Department of Commerce, Community, and Economic Development
Alaska Oil and Gas Conservation Commission
Loading...
HomeMy WebLinkAboutPBU GC 1 - BP Exploration (Alaska) Inc.State of Alaska AOGCC
Gas Disposition Files
Year: 2015
Facility: PBU GC 1
Operator: BP EXPLORATION (ALASKA) INC.
STATE OF ALASKA
ALASKA OIL AND GAS CONSERVATION COMMISSION
FACILITY REPORT OF PRODUCED GAS DISPOSITION
RECEIVED
FEB 19 2015
AOGCC
1. Facility Number
0290000031
2. Facility Name
PBU GC 1
3. Field
PBU - WOA
4. Operator
BP
5. Month/Year of Disposition
January -2015
Disposition
Volume MCF
20. Forproduction from multiple pools, list contribution of each pool as a percent of
Total Volume.
6. Sold
p
Pool Name Pool Code Percent
7. Reinjected
O
PRUDHOE 640150 99.37%
LISBURNE 640144 0.33%
8. Flared or vented 1 hour or less
O
MIDNIGHTSUN 640158 0.30%
PT MCINTYRE 640180 0.00%
9. Flared or vented more than 1 hour (see instr.)
2,230
10. Pilot and Purge
56,913
11. Assist Gas
0
12. Fuel gas used in lease operations.
778,467
13. Other (see iinstructions)Official
Use Only
Authorization > 7 hr:
Safety
2 Z 3 p
MCF
14. TOTAL VOLUME (ITEMS 6-12)
837,610
Lease Use
MCF
15. NGL Gas Equivalent
0
Conservation
MCF
16. Purchased gas
Waste:
MCF
17. Transferred from:
U
Yom-- 3-2-3-15-
Commissioner Date
18. Transferred to: (Express as a negative #) CGF
-57,839,582
19. Remarks:
I hereby certify that the foregoing is true and correct to the best of my knowledge.
/ J/ i) Note: All volumes must be corrected
Signature a 'f /M� .f/ Title Manager Production Taxes and R alties Alaska to pressure of 14.65 psi8 and to a
temperature of 60o F. Authority 20
Printed Name Diane Colle Phone (907) 564-5775 Date / AAC25.235.
I/ rl-
3/f9/fS
Form 10-422 Rev. 5/2009 INSTRUCTIONS ON REVERSE SIDE Submit in Duplicate
BP EXPLORATION (ALASKA) INC. RECEIVED
PRUDHOE BAY UNIT -GC -1 FEB 1 9 2015
GAS FLARING INCIDENT REPORT
January 2015
Unplanned Events less than or equal to 1 hour
DATE TIME VOLUME DESCRIPTION OF INCIDENT & CAUSE ACTION TAKEN TO ELIMINATE CAUSE
Not required for unplanned events <= 1 hr Not required for unplanned events <= 1 hr
TOTAL
0
Unplanned Events greater than 1 hour
DATE TIME VOLUME DESCRIPTION OF INCIDENT & CAUSE ACTION TAKEN TO ELIMINATE CAUSE
1/5/2015 1235-1950 1,750 See attachments See attachments
1/6/2015 0250-0950 480
TOTAL 2,230
Planned Events Less Than or Equal 1 Hour AND <= 5,000 mcf
DATE TIME VOLUME DESCRIPTION OF INCIDENT & CAUSE ACTION TAKEN TO ELIMINATE CAUSE
See attachments See attachments
TOTAL 0
Planned Events Exceeding 1 Hour OR> 5,000 mcf
JAIL TIME
VOLUME DESCRIPTION OF IN
See attachments
TOTAL
0
TOTAL
Unplanned Events < 1 Hour
0
Unplanned Events > 1 Hour
2,230
Planned Events < 1 hour and not
0
exceeding 5,000 MCF
Planned Events > 1 hour or
0
exceeding 5,000 MCF
Pilot Purge
56,913
Assist
0
TOTAL FLARED VOLUME
59,143
ACTION TAKEN TO ELIMINATE CAUSE
See attachments
Page 7
2/12/2015
10:37 AM
Flare StartDate 01/01/2015 RECEIVED
Flare End Date 01/31/2015
GCI Flare Report FEB 19 2015
Total Volume (MSCF) 2230
Report AOUCC
Numbs System Date StartTime Stop Time Duration Intermittent Black Smoke Planned Reported By Volume
15-5 Controlled Slowdown 01/05/2015 12:35:00 pm 7:50:00 pm 435 min Yes
Determination Cause S/D K7000, lost disch. cooler fan causing high temp. severat starts
Action Taken up@ 1950
15-7 Controlled Blowdown 01/06/2015 2:50:00 am 9:50:00 am 420 min Yes
Determination Cause C -Bank 1st stg. PIC flare controller leaking by
Action Taken Inst. techs repaired
Generated 02/03/2015 8:58'.00AM
No No BPIVSPRINGG 1750
. _......-....._....._...
Daily Volume (MSCF) 1750
No No BP14SPRINGG 480
Daily Volume (MSCF) 480
Total Volume (MSCF) 2230
Page 5 Of 6
Hunt, Jennifer L (DOA)
From: AK, OPS PCC EOC TL <AKOPSPCCEOCTL@bp.com>
Sent: Saturday, January 10, 2015 12:48 PM
To: Hunt, Jennifer L (DOA)
Cc: Loepp, Victoria T (DOA); Roby, David S (DOA); Castano, Alejandra; Benson, Gary A;
Arthur, Gregory; AK, HSSEE Env Adv West; Hauger, Wayne A; AK, OPS GC3&PCC OSM;
AK, OPS PCC EOC TL; AK, OPS GC1 Facility OTL; AK, OPS GC1 OSM
Subject: Flaring Events at_
To: Jennifer Hunt, AOGCC CC: Dave Roby, AOGCC CC: Victoria Ferguson,
AOGCC
iennifer.hunt()aalaska.gov dave.robv(rDalaska.aov victoria.ferctuson(rDalaska.o
ov
From: Wendy Hiester, GPB Production Optimization Team Leader
A flaring event occurred at GCI starting at 01/06/2015 02:50 and stopping at 01/06/2015 09:50 with a volume
of 480 (MSCF). The event lasted for 420 minutes and occurred when the C -Bank 1 st stage PIC flare controller
leaked by. Flaring stopped when the repair was completed by the instrument techs.
A flaring event occurred at GCI starting at 01/05/2015 12:35 and stopping at 01/05/2015 19:50 with a volume
of 1750 (MSCF). The event lasted for 435 minutes and occurred when the K7000 shut down on high
temperature following loss of discharge cooler fan. Flaring stopped when the compressor was successfully
restarted.
A flaring event occurred at GC1 starting at 12/15/2014 16:04 and stopping at 12/15/2014 17:48 with a volume
of 1990 (MSCF). The event lasted for 104 minutes and occurred due to a bad PIC card on the K-7001
compressor. Flaring stopped when the repair was completed by the turbo techs.
STATE OF ALASKA
ALASKA OIL AND GAS CONSERVATION COMMISSION
FACILITY REPORT OF PRODUCED GAS DISPOSITION
1. Facility Number
0290000031
2. Facility Name
RB GC 1
3. Field
PBU - WOA
4. Operator
BP
5. Month/Year of Disposition
February -2015
Disposition
Volume MCF
20. Forproduction from multiple pools, list contribution of each pool as a percent of
Total Volume.
6. Sold
Pool Name Pool Code Percent
7. Reinjected
0
PRUDHOE 640150 99.48%
LISBURNE 640144 0.28%
8. Flared or vented 1 hour or lessMIDNIGHT
1,410
SUN 640158 0.247/6
PT MCINTYRE 640180 0.00%
9. Flared or vented more than 1 hour (see instr.)
3,960
10. Pilot and Purge
51,246
11. Assist Gas
0
12. Fuel gas used in lease operations.
678,057
13. Other (see instructions)
0
Official Use Only
Authorization >1 hr:
Safety
� a �O
/
MCF
14. TOTAL VOLUME (ITEMS 6-12)
734,673
Lease Use
MCF
15. NGL Gas Equivalent
0
Conservation
MCF
16. Purchased gas
0
Waste:
MCF
17. Transferred from:
0
18. Transferred to: (Express as a negative #) CGF
-51,909,807
Commissioner Date
19. Remarks:
I hereby certify that the foregoing is true and correct to the best of my knowledge.
Signature _ (.,�fjt-✓� Title Manager Production Taxes ang Ro alties Alaska
Note: All volumes must be corrected
to pressure of 14.65 psis and to a
temperature of 60o F. Authority 20
AAC25.23&
Printed Name Diane Colley Phone (907) 564-5775 Date
V T �-
4flo/d�
Form 10-422 Rev. 5/2009 INSTRUCTIONS ON REVERSE SIDE Submit in Duplicate
BP EXPLORATION (ALASKA) INC.
PRUDHOE BAY UNIT -GC -1
GAS FLARING INCIDENT REPORT
February 2015
Unplanned Events less than or equal to 1 hour
TOTAL
DATE TIME
VOLUME DESCRIPTION OF INCIDENT & CAUSE
ACTION TAKEN TO ELIMINATE CAUSE
2/15/2015 2340-2359
60 Not required for unplanned events <= 1 hr
Not required for unplanned events <=1 hr
2/16/2015 2330-2400
530
Planned Events > 1 hour or
2/20/2015 0009-0010
10
TOTAL
600
Assist
Unplanned Events greater than 1 hour
TOTAL FLARED VOLUME
56,616
DATE TIME
VOLUME DESCRIPTION OF INCIDENT & CAUSE
ACTION TAKEN TO ELIMINATE CAUSE
2/1/2015 0920-1207
1,030 See attachments
See attachments
2/3/2015 1221-1433
1,910
2/5/2015 0835-1000
10
2/18/2015 1402-2127
60
2/27/2015 0730-1530
950
TOTAL
3,960
Planned Events Less Than or Equal 1 Hour AND <= 5,000 mcf
DATE TIME
VOLUME DESCRIPTION OF INCIDENT& CAUSE
ACTION TAKEN TO ELIMINATE CAUSE
2/5/2015 1709-1724
810 See attachments
See attachments
TOTAL
810
Planned Events Exceeding 1 Hour OR > 5,000 mcf
DATE TIME
VOLUME DESCRIPTION OF INCIDENT & CAUSE
ACTION TAKEN TO ELIMINATE CAUSE
See attachments
See attachments
TOTAL
0
Page 7
3/13/2015
2:18 PM
TOTAL
Unplanned Events < 1 Hour
600
Unplanned Events > 1 Hour
3,960
Planned Events < 1 hour and not
810
exceeding 5,000 VICE
Planned Events > 1 hour or
0
exceeding 5,000 MCF
Pilot Purge
51,246
Assist
0
TOTAL FLARED VOLUME
56,616
Page 7
3/13/2015
2:18 PM
Flare StartDate 02/01/2015
Flare End Date 02/28/2015
GCS Flare Report
Total Volume (MSCF) 5370
Report
Numbs System Date Start Time Stop Time
Duration
Intermittent
Black Smoke
Planned
Reported By
Volume
15-20 Controlled Blowdown 02/01/2015 9:20:00 am 12:07:00 pm
167 min
Yes
No
No
BP1\HELMIGBJ
1030
"A"
Determination Cause bank shutdown on equipment failure.
Action Taken Failure identified and repaired.
15-28 Controlled Blowdown 02/03/2015 12:21:00 pm 2:33:00 pm
132 min
No
No
No
BP1\KIRSCHW
1910
Determination Cause Ips discharge psv failure
Action Taken swapped psv's
15-28 Controlled Blowdown 02/05/2015 8:35:00 am 10:00:00 am
85 min
No
No
No
BP1\BROWNK
10
Determination Cause c bank 1st stage flare valve off seat
Action Taken reseated flare vavle
15-28 Flare Relief 02/05/2015 5:09:00 pm 5:24:00 pm
15 min
No
No
Yes
BP1\BIFFERDL
810
J
Determination Cause Took down LP Comp. K105 using too much lube oil. Brought up
K-106
t
Action Taken Brought other LP Compresor on line.
15-40 Flare Relief 02/18/2015 2:02:00 pm 9:27:00 pm 445 min Yes No
Determination Cause Intermittent flaring caused by gas rete swings due to downstream facility issues.
Action Taken None required. System self corrected
15-52 Flare Relief 02/27/2015 7:30:00 am 3:30:00 pm 480 min Yes
Determination Cause Leaking C -bank tat stg. flare valve
Action Taken Had to replace FV positioner
No No
BP1\SPRINGG 950
Total Volume (MSCF) 5370
Generated 03/08/2015 2:03:09PM Page 8 of 9
Hunt, Jennifer L (DOA)
From: AK, OPS PCC EOC TL <AKOPSPCCEOCTL@bp.com>
Sent: Friday, February 06, 2015 7:48 PM
To: Hunt, Jennifer L (DOA)
Cc: Loepp, Victoria T (DOA); Roby, David S (DOA); Castano, Alejandra; Benson, Gary A;
Arthur, Gregory; AK, HSSEE Env Adv West; Hauger, Wayne A; AK, OPS GC1 OSM; AK,
OPS GC1 Facility OTL, AK, OPS GC3&PCC OSM
Subject: Flaring Event atow
To: Jennifer Hunt, AOGCC CC: Dave Roby, AOGCC CC: Victoria Ferguson,
AOGCC
jennifer.huntCcD.alaska.gov dave.roby(d)alaska.gov victoria.ferouson(cDalaska.ct
ov
From: Jennifer Blake, GPB Production Optimization Team Leader
A flaring event occurred at GC1 02/01/2015 09:20 and stopping at 02/01/2015 12:07 with a volume of 1030 (MSCF). The
event lasted for 167 minutes and was due to an "A" bank shutdown on equipment failure. Flaring stopped when the
equipment failure was identified and repaired.
