Alaska Logo
Department of Commerce, Community, and Economic Development
Alaska Oil and Gas Conservation
Commission
Loading...
HomeMy WebLinkAbout196-101Pages NOT Scanned in this Well History File XHVZE This page identifies those items that were not scanned during the initial scanning project. They are available in the Original file and viewable by direct inspection. i~ ~ - I O/File Number of Well History File PAGES TO DELETE Complete RESCAN [] Color items - Pages: Grayscale, halftones, pictures, graphs, charts- Pages: Poor Quality Original- Pages: [] Other- Pages' DIGITAL DATA [] Diskettes, No. [] Other, No/Type OVERSIZED [] Logs of various kinds [] Other COMMENTS: Scanned by: Bevedy ~ TO RE-SCAN Vincent Nathan Lowell Notes: Re-Scanned by: Beverly Dianna Vincent Nathan Lowell Date: ~si • STATE OF ALASKA • T ' .4 s 'It/. • ALASKA OIL AND GAS CONSERVATION COMMISSION WELL COMPLETION OR RECOMPLETION REPORT AND L O �,- ,.. la. Well Status: ❑ Oil ❑ Gas ❑ SPLUG ❑ Other ® Abandoned ❑ Suspended 1 b. Well Class: 20AAC 25.105 20AAC 25.110 IR Development ❑ Exploratory ❑ GINJ ❑ WINJ ❑ WAG ❑ WDSPL ❑ Other No. of Completions Zero ❑ Service ❑ Stratigraphic 2. Operator Name: 5. Date Comp., Susp., or Aband.: 12. Permit to Drill Number: BP Exploration (Alaska) Inc. 9/27/2012 196 - 101 312 - 342 3. Address: 6. Date Spudded: 13. API Number: P.O. Box 196612, Anchorage, Alaska 99519 - 6612 6/06/1996 50 029 - 21471 - 01 - 00 4a. Location of Well (Governmental Section): 7. Date T.D. Reached: 14. Well Name and Number: Surface: 6/10/1996 PBU B -27A 496' FNL, 1595' FEL, Sec. 31, T11 N, R14E, UM 8. KB (ft above MSL): 75.40' 15. Field / Pool( s ) Top of Productive Horizon: 1008' FSL, 2591' FWL, Sec. 29, T11 N, R14E, UM GL (ft above MSL): 44.32' Prudhoe Bay Field / Prudhoe Bay Total Depth: 9. Plug Back Depth (MD +TVD): Oil Pool 432' FSL, 3382' FWL, Sec. 29, T11 N, R14E, UM 11370' 9066' 4b. Location of Well (State Base Plane Coordinates, NAD 27): 10. Total Depth (MD +TVD): 16. Property Designation: Surface: x- 664032 y- 5950155 Zone- ASP4 11415' 9073' ADL 028310 TPI: x- 668179 y - 5951750 Zone ASP4 11. SSSV Depth (MD +TVD): 17. Land Use Permit: Total Depth: x- 668984 y- 5951193 Zone- ASP4 None 18. Directional Survey: ❑Yes El No 19. Water depth, if offshore: 20. Thickness of Permafrost (TVD): (Submit electronic and printed information per 20 AAC 25.050) _ N/A ft MSL 1900' (Approx.) 21. Logs Obtained (List all logs here and submit electronic and printed information per 20 AAC 25.071): 22. Re -Drill /Lateral Top Window MD/TVD: MWD, LWD / FE, GR, DLL, CNL, BHC, SP, MLL, CAL, CDL 10115' 8489' 23. CASING, LINER AND CEMENTING RECORD SETTING DEPTH MD SETTING DEPTH TVD HOLE AMOUNT CASING WT. PER FT. GRADE To BOTTOM To BOTTOM SIZE CEMENTING RECORD PULLED 20" x 30" Insulated Conductor Surface 110' Surface 110' 36" 8 cu vds Concrete 13 -3/8" 72# L -80 Surface 2678' Surface 2678' _ 17 -1/2" 3720 cu ft Permafrost 9 -5/8" 47# L -80 Surface 10082' Surface 8465' 12 -1/4" 2198 cu ft Class 'G' 7" 26# L -80 9781' 10115' 8243' 8489' 8-1/2" 330 cu ft Class 'G' 4-1/2" 12.6# 13Cr80 9635' 11415' 8136' 9073' 6" 255 cu ft Class 'G' 24. Open to production or injection? ❑ Yes ►_ No 25. TUBING RECORD If Yes, list each interval open SIZE DEPTH SET (MD) PACKER SET (MD / TVD) (MD +TVD of Top & Bottom; Perforation Size and Number): 4-1/2", 12.6#, 13Cr80 9492' 9405' / 7968' MD TVD MD TVD 4 -1/2 ", 12.6 #, L -80 9566' - 9626' 9566' / 8085' 26. ACID, FRACTURE, CEMENT SQUEEZE, ETC. SCANNED FEB 2 6 20 DEPTH TER Set Whip AL (MD)s AND KIND OF MATERIAL USED 10240' 27. PRODUCTION TEST Date First Production: Method of Operation (Flowing, Gas Lift, etc.): Not on Production N/A Date of Test: Hours Tested: Production For OIL -BBL: GAS -MCF: WATER -BBL: CHOKE SIZE: GAS -OIL RATIO: Test Period Flow Tubing Casing Press: Calculated OIL -BBL: GAS -MCF: WATER -BBL: OIL GRAVITY -API (CORR): Press. 24 -Hour Rate 28. CORE DATA Conventional Core(s) Acquired? ❑ Yes ® No Sidewall Core(s) Acquired? ❑ Yes ® No If Yes to either question, list formations and intervals cored (MD +TVD of top and bottom of each), and summarize lithology and presence of oil, gas or water (submit separate sheets with this form, if needed). Submit detailed descriptions, core chips, photographs and laboratory analytical results per 20 AAC 250.071. None RE3CMS OCT 2 4 2011 Form 10-407 Revised 12/2009 CONTINUED ON REVERSE % d(. i „s e f fi *mit Original Onl . 29. GEOLOGIC MARKERS (List all formations amaarkers encountered): 30. FORMATION TESTS NAME glIND TVD Well Tested? Yes ® No Permafrost Top If yes, list intervals and formations tested, briefly summarizing test Permafrost Base results. Attach separate sheets to this form, if needed, and submit detailed test information per 20 AAC 25.071. Sag River 10094' 8474' None Shublik 10134' 8503' Sadlerochit 10230' 8581' Formation at Total Depth (Name): 31. List of Attachments: Summary of Pre -Rig Work, Summary of Daily Drilling Reports, Well Schematic Diagram 32. I hereby certify that th fore ing is u- - ' el to the best of my knowledge. Signed: Joe Lastufka i : Drilling Technologist Date: 10iab 1 PBU B - 27A 196 - 101 312 -342 Prepared By Name/Number: Joe Lastufka, 564 -4091 Well Number Permit No. / Approval No. Drilling Engineer: Matt Ross, 564 -5782 INSTRUCTIONS General: This form is designed for submitting a complete and correct well completion report and log on all types of lands and leases in Alaska. Submit a well schematic diagram with each 10-407 well completion report and 10-404 well sundry report when the downhole well design is changed. Item la: Classification of Service Wells: Gas Injection, Water Injection, Water - Alternating -Gas Injection, Salt Water Disposal, Water Supply for Injection, Observation, or Other. Multiple completion is defined as a well producing from more than one pool with production from each pool completely segregated. Each segregated pool is a completion. Item 4b: TPI (Top of Producing Interval). Item 8: The Kelly Bushing and Ground Level elevation in feet above mean sea level. Use same as reference for depth measurements given in other spaces on this form and in any attachments. Item 13: The API number reported to AOGCC must be 14 digits (ex: 50- 029 - 20123- 00 -00). Item 20: Report true vertical thickness of permafrost in Box 20. Provide MD and TVD for the top and base of permafrost in Box 28. Item 23: Attached supplemental records for this well should show the details of any multiple stage cementing and the location of the cementing tool. Item 24: If this well is completed for separate production from more than one interval (multiple completion), so state in item 1, and in item 23 show the producing intervals for only the interval reported in item 26. (Submit a separate form for each additional interval to be separately produced, showing the data pertinent to such interval). Item 27: Method of Operation: Flowing, Gas Lift, Rod Pump, Hydraulic Pump, Submersible, Water Injection, Gas Injection, Shut -In, or Other (explain). Item 28: Provide a listing of intervals cored and the corresponding formations, and a brief description in this box. Submit detailed description and analytical laboratory information required by 20 AAC 25.071. Item 30: Provide a listing of intervals tested and the corresponding formation, and a brief summary in this box. Submit detailed test and analytical laboratory information required by 20 AAC 25.071. Form 10-407 Revised 12/2009 Submit Original Only • . • B -27A, Well History (Pre Rig Sidetrack) Date Summary 09/09/12 T /I /0= 2275/120/0 Conducted PJSM. Performed bleed off tests (LTT) on Swab, SSV, Wing and Master valves. All Pass. Used Swab & SSV as barriers, PT'd thru needle valve 3500 psi. 5 /min.. pass. Removed tree cap, attached lubricator w/ TWC, PT'd 250 /low.. 3500 /high..5 min. pass (see chart in TRP folder) Set 4" CIW "H" TWC #286 using 1 -1' ext. Tagged @ 111 ". Bled tree to 0 psi., shut barriers, removed lubricator , C/O tools, re- attached lubricator, pt'd 250 /Iow..3500 /high..5 min. pass. Opened all valves, ensured 0 psi. on tree, torqued all flanges to specs.(see log)Shel1 tested tree against TWC 250 /Iow..5000 /high 5 min. pass.(see chart in TRP folder) RETRIEVED 4" CIW TWC. Installed tree cap w/ new 0 -ring, PT'd to 500 psi. /5 min. pass. 09/13/12 DRIFT TBG W/ 3.70" x 20' DUMMY WHIPSTOCK DRIFT TO 10,512' SLM. TARGET DEPTH = 10,300' SLM. 09/18/12 INITIALT /I /0 = 2500/175/50. RIH WITH HEAD (5X3 WP, 1.38 FN)/WELLTEC MILL WITH WRD. SPECIFICATIONS: OAL = 36' / OAW = 480# / MAX OD = 3.80" AT THE BIT / CCL TO BOTTOM = 26.0'. MILL XN NIPPLE AT 9614'. BIT OD = 3.81" WITH SHAVINGS ON THE BIT. PIECES OF SHAVING WERE COLLECTED. RIH. HEAD /ERS /SWIVEL/WPPT/WPGR TEMP PRESS /BAKER 10/WHIPSTOCK. LENGTH: 54' OD: 3.70" WEIGHT: 540 # FN: 1.38 ". 09/18/12 T /I /0= 2400/180/0 Temp =SI Assist E -line (Load & Kill) ( Pre CTD) Pumped 3 bbls meth spear followed by 245 bbls 110* 1% KCL down TBG. Pumped 3 bbls meth spacer and 40 bbls 50* diesel down TBG to freeze protect. 09/19/12 UNABLE TO GET WHIPSTOCK ORIENTATION TO 78 DEG. MULTIPLE TRIES TO ORIENTATE WHIPSTOCK BELOW AND PULL INTO CORRECT DEPTH /ORIENTATION. POOH WITHOUT SETTING WHIPSTOCK. WELL LEFT SI ON DEPARTURE. FINAL T /I /0 = 0/150/0. Page 1 of 1 0 • • Common Well Name: B -27 AFE No Event Type: RE- ENTER- ONSHORE (RON) Start Date: 9/23/2012 End Date: 9/30/2012 X3- 012GV- C:DRILL (2,417,200.00 ) Project: Prudhoe Bay Site: PB B Pad Rig Name /No.: NORDIC 1 Spud Date/Time: 7/24/2008 12:00:00AM Rig Release: 10/5/2012 Rig Contractor: NORDIC CALISTA UWI: Lat: 70 °16'12.591N° Long: 148 °40'24.105 Active Datum: Orig Rig On B -27A ©75.40ft (above Mean Sea Level) Date From - To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (ft) 9/23/2012 21:30 - 23:30 2.00 MOB P PRE CONTINUE WITH PREPARATION TO MOVE OFF WELL. TOURPUSHER AND DRILLER CONDUCT ONE LAST ROUTE DRIVE BEFORE PJSM ON RIG MOVE. WARM UP MOVING SYSTEM. PJSM ON RIG MOVE, ASSIGNMENTS. PULL OFF OF C-24 WITH NO ISSUES. STAGE RIG, WAIT ON SECURITY. 23:30 - 00:00 0.50 MOB P Mai WAIT ON SECURITY 9/24/2012 00:00 - 04:15 4.25 MOB P PRE MOVE RIG FROM C -PAD TO B -PAD 04:15 - 12:00 7.75 MOB P PRE STAGE RIG AT EDGE OF. PAD WHILE PAD PREP IS COMPLETED AROUND B-27. WAIT ON PAD PREP & FLOW LINE FREEZE ' PROTECT 12:00 - 13:00 1.00 MOB P PRE VERIFY ALL PRESSURE ARE BLED OFF IA SHOWING 150 PS 'WITH VALVE CLOSED AND WHITEY VALVE OPEN ' REPLACED BAD GAUGE ON IA AND IS NOW BEARLY READING ANY PRESSURE I CLOSE ALL VALVES ON TREE AND SPOT RIG OVER WELL PJSM WITH NEW CREW MEMBER TO SPOT _ G�OVER WELL 13:00 - 13:30 0.5Q _ MOB P 11111111111111M POT RIG OVER WELL i ACCEPT RIG AT 1330 -HRS. 13:30 - 14:00 0.5'0 MOB Wil ®11.1111 LEVEL RIG 14:00 - 17:30 3.50 MOB P PRE NORDIC CREW CHANGE, BEGING RU 17:30 - 18:00 0.50 BOPSUR PRE FLUID PACK STACK FOR VISUAL LEAKS - INSTALL HOT TUB AROUND LUBRRICATOR LOU GRIMALDI WAIVED WITHNESSING TEST ON 9/23/2012 14:25 18:00 - 00:00 6.00 BOPSUR P 111 PRE START TESTING BOPE. SHELL TEST GOOD. (UNCTION RAMS FROM REMOTE CONSOLE IN COIL OPERATIONS CAB. TOURPUSHER AND WSL WITNESS TEST. 9/25/2012 00:00 - 03:15 3.25 BOPSUR P PRE BOP TEST. TOURPUSHER AND WSL ON SITE e , , i o t, TO WITNESS TEST. STAB ON, PRESSURE TEST QUICK TEST SUB, INNER REEL VALVE AND PACKOFFS. 03:15 - 04:00 0.75 BOPSUR P PRE RIG EVACUATION DRILL. SIMULATE H2S ON THE RIG FLOOR. DRILLER AND COIL OPERATOR SIMULATE CLOSING IN WELL. CREW RESONSE TIME 2 MIN 30 SEC TO MUSTER AREA. DISCUSS ACTIONS UPON MEETING AT MUSTER AREA DURING AAR. ONCE COMPLETE, CONDUCT PRE -SPUD MEETING WITH CREW. 04:00 - 06:50 2.83 BOPSUR P PRE PJSM ON FUNCTIONING AND TESTING THE MANUAL LOCKDOWNS. FUNCTION AND PRESSURE TEST MANUAL LOCKDOWNS WITH COIL TUBING IN THE BOP STACK. 06:50 - 08:30 1.67 BOPSUR P PRE ALL RAMS TESTED WITH MANUAL LOC DOWNS AND KOOMEY PRESSURE BLED OFF. TAG UP AND REMOVE INJECTOR TO TEST BLINDS WITH MANUAL LOCKS 08:30 - 09:00 0.50 BOPSUR P PRE RIG EVACUATION DRILL Printed 10/8/2012 1:42:35PM Common Well Name: B -27 AFE No Event Type: RE- ENTER- ONSHORE (RON) Start Date: 9/23/2012 End Date: 9/30/2012 X3- 012GV- C:DRILL (2,417,200.00 ) Project: Prudhoe Bay Site: PB B Pad Rig Name /No.: NORDIC 1 Spud Date/Time: 7/24/2008 12:00:00AM Rig Release: 10/5/2012 Rig Contractor: NORDIC CALISTA UWI: Lat: 70 °16'12.591N Long: 148 °40'24.10<. Active Datum: Orig Rig On B -27A @75.40ft (above Mean Sea Level) Date From - To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (ft) 09:00 - 09:25 0.42 BOPSUR P PRE PJSM TO CUT COIL THEN PUMP SLACK AND CUT COIL AGAIN THERE IS A WEAR SPOT THAT CTS WOULD LIKE TO MOVE AND IT IS MORE THAN WHAT THEY WILL BEABLE TO PUMP DURING SLACK MANAGEMENT CUT 100' OF COIL AND WIRE 09:25 - 09:40 0.25 BOPSUR P PRE SEAL END OF WIRE AND PUMP SLACK 09:40 - 11:00 1.33 BOPSUR P PRE PU INJECTOR AND CUT COIL TO FIND WIRE 11:00 - 16:00 5.00 BOPSUR P PRE CUT COIL TO EQUAL 2% SLACK AND NO WIRE, STAB ON TO PUMP STACK FORWARD AND TEST LUBRICATOR & QTS CONNECTION 16:00 - 17:00 1.00 BOPSUR P PRE HOLD PJSM ON TESTING LUBRICATOR & PULLING TWC. TEST LUBRICATOR TO 250 -PSI / 3500 -PSI. HOLD AND CHART EACH TEST FOR 5- MINUTES TO MEET "TEMPORARY PIPEWORK" TESTING CRITERIA. 17:00 - 17:45 0.75 BOPSUR P PRE OPEN SWAB, MASTER & SSV. LUBRICATE OUT TWC. WELL SHOWS 0 -PSI ON GAUGE & IS ON A VAC. CLOSE SWAB, MASTER & SSV. CONFIRM _LEAK TIGHT BARRIERS WITH 0 -PSI ON WELL AS PER WELL PROGRAM. LD LUBRICATOR & TWC. 17:45 - 18:45 1.00 BOPSUR P PRE MU NIGHT CAP & RU TO PRESSURE TEST. 18:45 - 19:15 0.50 BOPSUR P PRE PJSM ON WELL KILL. LINE UP FLUIDS. DOUBLE CHECK VALVE ALIGNMENT. OPEN UP TO WELL, NO PRESSURE. 19:15 - 20:30 1.25 BOPSUR P PRE SEND 5 BBLS METHANOL AHEAD. BEGIN 1% KCL DOWN HOLE AT 4.6 BPM, 1180 PSI INITIAL CIRCULATING PRESSURE. POSITIVE WELLHEAD PRESSURE AT 11 BBLS. MAINTAIN 4.6 -4.7 BPM RATE. AT 50 BBLS AWAY, 2275 PSI CIRCULATING PRESSURE AND 2040 PSI WELLHEAD PRESSURE. AT 100 BBLS AWAY, 2445 PSI CIRCULATING PRESSURE, 2215 PSI WELLHEAD PRESSURE. FINAL WELLHEAD PRESSURE ON KCL AT 2190 PSI. BEGIN PUMPING 8.6 PPG MUD. WELLHEAD PRESSURE DROPPED AS MUD IS GOING DOWNHOLE. 50 BBLS AWAY, WELLHEAD PRESSURE 2085 PSI. 100 BBLS AWAY, 2080 PSI WELLHEAD PRESSURE AT 4.6 BPM, 2300 PSI CIRCULATING PRESSURE. 150 BBLS AWAY, 2060 PSI WELLHEAD PRESSURE. FINAL WELLHEAD PRESSURE WITH 180 BBLS 8.6 PPG MUD AWAY AT 4.6 BPM IS 2050 PSI. DOWN ON PUMPS. PRESSURE FELL OFF RAPIDLY. NO PRESSURE BUILD UP WITH CLOSED CHOKE. 20:30 - 21:30 1.00 BOPSUR P PRE OPEN CHOKE. WELL ON SLIGHT VACUUM. FLOW CHECK WELL FOR 30 MINUTES. MOBILIZE WHIPSTOCK TOOLS TO RIG FLOOR. FLOW CHECK GOOD, TOOK 6 BBLS TO GET RETURNS (5 BPH LOSSES) 21:30 - 22:45 1.25 STWHIP P WEXIT PJSM ON MU OF WHIPSTOCK BHA. MU BHA: 45 KB WHIPSTOCK PACKER WITH PIP TAG, BAKER INTEQ TOOLS. STAB ON, PRESSURE TEST QUICK TEST SUB. OPEN EDC. Printed 10/8/2012 1:42:35PM ry Common Well Name: B -27 AFE No Event Type: RE- ENTER- ONSHORE (RON) Start Date: 9/23/2012 End Date: 9/30/2012 X3 012GV- C:DRILL (2,417,200.00 ) Project: Prudhoe Bay Site: PB B Pad Rig Name /No.: NORDIC 1 Spud Date/Time: 7/24/2008 12:00:00AM Rig Release: 10/5/2012 Rig Contractor: NORDIC CALISTA UWI: Lat: 70°16'12.591N° Long: 148 °40'24.10E Active Datum: Orig Rig On B -27A @75.40ft (above Mean Sea Level) Date From - To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) ft 22:45 23:30 0.75 STWHIP P WEXIT BREAK CIRCULATION, OBTAIN RETURNS AFTER 2 BBLS. CIRCULATE AT HIGH RATE TO PUMP E -LINE SLACK FORWARD AND FLUSH FRESH WATER OUT OF COIL. 23:30 - 00:00 0.50 STWHIP P WEXIT RIH WITH WHIPSTOCK ASSEMBLY. 9/26/2012 00:00 - 02:10 2.17 STWHIP P . WEXIT CONTINUE TO RIH WITH 4-1 /2" MONOBORE ACKER WHIPSTOCK TO 10090' 02:10 - 02:50 0.67 STWHIP P 00 TIE IN FROM 10090' TO 10183'. C RIRECTION -2'. 02:50 - 03:00 0.17 STWHIP R P H TO 10420' 03:00 03:40 0.67 STWHIP P WEXIT LOG UP CCL FROM 10420' 0HR 9860'. RIH! TO WHIPSTOCK PACKER SETTING G DEPTH Le SAS AT2.5 TO 3- BBL/HR 03:40 - 04:30 0.83 STWHIP P WEXIT VERIFY SETTING DEPTH AND SET W I"PSTOCK PACKER AT 10240' WITH 78 -DEG RIGHT ORIENTATION. STACKED WEIGHT TO CONFIRM F TO STACW A C R W EIGHT SET. WHILE IINARI PUSHING ASSEMBLY K DON T 10,264'. MAKE SECOND ATTEMPT, STILL NO WOB WHILE PUSHING TO 10,271'. CALL ODE, FIELD SUPERINTENDENT. DECIDE TO PUSH H ORDER SETTING DOWN DEPTH FURTER FOR IN SECOND TO ATTE MPT WITH NEW WHIPSTOCK ASSEMBLY. 04:30 - 06:30 2.06 STWHI'P - WEXIT PUSH WHIPSTOCK ASSEMBLY DOWN TO 10,450'. O CHE PO PICK UP NEW WHIPSTOCK FLW ASSE M BLY T 06:30 06:45 0.25 STWHIP N DFAL ' ~ WEXIT FLOW CHECK WELL AT 200'. NO FLOW. 06:45 07:15 0.50 STWHIP— DEAL WEXIT ESTABLISH CIRCULATION AT .3 -BPM / 600 -PSI. NEGLIGIBLE LOSS RATE. WAIT FOR BAKER THRU TUBING REP TO RETURN TO LOCATION TO LD RUNNING TOOLS. 07 :15 - 08:00 0.75 STWHIP N DFAL WEXIT HOLD PJSM WHIPSTOCK RUNNING TOOLS. DISCUSS ON LD POSITIONS OF PEOPLE, HANDLING CONSIDERATIONS & WELL CONDITIONS. LD BHI TOOLS & BTT RUNNING TOOLS - NO ISSUES OR ANOMALIES NOTED. LOAD OUT BTT TOOLS FOR RETURN TO SHOP. 08:00 - 09 :15 1.25 STWHIP N DFAL WEXIT WAIT ON BTT TO COMPLETE INSPECTION V / AND ASSEMBLY OF 4 -1" MONOBORE PACKER WHIPSTOCK & RUNNING TOOLS. 09:15 - 09:45 0.50 STWHIP N DFAL WEXIT BRING WHIPSTOCK & RUNNING TOOLS TO RIG FLOOR. BTT REP MU RUNNING TOOL TO WHIPSTOCK & INSPECT. IA I OA = 20 -PSI / 180 -PSI. 09:45 10:15 0.50 STWHIP N DFAL WEXIT HOLD PJSM ON MU 4 -1 //22 " KB PACKER WHIPSTOCK BHA. PU WHIPSTOCK, RUNNING TOOLS & MU BHI TOOLS. PU INJECTOR, MU COIL TO BHA & STAB ON WELL Printed 10/8/2012 1:42:35PM Common Well Name: B -27 AFE No Event Type: RE- ENTER- ONSHORE (RON) Start Date: 9/23/2012 End Date: 9/30/2012 X3- 012GV- C:DRILL (2,417,200.00 ) Project: Prudhoe Bay Site: PB B Pad Rig Name /No.: NORDIC 1 Spud Date/Time: 7/24/2008 12:00:00AM Rig Release: 10/5/2012 Rig Contractor: NORDIC CALISTA UWI: Lat: 70 °16'12.591N Long: 148 °40'24.10<. Active Datum: Orig Rig On B -27A @75.40ft (above Mean Sea Level) Date From - To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (ft) 10:15 - 10:35 0.33 STWHIP N DFAL WEXIT TEST QTS TO 250 -PSI / 3500 -PSI. HOLD AND CHART EACH TEST FOR 5- MINUTES. PASS TEST. OPEN EDC & ESTABLISH CIRCULATION AT .25 -BPM / 570 -PSI. 10:35 - 12:30 1.92 STWHIP N WEXIT RIH AT 100 -FT /MIN. ORIENT WHIPSTOCK TO 78 -DEG RIGHT. START: PVT= 248 -BBLS, INMM = 24 -BBLS /MIN, OUTMM = .47- BBLS/MIN END: PVT= 297 -BBLS, INMM = 23 - BBLS/MIN, OUTMM = .43- BBLS/MIN 12:30 - 14:50 2.33 STWHIP N DFAL WEXIT LOG PRIMARY GR TIE IN FROM 10,090' TO 10,300' AT 100 -FP14. APPLY MINUS 1.5' CORRECTION. CIRCULATE AT .22 -BPM/ 800 -PSI. IA / OA = 90- PSI / 195 -PSI. 14:50 - 15:00 0.17 STWHIP N DFAL WEXIT POH TO 10,200'. 15:00 - 15:15 0.25 STWHIP N DFAL WEXIT LOG CCL DOWN FROM 10,200' TO 10,340' AT 1000 -FPH. POH TO 10,240'. CIRCULATE AT .4 -BPM / 890 -PSI. iA/ OA= 115- PSI /210 -PSI. 15:15 - 15:45 0.50 STWHIP N DFAL WEXIT POSITION WHIPSTOCK WITH TOP AT 10,240' - (BOTTOM AT 1 0,255.6') AND ORIENTED TO 78 -DEG ROHS. ASSESS CCL LOG AND DECIDE TO SET WHIPSTOCK 2' DEEPER FOR CENTRALIZER AVOIDANCE. GET APPROVAL FROM ASSET GEO AND ODE. RIH TO PUT TOP OF WS AT 10,242' (BOTTOM AT 10,257.6'), ORIENTED TO 78 -DEG ROHS. SHUT DOWN PUMP AND CLOSE EDC. PRESSURE UP AND SEE SHEAR AT 2400 -PSI. SET DOWN 4K -LBS TO CONFIRM WHIPSTOCK, SET. — PUTO 10,240' AND FLOW CHECK WELL - NO FLOW. 15:45 - 17:45 2.00 STWHIP P WEXIT POH WITH WHIPSTOCK RUNNING TOOLS. CIRCULATE AT .85 -BPM / 1015 -PSI. IA / OA = 130-PSI/215-PSI. 17:45 - 18:00 0.25 STWHIP P WEXIT FLOW CHECK WELL AT 200'. NO FLOW. 18:00 - 18:30 0.50 STWHIP P WEXIT PERFORM CREW CHANGE AND PRE TOUR CHECKS. CIRCULATE ACROSS THE TOP OF THE WELL AT .5 -BPM / 660 -PSI. IA / OA = 140 -PSI / 255 -PSI. DRIPS NOTICED AT WEEP HOLE OF REEL SWIVEL DURING INSPECTION; WILL CHANGE OUT AFTER CREW CHANGE 18:30 - 19:15 0.75 STWHIP P WEXIT LD WHIPSTOCK RUNNING BHA. ALL TOOLS RETRIEVED AND IN GOOD CONDITION. OFF LOAD TOOLS FROM RIG. LINE OUT TOOLS TO SWAP OUT REEL SWIVEL. 19:15 - 20:00 0.75 STWHIP P WEXIT CHANGE OUT REEL SWIVEL 20:00 - 21:15 1.25 STWHIP P WEXIT PJSM ON MAKING UP MILLING ASSEMBLY, MU ASSEMBLY PER BAKER REP: 3.80" MILL, 2 -7/8" STRAIGHT MOTOR, BHI TOOLS. MILL GAUGED AT 3.79" NO -BO, 3.80" GO. PRESSURE TEST QUICK TEST SUB. Printed 10/8/2012 1:42:35PM o o rr /ir Common Well Name: B -27 AFE No Event Type: RE- ENTER- ONSHORE (RON) Start Date: 9/23/2012 End Date: 9/30/2012 X3- 012GV- C:DRILL (2,417,200.00 ) Project: Prudhoe Bay Site: PB B Pad Rig Name /No.: NORDIC 1 Spud Date/Time: 7/24/2008 12:00:00AM Rig Release: 10/5/2012 Rig Contractor: NORDIC CALISTA UWI: Lat: 70°16'12.591N° Long: 148 °40'24.10E Active Datum: Orig Rig On B -27A @75.40ft (above Mean Sea Level) Date From - To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (ft) 21:15 - 23:45 2.50 STWHIP P WEXIT RIH WITH MILLING ASSEMBLY. LOG TIE -IN AT 10,170' WITH -1.5' CORRECTION. 23:45 - 00:00 0.25 STWHIP P WEXIT UNANNOUNCED KICK WHILE TRIPPING DRILL. ALL PERSONNEL REPORTED TO STATIONS. SIMULATE FLOW AFTER PUMPS SHUT DOWN. REACT ACCORDING TO STANDING ORDERS: INCREASE PACKOFF PRESSURE ON COIL, SHUT HCR, SHUT CHOKE. 9/27/2012 00:00 - 00:30 0.50 STWHIP P WEXIT . AAR ON KICK DRILL. DISCUSS REACTION. USE AAR AS TRAINING WALK THROUGH FOR NEW ROUSTABOUT TO DISCUSS MONITORING FOR FLOW, WHEN TO TAKE SHUT-IN READINGS, IMPORTANCE OF COMMUNICATION FROM ACCUMULATOR AND CELLAR. 00:30 - 02:30 2.00 STWHIP P WEXIT RUN DOWN TO WHIPSTOCK DEPTH OF -210 10,200'. OBTAIN SLOW PUMP RATES. SLOWLY RIHIAND DRY TAG WHIPSTOCK. AT 10,240'. PU, COME ON WITH PUMPS AND RE -TAG. BEGIN MILLING OPERATIONS AT 10240.8' COIL TUBING DEPTH. ONE FOR ONE - RETURNS, MW IN AND OUT 8.6 PPG. TIME MILL FIRST FOOT TO 10,241.9' AT 2.7 BPM, 2425 PSI, .4 -2.35 WOB 02:30 - 06:00 3.50 STWHIP P WEXIT BEGIN MILLING WITH WOB AND DIFFERENTIAL PRESSURE PARAMETERS. NO FLUID LOSSES, MW IN AND OUT 8.6 PPG. MILL AT 2.7 BPM, 2400 PSI INITIAL CIRCULATING PRESSURE. - MILL KEEPING 3.7 -4.6K WOB AND 2500 -2625 PSI DURING MILLING OPS - SLOW ROP MAY BE ATTRIBUTED TO CHROME TUBING 06:00 - 11:00 5.00 STWHIP P WEXIT CONTINUE TO MILL WINDOW FROM 10,243.8' MAINTAINING ABOVE PARAMETERS. SLOW ROP CONTINUES, STEADILY IMPROVING PAST 10,244'. SEE PILOT MILL EXIT AT 10,247.6' WITH RAPID DROP OFF IN DHWOB. MAINTAN 2.5 - 3K -LBS DHWOB PAST 10,247.6'. TIME MILL AT 1 -FPH FROM 10,248.5' TO ENSURE STRING REAMER EXITS SMOOTHLY. MILL TO 10,248.9' MW IN / OUT = 8.6 -PPG. BLEED OA FROM 900 -PSI TO 330 -PSI. ALL CRUDE BLEED IA FROM 800 -PSI TO 200 -PSI. ALL CRUDE 11:00 - 12:30 1.50 STWHIP N RREP WEXIT PU TO 10,230'. SHUT DOWN PUMP & OPEN EDC. TAKE GEN #2 OFFLINE & REPLACE VOLTAGE REGULATOR. TEST RUN FOR 10- MINUTES WITHOUT ISSUE. CIRCULATE AT .4 -BPM / 850 -PSI (50% POWER USAGE) DURING GENERATOR WORK. ONCE DONE WITH GENERATOR WORK, SHUT DOWN PUMP & CLOSE EDC. Printed 10/8/2012 1:42:35PM �y F Common Well Name: B -27 AFE No Event Type: RE- ENTER- ONSHORE (RON) Start Date: 9/23/2012 End Date: 9/30/2012 X3- 012GV- C:DRILL (2,417,200.00 ) Project: Prudhoe Bay Site: PB B Pad Rig Name /No.: NORDIC 1 Spud Date/Time: 7/24/2008 12:00:00AM Rig Release: 10/5/2012 Rig Contractor: NORDIC CALISTA UWI: Lat: 70°16'12.591N° Long: 148 °40'24.10M Active Datum: Orig Rig On B -27A @75.40ft (above Mean Sea Level) Date From - To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (ft) 12:30 - 15:30 3.00 STWHIP P WEXIT ESTABLISH CIRCULATION AT 2.7 -BPM / 2350 -PSI. RIH SLOWLY TO RESUME MILLING AHEAD AT 10,248.9'. EASY MILLING WITH 500 -LBS DHWOB AND 100 - 250 -PSI MOTOR WORK - APPEAR TO BE IN FORMATION. MILL AHEAD AT 4 -FPH WITH 2.5K -LBS DHWOB AND 200 -PSI MOTOR WORK TO 10,259'. IA / OA / PVT = 300 -PSI / 500 -PSI / 326 -BBLS. 15:30 - 17:00 1.50 STWHIP P WEXIT MAKE 3X BACK- REAMING PASSES THROUGH WINDOW, SEE MINOR MOTOR WORK AT 10,241' ON FIRST PASS UP. NO OTHER ISSUES NOTED ON REAMING PASSES, CIRCULATE AT 2.6-BPM/ 2220 -PSI. GEO CONFIRMS 94 %.Z4 SAND IN SAMPLE FROM 10,259' DRY DRIFT WINDOW - NO ISSUES. FLOW CHECK WELL JUST ABOVE WINDOW NO FLOW. IA / OA / PVT = 490 -PSI / 650 -PSI / 326 -BBLS. 17:00 - 18:30 1.50 STWHIP P WEXIT` POH WITH WINDOW MILLING BHA. OPEN EDC & CIRCULATE AT 3.4 -BPM / 2400 -PSI. MW IN / OUT = 8.6 -PPG. IA / OA = 425 -PSI / 660 -PSI. FLOW CHECK WELL BELOW BHA. PJSM ON LAYING DOWN BHA. 18:30 - 19:30 1.00 STWHIP P WEXIT LAY DOWN BHA. WINDOW MILL AND STRING MILL BOTH NO-GO AT 3.78" AND GO AT 3.79 ". MOBILIZE MILLING BHA OFF OF RIG. 19:30 - 20:30 1.00 DRILL P PROD1 PJSM ON MAKING UP DRILLING BHA. MU BHA: 4.25" BI- CENTER BIT, 3 -1/8" ULTRA LOW SPEED MOTOR WITH 1.4° BEND, HOT, RESISTIVITY, BHI TOOLS. STB ON WITH INJECTOR, PRESSURE TEST QUICK TEST SUB. 20:30 - 23:30 3.00 DRILL P PROD1 RIH WITH DRILLING BHA. LOG TIE -IN WITH -5' CORRECTION. OBTAIN SLOW PUMP RATES. CONTINUE RIH. 23:30 - 00:00 0.50 DRILL P PROD1 DRILL AHEAD IN BUILD SECTION FROM 10,259'. 