Department of Commerce, Community, and Economic Development
Alaska Oil and Gas Conservation
Commission
HOME
EVENTS
DATA
Data List
Drilling
Production
Orders
Data Miner
Document Search
REPORTS
Reports and Charts
Pool Statistics
FORMS
LINKS
Links
Test Notification
Data Requests
Regulations
Industry Guidance Bulletins
How to Apply
ABOUT US
History
Staff
HELP
Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
190-078
New Plugback Esets 8/13/2024 Well Name API Number PTD Number ESet Number Date 1E-28A 50-029-20832-01-00 213-095 T39403 5-15-2014 1E-112 50-029-23211-70-00 204-091 T39404 10-19-2004 3N-14APB1 50-029-21589-70-00 207-119 T39405 2-3-2009 Nikaitchuq 3 PB1 50-629-23242-70-00 205-001 T39406 5-23-2005 Nikaitchuq 3 PB2 50-629-23242-71-00 205-001 T39407 5-23-2005 Nikaitchuq 3 PB3 50-629-23242-72-00 205-001 T39408 5-23-2005 ODSK-41 PB1 50-703-20585-70-00 208-147 T39409 2-27-2009 ODSN-26 PB1 50-703-20642-70-00 211-121 T39410 2-1-2012 ODSN-26 PB2 50-703-20642-71-00 211-121 T39411 2-1-2012 ODSN-29 PB1 50-703-20661-70-00 212-106 T39412 6-12-2013 ODSN-29 PB2 50-703-20661-71-00 212-106 T39413 6-12-2013 Z-05APB1 50-029-22056-70-00 190-078 T39414 10-13-2013Z-05APB1 50-029-22056-70-00 190-078 T39414 10-13-2013 Pages NOT Scanned in this Well History File XHVZE This page identifies those items that were not scanned during the initial scanning project. They are available in the original file and viewable by direct inspection. /¢~'0/~ File Number of Well History File PAGES TO DELETE Complete RESCAN [] [] Color items - Pages: Grayscale, halftones, pictures, graphs, charts - Pages: [] Poor Quality Original - Pages: [] Other- Pages: DIGITAL DATA [] Diskettes, No. [] Other, No/Type OVERSIZED [] Logs of various kinds ~/ Other COMMENTS: Scanned by: Beverly~,~ Vincent Nathan Lowell TO RE-SCAN Notes: Re-Scanned by: Bevedy Bran Vincent Nathan Lowell Date: Is~ NOTScanned.wpd • UNSCANNED, OVERSIZED MATERIALS AVAILABLE: ~ FILE # To request any/all of the above information, please contact: Alaska Oil & Gas Conservation Commission + 333 W. 7th Ave., Ste. 100 Anchorage, Alaska 99501 Voice (907) 279-1433 }Fax (907) 276-7542 RECEIVED STATE OF ALASKA OCT 0 8 2013 ALASKA OIL AND GAS CONSERVATION COMMISSION WELL COMPLETION OR RECOMPLETION REPORT AND LOGAOGCC la. Well Status: 0 Oil 0 Gas 0 SPLUG 0 Other ®Abandoned 0 Suspended 1b. Well Class 20AAC 25.105 20AAC 25.110 0 Exploratory 0 Stratigraphic 0 GINJ 0 WINJ 0 WAG 0 WDSPL 0 Other No.of Completions Zero ®Development 0 Service 2. Operator Name: 5.Date Comp.,Susp.,or Aband.: 12. Permit to Drill Number: BP Exploration (Alaska) Inc. 9/11/2013 ' 190-078 313-423 3. Address: 6.Date Spudded: 13. API Number: P.O. Box 196612,Anchorage,Alaska 99519-6612 7/4/1990 ' 50-029-22056-00-00 ' 4a. Location of Well(Governmental Section): 7.Date T.D.Reached: 14. Well Name and Number: Surface: 7/18/1990 PBU Z-05 • 975'FNL, 1357'FWL, Sec. 19,T11N, R12E, UM 8. KB(ft above MSL): 92.51' 15.Field/Pool(s) Top of Productive Horizon: 641'FSL, 1717' FEL, Sec. 13,T11N, R11 E, UM GL(ft above MSL): 54.31' Prudhoe Bay/Prudhoe Bay . Total Depth: 9.Plug Back Depth(MD+TVD) 796'FSL, 1886' FEL, Sec. 13,T11N, R11 E, UM 9694' 8681' 4b. Location of Well(State Base Plane Coordinates,NAD: 10.Total Depth(MD+TVD) 16. Property Designation: Surface: x- 599081 y- 5959100 Zone- ASP4 ' 10300' • 9190' . ADL 028262&028245 TPI: x- 595986 y- 5960675 Zone- ASP4 11.SSSV Depth(MD+TVD) 17. Land Use Permit: Total Depth:x- 595815 Y- 5960829 Zone- ASP4 None 18.Directional Surve : 19.Water depth,if offshore: 20. Thickness of Permafrost(ND): y ❑Yes ®No (Submit electronic and printed information per 20 AAC 25.050) N/A ft MSL 1892' 21.Logs Obtained (List all logs here and submit electronic and printed information per 20 AAC 25.071): 22.Re-Drill/Lateral Top Window MD/ND: DIFL/BHC/CNL/GR, RFT N/A 23. CASING, LINER AND CEMENTING RECORD SETTING DEPTH MD SETTING DEPTH ND HOLE AMOUNT CASING WT.PER FT. GRADE TOP BOTTOM TOP BOTTOM SIZE CEMENTING RECORD PULLED 20" _ 91.5# H-40 Surface 110' Surface 110' 10-3/4" _ 45.5# L-80 Surface 2688' Surface 2688' 13-1/2" 1949 cu ft Permafrost 7-5/8" 29.7# L-80 Surface 9678' Surface 8667' 9-7/8" 1214 cu ft Class'G' 5-1/2" 17# NT80 9391' 10300' 8424' 9190' 6-3/4" 196 cu ft Class'G' 24. Open to production or injection? 0 Yes IS No 25. TUBING RECORD If Yes,list each interval open SIZE DEPTH SET MD PACKER SET(MD/ND (MD+ND of Top&Bottom;Perforation Size and Number): ( ) ) 3-1/2",9.2#, L-80 9389', 9330'/8373' 10111'- 10121' 10111'/9037' r I.1.111 26. ACID,FRACTURE,CEMENT SQUEEZE,ETC. SCANNED tv1A WAS HYDRAULIC FRACTURING USED DURING COMPLETION?❑Yes ®No l�1`hh DEPTH INTERVAL(MD) AMOUNT AND KIND OF MATERIAL USED 9726' Set Whipstock(Cement w/8.1 Bbls Class'G') 9694' Set Whipstock 27. PRODUCTION TEST Date First Production Method of Operation(Flowing,Gas Lift,etc Not on Production _ N/A Date of Test Hours Tested Production For OIL-BBL: GAS-MCF: WATER-BBL: CHOKE SIZE: GAS-OIL RATIO: Test Period Flow Tubing Casing Press: Calculated OIL-BBL: GAS-MCF: WATER-BBL: OIL GRAVITY-API(CORR): Press. 24-Hour Rate 28. CORE DATA Conventional Core(s)Acquired? 0 Yes 0 No Sidewall Core(s)Acquired? 0 Yes 0 No If Yes to either question,list formations and intervals cored(MD+ND of top and bottom of each),and summarize lithology and presence of oil,gas or water (submit separate sheets with this form,if needed). Submit detailed descriptions,core chips,photographs and laboratory analytical results per 20 AAC 250.071. None %' 9 RBDMS 1 'l LA 6 Form 10-407 Revised 10/2012CONTINUED ON REVERSE j �` Submit Original Only 11/231(4- , om, ,.,.sem s ) 29. GEOLOGIC MARKERS(List all formations ani <ers encounter 30. FORMATION TESTS NAME MU ND Well Tested? 0 Yes ®No Permafrost Top If yes,list intervals and formations tested,briefly summarizing test Permafrost Base results. Attach separate sheets to this form,if needed,and submit detailed test information per 20 AAC 25.071. Sag River 9680' 8869' None Shublik A 9717' 8701' Zone 4 9890' 8851' Formation at Total Depth: 31.List of Attachment Summary of Pre-Rig Work,Summary of Daily Drilling Reports,Well Schematic Diagram 32.I hereby certify that the foregoing is true and correct to the best of my knowledge. Contact: Nathan Sp 564-4258 Email: Nathan.Sperry@bp.com Printed::n:ure:Joe Lastu a Title: Drilling Technologist /p Phone 564-4091 Date: IO/t/I3 INSTRUCTIONS General: This form is designed for submitting a complete and correct well completion report and log on all types of lands and leases in Alaska. Submit a well schematic diagram with each 10-407 well completion report and 10-404 well sundry report when the downhole well design is changed. Item 1 a: Classification of Service Wells: Gas Injection,Water Injection,Water-Alternating-Gas Injection,Salt Water Disposal,Water Supply for Injection, Observation,or Other. Multiple completion is defined as a well producing from more than one pool with production from each pool completely segregated. Each segregated pool is a completion. Item 4b: TPI(Top of Producing Interval). Item 8: The Kelly Bushing and Ground Level elevation in feet above mean sea level. Use same as reference for depth measurements given in other spaces on this form and in any attachments. Item 13: The API number reported to AOGCC must be 14 digits(ex: 50-029-20123-00-00). Item 20: Report true vertical thickness of permafrost in Box 20. Provide MD and ND for the top and base of permafrost in Box 28. Item 23: Attached supplemental records for this well should show the details of any multiple stage cementing and the location of the cementing tool. Item 24: If this well is completed for separate production from more than one interval(multiple completion),so state in item 1,and in item 23 show the producing intervals for only the interval reported in item 26. (Submit a separate form for each additional interval to be separately produced, showing the data pertinent to such interval). Item 27: Method of Operation: Flowing,Gas Lift,Rod Pump,Hydraulic Pump,Submersible,Water Injection,Gas Injection,Shut-In,or Other(explain). Item 28: Provide a listing of intervals cored and the corresponding formations,and a brief description in this box. Submit detailed description and analytical laboratory information required by 20 AAC 25.071. Item 30: Provide a listing of intervals tested and the corresponding formation,and a brief summary in this box. Submit detailed test and analytical laboratory information required by 20 AAC 25.071. Form 10-407 Revised 10/2012 Submit Original Only Z-05, Well History (Pre Rig Sidetrack) Date Summary 08/10/13 SET SLIP STOP C-SUB(serial#SS-32)@ 6034'SLM. PULL ST#5 RM-OGLV @ 5772'SLM/5791'MD, PULL ST#6 RM-LGLV @ 3072'SLM/3096'MD. SET ST#6 RM-DGLV @ 3072'SLM/3096'MD LRS LOAD IA W/220 BBLS CRUDE. SET ST#5 RM-DGLV @ 5772'SLM/5791'MD. PULL SLIP STOP CATCH (serial#SS-32) FROM 6034'SLM. DRIFT TBG WITH 2.56"SWAGE, 2.70"CENT, 2.5 S- BAILER TO 9331'SLM(no sample recovered). RAN 3-1/2"BLB,2.50"SCALE BUCKET TO 9500'SLM( 3 small pieces of scale recovered). 08/10/13 T/I/O 2720/1360/231 Temp=S/I Assist SSI with MIT-IA PASS to 3000 psi. Pumped 5 bbls Neat MEthanol followed by 225 bbls Dead Crude down IA to load. Pumped 5 bbls Neat Methanol followed by 123 bbls Dead Crude down TBG to load. Pumped 3.8 bbls Dead Crude down IA to achieve 3000 psi MIT- T test pressure. IA lost 65 psi in the 1st 15 min and 28 psi in the 2nd 15 min for a total loss of 93 psi over the 30 min test. Bleed-4.5 bbls BAck. SSL in control of well notified pad op upon departure. FWHP= 574/497/219. SV/W/SSV/M=SSL. IA/OA=OTG. 08/11/13 DRIFT TBG W/3-1/2" BLB,2.625"GAUGE RING TO 9328'SLM. RAN 3-1/2" BRUSH,2.53"SCALE BUCKET,WORK THRU TIGHT SPOT AT 9328'SLM, S/D AT 9354'SLM,JAR DOWN TO GET THRU, WORK TOOLS THRU TIGHT SPOTS, DRIFT DOWN TO 9900'SLM, NO PROBLEMS(recovered 5 small pieces of scale). 08/13/13 CTU#3 w/1.5"CT. Objective: Mill Scale. MIRU. 08/14/13 CTU#3 w/1.5"CT. Objective: Mill Scale. MIRU. MU a BKR motor&stringreamer w/a 2.74" DPM. Open up and kill well w/slick 1% KCI. RIH milling from 2000-9200'. Dry drifted to 9313'. Milled through tubing 9300-9400'. Reciprocated across from 9200-9400'three times. Milled down to 9822' (target depth 9800' MD). POOH while backreaming. Gauged mill at 2.71"and string reamer at 2.70". Plan forward change from Anchorage: underream scale in 5-1/2"liner. Stand by for underreamer. RIH to 9400. Underream 5- 1/2"liner with Baker 3-Blade Underreamer(OD with blades open =4.65")from 9400'-9800'. No motor work seen. Underream while PUH up to 9400'. No motor work seen. POOH. Perform BOP test. 08/15/13 ATTEMPT TO DRIFT W/20'x2.70"D.WHIPSTOCK, S/D @ 9321' UNABLE TO PASS THRU. DRIFT W/ 3-1/2" BLB, 2.625"G.RING,TAG HARD BOTTOM @ 10076'SLM,WORK TOOLS THOROUGHLY TO CLEAN UP TBG BETWEEN 9300-9350'SLM. DRIFT W/10'x2.70 DUMMY WHIPSTOCK, SD @ 9323' SLM, UNABLE TO PASS. 08/16/13 DRIFT W/15'x2.622"BAKER DRIFT&5'2-5/8"STEM, SD @ 9323'SLM, UNABLE TO PASS. DRIFT W/ 2.70"CENT, DRIFT CLEANLY INTO 5-1/2" LINER, NO ISSUES. DRIFT W/3-1/2"GR, 3-1/2" BAIT SUB, 15'x2.622" BAKER DRIFT, SD @ 9323'SLM, UNABLE TO PASS. HOT B&F W/3-1/2" BLB,2.73" G.RING,THOROUGHLY BRUSH TBG FROM 9300'-9370'SLM,TBG APPEARS TO BE CLEAR. DRIFT W/15'x2.622"BKR DRIFT&5'x2-5/8"STEM, S/D @ 9323'SLM, UNABLE TO PASS LRS PUMP 124 BBLS BBLS COLD SEAWATER, S/D @ 9355'SLM,ABLE TO DRIFT TO 9850'SLM W/ 15'x2.622" BAKER DRIFT&5'x2-5/8"STEM(see log for details). 08/16/13 T/I/O=0/450/200 Temp=SI Assist Slickline w/brush&flush. Pumped 2 bbls of meth followed by 85 bbls of 180*diesel to assist Slickline with Brush and Flush. Pumped 3 bbls of meth followed by 124 bbls of 55*kcl. Pumped 2 bbl meth spacer followed by 23 bbls of diesel for freeze protect. IA,OA=otg FWHP 15/50/180 Slickline on well of departure, DSO notified. 08/17/13 CTU#3 w/1.5"CT(CTV=22.9). Objective-Pre-CTD dummy whipstock drift. MIRU CTU#3 from F-08. RIH w/BTT dummy WS drift assy(2.69"max OD)to 9815'CTM w/no wt loss. POH. FP wellbore. Page 1 of 2 Z-05, Well History (Pre Rig Sidetrack) Date Summary 08/18/13 CTU#3 w/1.5"CT(CTV=22.8). Objective-Run Dummy WS drift for CTD prep. RDMO to L-214. 08/26/13 T/I/0=500/500/250; Conduct Pre-CTD torque and Test for Nordic 1. 09/02/13 T/I/O=SSV/360/210.Temp=SI. Bleed IAP&OAP to 0 psi (pre RWO).AL SI @ casing valve,ALP= 1900 psi. IA&OA FL= near surface. 09/03/13 T/I/O=SSV/360/210.Temp=SI. Bleed IAP&OAP to 0 psi(pre RWO).AL SI @ casing valve,ALP= 1900 psi. IA&OA FL=near surface. Held and open bleed on the IA&OA for 5 hours. SI &onitored for 30 minutes, IAP increased 2 psi&OAP increased 2 psi. Job complete. Final WHP's=SSV/2/2. SV,WV, SSV=Closed. MV=Open. IA&OA=OTG. NOVP. 0415. 09/03/13 T/I/O=SSV/10/6.Temp=SI.WHPs(CTD Prep), post bleed.AL SI @ casing valve&tagged out, needle valves open. IAP increased 8 psi, OAP increased 4 psi overnight. SV,WV, SSV=C. MV=0. IA, OA= OTG. NOVP. 1110. 09/04/13 T/I/O=BPV/14/24.Temp=Sl.WHPs(Pre-CTD).AL SI @ casing valve.ALP=0 psi. Tie in crew on well performing disconnect. 1140. 09/04/13 T/I/0=450/450/200 Set 3"CIW"H" BPV. PT'd upper tree..Pass.Job complete. 09/06/13 T/I/O= BPV/25/50.Temp=SI. Bleed IAP&OAP to 0 psi (pre CTD).AL,flowline, and wellhouse removed. IA&OA FL near surface. Bled IAP in <1 min(all gas). Bled OAP to 0 psi in 10 min(all gas). Held open bleed for 20 min. No monitor CTD ready to move onto the well. Nordic in control of valves upon departure. 1130. 09/10/13 T/I/0=420/0/0 Conducted PJSM w/Nordic 1 crew. R/U lubricator, PT'd, Pulled 3"CIW"H"BPV#315 thru stack. see log for details. 09/12/13 T/I/0=0/0/0 Conducted PJSM w/nordic 1 crew. Shut master.Torqued all flanges above master to specs. Nordic 1 crew to PT. Page 2 of 2 North America-ALASKA-BP Page 1 of 23 Operation Summary Report Common Well Name:Z-05 AFE No Event Type:RE-ENTER-ONSHORE(RON) Start Date:9/3/2013 End Date:9/18/2013 X3-0145H-C:DRILL(3,189,228.00) Project:Prudhoe Bay Site:PB Z Pad Rig Name/No.:NORDIC 1 Spud Date/Time:7/4/1990 12:00:00AM Rig Release:9/23/2013 Rig Contractor:NORDIC CALISTA UWI: Active datum:Z-05 @92.51 usft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (usft) 9/3/2013 14:00 - 00:00 10.00 MOB P PRE MOVE OFF OF C-41. STAGE RIG ON C-PAD WHILE MATTING ROADS,WAITING ON ORDERS TO PROCEED. -CONDUCT MAINTENANCE ON RIG -REMOVE LOCK OUT,TAG OUT OF C-13 • -COMPLETE WELL HANDOVER,TAKE FILES TO PBOC 9/4/2013 00:00 - 06:00 6.00 MOB P PRE CONTINUE PERFORMING RIG MAINTENANCE ON C PAD IN PREPARATION FOR MOVE TO Z PAD. MOVE SATELLITE CAMP TO PRICE PAD TO 'STAGE WHILE MOVING RIG 06:00 - 08:00 2.00 MOB P PRE CHECK ALL FLUIDS,AIR PRESSURE. PJSM ON MOVING RIG WITH SECURITY, TOOLPUSHER,-NORDIC FIELD SUPERINTENDENT,CREW. 08:00 - 12:00 4.00 MOB P • PRE ,MOVE RIG DOWN C-PAD ACCESS ROAD. MOVE WENT WELL. TURN ON TO SPINE AND BEGIN MOVING UP SPINE WITH NO ISSUES. 12:00 - 14:00 2.00 MOB P PRE STOP RIG MOVEMENT CLOSE TO PRICE PAD FORA FEW MINUTES SO THAT FIELD ENGINEER CAN INSPECT ROAD,HAVE DISCUSSION WITH TOOLPUSHER ON CONCERNS WITH MOVING FORWARD. DECISION IS TO KEEP MOVING FORWARD THROUGH FRONTIER CORNER AND ONWARD TO J-PAD. 14:00 - 15:45 1.75 MOB - P I PRE STAGE RIG AT PULLOUT AT J-PAD TO ALLOW TRAFFIC TO GET BY. 15:45 - 18:00 2.25 MOB P PRE PULL BACK ONTO SPINE AND CONTINUE TO MOVE RIG. 18:00 - 00:00 6.00 MOB P PRE !CONTINUE MOVE&STOP AT M PAD ACCESS ROAD. STAGE UP OFF TO THE SIDE FOR FUEL,WATER&OFFLOAD WASTE TANK. LET TRAFFIC AROUND&CONTINUE MATTING ROAD AHEAD. 9/5/2013 00:00 - 09:00 9.00 MOB P PRE RIG STAGED AT POINT IN FRONT OF EAST CHANNEL OF KUPARAK RIVER. CONTINUE AWAITING RIG MATS TO BE LAID IN ORDER TO MOBILIZE TO Z-PAD. 09:00 - 13:45 4.75 MOB P PRE MATTING IN PLACE. PROCEED WITH MOVING •RIG BACK ONTO SPINE ROAD AND MOVE TO MOBIL PAD. 13:45 - 20:45 7.00 MOB P PRE STAGE RIG AT MOBIL PAD ACCESS ROUTE TO ALLOW VEHICLES TO GET BY AND TO STAGE MATTING FROM MOBIL PAD TO Z-PAD. 20:45 - 00:00 3.25 MOB P PRE MATS ARE LAID,CHANGEOUT TRAFFIC THROUGH. MOBILIZE RIG FROM MOBIL PAD TO Z PAD ACCESS ROAD. 9/6/2013 00:00 - 06:00 6.00 MOB P PRE Z-PAD ACCESS ROAD BEING MATTED TO Z PAD ENTRANCE. STAGE EXTRA MATS ON Z !PAD AS CONTINGENCY. LOTO Z-08,Z-09& •Z-108. 06:00 - 07:00 1.00 MOB P PRE MOBILIZE RIG FROM Z PAD ACCESS ROAD ENTRANCE TO BACK WELL ROW OF Z PAD. Printed 10/3/2013 9 28:16AM North America-ALASKA-BP "' Page 2 of 23 Operation Summary Report p;, Common Well Name.Z-05 AFE No Event Type:RE-ENTER-ONSHORE(RON) Start Date:9/3/2013 End Date:9/18/2013 IX3-0145H-C:DRILL(3,189,228.00) Project:Prudhoe Bay Site:PB Z Pad Rig Name/No.:NORDIC 1 Spud Date/Time:7/4/1990 12.00:00AM Rig Release:9/23/2013 Rig Contractor:NORDIC CALISTA UWI: Active datum:Z-05 @92.51 usft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (usft) 07:00 - 11:00 4.00 MOB P PRE DISCUSS OPTIONS WITH MOVE COORDINATOR. MAT AREAS OVER UTILIDORS AND IN SOFT AREAS OF PAD. COORDINATE WITH Z-PAD OPERATOR TO GET FREEZE PROTECT FLUIDS AROUND RIG TO FREEZE PROTECT Z-112 FOR EVENTUAL LO/TO. 11:00 - 13:00 2.00 MOB P PRE Z-112 FREEZE PROTECTED,MATTING IN PLACE FOR MOVEMENT. MEET WITH PAD OPERATOR,TOOLPUSHER FOR MEETING FOR MOVING OVER WELL Z-05. INSPECT WELL,VERIFY VALVE ALIGNMENT, PRESSURES. LOCK OUT,TAG OUT Z-112. FIELD SUPERINTENDENT ON SITE,PJSM ON 'MOVING RIG. ASSIGN POSITIONS,DISCUSS TIGHT AREAS. 13:00 - 13:30 0.50 MOB P PRE MOVE RIG OVER WELL. RIG SPOTTED OVER WELLAND RIG ACCEPT AT 1330 HRS. 13.30 - 15:30 2.00 RIGU P PRE PREPARE RIG FOR OPERATIONS. SPOT IN TIGER TANK AND HARDLINE,SPOT CUTTINGS BOX,BEGIN MOVING SUPPORT EQUIPMENT INTO PLACE. 15:30 - 19:30 4.00 RIGU N WAIT PRE Z AND W PAD SHUT DOWNS ACTIVATED,ALL WELLS WERE SHUT IN. PAD OPERATORS INVESTIGATING CAUSE. PAD OPS NOTIFY WSLTO HALT ALL ACTIVITIES AS WELL AS ALL STOP TO PARKER 273 MOVE. WAIT ON ORDERS FROM OPERATIONS. 19:30 - 00:00 4.50 RIGU P PRE ALL CLEAR FROM Z PAD OPERATOR,WELLS ARE COMING BACK ONLINE-OK TO PROCEED. WAIT FOR PARKER 273 MOVE TO W PAD ACCESS ROAD BEFORE PERFORMING ANY NU/ND OPERATIONS. PARKER 273 STAGED ON Z PAD ACCESS ENTRANCE PULL OFF. CLEAN&TIDY UP AROUND RIG. 9/7/2013 00:00 - 07:00 7.00 RIGU N WAIT PRE WAIT ON PARKER 273 TO EXIT SPINE ROAD ;BEFORE PERFORMING ND/NU OPERATIONS. BEGIN CLEANING IN PIPESHED IN PREPARATION FOR PAINT. UNLOAD RIG EQUIPMENT FROM FLATBEDS. CPARKER OFF SPINE ROAD WITH MUD MODULE AT 06:00. 07:00 - 12:00 5.00 BOPSUR P PRE ND TREE CAP AND NU BOP EQUIPMENT. TAKE ON 290 BBLS POWER PRO FLUIDS INTO PITS. -BARRIERS TO WELL:SHELL TEST TO 5000 PSI,ALL TREE VALVES CLOSED,SWAB TESTED TO 3500 PSI,MONITORING PRESSURE BETWEEN SWAB VALVE AND SSV 12:00 - 18:00 6.00 RIGU N WAIT PRE CONTINUE WITH RIG MAINTENANCE AND RE-GRADING AREA AROUND RIG FOR SATELLITE CAMP WHILE WAITING ON PARKER 273 TO GET ASSISTANCE FOR THEIR MOVE. 18.00 - 00:00 6.00 RIGU N WAIT PRE CONTINUE CLEANING ON PIPESHED FLOOR- PREPPING FOR PAINT. OPERATIONS BLED OFF AL LINE ON Z-108 TO 0 PSI. Printed 10/3/2013 9:28:16AM • • North America-ALASKA-BP Page 3 of 23 Operation Summary Report Common Well Name:Z-05 AFE No Event Type:RE-ENTER-ONSHORE(RON) Start Date:9/3/2013 End Date:9/18/2013 X3-0145H-C:DRILL(3,189,228.00) Project:Prudhoe Bay Site:PB Z Pad Rig Name/No.:NORDIC 1 Spud Date/Time:7/4/1990 12:00:00AM Rig Release:9/23/2013 Rig Contractor.NORDIC CALISTA UWI: Active datum:Z-05©92.51 usft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth I Phase Description of Operations (hr) (usft) _ 9/8/2013 00:00 - 06:00 6.00 RIGU N WAIT PRE CONTINUE WORKING ON PIPESHED FLOOR. MOVE SCS TRAILER TO Z PAD. -BARRIERS TO WELL:SHELL TEST TO 5000 PSI,ALL TREE VALVES CLOSED,SWAB TESTED TO 3500 PSI,MONITORING PRESSURE BETWEEN SWAB VALVE AND SSV 06:00 - 19:00 13.00 RIGU N WAIT PRE CREW CHANGE OUT. MOVEMENT COORDINATOR LAYING MATTING FOR PARKER 273. MARK LAYOUT FOR SATELLITE CAMP ON Z-PAD. CREW PREPPING AND PAINTING RIG AND EQUIPMENT. ATTEND PLANNING MEETING FOR MOVING PARKER 273 MODULES AND IMPACT UPON NORDIC 1 OPERATIONS SENT ELECTRONIC NOTICE TO AOGCC FOR BOP TEST AT 1815 HRS. ACCORDING TO PLANNING,ANTICIPATE BOP TEST TO BEGIN AFTER CHANGEOUT ON TUESDAY MORNING. 19:00 - 00:00 5.00 RIGU N WAIT PRE CREW CHANGE OUT. SATELLITE CAMP MOVED FROM PRICE PAD TO Z-PAD. STAGE ON Z-PAD WITH STAND-OFF IN COMPLIANCE WITH INTERIM SOP FOR SITING OF DETACHED RIG OFFICES AND PREPARE FOR OPERATIONS. BEGIN PAINTING PIPESHED FLOOR. 9/9/2013 00:00 - 06:00 6.00 RIGU N WAIT PRE CONTINUE PAINTING PIPESHED FLOOR. PARKER 273 IS ENROUTE WITH DRILLING MODULE DOWN Z PAD ACCESS ROAD. STAGE MOD AT Z PAD ENTRANCE WHILE MATS ARE LEAP FROGGED AHEAD. 06:00 - 07:45 1.75 RIGU N WAIT PRE CREW CHANGE COMPLETE,DELAYED DUE TO HAVING TO STAGE VEHICLES,GET ESCORTED PAST PARKER MODULES, TRANSFER PERSONNEL ON OTHER SIDE OF MOVE IN ORDER TO GET TO RIG FOR CHANGEOUT. -BARRIERS TO WELL:SHELL TEST TO 5000 PSI,ALL TREE VALVES CLOSED,SWAB TESTED TO 3500 PSI,MONITORING PRESSURE BETWEEN SWAB VALVE AND SSV 07:45 - 15:45 8.00 RIGU N WAIT PRE CONTINUE WITH RIG MAINTENANCE WHILE WAITING ON RIG MOVE. SWAP SATELLITE CAMP OVER TO RIG POWER. -CREW CHANGEOUT AGAIN DELAYED DUE TO JOCKEYING OF PERSONNEL PAST RIG MODULES -DISCUSSION WITH PARKER 273 TOOLPUSHER,BP FIELD ENGINEER,AND FIELD SUPERINTENDENT REGARDING TIMING OF RIG MOVEMENT AND IMPACT UPON NORDIC 1 OPERATIONS. DECISION IS TO MOBILIZE FLUIDS AND RE-SEND NOTICE TO AOGCC FOR PERMISSION TO BEGIN BOP TEST. CONTACT JIM REGG OF AOGCC, SUBMIT ELECTRONIC NOTICE AT 1545. Printed 10/3/2013 9:28:16AM • • North America-ALASKA-BP Page 4 of 23 Operation Summary Report Common Well Name:Z-05 AFE No Event Type:RE-ENTER-ONSHORE(RON) Start Date:9/3/2013 End Date:9/18/2013 X3-0145H-C:DRILL(3,189,228.00) Project:Prudhoe Bay Site:PB Z Pad Rig Name/No.:NORDIC 1 Spud Date/Time:7/4/1990 12:00:00AM Rig Release:9/23/2013 Rig Contractor:NORDIC CALISTA UWI: Active datum:Z-05 @92.51 usft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (usft) 15:45 - 17:45 2.00 BOPSUR P PRE VERIFY VALVE ALIGNMENT AND THAT THERE IS NO PRESSURE IN TREE. LINE OUT BOP TEST EQUIPMENT,FILL STACK,SET BOP TEST PLUG PER RP. SEND FOLLOW-UP EMAIL TO AOGCC PERSONNEL REGARDING PERMISSION TO BEGIN BOP TEST. WAIT ON PERMISSION TO BEGIN FROM AOGCC. NOTIFY BAKER THRU-TUBING AND DSM FOR NOTICE OF MOVEMENT. GET KCL AND POWERPRO MOVING TO RIG. PERMISSION GIVEN BY JIM REGG OF AOGCC TO PROCEED. AOGCC WAIVES WITNESS TO TEST AT 1645 HRS. 17:45 - 00:00 6.25 BOPSUR P PRE PRESSURE TEST PUMP LINES BEFORE BEGINNING BOP TEST. PERFORM PASSING BODY TEST TO 250 PSI&4500 PSI. PERFORM CREW CHANGEOUT W/ ONCOMING CREW. TEST BOP PER AOGCC,BP,AND NORDIC REQUIREMENTS. STACK CONFIGURATION IS ANNULAR,BLIND SHEARS,2"COMBI RAMS, MUD CROSS,2-3/8"COMBI RAMS,2"COMBI RAMS. PEFORM KOOMEY DRAWDOWN TEST •AS FOLLOWS: STARTING SYSTEM PRESSURE=2900 PSI DRAWDOWN PRESSURE=2050 PSI BUILD 200 PSI=15 SEC FULL RECOVERY=98 SEC 3 NITROGEN BOTTLES:1800 PSI,1900 PSI, 1900 PSI TEST WITNESSED BY WSL,TOOLPUSHER 9/10/2013 00:00 - 06:15 6.25 BOPSUR P PRE CONTINUE TESTING BOP PER AOGCC,BP, AND NORDIC REQUIREMENTS. STACK CONFIGURATION IS ANNULAR,BLIND SHEARS,2"COMBI RAMS,MUD CROSS,2-3/8" COMBI RAMS,2"COMBI RAMS. EACH TEST TAKING—20-25 MINUTES TO STABILIZE. 06:15 - 06:45 0.50 BOPSUR P PRE PERFORM RIG EVACUATION DRILL W/ALL CREWS.SIMULATED HIGH H2S ALARM. ALL CREW MEMBERS MUSTERED IN A TIMELY MANNER. A SCENARIO WAS GIVEN TO CREWS THAT A HIGH H2S ALARM SOUNDED WHILE MAKING UP TOOLS. ALL NON ESSENTIAL PERSONNEL EVACUATED WITH SCAT PACKS. ESSENTIAL PERSONNEL DONNED SCBA'S&PROPERLY SECURED THE WELL BY LIFTING THE BHA OUT OF THE WELL,CLOSING THE BLIND RAMS&HCR. THE CREW MEMBERS THEN EVACUATED TO THE MUSTER AREA,ESD'ING THE RIG ON THE WAY OUT. PROCEEDED AS LEVEL 1 INCIDENT. AAR REVEALED THAT RIG HAS EMERGENCY LIGHTING BUT A CLASS I DIV I FLASHLIGHT MAY BE NECESSARY IF A RESCUE IS NEEDED. 06:45 - 07:15 0.50 BOPSUR P PRE PERFORM CREW CHANGEOUT. Printed 10/3/2013 9:28:16AM • • North America-ALASKA-BP Page 5 of 23 Operation Summary Report Common Well Name:Z-05 AFE No Event Type:RE-ENTER-ONSHORE(RON) Start Date:9/3/2013 End Date:9/18/2013 X3-0145H-C:DRILL(3,189,228.00) Project:Prudhoe Bay Site:PB Z Pad Rig Name/No.:NORDIC 1 Spud Date/Time:7/4/1990 12:00:00AM Rig Release:9/23/2013 Rig Contractor:NORDIC CALISTA UWI: Active datum:Z-05 @92.51 usft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (usft) 07:15 - 09:30 2.25 BOPSUR P PRE CONTINUE WITH COMPLETING BOP TEST, FUNCTIONING RAMS FROM BOTH DRILLER'S CONSOLE AND FROM CTS CONSOLE. STAB ON WITH INJECTOR. PRESSURE TEST INNER REEL IRON AND INJECTOR PACKOFFS. RIG DOWN TEST EQUIPMENT,CLEAR RIG FLOOR. 09:30 - 10:00 0.50 RIGU P PRE PUMP SLACK BACK. PJSM ON POPPING OFF, CUTTING COIL. 10:00 - 10:45 0.75 RIGU P PRE POP OFF,RIG UP COIL CUTTER. CUT 250'OF COIL. REMOVE COIL CUTTER,MU QUICK TEST SUB. 10:45 - 11:00 0.25 RIGU P PRE STAB ON WITH INJECTOR,PRESSURE TEST QUICK TEST SUB. PUMP E-LINE SLACK FORWARD. POP OFF,MEG TEST E-LINE FOR CONDUCTIVITY. 11:00 - 12:30 1.50 RIGU P PRE PREPARE COIL END FOR HEADING UP WITH COIL CONNECTOR. INSTALL COIL CONNECTOR. BOOT UP AND MAKE-UP BAKER INTEQ SMART TOOLS. 12:30 - 13:00 0.50 RIGU P PRE STAB ON WITH INJECTOR. PRESSURE TEST LUBRICATOR AND COIL CHECKS TO 4450 PSI. HOLD FOR 5 MIN. GOOD TEST. NOTE- CURRENT PVT=286 BBLS,IAP=2 PSI,OAP= 60 PSI. 13:00 - 13:30 0.50 RIGU P PRE LINE UP TO PUMP FRESH WATER FROM THE RIG WATER TANK DOWN THE COIL TO PUMP SLACK FORWARD. PUMP @ 2.0 BPM,3700 PSI. PUMPED A TOTAL OF 44 BBLS OF WATER. NO CABLE MOVEMENT HEARD IN REEL HOUSE. 13:30 - 13:45 0.25 RIGU P PRE CHUGGER OUT BOP STACK,PULL BOP TEST PLUG. PULLED WITH NO PROBLEMS. 13:45 - 14:30 0.75 RIGU P PRE HOLD RIG EVACUATION DRILL AND AAR. SEVERAL GOOD LEARNINGS DISCUSSED WITH CREW IN AAR. 14:30 - 15:00 0.50 PULL P PRE HOLD PJSM WITH CREW FOR BRINGING BPV LUBRICATOR INTO RIG THRU PIPE SHED. CAN NOT BRING UP THRU BEAVER SLIDE DUE TO CLOSE PROXIMITY TO WELL AT BOTTOM OF BEAVER SLIDE. 15:00 - 16:00 1.00 PULL P PRE BRING BPV CREW LUBRICATOR TO THE PIPE SHED. 16:00 - 16:20 0.33 PULL P PRE PJSM FOR PULLING BPV. 16:20 - 17:55 1.58 PULL P PRE PT LUBRICATOR TO 250,4000 PSI. HOLD FOR 5 MINUTES EACH. OPEN MASTER,SSV AND SWAB VALVES. PUMP THRU BPV. APPEARS TO BE-482 PSI ON THE WELL PULL BPV BPV PULLED CLOSE THE MASTER AND BLEED PRESSURE TO THE TT PERFORM LEAK TIGHT TEST FOR 5 MIN AS PER VALVE CREW PROCEDURE FOR REMOVING LUBRICATOR 17:55 - 18:30 0.58 PULL P PRE GOOD LTT,RD&LOAD OUT VALVE CREW LUBRICATOR 18:30 - 19:45 1.25 WHIP P WEXIT MU THE INJECTOR TO THE QTS AND PT THAT CONNECTION-GOOD TEST. PERFORM CREW CHANGEOUT. LOAD BTT WHIPSTOCK TO RIG FLOOR. SPOT BLEED TRAILER Printed 10/3/2013 9:28:16AM • • North America-ALASKA-BP Page 6 of 23 Operation Summary Report Common Well Name:Z-05 AFE No Event Type:RE-ENTER-ONSHORE(RON) Start Date:9/3/2013 End Date:9/18/2013 X3-0145H-C:DRILL(3,189,228.00) Project:Prudhoe Bay Site:PB Z Pad Rig Name/No.:NORDIC 1 Spud Date/Time:7/4/1990 12:00:00AM Rig Release:9/23/2013 Rig Contractor:NORDIC CALISTA UWI: Active datum:Z-05 @92.51 usft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) — (usft) 19:45 - 20:10 0.42 WHIP P WEXIT HOLD PJSM FOR UNSTABBING INJECTOR, INSTALL&PT NIGHT CAP&BULLHEAD KILLING THE WELL. 20:10 - 20:50 0.67 WHIP P WEXIT ENSURE PROPER VALVE ALIGNMENT. POP I OFF INJECTOR AND STAND IT BACK. INSTALL NIGHT CAP&PT-GOOD TEST. 20:50 - 22:15 1.42 WHIP P WEXIT OPEN TREE VALVES TO CLOSED CHOKE& OBSERVE 340 PSI WHP. SPEAR IN W/5 BBLS MEOH. CHASE WITH 150 BBLS 2%XS KCL. INITIAL PUMP PRESSURE=420 PSI©1.7 BPM TO SPEAR IN MEOH AT 30 BBLS AWAY=1870 PSI @ 4.5 BPM AT 60 BBLS AWAY=2060 PSI @ 4.5 BPM AT 90 BBLS AWAY=2130 PSI @ 4.5 BPM AT 120 BBLS AWAY=2150 PSI @ 4.5 BPM AT 150 BBLS AWAY=2280 PSI @ 4.5 BPM ALLOW PUMP PRESSURE TO BLEED OFF. '22:15 - 23:00 0.75 WHIP P WEXIT BLEED REMAINING PRESSURE OFF THROUGH CHOKE TO TIGER TANK. PUMP FLUID ACROSS THE TOP-HOLE IS FULL. FLOWCHECK WELL-TRUCK CHARGE PUMP IS ON-ISOLATE IT. FLOWCHECK WELL-NO FLOW. PUMP ACROSS THE TOP-1 BBL TO FILL IN 20 MINUTES=LOSS RATE-3 BPH. 23:00 - 23:15 0.25 WHIP P WEXIT HOLD PJSM FOR MU WHIPSTOCK SETTING BHA. 23:15 - 00:00 0.75 WHIP P WEXIT REMOVE NIGHT CAP. FILL WELL WITH 1 BBL. MU WHIPSTOCK BHA(BHA#1) 9/11/2013 00:00 - 00:20 0.33 WHIPW P i EXIT STAB ON INJECTOR&PT QTS LOW TO 250 PSI&HIGH TO 3500 PSI-GOOD TEST. 00:20 - 00:40 I 0.33 WHIP P • i WEXIT OPEN EDC&FILL HOLE WITH 4 BBLS. FUNCTION TEST BHI TOOLS-GOOD. 00:40 - 02:30 1.83 i WHIP P WEXIT RIH W/WHIPSTOCK BHA. SET PUMP TRIPS AT 600 PSI. TAKE RETURNS THROUGH CHOKE TO TIGER TANK CIRC P 121 PSI/IA 0 PSI/OA 54 PSI/MM IN 0.33 BPM/MM OUT 0.48 BPM LOSSES WHILE TRIPPING IN HOLE=15-20 BPH. .02:30 - 03:55 1.42 WHIP P WEXIT LOG TIE IN PASS. APPLY-2.5'DEPTH CORRECTION. LOG CCLACROSS 9300'- 9815'. 