A flaring event occurred at GC1 starting at 02/03/2015 12:21 and stopping at 02/03/2015 14:33 with a volume of 1910
(MSCF). The event lasted for 132 minutes and was due to a PSV failure. Flaring stopped when the PSV was swapped.
A flaring event occurred at GC1 starting at 02/05/2015 08:35 and stopping at 02/05/2015 10:00 with a volume of 10
(MSCF). The event lasted for 85 minute and was due to C Bank 151 stage Flare valve traveling off its seat. Flaring stopped
when the flare valve was reseated.
Please let me know if you have any questions.
Thanks,
Jennifer Blake
PCC/EOC Production Optimization Team Lead
Office (907) 659-4472
Cell (907) 830-6204
Jennifer.blake(@bp.com
Hunt, Jennifer L (DOA)
From: AK, OPS PCC EOC TL <AKOPSPCCEOCTL@bp.com>
Sent: Saturday, February 21, 2015 6:40 PM
To: Hunt, Jennifer L (DOA)
Cc: Loepp, Victoria T (DOA); Roby, David S (DOA); Castano, Alejandra; Benson, Gary A;
Arthur, Gregory; AK, HSSEE Env Adv West; Hauger, Wayne A; AK, OPS GCI OSM; AK,
OPS GC1 Facility OTL; AK, OPS GC3&PCC OSM
Subject: Flaring Event atm
Categories: Attention
To: Jennifer Hunt, AOGCC CC: Dave Roby, AOGCC CC: Victoria Ferguson,
AOGCC
Lnnifer.hunt(dalaska.gov dave.robV(c alaska.gov victoria.ferguson(a)alaska.q
ov
From: Jennifer Blake, GPB Production Optimization Team Leader
An intermittent flaring event occurred at GC1 starting at 02/18/2015 14:02 and stopping at 02/18/2015 21:27 with a
volume of 60 (MSCF). The event lasted for 445 minutes and was due to downstream facility issues causing gas rate
swings. Flaring stopped when the downstream facility issues were resolved and the system self -corrected.
Please let me know if you have any questions.
Thanks,
Jennifer Blake
PCC/EOC Production Optimization Team Lead
Office (907) 659-4472
Cell (907) 830-6204
Jennifer.blake @bp.com
Hunt, Jennifer L (DOA)
From: AK, OPS PCC EOC TL <AKOPSPCCEOCTL@bp.com>
Sent: Monday, March 09, 2015 1:14 PM
To: Hunt, Jennifer L (DOA)
Cc: Loepp, Victoria T (DOA); Roby, David S (DOA); Castano, Alejandra; Benson, Gary A;
Arthur, Gregory; AK, HSSEE Env Adv West; AK, OPS CGF OTL; AK, OPS CCP CGF OSM;
Fortenberry, Christopher; AK, OPS GC3&PCC OSM
Subject: RE: Gas flaring event MOW
To: Jennifer Hunt, AOGCC CC: Dave Roby, AOGCC CC: Victoria Ferguson,
AOGCC
iennifechunt(a)alaska.gov dave.robyCcD.alaska.aov victoria.ferausonOaalaska.a
ov
From: Jennifer Blake, GPB Production Optimization Team Leader
A flaring event, specifically a leaking flare valve, has occurred at CGF. It started on 02/18/2015 and continued
through 02/21/15. Maintenance applied additional pressure to the actuator to seat the valve which temporarily
stopped the leaking until the valve could be isolated and rebuilt on 3/2. Upon teardown of the valve, it was
noted the cage was fine but the seats and plug needed replacement negating the need to wait 3 months for a cage
replacement. The valve has been repaired and the flaring has ceased.
02/18/2015 00:01 and stopping at 02/18/2015 23:59 with a volume of 622 (MSCF). The event lasted for 1438
minutes.
02/19/2015 00:01 and stopping at 02/19/2015 23:59 with a volume of 49 (MSCF). The event lasted for 1438
minutes.
02/20/2015 00:01 and stopping at 02/20/2015 23:59 with a volume of 1513 (MSCF). The event lasted for 1438
minutes.
02/21/2015 00:01 and stopping at 02/21/2015 23:59 with a volume of 218 (MSCF). The event lasted for 1438
minutes.
Thank you,
Jennifer Blake
PCC/EOC Production Optimization Team Lead
Office (907) 659-4472
Cell (907) 830-6204
Jennifer.blake@bp.com
From: AK, OPS PCC EOC TL
Sent: Saturday, February 21, 2015 6:52 PM
To: 'jennifer.hunt@alaska.gov'
Cc: 'Loepp, Victoria T (DOA) (victoria.loepp6 alaska.gov)'; "dave.roby@alaska.gov' (dave.robv(olalaska.00v)'; Castano,
Alejandra; Benson, Gary A; Arthur, Gregory; AK, HSSEE Env Adv West; AK, OPS CGF OTL; AK, OPS CCP CGF OSM;
Fortenberry, Christopher; AK, OPS GC3&PCC OSM
Subject: Gas flaring event at CGF
To: Jennifer Hunt, AOGCC CC: Dave Roby, AOGCC CC: Victoria Ferguson,
AOGCC
iennifer.hunt(walaska.gov dave.roby(aalaska.gov victoria.ferguson(a)alaska.g
ov
From: Jennifer Blake, GPB Production Optimization Team Leader
A flaring event, specifically a leaking flare valve, has occurred at CGF starting at 02/18/2015 00:01 and will be
ongoing until valve repair parts are received and the valve is repaired. The leaking valve requires a cage
replacement, which is an estimated 3 month lead time for the new parts. We will continue to log the event daily
to record gas volumes flared and I will follow up with a phone call on Monday
Thank you,
Jennifer Blake
PCC/EOC Production Optimization Team Lead
Office (907) 659-4472
Cell (907) 830-6204
lennifer.blake@bp.com
Hunt, Jennifer L (DOA)
From:
AK, OPS PCC EOC TL <AKOPSPCCEOCTL@bp.com>
Sent:
Monday, March 09, 2015 1:51 PM
To:
Hunt, Jennifer L (DOA)
Cc:
Loepp, Victoria T (DOA); Roby, David S (DOA); Castano, Alejandra; Benson, Gary A;
Arthur, Gregory; AK, HSSEE Env Adv West; Hauger, Wayne A; AK, OPS GCl OSM; AK,
OPS GCl Facility OTL; AK, OPS GC3&PCC OSM
Subject:
Flaring Event atm
To: Jennifer Hunt, AOGCC CC: Dave Roby, AOGCC CC: Victoria Ferguson,
AOGCC
iennifer.hunt(cDalaska.00v dave.robv(U2alaska.gov victoria.ferouson( alaska.o
ov
From: Jennifer Blake, GPB Production Optimization Team Leader
A flaring event occurred at GC1 starting at 02/27/2015 07:30 and stopping at 02/27/2015 15:30 with a volume of 950
(MSCF). The event lasted for 480 minutes and was due to a leaking C -bank 1't stage separator flare valve. Flaring
stopped when the flare valve positioner was replaced.
Please let me know if you have any questions.
Thanks,
Jennifer Blake
PCC/EOC Production Optimization Team Lead
Office (907) 659-4472
Cell (907) 830-6204
Jennifer.blake@bp.com
STATE OF ALASKA
ALASKA OIL AND GAS CONSERVATION COMMISSION
FACILITY REPORT OF PRODUCED GAS DISPOSITION
1. Facility Number
0290000031
2. Facility Name
PBU GC 1
3. Field
PBU - WOA
4. Operator
BP
5. MonthNear of Disposition
March -2015
Disposition
Volume MCF
20. For production from multiple pools, list contribution of each pool as a percent of
Total Volume,
6. Sold
Pool Name Pool Code Percent
7. Reinjected
O
PRUDHOE 640150 99.66%
LISBURNE 640144 0.22%
8. Flared or vented l hour or less
650
MIDNIGHTSUN 640158 0.12%
PT MCINTYRE 640180 0.00%
9. Flared or vented more than 1 hour (see instr.)
530
10. Pilot and Purge
56,576
11. Assist Gas
0
12. Fuel gas used in lease operations.
755,852
13. Other (see instructions)
6
Official Use Only
Authorization >1 hr:
Safety
�3
MCF
14. TOTAL VOLUME (ITEMS 6-12)
813,608
Lease Use
MCF
15. NGL Gas Equivalent
0
Conservation
MCF
16. Purchased gas
0
Waste:
MCF
17. Transferred from:
0
18. Transferred to: (Express as a negative #) CGF
-67,708,492
Commissioner Date
19. Remarks:
I hereby certify that the foregoing is true and correct to the best of my knowledge.
Note: All volumes must be corrected
Signature Title Manager Production Taxes and Royalties Alaska to pressure of 14.65 psis and to a
/. temperature of 60o F. Authority 20
`�{
Printed Name Diane Colley Phone (907) 564-5775 Date I kr AAC25.235.
V T 1--
51,11115-
Form
--
51rf1lS
Form 10422 Rev. 5/2009 INSTRUCTIONS ON REVERSE SIDE Submit in Duplicate
BP EXPLORATION (ALASKA) INC.
PRUDHOE BAY UNIT -GC -1
GAS FLARING INCIDENT REPORT
March 2015
(Unplanned Events less than or equal to 1 hour
DATE TIME VOLUME DESCRIPTION OF INCIDENT & CAUSE ACTION TAKEN TO ELIMINATE CAUSE
3/2/2015 0901-0907 80 Not required for unplanned events <= 1 hr Not required for unplanned events <= 1 hr
3/28/2015 1435-1535 570
TOTAL 650
DATE TIME VOLUME DESCRIPTION OF INCIDENT & CAUSE ACTION TAKEN TO ELIMINATE CAUSE
3/29/2015 1215-1410 530 See attachments See attachments
TOTAL 530
Planned Events Less Than or Equal 1 Hour AND <= 5,000 mcf
DATE TIME VOLUME DESCRIPTION OF INCIDENT & CAUSE ACTION TAKEN TO ELIMINATE CAUSE
See attachments See attachments
TOTAL 0
Planned Events Exceeding 1 Hour OR> 5,000 mcf
TOTAL
Unplanned Events < 1 Hour
Unplanned Events> 1 Hour
Planned Events < 1 hour and not
exceeding 5,000 MCF
Planned Events> 1 hour or
exceeding 5,000 MCF
Pilot Purge
Assist
TOTAL FLARED VOLUME
VOLUME DESCRIPTION OF IN
See attachments
0
TOTAL
650
530
0
0
56,576
0
57,756
See attachments
Page 6
4/11/2015
4:06 PM
Flare Start Date 03/01/2015
Flare End Date 03/31/2015
GC1 Flare Report
Total Volume (MSCF)
1190
Report
Numbs System Date Start Time
Stop Time Duration Intermittent
Black Smoke Planned Reported By
Volume
15-81 Controlled Blowdown 03/29/2015 12:15:00 pm
2'.10-.00 pm 115 min Yes
No No BP1\SPRINGG
530
Determination Cause Depressured D-95 to T -bank to repair leak @ wellpad.
Action Taken Done
Daily Volume (MSCF)
530
Total Volume (MSCF)
1190
Generated 04/03/2015 3.26.36PM Page 7 of 8
woo -a q @ alelq•ja;!uuar
bOZ9-0£8(L06)IIaO
ZLbb-6S9 (L06) aO1.40
peal weal uo!lez!w!ld0 uollOnpad 003/OOd
aNn/g jafiuuar
'quegl
suol;senb (ue aneg no (;I mou)l GW lei aseald
aowas o; �oeq lg6naq aull pue pailedai seen deal ay; uagm paddols 6uueld 'ped llam
le �eal a xg o; Nueq-1 g6noag; awlmog 960 6ulzunssajdep o; anp sem pue sa;nulw g l ! jo; pa;sel;uana agl '(dOSW)
O£9 10 awnlon a g;lm Ol til 9LOZ/6Z/£0 le l5wd6o;s pue 9;:Z1 9l OZ/6Z/£0 le buluels 1.00;e pawn000;uana 6uuel; V
japeal weal uollezlwlld0 uol;onpad OdO '9slel8 ja;luuar :wad
Aob else a uosn ja;'euo;Oln no 'eAsele ;unq'ja;luua.
