RECEIVED
FEB 19 2015
STATE OF ALASKA
ALASKA OIL AND GAS CONSERVATION COMMISSION AOGCCa
FACILITY REPORT OF PRODUCED GAS DISPOSITION
1. Facility Number
0290000030
2. Facility Name
PBU FS 3
3. Field
PBU - EOA
4. Operator
BP
5. Monthlyear of Disposition
January -2015
Disposition
Volume MCF
20. Forproduction from multiple pools, list contribution of each pool as a percent of
Total Volume.
6. Sold
0
Pool Name Pool Code Percent
7. Reinjected
0
PRUDHOE 640150 100.00%
8. Flared or vented 1 hour or less
0
9. Flared or vented more than 1 hour (see instr.)
0
10. Pilot and Purge
37,210
11. Assist Gas
15
12. Fuel gas used in lease operations.
990,920
13. Other (see instructions)
0
Official Use Only
Authorization >1 hr:
Safety
MCF
14. TOTAL VOLUME (ITEMS 6-12)
1,028,145
Lease Use
MCF
15. NGL Gas Equivalent
0
Conservation
MCF
16. Purchased gas
0
Waste:
MCF
17. Transferred from:CGF
1,028,130
Commissioner Dale
18. Transferred to: (Express as a negative #) CGF
-28,116,943
19. Remarks:
I hereby certify that the foregoing is true and correct to the best of my knowledge.
Signature x DM�1 A I Title Mana er Production Taxes and Royalties Alaska
Note: All volumes must be corrected
to pressure Of 14.65 psis and t0 a
temperature of 60o F. Authority 20
AAC25.235.
Printed Name Diane Colley Phone (907) 564-5775 Date
Form 10-422 Rev. 512009 INSTRUCTIONS ON REVERSE SIDE Submit in Duplicate
STATE OF ALASKA
ALASKA OIL AND GAS CONSERVATION COMMISSION
FACILITY REPORT OF PRODUCED GAS DISPOSITION
1. Facility Number
0290000030
2. Facility Name
PBU FS 3
3. Field
PBU - EOA
4. Operator
BP
5. Monthryear of Disposition
I February -2015
Disposition
Volume MCF
20. For production from multiple pools, list contribution of each pool as a percent of
Total Volume.
6. Sold
0
Pool Name PoolCode Percent
7. Reinjected
0
PRUDHOE 640150 100.00%
8. Flared or vented 1 hour or less
185
9. Flared or vented more than 1 hour (see instr.)
0
10. Pilot and Purge
33,622
11. Assist Gas
34
12. Fuel gas used in lease operations.
868,260
13. Other (see instructions)
0
Official Use Only
Authorization >11 hr.
Safety
MCF
14. TOTAL VOLUME (ITEMS 6-12)
902,101
Lease Use
MCF
15. NGL Gas Equivalent
0
Conservation
MCF
16. Purchased gas
0
Waste:
MCF
17. Transferred from: CGF
901,882
18. Transferred to: (Express as a negative #) CGF
-25,248,708
Commissioner Date
19. Remarks:
I hereby certify that the foregoing is true and correct to the best of my knowledge.
//A///V/1/A/l% /I1
Signature�`Ae�CXJ Title Manager Production Taxes and Royalties Alaska
Note: All volumes must be corrected
to pressure of 14.65 psia and to a
of 60o F. Authority 20
AAC25.235.
Printed Name Diane ColleyPhone (907) 564-5775 Date AIKtemperature
Form 10-422 Rev. 5/2009 INSTRUCTIONS ON REVERSE SIDE Submit in Duplicate
STATE OF ALASKA
ALASKA OIL AND GAS CONSERVATION COMMISSION
FACILITY REPORT OF PRODUCED GAS DISPOSITION
1. Facility Number
0290000030
2. Facility Name
IPBU FS 3
3. Field
PBU - EOA
4. Operator
BP
5. Month/Vear of Disposition
March -2015
Disposition
Volume MCF
20. For production from multiple pools, list contribution of each pool as a percent of
Total Volume.
6. Sold
0
Pool Name Pool Code Percent
7. Reinjected
0
PRUDHOE 640150 100.00
B. Flared or vented 1 hour or less
0
9. Flared or vented more than 1 hour (see instr.)
1,026
10. Pilot and Purge
37,561
11. Assist Gas
2,878
12. Fuel gas used in lease operations.
1,006,487
13. Other (see instructions)
0
Official Use Only
Authorization >1 hr:
Safety
/0'Z //
5�
MCF
14. TOTAL VOLUME (ITEMS 6-12)
1,047,952
Lease Use
MCF
15. NGL Gas Equivalent
0
Conservation
MCF
16. Purchased gas
0
Waste:
MCF
17. Transferred from: CGF
1,044,048
P 5..-12 —/5'-
18. Transferred to: (Express as a negative #) CGF
-32,072,873
Commissioner Date
19. Remarks:
I hereby certify that the foregoing is true and correct to the best of my knowledge.
Signature (" f;rTitle Manager Production Taxes and Royalties Alaska
Note: All volumes must be corrected
to pressure of 14.65 psia and to a
temperature of 60o F. Authority 20
AAC25.235.
Printed Name Diane Colley Phone (907) 564-5775 Date 1�
P
Form 10-422 Rev. 5/2009 INSTRUCTIONS ON REVERSE SIDE Submit in Duplicate
BP EXPLORATION (ALASKA) INC.
PRUDHOE BAY UNIT - FS -3
GAS FLARING INCIDENT REPORT
March 2015
Unplanned Events less than or equal to 1 hour _
DATE TIME VOLUME DESCRIPTION OF INCIDENT & CAUSE ACTION TAKEN TO ELIMINATE CAUSE
Not required for unplanned events <=1 hr Not required for unplanned events <= 1 hr
TOTAL 0
Unplanned Events greater than 1 hour
-- - r------,,,.) rs �: Tib i �lldlllJw%Dlrl hnc pFcrarP710N 9F.IN[IDENTA CAUCF. ._.. _�----ACTIO-E
See attachments See attachments
Page 5
TOTAL U
Planned Events Less Than or Equal 1 Hour AND <= 5,000 mcf
DATE TIME VOLUME DESCRIPTION OF INCIDENT & CAUSE
ACTION TAKEN TO ELIMINATE CAUSE
See attachments
See attachments
TOTAL 0
Planned Events Exceeding 1 Hour OR > 5,000 mcf
DATE TIME VOLUME DESCRIPTION OF INCIDENT & CAUSE
ACTION TAKEN TO ELIMINATE CAUSE
3/8/2015 0750-1120 1,026 See attachments
See attachments
TOTAL 1,026
TOTAL
Unplanned Events < 1 Hour 0
Unplanned Events > 1 Hour 0
Planned Events < 1 hour and not 0
exceeding 5,000 MCF
Planned Events> 1 hour or 1,026
exceeding 5,000 MCF
Pilot Purge
Assist _ �2SY6.
TOTAL FLARED VOLUME 41,465
4:06 PM
Flare Start Date 03/01/2015
Flare End Date 03/31/2015
FS3 Flare Report Total Volume (MSCF) 1026
Report
Numbs System Date Start Time Stop Time Duration Intermittent Black Smoke Planned Reported By Volume
15-59 Controlled Slowdown 03/08/2015 7:50:00 am 11:20:00 am 210 min No No Yes BPi\GAKbKtM I um
Determination Cause Manual SD of 1802 for planned boroscope, and routine maintenance. IP gas was flared for 3.5 hrs.
Action Taken Boroscope completed, 1802 up in one start.
Daily Volume (MSCF) 1026
Total Volume (MSCF) 1026
Generated 04/03/2015 3:26:36PM Page 6 of 8
Hunt Jennifer L (DOA)
From: AK, OPS PGC EOC TL <AKOPSPCCEOCTL@bp.com>
Sent: Monday, March 09, 2015 1:33 PM
To: Hunt, Jennifer L (DOA)
Cc. Loepp, Victoria T (DOA); Roby, David S (DOA); Castano, Alejandra; Benson, Gary A;
Arthur, Gregory; AK, HSSEE Env Adv West; Loader, Neil; AK, OPS GC3&PCC OSM; AK,
HSSEE Env Adv East; AK, OPS FS3 Facility OTL; AK, OPS FS3 OSM
Subject: Flaring Event at FS3
To: Jennifer Hunt, AOGCC CC: Dave Roby, AOGCC CC: Victoria Ferguson,
AOGCC
iennifer hunter-alaska.gov dave robvCa.alaska.gov victoria ferguson(a)alaska.g
ov
From: Jennifer Blake, GPB Production Optimization Team Leader
A flaring event occurred at FS3 starting at 03/08/2015 07:50 and stopping at 03/08/2015 11:20 with a volume of 1026
(MSCF). The event lasted for 210 minutes and was due shutting down the turbine compressor 1802 for planned
maintenance. Flaring stopped when the maintenance was completed and compressor was started up.
Please let me know if you have any questions.
