Facility: PBU FS 1
Operator: BP EXPLORATION (ALASKA) INC.
STATE OF ALASKA
ALASKA OIL AND GAS CONSERVATION COMMISSION
FACILITY REPORT OF PRODUCED GAS DISPOSITION
RECEIVED
FEB 19 2015
AOGCC
I. Facility Number
0290000028
2. Facility Name
PBU FS 1
3. Field
PBU - EOA
4. Operator
BP
5. MonthNear of Disposition
I January -2015
Disposition
Volume MCF
20. For production from multiple pools, list contribution of each pool as a percent of
Total Volume.
6. Sold
0
Pool Name Pool Code Percent
7. Reinjected
O
PRUDHOE 640150 100.00%
8. Flared or vented 1 hour or less
0
9. Flared or vented more than 1 hour (see instr.)
0
10. Pilot and Purge
25,578
11. Assist Gas
16,934
12. Fuel gas used in lease operations.
691,443
13. Other (see instructions)
0
Official Use Only
Authorization >7 hr:
Safety
MCF
14. TOTAL VOLUME (ITEMS 6.12)
733,955
Lease Use
MCF
15. NGL Gas Equivalent
0
Conservation
MCF
16. Purchased gas
0
Waste:
MCF
17. Transferred from: CGF
182,092
Commissioner Date
18. Transferred to: (Express as a negative #) CGF & CCP
-79,815,730
19. Remarks:
I hereby certify that the foregoing is truce and correct to the best of my knowledge.
'roM� Note: All volumes must be corrected
/itMn coma,
Signature tf y/ I lV ll Title Mana er Production Taxes and Ro alties Alaska to pressure of 14.65 psis and to a
12 i� temperature of 60o F. Authority 20
Printed Name Diane Colley Phone (907) 564-5775 Date A,,,J 6 AAC25.235.
Form 10-422 Rev. 5/2009 INSTRUCTIONS ON REVERSE SIDE Submit in Duplicate
STATE OF ALASKA
ALASKA OIL AND GAS CONSERVATION COMMISSION
FACILITY REPORT OF PRODUCED GAS DISPOSITION
1. Facility Number
0290000028
2. Facility Name
PBU FS 1
3. Field
PBU - EOA
4. Operator
BP
5. MonthNear of Disposition
I February -2015
Disposition
Volume MCF
20. For production from multiple pools, list contribution of each pool as a percent of
Total Volume.
6. Sold
Pool Name Pool Code Percent
7. Reinjected
O
PRUDHOE 640150 100.00%
B. Flared or vented l hour or less
105
9. Flared or vented more than 1 hour (see inslr.)
0
10. Pilot and Purge
23,338
11. Assist Gas
14,474
12. Fuel gas used in lease operations.
598,148
13. Other (see instructions)
0
Official Use Only
Authorization >t hr:
Safety
MCF
14. TOTAL VOLUME (ITEMS 6.12)
636,065
Lease Use
MCF
15. NGL Gas Equivalent
U
Conservation
MCF
16. Purchased gas
U
Waste:
MCF
17. Transferred from: CGF
165,363
18. Transferred to: (Express as a negative # CGF & CCP
( p a9 )
-69,721,396
Commissioner Date
19. Remarks:
I hereby certify tha he foregoing is true and correct to the best of my knowledge.
Note: All volumes must be corrected
Signature Title Manager Production Taxes and Royalties Alaska to pressure of 14.65 psia and to a
temperature of 60o F. Authority 20
Printed Name Diane Colley Phone (907) 564-5775 Date L AAC25.235.
Form 10-422 Rev. 5/2009 INSTRUCTIONS ON REVERSE SIDE Submit in Duplicate
STATE OF ALASKA
ALASKA OIL AND GAS CONSERVATION COMMISSION
FACILITY REPORT OF PRODUCED GAS DiSPnSiTinN
1. Facility Number
0290000028
2. Facility Name
PBU FS 1
3. Field
PBU - EOA
4. Operator
BP
5. MonthNear of Disposition
March -2015
Disposition
Volume MCF
20. For production from multiple pools, list contribution of each pool as a percent of
Total Volume.
6. Sold
O
Pool Name PoolCode Percent
7. Reinjected
0
PRUDHOE 640150 100.00%
8. Flared or vented 1 hour or less
264
9. Flared or vented more than 1 hour (see instr.)
504
10. Pilot and Purge
25,957
11. Assist Gas
34,187
12. Fuel gas used in lease operations.
679,850
13. Other (see instructions)
0
Official Use Only
Authorization>1 hr:
Safety
��
MCF
14. TOTAL VOLUME (ITEMS 6-12)
740,762
Lease Use
MCF
15. NGL Gas Equivalent
0
Conservation
MCF
16. Purchased gas
0
Waste:
MCF
17. Transferred from: CGF
188,907
^
18. Transferred to: (Express as a negative #) CGF & CCP
-78,237,688
Commissioner Date
19. Remarks:
I hereby certify that the foregoing is true and correct to the best of my knowledge.
� Note: All volumes must be corrected
Signature r % / zr� Title Manager Production Taxes and Royalties Alaska to pressure of 14.65 psia and to a
temperature of 60o F. Authority 20
Printed Name Diane Colley Phone (907) 564-5775 Date AAC25.235.
Form 10-422 Rev. 5/2009 INSTRUCTIONS ON REVERSE SIDE Submit in Duplicate
3/9/2015
BP EXPLORATION (ALASKA) INC.
PRUDHOE BAY UNIT- FS -1
GAS FLARING INCIDENT REPORT
March 2015
1112-1150 264 Not required for unplanned events <= 1 hr
TOTAL 264
Not required for unplanned events <=1 hr
-•••- ...w,x,c vcacmruununrvuuenn&wuae ACTION TAKEN TO ELIMINATE CAUSE
3/6/2015 1524-1630 504 See attachments See attachments
TOTAL 504
Planned Events Less Than or Equal 1 Hour AND <= 5,000 mcf
DATE TIME VOLUME DESCRIPTION OF INCIDENT & CAUSE ACTION. TAKEN TO ELIMINATE CAUSE
See attachments See attachments
DATE
TOTAL
TOTAL
A
See attachments
0
ACTION TAKEN TO E
See attachments
Page 3
4/11/2015
4:06 PM
TOTAL
Unplanned Events < 1 Hour
264
Unplanned Events> 1 Hour
504
Planned Events < 1 hour and not
0
exceeding 5,000 MCF
Planned Events> 1 hour or
0
exceeding 5,000 MCF
Pilot Purge
25,957
Assist
34,187
TOTAL FLARED VOLUME
60,912
ACTION TAKEN TO E
See attachments
Page 3
4/11/2015
4:06 PM
Flare Start Date 03/01/2015
Flare End Date 0 3/3112 01 5
FSS Flare Report Total Volume (MSCF) 768
Report
Numbe System Date Start Time Stop Time Duration Intermittent Black Smoke Planned Reported By Volume
15-57 Flare Relief 03/06/2015 3:24:00 pm 4:30:00 pm 66 min No No No BP1WLLZO 504
Determination Cause STV -IP TC 1825 shutdown due to amp overload from NGLs
Action Taken Loaded STV/IP T/C,
Daily Volume (MSCF) 504
Total Volume (MSCF) 768
Generated 04/03/2015 3:26:36PM Page 3 of 8
Hunt, Jennifer L (DOA)
From:
AK, OPS PCC EOC TL <AKOPSPCCEOCTL@bp.com>
Sent:
Monday, March 09, 2015 1:21 PM
To:
Hunt, Jennifer L (DOA)
Cc:
Loepp, Victoria T (DOA); Roby, David S (DOA); Castano, Alejandra; Benson, Gary A;
Arthur, Gregory; AK, HSSEE Env Adv West; Loader, Neil; AK, OPS GC3&PCC OSM; AK,
HSSEE Env Adv East; AK, OPS FSI OSM; AK, OPS FS1 Facility OTL
Subject:
Flaring Event at:1010
To: Jennifer Hunt, AOGCC CC: Dave Roby, AOGCC CC: Victoria Ferguson,
AOGCC
iennifer.hunt(a)alaska.gov dave.robv(o)alaska.gov victoria.ferouson(ftlaska.g
ov
From: Jennifer Blake, GPB Production Optimization Team Leader
A flaring event occurred at FS1 starting at 03/06/2015 15:24 and stopping at 03/06/2015 16:30 with a volume of 504
(MSCF). The event lasted for 66 minutes and was due to the STV/IP compressor 1825 shutdown, due to amp overload
from NGLs. Flaring stopped when the turbine compressor was started up and reloaded.
Please let me know if you have any questions.
Thanks,
Jennifer Blake
PCC/ECC Production Optimization Team Lead
Office (907) 659-4472
Cell (907) 830-6204
Jennifer.blake@bp.com
Hunt, Jennifer L (DOA)
From: AK, OPS PCC EOC TL <AKOPSPCCEOCTL@bp.com>
Sent: Tuesday, March 24, 2015 10:32 AM
To: Hunt, Jennifer L (DOA)
Cc: Loepp, Victoria T (DOA); Castano, Alejandra; Benson, Gary A; Arthur, Gregory; AK, HSSEE
Env Adv East; Loader, Neil; AK, OPS GPMA Facility OTL; AK, OPS GPMA OSM; AK, HSSEE
Env Adv West; AK, OPS GC3&PCC OSM
Subject: RE: Gas flaring events at FSI, FS2, GC3
To: Jennifer Hunt, AOGCC CC: Victoria Ferguson, AOGCC
iennifer.hunt(a)alaska.gov victoria.ferguson(c)alaska.gov
From: Jennifer Blake, GPB Production Optimization Team Leader
A flaring event occurred at LPC starting at 03/22/2015 09:47 and stopping at 03/22/2015 10:20 with a volume of 642
(MSCF). The event was a black smoke event and was due to a blown fuse sending the STV/IP compressor, Crude Oil
Surge Drum, STV Suction scrubber, IP Suction scrubber and CHID into a Blowdown Emergency Shutdown (BESD). The
event stopped when the fuse was replaced, valves went to their normal position and 1801 was restarted.
Please let me know if you have any questions.
