Alaska Logo
Department of Commerce, Community, and Economic Development
Alaska Oil and Gas Conservation
Commission
Loading...
HomeMy WebLinkAbout196-114 Pages NOT Scanned in this Well History File XHVZE This page identifies those items that were not scanned during the initial scanning project. They are available in the original file and viewable by direct inspection. Iq~..,(I~ File Number of Well History File PAGES TO DELETE Complete RESCAN Color items - Pages: Grayscale, halftones, pictures, graphs, charts - Pages: [] Poor Quality Original - Pages: [] Other- Pages: DIGITAL DATA [] Diskettes, No. [] Other, No/Type OVERSIZED [] Logs of various kinds [] Other COMMENTS: Scanned by: Bevedy~Vincent Nathan Lowell TO RE-SCAN Notes: Re-Scanned by: Bevedy Dianna Vincent Nathan Lowell Date: Is~ v: "R^mRA13 wF^?'q�;¢MFc "_c :. ry 4 dNgRv'wnPiF�4^ • . bp BP Exploration (Alaska) Inc. Attn: Well Integrity Coordinator, PRB -20 Post Office Box 196612 Anchorage, Alaska 99519 -6612 December 30, 2011 / 4 T) FEB 2 2 '632 /‘ Mr. Tom Maunder Alaska Oil and Gas Conservation Commission 333 West 7 Avenue Anchorage, Alaska 99501 Subject: Corrosion Inhibitor Treatments of MPE -Pad Dear Mr. Maunder, Enclosed please find multiple copies of a spreadsheet with a list of wells from MPE -Pad that were treated with corrosion inhibitor in the surface casing by conductor annulus. The corrosion inhibitor is engineered to prevent water from entering the annular space and causing external corrosion that could result in a surface casing leak to atmosphere. The attached spreadsheet represents the well name, API and PTD numbers, top of cement depth prior to filling and volumes of corrosion inhibitor used in each conductor. As per previous agreement with the AOGCC, this letter and spreadsheet serve as notification that the treatments took place and meet the requirements of form 10 -404, Report of Sundry Operations. If you require any additional information, please contact me or my alternate, Gerald Murphy, at 659 -5102. Sincerely, Mehreen Vazir BPXA, Well Integrity Coordinator • 0 BP Exploration (Alaska) Inc. Surface Casing by Conductor Annulus Cement, Corrosion inhibitor, Sealant Top-off Report of Sundry Operations (10-404) MPE -Pad 10/10/2011 Corrosion Initial top of Vol. of cement Final top of Cement top off Corrosion inhibitor/ Well Name PTD # API # cement pumped cement date inhibitor sealant date ft bbls ft na gal MPE -02 1851910 50029214170000 3.8 NA 3.8 NA 5.95 8/23/2011 MPE -03 1890170 50029219160000 Tanko conductor NA NA NA NA NA MK-04 1900050 50029219970000 Tanko conductor NA NA NA NA NA MPE -05 1900810 50029220580000 Sealed conductor NA NA NA NA NA MPE-06 1910480 50029221540000 0.2 NA 0.2 NA 6.8 9/6/2011 MPE -07 1910490 50029221550000 Sealed conductor NA NA NA NA NA MPE-08 1910500 50029221560000 Sealed conductor NA NA NA NA NA MPE-09 1941320 50029225130000 14.0 NA Need top job MPE -10 1941430 50029225210000 0.9 NA 0.9 NA 7.65 8/23/2011 MPE -11 1950010 50029225410000 11.0 NA Need top job MPE -12 2050670 50029232620000 1.0 NA 1.0 NA 4.25 8/23/2011 MPE -1313 2020440 50029225360200 Dust Cover NA NA NA 57.8 9/6/2011 MPE -14 1970050 50029227340000 0.0 NA 0.0 NA 7.65 10/10/2011 MPE -15 1941530 50029225280000 0.8 NA 0.8 NA 8.5 8/26/2011 - > MPE -16 1961140 50029226860000 0.6 NA 0.6 NA 5.95 8/26/2011 MPE -17 1961150 50029226870000 12.8 NA Need top job MPE -18 1970420 50029227480000 2.3 NA 2.3 NA 17 8/23/2011 MPE -19 1970370 50029227460000 0.1 NA 0.1 NA 7.65 10/10/2011 MPE -20A 2040540 50029225610100 1.0 NA 1.0 NA 6.8 8/23/2011 MPE -21 1981150 50029228940000 3.0 NA 3.0 NA 10.2 8/23/2011 MPE -22 1950810 50029225670000 0.8 NA 0.8 NA 3.4 8/23/2011 MPE -23 1950940 50029225700000 1.6 NA 1.6 NA 15.3 9/6/2011 MPE -24A 2001860 50029228670100 0.2 NA 0.2 NA 5.1 9/6/2011 MPE -25A 2040450 50029229800100 2.0 NA 2.0 NA 15.3 8/23/2011 MPE -26 2002060 50029229940000 Dust Cover NA NA NA 5.1 9/6/2011 MPE -28 2050550 50029232590000 1.8 NA 1.8 NA 15.3 8/23/2011 MPE -29 2010370 50029230040000 Dust Cover NA NA NA 3.4 9/6/2011 MPE -30A 2010110 50029229030100 0.3 NA 0.3 NA 2.55 8/26/2011 MPE -31 2050720 50029232630000 2.0 NA 2.0 NA 13.6 8/23/2011 MPE-32 2050650 50029232610000 1.5 NA 1.5 NA 13.6 8/23/2011 MPE -33 1981280 _ 50029228980000 4.1 NA 4.1 NA 7.65 8/23/2011 NOT OPERABLE: Injector MPE-16 (PTD #1961140) Cancel UIC MITIA until on injecti... • Maunder, Thomas E (D4A) From: AK, D&C Well Integrity Coo~inator [AKDCV1Iel11ntegrityCoordinatorr~p.cornj Sent: Monday, July 12, 201fl 5:04 PM Page 1 of 1 To: AK, D&C Weil Integrityty Coordina#or; Regg, James B {DOA):; AK, OPS MPU OSM; Engel, Harry R; AK, OPS MPU Field Ops TL; AK, OPS MPU Well Ops Cooed; AK, RES MPU Production Optimization Engineer; AK, BPS MPU Wells Ops Cooed 2; Maunder, Thomas E {DOA); Schwartz., Guy L (DOA); Cismoski, Doug A; AK, D8~G Well Services {jperations Team Lead; AK, D&C Wireine C)perations Team Lead Cc: King, Whitney; Russell, James Subjec#: NOT OPERABLE: Injector MPE-16 (PTD #11140) Cancel UIC MITIA unta on injection .All, Injector MPE-18 (PTD#1961140) is a WAG injector due for UIC compliance testing bu# remains shut in. There are no plans to utilize the weft for injection due to lack of production off take. The well has bin reGassified as Not Operable until it is required for injection support. There are no downhole integrity concerns known with the well. The well has been added to the quarterly report of shut-in injectors sent to the AOGCC. The plan forward for the well is as follows: 1, Production Engineer: Notify We11 Integrity Coordinator when injection is needed 2. Fullbore: MITIA pre-injection 3. Well integrity Coordinator: Reclassify well as Under Evaluation 4. Operations: Place well on injection 5. Fuilbore_ AOGCC witnessed MIT-1A once thermally stable Please call Well integrity with any questions or cxincems. ~~~~„:,~~ ~~~ V(~J i ~ ~ ~ ~ Thank you, Tiffany Quy (for the Well Integrity Coordinator Gerald Murphy/Torin Roschinger) Projects Well Integrity Engineer phone: (907) 659-5102 cell: (253) 576-6153 tiffg0 ai7bp.com 7/13/2014 MEMORANDUM . State of Alaska . Alaska Oil and Gas Conservation Commission TO: Jim Regg P.I. Supervisor "/ Kerr j)13/CY DATE: Monday, July 31, 2006 SUBJECT: Mechanical Integrity Tests BP EXPLORATION (ALASKA) INC E-16 MILNE PT UNIT KR E-16 \~~/ liLt FROM: Jeff Jones Petroleum Inspector Src: Inspector Reviewed By: ;./7/';7 P.I. Suprv ..J t5 f--- Comm NON-CONFIDENTIAL Permit Number: 196-114-0 Inspector Name: Jeff Jones Inspection Date: 7/9/2006 Well Name: MILNE PT UNIT KR E-16 Insp Num: mitJJ060728070901 Rei Insp Num API Well Number 50-029-22686-00-00 Packer Depth We IIi E-16- . iType Inj. i W ! TVD 6647! ~ -~..~r=- 'I . P.T. I 1961140 TypeTest! SPT i Test psi 1661.75 i OA I Inte~~I_ 4~~ . p;-~. ,// Tubing! Notes 3.7 bbls diesel pumped. I well house inspected; no exceptions noted. Pretest Initial 15 Min. 30 Min. 45 Min. 60 Min. 900 1800 ___L~_ 20 120 .._-~-_._' I 750 !_~--L--~--L.-- IlO 100 I ~--¡------~T-·~-~ 2700 . 2700 2700 2700 {, ".; ,'" U ' Monday, July 31, 2006 Page I of I STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMMISSION REPORT OF SUNDRY WELL OPERATIONS 1. Operations performed: Operation shutdown_ Stimulate _ Plugging _ Perforate _ WAG SWAP Pull tubing _ Alter casing _ Repair well _ Other_X 2. Name of Operator BP Exploration (Alaska), Inc. 3. Address P. O. Box 196612 Anchorage, AK 99519-6612 5. Type of Well: Development _ Explorato~__ Stratigraphic~ Service__.X 4. Location of well at surface 1521' FNL, 1850' FEL, Sec. 25, T13N, R10E, UM At top of productive interval 3393' FNL, 989' FEL, Sec. 24, T13N, R10E, UM At effective depth 3184' FNL, 888' FEL, Sec. 24, T13N, R10E, UM At total depth 3133' FNL, 874' FEL, Sec. 24, T13N, R10E, UM (asp's 569295, 6016297) (asp's 570123, 6019713)~ (asp's 570222, 6019922X (asp's 570236, 6019973) 6. Datum elevation (DF or KB feet) RKB 56 feet 7. Unit or Property name Milne Point Unit 8. Well number MPE-16 9. Permit number / approval number 196-114 10. APl number 50-029-22686-00 11. Field / Pool Milne Point Unit / Kuparuk River Sands 12. Present well condition summary Total depth: measured true vertical 8407 feet Plugs (measured) 7362 feet Effective depth: measured 8302 feet Junk (measured) true vertical 7272 feet Casing Length Size Cemented Measured Depth True Vertical Depth Conductor 112' 20" 250 sx Arcticset I (Approx 144' 144' Surface 3950' 9-5/8" 990 sx PF 'E', 800 sx 3981' 3575' Class 'G' Production 8354' 7" 270 sx Class 'G' 8383' 7353' Perforation depth: measured Open Perfs 7834' - 7858', 7880' - 7904' true vertical Open Perfs 6874' - 6894', 6913' - 6933' Tubing (size, grade, and measured depth) Packers & SSSV (type & measured depth) RFCF 'V D · ,.:: , , Alaska Oil & Gas uo~)~,. ~jo~ij~r~i.~!ut AnchoragE, 3-1/2", 9.2#, L-80 Tubing to 7556'. 3-1/2", 9.2#, L-80 Straddle Tubing @ 7869'. 3-1/2", 9.2#, L-80 Tubing Tail @ 7906'. 7" x 3-1/2" Baker S-3 Packer @ 7556', 7" x 3-1/2" Baker S^BL-# Packer @ 7895'. No SSSV in well. 13. Stimulation or cement squeeze summary Intervals treated (measured) (see attached) Treatment description including volumes used and final pressure SCANNED FEB 0 & ?_003 14. Prior to well operation 01/21/2003 Subsequent to operation 01/25/2003 OiI-Bbl Representative Daily Averaqe Production or Injection Data Gas-Mcr Water-Bbl 2369 1139 Casing Pressure Tubing Pressure 3731 2422 15. Attachments Copies of Logs and Surveys run __ Daily Report of Well Operations __ 6. Status of well classification as: Oil _ Gas __ Suspended __ Service WAG INJECTOR 17. I hereby certify that the foregoing is true and correct to the best of my knowledge. Title: TechnicAl Assistant DeWayne R. Schnorr Form 10-404 Rev 06/15/88 · QBD S BFL FEB 3 onn~ Date January 27, 2003 Prepared b~/DeWayne R Schnorr 564-5174 SUBMIT IN DUPLICATE ~ MPE-16 DESCRIPTION OF WORK COMPLETED NRWO OPERATIONS O8/07/2OO2 08/13/2OO2 09/28/2002 11/27/2002 01/23/2003 SLICKLINE: OPEN 'C' SANDS FOR INJECTION WAG SWAP: WATER TO GAS INJECTION WAG SWAP: GAS TO WATER INJECTION WAG SWAP: WATER TO GAS INJECTION WAG SWAP: GAS TO WATER INJECTION EVENT SUMMARY 08/07/02 PULLED DGLV FROM TOP STRADDLE, SET CV. 'C' SAND ONLY INJECTION. 08/13/02 WELL SUPPORT TECHS RIGGED UP AND FLUSHED SENSOR LINES, GREASED TREE, AND SWAPPED BLINDS. ALL FLANGES WERE TORQUE TO SPEC. HB&R RIGGED UP AND PUMPED 20 BBLS METHANOL DOWN TUBING, PUMPED @ 1.5 BPM AT 3150 PSI. SWITCHED TO WATER LEG AND PUMPED 2 BBLS DOWN IT. JOB WAS COMPLETED WITH NO PROBLEMS WITH NO PROBLEMS AND WELL WAS PUT ON INJECTION. 09/28/2002 PJSM. SUPPORT ROLLED BLINDS TO LINE UP FOR WATER INJECTION AND TORQUE FLANGES TO SPEC. MIRU HB&R PT'd TO 4500 PSI. PUMPED 5 BBLS METHANOL DOWN THE TUBING AT 1.5 BPM @ 3800 PSI. SWITCHED TO SOURCE WATER, PUMPED 80 BBLS AT 1.5 TO 2.3 BPM @ 3800 TO 3250 PSI & 1 BBL METHANOL CAP. RDMO. WELL WAS LINED UP FOR WATER AND PUT ON INJECTION @ 1000 BWPD. 11/27/02 WELL SUPPORT TECHS RIGGED UP AND FLUSHED SENSOR LINES,GREASED TREE, AND SWAPPED BLINDS. ALL FLANGES WERE TORQUE TO SPEC. HB&R RIGGED UP ANDPUMPED 20 BBLS METHANOL DOWN TUBING, PUMPED AT 1 BPM @ 2800 PSI. SWITCHED TO WATER LEG AND PUMPED 2 BBLS DOWN IT. NOTE: THE ORIFICE PLATE WAS CHANGED OUT TO A 0.875. JOB WAS COMPLETED WITH NO PROBLEMS AND WELL WAS PUT ON 01/23/03 HB&R RIGGED UP AND PUMPED 10 BBLS METHANOL DOWN TUBING AND FOLLOWED IT WITH 87 BBLS SOURCE WATER. PUMPED 3 BBLS METHANOL TO FREEZE PROTECT LINE ON TRUCK. JOB WAS COMPLETED WITH NO PROBLEMS AND WELL WAS TURNED OVER TO OPERATOR TO PUT ON INJECTION. FLUIDS PUMPED BBLS 63 METHANOL 167 SOURCE WATER 23O TOTAL ,SCANNED FEB 0 4 2003 Page I MEMORANDUM State of Alaska Alaska Oil and Gas Conservation Commission TO: Cammy O Taylor Chairman DATE: July 25, 2002 THRU: Tom Maunder P.I. Supervisor FROM: Chuck $cheve Petroleum Inspector NON- CONFIDENTIAL SUBJECT: Mechanical Integrity Tests BPX MPU E MPU E-16 Milne Point Packer Depth Pretest Initial 15 Min. 30 Min. WelIIMPUE-161Typelnj. N I T.V.D. 6935 ITubingl 1550 1760I 1700I 1650 Ilntervall 0 p.T.D.I 196-114 ITypetestl P ITestpsiI 1734 I Casingl 200 I 1800 I 1760 I 1750 I"'~ I" Notes: reported tubing leak - Notes: Interval Type INJ. Fluid Codes F = FRESH WATER INJ. G = GAS INJ. S = SALT WATER INJ. N = NOT INJECTING Type Test M= Annulus Monitoring P= Standard Pressure Test R= Internal Radioactive Tracer Survey A= Temperature Anomaly Survey D= Differential Temperature Test I= Initial Test 4= Four Year Cycle V= Required by Variance W= Test during Workover O= Other (describe in notes) Test's Details I traveled to BPXs MPU E-16 well and witnessed the co tubing and IA MIT. This well reportedly has a tubing leak though the pretest pressures would not indicate it. The pretest tubing and casing pressures were observed for 1 hour+ and found to be stable. With a plug set in the tubing tail the tubing and casing were then pressured up to approximately equal pressures and observed for 30 minutes. The casing demonstrated good integrity while the slow decline in tubing pressure indicated a slow leak past the plug. M.I.T.'s performed: 1_ Attachments: Number of Failures: 0 Total Time during tests: 2 hours CC: SCANNED/ U ; 1 g 2002 MIT report form 5/12/00 L.G. MIT MPU E-16 7-25-02 CS.xls 7/31/2002 MEMORANDUM State of Alaska Alaska Oil and Gas Conservation Commission TO: Cammy O Taylor Chairman THRU: Tom Maunder.-- P.I. Superviso~'~ ~' FROM: Chuck Scheve Petroleum Inspector NON- CONFIDENTIAL DATE: May 20, 2002 SUBJECT: Mechanical Integrity Tests BPX X Pad PBU Prudhoe Bay Well X-28 P.T.D. 193-114 Notes: Well P.T.D. Notes: WellI P.T.D.I Notes: P.T.D.I Notes: Well P.T.D. Notes: Packer Depth Pretest Initial15 Min. 30 Min. Typelnj.I SI T.v.D.I~o TubingI lOOO lOOO lOOO lOOO I,nterva,I 4 ITypetestl P ITestpsil 2168 I CasingI 0 I 2290 I 23001 23001 P/F I P X-29 type lnj. S I T.V,D. 8538 TubingI 1175 1175 1000 850 ~ntervalI 4 193-139 ITypetestl P ITestpsil 2135 I CasingI 900 I 2220 I 2170 I 2150 I P/F I P X-33 Type lnj. S T.V.D. 18788 Tubing 1100 1100 11ool 11oo IntervalI 4 196-144 Type test P Test ps I 2197 Cas ng 675 2440 2360 2360 P/F I --P 196-167 ITypetestl P ITestpsil 2194 I Casingl 250 I 2360 I 2340 I 2340 I P/F I P i Type test Type INJ. Fluid Codes F = FRESH WATER INJ. G = GAS INJ. S = SALT WATER INJ. N = NOT INJECTING Type Test M= Annulus Monitoring P= Standard Pressure Test R= Internal Radioactive Tracer Survey A= Temperature Anomaly Survey D= Differential Temperature Test Interval I= Initial Test 4= Four Year Cycle V= Required by Variance W= Test during Workover O= Other (describe in notes) Test's Details I traveled to BPXs X Pad and wimessed the 4-year MIT on wells X-28, X-29,X-33 and X-36. The pretest robing and casing pressures were observed and found to be stable. The casings were then pressured up and observed for 30 minutes with all 4 wells demonstrating good mechanical integrity. M.I.T.'s performed: 4_ Attachments: Number of Failures: _0 Total Time during tests: 3 houm CC: MIT report form 5/12/00 L.G. MIT PBU X Pad 5~20-02 CS.xls 6/3/02 STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMMISSION REPORT OF SUNDRY WELL OPERATIONS 1. Operations performed: Operation shutdown_ Stimulate _ Plugging _ Perforate _ WAG SWAP Pull tubing _ Alter casing _ Repair well _ Other_X WAG SWAP 2. Name of Operator BP Exploration (Alaska), Inc. 3. Address P. O. Box 196612 Anchora~le, AK 99519-6612 4. Location of well at surface 1520' FNL, 1849' FEL, Sec. 25, T13N, R10E, UM At top of productive interval 3392' FNL, 988' FEL, Sec. 24, T13N, R10E, UM At effective depth 3183' FNL, 887' FEL, Sec. 24, T13N, R10E, UM At total depth 3133' FNL, 873' FEL, Sec. 24, T13N, R10E, UM 5. Type of Well: Development __ Explorato~__ Stratigraphic__ Service__X (asp's 569295, 6016297) (asp's 570123, 6019713) (asp's 570222, 6019922) (asp's 570236, 6019973) 6. Datum elevation (DF or KB feet) RKB 56 feet 7. Unit or Property name Miline Point Unit MPE-16 9. Permit number / approval number 196-1140 10. APl number 50-029-22686-00 11. Field / Pool Miline Point Unit / Kuparuk River Sands 12. Present well condition summary Total depth: measured true vertical 8407 feet Plugs (measured) 7362 feet Effective depth: measured true vertical 8302 feet Junk (measured) 7272 feet Casing Length Size Conductor 80' 20" Surface 3950' 9-5/8" 7" Productio~,~% ~,,~"~ 8354' Perforation deptb~,,n~ ~neasured Open Peals 7834' - 7858', 7880' - 7904' true ve~ical Open Pe~s 6874'- 6894', 6913'- 6933' Cemented 250 sx Amticsetl (Approx) 990 sx PF 'E', 800 SX Class 'G' 270 sx Class 'G' Measured Depth True VerticalDepth 112' 112' 3981' 3575' Tubing (size, grade, and measured depth) 3-1/2", 9.2#, L-80 NSCT TBG to 7556' MD. 3-1/2" L-80 TBG 7556' - 7869', Tubing T. @ 7906'. Packers & SSSV (type & measured depth) 7" x 3-1/2" S-3 Baker Packer @ 7556', 7" x 3-1/2" SABL-3 Baker Packer @ 7869'. No SSSV. 13. Stimulation or cement squeeze summary Intervals treated (measured) (see attached) Treatment description including volumes used and final pressure 14. Prior to well operation 02/24/2002 Subsequent to operation 02/27/2002 OiI-Bbl Representative Daily Averaqe Production or Iniection Data Gas-Mcf Water-Bbl 1080 2326 Casing Pressure Tubing Pressure 2106 3137 15. Attachments Copies of Logs and Surveys run __ Daily Report of Well Operations __ 6. Status of well classification as: Oil __ Gas __ Suspended __ Service WAG Injector ~j~correct to the best ~fitle~YTke~n~lc~dl :::,stant DeWayne R. Schnorr Date February 28, 2002 Prepared by DeWayne R Schnorr 564-5174 Form 10-404 Rev 06/15/88 · ORIGINAL SUBMIT IN DUPLICATE~ MPE-16 DESCRIPTION OF WORK COMPLETED NRWO OPERATIONS 02/26/2002 SWAP WELL FROM WATER TO GAS INJECTION. EVENT SUMMARY 02/26~02 WELL SUPPORT TECHS SWAPPED BLINDS AND TORQUE TO SPEC FOR WELL TO TAKE GAS INJECTION. THE SENSOR LINES WERE ALSO PURGED WITH HYDRAULIC FLUID. HB&R RIGGED UP AND PUMPED 18 BBLS METHANOL DOWN TUBING AND 2 BBLS DOWN THE WATER LEG. JOB WAS COMPLETED WITH NO PROBLEMS AND WELL WAS TURNED OVER TO PUT BACK ON INJECTION. FLUIDS PUMPED BBLS DISCRIPTION 2O METHANOL 20 TOTAL Page 1 STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMMISSION REPORT OF SUNDRY WELL OPERATIONS 1. Operations performed: Operation shutdown_ Stimulate _ Plugging _ Perforate _ WAG SWAP Pull tubing _ Alter casing _ Repair well _ Other _X 2. Name of Operator BP Exploration (Alaska), Inc. 3. Address P. O. Box 196612 Anchorage, AK 99519-6612 4. Location of well at surface 1521' FNL, 1850' FEL, Sec. 25, T13N, R10E, UM At top of productive interval 3393' FNL, 989' FEL, Sec. 24, T13N, R10E, UM At effective depth 3184' FNL, 888' FEL, Sec. 24, T13N, R10E, UM At total depth 3133' FNL, 874' FEL, Sec. 24, T13N, R10E, UM 5. Type of Well: Development _ Explorato~._ Stratigraphic~ Service__X (asp's 569295, 6016297) (asp~ 570122 6019713) (asp's 570222, 6019922) (asp~ 57023~ 6019973) 6. Datum elevation (DF or KB feet) RKB 56 feet 7. Unit or Property name Milne Point Unit 8. Well number MPE-16 9. Permitnumber/approvalnumber 196-114 10. APInumber 50-029-22686-00 11. Field / Pool Milne Point Unit / Kuparuk River Sands 12. Present well condition summary Total depth: measured true vertical 8407 feet Plugs (measured) 7362 feet Effective depth: measured true vertical Casing Length Conductor 112' Surface 3950' Production 8354' 8302 feet Junk (measured) 7272 feet Size Cemented 20" 250 sx Arcticset I (Approx 990 sx PF 'E', 800 sx 9-5/8" Class 'G' 7" 270 sx Class 'G' Measured Depth True Vertical Depth 144' 144' 3981' 3575' 8383' 7353' Perforation depth: measured Open Perfs 7834' - 7858', 7880' - 7904' true vertical Open Perfs 6874' - 6894', 6913'- 6933' Anchorage Tubing (size, grade, and measured depth) Packers & SSSV (type & measured depth) 3-1/2", 9.2#, L-80 Tubing to 7556'. 