Thanks
Jennifer Blake
PCC/EOC Production Optimization Team Lead
Office (907) 659-4472
Cell (907) 830-6204
Jennifer.blake@bo.com
RECEIVED
MAY 14 2015
STATE OF ALASKA AOGCC
ALASKA OIL �..... �T\/ milrnnoTNnC conn irim GOSI DISPOSITION
Form 10-422 Rev, 5/2009
INSTRUCTIONS ON REVERSE SIDE
Submit in Duplicate
RECEIVED
JUN 16 2015
STATE OF ALASKA a ��^�
ALASKA OIL AND GAS CONSERVATION COMMISSION =y v
Fnrii iTv RFPORT OF PRODUCED GAS DISPOSITION
..
1. Facility Number 2. Facility Name
0290000030 PBU FS 3
Disposition
3. Field4.
PBU - EOA
Volume MCP
Operator 5. MonthNear of Disposition
BP Ma -2015
20. For production from multiple pools, list contribution of each pool as a percent of
Total Volume.
6. Sold
0
Pool Name Pool Code Percent
7. Reinjected
0
PRUDHOE 640150 100.00
8. Flared or vented 1 hour or less
1,861
9. Flared or vented more than 1 hour (see instr.)
17,651
10. Pilot and Purge
37,574
11, Assist Gas
32,594
12. Fuel gas used in lease operations.
746,550
13. Other (see instructions)
0
Official Use Only
Authorization >t hr:
Safety
y
/ 7� 5 /
MCF
14. TOTAL VOLUME (ITEMS 6-12)
836,230
Lease Use
MCF
15. NGL Gas Equivalent
0
Conservation
MCF
16. Purchased gas
0
Waste:
MCF
17. Transferred from: CGF
784,124
Y z —/(— //
CommissionerDate
18. Transferred to: (Express as a negative #) CGF
-24,142,312
19. Remarks:
I hereby certify that the foregoing is true and correct to the best of my knowledge.
Signature &anC / 1 Title Manager Production Taxes and Royalties Alaska
Note: All volumes must be corrected
to pressure of 14.65 psisia and to a
temperature of 60o F. Authority 20
Printed Name Diane Colley Phone (907) 564-5775 Date a14AAC25.235.
vrL-
Form 10-422 Rev. 5/2009 INSTRUCTIONS ON REVERSE SIDE Submit in Duplicate
BP EXPLORATION (ALASKA) INC.
PRUDHOE BAY UNIT - FS -3
GAS FLARING INCIDENT REPORT
May 2015
l EC" ,, x,17'
JUN i 6 ZO1.
Page 7
Unplanned Events less than or equal to 1 hour
DATE
TIME
VOLUME DESCRIPTION OF INCIDENT & CAUSE ACTION TAKEN TO ELIMINATE CAUSE
5/17/2015
1546-1556
60 Not required for unplanned events <= 1 hr Not required for unplanned events <= 1 hr
5/25/2015
0257-0302
60
5/26/2015
1630-1700
9
5/29/2015
1935-2033
1,604
5/29/2015
1956-2006
80
16,226
TOTAL
1,813
Events greater than 1 hour
See attachments
See attachments
CAUSE
TOTAL 0
Planned Events Less Than or Equal 1 Hour AND <= 5,000 mcf
DATE TIME VOLUME DESCRIPTION OF INCIDENT & CAUSE ACTION TAKEN TO ELIMINATE CAUSE
5/8/2015 1900-19250 2 See attachments See attachments
5/24/2015 1105-1110 40
5/26/2015 0300-0305 3
5/29/2015 0825-0830 3
TOTAL 48
Planned Events Exceeding 1 Hour
OR > 5 UUU mct
DATE
TIME
VOLUME DESCRIPTION OF INCIDENT & CAUSE ACTION TAKEN TO ELIMINATE CAUSE
5/9/2015
1315-1750
9 See attachments See attachments
5/12/2015
0711-0915
493
5/12/2015
0711-0915
275
5/12/2015
0711-0915
163
5/26-28/2015
0300-1615
16,226
5/29/2015
0825-1015
485
TOTAL
17,651
6/12/2015
10:03 AM
Unplanned Events < 1 Hour
Unplanned Events> 1 Hour
Planned Events < 1 hour and not
exceeding 5,000 MCF
Planned Events> 1 hour or
exceeding 5,000 MCF
Pilot Purge
Assist
TOTAL FLARED VOLUME
TOTAL
1,813
0
48
17,651
37,574
32,594
89,680
BP EXPLORATION (ALASKA) INC. RECEIVED
PRUDHOE BAY UNIT - FS -3 JUN 16 2015 Page 8
GAS FLARING INCIDENT REPORT
May 2015
6/12/2015
10:03 AM
Flare Start Date 05/0112015
Flare End Date 05/31/2015
15-150 Other 05/24/2015 11:05:00 am 1110:00 am 5 min No No Yes BPI\CARVERW 40
Determination Cause 1803 TIC -Aborted Start Attempt. Normal Compressor Blowdown volume.
Action Taken Normal Compressor Blowdown volume.
Daily Volume (MSCF) 40
RECEIVE®
JUN 16 2015
15-158 Flare Relief 05/26/2015 3:00:00 am 11:59:00 pm 1259 min No No Yes BP7\NBMSKS 5563
Determination Cause 1802 T/C being down, Baring STV and IP gas from COSD and IP suction scrubber.
Action Taken Continuing flare until machine is back online
15-158 Controlled Slowdown 05/26/2015 3:00:00 am 3:05:00 am 5 min No No Yes BP1\NBMSKS 3
Determination Cause 1802 TIC normal stop for 4000 hr. major GG swap.
Action Taken Completed blowdown sequence
Generated 06/08/2015 8:53:39AM Pageborlu
FS3 Flare Report
Total Volume (MSCF)
19512
Report
System
Date Start Time Stop Time Duration
Intermittent
Black Smoke Planned Reported By
Volume
Numbe
15-135 Other
05/08/2015 7:00:00 pm 7:20:00 pm 20 min
No
No Yes BP1 \BOUWKA
2
Determination Cause
TtC 1803 spin for planned maintenance, Over Speed Trip Test
Action Taken
Completed Test
--
Daily Volume (MSCF)
2
15-137 Other
05/09/2015 1:15:00 pm 4:50:00 pm 215 min
No
No Yes BP1\BOUWKA
9
Determination Cause
T\C 1803 forplanned maintenance for HP Over Speed Trip test
Action Taken
Completed test
Daily Volume (MSCF)
9
15-140 Other
05/122015 7:11:00 am 9:15:00 am 124 min
No
No Yes BP1\BOUWKA
493
Determination Cause
Depressured DS 15 C/LC for maint work at DS end
Action Taken
Completed depressuring.
15-140 Other
05/122015 7:11:00 am 9:15:00 am 124 min
No
No Yes BP1\BOUWKA
275
Determination Cause
Depressured DS 15 C/L D for maint work at DS end
Action Taken
Completed depressuring.
15-140 Other
05/122015 7:11:00am 9:15:00am 124 min
No
No Yes BPI\BOUWKA
163
Determination Cause
Depressured DS 15 C/L B for maint work at DS end
Action Taken
Completed depressuring.
.-
_.._
Daily Volume (MSCF)
931
15-150 Other 05/24/2015 11:05:00 am 1110:00 am 5 min No No Yes BPI\CARVERW 40
Determination Cause 1803 TIC -Aborted Start Attempt. Normal Compressor Blowdown volume.
Action Taken Normal Compressor Blowdown volume.
Daily Volume (MSCF) 40
RECEIVE®
JUN 16 2015
15-158 Flare Relief 05/26/2015 3:00:00 am 11:59:00 pm 1259 min No No Yes BP7\NBMSKS 5563
Determination Cause 1802 T/C being down, Baring STV and IP gas from COSD and IP suction scrubber.
Action Taken Continuing flare until machine is back online
15-158 Controlled Slowdown 05/26/2015 3:00:00 am 3:05:00 am 5 min No No Yes BP1\NBMSKS 3
Determination Cause 1802 TIC normal stop for 4000 hr. major GG swap.
Action Taken Completed blowdown sequence
Generated 06/08/2015 8:53:39AM Pageborlu
RECEIVE®
JUN 16 2015
AOGCC
Total Volume (MSCF) 19512
Generated 06/08/2015 8:53:39AM Page 7 of 10
Flare Start Date 05/01/2015
-I
/
Flare End Date 05/31/2015 / �'�\
15-160 Controlled Blowdown 05/27/2015 12:00:00 am 11:59:00 pm 1439 min No No o Yes BPI\DONATR
6358
Determination Cause Flaring STV gas from COSD and IP gas from the IP Suction Scrubber due to 1802 still being down from bad FG valve issue.
Action Taken Continuing to attempt to correct the bad FG valve on 1802 T/C
Daily Volume (MSCF)
6358
15-161 Flare Relief 05/28/2015 12:00:00 am 4:15:00 pm 975 min No No Yes BP1\DONATR
j 4305)
Determination Cause Due to 1802 TIC being still shutdown, STV gas was flared from the COSD and IP Gas flared from the IP Suction Scrubber.
Action Taken 1802 T/C was repaired, one start, and flare relief was stopped.
Daily Volume (MSCF)
4305
15-163 Flare Relief 05/29/2015 8:25:00 am 10:15:00 am 110 min No No Yes BP1\DONATR
485
Determination Cause Due to 1802 TIC being shutdown, flaring of STV and IP gas off the COSD and IP Suction Scrubber.
