Alaska Logo
Department of Commerce, Community, and Economic Development
Alaska Oil and Gas Conservation
Commission
Loading...
HomeMy WebLinkAboutPBU GC 1 - BP Exploration (Alaska) Inc.State of Alaska AOGCC Gas Disposition Files Year: 2015 Facility: PBU GC 1 Operator: BP EXPLORATION (ALASKA) INC.     STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMMISSION FACILITY REPORT OF PRODUCED GAS DISPOSITION RECEIVED FEB 19 2015 AOGCC 1. Facility Number 0290000031 2. Facility Name PBU GC 1 3. Field PBU - WOA 4. Operator BP 5. Month/Year of Disposition January -2015 Disposition Volume MCF 20. Forproduction from multiple pools, list contribution of each pool as a percent of Total Volume. 6. Sold p Pool Name Pool Code Percent 7. Reinjected O PRUDHOE 640150 99.37% LISBURNE 640144 0.33% 8. Flared or vented 1 hour or less O MIDNIGHTSUN 640158 0.30% PT MCINTYRE 640180 0.00% 9. Flared or vented more than 1 hour (see instr.) 2,230 10. Pilot and Purge 56,913 11. Assist Gas 0 12. Fuel gas used in lease operations. 778,467 13. Other (see iinstructions)Official Use Only Authorization > 7 hr: Safety 2 Z 3 p MCF 14. TOTAL VOLUME (ITEMS 6-12) 837,610 Lease Use MCF 15. NGL Gas Equivalent 0 Conservation MCF 16. Purchased gas Waste: MCF 17. Transferred from: U Yom-- 3-2-3-15- Commissioner Date 18. Transferred to: (Express as a negative #) CGF -57,839,582 19. Remarks: I hereby certify that the foregoing is true and correct to the best of my knowledge. / J/ i) Note: All volumes must be corrected Signature a 'f /M� .f/ Title Manager Production Taxes and R alties Alaska to pressure of 14.65 psi8 and to a temperature of 60o F. Authority 20 Printed Name Diane Colle Phone (907) 564-5775 Date / AAC25.235. I/ rl- 3/f9/fS Form 10-422 Rev. 5/2009 INSTRUCTIONS ON REVERSE SIDE Submit in Duplicate BP EXPLORATION (ALASKA) INC. RECEIVED PRUDHOE BAY UNIT -GC -1 FEB 1 9 2015 GAS FLARING INCIDENT REPORT January 2015 Unplanned Events less than or equal to 1 hour DATE TIME VOLUME DESCRIPTION OF INCIDENT & CAUSE ACTION TAKEN TO ELIMINATE CAUSE Not required for unplanned events <= 1 hr Not required for unplanned events <= 1 hr TOTAL 0 Unplanned Events greater than 1 hour DATE TIME VOLUME DESCRIPTION OF INCIDENT & CAUSE ACTION TAKEN TO ELIMINATE CAUSE 1/5/2015 1235-1950 1,750 See attachments See attachments 1/6/2015 0250-0950 480 TOTAL 2,230 Planned Events Less Than or Equal 1 Hour AND <= 5,000 mcf DATE TIME VOLUME DESCRIPTION OF INCIDENT & CAUSE ACTION TAKEN TO ELIMINATE CAUSE See attachments See attachments TOTAL 0 Planned Events Exceeding 1 Hour OR> 5,000 mcf JAIL TIME VOLUME DESCRIPTION OF IN See attachments TOTAL 0 TOTAL Unplanned Events < 1 Hour 0 Unplanned Events > 1 Hour 2,230 Planned Events < 1 hour and not 0 exceeding 5,000 MCF Planned Events > 1 hour or 0 exceeding 5,000 MCF Pilot Purge 56,913 Assist 0 TOTAL FLARED VOLUME 59,143 ACTION TAKEN TO ELIMINATE CAUSE See attachments Page 7 2/12/2015 10:37 AM Flare StartDate 01/01/2015 RECEIVED Flare End Date 01/31/2015 GCI Flare Report FEB 19 2015 Total Volume (MSCF) 2230 Report AOUCC Numbs System Date StartTime Stop Time Duration Intermittent Black Smoke Planned Reported By Volume 15-5 Controlled Slowdown 01/05/2015 12:35:00 pm 7:50:00 pm 435 min Yes Determination Cause S/D K7000, lost disch. cooler fan causing high temp. severat starts Action Taken up@ 1950 15-7 Controlled Blowdown 01/06/2015 2:50:00 am 9:50:00 am 420 min Yes Determination Cause C -Bank 1st stg. PIC flare controller leaking by Action Taken Inst. techs repaired Generated 02/03/2015 8:58'.00AM No No BPIVSPRINGG 1750 . _......-....._....._... Daily Volume (MSCF) 1750 No No BP14SPRINGG 480 Daily Volume (MSCF) 480 Total Volume (MSCF) 2230 Page 5 Of 6 Hunt, Jennifer L (DOA) From: AK, OPS PCC EOC TL <AKOPSPCCEOCTL@bp.com> Sent: Saturday, January 10, 2015 12:48 PM To: Hunt, Jennifer L (DOA) Cc: Loepp, Victoria T (DOA); Roby, David S (DOA); Castano, Alejandra; Benson, Gary A; Arthur, Gregory; AK, HSSEE Env Adv West; Hauger, Wayne A; AK, OPS GC3&PCC OSM; AK, OPS PCC EOC TL; AK, OPS GC1 Facility OTL; AK, OPS GC1 OSM Subject: Flaring Events at_ To: Jennifer Hunt, AOGCC CC: Dave Roby, AOGCC CC: Victoria Ferguson, AOGCC iennifer.hunt()aalaska.gov dave.robv(rDalaska.aov victoria.ferctuson(rDalaska.o ov From: Wendy Hiester, GPB Production Optimization Team Leader A flaring event occurred at GCI starting at 01/06/2015 02:50 and stopping at 01/06/2015 09:50 with a volume of 480 (MSCF). The event lasted for 420 minutes and occurred when the C -Bank 1 st stage PIC flare controller leaked by. Flaring stopped when the repair was completed by the instrument techs. A flaring event occurred at GCI starting at 01/05/2015 12:35 and stopping at 01/05/2015 19:50 with a volume of 1750 (MSCF). The event lasted for 435 minutes and occurred when the K7000 shut down on high temperature following loss of discharge cooler fan. Flaring stopped when the compressor was successfully restarted. A flaring event occurred at GC1 starting at 12/15/2014 16:04 and stopping at 12/15/2014 17:48 with a volume of 1990 (MSCF). The event lasted for 104 minutes and occurred due to a bad PIC card on the K-7001 compressor. Flaring stopped when the repair was completed by the turbo techs. STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMMISSION FACILITY REPORT OF PRODUCED GAS DISPOSITION 1. Facility Number 0290000031 2. Facility Name RB GC 1 3. Field PBU - WOA 4. Operator BP 5. Month/Year of Disposition February -2015 Disposition Volume MCF 20. Forproduction from multiple pools, list contribution of each pool as a percent of Total Volume. 6. Sold Pool Name Pool Code Percent 7. Reinjected 0 PRUDHOE 640150 99.48% LISBURNE 640144 0.28% 8. Flared or vented 1 hour or lessMIDNIGHT 1,410 SUN 640158 0.247/6 PT MCINTYRE 640180 0.00% 9. Flared or vented more than 1 hour (see instr.) 3,960 10. Pilot and Purge 51,246 11. Assist Gas 0 12. Fuel gas used in lease operations. 678,057 13. Other (see instructions) 0 Official Use Only Authorization >1 hr: Safety � a �O / MCF 14. TOTAL VOLUME (ITEMS 6-12) 734,673 Lease Use MCF 15. NGL Gas Equivalent 0 Conservation MCF 16. Purchased gas 0 Waste: MCF 17. Transferred from: 0 18. Transferred to: (Express as a negative #) CGF -51,909,807 Commissioner Date 19. Remarks: I hereby certify that the foregoing is true and correct to the best of my knowledge. Signature _ (.,�fjt-✓� Title Manager Production Taxes ang Ro alties Alaska Note: All volumes must be corrected to pressure of 14.65 psis and to a temperature of 60o F. Authority 20 AAC25.23& Printed Name Diane Colley Phone (907) 564-5775 Date V T �- 4flo/d� Form 10-422 Rev. 5/2009 INSTRUCTIONS ON REVERSE SIDE Submit in Duplicate BP EXPLORATION (ALASKA) INC. PRUDHOE BAY UNIT -GC -1 GAS FLARING INCIDENT REPORT February 2015 Unplanned Events less than or equal to 1 hour TOTAL DATE TIME VOLUME DESCRIPTION OF INCIDENT & CAUSE ACTION TAKEN TO ELIMINATE CAUSE 2/15/2015 2340-2359 60 Not required for unplanned events <= 1 hr Not required for unplanned events <=1 hr 2/16/2015 2330-2400 530 Planned Events > 1 hour or 2/20/2015 0009-0010 10 TOTAL 600 Assist Unplanned Events greater than 1 hour TOTAL FLARED VOLUME 56,616 DATE TIME VOLUME DESCRIPTION OF INCIDENT & CAUSE ACTION TAKEN TO ELIMINATE CAUSE 2/1/2015 0920-1207 1,030 See attachments See attachments 2/3/2015 1221-1433 1,910 2/5/2015 0835-1000 10 2/18/2015 1402-2127 60 2/27/2015 0730-1530 950 TOTAL 3,960 Planned Events Less Than or Equal 1 Hour AND <= 5,000 mcf DATE TIME VOLUME DESCRIPTION OF INCIDENT& CAUSE ACTION TAKEN TO ELIMINATE CAUSE 2/5/2015 1709-1724 810 See attachments See attachments TOTAL 810 Planned Events Exceeding 1 Hour OR > 5,000 mcf DATE TIME VOLUME DESCRIPTION OF INCIDENT & CAUSE ACTION TAKEN TO ELIMINATE CAUSE See attachments See attachments TOTAL 0 Page 7 3/13/2015 2:18 PM TOTAL Unplanned Events < 1 Hour 600 Unplanned Events > 1 Hour 3,960 Planned Events < 1 hour and not 810 exceeding 5,000 VICE Planned Events > 1 hour or 0 exceeding 5,000 MCF Pilot Purge 51,246 Assist 0 TOTAL FLARED VOLUME 56,616 Page 7 3/13/2015 2:18 PM Flare StartDate 02/01/2015 Flare End Date 02/28/2015 GCS Flare Report Total Volume (MSCF) 5370 Report Numbs System Date Start Time Stop Time Duration Intermittent Black Smoke Planned Reported By Volume 15-20 Controlled Blowdown 02/01/2015 9:20:00 am 12:07:00 pm 167 min Yes No No BP1\HELMIGBJ 1030 "A" Determination Cause bank shutdown on equipment failure. Action Taken Failure identified and repaired. 15-28 Controlled Blowdown 02/03/2015 12:21:00 pm 2:33:00 pm 132 min No No No BP1\KIRSCHW 1910 Determination Cause Ips discharge psv failure Action Taken swapped psv's 15-28 Controlled Blowdown 02/05/2015 8:35:00 am 10:00:00 am 85 min No No No BP1\BROWNK 10 Determination Cause c bank 1st stage flare valve off seat Action Taken reseated flare vavle 15-28 Flare Relief 02/05/2015 5:09:00 pm 5:24:00 pm 15 min No No Yes BP1\BIFFERDL 810 J Determination Cause Took down LP Comp. K105 using too much lube oil. Brought up K-106 t Action Taken Brought other LP Compresor on line. 15-40 Flare Relief 02/18/2015 2:02:00 pm 9:27:00 pm 445 min Yes No Determination Cause Intermittent flaring caused by gas rete swings due to downstream facility issues. Action Taken None required. System self corrected 15-52 Flare Relief 02/27/2015 7:30:00 am 3:30:00 pm 480 min Yes Determination Cause Leaking C -bank tat stg. flare valve Action Taken Had to replace FV positioner No No BP1\SPRINGG 950 Total Volume (MSCF) 5370 Generated 03/08/2015 2:03:09PM Page 8 of 9 Hunt, Jennifer L (DOA) From: AK, OPS PCC EOC TL <AKOPSPCCEOCTL@bp.com> Sent: Friday, February 06, 2015 7:48 PM To: Hunt, Jennifer L (DOA) Cc: Loepp, Victoria T (DOA); Roby, David S (DOA); Castano, Alejandra; Benson, Gary A; Arthur, Gregory; AK, HSSEE Env Adv West; Hauger, Wayne A; AK, OPS GC1 OSM; AK, OPS GC1 Facility OTL, AK, OPS GC3&PCC OSM Subject: Flaring Event atow To: Jennifer Hunt, AOGCC CC: Dave Roby, AOGCC CC: Victoria Ferguson, AOGCC jennifer.huntCcD.alaska.gov dave.roby(d)alaska.gov victoria.ferouson(cDalaska.ct ov From: Jennifer Blake, GPB Production Optimization Team Leader A flaring event occurred at GC1 02/01/2015 09:20 and stopping at 02/01/2015 12:07 with a volume of 1030 (MSCF). The event lasted for 167 minutes and was due to an "A" bank shutdown on equipment failure. Flaring stopped when the equipment failure was identified and repaired. A flaring event occurred at GC1 starting at 02/03/2015 12:21 and stopping at 02/03/2015 14:33 with a volume of 1910 (MSCF). The event lasted for 132 minutes and was due to a PSV failure. Flaring stopped when the PSV was swapped. A flaring event occurred at GC1 starting at 02/05/2015 08:35 and stopping at 02/05/2015 10:00 with a volume of 10 (MSCF). The event lasted for 85 minute and was due to C Bank 151 stage Flare valve traveling