03:55 - 04:20 0.42 WHIP P i WEXIT CONFIRM COLLAR DEPTHS BASED OFF CCL- COLLARS ON DEPTH. PUW=31KLBS. RIH TO SET DEPTH(9733'BOWS&9720'TOWS)& PU TO PUW. CLOSE EDC&PRESSURE UP ON SETTING TOOL. OBSERVE PINS SHEAR AT 1700 PSI. SET DOWN 4KLBS ON WHIPSTOCK TO CONFIRM SET. 04:20 - 07:30 3.17 WHIP P WEXIT PU TO 9720'&PUMP KCL AWAY. SWAP WELL TO 9.5 PPG POWERPRO MUD. 07:30 - 07:40 0.17 WHIP P WEXIT 200'FROM SURFACE,SHUT DOWN TO FLOW CHECK WELL 07:40 - 08:00 0.33 WHIP P WEXIT GOOD NO FLOW,TAG UP AND LD THE WS 'BHA 08:00 - 08:20 0.33 WHIP P WEXIT DISCUSS PLAN FORWARD WITH TOWN TEAM TO PUMP LCM BEFORE MU THE MILLING BHA 08:20 - 08:50 0.50 WHIP P WEXIT 1MU THE MILLING BHA AND DEVELOPE PLAN FORWARD TO PUMP A POLYSWELL PILL Printed 10/3/2013 9.28:16AM • North America-ALASKA-BP • ,. ' % ',Page 7 of 23 Operation Summary Report Common Well Name:Z-05 AFE No Event Type:RE-ENTER-ONSHORE(RON) Start Date:9/3/2013 End Date:9/18/2013 1X3-0145H-C:DRILL(3,189,228.00) Project:Prudhoe Bay Site:PB Z Pad Rig Name/No.:NORDIC 1 Spud Date/Time:7/4/1990 12:00:00AM Rig Release:9/23/2013 Rig Contractor:NORDIC CALISTA UWI: Active datum:Z-05©92.51 usft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth ! Phase Description of Operations (hr) (usft) 08:50 - 09:10 0.33 WHIP P WEXIT MU THE INJECTOR TO THE BHA AND TEST THE QTS 09:10 - 10:45 1.58 WHIP P WEXIT GOOD PT,RIH 10:45 - 11:00 0.25 WHIP P WEXIT LOG TIE IN 11:00 - 11:50 0.83 WHIP P WEXIT ESTABLISH LOSS RATE LOSS RATE HAS DROPPED TO 30 BPH AT 2.5 -AND 20 BPH AT 1.75 ESTABLISH INJECTIVITY PRESSURE AT 1.00 BPM 825 PSI AT 1.00 BPM 11:50 - 12:10 0.33 WHIP P WEXIT RIH TO TAG WS TAG AT 97261,PINCH POINT IS 3.7'BELOW THE TOWS 12:10 - 12:35 0.42 WHIP P WEXIT HOLD PJSM TO PUMP POLYSWELL PILL 12:35 - 12:55 0.33 WHIP P WEXIT OPEN BYPASS ON HP FILTERS AND PUMP 1 COIL VOLUME BEFORE MIXING POLYSWELL TO ENSURE WE DID NOT PUMP ANYTHING FROM THE BYPASS DOWNHOLE 12:55 - 13:00 0.08 WHIP P WEXIT PUMPED 10 BBLS OVER COIL VOLUME AND 1 PRESSURES LOOK GOOD,MIX POLYSWELL LCM PILL 13:00 - 13:40 0.67 WHIP. P WEXIT ONLINE WITH 24 BBLS OF POLYWELL IN 6% KCL POWER-VIS MUD LOST PRIME AT 2.5 BPM,SHUT DOWN AND CAUGHT PRIME,BACK ONLINE AT 2.4 BPM 4215 PSI 13:08 SWAP TO MUD FOR 5 BBLS AT 2.4 BPM AT 4220 PSI 13:10 SWAP TO 1%KCL FOR 5 BBLS AT 2.3 BPM AT 4296 PSI 13:13 POLYSWELL AT THE EDC,CLOSE THE CHOKE AND REDUCE RATE TO 2.0 BPM, PRESSURE IS SLOWLY CLIMBING UP FROM 924 PSI.CONTINUE PUMPING AT 2.0 BPM UNTIL WE GET 1/2 OF THE POLYSWELL BEHIND PIPE OR TO THE BOTTOM PERF AND THE OTHER 1/2 LEFT IN THE TUBING PRIOR TO REACHING MAXIMUM HYDRATION IN 1 HR 13:20 12 BBLS PUMPED POLYSWELL AT BOTTOM PERF,REDUCE RATE TO 1.0 BPM WHPAT 1102 PSI 13:22 14 BBLS PUMPED PAST THE WS WHP AT 1105 PSI AND STEADILY CLIMBING 13:25 15 BBLS AWAY WHP=1534 PSI 13:30 21 BBLS AWAY WHP STARTING TO STABILIZE AT 1908 PSI 13:31 OPEN CHOKE AND LAY IN THE LAST 3 BBLS AT 0.5 BPM 13:40 - 13:55 0.25 WHIP P WEXIT STOP AT 9400'AND CONTINUE CIRCULATING AT MIN RATE 13:55 - 14:05 0.17 WHIP P WEXIT 1 HR HAS PASSED SINCE WE ADDED THE FIRST SACK OF POLYSWELL,COME ONLINE TO CHECK LOSS RATE 2.0 BPM IN&OUT RATES ARE 1:1,INCREASE RATE TO 2.5 BPM AND RETURNS ARE STILL 1:1 14:05 - 14:15 0.17 WHIP P WEXIT SHUT DOWN THE PUMP AND CLOSE THE EDC TO START MILLING THE WINDOW 14:15 - 14:30 0.25 11 WHIP P WEXIT OBTAIN SPR'S Printed 10/3/2013 9:28.16AM • North America-ALASKA-BP, ? 8 g123 Operation Summary Report� � Common Well Name:Z-05 AFE No Event Type:RE-ENTER-ONSHORE(RON) Start Date:9/3/2013 I End Date:9/18/2013 X3-0145H-C:DRILL(3,189,228.00) Project:Prudhoe Bay Site:PB Z Pad Rig Name/No.:NORDIC 1 Spud Date/Time:7/4/1990 12:00:00AM Rig Release:9/23/2013 Rig Contractor:NORDIC CALISTA UWI: Active datum:Z-05 @92.51 usft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (usft) 14:30 - 15:00 0.50 STWHIP P WEXIT PU AND ESTABLISH FULL RATE,IN&OUT ti I RATES 1:1 HOLD OFF ON STARTING TO MILL THE WINDOW,WE ARE GETTING A LOT OF POLYSWELL BACK ACROSS THE SHAKER. BOTTOMS UP IS 53 BBLS BUT WE ARE GETTING IT BACK AT 27 BBLS POLYSWELL LOOKS LIKE ITS AT 100% SATURATION AND IS STLL VERY CLEAR MEANING IT ONLY ABSORBED CLEAN WATER LIKE ITS SUPPOSED TOO. 15:00 - 15:25 0.42 STWHIP P WEXIT START WORKING DOWN TO PINCH POINT LOOKS LIKE WE ARE MILLING SOMETHING ..BUT DRILL S-QE FAIRLY QUICK 15.25 - 16:30 1.08 STWHIP P WEXIT LOOKS LIKE WE ARE ON STEEL CUTTING A WINDOW. TAG PINCH POINT AT 9725. BEGIN i•-06PS" TIME MILLING WINDOW AT 1 FPH. MILL WINDOW TO 9726' 16.30 - 18:45 2.25 STWHIP P WEXIT TIME MILL WINDOW FROM 9726'. FREE SPIN 3200 PSI. CIRC P 3523/MM IN 1.7 BPM/MM OUT 1.7 BPM/MW IN 9.5 PPG/MW OUT 9.47 PPG/ WOB 2.35 KLBS/PVT 325 BBLS 18:45 - 20:10 1.42 STWHIP P WEXIT TIME MILL WINDOW FROM 9728'. FREE SPIN 3200 PSI. CIRC P 3505/MM IN 1.7 BPM/MM OUT 1.7 BPM IMWIN9.5PPG/MWOUT 9.47PPG/ WOB 1.4 KLBS/PVT 325 BBLS EACH BITE IS DRILLING OFF QUICKLY(2-3 MINUTES) MINIMAL FINE METAL SHAVINGS&A SIGNIFICANT AMOUNT OF POLYSWELL COMING ACROSS SHAKERS. START TIME MILLING AT 2 FPH AT 9729'. INCREASING ROP DID NOT MAKE ANY DIFFERENCE IN PARAMETERS. REDUCE ROP TO 1 FPH AT 9730.1'. AMOUNT OF METAL SHAVINGS ARE INCREASING AND POLYSWELL DECREASING ACROSS SHAKERS. 20:10 - 20:50 0.67 STWHIP P WEXIT TIME MILL WINDOW FROM 9730.1'. FREE SPIN 3200 PSI. CIRC P 3351/MM IN 1.68 BPM/MM OUT 1.68 BPM/MW IN 9.49 PPG/MW OUT 9.47 PPG/ WOB 0.78 KLBS/PVT 325 BBLS/VIBRATION 4 TIME MILL AT 1 FPH TO 9730.7'WHICH IS THE ESTIMATED BOTTOM OF WINDOW. 20:50 - 21:30 0.67 STWHIP P WEXIT TIME MILL FIRST FOOT OF FORMATION AT 2 FPH FROM 9730.7'TO 9731.7'. CIRC P 3350 PSI/MM IN 1.68 BPM/MM OUT 1.69 BPM/MW IN 9.49 PPG/MM OUT 9.47 PPG/WOB 0.32 KLBS/PVT 325 BBLS/ VIBRATION 4 START APPLYING INCREASED WOB. GEO CONFIRMS SHUBLIK A CUTTINGS ACROSS THE SHAKER. STILL SEE SOME POLYSWELL. Printed 10/3/2013 9:28:16AM • • North America-ALASKA-BP Page 9 of 23 Operation Summary Report «, Common Well Name:Z-05 AFE No Event Type:RE-ENTER-ONSHORE(RON) Start Date:9/3/2013 End Date:9/18/2013 X3-0145H-C:DRILL(3,189,228.00) Project:Prudhoe Bay Site:PB Z Pad Rig Name/No.:NORDIC 1 Spud Date/Time'7/4/1990 12:00.O0AM Rig Release:9/23/2013 Rig Contractor:NORDIC CALISTA UWI: Active datum:Z-05©92.51 usft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (usft) 21:30 - 00:00 2.50 STWHIP P WEXIT MILL 11'FORMATION TO 9742'. WOB= 2-3KLBS/ROP-7 FPH. REAM WINDOW UP- NO MOTORWORK OBSERVED. PUMP HI VIS SWEEP-BROUGHT BACK ABUNDANT I POLYSWELL. REAM WINDOW UP AND DOWN 2 MORE TIMES-NO WEIGHT LOSS OR MOTORWORK OBSERVED ON ANY PASSES. •WINDOW APPEARS CLEAN. DRY DRIFT j CLEAN. 9/12/2013 0000 00:10 0.17 STWHIP P WEXIT FLOWCHECK WELL-NO FLOW. • 00 10 - 02:15 2.08 STWHIP P WEXIT POOH W/WINDOW MILL ASSEMBLY. JOG BHA ONCE AT SURFACE. FLOWCHECK-NO FLOW. -t 0215 - 02:450.50 STWHIP WEXIT POP OFF INJECTOR&STAND IT BACK LD , P i WINDOW MILLING BHA. MILL&STRING +REAMER BOTH 2.74"GO/2.73"NO GO. 02:45 - 03:45 1.00 STWHIP P WEXIT 'DSM CREW TORQUE UP TREE BOLTS ABOVE 1444 MASTER VALVp:- 03 45 - 05 30 1.75 STWHIP P WEXIT DISCUSS SITUATION WITH DSM LEAD. DECISION MADE TO PRESSURE TEST TREE 'ABOVE THE MASTER. RU NIGHT CAP&FILL STACK PERFORM SHELL TEST ON TREE •LOW TO 250 PSI&HIGH TO 4500 PSI- FITTING LEAKING. CHANGEOUT FITTING& RE PRESSURE TEST-GOOD. OPEN UP WELL TO CLOSED CHOKE-NO PRESSURE. FLOWCHECK FOR 5 MINUTES-NO FLOW. POP OFF NIGHT CAP-HOLE IS FULL. 05:30 - 06:00 0.50 DRILL P PROD1 MU BUILD BHA W/2.74"X3.25"HCC BIT&2-3/8" ULS MOTOR. 06:00 - 06:15 0.25 DRILL P PROD1 PRESSURE TEST QTS LOW TO 250 PSI& HIGH TO 3500 PSI-GOOD TEST. 06.15 - 06:30 0.25 DRILL PROD1 CREW CHANGE 06:30 - 07:00 0.50 DRILL N SFAL PROD1 EDC FAILED SURFACE TEST,MU ANOTHER UPPER SETION OF THE MWD TO SWAP IT OUT 07.00 - 07:15 0.25 DRILL N SFALPROD1 ONLINE WITH PUMP TO ENSURE HOLE IS FULL WELL DID NOT TAKE ANY FLUID,SHUT DOWN PUMP TO FLOW CHECK THE WELL j HOLD PJSM TO REMOVE THE INJECTOR AND ll REPLACE THE UPPER HALF OF THE BHA 07 15 - 07:50 0.58 DRILL N SFAL PROD1 GOOD NO FLOW,PU THE INJECTOR AND _ SWAP OUT UPPER HALF 07:50 - 08:00 0.17 DRILL P PROD1 BHA MU&INJECTOR STABBED ON THE WELL,PT THE QTS 08 00 - 09:45 1.75 DRILL P PROD1 GOOD PT RIH 09:45 - 10:10 0.42 DRILL P PROD1 LOG TIE IN 10:10 - 11:30 1.33 DRILL P PROD1 CORRECT DEPTH-4.5',LOG FROM 9565'TO i -- 9744' 11:30 - 11:50 0.33 DRILL P PROD1 END LOGGING RUN TO TD PU AND CLOSE THE EDC AND OBTAIN SPR'S Printed 10/3/2013 9:28:16AM • • North America-ALASKA-BP Page 10 of 23 Operation Summary Report Common Well Name:Z-05 AFE No Event Type:RE-ENTER-ONSHORE(RON) Start Date:9/3/2013 End Date:9/18/2013 X3-0145H-C:DRILL(3,189,228.00) Project:Prudhoe Bay Site:PB Z Pad Rig Name/No.:NORDIC 1 Spud Date/Time:7/4/1990 12:00:00AM Rig Release:9/23/2013 Rig Contractor:NORDIC CALISTA UWI. Active datum:Z-05©92.51 usft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (usft) 11:50 - 14:15 2.42 DRILL P PROD1 SPR'S OBTAINED,TAG BOTTOM AND START DRILLING FREE SPIN=3190 PSI AT 1.65 BPM RATE IN=1.65 BPM RATE OUT=1.66 BPM ROP=23 FPH WOB=2.71 K CIRC PSI= 3333 PSI MW IN=9.50 PPG MW OUT=9.48 PPG ECD =10.92 PPH IAP=640 PSI OAP=71 PSI PVT=322 BBLS 14:15 - 15:00 0.75 DRILL P PROD1 CONTINUE DRILLING AHEAD FREE SPIN=3190 PSI AT 1.65 BPM RATE IN=1.65 BPM RATE OUT=1.66 BPM ROP=31 FPH WOB=3.53 K CIRC PSI= 3464 PSI MW IN=9.50 PPG MW OUT=9.47 PPG ECD =10.93 PPH IAP=713 PSI OAP=71 PSI PVT=331 BBLS PIT GAIN FROM TURNING CENTRIFUGE ON. IN&OUT MM ARE 1.7 BBLS OFF AND SHOWING A LOSS 15:00 - 15:15 0.25 DRILL N SFAL 9,820.00 PROD1 LOST COMMS TO THE TOOL,PU OFF BOTTOM&WIPE BACK TO THE WINDOW 15:15 - 15:30 0.25 DRILL N SFAL 9,820.00 PROD1 STILL NO COMMS TO THE TOOL,FLOW CHECK WELL AND POOH TO THE CASING TO CHECK THE SLB J-BOX IN THE REEL 15:30 - 15:50 0.33 DRILL N STUC 9,820.00 PROD1 AT THE WINDOW PULLED 10K OVER,TRIED GOING BACK DOWN NO MOVEMENT,CONTINUE TRYING TO WORK PIPE DOWN NO MOVEMENT,CALL DRLG SUPT AND CONTINUE CIRCULATING 15:50 - 16:40 0.83 DRILL N STUC 9,820.00 PROD1 PUMP A BOTTOMS UP AND 25 BBL HI-VIS PILL,NEED TO DUMP A FEW BBLS TO MAKE ROOM FOR THE PILL CHECK J-BOX WHILE PUMPING PILL SLB COLLECTOR IS BAD,SWAP OUT 16:40 - 17:15 0.58 DRILL N STUC 9,820.00 PROD1 COLLECTOR IS SWAPPED OUT AND THE TOOL IS WORKING TRY ORIENTING TOOL,TOOL WILL ORIENT TO THE LEFT BUT NOT THE RIGHT AND IT LOOKS LIKE ITS JUST TURNING THE BHA ABOVE 17:15 - 18:30 1.25 DRILL N STUC 9,820.00 PROD1 NOT ABLE TO MOVE UP OR DOWN,OPEN EDC AND PUMP AT MAX RATE AND PUMP A 30 BBL HI-VIS PILL WHILE DRLG SUPT MAKES HIS WAY TO LOCATION PILL DID NOT HAVE ANY INCREASE IN CUTTINGS 18:30 - 19:15 0.75 DRILL N STUC 9,820.00 PROD1 PERFORM CREW CHANGEOUT. SUPT ON LOCATION. DISCUSS OPTIONS TO FREE BHA FROM WINDOW. DISCUSS SITUATION W/ ODE ON PLAN FORWARD. Printed 10/3/2013 9:28:16AM • • North America-ALASKA-BP Page 11 of 23 Operation Summary Report Common Well Name:Z-05 AFE No Event Type:RE-ENTER-ONSHORE(RON) Start Date:9/3/2013 End Date:9/18/2013 X3-0145H-C:DRILL(3,189,228.00) L Project:Prudhoe Bay Site:PB Z Pad Rig Name/No.:NORDIC 1 Spud Date/Time:7/4/1990 12:00:00AM 1 Rig Release:9/23/2013 Rig Contractor:NORDIC CALISTA UWI: Active datum:2-05 @92.51 usft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (usft) 19:15 - 22:45 3.50 DRILL N STUC 9,820.00 PROD1 CLOSE EDC&STACK OUT WEIGHT TO 10 KLBS WOB. ATTEMPT TO ORIENT-WILL TURN RIGHT,NOT LEFT. PU TO NEUTRAL WEIGHT AND ATTEMPT TO ORIENT AGAIN- SAME RESULT.TRIED ORIENTING LEFT AND RIGHT SEVERAL TIMES. ATTEMPT PUMPING DOWN THE BACKSIDE PRESSURING UP TO 1500 PSI W/SOW TO-10KLBS. DUMP PRESSURE THROUGH SUPER CHOKE-DID NOT GAIN ANY WEIGHT. PERFORMED THIS 10 TIMES W/NO LUCK. OPEN EDC&PUMP DOWN THE COIL TO A CLOSED SUPER CHOKE. SOW=-11 KLBS. DUMP THE PRESSURE AND DO NOT OBSERVE ANY WEIGHT GAIN. PERFORMED THIS 3 TIMES W/ NO LUCK. PULL UP TO CALCULATED MAX PULL OF 44 KLBS,STACK OUT TO-10 KLBS. TRIED THIS 4 TIMES W/NO PROGRESS. DISCUSS SITUATION W/ODE-TRY ALL OPTIONS BEFORE DISCONNECTING. ONCE ALL OPTIONS ARE EXHAUSTED,ODE AGREES TO DISCONNECT. PRESSURE UP ON COIL TO A CLOSED SUPER CHOKE. PU TO 44 KLBS AND DUMP PRESSURE,TRY IT 4 TIMES-NO WEIGHT LOSS. STACK OUT TO -11 KLBS&PRESSURE UP ON COIL TO A CLOSED SUPER CHOKE-NO WEIGHT GAIN. ATTEMPT TO ORIENT HOT W/PRESSURE ON COIL AT SOW&MAX PULL-UNABLE TO ORIENT,ONLY MOVING THE STOPS INDICATING TORQUE IS BEING APPLIED TO COIL. PU TO 44 KLBS&HOLD FOR 10 MINUTES-WEIGHT INDICATOR STAYED AT 44 KLBS. LOST A TOTAL OF 7 BBLS WHILE PUMPING INTO WELL. 22:45 - 22:50 0.08 DRILL N STUC 9,820.00 PROD1 ALL TEAM MEMBERS AGREE ALL OPTIONS ARE EXHAUSTED TO FREE THE BHA AND DECIDE TO DISCONNECT FROM TOOLS. POSITION COIL TUBING TO NEUTRAL WEIGHT=27 KLBS. OPEN BAKER CHOKE. BHI DIRECTIONAL DRILLER MAKES NOTIFICATION TO HIS SUPERVISOR OF INTENT TO DISCONNECT FROM TOOLS. BHI MWD HAND SENDS COMMAND TO TOOL TO DISCONNECT. TOOLS BELOW EDC ARE DISCONNECTED AT 22:50. 22:50 - 23:15 0.42 DRILL N STUC 9,820.00 PROD1 PU&CONFIRM COIL IS FREE. PUMP A BOTTOMS UP THROUGH MGS AT 2.3 BPM. 123:15 - 23:25 0.17 DRILL N STUC 9,820.00 PROD1 FLOWCHECK WELL-NO FLOW. 123:25 - 00:00 0.58 DRILL N STUC 9,820.00 PROD1 POOH W/UPPER EDC,P&C,WEAR SUB,LQC &UQC. 9/13/2013 00:00 - 01:45 1.75 DRILL N STUC 9,820.00 PROD1 POOH W/UPPER EDC,P&C,WEAR SUB,LQC &UQC. 01:45 - 01:55 0.17 DRILL N STUC 9,820.00 PROD1 FLOWCHECK WELL-NO FLOW. 01:55 - 02:10 0.25 DRILL N STUC 9,820.00 PROD1 BUMP UP,UNSTAB&BREAK OFF TOOLS. STAND INJECTOR BACK LD UPPER EDC, P&C,WEAR SUB,LQC,UQC. 02:10 - 03:15 1.08 DRILL N STUC • 9,820.00 PROD1 PU INJECTOR,BOOT EL CABLE. STAB ON& PUMP SLACK OUT. UNSTAB&CUT OFF 194' OF EL. CUT OFF CTC&DRESS STUB. Printed 10/3/2013 9:28:16AM • • North America-ALASKA-BP Page 12 of 23 Operation Summary Report Common Well Name:Z-05 AFE No Event Type:RE-ENTER-ONSHORE(RON) Start Date:9/3/2013 End Date:9/18/2013 X3-0145H-C:DRILL(3,189,228.00) Project:Prudhoe Bay Site:PB Z Pad Rig Name/No.:NORDIC 1 Spud Date/Time:7/4/1990 12:00:00AM Rig Release:9/23/2013 Rig Contractor:NORDIC CALISTA UW: Active datum:Z-05 192.51 usft(above Mean Sea Level) Date ; From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (usft) 03:15 - 03:30 0.25 FISH N � STUC 9,820.00 PROD1 HOLD PJSM FOR PUMPING BALL&PU BTT TOOLS. 03:30 - 04:30 1.00 FISH N STUC 9,820.00 PROD1 MU BOT CTC. PULL TEST TO 35K& PRESSURE TEST TO 3500 PSI-GOOD. LOAD BTT TOOLS INTO PIPESHED. 04:30 - 05:15 0.75 FISH N STUC 9,820.00 PROD1 MU CIRC SUB&STAB ON. LOAD 5/8"DRIFT BALL IN COIL&PUMP AROUND. BALL OVER THE GOOSNECKAT 31 BBLS. POP OFF INJECTOR&LD CIRC SUB. RECOVER BALL. 05:15 - 05:25 0.17 FISH N STUC 9,820.00 PROM HOLD PJSM FOR MU BAKER FISHING BHA. 05:25 - 06:05 0.67 FISH N STUC 9,820.00 PROD1 MU BAKER FISHING BHAAS PER BTT REP. 06:05 - 06:30 0.42 FISH N STUC 9,820.00 PROD1 IPTQTS-GOOD. 06:30 - 08:45 2.25 FISH N STUC 9,820.00 I PROD1 RIH W/FISHING BHA. STOP ABOVE FISH, OBTAIN PUW=28 KLBS. CIRCULATE AT TOP OF FISH TO WASH OFF ANY DEBRIS. 08:45 - 10:30 1.75 FISH N STUC 9,820.00 PROD1 CORRECT DEPTH AS PER PREVIOUS RUNS OF-4'. STACK OUT MINIMAL WEIGHT AND ABOUT 1'INTO FISH. PU&FISH IS LATCHED. COME OFFLINE.PROCEED WITH 25 DOWN LICKS-DID NOT MOVE FISH. ATTEMPT 22 UP LICKS PULLING UP TO CLOSE TO MAX HOT PULL-DID NOT MOVE FISH. STRAIGHT PULL ON COIL TO 79.5 KLBS AND LOOKS LIKE WE ARE FREE FROM FISH. PU TO CONFIRM FREE. FLOWCHECK WELL-NO FLOW. 10:30 - 12:15 1.75 FISH N STUC 9,820.00 PROD1 POOH W/UPPER PART OF FISH&FISHING BHA. HOLD 100 PSI BACKPRESSURE ON WELL WHILE MAINTAINING RETURNS PUMPING ACROSS THE TOP. 12:15 - 12:35 0.33 FISH N STUC 9,820.00 PROD1 FLOWCHECKATSURFACE-NO FLOW. HOLD PJSM FOR LD BHA. 12:35 - 14:55 2.33 FISH N STUC 9,820.00 PROD1 I LD FISH&FISHING BHA. TOOL PARTED AT THE HOT AS EXPECTED. _ 14:55 - 15:10 0.25 WHIP N STUC 9,820.00 WEXIT HOLD PJSM TO PUMP SLACK ,15:10 - 15:50 0.67 WHIP N STUC 9,820.00 WEXIT PREP TO PUMP SLACK INTO THE REEL MUD IS STATIC IN THE WELLAND HAS NOT MOVED SINCE THE BHA WAS PULLED CLOSE THE SWAB AND REVERSE CIRC THE COIL 15:50 - 18:00 2.17 WHIP N STUC 9,820.00 WEXIT PU THE INJECTOR CUT PIPE TO FIND WIRE CUT 226',NO WIRE,MOVE INJECTOR OVER HOT TUB AND PUMP WIRE FORWARD PUMPED A COUPLE BBLS AND GOT WIRE, HEAD UP 18:00 - 18:45 0.75 WHIP N STUC 9,820.00 WEXIT MU QTS,STAB ON LUBRICATOR AND PT THE LUBRICATOR CONNECTION AND BHI FLOATS PACK OFFS ARE LEAKING,CHANGE OUT THEN RETEST 18:45 - 19:00 0.25 WHIP N STUC 9,820.00 WEXIT PT THE LUBRICATOR CONNECTION,PACK OFFS AND BHI FLOATS 19:00 - 19:45 0.75 WHIP N STUC 9,820.00 WEXIT GOOD TEST,PUMP SLACK FORWARD,POP OFF AND STAND BACK INJECTOR. 19:45 - 20:10 0.42 WHIP N STUC 9,820.00 WEXIT MU NIGHT CAP&PT. OPEN SWAB VALVE AND CHECK WELL FOR PRESSURE TO CLOSED CHOKE-NO PRESSURE. PERFORM FLOWCHECK-NO FLOW. 20:10 - 20:30 0.33 WHIP N STUC 9,820.00 WEXIT MU WHIPSTOCK SETTING BHA(#5). Printed 10/3/2013 9:28:16AM • • North America-ALASKA-BP Page 13 of 23 Operation Summary Report Common Well Name:Z-05 AFE No Event Type:RE-ENTER-ONSHORE(RON) I Start Date:9/3/2013 End Date:9/18/2013 X3-0145H-C:DRILL(3,189,228.00) Project:Prudhoe Bay Site:PBZ Pad Rig Name/No.:NORDIC 1 Spud Date/Time:7/4/1990 12:00:OOAM Rig Release:9/23/2013 Rig Contractor:NORDIC CALISTA UWI: Active datum:2-05 t 92.51 usft(above Mean Sea Level) _ Date From-To Hrs Task I Code NPT NPT Depth Phase Description of Operations (hr) (usft) 20:30 - 20:45 0.25 WHIP N STUC 9,820.00 WEXIT PRESSURE TEST QTS LOW TO 250 PSI& _ HIGH TO 3500 PSI-GOOD TESTS. 20:45 - 22:45 2.00 WHIP N STUC 9,820.00 WEXIT I RIH W/WHIPSTOCK SETTING BHA. 22:45 - 23:05 0.33 WHIP N STUC 9,820.00 WEXIT LOG TIE IN. NO CORRECTION. 23:05 - 23:20 0.25 WHIP N STUC • 9,820.00 WEXIT ORIENT TO 30°LOHS. RIW=12KLBS&PUW =29KLBS. RIH TO 9703'&PU TO 22 KLBS. • PUMPS DOWN&CLOSE EDC. PRESSURE UP 'ON COIL TO 3100 PSI&OBSERVE PINS SHEAR. SET DOWN 5 KLBS TO CONFIRM SET. 23:20 - 23:35 0.25 WHIP N STUC 9,820.00 1 WEXIT PU TO 9672.4'&PAINTAYELLOW FLAG. EOP FLAG DEPTH=9600'. PERFORM FLOWCHECK-NO FLOW. 23:35 - 00:00 0.42 WHIP N I STUC 9,820.00 WEXIT POOH W/WHIPSTOCK SETTING BHA. 9/14/2013 00:00 - 01:15 1.25 WHIP N STUC 9,820.00 WEXIT I CONTINUE POOH W/-WHIPSTOCK SETTING BHA. --4 -15 - 01:25 0.17 WHIP F' N STUC 9,820.00 WEXIT FLOWCHECK WELL-NO FLOW. 01:25 - 02:00 0.58 WHIP N STUC 9,820.00 • WEXIT BUMP UP INTO LUBRICATOR. POP OFF AND STAND INJECTOR BACK LD BHI COIL TRAK& BTT SETTING TOOLS. 02:00 - 02:20 0.33 REMCMT N STUC 9,820.00 WEXIT MU NOZZLE BHA W/NOZZLE,1 JT 2-1/16" CSH,BLIND SUB&UQC. 02:20 - 02:35 0.25 REMCMT N STUC 9,820.00 WEXIT PRESSURE TEST QTS LOW TO 250 PSI& HIGH TO 3500 PSI-GOOD TEST. 02:35 - 04:30 1.92 REMCMT N STUC 9,820.00 , WEXIT RIH W/NOZZLE BHA. CORRECT DEPTH AT EOP FLAG+3'CORRECTION. RIH&TAG ' • PINCH POINT AT 9694'. PU TO 9680'WHICH IS 10'ABOVE TOWS&PAINT A WHITE FLAG •04:30 - 07:10 2.67 REMCMT N STUC 9,820.00 WEXIT CIRCULATE MUD WHILE RECIPROCATING ACROSS 5-1/2"LINER. CIRC P 1700 PSI( _ 1.17 BPM&1:1 RETURNS. 07:10 - 09:10 2.00 REMCMT N STUC 9,820.00 WEXIT SLB ON LOCATION,HOLD PJSM WITH CMT& RIG CREWS TO RU CMT EQUIPMENT SWAP WELL TO KCL 09:10 - 09:55 0.75 REMCMT N STUC 9,820.00 WEXIT SLB RU AND PRIMING PUMPS TO PT THEIR , LINE 09:55 - 10:15 0.33 REMCMT N STUC 9,820.00 WEXIT CLOSE CHOKE AND CHECK INJECTIVITY TO 1000 PSI WELLHEAD PRESSURE SLB PRESSURE TESTING THEIR CMT LINE IAP=687 PSI OAP=83 PSI 10:15 - 11:00 0.75 REMCMT N STUC 9,820.00 WEXIT PUMP TRUCK GOT A GOOD LOW PT BUT FAILED THE HIGH FROM A LEAKING VALVE. SERVICE PUMP TRUCK VALVE AND RETEST 11:00 - 11:25 0.42 REMCMT N STUC 9,820.00 WEXIT CMT LINE IS TESTED,HOLD PJSM TO PUMP CMT 11:25 - 11:35 0.17 REMCMT N STUC 9,820.00 i WEXIT BATCH UP CMT Printed 10/3/2013 9 28:16AM North America-ALASKA-BP Page 14 of 23 Operation Summary Report Common Well Name:Z-05 AFE No Event Type:RE-ENTER-ONSHORE(RON) Start Date:9/3/2013 End Date:9/18/2013 X3-0145H-C:DRILL(3,189,228.00) Project:Prudhoe Bay Site:PB Z Pad Rig Name/No.:NORDIC 1 Spud Date/me:7/4/1990 12:00:00AM Rig Release:9/23/2013 Rig Contractor:NORDIC CALISTA UWI: Active datum:Z-05 @92.51 usft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations ` — (hr) (usft) 11:35 - 12:45 1.17 REMCMT N STUC 9,820.00 WEXIT START CMT JOB,SHUT DOWN THE PUMP AND OPEN CMT LINE TO THE REEL 11:40 ONLINE WITH 5 BBLS OF WATER AHEAD 11:45 SHUT DOWN PUMP AND BATCH UP TUB 11:46 TAG WS AND PU 1'OVER PU WT 11:50 CMT TO WT,4:39 MIN THICKENING TIME 16:29 NOT PUMPABLE 11:55 ONLINE WITH CMT 11:55 ZERO IN MM 12:07 7 BBLS PUMPED,LINE UP TO BACK FLUSH CMT LINE 12:11 CMT LINE IS CLEAN,LINE UP TO DISPLACE CMT 12:12 ONLINE WITH RIG PUMP PUMPING 5 BBLS OF 1%KCL 12:14 SWAP TO 8.7 KCL,1.5 BPM AT 1500 PSI 12:29 REDUCE PUMP RATE TO 1 BPM AT 472 PSI 12:32 ZERO OUT MM,IN&OUT RATES ARE 1:1 12:33 POOH AT 43 FPM LAYING IN CMT 12:39 CMT OUT POOH TO SAFETY AT 9100', TOC=9383' 12:45 - 13:25 0.67 REMCMT N STUC 9,820.00 : WEXIT •AT SAFETY HESITATING 1 HR GIVING CMT { •TIME TO SWAP OUT 13:25 - 13:40 0.25 REMCMT N STUC 9,820.00 I WEXIT LOAD COIL WITH CONTAM FLUID 13:40 - 13:50 0.17 REMCMT N STUC 9,820.00 WEXIT RIH TO CLEAN OUT CMT AT A 2:1 RATIO STARTING AT 9380' 13:50 - 14:05 0.25 REMCMT N STUC 9,820.00 WEXIT CLEAN OUT TO 9680'AS PER PLAN 10'ABOVE THE TOWS PU TO 9380'AND RIH CMT AT THE SHAKER AT THE CALCULATED • VOLUME FOR TOC AT 9383' 14:05 - 14:40 0.58 REMCMT N STUC 9,820.00 WEXIT POOH FROM 9680'PUMPING AT MAX RATE AT 20 FPM RIH BELOW THE TT TO MAKE SURE IT CLEAN AND POOH SLOW NOTIFY BTT TO BRING OUT WINDOW MILLING BHA 14:40 - 16:15 1.58 REMCMT N STUC 9,820.00 WEXIT CONTAMPILLOUTANDRETURNSARE CLEAN,POOH WASHING ALL MANDRELS& JEWELRY 16:15 - 16:25 0.17 REMCMT N STUC 9,820.00 WEXIT FLOW CHECK WELL 16:25 - 16:45 0.33 REMCMT N STUC 9,820.00 WEXIT GOOD NO FLOW,TAG UP AND LD THE BHA 16:45 - 17:05 0.33 REMCMT N STUC 9,820.00 WEXIT BHA OOH,TEST ELINE,GOOD TEST,MU SWIZZLE NOZZLE AND JET STACK 17:05 - 17:20 0.25 REMCMT N STUC 9,820.00 WEXIT PJSM TO REMOVE INJECTOR AND MU THE MILLING BHA 17:20 - 18:45 1.42 STWHIP N STUC , 9,820.00 WEXIT REMOVE THE INJECTOR,REMOVE THE NOZZLE AND MU THE MILLING BHA. PERFORM CREW CHANGE. PRESSURE TEST QTS-GOOD. 18:45 - 20:20 1.58 STWHIP N STUC 9,820.00 WEXIT RIH W/WINDOW MILLING BHA. TIE IN& APPLY+11'CORRECTION. 20:20 - 22:15 1.92 STWHIP N STUC 9,820.00 WEXIT WOC UNTIL WE ACHIEVE 500 PSI COMPRESSIVE STRENGTH. CIRCULATE AT 0.4 BPM 1:1 RETURNS,CIRC P 160 PSI. Printed 10/3/2013 9:28:16AM North America-ALASKA-BP Page 15 of 23 Operation Summary Report Common Well Name:Z-05 AFE No Event Type:RE-ENTER-ONSHORE(RON) Start Date:9/3/2013 End Date:9/18/2013 X3-0145H-C:DRILL(3,189,228.00) Project:Prudhoe Bay Site:PB Z Pad Rig Name/No.:NORDIC 1 Spud Date/Time:7/4/1990 12:00:00AM Rig Release:9/23/2013 Rig Contractor.NORDIC CALISTA UWI: Active datum:Z-05(4192.51 usft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (usft) 22:15 - 23:00 0.75 STWHIP N STUC 9,820.00 WEXIT CEMENT HAS REACHED 500 PSI COMPRESSIVE STRENGTH. SWAP WELL TO 'MUD. 23:00 - 00:00 1.00 STWHIP N STUC 9,820.00 WEXIT CLOSE EDC&DRY TAG AT 9694'. PU OBTAIN FREE SPIN=3040 PSI&1.65 BPM. RIH& OBSERVE MOTORWORKAT 9693.5'. BEGIN TIME MILLING WINDOW AT 1'/HR. CIRC P 3138/MM IN 1.66 BPM/MM OUT 1.67 BPM/MW IN 9.41 PPG/MW OUT 9.38 PPG/ WOB 1.0 KLBS/PVT 287 BBLS EACH BITE IS DRILLING OFF QUICKLY NO VISIBLE CEMENT OBSERVED OVER SHAKERS. ALL FINE METAL SHAVINGS. 9/15/2013 00:00 - 02 DD 2.00 STWHIP N STUC 9,820.00 WEXIT CONTINUE TIME MILLING W1NDOW FROM 9694.2'AT 1'/HR CIRC P 3270/MM IN 1.65 BPM/MM OUT 1.65 BPM/MW IN 9.42 PPG/MW OUT 9.39 PPG/ WOB 1.73 KLBS/PVT 287 BBLS TAKING LONGER TO DRILL OFF BITES. 02:00 - 04:00 2.00 STWHIP N STUC 9,820.00 WEXIT CONTINUE TIME MILLING WINDOW FROM 9696'AT 1'/HR CIRC P3270/MM IN 1.64 BPM/MM OUT 1.64 BPM/MW IN 9.41 PPG/MW OUT 9.39 PPG/ WOB 1.9 KLBS/PVT 287 BBLS BLEED OFF IA FROM 830 PSI TO 260 PSI-ALL GAS. 04:00 - 05:15 1.25 STWHIP N STUC 9,820.00 WEXIT CONTINUE TIME MILLING WINDOW FROM 9698'AT 1'/HR CIRC P 3358/MM IN 1.65 BPM/MM OUT 1.66 BPM/MW IN 9.41 PPG/MW OUT 9.39 PPG/ WOB 2.0 KLBS/PVT 288 BBLS MIX UP HI VIS SWEEP IN PIT 4. 05:15 - 06:45 1.50 STWHIP N STUC 9,820.00 WEXIT APPEARS WE HAVE EXITED AT 9699.2'. TIME MILL 1ST FOOT OF FORMATION AT 2'/HR. CONTINUE MILLING RATHOLE TO 9710'. CHECK TORQUE ON TREE BOLTS-GOOD. 06 45 - 08:45 2.00 STWHIP N STUC 9,820.00 WEXIT BACK REAM WINDOW ATV/MIN-NO MOTORWORK OBSERVED. PUMP HI VIS SWEEP. FINISH BACK REAM PASSES WITH NO ISSUES.PUMP AT 1.63 BPM WITH 3050 PSI.SHUT DOWN PUMPS AND DRY DRIFT WINDOW WITH NO WEIGHT TAKEN AND NO ISSUES.TAG UP AT 9,711'.UP WEIGHT 28K, DOWN WEIGHT 12K.PULL UP ABOVE WINDOW AND FLOW CHECK WELL-STATIC. 1 CEMENTAND FORMATION NOTED IN JSAMPLES. 08:45 - 10:15 1.50 STWHIP N STUC 9,820.00 WEXIT 1 PJSM.PULL OF OF HOLE AT 78 FPM WITH 24K UP WEIGHT.PUMP AT 2.2 BPM WITH 3385 PSI. OUT MICRO MOTION 1.9 BPM.MUD WEIGHT IN AND OUT 9.4 PPG.VOLUME 287 BBLS.IA= 315 PSI,OA=95 PSI. AT 4000'PULLING AT 104 FPM WITH 14K UP WEIGHT.PUMP AT 2.2 BPM WITH 3175 PSI, OUT MICRO MOTION 1.82 BPM.VOLUME 275 BBLS.MUD CHECK SHOWS NO SIGNIFICANT CEMENT CONTAMINATION. 10:15 - 10:30 0.25 STWHIP N STUC 9,820.00 WEXIT JOG BHA AT SURFACE BACK TO 210'.FLOW CHECK WELL-STATIC. Printed 10/3/2013 9:28.16AM 1, TREE= CIV INI3J_FEAD= FMC Z-0 5 SAFETY NOTES: ACTUATOR= AXELSON NTIAL KB_ELEV= 92.51' BF.ELEV= 55.66' KOP= 3395' 2094' —13-1/2"OTIS SSSV NP,D=2.750" Max Angle= 38°@7778' O Datum M3= 9939' --Daum ND= 8800'SS 10-3/4"CSG,45.5#, ;, ,I.I1 t' ,D=9.950" —I 2688' GAS UFT MANDRELS ST M3 I VI') DEV TYPE VLV LATCH PORT DATE 6 3096 3096 4 MERLA DM' RM 0 08/10/13 Minimum ID =2.750" @ 2094' 5 5791 5479 33 MERLA DMY RM 0 08/18/13 3-1/2" OTIS SSSV LDG NIPPLE 4 7637 6992 37 MERLA DMY RM 0 01/21/06 3 8389 7593 36 MERLA DMY RA 0 07/09/90 2 9014 8106 34 MERLA DMY RA 0 07/09/90 1 9292 8340 33 I LRLA DMY RM 0 01/21/06 ' r [ 9322' -]3-1/2"PARKER SWS NP,D=2.750" • � 932W —I RIGHT-HA ND RIiEASE LATCH X Z) 9330' H 7-5/8"x 3-1/2"TNV HBBP PKR,D=3.0" II 11 9349' H 3-1/2"PARKER SWS NP,ID=2.750" I Ir-1 9370' -13-1/2"PARKER SWS NP,D=2.750" 3-1/2"TBG,92#,L-80,.0087 bpf,D=2.992" — 9381' zr 9389' H5-1/2"BKR SEAL ASSY W/O SEALS,D=4.903" 7-5/8"CSG,29.7#,I•f:i`t HOWCO,NSCC,D=6.875" H 9678' 9381' H ELMO Tr LOGGED 09/08/90 \LT ; 9391' H 7-5/8"X 5-1/2"LNR HGR,ID=? PERFORATION SUMMARY ---- 9694' H 5-1/7 WHPSTOCK(09/13/13) REF LOG:BRCS ON 07/18/90 ANGLE AT TOP PERF:30°@9892'07/18/90 '---................... 9726'9726' 51/2"WFPSTOCK(09/10113) Note:Refer to Production DB for historical pert data 9764' 5-1/2"MARKER JONT SIZE SPF T NTERVAL Opn/Sqz SHOT SOZ10109' H SCALE/FORMATION SAND(TAGGED 02/17/13) 2" 4 9892-9910 0 07/12/08 2" 4 9910-9930 0 07/12/08 ? -j RSH-2 BP PACKNG B_EuUJTS(07/19/04) 2-1/8" 4 9942-9958 0 07/18/90 ? H OTIS BW PRONG 2" 4 9942-9958 0 07/12/08 4" 4 9968-9984 0 07/18/90 10111' H5-1/2"X 3-1/2"TIW SS-MS PKR,D=3.20" 2" 4 9968-9984 0 07/12/08 I 2" 4 9994-10012 0 07/12/08 4" 4 9994 10012 0 07/18/90 ' ' 10116' H 3-1/2"PARKER SWS NP,D=2.750" 4" 4 10022-10076 0 07/18/90 4" 4 10088-10110 (. 07/18/90 ' 10119' H3-1/2"PARKER SWS NP,D=2.750" 4" 4 10126-10150 :: 07/18/90 / 10121' H3-1/2"1/1EG,D=2.990" I 10131' H ELMD TT LOGGED 09/08/90 .1.1.1.1.'*'*'4 PBTD —I 'i ONO' ��1�•�•�•�•�•A 5-1/2"LNR,17#,N-80 FL4S,.0232 bpf,D=4.892" —1 10300' DATE REV BY CONSENTS DATE REV BY COMMENTS PRUJDHOE BAY UNT 07/09/90 PGS ORIGINAL COMPLETION 05/14/13 CNJ/JMD GLV C/O(05/03/13) WELL: Z-05 06/16/01 _ RN/TP CORRECTIONS 05/26/13 PJC PBRF CORRECTION PERMIT No:'1900780 03/21/10 JLW/SV CSG&MSC CORRECTIONS 08/27/13 RKT/JMD GLV CIO(08/10/13) AR No: 50-029-22056-00 02/25/13 JMD SCHEMATIC REVEW PRE RIG SEC 19,T11 R R12E 975'FNL&3930'FEL 03/01/13 DLW/JND GLV CIO(02/20/13) 04/03/13 KAUJMD PERF CORR/TAG SCALE(2/17/13) BP Exploration(Alaska) ~ ~ BP Exploration (Alaska) Inc. Attn: Well Integrity Coordinator, PRB-20 Post Office Box 196612 Anchorage, Alaska 99519-6612 ~'~~ ~ `''~~~,~ ~ ~ `}~rir, ~ f~~~$P ~x ~a ~, lt.,~ ~('_L>k, 4 A M 1~.__k ' August 14, 2009 Mr. Tom Maunder Alaska Oil and Gas Conservation Commission 333 West 7th Avenue Anchorage, Alaska 99501 Subject: Corrosion Inhibitor Treatments of GPB Z-Pad Dear Mr. Maunder, bp ~~~~~~~~ ocT o ~ 2oas ~las~C~ ~ii ~ Gas Cons. Corr~niRRipn Anchoraq~ p-~ ~ ~9 ~ ~,"` Qs Enclosed please find multiple copies of a spreadsheet with a list of wells from GPB Z- Pad that were treated with corrosion inhibitor in the surface casing by conductor annulus. The corrosion inhibitor is engineered to prevent water from entering the annular space and causing external corrosion that could result in a surface casing leak to atmosphere. The attached spreadsheet represents the well name, API and PTD numbers, top of cement depth prior to filling and volumes of corrosion inhibitor used in each conductor. As per previous agreement with the AOGCC, this letter and spreadsheet serve as notification that the treatments took place and meet the requirements of form 10-404, Report of Sundry Operations. If you require any additional information, please contact me or my alternate, Anna Dube, at 659-5102. Sincerely, Torin Roschinger BPXA, Well Integrity Coordinator ~ ~ BP Exploration (Alaska ) Inc. Surface Casing by Conductor Annulus Cement, Corrosion inhibitor, Sealant Top-off Report of Sundry Operations (10-404) Date Z-Pad 8/13/2009 Well Name PTD # API # Initial top of cement Vol. of cement um ed Final top of cement Cement top off date Corrosion inhibitor Corrosion inhibitor/ sealant date ft bbls ft na al Z-01 B 2081080 50029218300200 NA 0.2 NA 3.40 7/24/2009 Z-02A 1960430 50029218140100 NA 0.4 NA 3.40 7/24/2009 Z-03 1971310 50029227870000 NA 1.3 NA 11.90 7/24/2009 Z-04A 2042300 500292i990Q100 NA 1.5 NA 14.50 7/24/2009 Z-05 1900780 50029220560000 NA 1 NA 8.50 7/24/2009 Z-06 1880320 50029217980000 NA 0.1 NA 1.70 7/24/2009 Z-07A 1931100 50029220460100 NA 2 NA 17.00 7/24/2009 Z-08A 1931280 50029217870100 NA 02 NA 2.55 7/24/2009 Z-09A 2081410 50029219670t00 NA 0.2 NA 1.70 7/24/2009 Z-10 1891160 500292t9860000 NA 1.3 NA 11.t0 7/24/2009 Z-11A 2050310 50029220530100 NA 02 NA 1.70 7/26/2009 Z-12 1891020 50029219770000 NA 1.2 NA 8.50 7/26/2009 Z-13A 2042030 50029220690100 NA 3.6 NA 24.66 7/26/2009 Z-146 2060990 50029218440200 NA 02 NA 1.70 7/26/2009 Z-t5 1880880 50029218490000 NA 0.2 NA 1.70 7/26/2009 Z-is 1920120 50029222450000 NA 0.3 NA 2.55 7/26/2009 Z-17 1891390 50029220010000 NA 3.7 NA 34.00 7/26/2009 Z-18 1890960 50029219710000 NA 02 NA 1.70 7/26/2009 Z-19A 2061050 50029222510100 NA 0.2 NA 1.70 7/26/2009 Z-20 1881000 5002921859~00 NA 0.2 NA 1.70 7/26/2009 Z-21 A 2001010 50029219380100 NA 0.2 NA 1.70 7/23/2009 Z-22B 1960350 50029220370200 NA 0.5 NA 5.10 7/23/2009 Z-23B 2041080 50029219500200 NA 0.3 NA 1.70 7/23/2009 Z-24 1890180 50029219t70000 NA 0.3 NA 2.55 7/23/2009 Z-25 1881590 50029219020000 NA 0.2 NA 1.70 7/23/2009 z-2sa 2080790 500292i9450100 NA 0.3 NA 3.40 7i23~2oos Z-27 1900310 50029220220000 NA 0.2 NA 2.55 7/25/2009 Z-28 1881270 50029218790000 NA 0.2 NA 1.70 7/25/2009 Z-29 1890650 50029219540000 NA 0.2 NA 1.70 7/25/2009 Z-30A 2032190 50029220130100 NA 0.2 NA 3.40 7/25/2009 Z-31 1881120 50029218710000 NA 0.3 NA 3.40 7/26/2009 Z32BL1 1970350 50029219246000 NA 0.2 NA 1.70 7/25/2009 Z-33A 1890050 50029218950100 NA 0.5 NA 3.40 8/8/2009 Z-35 1980930 50029228840000 NA 1.3 NA 11.50 7/4/2009 Z-38 1980600 50029228730000 NA 1.2 NA 11.90 7/26/2009 Z-39A 2042240 50029229950100 NA 3.8 NA 39.90 7/25/2009 Z-46A 2052030 50029232800100 NA 1.7 NA 13.60 7/26/2009 Z-100 2031710 50029231820000 NA 5 NA 45.90 7/23/2009 Z-101 2001620 50029229780000 NA 1 NA 10.20 7/23/2009 Z-102 2070500 50029233530000 NA 1.5 NA 15.30 7/25/2009 Z-103 2042290 50029232350000 NA 1.5 NA 10.20 7/25/2009 Z-1o8 2052010 50029232920000 NA 1.5 NA 11.90 7/24/2009 Z-112 2071720 5002923380000o NA surtace NA ',,' ~° ~ ~ STATE OF ALASKA®~''~~ ~''°~ ALA OIL AND GAS CONSERVATION COM~ION I +? REPORT OF SUNDRY WELL OPERATIONS °`~~ ~ 2008 -, . , _. 