Action Taken Completed the adjustments on 1802 TIC and started the compressor.
15-163 Controlled Blowdown 05/29/2015 8:25:00 am 8:30:00 am 5 min No No Yes BP1\DONATR
3
Determination Cause 1802 T/C normal stop for IGV adjustment on the GG after initial start the day prior.
Action Taken Completed the blowdown sequence.
RECEIVE®
JUN 16 2015
AOGCC
Total Volume (MSCF) 19512
Generated 06/08/2015 8:53:39AM Page 7 of 10
From: AK, OPS PCC EOC TL fmailto•AKOPSPCCEOCTLObp.com]
Sent: Monday, November 02, 2015 2:55 PM
To: Loepp, Victoria T (DOA)
Subject: RE: PBU Flaring Events
Victoria,
I have added the comments you requested below for each line.
Thank You
David Spall (Alternate—Jennifer Blake)
PCC/EOC Production Optimization Team Lead
907-659-4472 Office
219-689-4036 Cell
david.spall bp.com
From: Loepp, Victoria T (DOA) [mailto•victoria.loepp( alaska.gov]
Sent: Wednesday, October 21, 2015 1:58 PM
To: AK, OPS PCC EOC TL
Subject: RE: PBU Flaring Events
See additional events:
From: Loepp, Victoria T (DOA)
Sent: Wednesday, October 21, 2015 1:51 PM
To: AK, OPS PCC EOC TL (AKOPSPCCEOCTLColbp.com)
Subject: PBU Flaring Events
In reference to the following events:
Facility Dates Amt Flared, MSCFD Reason
1. FS -3 5/26-5/28/15 16226 Planned 1802 T/C down, flaring STV
and IP gas Issues with the machine, blew it down, they struggled with several additional restarts
and finally got 1802 to restart.
2. CGF 4/1/15 48066 Unplanned 1805 T/C down, stabilizers
overpressure to flare This was an unplanned issue and they flared to stabilize the plant, they
were able to reload 1805 and get the plant stabilized to stop the flaring.
3. FS -2 4/1-4/5/15 28957 Planned 1801 T/C shutdown for
planned maintenance This was planned maintenance and to keep the plant from going
completely down during the colder temperatures they had to flare
4. FS -1 8/25/15 18944 Unplanned 1803 T/C shutdown, 2nd
stage nozzles There was problem associated with 2nd stage nozzle/clevis slop (2%) they Shut in
wells 2-8, 2-34, 2-19, 2-21, 18-11, 2-6, 2-28, 2-22 to stop the flaring.
5. CGF 8/25/15 35569 Unplanned Flared stabilizer overhead
after TAPS outage, Low rate issues coming out of the TAPs outage, They were able to start the
MI Machine which closed the flare valves.
For each event, explain what happened and what measures were taken to mitigate flaring such as shut
in production. If production was not shut in, why not?
Thanx,
Victoria
Victoria Loepp
Senior Petroleum Engineer
State of Alaska
Oil 8 Gas Conservation Commission
STATE OF ALASKA
ALASKA OIL AND GAS CONSERVATION COMMISSION
ailsi 1TV 0=0nRT nF PRnnuCEn GAS DISPOSITION
1. Facility Number 2 Facility Name
0290000030 PBU FS 3
Disposition
3. Field
PBU - EOA
Volume MCF
4. Operator 5. Month/Year of Disposition
BP June -2015
20. For production from multiple pools, list contribution or each pool as a percent of
Total Volume.
6. Sold
U
Pool Name Pool Cade Percent
PRUDHOE 640150 100.00
7. Reinjected
0
8. Flared or vented 1 hour or less
620
9. Flared or vented more than 1 hour (see inslr.)
5,690
10. Pilot and Purge
33,418
11. Assist Gas
12,301
12. Fuel gas used in lease operations.
780,084
Official Use Only
13. Other (see instructions)
0
Authorization >1 hr:
Safety
�rio � rJ
MCF
14. TOTAL VOLUME (ITEMS 6-12)
832,113
Lease Use
MCF
15. NGL Gas Equivalent
0
Conservation
MCF
16. Purchased gas
0
Waste:
MCF
9 -2 —/5 -
/5Commissioner
17. Transferred from: CGF
740,332
Commissioner Date
18. Transferred to: (Express as a negative #) CGF
-24,110,558
19. Remarks:
I hereby certify that the foregoing is true and correct to the best of my knowledge.
%/�
Signature CL /!cA Qk j Title Manager Production Taxes and Royalties Alaska
Note: All volumes must be corrected
to pressure of 14.65 psia and to a
temperature of 60o F. Authority 20
AAC25.235.
��/
Printed Name Diane Colley Phone (907) 564-5775 Date 3. /.
Form 10-422 Rev. 5/2009 INSTRUCTIONS ON REVERSE SIDE Submit in Duplicate
BP EXPLORATION (ALASKA) INC.
PRUDHOE BAY UNIT - FS -3
GAS FLARING INCIDENT REPORT
June 2015
Unplanned Events less than or equal to 1 hour
DATE TIME VOLUME DESCRIPTION OF INCIDENT & CAUSE ACTION TAKEN TO ELIMINATE CAUSE
6/12/2015 0200-0205 240 Not required for unplanned events <= 1 hr Not required for unplanned events <= 1 hr
TOTAL 240
Page 9
DATE
TIME
VOLUME DESCRIPTION OF INCIDENT &CAUSE
ALI IVIV IANCIV IV LLIIYIIIYAIG a.elvac
6/9/2015
0542-1130
1,691 See attachments
See attachments
TOTAL
1,691
Planned Events Less Than or Equal 1 Hour AND <= 5,000 mcf
DATE
TIME
VOLUME DESCRIPTION OF INCIDENT & CAUSE
ACTION TAKEN TO ELIMINATE CAUSE
6/6/2015
0200-0210
80 See attachments
See attachments
6/7/2015
1422-1425
60
6/8/2015
0120-0125
240
TOTAL
380
Planned Events Exceeding 1 Hour OR > 5,000 mcf
DATE
TIME
VOLUME DESCRIPTION OF INCIDENT & CAUSE
ACTION TAKEN TO ELIMINATE CAUSE
6/6/2015
0220-0420
1,083 See attachments
See attachments
6/7/2015
1236-1422
507
6/8/2015
0140-0340
834
6/8/2015
1415-1615
208
6/26/2015
1313-1713
1,367
TOTAL
3,999
7/15/2015
3:53 PM
BP EXPLORATION )ALASKA) INC.
PRUDHOE BAY UNIT - FS -3
GAS FLARING INCIDENT REPORT
June 2015
Page 10
7/15/2015
3:53 PM
TOTAL
Unplanned Events < 1 Hour
240
Unplanned Events > 1 Hour
1,691
Planned Events < 1 hour and not
380
exceeding 5,000 MCF
Planned Events> 1 hour or
3,999
exceeding 5,000 MCF
Pilot Purge
33,418
Assist
12,301
TOTAL FLARED VOLUME
52,029
Page 10
7/15/2015
3:53 PM
Flare Start Date 06/01/2015
Flare End Date 06/30/2015
FS3 Flare Report
Total Volume (MSCF) 6310
Report
Daily Volume (MSCF)
567
15-179 Controlled Blowdown 06/08/2015 1:20:00 am 1:25:00 am
Numbe System Date StartTime
Stop Time
Duration Intemlittent
Black Smoke Planned
Reported By
Volume
15-174 Controlled Blowdown 06/06/2015 20000 am
2:10:00 am
10 min No
No Yes
BPIMELBORD
80
Determination Cause TC 1804 shutdown for planned maintenance
15-179 Controlled Blowdcwn 06/08/2015 1:40:00 am 3:40:00 am
120 min
No No
Action Taken 1804 Completed shutdown.
834
Determination Cause T\C 1806 spin cooling
15-174 Controlled Blowdown 06/06/2015 2:20:OOam
4:20:00 am
120 min No
No Yes
BP1\WELBORD
1083
Determination Cause T\C 1804 spin cooling
120 min
No No
Yes BP7\BOUWKA
208
Determination Cause 1806 AL T\C system doing waterwash.
Action Taken Completed spin cooling.
Action Taken Completed water wash.
Daily Volume (MSCF)
1163
15-176 Controlled Blowdown 06/07/2015 12:36:00 pm
2:22:00 pm
106 min No
No Yes
BP1\WELBORD
507
Determination Cause 1804 Water wash spin
1591
Determination Cause STV -IP T\C 1802 shutdown due to a problem associated with
hole in lube oil line.
Action Taken Completed water wash
15-176 Controlled Blowdown D6/07/2015 2:22:00 pm
2:25:00 pm
3 min No
No Yes
BP7\WELBORD
60
Determination Cause 1804 shut down post water wash
Action Taken Completed shutdown
15-211 Other 06/26/2015 1:13:00 pm 5:13:00 pm 240 min No No Yes BP1\DONATR
Determination Cause To troubleshoot the STV Flare Sump level transmitter, 1802 TIC was idled to allow STV Flare to build a liquid level in the sump.
Action Taken Completed the level fill of STV Flare liquid in the sump and sped 1802 TIC to normal speed.