3-1/2", 9.2#, L-80 Straddle Tubing @ 7869'. 3-1/2", 9.2#, L-80 Tubing Tail @ 7906'. 7" x 3-1/2" Baker S-3 Packer @ 7556', 7" x 3-1/2" Baker SABL-# Packer @ 7895'. No SSSV in well. 13. Stimulation or cement squeeze summary Intervals treated (measured) (see attached) Treatment description including volumes used and final pressure 14. Prior to well operation 03/30/2002 Subsequent to operation 04/15/2002 OiI-Bbl Representative Daily Averaqe Production or Injection Data Gas-Mcf Water-Bbl 3235 2545 Casing Pressure Tubing Pressure 3037 2472 15. Attachments Copies of Logs and Surveys run _ Daily Report of Well Operations __ I16. Status of well classification as: Oil __ Gas __ 9uspended __ 9ervice WAG INJECTOR T~tle: Technical Assistant DeWar/ne R Schnorr Form 10-404 Rev 06/15/88 · Date May 09, 2002 Prepared b~/DeWayne R Schnorr 564-5174 _ SCANNED MAY 2 8 2002 SUBMIT IN DUPLICATE 04/04/2002 04/04/02 MPE-16 DESCRIPTION OF WORK COMPLETED NRWO OPERATIONS WAG SWAP: GAS TO WATER INJECTION EVENT SUMMARY HB&R RIGGED UP AND PUMPED 2 BBLS DIESEL DOWN THE FLOWLINE TO FLUSH OUT THE NGL's. WELL SUPPORT TECHS SWAPPED THE BLINDS FOR WELL TO TAKE WATER INJECTION. ALL FLANGES WERE TORQUE TO SPEC. HB&R RIGGED UP AND PUMPED 16 BBLS METHANOL DOWN TUBING AND FOLLOWED IT WITH 88 BBLS SOURCE WATER. PUMPED 4 BBLS METHANOL TO FREEZE PROTECT LINE ON TRUCK. CONCLUSION: JOB WAS COMPLETED WITH NO PROBLEMS AND WELL WAS TURNED OVER TO OPERATOR TO PUT ON INJECTION. FLUIDS PUMPED BBLS 2O METHANOL 2 DIESEL 88 SOURCE WATER 110 TOTAL Page 1 THE MATERIAL UNDER THIS COVER HAS BEEN MICROFILMED ON OR BEFORE JANUARY 03,2001 P L M ATE IA L U W N D E I~ TH IS M ARK E R C.LORI~MFILM.DOC P E RM I T DATA ......... AOGCC Individual Well Geological Materials Inventory T DATA PLUS 96-114 96-114 96-114 96-114 96-114 96-114 96-114 96-114 96-114 96-114 96-114 96-114 96-114 ADN-MD ~L'"'3900-8290 CDR-MD ~'~900-8400 CDR-TVD ~3500-7310 ADN- TVD ~3500-7300 7563 ~CHLUM CDR/~N PERF ~834-7904 PACKER ~7774-7895 DEPTH/GR/CCL ~ 0-8255 CBL ~350-8276 DIR SRVY ~CHLUM 0-8407.1 MLrLTI SHOT SRVY ~PERRY 3926.31-8407. MULTI SHOT SRVY ~R/GYRO 0-8251. INJP ~/~600-7960 10-407 ~COMPLETION DATE /~/)Q/~/ DAILY WELL ePS R // /~//~/ TO /~.~ /jJ/<~/ Are dry ditch samples required? yes ~__~.An~ d received? Was the well cored? yes ~':~ ~alysis & description received? Are well tests required?}~yes. Well is in compliance In'~tial CemENTS Page: 1 Date: 11/25/98 RUN RECVD FINAL 01/10/97 FINAL 01/10/97 FINAL 01/10/97 FINAL 01/10/97 1 01/10/97 FINAL 01/24/97 FINAL 01/24/97 FINAL 01/24/97 FINAL 01/24/97 05/28/97 05/28/97 05/28/97 FIANL 07/03/97 ~/~ / I~ ~ ,~ , GeoQuest 500 W. International Airport Road Anchorage, AK 99518-1199 ATTN: Sherrie NO. 11118 Company: Field: Alaska Oil & Gas Cons Comm Attn: Lori Taylor 3001 Porcupine Drive Anchorage, AK 99501 Milne Point (Cased Hole) 6/30/97 Well Job # Log Description Date BL RF Sepia LIS Tape MPU B-14 L,~- ~ (-' ...... INJECTION PROFILE 970607 1 1 MPU E-07 ~.L ~ C .... INJECTION PROFILE 970606 I 1 M.PU E-16 ~-" INJECTION PROFILE 970605 I 1 MPU F-05 ~---' PERFORATION RECORD 97051 7 I 1 MPU F-05 ~... TEMP & PRESSURE SURVEY 9 7051 7 I I ~ MPU F-05 ~" GR/CCL LOG 970517 I 1 MPU F-26 ~ .... GR/CCL LOG 970525 I 1 MPU F-26 ~-' STATIC PRESS &TEMP 970527 1 1 MPU F-26 v' PERFORATION RECORD 970527 1 1 MPU F-50 .... PERFORATION RECORD 9 70 508 1 1 MPU F-50 ...... STATIC PRESSURE SURVEY 970509 1 1 MPU F-57 '/'" PERFORATION RECORD 97051 2 1 1 MPU F-62 ~" (..[.I K INJECTION PROFILE 970608 1 1 MPU F-65 ' ..--' PERFORATION RECORD 97051 I I 1 MPH -07 ..-' GR/CCL RECORD 9 7042 4 I 1 MPH -07 '.- GR/CCL RECORD 970 42 7 I I 7.- o'3 1 PLEASE ACKNOWLEDGE RECEIPT BY SIGNING AND RETURNING ONE COPY EACH TO: BP Exploration (Alaska) Inc. Petrotectnical Data Center MB3-3 900 E. Benson Blvd. Anchorage, Alaska 99519-6612 Date Delivered: Schlumberger GeoQuest 500 W. International Airport Road Anchorage, Alaska 99618-1199 Received ~~ STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMMISSION WELL COMPLETION OR REOOMPLETION REPORT AND LOG 1. Status of Well Classification of Service Well []Oil I--~Gas []--]Suspended [--lAbandoned [~Service Water & Gas Injector 2. Name of Operator 7. Permit Number BP Exploration (Alaska)Inc. 96-114 ...... 3. Address 8. APl Number P.O. Box 196612, Anchorage, Alaska 99519-6612 50-029-22686 4. Location of well at surface,'~-'-7:""'""~: ~ '~- !!~',. :,.~ ~ :~' -,~ ~ ....... !~'I 9. UnitMilneOrpointLeaSeunitName 3758' NSL, 1849' WEL, SEC. 25, T13N, R10E !~',-'.'~,77 ;:: ':(ri ~t~.~';'l~ 10. Well Number At top of productive interval ~, ..~,Z.~.~ i! ~,,4,~I~ 1887'At totalNSL'depth989' WEL, SEC. 24, T13N, R10E ~ ~?/L:.!~ i. , MPE-16i :;~ ~-¢_...~~ 11. Fieldand Pool 2176' NSL, 910' WEL, SEC. 24, T13N, RIOE Milne Point Unit / Kuparuk River ~5. Elevation in feet (indicate KB, DF, etc.) 16. Lease Designation and Serial No. Sands KBE = 56'I ADL 047437 "1"'. Date S puddedl 1/23/96 113' Date I'D' Reached I 14' Date C°mp" Susp" °r Aband'115' Water depth' if °ffsh°re 16' N°' °f C°mpleti°nsl 1/29/96 12/30/96 N/A MSL One 17. Total Depth (MD+TVD)8407 7362 FT,II 8' Plug Back Depth (MD+TVD)I19' Directi°nal Survey 120' Depth where SSSV set 121 ' Thickness °f Permafr°st8302 7272 FTI ~ Yes [--} No N/A MD 1800' (Approx.) 22. Type Electric or Other Logs Run MWD, LWD, DIR/FE/DD, EMS, Gyro, GR/CCL, GR/JB ......... 23. CASING~ LINER AND CEMENTING RECORD CASING SETTING DEPTH HOLE SIZE WT. PER FT. GRADE TOP BOTTOM SIZE CEMENTING RECORD AMOUNT PULLED 20" 91.1 # NT80LHE 32' 112' 30" 250 SX Arcticset I (Approx.) .......... 9-5/8" 40# L-80 31' 3981' 12-1/4" 990 sx PF 'E', 800 sx Class 'G' 7" 26# L-80 29' 8383' 8-1/2" 270 sx Class 'G' ......... ....... 24. Perforations open to Production (MD+TVD of Top and 25. TUBING RECORD Bottom and interval, size and number) SIZE DEPTH SET (MD) PACKER SET (MD) 4-1/2" Gun Diameter, 5 spf 3-1/2", 9.2#, L-80 7907' 7556' MD TVD MD TVD 7869' 7834'-7858' 6874'-6894' 7880'-7904' 6913'-6933' 26. AC~D, FRACTURE, CEMENT SQUEEZE, ETC. DEPTH INTERVAL (MD) AMOUNT & KIND OF MATERIAL USED Freeze Protect with 75 bbls diesel 27. PRODUCTION TEST ........ Date First Production I Method of Operation (Flowing, gas lift, etc.) Januan/21, 1997 I Electric Submersible Pump ........ Date of Test iHours Tested PRODUCTION FOR OIL-DEL GAS-MCF WATER-DEL CHOKE SIZE I GAS-OIL RATIO TEST PERIOD I Flow Tubing Casing Pressure CALCULATED OIL-BBL GAS-MCF WATER-DEL OIL GRAVITY-APl (CORR) Press. 24-Hour RATE 28. CORE DATA Brief description of lithology, porosity, fractures, apparent dips and presence of oil, gas or_water. Submit core chips. Form 10-407 Rev. 07-01-80 Submit In Duplicate 29. Geologic Markers 30. Formation Tests Measured True Vertical Include interval tested, pressure data, all fluids Marker Name Depth Depth recovered and gravity, GOR, and time of each phase. (Subsea) Top Kuparuk 7629' 6644' KC 1 7833' 6819' Top Kuparuk 'B' 7859' 6841' Top Kuparuk B7 7878' 6857' 31. List of Attachments Summary of Daily Drilling Reports, Surveys ...... 32' l hereby certify that~eg°ing is t~ue and I°~rect t° the best °f my kn°wledgesigned -/.. ~'c.-- ' /~2.,,/~ ~/~q /I,(---' ~cZ..'t4;~, Title Senior Drilling Engineer Date Tim Scofield -- / MPE-1 6i .//96-114 Prepared By Name/Number: Kathy Campoamor, 564-5122 Well Number v Permit No. / Approval No. ......... iNSTRUCTIONS GENERAL: This form is designed for submitting a complete and correct well completion report and Icg on all types of lands and leases in Alaska. ITEM 1: Classification of Service Wells: Gas injection, water injection, steam injection, air injection, salt water disposal, water supply for injection, observation, injection for in-situ combustion. ITEM 5: Indicate which elevation is used as reference (where not otherwise shown) for depth measurements given in other spaces on this form and in any attachments. ITEM 16 AND 24: If this well is completed for separate production from more than one interval (multiple completion), so state in item 16, and in item 24 show the producing intervals for only the interval reported in item 27. Submit a separate form for each additional interval to be separately produced, showing the data pertinent to such interval. ITEM 21: Indicate whether from ground level (GL) or other elevation (DF, KB, etc.). ITEM 23: Attached supplemental records for this well should show the details of any multiple stage cementing and the location of the cementing tool. ITEM 27: Method of Operation: Flowing, Gas Lift, Rod Pump, Hydraulic Pump, Submersible, Water Injection, Gas Injection, Shut-In, Other-explain. ITEM 28: If no cores taken, indicate 'none'. Form 10-407 Rev. 07-01-80 Facility Date/Time 21 Nov 96 22 Nov 96 23 Nov 96 24 Nov 96 25 Nov 96 M Pt E Pad Progress Report Well MPE- 16 Rig Nabors 22E Page 1 Date 16 May 97 06:00-06:30 06:30-09:00 09:00-09:30 09:30-12:00 12:00-19:00 19:00-21:00 21:00-00:00 00:00-03:00 03:00-06:00 06:00-06:30 06:30-10:00 10:00-12:00 12:00-17:30 17:30-18:00 18:00-18:30 18:30-01:00 01:00-04:00 04:00-06:00 06:00-06:30 06:30-09:30 09:30-10:30 10:30-11:30 11:30-12:15 12:15-13:00 13:00-18:00 18:00-18:30 18:30-02:30 02:30-03:30 03:30-05:00 05:00-06:00 06:00-06:30 06:30-10:30 10:30-11:30 11:30-12:30 12:30-13:30 13:30-14:30 14:30-18:00 18:00-18:30 18:30-20:30 20:30-22:00 22:00-00:00 00:00-01:30 01:30-03:30 03:30-04:30 04:30-06:00 06:00-06:30 06:30-07:30 07:30-08:30 08:30-13:30 13:30-14:30 14:30-17:00 17:00-20:00 20:00-21:00 21:00-22:30 Duration 1/2 hr 2-1/2 hr 1/2 hr 2-1/2 hr 7hr 2hr 3hr 3hr 3hr 1/2 hr 3-1/2 hr 2hr 5-1/2 hr 1/2 hr 1/2 hr 6-1/2 hr 3hr 2hr 1/2 hr 3hr lhr lhr 3/4 hr 3/4 hr 5hr 1/2 hr 8hr lhr 1-1/2 hr lhr 1/2 hr 4hr lhr lhr lhr lhr 3-1/2 hr 1/2 hr 2hr 1-1/2 hr 2hr 1-1/2 hr 2hr lhr 1-1/2 hr 1/2 hr lhr lhr 5hr lhr 2-1/2 hr 3hr lhr 1-1/2 hr Activity Held safety meeting Rigged down Drillfloor / Derrick Held safety meeting Rig moved 20.00 % Rig moved 50.00 % Rigged up Rig services Rigged up Divertor Rig moved 70.00 % Rig moved 85.00 % Held safety meeting Rigged up Rig services Serviced Rig services Rigged up Divertor Tested Divertor Held safety meeting Ran Drillpipe in stands to 0.0 ft Made up BHA no. 1 Drilled to 269.0 ft Held safety meeting Drilled to 543.0 ft Functioned downhole tools at 543.0 ft Drilled to 633.0 ft Pulled out of hole to 454.0 ft R.I.H. to 633.0 ft Drilled to 1080.0 ft Held safety meeting Drilled to 2027.0 ft Circulated at 2027.0 ft Pulled out of hole to 400.0 ft R.I.H. to 2027.0 ft Held safety meeting Drilled to 2971.0 ft Circulated at 2971.0 ft Pulled out of hole to 1088.0 ft Serviced Top drive R.I.H. to 2971.0 ft Drilled to 3633.0 ft Held safety meeting Drilled to 4000.0 ft Circulated at 4000.0 ft Pulled out of hole to 400.0 ft R.I.H. to 4000.0 ft Circulated at 4000.0 ft Pulled out of hole to 400.0 ft Pulled BHA Held safety meeting Pulled BHA Rigged up Casing handling equipment Ran Casing to 3981.0 ft (9-5/8in OD) Circulated at 3981.0 ft Mixed and pumped slurry - 280.000 bbl Circulated at 1314.0 ft Mixed and pumped slurry - 267.000 bbl Serviced Drillfloor / Derrick Facility M Pt E Pad Progress Report Well MPE-16 Page 2 Rig Nabors 22E Date 16 May 97 Date/Time 26 Nov 96 27 Nov 96 28 Nov 96 29 Nov 96 22:30-00:30 00:30-04:00 04:00-06:00 06:00-06:30 06:30-07:30 07:30-08:00 08:00-11:30 11:30-13:00 13:00-15:30 15:30-16:30 16:30-17:30 17:30-18:00 18:00-18:30 18:30-19:30 19:30-20:00 20:00-20:30 20:30-05:45 05:45-06:00 06:00-06:30 06:30-10:30 10:30-11:30 11:30-12:30 12:30-15:00 15:00-15:30 15:30-16:30 16:30-17:45 17:45-18:00 18:00-18:30 18:30-20:00 20:00-21:15 21:15-03:15 03:15-03:30 03:30-06:00 06:00-06:30 06:30-07:00 07:00-07:30 07:30-07:45 07:45-08:45 08:45-10:30 10:30-11:00 11:00-11:30 11:30-13:45 13:45-14:15 14:15-14:30 14:30-18:00 18:00-18:30 18:30-20:00 20:00-20:30 20:30-21:30 21:30-22:00 22:00-23:00 23:00-00:00 00:00-01:30 01:30-02:30 Duration 2hr 3-1/2 hr 2hr 1/2 hr lhr 1/2hr 3-1/2 hr 1-1/2 hr 2-1/2 hr lhr lhr 1/2 hr 1/2 hr lhr 1/2 hr 1/2 hr 9-1/4 hr 1/4 hr 1/2 hr 4hr lhr lhr 2-1/2 hr 1/2 hr lhr 1-1/4 hr 1/4 hr 1/2 hr 1-1/2 hr 1-1/4 hr 6hr 1/4 hr 2-1/2 hr 1/2 hr 1/2 hr 1/2 hr 1/4 hr lhr 1-3/4 hr 1/2 hr 1/2 hr 2-1/4 hr 1/2 hr 1/4 hr 3-1/2 hr 1/2 hr 1-1/2 hr 1/2 hr lhr 1/2 hr lhr lhr 1-1/2 hr lhr Activity Rigged down Divertor Rigged up BOP stack Tested BOP stack Held safety meeting Tested BOP stack Installed Wear bushing Made up BHA no. 2 Drilled installed equipment - Cementing packer R.I.H. to 3895.0 ft Tested Casing Repaired Top ram Tested Casing Held safety meeting Drilled installed equipment - Float collar Circulated at 4020.0 ft Performed formation integrity test Drilled to 5557.0 ft Held drill (Kick while drilling) Held safety meeting Drilled to 6218.0 ft Circulated at 6218.0 ft Pulled out of hole to 5557.0 ft Backreamed to 3981.0 ft Circulated at 3981.0 ft Serviced Block line R.I.H. to 6218.0 ft Held drill (Kick while tripping) Held safety meeting Drilled to 6501.0 ft Circulated at 6501.0 ft Drilled to 7162.0 ft Held drill (H2S) Drilled to 7411.0 ft Held safety meeting Circulated at 7411.0 ft Pulled out of hole to 6786.0 ft R.I.H. to 7411.0 ft Circulated at 7411.0 ft Pulled out of hole to 3981.0 ft Serviced Top drive R.I.H. to 5745.0 ft Logged hole with LWD: Formation evaluation (FE) from 5745.0 ft to 62 R.I.H. to 7411.0 ft Held drill (Fire) Drilled to 7745.0 ft Held safety meeting Drilled to 7914.0 ft Tested High pressure lines Pulled out of hole to 6860.0 ft Laid down 30.0 ft of 5in OD drill pipe R.I.H. to 7914.0 ft Drilled to 8106.0 ft Repaired Formation logs Logged hole with LWD: DIR/FE/DD from 8011.0 ft to 8106.0 ft 7.0 ft Facility M Pt E Pad Progress Report Well MPE-16 Page 3 Rig Nabors 22E Date 16 May 97 Date/Time 30 Nov 96 01 Dec 96 02:30-05:00 05:00-06:00 06:00-06:30 06:30-07:00 07:00-07:30 07:30-08:30 08:30-09:00 09:00-10:00 10:00-15:30 15:30-16:00 16:00-18:00 18:00-18:30 18:30-18:45 18:45-19:00 19:00-22:00 22:00-00:30 00:30-01:30 01:30-03:00 03:00-04:00 04:00-05:00 05:00-06:00 06:00-06:30 06:30-06:45 06:45-11:00 11:00-12:00 12:00-18:00 18:00-18:30 18:30-19:00 19:00-19:15 19:15-20:00 20:00-21:15 21:15-21:45 21:45-22:15 22:15-23:30 23:30-00:30 00:30-03:00 03:00-05:00 05:00-05:15 05:15-06:00 06:00-09:00 Duration 2-1/2 hr lhr 1/2 hr 1/2 hr 1/2 hr lhr 1/2 hr lhr 5-1/2 hr 1/2 hr 2hr 1/2 hr 1/4hr 1/4 hr 3hr 2-1/2 hr lhr 1-1/2 hr lhr lhr lhr 1/2hr 1/4 hr 4-1/4 hr lhr 6hr 1/2hr 1/2 hr 1/4 hr 3/4 hr 1-1/4 hr 1/2 hr 1/2 hr 1-1/4 hr lhr 2-1/2 hr 2hr 1/4 hr 3/4 hr 3hr Activity Drilled to 8407.0 ft Circulated at 8407.0 ft Held safety meeting Pulled out of hole to 7500.0 ft Circulated at 7500.0 ft Pulled out of hole to 3980.0 ft Serviced Top drive R.I.H. to 7442.0 ft Logged hole with LWD: Formation evaluation (FE) from 7442.0 ft to 80 R.I.H. to 8407.0 ft Circulated at 8407.0 ft Held safety meeting Held drill (Abandonment) Took EMS survey at 8317.0 ft Laid down 4550.0 ft of 5in OD drill pipe Pulled out of hole to 219.0 ft Pulled BHA Pulled BHA Worked on BOP - Top ram Rigged up Casing handling equipment Ran Casing to 400.0 ft (7in OD) Held safety meeting Held drill (Kick while tripping) Ran Casing to 3950.0 ft (7in OD) Circulated at 3950.0 ft Ran Casing to 7800.0 ft (7in OD) Held safety meeting Ran Casing to 8383.0 ft (7in OD) Rigged up Cement unit Circulated at 8383.0 ft Mixed and pumped slurry - 98.000 bbl Displaced slurry - 318.000 bbl Tested Casing Rigged down Cement unit Worked on BOP - Top ram Rigged down BOP stack Installed Xmas tree integral components Tested All tree valves Freeze protect well - 65.000 bbl of Diesel Freeze protect well - 65.000 bbl of Diesel tO.O ft SUMMARY OF DALLY OPERATIONS SHARED SERVICES DRILLING - BPX / ARCO Well Name: MPE-161 Rig Name: N-4ES AFE: 347032 Accept Date: 12/28/96 Spud Date: - Release Date: 12/30/96 Dec 28 1996 MIRU. Spot rig & berm. Raise & scope derrick. Rig accepted 12/28/96 @ 0600 hrs. Dec 29 1996 Rig hard line to TT & check for psi on well. ND tree & NU BOP's & install test plug. Test BOP's. Repair HCR valve on kill line. Test waived by Bobby Foster w/AOGCC. Install WR. Rig floor & RIH with 3-1/2" tubing & scraper & bit. Drift tubing. Displace diesel cap to TT. Cont to RIH with scraper & bit. Circ & cleaning sea water. Dec 30 1996 Cont to displace well with filtered sea water. POOH with bit & scraper. ND riser & NU shooting flange & SWS lub. Wait on N22E to finish cementing liner before loading perf guns. Test lub. Run #1 & perf with 4-1/2" gun 7880'-7904'. POOH. All shots fired. Run #2 & perf 7834'-7858'. POOH. All shots fired. Run SWS GR/JB to 7880'. Two runs, received 1,,~ cup metal 1st rrun. ND shooting flange & NU flow line & pull WR. Install RA tag & MU straddle packer assy. RIH with completion. Dec 31 1996 Cont to RIH with completion. RU SWS & RIH with GR/CCL. Log & position packers. POOH with SWS GR/CCL & RD same. Space out & MU hanger & LJ & land tubing. RILDS & set TWC. ND BOP's & NU tree & test. Rev sea water treated with corexit & follow with 55 bbl diesel for freeze protection & freeze protect tubing with 20 bbl diesel. Drop 1-5/16" setting ball with rod & psi tubing. Unable to hold tubing pressure constant. Appears to be leaking by ball in RHC plug. Test annulus. Test witnessed by Bobby Foster w/AOGCC. Set BPV & blow down lines. RD cellar & secure well. Clean pits. Rig released 12/30/96 @ 2400 hrs. Setting ball will be pulled & re-set & tubing tested by PE's. Page 1 Schlumberger ~NADRILL Survey Report Client: BP Field: MP Well Name: MPE-16i Permanent datum Depth measured from Elevation of kelly bushing Elevation of drill floor Elevation of ground level Magnetic Declination Grid Convergence Total Correction TIE IN POINT Measured depth 0.00 FT True vertical depth 0.00 FT N/S disp (-ve for S) 0.00 FT E/W disp (-ve for W) 0.00 FT 29-NOV-96 16:57:01 GROUND LEVEL 57.70 FT 57.50 FT 24.5 FT 28.25 DEG 0.00 DEG 28.25 DEG Inclination Azimuth Azimuth from rotary table to the target Minimum Curvature Method MEASURED INTERVAL VERTICAL TARGET STATION DEPTH DEPTH SECTION INCLN. FT FT FT FT DEG 0.0 0.00 0.00 0.00 0.00 112 . 