Thanks,
Jennifer Blake
PCC/EOC Production Optimization Team Lead
Office (907) 659-4472
Cell (907) 830-6204
Jennifer.blake@bp.com
RECEIVED
STATE OF ALASKA
ALASKA OIL AND GAS CONSERVATION COMMISSION
FACILITY REPORT OF PRODUCED GAS DISPOSITION
MAY 14 2015
A®GCC
1. Facility Number
0290000028
2. Facility Name
PBU FS 1
3. Field
PBU - EOA
4. Operator
BP
5. Month/Year of Disposition
April -2015
Disposition
Volume MCF
20. For production from multiple pools, list contribution of each pool as a percent of
Total Volume.
6. Sold
U
Pool Name Pool Code Percent
7. Reinjected
O
PRUDHOE 640150 100.00%
8. Flared or vented 1 hour or less
0
9. Flared or vented more than 1 hour (see instr.)
0
10. Pilot and Purge
25,073
11. Assist Gas
37,442
12. Fuel gas used in lease operations.
645,643
13. Other (see instructions)
0
Official Use Only
Authorization >t hr:
Safety
MCF
14. TOTAL VOLUME (ITEMS 6-12)
708,158
Lease Use
MCF
15. NGL Gas Equivalent
0
Conservation
MCF
16. Purchased gas
0
Waste:
MCF
17. Transferred from: CGF
171,194
18. Transferred to: (Express as a negative #) CGF 8 CCP
-71,581,167
Commissioner Date
19. Remarks:
I hereby certify that the foregoing is true and correct to the best of my knowledge.
�n v�� n , Note: All volumes must be corrected
Signature ll,,yy�t �t tGVI Title Manager Production Taxes anl Ro pities Alaska to pressure of 14.65 psis and to a
j temperature of 60o F. Authority 20
Printed Name Diane ColleyPhone (907) 564-5775 Date � AAC25.235.
Form 10-422 Rev. 5/2009 INSTRUCTIONS ON REVERSE SIDE Submit in Duplicate
STATE OF ALASKA
ALASKA OIL AND GAS CONSERVATION COMMISSION
FACILITY REPORT OF PRODUCED GAS DISPOSITION
RECEIVED
JUN 16 2015
AOGCC
1. Facility Number
0290000028
2. Facility Name
PBU FS 1
3. Field
PBU - EOA
4. Operator
BP
5. Month fyear of Disposition
Ma -2015
Disposition
Volume MCF
20. For production from multiple p0015, list contribution of each pool as a percent of
Total Volume.
6. Sold
0
Pool Name Pool Code Percent
7. Reinjected
0
PRUDHOE 640150 100.00%
8. Flared or vented 1 hour or less
453
9. Flared or vented more than 1 hour (see instr.)
2,240
10. Pilot and Purge
25,742
11. Assist Gas
37,914
12. Fuel gas used in lease operations.
558,868
13. Other (see instructions)
0
Official Use Only
Authorization >7 hr.
Safety
Z Z �D
MCF
14. TOTAL VOLUME (ITEMS 6-12)
625,217
Lease Use
MCF
15. NGL Gas Equivalent
0
Conservation
MCF
16. Purchased gas
0
Waste:
MCF
17. Transferred from: CGF
159,275,
n
/
18. Transferred to: (Express as a negative #) CGF & CCP
-63,909,049
Commissioner Date
19. Remarks:
I hereby certify that the foregoing is true and correct to the best of my knov4edge.
& 0� Note: All volumes must corrected
Signature.(� Title Maria er Production Taxes and Ro allies Alaska to pressure of 14.65 psis ia and to a
i temperature of 60o F. Authority 20
Printed Name Diane ColleyPhone (907) 564-5775 Date 7 / AAC25.235.
Form 10-422 Rev. 5/2009 INSTRUCTIONS ON REVERSE SIDE Submit in Duplicate
BP EXPLORATION (ALASKA) INC.
PRUDHOE BAY UNIT- FS -1
GAS FLARING INCIDENT REPORT
May 2015
RECEIVED
JUN 16 2015
-ACGCC
unplanned Events less than or equal to 1 hour
DATE TIME VOLUME DESCRIPTION OF INCIDENT & CAUSE ACTION TAKEN TO ELIMINATE CAUSE
5/30/2015 1015-1030 83 Not required for unplanned events <= 1 hr Not required for unplanned events <= 1 hr
5/30/2015 1055-1140 250
TOTAL 333
See attachments
See attachments
TOTAL 0
Planned Events Less Than or Equal 1 Hour AND <= 5,000 mcf
DATE TIME VOLUME DESCRIPTION OF INCIDENT & CAUSE ACTION TAKEN TO ELIMINATE CAUSE
5/5/2015 0030-0035 60 See attachments See attachments
5/6/2015 1850-1855 60
TOTAL 120
5/5/2015 1245-1515
1,120 See attachments
5/6/2015 2035-2305
1,120
TOTAL
2,240
TOTAL
Unplanned Events < 1 Hour
333
Unplanned Events> 1 Hour
0
Planned Events < 1 hour and not
120
exceeding 5,000 MCF
Planned Events > 1 hour or
exceeding 5,000 MCF
Pilot Purge
Assist
TOTAL FLARED VOLUME
2,240
25,742
37,914
66,349
See attachments
CAUSE
Page 5
6/12/2015
10:03 AM
Flare StartDate 05/01/2015
Flare End Date 05/31/2015
FS1 Flare Report Total Volume (MSCF) 2693
Report
Numbe System Date Start Time Stop Time Duration Intermittent Black Smoke Planned Reported By Volume
15-128 Controlled Blowdown 05/05/2015 12:30:00 am 1235:00 am 5 min No
Determination Cause
T\C 1803depressuredfor water wash. Black smoke for 10 seconds
Action Taken
Completed shutdown,
15-128 Controlled Blowdown 05/05/2015 12:45:00 am 3:15:00 am 150 min No
f
Determination Cause
T\C 1803 spin cooling
Action Taken
Completed spin cooling.
15-131 Controlled Blowdown 05/06/2015 6:50:00 pm 6:55:00 pm 5 min No
Determination Cause
T\C 1804 depressured for water wash
Action Taken
Completed shutdown.
15-131 Controlled Blowdown 05/06/2015 8:35:00 pm 11:05:00 pm 150 min No
Y
Determination Cause T\C 1804 spin cooling
Action Taken Completed spin cooling.
Yes Yes BP1\THORSOJ
60
No Yes BP1\THORSOJ
1120
Daily Volume (MSCF)
1180
No Yes BPI\THORSOJ
60
No Yes BP11THORSOJ 112C
Daily Volume (MSCF) 1180
Total Volume (MSCF) 2693
RECEIVED,
JUN 16 2015
AOGCCi
Generated 06/08/2015 8:63:39AM Page 4 of 10
STATE OF ALASKA
ALASKA OIL AND GAS CONSERVATION COMMISSION
FACILITY REPORT OF PRODUCED GAS DISPOSITION
1. Facility Number
0290000028
2. Facility Name
PBU FS 1
3. Field
PBU - EOA
4. Operator
BP
5. Month/Year of Disposition
June -2015
Disposition
Volume MCF
20. For production from multiple pools, list contribution of each pool as a percent of
Total Volume.
6. Sold
0
Pool Name Pool Code Percent
7. Reinjected
0
PRUDHOE 640150 100.00%
8. Flared or vented 1 hour or less
16,659
9. Flared or vented more than 1 hour (see instr.)
15,124
10. Pilot and Purge
23,298
11. Assist Gas
40,383
12. Fuel gas used in lease operations.
389,727
13. Other (see instructions)
D
Official Use Only
Authorization >i hr:
Safety
/c/ 2�'
.l
MCF
14. TOTAL VOLUME (ITEMS 6-12)
485,191
Lease Use
MCF
15. NGL Gas Equivalent
0
Conservation
MCF
16. Purchased gas
0
Waste:
MCF
17. Transferred from: CGF
108,026
9.2
Commissioner Date
18. Transferred to: (Express as a negative #) CGF &CCP
-44,806,$02
19. Remarks:
I hereby certify that the foregoing is true and correct to the best of my knowledge.
//l % Note: All volumes must be corrected
Signature tsi�� lC Title Mana er Production Taxes and Ro alties Alaska to pressure of 14.65 psia and to a
temperature of 60o F. Authority 20
Printed Name Diane Coll--,,, Phone (907) 564-5775 Date AAC25.235.
Form 10-422 Rev. 5/2009 INSTRUCTIONS ON REVERSE SIDE Submit in Duplicate
BP EXPLORATION (ALASKA) INC.
PRUDHOE BAY UNIT- FS -1
GAS FLARING INCIDENT REPORT
June 2015
unplanned Events less than or equal to 1 hour
DATE TIME VOLUME DESCRIPTION OF INCIDENT & CAUSE ACTION TAKEN TO ELIMINATE CAUSE
6/11/2015 1800-1845 9,375 Not required for unplanned events <= 1 hr Not required for unplanned events <= 1 hr
6/15/2015 0847-0929 5,833
TOTAL 15,208
Unplanned Events greater than 1 hour
DATE TIME VOLUME DESCRIPTION OF INCIDENT & CAUSE ACTION TAKEN TO ELIMINATE CAUSE
See attachments See attachments
TOTAL 0
Planned Events Less Than or Equal 1 Hour AND <= 5,000 mcf
6/25/2015
1324-1401
176 See attachments
6/27/2015
2310-2355
525
6/28/2015
0015-0019
56
6/28/2015
1036-1055
18
6/30/2015
0820-0846
316
6/30/2015
0849-0920
360
TOTAL
1,451
6/11/2015
1329-1626
860 See attachments
6/14/2015
0928-1041
431
6/24/2015
1536-1647
130
6/26/2015
0030-0200
514
6/26/2015
1231-1334
1,594
6/27/2015
1133-1245
107
6/28/2015
1408-1547
177
6/29-30/2015
2215-0741
11,311
TOTAL
15,124
ACTION TAKEN TO ELIMINATE
See attachments
ACTION TAKEN TO E
See attachments
Page 5
7/15/2015
3:53 PM
BP EXPLORATION (ALASKA( INC.