0000V 'uosn6jad euo;o!n :00 0000V 'lunH Jal!uusr :ol
T09;e;uan3 6u1je13 :321 :30afgo5
WSO OOd?B£09
110 L4!IPe3 T09 SdO')IV :WSO TOO SdO ')IV 'V auAeM'ja6neH ';saM APV nu3
'tio6ajg 'ing),jV (V tieg 'uosuag'eJpuefalV 'ouelse0'(VOO) 1 euo;:)lA 'ddaol :>>
(VO(l) l aa}luua('lunH :ol
Wd 6b:ZT STOZ'TO I!jdV'lepsaupaM :luas
<wo0'dq@u 1100300dSdO)IV> ll 003 OOd SdO 'SIV :wojd
(vou) l ja;iuuar ';unH
STATE OF ALASKA
ALASKA OIL AND GAS CONSERVATION COMMISSION
FACILITY REPORT OF PRODUCED GAS DISPOSITION
RECEIVED
MAY 14 2015
AOGCC
1. Facility Number
0290000031
2. Facility Name
PBU GC 1
3. Field
PBU - WOA
4. Operator
BP
5. MonthNear of Disposition
I April -2015
Disposition
Volume MCF
20. For production from multiple pools, list contribution of each pool as a percent of
Total Volume,
6. Sold
0
Pool Name PoolCode Percent
7. Reinjected
O
PRUDHOE 640150 99.24%
LISBURNE 640144 0.65%
8. Flared or vented 1 hour or less
4,350
MIDNIGHT SUN 640158 0.11°/
PT MCINTYRE 640180 0.00%
9. Flared or vented more than 1 hour (see instr.)
2,300
10. Pilot and Purge
54,675
11. Assist Gas
0
12. Fuel gas used in lease operations.
682,806
13. Other (see instructions)
G
Official Use Only
Authorization >t hr:
Safety
z � fy p
MCF
14. TOTAL VOLUME (ITEMS 6-12)
744,131
Lease Use
MCF
15. NGL Gas Equivalent
0
Conservation
MCF
16. Purchased gas
0
Waste:
MCF
17. Transferred from:
0
f
18. Transferred to: (Express as a negative #) CGF
-62,852,506
Commissioner Date
19. Remarks:
I hereby certify that the foregoing is true and correct to the best of my knowledge.
�� (///���" tI/nn-/t44nlf/1',,,' Note: All volumes must be corrected
Signature l 1Nf IL, lei'-� Title Manager Production Taxes and Ro pities Alaska to pressure of 14.65 psis and t0 a
&a
temperature of 60o F. Authority 20
Printed Name Diane Colley Phone (907) 564-5775 Date V/11AAC25.235.
VTL
°f/trs/ls
Form 10-422 Rev. 5/2009 INSTRUCTIONS ON REVERSE SIDE Submit in Duplicate
BP EXPLORATION (ALASKA) INC.
PRUDHOE BAY UNIT -GC -1
GAS FLARING INCIDENT REPORT
April 2015
RECEIVED
MAY 14 2015
Unplanned Events less than or equal to 1 hour
TIME
DATE
TIME VOLUME DESCRIPTION OF INCIDENT & CAUSE ACTION TAKEN TO ELIMINATE CAUSE
4/4/2015
1400-1407
270 Not required for unplanned events <= 1 hr Not required for unplanned events <= 1 hr
4/7/2015
0935-0955
290
4/24/2015
1929-1938
980
4/24/2015
2303-2334
1,860
DATE
TOTAL
3,400
uAI a
TIME
VOLUME DESCRIPTION OF INCIDENT & CAUSE
ACTION TAKEN TO ELIMINATE CAUSE
4/22/2015
0745-0900
250 See attachments
See attachments
TOTAL
250
Planned Events Less Than or Equal 1 Hour AND <= 5,000 mcf
DATE
TIME
VOLUME DESCRIPTION OF INCIDENT & CAUSE
ACTION TAKEN TO ELIMINATE CAUSE
4/3/2015
0216-0230
670 See attachments
See attachments
4/19/2015
1741-1748
280
TOTAL
950
Planned Events Exceeding 1 Hour OR > 5,000 mcf
DATE TIME VOLUME DESCRIPTION OF INCIDENT & CAUSE ACTION TAKEN TO ELIMINATE CAUSE
4/15-16/2015 2130-0331 2,050 See attachments See attachments
TOTAL 2,050
Unplanned Events < 1 Hour
Unplanned Events > 1 Hour
Planned Events < 1 hour and not
exceeding 5,000 MCF
Planned Events > 1 hour or
exceeding 5,000 MCF
Pilot Purge
Assist
TOTAL FLARED VOLUME
TOTAL
3,400
250
950
2,050
54,675
0
61,325
Page 7
5/13/2015
1:24 PM
Flare Start Date 04/01/2015
Flare End Date 04/30/2015
GC1 Flare Report
Total Volume (MSCF) 6650
Report
Numbs System
Date StartTime Stop Time Duration
Intermittent Black Smoke
Planned Reported By
Volume
15-92 Controlled Blowdown 04/03/2015 2:16:00 am 2:30.00 am 14 min
No No
Yes BPt\SPRINGG
670
Determination Cause
Depressured D-86/87 through Test bank forfield work
Action Taken
Depressure done
Daily Volume (MSCF)
670
Alli
n— \ICA
MAY 14 W5
AOGCC
15-110 Controlled Slowdown 04/15/2015 9:30:00 pm 11:59:00 pm 149 min
No No
Yes BP1\SHELTI
1860
Determination Cause
Took Y/P LDF down for a pressure test and spin cooling K-7001
for a waterwash
Action Taken
Flaring will stop once work is finished
Daily Volume (MSCF)
1860
15-111 Controlled Biowdown 04/16/2015 12:00:00 am 3:31:00 am 211 min
No No
Yes BP1\SHELT1
190
Determination Cause
Spin cooled K-7001 for waterwash and performed waterwash
Action Taken
Stop when job is complete
Daily Volume (MSCF)
190
15-114 Controlled Slowdown 04/19/2015 5:41:00 pm 5:48:00 pm 7 min
No No
Yes 131`7\SHELTI
280
Determination Cause
Flare for K-3300 depressurs
Action Taken
stop when job is complete
Daily Volume (MSCF)
280
15-117 Controlled Slowdown 04/22/2015 7:45:00 am 9:00:00 am 75 min
Yes No
No BP1u3PRINGG
250
Determination Cause
Swapped GLT machines
Action Taken
done
Daily Volume (MSCF)
250
Total Volume (MSCF)
6650
Generated 05/08/2015 4:16:54PM Page 8 of 10
Hunt, Jennifer L (DOA)
From: AK, OPS PCC EOC TL <AKOPSPCCEOCTL@bp.com>
Sent: Sunday, April 26, 2015 1:54 PM
To: Hunt, Jennifer L (DOA)
Cc: Loepp, Victoria T (DOA); Castano, Alejandra; Benson, Gary A; Arthur, Gregory; AK, HSSEE
Env Adv West; AK, OPS GC3&PCC OSM; AK, OPS GCI Facility OTL; Borton, Kim; AK, OPS
GCI OSM
Subject: Flaring Event at GC1
To: Jennifer Hunt, AOGCC CC: Victoria Ferguson, AOGCC
iennifer.hunt(o)alaska.aov victoria.ferguson aaalaska.aov
From: Jennifer Blake, GPB Production Optimization Team Leader
A flaring event occurred at GC1 starting at 04/15/2015 21:30 and stopping at 04/15/2015 23:59 with a volume of 1860
(MSCF). The event lasted for 149 minutes and was due a pressure test of Y/P LDF (Large Diameter Flowline) and spin
cooling K-7001 for water wash. Flaring stopped when the pressure test and spin cool were completed.
Please let me know if you have any questions.
Thanks,
Jennifer Blake
PCC/EOC Production Optimization Team Lead
Office (907) 659-4472
Cell (907) 830-6204
Jennifer.blake@bp.com
Hunt, Jennifer L (DOA)
From:
AK, OPS PCC EOC TL <AKOPSPCCEOCTL@bp.com>
Sent:
Sunday, April 26, 2015 1:58 PM
To:
Hunt, Jennifer L (DOA)
Cc:
Loepp, Victoria T (DOA); Castano, Alejandra; Benson, Gary A; Arthur, Gregory; AK, HSSEE
Env Adv West; AK, OPS GC3&PCC OSM; AK, OPS GC1 Facility OTL; Borton, Kim; AK, OPS
GC1 OSM
Subject:
Flaring Event at GC1
To. Jennifer Hunt, AOGCC CC: Victoria Ferguson, AOGCC
iennifer.hunt(a(<7alaska.gov victoria.ferguson(a)alaska.aov
From: Jennifer Blake, GPB Production Optimization Team Leader
A flaring event occurred at GC1 starting at 04/17/2015 00:00 and stopping at 04/17/2015 03:31 with a volume of 190
(MSCF). The event lasted for 211 minutes and was due to spin cooling K-7001 compressor for water wash. Flaring
stopped when the spin cool was completed.
Please let me know if you have any questions.
Thanks,
Jennifer Blake
PCC/EOC Production Optimization Team Lead
Office (907) 659-4472
Cell (907) 830-6204
Jennifer.blakePbp.com
Hunt, Jennifer L (DOA)
From: AK, OPS PCC EOC TL <AKOPSPCCEOCTL@bp.comn
Sent: Sunday, April 26, 2015 2:01 PM
To: Hunt, Jennifer L (DOA)
Cc: Loepp, Victoria T (DOA); Castano, Alejandra; Benson, Gary A; Arthur, Gregory; AK, HSSEE
Env Adv West; AK, OPS GC3&PCC OSM; AK, OPS GC1 Facility OTL; Borton, Kim; AK, OPS
GC1 OSM
Subject: Flaring Event at GC1
To: Jennifer Hunt, AOGCC CC: Victoria Ferguson, AOGCC
jenniter.hunt( alaska.aov victoria.ferouson(aDalaska.aov
From: Jennifer Blake, GPB Production Optimization Team Leader
A flaring event occurred at GC1 starting at 04/22/2015 07:45 and stopping at 04/22/2015 09:00 with a volume of 250
(MSCF). The event lasted for 75 minutes and was due to swapping gas lift compressors. Flaring stopped when the swap
was complete.
Please let me know if you have any questions.
Thanks,
Jennifer Blake
PCC/EOC Production Optimization Team Lead
Office (907) 659-4472
Cell (907) 830-6204
Jennifer.blake@bp.com
Hunt, Jennifer L (DOA)
From: AK, OPS PCC EOC TL <AKOPSPCCEOCTL@bp.com>
Sent: Sunday, April 26, 2015 2:16 PM
To: Hunt, Jennifer L (DOA)
Cc: Loepp, Victoria T (DOA); Castano, Alejandra; Benson, Gary A; Arthur, Gregory; AK, HSSEE
Env Adv West; AK, OPS GC3&PCC OSM; AK, OPS GCl Facility OTL; Barton, Kim; AK, OPS
GCl OSM
Subject: Flaring Event at GCl
To: Jennifer Hunt, AOGCC CC: Victoria Ferguson, AOGCC
Jennifer huntCc alaska.aov victoria ferguson(c alaska.aov
From: Jennifer Blake, GPB Production Optimization Team Leader
Two flaring event occurred at GC1 on 04/17/2015:
1. Starting at 19:29 and stopping at 19:38 with a volume of 980 (MSCF). The event was a black smoke event and
was due to a low pressure divert valve hanging open causing a high rate into C Slug Catcher sending it to
flare. Flaring stopped when the divert valve was closed.
2. Starting at 23:03 and stopping at 23:34 with a volume of 1860 (MSCF). The event was a black smoke event and
was due to a 30" rupture disk rupturing and relieving though a PSV. Flaring stopped when the PSV and rupture
disk were swapped.
Please let me know if you have any questions.
Thanks,
Jennifer Blake
PCC/EOC Production Optimization Team Lead
Office (907) 659-4472
Cell (907) 830-6204
Jennifer.blake@bp.com
STATE OF ALASKA
ALASKA OIL AND GAS CONSERVATION COMMISSION
FACILITY REPORT OF PRODUCED GAS DISPOSITION
RECEIVED
JUN 16 2015
AOGCC
1. Facility Number
0290000031
2. Facility Name
PBU GC 1
3. Field
PBU - WOA
4. Operator
BP
5. MonlhNear of Disposition
I May -2015
Disposition
Volume MCF
20. For production from multiple pools, list contribution of each pool as a percent of
Total Volume.
6. Sold
0
Pool Name Pool Code Percent
7. ReinjectedO
PRUDHOE 640150 99.48E
LISBURNE 640144 0.40%
8. Flared or vented 1 hour or less
2,270
MIDNIGHTSUN 640158 0.12%
PT MCINTYRE 640180 0.00%
9. Flared or vented more than 1 hour (see instr.)
13,675
10. Pilot and Purge
56,711
11. Assist Gas
0
12. Fuel gas used in lease operations.
681,891
13. Other (see instructions)
0
Official Use Only
Authorization >7 hr:
Safety
MCF
14. TOTAL VOLUME (ITEMS 6-12)
754,547
Lease Use
MCF
15. NGL Gas Equivalent
0
Conservation
MCF
16. Purchased gas
0
Waste:
MCF
17. Transferred from:
0
1
/ _
�
-27- 0 ' l s
Commissioner r�.,Date
18. Transferred to: (Express as a negative #) CGF
-56,116,331
19. Remarks:
I hereby certify that the foregoing is true and correct to the best of my knowledge.
Note: All volumes must be corrected
Signature Title Mana er Production Taxes and Ro hies Alaska to pressure Of 14.65 psis and t0 a
temperature of 60o F. Authority 20
Printed Name Diane Colley Phone (907) 564-5775 Date 1,41141-45—
, / / AAC25.235.
VTL
;T175-11 6'
Form 10-422 Rev. 512009 INSTRUCTIONS ON REVERSE SIDE Submit in Duplicate
BP EXPLORATION (ALASKA) INC.
