Alaska Logo
Department of Commerce, Community, and Economic Development
Alaska Oil and Gas Conservation
Commission
Loading...
HomeMy WebLinkAboutPBU CGF B - BP Exploration (Alaska) Inc.State of Alaska AOGCC Gas Disposition Files Year: 2015 Facility: PBU CGF B Operator: BP EXPLORATION (ALASKA) INC.     RECEIVED FEB 19 2015 STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMMISSION AOGCCo FACILITY REPORT OF PRODUCED GAS DISPOSITION 1. Facility Number 0290000008 2. Facility Name PBU CGF B 3. Field PBU - EOA 4. Operator BP 5. MonthNear of Disposition I January -201 5 Disposition Volume MCF 20. For production from multiple pools, list contribution of each pool as a percent of Total Volume. 6. Sold 1,522,207 Pool Name Pool Code Percent 7. Reinjected 5,955,241 PRUDHOE 640150 100.00% 8. Flared or vented 1 hour or less 1,130 9. Flared or vented more than 1 hour (see instr.) 0 10. Pilot and Purge 23,211 11. Assist Gas 35,683 12. Fuel gas used in lease operations. 3,058,716 13. Other (see instructions) 0 Official Use Only Authorization>1 hr: Safety MCF 14. TOTAL VOLUME (ITEMS 6-12) 10,596,188 Lease Use MCF 15. NGL Gas Equivalent 1,522,207 Conservation MCF 16. Purchased gas 0 Waste: MCF 17. Transferred from: FS1, FS2, FS3, GC1, GC2 & GC3 228,199,359 Commissioner Date 18. Transferred to: (Express as a negative #) FSI, FS2, FS3, CCP & GPMA -217,603,170 19. Remarks: Block 6: Gas equivalent of NGLs; Block 18: Includes MI Gas to Pt. McIntyre = 978,908 mscf I hereby certify that a foregoing is true and correct to the best of my knovAedge. ��/� Note: All volumes must be corrected Signature MAI Title Manager Production Taxes and Royalties Alaska to pressure of 14.65 psia and to a 41 temperature of 60o F. Authority 20 Printed Name Diane Colley Phone (907) 564-5775 Date / AAC25.235. Form 10-422 Rev. 512009 INSTRUCTIONS ON REVERSE SIDE Submit in Duplicate STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMMISSION FACILITY REPORT OF PRODUCED GAS DISPOSITION 1. Facility Number 0290000008 2. Facility Name PBU CGF B 3. Field PBU - EOA 4. Operator BP 5. Month/Year of Disposition I February -2015 Disposition Volume MCF 20. Forproduction from multiple pools, list contribution of each pool as a percent of Total Volume. 6. Sold 1,163,304 Pool Name Pool Code Percent 7. Reinjected 4,851,673 PRUDHOE 640150 100.00% 8. Flared or vented 1 hour or less 1,654 9. Flared or vented more than 1 hour (see instr.) 13,609 10. Pilot and Purge 20,661 11. Assist Gas 35,548 12. Fuel gas used in lease operations. 2,669,200 13. Other (see instructions) p Official Use Only Authorization >1 hr: Safety 13 �-o l MCF 14. TOTAL VOLUME (ITEMS 6-12) 8,755,649 Lease Use MCF 15. NGL Gas Equivalent 1,163,304 Conservation MCF 16. Purchased gas Waste: MCF 17. Transferred from: FS1, FS2, FS3, GC1, GC2 & GC3 198,787,877 Commissioner Date 18. Transferred to: (Express as a negative #) FS7, FS2, FS3, CCP & GPMA -190,032,228 19, Remarks: Block 6: Gas equivalent of NGLs; Block 18: Includes MI Gas to Pt. McIntyre = 624,226 mscf I hereby certify thGforegoing is true and correct to the best of my knowledge. Note: All volumes must be corrected Signature Title Manager Production Taxes and Ro alties Alaska to pressure of 14.65 psis and to a temperature of 60o F. Authority 20 Printed Name Diane Colley Phone (907) 564-5775 Date �.� AAC25.235. Y T L- 4 /lallS Form 10-422 Rev. 5/2009 INSTRUCTIONS ON REVERSE SIDE Submit in Duplicate BP EXPLORATION (ALASKA) INC. PRUDHOE BAY UNIT - CENTRAL GAS FACILITY GAS FLARING INCIDENT REPORT Page 3 February 2015 Unplanned Events less than or equal to 1 hour DATE TIME VOLUME DESCRIPTION OF INCIDENT & CAUSE ACTION TAKEN TO ELIMINATE CAUSE 2/1/2015 1628-1633 145 Not required for unplanned events <= 1 hr Not required for unplanned events <= 1 hr 2/4/2015 1141-1146 38 2/5/2015 0000-0005 387 2/16/2015 0211-0215 644 2/21/2015 1410-1420 387 2/25/2015 0118-0121 53 TOTAL 1,654 DAI t TIME VOLUME DESCRIPTION OF INCIDENT & CAUSE ACTION TAKEN TO ELIMINATE CAUSE 2/5/2015 0000-0230 11,207 See attachments See attachments 2/18-21/2015 0001-2359 2,402 exceeding 5,000 WE TOTAL 13,609 0 Planned Events Less Than or Equal 1 Hour AND <= 5,000 mcf DATE TIME VOLUME DESCRIPTION OF INCIDENT & CAUSE ACTION TAKEN TO ELIMINATE CAUSE 35,548 See attachments See attachments TOTAL 0 Planned Events Exceeding 1 Hour OR> 5,000 mcf DATE TIME VOLUME DESCRIPTION OF INCIDENT & CAUSE ACTION TAKEN TO ELIMINATE CAUSE See attachments See attachments TOTAL 0 TOTAL Unplanned Events < 1 Hour 1,654 Unplanned Events> 1 Hour 13,609 Planned Events < 1 hour and not 0 exceeding 5,000 WE Planned Events > 1 hour or 0 exceeding 5,000 NICE Pilot Purge 20,661 Assist 35,548 TOTAL FLARED VOLUME 71,472 3/13/2015 2:18 PM Flare Start Date 02/0112015 Flare End Date 02/29/2015 CGF Flare Report Total Volume (MSCF) 15263 Report Numbe System Date Start Time Stop Time Duration Intermittent Black Smoke Planned Reported By Volume 15-29 Flare Relief 02/05/2015 12:00:00 am 2:30:00 am 150 min No NO Determination Cause TRC 1854 shutdown due to controNnstrumentation failure associated with PLC Action Taken Started off-line T/C, and stabilized facility process and operation No BPt\GONDEO 11207 15-41 Other 02/18/2015 12:01:00 am 11:59:00 pm 1438 min Yes No No BP1 \NICHC8 Determination Cause Extended flaring event occurred while awaiting operator/maintenance evaluation. Flare valve leak by, parts are on order Action Taken Parts are on order for repair 15-43 Other 02/19/2015 12:01:00 am 11:59:00 pm 1436 min No No No BPlHCHC8 Determination Cause parts are on order for repair of valve leak through Action Taken parts on order 15-45 Other 02/20/2015 12:01:00 am 11:59:00 pm 1438 min No No No BPIMCHC8 Determination Cause Extended flaring event occurred while awaiting operator/maintenance evaluation. awaiting pans for repairing flare valve Action Taken Flare valve closed, leak by repairs awaiting pans 15-46 Other 02/21/2015 12:01:OOam 11:59:00 pm 1438 min No No No BP1\NICHC8 Determination Cause Extended flaring event occurred while awaiting operator/maintenance evaluation. awaiting parts for repair Action Taken Flare valve closed. awaiting parts to repair leak by Generated 03/08/2015 2:03:09PM 622 49 1513 218 Page 3 of 9 Hunt, Jennifer L (DOA) From: AK, OPS PCC EOC TL <AKOPSPCCEOCTL@bp.com> Sent: Friday, February 06, 2015 7:53 PM To: Hunt, Jennifer L (DOA) Cc: Loepp, Victoria T (DOA); Roby, David S (DOA); Castano, Alejandra; Benson, Gary A; Arthur, Gregory; AK, HSSEE Env Adv West; AK, OPS CGF OTL; AK, OPS CCP CGF OSM; Fonenberry, Christopher; AK, OPS GC3&PCC OSM Subject: Gas flaring event atM To: Jennifer Hunt, AOGCC CC: Dave Roby, AOGCC CC: Victoria Ferguson, AOGCC jennifer.hunt(a)alaska.gov dave.roby(d)alaska.gov victoria.ferguson a alaska.g ov From: Jennifer Blake, GPB Production Optimization Team Leader A flaring event occurred at CGF starting at 02/05/2015 00:00 and stopping at 02/05/2015 02:30 with a volume of 11207 (MSCF). The event lasted for 150 minutes. The event had a volume greater than 5000 (MSCF) and occurred when Tandem Compressor 1854 shutdown due to control/instrument failure associated with the PLC. The event stopped when 1854 T/C was depressurized and shut down. Jennifer Blake PCC/EOC Production Optimization Team Lead Office (907) 659-4472 Cell (907) 830-6204 Jennifer.blake@bp.com Hunt, Jennifer L (DOA) From: AK, OPS PCC EOC TL <AKOPSPCCEOCTL@bp.com> Sent: Saturday, February 21, 2015 6:52 PM To: Hunt, Jennifer L (DOA) Cc: Loepp, Victoria T (DOA); Roby, David S (DOA); Castano, Alejandra; Benson, Gary A; Arthur, Gregory; AK, HSSEE Env Adv West; AK, OPS CGF OTL; AK, OPS CCP CGF OSM; Fortenberry, Christopher; AK, OPS GC3&PCC OSM Subject: Gas flaring event a_ Categories: Attention To: Jennifer Hunt, AOGCC CC: Dave Roby, AOGCC CC: Victoria Ferguson, AOGCC iennifer.hunt(d).alaska.gov dave.robvBDalaska.gov, victoria.ferguson(cDalaska.q ov From: Jennifer Blake, GPB Production Optimization Team Leader A flaring event, specifically a leaking flare valve, has occurred at CGF starting at 02/18/2015 00:01 and will be ongoing until valve repair parts are received and the valve is repaired. The leaking valve requires a cage replacement, which is an estimated 3 month lead time for the new parts. We will continue to log the event daily to record gas volumes flared and I will follow up with a phone call on Monday Thank you, Jennifer Blake PCC/EOC Production Optimization Team Lead Office (907) 659-4472 Cell (907) 830-6204 Jennifer. blake@bp.com STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMMISSION FACILITY REPORT OF PRODUCED GAS DISPOSITION 1. Facility Number 0290000008 0290000008 2. Facility Name PBU CGF B 3. Field PBU - EOA 4. Operator BP 5. Month/Vear of Disposition 'T DispositionVolume MCF 20. For production from multiple pools, list contribution of each pool as a percent of Volume. 