3.1 BPM, 3000 PSI, MW IN AND OUT 8.6 PPG. 9/28/2012 - DRILL P PROD1 DRILL AHEAD 00:00 - 05:30 5.50 DRILL P PROD1 DRILL AHEAD FROM 10,275'. FREE SPIN 2930 PSI AT 3.1 BPM. - 3.1 BPM, 2950 -3055 PSI, ECD 9.88 PPG, .81 -1.46K WOB, MW IN AND OUT 8.6 PPG 05:30 - 06:00 0.50 DRILL P PROD1 WIPER TRIP TO WINDOW. PULL INTO WINDOW AND TIE -IN WITH +1.5'. CONTINUE TO RIH TO LOG RA TAG. Printed 10/8/2012 1:42:35PM TREE= CIW • WE,U- EAD = FMC • SA NOTES: WELL ANGLE> 70° @ 10735' ACTUATOR BAKER C B _2 7 B " "• 4 -1/2" CHROME TBG & LNR` " . KB."ELEV = 81.92' PJC DRAFT BF. ELEV = 44.32' KOP= 2800' 2221' H4 -112' ITS X NP, D = 3.813" 1 Max Angle = 92° @ 10995' 1 GAS LIFE MANDRELS _ _ _. Datum MD= 10652' ST MD TVL) DEV TYPE VLV LATCH PORT [Wit Datum TVD = 8800' SS 4 3313 3304 15 MMG DMY RK 0 06/22/12 120" CONDUCTOR D = ? 1 110' 3 6184 5598 45 M DRAY RK 0 06/22/12 13 3/8 CSG, 72#, L -80, ID= 12.347' 267$' 2 8103 6989 42 MG OW FE 0 07/31/08 ' 1 1 9317 7903 43 NM DM' FE 0 07/31/08 1 9385' -14 -1/2" HES X NP, D = 3.813" Minimum ID = 2.36" @ 10186' 9405' H9-5/8" X4 112" BKR S 3 PKR D= 3.875' 4 -112" KB LINER TOP PACKER 1 9430' 1- 14- 1/2" HES X NP, D= 3.813" 4112" TBG, 12.6 #, 13CR 80 NSCT, 9490' I , _ 9492 H4 -1/2" WLEG, D= 3.958" .0152 bpf, ID = 3.958" 9566' -19-5/8" X 5-1/2" BKR S-3 PKR, ID= 4.75" 9572' --{5 -112" X 4 -1 /2" XO, D = 3.875" I 9593' 1-14 -1/2" HES X NP, D = 3.813" { I 9614' H14 -1/2" HES XN NP, MLLE') TO 3.80" (09/1W12) 1 4-112' TBG, 12.6 #, L -80 BTRS-M, H 9625' 1 9621• 1 - 19 - 518" X 8" BKR ZXPLTP, D= 7.50" 5k 0152 bpf, ID= 3.958' 9626' H4- 1 /2 " WLEG,D =4.0' 5635' 1-19 -518" X 7" BKR HMG LNR HGR, D = 6.188' 1TOP OF 7" LINER -1 9781' 1 J 9642' I X 5 -1/2" XO, ID = 4.813" 17" LNR, 26#, L -80 BTRS, .0383 bpf, D = 6.276" I-I 9791' --X 9644' 1-{5 -112" x 4 -112' x0, D = 3.958' 9781' H9-5/8" X 7" BOT LNR HGR, ID= ? 1 9 -5/8" CSG, 47 #, L -80, D = 8.681' -{ 10082' I-' , 17" BKR WHIPSTOCK ( ? ?/? ? /7 ?) H -10115 1_ 17" LNR 29#, L -80 BTRS, .0371 bpf, 13= 6.184" H -10115 1,-. 7" MLLOUT WINDOW (13-27A) 10115' 10160' 4 - 1/2" MONOBORE WHPSTOCK (09/26/12) --{ 10242' 10186' H4-1/2" KB LTP, ID = 2.36" (10/04112) 4 -1/2" LNR, 12.6#, 13CR -80 NSCT, - ^-10242 10204' 1 - 13.70' BTT GEN I DEPLOY SLV, ID = 3.00" .0152 bpf, ID = 3.958" 3.80" MLLOUT WINDOW (B - 27B) 10242' - 10248' PERFORATION SUMMARY REF LOG: SLB MEM CNU GR CCL ON ??? 1 102664' 1-I 3 -112" X 3 -3/16" XO, D = 2.786" 1 ANGLE AT TOP FERF:85° Q 11779' Note: Refer to Production DB for historical pert data SIZE SPF INTERVAL Opn /Sqz Si-OT SQZ 2" 6 11779 - 11850 0 10/03/12 2" 6 11905 - 11940 0 10/03/12 , 1. 3-1/2" LNR, 9.2 #, L -80 STL, .0087 bpf, ID = 2.992" -1 10254' 12003' H3-3/16" X 2 -7/8" XO, ID = 2.377" 1 13 -1/4' LNR, 6.60#, L -80 MI, .0079 bpf, D = 2.850' H 12003' 1 / 12 - 7/8" LNR, 6.50#, L STL, .0058 bpf, LD = 2.441" I-1 12051' 'P' R31a -1 12016' I' DATE REV BY COMMENTS DATE ' REV BY COM VENTS PRUDHOE BAY UNIT 12/16/85 AUDI #2 ORIGINAL COMPLETION 10/07/12 PJC PERFANGLE/ GLV TVDS WELL: B-27B 06/16/96 N18E RIG SIDETRACK(B -27A) PERMIT No: "2121370 08/01108. N4E5 RWO AR No: 50- 029 - 21471 -02 10/05/12 NORDIC 1 CM SIDETRACK (B -27B) SEC 31, T11 N, R14E, 496' FNL & 1595' Fa 10/05/12 PJC DRLG HO CORRECTION 10/06/12 PJC DRLG DRAFT CORRECTION I BP Exploration (Alaska) w \ j�� s THE STATE Alaska Oil and Gas ham` ^s � �'� °fALAS� Conservation Commission GOVERNOR SEAN PARNELL 333 West Seventh Avenue Anchorage, Alaska 99501 -3572 ALAS'" Main: 907.279.1433 Fax: 907.276.7542 John McMullen Engineering Team Leader 10-01 BP Exploration Alaska P (Alaska), Inc. P.O. Box 196612 Anchorage, AK 99519 -6612 Re: Prudhoe Bay Field, Prudhoe Bay Oil Pool, PBU B -27A Sundry Number: 312 -342 Dear Mr. McMullen: Enclosed is the approved Application for Sundry Approval relating to the above referenced well. Please note the conditions of approval set out in the enclosed form. As provided in AS 31.05.080, within 20 days after written notice of this decision, or such further time as the Commission grants for good cause shown, a person affected by it may file with the Commission an application for reconsideration. A request for reconsideration is considered timely if it is received by 4:30 PM on the 23rd day following the date of this letter, or the next working day if the 23rd day falls on a holiday or weekend. Sincerely, /0 Cathy P/ Foerster Chair DATED this 2S day of September, 2012. Encl. . 4191041 �.1v • a,L STATE OF ALASKA ® • ALASKA OIL AND GAS CONSERVATION COYMMISSION '4 .. 4 APPLICATION FOR SUNDRY APPROVAL SEP Q 6 2012 20 AAC 25.280 1. Type of Request: AC1 UG ❑ Abandon ® Plug for Redrill r ❑ Perforate New Pool ❑ Repair Well ❑ Change Approved Program ❑ Suspend ❑ Plug Perforations ❑ Perforate ❑ Pull Tubing ❑ Time Extension ❑ Operations Shutdown ❑ Re -Enter Suspended Well ❑ Stimulate ❑ Alter Casing ❑ Other 2. Operator Name: 4. Current Well Class: 5. Permit To Drill Number BP Exploration (Alaska) Inc. ® Development ❑ Exploratory 196401 • 3. Address: ❑ Service ❑ Stratigraphic 6. API Number.: P.O. Box 196612, Anchorage, Alaska 99519 -6612 50- 029 - 21471 -01-00 • 7. If perforating, closest approach in pool(s) opened by this operation to nearest 8. Well Name and Number: property line where ownership or landownership changes: PBU B -27A • Spacing Exception Required? ❑ Yes ® No 9. Property Designation: 10. Field / Pool(s): ADL 028310 • Prudhoe Bay Field / Prudhoe Bay Oil Pool • 11. PRESENT WELL CONDITION SUMMARY Total Depth MD (ft): Total Depth TVD (ft): Effective Depth MD (ft): Effective Depth TVD (ft): Plugs (measured): Junk (measured): 11415' ' 9073' • _ 11370' 9066' None 11001' Casing Length Size MD TVD Burst Collapse Structural Conductor 110' 20" x 30" 110' 110' Surface 2678' 13 -3/8" 2678' 2678' 4930 2670 Intermediate 10082' 9 -5/8" 10082' 8465' 6870 4760 Production Liner 334' 7" 9781' - 10115' 8243' - 8489' 7240 5410 Liner 1780' 4 -1/2" 9621' - 11415' 8126' - 9073' 8430 7500 Perforation Depth MD (ft): Perforation Depth TVD (ft): Tubing Size: Tubing Grade: Tubing MD (ft): 10789' - 11360' 8969' - 9064' 4 -1/2 ", 12.6# 13Cr -80 / L -80 9492' / 9566' - 9626' Packers and SSSV Type: 9 -5/8" x 4 -1/2 ", Baker S -3 Packer, Packers and SSSV 9405' 17968' 9 -5/8" x 5 -1/2 ", Baker SAB -3 Packer MD (ft) and TVD (ft): 9566' / 8085' 12. Attachments: 13. Well Class after proposed work: ® Description Summary of Proposal ® BOP Sketch - ❑ Detailed Operations Program ❑ Exploratory ® Development ❑ Service ❑ Str 14. Estimated Date for 15. Well Status after proposed work: Commencing Operations: October 1, 2012 ❑ Oil ❑ WINJ ❑ WDSPL ❑ Plugged 16. Verbal Approval: Date: 1402.- ❑ Gas ❑ GINJ ❑ GSTOR ❑ Abandoned • Commission Representative: „ a , �tL ❑WAG ❑ SPLUG El Suspended (7 S 17. I hereby certify that the foregoing is true and correct to the best of my knowledge. Contact Matt Ross, 564 -5782 • Printed Name J•hn M Mull-n , Title Engineering Team Leader Prepared By Name /Number; Signature i AO/ Phone 564 - 4711 Date ? 2 Joe Lastufka, 564 -4091 Commission Use Only f Condit. - of approval: Notify Commission so that a representative may witness 3 1 2 �� �/ Sundry Number. J ❑ Plug Integrity �p t30P Test ❑ Mechanical Integrity Test ❑ Location Clearance ,K 3Soo fsg. 80P 5/-- AA<•I Other: 4. / Or2 r - t`i'f1I_ZS. 0•(' 4- / 4-14ex. , --- f i 'D i Subsequent Form Required: ,O 7 APPROVED q Approved By: -- 'L -_ COMMISSIONER THE COMMISSION SSS ION Date / " 2-c- � Z F atymge 1 Submit In Duplicate �1{� J�tll'' � 711/ ORIGINAL \ if • To: Alaska Oil & Gas Conservation Commission bp From: Matthew Ross CTD Engineer Date: August 30, 2012 Re: B -27A Sundry Approval Sundry approval is requested to plug the B -27A perforations as part of drilling the B -27B coiled tubing sidetrack. History of B -27A. Well B -27A was drilled as a rotary ST completed in June 1996 in the 23P sand. The well came online but quickly struggled. In July 1996, 60' of adperfs were shot in the 22P sand. The well flowed for about 9 mos until the oil rate declined, and then adperfs were shot in the 24P.15' in the 25P were shot in Nov 1997. The well produced fulltime with declining production for several years. The 23P perfs were re -shot in April 2000, and the production slightly increased for —6 mos before starting to decline. In 2006 it was shut -in for TxIA comm and remained offline until a RWO restored integrity in Aug 2008. In mid 2011 B -27A was shut -in for high GOR. After reviewing the STPs from 1999- 2009 and offset production, an increase in gas production from the 25P was identified and that the 23P pert interval may have scale. During the GSO wellwork job in Dec 2011, a tractor with a CIBP got stuck in the liner at —11000' in scale. B -27A is currently shut -in for high GOR. Reason for sidetrack. B -27A is no longer a competitive well due to high GOR. The proposed sidetrack will access a target in Zone 2A & 2B. Proposed plan for B -27B is to drill a through tubing sidetrack with a Coiled Tubing Drilling rig on or around October 15 2012. The existing perforations will be isolated by a 4 -1/2" packer whipstock. The sidetrack, B -27B, will exit the existing 4 -1/2" liner and kick off in Zone 4 and land in Zone 2B & 2A. This sidetrack will be completed with a 3 -1/4" liner in the production interval. The following describes the work planned and is submitted as an attachment to Form 10 -403. A schematic diagram of the proposed sidetrack is attached for reference. We /i u 'r4 6o' 0 y s Y' 114 :/< Co n Q Q `AP Art. Gec 30 11"11-1 Love [/S on 'flit t fad (roJcc e „sec I I M; t-� irn G r % rf cvt"r a ficri`oi,ft f‘e_A �tll`fid'� Ao4C focc, wok 5 ;rye cove'b 7iv A erV„ • • • Pre -Rig Work: (scheduled to begin October 1 j 1. S Drift for 4W monobore whipstock to 10,340' md. L� y+l'i''�` - ) 2. E Set 4W monobore whipstock at 10,240' md. CPk "'�� 3. E Mill XN profile at 9,614' and to 3.80 ". 4. F Pressure test tubing to 2400psi. 5. V PT MV, SV, WV. Bleed wellhead pressures down to zero. 6. 0 Bleed production flow and GL lines down to zero and blind flange. 7. 0 Remove wellhouse, level pad. NA' Rig Work: (scheduled to begin October 10 2012) 1. MIRU and test BOPE to 250 psi low and 3,500 psi high. 2. Mill 3.80" single string window in 4 -1/2" 12.6# 13Cr -80 production liner from mechanical monobore packer whipstock at 10,240' and and 10' of rathole. 3. Drill build /lateral: 4.25" OH, 1985' (13° /100 planned) with resistivity. 4. Run 3 -1/2" x 3 -1/4" L -80 liner leaving TOL at 10,210' md. 5. Pump primary cement leaving TOC at 10,210' md, 18 bbls of 15.8 ppg liner cmt planned. 6. Perform liner cleanout with mill, motor and MCNL /GR /CCL log. 7. Test liner lap to 2,400 psi. 8. Perforate -' 100'. 9. Freeze protect well to 2200' TVD. 10. Set BPV. ND BOPE stack. Freeze protect tree and PT tree cap to 3500 psi. 11. RDMO Nordic Rig. Post -Rig Work: 1. Re- install wellhouse, flowline and pull BPV. 2. Set 4 -1/2" KB liner top packer. 3. Generic GLV's. Matthew Ross CTD Engineer 564 -5782 CC: Well File Sondra Stewman/ Joe Lastufka ' TREE = FMC • NOTES: WELL ANGLE > 70 @ 10722' WELLHEAD = FMC B-27tk * ** 4-1/2 CHRO TBG &LNR* ACTUATOR = AXELSON KB. ELEV = 81.92' BF. ELEV = . 44.32' I KOP = 3000' ' ' 2221' I-1 4-1/2" HES X NIP, ID = 3.813" Max Angle = 84° @ 11190' Datum MD = 10569' GAS LIFT MANDRELS Datum TVD= 8800' SS ST MD TVD DEV TYPE VLV LATCH PORT DATE 120" CONDUCTOR, ID = ? H 110' 4 3313 3304 15 MMG DOME RK 16 08/06/08 3 6184 5598 45 MMG SO RK 20 08/06/08 13 -3/8" CSG, 72 #, L -80, ID = 12.347" I-1 2678' M 2 8103 6989 42 MMG DMY RK 0 07/31/08 1 9317 7903 43 MMG DMY RK 0 07/31/08 1 9385' H4 -1/2" HES X NIP, ID = 3.813" Minimum ID = 3.725" @ 9614' 4-1/2" HES XN NIPPLE ..-1 9405' H9 -518" X 4 -1/2" BKR S-3 PKR, ID= 3.875" 1 1 1 9430' 1-14-1/2" HES X NIP, ID = 3.813" I 4 -1/2" TBG, 12.6#, 13CR -80 NSCT, --I 9492' I / ‘ -1 9492' H4 -1/2" WLEG, ID = 3.958" I .0152 bpf, ID = 3.958" 1 9566' 1- I9 -5/8" X 5 -1/2" BKR S -3 PKR, ID = 4.75" I I 9572' H5-1/2" X 4-1/2" XO, ID = 3.875" I 1 1 9593' H4-1/2" HES X NIP, ID = 3.813" I 1 1 I 9614' H4 -1/2" HES XN NIP, ID = 3.725" I 4-1/2" TBG, 12.6 #, L -80 BTRS -M, -I 9625' , I 9621' I- 19 -5/8" X 8" BKR ZXP PKR, ID = 7.50" I .0152 bpf, ID = 3.958" 9626' H4 -1/2" WLEG, ID = 4.0" I 9635' H 9 -5/8" X 7" BKR HMC LNR HGR, ID = 6.188" I 9642' I-I 7" X 5-1/2" XO, ID = 4.813" I 19-5/8" X 7" BOT LNR HGR, ID = ? H 9781' 9644' H5-1/2- /2" X 4-1/2" XO, ID = 3.958" I 17" LNR, 26 #, L -80 BTRS, .0383 bpf, ID = 6.276" H 9791' I- 9 -5/8" CSG, 47 #, L -80, ID = 8.681" H 10082' .. • 7" LNR, 29 #, L -80 BTRS, .0371 bpf, ID = 6.184" I—I 11165' 7" MILLOUT WINDOW (B -27A) 10115' - 10160' PERFORATION SUMMARY REF LOG: ATLAS /GR 06/11/96 ` ANGLE AT TOP PERF: 72° @ 10789' Note: Refer to Production DB for historical perf data 11001' — FISH 1-3/8" FISHING NECK WRD SIZE SPF INTERVAL Opn /Sqz DATE 2 -7/8" 6 10789 -10804 0 11/01/97 W.V.O••• DISCONNECT- 46'LEFTDH (12/11/11) 44.1414.41� ' 2 -3/4" 6 10950 -10970 0 04/18/97 •;;;.w;;;;;;, 1414••••••••• . .1.4.1•...4. 2 -3/4" 6 11034 - 11064 0 06/24/96 •;;;;, �;;;;;;, 1 . 1 1..... 4. 1 . 2 -7/8" 4 11038 -11056 0 04/17/00 . ' � P4; �. 4 . 4' , PBTD 11371' 1 ...14.1...14. 2 -3/4" 4 11130 - 11160 0 06/24/96 .....V4:4•4•4:4; ',---,:s-- 2 -1/2" 6 11175 -11235 0 06/24/96 11 ' •4. ': •1 ' 1 :.. 1 ::: 4. : 4 : ::::: 2 -7/8" 4 11195 - 11225 0 04/17/00 2 -1/2" 4 11270 - 11300 0 07/19/96 2 -1/2" 4 11330 - 11360 0 07/19/96 4-1/2" LNR, 12.6#, 13CR -80 NSCT, -I 11415' .0152 bpf, ID = 3.958" DATE REV BY COMMENTS DATE REV BY COMMENTS PRUDHOE BAY UNIT 12/16/85 AUDI #2 ORIGINAL COMPLETION 09/25/08 MD /JMD DRLG DRFT CORRECTIONS WELL: B -27A 06/16/96 N18E RIG SIDETRACK (B -27A) 1 10/21/08 PJC DRLG DRFT CORRECTIONS PERMIT No: n961010 08/01/08 N4ES RWO 12/14/11 PBS/ PJC FISH (12/11/11) API No: 50- 029 - 21471 -01 07/16/08 DTR/SV PULL FISH / PLUG (07/09/08) l SEC 31, T11N, R14E, 496' FNL & 1595' FEL 07/22/08 DTR/SV SET PLUG /C-SUB (07/21/08) 07/22/08 RRDISV JET CUT TBG (07/22/08) BP Exploration (Alaska) — minor • • TREE= FMC • V,V�LHEAD B FMC plit-11( 2 7 B NOTES: WELL ANGLE > 70° ( 10722' * 4 -112" CHROME TBG & LNR * ** ACTUATOR= AX —iii-19-27 proposed C TD sideir-3ck - 143 — .13 - 16/= -- B. E LEV = _ BF. BLEU = 4432' I KOP= 3000' 2221' I-14- 112" HES X NIP, D = 3.813" At�x Angle = 4 @11190' I 11 Datum MD= 10569' GAS LFT MANDRELS Datum TVD = 8800' SS ST MD TVD DEV TYPE VLV LATCH PORT DATE 4 3313 3304 15 MMG DOME RK 16 08/06/08 20" CONDUCTOR, D = ? —I 110' > 3 6184 5598 45 MMG SO RK 20 08/06/08 2 8103 6989 42 MMG DMY RK 0 07/31/08 13 -3/8" CSG, 72#, L -80, D = 12.347" I—{ 2678' 1 9317 7903 43 MMG DMY RK 0 07/31 /08 Minimum ID = 3.725" @ 9614' I I 9385' — 14 -1/2" HES X NP, U= 3.813" 4 -1/2" HES XN NIPPLE >< >K 9405' - -I9 - 5/8" X 4 -1/2" BKR S-3 PKR, D = 3.875" / \ ' , 9430' -- 4 -1/2" HES X NP, D = 3 -813" I 4 -1/2" TBG, 12.6#, 13CR -80 NSCT, H 9492' / \ L 9492' I - 14 - 1/2" WLEG, D= 3.958" -0152 bpf, ID = 3.958" — [ 9572' - 15-1/2" X 4-1/2" XO, ID S-3 PSR D= 4.75" ' I '593' —) 4-1/2" HES X NP, D = 3.813" I ' I 9614' 14 -112' HES X NP, ID = 3.80' - Mdl out pre rig 4 -1/2" TBG, 12.6#, L -80 BTRS -M, — 9625' 9621' — 19 - 5/8" X 8" BKR ZXP PKR D = 7.50" .0152 bpf, D = 3 -958" 9626' H4 - 1/2" WLEG, D = 4.0" \ W \ 9635' — j 9 X 7" BKR HMC LNR HGR, D = 6 -188" 9642' H7" X 5 -1/2" XO, ID = 4.813" I9 -5/8" X 7" BOT LNR HGR, D = ? —I 9781' ( , %' /% 11 9644' 5-1/2" X4-1/2" XO, D = 3.958" 7" LNR, 26#, L -80 BTRS, .0383 bpf, ID = 6.276' H 9791' X I 9 -5/8" CSG, 47 #, L -80, D= 8.681" H 10082' KAI Top of3 1/2 "lnerand cem ent@ 10,210' 7" LNR, 29 #, L -80 BTRS, -0371 bpf, D = 6.184" — 11165' I. 7" MLLOUT WNDOW (B -27A) 10115' - 10160' PERFORATION SU/T ARY 3 - 12 "x 3 1/4 "X0 - 10,220'M D REF LOG: ATLAS/GR 06/11/96 N 1 TD @ 12,225' ANGLE AT TOP PERF: 72' @ 10789' I 15) Note: Refer to Production DB for historical perf data SIZE SPF INTERVAL Opn/Sgz DATE / 11001' — FISH - 1 -3/8" FISHING PECK WRD 2 -7/8" 6 10789 - 10804 C 11/01/97 Ilkihi\, ` d/ ` DISCOWECT- 46' LEFT DH (12/11/11) 2-3/4" 6 10950 - 10970 C 04/18/97 ..•■......•■. ` ............ ............i 2 -314" 6 11034 - 11064 C 06/24/96 ' i i • i J' ?i i • 2 -7/8" 4 11038 - 11056 C 04/17/00 'iii: ........... : i.Y� i .' s'.'. 0� .. 2 -3/4" 4 11130 -- 11160 C 06/24/96 ...t.,•. ' ? ? ?:'Si'i'ii' PBTD H 11371' iiii ............. ..i 2-1/2" 6 11175 - 11235 C 06/24/96 � � � � . i� •� .iii� � �.i 2 -7/8" 4 11195 - 11225 C 04/17/00 : i l �Lt :..' .' : 2 -1/2" 4 11270 - 11300 C 07/19/96 4 2 -1/2" 4 11330 - 11360 C 07/19/96 12 "packerwh�s nck @ 10,240'M D 4 -1/2" LNR, 12.6#, 13CR -80 NSCT, —I 11415' .0152 bpf, ID = 3 -958" DATE REV BY COMMENTS DATE REV BY COMMENTS PRUDI BAY MIT 12/16/85 AUDI #2 ORIGINAL COMPLETION 09/25/08 MD/JND DRLG DRFT CORRECTIONS WELL B-27A 06116/96 N18E RIG SIDETRACK (B-27A) 10/21/08 PJC DRLGDRFTCORRECTIONS PERMT No: '1961010 08/01/08 N4ES RWO 12/14/11 PBS/ PJC FISH (12/11/11) API No: 50 -029- 21471 -01 07/16/08 DTR/SV PULL FISH / PLUG (07/09/08) SEC 31, T11 N, R14E, 496' Ft'L & 1595' FE_ 07/22/08 DTR/SV SET PLUG/C -SUB (07/21/08) 07/22/08 RRDISV JET CUT TBG (07 /22/08) BP Exploration (Alaska) NORDIC - CALISTA RIG 1 CHOKE / REEL /CIRCULATION MANIFOLD DIAGRAM V12 III. 411 0 a V14 7- 1118" 6000 psi BOP's ID = 7.06" Min V15 Vii ' . ' - - 171/16 "5000 psi, RXJ6 Transducers 0 L 1 7 POOR BO DEGASSER V2 l V1 V 16 �.�... Note typical BOP arrangement for 23a)" � coiled tubing tti �` \`� \'. � t I ]t /16 "5000 pa. RX�6 ir, ' V17 ' PC 1 r B oy Gas Bus HCR ' IC �' IK OK I V18 V79 J ' � 11/16 "5000 p s i Rx-24 1- 1 II ■ I 3.00" 6000 pai HCR 1.0 I """ H4 "6000pal CHECK VALVE Manual Choke - �� .11.1: � 71/18 Cameron FOV Gate I 8 8 li Valve s 5000 pal MEOH /Diesel , , , , , 1— FP Line CoFlex Hose . =. 0 Moti -^ r - r r r 1/4 Turn Halco ■ SWACO 10WOG To Production Tree or Cross Over SHAKER '- T re.. a transducers 0/11 ' 1 // 0/12 To Coiled Tubing Bleed OR (V Inner Reel Valve '" _ _ AIL _ { f - 0/13 Cement Line In Ground Level Tie -in CoFlex Hose CV10 1►� CV3 CV2 T Stand Pipe _..t.,__ - - A& _ - Ilk = — Manual Choke -- - - - - - - Pressure Transducers 11111.1= a I _ I I 0/9 ... / / I CV17 0 . ■ 0/8 I 0 CV1 IIIIIIIIIM III tir — a , Tiger Tank Mud Pump 2 • a V O _ In From MIN 0. r. Baker MP 1 8,51P2 Choke • • CV14 to Pill I Rig Floor It Mud Pump 81 co CV16 Reverse Ci :.. • @ , Cir CT while OOH M To Manifold CV1S 1-Jun-2010 4-0 Pon..no r:..- ,.lar:,.,, lino / CT while (ION CoFlex Hose V• • Page 1 of 1 • Schwartz, Guy L (DOA) From: Schwartz, Guy L (DOA) Sent: Friday, September 21, 2012 2:26 PM To: ' Lastufka, Joseph N (Northern Solutions)'; Sayers, Zach J Subject: RE: B -27A Sundry number 312 -342 (PTD 196 -101) Joe, You have verbal approval to P & A B -27A (PTD 196 -101) as proposed in the sundry application. Sundry number will be 312 -342. Guy Schwartz Senior Petroleum Engineer AOGCC 793 -1226 (office) 444 -3433 (cell) From: Lastufka, Joseph N (Northern Solutions) [mailto:Joseph.Lastufka @bp.com] Sent: Friday, September 21, 2012 1:45 PM To: Schwartz, Guy L (DOA); Sayers, Zach J Subject: B -27A Sundry number 312 -342 Guy, Due to road issues, we are scheduling the P &A of B -27A to begin this weekend. Please provide us with a verbal approval at your earliest convenience. Feel free to contact me at the numbers below or Zach (564 -5790 office, 575 -5189) if you have any questions or require additional information. Thank you., Joe Lastufka Alaska Wells Technologist Cell: (907) 227 -84961 Office: (907) 564 - 4091 }X Description: Description: custom %20header BP Exploration Alaskal900 E. Benson Blvd.1Room: 788D 'Anchorage, AK 9/21/2012 Page 1 of 1 Subject: FW: INTENT PLUG for RE -DRILL WELLS: Corrected From: Davies, Stephen F (DOA) Sent: Monday, February 08, 2010 10:52 AM To: Foerster, Catherine P (DOA); McMains, Stephen E (DOA); Schwartz, Guy L (DOA); Saltmarsh, Arthur C (DOA); Aubert, Winton G (DOA) Subject: RE: INTENT PLUG for RE -DRILL WELLS: Corrected Revised procedure with an additional step per Cathy's comment: INTENT PLUG for RE -DRILL WELLS (IPBRD) Type Work Code in RBDMS 1. When a Form 10 -403 is submitted requesting approval to plug a well for redrill, the initial reviewer (Art or Steve D.) will check to make sure that the "Plug for Redrill" box in the upper left corner of the 403 form is checked. If the "Abandon" box is checked, we will cross that erroneous entry out and initial it on both copies of the Form 10 -403 (AOGCC's and operator's copies). 2. On the Form 10 -403 if "Abandon" is checked in Box 15 (Well Status after proposed work), Art or Steve D. will cross that erroneous entry out and initial it on both copies of the Form 10 -403 (AOGCC's and operator's copies). Instead, we will check the "Suspended" box. Guy and Winton will serve as quality control for steps 1 and 2. 3. When Steve McMains receives the Form 10 -403 with a check in the "Plug for Redrill" box, he will enter the existing code "IBPRD" into RBDMS. This code automatically generates a comment under the History tab stating "Intent: Plug for Redrill." 4. When Steve McMains receives any Form 10 -407, he will check the History tab in RBDMS for this comment. If he sees the "Intent: Plug for Redrill" code, and cannot find any evidence that a subsequent re -drill has been COMPLETED, he will assign a status of SUSPENDED to the well bore in RBDMS, no matter what status is listed on the 10 -407. Steve will also change the status on the 10 -407 form to SUSPENDED, and will date and initial his change. If Steve does not see the "Intent: Plug for Redrill" comment or code, he will enter the status listed on the Form 10 -407 into RBDMS. 5. When the Form 10 -407 for the redrill is received, Steve M. will change the original well's status from suspended to abandoned. 6. The first week of every January and July, Steve M. and Steve D. will check the "Well by Type Work Outstanding" user query in RBDMS to ensure that all of the Plug for Redrill wells have been handled properly. At this same time, Steve M. and Steve D. will also review the list of suspended wells for accuracy. Thanks, Steve D. file: //F: \Daily_ Document_ Record \Procedures_Instructions \FW INTENT PLUG for RE- DRI... 4/6/2012 23 -SEP -2011 {� ` p�r 2 lt %0 SLAhnlir r ���� 1 !�9 0 a�� No. 5796 Alaska Data & Consulting Services Company: State of Alaska Alaska Oil & Gas Cons Comm Anchorage, orage, AK 95 Gambill' Street, 995 03 Suite 400 Attn: Christine Shartzer A 333 West 7th Ave, Suite 100 ATTN: N: Stephanie tephanie Pacillo Anchorage, AK 99501 Well Job # Log Description Date BL Color CD Z -04A BR12 -00017 PPROF W /DEFT & GHOST 13- Sep -11 1 1 W -05A BCRC -00126 PPROF W/ DEFT 14-Sep-11 1 1 G -30C BUTT -00025 LEAK DETECTION LOG 8- Sep -11 1 1 MPE -23 BCRC -00122 IPROF 11- Sep -11 1 1 MPB -05A BCRC -00120 IPROF 9- Sep -11 1 1 • Z -04A BR12 -00017 CEMENT BOND LOG 15- Sep -11 1 1 R -03A BBSK -00094 PRIMARY DEPTH CONTROL LOG 15- Sep -11 1 1 B-27A BCRC -00134 PPROF W /GHOST 17- Sep -11 1 0 PLEASE ACKNOWLEDGE RECEIPT BY SIGNING AND RETURNING ONE COPY EACH TO: BP Exploration (Alaska) Inc. Alaska Data & Consulting Services Petrotechnical Data Center LR2 -1 2525 Gambeli Street, Suite 400 900 E. Benson Blvd. Anchorage, AK 99503 -2838 BP Exploration (Alaska) Inc. Attn: Well Integrity Coordinator, PRB-20 Post Office Box 196612 Anchorage, Alaska 99519-6612 Dec 11, 2009 by ~~: Mr. Tom Maunder Alaska Oil and Gas Conservation Commission 333 West 7th Avenue Anchorage, Alaska 99501 Subject: Corrosion Inhibitor Treatments of GPB Pad B Dear Mr. Maunder, E.