PRUDHOE BAY UNIT - GC -1
GAS FLARING INCIDENT REPORT
May 2015
RECEIVED
JUN 16 2015
'� ®GGG
Lnplanned Events less than or equal to 1 hour
DATE TIME VOLUME DESCRIPTION OF INCIDENT & CAUSE ACTION TAKEN TO ELIMINATE CAUSE
5/1/2015 1540-1548 230 Not required for unplanned events <= 1 hr Not required for unplanned events <= 1 hr
5/2/2015 1606-1625 500
TOTAL 730
Page 9
5/1/2015
0134-0530
1,870 See attachments See attachments
5/19/2015
1016-1200
30
TOTAL
1,900
Planned Events Less Than or Equal 1
Hour AND <= 5,000 mcf
DATE
TIME
VOLUME DESCRIPTION OF INCIDENT & CAUSE ACTION TAKEN TO ELIMINATE CAUSE
5/11/2015
2121-2129
300 See attachments See attachments
5/11/2015
2155-2159
130
5/18/2015
2116-2144
90
5/23/2015
2211-2216
320
5/24/2015
1145-1159
430
5/25/2015
0740-0754
230
5/27/2015
0702-0746
40
TOTAL
1,540
5/11/2015
5/16/2015
5/22/2015
5/27/2015
1358-1730
0510-2050
1020-1300
1243-1345
TOTAL
90 See attachments
10,735
810
140
11,775
See attachments
6/12/2015
10:03 AM
BP EXPLORATION (ALASKA) INC.
PRUDHOE BAY UNIT - GC -1
GAS FLARING INCIDENT REPORT
May 2015
RECEIVE®
JUN 16 2015 Page 10
6/12/2015
10:03 AM
TOTAL
Unplanned Events < 1 Hour
730
Unplanned Events> 1 Hour
1,900
Planned Events < 1 hour and not
1,540
exceeding 5,000 MCF
Planned Events > 1 hour or
11,775
exceeding 5,000 MCF
Pilot Purge
56,711
Assist
0
TOTAL FLARED VOLUME
72,656
RECEIVE®
JUN 16 2015 Page 10
6/12/2015
10:03 AM
OL JO g abed WV6E:ss:9 SLOZ/BO/90 Palwaua0
sneda»oJ eu!4oew 1l0 OOEE-)16uunsswjda0 asne3 uopeu!uueleO
ME
MHOS81AW8 saA
ON
ON
ww9 wd00:91.:01. wd00:1.FO1. S1.0Z/£Z/SO la!lam meld 61,V91.
Me
(jOSVJ) awnloA Apeo
paddems saul4oew auou ual!el uopoV
saul4oew ll0 6wddems asneo uopeulwialad
Me
MHOSHIAW8 SBA
ON
ON
ulw 091. wd 00:00:1. we OO:OZ:OL SLOZ/ZZ/90 Japan Bleld LI' 91.
o£
(jOSW) own!oA RI!e0
alenbape swam slanal aouo paddols uaL(ei uopoy
O/S 8 u! SIanal 4sllgels3 esnep uopewwjalap
OE
L1l3HS"de ON
ON
saA
u!w 601. wdoo:oo:z1 we00'9L:01. SLOZ/61./90 Jallam aielj 941.-91.
06
(dOSW) awn!oA LIIeO
..--------.—
.---_---
---
--
Buluum si jossaidwoo aouo 6uuelj dOjS uaMel uopoV
LOOL->I papLjq esneo uopeu!wala0
06
U-13HS\Ld8 SBA
ON
ON
up 9Z wd oo:bp:6 wd0091.:6 MZ/91,/90 JaRem meld 91,V91.
9ELOL
(dOSW) awnIOA Rl!eO
'suop sem nedw aouo paddols 6uuelj ua>1e140I1ov
901. -II uo Heal leas nedam asneO uo!Ieu!wualaO
6 9£LM
L1l3HS\Ld8 saA
ON
ON
u!w 046 wd OO:OS:9 we9o:Ol:9 9LOZ/91./90 Jallam WSW CK -91.
OZ9
(dOSW)awnIOA Apo
pamssaidep Sem IDOL -)I ua4m paddols Buue!j ual!ei uopoy
umopin4sjaye LOOL->lamssaidapol6uuelj esneouopeu!uuelso
0£1.
mm11VNAld8 saA
ON
ON
mwb wd 00:69:6 wd00:99:6 91.0Z/LUSO Japan afield BEL -91.
pamssaadep sem OOE£-e ua4m paddols 6uuelj uaHei uopoV
umopin4sjelJeooee->Iejnmidepol6uuelj esne0uo!leuiwjala0
WE
HH11VVMd8 saA
ON
ON
ww8 wd 00:6Z:6 wd OO:LZ:6 SLOZ/l1./90 Jallaa Suelj 9EL-91.
'6umuw pue do sem OOZE -N ua4m paddols 6uuelj ua)!el uonoV
ooze -N to eels pue e6md eta Buunp 6uueld asne0 uopeu!wielaO
06
N811V1M1.d8 saA
ON
SOA
ww ZLZ wd 00-0e:S wd00:99:L 9LOZ/LL/9O la!lam Welj 9E1.-91.
V V 0ov
510a 9I Nnr
paz!Ilgels Salem uaHel u0140V
1!wp Al!peiado IOd SAE Jo PPS ww OLS 841
papaaoxa Sales se6 u94mJSAO"So 031/6UlPOO9JOj0MUo0luanwd of 6wuado amen well Shc Pale!l!ul walsRS uo9uanwd JOAO AueO941 esnepuopeu!wJalap
OL91, 00NImdS\Id8 ON ON SOA ulw 9EZ we OO:Oc:9 we 0034E:L SLOZAO/SO lallam welj 9ZL-91.
ewnloA Ag popodem pauueld aAowS Aoel8 lueA!uuelul uopeinp ewli dols swll lielS alep welsAS egwnN
Idodea
91"M (dOSW) ewnloA leloi
podab weld T:)9
9wz/1.E/90 BIRO pug aje!j
SLOz/Lo/9O BIRO uelS eJe!j
Flare Start Date 05/01/2015
Flare End Date 05/31/2015
Action Taken none planned event
Daily Volume (MSCF) 320
15-152 Flare Relief 05/24/2015 11:45:00 am 11:59:00 am 14 min No No Yes BP1\KIRSCHW 430
Determination Cause depressure Cslugoatcher
Action Taken none planned event
Daily Volume (MSCF) 430
15-155 Controlled Blowdown 05/25/2015 7:40:00 am 7:54:00 am 14 min No No Yes
Determination Cause Depressure G-43 through T -bank for Field OPS work
Action Taken Depressured
Daily Volume (MSCF) 230
15-159 Controlled Blowdown 05/27/2015 7:02:00 am 7:46:00 am 44 min No No Yes
Determination Cause Depressured GA2 for wellpad OPS
Action Taken Depressured
15-159 Controlled Blowdown 05/27/2015 12:43:00 pm 1:45:00 pm 62 min No No Yes
Determination CaUSe Depressured G-47 for wellpad OPS
Action Taken Depressured
Daily Volume (MSCF)
BPlZPRINGG 230
RECEIVED
JUN 16 2015
A®GCC
131`1\SPRINGG 40
BP1\SPRINGG 140
180
Total Volume (MSCF) 15945
Generated 06/08/2015 8:53:39AM Page 9 of 10
STATE OF ALASKA
ALASKA OIL AND GAS CONSERVATION COMMISSION
FACILITY REPORT OF PRODUCED GAS DISPOSITION
1. Facility Number
0290000031
2. Facility Name
PBU GC 1
3. Field
PBU - WOA
4. Operator
I BP
5. MonthNear of Disposition
June -2015
Disposition
Volume MCF
20. For production from multiple pools, list contribution of each pool as a percent of
Total Volume.
6. Sold
D
Pool Name Pool Code Percent
7. Reinjected
0
PRUDHOE 640150 98.65%
LISBURNE 640144 1.19%
8. Flared or vented 1 hour or less
690
MIDNIGHT SUN 640158 0.16%
PT MCINTYRE 640180 0.00%
9. Flared or vented more than 1 hour (see matt.)
3,930
10. Pilot and Purge
54,339
11. Assist Gas
0
12. Fuel gas used in lease operations.
580,088
13. Other (see instructions)
0
Official Use Only
Authorization >t he
Safety
MCF
14. TOTAL VOLUME (ITEMS 6-12)
639,047
Lease Use
MCF
15. NGL Gas Equivalent
0
Conservation
MCF
16. Purchased gas
0
Waste:
MCF
17. Transferred from:
0
`7 J
18. Transferred to: (Express as a negative #) CGF
-54,139,752
Commissioner Date
19. Remarks:
I hereby certify that the foregoing is true and correct to the best of my knowledge.
Note: All volumes must be corrected
Signature 63fyi iJ Title Mana er Production Taxes and Royalties Alaska to pressure Of 14.65 psis and to a
temperature of 60o F. Authority 20
Printed Name Diane Colley Phone (907) 564-5775 Dale AAC25.235.
Form 10-422 Rev. 5/2009 INSTRUCTIONS ON REVERSE SIDE Submit in Duplicate
BP EXPLORATION (ALASKA) INC.
PRUDHOE BAY UNIT - GC -1
GAS FLARING INCIDENT REPORT
June 2015
Page 11
Unplanned Events less than or equal to 1 hour
DATETIME
VOLUME DESCRIPTION OF INCIDENT & CAUSE
ACTION TAKEN TO ELIMINATE CAUSE
6/22/2015 0915-0927
120 Not required for unplanned events <= 1 hr
Not required for unplanned events <= 1 hr
6/30/2015 2015-2026
270
TOTAL
390
Unplanned Events greater than 1 hour
DATE TIME
VOLUME DESCRIPTION OF INCIDENT & CAUSE
ACTION TAKEN TO ELIMINATE CAUSE
6/5/2015 0730-1500
920 See attachments
See attachments
6/13/2015 1023-2328
150
6/23/2015 1350-1625
180
6/24/2015 0908-1100
1,260
6/30/2015 1215-1327
660
TOTAL
3,170
Planned Events Less Than or Equal 1 Hour AND <= 5,000 mcf
DATE TIME
VOLUME DESCRIPTION OF INCIDENT & CAUSE
ACTION TAKEN TO ELIMINATE CAUSE
6/2/2015 1037-1050
20 See attachments
See attachments
6/26/2015 1530-1537
230
6/26/2015 1841-1853
50
TOTAL
300
6/21/2015
6/30/2015
1600-1840
1030-1300
TOTAL
80 See attachments
680
760
ACTION TAKEN TO ELIMINATE CAUSE
See attachments
7/15/2015
3:53 PM
BP EXPLORATION (ALASKA) INC.
PRUDHOE BAY UNIT - GC -1
GAS FLARING INCIDENT REPORT
June 2015
Page 12
7/15/2015
3 53 PM
TOTAL
Unplanned Events < 1 Hour
390
Unplanned Events> 1 Hour
3,170
Planned Events < 1 hour and not
300
exceeding 5,000 MCF
Planned Events> 1 hour or
760
exceeding 5,000 MCF
Pilot Purge
54,339
Assist
0
TOTAL FLARED VOLUME
58,959
Page 12
7/15/2015
3 53 PM
Flare Start Date 06/01/2015
Flare End Date 06/30/2015
GC1 Flare Report Total Volume (MSCF) 4620
Report
No Yes BPt\SPRINGG
50
Determination Cause Leak test was done on A-S/C. Vented
Numbs System Date StartTime Stop Time Duration
Intermittent
Black Smoke Planned Reported By
Volume
15-170 Flare Relief 06/02/2015 10:37:00 am 10:50:00 am 13 min
No
No Yes BP1\SPRINGG
20
Determination Cause Depressured Test bank to remove a dead leg
No Yes BP1\SELFJR
680
Determination Cause TAKE G43 FLOWLINE DOWN USING TEST BANK FOR MAINT.
Action Taken Depressure complete
Action Taken DEPRESSURE G-43 FLOWLINE FOR MAINT FOR FIELDCREW .DEPRESSURE COMPLETE AND FLARE VALVE TO NORMAL
-- - CLOSEI)P9SFFKW
--------
Daily Volume (MSCF)
20
15-173 Flare Relief 06/05/2015 7:30:00 am 3:00:00 pm 450 min
Yes
No No BP1\SELFJR
920
Determination Cause fLARE OFF A -SLUG CATCHER FOR HEATER REPLACEMENTS
Action Taken No response taken as this was deemed to be of short duration.
Daily Volume (MSCF)
920
15-169 Flare Relief 06/13/2015 10:23:00 am 11:28:00 pm 785 min
Yes
No No BP1\SHELTI
150
Determination Cause While bringing production rates up D -bank 2nd stg. was flaring
Action Taken Once rates were stable flaring stopped
Daily Volume (MSCF)
150
15-199 Controlled Blowdown 06/21/2015 4:00:00 pm 6:40:00 pm 160 min
No
No Yes BPt\SPRINGG
80
Determination Cause Flared off Annex for GT21 job
Action Taken Flaring done
Daily Volume (MSCF)
80
Daily Volume (MSCF)
120
15-202 Controlled Blowdown 06/23/2015 1:50:00 pm 4:25:00 pm 155 min
Yes
No No 131`1\SPRINGG
180
Determination Cause Flared off ANNEX due togas plant losing some boosters
Action Taken Flaring complete
Daily Volume (MSCF)
180
15-206 Controlled Blowdown 06/24/2015 9:08:00 am 11:0000 am 112 min
No
No No SP1\SPRINGG
1260
Determination Cause Flared G-45 to Zero through test bank
Action Taken done
Daily Volume (MSCF)
1260
15-212 Controlled Blowdown 06/26/2015 3:30:00 pm 3:37:00 pm 7 min
No
No Yes BP1\SPRINGG
230
Determination Cause Swapped T bank; HP to LP
Action Taken swap complete
15-212 Controlled Slowdown 06/26/2015 6:41:00 pm 6:53:00 pm 12 min No
No Yes BPt\SPRINGG
50
Determination Cause Leak test was done on A-S/C. Vented
Action Taken Vented complete
Daily Volume (MSCF)
280
15-225 Controlled Slowdown 06/30/2015 10:30:00 am 1:00:00 pm 150 min Yes
No Yes BP1\SELFJR
680
Determination Cause TAKE G43 FLOWLINE DOWN USING TEST BANK FOR MAINT.