Daily Volume (MSCF)
1367
1367
Total Volume (MSCF) 6310
Generated 07102/2015 3:52:31 PM Page 8 of 12
Daily Volume (MSCF)
567
15-179 Controlled Blowdown 06/08/2015 1:20:00 am 1:25:00 am
5 min
No No
Yes BP1\WELBORD
240
Determination Cause T\C 1806 shutdown for planned maintenance
Action Taken Completed shutdown
15-179 Controlled Blowdcwn 06/08/2015 1:40:00 am 3:40:00 am
120 min
No No
Yes BP1\WELBORD
834
Determination Cause T\C 1806 spin cooling
Action Taken Completed spin cooling limit
15-179 Controlled Blowdown 06/08/2015 2:15:00 pm 4:15:00 pm
120 min
No No
Yes BP7\BOUWKA
208
Determination Cause 1806 AL T\C system doing waterwash.
Action Taken Completed water wash.
Daily Volume (MSCF)
1282
15-180 Controlled Blowdimn 06/09/2015 5:42:00 am 11:30:00 am
348 min
No Yes
No BP1\BOUWKA
1591
Determination Cause STV -IP T\C 1802 shutdown due to a problem associated with
hole in lube oil line.
Action Taken Completed shutdown & repairs.
Daily Volume (MSCF)
1691
15-211 Other 06/26/2015 1:13:00 pm 5:13:00 pm 240 min No No Yes BP1\DONATR
Determination Cause To troubleshoot the STV Flare Sump level transmitter, 1802 TIC was idled to allow STV Flare to build a liquid level in the sump.
Action Taken Completed the level fill of STV Flare liquid in the sump and sped 1802 TIC to normal speed.
Daily Volume (MSCF)
1367
1367
Total Volume (MSCF) 6310
Generated 07102/2015 3:52:31 PM Page 8 of 12
Hunt, Jennifer L (DOA)
From: AK, OPS PCC EOC TL <AKOPSPCCEOCTL@bp.com>
Sent: Sunday, June 07, 2015 5:45 PM
To: Hunt, Jennifer L (DOA)
Cc: Loepp, Victoria T (DOA); Castano, Alejandra; Benson, Gary A; Arthur, Gregory; AK, HSSEE
Env Adv West; AK, OPS GC3&PCC OSM; Barton, Kim; AK, OPS FS3 Facility OTL; AK, OPS
FS3 OSM
Subject: Flaring Event at
To: Jennifer Hunt, AOGCC CC: Victoria Ferguson, AOGCC
iennifer.hunt(a)alaska.gov victoria ferguson(o)alaska.aov
From: David Spall, GPB Production Optimization Team Leader
A flaring event occurred at FS3 starting at 06/06/2015 02:20 and stopping at 06/06/2015 04:20 with a volume of 1083
(MSCF). The event lasted for 120 minutes and was due to T/C 1804 spin cooling. The event stopped when the spin
cooling was completed.
Thanks,
Dave
David Spall (Alternate —Jennifer Blake)
PCC/EOC Production Optimization Team Lead
907-659-4472 Office
219-689-4036 Cell
david.spall@bp.com
Hunt, Jennifer L (DOA)
From: AK, OPS PCC EOC TL <AKOPSPCCEOCTL@bp.com>
Sent: Monday, June 08, 2015 5:41 PM
To: Hunt, Jennifer L (DOA)
Cc: Loepp, Victoria T (DOA); Castano, Alejandra; Benson, Gary A; Arthur, Gregory; AK, HSSEE
Env Adv West; AK, OPS GC3&PCG OSM; Borton, Kim; AK, OPS FS3 Facility OTL; AK, OPS
FS3 OSM
Subject: Flaring Event atm]
To: Jennifer Hunt, AOGCC CC: Victoria Ferguson, AOGCC
iennifer.hunt(o alaska.aov victoria.ferouson (dalaska.aov
From: David Spall, GPB Production Optimization Team Leader
A flaring event occurred at FS3 starting at 06/07/2015 12:36 and stopping at 06/07/2015 14:22 with a volume of 507
(MSCF). The event lasted for 106 minutes and was due to T/C 1804 water wash spin. The event stopped when the water
wash was completed.
A flaring event occurred at FS3 starting at 06/07/2015 14:22 and stopping at 06/07/2015 14:25 with a volume of 60
(MSCF). The event lasted for 5 minutes and was due to T/C 1804 shut down post water wash. The event stopped when
the shutdown was completed.
A flaring event occurred at FS3 starting at 06/08/2015 01:20 and stopping at 06/08/2015 01:25 with a volume of 240
(MSCF). The event lasted for 5 minutes and was due to T/C 1806 shut down for planned maintenance. The event
stopped when the shutdown was completed.
A flaring event occurred at FS3 starting at 06/08/2015 01:40 and stopping at 06/08/2015 03:40 with a volume of 834
(MSCF). The event lasted for 120 minutes and was due to T/C 1806 spin cooling. The event stopped when the spin
cooling was completed.
A flaring event occurred at FS3 starting at 06/08/2015 14:15 and stopping at 06/08/2015 16:15 with a volume of 208
(MSCF). The event lasted for 120 minutes and was due to T/C 1806 water wash. The event stopped when the water
wash was completed.
Thanks,
Dave
David Spall (Alternate —Jennifer Blake)
PCC/EOC Production Optimization Team Lead
907-659-4472 Office
219-689-4036 Cell
david.spall@bp.com
Hunt, Jennifer L (DOA)
From: AK, OPS PCC EOC TL <AKOPSPCCEOCTL@bp.com>
Sent: Wednesday, June 10, 2015 3:17 PM
To: Hunt, Jennifer L (DOA)
Cc: Loepp, Victoria T (DOA); Castano, Alejandra; Benson, Gary A; Arthur, Gregory; AK, OPS
GC3&PCC OSM; Borton, Kim; AK, OPS FS3 Facility OTL; AK, OPS FS3 OSM; AK, HSSEE
Env Adv East
Subject: Flaring Event a4w black smoke event
To: Jennifer Hunt, AOGCC CC: Victoria Loepp, AOGCC
iennifer.hunt(dalaska.cov Victoria. loeppCo alaska.gov
From: David Spall, GPB Production Optimization Team Leader
A flaring event occurred at FS3 starting at 06/09/2015 05:42 and stopping at 06/09/2015 11:30 with a volume of 1691
(MSCF). The event was a black smoke event. The event lasted for 348 minutes and was due to STV -IP T\C 1802
shutdown, due to a problem associated with a hole in the lube oil line. The event stopped when the shutdown and repairs
were completed.
Thanks
Dave
David Spall (Alternate —Jennifer Blake)
PCC/EOC Production Optimization Team Lead
907-659-4472 Office
219-689-4036 Cell
david.spall bp.com
wor q a�elq'aa;!uuar
bOZ9-0£g (LOO IIa3
ZLbb-6S9 (L06) a3!l}O
(pods p!nno;/n) peal weal uo!;ez!w!;d0 uo!;onpad 303/33d
avn/g aaf!uuar
smuegl
peads lewiou o; pewn;al seen Z08L 0/i pue pa;aldwoo seen
6u!;oogs9lgna; ag; uagm peddo;s;uana agi 'Ja;;!wsueIl lanai dwnS GJe1H niS ag; uo VOm 6u!;oogsalgna; jo; dwns
ag; u! lana) pmb!l pl!nq o; aieli AAS ag; Mope o; ZOg L O/l 6wlp! o; anp seen pue sa;nu!w OqZ JO; pa;sel;uana agi '(dOSW)
L9EL;o awnlon a q;!M EL:LL 9LOZ/9Z/90;e bu!ddo;s pue £L £L 9LOZ/9Z/90;e 6u!ue;s ESd le pajin000;uana 6uueg V
japeel weal uogez!wgd0 uo!;onpad 9d0 '9MO J91!uu9r :wwH
no eqsele uosn aa) euo;o!n A0b,eMseleglunq jalluua_
OOOOV 'uosn6aa=I eu0101n :00 OOE)OV ';unH Ja;!uuar 01
e;uan3 6u!aelj :;:)afgns
WSO £S3
SdO ")IV '110 411Je3 £S3 SdO ")IV'w!N 'uoIJog ASO 33d'g£39 SdO "SIV "saM APV ^u3
33SSH "AV 'tiobaj0 'jngjjv 'V i0eg 'uosuag :eapuefalV 'oue;sea'(VO(J) 1 e!ao;o!A 'ddaol
(VOO) l aa;!uuaf';unH :Ol
WV LT:9 STOZ "6Z aunf'/(epuow :;uas
<wo:)'dgpn 1130333dSdO)IV> ll 303 33d SdO "SIV :Wojj
(VO(3) l aa})uuaf "7unH
STATE OF ALASKA
ALASKA OIL AND GAS CONSERVATION COMMISSION
FACILITY REPORT OF PRODUCED GAS DISPOSITION
1. Facility Number 2. Facility Name
0290000030 PBU FS 3
Disposition
3. Field
PBU - EOA
Volume MCF
4. Operator 5. Monlh/Year of Disposition
BP July -2015
20. Forproduction from multiple pools, list contribution of each pool as a percent of
Total Volume.