off its seat. Flaring stopped when the flare valve was reseated. Please let me know if you have any questions. Thanks, Jennifer Blake PCC/EOC Production Optimization Team Lead Office (907) 659-4472 Cell (907) 830-6204 Jennifer.blake(@bp.com Hunt, Jennifer L (DOA) From: AK, OPS PCC EOC TL <AKOPSPCCEOCTL@bp.com> Sent: Saturday, February 21, 2015 6:40 PM To: Hunt, Jennifer L (DOA) Cc: Loepp, Victoria T (DOA); Roby, David S (DOA); Castano, Alejandra; Benson, Gary A; Arthur, Gregory; AK, HSSEE Env Adv West; Hauger, Wayne A; AK, OPS GCI OSM; AK, OPS GC1 Facility OTL; AK, OPS GC3&PCC OSM Subject: Flaring Event atm Categories: Attention To: Jennifer Hunt, AOGCC CC: Dave Roby, AOGCC CC: Victoria Ferguson, AOGCC Lnnifer.hunt(dalaska.gov dave.robV(c alaska.gov victoria.ferguson(a)alaska.q ov From: Jennifer Blake, GPB Production Optimization Team Leader An intermittent flaring event occurred at GC1 starting at 02/18/2015 14:02 and stopping at 02/18/2015 21:27 with a volume of 60 (MSCF). The event lasted for 445 minutes and was due to downstream facility issues causing gas rate swings. Flaring stopped when the downstream facility issues were resolved and the system self -corrected. Please let me know if you have any questions. Thanks, Jennifer Blake PCC/EOC Production Optimization Team Lead Office (907) 659-4472 Cell (907) 830-6204 Jennifer.blake @bp.com Hunt, Jennifer L (DOA) From: AK, OPS PCC EOC TL <AKOPSPCCEOCTL@bp.com> Sent: Monday, March 09, 2015 1:14 PM To: Hunt, Jennifer L (DOA) Cc: Loepp, Victoria T (DOA); Roby, David S (DOA); Castano, Alejandra; Benson, Gary A; Arthur, Gregory; AK, HSSEE Env Adv West; AK, OPS CGF OTL; AK, OPS CCP CGF OSM; Fortenberry, Christopher; AK, OPS GC3&PCC OSM Subject: RE: Gas flaring event MOW To: Jennifer Hunt, AOGCC CC: Dave Roby, AOGCC CC: Victoria Ferguson, AOGCC iennifechunt(a)alaska.gov dave.robyCcD.alaska.aov victoria.ferausonOaalaska.a ov From: Jennifer Blake, GPB Production Optimization Team Leader A flaring event, specifically a leaking flare valve, has occurred at CGF. It started on 02/18/2015 and continued through 02/21/15. Maintenance applied additional pressure to the actuator to seat the valve which temporarily stopped the leaking until the valve could be isolated and rebuilt on 3/2. Upon teardown of the valve, it was noted the cage was fine but the seats and plug needed replacement negating the need to wait 3 months for a cage replacement. The valve has been repaired and the flaring has ceased. 02/18/2015 00:01 and stopping at 02/18/2015 23:59 with a volume of 622 (MSCF). The event lasted for 1438 minutes. 02/19/2015 00:01 and stopping at 02/19/2015 23:59 with a volume of 49 (MSCF). The event lasted for 1438 minutes. 02/20/2015 00:01 and stopping at 02/20/2015 23:59 with a volume of 1513 (MSCF). The event lasted for 1438 minutes. 02/21/2015 00:01 and stopping at 02/21/2015 23:59 with a volume of 218 (MSCF). The event lasted for 1438 minutes. Thank you, Jennifer Blake PCC/EOC Production Optimization Team Lead Office (907) 659-4472 Cell (907) 830-6204 Jennifer.blake@bp.com From: AK, OPS PCC EOC TL Sent: Saturday, February 21, 2015 6:52 PM To: 'jennifer.hunt@alaska.gov' Cc: 'Loepp, Victoria T (DOA) (victoria.loepp6 alaska.gov)'; "dave.roby@alaska.gov' (dave.robv(olalaska.00v)'; Castano, Alejandra; Benson, Gary A; Arthur, Gregory; AK, HSSEE Env Adv West; AK, OPS CGF OTL; AK, OPS CCP CGF OSM; Fortenberry, Christopher; AK, OPS GC3&PCC OSM Subject: Gas flaring event at CGF To: Jennifer Hunt, AOGCC CC: Dave Roby, AOGCC CC: Victoria Ferguson, AOGCC iennifer.hunt(walaska.gov dave.roby(aalaska.gov victoria.ferguson(a)alaska.g ov From: Jennifer Blake, GPB Production Optimization Team Leader A flaring event, specifically a leaking flare valve, has occurred at CGF starting at 02/18/2015 00:01 and will be ongoing until valve repair parts are received and the valve is repaired. The leaking valve requires a cage replacement, which is an estimated 3 month lead time for the new parts. We will continue to log the event daily to record gas volumes flared and I will follow up with a phone call on Monday Thank you, Jennifer Blake PCC/EOC Production Optimization Team Lead Office (907) 659-4472 Cell (907) 830-6204 lennifer.blake@bp.com Hunt, Jennifer L (DOA) From: AK, OPS PCC EOC TL <AKOPSPCCEOCTL@bp.com> Sent: Monday, March 09, 2015 1:51 PM To: Hunt, Jennifer L (DOA) Cc: Loepp, Victoria T (DOA); Roby, David S (DOA); Castano, Alejandra; Benson, Gary A; Arthur, Gregory; AK, HSSEE Env Adv West; Hauger, Wayne A; AK, OPS GCl OSM; AK, OPS GCl Facility OTL; AK, OPS GC3&PCC OSM Subject: Flaring Event atm To: Jennifer Hunt, AOGCC CC: Dave Roby, AOGCC CC: Victoria Ferguson, AOGCC iennifer.hunt(cDalaska.00v dave.robv(U2alaska.gov victoria.ferouson( alaska.o ov From: Jennifer Blake, GPB Production Optimization Team Leader A flaring event occurred at GC1 starting at 02/27/2015 07:30 and stopping at 02/27/2015 15:30 with a volume of 950 (MSCF). The event lasted for 480 minutes and was due to a leaking C -bank 1't stage separator flare valve. Flaring stopped when the flare valve positioner was replaced. Please let me know if you have any questions. Thanks, Jennifer Blake PCC/EOC Production Optimization Team Lead Office (907) 659-4472 Cell (907) 830-6204 Jennifer.blake@bp.com STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMMISSION FACILITY REPORT OF PRODUCED GAS DISPOSITION 1. Facility Number 0290000031 2. Facility Name PBU GC 1 3. Field PBU - WOA 4. Operator BP 5. MonthNear of Disposition March -2015 Disposition Volume MCF 20. For production from multiple pools, list contribution of each pool as a percent of Total Volume, 6. Sold Pool Name Pool Code Percent 7. Reinjected O PRUDHOE 640150 99.66% LISBURNE 640144 0.22% 8. Flared or vented l hour or less 650 MIDNIGHTSUN 640158 0.12% PT MCINTYRE 640180 0.00% 9. Flared or vented more than 1 hour (see instr.) 530 10. Pilot and Purge 56,576 11. Assist Gas 0 12. Fuel gas used in lease operations. 755,852 13. Other (see instructions) 6 Official Use Only Authorization >1 hr: Safety �3 MCF 14. TOTAL VOLUME (ITEMS 6-12) 813,608 Lease Use MCF 15. NGL Gas Equivalent 0 Conservation MCF 16. Purchased gas 0 Waste: MCF 17. Transferred from: 0 18. Transferred to: (Express as a negative #) CGF -67,708,492 Commissioner Date 19. Remarks: I hereby certify that the foregoing is true and correct to the best of my knowledge. Note: All volumes must be corrected Signature Title Manager Production Taxes and Royalties Alaska to pressure of 14.65 psis and to a /. temperature of 60o F. Authority 20 `�{ Printed Name Diane Colley Phone (907) 564-5775 Date I kr AAC25.235. V T 1-- 51,11115- Form -- 51rf1lS Form 10422 Rev. 5/2009 INSTRUCTIONS ON REVERSE SIDE Submit in Duplicate BP EXPLORATION (ALASKA) INC. PRUDHOE BAY UNIT -GC -1 GAS FLARING INCIDENT REPORT March 2015 (Unplanned Events less than or equal to 1 hour DATE TIME VOLUME DESCRIPTION OF INCIDENT & CAUSE ACTION TAKEN TO ELIMINATE CAUSE 3/2/2015 0901-0907 80 Not required for unplanned events <= 1 hr Not required for unplanned events <= 1 hr 3/28/2015 1435-1535 570 TOTAL 650 DATE TIME VOLUME DESCRIPTION OF INCIDENT & CAUSE ACTION TAKEN TO ELIMINATE CAUSE 3/29/2015 1215-1410 530 See attachments See attachments TOTAL 530 Planned Events Less Than or Equal 1 Hour AND <= 5,000 mcf DATE TIME VOLUME DESCRIPTION OF INCIDENT & CAUSE ACTION TAKEN TO ELIMINATE CAUSE See attachments See attachments TOTAL 0 Planned Events Exceeding 1 Hour OR> 5,000 mcf TOTAL Unplanned Events < 1 Hour Unplanned Events> 1 Hour Planned Events < 1 hour and not exceeding 5,000 MCF Planned Events> 1 hour or exceeding 5,000 MCF Pilot Purge Assist TOTAL FLARED VOLUME VOLUME DESCRIPTION OF IN See attachments 0 TOTAL 650 530 0 0 56,576 0 57,756 See attachments Page 6 4/11/2015 4:06 PM Flare Start Date 03/01/2015 Flare End Date 03/31/2015 GC1 Flare Report Total Volume (MSCF) 1190 Report Numbs System Date Start Time Stop Time Duration Intermittent Black Smoke Planned Reported By Volume 15-81 Controlled Blowdown 03/29/2015 12:15:00 pm 2'.10-.00 pm 115 min Yes No No BP1\SPRINGG 530 Determination Cause Depressured D-95 to T -bank to repair leak @ wellpad. Action Taken Done Daily Volume (MSCF) 530 Total Volume (MSCF) 1190 Generated 04/03/2015 3.26.36PM Page 7 of 8 woo -a q @ alelq•ja;!uuar bOZ9-0£8(L06)IIaO ZLbb-6S9 (L06) aO1.40 peal weal uo!lez!w!ld0 uollOnpad 003/OOd aNn/g jafiuuar 'quegl suol;senb (ue aneg no (;I mou)l GW lei aseald aowas o; �oeq lg6naq aull pue pailedai seen deal ay; uagm paddols 6uueld 'ped llam le �eal a xg o; Nueq-1 g6noag; awlmog 960 6ulzunssajdep o; anp sem pue sa;nulw g l ! jo; pa;sel;uana agl '(dOSW) O£9 10 awnlon a g;lm Ol til 9LOZ/6Z/£0 le l5wd6o;s pue 9;:Z1 9l OZ/6Z/£0 le buluels 1.00;e pawn000;uana 6uuel; V japeal weal uollezlwlld0 uol;onpad OdO '9slel8 ja;luuar :wad Aob else a uosn ja;'euo;Oln no 'eAsele ;unq'ja;luua. 0000V 'uosn6jad euo;o!n :00 0000V 'lunH Jal!uusr :ol T09;e;uan3 6u1je13 :321 :30afgo5 WSO OOd?B£09 110 L4!IPe3 T09 SdO')IV :WSO TOO SdO ')IV 'V auAeM'ja6neH ';saM APV nu3 'tio6ajg 'ing),jV (V tieg 'uosuag'eJpuefalV 'ouelse0'(VOO) 1 euo;:)lA 'ddaol :>> (VO(l) l aa}luua('lunH :ol Wd 6b:ZT STOZ'TO I!jdV'lepsaupaM :luas <wo0'dq@u 1100300dSdO)IV> ll 003 OOd SdO 'SIV :wojd (vou) l ja;iuuar ';unH STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMMISSION FACILITY REPORT OF PRODUCED GAS DISPOSITION RECEIVED MAY 14 2015 AOGCC 1. Facility Number 0290000031 2. Facility Name PBU GC 1 3. Field PBU - WOA 4. Operator BP 5. MonthNear of Disposition I April -2015 Disposition Volume MCF 20. For production from multiple pools, list contribution of each pool as a percent of Total Volume, 6. Sold 0 Pool Name PoolCode Percent 7. Reinjected O PRUDHOE 640150 99.24% LISBURNE 640144 0.65% 8. Flared or vented 1 hour or less 4,350 MIDNIGHT SUN 640158 0.11°/ PT MCINTYRE 640180 0.00% 9. Flared or vented more than 1 hour (see instr.) 2,300 10. Pilot and Purge 54,675 11. Assist Gas 0 12. Fuel gas used in lease operations. 