Action Taken DEPRESSURE G-43 FLOWLINE FOR MAINT FOR FIELDCREW .DEPRESSURE COMPLETE AND FLARE VALVE TO NORMAL
-- - CLOSEI)P9SFFKW
--------
15-225 Controlled Slowdown 06/30/2015 12:15:00 pm 1:27:00 pm 72 min Yes
No No BP1\SPRINGG
660
Determination Cause Pigging Y-LDF
Generated 07/02/2015 3:52:31 PM Page 9 of 12
Flare Start Date 06/01/2015
Flare End Date 06/30/2015
Action Taken pigging done
Total Volume (MSCF) 4620
Generated 07/02/2015 3:52:31 PM Page 10 of 12
Hunt, Jennifer L (DOA)
From: AK, OPS PCC EOC TL <AKOPSPCCEOCTL@bp.com>
Sent: Sunday, June 07, 2015 5:08 PM
To: Hunt, Jennifer L (DOA)
Cc: Loepp, Victoria T (DOA); Castano, Alejandra; Benson, Gary A; Arthur, Gregory; AK, HSSEE
Env Adv West; AK, OPS GC3&PCC OSM; Barton, Kim; AK, OPS GC1 Facility OTL; AK, OPS
GQ OSM
Subject: Flaring Event a
To: Jennifer Hunt, AOGCC CC: Victoria Ferguson, AOGCC
iennifer.hunt(a alaska.gov victoria.ferguson(d,)alaska.gov
From: David Spall, GPB Production Optimization Team Leader
A flaring event occurred at GC1 starting at 06/05/2015 07:30 and stopping at 06/05/2015 15:00 with a volume of 920
(MSCF). The event lasted for 450 minutes and was due to Flare -off A -Slug catcher for heater replacements. The event
stopped when production was moved to C -Slug Catcher.
Thanks,
Dave
David Spall (Alternate —Jennifer Blake)
PCC/EOC Production Optimization Team Lead
907-659-4472 Office
219-689-4036 Cell
david.spa l l Caf bp.com
Hunt, Jennifer L (DOA)
From:
AK, OPS PCC EOC TL <AKOPSPCCEOCTL@bp.com>
Sent:
Monday, lune 15, 2015 6:28 AM
To:
Hunt, Jennifer L (DOA)
Cc:
Loepp, Victoria T (DOA); Castano, Alejandra; Benson, Gary A; Arthur, Gregory; AK, OPS
GC3&PCC OSM; Borton, Kim; AK, HSSEE Env Adv West; AK, OPS GC1 Facility OTL; AK,
OPS GC1 OSM
Subject:
Correction Flaring Event amn
Subject line was incorrect on the initial submission below. It should have stated Flaring event at GC1.
I apologize for the mistake.
Thank You
Dave
David Spall (Alternate—Jennifer Blake)
PCC/EOC Production Optimization Team Lead
907-659-4472 Office
219-689-4036 Cell
david.spall@bp.com
From: AK, OPS PCC EOC TL
Sent: Sunday, June 14, 2015 5:56 PM
To: 'jennifer.hunt@alaska.gov'
Cc: Loepp, Victoria T (DOA) (victoria.loepp(aaalaska.00v); Castano, Alejandra; Benson, Gary A; Arthur, Gregory; AK, OPS
GC3&PCC OSM; Borton, Kim; AK, HSSEE Env Adv West; AK, OPS GC1 Facility OTL; AK, OPS GC1 OSM
Subject: Flaring Event at GC3
To: Jennifer Hunt, AOGCC CC: Victoria Loepp, AOGCC
iennifer hunt(o)alaska.00v Victoria. loeppCa alaska.aov
From: David Spall, GPB Production Optimization Team Leader
A flaring event occurred at GC1 starting at 06/13/2015 10:23 and stopping at 06/13/2015 23:28 with a volume of 150
(MSCF). The event lasted for 785 minutes and was due to flaring while bringing rates up on D -Bank 2m stage. The event
stopped once rates were stable.
Thanks
Dave
David Spall (Alternate —Jennifer Blake)
PCC/EOC Production Optimization Team Lead
907-659-4472 Office
219-689-4036 Cell
david.spall@bp.com
Hunt, Jennifer L (DOA)
From: AK, OPS PCC EOC TL <AKOPSPCCEOCTL@bp.com>
Sent: Friday, June 26, 2015 8:37 AM
To: Hunt, Jennifer L (DOA)
Cc: Loepp, Victoria T (DOA); Castano, Alejandra; Benson, Gary A; Arthur, Gregory; AK, HSSEE
Env Adv West; AK, OPS GC3&PCC OSM; Borton, Kim; AK, OPS GC1 Facility OTL; AK, OPS
GC1 OSM
Subject: Flaring Event a
To: Jennifer Hunt, AOGCC CC: Victoria Ferguson, AOGCC
a ennifer.hunt(a)alaska.00v victoria.ferouson(o)alaska.gov
From: Jennifer Blake, GPB Production Optimization Team Leader
A flaring event occurred at GC1 starting at 06/21/2015 16:00 and stopping at 06/21/2015 18:40 with a volume of 80
(MSCF). The event lasted for 160 minutes and was due to a Tandem Compressor Trip at CGF spiking transit line
pressure at the GT21 derate location. The event stopped when production was cut to reduce pressure on GT21.
A flaring event occurred at GC1 starting at 06/23/2015 13:50 and stopping at 06/23/2015 16:25 with a volume of 180
(MSCF). The event lasted for 155 minutes and was due a Tandem Compressor Trip at CGF spiking transit line pressure
at the GT21 derate location. The event stopped when production was cut to reduce pressure on GT21.
A flaring event occurred at GC1 starting at 06/24/2015 09:08 and stopping at 06/24/2015 11:00 with a volume of 1260
(MSCF). The event lasted for 112 minutes and was due to depressurizing G-45 to zero through test bank. The event
stopped when depressurization was completed..
Thanks,
Jennifer Blake
PCC/EOC Production Optimization Team Lead (alt David Spall)
Office (907) 659-4472
Cell (907) 830-6204
Jennifer.blake@bp.com
Hunt, Jennifer L (DOA)
From: AK, OPS PCC EOC TL <AKOPSPCCEOCTL@bp.com>
Sent: Tuesday, June 30, 2015 12:12 PM
To: Hunt, Jennifer L (DOA)
Cc: Loepp, Victoria T (DOA); Castano, Alejandra; Benson, Gary A; Arthur, Gregory; AK, OPS
GC3&PCC OSM; Martin, Nelson D; AK, HSSEE Env Adv East; AK, OPS FS1 Facility OTL; AK,
OPS FSI OSM
Subject: Flaring Event a
To: Jennifer Hunt, AOGCC CC: Victoria Loepp, AOGCC
iennifer.hunt(oalaska.aov Victoria loepp(@alaska.Qov
From: Jennifer Blake, GPB Production Optimization Team Leader
A flaring event occurred at FS1 starting at 06/29/2015 22:15 and stopping at 06/30/2015 with a volume of 3429 (MSCF).
The event lasted for 105 minutes and was due to depressuring A and B gas trains and associated piping, including the 42"
Residue Gas line to CCP, in preparation for TAR shutdown. The event will stop when depressurization is completed.
A flaring event occurred at FS1 starting at 06/30/2015 00:01 and stopping at 06/30/2015 07:41 with a volume of
7882 (MSCF). The event lasted for 460 minutes. The event had a volume greater than 5000 (MSCF) and was
due to continued depressurization of the 42" gas line from FS 1 to CCP in preparation for TAR shutdown. The
event was stopped when depressurization was completed and the line was isolated.
Thanks,
Jennifer Blake
PCC/EOC Production Optimization Team Lead (alt David Spall)
Office (907) 659-4472
Cell (907) 830-6204
Jennifer.blake@bp.com
Hunt, Jennifer L (DOA)
From: AK, OPS PCC EOC TL <AKOPSPCCEOCTL@bp.com>
Sent: Sunday, July 05, 2015 4:27 PM
To: Hunt, Jennifer L (DOA)
Cc: Loepp, Victoria T (DOA); Castano, Alejandra; Benson, Gary A; Arthur, Gregory; AK, OPS
GC3&PCC OSM; Borton, Kim; AK, HSSEE Env Adv West; AK, OPS GC1 Facility OTL; AK,
OPS GC1 OSM
Subject: Flaring Event at
To: Jennifer Hunt, AOGCC CC: Victoria Loepp, AOGCC
Jennifer hunt(a)alaska.gov Victoria loepp(o alaska.gov
From: David Spall, GPB Production Optimization Team Leader
A flaring event occurred at GC1 starting at 06/30/2015 10:30 and stopping at 06/30/2015 13:00 with a volume of 680
(MSCF). The event lasted for 150 minutes and was due to De -pressuring G43 Flowline using test bank for maintenance.
The event stopped when the depressurization was complete and Flare valve was to the normal closed position.
A flaring event occurred at GC1 starting at 06/30/2015 12:15 and stopping at 06/30/2015 13:27 with a volume of 660
(MSCF). The event lasted for 72 minutes and was due to pigging Y -LCF. The event stopped when pigging was
completed.
A flaring event occurred at GC1 starting at 07/02/2015 16:43 and stopping at 07/02/2015 20:30 with a volume of 6670
(MSCF). The event lasted for 227 minutes. The event had a volume greater than 5000 (MSCF) The event was due to
work in a cabinet in skid 404 causing a high level alarm and Plant Shutdown, The event Stopped when rate was brought
back into the plant.
A flaring event occurred at GC1 starting at 07/03/2015 08:00 and stopping at 07/03/2015 12:00 with a volume of 2400
(MSCF). The event lasted for 240 minutes. The event was due to work in 404 skid wiring caused ESD of Plant. The vent
stopped when the problem was identified, stopped all work on wiring until TAR, and rate was brought back in to the plant
and flaring stopped.
Thanks
David Spall (Alternate —Jennifer Blake)
PCC/EOC Production Optimization Team Lead
907-659-4472 Office
219-689-4036 Cell
david.spall@bp.com
STATE OF ALASKA
ALASKA OIL AND GAS CONSERVATION COMMISSION
FACILITY REPORT OF PRODUCED GAS DISPOSITION
1. Facility Number
0290000031
2. Facility Name
PB GC 1
3. Field
PBU - WOA
4. Operator
BP
5. MonthNear of Disposition
I July -2015
Disposition
Volume MCF
20. Forproduction from multiple pools, list contribution of each pool as a percent of
Total Volume.
6. Sold
0
Pool Name Pool Code Percent
7. Reinjected
0
PRUDHOE 640150 98.80%
LISBURNE 640144 1.12%
8. Flared or vented 1 hour or less
0
MIDNIGHT SUN 640158 0.08%
PTMCINTYRE 640180 0.00%
9. Flared or vented more than 1 hour (see instr.)
20,770
10. Pilot and Purge
57,512
11, Assist Gas
0
12. Fuel gas used in lease operations.
667,248
13. Other (see instructions)
0
Official Use Only
Authorization>1 hr:
Safety
Z p �7-Q
MCF
14. TOTAL VOLUME (ITEMS 6.12)
745,530
Lease Use
MCF
15. NGL Gas Equivalent
0
Conservation
MCF
16. Purchased gas
0
Waste:
MCF
17. Transferred from:
0
--
18. Transferred to: (Express as a negative#) CGF
-64,290,989
Commissioner Date
19. Remarks:
I hereby certify that foregoing is true and correct to the best of my knowledge.
Note: All volumes must be corrected
Signature fes'/ tC Title Mana er Production Taxes and Royalties Alaska to pressure of 14.65 psia and to a
/ "7 temperature of 60o F. Authority 20
Printed Name Diane ColleyPhone (907) 564-5775 Date / / : AAC25.235.
VTC
Form 10422 Rev. 5/2009 INSTRUCTIONS ON REVERSE SIDE Submit in Duplicate
BP EXPLORATION (ALASKA) INC.
