STATE OF ALASKA
ALASKA OIL AND GAS CONSERVATION COMMISSION
FACILITY REPORT OF PRODUCED GAS DISPOSITION
RECEIVED
FEB 19 2015
A OGCC
1. Facility Number
0290000029
2. Facility Name
PB FS 2
3. Field
PBU - EOA
4. Operator
BP
5. Month Year of Disposition
January -2015
Disposition
Volume MCF
20. For production from multiple pools, list contribution of each pool as a percent of
Total Volume.
6. Sold
0
Pool Name PoolCode Percent
7. Reinjected
0
PRUDHOE 640150 100.00%
8. Flared or vented 1 hour or less
0
9. Flared or vented more than 1 hour (see instr.)
1,390
10. Pilot and Purge
12,318
11. Assist Gas
1,426
12. Fuel gas used in lease operations.
709,237
13. Other (see instructions)
0
Official Use OnlyAuthorization>1
hr:
Safety
/
MCF
14. TOTAL VOLUME (ITEMS 6.12)
724,371
Lease Use
MCF
15. NGL Gas Equivalent
0
Conservation
MCF
16. Purchased gas
0
Waste:
MCF
17. Transferred from: CGF
300,666
3 -23 -1,S -
J -15118.
8. Transferred to: (Express as a negative #) CGF
-16,308,359
Commissioner Date
19. Remarks:
I hereby certify that a foregoing is true and correct to the best of my knowledge.
6liWf U Note: All volumes must be corrected
Signature �� Title Manager Production Taxes and Ro allies Alaska to pressure of 14.65 psia and to a
Printed Name Diane Colley6Oo F. Authority 20
/ /� temperature of
Phone (907) 564-5775 Date AAC25.235.
vrL-
311-7115-
Form
311-7115
Form 10-422 Rev. 512009 INSTRUCTIONS ON REVERSE SIDE Submit in Duplicate
BP EXPLORATION (ALASKA) INC.
PRUDHOE BAY UNIT - FS -2
GAS FLARING INCIDENT REPORT
January 2015
RECEIVED
FEB 19 2015
AOGCC
Unplanned Events less than or equal to 1 hour
DATE TIME VOLUME DESCRIPTION OF INCIDENT& CAUSE ACTION TAKEN TO ELIMINATE CAUSE
Not required for unplanned events <= 1 hr Not required for unplanned events <= 1 hr
TOTAL 0
Unplanned Events greater than 1 hour
DATE TIME VOLUME DESCRIPTION OF INCIDENT & CAUSE ACTION TAKEN TO ELIMINATE CAUSE
1/6/2015 1045-1531 1,390 See attachments See attachments
TOTAL 1,390
Planned Events Less Than or Equal 1 Hour AND <= 5,000 mcf
DATE TIME VOLUME DESCRIPTION OF INCIDENT & CAUSE ACTION TAKEN TO ELIMINATE CAUSE
See attachments See attachments
TOTAL 0
DESCRIPTION OF INi
See attachments
TOTAL 0
ACTION TAKEN TO E
See attachments
Page 5
2/12/2015
10:37 AM
TOTAL
Unplanned Events < 1 Hour
0
Unplanned Events > 1 Hour
1,390
Planned Events < 1 hour and not
0
exceeding 5,000 MCF
Planned Events > 1 hour or
0
exceeding 5,000 MCF
Pilot Purge
12,318
Assist
1,426
TOTAL FLARED VOLUME
15,134
ACTION TAKEN TO E
See attachments
Page 5
2/12/2015
10:37 AM
Flare Start Date 01/01/2015
Flare End Date 01/31/2015
FS2 Flare Report Total Volume (MSCF) 1390
Report
Numbe
System Date Start Time
Stop Time
Duration Intermittent Black Smoke Planned Reported By Volume
15-6
Controlled Blowdown 01/06/2015 10:45:00 am
3:31:00 pm
286 min No No No BP1\BARKER) 1390
Determination Cause Shut down 1801 to remove water found in the seal oil
Action Taken Completed seal oil changeout and brought compressor back on line
Daily Volume (MSCF) 1390
Total Volume (MSCF) 1390
Generated 02/03/2015 8:58-.00AM Page 4 of 6
Hunt, Jennifer L (DOA)
From:
AK, OPS PCC EOC TL <AKOPSPCCEOCTL@bp.com>
Sent:
Saturday, January 10, 2015 12:40 PM
To:
Hunt, Jennifer L (DOA)
Cc:
Loepp, Victoria T (DOA); Roby, David S (DOA); Castano, Alejandra; Benson, Gary A;
Arthur, Gregory; AK, HSSEE Env Adv West; Loader, Neil; Hauger, Wayne A; AK, HSSEE
Env Adv East; AK, OPS FS3 Facility OTL; AK, OPS FS3 OSM; AK, OPS GC3&PCC OSM; AK,
OPS PCC EOC TL; AK, OPS FS2 Facility OTL; AK, OPS FS2 OSM; AK, OPS GPMA Facility
OTL, AK, OPS GPMA OSM
Subject:
Flaring Events AWS3, and LPC
To: Jennifer Hunt, AOGCC CC: Dave Roby, AOGCC CC: Victoria Ferguson,
AOGCC
lennifer.hunt(a)alaska.gov dave.robv(a)alaska.gov victoria.ferguson?a.alaska.9
ov
From: Wendy Hiester, GPB Production Optimization Team Leader
FS2
A flaring event occurred at FS2 starting at 01/06/2015 10:45 and stopping at 01/06/2015 15:31 with a volume of
1390 (MSCF). The event lasted for 286 minutes and occurred when the 1801 compressor was shut down to
remove water found in the seal oil. Flaring stopped when the seal oil change out was completed and the
compressor was brought back on line.
A flaring event occurred at FS2 starting at 12/23/2014 07:21 and stopping at 12/23/2014 08:45 with a volume of
114 (MSCF). The event lasted for 84 minutes and occurred when C/L 16 D was depressured for anchor chop
work. Flaring stopped when depressuring was completed.
A flaring event occurred at FS2 starting at 12/22/2014 07:19 and stopping at 12/22/2014 08:30 with a volume of
114 (MSCF). The event lasted for 71 minutes and occurred when C/L 16D common line was shut down and
depressured for anchor chop work. Flaring stopped when depressuring was completed.
A flaring event occurred at FS2 starting at 12/21/2014 07:16 and stopping at 12/21/2014 08:30 with a volume of
114 (MSCF). The event lasted for 74 minutes and occurred when C/L 16D common line was shut down and
depressured for anchor chop work. Flaring stopped when depressuring was completed.
FS3
A flaring event occurred at FS3 starting at 12/16/2014 09:47 and stopping at 12/16/2014 10:07 with a volume of
9167 (MSCF). The event had a volume greater than 5000 (MSCF). The event occurred during Acoustic Testing
of the Main Gas outlet valve F6AV in 4922 which required closing the valve temporarily. Flaring stopped when
the acoustic test of F6AV was completed and the gas flow to through the valve was restored.
LPC
A flaring event occurred at LPC starting at 12/27/2014 12:21 and stopping at 12/27/2014 13:35 with a volume
of 5193 (MSCF). The event lasted for 74 minutes and occurred when the 1808 Reinjection compressor
shutdown because of control/instrumentation failure associated with C2 Compressor #2 Axial. Flaring stopped
when troubleshooting was completed, the compressor restarted, and the facility stabilized.
STATE OF ALASKA
ALASKA OIL AND GAS CONSERVATION COMMISSION
FACILITY REPORT OF PRODUCED GAS DISPOSITION
1. Facility Number
0290000029
2. Facility Name
PBU FS 2
3. Field
PBU - EOA
4. Operator
BP
5. MonlhNear of Disposition
I February -2015
Disposition
Volume MCF
20. For production from multiple pools, list contribution of each pool as a percent of
Total Volume.
6. Sold
O
Pool Name Pool Code Percent
7. Reinjected
O
PRUDHOE 640150 100.00-/.-
00.00%8.
8.Flared or vented l hour or less
0
9. Flared or vented more than 1 hour (see instr.)
4,700
10. Pilot and Purge
11,120
11. Assist Gas
9,273
12. Fuel gas used in lease operations.
640,595
13. Other (see instructions)
0
Official Use Only
Authorization >7 hr.
Safety
T 7 �
7
MOP
14. TOTAL VOLUME (ITEMS 6.12)
665,688
Lease Use
MCF
15. NGL Gas Equivalent
0
Conservation
MCF
16. Purchased gas
0
Waste:
MCF
17. Transferred from: CGF
271,264
18. Transferred to: (Express as a negative #) CGF
-14,573,938
Com issioner Date
19. Remarks:
I hereby certify that the foregoing is true and correct to the best of my knovAedge.
Note: All volumes must be corrected
dal,
Signature (a" I, Title Manager Production Taxes a d Ro albes Alaska to pressure of 14.65 psia and to a
temperature of 60o F. Authority 20
Printed Name Diane ColleyPhone (907) 564-5775 Date= (J/ r_ AAC25.235.
VT L
fltoj[S
Form 10-422 Rev. 512009 INSTRUCTIONS ON REVERSE SIDE Submit in Duplicate
Events less than or
TOTAL
Events greater than
VLallrlll14
VOLUME
U
BP EXPLORATION (ALASKA) INC.
PRUDHOE BAY UNIT - FS -2
GAS FLARING INCIDENT REPORT
February 2015
Not required for unplanned events <= 1 hr
See attachments
ACTION TAKEN TO ELIMINATE CAUSE
Not required for unplanned events <= 1 hr
See attachments
TOTAL 0
Planned Events Less Than or Equal 1 Hour AND <= 5,000 mcf
DATE TIME VOLUME DESCRIPTION OF INCIDENT & CAUSE ACTION TAKEN TO ELIMINATE CAUSE
See attachments See attachments
DATE
2/22/2015
TOTAL
0500-2300
TOTAL
Unplanned Events < 1 Hour
Unplanned Events > 1 Hour
Planned Events < 1 hour and not
exceeding 5,000 MCF
Planned Events > 1 hour or
exceeding 5,000 VICE
Pilot Purge
Assist
TOTAL FLARED VOLUME
N
(E DESCRIPTION OF INCIDENT&
4,700 See attachments
TOTAL
0
0
0
4,700
11,120
9,273
25,093
ACTION TAKEN TO ELIMINATE CAUSE
See attachments
Page 5
3/13/2015
2:18 PM
Flare Start Date 02/01/2015
Flare End Date 02/28/2015
FS2 Flare Report Total Volume (MSCF) 4700
Report
Numbe System Date StartTime Stop Time Duration Intermittent Black Smoke Planned Reported By Volume
15-50 Controlled Blowdown 02/22/2015 5:00:00 am 11:00:00 pm 1080 min No No Yes BP1\WOLCJO 4700
Determination Cause -RC 1801 shutdown for planned maintenance, 4000 hr major gg swap.
Action Taken Loaded SNIP T/C.
Total Volume (MSCF) 4700
Generated 03/08/2015 2:03:09PM Page 6 of 9
Hunt, Jennifer L (DOA)
From:
AK, OPS PCC EOC TL <AKOPSPCCEOCTL@bp.com>
Sent:
Tuesday, March 10, 2015 12:34 PM
To:
Hunt, Jennifer L (DOA)
Cc:
Loepp, Victoria T (DOA); Castano, Alejandra; Benson, Gary A; Arthur, Gregory; AK, HSSEE
Env Adv West; Loader, Neil; AK, OPS GC3&PCC OSM; AK, HSSEE Env Adv East; AK, OPS
FS2 Facility OTL; AK, OPS FS2 OSM
Subject:
Flaring Event atm
To: Jennifer Hunt, AOGCC CC: Victoria Ferguson, AOGCC
lennifer.hunt 7a alaska.gov victoria.ferauson(cDalaska.gov
From: Jennifer Blake, GPB Production Optimization Team Leader
A flaring event occurred at FS2 starting at 02/22/2015 05:00 and stopping at 02/22/2015 23:00 with a volume of 4700
(MSCF). The event lasted for 1080 minutes and was due shutting down the turbine compressor 1801 for planned
maintenance. Flaring stopped when the turbine compressor was started up and reloaded.
Please let me know if you have any questions.
Thanks,
Jennifer Blake
PCC/ECC Production Optimization Team Lead
Office (907) 659-4472
Cell (907) 830-6204
Jennifer.blake@bo.com
STATE OF ALASKA
ALASKA OIL AND GAS CONSERVATION COMMISSION
FACILITY REPORT OF PRODUCED GAS DISPOSITION
1. Facility Number
0290000029
2. Facility Name
PBU FS 2
3. Field
PBU - ECA
4. Operator
BP
5. Month/Year of Disposition
I March -2015
Disposition
Volume MCF
20. For production from multiple pools, list contribution of each pool as a percent of
Total Volume.