682,806 13. Other (see instructions) G Official Use Only Authorization >t hr: Safety z � fy p MCF 14. TOTAL VOLUME (ITEMS 6-12) 744,131 Lease Use MCF 15. NGL Gas Equivalent 0 Conservation MCF 16. Purchased gas 0 Waste: MCF 17. Transferred from: 0 f 18. Transferred to: (Express as a negative #) CGF -62,852,506 Commissioner Date 19. Remarks: I hereby certify that the foregoing is true and correct to the best of my knowledge. �� (///���" tI/nn-/t44nlf/1',,,' Note: All volumes must be corrected Signature l 1Nf IL, lei'-� Title Manager Production Taxes and Ro pities Alaska to pressure of 14.65 psis and t0 a &a temperature of 60o F. Authority 20 Printed Name Diane Colley Phone (907) 564-5775 Date V/11AAC25.235. VTL °f/trs/ls Form 10-422 Rev. 5/2009 INSTRUCTIONS ON REVERSE SIDE Submit in Duplicate BP EXPLORATION (ALASKA) INC. PRUDHOE BAY UNIT -GC -1 GAS FLARING INCIDENT REPORT April 2015 RECEIVED MAY 14 2015 Unplanned Events less than or equal to 1 hour TIME DATE TIME VOLUME DESCRIPTION OF INCIDENT & CAUSE ACTION TAKEN TO ELIMINATE CAUSE 4/4/2015 1400-1407 270 Not required for unplanned events <= 1 hr Not required for unplanned events <= 1 hr 4/7/2015 0935-0955 290 4/24/2015 1929-1938 980 4/24/2015 2303-2334 1,860 DATE TOTAL 3,400 uAI a TIME VOLUME DESCRIPTION OF INCIDENT & CAUSE ACTION TAKEN TO ELIMINATE CAUSE 4/22/2015 0745-0900 250 See attachments See attachments TOTAL 250 Planned Events Less Than or Equal 1 Hour AND <= 5,000 mcf DATE TIME VOLUME DESCRIPTION OF INCIDENT & CAUSE ACTION TAKEN TO ELIMINATE CAUSE 4/3/2015 0216-0230 670 See attachments See attachments 4/19/2015 1741-1748 280 TOTAL 950 Planned Events Exceeding 1 Hour OR > 5,000 mcf DATE TIME VOLUME DESCRIPTION OF INCIDENT & CAUSE ACTION TAKEN TO ELIMINATE CAUSE 4/15-16/2015 2130-0331 2,050 See attachments See attachments TOTAL 2,050 Unplanned Events < 1 Hour Unplanned Events > 1 Hour Planned Events < 1 hour and not exceeding 5,000 MCF Planned Events > 1 hour or exceeding 5,000 MCF Pilot Purge Assist TOTAL FLARED VOLUME TOTAL 3,400 250 950 2,050 54,675 0 61,325 Page 7 5/13/2015 1:24 PM Flare Start Date 04/01/2015 Flare End Date 04/30/2015 GC1 Flare Report Total Volume (MSCF) 6650 Report Numbs System Date StartTime Stop Time Duration Intermittent Black Smoke Planned Reported By Volume 15-92 Controlled Blowdown 04/03/2015 2:16:00 am 2:30.00 am 14 min No No Yes BPt\SPRINGG 670 Determination Cause Depressured D-86/87 through Test bank forfield work Action Taken Depressure done Daily Volume (MSCF) 670 Alli n— \ICA MAY 14 W5 AOGCC 15-110 Controlled Slowdown 04/15/2015 9:30:00 pm 11:59:00 pm 149 min No No Yes BP1\SHELTI 1860 Determination Cause Took Y/P LDF down for a pressure test and spin cooling K-7001 for a waterwash Action Taken Flaring will stop once work is finished Daily Volume (MSCF) 1860 15-111 Controlled Biowdown 04/16/2015 12:00:00 am 3:31:00 am 211 min No No Yes BP1\SHELT1 190 Determination Cause Spin cooled K-7001 for waterwash and performed waterwash Action Taken Stop when job is complete Daily Volume (MSCF) 190 15-114 Controlled Slowdown 04/19/2015 5:41:00 pm 5:48:00 pm 7 min No No Yes 131`7\SHELTI 280 Determination Cause Flare for K-3300 depressurs Action Taken stop when job is complete Daily Volume (MSCF) 280 15-117 Controlled Slowdown 04/22/2015 7:45:00 am 9:00:00 am 75 min Yes No No BP1u3PRINGG 250 Determination Cause Swapped GLT machines Action Taken done Daily Volume (MSCF) 250 Total Volume (MSCF) 6650 Generated 05/08/2015 4:16:54PM Page 8 of 10 Hunt, Jennifer L (DOA) From: AK, OPS PCC EOC TL <AKOPSPCCEOCTL@bp.com> Sent: Sunday, April 26, 2015 1:54 PM To: Hunt, Jennifer L (DOA) Cc: Loepp, Victoria T (DOA); Castano, Alejandra; Benson, Gary A; Arthur, Gregory; AK, HSSEE Env Adv West; AK, OPS GC3&PCC OSM; AK, OPS GCI Facility OTL; Borton, Kim; AK, OPS GCI OSM Subject: Flaring Event at GC1 To: Jennifer Hunt, AOGCC CC: Victoria Ferguson, AOGCC iennifer.hunt(o)alaska.aov victoria.ferguson aaalaska.aov From: Jennifer Blake, GPB Production Optimization Team Leader A flaring event occurred at GC1 starting at 04/15/2015 21:30 and stopping at 04/15/2015 23:59 with a volume of 1860 (MSCF). The event lasted for 149 minutes and was due a pressure test of Y/P LDF (Large Diameter Flowline) and spin cooling K-7001 for water wash. Flaring stopped when the pressure test and spin cool were completed. Please let me know if you have any questions. Thanks, Jennifer Blake PCC/EOC Production Optimization Team Lead Office (907) 659-4472 Cell (907) 830-6204 Jennifer.blake@bp.com Hunt, Jennifer L (DOA) From: AK, OPS PCC EOC TL <AKOPSPCCEOCTL@bp.com> Sent: Sunday, April 26, 2015 1:58 PM To: Hunt, Jennifer L (DOA) Cc: Loepp, Victoria T (DOA); Castano, Alejandra; Benson, Gary A; Arthur, Gregory; AK, HSSEE Env Adv West; AK, OPS GC3&PCC OSM; AK, OPS GC1 Facility OTL; Borton, Kim; AK, OPS GC1 OSM Subject: Flaring Event at GC1 To. Jennifer Hunt, AOGCC CC: Victoria Ferguson, AOGCC iennifer.hunt(a(<7alaska.gov victoria.ferguson(a)alaska.aov From: Jennifer Blake, GPB Production Optimization Team Leader A flaring event occurred at GC1 starting at 04/17/2015 00:00 and stopping at 04/17/2015 03:31 with a volume of 190 (MSCF). The event lasted for 211 minutes and was due to spin cooling K-7001 compressor for water wash. Flaring stopped when the spin cool was completed. Please let me know if you have any questions. Thanks, Jennifer Blake PCC/EOC Production Optimization Team Lead Office (907) 659-4472 Cell (907) 830-6204 Jennifer.blakePbp.com Hunt, Jennifer L (DOA) From: AK, OPS PCC EOC TL <AKOPSPCCEOCTL@bp.comn Sent: Sunday, April 26, 2015 2:01 PM To: Hunt, Jennifer L (DOA) Cc: Loepp, Victoria T (DOA); Castano, Alejandra; Benson, Gary A; Arthur, Gregory; AK, HSSEE Env Adv West; AK, OPS GC3&PCC OSM; AK, OPS GC1 Facility OTL; Borton, Kim; AK, OPS GC1 OSM Subject: Flaring Event at GC1 To: Jennifer Hunt, AOGCC CC: Victoria Ferguson, AOGCC jenniter.hunt( alaska.aov victoria.ferouson(aDalaska.aov From: Jennifer Blake, GPB Production Optimization Team Leader A flaring event occurred at GC1 starting at 04/22/2015 07:45 and stopping at 04/22/2015 09:00 with a volume of 250 (MSCF). The event lasted for 75 minutes and was due to swapping gas lift compressors. Flaring stopped when the swap was complete. Please let me know if you have any questions. Thanks, Jennifer Blake PCC/EOC Production Optimization Team Lead Office (907) 659-4472 Cell (907) 830-6204 Jennifer.blake@bp.com Hunt, Jennifer L (DOA) From: AK, OPS PCC EOC TL <AKOPSPCCEOCTL@bp.com> Sent: Sunday, April 26, 2015 2:16 PM To: Hunt, Jennifer L (DOA) Cc: Loepp, Victoria T (DOA); Castano, Alejandra; Benson, Gary A; Arthur, Gregory; AK, HSSEE Env Adv West; AK, OPS GC3&PCC OSM; AK, OPS GCl Facility OTL; Barton, Kim; AK, OPS GCl OSM Subject: Flaring Event at GCl To: Jennifer Hunt, AOGCC CC: Victoria Ferguson, AOGCC Jennifer huntCc alaska.aov victoria ferguson(c alaska.aov From: Jennifer Blake, GPB Production Optimization Team Leader Two flaring event occurred at GC1 on 04/17/2015: 1. Starting at 19:29 and stopping at 19:38 with a volume of 980 (MSCF). The event was a black smoke event and was due to a low pressure divert valve hanging open causing a high rate into C Slug Catcher sending it to flare. Flaring stopped when the divert valve was closed. 2. Starting at 23:03 and stopping at 23:34 with a volume of 1860 (MSCF). The event was a black smoke event and was due to a 30" rupture disk rupturing and relieving though a PSV. Flaring stopped when the PSV and rupture disk were swapped. Please let me know if you have any questions. Thanks, Jennifer Blake PCC/EOC Production Optimization Team Lead Office (907) 659-4472 Cell (907) 830-6204 Jennifer.blake@bp.com STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMMISSION FACILITY REPORT OF PRODUCED GAS DISPOSITION RECEIVED JUN 16 2015 AOGCC 1. Facility Number 0290000031 2. Facility Name PBU GC 1 3. Field PBU - WOA 4. Operator BP 5. MonlhNear of Disposition I May -2015 Disposition Volume MCF 20. For production from multiple pools, list contribution of each pool as a percent of Total Volume. 6. Sold 0 Pool Name Pool Code Percent 7. ReinjectedO PRUDHOE 640150 99.48E LISBURNE 640144 0.40% 8. Flared or vented 1 hour or less 2,270 MIDNIGHTSUN 640158 0.12% PT MCINTYRE 640180 0.00% 9. Flared or vented more than 1 hour (see instr.) 13,675 10. Pilot and Purge 56,711 11. Assist Gas 0 12. Fuel gas used in lease operations. 681,891 13. Other (see instructions) 0 Official Use Only Authorization >7 hr: Safety MCF 14. TOTAL VOLUME (ITEMS 6-12) 754,547 Lease Use MCF 15. NGL Gas Equivalent 0 Conservation MCF 16. Purchased gas 0 Waste: MCF 17. Transferred from: 0 1 / _ � -27- 0 ' l s Commissioner r�.,Date 18. Transferred to: (Express as a negative #) CGF -56,116,331 19. Remarks: I hereby certify that the foregoing is true and correct to the best of my knowledge. Note: All volumes must be corrected Signature Title Mana er Production Taxes and Ro hies Alaska to pressure Of 14.65 psis and t0 a temperature of 60o F. Authority 20 Printed Name Diane Colley Phone (907) 564-5775 Date 1,41141-45— , / / AAC25.235. VTL ;T175-11 6' Form 10-422 Rev. 512009 INSTRUCTIONS ON REVERSE SIDE Submit in Duplicate BP EXPLORATION (ALASKA) INC. PRUDHOE BAY UNIT - GC -1 GAS FLARING INCIDENT REPORT May 2015 RECEIVED JUN 16 2015 '� ®GGG Lnplanned Events less than or equal to 1 hour DATE TIME VOLUME DESCRIPTION OF INCIDENT & CAUSE ACTION TAKEN TO ELIMINATE CAUSE 5/1/2015 1540-1548 230 Not required for unplanned events <= 1 hr Not required for unplanned events <= 1 hr 5/2/2015 1606-1625 500 TOTAL 730 Page 9 5/1/2015 0134-0530 1,870 See attachments See attachments 5/19/2015 1016-1200 30 TOTAL 1,900 Planned Events Less Than or Equal 1 Hour AND <= 5,000 mcf DATE TIME VOLUME DESCRIPTION OF INCIDENT & CAUSE ACTION TAKEN TO ELIMINATE CAUSE 5/11/2015 2121-2129 300 See attachments See attachments 5/11/2015 2155-2159 130 5/18/2015 2116-2144 90 5/23/2015 2211-2216 320 5/24/2015 1145-1159 430 5/25/2015 0740-0754 230 5/27/2015 0702-0746 40 TOTAL 1,540 5/11/2015 5/16/2015 5/22/2015 5/27/2015 1358-1730 0510-2050 1020-1300 1243-1345 TOTAL 90 See attachments 10,735 810 140 11,775 See attachments 6/12/2015 10:03 AM BP EXPLORATION (ALASKA) INC. PRUDHOE BAY UNIT - GC -1 GAS FLARING INCIDENT REPORT May 2015 RECEIVE® JUN 16 2015 Page 10 6/12/2015 10:03 AM TOTAL Unplanned Events < 1 Hour 730 Unplanned Events> 1 Hour 1,900 Planned Events < 1 hour and not 1,540 exceeding 5,000 MCF Planned Events > 1 hour or 11,775 exceeding 5,000 MCF Pilot Purge 56,711 Assist 0 TOTAL FLARED VOLUME 72,656 RECEIVE® JUN 16 2015 Page 10 6/12/2015 10:03 AM OL JO g abed WV6E:ss:9 SLOZ/BO/90 Palwaua0 sneda»oJ eu!4oew 1l0 OOEE-)16uunsswjda0 asne3 uopeu!uueleO ME MHOS81AW8 saA ON ON ww9 wd00:91.:01. wd00:1.FO1. S1.0Z/£Z/SO la!lam meld 61,V91. Me (jOSVJ) awnloA Apeo paddems saul4oew auou ual!el uopoV saul4oew ll0 6wddems asneo uopeulwialad Me MHOSHIAW8 SBA ON ON ulw 091. wd 00:00:1. we OO:OZ:OL SLOZ/ZZ/90 Japan Bleld LI' 91. o£ (jOSW) own!oA RI!e0 alenbape swam slanal aouo paddols uaL(ei uopoy O/S 8 u! SIanal 4sllgels3 esnep uopewwjalap OE L1l3HS"de ON ON saA u!w 601. wdoo:oo:z1 we00'9L:01. SLOZ/61./90 Jallam aielj 941.-91. 06 (dOSW) awn!oA LIIeO ..--------.— .---_--- --- -- Buluum si jossaidwoo aouo 6uuelj dOjS uaMel uopoV LOOL->I papLjq esneo uopeu!wala0 06 U-13HS\Ld8 SBA ON ON up 9Z wd oo:bp:6 wd0091.:6 MZ/91,/90 JaRem meld 91,V91. 