0 112 . 00 112 . 00 0.00 0.00 223.6 111.60 223.60 0.55 0.66 314.8 91.20 314.78 2.28 1.63 372.9 58.10 372.84 4.37 2.64 466.1 93.20 465.89 9.31 3.81 558 . 3 92 . 20 557 . 84 15 . 56 4 . 58 647.8 89.50 646.97 22.99 5.91 740.7 92.90 739.22 32.92 7.57 8~_, 8 91 10 829 25 45 65 9 92 921.3 89.50 917.18 61.13 11.58 1012.6 91.30 1006.29 79.77 13.54 1105.6 93.00 1095.95 102.61 17.22 1200.0 94.40 1185.07 130.67 21.24 1295.7 95.70 1273.00 163.59 25.21 Page 001 1388.8 93.10 1356.17 199.45 28.17 1482.3 93.50 1438.16 239.08 29.32 1575.0 92.70 1518.36 281.75 30.89 1669.3 94.30 1598.65 329.11 32.47 1763.3 94.00 1677.50 379.56 33.54 1855.2 91.90 1754.37 429.68 32.93 1949.0 93.80 1833.21 480.46 32.73 2043.6 94.60 1913.08 531.15 32.07 2139.1 95.50 1994.04 581.80 32.00 2232.8 93.70 2073.13 632.02 32.85 0.00 DEG 11.84 DEG 2326.9 94.10 2152.36 682.74 32.45 2420.8 93.90 2231.75 732.86 32.12 2515.3 94.50 2311.92 782.85 31.81 2609.8 94.50 2392.33 832.45 31.56 2703.3 93.50 2472.04 881.29 31.48 AZIMUTH LATITUDE DEPARTURE DISPLA- at AZIMUTH DLS N/-S E/-W CEMENT DEG ET FT PT DEG D/H F 0.0 0.00 0.00 0.00 0.00 0.00 0.0 0.00 0.00 0.00 0.00 0.00 340.7 0.61 -0.21 0.64 340.70 0.59 20.8 2.32 0.07 2.32 1.84 1.32 29. 9 4.25 1.04 4.37 13.70 1.83 32.5 8.72 3.77 9.50 23.37 1.26 35.1 14.32 7.53 16.18 27.75 0.86 37.7 20.89 12.40 24.29 30.69 1.51 35.0 29.69 18.83 35.16 32.38 1.82 35.1 41.03 26.78 49.00 33.13 2.58 32.7 54.90 36.07 65.69 33.31 1.92 31.4 71.73 46.59 85.53 33.00 2.17 35.8 92.20 60.32 110.18 33.19 4.15 38.5 116.92 79.14 141.19 34.09 4.36 43.2 145.36 103.90 178.68 35.56 4.58 42.4 176.05 132.30 220.22 36.92 3.20 37.6 210.49 161.15 265.10 37.44 2.76 32.8 248.48 187.90 311.53 37.10 3.10 24.2 291.94 211.40 360.45 35.91 5.07 18.5 339.60 229.99 410.15 34.11 3.49 16.4 387.64 245.10 458.62 32.30 1.42 10.9 437.01 257.09 507.02 30.47 3.19 11.2 486.76 266.81 555.09 28.73 0.72 12.0 536.38 276.99 603.68 27.31 0.45 9.2 585.75 286.22 651.94 26.04 1.84 9.9 635.82 294.64 700.77 24.86 0.58 9.5 685.25 303.09 749.29 23.86 0.42 9.7 734.58 311.43 797.87 22.97 0.35 9.3 783.54 319.63 846.22 22.19 0.35 10.! 831.72 327.86 894.01 21.51 0.46 2797.1 93.80 2552.z~7 930 ...... 02 31 16 9.6 879 76 336 20 941 81 20 91 0.44 Schlumberger ANADRILL Survey Report 29-NOV-96 16:57:01 Page 002 MEASURED INTERVAL VERTICAL DEPTH DEPTH FT FT FT 2891.4 94.30 2632.70 2986.7 95.30 2714 . 08 3080.8 94.10 2794.77 3175.2 94.40 2875. 98 3270.2 95.00 2957.87 Minimum Curvature Method TARGET SECTION FT 979.06 1028.66 1077.06 1125.19 1173.34 STATION AZIMUTH LATITUDE DEPARTURE DISPLA- at AZIMUTH DLS INCLN. N/-S E/-W CEMENT DEG DEG FT FT FT DEG D/HF 31.54 10.8 928.04 344.89 990.06 20.39 0.78 31.19 11.5 976.71 354.48 1039.05 19.95 0.53 30.72 11.3 1024.15 364.05 1086.93 19.57 0.51 30.60 10.8 1071.40 373.28 1134.56 19.21 0.30 30.31 11.7 1118.63 382.67 1182.27 18.89 0.57 3365.1 94.90 3039.90 3459.9 94.80 3121.42 3554.6 94.70 3202.34 3647.6 93.00 3281.99 3743.0 95.40 3363.94 1221.05 1269.45 1318.64 1366.64 1415.47 30.06 11.1 1165.41 392.06 1229.59 18.59 0.45 31.34 11.1 1212.91 401.34 1277.58 18.31 1.35 31.25 11.3 1261.16 410.89 1326.41 18.05 0.15 30.91 11.2 1308.25 420.26 1374.09 17.81 0.37 30.66 11.5 1356.12 429.87 1422.62 17.59 0.31 3840.2 97.20 3447.78 3926.3 86.10 3521.82 4053.9 127.60 3631.48 4149.0 95.10 3713.70 4244.7 95.70 3796.59 1464.65 1508.60 1573.82 1621.58 1669.41 30.14 10.8 1404.38 439.38 1471.51 17.37 0.65 31.25 12.3 1447.43 448.19 1515.24 17.20 1.57 30.26 9.4 1511.50 460.49 1580.09 16.94 1.40 30.07 10.9 1558.53 468.91 1627.54 16.74 0.82 29.91 10.5 1605.54 477.79 1675.12 16.57 0.27 4335.0 90.30 3874.65 4429.2 94.20 3955.34 4524.7 95.50 4036.32 4616.2 91.50 4113.51 4708.1 91.90 4190.64 1714.79 1763.35 1813.84 1862.92 1912.86 30.44 1t.1 1650.12 486.30 1720.28 16.42 0.68 31.70 8.1 1698.04 494.38 1768.55 16.23 2.12 32.31 7.6 1748.18 501.29 1818.64 16.00 0.70 32.66 10.9 1796.67 509.20 1867.43 15.82 1.97 33.21 9.5 1845.84 518.04 1917.16 15.68 1.02 4802.9 94.80 4270.33 4898.6 95.70 4351.37 4992.4 93.80 4431.28 5085.8 93.40 4511.12 5182.5 96.70 4593.92 1964.20 2015.11 2064.21 2112.68 2162.59 32.40 11.8 1896.31 527.52 1968.32 15.55 1.57 31.87 12.2 1946.10 538.10 2019.13 15.46 0.60 31.27 12.1 1994.11 548.44 2068.15 15.38 0.64 31.27 10.0 2041.69 557.73 2116.49 15.28 1.17 30.92 9.3 2090.92 566.10 2166.20 15.15 0.52 5274.8 92.30 4673.17 5369.7 94.90 4754.52 5464.3 94.60 4835.33 5558.7 94.40 4916.41 5651.9 93.20 4997.40 2209.88 2258.75 2307.91 2356.25 2402.33 30.76 11.1 2137.48 574.48 2213.34 15.04 1.01 31.25 14.0 2185.19 585.11 2262.16 14.99 1.66 31.40 12.2 2233.08 596.25 2311.31 14.95 1.00 30.21 13.0 2280.26 606.79 2359.62 14.90 1.33 29.11 15.0 2325.02 617.89 2405.72 14.88 1.55 5733.0 81.10 5068.26 5841.8 108.80 5163.69 5935.7 93.90 5246.74 6029.5 93.80 5330.19 6123.4 93.90 5413.76 2441.76 2494.00 2537.82 2580.63 2623.46 29.12 12.6 2363.34 627.27 2445.17 14.86 1.38 28.27 12.0 2414.38 638.40 2497.36 14.81 0.82 27.37 13.4 2457.13 648.03 2541.15 14.77 1.18 26.96 12.1 2498.90 657.48 2583.94 14.74 0.77 27.31 11.8 2540.79 666.35 2626.72 14.70 0.40 6219.6 96.20 5499.12 6313.9 94.30 5582.47 6408.8 94.90 5665.60 6501.6 92.80 5746.00 6596.9 95.30 5827.87 2667.82 2711.91 2757.67 2804.02 2852.79 27.62 13.8 2584.05 676.18 2671.06 14.66 1.01 28.16 11.8 2627.06 685.95 2715.14 14.63 1.15 29.50 11.4 2671.89 695.15 2760.84 14.58 1.43 30.42 11.3 2717.33 704.27 2807.11 14.53 0.99 31.16 10.8 2765.21 713.61 2855.80 14.47 0.82 6693.0 96.10 5909.64 6787 . 9 94 . 90 5989 . 75 6884 . 4 96.50 6071 . 12 6976.1 91.70 6148.33 7069.0 92.90 6226.16 2903.27 2954.14 3006.01 3055.47 3106.20 32.22 12.0 2814.69 723.60 2906.21 14.42 1.28 32.62 13.5 2864.31 734.83 2957.07 14.39 0.95 32.42 1t.1 2914.99 745.88 3008.90 14.35 1.35 32.87 11.7 2963.48 755.66 3058.30 14.31 0.60 33.34 14.0 3012.94 766.95 3109.02 14.28 1.~4 Schlumberger ANADRILL Survey Report 29-NOV-96 16:57:01 Page 003 Minimum Curvature Method MEASURED INTERVAL VERTICAL TARGET STATION AZIMUTH LATITUDE DEPARTURE DISPLA- at AZIMUTH DLS DEPTH DEPTH SECTION INCLN. N/-S E/-W CEMENT FT FT FT FT DEG DEG FT FT FT DEG D/HF 7163.3 94.30 6304.70 3158.36 33.86 13.0 3063.68 779.13 3161.20 14.27 0.81 7258.8 95.50 6384.09 3211.42 33.68 13.7 3115.33 791.39 3214.27 14.25 0.45 7352.5 93.70 6462.59 3262.57 32.51 12.5 3165.15 802.99 3265.42 14.24 1.43 7444.0 91.50 6540.07 3311.24 31.76 12.7 3212.65 813.61 3314.07 14.21 0.83 7537.1 93.10 6619.52 3359.76 31.08 12.5 3260.02 824.19 3362.59 14.!9 0.74 7632.9 95.80 6701.75 3408.90 30.65 7726.7 93.80 6782.28 3456.97 31.05 7822.9 96.20 6864.33 3507.15 31.88 7919.0 96.10 6945.84 3558.01 32.09 8014.2 95.20 7026.56 3608.42 31.94 13.7 3307.88 835.33 3411.72 14.17 0.78 13.6 3354.62 846.68 3459.82 14.17 0.43 14.2 3403.37 858.75 3510.03 14.16 0.92 14.3 3452.70 871.28 3560.94 14.16 0.23 15.0 3501.53 884.04 3611.41 14.17 0.42 8108.6 94.40 7106.81 3658.06 31.63 8203.9 95.30 7188.05 3707.76 31.40 8300.9 97.00 7271.06 3757.82 30.91 8317.2 16.30 7285.06 3766.15 30.68 Projected to TD 8407.1 89.90 7362.38 3811.92 30.68 15.3 3549.53 897.03 3661.12 14.18 0.37 16.2 3597.47 910.55 3710.92 14.20 0.55 15.4 3645.76 924.22 3761.08 14.23 0.66 15.7 3653.80 926.46 3769.42 14.23 1.70 15.8 3697.96 938.87 3815.28 14.25 0.00 SP_ERRY-SUN DRILLING SERVICES kNCHORAGE ALASKA PAGE BP EXPLOP~ATION (ALASKA) MILNE POINT / MPE-16i 500292268600 NORTH SLOPE BOROUGH COMPUTATION DATE: 2/ 4/97 DATE OF SURVEY: 113096 MAGNETIC MULTI-SHOT SURVEY JOB NUMBER: AK-EI-60185 KELLY BUSHING ELEV. = 54.00 FT. OPERATOR: BP EXPLORATION TRUE SUB-SEA MEASD VERTICAL VERTICAL DEPTH DEPTH DEPTH COURS INCLN DGMN COURSE DLS TOTAL DIRECTION RECTANGULAR COORDINATES DEGREES DG/100 NORTH/SOUTH EAST/WEST VERT. SECT. 3926.31 3521.83 3467.83 31 15 4006.22 3590.18 3536.18 31 9 4098.12 3669.19 3615.19 30 15 4187.20 3746.27 3692.27 29 55 4282.28 3828.60 3774.60 30 5 N 12.34 E .00 1447.39N 448.30E N 11.93 E .29 1487.87N 457.00E N 11.22 E 1.06 1533.84N 466.42E N 10.61 E .51 1577.69N 474.88E N 10.38 E .22 1624.44N 483.54E 1508.58 1549.98 1596.90 1641.55 1689.09 4376.08 3909.14 3855.14 31 34 4471.00 3989.72 3935.72 32 13 4563.38 4067.71 4013.71 32 36 4655.11 4144.83 4090.83 32 57 4749.90 4224.12 4170.12 33 29 N 9.56 E 1.63 1671.79N 491.85E N 8.79 E .81 1721.30N 499.85E N 8.81 E .41 1770.24N 507.43E N 10.40 E 1.01 1819.20N 515.71E N 9.93 E .62 1870.33N 524.88E 1737.14 1787.24 1836.69 1886.31 1938.23 4844.20 4303.40 4249.40 32 3 4939.06 4383.87 4329.87 31 52 5033.15 4463.93 4409.93 31 30 5128.49 4545.21 4491.21 31 30 5220.98 4624.35 4570.35 30 49 N 11.63 E 1.80 1920.47N 534.41E N 11.61 E .20 1969.67N 544.53E N 11.34 E .42 2018.11N 554.37E N 10.82 E .28 2067.01N 563.94E N 8.81 E 1.35 2114.17N 572.10E 1989.26 2039.49 2088.92 2138.74 2186.57 5315.31 4705.23 4651.23 31 7 5410.82 4786.78 4732.78 31 37 5504.22 4866.49 4812.49 31 12 5598.36 4947.64 4893.64 29 40 5693.73 5030.70 4976.70 29 10 N 11.31 E 1.40 2161.95N 580.59E N 12.93 E 1.02 2210.56N 591.03E N 13.40 E .51 2257.97N 602.12E N 14.36 E 1.71 2304.27N 613.55E N 13.53 E .68 2349.75N 624.84E 2235.08 2284.80 2333.47 2381.14 2427.96 5787.66 5112.80 5058.80 28 58 5882.11 5195.73 5141.73 28 12 5975.86 5278.68 5224.68 27 19 6071.24 5363.54 5309.54 27 0 6166.71 5448.22 5394.22 27 59 N 12.54 E .56 2394.22N 635.14E N 13.02 E .84 2438.29N 645.13E N 12.94 E .94 2480.85N 654.94E N 11.21 E .89 2523.43N 664.05E N 12.96 E 1.33 2566.52N 673.29E 2473.59 2518.78 2562.45 2605.99 2650.06 6261.32 5531.83 5477.83 27 49 6355.42 5614.54 5560.54 29 7 6448.90 5695.78 5641.78 30 10 6544.01 5777.71 5723.71 30 51 6639.60 5859.39 5805.39 31 42 N 11.47 E .75 2609.80N 682.66E N 11.31 E 1.37 2653.78N 691.52E N 10.73 E 1.17 2699.17N 700.35E N 10.63 E .72 2746.63N 709.30E N 11.05 E .92 2795.38N 718.64E 2694.34 2739.20 2785.44 2833.73 2883.36 6734.70 5939.81 5885.81 6830.30 6020.21 5966.21 6922.28 6097.67 6043.67 7016.18 6176.38 6122.38 7109.82 6254.42 6200.42 32 48 32 41 32 34 33 31 33 34 N 12.37 E 1.37 2845.09N 728.95E N 12.24 E .15 2895.62N 739.98E N 11.44 E .48 2944.16N 750.15E N 12.48 E 1.17 2994.25N 760.77E N 12.42 E .08 3044.78N 771.93E 2934.12 2985.84 3035.44 3086.64 3138.38 SF 'RY-SUN DRILLING SERVICES ANCHORAGE ALASKA PAGE 2 BP EXPLOP~ATION (ALASKA) MILNE POINT / MPE-16i 500292268600 NORTH SLOPE BOROUGH COMPUTATION DATE: 2/ 4/97 DATE OF SURVEY: 113096 MAGNETIC MULTI-SHOT SURVEY JOB NUMBER: AK-EI-60185 KELLY BUSHING ELEV. = 54.00 OPERATOR: BP EXPLORATION FT. TRUE SUB-SEA MEASD VERTICAL VERTICAL DEPTH DEPTH DEPTH COURS INCLN DG MN COURSE DLS TOTAL DIRECTION RECTANGULAR COORDINATES DEGREES DG/100 NORTH/SOUTH EAST/WEST VERT. SECT. 7204.46 6332.91 6278.91 34 21 N 12.43 E .82 3096.41N 783.30E 7296.24 6409.05 6355.05 33 30 N 13.20 E 1.03 3146.37N 794.66E 7390.13 6487.94 6433.94 32 9 N 11.84 E 1.65 3196.06N 805.71E 7484.13 6567.77 6513.77 31 35 N 12.60 E .74 3244.57N 816.21E 7579.18 6649.17 6595.17 30 35 N 13.29 E 1.12 3292.39N 827.20E 3191.25 3242.48 3293.38 3343.00 3392.07 7674.25 6731.09 6677.09 30 23 N 13.52 E .23 3339.32N 838.38E 7769.63 6812.72 6758.72 31 52 N 14.23 E 1.59 3387.18N 850.21E 7864.82 6893.45 6839.45 32 8 N 14.04 E .30 3436.10N 862.53E 7914.00 6935.07 6881.07 32 14 N 14.01 E .20 3461.52N 868.88E 7960.28 6974.24 6920.24 32 6 N 14.19 E .34 3485.42N 874.88E 3440.29 3489.57 3539.97 3566.15 3590.77 8054.90 7054.38 7000.38 32 7 N 14.38 E .11 3534.17N 887.29E 8149.83 7134.99 7080.99 31 38 N 14.56 E .52 3582.72N 899.81E 8199.89 7177.66 7123.66 31 25 N 15.31 E .90 3608.01N 906.56E 8260.37 7229.40 7175.40 30 58 N 15.66 E .80 3638.20N 914.92E 8407.00 7355.13 7301.13 30 58 N 15.66 E .00 3710.85N 935.29E 3641.03 3691.12 3717.26 3748.52 3823.80 THE CALCULATION PROCEDURES ARE BASED ON THE USE OF THREE-DIMENSION MINIMUM CURVATURE METHOD. HORIZONTAL DISPLACEMENT = 3826.90 FEET AT NORTH 14 DEG. 8 MIN. EAST AT MD = 8407 VERTICAL SECTION RELATIVE TO WELL HEAD VERTICAL SECTION COMPUTED ALONG 11.84 DEG. TIE-IN SURVEY AT 3926.31' MD PROJECTED SURVEY AT 8407.00' MD SP-~RRY-SUN DRILLING SERVICES ANCHORAGE ALASKA PAGE 3 BP EXPLORATION (ALASKA) MILNE POINT / MPE-16i 500292268600 NORTH SLOPE BOROUGH COMPUTATION DATE: 2/ 4/97 DATE OF SURVEY: 113096 JOB NUMBER: AK-EI-60185 KELLY BUSHING ELEV. = 54.00 FT. OPERATOR: BP EXPLORATION INTERPOLATED VALUES FOR EVEN 1000 FEET OF MEASURED DEPTH TRUE SUB-SEA MEASD VERTICAL VERTICAL DEPTH DEPTH DEPTH TOTAL RECTANGULAR COORDINATES NORTH/SOUTH EAST/WEST MD-TVD VERTICAL DIFFERENCE CORRECTION 3926.31 3521.83 3467.83 4926.31 4373.05 4319.05 5926.31 5234.68 5180.68 6926.31 6101.07 6047.07 7926.31 6945.48 6891.48 1447.39 N 448.30 E 1963.07 N 543.17 E 2458.65 N 649.84 E 2946.29 N 750.58 E 3467.89 N 870.47 E 404.48 553.26 148.78 691.63 138.37 825.24 133.61 980.83 155.58 8407.00 7355.13 7301.13 3710.85 N 935.29 E 1051.87 71.04 THE CALCULATION PROCEDURES ARE BASED ON THE USE OF THREE-DIMENSION MINIMUM CURVATURE METHOD. SP~-RRY-SUN DRILLING SERVICES ANCHORAGE ALASKA PAGE 4 BP EXPLOtLATION (ALASKA) MILNE POINT / MPE-16i 500292268600 NORTH SLOPE BOROUGH COMPUTATION DATE: 2/ 4/97 DATE OF SURVEY: 113096 JOB NUMBER: AK-EI-60185 KELLY BUSHING ELEV. = 54.00 FT. OPERATOR: BP EXPLORATION INTERPOLATED VALUES FOR EVEN 100 FEET OF SUB-SEA DEPTH TRUE SUB-SEA MEASD VERTICAL VERTICAL DEPTH DEPTH DEPTH TOTAL RECTANGULAR COORDINATES NORTH/SOUTH EAST/WEST MD-TVD VERTICAL DIFFERENCE CORRECTION 3926.31 3521.83 3467.83 3963.94 3554.00 3500.00 4080.53 3654.00 3600.00 4196.12 3754.00 3700.00 1447.39 N 448.30 1466.46 N 452.47 1525.15 N 464.70 1582.06 N 475.70 E 404.48 E 409.94 5.46 E 426.53 16.60 E 442 . 12 15 . 59 4311.63 3854.00 3800.00 4428.77 3954.00 3900.00 4547.11 4054.00 4000'.00 4666.04 4154.00 4100.00 4785.73 4254.00 4200.00 1638.92 N 486.19 1699.05 N 496.41 1761.58 N 506.08 1825.05 N 516.78 1889.80 N 528.29 E 457.63 15.51 E 474.77 17.14 E 493.11 18.33 E 512.04 18.93 E 531.73 19.69 4903.88 4354.00 4300.00 5021.50 4454.00 4400.00 5138.79 4554.00 4500.00 5255.50 4654.00 4600.00 5372.33 4754.00 4700.00 1951.47 N 540.79 2012.14 N 553.17 2072.30 N 564.95 2131.65 N 574.81 2190.89 N 586.52 E 549.88 18.15 E 567.50 17.62 E 584.79 17.29 E 601.50 16.71 E 618.33 16.83 5489.62 4854.00 4800.00 5605.68 4954.00 4900.00 5720.41 5054.00 5000.00 5834.72 5154.00 5100.00 5948.08 5254.00 5200.00 2250.61 N 600.36 2307.79 N 614.45 2362.40 N 627.89 2416.41 N 640.09 2468.42 N 652.08 E 635.62 17.29 E 651.68 16.06 E 666.41 14.73 E 680 . 72 14 . 31 E 694.08 13.36 6060.53 5354.00 5300.00 6173.25 5454.00 5400.00 6286.39 5554.00 5500.00 6400.62 5654.00 5600.00 6516.39 5754.00 5700.00 2518.66 N 663.10 2569.51 N 673.98 2621.27 N 684.99 2675.40 N 695.82 2732.70 N 706.69 E 706.53 12.45 E 719.25 12.72 E 732.39 13.14 E 746.62 14.23 E 762.39 15.77 6633.26 5854.00 5800.00 6751.59 5954.00 5900.00 6870.45 6054.00 6000.00 6989.34 6154.00 6100.00 7109.32 6254.00 6200.00 2792.11 N 718.00 2854.02 N 730.91 2916.81 N 744.56 2979.78 N 757.57 3044.50 N 771.87 E 779.26 16.87 E 797.59 18.33 E 816.45 18.86 E 835.34 18.89 E 855.32 19.98 7230.01 6354.00 6300.00 7350.04 6454.00 6400.00 7467.97 6554.00 6500.00 7584.79 6654.00 6600.00 7700.81 6754.00 6700.00 3110.49 N 786.41 3175.18 N 801.33 3236.30 N 814.36 3295.17 N 827.85 3352.38 N 841.52 E 876.01 20.69 E 896.04 20.03 E 913.97 17.92 E 930.79 16.83 E 946.81 16.02 7818.25 6854.00 6800.00 3412.09 N 856.52 E 964.25 17.44 SpRRRY-SUN DRILLING SERVICES ANCHORAGE AJ_J~S KA PAGE BP EXPLORATION (ALASKA) MILNE POINT / MPE-16i 500292268600 NORTH SLOPE BOROUGH COMPUTATION DATE: 2/ 4/97 DATE OF SURVEY: 113096 JOB NUMBER: AK-EI-60185 KELLY BUSHING ELEV. = 54.00 FT. OPERATOR: BP EXPLORATION INTERPOLATED VALUES FOR EVEN 100 FEET OF SUB-SEA DEPTH TRUE SUB-SEA MEASD VERTICAL VERTICAL DEPTH DEPTH DEPTH TOTAL RECTANGULAR COORDINATES NORTH/SOUTH EAST/WEST MD-TV]D VERTICAL DIFFERENCE CORRECTION 7936.37 6954.00 6900.00 3473.09 N 871.77 E ' 982.37 18.12 8054.45 7054.00 7000.00 3533.94 N 887.23 E 1000.45 18.08 8172.15 7154.00 7100.00 3594.03 N 902.78 E 1018.15 17.70 8289.06 7254.00 7200.00 3652.41 N 918.91 E 1035.06 16.91 8405.68 7354.00 7300.00 3710.19 N 935.11 E 1051.68 16.62 8407.00 7355.13 7301.13 3710.85 N 935.29 E 1051.87 .19 THE CALCULATION PROCEDURES USE A LINEAR INTERPOLATION BETWEEN THE NEAREST 20 FOOT MD (FROM MINIMUM CURVATURE) POINTS TIE-IN SURVEY AT 3926.31' MD PROJECTED SURVEY TO TD AT 8407.00' MD gyro/data M Ci OFILMJ D B.P. EXPLORATION WELL NO' MPE-~/~ IVllLNE PT. FIELD, ALASKA Gyro Multishot Survey Of 7" casing Survey date · 23 December 1998 Job number' AK1296C376 SR376.DOC Gyrodata Incorporated P.O. Box 79389 Houston, Texas 77279 713/461-3146 Fax: 713/461-0920 January 7, 1997 B.P. Exploraton (Alaska) Inc. Petrotechnical Data Center, MB 3-3 900 E. Benson Blvd. Anchorage, AK 99519-6612 Re: E-Pad, Well No: MP~, Milne Point Field, AK Enclosed please find one (1) original and six (6) copies and one (1) disk of the completed survey ofWell #MP~ We xvould like to take this opportunity to thank you for using Gyrodata and we look forward to serving you in the future. Asst. erations Manager JEM/fec Serving the Worldwide Energy Industry with Precision Survey Instrumentation gyro/data CONTENTS JOB NUMBER :AK1296C376 1. DISCUSSION , SURVEY CERTIFICATION SHEET 2. SURVEY DETAILS 3. OUTRUN SURVEY LISTING 4. QUALITY CONTROL EQUIPMENT AND CHRONOLOGICAL REPORT SR376.DOC gyro/data t. DISCUSSION , SURVEY CERTIFICATION SHEET SR376.DOC gyro/data DISCUSSION JOB NUMBER' AK1296C376 Tool 758 was run in well# MPF;:,'t<T on SCHLUMBERGER 15/32" Wireline inside casing. The survey was run without problems. SR376.DOC gyro/data SURVEY CERTIFICATION SHEET JOB NUMBER: AK1296C376 The data for this survey and the calculations for this survey were obtained and performed by me according to standards and procedures as set forth by Gyrodata Limited, true and correct to the best of my knowledge. TOM STODDARD OPERATIONS ENGINEER The data and calculations for this survey have been checked by me and conform to the standards and procedures as set forth by Gyrodata Limited. This report represents a directional survey of this well based on the original data obtained at the wellsite. Checked by :- ROB SHOUP OPERATIONS MANAGER SR376.DOC gyro/data 2. SURVEY DETAILS SR376.DOC gyro/data SURVEY DETAILS JOB NUMBER: AK1296C376 CLIENT: B.P. EXPLORATION RIG: SCHLUMBERGER CRANE LOCATION: WELL: MILNE POINT FIELD MP~ LATITUDE: 70.420000 N LONGITUDE: 149.50W SURVEY DATE: 23 DECEMBER 1996 SURVEY TYPE : MULTISHOT IN 7" CASING DEPTH REFERENCE: MAX. SURVEY DEPTH: ROTARY TABLE ELEVATION 54 FT. 8251 SURVEY TIED ONTO: NA SURVEY INTERVAL: 100' FROM 0 -1100' 50' FROM 1100-8251' UTM CO-ORDINATES: TARGET DIRECTION: 14.86 GRID CORRECTION: N/A CALCULATION METHOD: MINIMUM CURVATURE S U RVEYO R: TOM STODDARD SR376.DOC gyro/data 3, OUTRUN SURVEY LISTING SR376.DOC A Gyroda t a D i re c t i ona i Survey for B.P. EXPLORATION WELL: MPE-16, 7" Location: E PAD, MILNE POINT, ALASKA Job Number: AK1296C376 Run Date: 23-Dec-96 18:15:00 Surveyor: TOM STODDARD Calculation Method: MINIMUM CURVATURE Survey Latitude: 70.450000 deg. N Sub-sea Correction from Vertical Reference: 54 ft. Azimuth Correction: Gyro: Bearings are Relative to True North Proposed Well Direction: 11.840 deg Vertical Section Calculated from Well Head Location Closure Calculated from Well Head Location Horizontal Coordinates Calculated from Local Horizontal Reference A Gyro da t a D i r e c t i ona i Survey B.P. EXPLORATION WELL: MPE-16, 7" Location: E PAD, MILNE POINT, Job Number: AK1296C376 ALASKA Page MEASURED DEPTH feet I N C L AZIMUTH VERTICAL DEPTH deg. deg. feet VERTICAL SECTION feet SUBSEA DEPTH feet DOGLEG CLOSURE SEVERITY DIST. AZIMUTH deg./ feet deg. 100 ft. HORIZONTAL COORDINATES feet 0.0 100.0 200.0 301.0 401.0 0.00 0.00 0 .58 340.37 100 .62 342.48 200 .91 8.76 301 2.73 28.47 400 .0 .0 .0 .0 .9 0.0 .4 1.3 2.6 5.7 -54.0 0.00 0.0 0.0 46.0 .58 .5 340.4 146.0 .04 1.5 341.1 247.0 .45 2.8 348.9 346.9 1.90 5.7 7.2 0.00 N 0.00 E .48 N .17 W 1.47 N .50 ~ 2.78 N .54 W 5.66 N .71 E 501.0 600.0 700.0 801.0 900.0 3.92 32.59 500 4.82 35.43 599 6.87 32.86 698 9.01 37.21 799 11.29 30.84 896 .8 .5 .9 .0 .4 11.2 18.1 27.6 40.4 56.5 446.8 545.5 644.9 745.0 842.4 1.21 11.3 19.1 .94 18.6 25.2 2.07 28.7 28.2 2.20 42.6 30.6 2.56 60.0 31.5 10.63 N 3.69 E 16.86 N 7.92 E 25.31 N 13.60 E 36.69 N 21.66 E 51.19 N 31.32 E 1001.0 1100.0 1150.0 1200.0 1250.0 13.02 29.62 995 16.50 37.94 1090 18.54 38.37 1138 21.10 40.67 1185 23.08 42.39 1231 .2 .9 .6 .6 .9 76.7 100.0 113.5 128.5 144.8 941.2 1036.9 1084.6 1131.6 1177.9 1.73 81.3 31.1 4.11 106.4 31.9 4.09 121.4 32.6 5.35 138.2 33.5 4.16 156.8 34.5 69.57 N 42.01 E 90.36 N 56.17 E 102.19 N 65.47 E 115.26 N 76.28 E 129.32 N 88.75 E 1300.0 1350 . 