~ ~ 1009 >.... _ . fab~l°~ ~3-a~A Enclosed please find multiple copies of a spreadsheet with a list of wells from GPB Pad B that were treated with corrosion inhibitor in the surface casing by conductor annulus. The corrosion inhibitor is engineered to prevent water from entering the annular space and causing external corrosion that could result in a surface casing leak to atmosphere. The attached spreadsheet represents the well name, API and PTD numbers, top of cement depth prior to filling and volumes of corrosion inhibitor used in each conductor. As per previous agreement with the AOGCC, this letter and spreadsheet serve as notification that the treatments took place and meet the requirements of form 10-404, Report of Sundry Operations. If you require any additional information, please contact me or my alternate, Anna Dube, at 659-5102. Sincerely, Torin Roschinger BPXA, Well Integrity Coordinator BP Exploration (Alaska) Inc. Surface Casing by Conductor Annulus Cement, Corrosion inhibitor, Sealant Top-off Report of Sundry Operations (10-404) Date: 12/11/09 l Well Name PTD # API # Initial to of cement Vol. of cement um ed Final top of cement Cement top off date Corrosion inhibitor Corrosion inhibitor/ sealant date ft bbls ft na al B-01 1700080 50029200590000 Sealed Conductor NA NA NA NA NA B-02 1961110 50029200660100 Sealed Conductor NA NA NA NA NA B-03A 1870480 50029203060100 NA 0.5 NA 3.40 8/20/2009 B-04 1700320 50029200720000 Sealed Conductor NA NA NA NA NA B-O56 2010680 50029202760200 NA 1.8 NA 13.60 8/22/2009 B-O6 1770740 50029202790000 NA 1 NA 5.10 8/20/2009 B-07 1780020 50029202850000 NA 1 NA 5.10 8/20/2009 B-08 1780410 50029203140000 NA 1 NA 6.80 8/20/2009 8-09 1780490 50029203160000 NA 0.5 NA 3.40 8/20/2009 B-10A 2082050 50029203210100 Cellar liner welded to casin NA NA NA NA NA B-11 1780690 50029203310000 NA 0.5 NA 3.40 8/20/2009 B-12 1970090 50029203320100 NA 0.6 NA 3.40 8/22/2009 B-13 1990570 50029203410100 NA 0.4 NA 1.70 8/20/2009 8-14 2090590 50029203490000 NA 0.4 NA 1.70 8/20/2009 B-15 1790190 50029203600000 NA 0.1 NA 1.70 8/20/2009 B-16 1790250 50029203650000 NA 0.8 NA 5.10 8/21/2009 B-17 1790280 50029203680000 NA 0.1 NA 1.70 8/20/2009 B-18 1820020 50029207020000 NA 1.5 NA 15.30 8/21/2009 B-19 2001610 50029207030100 NA 0.1 NA 1.70 8/21/2009 B-20 1821680 50029208420000 NA 0.5 NA 3.40 8/21/2009 B-21 1821760 50029208500000 25 4.5 BBLS 0.1 11/30/2009 1.70 12/3/2009 B-22A 2001570 50029207590100 34 6.5 BBLs 0.2 11/30/2009 1.70 12/3/2009 B-23 1970590 50029207790100 12 2.2 BBLs 3.2 11/30/2009 10.20 12/4/2009 B-24 1821400 50029208150000 NA 3 NA 22.10 8/21/2009 B-25 1821510 50029208260000 NA 0.25 NA 1.70 8/13/2009 B-26 2000570 50029209760200 NA 0.3 NA 1.70 8/21/2009 B-27 1961010 50029214710100 Sealed Conductor NA NA NA NA NA B-28 1853030 50029215100000 NA 1.1 NA 6.80 8/22/2009 B-29 2002090 50029215230100 NA 0.7 NA 6.80 8/21/2009 B-30 2011050 50029215420100 NA 0.2 NA 1.70 8/21/2009 B-31 1910460 50029221520000 NA 0.3 NA 1.70 8/20/2009 B-32 1991180 50029221650100 NA 0.3 NA 1.70 8/20/2009 B-33 1931450 50029223390100 NA 1.2 NA 8.50 8/21/2009 B-34 1930370 50029223520000 NA 1.2 NA 10.20 8/21/2009 B-35 1931460 50029224060000 NA 0.3 NA 1.70 8/20/2009 B-36 1960650 50029226670000 NA 0.3 NA 1.70 8/21/2009 B-37 2071450 50029233750000 Sealed Conductor NA NA NA NA NA ~~~~~I~~~ Alaska Data & Consulting Services 2525 Gambell Street, Suite 400 Anchorage, AK 99503-2838 .• ~ rY (~~+~ ` ,",~4., y .1 ._.J~.'_~ ATTN: Beth ~ °_. ~, ~. .r.,...,, _ . _. Well Job # Log Description Date osi2~ios NO. 5336 Company: State of Alaska Alaska Oil & Gas Cons Comm Attn: Christine Mahnken 333 West 7th Ave, Suite 100 Anchorage, AK 99501 BL Color CD 14-12 AYTU-00048 USIT L- 07/26/09 1 1 ~2-06 ANHY-00101 PRODUCTION PROFILE ~~~ 07/23/09 1 1 03-20A AYKP-00034 CROSSFLOW CHECK C' 07/16/09 1 1 M-06A AZCM-00034 PRODUCTION LOG '' - 07/13/09 1 1 P1-11 AYS4-00086 PRODUCTION PROFILE (p L ' 07/21/09 1 1 02-11A AYS4-00084 LDL ) 07/20/09 1 1 W-212 63SQ-00011 INJ PROFILE W/WFL ~ - 07/20/09 1 1 W-215 AYKP-00036 INJ PROFILE W/RST-WFL ~ - 07/25/09 1 1 W-207 AYKP-00035 INJ PROFILE W/RST-WFL ' -~ L 07/24/09 1 1 H-29A AYQQ-00027 RST 05/19/09 1 03-28 B14B-00067 RST j- C.{ 07/17/09 1 1 B-27A AXBD-00029 MCNL 06/12/09 1 1 C-15A AWJI-00038 MCNL - 06/25/09 1 1 Q-04A B1JJ-00023 MCNL ~ ' 05/28/09 1 1 V-05 OSAKA0024 OH MWD/LWD T 10/13/08 1 1 07-06B AWJI-00042 MCNL 07/21/09 1 1 02-33B 09AKA0149 OH MWD/LWD EDIT ~. O6/03/09 1 1 14-23A 09AKA0035 OH MWD/LWD EDIT ~ 05/12/09 1 1 H-19B B2WY-00004 MCNL (REPLACEMEN~ - L 05/O7/09 1 PLtASt AGKNUWLtU(it FitGtIH I 13Y SIGNING ANU Fit 1 UIiNIN(d UNt LUYY tAGFI 1 U: BP Exploration (Alaska) Inc. Petrotechnical Data Center LR2-1 900 E. Benson Blvd. Alaska Data & Consulting Services 2525 Gambell Street, Suite 400 Anchorage, AK 99503-2838 • ~ ~~ ~ ~~~ ~ ~~~1~~~~~~~~ _'~.'~,~'r~~»#.dW. -?~.;;,, Ka iUl;v; N0.5310 lAlasRa Data F~ Consuiting Services Company: State of Alaska 2525 Gambell Street, Suite aoo Alaska Oil & Gas Cons Comm f~nchorage, AFL 99503-2838 Attn: Christine Mahnken l~TYRf. Be4h 333 VUest 7th Ave, Suite 100 Anchorage, AK 99501 Wes' Job # Log Description Date BL Color CO 07/14/09 Z-20 AP3Q-00043 SBHP SURVEY - 06/17/09 1 1 P2-31 AZCM-00029 LDL G, ~ ' O6/17/09 1 1 12-03 AV1M-00022 SBiiP SURVEY 06/15/09 1 1 Z-14~ AYQQ-00036 TEMP SURVEY & BHP . 06/23l09 1 1 RI-16 AP3Q-00042 SBHP SURVEY 6 ~ 06/i6/09 1 1 V~QS- : 11999053 USIT 10/12/08 1 1 „ M-i1C AP3Q-00042 SBHPSURVEY O6/16/09 1 1 '`""~~-~~ AY3J-00030 LDL _ 06/12/09 1 1 L1-30 AVYS-00049 PRODUCTION PROFILE -(~j ~ ~ O6/22/09 1 1 97-076 AYQQ-00031 SBHP SURVEY "~ J C5 06/11/09 1 1 OS-256 AP3Q-00040 SBHP SURVEY ~ 06/11/09 1 1 B-27A AXBD-00028 MEAA INJ PROFILE 06l12/09 1 1 ti36 614B-00066 CROSSFLOW & IBP ~ 06/23/09 1 1 ~-21dA B14B-00065 SBHP SURVEY ' 06/21/09 1 1 X-17 AYTU-00043 PROD PROFILE .- ~ 06/08/09 1 1 ~°25 AWLS-00018 LDL (J~~ ~°~j - 05/28/09 1 1 02-33B AYTU-00033 USIT '°~ ~ OS/19/09 1 1 P2-07 AVYS-00051 PRODUCTION PROFILE ~~ ~ 06/25/09 1 1 93-03 AWLB-00020 LDL _ 06/01/09 1 1 3-17F/K3p 621VJ-00008 MEM INJ PROFILE 06/15/09 1 1 MPS-08 AYS4-00080 LDL 06/15/09 1 1 13-9T_ AViH-00019 LDL - 07/05/09 1 1 09-25 AYTU-00046 USIT - ~~ 06/28/09 1 1 W-39A AWLS-00023 STATIC TEMP SURVEY a'" , ` 06/26/09 1 1 Z35 AYTO-00022 SBHP SURVEY ~ 06/29/09 1 1 ~-96 AV1H-00017 SBHPSURVEY f () ' 06/29/09 1 1 18°20 6581-00004 LDL - ~ 06/27/09 1 1 Z-29 AVY5-00053 SBHP SURVEY ~~ a~ ,18;~:` '` ~ ~ ' ~ 07/03/09 1 1 L5-09 AYQQ-00032 ~ RST ~ ~ L ~ 06/13/09 1 1 07-10A ~i FecG er~rnin~nn cnr_~ ~G BiJJ-00022 l~GIOT ~V @If~~~l MCNL •~- b~ ~ ~~f~ . 05/26/09 1 ---- - -. _._._..__...._.._..,.............~....~ ~ ~.,..~. ~... BP Exploration (Alaska) Inc. Petrotechnical Data Center LR2-1 900 E. Benson Blvd. Alaska Data & Consulting Services 2525 Gambeil Streei, Suite 400 Anchorage, AK 99503-2838 • ~ u ~ ~ ~ ~ ~ Schru~ber~er N0. 5297 ,~laska Data & Consultin Services 1~:~ ,~,y << F ~` ~ 2525 Gambell Street, Suite 400 ~u•J~~S9~.~d ~~.1' -~ ~~~"; Company: State of Alaska Alaska Oil & Gas Cons Comm Anchorage, AK 99503-2838 Attn: Christine Mahnk~n ATTN: Be4h 333 West 7th Ave, Suite 100 Anchorage, AK 99501 Mlell Job # Log Description Date BL Color CD o~iosios ~-06 AYTO-00035 GLSJPRODUCTION PROFILE 05/12/09 1 1 07-33B 64C4-00003 SCMT 05/30/09 1 1 17-14 AVY5-00049 PRODUC ION PRO ILE ~/- 05/31/09 1 1 12-01 AYTU-00039 PRODUCTION PROFILE 06/01/09 1 1 04-43 AXWS-00011 IBP/CROSS FLOW CHECK - '~. 06/02/09 1 1 D-13A B04C-00059 USIT - 06/03/09 1 1 ~-99a B2WY-00011 MEM PROD PROFILE '~ - 06/03/09 1 1 06-05 B04C-00061 USIT 06/OM09 1 1 12-1~ AViH-00014 PRODUCTION PROFILE 06/04l09 1 1 A-35 AY3J-00026 USIT a(p ~ 06/OM09 1 1 1~-22 AXWS-00013 PROD PROF/GLS O6/05/09 1 1 12-96A AXWS-00014 PRODUCTION PROFILE -~ O6/OS/09 1 1 18-29~ B04C-00062 PSP XY-CALIPER LOG ~ 06/06/09 1 1 C-12A AXWS-00015 SCMT ...- ~ O6l06/09 1 1 B-27A AXBD-00028 MEM PROD PROFILE O6/11/09 1 1 L2-13A AWJI-00036 MEM CNL & INJ PROFILE ~ O6/17/09 1 1 ~2-13A AWJI-00036 MEM PROD PROFILE / 06/17/09 1 1 07-21 B148-00064 LDL O6/20/09 1 1 17-O1A AY~Q-00030 SBHP SURVEY - O6/11/09 1 1 01-25 AP3~-00041 LDL - 06/15/09 1 1 L•202 B2WY-00010 MEM PROD PROFILE ~- C,/ 06/02/09 1 1 L-103 AXBD-00027 MEM INJ PROFILE O6/04/09 1 1 GNI-03 AWJI-00034 MEM PRESS & TEMP SURVEY ~'~-.- 06/15/09 1 1 G-31 B AWJI-00027 MCNL -03 04/30/09 1 1 15-296P61 O9AKA0143 OH MWD/lWD EDIT ~ ~ ~~ OS/11/09 2 1 . r~.~vr r.v.~.av.ovrvva. ~~~v~~r ~ ~ ~ ~a~aa~~~~~V ~yIYY f1C1 Vf11Y11Y1.f VIYG liVrT CNVI'1 I ll: BP Exploration (Alaska) Inc. Petrotechnical Data Center LR2-1 900 E. Benson Blvd. Alaska Data & Consulting Services 2525 Gambell Street, Suite 400 Anchorage, AK 99503-2838 f ~ ~ ~ ~ ~ ~,/ _ ° _ 01 /23/09 5eblumberger Alaska Data & Consulting Services a(`~ 2525 Gambell Street, Suite 400 Anchorage, AK 99503-2838 0~ , ATTN: Beth _pAJ "L.. a~~~k ~Q W/ alt \ O _Inh 1k 1 .... n~ ..•:.. N0.5047 Company: State of Alaska Alaska Oil & Gas Cons Comm Attn: Christine Mahnken 333 West 7th Ave, Suite 100 Anchorage, AK 99501 H-35 11970840 - - - ----- ----- PRODUCTION PROFILE ---- 08/12/08 -- 1 ........ ...r 1 -11 12111927 IBP & CROSS-FLOW STP ~ 1 11/24/08 1 1 MPS-41 11966291 SCMT - J~o 11/24/08 1 1 K-05C AWJB-00016 MEM PROD PROFILE U _ ~-5 12/29/08 1 1 14-17A AXOY-00010 MEM INJECTION PROFILE r Q -Q(} ~ 01/15/09 1 1 F-33 ALYF-00010 CEMENT IMAGE LOG (p- ~"`- 12/30/08 1 1 K-16AL2 AXIA-00009 MEM PROD PROFILE 0 ~ 01/10/09 1 1 01-29 AP3O-00011 USIT ~ j 01/04/09 1 1 09-30 AY1M-00007 STATIC SPINNER &IBP ~:-~~ L,~ 01/15/09 1 1 N-18A AZCM-00005 JEWELRY LOG/PRESSITEMP - ~ 01/06/09 1 1 R-24 AY3J-00004 USIT 01/16/09 1 1 N-18A AWLB-00002 USIT 12/26/08 1 1 V-212 AXBD-00010 MEM INJECTION PROFILE ~ 01/16/09 1 1 V-222 ALYF-00011 INJ PROFILElWFL .~ j~'~ 01/08/09 1 1 07-Oa'~A AYOO-00009 USIT ~f - L 01/22/09 1 1 N-12 12014053 RST - 09/30/08 1 1 E-32B AXOY-00005 MCNL 11/18/08 1 1 P2-15A 11594511 SCMT (PDC) (REVISION 2) i 33.4-`~ 06/15/07 1 B-27A 11999059 _ RST ®D~ ~ ~~ 11/07/08 1 1 12-37 40018138 OHM D/LWD EDIT _~ ~~-- 11/07/08 2 1 N-18A 08AKA0037 OH MWD/LWD EDIT d~S ~- -~ 12/24/08 2 1 H-38 08AKA0031 OH MWD/LWD EDIT C 12/07/08 2 1 _ L So __. ...~ ., ........ ...........~ ..w.... . ... v..w,.n.v r~~w nr. ~ vn~~nw vw~ a.vr i ch~.n ~ v: BP Exploration (Alaska) Inc. Petrotechnical Data Center LR2-1 900 E. Benson Blvd. ^ I Anchorage, Alaska 99508 + ~ I n Date Delivered Alaska Data & Consulting Services 2525 Gambell Street, Swte 400 Anchorage, AK 9~ :Q~ 0 8 `' ~t - ~ ` ATTN: Beth .-~ Received by: ~,- eG,...,.6,.,., d~"21 4Y p'°n.. ~T. 0 4Y~1. t, kAV~MMS~ • • STATE OF ALASKA "' ~ ~~~ 9 ~D~ A OIL AND GAS CONSERVATION COM ~ ~O LQ~ REPORT OF SUNDRY WELL OPERA 10~~ Alaska Gil ~ Gas Cons. Cci~rriission 1. Operations Performed: An~1~0, a~6 ^ Abandon ®Repair Well - ^ Plug Perforations ^ Stimulate ^ Re-Enter Suspended Well ^ Alter Casing ®Pull Tubing - ^ Perforate New Pool ^ Waiver ^ Other ^ Change Approved Program ^ Operation Shutdown ^ Perforate ^ Time Extension 2. Operator Name: 4. Well Class Before Work: 5. Permit To Drill Number: BP Exploration (Alaska) Inc. ®Development - ^ Exploratory 196-101 3. Address: ^ Service ^ Stratigraphic 6. API Number: P.O. Box 196612, Anchorage, Alaska 99519-6612 50-029-21471-01-00 ' 7. KB Elevation (ft): 75.40 ~ 9. Well Name and Number: PBU 6-27A ' 8. Property Designation: 10. Field /Pool(s): , ADL 028310 - Prudhoe Bay Field / Prudhoe Bay Pool 11. Present well condition summary Total depth: measured 11415- feet true vertical 9073 feet Plugs (measured) None Effective depth: measured 11370 feet Junk (measured) None true vertical 9066 feet Casing Length Size MD TVD Burst. Collapse Structural Conductor 110' 20" x 30" 110' 110' Surface 2678' 13-3/8" 2678' 2678' 4930 2670 Intermediate Production 10082' 9-5/8" 10082' 8465' 6870 4760 Liner 334' 7" 9781' - 10115' 8243' - 8489' 7240 5410 Liner 1780' 4-1/2" 8136' - 9 073' 9635' - 11415' 8430 7500 y~f 1 ~ Perforation Depth MD (ft): 10789' - 11360' Perforation Depth TVD (ft): 8969' - 9066' 4-1/2", 12.6# 13Cr-80 9492' Tubing Size (size, grade, and measured depth): 4-~r~° ~2 ~# i -Rn Packers and SSSV (type and measured depth): 9-5/8" x 4-1/2", Baker S-S Packer, 9405' 9-5/8" x 4-1/2", Baker SAB-3 Packer 9566' 12. Stimulation or cement squeeze summary: Intervals treated (measured): Treatment description including volumes used and final pressure: 13. Re resentative Dail Avera a Production or In'ection Data Oil-Bbl Gas-Mcf Water-bbl Casin Pressure Tubin Pressure Prior to well operation: 0 0 0 Subsequent to operation: 764 16510 308 1100 820 14. Attachments: ^ Copies of Logs and Surveys run 15. Well Class after work: ^ Exploratory ®Development ^ Service ® Daily Report of Well Operations 16. Well Status after work: ® Well Schematic Diagram ®Oil _ ^ Gas ^ WAG ^ GINJ ^ WINJ ^ WDSPL 17. I hereby certify that the foregoing is true and correct to the best of my knowledge. Sundry Number or N/A if C.O. Exempt:. Contact Mackie Derrick, 564-5891 NIA Printed Name Sondra Stewman Title Drilling Technologist Sig ture Phone 564-4750 Date Prepared By Name/Number a° ~.~'v~ Sondra Stewman 564-4750 Form 10-404 Revised 04/2006 ; ~ Submit Ori i al Only K ~ ~... ', WELLHEAD = FMC AGTUATOR= B_A KER KB. ELEV = _ 70.02' BF. ELEV = 44.32' KOP = 3000' Max Angle = 84 @ 11190' Datum MD = 10566' Datum TVD = 8800' SS 13-3/8" CSG, 72#, L-80, ID = 12.347" B ~2 7 A & L1QlP'* N W ELL EXCEEDS 70 DEG @ ~ 212 L TBG 2221` I-{4-112" X NiP, iD=3.813 GAS LIFT MANDRELS ST MD ND DEV TYPE VLV LATCH PORT DATE 2678' 4 3313 3304 15 M{ti1G DOME RK 16 08106/{ 3 6184 5598 45 MMG SO RK 20 08106/{ 2 8103 6989 42 MMG DNII' RK 0 07!31!{ 1 9317 7903 43 MMG DMY RK 0 07131({ Minimum ID = 3.725" @ 9614' 4-1 /2" HES XN NIPPLE 4-1/2" TBG, 12.6#, 13CR80 NSCT, .0152 bpf, iD = 3.958" 1/2" TBG, 12.6#, L-80, .0152 bpf, ID = 3.958" I 9625' I ..~'°t 9$85` ~-~4-1,`2" X NIP, ID = 3.813" 9445' 9-518" X 4-1 /2" BKR S-S PKR, ID = 3.875" 9430' 4-112" X NIP, ID = 3.813„ ~H u ~ ,,.....-- 9490` 4-112" WLEG ~ 'd 9566' -j 9-5/8" X 4-1/2" BKR SAB-3 PKR, ID = 3.99" 9593' 4-1/2" HES X NIP, ID = 3.813" 9614' 4-1/2" HES XN NIP, ID = 3.725" 9621' 9-5/8" X 4-1/2" BKR ZXP PKR, ID = 7.50" 9626' 4-1/2" WLEG, ID = 4.0" 9635' ~ 9-5/8" X 4-1/2" BKR HMC HGR, ID = 6.188" TOP OF 7" LNR ~~ 9781' 9-5/8" CSG, 47#, L-80, ID = 8.681" ~~ 10082' 7" LNR, 26#, L-80, .0383 bpf, ID = 6.276" 10115' PERFORATION SUMMARY REF LOG: ATLAS/GR 06/11/96 ANGLE AT TOP PERF: 72 @ 10789' Note: Refer to Production DB for historical perf data SIZE SPF INTERVAL Opn/Sqz DATE 2-7/8" 6 10789 - 10804 O 11 /01 /97 7 " MILLOUT WINDOW 10115' - 10160' (SECTION MILL ) PBTD I--I 11370' 4-1/2" LNR, 12.6#, CR-80, .0152 bpf, ID = 3.958" ~-{ 11415' DATE REV BY COMMENTS DATE REV BY COMMENTS ORIGINAL COMPLETION 08/01/08 NOES RWO 06/16/96 RIG SIDETRACK (B-27A) 08/09/08 /TLH CORRECTIONS &GLV C/O 07/27/01 CWKAK CORRECTIONS 08/26/03 RWL/KK GLV C/O 08/23/06 GJFfTLH PXN PLUG SET 10/01106 RRD/PA PILS COVER FISH @ 9614' PRUDHOE BAY UNIT WELL: B-27A PERMIT No: 1961010 API No: 50-029-21471-01 SEC 31, T11 N, R14E, 496' SNL & 1595' WEL BP Exploration (Alaska) Page 1 of 2 Well: B-27 Wel I History Well Date Summary B-27A 7/3/2008 T/IA/OA=SSV/220/0 PPPOT-T (PASS) PPPOT-IC (PASS) (Pre RWO) PPPOT-T RU 2 HP bleed tools onto THA 100 psi to 0 psi, flush void until clean returns achieved. Pressured to 5000 psi for 30 minute test, 5000/ 15 minutes, 5000/ 30 minutes. Bleed void to 0 psi, RD test equipment, re installed Alemite cap. Cycle and torque LDS "ET style" all moved with no problems. PPPOT-IC RU 2 HP bleed tools onto IC test void 150 psi to 0 psi. Pressured to 3500 psi for 30 minute test, 3500/ 15 minutes, 3450/ 30 minutes. Bleed IC void to 0 psi, RD test equipment re installed Alemite cap. Cycle and torque LDS "ET style" all moved with no problems. B-27A 7/9/2008 ***WELL S/I ON ARRIVAL***(pre ctu mcnl) P LLED P-PRONG FROM PXN-PLUG BODY @ 9614' MD PULLED P N-PLUG BODY FROM XN-NI 9614' MD RE OVERED 1.25 X 3.25 TURBINE COVER LOST ON 9/30/06 ***LEFT WELL S/I, NOTIFY PAD-OP**** B-27A 7/16/2008 ***WELL SHUT IN ON ARRIVAL*** INITIAL T/ I/ O = 2100/ 100/ 100. RIG UP TO JET CUT 4.5" TUBING. PE CANCELLED JOB. HIGH TUBING PRESSURE. WRP NOT SET. RIG DOWN TO LET SLICKLINE SET WRP. WELL LEFT SHUT IN. JOB NOT COMPLETE, DID NOT CUT TUBING. FINAL T/ I/ O = 2100/ 100/ 100. SWAB AND SSV CLOSED, MASTER LEFT OPEN. ***JOB NOT COMPLETE AND POSTPONED UNTIL SL WORK PERFORMED*** B-27A B-27A B-27A B-27A B-27A B-27A B-27A B-27A 7/16/2008 T/I/O = 0+/210/20. Temp = SI. T & IA FL for Eline {pre-jet cut). IA FL C~ surface. SV, WV shut. SSV, MV open. IA, OA otg. AL shut. 7/17/2008 ***WELL S/I ON ARRIVAL*** R/U SLICKLINE UNIT ***CONTINUED ON WSR 07/18/08*** 7/18/2008 ***CONTINUED FROM WSR 07/17/08*** DRIFTED TBG W/ 3.70" CENT, 3.68" SPECIAL CLEARANCE WRP DRIFT TO 9800' SLM (100' PAST TARGET) 7/19/2008 T/I/O = 2030/60/10. Temp = SI. Bleed tubing to CLP pre-CMIT (pre-rig). AL connected, SI C~ casing valve. ALP = 600 psi. Opened WV to bleed TP to 70 psi in 30 mins. During bleed, IA went on vac. Monitored for 30 mins, TP increased 40 psi to 110, no change in IAP. FO bled F/L to 0 psi. Final WHPs = 110/VAC/10. SV, WV shut. SSV, MV open. IA, OA otg. AL shut. 7/19/2008 T/I/O = 230/VAC/20. Temp = SI. T & IA FLs (pre-CMIT). A/L C~ 620 psi & SI @ casing valve. Flowline C~ 20 psi. Tbg FL C~ 2484' (40 Bbls). IA FL C~3 2436' (130 Bbls). TP increased 120 psi & OAP increased 20 psi overnight. SV & WV =Shut. SSV & MV =Open. IA & OA = OTG. A/L = SI ~ Casing. 7/19/2008 T/I/0=200/0/0 CMIT TxIA PASSED to 3000 si. Pumped 10 bbls 60/40 methanol, 150 bbls crude down IA to reach test pressure. 1 st 15 min lost T 1120/140 psi, 2nd 15 min lost T/I 60/50 psi for a total loss in 30 min of T/I 180/190 psi. Bled down pressure (23 bbls) FWHP's=300/0/280 Annulus and casing valves tagged and left open to gauges DSO notified of valve positions upon departure. swab= shut, wing= shut, ssv=open, master= open, IA= open, OA=open 7/20/2008 ****WELL S/I ON ARRIVAL**** LRS CMIT-Tx IA TO 3500 PSI_ PASS C 2 BAGS OF SLUGGITS ON WRP @ 9711' SLM CURRENTLY RIH W/JUNK CATCHER ***CONTINUED ON WSR 07/21/08*** 7/20/2008 T/I/0= 500/0/80 Temp=S/I CMIT TXIA 3500 psi *PASSED* (RWO prep) Pumped 24.7 bbls 80* crude down tubing to reach test pressure. 1 st 15 min TBG lost 40 psi, IA lost 20 psi, 2nd 15 min TBG lost 0 psi, IA lost 0 psi. Total in 30 min TBG lost 40 psi, IA lost 20 psi. Bled down IAP (17 bbls). Annulus casing valves tagged and left open, operator notified. SLB on well upon LRS departure. FWHP's=100/100/180 B-27A 7/21/2008 ***WELL SHUT IN UPON ARRIVAL**' T/I/O = 50/200/0 Page 2 0~ 2 POWER JET C~/2" L-80 TUBING AT 9520' IN THE FIRST FULL JOINT ABOVE THE BAKER PACKER. CURRENTLY RIH WITH JET CUTTE ***JOB IN PROGRESS AND CONTINUED ON 22-JULY-2008 WSR*** B-27A 7/21/2008 ***CONTINUED FROM WSR 07/20/08*** SET 4 1/2 JUNK CATCHER C~ 9614' MD (122" OAL, 2.99" MIN ID, 3.77" TOP OD, 3.75" BOTTOM OD) ***WELL LEFT S/I, DSO NOTIFIED OF STATUS*** B-27A 7/22/2008 ***WELL SHUT IN UPON ARRIVAL*** T/I/O = 50/200/0 POWER JET CUT 4-1/2" L-80 TUBING AT 9521' IN THE FIRST FULL JOINT ABOVE THE BAKER PACKER. WELL LEFT SHUT IN, DSO NOTIFIED. SWAB CLOSED, CASING VALVES OPEN TO GUAGES, MASTER OPEN, WING CLOSED. FINAL T/I/0=100/200/0 ***JOB COMPLETE*** B-27A 7/22/2008 T/I/0=100/0/0 Temp=S/I ***Circ-out*** Pumped 5bbls meth, 1015bb1s 9.3# Brine, 38bbls diesel down tubing, through cut, up IA, into flowline. U-tube freeze protect. ***CMIT TxIA PASSED to 3500osi.*** Pumped 6.7bbls diesel to pressure up. Tubing and IA lost 40psi 1st 15min, 20psi 2nd 15min, for a total of 60psi in 30min. Bled T and IA to zero. MIT OA to 2000 PSI PASSED Pumped 1.8 bbls 50* diesel to test. 1st 15 min loss of 80 PSI & 2nd 15 min loss of 20 PSI for a total loss of 100 PSI in 30 min. Bled OA to zero. FWHP's=0+/0+/0 Annulus casing valves left tagged & open to gauges DSO notified upon departure of valve status, Wing,Swab,A/L=S/I Master,SSV,lA,OA=open to gauges B-27A 7/23/2008 T/I/O = SSV/0/0+. Temp = SI. OA FL (RWO prep). AL line SI & locked out C~ casing valve. ALP = O psi. OA FL near surface. B-27A 7/24/2008 Set 4-1/16" CIW BPV pre 4ES. T/I/0=0/0/0, Set C~3 80" 1X2' extension used. BPV# 252. B-27A 7/24/2008 T/I/0=0/0/0. Pull 4 " CIW H BPV thru tree. Nabors 4ES B-27A 7/26/2008 T/I/0=0/0/0. Pull 4" CIW H TWC thru BOPE. Nabors 4ES B-27A 7/30/2008 ***ASSIST THE RIG*** RAN 3.70 CENT 2'1 7/8 STEM, 3.70 LIB, PASS THROUGH PACKER C~39565'SLM ,TAG SLUGGITS ~ 9695'SLM ***JOB COMPLETE RDMO*** B-27A 8/1/2008 T/I/O = O/O/O pulled 4 1/16 ciw h twc used 1 2' ext tag at 102' for rig completion no problems B-27A 8/3/2008 T/I/O = 0/0/0 Pulled 4-1/16" CIW "H" TWC #146 C~ 100" 1-2' ext. used...post-rig...no problems. B-27A 8/6/2008 ***WELL SHUT IN ON ARRIVAL*** PULLED BALL & ROD (9,430' MD) PULL ST# 3 RK-DGLV (6,184' MD), ST# 4 RKP-DCRV (3,313' MD) SET ST# 4 RK-LGLV (3,313' MD), ST# 3 RK-OGLV (6,184' MD) CURRENTLY RIH W/ 4-1/2" GS TO PULL RHC @ (9,430' MD) ~®~~ ~~~ ***CONT ON 8-07-08 WSR*** B-27A 8/7/2008 ***CONT FROM 8-06-08*** PULLED EMPTY 4-1/2" RHC (9,430' MD) BAIL FROM 9,682' - 9,693' SLM W/ 2.50" x 10' P-BAILER W/3.50" CENT BETWEEN TWO BARRELS (-7 GAL SLUGGITS) BAIL FROM 9,693' - 9,695' SLM W/ 3.0" x 10' P-BAILER W/MULE SHOE WRP EQUALIZING SUB (-1 GAL SLUGGITS) ***CONT ON 8-08-08 WSR*** B-27A 8/8/2008 ***CONT FROM 8-08-08*** BAIL FROM 9,695' TO 9,698' SLM W/ KJ, 3.0" x 10' P-BAILER W/MULE SHOE /WRP EQUAL SUB (-1-1/2 GAL SLUGGITS /MUD) BAIL W/ 1-5/8" HYDROSTATIC BAILER @ 9,698' SLM (NO RECOVERY) ATTEMPT TO LATCH 4-1/2" WRP W/ 4-1/2" WRP OVERSHOT ***CONT ON 8-09-08 WSR*** B-27A 8/9/2008 ***CONT FROM 8-08-08*** PULLED 4-1/2" WRP FROM 9698'SLM.(RECOVEREDRLL SLIPS AND ONE AND A HALF RUBBER ELEMENTS.) DRIFTED W/ 3.70"CENT.4-1/2"BLB, 2.65" WIRE GRAB TO 10,567'SLM STOP DUE TO DEVIATION. (RECOVERED 1/2"x1-1/2" PIECE OF RUBBER ELEMENT) ***RDMO,LEFT WELL SHUT IN AND TURNED OVER TO OPERATOR*** Print Date: 8/26/2008 Page 1 of 1 • ~J BP.EXPLORATION Page 1 of 5" Operations Summary Report Legal Well Name: B-27 Common Well Name: B-27 Spud Date: 7/24/2008 Event Name: WORKOVER Start: 7/24/2008 End: 8/1/2008 Contractor Name: NABOBS ALASKA DRILLING I Rig Release: 8/1/2008 Rig Name: NABOBS 4ES Rig Number: ti i f O t k C D ti D F T ~ T NPT ~ Ph d pera escr p on o ons a rom - o Hours as e ! e o ase 7/24/2008 06:00 - 10:00 4.00 RIGD P PRE Scope and lay over derrick. Prepare to move rig components to B-27A. Made 24-hr. notification to AOGCC -Lou Grimaldi, for initial BOPE test. 10:00 - 12:00 2.00 RIGU P PRE MIRU on B-27A. Spot sub, pits and pipe shed. 12:00 - 14:30 2.50 RIGU P PRE Connect lines between rig components. Raise and scope derrick. 14:30 - 15:00 0.50 RIGD P PRE PJSM -review well plan forward with all crew. 15:00 - 15:30 0.50 RIGD P DECOMP Perform housekeeping inspection of rig from crown to ground to ensure all tools and materials from annual maintenance are picked up and stowed properly so as to eliminate possibility of any incidents occurring from housekeeping errors. ACCEPTED RIG @ 15:00-HRS. 15:30 - 18:00 2.50 RIGU P DECOMP Rigging up circulating lines to Tiger tank and tree and taking on seawater to pits. Begin testing mud manifold & pop off valve. 18:00 - 18:30 0.50 RIGU P DECOMP Finish testing pop off valve on pump & pump manifolding. 18:30 - 20:30 2.00 PULL P DECOMP Wait on lubricator 1 hr. P/U lubricator & pressure test to 500 si. Pull BPV. UD BPV & lubricator. 20:30 - 21:00 0.50 PULL P DECOMP Hold pre-spud meeting w/ all hands. Hold PJSM regarding well circulation. 21:00 - 22:00 1.00 WHSUR P DECOMP Finish R/U lines to tree & pressure test lines to 3500 psi. 22:00 - 00:00 2.00 PULL P DECOMP O en well. SITP 0 si, SICP 0 si. Circulate well 5 BPM ~ 670-910 psi. Pumped total of 675 bbls. Circulated out a very small amount of gas. FCP = 670 psi. 7/25/2008 00:00 - 00:30 0.50 PULL P DECOMP Finish circulating well. FCP 670 psi. Pump total of 675 bbls. S/D well dead. Had very small amount of gas at 600 bbls. S/D. well dead. Est. 80 bbls of diesel returns. Report shows 38 bbls pumped. 00:30 - 01:30 1.00 PULL P DECOMP Monitor well. Install TWC w/ T-bar. 01:30 - 03:00 1.50 WHSUR P DECOMP Pressure test TWC from above w/ 3500 si for 10 min Ok. Prssure test TWC from below w/ 1000 psi. Ok. Charted testing. 03:00 - 05:00 2.00 WHSUR P DECOMP Bleed hanger void. Bleed control lines. N/D X-mas tree & adapter flange. Check hanger threads 4 1/2" BT-M, 9 turns. 05:00 - 21:30 16.50 BOPSU P DECOMP N/U BOPE. Continue work installing pipe skate safety system. General housekeeping. Test mud pump pressure relief valve. 21:30 - 23:00 1.50 PULL N RREP DECOMP Install new Pop off valve on pump. Adjust & test same. 23:00 - 00:00 1.00 BOPSU P DECOMP Hold PJSM. Fill stack cycle rams. R/U test equip, 7/26/2008 00:00 - 00:30 0.50 BOPSU P DECOMP Perform BOP body pressure test, 250/3500 psi. Lou Grimaldi w/ AOGCC waived witnessing test ~ 12:20 AM, 7-26-2008. 00:30 - 04:30 4.00 BOPSU P DECOMP Pressure test BOPE as per BP/AOGCC requirements. LP 250 psi, HP 3500 psi. Used 3 1/2" & 4 1/2" test jt. No failures. Also tested Dart valve & Koomey. 