1. Operations Abandon ~ Repair Well ~ Plug Perforations ~ Stimulated Otf12r "' , ~Ot~f~ Performed: Alter Casing ~ Pull Tubing Perforate New Pool ~ Waiver ~ Time Extension / , Change Approved Program ~ Operat. Shutdown ~ Perforate Q - Re-enter Suspended Well 2. Operator BP Exploration (Alaska), Inc. 4. Current Well Class: 5. Permit to Drill Number: Name: Development I~' - Exploratory '. 19o-o7so 3. Address: P.O. Box 196612 Stratigraphic S@rVICe ~ 6. API Number: Anchorage, AK 99519-6612 50-029-22056-00-00 ~ 7. KB Elevation (ft): 9. Well Name and Number: 92.51 KB PBU Z-05 ' 8. Property Designation: 10. Field/Pool(s): _ ADLO-028245 - PRUDHOE BAY Field/ PRUDHOE OIL Pool 11. Present Well Condition Summary: Total Depth measured 10300 - feet Plugs (measured) 10101' true vertical 9189.91 feet Junk (measured) None Effective Depth measured 9353 feet true vertical 8392 feet Casing Length Size MD TVD Burst Collapse CONDUCTOR 70 20" 91.5# H-40 39 - 109 39 - 109 1490 470 SURFACE 2649 10-3/4" 45.5# L-80 38 - 2687 38 - 2687 5210 2480 PRODUCTION 9640 7-5/8" 29.7# L-80 38 - 9678 38 - 8667 6890 4790 LINER 916 5-1/2" 17# L-80 9381 - 10297 8416 - 9188 7740 6280 LINER 10 3-1/2" 9.3# L-80 10111 - 10121 9037 - 9045 10160 10530 Perforation depth: Measured depth: SEE ATTACHED - _ _ _ True Vertical depth: _ _ _ _ Tubing: (size, grade, and measured depth) 3-1/2" 9.3# L-80 34 - 9389 0 0 - Packers and SSSV (type and measured depth) 3-1/2" Baker HB Packer 9330 3-1/2" TIW Packer 10111 0 0 0 0 12. Stimulation or cement squeeze summary: Intervals treated (measured): ,f~h1 f{1~rntQQ Treatment descriptions including volumes used and final pressure: ~~~"'~~~~~ ~~~., e~. ~ 2UUU 13. Representative Daily Average Production or Injection Data Oil-Bbl Gas-Mcf Water-Bbl Casing Pressure Tubing pressure Prior to well operation: 63 2508 1894 302 Subsequent to operation: SHUT-IN 14. Attachments: 15. Well Class after proposed work: Copies of Logs and Surveys Run Exploratory Development ~ Service Daily Report of Well Operations X 16. Well Status after proposed work: Oil ~' Gas WAG 1, GINJ WINJ WDSPL 17. I hereby certify that the foregoing is true and correct to the best of my knowledge. Sundry Number or N/A if C.O. Exempt: N/A Contact Gary Preble Printed Name Gary Prebl Title Data Management Engineer Signature Phone 564-4944 Date 7/15/2008 SSiC Form 10-404 Revised 04/2006 `' ~+ ~ ~ /~ ~ ~.S S SF~ JUL 2 9 20D8 Submit Original Only Z-05 190-0780 PERF ~TT~f`HMFNT • Sw Name Operation Date Perf Operation Code Meas Depth Top Meas Depth Base Tvd Depth Top Tvd Depth Base Z-05 7/24/90 PER 9,968. 9,984. 8,917.71 8,931.3 Z-05 7/24/90 PER 9,994. 10,012. _ 8,939.76 8,954.94 Z-05 7/24/90 PER 10,022. 10,076. 8,963.34 9,008.37 Z-05 7/24/90 PER 10,088. 10,110. 9,018.29 9,036.37 Z-05 7/24/90 PER 10,126. 10,150. 9,049.43 9,068.91 Z-05 8/18/93 APF 9,942. 9,958. 8,895.51 8,909.19 Z-05 1/13/05 FIL 10,101. 10,150. 9,028.99 9,068.91 Z-05 7/11/08 APF 9,968. 9,984. 8,917.71 _ 8,931.3 Z-05 7/11/08 APF 9,994. 10,012. 8,939.76 8,954.94 Z-05 7/12/08 APF 9,892. 9,930. 8,852.43 8,885.21 Z-05 7/12/08 APF 9,942. 9,958. 8,895.51 8,909.19 AB ABANDONED PER PERF APF ADD PERF RPF REPERF BPP BRIDGE PLUG P ULLED SL SLOTTED LINER BPS BRIDGE PLUG SET SPR SAND PLUG REMO VED _ FCO FILL CLEAN OUT SPS SAND PLUG SET FIL FILL SQF SQUEEZE FAILED MIR MECHANICAL ISOLATED REMOVED SQZ SQUEEZE MIS MECHANICAL ISOLATED STC STRADDLE PACK, CLOSED MLK MECHANICAL LEAK STO STRADDLE PACK, OPEN OH OPEN HOLE • • Z-05 DESCRIPTION OF WORK COMPLETED NRWO OPERATIONS EVENT SUMMARY ~ACTIVITYDATE SUMMARY 7/11/2008 WELL FLOWING ON ARRIVAL. T/I/O 300/1420/440. RU ELINE FOR ', PRODUCTION PROFILE W/DEFT AND GAS LIFT SURVEY. MAJORITY OF ', LIFT OBSERVED FROM STATION AT 5791 FT. CURRENT PRODUCTION i DATA: 1350 BFPD, 30 BOPD, 1.316 MMSCF TOTAL GAS, 1.09 MMS F PASSES FROM 9850' - 10095 (TD). VERY LITTLE FLOW SEEN IN 5.5" CSG. FIELD SPLITS: 8% FROM 10088'-10110', 72% FROM 10022'-10076', 14% FROM 9994'-10012', 6% FROM 9968'-9984'. _NO CONTRIBUTION FROM UPPERMOST PERFORATION INTERVAL. STOP COUNTS TAKEN IN BETWEEN EACH PERF ZONE (9935', 9962', 9990', 10017', 10079', 10089'). 2" PJ OMEGA PERFORATING GUNS PERFORATE INTERVALS: 9994'- ~10012' AND 9968-9984 FT. WELL FLOWING, UNDERBALANCE WHILE +SHOOTING. *""JOB IN PROGRES AND CONTINUED ON 12-JUL-2008 WSR*** 7/12/2008'T/I/O = 240/1050/250. Temp = SI. Bleed OAP to common line (Eval high ,OAP). A/L Cc~ 1720 psi & SI @ casing valve. Initial OA FL near surface. No need to bleed OAP. Monitored for 30 minutes. Final WHPs = 240/1050/250. ____ ** *** EGAJETS, 4 SPF, 7/12/2008 CONTINUED FROM 11-JUL-2008 2 HSD OM PERFORATE 9942-9958 AND 9892-9930 FT IN 3 RUNS. ALL PERFORATIONS PERFORMED UNDERBALANCE WITH WELL FLOWING AND CHOKE SET AT 44 STEPS, WHP 200 PSI, ~ 200 PSI UNDERBALANCED. GUNS CAME BACK CLEAN AFTER EACH RUN. :WELL LEFT SHUT IN T/I/0=200/1200/250. GAS LIFT SHUT IN, DSO ',NOTIFIED TO COME TO WELLSITE AND BRING BACK ONLINE. '"""JOB COMPLETED`** FLUIDS PUMPED BBLS 1 diesel 1 Total 07/16/08 Schlumberger Alaska Data & Consulting Services 2525 Gambell Street, Suite 400 Anchorage, AK 99503-2838 ATTN: Beth N0.4783 Company: State of Alaska Alaska Oil & Gas Cons Comm Attn: Christine Mahnken 333 West 7th Ave, Suite 100 Anchorage, AK 99501 of f`wlwr rr\ Well 01-14 JOO it 12017504 PRODUCTION PROFILE --'° 07/14/08 -- 1 1 Z-05 12017503 PRODUCTION PROFILE 07/11/08 1 Z-24 12017503 PRODUCTION PROFILE 07/12/08 1 1 05-08 11999026 USIT CEMENT EVALUATION J 07/13/08 1 1 N-12 12057614 _, USIT CEMENT & CORROSION _, 06/28/08 1 1 N-12 12057614 USIT COMPOSITE '7} - L 06/28/08 1 1 WB-04 12021165 MEM SBHPS 06/12/08 1 1 L3-05 11982436 RST ~ -~ 06/01/08 1 1 J-17C 12066523 MCNL 05/23/08 1 1 NLtASt AGRIVUWLCUUC FICI.Gr 1 or arurvnva ruw n~~ ~n~.n..a ....~ ..... ........•. •..• BP Exploration (Alaska) Inc. Petrotechnical Data Center LR2-1 900 E. Benson Blvd. i Anchorage, Alaska 99508 Date Delivered: ~' Alaska Data & Consulting Services 2525 Gambell Street, Suite 0 Anchorage, AK 9 3-28 / ATTN: Beth Received by: • ~~ ) STATE OF ALASKA ) ALASKA OIL AND GAS CONSERVATION COMMISSION REPORT OF SUNDRY WELL OPERATI0fJSl8 2005 1. Operations Performed: Abandon 0 Alter Casing D Change Approved Program D RepairWellD PluQ PerforationsD Pull TubingD Perforate New Pool 0 Operation Shutdown 0 Perforate 0 .:1\ :t ^~ 8.:~ ~:f.':~ StimulattOO';tl/., WaiverD 2. Operator Name: 3. Address: 4. Current Well Class: Development ŒJ Stratigraphic 0 9. Well Name and Number: Z-05 10. Field/Pool(s): Prudhoe Bay Field I Prudhoe Oil Pool BP Exploration (Alaska), Inc. P.O. Box 196612 Anchorage, Ak 99519-6612 7. KB Elevation (ft): ExploratoryD ServiceD 92.51 8. Property Designation: ADL-0028245 11. Present Well Condition Summary: Total Depth measured '10300 feet true vertical 9189.9 feet Plugs (measured) Junk (measured) Effective Depth measured 9353 feet true vertical 8392.1 feet Casing Length Size CONDUCTOR 70 20" 91.5# H-40 LINER 916 5-1/2" 17# L-80 LINER 10 3-1/2" 9.3# L-80 PRODUCTION 9640 7-5/8" 29.7# L-80 SURFACE 2649 10-3/4" 45.5# L-80 MD TVD 39 109 39.0 - 109.0 9381 - 10297 8415.6 - 9187.5 10111 - 10121 9037.2 - 9045.4 38 - 9678 38.0 - 8666.9 38 - 2687 38.0 - 2687.0 Measured depth: 9942 - 9958, 9968 - 9984, 9994 - 10012, 10022 - 10076, 10088 - 10110, 10126 - 10150 Co. ns, Commission I'. OtherU Jlm;hi!)H1ge D Time EXtension Re-enter Suspended WellD 5. Permit to Drill Number: 190-0780 6. API Number 50-029-22056-00-00 9353 None Burst 1490 7740 10160 6890 5210 Collapse 470 6280 10530 4790 2480 True vertical depth: 8895.51 - 8909.19,8917.71 - 8931.3,8939.76 - 8954.94,8963.34 - 9008.37, 9018.29 - 9036.37,9049.43 - 9068.91 Tubing (size, grade, and measured depth): 3-1/2 Inch 9.3 Lb L-80 @ 34 9389 Packers & SSSV (type & measured depth): 3-1/2" Baker HB Packer 3-1/2" TIW Packer @ 9330 @ 10111 SCANNED FEB 22 ZOCS 12. Stimulation or cement squeeze summary: Intervals treated (measured): 9900' -10101' Treatment descriptions including volumes used and final pressure: 72 Bbls 12% DAD Acid @ 2101 psig Representative Daily Average Production or Injection Data Gas-Met Water-Bbl Casing Pressure 0.7 82 150 0.2 1251 1348 13. Prior to well operation: Subsequent to operation: Oil-Bbl 125 98 14. Attachments: 15. Well Class after proposed work: ExploratoryD 16. Well Status after proposed work: OilŒ] GasD Copies of Logs and Surveys run - Daily Report of Well Operations - ! 17. I hereby certify that the foregoing is true and correct to the best of my knowledge. Contact Garry Catron Printed Name Garry Catron tJ~ C~ Tubing Pressure 318 303 DevelopmentŒ) ServiceD WAG D GINJD WINJD WDSPLD Prepared by Garry Catron (907) 564-4657. Sundry Number or N/A if C.O. Exempt: N/A Phone 564-4657 Production Technical Assistant Title Signature Form 10-404 Revised 4/2004 ORIGi~~AL Date 2/14/05 'tuUM3 Drl Æ8 1 ~ LUU~ ) ) Z-05 DESCRIPTION OF WORK COMPLETED NRWO OPERATIONS EVENT SUMMARY 01/13/05 RIH WI MOTOR & 2.6" MILL. TAGGED PREVIOUSLY NOTED POTENTIAL COLLAPSED TBG AT 93071 (CTM). POOH. MUIRIH WI MOTOR AND 2.3'1 MILL. TAG AT 10,0581. MILL TO 10,0941. HARD STALL 5 TIMES. PU WT = 25 KLBS. APPROX 7 KLBS OVER NORMAL. MAY BE TAGGING LOST SSSV PRONG. POOH. MU RIH WI 211 JET SWIRL NOZZLE. JET STAGE 1 - 25 BBLS OF 12% DAD ACID FROM 10060 TO FINAL TAG OF 100971 AND UP TO 99001. SOAK 20 MINIS. JET STAGE 2 - 25 BBLS OF 12% DAD FROM 100951-99001. SOAK 20 MINIS. JET STAGE 3 - 22 BBLS OF 120/0 DAD ACID FROM FINAL TAG OF 101011 UP TO 99001. PUMP 50 BBLS OVERFLUSH OF KCL. POST INJECTIVITY = 1230 PSI WHP @ 1.6 BPM DOWN COIL. POOH. FLUIDS PUMPED BBLS 152 528 175 25 72 952 Methonal/W ater 1 % XS KCL KCL Crude 120/0 DAD Acid TOTAL Page 1 lREE = dIÞ CfIN WELLHEAD = FMC ÄëTUAfoFf;^"""'.AXELSÕN 'kä: ELEV';"""''''' ".... ~. 95.5'1" B¡:-'-ÊCE\/;~^--'~^^-'-"55:66" KóÞ ~ .... "'"''"'''339~f ~~~!;~~~~N~=~"::^~~,~"~~r!!!~~. Datum MD = 9938' "Dafurñ'iVD~~'"'"'"'ãäööÎsS ) Z-05 SAl') NOTES: 8 2094' 1-13-1/2" OTIS SSSV NIP, ID = 2.750" 1 110-3/4" CSG, 45.5#, L-80, ID = 9.953" 1-1 2688' I..J ~ Minimum ID = 2.750" @ 2094' 3.1/2" OTIS SSSV LDG NIPPLE L GAS LIFT MANDRELS ST MD rvD DEV TYÆ VLV LATCH 6 3096 3003 4 MERLA DOME RM 5 5791 5386 33 MERLA DOME RM 4 7637 6899 36 MERLA DOME RM 3 8389 7501 36 MERLA DMY RA 2 9014 8014 34 MERLA DMY RA 1 9292 8248 32 MERLA SO RM PORT DATE 16 07/19/04 16 07/19/04 16 07/19/04 0 0 20 07/19/04 I I :8: ~ 9322' 1-13-1/2" PARKER SWS NIP, ID = 2.750" 1 9329' 1-1 RIGHT-HAND RELEASE LATCH 1 9330' 1-17-5/8" x 3-1/2" TfIN HBBP PKR, ID = 3.0" 1 t J 9349' 1-13-1/2" PARKER SWS NIP, ID = 2.750" 1 9370' 1-13-1/2" PARKER SWS NIP, ID = 2.750" 1 13-1/2"TBG, 9.2#, L-80, .0087 bpf, ID=2.992" 1-1 9381' ( I TOP OF 5-1/2" LNR 1-1 9383' 1 ;I 17-5/8" CSG, 29.7#, ID = 6.875" 1-1 9678' ~ ,,~ \~ "0 I I . - ~. -0 ~ 10101' CTM 1-1 SAND TOP (01/13/05) 1 ~ 1 UNKNOWN 1-1 OTIS BP\! PRONG 1 ~ ~ I 10111' 1-I5-1/2"X3-1/2"TflNSS-MSPKR, ID=3.20" 1 9381' 1-15-1/2" BAKER SEAL ASSY W/O SEALS, ID = 4.903" 1 9381' 1-1 ELMD TT LOGGED 09/08/90 1 111 1-1 FISH - 2 IBP PACKING ELEMENTS 1 9755' 1-1 MARKER JOINT 1 ÆRFORA TION SUMMARY REF LOG: BHCS ON 07/18/90 ANGLEATTOPÆRF: 31 @ 9942' Note: Refer to Production DB for historical perf data SIZE SPF INTERV AL Opn/Sqz DA TE 2-1/8" 4 9942 - 9958 0 07/18/90 4" 4 9968 - 9984 0 07/18/90 4" 4 9994 - 10012 0 07/18/90 4" 4 10022 - 10076 0 07/18/90 4" 4 10088 - 10110 0 07/18/90 4" 4 10126 - 10150 0 07/18/90 , ~ I 10116' 1-13-1/2" PARKER SWS NIP, ID = 2.750" 1 I 1 0119' 1-13-1/2" PARKER SWS NIP, ID = 2.750" 1 I 10121' l-i 3-1/2" WLEG, ID = 2.990" I I 10131' 1-1 ELMD TT LOGGED 09/08/90 1 I PBTD 1-1 10210' ~ 15-112" LNR, 17#. L-80, .0232 bpf, ID = 4.892" 1-1 10300' DA TE REV BY COMMENTS 07/09/90 PGS ORIGINAL COM PLETION 06/16/01 RN/TP CORRECTIONS 10/29/03 KCFfTlH SAND DEPTH CORRECTION 12/05/03 DA V fTlP GLM LATCH CORRECTIONS 12/20/03 KBfTLH SET IBP 07/19/04 DAV/KAK GLV C/O; PULL IBP; FISH DA TE REV BY COMMENTS 02/08/05 DBM'TLH FCO SAND PLUG (01/13/05) PRUDHOE BAY UNIT WELL: Z-05 ÆRMIT No: 1900780 APt No: 50-029-22056-00 SEe 19, T11 N, R12E, 975' FNL & 3930' FEL BP Exploration (Alas ka) / I ~ þ_OS- 02/03/05 '--'" / V Schlumberger NO. 3327 Alaska Data & Consulting Services 2525 Gambell Street, Suite 400 Anchorage, AK 99503-2838 ATTN: Beth SCANNED JUN 1 Wi 2005 Company: State of Alaska Alaska Oil & Gas Cons Comm Attn: Helen Warman 333 West 7th Ave, Suite 100 Anchorage, AK 99501 Field: Prudhoe Bay Color Well Job # Log Description Date Blue line Prints CD ,-/ /'Î;; -- cfiJ E-36 10679044 RST 12/25/03 1 1 ;9.:;....oEz-05 10679035 RST 11/28/03 1 1 803 ~C¡tfC¡R-13 10772272 RST 06/06/04 1 1 '/3- Ie 7 02-07 A 10772244 RST 04/07/04 1 1 J:A!. Jt 3 N-01A 10877782 RST 08/27/04 1 1 ~1...cú.~1 L5-05 10679070 RST 04/05/04 1 1 ì :~ ¡t/T F-27 10662946 RST 09/13/03 1 1 . ~ . 10563157 RST 05/13/03 1 1 L- C~1 D.S.06-14A : ~-. ¿1'!J 0.5. 02-27 A 10772247 RST 04/10/04 1 1 / 'j- ' 10687697 RST 07/20/04 1 1 ¡cgJ-¡2) 0.5.03-22 [,2 - C'r5 E-08A 10728384 MCNL 01/01/04 1 1 :Jtf ;;:J - E-19A 10678042 RST 12/21/03 1 1 ¡ -,...,¡ 10728385 MCNL 01/03/04 1 1 ,'Îr:.~/,,2. 'D C-08A ïj '..-' -- PLEASE ACKNOWLEDGE RECEIPT BY SIGNING AND RETURNING ONE COPY EACH TO: BP Exploration (Alaska) Inc. Petrotechnical Data Center LR2-1 900 E. Benson Blvd. Anchorage. Alaska 99508 Date Delivered: í ;:<Þ51o~ / ¡ I Alaska Data & Consulting Services 2525 Gambell Str. eet.... SU.ite 400 .' tL Anchorage, AK 995.,~3_283¡'8 ATTN: B~ fL' !í /. ~ Rec-~d by: ¡; r. . / ' ~~ "C':' 'I f r'\ "'" STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMMISSION REPORT OF SUNDRY WELL OPERATIONS 1. Operations Performed: AbandonD Alter Casing D Change Approved Program D 2. Operator SuspendD RepairWeliD Pull TubingD Operation ShutdownD Plug PerforationsD Perforate New Pool D 4. Current Well Class: Perforate D WaiverD Stimulate ŒI Time ExtensionO Re-enter Suspended Well 0 5. Permit to Drill Number: 190-0780 OtherD Name: BP Exploration (Alaska), Inc. Development I]] StratigraphicD 9. Well Name and Number: Z-o5 10. Field/Pool(s): Prudhoe Bay Field 1 Prudhoe Oil Pool ExploratoryD ServiceD 6. API Number 50-029-22056-00-00 3. Address: P.O. Box 196612 Anchorage, Ak 99519.6612 7. KB Elevation (ft): 92.51 8. Property Designation: ADL-0028245 11. Present Well Condition Summary: Total Depth measured 10300 feet true vertical 9189.9 feet Effective Depth measured 10210 feet true vertical 9117.3 feet Plugs (measured) Junk (measured) None None Casing Length Sjze MD TVD Burst Collapse Conductor 70 20" 91.5# H-40 39 109 39.0 - 109.0 1490 470 Liner 916 5-1/2" 17# L-80 9381 - 10297 8415.6 - 9187.5 7740 6820 Liner 10 3-112" 9.3# L-80 10111 - 10121 9037.2 - 9045.4 10160 10530 Production 9640 7-5/8" 29.7# L-80 38 - 9678 38.0 - 8666.9 6890 4790 Surface 2649 10-3/4" 45.5# L-80 38 - 2687 38.0 - 2687.0 5210 2480 Perforation depth: Measured depth: 9942 - 9958,9968 - 9984, 9994 -10012,10022 -10076,10088 -10110,10126 -10150 True vertical depth: 8895.51 - 8909.19, 8917.71 - 8931.3, 8939.76 - 8954.94,8963.34 - 9008.37, 9018.29 - 9036.3~~C.43 -E9o~,~9;E Tubing ( size, grade. and measured depth): 3-1/2" 9.3# L-80 @ 34 - 9389 r(1: V j D Packers & SSSV (type & measured depth): 3-1/2" Baker HB Packer 3-1/2" TIW Packer @ 9330 @ 10111 FEBl 92004 Ala8ra on & Gas Cons. Commleeton Anchorage 12. Stimulation or cement squeeze summary: Intervals treated (measured): Treatment descriptions including volumes used and final pressure: Prior to well operation: Subsequent to operation: Oil-Bbl 115 Representative Daily Average Production or Injection Data Gas-Met Water-Bbl Casing Pressure 0.35 50 760 Tubing Pressure 320 13 118 0.97 134 1987 332 14. Attachments: 15. Well Class after proposed work: ExploratoryD Development ŒI ServiceD Copies of Logs and Surveys run - 16. Well Status after proposed work: Operational Shutdown 0 Oil I]] GasD WAG D GINJD WINJD WDSPLD Prepared by Garry Catron (907) 564-4657. SUndry Number or NIA if C.O. Exempt: N/A Daily Report of Well Operations. ! 17. I hereby certify that the foregoing is true and correct to the best of my knowledge. Garry Catron Printed Name Garry Catron ~ Crk-. SCANNED MAR 1 6 2004 Form 10-404 Revised 12/2003 Contact Title Production Technical Assistant Signature Phone 564-4657 Date 2/17104 R8DMS 8Fl ÆB 2U *' ¡"'\ ~ I-OS DESCRIPTION OF WORK COMPLETED NRWO OPERATIONS EVENT SUMMARY 10/14/03 T/I/O= 320/760/360. (PRE ACID STIM) IA FL @ 8004' (BETWEEN STA #3 & #4). 10/15/03 CTU#5: FCO/ACID. CONTINUE RIGGING UP. DISCOVERED RING GASKET LEAK BELOW ASRC FLOW CROSS. RD INJECTOR AND LUBRICATOR, PICK BOP'S, PUMP-IN SUB, ASRC FLOW CROSS. CLEAN RING GROOVES, INJSTALL RING GASKET, RE-SET AND NIPPLE UP. RIH WITH 2.25" JSN. TAG FILL AT 9934' CTD. CLEAN OUT TO 9968' CTD AND UNABLE TO GET DEEPER. POOH TO PICK UP MOTOR AND UNDERREAMER. RECOVERED BB SIZED CERAMIC BEADS FROM NOZZLE. MU AND RIH WITH 2 3/8' MOTOR AND UR, (4.55" OD WITH BLADES OUT). TAGGED PBTD AT 9953' CTMD. PUH AND START UNDER REAMING FROM 9400' ENCOUNTERED RESISTANCE AT VARIOUS DEPTHS FROM -9450' TO 9953' CTMD. 10/16/03 CTU #5: FCO/ACID. UNDER REAMED FROM 9400' TO 9972'. HAD TO REALLY WORK FROM 9950' TO 9972' CTMD. ENCOUNTERED RESISTANCE AT BOTTOM OF FIRST SET OF PERFS AND COULD NOT MAKE PROGRESS PAST THE BOTTOM OF THE SECOND SET OF PERFORATIONS. HAD A TOTAL OF TWELVE STALLS AND FINALLY COULD NOT MAKE ANY PROGRESS PAST 9968' CTMD (9980' CORRECTED). PUMPED 5 BBL FLO PRO SWEEPS TO KEEP HOLE CLEAN WHILE UNDERREAMING. AFTER UNDERREAMING FROM 9400' DOWN TO 9950' PICK UP WEIGHTS WERE CLEAN AND -4K LOWER. LOOKS LIKE THERE MAY HAVE BEEN AN INTERMITTENT SCALE SHEATH IN THE 5-1/2" LINER DOWN TO THE PERFS. POOH W/UR. THE UNDER REAMER HAS SOME WEAR AND CHIPPED TEETH ON THE TIPS OF THE BOTTOM UR ARMS AS WELL AS ONE CHIP 3/4" IN FROM THE TIP OF ONE OF THE BOTTOM UR ARMS. BLEED TUBING AND IA DOWN AND LIQUID PACK IA WITH CRUDE, RIH WITH 2.25" BDN. ATTEMPT TO FLUID PACK AND COOL DOWN WELL WITH 3% NH4CL. INJECTIVITY WAS 0.8 BPM AT 2960 PSI. PUMP 20 BBLS OF 7.5% HCL TO CLEAN PERFS. INCREASED INJECTIVITY TO 1.6 BPM @ 2890 PSI WHP. PERFORM ACID TREATMENT IN ONE STAGE WITHOUT WAX DIVERTER. PUMPED 24 BBLS XYLENE. MADE FOUR ATl ACID TRTRATION RESULTS: 7.6% HCL, 8.1% HCL -1.9% HF <50 PPM FE. BBLS 627 370 112 168 115 138 35 138 1703 FLUIDS PUMPED 1% X-slk Crude 7.6% HCL NH4CL non-slick HCL-HF NH4CL XLS Flo Pro 60/40 Methonal TOTAL Page 1 r'- ~ TREE = WELLHEAD = A CTUA TOR = KB. ELEV = BE ELEV = KOP= Max Angle = Datum MD = DatumTVD= CrN FMC AXELSON 95.51' 55.66' 3395' 38 @ 7778' 9938' 8800' SS 10-3/4" CSG, 45.5#, L-80, ID = 9.953" 1-1 2688' Minimum ID = 2.750" @ 2094' 3-1/2" OTIS SSSV LDG NIPPLE 13-1/2" TBG, 9.2#, L-80, .0087 bpf, ID = 2.992" 1-1 9381' 1 TOP OF 5-1/2" LNR 1-1 I 7-5/8" CSG. 29.7#. ID = 6.875" 1-1 9383' 9678' PERFORATION SUMMARY REF LOG: BHCS ON 07/18/90 ANGLEAT TOP PERF: 31 @ 9942' Note: Refer to Production DB for historieal perf data SIZE SPF INTERVAL Opn/Sqz DATE 2-1/8" 4 9942 - 9958 a 07/18/90 4" 4 9968 - 9984 a 07/18/90 4" 4 9994-10012 a 07/18/90 4" 4 10022 - 10076 a 07/18/90 4" 4 10088 - 10110 a 07/18/90 4" 4 10126 - 10150 a 07/18/90 ~ 10210' I 15-1/2" LNR, 17#. L-80. .0232 bpf, ID = 4.892" 1-1 10300' I DATE 07/09/90 06/16/01 10/29/03 12/05/03 12/20/03 REV BY COMMENTS PGS ORIGINAL COMPLETION RNITP CORRECTIONS KCF/TLH SAND Da:>rH CORRECTION DA V /TLP GLM LA TCH CORRECTIONS KB/TLH SET I3P Z-O5 . ~ .-.b ~ I SAÆTY NOTES: 2094' 1-13-1/2" OTIS SSSV NIP, ID = 2.750" I ~ GAS LIFT MANDRELS TVD DEV TYÆ VLV LATCH 3003 4 MERLA DMY RM 5386 33 MERLA DMY RM 6899 36 MERLA DMY RM 7501 36 MERLA DMY RA 8014 34 MERLA DMY RA 8248 32 MERLA DMY RM PORT DATE ST MD 6 3096 5 5791 4 7637 3 8389 2 9014 1 9292 1 9322' 1-13-1/2" PARKER SWS NIP. ID = 2.750" I ~ 9329' 1-1 RIGHT-HAND RELEASE LATCH I :8: 9330' 1-17-5/8" x 3-1/2" TrN HBBP PKR, ID = 3.0" 1 9349' 1-13-1/2" PARKER SWS NP. ID = 2.750" I ~ 9353' 1-12-1/8" BKR IBP (12/19/03) 1 9370' 1-13-1/2" PARKER SWS NP, ID = 2.750" 1 ? '1~ t=J I.. I Ò I 9755' 1-1 MARKER JOINT I 110055' CTM I-IACIDSOLUBLESCALEIFORMATION SAND (10/17103) W~....., i.: "IS' "'" 1"", ,", , ~ DATE REV BY COMMENTS 9381' 1-15-1/2" BAKER SEAL ASSY W/O SEALS, ID = 4.903" I 9381' 1-1 8...MD TT LOGGED 09/08/90 I 1 UNKNOWN 1-1 OTIS BPV PRONG I 1 10111' 1-15-1/2" X 3-1/2" TrN SS-MS PKR, ID = 3.20" I 1 10116' 1-1 1 10119' 1-1 I I 3-1/2" PARKER SWS NIP, ID = 2.750" I 3-1/2" PARKER SWS NIP, ID = 2.750" I 10121' 1-13-1/2" WLEG, ID = 2.990" 1 10131' I-IELMDTTLOGGED09/08/90 I PRUDHOE BA Y UNIT WELL: Z-05 PERMIT No: 1900780 API No: 50-029-22056-00 SEC 19. T11 N. R12E, 975' FNL & 3930' FEL BP Exploration (Alaska) 'l 1. Operations Performed: Abandon 0 Alter CasingD Change Approved Program D 2. Operator r-, r"\ STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMMISSION REPORT OF SUNDRY WELL OPERATIONS SuspendD RepairWeliD Pull TubingD Operation Shutdown D Plug Perforations I]] Perforate New Pool D 4. Current Well Class: Perforate 0 WaiverD Stimulate D Time ExtensionO Re-enter Suspended WeliO 5. Permit to Drill Number: 190-0780 OtherD Name: BP Exploration (Alaska), Inc. 3. Address: P.O. Box 196612 Anchorage, Ak 99519.6612 7. KB Elevation (ft): 92.51 8. Property Designation: ADL-o028245 11. Present Well Condition Summary: Total Depth measured 10300 true vertical Effective Depth measured true vertical Casing Conductor Liner Liner Production Surface Length 70 916 10 9640 2649 Perforation depth: Measured depth: True vertical depth: Development ]] StratigraphicD 9. Well Name and Number: Z-o5 10. Field/Pool(s): Prudhoe Bay Field I Prudhoe Oil Pool ExploratoryD ServiceD 6. API Number 50-029-22056-00-00 feet 9189.9 feet 9353 Plugs (measured) Junk (measured) None 9353 feet 8392.1 feet Size MD TVD Burst Collapse 20" 91.5# H-40 39 109 39.0 - 109.0 1490 470 5-1/2" 17# L-80 9381 - 10297 8415.6 - 9187.5 7740 6820 3-1/2" 9.3# L-80 10111 - 10121 9037.2 - 9045.4 10160 10530 7-5/8" 29.7# L-80 38 - 9678 38.0 - 8666.9 6890 4790 10-3/4" 45.5# L-80 38 - 2687 38.0 - 2687.0 5210 2480 3-1/2" 9.3# L-80 @ RECEIVED FEB 7 92004 AIattrt OJ & Gas Cons. -tw,(jJ~ Commtwon Tubing ( size, grade. and measured depth): 9389 34 Packers & sssv (type & measured depth): 12. Stimulation or cement squeeze summary: Intervals treated (measured): Treatment descriptions including volumes used and final pressure: Recresentative Daily Average Production or Iniection Data Gas-Met I Water-Bbl Casing Pressure 0.97 134 1987 Daily Report of Well Operations. ! 17. I hereby certify that the foregoing is true and correct to the best of my knowledge. Contact Garry Catron Printed Name Signature Garry Catron 8Cl\NNtD MAn 1 6 2004 .~~C~ RIØIS 8Fl FEB 2 0 8" 13 Prior to well operation: Subsequent to operation: 14. Attachments: Copies of Logs and Surveys run - Form 10-404 Revised 12/2003 3-1/2" Baker HB Packer 3-1/2" TIW Packer @ 9330 @ 10111 Oil-Bbl 118 Tubing Pressure 332 200 Well Shut-in 350 15. Well Class after proposed work: ExploratoryD Development!!! ServiceD 16. Well Status after proposed work: Operational Shutdown 0 Oil I]] GasD WAG D GINJD WINJD WDSPLD Prepared by Garry Catron (907) 564.4657. ISUndry Number or NIA if C.O. Exempt: N/A Title Production Technical Assistant Phone 564-4657 Date 2/17/04 ¡"'""'\ '-'\ I-OS DESCRIPTION OF WORK COMPLETED NRWO OPERATIONS EVENT SUMMARY 12/19/03 T/I/0=SSV/1070/340. BLEED IA (FOR SECURE); IA FL AT 820' (28 BBLS), BLED IA FROM 1070 PSI TO 370 PSI TO PRODUCTION. SI BLEED AND MONITORED lAP FOR 30 MINUTES WITH NO INCREASE. GAS LIFT LINE IS STILL CONNECTED. FINAL WHP'S=SSV/370/340. 12/19/03 Set 2-1/8" IBP at 9353' Mid element in 3.5 Tubing. FLUIDS PUMPED BBLS No Fluids Pumped 0 I TOTAL Page 1 ~ TREE = WELLHEAD = ACTUATOR = KB. 8..EV = BE ELEV = KOP= Max Angle = Datum MD = DatumTVD= CrN FMC AXELSON 95.51' 55.66' 3395' 38 @ 7778' 9938' 8800' sŠ- I 10-3/4" CSG, 45.5#, L-80, ID = 9.953" H 2688' rJ Minimum ID = 2.750" @ 2094' 3-1/2" OTIS SSSV LDG NIPPLE 13-1/2" TBG, 9.2#, L-80, .0087 bpf, ID = 2.992" H Z-O5 . l - ~ I SAFETY NOTES: 2094' -f3-1/2" OTIS SSSV NIP, ID = 2.750" I À GAS LIFT MANDRELS TVD DEV TYÆ VLV LATCH 3003 4 MERLA DMY RM 5386 33 MERLA DMY RM 6899 36 MERLA DMY RM 7501 36 MERLA DMY RA 8014 34 MERLA DMY RA 8248 32 MERLA DMY RM PORT DATE ST MD 6 3096 5 5791 4 7637 3 8389 2 9014 1 9292 9322' H3-1/2" PARKER SWS NIP, ID = 2.750" I g ~ 9329' I-IRIGHT-HANDRELEASELATCH I ~ 9330' 1-17-5/8"x3-1/2"TIWHBBPPKR,ID=3.0" I lEI 9381' I (7 9383' I-----, 9678' ~ I TOPOF5-1/2"LNR H I 7-5/8" CSG, 29.7#, JD = 6.875" H PERFORATION SUMMARY REF LOG: BHCS ON 07/18/90 ANGLE AT TOP PERF: 31 @ 9942' Note: Refer to Produetion DB for historieal perf data SIZE SPF INTERV AL Opn/Sqz DA TE 2-1/8" 4 9942-9958 a 07/18/90 4" 4 9968 - 9984 a 07/18/90 4" 4 9994 - 10012 a 07/18/90 4" 4 10022-10076 a 07/18/90 4" 4 10088-10110 a 07/18/90 4" 4 10126 - 10150 a 07/18/90 I PBTD H 10210' I 15-112" LNR, 17#, L-80, .0232 bpI, ID = 4.892" H 10300' I DATE REV BY COMMENTS 07/09/90 PGS ORIGINAL COMPLETION 06/16/01 RN/TP CORRECTIONS 10/29/03 KCFITLH SAND DEPTH CORRECTION 12/05/03 DAVITLP GLM LATCH CORRECTIONS 12/20/03 KBITLH SET IBP DATE 9349' 1-13-1/2" PARKERSWS NP.ID= 2.750" I 9353' -2-1/8" BKR IBP (12/19/03) I 9370' -3-1/2"-PARKERSWSNP,ID=2.750" I \--1 9381' H5-1/2" BAKER SEAL ASSY W/O SEALS. ID = 4.903" I ~ I 9381' H ELMD TT LOGGED 09/08/90 I " I 9755' -MARKERJOINT I . . ~ 1110055' CTM -ACIDSOLUBLESCALEIFORMATION SAND (10/17103) U , - - REV BY COMMENTS I UNKNOWN H OTIS BPv' PRONG I I 10111' -f5-1/2"X3-1/2"TrNSS-MSPKR,ID=3.20" I I 10116' - I 10119' - I I 3-1/2" PARKER SWS NIP, ID = 2.750" I 3-1/2" PARKER SWS NIP, ID = 2.750" I 10121' 1-13-1/2" WLEG, ID = 2.990" I 10131' I-IELMDTTLOGGED09/08/90 I PRUDHOE BA Y UNIT WELL: Z-05 PERMIT No: 1900780 APt No: 50-029-22056-00 SEC 19. T11N, R12E. 975' FNL & 3930' FEL BP Exploration (Alaska) MEMORANDUM State of Alaska Alaska Oil and Gas Conservation Commission TO: Julie Heusser, Commissioner DATE: April 21, 2001 THRU: Tom Maunder, P. I. Supervisor FROM: Lou Gdmaldi, SUBJECT: Petroleum Inspector SVS Tests BPX Z-pad Prudhoe Bay Field Saturday, April 21, 2001; I witnessed the three-month SVS retests on BPX Z pad in the:Western Operating Area of the Prudhoe Bay Field. Merv Liddelow performed the SVS tests today. The test results (one SSV Failure) are noted on the accompanied SVS test spreadsheet. All well houses were in "OK" condition. This was the first experience I have had with the new SV control system on Z pad and found it to operate quite well. The temperatures today were somewhat mild (+15) and it remains to be-seen how they will hold up during next winter's cold season. Wells Z'5 and Z-8 had slow closing SSV's (+ 2 minutes), Merv called the Automation crew and these were being worked on before I left the pad. The pad is being used as a staging area for some pipeline fabrication and has some equipment and material stored on it. This was kept for the most part neat and orderly. SUMMARY: I witnessed the three-month SVS retests on Z pad in the Prudhoe Bay Field. 20 wells, 40 components, One failUre, 2,4% 34 Wellhouse inspections, no problems. Attachments: SVS PBU Z pad 4-21-01 LG.XLS NON-CONFIDENTIAL SVS PBU Z pad 4-21-01 LG Alaska Oil and Gas Conservation Commission Safety Valve System Test Report Operator: BPX Operator Rep: Merv Liddelow AOGCC Rep: Lou Grimaldi Submitted By: Lou G. Date: Field/Unit/Pad:.p .m. dhoe Bay Field, g pad. Separator psi: LPS 159 HPS 21-Apr Well Permit Separ Set L/P Test Test Test Date Oil, WAG, GIN J, Number Number PSI PSI , Trip Code Code Code Passed GAS or CYCLE Z-01 ' ' 1880~6'0' "I"5~J ....... 125 125 ' P P ' ' ' ,,Z,-02A ,, i,. 1960430 ....... Z-03 15571310 1159 125 ' i'15... P .... ~"' _ Z-04 1891230 Z-05 1900780 ' ' '1591 '125 155 P 'e ........... z-06 1880320! 159 125 125 P P Z-07A 1931100! ' Z-08'~' '~' 1931'280 .... 159 ' "1'25 i20 P e "" ........... z-09 ...... 1890850! ................................ ..... ..... tz,io " _ ..... 89ii6o ",,' ................ , .., , ...... Z-11 1900720 i59'' 'i25 125 'p' e Z-12 1891020 'Z-13 1900940 "1"59 i25 "'i2~ ' 1~ P ........ Z. 14A " 1980~5'10 ..................... Z..i5 ... 88oi 80 ........ Z'16 1920120 i59 125 125 P P z-17 1'891390 159 125 125 P P 'Z-18 1890960 ........................ z-19 1920230 z-20 1881000 'z"21 1890420 '159 'i'2'5'' 12~ p '"p ........................... Z-22B" 1960350 159 125 115 P e Z-23A''' i9504~0 " 159 " i25' 125 P .... P ............... z-24 1890180 159 "i25! 125 P 4' ,,r~,~-~ ~ ~%\~ /~?"' Z-2b" i88f590 '" 159 'i25' "125 P P ..... z-26 "' 1'890520 ..... i5'9' 125 125 P ....P ........ z-27' 1966310 '" i59 ......... i2~" 125! P "" .... P , , ,, , , , , , , Z-28' 1881270 Z-29 1890650 159: 1'25 120! P P Z-30 1900230 159 125 1201P P Z-31 1881120 ~Z'3'2B , ,,1,970340 1'59 12~' 1,25 .~P , P ,, ,, , , Z-33A 1890050! Z.35 - i980930~ .................. Z-38 1980600" ' 159 125 120 P' "P .......... RJF 1/16/01 Page 1 of 2 SVS PBU Z pad 4-21-~_~_G Well I Permit Number Number Wells: 20 Remarks: Separ set L~'~ I' .Test. I ~Test [~ TeSt[ ~ 'Date -P I Oi~WAg, GnSj,[ PSI PSI Trip ] Code ] Code ] Code ] Passed ] GAS orCYCLE Components: ..... ~ 40_ Failures: .... I, Failure Rate: 2.50% D. o0.~ Day~ Z-5 & 8 Long closure times on SSV. RJF 1/16/01 Page 2 of 2 SVS PBU Z pad 4-21-01 LG MEMORANDUM State of Alaska Alaska Oil and Gas Conservation Commission TO: Julie Heusser Commissioner DATE: January 23, 2001 THRU: FROM: Tom Maunder, /4~_~~ P. !. Supervisor O~l~-o \ Jeff Jones, SUBJECT: Petroleum Inspector Safety Valve Tests Prudhoe Bay Unit Z Pad ~Fridav. January 19..200!; I traveled to BPX's Z Pad in the Prudhoe Bay Field and witnessed surface safety valve system testing. Merv Liddelow was the BPX representative in charge of testing. As the attached AOGCC Safety Val.~e System Test Report indicates I witnessed the testing of 21 wells and 43 components with 6 failures. The pilot on well Z-03 failed to trip and the pilot on well Z-08 was frozen and once thawed it passed a retest but the SSV on this well had an unacceptable closure time (12-min.). The SSV on well Z-18 also had an unacceptable closure time (15-min.) and the SSV's on wells Z-22B and Z-24 failed to pressure test. The high failure rate on Z Pad requires it be placed on a 90- day test interval. Mr. Liddlow indicated to me today that all failures have been repaired except the slow SSV closure of wells Z-08A and Z-18. The hydraulic lines on these wells need to be flushed and he has arranged for the maintenance crew to perform the work. Wellhouse inspections were conducted on the 21 wells tested with no exceptions noted. ~ummarv: i witnessed SVS testing at BPX's PBU Z Pad. 21 wells, 43 components, 6 failures. 13.9% failure rate. 2"i wellhouse inspections conducted. Affachment: SVS PBU Z Pad 1-19-01 JJ Alaska Oil and Gas Conservation Commission Safety Valve System Test Report Operator: BPX Submitted By: Jeff Jones Date: 1/19/01 Operator Rep: Merv L!ddel°w Field/Unit/Pad: PBF/PBU/Z Pad AOCK2C Rep: Jeff Jones"' Separator psi: '" LPS' i'~9 ' ' HP~ Well Permit Separ I Set L/P Test Test Test Date Oil, WAG, Gl]NJ, Number Number PSI PSI ,,Trip Code Code Code Passed (;AS or ,CY ,CL~ i i ii i~ i ii i~ iii i j i Z-01 1880660 1591 125 125 P OILi Z-02A ' i960430 ..... Z-03 19~1310 159 125 0 ' 1 P OIL Z-04 1891230 Z-05 1900780 159" ' 125 120 P P OIL .. . , · . Z-06 1880320 Z'.07A ' ~ ,1.931 ~00 ...... i ................... Z'-08A i'931280' 159 "125 0 2 '" 43 ' 1/22/01 OIL Z-09 1890850 ., .... ............................ Z-10 1891160 Z-11 1906720 '" 159i .... 125 '125 P P .................. OIL Z-12 1891020 Z-13 1900940 159 125 12~ P P 0IL Z-14A 19g(J~10 .................... Z- 15 1880880 Z-16 1920120 '"139 '' 125 " 1'25 "'P .... P ..... OIL: Z-17 18913 /6 159 125 125 p p oIL! Z'18 1890960 159 125 120i P 43 :' 0iL z-19 1920230 z-20 1881000 z-21 1890420 Z-22B 196035'0 "'1'59 125 125" P '~ ............ OIL Z-23A 1950430 Z-24 1890180 15~ ' 125 13~J ' ~' 4 0IL Z-25 1881590 159 .... '12'5' ' 1~' P P OIL Z-26 1890520 159 125 125 P ' P OIL Z-27 1900310 159 125 125 P P OIL Z-28 1gg1270 Z'29~ ~ 1890650 " 159 125 120 P " P OIL Z-30 1900230 ' 'i'5'~ 'i 25~ 115 P P " OIL Z-31 1881120 Z'32B 19~0340 "' 15'~} ~' 'i2~1' ' 125 ~' P ' P "' OIL iZ-33A 1890050 2750 2600 2500 P P i· GINJ Z-35 1980930 . 1.5.9 ..... 12-5~ 120. P P .......... 0IL 1/24/01 Page 1 of 2 SVS PBU Z Pad 1-19-01 JJ.xls W~! Pemit Separ Set ~ Test T~t T~t Date Number Number PSI PSI Trip Code Code Code Pass~ Z-38 19806~ 159125 120 P P OIL Wells: ~ ~ 21 Components: ....... .4.3 Failures: ....... 6 Failure Rate: 13.9°/d~i 5o my_ Remarks: Z-08A SSV failed_:_12 minute..e. !0.se,.' .Z...-..1,8 ss,v fa~l,,' ed: 15 minute clo~, frozen pilot .. thawed_. & passed retest. , ......... . . . . _ 1/24/01 Page 2 of 2 SVS PBU Z Pad 1-19-01 JJ.xls THE MATERIAL UNDER THIS COVER HAS BEEN MICROFILMED ON OR BEFORE OCTOBER 27 2000 E E C:LORI~4FILM.DOC PL E W M A TE R IA L U N D ER THIS M.A R K E R STATE OF ALASKA ALAS.~'-c-~OIL AND GAS CONSERVATION COMMISSIC--' REPORT SUNDRY WELL OPE,,ATIONS 1. Operations performed: Operation shutdown Stimulate__ Plugging__ Pull tubing__ Alter casing Repair well Perforate Other ~ 2. Name of Operator BP Ex/~loration (Alaska) Inc. 3. Address P, O. Box 196612, Anchora(~e, Alaska 99519-6612 4. Location of well at surface 975' SNL, 3930' WEL, SEC. 19, T11N, R12E At top of productive interval 4639' SNL, 1717' WEL, SEC. 13, T11N, R11E At effective depth 4519' SNL, 1847' WEL, SEC. 13, T11N, R11E At total depth 4484' SNL, 1886' WEL. SEC. 13, T11N, R11E 5. Type of Well: Development ..~ Exploratory ~ Stratigraphic ~ Service __ 6. Datum elevation (DF or KB) KBE=95.51 7. Unit or Property name Prudhoe Bay Unit feet 8. Well number Z-05(34-13-11-11) 9. Permit number/approval number 90-78 / 10. APl number 50-029-22056 11. Field/Pool Prudhoe Oil Pool 12. Present well condition summary Total depth: measured true vertical Effective depth: measured true vertical Casing Length Structural __ Conductor 110' Surface 2648' Intermediate 9638' Production __ Liner 891' Perforation depth: measured 10300' feet Plugs (measured) 9190' feet 10210' feet Junk (measured) 9025' feet ~, ~:.~ ~" Size Cemented Measured depth True'vertical depth BKB 20" 150 150 10 3/4" 1949 cu ft Permafrost 2688 2690 7 5/8" 1214 cu fi Class G 9678 8669 5 1/2" 196 cu ft Class G 9409-10300 8441-9192 9942'-9958'; 9968'-9984', 9994'-10012', 10022'-10076', 10088'-10110', 10126'-10150' true vertica§ubsea 8803'-8817'; 8825'-8834',8847'-8862',8871'-8916',8926'-8944'.8957'-8976' Tubing (size, grade, and measured depth~ 1/2" 9.2# @9389' Packers and SSSV (type and measured depthPacker set @ 9330 and SSSV set @ 2094' 13. Stimulation or cement squeeze summar~ee Attachment Intervals treated (measured) Treatment description including volumes used and final pressure nRISI AL 14. Prior to well operation Subsequent to operation Representative Daily Average Production or Injection Data Oil-Bbl Gas-Mcf Water-Bbl Casing Pressure 453 0 81 0 777 2124 456 0 Tubing Pressure 250 3O0 15. Attachments 16. Status of well classification as: Copies of Logs and Surveys run__ Daily Report of Well Ope/r~ons OilX Gas . Suspended 17. I hereby certify ~h, at th94ro/f'egoing is tr,,u'ej,-~d, c_...orrect to the best of my knowledge. S ig n ed~~, _~.,,".~4.,~~/~'~ _ ~/~ TitleTechnicalAssistantlll Service Form 10-404 Rev 06/15/88 SUBMIT IN DUPLICATE Z-05 DESCRIPTION OF WORK COMPLETED Stimulation Operation 12/O2/97 A Acid Stimulation Treatment was performed using the following fluids: SUMMARY Rig up slick line, Rig in hole and tag @ 10038' (corrected). Pick up coil BHA #3 and Rig in hole for TEL. (Coil assembly smaller and stiffer- thought to be damaged casing or a partial bridge at WL tag depth) Tag with coil at 10033' (corrected to "X" nipple). This was a 5' correction to coil flag depth used above. Well was cleaned out to 10069' yesterday, based on this correction. Large amounts of acid soluble scale is entering into wellbore. Cleaning the well out and replacing with a sand plug per the program is not possible. Discuss with NRWO TL and Pad Engineer. Decision was made to continue with acid treatment using the scale as a plug back. Pull out of hole. Freeze protect and prepare for acid treatment. Rig up HB&R on IA. Rig in hole with BHA #4. Correct to flag and tag at 10033'. Rig up Dowell for acid job. Pump 150 bbl cool down stage with 2% KCI water. Acidize with 233 bbls 12%HCL/10% Xylene (DAD) acid with additives as described below in 4 stages with three diverter stages of wax beads (1500# total). Reciprocate coil through perforations during first acid stage. Saw ~400 psi pressure increase when each diverter stage hit perforations. Over displace acid with 50 bbls of slick 2% KCI water. Pulled out of hole with coil. Freeze protect coil, and turn well over to Trico for flow back. Rig down DS CTU #6. Fluids Pumped BBLS. Description 190 Meoh 1132 Filtered Slick 2% KCL Water 51 FIo Pro 22 Diesel (IA Freeze Protect) 233 12% HCL/10% Xylene (DAD Acid System) 49 HEC Polymer Gel 1677 Total BBLS STATE OF ALASKA ALasKA OIL AND GAS CONSERVATION COMMIS, 4 REPORT OF SUNDRY WELL OPERATIONS 1. Operations performed: Operation shutdown Stimulate X Plugging Pull tubing Alter casing Repair well Perforate Other 2. Name of Operator BP Exploration (Alaska) Inc. 3. Address P. O. Box 196612, Anchorage, Alaska 99519-6612 5. Type of Well: Development X Exploratory Stratigraphic Service 4. Location of well at surface 975' SNL, 3930' WEL, SEC. 19, T11N, R12E At top of productive interval 4639'SNL, 1717'WEL, SEC. 13, T11N, R11E At effective depth 4519'SNL, 1847'WEL, SEC. 13, T11N, R11E At total depth 4484'SNL, 1886' WEL, SEC. 13, T11N, R11E 12. Present well condition summary Total depth: measu red true vertical 10300' feet Plugs (measured) 9190' feet 6. Datum elevation (DF or KB) KBE=95.51 feet 7. Unit or Property name Prudhoe Bay Unit 8. Well number Z-05(34-13-11-11) 9. Permit number/approval number 90-78 / 10. APl number 50- 029-22056 11. Field/Pool Prudhoe Oil Pool Effective depth: measured true vertical 10210' feet Junk (measured) 9025' feet Casing Length Structural -- Conductor 110' Surface 2648' Intermediate 9638' Production -- Liner 891' Perforation depth: measured Size Cemented Measured depth 20" 150 10 3/4" 1949 cu ft Permafrost 2688 7 5/8" 1214 cuft Class G 9678 5 1/2" 196 cuft C/ass G 9409-10300 9968'-9984', 9994'-10012', 10022'-10076', 10088'-10110', 10126'-10150' True ve~icalde~h BKB 150 2690 8669 8441-9192 true vertical subsea8825'-8834',8847'~8862',8871 '-8916',8926'-8944'. 8957'-8976' Tubing (size, grade, and measured depth) 3 1/2"9.2# @9389' Packers and SSSV (type and measured depth) Packer set @ 9330 and SSSV set @ 2094' AUG 1995 13. Stimulation or cement squeeze summary See Attachment Intervals treated (measured) Treatment description including volumes used and final pressure ~s~ PJI & Gas Cons. Commissi_o_~! .... --"~<,~. ~aclt0rag~l ,' 14. Prior to well operation Subsequent to operation Representative Daily Average Production or Injection Data Oil-Bbl Gas-Mcr Water-Bbl Casing Pressure 762 1932 0 0 777 2124 456 0 Tubing Pressure 295 300 15. Attachments Copies of Logs and Surveys run Daily Report of Well Operations 16. Status of well classification as: Oil X Gas__ Suspended Service Signed(~. ,,,~!~~~ ( ,/_../~/// ~ Title Senior TechnicalAssistant II Date Form 10-404 Rev 06/15/88 -7 SUBMIT IN D~PLI~'ATE 9/09/94 WELL Z-05(34-13-11-11) Stimulation Operation A HCL Treatment was performed to remove scale using the following fluids: OPERATIONS SUMMARY Pump Stage #1-35 Bbl. 15% HC1 + 10% Xylene. Reciprocate across jewelry from 9200' to 9400'. shut down let acid soak. Pump Stage #2-65 Bbl. 15% HC1 + 10% Xylene and wash to hard bottom at 10112' CTD. Unable to wash deeper. Reciprocate across liner. 220 Bbl. 70 Bbl. 107 Bbl. 83 Bbl. FLUIDS PUMPED Sea Water to fluid pack Inner Annulus Dead Crude in Inner Annulus 15% HC1/10% Xylene Sea Water for flush TOTAL: WELL~ NOT IN AOGICC COMPLIANCEiexel. Susp,/H20 Inl,/Weivera) (so~ted J~/(:late) GL WELLS NOW [JHOW THE SAME SA.P. AG TIlE INJ HEADER IN/OUT! n,'t~, SIZE/TYPE, --- ,.---- T PpM ~,'EaHz,~.... COMMENT!~ FL ,, OUT ~.....~/' 6" ClW Rig and rig'e.,amp proxim~ d-03 ~1,'~1 275C 11 41/2RQ OI1~ '- H 1 13 tent set sasv 9-28-94 FI. OUT ~ .... ctu/hcl acid treatment up C~ming W-04 714~4 , 1 ~0C 36 $1/2 X OTIS L 7 11 tent ~,t ~.~v 9-20-94 . FL OUT 4' OIW u"tulp~er stimulati°n ui~ ~oml~;I ' W-15 GL 7~/~4 51 4 1/2 X OTIS L 6_.. 9 te~t sat sssv 9-20.94 FL OUT 3,". CIW Flow back fl~m acid j~ in progress Z-05 ~ 7113/94 0 3 1/2X AXEL$ON L ? 12 tentsat~$vg-15-94 FL OUT K-VALVE ~ waiti~D ~ paris for k-valve R-12 GL 7/24/~.. 1990 78 23/8C OTIS L 29 400 Ientset$_';~_vg-18-94 FL OUT 4' .C;..NV Lip COming ~U/pel'f job Z-07a GL 7/24/94 21 ,4 1/~ X 9TIS L 6 20 :e~t set sssv 9-20.94 FL OUT 4* CNV ~1 down for g¢-e w~rk well unlneding J-28 8/2/g4. ,, 2200 6.4 5 1/2 C AXEL$ON H 5 8 :ent sat sssv FI (~I. IT 4' CNV !up coming ~a~/perf~ '- _R._-17 GL 8/8/94 1, 99068 4 1/2 X AXELSO~N L 18 36 tent s?! sssv 9-20.~ FL OUT .._.8, FMO ~1~ ~umi~ t~gglng ar~'d gl wort~ -- w.3 T 8/5/94 176C 67 31/2X BAKER L 8 8 tent sat ~-v 9-20-94 5-112"0 & 4-1/2" - C.,AMCO FLAPPERS ALI. O1'1 lr'R~. OTIS Ball Valvuu (i,e, B & O Lines ~ I~1 (;emmun~calton) X ~ AOGC, C; Waiver le have ,~;~$v out (long-term 8J well) * · ~ OON'l'l~L lINE MANIF--(:~.~ INOT~N.L£D OCL - CONTINUOUS CONTROL LINES ECJ~ - CMERGENOY OA$1N01 8LIPS P-PILOT,' D- Duel H-High Press L- Low Press REVISED: 9/4~94 (*H28: 5/9194 ) DEl- DRILLBY FAO- FAGiMTY C_~ -GA,SUIT C_.~3R - HIGH GAS/OIL RATIO M~C- MECHANICAL FAILURE PI~ - PROD ENGINEER I~t. LOW PI RCKB-~ ~:~Z- SQUEEZE WO- WA'FFJt CUT J** CHECK H2S BEFORE WORKING ON WELL ANY WELLS ABOVE 20 PPM F~EQUIRE A SNIFF ?F#OR TO COMMENCING OPERATIONS. STATE OF ALASKA ALAS~'"OIL AND GAS CONSERVATION COMMISSIC'~'' REPORT (.,F SUNDRY WELL OPEr, ATIONS 1. Operations performed: Operation shutdown Stimulate 3( Plugging Perforate Pull tubing Alter casing Repair well Other 2. Name of Operator BP Exploration (Alaska) Inc. 3. Address P. 0. Box 196612, Anchorage, Alaska 99519-6612 4. Location of well at surface 975' SNL, 3930' WEL, SEC. 19, T11N, R12E At top of productive interval 4639'SNL, 1717' WEL, SEC. 13, T11N, R11E At effective depth 4519'SNL, 1847' WEL, SEC. 13, T11N, R11E At total depth 4484'SNL, 1886' WEL, SEC. 13, T11N, R11E 5. Type of Well: Development Z . Exploratory Stratigraphic Service ORIGINAL 6. Datum elevation (DF or KB) KBE=95.51 feet 7. Unit or Property name Prudhoe Bay Unit 8. Well number Z-05(34-13-11-11) 9. Permit number/approval number 90-78 / 10. APl number 50- 029-22056 11. Field/Pool Prudhoe Oil Pool 12. Present well condition summary Total depth: measured true vertical Effective depth: measured true vertical Casing Length Structural -- Conductor 110' Surface 2648' Intermediate 9638' Production -- Liner 891' Perforation depth: measured 10300' feet Plugs (measured) 9190' feet 10210' feet Junk (measured) 9025' feet Size Cemented Measured depth 20" 150 '0 3/4" 1949 cu ft Permafrost 2688 7 5/8" 1214 cu fl C/ass G 9678 5 1/2" 196 cuft C/ass G 9409-10300 9968'-9984', 9994'-10012', 10022'-10076', 10088'-10110', 10126'-10150' True ve~icaldepth BKB 150 2690 8669 8441-9192 true vertical subsea8825'-8834~8847'-8862~8871L8916~892658944~895758976' Tubing (size, grade, and measured depth) 3 1/2" 9.2# @9389' Packers and SSSV (type and measured depth) Packer set @ 9330 and SSSV set @ 2094' RECEIVED 13. Stimulation or cement squeeze summary See Attachment Intervals treated (measured) Treatment description including volumes used and final pressure JUL 1 1994 Alaska 0il & Gas Cons. Commission Anchorage 14. Prior to well operation Subsequent to operation Representative Daily Average Production or Injection Data OiI-Bbl Gas-Mcf Water-Bbl Casing Pressure 740'"/2722'''/'''2;2 '4 0 0 970 6 392 0 Tubing Pressure 248 272 15. Attachments Copies of Logs and Surveys run Daily Report of Well Operations 16. Status of well classification as: Oil X Gas Suspended Service 17. I hereby certify that the fore.(3~ing Signed (~/~c,.~,_~ ~_~ Form 10-40,[ Rev 06/15/88 is true and correct to the best of my knowledge. H 4:~.~J Title SeniorTechnicalAssistantl Date ~'/////¢~ SUBMIT IN DUPLICATE 08/06/93 WELL Z-05(34-13-11-11) Addperf/Stimulation Operation A HCL Acid Wash Treatment was performed using the following fluids: SUMMARY: 1. DRIFTED TUBING WITH 2.50" NOZZLE, DID NOT SEE ANY RESTRICTION UNTIL WE SET DOWN ON FILL AT 10,021 Fl' CTD. 2. JETTED TUBING WITH 20 BBL OF HCL/XYL ACID FROM 9200 - 9420 FT (3 PASSES), LET ACID SOAK FOR 50 MIN. 3. JETTED LINER FROM 9,410-10,098 Fr WITH 43 BBL OF HCL / XYL ACID, JETTED FILL FROM 10,020 - 10,098 FT WITH ACID. 4. POOH AND POP AT 1730 HRS. 08/18/93 LINER CLEANED OUT TO 10,098 FT CTD (FIRM TD, NO MORE PROGRESS) FLUIDS PUMPED DOWNHOLE SEA WATER: 60 BBL (FILTERED) 15 % HCL/10 % XYLI::NI= 63 BBL TOTAL = 123 BBL The following additional intervals were perforated using 2 1/8" guns, 4 SPF, random orientation and 0° phasing. 9942' - 9958' MD fjh 7/11/94 dui_ ~ 3 1994 Alaska {git a Gas Cons. Commission Anchorage BP EXPLORATION BP Exploration (Alaska) Inc. 900 East Benson Boulevard RO, Box 196612 Anchorage, Alaska 99519-6612 (907) 561-5111 DATE: 08/25/93 T# 84939 BPX/PBU~LOGS Enclosed is your copy of the materials listed below. If you have any questions, please contact BP Well Records at (907) 564-4004. B-157q-l¢~ CNL~ (~ ~-~ ~- 08/16/93 C-24~-~% [PERF)~CJCL-LZ-. · _08/11/93 C-32 %~ 53 PDK-100/ff~~~/20 / 93 M-06A ~ERF)~~U 08/17/93 M-18Bq%-Sq PDK-100 ~e[~~/19/93 S-2790-~ [PERF']g~L~~ 08/19/93 Z-0590-~~ ~PERF)~C/~C~ 08/18/93 Z-07 90~7 C~ 08/18/93 8800.00- 9645.00 ATLAS 5 " 9850.00-10313.00 ATLAS 5 " 9700.00-10425.00 ATLAS 5 " 200.00-10303.00 ATLAS 2/5" 11130.00-11600.00 ATLAS 5 " 8900.00- 9400.00 ATLAS 5 " 11350.00-11700'.00 ATLAS 5 " 10510.00-10830.00 ATLAS 5 " 9620.00-10050.00 ATLAS 5 " 11670.00-11954.00 ATLAS 5 " Information Control Well Records STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMMISSION REPORT OF SUNDRY WELL OPERATIONS ^ 1. Operations performed: Operation shutdown Stimulate X Plugging Perforate '///~ Pull tubing Alter casing Repair well Oth · · 2. Name of Operator 5. Type of Well: elevat~o BP Exploration (Alaska) Inc. Development X KBE=95~jl~feet Exploratory 7. Unit or Property name 3. Address Stratigraphic P. O. Box 196612, Anchorage, Alaska 99519-6612 4. Location of well at surface 975' SNL, 3930' WEL, SEC. 19, T11N, R12E At top of productive interval 4639'SNL, 1717'WEL, SEC. 13, T11N, R11E At effective depth 4519'SNL, 1847' WEL, SEC. 13, T11N, R11E Service Prudhoe Bay Unit 8. Well number Z-05(34-13-11-11) 9. Permit number/approval number 90-78/ 10. APl number 50- 029-22056 At total depth 4484' SNL, 1886' WEL, SEC. 13, T11N, R11E 12. Present well condition summary Total depth: measured true vertical Effective depth: measured true vertical 10300'feet Plugs (measured) 9190'fe et 10210'feet Junk (measured) 9025~eet 11. Field/Pool Prudhoe Oil Pool Casing Length Size Cemented Measured depth True vertical depth Structural -- BKB Conductor 110' 20" 150 150 Surface 2648' 10 3/4" 1949 cu ft Permafrost 2688 2690 Intermediate 9638' 75/8" 1214 cu ft Class G 9678 8669 Production -- Liner 891' 5 1/2" 196 cu ft Class G 9409-10300 8441-9192 Perforation depth: measured 9968'-9984', 9994'-10012', 10022'-10076', 10088'-10110', 10126'-10150' true vertical subsea8825'-8834', 884 7'-8862', 88 71 '-8916', 8926'-8944'. 8957'-89 76' Tubing (size, grade, and measured depth) 31/2"9.2#@9389' RE(~EIV~D Packers and SSSV (type and measured depth) Packer set @ 9330 and SSSV set @ 2094' 13. Stimulation or cement squeeze summary MAR 1 5 t99, a~l,/~ nil ,~ Gas Gorls. CO[.t. ttll~',ssio'[~ 10/08/91 A HCL Treatment was pedormed using the t&~~iiuid~nchorage Intervals treated (measured) Treatment description including volumes used and final pressure 90 bbls 15% HCL 120 bbls PW 25 bbls Methanol 14. Prior to well operation Subsequent to operation Representative Daily Average Production or Injection Data OiI-Bbl Gas-Md Water-Bbl Casing Pressure 1020 1098 80 1035 1630 1641 127 1244 Tubing Pressure 29O 3O7 15. Attachments Copies of Logs and Surveys run Daily Report of Well Operations 16. Status of well classification as: Oil X Gas Suspended Service 17. I hereby ce~ify that the foregoing is true and correct to the best of my knowledge. Si~lned ' ' ' {~ J_ C~,,j~,4~ Title Senior TechnicalAssistant I Form 10-404~R~v'06/15/88 7~ Date SUBMIT IN DUPLIGATE BP EXPLORATION BP Exploration (Alaska) Inc. 900 East Benson Boulevard P.O. Box 196612 Anchorage, Alaska 99519-6612 (907) 561-5111 TO: DISTRIBUTION Date: 10/16/90 T#:81597 FROM: SUBJECT: Information Control Well Records LR2-1 BP CA~ED HOLE FINAL~. Enclosed is your copy of the matedal listed below. If you have any questions, please contact BP Well Records at (907) 564-4445. .-~"05 COLLAR 10/12/90 #1 10900-11168 ATLAS 5" ~,.E~05 GR 10/12/90 #1 10800-11043 ATLAS 5" INJ 09/28/90 #1 9550-9895 CAMCO 5" INJ 09/28/90 #1 10650-10845 CAMCO 5" INJ 09/25/90 #1 8450-9887 CAMCO 5" ~:~'5 PROD-F 09/26/90 #1 9800-10174 CAMCO 5" ~23 PERF 10/10/90 #1 9300-9684 SCH 5" Distribution: ARCO CHEVRON EXXON GEOSCIENCES MOBIL PHILLIPS RESERVOI~ RECEIVED OCT 1990( {{ / Alaska o TO: FROM' SUBJECT: BP EXPLORATION BP Exploration (Alaska)Inc. 900 East Benson Boulevard P.O. Box 196612 Anchorage, Alaska 99519-6612 (907) 561-5111 R EC DISTRIBUTION OC'"~' ° "~ B90//~ ~~te :09,25/90 Ai~st(a 0it& 6as Information Control Well Records LR2-1 // BP CASED HOLE FINALS Enclosed is your copy of the material listed below. If you have any questions, please contact BP Well Records at (907) 564-4445. Z,05 CCL 09/08/90 #1 9240-101 63 Camco 5" Distribution' ARCO CHEVRON EXXON GEOSCIENCES MOBIL PHILLIPS RESERVOIR STATE OF ALASKA ARCHIVES BP EXPLORATION BP Exploration (Alaska) Inc. 900 East Benson Boulevard P.O. Box 196612 Anchorage, Alaska 99519-6612 (907) 561-5111 TO: ARCO Date:07/25/90 CHEVRON T#:81428 EXXON MOBIL PHILLIPS TEXA~ GE-OSCIENCE ARCHIVES BP OPEN HOLE FINAL Enclosed is your copy of the matedal listed below. If you have any questions, please contact BP Well Records at (907) 564-4445. Z-05 BHCA 07/18/90 #1 9672-10269 Atlas 2"/5"I 2"/5" /~ Z-05 CN/GR 07/18/90 #1 6970-10241 Atlas 2"/5"\ Z-05 DIFL 07/18/90 #1 9672-10298 Atlas Z-05- FMT 07/18/90 #1 9702-10238 Atlas 2"/5" I Z-05 GEOS/ARCO/EXXON/ARCHIVES ONLY. SS TVD 07/18/90 Atlas STATE ONLY: Magnetic Single Shot Directional Survey Date: Gyroscopic Directional Date: Inforation Control Well Records LR 2-1 J.. Dietz/S. McCurry Job~: Jol:~: 1 "/2" RECEIVED OCT 0 1990 Ala~,a Oil & Gas Cons. Commission Anchorage ' '~'" STATE OF ALASKA D I~ I G IN A ALASKA uiL AND GAS CONSERVATION coMMISSION LL COMPLETION OR RECOMPLETION REPORT AND Status of Well OIL [] GAS [] SUSPENDED [] ABANDONED [] SERVICE [] Operator Classification of Service Well Address P. O. Box 196612, An~ Aiaska 99519-6612 of well at surface 975' SNL, 3930' WEL, SEC. 19, T11N, R12E At Top Producing Interval 4639'SNL, 1717' WEL, SEC. 13, T11N, R11E At Total Depth ~ Number 90-78 ~ Number 50- 029-22056 Unit or Lease Name ~rudhoe Bay Unit J0. Well Number Z-05(34-13-11-11) 1. Field and Pool :~rudhoe Bay Field/Prudhoe Bay Pool 4484' SNL, 1886' WEL, SEC. 13, T11N, R11E 5. Elevation in feet (indicate KB, DF, etc.) 16. Lease Designation and Serial No. "~'E = 92.51' I ADL 28245 . . . 07-04-90 ' --' Thickness of Permafrost · otal De th~~ ~ 120. Depth ~SSSV set !1. ~ ' feet U D 1892' 10300'MD/9190'TVD Electric or Other Logs Run DIFL//BHC/CNL/GR, RFT 23. CASING, LINER AND CASING SIZE -- SETTING DEPTH MD WT. PER FT. GRADE TOP BO'FI'OM 20" Surface 110' 10-3/4" 45.5# L-80 Surface 2688~' 7-5/8" 29. 7# ~ L-80 Surface 96 78' 5-1/2" 17# NT80 9409' 10300' open to Production (MD+TVD of Top and Bottom and interval, size and number) Baker 4" @ 4 spf MD TVD ss 9968'-9984' 8825'-8834' 9994'- 10012' 8847'-8862' 10022'- 10076' 8871 '-8916' 10088'- 10110' 8926'-8944' 10126'- 10150' 8957'-8976' 27. ;EMENTING RBS~RD HOLE SIZ~E 13-1/2" 9- 7/8" CEMENTING RECORD AMOUNT PULLED 1949 cufl Permafros~t 1214 cu ft Class G 6-3/4" 196 cu ft Class G 25. TUBING RECORD SIZE I DEPTH SET IMD) PACKER SET 3-1/2" 9.2# 9389' 9330' 26. ACID, FRACTURE, CEMENT SQUEP-ZI=, ETC. DEPTH INTERVAL (MD) I AMOUNT & KIND OF MATERIAL USED 10-3/4" x 7-5/8" I Freeze Protect Annulus with 188 bbls l Dry Crude PRODUCTION TEST D~'-ate First Production [~ethod of Operation (Flowing, gas lift, etc.) . ~ ~~ ~"~, ~ ]-~'~ ~ [OiL GRAVITY-APl (corr, !8. CORE DATA 3fief description ~gY, porosity, fractures, apparent ~-ps, and presence of oil, gas or water. Submit core chips. RATIO RECEIVED Form 10-407 Rev. 7-1-80 CONTINUED ON REVERSE SIDE 29. 30. GEOLOGIC MARKERS .~RMATION TESTS NAME Include interval tested, pressure data, all fluids recovered and gravity, MEAS. DEPTH TRUE VERT. DEPTH GOR, and time of each phase. Sag 9680 8869 Shublik A 9717 8701 Zone 4 9890 8851 31. LIST OF ATTACHMENTS 32. I hereby certify that the foregoing is true and correct to the best of my knowledge INSTRUCT~NS General: This form is designed for submitting a complete and correct well completion report and log on all types of lands and leases in Alaska. Item 1: Classification of Service Wells: Gas injection, water injection, steam injection, air injection, salt water disposal, water supply for injection, observation, injection for in-situ combustion. Item 5: Indicate which elevation is used as reference (where not otherwise shown) for depth measurements given in other spaces on this form and in any attachments. Item 16 and 24: If this well is completed for separate production from more than one interval (multiple completion), so state in item 16, and in item 24 show the producing intervals for only the interval reported in item 27. Submit a separate form for each additional interval to be separately produced, showing the data pertinent to such interval. Item 21: Indicate whether from ground level (GL) or other elevation (DF, KB, etc.). Item 23: Attached supplemental records for this well should show the details of any multiple stage cement- ing and the location of the cementing tool. Item 27: Method of Operation: Flowing, Gas Lift, Rod Pump, Hydraulic Pump, Submersible, Water In- jection, Gas Injection, Shut-in, Other-explain. Item 28: If no cores taken, indicate "none". Form 10-407 BP EXPLORATION DALLY DRILLING REPORT: PRUDHOE As of 0600 Hrs. Friday, July 6, 1990 WELL: Z-5 (34-13-11-11) RIG: AUDI #2 Day: 2 Depth at 0600 Hrs. = 2700 48 Hour Footage = 2700 AP! No. AFE Number: AFE Amount = Currant Field Cost = Estimated Final Cost = 12510 Current Operation: POH to run 10-3/4" casing. Summary of Last 48 Hours: Ddiled 13-1/2" hole to 2700' MD. Accepted rig 1300 hrs. 7/4/90. Mud Tvoe Mud Weiaht Viscositv P V Spud 10.2 #/gal 80 Sec. 20 Survey Deoth Anale Direction TVD Y.P. Fluid Loss Solids Temp 23 12.0 cc 11.5% 70 °F ,, Section Coordinate Coordinate °/100~ Reviewed By: ~ RECEIVED BP EXPLORATION DAILY DRILLING REPORT: As of 0600 Hrs. Monday, July 9, 1990 WELL: Z-5 (34-13-11-11) PRUDHOE RIG: AUDI #2 Day' 5 Depth at 0600 Hrs. = 5564 72 Hour Footage = 2864 APl No. AFE Number: AFE Amount = Current Field Cost = Estimated Final Cost = 12510 Current Operation' Tripping. Summary of Last 72 Hours' Ran and cemented 10-3/4" casing. Test casing to 3000 psi. 9-7/8" hole to 5564' MD. Dri'lled MudType MUd Weiqht. Viscosity P...V YP. Fluid Loss Solids Temp Dispersed 10 if/gal 38 Sec. 1 5 1 0 4.4 cc 1 0% 86 °F Survey Depth Angle Direction TVD N-S E-W Doa Lea Section Coordinate, Coordinate °/100' Reviewed By' ,sa/ BP EXPLORATION DAILY DRILLING REPORT: As of 0600 Hrs. Tuesday, July 10, 1990 WELL: Z-5 (34-13'11-11) PRUDHOE BAY UNIT RIG: AUDI #2 Day: 6 Depth at 0600 Hrs. = 6521 24 Hour Footage = 957 APl No. AFE Number: AFE Amount = Current Field Cost = Estimated Final Cost = 50-029-22056 12510 Current Operation: POH. Summary of Last 24 Hours: Drilled 9-7/8" hole to 6521' MD. Mud Type Mud Weight .,Viscosity P V Dispersed 10.2 #/gal 40 Sec. 1 6 YP Fluid Loss Solids' Temp 8 3.6 cc 1 2% 84 °F Survey Depth Angle .Direction, N-S E-W ~ TVD. Section Coordinate Coordinate °/100' Reviewed By: sa/ BP EXPLORATION DAILY DRILLING REPORT: PRUDHOE As of 0600 Hrs. Wednesday, July 11, 1990 WELL: Z-5 (34-13-11-11) BAY UNIT RIG: AUDI #2 Day: 7 Depth at 0600 Hrs. = 7440 24 Hour Footage = 919 APl No. AFE Number: AFE Amount = Current Field Cost = Estimated Final Cost = 50-029-22056 12510 Current Operation: Drilling 9-7/8" hole. Summary of Last 24 Hours: Drilled 9-7/8" hole to 7440' MD. Mud Type Mud Weiqht Viscosity P V Dispersed 10.4 #/gal 40 Sec. 1 6 YP Fluid Loss Solids Temp 7 3.4 cc 12.5% 89 °F Survey Depth Angle Direction TVD N-S E-W Doa Lea Section Coordinate Co¢rdina~e °/lO0' Reviewed By: sa/ BP EXPLORATION DAILY DRILLING REPORT: PRUDHOE BAY UNIT As of 0600 Hrs. Thursday, July 12, 1990 WELL: Z-5 (34-13-11-11) RIG: AUDI #2 Day: 8 Depth at 0600 Hrs. = 7940 24 Hour Footage = 500 APl No. AFE Number: AFE Amount = Current Field Cost = Estimated Final Cost = 50-029-22056 12510 Current Operation: Drilling. Summary of Last 24 Hours: Drilled 9-7/8" hole to 7940' MD. Mud Type Dispersed Mud Weight Viscosity P V 10.4 #/gal 41 Sec. 1 5 YP Fluid Loss Solids Temp 7 3.8 cc 1 2% 82 °F Survey Depth Angle Direction N-S E-W Dog Leg TVD Section Coordinate Coordinate °/100' Reviewed By: sa/ BP EXPLORATION DAILY DRILLING REPORT: As of 0600 Hrs. Friday, July 13, 1990 WELL: Z-5 (34-13-11-11) PRUDHOE BAY UNIT RIG: AUDI #2 Day: 9 Depth at 0600 Hrs. = 8699 24 Hour Footage = 759 APl No. AFE Number: AFE Amount = Current Field Cost = Estimated Final Cost = 50-029-22056 125210 Current Operation: Drilling. Summary of Last 24 Hours: Drilled 9-7/8" hole to 8699' MD. Mud Type Dispersed Mud Weight Viscosity P V 10.4 #/gal 40 Sec. 13 YP Fluid Loss Solids Temp 8 3.5 cc 12% 84 °F Survey Depth Angle Direction, N-S I~-W Dog Leg 'I'VD Section Coordinate Coordinate °/100' Reviewed By: sa/ BP EXPLORATION DAILY DRILLING REPORT: As of 0600 Hrs. Monday, July 16, 1990 WELL: Z-5 (34-13-11-11) PRUDHOE BAY UNIT RIG: AUDI #2 Day: 12 Depth at 0600 Hrs. = 7654 72 Hour Footage = 985 AP! No. AFE Number: AFE Amount = Current Field Cost = Estimated Final Cost = 50-029-22056 125236 Current Operation' Rig up to run 3.5" ddll pipe. Summary of Last 72 Hours: Drilled 9-7/8" hole to 9684' MD. Ran and cemented 7-5/8" casi'ng. Mud Type Mud Weight Viscosity P V YP Fluid Loss Solids Temp Dispersed 10.4 #/gal 40 Sec. 14 7 3.6 cc 13% 90 °F Survey Depth Angle Direction TVD N-S ,E-W, Dog Leg Section Coordinate Coordinate °/100' Reviewed By' sa! BP EXPLORATION DAILY DRILLING REPORT: As of 0600 Hrs. Tuesday, July 17, 1990 WELL: Z-5 (34-13-11 -! 