6. Sold 1,577,233Total Pool Name Pool Code Percent 7. Reinjected 6,155,784 PRUDHOE 640150 100.00%-- 00.00%8. 8.Flared or vented 1 hour or less 804 9. Flared or vented more than 1 hour (see instr.) 0 10. Pilot and Purge 23,512 11. Assist Gas 35,315 12. Fuel gas used in lease operations. 3,130,478 13. Other (see instructions) 0 Official Use Only Authorization>1 hr: Safety MCF 14. TOTAL VOLUME (ITEMS 6-12) 10,923,126 Lease Use MCF 15. NGL Gas Equivalent 1,577,233 Conservation MCF 16. Purchased gas 0 Waste: MCF 17. Transferred from: FS1, FS2, FS3, GC1, GC2 8 GC3 238,588,266 18. Transferred to: (Express as a negative #) FS1, FS2, FS3, CCP 8 GPMA-227,665,140 Commissioner Date 19. Remarks: Block 6: Gas equivalent of NGLs; Block 18: Includes MI Gas to Pt. McIntyre = 762,494 mscf I hereby cenity that the foregoing is true and correct to the best of my knowledge. L Note: All volumes must be corrected Signature I !lY Title Manager Production Taxes and Royalties Alaska to pressure of 14.65 psis and to a temperature of 60o F. Authority 20 Printed Name Diane Cc a Phone (907) 564-5775 Date AAC25.235. Form 10-422 Rev. 512009 INSTRUCTIONS ON REVERSE SIDE Submit in Duplicate STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMMISSION FACILITY REPORT OF PRODUCED GAS DISPOSITION RECEIVED MAY 14 2015 AOGCC 1. Facility Number 0290000008 2. Facility Name PB CGF B 3. Field PBU - EOA 4. Operator BP 5. MonthNear of Disposition I A dl -2015 Disposition Volume MCF 20. For production from multiple pools, list contribution of each pool as a percent of Total Volume. 6. Sold 1,570,955 Pool Name Pool Code Percent 7. Reinjected 5,372,876 PRUDHOE 640150 100.00% 8. Flared or vented 1 hour or less 1,921 9. Flared or vented more than 1 hour (see instr.) 50,501 10. Pilot and Purge 22,167 11, Assist Gas 37,959 12. Fuel gas used in lease operations. 2,968,270 13. Other (see instructions) 0 Official Use Only Authorization >I hr: Safety 56 5 O' MCF 14. TOTAL VOLUME (ITEMS 6-12) 10,024,651 Lease Use MCF 15. NGL Gas Equivalent 1,570,955 Conservation MCF 16. Purchased gas 0 Waste: MCF 17. Transferred from: FSI, FS2, FS3, GCI, GC2&GC3 225,842,184 n ./ 2 Commissioner Date 18. Transferred to: (Express as a negative #) FS1, FS2, FS3, CCP & GPMA -215,817,534 19. Remarks: Block 6: Gas equivalent of NGLs; Block 18: Includes MI Gas to Pt. McIntyre = 1,271,779 Inset I hereby certify that thf foregoing is true and correct to the best of my knowledge. Note: All volumes must be corrected Signature W I ►l & Tiee Mana er Production Taxes and Ro alties Alaska to pressure of 14.65 psia and to a temperature of 60o F. Authority 20 Printed Name Diane Colley Phone (907) 564-5775 Date AAC25.235. V TL z/9/f.(� Form 10-422 Rev. 512009 INSTRUCTIONS ON REVERSE SIDE Submit in Duplicate BP EXPLORATION (ALASKA( INC. PRUDHOE BAY UNIT - CENTRAL GAS FACILITY GAS FLARING INCIDENT REPORT April 2015 RECEIVED MAY 14 2015 4/11/2015 1728-1737 190 Not required for unplanned events <= 1 hr Not required for unplanned events <= 1 hr 4/14/2015 0943-0950 430 4/22/2015 0713-0720 20 4/22/2015 1210-1255 145 4/23/2015 0815-0818 34 TOTAL 819 Unplanned Events greater than 1 hour DATE TIME VOLUME DESCRIPTION OF INCIDENT & CAUSE ACTION TAKEN TO ELIMINATE CAUSE 4/1/2015 0850-1352 715 See attachments See attachments 4/1/2015 0900-1325 48,066 TOTAL 48,781 4/1/2015 4/27/2015 4/27/2015 4/9/2015 4/10/2015 4/11/2015 4/13/2015 1030-1040 0911-0921 2050-2100 TOTAL 0220-0457 0130-0430 0215-0430 0130-0400 TOTAL Unplanned Events < 1 Hour Unplanned Events> 1 Hour Planned Events < 1 hour and not exceeding 5,000 MCF Planned Events > 1 hour or exceeding 5,000 MCF Pilot Purge Assist TOTAL FLARED VOLUME 387 See attachments 328 387 1,102 430 See attachments 430 430 430 1,720 TOTAL 819 48,781 1,102 1,720 22,167 37,959 112,548 See attachments See attachments Page 3 5/13/2015 1:24 PM Flare Start Date 04/01/2015 Flare End Date 04/30/2015 RECEIVE® CGF Flare Report MAY 14 2015 ii. 0%— Total Volume (MSCF) 52422 Report Numbe System AU'Utiv Date StartTime Stop Time Duration Intermittent Black Smoke Planned Reported By Volume 15-88 Flare Relief 04/01/2015 8:50:00 am 1:52:00 pm 302 min No No No BP1\OKINELKJ 715 Determination Cause -RC 1805 shutdown due to a faulty card. Action Taken Repaired equipment malfunction, restarted 1805 T/C, and re ned of cility to normal operation- — 15-88 Flare Relief 04/01/2015 9:00:OOam 1:25:00 pm 265 min No No No _ BP1\CLUBBBW48066 Determination Cause T\C 1805 shutdown for unplanned maintenance causing Stabilizers to overpressure and go to Flare Action Taken Completed troubleshooting, reloaded 1805 T/C, and stabilized facility process and operation. 15-88 Flare Relief 04/01/2015 10:30:00 am 104000 am 10 min No No Yes BP1\OKINELKJ 387 Determination Cause BESD given on 1805 to replace faulty card. Action Taken BESD complete Daily Volume (MSCF) 49168 15-102 Controlled Blowdown 04/09/2015 2:20:00 am 4:57:00 am 157 min No No Yes 3P1\NICHC8 430 Determination Cause TIC 1884 shutdown for Waterwash Action Taken Complete sequence, zero pressure on case. Daily Volume (MSCF) 430 15103 Controlled Blowdown 04/10/2015 1:30:00 am 4:30:00 am 180 min Yes No Yes Determination Cause T/C 1885 shutdown for planned maintenace Action Taken 1885 T/C depressurization completed. BP1\130LDJT 430 Daily Volume (MSCF) 15-105 Controlled Blowdown 04/11/2015 2:15:00 am 4:30:00 am 135 min Yes No Yes BP1\BOLDJT Determination Cause T/C 1886 shutdown for waterwash. Action Taken 1886 T/C depressure completed. 15-106 Controlled Blowdmn 04/13/2015 1:30:00 am 4:00:00 am 150 min Yes Determination Cause Tandem 1 S/D for waterwash Action Taken Flare valves closed Generated 05/08/2015 416 54PM 430 430 No Yes BP1\NICHC8 430 Daily Volume (MSCF) 430 Page 4 of 10 Flare Start Date 04/01/2015 Flare End Date 04/30/2015 RECEIVED MAY 14 2015 15-124 Flare Relief 04/27/2015 9:11:00 am 9:21:00 am 10 min No No Yes BP1\OKINELKJ 328 Determination Cause MI-1T/C 1805 shutdown for Water wash. Action Taken MI -1 de -pressured to 180#, 15-124 Flare Relief 04/27/2015 8:50:00 pm 9:00:00 pm 10 min No No Yes BP1\OKINELKJ 387 Determination Cause Swapped MI machines, after MI -2 s/d, local operator gave 1855 MI -2 a BESD. Action Taken MI -2 de -pressured to 0 pail Daily Volume(MSCF) 715 Total Volume (MSCF) 52422 Generated 05/08/2015 4:16:54PM Page 5 of 10 Hunt, Jennifer L (DOA) From: AK, OPS PCC EOC TL <AKOPSPCCEOCTL@bp.com> Sent: Monday, April 06, 2015 7:31 PM To: Hunt, Jennifer L (DOA) Cc: Loepp, Victoria T (DOA); Castano, Alejandra; Benson, Gary A; Arthur, Gregory; AK, HSSEE Env Adv West; AK, OPS CGF OTL; AK, OPS CCP CGF OSM; Fortenberry, Christopher; AK, OPS GC3&PCC OSM Subject: Gas flaring event at CGF To: Jennifer Hunt, AOGCC CC: Victoria Ferguson, AOGCC lennifer.hunt(a)alaska.gov victoria.fergusonCcD.alaska.gov From: Jennifer Blake, GPB Production Optimization Team Leader A flaring event has occurred at CGF starting at 04/01/2015 08:50 and stopping at 04/01/2015 13:52 with a volume of 48066 (MSCF). The event lasted for 302 minutes. The event had a volume greater than 5000 (MSCF) and was due to tandem compressor 1805 shutdown due to a faulty card. Flaring stopped when the equipment malfunction was repaired and the T/C restarted. Thank you, Jennifer Blake PCC/EOC Production Optimization Team Lead Office (907) 659-4472 Cell (907) 830-6204 Jennifer.blake@bp.com Hunt, Jennifer L (DOA) From: AK, OPS PCC EOC TL <AKOPSPCCEOCTL@bp.com> Sent: Sunday, April 26, 2015 1:29 PM To: Hunt, Jennifer L (DOA) Cc: Loepp, Victoria T (DOA); Castano, Alejandra; Benson, Gary A; Arthur, Gregory; AK, HSSEE Env Adv West; AK, OPS CGF OTL; AK, OPS CCP CGF OSM; Fortenberry, Christopher; AK, OPS GC3&PCC OSM; Loepp, Victoria T (DOA); AK, HSSEE Env Adv Central Subject: Gas flaring event at CGF To: Jennifer Hunt, AOGCC CC: Victoria Ferguson, AOGCC a ennifer.hunt(aalaska.00v victoria.ferguson(c alaska.gov From: Jennifer Blake, GPB Production Optimization Team Leader A flaring event occurred at CGF starting at 04/09/2015 02:20 and stopping at 04/09/2015 04:57 with a volume of 430 (MSCF). The event lasted for 157 minutes and occurred when Tandem Compressor 