04:30 - 05:30 1.00 WHSUR P DECOMP P/U lubricator. Test to 500 psi. Pull TWC. UD plug & lubricator. 05:30 - 06:00 0.50 PULL P DECOMP P U landing jt. with closed TIW valve & M/U into hanger. BOLDS. Prep to pull hanger. 06:00 - 07:00 1.00 PULL P DECOMP Pull hanger free w/105K upwieght. Hoisted hanger to floor. Disconnected two control lines and recovered one SS band. Break out and lay down tubing hanger. 07:00 - 10:00 3.00 PULL P DECOMP Hook up circulating lines and CBU ~ 5.0-bpm ~ 250-psi. No gas or foreign materials in returns. Rig up control line spooler and remaining tubing handling tools. Load pipe shed with 3-1/2" drill pipe. 10:00 - 11:00 1.00 PULL P DECOMP PJSM -Review recent pipe skate modifications with all crew and Columbia skate representative. Reviewed Nabors 4ES Printed: 8/25/2008 2:08:43 PM • I~ BP EXPLORATION Page 2 of 5 Operations Summary Report Legal Well Name: B-27 Common Well Name: B-27 Spud Date: 7/24/2008 Event Name: WORKOVER Start: 7/24/2008 End: 8/1/2008 Contractor Name: NABOBS ALASKA DRILLING I Rig Release: 8/1/2008 Rig Name: NABOBS 4ES Rig Number: I Hours Task Code NPT Phase Description of Operations Date From= To 7/26/2008 10:00 - 11:00 1.00 PULL P DECOMP laying down tubing through pipe shed procedure. 11:00 - 14:00 3.00 PULL P DECOMP POH UD 4-1/2" completion tubing and spooling dual control line. Laid down 52 jts. 4-1/2" IBT-M tubing, 1 x 4-1/2" IBT-M 10' and 1 x 4-1/2" IBT-M 6' pup, 1 x 4-1/2" IBT-M 10' XO pup and 1 4-1/2" HES HXO SSSV w/10' pups. Recovered all 59 SS bands. Control line passed NORM inspection. 14:00 - 15:00 1.00 PULL P DECOMP Adjusted main drum brakes. 15:00 - 18:00 3.00 PULL P DECOMP Cont. POH w/4-1/2" completion tubing laying down 1 x 1 through pipe shed. 81 jts. laid down at 16:00-hrs. 126 jts. laid down at 18:00-hrs. 18:00 - 22:30 4.50 PULL P DECOMP Finish OOH w/ 4 1/2" BTC-M 12.6# L-80 com letion. Recovered 1-SSSV assy, 5-GLM assys. 226 jts of 4 1/2" tubing & 1 - 19.38' cut off jt. Cut was very clean & uniform OD at the belled end was 4-7/8". Noticed corrosion pitting on inside of tubes & on ins from Jt# 105. 22:30 - 23:30 1.00 PULL P DECOMP Clear & clean rig floor. R/D tubing tools. 23:30 - 00:00 0.50 PULL P DECOMP M/U & P/U kelly. 7/27/2008 00:00 - 01:30 1.50 PULL P DECOMP Finish P/U & making up kelly. 01:30 - 02:00 0.50 PULL P DECOMP Pressure test kelly. LP 250 psi, HP 3500 psi. Charted test. 02:00 - 03:30 1.50 PULL N WAIT DECOMP Wait on correct size wear bushing for 1 hr. Install Wear bushing & RILDS. (OD = 9.125") 03:30 - 06:00 2.50 FISH P DECOMP P/U & M/U BHA #1 to dress tubin stub ~ 9521' 06:00 - 06:30 0.50 FISH P DECOMP Pre-tour meeting, service rig, daily derrick inspection, check PVT's and enviro walkaround. 06:30 - 14:00 7.50 FISH P DECOMP RIH w/BHA #1 on 3-1/2" DP 1 x 1 from pipe shed. 230 jts. RIH ~ 12:30-hrs. 14:00 - 14:30 0.50 FISH P DECOMP Tag 4-1/2" tubing stub at 9518.63' with 27.22' in on jt. # 299. Reciprocate scraper from 9438' to 9493' three times. Lay down jt. 299. PU 10' DP pup and RIH. 14:30 - 18:00 3.50 FISH P DECOMP Kelly up and establish parameters. P/U wt. = 140K, S/O Wt. _ 120K, Free torque C~ 60 RPM = 150 amps, 3.0-bpm ~ 420-psi. RIH and tag stub and mill over with dress-off shoe with 5-7K WOM. Rotate and wash down to 9528' and engage tubing stub with pilot mill. Engage stub with tubing dress-off mill and mill off 6" of stub putting dress-off shoe at 9529'. Stop rotating, pick up 5' and slide down engaging pilot mill in stub and tag stub at 9519'. Pull off of stub and attempt to slide over stub with dress-off shoe. No-go. Pick back up and establish 70-RPM's. Mill off stub with dress off shoe. Stop rotating and wash down to 9529' with no downweight. Pull off of stub and attempt to slide over without rotating. Dress-off shoe slid over stub with 10K downweight. Washed down to 9529' and pulled off of stub and established rotation at 70-RPM's. Dressed off stub and washed down to 9529'. Pulled off of stub and slid back over stub with 5K downweight and continued down to 9529' with no downweight on mill. Picked up to 9528' and clsoed annular preventer and established reverse circulation. Circulated 3.5 bottoms up. Did not recover any foreign material or metal shaving across scraper. Slid back over stub with 5K downweight without rotating or circulating. Set kelly back and blow down lines. Pull 1 stand. 18:00 - 18:30 0.50 FISH P DECOMP Crew change. Inspect derrick. Check PVT alarms. Service rig. Printed: 8/25/2008 2:08:43 PM • • BP EXPLORATION Operations Summary Report Page3of5, Legal Well Name: B-27 Common Well Name: B-27 Spud Date: 7/24/2008 Event Name: WORKOVER Start: 7/24/2008 End: 8/1/2008 Contractor Name: NABOBS ALASKA DRILLING I Rig Release: 8/1/2008 Rig Name: NABOBS 4ES Rig Number: Date From - To Hours 'Task Code ~ NPT ~ Phase 7/27/2008 18:30 - 19:30 1.00 FISH P 19:30 - 22:00 2.50 FISH P 22:00 - 23:00 1.00 FISH P 23:00 - 00:00 I 1.001 FISH I P 7/28/2008 100:00 - 00:30 I 0.501 WHSUR I P 02:00 - 10:30 I 8.501 WHSUR I P 10:30 - 11:00 0.501 FISH P Description of Operations DECOMP Held PJSM. Slip & cut 84' of drilling line. DECOMP POOH & stand back 80 stands of 3 1/2" DP. DECOMP P/U storm packer & set w/ 25K ~ 35'. R/U & pressure acker to 1000 si for 10 min Ok. Charted same. DECOMP Hold weekly safety meeting w/all hands. Discussed weekly slope incidents, 4es safety issues & 8 Golden rules. Also review rig performance & report card. DECOMP Back out 2 lock down screws & pull wear bushing. UD running tool. DECOMP ND BOPE and set back stack. Begin unbolting tubing spool, casing in compression. Casing grew -11 ". Notified town engineer. Removed tubing spool. DECOMP PU 9-5/8" Itco single grapple spear and engage casing. Pull Additional 7" of upward movement in 9-5/8" casing when 135K upweight applied. Disengage and lay down spear. Note: left lockdown screws full en a ed to hold casin sli in 11:00 - 16:00 5.00 WHSUR P DECOMP FMC wellhead tech cut casing with Wachs cutter. Remove old secondary casing packoff. Install new combination secondary/primary casing packoff and new tubing spool. Torque up tubing spool studs with Sweeney torque wrench. Pressure test casing packoff to 3800-psi for 30-minutes. Held weekly safety meetig with crew. 16:00 - 18:00 2.00 BOPSU P DECOMP NU BOPE. 18:00 - 18:30 0.50 BOPSU P DECOMP Set test lu .Pressure test BOP bod & breaks. LP 250 si, HP 3500 psi. Charted testing. Notofied Lou Grimaldi w/ AOGCC, he declined to witness BOP testing ~ 17:40 hrs. 18:30 - 19:30 1.00 WHSUR P DECOMP Pulled test plug & N/D testing equip. P/U setting tool & pulled Halliburton Storm Packer. UD same. Installed ear us ing & ran in 2 lock down screws. 19:30 - 20:30 1.00 FISH P DECOMP POOH & stand back 20 stands of 3 1/2" DP. 20:30 - 21:30 1.00 FISH P DECOMP Break out & UD BHA #2. 21:30 - 23:00 1.50 FISH P DECOMP P/U & M/U BHA #3 to fish junk catcher. 23:00 - 00:00 1.00 FISH P DECOMP RIH w/ BHA # 3 on 99 stands of 3 1/2" DP 7/29/2008 00:00 - 02:30 2.50 FISH P DECOMP Con't to RIH w/ BHA #3 on 99 stands of 3 1/2" DP to fish junk catcher. 02:30 - 05:00 2.50 FISH P DECOMP P/U 99 stand &RIH. Tagged up ~ 98 stands + 1 single + 4' of 2nd single on stand 100. Tag depth = 9517'; Work pipe & attempt to shear out guide sub. Worked several times w/o success. P/U kelly Rotate & attempt to go over stub. Sheared out guide w/ 30K down, Made 1' over stub & took weight. P/U & pulled free w/ 10K over pull. Suspect GS spear along side of P/U & pull 2 stands & attempt to leave guide up hole. RIH & rotate & attempt to get in stub, No success. Plan to POOH & inspect GS spear & re-dress BHA. P/U wt= 138K, S/O Wt = 120KI. Rot Wt = 130K. Free Torq = 2.5K ft-Ibs 1 BPM C~ 520 psi. 05:00 - 09:30 4.50 FISH P DECOMP Set back kelly. POOH & stand back 3 1/2" DP. 09:30 - 10:30 1.00 FISH N DPRB DECOMP POH and break down GS spear BHA #3 standing PAC DP back.. GS spear damaged and original O.D. of 3.5" reduced to 3.00". All BHA recovered, no junk left in hole. Further inspection of the shear guide assembly and GS spear assembly showed gouges continuing up the side of the spear Printed: 8/25/2008 2:08:43 PM • A BP EXPLORATION Page 4 of 5, Operations Summary Report Legal Well Name: B-27 Common Well Name: B-27 Spud Date: 7/24/2008 Event Name: WORKOVER Start: 7/24/2008 End: 8/1/2008 Contractor Name: NABOBS ALASKA DRILLING I Rig Release: 8/1/2008 Rig Name: NABOBS 4ES Rig Number: Date From - To Hours Task Code NPT Phase ~ Description of Operations _._ 7/29/2008 09:30 - 10:30 1.00 FISH N DPRB DECOMP and crossover directly above the spear for a distance of approx. 4'. Confer with engineering and conclude that a tubing 10:30 - 12:30 2.00 FISH N DPRB DECOMP PU/MU BHA #4 - 4-1/2" tubing dress-off assembly: shoe, 2 x ext, inner mill, boot basket, XO, bumper sub, 6 x DC. 12:30 - 15:30 3.00 FISH N DPRB DECOMP RIH with dress-off BHA #4 on 99 stands 3-1/2" DP. 15:30 - 18:00 2.50 FISH N DPRB DECOMP PU kelly and established parameters: PU 138k Ib, SO 120k Ib, Rot 130k Ib, 60 rpm, 150a, 3000 Ib-ft, 5k-9k Ib WOB, 3 bpm, 440 psi. Tagged 4-1/2" tubing stub at 9518'. 18:00 - 20:00 2.00 FISH N DPRB DECOMP Held crew change and performed pre-tour checks of PVT system and derrick. Continued dressing tubing stub with same parameters to 9519'+. PU and swallowed stub three times without rotation. PU off stub with slight weight bobble. 20:00 - 21:00 1.00 FISH N DPRB DECOMP PU above tubing stub. Closed annular and reverse circulated seawater until clean returns. Pumped 5 bpm at 1150 psi. Had small amount of non-metal debris in returns. ^- 21:00 - 00:00 3.00 FISH N DPRB DECOMP LD 10' DP pup and 1 jt. POH with dress-off BHA #4, standing back 3-1/2" drill pipe. 7/30/2008 00:00 - 00:30 0.50 FISH N DPRB DECOMP Continued POH with dress-off BHA #4 on 3-1/2" DP. Stood back 99 stands DP and 2 stands drill collars. 00:30 - 03:30 3.00 FISH N DPRB DECOMP BO dress-off BHA #4. Recovered 21.4' cut jt 4-1/2" tubing, 2 x 10' 4-1/2" tubing pups, X nipple, XO and 5-7/8" OD K22 anchor I. Released fish from dress-off ass'y and LD. Minor wear marks on mill. Cleared and cleaned rig floor. 03:30 - 05:00 1.50 FISH P DECOMP PU junk catcher spear BHA #5: spear, double pin sub, XO, 5 jts PAC DP, XO, bumper sub, POS, 6 x DC. 05:00 - 06:00 1.00 FISH P DECOMP Start RIH with BHA #5 on 3-1/2" DP. 06:00 - 06:30 0.50 FISH P DECOMP Crew change. Service rig. Check PVT Alarms. 06:30 - 09:00 2.50 FISH P DECOMP Continue RIH with BHA #5 and 3 1/2" Drill Pipe. 09:00 - 10:30 1.50 FISH P DECOMP PUW = 134K. SOW = 116K. Bring Pump on line at 2 bpm/500 psi. Slowely wash down to _9,604'. Saw pump pressure increase to 1,000 psi. shut down pump. Latch Junk Catcher Sub. Work to free fish. Fish pulled loose with 30K over. Drop art and open Pump-out-Sub. Set back down on fish. Start POOH. Saw 4 - 5K drag through Packer Tailpipe. 10:30 - 18:00 7.50 FISH P DECOMP POOH with 3 1/2" drill Pipe and single down in Pipe Shed. 18:00 - 19:30 1.50 FISH P DECOMP Held crew change and performed pre-tour checks of PVT system and derrick. LD BHA #5 and 5 jts PAC drill pipe. LD GS spear, recovered and LD 'unk catcher. Pulled wear rin . 19:30 - 20:00 0.50 FISH P DECOMP Closed blind rams. Tested well bore to 1000 psi for 10 charted minutes. Test good. 20:00 - 00:00 4.00 FISH P DECOMP MIRU SWS slickline unit. Held PJSM. RIH with 3.70" LIB on slickline. Worked LIB into packer top at 9566'. Jarred once and worked LIB past XN nipple at 9612'. ~iIH and tagged slu its at 9695' with LIB. POH with LIB; photos on S-Drive. RD slickline equipment. 7/31/2008 00:00 - 02:30 2.50 BUNCO RUNCMP RU to run tubing. RU torque turn equipment, double stack tubing tongs and single joint compensator. 02:30 - 06:00 3.50 BUNCO RUNCMP Held PJSM. RIH with 4-1/2" 12.6# 13Cr80 NSCT tubin and accessories. Used Jet Lube eal Guard thread compound and torqued T connections to 3975 Ib-ft. Bakerlok'd all connections below packer. Held D1 Drill after joint #16. 26 jts run at 05:00 hrs. Printed: 8/25/2008 2:08:43 PM ~ w BP EXPLORATION Page 5 of 5 Operations Summary Report .Legal Well Name: B-27 ..Common Well Name: B-27 Spud Date: 7/24/2008 Event Name: WORKOVER Start: 7/24/2008 End: 8/1/2008 Contractor Name: NABOBS ALASKA DRILLING I Rig Release: 8/1/2008 Rig Name: NABOBS 4ES Rig Number: Date From - To 'Hours Task Code NPT Phase 7/31/2008 06:00 - 18:00 12.00 BUNCO RUNCMP 18:00 - 19:30 1.50 BUNCO RUNCMP 19:30 - 23:30 4.00 BUNCO RUNCMP 23:30 - 00:00 0.50 BUNCO RUNCMP 8/1/2008 00:00 - 02:30 2.50 BUNCO RUNCMP 02:30 - 03:30 1.00 WHSUB P RUNCMP Description of Operations Continue running 4 1/2", 12.6 Ib/ft, 13Cr-80 NSCT Completion as designed. Replaced one joint. MU tubing hanger, XO and landing joint. PU 110k Ib, SO 86k Ib. Landed tubing hanger. RILDS. RD tubing handling equipment. Reverse circulated 220 bbls hot 9.4 ppg brine followed by 460 bbls hot 9.4 ppg brine with 0.6% EC1124A corrosion inhibitor. Notified AOGCC at 19:45 hrs of pending B-18 initial BOPE test. Dropped ball/rod and allowed to fall. Pressured up tubing to 3500 psi and set packer. Held 3500 psi for 30 charted minutes. Test good. Bled tubing pressure to 1500 psi. Pressured up IA to 3500 psi and held for 30 charted minutes. Test good. Bled tubing pressure and observed DCR valve shear at 1200 psi tubing pressure. Confirmed DCR shear by circulating both ways through valve. Set TWC with T-Bar. Tested TWC from above to 3500 psi for 03:30 - 06:00 2.50 BOPSU P RUNCMP ND BOPE. 06:00 - 07:30 1.50 WHSUB P RUNCMP Nipple up Adaptor flange and test same at 5,000 psi x 30 minutes. Nlpple up Production Tree and test same at 5,000 psi x 10 minutes. 07:30 - 09:00 1.50 WHSUB P RUNCMP Pick up Lubricator and test to 500 psi. Good test. Pull TWCV. Lay down same. 09:00 - 13:00 4.00 BUNCO RUNCMP Rig up Lil' Red Services. Pressure test line. Pump a 12 bbl disel cap. Rig down LRS. Allow diesel to U-Tube. Install BPV and test from below at 1,000 psi x 10 minutes. Good test. Secure cellar. Release rig at 13:00 hrs. Printed: 8/25/2008 2:08:43 PM Schlumberger NO. 4001 Alaska Data & Consulting Services 2525 Gambell Street, Suite 400 Anchorage, AK 99503-2838 ATTN: Beth 00 - /01 Company: State of Alaska Alaska Oil & Gas Cons Comm Attn: Christine Mahnken 333 West 7th Ave, Suite 100 Anchorage, AK 99501 Field: Prudhoe Bay WII CI CD J # L D BL e ob og DescriptIOn ate oor 1-21/K-25 11226008 LDL 10/02/06 1 B-27A 11414394 LDL 09/30/06 1 M-24A 11216213 MEM PROD PROFILE 09/30/06 1 MPB-09 11212889 PROD PROF/GLS 10/06/06 1 X-08A 11414278 USIT 09/26/06 1 C-01A 11414279 USIT 09/27/06 1 K-11 11414765 USIT 10/01/06 1 A-17A 11414283 USIT 10/02/06 1 PLEASE ACKNOWLEDGE RECEIPT BY SIGNING AND RETURNING ONE COPY EACH TO: BP Exploration (Alaska) Inc. Petrotechnical Data Center LR2-1 900 E. Benson Blvd. Anchorage, Alaska 99508 , Þ'¡¡"N(\¡~n SLM~' ~~;:' tJ!;¡;;¡,¡t,';.;<¥ ~3 C Alaska Data & Consulting 2525 Gambell Street, S~"'" Anchorage, AK 99503-:t(!~:::. ATTN: Beth . " Date Delivered: c-~'c." nt, I) " Received by: r('/ i,'(irf~~:~\\~\'(\~:'; ';, ~ 10/19/06 . . ...... STATE OF ALASKA - ALASKa, ....,_ AND GAS CONSERVATION CL .... .41SSION REPORT OF SUNDRY WELL OPERATIONS 1. Operations performed: []Operation Shutdown []Stimulate [] Pull Tubing 2. Name of Operator BP Exploration (Alaska) Inc. 3. Address P.O. Box 196612, Anchorage, Alaska 99519-6612 [] Plugging [] Perforate []Alter Casing [] Repair Well []Other 4. Location of well at surface 496' SNL, 1595' WEL, Sec 31, T11N, R14E At top of productive interval 1009' NSL, 2586' EWL, Sec 29, T11N, R14E At effective depth 4820' NSL, 1933' EWL, Sec 29, T11N, R14E At total depth 434' NSL, 3379' EWL, Sec 29, T11 N, R14E Ann-Comm --- Acid 5. Type[~ well: Development [] Exploratory [] Stratigraphic [] Service 6. Datum Elevation (DF or KB) KBE = 74 feet 7. Unit or Property Name Prudhoe Bay Unit 8. Well Number B-27A 9. Permit Number / Approval No. 96-101 / 10. APl Number 50- 029-21471-01 11. Field and Pool Prudhoe Bay Field / Prudhoe Bay Pool 12. Present well condition summary Total depth: measured 11415 feet true vertical BKB 9079 feet Effective depth: measured 11370 feet true vertical BKB 9072 feet Casing Length Structural Conductor 110' Surface 2650' Intermediate 10054' Production Liner 7855' Plugs (measured) Junk (measured) Size Cemented MD 20"X30" 72 c.f. concrete 138' 13-3/8" 3720 c.f. Permafrost 2678' 9-5/8" 2198 c.f. Class 'G' 10082' 4-1/2" 255 c.f. Class 'G' 9635' - 11415' TVD BKB 138' 2676' 8463' 8134'-9072' Perforation depth: measured true vertical Open Perfs 10789-10804,10950-10970,11034-11064,11130-11160,11175-11235, 11270-11300,11330-11360 Open Perfs 8967-8972, 9007-9011,9020-9025, 9034-9037, 9039-9045, 9049-9053,9058-9063 Tubing (size, grade, and measured depth) 4-1/2" L-80 tubing to 9626' Packers and SSSV (type and measured depth) 9-5/8" Packer Baker SAB-3) @ 9566', 9-5/8" ZXP Packer (Baker) @ 9621' 4-1/2" SSSV (HES HXO) @ 2200'. 13. Stimulation or cement squeeze summary Intervals treated (measured) See Attachment Treatment description including volumes used and final pressure RECEIVED MAY 0 2 Z001 Alaska Oil & Gas Cons. Commission Anchorage 14. Prior to well operation: Subsequent to operation: Representative Daily Average Production or Iniection Data Oil-Bbl Gas-Mcf Water-Bbl Casing Pressure Tubing Pressure 15. Attachments [] Copies of Logs and Surveys run [] Daily Report of Well Operations 16. Status of well classifications as: [] Oil [] Gas [] Suspended Service i 17. I hereby certify t~at the foregoin, tl is true and correct to the best of my knowledge Signeq[~, /// /f'- ~'-! L~;~r-~to~~_.,//,~.c4_~/.,//[......~ Title Technical Assistant I Prepared By Name/Number: Form 10-404 Rev. 06/15/88 "~ ~ t~-L~ ~,~ ;'". ~ Date ~"~L//~ / De Wayne Schnorr 564-5174 Submit In Duplicate 01/30/2001 03/16/2001 B'27A DESCRIPTION OF WORK COMPLETED NRWO OPERATIONS ANN-COMM' TIFL ACID: DRIFT TUBING (PRE ACID STIM) SUMMARY 01/30/01 TIFL PASSED PRE ACID 03/16/01 DRIFTED W/3.5" SWAGE INTO LINER UNTIL STOPPED BY DEVIATION AT 10615' SLM WELL POP BY OPERATOR Fluids Pumped BBLS. ! Description I I BBL DIESEL FOR P/T I TOTAL MEMORANDUM State of Alaska Alaska Oil and Gas Conservation Commission TO: DATE: THRU FROM. SUBJECT: Julie Heusser, ~? Commissioner Tom Maunder, P. I. Supervisor o\ Jeff Jones, Petroleum Inspector January 18, 2001 Safety Valve Tests Prudhoe Bay Unit B Pad ThurSday, January 18, 2001' I traveled to BPXs B Pad and witnessed the semi annual safety valve system testing. As the attached AOGCC Safety Valve System Test Report shows I witnessed the testing of 17 wells and 34 components with 2 failures. The Pilot on well B-18 tripped below the required set point and the pilot on well B-21 was frozen. Both failures were repaired and sUcessfuily retested before I departed location. The new style pil°t insulation box fabricated using pipeline insulation installed on most wells on this pad should be installed on the remaining SVS pilots to eliminate the freeze u'p Problems evident on this pad. I also inspected the well hOuses on this pad while witnessing SVS testing. All the well houses inspeCted were clean and the equipment appeared to be in good condition. : Summary: I witnessed the SVS testing at BPXs PBU B Pad PBU B Pad, 17 wells 34 components 2 failures 5,8% failure rate 22 well house inspections ~ Attachment: SVS PBU B Pad 1-18-01 JJ X Unclassified Confidential Confidential (Unclassified if doc. removed ) SVS pBu B Pad 1-18-01 JJ.doc Alaska Oil and Gas Conservation Commission Safety Valve System Test Report Operator: BPX Operator Rep: Merv Liddelow AOGCC Rep: Jeff Jones Submitted By: Jeff Jones Field/Unit/Pad: PBF /PBU /B Pad, Separator psi: LPS 174 Date: 1/18/01 HPS 658 Well Permit Separ Set L/P Test Test Test Date Oil, WAG, GINJ, Number Number PSI PSI Tdp Code Code Code Passed GAS or CYCLE B.01 1700080 174 125 120 p P OIL B-02A 1961110 658/174 550/125 500/120 p P OIL B-03B 1870480 B-04 1700320 B-05A 1960990 B-06 1770740 174 125 120 P P OIL B-07 1780020 658 550 520 'P P OIL B-08 1780410 658/174 550/125 510/110 p P OIL B-09 1780490 B-10 1780540 174 125~ 110 P P OIL B-11 1780690 B-12A 1970090 658 550 530 p P OIL B-13A 1990570 B-14 1780930 B-15 1790190 B-16 1790250 ~B-17 1790280 B-18 1820020 658 5501 01 3 P 1/18/01 OIL B-19 1820030 174 125 120 p P OIL B-20 1821680 174 125 120 p P OIL B-21 1821760 658 550 510 2 P 1/18/01 OIL B-22 1820890 B-23A 1970590 658/174 550/125 550/120 p P OIL B-24 1821400 !B-25 1821510 174 125 115i p P OIL ~B-26B 2000570 '174 125 125 p P OIL B-27A 1961010 658/174 550/125 520/125 p p OIL B-28 1853030 · B-29 1860140 B-30 1860310 B-31 1910460 B-32A 1991180 B-33A 1931450 174 125 115 p p OIL B-34 1930370 Pad 1-18-01 JJ.xls Well Permit Separ Set L/P Test Test Test Date Oil, WAG, GIN J, Number Number PSI PSI Trip Code Code Code Passed (;AS or CVCL~ B-35 1931460 B-36 1960650658/174 550/125 540/120 p p OIL J-05B 2000180 - I Wells: 17 comPonentS: 34 Failures: 2 Failure Rate: 5.8% Remarks: The 2 failures were corrected and paSsed a retest. ~/~o/a~ pa~e 2 of 2 SVS PBU B Pad 1-18-01 JJ.xls ON OR BeFORE ¢:LO~tixtvl~M-~C PERMIT DATA 96-101 7304 96-101 SSVD AOGCC Individual Well Geological Materials Inventory Page: 1 Date: 06/09/98 T DATA PLUS RUN RECVD ClDLLIMLL/CN/GR 10115-11402 1 ~L~EPIA 11404-9978 1 06/28/96 06/28/96 96-101 BHP ~I/S EP IA 11404 -10110 1 06/28/96 96-101 CN/GR ~5/'SEPIA 11404 -9978 1 06/28/96 96-101 DLL/MLL/GR 96-101 SONIC ~I~SEPIA 11404-9978 ~-~SEP IA 11404 -9978 1 06~28/96 1 06/28/96 96-101 GR/CCL 96-101 NGP-MD L 11530-11346 ~i0118-11415 1 08/02/96 FINAL 01/08/97 96-101 NGP-TVD 96-101 CNTD ~"~8488-9069 ~L~10050-11331 FINAL 01/08/97 FINAL 02/21/97 96-101 7617 96-101 7915 .~--SCHLI/M CNTD ~PERRY GR 1 02121/97 2-6 03~05/97 96-101 PERF 96-101 PERF 96-101 PERF FINAL 06/06/97 FINAL 06119197 FINAL 11/10/97 ~10900-11200 L 10800-11150 ~0745-11030 L.R~OMPLETION DATE 10-407 --~//~. 3/ f6/ DAILY WELL OPS R ~/30 Iq~l TO 5~/.~ $,~/~ / '-?/2~ /~/{~/ Are dry ditch samples required? yes ~ And received? yes ~ Was the well cored? yes n~Analysis & description received? -yes no Are well tests required? ,,,yes ~!~ Received? yes~. // Well is in compliance ~j I~itial COMMENTS STATE OF ALASKA - ALASKA ( AND GAS CONSERVATION COM. .SSlON REPORT OF SUNDRY WELL OPERATIONS 1. Operations performed: F-] Operation Shutdown [] Stimulate I--I Plugging [~ Perforate [] Pull Tubing []Alter Casing [] Repair Well [] Other 2. Name of Operator 15. Type of well: 6. L~Development BP Exploration (Alaska)Inc. t Il'Exploratory 7. 3. Address [] Stratigraphic P.O. Box 196612, Anchorage, Alaska 99519-6612 []Service 4. Location of well at surface 8. 496' SNL, 1595' WEL, SEC. 31, T11 N, R14E 9. At top of productive interval 1009' NSL, 2586' EWL, SEC. 29, T11 N, R14E At effective depth 4820' NSL, 1933' EWL, SEC. 29, T11 N, R14E At total depth 434' NSL, 3379' EWL, SEC. 29, T11 N, R14E Datum Elevation (DF or KB) KBE = 74' Unit or Property Name Prudhoe Bay Unit Well Number B-27A Permit Number / Approval No. 96-101 10. APl Number 50-029-21471-01 11. Field and Pool Prudhoe Bay Field / Prudhoe Bay Pool 12. Present well condition summary Total depth: measured true vertical Effective depth: measured true vertical Casing 11415 feet Plugs (measured) 9079 feet 11370 feet Junk (measured) 9072 feet Length Size Cemented Structural Conductor 110' 20"x30" 8 cu yds concrete Surface 2650' 13-3/8" 3720 cu ft Permafrost Intermediate 10054' 9-5/8" 2198 cuft Class 'G' Production Liner 7855' 4-1/2" 255 cuft Class 'G' MD TVD 138' 138' 2678' 2676 1O082' 8463' 9635'-11415' 8134'-9072' Perforation depth: measured 11034'-11064';11130'-11160';11175'-11230' true vertical 9028'-9032';9041'-9044';9046'-9052' Tubing (size, grade, and measured depth) 4-1/2", 12.6#, L-80 @ 9626' Packers and SSSV (type and measured depth) Packer @ 9566' SSSV @ 2200' 13. Stimulation or cement squeeze summary Intervals treated (measured) See Attachment Treatment description including volumes used and final pressure .Itl Alaska Oil '~ i .... :.~: .~a,~ Corm. Commissio~ ORIGINAL 14. Representative Daily Average Production or Injection Data Oil-Bbl Gas-Mcf Water-Bbl Prior to well operation: 211 2692 629 Subsequent to operation: 1262 0 422 Casing Pressure Tubing Pressure 228 255 15. Attachments 16. Status of well classifications as: []Copies of Logs and Surveys run I~----I Oil F-I Gas F-ISuspended [] Daily Report of Well Operations 17. I hereb,y~.~rt~f~ that~e for/~oing i~.