1) PRUDHOE BAY UNIT RIG: AUDI #2 Day: 1 3 Depth at 0600 Hrs. = 9732 24 Hour Footage = 48 APl No. AFE Number: AFE Amount = Current Field Cost = Estimated Final Cost = 50-029-22056 125236 Current Operation' Drilling with 6-3/4" bit. Summary of Last 24 Hours' Test BOPs and 7-5/8" casing. Drilled out float equipment. Mud Type Mud Weiqht Viscosity P V YP Fluid Loss Solids Temp Dispersed 9.5 #/gal 35 Sec. 7 5 6.6 cc 7% 80 °F Survey Depth, Angle Direction TVD N-S E-W. Dog Leg Section Coordinate Coordinate °/100' Reviewed By: sa! BP EXPLORATION DAILY DRILLING REPORT: PRUDHOE BAY UNIT As of 0600 Hrs. Wednesday, July 18, 1990 WELL: Z-5 (34-13-11-11) RIG: AUDI #2 Day: 14 Depth at 0600 Hrs. = 10187 24 Hour Footage = 455 AP! No. AFE Number: AFE Amount = Current Field Cost = Estimated Final Cost = 50-029-22056 125236 Current Operation' POH for bit change. Summary of Last 24 Hours' Drilled 6-3/4" hole to 10187' MD. Mud Type, Mud Weight Viscosity P V Dispersed 9.5 #/gal 40 Sec. 11 YP Fluid Loss Solids Temp 8 2.0 cc 1% 102 °F Survey_ Depth Angle Direction. TVD. N-S E-W Ooa Lea Section ,Coordinate ,Coordinate °/100' Reviewed By: sa/ BP EXPLORATION DAILY DRILLING REPORT: PRUDHOE As of 0600 Hrs. Thursday, July 19, 1990 WELL: Z-5 (34-13-11-11) BAY UNIT RIG: AUDI #2 Day: 15 Depth at 0600 Hrs. = 10300 24 Hour Footage = 113 AP! No. AFE Number: AFE Amount = Current Field Cost = Estimated Final Cost = 50-029-22056 125236 Current Operation' Running RFTs. Summary of Last 24 Hours: Drilled 6-3/4" hole to TD of 10300' MD. Ran DIL/BHCS/CNL/GR. Running the RFT. M~JclType Mud Weight Viscosity PV YP Fluid Loss Solids Dispersed 9.5 #/gal 40 Sec. 11 7 4.4 cc 7% Temp 101 OF N-S E-W Doe Lea -- Survey Depth Angl~ Dire(;ti0n TVD Section Coordinate. Coordinate °/100', Reviewed By: sa/ BP EXPLORATION DAILY DRILLING REPORT: As of 0600 Hrs. Friday, July 20, 1990 WELL: Z-5 (34-13-11-11) PRUDHOE BAY UNIT RIG: AUDI #2 Day: 16 Depth at 0600 Hrs. = 10300' 24 Hour Footage = 0' APl No. AFE Number: AFE Amount = Current Field Cost = Estimated Final Cost = 50-029-22056 125236 Current Operation' Waiting on cement truck. Summary of Last 24 Hours: Completed OH logging. Wiper trip. Rigged up and ran 5-1/2" I!.ner. Waiting on cement truck, road blocked by Rig 16. ,. , Mud Type ,. Mud Weight Viscosity Dispersed 9.5 #/gal 42 Sec. Survey De[~th Angle Direction TVD PV YP Fluid Los~ Solids Temp 12 8 4.4 cc 7% 85 °F N-S ~ Doa Lea Section Coordinate Coordinate °/100' Reviewed By: ~ BP EXPLORATION DAILY DRILLING REPORT: As of 0600 Hrs. Monday, July 23, 1990 WELL: Z-5 (34'-13-11-11) PRUDHOE BAY UNIT RIG: AUDI #2 Day: 19 Depth at 0600 Hrs. = 10206 PBTD 72 Hour Footage = 0 APl No. AFE Number: AFE Amount = Current Field Cost = Estimated Final Cost = 50-029-22056 125236 Current Operation' Running CBT/CET logs. Summary of Last 72 Hours: Run and cemented 5-1/2" liner. Clean out liner. Tested liner lap to 3000 psi. Displace with brine. Tested casing with brine to 3000 psi. Running CBT/CET/Gyro. Mud Tv.De Brine Mud Weight .,Viscosity PV yp ~ Solids TemD 9 #/gal Sec. cc 56% 65 °F Survey Depth An(lie -- N-$ E-W Dog Leg Section Coordinate Coordinate .0/100' Reviewed By: sal BP EXPLORATION DAILY DRILLING REPORT: As of 0600 Hrs. Tuesday, July 24, 1990 WELL: Z-5 (34-13-11-11) PRUDHOE BAY UNIT RIG: AUDI #2 Day: 20 Depth at 0600 Hrs. = 10206 PBTD 24 Hour Footage = 0 APl No. AFE Number: AFE Amount = Current Field Cost = Estimated Final Cost = Current Operation' POH with guns. Summary of Last 24 Hours' Finished cement bond logs and gyro run. guns. ,, Mud Type Mud Weight Viscosity P V YP Brine 9 #/gal Sec. 50-029-22056 125236 RIH and perforate. Fluid LO$~ Solids cc 95% P(~H with Temp 68 OF Survey Deoth Angle Direction TVD N-S E-W Section Coordinate Coordinate Dog Leg o/100, Reviewed By: sal BP EXPLORATION DAILY DRILLING REPORT: PRUDHOE BAY UNIT As of 0600 Hrs. Wednesday, July 25, 1990 WELL: Z-5 (34-13-11-11) RIG: AUDI #2 Day: 21 Depth at 0600 Hrs. = 24 Hour Footage = 0 10206 APl No. AFE Number: AFE Amount = Current Field Cost = Estimated Final Cost = 50-029-22056 125236 Current Operation: RIH with WD packer and set. Summary of Last 24 Hours: RIH with casing scrapper, wipe perfs. Run CCL and gage dng. RIH w/ WD packer, MYdType Mud Weight ..V.i~cosity P V YP. Flvid Loss Solids Temp. Brine 9 #/gal Sec. cc 68 °F Survey Depth Ana!e Direction TVD - _ N-S E-VV Doa Lea -- -- Section Coordinate goordina~;(~ ~/10,0' Reviewed By: sal BP EXPLORATION DAILY DRILLING REPORT: PRUDHOE As of 0600 Hrs. Thursday, July 26, 1990 WELL: Z-5 (34-13-11-11) BAY UNIT RIG: AUDI #2 Day: 22 Depth at 0600 Hrs. = 10200 24 Hour Footage = 0 APl No. AFE Number: AFE Amount = Current Field Cost = Estimated Final Cost = 50-029-22056 125236 Current Operation: Displace with diesel. · Summary of Last 24 Hours: Set 5-1/2" WD packer. RIH with 3-1/2" tubing. Test tree to 5000 psi. Displace with 90 bbl. of diesel, freeze protect annulus. Mud Type Mud Weight Viscosity NaCI 9.0 #/gal Sec. , , , Survey Deoth Angle Direction TVD. P V YP. Fluid L0S.~. Solids. Temp cc OF N-S E-W Doa Lea Section Coordina. te Coordinate °/100' Reviewed By: sal BP EXPLORATION DAILY DRILLING REPORT: As of 0600 Hrs. Friday, July 27, 1990 WELL: Z-5 (34-13-11-11) PRUDHOE BAY UNIT RIG: AUDI #2 Day: 23 Depth at 0600 Hrs. = 10210 PBTD 24 Hour Footage = 0 APl No. AFE Number: AFE Amount = Current Field Cost = Estimated Final Cost = 5O-O29-22O56 125236 Current Operation' Rig release. Summary of Last 24 Hours: Freeze protect tree. Released rig at 10:00 hrs. on 7/26/90. ,MudType Mud Weight Viscosity P V. YP Fluid Los,s_ Solids #/gal Sec. cc Survey Depth Angle N-S, E-W TVD Section ~,,oordinate Coordinate Temp oF Dog Leg ,o/100' Reviewed By' sa/ Teleco Oilfield Se, ,s of Alaska Inc. 6116 Nielson Way Anchorage, AK 99502 (907) 562-2646 July 25, 1990 JOB #767 BP EXPLORATION (ALASKA) INC. WELL: Z-05 EILEEN WEST END RIG: AUD #2 Attached please find a copy of the computer calculated MWD directional surveys for the above mentioned well. Teleco appreciates this opportunity to provide service to BP Exploration (Alaska) Inc. Teleco is committed to providing the highest quality MWD Service and we would welcome any comments or questions concerning these surveys or any of our other services. Sincerely, ~~~.~~ Jonathan G. Mapes Field Operations Supervisor JGM/el Enclosures Date.. A ,~'~T COMPANY TELECO OILFIELD SERVICES SURVEY CALCULATIONS Company: Well: Location: Rig: BP EXPLORATION Z-05 EILEEN WEST END AUD # 2 TELECO Job # Grid Correction: Magnetic Declination: Total grid correction: PropoSed Direction: 767TAK 0.0° 30.0° 30.0° 301.6° MINIMUM CURVATURE CALCULATION Meas Course True Vertical Coordinates Closure Dog Leg Depth Length Incl Azi Vert. Dp. Section N/S E/W Distance Angle Severity feet feet deg deg feet feet feet feet feet deg deg/100' ******************************************************************************************************* 2467 0 0.3 33.0 2466.96 4.17 6.48N 0.91W 6.54 N 7.99W 0.00 TIE INTO SINGLE SHOT GYRO 2877 410 0.4 176.3 2876.96 3.32 5.80N 0.33W 5.81 N 3.26W 0.15 3021 144 2.4 300.0 3020.92 6.05 6.81N 2.91W 7.40 N 23.14W 1.84 3116 95 5.1 302.5 3115.71 12.26 10.07N 8.19W 12.98 N 39.13W 2.85 3209 93 6.9 300.7 3208.19 21.98 15.15N 16.48W 22.39 N 47.42W 1.95 PAGE 1 Company: BP EXPLORATION, Well: Z-05, Location: EILEEN WEST END, Riq: AUD #2 Meas Course True Vertical Coordinates Closure Dog Leg Depth Length Incl Azi Vert. Dp. Section N/S E/W Distance Angle Severity feet feet deg deg feet feet feet feet feet deg deg/100~ ******************************************************************************************************* 3303 94 9.3 303.2 3301.25 35.22 22.19N 27.70W 35.49 N 51.30W 2.58 3397 94 11.3 30.1.1 3393.73 52.02 31.11N 41.94W 52.22 N 53.44W 2.16 3491 94 13.1 300.7 3485.60 71.88 41.30N 58.99W 72.01 N 55.00W 1.92 3585 94 15.9 298.2 3576.60 95.39 52.83N 79.50W 95.45 N 56.40W 3.05 3679 94 19.0 293.7 3666.26 123.42 65.07N 104.87W 123.42 N 58.18W 3.60 3774 95 20.9 293.3 3755.56 155.51 77.99N 134.60W 155.57 N 59.91W 1.99 3866 92 23.2 295.8 3840.82 189.79 92.37N 166.00W 189.97 N 60.91W 2.70 3961 95 25.1 298.2 3927.51 228.52 110.04N 200.60W 228.80 N 61.25W 2.25 4055 94 27.1 297.2 4011.92 269.77 129.25N 237.22W 270.15 N 61.42W 2.18 4149 94 29.8 297.5 4094.56 314.43 149.83N 276.99W 314.92 N 61.59W 2.88 4254 105 30.9 292.6 4185.18 367.09 172.24N 325.03W 367.85 N 62.08W 2.58 4349 95 31.4 292.3 4266.48 415.61 191.00N 370.45W 416.79 N 62.72W 0.55 4443 94 31.7 291.9 4346.59 464.12 209.51N 416.02W 465.80 N 63.27W 0.39 4538 95 32.5 291.2 4427.07 513.82 228.05N 462.98W 516.09 ~ 63.78W 0.93 PAGE 2 Company: BP EXPLORATION, Well: Z-05, Location: EILEEN WEST END, Riq: AUD ~2 Meas Course True Vertical Coordinates Closure Dog Leg Depth Length Incl Azi Vert. Dp. Section N/S E/W Distance Angle Severity feet feet deg deg feet feet feet feet feet deg deg/100' ******************************************************************************************************* 4631 93 33.0 290.9 4505.28 563.29 246.12N 509.94W 566.22 N 64.24W 0.58 4725 94 33.4 291.2 4583.93 613.90 264.61N 557.98W 617.54 N~64.63W 0.45 4819 94 33.6 290.9 4662.31 664.90 283.24N 606.40W 669.29 N 64.96W 0.27 4913 94 33.5 291.2 4740.65 715.97 301.90N 654.88W 721.12 N 65.25W 0.21 5007 94 33.1 291.2 4819.22 766.73 320.57N 703.00W 772.64 N 65.49W 0.43 5109 102 33.2 290.9 4904.62 821.57 340.60N 755.05W 828.32 N 65.72W 0.19 5202 93 33.2 291.6 4982.44 871.66 359.06N 802.51W 879.17 N 65.90W 0.41 5296 94 33.0 291.6 5061.18 922.22 377.96N 850.25W 930.47 N 66.03W 0.20 5390 94 32.8 291.6 5140.10 972.51 396.76N 897.73W 981.49 N 66.16W 0.22 5484 94 32.3 292.3 5219.33 1022.37 415.66N 944.64W 1032.04 N 66.25W 0.67 5586 102 32.2 291.2 5305.60 1075.99 435.83N 995.19W 1086.44 N 66.35W 0.58 5679 93 32.7 290.9 5384.08 1125.05 453.75N 1041.76W 1136.29 N 66.46W 0.56 5773 94 33.1 290.9 5463.00 1175.22 471.96N 1089.46W 1187.29 N 66.58W 0.43 PAGE 3 Company: BP EXPLORATION, Well: Z-05, Location: EILEEN WEST END, Riq: AUD ~2 Meas Course True Vertical Coordinates Closure Dog Leg Depth Length Incl Azi Vert. Dp. Section N/S E/W Distance Angle Severity feet feet deg deg feet feet feet feet feet deg deg/100' 5866 93 33.6 290.5 5540.69 1225.43 490.03N 1137.28W 1238.36 N 66.69W 0.59 5960 94 34.2 290.5 5618.71 1276.87 508.39N 1186.39W 1290.73 N 66.80W 0.64 6054 94 34.5 290.9 5696.32 1328.95 527.14N 1236.01W 1343.72 N 66.90W 0.40 6147 93 34.9 290.9 5772.78 1380.98 546.03N 1285.47W 1396.63 N 66.99W 0.43 6244 97 35.2 291.2 5852.18 1435.74 566.04N 1337.45W 1452.30 N 67.06W 0.36 6336 92 35.2 291.9 5927.36 1487.96 585.52N 1386.78W 1505.32 N 67.11W 0.44 6428 92 35.0 292.3 6002.63 1540.14 605.42N 1435.80W 1558.22 N 67.14W 0.32 6524 96 34.7 292.6 6081.41 1594.31 626.37N 1486.50W 1613.08 N 67.15W 0.37 6617 93 34.9 293.3 6157.77 1646.78 647.07N 1535.38W 1666.16 N 67.15W 0.48 6711 94 35.2 293.7 6234.73 1700.22 668.60N 1584.88W 1720.14 N 67.13W 0.40 6804 93 35.1 294.0 6310.77 1753.28 690.25N 1633.85W 1773.67 N 67.10W 0.22 6898 94 35.3 294.7 6387.58 1807.03 712.59N 1683.21W 1827.84 N 67.05W 0.47 6992 94 35.2 295.8 6464.34 1860.94 735.74N 1732.28W 1882.05 N 66.99W 0.68 PAGE 4 .ComDan¥: BP EXPLORATION, Well: Z-05, Location: EILEEN WEST END, Riq: AUD #2 Meas Course True Vertical Coordinates Closure Dog Leg Depth Length Incl Azi Vert. Dp. Section N/S E/W Distance Angle Severity feet feet deg deg feet feet feet feet feet deg deg/100' ******************************************************************************************************* 7086 94 34.5 295.8 6541.48 1914.38 759.11N 1780.64W 1935.70 N 66.91W 0.74 7180 94 35.0 296..8 6618.72 1967.74 782.86N 1828.68W 1989.20 N 66.82W 0.81 7274 94 35.3 296.8 6695.57 2021.67 807.26N 1876.99W 2043.22 N 66.73W 0.31 7366 92 35.6 297.2 6770.51 2074.86 831.49N 1924.53W 2096.47 N 66.63W 0.41 7450 84 36.4 298.9 6838.47 2124.14 854.71N 1968.10W 2145.68 N 66.53W 1.52 7544 94 36.7 299.3 6913.99 2180.06 881.93N 2017.01W 2201.39 N 66.38W 0.41 7638 94 37.1 300.4 6989.16 2236.47 910.03N 2065.96W 2257.50 N 66.23W 0.82 7737 99 37.5 302.5 7067.91 2296.46 941.33N 2117.13W 2316.96 N 66.03W 1.35 7825 88 38.0 303.2 7137.49 2350.32 970.56N 2162.39W 2370.21 N 65.83W 0.76 7926 101 37.4 303.5 7217.40 2412.07 1004.51N 2213.99W 2431.21 N 65.60W 0.63 8019 93 37.1 303.5 7291.42 2468.33 1035.58N 2260.93W 2486.81 N 65.39W 0.32 8114 95 36.6 304.2 7367.44 2525.26 1067.32N 2308.25W 2543.06 N 65.18W 0.69 8208 94 36.5 304.9 7442.96 2581.16 1099.06N 2354.35W 2598.25 N 64.98W 0.46 PAGE 5 Company: BP EXPLORATION, Well: Z-05, Location: EILEEN WEST END, Riq: AUD #2 Meas Course True Vertical Coordinates Closure Dog Leg Depth Length Incl Azi Vert. Dp. Section N/S E/W Distance Angle Severity feet feet deg deg feet feet feet feet feet deg deg/100' ******************************************************************************************************* 8300 92 36.5 305.6 7516.91 2635.77 1130.65N 2399.04W 2652.13 N 64.77W 0.45 8395 95 35.9 306.7 7593.58 2691.70 1163.74N 2444.35W 2707.24 N 64.54W 0.93 8488 93 35.2 307.0 7669.24 2745.54 1196.17N 2487.62W 2760.26 N 64.32W 0.78 8665 177 34.7 306.7 7814.32 2846.52 1256.99N 2568.75W 2859.80 N 63.93W 0.30 8758 93 34.7 307.0 7890.78 2899.23 1288.74N 2611.11W 2911.83 N 63.73W 0.19 8853 95 34.6 310.2 7968.94 2952.83 1322.43N 2653.31W 2964.60 N 63.51W 1.91 8946 93 34.5 312.3 8045.54 3004.82 1357.20N 2692.96W 3015.63 N 63.25W 1.29 9041 95 33.2 312.7 8124.43 3056.78 1392.95N 2731.97W 3066.59 N 62.98W 1.39 9135 94 32.3 312.7 8203.49 3106.68 1427.44N 2769.34W 3115.58 N 62.73W 0.96 9227 92 32.3 311.6 8281.25 3155.01 1460.42N 2805.79W 3163.11 N 62.50W 0.64 9321 94 32.7 312.7 8360.53 3204.66 1494.32N 2843.23W 3212.00 N 62.27W 0.76 9415 94 33.1 314.4 8439.46 3254.61 1529.50N 2880.23W 3261.15 N 62.03W 1.07 9510 95 32.6 315.8 8519.27 3304.71 1565.99N 2916.61W 3310.43 N 61.77W 0.96 PAGE 6 Company: BP EXPLORATION, Well: Z-05, Location: EILEEN WEST END, Riq: AUD #2 Meas Course True Vertical Coordinates Closure Dog Leg Depth Length Incl Azi Vert. Dp. Section N/S E/W Distance Angle Severity feet feet deg deg feet feet feet feet feet deg deg/100' ******************************************************************************************************* 9609 99 31.4 317.9 8603.23 3355.32 1604.25N 2952.49W 3360.18 N 61.48W 1.65 PAGE 7 2OO0 TB CO O lf eld SepvAce"- VERTICAL PROUECTION 0 1000 2000 3000 4000 5000 6000 3000 4000 ~5000 °6000 ~70oo BO00 9OO0 10000 11000 2467 ' .25 deg BP EXPLORATION 2877 ' .4 deg Z--05 31~6 ' 5.1 deg EILEEN WEST END 3397' lj.3 deg AUD #2 JOB# 767TAK/O0 3679 ' 19.01 deg SCALE: -~k3961' 25.1 aeg ] inch = 1000 feet xk4254 , 30.9 deg 4538 ' 32.5 deg 4819 ' 33.6 deg %5~09 ' 33.2 deg -~5390 ' 32.8 deg -~5679 ' 32.7 N5960 ' 34.2 ~eg k,6244 ' 35.2 6524 ' 34.7 Oeg 6804 ' 35.1 Oeg 7086 ' 34.5 7366 ' 35.6 deg 7638 ' 37.1 deg 7926 ' 37.4 Oeg %8208 ' 36.5 -~8488 ' 35.2 deg 8758 ' 34.7 -~9041 ' 33.2 deg VERTICAL SECTION (ft) TE ~CO O~lf~eld PLAN VIE~/ Ser'v ~.c, 7200 4800 BP EXPLORATION Z-05 EILEEN NEST END AUD #2 JOB# 767TAK/O0 SCALE: 1 inch = 800 feet + 9609 'kaL 9415 '% 8946 '~+ 8488 7366~+ 6711 5960 4000 3200 2400 1600 800 0 NEST (ft) 6400 56OO 4800 4000 z 0 32oo C 2400 ~600 800 ?o-?~ SUB- SURFACE DIRECTIONAL SURVEY ~-~ UIDANCE ~'10NTINUOUS ~ OOL i) Company BP EXPLORATION Well Name z-5 (34-13-11-11)(975, SNL,3930' WEL,SEC 19, TllN,R12E) Field/Location PRUDHOE BAY f NORTH SLOPE, ALASKA Job Reference No. 74003 Logged By: SARBER Date 23-JUL-90 Computed By: KRUWELL GCT DIRECTIONAL SURVEY CUSTOMER LISTING FOR BP EXPLORATION Z-5 C34.-13-11-11) PRUDHOE BAY NORTH SLOPE~ ALASKA SURVEY DATE: Z3-JUL-1990 ENGINEER: G. SARBER METHODS OF COMPUTATION TOOL LOCATION: TANGENTIAL- AVERAGED DEVIATION AND AZIHUTH INTERPOLATION: LINEAR VERTICAL SECTION: HORIZ. DIST. PROJECTED ONTO A TARGET AZIMUTH OF NORTH 6! DEG 38 MIN WEST COMPUTATION DATE: 1T-AUG-90 PAGE I BP EXPLORATION Z-5 (34-13-11-11) PRUOHOE BAY NORTH SLOPE~ ALASKA DATE OF SURVEY: 23-JUL-1990 KELLY BUSHING ELEVATION: 92.51 FT · ENGINEER: G. SARBER INTERPOLATED VALUES FOR EVEN 100 FEET OF MEASURED DEPTH TRUE SUB-SEA COURSE MEASURED VERTICAL VERTICAL DEVIATION AZIHUTH DEPTH DEPTH DEPTH DEG MIN DEG MIN VERTICAL DOGLEG RECTANGULAR COORDINATES HDRIZ. DEPARTURE SECTION SEVERITY NORTH/SOUTH EAST/NEST DIST. AZIMUTH FEET DEG/IO0 FEET FEET FEET DEG 0.00 0.00 -92.51 0 0 N 0 0 E 100.00 100.00 7.49 0 6 S 25 19 E ZO0.O0 200.00 107.49 0 4 N 27 33 E 300000 300.00 Z07o49 0 3 S 88 29 400.00 400.00 307.49 0 3 S 10 21 E 500.00 500.00 407.49 600.00 600.00 507.49 0 700.00 700.00 607.49 0 2 N 35 35 E 800.00 800.00 707.49 0 4 S 61 0 900.00 900.00 807.49 0 8 S 21 36 E 0.00 0.00 0.00 N 0.00 E -O.ZO 0.08 0.44 S 0.01 Id -0.30 0.00 0.44 S 0.10 E -0.14 0.00 0.37 S 0.07 E -0.20 0.00 0.43 S 0.01 Id -0.22 0.00 0.41 S 0.03 E -0.16 0.00 0.41 S 0.04 bt -0.20 0.10 0.45 S 0.02 Id -0.13 0.17 0.41 S 0.07 bi -0.20 0.00 0.59 S 0.10 Id 0.00 N 0 0 E 0.44 S I 42 Id 0.45 S 13 6 E 0.37 S 11 2 E 0.43 S 0 40 Id 0.41 S 4 Z E 0.41 S 5 54 ~1 0.45 S Z 37 td 0.42 S 9 46 Id 0.60 S 9 23 kl 1000.00 1000.00 907.49 1100.00 1100.00 1007.49 1200.00 1200.00 1107.49 1300.00 1299.99 1207.48 1400000 1399.99 1307.48 1500.00 1499.99 1407.48 1600000 1599.98 1507.47 1700.00 1699.97 1607046 1800.00 1799097 1707046 1900000 1899.97 1807046 0 3 N 17 39 E 0 14 S 15 13 E 0 25 S 55 38 E 0 15 S 81 27 E 0 29 S 83 32 E 043 S 8923 E 036 N 88 2 E 0 30 S 88 9 E 0 14 S 84 19 E 0 30 S 79 I E -0032 0.00 0.67 S 0.00 -0.32 0.54 0.73 S 0.03 -0.89 0.39 1.21 S 0.35 -1.41 0.47 1.41 S 0.85 -1.98 0.69 1.45 S 1.47 -3o01 0.00 1.51 S 2.61 -4.05 0.11 1.49 S 3.80 -4.90 0.22 .::' 1.50 S 4.76 -5.45 0.19 1.51 S 5.38 -6.11 0.34 1.68 S 6.04 0.67 S 0 8 bi 0.73 S 2 14 Id 1.27 S 16 15 E 1.64 S 31 I E 2.07 S 45 23 E 3.01 S 59 55 E 4.08 S 68 37 E 4.99 S 71 33 E 5.59 S 74 19 E 6.27 S 74 29 E 2000.00 1999.97 1907.46 2100o00 2099.97 2007.46 2200.00 2199.96 2107.45 2300.00 2299.96 2207.45 2400.00 1399.96 2307.45 2500o00 2499.96 2407.45 2600.00 2599096 2507.45 2700.00 2699.96 2607045 2800.00 2799.96 2707.45 1900000 2899.96 2807.45 0 21 S 82 55 E 0 16 S 77 13 E 0 22 S 71 26 E 0 10 S 34 32 E 0 24 S 27 41 E 0 15 S 38 21 E 0 7 S 15 32 E 0 15 S 3 30 E 0 7 S I 21E 0 15 S 16 55 Id -6.78 0.20 1.80 S 6.73 E -7.28 0.19 1.86 S 7.27 E -7.94 0.20 2.07 S 7.91 E -8.35 0.07 Z.2Z S 8.29 E -8.75 0.00 2.67 S 8.50 E -9.19 0.06 3.20 S 8.84 E -9.55 0.00 3.43 S 9.00 E -9.76 0.03 3.87 S 9.01 E -9.93 0.00 4.14 S 9.05 E -10.00 0.47 4.34 S 9.01 E 6.97 S 75 0 E 7.51 S 75 37 E 8.18 S 75 ZO E 8.58 S 75 I E 8.91 S 72 34 E 9.40 S 70 7 E 9.63 S 69 7 E 9.80 S 66 46 E 9.95 S 65 26 E 10001 S 64 19 E 3000.00 2999.96 2907.45 0 58 3100.00 3099.82 3007.31 4 22 3100.00 3199.35 3106.84 6 39 3300000 3298.40 3205.89 9 11 3400.00 3396.74 3304.23 11 23 3500.00 3494.43 3401.92 13 30 3600.00 3591.02 3498.51 16 33 3700.00 3686.01 3593.50 19 38 3800000 3779.57 3687.06 21 35 3900000 3871.80 3779029 13 52 N 85 50 Id -9.81 4.41 N 58 19 bi -4082 3.55 N 59 34 # 4.79 2.24 N 57 5 Id 18.44 3.28 N 59 44 Id 36.47 1.80 N 60 28 Id 57083 2.74 N 63 14 Id 83.64 3.81 N 67 4g W 114.77 2.86 N 67 30 W 149.82 2.25 N 63 49 ~ 188.35 2.35 4.74 S 8.59 E 9.81 S 61 6 E 2.44 S 4.16 E 4.82 S 59 38 E 2.57 N 4.05 Id 4.80 N 57 40 Id 9056 N 15.79 Id 18.46 N 5~ 49 Id 19.19 N 31.09 Id 36.53 N 58 19 kl 29.82 N 49.63 M 57.90 N 59 0 Id 41.98 N 72.39 M 83.68 N 59 54 ~1 54.82 N 100.83 Id 114.77 N 61 28 W 68.02 N 133.54 Id 149.87 N 63 0 H 83.95 N 168.71 Id 188.45 N 63 33 Id COHPUTATION DATE: 17-AUG-90 PAGE 2 BP. EXPLORATION Z-5 (34-13-11-11) PRUDHOE BAY NORTH SLOPEr ALASKA DATE OF SURVEY: Z3-JUL-1990 KELLY BUSHZNG ELEVATION: 9Z.51 FT INTERPOLATED VALUES FOR EVEN 100 FEET OF MEASURED DEPTH TRUE SUB-SEA COURSE NEASURED VERTICAL VERTICAL DEVIATION AZINUTH OEPTH DEPTH DEPTH DEG'MIN ~ DEG 4000.00 3962053 3870.02 ~25 57 4100.00 4051.66 3959.15 Z7 57 4200.00 4138o77 4046.26 30 32 4300000 4224.58 4132.07 31 9 4400.00 4309.95 4217.44: 31 35 4500.00 4394.95 4302.44 32 6 4600.00 4479.19 4386.68 32 59 4700.00 4562.92 44,70.41 33 16 4800.00 4646.39 4553.88 33 33 4900.00 4729.67 4637.16 33 32 N 63 1Z kl N 65 7 g N 66 36 ~1 N 69 6 tJ N 69 18 g N 69 Z4 g N 69 43 kl N 6942 bi N 70 21 bi N 7042 g 5000.00 4813.24 67Z0.73 33 2 5100.00 4897006 4804.53 33 5 5200.00 4980084 4888.33 33 6 5300.00 5064.73 4972.22 32 49 5400.00 5168.88 5056.37 32 34 ENGINEER: G. SARBER N 70 47 bi N 70 42 bi N 70 28 W N 70 9 g N 69 51 M VERTICAL DOGLEG RECTANGULAR COORDINATES:HORZZ. DEPARTURE SECTION SEVERITY NORTH/SQUTH EAST/gEST DIST. AZIMUTH FEET DEG/IO0 FEET FEET FEET DEG 230.38 2 275.67 2.36 324064 2099 375065 0056 427.27 0o41 479.47 1.16 532.84 0.54 586.98 0.27 641.45 0 696.15 0.57 750.36 0.61 804.24 0.46 858.14 0.24 911.96 0o31 965.40 0.14 102090 N 206025 g 230.50 N 63 29 1Z2.66 N 247005 ~ 275.83 N 63 36 143014 N 291.65 g 324.88 N 63 52 162.23 N 339.31 ~ 376.10 N 64 27 180071 N 388.00 M 428.02 N 65 2 199.28 N 437.29 g 480.56 N 65 30 / 218.13 N 487.78 bi 534.33 N 65 54 237.10 N 539.06 g 588.90 N 66 15 255.91 N 590.81 g 643.85 N 66 35 274.34 N 643.02 ~ 699.10 N 66 54 292.¢2 N 694-87 ~ 753.89 N 67 11 N 310.45 N 746.37 M 808.36 N 67 25 W 328.56 N 797.85 g 862.85 N 67 37 W 346.92 N 849.09 W 917.23 N 67 47 H 365.43 N 899.84 ~ 971.21 N 67 54 H 5500.00 5233.27 5160.76 32 6 5600.00 5318.06 5225.55 32 9 5700.00 5402.51 5310.00 32 39 5800000 5486.65 · 5393.94 33 10 5900.00 5569.94 5477043 33 41 6000.00 5652.86 5560°35 34 16 6100.00 5735.32 564Z.81 34 35 6200.00 5817.49 5724.98 34 55 6300.00 5899.28 5806.77 35 11 6400.00' 5981o15 5888.64 34 55 6500.00 6063.33 5970.82 34 32 6600.00 6145.73 6053.22 34 42 6700.00 6227.61 6135.10 35 10 6800.00 6309.50 6216.99 34 58 6900.00 6391.39 6298.88 35 11 7000.00 6473.13 6380.62 34 54 7100.00 6555.48 646Z.97 34 25 7200.00 6637.73 6545.22 34 55 7300.00 6719.56 6627.05 35 11 7400000 6801.04 6708053 35 47 7500000 6881.T6 6789.25 36 28 7600.00 6962001 6869.50 36 50 7700.00 7041.96 6969.45 37 3 7800.00 7121.39 7028.88 37 42 7900.00 7ZOOoSZ 7108.01 37 28 N 69 42 U 1018.51 N 69 36 M 1071.01 N 69 56 g 1124.04 N 70 1Z ~ 1177.79 N 70 15 W 1Z32.22 N 70 24 g 1Z87.48 N 70 35 bi 1343.37 N 70 28 M 1399.67 N 69 53 ~ 1456.57 N 69 35 ~ 1513.42 N 69 10 ~ 1569.87 N 68 19 g 1626.09 N 67 40 W 1683.15 N 67 4 M 1740.25 N 66 27 bi 1797.62 N 65 49 M 1856.84 N 65 20 W 1911.45 N 64 45 ~ 1968.23 N 64 32 g 2025.62 N 63 27 ~ 2083.55 N 62 33 g 2142.56 N 61 45 ~ 2202.21 N 60 25 W 226Z.28 N 58 41 ~ 2322.99 N 57 44 M 2384.02 0.97 0.48 0064 0046 0.68 0.55 0.33 0.71 0.54 0.25 0.71 0.93 O.8Z 0.38 0.70 1.21 0.45 0.28 O.6Z 1.21 0.51 0.82 1.Z4 lo14 0.94 383.98 N 950.18 W 1024.83 N 68 0 M 402.46 N 999.87 M 1077.83 N 68 4 M ,:'420.99 N 1050.12 ~ 1131.36 N 68 9 g 439.51 N 1101.21 g 1185.68 N 68 15 N ¢58.16 N 1153.00 ~1 1240.TO N 68 ZO ~t 476.98 N 1205o63 ~ 1296.56 N 68 25 g 495088 N 1258.95 ~ 1353.09 N 68 30 g 514.83 N 1312.70 # 1410.05 N 68 35 W 534.33 N 1366.84 ~1 1467.57 N 68 39 kl 554.Z6 N 1420.68 g 1,526o97 N 68 41 I~ 574.Z7 N 1474.03 1~ 1581.94 N 68 43 ~ '~ 594.83 N 1526.82 ~1 1638.60 N 68 43 ~1 616035 N 1580.05 M 1696.01 N 68 41 g 638.44 N 1633.02 g 1753.38 N 68 39 I~ 661-07 N 1685.76 g 1810.75 N 68 35 ki 684.41 N 1738.43 M 1868.30 N 68 31 ~1 707.86 N 1790.09 kl 1924.97 N 68 25 bi 731.98 N 1841.61 ~i 1981.74 N 68 19 ~1 756.51 N 1893.58 ~ 2039.10 N 68 13 bi 781.95 N 1945.67 M 2096092 N 68 6 ~1 808.81 N 1998.24 'd Z155.72 N 67 58 kl 836.64 N 2051.00 d 2215.08 N 67 49 ~1 865.68 N Z103.59 kl 2274.75 N 67 38 ~1 896.44 N 2155.97 M 2334.92 N 67 25 bi 928.74 N 2207.89 M 2395.27 N 67 11 ~ COMPUTATION DATE: 1T-AUG-90 PAGE 3 BP EXPLORATION Z-S C34-13-11-11) PRUOHOE BAY NORTH SLOPE9 ALASKA DATE OF SURVEY: 23-JUL-1990 KELLY BUSHING ELEVATION: 92.51 FT ENGINEER: G. SARBER INTERPOLATED VALUES FOR EVEN 100 FEET OF MEASUREO DEPTH TRUE SUB-SEA COURSE MEASURED VERTICAL VERTICAL DEVIATION AZIMUTH DEPTH DEPTH DEPTH DEG #IN DEG WIN VERTICAL DOGLEG RECTANGULAR COORDINATES HORIZ. DEPARTURE SECTION SEVERITY NORTH/SOUTH EAST/WEST DIST. AZIMUTH FEET DEG/IO0 FEET FEET FEET OEG RIM 8000-00 7280.20 7187.69 36 S8 8100.00 7360.28 7267.77 36 33 8200.00 '?440.68 7348.17 36 24 8300.00 7521.19 7428.68 36 21 8400.00 T60Z.06 7509.55 35 42 8500.00 7683.57 7591.06 35 4 8600.00 7765.73 7673.22 34 29 8700.00 7847.99 7755.48 34 45 8800.00 7930.15 7837.64 34 37 8900.00 8012.42 7919.91 34 37 9000.00 8094.97 8002.46 33 52 9100.00 8178.58 8086.07 32 44 9200.00 8263.16 8170.65 32 9 9300.00 8347.59 8255.08 32 38 9400.00 8431.48 8338.97 33 17 9500.00 8515.38 8422.87 32 40 9600.00 8600.04 8507.53 31 33 9700.00 8685.94 8593.43 30 4 9800.00 8772.58 8680.07 29 49 9900.00 8859.36 8766.85 30 8 10000.00 8944.83 8852.32 32 27 10100.00. 9028.16 8935.65 34 47 10200.00 9109.28 9016.77 36 15 10300.00 9189.93 9097.42 36 15 N 57 40 W 2444.29 N 57 42 g 2504.04 N 57 14 g 2563.35 N 56 30 ~ 2622.46 N 55 47 ~ 2681.00 N 55 1.5 g 2738.61 N 54 36 ¥ 2795.22 N 54 12 ~ 2851.63 N 53 10 M 2908.09 N 50 45 W 2964.14 N 49 36 W 3019.42 N 49 5 I,I 3073.01 N 48 58 ~1 3125.08 N 48 33 M 3177.32 N 47 29 t,I 3230.19 N 46 42 g 3282.89 N 44 33 I,I 3334.04 N 42 51 I,I 3382.70 N 43 19 I,I 3430.01 N 45 49 i,I 3477-52 N 46 56 g 3527.62 N 47 16 g 3581.11 N 48 17 N 3637.89 N 48 17 W 3695.41 0.24 0 0.91 0.36 0.47 0.52 0.68 0.60 0.99 1.29 1.20 1.25 0.35 0.77 1.90 1.25 1.71 1.16 0.83 2.08 2.31 2.85 0.00 0.00 961.07 N 2258.93 W 2454.88 N 66 57 g 993.08 N 2309.55 M 2514.01 N 66 44 1025.08 N 2359.67 W 2572.71 N 66 31 1057.54 N 2409.32 W 2631.20 N 66 18 1090.31 N 2458.16 g 2689.11 N 66 5 1123.14 N 2505.90 g 2746.08 N 65 51 1155.87 N 2552.56 g 2802.08 N 65 38 1189.02 N 2598.77 g 2857.86 N 65 25 1222.73 N 2644.74 ~ 2913.71 N 65 11 M 1257.72 N 2689.53 W 2969.08 N 64 56 1293.97 N 2732.79 ~ 3023.65 N 64 40 W 1329.72 N 2774.38 W 3076.58 N 64 24 N 1364.73 N 2814.65 g 3128.06 N 64 8 ~ 1400.01 N 2854.97 ~ 3179.76 N 63 53 W 1436.49 N 2895.37 M 3232.13 N 63 37 W 1473.50 N 2935.27 ~ 3284.36 N 63 21 W 1510.69 N 2973.32 ~ 3335.08 N 63 4 e 1'547.82 N 3008.57 g 3383.37 N 62 47 W 1584.33 N 3042.62 M 3430.40 N 62 30 M 1619.70 N 3077.52 M 3477.72 N 62 15 N 1655.44 N 3115.15 N 3527.70 N 62 I W 1693.07 N 3155.63 ~ 3581.13 N 61 47 W 1732.32 N 3198.96 g 3637.89 N 61 34 g 1771.67 N 3243.08 ~ 3695.46 N 61 21 g COHPUTATION DATE: 17-AUG-90 PAGE BP EXPLORATION Z-5 (34-13-11-11) PRUDHOE.BAY NORTH SLOPE~ ALASKA DATE OF SURVEY: 23-JUL-1990 KELLY BUSHING ELEVATION: 9Z051 FT ENGINEER: Go SARBER INTERPOLATED VALUES FOR EVEN 1000 FEET OF HEASUREO DEPTH TRUE SUB-SEA COURSE VERTICAL DOGLEG ?RECTANGULAR CDORDINATES:~ HDRIZ. OEPARTURE HEASURED VERTICAL VERTICAL DEVIATION AZIHUTH SECTION SEVERITY NORTH/SOUTH EAST/MEST DIST. AZIHUTH DEPTH DEPTH DEPTH iDEG #IN DEG HIN FEET DEG/IO0 FEET FEET FEET DEG NIN 0o00 0.00 -9Z.51 0 0 1000.00 1000.00 907.49 0 3 ZO00.O0 1999.97 1907.46 0 21 3000.00 Z999.96 2907°45 0 58 4000000 3962053 3870.02 Z5 57 5000.00 4813.24 4720.T3 33 2 6000.00 56.52086 5560035 34 16 TO00.O0 64T3.13 6380062 34 54 8000000"7280.20 7187069 36 58 900000.0 8094.9T 8002046 33 52 N 0 0 E 0o00 N 17 39 E -0032 S 82 55 E -6°78 N 85 50 bi -9.81 N 63 12 bi 230038 N TO 47 bi 750.36 N 70 24 bi 128T.48 g 65 49 bi 1854.8¢ N 57 40 g 2444029 N 49 36 W 3019042 0o00 0000 0020 4.41 2 o41 0.61 0o55 1.21 O024 1020 0.00 N 0o00 E 0o00 N 0 0 E 0067 S 0.00 bi 0067 S 0 8 W 1.80 S 6.73 E 6.97 S 75 0 E 4°74 S 8°59 E 9o81 S 61 6 E 102090 N 206.25 g 230-50 N 63 29 W ~ 292o4Z N 69¢°87 W 753-89 N 67 11 ~ / 476°98 N 1205063 bi 1296.56 N 68 25 ~ 684.41 N 1738.43 W 1868o30 N 68 31 N 961007 N Z258.93 bt 2454,88 N 66 57 ~ 1293097 N 2732°?9 bi 3023°65 N 64 40 g 10000.00 8944.83 885Z.32 32 27 10300.00 9189.93 9097.42 36 15 N 46 56 !