9ELOL (dOSW) awnIOA Rl!eO 'suop sem nedw aouo paddols 6uuelj ua>1e140I1ov 901. -II uo Heal leas nedam asneO uo!Ieu!wualaO 6 9£LM L1l3HS\Ld8 saA ON ON u!w 046 wd OO:OS:9 we9o:Ol:9 9LOZ/91./90 Jallam WSW CK -91. OZ9 (dOSW)awnIOA Apo pamssaidep Sem IDOL -)I ua4m paddols Buue!j ual!ei uopoy umopin4sjaye LOOL->lamssaidapol6uuelj esneouopeu!uuelso 0£1. mm11VNAld8 saA ON ON mwb wd 00:69:6 wd00:99:6 91.0Z/LUSO Japan afield BEL -91. pamssaadep sem OOE£-e ua4m paddols 6uuelj uaHei uopoV umopin4sjelJeooee->Iejnmidepol6uuelj esne0uo!leuiwjala0 WE HH11VVMd8 saA ON ON ww8 wd 00:6Z:6 wd OO:LZ:6 SLOZ/l1./90 Jallaa Suelj 9EL-91. '6umuw pue do sem OOZE -N ua4m paddols 6uuelj ua)!el uonoV ooze -N to eels pue e6md eta Buunp 6uueld asne0 uopeu!wielaO 06 N811V1M1.d8 saA ON SOA ww ZLZ wd 00-0e:S wd00:99:L 9LOZ/LL/9O la!lam Welj 9E1.-91. V V 0ov 510a 9I Nnr paz!Ilgels Salem uaHel u0140V 1!wp Al!peiado IOd SAE Jo PPS ww OLS 841 papaaoxa Sales se6 u94mJSAO"So 031/6UlPOO9JOj0MUo0luanwd of 6wuado amen well Shc Pale!l!ul walsRS uo9uanwd JOAO AueO941 esnepuopeu!wJalap OL91, 00NImdS\Id8 ON ON SOA ulw 9EZ we OO:Oc:9 we 0034E:L SLOZAO/SO lallam welj 9ZL-91. ewnloA Ag popodem pauueld aAowS Aoel8 lueA!uuelul uopeinp ewli dols swll lielS alep welsAS egwnN Idodea 91"M (dOSW) ewnloA leloi podab weld T:)9 9wz/1.E/90 BIRO pug aje!j SLOz/Lo/9O BIRO uelS eJe!j Flare Start Date 05/01/2015 Flare End Date 05/31/2015 Action Taken none planned event Daily Volume (MSCF) 320 15-152 Flare Relief 05/24/2015 11:45:00 am 11:59:00 am 14 min No No Yes BP1\KIRSCHW 430 Determination Cause depressure Cslugoatcher Action Taken none planned event Daily Volume (MSCF) 430 15-155 Controlled Blowdown 05/25/2015 7:40:00 am 7:54:00 am 14 min No No Yes Determination Cause Depressure G-43 through T -bank for Field OPS work Action Taken Depressured Daily Volume (MSCF) 230 15-159 Controlled Blowdown 05/27/2015 7:02:00 am 7:46:00 am 44 min No No Yes Determination Cause Depressured GA2 for wellpad OPS Action Taken Depressured 15-159 Controlled Blowdown 05/27/2015 12:43:00 pm 1:45:00 pm 62 min No No Yes Determination CaUSe Depressured G-47 for wellpad OPS Action Taken Depressured Daily Volume (MSCF) BPlZPRINGG 230 RECEIVED JUN 16 2015 A®GCC 131`1\SPRINGG 40 BP1\SPRINGG 140 180 Total Volume (MSCF) 15945 Generated 06/08/2015 8:53:39AM Page 9 of 10 STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMMISSION FACILITY REPORT OF PRODUCED GAS DISPOSITION 1. Facility Number 0290000031 2. Facility Name PBU GC 1 3. Field PBU - WOA 4. Operator I BP 5. MonthNear of Disposition June -2015 Disposition Volume MCF 20. For production from multiple pools, list contribution of each pool as a percent of Total Volume. 6. Sold D Pool Name Pool Code Percent 7. Reinjected 0 PRUDHOE 640150 98.65% LISBURNE 640144 1.19% 8. Flared or vented 1 hour or less 690 MIDNIGHT SUN 640158 0.16% PT MCINTYRE 640180 0.00% 9. Flared or vented more than 1 hour (see matt.) 3,930 10. Pilot and Purge 54,339 11. Assist Gas 0 12. Fuel gas used in lease operations. 580,088 13. Other (see instructions) 0 Official Use Only Authorization >t he Safety MCF 14. TOTAL VOLUME (ITEMS 6-12) 639,047 Lease Use MCF 15. NGL Gas Equivalent 0 Conservation MCF 16. Purchased gas 0 Waste: MCF 17. Transferred from: 0 `7 J 18. Transferred to: (Express as a negative #) CGF -54,139,752 Commissioner Date 19. Remarks: I hereby certify that the foregoing is true and correct to the best of my knowledge. Note: All volumes must be corrected Signature 63fyi iJ Title Mana er Production Taxes and Royalties Alaska to pressure Of 14.65 psis and to a temperature of 60o F. Authority 20 Printed Name Diane Colley Phone (907) 564-5775 Dale AAC25.235. Form 10-422 Rev. 5/2009 INSTRUCTIONS ON REVERSE SIDE Submit in Duplicate BP EXPLORATION (ALASKA) INC. PRUDHOE BAY UNIT - GC -1 GAS FLARING INCIDENT REPORT June 2015 Page 11 Unplanned Events less than or equal to 1 hour DATETIME VOLUME DESCRIPTION OF INCIDENT & CAUSE ACTION TAKEN TO ELIMINATE CAUSE 6/22/2015 0915-0927 120 Not required for unplanned events <= 1 hr Not required for unplanned events <= 1 hr 6/30/2015 2015-2026 270 TOTAL 390 Unplanned Events greater than 1 hour DATE TIME VOLUME DESCRIPTION OF INCIDENT & CAUSE ACTION TAKEN TO ELIMINATE CAUSE 6/5/2015 0730-1500 920 See attachments See attachments 6/13/2015 1023-2328 150 6/23/2015 1350-1625 180 6/24/2015 0908-1100 1,260 6/30/2015 1215-1327 660 TOTAL 3,170 Planned Events Less Than or Equal 1 Hour AND <= 5,000 mcf DATE TIME VOLUME DESCRIPTION OF INCIDENT & CAUSE ACTION TAKEN TO ELIMINATE CAUSE 6/2/2015 1037-1050 20 See attachments See attachments 6/26/2015 1530-1537 230 6/26/2015 1841-1853 50 TOTAL 300 6/21/2015 6/30/2015 1600-1840 1030-1300 TOTAL 80 See attachments 680 760 ACTION TAKEN TO ELIMINATE CAUSE See attachments 7/15/2015 3:53 PM BP EXPLORATION (ALASKA) INC. PRUDHOE BAY UNIT - GC -1 GAS FLARING INCIDENT REPORT June 2015 Page 12 7/15/2015 3 53 PM TOTAL Unplanned Events < 1 Hour 390 Unplanned Events> 1 Hour 3,170 Planned Events < 1 hour and not 300 exceeding 5,000 MCF Planned Events> 1 hour or 760 exceeding 5,000 MCF Pilot Purge 54,339 Assist 0 TOTAL FLARED VOLUME 58,959 Page 12 7/15/2015 3 53 PM Flare Start Date 06/01/2015 Flare End Date 06/30/2015 GC1 Flare Report Total Volume (MSCF) 4620 Report No Yes BPt\SPRINGG 50 Determination Cause Leak test was done on A-S/C. Vented Numbs System Date StartTime Stop Time Duration Intermittent Black Smoke Planned Reported By Volume 15-170 Flare Relief 06/02/2015 10:37:00 am 10:50:00 am 13 min No No Yes BP1\SPRINGG 20 Determination Cause Depressured Test bank to remove a dead leg No Yes BP1\SELFJR 680 Determination Cause TAKE G43 FLOWLINE DOWN USING TEST BANK FOR MAINT. Action Taken Depressure complete Action Taken DEPRESSURE G-43 FLOWLINE FOR MAINT FOR FIELDCREW .DEPRESSURE COMPLETE AND FLARE VALVE TO NORMAL -- - CLOSEI)P9SFFKW -------- Daily Volume (MSCF) 20 15-173 Flare Relief 06/05/2015 7:30:00 am 3:00:00 pm 450 min Yes No No BP1\SELFJR 920 Determination Cause fLARE OFF A -SLUG CATCHER FOR HEATER REPLACEMENTS Action Taken No response taken as this was deemed to be of short duration. Daily Volume (MSCF) 920 15-169 Flare Relief 06/13/2015 10:23:00 am 11:28:00 pm 785 min Yes No No BP1\SHELTI 150 Determination Cause While bringing production rates up D -bank 2nd stg. was flaring Action Taken Once rates were stable flaring stopped Daily Volume (MSCF) 150 15-199 Controlled Blowdown 06/21/2015 4:00:00 pm 6:40:00 pm 160 min No No Yes BPt\SPRINGG 80 Determination Cause Flared off Annex for GT21 job Action Taken Flaring done Daily Volume (MSCF) 80 Daily Volume (MSCF) 120 15-202 Controlled Blowdown 06/23/2015 1:50:00 pm 4:25:00 pm 155 min Yes No No 131`1\SPRINGG 180 Determination Cause Flared off ANNEX due togas plant losing some boosters Action Taken Flaring complete Daily Volume (MSCF) 180 15-206 Controlled Blowdown 06/24/2015 9:08:00 am 11:0000 am 112 min No No No SP1\SPRINGG 1260 Determination Cause Flared G-45 to Zero through test bank Action Taken done Daily Volume (MSCF) 1260 15-212 Controlled Blowdown 06/26/2015 3:30:00 pm 3:37:00 pm 7 min No No Yes BP1\SPRINGG 230 Determination Cause Swapped T bank; HP to LP Action Taken swap complete 15-212 Controlled Slowdown 06/26/2015 6:41:00 pm 6:53:00 pm 12 min No No Yes BPt\SPRINGG 50 Determination Cause Leak test was done on A-S/C. Vented Action Taken Vented complete Daily Volume (MSCF) 280 15-225 Controlled Slowdown 06/30/2015 10:30:00 am 1:00:00 pm 150 min Yes No Yes BP1\SELFJR 680 Determination Cause TAKE G43 FLOWLINE DOWN USING TEST BANK FOR MAINT. Action Taken DEPRESSURE G-43 FLOWLINE FOR MAINT FOR FIELDCREW .DEPRESSURE COMPLETE AND FLARE VALVE TO NORMAL -- - CLOSEI)P9SFFKW -------- 15-225 Controlled Slowdown 06/30/2015 12:15:00 pm 1:27:00 pm 72 min Yes No No BP1\SPRINGG 660 Determination Cause Pigging Y-LDF Generated 07/02/2015 3:52:31 PM Page 9 of 12 Flare Start Date 06/01/2015 Flare End Date 06/30/2015 Action Taken pigging done Total Volume (MSCF) 4620 Generated 07/02/2015 3:52:31 PM Page 10 of 12 Hunt, Jennifer L (DOA) From: AK, OPS PCC EOC TL <AKOPSPCCEOCTL@bp.com> Sent: Sunday, June 07, 2015 5:08 PM To: Hunt, Jennifer L (DOA) Cc: Loepp, Victoria T (DOA); Castano, Alejandra; Benson, Gary A; Arthur, Gregory; AK, HSSEE Env Adv West; AK, OPS GC3&PCC OSM; Barton, Kim; AK, OPS GC1 Facility OTL; AK, OPS GQ OSM Subject: Flaring Event a To: Jennifer Hunt, AOGCC CC: Victoria Ferguson, AOGCC iennifer.hunt(a alaska.gov victoria.ferguson(d,)alaska.gov From: David Spall, GPB Production Optimization Team Leader A flaring event occurred at GC1 starting at 06/05/2015 07:30 and stopping at 06/05/2015 15:00 with a volume of 920 (MSCF). The event lasted for 450 minutes and was due to Flare -off A -Slug catcher for heater replacements. The event stopped when production was moved to C -Slug Catcher. Thanks, Dave David Spall (Alternate —Jennifer Blake) PCC/EOC Production Optimization Team Lead 907-659-4472 Office 219-689-4036 Cell david.spa l l Caf bp.com Hunt, Jennifer L (DOA) From: AK, OPS PCC EOC TL <AKOPSPCCEOCTL@bp.com> Sent: Monday, lune 15, 2015 6:28 AM To: Hunt, Jennifer L (DOA) Cc: Loepp, Victoria T (DOA); Castano, Alejandra; Benson, Gary A; Arthur, Gregory; AK, OPS GC3&PCC OSM; Borton, Kim; AK, HSSEE Env Adv West; AK, OPS GC1 Facility OTL; AK, OPS GC1 OSM Subject: Correction Flaring Event amn Subject line was incorrect on the initial submission below. It should have stated Flaring event at GC1. I apologize for the mistake. Thank You Dave David Spall (Alternate—Jennifer Blake) PCC/EOC Production Optimization Team Lead 907-659-4472 Office 219-689-4036 Cell david.spall@bp.com From: AK, OPS PCC EOC TL Sent: Sunday, June 14, 2015 5:56 PM To: 'jennifer.hunt@alaska.gov' Cc: Loepp, Victoria T (DOA) (victoria.loepp(aaalaska.00v); Castano, Alejandra; Benson, Gary A; Arthur, Gregory; AK, OPS GC3&PCC OSM; Borton, Kim; AK, HSSEE Env Adv West; AK, OPS GC1 Facility OTL; AK, OPS GC1 OSM Subject: Flaring Event at GC3 To: Jennifer Hunt, AOGCC CC: Victoria Loepp, AOGCC iennifer hunt(o)alaska.00v Victoria. loeppCa alaska.aov From: David Spall, GPB Production Optimization Team Leader A flaring event occurred at GC1 starting at 06/13/2015 10:23 and stopping at 06/13/2015 23:28 with a volume of 150 (MSCF). The event lasted for 785 minutes and was due to flaring while bringing rates up on D -Bank 2m stage. The event stopped once rates were stable. Thanks Dave David Spall (Alternate —Jennifer Blake) PCC/EOC Production Optimization Team Lead 907-659-4472 Office 219-689-4036 Cell david.spall@bp.com Hunt, Jennifer L (DOA) From: AK, OPS PCC EOC TL <AKOPSPCCEOCTL@bp.com> Sent: Friday, June 26, 2015 8:37 AM To: Hunt, Jennifer L (DOA) Cc: Loepp, Victoria T (DOA); Castano, Alejandra; Benson, Gary A; Arthur, Gregory; AK, HSSEE Env Adv West; AK, OPS GC3&PCC OSM; Borton, Kim; AK, OPS GC1 Facility OTL; AK, OPS GC1 OSM Subject: Flaring Event a To: Jennifer Hunt, AOGCC CC: Victoria Ferguson, AOGCC a ennifer.hunt(a)alaska.00v victoria.ferouson(o)alaska.gov From: Jennifer Blake, GPB Production Optimization Team Leader A flaring event occurred at GC1 