~,~ and_correct to the best of my knowledge Signed/'~.~-~~ MICH~ELWILDAMS v,,,,-~ ..... Title Technical Assistant III Service Date / hffff Prepared By Name/Number: Form 10-404 Rev. 06/15/88 Submit In Duplicate. B-27A DESCRIPTION OF WORK COMPLETED ADDPERF 04/18/97 SUMMARY The following additional interval were perforated using 2 7/8" guns, 6 SPF, zero orientation and 60° phasing. 10960'-10970' MD ADDPERF 05/06/97 SUMMARY The following additional interval were perforated using 2 7/8" guns, 6 SPF, zero orientation and 60/120° phasing. 10950'-10970' MD ADDPERF 11/01/97 SUMMARY The following additional interval were perforated using 2 7/8" guns, 6 SPF, random orientation and 60° phasing. 10789' -10804' MD ~..~,'e of Alaska Alaska Oil & Gas Conservation Comm. Atten' Lori Taylor 3001 Porcupine Drive Anchorage, AK 99501 Transmittal of Final Prints. Please sign and return copy to: Western Altas Logging Services Pouch 340013 Prudhoe Bay, AK 99734-0013 05-Nov-97 iWell Name Services Bluelines R/F Sepia Film 'B-27 A PFC/PERF 1 1 0 Y-24 LEAK DETECTION I 1 0': Received by'~ NOV !0 '1997 ,~,n.oh, orage Contact Rebecca Lange if you have a question concerning this transmittal at (907) 659-2816 or Fax (907) 659-2602. GeoQuest 500 W. International Airport Road Anchorage, AK 99518-1199 ATTN: Sherrie NO. 11088 Company: Field: Alaska Oil & Gas Cons Comm Attn: Lori Taylor 3001 Porcupine Drive Anchorage, AK 99501 Prudhoe Bay (Cased Hole) 6/16/97 Well Job # Log Description Date BL RF Sepia LIS Tape ~ cjw. oo~ B - 12 i~ PERFORATE RECORD/GR/CCL 970503 I 1 B-27A PERFORATION RECORD 970506 1 1 D- 1 CHEMICAL CUT RECORD 970507 I 1 D-07A GR/CCL 970504 I 1 D-07A PRODUCTION PROFILE 970504 I 1 D- 30 PRODUCTION PROFILE 970501 I 1 G-03 WHIPSTOCK SEN-rING RECORD 970505 I 1 M-05A PLUG SEa-rING RECORD 970513 I 1 N-19 (43-07-11-13) TUBING PATCH SETTING RECORD 970515 I 1 R- 13 PRODUCTION PROFILE W/DEFT 970509 I 1 R-13 DIGITAL FLUID ENTRY TOOL 970509 I 1 R-27 STATIC SURVEY PRESS/TEMP 970513 I 1 R-35 PRODUCTION PROFILE 970501 I 1 Y- 01 A PERFORATION RECORD 970505 I 1 Y-09 TUBING CUT RECORD 970508 I 1 Y-9 TUBING CUT RECORD 970511 I 1 Y-9 TUBING PUNCH RECORD 970512 1 1 X-27 PRODUCTION PROFILE 970510 I I PLEASE ACKNOWLEDGE RECEIPT BY SIGNING AND RETURNING ONE COPY EACH TO: BP Exploration (Alaska) Inc. Petrotectnical Data Center MB3-3 900 E. Benson Blvd. Anchorage, Alaska 99519-6612 Date Delivered: JUN 1 9 i9,.°,~ Schlumberger GeoQuest 500 W. International Airport Road Anchorage, Alaska 99618-1199 6/3/97 GeoQuest 500 W. International Airport Road Anchorage, AK 99518-1199 ATTN: Sherrie NO. 11067 Company: Field: Alaska Oil & Gas Cons Comm Attn: Lori Taylor 3001 Porcupine Drive Anchorage, AK 99501 Prudhoe Bay (Cased Hole) Well Job # Log Description Date BL RF Sepia LIS Tape Y-01A '~ "7"'~ C)~,, 97203 TDTP BORAX 970429 1 I 1 J-01 ~ HIGH PENETRATION GUN PERF REC. 9 7041 9 I 1 E-11~ STATIC SURVEY 970417 I 1 E-1 l~gli~ JEWELRY LOG 970417 I 1 E-35 JEWELRY LOG 97041 8 I 1 E-35 STATIC SURVEY 97041 S I 1 B-23 TBG PUNCH & CUT RECORD 970405 1 1 H- 26 PERFORATING RECORD 9704 04 I 1 A-25 TBG PUNCH RECORD 970409 I 1 H- 22 WHIPSTOCK SETTING RECORD 970403 I 1 E-34 STATIC SURVEY 97041 3 I 1 P-25 CBL. 970415 I 1 P-25 USlT - 97041 5 I 1 B-12A PLUG SET 970401 I 1 J-03 TBG PUNCHER RECORD 970404 1 1 B-27A PERFORATION RECORD 9 7041 8 I 1 Q-2 i PRODUCTION PROFILE LOG 9 70410 I I PLEASE ACKNOWLEDGE RECEIPT BY SIGNING AND RETURNING ONE COPY EACH TO: BP Exploration (Alaska) Inc. Petrotectnical Data Center MB3-3 900 E. Benson Blvd. Anchorage, Alaska 99519-6612 RECEIVED Date Delivered: Schlumberger GeoQuest "-" ..~_~¢_.. ¢) 500 W. International Airport Road' Anchorage, Alaska 99618-1199 Received b~.~)~;~'r~~'"-~ n I:! I I_1_ I I~10i S E I::! ~/I r' ~:: S WELL LOG TRANSMITTAL To: State of Alaska March 5, 1997 Alaska Oil and Gas Conservation Comm. Attn.: Loft Taylor 3001 Porcupine Dr. Anchorage, Alaska 99501 MWD Formation Evaluation Logs - B-27A, AK-MW-60071 The technical data listed below is being submitted herewith. Please acknowledge receipt by returning a signed copy of this transmittal letter to the attention of~ Jim Galvin, Sperry-Sun Drilling SeN'ices, 5631 Silverado Way, #G, Anchorage, AK 99518 1 LDWG formatted Disc with verification listing. APl#: 50-029-21471-01. 5631 Silverado Way, Suite G · Anchorage, Alaska 99518 · (907) 563-3256 · Fax (907) 563-7252 A Dresser Industries, Inc. Company 2/18/97 GeoQuest 500 W. International Airport Road An. chorage, AK 99518-1199 ATTN: Sherrie NO. 10805 Company: Field: Alaska Oil & Gas Cons Comm Attn: Lori Taylor 3001 Porcupine Drive Anchorage, AK 99501 Prudhoe Bay (Cased Hole) Well Job # Log Description Date BL RF Sepia LIS Tape B-27A 97075 CNTD 970204 I 1 1 ~ "TG / "'7 D-12 (43-23-11-13). 97054 TDTP(BORAX) 970130 I I 1 -~'7~,! (.e PLEASE ACKNOWLEDGE RECEIPT BY SIGNING AND RETURNING ONE COPY EACH TO: BP Exploration (Alaska) Inc. Petrotectnical Data Center MB3-3 900 E. Benson Blvd. Anchorage, Alaska 99519-6612 Date Delivered: Schlumberger GeoQuest 500 W. International Airport Road Anchorage, Alaska 99618-1199 D I=t I I_/I IM ES S ~ !:::! ~d ! I-- I=:: S WELL LOG TRANSMITFAL To: State of Alaska January 7, 1997 Alaska Oil and Gas Conservation Comm. Attn.: Loft Taylor 3001 Porcupine Drive Anchorage, Alaska 99501 MWD Formation Evaluation Logs B-27A, AK-MW-60071 The technical data listed below is being submitted herewith. Please acknowledge receipt by returning a signed copy of this of this transmittal letter to the attention of.' Ylrn Galvin, Sperry-Sun Drilling Services, 5631 Silverado Way, #G, Anchorage, AK 99518 B-27A: 2" x 5"MD Gamma Ray Logs: 50-029-21471-01 2" x 5" TVD Gamma Ray Logs: 50-029-21471-01 1 Blueline 1 Rev Folded Sepia 1 Blueline 1 Rev Folded Sepia 5631 Silverado Way, Suite G · Anchorage, Alaska 99518 · (9.07) 563-3256 · Fax (907) 563-7252 A Dresser Industries, Inc. Company HOWARD OKLAND Attn. ALASKA OIL + GAS CONSERVATION 3001 PORCUPINE DRIVE ANCHOP. AGE AK, 99501. Date: 24 July 1996 RE: Transmittal of Data Sent by: HAND CARRY Dear Sir/Madam, WELL - 093R-lO Enclosed, please find the data as described below: # DESCRIPTION 1 PLS FINAL BL+RF 1 CN FINAL BL+RF 1 PFC/PERF FINAL BL+RF 1 PFC/PERF FINAL BL+RF ECC No. Run ~ 1 5823.03 Run ~ 1 6271.05 Run ~ 1 6699.01 Run ~ 1 6713.03 Please sign and return to: Attn. Rodney D. Paulson Received by:t~/~ Western Atlas Logging Services 5600 B Street Suite 201 Anchorage, AK 99518 Or FAX to (907) 563-7803 Date: STATE OF ALASKA ALASK~ OIL AND GAS CONSERVATION CL,,vlMISSION WELL COMPLETION OR RECOMPLETION REPORT AND LOG 1. Status of Well Classification of Service Well [] Oil [] Gas [] Suspended [] Abandoned [] Service 2. Name of Operator 7. Permit Number BP Exploration (Alaska) Inc. 96-101 3. Address 8. APl Number P.O. Box 196612, Anchorage, Alaska 99519-6612 50-029-21471-01 4. Location of well at surface ~~[~-~;,.-~ ~ I OL~-~'~f?:;;~',~;~ 9. Unit or Lease Name 496' SNL, 1595' WEL, SEC. 31, T11N, R14E ] ...... ,, , '- ~ ~-: Prudhoe Bay Unit At top of productive interval , ~-~~-¢~. ~] :;; ~,¢~'_'.~.~,.._¢! 10. Well Number 1009'At totalNSL'depth2586' EWL, SEC. 29, T11N, R14Ei zF--~...,! ¥~.~IFIE~ ¢!~ ~ 11. FieldB'27A and Pool 434' NSL, 3379' EWL, SEC. 29, T11 N, R14E ~" .......... Prudhoe Bay Field / Prudhoe Bay i5. Elevation in feet (indicate KB, DF, etc.) 16. Lease Designation and Serial No. Pool KBE = 74'I ADL 028310 ,12. Date Spudded06/06/96 113' Date I'D' Reached 114' Date cOmp'' susp'' Or' Aband'll 5' Water depth' if OffshOre I 16' NO' Of cOmpletiOns06/10/96 ~ ~'"~'¢,~;I N/A MSLI One 17. Total Depth (MD+TVD) 118. Plug Back Depth (MD+TVD)I19. Directional Survey 20. Depth where SSSV set~l. Thickness of Permafrosl 11415 9079 FTI 11370 9072 FTI I~Yes C1No 2200' MD! 1900' (Approx.) 22. Type Electric or Other Logs Run MWD, LWD/FE, GE, DLL, CNL, BHC, SP, MLL, CAL, CDL i23. CASING, LINER AND CEMENTING RECORD CASING SETTING DEPTH HOLE SIZE VVT. PER FT. GRADE TOP BO'FrOM SIZE CEMENTING RECORD AMOUNT PULLED 20"X30" Insulated Conductor Surface 110' 36" 8 cu yds concrete 13-3/8" 72# L-80 Surface 2678' 17-1/2" 3720 cu ft Permafrost 9-5/8" 47# L-80 Surface 10082' 12-1/4" 2198 cu ft Class 'G' 7" 26# L-80 9781' 10115' 8-1/2" 330 cu ft Class 'G' 4-1/2" 12.6# CE-80 9635' 11415' 6" 255 cu ft Class 'G' 24. Perforations open to Production (MD+TVD of Top and Bottom 25. TUBING RECORD and interval, size and number) SIZE DEPTH SET (MD) PACKER SET (MD) 2-3/4" Gun Diameter, 6 spf 4-1/2", 12.6#, L-80 9626' 9566' MD TVD MD TVD 11034' - 11064' 9028' - 9032' 11130' - 11160' 9041' - 9044' 26. AO~D, FRACTURE, CEMENT SQUEEZE, ETC. 11175' - 11230' 9046' - 9052' DEPTH INTERVAL (MD) AMOUNT & K~ND OF MATERIAL USED Freeze Protected with 150 Bbls Diesel 27. PRODUCTION TEST Date First Production IMethod of Operation (Flowing, gas lift, etc.) June 25, 1996 I Gas Lift Date of Test Hours Tested PRODUCTION FOR OIL-BBL iGAs-MCF WATER-BBL CHOKE SIZE I GAS-OIL RATIO TEST PERIOD I Flow Tubing Casing Pressure CALCULATED ~ OIL-BBL GAS-MCF WATER-BBL OIL GRAVITY-APl (CORE) Press. 24-HOUR RATE 28. CORE DATA Brief description of lithology, porosity, fractures, apparent dips and presence of oil, gas or water. Submit core chips. .ECEtVED A~sk'~', 0i! & 6~.s C0r.,s. Commission Form 10-407 Rev. 07-01-80 Submit In Duplicate 29. Geologic Mark6._. 30. Formation Tests Measured True Vertical Include interval tested, pressure data, all fluids recovered Marker Name Depth Depth and gravity, GOR, and time of each phase. Sag River 10094' 8479' Shublik 10134' 8510' Top of Sadlerochit 10230' 8587' 31. List of Attachments Summary of Daily Drilling Reports, Surveys 32. I hereby certify tha,t, ~'~rego~rrect to the best of my knowledge i'Yv~Signed '~"%lq~ DanStoltz ?/~.J~',/~ ~~/'~ Title Senior Drilling Engineer Date 7- 7~- '-Z~/- --~ /~ //'~ '/'~ - [/ Prepared By Name/Number Terrie Hubble, 564-4628 INSTRUCTIONS GENERAL: This form is designed for submitting a complete and correct well completion report and log on all types of lands and leases in Alaska. ITEM 1: Classification of Service Wells: Gas injection, water injection, steam injection, air injection, salt water disposal, water supply for injection, observation, injection for in-situ combustion. ITEM 5: Indicate which elevation is used as reference (where not otherwise shown) for depth measurements given in other spaces on this form and in any attachments. ITEM 16 AND 24: If this well is completed for separate production from more than one interval (multiple completion), so state in item 16, and in item 24 show the producing intervals for only the interval reported in item 27. Submit a separate form for each additional interval to be separately produced, showing the data pertinent to such interval. ITEM 21: Indicate whether from ground level (GL) or other elevation (DF, KB, etc.). ITEM 23: Attached supplemental records for this well should show the details of any multiple stage cementing and the location of the cementing tool. ITEM 27: Method of Operation: Flowing, Gas Lift, Rod Pump, Hydraulic Pump, Submersible, Water Injection, Gas Injection, Shut-In, Other-explain. ITEM 28: If no cores taken, indicate 'none'. Form 10-407 Rev. 07-01-80 Well Name: Accept Date: SUMMARY OF DALLY OPERATIONS SHARED SERVICES DRILLING - BPX / ARCO B-27A Rig Name: Nabors 18E AFE' 4 P 0 8 2 9 05/31/96 Spud Date: 06/06/96 Release Date: 06/1 6/96 05/28/96 Pre-Sidetrack CTU Cement Plug A cement plugback was performed on the interal using the following fluids: SUMMARY Lay in 19 bbl cement plug from 10980' - 10470'. FLUIDS PUMPED BBLS DESCRIPTION 175 19 Fresh water 'G' neat cement, 41 cc/30 min. fluid loss R!:CFIVF_?, May 30 1996 (1) Rigged down Drillfloor / Derrick. May 31 1996 (2 ) Rigged down Drillfloor / Derrick. Rig moved 100 %. Rigged up Drillfloor / Derrick. Jun I 1996 (3) Rigged up Drillfloor / Derrick. Removed Hanger plug. Held safety meeting. Circulated at 9658 ft. Installed Hanger plug. Removed Xmas tree. Jun 2 1996 (4) Rigged up BOP stack. Tested All functions. Retrieved Tubing hanger. Circulated at 9658 ft. Laid down 9648 ft of Tubing. Rigged up Top ram. Tested Top ram. Installed Wear bushing. Made up BHA no. 1 . Operations Summary for: I:, _?A Jun 3 1996 (5) Singled in drill pipe to 9658 ft. Fished at 9658 ft. Pulled out of hole to 0 ft. Laid down fish. Made up BHA no. 2. R.I.H. to 9684 ft. Fished at 9684 ft. Pulled out of hole to 335 ft. Pulled BHA. Made up BHA no. 3. R.I.H. to 3000 ft. Jun 4 1996(6 ) R.I.H. to 9697 ft. Milled Production packer at 9697 ft. Circulated at 9699 ft. Milled Production packer at 9700 ft. Pulled out of hole to 335 ft. Pulled BHA. Made up BHA no. 4. R.I.H. to 2000 ft. Serviced Block line. R.I.H. to 10000 ft. Logged hole with LWD: Formation evaluation (FE) from 10000 ft to 10120 ft. Jun 5 1996 (7) R.I.H. to 10396 ft. Circulated at 10396 ft. Pulled out of hole to 10115 ft. Milled Casing at 10160 ft. Circulated at 10160 ft. Pulled out of hole to 10000 ft. Jun 6 1996 (8) Pulled out of hole to 332 ft. Pulled BHA. Removed Wear bushing. Installed Wear bushing. Ran Drillpipe to 809 ft (3.5 in OD). Ran Drillpipe in stands to 10272 ft. Batch mixed slurry - 17 bbl. Displaced slurry- 17 bbl. Pulled Drillpipe in stands to 9175 ft. Circulated at 9175 ft. Held 1500 psi pressure on 3 bbl squeezed cement. Pulled out of hole to 0 ft. Tested BOP stack. Made up BHA no. 1 . R.I.H. to 1800 ft. Jun 7 1996 (9) R.I.H. to 9850 ft. Drilled cement to 10118 ft. Drilled to 10280 ft. Circulated at 10327 ft. Pulled out of hole to 1799 ft. R.I.H. to 2600 ft. Laid down 1488 ft of 5 in OD drill pipe. Pulled BHA, Made up BHA no. 2. R.I.H. to 1800 ft. Jun 8 1996 (10) R.I.H. to 10327 ft. Drilled to 10535 ft. Circulated at 10535 ft. Pulled out of hole to 10115 ft. Fill pits with Water based mud. R.I.H. to 10535 ft. Circulated at 10535 ft. Pulled out of hole to 1805.45 ft. Pulled BHA. Made up BHA no. 3. Jun 9 1996 (11) R.I.H. to 1789 ft. Serviced Block line. R.I.H. to 10517 ft. Reamed to 10535 ft. Drilled to 10582 ft. Circulated at 10582 ft. Pulled out of hole to 1789 ft. Pulled BHA. Made up BHA no. 4. Page 2 Operations Summary for: L ,/'A Jun 10 1996 (12) R,I.H. to 10582 ft. Drilled to 10770 ft. Circulated at 10770 ft. Pulled out of hole to 1807 ft. Pulled BHA. Made up BHA no. 5. R.I.H. to 10620 ft. Reamed to 10770 ft. Drilled to 10835 ft. Jun 11 1996 (13) Drilled to 11415 ft. Circulated at 11415 ft. Pulled out of hole to 10115 ft. R.I.H. to 11415 ft. Circulated at 11415 ft. Pulled out of hole to 2000 ft. Jun 12 1996 (14) Pulled out of hole to 1803 ft. Serviced Block line. Pulled BHA. Tested BOP stack. Rigged up Logging/braided cable equipment. Ran electric logs. Jun 13 1996 (15) Ran electric logs. Rigged down Logging/braided cable equipment. Rigged up Casing handling equipment. Held safety meeting. Ran Casing to 1806 ft (4.5 in OD). Circulated at 1804 ft. Ran Casing on landing string to 10100 ft. Circulated at 10100 ft. Ran Casing on landing string to 11415 ft. Circulated at 11415 ft. Jun 14 1996 (16) Mixed and pumped slurry - 48 bbl. Retrieved downhole equipment - Rotating Liner hanger. Circulated at 9621 ft. Pulled Drillpipe in stands to 6100 ft. Circulated at 6100 ft. Pulled Drillpipe in stands to 5000 ft. Rigged down High pressure lines. Pulled Drillpipe in stands to 0 ft. Laid down 2000 ft of Drillpipe. Made up BHA no. 6. R.I.H. to 11260 ft. Drilled cement to 11330 ft. Jun 15 1996 (17) Drilled cement to 11370 ft. Circulated at 11370 ft. Tested Casing - Via annulus and string. Filter Seawater. Laid down 9559 ft of 5 in OD drill pipe. Serviced Block line. Serviced Top ram. Laid down 1780 ft of 2.875 in OD drill pipe. Tested Top ram. Ran Tubing to 6000 ft (4.5 in OD) Jun 16 1996 (18) Ran Tubing to 7400 ft (4.5 in OD). Tested Dual control line. Ran Tubing to 9641 ft (4.5 in OD). Space out tubulars. Installed Tubing hanger. Tested Tubing hanger. Rigged down BOP stack. Installed Xmas tree integral components. Removed Hanger plug. Circulated at 9626 ft. Set packer at 9566 ft with 4000 psi. Freeze protect well- 150 bbl of Diesel. Page 3 Operations Summary for: I~ ,_TA 06/22/96 Post-Rig Initial Perforation The following initial intervals were perforated using 2.75" guns, 6 spf, random orientation and 60/120° phasing. 11205' - 11235' MD 11175' - 11205' MD 11130'- 11160' MD 11034' - 11064' MD Page 4 SPER~R~_Y-SUN DRILLING SERVICES SHARED SERVICES DRILLING PBU/B-27A 500292147101 NORTH SLOPE BOROUGH COMPUTATION DATE: 7/10/96 ANCHORAGE ALASKA ' ~~ __ DATE OF SURVEY: 061196 MWD SURVEY JOB NUMBER: AK-MW-60071 PAGE 1 KELLY BUSHING ELEV. = 75.40 FT. OPER3kTOR: BP EXPLORATION TRUE SUB-SEA MEASD VERTICAL VERTICAL DEPTH DEPTH DEPTH COURS INCLN DG MN COURSE DLS TOTAL DIRECTION RECTANGULAR COORDINATES DEGREES DG/100 NORTH/SOUTH EAST/WEST VERT SECT 10093.48 8479.05 8403.65 41 52 10118.00 8497.29 8421.89 41 58 10156.52 8526.74 8451.34 38 19 10188.02 8551.93 8476.53 35 28 10220.25 8578.73 8503.33 32 0 S 87.19 E .00 1517.14N 4099.15E S 87.10 E .51 1516.32N 4115.51E S 82.66 E 12.06 1514.15N 4140.24E S 78.25 E 12.32 1511.03N 4158.88E S 73.01 E 14.04 1506.63N 4176.22E 2442 2456 2478 2494 2511 .91 .67 .01 .97 .61 10250.02 8604.30 8528.90 10280.48 8630.95 8555.55 10308.78 8655.83 8580.43 10338.74 8682.12 8606.72 10370.52 8709.98 8634.58 29 36 28 27 28 32 28 44 28 46 S 67.30 E 12.72 1501.49N 4190.55E S 59.70 E 12.67 1494.92N 4203.76E S 51.70 E 13.48 1487.33N 4214.89E S 50.90 E 1.43 1478.35N 4226.10E S 49.00 E 2.88 1468.51N 4237.80E 2526 2540 2554 2568 2583 .26 .81 .29 .63 .87 10402.67 8738.13 8662.73 29 1 10434.62 8766.03 8690.63 29 16 10467.21 8794.43 8719.03 29 30 10503.79 8826.25 8750.85 29 34 10534.05 8852.52 8777.12 29 56 S 47.80 E 1.95 1458.19N 4249.42E S 46.60 E 2.00 1447.62N 4260.84E S 47.50 E 1.51 1436.72N 4272.54E S 48.00 E .71 1424.60N 4285.89E S 48.60 E 1.54 1414.60N 4297.1iE 2599 2614 2630 2648 2663 .33 .77 .64 .56 .49 10551.52 8867.24 8791.84 35 8 10566.66 8879.20 8803.80 40 28 10598.12 8900.90 8825.50 52 9 10629.05 8917.44 8842.04 63 4 10659.56 8930.71 8855.31 65 19 S 49.00 E 29.79 1408.42N 4304.18E S 53.30 E 39.25 1402.62N 4311.41E S 56.40 E 37.83 1389.60N 4330.01E S 57.40 E 35.38 1375.37N 4351.87E S 56.60 E 7.77 1360.41N 4374.90E 2672 2682 2704 2730 2758 .84 .10 .81 .86 .29 10689.77 8942.73 8867.33 67 48 10721.65 8953.78 8878.38 71 35 10751.26 8962.94 8887.54 72 24 10781.27 8972.07 8896.67 72 9 10812.66 8981.59 8906.19 72 30 10843.54 8990.48 8915.08 74 2 10875.76 8998.90 8923.50 75 40 10908.04 9006.40 8931.00 77 26 10939.21 9012.72 8937.32 79 7 10971.10 9018.26 8942.86 80 52 S 57.00 E 8.27 1345.23N 4398.09E S 56.70 E 11.95 1328.89N 4423.11E S 53.80 E 9.70 1312.84N 4446.25E S 53.70 E .86 1295.93N 4469.30E S 53.70 E 1.11 1278.22N 4493.41E S 54.80 E 6.02 1260.95N 4517.40E S 55.00 E 5.09 1243.07N 4542.85E S 55.40 E 5.64 1225.15N 4568.63E S 55.30 E 5.40 1207.80N 4593.73E S 54.90 E 5.63 1189.84N 4619.48E 2785.97 2815.84 2843.99 2872.58 2902.49 2932.05 2963.15 2994.54 3025.05 3056.45 11001.20 9022.88 8947.48 81 27 11031.81 9027.47 8952.07 81 16 11063.50 9032.25 8956.85 81 22 11095.58 9036.62 8961.22 82 58 11126.52 9040.42 8965.02 82 54 S 54.20 E 3.00 1172.58N 4643.71E S 53.90 E 1.13 1154.82N 4668.21E S 53.70 E .68 1136.32N 4693.49E S 53.80 E 5.03 1117.52N 4719.12E S 53.80 E .26 1099.39N 4743.90E 3086.19 3116.45 3147.78 3179.56 3210.26 PAGE 2 SP~-~-~'-SUN DRILLING SERVICES ANCHORAGE ALASKA SHARED SERVICES DRILLING PBU/B-27A 500292147101 NORTH SLOPE BOROUGH COMPUTATION DATE: 7/10/96 DATE OF SURVEY: 061196 MWD SURVEY JOB NUMBER: AK-MW-60071 KELLY BUSHING ELEV. = 75.40 FT. OPERATOR: BP EXPLORATION TRUE SUB-SEA COURS MEASD VERTICAL VERTICAL INCLN DEPTH DEPTH DEPTH DG MN COURSE DLS TOTAL DIRECTION RECTANGULAR COORDINATES DEGREES DG/100 NORTH/SOUTH EAST/WEST VERT. SECT. 11158.84 9044.17 8968.77 83 47 S 54.40 E 3.31 1080.57N 4769.90E 11189.81 9047.42 8972.02 84 9 S 54.50 E 1.21 1062.66N 4794.96E 11221.88 9050.79 8975.39 83 46 S 53.60 E 3.02 1043.94N 4820.77E 11251.85 9054.11 8978.71 83 30 S 53.90 E 1.36 1026.33N 4844.79E 11283.20 9058.15 8982.75 81 41 S 54.00 E 5.75 1008.03N 4869.93E 3242.36 3273.16 3305.05 3334.84 3365.92 11314.97 9062.92 8987.52 81 1 S 53.60 E 2.45 989.48N 4895.27E 11345.99 9067.81 8992.41 80 48 S 53.00 E 2.04 971.18N 4919.83E 11369.98 9071.72 8996.32 80 26 S 52.60 E 2.25 956.87N 4938.69E 11415.00 9079.20 9003.80 80 26 S 52.60 E .00 929.90N 4973.95E 3397.33 3427.96 3451.62 3495.99 THE CALCULATION PROCEDURES ARE BASED ON THE USE OF THREE-DIMENSION MINIMUM CURVATURE METHOD. HORIZONTAL DISPLACEMENT = 5060.13 FEET AT NORTH 79 DEG. 24 MIN. EAST AT MD = 11415 VERTICAL SECTION RELATIVE TO WELL HEAD VERTICAL SECTION COMPUTED ALONG 125.71 DEG. TIE-ON SURVEY AT 10093.48' MD WINDOW POINT AT 10118.00' MD PROJECTED SURVEY AT 11415.00' MD SP=-- '-SUN DRILLING SERVICES ANCHORAGE ALASKA PAGE 3 SHARED SERVICES DRILLING PBU/B-27A 500292147101 NORTH SLOPE BOROUGH COMPUTATION DATE: 7/10/96 DATE OF SURVEY: 061196 JOB NUMBER: AK-MW-60071 KELLY BUSHING ELEV. = 75.40 FT. OPERATOR: BP EXPLORATION INTERPOLATED VALUES FOR EVEN 1000 FEET OF MEASURED DEPTH TRUE SUB-SEA MEASD VERTICAL VERTICAL DEPTH DEPTH DEPTH 10093.48 8479.05 8403.65 11093.48 9036.36 8960.96 11415.00 9079.20 9003.80 TOTAL RECTANGULAR COORDINATES MD-TVD VERTICAL NORTH/SOUTH EAST/WEST DIFFERENCE CORRECTION 1517.14 N 4099.15 E 1614.43 1118.76 N 4717.44 E 2057.12 442.69 929.90 N 4973.95 E 2335.80 278.68 THE CALCULATION PROCEDURES ARE BASED ON THE USE OF THREE-DIMENSION MINIMUM CURVATURE METHOD. SP~-~'-SUN DRILLING SERVICES ANCHORAGE ALASKA PAGE SHARED SERVICES DRILLING PBU/B-27A 500292147101 NORTH SLOPE BOROUGH COMPUTATION DATE: 7/10/96 DATE OF SURVEY: 061196 JOB NUMBER: AK-MW-60071 KELLY BUSHING ELEV. = 75.40 FT. OPERATOR: BP EXPLORATION INTERPOLATED VALUES FOR EVEN 100 FEET OF SUB-SEA DEPTH TRUE SUB-SEA MEASD VERTICAL VERTICAL DEPTH DEPTH DEPTH TOTAL RECTANGULAR COORDINATES NORTH/SOUTH EAST/WEST MD-TVD VERTICAL DIFFERENCE CORRECTION 10093.48 8479.05 8403.65 1517.14 N 4099.15 E 1614.43 10216.29 8575.40 8500.00 1507.21 N 4174.15 E 1640.89 26.46 10331.08 8675.40 8600.00 1480.66 N 4223.24 E 1655.68 14.79 10445.37 8775.40 8700.00 1444.01 N 4264.67 E 1669.97 14.29 10561.97 8875.40 8800.00 1404.39 N 4309.30 E 1686.57 16.61 10792.14 8975.40 8900.00 1289.81 N 4477.64 E 1816.74 130.17 11392.12 9075.40 9000.00 943.60 N 4956.03 E 2316.72 499.98 11413.48 9078.95 9003.55 930.81 N 4972.76 E 2334.53 17.81 THE CALCULATION PROCEDURES USE A LINEAR INTERPOLATION BETWEEN THE NEAREST 20 FOOT MD (FROM MINIMUM CURVATURE) POINTS SPERRY-SUN PBU/B-27R 500292Iq7101 061196 NORTH SLOPE BOROUGH BRILLIN6 VERTIClaL PROJECTION 5ERVIEES START TVD = 8979.05 FINISH TVD = 9079.21 SCALE IS 200 FEET/IN 8u, o0- 8600- Z Q_ L~ 8800 I-----I ~ 9000 9200 SSOS 3.13 9079.2 2~6o 2660 2860 3060 VERTICIqL SECTION 3996.02 FEET RT S 5u, OEO 17 HIN E 3260 3~6o 3680 C:\SURVET\B2?R SPERRY-bUN PBU/B-87R 500~92i~?i0i 061i96 NORTH SLOPE BOROUGH DF~ ~[ LL ~[ NO HOR I ZONTFIL PROJEET I gN o'ERV~EES START TVO = 8G79.05 FINISH TVD = 9079.21 SCALE IS 170 FEET/IN 1920 1750 1580 lqlO 12~t0 1070 900 RECEIVED JUL~2 5 1996 Alaska Oil & (3~,~ Oons. Oornr,',,ss,o, 11~115 SSB$ 3.13 qO00 L~i~O ti3t~O M510 q680 q850 DEPARTURE HORIZONTAL OISPLREENENT IS 5060.16 I 5020 ERST C: \SURVET\B27R CEIVED JUN 2 8 1995 Alaska c~ c~ ~ uo~s. uommiss[on A,3chomcje HOWARD OKLAND Attn. ALASKA OIL + GAS CONSERVATION 3001 PORCUPINE DRIVE ANCHOPJkGE AK, 99501. Date: 20 June 1996 RE: Transmittal of Data Sent by: HAND CARRY Dear Sir/Madam, Enclosed, please find the data as described below: WELL DESCRIPTION /1 DLL/MLL FINAL BL+RF ~ CN FINAL BL+RF 1 DAC FINAL BL+RF ~1 BH PRO FINAL BL+RF fl SSVD FINAL BL+RF Run # 1 Run # 1 Run # 1 Run # 1 Run # 1 ECC No. 6699.00 Please sign and return to: Attn. Rodney D. Paulson Western Atlas Logging Services 5600 B Street Suite 201 Anchorage, AK 99518 Received by: Date: p, GEIVED JUN 2. 8 199¢J A~aska Oil & Gas Cons. Comm~ion A~c~omge HOWARD OKLAND Attn. ALASKA OIL + GAS CONSERVATION 3001 PORCUPINE DRIVE ANCHORAGE AK, 99501. Dear Sir/Madam, Reference: Date: RE: 17 June 1996 Transmittal of Data ECC #: 6699.00 Sent by: HAND CARRY Data: OH-LDWG PRUDHOE BAY NORTH SLOPE, AK Enclosed, please find the data as described below: LDWG TAPE+LIS Tapes/Diskettes: 1 Run # 1 Please sign and return to: Attn. Rodney D. Paulson Western Atlas Logging Services 5600 B Street Suite 201 Anchorage, AK 99518 Received by: _ _ - Date: STATE OF ALASKA ALASKA uiL AND GAS CONSERVATION COMMISSION PERMIT TO DRILL 20 AAC 25.005 [] Drill [] Redrill Ilb. Type of well [] Exploratory [] Stratigraphic Test [] Development Oil la. Type of work [] Re-Entry [] Deepen~ [] Service [] Development Gas [] Single Zone [] Multiple Zone 2. Name of Operator 5. Datum Elevation (DF or KB) 10. Field and Pool BP Exploration (Alaska) Inc. KBE = 74' Prudhoe Bay Field / Prudhoe 3. Address 6. Property Designati.