PRUDHOE BAY UNIT- FS -1
GAS FLARING INCIDENT REPORT
June 2015
Page 6
7/15/2015
3:53 PM
TOTAL
Unplanned Events < 1 Hour
15,208
Unplanned Events> 1 Hour
0
Planned Events < 1 hour and not
1,451
exceeding 5,000 MCF
Planned Events > 1 hour or
15,124
exceeding 5,000 MCF
Pilot Purge
23,298
Assist
40,383
TOTAL FLARED VOLUME
95,464
Page 6
7/15/2015
3:53 PM
ZL LO b abed WdLC:ZS:C SLOZ/ZO/LO Palwau00
papsol PUB Zoe LOl papelS U0481 UOpdV
SdVl 6u!woodn 6uunp SAON 10 asods!P of japio u! Zoe 01 DeLs Ol umopings SZBLOU asnep uolleulW 0I8(3
098 fn0HIVO\Ld9 SEA ON ON u!w LLL wd 009Zb wd 006ZL SLOZ/l l/90 191198 weld Z91,-91,
awnlOA Ae payodaa Pauueld a>towS 310918 lueAluualul uolleina Stull dOIS awll l.LelS alea welsAS agwnN
yodaa
E9LLE (dOSW) ewnloA lelol v0dall awe
Ij TSd
SLoZ/oE/90 OLEO pu3 ajeld
SLOZ/t0/90 ale0 luELS weld
6uunsswdap pala!dwo0 uaHel u0133V
'alnulw
L uegl Seel
10191Owe xOalg 'aVl BOJ C08 0/1 Shc umopingS asneo uopeuittimea
99
Walln9kLd8 SEA
SEA
ON
ulwb
we 00:6Va we OO:SL:ZL 91,0Z/BZ/90 umOPmOI9 Pa11m4uo0 8LZ-SL
ZC9
(dOSW) awnloA Aped
.6uunsswdep palaldwo0 ua\lel uO!3OV
umopings ayl lot ZS(]6uldaamS esne0 uo!Leu!wjala(]
SZS
Walln9\Ld9 sak
ON
ON
u!w Sb
wd00:SS:LL wd00:Ol:ll SLOZ/LZ/90 1allaa weld LLZ-st
6uunsswdep palaldwo0 uallel uopoy
umopings ayl joj SS(]6uldaa&S asne0 uolleulLwelea
LM
Wa11n91Ld9 SEA
ON
ON
u!w ZL
wd 00:9b:ZL we00:C£:LL SLOZ/LZ/90 1a!laa weld LLZ-SL
BOLZ
(dOSW) awn!oA Ape(]
buunssaidap palaldwoo uallel uopoy
umopingsaVlio19LS06wdeemS asneouo!;eulwualaa
b69L
Wal1ne\Ld8 sa),
ON
ON
u!w£9
wd00:bC:L wd00:LE:ZI SLOZ/9Z/90 /91188 weld 92-9L
6uunsswdep palaldwoo uaxel uwlOV
umopingsaVljO1 LS(]6uldaamS asne0 uopewwjalao
bLS
Wa11n8\td9 saA
ON
ON
u!w 06
we 00:00:Z weoOA£:ZL 9LOZ/9Z/90 1allaa weld 9tZ-9L
9Lt
(dOSW) awnlOA AI!e(]
glom HVl xauuV to uo1191dwoo lgun pwnsswdep Auls lllm xeuuV ua4el uopoy
lllom aVl lot xeuuV amsswda(] esne0 uo!Leu!wlalaa
9LL
083n90H\Ld8 sal.
ON
ON
u!w L£
wd00:t0:Z wdoo:tz:L SLOZ/9Z/90 1allaa afield 60Z -9L
OCL
(dOSW) awnloA Apo
3131dWO0 aVl Ipun wnsswd waz le AeLs plm xauue u9jel u0140y
1pom8VljoLwnsswdapxauue eSneOuOpeu!wlalaa
OEL
O63nO0H\Lde sal
ON
ON
ulw LL
wd 00:Lb:b wd00:9C:C SLOZ/bZ/90 1allaa welj e0Z-St
LCB
(ADSW) awnlOA AI!e(]
SZHL0/1 d!/A1S P9Pe01 ua)lel uopoy
SZBLOl oL>loeq dems umopings ZOBL 0U SsneO uopeo!walaa
L£b
fnOHIVO\Ld8 S8,\
ON
ON
u!w£L
we00:1,10:0L we00:8Z:6 91,0Z/bl/90 181108 wel=l 061,-9L
papsol PUB Zoe LOl papelS U0481 UOpdV
SdVl 6u!woodn 6uunp SAON 10 asods!P of japio u! Zoe 01 DeLs Ol umopings SZBLOU asnep uolleulW 0I8(3
098 fn0HIVO\Ld9 SEA ON ON u!w LLL wd 009Zb wd 006ZL SLOZ/l l/90 191198 weld Z91,-91,
awnlOA Ae payodaa Pauueld a>towS 310918 lueAluualul uolleina Stull dOIS awll l.LelS alea welsAS agwnN
yodaa
E9LLE (dOSW) ewnloA lelol v0dall awe
Ij TSd
SLoZ/oE/90 OLEO pu3 ajeld
SLOZ/t0/90 ale0 luELS weld
Flare StartDate 06101/2015
Flare End Date 06/30/2015
15-218 Controlled Blowdown 06/28/2015 10:36:00 am 10 55.00 am 19 min No No
Determination Cause depressureC IP seperator
Action Taken stop depressure of IP seperator
15-218 Controlled Blowdovm 06/28/2015 2:08:00 pm 3:47:00 pm 99 min No No
Determination Cause Depressure Both B and C slugcatchers
Action Taken shut outlet valves to stop depressure
Yes BP1\HOGUERC 18
Yes , BP1UHOGUERC 177
Daily Volume (MSCF) 251
15-222 Controlled Blowdown 06/29/2015 10:15:00 pm 12:00:00 am 105 min No No Yes BP1\NORTMP 3429
Determination Cause Started depressunng A 8 B gas trains (Residue Gas Scrubbers, Contactors, and Glycol Knockout Drums) and associated HP piping in the
plant and leaving the plant, and the 42" Residue Gas line from FS1 to CCP.
Action Taken Continuing to depressure.
Daily Volume (MSCF) 3429
15-223 Controlled Blowdown 06/30/2015 12:0100 am 7.41.00 am 460 min No No Yes BP1\HOGUERC 7882
Determination Cause CONTINUE DEPRESSURE A& B gas trains and associated HP piping in the plant and leaving the plant and 42" Res GAS LINE FROM FS7
TO CCP
Action Taken CLOSED VALVE TO STOP DEPRESSURE 0 PSI
15-223 Controlled Blowdown 06/30/2015 8:20:00 am 8:46:00 am 26 min No No Yes BP7\140GUERC 316
Determination Cause DEPRESSURE C HP SEPERATOR, Gas Scrubber, Scrubber Liquid Pot and associated piping TO FLARE
Action Taken SHUT VALVE TO FLARE AT 0#
15-223 Controlled Blowdown 06/30/2015 8:49:00 am 9:20:00 am 31 min No No Yes BP1\NORTMP 360
Determination Cause Depressure B Train HP Separator, Gas Scrubber, Scrubber Liquid Pot and associated piping
Action Taken Closed valve to flan
Daily Volume (MSCF) 8558
Total Volume (MSCF) 31783
Generated 07/02/2015 3:52:31 PM Page 5 of 12
Hunt, Jennifer L (DOA)
From: AK, OPS PCC EOC TL <AKOPSPCCEOCTL@bp.com>
Sent: Friday, June 12, 2015 1:35 PM
To: Hunt, Jennifer L (DOA)
Cc: Loepp, Victoria T (DOA); Castano, Alejandra; Benson, Gary A; Arthur, Gregory; AK, OPS
GC3&PCC OSM; Borton, Kim; AK, HSSEE Env Adv East; AK, OPS FS1 Facility OTL, AK, OPS
FS1 OSM
Subject: Flaring Event at FSO
To: Jennifer Hunt, AOGCC CC: Victoria Loepp, AOGCC
iennifer.hunt(cDalaska.aov Victoria. loepp(o)alaska.00v
From: David Spall, GPB Production Optimization Team Leader
A flaring event occurred at FS1 starting at 06/11/2015 13:29 and stopping at 06/11/2015 16:26 with a volume of 860
(MSCF). The event lasted for 177 minutes and was due T\C 1825 shutdown to start T\C 1802 in order to dispose of NGL's
during the upcoming TAPS slowdown. The event stopped when T\C 1802 was started and loaded.
A flaring event occurred at FS1 starting at 06/11/2015 18:00 and stopping at 06/11/2015 18:45 with a volume of 9375
(MSCF). The event lasted for 45 minutes and was due T\C 1803 shutdown due to problem associated with vibration. The
event stopped when wells 18-04, 2-34, 5-19, 5-12, 5-23 & 2-12 were shut-in.
Thanks
Dave
David Spall (Alternate —Jennifer Blake)
PCC/EOC Production Optimization Team Lead
907-659-4472 Office
219-689-4036 Cell
david.spall@bp.com
Hunt, Jennifer L (DOA)
From: AK, OPS PCC EOC TL <AKOPSPCCEOCTL@bp.com>
Sent: Monday, June 15, 2015 5:59 PM
To: Hunt, Jennifer L (DOA)
Cc: Loepp, Victoria T (DOA); Castano, Alejandra; Benson, Gary A; Arthur, Gregory; AK, OPS
GC3&PCC OSM; Borton, Kim; AK, HSSEE Env Adv East; AK, OPS FS1 Facility OTL; AK, OPS
FS1 OSM
Subject: Flaring Event at FSI i
To: Jennifer Hunt, AOGCC CC: Victoria Loepp, AOGCC
iennifer.hunt(malaska.00v Victoria. loepp(d>alaska.00v
From: David Spall, GPB Production Optimization Team Leader
A flaring event occurred at FS1 starting at 06/14/2015 09:28 and stopping at 06/14/2015 10:41 with a volume of 431
(MSCF). The event lasted for 73 minutes and was due T\C 1802 shutdown to start T\C 1825 in order to dispose of NGL's
during the upcoming TAPS slowdown. The event stopped when T\C 1825 was loaded.