/ 3527°62 N 48 17 g 3695.41 o:o 1655.44 N 3115o15 W 3527°70 N 62 I g 1771067 N 3243°08 bi 3695046 N 61 21 g COMPUTATION DATE: 1T-AUG-90 PAGE 5 BP EXPLORATION Z-5 (34-13-11-11) PRUOHOE BAY NORTH SLOPE, ALASKA DATE OF SURVEY: Z3-JUL-1990 KELLY BUSHING ELEVATION: 92.5! FT ENGINEER: G. SARSER INTERPOLATED VALUES FOR EVEN 100 FEET OF SUB-SEA DEPTH TRUE SUB-SEA COURSE MEASURED VERTICAL VERTICAL DEVIATION AZIMUTH DEPTH DEPTH DEPTH DEG 0.00 0o00 -92.51 0 0 92.51 92.51 0.00 0 6 192.51 192.51 100.00 0 5 292.51 292o51 200.00 0 3 392.51 392.51 300'00 0 3 492.51 492.51 400.00 0 3 592-51 592.51 500o00 0 4 692.51 692.51 600.00 0 2 792.51 792.51 700.00 0 4 892.51 892.51 800.00 0 8 0 3 0 11 0 25 0 15 0 26 0 43 0 36 0 29 015 0 30 N 0 0 E S 21 37 E N 34 31E N 85 17 M S 32614 N 0 57 E S 32 59 14 N 52 11E S 74 5114 S 18 34 E 992-51 992.51 900.00 1092.51 1092.51 1000.00 1192.51 1192.51 1100.00 1292.52 1292.51 1200.00 1392.52 1392.51 1300.00 1/+92.52 1492.51 1400.00 1592.53 1592.51 1500.00 1692.53 1692.51 1600.00 1792.54 1792.51 1700.00 1892.54 1892.51 1800.00 0 21 0 16 0 24 0 9 0 24 0 16 0 7 0 16 0 8 0 12 N 32 3 E S 7 44 E S 52 18 E S 78 4 E S 83 52 E 589 1E N 87 29 E S 88 36 E S 86 53 E S 78 32 E 1992.54 1992.51 1900.00 2092.54 2092o51 2000.00 2192.55 2192.51 2100.00 2292055 2292.51 2200.00 2392055 2392.51 2300.00 2492055 2492.51 2400.00 2592.55 2592.51 2500.00 2692055 2692.51 2600.00 2792.55 2792.51 2700.00 2892.55 2892.51 2800.00 VERTICAL DOGLEG RECTAhiGULAR COORDINATES HORIZ. DEPARTURE SECTION SEVERITY NORTH/SOUTH EAST/14EST OIST. AZIMUTH FEET OEG/IO0 FEET FEET FEET OEG MIhi 2992.55 2992.51 2900.00 0 44 3092.67 3092.51 3000.00 4 8 3193.12 3192.51 3100.00 6 30 3294.04 3292.51 3200.00 9 2 3395.68 3392.51 3300.00 11 19 3498.03 3492.51 3400.00 13 27 3601.55 3592.51 3500.00 16 36 3706.89 3692.51 3600000 19 49 3813.92 3792.51 3700.00 21 52 3922.68 3892051 3800.00 24 19 0.00 0.00 0.00 N 0.00 E -0.19 0.00 0.42 S O.OZ 14 -0.30 0.00 0.44 S 0.10 E -0.24 0.00 0.37 S 0.08 E -0.20 0.00 0.43 S 0.01 14 -0.22 0o00 0./+1 S 0.03 E -0.16 0.00 0.40 S 0.04 14 ~ -0.20 0.02 0.45 S 0.02 14 -0.14 0.17 0.41 S 0.06 14 -0.18 0.00 0.58 S 0.10 14 -0.32 0.00 0.68 S 0.00 14 -0.30 0.62 0.70 S 0.03 14 -0-83 0.37 1.18 S 0.31 E -1.38 0.25 1./+0 S 0.82 E -1.93 0.51 1.44 S 1.41 E -2.93 0.00 1.51 S 2.51 E -3.99 0.20 1.49 S 3.72 E -4.84 0.27 .,, 1.49 S 4.70 E -5042 0.0/+ 1.51 S 5.35 E -6.05 0.32 1.66 S 5.97 E S 81 15 E -6.74 0.18 1.80 S 6.69 E S 80 17 E -7.25 0.14 1.86 S 7°24 E S 71 47 E -7.90 0.27 2.06 S 7.86 E S 39 18 E -8.33 0.20 2.20 S 8.28 E S 27 2 E -8o71 0.00 2.62 S 8.48 E S 38 12 E -9.26 0.06 3.17 S 8.82 E S 19 42 E -9.5/+ 0.00 3.42 S 8.99 E S Z 10 E -9.75 0.13 3.83 S 9.01 E S 3 13 E -9.92 0.00 /+.12 S 9.05 E S 19 51 14 -10.00 0.95 4.31 S 9.03 E S 84 50 14 -9.90 3.45 N 58 23 14 -5.36 3.56 N 59 23 14 3.99 2.36 N 57 32 14 17.51 2.88 N 59 32 14 35.62 1.86 N 60 25 W 57.38 2.75 N 63 17 14 84.08 3.86 N 68 I W 117.05 2.89 N 67 6 14 154.94 2.44 N 63 18 14 197.60 2.05 0.00 N 0 0 E 0.42 S 2 26 W 0.46 S 12 22 E 0.38 S 11 58 E 0.43 S 0 /+7 14 ') 0.41 S 4 6 E / 0.40 S 5 34 14 0./+5 S 2 53 W 0.41 S 8 47 14 0.59 S 10 13 W 0.68 S 0 19 14 0.70 S 2 47 14 1.22 S 14, 43 E 1.62 S 30 11 E 2.02 S 4/+ 20 E 2.93 S 59 2 E 4.01 S 613 11 E 4.93 S 72 21 E 5.56 $ 74 15 E 6.20 S 7/+ 26 E 6.92 S 74 58 E 7.47 S 75 37 E 8.13 S 75 21 E 8.56 S 75 6 E 8.88 S 72 48 E 9.37 S 70 14 E 9.62 S 69 12 E 9.79 S 66 57 E 9.95 S 65 31 E 10.01 S 64 29 E 4.74 S 8.69 E 9.90 S 61 23 E 2.72 S 4.62 E 5.37 S 59 31 E 2.16 N 3.37 14 4.00 N 57 17 W 9.06 M 15.01 W 17.53 N 58 53 W 18.76 N 30.35 14 35.68 N 58 17 W 29.59 N 49.23 W 57.44 N 58 59 W 42.17 N 72.78 14 84.12 N 59 55 W 55.69 N 102.95 W 117.05 N 61 35 W 70.01 hi 138.2B W 154.99 N 63 9 W 88.07 N 177.02 W 197.72 N 63 33 W COMPUTATION DATE: 1T-AUG-90 PAGE 6 BP EXPLORATION Z-5 (34.-13-11-11) PRUDHOE BAY NORTH SLOPEr ALASKA TRUE SUB-SEA COURSE MEASURED VERTICAL VERTICAL DEVIATION AZIMUTH DEPTH DEPTH DEPTH DEG NIN. DEG MIN DATE OF SURVEY: 23-JUL-1990 KELLY BUSHING ELEVATION: 92.51 FT ENGINEER: G. SARBER INTERPOLATED VALUES FOR EVEN 100 FEET OF SUB-SEA DEPTH VERTICAL DOGLEG RECTANGULAR COORDINATES HORIZ. OEPARTURE SECTION SEVERITY NORTH/SOUTH EAST/NEST DIST. AZIMUTH FEET DEG/IO0 FEET FEET FEET DEG MIN N 63 44 W 245.19 2.21 N 65 3 M 297.99 3.66 N 68 36 M 356.48 N 69 15 ~ 416.67 0.32 N 69 24 g 477.94. 1.15 N 69 44. ~ 54.1.41 0.34. N 69 56 ~ 606.23 0.63 N 70 38 M 671.75 0.13 N 70 4.9 ~ 737.02 1.00 N 70 41 M 801.32 0.35 4.033.4.5 3992.51 3900.00 26 4.0 4.146.58 4092.51 4000.00 29 23 426,2.56 4192.51 4100.00 31 0 4379.54. 4292.51 4.200.00 31 31 4.497.11 4392051 4.300000 32 4 4615.88 ~4.92.51 4400.00 33 3 4735.4.1 4.592.51 4500000 33 21 4.855038 4.692.51 4600°00 33 4.1 4975.25 4.792.51 4700.00 33 11 5094.59 4.892.51 4800.00 33 6 N 70 25 g 865.66 0.26 N TO I M 929.66 0.28 N 69 47 ii 992.99 0.67 5213.93 4992.51 4900.00 33 5 5333°05 5092.51 5000.00 32 46 5451077 5192.51 5100.00 32 32 109.52 N 219.51 W 245.32 N 63 29 M 132.10 N 267.33 g 298.19 N 63 42 W 155.25 N 321.30 ii 356.84 N 64 13 W 176.92 N 378.00 W 4.17.35 N 64 55 ~1 198.74 N 435-85 W 4.79.02 N 65 29 W ~ 221.13 N 495.90 W 542.97 N 65 58 ii / 243.81 N 557.31 W 608.31 N 66 22 ii 266.15 N 619.71 ~I 674..45 N 66 45 ii 287.97 N 682.11 ~ 740.41 N 67 7 ~ 309.47 N 743.58 ii 805.41 N 67 24. ii 331.10 N 805,01 M 870.44 N 67 39 W 353.02 N 865.92 M 935.11 N 67 4.9 W 375.05 N 926.00 ~ 999.07 N 67 57 ~ 5569.84 5292.51 5200.00 32 1 5688.13 5392051 5300.00 32 34 5807.24. 54.92.51 5400.00 33 !2 5927.15 5592051 5500.00 33 51 604.8004. 5692.51 5600.00 34 27 6169.56 5792.51 5700.00 34 48 6291072 5892.51 5800.00 35 12 6413.85 5992.51 5900.00 34 53 6535.40 6092.51 6000.00 34 26 6657.06 6192.51 6100.00 35 9 6779.26 6292.51 6200.00 34 59 6901.37 6392.51 6300.00 35 11 7023.59 6492.51 64.00.00 34 4.1 7144.94 6592.51 6500.00 34 38 7266.90 6692.51 6600.00 35 10 7389.49 6792.51 6700.00 35 41 , 7513.37 6892.51 6800.00 36 31 7638.12 6992.51 6900.00 36 55 7763.54. 7092.51 7000.00 37 32 7889.90 7192.51 7100.00 37 32 8015.4.0 7292.51 7200.00 36 57 814.0o10 7392.51 7300.00 36 29 8264.038 7492.51 7400000 36 24 8388.23 7592.51 7500°00 35 4.6 8510.93 7692.51 7600.00 35 0 8632o51 7792.51 7700.00 34 35 8754.020 7892.51 7800.00 34 48 N 69 35 M 1055.15 N 69 54. ii 1117.71 N 70 12 ii 1181.71 N TO 18 ii 1247.14. N 70 30 ii 1314.27 N 70 35 ii 1382.4.8 N 69 57 W 1451.85 N 69 34. ii 1521.27 N 68 50 ~ 1589.74 N 67 56 g 1658.55 N 67 12 ii 1728.42 N 66 26 ii 1798.20 N 65 42 W 1868.26 N 64 53 ~ 1936.86 N 64 45 ~ 2006.58 N 63 34. ii 2077.40 N 62 28 ~ 2150.51 N 61 1~ W 2225009 N 59 22 ~ 2300.76 N 57 48 ~ 2377.88 N 57 41 W 24.53.53 N 57 30 M 2527.84 N 56 41 ii 2601.41 N 55 52 ii 2676.17 N 55 12 ~ 2744.85 N 54 22 M 2813.51 N 53 45 ~ 2882.27 0.45 0.65 0 0.61 0.4.8 0.23 0.50 0.4,2 0.51 0.71 0.39 0.69 0.82 1.19 0.34 1.19 0.4.7 0.82 1.30 0.90 0.21 0.4.2 0.43 0.49 0.27 0.93 0.85 396.87 N 984.86 ~i 1061.82 N 68 3 ii 418.80 N 1044..11 ii 1124.97 N 68 9 ii 4,40.85 N 110~.94 kl 1189.64 N 68 15 ~1 463.25 N 1167.20 kl 1255.77 N 68 21 ii .;4.86.06 N 1231.18 W 1323.66 N 68 27 W 509.03 N 1296.29 ii 1392.65 N 68 34 ti 532.69 N 1362.35 g 1462.80 N 68 39 W 557.02 N 1428.11 ~ 1532.90 N 68 581.45 N 14.92.74 W 1601.98 N 68 43 607.01 N 1557.1~ kl 1671.27 N 68 42 633.82 N 1622.07 ~1 1741.50 N 68 39 661.39 N 1686 49 I~ lb811 54 N 68 35 689.93 N 1750:69 ~I 1o81:73 N 68 29 718.58 N 1813.18 ~1 1950.38 N 68 23 748.35 N 1876.35 kl 2020.07 N 68 15 779.20 N 1940.18 g 2090.80 N 68 T kl 812.47 N 2005.29 ~ 2163.63 N 67 57 W 847.56 N 2071.11 g 2237.82 N 67 45 884.99 N 2136.89 k~ 2312.90 N 67 30 W 925.46 N 2202.68 ii 2389.20 N 67 13 966.03 N 2266.75 M 2464.02 N 66 55 1005.87 N 2329.69 g 2537.56 N 66 39 1045.90 N 2391.68 ~1 2610.37 N 66 23 1086.4.5 N 24.52.4.8 ii 2682.35 N 66 6 1126.72 Pi 2511.06 ii 2752.26 N 65 50 1166.58 N 2567.56 kl 2820.15 N 65 34 1207.21 N 2623.77 ~1 2888.17 N 65 18 COHPUTATION DATE: 17-AUG-90 PAGE 7 BP EXPLORATION l-5 (34-13-11-11) PRUDHOE BAY NORTH SLOPE~ ALASKA DATE OF SURVEY: Z3-JUL-1990 KELLY BUSHING ELEVATION:' 92.51 FT ENGINEER: G. SARBER INTERPOLATED VALUES FOR EVEN 100 FEET OF SUB-SEA DEPTH TRUE SUB-SEA COURSE NEASURED VERTICAL VERTICAL DEVIATION AZIHUTH DEPTH DEPTH DEPTH DEG MIN DEG #IN VERTICAL DOGLEG RECTANGULAR COORDINATES HORZZ. DEPARTURE SECTION SEVERITY NORTH/SOUTH EAST/gEST DIST. AZIMUTH FEET DEG/IO0 FEET FEET FEET DEG 8875.81 7992.51 7900.00 34 38 8997.04 8092.51 8000.00 33 55 9116.54 8192.51 8100000 32 32 9234.70 8292.51 8200.00 32 19 9353.43 8392.51 8300.00 33 0 9472.80 8492.51 8400.00 32 53 9591.16 8592.51 8500'00 31 40 9707.60 8692.51 8600.00 30 0 9822096 8792.51 8700.00 29 44 9938.50 8892.51 8800.00 30 58 N 51 21 I,i 2950.63 N 49 37 W 3017.81 N 49 Z g 3081.71 N 48 57 ~1 3143.13 N 47 52 M 3205.46 N 47 Z Id 3268.65 N 44 46 ~ 3329.62 N ~.2 50 t/ 3386.30 N 43 52 ~ 3440.85 N 46 23 ~1 3496.39 1.55 1.16 1.61 0.74 1.63 0.89 1.59 0.75 1.52 2.44 1249.08 N 2678.85 ~1 2955.74 N 65 0 Id 1292.90 N 2731.54 ~1 3022.06 N 64 40 1335.57 N 2781.12 kl 3085.19 N 64 21 Id 1376.88 N 2828.61 kl 3145.92 N 64 3 1419.29 N 2876.54 I,! 3207.63 N 63 44 Id ) 1463.43 N 2924.52 g 3270.24 N 63 25.g 1507.39 N 2970'08 g 3330.71 N 63 5 1550.61 N 3011.16 kl 3386.96 N 62 45 Id 1592.58 N 3050.49 kl 3441.19 N 6Z 26 Id 1633.27 N 3091.63 ~1 3496.54 N 62 9 10056.89 8992.51 8900.00 33 40 10179.21 9092.51 9000°00 36 15 10300.00. 9189.93 9097.42 36 15 N 47 6 ~ 3557.64 N 48 17 N 3625.93 N 48 17 M 3695.41 2,,26 0.00 0.00 1676.59 N 3137.85 M 3557.68 N 61 53 g 1724.14 N 3189.78 M 3625.93 N 61 36 ~ 1771.67 N 3243.08 I,I 3695.46 N 61 21 ~1 SCHLUMBERGER O I REC T I ONAL SURVE Y COMPANY BP EXPLORATI ON · t WELL Z-S 134-i3-i i-! 1 } FIELD PRUDHOE BAY COUNTRY USA RUN ONE DATE LOOOEO 23 - JUL - 90 REFERENCE 74003 WELL: (975' SNL, ('34-13-11-1 3930' WEL, SmC 19, TllN, R12E) HORIZONTAL PROJECTION NOR?H SO00 4000 ~000 2000 1000 REF 7400:~ SCALE = l/lOOO IN/FT -4-4..4,...;-.4-LL4-~ .... ~...,t....~...~...~....L.4...~....; ...... i.4....L...L.F.,L4....k.4 ...... .L.L.L.L.~.4.-.,k.~..-~ ....... ~-.i-..~-..~...{...L..~ .... ; ...... ;.. ~ ...... l .... ~...; :, .................... ~ ....... ~ .............. ~.. i .... --F4...~-4.--kF.~.-~.--; ..... F.F+-+.+--F-F.F~ ...... ~...F.~...;...~4...F-~-4 ...... ~..F-F4-..~.4...F-~.~ ..... ;..:~.4...+ r;"F; ...... :,, ~ :..,; ~ ....... i.+;... : ..., .... -4...~...~...~.-~...~...L.~-..; ...... ¢..4. ¥..;..4...~...~...~...~ ..... ~. L..~...i...~...;...~.-.;.-.~ ...... ~...~...~...;...~..-¢..4...;...~ ....... ~...;-.;.-; t...¢, i...i ...... : i .......... ~.; ..... i ~ .......... ; ~ .. ~ ..... -~ ~ ~..4...L..~...L..~.-~ ...... ~...~..4..4...L.~...~..;..; ...... i..;...;..;. ~ 4.i..;. i ...... ~..i...~ .... i ..... ~ ...... ~ ...... ~...;..~ .,.~.. ~:..: . . :.; ~ : ....................... ~ . . - ~ i i !~ i ~ [ ~ : i : : ~ : ~ ~ ~ ~ :~ ~ : ~ i :: : : ~ ~. ~ : , : { i ~ : ' : ' I : . ~ I ' : -~--t ....... t.--~ ---~.'.?~-t ...... r--+.?-r-'~ ....... ?r-? ...... ?"r"?"?' ,'"?t'-'?"t .......... r'-t ....... f---r"?--r"t ....... ?.-t-"t'.'t---t-..~ ........... *-..~..-~ ......... , ................. , ........ : ................... ~...L.L.L.~...L4...L-i ....... L.LL4-.+..L.L.L..~ ...... L.L-L.;...L.L..~ 4..-~ ...... L.i...L..:....~ ....... ~..-~..-~ ....... ; ....... ~...~-.~...L.;...~...:. ....... ~...~ .i .... ~ ............ ~..L.~...L~ · , ~ ...... : , . : : . : : : ; . : : ~ : : , ... : . · ..... ~ ' ~ ' .... ~-,f-+--+,-.~ ...... +.-.+.--~ ....... +--.+-+...+.--~.+-.-+..-~ ............... +-"??-~"r'-r'?-"t ...... r--f.-.r.-?b..?-.r..t.--t ....... r-.t ....... r--~---+..+'-~--'+ ...... ; ....... r"~-"t"'r"r"~ ..................... 4 ...... _~ ¢ ~ : ~ , i : : i.~ .: , : ~-¢-.-; ...... :...~..~...¢...L.¢...~...L..¢- , '.: ; ~ : ~...i.;... ; ;...,-~ ~ ~ ~...~...L..¢ ~..¢ .;...~ ~ .~ ....... ~ ....... ;..¢...~...;...~ ....... ,...¢...~ .......... ,.4...~.4-; .......... ~... ~--~..-L~-.-~.4.-* ....... ,...,...~-,..4-..,-..,..4-..~ ....... *-.-*-.~---~4--~.--;~--.* ...... *--.~.-.~-..~.-.~-..~-.+--~-.-~ ...... *--~-..;..-*...+ ...... ;..-*...~ ..... * ............ *-~...*'-'* ................... ;"J"'~'";"'~ ......... ~"+"*"-J .4-.+-~.4...~-.i...~...~...z ....... Lt...;.4...F.;...¢...¢...¢ ...... ~..-¢...z4..-p¢.4...F.¢ ...... F4.-.¢..+-.f-4--.;--.;.4 ....... ¢.4...¢...L,...;...,...Z..-F.:...,...Z ....... ~...i...;...;...F.; ...... ,...: ..... i4...;...; ~..;.Z.$J..J~ :...~ ....... L.~...:...L~...L.L.~...~ ...... L.~...:...;...~...:...~ ....... ~ ....... ~...~...L.:.+.L.i...~...: ....... L.Li..~...L.LLL:. ...... :...L.LL.L~..~...+4 ...... ;..,~ ....... ~..-~...:...:...~...: ~..F.~J_.,...+2..~ ..... L.LL.Z ...... M..L.Z ...... L.~...L-;...k.LL~...Z ....... ;_M...L.,...L.LL.Z ....... z...i...z...z...L~...~...~..~ ...... ;...:..;...=..:...i...z...:...; ...... ;...i..4..;..4...z...~...:...: ....... ;...z...z...;...t..., ....... z..z 4~-4.-'...i.-.~...~...~ ...... t..-!...M..-F.k~-4--.~ ...... F.!...M---F-~-.-F.F.~ ....... F.~4.-+.-F+--~.4---+ ........... ;.4...i.4...~...F.F.~ ....... ~-.-~'"~--+"F'~...;-'-~"'; ...... ~ ..... ~...:-.+.,.~ ~-L.~--4 ....... ~-..~-,4.--~ ....... ~---~--.~--.~...i-.-+.--+--.¥-~ ...... ~--t--~..'+-i---~--4--+--~ ...... ;---~,.,~-..~-.-f-..~.,.+...~-.4...:-. ~.--~.--+-..+...~...~...+..?+ ...... r-.~...~ ....... t"+"~"'~" ~ ~"'~' ';"'/"'t :tt:zlzt:: ::::::::::::::::::::::::::::::::::: ::::::::::::::::::::::::::::::::::::::: :::::::::::::::::::::::::::::::::::::: ::::::::::::::::::::::::::::::::::::: :::::::::::::::::::::::::::::::::::: :::::::::::::::::::::::::::::::::: ~'4-4---M---'-4'~k--44--+4 ..... ~.4-4.4 ...... F.i.4..+.-~-F.k~..4 ....... ~-.-kF-F.f4.4.-.F-~ ....... M.4...~ ..... ~.4.4...F.r~..LI.4...:-4...M...; ....... F+-4...~..+..~..,~...~.4-~...~-,.k.¢ k+4---f--~-,.-~..~--+--+-,.-4--~.+--~ ...... +.-4.-+-.~--.---~.--L4---+--t-.4--4.,-~--.~ ....... ~--4-..+.-.+..-f-.+-..+...+--~ ...... ~.-.+..4--+ ...... ~...~...+...~... ~...+...~...~...~......4..4.-.~.-.+ ...... +.-.+ ....... ¢-.t.,.*..,+...+...~.-~ ~ : - : · : / ' ' : : : : : : : ' : ' : ' : : ' ~-~.4--.~-.+++-+ ...... ~'-+-+-+--~'--f---+-~-'-+ ....... +--+.-~.-t--~.-+-+4.--~ ....... +---r'-t-..f.+-.r]..t-+-.~--.F-f".t---+ ....... ~'"+"-f--'t ....... ,"t"t'"?'v-~-['+'t" "?"?'r"f-~"'t"+'+"t~ J J:, H-i'-+"{ ...... ~-+-~'-'[ ...... ~'"f"+'+"1'"f'"F'J'"f ....... t'"t"-t'"f"'t'"F'f'"f-"~ ....... t'"?'t"+"?t"-f"t"t'"~'"t'"t'"f'"t ...... f-.+--t.-.[..k..i.t..-t...t..-~...t.-.,...r.t-.. "t'+'?'i ...... t'-'?'t ..... r'Ft"-t ...... t"'r'~"T'- ~l~ ......: ~z~:$4 ...... l...t...t...t.?t...;..L~...t~ ...... ~...i...i...t...I...;...t...;...~ ....... ~.~..t...L.t'_;...;...t..4 ...... L;...;...; ...... } ~...~...;...z..., :...z...~...L.t~ ...... ~ i...;...L.z ...... L.;..4.4 ........ ...... ~...?...+...~ ..... ~-,+...~:: ........... .... :..4...:..~ .... -e.+--t---, ....... +.+.+.+.-.-~.-+.?.+-, ....... ?...;..~.-.:...,...?T.?..~...:..: ....... ~.-.:.-.??-T-.~--?.=-.t ...... ~.-.~..-z.-.~.-.t...¢.--~-.-¢--.t ....... ~.--~..-~...t ....... ~...~...~..-, ....... ??r..,..-..-?.-?-.?~ ...... ~..-: .............. ?--.?.~ .... h~+-~--+4.--F-+--.F+-+-+'+--+...~--~i ~'-'¥-,---?-+'"~---+ ....... f'"+'-+'t-'t"+'t'+--+ ...... r'-+-'-r-'f'-F-r-f'-+'+--+-'+"?-?-}-f--t"+"+'""t"r't"f ...... f--r't-~ ..... +?t"t ....... t"T"+"'t ~.~---~--.-%4-4-e-..++++-+-+--~-..-t~.-f-t-t-t-'f ....... ??t'"t--t"t"t't'J ..... t-t"t-ftt'-f"W+ ....... t-'-t'"t-t-"t"t?'t'"f-'m'f'~-~ ....... t'"t-'r"t ..... +"z"t"t ....... t"'vt"t- ,--~-~..~-.-~ ....... F4.4-4 ....... ~.-+-.~.--~.--*.-4-.-~--.+..~ ~'--+--'+"+t+'+'+"+ ....... +"+'+"+'+"+"'+"~'"+ ...... +'+"?'+"+'-'?+'"+ ....... +'"+"+"?'+"+'"*"+"+ ...... +'":"+'~ ....... ?r"f"? ~b-'~... t , ~tt~'-'- -`-~ ..... ¢'-,~TT:'-:'-:"-{-'-:--'¢'"'""t ~ ~ T ..~L..J~.~.~..-;..-;~,: ~ ~ ...... ;...;...¢...¢..+..~...~...z...¢...: ~ ~ : ~ ~ ~ : ~ ; ' ~ ~ ~ ~ ~'4'"¢"'¢"4"$"~'"~":'"¢ : ~ ....... ;...~...¢...¢~ ~ ~ ~ ~ ~ ' :~"';"';'"; ....... ;...;..4...,~ ~ ~.'~ ' ~..' ~ ...... -+-+-+-+**J-'+'*'+'-'~'*+-"-+--'??r'-t'-t"'t'"r"t ....... t-'t~'~'T"r": '-'r--r"r"r":-"r--r"r"t ..... r"t'"r"r",'"r"r"r"t ....... ?t'"r"r"F"t ................... ?'-t"'t '-r',"-~'"t · ?"~ ...... ~-4-.-......4.......~-,..- -4..-~.~-+.T-.~-~-.,...,.....~+---~,.~..-*...t..-t..~ ~.*---*-..?~.-.~-..*---~-.-~..-~... F..*---~--,-~t .......... ~..*...* ...... +.-*-.-+...?t..~..?.??..' .-~...??~..T..?.-?t-.t ..... ' i ! ! ] .... ' ..... ' :' : ' ...... ' ' ' , ....... ' I ; ~ ' ..... ., ...... , I ~.: ' -~ 4-.~-..~ ..... ~.-4...$---~ ....... ~--.;--.~.--~--.~.-.~-.-;.--~.--~ ....... ~...~...¢..-~...'.--;...$...+ 4...~...~-..i...~...L.4-..~...~...4 ....... ~...i...~...~ ..... ~...~..-~.-.4 ....... ~..-~..-~...i.-t..~...~..-~-..4......~-..~..-~...~ ...... ~...~...~-4 ~..~4 ..... ~.~_.~..~_...~...~_~...~...~..~...~...~ ....... ~...~...~...~...!_:..~.F~...~...~...~ ....... ;.--~..~--.~ ......~ k~-.-~-.-~.~-.F~-..;---~-.i...~...~.-.+-.¥.~-.?~..-~..-i .....'t ~-4-+.~ ...... F+'-+"; .....t i'+'+'+' --4--~-~.4 ...... ~---~-4-~-.-4...~---~.-.~-4-~.-.~.4.--~ ....... ~---~--.~---+---~--.~--.~-..;---~ ........ ~-.+.~..~.+-.~..~..+.+..+...~...+-+...+..+~v+..+..~...:.......;..+..+..+.....+..+...+...`..~..+..+ ...... , ...... + ...... ~."+..-,...+ ...... t"? ~-~.4 ~- ; ~ ~...; ....... ;..4-.-L..~...~...~...;...;.-.;~: ....... ;...;--;..-L..L..;...;...~.-.;...' .~.4...~ ~ ~ ~ ~ ~ ~ ~ ~ : ~ ~ ~ ~ ~ ~ ~ ~ ' ~ ~ ~ ~; ....... ;...;...~...;...L..;...L..~.;1 .~...z._~...;...~...;...~...;...;..., ...z...;...;..4..~..+..;......4 ~ ~ ~ ~ ~ ~ : ~ ~ ~ . ~ ~ , ~ ~ ...... ;...;...;-.;... ~...;-~.-~...~. ~ ~ · ~ ' ~ ~ ~ -~'~--?" ~?"-~'~ ...... ?-*'"?"~ ..... ?'~"*'-~ ...... ¢'"~'"t'"t ...... ~"'t'"?"~ ...... t'"~-'t'"t ...... t'"t'"t'"t ..... ~"~ ...... ~" "?-~ .... '"'?"?"T"'?'r"?"' ...... t-'? t ? ~ 4.~- ,~ ~_~_...~...~...~...~...[_~...~...~..~...~...;-;...~...~...I...~-~...~...~.....~...~...~...;...I...;...~...~...~... ~71~_.~ ....... ~...~...~...~ ........... ~...~ .......... ;...~...,...+ .......... +...,..., ......... + ...... + ........... +...+..4.-. : ti: t : ~ : : : · ~ : : : : ~ : : : : : ; : t : ; : : : : : ,, : , ~ ; t : : ; : : : ~ : , : ~ . : : : ~'t"tt- r'ff'+~"~ ....... t'"t'-+"t ..... t'-t-'t'"~ ...... t-"~-'t'--t ....... t-'t'"r-: ...... t-.~..,'-t ...... t'"t-"t'"t- ~-~ . "+"?" ' "'t-t'v-t"'t"t": ...... T"T"T'~ ..... r'T'T'~ ....... T'~'-["T ....... T"T"FT" ~44..-~-.-~-..~-.-~.-.~ ....... ~-..$-.-~-.~ ....... F.kF-~-..J-.-~.4...~..-~ ....... ~...~...~...~ ....... i.4...~...kkk~.4.4 ...... ~...~...~.-.~ ...... k~...;.4 ....... k~.4...~...[..k~...F-~.-....4-..+.+-.+ ...... -~.~.~+..,...~..4.4-~..-.~-J---~--~ ..... +.4-4..-;.-i.--4-4-4--4 ....... ~.-4.-4..-~ ....... ~-.-~-4.4.-+-4..4..-~-~ ...... ~.-+.4-+.--,.4...;-.4-..~ ....... ~--.~-..h.~..+-4...~.-+..~... ,.-t.-~..-~...+ ....... ?.+,+..~ ...... ---~J.-4 ....... L.$.4...~ ...... L-~---~---+-4-.4..4.4-~ ...... +---+--.~-.-~ ....... ~--+-.-~..4 ...... +...~-..+---+-.-L+..+-4.--+ ...... +-+.4-+..-~.-~.-.~-.-~..4 ....... +...~...i-.-~.4-?~..4...~ ...... +..+.-~..-~ ....... ;..+. ~.- -+-+..4-.~ ...... M-4---+ ...... 4.++.-~.4-..~.-.+..-~.-.+..~---;--+-+--+ ...... +---~..-;---+ ...... ~.--~-+-+ ...... +-.+..+-.-~ ...... ~-.-~..-+-.-+ ...... +-.-+...+--.~ ....... ~.-+--~..:...f.-.;-..~..+..+ ....... f.-.~.+..~...t...+...;.., ............ ?~..+..}..-+..-r.+-+-- -LM4...,4.4-$.-~ ....... ~-.~.44.4-4...~-F.~...~...~.-.~.4-~...F.~-~...L.; ....... F.~...~...L:...i...~...;..4 ....... FF~.4-..~...F~...~4...~.4...~,-~...i.4...~...~...kF--+.+..F4 ...... ~-4.+. ~'"t'-~-'~ ....... +.--~-.-~--.~-L~.--t--+-+.-~.4...~-.-~..-~-.-~.--f.-.~.-.t--.~ ....... ~..+-+-ff ...... ~---~...~--4 ...... ~-..~-..~---~ ....... ~--+-4.-.~..-:..+-+..t-..~.-.f..~...+...f---t ....... t"'t"'~'"t ....... t'"?"'t ...... t'"t"t'T"t"?":"'t-,"' ~.~4- ~+-~-~-~ ~-~-+-~ .... +.-+..~"+'"~ '"~"+-f'"+'~'"+'-'+'--+'"+ ..... ~-'+-'~'+"~ '-'+'-+"~ ...... i'~"~''~''' ~'+"~'"~'"+-'~ "~'"~'"?~-'~"+'+"+'"~ .... r"?r"t ....... t'"T"t'"T" -'~'"~'t'"T'T-?r-t-~"' ~++.-,-.f-f..ff--ff----f..-f+-t ...... f.-.f-+-i ...... Ff-.f-'+..+-.-f-f-.-f.+...-~.--f--~-'-f ...... f"f"i-~"'"+-*f-'~ ...... t'"+-t'f ..... t+i'"f"'t"f"'f"+"f"' "ri'"t"'t'"'-'f'"T-~"~ ...... -~-~---+-, ~-~-..+---f ...... f..~-'+ ...... +"-+"-f'"+"~ '-~'"~'"~'-f ..... ~"'~'"t '"~ ....... ~-.~-+..~..., ..~...f..~...~ ~-.~...+...f... h..~...~.,.~---+ ....... t.-~..+...+.-.~.., f .--f ..ff...~ ....... ~...*...~-.-~ ....... ~'"+"'r"+ ....... t"-~'"+"? ~4.4...~.4-~.~-'-~..4--4-"~-'-~'+--~--4-"~-4'--~'"~--4 ....... ~.--~-.-~-.~-.--~+4--.~-..4--~+~- ...~...~...~...+ ...... +-+.4---~ ....... ~..+-+..+.+.4-.4 ....... + ....... ~...~..+.-+ ...... +...~-~"-~ ..... +'.~-+"+ ...... ~-+-+"+" -~k~..`-.~.-~.--.~+-..4...+-h.+...i4.4.4..4...`-.t..+4..~.."4-~+4..:4-4~...4.4.4...+ ...... ~.--~-.¥4-..~--4..-~..+..+--.+..-~-4..+.-+ ....... +...;.-+..~ ....... ;..+.+.-+ ...... +-;..+4 ........ 4..+..+ ~..~......~-.~-.+-.~..4 .... ~.++..~....+4...+-.~.-..4~+-~-.-+.4-+..~ -~++-..+-~...k.....~-+...~..~ ...... k+-.~.-.+-F.~..4..+.-~ ..... -+"~"'~ ...... ~"-f"'t"'f""-?F+"t"'-'+"?'f .... .II I ; f ' I : · ~ ~ ~ ' ~.4.- -~..-$..4.--N....~..-.l-.-4.-*...f-+ ...... +..+.?.+-...~-4-~+ ...+++ ~ {+-.H .... +.*.-+-+-.-~-f-'-f-"f'"~"~ "'f'"?r"t"'~'"?"+'"t .......... t'"r"?'"t"'l '"T"'?t'''t ...... T'"t"T'"? ...... T'"?"'t'''+''" .' '...'...~ ...... ~..~ .~$-..-.$.-$-.$...$ ...... L..$-..~..-¢ ...... ~..-'-.~-4 ....... '...$...$-~,...~.'~--+..~.4-.$ ...... ~-..~.-4...~ ...... ~...~-~..~...,...~...¢...;-.;..'.4...;--;..-; ...... ~'"+ "*"'*'"~'"r"+"*"'+ ...... f'T'+"* ...... ~...~--.~-~.~--~...~.-~-$....~.!4.4 ..... ~kk-~- -~..-.-~.4..+J...~-..~...~.-.~ ...... ~..4...~...;...}..-~..+..k~ ...... ~...~..4...~ ...... +..;..4...~ .... ,...+-+-+ ...... ~..+.+.~-. . : : ~ . ~ i ' : : i ~ : . : t ~ , . . . · · . I i ~ ~ : : . . · : ~ ' ~ ~ : ' : , ' . ; : ~ ; : ' ' : . ' ; , . · -~.-~...,~..4-~ ......... ~..~-..~ ........ ~...;.~ .~-~-.~-+ 4~ ~-.$-~.. ~ · ~ ~ ; ~ +~ ...... *-4.-.~.-.+..4-.-~-.-+.--?.-~ ...... +..-~..-¢.--~-.+.-.~..-~-.~ ......... +.. ?"* ...... ~ ....... t"'~-'~ .......... ~"'T"'r",'"¢ ....... T"'~ ~-~-~..~..4..~....i-~-kk.-~...k~ ..... ~-~.--~..-~ .... ~4.-t-~. ~ ~ ~ ~.~..-.~+~-~...~...~..k~...~ ...... k:..-k~...~..-~...+...;...+ ..... ;-..:...+..+..+...~...~'.+.., .......... ?+.-.~ ...... ~-'.+'-'~"- ~..4...~.-r.--4.4-4..-~ .... ~..4-~-~-.-.-4-+.4-~ ..... ~---~--+--f ....... ~.4---~-..4-4-f.-.~-F'~"+-~ ..... ~'+--~-~'"?'"~'"~'"~ ...... +...f-.-t-f...f-t ....... , ........... ~ ......... f't"+"-t"?': ....... ?:'"?t"'t'"t"'t"r"t"' -~4--4"4 ....... ~"-~-~"-~ ....... ~'"~-~'"~ ...... ~...~..-~..+--~-.+..~-~...+ ....... +-+-.~'-+ ....... ~.--~--.+--~-. ~4.-+"~ ....... +-+-.~--~-"}"+.'?+--'~'" ~'-'?~'-+-'+"+ ..... ~"?' ~ .... ~ .............. ~ ......... r '~"" "T"t'"r"t' .t...t...T.'r"~ ~.-~1: ~:~t' ~ ' ~- :.~4-~r T -'~ :-~ ~ ........ ~ ~$~ ~4-$ ~-~'~ ~_ ~ ~.~ ~. .......... $ ~ ~.~_ .. ~..;...¢...¢} . ...... ¢...~..4..4...'...~...,...~...;. .~ .... ...... ~ ....... ~...$ .... ~ $...~: ....... + ...... ~...;...,..4,, ...... }, :~..+.+..~ .... ~_~...,-~..~.~- ...~.+.~..~--~...~-L~...~...~-~.,...~-.~.+.., .... +.+.+-~-+-?---?.---?--??~..-~-..?~--4.. i ..... ~.4..+-.~-.-~-+...~.,.+-.-~ ....... r..i ....... ; ....... ~..+..~'-~ ....... h~'-t"t"T't.-~--'~"-~ .... ~- ~4-4-~. ~--~-.-~-~-~4.q.-4 ...... ~-.~-~-.~ ..... ~.~+~.~.+.+..,-..~-~...?~-4.-.~..~-~.-.~ ....... ~-.~-.+...*'.'~..'~ ....... +'"~ ..... ~ ....... ~'", ...... ~ ....... ?'+ ..... "-~'"f"*"'~ ....... +'+"* .... -~-4~..-~+.~ ~ F-~-~-~4-.-~-~+-+-,?~--+4 ...... ~.4-~-~4"74-.+-~"~-4'"~4'"~"+4-++-~'"r4-4 ....... ~'"~'"~"'~'4"'t ....... ~'"t'"t"'t ....... ~"'~"'~"+" ~'"~"t"~'"F'F+"~'"~ .... ~ ..... ~..4-4~..~-~.~- ~-.~-.~-.~... ~.~..4 ..... ~.4...~.-4 ...... ~.-4-4.4...~-~..4...~-+.-~..4.4..-~.-+t+..~-.,~ ....... ~'"~"'r'+"~'"t'~'"'~'~"'~ ..... : ....... r"~ ......... ~'"f'"t .... f.-.+,..f...~...[-r..*,..?f-~ -4000 -~000 -ZOO0 - 1000 0 1000 ZOO0 3000 WELL: ~-5 (~34- 13-11-1+~ (975' SNL, 3930' WEL, b___ 19, TllN, R12E) VERTICAL PROJECTION -2000 - 1000 0 0 1000 ZO00 118. I / - / ]~:' i i i ~ : ~ ~ ............. ~_.~..~._~_~...~..~L~_.~...~..4_i_~_L~._L.~_L.~...~_~' ..... . . ~uuu 4uuu ~000 ~000 r'~ ~ ¥'~'TT'i"~'"+"¢"~-'~++-~-~'~ .... ~.~.~--L4...~..~.~ ' ~: ~, :~ :, ~ , .... · ~...`...?.~."r..r..?r....r..~..+..+-+.+.+.¥..~.~~..~...L~...~...~.~.~...L~..~i...~.~.~ ....... ~...;...~..~._~...~._;...~...~.. ~ ~ ~1~ ~. ~. *-,'"~'-'~-+'-,'-~ ....... + ......... ~ ......................... ) .......... t'~'"~"'~'"~"'~"'~"+'-~ ....... +..~.-~..-~-.-~.--~---~...¥.~.-.k.~..~kL.5-.L..&.~ ..... ~..-;...:-..~...,...~-~...~..~.] [ [ ??"I"':"'¥'~"~ '"~'":"~"+"f' ' '~' ' ~ '+ ~ + + .... , · ,'-: ~ ; -'-+-.-+-.+-.~ ...... *-.-~...i.-* ....... ~...~.-~...~ ...... ~...~...L..i ...... ;...~ ~ ~ ~ ~ ~ ~ ~ T T ~ i ~ ~ :-t"'t"'T"t'"T'"~"'+'"t'",'"-*'"+'"!"~-+ ,'-'~-.-, + ........... ~. ~ ......... ~ , ~. .~ ]~]]j] :::i::tiZ]::]:??'"?"~'"??-'f'---D~?-.~4..-~--f..H.--~, +. , ,'"+4'+'~'")-+"~'"~'"+'" ..4...~4...L--...L..~...~...~ ...... ~...~...t:...[..t~...i...~, ....... ~...~..~ .;.4..., L.L.'..4 .... ] ~: ~ ~ ~ ~: ~ ~.. ...... ....... + ....... -¥T"?'T .......T'"T"T"~ ...... +"+"+"+"t'"t'"+'"~-"~ ..... t~~"-¥-+ ...... ~.--~.--~.--~---+.-.~---~.-.~...~ ..... ~ ~ ~-~ kY ~ ~ ~ ~ ~ T'"r']'"?"?'r"t'"r"'*"'~"'?'r'T'~"'?"+'"~ ...... + ...... ,"'?~'"?"r"'+'"+"' -4,4...t-f..4...h.~...t...t ....... ~-~.$J...t. LL..t.: ....... ~...~.~...L..t.LL.: ..... ~..: ~ ~ ~ ~ ~ ~ ~ ) ~ ~ ~ J ~ ~ j/~ i ~ ~ ~ f ~ ~! ; ~ ~ ~: ~ ~ /~: ~ i ---f-..~.-.;...; ..... t.-¢-..L.~ ..... ~.-L..¢...L..L..L.~_L..~ ...... ~..L..J..~._~ ~ ~ T T"r'T'T'T"T"T?"!-r't'"t-z-"t-.-t...t...t--.+ ...... t--+.+-+..)...*..-+..-$-f ...... +...f.--~.-~...).--:...¢...~...~ ....... i.-L.¢...L~...,...t..+._ --)-~..~..L.-~t...t.-.t....-4... ~ ~ ~ , T; ~ t ~ ~ ..... r'?"?--~ ....... T'"t'"T'"; ...... t'"r'T": ...... +"'f'"t'--t---+-+--t--+-....+.+.-~.-.~-.-'...~...~.. ~ ~ .~...:...¢...t ...... ;...t..4.., ...... t...t..4...¢.. ~ ~ ~ ': ': ; ~ ; ~ : i ~ ~ ~ ~ [ ~ ~ ; '. ~ ~ ~ ~ ~ ~ ~ '. t ~ ~ ~ ~ ~ ~ ' "?'T"g"~ ...... ~'"T-T"T-T-T-~-+.., ...... +...+..-?+...{-.*..-+..+..! ...... +-..+---~-+-+..g..4...~-4 .... --.+-+.4--.+ ..... M-4--.;- ..4.--~...~-.i-4.4..L~...]..LL.~ ...... i.i]]i~i]]Ll~]]]i i!"?'t'"~'"t't'"t't-~"~'"?+'"k¥+'+-'~ ...... ~"'+"';"'+ ....... ~...~-~...~......;..-~..4.-+4...;...,...~..~...q -+.+--¥.+ ....... ~.--~.-.~-.-~..-.*--.4--4...~..4...~-:...~.....L.¢..i-; ~; ~ ~ .... ~.x~ ~ ~ ~"T"?~"T"??r": ...... *'"r'r't-"t--'t"-~-"+..* ...... +-+..?+ ....... ~.-+...~...: ....... ¢...~...~-;..,;..4-~..~...:... -?"T-t"'t'"'"T"t"~-~ ...... +"~-'*'"~ .... ~"'~'"~.--' ' ' ' ...-~...~.--~-.-*.--.4 $.~-: ~ .~..~.~ ~_~ _~.. ~ ' ~' [ : ' : ~ ~. ~.~ t T T T' :~[:$::~::j:::::[:::~:Z:i:: :::::::::::::::::::::::::::::::::: d:::t]::2J:::?;::~t :t~:::f?"?'~f-'~'"'~'"f-"}-H-..~.4 ..... f.-i.--f-..f.4---;...f..-+.-.: ...... ~...t...¢44 4...~...~.4 ....... f...~...~...~ ...... ,M-H--+-.~..+-+.+--+ ...... ;-..~..,f.-.f,..~4..4.-.t-~ ...... ~...~_4...t...~..~...~...~_.: ....... i...~..~...t...~i~Z[~...:...:._:17' -'?'~-t-t-~'"t"~--t"-t'-'?--t't'r-T-.-~...+..+,.t ....... t.-.f-+...+ ...... H--?..f ...... +-+-.+-.~--- '-'t~-J-'f'-"J'"}'"H ....... ~..~...~-:..-)...~...¢...~.....L.~...L.L.t...L..L.~..~ i ~ i ~ )~]~]]~]] ~T[ ] '?t'"t ..... ?'?"T"'?T"T'"?r"t ..... t'"t'ff"'? ....... t"'t'"t"¢ ...... t'"t'"t-'t""?t-'f'7 ~ ~ ' ~ ~ ~ ~ ~}~ ~1~~.,, ~'~:: ~ ' ~ ~ ~ : , ~ ~ ~ :: ~~ :~ ~ "~.._T T i ~ i l' T T T T ~' T'"T'"T'T -t-? ~ 't ....... T'7"'t'"T ...... r'7"7" -+'t ~:~ ~"r"t-+--+ .......+'"~"+'+-t'+-+-~ .........~...~...:-.4...~-~--.~...~...~.....4...~..t...~ ...t...~...t..u.~ ~ , :~ ....~ ~ ~ ~ ~ ~ ~ ~ } ', ~ , ' ) , ~ ~ :- --.f-,-b-.f.--~.-+-.~.--~...~.-.t ....... t-.~...~...~-t...~...;...~.....l...~]l. T T i T i T "Z"T"'?'T"'("rT"t"~'""'~"T'"t"'t" ~'t"+"+ ..... +"'+-+'"+"-)"+'+'-+...f ...... ~..+..¢...~ ...... ~--.f...f..-~ ....... ¢...t..~..¥..4...~,..~...Z ....... ~ : ~ ~ ~ : ~ ~ : : : : ~ ~ ~ : T ~ T ~ : t : t "t "?'t'"t ...... t'"t"'""~ ....... +..-*..-*..-, ...... ,.-'...~...~ ....... ~...~,..'..' ~ . ~ ' : : : , ~ ' ~ : [ : : ~ · "?'TT'?'T"?"t-r~'"t't'"t---t-T-t-t--~..--mnnn}..-+.--?f--f.-, ?-f--.f.-~---),.+-+-..f.-f ....... h.H...h.~]-....~-~,..~..i]f]][] ] ~z~ ~ ~] ~ ~ ~ :2ii]it: ' ' ' ' ........ ~ .......... : · ' ' i ' : .... ~ ~ ~ ~, · : ~ ' T t T --.¥.b.¢...¢...t-..¢..-f...t..-t.-.~...¢...t...t...~...t.t...tk ....... ' ..... ~.4...~...~]...t...t..t...z ..... t.t.~...~ ..... ~: ~ ~ ~ ~ rI ~ ~ ~-~,~ ~ t :. ~ ~ ~ ~ j] ~ ~ ~ ~ ~ , ~ ,[J, , .: : -f'++-'+ .... ~+-h.f---:~.--h+.-f.--)--~--¥--~~ 4-b-f--.f...f...f-4..+.~ ...... +...f...~...~...~,i]]i[Z ]i~i]]i.]]]~]] ]~:'"t't' "t'"t'"¢'"¢ ....... t'"f'"t-'t ...... t'"t'"? ....... t'?'¢"~ ...... -'r'??'~'"t-?f-t'-f--+.+-.~-f .... +--+--~..).--f-¥.+...f ...... :...¢...:...: ..... ¢...~...~...~ ....... ~...~ ~ ~ ....... L.~...L.L. ~= : ~ '?-T ...... T'"?'?"t ...... *'"r"t"'t ...... ~-'~ ..... t ....... t-t-~"= ...... ?r"t"')"' ~]t i F'~'~"'~-~ '"?'¥~ ..... ~'"?'~'":'"r"T"T'T"F-t"'~'"~-?'-?'?"+-+ ...... +-+'~-+'":-*-~'"¥';'"~"4-~'"~-~-~''4"'¢-~'-4--* ~ ;~ ~ ~ ~ ~ ; ~ ~ ~ ~ ~ ~ 4 : ' ~ : ~?"'~-"'T'T'T"~ ....... ~"'T"?'~ ...... ~'"7-'~' -~B~B~'-t"~'"~'" "'*"'?+'"~ ....... ~'"~"'~ ....... ~-~"+¥'"k"~'"~--¢"+ ....... ~..¢..4-;.-..-;---~.]...~...~...~..~...~...~..] ]1][]]~: ~ [ ~ ~ ~ ~ ~ ~ i : ~ : : , ~ : . : . , . . , . .'" '"t'"c"t .......... ~t...t..+-.~.-.t.-.,.-.t-..~ ...... t...~..~ '.-~--~-..~.--~...~ ...... t f .h..: : : : : : : ~ : ~ : : : ~ ; : -~---~--~f ...... ).-4--~.~... ~-~..4...4 ..... $.-.~...$...~ ...... h..~...:...