~ Bay Pool P.O. Box 196612, Anchorage, Alaska 99519-6612 ADL 028310,; 4. Location of well at surface 7. Unit or Property Name 11. Type Bond (See 20 AAC 25.025) 496' SNL, 1595' WEL, SEC. 31, T11N, R14E Prudhoe Bay Unit At top of productive interval 8. Well Number Number 2S100302630-277 849' NSL, 2445' WEL, SEC. 29, T11 N, R14E B-27A At total depth 9. Approximate spud date Amount $200,000.00 395' NSL, 1816' WEL, SEC. 29, T11N, R14E 05/28/96 12. Distance to nearest property line113. Distance to nearest well 14. Number of acres in property 15. Proposed depth (MD and TVD) ADL 028309 1816'I No Close Approach 2560 11503' MD / 9081' TVD 16. To be completed for deviated wells 17. Anticipated pressure {see 20 AAC 25.035 (e) (2)} Kick Off Depth 10111' Maximum Hole Angle 81 o Maximum surface 3300 psig, At total depth (TVD) 8800' / 4390 psig 18. Casing Program Specifications Setting Depth Size Top Bottom Quantity of Cement Hole Casing Weight Grade Coupling Length MD TVD MD TVD (include stage data) 6" 4-1/2" 12.6# 13Cr NSCC 1872' 9631' 8120' 11503' 9081' 225 sx Class 'G' 19. To be completed for Redrill, Re-entry, and Deepen Operations. Present well condition summary Total depth: measured feet Plugs (measured) true vertical feet Effective depth: measured feet Junk (measured) true vertical feet Casing Length Size Cemented MD TVD Structural Conductor Surface II~rdumcet~i°ante R E 6 E IV E D Liner MAY 2 1996 Perforation depth: measured AIIIk! Oil & 01~ i~0nB, C0mmiu~ true vertical 20. Attachments [] Filing Fee [] Property Plat [] BOP Sketch [] Diverter Sketch [] Drilling Program [] Drilling Fluid Program [] Time vs Depth Plot [] Refraction Analysis [] Seabed Report [] 20 AAC 25.050 Requirements Contact Engineer Name/Number: David Nakamura, 564-5606 Prepared By Name/Number Terrie Hubble, 564-4628 21.1 hereby certify that thccfl)regoing is tr~e,a~d ~orrect to the best of my knowledge Signed // Da~Sto,z ~(.~/'~¢-//,"C _,,~.41'¢4'H¢_~,) Title Senior Drilling Engineer Date Commission Use Only Permit Number I APl Number Approval Date I See cover letter ff (~ ~. 0 [I 50- 0 ~- ~, { ~ ?/'- 0 ~ ~.'"-¢;~ ~- ~;2.~, I for other requirements Conditions of Approval: Samples Required [] Y.e§ J;~ No Mud Log Required [] Yes I~No · Sulfide Measures,¢~'Ye's [] No Directional Survey Required ¢i~Yes [] No Hydrogen Required Working Pressure for DOPE [] 2M; []3M; [] 5M; [] 10M; [] 15M Other: 0i-~glnal Signea 8y by order of Approved By David W, Johnston Commissioner the commission Date '~,. ,'~-. Form 10-401 Rev. 12-01-85 Submit In Triplicate I Well Name: IB-27A Redrill Summary I Producer I Type of Well (producer or injector): Surface Location: 496' FNL 1,595' FEL Sec 31 T11N R14E Sadlerochit Zone 2 Lateral Start of Horizontal Location: 849' FSL 2,445' FEL Sec 29 T11N R14E End of Horizontal Location: 395' FSL 1,816' FEL Sec 29 T11N R14E I AFE Number: I 4P0829 I Rig: I Nabors 18-E IEarliest Anticipated Spud: May28,1996 I IOperating days to complete: 22 I MD= I 11,503' I ITvD: 1 9,081' I RT-GL 29.0' I KBE: _+74.0 Well Desitin (conventional, slimhole, etc.) I High angle sidetrack Formation Markers: Formation Tops MD TVD (SS) SV3 ........ Behind Pipe Ugnu ........ Behind Pipe HRZ ....... Behind Pipe Kuparuk ......... Behind Pipe Kingak ........ Behind Pipe Sag River 10080' 8388' Sidetrack from 7" liner in Sag River Shublik 10127' 8424' Top Sadlerochit 10222' 8500' TD of Well 11503' 9081' 4-1/2" solid, cemented liner point Casin!;I/Tubing Program: Hole F Csg/ ~/t/Ft 'Grade' Conn Length Top Btm SizeITb~l O.D. MD/TVD MD/TVD Zone 2 Lateral 6" I 4-1/2" 12.6# 13 Cr NSCC ~. 1,872' 9631 '/8120' 11503'/9081' Production Tubing I 4-1/2" 12.6# L'-80 · BTC-MOD 9575' 25'/25' 9600'/8100' RECEIVED MAY 2 ~ ~9~6 Alaska 0i/& Gas Cons. Commission Anchorage Cementing Program: 'Lead C~ment Tail Cement Casing/Liner Sx / Wt ! Yield Sx / Wt ! Yield Comments 4-1/2" N/A 225 / 15.7 / 1.17 Class G; 30% excess; TOC = 200' above 4-1/2" liner top Volume assumptions: Gauge hole + designated excess; 80' shoe joints; TOC as designated. Logging Program: Logs: 12-1/4" Hole N/A 8-1/2" Hole N/A 6" Hole MWD GR/Directional; Contingency DPC logs: ................... None planned. DIFL/BHC-AC/ZDL/CN/SP/G R Mud Program: Production Mud Properties: I 6" hole section: FIo-Pro Polymer Depth Density Marsh Yield 10 sec 10 min pH Fluid (PPG) Viscosity Point gel gel Loss Initial 8.8-9.0 50-60 30-40 15-20 18-24 9.5-10.5 <6 Final 8.8-9.0 50-60 30-40 15-20 18-24 9.5-10.5 <6 Hazards/Concerns Lost Circulation, differential sticking due to overbalance in Sadlerochit; H2S is possibility (although Iow risk, 225 ppm is highest level ever detected); Lost circulation possible in Zone 3 and Zone 2; High torque, if encountered, should be countered with lubricants. Directional: I KOP' I 10,111' MD Maximum Hole Angle: 81 ° 'Tangent Angle 28°/through Zone Close Approach Well: None Well Control: Well control equipment consisting of 5,000 psi W.P. pipe rams, blind rams, and annular preventer will be installed and is capable of handling maximum potential surface pressures. Diverter, BOPE and drilling fluid system schematics on file with AOGCC. RECEIVED MAY ~ ~ 1996 B-27A Operational Summary Pre-Rig Operations . . Pull the 4-1/2" SSSV. Valve is set at 2153' MD. Test the 9-5/8"packoff with emergency slips to 3500 psi. Notify an AOGCC representative prior to commencing plug-back operations. RU CT'unit. RIH with coiled tubing to 10,930' MD - 100' MD below the bottom perforation (bottom perforation at 10,826' MD). Lay a cement plug from 10,930' to 10,400' MD. This will leave cement about 270' above the top perforation (top perforation at 10,730' MD). . With an AOGCC representative on location to witness the operation, R/U slickline and tag the top of the cement to verify cement top is at least at 10,400' MD. . RIH and cut the 4-1/2" L-80 tubing with a chemical cutter in the middle of a full joint of tubing at approximately 9,650' MD. 5. Displace the tubing and wellbore to 8.5 ppg seawater. 6. Freeze protect top 2200' MD with diesel. . . . Bleed tubing and annuli pressures to zero. _ Set BPV in the tubing hanger and test from below to 1000 psi. Secure well. Remove the well house and flowlines. If necessary, level the pad and dig out the cellar. Rig Operations 1. MIRU Nabors 18-E. 2. RU lubricator, set TWC and test from top. ND tree. NU and test BOPE. . PU landing joint and pull tubing hanger and 4-1/2" tubing. Circulate freeze protect fluids from well and displace the well to seawater. Tubing is planned to be cut at +9,650' MD (just below the Otis XA sliding sleeve). POOH laying down 4-1/2" tubing. . . RIH with overshot and latch 4-1/2" tubing stub. Pull tubing free from 9-5/8" packer and POOH. LD fish. RIH and mill 9-5/8" permanent packer and retrieve same. 6. RIH with section mill. Circulate well to clean milling/sidetrack fluid. RECEIVED B-27 P&A Operational Summary Page 2/2 . , 11. 12. 13. 14. Mill section in 7" liner from _10,105'-10,155' MD. Set sidetrack kick-off plug from 10,255'-9,905' MD (SSD recommended practices). Kick off (+_10,111' MD) and directionally drill a 7" hole building angle to +_80° in Zone 2C. Drill a +_789' high angle leg (6" hole) in Zone 2C along a planned azimuth of 125°. NOT E: Inclination, azimuth and overall lateral length may be shortened by the onsite geologist. Completion operations entail 4-1/2", 13 Cr solid, cemented, perforated liner tied back into the 9-5/8" casing. 4-1/2", L-80 tubing will be run with a permanent packer set above 60° inclination. Set two way check and test to 1,000 psi. ND BOPE. NU tree and test to 5,000 psi. Freeze protect well and release rig. Drilling Hazards · Pore pressure is expected to be 8.0 ppg EMW or less in the Production interval. · B-Pad is known H2S pad; Although risk is Iow, it should be noted the highest level ever detected = 225 ppm. · Losses.have been encountered drilling the Sag River, Shublik and Sadlerochit formations on other B-Pad wells. Be prepared for losses near any faults and formation interfaces between the Sag River, Shublik and Sadlerochit. _SHAREB S R'VIC'ES' DI '- LL'i'i '6 I .... ii ii iiii £ IIII Ii i IIi i iiiiiiiiii i , , , , . I I II ,, Anadril] ........ _ ._ Schlumberger I I II ! Illllll III I I I I I1! I I B-27A (PS) (HA ST) VERTICAl SECTION VIEW o-- .. .A,~,L~,DR!Ii .... AKA-DPC Section at: ~25.7] -'i ., I " , APP tOVl D ITVD Scale.: ] inch: 200 f " - O N LY ~awn .... : 05/25/96 ~- ~ ~ . ,~ ~. Marker Identification ~ BKB SECTN INCL ' ' m ........... m ...... ...... m ...................... A) TIE-IN SURVEY ~0092 8472 2442 ',~,n ~ ] ~] __ _ '~ ..... ~ ............. ......... c)B) KDP CmvETOP OF WINDOWi 1/lO0 101061011164868482 245324~ 4t.E ) ...... ----~ m~ O) END li/IOOCUnVE ~03t2 8652 2557 27.~ ~,~, E) CUnVE 26/100 10513 8829 2651 ~7.~ ] 'T~vl~l~,B ' } .' .......... d - ' ' .... ...... F} ENO 26/100 CURVE ~0714 6944 2807 79 "l~ . .. G) TARGET 10714 8944 2807 79.97 ~ H) ESL 11403 90643486 79.E ~~. , I) TD 11503 908~ 3584 79.E ~-~.¢~ -~ ........................ ....... ~~ ~----- m-~ ~¢ ~ ......................... · ~'' ~,. .......... r . I,. 2240 2340 e440 2540 2640 2740 2840 2940 3040 3140 3240 3340 3440 3540 3640 3740 3840 3940 4040 Section Oepar[ure -- ' I m i I III m I I 0 i · i S H A F~'E D. S E'R"~/I c"E'S i i , , iiiiii iiii i i i ii i ii ii ii ii i inl Ill II II · -- 'DF~LLI'N'G ..... iiii ' - ANAr)!ILL ~kKA-DPC II·ISCALE ....... : I inch : 200 feet , JDRAWN ....... : 05/25/96 A[ PROVED I F 3R _F ERMITTI ,qG I ........... , _ ~ Marker IOent i ficat ion HO N/S E/W ON L y ~1 TIE-IN SURVEY 10092 15'BM 4099 E t I'LAI~ ,~ ~ ~---~ ~l TOP OF #INDON ,0,06 ,5,7N 4lOBE KOP CURVE ii/lO0 lOlil i517 N 411t E - D) END ",!/lO0 CURVE 10312 14B7 N 4PtB E . .__-. ~.~.~"~"= ~=_-- ..... ~ ................ El CURVE 26/i00 105i3 1436 N 4296 E .................... F) END 26/100 CURVE 10714 1346 N 4425 E G) TARGET 10714 i346 N 44~ E H) ESL !1403 950 N 4976 E 1) TD 11503 893 N 5050 E ' ~. . ~ ~ ',.. I I .... - I II ilml Anadn~ ] ] Sch ]umberger B-27A (P5) (HA ST)' PLAN VIEW i i I m · IL1 ii I £ . CLOSURE · 5134 feet at Azimuth 79.98 3400 3500 3600 3700 3800 3900 4000 4100 4200 4300 4400 4500 4600 4700 4800 4900 5000 5100 5200 EASI -> {~aOr~il (cl~7,~53.~.03 3:34 ~ P) ~ ' ~ ............... i , J\ :3 D. t~ 0 0 I 00'0 t8'6ILIS6S £9'8~899 H ~A'6[~P N 8~'[L~I [8S~ 9~98 00LB 00'II L£'££LIS6S 0I'LI~899 H 6~'8I~ R ~P'LSPI £SSZ 8LS8 ~S98 £E'EgI 00'II HSII £~'91LIS6S I£'~I~899 H SL'£IgP N I5'06~I ~SS~ L9S8 t598 ~8'0~I 00'TI H~EI LS'99LIS6S [8'681899 H 0S'T6T~ N £['IOSI LES[ 9ES8 86~8 99'III 00'II H0[I [I'I~LIS6S 69'SLI899 H L~'LLI5 N 0I'90SI £I~E 00~8 9L~8 £6'90I 00'II HEEI II'~LI~6S £L'[91899 ~ 8g'S919 N S£'60SI [0SE E858 9SS8 t9'f0I 00'II H8~I I8'8S£IS6S LE'SEI899 M EE'9£I9 N 89'9ISI SL~E E~58 9IS8 TE'£6 00'II H0~T 86'6~LI~6~ LA'6II899 ~ SL'T~I9 N 8I'9I~I 59~ 9~8 8698 ~9'96 ES'O HT~I $~'09LIS6S II'601899 H TI'III~ N 88'9ISI ~$~ EI58 9898 ~6'E6 £S'0 H69 SS'09LIS6S LL'~01899 H tt'£OI5 R S0'LISI 0S~E 8098 E898 68'E6 HI~> H69 I8'09LI~6~ 0S'960899 ~ 05'8609 ~ TS'£IST ~ 86[8 ~£~8 I8'E6 --_ -- 00I HD~ A X G~fHH~HM ~SI~ S-~flS CLa~L HJ/~J~IZ~ M~DN~f /~ ~O0£ HNkwIa-Z~aS ~OM~-SHZ~NIGMOOD ZOOS [HZaHG-~aHA NOI&D~HI~ N?IDNI # NVld A3NO DNIIAIWM]d (l lAOBddV Dda-V'~V 111~OVN¥ M~I~OHd HqMM ~MSOdOHd AS£SL85~'I+ :''~DU%6=~AUOD IA'SEI :'ze ~D~s ~A 96/~E/~0 : ..... p~d~d NOIA~DIMIINMGI MOI~Z$ -- DNIT~IHC SMDIAHHS GHHk~HS ~o~ ITT/d ~qHM q%fNOIADHHIG 09IE-DDE Xe~ IIS9-6~£ ('L06) 8IS66 ~~f ~nu~A~ q~0B qseH ~BI~c[mnIqoS II!~p~u%f ON IJ..LIW 3d Cl]AO ldd¥ Dd0'¥)4¥ llI~QYN¥ 00'0 00'0 00'0 00'9~ 00'gE 00'9~ 00' 9~ HI 00' 9~ tit 00' 9g ~g 00' 9g ~g 00' 0 ~£ 00'0 00'0 00I SI06 6806 6~'LgIIS6S 6I~L90699 H 88'SSOS N £6'E68 98S£ LO06 I806 IL'SEI 00'[T~I~6S 00'986899 H I6'SL69 N 0~'0S6 989C 0668 9906 IL'SET L6'9LEIS6S LL'E68899 H 60'~88~ ~ 09'9IOI £L~ 0L68 ~06 IL'S~I DaO0 / DMOa L6'6L £~II L6'6L £~,II L6"6L 8~II ~OH ~O~ 98'96~IS6S 09'9E9899 H 86'~E~9 H L£'9~Zt L08E 0L88 ~68 IL'S~I ~8'96SI~6~ 09'9E~899 H 86'9E~9 N t£'99£T L08E 0L88 '9~68 IL'SET ~8'96SIS6S 09'9E~899 H 86'~E99 N L£'9~I L08E 0L88 ~68 IL'SEI 6~'909I~6S ~'SI~899 H L6'~I9~ N L~'gSET 96LE L988 I~68 E9'SET E8'0~9IS6~ 89'9L£899 H 08'SL£9 N 9~'I8£I ABLE 0S88 ~E68 9E'SEI L0'~sgIs6s 96'I9£899 H 09'I9£~ N £9'S09I SOL~ £E88 L688 I8'~ET 90'~L9IS6S 90'£I~899 H 0I'£I£9 N £0'SE~I IL9E L8£8 I988 [8'£891565 £I'96E899 H E~'96~9 R 6t'9£~T IsgE SSL8 6~88 ~6'[89I~6~ 6'6'S6E899 H 8E'96E9 H 6E'gc~T 0S9~ SSL8 6E88 ~8'~0LIS6S 99'E9E899 H 0~'£9~ ~ I6'LS~I IIg~ 0898 ~SL8 L6'6L L6'6L L6'6L L~'9L O:~OI 8£ ~9 0~0I HOH~-S~VNIGHOOD AD~S SH~dH~-iH~A NOIiD~HIG N~DNI ~I~OH~ qqHM ~SOdOHd DODM MA~LaD 00I/gg ORS ooTIg~ s.&~nD aEIE ~o~ £ ~NOZ ciO& NOIA~DIMIANM~I NOI~iS ·'II- .' '-A 'isLI-C TI-0 .i FOR SUNDRY APPROVAL, ~: ? :_':::i'.'?~a'ndo, [] 8usp, '~ --~--Pl~gin--~'~ ---- '~--"~x :~n [] Perforate ~-~i.i~ Alter Casing [] Repair' ,Jell [] Pull Tubing [] Vadanc~ [] Other ;: ~E] Change Approved Program [] Operation Shutdown [] Re-Enter Suspended Well [] Stimulate Plug Backfor Sidetrack ~or 15. 'Type of well: 6. Datum Elevation (DF or KB) ~"nn /AIR.~ER~ Inr, J [] Development KBE = 83.27' AMSL f,,,,, v',,,:,o,,,*/ ..... I [] _Exploratory 7'-7 Unit or Property Nam~ J ......... I [] Stratigraphic Prudhoe Bay Unit ox 196612, Anchorage, AlasKa 99519-6612 '1 []Service ,Cation of well at surface 496' SNL, 1595' WEL, SEC. 31, T11N, R14E ,t top of productive interval 1016' SNL, 2597' EWL, SEC. 29, T11N, R14E ,t effective depth 994' NSL, 2105' WEL, SEC. 29, T11N, R14E .I total depth 992' NSL, 2038' WEL, SEC. 29, T11N, R14E 8. Well Number B-27 9. Permit Number 85-254 10. APl Number 50-029-21471 11. Field and Pool Prudhoe Bay Field / Prudhoe Bay Pool Present well condition summary Total depth: measured true vertical Effective depth: measured true vertical Casing 11165 feet Plugs (measured) 9246 feet 11072 feet Junk (measured) 9182 feet fill at 11072' MD BKB (10/89) Length Size Cemented Structural Conductor 110' 20"x30" 8 cu yds Surface 2640' 13-3/8" 3720 cu ft Intermediate 10044' 9-5/8" 2198 cu ft Production Liner 1384' 7" 330 cu ft MD 148' 2678' 10082' 9781'-11165' TVD 148' 2678' 8466' 8244'- 9246' Perforation depth: measured 10754' - 10760', 10760' - 10764', 10834' - 10840', 10854' - 10883' true vertical subsea 8876'-8883' (tWO intervals), 10834'- 10840', 8947'- 8968' R E C E IV E D Tubing (size, grade, and measured depth) 4-1/2", L-80 to 9709' with 4-1/2" tailpipe to 9816' MAY 2 8 1996 Packers and SSSV (type and measured depth) 9-5/8" TIW packer at 9709'; 4-1/2" SSSV at 2152' Attachments [] Description summary of proposal [] Detailed operations program [] BOP sketch Estimated date for commencing operation May 28, 1996 If proposal was verbally approved Name of approver Date approved 15. Status of well classifications as: [] Oil [] Gas [] Suspended Service Contact Engineer Name/Number: David Nakamura, 564-5606 Prepared By Name/Number Terrie Hubble, I hereby certify that th.e..f_, oregoing is true and. correct to the best of my knowledge' 'P~/~ C)Z~,~i~ Signed ),~,,.~ z~~~ DanSto~z _ ~._ Title Senior Drilling Engineer Date Commission Use Only ~nditions of Approval: Notify Commission~..s~3-m4:~c~e~ Plug in~ B O'~st ~proved by order of the Commission ' >rm 10-~,03 Rev. 06/15/88 .- u IApproval No. q~-//~ clearance ired 10-. ztro7 Commissioner Date d~/~2 ? ,//~{: '"'~--_ Subrrfi't In Triplicate · WELL PERMIT CHECKLIST COMPANY FIELD &'POOL ~ ~ ~ ! ~"0 INIT CLASS WELL NAME ~ ~ ; I, GEOL AREA PROGRAM: exp [] dev [] reddl~ serv [] wellbore seg [] ann. disposal para req [] UNIT# / / ~ ,J- 0 ON/OFF SHORE ~) ~ ADMINISTRATION AI~PR DATE 1. Permit fee attached ....................... (~_ N 2. Lease number appropriate ................... ,~ N 3. Unique well name and number ................. %,.Y2 N 4. Well located in a defined pool .................. (~) N 5. Well located proper distance from drlg unit boundary ..... (~] N 6. Well located proper distance from other wells ......... (~ N 7. Sufficient acreage available in ddlling unit ........... .~ N 8. If deviated, is wellbore plat included .............. ~.~ N 9. Operator only affected party ................... ~ N 10. Operator has appropriate bond in force ............ (~) N 11. Permit can be issued without conservation order ...... .('/~ N 12. Permit can be issued without administrative approval .... .~ N 13. Can permit be approved before 15-day wait ......... N APPR DATE 14. Conductor string provided ................... Y N'~ 15. Surface casing protects all known USDWs .......... Y N 16. CMT vol adequate to circulate on conductor & surf csg .... Y N 17. CMT vol adequate to tie-in long string to surf csg ....... Y N 18. CMT will cover all known productive horizons ......... (~ N 19. Casing designs adequate for C, T, B & permafrost ...... (~N 20. Adequate tankage or reserve pit ................ 21. If a re-drill, has a 10-403 for abndnmnt been approved .... Y N 22. Adequate wellbore separation proposed ........... (~ N 23. If diverter required, is it adequate ................ 24. Drilling fluid program schematic & equip list adequate .... ~ N 25. BOPEs adequate ........................ 26. BOPE press rating adequate' test to ~--"¢~¢,z~ psig. ~)N w/~PI 27. Choke manifold complies RP-53 (May 84) ....... ~--N-fJrr 28. Work will occur without operation shutdown .......... 29. Is presence of H2S gas probable ............... (_.Y,,/N GEOLOGY ~APPR DATE 30. Permit can be issued w/o.hydro~Y: ~ - N 31. Data presen~essure zones ....... .Y, N 32. Seismic~ailow gas zones ........... .Y. N 33~ore) .... . ........ Z N · Contact name/phone for weekl~ progress reporl~., ...... Y N ~exploratory on~yj REMARKS GEOLOGY: RPC ENGINEERING: COMMISSION: BEW~~..¢'/~9 DWJ JDH '~/ JDN TAB. ~--.?-~,.:-~,--- Comments/instructions: HOWAjb- A:'C'ORMS"cheklist rev 4/96 Well HistorY File APPENDIX Information of detailed nature that is not particularly germane to the Well Permitting Process but is part of the history file. To improve the readability of the Well History file and to simplify finding information, information of this nature is accumulated at the end of the file under APPENDIX. No special effort has been made to chronologically organize this category of information. Tape Subfile 2 is type: L_~ TAPE HEADER PRUDHOE BAY %INIT MWD/MAD LOGS WELL NAME: API NUMBER: OPERATOR: LOGGING COMPANY: TAPE CREATION DATE: JOB DATA JOB NUMBER: LOGGING ENGINEER: OPERATOR WITNESS: MWD RUN 2 AK-MW- 60071 TIM FLYNN JOHN RALL B-27A 500292147101 BP EXPLORATION (ALASKA) INC. SPERRY-SUN DRILLING SERVICES 24-FEB-97 MWD RUN 3 TIM FLYNN JOHN RALL MWD RUN 4 TIM FLYNN JOHN RALL MWD RUN 5 JOB NUMBER: LOGGING ENGINEER: OPERATOR WITNESS: SURFACE LOCATION SECTION: TOWNSHIP: RANGE: FNL: FSL: FEL: FWL: ELEVATION(FT FROM MSL 0) KELLY BUSHING: DERRICK FLOOR: GROUND LEVEL: WELL CASING RECORD TIM FLYNN JOHN RALL OPEN HOLE MWD RUN 6 TIM FLYNN JOHN RALL ilN - ~ IRE 496 1595 75.40 73.90 45.70 CASING MAR 05 DR~ERS 1ST STRING 2ND STRING 3RD STRING PRODUCTION STRING REMARKS: BIT SIZE (IN) SIZE (IN) DEPTH (FT) 6.000 9.625 10082.0 7.000 10115.0 11415.0 ALL DEPTHS ARE MEASURED BIT DEPTHS. ANNULAR AND CRITICAL VELOCITIES WERE CALCULATED USING POWER LAW MODEL. MWD RUNS 1 THROUGH 6 WERE DIRECTIONAL WITH SCINTILLA- TION TYPE GAMMA RAY (NGP). THE MWD PULSER SUSTAINED EXCESSIVE WEAR TO THE INTERNAL COMPONENTS DURING MWD RUN 1 DUE TO THE EXTREME FLOW RATES WHEN MILLING THE 50' WINDOW. NO DATA IS AVAILABLE FROM RUN 1 WHICH WAS LOGGED BEFORE THE WINDOW POINT. THIS WELL WAS DRILLED TO A TOTAL DEPTH OF 11415'. FILE HEADER FILE NUMBER: 1 EDITED MERGED MWD Depth shifted and clipped curves; DEPTH INCREMENT: .5000 FILE SUMMARY PBU TOOL CODE START DEPTH GR 10059.0 $ BASELINE CURVE FOR SHIFTS: GR CURVE SHIFT DATA (MEASURED DEPTH) BASELINE DEPTH 10059.5 10134.5 10140.5 10165.0 10172.5 10177.5 10186.5 10190.0 10192.0 10214.0 10237.0 10289.0 10291.5 10323.0 10327.5 10342.0 10357.5 10358.5 10370.0 10372.0 10385.0 10386.0 10410.5 10413.5 10436.0 10437.0 10460.5 10461.0 10689.0 10704.5 10806.5 10826.5 10842.0 10847.0 11171.5 11235.5 11247.5 11411.0 $ MERGED DATA SOURCE PBU TOOL CODE MWD MWD GR 10065.0 10140.0 10146.0 10170.5 10178.0 10183.5 10191.5 10195.0 10196.5 10216.0 10242.5 10292.5 10294.5 10324.0 10328.5 10342.5 10359.0 10360.0 10371.5 10373.0 10385.5 10386.5 10412.5 10415.5 10438.5 10439.5 10462.5 10463.0 10694.5 10709.5 10810.0 10830.0 10845.5 10850.5 11176.0 11239.5 11251.0 11414.5 BIT RUN NO 2 3 all bit runs merged. STOP DEPTH 11359.0 EQUIVALENT UNSHIFTED DEPTH MERGE TOP MERGE BASE 10118.0 10328.0 10328.0 10535.0 s~Aq ~IOI :q~BusI p~oos~ mnmyx~x s~Aq E9 :q~Bu~I p~oo~ mnmyuyx · ''sp~oo~ 99I ~ :~Iy~qns ~d~i smn~ep ~9L8 89 :~poD dsH 00000fi'0 = 5UTO~dS I~s~ ~ITZ ~d~i 000000'0000I = q2d~ pu~ ~II~ ~dei 000000'09~II = qqd~ q~qS ~IT~ sd~ I I0 0I£ 06 ~ pon sID clX~ dX~ q~Su~q ~ZTS EHd~ I 89 ~MM dO~ sq!u~ SSTdm~S ~poo TOOL :SSA~nD E ~ :GI qqdsp ~d~ %f~ Sl~l~f : ,~dO~IS HJ,%IOM : Xlf~ ,~OHgZl%~d : tfLE-~ : (lfiRS~) NOI,T,I~IO~IdX,~ d~ : ino' ,T, aTH$¢ ¢/ NIIOD N~ NM ND 'HD ZHL H£IM ~ZL~IHS H£~Z~ $~M dOE 'SS~d NI~q4 ~ZD~ZH 0'~I~II 0'0LLOI 0'Eg~0I 0'0LLOI 9 0'~SS0I ~ Tape Subfile 3 is type: LIS FILE HEADER FILE NUMBER: 2 RAW MWD Curves and log header data for each bit run in separate files. BIT RUN NO: 2 DEPTH INCREMENT: .5000 FILE SUMMARY VENDOR TOOL CODE START DEPTH GR 10065.0 $ LOG HEADER DATA DATE LOGGED: SOFTWARE SURFACE SOFTWARE VERSION: DOWNHOLE SOFTWARE VERSION: DATA TYPE (MEMORY OR REAL-TIME): TD DRILLER (FT) : TOP LOG INTERVAL (FT) : BOTTOM LOG INTERVAL (FT) : BIT ROTATING SPEED (RPM) : HOLE INCLINATION (DEG) MINIMUM ANGLE: MAXIMUM ANGLE: STOP DEPTH 10276.0 TOOL STRING (TOP TO BOTTOM) VENDOR TOOL CODE TOOL TYPE NGP NATURAL GAMMA PROBE $ 07-JUN- 96 ISC 4.54 DEP 2.042 / NGP 5.74 MEMORY 10328.0 10118.0 10328.0 0 28.4 41.6 TOOL NUMBER NGP 53 BOREHOLE AND CASING DATA OPEN HOLE BIT SIZE (IN): DRILLER' S CASING DEPTH (FT) : 6.000 10115.0 BOREHOLE CONDITIONS MUD TYPE: MUD DENSITY (LB/G): MUD VISCOSITY (S) : MUD PH: MUD CHLORIDES (PPM) : FLUID LOSS (C3) : RESISTIVITY (OHMM) AT TEMPERATURE (DEGF) MUD AT MEASURED TEMPERATURE (MT): MUD AT MAX CIRCULATING TEMPERATURE: MUD FILTRATE AT MT: MUD CAKE AT MT: MILL 9.10 79.0 9.8 1800 6.8 .000 .000 .000 .000 .0 68.0 .0 .0 NEUTRON TOOL MATRIX: MATRIX DENSITY: HOLE CORRECTION (IN): .00 .000 TOOL STANDOFF (IN): EWR FREQUENCY (HZ) : .0 0 REMARKS: MWD RUN 2. ss~Xq ~IOI :q~Bu~I p~oo~ mnmTx~M ss~Xq E9 :q~BusI p~oo~ mnm$uTM smn~ep ~0I~ 89 :~poo :A~mmns 6uTpoo@p ~poo uo~u~s~d$~ SI~ 00000~'0 = 6u[O~dS I8A$~ SI~ 000000'0000I = qqd~G pu~ ~T~ 000000'0S£0I = q~d~G ~S ~ITZ ~d~i 6 :sp~oosH e~e~ I~Oi ~ SZLX~ ~IOI (0 #Z~XL) GHODZH ~L~Q . 