Thanks
Dave
David Spall (Alternate —Jennifer Blake)
PCC/EOC Production Optimization Team Lead
907-659-4472 Office
219-689-4036 Cell
david.spall@bp.com
Hunt, Jennifer L (DOA)
From: AK, OPS PCC EOC TL <AKOPSPCCEOCTL@bp.com>
Sent: Tuesday, June 16, 2015 8:56 AM
To: Hunt, Jennifer L (DOA)
Cc: Loepp, Victoria T (DOA); Castano, Alejandra; Benson, Gary A; Arthur, Gregory, AK, OPS
GC3&PCC OSM; Borton, Kim; AK, HSSEE Env Adv East; AK, OPS FS1 Facility OTL, AK, OPS
FSI OSM
Subject: Flaring Event a
To: Jennifer Hunt, AOGCC CC: Victoria Loepp, AOGCC
jenn iter. h unt(a,)alaska. gov Victoria. loepp(@alaska.gov
From: David Spall, GPB Production Optimization Team Leader
A flaring event occurred at FS1 starting at 06/15/2015 08:47 and stopping at 06/15/2015 09:29 with a volume of 5833
(MSCF). The event lasted for 42 minutes and was due flare off annex P149 for field pressure relief per EOC. The event
stopped when P149 was closed.
Thanks
Dave
David Spall (Alternate —Jennifer Blake)
PCC/EOC Production Optimization Team Lead
907-659-4472 Office
219-689-4036 Cell
david.spall@bp.com
Hunt, Jennifer L (DOA)
From:
AK, OPS PCC EOC TL <AKOPSPCCEOCTL@bp.com>
Sent:
Friday, June 26, 2015 8:40 AM
To:
Hunt, Jennifer L (DOA)
Cc:
Loepp, Victoria T (DOA); Castano, Alejandra; Benson, Gary A; Arthur, Gregory; AK, OPS
GC3&PCC OSM; Martin, Nelson D; AK, HSSEE Env Adv East; AK, OPS FSI Facility OTL; AK,
OPS FS1 OSM
Subject:
Flaring Event at FS1
To: Jennifer Hunt, AOGCC CC: Victoria Loepp, AOGCC
Wen n ifer. h unt()alaska.gov Victoria. loepp(�Dalaska.gov
From: Jennifer Blake, GPB Production Optimization Team Leader
A flaring event occurred at FS1 starting at 06/24/2015 15:36 and stopping at 06/24/2015 16:47 with a volume of 15
(MSCF). The event lasted for 71 minutes and was due to Annex depressurization for TAR work. The event stopped when
depressurization was completed.
Thanks,
Jennifer Blake
PCG/EOC Production Optimization Team Lead (alt David Spall)
Office (907) 659-4472
Cell (907) 830-6204
Jennifer.blakeC@bp.com
Hunt, Jennifer L (DOA)
From: AK, OPS PCC EOC TL <AKOPSPCCEOCTL@bp.com>
Sent: Monday, June 29, 2015 6:13 AM
To: Hunt, Jennifer L (DOA)
Cc: Loepp, Victoria T (DOA); Castano, Alejandra; Benson, Gary A; Arthur, Gregory, AK, OPS
GC3&PCC OSM; Martin, Nelson D; AK, HSSEE Env Adv East; AK, OPS FS1 Facility OTL; AK,
OPS FS1 OSM
Subject: Flaring Event at FS1
To: Jennifer Hunt, AOGCC CC: Victoria Loepp, AOGCC
iennifer.hunt a alaska.gov Victoria. loepp(dalaska.gov
From: Jennifer Blake, GPB Production Optimization Team Leader
A flaring event occurred at FS1 starting at 06/26/2015 00:30 and stopping at 06/26/2015 02:00 with a volume of 514
(MSCF). The event lasted for 90 minutes and was due to sweeping Drill Site 1 in preparation for TAR shutdown. The
event stopped when depressurization was completed.
A flaring event occurred at FS1 starting at 06/26/2015 12:31 and stopping at 06/26/2015 13:34 with a volume of 1594
(MSCF). The event lasted for 63 minutes and was due to sweeping Drill Site 18 in preparation for TAR shutdown. The
event stopped when depressurization was completed.
A flaring event occurred at FS1 starting at 06/27/2015 11:33 and stopping at 06/27/2015 12:45 with a volume of 107
(MSCF). The event lasted for 72 minutes and was due to sweeping Drill Site 5 in preparation for TAR shutdown. The
event stopped when depressurization was completed.
A flaring event occurred at FS1 starting at 06/28/2015 14:08 and stopping at 06/28/2015 15:47 with a volume of 177
(MSCF). The event lasted for 99 minutes and was due to depressurizing both B and C Slug Catchers. The event stopped
when the outlet valves were shut and depressurizing was complete.
Thanks,
Jennifer Blake
PCC/EOC Production Optimization Team Lead (alt David Spall)
Office (907) 659-4472
Cell (907) 830-6204
Jennifer.blakePbo.com
Hunt, Jennifer L (DOA)
From: AK, OPS PCC EOC TL <AKOPSPCCEOCTL@bp.com>
Sent: Sunday, July 05, 2015 4:58 PM
To: Hunt, Jennifer L (DOA)
Cc: Loepp, Victoria T (DOA); Castano, Alejandra; Benson, Gary A; Arthur, Gregory; AK, OPS
GC3&PCC OSM; Martin, Nelson D; AK, HSSEE Env Adv East; AK, OPS FS1 Facility OTL; AK,
OPS FSI OSM
Subject: Amended: Flaring Event a
To: Jennifer Hunt, AOGCC CC: Victoria Loepp, AOGCC
tennifer.hunt( alaska.gov Victoria. loepp Qalaska.gov
From: David Spall, GPB Production Optimization Team Leader
This report has been amended to show a Flare volume of 130 (MSCF)
Thanks
David Spall (Alternate—Jennifer Blake)
PCC/EOC Production Optimization Team Lead
907-659-4472 Office
219-689-4036 Cell
david.spall@bp.com
From: AK, OPS PCC EOC TL
Sent: Friday, June 26, 2015 8:40 AM
To: 'jennifer.hunt@alaska.gov'
Cc: Loepp, Victoria T (DOA) (victoria.loep)Csbalaska.gov); Castano, Alejandra; Benson, Gary A; Arthur, Gregory; AK, OPS
GC3&PCC OSM; Martin, Nelson D; AK, HSSEE Env Adv East; AK, OPS FSI Facility OTL; AK, OPS FS1 OSM
Subject: Flaring Event at FSI
To: Jennifer Hunt, AOGCC CC: Victoria Loepp, AOGCC
Tenniter.hunt(o)alaska.gov Victoria. loeppt?a.alaska.gov
From: Jennifer Blake, GPB Production Optimization Team Leader
A flaring event occurred at FS1 starting at 06/24/2015 15:36 and stopping at 06/24/2015 16:47 with a volume of 130
(MSCF). The event lasted for 71 minutes and was due to Annex depressurization for TAR work. The event stopped when
depressurization was completed.
Thanks,
Jennifer Blake
PCC/EOC Production Optimization Team Lead (alt David Spall)
Office (907) 659-4472
Cell (907) 830-6204
Hunt, Jennifer L (DOA)
From: AK, OPS PCC EOC TL <AKOPSPCCEOCTL@bp.com>
Sent: Sunday, July 05, 2015 4:58 PM
To: Hunt, Jennifer L (DOA)
Cc: Loepp, Victoria T (DOA); Castano, Alejandra; Benson, Gary A; Arthur, Gregory; AK, OPS
GC3&PCC OSM; Martin, Nelson D; AK, HSSEE Env Adv East, AK, OPS FS1 Facility OTL; AK,
OPS FS1 OSM
Subject: Flaring Event at FS1 R
v
To: Jennifer Hunt, AOGCC CC: Victoria Loepp, AOGCC
4ennifer.hunt cDalaska.gov Victoria. loeppCa)alaska.gov
From: David Spall, GPB Production Optimization Team Leader
A flaring event occurred at FS1 starting at 06/25/2015 13:24 and stopping at 06/25/2015 14:01 with a volume of 176
(MSCF). The event lasted for 37 minutes and was due to De -pressuring the Annex for TAR work. The Annex will stay de -
pressured until completion of the TAR work.
A flaring event occurred at FS1 starting at 06/27/2015 23:10 and stopping at 06/27/2015 23:55 with a volume of 525
(MSCF). The event lasted for 45 minutes and was due to sweeping Drill Site 2 in preparation for TAR shutdown. The
event stopped when depressurization was completed.
A flaring event occurred at FS1 starting at 06/30/2015 08:20 and stopping at 06/30/2015 08:46 with a volume of 316
(MSCF). The event lasted for 26 minutes and was due to de -pressuring C HP Separator, Gas scrubber liquid pot and
associated piping. The event stopped when depressurization was completed.
A flaring event occurred at FS1 starting at 06/30/2015 08:49 and stopping at 06/30/2015 09:20 with a volume of 360
(MSCF). The event lasted for 31 minutes and was due to depressurizing both B train HP Separator, gas scrubber liquid
pot and associated piping. The event stopped when depressurizing was complete.
Thanks,
Dave
David Spall (Alternate —Jennifer Blake)
PCC/EOC Production Optimization Team Lead
907-659-4472 Office
219-689-4036 Cell
david.spall@bp.com
STATE OF ALASKA
ALASKA OIL AND GAS CONSERVATION COMMISSION
FACILITY REPORT OF PRODUCED GAS DISPOSITION
1. Facility Number
0290000028
2. Facility Name
PBU FS 1
3. Field
PBU - EOA
4. Operator
BP
5. MonthNear of Disposition
I July -2015
Disposition
Volume MCF
20. For production from multiple pools, list contribution of each pool as a percent of
Total Volume.
6. Sold
0
Pool Name Pool Code Percent
7. Reinjected
0
PRUDHOE 640150 100.00%
8. Flared or vented l hour or less
3,612
9. Flared or vented more than 1 hour (see instr.)
0
10. Pilot and Purge
5,386
11. Assist Gas
8,086
12. Fuel gas used in lease operations.
44,549
13. Other (see instructions)
0
Official Use Only
Authorization >t hr.
