ]200 1800 2400 3000 3600 4200 4800 5400 6000 6600 7200 7800 ,, Section Departure ~ri]] {c}96 03~PtO 3.0b.06 21:30 A~4 PI ...... ' 'SHARE"D SERVTCES 'DRILLING ...... Anadri l] Schlumberger iii ii iii i i iii iiiii i ii ii iii ii i --~ ' 'I ..................... ITVD-~ca]~ii i-iriSh: 500 feet . Oep Scale.: ! inch 500 feet -- ~ ANAD~ i Li~ p,, D~ (A.L)i.,C Drawn A -D ........... . ' ~arker Zdent~ficat~on ~B BKB SECfN ZNOL SEP 1 7 199~ ,) END ~5/~00 CURVE ~0252 99~8 ~936 64.E ~'~ ~ DJ END8/'O0 CURVE 10557 9986 2231 89.2 ]NIT, AL~_...~ ~'~',- J~ E) TARGET (fl ~~ 10557 9986 223~ 89.2 F) START t2/100 DROP ~2743 lOO16 44S6 89.2 ......... 6) TARGET (2) ~~ i2743 ~00~6 4416 89.2 H) END J2/iO0 DROP ~2945 JO061 46i~ 65.C - ro~ ~¢'¢o~ I) TD / 7" LINER POINT ~382J ~0431 5405 65.( ...... ............. ,,, , .... , ...... 'T~- ~ ~ ¢ ....... [~ . ' ~ ' , . t~h~S~~- '~- r ' ~ ~ ' j .... G =-~ ......... 1 ......... 'T~¢ ¢ ¢ l -~lOTe .......... ~ ..... F - - -P - ' -~ ...... ::::: ::::::=::::~ : ::_: .... .__ ~::::: =:~:::~:~ EST~6 ~ 'T~ ¢ ~)' Tole) ' .. ,J 4-34/0-38 (PLO) (HA We]l) VERTICAL SECTION VIEW Section at: 130.62 lO00 1250 1500 (Anadri']] (c)~5 o3ep~o 3.0b.o6 ll;'31 AM P') 1750 2000 2250 2500 2750 3000 3250 3500 3750 4000 4250 4500 4750 5000 5250 5500 Section Departure im i I I I i i I I II i iiii I SHARED 'S RVICES DRTELTN'6 ' ii IUll II I I I II II II II II IIIIIIII II IIIIIIIII III I flll I I I I I III I I I III II I I I III II Jl ~nadri ll Schlumberger 4-34/0-38 [PLO) (HA Well) ,VERTICAL SECTION VIEW Section at: 80.62 ........ i.,.vo sc le:i i inch : ~00 feet · JDep Scale.: ~ inch lO0 feet ............ , ......... [-,,, rbmr-~,, ,Drawn ..... : 17Sep ,9 I . A ~ADRI[ L AK,k-DPC ...... A D DDf~/~ , Marker Identification MD BKB SECTN INCI  ~ ~ ~'~' ';~' '~ A] START ~5/100 CURVE 9930 9681 ~732 ~6.~ 1996 ,)ENO ~5/~00 CURVE ~0252 99~8 ~93~ 64.f 1 ~N[~t~~ ~~ E) TAR6ET (~) ********~ ~0557 9986 223~ 89.2 F) START ~2/~00 DROP ~2743 J0016 44J6 89.; ............... 6) TAR6ET (2) *******~* 12743 JO0i6 44~6 89.~ HI END ~2/100 DROP ~2945 ~006~ 4611 65.(  I) TD / 7" LINER POINT 1382J $043~ 5405 65.( ................ ....... ........................... m ~mmmmm lmmmmm' mmmmmmmmmm lmmmmmlmmmm mmJmm mmm. .,, D ,. ~ ~ ~ '. ~ ..... , ................ .. 'T~ ~ ~ ~ -~0~6' L .......... J .. . ...... 82 82 2! 2! 2! 2! 00 00 et ) 1600 1650 1700 1750 1800 1850 ~900 1950 2000 2050 2100 2J50 2200 2250 2300 2350 2400 2450 2500 Section Beparture Ill! I I I I I I I I I II I I III J I III I iAnadrlj] [C) 96 038P10 3.0D.06 it:31 AM P) 4-34/0-38 (PLO) (HA Well) PLAN VZE~ CLOSURE ..... : 5405 feet at Azimuth 80.36 DECLINATION.: +28.883 SCALE ....... : 1.inch = 800 feet DRAWN ....... : 17 Sep 19 SER DR ILL I Marker Identification MD N/S E/W A) KB 0 0 N 0 E B) NUDGE BUILD 1/~00 300 0 N 0 E C) END ~/~00 BUILD 600 8 N 1W D] NUDGE DROP 1/~00 2~10 86 N ~5 W E) END 1/100 DROP 2410 93 N 16 ~ F) KOP CURVE 2.5/100 3500 93 N 16 N G) END 2.5/100 CURVE 4160 105 N 77 E H) 9-5/8" CSG PT 4648 J22 N 2J5 E I) START 15/100 CURVE 9930 310 N 1704 E J) END 15/~00 CURVE 10252 341N ~906 E K) START 8/100 CURVE 10252 341N 1906 E L) END 8/100 CURVE 10557 388 N 2197 E M) TARGET (1) **~****** 10557 388 N 2197 E N) START 12/100 DROP 12743 744 N 4353 E O) TARGET (2) ~******, 12743 744 N 4353 E P) END 12/100 DROP 12945 776 N 4546 E 0) TD / 7" LINER POINT 13821 906 N 5329 E ANADRILL AKA-DPC APPROVED SE P 1 ? ~99G 'NItIALCS~ '~--¢ .---._, , , TARGET Il) (Radius 150 f G H ~~----"~ "~'~~- ., 400 0 400 800 I pnn 4 nnn ~nnn ~,~nn omnn 3200 3600 4000 4400 4800 5200 5600 6000 6400 6800 <- WEST' EAST-> (Anadrill (C) 96 038P10 3.0b.06 11:33 AM P) ~0 OII ALASKA OIL AND GAS CONSERVATION COMMISSION September 13, 1996 TONY KNOWLE$, GOVERNOR 3001 PORCUPINE DRIVE ANCHORAGE, ALASKA 99501-3192 PHONE: (907) 279-1433 FAX: (907) 276-7542 Steve Shultz, Sr Drlg Engr BP Exploration (Alaska), Inc. P O Box 196612 Anchorage, AK 99519-6612 Re: Well # Company Permit # Surf Loc Btmhole Loc Duck Island 4-34/0-38 BP Exploration (Alaska), Inc. 96-155 2601q'qSL, 667'WEL, Sec 08, T11N, R17E, UM 3344~SL, 1592'WEL, Sec 09, T11N, R17E, UM Dear Mr Shultz: Enclosed is the approved application for permit to drill the above referenced well. The permit to drill does not exempt you from obtaining additional permits required by law from other governmental agencies, and does not authorize conducting drilling operations until all other required permitting determinations are made. Blowout prevention equipment (BOPE) must be tested in accordance with 20 AAC 25.035. Sufficient notice (approximately 24 hours) of the BOPE test performed before drilling below the surface casing shoe must be given so that a representative of the Commission may witness the test. Notice may be given by contacting the Commission petroleum field inspector on the North Slope pager at 659-3607. David Chairman BY ORDER OF THE COMMISSION dlf/encl c: Dept ofFish & Game, Habitat Section - w/o encl Dept of Environmental Conservation - w/o encl [-~-.6 [ -i3 C~ -]~XlSCT [-~0~ [ 38 ] 10400/9907 ] ltm' Surface Hole Production Hole MWD Directional MWD Directional Only, to 10,000 feet MWD Directional, GR, Res, Den, Neutron Porosity I Cased Hole Logs:, I Gyro as required for close approach Mud Program: ISpecial design considerations I Refer to change over procudure to displace mud to Drill in I fluid. Surface Mud Properties: ] SPUD Density Marsh Yield 10 sec 10 min pH Fluid (PPG) Viscosity Point gel gel Loss 8.5 300 40-60 30-60 60-80 8.5-9.5 none- 10 to to to to to to to 9.5 100 20-40 15-20 20-30 8.5-9.5 none- 10 Intermediate Mud Properties: Subject to Pilot Hole Properties. The mud weight in the change based on pilot hole drilling results, intermediate hole may vary based on the pilot hole results. Density Marsh Yield 10 sec 10 min pH Fluid (PPG) Viscosity Point gel gel Loss 9.2-10.5 50-6- 20-30 12-15 25-30 9.5-10.0 <6 Lubtex as required. Production l~Iud Properties: Subject to I Drill in Fluid change based onPilot hole drilling results I Density Marsh Yield 10 sec 10 min LSRV Fluid (PPG) Viscosity Point gel gel cps Loss 9.3 NA 40-45 18-23 24-29 + 50,000 +6 Clorided mg/liter +_ 10,000 K:N ratio >1 Well Control: Well control equipment consisting of 5000 psi W.P. pipe rams, blind rams, and annular preventer will be installed and is capable of handling maximum potential surface pressures. Diverter, BOPE and drilling fluid system schematics on file with AOGCC. Directional'. ]KOP: 1900 I I Maximum Hole Angle: I 18° in surface and 88.9° in Horizontal Close Approach Weft: [ 4-38 / K-34 is 77 feet at 4517 TVD The above listed wells will be secured during the close approach. Deep well intersections NONE. Disposal: Annular Injection: All cuttings will be hauled off location. There will not be any annular injection for this well 4-34/0-38 Proposed Summary of Operations 1. Drill and set 20" conductor. 2. Prep location for rig move. 3. MIRU Doyon 15. Complete pre spud checklist and accept rig. . Nu and function test divertor system. Ensure the divertor is as per AOGCC specifications and is approved by the AOGCC supervisor. 5. Build spud mud volume. o Drill 13.5" surface hole as per directional plan and with short trips as required. Use gyro for close approach as per JORPS. Expexted TD of surface hole is 4641 ' MD. . o Run and cement 10.75" 45.5 ppf casing. Cement using screw -in cement collar, reciprocate casing while pumping cement as long as possible. Pump lead cement until we have cement to surface and the switch to tail slurry. ND divertor and NU and test BOP. Run wear bushing. . RIH w/13.5 bit and Single Power Section PDM (motor). Test the 10.75" casing to 3000 psig and plot pressure vs volume for LOT baseline. Drill out float equipment and 10 feet of new formation, Perform a LOT to a maximum of 12.5 ppg as per Recommended Practices Manual. Record pressure vs. cumulatrive volume for LOT test for well file. Ensure the mud is suited for ERD wells with lubrication, monitored for Torque and drag. Follow Pad Data Sheet short trip guidelines. 10. Drill 9.875" hole to final build up point at the top of the HRZ at + 9,939' MD (9636 ' TVD) with conventional Directional Drilling tools and LSND mud using real time MWD to confirm the top of the Kekiktuk at _+ 10493 feet. 11. Change over to 2% Sheardrill - N system. 12. Drill 9.875" hole final build up to target entry point at + 10493' MD (9976 ' TVD) with Meduim Radius Directional Drilling tools using real time MWD GR/Resitivity correlation to soft land at 88.93° in the Flow 5. 13. Drill 9.875" hole to TD at 12,626' MD (10016' TVD) using resistivity and porosity tools to stay in the desired section of the Flow sands. 14. Pull Wear Bushing. Run and Cement 7.625" casing to 12,626. Make sure there is a circulating head for the topdrive before starting to run 7.625" casing. Closely monitor casing running loads for drag. 15. Cement to 1000 feet above the top of the Kekiktuk. 16. WOC 12 hours and make clean out run to PBTD. 17. Perforate with DPCP gun with intervals to be picked from LWD logs. 18. PU and RIH with 4.5" chrome completion with packer, 6 GLM and SSSV to set tail pipe at _+ 10,400. 19. 20. 21. ND BOP and NU completion tree. Feeze protect, set BPV, close valves. Test tree. Hand over well to production. Cement Calculator Cement and Centralizer Calculations Well 4-34 / 0-38 Surface (1 Stage) Cement Job cement Type E G Hole Size 13.5 Yeild (cfs) 2.17 1.15 Casing Size 10.75 Weight (ppg) 1 2 15.8 BPF 0.0648 BPF + 30% 0.0842 BPF + 200% 0.1943 STAGE 1 Depth BBLS w/XSF Cu. Ft. Sacks !Top of Cement Shoe Depth ~ Calculated G Tail Volume 51 5 49.3 277 241 401 3 E Lead Volume 401 3 780,0 4379 201 8 0 STAGE 1 Total E 201 8 Total G 2 41 9-5/8" Turbulator I 0!from 4528 to 41 28 , Production 1-Stage Cement Job Cement Yield :Hole Size 9.875 Premium G 1.15 Casing Size 7.625 BPF 0.0383 BPF + 30% 0.0497 Top of Cemenl Stage 1 MD BBLS Cu. Ft. Sacks Calculated KekiktukKekiktuk TopTarget ~!~ 134 752 654 9896 TD ~~ Total G ST1 6 5 4 7" St Blades 121 From 12529 to 10396 One in 10.75" shoe 1 Total ST Blades 1 22 Page 1 Hazards: _ · Pressure:~normally hicjh pressures of up to 5000 psi may be encountered in the 3C due to gas injection approximately 1600' downdip of the target location at well 3-47/Q-35. Pressure in the 3B is uncertain, and range from 2900 to 4500 psi. Estimated sandface pressure based on average 1995 wellhead injection pressure is shown in Section III (right). · Gas: The top of the Kekiktuk is not prognosied to be close to the original GOC. No secondary gas cap is expected. · Mud: Equivalent mud wt. in the pilot hole across 3B of 10.5 lb/gal, possible. · Faults: Possible fault in HAW to the SE of N-37. Geologic Notes Kick Tolerance: 64 bbls 12.5 LOT (ref 4-34/O-38) and 10.2 MW. Close approach · 4-38 / K-34 well will be shut-in while drilling to 4917. H2S: There has been H2S at both MPI and SDI. Lost Circulation: No recent loses have occurred on the MPI. Stuck Pipe: Practice Good Stuck Pipe Prevention Procedure. RT. ELEV : BF. ELEV : i I HORIZONTAL COMPLETION TREE.: /2", 5000 psi / WELLHEAD: 13 518"1 5000 psi/ STANDARD WELLHEAO SSSV LANDING NIPPLE I 1600'I {3,813' MIN. ID) W/SSSV MIN I.D. of 2" SV Marine Shale Surface casing shoe set 100' MD above the base of the SV5 shale. Set the tubing string so that the WLEG is approximately 350' MD above the Top of the Kekiktuk (facilitates CTU squeezing & logs). A two nipple 100' tailpipe assembly is recommended. The packer setting depth (450' MD above the Top of the Kekiktuk) should be below the top of the cement (500' MD above the top of the Kekiktuk). Top of Cement 500' MD above Kekiktuk *Hazard warning: From the Top of the Kekilduk to the top of the 3A there is the possibility of gas & vadable reservoir pressure( 5.5 - 10.1 ppg emw). Projected Tops & Contacts WD isolation packer to be set below FV horizontal section to allow for isolation of lower FIV and Fill intervals. 4-1/2", 12.6#/ft, NSCT 13CR80tbg 10-3/4' Surf Csg GAS LIFT MANDRELS NO. MD-BKB TVD-SS #6 3500' #5 5250' #4 6500' #3 7200' #2 '-. 7900' #1 8600' 4-1/2" 'X' NIPPLE (3.813' ID) __ ~ ProductionPacker 4-1/2' Cr13 Tailpipe 4-1/2" 'X' NIPPLE (3.813" ID) 4-1,2' 'X' NIPPLE (3.813' Id) WLEG ~ DPC 6 SPF  ~ ~ "WDr Isolation Packer ~ 4-1/2" 'X' NIPPLE (3.725" ID) ~ DPC 6 SPF I -I I PBTD (top of float collar & cement) should be at least 100' below the OWC @ 10200' TVDSS. ~, ~. 7-5/8" Prod Csg DATE REV. BY COMMENTS ENDICOTT WELL 4-34/O-38 APl NO: 50-029- PROPOSED DRILLING DIAGRAM BP EXPLORATION, INC. Anadrill SchlUmberger Alaska District 1111 East 80th Avenue Anchorage, AK 99518 (907) 349-4511 Fax 344-2160 DIRECTIONAL WELL PLAN for SHARED SERviCEs'DRILLING Well ......... : 4-34/0-38 (P6) (HA Well) Field ........ : Endicott, SDI Computation..: Minimum CurvatUre Units ........ : FEET Surface Lat..: 70.32189899 N Surface Long.: 147.86197665 W LOCATIONS - ALASKA Zone: 3 Legal Description X-Coord Y,Coord Surface ...... : 2601 FSL 66'7 FEL S08 T11N R17E UM 270370.53 5970816.26 TARGET (BSL).: 3125 FSL 3714 FEL S09 TllN R17E UM 272617.00 5971272.00 BHL.(ESL) .... : 3344 FSL 1592 FEL .S09 T11N R17E UM 274744.00 5971427.00 PROPOSED WELL PROFILE STATION I~AS JI~ICI.~ DIRECTION VERT-DEPTHS SECT COORDINATES-FROM IDENTIFICATION DEPTH ANGLE KB 0 "0.00 NUDGE BUILD 1/100 300: 0.00 4'00 1.00 500 2.00 END 1/100 BUILD 600 3.00 AZIMUTH 0. O0 350.00 350.00 350.00 350. O0 TVD SUB-S DIST 0 -56 30O 244 400 .344 500 444 600 544 Prepared ..... : 09/04/96 Vert sectaz.:'84;08 KB elevation.: 56.00 ft' Magnetic Dcln: +2.8.883 (E)' Scale Factor.:. 