0 1400.0 1450.0 1500.0 25.33 43.54 1277 27.14 43.17 1322 28.15 42.11 1366 28.61 40.75 1410 29.27 37.69 1454 .5 .4 .7 .7 .4 162.3 181.2 201.1 221.8 243.2 1223.5 1268.4 1312.7 1356.7 1400.4 4.60 177.1 35.4 3.65 199.1 36.3 2.23 222.1 37.0 1.59 245.8 37.4 3.24 270.0 37.6 144.31 N 102.73 E 160.38 N 117.90 E 177.45 N 133.61 E 195.27 N 149.33 E 214.01 N 164.62 E 1550.0 1600.0 1650.0 1700.0 1750.0 29.93 35.36 1497. 31.20 32.07 1541. 31.90 28.89 1583. 32.59 23.91 1625. 33.17 21.38 1667. 265.7 289.3 314.0 339.8 366.5 1443.9 1487.0 1529.6 1571.9 1613.9 2.66 294.7 37.5 4.19 320.0 37.2 3.62 346.0 36.7 5.49 372.3 35.9 2.98 398.8 35.0 233.85 N 179.31 E 255.00 N 193.41 E 277.54 N 206.67 E 301.42 N 218.51 E 326.47 N 228.95 E A Gyrodat a D i re c t i ona i Survey B.P. EXPLORATION WELL: MPE-16, 7" Location: E PAD, MILNE POINT, Job Number: AK1296C376 ALASKA Page MEASURED DEPTH feet I N C L AZIMUTH VERTICAL DEPTH deg. deg. feet VERTICAL SECTION feet SUBSEA DEPTH feet DOGLEG CLOSURE SEVERITY DIST. AZIMUTH deg./ feet deg. 100 ft. HORIZONTAL COORDINATES feet 1800.0 1850.0 1900.0 1950.0 2000.0 33.32 19.11 1709.7 32.81 17.65 1751.6 32.40 16.89 1793.7 32.41 13.71 1835.9 32.42 12.70 1878.1 393 .6 420.7 447.5 474.3 501.1 1655.7 2.51 425.3 34.1 1697.6 1.88 451.6 33.2 1739.7 1.16 477.6 32.3 1781.9 3.41 503.3 31.4 1824.1 1.08 528.8 30.5 352.18 N 238.43 E 378.07 N 247.04 F 403.80 N 255.04 E 429.64 N 262.10 E 455.73 N 268.23 E 2050.0 2100.0 2150.0 2201.0 2251.0 32.04 12.72 1920.4 31.92 12.69 1962.8 31.91 12.80 2005.3 32.02 12.27 2048.5 32.54 10.69 2090.8 527.7 554.2 580.6 607.6 634.3 1866.4 1908.8 1951.3 1994.5 2036.8 .76 554.3 29.6 .23 579.6 28.9 .11 605.1 28.2 .59 631.1 27.5 1.99 656.8 26.9 481.74 N 274.09 E 507.57 N 279.92 E 533.36 N 285.75 E 559.71 N 291.61 E 585.88 N 296.92 E 2301.0 2351.0 2401.0 2451.0 2501.0 32.46 10.34 2133.0 32.27 10.49 2175.2 32.16 10.69 2217.5 32.06 10.63 2259.9 31.74 10.87 2302.3 661.2 688.0 714.6 741.2 767.6 2079.0 2121.2 2163.5 2205.9 2248.3 .41 682.6 26.2 .40 708.4 25.6 .32 734.2 25.1 .21 760.0 24.6 .69 785.6 24.1 612.30 N 301.82 E 638.62 N 306.66 E 664.83 N 311.55 E 690.94 N 316.47 E 716.90 N 321.40 E 2551.0 2601.0 2651.0 2701.0 2751.0 31.58 10.68 2344.9 31.48 10.69 2387.5 31.46 10.79 2430.1 31.27 10.77 2472.8 31.13 10.67 2515.6 793.8 820.0 846.1 872.1 898.0 2290.'9 2333.5 2376.1 2418.8 2461.6 .38 811.2 23.7 .21 836.7 23.3 .11 862.2 22.9 .38 887.7 22.6 .30 913.0 22.2 742.68 N 326.30 E 768.38 N 331.15 E 794.02 N 336.01 E 819.59 N 340.88 E 845.04 N 345.70 E 2801.0 2851.0 2901.0 2951.0 3001.0 31.00 10.64 2558.4 30.99 11.14 2601.3 31.12 12.22 2644.1 31.02 11.94 2686.9 30.90 11.87 2729.8 923.8 949.5 975.3 1001.1 1026.9 2504.4 2547.3 2590.1 2632.9 2675.8 .27 938.3 21.9 .51 963.6 21.6 1.15 989.0 21.4 .35 1014.5 21.1 .26 1039.9 20.9 870.39 N 350.47 E 895.68 N 355.33 E 920.94 N 360.56 E 946.17 N 365.96 E 971.35 N 371.26 E A Gyro da t a D i r e c t i ona I Survey B.P. EXPLORATION WELL: MPE-16, 7" Location: E PAD, MILNE POINT, Job Number: AK1296C376 ALASKA Page MEASURED I N C L AZIMUTH VERTICAL DEPTH DEPTH feet deg. deg. feet VERTICAL SECTION feet SUBSEA DEPTH feet DOGLEG CLOSURE SEVERITY DIST. AZIMUTH deg./ feet deg. 100 ft. HORIZONTAL COORDINATES feet 3051.0 30.68 11.84 2772.8 3101.0 30.55 12.12 2815.8 3151.0 30.47 11.88 2858.9 3201.0 30.30 11.99 2902.0 3251.0 30.22 11.99 2945.2 1052 1077 1103 1128 1153 .5 .9 .3 .6 .8 2718.8 2761.8 2804.9 2848.0 2891.2 .43 1065.2 20.7 .40 1090.3 20.5 .30 1115.5 20.3 .36 1140.5 20.1 .16 1165.4 19.9 996.40 N 376.52 E 1021.31 N 381.81 E 1046.14 N 387.09 E 1070.88 N 392.32 E 1095.52 N 397.55 E 3301.0 30.04 12.04 2988.4 3351.0 29.87 12.02 3031.8 3401.0 29.64 12.13 3075.2 3451.0 30.49 12.06 3118.4 3501.0 31.23 12.15 3161.4 1178 1203 1228 1253 1279 .9 .9 .7 .7 .4 2934.4 2977.8 3021.2 3064.4 3107.4 .35 1190.3 19.8 .34 1215.0 19.6 .48 1239.6 19.5 1.71 1264.5 19.3 1.48 1289.9 19.2 1120.07 N 402.77 E 1144.49 N 407.98 E 1168.76 N 413.17 E 1193.25 N 418.41 E 1218.33 N 423.79 E 3551.0 31.09 12.40 3204.1 3601.0 30.77 12.33 3247.0 3651.0 30.82 12.24 3290.0 3701.0 30.53 12.11 3333.0 3751.0 30.41 12.02 3376.1 1305 1330 1356 1382 1407 .2 .9 .5 .0 .4 3150.1 3193.0 3236.0 3279.0 3322.1 · 39 1315.6 19.0 · 64 1341.2 18.9 .14 1366.6 18.8 · 60 1391.9 18.7 · 27 1417.1 18.6 1243.62 N 429.29 E 1268.72 N 434.80 E 1293.74 N 440.25 E 1318.67 N 445.63 E 1343.47 N 450.93 E 3801.0 30.02 11.98 3419.3 3851 . 0 30 . 10 12 . 03 3462 . 6 3901 . 0 30 . 24 12 . 40 3505 . 8 3951 . 0 30 . 85 13 . 03 3548 . 8 4001 . 0 30 . 63 13 . 02 3591.8 1432 1457 1482 1508 1533 .6 .6 .7 .2 .7 3365.3 3408.6 3451.8 3494.8 3537.8 .77 1442.1 18.4 .17 1467.0 18.3 .47 1492.0 18.2 1.37 1517.3 18.1 .44 1542.8 18.1 1368.08 N 1392.58 N 1417.14 N 1441.93 N 1466.83 N 456.16 E 461.37 E 466.69 E 472.28 E 478.04 E 4051.0 30.30 12.50 3634.9 4101.0 29.86 11.99 3678.2 4151.0 29.80 11.97 3721.6 4201.0 29.67 11.56 3765.0 4251.0 29.72 11.11 3808.4 1559.1 1584.1 1609.0 1633.8 1658.6 3580.9 3624.2 3667.6 3711.0 3754.4 .85 1568.0 18.0 1.02 1592.9 17.9 .11 1617.7 17.8 .49 1642.4 17.7 .46 1667.0 17.6 1491.56 N 1516.05 N 1540.38 N 1564.65 N 1588.94 N 483.64 E 488.96 E 494.12 E 499.18 E 504.05 E A Gyro da t a D i r e c t i ona i Survey B.P. EXPLORATION WELL: MPE-16, 7" Location: E PAD, MILNE POINT, Job Number: AK1296C376 ALASKA Page MEASURED DEPTH feet I N C L AZIMUTH VERTICAL DEPTH deg. deg. feet VERTICAL SECTION feet SUBSEA DOGLEG CLOSURE DEPTH SEVERITY DIST. AZIMUTH feet deg./ feet deg. 100 ft. H 0 R I Z 0 N T A L COORDINATES feet 4301.0 4351.0 4401.0 4451.0 4501.0 29.59 10.59 3851.9 30.56 10.56 3895.1 31.22 10.22 3938.0 31.68 10.03 3980.7 32.00 9.85 4023.2 1683.3 1708.3 1734.0 1760.1 1786.4 3797.9 .58 1691.5 17.5 3841.1 1.94 1716.4 17.4 3884.0 1.36 1741.9 17.3 3926.7 .95 1767.8 17.2 3969.2 .67 1794.0 17.1 1613.23 N 1637.86 N 1663.11 N 1688.80 N 1714.78 N 508.70 E 513.30 F 517.93 E 522.52 E 527.07 E 4551.0 4601.0 4651.0 4701.0 4751.0 32.11 9.90 4065.5 32.37 9.47 4107.8 32.49 11.07 4150.0 32.86 11.14 4192.1 33.13 10.72 4234.1 1813 1839 1866 1893 1920 .0 .6 .4 .4 .6 4011.5 .22 1820.3 17.0 4053.8 .69 1846.7 16.9 4096.0 1.74 1873.4 16.8 4138.1 .75 1900.2 16.7 4180.1 .71 1927.3 16.6 1740.93 N 1767.22 N 1793.60 N 1820.09 N 1846.82 N 531.62 E 536.10 E 540.88 E 546.08 E 551.25 E 4801.0 4851.0 4901.0 4951.0 5001.0 32.49 11.01 4276.1 31.69 12.69 4318.4 31.66 12.59 4361.0 31.43 12.38 4403.6 31.15 12.07 4446.3 1947 1974 2000 2026 2052 .7 .3 .5 .7 .7 4222.1 1.31 1954.3 16.5 4264.4 2.40 1980.8 16.5 4307.0 .13 2007.0 16.4 4349.6 .50 2033.1 16.4 4392.3 .65 2059.0 16.3 1873.43 N 1899.42 N 1925.04 N 1950.58 N 1975.96 N 556.35 E 561.80 E 567.55 E 573.20 E 578.70 E 5051.0 5101.0 5151.0 5201.0 5251.0 31.22 11.77 4489.1 31.00 11.21 4531.9 31.03 10.79 4574.8 30.77 10.38 4617.7 30.62 10.10 4660.7 2078 2104 2130 2155 2181 .5 .4 .1 .8 .3 4435.1 .34 2084.8 16.3 4477.9 .72 2110.5 16.2 4520.8 .44 2136.2 16.1 4563.7 .67 2161.7 16.1 4606.7 .41 2187.1 16.0 2001.29 N 2026.60 N 2051.89 N 2077.13 N 2102.24 N 584.04 589.19 594.10 598.82 603.35 5301.0 5351.0 5401.0 5451.0 5501.0 30.67 11.75 4703.7 30.84 12.19 4746.7 31.25 13.57 4789.5 31.35 13.44 4832.2 30.85 13.03 4875.0 2206.8 2232.4 2258.1 2284.1 2309.9 4649.7 1.68 2212.5 16.0 4692.7 .57 2238.0 15.9 4735.5 1.65 2263.7 15.9 4778.2 .23 2289.7 15.8 4821.0 1.08 2315.5 15.8 2127.26 N 2152.27 N 2177.40 N 2202.66 N 2227.80 N 608.18 E 613.48 E 619.23 E 625.30 E 631.21 E A Gyro da t a D i r e c t i ona i Survey B.P. EXPLORATION WELL: MPE-16, 7" Location: E PAD, MILNE POINT, Job Number: AK1296C376 ALASKA Page MEASURED DEPTH feet I N C L AZIMUTH VERTICAL DEPTH deg. deg. feet VERTICAL SECTION feet SUBSEA DEPTH feet DOGLEG CLOSURE SEVERITY DIST. AZIMUTH deg./ feet deg. 100 ft. HORIZONTAL COORDINATES feet 5551 5601 5651 5701 5751 .0 30.32 12.97 4918 .0 29.29 15.38 4961 .0 28.87 15.15 5005 .0 28.76 14.23 5049 .0 28.87 13.68 5092 .1 .5 .2 .0 .8 2335.4 2360.2 2384.4 2408.5 2432.6 4864.1 4907.5 4951.2 4995.0 5038.8 1.06 2340.9 15.8 3.17 2365.7 15.8 .87 2390.0 15.8 .91 2414.1 15.8 .57 2438.2 15.7 2252.59 N 636.94 E 2276.69 N 643.01 E 2300.13 N 649.41 E 2323.44 N 655.52 E 2346.82 N 661.33 E 5801 5851 5901 5951 6001 .0 28.51 13.24 5136 .0 28.06 13.17 5180 .0 27.55 12.93 5224 .0 27.14 12.85 5269 .0 26.72 12.69 5313 .6 .7 .9 .3 .9 2456 2480 2503 2526 2549 .6 .3 .6 .5 .2 5082.6 5126.7 5170.9 5215.3 5259.9 .83 2462.2 15.7 .91 2485.9 15.7 1.05 2509.2 15.7 .81 2532.1 15.6 .85 2554.7 15.6 2370.17 N 666.92 E 2393.23 N 672.34 E 2415.95 N 677.60 E 2438.34 N 682.73 E 2460.43 N 687.73 E 6051.0 26.66 12.37 5358 6101.0 26.58 11.84 5403 6151.0 27.59 11.89 5447 6201.0 27.60 12.26 5492 6251.0 27.59 12.26 5536 .6 .3 .8 .1 .4 2571 2594 2616 2640 2663 .6 .0 .8 .0 .1 5304.6 5349.3 5393.8 5438.1 5482.4 .31 2577.2 15.6 .50 2599.5 15.6 2.02 2622.2 15.5 .35 2645.4 15.5 .02 2668.5 15.5 2482.35 N 692.61 E 2504.26 N 697.30 E 2526.54 N 701.98 E 2549.19 N 706.83 E 2571.82 N 711.75 E 6301 6351 6401 6451 6501 .0 27.49 12.23 5580 .0 28.71 11.73 5624 .0 28.98 11.77 5668 .0 29.94 11.35 5712 .0 30.12 11.43 5755 .7 .8 .6 .2 .5 2686 2709 2733 2758 2783 .3 .8 .9 .5 .5 5526.7 5570.8 5614.6 5658.2 5701.5 .21 2691.6 15.4 2.49 2715.1 15.4 .54 2739.2 15.4 1.98 2763.7 15.3 .37 2788.7 15.3 2594.42 N 716.65 E 2617.45 N 721.54 E 2641.07 N 726.45 E 2665.16 N 731.37 E 2689.69 N 736.32 E 6551.0 6601.0 6651.0 6701.0 6751.0 30.53 11.52 5798. 30.90 11.78 5841. 31.47 11.89 5884. 31.99 12.65 5926. 32.50 13.34 5969. 2808.8 2834.3 2860.2 2886.5 2913.2 5744.6 5787.6 5830.4 5872.9 5915.2 .82 2813.8 15.3 .77 2839.3 15.2 1.15 2865.2 15.2 1.31 2891.4 15.2 1.26 2918.1 15.2 2714.44 N 741.34 E 2739.45 N 746.50 E 2764.78 N 751.81 E 2790.48 N 757.40 E 2816.47 N 763.40 E A Gyro da t a D i r e c t i ona i Survey B.P. EXPLORATION WELL: MPE-16, 7" Location: E PAD, MILNE POINT, Job Number: AK1296C376 ALASKA Page MEASURED DEPTH feet I N C L AZIMUTH VERTICAL DEPTH deg. deg. feet vERTICAL SECTION feet SUBSEA DEPTH feet DOGLEG CLOSURE SEVERITY DIST. AZIMUTH deg./ feet deg. 100 ft. HORIZONTAL COORDINATES feet 6801.0 32.51 12.98 6011.4 2'940.0 5957.4 6851.0 32.41 12.63 6053.6 2966.9 5999.6 6901.0 32.46 12.21 6095.8 2993.7 6041.8 6951.0 32.40 12.14 6138.0 3020.5 6084.0 7001.0 32.94 13.50 6180.1 3047.5 6126.1 .38 2944.9 15.1 .42 2971.8 15.1 .47 2998.5 15.1 .13 3025.3 15.1 1.81 3052.3 15.1 2842.63 N 769.51 E 2868.80 N 775.46 F 2894.98 N 781.23 E 2921.19 N 786.88 E 2947.51 N 792.87 E 7051· 7101. 7151· 7201. 7251· 0 33.29 13.45 6221.9 3074.8 6167.9 0 33.36 13.15 6263.7 3102.2 6209.7 0 33.49 13.43 6305.4 3129.8 6251.4 0 33.90 13.08 6347.0 3157.5 6293.0 0 34.02 12.90 6388.5 3185.4 6334.5 .71 3079.6 15.0 .36 3107.1 15.0 .40 3134.6 15.0 .91 3162.3 15.0 .30 3190.2 15.0 2974.07 N 799.24 E 3000.81 N 805.56 E 3027.61 N 811.89 E 3054.61 N 818.25 E 3081.83 N 824.53 E 7301. 7351. 7401. 7451. 7501. 0 33.09 13.55 6430.2 3213.1 6376.2 0 32.82 13.39 6472.1 3240.3 6418.1 0 31.67 12.88 6514.4 3266.9 6460.4 0 31.53 12.86 6557.0 3293.1 6503.0 0 31.55 12.85 6599.6 3319.3 6545.6 2.00 3217.8 15.0 .55 3245.0 15.0 2.37 3271.7 14.9 .27 3297.9 14.9 .03 3324.0 14.9 3108.73 N 830.85 E 3135.18 N 837.19 E 3161.16 N 843.25 E 3186.70 N 849.09 E 3212.20 N 854.91 E 7551. 7601. 7651. 7701. 7751. 0 31.10 13.01 6642.3 3345.3 6588.3 0 30.59 13.45 6685.3 3370.9 6631.3 0 30.56 13.55 6728.3 3396.3 6674.3 0 30.35 14.04 6771.4 3421.6 6717.4 0 31.32 14.51 6814.3 3447.2 6760.3 .91 3350.0 14.9 1.12 3375.6 14.9 .13 3401.0 14.9 .64 3426.4 14.9 2.00 3452.0 14.9 3237.54 N 860.72 E 3262.50 N 866.59 E 3287.22 N 872.52 E 3311.83 N 878.57 E 3336.67 N 884.89 E 7801. 7851. 7901. 7951. 8001. 31.88 14.77 6856.9 3473.4 6802.9 31.99 14.63 6899.4 3499.8 6845.4 31.97 14.84 6941.8 3526.3 6887.8 32.04 14.84 6984.2 3552.7 6930.2 31.93 14.73 7026.6 3579.2 6972.6 1.16 3478.2 14.9 .26 3504.7 14.9 · 22 3531.1 14.8 · 15 3557.6 14.8 · 26 3584 . 1 14 . 8 3362.02 N 891.51 E 3387.60 N 898.22 E 3413.21 N 904.96 E 3438.82 N 911.74 E 3464.43 N 918.50 E A Gyro da t a D i r e c t i ona i Survey B.P. EXPLORATION WELL: MPE-16, 7" Location: E PAD, MILNE Job Number: AK1296C376 POINT, ALASKA Page MEASURED I N C L AZIMUTH VERTICAL DEPTH DEPTH feet deg. deg. feet VERTICAL SECTION feet SUBSEA DOGLEG CLOSURE DEPTH SEVERITY DIST. AZIMUTH feet deg./ feet deg. 100 ft. HORIZONTAL COORDINATES feet 8051.0 31.92 14.91 7069.0 8101.0 31.75 14.91 7111.5 8151.0 31.67 15.10 7154.0 8201.0 31.54 16.04 7196.6 8251.0 31.22 15.51 7239.3 3605.6 3631.9 3658.2 3684.3 3710.3 7015 . 0 . 19 3610 . 6 14 . 8 7057.5 .33 3636.9 14.8 7100.0 .25 3663 . 2 14.9 7142.6 1.01 3689.4 14.9 7185 . 3 . 85 3715 . 4 14 . 9 3489.99 N 3515.47 N 3540.86 N 3566.10 N 3591.16 N 925.26 E 932.05 E 938.86 E 945.89 E 952.97 E Final Station Closure: Distance: 3715.45 ft Az: 14.86 deg. A Gyro da t a D i re c t i ona i Survey for B.P. EXPLORATION WELL: MPE-16, 7" Location: E PAD, MILNE POINT, ALASKA Job Number: AK1296C376SS Run Date: 23-Dec-96 18:15:00 Surveyor: TOM STODDARD Calculation Method: MINIMUM CURVATURE Survey Latitude: 70.450000 deg. N Sub-sea Correction from Vertical Reference: 54 ft. Azimuth Correction: Gyro: Bearings are Relative to True North Proposed Well Direction: 11.840 deg Vertical Section Calculated from Well Head Location Closure Calculated from Well Head Location Horizontal Coordinates Calculated from Local Horizontal Reference A Gyro da t a D i r e c t i ona i Survey B.P. EXPLORATION WELL: MPE-16, 7" Location: E PAD, MILNE POINT, Job Number: AK1296C376SS ALASKA Page SUBSEA I N C L AZIMUTH VERTICAL VERTICAL DEPTH DEPTH SECTION feet deg. deg. feet feet DOGLEG SEVERITY deg./ 100 ft. CLOSURE DIST. AZIMUTH feet deg. H O R I Z O N T A L COORDINATES feet -54.0 0.00 0.00 100.0 .60 341.51 200.0 .77 356.53 300.0 1.88 19.22 400.0 3.36 30.66 0.0 154.0 254.0 354.0 454.0 0.0 .9 2.0 4.2 8.6 0.00 .29 .26 1.22 1.53 0.0 0.0 1.5 340.8 2.8 345.3 5.7 358.6 11.3 13.5 0.00 N 0.00 E 1.01 N .35 W 2.17 N .52 W 4.31 N .63 E 8.30 N 2.29 E 500.0 4.40 34.12 600.0 5.94 34.02 700.0 8.05 35.25 800.0 10.30 33.61 900.0 12.30 30.13 554.0 654.0 754.0 854.0 954.0 14.9 23.3 34.6 49.5 68.3 1.06 1.56 2.14 2.40 2.08 18.6 22.4 28.7 26.8 42.6 29.5 60.0 31.1 81.3 31.3 13.99 N 5.97 E 21.50 N 11.03 E 31.58 N 18.04 E 44.88 N 27.12 E 61.91 N 37.56 E 1000.0 15.16 34.73 1100.0 19.38 39.12 1200.0 24.17 42.95 1300.0 27.86 42.41 1400.0 29.26 37.72 1054.0 1154.0 1254.0 1354.0 1454.0 91.0 118.4 153.3 195.4 243.0 3.19 4.50 4.37 2.64 3.23 106.4 31.6 138.2 32.9 177.1 34.9 222.1 36.8 270.0 37.6 82.35 N 50.72 E 106.48 N 69.02 E 136.58 N 95.52 E 172.57 N 129.12 E 213.83 N 164.48 E 1500.0 31.41 31.10 1600.0 32.98 22.21 1700.0 32.79 17.61 1800.0 32.41 13.28 1900.0 31.95 12.70 1554.0 1654.0 1754.0 1854.0 1954.0 296.8 357.7 422.3 485.8 548.7 4.02 3.81 1.84 2.41 .34 346.0 37.0 398.8 35.3 477.6 33 .1 528.8 31.0 579.6 29.0 261.90 N 318.21 N 379.55 N 440.82 N 502.20 N 197.47 E 225.51 E 247.50 E 264.73 E 278.70 E 2000.0 32.09 12.06 2100.0 32.37 10.41 2200.0 32.07 10.64 2300.0 31.56 10.68 2400.0 31.35 10.78 2054.0 2154 · 0 2254 · 0 2354 · 0 2454.0 611.1 674.5 737.5 799.4 860.6 .77 .41 .23 .34 .26 656.8 27.4 708.4 25.9 760.0 24.7 836.7 23.6 887.7 22.7 563.10 N 625.40 N 687.33 N 748.19 N 808.31 N 292.29 E 304.23 E 315.79 .E 327.34 E 338.74 E A Gyro da t a D i re c t i ona i Survey B.P. EXPLORATION WELL: MPE-16, 7" Location: E PAD, MILNE Job Number: AK1296C376SS POINT, ALASKA Page SUBSEA I N C L AZIMUTH DEPTH feet deg. deg. VERTICAL VERTICAL DOGLEG CLOSURE DEPTH SECTION SEVERITY DIST. AZIMUTH feet feet deg./ feet deg. 100 ft. HORIZONTAL COORDINATES feet 2500.0 31.01 10.64 2600.0 31.10 12.16 2700.0 30.78 11.85 2800.0 30.48 11.91 2900.0 30.18 12.00 2554.0 921.1 .27 938.3 22.0 2654.0 981.3 .96 1014.5 21.3 2754.0 1041.3 .36 1065.2 20.8 2854.0 1100.4 .31 1115.5 20.3 2954.0 1158.9 .20 1190.3 19.9 867.78 N 349.98 E 926.77 N 361.80 E 985.45 N 374.22 E 1043.33 N 386.49 E 1100.52 N 398.61 E 3000.0 29.75 12.07 3100.0 31.11 12.13 3200.0 30.78 12.32 3300.0 30.47 12.07 3400.0 30.09 12.02 3054.0 1216.6 .41 1239.6 19.5 3154.0 1275.0 1.52 1289.9 19.2 3254.0 1335.1 .56 1366.6 18.9 3354.0 1394.4 .44 1417.1 18.6 3454.0 1452.7 .29 1467.0 18.4 1156.93 N 410.64 E 1214.03 N 422.87 E 1272.78 N 435.68 E 1330.76 N 448.21 E 1387.73 N 460.34 E 3500.0 30.83 13.03 3600.0 30.10 12.27 3700.0 29.70 11.67 3800.0 29.64 10.59 3900.0 31.39 10.15 3554.0 1511.2 1.26 1542.8 18.1 3654.0 1570.1 .93 1592.9 17.9 3754.0 1627.5 .39 1642.4 17.7 3854.0 1684.5 .65 1716.4 17.5 3954.0 1743.8 1.21 1767.8 17.3 1444.92 N 472.97 E 1502.36 N 485.99 E 1558.52 N 497.90 E 1614.45 N 508.93 E 1672.73 N 519.65 E 4000.0 32.08 9.89 4100.0 32.52 11.08 4200.0 32.83 10.86 4300.0 31.66 12.60 4400.0 31.16 12.02 4054.0 1805.7 .34 1820.3 17.0 4154.0 1869.0 1.64 1900.2 16.8 4254.0 1933.5 .99 1954.3 16.6 4354.0 1996.2 .50 2007.0 16.4 4454.0 2057.3 .59 2084.8 16.3 1733.81 N 1796.10 N 1859.45 N 1920.83 