PRUDHOE BAY UNIT - GC -1
GAS FLARING INCIDENT REPORT
July 2015
Unplanned Events less than or equal to 1 hour
DATE TIME VOLUME DESCRIPTION OF INCIDENT & CAUSE ACTION TAKEN TO ELIMINATE CAUSE
Not required for unplanned events <= 1 hr Not required for unplanned events <= 1 hr
Page 7
TOTAL
0
Unplanned Events greater than 1 hour
DATE TIME
VOLUME DESCRIPTION OF INCIDENT & CAUSE
ACTION TAKEN TO ELIMINATE CAUSE
7/2/2015 1643-2030
6,670 See attachments
See attachments
7/3/2015 0800-1200
2,400
7/30-31/2015 1830-2400
11,700
TOTAL
20,770
Planned Events Less Than or Equal 1 Hour AND <= 5,000 mcf
DATE TIME
VOLUME DESCRIPTION OF INCIDENT & CAUSE
ACTION TAKEN TO ELIMINATE CAUSE
See attachments
See attachments
TOTAL
0
Events Exceeding 1 Hour OR >
See attachments
TOTAL 0
TOTAL
Unplanned Events < 1 Hour 0
Unplanned Events> 1 Hour 20,770
Planned Events < 1 hour and not 0
exceeding 5,000 MCF
Planned Events > 1 hour or 0
exceeding 5,000 MCF
Pilot Purge 57,512
Assist 0
TOTAL FLARED VOLUME 78,282
CAUSE
See attachments
8/16/2015
5:37 PM
Flare Start Date 07/01/2015
Flare End Date 07/31/2015
GC1 Flare Report Total Volume (MSCF) 20770
Report
Numbe System Date Start Time Stop Time Duration Intermittent Black Smoke Planned Reported By Volume
15-229 Controlled Slowdown 07/02/2015 4:43.00 pm 8:30:00 pm 227 min Yes No No BP1\SELFJR 6670
Determination Cause SID 404 CVH2 HILL WORKING IN CABINET SID PLANT DUE TO TOUCHING WRONG WIRE SKIMTANK HI LEVEL SID
Action Taken LOSS OF PRODUCTION RATE DYE TO PLANT SID /FLARE OFF GAS PLANT DUE TO LACK OF GAS RATE/ BRING IN RATE AND
15-231 Controlled Blowdown 07/03/2015 80000 am 12:00:00 pm 240 min No No No BP1\SELFJR 2400
Determination Cause S/DAND FLARING DUE TO WORK IN 404 SKID WIRING CAUSED ESD OF PLANT
Action Taken FOUND PROBLEM AND STOP ALL WORK ON ON WIRING UNTIL STARTED TAR PLANT BACK UP AND STOPPED FLARING
15-250 Controlled Blowdown 07/30/2015 6:30:00 pm 12:00:00 am 330 min Yes No No BPI\SELFJR 1380
Determination Cause IP compressor shut down because of a problem associated with cutting rate for plant shutdown tar.
Action Taken Plant rate is cut and ip gas comp is sId
15-251 Controlled Slowdown 07/31/2015 12:01.00 am 12:00:00 am 1439min Yes No No BP1\SELFJR 10320
Determination Cause Plant depressure for tat s/d
Action Taken Plant depressure for tat s/d
Total Volume (MSCF) 20770
Generated 08/04/2015 10:48:24AM Page 8 of 8
Hunt, Jennifer L (DOA)
From: AK, OPS PCC EOC TL <AKOPSPCCEOCTL@bp.com>
Sent: Sunday, July 05, 2015 4:27 PM
To: Hunt, Jennifer L (DOA)
Cc: Loepp, Victoria T (DOA); Castano, Alejandra; Benson, Gary A; Arthur, Gregory; AK, OPS
GC3&PCC OSM; Borton, Kim; AK, HSSEE Env Adv West; AK, OPS GC1 Facility OTL; AK,
OPS GCI OSM
Subject: Flaring Event at GC1
To: Jennifer Hunt, AOGCC CC: Victoria Loepp, AOGCC
aennifer.hunt( alaska.00v Victoria. loepp(o)alaska.gov
From: David Spall, GPB Production Optimization Team Leader
A flaring event occurred at GC1 starting at 06/30/2015 10:30 and stopping at 06/30/2015 13:00 with a volume of 680
(MSCF). The event lasted for 150 minutes and was due to De -pressuring G-43 Flowline using test bank for maintenance.
The event stopped when the depressurization was complete and Flare valve was to the normal closed position.
A flaring event occurred at GC1 starting at 06/30/2015 12:15 and stopping at 06/30/2015 13:27 with a volume of 660
(MSCF). The event lasted for 72 minutes and was due to pigging Y-LDF. The event stopped when pigging was
completed.
A flaring event occurred at GC1 starting at 07/02/2015 16:43 and stopping at 07/02/2015 20:30 with a volume of 6670
(MSCF). The event lasted for 227 minutes. The event had a volume greater than 5000 (MSCF) The event was due to
work in a cabinet in skid 404 causing a high level alarm and Plant Shutdown, The event Stopped when rate was brought
back into the plant.
A flaring event occurred at GC1 starting at 07/03/2015 08:00 and stopping at 07/03/2015 12:00 with a volume of 2400
(MSCF). The event lasted for 240 minutes. The event was due to work in 404 skid wiring caused ESD of Plant. The vent
stopped when the problem was identified, stopped all work on wiring until TAR, and rate was brought back in to the plant
and flaring stopped.
Thanks
David Spall (Alternate —Jennifer Blake)
PCC/EOC Production Optimization Team Lead
907-659-4472 Office
219-689-4036 Cell
david.spalW)bo.com
Hunt, Jennifer L (DOA)
From: AK, OPS PCC EOC TL <AKOPSPCCEOCTL@bp.com>
Sent: Sunday, August 09, 2015 12:28 PM
To: Hunt, Jennifer L (DOA)
Cc: Loepp, Victoria T (DOA); Castano, Alejandra; Benson, Gary A; Arthur, Gregory; AK, OPS
GC3&PCC OSM; Borton, Kim; AK, HSSEE Env Adv West; AK, OPS GCI Facility OTL; AK,
OPS GCI OSM
Subject: Flaring Event at GC1
To: Jennifer Hunt, AOGCC CC: Victoria Loepp, AOGCC
iennifer.hunt(aDalaska.cov Victoria. loepp(L alaska.gov
From: David Spall, GPB Production Optimization Team Leader
A flaring event occurred at GC1 starting at 07/30/2015 18:30 and stopping at 07/31/2015 with a volume of 1380 (MSCF).
The event lasted for 330 minutes and was due to IP compressor shut down because of a problem associated with cutting
rate for plant TAR shutdown. The event stopped when the Plant rate was cut and IP gas compressor was shutdown.
A flaring event occurred at GC1 starting at 07/31/2015 00:01 and stopping at 08/01/2015 24:00 with a volume of 10320
(MSCF). The event lasted for 1439 minutes and was due Plant de -pressure for TAR shutdown. The event stopped when
Plant de -pressure for TAR shutdown was completed.
Thanks
Dave
David Spall (Alternate —Jennifer Blake)
PCC/EOC Production Optimization Team Lead
907-659-4472 Office
219-689-4036 Cell
david.spall@bp.com
STATE OF ALASKA
ALASKA OIL AND GAS CONSERVATION COMMISSION
FACILITY REPORT OF PRODUCED GAS DISPOSITION
1. Facility Number
0290000031
2. Facility Name
PB GC 1
3. Field
PBU - WOA
4. Operator
BP
5. Month/Year of Disposition
August -2015
Disposition
Volume MCF
20. Forproduction from multiple pools, list contribution of each pool as a percent of
Total Volume.
6. Sold
0
Pool Name Pool Code Percent
7. Reinjected
0
PRUDHOE 640150 97.73%
LISBURNE 640144 2.19%
8. Flared or vented 1 hour or less
0
MIDNIGHTSUN 640158 0.08%
PT MCINTVRE 640180 0.00%
9. Flared or vented more than 1 hour (see insir.)
5,353
10. Pilot and Purge
5,832
11. Assist Gas
0
12. Fuel gas used in lease operations.
43,024
13. Other (see instructions)
0
Official Use Only
Authorization >7 hr:
Safety
MCF
14. TOTAL VOLUME (ITEMS 6-12)
54,209
Lease Use
MCF
15. NGL Gas Equivalent
0
Conservation
MCF
16. Purchased gas
0
Waste:
MCF
17. Transferred from:
0
7_+v
18. Transferred to: (Express as a negative #) CGF
-1,958,765
Commissioner Date
19. Remarks:
I hereby certify that the foregoing is true and correct to the best of my knowledge.
ad;ri///��,� pA,�%�
Signature �'�C.ts"�V Title Mana er Production Taxes and Royalties Alaska
Note: All volumes must be corrected
to pressure Of 14.65 Asia and to a
temperature of 60o F. Authority 20
AAC25.235.
Printed Name Diane Colley Phone (907) 564-5775 Date /
VTL-
Form 10422 Rev. 5/2009 INSTRUCTIONS ON REVERSE SIDE Submit in Duplicate
BP EXPLORATION (ALASKA( INC.
PRUDHOE BAY UNIT- GC -1
GAS FLARING INCIDENT REPORT
August 2015
Page 8
Unplanned Events less than or equal to 1 hour 1
DATE TIME VOLUME DESCRIPTION OF INCIDENT & CAUSE ACTION TAKEN TO ELIMINATE CAUSE
Not required for unplanned events <= 1 hr Not required for unplanned events <= 1 hr
TOTAL 0
DATE
TIME
VOLUME DESCRIPTION OF INCIDENT & CAUSE
ACTION TAKEN TO ELIMINATE CAU5E
8/30-31/2015
1600-1001
5,353 See attachments
See attachments
TOTAL
5,353
Planned Events Less Than or Equal 1 Hour AND <= 5,000 mcf
DATE
TIME
VOLUME DESCRIPTION OF INCIDENT & CAUSE
ACTION TAKEN TO ELIMINATE CAUSE
See attachments
See attachments
TOTAL
0
TOTAL
Unplanned Events < 1 Hour
Unplanned Events> 1 Hour
Planned Events < 1 hour and not
exceeding 5,000 MCF
Planned Events > 1 hour or
exceeding 5,000 MCF
Pilot Purge
Assist
TOTAL FLARED VOLUME
VOLUME DESCRIPTION OF INCIDENT
See attachments
0
TOTAL
0
5,353
0
0
5,832
0
11,185
See attachments
9/11/2015
10:38 AM
Flare Start Date 08/01/2015
Flare End Date 08/31/2015
Total Volume (MSCF) 5353
Generated 09/02/2015 9:47:02AM Page 8 of 10
GCI Flare Report
Total Volume (MSCF)
5353
Report
Numbs System
Date Start Time Stop Time Duration Intermittent Black Smoke
Planned Reported By
Volume
15-289 Flare Relief 08/30/2015 4:00:00 pm 11:59:OOpm 479min No Yes
No BPI\SHELTI
116
Determination Cause
Plant start up, black smoke periodically. On LP flares 3 8 4.
Action Taken
Expect black smoke to stop once LP compressors are repaired and oil rate is much higher.
Daily Volume (MSCF)
116
15-292 Flare Relief 08/31/2015 12:01:00 am 10:01:00 am 600 min No Yes
No BPI\SHELTI
5237
Determination Cause
Plant startup, black smoke periodically. On LP flares 384.
Action Taken
LP Compressor is running normal at 10:01
Daily Volume (MSCF)
5237
Total Volume (MSCF) 5353
Generated 09/02/2015 9:47:02AM Page 8 of 10
STATE OF ALASKA
ALASKA OIL AND GAS CONSERVATION COMMISSION
FACILITY REPORT OF PRODUCED GAS DISPOSITION
1. Facility Number2.
0290000031
Facility Name
PBU GC 1
3, Field
PBU - WOA
4. Operator
BP
5. Month/Year of Disposition
Se tember-2015
Disposition
Volume MCF
20. For production from multiple pools, list contribution of each pool as a percent of
Total Volume.
6. Sold
0
Pool Name Pool Code Percent
7. Reinjected
0
PRUDHOE 640150 98.22%
LISBURNE 640144 1.53
8. Flared or vented 1 hour or less
1,730
MIDNIGHT SUN 640158 0.25%
PT MCINTYRE 640180 0.00%
9. Flared or vented more than 1 hour (see instr.)
1,200
10. Pilot and Purge
55,614
11. Assist Gas
0
12. Fuel gas used in lease operations.
589,166
13. Other (see instructions)
0
Of del Use Only
Authorization >t he
Safety
/Z G O
MCF
14. TOTAL VOLUME (ITEMS 6-12)
647,710
Lease Use
MCF
15. NGL Gas Equivalent
0
Conservation
MCF
16, Purchased gas
0
Waste:
MCF
17. Transferred from:
0
18. Transferred to: (Express as a negative #) CGF
-52,634,780
Commissioner Date
19. Remarks:
I hereby certify that the foregoing is true and correct to the best of my knowledge.
�/M�^
W
Signature '/ K- Title Manager Production Taxes and Royalties Alaska
Note: All volumes must be corrected
to pressure of 14.65 psia and to a
temperature of 60o F. Authority 20
AAC25.235.
Printed Name Diane Colley Phone (907) 564-5775 Dalelbljvl,�-
V'T L-
/o12�ilrS
Form 10-422 Rev. 5/2009 INSTRUCTIONS ON REVERSE SIDE Submit in Duplicate
BP EXPLORATION (ALASKA) INC.