0.99995990 Convergencet_:: -1.75330608 ANADRILL AKA-DPC 0 0.00 N 0 0.00 N '0 0.86 N -0 3.44 N -1 APPROVED FOR, PERMITTING . ONLY PLAN STATE- PLANE ' , TOOL DL/ X 'Y FAc~ 100. .. 0.00 E 270370.53 5970816.26 0.'00 0.00 E 270370.53 5970816.26 0.00 0.15 W 270370.40 5970817.12 HS 1.00 0.61 W 270370.03 5970819.71 HS 1.00 7.73 N 1.36 W 270369.40 5970824.03 .. 1'00 EST BASE PERMAFROST DROP 1/100 1457 3.00 1950 3.00 2000 2.50 2100 1.50 2200 0.50 350.00 1456 1400 350.00 1948 1892 350.00 1998 1942 350.00 2098 2042 350.00 2198 2142 -4 51.92 N -6 77.31 N -6 79.68 N -6 83,11 N -6 84.83 N 9.15 W 270362.97 5970868.43 0.00 13.63 W 270359.27 5970893.95 LS 0.00 14.05 W 270358.93 5970896.32 LS 1.00 14.65 W 270358.43 5970899.78 LS 1.00 14.96 W 270358.18 5970901.51 LS 1.00 END 1/100,DROP 2250 TOP UPPER SV SHALE 3308 0.00 0.00 350.00 2248 2192 350.00 3306 3250 -6 85.05 N -6 85.05 N, 15.00 W 270358.14 5970901.72 15.00 W 270358.14 5970901.72 1.00 0.00 (Anadrlll (c)96 038P6 3.0b.03 9:22 AM P) 4-34/0-38 (P6) (HA Well) 09/04/96 Page PROPOSED WELL PROFILE STATION IDENTIFICATION KOP CURVE 2.5/100 MEAS DEPTH ANGLE INCLN DIRECTION VERT-DEPTHS SECT AzIMITI"A TVD SUB-S DIST 3500 0.00 350.00 3600 2.50 78.25 3700 5.00 78.25 3800 7.50 78.25 3900 10.00 78.25 COORDINATES-FROM STATE-PLANE TOOL D~/ WELLHEAD X' Y FACE 100 3498 3442 -6 85.05 N 15.00 W 270358.14 5970901.72 0.00 3598 3542 -4 85.49 N 12.86 W 270360.29 5970902.10 HS 2.50 3698 3642 3 86.82 N 6.46 W 270366.73 5970903.24 ~S 2.50 3797 3741 13 89.04 N 4.20 E 270377.45 5970905.13 HS 2.50 3896 3840 28 92.14 N 19.09 ~ 270392.43 5970907.77 HS 2.50 ~ND 2.5/loo'cuRv~, TOP SV5 SHALE/SAND 4000 12.50 78.25 3994 3938 48 4100 15.00 78.25 4091 4035 72 4200 17.50 78.25 4187 4131 99 4232 18.31 78.25 4218 4162 109 4273 18.31 78.25 4256 4200 122 96.11 N 100.95 N 106.65 N 108.67 N 111.25 N 38.19 E 270411.64 5970911.15 HS 2.50 61.46 E 270435.05 5970915.28 HS 2.'50 88.85 E 270462.60 5970920.14 HS 2.50 98.56 E 270472.36 5970921.86 2.50 110.96 E 270484.83 5970924.06 0.00 BASE SV5 SHALE/SAND TOP TUFFS TOP HRZ CURVE 15/'100 4641 18.31 78.25 4606 4550 237 9381 18.31 78.25 9106 9050 1718 9939 18.31 78.25 9636 9580 1893 10021 18.31 78.25 9714 9658 1918 10100 30.10 80.77 9785 9729 1950 134.83 N 224.32 E 270598.86 5970944.16 438.05 N 1681.87 R 272064.95 5971202.63 473.76 N 1853.54 E 272237.62 5971233.07 478.99 N 1878.67 E 272262.90 5971237.52 484.71 N 1910.46 E '272294.84 5971242.27 0.00 0.00 0.00 6R 0.00 4R 15.00 10200 EST OGOC 10272 EST CGOC 10282 BHRZ/TOP ITKILYARIAK 10286 10300 45.08 82.18 9864 9808 2011 55.81 82.80 9910 9854 2066 57.44 82.88 9916 9860 2075 58.00 82.90 9918 9862 2078 60.07 83.00 9925 9869 2090 493.59 N 1970.63 E 272355.26 5971249.31 500.77 N 2025.27 E 272410.10 5971254.82 501.91 N 2034.31 E 272419.16 5971255.68 502.30 N 2037.45 E 272422.32 5971255.97 503.75 N 2049.16 E 272434.06 5971257.06 3R 15.00 2R 15.00 2R 15.00 2R 15.00 2R 15.00 10400 END 15/100 CURVE 10493 TARGET (BSL) ******* 10493 TOP KEKIKTUK/FLOW 5 10493 EST COWC 11559 75.06 83.60 9963 9907 2182 88.93 84.08 9976 9920 2274 88.93 84.08 9976 9920 2274 88.93 84.08 9976 9920 2274 88.93 84.08 9996 9940 3340 514.48 N , 2140.70 E 272525.88 5971264.98 524.'28 N 2231.57 E 272617.00 5971272.00 524.28 N 2231.57 E 272617.00 5971272100 524.28 N 2231.57 E 272617.00 5971272.00 634.29 N 3292.24 E 273680.50 5971349.50 2R 15.00 15.00 15.00 15.00 0.00 TD (ESL) *********** 12626 TOP FLOW UNIT 4 TOP FLOW UNIT 3 88.93 84.08 10016 9960 4406 10066 10010 10131 10075 (Anadrill (¢)96 038P6 3.0b.03 9:22 AM P) 744.30 N 4352.92 E 274744.00 5971427.00 , ANADRILL AKA-DPC APPROVED FOR PERMITTING .ONLY . PLAN # 'sb 0.00 4-34/0-38 (P6) (HA Well) 09/04/96 Page · PROPOSED WELL PROFILE STATION MEAS .INCLN DIRECTION VERT-DEPTHS SECT COORDINATES-FROM IDENTIFICATION DEPTH ANGLE . EST TOP TAR TOP FLOW UNIT 2 EST OOWC TOP FLOW UNIT I STATE-PLANE TOOL DL/ AZIMUTH TVD SUB-S DIST WELLHEAD X Y FACE 100 10156 10100 10197 10141 10251 10195 10306 10250 ANADRILL AKA-DPC .APPROVED: FOR PERMITTING ONLY PLAN ,.~ ~.L~. 'C .~_' _ ,L (Anadrill (c) 96 038P6 3.0b.03 9:22 AM P) -96 10:21 Anad~ill DPC 90~-,344 2160 P.O5 " SHARED SERVICES DRILLING' o ~ 4-54/U-5~ tPbJ ~IdA well) .-- VERTICAL SECTION VIEW )o-- c ............... Section at: 84.08 TVD Scale.' ~ inch : ~200 feet )o Der Scale.' 1 inch : 1200 feet Drawn .... ' 09/04/96 o -- Anadrj]] Schlumberger ~0 Marker Identification ~ BKB SECTN INCLN A) KB 0 0 0 O. O0 ' B) ~DGE BUILD ~/t00 300 300 0 0.00 C) END t/t00 BUILD 600 600 -~ 3.00 lO-- D) DROP 1/~00 lC50 t948 -6 3.00 E) END $/100 DROP 2250 2248 -6 0.00 ................. fl~¢ ~'~ F) KOP CURVE 2,5/t00 3500 3498 -6 0.00 ~0=_ F -', .... G) END 2.5/~00 CURVE 4232 4218 t09 t8.3t H) CURVE 15/~00 ~0021 9714 19~8 18.3~  I) END ~5/~00 C~VE ~0493 9976 2274 88.93 J) TARGET (B~) mamm~ma 10493 9976 2274 88.93 0-- K) TO (ESL) ***~***~,~ i2626 $0056 4406 88.93 0 A~JADRIL A~ k-DPC AFv OVi,.D n :nO t200 t800 2400 3000 3600 4200 4800 5400 6000 ~600 7200 7800 Sec t ion De SHARED SERVICES DRILLING ,4nadrJ ]1 Sch]umbenger Marker IMentification MO BKB SECTN INCLN ~, ~,,v~ ,~/,oo ,oo~, ,,,, ,,,~ ,~.~, 4-34/0-38 (P6) (HA We l 1) ~ ~,~ ,,su.,,-,, ,o,,~ ,,,~ ~,~ ,,.~ VERTICAL SECTION VIEW D) TO (EA) NW~)NMNM ~626 10016440688.93 ............ Section at 84 08 : " I i - , ~c mumm ac. 'I , ! i J'TVD Scale.: I inch = 300 feet , i i i JOepSca]e,: 1 ~nch:300 feet ~-- -~ ' . 10Pawn.....:, 09/04/96, , , .......... ~-¢~s' ~ -.- .-.. ...... ANA~Ri[[ . AKA, D'.6 - ';~' Al' PRO V E D ,. ;.~, .-::.': ~. , ~,, ~ ~ ~ , , ' ,.. . ~ ~'~..,~.~ . . _ ~ ....... -~ ~ ~,.,~,.: ,-,-~ ,,,.,,~_~77 ....... ........ ~ ~' 'C~ ~ ~ ........ ~ .......... I ........ } ......... ~ .... ~~,~g~,~,: ..... , - ..... ---::-____:: .......~ : :: : ..... .... i, ...... .......... _ ?:~ ~.J-,~.~- . , .............. 1800 1950 2]00 2L:~J0 2400 2550 2700 2850 3000 3150 3300 3450 3600 3750 3900 4050 4200 4350 4500 Section Departure i iiiii i (~nadri]l (c)96 038P6 3.~.03 9:~8 ~N P} ........ 4-34/0-38 (P6) (HA Well) PLAN VIEW ii il i CLOSURE · 4416 feet at Azimuth 80.30 NATION.' +28.885 !E) · I inch = 600 feet I · 0§/04/§6 ,, __. Ident i fication MD N/S E/W 0 ON 0E ...... GE BUILD l/t00 300 · 0 N 0 E 1/100 BUILD 600 B N I W ANAD RILL ~,KA-DFC P i/IO0 1950 77 N i4 W · , l/iO0 DR~ 2250 85 ~.~/,oo c~vE ,~ ,o., ~ ~ F 3R I'ERMITTI NG VE 15/100 10021 479 N 1879 E ~ m m v ~5/100 CURVE i0493 524 N 223~ E (ESL). *~,~,w~,~ 1~626 744 N 4~3 E .... ~"~ ~ ' I , = , ARGET . ~ '~ -.- ~ ...... ._ DECLINAT] SCALE DRAWN Harken IA) KB B) NUDGE C) END O} DROP lEI END F) KOP END ~I~ £N0 J} IAR~£T 300 0 300 <- WEST · EAST -> 600 900 1200 1500 i800 2100 2400 2700 3000 3300 3600 3900 4200 4500 4800 5100 (ln~rill (c)96 038P6 3.0b.03 9:.27 ill p) 96 10:23 Anadrill DPC . 907~44 2160 P.08 Anadrill Alaska District - Directional Well Planning Department NORMAL PLANE TRAVELLING CYLINDER RESULTS INCLUDING ELLIPSES OF UNCERTAINTY Client .............. : BP EXPLORATION Well Name ....... : 4-34/O-38(P06) Fiekt .......... ;..,.: ENDICOTT County / State..= BEECHEY pOINT, ALASKA APl# ................ : 50-029-96037-00 ' Anadrill ID# ...... : 500299603700P0603 Planned Well Survey Program Start End Type Interval 0 12626 MEWD 93 . Date Calculated ..... : 09/03196 17:23 Date Plotted .......... : 09/03/96 17:40 KBE ..................... : 56,00 Grid X .................. : 270370.53 Grid Y .................. : 697081 6.26 Grid Zone ............. : ASP ZONE 03 i OFFSET WELL I' MIN. i FLOWING PLUGGED ENTER ENTER EXIT EXIT CLOSE FLOWING ELLIPSE SURVEY SAFETY SAFETY '.PLUG NO DRILL NO DRILL PLUG APPROACH SAFET~- SEP. SEP. MD TVD DIST. DIST, ZONE ZONE ZONE ZONE STATU$. $EP. MD MD MD MD 4-381K-34 -28,5 27.0 77.8 4548 4517 55.5 11.4 2076 4917 PLUG 4-421P-38 3.2 53.0 82.0 3979 3974 49;8 9.9 FLOW 4-32/K-38 1.0 7.7 12.0 450 450 6.7 1.1 FLOW 4-28/N-37 6.5 53.5 79,9 3700 3698 47.0 9,3 FLOW 4-25/O-34 10.6 56.6 82.2 3601 3599 46,0 9.0 FLOW 3-47/Q-35 23.4 77.4 107.5 4391 4369 53.9 ' 11;0 FLOW - 3-27/M-33 23.1 60.7 80.5 2753 2751 37.5 6.9 FLOW . 4-46/N-39 26.0 66.7 88;7 3078 .3075 40.8 7.7 FLOW .3-39/J-39 26,6 64.4 -84.4 2778 2776 37.8 6.9. FLOW 4-20/T-34 39.5 85.7 I 11.5 .3623 3621 i 46,2 9.1 FLOW 3-29/J-32 35.5 75.5 97.0 3002 3000 40.0 7.5 FLOW 4-40/P-43 12.3 23.5 30.8 751 750 I 1,3 1.9 FLOW 3-33/K-37 40.2 77.0 96.3 2678 2676 36.8 6.7 FLOW 3-45/M-39 45.6 84.1 104.5 2853 2850 38.5 7.1 FLOW 3-23/N-32 53.0 97.8 122.6 3478 - 3476 44.8 8.7 FLOW 4-20/M-35 53.2 95.3 I 18;2 3202 3200 42.0 8.0 FLOW 3-49/J-40A(HA) (1::'05187.6 120,5 151.1 4295 4277 52.9 10.7 FLOW 3-49/Jo40APB1 P05)67.6 120.5 151.1 4295 .4277 . 52.9 10;7 FLOW 3-49/J-40 68.2 121.2 151.7 4296 4278 53.0 10,7 FLOW . 3-05/0-29 51.0 89.0 109.2 2800 2797 - 38,0 7.0 FLOW 4~14/R-34 67.6 113.5 139.2 3598 3596 46.0 9.0 FLOW 3-15/K-33 76.6 122.1 147.4 3550 3548 45.5 8.9 FLOW 4-18/S-30 73.8 I 16.1 139.2 3227 3225 42.3 8.1 FLOW 3-09/L-28A 83.4 . 129.3 164.6 3594 3591 45.9 9.0 . FLOW 3-09/L-28 83.7 1 29,7' 164.8 3597 3595 46.0 9.0 FLOW 3-35/L-36 67,8 99.6 I 15.5 2178 2175 31.8 5.4 FLOW 3-21/L-'34 78,9 109.2 124.1 2031 2028 30.3 5.1 FLOW 3-411K~39 88.6 119.4 134.6 2080 . 2078 30.8 5.2. FLOW 4-OS/Q-32A(PO ~) 135:5 181.0 206.3 ' 3546 3544 45.5 8,9 FLOW 4-06/Q-32 136,6. 181,1 206.4 3547 3545 45,5 8,9 FLOW 4.-08/P-27 122.7 162,4 183,8 2976 2974 39,8 7.4 FLOW 3-11/M-30 126.1 163.9 184.6 2878 2876 38.8 7.2 FLOW 4-44/M-44 J 34.0 44.1 50.7 675 674 10.1 1.7 FLOW 4-02/Q-28 151.8 i 197.6 223.0 3570 3668 46.7 8.9 FLOW' . 3-17/J-30A 124.2 155.8 177.4 2164 2162 31.5 5.4 FLOW 3-37/L-35 I 18.4 147.1 166.7 1908 1905 28.6 4.8' FLOW 4-481K-43 67.8 71.7 78.3 926 925 13.9 2.3 FLOW 3-17/J-30 128.$ 161.1 176.8 2129 2127 31.3 5.3 FLOW DI-02 340.1 405.2 641.3 6025 5919 65,1 15.1 FLOW 3-03/J-33 217.0 248~3 '270.6. 2128 2126 31.3 5.3 FLOW 3-07/N-28 167.8 190.8 202.0 ,1534 1532 23.0 3.8 FLOW 3-25/M-27 134.6 151.8 159;8 1134 1133 17.0 2.8 FLOW 3-O1/N-29 185.5; 208.4 219.6 1533 1531 23.0 3.8 FLOW 4-50/K-41 67.6 ! 75.5 79.2 526 ~ 526 7.9 1.3 FLOW 1-59/O-24(D01 ): 144.5 159.5 170.7 1001 1000 15~0 2.5 FLOW 4-10/M-28 i 133.6 145,3. 152.8 775 775 I 1.6 1.9 FLOW 4-10/M-28(G01~ 135.4 146.7 152.O 750 760 I 1.3 1.9 FLOW DI-01 t 733.0 799.1 968.2 6222 6107 66.1 15.6 FLOW 3-43/P-36 164.2 175.5 179.7 759 758 11.4 1,9 FLOW · 3-19/R-28 183.2 194.9 199.4 784 784 I 1,8 2.0 FLOW 4-04/'r-26 166.7 176.1 180.5 626 626 9.4 1.6 FLOW ANAr"~RILL A~C~-DPC APPRO¥'ED FOR PERMI i'TIN 3 ON PLAN NOTES: All ¢kq=~th~ & dlata~r,e~ ~'e in FEET All depths ere ref~er~ed from we& 4-3410-38(P0~) Mln Flowing S~fety Sap. ie ~o, nt of iddltior~l ~leat~e f~om flowir~ aifety llne, I 1 11 East 80th Avenue · Anchorage, Alaska 99518 ' Telephone: (907) 349-451 I · FAX: (907) 344-2160 96 10:24 Anadrill DPC 907~44 2160 P.09 L'~;I;1,,,',,,,"~. mj : ' : AlaSka District Directional Wall Planning Department NORMAL PLANE TRAVELLING CYLINDER RESULTS .INCLUDING ELLIPSES OF. UNCERTAINTY ~ient .............. : BP EXPLORATION ~iannecl Well Survey Program Date Calculated ..... : 09/03/96 17:23 Well Name ....... ': 4.34/O,38(1=06) - Start End. Type · Interval Date Plotted .......... :..09/03196 17:38 ' O. 12626 MEWD 93 Field ................: ENDICOTT KBE...' .................. : 56.00 County / State..: BEECHEY pOINT; ALASKA Grid X .................. : 270370,63 APl# ............... ;: 50-029-96037-00 ' GHd ¥ .................. -: 5970816,26 Anedrill lO# ...... '. 500299603700PO603 Grid Zone ............. : ASP ZONE 03 1500 10500 1 1 1 4-28/N-37 4-421P-38 TD 12625.63 -60 -30 0 30 60 90 120 150 180' 210 240 NORMAL PLANE SEPARATION (1" = 60 ft) 270 300 1111 East 80th Avenue · Anchorage, Alaska 99518 · Telephone: (907) 349-4511 e FAX: (907) 344-2160 NW Sec8 T11N R17E Umiat X=265834.320 Y=5973635.570 SW Sec 8 T11N R17E Umiat X=265688.100 Y=5968357.700 5279.79 91 °46'07" N Sec 8&9 T11N R17E Umiat X=271111.600 Y=5973472.630 5279.77 91o43'42" NE Sec 9 T11N R17E Umiat X=276388.970 Y=5973313.400 4-34/O-38 "KB" SURFACE LOCATION X=270370.530 Y=5970816.260 667.23 91o35'13'' I 4-34/0-38 TARGET {BSL) X=272617.000 Y=5971272.000 3714.00 91':'35'12" I O I I 4-34/O-38 TD (ESL) X=274744.000 Y=5971427.000 1592.10 91o35'12'' 5279.80 271o46'06'' S Sec 8&9 T11N R17E Umiat X=270965.390 Y=5968194.780 5279.78 271o43,40,, SE Sec 9 T11N R17E Umiat X=276242.770 Y=5968035.580 ~ERMIT CHECKLIST COMPANY ,/~P,,~ 2.~__~).//~:)C? INIT CLASS ~,~"/ ' v/_(..~ ~ ~// GEOL AREA ~.~-~ ~ m 2. Lease number appropriate ................... ~ ~ ::~-'~/, ~ 3. Unique well name and number ................ [ Y N '"" 4. Well located in a defined pool ................. Y N 5. Well located proper distance from drlg unit boundary ...... Y N 6. Well located proper distance from otherwells .......... Y N 7. Sufficient acreage available in drilling unit. ........... N 8. If deviated, is wellbore plat included N 10. Operator has appropriate bond in force ............. Y N 11. Permit can be issued without conservation order ....... Y N 12. Permit can be issued without administrative approval... Y N ~' 13. Can permit be approved before 15-day wail ....... i N exp [] dev~ reddl [] serv [] wellbore seg [] ann. disposal para req [] UNIT# ~ //'/'~.~,_<;"~:3 ON/OFFSHORE 4::~/L) REMARKS 14. Conductor string provided .................. ~..N 15. Surface casing protects ail known USDWs ......... 16. CMl' vol adequate to circulate on conductor & surf csg . . .