6. Sold
U
Pool Name Pool Code Percent
7. Reinjected
0
PRUDHOE 640150 100.00%
8. Flared or vented 1 hour or less
175
9. Flared or vented more than 1 hour (see instr.)
0
10. Pilot and Purge
30,946
11. Assist Gas
245
12. Fuel gas used in lease operations.
944,843
13. Other (see instructions)
0
Official Use Only
Authorization>1 hr:
Safety
MCF
14. TOTAL VOLUME (ITEMS 6.12)
976,209
Lease Use
MCF
15. NGL Gas Equivalent
0
Conservation
MCF
16. Purchased gas
0
Waste:
MCF
17. Transferred from: CGF
975,789
Commissioner Date
18. Transferred to: (Express as a negative #) CGF
-32,776,939
19. Remarks:
I hereby certify that the foregoing is true and correct to the best of my knowledge.
,y,�/ //I%
Signature b(.Uf DL C�10& Tige Manager Production Taxes and Ro allies Alaska
Note: All volumes must be corrected
to pressure of 14.65 psla and to a
temperature of 60o F. Authority 20
AAC25.235.
tl
Printed Name Diane Colley Phone (907) 564-5775 Date
Form 10-422 Rev. 512009 INSTRUCTIONS ON REVERSE SIDE Submit in Duplicate
STATE OF ALASKA
ALASKA OIL AND GAS CONSERVATION COMMISSION
Peru iTv RFpnRT OF PRODUCED GAS DISPOSITION
1. Facility Number 2. Facility Name
0290000030 PBU FS 3
Disposition
3. Field
PBU - EOA
Volume MCF
4. Operator 5. MonlhNear of Disposition
BP 1 August -2015
20. For production from multiple pools, list contribution of each pool as a percent of
Total Volume.
6. Sold
0
Pool Name Pool Code Percent
PRUDHOE 640150 100.00%
7. Reinjected
0
8. Flared or vented 1 hour or less
396
9. Flared or vented more than 1 hour (see instr.)
246
10. Pilot and Purge
31,012
11. Assist Gas
360
12. Fuel gas used in lease operations.
866,196
Official Use Only
13. Other (see instructions)
0
Authorization>1 hr:
Safety
2
MCF
14. TOTAL VOLUME (ITEMS 6-12)
898,210
Lease Use
MCF
15. NGL Gas Equivalent
0
Conservation
MCF
16. Purchased gas
Waste.
MCF
Commissioner Date
17. Transferred from: CGF
897,208
18. Transferred to: (Express as a negative #) CGF
-30,206,732
19. Remarks:
I hereby certify that the foregoing is true and correct to the best of my knowledge.
I
�Signature IIiIYLI Title Manager Production Taxes and Royalties Alaska
,-
Printed Name Diane Colley Phone (907) 564-5775 Date
Note: All volumes must be corrected
to pressure of 14.65 psis and to a
temperature of 60o F. Authority 20
AAC25.235.
Form 10-422 Rev. 5/2009 INSTRUCTIONS ON REVERSE SIDE Submit in Duplicate
BP EXPLORATION (ALASKA) INC.
PRUDHOE BAY UNIT- FS -3
GAS FLARING INCIDENT REPORT
August 2015
DESCRIPTION OF INCIDENT & CAUSE
Not required for unplanned events <= 1 hr
TOTAL 0
DATE TIME VOLUME DESCRIPTION OF IN
8/25/2015 0935-1105 117 See attachments
TOTAL 117
Not required for unplanned events <= 1 hr
See attachments
Planned Events Less Than or Equal 1 Hour AND <= 5,000 mcf
DATE TIME
VOLUME DESCRIPTION OF INCIDENT & CAUSE
ACTION TAKEN TO ELIMINATE CAUSE
8/16/2015 1047-1114
64 See attachments
See attachments
8/16/2015 1238-1248
32
8/21/2015 0230-0235
240
8/21/2015 0412-0415
60
TOTAL
396
Planned Events Exceeding 1 Hour OR > 5,000 mcf
DATE TIME
VOLUME DESCRIPTION OF INCIDENT & CAUSE
ACTION TAKEN TO ELIMINATE CAUSE
8/16/2015 1258-1440
129 See attachments
See attachments
TOTAL
129
TOTAL
Unplanned Events < 1 Hour
0
Unplanned Events > 1 Hour
117
Planned Events < 1 hour and not
396
exceeding 5,000 MCF
Planned Events > 1 hour or
129
exceeding 5,000 MCF
Pilot Purge
31,012
Assist
360
TOTAL FLARED VOLUME
32,014
Page 7
9/11/2015
10:38 AM
O l 40 L abed
WVZO'Lb-6 9LOZ/Z0/60 P9leJaU0S
ZV9 (dOSW) awnlOA 110101
LLL (joSW) awnlo/v RIIeO
lo aN W uoilezunssa/dap ay1 palaldwoo uaMel uollPV
Heal Weis ayl Meda/ of peinswidap pue umopinys sem 10 ayl 9064 u! AVYLEj 8AIVA 0S310 ayl uo Meal Ovals a Pey gull uowwoo o/84L 88neZ) uolleulwlalaO
LLL 211VN00\Ld8 ON ON ON ww06 we00:S0:LL We00:S8:6 SLOZ/9Z/80 WmOPmOISPellaluo0 WZ-9L
006 (joSW) awnloA A11e0—
amsswdap umop )nys lewjou palaldwoO bOBL uaMel uol;dy
uopejwd sdVl 101 se6 Shc JO Moel PL enp umop lnys pue polpi sem b08L asneo uopeulLweloo
09
H3NSPJVOLLd8
VDA
ON
ON WIMS we oo:9Vt, We00:ZLb SIOZ4Z/80 UxOpmo18P81PID1uo0 _ZLZ-9L
vmop lnys ansswdap lewlou palaldwoo 908 uaMel uol;OV
o6elno SdVlloJu Mnys AllenueW9o8t asnLDuogeulwlalao
o9Z
H3NS8V9\Ld8
saA
ON
ON ww 9 we 00:98:Z we OO:OE:z 9WZ/LZ/80 u Pmolo pellonuo0 ZLZ-9 L
9zz
(dOSW)awnloAAlleo-
'gleg ayl 01 l0 0/BbL ayl to uopezlJnssatlap ayl Palaldwop UaMel U01;ptI
uopellelsu! 1pl Bid 10 0411ol umopinys VLSO pounwoadep sem to 0841 asneo bolleulwla;all
6ZL
N1VN00\Lde
saA
ON
ON ulw ZOL wd 00:00,:Z wd Oo:BS:ZL 9LOZ/9L/80 WADWISP IPpuoO _ L9Z-SL
lsLB wayoleo 6nIS ayl
of uOgezpnssa/dap aslm dais pip pue 10 0/81?L uo ajeU of Bu!oB peddolS uaMel uoyoV
uopelpsw lib Bid
10 04L jol umopinys 6LS0 iol weU of uogezunssaidep lepiul to o/86L esne3 uopemLuu8jaa
ze
?J1VN001\Ld8
88/,
ON
ON upu OL wd00:80:ZL wd00:8E:Zl 9LUZ/9L/90 WAOWOI9P811QJWOO L9Z-9L
gull uowwoo OYL Jo umop molt' ayi pololdwoo uaMel UO1
uoilellelsul l!M 6u!661d gull uowwoo 04L joJ Wom Bwwoo do /ol pa nsswcap ouil uowwoo 04L asneo uolleuluualaU
49
NIVNOMWIS
saA
ON
ON uiw LZ we00:b L:LL we00:Lb:OL 91,13ZNL/80 umopmoIGRIIaluo0 L9Z-9L
awnloA A8 payodaa Pauueld allowS >I0e18 3u lUji uejul uollelnp ew!1 dOIS awIL VOLS alep wo;sAS ogwnN
yodaa
Z49 (dOSW) awnloA lelol
alodab ale).1 £Sd
SLOZ/LE/90 aleo PU3 a/elj
S mo/90 oleo Vels aJel3
Hunt, Jennifer L (DOA)
From: AK, OPS PCC EOC TL <AKOPSPCCEOCTL@bp.com>
Sent: Tuesday, August 18, 2015 10:44 AM
To: Hunt, Jennifer L (DOA)
Cc: Loepp, Victoria T (DOA); Castano, Alejandra; Benson, Gary A; Arthur, Gregory; AK, OPS
GC3&PCC OSM; Martin, Nelson D; AK, HSSEE Env Adv East; AK, OPS FS3 Facility OTL; AK,
OPS FS3 OSM
Subject: Flaring Event at FS3
To: Jennifer Hunt, AOGCC CC: Victoria Loepp, AOGCC
iennifer hunt@alaska.00v Victoria loepo a)alaska.00v
From: Jennifer Blake, GPB Production Optimization Team Leader
A flaring event occurred at FS3 starting at 08/16/2015 12:58 and stopping at 08/16/2015 14:40 with a volume of 129
(MSCF). The event lasted for 102 minutes and was due to the depressurization of 14B/C commonline in preparation for
the DS 14 shutdown to install pigging kit. The Flaring stopped when the depressurization was completed.