1884 was shut down for water -wash. The event stopped when 1884 T/C was depressurized to a zero pressure state. Thanks, Jennifer Blake PCC/EOC Production Optimization Team Lead Office (907) 659-4472 Cell (907) 830-6204 Jennifer.blake@bp.com Hunt, Jennifer L (DOA) From: AK, OPS PCC EOC TL <AKOPSPCCEOCTL@bp.com> Sent: Sunday, April 26, 2015 1:32 PM To: Hunt, Jennifer L (DOA) Cc: Loepp, Victoria T (DOA); Castano, Alejandra; Benson, Gary A; Arthur, Gregory; AK, HSSEE Env Adv West; AK, OPS CGF OTL, AK, OPS CCP CGF OSM; Fortenberry, Christopher; AK, OPS GC3&PCC OSM; Loepp, Victoria T (DOA); AK, HSSEE Env Adv Central Subject: Gas flaring event at CGF To: Jennifer Hunt, AOGCC CC: Victoria Ferguson, AOGCC iennifer.hunt(cDalaska.gov victoria.ferquson(cDalaska.gov From: Jennifer Blake, GPB Production Optimization Team Leader A flaring event occurred at CGF starting at 04/10/2015 01:30 and stopping at 04/10/2015 04:30 with a volume of 430 (MSCF). The event lasted for 180 minutes and occurred when Tandem Compressor 1885 was shut down for maintenance. The event stopped when 1885 T/C was depressurized to a zero pressure state. Thanks, Jennifer Blake PCC/EOC Production Optimization Team Lead Office (907) 659-4472 Cell (907) 830-6204 Jennifer.blake@ bp.com Hunt, Jennifer L (DOA) From: AK, OPS PCC EOC TL <AKOPSPCCEOCTL@bp.com> Sent: Sunday, April 26, 2015 1:35 PM To: Hunt, Jennifer L (DOA) Cc: Loepp, Victoria T (DOA); Castano, Alejandra; Benson, Gary A; Arthur, Gregory; AK, HSSEE Env Adv West; AK, OPS CGF OTL; AK, OPS CCP CGF OSM; Fortenberry, Christopher; AK, OPS GC3&PCC OSM; Loepp, Victoria T (DOA); AK, HSSEE Env Adv Central Subject: Gas flaring event at CGF To: Jennifer Hunt, AOGCC CC: Victoria Ferguson, AOGCC Jennifer hunt(a)alaska.00v victoria ferousonaalaska.aov From: Jennifer Blake, GPB Production Optimization Team Leader A flaring event occurred at CGF starting at 04/11/2015 02:15 and stopping at 04/11/2015 04:30 with a volume of 430 (MSCF). The event lasted for 135 minutes and occurred when Tandem Compressor 1886 was shut down for maintenance on the lube oil pressure relieve valve. The event stopped when 1886 T/C was depressurized to a zero pressure state. Thanks, Jennifer Blake PCC/EOC Production Optimization Team Lead Office (907) 659-4472 Cell (907) 830-6204 Jennifer.blake@bp.com Hunt, Jennifer L (DOA) From: AK, OPS PCC EOC TL <AKOPSPCCEOCTL@bp.com> Sent: Sunday, April 26, 2015 1:44 PM To: Hunt, Jennifer L (DOA) Cc: Loepp, Victoria T (DOA); Castano, Alejandra; Benson, Gary A; Arthur, Gregory; AK, HSSEE Env Adv West; AK, OPS CGF OTL; AK, OPS CCP CGF OSM; Fortenberry, Christopher; AK, OPS GC3&PCC OSM; Loepp, Victoria T (DOA); AK, HSSEE Env Adv Central Subject: Gas flaring event at CGF To: Jennifer Hunt, AOGCC CC: Victoria Ferguson, AOGCC iennifer hunt(a-)alaska.aov victoria ferouson(c alaska.00v From: Jennifer Blake, GPB Production Optimization Team Leader A flaring event occurred at CGF starting at 04/13/2015 01:30 and stopping at 04/13/2015 04:00 with a volume of 430 (MSCF). The event lasted for 150 minutes and occurred when Tandem Compressor 1 was shut down for water -wash. The event stopped when T/C 1 was depressurized to a zero pressure state. Thanks, Jennifer Blake PCC/EOC Production Optimization Team Lead Office (907) 659-4472 Cell(907)830-6204 Jennifer.blakec@bp.com Hunt, Jennifer L (DOA) From: AK, OPS PCC EOC TL <AKOPSPCCEOCTL@bp.com> Sent: Monday, May 04, 2015 6:36 AM To: Hunt, Jennifer L (DOA) Cc: Loepp, Victoria T (DOA); Castano, Alejandra; Benson, Gary A; Arthur, Gregory, AK, HSSEE Env Adv West; AK, OPS CGF OTL; AK, OPS CCP CGF OSM; Fortenberry, Christopher; AK, OPS GC3&PCC OSM Subject: Amended: Gas flaring event ak,CGE'! To: Jennifer Hunt, AOGCC CC: Victoria Ferguson, AOGCC iennifer.hunt(o)alaska.gov victoria.ferouson(o)alaska.00v From: Jennifer Blake, GPB Production Optimization Team Leader The flare volume for the flaring event noted below has been amended. The volume has been reduced to 715 mscf. All other details remain the same. Thank you, Jennifer Blake PCC/EOC Production Optimization Team Lead Office (907) 659-4472 Cell (907) 830-6204 Jennifer.blake@bp.com From: AK, OPS PCC EOC TL Sent: Monday, April 06, 2015 7:31 PM To: 'jennifer.hunt@alaska.gov' Cc: 'victoria.ferguson@alaska.gov' (victoria ferauson@alaska.00v); Castano, Alejandra; Benson, Gary A; Arthur, Gregory; AK, HSSEE Env Adv West; AK, OPS CGF OTL; AK, OPS CCP CGF OSM; Fortenberry, Christopher; AK, OPS GC3&PCC OSM Subject: Gas flaring event at CGF To: Jennifer Hunt, AOGCC CC: Victoria Ferguson, AOGCC ennifer.hunt(cDalaska.aov victoria.ferguson(aa alaska.00v From: Jennifer Blake, GPB Production Optimization Team Leader A flaring event has occurred at CGF starting at 04/01/2015 08:50 and stopping at 04/01/2015 13:52 with a volume of 48066 (MSCF). The event lasted for 302 minutes. The event had a volume greater than 5000 (MSCF) and was due to tandem compressor 1805 shutdown due to a faulty card. Flaring stopped when the equipment malfunction was repaired and the T/C restarted. Thank you, Jennifer Blake PCC/EOC Production Optimization Team Lead Office (907) 659-4472 Cell (907) 830-6204 Jennifer.blake@bp.com From: AK, OPS PCC EOC TL [mailto•AKOPSPCCEOCTLC&bp.com] Sent: Monday, November 02, 2015 2:55 PM To: Lcepp, Victoria T (DOA) Subject: RE: PBU Flaring Events Victoria, I have added the comments you requested below for each line. Thank You David Spall (Alternate —Jennifer Blake) PCC/EOC Production Optimization Team Lead 907-659-4472 Office 219-689-4036 Cell david.spall@bp.com From: Loepp, Victoria T (DOA)[mailto:victoria.loeopPalaska.aov] Sent: Wednesday, October 21, 2015 1:58 PM To: AK, OPS PCC EOC TL Subject: RE: PBU Flaring Events See additional events: From: Loepp, Victoria T (DOA) Sent: Wednesday, October 21, 2015 1:51 PM To: AK, OPS PCC EOC TL (AKOPSPCCEOCTL@bp.com) Subject: PBU Flaring Events In reference to the following events: Facility Dates Amt Flared, MSCFD Reason 1. FS -3 5/26-5/28/15 16226 Planned 1802 T/C down, flaring STV and IP gas Issues with the machine, blew it down, they struggled with several additional restarts and finally got 1802 to restart. 2. CGF 4/1/15 48066 Unplanned 1805 T/C down, stabilizers overpressure to flare This was an unplanned issue and they flared to stabilize the plant, they were able to reload 1805 and get the plant stabilized to stop the flaring. 3. FS -2 4/1-4/5/15 28957 Planned 1801 T/C shutdown for planned maintenance This was planned maintenance and to keep the plant from going completely down during the colder temperatures they had to flare 4. FS -1 8/25/15 18944 Unplanned 1803 T/C shutdown, god stage nozzles There was problem associated with 2n1 stage nozzle/clevis slop (2%) they Shut in wells 2-8, 2-34, 2-19, 2-21, 18-11, 2-6, 2-28, 2-22 to stop the flaring. 5. CGF 8/25/15 35569 Unplanned Flared stabilizer overhead after TAPS outage, Low rate issues coming out of the TAPS outage, They were able to start the MI Machine which closed the flare valves. For each event, explain what happened and what measures were taken to mitigate flaring such as shut in production. If production was not shut in, why not? Thanx, Victoria Victoria Loepp Senior Petroleum Engineer State of Alaska Oil & Gas Conservation Commission STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMMISSION FACILITY REPORT OF PRODUCED GAS DISPOSITION RECEIVED JUN 16 2015 AOGCC 1. Facility Number 0290000008 2. Facility Name PBU CGF B 3. Field PBU - EOA 4. Operator BP 5. MonthNear of Disposition Ma -2015 Disposition Volume MCF 20. Forproduction from multiple pools, list contribution of each pool as a percent of Total Volume, 6. Sold 1,429,213 Pool Name Pool Code Percent 7. Reinjected 4,035,002 PRUDHOE 640150 100.00% 8. Flared or vented 1 hour or less 2,985 9. Flared or vented more than 1 hour (see instr.) 3,282 10. Pilot and Purge 21,703 11. Assist Gas 41,187 12. Fuel gas used in lease operations. 2,792,902 13. Other (see instructions) 0 Official Use Only Authorization >1 hr: Safety ,? Z $ Z MCF 14. TOTAL VOLUME (ITEMS 6-12) 8,326,274 Lease Use MCF 15. NGL Gas Equivalent 1,429,213 Conservation MCF 16. Purchased gas 0MCF Waste: 17. Transferred from: FS1, FS2, FS3, GC1, GC2 8 GC3 208,321,553WKV � 7. 38 -Is- 1518. 18.Transferred to: (Express as a negative #) FS1, FS2, FS3, CCP & GPMA -199,995,281 Commissioner Date 19. Remarks: Block 6: Gas equivalent of NGLs; Block 18: Includes MI Gas to Pt. McIntyre = 1,667,106 mscf I hereby certify that theforegoingis true and correct to the best of my knowledge. 