6. Sold
U
Pool Name Pool Code Percent
7. Reinjected
O
PRUDHOE 640150 100.00°/
8. Flared or vented 1 hour or less
U
9. Flared or vented more than 1 hour (see instr.)
93,500
10. Pilot and Purge
12,209
11. Assist Gas
152,906
12. Fuel gas used in lease operations.
684,129
13. Other (see instructions)
U
Official Use Only
Authorization >7 h[
Safety
/� 25G D
MCF
ib. TOTAL VOLUME (ITEMS 6-12)
942,744
Lease Use
MCF
15. NGL Gas Equivalent
0
Conservation
MCF
16. Purchased gas
0
Waste:
MCF
17. Transferred from: CGF
251,893
18. Transferred to: (Express as a negative #) CGF
-16,867,890
Commissioner Date
19. Remarks:
hereby certify that the foregoing is true and correct to the best of my knowledge.
Note: All volumes must be corrected
Signature 11A Title Manager Production Taxes and Ro alties Alaska to pressure of 14.65 psis and to a
Printed Name Diane Co) ey Phone (907) 564-5775 Date temperature of 60o F. Authority 20
AAC25.235.
V7L—
Form 10-422 Rev. 5/2009 INSTRUCTIONS ON REVERSE SIDE Submit in Duplicate
BP EXPLORATION (ALASKA) INC.
PRUDHOE BAY UNIT - FS -2
GAS FLARING INCIDENT REPORT
March 2015
Unplanned Events less than or equal to 1 hour
DATE TIME VOLUME DESCRIPTION OF INCIDENT & CAUSE ACTION TAKEN TO ELIMINATE CAUSE
Not required for unplanned events <= 1 hr Not required for unplanned events <=1 hr
TOTAL 0
Unplanned Events greater than 1 hour
DATE TIME VOLUME DESCRIPTION OF INCIDENT & CAUSE ACTION TAKEN TO ELIMINATE CAUSE
See attachments See attachments
TOTAL 0
Planned Events Less Than or Equal 1 Hour AND <= 5,000 mcf
DATE TIME VOLUME DESCRIPTION OF INCIDENT & CAUSE ACTION TAKEN TO ELIMINATE CAUSE
See attachments See attachments
TOTAL 0
gni c nrvi❑
VULUML DESCRIPTION OF IN
3/16-31/15 1000-2400
93,500 See attachments
TOTAL
93,500
TOTAL
Unplanned Events < 1 Hour
0
Unplanned Events> 1 Hour
0
Planned Events < 1 hour and not
0
exceeding 5,000 MCF
Planned Events > 1 hour or
93,500
exceeding 5,000 MCF
Pilot Purge
12,209
Assist
152,906
TOTAL FLARED VOLUME
258,615
See attachments
CAUSE
Page 4
4/11/2015
4:06 PM
FlareStartDate 03/01/2015
Flare End Date 03/31/2015
FS2 Flare Report
Total Volume (MSCF) 93500
Report
Numbe System Date Start Time Stop Time Duration Intermittent Black Smoke Planned Reported By Volume
15-65 Controlled Blowdown 03/16/2015 10:00:00 am 11:59:00 pm 839 min No
No
Yes BPI\MITCHEB
3500
Determination Cause -RC 1801 shutdown for planned maintenance
No
Yes BPI\ELLISOFD
6000
Action Taken 1801 was shutdown for planned maintenance and is floating on flare
Action Taken 1801 is shutdown for planned maintenance and is floating on flare.
Daily Volume (MSCF)
3500
15$6 Controlled Blowdown 03/17/2015 12:00:00 am 11:59:00 pm 1439 min No
No
Yes BP1\LALAJR
6000
Determination Cause M 1801 shutdown for planned maintenance
No
Yes BP1\ELLISOFD
6000
Action Taken 1801 was shut down for planned maintenance and is floating on flare.
Action Taken 1801 is shutdown for planned maintenance and is floating on flare.
Daily Volume (MSCF)
6000
15-67 Controlled Blowdown 03/18/2015 12:00:00 am 11:59:00 pm 1439 min No
No
Yes BP1WITCHEB
6000
Determination Cause T\C 1801 shutdown for planned maintenance
No
Yes BP1\ELLISOFD
6000
Action Taken 1801 shut in for planned maintenance and is floating on flare.
Action Taken T\C 1801 shutdown for planned maintenance and floating on flare.
Daily Volume (MSCF)
6000
15-68 Controlled Blowdown 03/19/2015 12:00:00 am 11:59:00 pm 1439 min No
No
Yes BP1\MITCHEB
6000
Determination Cause T\C 1801 shutdown for planned maintenance
No
Yes BP1\ELLISOFD
6000
Action Taken 1801 is shutdown for planned maintenance and is floating on flare.
15-70 Controlled Blowdown 03/20/2015 12:00:00 am 11:59:00 pm 1439 min No
Determination Cause -RC 1801 shutdown for planned maintenance
Action Taken 1801 is shutdown for planned maintenance and is floating on flare.
15-71 Controlled Blowdown 03/21/2015 12:00:00 am 11:59:00 pm 1439 min No
Determination Cause T\C 1801 shutdown for planned maintenance
Action Taken 1801 shutdown for planned maintenance and is floating on flare.
Daily Volume (MSCF) 6000
No Yes BP1\ELLISOFD 6000
Daily Volume (MSCF) 6000
No Yes BPI\ELLISOFD 6000
Generated 04/03/2015 3:26:36PM
Daily Volume (MSCF) 6000
Page 4 of 8
Daily Volume (MSCF)
6000
15-73 Controlled Blowdown 03/22/2015 12:00:00 am 11:59:00 pm 1439 min No
No
Yes BPI\ELLISOFD
6000
Determination Cause T\C 1801 shutdown for planned maintenance
Action Taken 1801 is shutdown for planned maintenance and is floating on flare.
Daily Volume (MSCF)
6000
15-74 Controlled Blowdown 03/23/2015 12:00:00 am 11:59:00 pm 1439 min No
No
Yes BP1\ELLISOFD
6000
Determination Cause T\C 1801 shutdown for planned maintenance
Action Taken 1801 is shutdown for planned maintenance and is floating on flare.
Daily Volume (MSCF)
6000
15-75 Controlled Blowdown 03/24/2015 12:00:00 am 11:59:00 pm 1439 min No
No
Yes BP1\ELLISOFD
6000
Determination Cause T\C 1801 shutdown for planned maintenance.
Action Taken T\C 1801 shutdown for planned maintenance and floating on flare.
Daily Volume (MSCF)
6000
15-76 Controlled Blowdown 03/25/2015 12:00:00 am 11:59:00 pm 1439 min No
No
Yes BP1\ELLISOFD
6000
Determination Cause -RC 1801 shutdown for planned maintenance
Action Taken T/C 1801 shutdown for planned maintenance and floating on flare
Generated 04/03/2015 3:26:36PM
Daily Volume (MSCF) 6000
Page 4 of 8
Flare Start Date 03/01/2015
Flare End Date 03/31/2015
15-77 Controlled Blowdown 03/26/2015 12:00:00 am 11:59:00 pm 1439 min No
No
Determination Cause T\C 1801 shutdown for planned maintenance
Action Taken T/C 1801 shutdown for planned maintenance and floating on flare.
15-78 Controlled Blowdown 03/27/2015 12:00:00 am 11:59:00 pm 1439 min No
No
Determination Cause -RC 1801 shutdown for planned maintenance
Action Taken TIC 1801 SHUTDOWN FOR PLANNED MAINTENANCE AND FLOATING
ON FLARE
15-80 Controlled Blowdown 03/28/2015 12:00:00 am 11:59:00 pm 1439 min No
No
Determ inatlon Cause TC 1801 shutdown for planned maintenance
Action Taken T/C 1801 shutdown for planned maintenance and floating on flare.
15-82 Controlled Slowdown 03/29/2015 12:00:00 am 11:59:00 pm 1439 min No
No
Determination Cause T\C 1801 shutdown for planned maintenance
Action Taken Shutdown T/C 1801 for planned maintenance and floating on flare
15-84 Controlled Blowtlown 03/30/2015 12:00:00 am 11:59:00 pm 1439 min No
No
Determination Cause TC 1801 shutdown for planned maintenance
Action Taken T\C 1801 shutdown for planned maintenance and floating on flare.
Yes BP1\ELLISOFD 6000
Daily Volume (MSCF) 6000
Yes BP1\ELLISOFD 6000
Daily Volume (MSCF) 6000
Daily Volume (MSCF) 6000
Yes BP1\ELLISOFD 6000
Daily Volume (MSCF) 6000
Yes BP1\ELLISOFD 6000
Daily Volume (MSCF) 6000
15-65 Controlled Blowdown 03/31/2015 12:00:00 am 11:59:00 pm 1439 min No No Yes BP1\ELLISOFD 6000
Determination Cause T\C 1801 shutdown for planned maintenance
Action Taken Completed depressunng T/C 1801 for planned maintenance and floating on flare
Daily Volume (MSCF) 6000
Total Volume (MSCF) 93500
Generated 04/03/2015 3:26:36PM Page 5 of 8
Hunt, Jennifer L (DOA)
From: AK, OPS PCC EOC TL <AKOPSPCCEOCTL@bp.com>
Sent: Tuesday, April 07, 2015 10:08 AM
To: Hunt, Jennifer L (DOA)
Cc: Loepp, Victoria T (DOA); Castano, Alejandra; Benson, Gary A; Arthur, Gregory; AK, HSSEE
Env Adv West; Loader, Neil; AK, OPS GC3&PCC OSM; AK, HSSEE Env Adv East; AK, OPS
FS2 Facility OTL; AK, OPS FS2 OSM
Subject: Flaring Event at FS2
To: Jennifer Hunt, AOGCC CC: Victoria Ferguson, AOGCC
aennifer hunt(Dalaska.00v victoria ferguson(&alaska.00v
From: Jennifer Blake, GPB Production Optimization Team Leader
A flaring event occurred at FS2 and was due to a planned shutdown of Tandem Compressor 1801 for maintenance.
Flaring stopped when T/C 1801 was restarted. The maintenance bridged several days. The daily volumes are as follows:
• Starting at 03/16/2015 10:00 and stopping at 03/16/2015 23:59 with a volume of 3500 (MSCF).
for 839 minutes.
The event lasted
• Starting at 03/17/2015 00:00 and stopping at 03/17/2015 23:59 with a volume of 6000 (MSCF).
for 1439 minutes.
The event lasted
• Starting at 03/18/2015 00:00 and stopping at 03/18/2015 23:59 with a volume of 6000 (MSCF).
for 1439 minutes.
The event lasted
• Starting at 03119/2015 00:00 and stopping at 03119/2015 23:59 with a volume of 6000 (MSCF).
for 1439 minutes.
The event lasted
• Starting at 03/20/2015 00:00 and stopping at 03/20/2015 23:59 with a volume of 6000 (MSCF).
for 1439 minutes.
The event lasted
• Starting at 03/21/2015 00:00 and stopping at 03/21/2015 23:59 with a volume of 6000 (MSCF).
for 1439 minutes.
The event lasted
• Starting at 03/22/2015 00:00 and stopping at 03/22/2015 23:59 with a volume of 6000 (MSCF).
for 1439 minutes.
The event lasted
• Starting at 03/23/2015 00:00 and stopping at 03/23/2015 23:59 with a volume of 6000 (MSCF).
for 1439 minutes.
The event lasted
Starting at 03/24/2015 00:00 and stopping at 03124/2015 23:59 with a volume of 6000 (MSCF).
for 1439 minutes.
The event lasted
• Starting at 03/25/2015 00:00 and stopping at 03/25/2015 23:59 with a volume of 6000 (MSCF).
for 1439 minutes.
The event lasted
• Starting at 03/26/2015 00:00 and stopping at 03126/2015 23:59 with a volume of 6000 (MSCF).
for 1439 minutes.
The event lasted
• Starting at 03/27/2015 00:00 and stopping at 03/27/2015 23:59 with a volume of 6000 (MSCF).
for 1439 minutes.
The event lasted
• Starting at 03/28/2015 00:00 and stopping at 03/28/2015 23:59 with a volume of 6000 (MSCF).
for 1439 minutes.
The event lasted
• Starting at 03/29/2015 00:00 and stopping at 03/29/2015 23:59 with a volume of 6000 (MSCF).
for 1439 minutes.
The event lasted
• Starting at 03/30/2015 00:00 and stopping at 03/30/2015 23:59 with a volume of 6000 (MSCF).
for 1439 minutes.
The event lasted
• Starting at 03/31/2015 00:00 and stopping at 03/31/2015 23:59 with a volume of 6000 (MSCF).
for 1439 minutes.
The event lasted
• Starting at 04/01/2015 00:00 and stopping at 04/01/2015 23:59 with a volume of 6000 (MSCF).
for 1439 minutes.
The event lasted
• Starting at 04/02/2015 00:00 and stopping at 04/02/2015 23:59 with a volume of 6000 (MSCF).
for 1439 minutes.
The event lasted
• Starting at 04/03/2015 00:00 and stopping at 04/03/2015 11:59 with a volume of 6000 (MSCF).
for 719 minutes.
The event lasted
• Starting at 04/04/2015 00:00 and stopping at 04/04/2015 11:59 with a volume of 6000 (MSCF).
for 719 minutes
The event lasted
• Starting at 04/05/2015 00:00 and stopping at 04/05/2015 17:00 with a volume of 4957 (MSCF).
for 1020 minutes..