66 ~66 06 ~ I0 0I£ 06 ~ P MHdM I 89 GMM dOM ~ P Id~f~f I 89 GMM ~© I pon sIO ctKL clKL q~Busq ~zTs A~D A~D Boq S~TU~ saIdmes apoD IOO£ amen :ssA~no ~ ZdOqS HLHON : X~ ZOHflflHd : (tf)tS~) NOIL~OqdXZ dff : NZiOD N~ NM ND 0 0' : (~I) ,~,~O~N~S qO0~ 000 ' 00' : (~I) NOIIOHHHOO ~qOH :XilSM~ XIH~ :XIHI~ ~OO~ NO~LDZN . O' 9'8S O' 000 ' 000 ' 000 ' 000 ' 8'9 O00E I'6 0'6L 0I'6 0'~IIOI 000'9 : (,L~) HLdZQ ~NIS%fD S ,%tZ~I~II%tG : (NI) ZZIS iI~ Z~IOH NZ~O ~f,l,%f~ ©NIS~fD (~N-~ Z~IOHZ%tO~ ZdX,I, ~IO0,1, ZQOD ~IOOJ5 %tO~NZA (MOLLOS OJ, dOi) DMI~£S ~IO0,1. S'6E S'8~ 0 0'~£~0I 0'8~£0I 0'S£~0I dON / P~'P DSI 96-Ng12- 80 0'6£P0I HLdZ~ · s~IT~ ~jexedss uT unx 2Tq qo~ xog ~2~p x~pmsq 6oI pue S~AxnD EZGIfZH ZqI~ ss~Xq ~IOI :q~Su~I p~oo~ mnmTx~M s~Xq E9 :q~BusI p~oo~ mnmTUTM · ''sp~oo$~ IA ~ :sIT~qns smn~p 89SOI 89 :~poD d~ :A~mmns 6u~poo~p ~poo uo~2~2u~s~d~ SI~ O0000S'O = 6UTo~ds IsA~ sITZ O00000'OSSOI = q;d~Q pu~ ~IT~ O00000'OSSOI = q;d~G ;~S ~ITZ 66 S66 06 5 I0 0I£ 06 5 ~ ~H~ I 89 GMM dOE E ~ Id~z~f I 89 ~MM E~ I poM sIO dXL cL{£ q26usq azTs AID A~O 60% S~TUQ s~Idmes spoD IOOi ~m~N :SSA~nD E ~ :GI q2dsp (~9 #ZdX£) Q~ODZ~ i~O~ ~ ~fZ S~I~f : ZdO~IS HLHOM : X~fS ZOH~flHd : ~f£~-5 : (~f~S~f) MOIi~f~O~IdXZ dS : N_n_OD N~ NM ND Tape Subfile 5 is type: LIS FILE HEADER FILE NUMBER: 4 P~AW MWD Curves and log header data for each bit run in separate files. BIT RUN NO: 4 DEPTH INCREMENT: .5000 FILE SUMMARY VENDOR TOOL CODE START DEPTH GR 10479.0 $ LOG HEADER DATA DATE LOGGED: SOFTWARE SURFACE SOFTWARE VERSION: DOWNHOLE SOFTWARE VERSION: DATA TYPE (MEMORY OR REAL-TIME): TD DRILLER (FT) : TOP LOG INTERVAL (FT) : BOTTOM LOG INTERVAL (FT) : BIT ROTATING SPEED (RPM) : HOLE INCLINATION (DEG) MINIMUM ANGLE: MAXIMUM ANGLE: STOP DEPTH 10544.0 TOOL STRING (TOP TO BOTTOM) VENDOR TOOL CODE TOOL TYPE NGP NATURAL GAMMA PROBE $ 09-JUN-96 ISC 4.54 DEP 2.042 / NGP 5.74 MEMORY 10582.0 10535.0 10582.0 0 29.6 35.1 TOOL NUMBER NGP 297 BOREHOLE AND CASING DATA OPEN HOLE BIT SIZE (IN): DRILLER' S CASING DEPTH (FT) : 6.000 10115.0 BOREHOLE CONDITIONS MUD TYPE: MUD DENSITY (LB/G): MUD VISCOSITY (S) : MUD PH: MUD CHLORIDES (PPM) : FLUID LOSS (C3) : RESISTIVITY (OHMM) AT TEMPERATURE (DEGF) MUD AT MEASURED TEMPERATURE (MT): MUD AT MAX CIRCULATING TEMPERATURE: MUD FILTRATE AT MT: MUD CAKE AT MT: LSND- LT 8.90 90.0 8.1 42000 5.4 .000 .000 .000 .000 .0 53.9 .0 .0 NEUTRON TOOL MATRIX: MATRIX DENSITY: HOLE CORRECTION (IN): .00 .000 TOOL STA/qDOFF (IN) : EWR FREQUENCY (HZ) : .0 0 REMARKS: MWD RUN 4. CN WN FN COUN STAT : BP EXPLORATION (ALASKA) : B-27A : PRUDHOE BAY : NORTH SLOPE : ALASKA * FORMAT RECORD (TYPE# 64) ONE DEPTH PER FRAME Tape depth ID: F 2 Curves: Name Tool Code Samples Units 1 GR MWD 68 1 AAPI 4 2 ROP MWD 68 1 FPHR 4 API API API API Log Crv Crv Size Length Typ Typ Cls Mod 4 90 310 01 1 4 90 995 99 1 * DATA RECORD (TYPE# 0) 1014 BYTES * Total Data Records: 4 Tape File Start Depth = 10600.000000 Tape File End Depth = 10450.000000 Tape File Level Spacing = 0.500000 Tape File Depth Units = Feet **** FILE TRAILER **** LIS representation code decoding summary: Rep Code: 68 3008 datums Tape Subfile: 5 67 records... Minimum record length: Maximum record length: 62 bytes 1014 bytes 0 O' : qOO,T. 000 ' 00' :(MI) NOIED~HHOD ~OH :XEISNZ~ XIHE~ :XIHEtfN qOOE NOHifl~N o O' 6'£S O' 000 ' 000 ' 000 ' 000 ' 5'S 0000~ ~'8 O'OL 06'8 OHcI - 0'SITOT 000'9 : (MI) ZZIS LIE Z~OH NZdO L6~ HZ~MON qOOE 9'IA fi'05 0 0'0LLOI 0'g8SOI 0'0£LOI PS'P DSI 96-NflP- 60 ZdX,L ~IOOi ZGOD ~IOOi HOGMZA (NO,LEO~ Oi dOE) ©MIHES ~IOOi O'ST£OT dOES (©ZG) NOIEVMI~DMI ZqOH : (iZ) ~I~fAHZEMI ©0~ NOiiO~ : (i~) ~VAHZEMI ©0~ dOE : (i~) HZq%I~G GL :MOISHZA Z%BfME~OS Z%OHNMOG :NOISHZA Z~ML~OS Z~ML~OS :~ZDDOq O'~SOI X~S ZqI~ O00S' :LMZMZ~DNI HL~Z~ S :0~ ~ LI~ SIq :~dXq sT 9 sIT~qns s~Xq ~IOI :M~Bu~I p~oo~ mnmTxeM s~Xq ~9 :M~Bu~i p~oo~ mnmyuyM · ''sp~oo~ IL 9 :~Iy~qns ~d~L smn2~p ~££~I 89 :~poo :J~Pmmns 6u~poo~p ~poo uo~P~u~s~d~ SI~ O0000E'O = 5uTo~dS Ia~ eIT~ 000000'00~0I = q~dsG pu~ sIT~ 000000'0080I = M~dsG ~S ~ITg sd~i 8 :sp~oosH e~m~ Ie~OL ~ SZLX~ 5IOI (0 #ZdXi) GHODZH VL~G ~ 66 S66 06 5 I0 0I£ 06 ~ ~ HHd~ I 89 Q_M_N ~OH E ~ Id~nf I 89 QMN H© I pon sIO d~i dKi q~6ue% eZTS s~TuO ssIdmmS epoD IOOi ~meM :s~A~no 5 ~ :QI q~dep sdei ~O{ S~f~ : ZdO~IS HLHON : X%f~ ZOHfIfl%Id : ~fL ~-~t : (%f/~S~r~f) NOI£~rHO~IdXZ d~t : N. nOD N~ NM ND '9 NIlE QMM :SM~,WH 0 0' : (MI) Z~OCKXl%f. LS ~IOO~ 000 ' 00' : (MI) MOILDZHHOD Z~OH . O' £'£9 O' 000 ' 000 ' 000 ' 000 ' 000£P I'6 0'SA 00'6 OHd - 0~I,~ 0'SIIOI 000'9 : (£,~) HLdZCI ©MIS~fD S ,HZ~I~IIH~ :(MI) ,qZIS ,T,I~t Z~IOH MZdO ~fi%f~ ©MI S~fO ~N-~f Z~IOHZHO~ ZdX,T, ~IOOi Z(IOD ~IO0,T, HOJMZA (MOL,T,O~ O,T, dOi) ©MIH,T,S ~IOO,T, 8'£8 0 0'SI~II 0'0LLOI 0'SI~II ~S'~ DSI 96-NflD-II 0'E9£II HLdZ~ · sai7~ s~das uT un~ ~Tq qo~s ~o~ e~ep ~p~aq 6oI pue ssA~no GM~ Mtf~ HZCSfZH Z~IM SIq :adX~ s! £ @iy~qns @del CN WN FN COUN STAT : BP EXPLORATION (ALASKA) : B-27A : PRUDHOE BAY : NORTH SLOPE : ALASKA * FORMAT RECORD (TYPE# 64) ONE DEPTH PER FRAME Tape depth ID: F 2 Curves: Name Tool Code Samples Units 1 GR MWD 68 1 AAPI 4 2 ROP MWD 68 1 FPHR 4 API API API API Log Crv Crv Size Length Typ Typ Cls Mod 4 90 310 01 1 4 90 995 99 1 * DATA RECORD (TYPE# 0) 1014 BYTES * Total Data Records: 19 Tape File Start Depth = 11460.000000 Tape File End Depth = 10700.000000 Tape File Level Spacing = 0.500000 Tape File Depth Units = Feet **** FILE TRAILER **** LIS representation code decoding summary: Rep Code: 68 7572 datums Tape Subfile: 7 82 records... Minimum record length: 62 bytes Maximum record length: 1014 bytes Tape Subfile 8 is type: LIS 97/ 2/24 01 **** REEL TRAILER **** 97/ 2/24 01 Tape Subfile: 8 2 records... Minimum record length: 132 bytes Maximum record length: 132 bytes End of execution: Mon 24 FEB 97 9:50a Elapsed execution time = 2.31 seconds. SYSTEM RETURN CODE = 0 SLOL6 : ON ~t~O~IS H.T.~ON '. H~iIO~O~ A¥~ ~OH~i]~t~t : HAWN Cq~I~I NOI. r.v~ro~IdX~ d~ :WNVN ANVdI40D LIS Tape Verification Listing Schlumberger Alaska Computing Center 18-FEB-1997 12:03 PAGE: **** REEL HEADER **** SERVICE NAM~ : EDIT DATE : 97/02/18 ORIGIN : FLIC REEL NAME : 97075 CONTINUATION # : PREVIOUS REEL COMY~ENT : BP EXPLORATION, PRUDHOE BAY, B-27A, API #50-029-21471-01 **** TAPE HEADER **** SERVICE NAME : EDIT DATE · 97/02/18 ORIGIN . FLIC TAPE NAME : 97075 CONTINUATION # : 1 PREVIOUS TAPE : COMMENT . BP EXPLORATION, PRUDHOE BAY, B-27A, API #50-029-21471-01 TAPE HEADER PRUDHOE BAY CASED HOLE WIRELINE LOGS WELL NAME: B-27A API NUMBER: 5002921471 O1 OPERATOR: BP EXPLORATION LOGGING COMPANY: SCHLUMBERGER WELL SERVICES TAPE CREATION DATE: 14-FEB-97 JOB NUMBER: 97075 LOGGING ENGINEER: S. DECKERT OPERATOR WITNESS: S. WHIPP SURFACE LOCATION SECTION: 31 TOWNSHIP: 1 iN RANGE: 14E FNL: 496 FSL : FEL : 1595 FWL: ELEVATION (FT FROM MSL O) KELLY BUSHING: 75.40 DERRICK FLOOR: 73.90 GROUND LEVEL: 45.70 WELL CASING RECORD 1ST STRING 2ND STRING 3RD STRING PRODUCTION STRING OPEN HOLE CASING DRILLERS CASING BIT SIZE (IN) SIZE (IN) DEPTH (FT) WEIGHT (LB/FT) 9.625 10082.0 47.00 7.000 10160.0 29.00 4.500 9626.0 12.60 4.500 11415.0 12.60 CURVE SHIFT DATA - ALL PASSES TO STANDARD (MEASURED DEPTH) LIS Tape Verification Listing Schlumberger Alaska Computing Center 18-FEB-1997 12:03 BASELINE CURVE FOR SHIFTS LDWG TOOL CODE: DAS LDWG CURVE CODE: GR RUN NUMBER: PASS NUMBER: DATE LOGGED: LOGGING COMPANY: BASELINE DEPTH 88888.0 11302.5 11299.5 11286.0 11272.0 11257.0 11246.5 11239.0 11223.0 11183.0 11163 0 11160 0 11150 5 11149 5 11131 5 11124 5 11123,0 111175 111115 11111,0 11098.0 11068.0 11063.5 11054.0 11049.5 11047.5 11045.0 11013.0 10993.5 10980.5 10971.5 10956.5 10906.5 10901 5 10887 0 10875 0 10845 0 10844 5 10824 0 10817.0 10811.5 10810.0 10802.0 10763.5 10763.0 .......... EQUIVALENT UNSHIFTED DEPTH .......... GRCH CNTD 88889.0 88885.5 11300.5 11271.0 11255.5 11243.5 11237.0 11181.0 11159.5 11148.5 11124.0 11118.5 11110.0 11098.5 11066.5 11063.5 11047.5 11012.5 10993.0 10979.5 10955.5 10906.5 10888.0 10844.0 10815.5 10810.0 10801.5 10761.0 11300.0 11282.5 11221.5 11180.5 11160.0 11148.5 11132.5 11124.0 11110.0 11051.5 11047.5 11044.0 10970.0 10899.5 10873.5 10844.0 10822.0 10810.5 10761.0 PAGE: LIS Tape Verification Listing Schlumberger Alaska Computing Center 10753.5 10749.5 10737.5 10736.5 10730.0 10715.0 10711.5 10706.0 10704.5 10703.0 10702 0 10685 5 10669 0 10668 5 10657 5 10655 5 10647 0 10641 5 10631.5 10618.5 10602.0 10600.5 10597.0 10588.5 10587.5 10575.5 10571.0 10565.5 10565.0 10538.5 10532.0 10526.0 10518.0 10506.0 10488.0 10459.5 10448.0 10447.5 10438.0 10437.5 10418.0 10415.0 10414.0 10409.5 10409.0 10400.0 10389.5 10387.5 10385.5 10381.0 10378.5 10373.0 10359.0 10346.0 10345.0 10341.5 10749.5 10737.0 10730.0 10716.0 10710.5 10705.5 10703.0 10700.5 10685.5 10666.5 10655.0 10641.0 10632.0 10602.5 10596.5 10587.0 10570.5 10564.5 10530.0 10505.0 10459.0 10448.0 10437.0 10416.0 10413.5 10408.5 10400.0 10389.0 10385.0 10380.5 10372.5 10358.5 10344.5 10749.0 10733.0 10703.0 10666.0 10655.0 10645.5 10616.5 10599.0 10587.0 10573.5 10564.5 10538.0 10526.0 10517.0 10487.0 10459.0 10448.0 10437.0 10413.5 10409.0 10386.5 10380.5 10378.0 10372.0 10358.5 10344.5 10340.5 18-FEB-1997 12:03 PAGE: LIS Tape Verification Listing Schlumberger Alaska Computing Center 18-FEB-1997 12:03 10340.5 10340.0 10327.5 10326.5 10326.5 10326.5 10316.5 10316.0 10294.5 10291 . 5 10292.0 10291 . 5 10282.0 10281.5 10278.0 10275.5 10274.5 10274.0 10271.0 10269.5 10270.5 10269.5 10244.5 10243.0 10243.5 10243.0 10238.0 10237.0 10237.5 10237.0 10231.0 10230.5 10230.5 10230.5 10226.0 10225.5 10225.0 10223.5 10215.5 10214.5 10215.0 10214.0 10204.0 10202.5 10203.0 10202.5 10193.5 10193.0 10191.5 10190.5 10190.5 10190.5 10187.0 10186.0 10183.5 10182.0 10178.0 10178.0 10173.0 10172.5 10165.0 10165.0 10165.0 10160.0 10159.0 10152.0 10151.0 10151.5 10151.0 10142.0 10141.0 10141.5 10141.0 10136.0 10134.5 10135.0 10134.5 10126.5 10127.0 10120.5 10121.5 100.0 101 . 0 98.5 $ REMARKS: CONTAINED HEREIN IS THE CNTD DATA ACQUIRED ON BP EXPLORATION WELL B-27A. THE DEPTH SHIFTS SHOWN ABOVE REFLECT CORRELATIONS BETWEEN GRCH PASS #1 AND GR.DAS; AND NPHI PASS #1 AND GR.DAS. ALL OTHER CNTD CURVES WERE CARRIED WITH THE NPHI SHIFT. $ $ PAGE: LIS Tape Verification Listing Schlumberger Alaska Computing Center 18-FEB-1997 12:03 PAGE: **** FILE HEADER **** FILE NAME : EDIT .001 SERVICE : FLIC VERSION : O01CO1 DATE : 97/02/18 MAX REC SIZE : 1024 FILE TYPE : LO LAST FILE : FILE H~ER FILE N-OFZ~ER: 1 EDITED CO~RVES Depth shifted and clipped curves for each pass in separate files. PASS--ER: 1 DEPTH INCREMENT: 0.5000 FILE S~Y LDWG TOOL CODE START DEPTH STOP DEPTH GRCH 11307.0 10050.0 CNTD 11332.0 10050.0 $ CURVE SHIFT DATA - PASS TO PASS (MEASURED DEPTH) BASELINE CURVE FOR SHIFTS LDWG CURVE CODE: PASS NUMBER: BASELINE DEPTH $ .......... EQUIVALENT UNSHIFTED DEPTH .......... GRCH CNTD .............. REMARKS: THIS FILE CONTAINS CNTD PASS #1. THERE WERE NO PASS TO PASS SHIFTS APPLIED TO THIS DATA. $ LIS FORMAT DATA ** DATA FORMAT SPECIFICATION RECORD ** ** SET TYPE- 64EB ** .............................. TYPE REPR CODE VALUE 1 66 0 2 66 0 3 73 44 4 66 1 LIS Tape Verification Listing Schlumberger Alaska Computing Center 18-FEB-1997 12:03 PAGE: TYPE REPR CODE VALUE 5 66 6 73 7 65 8 68 0.5 9 65 FT 11 66 23 12 68 13 66 0 14 65 FT 15 66 68 16 66 1 0 66 0 ** SET TYPE - CHAN ** NAME SERV UNIT SERVICE API API API API FILE NUMB NUMB SIZE REPR PROCESS ID ORDER # LOG TYPE CLASS MOD NUMB SAMP ELEM CODE (HEX) O0 000 O0 0 1 1 1 4 68 0000000000 DEPT FT 505978 NPHI CNTD PU-S 505978 O0 000 O0 0 1 1 1 4 68 0000000000 NRAT CNTD 505978 O0 000 O0 0 1 1 1 4 68 0000000000 CRAT CNTD 505978 O0 000 O0 0 1 1 1 4 68 0000000000 NCNT CNTD CPS 505978 O0 000 O0 0 1 1 1 4 68 0000000000 FCNT CNTD CPS 505978 O0 000 O0 0 1 1 1 4 68 0000000000 CFTC CNTD CPS 505978 O0 000 O0 0 1 1 1 4 68 0000000000 CNTC CNTD CPS 505978 O0 000 O0 0 1 1 1 4 68 0000000000 GRCH CNTD GAPI 505978 O0 000 O0 0 1 1 1 4 68 0000000000 TENS CNTD LB 505978 O0 000 O0 0 1 1 1 4 68 0000000000 CCL CNTD V 505978 O0 000 O0 0 1 1 1 4 68 0000000000 ** DATA ** DEPT. 11329.500 NPHI. CNTD 19.663 NRAT. CNTD 3.507 CRAT. CNTD NCNT. CNTD 4761.553 FCNT. CNTD 1184.573 CFTC. CNTD 1160.090 CNTC. CNTD GRCH. CNTD -999. 250 TENS. CNTD -65. 000 CCL. CNTD O. 000 DEPT. 10048.500 NPHI. CNTD 64.528 NRAT. CNTD 8.667 CRAT. CNTD NCNT. CNTD 1817. 372 FCNT. CNTD 209. 607 CFTC. CNTD 199. 471 CNTC. CNTD GRCH. CNTD -999. 250 TENS. CNTD -65. 000 CCL. CNTD O. 000 3.708 4847.213 8. 988 1854. 772 ** END OF DATA ** LIS Tape Verification Listing Schlumberger Alaska Computing Center 18-FEB-1997 12:03 PAGE: **** FILE TRAILER **** FILE NAME : EDIT .001 SERVICE · FLIC VERSION : O01CO1 DATE : 97/02/18 MAX REC SIZE : 1024 FILE TYPE : LO LAST FILE : **** FILE HEADER **** FILE NAM~ : EDIT .002 SERVICE . FLIC VERSION : O01CO1 DATE : 97/02/18 MAX REC SIZE : 1024 FILE TYPE : LO LAST FILE : FILE HEADER FILENUM~ER: 2 EDITED CURVES Depth shifted and clipped curves for each pass in separate files. PASS NUMBER: 2 DEPTH INCREMENT: 0.5000 FILE SUMMARY LDWG TOOL CODE START DEPTH STOP DEPTH GRCH 11307.0 10050.0 CNTD 11332.0 10050.0 $ CURVE SHIFT DATA - PASS TO PASS (MEASURED DEPTH) BASELINE CURVE FOR SHIFTS LDWG CURVE CODE: GRCH PASS NUMBER: 1 BASELINE DEPTH 88888 0 11322 5 11302 5 11298 0 11296 0 11294 0 11288 0 11283 0 11271 0 11270 0 11257 5 .......... EQUIVALENT UNSHIFTED DEPTH .......... GRCH CNTD .............. 88885.0 88884.5 11295.0 11292.0 11282.0 11271.0 11255.5 11319.0 11299.0 11290.5 11284.0 11267.0 LIS Tape Verification Listing Schlumberger Alaska Computing Center 18-FEB-1997 12:03 PAGE: 11253. 11252. 11244. 11243. 11239. 11226. 11212. 11204. 11182. 11182 11172 11167 11163 11162 11155 11151 11150 11132 11132 11126 11123 11110 11098 11094 11081 11069 11067 11065 11058 11052 11034 11032 11027 11026 11013 10989 10982 10981 10972 10967 10963 10953 10952 10937 10933 10931 10928 10924 10907 10902 10895 10887 10877 10859 10856 0 11250.0 0 11251.5 5 11243.0 0 11240.5 0 11236.5 5 11224.0 0 11209.5 5 11202.0 11201.5 5 11179.0 0 11179.5 5 11169.0 0 11165.5 5 11159.5 5 11160.0 5 11153.5 5 11148.5 0 11148.5 5 11131.0 0 11132.5 0 11124.5 5 11124.0 5 11110.0 0 11098.5 5 11092.0 5 11083.0 5 11070.5 5 11065.0 0 11062.0 5 11055.0 0 11050.5 0 11032.5 5 11030.0 5 11026.5 0 11023.0 0 11012.0 11010.5 0 10987.0 0 10979.5 0 10979.0 5 10970.0 0 10965.0 5 10963.0 10961 . 0 0 10950.0 5 10952.5 0 10936.5 5 10931.0 0 10928.0 0 10926.0 0 10924.5 5 10904.0 5 10903.5 0 10892.0 5 10887.5 0 10873.5 5 10860.0 0 10854.5 ~ 18-FEB-1997 12:03 PAGE: 9 LIS Tape Verification Listing Schlumberger Alaska Computing Center 10850.5 10851.0 10845.5 10844.0 10845.0 10844.0 10834.0 10832.5 10833.5 10833.0 10821.0 10818.5 10820.5 10820.5 10817.5 10815.0 10812.0 10810.5 10810.0 10809.5 10807.0 10805.5 10798.5 10796.0 10794.5 10792.5 10777.5 10774.5 10767.5 10765.5 10763.0 10761 . 0 10756.0 10752.5 10743.5 10743.0 10738.5 10733.0 10719.0 10715.0 10708.5 10705.5 10707.0 10705.5 10702.0 10700.5 10686.0 10683.0 10684.0 10684.0 10669.0 10665.0 10656.5 10653 . 5 10651 . 5 10649.5 10648.5 10646.0 10646.0 10645.5 10641 . 0 10640.5 10621 . 5 10621 . 5 10617.5 10614.5 10606.5 10604.5 10600.5 10598.0 10596.5 10596.5 10594.5 10594.0 10591 . 5 10591 . 5 10582.0 10579.5 10580.0 10580.5 10578.0 10576.5 10576.5 10573.5 10575.0 10573.5 10568.0 10564.5 10565.5 10564.5 10547.5 10546.0 10544.0 10541.5 10528.0 10527.0 10506.5 10505.0 10506.0 10505.0 10498.5 10497.0 10498.0 10496.0 10488.5 10486.5 10478.5 10477.5 10476.5 10474.5 LIS Tape Verification Listing Schlumberger Alaska Computing Center 18-FEB-1997 12:03 PAGE: 10 10460.5 10460.0 10449.0 10445.5 10438.5 10424.0 10420.5 10418.0 10415.5 10415.0 10410.5 10410.0 10407.0 10406.5 10398.5 10390.5 10390.0 10388.0 10386.0 10382 0 10379 0 10374 0 10373 5 10366 5 10360 0 10346 5 10345.5 10342.5 10341.5 10330.0 10328.5 10327.5 10325.0 10324.0 10317.0 10315.0 10304.0 10303.5 10295.0 10292.5 10276.5 10275.0 10271.5 10270 5 10255 5 10253 5 10252 0 10248 5 10247 5 10244.5 10239.0 10238.5 10232.0 10231.5 10226.5 10458.5 10444.0 10437.0 10423.0 10416.0 10413.5 10408.5 10405.5 10388.5 10384.5 10380.5 10372.0 10358.5 10344.5 10340.0 10328.5 10326.5 10323.5 10316.0 10303.0 10291.0 10273.5 10269.5 10251.5 10250.0 10247. 0 10245.5 10243. 0 10237.0 10230.5 10225.5 10459.0 10448.0 10437.0 10418.0 10413.5 10409.0 10406.0 10397.0 10388.5 10386.0 10377.5 10372. 0 10364. 0 10358.5 10344.5 10340.5 10326.5 10323. 0 10312.5 10300.0 10291. 0 10274.5 10269. 0 10253.0 10237. 0 10230.5 LIS Tape Verification Listing Schlumberger Alaska Computing Center 18-FEB-1997 12:03 PAGE: 11 10225.5 10225.0 10219.0 10217.0 10216.5 10215.5 10211.5 10205.0 10204.5 10202.0 10197.0 10194.5 10192.0 10191 0 10183 0 10179 0 10173 5 10167 5 10165 5 10161 5 10158 0 10153 0 10151 5 10142 0 10140 5 10138 5 10136 5 10135 5 10128 5 10124 0 10115 5 10114.5 10109.0 10099.0 10096.0 10094.5 10091.5 10089.0 10087.0 10080.5 10079.5 10075.5 10070.0 10069.5 10060.0 10058.0 10056.0 10054.5 10052.5 10051.5 100.0 $ REMARKS: 10223.5 10217.0 10215.0 10214.0 10210.0 10204.0 10201.0 10196.0 10193.0 10190.0 10178.0 10172.5 10164.5 10160.5 10150.0 10140.5 10137.5 10134.0 10131.0 10125.0 10114.5 10109.0 10099.0 10094.5 10092.0 10089.5 10080.5 10076.0 10070.0 10060.0 10056.0 10052.0 100.5 10223.0 10214.5 10202.5 10190.0 10180.5 10166.5 10156.5 10151.0 10138.5 10134.0 10113.0 10094.0 10085.0 10077.0 10067.5 10057.5 10054.0 10050.5 98.0 THIS FILE CONTAINS CNTD PASS #2. THE DEPTH SHIFTS SHOWN ABOVE REFLECT GRCH PASS #2 TO GRCH PASS #1; AND LIS Tape Verification Listing Schlumberger Alaska Computing Center 18-FEB-1997 12:03 PAGE: 12 NPHI PASS #2 TO NPHI PASS #1. ALL OTHER CNTD CURVES WERE CARRIED WITH THE NPHI SHIFT. $ LIS FORMAT DATA ** DATA FORMAT SPECIFICATION RECORD ** ** SET TYPE- 64EB ** TYPE REPR CODE VALUE 1 66 0 2 66 0 3 73 44 4 66 1 5 66 6 73 7 65 8 68 0.5 9 65 FT 11 66 23 12 68 13 66 0 14 65 FT 15 66 68 16 66 1 0 66 1 ** SET TYPE - CHAN ** NAME SERV UNIT SERVICE API API API API FILE NUMB NUMB SIZE REPR PROCESS ID ORDER # LOG TYPE CLASS MOD NUMB SAMP ELEM CODE (HEX) DEPT FT 505978 O0 000 O0 0 2 1 1 4 68 0000000000 NPHI CNTD PU-S 505978 O0 000 O0 0 2 1 1 4 68 0000000000 N-RAT CNTD 505978 O0 000 O0 0 2 1 1 4 68 0000000000 CRAT CNTD 505978 O0 000 O0 0 2 1 1 4 68 0000000000 NCNT CNTD CPS 505978 O0 000 O0 0 2 1 1 4 68 0000000000 FCNT CNTD CPS 505978 O0 000 O0 0 2 1 1 4 68 0000000000 CFTC CNTD CPS 505978 O0 000 O0 0 2 1 1 4 68 0000000000 CNTC CNTD CPS 505978 O0 000 O0 0 2 1 1 4 68 0000000000 GRCH CNTD GAPI 505978 O0 000 O0 0 2 1 1 4 68 0000000000 TENS CNTD LB 505978 O0 000 O0 0 2 1 1 4 68 0000000000 CCL CNTD V 505978 O0 000 O0 0 2 1 1 4 68 0000000000 ** DATA ** LIS Tape Verification Listing Schlumberger Alaska Computing Center 18-FEB-1997 12:03 PAGE: 13 DEPT. 11328. 500 NPHI. CNTD 21. 968 NRAT. CNTD 4. 120 NCNT. CNTD 5275. 045 FCNT. CNTD 1156. 794 CFTC. CNTD 1174 . 048 GRCH. CNTD - 999.250 TENS. CNTD - 70. 000 CCL. CNTD O. 000 DEPT. 10048.000 NPHI.CNTD NCNT. CNTD 1770.992 FCNT. CNTD GRCH. CNTD -999.250 TENS. CNTD 53.886 NRAT. CNTD 225.141 CFTC. CNTD -65.000 CCL.CNTD 8.267 234. 080 O. 000 CRA T . CNTD CNTC. CNTD CRA T . CNTD CNTC. CNTD 4. 017 5190. 280 7. 769 1871. 458 ** END OF DATA ** **** FILE TRAILER **** FILE NAME : EDIT .002 SERVICE · FLIC VERSION · O01CO1 DATE · 97/02/18 MAX REC SIZE : 1024 FILE TYPE : LO LAST FILE : **** FILE HEADER **** FILE NAME : EDIT .003 SERVICE . FLIC VERSION : O01CO1 DATE · 97/02/18 MAX REC SIZE : 1024 FILE TYPE : LO LAST FILE : FILE HEADER FILE NUMBER: 3 EDITED CURVES Depth shifted and clipped curves for each pass in separate files. PASS NUMBER: 3 DEPTH INCREMENT: O . 5000 FILE SU~ff4ARY LDWG TOOL CODE START DEPTH STOP DEPTH GRCH 11289.0 10050.0 CN~D 11314.0 10050.0 $ CURVE SHIFT DATA - PASS TO PASS (MEASURED DEPTH) BASELINE CURVE FOR SHIFTS LDWC CURVE CODE: GRCH PASS NUMBER: 1 LIS Tape Verification Listing Schlumberger Alaska Computing Center 18-FEB-1997 12:03 PAGE: 14 BASELINE DEPTH 88888.0 11299.0 11293.5 11287.5 11281.5 11281.0 11262.0 11254.0 11252.5 11251.0 11238.5 11223.5 11220.5 11212.0 11198.5 11183.5 11180.0 11173.0 11168.5 11165.5 11163.0 11151.5 11150.0 11133.0 11132.0 11126.0 11123.0 11117.5 11112 5 11111 0 11107 5 11100 5 11094 0 11087 0 11085.0 11079.0 11072.5 11067.0 11063.5 11052.5 11051.0 11034.0 11030.5 11022.5 11012.5 11003.5 11002.0 10991.0 10981.0 10972.0 10971.0 10933.5 .......... EQUIVALENT UNSHIFTED DEPTH .......... GRCH CNTD 88889.0 88886.0 11282.0 11251.5 11249.0 11237.0 11221.0 11198.0 11179.5 11168.5 11165.0 11148.0 11131.5 11124.0 11116.5 11110.0 11105.5 11098.5 11087.0 11083.5 11070.5 11063.5 11050.0 11033.0 11030.0 11023.0 11001.5 10988.0 10979.0 10969.5 11297.0 11290.5 11284.5 11277.5 11259.5 11250.0 11221.5 11210.0 11180.5 11169.5 11159.5 11148.5 11132.0 11124.0 11110.0 11092.0 11076.0 11065.0 11049.5 11010.5 11002. 0 10970.0 10931.0 LIS Tape Verification Listing Schlumberger Alaska Computing Center 18-FEB-1997 12:03 PAGE: 15 10931.5 10904.0 10902.5 10895.0 10889.0 10874.5 10855.5 10851.5 10846.0 10845.5 10836.0 10824.5 10821.5 10820.0 10817.0 10815.5 10811.5 10809.5 10808.0 10803.0 10796.0 10788 5 10777 5 10766 0 10765 5 10762 0 10750 0 10748 0 10740 0 10738 5 10724 5 10719.0 10718.5 10708.5 10707.0 10702.0 10696.0 10695.5 10690.0 10687.0 10683.5 10670.5 10667.5 10663.5 10652.0 10648.0 10645.5 10639.0 10627 5 10620 0 10619 0 10608 0 10606 5 106010 10589.5 10930.0 10903.0 10887.5 10851.5 10843.5 10833.5 10820.5 10817.5 10815.5 10813.5 10810.0 10801.5 10787.0 10765.5 10761.0 10749.5 10739.0 10724.0 10716.0 10705.5 10700.5 10695.5 10692.5 10685.5 10666.5 10649.5 10644.0 10639.0 10627.5 10621.5 10605.0 10599.0 10903.5 10892.5 10873.0 10854.0 10844.0 10822.0 10819.0 10810.5 10806.5 10793.5 10774.5 10763.0 10742.5 10733.0 10715.0 10705.5 10693.0 10684.0 10666.5 10660.0 10645.5 10616.0 10605. 0 10587.0 LIS Tape Verification Listing Schlumberger Alaska Computing Center 18-FEB-1997 12:03 PAGE: 16 10582.0 10581.0 10576.5 10574.5 10564.0 10551.0 10547.0 10539.5 10528.0 10527.0 10519.0 10514.0 10501.5 10499.0 10488.5 10479.0 10476 5 10463 5 10461 0 10460 0 10449 0 10448 5 10438 5 10438 0 10430 0 10420 5 10415 5 10415 0 10410 5 10410 0 10407 0 10394 0 10390 0 10388 5 10386 0 10381 5 10379 5 10374 5 10373 5 10363 5 10360 0 10359 5 10349 5 10346 5 10342 0 10341 5 10328 5 10327 5 10325 0 10315 0 10305 5 10295.0 10292.5 10282.0 10277.0 10580.5 10574.0 10564.0 10553.0 10530.0 10516.5 10503.0 10480.5 10463.0 10458.5 10447.5 10437.0 10429.5 10413.5 10408.5 10405.5 10392.5 10389.0 10384.5 10380.0 10372.0 10358.5 10344.5 10340.0 10326.5 10313.5 10291.0 10275.5 10579.0 10573.5 10545.5 10538.0 10527.5 10517.0 10497.5 10486.5 10474.5 10459.5 10447.5 10436.0 10418.0 10413.5 10409.0 10406.0 10388.5 10386.5 10378.0 10372.5 10362.0 10358.5 10347.5 10344.5 10340.5 10326.5 10323.0 10302.0 10291.0 10280.0 10274.5 LIS Tape Verification Listing Schlumberger Alaska Computing Center 18-FEB-1997 12:03 PAGE: 17 10271.5 10256.0 10255.5 10253.0 10251.5 10244.5 10239.0 10238.5 10232.0 10231.5 10226.5 10223.5 10215.5 10206.5 10203.5 10194.5 10192.5 10191.0 10186.5 10183.0 10180.5 10179.0 10176.5 10173.5 10167.5 10166.0 10160.5 10158.0 10153.0 10152.0 10143.0 10142.0 10136.5 10135.5 10129.5 10116.0 10114.0 10099.5 10096.0 10094.5 10093.5 10091 5 10081 5 10075 5 10069 5 10067 5 10065 0 10062 5 10060 0 10054 5 10053 5 10051 5 100 0 $ 10270.0 10253.0 10251.5 10250.0 10243.0 10237.0 10230.5 10225.0 10214.0 10205.5 10202.0 10193.0 10190.0 10184.5 10178.0 10172.5 10165.0 10158.5 10151.0 10140.5 10134.0 10129.5 10114.5 10099.0 10094.5 10092.0 10081.5 10067.5 10062.5 10055.5 10052.0 100.5 10269.0 10253.0 10237.0 10230.5 10221.0 10204.0 10190.5 10180.5 10178.5 10174.5 10166.0 10156.5 10151.0 10141.0 10134.0 10113.0 10094.0 10091.0 10073.0 10068.0 10060.5 10057.5 10051.0 97.5 LIS Tape Verification Listing Schlumberger Alaska Computing Center 18-FEB-1997 12:03 PAGE: 18 REMARKS: THIS FILE CONTAINS CNTD PASS #3. THE DEPTH SHIFTS SHOWN ABOVE REFLECT GRCH PASS #3 TO GRCH PASS #1; AND NPHI PASS #3 TO NPHI PASS #1. ALL OTHER CNTD CURVES WERE CARRIED WITH THE NPHI SHIFT. $ LIS FORMAT DATA ** DATA FORMAT SPECIFICATION RECORD ** ** SET TYPE - 64EB ** TYPE REPR CODE VALUE 1 66 0 2 66 0 3 73 44 4 66 1 5 66 6 73 7 65 8 68 0.5 9 65 FT 11 66 23 12 68 13 66 0 14 65 FT 15 66 68 16 66 1 0 66 1 ** SET TYPE - CHAN ** NAME SERV UNIT SERVICE API API API API FILE NUMB NUMB SIZE REPR PROCESS ID ORDER # LOG TYPE CLASS MOD NUMB SAMP ELEM CODE (HEX) DEPT FT 505978 O0 000 O0 0 3 1 1 4 68 0000000000 NPHI CNTD PU-S 505978 O0 000 O0 0 3 1 1 4 68 0000000000 NRAT CNTD 505978 O0 000 O0 0 3 1 1 4 68 0000000000 CRAT CNTD 505978 O0 000 O0 0 3 1 1 4 68 0000000000 NCNT CNTD CPS 505978 O0 000 O0 0 3 1 1 4 68 0000000000 FCNT CNTD CPS 505978 O0 000 O0 0 3 1 1 4 68 0000000000 CFTC CNTD CPS 505978 O0 000 O0 0 3 1 1 4 68 0000000000 CNTC CNTD CPS 505978 O0 000 O0 0 3 1 1 4 68 0000000000 GRCH CNTD GAPI 505978 O0 000 O0 0 3 1 1 4 68 0000000000 TENS CNTD LB 505978 O0 000 O0 0 3 1 1 4 68 0000000000 CCL CNTD V 505978 O0 000 O0 0 3 1 1 4 68 0000000000 LIS Tape Verification Listing Schlumberger Alaska Computing Center 18-FEB-1997 12:03 PAGE: 19 ** DATA ** DEPT. 11312.000 NPHI.CNTD 19.883 NRAT. CNTD 3.674 NCNT. CNTD 5395.659 FCNT. CNTD 1510.981 CFTC. CNTD 1471.004 GRCH. CNTD -999.250 TENS. CNTD -65.000 CCL.CNTD 0.000 DEPT. 10047.500 NPHI. CNTD NCNT. CNTD 1862.595 FCNT. CNTD GRCH. CNTD -999.250 TENS.CNTD 57.232 NRAT. CNTD 244.275 CFTC. CNTD -65.000 CCL.CNTD 7.750 231.507 0.000 CRAT. CNTD CNTC. CNTD CRA T. CNTD CNTC. CNTD 3. 737 5672. 