~ ....... ~ 4 J J . ~ ' i ~ ...... ) t ....... t--'?-t...T ...... t"'t'"t'"t ....... t"'t"'t .............. t .............. ~-T'"$ ,..~.4..~.: ...... ~.~.4 ~ .?...~ ~ ~ ~ ~ , T ~ T ~'"I"T'"T'"T'"T ...... ??"?"t-i'"t'"T'"T'"~'"-'?-t-T"f ..... f-+"+'"f ..... f'"f'"t'"~--'t..¥.¥~--.; ...... ~-.~..¥-~.-~...~-..~...~-..~ ..... ~-.~..~..~ ..... ;_~ ~ ~ G~ ~ L ~ ~ ~ t : t t'"t ....... t-'t"'t'"t"' ,"'t'"~'"t'"t"'T'"t'-t'"?"t ........ ?"?"t ..... ~'"f'"i"~ ....... ~-.-~.--~-.-~ ..... ;...~---~.-~ ....... ~...4.-.~...i ..... ~ ~ ~ ~ ~ ~ ~ ~ J ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ L : ~T"T'"~ ..... T"T"T'"t ....... t'"t"'t'"t'":'-t-'t"'t"'t ...... t'--t'--?'i,.-)--.~.-+.+--+ ...... )'"~'"t'-'t-.-~-+..H..+.~..+--~.-.~---~ ....... ~...4-..~--.~ ....... ~..~...:..~..~]...:..:,..~.. ~ .~..~.~ ~, ~: .~ .... ~;: .:.,., ~ ~:: ~-.p.~...L.L.L.~_L~ ..... ~ ~ ~ T ~ ~ T ]] ...... ~"?'T"]'"~'"T'"T"T"T ....... T"'T"T"?'T'"t-t':t'"t ...... ~"~'"f-~ ...... e-+..+.-~ ...... ~-¥.-+..¥.~-~-..~...~-.~...;...~...¥.~...~ ....... ;...~...~...~ ...... , : [ : : . ~ ~ ~ t [ t / t ....... T"?'"t'"T"' ~'--?'?'--t'"t ....... t'''*'''*'''~ ..... ~ *- ~' * ..... ~'--%.--~.-~ ....... ~..*~... '...' : : ; - : : : : : ; ; ~ : . T J " : : ~ : · ~-~-~-~e--+ .... ~-.+~-4.--~..~-~-~-4 ..... ?-~..~.L..~..~ ~ _~ ~_~. ~..~ ~ ~ ~ ~ ~ T T ..... T'-t-T'"t'"t'"t'"t'"t'"t ...... t'"T'"T"'T ....... T'"t"','"t ....... ~'"~"+-'+-~...+.-+..~...~ , ~J 'T T'T"T ....... t t t'"t'""~-T"t-t ..... t'"t'"T-t"'"~"?? '-~-~--~-~ ....... ~-~--~4.~...~-~...~_~ ..... ~..~...~...~...L.h..: . ~ ~ ~ : : : ~ : : ~ ] :. ~' ': ~ ~ ~ , ~'-T"t"~ ...... t-t-t'"t ..... t-.t..~-..~ ....... f.--~-.-~-.-~-.-~-~.-.~...+...f ...... ~---~..-~--.?-~..?-4-~..-~..~..~.~..~.]...~ : ~ ~ ~ ~ ~ ~ ~ ~ / T ?T'"T ....... t'"T-t'"T'"f'"?*'"T"'T ..... t'","~"'t ....... t-'~'"t'-~'-'~ ( ?-t-~+-' "'+'+'+-+-.~-~..+---%-~..~.--~ .....~.~-.~..~-, .,.~...~..~.4-~_~. ~.. ~ ~_.~. ~ : T '"?t-t'"t'"~'"T'"?'T-T"T-T'"r"r"~ ...... ~'-~"(-"?t.-t--.?.?.-t ...... ~-..?-?-~......~.-~...+.-+..-] -~.~._,..+_~..~.~...$.~.~_, : ~ J ] J_ ~ ~ ~ i ~ ~ ~ ~ i ~ ~ T"t-T-t ...... T'"T'"t-'t ..... T"-t~...?t.--r-~...~.-.+ ...... +...~.--~-..?f..+..+-.+..., ...... +..-~...+...f ...... ~ ~ I ~ ] ~ ~T T T T T ~"-~T~'-T-T-7 ~]~ ~ t + ="t"~"-'t'~-f'? ...... '..-~-~-.-+..?.~-..+ ...... ~...¥+..~ ~ ~-~; ...... :.4...~..., ....... ~...i..+..t... ~ ~ ~ ~ ':-f [ ?' -.~?'~ ..... ???'"+ ..... +'"+-~'~--"~ - --~ .... f : f ~-.~-.~.~ ...... :..h.~.. :.. ~ ~ ~ ~ I ~ : ~ : ~ ~ ~ ~ :: ~ [ ~ ~ ~ ~ ~ ~ ( -T'-T-'T"] ....... ??"~'"~"' F"~'"t-~'"~ ...... t"¥'¥'+ ..... +...+...~..~.,.4...~.~-.~-~-.~..~... k...~ ~ ~ _~ 4..~.~. ~...~ ~ ~ ...~...T'T"T'" ""T'"T'"?"T'"~ "'T'"T"""'T'" ""T'"T'"T'"T'"~'"T'"?"t'"T ...... ?'?"?'t'- ] '~--~ ...... ~-.+-4-~.-~4-4~ ..... ~_~_~ ,_ ~&~: ! ~ ~ i ~ / J , T T t t"'T"T ....... t'"T"'r"t ....... T'"r"t'"T ....... t.-.,..-t .............. ~"'t."t ....... ~...~...* ...... i -'t'"t--t---~-.-.-t-~--.~ .......... ~---~--.~...~---~---~...~.-~-~~ ~ : ~ J ~.~_] ~ ~ ~ J ~ ~ ~ ..... t ....... T'"t' ~-t ..... T.-~-..t.-.t ..... -t-4~' ~+.+.---++4-+-~-~-+-~ ....~4.-N- J~' ~ ~,].~.~...L~..~. '.~: ~ ~' '.~ ~i~ ' -~-+..+-.~-....+--~-.~...~ ....... ~...~...~-~..~...~...~_~..~... _~.~_? ~ . : :_ ~_ ~_ ~ ~ ~ i i ~ ~ ~ ~ / ..... ?~"'~'~" '"~'"T"t"'r" '"~ ..... t"'t ....... t...t-.t-t ...... t-?.+.~...t-.+.--~...t...+- ; : ; ~i ~ ~ i : ~ ~ : : : · ~T ~ T ' ~'~'"-~--~*.~..?..~-*-..*---,..-. ...... ,-.-~-~...~...~..~...,...' ....... ~ · ' : : :; : : - : ; ~ ~'"~'T-'t ..... T'"t'"~"t ....... ?"*'"t'"t"'~'--+'--~-.+--.~ ....... ~--.~-..~-..~ ....... ~'"~'"~'"~"' "~--~-"~--~.-..-m~ ....... ~...~-.~ ...... L.L.L.?...~...~...: ~ ~ : T ~ t ~ T T T't T ....... T'"T"?"T ...... T'"?T'"T''' '-~+'~-~ .....~'~"'~'~"-~---~-~.-~ -~- ...~-L.L.~..~ '~ ~'"~ , ~ ~ ~ ~'?:?'t-~'"T'"T-'T ...... t"'t'"t"'t't"?"r'f'? ...... ~"'~'"t"'t'"t'"~'"?'~-'~ ...... ?'+'"~'"~"t-~...*...~-.~ .... -+~4...~--~-~-~.~-.-b.~-~...~-~L~.~ ~ ~ i~ ~ ~ ~' ~?'~?"T~"?T'"?'"~'"r"t"'t-t'"T'"t'"t'"+ ...... ?t-.+...+...~...~...~...~..~ ...... ~...~...t...~...~-~-..~...~-..~ .... · ~ ~ : ~ ~ ~ ~ ~ ~ ~ it ~ ~ ~ ~ Jl ~!]!i]] ~'T-'T ......... T'"~ .......... T"T"~ ..... ?'T"t'"t"T~t'"t'"t'"t ....... ~'-~'"+'"T'"f'"t'"~'"t'"~ ...... ~...+...;...~...~--+...~...~...4 ...... ~...~...'......-~-.~-.~-.L.~ .... 298, ,--, PROdECTION ON VERTICAL PLRNE 298. - 118. ~"ALEn IN VERTICRL DEPTHS HORIZ SCALE = 1/1000 IN/FT 7°-- ?/ GREAT LAND DIRECTIONAL DRILLING, INC. REPORT OF SUB-SURFACE DIRECTIONAL SURVEY BP EXPLORATION COMPANY WEST EILEEN # Z-05 WELL NAME WEST EILEEN, ALASKA LOCATION AL 790 D24 MWD 7/19/90 JOB NUMBER TYPE SURVEY ~~-T'D~E~ DIRECTIONAL j~ .......... .... __ NAME TITLE SIGNATURE 490 FT 9609 DEPTH INTERVAL FROM TO 7/04/90 7/15/90 DATE SURVEY TAKEN FROM TO THIS IS A RECORD OF A SUB-SURFACE SURVEY OF YOUR WELL WE HAVE RETAINED A COPY OF YOUR SURVEY REPORT IN OUR FILES FOR YOUR CONVENIENCE; HOWEVER, SHOULD YOU SO DESIRE, ALL COPIES OF THE SURVEY REPORT WILL BE FORWARDED TO YOU ON WRITTEN REQUEST. ALL SURVEYS ARE KEPT IN A LOCKED FILE AND ARE HELD IN STRICTEST CONFIDENCE. GREAT LAND Client .... : Field ..... : Well ...... : Section at: Engineer..: DIRECTIONAL~DRILLING, BP EXPLORATION WEST EILEEN, ALASKA WEST EILEEN # Z-05 N,58.44,W LYNN HENSLEY S MEAS C DEPTH 3 490 3 1002 3 1443 3 1934 3 2467 INCLN VERTICAL-DEPTHS ANGLE BKB SUB-SEA 0.00 490.0 397.5 0.25 1002.0 909.5 0.50 1443.0 1350.5 0.50 1934.0 1841.5 0.25 2467.0 2374.4 3 2877 3 3021 3 3116 3 3209 3 3303 0.40 2877.0 2784.4 2.40 3020.9 2928.4 5.10 3115.7 3023.2 6.90 3208.2 3115.7 9.30 3301.2 3208.7 3 3397 3 3491 3 3585 3 3679 3 3774 11.30 3393.7 3301.2 13.10 3485.6 3393.1 15.90 3576.6 3484.1 19.00 3666.2 3573.7 20.90 3755.5 3663.0 3 3866 3 3961 3 4055 3 4149 3 4254 23.20 3840.8 3748.3 25.10 3927.5 3835.0 27.10 4011.9 3919.4 29.80 4094.5 4002.0 30.90 4185.1 4092.6 3 4349 31.40 'Survey Codes: (WZ05D) 4266.4 4173.9 3/MWD INC. 07/20/90 Computation...: RADIUS OF CURVATURE Survey Date...: 07/20/90 RKB Elevation.: 92.51 ft Reference ..... : AL790D24 Magnetic Dcln.: 30.00 E RECORD OF SURVEY (Well assumed vertical to 490 MD) SECTION DIRECTION RELATIVE-COORDINATES DISTNCE BEARING FROM-WELL-HEAD 0.0 S 0.00 W 0.0 N 0.0 E -0.4 S 19.00 W 1.1 S 0.2 W 1.5 N 12.00 W 1.0 S 2.3 W 3.6 N 16.00 E 3.3 N 2.2 W 4.0 N 33.00 E 6.4 N 0.7 W CLOSURE DL DISTNCE BEARING /100 0.0 N90.00E 1.1 S 9.50W 2.5 S67.38W 3.9 N33.55W 6.5 N 6.46W 0.00 0.05 0.06 0.00 0.05 2.3 S 3.70 E 6.0 N 1.0 E 3.6 N 60.00 W 4.5 N 1.5 W 9.8 N 57.90 W 7.7 N 6.8 W 19.5 N 59.30 W 12.7 N 15.1 W 32.8 N 56.80 W 19.8 N 26.3 W 6.1 N 9.28 E 4.7 N 18.10 W 10.2 N 41.47 W 19.7 N 49.81 W 32.9 N 53.11 W 0.04 1.40 2.84 1.94 2.55 49.6 N 58.90 W 28.7 N 40.5 W 49.7 N 54.71 W 2.13 69.4 N 59.30 W 38.9 N 57.6 W 69.5 N 55.97 W 1.92 92.9 N 66.80 W 49.6 N 78.6 W 92.9 N 57.76 W 3.04 120.8 N 66.30 W 60.8 N 104.4 W 120.8 N 59.80 W 3.30 152'. 9 N 66.70 W 73.7 N 134.1 W 153.0 N 61 . 22 W 2.00 187.1 N 64.20 W 88.0 N 165.5 W 187.5 N 62.00 W 2.54 225.9 N 61.80 W 105.7 N 200.2 W 226.4 N 62.17 W 2.05 267.1 N 62.80 W 124..9 N 236.8 W 267.7 N 62.19 W 2.14 311.8 N 62.50 W 145.5 N 276.6 W 312.5 N 62.25 W 2.87 364.5 N 67.40 W 167.9 N 324.6 W 365.5 N 62.65 W 1.62 413.0 N 67.70 W 186.7 N 370.0 W 414.5 N 63.23 W 0.53 WEST EILEEN # Z-05 S MEAS INCLN C DEPTH ANGLE 3 4443 31.70 3 4538 32.50 3 4631 33.00 3 4725 33.40 3 4819 33.60 3 4913 33.50 3 5007 33.10 3 5109 33.20 3 5202 33.20 3 5296 33.00 5484 32.30 5586 32.20 5679 32.70 5773 33.10 3 5866 33.60 3 5960 34.20 3 6054 34.50 3 6147 34.90 3 6244 35.20 3 6336 35.20 3 6428 35.00 3 6524 34.70 3 6617 34.90 3 6711 35.20 3 6804 35.10 VERTICAL-DEPTHS BKB SUB-SEA 4346.6 4254.0 4427.0 4334.5 4505.2 4412.7 4583.9 4491.4 4662.3 4569.8 4740.6 4648.1 4819.2 4726.7 4904.6 4812.1 4982.4 4889.9 5061.2 4968.6 5140.1 5047.6 5219.3 5126.8 5305.6 '5213.1 5384.1 5291.5 5463.0 5370.5 5540.7 5448.2 5618.7 5526.2 5696.3 5603.8 5772.8 5680.2 5852.2 5759.7 5927.3 5834.8 6002.6 5910.1 6081.4 5988.9 6157.8 6065.2 6234.7 6142.2 6310.8 6218.2 RECORD OF SURVEY (Well assumed vertical to 490 MD) SECTION DIRECTION RELATIVE-COORDINATES DISTNCE BEARING FROM-WELL-HEAD 461.5 N 68.10 W 205.2 N 415.6 W 511.2 N 68.80 W 223.7 N 462.5 W 560.7 N 69.10 W 241.8 N 509.5 W 611.3 N 68.80 W 260.3 N 557.5 W 662.3 N 69.10 W 278.9 N 606.0 W 713.4 N 68.80 W 297.6 N 654.4 W 764.2 N 68.80 W 316.3 N 702.6 W 819.0 N 69.10 W 336.3 N 754.6 W- 869.1 N 68.40 W 354.8 N 802.1 W 919.7 N 68.40 W 373.6 N 849.8 W 970.0 N 68.40 W 392.4 N 897.3 W 1019.8 N 67.70 W 411.4 N 944.2 W 1073.5 N 68.80 W 431.5 N 994.7 W 1122.5 N 69.10 W 449.4 N 1041.3 W 1172.7 N 69.10 W 467.7 N 1089.0 W 1222.9 N 69.50 W 485.7 N 1136.8 W 1274.4 N 69.50 W 504.1 N 1185.9 W 1326.5 N 69.10 W 522.8 N 1235.6 W 1378.5 N 69.10 W 541.7 N 1285.0 W 1433.3 N 68.80 W 561.7 N 1337.0 W 1485.5 N 68.10 W 581.2 N 1386.3 W 1537.7 N 67.70 W 601.1 N 1435.3 W 1591.8 N 67.40 W 622.1 N 1486.0 W 1644.3 N 66.70 W 642.8 N 1534.9 W 1697.7 N 66.70 W 664.1 N 1584.5 W 1750.8 N 66.00 W 685.6 N 1633.5 W Page 2 07/20/90 CLOSURE DISTNCE BEARING 463.5 N 63.72 W 513.8 N 64.19 W 564.0 N 64.61 W 615.3 N 64.97 W 667.1 N 65.28 W 718.9 N 65.55 W 770.5 N 65.76 W 826.2 N 65.98 W 877.0 N 66.14 W 928.3 N 66.27 W 979.3 N 66.38 W 1029.9 N 66.46 W 1084.3 N 66.55 W 1134.2 N 66.65 W 1185.2 N 66.76 W 1236.2 N 66.86 W 1288.6 N 66.97 W 1341.6 N 67.06 W 1394.5 N 67.14 W 1450.2 N 67.21 W 1503.2 N 67.25 W 1556.1 N 67.28 W 1611.0 N 67.29 W 1664.1 N 67.28 W 1718.0 N 67.26 W 1771.6 N 67.23 W DL /lOO 0.34 0.87 0.55 0.44 0.23 0.14 0.43 0.13 0.23 0.21 0.21 0.57 0.32 0.55 0.43 0.55 0.64 0.35 0.43 0.33 0.25 0.26 0.33 0.33 0.32 0.27 'Survey Codes.: 3/MWD WEST EILEEN # Z-05 S MEAS INCLN C DEPTH ANGLE 3 6898 35.30 3 6992 35.20 3 7086 34.50 3 7180 35.00 3 7274 35.30 3 7366 '35.60 3 7450 36.40 3 7544 36.70 3 ' 7638 37.10 3 7737 37.50 3 7825 38.00 3 7926 37.40 3 8019 37.10 3 8114 36.60 3 8203 36.50 3 8300 36.50 3 8395 35.90 3 8488 35.20 3 8665 34.70 3 8758 34.70 3 8853 34.60 3 8946 34.50 3 9041 33.20 3 9135 32.30 3 9227 32.30 3 9321 32.70 VERTICAL-DEPTHS BKB SUB-SEA 6387.6 6295.1 6464.3 6371.8 6541.5 6449.0 6618.7 6526.2 6695.6 6603.1 6770.5 6678.0' 6838.5 6746.0 6914.0 6821.5 6989.1 '6896.6 7067.9 6975.4 7137.5 7045.0 7217.4 7124.9 7291.4 7198.9 7367.4 7274.9 7438.9 7346.4 7516.9 7424.4 7593.6 7501.1 7669.2 7576.7 7814.3 7721.8 7890.8 7798.3 7968.9 7876.4 8045.5 7953.0 8124.4 8031.9 8203.5 8111.0 8281.2 8188.7 8360.5 8268.0 RECORD OF SURVEY (Well assumed vertical to 490 MD) SECTION DIRECTION RELATIVE-COORDINATES DISTNCE BEARING FROM-WELL-HEAD 1804.5 N 65.30 W 707.9 N 1682.9 W 1858.4 N 64.20 W 731.1 N 1732.0 W 1911.9 N 64.20 W 754.5 N 1780.3 W 1965.2 N 63.20 W 778.2 N 1828.4 W 2019,~2 N 63.20 W 802.6 N 1876.7 W 2072.4 N 62.80 W 826.8 N 1924.2 W 2121.6 N 61.10 W 850.0 N 1967.8 W -2177.6 N 60.70 W 877.3 N 2016.7 W 2234.0 N 59.90 W 905.2~.N 2065.7 W 2294.0 N 57.50 W 936.4 N 2117.0 W 2347.8 N 56.80 W 965.6 N 2162.2 W 2409.6 N 56.50 W 999.6 N 2213.8 W 2465.8 N 56.50 W 1030.6 N 2260.8 W 2522.7 N 55.80 W 1062.4 N 2308.1 W 2575.7 N 55.10 W 1092.4 N 2351.7 W 2633.2 N 54.40 W 1125.7 N 2398.9 W 2689.2 N 53.30 W 1158.8 N 2444.2 W 2743.0 N 53.00 W 1191.3 N 2487.4 W 2844.0 N 53.30 W 1252.1 N 2568.6 W 2896.7 N 53.00 W 1283.8 N 2610.9 W 2950.3 N 49.80 W 1317.5. N 2653.1 W 3002.3 N 47.70 W 1352.3 N 2692.8 W 3054.2 N 47.30 W 1388.0 N 2731.8 W 3104.1 N 47.30 W 1422.5 N 2769.2 W 3152.4 N 48.40 W 1455.5 N 2805.6 W 3202.1 N 47.30 W 1489.4 N 2843.1 W Page 3 07/20/90 CLOSURE DISTNCE BEARING 1825.7 N 67.19 W 1879.9 N 67.12 W 1933.6 N 67.03 W 1987.1 N 66.94 W 2041.1 N 66.85 W 2094.3 N 66.75 W 2143.5 N 66.64 W 2199.2 N 66.49 W 2255.4 N 66.34 W 2314.8 N 66.14 W 2368.1 N 65.94 W 2429.0 N 65.70 W 2484.6 N 65.49 W 2540.8 N 65.28 W 2593.1 N 65.08 W 2649.9 N 64.86 W 2705.0 N 64.63 W 2758.0 N 64.41 W 2857.5 N 64.01 W 2909.5 N 63.82 W 2962.3 N 63.59 W 3013.3 N 63.33 W 3064.2 N 63.06 W 31~13.2 N 62.81 W 3160.7 N 62.58 W 3209.6 N 62.35 W DL /lOO 0.33 0.40 0.74 0.64 0.32 0.36 1.19 0.35 0.53 0.99 0.64 0.60 0.32 0.59 0.30 0.26 0.75 0.76 0.29 0.10 1.09 0.73 1.37 0.96 0.34 0.55 'Survey Codes: 3/MWD WEST EILEEN # Z-05 MEAS INCLN DEPTH ANGLE 9415 33.10 9510 32.60 9609 31.40 RECORD OF SURVEY (Well assumed vertical to 490 MD) VERTICAL-DEPTHS SECTION DIRECTION RELATIVE-COORDINATES BKB SUB-SEA DISTNCE BEARING FROM-WELL-HEAD 8439.4 8346.9 8519.3 8426.7 8603.2 8510.7 3252.0 N 45.60 W 3302.1 N 44.20 W 3352.7 N 42.10 W 1524.6 N 2880.1 W 1561.1 N 2916.4~W 1599.3 N 2952.3 W ~Survey Codes: 3/MWD Page 4 07/20/90 CLOSURE DL DISTNCE BEARING /100 3258.7 N 62.11 W 0.69 3308.0 N 61.84 W 0.68 3357.7 N 61.55 W 1.34 WEST EILEEN # Z-05 Page 5 07/26/90 DATA INTERPOLATED FOR 100 FT SUBSEA INTERVAL (Well assumed vertical to 490 MD) SUBSEA MEAS INCLN DEPTH DEPTH ANGLE 400 493 0.00 500 593 0.05 600 693 0.10 700 793 0.15 800 893 0.20 TVD BKB 493 593 693 793 893 MD-TVD VERT DIRECTION RELATIVE COORDINATES DIFF CRRT BEARING FROM WELL HEAD 0 0 S 19.00 W 0.00 S 0.00 W 0 0 S 19.00 W 0.04 S 0.01 W 0 0 S 19.00 W 0.17 S 0.06 W 0 0 S.19.00 W 0.38 S 0.06 W 0 0 S 19.00 W 0.68 S 0.11 W 900 993 0.25 993 1000 1093 0.30 1093 1100 1193 0.36 1193 1200 1293 0.41 1293 1300 1393 0.47 1393 0 0 S 19.00 W 1.06 S 0.18 W 0 0 S 49.58 W 1.45 S 0.43 W 0 0 S 83.37 W 1.70 S 0.93 W 0 0 N 62.84 W 1.65 S 1.56 W 0 0 N 29.06 W 1.27 S 2.13 W 1400 1493 0.50 1493 1500 1593 0.50 1593 1600 1693 0.50 1693 1700 1793 0.50 1793 1800 1893 0.50 1893 0 0 N 9.18 W 0.54 S 2.40 W 0 0 N 3.47 W 0.33 N 2.49 W 0 0 N 2.23 E 1.20 N 2.50 W 0 0 N 7.93 E 2.07 N 2.43 W 0 0 N 13.64 E 2.92 N 2.26 W 1900 1993 0.47 1993 2000 2093 0.43 2093 2100 2193 0.38 2193 2200 2293 0.33 2293 2300 2393 0.28 2393 0 0 N 17.87 E 3.75 N 2.03 W 0 0 N 21.06 E 4.49 N 1.76 W 0 0 N 24.25 E 5.13 N 1.49 W 0 0 N 27.44 E 5.69 N 1.21 W 0 0 N 30.63 E 6.15 N 0.93 W 2400 2493 0.26 2493 2500 2593 0.30 2593 2600 2693 0.33 2693 2700 2793 0.37 2793 2800 2893 0.62 2893 0 0 S 19.49 W 6.40 N 0.66 W 0 0 S 33.36 E 6.44 N 0.22 W 0 0 S 86.21 E 6.93 N 0.25 E 0 0 N 40.93 E 7.84 N 0.33 E 0 0 S 9.67 W 5.85 N 0.97 E 2900 2993 2.01 2993 0 0 N 84.41 W 4.51N 0.55 W WEST EILEEN # Z-05 Page 6 07/26/90 DATA INTERPOLATED FOR 100 FT SUBSEA INTERVAL (Well assumed vertical to 490 MD) SUBSEA MEAS INCLN DEPTH DEPTH ANGLE TVD BKB MD-TVD VERT DIRECTION RELATIVE COORDINATES DIFF CRRT BEARING FROM WELL HEAD 3000 3093 4.44 3093 3100 3193 6.59 3193 3200 3294,, 9.07 3293 3300 3396 11.27 3393 3400 3498 13.31 3493 58.41 W 6.66 N 5.14 W 59.06 W 11,79 N 13.49 W 57.03 W 18.98 N 25.13 W 58.87 W 28.57 N 40.34 W 59.87 W 39.72 N 58.99 W 3500 3602 16.45 3593 3600 3707 19.56 3693 3700 3814 21.89 3793 3800 3922 24.33 3893 3900 4033 26.64 3993 4000 4147' 29.73 4093 4100 4263 30.95 4193 4200 4380 31.50 4293 4300 4497 32.16 4393 4400 4616 32.92 4493 9 3 N 66.71 W 51.37 N 82.80 W 14 5 N 66.42 W 64.45 N 112.83 W 21 7 N 65.62 W 79.55 N 147.38 W 30 9 N 62.77 W 98.20 N 185.92 W 41 11 N 62.57 W 120.40 N 228.06 W 54 13 N 62.51 W '144.94 N 275.53 W 70 16 N 67.43 W 169.63 N 328.68 W 87 17 N 67.83 W 192.73 N 384.78 W 105 18 N 68.50 W 215.79 N 442.20 W 123 19 N 69.05 W 238.87 N 501.79 W 4500 4735 33.42 4593 4600 4855 33.56 4693 4700 4975 33.24 4793 4800 5095 33.19 4893 4900 5214 33.17 4993 143 19 N 68.83 W 262.36 N 562.83 W 163 20 N 68.98 W 286.12 N 624.69 W 183 20 N 68.80 W 309.96 N 686.30 W 202 19 N 69.06 W 333.47 N 747.23 W 222 20 N 68.40 W 357.18 N 808.21 W 5000 5333 32.92 5093 5100 5452 32.47 5193 5200 5571 32,22 5293 5300 5689 32.74 5393 5400 5808 33.29 5493 241 19 N 68.40 W 381.13 N 868.70 W 260 19 N 67.94 W 404.93 N 928.44 W 278 18 N 68.63 W 428.53 N 987.06 W 297 18 N 69.10 W 451.38 N 1046.38 W 316 19 N 69.25 W 474.52 N 1107.06 W 5500 5928 34.00 5593 336 20 N 69.50 W 497.88 N 1169.34 W WEST EILEEN # Z-05 Page 7 07/26/90 DATA INTERPOLATED FOR 100 FT SUBSEA INTERVAL (Well assumed vertical to 490 MD) SUBSEA MEAS INCLN DEPTH DEPTH ANGLE 5600 6049 '~ 34.49 5700 6171 34.97 5800 6293 35.20 5900 6416 35.03 6000 6538 34.73 TVD BKB 5693 5793 5893 5993 6093 MD-TVD VERT DIRECTION RELATIVE COORDINATES DIFF CRRT BEARING FROM WELL HEAD 357 21 N 69.12 W 521.91 N 1233.12 W 379 22 N 69.03 W 546.66 N 1297.90 W 401 22 N 68.42 W 572.11 N 1363.50 W 423 22 N 67.75 W 598.43 N 1428.79 W 445 22 H 67.30 W 625.03 N 1493.15 W 6100 6659 35.04 6200 6782 35.12 6300 6904 35.29 6400 7026, 34.94 6500 7148 34.83 6193 6293 6393 6493 6593 467 22 H 66.70 W 652.37 N 1557.23 W 489 22 N 66.17 W 680.39 N 1621.81 W 512 22 N 65.23 W 709.40 N 1686.08 W 534 22 N 64.20 W 739.68 N 1749.78 W 556 22 N 63.54 W 769.99 N 1812.02 W 6600 7270 35.29 6693 6700 7393 35.86 6793 6800 7517 36.61 6893 6900 7642 37.12 6993 7000 7768 37.68 7093 578 22 H 63.20 W 801.62 N 1874.74 W 601 23 N 62.25 W 834.12 N 1938.25 W 625 24 N 60.81 W 869.45 N 2002.75 W 650 25 N 59.80 W 906.50 N 2067.92 W 676 26 N 57.25 W 946.60 N 2132.93 W 7100 7895 37.59 7193 7200 8020 37.09 7293 7300 8145 36.56 7393 7400 8270 36.50 7493 7500 8394 35.91 7593 702 27 N 56.59 W 989.04 N 2197.90 W 728 26 N 56.49 W 1031.09 N 2261.46 W 753 25 N 55.55 W 1072.86 N 2323.45 W 777 24 N 54.62 W 1115.24 N 2384.16 W 801 24 N 53.32 W 1158.36 N 2443.55 W 7600 8516 35.12 7693 7700 8638 34.77 7793 7800 8760 34.70 7893 7900 8882 34.57 7993 8000 9003 33.72 8093 824 23 N 53.05 W 1201.11 N 2500.53 W 846 22 N 53.26 W 1243.02 N 2556.45 W 868 22 N 52.93 W 1284.53 N 2611.89 W 889 22 N 49.15 W 1328.07 N 2665.50 W 910 21 N 47.46 W 1373.75 N 2716.29 W 8100 9122 32.42 8193 930 19 N 47.30 W 1417.80 N 2764.07 W WEST EILEEN # Z-05 Page 8 07/26/90 DATA INTERPOLATED FOR 100 FT SUBSEA INTERVAL (Well assumed vertical to 490 MD) SUBSEA MEAS INCLN DEPTH DEPTH ANGLE TVD BKB MD-TVD VERT DIRECTION RELATIVE COORDINATES DIFF CRRT BEARING FROM WELL HEAD 8200 9240 32.36 8293 8300 9359 32.86 8393 8400 9478 32.77 8493 8500 9596 31.55 8593 948 18 N 48.24 W 1460.24 N 2810.95 W 967 19 N 46.61 W 1503.46 N 2858.12'W 986 19 N 44.67 W 1548.82 N 2904.44 W 1004 18 N 42.37 W 1594.49 N 2947.92 W WEST EILEEN # Z-05 Page 9 07/20/90 DATA INTERPOLATED FOR 1000 FT MEASURED DEPTH INTERVAL MEAS INCLN VERT-DEpTHS SECT DIRECTION REL-COORDINATES DEPTH ANGLE BKB SUB-S DIST BEARING 1000 0.25 1000 907 2000 0.47 2000 1907 3000 2.11 3000 2907 4000 25.93 3963 3870 5000 33.13 4813 4721 CLOSURE FROM-WELLHEAD DIST BEARING -0 S 19.00 W 1 S 0 W 4 N 18.11 E 4 N 2 W 3 N 78.04 W 4 N 1 W 243 N 62.21 W 114 N 215 W 760 N 68.80 W 315 N 699 W DL/ 100 1 S 9.50 W 0.0 4 N 27.80 W 0.0 5 N 9.91 W 1.4 243 N 62.16 W 2.1 767 N 65.75 W 0.4 6000 34.33 5652 5559 1296 N 69.33 W 512 N 7000 35'.14 6471 6378 1863 N~64.20 W 733 N 8000 37.16 7276 7184 2454 N 56.50 W 1024 N 9000 33.76 8090 7998 3032 N 47..47 W 1373 N 1207 W 1311 N 67.01 W 0.3 1736 W 1885 N 67.11 W 0.7 2251W 2473 N 65.53 W 0.3 2715 W 3042 N 63.18 W 1.4 and Di,"ecklonal Dpilling. Inc. <KB>O ~ 500 1000 t I t500 l ~ooo [ .... VERTICAL SECTION VIEW BP EXPLORATION NEST EILEEN # Z-05 SectiOn at: N 58.44 ~ TVD Scale.: ! inch = iO00 feet Oep Scale.: ! inch = iO00 feet Drawn ..... : 07/20/90 Harker Identification ND TVD SECTN INCLN A) KB 0 0 0 0.00 B) TI3 9609 8603 3353 3t.40 2500 3000 3500 4000 .: 45OO ' 5000 5500 6000 .... 6500 7000 7500 80OO 8500 9000 5OO t 500 t000 t500 2000 "25oo 3000 Section Departure 3500 4OOO 4500 5OOO Harker Identification ~ N/S A} KB 0 0 N 0 B} TD 9609 i599 N 2952 PLAN VIEN BP EXPLORATION NEST EILEEN # Z-05 CLOSURE ..... : 3358 ft N 6t.55 DECLINATION.: 30.00 E SCALE ....... : ! inch = 600 feet DRANN ..... -..: 07/20/90 3900 3600 3300 3000 2700 2400 t800 t500 i200 9OO 600 3O0 300 3300 3000 2700 2400 2i00 t800 i500 i200 900 600 300 0 300 <- NEST ' EAST -> PERMIT # ,,~ o _ wP, d° WELL NAME ,~ ,-,~, ~ ~ ~.u. CONTACT [ ............. ~ .................................. GEO'LO~ICAL ........ AOGCC ........ MATERIALS INYENTORY LisT [ c~,eCk of[ or list data as it is received ] j ~0~ !/-/~/~, I d,.... ,~".~ i ~' '.~x !'~ i ~"" t.~t~ ~i core desri~tion I , ~/~ .... , ~/~ ~ , .... ,/~ .... ,' ¢~z~ ( ,~, i LOG TYPE RUN INTERVALS SCALE 12] ii -J i) / ~.. c7.z&3'-/o/so' /, P, Poo/ - /o - ??.o, ~ C~")-O-'lc:o.~O BP EXPLORATION BP Exploration (Alaska) Inc. 900 East Benson Boulevarcl P.O. Box 196612 Anchorage. Alaska 99519-6612 (907) 561-5111 TO: DISTRIBUTION Date: 07/31/90 T#:81367 FROM: SUBJECT: Information Control Well Records LR2-1 BP CASED HOLE FINALS Enclosed is your copy of the material listed below. If you have any questions, please contact BP Well Records at (907) 564-4445. ~/B-11 TDT-P 07/23/90 #1 10890-11135 SCH v'B-11 TDT-P 07/23/90 #1 11851-11136 SCH ,~-14 PERF 07/21/90 #3 11550-12030 SCH /B-26 PERF 07/21/90 #1 11000-11237 SCH V"N- 16 PERF 07/24/90 #1 9180-9834 SCH ¢S-03 PERF 07/22/90 #1 11900-12160 SCH ~Z-05 GUN POiST REC 07/23/90 #1 9660-9900 SCH u"Z-05 CET 07/23/90 #1 9383-10204 SCH ,,Z-05 CBT 07/23/90 #1 9383-10180 SCH ~Z-05 COMPLETION 07/25/90 #1 9700-10145 SCH ¥Z-32 COMPLETION 07/25/90 #1 10695-11177 SCH 5" 5" 5" 5" 5" 5" 5" 5" 5" 5" Distribution: ARCO CHEVRON EXXON GEOSCIENCES MOBIL PhILlIPS RESERVOIR STATE OF ALASKA ARCHIVES . RECEIVED BP EXPLORATION BP Exploration (Alaska) Inc. 900 East Benson Boulevard P.O. Box 196612 Anchorage, Alaska 99519-6612 (907) 561-5111 TO: ARCO DATE: 08/03/90 EXXON T# 81465 PHILLIPS ~S-TA']~E~OE AL_AS__ K_A ARCHIVES SYSTEM T~pe ~, Transmittal Only BP MAGNETIC LIS TAPE & LISTING Enclosed is your copy of the material listed below. If you have any questions, please contact BP Well Records at (907) 564-4445. Z,-05 CN/GR 07/18/90 # 1 6970-10241 At las#4489 AP1#50-029-22056 1600bpi TP#07229 ***ARCHIVES ONLY: Information Control Well Records LR 2-1 J. Dietz/S. McCurry TO: THRU: FROM: MEMORANOUM State of Alaska ALASKA OIL AND GAS CONSERVATION COb~4ISSION Lonnie C. Smi~J~ Commissioner DATE: FILE NO: July 30, 1990 JT. BF. 730.3 TELEPHONE NO: SUBJECT: RIG/BOPE Inspection BPX PBU Z-5 Permit No. 90-78 Prudhoe Oil Pool Petroleum Inspe~ca~6-r~ Tuesday J~: I made a walk thru inspection of BOPE on AUDI rig 2~an-d ~-~quipment, except 90°L in the kill line, to be installed properly and appeared to be in good working order. The 90° L in the kill line wilI be replaced with a targeted T before next nipple up and test. Lewis Brown, BPX rep., requested a 1 day extension on the 7 day test regulation due to picking up tubing to complete the well. I agreed to, the 1 day extension. 02-00lA (Rev. 6/89) 20/ll/MEMO1.PM3 TO: THRU: FROM: MEMORAhOUM State of Alaska ALASKA OIL AND GAS CONSERVATION COI~-IISSION Lonnie C. Smi DATE: July 11, 1990 Commissioner / ~ FILE NO: JT. BF. 711.10 Bobby D. Fo~~~ Petroleum InspeCt ~ TELEPHONE NO: SUBJECT: BOP Test BPX PBU Z-5 Permit No. 90-78 Pruhdoe Oil Pool Friday, Saturday July 6 & 7, 1990: I witnessed the BOPE test on ~'U'D~I"'"'~ri-~-2--~ th~r-'a'b0ve da't~e'~. As the attached BOPE test report shows, there was one failure which was corrected and tested before I departed the location. In summary, I witnessed the BOPE test on BPX's Z-5. 02-00lA (Rev. 6/89) 20/11/MEMOl.PM3 OPERATION: Drlg~ Wkvr I1/ D~,, contrctr ~U~ - ~ .... - , , Location (general) Housekeeping (general) Reserve pit MUD SYSTEMS: Visual Trip tank '-' Pit gauge Flow monitor Gas detect°~s ' ~ '~ l BOPE STACK: AnnUl ar preventer Pi pe rams B1 ind rams Choke line valves HCR valve Kill line valves Check val ye STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMMISSION BOPE Inspection Report Wel 1 sign ~ Rig ~ Audio Test Pressure :Po o '/ $-'~ o o ~'"oo /',~"~o 0 _B~o / ~o 0 DATE TEST :. i ni ti al J'"'Weekl y,~ Other Representative/l~Ot '~ ~[~.~. ~'~ Permit# 90 -- /~~. Casing set ~ ~*¢'~ ,t AOCUMU~TOR SYST~: Full c~acge pressore ~~ ~ psig Press after closure [~G psig Pump incr clos press 200 p~ig min ~ sec Full charge press attained ~ min ~ sec Control s: Master Remote ~ B1 ind switch cover KELLY AND FLOOR SAFETY VALVES: Upper Kelly Lower Kelly Test pressure Test pressure Test pressure Ball type Inside BOP Choke manifold Number valves Number flanges Adjustable chokes Hydraulically operated choke TEST RESULTS: Failure, / Test time y/y hfs Repair or replacement of failed equipment to be made within the Inspector, and follow with written/FA×ed verification to Commission office. Distribution: orig - AOG£C c - Operator c - Supervisor C.004 (rev 05/10/90) July 2, 1990 Telecopy~ (907)276-7542 George W. Kirton PBU Lead Engineer BP Exploration (Alaska) Inc. P.O. Box 196612 Anchorage, Alaska 99519-6612 Prudhoe Bay Unit Z-05 BP Exploration (Alaska) Inc. Permit No. 90-78 Sur. Loc. 975'SNL, 3930'WEL, Sec. 19, TllN, R12E, UM Btmhole Loc. 4305'SNI,, 1816'WEL, Sec. 13, TllN, RllE, TJM Dear Mr. Klrton: Enclosed is the approved application for permit to drill the above referenced well. The permit to drill does not exempt you from obtaining additional permits required by law from other governmental agencies, and does not authorize conducting drilling operations until all, other required permitting determinations are made. The Commission will advise you of those BOPE tests that it wishes to witness. Very truly yours, Chai~n of Alaska Oil and Gas Conservation Co~ission BY O~ER OF THE COMMISSION dlf Enclosure Department of Fish & Game, Habitat Section w/o encl. Department of Environmental Conservation w/o encl. STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMMISSION PERMIT TO DRILL 20 AAC 25.005 la. Type of work Drill [] Redrilll-lllb. Type of well. Exploratoryr-I Stratigraphic Testl-I Development OilE] Re-Entry [] DeepenI-II Service [] Development Gas [] Single Zone [] Multiple Zone [] 2. Name of Operator 5. Datum Elevation (DF or KB) 10. Field and Pool BP Exoloration KBE = 92' feet Prudhoe Bay Field/Prudhoe 3. Address 6. Property Designation Bay Pool P. O. Box 196612. Anchoraae. Alaska 99519-6612 ADI 292~5 4. Location of well at surf-ace 7. Unit or property Name 11. Type Bond(sca 2o AAC 25.025) ~ 975'SNL,~ ~1/~, SEC. 19, T11N, R12E Prudhoe Bay Unit At top of productive interval 8. Well number Number 4380' SNL, 1694' WEL, SEC. 13, T11N, R 11E Z-05 (34 - 13-11 - 11) 2S 100302630-2 77 At total depth 9. Approximate spud date Amount 4305' SNL, 1816' WEL, SEC. 13, T11N, R11E July 7, 1990 $200,000.00 12. Distance to nearest 13. Distance to nearest well 4. Number of acres in property 15. Proposed depth(UDandTVD) property line ADL 28262 @ 1816' feet Z-06 @ 2800'/34' feet 2560 10283'MD/9178'TVDfeet 16. To be completed for deviated wells i17. Anticipated pressure (see 20 ^^c 25.035 (e)(2)) Kickoff depth 3000feet Maximum hole angle34.25 o Maximum surface 3330 psig At total depth (TVD) 8800'/,~390 pslg 18. Casing program Setting Depth s~ze Specifications Top Bottom Quantity of cement Hole Casing Weight Grade Coupling Length MD TVD MD TVD (include stage data) 20" Cond. 80' Surface 110' 110' 13-1/2" 10-3/4" 45.5~ L-80 Butt 2650' Surface 2680' 2680' 1949 cu ft Permafrost 9-7/8" 7-5/8" 29.7# L-80 NSCC 9604' Surface 9634' 8641' 1214 cu ft Class G 6-3/4" 5-1/2" 17# L-80 NSCC 899' 9384' 8434' 10283' 9178' 181 cu ft Class G 19. To be completed for Redrill, Re-entry, and Deepen Operations. Present well condition summary Total depth: measured feet Plugs (measured) true vertical feet Effective depth: measured feet Junk (measured) true vertical feet Casing Length Size Cemented Measured depth True Vertical depth Structural Conductor ~ ~(~ E IVE I~? Surface Intermediate Production· 2 8 ]99¢ Liner ~!~!~k~ 0ii & Gas Cons. C0mrr~issi0[~ Perforation depth: measured true vertical .... '~,~k ~rJchorag~ 20. Attachments Filing fee [] Property plat [] BOP Sketch [] Diverter Sketch [] Drilling program [] ~Drilling fluid program [] Time vs depth pict [] Refraction analysis [] Seabed report[] 20 AAC 25.050 requirements[] 21. I hereby certify that the foregoing is true and correct to the best of my knowledge ,f~ &,{,' ~ '~; ~:~, ~, Ti tie PBU Lead Engineer Commission Use Only Permit Number IAPI number IApproval date2 ISee cover letter /q'~2-~n¢ 150-o~¢- ~_ ~o..5-~'" I 07/0 /90 Ifor other requirements Conditions of approval Samples required [] Yes /'~r_ ~ Mud Icg required [] Hydrogen sulfide measures [] Yes ~' No Direction,~l. survey required '~'Yes [] No Required working,.Pl-essu~ f~edl~P~_.3 FI2_,M;p3M; J~5M; F'IIOM; F'I15M; Other:____~y//. ~(///~~ ........... by order of ,_Approved b Commissioner ,ne commission Dar Form 10-401 Submit )licate AFE No. PROPOSED DRILLING AND COMPLETION PROGRAM WELL Z-05 [34-13-11-111 PBU Install and cement 80' of 20" conductor to surface. Install 20" diverter. The Drilling fluid program will consist of an 9.5-10.0 ppg spud mud in the 13- 1/2" hole, a 9.5-10.4 ppg water base mud in the 9-7/8" hole and a 9.5 ppg water base mud in the 8-1/2" hole. Drill 13-1/2" hole to 2700' MD and cement 10-3/4" 45# L-80 Buttress casing to surface. Install blowout prevention equipment consisting of 5000 psi W.P. pipe rams, blind rams, and annular preventer. Maximum possible bottomhole pressure is 4390 psi at 8800' TVDss based on original reservoir pressure. Maximum possible surface pressure is 3330 psi based on a gas column to surface from 8600' TVDss and an oil column to 8800' TVDss. Directional drill 9-7/8" hole to the 7-5/8" casing point above the Sadlerochit Sandstone. Run 7-5/8" 29.7# L-80 NSCC casing to within 10' of 9-7/8" TD and cement with Class G cement around the 7-5/8" shoe. The annulus will be freeze protected by dry crude. Directional drill 6-3/4" hole to TD. Run 5-1/2" liner from TD to 250' inside 7-5/8" casing shoe and cement using Class G cement. Clean out to 5-1/2" float equipment. Test casing and lap to 3000 psi. Change over to NaCL completion fluid. Run 7-5/8" production packer on tubing. Set packer 50' above top of liner. A subsurface safety valve with dual control lines will be placed 100' below base of permafrost. Install and test Xmas tree. Displace tubing to diesel. Set and test packer. The well will be perforated with rig on location. Fluids incidental to the drilling of a well will be pumped down the 7-5/8" x 10- 3/4" annulus of the well. Tubing Size: 3-1/2", 9.3# L-80, TDS R-2 TBG with 6 GLM's. Tailpipe Size: 3-1/2" TAILPIPE sal: 6/25/90 PRELIMINARY WELL PLAN Well: Z-05 [34-13-11-11] PBU AFE NUMBER: LOCATION: Surface: Target: T.D.: 975' SNL, 3930' WEL, Sec. 19, TI IN, R12E 4380' SNL, 1694' WEL, Sec. 13, Tl lN, RI 1E 4305' SNL, 1816' WEL, Sec. 13, TllN, RllE ESTIMATED START: July,1990 OPR. DAYS TO COMPLETE: 23 CONTRACTOR: Alaska United #2 MAX ANGLE/SECT COURSE/KOP/13UILD RATE: 34.25/N58.4W/3000/2.5 Item TVDss MD(BKB) Mud Wt. 20" CONDUCTOR 110 9.5 10-3/4" SHOE 2588 2680 10.0 BASE WEST SAK FORMATION 4910 5231 9.5 KUPARUK 6465 7113 10.4 IKRU-PB U 6580 7251 10.4 7-5/8" SHOE 8549 9634 10.4 TOP SAG RIVER SANDSTONE 8557 9643 10.4 TOP SADLEROCHIT 8732 9855 9.5 TARGET 8874 10026 9.5 TOTAL DEPTH 9085 10283 9.5 LOGGING PROGRAM: Open Hole - Record all logs on magnetic tape where applicable. 