starting at 06/21/2015 16:00 and stopping at 06/21/2015 18:40 with a volume of 80 (MSCF). The event lasted for 160 minutes and was due to a Tandem Compressor Trip at CGF spiking transit line pressure at the GT21 derate location. The event stopped when production was cut to reduce pressure on GT21. A flaring event occurred at GC1 starting at 06/23/2015 13:50 and stopping at 06/23/2015 16:25 with a volume of 180 (MSCF). The event lasted for 155 minutes and was due a Tandem Compressor Trip at CGF spiking transit line pressure at the GT21 derate location. The event stopped when production was cut to reduce pressure on GT21. A flaring event occurred at GC1 starting at 06/24/2015 09:08 and stopping at 06/24/2015 11:00 with a volume of 1260 (MSCF). The event lasted for 112 minutes and was due to depressurizing G-45 to zero through test bank. The event stopped when depressurization was completed.. Thanks, Jennifer Blake PCC/EOC Production Optimization Team Lead (alt David Spall) Office (907) 659-4472 Cell (907) 830-6204 Jennifer.blake@bp.com Hunt, Jennifer L (DOA) From: AK, OPS PCC EOC TL <AKOPSPCCEOCTL@bp.com> Sent: Tuesday, June 30, 2015 12:12 PM To: Hunt, Jennifer L (DOA) Cc: Loepp, Victoria T (DOA); Castano, Alejandra; Benson, Gary A; Arthur, Gregory; AK, OPS GC3&PCC OSM; Martin, Nelson D; AK, HSSEE Env Adv East; AK, OPS FS1 Facility OTL; AK, OPS FSI OSM Subject: Flaring Event a To: Jennifer Hunt, AOGCC CC: Victoria Loepp, AOGCC iennifer.hunt(oalaska.aov Victoria loepp(@alaska.Qov From: Jennifer Blake, GPB Production Optimization Team Leader A flaring event occurred at FS1 starting at 06/29/2015 22:15 and stopping at 06/30/2015 with a volume of 3429 (MSCF). The event lasted for 105 minutes and was due to depressuring A and B gas trains and associated piping, including the 42" Residue Gas line to CCP, in preparation for TAR shutdown. The event will stop when depressurization is completed. A flaring event occurred at FS1 starting at 06/30/2015 00:01 and stopping at 06/30/2015 07:41 with a volume of 7882 (MSCF). The event lasted for 460 minutes. The event had a volume greater than 5000 (MSCF) and was due to continued depressurization of the 42" gas line from FS 1 to CCP in preparation for TAR shutdown. The event was stopped when depressurization was completed and the line was isolated. Thanks, Jennifer Blake PCC/EOC Production Optimization Team Lead (alt David Spall) Office (907) 659-4472 Cell (907) 830-6204 Jennifer.blake@bp.com Hunt, Jennifer L (DOA) From: AK, OPS PCC EOC TL <AKOPSPCCEOCTL@bp.com> Sent: Sunday, July 05, 2015 4:27 PM To: Hunt, Jennifer L (DOA) Cc: Loepp, Victoria T (DOA); Castano, Alejandra; Benson, Gary A; Arthur, Gregory; AK, OPS GC3&PCC OSM; Borton, Kim; AK, HSSEE Env Adv West; AK, OPS GC1 Facility OTL; AK, OPS GC1 OSM Subject: Flaring Event at To: Jennifer Hunt, AOGCC CC: Victoria Loepp, AOGCC Jennifer hunt(a)alaska.gov Victoria loepp(o alaska.gov From: David Spall, GPB Production Optimization Team Leader A flaring event occurred at GC1 starting at 06/30/2015 10:30 and stopping at 06/30/2015 13:00 with a volume of 680 (MSCF). The event lasted for 150 minutes and was due to De -pressuring G43 Flowline using test bank for maintenance. The event stopped when the depressurization was complete and Flare valve was to the normal closed position. A flaring event occurred at GC1 starting at 06/30/2015 12:15 and stopping at 06/30/2015 13:27 with a volume of 660 (MSCF). The event lasted for 72 minutes and was due to pigging Y -LCF. The event stopped when pigging was completed. A flaring event occurred at GC1 starting at 07/02/2015 16:43 and stopping at 07/02/2015 20:30 with a volume of 6670 (MSCF). The event lasted for 227 minutes. The event had a volume greater than 5000 (MSCF) The event was due to work in a cabinet in skid 404 causing a high level alarm and Plant Shutdown, The event Stopped when rate was brought back into the plant. A flaring event occurred at GC1 starting at 07/03/2015 08:00 and stopping at 07/03/2015 12:00 with a volume of 2400 (MSCF). The event lasted for 240 minutes. The event was due to work in 404 skid wiring caused ESD of Plant. The vent stopped when the problem was identified, stopped all work on wiring until TAR, and rate was brought back in to the plant and flaring stopped. Thanks David Spall (Alternate —Jennifer Blake) PCC/EOC Production Optimization Team Lead 907-659-4472 Office 219-689-4036 Cell david.spall@bp.com STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMMISSION FACILITY REPORT OF PRODUCED GAS DISPOSITION 1. Facility Number 0290000031 2. Facility Name PB GC 1 3. Field PBU - WOA 4. Operator BP 5. MonthNear of Disposition I July -2015 Disposition Volume MCF 20. Forproduction from multiple pools, list contribution of each pool as a percent of Total Volume. 6. Sold 0 Pool Name Pool Code Percent 7. Reinjected 0 PRUDHOE 640150 98.80% LISBURNE 640144 1.12% 8. Flared or vented 1 hour or less 0 MIDNIGHT SUN 640158 0.08% PTMCINTYRE 640180 0.00% 9. Flared or vented more than 1 hour (see instr.) 20,770 10. Pilot and Purge 57,512 11, Assist Gas 0 12. Fuel gas used in lease operations. 667,248 13. Other (see instructions) 0 Official Use Only Authorization>1 hr: Safety Z p �7-Q MCF 14. TOTAL VOLUME (ITEMS 6.12) 745,530 Lease Use MCF 15. NGL Gas Equivalent 0 Conservation MCF 16. Purchased gas 0 Waste: MCF 17. Transferred from: 0 -- 18. Transferred to: (Express as a negative#) CGF -64,290,989 Commissioner Date 19. Remarks: I hereby certify that foregoing is true and correct to the best of my knowledge. Note: All volumes must be corrected Signature fes'/ tC Title Mana er Production Taxes and Royalties Alaska to pressure of 14.65 psia and to a / "7 temperature of 60o F. Authority 20 Printed Name Diane ColleyPhone (907) 564-5775 Date / / : AAC25.235. VTC Form 10422 Rev. 5/2009 INSTRUCTIONS ON REVERSE SIDE Submit in Duplicate BP EXPLORATION (ALASKA) INC. PRUDHOE BAY UNIT - GC -1 GAS FLARING INCIDENT REPORT July 2015 Unplanned Events less than or equal to 1 hour DATE TIME VOLUME DESCRIPTION OF INCIDENT & CAUSE ACTION TAKEN TO ELIMINATE CAUSE Not required for unplanned events <= 1 hr Not required for unplanned events <= 1 hr Page 7 TOTAL 0 Unplanned Events greater than 1 hour DATE TIME VOLUME DESCRIPTION OF INCIDENT & CAUSE ACTION TAKEN TO ELIMINATE CAUSE 7/2/2015 1643-2030 6,670 See attachments See attachments 7/3/2015 0800-1200 2,400 7/30-31/2015 1830-2400 11,700 TOTAL 20,770 Planned Events Less Than or Equal 1 Hour AND <= 5,000 mcf DATE TIME VOLUME DESCRIPTION OF INCIDENT & CAUSE ACTION TAKEN TO ELIMINATE CAUSE See attachments See attachments TOTAL 0 Events Exceeding 1 Hour OR > See attachments TOTAL 0 TOTAL Unplanned Events < 1 Hour 0 Unplanned Events> 1 Hour 20,770 Planned Events < 1 hour and not 0 exceeding 5,000 MCF Planned Events > 1 hour or 0 exceeding 5,000 MCF Pilot Purge 57,512 Assist 0 TOTAL FLARED VOLUME 78,282 CAUSE See attachments 8/16/2015 5:37 PM Flare Start Date 07/01/2015 Flare End Date 07/31/2015 GC1 Flare Report Total Volume (MSCF) 20770 Report Numbe System Date Start Time Stop Time Duration Intermittent Black Smoke Planned Reported By Volume 15-229 Controlled Slowdown 07/02/2015 4:43.00 pm 8:30:00 pm 227 min Yes No No BP1\SELFJR 6670 Determination Cause SID 404 CVH2 HILL WORKING IN CABINET SID PLANT DUE TO TOUCHING WRONG WIRE SKIMTANK HI LEVEL SID Action Taken LOSS OF PRODUCTION RATE DYE TO PLANT SID /FLARE OFF GAS PLANT DUE TO LACK OF GAS RATE/ BRING IN RATE AND 15-231 Controlled Blowdown 07/03/2015 80000 am 12:00:00 pm 240 min No No No BP1\SELFJR 2400 Determination Cause S/DAND FLARING DUE TO WORK IN 404 SKID WIRING CAUSED ESD OF PLANT Action Taken FOUND PROBLEM AND STOP ALL WORK ON ON WIRING UNTIL STARTED TAR PLANT BACK UP AND STOPPED FLARING 15-250 Controlled Blowdown 07/30/2015 6:30:00 pm 12:00:00 am 330 min Yes No No BPI\SELFJR 1380 Determination Cause IP compressor shut down because of a problem associated with cutting rate for plant shutdown tar. Action Taken Plant rate is cut and ip gas comp is sId 15-251 Controlled Slowdown 07/31/2015 12:01.00 am 12:00:00 am 1439min Yes No No BP1\SELFJR 10320 Determination Cause Plant depressure for tat s/d Action Taken Plant depressure for tat s/d Total Volume (MSCF) 20770 Generated 08/04/2015 10:48:24AM Page 8 of 8 Hunt, Jennifer L (DOA) From: AK, OPS PCC EOC TL <AKOPSPCCEOCTL@bp.com> Sent: Sunday, July 05, 2015 4:27 PM To: Hunt, Jennifer L (DOA) Cc: Loepp, Victoria T (DOA); Castano, Alejandra; Benson, Gary A; Arthur, Gregory; AK, OPS GC3&PCC OSM; Borton, Kim; AK, HSSEE Env Adv West; AK, OPS GC1 Facility OTL; AK, OPS GCI OSM Subject: Flaring Event at GC1 To: Jennifer Hunt, AOGCC CC: Victoria Loepp, AOGCC aennifer.hunt( alaska.00v Victoria. loepp(o)alaska.gov From: David Spall, GPB Production Optimization Team Leader A flaring event occurred at GC1 starting at 06/30/2015 10:30 and stopping at 06/30/2015 13:00 with a volume of 680 (MSCF). The event lasted for 150 minutes and was due to De -pressuring G-43 Flowline using test bank for maintenance. The event stopped when the depressurization was complete and Flare valve was to the normal closed position. A flaring event occurred at GC1 starting at 06/30/2015 12:15 and stopping at 06/30/2015 13:27 with a volume of 660 (MSCF). The event lasted for 72 minutes and was due to pigging Y-LDF. The event stopped when pigging was completed. A flaring event occurred at GC1 starting at 07/02/2015 16:43 and stopping at 07/02/2015 20:30 with a volume of 6670 (MSCF). The event lasted for 227 minutes. The event had a volume greater than 5000 (MSCF) The event was due to work in a cabinet in skid 404 causing a high level alarm and Plant Shutdown, The event Stopped when rate was brought back into the plant. A flaring event occurred at GC1 starting at 07/03/2015 08:00 and stopping at 07/03/2015 12:00 with a volume of 2400 (MSCF). The event lasted for 240 minutes. The event was due to work in 404 skid wiring caused ESD of Plant. The vent stopped when the problem was identified, stopped all work on wiring until TAR, and rate was brought back in to the plant and flaring stopped. Thanks David Spall (Alternate —Jennifer Blake) PCC/EOC Production Optimization Team Lead 907-659-4472 Office 219-689-4036 Cell david.spalW)bo.com Hunt, Jennifer L (DOA) From: AK, OPS PCC EOC TL <AKOPSPCCEOCTL@bp.com> Sent: Sunday, August 09, 2015 12:28 PM To: Hunt, Jennifer L (DOA) Cc: Loepp, Victoria T (DOA); Castano, Alejandra; Benson, Gary A; Arthur, Gregory; AK, OPS GC3&PCC OSM; Borton, Kim; AK, HSSEE Env Adv West; AK, OPS GCI Facility OTL; AK, OPS GCI OSM Subject: Flaring Event at GC1 To: Jennifer Hunt, AOGCC CC: Victoria Loepp, AOGCC iennifer.hunt(aDalaska.cov Victoria. loepp(L alaska.gov From: David Spall, GPB Production Optimization Team Leader A flaring event occurred at GC1 starting at 07/30/2015 18:30 and stopping at 07/31/2015 with a volume of 1380 (MSCF). The event lasted for 330 minutes and was due to IP compressor shut down because of a problem associated with cutting rate for plant TAR shutdown. The event stopped when the Plant rate was cut and IP gas compressor was shutdown. A flaring event occurred at GC1 starting at 07/31/2015 00:01 and stopping at 08/01/2015 24:00 with a volume of 10320 (MSCF). The event lasted for 1439 minutes and was due Plant de -pressure for TAR shutdown. The event stopped when Plant de -pressure for TAR shutdown was completed. Thanks Dave David Spall (Alternate —Jennifer Blake) PCC/EOC Production Optimization Team Lead 907-659-4472 Office 219-689-4036 Cell david.spall@bp.com STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMMISSION FACILITY REPORT OF PRODUCED GAS DISPOSITION 1. Facility Number 0290000031 2. Facility Name PB GC 1 3. Field PBU - WOA 4. Operator BP 5. Month/Year of Disposition August -2015 Disposition Volume MCF 20. Forproduction from multiple pools, list contribution of each pool as a percent of Total Volume. 