The event lasted
Please let me know if you have any questions.
Thanks,
Jennifer Blake
PCC/EOC Production Optimization Team Lead
Office (907) 659-4472
Cell (907) 830-6204
Jennifer.blake(@bp.com
Hunt, Jennifer L (DOA)
From: AK, OPS PCC EOC TL <AKOPSPCCEOCTL@bp.com>
Sent: Tuesday, March 24, 2015 10:32 AM
To: Hunt, Jennifer L (DOA)
Cc: Loepp, Victoria T (DOA); Castano, Alejandra; Benson, Gary A; Arthur, Gregory; AK, HSSEE
Env Adv East; Loader, Neil; AK, OPS GPMA Facility OTL; AK, OPS GPMA OSM; AK, HSSEE
Env Adv West; AK, OPS GC3&PCC OSM
Subject: RE: Gas flaring events at FSI, FS2, GC3
To: Jennifer Hunt, AOGCC CC: Victoria Ferguson, AOGCC
Jennifer hunti
ie
Certified Mail: 7011 2970 0001 9243 3470
March 9, 2015
Commissioner Catherine Foerster
State of Alaska
Alaska Oil and Gas Conservation Commission
333 West 7h Ave., Ste. 100
Anchorage, AK 99501-3539
1*1
BP Exploration (Alaska) Inc.
900 East Benson Boulevard
P.O. Box 196612
Anchorage, Alaska 99519.6612
(907) 561-5111
MAR 10 2015
Subject: Notification of Potential Elevated Flaring at Flow Station 2
Dear Commissioner Foerster:
BP Exploration (Alaska) Inc. (BPXA), as operator of the Greater Prudhoe Bay (GPB) Unit, is
writing to notify The Alaska Oil and Gas Conservation Commission (AOGCC) of elevated
flaring at Flow Station 2 (FS -2). The flaring will occur as part of a project to replace the
compressor seals on the Stock Tank Vapor - Intermediate Pressure (STV -IP) compressor.
Flaring the STV -IP gas stream will be necessary to maintain stable facility operations at FS -2
during the compressor seal replacement. The only other alternative to flaring would be to shut
down major equipment and operations at FS -2, which would introduce process and operational
risks during the shutdown and start-up. In addition, shutdown and start-up of the facilities
requires extensive use of the flare system, which would result in more gas being flared than
would otherwise occur during the limited flaring that is scheduled to take place during this
maintenance work.
The GPB Flow Stations 1, 2, and 3, were each originally configured with two STV -IP
compressor trains, one running and one on standby, each powered by a Dresser-Rand GT51
power turbine driven by a GE -LM -1500 gas generator. The STV -IP compressors were originally
placed into service in the mid-1970s and were designed to handle 15 and 54 MMSCFD of STV
and IP gases, respectively, and to boost the gas pressure from 15.2 to 675 psia. Due to field
production decline, the STV -IP compressors are a poor fit for their current process conditions.
As compared to when they were first put into service, the STV compressors are receiving a 69%
lower flow rate of gas with a 12% lower molecular weight. The IP compressor is receiving an
80% lower flow with an 8% lower molecular weight. It is predicted that gas flow rate and
molecular weight will continue to decrease over time.
RECEIVED
STATE OF ALASKA MAY 14 2015
ALASKA OIL AND GAS CONSERVATION COMMISSION AOGCC
FACILITY REPORT OF PRODUCED GAS DISPOSITION V
1. Facility Number
0290000029
2. Facility Name
PBU FS 2
3. Field
PBU - ECA
4. Operator
BP
5. Month/Year of Disposition
I Aril -2015
Disposition
Volume MCF
20. For production from multiple pools, list contribution of each pool as a percent of
Total Volume.
6. Sold
Pool Name PoolCode Percent
7. Reinjected
O
PRUDHOE 640150 100.00%
8. Flared or vented l hour or less
28,957
9. Flared or vented more than 1 hour (see instr.)
0
10. Pilot and Purge
11,927
11. Assist Gas
58,045
12. Fuel gas used in lease operations.
699,002
13. Other (see instructions)
0
Official Use Only
Authorization>1 hr:
Safety
f
Z8 iJ
MCF
14. TOTAL VOLUME (ITEMS 6-12)
797,931
Lease Use
MCF
15. NGL Gas Equivalent
0
Conservation
MCF
16. Purchased gas
0
Waste:
MCF
17. Transferred from: CGF
274,154
`/- Z _ r
Commissioner Date
18. Transferred to: (Express as a negative #) CGF
-19,645,285
19. Remarks:
I hereby certify that t e foregoing is true and correct to the best of my knowledge.
////�'���,,((n//��///nn/�/J,, Note: All volumes must be corrected
Signature ,80cYX�,�'' Title Manager Production Taxes and Ro alties Alaska to pressure of 14.65 psis and to a
i temperature of 60o F. Authority 20
Printed Name Diane Colley Phone (907) 564-5775 Date AAC25.235.
Form 10422 Rev. 5/2009 INSTRUCTIONS ON REVERSE SIDE Submit in Duplicate
Flare StartDate 04/01/2015 RECEIVED
Flare End Date 04/30/2015
MAY 14 2015
FS2 Flare Report Total Volume (MSCF) 28957
Report
Numbs System Date Start Time Stop Time Duration Intermittent Black Smoke Planned Reported By Volume
15-90 Controlled Blowdown 04/01/2015 12:00:00 am 11:59:00 pm 1439 min No No
Yes BP1\BOOKAP
6000
Determination Cause
-RC 1801 shutdown for planned maintenance
Action Taken
Completed depressunng T/C 1801 for planned maintenance and floating on flare
Daily Volume (MSCF)
6000
15-91 Controlled Blowdown 04/02/2015 12:00:00 am 11:59:00 pm 1439 min No No
Yes BP1\BOOKAP
6000
Determination Cause
T\C 1801 shutdown for planned maintenance
Action Taken
Completed depressunng T/C 1801 for planned maintenance and floating on flare.
Daily Volume (MSCF)
6000
15-93 Controlled Blowdown 04/03/2015 12:00:00 am 115900 am 719 min No No
Yes BP1\BOOKAP
6000
Determination Cause
T\C 1801 Shutdown for planned maintenance.
Action Taken
Completed depressunng T/C 1801 for planned maintenance and floating on flare
Daily Volume (MSCF)
6000
15-94 Controlled Blowdown 04/04/2015 12:00:00 am 11:59:00 am 719 min No No
Yes BP1\1300KAP
6000
Determination Cause
T\C 1801 shutdown for planned maintenance
Action Taken
Completed depressunng of 1801 for seal changeout and is floating on flare.
Daily Volume (MSCF)
6000
,
15-98 Flare Relief 04/05/2015 12:00:00 am 5:00:00 pm 1020 min No No
Yes MMOOKAP
4957
Determination Cause
'RC 1801 shutdown for planned maintenance
Action Taken
Completed depressunng 1801 floating on flare for seal replacement
Daily Volume (MSCF)
4957 .
Total Volume (MSCF)
28957
Generated 05/08/2015 4:16:54PM Page 6 of 10
From: AK, OPS PCC EOC TL rmailto:AKOPSPCCEOCTLL&tip.com]
Sent: Monday, November 02, 2015 2:55 PM
To: Loepp, Victoria T (DOA)
Subject: RE: PBU Flaring Events
Victoria,
I have added the comments you requested below for each line.
Thank You
David Spall (Alternate —Jennifer Blake)
PCC/EOC Production Optimization Team Lead
907-659-4472 Office
219-689-4036 Cell
david.spall@bp.com
From: Loepp, Victoria T (DOA) [mailto:victoria.loel)l)@alaska gov]
Sent: Wednesday, October 21, 2015 1:58 PM
To: AK, OPS PCC EOC TL
Subject: RE: PBU Flaring Events
See additional events:
From: Loepp, Victoria T (DOA)
Sent: Wednesday, October 21, 2015 1:51 PM
To: AK, OPS PCC EOC TL (AKOPSPCCEOCTL(fbbp.com)
Subject: PBU Flaring Events
In reference to the following events:
Facility Dates Amt Flared, MSCFD Reason
1. FS -3 5/26-5/28/15 16226 Planned 1802 T/C down, flaring STV
and IP gas Issues with the machine, blew it down, they struggled with several additional restarts
and finally got 1802 to restart.
2. CGF 4/1/15 48066 Unplanned 1805 T/C down, stabilizers
overpressure to flare This was an unplanned issue and they flared to stabilize the plant, they
were able to reload 1805 and get the plant stabilized to stop the flaring.
3. FS -2 4/1-4/5/15 28957 Planned 1801 T/C shutdown for
planned maintenance This was planned maintenance and to keep the plant from going
completely down during the colder temperatures they had to flare
4. FS -1 8/25/15 18944 Unplanned 1803 T/C shutdown, 2nd
stage nozzles There was problem associated with 2 n stage nozzle/clevis slop (2%) they Shut in
wells 2-8, 2-34, 2-19, 2-21, 18-11, 2-6, 2-28, 2-22 to stop the flaring.
5. CGF 8/25/15 35569 Unplanned Flared stabilizer overhead
after TAPS outage, Low rate issues coming out of the TAPS outage, They were able to start the
MI Machine which closed the flare valves.
For each event, explain what happened and what measures were taken to mitigate flaring such as shut
in production. If production was not shut in, why not?
Thanx,
Victoria
Victoria Loepp
Senior Petroleum Engineer
State of Alaska
Oil & Gas Conservation Commission
STATE OF ALASKA
ALASKA OIL AND GAS CONSERVATION COMMISSION
FACILITY REPORT OF PRODUCED GAS DISPOSITION
RECEIVED
JUN 16 Z015
AOGCC
1. Facility Number
0290000029
2. Facility Name
PBU FS 2
3. Field
PBU - EOA
4. Operator
BP
5. MonthNear of Disposition
May -2015
Disposition
Volume MCF
20. For production from multiple pools, list contribution of each pool as a percent of
Total Volume.
6. Sold
0
Pool Name Pool Code Percent
7. Reinjected
U
PRUDHOE 640150 100.00%
8. Flared or vented 1 hour or less
0
9. Flared or vented more than 1 hour (see instr.)
550
10. Pilot and Purge
12,699
11, Assist Gas
11,671
12. Fuel gas used in lease operations.
706,656
13. Other (see instructions)
0
Official Use Only
Authorization -1 hr.
Safety
MCF
14. TOTAL VOLUME (ITEMS 6-12)
731,576
Lease Use
MCF
15. NGL Gas Equivalent
0
Conservation
MCF
16. Purchased gas
0
Waste:
MCF
17. Transferred from: CGF
288,980
7� I ,/ --3O IS—18.
Transferred to: (Express as a negative #) CGF
-21,062,277
Commissioner Date
19. Remarks:
I hereby certify that the foregoing is true and correct to the best of my knowledge.
II�NVt %in/J/J�l Note: All volumes must be corrected
Signature Title Manager Production Taxes and Royalties Alaska to pressure of 14.65 psia and to a
temperature of 600 F. Authority 20
Printed Name Diane Colley Phone (907) 564-5775 Date AAC25.235.
-f/Z-//5
Form 10-422 Rev. W009 INSTRUCTIONS ON REVERSE SIDE Submit in Duplicate
BP EXPLORATION (ALASKA) INC.
PRUDHOE BAY UNIT- FS -2
GAS FLARING INCIDENT REPORT
May 2015
or equal to 1 hour
RECEIVED
JUN pp16 200155
rp;0000
WA t IIMe VOLUME DESCRIPTION OF INCIDENT & CAUSE ACTION TAKEN TO ELIMINATE CAUSE
Not required for unplanned events <= 1 hr Not required for unplanned events <= 1 hr
TOTAL 0
Unplanned Events greater than 1 hour
DESCRIPTION OF INCIDENT &
See attachments
See attachments
CAUSE
TOTAL 0
Planned Events Less Than or Equal 1 Hour AND <= 5,000 mcf
DATE TIME VOLUME DESCRIPTION OF INCIDENT & CAUSE ACTION TAKEN TO ELIMINATE CAUSE
See attachments See attachments
TOTAL 0
Planned Events Exceeding 1 Hour OR > 5,000 mcf
DATE TIME VOLUME DESCRIPTION OF INCIDENT & CAUSE ACTION TAKEN TO ELIMINATE CAUSE
5/17/2015 1815-2115 550 See attachments See attachments
TOTAL 550
Page 6
6/12/2015
10:03 AM
TOTAL
Unplanned Events < 1 Hour
0
Unplanned Events> 1 Hour
0
Planned Events < 1 hour and not
0
exceeding 5,000 MCF
Planned Events > 1 hour or
550
exceeding 5,000 MCF
Pilot Purge
12,699
Assist
11,671
TOTAL FLARED VOLUME
24,920
Page 6
6/12/2015
10:03 AM
Flare Start Date 05/01/2015
Flare End Date 05/31/2015
FS2 Flare Report Total Volume (MSCF) 550
Report
Numbe
System
Date Start Time Stop Time Duration Intermittent Black Smoke Planned
Reported By Volume
15-144
Controlled Blowdown 05/17/2015 6:15'.00 pm 9'.15:00 pm 180 min No No Yes
13P1WITCHE13 550
Determination
Cause
Shut in and depressured 1fiD common line and
A/L as a proactive measure due to flooding concerns
Action Taken Completed depressunng and floating on flare.