1 J / C&^ Note: All volumes must be corrected Signature_ OOO...yyy{ /1 Title Mana er Production Taxes and Ro alties Alaska to pressure of 14.65 psla and to n / temperature of 60o F. Authority 20 Printed Name Diane Colley Phone (907) 564-5775 Date AAC25.235. Form 10-422 Rev. 5/2009 INSTRUCTIONS ON REVERSE SIDE Submit in Duplicate SP EXPLORATION (ALASKA) INC. RECEIVED PRUDHOE BAY UNIT- CENTRAL GAS FACILITY ,JUN 16 2015 GAS FLARING INCIDENT REPORT May 2015 fl ®GAC Page 3 Unplanned Events less than or equal to 1 hour 1300-1800 DATE TIME VOLUME DESCRIPTION OF INCIDENT & CAUSE ACTION TAKEN TO ELIMINATE CAUSE 5/6/2015 1020-1031 400 Not required for unplanned events <= 1 hr Not required for unplanned events <= 1 hr 5/7/2015 1419-1455 430 5/8/2015 1128-1146 400 5/25/2015 1427-1500 387 5/25/2015 1624-1628 143 0226-0255 TOTAL 1,760 5/9/2015 1300-1800 3,282 See attachments See attachments TOTAL 3,282 Planned Events Less Than or Equal 1 Hour AND <= 5,000 mcf DATE TIME VOLUME DESCRIPTION OF INCIDENT & CAUSE ACTION TAKEN TO ELIMINATE CAUSE 5/9/2015 0225-0236 195 See attachments See attachments 5/9/2015 0226-0255 195 5/9/2015 0953-1014 60 5/9/2015 0958-1020 60 5/25/2015 1725-1750 328 5/26/2015 0223-0233 387 TOTAL 1,225 Planned Events Exceeding 1 Hour OR > 5,000 mcf DATE TIME VOLUME DESCRIPTION OF INCIDENT & CAUSE ACTION TAKEN TO ELIMINATE CAUSE See attachments See attachments TOTAL 0 6/12/2015 10:03 AM BP EXPLORATION (ALASKA) INC. PRUDHOE BAY UNIT- CENTRAL GAS FACILITY GAS FLARING INCIDENT REPORT May 2015 RECEIVED JUN 16 2015 AOGCC Page 4 6/12/2015 10:03 AM TOTAL Unplanned Events < 1 Hour 1,760 Unplanned Events> 1 Hour 3,282 Planned Events < 1 hour and not 1,225 exceeding 5,000 MCF Planned Events > 1 hour or 0 exceeding 5,000 MCF Pilot Purge 21,703 Assist 41,187 TOTAL FLARED VOLUME 69,157 RECEIVED JUN 16 2015 AOGCC Page 4 6/12/2015 10:03 AM OL lO Z abed WV69:ES:9 9LOE/90/90 palwauaO Aq-puels lol pwnsswd-ap L -IW asnep uopeulwelaa Lee f91l3NIH0\Ld9 sq), ON ON ulw OL we OO:EE:Z we00:EZ:Z SLOZ/9Z/90 umOpmOl9pall0jlu0O 99L -9L 099 (jOSW) ownloA AI!e0 pa)aldwm uollemnsswdap 011909E u0jel uOpotl wueuelulew pauue!d uo/ umopings SOHL O\1 89ne0 UO!leu!wJalaa 9Z£ 1fO109\Ld9 SOA ON ON up SZ wd 00:09:9 wd00:9Z:S 9tOZ/9Z/SO umopmolepallwWOO bSL-9L z6LE (dOSW) awnlOA ApeO plum japun lueld agl lab of paldwaAe !auuowad suo!lwado al!gm anulluoo of paA!wiad sem 6uuelj U83jel UopOtl 'uog0npwd w situ pannbw pue buueg/slasdn lueld u! Pallnsw s6u!ms uo!lwwd asneo uopeuluualaa ZHZE m999O10\Ld9 ON ON saA u!w OOE wd 00:00:9 wd00:00:t SLOZ/60/90 Jagl0 z9z)c 9E L -SL pasop sanlen weU ua>tel uollotl gsewalem pue >pom lu!ew dol !sd0 01 L jalsoo9 pazunssaidep esne0 uolleuluualaa 09 90H0IMLd9 saA ON ON WWZZ we00:OZ:OL we00:89:6 MZ/60190 191188 we1j KL -9L pasOlO sanlen Wel j uailel U0140tl gsewalem pue wueuelu!ew jol!sd0 of Z ialwoe pezunsswdaO esne0 uolleulwialaa 09 H0H01N4d9 saA ON ON u!w LZ we 00:4L:0L we OO:69:6 MZ/60190 181198 weld 9EL-9L pasop sanlen weld uailel uoll0tl gsemjalem lo; pwnsswdap Z09L 0\1 esneD uogeulwianaa 96L 90HOINUd9 SOA ON ON lulu 6Z we 00:99:Z we00:9Z:Z SLOZ/60/90 pla8 weld 9CL-9L pasop sanlen wag uallel uo!lotl gsemmjalemjol pwnsswdap LOHL O\1 asneC)uopeu!wjalaa 96L 93HOIN\Ld9 saA ON ON ulw LL we 00:9E:Z we00:SZ:Z 9LOZ/60/90 )Hoa weld 9U -9L V00®V _ SEUL--J—V Tr a3Al3a3H awnl0A AS papodaa pauueld allowg>Ioelg luaR!uualul uo!launo awll dolg owll ping alea walsAS egwnN podaa L9Z9 (dOSW) awnlOA Ie301 podaa meld d9:) SLOZ/LE/SO alio pu3 we!j SLOZ/Lo/90 oleo gels we! j Flare Start Date 05/01/2015 Flare End Date 05/31/2015 Action Taken MI -1 de -pressure completed. Volume indicated on Meter 618, Daily Volume (MSCF) 387 Total Volume (MSCF) 6267 RECEIVED JUN 16 2015 ,ACGCC Generated 06/08/2015 8:53:39AM Page 3 of 10 STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMMISSION FACILITY REPORT OF PRODUCED GAS DISPOSITION 1. Facility Number 0290000008 2. Facility Name PBU GIF B 3. Field PBU - EOA 4. Operator BP 5. MonthNear of Disposition June -2015 Disposition Volume MCF 20. For production from multiple pools, list contribution of each pool as a percent of Total Volume. 6. Sold 1,122,924 Pool Name Pool Code Percent 7. Reinjected 3,124,258 PRUDHOE 640150 100.00% 8. Flared or vented 1 hour or less 431 9. Flared or vented more than 1 hour (see instr.) 3,395 10. Pilot and Purge 21,055 11. Assist Gas 46,459 12. Fuel gas used in lease operations. 2,420,145 13. Other (see instructions) O`�� Authorization >1 hr. Safety 33 9 T MCF 74. TOTAL VOLUME (ITEMS 6-72) 6,738,667 Lease Use MCF 15. NGL Gas Equivalent 1,122,924 Conservation MCF 16. Purchased gas Waste: MCF 17. Transferred from: FSI, FS2, FS3, GC1, GC2 & GC3 174,802,87024 .2 — / tr 18. Transferred to: (Express as a negative # FS1, FS2, FS3, CCP & GPMA ( p 9 ) -168,064,202 Commissioner Date 19. Remarks: Block 6: Gas equivalent of NGLs; Block 18: Includes MI Gas to Pt. McIntyre = 1,646,327 mscf I hereby certify that the foregoing is true and correct to the best of my knowledge. /y�� //1;/j!}�%,�� ,1 Note: All volumes must be corrected Signature '/ /,C (i4�TCJaC// Title Manager Production Taxes and Royalties Alaska to pressure of 14.65 psis and to a temperature of 60o F. Authority 20 Printed Name Diane ColleyPhone (907) 564-5775 Date AAC25.235. V%L Form 10-422 Rev. 5/2009 INSTRUCTIONS ON REVERSE SIDE Submit in Duplicate BP EXPLORATION (ALASKA) INC. PRUDHOE BAY UNIT- CENTRAL GAS FACILITY GAS FLARING INCIDENT REPORT June 2015 Unplanned Events less than or equal to 1 hour DATE TIME VOLUME DESCRIPTION OF INCIDENT & CAUSE ACTION TAKEN TO ELIMINATE CAUSE 6/17/2015 1600-1634 1 Not required for unplanned events <= 1 hr Not required for unplanned events <= 1 hr TOTAL 1 Page 3 6/8/2015 0830-1130 195 See attachments See attachments TOTAL 195 Planned Events Less Than or Equal 1 Hour AND <= 5,000 mcf DATE TIME VOLUME DESCRIPTION OF INCIDENT & CAUSE ACTION TAKEN TO ELIMINATE CAUSE 6/12/2015 0358-0424 430 See attachments See attachments TOTAL 430 Planned Events Exceeding 1 Hour OR > 5,000 mcf DATE TIME VOLUME DESCRIPTION OF INCIDENT & CAUSE ACTION TAKEN TO ELIMINATE CAUSE 6/23/2015 1927-2150 3,200 See attachments See attachments TOTAL 3,200 7/15/2015 3:53 PM BP EXPLORATION (ALASKA) INC. PRUDHOE BAY UNIT - CENTRAL GAS FACILITY GAS FLARING INCIDENT REPORT June 2015 Page 4 7/15/2015 3:53 PM TOTAL Unplanned Events < 1 Hour 1 Unplanned Events> 1 Hour 195 Planned Events < 1 hour and not 430 exceeding 5,000 MCF Planned Events> 1 hour or 3,200 exceeding 5,000 MCF Pilot Purge 21,055 Assist 46,459 TOTAL FLARED VOLUME 71,340 Page 4 7/15/2015 3:53 PM Flare Start Date 06/01/2015 Flare End Date 06/30/2015 CGF Flare Report Total Volume (MSCF) 3826 Report Numbe System Date StartTime Stop Time Duration Intermittent Black Smoke Planned Reported By Volume 15-177 Controlled Slowdown 08/08/2015 8:30:00 am 11:30:00 am 180 min Yes No No BP7\CONNK7 195 Determination Cause TIC 1802 shutdown due to controhinstrumentation failure associated with N2 speed probe detection Action Taken Flare valve closed Daily Volume (MSCF) 195 15-194 Controlled Blowdown 06/12/2015 3:58:00 am 4:24:00 am 26 min No No Yes BP7\CRAMBL 430 Determination Cause turbine compressor 1885 S/D due to TAPS Proration Action Taken Turbine Compressor 1885 Depressurization completed Daily Volume (MSCF) 430 15-205 Other 06/23/2015 7:27:00 pm 9:50:00 pm 143 min No No Yes BP1\HAMACKC 3200 Determination Cause Depressured the AGI#1 to allow for line lift and removal of vehicle trapped under piping. Action Taken Completed depressudng the line Daily Volume (MSCF) 3200 Total Volume (MSCF) 3826 Generated 07/02/2015 3:52:31PM Page 3 of 12 Hunt, Jennifer L (DOA) From: AK, OPS PCC EOC TL <AKOPSPCCEOCTL@bp.com> Sent: Monday, June 08, 2015 5:48 PM To: Hunt, Jennifer L (DOA) Cc: Loepp, Victoria T (DOA); Castano, Alejandra; Benson, Gary A; Arthur, Gregory, AK, HSSEE Env Adv West; AK, OPS GC3&PCC OSM; Borton, Kim; AK, OPS CGF OTL; AK, OPS CCP CGF OSM Subject: Flaring Event at CGF To: Jennifer Hunt, AOGCC CC: Victoria Ferguson, AOGCC 4ennifer.hunt(o)alaska.00v victoria.ferouson(o)alaska.00v From: David Spall, GPB Production Optimization Team Leader A flaring event occurred at CGF starting at 06/08/2015 08:30 and stopping at 06/08/2015 11:30 with a volume of 195 (MSCF). The event lasted for 180 minutes and was due to T/C 1802 shutdown due to control\instrumentation failure associated with N2 speed probe detection. The event stopped when