6. Sold 0 Pool Name Pool Code Percent 7. Reinjected 0 PRUDHOE 640150 97.73% LISBURNE 640144 2.19% 8. Flared or vented 1 hour or less 0 MIDNIGHTSUN 640158 0.08% PT MCINTVRE 640180 0.00% 9. Flared or vented more than 1 hour (see insir.) 5,353 10. Pilot and Purge 5,832 11. Assist Gas 0 12. Fuel gas used in lease operations. 43,024 13. Other (see instructions) 0 Official Use Only Authorization >7 hr: Safety MCF 14. TOTAL VOLUME (ITEMS 6-12) 54,209 Lease Use MCF 15. NGL Gas Equivalent 0 Conservation MCF 16. Purchased gas 0 Waste: MCF 17. Transferred from: 0 7_+v 18. Transferred to: (Express as a negative #) CGF -1,958,765 Commissioner Date 19. Remarks: I hereby certify that the foregoing is true and correct to the best of my knowledge. ad;ri///��,� pA,�%� Signature �'�C.ts"�V Title Mana er Production Taxes and Royalties Alaska Note: All volumes must be corrected to pressure Of 14.65 Asia and to a temperature of 60o F. Authority 20 AAC25.235. Printed Name Diane Colley Phone (907) 564-5775 Date / VTL- Form 10422 Rev. 5/2009 INSTRUCTIONS ON REVERSE SIDE Submit in Duplicate BP EXPLORATION (ALASKA( INC. PRUDHOE BAY UNIT- GC -1 GAS FLARING INCIDENT REPORT August 2015 Page 8 Unplanned Events less than or equal to 1 hour 1 DATE TIME VOLUME DESCRIPTION OF INCIDENT & CAUSE ACTION TAKEN TO ELIMINATE CAUSE Not required for unplanned events <= 1 hr Not required for unplanned events <= 1 hr TOTAL 0 DATE TIME VOLUME DESCRIPTION OF INCIDENT & CAUSE ACTION TAKEN TO ELIMINATE CAU5E 8/30-31/2015 1600-1001 5,353 See attachments See attachments TOTAL 5,353 Planned Events Less Than or Equal 1 Hour AND <= 5,000 mcf DATE TIME VOLUME DESCRIPTION OF INCIDENT & CAUSE ACTION TAKEN TO ELIMINATE CAUSE See attachments See attachments TOTAL 0 TOTAL Unplanned Events < 1 Hour Unplanned Events> 1 Hour Planned Events < 1 hour and not exceeding 5,000 MCF Planned Events > 1 hour or exceeding 5,000 MCF Pilot Purge Assist TOTAL FLARED VOLUME VOLUME DESCRIPTION OF INCIDENT See attachments 0 TOTAL 0 5,353 0 0 5,832 0 11,185 See attachments 9/11/2015 10:38 AM Flare Start Date 08/01/2015 Flare End Date 08/31/2015 Total Volume (MSCF) 5353 Generated 09/02/2015 9:47:02AM Page 8 of 10 GCI Flare Report Total Volume (MSCF) 5353 Report Numbs System Date Start Time Stop Time Duration Intermittent Black Smoke Planned Reported By Volume 15-289 Flare Relief 08/30/2015 4:00:00 pm 11:59:OOpm 479min No Yes No BPI\SHELTI 116 Determination Cause Plant start up, black smoke periodically. On LP flares 3 8 4. Action Taken Expect black smoke to stop once LP compressors are repaired and oil rate is much higher. Daily Volume (MSCF) 116 15-292 Flare Relief 08/31/2015 12:01:00 am 10:01:00 am 600 min No Yes No BPI\SHELTI 5237 Determination Cause Plant startup, black smoke periodically. On LP flares 384. Action Taken LP Compressor is running normal at 10:01 Daily Volume (MSCF) 5237 Total Volume (MSCF) 5353 Generated 09/02/2015 9:47:02AM Page 8 of 10 STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMMISSION FACILITY REPORT OF PRODUCED GAS DISPOSITION 1. Facility Number2. 0290000031 Facility Name PBU GC 1 3, Field PBU - WOA 4. Operator BP 5. Month/Year of Disposition Se tember-2015 Disposition Volume MCF 20. For production from multiple pools, list contribution of each pool as a percent of Total Volume. 6. Sold 0 Pool Name Pool Code Percent 7. Reinjected 0 PRUDHOE 640150 98.22% LISBURNE 640144 1.53 8. Flared or vented 1 hour or less 1,730 MIDNIGHT SUN 640158 0.25% PT MCINTYRE 640180 0.00% 9. Flared or vented more than 1 hour (see instr.) 1,200 10. Pilot and Purge 55,614 11. Assist Gas 0 12. Fuel gas used in lease operations. 589,166 13. Other (see instructions) 0 Of del Use Only Authorization >t he Safety /Z G O MCF 14. TOTAL VOLUME (ITEMS 6-12) 647,710 Lease Use MCF 15. NGL Gas Equivalent 0 Conservation MCF 16, Purchased gas 0 Waste: MCF 17. Transferred from: 0 18. Transferred to: (Express as a negative #) CGF -52,634,780 Commissioner Date 19. Remarks: I hereby certify that the foregoing is true and correct to the best of my knowledge. �/M�^ W Signature '/ K- Title Manager Production Taxes and Royalties Alaska Note: All volumes must be corrected to pressure of 14.65 psia and to a temperature of 60o F. Authority 20 AAC25.235. Printed Name Diane Colley Phone (907) 564-5775 Dalelbljvl,�- V'T L- /o12�ilrS Form 10-422 Rev. 5/2009 INSTRUCTIONS ON REVERSE SIDE Submit in Duplicate BP EXPLORATION (ALASKA) INC. PRUDHOE BAY UNIT - GC -1 GAS FLARING INCIDENT REPORT September 2015 9/6/2015 0340-0344 180 Not required for unplanned events <= 1 hr 9/24/2015 1800-1810 1,260 TOTAL 1,440 Not required for unplanned events <= 1 hr Page 7 9/2/2015 1720-2300 1,000 See attachments See attachments 9/30/2015 1645-2300 200 TOTAL 1,200 Planned Events Less Than or Equal 1 Hour AND <= 5,000 mcf DATE TIME VOLUME DESCRIPTION OF INCIDENT & CAUSE ACTION TAKEN TO ELIMINATE CAUSE 9/12/2015 1736-1742 30 See attachments See attachments 9/12/2015 2028-2315 260 TOTAL 290 TOTAL Unplanned Events < 1 Hour Unplanned Events > 1 Hour Planned Events < 1 hour and not exceeding 5,000 MCF Planned Events > 1 hour or exceeding 5,000 MCF Pilot Purge Assist TOTAL FLARED VOLUME G TOTAL 1,440 1,200 290 9 55,614 0 58,544 See attachments See attachments 10/15/2015 10:43 AM Flare StartDate 09/01/2015 Flare End Date 09/30/2015 GCI Flare Report Total Volume (MSCF) 2930 Report Numbe System Date Start Time Stop Time Duration Intermittent Black Smoke Planned Reported By Volume 15-296 Flare Relief 09/02/2015 5:20:00 pm 11:00:00 pm 340 min Yes No No BP1\FUELMO 1000 Determination Cause Pump station 1 SDV went closed causing production to be cut from GC -1. Low gas rate causing Flare valve to open off of V-136 Action Taken Pump station 1 SDV back open and rates brought back into the facility. Flaring off of V-136 stopped. Daily Volume (MSCF) 1000 15-306 Flare Relief 09/12/2015 5:36:00 pm 5:42:00 pm 6 min No Determination Cause 1-12o Wash K-7000 (spin w/ coppus) Action Taken wash done 15-306 Flare Relief 09/12/2015 8:28:00 pm 11:15:00 pm 167 min Yes Determination Cause Multiple K-7000 starts Action Taken done No No Yes BP1\SPRINGG 260 15-320 Flare Relief 09/30/2015 4:45:00 pm 11:00:00 pm 375 min No No Determination Cause Depressured E-44 for freeze protect Depressured F-47,48 for safe out. Action Taken flow lines are depressured Generated 10/02/2015 2:48:30PM Daily Volume (MSCF) 290 Daily Volume (MSCF) 200 Total Volume (MSCF) 2930 Page 6 of 8 STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMMISSION FACILITY REPORT OF PRODUCED GAS DISPOSITION 1. Facility Number 0290000031 2. Facility Name PBU GC 1 3. Field PBU - WOA 4. Operator BP 5. MonthNear of Disposition I October -2015 Disposition Volume MCF 20. For production from multiple pools, list contribution of each pool as a percent of Total Volume. 6. Sold 0 Pool Name Pool Code Percent 7. Reinjected O PRUDHOE 640150 98.767 LISBURNE 640144 0.98% 8. Flared or vented 1 hour or less 4,200 ' MIDNIGHTSUN 640158 0.26% PT MCINTYRE 640180 0.00% 9. Flared or vented more than 1 hour (see instr.) 1,550 10. Pilot and Purge 58,792 - 11. Assist Gas 0 - 12. Fuel gas used in lease operations. 743,382 13. Other (see instructions) 0 Official Use Only Authorization >1 hr: Safety �5-5D MCF 14. TOTAL VOLUME (ITEMS 6-12) 807,924 Lease Use MCF 15. NGL Gas Equivalent 0 Conservation MCF 16. Purchased gas 0 Waste: MCF 17. Transferred from: 0 . 18. Transferred to: (Express as a negative #) CGF -68,434,967 Commissioner Date 19. Remarks: I hereby certify that the foregoing is true and correct to the best of my knowledge. � Signature GCIf /l. Title Manager Production Taxes and R ote: All volumes must be corrected LOAN allies Alaska to pressure of 14.65 psis and to a {�L,./ temperature of 60o F. Authority 20 Printed Name Diane Colley Phone (907) 564-5775 Date 1/hi / jt I AAC25.235. V-TL- 2-) 151'5 - Form 10-422 Rev. 512009 INSTRUCTIONS ON REVERSE SIDE Submit in Duplicate BP EXPLORATION (ALASKA) INC. PRUDHOE BAY UNIT - GC -1 GAS FLARING INCIDENT REPORT October 2015 Unplanned Events less than or equal to 1 hour DATE TIME VOLUME DESCRIPTION OF INCIDENT & CAUSE ACTION TAKEN TO ELIMINATE CAUSE 10/17/2015 1351-1355 4,200 Not required for unplanned events <= 1 hr Not required for unplanned events <= 1 hr TOTAL 4,200 Unplanned Events greater than 1 hour DESCRIPTIONUAII; TIME VOLUME OF INCIDENT &CAUSE ACTION TAKEN TO ELIMINATE CAUSE See attachments See attachments TOTAL 0 Planned Events Less Than or Equal 1 Hour AND <= 5,000 mcf DATE TIME VOLUME DESCRIPTION OF INCIDENT & CAUSE ACTION TAKEN TO ELIMINATE CAUSE See attachments See attachments TOTAL 0 DATE 10/15/2015 0809-1004 TOTAL Unplanned Events <1 Hour Unplanned Events> 1 Hour Planned Events < 1 hour and not exceeding 5,000 MCF Planned Events > 1 hour or exceeding 5,000 MCF Pilot Purge Assist TOTAL FLARED VOLUME VOLUME DESCRIPTION OF I Ni 1,550 See attachments 1,550 TOTAL 4,200 0 0 1,550 55,792 0 64,542 ACTION TAKEN TO ELIMINATE CAUSE See attachments Page 9 11/16/2015 3:35 PM FlareStartDate 10/01/2015 Flare End Date 10/31/2015 GC1 Flare Report Total Volume (MSCF) 5750 Report Numbe System Date Start Time Stop Time Duration Intermittent Black Smoke Planned Reported By Volume 15-338 Flare Relief 10/15/2015 8:09:00am 10:04:00 am 115 min No Yes Yes BP1SPRINGG 1550 Determination Cause K-1058 K-108 down for sk-21 air dryer electrical tie-ins Action Taken tie-ins completed Daily Volume (MSCF) 1550 Total Volume (MSCF) 5750 Generated 11/06/2015 3:25:34PM Page 11 of 12 11/25/2015 RE: Flaring Event at GC1- Enterprise Vault Archived Item From AK, OPS PCC EOC TL Date 10/16/2015, 2:23:47 PM To AOGCC Reporting (DOA sponsored) Cc Loepp, Victoria T (DOA); Benson, Gary A; Arthur, Gregory; AK, OPS GC3&PCC OSM; Borton, Kim; AK, HSSEE Env Adv West; AK, OPS GCS Facility OTL; AK, OPS GC1OSM; Glover, Robin (SLR) Subject RE: Flaring Event at GC1 To: Jennifer Hunt, AOGCC CC: Victoria Loepp, AOGCC 0ennifer hunt &alaska.00v Victoria.loeimealaska.00v From: Jennifer Blake, GPB Production Optimization Team Leader My apologies for the resend, however the first report received an "undeliverable" notice from the AOGCC Reporting email recipient. A flaring event occurred at GC1 starting at 10/15/2015 08:09 and stopping at 10/15/2015 10:04 with a volume of 1550 (MSCF). The event was a black smoke event. The event lasted for 115 minutes and was due to K-105 and K-108 being down for Skid 21 air dryer electrical tie-ins. The event stopped when the tie-ins were completed. Thanks Jennifer Blake PCC/EOC Production Optimization Team Lead (alt David Spall) Office (907) 659-4472 Cell (907) 830-6204 Jennifer blake@bo.com haps J/amwo2.soa.alaska.gm/Enterpri seVauitMewM essage.asp?Vaultld=1870AD EC3E050i E4ABOD8874B7C F6EOBA1110000jnuwO2&Savesetld=20151118... 