362 8.153 1912.897 ** END OF DATA ** **** FILE TRAILER **** FILE NAME : EDIT .003 SERVICE : FLIC VERSION : O01CO1 DATE : 97/02/18 MAX REC SIZE : 1024 FILE TYPE : LO LAST FILE : **** FILE HEADER **** FILE NAME : EDIT .004 SERVICE ' FLIC VERSION ' O01CO1 DATE ' 97/02/18 MAX REC SIZE : 1024 FILE TYPE : LO LAST FILE : FILE HEADER FILENUMBER: 4 AVERAGED CURVES Compensated Neutron: Arithmetic average of edited passes for all curves. DEPTH INCREMENT 0.5000 PASSES INCLUDED IN AVERAGE LDWG TOOL CODE PASS NUMBERS 1, 2, 3, REMARKS: THE ARITHMETIC AVERAGE WAS CALCULATED AFTER CLIPPING AND DEPTHCORRECTIONS WERE APPLIED. $ LIS FORMAT DATA LIS Tape Verification Listing Schlumberger Alaska Computing Center 18-FEB-1997 12:03 PAGE: 2O ** DATA FORMAT SPECIFICATION RECORD ** ** SET TYPE - 64EB ** TYPE REPR CODE VALUE 1 66 0 2 66 0 3 73 40 4 66 1 5 66 6 73 7 65 8 68 0.5 9 65 FT 11 66 25 12 68 13 66 0 14 65 FT 15 66 68 16 66 1 0 66 1 ** SET TYPE - CHAN ** NAME SERV UNIT SERVICE API API API API FILE NUMB NUMB SIZE REPR PROCESS ID ORDER # LOG TYPE CLASS MOD NUMB SAMP ELEM CODE (HEX) DEPT FT 505978 O0 000 O0 0 4 1 1 4 68 0000000000 NPHI CNAV PU-S 505978 O0 000 O0 0 4 1 1 4 68 0000000000 NRAT CNAV 505978 O0 000 O0 0 4 1 1 4 68 0000000000 CRAT CNAV 505978 O0 000 O0 0 4 1 1 4 68 0000000000 NCNT CNAV CPS 505978 O0 000 O0 0 4 1 1 4 68 0000000000 FCNT CNAV CPS 505978 O0 000 O0 0 4 1 1 4 68 0000000000 CFTC CNAV CPS 505978 O0 000 O0 0 4 1 1 4 68 0000000000 CNTC CNAV CPS 505978 O0 000 O0 0 4 1 1 4 68 0000000000 GRCH CNTD GAPI 505978 O0 000 O0 0 4 1 1 4 68 0000000000 TENS CNTD LB 505978 O0 000 O0 0 4 1 1 4 68 0000000000 ** DATA ** DEPT. 11329.500 NPHI. CNAV -999.250 NRAT. CNAV -999.250 CRAT. CNAV NCNT. CNAV -999.250 FCNT. CNAV -999.250 CFTC. CNAV -999.250 CNTC.CNAV GRCH. CNTD -999.250 TENS. CNTD -65.000 DEPT. 10048.500 NPHI. CNAV 60.646 NRAT. CNAV 8.430 CRAT. CNAV NCNT. CNAV 1877.153 FCNT. CNAV 222.383 CFTC. CNAV 214.003 CNTC. CNAV GRCH. CNTD -999.250 TENS. CNTD -65.000 -999.250 -999.250 8.543 1903.712 LIS Tape Verification Listing Schlumberger Alaska Computing Center 18-FEB-1997 12:03 PAGE: 21 ** END OF DATA ** **** FILE TRAILER **** FILE NAME : EDIT .004 SERVICE : FLIC VERSION . O01CO1 DATE : 97/02/18 MAX REC SIZE : 1024 FILE TYPE : LO LAST FILE : **** FILE HEADER **** FILE NAME : EDIT .005 SERVICE : FLIC VERSION · O01CO1 DATE : 97/02/18 ~REC SIZE : 1024 FILE TYPE : LO LAST FILE : FILE HEADER FILE ArO?4~ER 5 RAW CURVES Curves and log header data for each pass in separate files; raw background pass in last file PASS NUMBER: 1 DEPTH INCREMENT: 0.5000 FILE SUMMARY VENDOR TOOL CODE START DEPTH STOP DEPTH 11332.0 10050.0 CNTD LOG HEADER DATA DATE LOGGED: 4-FEB-97 SOFTWARE VERSION: CP 42.2 TIME LOGGER ON BOTTOM: 1504 04-FEB-97 TD DRILLER (FT) : 11370. 0 TD LOGGER (FT) : 11335.0 TOP LOG INTERVAL (FT) : 10050.0 BOTTOM LOG INTERVAL (FT) : 11332.0 LOGGING SPEED (FPHR): 1800.0 DEPTH CONTROL USED (YES/NO) : NO TOOL STRING (TOP TO BOTTOM) VENDOR TOOL CODE TOOL TYPE ......................... TOOL NUMBER LIS Tape Verification Listing Schlumberger Alaska Computing Center 18-FEB-1997 12:03 PAGE: 22 GR GAMMA RAY CNTD COMP. NEUTRON $ BOREHOLE AND CASING DATA OPEN HOLE BIT SIZE (IN): DRILLERS CASING DEPTH (FT) : LOGGERS CASING DEPTH (FT) : BOREHOLE CONDITIONS FLUID TYPE: FLUID DENSITY (LB/G): SURFACE TEMPERATURE (DEGF) : BOTTOM HOLE TEMPERATURE (DEGF) : FLUID SALINITY (PPM) : FLUID LEVEL (FT) : FLUID RATE AT WELLHEAD (BPM) : WATER CUTS (PCT) : GAS~OIL RATIO '. CHOKE (DEG) : CGRS-A 795 CNT-D 146 11415.0 2 %KCL NEUTRON TOOL TOOL TYPE (EPITHERMAL OR THERMAL): MATRIX: MATRIX DENSITY: HOLE CORRECTION (IN): THERMAL SANDSTONE 2.65 BLUELINE COUNT RATE NORMALIZATION IN OIL ZONE TOP NORMALIZING WINDOW (FT): BASE NORMALIZING WINDOW (FT): BLUELINE COUNT RATE SCALES SET BY FIELD ENGINEER FAR COUNT RATE LOW SCALE (CPS): 0 FAR COUNT RATE HIGH SCALE (CPS) : 4000 NEAR COUNT RATE LOW SCALE (CPS): 0 NEAR COUNT RATE HIGH SCALE (CPS): 20000 TOOL STANDOFF (IN): REMARKS: CORRELATED TO ATLAS ACOUSTILOG DATED il-JUN-96, MAIN PASS. LOGGED WITH SANDSTONEMATRIX. GOC 10698'. THIS FILE CONTAINS THE RAW CNTD DATA FOR PASS #1. $ LIS FORMAT DATA LIS Tape Verification Listing Schlumberger Alaska Computing Center 18-FEB-1997 12:03 PAGE: 23 ** DATA FORMAT SPECIFICATION RECORD ** ** SET TYPE - 64EB ** TYPE REPR CODE VALUE 1 66 0 2 66 0 3 73 44 4 66 1 5 66 6 73 7 65 8 68 0.5 9 65 FT 11 66 23 12 68 13 66 0 14 65 FT 15 66 68 16 66 1 0 66 1 ** SET TYPE - CHAN ** NAME SERV UNIT SERVICE API API API API FILE NUMB NUMB SIZE REPR PROCESS ID ORDER # LOC TYPE CLASS MOD NUMB SAMP ELEM CODE (HEX) DEPT FT 505978 O0 000 O0 0 5 1 1 4 68 0000000000 NPHI PS1 PU 505978 O0 000 O0 0 5 1 1 4 68 0000000000 RTNR PS1 505978 O0 000 O0 0 5 1 1 4 68 0000000000 TNRA PS1 505978 O0 000 O0 0 5 1 1 4 68 0000000000 RCNT PS1 CPS 505978 O0 000 O0 0 5 1 1 4 68 0000000000 RCFT PS1 CPS 505978 O0 000 O0 0 5 1 1 4 68 0000000000 CNTC PS1 CPS 505978 O0 000 O0 0 5 1 1 4 68 0000000000 CFTC PS1 CPS 505978 O0 000 O0 0 5 1 1 4 68 0000000000 GR PS1 GAPI 505978 O0 000 O0 0 5 1 1 4 68 0000000000 TENS PS1 LB 505978 O0 000 O0 0 5 1 1 4 68 0000000000 CCL PS1 V 505978 O0 000 O0 0 5 1 1 4 68 0000000000 ** DATA ** DEPT. 11340.500 NPHI.PS1 17.225 RTNR.PS1 3,355 TNRA.PS1 RCNT. PS1 4078.432 RCFT. PS1 1215.686 CNTC. PS1 4189,497 CFTC. PSI GR.PS1 15,898 TENS.PSi -65.000 CCL.PS1 0,026 DEPT. 10049.000 NPHI.PS1 62.086 RTNR.PS1 8,500 TNRA.PS1 RCNT. PS1 1711.790 RCFT. PS1 209,607 CNTC. PS1 1807,993 CFTC.PSi GR.PSl 17.266 TENS.PSI -65.000 CCL.PS1 0,000 3.379 1195.549 8.709 201.791 LIS Tape Verification Listing Schlumberger Alaska Computing Center 18-FEB-1997 12:03 PAGE: 24 ** END OF DATA ** **** FILE TRAILER **** FILE NAME : EDIT .005 SERVICE : FLIC VERSION : O01CO1 DATE : 97/02/18 MAX REC SIZE : 1024 FILE TYPE : LO LAST FILE : **** FILE H~ER **** FILE NAME : EDIT .006 SERVICE . FLIC VERSION · O01CO1 DATE · 97/02/18 MAX REC SIZE : 1024 FILE TYPE : LO LAST FILE : FILE HEADER FILE i~J~BER 6 RAW CURVES Curves and log header data for each pass in separate files; raw background pass in last file PASS 1 V-UMbER: 2 DEPTH INCREMENT: 0.5000 FILE S~Y VENDOR TOOL CODE START DEPTH STOP DEPTH 11332.0 10050.0 CNTD LOG HEADER DATA DATE LOGGED: 4-FEB-97 SOFTWARE VERSION: CP 42.2 TIME LOGGER ON BOTTOM: 1504 04-FEB-97 TD DRILLER (FT): 11370. 0 TD LOGGER (FT) : 11335.0 TOP LOG INTERVAL (FT) : 10050.0 BOTTOM LOG INTERVAL (FT) : 11332.0 LOGGING SPEED (FPHR) : 1800.0 DEPTH CONTROL USED (YES/NO): NO TOOL STRING (TOP TO BOTTOM) VENDOR TOOL CODE TOOL TYPE TOOL NUMBER LIS Tape Verification Listing Schlumberger Alaska Computing Center 18-FEB-1997 12:03 PAGE: 25 GR GAMMA RAY CNTD COMP. NEUTRON $ CGRS-A 795 CNT-D 146 BOREHOLE AND CASING DATA OPEN HOLE BIT SIZE (IN): DRILLERS CASING DEPTH (FT): LOGGERS CASING DEPTH (FT) : 11415.0 BOREHOLE CONDITIONS FLUID TYPE: FLUID DENSITY (LB/G): SURFACE TEMPERATURE (DEGF) : BOTTOM HOLE TEMPERATURE (DEGF) : FLUID SALINITY (PPM) : FLUID LEVEL (FT) : FLUID RATE AT WELLHEAD (BPM): WATER CUTS (PCT) : GAS~OIL RATIO: CHOKE (DEG) : 2 ¢KCL NEUTRON TOOL TOOL TYPE (EPITHERMAL OR THERMAL): MA TRIX: MATRIX DENSITY: HOLE CORRECTION (IN): THERMAL SANDSTONE 2.65 BLUELINE COUNT RATE NORMALIZATION IN OIL ZONE TOP NORMALIZING WINDOW (FT) : BASE NORMALIZING WINDOW (FT) : BLUELINE COUNT RATE SCALES SET BY FIELD ENGINEER FAR COUNT RATE LOW SCALE (CPS): 0 FAR COUNT RATE HIGH SCALE (CPS): 4000 NEAR COUNT RATE LOW SCALE (CPS): 0 NEAR COUNT RATE HIGH SCALE (CPS): 20000 TOOL STANDOFF (IN): REMARKS: CORRELATED TO ATLAS ACOUSTILOG DATED Il-JUN-96, MAIN PASS. LOGGED WITH SANDSTONE MATRIX. GOC 10698'. THIS FILE CONTAINS THE RAW CNTD DATA FOR PASS #2. $ LIS FORMAT DATA LIS Tape Verification Listing Schlumberger Alaska Computing Center 18-FEB-1997 12:03 PAGE: 26 * * DATA FORMAT SPECIFICATION RECORD * * ** SET TYPE - 64EB ** TYPE REPR CODE VALUE 1 66 0 2 66 0 3 73 44 4 66 1 5 66 6 73 7 65 8 68 0.5 9 65 FT 11 66 23 12 68 13 66 0 14 65 FT 15 66 68 16 66 1 0 66 1 ** SET TYPE - CHAN ** NAME SERV UNIT SERVICE API API API API FILE NUMB NUMB SIZE REPR PROCESS ID ORDER # LOG TYPE CLASS MOD NUMB SAMP ELEM CODE (HEX) O0 000 O0 0 6 1 1 4 68 0000000000 DEPT FT 505978 NPHI PS2 PU 505978 O0 000 O0 0 6 1 1 4 68 0000000000 RTNR PS2 505978 O0 000 O0 0 6 1 1 4 68 0000000000 TNRA PS2 505978 O0 000 O0 0 6 1 1 4 68 0000000000 RCNT PS2 CPS 505978 O0 000 O0 0 6 1 1 4 68 0000000000 RCFT PS2 CPS 505978 O0 000 O0 0 6 1 1 4 68 0000000000 CNTC PS2 CPS 505978 O0 000 O0 0 6 1 1 4 68 0000000000 CFTC PS2 CPS 505978 O0 000 O0 0 6 1 1 4 68 0000000000 GR PS2 GAPI 505978 O0 000 O0 0 6 1 1 4 68 0000000000 TENS PS2 LB 505978 O0 000 O0 0 6 1 1 4 68 0000000000 CCL PS2 V 505978 O0 000 O0 0 6 1 1 4 68 0000000000 ** DATA ** DEPT. 11342.000 NPHI.PS2 31.988 RTNR,PS2 5.245 TNRA.PS2 RCNT. PS2 5232.940 RCFT. PS2 997.647 CNTC, PS2 5375.446 CFTC. PS2 GR.PS2 18.938 TENS.PS2 -65.000 CCL.PS2 0.026 5.283 981,121 ** END OF DATA ** LIS Tape Verification Listing Schlumberger Alaska Computing Center 18-FEB-1997 12:03 PAGE: 27 **** FILE TRAILER **** FILE NAME : EDIT .006 SERVICE · FLIC VERSION · O01CO1 DATE : 97/02/18 MAX REC SIZE : 1024 FILE TYPE : LO LAST FILE : **** FILE H~ER **** FILE NAME : EDIT .007 SERVICE : FLIC VERSION : O01CO1 DATE : 97/02/18 MAX REC SIZE : 1024 FILE TYPE : LO LAST FILE : FILE HEADER FILE NUMBER 7 RAW CURVES Curves and log header data for each pass in separate files; raw background pass in last file PASS NUMBER: 3 DEPTH INCREMENT: 0.5000 FILE SU~2~ARY VENDOR TOOL CODE START DEPTH STOP DEPTH 11332.0 10050.0 CNTD LOG HEADER DATA DATE LOGGED: 4-FEB-97 SOFTWARE VERSION: CP 42.2 TIME LOGGER ON BOTTOM: 1504 04-FEB-97 TD DRILLER (FT) '. 11370.0 TD LOGGER (FT) : 11335.0 TOP LOG INTERVAL (FT) : 10050.0 BOTTOM LOG INTERVAL (FT) : 11332.0 LOGGING SPEED (FPHR): 1800.0 DEPTH CONTROL USED (YES/NO): NO TOOL STRING (TOP TO BOTTOM) VENDOR TOOL CODE TOOL TYPE GR G~ RAY CNTD COMP. NEUTRON $ BOREHOLE AND CASING DATA OPEN HOLE BIT SIZE (IN): TOOL NUMBER ........... CGRS-A 795 CNT-D 146 LIS Tape Verification Listing Schlumberger Alaska Computing Center 18-FEB-1997 12:03 PAGE: 28 DRILLERS CASING DEPTH (FT) : LOGGERS CASING DEPTH (FT) : 11415.0 BOREHOLE CONDITIONS FLUID TYPE: FLUID DENSITY (LB/G): SURFACE TEMPERATURE (DEGF) : BOTTOM HOLE TEMPERATURE (DEGF) : FLUID SALINITY (PPM) : FLUID LEVEL (FT) : FLUID RATE AT WELLHEAD (BPM) : WATER CUTS (PCT) : GAS~OIL RATIO: CHOKE (DEG) : 2 %KCL NEUTRON TOOL TOOL TYPE (EPITHERMAL OR THERMAL) : MATRIX: MATRIX DENSITY: HOLE CORRECTION (IN): THERMAL SANDSTONE 2.65 BLUELINE COUNT RATE NORMALIZATION IN OIL ZONE TOP NORMALIZING WINDOW (FT) : BASE NORMALIZING WINDOW (FT) : BLUELINE COUNT RATE SCALES SET BY FIELD ENGINEER FAR COUNT RATE LOW SCALE (CPS) : 0 FAR COUNT RATE HIGH SCALE (CPS) : 4000 NEAR COUNT RATE LOW SCALE (CPS): 0 NEAR COUNT RATE HIGH SCALE (CPS): 20000 TOOL STANDOFF (IN): REMARKS: CORRELATED TO ATLAS ACOUSTILOG DATED il-JUN-96, MAIN PASS. LOGGED WITH SANDSTONE MATRIX. GOC 10698'. THIS FILE CONTAINS THE RAW CNTD DATA FOR PASS #3. $ LIS FORMAT DATA ** DATA FORMAT SPECIFICATION RECORD ** ** SET TYPE - 64EB ** TYPE REPR CODE VALUE 1 66 0 2 66 0 3 73 44 4 66 1 5 66 6 73 LIS Tape Verification Listing Schlumberger Alaska Computing Center 18-FEB-1997 12:03 PAGE: 29 TYPE REPR CODE VALUE 7 65 8 68 0.5 9 65 FT 11 66 23 12 68 13 66 0 14 65 FT 15 66 68 16 66 1 0 66 1 ** SET TYPE - CHAN ** NA2~E SERV UNIT SERVICE API API API API FILE NUMB NUMB SIZE REPR PROCESS ID ORDER # LOG TYPE CLASS MOD NUMB SAMP ELEM CODE (HEX) DEPT FT 505978 O0 000 O0 0 7 1 1 4 68 0000000000 NPHI PS3 PU 505978 O0 000 O0 0 7 1 1 4 68 0000000000 RTNR PS3 505978 O0 000 O0 0 7 1 1 4 68 0000000000 TNN~ PS3 505978 O0 000 O0 0 7 1 1 4 68 0000000000 RCNT PS3 CPS 505978 O0 000 O0 0 7 1 1 4 68 0000000000 RCFT PS3 CPS 505978 O0 000 O0 0 7 1 1 4 68 0000000000 CNTC PS3 CPS 505978 O0 000 O0 0 7 1 1 4 68 0000000000 CFTC PS3 CPS 505978 O0 000 O0 0 7 1 1 4 68 0000000000 GR PS3 GAPI 505978 O0 000 O0 0 7 1 1 4 68 0000000000 TENS PS3 LB 505978 O0 000 O0 0 7 1 1 4 68 0000000000 CCL PS3 V 505978 O0 000 O0 0 7 1 1 4 68 0000000000 ** DATA ** DEPT. 11324.000 NPHI.PS3 20.885 RTNR.PS3 3.844 TNRA.PS3 RCNT. PS3 5803.922 RCFT. PS3 1509.804 CNTC.PS3 5961.977 CFTC. PS3 GR.PS3 25.219 TENS.PS3 -65.000 CCL.PS3 0.030 DEPT. 10047.000 NPHI.PS3 63.004 RTNR.PS3 8.000 TNRA.PS3 RCNT. PS3 1925.049 RCFT. PS3 232.558 CNTC.PS3 1944.233 CFTC. PS3 GR.PS3 20.922 TENS.PS3 -60.000 CCL.PS3 0.000 3.872 1484.794 8.814 213.837 ** END OF DATA ** LIS Tape Verification Listing Schlumberger Alaska Computing Center 18-FEB-1997 12:03 PAGE: 3O **** FILE TRAILER **** FILE NAME : EDIT .007 SERVICE · FLIC VERSION . O01CO1 DATE . 97/02/18 MAX REC SIZE : 1024 FILE TYPE : LO LAST FILE : **** TAPE TRAILER **** SERVICE NAME : EDIT DATE : 97/02/18 ORIGIN · FLIC TAPE NAME : 97075 CONTINUATION # : 1 PREVIOUS TAPE : CO~4ENT ' BP EXPLORATION, PRUDHOE BAY, B-27A, API #50-029-21471-01 **** REEL TRAILER **** SERVICE NAME : EDIT DATE · 97/02/18 ORIGIN . FLIC REEL NAME : 97075 CONTINUATION # : PREVIOUS REEL : COf4~IENT : BP EXPLORATION, PRUDHOE BAY, B-27A, API #50-029-21471-01 · £ape Subfile ~. is type: L.o TAPE HEADER PRUDHOE BAY UNIT OPEN HOLE WIRELINE LOGS WELL NAME: API NIIMBER: OPERATOR: LOGGING COMPANY: TAPE CREATION DATE: JOB DATA JOB NUMBER: LOGGING ENGINEER: OPERATOR WITNESS: SURFACE LOCATION SECTION: TOWNSHIP: RANGE: FNL: FSL: FEL: FWL: ELEVATION(FT FROM MSL 0) KELLY BUSHING: DERRICK FLOOR: GROUND LEVEL: WELL CASING RECORD RUN 1 6699.00 R. ECK B. DAWSON B-27A 500292147101 BP EXPLORATION (ALASKA) INC. WESTERN ATLAS LOGGING SERVICES 13-JUN-96 RUN 2 RUN 3 31 liN 14E 496 1595 75.40 73.90 45.67 OPEN HOLE CASING DRILLERS BIT SIZE (IN) SIZE (IN) DEPTH (FT) 1ST STRING 2ND STRING 3RD STRING 7.000 10115.0 PRODUCTION STRING 6.000 11415.0 REMARKS: DLL/MLL/DAC/CN/GR. CIRCULATION STOPPED AT 0230 HRS, il-JUN-96. LOGS WERE DRILL-PIPE CONVEYED. TD WAS NOT TAGGED. AFTER LOG CALIPER VERIFICATION NOT AVAILABLE DUE TO LINKAGE BEING DAMAGED WHILE RETRIEVING TOOL FROM WELL. SP WAS NOT RESPONSIVE DUE TO HIGH CL MUD. NOT PRESENTED PER GEOLOGIST'S REQUEST. BECAUSE THE FIELD BLUELINE REPEAT PASS GOES DEEPER THAN THE FIELD MAIN PASS, BP REQUESTED THAT ON THIS LDWG THE DEEPER PASS (FIELD REPEAT) BE PRESENTED AS THE MAIN PASS. THE FIELD MAIN PASS IS PRESENTED ON THIS LDWG AS THE REPEAT PASS. NEUTRON LOG PARAMETERS: SANDSTONE MATRIX, CALIPER CORRECTED, CASING CORRECTIONS OFF, SALINITY = 0.00 PPM. PER CLIENTS mEQUEST, ENVIRONMENTAL & TOm~'ADO CHART CORRECTIONS WERE APPLIED TO DLL/MLL DATA. THE MLL WAS CORRECTED FOR BOREHOLE EFFECTS & AN "RXO" CURVE WAS OUTPUT. THE DLL DATA WAS ALSO CORRECTED FOR BOREHOLE EFFECTS. THE CORRECTED DLL DATA WAS THEN USED IN THE ATLAS TORNADO CHART TO GET "RT" & "DI" CURVES. RXO = RESISTIVITY OF FLUSHED ZONE RT = TRUE FORMATION RESISTIVITY DI = DEPTH OF INVASION. FILE HEADER FILE NUMBER: 1 EDITED OPEN HOLE MAIN PASS Ail tool strings; hole data. DEPTH INCREMENT: FILE SUMMARY PBU TOOL CODE START DEPTH GR 10115.0 DAS 10115.0 DLL 10115.0 2446 10115.0 BASELINE CURVE FOR SHIFTS: GR CURVE SHIFT DATA (MEASURED DEPTH) depth shifted and clipped curves; .5000 STOP DEPTH 11326.0 11350.0 11402.0 11332.0 BASELINE DEPTH 10130.5 10132.0 10136.5 10139.0 10147.5 10149.0 10153.5 10157.0 10158.5 10160.5 10163.0 10167.0 10173.0 10175.0 10188.5 10205.0 10205.5 10221.5 10225.0 10232.5 10235.0 10239.0 10241.0 10243.0 10263.5 10267.0 10269.5 10286.5 10295.0 10314.0 10314.5 10324.5 10335.5 10338.0 10340.0 10340.5 10342.0 10342.5 10356.5 10359.5 MLL 10139.5 10147.5 10148.5 EQUIVALENT UNSHIFTED DEPTH LLD DT NPHI 10131.0 10130.5 10132.5 10136.5 10136.5 all runs merged; 10149.5 10149.0 10149.0 10154.0 10157.0 10158.5 10158.5 10160.0 10163.0 10163.0 10167.0 10167.5 10167.0 10167.0 10173.0 10175.5 10175.0 10175.0 10188.0 10204.5 10205.5 10205.5 10221.5 10221.5 10225.0 10225.0 10232.5 10232.5 10235.0 10235.0 10235.0 10239.0 10240.5 10243.0 10264.0 10267.5 10270.0 10269.5 10286.0 10295.5 10313.5 10314.0 10324.5 10324.5 10334.5 10337.5 10338.5 10337.5 10340.0 10339.5 10342.0 10343.5 10342.5 10356.5 10356.0 10357.0 10356.0 10359.5 no case 10370~0 10370.5 10375.0 10376.0 10378.5 10382.5 10385.0 10386.5 10387.0 10390.5 10391.0 10406.5 10407.0 10409.0 10409.5 10411.5 10423 .5 10435.0 10435.5 10437.5 10457.0 10457.5 10478.0 10479.5 10487.5 10515.0 10515.5 10541.0 10574.5 1O580.O 10582.5 1O585.0 10585.5 10621.0 10624.0 10629.5 10643.0 10653.0 10664.5 10684.0 10698.5 10699.0 10701.0 10704.0 10710.0 10712.5 10716.5 10725.5 10738.5 10759.5 10837.5 10841.0 10880.0 10922.0 10976.0 10976.5 10980.5 11040.5 11041.5 11043.5 1037~. 0 10584.5 10698.0 10701.0 10704.5 11040.5 10368.5 10375.5 10378.0 10390.0 10405.5 10409.0 10411.0 10434.5 10456.5 10478.0 10514.5 10583.5 10585.5 10624.0 10922.0 10981.0 11040.5 11044.0 10370.5 10382.5 10385.0 10387.0 10407.5 10409.5 10411.5 10436.0 10574.5 10585.0 10629.0 10643.5 10652.5 10664.0 10685.0 10698.5 10700.5 10705.0 10714.0 10726.0 10759.5 10840.5 10880.0 10975.0 10980.0 11041.0 10~9.5 10374.5 10382.5 10385.0 10386.0 10390.5 10408.5 10411.5 10423.5 10437.0 10457.0 10479.5 10487.0 10515.0 10540.5 10574.5 10581.0 10621.0 10629.0 10643.5 10652.5 10664.0 10685.0 10698.5 10700.5 10704.0 10710.0 10717.0 10726.0 10738.0 10759.5 10836.5 10840.5 10880.0 10921.5 10975.5 10980.0 11041.0 I 66 966 69 ~ I 66 966 69 f I 9I 0£9 69 ~ I IO 0I£ 6~ f po~ sIO clK~ clK~ ~zTs S~ I 89 S~G SNHI S~ I 89 S~G GMM~ s~Tu~ s~Idm~S spoo IOO~ :ssA~no SI YOts~qlf : i~IS H~OqS H~HOH : NiiOO X~ ~OHG~Hd : NM ~AE-~ : NM NOI~f~OqdXZ d~ : NO ~flO' ~HOL~-Na Z / ,T,flO' £HO,T,~N& & / ,T,flO' EHO,T,~4& & / ,T,flO' IHO,T,~4& & / 'IHdM HLIM GZL~IHS ZHZM iOflN ~ 'Gqq HLIM GZL~IHS ZHZM IG ~ 'iH 'qqH H~IM ~Z~IHS Z~M SHZ~ ~ '~NZ~ 'HZ~H 'OX~ 'Iq~O 'SS~d NI~I4 go uoY~od ZqOH 0'g££II 0'SIIOI P I 0'g0PII 0'SIIOI P I 0'0S£II 0'SIIOI P I 0'9g£II 0'~IIOI P I ZS~ ZDHZN ~0~ ZDMZN 'ON SS~d 'OM Ni1H S' £I£II S' CI£II 0'8£~I1 0'8£~1I 0'L£III 0'£LIII O'060IT O'060II S'TSOII S'TSOTI S'S~nTI S'SPOII S'69£TT 0'SL~II S'6P0IT S'ST£TI S'9£~II S'LSIII O'gTTTT O'~OTTT O'OSOTT 0'0££II O' ~5£IT 0 · 6T £TI S' £T£II 0'8£~TI 0'8£~II 0'9£5II 0'LtIII S'LSIII 0'6IIII 0'~0III 0'060II 0'~SOII 0'0SOII S'6P0II 0~9~0II 5 'CALi'DLL 68 1 6 RXO DLL 68 1 7 MLL DLL 68 1 8 LL3 DLL 68 1 9 LLD DLL 68 1 10 RT DLL 68 1 11 DI DLL 68 1 12 MTEM DLL 68 1 13 NPHI 2446 68 1 14 FUCT 2446 68 1 15 NUCT 2446 68 1 * DATA RECORD (TYPE# 0) Total Data Records: 176 IN 4 OHMM 4 OHMM 4 OHMM 4 OHMM 4 OHMM 4 IN 4 DEGF 4 PU-S 4 CPS 4 CPS 4 966 BYTES * 60 4 17 995 99 4 17 995 99 4 17 995 99 4 17 995 99 4 17 995 99 4 17 995 99 4 17 995 99 4 17 995 99 4 47 995 99 4 47 995 99 4 47 995 99 Tape File Start Depth = 11413.000000 Tape Pile End Depth = 10100.000000 Tape File Level Spacing = 0.500000 Tape File Depth Units = Feet **** FILE TRAILER **** LIS representation code decoding summary: Rep Code: 68 42033 datums Tape Subfile: 2 409 records... Minimum record length: Maximum record length: 62 bytes 966 bytes 0'SIIOI 0'SIIOI 000'9 0'0081 0'f0~II 0'8L66 0't09II 0'~IgII 96-N/lD-EI 6££ 96-Hil~-II 0£~ ~'~ S~I~O~ 96-Nfl~-II : (NI)ZZIS LI~ ZqOH ~ ©MIS~D ~Ntf ~qOH~HO~ SIM SIM k~fqS ND 05I 0SI qAMS ZdXL qO0~ Z~OD qO0~ ~OGNZA (HO~O~ O~ d0L) DNI~LS qO0~ : (HHd~) ~ZZdS : (~) q~AHZLNI ©Oq : (L~) ~Z©©Oq ~L : (L~) ~Zq%I~ ~L :MO£LO~ ~0 ~Z©©Oq ZNIL :GZGNZ NOIL~q~OHIO ZMIL : MOISHZA tfLtf~ %{Z(I%fZH 0'£££II 0'5800I 0'08£I1 0'~800I 0'£0~II 0'~800I qqM fi'0fi£II 0'5800I 0't~CII 0'~800I HL~Z~ ~OLS HL~ LRIfLS Z~OD qOOL HO~NZA OOfiZ' I I · un~ ~ed sBui~s IOO~ ss~d u~em ~eq~o ~og SelI~ Xq pe~olIOg (I~AZe~uI ~iqoo~eiPeS eq~ ~glqs q~dep oj pesn Bui~s IO~Uoo q~d~p Axem!xd) ~s~ig p~u~ss~d un~ ~iqoo~ipes ~og I# Buyers IooL ~s~I!g s~dss uI Builds ioo~ pue un~ qoes ~o~ e~ep xspesq BoI pue s~A~nD SS~d NIlZq~ ZqOH NZdO MIR{ :~Z~MO/q Z~I~ ~ZGtfZH Z%I~ :HZ~MflN S$V6 :~Z~Mi1H ©NI~iS qOOi SIq :edK~ sT £ elT~qnS edeL BOREHOLE CONDITIONS MUD TYPE: MUD DENSITY (LB/G): MUD VISCOSITY (S) : MUD PH: FLUID LOSS (C3) : MAXIMUM RECORDED TEMPERATURE (DEGF): RESISTIVITY (OHMM) AT TEMPERATURE (DEGF) MUD AT MEASURED TEMPERATURE (MT): MUD AT BOTTOM HOLE TEMPERATURE (BHT) : MUD FILTRATE AT MT: MUD FILTRATE AT BHT: MUD CAKE AT MT: MUD CAKE AT BHT: NEUTRON TOOL TOOL TYPE (EPITHERMAL OR THERMAL) : MATRIX: MATRIX DENSITY: HOLE CORRECTION (IN): TOOL STANDOFF (IN): REMARKS: MAIN PASS. $ CN WN FN COUN STAT : BP EXPLORATION (ALASKA) : B-27A : PRUDHOE BAY : NORTH SLOPE : ALASKA PRO-FLO 9.00 68.0 8.5 4.6 218.0 .083 .028 .080 .000 .105 .000 THERMAL SANDSTONE .00 6.000 .0 74.0 218.0 74.0 .0 74.0 .0 * FORMAT RECORD (TYPE# 64) ONE DEPTH PER FRAME Tape depth ID: F 19 Curves: Name Tool Code Samples Units API API API API Log Crv Crv Size Length Typ Typ Cls Mod 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 GR DAC 68 1 GAPI DT DAC 68 1 US/F CHT DAC 68 1 LB TTEN DAC 68 1 LB TEN DAC 68 1 LB SPD DAC 68 1 F/MN CAL MLL 68 1 IN RXO MLL 68 1 OHMM RMLL MLL 68 1 OHMM RS DLL 68 1 OHMM RD DLL 68 1 OHMM RT DLL 68 1 OHMM DI DLL 68 1 IN WTBH DLL 68 1 DEGF CNC 2446 68 1 PU-S 4 56 310 01 1 4 56 995 99 1 4 56 635 99 1 4 56 635 99 1 4 56 635 99 1 4 56 636 99 1 4 20 280 99 1 4 20 935 02 1 4 20 270 03 1 4 17 220 09 1 4 17 220 10 1 4 17 120 46 1 4 17 120 44 1 1 1 4 17 995 99 4 47 995 99 16 'CN ' 2446 68 1 PU-L 4 17 CNCF 2446 68 1 PU-S 4 18 LSN 2446 68 1 CPS 4 19 SSN 2446 68 1 CPS 4 * DATA RECORD (TYPE# 0) Total Data Records: 488 966 BYTES * 4 ~7 890 01 4 47 995 99 4 47 334 31 4 47 334 30 76 Tape File Start Depth = 11413.000000 Tape Pile End Depth = 9950.000000 Tape Pile Level Spacing = 0.250000 Tape File Depth Units = Feet **** FILE TRAILER **** LIS representation code decoding summary: Rep Code: 68 117061 datums Tape Subfile: 3 576 records... Minimum record length: Maximum record length: 62 bytes 966 bytes Tape Subfile 4 is type: LIS FILE HEADER FILE NUMBER: 3 RAW OPEN HOLE REPEAT PASSES Curves and log header data for each pass, tool string, and run in separate files. RUN NUMBER: TOOL STRING NUMBER: PASS NUMBER: DEPTH INCREMENT: FILE SUMMARY 1 1 3 .2500 VENDOR TOOL CODE START DEPTH STOP DEPTH GR 10008.0 11304.0 DAC 10081.0 11327.0 MLL 10085.0 11380.0 DLL 10062.0 11357.0 2446 10015.0 11311.0 $ LOG HEADER DATA DATE LOGGED: SOFTWARE VERSION: TIME CIRCULATION ENDED: TIME LOGGER ON BOTTOM: TD DRILLER (FT) : TD LOGGER (FT) : TOP LOG INTERVAL (FT) : BOTTOM LOG INTERVAL (FT) : LOGGING SPEED (FPHR) : TOOL STRING (TOP TO BOTTOM) VENDOR TOOL CODE TOOL TYPE SWVL ISO ISO TTRM COMR KNJT GR CN KNJT DAC SLAM KNJT MIS DLL MIS KNJT MLL $ SWIVEL ISOLATION SUB ISOLATION SUB TEMPERATURE COMMON REMOTE KNUCKLE JOINT GAMMA RA¥ COMPENSATED NEUTRON KNUCKLE JOINT DIGITAL ACOUSTILOG SLAM ADAPTER KNUCKLE JOINT MASS ISOLATION SUB DUAL LATEROLOG MASS ISOLATION SUB KNUCKLE JOINT MICRO LATEROLOG BOREHOLE AND CASING DATA OPEN HOLE BIT SIZE(IN): DRILLER'S CASING DEPTH (FT) : LOGGER'S CASING DEPTH (FT) : BOREHOLE CONDITIONS il-JUN-96 ECLIPS 2.2 230 il-JUN-96 48 12-JUN-96 11415.0 11407.0 9978.0 11404.0 1800.0 TOOL NUMBER 3944XA 3997XA 3997XA 3981XA 3510XA 3923XA 1329XA 2446XA 3923XA 1680MA/1667EA 3516XA 3921NA 3967XB 1229EA/MA 3967XA 3921NA 1233XA 6.000 10115.0 10115.0 I 66 966 £f f f I I0 068 £f f f I 66 966 £f f f I 66 966 ti f f T 9~ 0ET £I ~ 9 I 0I 0~ £I ~ ~ I 60 0~ £I 9 9 I G0 0£E 0~ ~ ~ I ~0 9£6 0~ ~ ~ T 66 08~ O~ ~ 9 I 66 9£9 99 9 9 I I0 0I£ 99 ~ f poM sIO clAi clAi q~Busq szis S-~d T 89 SCPg MD~D £T q-~d T 89 SCPE MO 9T S-~d I 89 SCPg OMO SI MI I 89 ~ IG £I NNHO I 89 %~ ~H II NNHO I 89 %qG SH 0I NNHO I 89 %qN ~qNH 6 NNHO I 89 %qN OXH 8 MM/~ I 89 OU~ ~dS 9 ~q I 89 DUG MZL 9 ~q I 89 DUG MZIL ~ ~q I 89 DUG IH~ £ ~/SD I 89 DU~ i~ ~ SqTUg ssIdm~S spoo IOOl smwM :ssAxno 6T ~ :GI Mqd~p ~del , 0'~t 0' 0'~t 0'SIE 0'~t . 000'9 00' 000 ' 90I ' 000 ' 080 ' SE0 ' £80 ' 0'8I~ 9'f 9'8 0'89 00'6 O~-O~d Z~OqS HIHOH : XU~ ZOH~Hd : (~MSUqU) MOII~HOqdXZ ~ : NnOD NM MD ' SSU~ IUZdZH : SM~ZH : (MI) ,~,~OGhKf,l,S : (MI) MOILDZHHOD Z~OH :XIISMZ~ XIHL~M :XIHL~ :(~fkU~HZHL HO ~HZHIIdZ) ZdXi ~OOi qOOi MO~IDZM 18 ~LSN ~ 2435 68 1 CPS 19 SSN 2435 68 1 CPS * DATA RECORD (TYPE# 0) Total Data Records: 476 966 BYTES * 4 43 334 31 4 43 334 30 76 Tape File Start Depth = 11388.000000 Tape File End Depth = 9962.000000 Tape File Level Spacing = 0.250000 Tape File Depth Units = Feet **** FILE TRAILER **** LIS representation code decoding summary: Rep Code: 68 156134 datums Tape Subfile: 4 . 562 records... Minimum record length: Maximum record length: 62 bytes 966 bytes Tape Subfile 5 is type: LIS 96/ 6/ 3 01 **** REEL TRAILER **** 96/ 6/13 O1 Tape Subfile: 5 2 records... Minimum record length: 132 bytes Maximum record length: 132 bytes End of execution: Thu 13 JUN 96 8:09p Elapsed execution time = 4.40 seconds. SYSTEM RETURN CODE = 0