the flare valve closed. Thanks Dave David Spall (Alternate —Jennifer Blake) PCC/EOC Production Optimization Team Lead 907-659-4472 Office 219-689-4036 Cell david.spall@bp.com Hunt, Jennifer L (DOA) From: AK, OPS PCC EOC TL <AKOPSPCCEOCTL@bp.com> Sent: Friday, June 26, 2015 8:21 AM To: Hunt, Jennifer L (DOA) Cc: Loepp, Victoria T (DOA); Castano, Alejandra; Benson, Gary A; Arthur, Gregory; AK, HSSEE Env Adv West; AK, OPS GC3&PCC OSM; Fortenberry, Christopher; AK, OPS CGF OTL; AK, OPS CCP CGF OSM Subject: Flaring Event a To: Jennifer Hunt, AOGCC CC: Victoria Ferguson, AOGCC iennifer hunt(cDalaska.go victoria ferouson(a2alaska.gov From: Jennifer Blake, GPB Production Optimization Team Leader A Flaring event occurred at CGF starting at 06/23/2015 19:27 and stopping at 06/23/2015 21:50 with a volume of 3200 (MSCF). The event lasted for 143 minutes and was due to depressurizing the AGI #1 supply line to allow for a line lift. The event stopped when the depressurizing was completed. A flaring event occurred at CGF starting at 06/17/2015 16:00 and stopping at 06/17/2015 16:34 with a volume of 1 (MSCF). The event lasted 34 minutes, was a black smoke event and was due to operations personnel blowing down low point drains during the LTS 2 Derime. The event stopped when the low point drains were closed. Thanks, Jennifer Blake PCC/EOC Production Optimization Team Lead (alt David Spall) Office (907) 659-4472 Cell (907) 830-6204 Jennifer.blake@bp.com STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMMISSION FACILITY REPORT OF PRODUCED GAS DISPOSITION 1. Facility Number 0290000008 2. Facility Name PBU CGF B 3. Field PBU - EOA 4. Operator BP 5. Month/Year of Disposition July -2015 Disposition Volume MCF 20. Forproduction from multiple pools, list contribution of each pool as a percent of Total Volume. 6. Sold 1,217,693 Pool Name Pool Code Percent 7. Reinjected 3,790,455 PRUDHOE 640150 100.00% 8. Flared or vented 1 hour or less 374 9. Flared or vented more than 1 hour (see insV.) 0 10. Pilot and Purge 21,798 11. Assist Gas 41,102 12. Fuel gas used in lease operations. 2,575,012 13. Other (see instructions) 0 Official Use Only Authorization >I hr: Safely MCF 14. TOTAL VOLUME (ITEMS 6-12) 7,646,434 Lease Use MCF 15. NGL Gas Equivalent 1,217,693 Conservation MCF 16. Purchased gas 0 Waste: MCF 17. Transferred from: FS1, FS2, FS3, GC1, GC2 & GC3 166,097,439 Commissioner Date 18. Transferred to: (Express as a negative #) FS1, FS2, FS3, CCP & GPMA -158,451,005 19. Remarks: Block 6: Gas equivalent of NGLs; Block 18: Includes MI Gas to Pt. McIntyre = 1,133,883 mscf I hereby certify that the foregoing is true and correct to the best of my knowledge. Signature G Title Mana er Production Taxes and Royalties Alaska �(0Q Note: All volumes must is corrected to pressure of 14.65 psla and t0 a temperature of 60o F. Authority 20 AAC25.235. Printed Name Diane ColleyPhone (907) 564-5775 Date Form 10-422 Rev. 5/2009 INSTRUCTIONS ON REVERSE SIDE Submit in Duplicate STATE OF ALASKA I,11/MM611WrIZeT.W61i1101-la L•�iL ZWO I i7�l�iMme k FACILITY REPORT OF PRODUCED GAS DISPOSITION 1. Facility Number 0290000008 2. Facility Name JPBU CGF B 3. Field PBU - EOA 4. Operator BP 5. MonthNear of Disposition August -2015I Disposition Volume MCF 20. For production from multiple pools, list contribution of each pool as a percent of Total volume. 6. Sold 915,089 Pool Name Pool Code Percent 7. Reinjected 2,984,324 PRUDHOE 640150 100.00% 8. Flared or vented 1 hour or less 4,267 9. Flared or vented more than 1 hour (see instr.) 36,231 10. Pilot and Purge 21,767 11. Assist Gas 59,838 12. Fuel gas used in lease operations. 2,157,684 13. Other (see instructions) 0 Official Use Only Authorization >I hr: Saferyy(o 231 MCF 14. TOTAL VOLUME (ITEMS 6-12) 6,179,200 Lease Use MCF 15. NGL Gas Equivalent 915,089 Conservation MCF 16. Purchased gas U Waste: MCF 17. Transferred from: FSI, FS2, FS3, GC1, GC2 & GC3 154,628,629 ^ / 2-11— /4 18. Transferred Transferred to: (Express as a negative #) FSI, FS2, FS3, CCP 8 GPMA -148,449,429 Commissioner Date! 19. Remarks: Block 6: Gas equivalent of NGLs; Block 18: Includes MI Gas to Pt. McIntyre = 950,056 mscf Erebtrat /thee foregoing is Vue and correct to the best of my knowledge. 6I,Note: All volumes must be corrected 1 (��f�/ Title Mana er Production Taxes and Ro alties Alaska to pressure of 14.65 psis and to a temperature of 60o F. Authority 20 Diane Colley Phone (907) 564-5775 Date C71ILk AAC25.235. VT'— Z/4/it Form 10-422 Rev. 5/2009 INSTRUCTIONS ON REVERSE SIDE Submit in Duplicate BP EXPLORATION (ALASKA) INC. PRUDHOE BAY UNIT - CENTRAL GAS FACILITY GAS FLARING INCIDENT REPORT August 2015 Page 3 DATE TIME VOLUME DESCRIPTION OF INCIDENT & CAUSE ACTION TAKEN TO ELIMINATE CAUSE 8/1/2015 2305-2359 387 Not required for unplanned events <= 1 hr Not required for unplanned events <= 1 hr 8/24/2015 1300-1330 87 8/26/2015 1300-1320 430 TOTAL 904 Unplanned Events greater than 1 hour DATE TIME VOLUME DESCRIPTION OF INCIDENT & CAUSE ACTION TAKEN TO ELIMINATE CAUSE 8/25/2015 0100-2200 35,569 See attachments See attachments TOTAL 35,569 Planned Events Less Than or Equal 1 Hour AND <= 5,000 mcf DATE TIME VOLUME DESCRIPTION OF INCIDENT & CAUSE ACTION TAKEN TO ELIMINATE CAUSE 8/5/2015 1240-1250 190 See attachments See attachments 8/21/2015 0240-0255 430 8/21/2015 0240-0255 430 8/21/2015 0240-0255 430 8/21/2015 0320-0335 255 8/21/2015 0320-0335 255 8/21/2015 0328-0343 430 8/21/2015 0408-0423 387 8/21/2015 0430-0450 206 8/21/2015 1510-1525 350 TOTAL 3,363 8/1/2015 1310-1530 8/21/2015 0825-1141 TOTAL 387 See attachments 275 662 See attachments 9/11/2015 10:38 AM BP EXPLORATION (ALASKA) INC. PRUDHOE BAY UNIT - CENTRAL GAS FACILITY GAS FLARING INCIDENT REPORT August 2015 Page 4 9/11/2015 10:38 AM TOTAL Unplanned Events < 1 Hour 904 Unplanned Events> 1 Hour 35,569 Planned Events < 1 hour and not 3,363 exceeding 5,000 MCF Planned Events> 1 hour or 662 exceeding 5,000 MCF Pilot Purge 21,767 Assist 59,838 TOTAL FLARED VOLUME 122,103 Page 4 9/11/2015 10:38 AM Flare Start Date 08/01/2015 Flare End Date 08/31/2015 CGF Flare Report Total Volume (MSCF) 40498 Report Numbe System Date Start Time Stop Time Duration Intermittent Black Smoke Planned Reported By Volume 15-252 Flare Relief 08/01/2015 1:10:00 pm 3:30:00 pm 140 min Yes No Yes BP1\PAGED2 387 Determination Cause Shut dawn 1855 MI compressor#2 for planned maintenance. Ended up De -pressuring to Zero PSI Action Taken Compressor vented to zero and the flare valves closed 15-259 Flare Relief 08/05/2015 12:40:00 pm 12:50:00 pm 10 min No No Determination Cause Shut down Tandem 1884 for planned maintenance Type A shutdown METER 618 Action Taken Compressor depressured and Bare valves dosed 15-274 Flare Relief 08/21/2015 2:40:00 am 2:55:00 am 15 min No No Determination Cause Tandem #4 (1886) Shutdown for taps outage Action Taken Completed blowdown 15-274 Flare Relief 08/21/2015 2:40:00 am 2:55:00 am 15 min No No Determination Cause Tandem #2 (1884) shutdown for planned taps outage Action Taken Completed blowdown Yes BP1\PAGED2 Daily Volume (MSCF) Yes BPI\CRAMBL Yes BPt\CRAMBL 190 190 430 430 15-274 Flare Relief 08/21/2015 2:40:DDam 2:55:00 am 15 min No No Yes BPI\CRAMBL 430 Determination Cause Tandem #1 (1883) shutdown for planned taps outage Action Taken Completed blowdown 15-274 Flare Relief 08/21/2015 320:00 am 3:35:00 am 15 min No No Yes BPI\CRAMBL 255 Determination Cause Booster#1 (1802) shutdown for planned taps outage. Action Taken Completed Blowdown 15-274 Flare Relief 08/21/2015 320:00 am 3:35:00 am 15 min No No Yes BPI\CRAMBL 255 Determination Cause Booster#1(1801) Shutdown for planned taps outage Action Taken Completed blowdawn 15-274 Flare Relief 08/21/2015 3:28:00 am 3:43:00 am 15 min No No Yes BPI\CRAMBL 430 Determination Cause Tandem #3 (1885) Shutdown for planned taps outage. Action Taken Completed blowdown 15-274 Flare Relief 08/21/2015 4:08:00 am 4:23:00 am 15 min No No Yes BP1\CRAMBL 387 Determination Cause MI#2(1855) Planed shutdcwn for taps outage Action Taken Completed blowdown 15-274 Flare Relief 08/21/2015 4:30:00 am 4:50:00 am 20 min No No Yes BP1\CRAMBL 206 Determination Cause Blew down Stabilizers to 200 psig for planned taps outage Action Taken Completed blow down 15-274 Flare Relief 08/21/2015 8:25:00 am 11:41:00 am 196 min No No Yes BP1\CRAMBL 275 Determination Cause DepressureWOA 60" for Line lift during taps outage. Action Taken Depressure line to 220 psig and blocked the line in from the flare. 