111 STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMMISSION FACILITY REPORT OF PRODUCED GAS DISPOSITION 1. Facility Number 0290000031 2. Facility Name PBU GC 1 3. Field PBU - WOA 4. Operator BP 5. MonthlYear of Disposition 1 November -2015 Disposition Volume MCF 20. Forproduction from multiple pools, list contribution of each pool as a percent of Total Volume. 6. Sold 0 Pool Name Pool Code Percent 7. Reinjected O PRUDHOE 640150 99.93°/ LISBURNE 640144 0.00% 8. Flared or vented 1 hour or lass 8,333 MIDNIGHT SUN 640158 0.07% PTMCINTYRE 640180 0.00% 9. Flared or vented more than 1 hour (see instr.) 4,520 10. Pilot and Purge 55,695 11, Assist Gas 0 12. Fuel gas used in lease operations. 729,391 13. Other (see instructions) 0 Official Use Only Authorization >7 hr: Safety 5333 MCF 14. TOTAL VOLUME (ITEMS 6-12) 797,939 Lease Use MCF 15. NGL Gas Equivalent 0 Conservation MCF 16. Purchased gas Waste: MCF 17. Transferred from: 0149—//. _! _, / le b Coissioner Date 18. Transferred to: (Express as a negative #) CGF -67,462,861 19. Remarks: I hereby certify that the foregoing is true and correct to the best of my knowledge. ®(�IyIA/l�n Note: All volumes must be corrected Signature (iGGUU�� �fC C ! Title Manager Production Taxes and Royalties Alaska to pressure of 14.65 psis and to a temperature of 60o F. Authority 20 Printed Name Diane Colley Phone (907) 564-5775 Date 14.1 / AAC25.235. Form 10-422 Rev. 512009 INSTRUCTIONS ON REVERSE SIDE Submit in Duplicate 11/18/2015 0500-0530 TOTAL BP EXPLORATION (ALASKA) INC. PRUDHOE BAY UNIT- GC -1 GAS FLARING INCIDENT REPORT November 2015 8,333 Not required for unplanned events <= 1 hr 8,333 Not required for unplanned events <= 1 hr 11/6/2015 1400-1521 50 See attachments See attachments 11/12/2015 1520-1720 4,470 TOTAL 4,520 Planned Events Less Than or Equal 1 Hour AND <= 5,000 mcf DATE TIME VOLUME DESCRIPTION OF INCIDENT & CAUSE ACTION TAKEN TO ELIMINATE CAUSE See attachments See attachments TOTAL 0 Planned Events Exceeding 1 Hour OR > 5,000 mcf DATE TIME VOLUME DESCRIPTION OF INCIDENT & CAUSE ACTION TAKEN TO ELIMINATE CAUSE See attachments See attachments TOTAL 0 Unplanned Events < 1 Hour Unplanned Events> 1 Hour Planned Events < 1 hour and not exceeding 5,000 MCF Planned Events> 1 hour or exceeding 5,000 MCF Pilot Purge Assist TOTAL FLARED VOLUME TOTAL 8,333 4,520 0 0 55,695 0 68,548 Page 6 12/15/2015 9:52 AM Flare StartDate 11/01/2015 Flare End Date 11/30/2015 GC1 Flare Report Total Volume (MSCF) 12853 Report Numbs System Date Start Time Stop Time Duration Intermittent Black Smoke Planned Reported By Volume 15-375 Flare Relief 11/06/2015 2:00:00 pm 3:21:00 pm 81 min No No No BP1\KIRSCHW 50 Determination Cause startup GLT3200 Action Taken started up offline GILT machine Daily Volume (MSCF) 50 15-380 Flare Relief 11/12/2015 3:20:00 pm 5:20:00 pm 120 min No No No BP1\BROWNK 4470 Determination Cause Flared off of V-136 due to Ethernet drop controller malfunction inPWX bringing in a stop production. Action Taken Geared stop production and brought gas rates back in Daily Volume (MSCF) 4470 Total Volume (MSCF) 12853 Generated 12/03/2015 4:18:41 PM Page 5 of 7 11/20/2015 Flaring Event at GC1 Flaring Event at GC1 AK, OPS PCC EOC TL [AKOPSPCCEOCTL@bp.com] Sent:Sunday, November 08, 2015 7:04 PM To: AOGCC Reporting (DOA sponsored) Cc: Loepp, Victoria T (DOA); Benson, Gary A [Gary.Benson@bp.com]; Arthur, Gregory [Gregory Arthur@bp.com]; AK, OPS GC3&PCC OSM [AKOPSGC3PCCOSM@BP.com]; Borton, Kim [Kim.Borton@bp.com]; AK, HSSEE Env Adv West [AKHSSEEEnvAdvWest@bp.com]; AK, OPS GC1 Facility OTL [AKOPSGC1FacilityOTL@bp.com]; AK, OPS GCI OSM [AKOPSGCIOSM@bp.com]; Glover, Robin (SLR) [Robin.Glover@bp.com] To: AOGCC Reporting CC: Victoria Loepp, AOGCC Aoccc.reportino Walaska.00v Victoria.loeop@alaska.gov From: Jennifer Blake, GPB Production Optimization Team Leader A flaring event occurred at GC1 starting at 11/06/2015 14:00 and stopping at 11/06/2015 15:21 with a volume of 50 (MSCF). The event lasted for 81 minutes and was due to startup of GILT Compressor 3200. The event stopped when startup was complete. Thanks Jennifer Blake PCC/EOC Production Optimization Team Lead (alt David Spall) Office (907) 659-4472 Cell (907) 830-6204 Jennifer.blake@bp.com haps://webmaila.alaska.gov/owa/?ae=Item&t=IPM.Note&id=RgAAAABKLne2zgP4SoM kep0hCxbSBwBUvQ964rjQTgYgn3632GdIAAAAhhLyAABUvQ964rjQT... 1/1 11/20/2015 Flaring Event at GC1 Flaring Event at GC1 AK, OPS PCC EOC TL [AKOPSPCCEOCTL@bp.com] Sent:Saturday, November 14, 2015 4:39 PM To: AOGCC Reporting (DOA sponsored) Cc: Loepp, Victoria T (DOA); Benson, Gary A [Gary.Benson@bp.com]; Arthur, Gregory [Gregory.Arthur@bp.com]; AK, OPS GC3&PCC OSM [AKOPSGC3PCCOSM@BP.com]; Borton, Kim [Kim.Borton@bp.com]; AK, HSSEE Env Adv West [AKHSSEEEnvAdvWest@bp.com]; AK, OPS GCI Facility OTL [AK0PSGC1Facility0TL@bp.com]; AK, OPS GC1 OSM [AKOPSGC10SM@bp.com]; Glover, Robin (SLR) [Robin.Glover@bp.com] To: AOGCC Reporting CC: Victoria Loepp, AOGCC Aoacc.reportino analaska.00v Victoda.loepp(aDalaska.gov From: Jennifer Blake, GPB Production Optimization Team Leader A flaring event occurred at GC1 starting at 11/12/2015 15:20 and stopping at 11/12/2015 17:20 with a volume of 4470 (MSCF). The event lasted for 120 minutes and was due to a controls issue in the Produced Water section of the plant resulting in a stop production and associated flaring. The event stopped when the stop production was cleared and the facility was brought back up. Thanks Jennifer Blake PCC/EOC Production Optimization Team Lead (alt David Spall) Office (907) 659-4472 Cell (907) 830-6204 Jennifer.blake@bp.com https://webmaila.alaska.gov/oval?ae=Item&t=IPM.Note&id=RgAAAABKLne2zgP4SoM kepGhCxl3SBwBUvQ964rjQTgYgn3632GdIAAAAhhLyAABUvQ9&kjQT... 1/1 11/30/2015 Flaring Event at GC1 Flaring Event at GCI AK, OPS PCC EOC TL [AKOPSPCCEOCTL@bp.com] Sent:Tuesday, November 24, 2015 3:59 PM To: AOGCC Reporting (DOA sponsored) Cc: Loepp, Victoria T (DOA); Benson, Gary A [Gary.Benson@bp.com]; Arthur, Gregory [Gregory.Arthur@bp.com]; AK, OPS GC3&PCC OSM [AKOPSGC3PCCOSM@BP.com]; Borton, Kim [Kim.Borton@bp.com]; AK, HSSEE Env Adv West [AKHSSEEEnvAdvWest@bp.com]; AK, OPS GCS Facility OTL [AK0PSGC1Fadlity0TL@bp.com]; AK, OPS GCI OSM [AKOPSGCIOSM@bp.com]; Glover, Robin (SLR) [Robin.Glover@bp.com] To: AOGCC Reporting CC: Victoria Loepp, AOGCC Aoacc.reoortingaa alaska.00v Victoria.loeooCa)alaska.gov From: David Spall, GPB Production Optimization Team Leader A flaring event occurred at GC1 starting at 11/18/2015 05:00 and stopping at 11/18/2015 05:30 with a volume of 8333 (MSCF). The event lasted for 30 minutes and was due to CGF lost tandem compressors. The event stopped when CGF brought tandem compressors back up, We choked back and SI wells to lower the Transit pressure.. Thanks David Spall (Alternate—Jennifer Blake) PCC/EOC Production Optimization Team Lead 907-659-4472 Office 219-689-4036 Cell david.soall@bo.com https://webm ai la.al aska.gov/owa/?ae=Item &t=1PM.N ote&id=RgAAAABKLne2zgP4SoM kepOhCxbSBwBUvQ964rjQTgYgn3632GdIAAAAhhLyAABU vQ964rj QT... 1/1 STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMMISSION FACILITY REPORT OF PRODUCED GAS DISPOSITION 1. Facility Number 0290000031 2. Facility Name PBU GC 1 3. Field PBU - WOA 4. Operator 8P 5. MonlhlYear of Disposition December -2015 Disposition Volume MCF 20. For production Imm multiple pools, list contribution of each pool as a percent of Total Volume - 6. s. sold Pool Name Pool Code Percent 7. Reinjected0 PRUDHOE 640150 99.95% LISBURNE 640144 0.00% 8. Flared or vented 1 hour or less 183 MIDNIGHTSUN 640158 0.05% PT MCINTYRE 640180 0.00% 9. Flared or vented more than 1 hour (see inslr.) 4,845 10. Pilot and Purge 57,519 11. Assist Gas 0 12. Fuel gas used in lease operations. 803,125 13. Other (see instructions) Q Oficial Use Only Authorization >t hr: Safety Q �U ¢5 MCF 14. TOTAL VOLUME (ITEMS 6-12) 865,672 Lease Use MCF 15. NGL Gas Equivalent Q Conservation MCF 16. Purchased gas Q Waste: MCF 17. Transferred from 0 18. Transferred to: (Express as a negative #) CGF -70,371,880 Coehmissioner Date 19. Remarks: I hereby certify that the foregoing is we and correct to the best of my know ge. Note: All volumes must be corrected Signatur _ Title Mana er Production Taxes and Rovaltres Alaska I to pressure of 14.65 Asia and to a v I temperature of 600 F. Authority 20 Printed Name Diane Colley Phone (907) 5645775 Date I 6 { �j AAC25.235. VT L Form 10422 Rev. 512009 INSTRUCTIONS ON REVERSE SIDE Submit in Duplicate BP EXPLORATION (ALASKA) INC. PRUDHOE BAY UNIT - GC -1 GAS FLARING INCIDENT REPORT December 2015 Unplanned Events less than or equal to 1 hour DATE TIME VOLUME DESCRIPTION OF INCIDENT & CAUSE ACTION TAKEN TO ELIMINATE CAUSE 12/6/2015 1417-1421 3 Not required for unplanned events <= 1 hr Not required for unplanned events <= 1 hr 12/6/2015 2012-2046 14 12/11/2015 1221-1226 34 TOTAL 51 Page 1 Unplanned Events greater than 1 hour DATE TIME VOLUME DESCRIPTION OF INCIDENT & CAUSE ACTION TAKEN TO ELIMINATE CAUSE 12/6/2015 1817-2350 370 See attachments See attachments 12/7/2015 0002-0633 490 12/7/2015 0025-0149 63 12/8/2015 1649-2352 140 12/9-10/2015 0000-2400 1,597 12/11/2015 0018-1218 1,990 12/13/2015 0000-2400 195 TOTAL 4,845 Planned Events Less Than or Equal 1 Hour AND <= 5,000 mcf DATE TIME VOLUME DESCRIPTION OF INCIDENT & CAUSE ACTION TAKEN TO ELIMINATE CAUSE 12/15/2015 1300-1315 99 See attachments See attachments 12/15/2015 2110-2117 33 TOTAL 132 TOTAL N See attachments See attachments 1/28/2016 220 PM BP EXPLORATION (ALASKA) INC. PRUDHOE BAY UNIT -GC -1 GAS FLARING INCIDENT REPORT December 2015 Page 2 1/28/2016 2:20 PM TOTAL Unplanned Events < 1 Hour 51 Unplanned Events> 1 Hour 41845 Planned Events < 1 hour and not 132 exceeding 5,000 MCF Planned Events> 1 hour or 0 exceeding 5,000 MCF Pilot Purge 57,519 Assist 0 TOTAL FLARED VOLUME 62,547 Page 2 1/28/2016 2:20 PM FlareStartDate 12/01/2015 Flare End Date 12/31/2015 GC1 Flare Report Total Volume (MSCF) 5028 Report Numbs System Date Start Time Stop Time Duration Intermittent Black Smoke Planned Reported By Volume 15-397 Flare Relief 12/06/2015 6:17:00 pm 11:50:00 pm 333 min Yes No No BP1 VONESCC 370 Determination Cause V-136 Flare Valve PIC -0402 Open due to swings in the production rates from Annex into D -Bank. EST -9912B flow limited due to fouling. Action Taken Lowered TEG circulation rate from 92 gpm to 85 gpm 15-398 Flare Relief 12/07/2015 12:02:00 am 6:33:00 am 391 min Yes No No 8PIUONESCC 490 Determination Cause V-136 Flare Valve PIC -0402 Open due to swings in the production rates from Annex into D -Bank. EST -9912B flow limited due to fouling. Action Taken Lowered Annex TEG circulation rate from 92 gpm to 85 gpm to stabilize swings through reboiler. 