9-7/8" Hole: None. 6-3/4" Hole: DIL/BHCS/CNL-GR RFT, (OPTIONAL LDT and sidewall cores) Cased Hole CBT/CET and Gyro. Perforate before rig release. sah 6/25/90 ?::~i~ka ~Oii .& Gas Cons° Commissi0r~ PROPOSED DOWNHOLE DIAGRAM WELL Z-05 [34-13-11-11] PBU PROPOSED DEPTH BKB 20" Conductor 110 Ball Valve 2100 10-3/4" Casing Shoe 13-1/2" Open Hole 2680 2700 Calculated cement top 3375'-- 3-1/2" 9.3# L-80 TDS R-2 IPC Tubing with 6 GLM's £ . 7-5/8" Packer 9334 5-1/2" Tieback Assembly 9384 7-5/8" Shoe 9634 9-7/8" Open Hole 9644 5-1/2" 17# L-80 NSCC Liner 5-1/2" PBTD 10243 5-1/2" Liner Shoe 10283 6-3/4" Open Hole 10283 SAL:3/28/90 BOP STACK CONFIGURATION 13 5/8", 5000 PSI WP TRIPLE RAM STACK DRILLING RISER ANNULAR PREVENTER 2" KILL LINE MANUAL HYDRAULIC GATE GATE I PI PE RAMS I 1 BLIND RAMS I DRILLING SPOOL I I P! PE RAMS ! 4" CHOKE LINE HYDRAULIC MANUAL GATE GATE SURFACE HOLE DIVERTER SYSTEM Two lines venting 90 deg. apart in directions that ensure safe down wind venting, and ex- tending to a point at least 100' from any potential source of ignition. 43' 10" Full Opening Valves 35' or as required Dresser Sleeve 10" Diverter Line NOTES 1. All pipe connections 150# ANSI Flanges or welded connections and secured to prevent movement. ~,fl ~.,r',,' ,~,~ 2. Manual 10" ~valve~f mechanically connected to ensure that one valve is fail-safe open .at all times. 3. All turns are 90 deg. and targeted. 10" Full opening ball valve w/Hydraulic Actuator Cellar 20" Diverter Spool w/10" Side Outlet JWB 2/2O/89 NORTH WELL N* Z- ,5 SURFACE LOCATION LAT. · 70° 17 ' 51. 732" LONG, · 149° I1' 51. 451 "' Y · 5, 959, 100.02 A.~.P. X · 599, 081.11 ZONE 4 975 ' FROM N. LINE SECT. 19 357' FROM 11. LINE SECT. I9 T. It T. IJ T II T. I0 .& Oons, Commi$ io CERTIFICATE OF SURVEYOR: _ I NEREBY CERTIFY THAT I&M I~ROPERLY REGISTERED AND LICENSED TO PRACTICE LAND SURVEYIN6 DJ THE STATE OF ALASKA AND THAT THIS PLAT REPRESENTS A LOCATIC~N SURVEY M&~ BY ME OR UN~ MY ~I~ON, MD ~T ALL WEN$1ONS AND OTHER DET&ILS A,~ CORRECT. SURVEYOR DATE: ~ Bernard Tomulich L.$. ~798 ~. OF/- $SION ~kL SHEET I*OF 2 WELL PAD 'Z I'ELL N° Z-5 AS-BUILT lOCATE D IN PROTRACTED ~ECT. 19 , T. II N. , R. 12 E., U, M. SURVEYED FOR : ~T~I~ ALASKA. P'~ODUCTIOt"~ CO. PREPARED IY : KUUKPIK - TECHNICAL SERV, INC. PR UDHOE lAY OFFICE DATE : NOV. 20,86 DRAWN BY: IT. CHKD. BY; R.H. NW CORN. OF SECT. 19 SUM P 1357' NORTH LINE OF SECTION 19 · · · · · · SUMP NORTH SHEET 2 OF 2 WELL PAD 'Z' j I II IIIII WELL Ne Z-5 AS-BUILT m, LOCATED IN S~C*T: 19 , T. II ts. , R. If' F.., ILM. SURYEYED POR : STANDARD ~ASy,~ ~TJOq CO. PIq~PAIIED BY z DATE: KUUKPIK - TECHNICAL SERV. INC. DIqAWN PRUDHOE BAY OFFICE CHK~. BY; R.N. -~4~p,~:A,'n4- rDRANSRC ~TEST. RUN'Z05 CLOSAP SHORT7. i iS¢ I --- Closest An~.~ ch Anal si .... .. ~ ~_, _o a__j .'_ ._ a___g ~ Date' ~O-MAR-90 Time: 1&:08- 17 Search Radius= 200 7 DEGREE LEAD LINE For proposed well' Z-05 [34-13-11-11] 20-HAR-i990 l&: Page Location = W-E S-N TVD(SBS) Top 599081.00 5959100.00 -92.00 Bottom 595521.93 5960671.71 9329.00 · Note: All depths in ~eet Belo~ Kellg Bushing (BKB) Closest Approach NELL IDENT /PROPOSED\ /NEARBY\ CLOSEST TVD DEPART TVD DEPART DISTANCE A - Vertical Intersection /PROPOSED% /NEARBy\ TVD DEPART TVD DEPART DISTANCE Z-I2 ( A029-2178700 Z-8 NO COORDINATE POINTS WITHIN SPECIFIED SEARCH WINDOW 0.4 0.0 0.0 0.0 105.0 5758.5 1397.3 4537.0 1301.9 -1221. 1 AO=9 =17~,01 Z-8org A029-2179800 O. 4 O. 0 O. 0 O. 0 105. 0 5358.5 1124.9 4770.8 1029.8 -587. 3 ::: Z-6 :':: A029-2181400 .~, Z-A ~i A029-2183000 ~. Z-1 .0, A029-2187100 A029-2187900 Z-28 A02~-218~500 Z-33 A029-2189501 2800.1 0.0 2800.0 0,9 34~4 3031.8 0.7 3033.7 . '..'!8.5% 103:'4 800.3 0.0 800.0 1.0 139.2 700.6 0.0 700.0 1.0 28~,6 2900.4 0.0 2~00.0 '..8.'7i::~',: , ; 255.:5 4012.3 236.3 4014.3 22. 5 158.3 v. Z-33A )2~-2192400 - Z-32 ,~: A029-2193800 ,: Z-21 .:~: A029-2195400 3798.6 144.0 3803. 5 120.3 12271 2800.2 0.0 2800.0 ;7.7:._ 273.9 1092.0 0.0 1035.0 147. 1 511.5 3531.8 &3. 1 5363.8 249.2 1832.4 A029-2196700 z--o9 2000.2 0.0 2000.0 3.7 257.4 1198,4 0.0 1200.0 3.8 136.2 .:. A029-2197700 -, Z-12 :~, A029-2198600 ND COORDINATE POINTS WITHIN SPECIFIED SEARCH WINDOW · Z-lC 192.0 0.0 191.8 0.0 175.0 ;, A029-2199000 Z-04 0.0 0.0 2.1 0.0 35.0 5036.3 905.6 2i68.0 748.8 -2868. ! .'SUMMARY A029-2179800 Z-6 $45DUA124' [DRANSRC. QTEST RUN]ZOS_CLOSAP_SHORT. LIS; 1 -- 20-MAP,- 1990 ! 5' 2 --- Cioses~ App=oach Analysis --- Date- 20-MAR-90 Time: 15'21'00 Search Radius= 200 COURSE LINE For proposed ~ell' Z-05 [34-13-11-11] Location = W-E S-N TVD(SBS) Top 599081.00 595C;100.00 -92.00 Bottom 595740.00 5C;610C;3.73 C;32C;.00 Note: All depths in ~eet Below Kellg Bushing (BKB) J WELL IDENT Closest Approach .... ""i'':"i 'i /PROPOSED\ /NEARBY\'~:~f.li!::':f:i:':: CLOSEST Vertical Intersection /PROPOSED\ /NEARBY\ VERTICAL :9 TVD DEPART TVD DEPART DISTANCE TVD · s. Z-12 -_: A029-2178700 :' Z-8 A029-2178701 Z-8org A029-2179800 __ ' .'2' A0~9-2181400 ~' A02c;-2183000 ~'~! Z- ! ~0 A02C;-2187100 ~ Z-31 i~ ,~t A02c2-2187900 ~ Z-28 -33 A02c;-2189501'Z -33A ~02c2-21 ~2400 -32 :oi A029-2193800 - Z-~l -~ A029-2195400 A029-2i C;6700 Z-09 NO COORDINATE POINTS WITHIN SPECIFIED SEARCH WINDOW o. o o. o lOS. O 0.4 0.0 0.0 0.0' 105.0 2800.1 ::.i3035.5 800.3 O. 0 2800. 0 0.8 O. 0 800. 0 700.~ 0.0 700.0 2900.4 ,r , O.0 ,, 2~00.0 4044.7 252.3 4046.1 3817. C; 151.5 2800,2 0.0 2800.0 34. 4 1. 0 139.~ 23.0 128.4 10C;P. o O. 0 lO35. o 147. I 5111 ,.5 2000.2 o. o 2000. o .: .~.'~::~..;~:3.-':71:ii. ii~.:.-;~ L'~7,.~,.:~.~:C..: .i.;: I lc;~. 4 O. 0 1200. 0 '4' 3.:8 ',,:": 13__&.i 2 .... A029-2197700 .... A029-2198600 NO COORDINATE POINTS WITHIN SPECIFIED SEARCH WINDOW DEPART TVD DEPART DISTANCE 64.1 5329.8 ~43.~ 1794.~ ~- 0 ~s C5 ,4; j44 ~8 .55 571 5~ Z-lO A029-2199000 Z-04 SUMMARY lc;2. 0 O. 0 191. 8 O. 0 17.5. 0 0.0 0.0 2.1 0.0 3..__5.0 A029-217C;800 Z-6 MUD WEIGHT CALCULATIONS WF~LL Z-05 (34-13-11-11) (~ement Calculations 10-3/4" CASING Measured Depth: Basis: Total Cement Vol: 7-5/8"CASING Measured Depth: Basis: Total Cement Vol: Lead Slurry Vol: Tail Slurry Vol: 5-1/2" LINER Measured Depth: Basis: Total Cement Vol: 2680' 2 X Annular volume 1949 (cu ft) 9634' 90% Annular Volume to 10-3/4" + 36 cu ft 1214 (cuft) 1064 (cuft) 150 (cu ft) 10283' (Shoe) 1.5 X Annular volume to 7-5/8" shoe + 100 cuft 181 (cuft) sal: 6/25/90 /1UD 18.I &6~ ro /"IUD rPk~ ~ rot D · ~I I G) ' H c:~ ro i - B~andt Dual Tancle~m Shale Shake~ 1 - Demco 6-12" Cone Shale Desander 1- Demco 416H w/16 cones & (1) Demco 48H w/16 cones (Desilter) 1 - Drilco Atmospheric Mud Degasser 1- 200 gpm Operating Capacity. Centrifuge 15 - Brandt MA5 Mud Mix Agitators 1 - 150 bbl. Trip Tank 1 - P~cording drilling fluid pit level indicator with both visual and audio warning devices at driller's console D£1~¢ o IZ 3 ~D TI~A~ r~D£~ FI 1' I r~U~ I 1 - Drilling fluid flow s~or with readout at drili%~!,s console CHECK LIST FOR NEW WELL PERMITS ITEM APPROVE DATE 1. hru 8) (8) (3) Admin.~. ~_ ~ 9. ' (9 thru'13)' ' 10. (10 and 13) 12. 13. (14 thru 22) (23 thru 28) ? - / ' YES NO ~tEMARKS ~ " Is the permit fee attached .......................................... . ........ 2. Is well to' be located in a defined pool ............................. ~ 3. Is well located proper distance from property line .................. ~__ ---- 4 Is well located proper distance from other wells .................... 5 Is sufficient undedicated acreage available in this pool ............ . ...... 6 Is well to be deviated and is wellbore plat included ................ . ..... 7. Is operator the only affected party ................................. 2~- . .. 8. Can permit be approved before fifteen-day wait ...................... . Does operator have a bond in force .................................. . . Is a conservation order needed ...................................... ~-- Is administrative approval needed ................................... Is the lease number appropriate ..................................... Z Does the well have a unique name and number ......................... 14. 15. 16. 17. 18. 19. 20. 21. 22. 23. 24. 25. 26. 27. 28. Is conductor string provided ........................................ Will surface casing protect all zones reasonably expected to serve as an underground source of drinking water ..................... Is enough cement used to circulate on conductor and surface ......... Will cement tie in surface and intermediate or production strings ... Will cement cover ail known productive horizons ..................... Will all casing give adequate safety in collapse, tension and burst.. Is this well to be kicked off from an existing wellbore ............. Is old wellbore abandonment procedure included on 10-403 ............ Is adequate wellbore separation proposed ............................ Is a diverter system required ....................................... Is the drilling fluid program schematic and list of equipment adequate~F_ Are necessary diagrams and descriptions of diverter and BOPE attached. Does BOPE have sufficient pressure rating - Test to ~-OO~ psig .. Does the choke manifold comply w/AMI RP-53 (May 84) .................. Is the presence of H2S gas probable ................................. (6) OTHER Ao/.</ ~ '(~.9 th (6) ~ Geotog~: DWJ ~ En g '.z~.~ ~r in g: LcS -~/('g BEW~~_' rev: 01/30/89 6.011 · For 29. 30. 31. 32. exploratory and Stratigraphic wells: Are data presented on potential overpressure zones? ................. Are seismic analysis data presented on shallow gas zones ............ If an offshore loc., are survey results of seabed conditions presented Additional requirements ............................................. ~ Additional Remarks: ..... INITIAL GEO. UNIT ON/OFF POOL CLASS STATUS AREA NO. SHORE , Well History File APPENDIX Information of detailed nature that is not particularly germane to the Well Permitting Process but is part of the history file. To improve the readability of the Well History file and to simplify finding information, information, of this nature is accumulated at the end of the file under APPENDIX. No special'effort has been made to chronologically organize this category of information. ,o PROGRAM: LIS REVISION: 4.1 PART NUMBER: W5550-MICRO Start of. execution: Fri 27 JLY 90 2:12pm ECC: COMPANY NAME: WELL NAME: FIELD: LOCATION: Top of Well: Bottom of Well: Level Spacing: 4489.00 BP EXPLORATION (ALASKA), Z - 5 (34-13-11-11) 9590.000 10320.000 0.500 NUMBER OF CURVES: 19 DEPTH AC ACQ CHT CILD CSSN GR RFOC RILD RILM TTEN VILD VILM CLSN SP CN SPD CNC TEMP COMPANY:BP EXPLORATION (,ALASKA), WELL:Z - 5 (34-13-11-11) FIELD:PRUDHOE BAY COUNTY:NORTH SLOPE STATE:ALASKA TAPE INFORMATION FILE: MAIN .001 FILE INTERVAL: START= 10320.000 END= 9590.000 DEPT GR CN CNC 10320.000 10295.000 RILD RILM CILD SP -999.250 -999.250 -999.250 -999.250 -999.250 -999.250 -999.250 CSSN AC -999.250 -999.250 CLSN CHT -999.250 -999.250 0.000 0.000 0.000 80.000 70.000 0.200 2.270 0.000 50.000 873.177 TTEN TEMP -999.250 -999.250 4828.473 100.000 RFOC SPD -999.250 -999.250 3.880 23.998 -J. UZ-/ U o UU(J O.UUU 1.563 -60.798 0.000 1.662 0.000 639.801 80.000 90.159 70.000 1034.094 5012.078 100.000 2. ~-/~ 24.997 10245.000 37.907 1.966 -56.307 17.760 2.000 22.755 508.771 263.313 86.236 150.322 998.509 4956.656 100.000 3.068 24.997 10220.000 26.113 1.797 -52.756 17.731 1.797 22.724 556.468 254.669 88.467 147.483 995.255 4962.625 188.101 3.110 24.997 10195.000 23.296 2.406 -47.779 15.131 2.503 20.046 415.610 281.746 79.963 175.282 1001.634 4996.988 188.895 4.550 24.997 10170.000 26.915 5.942 -37.933 8.718 5.964 13.218 168.280 334.932 73.550 259.067 1054.237 5014.332 189.865 11.533 24.997 10145.000 27.664 6.731 -37.991 12.181 6.456 17.002 148.575 302.203 78.168 208.997 1043.333 4922.098 190.840 6.901 24.997 10120.000 24.131 7.996 -24.787 11.334 7.759 16.136 125.060 318.128 74.470 228.515 1012.488 4827.230 191.590 21.474 24.997 10095.000 45.397 6.584 -28.227 13.210. 6.190 18.066 151.882 303.334 76.417 200.224 1000.408 4785.875 192.123 10.638 24.997 10070.000 10045.000 36.997 8.458 -29.530 55.521 10.862 -11.547 13.190 7.357 17.863 10.712 18.046 118.234 22.859 92.064 304.439 78.891 '274.081 78.954 197.089 1010.494 150.729 988.779 4833.285 192.355 4773.648 192.375 11.885 24.997 12.473 24.997 10020.000 57.603 10.310 -13.495 14.082 9.280 18.965 96.993 317.199 72.758 202.590 1022.220 4831.477 192.296 13.895 24.997 9995.000 32.532 11.589 -34.273 14.686 9.371 19.587 86.288 276.745 85.462 176.331 999.968 4723.516 192.~082 11.526 24.997 9970.000 25.762 15.902 -34.689 14.740 12.341 19.643 62.886 285.074 82.248 184.194 1009.394 4776.277 191.801 17.009 24.997 9945.000 26.199 21.445 -33.693 15.964 15.445 20.904 46.630 276.780 84.736 168.864 1002.590 4818.578 191.528 18.469 24.997 9920.000 29.489 22.919 -41.109 17.181 16.184 22.158 43.632 261.598 86.056 154.880 1008.591 4784.215 191.158 18.450 24.997 9895.0O0 30.953 15.148 -43.999 10.657 13.432 15.402 66.016 309.082 87.110 220.134 1055.883 4850.129 190.740 16.396 24.997 -9845;000 287.856 9.763 14.396 24.117 21.314 41.464 -25.186 293.896 75.555 220.577 1031.165 4789.629 189.328 20.429 24.997 9820.000 68.807 1.147 4.102 63.527 35.179 15.741 12.720 514.198 56.056 667.912 1045.822 4846.457 188.560 803.931 24.997 9795.000 321.482 14.568 19.466 14.891 14.050 67.154 11.355 302.828 66.999 189.552 1102.641 4975.906 187.730 8.365 24.997 9770.000 107.572 8.778 13.286 7.234 6.505 138.227 17.510 298.318 74.190 235.057 1054.851 4906.594 186.837 16.287 24.997 9745.000 126.971 24.111 29.157 13.060 12.605 76.572 10.321 247.833 90.880 118.494 1009.509 4794.629 185.856 21.443 24.997 9720.000 41.096 1.160 4.120 43.769 34.571 22.847 -30.517 560.761 53.445 723.364 988.322 4796.043 184.932 147.044 24.99.7 Z - 5 DEPT (34-13-11-11) GR CN CNC CSSN CLSN TTEN RFOC RILD RILM CILD AC CHT TEMP SPD SP 9695.000 104.436 13.392 18.254 10.153 9.238. 98.498 -46.701 278.316 82.683 187.271 968.510 4700.750 184.033 10.147 25.997 9670.000 81.623 54.164 58.180 24.263 10000.000 41.215 19.385 138.096 118.741 44.616 968.624 4691.953 183.244 0.212 25,997 9645.000 82.163 56.645 60.548 0.200 0.200 0.000 -80.000 132.000 151.067 40.949 300.000 3500.000 182.492 0.200 0.000 9620.000 75.375 58.356 62.177 0.200 0.200 0.000 -80.000 127.187 50.000 41.032 300.000 3500.000 181.724 0.200 0.000 9595.000 0.000 0.000 0.000 0.200 0.200 0.000 -80.000 80.000 5O.OOO 70.000 30O.000 3500.000 180.992 0.200 0.000 9590.000 -999.250 -999.250 -999.250 -999.250 -999.250 -999.250 -999.250 WELL DATA FILE: C : \WDSDATA\W04490.WDF -999.250 -999.250 -999.250 -999.250 -999.250 -999.250 -999.250 -999.250 ECC: 4490.00 COMPANY NAME: BP EXPLORATION (ALASKA), wq~.T.T, tCAMV.- Z - 5 ~3z~-13-11-tl ~ Top of Well: Bottom of Well: Level Spacing: 9580.000 10320.000 0.500 NUMBER OF CURVES: 19 DEPTH AC ACQ CSSN GR RFOC TTEN VILD VILM CHT CILD CLSN CN RILD RILM SP SPD CNC TEMP FILE:REPEAT.001 FILE INTERVAL: START= 10320.000 END= 9580.000 DEPT GR CN CNC 10320.000 10295.0O0 10270.000 10245.000 10220.000 10195.000 10170.000 10145.000 10120.000 RILD SP -999.250 -999.250 -999.250 0.000 0.200 -67.692 0.000 1.606 -71.671 0.000 1.980 -71.851 40.368 1.809 -72.889 22.24'7 2.431 -70.504 27.433 6.129 -63.443 27.884 6.755 -64.021 21.016 8.659 -56.256 RILM -999.250 -999.250 0.000 2.202 0.000 1.697 17.268 2.014. 19.261 1.796 14.724 2.505 8.590 6.006 11.540 6.347 10.585 8.124 CILD -999.250 -999.250 0.000 0.000 0.000 622.835 22.249 504.951 24.304 552.866 19.626 411.417 13.075 163.165 16.347 148.048 15.320 115.480 CSSN AC -999.250 -999.250 80.000 50.000 80.000 90.616 267.241 85.676 245.996 88.438 282.089 80.336 339.673 73.290 313.271 78.219 319.447 72.228 CLSN CHT -999.250 -999.250 70.000 912.570 70.000 1102.301 150.892 1089.137 140.445 1052.366 175.399 1063.553 268.443 1063.169 215.216 1064.735 233.578 989.042 TTEN TEMP -999.250 -999.250 4876.812 100.000 5136.074 100.000. 5039.695 100.000 4913.496 194.207 4942.199 194.963 4922.391 195.738 4915.215 196.365 4747.539 196.827 RFOC SPD -999.250 -999.250 3.546 23.871 3.011 24.997 3' 183 24.997 3.185 24.997 4.650 24.997 10.992 24.997 6.931 24.997 20.731 24.997 10095.000 41.492 13.626 18.495 300.767 196.712 4729.937 10.381 10070.000 10045.000 10020.000 9995.000 31.589 8.684 -55.786 65.804 10.133 -30.251 58.767 9.747 -34.045 32.376 11.919 -63.368 14.025 7.503 19.017 9.670 15.375 8.986 15.845 9.599 18.906 115.152 24.053 98.689 20.297 102.595 20.782 83.898 299.109 80.437 262.217 79.687 302.643 72.704 278.342 83.904 196.329 989.744 137.217 969.626 186.011 968.827 164.077 935.677 4751.469 197.177 4722.582 197.112 4732.652 196.855 4685.109 196.539 12.208 24.997 8.463 24.997 13.637 24.997 11.684 24.997 9970.000 23.602 15.786 -65.286 15.453 12.547 20.378 63.349 289.155 81.158 175.793 945.859 4685.539 196.088 16.697 25.997 9945.000 24.184 2.1.975 -64.806 16.296 15.423 21.246 45.507 273.998 84.836 167.710 960.869 4740.016 195.698 18.100 25.997 9920.000 28.339 23.796 -63.586 18.300 16.140 23.313 42.023 264.972 86.297 148.381 995.488 4773.316 195.213 18.190 25.997 9895.000 31.061 16.429 -63.079 10.920 14.196 15.698 60.866 309.529 86.664 222.217 975.547 4789.402 194.771 16.669 14.999 9870.000 41.855 10.692 -39.974 7.065 9.695 11.361 93.526 365.000 75.187 311.287 988.788 4838.637 194.273 13.227 21.234 9845.000 194.400 23.140 -44.265 6.388 17.661 10.602 43.216 360.005 69.315 323.572 976.969 4818.633 193.764 79.670 25.762 9820.000 69.531 60.307 -14.397 1.086 34.814 4.024 16.582 532.266 55.710 679.959 999.887 4873.859 192.706 94.177 25.888 9795.000 303.396 19.290 -11.444 12.029 30.672 16.850 51.841 338.613 64.215 226.377 1007.333 4914.508 191.651 24.177 24.997 9770.000 123.461 5.410 -9.217 13.864 4.323 18.740 184.849 273.001 80.283 178.621 927.859 4801.078 190.811 10.220 24.997 9745.000 129.409 14.019 -14.189 23.556 12.869 28.609 71.332 233.276 90.389 117.857 996.329 4802.746 189.998 22.390 24.997 9720.000 47.051 54.254 -54.617 1.548 41.409 4.623 18.432 538.964 56.493 682.382 937.693 4760.918 189.097 372.744 25.107 Z - 5 (34-13-11-11) ~ RILD RILM CILD AC CHT TEMP SPD SP 9695.000 97. 10. -72. 696 13.714 18.585 524 9.293 95.025 673 9670.000 78. 4. 0. 040 54.544 58.544 281 !0000.000 233.607 567 9645.000 80. 0. -80. 949 59.474 63.243 200 0.200 0.000 000 9620.000 75. 0. -80. 396 57.608 61.465 200 0.200 0.000 000 9595.000 . 0. -80. 000 0.000 0.000 200 0.200 0.000 000 9580.000 -999. -999. -999. WELL DATA FILE ECC 250 -999.250 -999.250 250 -999.250 -999.250 250 : C: \WDSDATA\W04491.WDF : 4491.00 COMPANY NAME: WELL NAME: FIELD: LOCATION: BP EXPLORATION (ALASKA) , Z - 5 (34-13-11-11) Top of Well: Bottom of Well: Level Spacing: 6940.000 9720.000 0.500 NUMBER OF CURVES: 19 DEPTH AC ACQ CSSN GR RFOC TTEN VILD VILM CHT RILD CILD RILM 285.676 83.585 135.869 154.897 133.123 227.623 131.831 50.000 80.000 50.000 -999.250 -999.250 CLSN SP 189.469 923.160 44.321 940.180 45.798 300.000 43.905 300.000 70.000 3OO.OOO -999.250 -999.250 CN SPD 4689.172 188.369 4644.172 187.640 3500.000 186.780 3500.000 185.875 3500.000 184.980 -999.250 -999.250 CNC TEMP 9.849 25.997 0.221 25.997 0.200 0.000 0.200 0.000 0.200 0.000 -999.250 -999.250 FILE:C.H.CN.003 FILE INTERVAL: START= 9720.000 DEPT GR CN CNC TEMP -999.250 -999.250 SPD -999.250 -999.250 9720.000 -999.250 END= CSSN -999.250 6940.000 CLSN -999.250 TTEN -999.250 CHT -999.250 '9670~000 9645.000 9620.000 9595.000 9570.000 9545.000 9520.000 9495.000 9470.000 9445.000 9420.000 9395.000 9370.000 9345.000 9320.000 9295.000 9270.000 9245.000 9220.000 9195.000 9170.000 0.000 100.000 77.604 100.000 81.940 178.177 99.647 178.543 88.348 178.847 95.344 179.110 82.146 179.292 81.412 179.364 81.205 179.286 94.098 179.229 86.519 179.068 81.511 178.782 68. I95 178.419 66.104 177.983 72.020 177.535 50.911 177.144 73.911 176.567 72.549 176.073 74.001 175.556 69.149 175.124 70.723 174.567 0.000 38.996 58.371 39.396 58.394 38.996 60.005 38.996 56.601 38.996 60.348 38.996 49.902 38.996 56.441 38.996 61.847 38.996 68.342 38.996 60.027 38.996 54.810 38.996 49.810 38.996 44.408 38.996 46.167 38.996 30.989 38.996 45.919 38.996 39.894 38.996 46.317 38.996 41.426 38.996 46.510 38.996 0.000 51.235 51.328 52.788 49.809 53.052 44.061 49.512 54.276 60.139 52.655 48.308 43.956 39.534 40.942 28.174 40.930 35.500 41.238 36.670 41.324 65.000 133.732 130.520 134.015 136.001 140.291 140.399 144.171 129.789 134.339 141.908 139.486 150.233 158.363 155.701 191.192 151.536 161.350 149.624 150.082 149.871 95.000 44.171 43.880 41.584 45.503 44.482 51.211 47.083 42.912 39.517 46.447 45.887 52.767 58.973 57.698 79.127 51.588 62.640 54.333 58.978 51.252 4784.844 4784.664 4749.379 4727.238 4666.469 4674.465 4698.500 4637.023 4595.211 4597.855 4591.992 4593.559 4582.609 4566.352 4586.996 4600.293 4591.707 4551.430 4538.676 4514.402 4554.145 991.637 1000.340 1008.232 981.362 967.956 971.725 985.629 969.651 946.022 931.520 911.421 902.013 921.095 925.442 908.909 928.805 915.794 929.142 921.141 943.156 941.399 '9120f000 70,336 173.538 Z - 5 DEPT (34-13-11-11) GR TEMP 9095.000 73.855 173.082 9070.000 9045.000 76.315 172.672 89.184 172.093 9020.000 77.709 171.693 8995.000 75.943 171,173 8970.000 71.162 170.851 8945.000 65.285 170.339 8920.000 57.241 169.843 8895.000 63.266 169.346 8870.000 65.513 168.883 8845.000 65.619 168.499 8820.000 8795.000 56,217 168.182 56,318 167.711 8770.000 8745.000 47.851 167.402 58,688 167.077 '8720.000 52.148 166.592 8695.000 8670.000 ~50.778 166,234 50.438 165.839 59.904 38.996 CN SPD '66.776 38.996 63.152 39.996 69.643 39.996 63.755 39.996 60.478 39.996 67.484 39.996 54.532 39.996 40.274 39.996 40,478 39.996 44.076 39.996 43.572 39.996 32.913 39.996 41.113 39.996 35.357 39.996 32.898 39.996 32.407 39.996 30.'565 39.996 31.082 39.996 52.696 CNC 58.710 55.447 61.867 56.078 53.208 59.606 48.052 35.840 35.995 39.211 38.682 29.594 36.628 31.617 29.499 29.083 27,392 27.981 122.051 CSSN 123.771 133.727 133.,988 129.799 132.684 130.618 138.017 142.641 158.652 155.034 161.194 192.442 156.780 166.412 176.123 168.783 171.044 164.495 37.531 CLSN 37.542 41.608 38.039 41.224 42.206 39.763 43.011 52.770 61.633 54.527 59.963 82.385 58.977 71.304 78.312 74.226 78.196 73.538 4485.621 TTEN 4455.926 4446.777 4419.187 4439.816 4405.187 4366.816 4392.613 4378.207 4426.172 4374.191 4384.316 4336.918 4297.391 4302.551 4294.977 4281.840 4296.711 4282.738 932.616 CHT 938.829 943.087 937.627 949.664 948.710 936.981 929.538 937.257 952.831 938.675 945.963 959.486 934.621 944.540 942.622 940.521 932.501 949.622 8620.000 165.462 60.708 165.147 8595.000 78.441 164.794 8570.000 80.339 164.516 8545.000 75.353 164.135 8520.000 78.260 163.750 8495.000 69.821 163.366 - 5 DEPT (34-13-11-11) GR TEMP 8470.000 70.728 162.945 8445.000 67.444 162.554 8420. 000 72.455 162.165 39.996 45.493 39.996 60.863 39.996 60.499 39.996 61.132 39.996 60.649 39.996 63.497 39.996 CN SPD 63.546 39.996 60.390 39.996 61.446 40.996 8395.000 71.841 58.301 161.804 40.996 8370.000 72.645 56.006 161.356 40.996 8345.000 72.526 61.500 161. 141 40. 996 8320.000 71.681 61.550 160.739 40.996 8295.000 77.380 65.066 160.314 40.996 8270.000 68.828 61.597 159.909 40.996 8245.000 72.163 53.295 159.462 40.996 8220.000 68.841 48.676 158.985 40.996 8195.000 69.288 55.689 158.527 40.996 40.296 53.293 53.133 53.754 53.336 56.034 CNC 55.623 52.809 53.647 51.136 49.209 54.292 54.075 57.249 54.003 46~985 43.018 49.073 150.942 129.570 134.230 132.265 131.835 124.512 CSSN 126.706 126.930 126.135 134.265 127.753 128.853 130.128 127.729 125.606 130.488 132.788 129.029 53.384 42.903 43.751 41.594 41.862 38.876 CLSN 39.994 42.820 43.971 47.141 42.824 39.836 43.222 39.318 41.575 43.597 48.447 41.825 4223.937 4243.914 4204.078 4184.266 4239.266 4161.555 TTEN 4168.082 4156.098 4130.129 4127.426 4123.355 4103.156 4091.108 4079.499 4055.169 4073.814 4041.858 4012.216 936.458 948.775 935.039 934.404 968.340 940.355 CHT 971.481 939.432 924.064 942.163 943'.984 928.690 901.622 921.388 919.833 928.324 928.750 911.435 8170.000 75.887 58.183 51.073 120.005 41.719 4027.906 936.144 8t45.000 ,. 68.520 157.406 8120.000 64.443 156.825 8095.000 66.115 156.258 8070.000 62.195 155.637 8045.000 64.925 155.005 8020.000 63.036 154.448 7995.000 64.667 153.793 7970.000 52.920 153.147 7945.000 70.049 152.655 7920.000 72.507 152.034 7895.000 61.720 151.571 7870.000 73.505 151.058 Z - 5 DEPT (34-13-11-11) GR TEMP 7845.000 67.252 150.563 7820.000 73.131 150.204 7795.000 7770.000 67.530 149.717 74.494 149.311 7745.000 7720.000 7695.000 7670.000 73.552 148.889 69.271 148.509 50.657 40.996 57.098 40.996 58.962 40.996 50.402 40.996 56.812 40.996 50.506 40.996 53.559 40.996 36.267 40.996 59.111 4.0.996 62.789 40.996 62.059 40.996 63.476 40.996 CN SPD 62.284 40.996 62.273 40.996 56.395 40.996 63.343 41.002 71.157 41.996 68.638 41.990 44.461 50.224 51.813 44.488 49.916 44.567 47.013 32.304 51.720 55.19'5 54.727 55.820 CNC 54.766 54.611 49.703 55.531 62.599 60.489 57.621 52.298 134.306 132.929 133.216 139.317 138.469 139.825 136.131 154.646 126.259 130.522 137.548 130.478 CSSN 130.671 125.841 137.225 121.349 131.869 133.543 136.685 134.332 49.708 44.390 42.947 45.252 48.942 47.616 47.972 67.070 41.458 39.892 39.601 38.882 CLSN 40.393 42.443 45.100 39.947 39.083 42.151 43.203 43.043 3994.666 4000.923 3990.709 3972.554 3964.319 3935.506 3904.310 3885.125 3879.296 3857.241 3858.646 3858.963 TTEN 3826.676 3820.630 3784.464 3828.117 3841.202 3785.476 3785.713 3798.406 919.185 933.964 915.802 924.494 922.795 936.316 909.364 913.966 924.403 915.552 906.769 930.103 CHT 909.082 935.681 918.175 928.313 937.731 925.771 927.728 942.379 71.737 62.630 55.055 129.288 41.415 3744.767 916.111 ~7~20.000 72.286 147.189 7595.000 73.852 146.912 7570.000 73.072 146.611 7545.000 61.924 146.210 7520.000 61.793 145.866 7495.000 64.501 145.449 7470.000 68.885 145.028 7445.000 69.624 144.673 7420.000 61.541 144.280 7395.000 69.989 143.934 7370.000 58.355 143.604 7345.000 64.446 143.242 7320.000 59.252 142.913 7295.000 58.393 142.534 7270.000 60.345 142.148 7245.000 53.405 141.831 Z -- '5 DEPT (34-13-11-11) GR TEMP ~7220.000 59.041 141.412 7195.000 41.422 141. '013 7170.000 48.889 140.630 61.801 41.596 61.976 41.996 63.923 41.996 55.515 41.996 57.328 41.996 59.982 41.996 56.511 41.996 60.628 41.996 70.798 41.996 68.019 41.996 69.097 41.996 68.169 41.996 58.007 41.996 61.438 41.996 56.986 41.996 44.577 41.996 CN SPD 43.790 41.996 37.593 41.996 46.039 41.996 54.259 54.432 55.978 48.896 50.381 52.724 49.724 53.366 62.439 59.808 61.094 59.894 50.991 53.998 49.977 39.409 CNC 38.847 33.574 40.737 128.373 129.737 124.157 138.261 137.372 132.202 133.556 129.678 125.418 127.916 133.138 121.894 133.089 120.779 131.900 138.871 CSSN 154,942 154.134 140.746 42.097 41.072 39.502 43.582 45.620 40.395 45.015 42.204 37.353 36.760 40.230 38.973 45.765 38.990 46.487 52.493 CLSN 59.000 56.741 50.584 3741.403 3723.424 3754.562 3717.683 3728.149 3707.275 3699.435 3705.596 3664.946 3681.686 3673.671 3695.239 3633.921 3654.575 3653.488 3624.944 TTEN 3618.024 3608.871 3628.295 916.907 914.890 922.771 916.777 913.635 911.814 918.359 917.299 925.790 924.573 931.456 957.347 936.361 926.282 940.818 926.812 CHT 925.288 917.313 955.239 7120.'000 78.485 76.686 67.579 121.284 32.908 3554.639 947.515 139.712 41.996 7095.000 87.115 68.209 59.954 119.388 35.181 3545.882 939.780 139.180 41.996 7070.000 124.687 69.293 60.813 119.605 37.056 3552.572 948.424 138.763 42.590 7045.000 130.423 69.139 60.351 117.951 36.416 3515.760 938.900 138.307 42.996 7020.000 134.856 85.518 75.230 113.370 31.359 3537.347 936.625 137.889 42.595 6995.000 166.806 68.071 59.654 117.803 37.476 3500.000 300.000 137.630 0.000 6970.000 130.798 77.891 68.537 116.097 32.665 3500.000 300 000 137.266 0.000 6~45.000 0.000 0.000 0.000 65.000 95.000 3500.000 300.000 100.000 0.000 6940.000 -999.250 -999.250 -999.250 -999.250 -999.250 -999.250 -999.250 -999.250 -999.250 End of execution: Fri 27 JLY 90 2:12pm Elapsed execution time = 27.03 seconds. SYSTEM RETURN CODE = 0