~)N_ 17. CMT vol adequate to tie-in long sffing to surf csg ....... ~_,.~(~ 18. CM'r' will cover all known produc~e horizons ......... 19. Casing designs adequate for C, T, B & permafrost. ..... ~.N.. 20. Adequate tankage or reserve pit. ............... (,~ N . 21. If a re-drill, has a 10-403 for abndnmnt been approved .... ~--N-~L/~ 22. Adequate wellbore separation proposed ............ ~.~N 23. If diverter required, is it adequate ................ 24. Ddlling fluid program schematic & equip list adequate .... 25. BOPEs adequate ................ . ....... ~1 N 26. BOPE press rating adequate; test to _~ ~ psig.~ 27. Choke manifold complies w/AP! RP-53 (May 84) ...... '~) 28. Work will occur without operation shutdown .......... 29. is presence of H2S gas probable .............. 30. Permit can be issued w/o hydrogen sulfide measures ..... Y N/" A /) 31. Data presented on potential overpressure zones ....... Y N~ /~ ,/)~7~/ ., 32. Seismic analysis of shallow gas zones ............. Y,,/~ ' - 33. Seabed condition survey (if off-shore) ............ ~ N 34. Contact name/phone for weeid~ progress reports ..... /. Y N ze~or~tory only] GEO~O~GY: ENGINEEPalNG: COMMISSION: JDH ~ JDN TABx.'. ? / i...' . Comments/Instructions: :t rev 4/96 , , , · WELL PERMIT CHECKLISTCOMPANY '~ ¢ ~ FIELD & POOL ~.~{~ ! 00 INIT CLASS [') ,e..~ /- 0 J' ! ADMINISTRATION /,~R DATE. ENGiNEERiNG 'GEOLOGY GEOLAREA ~O/0 1. Permit fee attached ....................... ~ N 2. Lease number appmpfiate ................... ..~AN 3. Unique well name and number ................. 4. Well located in a defined pool .................. C~) N 5. Well located proper distance from ddg unit boundary ..... (~ N 6. Well located proper dLstance from other wells ......... ~ N 7. Sufficient acreage available in ddlling unit. .......... .~ N 8. If deviated, Ls wellborn plat included .............. ~ N 9. Operator only affected party ................... C~ N 10. Operator has appropriate bond in force ............ .(~ N 11. Permit can be issued without conservation order ....... (~ N 12. Permit can be issued wi'~hout administrative approval ..... C~ N 13. Can permit be approved before 15-daywalt. ......... (~ N 14. Conductor string provided .................. 15. Surface casing protects all known USDWs ......... ~ _ ,~ ~ 16. CMT vol adequate to circulate on conductor & surf csg . . . C.~ N 17. CMl' vol adequate to lie-in long s~ng to surf csg ...... 18. CMT will cover all known productive horizons ......... 19. Casing designs adequate for C, T, B & permaJmst. ..... 20. Adequate tankage or reserve pit. ............... _("~N 21. If a re-drill, has a 10-403 for abndnmnt been approved .... .~C-N--~¢ 22. Adequate wellbore separation proposed ............ N 23. If diverter required, is it adequate ............... N 24. program schematic & equip list adequate ' N Drilling fluid .... 25. ROPEs adequate ............. ~ ..... N 26. ROPE press ral~ng adequate; test to ~ ~4,,' psig. W-"'~N 27. Choke manifold complies w/APl RP-53 (May 84) ....... ~-~ 28. Work will occur without operalion shutdown .......... ~,~,.~N 29. is presence of H2S gas probable .............. ,, PROGRAM: exp El devXreddl [] sew [] wellborn seg [] ann. disposal para req [] UNIT# I (~ c~)'-'~ ON/OFF SHORE ~ 30. Permit can be issued w/o hydrogen sulfide measures ..... Y N 31. Data presented on potential overpressure zo~ 32. Seismic anal~ ....... ,Y, DATE ntact name/phone for weeld¥ progre~, mpo~,. ...... Y N )(3 ~ ~ (~ lexp~oratory ono'J REMARKS GEOL,? RPC ~ ENGINEERING: BEW ~-~ ?/~-~ JDH,~t--,~. COMMISSION: JDN Comments/Instructions: ',- A.'~OR~ist rev 4/96 Well History File APPENDIX Information of detailed nature that is not particularly germane to the Well Permitting Process but is part of the history file. To improve the readability of the Well History file and to simplify finding information, information-of this nature is accumulated at the end of the file under APPENDIX. No special effort has been made to chronologically organize this category of information. SPE f-SUN DRILLING SERVICES ANCHORAGE ALASKA PAGE SHARED SERVICES DRILLING ENDICOT/4-34/O-38 500292270500 NORTH SLOPE BOROUGH COMPUTATION DATE: 10/29/96 DATE OF SURVEY: 102096 MWD SURVEY JOB NUMBER: AK-MM-60130 KELLY BUSHING ELEV. = 54.65 FT. OPERATOR: BP EXPLORATION TRUE SUB-SEA MEASD VERTICAL VERTICAL DEPTH DEPTH DEPTH COURS INCLN DG MN COURSE DLS TOTAL DIRECTION RECTANGULAR COORDINATE DEGREES DG/100 NORTH/SOUTH EAST/WEST S VERT. SECT. .00 .00 -54.65 159.00 158.99 104.34 260.00 259.96 205.31 343.06 342.96 288.31 433.89 433.67 379.02 0 0 N .00 E .00 0 54 N 52.00 W .57 1 42 N 19.70 W 1.04 2 42 N 10.10 W 1.28 3 0 N 12.70 W .36 .00N .00E .00 .77N .98W -.85 2.67N 2.11W -1.65 5.75N 2.87W -1.90 10.18N 3.77W -2.06 525.59 525.26 470.61 618.01 617.60 562.95 709.39 708.89 654.24 801.87 801.28 746.63 893.75 893.10 838.45 2 35 N 5.20 E 1.04 2 24 N 16.60 E .58 2 42 N 21.90 E .42 2 17 N 17.00 E .49 1 36 N 4.40 E .89 14.59N 4.11W -1.68 18.53N 3.37W -.30 22.36N 2.02W 1.65 26.16N .66W 3.61 29.20N .02W 4.73 985.65 984.95 930.30 1112.00 1111.13 1056.48 1207.63 1206.61 1151.96 1302.14 1301.02 1246.37 1397.06 1395.85 1341.20 2 17 N 17.00 W 1.09 3 30 N 24.94 W 1.00 2 49 N 28.33 W .74 2 35 N 4.49 W 1.21 2 15 N 7.95 W .38 32.24N .47W 4.80 38.17N 2.83W 3.43 42.88N 5.18W 1.88 47.06N 6.45W 1.31 51.05N 6.88W 1.53 1491.98 1490.69 1436.04 1586.31 1584.92 1530.27 1681.01 1679.51 1624.86 1776.02 1774.39 1719.74 1871.52 1869.70 1815.05 2 28 N 9.83 W .25 2 40 N 8.82 W .21 2 53 N 1.10 E .56 3 11 N .90 W .33 4 1 N 18.42 W 1.43 54.93N 7.49W 59.11N 8.17W 63.68N 8.46W 68.71N 8.46W 74.55N 9.56W 1.57 1.57 2.03 2.85 2.72 1966.80 1964.77 1910.12 2060.64 2058.48 2003.83 2155.86 2153.61 2098.96 2251.81 2249.46 2194.81 2347.28 2344.88 2290.23 3 27 N 34.51 W 1.25 2 28 N 36.02 W 1.05 2 36 N 38.67 W .19 2 34 N 34.52 W .20 1 7 N 20.80 W 1.58 80.08N 12.24W 84.04N 15.03W 87.39N 17.59W 90.88N 20.18W 93.53N 21.73W .98 -1.13 -3.11 -5.10 -6.20 2442.78 2440.37 2385.72 2537.73 2535.31 2480.66 2632.18 2629.76 2575.11 2727.20 2724.77 2670.12 2822.35 2819.91 2765.26 0 16 S 88.70 E 1.32 0 22 N 50.03 E .26 0 37 N 76.89 E .36 0 48 S 78.04 E .37 0 48 N 82.50 E .28 94.40N 21.83W 94.60N 21.36W 94.92N 20.61W 94.90N 19.45W 94.85N 18.15W -6.15 -5.65 -4.87 -3.73 -2 .44 2917.38 2914.93 2860.28 3012.51 3010.05 2955.40 3107.55 3105.09 3050.44 3204.03 3201.57 3146.92 3299.58 3297.12 3242.47 1 1 S 82.71 E .34 0 18 N 9.45 W 1.21 0 10 N 16.33 W .14 0 7 N 69.91 W .15 0 32 N 2.66 E .54 94.83N 16.65W -.97 94.97N 15.85W -.16 95.37N 15.94W -.18 95.55N 16.08W -.29 96.04N 16.16W -.29 "'" :' ° 0 $ 'B. 7 SP~ f-SUN DRILLING SERVICES ANCHORAGE ALASKA PAGE SHARED SERVICES DRILLING ENDICOT/4-34/O-38 500292270500 NORTH SLOPE BOROUGH COMPUTATION DATE: 10/29/96 DATE OF SURVEY: 102096 MWD SURVEY JOB NUMBER: AK-MM-60130 KELLY BUSHING ELEV. = 54.65 FT. OPERATOR: BP EXPLORATION TRUE SUB-SEA MEASD VERTICAL VERTICAL DEPTH DEPTH DEPTH COURS INCLN DG MN COURSE DLS TOTAL DIRECTION RECTANGULAR COORDINATES DEGREES DG/100 NORTH/SOUTH EAST/WEST VERT. SECT. 3394.35 3391.88 3337.23 0 43 3489.48 3486.99 3432.34 1 34 3582.26 3579.67 3525.02 3 27 3677.96 3675.19 3620.54 3 32 3774.12 3771.02 3716.37 5 43 N 40.38 W .52 96.94N 16.53W N 86.77 E 2.20 97.47N 15.60W N 86.06 E 2.03 97.73N 11.53W N 81.06 E .33 98.39N 5.73W N 85.04 E 2.28 99.27N 1.99E -.51 .49 4.55 10.39 18. 14 3869.39 3865.48 3810.83 9 5 3965.21 3959.73 3905.08 11 40 4060.16 4052.40 3997.75 13 25 4155.82 4144.92 4090.27 15 54 4251.95 4237.35 4182.70 15 57 N 86.45 E 3.54 100.15N 14.23E N 83.14 E 2.76 101.77N 31.41E N 85.08 E 1.91 103.87N 51.93E N 85.16 E 2.59 105.92N 76.06E N 84.98 E .07 108.19N 102.36E 30.36 47.58 68.17 92.31 118.62 4347.56 4329.03 4274.38 16 58 4442.82 4420.14 4365.49 16 59 4537.50 4510.79 4456.14 16 33 4622.00 4591.85 4537.20 16 15 4716.80 4682.92 4628.27 15 58 N 85.24 E 1.07 l10.50N 129.37E N 81.09 E 1.27 113.81N 156.98E N 82.05 E .54 117.82N 184.01E N 81.48 E .41 121.24N 207.63E N 83.82 E .74 124.61N 233.72E 145.65 173.43 200.75 224.61 250.90 4812.56 4775.07 4720.42 4908.20 4867.15 4812.50 5002.25 4957.35 4902.70 5095.56 5046.67 4992.02 5189.41 5136.41 5081.76 15 15 17 16 17 36 45 6 30 31 N 83.92 E .39 127.39N 259.63E N 87.71 E 1.08 129.27N 285.41E N 82.92 E 2.03 131.49N 311.90E N 83.38 E .66 134.71N 338.69E N 80.52 E 1.40 138.57N 365.87E 276.92 302.66 329.16 356.12 383.56 5285.73 5228.30 5173.65 17 21 5381.34 5319.70 5265.05 16 46 5477.55 5411.99 5357.34 16 1 5571.48 5502.07 5447.42 16 53 5659.28 5586.19 5531.54 16 24 N 78.44 E .67 143.84N 394.24E N 79.43 E .67 149.23N 421.77E N 80.58 E .85 153.95N 448.53E N 80.49 E .92 158.33N 474.78E N 81.27 E .60 162.32N 499.62E 412.41 440.46 467.62 494.24 519.39 5757.28 5680.21 5625.56 16 20 5856.23 5775.19 5720.54 16 13 5951.88 5867.11 5812.46 15 53 6044.29 5955.94 5901.29 16 5 6140.70 6048.41 5993.76 16 45 N 82.62 E .40 166.19N 526.97E N 82.88 E .13 169.69N 554.50E N 81.90 E .45 173.19N 580.73E N 85.07 E .97 176.08N 606.02E N 84.55 E .71 178.54N 633.17E 547.01 574 . 74 601.20 626.62 653.81 6237.23 6141.03 6086.38 15 58 6332.20 6232.18 6177.53 16 36 6425.93 6321.92 6267.27 16 57 6521.43 6413.44 6358.79 16 15 6617.47 6505.71 6451.06 15 55 N 83.61 E .85 181.34N 660.23E N 84.83 E .76 184.02N 686.74E N 79.65 E 1.64 187.68N 713.52E N 80.99 E .83 192.28N 740.42E N 81.85 E .43 196.25N 766.74E 680.96 707.55 734.57 761.86 788.48 SPt ~-SUN DRILLING SERVICES ANCHORAGE ALASKA PAGE SI-DARED SERVICES DRILLING ENDICOT/4-34/O-38 500292270500 NORTH SLOPE BOROUGH COMPUTATION DATE: 10/29/96 DATE OF SURVEY: 102096 MWD SURVEY JOB NUMBER: AK-MM-60130 KELLY BUSHING ELEV. = 54.65 OPERATOR: BP EXPLORATION FT. TRUE SUB-SEA MEASD VERTICAL VERTICAL DEPTH DEPTH DEPTH COURS INCLN DG MN COURSE DLS TOTAL DIRECTION RECTANGULAR COORDINATES DEGREES DG/100 NORTH/SOUTH EAST/WEST VERT. SECT. 6711.75 6596.05 6541.40 6808.09 6687.87 6633.22 6901.39 6776.72 6722.07 6995.22 6865.91 6811.26 7091.38 6957.19 6902.54 17 19 17 55 17 37 18 31 18 8 N 82.60 E 1.50 199.89N 793.46E N 83.16 E .65 203.51N 822.40E N 86.51 E 1.14 206.07N 850.74E N 84.73 E 1.13 208.31N 879.76E N 82.44 E .85 211.68N 909.83E 815.43 844.57 872.95 901.95 932.16 7186.69 7048.19 6993.54 16 23 7281.09 7138.92 7084.27 15 38 7374.42 7228.90 7174.25 15 8 7469.26 7320.40 7265.75 15 21 7563.51 7411.36 7356.71 15 2 N 83.52 E 1.88 215.15N 937.90E N 83.83 E .80 218.02N 963.79E N 83.34 E .54 220.79N 988.41E N 82.13 E .40 223.95N 1013.16E N 81.52 E .38 227.46N 1037.62E 960.43 986.43 1011.18 1036.11 1060.82 7659.97 7504.36 7449.71 7755.12 7596.04 7541.39 7847.90 7685.21 7630.56 7942.62 7775.97 7721.32 8038.32 7867.79 7813.14 15 43 15 18 16 43 16 31 16 12 N 82.28 E .75 231.06N 1062.96E N 82.53 E .45 234.43N 1088.19E N 83.74 E 1.57 237.48N 1113.61E N 84.61 E .34 240.23N 1140.58E N 84.40 E .35 242.81N 1167.42E 1086.40 1111.85 1137.43 1164.48 1191.38 8134.22 7959.84 7905.19 16 22 8228.34 8050.16 7995.51 16 19 8324.50 8142.52 8087.87 15 58 8419.83 8234.15 8179.50 16 3 8515.23 8325.64 8270.99 16 52 N 85.64 E .40 245.14N 1194.21E N 85.81 E .07 247.12N 1220.62E N 85.63 E .37 249.11N 1247.29E N 86.58 E .29 250.90N 1273.52E N 86.86 E .86 252.44N 1300.53E 1218.19 1244.58 1271.21 1297.39 1324.28 8610.91 8417.37 8362.71 16 8703.82 8506.54 8451.89 16 8798.89 8597.91 8543.26 15 8899.27 8694.59 8639.94 15 8994.89 8786.62 8731.97 15 9 25 38 33 56 N 85.97 E .80 254.14N 1327.68E N 86.21 E .29 255.92N 1353.68E N 85.09 E .87 257.90N 1379.86E N 83.56 E .42 260.57N 1406.73E N 79.23 E 1.29 264.46N 1432.37E 1351.35 1377.29 1403.45 1430.39 1456.32 9089.73 8877.89 8823.24 15 36 9184.28 8968.45 8913.80 17 45 9278.95 9058.79 9004.14 17 1 9375.24 9151.25 9096.60 15 22 9470.50 9243.22 9188.57 14 48 N 77.70 E .57 269.61N 1457.63E N 78.57 E 2.30 275.18N 1484.18E N 79.53 E .84 280.56N 1511.96E N 82.38 E 1.90 284.81N 1538.46E N 83.25 E .64 287.92N 1563.06E 1482.08 1509.19 1537.47 1564.31 1589.09 9565.78 9335.59 9280.94 13 35 9658.55 9425.54 9370.89 14 41 9752.85 9516.25 9461.60 16 57 9848.00 9607.22 9552.57 17 7 9883.26 9640.90 9586.25 17 22 N 85.03 E 1.35 290.32N 1586.30E S 88.95 E 1.99 291.05N 1608.92E N 89.75 E 2.42 290.89N 1634.63E N 87.84 E .62 291.47N 1662.51E N 85.13 E 2.39 292.12N 1672.94E 1612.40 1634.85 1660.19 1687.78 1698.18 SPt Y-SUN DRILLING SERVICES ANCHORAGE ALASKA PAGE SHARED SERVICES DRILLING ENDICOT/4-34/O-38 500292270500 NORTH SLOPE BOROUGH COMPUTATION DATE: 10/29/96 DATE OF SURVEY: 102096 MWD SURVEY JOB NUMBER: AK-MM-60130 KELLY BUSHING ELEV. = 54.65 OPERATOR: BP EXPLORATION FT. TRUE SUB-SEA MEASD VERTICAL VERTICAL DEPTH DEPTH DEPTH COURS INCLN DG MN COURSE DLS TOTAL DIRECTION RECTANGULAR COORDINATES DEGREES DG/100 NORTH/SOUTH EAST/WEST VERT. SECT. 9915.25 9671.35 9616.70 9943.19 9697.61 9642.96 9977.38 9728.73 9674.08 10005.20 9753.00 9698.35 10037.98 9780.17 9725.51 18 21 27 31 36 15 42 4 23 38 N 82.62 E 3.65 293.17N 1682.67E N 80.97 E 12.47 294.54N 1692.12E N 79.98 E 15.75 296.89N 1706.03E N 80.51 E 15.59 299.19N 1719.42E N 81.12 E 16.02 302.10N 1737.52E 1707.95 1717.50 1731.61 1745.19 1763.52 10068.19 9803.63 9748.98 41 10101.43 9827.74 9773.09 45 10132.22 9848.61 9793.96 49 10162.39 9867.78 9813.13 52 10195.95 9887.44 9832.79 56 23 35 3 1 12 N 80.44 E 15.79 305.16N 1756.28E N 79.55 E 12.77 309.14N 1778.81E N 80.06 E 11.34 313.14N 1801.08E N 79.99 E 9.85 317.18N 1824.02E N 77.59 E 13.74 322.47N 1850.68E 1782.54 1805.41 1828.04 1851.33 1878.50 10228.11 9904.08 9849.43 10263.10 9919.72 9865.07 10289.83 