Safety
MCF
14. TOTAL VOLUME (ITEMS 6-12)
61,633
Lease Use
MCF
15. NGL Gas Equivalent
0
Conservation
MCF
16. Purchased gas
0
Waste:
MCF
17. Transferred from: CGF
16,160
Commissioner Date
18. Transferred to: (Express as a negative #) CGF 8 CCP
-2,077,454
19. Remarks:
I hereby certify that the foregoing is true and correct to the best of my knowledge.
Note: All volumes must be corrected
Signature Tire K, l�[K�� Tire Mana er Production Taxes and Royalties Alaska to pressure of 14.65 psis and to a
temperature of 60o F. Authority 20
Printed Name Diane Colley Phone (907) 564-5775 Date AAC25.235.
Form 10-422 Rev. 5/2009 INSTRUCTIONS ON REVERSE SIDE Submit in Duplicate
STATE OF ALASKA
ALASKA OIL AND GAS CONSERVATION COMMISSION
FACILITY REPORT OF PRODUCED GAS DISPOSITION
1. Facility Number
0290000028
2. Facility Name
PBU FS 1
3. Field
PBU - EOA
4. Operator
BP
5. Monthfyear of Disposition
August -2015
Disposition
Volume MCF
20. For production from multiple pools, list contribution of each pool as a percent of
Total Volume.
6. Sold
0
Pool Name Pool Code Percent
7. Reinjected
0
PRUDHOE 640150 100.00%
8. Flared or vented 1 hour or less
13,375
9. Flared or vented more than 1 hour (see instr.)
18,944
10. Pilot and Purge
13,714
11. Assist Gas
22,508
12. Fuel gas used in lease operations.
601,244
13. Other (sea instructions)
0
Official Use Only
Authorization >1 hr:
Safety
9-
� 8 R _4*
MCF
14. TOTAL VOLUME (ITEMS 6-12)
669,785
Lease Use
MCF
15. NGL Gas Equivalent
0
Conservation
MCF
16. Purchased gas
0
Waste:
MCF
17. Transferred from: CGF
162,244
yJn 2-11— /
re
18. Transferred to: (Express as a negative #) CGF &CCP
-60,043,688
Commissioner Date
19. Remarks:
I hereby certify thattheforegoing is true and correct to the best of my knoviledge.
I' /►M f �/�/]n . Note: All volumes must be corrected
Signature d/,{a t U J�/��,(� Title Manager Production Taxes and Ro alties Alaska to pressure of 14.65 psia and to a
temperature of 60o F. Authority 20
Printed Name Diane Q 11 ?y Phone (907) 564-5775 Date AAC25.235.
VTL
Z1,3 11 L
Form 10-422 Rev. 5/2009 INSTRUCTIONS ON REVERSE SIDE Submit in Duplicate
BP EXPLORATION (ALASKA) INC.
PRUDHOE BAY UNIT- FS -1
GAS FLARING INCIDENT REPORT
August 2015
Unplanned Events less than or equal to 1 hour
TOTAL
DATE TIME
VOLUME DESCRIPTION OF INCIDENT & CAUSE
ACTION TAKEN TO ELIMINATE CAUSE
8/7/2015 1317-1405
5,333 Not required for unplanned events <= 1 hr
Not required for unplanned events <= 1 hr
8/25/2015 1229-1234
1,045
Planned Events > 1 hour or
8/26/2015 1230-1310
6,944
TOTAL
13,322
Assist
22,508
TOTAL FLARED VOLUME
68,541
Unplanned Events greater than 1 hour
DATE TIME
VOLUME DESCRIPTION OF INCIDENT & CAUSE
ACTION TAKEN TO ELIMINATE CAUSE
8/25/2015 1450-1654
18,944 See attachments
See attachments
TOTAL
18,944
Planned Events Less Than or Equal 1 Hour AND <= 5,000 mcf
DATE TIME
VOLUME DESCRIPTION OF INCIDENT & CAUSE
ACTION TAKEN TO ELIMINATE CAUSE
8/21/2015 0911-0942
53 See attachments
See attachments
TOTAL
53
See attachments
TOTAL 0
See attachments
Page 5
9/11/2015
10:38 AM
TOTAL
Unplanned Events < 1 Hour
13,322
Unplanned Events> 1 Hour
18,944
Planned Events < 1 hour and not
53
exceeding 5,000 MCF
Planned Events > 1 hour or
0
exceeding 5,000 MCF
Pilot Purge
13,714
Assist
22,508
TOTAL FLARED VOLUME
68,541
See attachments
Page 5
9/11/2015
10:38 AM
Flare Start Date 08/01/2015
Flare End Date 08/31/2015
FSI Flare Report
Total Volume (MSCF) 32319
Report
Numbe System Date StartTime Stop Time Duration Intermittent Black Smoke Planned Reported By Volume
15-273 Flare Relief 08/21/2015 9:11:00 am 9:42:00 am 31 min No No Yes BP1\HOGUERC 53
Determination Cause Depressure 1B c/I to retrieve stuck oosasoo tool
Action Taken shut off flare at 4# switch to tank
Dairy Volume (MSCF) 53
15-280 Flare Relief 08/25/2015 2:50:00 pm 4:54:00 pm 124 min Yes No No BP1\HOGUERC 18944
Determination Cause LPS TIC 1803 shutdown because of a problem associated with 2nd stage nozzle/clevis slop(2%)
Action Taken Shut in wells, 2-8,2-34,2-19,2-21,18-11,2-6,2-28,2-22
Daily Volume (MSCF) 19989
Total Volume (MSCF) 32319
Generated 09/02/2015 9:47:02AM Page 5 of 10
Hunt, Jennifer L (DOA)
From: AK, OPS PCC EOC TL <AKOPSPCCEOCTL@bp.com>
Sent: Sunday, August 09, 2015 12:39 PM
To: Hunt, Jennifer L (DOA)
Cc: Loepp, Victoria T (DOA); Castano, Alejandra; Benson, Gary A; Arthur, Gregory; AK, OPS
GC3&PCC OSM; Martin, Nelson D; AK, HSSEE Env Adv East; AK, OPS FSI Facility OTL; AK,
OPS FS1 OSM
Subject: Flaring Event atud
To: Jennifer Hunt, AOGCC CC: Victoria Loepp, AOGCC
iennifer.huntt7a alaska.00v Victoria. Ioepp(a alaska.aov
From: David Spall, GPB Production Optimization Team Leader
A flaring event occurred at FS1 starting at 08/07/2015 13:17 and stopping at 08/07/2015 14:05 with a volume of 5333
(MSCF). The event lasted for 48 minutes and was due to LPS T\C 1803 shutdown because of a unknown problem. The
Flaring stopped when 1803 T/C was restarted.
Thanks
Dave
David Spall (Alternate —Jennifer Blake)
PCC/EOC Production Optimization Team Lead
907-659-4472 Office
219-689-4036 Cell
david.spall@bp.com
From: AK, OPS PCC EOC TL [mailto:AKOPSPCCEOCTL(&bo com]
Sent: Monday, November 02, 2015 2:55 PM
To: Loepp, Victoria T (DOA)
Subject: RE: PBU Flaring Events
Victoria,
I have added the comments you requested below for each line.
Thank You
David Spall (Alternate — Jennifer Blake)
PCC/EOC Production Optimization Team Lead
907-659-4472 Office
219-689-4036 Cell
david.spall@bo.com
From: Loepp, Victoria T (DOA) fmailto:victoria.loeopCcbalaska oov]
Sent: Wednesday, October 21, 2015 1:58 PM
To: AK, OPS PCC EOC TL
Subject: RE: PBU Flaring Events
See additional events:
From: Loepp, Victoria T (DOA)
Sent: Wednesday, October 21, 2015 1:51 PM
To: AK, OPS PCC EOC TL (AKOPSPCCEOCTLCdbo com)
Subject: PBU Flaring Events
In reference to the following events:
Facility Dates Amt Flared, MSCFD Reason
1. FS -3 5/26-5/28/15 16226 Planned 1802 T/C down, flaring STV
and IP gas Issues with the machine, blew it down, they struggled with several additional restarts
and finally got 1802 to restart.
2. CGF 4/1/15 48066 Unplanned 1805 T/C down, stabilizers
overpressure to flare This was an unplanned issue and they flared to stabilize the plant, they
were able to reload 1805 and get the plant stabilized to stop the flaring.
3. FS -2 4/1-4/5/15 28957 Planned 1801 T/C shutdown for
planned maintenance This was planned maintenance and to keep the plant from going
completely down during the colder temperatures they had to flare
4. FS -1 8/25/15 18944 Unplanned 1803 T/C shutdown, 2nd
stage nozzles There was problem associated with 2"d stage nozzle/clevis slop (2%) they Shut in
wells 2-8, 2-34, 2-19, 2-21, 18-11, 2-6, 2-28, 2-22 to stop the flaring.
5. CGF 8/25/15 35569 Unplanned Flared stabilizer overhead
after TAPS outage, Low rate issues coming out of the TAPS outage, They were able to start the
MI Machine which closed the flare valves.
For each event, explain what happened and what measures were taken to mitigate flaring such as shut
in production. If production was not shut in, why not?
Thanx,
Victoria
Victoria Loepp
Senior Petroleum Engineer
State of Alaska
Oil & Gas Conservation Commission
STATE OF ALASKA
ALASKA OIL AND GAS CONSERVATION COMMISSION
FACILITY REPORT OF PRODUCED GAS DISPOSITION
1. Facility Number 2. Facility Name
0290000028 PBU FS 1
Disposition
3. Field
PBU - EOA
Volume MCF
4. Operator 5. MonthlYear of Disposition
BP September -2015
20. For production from multiple pools, list contribution of each, pool as a percent of
Total Volume.
6. Sold
U
Pool Name Pool Code Percent
7. Reinjected
PRUDHOE 640150 100.00%
8. Flared or vented 1 hour or less
0
9. Flared or vented more than 1 hour (see instr.)
U
10. Pilot and Purge
10,680
11, Assist Gas
26,105
12. Fuel gas used in lease operations.
604,342
13. Other (see instructions)
U
Offloiel Use Only
Authorization>i hr:
Safety
MCF
14. TOTAL VOLUME (ITEMS 6-12)
641,127
Lease Use
MCF
15. NGL Gas Equivalent
0
Conservation
MCF
16. Purchased gas
U
Waste:
MCF
17. Transferred from: CGF
145,941
Commissioner Date
18. Transferred to: (Express as a negative #) CGF & CCP
-72,147,161
19. Remarks.
1 hereby certify that t foregoing is true and correct to the best of my knowledge.