Daily Volume (MSCF) 550
Total Volume (MSCF) 550
JUN 16 2015
AOGCC
Generated 06/08/2015 8:53'.39AM Page 5 of 10
STATE OF ALASKA
ALASKA OIL AND GAS CONSERVATION COMMISSION
FACILITY REPORT OF PRODUCED GAS DISPOSITION
1. Facility Number
0290000029
2. Facility Name
PBU FS 2
3. Field
PBU - EOA
4. Operator
BP
5. MonthNear of Disposition
I June -2015
Disposition
Volume MCF
20. For production from multiple pools, list contribution of each pool as a percent of
Total Volume.
6. Sold
0
Pool Name PoolCode Percent
7. Reinjected
O
PRUDHOE 640150 10o.003/—. --
0o.00%
8.
8. Flared or vented l hour or less
1,060
9. Flared or vented more than 1 hour (see instr.)
10,882
10. Pilot and Purge
12,715
11. Assist Gas
21,695
12. Fuel gas used in lease operations.
547,954
13. Other (see instructions)
0
Official Use Only
Authorization >1 he
Safetya
/0 �O �
MCF
14. TOTAL VOLUME (ITEMS 6-12)
594,306
Lease Use
MCF
15. NGL Gas Equivalent
0
Conservation
MCF
16. Purchased gas
0
Waste:
MCF
17. Transferred from: CGF
223,861
. / q -2-1y
•`/
Commissioner-tDate
18. Transferred to: (Express as a negative #) CGF
-17,745,648
19. Remarks:
1 hereby certify that the foregoing is true and correct to the best of my knowledge.
/n/�{-�� /�t/f/f A Note: All volumes must be corrected
Signature CG% K (,�(�y /,�/% Title Mana er Production Taxes and Royalties Alaska to pressure of 14.65 psis and to a
7 temperature of 60o F. Authority 20
Printed Name Diane ColleyPhone (9117) 564-5775 Date AAC25.235.
vIt—
e!z/r>
Form 10-422 Rev. 5/2009 INSTRUCTIONS ON REVERSE SIDE Submit in Duplicate
BP EXPLORATION (ALASKA) INC. Page 7
PRUDHOE BAY UNIT - FS -2
GAS FLARING INCIDENT REPORT
June 2015
Unplanned Events less than or equal to 1 hour
DATE
TIME
VOLUME DESCRIPTION OF INCIDENT& CAUSE ACTION TAKEN TO ELIMINATE CAUSE
6/13/2015
2000-2021
231 Not required for unplanned events <= 1 hr Not required for unplanned events <= 1 hr
6/14/2015
1010-1040
100
6/23/2015
0604-0612
20
6/29/2015
1520-1600
389
6/29/2015
1825-1847
61
6/29/2015
2115-2138
64
6/29/2015
2226-2303
103
6/30/2015
1205-1224
92
TOTAL
TOTAL
1,060
UAI E
TIME
VOLUME DESCRIPTION OF INCIDENT & CAUSE ACTION TAKEN TO E
6/10/2015
1905-2020
470 See attachments See attachments
6/14/2015
1600-1900
500
6/17/2015
2000-2200
448
6/18/2015
0604-1630
2,610
6/22/2015
1347-1451
330
6/29/2015
0858-1012
359
6/29/2015
1122-1350
719
6/29/2015
1928-2047
439
TOTAL
5,875
LPlanned Events Less Than or Equal 1 Hour AND <= 5,000 mcf
See attachments See attachments
TOTAL 0
7/15/2015
3:53 PM
BP EXPLORATION (ALASKA) INC.
PRUDHOE BAY UNIT - FS -2
GAS FLARING INCIDENT REPORT
June 2015
Planned Events Exceeding 1 Hour OR > 5,000 mcf
DATE TIME VOLUME DESCRIPTION OF INCIDENT & CAUSE ACTION TAKEN TO ELIMINATE CAUSE
6/3/2015 1621-1745 1,100 See attachments See attachments
6/5/2015 1008-1140 539
6/10/2015 0437-1610 3,368
TOTAL 5,007
Unplanned Events < 1 Hour
Unplanned Events> 1 Hour
Planned Events < 1 hour and not
exceeding 5,000 MCF
Planned Events > 1 hour or
exceeding 5,000 MCF
Pilot Purge
Assist
TOTAL FLARED VOLUME
TOTAL
1,060
5,875
0
5,007 ,
12,715
21,695
46,352
Page 8
7/15/2015
3:53 PM
Flare StartDate 05/01/2015
Flare End Date 06/30/2015
FS2 Flare Report Total Volume (MSCF) 11942
Report
Determination Cause
LIPS T\C 1801 shutdown because of a problem associated with high CCP header pressure.
Action Taken
Loaded STWIP T/C.
Numbe System
Date Start Time Stop Time
Duration Intermittent
Black Smoke Planned Reported By
Volume
15-171 Other
06/03/2015 4:21:00 pm 5:45:00 pm
84 min No
No Yes BP1\STRACB
1100
Determination Cause
TIC 1803 spin cooling during waterwash crank.
Action Taken
Instrumentation found and repaired issue, TIC restarted.
Action Taken
Completed spin cooling. Water wash complete.
Daily Volume (MSCF)
1100
15-172 Other
06/05/2015 1008:00 am 11:40:00 am
92 min No
No Yes BP1\STRACS
539
Determination Cause
T\C 1804 spin cooling during water wash.
Action Taken
Completed spin cooling.
Daily Volume (MSCF)
539
15-181 Controlled Blowdown 06/10/2015 4:37:00 am 4:10:00 pm
693 min No
No Yes BP1\MITCHEB
3368
Determination Cause
T\C 1801 shutdown for planned maintenance
Action Taken
Loaded STV/IP T/C after planned borescope.
15-181 Controlled Slowdown 06/10/2015 7:05:00 pm 8:20:00 pm 75 min No No No BP1\WOLCJO 470
Determination Cause STV -IP T\C 1801 shutdown due to a problem associated with High Field pressure to CCP.
Action Taken Loaded STV/IP T/C.
Daily Volume (MSCF) 3838
15-191 Controlled Blowdown 06/14/2015 4:00:00 pm 7:00:00 pm 180 min Yes No
Determination Cause
LIPS T\C 1801 shutdown because of a problem associated with high CCP header pressure.
Action Taken
Loaded STWIP T/C.
15-194 Controlled Blowdown 06/17/2015 8:00:00 pm 10:00:00 pm 120 min No No
Determination Cause
De -pressured C/L 16D while DS is S/D.
Action Taken
Completed de -pressuring.
15-195 Other
06/18/2015 60400 am 4:30:00 pm 626 min No No
Determination Cause
Lost 1801 T/C on instrumentation issue - recycle block valve limit switch issue
Action Taken
Instrumentation found and repaired issue, TIC restarted.
No BP1\WOLCJO 500
Daily Volume (MSCF) 600
No BP1\RALPHJM 448
Daily Volume (MSCF) 448
No BP1\RALPHJM 2610
Daily Volume (MSCF) 2610
15-201 Other 06/22/2015 1:47:00 pm 2:51:00 pm 64 min No No No BPI\RALPHJM 330
Determination Cause Depressured 17D C/L for UR tie-in work.
Action Taken Completed depressuring of the line.
Daily Volume (MSCF) 330
Generated 07/02/2015 3:52:31 PM Page 6 of 12
Flare Start Date 06/01/2015
Flare End Date 06/30/2015
T/C 1801 lost its bite on the STV compressor and eared off the COSD.
15-219 Flare Relief 06/29/2015 8:58:00 am 10:12:00 am 74 min No
Determination Cause 1801 shutdown due to high IP discharge temperature.
Action Taken Loaded 1801 back into the system.
15-219 Flare Relief 06/29/2015 11:22:00 am 1:50:00 pm 148 min No
Determination Cause Shutdown due to high IP discharge temp.
Action Taken Started and reloaded 1801
15-219 Flare Relief 06/29/2015 7:28:00 pm 8:47:00 pm 79 min
Determination Cause Lost T/C 1801 on high IP discharge temperature
Action Taken Re -started T/C 1801 and worked back into the system.
No
No No
No No
No No
BP1\STRAC8 359
BPI\STRACB 719
BP1\RALPHJM 439
Total Volume (MSCF) 11942
Generated 07/02/2015 3:52:31 PM Page 7 of 12
Hunt, Jennifer L (DOA)
From: AK, OPS PCC EOC TL <AKOPSPCCEOCTL@bp.com>
Sent: Wednesday, June 03, 2015 5:21 AM
To: Hunt, Jennifer L (DOA)
Cc: Loepp, Victoria T (DOA); Castano, Alejandra; Benson, Gary A; Arthur, Gregory; AK, HSSEE
Env Adv West; Fortenberry, Christopher; AK, OPS GC3&PCC OSM; Loepp, Victoria T
(DOA); AK, OPS FS2 Facility OTL; AK, OPS FS2 OSM; AK, HSSEE Env Adv East
Subject: Gas flaring event at FS2
To: Jennifer Hunt, AOGCC CC: Victoria Ferguson, AOGCC
ien n iter. hunt(o)a laska. oov victoria. ferpuson C )a laska. oov
From: David Spall, GPB Production Optimization Team Leader
A flaring event occurred at FS2 starting at 06/02/2015 01:00 and stopping at 06/02/2015 03:00 with a volume of 583
(MSCF). The event lasted for 120 minutes and was due to T/C 1803 shutdown for water wash and maintenance. The
event stopped when spin cooling and de -pressuring was complete.
Thanks,
David Spall (Alternate —Jennifer Blake)
PCC/EOC Production Optimization Team Lead
907-659-4472 Office
219-689-4036 Cell
david.spall@bp.com
Hunt, Jennifer L (DOA)
From: AK, OPS PCC EOC TL <AKOPSPCCEOCTL@bp.com>
Sent: Friday, June 05, 2015 10:13 AM
To: Hunt, Jennifer L (DOA)
Cc: Loepp, Victoria T (DOA); Castano, Alejandra; Benson, Gary A; Arthur, Gregory; AK, HSSEE
Env Adv West; Fortenberry, Christopher; AK, OPS GC3&PCC OSM; Loepp, Victoria T
(DOA); AK, OPS FS2 Facility OTL; AK, OPS FS2 OSM; AK, HSSEE Env Adv East
Subject: Gas flaring event at
To: Jennifer Hunt, AOGCC CC: Victoria Ferguson, AOGCC
a ennifer.huntCo)alaska.gov victoria.ferguson(o2alaska.gov
From: David Spall, GPB Production Optimization Team Leader
A flaring event occurred at FS2 starting at 06/03/2015 16:21 and stopping at 06/03/2015 17:45 with a volume of 1100
(MSCF). The event lasted for 84 minutes and was due to T/C 1803 shutdown for water wash. The event stopped when
spin cooling and water wash was complete.
Thanks,
Dave
David Spall (Alternate —Jennifer Blake)
PCC/EOC Production Optimization Team Lead
907-659-4472 Office
219-689-4036 Cell
david.spall@bp.com
Hunt, Jennifer L (DOA)
From: AK, OPS PCC EOC TL <AKOPSPCCEOCTL@bp.com>
Sent: Saturday, June 06, 2015 8:58 AM
To: Hunt, Jennifer L (DOA)
Cc: Loepp, Victoria T (DOA); Castano, Alejandra; Benson, Gary A; Arthur, Gregory; AK, HSSEE
Env Adv West; Fortenberry, Christopher; AK, OPS GC3&PCC OSM; Loepp, Victoria T
(DOA); AK, OPS FS2 Facility OTL; AK, OPS FS2 OSM; AK, HSSEE Env Adv East
Subject: Gas flaring event at FS2
To. Jennifer Hunt, AOGCC CC: Victoria Ferguson, AOGCC
iennifer.hunt(a)alaska.gov victoria.ferouson(')a alaska.00v
From: David Spall, GPB Production Optimization Team Leader
A flaring event occurred at FS2 starting at 06/05/2015 10:08 and stopping at 06/05/2015 11:40 with a volume of 539
(MSCF). The event lasted for 92 minutes and was due to T/C 1804 spin cooling for water wash. The event stopped when
spin cooling was completed.