9930.33 9875.68 10318.57 9940.70 9886.05 10350.06 9950.84 9896.19 61 28 65 24 67 48 69 54 72 31 N 76.79 E 16.52 328.58N 1877.51E N 77.07 E 11.23 335.65N 1907.99E N 77.10 E 9.02 341.14N 1931.90E N 78.40 E 8.41 346.82N 1958.09E N 78.94 E 8.48 352.68N 1987.31E 1905.96 1937.18 1961.66 1988.43 2018.22 10382.85 9960.13 9905.47 74 10413.90 9967.70 9913.05 77 10446.41 9973.71 9919.06 81 10478.93 9977.14 9922.49 86 10508.80 9978.46 9923.81 88 34 10 30 25 30 N 77.57 E 7.43 359.08N 2018.09E N 77.42 E 8.42 365.60N 2047.49E N 77.66 E 13.31 372.49N 2078.68E N 80.06 E 16.81 378.73N 2110.40E N 78.94 E 7.91 384.17N 2139.73E 2049.63 2079.70 2111.59 2143.91 2173.73 10560.25 9979.66 9925.01 88 49 10588.28 9980.22 9925.57 88 52 10622.38 9980.90 9926.25 88 49 10653.64 9981.64 9926.99 88 28 10681.59 9982.39 9927.74 88 26 N 80.52 E 3.14 393.34N 2190.34E N 81.36 E 3.00 397.75N 2218.01E N 82.60 E 3.64 402.51N 2251.77E N 80.61 E 6.46 407.07N 2282.68E N 79.73 E 3.15 411.84N 2310.21E 2225.16 2253.18 2287.26 2318.51 2346.44 10716.21 9983.16 9928.51 89 0 10747.20 9983.41 9928.76 90 5 10777.15 9983.23 9928.58 90 34 10811.20 9982.93 9928.28 90 25 10842.39 9982.67 9928.02 90 33 N 80.30 E 2.31 417.84N 2344.30E N 80.95 E 4.12 422.89N 2374.87E N 82.50 E 5.41 427.20N 2404.51E N 81.73 E 2.30 431.87N 2438.23E N 81.10 E 2.06 436.52N 2469.07E 2381.05 2412.04 2441.98 2476.02 2507.20 10872.22 9982.25 9927.60 10905.74 9981.65 9927.00 10937.89 9981.16 9926,51 10966.93 9980.85 9926.20 11027.90 9980.48 9925.83 91 91 9O 9O 9O 2 2 41 31 10 N 83.43 E 7.98 440.54N 2498.62E N 82.66 E 2.30 444.60N 2531.89E N 82.80 E 1.17 448.66N 2563.77E N 83.07 E 1.10 452.24N 2592.59E N 82.25 E 1.46 460.02N 2653.06E 2537.01 2570.49 2602.62 2631.63 2692.56 .Y-SUN DRILLING SERVICES ANCHORAGE ALASKA PAGE SHARED SERVICES DRILLING ENDICOT/4-34/O-38 500292270500 NORTH SLOPE BOROUGH COMPUTATION DATE: 10/29/96 DATE OF SURVEY: 102096 MWD SURVEY JOB NUMBER: AK-MM-60130 KELLY BUSHING ELEV. = 54.65 FT. OPERATOR: BP EXPLORATION TRUE SUB-SEA MEASD VERTICAL VERTICAL DEPTH DEPTH DEPTH COURS INCLN DG MN COURSE DLS TOTAL DIRECTION RECTANGULAR COORDINATES DEGREES DG/100 NORTH/SOUTH EAST/WEST VERT. SECT. 11057.45 9980.38 9925.73 90 13 11151.86 9981.70 9927.05 88 10 11244.65 9985.03 9930.38 87 41 11339.84 9988.88 9934.23 87 39 11436.47 9992.66 9938.01 87 51 N 83.20 E 3.22 463.77N 2682.37E N 83.52 E 2.19 474.68N 2776.12E N 81.47 E 2.27 486.79N 2868.04E N 82.56 E 1.14 500.00N 2962.23E N 82.66 E .23 512.42N 3057.98E 2722.09 2816.37 2909.03 3004.11 3100.61 11532.69 9995.31 9940.66 88 58 11626.47 9997.20 9942.55 88 43 11741.00 9999.42 9944.76 89 3 11835.00 10001.44 9946.79 88 28 11929.84 10004.02 9949.37 88 24 N 82.65 E 1.16 524.72N 3153.37E N 83.15 E .60 536.30N 3246.41E N 82.49 E .65 550.62N 3360.02E N 83.85 E 1.58 561.79N 3453.33E N 84.28 E .46 571.59N 3547.62E 3196.73 3290.41 3404.84 3498.71 3593.35 12025.93 10007.44 9952.79 87 30 12118.02 10010.97 9956.32 88 5 12212.98 10015.86 9961.21 86 0 12247.00 10018.98 9964.33 83 28 12277.58 10022.96 9968.31 81 34 N 84.58 E .99 580.92N 3643.19E N 84.09 E .83 590.00N 3734.76E N 84.75 E 2.32 599.22N 3829.13E N 84.99 E 7.47 602.25N 3862.86E N 85.59 E 6.51 604.74N 3893.08E 3689.16 3780.99 3875.60 3909.37 3939.58 12305.87 10027.31 9972.66 80 43 N 85.39 E 3.05 606.94N 3920.94E 12343.06 10033.65 9979.00 79 39 N 86.40' E 3.93 609.56N 3957.49E 12402.20 10045.98 9991.33 76 15 N 86.35 E 5.75 613.22N 4015.21E 12496.84 10071.10 10016.45 72 56 N 86.44 E 3.50 618.95N 4106.26E 12534.23 10082.48 10027.83 71 35 N 86.93 E 3.82 621.01N 4141.81E 3967.44 4003.92 4061.46 4152.23 4187.65 12566.72 10093.10 10038.45 70 16 N 85.62 E 5.59 623.01N 4172.45E 12594.17 10102.58 10047.93 69 19 N 85.59 E 3.46 624.98N 4198.13E 12631.26 10116.00 10061.35 68 14 N 85.79 E 2.96 627.58N 4232.61E 12662.46 10127.94 10073.29 66 46 N 87.00 E 5.92 629.39N 4261.38E 12690.19 10139.07 10084.42 65 53 N 84.28 E 9.53 631.32N 4286.70E 4218.20 4243.86 4278.30 4306.98 4332.27 12786.98 10181.19 10126.54 62 31 N 87.91 E 4.84 637.29N 4373.61E 12858.91 10215.97 10161.32 59 37 N 87.65 E 4.06 639.73N 4436.51E 12940.00 10256.98 10202.33 59 37 N 87.65 E .00 642.60N 4506.41E 4419.00 4481.45 4550.88 THE CALCULATION PROCEDURES ARE BASED ON THE USE OF THREE-DIMENSION MINIMUM CURVATURE METHOD. HORIZONTAL DISPLACEMENT = 4551.99 FEET AT NORTH 81 DEG. 53 MIN. EAST AT MD = 12940 VERTICAL SECTION RELATIVE TO WELL HEAD VERTICAL SECTION COMPUTED ALONG 80.62 DEG. GRASS ROOTS WELL TIE-IN AT SURFACE 0.00' MD PROJECTED SURVEY AT 12,940.00' MD SPE f-SUN DRILLING SERVICES ANCHORAGE ALASKA PAGE SHARED SERVICES DRILLING ENDICOT/4-34/O-38 500292270500 NORTH SLOPE BOROUGH COMPUTATION DATE: 10/29/96 DATE OF SURVEY: 102096 JOB NUMBER: AK-MM-60130 KELLY BUSHING ELEV. = 54.65 FT. OPERATOR: BP EXPLORATION INTERPOLATED VALUES FOR EVEN 1000 FEET OF MEASURED DEPTH TRUE SUB-SEA MEASD VERTICAL VERTICAL DEPTH DEPTH DEPTH TOTAL RECTANGULAR COORDINATES NORTH/SOUTH EAST/WEST MD-TVD DIFFERENCE VERTICAL CORRECTION .00 .00 -54.65 .00 N .00 E .0 1000.00 999.29 944.64 32.79 N .63 W .7 2000.00 1997.91 1943.26 81.72 N 13.37 W 2.0 3000.00 2997.54 2942.89 94.91 N 15.84 W 2.4 4000.00 3993.80 3939.15 102.61 N 38.40 E 6.2 .71 1.37 .37 3.75 5000.00 4955.20 4900.55 131.41 N 311.24 E 44.8 6000.00 5913.38 5858.73 175.02 N 593.79 E 86.6 7000.00 6870.44 6815.79 208.45 N 881.28 E 129.5 8000.00 7830.99 7776.34 241.77 N 1156.78 E 169.0 9000.00 8791.54 8736.89 264.73 N 1433.75 E 208.4 38.60 41.81 42.94 39.46 39.45 10000.00 9748.55 9693.90 298.74 N 1716.78 E 251.4 11000.00 9980.57 9925.92 456.26 N 2625.42 E 1019.4 12000.00 10006.32 9951.67 578.47 N 3617.40 E 1993.6 12940.00 10256.98 10202.33 642.60 N 4506.41 E 2683.0 42.99 767.98 974.25 689.33 THE CALCULATION PROCEDURES ARE BASED ON THE USE OF THREE-DIMENSION MINIMUM CURVATURE METHOD. SPt Y-SLrN DRILLING SERVICES ANCHORAGE ALASKA PAGE 7 SHARED SERVICES DRILLING ENDICOT/4-34/O-38 500292270500 NORTH SLOPE BOROUGH COMPUTATION DATE: 10/29/96 DATE OF SURVEY: 102096 JOB NUMBER: AK-MM-60130 KELLY BUSHING ELEV. = 54.65 OPERATOR: BP EXPLORATION FT. INTERPOLATED VALUES FOR EVEN 100 FEET OF SUB-SEA DEPTH TRUE SUB-SEA MEASD VERTICAL VERTICAL DEPTH DEPTH DEPTH TOTAL RECTANGULAR COORDINATES NORTH/SOUTH EAST/WEST MD-TVD VERTICAL DIFFERENCE CORRECTION .00 .00 -54.65 54.65 54.65 .00 154.66 154.65 100.00 254.69 254.65 200.00 354.77 354.65 300.00 .00 N .00 E .00 .00 N .00 E .00 .00 .73 N .93 W .01 .01 2.52 N 2.06 W .04 .03 6.30 N 2.97 W .12 .08 454.89 454.65 400.00 555.01 554.65 500.00 655.10 654.65 600.00 755.20 754.65 700.00 855.28 854.65 800.00 11.25 N 4.01 15.92 N 3.99 20.02 N 2.92 24.35 N 1.23 28.11 N .12 W .24 .13 W .36 .11 W .45 .09 W .55 .11 W .63 .08 955.33 954.65 900.00 1055.42 1054.65 1000.00 1155.60 1154.65 1100.00 1255.73 1254.65 1200.00 1355.83 1354.65 1300.00 31.08 N .11 W .68 .05 35.07 N 1.40 W .77 .09 40.58 N 3.95 W .95 .19 44.97 N 6.22 W 1.08 .12 49.43 N 6.66 W 1.18 .10 1455.91 1454.65 1400.00 1556.00 1554.65 1500.00 1656.12 1654.65 1600.00 1756.25 1754.65 1700.00 1856.44 1854.65 1800.00 53.39 N 7.22 57.71 N 7.96 62.42 N 8.49 67.61 N 8.44 73.54 N 9.23 W 1.26 .08 W 1.35 .10 W 1.47 .11 W 1.60 .14 W 1.79 .19 1956.66 1954.65 1900.00 2056.80 2054.65 2000.00 2156.90 2154.65 2100.00 2257.00 2254.65 2200.00 2357.06 2354.65 2300.00 79.57 N 11.89 83.91 N 14.93 87.43 N 17.62 91.07 N 20.31 93.71 N 21.80 W 2.01 .22 W 2.15 .14 W 2.25 .10 W 2.35 .10 W 2.41 .05 2457.06 2454.65 2400.00 2557.07 2554.65 2500.00 2657.07 2654.65 2600.00 2757.08 2754.65 2700.00 2857.09 2854.65 2800.00 94.40 N 21.76 94.68 N 21.26 94.98 N 20.35 94.81 N 19.05 94.91 N 17.67 W 2.42 .01 W 2.42 .00 W 2.42 .00 W 2.43 .01 W 2.44 .01 2957.11 2954.65 2900.00 3057.11 3054.65 3000.00 3157.11 3154.65 3100.00 3257.11 3254.65 3200.00 3357.11 3354.65 3300.00 94.74 N 15.95 95.21 N 15.89 95.51 N 15.98 95.66 N 16.18 96.58 N 16.23 W 2.46 .01 W 2.46 .00 W 2.46 .00 W 2.46 .00 W 2.46 .00 SP] Y-SUN DRILLING SERVICES ANCHORAGE ALASKA PAGE SHARED SERVICES DRILLING ENDICOT/4-34/O-38 500292270500 NORTH SLOPE BOROUGH COMPUTATION DATE: 10/29/96 DATE OF SURVEY: 102096 JOB NUMBER: AK-MM-60130 KELLY BUSHING ELEV. = 54.65 FT. OPERATOR: BP EXPLORATION INTERPOLATED VALUES FOR EVEN 100 FEET OF SUB-SEA DEPTH TRUE SUB-SEA MEASD VERTICAL VERTICAL DEPTH DEPTH DEPTH TOTAL RECTANGULAR COORDINATES NORTH/SOUTH EAST/WEST MD-TVD VERTICAL DIFFERENCE CORRECTION 3457.13 3454.65 3400.00 3557.19 3554.65 3500.00 3657.38 3654.65 3600.00 3757.67 3754.65 3700.00 3858.43 3854.65 3800.00 97.42 N 16.49 W 97.63 N 13.04 W 98.19 N 6.99 W 99.13 N .35 E 100.04 N 12.55 E 2.48 .01 2.54 .07 2.73 .19 3.02 .29 3.78 .76 3960.03 3954.65 3900.00 4062.48 4054.65 4000.00 4165.94 4154.65 4100.00 4269.94 4254.65 4200.00 4374.34 4354.65 4300.00 101.65 N 30.38 E 103.91 N 52.47 E 106.16 N 78.83 E 108.63 N 107.29 E 111.15 N 137.16 E 5.38 1.60 7.83 2.45 11.29 3.46 15.29 4.00 19.69 4.40 4478.91 4454.65 4400.00 4583.25 4554.65 4500.00 4687.39 4654.65 4600.00 4791.36 4754.65 4700.00 4895.22 4854.65 4800.00 115.44 N 167.39 E 119.63 N 196.90 E 123.74 N 225.67 E 126.79 N 253.96 E 129.13 N 281.88 E 24.26 4.56 28.60 4.35 32.74 4.14 36.71 3.97 40.57 3.86 4999.43 4954.65 4900.00 5103.88 5054.65 5000.00 5208.54 5154.65 5100.00 5313.33 5254.65 5200.00 5417.84 5354.65 5300.00 131.39 N 311.07 E 134.98 N 341.04 E 139.52 N 371.55 E 145.49 N 402.30 E 151.16 N 432.13 E 44.78 4.21 49.23 4.46 53.89 4.66 58.68 4.79 63.19 4.51 5521.94 5454.65 5400.00 5626.40 5554.65 5500.00 5730.64 5654.65 5600.00 5834.83 5754.65 5700.00 5938.93 5854.65 5800.00 155.96 N 460.64 E 160.91 N 490.44 E 165.22 N 519.54 E 168.95 N 548.56 E 172.69 N 577.22 E 67.29 4.10 71.75 4.46 75.99 4.24 80.18 4.19 84.28 4.09 6042.95 5954.65 5900.00 6147.21 6054.65 6000.00 6251.40 6154.65 6100.00 6355.65 6254.65 6200.00 6460.15 6354.65 6300.00 176.04 N 605.65 E 178.72 N 635.04 E 181.78 N 664.11 E 184.63 N 693.42 E 189.48 N 723.34 E 88.30 4.02 92.56 4.26 96.75 4.19 101.00 4.25 105.50 4.50 6564.36 6454.65 6400.00 6668.41 6554.65 6500.00 6773.18 6654.65 6600.00 6878.24 6754.65 6700.00 6983.34 6854.65 6800.00 194.15 N 752.28 E 198.23 N 780.73 E 202.23 N 811.73 E 205.65 N 843.75 E 207.96 N 876.00 E 109.71 113.76 118.53 123.59 128.69 4.21 4.05 4.77 5.06 5.10 .Y-SUN DRILLING SERVICES ANCHO~GE ALASKA PAGE SHARED SERVICES DRILLING ENDICOT/4-34/O-38 500292270500 NORTH SLOPE BOROUGH COMPUTATION DATE: 10/29/96 DATE OF SURVEY: 102096 JOB NUMBER: AK-MM-60130 KELLY BUSHING ELEV. = 54.65 OPER3kTOR: BP EXPLORATION FT. INTERPOLATED VALUES FOR EVEN 100 FEET OF SUB-SEA DEPTH TRUE SUB-SEA MEASD VERTICAL VERTICAL DEPTH DEPTH DEPTH TOTAL RECTANGULAR COORDINATES NORTH/SOUTH EAST/WEST MD-TVD VERTICAL DIFFERENCE CORRECTION 7088.71 6954.65 6900.00 211.57 N 909.00 E 134.06 5.37 7193.42 7054.65 7000.00 215.37 N 939.79 E 138.77 4.71 7297.42 7154.65 7100.00 218.50 N 968.16 E 142.77 4.00 7401.09 7254.65 7200.00 221.60 N 995.33 E 146.44 3.67 7504.77 7354.65 7300.00 225.24 N 1022.47 E 150.12 3.68 7608.35 7454.65 7400.00 229.17 N 1049.17 E 153.70 3.58 7712.20 7554.65 7500.00 232.95 N 1076.94 E 157.55 3.85 7815.99 7654.65 7600.00 236.47 N 1104.49 E 161.34 3.79 7920.39 7754.65 7700.00 239.63 N 1134.28 E 165.74 4.39 8024.64 7854.65 7800.00 242.44 N 1163.62 E 169.99 4.25 8128.81 7954.65 7900.00 245.03 N 1192.69 E 174.16 4.17 8233.02 8054.65 8000.00 247.21 N 1221.93 E 178.37 4.21 8337.11 8154.65 8100.00 249.38 N 1250.75 E 182.46 4.09 8441.16 8254.65 8200.00 251.25 N 1279.41 E 186.51 4.05 8545.55 8354.65 8300.00 252.93 N 1309.32 E 190.90 4.39 8649.73 8454.65 8400.00 254.90 N 1338.46 E 195.08 4.18 8753.95 8554.65 8500.00 256.88 N 1367.74 E 199.30 4.22 8857.81 8654.65 8600.00 259.33 N 1395.68 E 203.16 3.86 8961.64 8754.65 8700.00 262.76 N 1423.40 E 206.99 3.83 9065.60 8854.65 8800.00 268.23 N 1451.29 E 210.95 3.96 9169.79 8954.65 8900.00 274.30 N 1479.85 E 215.14 4.19 9274.62 9054.65 9000.00 280.33 N 1510.71 E 219.97 4.83 9378.77 9154.65 9100.00 284.94 N 1539.39 E 224.12 4.15 9482.32 9254.65 9200.00 288.27 N 1566.06 E 227.67 3.55 9585.39 9354.65 9300.00 290.72 N 1590.89 E 230.74 3.07 9688.64 9454.65 9400.00 290.91 N 1616.56 E 233.99 3.25 9792.99 9554.65 9500.00 290.94 N 1646.34 E 238.34 4.35 9897.67 9654.65 9600.00 292.49 N 1677.24 E 243.02 4.68 10007.21 9754.65 9700.00 299.37 N 1720.57 E 252.56 9.54 10141.56 9854.65 9800.00 314.37 N 1808.09 E 286.91 34.35 10362.98 9954.65 9900.00 355.09 N 1999.42 E 408.33 121.42 12437.13 10054.65 10000.00 615.36 N 4048.97 E 2382.48 1974.14 12727.32 10154.65 10100.00 634.25 N 4320.27 E 2572.67 190.19 12940.00 10256.98 10202.33 642.60 N 4506.41 E 2683.02 110.35 THE CALCULATION PROCEDURES USE A LINEAR INTERPOLATION BETWEEN THE NEAREST 20 FOOT MD (FROM MINIMUM CURVATURE) POINTS 4-34~0-38 ENDTCO i"1 RECEIVED ,JUL 2 2 1997 Oil & Gas cons. Comm~ Run 1' 25 - October- 1996 CNIGR (Cased Hole) 9365' 12734' WESTERN ATLAS Logg'i ng Ser'v:Lces Tape Subfile 2 is type: ,L~S TAPE HEADER ENDICOTT UNIT CASED HOLE WIRELINE LOGS WELL NAME: API NUMBER: OPEP~ATOR: LOGGING COMPANY: TAPE CREATION DATE: JOB NUMBER: LOGGING ENGINEER: OPERATOR WITNESS: SURFACE LOCATION SECTION: TOWNSHIP: RANGE: FNL: FSL: FEL: FWL: ELEVATION(FT FROM MSL 0) KELLY BUSHING: DERRICK FLOOR: GROUND LEVEL: WELL CASING RECORD 4-34/0-38 500292270500 BP EXPLORATION (ALASKA) INC. WESTERN ATLAS LOGGING SERVICES 09-JUL-97 6821.01 K. RICHARDS E. VAUGHN 8 liN 17E 2601 667 .00 54.65 14.10 OPEN HOLE CASING DRILLERS CASING BIT SIZE (IN) SIZE (IN) DEPTH (FT)WEIGHT (LB/FT) 1ST STRING 2ND STRING 3RD STRING 9.625 PRODUCTION STRING 