15-274 Flare Relief 08/21/2015 3:10:00 pm 3:25:00 pm 15 min No No Yes BP1\CRAMBL 350 Determination Cause booster #3 (1857) shutdown during taps for planned maintenance. Generated 09/02/2015 9:47:02AM Page 3 of 10 Flare StartDate 08/01/2015 Flare End Date 08/31/2015 Action Taken compressor depressured 15-294 Flare Relief 08/25/2015 1:00:00 am 10:00:00 pm 1260 min No Determination Cause Awaiting rate after TAPS outage flared STAB overhead Action Taken MI machine started and Flare valves closed No No BP1\NICHCB 35569 Daily Volume (MSCF) 35569 Total Volume (MSCF) 40498 Page Generated 09/02/2015 9:47:02AM Hunt, Jennifer L (DOA) From: AK, OPS PCC EOC TL <AKOPSPCCEOCTL@bp.com> Sent: Sunday, August 09, 2015 12:34 PM To: Hunt, Jennifer L (DOA) Cc: Loepp, Victoria T (DOA); Castano, Alejandra; Benson, Gary A; Arthur, Gregory; AK, HSSEE Env Adv West; AK, OPS CGF OTL; AK, OPS CCP CGF OSM; Fortenberry, Christopher; AK, OPS GC3&PCC OSM; AK, HSSEE Env Adv Central Subject: Gas flaring event at To: Jennifer Hunt, AOGCC CC: Victoria Leopp, AOGCC iennifer hunt(dalaska.aov victoria loeppealaska oov From: David Spall, GPB Production Optimization Team Leader A flaring event occurred at CGF starting at 08/01/2015 13:10 and stopping at 08/01/2015 15:30 with a volume of 387 (MSCF). The event lasted for 140 minutes and occurred when Shut down 1855 MI compressor #2 for planned maintenance. The event stopped when Compressor vented to zero and the flare valves closed. Thanks, Dave David Spall (Alternate—Jennifer Blake) PCC/EOC Production Optimization Team Lead 907-659-4472 Office 219-689-4036 Cell david spall bp.com From: AK, OPS PCC EOC TL fmailto:AKOPSPCCEOCTL(obbo.com] Sent: Monday, November 02, 2015 2:55 PM To: Loepp, Victoria T (DOA) Subject: RE: PBU Flaring Events Victoria, I have added the comments you requested below for each line Thank You David Spall (Alternate—Jennifer Blake) PCC/EOC Production Optimization Team Lead 907-659-4472 Office 219-689-4036 Cell david spall bp.com From: Loepp, Victoria T (DOA) [mailto:victoria IoeppC)alaska.gov] Sent: Wednesday, October 21, 2015 1:58 PM To: AK, OPS PCC EOC TL Subject: RE: PBU Flaring Events See additional events: From: Loepp, Victoria T (DOA) Sent: Wednesday, October 21, 2015 1:51 PM To: AK, OPS PCC EOC TL (AKOPSPCCEOCTL bp.com) Subject: PBU Flaring Events In reference to the following events: Facility Dates Amt Flared, MSCFD Reason 1. FS -3 5/26-5/28/15 16226 Planned 1802 T/C down, flaring STV and IP gas Issues with the machine, blew it down, they struggled with several additional restarts and finally got 1802 to restart. 2. CGF 4/1/15 48066 Unplanned 1805 T/C down, stabilizers overpressure to flare This was an unplanned issue and they flared to stabilize the plant, they were able to reload 1805 and get the plant stabilized to stop the flaring. 3. FS -2 4/1-4/5/15 28957 Planned 1801 T/C shutdown for planned maintenance This was planned maintenance and to keep the plant from going completely down during the colder temperatures they had to flare 4. FS -1 8/25/15 18944 Unplanned 1803 T/C shutdown, 2nd stage nozzles There was problem associated with 2"d stage nozzle/clevis slop (2%) they Shut in wells 2-8, 2-34, 2-19, 2-21, 18-11, 2-6, 2-28, 2-22 to stop the flaring. 5. CGF 8/25/15 35569 Unplanned Flared stabilizer overhead after TAPS outage, Low rate issues coming out of the TAPS outage, They were able to start the MI Machine which closed the flare valves. For each event, explain what happened and what measures were taken to mitigate flaring such as shut in production. If production was not shut in, why not? Thanx, Victoria Victoria Loepp Senior Petroleum Engineer State of Alaska Oil & Gas Conservation Commission STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMMISSION FACILITY REPORT OF PRODUCED GAS DISPOSITION 1. Facility Number 0290000008 2. Facility Name PBU CGF B 3. Field PBU - EOA 4. Operator BP 5. Month/Vear of Disposition September -2015 Disposition Volume MCF 20. For production from multiple pools, list contribution of each pool as a percent of Total volume. 6. Sold 1,237,572 Pool Name Pool Code Percent 7. Reinjected 3,652,605 PRUDHOE 640150 100.00% 8. Flared or vented l hour or less 3,764 9. Flared or vented more than 1 hour (see instr.) 0 10. Pilot and Purge 21,010 11. Assist Gas 40,152 12. Fuel gas used in lease operations. 2,687,279 Other (see instructions) 0 Official Use Only13. Authorization >1 hr: Safety MCF 14. TOTAL VOLUME (ITEMS 6.12) 7,642,382 Lease Use MCF 15. NGL Gas Equivalent 1,237,572 Conservation MCF 16. Purchased gas 0 Waste: MCF 17. Transferred from: FS1, FS2, FS3, GC1, GC2 & GC3 205,884,992 18. Transferred to: (Express as a negative ff FS1, FS2, FS3, CCP & GPMA ( p 9 ) -198,242,608 Commissioner Date 19. Remarks: Block 6: Gas equivalent of NGLs; Block 18: Includes MI Gas to Pt. McIntyre = 1,070,207 mscf I hereby certify that the foregoing is true and correct to the best of my knowledge. n'�y� Note: All volumes must be corrected Signature (�F{/,r//u Title Mana er Production Taxes and Ro alties Alaska to pressure of 14.65 psis and to a temperature of 60o F. Authority 20 Printed Name Diane Colley Phone (907) 564-5775 Date AAC25.235. Form 10-422 Rev. 512009 INSTRUCTIONS ON REVERSE SIDE Submit in Duplicate SP EXPLORATION (ALASKA) INC. PRUDHOE BAY UNIT • CENTRAL GAS FACILITY GAS FLARING INCIDENT REPORT September 2015 Page 2 Unplanned Events less than or equal to 1 hour DATE TIME VOLUME DESCRIPTION OF INCIDENT & CAUSE ACTION TAKEN TO ELIMINATE =USE 9/21/2015 1100-1115 400 Not required for unplanned events <= 1 hr Not required for unplanned events <= 1 hr 9/21/2015 1740-1755 400 9/28/2015 1535-1545 430 9/28/2015 1600-1612 328 9/28/2015 1653-1702 387 9/28/2015 1654-1719 1,819 TOTAL 3,764 See attachments See attachments TOTAL 0 Planned Events Less Than or Equal 1 Hour AND <= 5,000 mcf DATE TIME VOLUME DESCRIPTION OF INCIDENT & CAUSE ACTION TAKEN TO ELIMINATE CAUSE See attachments See attachments TOTAL 0 Events Exceeding 1 Hour OR > See attachments TOTAL 0 See attachments 10/15/2015 10:43 AM BP EXPLORATION (ALASKA) INC. PRUDHOE BAY UNIT- CENTRAL GAS FACILITY GAS FLARING INCIDENT REPORT September 2015 TOTAL Unplanned Events < 1 Hour 3,764 Unplanned Events> 1 Hour 0 Planned Events < 1 hour and not 0 exceeding 5,000 MCF Planned Events > 1 hour or 0 exceeding 5,000 MCF Pilot Purge 21,010 Assist 40,152 TOTAL FLARED VOLUME 64,926 Page 3 10/15/2015 10:43 AM Flare Start Date 0 9/0 11201 5 Flare End Date 09/30/2015 CGF Flare Report Total Volume (MSCF) 3764 Report Numbe System Date StartTime Stop Time Duration Intermittent Black Smoke Planned Reported By Volume Generated 10/02/2015 24830PM Page 2 of 8 STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMMISSION FACILITY REPORT OF PRODUCED GAS DISPOSITION 1. Facility Number 0290000008 2. Facility Name PBU CGF B 3. Field PBU - EOA 4. Operator BP 5. Month/Year of Disposition October -2015 Disposition Volume MCF 20. For production from multiple pools, list contribution of each pool as a percent of Total Volume. ' 6. Sold 1,470,550 Pool Name Pool Code Percent 7. Reinjected 3,795,556 PRUDHOE 640150 100.00% 8. Flared or vented 1 hour or less 3,151 9. Flared or vented more than 1 hour (see instr.) 1,390 . 10. Pilotand Purge 21,826 11. Assist Gas 44,560 ' 12. Fuel gas used in lease operations. 2,733,517 13. Other (see instructions) 0 Official Use Only • ' Authorization >1 hr Safety MCF 14. TOTAL VOLUME (ITEMS 6-12) 8,070,552 Lease Use MCF 15. NGL Gas Equivalent 1,470,550 Conservation MCF 16. Purchased gas 0 Waste: MCF 17. Transferred from: FS1, FS2, FS3, GC1, GC2 & GC3 221,145,084 ' -•r�_ 2G— /6 _! S ?12--16—IS- 18. 