N 1980.50 N 530.38 E 541.38 E 553.67 E 566.60 E 579.66 E 4500.0 31.01 10.99 4600.0 30.64 10.14 4700.0 30.91 12.43 4800.0 31.10 13.23 4900.0 29.46 14.97 4554.0 2117.6 .58 2136.2 16.2 4654.0 2177.3 .45 2187.1 16.0 4754.0 2236.8 .75 2263.7 15.9 4854.0 2297.2 .66 2315.5 15.8 4954.0 2355.9 2.80 2365.7 15.8 2039.63 N 2098.34 N 2156.57 N 2215.45 N 2272.54 N 591.72 E 602.65 E 614.47 E 628.31 E 641.97 E A Gyro da t a D i r e c t i ona i Survey B.P. EXPLORATION WELL: MPE-16, 7" Location: E PAD, MILNE Job Number: AK1296C376SS POINT, ALASKA Page SUBSEA I N C L AZIMUTH DEPTH feet deg. deg. VERTICAL VERTICAL DOGLEG CLOSURE DEPTH SECTION SEVERITY DIST. AZIMUTH feet feet deg./ feet deg. 100 ft. HORIZONTAL COORDINATES feet 5000.0 28.77 14.17 5100.0 28.33 13.21 5200.0 27.28 12.88 5300.0 26.67 12.40 5400.0 27.59 11.94 5054.0 2411.3 .87 2438.2 15.8 5154.0 2465.9 .86 2485.9 15.7 5254.0 2518.6 .89 2532.1 15.7 5354.0 2569.3 .37 2577.2 15.6 5454.0 2620.1 1.78 2645.4 15.5 2326.12 N 2379.26 N 2430.62 N 2480.11 N 2529.72 N 656.19 E 669.06 E 680.96 E 692.11 E 702.66 E 5500.0 27.55 12.25 5600.0 28.89 11.76 5700.0 30.12 11.43 5800.0 31.06 11.81 5900.0 32.32 13.09 5554.0 2672.3 .10 2691.6 15.5 5654.0 2725.9 1.19 2739.2 15.4 5754.0 2782.7 .42 2788.7 15.3 5854.0 2841.8 .88 2865.2 15.2 5954.0 2903.6 1.28 2918.1 15.2 2580.79 N 2633.17 N 2688.87 N 2746.79 N 2807.13 N 713.69 724.81 736.15 748.04 761.24 6000.0 32.41 12.63 6100.0 32.61 12.66 6200.0 33.35 13.22 6300.0 33.92 13.05 6400.0 32.94 13.46 6054.0 2967.2 .42 2998.5 15.1 6154.0 3030.8 .77 3052.3 15.1 6254.0 3095.9 .44 3107.1 15.0 6354.0 3162.2 .81 3190.2 15.0 6454.0 3228.5 1.18 3245.0 15.0 2869.07 N 2931.22 N 2994.59 N 3059.18 N 3123.75 N 775.52 E 789.17 E 804.09 E 819.31 E 834.45 E 6500.0 31.54 12.86 6600.0 30.96 13.13 6700.0 30.43 13.84 6800.0 31.84 14.76 6900.0 31.99 14.84 6554.0 3291.3 .42 3297.9 14.9 6654.0 3352.2 .96 3375.6 14.9 6754.0 3411.4 .44 3426.4 14.9 6854.0 3471.6 1.22 3478.2 14.9 6954.0 3533.9 .20 3557.6 14.8 3184.90 N 3244.32 N 3301.90 N 3360.28 N 3420.60 N 848.68 E 862.31 E 876.12 E 891.06 E 906.91 E 7000.0 31.92 14.85 7100.0 31.67 15.10 7185.3 31.22 15.51 7054.0 3596.2 .21 3610.6 14.8 7154.0 3658.1 .25 3663.2 14.9 7239.3 3710.3 .85 3715.4 14.9 3480.94 N 3540.84 N 3591.16 N 922.87 938.85 952.97 Final Station Closure: Distance: 3715.45 ft Az: 14.86 deg. gyro/data 4. QUALI'rY CONTROL SR376.DOC gyro/data QUALITY CONTROL REPORT JOB NUMBER: AK1296C376 TOOL NUMBER: 758 MAXIMUM GYRO TEMPERATURE: 79.27C MAXIMUM AMBIENT TEMPERATURE: 80.1C MAXIMUM INCLINATION: 33.49 AVERAGE AZIMUTH: 14.86 WIRELINE REZERO VALUE: REZERO ERROR / K: CALIBRATION USED FOR FIELD SURVEY: 1702 CALIBRATION USED FOR FINAL SURVEY: 1702 PRE JOB MASS BALANCE OFFSET CHECK: .4 POST JOB MASS BALANCE OFFSET CHECK] ' CONDITION OF SHOCK WATCHES .55 USED.5 UPON ARRIVAL AT RIG: OK UPON COMPLETION OF SURVEY: OK UPON RETURN TO ATLAS OK BOTTOM LINE COMPARISIONS M.D. INC AZIMUTH TVD NORTHING EASTING FIELD SURVEY 8251 FINAL SURVEY 8251 31.22 15.51 7239.3 3591.16N 952.97E 31.22 15.51 7239.3 3591.16N 952.97E SR376.DOC gyro/data SR376,DOC gyro/data FUNCTION TEST JOB NUMBER: AK1296C376 5 Survey stations were collected at the measured depth shown below. The tables show the repeatability of the gyro tool in both inclination and azimuth at one measured depth. INCLINATION M.D. ft 1 2 3 4 5 8251 31.22 31.22 31.22 31.22 31.22 AZIMUTH M.D. ft 1 2 3 4 5 8251 15.51 15.51 15.51 15.51 15.51 SR376.DOC gyro/data EQUIPMENT AND CHRONOLOGICAL REPORT SP,376.DOC gyro/data EQUIPMENT REPORT JOB NUMBER :. AK1296C376 DOWNHOLE ELECTRONICS SURFACE ELECTRONICS PRIMARY TOOL No. 758 GYRO SECTION A0147 DATA SECTION C0073 POWER SECTION C0065 BACKUP TOOL No. 706 GYRO SECTION A0004 DATA SECTION C0035 POWER SECTION C0033 COMPUTER POWER SUPPLY PRINTER INTERFACE COMPUTER POWER SUPPLY PRINTER INTERFACE A0222 A0085 A0079 A0035 A0246 A0107 A0029 A0071 WIRELINE COMPANY: CABLE SIZE: SCHLUMBERGER WIRELINE 15/32" RUNNING GEAR 2.5" SYSTEM TOTAL LENGTH OF TOOL: MAXIMUM O.D.: 36 FEET 2.5 INCHES TOTAL WEIGHT OF TOOL: 250 POUNDS SR376.DOC gyro/data CHRONOLOGICAL REPORT JOB NUMBER' AK1296C376 12/23/96 07:00 07:45 10:00 18:15 20:00 21:00 TO LOCATION ARRIVED AT LOCATION MAKE UP TOOL R.I.H.-INRUN SURVEY (CONTINUOUS) COMMENCE OUTRUN LAY DOWN TOOL 12/24/96 10:00 PROCESS SURVEY SR376.DOC 1/23/97 GeoQuest 500 W. International Airport Road Anchorage, AK 99518-1199 ATTN: Sherrie NO. 1O728 Company: Field: Alaska Oil & Gas Cons Comm Attn: Lori Taylor 3001 Porcupine Drive Anchorage, AK 99501 Milne Point (Cased Hole) c~b. O'J-I Well Job # Log Description Date BL RF Sepia LIS Tape MPC-25A JEWELRY LOG-GR/CCL 9 61 2 2 2 I 1 MPC-25A 'INJECTION PROFILE 9 61 2 2 2 I 1 MPC-25A WATER FLOW LOG-TDTP-GR/CCL 9 61 2 2 3 1 1 MPE-16 PERFORATING RECORD 9 61 2 2 9 I 1 MPE-16 PACKER DEPTH DETERMINATION 9 61 2 3 0 I 1 MPE-16 DEPTH CONTROL LOG-GR/CCI. 9 61 2 2 2 I 1 MPE-16 CEMENT BOND LOG 961 222 I 1 MPU Fo77 TUBING PUNCHING RECORD 9 61 21 0 I 1 MPU F-77 GRAVEL PACK LOG 9 61 21 7 I 1 MPU K-13 GR/CCL CORRELATION LOG 9 61 2 0 8 I 1 MPU K-13 PERFORATING RECORD 9 61 2 0 8 I 1 MPU K-13 STATIC PRESSURE/TEMP LOG 9 61 2 0 9 I 1 MPU K-13 PACKER SETTING RECORD 9 61 2 0 9 I 1 MPU K-17 SUMP PACKER SETTING RECORD 961 21 3 I ' 1 MPU K-17 PERFORATION RECORD 9 61 21 3 I 1 MPK-38 PERFORATION RECORD 9 61 2 01 I 1 MPK-38 PACKER SET RECORD 9 61 2 01 I 1 MPK~38 PERF RECORD 961 204 I I c~ (.,,, OBO PLEASE ACKNOWLEDGE RECEIPT BY SIGNING AND RETURNING ONE COPY EACH TO: BP Exploration (Alaska)Inc. Petrotectnical Data Center MB3-3 900 E. Benson Blvd. Anchorage, Alaska 99519-6612 Date Delivered: Schlumberger GeoQuest 500 W. International Airport Road Anchorage, Alaska 99618-1199 Received by~(~l~~/~ Schlumberger - GeoQuest A Division of Schlumberger Technologies Corporation 500 W. International Airport Road Anchorage, Alaska 99518 - 1199 (907) 562-7669 (Bus.) (907) 563-3309 (Fax) January 10, 1997 TO: BP Exploration (Alaska) Inc. Petrotectnical Data Center MB3-3 900 E. Benson Blvd. Anchorage, Alaska 99519-6612 The following data of the MWD Depth Corrected CDR/ADN, CDR/ADN TVD'S for well MPE-16, Job Cf 96378 was sent to: BP Exploration (Alaska) Inc. Petrotechnical Data Center, MB3-3 900 E. Benson Blvd. Anchorage, AK 99519-6612 1 OH LIS Tape 3 Bluelines each 1 Film each 1 Depth Shift Display State of Alaska Alaska Oil & Gas Conservation. Attn: Lori Taylor 3001 Porcupine DriVe Anchorage, AK 99501. _ 1 OH LIS Tape 1 Blueline eaclq I RF Sepia each OXY USA, Inc. Attn' Darlene Fairly P.O. Box 50250 Midland, TX 79710 1 OH LIS Tape 1 Blueline each 1 RF Sepia each Sent Certified Mail: Z 777 937 516 PLEASE ACKNOWLEDGE RECEIPT BY SIGNING AND RETURNING ONE COPY EACH TO: BP Exploration (Alaska)Inc. Petrotectnical Data Center MB3-3 900 E. Benson Blvd. Anchorage, Alaska 99519-6612 Date Delivered: Schlumberger GeoQuest 500 W. International Airport Road Anchorage, Alaska 99618-1199 Received -' _... .~-. __ ~ TONY KNOWLES, GOVERNOR 3001 PORCUPINE OR!yE ANCHORAGE, AU'~ S F,*, PHONE: (907) 279-1433 F.'"X: f907) 276-7542 June 1 '1 1996 Tim Schofield. Senior Drilling EngLneer BP Exploration (Alaska), Inc. ? © Box 196612 Anchorage. AK 99519-6612 Well Name Company Surf Loc Btmhole Loc Milne Point Unit MPE-1 d BP Exploration (Alaska), Inc. 96-!14 3758'NSL. 1849'WEL. Sec. 2f. TlSN. Ri0E. UM 2466'NSL, 860'WEL, Sec. 24. T!SN. R:0E. fz¢i Dear Mr Schofield: Enclosed is the approved application for permit to drill the above referenced well. The permit to drill does not exempt you from obtaining additional permits required by law from other governmental agencies, and does not audmrize conducting drilling operations until all other required permitting determinations are made. The blowout prevention equipment (BOPE) must be tested in accordance with 20 AAC 25.035' and the mechanical inte=m-ity. (Nil) of injection wells must be demonstrated under 20 AAC 25.412 and 25.030(g)(3). Sufficient notice i..appl'oximatelv ' ' .-, hours) of the N'LI test Z .;'1' ? ~ ' before operation, and of the BO?E rest performed before ui,ittng octokv rt~e surGce casing shoe. must be given so that a represe,aradve of ri~e Commission may ',,vimess the rests. Noric~ mav be oiven bv contactina the Commission's .~,'~'~ ....,. -x.;-. - ~ . =. . ~ , .... ,.; ....... :.c.c: :nst~ector on the North '<ioee pager at 659-3607. David W J(Mston__ N ~ Cha~ BY ORDER OF THE COMMISSION dlffencl c: Dept offish & Game, Habitat Sect- w/o encl ~ Dept of Environmental Conservation- w/o encF'~'-- : -- STATE OF ALASKA ALASKA C~,L AND GAS CONSERVATION COMMISSION PERMIT TO DRILL 20 AAC 25.005 [] Drill [] Redrill Ilb. Type of well [] Exploratory [] Stratigraphic Test [] Development Oil la. Type of work [] Re-Entry [] Deepen~ [] Service [] Development Gas [] Single Zone [] Multiple Zone 2. Name of Operator 15. Datum Elevation (DF or KB) 10. Field and Pool BP Exploration (Alaska) Inc. Plan RTE = 57.5' Milne Point Unit / Kuparuk River 3. Address 16. Property Designation Sands P.O. Box 196612, Anchorage, Alaska 99519-6612 ADL 047437 4. Location of well at surface 7. Unit or Property Name 11. Type Bond (See 20 AAC 25.025) 3758' NSL, 1849' WEL, SEC. 25, T13N, R10E Milne Point Unit At top of productive interval 8. Well Number Number 2S100302630-277 2140' NSL, 925' WEL, SEC. 24, T13N, R10E MPE-16 Attotal depth 9. Approximate spud date Amount $200,000.00 2466' NSL, 860' WEL, SEC. 24, T13N, R10E 07/15/96 12. Distance to nearest property line113. Distance to nearest well 14. Number of acres in properly 15. Proposed depth (MD and TVD) ADL 047438, 880'I MPE-07, 28' @ 550' TVD 2560 8555' MD / 7377' TVD 16. To be completed for deviated wells i17. Anticipated pressure {see 20 AAC 25.035 (e)(2)} Kick Off Depth 300' Maximum Hole Angle 33.55° Maximum surface 3005 psig, Attotal depth (TVD) 7529' / 3758 psig 18. Casing Program Specifications Setting Depth Size Top Bottom Quantity of Cement Hole Casing Weight Grade Coupling Length MD TVD MD TVD (include stage data) 30" 20" 91.1# NT80LHE Weld 80 32' 32' 112' 112' 250 sx Arcticset I (Approx.) 12-1/4" 9-5/8" 40# L-80 Btrc 5524' 31' 31' 5555' 4838' 1156 sx PF'E', 403 sx 'G' 8-1/2" 7" 26# L-80 Mod B 8525' 30' 30' 8555' 7337' 124 sx Class 'G' 19. To be completed for Redrill, Re-entry, and Deepen Operations. Present well condition summary Total depth: measured feet Plugs (measured) true vertical feet Effective depth: measured feet Junk (measured) true vertical feet Casing Length Size Cemented M D TVD Structural Conductor Surface Intermediate Production RECEIVED Liner JUN 0 7) 1996 Perforation depth: measured Al~s~ Oil & Gas Cons. Commission true vertical Anchorage 20. Attachments [] Filing Fee [] Property Plat [] BOP Sketch [] Diverter Sketch [] Ddlling Program [] Drilling Fluid Program [] Time vs Depth PIct [] Refraction Analysis [] Seabed Report [] 20 AAC 25.050 Requirements Contact Engineer Name/Number: Chris West, 564-5089 Prepared By Name/Number Kathy Campoamor, 564-5122 21. I hereby certify that the foregoing i~ true aD~l correct to the best of my knowledge Signed .,~ _~¢/],,,.~. ~ ~/~/q Tim Scofield ' ~,, Title Senior Drilling Engineer Date // 'Commission Use Only Permit Number I APINumber ApproialDate I Seecoverletter d~'L~_ /,,,/~/ 50- ~ ~.. 9- -~- ~ ~" ~"~ ] lC, I q/c~l~ ] for other requirements Conditions of ,~,pproval: Samples Required [] Yes ,,~ No Mud_Log RequireU [] Yes .,~ .No [] N Hydrogen Sulfide Measures I-lYes /~'No Directional Survey Required ~ Yes o Required Working Pressure forBOPE'i-12M; []3M; [] 5M; [] 10M; [] 15M Other: by order of Approved By Commissioner the commission Date Form 10-401 Rev. 12-01-85 Submit In Triplicate I Well Name: I MPE-16i Well Plan Summary I Type of Well (producer or injector): I KuparukWAG InjectorI Surface Location: 3758' FSL 1849' FEL Sec 25 T13N R10E UM., AK. Tari]et Location: 2140' FSL 925' FEL Sec 24 T13N R10E UM., AK. Bottom Hole Location: 2466' FSL 860' FEL Sec 24 T13N R10E UM., AK. Note: Target & BHL footages are based on assumed true and square sections and are not surveyed lei]al locations. I AFE Number: 1337032 J ]Rii]: I Nabors 27E J JEstimated Start Date: I July 15, 1996I Operating days to drill and 113j I case: I MD' 18555' I ~ I TVD' 17337' BKB I IKBE: I57.' I IWell Design (conventional, slimhole, etc.): Ultra Slimhole, 7" Longstring Formation Markers: Formation Tops MD TVD Formation Pressure/EMW Base permafrost 1862 1758 n/a NA (Top Schrader) 4907 4298 1905 psig / 8.0 ppg OA 4447 1955 psig / 8.0 ppg Base Schrader Bluff 5231 4568 1995 psig / 8.0 ppg Top HRZ 7295 6288 n/a Base HRZ 6462 n/a Kupark D Shale 761 9 6558 n/a Kuparuk C 7952 6835 3650 psig / 10 ppg TKA 7037 3669 psig / lO ppg Total Depth 8555 7337 n/a Casini]/Tu bini] Proi]ram: Hol~ ~sg/ ' Wt/Ft Grade Conn Length Top Btm Size Tbi] O.D. MD/TVD MD/TVD 30" 20" 91.1# NT80LHE weld 80 32' 112/112 12 1/4" 9 5/8" 40# L-80 BTRC 5524 31' 5555/4838 8 1/2" 7" 26# L-80 Mod B 8525 30' 8555/7337 N/A (tbg) 2-7/8" 6.5# L-80 NSCT 7590 29' 7619/6558 Internal yield pressure of the 7" 26# casing is 7240 psi. Worst case surface pressure would occur with a full column of gas to the reservoir at 7529' TVDSS. Maximum anticipated surface pressure in this case assuming a reservoir pressure of 3758 psi is 3005 psi, well below the internal yield pressure rating of the 7" casing. The Modified Buttress 7" 26# will be run on bottom. Loggini] Proi]ram: I Open Hole Loi]s: Surface Schrader Bluff Final IMud Loi]s: MWD LWD GR/Resistivity/SFC CSG to TD Neutron/Density over Kuparuk intervals. These logs will be MAD PASS after drilling to avoid stuck pipe risk None required API# 50-029-22XXX MPE-16 WAG Injector RECEIVED JUN 0 3 1996 Al~a 0il & G~ ~as. (~rlmtttitJoll ~rage June 3, 1996 DRILLING HAZARDS AND RISKS: See both the Milne Point E-Pad Data Sheet prepared by Pete Van Dusen for information on the Cascade wells, and review recent wells drilled on E Pad. Most of the trouble time on recent wells has been due to equipment mechanical problems with the surface equipment, rather than formation drilling problems. Hydrates We will have hydrates on E Pad. We will have our mud weight to 11.0 PPG by 2000 feet. We will weight up in 0.5 ppg increments if necessary. We will use the coldest mix water available to minimize warming in the interval. We will use only 8" directional motors to allow lower flow rates. We will control flow rates to 450 to 600 GPM when hydrates are present to keep mud temperatures to a minimum. We will control drilling rate and keep mud viscosity at 100 sec/qt to keep the hole clean. The MPU PE group will be perforating, and cleaning out wells shortly after the rig drills and completes them. This will make the near rig area congested and as a result potentially hazardous. Ensure personnel use caution moving around adjacent production activities. Lost Circulation: The Kuparuk sands and a number of shallower intervals typically are highly fractured. Wells on F Pad have lost varying amounts of mud (from 70 to 1000 bbls) drilling through or near the top of the Kuparuk sands, especially while running casing and cementing. Be prepared to treat these losses while drilling initially with LCM treatments. There has not been any appreciable amount of lost circulation in surface hole on any of the F Pad wellls to date. This is due to setting surface pipe deeper to cover the Schrader Bluff interval which might break down at the mud weights required to TD the well. Stuck Pipe Potential: Well MPF-53 and MPK- 17 were stuck coming out on the short trip at surface casing point. In the MPK-17 well, proir to the stuck pipe incident there was only minor indications that the gravel and coal were present. It appears that we dragged the gravel up into the bottom of the curve and reduced our ability to move up or down. Then we lost the ability to circulate when the hole collapsed around the BHA at 2300 feet. Subsequent fishing operations were successful and a very expensive BHA was recovered. The interval was the first report of hydrateS being present in the well so we had a 11.3 ppg mud weight, but our vis was only 66 sec/qt (26 cp). The Sand/Coal that hydrates were present in probably provided a ledge for the gravel to accumulate in, and fell into the hole when we were tripping out for casing. Future wells should have higher viscosity ( 150 sec/qt )for hole cleaning. Most stuck pipe problems occur when we do not listen to the hole. Regular stuck pipe meeting to identify sticking trends and intervals will be held at the rig. Kick Tolerance: The surface casing setting depth for this well allows a kick tolerance of 98 bbl influx (Gas) based on a 12.5 ppg LOT at the 9-5/8" casing shoe and a estimated reservoir pressure of 3594 psig (10 ppg equivalent MW). Trip Schedules are required for all trips. All trips will be performed with a trip tank or one pit isolated for use as a trip tank. Formation Pressure: The maximum expected pore pressure for this well is 10 ppg EMW (3646 psi @ 7011' ssTVD). There has been no injection in this region since then, therefore the reservoir pressure should not exceed this estimate. We will continue to take the conservative approach to circulate the well until stable before tripping or before running casing. WATER USAGE Have the water truck drivers track the water usage on a daily Icg. Send a copy of this Icg to Dennise Casey in the Anchorage Office on a monthly basis. RECEIVED JUN 0 3 Alaska Oil & Gas Cons, Commission Anchorage API# 50-029-22XXX MPE-16 WAG Injector June 3, 1996 MP E-16 Proposed Summary of Operations . , , , , 10. 11. 12. 13. 14. 15. 16. 17. 