7.000 CURVE SHIFT DATA - ALL PASSES TO STANDARD BASELINE CURVE FOR SHIFTS MWD GR 2 1 15-OCT-96 SPERRY- SUN PBU TOOL CODE: PBU CURVE CODE: RUN NUMBER: PASS NUMBER: DATE LOGGED: LOGGING COMPANY: BASELINE DEPTH GRCH 9367.5 9371.0 9381.0 9386.0 9388.0 9399.0 9408.5 9429.0 9433.5 9437.5 9441.5 9446.0 9456.0 9377.0 9380.5 9389.5 9395.0 9397.5 9409.0 9418.0 9438.5 9442.5 9446.5 9451.0 9455.0 9465.0 4669.0 47.00 12901.0 26.00 (MEASURED DEPTH) EQUIVALENT UNSHIFTED DEPTH 9475.5 9488.5 9495.0 9505.0 9511.5 9519.0 9523.5 9548.5 9556.5 9559.5 9565.5 9571.0 9577.0 9584.0 9601.5 9614.0 9626.5 9645.0 9660.0 9665.5 9675.5 9688.5 9710.0 9727.5 9741.5 9767.5 9772.0 9789.0 9790.5 9799.0 9814.5 9822.0 9825.5 9858.0 9866.5 9870.5 9879.5 9885.0 9894.0 9903.5 9909.0 9912.0 9918.5 9931.0 9946.0 9960.5 9964.5 9970.0 9977.0 9992.5 10007.0 10044.0 10050.5 10060.0 10077.5 10101.5 10127.0 10136.0 10138.0 10147.5 94~.0 9476.0 9483.0 9491.0 9499.0 9505.5 9510.0 9534.5 9542.0 9546.5 9551.5 9558.5 9564.0 9575.0 9588.5 9604.0 9617.5 9635.5 9650.5 9655.5 9666.0 9678.0 9703.5 9720.5 9735.5 9758.5 9763.5 9780.0 9781.5 9792.0 9805.0 9812.5 9816.0 9847.0 9854.5 9859.0 9868.0 9874.0 9884.5 9893.0 9897.5 9900.5 9907.0 9920.0 9934.5 9949.5 9953.0 9959.0 9965.5 9981.0 9995.5 10031.5 10038.5 10048.0 10065.5 10090.5 10115.0 10123.0 10125.5 10135.5 10163.0 10169°0 10201.0 10223.5 10237.5 10247.0 10258.0 10280.5 10316.5 10321.0 10326.5 10346.5 10402 .5 10407.0 10411.0 10413.0 10432.5 10441.0 10506.5 10518.0 10524.5 10565.0 10762.0 10772.0 10785.0 10789.5 10794.0 10798.5 10802.0 10836.5 10839.0 10847.0 10860.5 10865.5 10882.0 10906.0 10913.0 10919.5 10940.0 10945.0 10948.5 10949.0 10949.5 10999.5 11001.0 11003.5 11006.5 11010.0 11015.0 11016.0 11018.0 11023.5 11026.5 11031.5 11038.5 11039.0 11050.0 11056.5 11069.5 11080.0 lO!b~.5 10157.5 10192.5 10216.0 10230.5 10237.5 10248.0 10271.5 10306.5 10311.5 10319.5 10338.5 10395.5 10399.5 10403.0 10405.5 10424.0 10433.0 10499.0 10510.0 10516.0 10557.5 10753.5 10763.5 10776.5 10780.5 10785.5 10790.5 10794.0 10830.5 10835.0 10844.0 10854.5 10859.0 10876.5 10899.5 10907.5 10914.0 10933.5 10940.5 10944.0 10945.0 10945.5 10995.0 10996.5 10998.5 11001.5 11005.5 1101!.0 11011.5 11013.5 11019.0 11024.0 11029.0 11036.5 11038.0 11049.5 11055.0 11066.5 11075.5 11094.0 11105.0 11108.0 11124.0 11130.0 11134.5 11180.0 11180.5 11181.0 11187.5 11188.5 11189.0 11368.5 11369.0 11411.0 11411.5 11414.5 11415.0 11418.0 11459.5 11462.0 11484 . 5 11499.0 11506.0 11579.0 11693.0 11694.0 11694.5 11695.0 11735.5 11741.0 11750.5 11766.5 11771.0 11772.0 11835.0 11855.0 11871.5 11903.5 12030.5 12032.0 12032.5 12086.5 12122.0 12188.0 12191.5 12192.0 12195.0 12206.5 12213.0 12213.5 12217.0 12252.5 12258.0 12311.0 12321.5 12343.0 12351.0 12355.0 12357.0 1105~.0 11102.0 11107.0 11123.0 11129.5 11134.0 11179.0 11179.5 11180.5 11187.0 11187.5 11188.0 11370.0 11370.5 11411.5 11412.5 11415.5 11416.5 11419.5 11460.5 11463.0 11486.0 11500.5 11509.5 11582.0 11696.0 11697.5 11698.5 11699.0 11737.5 11741.5 11751.0 11766.0 11770.0 11770.5 11833.0 11853.0 11870.5 11903.0 12027.0 12028.5 12029.5 12085.5 12121.5 12185.5 12189.0 12190.0 12193.0 12203.5 12210.0 12211.0 12213.0 12247.5 12252.5 12308.0 12319.0 12338.5 12346.5 12351.0 12353.0 12360.5 12363 .5 12364.5 12365.0 12369.0 12387.0 12394 .0 12395.0 12395.5 12402 .5 12403.5 12404.5 12408.5 12409.0 12410.5 12418.5 12420.0 12434.5 12435.0 12436.5 12445.5 12462.0 12472.5 12474.0 12500.5 12511.0 12514.0 12515.0 12519.5 12553.0 12563 .5 12603.0 12603 .5 12604.5 12613 .5 12614.0 12620.5 12622.5 12623 .5 12624.0 12624.5 12627.5 12628.0 12629.0 12629.5 12631.5 12632.5 12633 .5 12639.0 12644.5 12652 . 0 12668.5 12670.5 12671.5 12672.0 12673.0 12704.0 12709.0 12709.5 12710.0 12359.0 12359.0 12359.5 12360.5 12364.5 12384.5 12390.0 12391.0 12391.5 12401.0 12402.0 12402.5 12406.5 12407.5 12409.0 12419.5 12421.0 12434.5 12435.0 12436.0 12445.0 12462.0 12473.5 12475.0 12500.5 12511.5 12513.5 12514.0 12518.5 12553.0 12563.5 12602.0 12602.5 12603.0 12612.0 12613.0 12619.5 12621.0 12622.0 12623.0 12623.5 12627.0 12627.5 12628.0 12629.0 12631.0 12631.5 12632.5 12638.0 12644.0 12650.5 12670.0 12672.0 12672.5 12673.0 12674.5 12703.0 12708.0 12709.0 12709.5 12711.0 12717.0 12726.0 12726.5 $ REMARKS: 127i~.0 12716.0 12724.5 12725.0 CN/GR Cased Hole. REFERENCE LOG WAS SPERRY-SUN MWD CN/SLD/GR LOG DATED 01-OCT-96. PIPE CONVEYED LOGGING OPERATION IN HORIZONTAL WELL. GAMMA RAY AND NEUTRON SPIKES OCCURED WHILE MAKING DRILL PIPE CONNECTIONS WHILE LOGGING. NO AFTER LOG VERIFICATIONS PERFORMED DUE TO SHORTED TOOL STRING OR PANEL. NEUTRON LOG PARAMETERS: SANDSTONE MATRIX, CHISM ON, CALIPER CORRECTION = 8.5", CASING CORRECTIONS: CASING THICKNESS = 0.361" CEMENT THICKNESS = 0.750", SALINITY = 0.0 PPM. SHIFT PROCEDURE AS FOLLOWS: 1) FIRST PASS GAMMA RAY DEPTH MATCHED TO OPEN HOLE GAMMA RAY. 2) FIRST PASS NEUTRON DEPTH MATCHED TO "SHIFTED" FIRST PASS GAMMA RAY. 3) ALL SUBSEQUENT GAMMA RAY PASSES DEPTH MATCHED TO "SHIFTED" FIRST PASS GAMMA RAY. 4) ALL SUBSEQUENT NEUTRON PASSES DEPTH MATCHED TO "SHIFTED" FIRST PASS NEUTRON. /? ?MATCH1A. OUT $ FILE HEADER FILE NUMBER: 1 EDITED CURVES Depth shifted and clipped curves PASS NUMBER: 1 DEPTH INCREMENT: .5000 FILE SUMMARY PBU TOOL CODE START DEPTH GRCH 9365.0 2435 9408.0 $ CURVE SHIFT DATA - BASELINE CURVE PASS TO PASS FOR SHIFTS PBU CURVE CODE GRCH PASS NUMBER: 1 BASELINE DEPTH NPHI 9377.0 9367.5 9380 . 5 9371 . 0 9389.5 9381.0 9395.0 9386.0 9397.5 9388.0 9409 . 0 9399 . 0 9418 . 0 9408 . 5 9438.5 9429.0 9442.5 9433.5 9446.5 9437.5 9451 . 0 9443 . 0 9455 . 0 9446 . 0 9465.0 9456.0 9470 . 0 9461 . 5 9475.5 9466.0 9488 . 5 9476 . 0 9495 . 0 9483 . 0 9505.0 9491.0 9511.5 9499.0 9519.0 9505.5 9523.5 9510.0 9548.5 9534.5 9556.5 9542.0 9559.5 9546.5 9565.5 9551.5 9571.0 9558.5 9577.0 9564.0 9584.0 9576.5 9601.5 9588.5 9614.0 9604.0 9626.5 9617.5 9645.0 9635.5 9660.0 9650.5 9665.5 9655.5 9675.5 9666.0 9688.5 9678.0 9710.0 9703.5 9727.5 9720.5 9741.5 9735.5 for each run in separate files. STOP DEPTH 12731.0 12734.0 (MEASURED DEPTH) EQUIVALENT UNSHIFTED DEPTH 9767.5 9772.0 9789.0 9790.5 9799.0 9814.5 9822.0 9825.5 9855.0 9858.0 9866.5 9870.5 9879.5 9885.0 9894.0 9903.5 9909.0 9912.0 9918.5 9931.0 9946.0 9960.5 9964.5 9970.0 9977.0 9992.5 10007.0 10044.0 10050.5 10060.0 10068.5 10077.0 10101.5 10127.0 10135.5 10138.5 10147.5 10162.5 10169.0 10201.0 10223.5 10237.5 10256.0 10263.5 10280.5 10285.5 10319.5 10327.0 10346.5 10398.0 10402.5 10407.0 10413.5 10432.5 10437.5 10477.0 10481 . 0 10506.5 10517.5 10524.5 975o .5 9763.5 9780.0 9781.5 9792.0 9805.0 9812.5 9816.0 9843.5 9847.0 9854.5 9859.0 9868.0 9874.0 9884.5 9893.0 9898.0 9900.5 9907.0 9920.0 9934.5 9949.5 9953.0 9959.0 9965.5 9981.0 9995.5 10031.5 10038.5 10048.0 10058.5 10066.5 10090.5 10115.0 10123.0 10125.0 10135.5 10152.5 10157.5 10192.5 10216.0 10230.5 10250.0 10257.5 10274.0 10280.0 10312.5 10320.5 10338.5 10392.5 10395.5 10399.5 10407.5 10424.0 10431.5 10472.0 10477.0 10499.0 10512.0 10516.0 10536.5 10556.0 10564.0 10578.5 10761.5 10772.0 10785.0 10789.5 10794.0 10798.5 10802.0 10836.5 10838.5 10847.0 10860.5 10865.5 10882.0 10906.5 10913.0 10919.5 10940.0 10945.0 10948.5 10949.0 10949.5 10976.0 11001.0 11006.0 11011.0 11015.0 11032.0 11038.5 11039.0 11044.0 11050.0 11057.0 11065.5 11071.5 11078.5 11088.0 11101.5 11120.0 11156.0 11173.0 11284.5 11298.0 11392.0 11411.0 11411.5 11414.5 11415.0 11418.0 11456.5 11476.5 11491.5 11499.0 11506.0 11510.0 11525.0 11552.0 105~.5 10551.5 10560.0 10571.0 10755.0 10763.5 10776.5 10780.5 10785.5 10790.5 10794.0 10830.5 10835.5 10844.0 10854.5 10859.0 10876.5 10902.0 10907.5 10914.0 10933.5 10940.5 10944.0 10945.0 10945.5 10971.5 10998.0 11003.5 11008.0 11013.5 11031.5 11036.5 11038.0 11042.5 11049.5 11056.0 11062.5 11069.5 11076.5 11088.0 11102.0 11120.0 11156.5 11173.5 11283.0 11297.5 11391.5 11411.5 11412.5 11415.5 11416.5 11419.5 11460.5 11479.5 11494.5 11500.5 11509.5 11513.5 11530.5 11555.0 11562.5 11569.5 11587.5 11693.0 11694.0 11694.5 11695.0 11735.5 11741.0 11750.5 11755.5 11762.5 11768.0 11773.0 11783.0 11810.0 11835.0 11854.0 11871.5 11903.5 12030.5 12032.0 12032.5 12087.0 12095.5 12100.5 12122.0 12174.0 12182.5 12187.0 12190.0 12195.0 12206.5 12213.0 12213.5 12217.0 12259.0 12261.5 12265.0 12270.0 12275.5 12314.5 12321.5 12343.0 12351.0 12355.0 12357.0 12361.5 12375.5 12391.0 12396.5 12403.0 12418.5 12420.0 12441.0 12460.0 12471.5 12489.5 12500.5 12505.5 11560.5 11572.5 11589.0 11696.0 11697.5 11698.5 11699.0 11737.5 11741.5 11751.0 11755.0 11762.0 11767.5 11771.0 11781.5 11808.5 11833.0 11852.5 11870.5 11903.0 12027.0 12028.5 12029.5 12086.5 12094.5 12099.0 12121.5 12173.0 12182.0 12185.5 12189.5 12193.0 12203.5 12210.0 12211.0 12213.0 12255.5 12258.5 12263.5 12271.5 12276.0 12311.0 12319.0 12338.5 12346.5 12351.0 12353.0 12360.5 12374.5 12391.0 12397.5 12404.0 12419.5 12421.0 12443.0 12461.0 12472.5 12490.0 12500.5 12506.0 12511.0 12518.0 12522.0 12540.5 12555.0 12560. 0 12570.0 12610.5 12620.5 12622.5 12623 .5 12624.0 12624.5 12627.5 12628.0 12629.0 12629.5 12631.5 12632.5 12633 .5 12639.0 12644 .5 12652.0 12668.5 12670.5 12671.5 12672.0 12673.0 12704 .0 12709.0 12715.0 12726.0 12726.5 $ REMARKS: 125~z. 5 12518.0 12523.0 12541.0 12556.0 12561.5 12572.0 12611.0 12619.5 12621.0 12622.0 12623.0 12623.5 12627.0 12627.5 12628.0 12629.0 12631.0 12631.5 12632.5 12638.0 12644.0 12650.5 12670.0 12672.0 12672.5 12673.0 12674.5 12703.0 12709.0 12715.0 12724.5 12725.0 PASS 1 (MAIN PASS). FUCT & NUCT WERE SHIFTED WITH NPHI. GRCH WAS DEPTH MATCHED TO OPEN HOLE GAMMA RAY. / ? ?MATCH1B . OUT $ CN : BP EXPLORATION WN : 4-34/0-38 FN : ENDICOTT COUN : NORTH SLOPE STAT : ALASKA * FORMAT RECORD (TYPE# 64) ONE DEPTH PER FRAME Tape depth ID: F 4 Curves: Name Tool Code Samples Units (ALASKA) Size API API API API Log Crv Crv Length Typ Typ Cls Mod 1 GRCH 2435 68 1 GAPI 4 2 NPHI 2435 68 1 PU-S 4 3 FUCT 2435 68 1 CPS 4 4 NUCT 2435 68 1 CPS 4 * DATA RECORD (TYPE# 0) 1006 BYTES * Total Data Records: 138 4 43 995 99 4 43 995 99 4 43 995 99 4 43 995 99 16 Tape File Start Depth = 12785.000000 Tape File End Depth = 9350.000000 Tape File Level Spacing = 0.500000 Tape File Depth Units = Feet **** FILE TRAILER **** LIS representation code decoding summary: Rep Code: 68 34356 datums Tape Subfile: 2 760 records... Minimum record length: Maximum record length: 62 bytes 1006 bytes Tape Subfile 3 is type: LIS FILE HEADER FILE NUMBER: 2 EDITED CURVES Depth shifted and clipped curves PASS NUMBER: 2 DEPTH INCREMENT: .5000 FILE SUMMARY PBU TOOL CODE START DEPTH GRCH 12485.0 2435 12532.0 $ CURVE SHIFT DATA - PASS TO PASS BASELINE CURVE FOR SHIFTS PBU CURVE CODE GRCH PASS NUMBER: 1 BASELINE DEPTH GRCH 12497.0 12496.0 12498.0 12497.0 12498.5 12498.0 12501.0 12500.5 12502.0 12501.0 12502.5 12501.5 12510.0 12508.0 12518.0 12516.0 12519.0 12516.5 12519.5 12517.5 12522.5 12520.5 12523.5 12521.0 12533.0 12531.5 12535.5 12534.0 12536.5 12534.5 12540.0 12538.0 12553.0 12552.0 12555.0 12558.5 12559.5 12561.0 12562.0 12561.0 12563.0 12561.5 12567.0 12567.0 12570.0 12583.0 12584.0 12589.0 12598.5 12604.0 12602.5 12604.5 12605.0 12603.0 12606.0 12604.0 12606.5 12605.0 12608.0 12606.5 12609.0 12607.0 12610.5 12613.5 12612.5 for each run in separate files. STOP DEPTH 12729.0 12732.0 (MEASURED DEPTH) EQUIVALENT UNSHIFTED DEPTH NPHI 12555.0 12558.5 12559.0 12560.5 12570.5 12589.0 12599.0 12604.5 12610.5 12615.5 12639.5 12642 . 0 12646.0 12647.0 12650.0 12665.5 12666.5 12671.5 12672.5 12682.0 12683.0 12685.0 12688.5 12691.5 12693.0 12694.0 12695.0 12696.0 12699.0 12708.5 12711.0 12711.5 716.0 716.5 720.0 721.0 722.0 725.0 727.0 731.0 12 12 12 12 12 12 12 12 $ REMARKS: 12638.5 12641.5 12645.5 12646.0 12649.0 12665.5 12671.5 12672.0 12687.0 12691.5 12692.0 12694.0 12707.0 12710.0 12711.0 12715.5 12721.0 12723.5 12615.0 12640.5 12665.5 12681.5 12682.0 12685.0 12690.0 12693.5 12696.5 12716.0 12719.5 12720.0 12724.5 12729.0 PASS 2 (REPEAT PASS). FUCT & NUCT WERE SHIFTED WITH NPHI. /? ?MATCH2A. OUT / ? ?MATCH2B. OUT $ CN : BP EXPLORATION WN : 4-34/0-38 FN : ENDICOTT COUN : NORTH SLOPE STAT : ALASKA * FORMAT RECORD (TYPE# 64) ONE DEPTH PER FRAME Tape depth ID: F 4 Curves: Name Tool Code Samples Units GRCH 2435 68 1 GAPI (ALASKA) Size API API API API Log Crv Crv Length Typ Typ Cls Mod 1 4 4 43 995 99 1 2 NPHI 2435 , 684 1 PU-S 4 3 FUCT 2435 68 1 CPS 4 4 NUCT 2435 68 1 CPS 4 * DATA RECORD (TYPE# 0) 1006 BYTES * Total Data Records: 14 4 43 995 99 4 43 995 99 4 43 995 99 16 Tape File Start Depth = 12785.000000 Tape File End Depth = 12450.000000 Tape File Level Spacing = 0.500000 Tape File Depth Units = Feet **** FILE TRAILER **** LIS representation code decoding summary: Rep Code: 68 3356 datums Tape Subfile: 3 116 records... Minimum record length: Maximum record length: 62 bytes 1006 bytes Tape Subfile 4 is type: LIS FILE HEADER FILE NUMBER: 3 AVERAGED CURVES Compensated Neutron: Arithmetic average of edited passes for all curves. Pulsed Neutron: Unaveraged edited Pass 1 gamma ray and background counts; arithmetic average of edited static baseline passes for all other curves. DEPTH INCREMENT: 0.5000 PASSES INCLUDED IN AVERAGE PBU TOOL CODE PASS NUMBERS GRCH 2435 $ REMARKS: CN WN FN COON STAT 1, 2 1, 2 AVERAGED PASS. GRCH, NPHI, FUCT, & NUCT WERE AVERAGED FOR BOTH PASSES. $ : BP EXPLORATION (ALASKA) : 4-34/0-38 : ENDICOTT : NORTH SLOPE : ALASKA * FORMAT RECORD (TYPE# 64) ONE DEPTH PER FRAME Tape depth ID: F 4 Curves: Name Tool Code Samples Units API API API API Log Crv Crv Size Length Typ Typ Cls Mod 1 GRCH CNAV 68 1 GAPI 4 2 NPHI CNAV 68 1 PU-S 4 3 FUCT CNAV 68 1 CPS 4 4 NUCT CNAV 68 1 CPS 4 4 38 995 99 1 4 38 995 99 1 4 38 995 99 1 4 38 995 99 1 16 * DATA RECORD (TYPE# 0) 1006 BYTES * Total Data Records: 138 Tape File Start Depth = 12785.000000 Tape File End Depth = 9350.000000 Tape File Level Spacing = 0.500000 Tape File Depth Units = Feet **** FILE TRAILER **** LIS representation code decoding summary: Rep Code: 68 68712 datums Tape Subfile: 4 161 records... Minimum record length: 62 bytes Maximum record length: 1006 bytes Tape Subfile 5 is type: LIS FILE HEADER FILE NUMBER: 4 RAW CURVES Curves and log header data for each pass in separate files; raw background pass in last file. PASS NUMBER: 1 DEPTH INCREMENT: .2500 FILE SUMMARY VENDOR TOOL CODE START DEPTH GR 9360.0 2435 9367.0 $ LOG HEADER DATA STOP DEPTH 12732.0 12740.0 DATE LOGGED: SOFTWARE VERSION: TIME LOGGER ON BOTTOM: TD DRILLER (FT) : TD LOGGER (FT) : TOP LOG INTERVAL (FT) : BOTTOM LOG INTERVAL (FT) : LOGGING SPEED (FPHR) : DEPTH CONTROL USED (YES/NO): TOOL STRING (TOP TO BOTTOM) VENDOR TOOL CODE TOOL TYPE SWIV CCL GR CN KNJT KNJT ACC SBT VDL CENT $ SWIVEL SUB CASING COLLAR LOC. GAMMA RAY COMPENSATED NEUTRON KNUCKLE JOINT KNUCKLE JOINT ACOUSTILOG COMMON SEGMENTED BOND TOOL VDL SUB CENTROLLER BOREHOLE AND CASING DATA OPEN HOLE BIT SIZE(IN): DRILLER'S CASING DEPTH (FT) : LOGGER'S CASING DEPTH (FT) : BOREHOLE CONDITIONS FLUID TYPE: FLUID DENSITY (LB/G): SURFACE TEMPERATURE (DEGF): BOTTOM HOLE TEMPERATURE (DEGF) : FLUID SALINITY (PPM) : FLUID LEVEL (FT) : FLUID RATE AT WELLHEAD (BPM) : WATER CUTS (PCT) : GAS/OIL R3ITIO: CHOKE (DEG) : NEUTRON TOOL 25-OCT-96 FSYS REV. J001 VER. 1.1 2129 25-OCT-96 12940.0 12782.0 9400.0 12740.0 1500.0 YES TOOL NUMBER 3944XA 2317XA 1309XA 2435XA 3921NA 3921NA 1633EA 1424XA 1424PA .000 12901.0 .0 LSND 10.10 .0 .0 700 .0 .000 .000 .000 .0 TOOL TYPE (EP-ITHER~L OR THERMAL) : MATRIX: MATRIX DENSITY: HOLE CORRECTION (IN): THERMAL SANDSTONE .00 8.500 BLUELINE COUNT RATE NORMALIZATION IN OIL ZONE TOP NORMALIZING WINDOW (FT) : BASE NORMALIZING WINDOW (FT) : .0 .0 BLUELINE COUNT RATE SCALES SET BY FIELD ENGINEER FAR COUNT RATE LOW SCALE (CPS): 20 FAR COUNT RATE HIGH SCALE (CPS): 820 NEAR COUNT RATE LOW SCALE (CPS) : 100 NEAR COUNT RATE HIGH SCALE (CPS) : 1100 TOOL STANDOFF (IN): .0 REMARKS: PASS 1 (MAIN PASS). $ CN WN FN COUN STAT : BP EXPLORATION (ALASKA) : 4-34/0-38 : ENDICOTT : NORTH SLOPE : ALASKA * FORMAT RECORD (TYPE# 64) ONE DEPTH PER FRAME Tape depth ID: F 8 Curves: Name Tool Code Samples Units API API API API Log Crv Crv Size Length Typ Typ Cls Mod 1 GR 2435 68 1 GAPI 4 2 CNC 2435 68 1 PU-S 4 3 CN 2435 68 1 PU-L 4 4 LSN 2435 68 1 CPS 4 5 SSN 2435 68 1 CPS 4 6 CCL 2435 68 1 DIM 4 7 SPD 2435 68 1 F/MN 4 8 TEN 2435 68 1 LB 4 4 43 310 01 1 4 43 995 99 1 4 43 890 01 1 4 43 334 31 1 4 43 334 30 1 4 43 150 01 1 4 43 636 99 1 4 43 635 99 1 32 * DATA RECORD (TYPE# 0) 1014 BYTES * Total Data Records: 491 Tape File Start Depth = 12782.000000 Tape File End Depth = 9350.000000 Tape File Level Spacing = 0.250000 Tape File Depth Units = Feet **** FILE TRAILER **** LIS representation code decoding summary: Rep Code: 68 126918 datums Tape Subfile: 5 572 records... Minimum record length: 62 bytes Maximum record length: 1014 bytes Tape Subfile 6 is type: LIS FILE HEADER FILE NUMBER: 5 RAW CURVES Curves and log header data for each pass in separate files; raw background pass in last file. PASS NUMBER: 2 DEPTH INCREMENT: 0.2500 FILE SUMMARY VENDOR TOOL CODE START DEPTH GR 12484.5 2435 12492.0 $ LOG HEADER DATA DATE LOGGED: SOFTWARE VERSION: TIME LOGGER ON BOTTOM: TD DRILLER (FT) : TD LOGGER (FT) : TOP LOG INTERVAL (FT) : BOTTOM LOG INTERVAL (FT) : LOGGING SPEED (FPHR) : DEPTH CONTROL USED (YES/NO): STOP DEPTH 12730.0 12738.0 25-OCT-96 FSYS REV. J001 VER. 1.1 2056 25-OCT-96 12940.0 12782.0 9400.0 12740.0 1500.0 YES TOOL STRING (TOP TO BOTTOM) VENDOR TOOL CODE TOOL TYPE SWIV CCL GR CN KNJT KNJT ACC SBT VDL CENT $ SWIVEL SUB CASING COLLAR LOC. GAMMA RAY COMPENSATED NEUTRON KNUCKLE JOINT KNUCKLE JOINT ACOUSTILOG COMMON SEGMENTED BOND TOOL VDL SUB CENTROLLER TOOL NUMBER 3944XA 2317XA 1309XA 2435XA 3921NA 3921NA 1633EA 1424XA 1424PA BOREHOLE AND CASING DATA OPEN HOLE BIT SIZE (IN): DRILLER'S CASING DEPTH (FT) : LOGGER'S CASING DEPTH (FT) : 0.000 12901.0 0.0 BOREHOLE CONDITIONS FLUID TYPE: FLUID DENSITY (LB/G): SURFACE TEMPERATURE (DEGF): BOTTOM HOLE TEMPERATURE (DEGF) : FLUID SALINITY (PPM) : FLUID LEVEL (FT) : FLUID RATE AT WELLHEAD (BPM) : WATER CUTS (PCT) : GAS/OIL RATIO: CHOKE (DEG) : LSND 10.10 0.0 0.0 700 0.0 0.000 0.000 0.000 0.0 NEUTRON TOOL TOOL TYPE (EPITHER~L OR THERMAL): MATRIX: MATRIX DENSITY: HOLE CORRECTION (IN): THERMAL SANDSTONE 0.00 8.500 BLUELINE COUNT RATE NORMALIZATION IN OIL ZONE TOP NORMALIZING WINDOW (FT) : 0.0 BASE NORMALIZING WINDOW (FT) : 0.0 BLUELINE COUNT RATE SCALES SET BY FIELD ENGINEER FAR COUNT RATE LOW SCALE (CPS): 20 FAR COUNT RATE HIGH SCALE (CPS): 820 NEAR COUNT RATE LOW SCALE (CPS) : 100 NEAR COUNT RATE HIGH SCALE (CPS) : 1100 TOOL STANDOFF (IN): 0.0 REMARKS: PASS 2 (REPEAT PASS). $ CN WN FN COUN STAT : BP EXPLORATION (ALASKA) : 4-34/0-38 : ENDICOTT : NORTH SLOPE : ALASKA * FORMAT RECORD (TYPE# 64) ONE DEPTH PER FRAME Tape depth ID: F 8 Curves: Name Tool Code Samples Units API API API API Log Crv Crv Size Length Typ Typ Cls Mod 1 GR 2435 68 1 GAPI 4 2 CNC 2435 68 1 PU-S 4 3 CN 2435 68 1 PU-L 4 4 LSN 2435 68 1 CPS 4 5 SSN 2435 68 1 CPS 4 6 CCL 2435 68 1 DIM 4 7 SPD 2435 68 1 F/MN 4 8 TEN 2435 68 1 LB 4 4 43 310 01 1 4 43 995 99 1 4 43 890 01 1 4 43 334 31 1 4 43 334 30 1 4 43 150 01 1 4 43 636 99 1 4 43 635 99 1 32 * DATA RECORD (TYPE# 0) 1014 BYTES * Total Data Records: 44 Tape File Start Depth = 12780.000000 Tape File End Depth = 12476.000000 Tape File Level Spacing = 0.250000 Tape File Depth Units = Feet **** FILE TRAILER **** LIS representation code decoding summary: Rep Code: 68 79666 datums Tape Subfile: 6 125 records... Minimum record length: 62 bytes Maximum record length: 1014 bytes Tape Subfile 7 is type: LIS 97/ 7/ 9 O1 **** REEL TRAILER **** 97/ 7/ 9 01 Tape Subfile: 7 2 records... Minimum record length: 132 bytes Maximum record length: 132 bytes End of execution: Wed 9 JLY 97 4:39p Elapsed execution time = 4.45 seconds. SYSTEM RETURN CODE = 0 Tape Subtile 2 is ..type: LIS TAPE HEADER ENDICOTI' UNIT MWD/MAD LOGS # WELL NAME: API NUMBER: OPERATOR: 4-34/0-38 500292270500 BP EXPLORATION (ALASKA) INC. LOCKING COMPANY: SPERRY-SUN DRILLING SERVICES TAPE CREATION DATE: 27-JAN-97 LOGGING ENGINEER: S. BURKI-L&RDT S. BURKHARDT OPERATOR WITNESS: E. VAUGHN E. VAUGHN E. VA~,.fG~N MWDRUN 6 MWDRUN 7 MWDRUN 8 JOB NUMBEPc IX)C~ING ENG--: S. BURK3IARDT S. BURKHARDT M. HANIK OPERATOR WITNESS: E. VAUGHN E. VAUGHN E. VAUGHN MWD RUN 9 MWD RUN 10 MWD RUN 11 JOB NUMBER: LOCkING ENGINEER: S. BURKHARDT M. HANIK M. HANIK OPERATOR WITNESS: J. CARLILE E. VAUGHN E. VAUGHN MWD RUN 12 MWD RUN 13 MWD RUN 14 JOB NUMBER: IX)CaGING ENGINEER: M. HANIK M. HANIK M. HANIK OPERATOR WITNESS: E. VAUGHN J. CARLILE J. CARLILE MWD RUN 15 JOB NUMBER: LOCK3ING ENGINEER: OPERATOR WITNESS: # SURFACE LOCATION SECTION: TOWNSHIP: tLiNGE: FNL: FSL: 2601 FEL: 667 FWL: ELEVATION(FT FROM MSL 0) KELLY BUSHING: DERRICK FLOOR: GROUND LEVEL: WELL CASING RECORD MWD RUN 16 M. WORDEN M. WORDEN J. CARLILE E. VAUGHN 54.65 14.10 8 liN 17E OPEN HOLE CASING DRILLERS BIT SIZE (IN) SIZE (IN) DEPTH (FT) jAN 2 Alaska ()il 1ST STRING 2ND STRING 3RD STRING 12.250 9.625 4669.0 PRODUCTION STRING 8.500 12940.0 REMARKS: MWD - GR/EWR4/SLD/CNP. ALL DEPTHS ARE MEASURED BIT DEFrI2qS. ANNULAR HYDRAULICS CALCULATED USING THE POWER LAW MODEL. MWD RUN 1 WAS DIRECTIONAL ONLY. NO DATA IS PRESENTED. MWD RUNS 2, 4, 5, 6, 7, 8, & 9 WERE DIRECTIONAL WITH GAMMA RAY. MWD RUNS 10 THROUGH 16 WERE GAMMA RAY, ELECTROMAGNETIC WAVE 4-PHASE RESISTIVITY (EWR4), COMPENSATED NEUTRON POROSITY (CNP), AND STABILIZED LITHO DENSITY (SLD). NUCLEAR DATA FROM 10170 TO 10555' IS FROM A MAD PASS MADE WHILE TRIPPING IN TIlE HOLE AT THE START OF MWD RUN 10. GAMMA RAY FROM 12416 - 12940 IS GAMMA CH. B ONLY. ENVIRONMENTAL P~TERS USED FOR NUCLEAR LOGS: HOLE SIZE: 8.5" MUD FILTRATE SALINITY: 8500 - 9500 ppm Cl WEIGHT: 10.4 - 10.6 ppg FORMATION WATER SALINITY: 16,000 ppm CI FLUID DENSITY: 1.0 g/cc MATRIX DENSITY: 2.65 g/cc LITHOLOGY: SANDSTONE. NO DEPTH SHIFTS WERE APPLIED PER TOM HOMZA OF BP EXPLORATION (ALASKA) INC (31-OCT-96). FILE HEADER FILE NUMBER: 1 EDITED MERGED MWD Depth shifted and clipped curt,es; all bit runs merged. DEPTH INCREMENT: .5000 FILE SUMMARY PBU TOOL CODE START DEPTH STOP DEFITI GR 4542.0 12906.0 RP 9841.0 12879.0 NPHI 10170.0 12886.0 RHOB 10171.0 12896.0 $ BASELINE CURVE FOR SHIFFS: CURVE SHIFF DATA (MEASURED DEPTH) ......... EQUIVALENT UNSHIFTED DEPTH ~-- BASELINE DEPTH $ MERGD DATA SOURCE PBU TOOL CODE BIT RUN NO MERGE TOP MERGE BASE MWD 2 4680.0 7335.0 MWD 4 7335.0 8210.0 MWD 5 8210.0 8870.0 MWD 6 8870.0 9547.0 MWD 7 9547.0 9876.0 MWD 8 9876.0 10200.0 MWD 9 10200.0 10555.0 MWD 10 10555.0 10989.0 MWD 11 10989.0 11059.0 MWD 12 11059.0 11724.0 MWD 13 11724.0 12183.0 MWD 14 12183.0 12284.0 MWD 15 12284.0 12416.0 MWD 16 12416.0 12940.0 $ # REMARKS: MERGED MAIN PASS. CN WN FN COUN STAT : BP EXPLORATION (ALASKA) : 4-34/O-38 : DUCK ISLAND/ENDICOTT : NORTH SLOPE * FORMAT RECORD (TYPE# 64) ONE DEPTH PER FRAME Tape depth ID: F 13 CunTes: API API API API Log Crv Crv Name Tool Code Samples Umts Size Length Typ Typ Cls Mod 1 GR MWD 68 1 AAPI 4 4 90310 01 1 2 RPX MWD 68 1 OHMM 4 4 90 995 99 1 3 RPS MWD 68 1 OHMM 4 4 90 640 99 1 4 RPM MWD 68 1 OHMM 4 4 90 995 99 1 5 RPD MWD 68 1 OHMM 4 4 90 995 99 1 6 NPHIMWD 68 1 PU-S 4 4 90 995 99 1 7 FCNTMWD 68 1 CPS 4 4 90 995 99 1 8 NCNTMWD 68 1 CPS 4 4 90 995 99 1 9 RHOBMWD 68 1 G/C3 4 4 90 995 99 1 10 DRHOMWD 68 1 G/C3 4 4 90 995 99 1 11 PEF MWD 68 1 BN/E 4 4 90 995 99 1 12 FET MWD 68 1 HR 4 4 90 995 99 1 13 ROP MWD 68 1 FPHR 4 4 90 995 99 1 52 * DATA RECORD (TYPE# 0) 1014BYTES * Total Data Records: 934 Tape File Start ~ = 12940.000000 Tape File End Depth = 4542.000000 Tape File Level Spacing = 0.500000 Tape File Depth Units = Feet **** FILE TRAILER **** LIS representation code decoding summary: Rep Code: 68 235159 datums Tape Subtile: 2 1067 records... Minimum record length: 62 bytes Maximum record length: 1014 bytes Tape Subtile 3 is t3.3:~:: LIS FILE HEADER FILE NUMBER: 2 RAW MWD Curves and log header data for each bit mn in separate files. BIT RUN NO: 2 DEPTH INCREMENT: .5000 FILE SUMMARY VENDOR TOOL CODE START DEPTH GR 4542.0 7293.0 $ LOG HEADER DATA DATE I.Z)C~ED: 27-SEP-96 SOFTWARE SURFACE SOFTWARE VERSION: DOWNHOLE SOFTWARE VERSION: DATA TYPE (MEMORY OR REAL-TIME): TD DRILLER (FT): 7335.0 TOP LOG INTERVAL (FT): 4680.0 BoTroM LOG INTERVAL (Fr): 7335.0 BIT ROTATING SPEED (RPM): 0 HOLE INCLINATION (DEG) MINIMUM ANGLE: 15.6 MAXIMUM ANGLE: 18.5 STOP DEPTH 4.88 5.46 MEMORY TOOL STRING (TOP TO BOTTOM) VENDOR TOOL CODE TOOL TYPE DGR DUAL GAMMA RAY $ TOOL NUMBER P0581CG6 BOREHOLE AND CASING DATA OPEN HOLE BIT SIZE ON): DRILLER'S CASING DEPTH (FT): 8.500 4669.0 BOREHOLE CONDITIONS MUD TYPE: LSND MUD DENSITY (LB/G): 9.70 MUD VISCOSITY (S): 43.0 MUD PH: 8.6 MUD CHLOR/DES (PPM): 800 FLUID LOSS (C3): 6.2 RESISTIVITY (OHMM) AT TEMPERATURE (DEGF) MUD AT MEASURED TEMPERATURE (MT): MUD AT MAX CIRCULATING TEMPERATURE: MUD FILTRATE AT MT: .000 .0 MUD CAKE AT MT: .000 .0 .0 119.0 NEUTRON TOOL MATRIX: MATRIX DENSITY: HOLE CORRECTION (IN): TOOL STAN-DO~ (IN): EWR FREQUENCY (HZ): REMARKS: MWD RUN 2. $ CN WN FN COLIN STAT : BP EXPLORATION (ALASKA) : 4-34/O-38 : DUCK ISLAND/ENDICOTt : NORTH SLOPE * FORMAT RECORD (TYPE# 64) ONE DEPTH PER FRAME Tape depth ID: F API AP1 API API Log Crv Crv Name Tool Code Samples Units Size Length Typ Typ Cls Mod GR MWD 68 1 AAPI 4 4 90 310 01 1 ROP MWD 68 1 FPHR 4 4 90 995 99 1 8 * DATA RECORD (TYPE# 0) 1014 BYTES * Total Data Records: 67 Tape File Start Depth - 7350.000000 Tape File End Depth -- 4542.000000 Tape File Level Spacing = 0.500000 Tape File Depth Units = Feet LIS representation code decoding summary: Rep Code: 68 16852 datums Tape Subtile: 3 130 records... Minimum record length: 62 bytes Maximum record length: 1014 bytes Tape Subtile 4 is type: LIS FILE HEADER FILE NUMBER: 3 RAW MWD Chh-yes and log header data for each bit nm in separate files. BIT RUN NO: 4 DEPTH INCREMENT: .5000 FILE SUMMARY VENDOR TOOL CODE START DEPTH GR 7294.0 8168.0 $ LOG HEADER DATA DATE LOGGED: 28-SEP-96 SOFTWARE SURFACE SOFTWARE VERSION: DOWNHOLE SOFFWARE VERSION: DATA TYPE (MEMORY OR REAL-TIME): TD DRILLER (FT): TOP LOG INTERVAL (PT): BOTTOM LOG INTERVAL (FT): BIT ROTATING SPEED (RPM): HOLE INCLINATION (DEG) MINIMUM ANGLE: MAXIMUM ANGLE- STOP DEPTH 4.88 5.46 MEMORY TOOL STRING (TOP TO BO'ITOM) VENDOR TOOL CODE TOOL TYPE DGR DUAL GAMMA RAY $ 8210.0 7335.0 8210.0 0 BOREHOLE AND CASING DATA OPEN HOLE BlT SIZE ON): DRILLER'S CASING DEPTH (FT): TOOL NUMBER P0581CG6 15.0 16.7 8.500 4669.0 BOREHOLE CONDITIONS MUD TYPE: LSND MUD DENSITY (LB/G): 9.70 MUD VISCOSITY (S): 45.0 MUD PH: 9.1 MUD CHLORIDES (PPM): 800 · FLUID LOSS (C3): 6.2 RESISTIVITY (OHMM) AT TEMPERATURE (DEGF) MUD AT MEASURED TEMPERATURE (MT): MUD AT MAX CIRCULATING TEMPERATURE: MUD FILTRATE AT MT: .000 .0 MUD CAKE AT MT: .000 .0 NELrrRON TOOL MATRIX: MATRIX DENSITY: .000 .0 .000 122.0 HOLE CORRECTION (IN): TOOL STANDOFF (IN): EWR FREQUENCY (HZ): REMARKS: MWD RUN 