18. Transferred to: (Express as a negative #) FS7, FS2, FS3, CCP & GPMA -213,074,532 Commissioner Date 19. Remarks: Block 6: Gas equivalent of NGLs; Block 18: Includes MI Gas to Pt. McIntyre = 1,057,493 mscf I hereby certify that the foregoing is We and correct to the best of my knowledge. M � Note: All volumes must be corrected Signature �i/ U (XX�fLILV,[/� Title Manager Production Taxes and Royalties Alaska to pressure of 14.65 psis and to a temperature of 60o F. Authority 20 Printed Name Diane Colley Phone (907) 564-5775 Date AAC25.235. b' T Form 10-422 Rev. 5/2009 INSTRUCTIONS ON REVERSE SIDE Submit in Duplicate BP EXPLORATION (ALASKA) INC. PRUDHOE BAY UNIT- CENTRAL GAS FACILITY GAS FLARING INCIDENT REPORT October 2015 Page 3 Unplanned Events less than or equal to 1 hour TIME DATE TIME VOLUME DESCRIPTION OF INCIDENT & CAUSE ACTION TAKEN TO ELIMINATE CAUSE 10/20/2015 1400-1410 19 Not required for unplanned events <= 1 hr Not required for unplanned events <= 1 hr 10/27/2015 1249-1301 195 10/31/2015 1036-1041 35 DATE TOTAL 249 DATE TIME VOLUME DESCRIPTION OF INCIDENT & CAUSE ACTION TAKEN TO ELIMINATE CAUSE 10/26/2015 2123-2240 390 See attachments See attachments TOTAL 390 Planned Events Less Than or Equal 1 Hour AND <= 5,000 mcf DATE TIME VOLUME DESCRIPTION OF INCIDENT & CAUSE ACTION TAKEN TO ELIMINATE CAUSE 10/9/2015 0430-0445 430 See attachments See attachments 10/11/2015 0130-0145 430 10/20/2015 1455-1501 387 10/20/2015 1640-1702 328 10/23/2015 0400-0414 387 10/24/2015 0153-0205 510 10/30/2015 1346-1358 430 TOTAL 2,902 Planned Events Exceeding 1 Hour OR > 5,000 mcf DATE TIME VOLUME DESCRIPTION OF INCIDENT & CAUSE ACTION TAKEN TO ELIMINATE CAUSE 10/24/2015 1243-2100 1,000 See attachments See attachments TOTAL 1,000 11/16/2015 3:35 PM BP EXPLORATION (ALASKA) INC. PRUDHOE BAY UNIT - CENTRAL GAS FACILITY GAS FLARING INCIDENT REPORT October 2015 TOTAL Unplanned Events < 1 Hour 249 Unplanned Events> 1 Hour 390 Planned Events < 1 hour and not 2,902 exceeding 5,000 MCF Planned Events> 1 hour or 1,000 exceeding 5,000 MCF Pilot Purge 21,828 Assist 44,560 TOTAL FLARED VOLUME 70,929 Page 4 11/16/2015 3 35 PM FlareStartDate 10/01/2015 Flare End Date 10/312015 CGF Flare Report Total Volume (MSCF) 4541 Report Numbe System Date StartTime Stop Time Duration Intermittent Black Smoke Planned Reported By Volume 15-332 Controlled Blowdown 10/09/2015 4:30:00 am 4:45:00 am 15 min No No Yes BP1\PAGED2 430 Determination Cause Shut down Tandem 1886 for fall water wash and Oasis testing Action Taken Compressor depressured and flare valve closed Daily Volume (MSCF) 430 15-333 Controlled Blowdown 10/11/2015 1:30:00 am 1:45:00 am 15 min No No Yes BP1\PAGED2 430 Determination Cause Shutdown Tandem 1885 for fall water wash Action Taken 1885 compressor depressure complete and flare valve closed Daily Volume (MSCF) 430 15-347 Controlled Blowdcwn 10/20/2015 2:55:00 pm 3:01:00 pm 6 min No No Yes BPt\CRAMBL 387 Determination Cause 1805 BESD'ed for maintenance Action Taken depressured 15-347 Controlled Blowdown 10/202015 4:40:00 pm 5:02:00 pm 22 min No No Yes BP1\CRAMBL 328 Determination Cause 1855 s/d and depressurized to 180. Action Taken depressurized to 180 Daily Volume (MSCF) 734 15-349 Controlled Blowdown 10232015 4:00:00 am 4:14:00 am 14 min No No Yes BPt\NICHC8 387 Determination Cause S/D 1805 for maint Action Taken Flare valves dosed Daily Volume (MSCF) 387 15-353 Controlled Blowdown 10/24/2015 1:53:00 am 2:05:00 am 12 min No No Yes BP1\NICHC8 510 Determination Cause S/D 1801 and 1802 for planned maint Action Taken Hp Flare valve dosed 15-353 Controlled Blowdown 10/242015 12:43:00 pm 9:00:00 pm 497 min No No Yes BP1\NICHC8 1000 Determination Cause Depressurize WOA MI line for Maint. Action Taken Valves dosed to flare header Daily Volume (MSCF) 1510 15-358 Controlled Blowdown 10262015 9:23:00 pm 10:40:00 pm 77 min No No No BP1 WICHC8 390 Determination Cause 1802S/D Action Taken S/D 1801 and flare valves closed Daily Volume(MSCF) 390 15-361 Controlled Blowdown 10/27/2015 12:49:00 pm 1:01:00 pm 12 min No No No BP1\FLOYDDL 195 Determination Cause T/C 1802 Booster 2 Shutdown on Low GG Lube Oil Pressure. Action Taken Booster Compressor Depressurization Complete. Daily Volume (MSCF) 195 15-366 Controlled Blowdown 10/302015 1:48:00 pm 1:58:00 pm 12 min No No Yes BP1\CRAMBL 430 Determination Cause T/C 1884 s/d for planned maintenance Action Taken TIC 1884 depressurization completed. Generated 11/062015 3:25:34PM Page 5 of 12 Flare StartDate 10/01/2015 Flare End Date 10/31/2015 Daily Volume (MSCF) 430 Total Volume (MSCF) 4541 Generated 11/06/2015 3:25:34PM Page 6 of 12 11/20/2015 Gas flaring event at CGF Gas flaring event at CGF AK, OPS PCC EOC TL [AKOPSPCCEOCTL@bp.com] Sent:Monday, November 02, 2015 8:54 PM To: AOGCC Reporting (DOA sponsored) Cc: Loepp, Victoria T (DOA); Benson, Gary A [Gary.Benson@bp.com]; Arthur, Gregory [Gregory.Arthur@bp.com]; AK, HSSEE Env Adv West [AKHSSEEEnvAdvWest@bp.com]; AK, OPS CCP CGF OSM [AKOPSCCPCGFOSM@BP.com]; Fortenberry, Christopher [Christopher.Fortenberry@bp.com]; AK, OPS GC3&PCC OSM [AKOPSGC3PCCOSM@BP.com]; AK, HSSEE Env Adv Central [AKHSSEEEnvAdvCentral@bp.com]; Glover, Robin (SLR) [Robin.Glover@bp.com]; AK, OPS CGF OTL [AKOPSCGFOTL@bp.com] To: AOGCC Reporting Aoacc reportino(a alaska.gov CC: Victoria Leopp, AOGCC victoria.loepi)( alaska.gov From: David Spall, GPB Production Optimization Team Leader A flaring event occurred at CGF starting at 10/24/2015 12:43 and stopping at 10/24/2015 21:00 with a volume of 1000 (MSCF). The event lasted for 497 minutes and was due to depressurizing the WOA MI line for Maint. The event stopped when the Valves closed to flare header A flaring event occurred at CGF starting at 10/26/2015 21:23 and stopping at 10/26/2015 22:40 with a volume of 390 (MSCF). The event lasted for 77 minutes and was due to 1802 S/D. The event stopped when S/D 1801 and flare valves closed Thanks, David Spall (Alternate—Jennifer Blake) PCC/EOC Production Optimization Team Lead 907-659-4472 Office 219-689-4036 Cell david.spall(dDbo.com https:/hvebm ai la.alaska.gov/mat?ae=Item &t=IPM.Note&id= RgAAAABKLne2zgP4SoM kep0hCxbSBwBUvQ964rjQTgYgn3632GdIAAAA.hhLyAABUvQ964rj QT... 1/1 STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMMISSION FACILITY REPORT OF PRODUCED GAS DISPOSITION 1. Facility Number 0290000008 2. Facility Name PBU CGF B 3. Field PBU - EOA 4. Operator BP 5. MonthNear of Disposition I November -2015 Disposition Volume MCF 20. Forproduction from multiple pools, list contribution of each pool as a percent of Total Volume. 6. Sold 1,544,966 Pool Name Pool Code Percent 7. Reinjected 4,039,619 PRUDHOE 640150 100.00% 8. Flared or vented 1 hour or less 4,159 9. Flared or vented more than 1 hour (see instr.) 0 10. Pilot and Purge 21,876 11. Assist Gas 46,896 12. Fuel gas used in lease operations. 2,905,896 13. Other (see instructions) 0 Official Use Only Authorization >1 hr: Safety MCF 14. TOTAL VOLUME (ITEMS 6-12) 8,563,412 Lease Use MCF 15. NGL Gas Equivalent 1,544,966 Conservation MCF 16. Purchased gas 0 Waste: MCF 17. Transferred from: FS1, FS2, FS3, GCT, GC2 & GC3 230,503,033 18. Transferred to: (Express as a negative #) FS1, FS2, FS3, CCP & GPMA -221,939,621 Commissioner Date 19. Remarks: Block 6: Gas equivalent of NGLs; Block 18: Includes MI Gas to Pt. McIntyre = 1,472,566 mscf I hereby certify that the foregoing is true and correct to the best of my knowledge. Note: All volumes must be corrected Signature y /i �� Title Manager Production Taxes and Royalties Alaska to pressure of 14.65 psis and to a temperature of 60o F. Authority 20 Printed Name Diane Colley Phone (907) 564-5775 Date /014-K AAC25.235. Form 10-422 Rev. 5/2009 INSTRUCTIONS ON REVERSE SIDE Submit in Duplicate BP EXPLORATION (ALASKA) INC. PRUDHOE BAY UNIT - CENTRAL GAS FACILITY GAS FLARING INCIDENT REPORT November 2015 11/12/2015 1019-1055 51 Not required for unplanned events <= 1 hr 11/17/2015 0507-0516 104 11/28/2015 1132-1143 185 11/28/2015 1358-1401 80 TOTAL 420 Not required for unplanned events <= 1 hr See attachments See attachments TOTAL 0 Planned Events Less Than or Equal 1 Hour AND <= 5,000 mcf DATE TIME VOLUME DESCRIPTION OF INCIDENT & CAUSE ACTION TAKEN TO ELIMINATE CAUSE 11/1/2015 1636-1717 2,922 See attachments See attachments 11/14/2015 1725-1731 387 11/23/2015 0929-0940 430 TOTAL 3,739 Planned Events Exceeding 1 Hour OR > 5.000 mcf TOTAL Unplanned Events < 1 Hour Unplanned Events> 1 Hour Planned Events < 1 hour and not exceeding 5,000 MCF Planned Events> 1 hour or exceeding 5,000 MCF Pilot Purge Assist TOTAL FLARED VOLUME 0 TOTAL 420 0 3,739 0 21,876 46,896 72,931 See attachments See attachments Page 2 12/15/2015 952 AM Flare StartDate 11/01/2015 Flare End Date 11/30/2015 CGF Flare Report Total Volume (MSCF) 4159 Report Numbs System Date StartTime Stop Time Duration Intermittent Black Smoke Planned Reported By Volume 15-371 Flare Relief 11/01/2015 4:36:00 pm 5:17:00 pm 41 min No No Yes BP1\CRAMBL 2922 Determination Cause Flaring occuned while 01132031C open to light Bare pilot Action Taken Pilot was light and 01 P2031C was closed. Daily Volume (MSCF) 2922 15-381 Flare Relief 11/14/2015 5:25:00 pm 5:31:00 pm 6 min No Determination Cause T/C 1855 Shutdown for planned Maintenance. Action Taken Depressurization Complete. 