18. Drill and Set 20" Conductor. Weld an FMC landing ring for the FMC Gen 5A Wellhead on the conductor. Prepare location for rig move. MIRU Nabors 27E drilling rig. Prior to spud, discuss hydrates drilling with Nabors 22E toolpushers and company representatives J. C. Pyron and D. Montjoy. NU and function test 20" Diverter system. Ensure the diverter is as per AOGCC specifications and is approved by AOGCC supervisor. Build Spud Mud. Drill 12-1/4" surface hole to 5555' md (4838' tvd). Use extreme caution while drilling through the known hydrate interval down to 3100 feet. Run and cement 9-5/8" casing. ND 20" Diverter, NU and Test 13-5/8" BOPE. Run Wear Bushing. RIH w/PDC bit and Double Power Section PDM (motor). Test the 9-5/8" casing to 3000 psig and plot pressure vs volume for LOT baseline. Drill out float equipment and 10 feet of new formation, Perform a LOT to a maximum of 12.5 ppg as per Recommended Practices Manual. Record pressure vs. cumulatrive volume for LOT test for well file. Follow Pad Data Sheet short trip guidelines. Drill 8-1/2" hole to TD at 8555' MD (7337' TVD). (Note: This hole section will be logged with a LWD MAD PASS Triple Combo (GR/Res/Neu/Dens). Use due caution while for both stuck pipe and well control issues. Pull Wear Bushing, and Change Pipe Rams to 7". Run and Cement 7" casing with 1 stage cement program. Test casing to 3500 psi and freeze protect wellbore to 2000' TVD with diesel. Closely monitor casing running loads for drag. Make sure there is a circulating head for the topdrive before starting to run casing. ND BOPE and NU dry hole tree. Release rig to MPE-17 Note: This well will be perforated, and cleaned out with a completion rig and prior to running the ESP completion. MIRU workover completion unit. ND dry hole tree. NU BOPs and test. PU and RIH with 3.5" DP and 6" bit, clean out to PBTD. TOOH. PU and RIH with ROPE perforating string (procedure to be distributed later with perforation intervals). PU and RIH with 3-1/2" NSCT tubing with Dual injection packer completion. Set 2 way check. ND BOPE and NU tree and test. Pull two way check, freeze protect, set BPV, close valves. Test tree. RDMO with workover/completion rig. POST RIG WORK , Complete the handover form and turn it and the well files over to production. Turn over the well files along with the handover form. . A SBT/GR/CCL is required on this well to evaluate the long string cementing for injection. This will be done 2 weeks after cementing to develop the minimum compressive strength. . An adequate volume to cover 2000' of diesel needs to be injected down the 7" X 9-5/8" annulus before moving the rig off the well. Please note type and volume of freeze protection pumped down the outer annulus on the morning report. 4. The rig will not complete this well. PEs will perforate and clean out this well with a pulling unit. API # 50-029-22XXX MPE-16 WAG Injector June 3, 1996 MPE-16 WELL 9-5/8" SURFACE CASING CEMENT PROGRAM - HALLIBURTON CASING SIZE: 9-5/8" CIRC. TEMP 80 deg F at 4000' TVDSS. SPACER: 70 bbls NSCI Spacer weighted to 12 ppg WITH 3/4 PPB FLOCELE LEAD CEMENT TYPE: Type E Permafrost (150 % excess over annular hole volume) ADDITIVES: Retarder ADD 1/4 PPSx FLOCELE. WEIGHT: 12.0 ppg YIELD: 2.17 ft3/sx MIX WATER: 11.63 gal/sk APPROX #SACKS: 1156 THICKENING TIME: Greater than 4 hrs at 50° F. TAIL CEMENT TYPE: Premium G (30% excess over annular hole volume) ADDITIVES: 0.2% CFR-3, 0.2% Halad-344, 2.0% CaC12 WEIGHT: 15.8 ppg APPROX #SACKS: 403 FLUID LOSS: 100-150 cc YIELD:I.15 ft3/sx MIX WATER: 5.0 gal/sk THICKENING TIME: Greater than 4 hrs at 50° F. FREE WATER: 0 CENTRALIZER PLACEMENT: 1. 1 Straight Blade centralizer per joint of 9-5/8" casing on the bottom 10 joints above the FS. 2. 1 TURBULATOR centralizer per joint of 9-5/8" casing from 2000 to 2500 feet. OTHER CONSIDERATIONS: Perform lab tests on mixed cement/spacer/mud program and ensure compatibility prior to pumping job. Ensure thickening times are adequate relative to pumping job requirement. Displace at 12 bpm. Do not overdisplace by more than 1/2 the shoe joint. Mix slurry on the fly -- batch mixing is not necessary. Make sure to fill the casing every joint to avoid having to shut down to fill the casing. Casing has been stuck while the rig was shut down filling only 5 joints. THE RIG SHOULD BE PREPARED TO HANDLE CEMENT RETURNS AT THE SURFACE. CEMENT VOLUME: 1. The Tail Slurry volume is increased to 403 sacks is calculated to cover the 9-5/8" to 500 feet above the Schrader Bluff with 30% excess. 2. The Lead Slurry volume is calculated to cover from the top of the Tail Slurry surface with 30% excess to 1800 feet, and then 150% excess over the permafrost. 3. 80'md 9-5/8", 40# capacity for float joints is 6 BBL. API # 50-029-22XXX June 3, 1996 MPE-16 WAG Injector MPE-16 7" PRODUCTION CASING CEMENT PROGRAM- HALLIBURTON STAGE I CEMENT JOB ACROSS THE KUPARUK: CIRC. TEMP: 115° F BHST 120 deg F at 7040' TVDSS. SPACER: 50 bbls fresh water . 70 bbls Alpha Spacer mixed as per Halliburton specifications weighted to 1.0 ppg above current mud weight. CEMENT TYPE: Premium G ADDITIVES: 0.3% CFR-3, 30#/SK Silicalite, 1.7% Halad 344 WEIGHT: 12.25 ppg YIELD: 2.81 cu ft/sk APPROX # SACKS: 124 FLUID LOSS: < 45cc/30 min @ 140° F MIX WATER: 16 gal/sk THICKENING TIME: 4 1/2 hrs @ 140° F FREE WATER: 0cc @ 45 degree angle. CENTRALIZER PLACEMENT: 1. 7"x 8-1/4" Straight Blade Rigid Centralizers-- two per joint across the Kuparuk Sands from 9512 - 10142(45 total). This will cover 200' above the C Sand. 2. Run one 7" x 8-1/4"Straight Blade Rigid Centralizer inside the 9-5/8" casing shoe. 3. Total 7" x 8-1/4" Straight Blade Rigid Centralizers needed is 46. OTHER CONSIDERATIONS: Perform lab tests on mixed cement/spacer/mud program and ensure compatibility prior to pumping job. Ensure thickening times are adequate relative to pumping job requirement. Displace at 8-10 bpm. Batch mixing is not necessary. Make sure the float collar, float shoe, landing collar, and baffle plate are run in the proper sequence. CEMENT VOLUME: 1. Stage 1 cement volume is calculated to cover 500' md above the Kuparuk Top with 30% excess. API # 50-029-22XXX MPE-16 WAG Injector June 3, 1996 MPE-16 Cement Calculator Milne Point Cement and Centralizer Calculations Well MPE-16 Surface (1 Stage) Cement Job cement Type E G _ Hole Size 12.251 Yeild (cfs) 2.17 1.15 Casing Size 9.625 Weight (ppg) I 2 15.8 BFF 0.0558 BPF + 30% 0.0725 BPF + 150% 0.1395 ! BBLS w/XSF Cu. Ft. Sacks Top_ of Cemenl G Tail Volume 1 055 82.5 463 403 4500 E Tail Volume 2700 195.8 1 099 507 1 800 E Lead Volume 1800 251.0 1409 649 0 Total E I 1 56 Total G 4 0 3 9-5/8" St Blades I 0 from 5555 to 5155 9-5/8" Turbulator I I 0 from 2400 to 2000 Production 1-Stage Cement Job Cement Yield Hole Size 8.5 Silicalite Slurry 2.05 Casing Size 7 BPF 0.0226 BPF + 30% 0.0294 Top of Cement Stage I ..~? ................................................................ .I BBLS Cu. Ft. Sacks ~.Calculated Gentralizers 4 5 Across the Kuparuk . I Total G ST1 1 2 4 Total ST Blades 4 6 Page 1 CRITICAL POINT DATA MD !nc Azi, TVS TiE IN 0 0,00 35.00 0 KOP / START 300 0,00 35.00 300 DF BUILD ~ ~.SO/~OO Ct START OF BUILD 500 3,00 35.00 500 ~ 2,00/100 Ft START BY BUILD 650 6,00 35.00 649 ~ 2,50/~00 Ft START BF BUILD ?70 9,00 35.00 768 ~ 3,00/~C0 Pt START BF ~537 32,00 35.00 1482 CURVE ~ 3,00/100 Ft END BY CURVE 1765 32.26 22. Jl 1675 Base ~862 32.26 22.11 1758 PermsFrost START BF ~965 32.26 22.11 J844 CURVE ~ 3.00/100 Ft END OF CURVE 2~66 33,55 NA Sands 4907 33,55 ll.23 4298 Base Schrader 5231 33,55 11.23 4568 THRZ 7295 33,55 il.aS 6288 TKLS 7619 33,55 11.83 6558 Tar§e~ / TKUC1 7952 33,55 il.aS 6835 N/S E/W ON OE ON OE 4N 3E ~4 N lo E 27 N 19 E 245 N t72 E 351 399 450 555 2040 2216 3335 3510 3691 N 2~9 E N ~49 E N 270 E N 301E N 596 E N 631E N 853 E N 888 E N 924 E VERTICAL VIEW SCALE 500 Ct, / DIVISION TVD RED WELLHEAD VERTICAL SECTION REF: WELLHEAD  TC 0 O,OO ~ 0 MD T_,_ IN 300 O,QO ~ 303 MD KOP / START OF BUILD @ 1,50/i00 Ct 1.50 @ 400 MD 500~ 3.00 ~ 500 MD START OF BUILD ~ 2,03/100 I758 1844 2500-- 3000-- 3500-- 4000-- 4298 5000-- 5500-- 6000-- 6288 6835 7000 7337 6100 ~ 650 MD START OF BUILD e 2,50/100 Ct 9.00 @ 770 ND START OF BUILD ~ 3,03/100 !2.00 ~ 870 MD 15.09 @ 970 MD 18.00 ~ 1070 MD 21.00 8 1170 MD 24,00 ~ 1270 MD 27.00 @ 1370 MD 32.00 ~ !537 MD START OF CURVE @ 3,00/100 31,95 ~ ~637 MD 38,86 ~ 1765 MD END OF CURVE 32~26 ~ ~862 MD Bose 32,26 8 1965 MD START OF CURVE 502 32.78 8 2065 MD 33.55 ~ 2166 MD END OF CURVE 2124 2302 HORIZONTAL VIEW (TRUE NORTH) SCALE 250 Ct, / DIVISION SURVEY REP WELLHEAD 4500 --4250 Z T~7 ~40(X) ~.~:3~ filn, 7337 TVD ~3750 65~ _ i 1.23 - ll,23 ~3~50 --3000 -- 750 ~ 4838 4~8 - I 1.23 ~000 ~lTSO ~1 ~00 t ,~014- 11,23 --500 //x;?:.' ?~ I??~~ I I I z5o ~50 0 250 5~ 750 l~O ~0 l~O 3442 3621 3805 7500 I 0 500 i 000 ! 500 VERTICAL SECTIBN PLANE: 13.8~ 4137 ITapRet N~me TVD NS EW Grid X G~id Y Tap§et 6836 3691N 924 E 570184 6019996 33,55 e 4907 MD NA Scnds 33,55 @ 5831 MD Base Schrader 9 5/8 in OD, ~ 5555 MD, 4838 TVD I I I I 2000 2500 3000 3503 CASING POINT DATA OD MD Inc Azi TVD N/S E/W 9 5/8 in 5555 33.55 11.23 4838 ~392 N 665 E 7 in 8554 33,55 11,23 7337 4018 N 988 E RECEIVED 33,55 ~ 7295 MD THR~ U N 0 3 199G 33,55 ~ 7619 MD TKLB Alaska Otl& Gas Cons, Commission @ 7958 MD ~t~t~geTKUC1 ~3j,~5(]]~ ~5~DMD, 7337 TVD 4000~ 4500 Halliburton Energy Services - Drilling Systems PSL Proposal Report Page 1 Date: 4/25/96 Time: 10:07 am Wellpath ID: MPE-16 Wp2 Last Revision: 4/25/96 Survey Reference: WELLHEAD Reference World Coordinates: Lat. 70.27.18 N - Long. 149.26.04 W Reference GRID System: Alaska State Plane Zone: Alaska 4 Reference GRID Coordinates: (ft): 6016296.91 N 569295.63 E North Aligned To: TRUE NORTH Vertical Section Reference: WELLHEAD Closure Reference: WELLHEAD TVD Reference: WELLHEAD Calculated using the Minimum Curvature Method Computed using WIN-CADDS REV2.2.1 Vertical Section Plane: 13.82 deg. BPX - Shared Services Drilling Alaska State Plane: Zone4 Milne Pt: MPE MPE-16 As-Built MPE- 16 Wp2 Measured Incl Drift Subsea TVD Course T O T A L Depth Dir. Depth Length Rectangular Offsets (ft) (deg.) (deg.) (ft) (ft) (ft) (ft) (ft) GRID Coordinates Northing Easting (ft) (ft) TIE IN 0.00 0.00 0.00 -57.50 0.00 0.00 0.00N KOP / START OF BUILD @ 1.50 deg/100 ft 300.00 0.00 0.00 242.50 300.00 300.00 0.00N 400.00 1.50 35.00 342.49 399.99 100.00 1.07N 0.00E 6016296.91 569295.63 0.00E 6016296.91 569295.63 0.75E 6016297.99 569296.37 Closure Vertical Build Walk DLS Cum. Expected Total Max Hor Min Hor Dir. Vert Dist. Dir. Section Rate Rate Dogleg Rectangular Coords Error Error Max Err Error (ft) (deg.) (ft) (dg/100ft) (dg/100ft) (dg/100ft) (deg) (ft) (ft) (ft) (ft) (deg.) (ft) START OF BUILD @ 2.00deg/100~ 500.00 3.00 35.00 442.41 499.91 100.00 4.29N 600.00 5.00 35.00 542.16 599.66 100.00 10.00N START OF BUILD @ 2.50deg/100R 650.00 6.00 35.00 591.93 649.43 50.00 13.93N 0.0C@ 0.00 0.00 0.00 0.00 0.0C@ 0.00 0.00 0.00 0.00 1.31@ 35.00 1.22 1.50 0.00 3.00E 6016301.23 569298.59 5.23@ 35.00 4.88 1.50 0.00 7.00E 6016306.98 569302.54 12.21@ 35.00 11.39 2.00 0.00 9.75E 6016310.93 569305.25 17.0£@ 35.00 15.85 2.00 0.00 750.00 8.50 35.00 691.12 748.62 100.00 24.26N 16.99E 6016321.33 569312.39 29.62@ 35.00 27.62 2.50 0.00 START OF BUILD @ 3.00deg/100~ 770.00 9.00 35.00 710.89 768.39 20.00 26.76N 18.74E 6016323.84 569314.11 32.6fi@ 35.00 30.46 2.50 0.00 870.00 12.00 35.00 809.20 866.70 100.00 41.68N 29.19E 6016338.86 569324.42 50.8¢@ 35.00 47.45 3.00 0.00 970.00 15.00 35.00 906.43 963.93 100.00 60.80N 42.57E 6016358.10 569337.63 74.23@ 35.00 69.21 3.00 0.00 1070.00 18.00 35.00 1002.30 1059.80 100.00 84.07N 58.86E 6016381.51 569353.70 102.63@ 35.00 95.69 3.00 0.00 1170.00 21.00 35.00 1096.55 1154.05 100.00 lll.41N 78.01E 6016409.03 569372.59 136.0£@ 35.00 126.82 3.00 0.00 1270.00 24.00 35.00 1188.93 1246.43 100.00 142.75N 99.95E 6016440.57 569394.24 174.27@ 35.00 162.50 3.00 0.00 1370.00 27.00 35.00 1279.18 1336.68 100.00 178.01N 124.65E 6016476.06 569418.60 217.31@ 35.00 202.63 3.00 0.00 1470.00 30.00 35.00 1367.05 1424.55 100.00 217.09N 152.01E 6016515.39 569445.60 265.02@ 35.00 247.12 3.00 0.00 START OF CURVE @ 3.00deg/100 ~ 1536.67 32.00 35.00 1424.19 1481.69 66.67 245.22N 171.70E 6016543.69 569465.03 299.3fi@ 35.00 279.14 3.00 0.00 1636.67 31.95 29.33 1509.04 1566.54 100.00 290.00N 199.87E 6016588.73 569492.77 352.21@ 34.57 329.35 -0.05 -5.67 1736.67 32.16 23.69 1593.81 1651.31 I00.00 337.45N 223.53E 6016636.40 569515.99 404.77@ 33.52 381.08 0.20 -5.64 0.36 -5.59 END OF CURVE 1765.00 32.26 22.11 1617.78 1675.28 28.33 351.36N 229.41E 6016650.36 569521.73 419.62@ 33.14 395.99 Survey Tool 0.00 0.0 0.00N 0.00 0.0 0.00 N 1.50 1.5 1.07 N 0.00 E 0.00 0.00 0.00 0.00 MWD 0.00 E 2.00 2.00 0.00 0.36 BPHM-PBD 0.75E 2.00 2.00 305.00 0.51 BPHM-PBD 1.50 3.0 4.28N 2.00 5.0 9.98 N 3.01E 2.02 2.01 305.00 0.66 BPHM-PBD 7.04E 2.09 2.01 305.00 0.81 BPHM-PBD 2.00 6.0 13.89N 9.80E 2.15 2.02 305.00 0.89 BPHM-PBD 2.50 8.5 24.19N 17.10E 2.38 2.04 305.00 1.04 BPHM-PBD 2.50 9.0 26.67N 18.86E 2.45 2.05 305.00 1.07 BPHM-PBD 3.00 12.0 41.51 N 29.43 E 2.93 2.11 305.00 1.22 BPHM-PBD 3.00 15.0 60.49N 43.02E 3.67 2.20 305.00 1.37 BPHM-PBD 3.00 18.0 83.57N 59.58E 4.65 2.35 305.00 1.52 BPHM-PBD 3.00 21.0 110.65N 79.09E 5.87 2.55 305.00 1.69 BPHM-PBD 3.00 24.0 141.66N 101.51 E 7.31 2.81 305.00 1.87 BPHM-PBD 3.00 27.0 176.51N 126.79E 8.98 3.13 305.00 2.07 BPHM-PBD 3.00 30.0 215.09N 154.88E 10.88 3.49 305.00 2.30 BPHM-PBD 3.00 32.0 242.84N 175.11 E 12.24 3.76 305.00 2.47 BPHM-PBD 3.00 35.0 287.21N 204.01E 14.23 4.17 304.18 2.73 BPHM-PBD 3.00 38.0 334.38N 228.31E 16.17 4.59 302.88 3.01 BPHM-PBD 3.00 38.8 348.22N 234.35E 16.71 4.71 302.52 3.09 BPHM-PBD Halliburton Energy Services - Drilling Systems PSL Proposal Report Page 2 Date: 4/25/96 Wellpath ID: MPE-16 Wp2 Measured Incl Drift Subsea TVD Course T O T A L Depth Dir. Depth Length Rectangular Offsets (ft) (deg.) (deg.) (ft) (ft) (ft) (ft) (ft) GRID Coordinates Northing Easting (ft) (ft) Closure Vertical Build Walk DLS Cum. Expected Total Max Hor Min Hor Dir. Vert Dist. Dir. Section Rate Rate Dogleg Rectangular Coords Error Error Max Err Error (ft) (deg.) (ft) (dg/100ft) (dg/100ft) (dg/100ft) (deg) (ft) (ft) (ft) (ft) (deg.) (ft) Base Permafrost 1862.22 32.26 22.11 1700.00 1757.50 97.22 399.44N 248.94E 6016698.61 569540.82 470.6~@ 31.93 447.34 START OF CURVE @ 3.00 deg/100 ft 1965.00 32.26 22.11 1786.91 1844.41 102.78 450.26N 269.59E 6016749.62 569560.99 524.8C@ 30.91 501.63 2065.00 32.78 16.61 1871.25 1928.75 100.00 500.94N 287.38E 6016800.46 569578.30 577.52@ 29.84 555.09 0.00 0.00 0.00 0.00 0.52 -5.50 2165.00 33.54 11.30 1954.98 2012.48 100.00 553.99N 300.54E 6016853.62 569590.96 630.2~@ 28.48 609.74 END OF CURVE 2166.38 33.55 11.23 1956.13 2013.63 1.38 554.74N 300.69E 6016854.37 569591.11 630.9¢@ 28.46 610.51 NA Sands 4906.82 33.55 11.23 4240.00 4297.50 2740.43 2040.29N 595.71E 6018342.49 569872.20 2125.48@ 16.28 2123.53 0.76 -5.31 0.87 -5.20 0.00 0.00 Base Schrader 5230.79 33.55 11.23 4510.00 4567.50 323.98 2215.92N 630.58E 6018518.41 569905.43 2303.9£@ 15.88 2302.40 0.00 0.00 CASING POINT OD = 9 5/8in, ID = 8.84in, Weight= 40.001b/ft. 5554.77 33.55 11.23 4780.00 4837.50 323.98 2391.54N 665.46E 6018694.34 569938.65 2482.4¢@ 15.55 2481.27 0.00 0.00 THRZ 7294.63 33.55 11.23 6230.00 6287.50 1739.87 3334.71N 852.77E 6019639.14 570117.07 3442.02@ 14.34 3441.87 -0.00 -0.00 TKLB 7618.61 33.55 11.23 6500.00 6557.50 323.98 3510.33N 887.64E 6019815.06 570150.30 3620.82@ 14.19 3620.74 0.00 0.00 Target / TKUC 1 7952.18 33.55 11.23 6778.00 6835.50 333.57 3691.16N 923.56E 6019996.20 570184.50 3804.94@ 14.05 3804.91 -0.00 -0.00 CASING POINT OD = 7 in, ID = 6.28 in, Weight = 26.00 lb/ft. 8554.42 33.55 11.23 7279.90 7337.40 602.24 4017.62N 988.39E 6020323.24 570246.25 4137.42@ 13.82 4137.42 0.00 0.00 8554.54 33.55 11.23 7280.00 7337.50 0.12 4017.69N 988.40E 6020323.30 570246.26 4137.48@ 13.82 4137.48 0.00 0.00 Survey Tool 0.00 38.8 396.05N 254.48E 18.59 5.13 301.44 3.37 BPHM-PBD 0.00 38.8 446.62N 275.75E 20.59 5.58 300.52 3.68 BPHM-PBD 3.00 41.8 497.16N 294.03E 22.48 6.02 299.32 3.98 BPHM-PBD 3.00 44.8 550.13N 307.54E 24.32 6.46 297.89 4.30 BPHM-PBD 3.00 44.9 550.88N 307.70E 24.35 6.47 297.88 4.30 BPHM-PBD 0.00 44.9 2034.50N 612.49E 77.21 19.51 286.36 13.51 BPHM-PBD 0.00 44.9 2209.89N 648.52E 83.53 21.09 285.96 14.62 BPHM-PBD 0.00 44.9 2391.54N 665.46E 0.00 0.00 0.00 0.00 BPHM-PBD 0.00 44.9 3327.22N 878.06E 123.93 31.14 284.41 21.69 BPHM-PBD 0.00 44.9 3502.61N 914.09E 130.28 32.72 284.26 22.80 BPHM-PBD 0.00 44.9 3683.21N 951.19E 136.81 34.35 284.11 23.94 BPHM-PBD 0.00 44.9 4017.62N 988.39E 0.00 0.00 0.00 0.00 BPHM-PBD 0.00 44.9 4009.31N 1018.19E 148.62 37.29 283.88 26.01 BPHM-PBD H~RIZ~NTAL VIEW (TRUE NISRTH) SCALE 500 Ft, / DIVISIEIN ,~ SURVEY REF: WELLHEAD ~ --4~500 BPX- Sho, ned Set'vice:, ]3miLLing Ato, sl<o, Sro, re PLane; Zone4 HP - 6 ReFerence ~eLL - HPE-~6 HD: 0 - 8555 Ft. ~n%ePvet, 50 F%. ALL B~ections usin~ P Highside He%hod Lines ame ~he EXPECTED ~isience Cimdes ape the 8.P. FLSWJN6/SHUT-iN condition 340 3~0 ~80 0 3OO 275 25O 225 2OO 175 150 125 100 75 20 J ; ; i HALLIBURTON ~ /,'? / ,' 4125/96 945 am 4O 6O 8O lO0 24O / / 180 CLOSEST POINTS We((poth Sbt Distance MPE-22 HWD HPE-22 As-B~L~ 263,36 HPE-13 ST~2 MPE-13 219.14 HPE-13 ST MPE-13 219,14 MPE-O~OH HPE-OgOH 181.87 MPE-08 HPE-08 127,26 MPE-07 MPE-07 28.84 MPE-06 MPE-06 57.47 MPE-05 HPE-05 85,74 MPE-04 MPE-04 66.97 MPE-03 MPE-03 422.20 MPE-02 MPE-02 320,41 MPE-23 MPE-23 29,88 MPE-20 MPE-20 As-B~(t 160,63 HPE-OI MPE-01 ~03,44 HPE-15 HPE-!5 198,28 MPE-19 Wpl MPE-lg As-B~L~ 59.53 MPE-I7 Wp1 HPE-17 As-Bult~ 119,20 HPE-!3~2 HPE-13 219,14 MPE-13 MPE-13 219,14 MPE-tl GIHR MPE-11 161.09 MPE-iO MPE-IO 294.92 MPE-OgST MPE-OgOH 181,83 Dipec~ion 284.73 275,28 27528 261.34 212.93 302.71 272.65 271.25 235,65 305.82 312.19 142,22 221,27 304.57 194,93 141.93 141,85 275.28 275,28 242,63 264,11 261.36 ReF MD 200.00 50.00 50.00 300.00 2150.00 550.00 1050.00 1150.00 1450.00 750.00 950.00 100.00 50,00 900,00 50.00 0,00 50.00 50.00 50,00 1200,00 300,00 ReF TVD 200,00 50.00 50,00 300.00 t999.97 549.81 1040,75 1135.34 1407,18 748,62 944.58 100,00 50.00 896,00 50,00 0.00 50.00 50.00 50,00 50.00 1181.98 300.00 Sep,Factor 79.00 173,30 173,30 42.60 3.40 4.80 4.50 6,00 220 55.50 31.90 27.40 274.00 22,00 229.00 59,50 211,80 173.30 173,30 127,40 24.20 42,60 120 140 1800 Depth(Ct) Too~ Ccx~ PF~E- 16 I~ PI~E- 13 ST~. PE-13 ST 0-8555 80.03 BPH4-PBD 0-14333 E~),O~ I~Iq-H-PBD 0-5910 80.01 BcYrJ-PBD 5g13-18?g5 E).05 I~PIH~4~D-PBD 1L~45-16867 20.03 BcH'4-PBD 16350-16350 10.00 PRELECTED D-SglO 80.01 l~°"r'ra-PB D 5g13-12795 Eg.05 }~PIH~PBD 12845-13575 80,03 Bot-N-PBD 0-4880 80.01 B:'rra-PBD 4907-13808 20.05 I~IH~4WD-PBD 13938-13938 10.00 PRilECTED 0-10388 20,01 ]BR-ra-PBD 0-8~50 80.08 BPCC--PBD 0-8347 20,08 BFCG-PBD 0-9438 9.99LN<N]WN o-ggo0 20.08 B:CC-PBD 0-11520 L:~O.C)8 I~PC[rPBD 11650-11650 80.03 ]~PrH-PBD 0-9635 ~.~ ~PBD ~PBD ~-lg 53~ 10.~ ~CTED ~1 ~17212 0.~ ~ ~-17~1 ~18131 0.~ . 4 -12~ .~ PBD Alaska 0,1 ~ CO~~~ n"~"~-14~ ~0~ ~CIED ~T ~4~ ~,01 ~PBD 4~7-1~ ~.~ ~BD [ l~-i~ ~,~ ~PBD [ 1457~14570 10,~ ~CTED Halliburton Travelling Cylinder Report Computed using WIN-CADDS REV2.2.1 Page 1 Date: 4/25/96 Time: 9:46 am Normal Plane Method All distances are between EXPECTED Positions REFERENCE WELL: BPX - Shared Services Drilling Alaska State Plane: Zone4 Milne Pt: MPE MPE-16 As-Built MPE-16 Wp2 N/S and E/W are measured from the WELLHEAD TVD is measured from the WELLHEAD Interval Step Depth 50.00 ft.(MD) From 0.00 To 8554.54 ft.