Thanks,
Dave
David Spall (Alternate —Jennifer Blake)
PCC/EOC Production Optimization Team Lead
907-659-4472 Office
219-689-4036 Cell
david.spall@bp.com
Hunt, Jennifer L (DOA)
From:
AK, OPS PCC EOC TL <AKOPSPCCEOCTL@bp.com>
Sent:
Friday, June 12, 2015 1:24 PM
To:
Hunt, Jennifer L (DOA)
Cc:
Loepp, Victoria T (DOA); Castano, Alejandra; Benson, Gary A; Arthur, Gregory; AK, OPS
GC3&PCC OSM; Borton, Kim; AK, HSSEE Env Adv East; AK, OPS FS2 Facility OTL; AK, OPS
FS2 OSM
Subject:
Flaring Event at FS2 .I
To: Jennifer Hunt, AOGCC CC: Victoria Loepp, AOGCC
iennifer.hunt(c)alaska.00v Victoria. loepp(a)alaska.gov
From: David Spall, GPB Production Optimization Team Leader
A flaring event occurred at FS2 starting at 06/10/2015 04:37 and stopping at 06/10/2015 16:10 with a volume of 3368
(MSCF). The event lasted for 693 minutes and was due T\C 1801 shutdown for planned maintenance. The event stopped
when the planned maintenance was completed.
A flaring event occurred at FS2 starting at 06/10/2015 19:05 and stopping at 06/10/2015 20:20 with a volume of 470
(MSCF). The event lasted for 75 minutes and was due T\C 1801 shutdown due to a problem associated with pressure at
CCP. The event stopped when T\C 1801 was loaded again..
Thanks
Dave
David Spall (Alternate —Jennifer Blake)
PCC/EOC Production Optimization Team Lead
907-659-4472 Office
219-689-4036 Cell
david.spall@bp.com
Hunt, Jennifer L (DOA)
From:
AK, OPS PCC EOC TL <AKOPSPCCEOCTL@bp.com>
Sent:
Monday, June 15, 2015 6:04 PM
To:
Hunt, Jennifer L (DOA)
Cc:
Loepp, Victoria T (DOA); Castano, Alejandra; Benson, Gary A; Arthur, Gregory; AK, OPS
GC3&PCC OSM; Borton, Kim; AK, HSSEE Env Adv East; AK, OPS FS2 Facility OTL; AK, OPS
FS2 OSM
Subject:
Flaring Event a
To: Jennifer Hunt, AOGCC CC: Victoria Loepp, AOGCC
iennifer.hunt(o)alaska.00v Victoria.loeppC@alaska.gov
From: David Spall, GPB Production Optimization Team Leader
A flaring event occurred at FS2 starting at 06/14/2015 16:00 and stopping at 06/14/2015 19:00 with a volume of 500
(MSCF). The event lasted for 180 minutes and was due T\C 1801 shutdown because of problem associated with high
CCP header Pressure. The event stopped when STV/IP T?C 1801 was loaded.
Thanks
Dave
David Spall (Alternate —Jennifer Blake)
PCC/EOC Production Optimization Team Lead
907-659-4472 Office
219-689-4036 Cell
david.spall@bp.com
Hunt, Jennifer L (DOA)
From: AK, OPS PCC EOC TL <AKOPSPCCEOCTL@bp.com>
Sent: Friday, June 26, 2015 8:06 AM
To: Hunt, Jennifer L (DOA)
Cc: Loepp, Victoria T (DOA); Castano, Alejandra; Benson, Gary A; Arthur, Gregory; AK, OPS
GC3&PCC OSM; Martin, Nelson D; AK, HSSEE Env Adv East; AK, OPS FS2 Facility OTL; AK,
OPS FS2 OSM
Subject: Flaring Event at FS2
To: Jennifer Hunt, AOGCC CC: Victoria Loepp, AOGCC
Lennifer hunt(o)alaska.gov Victoria Ioepp(calaska.cov
From: Jennifer Blake, GPB Production Optimization Team Leader
A flaring event occurred at FS2 starting at 06/17/2015 20:00 and stopping at 06/17/2015 22:00 with a volume of 448
(MSCF). The event lasted for 120 minutes and was due to depressurizing common line 16D. The event stopped when
depressurizing was complete.
A flaring event occurred at FS2 starting at 06/18/2015 06:04 and stopping at 06/18/2015 16:30 with a volume of 2610
(MSCF). The event lasted for 626 minutes and was due to Tandem Compressor 1801 tripping due to instrumentation
issue on the recycle block valve limit switch. The event stopped when instrumentation repaired the issue and the
compressor was restarted.
A flaring event occurred at FS2 starting at 06/22/2015 13:47 and stopping at 06/22/2015 14:51 with a volume of 330
(MSCF). The event lasted for 64 minutes and was due to depressurizing common line 17D for tie-in work. The event
stopped when depressurizing was complete.
Thanks,
Jennifer Blake
PCC/EOC Production Optimization Team Lead (alt David Spall)
Office (907) 659-4472
Cell (907) 830-6204
lennifer.blake@bp.com
Hunt, Jennifer L (DOA)
From: AK, OPS PCC EOC TL <AKOPSPCCEOCTL@bp.com>
Sent: Tuesday, June 30, 2015 8:41 AM
To: Hunt, Jennifer L (DOA)
Cc: Loepp, Victoria T (DOA); Castano, Alejandra; Benson, Gary A; Arthur, Gregory; AK, OPS
GC3&PCC OSM; Martin, Nelson D; AK, HSSEE Env Adv East; AK, OPS FS2 Facility OTL; AK,
OPS FS2 OSM
Subject: Flaring Event aim
To: Jennifer Hunt, AOGCC CC: Victoria Loepp, AOGCC
ennifer hunt Malaska.00v Victoria loeppl'W.alaska.gov
From: Jennifer Blake, GPB Production Optimization Team Leader
A flaring event occurred at FS2 starting at 06/29/2015 08:58 and stopping at 06/29/2015 10:12 with a volume of 359
(MSCF). The event lasted for 74 minutes and was due T\C 1801 shutdown because of high IP discharge temperature.
The event stopped when T/C 1801 was started and reloaded.
A flaring event occurred at FS2 starting at 06/29/2015 11:22 and stopping at 06/29/2015 13:50 with a volume of 719
(MSCF). The event lasted for 148 minutes and was due T\C 1801 shutdown because of high IP discharge temperature.
The event stopped when T/C 1801 was started and reloaded.
A flaring event occurred at FS2 starting at 06/29/2015 19:28 and stopping at 06/29/2015 20:47 with a volume of 439
(MSCF). The event lasted for 79 minutes and was due T\C 1801 shutdown because of high IP discharge temperature.
The event stopped when T/C 1801 was started and reloaded.
Thanks
Jennifer Blake
PCC/EOC Production Optimization Team Lead (alt David Spall)
Office (907) 659-4472
Cell (907) 830-6204
Jennifer.blake(@bp.com
STATE OF ALASKA
ALASKA OIL AND GAS CONSERVATION COMMISSION
FACILITY REPORT OF PRODUCED GAS DISPOSITION
1. Facility Number
0290000029
2. Facility Name
PBU FS 2
3. Field
PBU - EOA
4. Operator
BP
5. MonthNear of Disposition
July -2015
Disposition
Volume MCF
20. For production from multiple pools, list contribution of each pool as a percent of
Total Volume.
6. Sold
Pool Name Pool Code Percent
7. Reinjected
O
PRUDHOE 640150 100.00%
8. Flared or vented 1 hour or less
366
9. Flared or vented more than 1 hour (see instr.)
2,969
10. Pilot and Purge
12,717
11. Assist Gas
68
12. Fuel gas used in lease operations.
659,756
13. Other (see instructions)
0
Official Use Only
Authorization >l hr:
Safety
Z R /a G7
1
MCF
14. TOTAL VOLUME (ITEMS 6.12)
675,876
Lease Use
MCF
15. NGL Gas Equivalent
0
Conservation
MCF
16. Purchased gas
0MCF
Waste:
17. Transferred from: CGF
260,814
/ 9
Commissioner Date
18. Transferred to: (Express as a negative #) CGF
-24,326,203
19. Remarks:
I hereby certify that t e foregoing is true and correct to the best of my knowledge.
iINote: All volumes must be corrected
Signature &M1' Title Mana er Production Taxes and Ro alties Alaska to pressure of 14.65 psia and to a
{' r✓� temperature of 60o F. Authority 20
Printed Name Diane ColleyPhone (907) 564-5775 Date / AAC25.235.
V7-L-
'71--115-
Form
Tt_4/z/!,-
Form 10422 Rev. 5/2009 INSTRUCTIONS ON REVERSE SIDE Submit in Duplicate
Events less than or
TIME
TOTAL
to
Ell
BP EXPLORATION (ALASKA) INC.
PRUDHOE BAY UNIT- FS -2
GAS FLARING INCIDENT REPORT
July 2015
Not required for unplanned events <= 1 hr
See attachments
Not required for unplanned events <= 1 hr
ACTION TAKEN TO E
See attachments
TOTAL 0
Planned Events Less Than or Equal 1 Hour AND <= 5,000 mcf
DATE TIME VOLUME DESCRIPTION OF INCIDENT & CAUSE ACTION TAKEN TO ELIMINATE CAUSE
7/10/2015 1150-1246 366 See attachments See attachments
TOTAL 366
7/2/2015
7/6/2015
7/10/2015
1426-2359
0753-1343
1958-2100
TOTAL
Unplanned Events < 1 Hour
Unplanned Events > 1 Hour
Planned Events < 1 hour and not
exceeding 5,000 MCF
Planned Events > 1 hour or
exceeding 5,000 MCF
Pilot Purge
Assist
TOTAL FLARED VOLUME
365 See attachments
2,238
366
2,969
TOTAL
0
0
366
2,969
12,717
68
16,120
See attachments
Page 5
8/16/2015
5:37 PM
Flare Start Date 07/01/2015
Flare End Date 07/31/2015
FS2 Flare Report
Total Volume (MSCF) 3335
Report
Numbe System Date StartTime Stop Time Duration Intermittent Black Smoke Planned Reported By Volume
15-228
Flare Relief 07/02/2015 2:26:00 pm 11:59:00 pm 573 min No No
Yes BPI\LALAJR
365
Determination Cause 17 D shutdown for Decomissioning
Action Taken
Completed depressuring.
Daily Volume (MSCF)
365
15-236
Flare Relief 07/06/2015 7:53:00 am 1:43:00 pm 350 min No No
Yes BP1\LALAJR
2238
Determination Cause DE pressured 16-D and DS16 MI for pipeline renewal shutdown for planned maintenance.
Action Taken
Completed depressunng.
Daily Volume (MSCF)
2238
15-237
Flare Relief 07/10/2015 11:50:00 am 12:46:00 pm 56 min No No
Yes BP1\REIMBT
366
Determination Cause While Leak testing 16"D" Common Line after Pig Launchers/Receiver installation, one of the 8"
bypass Flanges on the DS end started
leaking. We depressured the line to flare so the flange could be re -torqued.
Action Taken
Completed depressunng.
15-237
Flare Relief 07/10/2015 7:58:00 pm 9:00:00 pm 62 min No No
Yes MM CHEB
366
Determination Cause Depnewured 16D common line to verify torque on pig launcher and launcher bypass
Action Taken Completed depressuring.
Daily Volume (MSCF) 732
Total Volume (MSCF) 3335
Generated 08/04/2015 10:48:24AM Page 6 of 8
Hunt, Jennifer L (DOA)
From: AK, OPS PCC EOC TL <AKOPSPCCEOCTL@bp.com>
Sent: Sunday, July 05, 2015 5:03 PM
To: Hunt, Jennifer L (DOA)
Cc: Loepp, Victoria T (DOA); Castano, Alejandra; Benson, Gary A; Arthur, Gregory; AK, OPS
GC3&PCC OSM; Martin, Nelson D; AK, HSSEE Env Adv East; AK, OPS FS2 Facility OTL; AK,
OPS FS2 OSM
Subject: Flaring Event at FS2
To: Jennifer Hunt, AOGCC CC: Victoria Loepp, AOGCC
jennifer.huntCa)alaska.cov Victoria. loepgna alaska.aov
From: David Spall, GPB Production Optimization Team Leader
A flaring event occurred at FS2 starting at 07/02/2015 14:26 and stopping at 07/02/2015 23:59 with a volume of 365
(MSCF). The event lasted for 573 minutes and was due to 17D shutdown for De -commissioning. The event stopped when
de -pressuring was complete..
Thanks
Dave
David Spall (Alternate —Jennifer Blake)
PCC/EOC Production Optimization Team Lead
907-659-4472 Office
219-689-4036 Cell
david.spall@bp.com
Hunt, Jennifer L (DOA)
From: AK, OPS PCC EOC TL <AKOPSPCCEOCTL@bp.com>
Sent: Tuesday, July 07, 2015 10:58 AM
To: Hunt, Jennifer L (DOA)
Cc: Loepp, Victoria T (DOA); Castano, Alejandra; Benson, Gary A; Arthur, Gregory; AK, OPS
GC3&PCC OSM; Martin, Nelson D; AK, HSSEE Env Adv East; AK, OPS FS2 Facility OTL; AK,
OPS FS2 OSM
Subject: Flaring Event at FS2
To: Jennifer Hunt, AOGCC CC: Victoria Loepp, AOGCC
iennifer.hunt(a)alaska.gov Victoria.loepp(�Dalaska. cov
From: David Spall, GPB Production Optimization Team Leader
A flaring event occurred at FS2 starting at 07/06/2015 07:53 and stopping at 07/06/2015 13:43 with a volume of 2238
(MSCF). The event lasted for 350 minutes and was due to 16D de -pressuring and DS16 MI pipeline renewal shutdown
for planned maintenance. The event stopped when de -pressuring was complete.