15-385 Flare Relief 11/23/2015 9:29:00 am 9:40:00 am 11 min No Determination Cause Tandem3 T/C 1885 Shutdown and BESD. For Maintenance Action Taken Depressurization Complete. Generated 12/03/2015 4:18:41PM No Yes BPI\FLOYDDL 387 Daily Volume (MSCF) 387 No Yes BPi\FLOYDDL 430 Daily Volume (MSCF) 430 Total Volume (MSCF) 4159 Page 2 of 7 STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMMISSION FACILITY REPORT OF PRODUCED GAS DISPOSITION 1. Facility Number 0290000008 2. Facility Name PBU CGF B 3. Field PBU - EOA 4. Operator BP 5. Monthlyear of Disposition December -2015 Disposition Volume MCF 20. Forproduction from multiple pools, list contribution of each pool as a percent of Total volume. 6. Sold 1,416,404 Pool Name Pool Code Percent 7. Reinjected 3,691,646 PRUDHOE 640150 100.00% 8. Flared or vented 1 hour or less 0 9. Flared or vented more than 1 hour (see insh) 5,067 10. Pilot and Purge 22,600 11. Assist Gas 56,660 12. Fuel gas used in lease operations. 3,134,317 13. Other (see instructions) 0 Official Use Only Authorization >1 hr: Safety / MCF 14. TOTAL VOLUME (ITEMS 6.12) 8,326,694 Lease Use MCF 15. NGL Gas Equivalent 1,416,404 Conservation MCF 16. Purchased gas 0 Waste: MCF 17. Transferred from: FSI, FS2, FS3, GC1, GC2 & GC3 242,944,135 `fit, Commissioner Date 18. Transferred to: (Express as a negative #) FS1, FS2, FS3, CCP & GPMA -234,617,440 19. Remarks: Black 6: Gas equivalent of NGLs; Block 18: Includes MI Gas to Pt. McIntyre = 1,988,301 mscf I hereby certify that the foregoing is true and correct to the best of my knowledge. /n� /�, I/� Signature `J a LC �(,tC�.4 Title Mana er Production Taxes and Ro alties Alaska I Printed Name Diane Colle Phone (907) 564-5775 Date / / r Note: All volumes must be corrected to pressure of 14.65 psis and to a temperature of 60o F. Authority 20 AAC25.235. V/%1-- Z//C/ 6b Form 10-422 Rev. 5/2009 INSTRUCTIONS ON REVERSE SIDE Submit in Duplicate BP EXPLORATION (ALASKA) INC. PRUDHOE BAY UNIT - CENTRAL GAS FACILITY GAS FLARING INCIDENT REPORT December 2015 Not required for unplanned events <= 1 hr TOTAL 0 DESCRIPTION OF IN See attachments TOTAL 0 Not required for unplanned events <= 1 hr See attachments Planned Events Less Than or Equal 1 Hour AND <= 5,000 mct DATE TIME VOLUME DESCRIPTION OF INCIDENT & CAUSE ACTION TAKEN TO ELIMINATE CAUSE See attachments See attachments TOTAL 0 Planned Events Exceeding 1 Hour OR > 5,000 mcf DATE TIME VOLUME DESCRIPTION OF INCIDENT & CAUSE ACTION TAKEN TO ELIMINATE CAUSE 12/19/2015 0200-1400 4,040 See attachments See attachments 12/27/2015 0900-1115 1,027 TOTAL 5,067 TOTAL Unplanned Events < 1 Hour 0 Unplanned Events > 1 Hour 0 Planned Events < 1 hour and not 0 exceeding 5,000 MCF Planned Events> 1 hour or exceeding 5,000 MCF Pilot Purge Assist TOTAL FLARED VOLUME 5,067 22,600 56,660 84,327 Page 2 1/14/2016 4:19 PM FlareStartDate 12/01/2015 Flare End Date 12/31/2015 CGF Flare Report Total Volume (MSCF) 5067 Report Numbs System Date Start Time Stop Time Duration Intermittent Black Smoke Planned Reported By Volume 15-410 Controlled Blowdown 12/19/2015 2:00:00 am 2:00:00 pm 720 min No No Yes BP1\NICHC8 4040 Determination Cause Depressurize LTS-3 for MEOH quill installation Action Taken Flare valve closed after zero energy 15-416 Controlled Slowdown 12127/2015 9:00:00 am 11:15:00 am 135 min No No Yes BP1\DENNSO 1027 Determination Cause Depressured MI EOA header to 15001Ps for line lifts and line inspection at drill site 13 Action Taken Stopped depressunng once line was down to 1500 Ws. Total Volume (MSCF) 5067 Generated 01/08/2016 11:15:02AM Page 2 of 7 12/30/2015 Gas flaring event at CGF Gas flaring event at CGF AK, OPS PCC EOC TL [AKOPSPCCEOCTL@bp.com] Sent:Tuesday, December 29, 2015 10:06 AM To: AOGCC Reporting (DOA sponsored) Cc: Loepp, Victoria T (DOA); Benson, Gary A [Gary.Benson@bp.com]; Arthur, Gregory [Gregory.Arthur@bp.com]; AK, OPS CCP CGF OSM [AKOPSCCPCGFOSM@BP.com]; Fortenberry, Christopher [Christopher.Fortenberry@bp.com]; AK, OPS GC3&PCC OSM [AKOPSGC3PCCOSM@BP.com]; AK, HSSEE Env Adv Central [AKHSSEEEnvAdvCentral@bp.com]; Glover, Robin (SLR) [Robin.Glover@bp.com]; AK, OPS CGF OTL [AKOPSCGFOTL@bp.com]; Kain, Rachel B [Rachel.Kain@bp.com] To: AOGCC Reporting Aoacc.reportinaCa alaska.gov CC: Victoria Leopp, AOGCC victoria.loepp@alaska. gov From: David Spall, GPB Production Optimization Team Leader A flaring event occurred at CGF starting at 12/27/2015 09:00 and stopping at 12/27/2015 11:15 with a volume of 1 (MSCF). The event lasted for 135 minutes and was due to De -pressuring MI EOA header to 1500#'s for line lifts and line inspection at drill site 13. The event stopped when de -pressuring once line was down to 1500 #'s Thanks, David Spall (Alternate—Jennifer Blake) PCC/EOC Production Optimization Team Lead 907-659-4472 Office 219-689-4036 Cell david.spallClbo.com https:dwebmai la.alaska.gov/owa/?ae=ltem&t= IPM.N ote&id= RgAAAABKLne2zgP4SoM kepOhCxtSBwBUvQ964rj QTgYgn3632GdIAAAAhhLyAASUvQ964rjQT... 1/1 12/30/2015 Gas Flaring event at CGF Gas flaring event at CGF AK, OPS PCC EOC TL [AKOPSPCCEOCTL@bp.com] Sent:Sunday, December 27, 2015 12:25 PM To: AOGCC Reporting (DOA sponsored) Cc: Loepp, Victoria T (DOA); Benson, Gary A [Gary.Benson@bp.com]; Arthur, Gregory [Gregory.Arthur@bp.com]; AK, OPS CCP CGF OSM [AKOPSCCPCGFOSM@BP.com]; Fortenberry, Christopher [Christopher.Fortenberry@bp.com]; AK, OPS GC3&PCC OSM [AKOPSGC3PCCOSM@BP.com]; AK, HSSEE Env Adv Central [AKHSSEEEnvAdvCentral@bp.com]; Glover, Robin (SLR) [Robin.Glover@bp.com]; AK, OPS CGF OTL [AKOPSCGFOTL@bp.com]; Kain, Rachel B [Rachel.Kain@bp.com] To: AOGCC Reporting Aogcc. reoortinaCcilalaska.gov CC: Victoria Leopp, AOGCC victoria.loepp analaska.gov From: David Spall, GPB Production Optimization Team Leader A flaring event occurred at CGF starting at 12/19/2015 02:00 and stopping at 12/19/2015 14:00 with a volume of 4040 (MSCF). The event lasted for 720 minutes and was due to depressurizing LTS-3 for planned MEOH quill installation. The event stopped when the Flare valve closed after zero energy, when de -pressuring was complete. Thanks, David Spall (Alternate—Jennifer Blake) PCC/EOC Production Optimization Team Lead 907-659-4472 Office 219-689-4036 Cell dayid.spall CoDbp.COm https:/&vebmaila.alaska.gov/mat?ae Item&t=IPM.Note&id=RgAAAABKLne2zgP4SoMkepOhCxbSBwBUvQ964rjQTgYgn3632GdIAAAAhhLyAABUvQ964rjQT... 1/1 1/19/2016 CORRECTION: Gas flaring event at CGF Reply Reply All Forward CORRECTION: Gas flaring event at CGF AK, OPS PCC EOC TL [AKOPSPCCEOCTL@bp.com] To: AOGCC Reporting (DOA sponsored) Cc: Loepp, Victoria T (DOA); Benson, Gary A [Gary.Benson@bp.com]; Arthur, Gregory [Gregory.Arthur@bp.com]; AK, OPS CCP CGF OSM [AKOPSCCPCGFOSM@BP.com]; Fortenberry, Christopher [Christopher. Fortenberry@bp.com]; To: AOGCC Reporting CC: Victoria Leopp, AOGCC Aogcc.reoorting@alaska.aov victoria.loepp@alaska.00v From: Jennifer Blake, GPB Production Optimization Team Leader Correction to the CGF flaring event on 12/27: A flaring event occurred at CGF starting at 12/27/2015 09:00 and stopping at 12/27/2015 11:15 with a volume of 1027 (MSCF). The event lasted for 135 minutes and was due to De -pressuring MI EOA header to 1500#'s for line lifts and line inspection at drill site 13. The event stopped when de -pressuring once line was down to 1500 #'s. Thanks, Jennifer Blake PCC/EOC Production Optimization Team Lead (alt David Spall) Office (907) 659-4472 Cell (907) 830-6204 Jennifer. blakePbo.COm From: AK, OPS PCC EOC TL Sent: Tuesday, December 29, 2015 10:06 AM To: 'aogcc.reporting@alaska.gov' Cc: 'Loepp, Victoria T (DOA) (victoria.loepp@alaska.gov)'; Benson, Gary A; Arthur, Gregory; AK, OPS CCP CGF OSM; Fortenberry, Christopher; AK, OPS GC3&PCC OSM; AK, HSSEE Env Adv Central; Glover, Robin (SLR); AK, OPS CGF OTL; Kain, Rachel B Subject: Gas flaring event at CGF To: AOGCC Reporting Aoacc. reoortina@alaska.aov CC: Victoria Leopp, AOGCC victoria.loeoo al ..alaska.aov From: David Spall, GPB Production Optimization Team Leader A flaring event occurred at CGF starting at 12/27/2015 09:00 and stopping at 12/27/2015 11:15 with a volume of 1 (MSCF). The event lasted for 135 minutes and was due to De -pressuring MI EOA header to 1500#'s for line lifts and line inspection at drill site 13. The event stopped when de -pressuring once line was down to 1500 #'s Thanks, n ... :J C-11 /A1 -..-....s.. https:ilwebmaila.alaska.gov/awat?ae=Item&a=Open&t=IPM.Note&id=RgAAAABKLne27gP4SoMkepOhCxbSBwBUvQ964rjQTgYgn3632GdIAAAAhhLyAA6 v 1/1