PRUDHOE BAY UNIT - GC -1
GAS FLARING INCIDENT REPORT
September 2015
9/6/2015 0340-0344 180 Not required for unplanned events <= 1 hr
9/24/2015 1800-1810 1,260
TOTAL 1,440
Not required for unplanned events <= 1 hr
Page 7
9/2/2015
1720-2300
1,000 See attachments
See attachments
9/30/2015
1645-2300
200
TOTAL
1,200
Planned Events Less Than or Equal 1 Hour AND <= 5,000 mcf
DATE
TIME
VOLUME DESCRIPTION OF INCIDENT & CAUSE
ACTION TAKEN TO ELIMINATE CAUSE
9/12/2015
1736-1742
30 See attachments
See attachments
9/12/2015
2028-2315
260
TOTAL
290
TOTAL
Unplanned Events < 1 Hour
Unplanned Events > 1 Hour
Planned Events < 1 hour and not
exceeding 5,000 MCF
Planned Events > 1 hour or
exceeding 5,000 MCF
Pilot Purge
Assist
TOTAL FLARED VOLUME
G
TOTAL
1,440
1,200
290
9
55,614
0
58,544
See attachments
See attachments
10/15/2015
10:43 AM
Flare StartDate 09/01/2015
Flare End Date 09/30/2015
GCI Flare Report
Total Volume (MSCF) 2930
Report
Numbe System Date Start Time Stop Time Duration Intermittent Black Smoke Planned Reported By Volume
15-296 Flare Relief 09/02/2015 5:20:00 pm 11:00:00 pm 340 min Yes No No BP1\FUELMO 1000
Determination Cause Pump station 1 SDV went closed causing production to be cut from GC -1. Low gas rate causing Flare valve to open off of V-136
Action Taken Pump station 1 SDV back open and rates brought back into the facility. Flaring off of V-136 stopped.
Daily Volume (MSCF) 1000
15-306 Flare Relief 09/12/2015 5:36:00 pm 5:42:00 pm 6 min No
Determination Cause 1-12o Wash K-7000 (spin w/ coppus)
Action Taken wash done
15-306 Flare Relief 09/12/2015 8:28:00 pm 11:15:00 pm 167 min Yes
Determination Cause Multiple K-7000 starts
Action Taken done
No
No Yes BP1\SPRINGG 260
15-320 Flare Relief 09/30/2015 4:45:00 pm 11:00:00 pm 375 min No No
Determination Cause Depressured E-44 for freeze protect Depressured F-47,48 for safe out.
Action Taken flow lines are depressured
Generated 10/02/2015 2:48:30PM
Daily Volume (MSCF) 290
Daily Volume (MSCF) 200
Total Volume (MSCF) 2930
Page 6 of 8
STATE OF ALASKA
ALASKA OIL AND GAS CONSERVATION COMMISSION
FACILITY REPORT OF PRODUCED GAS DISPOSITION
1. Facility Number
0290000031
2. Facility Name
PBU GC 1
3. Field
PBU - WOA
4. Operator
BP
5. MonthNear of Disposition
I October -2015
Disposition
Volume MCF
20. For production from multiple pools, list contribution of each pool as a percent of
Total Volume.
6. Sold
0
Pool Name Pool Code Percent
7. Reinjected
O
PRUDHOE 640150 98.767
LISBURNE 640144 0.98%
8. Flared or vented 1 hour or less
4,200
'
MIDNIGHTSUN 640158 0.26%
PT MCINTYRE 640180 0.00%
9. Flared or vented more than 1 hour (see instr.)
1,550
10. Pilot and Purge
58,792
-
11. Assist Gas
0
-
12. Fuel gas used in lease operations.
743,382
13. Other (see instructions)
0
Official Use Only
Authorization >1 hr:
Safety
�5-5D
MCF
14. TOTAL VOLUME (ITEMS 6-12)
807,924
Lease Use
MCF
15. NGL Gas Equivalent
0
Conservation
MCF
16. Purchased gas
0
Waste:
MCF
17. Transferred from:
0
.
18. Transferred to: (Express as a negative #) CGF
-68,434,967
Commissioner Date
19. Remarks:
I hereby certify that the foregoing is true and correct to the best of my knowledge.
�
Signature GCIf /l. Title Manager Production Taxes and R ote: All volumes must be corrected
LOAN
allies Alaska to pressure of 14.65 psis and to a
{�L,./ temperature of 60o F. Authority 20
Printed Name Diane Colley Phone (907) 564-5775 Date 1/hi / jt I AAC25.235.
V-TL-
2-) 151'5 -
Form 10-422 Rev. 512009 INSTRUCTIONS ON REVERSE SIDE Submit in Duplicate
BP EXPLORATION (ALASKA) INC.
PRUDHOE BAY UNIT - GC -1
GAS FLARING INCIDENT REPORT
October 2015
Unplanned Events less than or equal to 1 hour
DATE TIME VOLUME DESCRIPTION OF INCIDENT & CAUSE ACTION TAKEN TO ELIMINATE CAUSE
10/17/2015 1351-1355 4,200 Not required for unplanned events <= 1 hr Not required for unplanned events <= 1 hr
TOTAL 4,200
Unplanned Events greater than 1 hour
DESCRIPTIONUAII; TIME VOLUME OF INCIDENT &CAUSE ACTION TAKEN TO ELIMINATE CAUSE
See attachments See attachments
TOTAL 0
Planned Events Less Than or Equal 1 Hour AND <= 5,000 mcf
DATE TIME VOLUME DESCRIPTION OF INCIDENT & CAUSE ACTION TAKEN TO ELIMINATE CAUSE
See attachments See attachments
TOTAL 0
DATE
10/15/2015
0809-1004
TOTAL
Unplanned Events <1 Hour
Unplanned Events> 1 Hour
Planned Events < 1 hour and not
exceeding 5,000 MCF
Planned Events > 1 hour or
exceeding 5,000 MCF
Pilot Purge
Assist
TOTAL FLARED VOLUME
VOLUME DESCRIPTION OF I Ni
1,550 See attachments
1,550
TOTAL
4,200
0
0
1,550
55,792
0
64,542
ACTION TAKEN TO ELIMINATE CAUSE
See attachments
Page 9
11/16/2015
3:35 PM
FlareStartDate 10/01/2015
Flare End Date 10/31/2015
GC1 Flare Report
Total Volume (MSCF)
5750
Report
Numbe System
Date Start Time
Stop Time Duration Intermittent
Black Smoke Planned Reported By
Volume
15-338 Flare Relief
10/15/2015 8:09:00am
10:04:00 am 115 min No
Yes Yes BP1SPRINGG
1550
Determination Cause K-1058
K-108 down for sk-21 air dryer electrical tie-ins
Action Taken tie-ins
completed
Daily Volume (MSCF)
1550
Total Volume (MSCF)
5750
Generated 11/06/2015 3:25:34PM Page 11 of 12
11/25/2015
RE: Flaring Event at GC1- Enterprise Vault Archived Item
From AK, OPS PCC EOC TL Date 10/16/2015, 2:23:47 PM
To AOGCC Reporting (DOA sponsored)
Cc Loepp, Victoria T (DOA); Benson, Gary A; Arthur, Gregory; AK, OPS GC3&PCC OSM; Borton, Kim; AK,
HSSEE Env Adv West; AK, OPS GCS Facility OTL; AK, OPS GC1OSM; Glover, Robin (SLR)
Subject RE: Flaring Event at GC1
To: Jennifer Hunt, AOGCC CC: Victoria Loepp, AOGCC
0ennifer hunt &alaska.00v Victoria.loeimealaska.00v
From: Jennifer Blake, GPB Production Optimization Team Leader
My apologies for the resend, however the first report received an "undeliverable" notice from the AOGCC
Reporting email recipient.
A flaring event occurred at GC1 starting at 10/15/2015 08:09 and stopping at 10/15/2015 10:04 with a volume of
1550 (MSCF). The event was a black smoke event. The event lasted for 115 minutes and was due to K-105 and
K-108 being down for Skid 21 air dryer electrical tie-ins. The event stopped when the tie-ins were completed.
Thanks
Jennifer Blake
PCC/EOC Production Optimization Team Lead (alt David Spall)
Office (907) 659-4472
Cell (907) 830-6204
Jennifer blake@bo.com
haps J/amwo2.soa.alaska.gm/Enterpri seVauitMewM essage.asp?Vaultld=1870AD EC3E050i E4ABOD8874B7C F6EOBA1110000jnuwO2&Savesetld=20151118... 111
STATE OF ALASKA
ALASKA OIL AND GAS CONSERVATION COMMISSION
FACILITY REPORT OF PRODUCED GAS DISPOSITION
1. Facility Number
0290000031
2. Facility Name
PBU GC 1
3. Field
PBU - WOA
4. Operator
BP
5. MonthlYear of Disposition
1 November -2015
Disposition
Volume MCF
20. Forproduction from multiple pools, list contribution of each pool as a percent of
Total Volume.
6. Sold
0
Pool Name Pool Code Percent
7. Reinjected
O
PRUDHOE 640150 99.93°/
LISBURNE 640144 0.00%
8. Flared or vented 1 hour or lass
8,333
MIDNIGHT SUN 640158 0.07%
PTMCINTYRE 640180 0.00%
9. Flared or vented more than 1 hour (see instr.)
4,520
10. Pilot and Purge
55,695
11, Assist Gas
0
12. Fuel gas used in lease operations.
729,391
13. Other (see instructions)
0
Official Use Only
Authorization >7 hr:
Safety
5333
MCF
14. TOTAL VOLUME (ITEMS 6-12)
797,939
Lease Use
MCF
15. NGL Gas Equivalent
0
Conservation
MCF
16. Purchased gas
Waste:
MCF
17. Transferred from:
0149—//.
_! _, /
le b
Coissioner Date
18. Transferred to: (Express as a negative #) CGF
-67,462,861
19. Remarks:
I hereby certify that the foregoing is true and correct to the best of my knowledge.
®(�IyIA/l�n Note: All volumes must be corrected
Signature (iGGUU�� �fC C ! Title Manager Production Taxes and Royalties Alaska to pressure of 14.65 psis and to a
temperature of 60o F. Authority 20
Printed Name Diane Colley Phone (907) 564-5775 Date 14.1 / AAC25.235.
Form 10-422 Rev. 512009 INSTRUCTIONS ON REVERSE SIDE Submit in Duplicate
11/18/2015 0500-0530
TOTAL
BP EXPLORATION (ALASKA) INC.
PRUDHOE BAY UNIT- GC -1
GAS FLARING INCIDENT REPORT
November 2015
8,333 Not required for unplanned events <= 1 hr
8,333
Not required for unplanned events <= 1 hr
11/6/2015 1400-1521 50 See attachments See attachments
11/12/2015 1520-1720 4,470
TOTAL 4,520
Planned Events Less Than or Equal 1 Hour AND <= 5,000 mcf
DATE TIME VOLUME DESCRIPTION OF INCIDENT & CAUSE ACTION TAKEN TO ELIMINATE CAUSE
See attachments See attachments
TOTAL 0
Planned Events Exceeding 1 Hour OR > 5,000 mcf
DATE TIME VOLUME DESCRIPTION OF INCIDENT & CAUSE ACTION TAKEN TO ELIMINATE CAUSE
See attachments See attachments
TOTAL 0
Unplanned Events < 1 Hour
Unplanned Events> 1 Hour
Planned Events < 1 hour and not
exceeding 5,000 MCF
Planned Events> 1 hour or
exceeding 5,000 MCF
Pilot Purge
Assist
TOTAL FLARED VOLUME
TOTAL
8,333
4,520
0
0
55,695
0
68,548
Page 6
12/15/2015
9:52 AM
Flare StartDate 11/01/2015
Flare End Date 11/30/2015
GC1 Flare Report Total Volume (MSCF) 12853
Report
Numbs System Date Start Time Stop Time Duration Intermittent Black Smoke Planned Reported By Volume
15-375 Flare Relief 11/06/2015 2:00:00 pm 3:21:00 pm 81 min No No No BP1\KIRSCHW 50
Determination Cause startup GLT3200
Action Taken started up offline GILT machine
Daily Volume (MSCF) 50
15-380 Flare Relief 11/12/2015 3:20:00 pm 5:20:00 pm 120 min No No No BP1\BROWNK 4470
Determination Cause Flared off of V-136 due to Ethernet drop controller malfunction inPWX bringing in a stop production.
Action Taken Geared stop production and brought gas rates back in
Daily Volume (MSCF) 4470
Total Volume (MSCF) 12853
Generated 12/03/2015 4:18:41 PM Page 5 of 7
11/20/2015
Flaring Event at GC1
Flaring Event at GC1
AK, OPS PCC EOC TL [AKOPSPCCEOCTL@bp.com]
Sent:Sunday, November 08, 2015 7:04 PM
To: AOGCC Reporting (DOA sponsored)
Cc: Loepp, Victoria T (DOA); Benson, Gary A [Gary.Benson@bp.com]; Arthur, Gregory [Gregory Arthur@bp.com]; AK, OPS GC3&PCC
OSM [AKOPSGC3PCCOSM@BP.com]; Borton, Kim [Kim.Borton@bp.com]; AK, HSSEE Env Adv West
[AKHSSEEEnvAdvWest@bp.com]; AK, OPS GC1 Facility OTL [AKOPSGC1FacilityOTL@bp.com]; AK, OPS GCI OSM
[AKOPSGCIOSM@bp.com]; Glover, Robin (SLR) [Robin.Glover@bp.com]
To: AOGCC Reporting CC: Victoria Loepp, AOGCC
Aoccc.reportino Walaska.00v Victoria.loeop@alaska.gov
From: Jennifer Blake, GPB Production Optimization Team Leader
A flaring event occurred at GC1 starting at 11/06/2015 14:00 and stopping at 11/06/2015 15:21 with a volume of 50
(MSCF). The event lasted for 81 minutes and was due to startup of GILT Compressor 3200. The event stopped when
startup was complete.