15-398 Flare Relief 12/07/2015 1225:00 am 1:49:00 am 84 min Yes No No BPI\LOTTTO 63 Determination Cause LP gas rate to Gas Plant swinging due to upset Annex Reboiler from Well/Flowline unloading. Action Taken Well/Flowline unleaded. 15-399 Flare Relief 12/08/2015 4:49:00 pm 11:52:00 pm 423 min Yes No No BP1\JONESCC 140 Determination Cause V-136 Flare Valve PIC -0402 Open 0.14 hour (intermittent open over 423 minute expanse of time)- Unknown cause. Action Taken No trending cause detected to remedy 15400 Flare Relief 12/09/2015 12:00:00 am 12:00:00 am 1440 min Yes No Determination Cause V-136 Flare Valve PIC -0402 Open due to swings in the IP suction pressure. Action Taken No problem found. 15-404 Flare Relief 12/10/2015 12:00:00 am 12:00:00 am 1440 min Yes No Determination Cause V-136 Flare Valve PIC -0402 Open due to swings in IP suction pressure. Action Taken No problem diagnosed. 15-406 Flare Relief 12/11/2015 12:18:00 am 12:18:00 pm 720 min Yes No Determination Cause V-136 Flare Valve PIC -0402 Open due to K-108 anti -surge FV -431 failure. Action Taken Swapped IP Compressors to work on FV -431. No BP1\SPRINGG 442 No BP7\SPRINGG 1155 No BPWONESCC 1990 15-407 Flare Relief 12/13/2015 12:00:00 am 12:00:00 am 1440 min Yes No No BP1\SPRINGG 195 Determination Cause V-136 Flare Valve PIC -0402 Open due the LP 81P compressor designs are no longer adequate for current process conditions. Generated 01/08/2016 11:15:02AM Page 5 of 7 Flare Start Date 12/01/2015 Flare End Date 12/31/2015 Action Taken Swapped IP Compressors to work on FV -4311. 15409 Controlled Slowdown 12/15/2015 1:00:00 pm 1:15:00 pm 15 min No No Yes BPIISPRINGG Determination Cause S/D GLT3200 after issue with little alica resolved Action Taken NO response taken as this was deemed to be of start duration. 15409 Controlled Slowdown 12/15/2015 9:10:00 pm 9:17:00 pm 7 min No No Yes BPI\SPRINGG Determination Cause Depressured G45 through T -bank to freeze protect for F rank Action Taken No response taken as this was deemed to be of short duration. 99 33 Total Volume (MSCF) 5028 Generated 01/08/2016 11:15:02AM Page 6 of 7 12/14/2015 Flaring Event at GC1 Flaring Event at GC1 AK, OPS PCC EOC TL [AK0PSPCCE0CTL@bp.00M1 sent:Sunday, December 13, 2015 1:04 PM To: AOGCC Reporting (DOA sponsored) Cc: Loepp, Victoria T (DOA); Benson, Gary A [Gary.Benson@bp.com]; Arthur, Gregory [Gregory.Arthur@bp.com]; AK, OPS GC3&PCC OSM [AKOPSGC3PCCOSM@BP.com]; Barton, Kim [Kim.Borton@bp.com]; AK, HSSEE Env Adv West [AKHSSEEEnvAdvWest@bp.com]; AK, OPS GC1 Facility OTL (AKOPSGC1FacilityOTL@bp.com]; AK, OPS GCI OSM [AKOPSGCIOSM@bp.com]; Glover, Robin (SLR) [Robin.Glover@bp.com]; Kain, Rachel B [Rachel.Kain@bp.com] To: AOGCC Reporting CC: Victoria Loepp, AOGCC Aoacc reoorting@alaska gov Victoria Ioeoo(d)alaska.gov From: Jennifer Blake, GPB Production Optimization Team Leader A flaring event occurred at GC1 starting at 12/06/2015 18:17 and stopping at 12/06/2015 23:50 with a volume of 370 (MSCF). The event was intermittent over the duration of 333 minutes and was due to swings in the production rates from the Annex into D Bank bumping the flow limit of the heat exchanger. The event stopped when the TEG circulation rate was lowered. The flare was only open for 0.37 hours over the duration of the flaring event. A flaring event occurred at GCI starting at 12/07/2015 00:02 and stopping at 12/07/2015 06:33 with a volume of 490 (MSCF). The event was intermittent over the duration of 391 minutes and was due to swings in the production rates from the Annex into D Bank bumping the flow limit of the heat exchanger. The event stopped when the TEG circulation rate was lowered. The flare was only open for 0.49 hours over the duration of the flaring event. A flaring event occurred at GC1 starting at 12/08/2015 16:49 and stopping at 12/08/2015 23:52 with a volume of 140 (MSCF). The event was intermittent over the duration of 423 minutes and was due to an unknown cause. The flaring event self -corrected and the valve to the flare was only open for 0.14 hours over the duration of the flaring event. A flaring event occurred at GC1 starting at 12/09/2015 00:00 and stopping at 12/10/2015 with a volume of 442 (MSCF). The event was intermittent over the duration of 1440 minutes and was due to V-136 flare valve opening due to swings in the IP suction pressure. No problem was found causing the IP suction pressure swing. The valve to flare was only open for 1.18 hours over the duration of the flaring event A flaring event occurred at GC1 starting at 12/10/2015 00:00 and stopping at 12/11/2015 with a volume of 1155 (MSCF). The event was intermittent over the duration of 1440 minutes and was due to V-136 flare valve opening due to swings in the IP suction pressure. No problem was found causing the IP suction pressure swing. The valve to flare was only open for 3.08 hours over the duration of the flaring event. A flaring event occurred at GC1 starting at 12/11/2015 00:18 and stopping at 12/11/2015 12:18 with a volume of 1990 (MSCF). The event lasted for 720 minutes and was due to V-136 flare valve opening as a result of the K-108 compressor anti surge valve failure. The event stopped when the IP Compressors were swapped to work on the anti -surge valve. The flare was only open for 1.99 hours over the duration of the flaring event. Work orders were written to determine and fix the cause of the unknown flare events. Thanks, Jennifer Blake PCC/EOC Production Optimization Team Lead (alt David Spall) Office (907) 659-4472 Cell (907) 830-6204 Jennifer.blake@bp.com https:llwebmai la.alaska.gavlowal?ae=Item &t=IPM.N ote&id=RgAAAABKLne2zgP4SoM kepOhCxbSBwBUvQ964rjQTgygn3632GdIAAAAhhLyAABUvQ964rjQT... 1/2 12/30/2015 Flaring Event at GC1 Flaring Event at GC1 AK, OPS PCC EOC TL [AKOPSPCCEOCTL@bp.COM1 Sent:Friday, December 18, 2015 3:27 PM To: AOGCC Reporting (DOA sponsored) SIo]n,vv@bp.com]; AK, OPS GC3&PCC OM [AKOPSGC3PCCOSM@BP.com; BortoKim [Kim.Borton@bp.com], AK, HSSEE EnAdv [AKHSSEEEnvAdvWest@bp.com]; AK, OPS GC1 Facility OTL [AKOPSGC1FacilityOTL@bp.com]; AK, OPS GC1 OSM [AKOPSGC10SM@bp.com]; Glover, Robin (SLR) [Robin.Glover@bp.com]; Kain, Rachel B [Rachel.Kain@bp.com] To: AOGCC Reporting CC: Victoria Loepp, AOGCC Aoocc reporting@alaska Qov Victoria IoeppCc)alaska.gov From: Jennifer Blake, GPB Production Optimization Team Leader A flaring event occurred at GC1 starting at 12/13/2015 00:00 and stopping at 12/14/2015 with a volume of 195 (MSCF). The event lasted for 1440 minutes. The event was intermittent over the duration of 1440 minutes. The flaring event was caused by the V-136 Flare Valve opening intermittently due to process conditions. The flare valve was only open for 0.52 hours over the duration of the flaring event. The event stopped when the IP compressors were swapped. This flaring event is related to the flaring events earlier in the week. Work orders were written to determine and fix the cause of the unknown flare events. Thanks, Jennifer Blake PCC/ECC Production Optimization Team Lead (alt David Spall) Office (907) 659-4472 Cell (907) 830-6204 Jennifer.blake@bp.com https:l/webmaila.alaska.gov/awa/?ae=ltem &t= IPM.Note&id= RgAAAABKLne2zgP4SoM kepOhC xbSBwBUvQ964rjQTgygn3632GdIAAAAhhLyAABUvQ964rjQT... 1/1 STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMMISSION FACILITY REPORT OF PRODUCED GAS DISPOSITION 1. Facility Number 0290000031 2. Facility Name PBU GC 1 3. Field PBU - WOA 4. Operator BP 5. MonthNear of Disposition I December -2015 Disposition Volume MCF 20. Forproduction from multiple pools, list contribution or each pool as a percent of Total Volume. 6. Sold 0 Pool Name Pool Code Percent 7. Reinjected 0 PRUDHOE 640150 99.95% LISBURNE 640144 0.00% 8. Flared or vented 1 hour or less dwil 51IFUS oft Ili MIDNIGHTSUN 640158 0.05% s. :. PT MCINTYRE 640180 0.00% 9. -17 Flared or vented more than 1 hour (see insh.) 10. Pilot and Purge 57,519 11. Assist Gas 0 12. Fuel gas used in lease operations. 803,125 13. Other (see instructions) 0 Official Use Only Authorization >t hr: Safety MCF 14. TOTAL VOLUME (ITEMS 6-12) 865,672 Lease Use MCF 15. NGL Gas Equivalent 0 Conservation MCF 16. Purchased gas 0 Waste: MCF 17. Transferred from: 0 18. Transferred to: (Express as a negative #) CGF -70,371,880 Commissioner Date 19. Remarks: I hereby certify the a foregoing is true and correct to the best of my knowledge. J' Signature VOW 11 i Title Mana er Production Taxes and Ro alties Alaska Note: All volumes must be corrected to pressure of 14.65 psia and to a temperature of 60o F. Authority 20 AAC25.235. Printed Name Diane Colley Phone (907) 564-5775 Date 111,J6 Form 10-422 Rev. 512009 INSTRUCTIONS ON REVERSE SIDE Submit in Duplicate DATE TIME 12/6/2015 1417-1421 12/6/2015 2012-2046 12/11/2015 1221-1226 TOTAL DATE TIME 12/6/2015 1817-2350 12/7/2015 0002-0633 12/7/2015 0025-0149 12/8/2015 1649-2352 12/9-10/2015 0000-2400 12/11/2015 0018-1218 12/13/2015 0000-2400 TOTAL or BP EXPLORATION (ALASKA) INC. PRUDHOE BAY UNIT - GC -1 GAS FLARING INCIDENT REPORT December 2015 3 Not required for unplanned events <= 1 hr 14 34 51 370 See attachments 490 63 140 1,597 1,990 195 4,845 1 Hour AND <= 5,000 VOLUME DE See attachments TOTAL 0 12/15/2015 1300-1315 99 See attachments 12/15/2015 2110-2117 33 TOTAL 132 ACTION TAKEN TO ELIMINATE CAUSE Not required for unplanned events <= 1 hr See attachments See attachments ACTION TAKEN TO ELIMINATE CAUSE See attachments Page 6 1/14/2016 4:19 PM BP EXPLORATION (ALASKA) INC. PRUDHOE BAY UNIT -GC -1 GAS FLARING INCIDENT REPORT December 2015 TOTAL Unplanned Events < 1 Hour 51 Unplanned Events> 1 Hour 4,845 Planned Events < 1 hour and not 0 exceeding 5,000 MCF Planned Events > 1 hour or 132 exceeding 5,000 MCF l% A A 1 Pilot Purge 57,519R S E Assist 0 TOTAL FLARED VOLUME 62,547 Page 7 1/14/2016 4:19 PM