Thanks,
Jennifer Blake
PCC/EOC Production Optimization Team Lead (alt David Spall)
Office (907) 659-4472
Cell (907) 830-6204
Jennifer.blake@bp.com
STATE OF ALASKA
ALASKA OIL AND GAS CONSERVATION COMMISSION
Peru 1Tv RFPnRT CIF PRODUCED GAS DISPOSITION
1. Facility Number 2. Facility Name
0290000030 PBU FS 3
Disposition
3. Field
PBU - EOA
Volume MCF
4. Operator 5. MonthNear of Disposition
BP September -2015
20. For production from multiple pools, list contribution of each pool as a percent of
Total Volume.
6. Sold
0
Pool Name Pool Code Percent
7. Reinjected
0
PRUDHOE 640150 100.00%
8. Flared or vented 1 hour or less
964
9. Flared or vented more than 1 hour (see instr J
900
10. Pilot and Purge
29,735
11, Assist Gas
4,068
12. Fuel gas used in lease operations.
880,466
Offidlel Use Only
13. Other (see instructions)
0
Authorization >1 hr:
Safety
GfGU
MCF
14. TOTAL VOLUME (ITEMS 6-12)
916,133
Lease Use
MCF
15. NGL Gas Equivalent
0
Conservation
MCF
16. Purchased gas
0
Waste:
MCF
/?% —25 —15 -
SCommissioner
17. Transferred from: CGF
910,197
Commissioner Date
18. Transferred to: (Express as a negative #) CGF
-27,989,899
19. Remarks:
I hereby certify that the foregoing is true and correct to the best of my knowledge.
Signature am ze Title Mana er Production Taxes and Ro alties Alaska
Note: All volumes must be corrected
to pressure of 14.65 psta and to a
temperature of 60o F. Authority 20
AAC25.235.
Printed Name Diane Colley Phone (907) 564-5775 Date .
VFL I
Io1Z4 1l 5
Form 10-422 Rev. 512009 INSTRUCTIONS ON REVERSE SIDE Submit in Duplicate
BP EXPLORATION (ALASKA) INC.
PRUDHOE BAY UNIT- FS -3
GAS FLARING INCIDENT REPORT
September 2015
Not required for unplanned events <=1 hr
Not required for unplanned events <= 1 hr
TOTAL
0
Unplanned Events greater than 1 hour
DATE TIME
VOLUME DESCRIPTION OF INCIDENT & CAUSE
ACTION TAKEN TO ELIMINATE CAUSE
See attachments
See attachments
TOTAL
0
Planned Events Less Than or Equal 1 Hour AND <= 5,000 mcf
DATE TIME
VOLUME DESCRIPTION OF INCIDENT $ CAUSE
ACTION TAKEN TO ELIMINATE CAUSE
9/17/2015 1445-1450
9 See attachments
See attachments
9/28/2015 0100-0110
60
9/28/2015 1137-1230
187
9/29/2015 2200-2205
60
9/29/2015 2215-2315
458
9/30/2015 1235-1335
190
TOTAL
964
9/28/2015 0130-0330
TOTAL
Unplanned Events < 1 Hour
Unplanned Events> 1 Hour
Planned Events < 1 hour and not
exceeding 5,000 MCF
Planned Events > 1 hour or
exceeding 5,000 MCF
Pilot Purge
Assist
TOTAL FLARED VOLUME
900 See attachments
900
TOTAL
0
0
964
GDD1
29,735
4,068
35,667
See attachments
Page 6
10/15/2015
10:43 AM
Flare Start Date 09/012015
Flare End Date 09/302015
FS3 Flare Report Total Volume (MSCF) 1864
Report
Numbs System Date Start Time Stop Time Duration Intermittent Black Smoke Planned Reported By Volume
15-310 Controlled Blowdown 09/17/2015 2:45:00 pm 2:50:00 pm 5 min No No
Determination Cause 14D CL was depressured to flare to verify communication from the Facility to the Drillsite.
Action Taken Completed the communication test and shutdown the flare.
15-317 Controlled Blowdown 09/28/2015 1:00:00 am 1:10:00 am 10 min No
Determination Cause TC 1803 shutdown for planned water wash
Action Taken Completed shutdown.
15-317 Controlled Blowdown 0928/2015 1:30:00 am 3:30:00 am 120 min No
Determination Cause T\C 1803 spin cooling
Action Taken Completed spin cooling.
15-317 Controlled Blowdown 09/28/2015 11:37:00 am 12:30:00 pm 53 min No
Determination Cause T\C 1803 spin for water wash
Arfinn Taken Completed water wash.
No
liL]
res nrnwunr.,n
Daily Volume (MSCF) 9
Yes BP1\WELBORD 60
Yes BP11WELBORD 900
No Yes BPMELBORD 187
Total Volume (MSCF) 1864
Generated 10/02/2015 2:48:30PM rage 5 or a
Daily Volume (MSCF)
1147
15-319 Controlled Blowdown 09/292015 10:00:00 pm 10:05:00 pm 5 min No
No Yes BP1\WELBORD
60
Determination Cause T\C 1804 Shut down forwaterwash
Action Taken Completed shutdown.
15-319 Controlled Blowdown 09/292015 10:15:001)m 11:15:00 pm 60 min No
No Yes BPMELBORD
458
Determination Cause T\C 1804 spin cooling
Action Taken Completed spin cooling.
_
Daily Volume (MSCF)
518
15-321 Controlled Blowdcwn 09/30/2015 12:35:00 pm 1:35:00 pm 60 min No
No Yes BP1\WELBORD
190
Determination Cause TC 1804 spinning for water wash
Action Taken Completed water wash
Daily Volume (MSCF)
190
Total Volume (MSCF) 1864
Generated 10/02/2015 2:48:30PM rage 5 or a
STATE OF ALASKA
ALASKA OIL AND GAS CONSERVATION COMMISSION
FACILITY REPORT OF PRODUCED GAS DISPOSITION
1. Facility Number 2. Facility Name
0290000030 PBU IS3
Disposition
3. Field
PBU - EO A
Volume MCF
4. Operator 5. Month/Vear of Disposition
BP October -2015
20. Forproduction from multiple pools, list contribution of each pool as a percent or
Total Volume.
6. Sold
U
Pool Name Pool Code Percent
PRUDHOE 640150 100.000.
7. Reinjected
0
'
8. Flared or vented 1 hour or less
1,012
.
9. Flared or vented more than 1 hour (see instr.)
1,125
10. Pilot and Purge
31,024
11. Assist Gas
2,653
12. Fuel gas used in lease operations.
900,765
Official Use Only
13. Other (see instructions)
0
•
'
-
Authorization he
Safety
/ Z s
MCF
14. TOTAL VOLUME (ITEMS 6-12)
936,579
Lease Use
MCF
15, NGL Gas Equivalent
0
Conservation
MCF
16. Purchased gas
U
-
Waste:
MCF
•
112,
Commissioner Date
17. Transferred from: CGF
931,789
18. Transferred to'. (Express as a negative #) CGF
-23,169,698
'
19. Remarks:
I hereby certify that t e foregoing is true and correct to the best of my knowledge.
Signatures Ltn Title Manager Production Taxes and Ro aloes Alaska
Note: All volumes must be corrected
to pressure of 14.65 psis and to a
temperature of 60o F. Authority 20
AAC25.235.
(/ ,
Printed Name Diane Colley Phone (907) 564-5775 Date I r ^ ,(t�
�L
/ Z1/ 5J/ S
Form 10-422 Rev. 5/2009 INSTRUCTIONS ON REVERSE SIDE Submit in Duplicate
BP EXPLORATION (ALASKA) INC.
PRUDHOE BAY UNIT- FS -3
GAS FLARING INCIDENT REPORT
October 2015
Not required for unplanned events <= 1 hr
TOTAL 0
Events greater than 1 hour
See attachments
TOTAL 0
Not required for unplanned events <= 1 hr
ACTION TAKEN TO E
See attachments
Planned Events Less Than or Equal 1
Hour AND <= S UUU MCT
DATE
TIME
VOLUME DESCRIPTION OF INCIDENT & CAUSE ACTION TAKEN TO ELIMINATE CAUSE
10/2/2015
1820-1840
65 See attachments See attachments
10/2/2015
2030-2035
240
10/7/2015
1315-1335
67
10/7/2015
1628-1640
63
10/12/2015
0904-0935
247
10/12/2015
0947-1000
67
10/12/2015
1237-1245
18
10/12/2015
1325-1335
18
10/12/2015
1425-1435
18
10/18/2015
2215-2240
209
TOTAL
1,012
Planned Events Exceeding 1 Hour OR > 5,000 mct '
DATE TIME VOLUME DESCRIPTION OF INCIDENT &CAUSE ACTION TAKEN TO ELIMINATE CAUSE
10/2/2015 2100-2300 900 See attachments See attachments
10/4/2015 1230-1400 225
TOTAL 1,125
Page 7
11/16/2015
3:35 PM
BP EXPLORATION (ALASKA) INC-
PRUDHOE BAY UNIT - FS -3
GAS FLARING INCIDENT REPORT
October 2015
Page 8
11/16/2015
3:35 PM
TOTAL
Unplanned Events < 1 Hour
0
Unplanned Events> 1 Hour
0
Planned Events < 1 hour and not
1,012
exceeding 5,000 MCF
Planned Events > 1 hour or
1,125
exceeding 5,000 MCF
Pilot Purge
31,024
Assist
2,653
TOTAL FLARED VOLUME
35,814
Page 8
11/16/2015
3:35 PM
FlareStartDate 1010112015
Flare End Date 10/31/2015
FS3 Flare Report Total Volume (MSCF) 2137
Report
Numbs System Date Start Time Stop Time Duration Intermittent Black Smoke Planned Reported By Volume
15-322 Controlled Blowdown 10/02/2015 6:20:00 pm 6:40:00 pm 20 min No No Yes BP1\WELBORD 65
Determination Cause Depressured 14D Common Line
Action Taken Completed depressuring.