(MD) All Directions using BP Highside Method in Dec.Deg. Ail Depths and Distance are in FEET All distances are between EXPECTED Positions Closest Points Slot Wellpath Distance Direction MPE-22 As-Built MPE-22 MWD 263.36 284.73 3864.20 147.94 MPE-13 MPE-13 ST#2 219.14 275.28 6926.03 265.37 MPE-13 MPE-13 ST 219.14 275.28 6926.03 265.37 MPE-09OH MPE-09OH 181.87 261.34 472.63 192.40 MPE-08 MPE-08 127.26 212.93 131.53 195.83 MPE-07 MPE-07 28.84 302.71 30.57 285.55 MPE-06 MPE-06 57.47 272.65 66.59 238.50 MPE-05 MPE-05 85.74 271.25 89.16 255.95 MPE -04 MPE-04 66.97 235.65 MPE-03 MPE-03 422.20 305.82 5999.86 292.75 MPE-02 MPE-02 320.41 312.19 1194.66 333.37 MPE-23 MPE-23 29.88 142.22 30.59 142.68 MPE-20 As-Built MPE-20 160.63 221.27 1327.39 219.11 MPE-01 MPE-01 203.44 304.57 285.92 261.08 MPE-15 MPE-15 198.28 194.93 2698.96 229.55 MPE-19 As-Built MPE-19 Wpl 59.53 141.93 13123.25 119.99 MPE-17 As-Built MPE-17 Wpl 119.20 141.85 1725.88 164.40 MPE-13 MPE-13 #2 219.14 275.28 6928.52 265.36 RefMD 200.00 2600.00 50.00 8554.54 50.00 8554.54 300.00 1650.00 2150.00 2200.00 550.00 650.00 1050.00 1200.00 1150.00 1200.00 1450.00 750.00 8554.54 950.00 6700.00 100.00 300.00 50.00 2800.00 900.00 1400.00 50.00 2550.00 0.0~ 4500.00 50.00 2050.00 50.00 8554.54 RefTVD 200.00 2375.01 50.00 7337.50 50.00 7337.50 300.00 1577.85 1999.97 2041.65 549.81 649.43 1040.75 1181.98 1135.34 1181.98 1407.18 748.62 7337.50 944.58 5791.93 100.00 300.00 50.00 2541.69 896.00 1363.30 50.00 2333.34 0.00 3958.46 50.00 1916.13 50.00 7337.50 Sep Factor 79.0 17.5 173.3 20.4 173.3 20.4 42.6 19.3 3.4 3.4 4.8 4.5 4.5 4.0 6.0 5.7 2.2 55.5 6.9 31.9 3.0 27.4 7.6 274.0 26.6 22.0 14.6 229.0 23.2 59.5 11.3 211.8 20.8 173.3 20.4 Halliburton Travelling Cylinder Report Computed using WIN-CADDS REV2.2.1 Page 2 Date: 4/25/96 Time: 9:46 am Normal Plane Method All distances are between EXPECTED Positions REFERENCE WELL: BPX - Shared Services Drilling Alaska State Plane: Zone4 Milne Pt: MPE MPE-16 As-Built MPE-16 Wp2 N/S and E/W are measured from the WELLHEAD TVD is measured from the WELLHEAD Interval Step Depth 50.00 ft.(MD) From 0.00 To 8554.54 ft.(MD) All Directions using BP Highside Method in Dec. Deg. AH Depths and Distance are in FEET Ail distances are between EXPECTED Positions Closest Points Slot Weilpath MPE-13 MPE-13 Distance Direction Ref MD Ref TVD Sep Factor 219.14 275.28 50.00 50.00 7052.22 265.69 8554.54 7337.50 MPE-11 MPE-11GIHR 161.09 242.63 463.43 211.17 MPE-10 MPE-10 294.92 264.11 424.48 200.71 MPE-09OH MPE-09ST 181.83 261.36 469.72 192.39 50.00 1450.00 1200.00 1850.00 300.00 1650.00 50.00 1407.18 1181.98 1747.16 300.00 1577.85 173.3 20.6 127.4 25.8 24.2 14.1 42.6 19.2 Halliburton Travelling Cylinder Report Computed using WIN-CADD$ RE1/2.2.1 Page 1 Date: 4/25/96 Time: 9:46 am Normal Plane Method All distances are between EXPECTED Positions REFERENCE WELL: BPX - Shared Services Drilling Alaska State Plane: Zone4 Milne Pt: MPE MPE-16 As-Built MPE-16 Wp2 N/S and E/W are measured from the WELLHEAD TVD is measured from the WELLHEAD Interval Step Depth 50.00 ft.(MD) From 0.00 To 8554.54 ft.(MD) All Directions using BP Highside Method in Dec.Deg. All Depths and Distance are in FEET AH distances are between EXPECTED Positions Close Approach Status Offset Flowing Zone Flowing Shut-in Enter Well Safety Min. Safety Safety Shut-in Clear Spread MD TVD Dist Dist Zone MD MPE-22 MWD 254.9 258.7 300 300 4.5 0.8 MPE-13 ST# 212.3 216.1 300 300 4.5 0.8 MPE-13 ST 212.3 216.1 300 300 4.5 0.8 MPE-09OH 172.4 176.7 350 350 5.2 0.9 MPE-08 58.8 85.0 2150 2000 31.5 5.4 MPE-07 13.9 21.4 600 600 9.0 1.5 MPE-06 28.0 41.7 1100 1088 16.5 2.7 MPE-05 54.1 68.5 1150 1135 17.3 2.9 MPE-04 15.3 33.4 1450 1407 21.8 3.6 MPE-03 402.4 412.4 800 798 12.0 2.0 MPE-02 293.5 306.7 1050 1041 15.8 2.6 MPE-23 22.1 25.8 300 300 4.5 0.8 MPE-20 153.0 156.8 300 300 4.5 0.8 MPE-01 179.8 191.7 950 945 14.3 2.4 MPE-15 193.4 195.9 200 200 3.0 0.5 MPE-19 Wpl 50.1 55.1 400 400 6.0 1.0 MPE-17 Wpl 109.7 114.7 400 400 6.0 1.0 MPE-13 #2 212.3 216.1 300 300 4.5 0.8 MPE-13 212.3 216.1 300 300 4.5 0.8 MPE-11 GIH 153.8 157.6 300 300 4.5 0.8 MPE-10 263.3 278.9 1250 1228 18.8 3.1 MPE-09ST 172.3 176.7 350 350 5.2 0.9 Enter Exit Exit Danger Danger Shut-in Zone Zone Zone MD MD MD Close Approach Status OK OK OK OK OK OK OK OK OK OK OK OK OK OK OK OK OK OK OK OK OK OK ALo. sko. PLo, ne', HPE-I T~veBng ~inde~ - Nominal Plane RePePence ~eLL - ~PE-~6 ~ MD: 0 ~900 r~, Inte~vab 50 Pt. ALt Directions using BP Highslde Method Lines ~ne ~he EXPECTED ~is~Qnce Cinc[es Qne ~he B.P, FL~WING/SHUT-IN condition - Shaped Services OpiLkin9 Zone4 340 320 280 / , /i/ f' i HALLIBUR-rBN I ; / / ',,, / ,,Si ./ x. 4125196 10:00 om 0 300 275 250 225 20O 175 150 125 100 2O 4O 6O 75 8O lO0 240 200 CLOSEST POINTS WeE~oo~h S[ot Distonce MPc-22 MWD MPE-22 As-Buit~ 263,36 MPE-!3 ST~2 MPE-!3 2i9,14 MPE-13 ST MPE-13 219,14 MPE-Og~H MPE-OgOH 181,87 MPE-08 MPE-08 i87,15 MPE-07 MPE-07 28,84 MPE-06 MPE-06 57,47 MPE-05 MPE-05 85.74 MPE-04 MPE-04 66,97 MPE-03 MPE-03 422.20 MPE-02 MPE-02 380.41 MPE-23 MPE-23 29,88 MPE-20 MPE-20 As-B~tt 160,63 MPE-0i MPE-Oi 2:~)3.44 MPE-i5 MPE-15 198,28 MPE-19 Wpl MPE-19 As-Buitt 59.53 MPE-17 Wo1 MPE-~7 As-B~tt 119,20 MPE-13 82 MPE-13 219.14 MPE-13 MPE-!3 219,14 MPE-11 GIHR MPE-!i t6t.09 MPE-IO MPE-iO 294,92 MPE-OgST MPE-OgOH 181,83 180 ~mectlon 284.73 275.28 275.28 261,34 266.36 302.71 272,65 271.25 235.65 305,82 312.19 142.22 221,27 304.57 194.93 141.93 141,85 275.28 275.28 242,6B 264,11 261,36 ReF MD 200,00 50.0] 50.00 300.00 1900.0] 550.00 1050,00 1150,00 1450,0] 750.00 950.00 100,00 50,00 900.00 50,00 0,00 50.00 50.00 50.00 1200.0] ReF TVD 203,0] 50,00 50.00 300.00 1789.45 549.81 1040,75 1135.34 1407.18 748.62 944.58 100,00 50.00 896.00 50,00 0.00 50.0] 50.00 50.00 50,00 1181.98 300.0] Sep,Factor 79,00 173,30 173.30 42.60 6,40 4.80 4,50 6.00 2,20 55.50 31.90 27,40 274.00 22,00 229,0] 59.50 211.80 173.30 173,30 127.40 24,20 42,60 120 140 1800 ~l~E- 16 ~0-8555 80,03 i~PE-L:~ ~1) ~14~ ~,~ ~BD ~-13 gT~2~10 ~,01~BD ~13-12~ ~.~ ~PBD 1~4~1~7 ~.~ ~BD ~-13 ST ~10 ~.01~PBD 4~7-1~ ~,~ ~BD 1~-1~ ~0.~~CTED ~ ~1~ ~,01~PBD ~ ~7 ~,~ ~PBD ~ ~ ~ ~BD ~-~ ~l~ ~.~ ~PBD ~-~ ~4745 ~ ~PBD ~1 ~97~ 9.~ ~-53~ 10,~ ~CTEB ~7~7 ~,~ ~-13 ~13 ~.01 ~BD ~-11 ~ ~4~ ~.01 ~PgD t~1~ 10.~ ~CTEB ~-10 ~ ~.Ol 14~-14~ 10.~ ~T ~4~ ~.Ot~BD 4~7-1~ ~.~ ~BD ~-144~ ~.~ ~BD ~457~4~0 ~0.~~CTED Halliburton Travelling Cylinder Report Computed using WIN- CADDS REV2.2.1 Page 1 Date: 4/25/96 Time: 10:00 am Normal Plane Method All distances are between EXPECTED Positions REFERENCE WELL: BPX - Shared Services Drilling Alaska State Plane: Zone4 Milne Pt: MPE MPE-16 As-Built MPE-16 Wp2 N/S and E/W are measured from the WELLHEAD TVD is measured from the WELLHEAD Interval Step Depth 50.00 ft.(MD) From 0.00 To 1900.00 ft.(MD) All Directions using BP Highside Method in Dec. Deg. AH Depths and Distance are in FEET All distances are between EXPECTED Positions Close Approach Status Offset Flowing Zone Flowing Shut-in Well Safety Min. Safety Safety Clear Spread MD TVD Dist Dist MPE-22 MWD 254.9 258.7 300 300 4.5 0.8 MPE-13 ST# 212.3 216.1 300 300 4.5 0.8 MPE-13 ST 212.3 216.1 300 300 4.5 0.8 MPE-09OH 172.4 176.7 350 350 5.2 0.9 MPE-08 129.3 153.0 1900 1789 28.5 4.7 MPE-07 13.9 21.4 600 600 9.0 1.5 MPE-06 28.0 41.7 1100 1088 16.5 2.7 MPE-05 54.1 68.5 1150 1135 17.3 2.9 MPE-04 15.3 33.4 1450 1407 21.8 3.6 MPE-03 402.4 412.4 800 798 12.0 2.0 MPE-02 293.5 306.7 1050 1041 15.8 2.6 MPE-23 22.1 25.8 300 300 4.5 0.8 MPE-20 153.0 156.8 300 300 4.5 0.8 MPE-01 179.8 191.7 950 945 14.3 2.4 MPE-15 193.4 195.9 200 200 3.0 0.5 MPE-19 Wpl 50.1 55.1 400 400 6.0 1.0 MPE-17 Wpl 109.7 114.7 400 400 6.0 1.0 MPE-13 #2 212.3 216.1 300 300 4.5 0.8 MPE-13 212.3 216.1 300 300 4.5 0.8 MPE-11 GIH 153.8 157.6 300 300 4.5 0.8 MPE-10 263.3 278.9 1250 1228 18.8 3.1 MPE-09ST 172.3 176.7 350 350 5.2 0.9 Enter Enter Exit Exit Shut-in Danger Danger Shut-in Zone Zone Zone Zone MD MD MD MD Close Approach Status OK OK OK OK OK OK OK OK OK OK OK OK OK OK OK OK OK OK OK OK OK OK Halliburton Travelling Cylinder Report Computed using WIN- CADDS RE V2.2.1 Page 1 Date: 4/25/96 Time: 10:00 am Normal Plane Method All distances are between EXPECTED Positions REFERENCE WELL: BPX - Shared Services Drilling Alaska State Plane: Zone4 Milne Pt: MPE MPE-16 As-Built MPE-16 Wp2 N/S and E/W are measured from the WELLHEAD TVD is measured from the WELLHEAD Interval Step Depth 50.00 ft.(MD) From 0.00 To 1900.00 ft.(MD) All Directions using BP Highside Method in Dec. Deg. All Depths and Distance are in FEET All distances are between EXPECTED Positions Closest Points Slot WeHpath Distance Direction MPE-22 As-Built MPE-22 MWD 263.36 284.73 764.07 194.19 MPE-13 MPE-13 ST#2 219.14 275.28 730.13 241.92 MPE-13 MPE-13 ST 219.14 275.28 730.13 241.92 MPE-09OH MPE-09OH 181.87 261.34 472.63 192.40 MPE-08 MPE-08 187.15 266.36 MPE-07 MPE-07 28.84 302.71 30.57 285.55 MPE-06 MPE-06 57.47 272.65 66.59 238.50 MPE-05 MPE-05 85.74 271.25 89.16 255.95 MPE-04 MPE-04 66.97 235.65 MPE-03 MPE-03 422.20 305.82 766.20 271.43 MPE-02 MPE-02 320.41 312.19 436.85 288.34 MPE-23 MPE-23 29.88 142.22 30.59 142.68 MPE-20 As-Built MPE-20 160.63 221.27 850.52 224.19 MPE-01 MPE-01 203.44 304.57 285.92 261.08 MPE-15 MPE-15 198.28 194.93 1478.40 227.58 MPE-19 As-Built MPE-19 Wpl 59.53 141.93 676.75 151.19 MPE-17 As-Built MPE-17 Wpl 119.20 .141.85 1125.12 170.49 MPE-13 MPE-13 #2 219.14 275.28 730.12 241.92 RefMD 200.00 1900.00 50.00 1800.00 50.00 1800.00 300.00 1650.00 1900.00 550.00 650.00 1050.00 1200.00 1150.00 1200.00 1450.00 750.00 1900.00 950.00 1900.00 100.00 300.00 50.00 1900.00 900.00 1400.00 50.00 1900.00 0.00 1900.00 50.00 1900.00 50.00 1800.00 RefTVD 200.00 1789.45 50.00 1704.88 50.00 1704.88 300.00 1577.85 1789.45 549.81 649.43 1040.75 1181.98 1135.34 1181.98 1407.18 748.62 1789.45 944.58 1789.45 100.00 300.00 50.00 1789.45 896.00 1363.30 50.00 1789.45 0.00 1789.45 50.00 1789.45 50.00 1704.88 Sep Factor 79.0 19.3 173.3 27.3 173.3 27.3 42.6 19.3 6.4 4.8 4.5 4.5 4.0 6.0 5.7 2.2 55.5 18.4 31.9 10.0 27.4 7.6 274.0 32.0 22.0 14.6 229.0 26.7 59.5 12.8 211.8 22.4 173.3 27.3 MPE-13 MPE-13 219.14 275.28 50.00 50.00 173.3 Halliburton Travelling Cylinder Report Computed using WIN-CADDS REV2.2.1 Page 2 Date: 4/25/96 Time: 10:00 am Normal Plane Method All distances are between EXPECTED Positions REFERENCE WELL: BPX - Shared Services Drilling Alaska State Plane: Zone4 Milne Pt: MPE MPE-16 As-Built MPE-16 Wp2 N/S and E/W are measured from the WELLHEAD TVD is measured from the WELLHEAD Interval Step Depth 50.00 ft.(MD) From 0.00 To 1900.00 ft.(MD) All Directions using BP Highside Method in Dec.Deg. Ail Depths and Distance are in FEET Ail distances are between EXPECTED Positions Closest Points Slot Wellpath Distance Direction Ref MD Ref TVD Sep Factor 730.12 241.92 1800.00 1704.88 27.3 MPE-11 MPE-11 GIHR 161.09 242.63 463.43 211.17 MPE-10 MPE-10 294.92 264.11 424.48 200.71 MPE-09OH MPE-09ST 181.83 261.36 469.72 192.39 50.00 1450.00 1200.00 1850.00 300.00 1650.00 50.00 1407.18 1181.98 1747.16 300.00 1577.85 127.4 25.8 24.2 14.1 42.6 19.2 BPX- Sho.:ed Set'vices ]3mikLinO : ................. 'x ALo. sl<c to. te PLo. ne', Zone4 HiLne PC ' HPE- G As-D i( Tm~velllng Cylindem - NominaL PLane ReFenence ~ell - NPE-~G ~p~ ~: ~800 - 855~ F~, interval, 50 F~, ALL Directions using ~P Highside Method Lines ~ne ~he EXPECTED ~ist~nce QncLes ~ne the ~.P, FL~WING/SHUT IN condltlon / X zf f' i HAI_LIBURTBN J'l I ! i ./! ./ 300 280 4125196 9:5E em 340 300 20 275 320 250 40 2~5 200 175 150 100 6O 75 260 240 120 220 200 ~ 160 180 CLOSEST POINTS Wettp~th S[ot Distance Direction Re? MD ReC TVD MPE-22 HWD MPE-22 As-BuiLt 659.80 200.81 180(3.00 1704,88 MPE-13 ST~2 MPE-!3 730.13 24i.92 1800.00 1704,88 MPE-!3 ST MPE-i3 730.13 241.92 1800,00 1704.88 MPE-OgOH MPE-OgOH 572.74 182,50 1800.00 1704.88 MPE-OB MPE-O8 i27,26 212,93 2150,00 i999,97 MPE-07 MPE-07 516,56 215,04 1800,00 1704,88 MPE-06 MPE-06 289,83 171,19 1800,00 1704,88 MPE-05 MPE-05 578,62 176,g7 1800,00 1704,88 MPE-04 MPE-04 260,5! 156,22 1800,00 1704,88 MPE-03 MPE-O3 708,52 272.83 1800,00 1704.88 MPE-O~ MPE-02 423.00 289,40 1800.00 1704,88 MPE-23 MPE-23 522.99 201,81 1800.00 1704,88 MPE-20 MPE-20 As-Bui[t 788.42 ~24.05 1800.00 1704.88 MPE-O1 MPE-0I 475.60 236,96 1800.00 1704,88 MPE-15 MPE-!5 1230,56 225,21 1800,00 1704,88 MPE-ID Wpl MPE-19 As-BuiLt 589.73 152.88 1800.00 1704.88 MPE-!7 WoA MPE-17 As-BuiLt 952,53 172.16 1800,00 1704.88 MPE-13 ~2 MPE-!3 730.12 241.92 1800.00 1704.88 MPE-I3 MPE-13 730,12 241.92 i800.00 1704,88 M?E-i1G!HR MPE-ii 746,63 194,35 i800.00 i704.88 MPE-IO MPE-!O ,~32,75 205.71 i800,00 i704.88 MPE-OgST MPE-OgOH 568.77 182,48 1800.00 i704.88 Sep. F~ctor 19.80 27.30 27.30 19,50 3.40 16.70 6.50 10,40 4.70 i9,50 25,20 33.10 15,60 28,80 12.90 23,00 27,30 27,30 26,60 14.20 19,40 2450 Dep~?~) Toc4 Co~e NPE-16 ~ 0-8555 20.03 }~PBD ~:~E-~~ 0-14333 20.03 B:HM-PBD NPE-13 ST~~10 ~,01~PBD ~13-1~ ~.~ ~BD 1~5-1~ ~.~ ~PBD 1~1~ 10.~ ~CTED ~-13 ~ ~10 ~.01~PBD ~13-127~ ~.~ ~BD 1~5-i~ ~.~ ~BD ~ ~4~ ~,01~BD 4~7-1~ ~.~ 1~-1~ 10,~ ~CTED ~ ~1~ ~,01 ~7 ~ ~,~ ~PBD ~ ~7 ~.~ ~PBD ~ ~ ~.~ ~PBD ~ ~ ~.~ ~PBD ~ ~ ~.~ ~PBD ~-~ ~ ~.~ ~PBD ~-~ ~4745 ~.~ ~PBD ~1 ~7~ g.~ ~ ~-~5 ~ ~,~ ~PBD 53~ ~0,~ ~CTED ~-lg WD~ ~7~ 0,~ ~ ~-13 ~0 ~,0~ ~BD ~7~7 ~,~ ~BD 6~ ~.~ ~BD ~-~3 ~3 ~.01 ~PBD ~7-~ ~.~ ~BD ~-~ ~ ~4~ ~.01 ~PBD 4~ ~.~ ~BD ~ ~0.~ ~CTED ~-10 ~5~ ~,01 ~PBD ~14145 ~,~ ~BD 14~-14~ 10.~ ~CTED ~T ~4~ ~.01 ~PBD 4~Z-I~ ~.~ ~BD 1~-1~ ~,~ ~PBD 145Y~I45ZO 10,~ ~CTED 8O 100 Halliburton Travelling Cylinder Report Computed using WIN- CADDS REV2.2.1 Page 1 Date: 4/25/96 Time: 9:52 am Normal Plane Method All distances are between EXPECTED Positions REFERENCE WELL: BPX - Shared Services Drilling Alaska State Plane: Zone4 Milne Pt: MPE MPE-16 As-Built MPE-16 Wp2 N/S and E/W are measured from the WELLHEAD TVD is measured from the WELLHEAD Interval Step Depth 50.00 ft.(MD) From 1800.00 To 8554.54 ft.(MD) All Directions using BP Highside Method in Dec. Deg. All Depths and Distance are in FEET All distances are between EXPECTED Positions Close Approach Status Offset Flowing Zone Flowing Shut-in Enter Well Safety Min. Safety Safety Shut-in Clear Spread MD TVD Dist Dist Zone MD MPE-22 MWD 599.5 622.0 1800 1705 27.0 4.5 MPE-13 ST# 676.4 698.9 1800 1705 27.0 4.5 MPE-13 ST 676.4 698.9 1800 1705 27.0 4.5 MPE-09OH 516.4 538.9 1800 1705 27.0 4.5 MPE-08 58.8 85.0 2150 2000 31.5 5.4 MPE-07 458.6 481.1 1800 1705 27.0 4.5 MPE-06 218.2 240.7 1800 1705 27.0 4.5 MPE-05 496.1 518.6 1800 1705 27.0 4.5 MPE-04 178.4 200.9 1800 1705 27.0 4.5 MPE-03 645.2 667.7 1800 1705 27.0 4.5 MPE-02 357.5 380.0 1800 1705 27.0 4.5 MPE-23 475.2 497.7 1800 1705 27.0 4.5 MPE-20 737.6 760.1 1800 1705 27.0 4.5 MPE-01 418.0 440.5 1800 1705 27.0 4.5 MPE-15 1160.8 1183.3 1800 1705 27.0 4.5 MPE-19 Wpl 517.2 539.7 1800 1705 27.0 4.5 MPE-17 Wpl 884.1 906.6 1800 1705 27.0 4.5 MPE-13//2 676.4 698.9 1800 1705 27.0 4.5 MPE-13 676.4 698.9 1800 1705 27.0 4.5 MPE-11 GIH 691.5 714.0 1800 1705 27.0 4.5 MPE-10 347.4 369.9 1800 1705 27.0 4.5 MPE-09ST 512.5 535.0 1800 1705 27.0 4.5 Enter Exit Exit Danger Danger Shut-in Zone Zone Zone MD MD MD Close Approach Status OK OK OK OK OK OK OK OK OK OK OK OK OK OK OK OK OK OK OK OK OK OK RECEIVED JUN 0 3 t~9g AL~ka Oil & ~ don~. Commission Halliburton Travelling Cylinder Report Computed using WIN-CADDS REV2.2.1 Page 1 Date: 4/25/96 Time: 9:52 am Normal Plane Method All distances are between EXPECTED Positions REFERENCE WELL: BPX - Shared Services Drilling Alaska State Plane: Zone4 Miine Pt: MPE MPE-16 As-Built MPE-16 Wp2 N/S and E/W are measured from the WELLHEAD TVD is measured from the WELLHEAD Interval Step Depth 50.00 ft.(MD) From 1800.00 To 8554.54 ft.(MD) All Directions using BP Highside Method in Dec. Deg. Ail Depths and Distance are in FEET All distances are between EXPECTED Positions Closest Points Slot WeHpath Distance Direction MPE-22 As-Built MPE-22 MWD 659.80 200.81 3864.20 147.94 MPE-13 MPE-13 STg2 730.13 6926.03 MPE-13 MPE-13 ST 730.13 6926.03 MPE-09OH MPE-09OH 572.74 MPE-08 MPE-08 127.26 131.53 MPE-07 MPE-07 516.56 5750.56 MPE-06 MPE-06 289.83 MPE-05 MPE-05 578.62 MPE-04 MPE-04 260.51 MPE-03 MPE-03 708.52 5999.86 MPE-02 MPE-02 423.00 1194.66 MPE-23 MPE-23 522.99 8971.80 MPE-20 As-Built MPE-20 788.42 1327.39 MPE-01 MPE-01 475.60 MPE-15 MPE-15 1230.56 2698.96 MPE-19 As-Built MPE-19Wpl 589.73 13123.25 MPE-17 As-Built MPE-17Wpl 952.53 1725.88 MPE-13 MPE-13 #2 730.12 6928.52 MPE-13 MPE-13 730.12 7052.22 RefMD RefTVD Sep Factor 1800.00 1704.88 19.8 2600.00 2375.01 17.5 241.92 1800.00 1704.88 265.37 8554.54 7337.50 27.3 20.4 241.92 1800.00 1704.88 265.37 8554.54 7337.50 27.3 20.4 182.50 1800.00 1704.88 19.5 212.93 2150.00 1999.97 195.83 2200.00 2041.65 3.4 3.4 215.04 1800.00 1704.88 160.58 5050.00 4416.83 16.7 15.6 171.19 1800.00 1704.88 6.5 176.97 1800.00 1704.88 10.4 156.22 1800.00 1704.88 4.7 272.83 1800.00 1704.88 292.75 8554.54 7337.50 19.5 6.9 289.40 1800.00 1704.88 333.37 6700.00 5791.93 11.0 3.0 201.81 1800.00 1704.88 126.72 5600.00 4875.20 25.2 14.7 224.05 1800.00 1704.88 219.11 2800.00 2541.69 33.1 26.6 236.96 1800.00 1704.88 15.6 225.21 1800.00 1704.88 229.55 2550.00 2333.34 152.88 1~0~ B'~O~' D 119.99 4500.00 3958.46' 172.16 164 0 2 0 0 241.92 1800.~ ~/~.88 265.36 8554.54 7337.50 28.8 23.2 12.9 11.3 23.0 20.8 27.3 20.4 241.92 1800.00 1704.88 265.69 8554.54 7337.50 27.3 20.6 MPE-11 MPE-11GIHR 746.63 194.35 1800.00 1704.88 26.6 Halliburton Travelling Cylinder Report Computed using WIN-CADDS REV2.2.1 Page 2 Date: 4/25/96 Time: 9:52 am Normal Plane Method All distances are between EXPECTED Positions REFERENCE WELL: BPX - Shared Services Drilling Alaska State Plane: Zone4 Milne Pt: MPE MPE-16 As-Built MPE-16 Wp2 N/S and E]W are measured from the WELLHEAD TVD is measured from the WELLHEAD Interval Step Depth 50.00 ft.(MD) From 1800.00 To 8554.54 ft.(MD) All Directions using BP Highside Method in Dec. Deg. All Depths and Distance are in FEET All distances are between EXPECTED Positions Closest Points Slot Wellpath Distance Direction RefMD RefTVD Sep Factor MPE-10 MPE-10 402.75 205.71 1800.00 1704.88 14.2 424.48 200.71 1850.00 1747.16 14.1 MPE-09OH MPE-09ST 568.77 182.48 1800.00 1704.88 19.4 · WELL PERMIT CHECKLIST COMPANY FIELD & POOL . ~-~ ,.~'/~::>~:::~ INIT CLASS /- WELL NAME GEOL AREA PROGRAM: exp [] dev [] redrll [] se~/~/wellbore seg [] ann. disposal para req [] UNIT# //~.~(~;j> -- ON/OFF SHORE ~ ~ .) ADMINISTRATION DATE .. . 2. 3. 4. 5. 6. 7. 8. 9. 10. 11. 12. 13. Permit fee attached ....................... Lease number appropriate ................... Unique well name and number ................. Well located in a defined pool ............. .... Well located proper distance from drlg unit boundary .... Well located proper distance from other wells ........ Sufficient acreage available in ddlling unit ........... If deviated, is wellbore plat included ............. Operator only affected party .................. Operator has appropriate bond in force ............. Permit can be issued without conservation order ...... Permit can be issued without administrative approval .... Can permit be approved before 15-day wait ......... ENGINEERING REMARKS APPR DATE 4. Conductor str~ng prodded N 15. Surface casing protects all ~;;r~ L~E~/s' N 16. CMT vol adequate to circulate on conductor & surf csg . . . .