Thanks
Dave
David Spall (Alternate —Jennifer Blake)
PCC/EOC Production Optimization Team Lead
907-659-4472 Office
219-689-4036 Cell
david.spall@bp.com
Hunt, Jennifer L (DOA)
From: AK, OPS PCC EOC TL <AKOPSPCCEOCTL@bp.com>
Sent: Sunday, July 12, 2015 1:11 PM
To: Hunt, Jennifer L (DOA)
Cc: Loepp, Victoria T (DOA); Castano, Alejandra; Benson, Gary A; Arthur, Gregory; AK, OPS
GC3&PCC OSM; Martin, Nelson D; AK, HSSEE Env Adv East; AK, OPS FS2 Facility OTL; AK,
OPS FS2 OSM
Subject: Flaring Event at FS2
To: Jennifer Hunt, AOGCC CC: Victoria Loepp, AOGCC
jennifer.hunt(d)alaska.gov Victoria. loeppC&alaska.00v
From: David Spall, GPB Production Optimization Team Leader
A flaring event occurred at FS2 starting at 07/10/2015 19:58 and stopping at 07/10/2015 21:00 with a volume of 366
(MSCF). The event lasted for 62 minutes and was due to while leak testing 16D common -line after Pig
Launchers/Receiver installation, one of the 8" bypass flanges on the DS end started leaking. We de -pressured the line to
flare so the flange could be re -torqued. The event stopped when de -pressuring was complete.
Thanks
Dave
David Spall (Alternate—Jennifer Blake)
PCC/EOC Production Optimization Team Lead
907-659-4472 Office
219-689-4036 Cell
david.spall@bp.com
STATE OF ALASKA
ALASKA OIL AND GAS CONSERVATION COMMISSION
FACILITY REPORT OF PRODUCED GAS DISPOSITION
1. Facility Number
0290000029
2. Facility Name
PBU FS 2
3. Field
PBU - EOA
4. Operator
BP
5. MonthNear of Disposition
I August -2015
Disposition
Volume MCF
20. For production from multiple pools, list contribution of each pool as a percent of
Total Volume.
6. Sold
U
Pool Name Pool Code Percent
7. Reinjected
0
PRUDHOE 640150 100.00%
8. Flared or vented 1 hour or less
626
9. Flared or vented more than 1 hour (see instr.)
1,282
10. Pilot and Purge
12,833
11. Assist Gas
1,559
12. Fuel gas used in lease operations.
473,244
13. Other (see instructions)
0
Official Use Only
Authorization >1 hr.
Safety
Z
�BZ
MCF
14. TOTAL VOLUME (ITEMS 6.12)
489,544
Lease Use
MCF
15. NGL Gas Equivalent
0
Conservation
MCF
16. Purchased gas
U
Waste:
MCF
17. Transferred from: CGF
231,717
!
18. Transferred to: (Express as a negative #) CGF
-22,099,916
Commissioner Date
19. Remarks:
I hereby certify that the foregFing is true and correct to the best of my knowledge.
N
/1N ote: Alt volumes must be corrected
Signature (NI tL Title Marta er Production Taxes and Royalties Alaska to pressure of 14.65 psla and to a
l temperature of 60o F. Authority 20
Printed Name Diane Colley Phone (907) 564-5775 Date �L% AAC25.235.
VTL-
T/Z f// 5
Form 10-422 Rev. 512009 INSTRUCTIONS ON REVERSE SIDE Submit in Duplicate
BP EXPLORATION (ALASKA) INC.
PRUDHOE BAY UNIT- FS -2
GAS FLARING INCIDENT REPORT
August 2015
DATE
TIME
VOLUME DESCRIPTION OF INCIDENT & CAUSE ACTION TAKEN TO ELIMINATE CAVSE
8/13/2015
1733-1813
222 Not required for unplanned events <= 1 hr Not required for unplanned events <= 1 hr
8/17/2015
0912-0938
126
8/31/2015
1950-2045
278
exceeding 5,000 MCF
TOTAL
626
8/21/2015 1125-1600 532 See attachments See attachments
8/25/2015 1603-1810 750
TOTAL 1,282
Planned Events Less Than or Equal 1 Hour AND <= 5,000 mcf
DATE TIME VOLUME DESCRIPTION OF INCIDENT & CAUSE ACTION TAKEN TO ELIMINATE CAUSE
See attachments See attachments
TOTAL 0
Planned Events Exceeding 1 Hour OR > 5,000 mcf
See attachments
TOTAL 0
See attachments
Page 6
9/11/2015
10:38 AM
TOTAL
Unplanned Events < 1 Hour
626
Unplanned Events > 1 Hour
1,282
Planned Events < 1 hour and not
0
exceeding 5,000 MCF
Planned Events > 1 hour or
0
exceeding 5,000 MCF
Pilot Purge
12,833
Assist
1,559
TOTAL FLARED VOLUME
16,300
See attachments
Page 6
9/11/2015
10:38 AM
Flare Start Date 08/01/2015
Flare End Date 08/31/2015
FS2 Flare Report Total Volume (MSCF) 1908
Report
Numbe System Date StartTime Stop Time Duration Intermittent Black Smoke Planned Reported By Volume
15-276 Flare Relief 08/21/2015 11:25.00 am 4:00:00 pm 275 min No No No BPi \RALPHJM 532
Determination Cause De -pressure C/Ls 9A and 9E for valve change out work at the Drill Site.
Action Taken Completed de -pressuring, Float lines on Flare.
Daily Volume (MSCF) 532
15-282 Flare Relief 08/25/2015 4:03:00 pm 6:10:00 pm 127 min No No No BP1\LALAJR 750
Determination Cause LPS T\C 1801 shutdown because of a high IP discharge temp.
Action Taken Re -started T/C 1801.
Daily Volume (MSCF) 750
Total Volume (MSCF) 1908
Generated 09/02/2015 9:47:02AM Page 6 of 10
Hunt, Jennifer L (DOA)
From: AK, OPS PCC EOC TL <AKOPSPCCEOCTL@bp.com>
Sent: Sunday, August 23, 2015 5:03 PM
To: Hunt, Jennifer L (DOA)
Cc: Loepp, Victoria T (DOA); Glover, Robin (SLR); Benson, Gary A; Arthur, Gregory; AK, OPS
GC3&PCC OSM; Martin, Nelson D; AK, HSSEE Env Adv East; AK, OPS FS2 Facility OTL; AK,
OPS FS2 OSM
Subject: Flaring Event at FS2
To: Jennifer Hunt, AOGCC CC: Victoria Loepp, AOGCC
iennifer.hunt(c)alaska.aov Victoria. Ioeop(d)alaska.gov
From: Jennifer Blake, GPB Production Optimization Team Leader
A flaring event occurred at FS2 starting at 08/21/2015 11:25 and stopping at 08/21/2015 16:00 with a volume of 532
(MSCF). The event lasted for 275 minutes and was due to depressurizing Common Lines 9A and 9E for valve change out
work. The Flaring stopped when the depressurizing was completed.
Thanks,
Jennifer Blake
PCC/EOC Production Optimization Team Lead (alt David Spall)
Office (907) 659-4472
Cell (907) 830-6204
lennifer.blake@bp.com
STATE OF ALASKA
ALASKA OIL AND GAS CONSERVATION COMMISSION
FACILITY REPORT OF PRODUCED GAS DISPOSITION
1. Facility Number
0290000029
2. Facility Name
PBU FS 2
3. Field
PBU - EOA
4. Operator
BP
5. Month/Year of Disposition
I September -2015
Disposition
Volume MCF
20. For production from multiple pools, list contribution of each pool as a percent of
Total Volume.
6. Sold
D
Pool Name Pool Code Percent
7. Reinjected
O
PRUDHOE 640150 100.00%
8. Flared or vented 1 hour or less
1,715
9. Flared or vented more than 1 hour (see instr.)
9,549
10. Pilot and Purge
12,384
11. Assist Gas
10,698
12. Fuel gas used in lease operations.
497,343
13. Other (see instructions)
0
Official Use Only
Authorization >1 hr:
Safety
MCF
14. TOTAL VOLUME (ITEMS 6.12)
531,689
Lease Use
MCF
15. NGL Gas Equivalent
0
Conservation
MCF
16. Purchased gas
0
Waste:
MCF
17. Transferred from: CGF
229,232
[ J
Comissioner Date
18. Transferred to: (Express as a negative #) CGF
-15,171,526
19. Remarks:
I hereby certify that the foregoing is true and correct to the best of my knowledge.
/ {fin Note: All volumes must corrected
Signature IN /f �', Title Manager Production Taxes and Ro allies Alaska to pressure of 14.65 pSisia and to a
temperature of 60o F. Authority 20
Printed Name Diane Colley Phone (907) 564-5775 Date lO / AAC25.235.
✓Ty
n(a4 J 5
Form 10422 Rev. 5/2009 INSTRUCTIONS ON REVERSE SIDE Submit in Duplicate
9/1/2015
9/5/2015
9/14/2015
9/19/2015
9/5/2015
9/8/2015
9/9/2015
9/9/2015
9/4/2015
9/14/2015
9/17/2015
9/25/2015
BP EXPLORATION (ALASKA) INC.
PRUDHOE BAY UNIT- FS -2
GAS FLARING INCIDENT REPORT
September 2015
1726-1750 117 Not required for unplanned events <= 1 hr
0841-0855 333
TOTAL 450
0430-1240
1524-1700
TOTAL
1350-1355
1630-1704
0805-0859
1328-1345
TOTAL
1045-1200
0430-2230
1145-1600
1630-1830
TOTAL
Unplanned Events < 1 Hour
Unplanned Events> 1 Hour
Planned Events < 1 hour and not
exceeding 5,000 MCF
Planned Events> 1 hour or
exceeding 5,000 MCF
Pilot Purge
Assist
TOTAL FLARED VOLUME
2,381 See attachments
400
2,781
178 See attachments
244
517
326
1,265
286 See attachments
5,248
653
581
6,768
TOTAL
450
2,781
1,265
6,768
12,384
10,698
34,346
Not required for unplanned events <= 1 hr
See attachments
See attachments
See attachments
Page 5
10/15/2015
10:43 AM
Flare Start Date 09/01/2015
Flare End Date 09/30/2015
FS2 Flare Report
Total Volume (MSCF) 11264
Report
Numbe System Date StartTime Stop Time Duration Intermittent Black Smoke Planned Reported By Volume
15-297 Flare Relief 09/04/2015 10:45:00 am 12:00:00 pm 75 min No No Yes BP1\ELLISOFD 286
Determination Cause Shutdown DS 4 and depressured the manifold piping, 4"C/D" common line and 4"B" common line for Smart pigging Pig Receiver install.
Action Taken Completed depressuring.
Daily Volume (MSCF) 286
Daily Volume (MSCF) 843
15-307 Controlled Blowdown 09/14/2015 43000 am 12:40:00 pm 490 min No No No BP1\BARKERJ 2381
Determination Cause TIC XXXX shutdown for unplanned maintenance
Action Taken Took turbine down to repair oil leaks after engine swap out on 1801
15-307 Controlled Blowdown 09/14/2015 4:30:00 am 10:30:00 pm 1080 min No No Yes BPt\BARKERJ 5248
Determination Cause TIC XXXX shutdown for planned maintenance
Action Taken 1801 Turbine swap.
Daily Volume (MSCF) 7629
15-308 Other 09/17/2015 11:45:00 am 4:00:00 pm 255 min No No Yes BPt\RALPHJM
Determination Cause De -pressured C/L's 4C, 413, 16D and 17D for launcher/receiver removal prep for DS4 line.
Action Taken Completed de -pressuring of lines.
Daily Volume (MSCF)
15-311 Other 09/19/2015 3:24:00 pm 5:00:00 pm 96 min Yes No No BPI\LALAJR
Determination Cause STV -IP T\C 1801 shutdown due to a problem associated with production swing from PCM1 10 Power supply failure
Action Taken Loaded STV/IP TIC.
653
653
400
Generated 10/02/2015 2:48:30PM Page 3 of 8
15-298 Flare Relief 09/05/2015 1:50:00 pm 1:55:00 pm 5 min No No Yes BPI\REIMBT
178
Determination Cause
Shutdown for unplanned maintenance, depressuring "C" Slug Catcher for Crack in the Inlet Piping.
Action Taken
Completed depressuring.
Daily Volume (MSCF)
511
15-303 Flare Relief 09/08/2015 4:30:00 pm 5:04:00 pm 34 min No No Yes BP1\ELLISOFD
244
Determination Cause
Depressured 4"C" for leak at the temporary pig launcher.
Action Taken
Completed depressuring.
Daily Volume (MSCF)
244
15-305 Controlled Blowdown 09/09/2015 8:05:00 am 8:59:00 am 54 min No No Yes BP7\ELLISOFD
517
Determination Cause
Depressured 4C for leak at the temporary pig launcher.
Action Taken
Completed depressuring.