4. $ CN WN FN COUN STAT : BP EXPLORATION (ALASKA) : 4-34/O-38 : DUCK ISLAND/ENDICOTT : NORTH SLOPE * FORMAT RECORD (TYPE# 64) ONE D~ PER FRAME Tape depth ID: F API API API API Log Crv Crv Name Tool Code Samples Units Size Length Typ Typ Cls Mod 1 GR MWD 68 1 AAPI 4 4 90 310 01 1 2 ROP MWD 68 1 FPHR 4 4 90 995 99 1 * DATARECORD (TYPE# 0) 1014 BYTES * Total Data Records: 23 Tape File Start Depth = 8225.000000 Tape File End Depth = 7275.000000 Tape File Level Spacing = 0.500000 Tape File Depth Units = Feet **** FILE TRAILER **** LIS representation code decoding summary: Rep Code: 68 240863 datums Tape Subtile: 4 86 records... Minimum record length: 62 bytes Maximum record length: 1014 bytes Tape Subtile 5 is t3..3:~e: LIS FILE HEADER FILE NUMBEP< 4 RAW MWD Curves and log header data for each bit run in separate files. BIT RUN NO: 5 DEFI~ INCREMENT: .5000 # FILE SUMMARY VENDOR TOOL CODE START DEPTH GR 8154.0 8813.0 $ LOG HEADER DATA STOP DEPTH DATE LOGGED: 29-SEP-96 SOFTWARE SURFACE SOFTWARE VERSION: 4.88 DOWNHOLE SOFTWARE VERSION: 5.46 DATA TYPE (MEMORY OR REAL-TIME): MEMORY TD DRILLER (FT): 8870.0 TOP LOG INTERVAL (FT): 8210.0 BOSOM LOG INTERVAL (FT): 8870.0 BIT ROTATING SPEED (RPM): 0 HOLE INCLINATION (DEG) ~ ANGLE: 15.6 MAX~ILrM ANGLE: 16.9 TOOL STRRqG (TOP TO BoTro~ VENDOR TOOL CODE TOOL TYPE DGR DUAL GAMMA RAY $ TOOL NUMBER P0581CG6 BOREHOLE AND CASING DATA OPEN HOLE BIT SIZE GN): DRILLER'S CASING DEPTH (FT): 8.500 4669.0 BOREHOLE CONDITIONS MUD TYPE: LSND MUD DENSITY (LB/G): 9.70 MUD VISCOSITY (S): 46.0 MUD PH: 9.3 MUD CHLORIDES (PPM): 800 FLUID LOSS (C3): 4.8 RESISTIVITY (OHMM) AT TEMPERA~ (DEGF) MUD AT MEASURED TEMPERATURE (MT): MUD AT MAX CIRCULATING TEMPERATURE: MUD FILTRATE AT MT: .000 .0 MUD CAKE AT MT: .000 .0 .000 .000 .0 126.0 NEUTRON TOOL MATRIX: MATR2X DENSITY: HOLE CORRECTION (IN): .000 TOOL STANDO~ (IN): EWR FREQUENCY (HZ): REMARKS: MWD RUN 5. $ CN WN FN COUN STAT : BP EXPLORATION (ALASKA) : 4-34/O-38 : DUCK ISLAND/ENDICOTT : NORTH SLOPE * FORMAT RECORD (TYPE# 64) ONE DEPTH PER FRAME Tape depth ID: F API API API API Log Crv Crv Name Tool Code Samples Units Size Length Typ Typ Cls Mod 1 GR MWD 68 1 AAPI 4 4 90 310 01 1 2 ROP MWD 68 1 FPHR 4 4 90 995 99 1 * DATARECORD (TYPE# 0) 1014 BYTES * Total Data Records: 18 Tape File Start Depth = 8875.000000 Tape File End Depth = 8150.000000 Tape File Level Spacing = 0.500000 Tape File Depth Units = Feet **** FILE TRAILER **** LIS representation code decoding summary: Rep Code: 68 21206 datums Tape Subtile: 5 81 records... Minimum record length: 62 bytes Maximum record length: 1014 bytes Tape Subtile 6 is type: LIS FILE HE.a~ER FILE NUMBER: 5 RAW MWD Curves and log header data for each bit nm in separate tiles. BlT RUN NO: 6 DEFFH INCREMENT: .5000 # FILE SUMMARY VENDOR TOOL CODE START DEPTH GR 8806.0 9484.0 $ LOG HEADER DATA STOP DEPTH DATE LOGGED: 01-OCT-96 SOFTWARE SURFACE SOFTWARE VERSION: 4.88 DOWNHOLE SOFTWARE VERSION: 5.46 DATA TYPE ('MEMORY OR REAL-TIME): MEMORY TD DRILLER (FT): TOP LOG INTERVAL (FT): BOTTOM LOG INTERVAL (FT): BIT ROTATING SPEED (RPM): HOLE INCLINATION (DEG) MINIMUM ANGLE: MAXIMUM ANGLE: TOOL STRING (TOP TO BOTFO~ VENDOR TOOL CODE TOOL TYPE DGR DUAL GAMMA RAY $ 9547.0 8870.0 9547.0 0 14.8 17.8 BOREHOLE AND CASING DATA OPEN HOLE BIT SIZE ON): DRILLER'S CASING DEPTH (FT): TOOL NUMBER P0581CG6 8.500 4669.0 BOREHOLE CONDITIONS MUD TYPE: LSND MUD DENSITY (LB/G): 10.00 MUD VISCOSITY (S): 46.0 MUD PH: 9.5 MUD CHLORIDES (PPM): 700 FLUID LOSS (C3): 4.6 RESISTIVITY (OHMM) AT TEMPERATURE (DEGF) MUD AT MEASURED TEMPERATURE (MT): MUD AT MAX CIRCULATING TEMPERATURE: MUD FILTRATE AT MT: .000 .0 MUD CAKE AT MT: .000 .0 NEUTRON TOOL MATRIX: MATRIX DENSITY: .000 .0 .000 136.0 HOLE CORRECTION (IN): .000 TOOL STANDOFF (IN): EWR FREQUENCY [HZ): .0 REMARKS: MWD RUN 6. $ CN WN FN COLIN STAT : BP EXPLORATION (ALASKA) : 4-34/O-38 : DUCK ISLAND/ENDICOTT : NORTH SLOPE * FORMAT RECORD (TYPE//64) ONE DEPTH PER FRAME Tape det~ ID: F API API API API Log Crv Crv Name Tool Code Samples Units Size Length Typ Typ Cls Mod 1 GR MWD 68 1 AAPI 4 4 90 310 01 1 2 ROP MWD 68 1 FPHR 4 4 90 995 99 1 * DATARECORD (TYPE# 0) 1014 BYTES * Total Data Records: 18 Tape File Start Depth = 9550.000000 Tape File End Depth = 8800.000000 Tape File Level Spacing = 0.500000 Tape File Depth Units = Feet **** FILE TRAILER **** LIS representation code decoding summary: Rep Code: 68 245367 datums Tape Subtile: 6 81 records... Minimum record length: 62 bytes Maximum record length: 1014 bytes Tape Subtile 7 is type: LIS FILE HEADER FILE NUMBER: 6 RAW MWD Curves and log header data for each bit nm in separate files. BIT RUN NO: 7 D~ INCREMENT: .5000 # FILE SUMMARY VEeR TOOL CODE START DEPTH GR 9465.0 9835.0 $ LOG HEADER DATA STOP DEPTH DATE LOC_,GED: 02-OCT-96 SOFTWARE SURFACE SOFTWARE VERSION: 4.88 DOWNHOLE SOFTWARE VERSION: 5.46 DATA TYPE (MEMORY OR REAL-TIME): MEMORY TD DRILLER (FT): TOP LOG INTERVAL (FT): BOTTOM LOG INTERVAL (FT): BIT ROTATING SPEED (RPM): HOLE INCLINATION (DEG) MINIMUM ANGLE: MAXIMUM ANGLE: 9876.0 9547.0 9876.0 0 13.6 17.0 TOOL STRING (TOP TO BoTro~ VENIX)R TOOL CODE TOOL TYPE DGR DUAL GAMMA RAY $ TOOL NUMBER P0581CG-6 BOREHOLE AND CASING DATA OPEN HOLE BIT SIZE (IN): DRILLER'S CASING DEPTH (FT): 8.500 4669.0 BOREHOLE CONDITIONS MUD TYPE: LSND MUD DENSITY (LB/G): 10.00 MUD VISCOSITY (S): 46.0 MUD PH: 9.5 MUD CHLORIDES (PPM): 700 FLUID LOSS (C3): 4.6 RESISTIVITY (OHMM) AT TEMPERATURE (DEGF) MUD AT MEASURED TEMPERATURE (MT): MUD AT MAX CIRCULATING TEMPERATURE: MUD FILTRATE AT MT: .000 .0 MUD CAKE AT MT: .000 .0 .0 129.0 NEUTRON TOOL MATRIX: MATRIX DENSITY: HOLE CORRECTION ON): .000 TOOL STANDOFF (12'4): EWR FREQUENCY (HZ): .0 REMARKS: MWD RUN 7. $ CN WN FN COUN STAT : BP EXPLORATION (ALASKA) : 4-34/O-38 : DUCK ISLAND/ENDICOTT : NORTH SLOPE * FORMAT RECORD (TYPE# 64) ONE DEPTH PER FRAME Tape depth ID: F API API API API Log Crv Crv Name Tool Code Samples Units Size Length Typ Typ Cls Mod 1 GR MWD 68 1 AAPI 4 4 90 310 01 1 2 ROP MWD 68 1 FPHR 4 4 90 995 99 1 * DATA RECORD (TYPE# 0) Total Data Records: 11 1014 BYTES * Tape File Start Depth = 9900.000000 Tape File End Depth = 9450.000000 Tape File Level Spacing = 0.500000 Tape File Depth Units = Feet **** FILE TRAILER **** LIS representation code decoding summary: Rep Code: 68 23910 datums Tape Subtile: 7 74 records... Minimum record length: 62 bytes Maximum record length: 1014 bytes Tape Subtile 8 is B~e: LIS FILE HEADER FILE NUMBER: 7 RAW MWD Curves and log header data for each bit nm in separate files. BIT RUN NO: 8 DEPTH INCREMENT: .5000 FILE SUMMARY VENDOR TOOL CODE START DEPTH GR 9824.0 10177.0 $ LOG HEADER DATA DATE LOCKED: 04-OCT-96 SOFTWARE SURFACE SOFTWARE VERSION: DOWNHOLE SOFTWARE VERSION: DATA TYPE (MEMORY OR REAL-TIME): TD DRILLER (FT): 10200.0 TOP LOG INTERVAL (FT): 9876.0 BOTTOM LOG INTERVAL (Fr): 10200.0 BIT ROTATING SPEED (RPM): 0 HOLE INCLINATION (DEG) MINIMUM ANGLE: 17.1 ~ ANGLE: 52.0 STOP D~ 4.88 5.46 MEMORY TOOL STRING (TOP TO BOTTOM) VENDOR TOOL CODE TOOL TYPE DGR DUAL GAMMA RAY $ TOOL NUMBER P0581CG6 BOREHOLE AND CASING DATA OPEN HOLE BIT SIZE (IN): DRILLER'S CASING DEPTH (FT): 8.500 4669.0 BOREHOLE CONDITIONS MUD TYPE: MUD DENSITY (LB/G): MUD VISCOSITY (S): MUD PH: MUD CHLORIDES (PPM): FLUK) LOSS (C3): SHEARDRIL-N 10.20 54.0 8.4 11000 6.2 RESISTIVITY (OHMM) AT TEMPERATURE (DEGF) MUD AT MEASURED TEMPERATURE (MT): MUD AT MAX CIRCULATING TEMPERATURE: MUD FILTRATE AT MT: .000 .0 MUD CAKE AT MT: .000 .0 .000 .000 .0 127.0 NEUTRON TOOL MATRIX: MATRIX DENSITY: HOLE CORRECTION (IN): .000 TOOL STANDOFF (IN): EWR FREQUENCY (HZ): REMARKS: MWD RUN 8. $ CN WN FN COUN STAT : BP EXPLORATION (ALASKA) :4-34/0-38 : DUCK ISLAND/ENDICOTT : NORTH SLOPE * FORMAT RECORD (TYPE# 64) ONE DEPTH PER FRAME Tape depth ID: F 2 Curves: API AP1 API AP1 Log Crv Crv Name Tool Code Samples Units Size Length Typ Typ Cls Mod GR MWD 68 1 AAPI 4 4 90 310 01 1 ROP MWD 68 1 FPHR 4 4 90 995 99 1 8 * DATARECORD (TYPE# 0) 1014 BYTES * Total Data Records: 11 Tape File Start Depth = 10225.000000 Tape File End Depth = 9800.000000 Tape File Level Spacing = 0.500000 Tape File Depth Units = Feet ****FILETRAILER**** LIS representation code decoding summary: Rep Code: 68 247921damms Tape Subtile: 8 74 records... Minimum record length: 62 bytes Maximum record length: 1014 bytes Tape Subtile 9 is t)qoe: LIS FILE HEADER FILE NUMBER: 8 RAW MWD Curves and log header data for each bit nm in separate files. BIT RUN NO: 9 DEPTH INCREMENT: .5000 FILE SUMMARY VENDOR TOOL CODE START DEPTH GR 10163.0 10522.0 $ LOG HEADER DATA DATE LOGGED: 06-ocr-96 SOFTWARE SURFACE SOFTWARE VERSION: DOWNHOLE SOFTWARE VERSION: DATA TYPE (MEMORY OR REAL-TIME): TD DRILLER (FT): 10555.0 10200.0 10555.0 0 TOP LOG INTERVAL (leT): BOTTOM LOG INTERVAL (Fr): BIT ROTATING SPEED (RPM): HOLE INCLINATION (DEG) MINIMUM ANGLE: MAXIMUM ANGLE: TOOL STRING (TOP TO BOSOM) VENI)OR TOOL CODE TOOL TYPE DGR DUAL GAMMA RAY $ BOREHOLE AND CASING DATA OPEN HOLE BIT SIZE 02q): DRILLER'S CASING DEPTH (FT): 61.5 88.5 BOREHOLE CONDITIONS MUD TYPE: MUD DENSITY (LB/G): MUD VISCOSITY (S): MUD PH: MUD CHLORIDES (PPM): FLUID LOSS (C3): STOP DEPTH 4.88 5.46 MEMORY TOOL NUMBER P0581CG6 8.500 4669.0 SHEARDRIL-N 10.20 60.0 8.4 10500 4.4 RESISTIVITY (OHMM) AT TEMPERATURE (DEGF) MUD AT MEASURED TEMPERATURE (MT): MUD AT MAX CIRCULATING TEMPERATURE: MUD FILTRATE AT MT: .000 .0 MUD CAKE AT MT: .000 .0 NEUTRON TOOL MATRIX: MATRIX DENSITY: .000 .0 .000 133.0 HOLE CORRECTION (IN): TOOL STANDOFF (IN): EWR FREQUENCY (HZ): REMARKS: MWD RUN 9. $ CN WN FN COUN STAT : BP EXPLORATION (ALASKA) : 4-34/0-38 : DUCK ISLAND/ENDICOTr : NORTH SLOPE .000 * FORMAT RECORD (TYPE//64) ONE DEPTH PER FRAME Tape depth ID: F API API API API Log Crv Crv Name Tool Code Samples Units Size Length Typ Typ Cls Mod 1 GR MWD 68 1 AAPI 4 4 90 310 01 1 2 ROP MWD 68 1 FPHR 4 4 90 995 99 1 * DATA RECORD (TYPE# 0) 1014 BYTES * Total Data Records: 11 Tape File Start Depth = 10575.000000 Tape File End Depth = 10150.000000 Tape File Level Spacing = 0.500000 Tape File Depth Units = Feet **** FILE TRAILER **** LIS representation code decoding summary: Rep Code: 68 26464 datums Tape Subtile: 9 74 records... Minimum record length: 62 ~tes Maximum record length: 1014 bytes Tape Subtile 10 is t3~e: LIS FILE HEADER FILE NUMBER: 9 RAW MWD Curves and log header data for each bit run in separate files. .5000 BIT RUN NO: 10 DEFITI INCREME~: # FILE SUMMARY VENDOR TOOL CODE START DEPTH GR 9870.0 10956.0 EWR4 9841.0 10929.0 CN-P 9851.0 10936.0 SLD 9861.0 10945.0 $ # LOG HEADER DATA STOP DEPTH DATE LOCKED: 08-OCT-96 SOFTWARE SURFACE SOFTWARE VERSION: 4.88 DOWNHOLE SOFTWARE VERSION: 5.46 DATA TYPE (MEMORY OR REAL-TIME): MEMORY TD DRILLER tFT): TOP LOG INTERVAL (FT): BoTroM LOG INTERVAL (FT): BIT ROTATING SPEED (RPM): HOLE INCLINATION (DEG) MINIMUM ANGLE: MAXIMUM ANGLE: 10989.0 10555.0 10989.0 0 88.4 91.0 TOOL STRING (TOP TO BOTTOM) VENDOR TOOL CODE TOOL TYPE TOOL NUMBER EWR4 ELECTROMAG. RESIS. 4 P0590CRNDC~ CNP COMPENSATED NEUTRON P0590CRNDG6 SLD LITHO DENSITY P0590CRNDG6 DGR DUAL GAMMA RAY P0590CRNDG6 $ BOREHOLE AND CASING DATA OPEN HOLE BIT SIZE ON): DRILLER'S CASING DEPTH (F'r): 8.500 4669.0 BOREHOLE CONDITIONS MUD TYPE: MUD DENSITY (LB/G): MUD VISCOSITY (S): MUD PH: MUD CHLORIDES (PPM): FLUID LOSS (C3): SHEARDRIL-N 10.40 54.0 8.4 11000 3.8 RESISTIVITY (OHMM) AT TEMPERATURE (DEGF) MUD AT MEASURED TEMPERATURE (MT): .360 62.0 MUD AT MAX CIRCULATING TEMPERATURE: .169 140.0 MUD FIL~TE AT MT: MUD CAKE AT MT: NEUTRON TOOL MATRIX: MATRIX DENSITY: HOLE CORRECTION (IN): SANDSTONE 2.65 8.500 TOOL STANDOFF ON): EWR FREQUENCY (HZ): .0 0 REMARKS: MWD RUN 10. $ CN WN FN COUN STAT : BP EXPLORATION (ALASKA) : 4-34/O-38 : DUCK ISLAND/ENDICOTr : NORTH SLOPE 62.0 62.0 * FORMAT RF_,C~RD (TYPE# 64) ONE DEPTH PER FRAME Tape depth ID: F 13 Curves: API API API API Log Crv Crv Name Tool Code Samples Units Size Length Typ Typ Cls Mod 1 GR MWD 68 1 AAPI 4 4 90 310 01 1 2 RPXMWD 68 1 OHMM 4 4 90 995 99 1 3 RPS MWD 68 1 OHMM 4 4 90 220 09 1 4 RPM MWD 68 1 OHMM 4 4 90 995 99 1 5 RPD MWD 68 1 OHMM 4 4 90 220 10 1 6 N-PHI MW]) 68 1 PU-S 4 4 90 995 99 1 7 FCNTMWD 68 1 CPS 4 4 90 995 99 1 8 NCNTMWD 68 1 CPS 4 4 90 995 99 1 9 RHOBMWD 68 1 G/C3 4 4 90 995 99 1 10 DRHOMWD 68 1 G/C3 4 4 90 995 99 1 11 PEF MWD 68 1 BN/E 4 4 90 358 01 1 12 FET MWD 68 1 HR 4 4 90 995 99 1 13 ROP MWD 68 1 FPHR 4 4 90 995 99 1 52 * DATARECORD (TYPE# 0) 1014 BYTES * Total Data Records: 131 Tape File Start Depth = 11000.000000 Tape File End Depth = 9825.000000 Tape File Level Spacing = 0.500000 Tape File Depth Units = Feet **** FILE TRAILER **** LIS representation code decoding summary: Rep Code: 68 280836 datums Tape Subtile: 10 200 records... Minimum record length: 62 bytes Maximum record length: 1014 bytes Tape Subtile 11 is t)?pe: LIS EWR4 CNP SLD DGR $ # FILE HEADER FILE NUMBER: 10 RAW MWD Curves and log header data for each bit mn in separate files. BIT RUN NO: 11 DEPTH INCREMENT: .5000 FILE SUMMARY VENDOR TOOL CODE START DEPTH STOP DEPTH GR 10932.0 ! 1026.0 EWR4 10904.0 10999.0 CNP 10913.0 11006.0 SLD 10923.0 11015.0 $ LOG HEADER DATA DATE LOGGED: 09-OCT-96 SOFTWARE SURFACE SOFTWARE VERSION: 4.88 DOWNHOLE SOFTWARE VERSION: 5.46 DATA TYPE (MEMORY OR REAL-TIME): MEMORY TD DRILLER (Fr): 11059.0 TOP LOG INTERVAL (FT): 10989.0 BOTTOM LOG INTERVAL (FT): 11059.0 BIT ROTATING SPEED (RPM): 0 HOLE INCLINATION (DEG) MINIMUM ANGLE: 90.5 MAXIMUM ANGLE: 90.7 TOOL STRING (TOP TO BOTTOM) VENDOR TOOL CODE TOOL TYPE ELECTROMAG. RESIS. 