15-322 Controlled Blowdown 10/02/2015 8:30:00 pm 8:35:00 pm 5min No
No
Yes BP1\WELBORD
240
Determination Cause T\C 1806 shutdown for planned maintenance
Action Taken Completed shutdown.
15-322 Controlled Blowdown 10/02/2015 9:00:00 pm 11:00:00 pm 120 min No
No
Yes BPI\WELBORD
900
Determination Cause T\C 1806 spin Cooling
Action Taken Completed spin cooling.
Daily Volume (MSCF)
1205
15-325 Controlled Blowdown 10/04/2015 12:30:00 pm 2:00:00 pm 90 min No
No
Yes BP1\WELBORD
225
Determination Cause 1806 starter spinning for water wash
Action Taken Completed water wash
Daily Volume (MSCF)
225
15-329 Controlled Slowdown 10/07/2015 1:15:00 pm 1:35:00 pm 20 min No
No
Yes BP1\DONATR
67
Determination Cause 14D Cl -was depressured to flareto get positive isolation on the pig receiver
to remove the
ILI pig due to leaky isolation valves.
Action Taken Completed the depressurization of 14D.
15-329 Controlled Blowdown 10/07/2015 4:28:00 pm 4:40:00 pm 12 min No
No
Yes BPI\DONATR
63
Determination Cause 14D CL was depressured to flare to get positive isolation on the pig receiver
to remove the
cleaning pig due to leaky isolation valves.
Action Taken Completed the depressurization of 140 CL.
Daily Volume (MSCF)
130
15-336 Controlled Blowdown 10/12/2015 9:0400 am 9:35:00 am 31 min No
No
Yes BP1\DONATR
247
Determination Cause 14BC Cl -was depressured for DS14 SD for 14D CL pigging kit removal.
Action Taken Completed the depressurization of the 14BC CL.
15-336 Controlled Blowdown 10/12/2015 94700 am 10:00:00 am 13 min No
No
Yes BP100NATR
67
Determination Cause 14D CL was depressured to flare for the pigging kit removal
Action Taken Completed the depressurization.
15-336 Controlled Blowdown 10/12/2015 12:37:00 pm 12:45:00 pm 8 min No No
Determination Cause 14D CL was purged with nitrogen and relieved to flare for pigging kit removal.
Action Taken Completed the purge. 1 of 3 purges.
15-336 Controlled Slowdown 10/12/2015 1:25:00 pm 1:35:00 pm 10 min No No
Determination Cause 14D CL was purged with nitrogen and relieved to flare for pigging kit removal.
Action Taken Completed the purge. 2 of 3 purges.
15-336 Controlled Blowdown 10/12/2015 2:25:00 pm 2:35:00 pm 10 min No No
Determination Cause 14D CL was purged with nitrogen and relieved to flare for pigging kit removal.
Action Taken Completed the purge. 3 of 3 purges.
15-343 Controlled Blowdown 10/18/2015 10:15:00 pm 10:40:00 pm 25 min No No
Determination Cause Depressured common line 13D after gas sweep for facility maintenance.
Yes BP1\DONATR 18
Yes BPI\DONATR 18
Yes BP1\DONATR 18
Daily Volume (MSCF)
Yes BPI\GARSKEH
368
209
Generated 11/06/2015 3:25:34PM Page 9 of 12
FlareStartDate 10/01/2015
Flare End Date 10/31/2015
Action Taken Common line depmssuled.
Daily Volume (MSCF) 209
Total Volume (MSCF) 2137
Generated 11/05/2015 3:25:34PM Page 10 of 12
STATE OF ALASKA
ALASKA OIL AND GAS CONSERVATION COMMISSION
FACILITY REPORT OF PRODUCED GAS DISPOSITION
1. Facility Number
0290000030
2. Facility Name
PBU FS 3
3. Field
PBU - EOA
4. Operator
BP
5. MonthNear of Disposition
November -2015
Disposition
Volume MCF
20. For production from multiple pools, list contribution of each pool as a percent of
Total Volume.
6. Sold
0
Pool Name Pool Code Percent
7. Reinjected
0
PRUDHOE 640150 100.00%
8. Flared or vented 1 hour or less
0
9. Flared or vented more than 1 hour (see instr.)
0
10. Pilot and Purge
29,888
11. Assist Gas
5
12. Fuel gas used in lease operations.
932,342
13. Other (see instructions)
O
Official Use Only
Authorization >1 hr:
Safety
MCF
14. TOTAL VOLUME (ITEMS 6-12)
962,235
Lease Use
MCF
15. NGL Gas Equivalent
0
Conservation
MCF
16. Purchased gas
0
Waste:
MCF
17. Transferred from: CGF
962,230
Commissioner Date
18. Transferred to: (Express as a negative #) CGF
-23,860,643
19. Remarks:
I hereby certify that the foregoing is We and correct to the best of my knowledge.
Signature (.,([{(%/ Title Manager Production Taxes and o a ies Alaska
Note: All volumes must corrected
to pressure Of 14.65 psisis and to a
temperature of 60o F. Authority 20
AAC25.235.
Printed Name Diane Colley Phone (907) 564-5775 Date / /
Form 10422 Rev. 5/2009 INSTRUCTIONS ON REVERSE SIDE Submit in Duplicate
BP EXPLORATION (ALASKA) INC.
PRUDHOE BAY UNIT- FS -3
GAS FLARING INCIDENT REPORT
November 2015
Events less than or equal to 1 hour
Not required for unplanned events <=1 hr Not required for unplanned events <=1 hr
TOTAL 0
See attachments See attachments
TOTAL 0
Planned Events Less Than or Equal 1 Hour AND <= 5,000 mcf
DATE TIME VOLUME DESCRIPTION OF INCIDENT & CAUSE ACTION TAKEN TO ELIMINATE CAUSE
See attachments See attachments
TOTAL 0
See attachments
TOTAL
0
TOTAL
Unplanned Events < 1 Hour
0
Unplanned Events > 1 Hour
0
Planned Events < 1 hour and not
0
exceeding 5,000 MCF
Planned Events > 1 hour or
0
exceeding 5,000 MCF
Pilot Purge
29,888
Assist
5
TOTAL FLARED VOLUME
29,893
See attachments
Page 5
12/15/2015
9:52 AM
STATE OF ALASKA
ALASKA OIL AND GAS CONSERVATION COMMISSION
FACH iTY REPORT OF PRODUCED GAS DISPOSITION
1. Facility Number2. Facility Name
0290000030 PBU FS 3
Disposition
3. Field
PBU - EOA
Volume MCF
4. Operator 5. Month/Year of Disposition
BP I December -2015
20. For production from multiple pools, list contribution of each pool as a percent of
Total Volume.
6. Sold
0
Pool Name Pool Cade Percent
7. Reinjected
0
PRUDHOE 640150 100.00
S. Flared or vented 1 hour or less
1,316
9. Flared or vented more than 1 hour (see instr.)
4,068
10. Pilot and Purge
37,408
11. Assist Gas
9,342
12. Fuel gas used in lease operations.
952,522
13. Other (see instructions)
0
Official Use Only
Authorization >l hr:
Safety
MCF
14. TOTAL VOLUME (ITEMS 6.12)
1,004,656
Lease Use
MCF
15. NGL Gas Equivalent
0
Conservation
MCF
16. Purchased gas
0
Waste:
MCF
17. Transferred from: CGF
989,930
P ;4�4t'— z_1(_ /
18. Transferred to: (Express as a negative #) CGF
-27,836,615
Commissioner Date
19. Remarks:
I hereby certify that the foregoing is true and correct to the best of my knowledge.
(�ahD 7 �/t I
Signature V�(V L l/�J (/'/�//G/J Title Manager Production Taxes and Royalties Alaska
Note: All volumes must is corrected
to pressure of 14.65 psis and to a
temperature of 60o F. Authority 20
- AAC25.235.
I
Printed Name Diane Colley Phone (907) 564-5775 Date t16
Form 10-422 Rev. 5/2009 INSTRUCTIONS ON REVERSE SIDE Submit in Duplicate
BP EXPLORATION (ALASKA) INC.