15-305 Controlled Blowdown 09/09/2015 1:28:00 pm 1:45:00 pm 17 min No No Yes BP1\ELLISOFD
326
Determination Cause
Depressured 4C common line to Slug catcher pressure (160 psigAo start production into common line.
Action Taken
Completed depressuring.
Daily Volume (MSCF) 843
15-307 Controlled Blowdown 09/14/2015 43000 am 12:40:00 pm 490 min No No No BP1\BARKERJ 2381
Determination Cause TIC XXXX shutdown for unplanned maintenance
Action Taken Took turbine down to repair oil leaks after engine swap out on 1801
15-307 Controlled Blowdown 09/14/2015 4:30:00 am 10:30:00 pm 1080 min No No Yes BPt\BARKERJ 5248
Determination Cause TIC XXXX shutdown for planned maintenance
Action Taken 1801 Turbine swap.
Daily Volume (MSCF) 7629
15-308 Other 09/17/2015 11:45:00 am 4:00:00 pm 255 min No No Yes BPt\RALPHJM
Determination Cause De -pressured C/L's 4C, 413, 16D and 17D for launcher/receiver removal prep for DS4 line.
Action Taken Completed de -pressuring of lines.
Daily Volume (MSCF)
15-311 Other 09/19/2015 3:24:00 pm 5:00:00 pm 96 min Yes No No BPI\LALAJR
Determination Cause STV -IP T\C 1801 shutdown due to a problem associated with production swing from PCM1 10 Power supply failure
Action Taken Loaded STV/IP TIC.
653
653
400
Generated 10/02/2015 2:48:30PM Page 3 of 8
Flare Start Date 09/01/2015
Flare End Date 09/30/2015
15-316 Other 09/25/2015 4:30:00 pm 6:30:00 pm 120 min No
Determination Cause 'RC 1804 spin cooling
Action Taken Completed spin cooling.
Daily Volume (MSCF) 400
No Yes BPI4STRAC8 581
Daily Volume (MSCF) 581
Total Volume (MSCF) 11264
Generated 10/02/2015 2:48:30PM Page 4 of
STATE OF ALASKA
ALASKA OIL AND GAS CONSERVATION COMMISSION
FACILITY REPORT OF PRODUCED GAS DISPOSITION
1. Facility Number
0290000029
2. Facility Name
JPBIJ FS 2
3. Field
PBU - EOA
4, Operator
BP
5. MonthNear of Disposition
I October -2015
Disposition
Volume MCF
20. For production from multiple pools, list contribution of each pool as a percent of
Total Volume.
6. Sold
Pool Name Pool Code Percent
7. Reinjected
(I
,
PRU DHOE 640150 100.00
8. Flared or vented 1 hour or less
1,891
9. Flared or vented more than 1 hour (see instr.)
0
.
10. Pilot and Purge
12,494
11. Assist Gas
2,164
.
12. Fuel gas used in lease operations.
674,762
13. Other (see instructions)
Q
Official Use Only
.
Authorization >1 hr:
Safety
MCF
14. TOTAL VOLUME (ITEMS 6-12)
691,311
Lease Use
MCF
15. NGL Gas Equivalent
0
Conservation
MCF
16. Purchased gas
Waste:
MCF
17. Transferred from: CGF
267,549
18. Transferred to: (Express as a negative #) CGF
-16,693,434
Commissioner Date
19. Remarks:
I hereby certify that tthhee foregoing is true and correct to the best of my knowledge.
Note: All volumes must be corrected
Signature CJK�G"/ I$ 1 iC.fstt!(/ V Title Manager Production Taxes nd Royalties Alaska to pressure of 14.65 psis and to a
Ijj I / temperature of 60o F. Authority 20
Printed Name Diane Colley Phone (907) 564-5775 Date AAC25.235.
Form 10-422 Rev. 5/2009 INSTRUCTIONS ON REVERSE SIDE Submit in Duplicate
BP EXPLORATION (ALASKA) INC.
PRUDHOE BAY UNIT - FS -2
GAS FLARING INCIDENT REPORT
October 2015
DATE TIME
VOLUME
DESCRIPTION OF INCIDENT & CAUSE
ACTION TAKEN TO ELIMINATE CAUSE
10/11/2015 0942-0953
1,600
Not required for unplanned events <= 1 hr
Not required for unplanned events <= 1 hr
10/16/2015 0920-1020
291
TOTAL
1,891
Unplanned Events greater than 1 hour
DATE TIME
VOLUME
DESCRIPTION OF INCIDENT & CAUSE
ACTION TAKEN TO ELIMINATE CAUSE
See attachments
See attachments
TOTAL
0
Planned Events Less Than or Equal 1 Hour AND <= 5,000 mcf
DATE TIME
VOLUME
DESCRIPTION OF INCIDENT & CAUSE
ACTION TAKEN TO ELIMINATE CAUSE
See attachments
See attachments
TOTAL
0
Planned Events Exceeding 1 Hour OR > 5,000 mcf
DATE TIME
VOLUME
DESCRIPTION OF INCIDENT & CAUSE
ACTION TAKEN TO ELIMINATE CAUSE
See attachments
See attachments
TOTAL
0
TOTAL
Unplanned Events < 1 Hour
1,891
Unplanned Events> 1 Hour
0
Planned Events < 1 hour and not
0
exceeding 5,000 MCF
Planned Events > 1 hour or
0
exceeding 5,000 WE
Pilot Purge
12,494
Assist
2,164
TOTAL FLARED VOLUME
16,549
Page 6
11/16/2015
3:35 PM
Flare Start Date 10/01/2015
Flare End Date 10/31/2015
FS2 Flare Report
Total Volume (MSCF) 1891
Report
Numbe System Date Start Time Stop Time Duration Intermittent Black Smoke Planned Reported By Volume
Total Volume (MSCF) 1891
Generated 11/06/2015 3:25'.34PM Page 8 cf 12
STATE OF ALASKA
ALASKA OIL AND GAS CONSERVATION COMMISSION
FACILITY REPORT OF PRODUCED GAS DISPOSITION
1. Facility Number 2. Facility Name
0290000029 PBU FS 2
Disposition
3. Field
PBU - EOA
Volume MCF
4. Operator 5. Month/Year of Disposition
BP November -2015
20. For production from multiple pools, list contribution of each pool as a percent of
Total Volume.
6. Sold
0
Pool Name Pool Code Percent
7. Reinjected
PRUDHOE 640150 100.00%
8. Flared or vented 1 hour or less
106
9. Flared or vented more than 1 hour (see instr.)
39
10. Pilot and Purge
12,146
11, Assist Gas
2,410
12. Fuel gas used in lease operations.
656,407
13. Other (see instructions)
Ofllcial Use Only
Authorization>1 hr:
Safety
.7
MCF
14. TOTAL VOLUME (ITEMS6-12)671,108
Lease Use
MCF
15. NGL Gas Equivalent
0
Conservation
MCF
16. Purchased gas
Waste:
MCF
17. Transferred from: CGF
263,335
/
18. Transferred to: (Express as a negative #) CGF
-15,467,788
Commissioner Date
19. Remarks:
I hereby certify that the foregoing is true and Correct to the best of my knowledge.
Signature r�l r/,C� Note: All volumes must be corrected
,rye. i Title Manager Production Taxes and Royalties Alaska to pressure of 14.65 psis and to a
/ /C—/ — temperature of 60o F. Authority 20
Printed Name Diane Colley Phone (907) 564-5775 Date 7 AAC25.235.
y TL
1 /s/i6
Form 10-422 Rev, 5/2009 INSTRUCTIONS ON REVERSE SIDE Submit in Duplicate
BP EXPLORATION (ALASKA) INC.
PRUDHOE BAY UNIT- FS -2
GAS FLARING INCIDENT REPORT
November 2015
Unplanned Events less than or equal to 1 hour
DATE TIME VOLUME DESCRIPTION OF INCIDENT & CAUSE ACTION TAKEN TO ELIMINATE CAUSE
11/1/2015 1242-1300 76 Not required for unplanned events <= 1 hr Not required for unplanned events <= 1 hr
11/1/2015 1400-1407 30
TOTAL 106
DATE TIME VOLUME
DESCRIPTION OF INCIDENT & CAUSE
ACTION TAKEN TO ELIMINATE CAUSE
11/7-8/2015 1900-0300 39
See attachments
See attachments
TOTAL 39
0
exceeding 5,000 MCF
Planned Events Less Than or Equal 1 Hour AND <= 5,000 mcf
Planned Events > 1 hour or
DATE TIME VOLUME
DESCRIPTION OF INCIDENT & CAUSE
ACTION TAKEN TO ELIMINATE CAUSE
Pilot Purge
See attachments
See attachments
TOTAL 0
TOTAL FLARED VOLUME
14,701
Planned Events Exceeding 1 Hour OR > 5,000 mcf
DATE TIME VOLUME
DESCRIPTION OF INCIDENT & CAUSE
ACTION TAKEN TO ELIMINATE CAUSE
See attachments
See attachments
TOTAL 0
Page 4
12/15/2015
952 AM
TOTAL
Unplanned Events < 1 Hour
106
Unplanned Events > 1 Hour
39
Planned Events < 1 hour and not
0
exceeding 5,000 MCF
Planned Events > 1 hour or
0
exceeding 5,000 MCF
Pilot Purge
12,146
Assist
2,410
TOTAL FLARED VOLUME
14,701
Page 4
12/15/2015
952 AM
Flare StartDate 11/01/2015
Flare End Date 11/30/2015
FS2 Flare Report
Total Volume (MSCF) 145
Report
Numbe System Date StartTime Stop Time Duration Intermittent Black Smoke Planned Reported By Volume
15-377 Flare Relief 11/07/2015 7:00:00 pm 12:00:00 am 300 min No No No BPIGARKERJ 24
Determination Cause Wind mused a power line slap that resulted in a plant shutdown.
Action Taken Brought plant back up.
Daily Volume (MSCF) 24
15-378 Flare Relief 11/08/2015 120000 am 30000 am 180 min No No No BPlkBARKERJ 15
Determination Cause Wind caused power line slap that resulted in plant SD.
Action Taken Brought compressor back online.
Daily Volume (MSCF) 15
Total Volume (MSCF) 145
Generated 12/03/2015 4:18:41 PM Page 4 of 7
11/20/2015
Flaring Event at FS2
Flaring Event at FS2
AK, OPS PCC EOC TL [AKOPSPCCEOCTL@bp.com]
Sent:Monday, November 09, 2015 2:29 PM
To: AOGCC Reporting (DOA sponsored)
Cc: Loepp, Victoria T (DOA); Benson, Gary A [Gary.Benson@bp.com]; Arthur, Gregory [Gregory.Arthur@bp.com]; AK, OPS GC3&PCC
OSM [AKOPSGC3PCCOSM@BP.com]; Martin, Nelson D [Nelson.Martin@bp.com]; AK, HSSEE Env Adv East
[AKHSSEEEnvAdvEast@bp.com]; AK, OPS FS2 Facility OTL [AKOPSFS2FacilityOTL@bp.com]; AK, OPS FS2 OSM
[AKOPSFS2OSM@BP.com]; Glover, Robin (SLR) [Robin.Glover@bp.com]
To: AOGCC Reporting CC: Victoria Loepp, AOGCC
aoacc. reporti ng@alas ka.aov
From: Jennifer Blake, GPB Production Optimization Team Leader
A flaring event occurred at FS2 starting at 11/07/2015 19:00 and stopping at 11/08/2015 03:00. The event was due
to a plant shutdown initiated by power surges caused by wind gusts slapping the power lines together. The flaring
stopped once the plant was restarted on 11/8. The daily volumes and times are as follows.
• 11/07/2015 19:00 and stopping at 11/08/2015 00:00 with a volume of 24 (MSCF). The event lasted for 300
minutes.
• 11/08/2015 00:00 and stopping at 11/08/2015 03:00 with a volume of 15 (MSCF). The event lasted for 180
minutes.
Thanks,
Jennifer Blake
PCC/EOC Production Optimization Team Lead (alt David Spall)
Office (907) 659-4472
Cell (907) 830-6204
Jennifer.blake@bp.com
https://webm ai la.alaska.gov/owa/?ae= Item&t= IPM.Note&id=RgAAAABKLne2zgP4SOM kepOhCxbSBwBUvQ964rjQTgYgn3632GdIAAAAhhLyAABUvQ964rjQT... 1/1
STATE OF ALASKA
ALASKA OIL AND GAS CONSERVATION COMMISSION
FACILITY REPORT OF PRODUCED Gos n1SPnS1T1nNI
1. Facility Number 2. Facility Name
0290000029 PBU FS 2
Disposition
3. Field
PBU - EOA
Volume MCF
4. Operator . • ... • 5. MonthNear of Disposition
BP I December -2015
20. For production from multiple pools, list contribution of each pool as a percent of
Total Volume.