~ 17. CMT vol adequate to tie-in long string to surf csg ...... 18. CMT will cover all known productive hodzons ......... (~ N 19. Casing designs adequate for C, T, B & permafrost ..... ~ N 20. Adequate tankage or reserve pit ................ Y~ N 21. If a re-drill, has a 10-403 for abndnmnt been approved .... 22. Adequate wellbore separation proposed ............ (~ N 23. If diverter required, is it adequate ................ ~ N 24. Ddlling fluid program schematic & equip list adequate .... N 25. BOPEs adequate ........................ N 26. BOPE press rating adequate; test to ,v~"O OO psig. N 27. Choke manifold complies w/APl RP-53 (May 84) ....... N 28. Work will occur without operation shutdown .......... (~ N 29. Is presence of H2S gas probable ............... y / 30. Permit can be issued w/o hydrogen sulfide measures ..... Y ~," ///) ~ 31. Data presented on potential overpressure zones ....... ~ ~'{.~/)rJ . 32. Seismic analysis of shallow gas zones ............ ~ _N 33. seabed condition survey (if off-shore) ........... ,/'. Y N 34. Contact name/phone for weekl~ progress repo~ ..../... Y N ~[e,~pforatory on~y] GEOLOGY ,~:~,R DATE GEOLOGY: ENGINEERING: COMMISSION: RP~ BEW~/,~3' DWJ JDH ----' JDN TAB ~ Comments/Instructions: HOW/I~- A:~CORMS'cheklist rev 4/96 Well History File APPENDIX Information of detailed nature that is not particularly germane to the Well Permitting Process but is part of the history file. To improve the readability of the Well History file and to simplify finding information, information, of this nature is accumulated at the end of the file under APPENDIX. No special effort has been made to chronologically organize this category of information. JA,~,i '1 0 1997' Date Ar~chorage MICROFILMED * ALASKA COMPUTING CENTER * . ............................ . ....... SCHLUMBERGER ....... . ............................ . COMPANY NAME : B.P. EXPLORATION WELL NAME : MPE-16 FIELD NAME : MILNE POINT BOROUGH : NORTH SLOPE STATE : ALASKA API NUMBER : 500292268600 REFERENCE NO : 96378 * ALASKA COMPUTING CENTER * ....... SCHLUMBERGER ....... COMPANY NAME : B.P. EXPLORATION WELL NAME : MPE-16 FIELD NAME : MILNE POINT BOROUGH : NORTH SLOPE STATE : ALASKA API NUMBER : 500292268600 REFERENCE NO : 96378 LIS Tape Verification Listing Schlumberger Alaska Computing Center 9-JAN-1997 13:03 PAGE: **** REEL HEADER **** SERVICE NAME : EDIT DATE : 97/01/ 9 ORIGIN . FLIC REEL NAME : 96378 CONTINUATION # : PREVIOUS REEL : CO~4ENT . B.P. EXPLORATION, MILNE POINT MPE-16, API #50-029-22686-00 **** TAPE HEADER **** SERVICE NA~E : EDIT DATE : 97/01/ 9 ORIGIN · FLIC TAPE NAME : 96378 CONTINUATION # : 1 PREVIOUS TAPE : COGENT · B.P. EXPLORATION, MILNE POINT MPE-16, API #50-029-22686-00 TAPE H~ER MILNEPOINT MWDLOGS WELL NAME: API NUMBER: OPERATOR: LOGGING COMPANY: TAPE CREATION DATE: JOB DATA JOB ~ER: LOGGING ENGINEER: OPERATOR WITNESS: SURFACE LOCATION SECTION: TOWNSHIP: RANGE: FNL: FSL: FEL: ELEVATION (FT FROM MSL O) KELLY BUSHING: DERRICK FLOOR: GROUND LEVEL: BIT RUN 1 96378 ST. AMOUR PYRON WELL CASING RECORD 1 ST STRING 2ND STRING MPE-16 500292268600 B.P. EXPLORATION SCHLUMBERGER WELL SERVICES 9-JAN-97 BIT RUN 2 BIT RUN 3 25 13N iOE 3758 1849 54.00 54.00 24.00 OPEN HOLE CASING DRILLERS BIT SIZE (IN) SIZE (IN) DEPTH (FT) 8.500 9.875 3985.0 LIS Tape Verification Listing Schlumberger Alaska Computing Center 9-JAN-1997 13:03 3RD STRING PRODUCTION STRING Well drilled 26-NOV through 30-NOV-96 with CDR/ADN. All data was collected in a single bit run. Due to surface hardware problemsj some of the data was obtain- ed as washdown and some as drilling. The data was all spliced in the field and is presented here as only MWD data. $ $ PAGE: **** FILE HEADER **** FILE NAME : EDIT .001 SERVICE · FLIC VERSION ' O01CO1 DATE ' 97/01/ 9 MAX REC SIZE : 1024 FILE TYPE : LO LAST FILE : FILE HEADER FILE NUNiBER: 1 EDITED MERGED MWD Depth shifted and clipped curves; all bit runs merged. DEPTH INCRE~fENT: 0.5000 FILE S~Y LDWG TOOL CODE $ BASELINE CURVE FOR SHIFTS: GR CURVE SHIFT DATA (NiEASURED DEPTH) START DEPTH STOP DEPTH 3899.5 8401.5 BASELINE DEPTH 88888 0 8270 0 8260 5 8249 0 8201 5 8196 5 8167 5 8153 0 8144 0 8142 0 8129 0 8124.5 8115.5 8112.5 8097.5 .......... EQUIVALENT UNSHIFTED DEPTH .......... ....... 88882.5 8264.5 8257.5 8245.0 8197 5 8192 0 8163 5 8148 5 8138 5 8137 0 8124 5 8120 0 8111 0 8109 5 8093 0 LIS Tape Verification Listing Schlumberger Alaska Computing Center 8086.5 8080.5 8056.0 8022.0 8017.0 8015.0 8005.5 7997.5 7982.0 7956.0 7948.5 7938.5 7923.5 7901.5 7890.5 7876.0 7854.5 7837.0 7803.5 7785.5 7774.0 7735.5 7712.5 7703.5 7695.0 7687.0 7675.5 7669.0 7633.5 7620.5 7612.0 7603.5 7587 0 7570 0 7560 5 7555 0 7540 0 7527 0 7513.5 7497.5 7468.0 7452.0 7435.5 7426.5 7420.5 7394.5 7377.0 7374.5 7358.0 7340.5 7322.0 7309.0 7296.5 7292.0 7282.0 8083.5 8075.5 8051.5 8017.5 8012.0 8010.0 8000.5 7993.0 7978.5 7953.5 7945.5 7935.0 7921.5 7899.0 7888.0 7873.5 7852 5 7834 5 7801 0 7782 5 7771 0 7732 5 7709 0 7700 0 7689 5 7681.0 7672.0 7665.5 7628.5 7615.5 7606.0 7597.5 7581.5 7564.0 7554.5 7548.0 7535.0 7521.5 7508.0 7491.5 7462 0 7446 5 7430 0 7419 0 7412 5 7389 0 7370, 0 7365.5 7353.5 7339.0 7320.5 7306.0 7295.5 7290.5 7279.5 9-JAN-1997 13:03 PAGE: LIS Tape Vez~ication Listing Schlumberger Alaska Computing Center 7270.0 7268.0 7252.5 7247.0 7237.5 7235.5 7235.5 7233.5 7222.0 7220.5 7214.5 7213 . 0 7206.0 7205.5 7183.5 7184.0 7168.5 7167.0 7155.0 7152.0 7136.5 7136.5 7135.0 7133.0 7127.5 7125.0 7108.5 7106.0 7092.0 7089.0 7069.5 7066.5 7054 . 0 7049.5 7039.0 7034.0 7035.5 7030.0 7010.0 7006.0 6995.5 6991.0 6991.5 6988.0 6972.0 6966.5 6948.0 6943 . 0 6931.0 6924.5 6923.0 6915.5 6921.0 6914.5 6906.0 6900.0 6880.0 6875.5 6864.0 6860.0 6831.0 6827.5 6827.5 6823.5 6798.5 6796.5 6772.0 6770.5 6724.5 6722.0 6715.0 6713 . 0 6670.0 6667.0 6658.5 6655.5 6634.0 6630.0 6628.5 6623.0 6624.5 6619.0 6621.0 6615.0 6619.5 6612.5 6603.0 6596.5 6585.5 6581.0 6546.0 6539.0 6533.0 6527.5 6511 . 5 6505.0 6441 . 5 6437.0 6403 . 5 6400.5 6379.0 6377.5 6376.5 6373 . 0 6332.0 6328.0 6308.5 6306.0 6288.0 6285.5 9-JAN-1997 13: 03 PAGE: LIS Tape Verification Listing Schlumberger Alaska Computing Center 6279.0 6270.5 6225.0 6210.0 6182.5 6176o 5 6169.0 6150.0 6130.0 6118.0 6113.0 6090.0 6075.0 6006.5 5997.5 5898.5 5869.0 5673.5 5591.0 5548.0 5470.5 5439.0 5339.5 5330.5 5306.0 5271.5 5241.5 5163.5 5077.0 5065.0 5049.5 5034.0 5025.5 5011.0 4971.5 4960.0 4932.0 4881.5 4876.5 4861.0 4850.5 4830.5 4826.5 4804.5 4787.0 4766.0 4751.5 4729.0 4713.5 4622.5 4614.5 4608.0 4584.5 4568.0 4552.0 6275.5 6267.0 6221 0 6207 0 6179 5 6172 5 6166 0 6147 5 6125 5 6113 0 6108 5 6085.5 6070.0 6002.0 5992.0 5894.0 5862.0 5665.0 5581.5 5539.5 5461.5 5430.5 5329.5 5319.0 5295.0 5260.5 5231.0 5153.0 5069.5 5054.0 5039 0 5025 0 5014 5 5000 5 4959 5 4949 0 4920 5 4868. 0 4864.5 4850. 0 4839. 0 4820. 0 4815. 0 4792.5 4775.5 4754.5 4740.5 4717.0 4702. 0 4612.5 4605. 0 4598.5 4571 . 0 4555. 0 4540.5 9-JAN-1997 13: 03 PAGE: LIS Tape Verification Listing Schlumberger Alaska Computing Center 9-JAN-1997 13: 03 PAGE: 4518.5 4508.0 4501.0 4490.0 4475.5 4464.5 4461.5 4451.5 4439.5 4429.0 4419.5 4409.0 4411.5 4401.5 4386.0 4376.0 4345.5 4334.0 4256.5 4244.5 4220.5 4208.5 4213.5 4201.0 4204.0 4193.5 4194.0 4182.5 4184.5 4172.5 4169.5 4158.5 4161.0 4151.0 4154.5 4144.5 4129.5 4120.5 4108.5 4099.5 4101.0 4092.5 4059.5 4051.5 4040.5 4033.0 4030.0 4022.0 4021.5 4014.0 3999.0 3991.5 100.0 92.5 $ MERGED DATA SOURCE LDWG TOOL CODE .............. $ REMARKS: BIT RUN NO. AiERGE TOP MERGE BASE The depth adjustments shown above reflect the ~D GR to the CBT GRCH logged by SWS. All other MWD curves were carried with the GR. This file also contains the Very Enhanced QRO resisitivity with 2' average that was reprocessed at GeoQuest. The ADN quadrant outputs are as follows: ROBB/ROBU/ROBL/ROBR are bottom, upper, left, and right quadrant density; and are also listed as RHO1, RH02, RH03, RH04 in the LDWG listing. The other outputs (Delta Rho, PEF, Max. Density) are listed with their quadrants as DRHB/DRHU/DRHL/DRHR, PEB/PEU/ PEL/PER, and ROMB/ROMU/ROML/ROMR. The LDWG outputs of CALA and CALS are HDIA and VDIA respectively. $ LIS FORMAT DATA LIS Tape Ver=£ication Listing Schlumberger Alaska Computing Center 9-JAN-1997 13: 03 PAGE: ** DATA FORMAT SPECIFICATION RECORD ** ** SET TYPE - 64EB ** TYPE REPR CODE VALUE 1 66 0 2 66 0 3 73 68 4 66 1 5 66 6 73 7 65 8 68 0.5 9 65 FT 11 66 15 12 68 13 66 0 14 65 FT 15 66 68 16 66 1 0 66 0 ** SET TYPE - CHAN ** N~E SERV UNIT SERVICE API API API API FILE NUMB NUblB SIZE REPR PROCESS ID ORDER # LOG TYPE CLASS MOD NUMB SAMP ELEM CODE (HEX) DEPT FT 039089 O0 000 O0 0 1 1 1 4 68 0000000000 RA MWD OHIdM 039089 O0 000 O0 0 1 1 1 4 68 0000000000 RP MWD 0P24~ 039089 O0 000 O0 0 1 1 1 4 68 0000000000 VRA MWD OH~R4 039089 O0 000 O0 0 1 1 1 4 68 0000000000 VRP MWD OH~R4 039089 O0 000 O0 0 1 1 1 4 68 0000000000 DER MWD 0H~24 039089 O0 000 O0 0 1 1 1 4 68 0000000000 FET MWD HR 039089 O0 000 O0 0 1 1 1 4 68 0000000000 ROP MWD FPHR 039089 O0 000 O0 0 1 1 1 4 68 0000000000 GR MWD GAPI 039089 O0 000 O0 0 1 1 1 4 68 0000000000 RHOB MWD G/C3 039089 O0 000 O0 0 1 1 1 4 68 0000000000 DRHO MWD G/C3 039089 O0 000 O0 0 1 1 1 4 68 0000000000 PEF MWD BN/E 039089 O0 000 O0 0 1 1 1 4 68 0000000000 CALNMWD IN 039089 O0 000 O0 0 1 1 1 4 68 0000000000 CALAMWD IN 039089 O0 000 O0 0 1 1 1 4 68 0000000000 CALSMWD IN 039089 O0 000 O0 0 1 1 1 4 68 0000000000 TNP~MWD. 039089 O0 000 O0 0 1 1 1 4 68 0000000000 NPHIMWD. PU-S 039089 O0 000 O0 0 1 1 1 4 68 0000000000 ** DATA ** DEPT. 8401.500 RA.MWD -999.250 RP.MWD -999.250 VRA.~WD VRP.MWD -999.250 DER.MWD -999.250 FET.MWD -999.250 ROP.MWD GR.MWD -999.250 RHOB.MWD -999.250 DRHO.MWD -999.250 PEF.MWD CALN.MWD -999.250 CALA.MWD -999.250 CALS.MWD -999.250 TNRA.MWD. -999.250 214.326 -999.250 -999.250 LIS Tape Ver=£ication Listing Schlumberger Alaska Computing Center 9-JAN-1997 13:03 PAGE: NPHI.MWD. -999.250 DEPT. 8000.000 RA.MWD VRP.MWD 5.303 DER.MWD GR.MWD 95.573 RHOB.MWD CALN. MWD 8.500 CALA.MWD NPHI.MWD. 32.400 DEPT. 6000.000 RA.MWD VRP.MWD 2.257 DER.MWD GR.MWD 122.179 RHOB.MWD CALN. MWD 8.500 CALA.MWD NPHI.MWD. 39.200 DEPT. 4000.000 RA.MWD VRP.MWD 4.557 DER.MWD GR.MWD 86.075 RHOB.MWD CALN.MWD 8.500 CALA.MWD NPHI.MWD. 46.300 DEPT. 3907.000 RA.MWD VRP.MWD -999.250 DER.MWD GR.MWD -999.250 RHOB.MWD CALN.MWD 8.500 CALA.MWD NPHI.MWD. 54.000 5. 288 RP. MWD 5. 301 FET. MWD 2. 432 DRHO.MWD 9. 929 CALS. MWD 2. 353 RP.MWD 2. 294 FET. MWD 2. 424 DRHO.MWD 10. 536 CALS.MWD 5. 228 RP.MWD 4. 849 FET.MWD 2. 323 DRHO.MWD 8. 974 CALS.MWD -999.250 RP.MWD -999.250 FET.MWD -999.250 DRHO.MWD 8.935 CALS.MWD 5.307 VRA.MWD -12.831 ROP.MWD -0.005 PEF.MWD 9.335 TNRA.MWD. 2. 261 VRA . MWD 0.271 ROP.MWD O. O17 PEF. MWD 10. 669 TNRA . MWD . 4.669 VRA.MWD -999.250 ROP.MWD 0.037 PEF.MWD 9.053 TNRA.MWD. -999.250 VRA.MWD -999.250 ROP.MWD -999.250 PEF.MWD 8.868 TNRA.MWD. 5.389 144. 000 2. 420 20. 748 2.371 267. 837 3.303 23.217 4.926 -999.250 3.324 25.473 -999.250 -999.250 -999.250 28.224 ** END OF DATA ** **** FILE TRAILER **** FILE NAME : EDIT .001 SERVICE · FLIC VERSION - O01CO1 DATE · 97/01/ 9 MAX REC SIZE : 1024 FILE TYPE : LO LAST FILE : **** FILE HEADER **** FILE NAME : EDIT .002 SERVICE : FLIC VERSION : O01CO1 DATE : 97/01/ 9 MAX REC SIZE : 1024 FILE TYPE : LO LAST FILE : FILE HEADER FILE NUMBER LIS Tape Ver~£ication Listing Schlumberger Alaska Computing Center 9-JAN-1997 13:03 PAGE: RAW MWD Curves and log header data for each bit run in separate files. BIT RUN NUMBER: i DEPTH INCREfflENT: O. 5000 FILE SU~ff4ARY VENDOR TOOL CODE START DEPTH ~ 3908.0 $ LOG HEADER DATA DATE LOGGED: SOFTWARE: SURFACE SOFTWARE VERSION: DOWNHOLE SOFTWARE VERSION: DATA TYPE (MEMORY or REAL-TIME): TD DRILLER (FT) : TOP LOG INTERVAL (FT) : BOTTOM LOG INTERVAL (FT) : BIT ROTATING SPEED (RPM) : HOLE INCLINATION (DEG) MINIMUM ANGLE: MAXIMUM ANGLE: STOP DEPTH .......... 8407.0 TOOL STRING (TOP TO BOTTOM) VENDOR TOOL CODE TOOL TYPE CDR RESIST./GR ADN DENS./NEUT. $ BOREHOLE AND CASING DATA OPEN HOLE BIT SIZE (IN) : DRILLERS CASING DEPTH (FT): BOREHOLE CONDITIONS MUD TYPE: MUD DENSITY (LB/G): MUD VISCOSITY (S) : MUD PH: MUD CHLORIDES (PPM) : FLUID LOSS (C3): RESISTIVITY (OP~4~) AT TEMPERATURE (DEGF) : MUD AT MEASURED TEMPERATURE (MT): MUD AT MAX CIRCULATIONG TEMPERATURE : MUD FILTRATE AT (MT): MUD CAKE AT (MT): NEUTRON TOOL MA TRIX: MATRIX DENSITY: HOLE CORRECTION (IN): 30-NOV-96 FAST 4.0 4.0 MEMORY 8401.0 3900.0 8401.0 60 30.7 31.3 TOOL NUMBER ........... RGS022 ADN045 8.500 3985.0 LSND 10.00 47.0 2. 150 65.0 2.040 65.0 SANDSTONE 2.65 TOOL STANDOFF (IN): 1.0 LIS Tape Ver~£ication Listing Schlumberger Alaska Computing Center 9-JAN-1997 13:03 PAGE: 10 EWR FREQUENCY (HZ): 20000 REMARKS: ************ RUN 1 ************* RES TO BIT: 57.15'; GR TO BIT: 67.57' NEUT TO BIT: 114.50'; DENS TO BIT: 111.29' DRILLING - 3993/5648, 6215/7438, 8030/8407 WASHDOWN - 5648/6215, 7438/8030 ACQUSITION DISJOINTED DUE TO SURFACE HARDWARE FAILURE DATA SPLICED INTO ONE FILE IN FIELD-PRESENTED AS MWD TNPH AND GR ARE ENVIRONMENTALLY CORRECTED $ LIS FORMAT DATA ** DATA FORMAT SPECIFICATION RECORD ** ** SET TYPE - 64EB ** TYPE REPR CODE VALUE 1 66 0 2 66 0 3 73 120 4 66 1 5 66 6 73 7 65 8 68 O. 5 9 65 FT 11 66 8 12 68 13 66 0 14 65 FT 15 66 68 16 66 1 0 66 1 ** SET TYPE - CHAN ** NAME SERVUNIT SERVICE API API API API FILE NUMB NUMB SIZE REPR PROCESS ID ORDER # LOG TYPE CLASS MOD NUMB SAMP ELE~ CODE (HEX) DEPT FT 039089 O0 000 O0 0 2 1 1 4 68 0000000000 ATR LW1 0I~4~ 039089 O0 000 O0 0 2 1 1 4 68 0000000000 PSR LW1 0P2~4 039089 O0 000 O0 0 2 1 1 4 68 0000000000 DER LW1 0~4~ 039089 O0 000 O0 0 2 1 1 4 68 0000000000 TABR LW1 039089 O0 000 O0 0 2 1 1 4 68 0000000000 ROPE LW1 F/HR 039089 O0 000 O0 0 2 1 1 4 68 0000000000 GR LW1 GAPI 039089 O0 000 O0 0 2 1 1 4 68 0000000000 TABD LW1 039089 O0 000 O0 0 2 1 1 4 68 0000000000 ROMT LW1 G/C3 039089 O0 000 O0 0 2 1 1 4 68 0000000000 LIS Tape Ver=£ication Listing Schlumberger Alaska Computing Center 9-JAN-1997 13:03 PAGE: 11 NAME SERV UNIT SERVICE API API API API FILE NUmB NUMB SIZE REPR PROCESS ID ORDER # LOG TYPE CLASS MOD NUMB SAMP ELE~ CODE (HEX) ROMB LW1 G/C3 039089 O0 000 O0 0 2 1 1 4 68 0000000000 ROBB LW1 G/C3 039089 O0 000 O0 0 2 1 1 4 68 0000000000 ROBU LW! G/C3 039089 O0 000 O0 0 2 1 1 4 68 0000000000 ROBL LW1 G/C3 039089 O0 000 O0 0 2 1 1 4 68 0000000000 ROBR LW1 G/C3 039089 O0 000 O0 0 2 1 1 4 68 0000000000 DRHB LW1 G/C3 039089 O0 000 O0 0 2 1 1 4 68 0000000000 DRHULW1 G/C3 039089 O0 000 O0 0 2 1 1 4 68 0000000000 DRHL LW1 G/C3 039089 O0 000 O0 0 2 1 1 4 68 0000000000 DRHR LW1 G/C3 039089 O0 000 O0 0 2 1 1 4 68 0000000000 PEB LW1 039089 O0 000 O0 0 2 1 1 4 68 0000000000 PEU LW1 039089 O0 000 O0 0 2 1 1 4 68 0000000000 PEL LW1 039089 O0 000 O0 0 2 1 1 4 68 0000000000 PER LW1 039089 O0 000 O0 0 2 1 1 4 68 0000000000 CALN LW1 IN 039089 O0 000 O0 0 2 1 1 4 68 0000000000 TNRA LW1 039089 O0 000 O0 0 2 1 1 4 68 0000000000 TNPH LW1 PU 039089 O0 000 O0 0 2 1 1 4 68 0000000000 DPHB LW1 PU 039089 O0 000 O0 0 2 1 1 4 68 0000000000 DCAL LW1 IN 039089 O0 000 O0 0 2 1 1 4 68 0000000000 HDIA LW1 IN 039089 O0 000 O0 0 2 1 1 4 68 0000000000 VDIA LW1 IN 039089 O0 000 O0 0 2 1 1 4 68 0000000000 RPM LW1 RPM 039089 O0 000 O0 0 2 1 1 4 68 0000000000 ** DATA ** DEPT. 8407. 000 ATR. LW1 TABR . LW1 - 999.250 ROPE. LW1 ROMT. LW1 - 999.250 ROMB. LW1 ROBL. LW1 - 999. 250 ROBR. LW1 DRHL.LW1 -999.250 DRHR.LW1 PEL . LW1 - 999.250 PER. LW1 TNPH.LW1 -999.250 DPHB.LW1 VDIA . LW1 -999. 250 RPM. LW1 DEPT. TABR . LW1 ROMT. LW1 ROBL. LW1 DRHL. LW1 PEL. LW1 TNPH. LW1 VDIA. LW1 DEPT. TABR . LW1 ROMT. LW1 ROBL. LW1 DRHL. LW1 PEL . LW1 TNPH. LW1 8000. 000 -12. 822 2 450 2 466 0 069 2 538 32 000 8 735 6000. 000 O. 270 2.386 2. 450 O. 072 3. 041 36.500 A TR . LW1 ROPE. LW1 ROMB. LW1 ROBR. LW1 DRHR . LW1 PER. LW1 DPHB. LW1 RPM. LW1 A TR . LW1 ROPE. LW1 ROMB . LW1 ROBR. LW1 DRHR. LW1 PER. LW1 DPHB. LW1 -999 250 214 326 -999 250 -999 250 -999 250 -999 250 -999 250 -999.250 4. 914 157. 910 2. 460 2. 434 O. 025 2. 458 14. 000 66. 144 2. 443 260. 892 2. 419 2.387 0.103 3. 018 13.100 PSR. LW1 - 999.250 DER. LW1 GR.LW1 -999.250 TABD.LW1 ROBB. LW1 - 999. 250 ROBU. LW1 DRHB. LW1 - 999. 250 DRHU. LW1 PEB.LW1 -999.250 PEU. LW1 CALN. LW1 -999.250 TNRA.LW1 DCAL. LW1 - 999. 250 HDIA. LW1 PSR . LW1 GR. LW1 ROBB. LW1 DRHB. LW1 PEB. LW1 CALN. LW1 DCAL. LW1 PSR . LW1 GR. LW1 ROBB. LW1 DRHB. LW1 PEB. LW1 CALN. LW1 DCAL. LW1 4. 791 DER. LW1 98 491 TABD. LW1 2 420 ROBU. LW1 - 0O10 DRHU. LW1 2 540 PEU. LW1 8 886 TNRA. LW1 0 386 HDIA. LW1 2. 350 DER. LW1 139. 287 TABD. LWi 2. 433 ROBU. LW1 O . O14 DRHU. LW1 3. 226 PEU. LW1 9.446 TNRA . LW1 O. 946 HDIA. LW1 -999.250 -999.250 -999.250 -999.250 -999.250 -999.250 -999.250 4.828 -12 422 2 411 0 104 2 669 20 598 8 935 2. 383 0.435 2.219 0.213 3.303 22.296 lO. 536 LIS Tape Ver~£ication Listing Schlumberger Alaska Computing Center 9-JAN-1997 13:03 PAGE: 12 VDIA. LW1 11 . 162 RPM. LW1 43 . 000 DEPT. 4000. 000 ATR. LW1 TABR. LW1 -999. 250 ROPE. LW1 ROMT. LW1 2.313 ROMB . LW1 ROBL. LW1 2. 251 ROBR. LW1 DRHL. LW1 0.104 DRHR . LW1 PEL. LW1 3. 054 PER. LW1 TNPH. LW1 48.300 DPHB. LW1 VDIA . LW1 9.070 RPM. LW1 DEPT. 3907. 000 ATR. LW1 TABR. LW1 -999. 250 ROPE. LW1 ROMT. LW1 -999. 250 ROMB. LW1 ROBL. LW1 -999. 250 ROBR. LW1 DRHL . LW1 -999. 250 DRHR . LW1 PEL.LWl - 999. 250 PER. LW1 TNPH.LW1 -999.250 DPHB.LW1 VDIA. LW1 -999. 250 RPM. LW1 5. 288 PSR. LW1 -999. 250 GR. LW1 2. 343 ROBB. LW1 2.245 DRHB . LW1 O . 055 PEB . LW1 3. 244 CALN. LW1 23. 200 DCAL. LW1 45. 369 -999. 250 PSR. LW1 -999. 250 GR. LW1 - 999. 250 ROBB. LW1 - 999. 250 DRHB. LW1 -999. 250 PEB. LW1 -999. 250 CALN. LW1 -999. 250 DCAL. LW1 -999.250 4. 752 DER. LW1 95. 904 TABD. LW1 2. 267 ROBU. LW1 O. 026 DRHU. LW1 2. 883 PEU. LW1 9. 571 TNRA. LW1 1 . 071 HDIA. LW1 - 999. 250 DER. LW1 -999. 250 TABD. LW1 -999. 250 ROBU. LW1 - 999. 250 DRHU. LW1 ~ 999. 250 PEU. LW1 - 999. 250 TNRA. LWl -999. 250 HDIA. LW1 4. 925 -999.250 2.204 0.133 2.947 26. 046 9.120 -999.250 -999.250 -999.250 -999.250 -999.250 -999.250 -999.250 ** EArD OF DATA ** **** FILE TRAILER **** FILE NAME : EDIT .002 SERVICE : FLIC VERSION : O01CO1 DATE : 97/01/ 9 MAX REC SIZE : 1024 FILE TYPE : LO LAST FILE : **** TAPE TRAILER **** SERVICE NAME : EDIT DATE . 97/01/ 9 ORIGIN · FLIC TAPE NAME : 96378 CONTINUATION # : 1 PREVIOUS TAPE COM~iENT : B.P. EXPLORATION, MILNE POINT MPE-16, API #50-029-22686-00 **** REEL TRAILER **** SERVICE NAME : EDIT DATE . 97/01/ 9 ORIGIN : FLIC REEL NAME : 96378 CONTINUATION # : PREVIOUS REEL : CO£4~ENT : B.P. EXPLORATION, MILNE POINT MPE-16, API #50-029-22686-00 ~° I~ o o ~" (") 0 0