°�I LCNote: All volumes must be corrected
Signature 97 Title Mana er Production Taxes and Royalties Alaska to pressure of 14.65 psia and to a
Printed Name Diane Colley temperature of 60o F. Authority 20 Phone (907) 564-5775 Date / �. - / AAC25.235.
Form 10-422 Rev, 5/2009 INSTRUCTIONS ON REVERSE SIDE
Submit in Duplicate
BP EXPLORATION (ALASKA) INC.
PRUDHOE BAY UNIT - FS -1
GAS FLARING INCIDENT REPORT
September 2015
Not required for unplanned events <= 1 hr
TOTAL 0
See attachments
TOTAL 0
an or Equal 1 Hour AND 775
See attachments
TOTAL 0
See attachments
TOTAL 0
Not required for unplanned events <= 1 hr
See attachments
See attachments
See attachments
Page 4
10/15/2015
10:43 AM
TOTAL
Unplanned Events < 1 Hour
0
Unplanned Events > 1 Hour
0
Planned Events < 1 hour and not
0
exceeding 5,000 MCF
Planned Events > 1 hour or
0
exceeding 5,000 MCF
Pilot Purge
10,680
Assist
26,105
TOTAL FLARED VOLUME
36,785
Not required for unplanned events <= 1 hr
See attachments
See attachments
See attachments
Page 4
10/15/2015
10:43 AM
STATE OF ALASKA
ALASKA OIL AND GAS CONSERVATION COMMISSION
FACILITY REPORT OF PRODUCED GAS DISPOSITION
1. Facility Number 2. Facility Name
0290000028 PBU FS 1
Disposition
3. Field
PBU - EOA
Volume MCF
4. Operator 5. MonthNear of Disposition
BP I October -2015
20. For production from multiple pools, list contribution of each pool as a percent of
Total Volume.
6. Sold
0
Pool Name Pool Code Percent
7. Reinjected
PRUDHOE 640150 100.00%
8. Flared or vented 1 hour or less
22,611
,
9. Flared or vented more than 1 hour (see mstr.)
3,986
10. Pilot and Purge
11,023
-
11. Assist Gas
20,245
'
12. Fuel gas used in lease operations.
574,335
13. Other (see instructions)
0
Official Use Only
.
Authorization>1 hr:
Safety
q p�
O
MCF
14. TOTAL VOLUME QTEMS 6-12)
632,200
Lease Use
MCF
15. NGL Gas Equivalent
0
Conservation
MCF
16. Purchased gas
0
Waste:
MCF
17. Transferred from: CGF
154,649
•
P
18. Transferred to: (Express as a negative #) CGF & CCP
-72,794,581
-
Commissioner Date
19, Remarks:
I hereby certify that the foregoing is true and correct to the best of my knowledge.
bw�Note: All volumes must be corrected
Signature Title Marta er Production Taxes and Royalties Alaska to pressure of 14.65 psis and to a
temperature of 60o F. Authority 20
Printed Name Diane Colley Phone (907) 564-5775 Date AAC25.235.
Form 10-422 Rev. 5/2009 INSTRUCTIONS ON REVERSE SIDE Submit in Duplicate
BP EXPLORATION (ALASKA) INC.
PRUDHOE BAY UNIT- FS -1
GAS FLARING INCIDENT REPORT
October 2015
DATE TIME VOLUME DESCRIPTION OF INCIDENT & CAUSE
10/18/2015 0701-0755 9,375 Not required for unplanned events <= 1 hr
10/18/2015 0701-0714 1,986
10/23/2015 1058-1132 11,250
TOTAL 22,611
ACTION TAKEN TO ELIMINATE CAUSE
Not required for unplanned events <= 1 hr
Unplanned Events greater than 1 hour
DATE TIME VOLUME DESCRIPTION OF INCIDENT & CAUSE ACTION TAKEN TO ELIMINATE CAUSE
10/23/2015 1058-1425 1 See attachments See attachments
10/24/2015 1400-2400 94
10/26-27/15 0000-1000 339
TOTAL 434
Planned Events Less Than or Equal 1 Hour AND <= 5,000 mcf
DATE TIME VOLUME DESCRIPTION OF INCIDENT & CAUSE ACTION TAKEN TO ELIMINATE CAUSE
See attachments See attachments
TOTAL 0
DATE TIME
10/1/2015 0330-0700
10/3/2015 1530-1750
TOTAL
Unplanned Events < 1 Hour
Unplanned Events > 1 Hour
Planned Events < 1 hour and not
exceeding 5,000 MCF
Planned Events > 1 hour or
exceeding 5,000 MCF
Pilot Purge
Assist
TOTAL FLARED VOLUME
1,554 See attachments
1,998
3,552
TOTAL
22,611
434
0
3,552
11,023
20,245
57,865
See attachments
Page 5
11/16/2015
3:35 PM
FlareStartDate 10/01/2015
Flare End Date 10/31/2015
FS1 Flare Report
Total Volume (MSCF) 26597
Report
Numbe System Date Start Time Stop Time Duration Intermittent Black Smoke Planned Reported By Volume
15-324 Flare Relief 10/01/2015 3:30:00 am 7:00:00 am 210 min No No Yes BPt\BUTLRM 1554'
Determination Cause TRC 1803 spin cooling
Action Taken Completed spin cooling.
15-323 Flare Relief 10/03/2015 3:30:00 pm 5:50:00 pm 140 min No
Determination Cause T\C 1804 spin cooling
Action Taken Completed spin cooling.
Daily Volume (MSCF) 1554
No Yes BP1\BUTLRM 1998
Daily Volume (MSCF) 1998
15-351 Flare Relief 10/23/2015 10:58:00 am 2:25:00 pm 207 min Yes No No BPIUH0 3UERC
1
Determination Cause
STV -IP TRC 1825 shutdown due to a problem associated with loss of communicastions between Honeywell computer and IP 21
Action Taken
Loaded STWIP T/C.
Daily Volume (MSCF)
11251
15-355 Flare Relief 10/24/2015 2:00:00 pm 12:00:00 am 600 min Yes No No BP1\HOGUERC
94
Determination Cause
Extended flaring event occured while awaiting operator/maintenance evaluation,c using 4th stage 20" rupture disk to rupture
Action Taken
Moved "C' h/p c/I to the Annex to lower total gas in old plant to under 1 billion to satisfy PSV limitations,waiting on parts to replace rupture
—mak.-
Daily Volume (MSCF)
94
15-363 Flare Relief 10/26/2015 12:00:00 am 120000 am 1440 min Yes No No BP1\LYLEPE
183
Determination Cause
Extended flaring event occurred while awaiting operator/maintenanceevaluation. Waiting on parts.
q
Action Taken
Still flaring, waiting on parts for 4th Stage HP rapture disc.
�3
Daily Volume (MSCF)
183
15-362 Flare Relief 10/27/2015 12:00:00 am 10:00:00 am 600 min Yes No No BP1\LYLEPE
156 1/
Determination Cause
Extended flaring event occurred while awaiting operator/maintenance evaluation. Waiting on parts.
Action Taken
Completed depressuring,repair 4th stage rupture disc
Daily Volume (MSCF)
156
Total Volume (MSCF)
26597
Generated 11106/2015 3:25:34PM Page 7 of 12
11/20/2015
Amended: Flaring Event at FS1
Amended: Flaring Event at FSI
AK, OPS PCC EOC TL [AKOPSPCCEOCTL@bp.com]
Sent:Tuesday, November 03, 2015 5:36 AM
To: AOGCC Reporting (DOA sponsored)
Cc: Loepp, Victoria T (DOA); Benson, Gary A [Gary.Benson@bp.com]; Arthur, Gregory [Gregory.Arthur@bp.com]; AK, OPS GC3&PCC
OSM [AKOPSGC3PCCOSM@BP.com]; Martin, Nelson D [Nelson.Martin@bp.com]; AK, HSSEE Env Adv East
[AKHSSEEEnvAdvEast@bp.com]; AK, OPS FS1 Facility OTL [AK0PSFS1Fadlity0TL@bp.com]; AK, OPS FSI OSM
[AKOPSFSIOSM@bp.com]; Glover, Robin (SLR) [Robin.Glover@bp.com]
Please see amended events below in red.
Thank You
Dave
David Spall (Alternate — Jennifer Blake)
PCC/EOC Production Optimization Team Lead
907-659-4472 Office
219-689-4036 Cell
david.sgali@bo.com
From: AK, OPS PCC EOC TL
Sent: Monday, November 02, 2015 8:47 PM
To: 'aogcc.reporting@alaska.gov'
Cc: 'Loepp, Victoria T (DOA) (victoria.loepp@alaska.gov)'; Benson, Gary A; Arthur, Gregory; AK, OPS GC3&PCC
OSM; Martin, Nelson D; AK, HSSEE Env Adv East; AK, OPS FSS Facility OTL; AK, OPS FS1 OSM; Glover, Robin (SLR)
Subject: Flaring Event at FSI
To: AOGCC Reporting CC: Victoria Loepp, AOGCC
aogcc. report i nq@ alas ka. gov
From: David Spall, GPB Production Optimization Team Leader
A flaring event occurred at FS1 starting at 10/23/2015 10:58 and stopping at 10/23/2015 14:25 with a volume of 1
(MSCF). The event lasted for 207 minutes. The event was due to STV -IP T\C 1825 shutdown due to a problem
associated with loss of communications between Honeywell computer and IP 21. The flaring stopped once Loaded
STV/IP T/C.
L�b\ r
A flaring event occurred at FS1 starting at 10/23/2015 10:58 and stopping at 10/23/2015 11:32 with a volume of 7
11250 (MSC F). The event lasted for 34 minutes. T\C's 1804/1804 shutdown due to a problem associated with hi
liquid level in Fuel gas knockout drum. The flaring stopped once Shut in wells, 2-6/8/28/34/37/15/22, 5-
21/23/10/19, 18-31/3/15/11/29/24/18, 1-28/19, 12-13.