PRUDHOE BAY UNIT- FS -3
GAS FLARING INCIDENT REPORT
December 2015
Unplanned Events less than or equal to 1 hour
DATE TIME VOLUME DESCRiPTIONOF INODENT&CAUSE ACTIONTAKEN TO ELIMINATE CAUSE
12/5/2015 0050-0105 156 Not required for unplanned events <= 1 hr Not required for unplanned events <= 1 hr
TOTAL 156
See attachments
See attachments
DATE TIME
TOTAL
0
Planned Events Less Than or Equal 1 Hour AND <= 5,000 mcf
DATE
TIME
VOLUME DESCRIPTION OF INCIDENT & CAUSE ACTION TAKEN TO ELIMINATE CAUSE
12/3/2015
1210-1215
3 See attachments See attachments
12/5/2015
0050-0100
60
12/10/2015
1117-1136
413
12/10/2015
1515-1530
119
12/11/2015
1300-1325
325
12/14/2015
2100-2105
240
37,408
TOTAL
1,160
DATE TIME
VULUMI: V"LKIrr IUM Ur IN
12/3/2015 1215-2115
2,460 See attachments
12/5/2015 0120-0321
902
12/14/2015 2137-2328
706
TOTAL
4,068
TOTAL
unplanned Events < 1 Hour
156
Unplanned Events> 1 Hour
0
Planned Events < 1 hour and not
1,160
exceeding 5,000 MCF
Planned Events> 1 hour or
4,068
exceeding 5,000 MCF
Pilot Purge
37,408
Assist
9,342
TOTAL FLARED VOLUME
52,134
See attachments
Page 5
1/14/2016
4A9 PM
Flare Start Date 12/01/2015
Flare End Date 12/31/2015
FS3 Flare Report Total Volume (MSCF) 5384
Report
Numbe System Date Start Time Stop Time Duration Intermittent Black Smoke Planned Reported By Volume
15-395 Controlled Blowdown 12/03/2015 12:10:00 pm 12:15:00 pm 5 min No No Yes BPI\GARSKEH 3
Determination Cause Planned maintenance of 1802 was reason for SD.
Action Taken 1802 Depressure complete.
15-395 Flare Relief 12/03/2015 12:15:00 pm 9:15:00 pm 540 min No No Yes BP1\GARSKEH 2460
Determination Cause Flared STV, IP gas while planned engine swap and other required maintenance was taking place on 1802. (No spare)
Action Taken 1802 was restarted and loaded and back in service. -
15-396 Controlled Blowdown 12/05/2015 12:50:00 am 1:00:00 am 10 min No No
Yes BP1 \GARSKEH 60
Determination Cause
1803 manual SD for maintenance.
Action Taken
Finished normal blowdown.
15-396 Other
12/05/2015 1:20:00 am 3:21:00 am 121 min No No
Yes BP1\GARSKEH 902
Determination Cause
1803 spin coolto drop wheelspece temps.
Action Taken
Did 2 hour spin cool (allotted time), then shut in.
15-403 Controlled Blowdown 12/10/2015 11:17:00 am 11:38:00 am 19 min No No
Yes BP100NATR 413
Determination Cause
Depressur AHP Separator/Scmbberto repair a leaking 1" union on the 50# FG pipe.
Action Taken
Completed the depressurization.
15-403 Controlled Blowdown 12/10/2015 3:15:00 pm 3:30:00 pm 15 min No No
Yes BP1\DONATR 119
Determination Cause
Depressured AHP Separator/Scrubber again after failed leak check on the repaired 1" Union.
Action Taken
Completed the depressurization of the vessel.
15-405 Controlled Blowdown 12/11/2015 1:00:00 pm 1:25:00 pm 25 min No No
Yes BP1\GARSKEH 325
Determination Cause
Isolated and depressured A HP separator, to realign and repair a leak on the 50# fuel gas line.
Action Taken
Completed the depressuring process.
-
15-408 Controlled Blowdown 12/14/2015 9:00:00 pm 9:05:00 pm 5 min No No
Yes BP1\GARSKEH 240
Determination Cause
Planned normal SD of 1806 for maintenance. Depressured.
Action Taken
1806 completed its normal blowdown.
15408 Flare Relief 12/14/2015 9:37:00 pm 11:28:00 pm 111 min No No
Yes BP1\GARSKEH 706
Determination Cause
Spin cool 1806 to assure it is prepped for maintenance, 113 minuets.
Action Taken
Spin cool stopped, 2 hr maximum.
Total Volume (MSCF) 5384
Generated 01/08/2016 11:15:02AM Page 4 of 7
12/7/2015
Flaring Event at FS3
Flaring Event at FS3
AK, OPS PCC EOC TL [AKOPSPCCEOCfL@bp.COrn]
Sent:Sunday, December 06, 2015 10:38 AM
To: AOGCC Reporting (DOA sponsored)
Cc: Loepp, Victoria T (DOA); Benson, Gary A [Gary.Benson@bp.com]; Arthur, Gregory [Gregory Arthur@bp.com]; Al OPS GC3&PCC
OSM [AKOPSGC3PCCOSM@BP.com]; Martin, Nelson D [Nelson.Martin@bp.com]; AK, HSSEE Env Adv East
FS3 Facility OTIL
OPS FS3 OSM
[AKOPSFS30SM@BP com7 G ov�err,,KR bin (SLR) [Rob n Gloverr@bp.com] aKain, Rachel
B[Rachel.Kain@bp.com]
To: AOGCC Reporting CC: Victoria Loepp. AOGCC
aoocc.reportina@alaska.gov
From: Jennifer Blake, GPB Production Optimization Team Leader
A flaring event occurred at FS3 starting at 12/05/2015 01:20 and stopping at 12/05/2015 03:21 with a
volume of 902 (MSCF). The event lasted for 121 minutes. The event was due to spin cooling to prepare for
planned maintenance on 1803 compressor. The flaring stopped once 1803 was cool and shutdown.
Thanks
Jennifer Blake
PCC/EOC Production Optimization Team Lead (alt David Spall)
Office (907) 659-4472
Cell (907) 830-6204
Jennifer.blake@bp.com
https:/iwebmai I a.aiwka.gov/ma%ae=Item &t= IPM.Note&id= RgAAAABKLne2zgP4SoM kepOhCxbSBwBUvQ964rjQTgygn3632GdIAAAAhhLyAABuvQ964rjQT... Ill
12!712015
Flaring Event at FS3
Flaring Event at FS3
AK, OPS PCC EOC TL [AKOPSPCCEOCTL@bp.Com]
sent:Saturday, December 05, 2015 4:20 PM
To: AOGCC Reporting (DOA sponsored)
Cc: Loepp, Victoria T (DOA); Benson, Gary A [Gary.Benson@bp.com]; Arthur, Gregory [Gregory.Arthur@bp.com]; AK, OPS GC3&PCC
OSM [AKOPSGC3PCCOSM@BP.com]; Martin, Nelson D [Nelson.Martin@bp.com]; AK, HSSEE Env Adv East
PS FS3 OSM
[AKOPSFS30SM@BP com]; G over, Robin (SLR) [Rolbin GI vty OTL er@bp.com];aKain, Rachel Bc[Rachel.Kaaiin@bp com]
To: AOGCC Reporting CC: Victoria Loepp, AOGCC
aoacc reoortinaCa)alaska Qov
From: Jennifer Blake, GPB Production Optimization Team Leader
A flaring event occurred at FS3 starting at 12/03/2015 12:15 and stopping at 12/03/2015 21:15 with a volume of 2460
(MSCF). The event lasted for 540 minutes. The event was due to planned maintenance, including an engine swap,
on 1802 compressor. The flaring stopped once 1802 was restarted and placed back in service.
Thanks
Jennifer Blake
PCC/ECC Production Optimization Team Lead (alt David Spall)
Office (907) 659-4472
Cell(907)830-6204
Jennifer.blake@bp.com
https:lAvebrnaila.alwka.gov/mat?ae=Item&t=IPM.N ote&id=RgAAAABKLne2zgP4SoM kepOhCxbsBwBU vQ964rjQTgYgn3632GdIAAAAhhLyAABUvQ964rjQT... 1/1
12/30/2015
Flaring Event at FS3
Flaring Event at FS3
AK, OPS PCC EOC TL [AKOPSPCCEOCTL@bp.com]
Senffriday, December 18, 2015 3:31 PM
To: AOGCC Reporting (DOA sponsored)
Cc: Loepp, Victoria T (DOA); Benson, Gary A [Gary.Benson@bp.com]; Arthur, Gregory [Gregory Arthur@bp.com]; AK, OPS GC3&PCC
d
OSM [AKOPSGC3PCCOSM@BP.com]; Martin, Nelson D [Nelson.Martin@bp.com]; AK, HSSEE Env Adv East
[AKHSSEEEnvAdvEast@bp.com]; AK, OPS FS3 Facility OTL [AKOPSFS3FadlityOTL@bp.com]; Glover, Robin (SLR)
[Robin.Glover@bp.com]; Kain, Rachel B [Rachel.Kain@bp.com]; AK, OPS FS3 OSM [AKOPSFS30SM@BP.Com]
From: Jennifer Blake, GPB Production Optimization Team Leader
A flaring event occurred at FS3 starting at 12/14/2015 21:37 and stopping at 12114/2015 23:28 with a volume of 706
(MSCF). The event lasted for 111 minutes and was due to a shutdown and spin cool of T/C 1806 for planned
maintenance. The event stopped when the spin cool was complete.
Thanks,
Jennifer Blake
PCC/EOC Production Optimization Team Lead (alt David Spall)
Office (907) 659-4472
Cell (907) 830-6204
Jennifer.blake@bp.com
https:/lwebmaila.alaska.gmlma/?ae=Item &t= IPM .Note&i d=RgAAAABKLne2zgP4SoM kepOhCxbSBwBUvQ964rjQTgYgn3632GdIAAAAhhLyAABU vQ964rjQT... 111