6. Sold
Pool Name Pool Code Percent
7. Reinjected
0
PRUDHOE 640150 100.00%
8. Flared or vented 1 hour or less
131
9. Flared or vented more than 1 hour (see instrf
6,227
10. Pilot and Purge
12,877
11. Assist Gas
5,524
12. Fuel gas used in lease operations.
682,282
13. Other (see instructions)
0
Official Use Only
Authorization >1 hr:
Safety
/
[o -2 z
MCF
74. TOTAL VOLUME (ITEMS 6-12)
707,041
Lease Use
MCF
15. NGL Gas Equivalent
0
Conservation
MCF
16. Purchased gas
p
Waste:
MCF
17. Transferred from: CGF
271 331
n
/1 _
/ ,✓ �—, Z —/1
18. Transferred to: (Express as a negative #) CGF
-17,903,587
Commissioner Date
19. Remarks:
I hereby certify that the foregoing is true and correct to the best of my knowledge.
Signature 811nil 141 Note: All volumes must be corrected
_ Title Manager Production Taxes and R alties Alaska to pressure of 14.65 psia and to a
Printed Name Diane Colley ' //-temperature of 60o F. Authority 20
Phone (907) 56a-5775 Date / 7 !� AAC25.235.
Y T I-
2/t0/it
Form 10-422 Rev. 5/2009 INSTRUCTIONS ON REVERSE SIDE Submit in Duplicate
BP EXPLORATION (ALASKA) INC.
PRUDHOE BAY UNIT- FS -2
GAS FLARING INCIDENT REPORT
December 2015
Unplanned Events less than or equal to 1 hour
DATE TIME VOLUME DESCRIPTION OF INCIDENT & CAUSE ACTION TAKEN TO ELIMINATE CAUSE
12/10/2015 1140-1207 131 Not required for unplanned events <= 1 hr Not required for unplanned events <= 1 hr
TOTAL 131
See attachments
See attachments
TOTAL 0
Planned Events Less Than or Equal 1 Hour AND <= 5,000 mcf
DATE TIME VOLUME DESCRIPTION OF INCIDENT & CAUSE ACTION TAKEN TO ELIMINATE CAUSE
See attachments See attachments
Unplanned Events < 1 Hour
Unplanned Events > 1 Hour
Planned Events < 1 hour and not
exceeding 5,000 MCF
Planned Events> 1 hour or
exceeding 5,000 MCF
Pilot Purge
Assist
TOTAL FLARED VOLUME
TOTAL
131
0
0
6,227
12,877
5,524
24,759
Page 4
1/14/2016
4:19 PM
TOTAL
0
Planned Events Exceeding 1 Hour OR > 5,000 mcf
DATE
TIME
VOLUME DESCRIPTION OF INCIDENT & CAUSE ACTION TAKEN TO ELIMINATE CAUSE
12/9/2015
0340-2140
5,250 See attachments See attachments
12/27/2015
0845-1145
977
TOTAL
6.227
Unplanned Events < 1 Hour
Unplanned Events > 1 Hour
Planned Events < 1 hour and not
exceeding 5,000 MCF
Planned Events> 1 hour or
exceeding 5,000 MCF
Pilot Purge
Assist
TOTAL FLARED VOLUME
TOTAL
131
0
0
6,227
12,877
5,524
24,759
Page 4
1/14/2016
4:19 PM
Flare Start Date 12/01/2015
Flare End Date 12/312015
FS2 Flare Report Total Volume (MSCF) 6358
Report
Numbe System Date Start Time Stop Time Duration Intermittent Black Smoke Planned Reported By Volume
15-401 Flare Relief 12/09/2015 3:40:00 am 9:40:00 pm 1080 min No No Yes BPI RALPHJM 5250
Determination Cause 'RC 1801 was shutdown for planned maintenance - 2000 hr horoscope.
Action Taken Completed the horoscope inspection. Re -started the STV/1P compressor.
15-415 Controlled Blowdown 12/27/2015 8:45:00 am 11:45:00 am 180 min No No Yes BP1\REIMST 977
Determination Cause De -pressure OS09 "A" and 9 "B" C/Ls for Drill Site work at the DS Manifold Bldg.
Action Taken Completed de -pressuring.
Total Volume (MSCF) 6356
Generated 01/08/2016 11:15:02AM Page 3 of 7
12/14/2015
Flaring Event at FS2
Flaring Event at FS2
AK, OPS PCC EOC TL [AKOPSPCCEOCTL@bp.com]
Sent:Saturday, December 12, 2015 2:04 PM
To: AOGCC Reporting (DOA sponsored)
Cc: Loepp, Victoria T (DOA); Benson, Gary A [Gary.Benson@bp.com]; Arthur, Gregory [Gregory.Arthur@bp.com]; AK, OPS GC3&PCC
OSM [AKOPSGC3PCCOSM@BP.com]; Martin, Nelson D [Nelson.Martin@bp.com]; AK, HSSEE Env Adv East
[AKHSSEEEnvAdvEast@bp.com]; AK, OPS FS2 Facility OTL [AK0PSFS2Facility0TL@bp.com]; AK, OPS FS2 OSM
[AKOPSFS2OSM@BP.com]; Glover, Robin (SLR) [Robin.Glover@bp.com]; Kain, Rachel B [Rachel.Kain@bp.com]
To: AOGCC Reporting CC: Victoria Loepp, AOGCC
aoacc.reoortina(a)alas ka gov
From: Jennifer Blake, GPB Production Optimization Team Leader
A flaring event occurred at FS2 starting at 12/09/2015 03:40 and stopping at 12/09/2015 21:40 with a volume of 5250
(MSCF). The event lasted for 1080 minutes. The event had a volume greater than 5000 (MSCF) and was due to a
shutdown of T/C 1801 for planned maintenance. The event stopped when maintenance was completed and the
compressor was restarted.
Thanks,
Jennifer Blake
PCC/EOC Production Optimization Team Lead (alt David Spall)
Office (907) 659-4472
Cell (907) 830-6204
Jennifer.blake@bp.com
https://webmai la.alaska.gcv/owa/?ae=Item&t= IPM.N ote&id= RgAAAABKLne2zgP4SoM kepOhCxbSBwBUvQ964rjQTgYgn3632GdIAAAAhhLyAABUvQ964rjQT... 1/1
1/19/2016 CORRECTION #2: Flaring Event at FS2
Reply Reply All Forward
CORRECTION #2: Flaring Event at FS2
AK, OPS PCC EOC TL [AKOPSPCCEOCTL@bp.com]
To: AOGCC Reporting (DOA sponsored)
Cc: Loepp, Victoria T (DOA); Benson, Gary A [Gary.Benson@bp.com]; Arthur, Gregory [Gregory.Arthur@bp.com];
AK, OPS GC3&PCC OSM [AKOPSGC3PCCOSM@BP.com]; Martin, Nelson D [Nelson.Martin@bp.com];
AK, HSSEE Env Adv East [AKHSSEEEnvAdvEast@bp.com]; AK, OPS FS2 Facility OTL [AKOPSFS2FacilityOTL@bp.com];
Friday, January 08, 2016 3:05 PM
To: AOGCC Reporting CC: Victoria Loepp, AOGCC
aogcc. reoortina(Walaska.aov
From: Jennifer Blake, GPB Production Optimization Team Leader
Second correction to the F52 flaring event on 12/27:
A flaring event occurred at FS2 starting at 12/27/2015 08:45 and stopping at 12/27/2015 11:45 with a volume of
977 (MSCF). The event lasted for 180 minutes. The event was due to De -pressuring DS09 "A" and 9 "B" C/Ls
for Drill Site work at the DS Manifold Bldg. The event stopped when the depressuring was complete.
Thanks,
Jennifer Blake
PCC/EOC Production Optimization Team Lead (alt David Spall)
Office (907) 659-4472
Cell (907) 830-6204
Jennifer.blakeCaZibo.COm
From: AK, OPS PCC EOC TL
Sent: Friday, January 08, 2016 9:51 AM
To: 'aogcc.reporting@alaska.gov'
Cc: 'Loepp, Victoria T (DOA) (victoria.loepp@alaska.gov)'; Benson, Gary A; Arthur, Gregory; AK, OPS GC3&PCC
OSM; Martin, Nelson D; AK, HSSEE Env Adv East; AK, OPS FS2 Facility OTL; AK, OPS FS2 OSM; Glover, Robin
(SLR); Kain, Rachel B
Subject: CORRECTION: Flaring Event at FS2
To: AOGCC Reporting CC: Victoria Loepp, AOGCC
aoacc reporti nge. alas ka. gov
From: Jennifer Blake, GPB Production Optimization Team Leader
https:ltwebmai la.alaska.gov/mat?ae=ltem&a=Open&t=IPM.Note&id=RgAAAABKLne2zgP4SoMkepOhCxbSBwBUvQ964rjQTgYgn3632GdL4AAAhhLyAABUv... 1/1
1/19/2016 CORRECTION: Flaring Event at FS2
Reply Reply All Forward
CORRECTION: Flaring Event at FS2
AK, OPS PCC EOC TL [AKOPSPCCEOCTL@bp.com]
rc: AOGCC Reporting (DOA sponsored)
Cc. Loepp, Victoria T (DOA); Benson, Gary A [Gary.Benson@bp.com]; Arthur, Gregory [Gregory.Arthur@bp.com];
AK, OPS GC3&PCC OSM [AKOPSGC3PCCOSM@BP.com]; Martin, Nelson D [Nelson.Martin@bp.com];
AK, HSSEE Env Adv East [AKHSSEEEnvAdvEast@bp.com]; AK, OPS FS2 Facility OTL [AKOPSFS2FacilityOTL@bp.com];
Friday, January 08, 2016 9:51 AM
To: AOGCC Reporting CC: Victoria Loepp, AOGCC
aoacc reoortincLalaska.aov
From: Jennifer Blake, GPB Production Optimization Team Leader
Correction to the FS2 flaring event on 12/27:
A flaring event occurred at FS2 starting at 12/27/2015 09:00 and stopping at 12/27/2015 1 l :15 with a volume of
977 (MSCF). The event lasted for 135 minutes. The event was due De -pressuring the MI EOA line to 15009s for
planned line lift inspection. The event stopped once field piping was blown down to 1500 #'s.
Thanks,
Jennifer Blake
PCC/EOC Production Optimization Team Lead (alt David Spall)
Office (907) 659-4472
Cell (907) 830-6204
Jennifer.blakeC@bo.com
From: AK, OPS PCC EOC TL
Sent: Tuesday, December 29, 2015 10:01 AM
To: 'aogcc.reporting@alaska.gov'
Ce: 'Loepp, Victoria T (DOA) (victoria.loepp@alaska.gov)'; Benson, Gary A; Arthur, Gregory; AK, OPS GC3&PCC
OSM; Martin, Nelson D; AK, HSSEE Env Adv East; AK, OPS FS2 Facility OTL; AK, OPS FS2 OSM; Glover, Robin
(SLR); Kain, Rachel B
Subject: Flaring Event at FS2
To: AOGCC Reporting CC: Victoria Loepp, AOGCC
aoacc reoortina(cDalas ka aov
From: David Spall, GPB Production Optimization Team Leader
A flaring event occurred at FS2 starting at 12/27/2015 08:45 and stopping at 12/27/2015 11:45 with a volume of 1
(MSCF). The event lasted for 135 minutes. The event was due De -pressuring the MI EOA line to 150C#'s for
planned line lift inspection. The event stopped once field piping was blown down to 1500 #'s.
https://webmai la.alaska.gov/owa/?ae=ltem&a=Open&t=IPM.Note&id=RgAAAABKLne2zgP4SoMkepOhCzbSBwBUvQ964rjQTgYgn3632GdIAAAAhhLyAABUv... 1/1
12/30/2015
Flaring Event at FS2
Flaring Event at FS2
AK, OPS PCC EOC TL [AKOPSPCCEOCTL@bp.com]
Sent:Tuesday, December 29, 2015 10:00 AM
To: AOGCC Reporting (DOA sponsored)
Cc: Loepp, Victoria T (DOA); Benson, Gary A [Gary.Benson@bp.com]; Arthur, Gregory [Gregory.Arthur@bp.com]; AK, OPS GC3&PCC
OSM [AKOPSGC3PCCOSM@BP.com]; Martin, Nelson D [Nelson.Martin@bp.com]; AK, HSSEE Env Adv East
[AKHSSEEEnvAdvEast@bp.com]; AK, OPS FS2 Facility OTL [AKOPSFS2FacilityOTL@bp.com]; AK, OPS FS2 OSM
[AKOPSFS2OSM@BP.com]; Glover, Robin (SLR) [Robin.Glover@bp.com]; Kain, Rachel B [Rachel.Kain@bp.com]
To: AOGCC Reporting CC: Victoria Loepp, AOGCC
aoocc.reoortingja)alaska Qov
From: David Spall, GPB Production Optimization Team Leader
A flaring event occurred at FS2 starting at 12/27/2015 08:45 and stopping at 12/27/2015 11:45 with a volume of 1
(MSCF). The event lasted for 135 minutes. The event was due De -pressuring the MI EOA line to 1500#'s for
planned line lift inspection. The event stopped once field piping was blown down to 1500 #'s.
Thanks,
David Spall (Alternate—Jennifer Blake)
PCC/EOC Production Optimization Team Lead
907-659-4472 Office
219-689-4036 Cell