A flaring event occurred at FS1 starting at 10/24/2015 14:00 and stopping at 10/25/2015 24:00 with a volume of 94
(MSCF). The event lasted for 600 minutes. The event was due to Extended flaring event occurred while awaiting
operator/maintenance evaluation, causing 4th stage 20" rupture disk to rupture. The flaring stopped once Moved "C"
h/p c/I to the Annex to lower total gas in old plant to under 1 billion to satisfy PSV limitations.
https://webm ai la.alaska.gwlmai?ae=ltem &t=1PM.N ote&i d=RgAAAABKLne2zgP4SoM kepOhCxbSBwBUvQ964rj QTgYgn3632Gd]AAAAhhLyAABUvQ964rjQT... 1/2
11/20/2015
Amended: Flaring Event at FS1
A flaring event occurred at FS1 starting at 10/26/2015 00:00 and stopping at 10/27/2015 2400 with a volume of 183
(MSCF). The event lasted for 1440 minutes. The event was due to Extended flaring event occurred while awaiting
operator/maintenance evaluation.. The flaring stopped once Completed de -pressuring and repair of 4th stage rupture
disc.
A flaring event occurred at FS1 starting at 10/27/2015 00:00 and stopping at 10/27/2015 10:00 with a volume of 156
(MSCF). The event lasted for 600 minutes. The event was due to Extended flaring event occurred while awaiting
operator/maintenance evaluation.. The flaring stopped once Completed de -pressuring and repair of 4th stage rupture
disc.
A flaring event occurred at FS1 starting at 11/01/2015 12:04 and stopping at 11/01/2015 14:18 with a volume of 5651
(MSCF). The event lasted for 134 minutes. The event was due to flaring per/EOC... from the ANNX to help CCP
Swap 1878 Tandem from LTS1 and LTS2... over to LTS3.. The flaring stopped once tandem swap was
successful... and shut in gas flow to the flare field.
A flaring event occurred at FS1 starting at 11/01/2015 19:45 and stopping at 11/01/2015 20:54 with a volume of 11
(MSCF). The event lasted for 69 minutes. The event was due Unplanned Contraction Purge happened after a
previous contraction purge had finally terminated... several hours earlier. *Annex Flare Field. The flaring stopped once
Contraction purge was complete.
Thanks
David Spall (Alternate—Jennifer Blake)
PCC/EOC Production Optimization Team Lead
907-659-4472 Office
219-689-4036 Cell
david.soall(ftD.com
httpsJ/webmalia.alaska.gov/owat?ae= Item &t=IPM.Nnte&id= RgAAAABKLne2zgP4SoM kepOhCxbSBwBU vQ964rjQTgYgn3632GdIAAAAhhLyAABUvQ964rjQT... 2/2
11/20/2015
Flaring Event at FSI
Flaring Event at FSI
AK, OPS PCC EOC TL [AKOPSPCCEOCTL@bp.com]
Sent:Monday, November 02, 2015 8:46 PM
To: AOGCC Reporting (DOA sponsored)
Cc: Loepp, Victoria T (DOA); Benson, Gary A [Gary.Benson@bp.com]; Arthur, Gregory [GregoryArthur@bp.com]; AK, OPS GC3&PCC
OSM [AKOPSGC3PCCOSM@BP.com]; Martin, Nelson D [Nelson.Martin@bp.com]; AK, HSSEE Env Adv East
[AKHSSEEEnvAdvEast@bp.com]; AK, OPS FSI Facility OTL [AKOPSFSIFacilityOTL@bp.com]; AK, OPS FSI OSM
[AKOPSFS10SM@bp.com]; Glover, Robin (SLR) [Robin.Glover@bp.com]
To: AOGCC Reporting CC: Victoria Loepp, AOGCC
ao cq c_reporting@alaska.aov
From: David Spall, GPB Production Optimization Team Leader
A flaring event occurred at FSI starting at 10/23/2015 10:58 and stopping at 10/23/2015 14:25 with a volume of 1
(MSCF). The event lasted for 207 minutes. The event was due to STV -IP T\C 1825 shutdown due to a problem I
associated with loss of communications between Honeywell computer and IP 21. The flaring stopped once Loaded
STV/IP T/C.
A flaring event occurred at FS1 starting at 10/24/2015 14:00 and stopping at 10/25/2015 24:00 with a volume of 94 y
(MSCF). The event lasted for 600 minutes. The event was due to Extended flaring event occurred while awaiting
operator/maintenance evaluation, causing 4th stage 20" rupture disk to rupture. The flaring stopped once Moved "C"
h/p c/I to the Annex to lower total gas in old plant to under 1 billion to satisfy PSV limitations.
A flaring event occurred at FS1 starting at 10/26/2015 00:00 and stopping at 10/27/2015 2400 with a volume of 183 10 2j
(MSCF). The event lasted for 1440 minutes. The event was due to Extended flaring event occurred while awaiting 10
operator/maintenance evaluation.. The flaring stopped once Completed de -pressuring and repair of 4th stage rupture
disc.
A flaring event occurred at FS1 starting at 10/27/2015 00:00 and stopping at 10/27/2015 10:00 with a volume of 156
(MSCF). The event lasted for 600 minutes. The event was due to Extended flaring event occurred while awaiting )5�
operator/maintenance evaluation.. The flaring stopped once Completed de -pressuring and repair of 4th stage rupture
,vo v y
A flaring event occurred at FS1 starting at 11/01/2015 12:04 and stopping at 11/01/2015 14:18 with a volume of 5651
(MSCF). The event lasted for 134 minutes. The event was due to flaring per/EOC ... from the ANNX to help CCP
Swap 1878 Tandem from LTS1 and LTS2... over to LTS3.. The flaring stopped once tandem swap was
successful... and shut in gas flow to the flare field.
A flaring event occurred at FS1 starting at 11/01/2015 19:45 and stopping at 11/01/2015 20:54 with a volume of 2242
(MSCF). The event lasted for 69 minutes. The event was due Unplanned Contraction Purge happened after a
previous contraction purge had finally terminated... several hours earlier. `Annex Flare Field. The flaring stopped once
Contraction purge was complete.
Thanks
David Spall (Alternate—Jennifer Blake)
PCC/EOC Production Optimization Team Lead
907-659-4472 Office
219-689-4036 Cell
david.soallC@bp.com
https:/Avebmai la.alaska.gm/owat?ae=ltem&t= IPM.N ote&id=RgAAAABKLne?zgP4SoM kepOhCxbSBwBUvQ964rj QTgYgn3632GdIAAAAhhLyAABU vQ964rj QT... 1/2
11125/2015 Flaring Event at FS1- Enterprise Vault Archived Item
From AK, OPS PCC EOC TL Date 10/18/2015, 6:17:17 PM
To AOGCC Reporting (DOA sponsored)
Cc Loepp, Victoria T (DOA); Benson, Gary A; Arthur, Gregory; AK, OPS GC3&PCC OSM; Martin, Nelson D;
AK, HSSEE Env Adv East; AK, OPS FS1 Facility OTL; AK, OPS FS1 OSM; Glover, Robin (SLR)
Subject Flaring Event at FS1
To: AOGCC Reporting CC: Victoria Lcepp, AOGCC
aoacc.reoortino()alaska.00v
L I �✓
From: Jennifer Blake, GPB Production Optimization Team Leader
A flaring event occurred at FS1 starting at 10/18/2015 07:01 and stopping at 10/18/2015 07:55 with a volume of
9375 (MSCF). The event had a volume greater than 5000 (MSCF) and was due to TIC1804 shutdown from a
problem associated with turbine hydraulic pressure. The flaring stopped once production rates were reduced
sufficiently.
Thanks
Jennifer Blake
PCC/EOC Production Optimization Team Lead (alt David Spall)
Office (907) 659-4472
Cell (907) 830-6204
Jennifer.blakePbo.com
Jennifer Blake
PCC/EOC Production Optimization Team Lead (alt David Spall)
Office (907) 659-4472
Cell (907) 830-6204
Jennifer.blake@bp.com
https://ancev02.sw.alaska.gov/Enterp( iseVaultMewMessage.asp?Vaultld=1870ADEC3E0501 E4AB0D8874B7CF6E0BA1110000jnuev02&Savesetld=20151118... 1/1
STATE OF ALASKA
ALASKA OIL AND GAS CONSERVATION COMMISSION
FACILITY REPORT OF PRODUCED GAS DISPOSITInN
1. Facility Number
0290000028
2. FacilityName
PBU FS 1
3. Field
PBU - EOA
4. Operator •5.
BP
MonthNear of Disposition
I November -2015
Disposition
Volume MCF
20. For production from multiple pools, list contribution of each pool as a percent of
Total Volume.
6. Sold
0
Pool Name Pool Code Percent
7. Reinjected
0
PRUDHOE 640150 100.00%
8. Flared or vented 1 hour or less
8,576
9. Flared or vented more than 1 hour (see instr.)
5,662
10. Pilot and Purge
10,862
11. Assist Gas
16,864
12. Fuel gas used in lease operations.
623,675
13. Other (see instructions)
Official Use Only
Authorization >1 he
Safety
y�lo �oZ
MCF
14. TOTAL VOLUME (ITEMS 6-12)
665,639
Lease Use
MCF
15. NGL Gas Equivalent
0
Conservation
MCF
16. Purchased gas
Waste:
MCF
17. Transferred from: CGF
167,668
/Commissioner-`_ f0
18. Transferred to: (Express as a negative #) CGF 8 CCP
-81,024,964
Date
19. Remarks:
I hereby certify that the foregoing is true and correct to the best of my knowledge.
Note: All volumes must be corrected
Signature /,� j (,L. (�(,g/ Q,�� Title Manager Production Taxes and Royalties Alaska to pressure of 14.65 psia and to a
/. temperature of 60o F. Authority 20
Printed Name Diane Colley Phone (907) 564-5775 Date AAC25.235.
Form 10-422 Rev. 5/2009 INSTRUCTIONS ON REVERSE SIDE Submit in Duplicate
BP EXPLORATION (ALASKA) INC.