4 COMPENSATED NEUTRON LITHO DENSITY P0590CRNDG6 DUAL GAMMA RAY P0590CRNDG6 TOOL NUMBER P0590CRNDG6 P0590CRNDG6 BOREHOLE AND CASING DATA OPEN HOLE BIT SIZE ON): DRILLER'S CASING DEPTH (Fr): 8.500 4669.0 SHEARDRIL-N 10.60 52.0 9.0 11000 5.4 BOREHOLE CONDITIONS MUD TYPE: MUD DENSITY (LB/G): MUD VISCOSITY (S): MUD PH: MUD CHI.,ORIDES (PPM): FLUID LOSS (C3): RESISTIVITY (OHMM) AT TEMPERATURE (DEGF) MUD AT MEASURED TEMPERATURE (MT): MUD AT MAX CIRCULATING TEMPERATURE: .350 .160 60.0 145.0 MUD FILTRATE AT MT: MUD CAKE AT MT: .280 .390 NEUTRON TOOL MATRIX: MATRIX DENSITY: HOLE CORRECTION ON): SANDSTONE 2.65 8.500 TOOL STANDOFF (IN): EWR FREQUENCY (HZ): .0 0 Pdt,lARKS: MWD RUN 11. $ CN WN FN COUN STAT : BP EXPLORATION (ALASKA) : 4-34/0-38 : DUCK ISLAND/ENDICOTt : NORTH SLOPE 60.0 60.0 * FORMAT RECORD (TYPE# 64) ONE DEPTH PER FRAME Tape depth ID: F 13 Curves: API AP1 AP1 AP1 Log Crv Crv Name Tool Code Samples Units Size Length Typ Typ Cls Mod 1 GR MWD 68 1 AAPI 4 4 90 310 01 1 2 RPX MWD 68 1 OHMM 4 4 90 995 99 3 RPS MWD 68 1 OHMM 4 4 90 220 09 4 RPM MWD 68 1 OHMM 4 4 90 995 99 5 RPD MWD 68 1 OHMM 4 4 90 220 10 6 NPHIMWD 68 1 PU-S 4 4 90 995 99 1 7 FCNTMWD 68 1 CPS 4 4 90 995 99 1 8 NCNTMWD 68 1 CPS 4 4 90 995 99 1 9 RHOBMWD 68 1 G/C3 4 4 90 995 99 1 10 DRHOMWD 68 1 G/C3 4 4 90 995 99 1 11 PEF MWD 68 1 BN/E 4 4 90 358 01 1 12 FET MWD 68 1 HR 4 4 90 995 99 1 13 ROP MWD 68 1 FPHR 4 4 90 995 99 1 52 * DATA RECORD (TYPE# 0) 1014 BYTES * Total Data Records: 20 Tal~ File Start Depth = 11075.~ Tape File End Depth = 10900.000000 Tape File Level Spacing = 0.500000 Tape File Depth Units = Feet **** FILE TRAH.ER **** LIS representation code decoding summary: Rep Code: 68 31379 datums Tape Subtile: 11 89 records... Minimum record length: 62 bytes Maximum record length: 1014 bytes Tape Subtile 12 is t).~e: LIS FILE HEADER FILE NUMBER: 11 RAW MWD Curves and log header data for each bit nm in separate files. BIT RUN NO: 12 DEPTH INCREMENT: .5000 FILE SUMMARY VENDOR TOOL CODE START DEPTH STOP DEPTH GR 11026.0 11690.0 EWR4 10999.0 11663.0 CNP 11006.0 11670.0 SLD 11016.0 11679.0 $ LOG HEADER DATA DATE LOCKED: 11-OCT-96 SOFTWARE SURFACE SOFTWARE VERSION: 4.88 DOWNHOLE SOFrWARE VERSION: 5.46 DATA TYPE (MEMORY OR REAL-TIME): MEMORY TD DRILLER (FT): 11724.0 TOP LOG INTERVAL (FT): 11059.0 BoTroM LOG INTERVAL (Fr): 11724.0 BIT ROTATING SPEED (RPM): 0 HOLE INCLINATION (DEG) MRqlMUM ANGLE: 87.6 MAXIMUM ANGLE: 90.2 TOOL STRING (TOP TO BOTTOM) VENDOR TOOL CODE TOOL TYPE TOOL NUMBER EWR4 ELECTROMAG. RESIS. 4 P0590CRNDG6 CNP COMPENSATED NEUTRON P0590CRNDG6 SLD LITHO DENSITY P0590CRNDG6 DGR DUAL GAMMA RAY P0590CRNDG6 $ BOREHOLE AND CASING DATA OPEN HOLE BIT SIZE ON): 8.500 DRILLER'S CASING DEPTH (FT): 4669.0 BOREHOLE CONDITIONS MUD TYPE: SHEARDRIL-N MUD DENSITY (LB/G): 10.60 MUD VISCOSITY (S): 56.0 MUD PH: 8.5 MUD C}E_,ORIDES (PPM): 11000 FLUID LOSS (C3): 4.8 RESISTIVITY (OHMM) AT TEMPERATURE (DEGF) MUD AT MEASURED TEMPERATURE (MT): .360 MUD AT MAX CIRCULATING TEMPERATURE: .164 68.0 157.0 MUD FILTRATE AT MT: MUD CAKE AT MT: .28O .500 NEUTRON TOOL MATRIX: MATRIX DENSITY: HOLE CORRECTION ON): SANDSTONE 2.65 8.500 TOOL STANDOFF ON): EWR FREQUENCY (HZ): .0 0 REMARKS: MWD RUN 12. $ CN WN FN COUN STAT :BP EXPLORATION (ALASKA) : 4-34/O-38 : DUCK ISLANDfENDICOTT : NORTH SLOPE 68.0 68.0 * FORMAT RECORD (TYPE# 64) ONE DEPTH PER FRAME Tape depth ID: F 13 Curves: API API AP1 API Log Crv Crv Name Tool Code Samples Units Size Length Typ Typ Cls Mod 1 GR MWD 68 1 AAPI 4 4 90 310 01 1 2 RPX MWD 68 1 OHMM 4 4 90 995 99 3 RPS MWD 68 1 OHMM 4 4 90 220 09 4 RPM MWD 68 1 OHMM 4 4 90 995 99 5 RPD MWD 68 1 OHMM 4 4 90 220 10 6 NPHIMWD 68 1 PU-S 4 4 90 995 99 1 7 FCNTMWD 68 1 CPS 4 4 90 995 99 1 8 NCNTMWD 68 1 CPS 4 4 90 995 99 1 9 RHOBMWD 68 1 G/C3 4 4 90 995 99 1 10 DRHOMWD 68 1 G/C3 4 4 90 995 99 1 11 PEF MWD 68 1 BN/E 4 4 90 358 01 1 12 FET MWD 68 1 HR 4 4 90 995 99 1 13 ROP MWD 68 1 FPHR 4 4 90 995 99 1 52 * DATA RECORD (TYPE# 0) 1014 BYTES * Total Data Records: 87 Tape Ffle Start DelXh = 11750.000000 Tape File End De~ = 10975.000000 Tape File Level Spacing = 0.500000 Tape File Depth Units = Feet **** FILE TRAILER **** LIS representation code decoding summary: Rep Code: 68 302551 datums Tape Subtile: 12 156 records... Minimum record length: 62 bytes Maxim.m record length: 1014 bytes Tape Subtile 13 is B-pe: LIS ~ HEADER FILE NUMBER: 12 RAW MWD Curves and log header data for each bit nm in separate files. BIT RUN NO: 13 DEPTH INCREMENT: .5000 FILE SUMMARY VENDOR TOOL CODE START DEPTH GR 11691.0 12152.0 EWR4 11664.0 12125.0 CNP 11671.0 12132.0 SLD 11680.0 12141.0 $ # LOG HEADER DATA DATE LOGGED: SOFTWARE 13-OC~-96 12183.0 STOP DEPTH 4.88 5.46 MEMORY 11724.0 12183.0 0 SURFACE SOFTWARE VERSION: DOWNHOLE SOFTWARE VERSION: DATA TYPE ('MEMORY OR REAL-TIME): TI) DRIII.ER (FT): TOP LOG INTERVAL (FT): BOTTOM LOG INTERVAL (FT): BIT ROTATING SPEED (PPM): HOLE INCLINATION (DEG) MINIMUM ANGLE: 87.5 MAXIMUM ANGLE: 89.1 TOOL STRING (TOP TO BoTroM) VENDOR TOOL CODE TOOL TYPE TOOL NUMBER EWR4 ELECTROMAG. RESIS. 4 P0590CRNDC,-6 CNP COMPENSATED NEUTRON P0590CRNDG6 SLD LITHO DENSITY P0590CRNDG6 DGR DUAL GAMMA RAY P0590CRNDG6 $ BOREHOLE AND CASING DATA OPEN HOLE BIT SIZE (IN): DRILLER'S CASING DEPTH (F'r): 8.500 4669.0 BOREHOLE CONDITIONS MUD TYPE: MUD DENSITY (LB/G): MUD VISCOSITY (S): MUD PH: MUD CHLORIDES (PPM): FLUID LOSS (C3): SHEARDRIL-N 10.60 66.0 8.0 9500 4.2 RESISTIVITY (OHMM) AT TEMPERATURE (DEGF) MUD AT MEASURED TEMPERATURE (MT): .480 66.0 MUD AT MAX CIRCULATING TEMPERATURE: .204 165.0 MUD FTL~TE AT MT: MUD CAKE AT MT: .360 .720 NEUTRON TOOL MATRIX: MATRIX DENSITY: HOLE CORRECTION (IN): SANDSTONE 2.65 8.500 TOOL STANDOFF (IN): EWR FREQUENCY (HZ): .0 0 REMARKS: MWD RUN 13. $ CN WN FN COUN STAT : BP EXPLORATION (ALASKA) : 4-34/O-38 : DUCK ISLAND/ENDICOTt : NORTH SLOPE 66.0 66.0 * FORMAT RECORD (TYPE# 64) ONE DEPTH PER FRAME Tape depth 1D: F 13 Curves: AP1 AP1 API AP1 Log Crv Crv Name Tool Code Samples Units Size Length Typ Typ Cls Mod 1 GR MWD 68 1 AAPI 4 4 90310 01 1 2 RPXMWD 68 1 OHMM 4 4 90 995 99 1 3 RPS MWD 68 1 OHMM 4 4 90 220 09 1 4 RPM MWD 68 1 OHMM 4 4 90 995 99 1 5 RPD MWD 68 1 OHMM 4 4 90 220 10 1 6 NPHIMWD 68 1 PU-S 4 4 90 995 99 1 7 FCNTMWD 68 1 CPS 4 4 90 995 99 1 8 NCNTMWD 68 1 CPS 4 4 90 995 99 1 9 RHOBMWD 68 1 G/C3 4 4 90 995 99 1 10 DRHOMWD 68 1 G/C3 4 4 90 995 99 1 11 PEF MWD 68 1 BN/E 4 4 90 358 01 1 12 FET MWD 68 1 HR 4 4 90 995 99 1 13 ROP MWD 68 1 FPHR 4 4 90 995 99 1 52 * DATA RECORD (TYPE# 0) 1014 BYTES * Total Data Records: 62 Tape File Start Depth = 12200.000000 Tape File EndDepth = 11650.000000 Tape File Level Spacing = 0.500000 Tape File Depth Units = Feet **** FILE TRAILER **** LIS representation code decoding summary: Rep Code: 68 46794 dat~ams Tape Subtile: 13 131 records... Minimum record length: 62 bytes Maximum record length: 1014 bytes Tape Subtile 14 is type: LIS FILE HEADER FILE NUMBER: 13 RAW MWD Curves and log header data for each bit mn in separate files. .5000 BIT RUN NO: 14 DEPTH INCREMENT: # FILE SUMMARY VENI2~R TOOL CODE START DEPTH GR 12149.0 12259.0 EWR4 12122.0 12231.0 CNP 12129.0 12239.0 SLD 12140.0 12248.0 $ LOG HEADER DATA DATE LOCKED: SOFTWARE SURFACE SOFTWARE VERSION: DOWNHOLE SOFTWARE VERSION: DATA TYPE (MEMORY OR REAL-TIME): TD DRILLER (FT): 12284.0 15-OCT-96 STOP DEPTH TOP LOG INTERVAL (FT): BOTTOM LOG INTERVAL (FT): BIT ROTATING SPEED (RPM): HOLE INCLINATION (DEG) IvffbriMUM ANGLE: MAX]MUM ANGLE: TOOL STRING (TOP TO BoTroM) VENDOR TOOL CODE TOOL TYPE TOOL NUMBER EWR4 ELECTROMAG. RESIS. 4 P0590CRNDG6 CNP COMPENSATED NEUTRON P0590CRNDG6 SLD LYITIO DENSITY P0590CRNDG6 DGR DUAL GAMMA RAY P0590CRNDG6 $ BOREHOLE AND CASING DATA OPEN HOLE BIT SIZE (l]q): DRILLER'S CASING DEPTH (FT): 8.500 4669.0 BOREHOLE CONDITIONS MUD TYPE: MUD DENSITY (LB/(}): MUD VISCOSITY (S): MUD PH: MUD CHLORIDES (PPM): FLUID LOSS (C3): SHEARDR]L-N 10.60 66.0 8.5 9000 5.0 RESISTIVITY (OHMM) AT TEMPERATURE (DEGF) MUD AT MEASURED TEMPERATURE (MT): .380 68.0 MUD AT MAX CIRCULATING TEMPERATURE: .160 169.0 12183.0 12284.0 0 88.1 88.1 4.88 5.46 MEMORY MUD FILTRATE AT MT: MUD CAKE AT MT: .270 .460 NEUTRON TOOL MATRIX: MATRIX DENSITY: HOLE CORRECTION (IN): SANDSTONE 2.65 8.500 TOOL STANDOFF (IN): EWR FREQUENCY (HZ): .0 0 REMARKS: MWD RUN 14. $ CN WN FN COUN STAT :BP EXPLORATION (ALASKA) : 4-34/0-38 : DUCK ISLAND/ENDICO'I~ : NORTH SLOPE- 68.0 68.0 * FORMAT RECORD (TYPE# 64) ONE DEPTH PER FRAME Tape depth ID: F 13 Curves: AP1 API API API Log Crv Crv Name Tool Code Samples Units Size Length Typ Typ Cls Mod 1 GR MWD 68 1 AAPI 4 4 90 310 01 1 2 RPX MWD 68 1 OHMM 4 4 90 995 99 1 3 RPS MWD 68 1 OHMM 4 4 90 220 09 1 4 RPM MWD 68 1 OHMM 4 4 90 995 99 1 5 RPD MWD 68 1 OHMM 4 4 90 220 10 1 6 NPHIMWD 68 1 PU-S 4 4 90 995 99 1 7 FCNTMWD 68 1 CPS 4 4 90 995 99 1 8 NCNTMWD 68 1 CPS 4 4 90 995 99 1 9 RHOBMWD 68 1 G/C3 4 4 90 995 99 1 10 DRHOMWD 68 1 G/C3 4 4 90 995 99 1 11 PEF MWD 68 1 BN/E 4 4 90 358 01 1 12 FET MWD 68 1 HR 4 4 90 995 99 1 13 ROP MWD 68 1 FPHR 4 4 90 995 99 1 52 * DATARECORD (TYPE# 0) 1014 BYTES * Total Data Records: 23 Tape File Start DelXh = 12300.000000 Tape File End Depth -- 12100.000000 Tape File Level Spacing -- 0.500000 Tape File Depth Units -- Feet **** FILE TRAILER **** LIS representation code decoding summary: Rep Code: 68 308166 datum~ Tape Subtile: 14 92 records... Minimum record length: 62 bytes Maximum record length: 1014 bytes Tape Subtile 15 is type: LIS FILE HEADER FILE NUMBER: 14 RAW MWD Curves and log header data for each bit nm in separate files. BIT RUN NO: 15 DEPTH INCREMENT: .5000 # FILE SUMMARY VENDOR TOOL CODE START DEPTH GR 12259.0 12394.0 EWR4 12232.0 12366.0 CN-P 12239.0 12374.0 SLD 12248.0 12383.0 $ # LOG HEADER DATA DATE LOCKED: SOFTWARE 17-OCT-96 STOP DEPTH SURFACE SOFTWARE VERSION: DOWNHOLE SOFTWARE VERSION: DATA TYPE (MEMORY OR REAL-TIME): TD DRILLER (P~: 12416.0 4.88 5.46 MEMORY TOP LOG INTERVAL (FT): BOTTOM LOG INTERVAL (FT): BlT ROTATING SPEED (RPM): HOLE INCLINATION (DEG) MINIMLrM ANGLE: MAX]MUM ANGLE: 12284.0 12416.0 0 79.7 86.0 TOOL STRING (TOP TO BoTro~ VENDOR TOOL CODE TOOL TYPE TOOL NUMBER EWR4 ELECTROMAG. RESIS. 4 P0591CRNDG6 CNP COMPENSATED NEUI~ON P0591CRNDG6 SLD LITHO DENSITY P0591CRNDG6 DGR DUAL GAMMA RAY P0591CRNDG6 $ BOREHOLE AND CASING DATA OPEN HOLE BIT SIZE ON): DRILLER'S CASING DEPTH (F'r): 8.500 4669.0 BOREHOLE CONDITIONS MUD TYPE: MUD DENSITY (LB/G): MUD VISCOSITY (S): MUD PH: MUD CHLORIDES (PPM): FLUID LOSS (C3): SHEARDRIL-N 10.60 67.0 8.5 10500 5.2 RESISTIVITY (OHMM) AT TEMPERATURE (DEGF) MUD AT MEASURED TEMPERATURE (MT): .350 70.0 MUD AT MAX CIRCULATING TEMPERATURE: .138 169.0 MUD FILTRATE AT MT: MUD CAKE AT MT: .260 .440 NEUTRON TOOL MATRIX: MATRIX DENSITY: HOLE CORRECTION (IN): SANDSTONE 2.65 8.500 TOOL STANDOFF (IN): EWR FREQUENCY (HZ): .0 0 REMARKS: MWD RUN 15. $ CN WN FN COUN STAT : BP EXPLORATION (ALASKA) : 4-34/O-38 : DUCK ISLAND/ENDIC(YI~ : NORTH SLOPE 70.0 70.0 * FORMAT RECORD (TYPE# 64) ONE DEFFH PER FRAME Tape depth ID: F 13 Curves: API API API API Log Crv Crv Name Tool Code Samples Units Size Length Typ Typ Cls Mod 1 GR MWD 68 1 AAPI 4 4 90 310 01 1 2 RPX MWD 68 1 OHMM 4 4 90 995 99 1 3 RPS MWD 68 1 OHMM 4 4 90 220 09 1 4 RPM MWD 68 1 OHMM 4 4 90 995 99 1 5 RPD MWD 68 1 OHMM 4 4 90 220 10 1 6 N-PHIMWD 68 1 PU-S 4 4 90 995 99 1 7 FCNTMWD 68 1 CPS 4 4 90 995 99 1 8 NCNTMWD 68 1 CPS 4 4 90 995 99 1 9 RHOBMWD 68 1 G/C3 4 4 90 995 99 1 10 DRHOMWD 68 1 G/C3 4 4 90 995 99 1 11 PEF MWD 68 1 BN/E 4 4 90358 01 1 12 FET MWD 68 1 HR 4 4 90 995 99 1 13 ROP MWD 68 1 FPHR 4 4 90 995 99 1 52 * DATA RECORD (TYPE# 0) 1014 BYTES * Total Data Records: 28 Tape File Start Depth = 12450.000000 Tape File End ~ = 12200.000000 Tape File Level Spacing = 0.500000 Tape File Depth Units = Feet **** FILE TRAILER **** LIS representation code decoding summary: Rep Code: 68 53809 da~ms Tape Subtile: 15 97 records... Minimum record length: 62 bytes Maximum record length: 1014 bytes Tape Subtile 16 is t)A0e: LIS EWR4 CNP SLD DGR $ # FILE HEADER FILE NUMBER: 15 RAW ~ Curves and log header data for each bit nm in separate files. BIT RUN NO: 16 DEPTH INCREMENT: .5000 FILE SUMMARY VENDOR TOOL CODE START DEPTH STOP DEPTH GR 12384.0 12905.0 EWR4 12357.0 12878.0 CNP 12364.0 12885.0 SLD 12374.0 12895.0 $ LOG HEADER DATA DATE LOCKED: 20-OCT-96 SOFTWARE SURFACE SOFTWARE VERSION: , 4.88 DOWNItOLE SOPWWARE VERSION: 5.46 DATA TYPE (MEMORY OR REAL-TIME): MEMORY TD DRILLER (FT): 12940.0 TOP LOG INTERVAL (FT): 12416.0 BOTrOM LOG INTERVAL (FT): 12940.0 BIT ROTATING SPEED (RPM): 0 HOLE INCLINATION (DEG) MINIMUM ANGLE: 59.6 MAXIMUM ANGLE: 76.3 TOOL STRING (TOP TO BOTI'OM) VENDOR TOOL CODE TOOL TYPE TOOL NUMBER ELECTROMAG. RESIS. 4 P0591CRNDC_ffi COMPENSATED NEUTRON P0591CRNDC_~ LITHO DENSITY P0591CRNDG6 DUAL GAMMA RAY P0591CRNDG6 BOREHOLE AND CASING DATA OPEN HOLE BIT S173:*~ ON): DRILLER'S CASING DEPTH (FT): BOREHOLE CONDITIONS MUD TYPE: MUD DENS~ (LB/G): MUD VISCOSITY (S): MUD PH: MUD CHLORIDES (PPM): FLUID LOSS (C3): 8.500 4669.0 RESISTIVITY (OHMM) AT TEMPERATURE (DEGF) MUD AT MEASURED TEMPERATURE (MT): .350 70.0 MUD AT MAX CIRCULATING TEMPERATURE: .127 184.0 SHEARDRIL-N 10.60 69.0 8.3 8500 5.2 Tape Subtile 17 is t)3~e: LIS 97/1/28 01 **** REEL TRAILER **** 97/1/28 01 Tape Subtile: 17 2 records... Minimum record length: 132 bytes Maximum record length: 132 bytes End of execution: Tue 28 JAN 97 11:36a Elapsed execution time = 7.03 seconds. SYSTEM RETURN CODE = 0