PRUDHOE BAY UNIT - FS -1
GAS FLARING INCIDENT REPORT
November 2015
jUnplanned Events less than or equal to 1 hour
DATE TIME VOLUME DESCRIPTION OF INCIDENT & CAUSE ACTION TAKEN TO ELIMINATE CAUSE
11/28/2015 1135-1213 8,576 Not required for unplanned events <= 1 hr Not required for unplanned events <= 1 hr
TOTAL 8,576
11/1/2015 1945-2054 11 See attachments See attachments
TOTAL 11
Planned Events Less Than or Equal 1 Hour AND <= 5.000 mcf
11/1/2015
TOTAL
1204-1418
TOTAL
Unplanned Events < 1 Hour
Unplanned Events > 1 Hour
Planned Events < 1 hour and not
exceeding 5,000 MCF
Planned Events > 1 hour or
exceeding 5,000 MCF
Pilot Purge
Assist
TOTAL FLARED VOLUME
See attachments
I
5,651 See attachments
5,651
TOTAL
8,576
11
0
5,651
10,862
16,864
41,964
See attachments
See attachments
Page 3
12/15/2015
9:52 AM
Flare Start Date 11/01/2015
Flare End Date 11/302015
FS1 Flare Report Total Volume (MSCF) 14238
Report
Numbe System Date Start Time Stop Time Duration Intermittent Black Smoke Planned Reported By Volume
15-358 Flare Relief 11/012015 12:04:00 pm 2:18:00 pm 134 min No No Yes BPIXMCLAURN 5651
Determination Cause Began flaring per/EOC... from the ANNX to help CCP Swap 1878 Tandem from LTSi and LTS2...over to LTS3.
Action Taken Received call from EOC that Tandem swap was successful... and shut in gas flow to the flare field.
15-368 Flare Relief 11/012015 7:45:00 pm 8:54:00 pm 69 min Yes No No BP1\MCLAURN 11
Determination Cause Unplanned Contraction Purge happened after a previous contraction purge had finally terminated... several hours eadier. *Annex Flare Field.
Action Taken No steps were taken to terminate this Contraction Purge.
Daily Volume (MSCF) 5662
Total Volume (MSCF) 14238
Generated 12/03/2015 4:18:41 PM Page 3 of 7
11/30/2015
Flaring Event at FSI
Flaring Event at FS1
AK, OPS PCC EOC TL [AKOPSPCCEOCTL@bp.com]
Sent:Sunday, November 29, 2015 4:03 PM
To: AOGCC Reporting (DOA sponsored)
Cc: Loepp, Victoria T (DOA); Benson, Gary A [Gary.Benson@bp.com]; Arthur, Gregory [Gregory.Arthur@bp.com]; AK, OPS GC3&PCC
OSM [AKOPSGC3PCCOSM@BP.com]; Martin, Nelson D [Nelson.Martin@bp.com]; AK, HSSEE Env Adv East
[AKHSSEEEnvAdvEast@bp.com]; AK, OPS FSI Facility OTL [AKOPSFS1FacllityOTL@bp.com]; AK, OPS FS1 OSM
[AKOPSFSIOSM@bp.com]; Glover, Robin (SLR) [Robin.Glover@bp.com]
To: AOGCC Reporting CC: Victoria Loepp, AOGCC
aogcc. reoorting@alaska.Qov
From: David Spall, GPB Production Optimization Team Leader
A flaring event occurred at FSI starting at 11/28/2015 11:35 and stopping at 11/28/2015 12:13 with a volume of 8576
(MSCF). The event lasted for 38 minutes. The event was due to CGF booster 1802 S/D. Flared off of Annex. The
flaring stopped once S/I wells 2-18,2-38,541,7-6,15-1,158.
Thanks
David Spall (Alternate—Jennifer Blake)
PCC/EOC Production Optimization Team Lead
907-659-4472 Office
219-689-4036 Cell
Error! Hyperlink reference not valid.
httpsJ/webmaila.alaska.gm/mat?ae=Item&t=IPM.Note&id=RgAAAABKLne2zgP4SoM kepOhCxbSBwBUvQ964rjQTgYgn3632GdIAAAAhhLyAABUvQ964rjQT... 1/1
11/30/2015
Flaring Event at FSI
Flaring Event at FS1
AK, OPS PCC EOC TL [AKOPSPCCEOCTL@bp.com]
Sent:Monday, November 02, 2015 8:46 PM
To: AOGCC Reporting (DOA sponsored)
Cc: Loepp, Victoria T (DOA); Benson, Gary A [Gary.Benson@bp.com]; Arthur, Gregory [Gregory.Arthur@bp.com]; AK, OPS GC3&PCC
OSM [AKOPSGC3PCCOSM@BP.com]; Martin, Nelson D [Nelson.Martin@bp.com]; AK, HSSEE Env Adv East
[AKHSSEEEnvAdvEast@bp.com]; AK, OPS FS1 Facility OTL [AKOPSFS1FacilityOTL@bp.com]; AK, OPS FS1 OSM
[AKOPSFSIOSM@bp.com]; Glover, Robin (SLR) [Robin.Glover@bp.com]
To: AOGCC Reporting CC: Victoria Loepp, AOGCC
aogcc.reporting Walaska.gov
From: David Spall, GPB Production Optimization Team Leader
A flaring event occurred at FSI starting at 10/23/2015 10:58 and stopping at 10/23/2015 14:25 with a volume of 1
(MSCF). The event lasted for 207 minutes. The event was due to STV -IP T\C 1825 shutdown due to a problem
associated with loss of communications between Honeywell computer and IP 21. The flaring stopped once Loaded
STV/IP T/C.
A flaring event occurred at FS1 starting at 10/24/2015 14:00 and stopping at 10/25/2015 24:00 with a volume of 94
(MSCF). The event lasted for 600 minutes. The event was due to Extended flaring event occurred while awaiting
operator/maintenance evaluation, causing 4th stage 20" rupture disk to rupture. The flaring stopped once Moved "C"
h/p c/I to the Annex to lower total gas in old plant to under 1 billion to satisfy PSV limitations.
A flaring event occurred at FS1 starting at 10/26/2015 00:00 and stopping at 10/27/2015 2400 with a volume of 183
(MSCF). The event lasted for 1440 minutes. The event was due to Extended flaring event occurred while awaiting
operator/maintenance evaluation.. The flaring stopped once Completed de -pressuring and repair of 4th stage rupture
disc.
A flaring event occurred at FS1 starting at 10/27/2015 00:00 and stopping at 10/27/2015 10:00 with a volume of 156
(MSCF). The event lasted for 600 minutes. The event was due to Extended flaring event occurred while awaiting
operator/maintenance evaluation.. The flaring stopped once Completed de -pressuring and repair of 4th stage rupture
disc.
A flaring event occurred at FS1 starting at 11/01/2015 12:04 and stopping at 11/01/2015 14:18 with a volume of 5651
(MSCF). The event lasted for 134 minutes. The event was due to flaring per/EOC...from the ANNX to help CCP
Swap 1878 Tandem from LTS1 and LTS2... over to LTS3.. The flaring stopped once tandem swap was
successful... and shut in gas flow to the flare field.
A flaring event occurred at FS1 starting at 11/01/2015 19:45 and stopping at 11/01/2015 20:54 with a volume of 2242
(MSCF). The event lasted for 69 minutes. The event was due Unplanned Contraction Purge happened after a
previous contraction purge had finally terminated... several hours earlier. `Annex Flare Field. The flaring stopped once
Contraction purge was complete.
Thanks
David Spall (Alternate—Jennifer Blake)
PCC/EOC Production Optimization Team Lead
907-659-4472 Office
219-689-4036 Cell
david.soall6ft.com
https://webmai la.alaska.gov/owa/?ae=ltem &t=1PM.N ote&i d= RgAAAASKLne2zgP4SoM kepOhCxbSBwBUvQ964rjQTgYgn3632GdIAAANA6xYAABUvQ964rj QT... 1/2
STATE OF ALASKA
ALASKA OIL AND GAS CONSERVATION COMMISSION
FACILITY REPORT OF PRODUCED GAS DISPOSITION
1. Facility Number
0290000028
2. Facility Name
PBU FS 1
3. Field
PBU - EOA
4. Operator
BP
5. Month/Year of Disposition
I December -2015
Disposition
Volume MCF
20. For production from multiple pools, list contribution of each pool as a percent of
Total Volume.
6. Sold
0
Pool Name Pool Code Percent
7. Reinjected
U
PRUDHOE 640150 100.00%
8. Flared or vented 1 hour or less
0
9. Flared or vented more than 1 hour (see instr.)
0
10. Pilot and Purge
11,435
11. Assist Gas
16,896
12. Fuel gas used in lease operations.
636,246
13. Other (see instructions)
0
Official Use Only
Authorization>1 he
Safety
MCF
14, TOTAL VOLUME (ITEMS 6.12)
664,577
Lease Use
MCF
15. NGL Gas Equivalent
0
Conservation
MCF
16. Purchased gas
UMCF
Waste:
17. Transferred from: CGF
188,934
Commissioner Date
18. Transferred to: (Express as a negative #) CGF &CCP
-$2,811,477
19. Remarks:
I hereby certify that the foregoing lids true and correct to the best of my knowledge.
/ilYui �A Note: All volumes must be corrected
Signature U � 7 Title Mana er Production Taxes and Ro pities Alaska t0 pressure Of 14.65 psis and to a
temperature of 60o F. Authority 20
Printed Name Diane ColleyPhone (907) 564-5775 Date 1115-116 AAC25.235.
Form 10422 Rev. 5/2009 INSTRUCTIONS ON REVERSE SIDE Submit in Duplicate
BP EXPLORATION (ALASKA) INC.
PRUDHOE BAY UNIT - FS -1
GAS FLARING INCIDENT REPORT
December 2015
Events less than or
Not required for unplanned events <= 1 hr
TOTAL 0
Events greater than 1 hour
Not required for unplanned events <= 1 hr
See attachments See attachments
TOTAL 0
Planned Events Less Than or Equal 1 Hour AND <= 5.000 mcf
See attachments
TOTAL 0
TOTAL
Unplanned Events < 1 Hour
Unplanned Events> 1 Hour
Planned Events < 1 hour and not
exceeding 5,000 MCF
Planned Events > 1 hour or
exceeding 5,000 MCF
Pilot Purge
Assist
TOTAL FLARED VOLUME
See attachments
0
TOTAL
0
0
0
0
11,435
16,896
28,331