Thanks
Jennifer Blake
PCC/EOC Production Optimization Team Lead (alt David Spall)
Office (907) 659-4472
Cell (907) 830-6204
Jennifer.blake@bp.com
haps://webmaila.alaska.gov/owa/?ae=Item&t=IPM.Note&id=RgAAAABKLne2zgP4SoM kep0hCxbSBwBUvQ964rjQTgYgn3632GdIAAAAhhLyAABUvQ964rjQT... 1/1
11/20/2015
Flaring Event at GC1
Flaring Event at GC1
AK, OPS PCC EOC TL [AKOPSPCCEOCTL@bp.com]
Sent:Saturday, November 14, 2015 4:39 PM
To: AOGCC Reporting (DOA sponsored)
Cc: Loepp, Victoria T (DOA); Benson, Gary A [Gary.Benson@bp.com]; Arthur, Gregory [Gregory.Arthur@bp.com]; AK, OPS GC3&PCC
OSM [AKOPSGC3PCCOSM@BP.com]; Borton, Kim [Kim.Borton@bp.com]; AK, HSSEE Env Adv West
[AKHSSEEEnvAdvWest@bp.com]; AK, OPS GCI Facility OTL [AK0PSGC1Facility0TL@bp.com]; AK, OPS GC1 OSM
[AKOPSGC10SM@bp.com]; Glover, Robin (SLR) [Robin.Glover@bp.com]
To: AOGCC Reporting CC: Victoria Loepp, AOGCC
Aoacc.reportino analaska.00v Victoda.loepp(aDalaska.gov
From: Jennifer Blake, GPB Production Optimization Team Leader
A flaring event occurred at GC1 starting at 11/12/2015 15:20 and stopping at 11/12/2015 17:20 with a volume of
4470 (MSCF). The event lasted for 120 minutes and was due to a controls issue in the Produced Water section of
the plant resulting in a stop production and associated flaring. The event stopped when the stop production was
cleared and the facility was brought back up.
Thanks
Jennifer Blake
PCC/EOC Production Optimization Team Lead (alt David Spall)
Office (907) 659-4472
Cell (907) 830-6204
Jennifer.blake@bp.com
https://webmaila.alaska.gov/oval?ae=Item&t=IPM.Note&id=RgAAAABKLne2zgP4SoM kepGhCxl3SBwBUvQ964rjQTgYgn3632GdIAAAAhhLyAABUvQ9&kjQT... 1/1
11/30/2015
Flaring Event at GC1
Flaring Event at GCI
AK, OPS PCC EOC TL [AKOPSPCCEOCTL@bp.com]
Sent:Tuesday, November 24, 2015 3:59 PM
To: AOGCC Reporting (DOA sponsored)
Cc: Loepp, Victoria T (DOA); Benson, Gary A [Gary.Benson@bp.com]; Arthur, Gregory [Gregory.Arthur@bp.com]; AK, OPS GC3&PCC
OSM [AKOPSGC3PCCOSM@BP.com]; Borton, Kim [Kim.Borton@bp.com]; AK, HSSEE Env Adv West
[AKHSSEEEnvAdvWest@bp.com]; AK, OPS GCS Facility OTL [AK0PSGC1Fadlity0TL@bp.com]; AK, OPS GCI OSM
[AKOPSGCIOSM@bp.com]; Glover, Robin (SLR) [Robin.Glover@bp.com]
To: AOGCC Reporting CC: Victoria Loepp, AOGCC
Aoacc.reoortingaa alaska.00v Victoria.loeooCa)alaska.gov
From: David Spall, GPB Production Optimization Team Leader
A flaring event occurred at GC1 starting at 11/18/2015 05:00 and stopping at 11/18/2015 05:30 with a volume of
8333 (MSCF). The event lasted for 30 minutes and was due to CGF lost tandem compressors. The event stopped
when CGF brought tandem compressors back up, We choked back and SI wells to lower the Transit pressure..
Thanks
David Spall (Alternate—Jennifer Blake)
PCC/EOC Production Optimization Team Lead
907-659-4472 Office
219-689-4036 Cell
david.soall@bo.com
https://webm ai la.al aska.gov/owa/?ae=Item &t=1PM.N ote&id=RgAAAABKLne2zgP4SoM kepOhCxbSBwBUvQ964rjQTgYgn3632GdIAAAAhhLyAABU vQ964rj QT... 1/1
STATE OF ALASKA
ALASKA OIL AND GAS CONSERVATION COMMISSION
FACILITY REPORT OF PRODUCED GAS DISPOSITION
1. Facility Number
0290000031
2. Facility Name
PBU GC 1
3. Field
PBU - WOA
4. Operator
8P
5. MonlhlYear of Disposition
December -2015
Disposition
Volume MCF
20. For production Imm multiple pools, list contribution of each pool as a percent of
Total Volume -
6.
s. sold
Pool Name Pool Code Percent
7. Reinjected0
PRUDHOE 640150 99.95%
LISBURNE 640144 0.00%
8. Flared or vented 1 hour or less
183
MIDNIGHTSUN 640158 0.05%
PT MCINTYRE 640180 0.00%
9. Flared or vented more than 1 hour (see inslr.)
4,845
10. Pilot and Purge
57,519
11. Assist Gas
0
12. Fuel gas used in lease operations.
803,125
13. Other (see instructions)
Q
Oficial Use Only
Authorization >t hr:
Safety
Q
�U ¢5
MCF
14. TOTAL VOLUME (ITEMS 6-12)
865,672
Lease Use
MCF
15. NGL Gas Equivalent
Q
Conservation
MCF
16. Purchased gas
Q
Waste:
MCF
17. Transferred from
0
18. Transferred to: (Express as a negative #) CGF
-70,371,880
Coehmissioner Date
19. Remarks:
I hereby certify that the foregoing is we and correct to the best of my know ge.
Note: All volumes must be corrected
Signatur _ Title Mana er Production Taxes and Rovaltres Alaska I to pressure of 14.65 Asia and to a
v I temperature of 600 F. Authority 20
Printed Name Diane Colley Phone (907) 5645775 Date I 6 { �j AAC25.235.
VT L
Form 10422 Rev. 512009 INSTRUCTIONS ON REVERSE SIDE Submit in Duplicate
BP EXPLORATION (ALASKA) INC.
PRUDHOE BAY UNIT - GC -1
GAS FLARING INCIDENT REPORT
December 2015
Unplanned Events less than or equal to 1 hour
DATE TIME VOLUME DESCRIPTION OF INCIDENT & CAUSE ACTION TAKEN TO ELIMINATE CAUSE
12/6/2015 1417-1421 3 Not required for unplanned events <= 1 hr Not required for unplanned events <= 1 hr
12/6/2015 2012-2046 14
12/11/2015 1221-1226 34
TOTAL 51
Page 1
Unplanned Events greater than 1 hour
DATE
TIME
VOLUME DESCRIPTION OF INCIDENT & CAUSE ACTION TAKEN TO ELIMINATE CAUSE
12/6/2015
1817-2350
370 See attachments See attachments
12/7/2015
0002-0633
490
12/7/2015
0025-0149
63
12/8/2015
1649-2352
140
12/9-10/2015
0000-2400
1,597
12/11/2015
0018-1218
1,990
12/13/2015
0000-2400
195
TOTAL
4,845
Planned Events Less Than or Equal 1 Hour AND <= 5,000 mcf
DATE TIME VOLUME DESCRIPTION OF INCIDENT & CAUSE ACTION TAKEN TO ELIMINATE CAUSE
12/15/2015 1300-1315 99 See attachments See attachments
12/15/2015 2110-2117 33
TOTAL 132
TOTAL
N
See attachments
See attachments
1/28/2016
220 PM
BP EXPLORATION (ALASKA) INC.
PRUDHOE BAY UNIT -GC -1
GAS FLARING INCIDENT REPORT
December 2015
Page 2
1/28/2016
2:20 PM
TOTAL
Unplanned Events < 1 Hour
51
Unplanned Events> 1 Hour
41845
Planned Events < 1 hour and not
132
exceeding 5,000 MCF
Planned Events> 1 hour or
0
exceeding 5,000 MCF
Pilot Purge
57,519
Assist
0
TOTAL FLARED VOLUME
62,547
Page 2
1/28/2016
2:20 PM
FlareStartDate 12/01/2015
Flare End Date 12/31/2015
GC1 Flare Report Total Volume (MSCF) 5028
Report
Numbs System Date Start Time Stop Time Duration Intermittent Black Smoke Planned Reported By Volume
15-397 Flare Relief 12/06/2015 6:17:00 pm 11:50:00 pm 333 min Yes No No BP1 VONESCC 370
Determination Cause V-136 Flare Valve PIC -0402 Open due to swings in the production rates from Annex into D -Bank. EST -9912B flow limited due to fouling.
Action Taken Lowered TEG circulation rate from 92 gpm to 85 gpm
15-398 Flare Relief 12/07/2015 12:02:00 am 6:33:00 am 391 min Yes No No 8PIUONESCC 490
Determination Cause V-136 Flare Valve PIC -0402 Open due to swings in the production rates from Annex into D -Bank. EST -9912B flow limited due to fouling.
Action Taken Lowered Annex TEG circulation rate from 92 gpm to 85 gpm to stabilize swings through reboiler.
15-398 Flare Relief 12/07/2015 1225:00 am 1:49:00 am 84 min Yes No No BPI\LOTTTO 63
Determination Cause LP gas rate to Gas Plant swinging due to upset Annex Reboiler from Well/Flowline unloading.
Action Taken Well/Flowline unleaded.
15-399 Flare Relief 12/08/2015 4:49:00 pm 11:52:00 pm 423 min Yes No No BP1\JONESCC 140
Determination Cause V-136 Flare Valve PIC -0402 Open 0.14 hour (intermittent open over 423 minute expanse of time)- Unknown cause.
Action Taken No trending cause detected to remedy
15400 Flare Relief 12/09/2015 12:00:00 am 12:00:00 am 1440 min Yes No
Determination Cause V-136 Flare Valve PIC -0402 Open due to swings in the IP suction pressure.
Action Taken No problem found.
15-404 Flare Relief 12/10/2015 12:00:00 am 12:00:00 am 1440 min Yes No
Determination Cause V-136 Flare Valve PIC -0402 Open due to swings in IP suction pressure.
Action Taken No problem diagnosed.
15-406 Flare Relief 12/11/2015 12:18:00 am 12:18:00 pm 720 min Yes No
Determination Cause V-136 Flare Valve PIC -0402 Open due to K-108 anti -surge FV -431 failure.
Action Taken Swapped IP Compressors to work on FV -431.
No BP1\SPRINGG 442
No BP7\SPRINGG 1155
No BPWONESCC 1990
15-407 Flare Relief 12/13/2015 12:00:00 am 12:00:00 am 1440 min Yes No No BP1\SPRINGG 195
Determination Cause V-136 Flare Valve PIC -0402 Open due the LP 81P compressor designs are no longer adequate for current process conditions.
Generated 01/08/2016 11:15:02AM Page 5 of 7
Flare Start Date 12/01/2015
Flare End Date 12/31/2015
Action Taken Swapped IP Compressors to work on FV -4311.
15409 Controlled Slowdown 12/15/2015 1:00:00 pm 1:15:00 pm 15 min No No Yes BPIISPRINGG
Determination Cause S/D GLT3200 after issue with little alica resolved
Action Taken NO response taken as this was deemed to be of start duration.
15409 Controlled Slowdown 12/15/2015 9:10:00 pm 9:17:00 pm 7 min No No Yes BPI\SPRINGG
Determination Cause Depressured G45 through T -bank to freeze protect for F rank
Action Taken No response taken as this was deemed to be of short duration.
99
33
Total Volume (MSCF) 5028
Generated 01/08/2016 11:15:02AM Page 6 of 7
12/14/2015
Flaring Event at GC1
Flaring Event at GC1
AK, OPS PCC EOC TL [AK0PSPCCE0CTL@bp.00M1
sent:Sunday, December 13, 2015 1:04 PM
To: AOGCC Reporting (DOA sponsored)
Cc: Loepp, Victoria T (DOA); Benson, Gary A [Gary.Benson@bp.com]; Arthur, Gregory [Gregory.Arthur@bp.com]; AK, OPS GC3&PCC
OSM [AKOPSGC3PCCOSM@BP.com]; Barton, Kim [Kim.Borton@bp.com]; AK, HSSEE Env Adv West
[AKHSSEEEnvAdvWest@bp.com]; AK, OPS GC1 Facility OTL (AKOPSGC1FacilityOTL@bp.com]; AK, OPS GCI OSM
[AKOPSGCIOSM@bp.com]; Glover, Robin (SLR) [Robin.Glover@bp.com]; Kain, Rachel B [Rachel.Kain@bp.com]
To: AOGCC Reporting CC: Victoria Loepp, AOGCC
Aoacc reoorting@alaska gov Victoria Ioeoo(d)alaska.gov
From: Jennifer Blake, GPB Production Optimization Team Leader
A flaring event occurred at GC1 starting at 12/06/2015 18:17 and stopping at 12/06/2015 23:50 with a volume of 370
(MSCF). The event was intermittent over the duration of 333 minutes and was due to swings in the production rates
from the Annex into D Bank bumping the flow limit of the heat exchanger. The event stopped when the TEG
circulation rate was lowered. The flare was only open for 0.37 hours over the duration of the flaring event.
A flaring event occurred at GCI starting at 12/07/2015 00:02 and stopping at 12/07/2015 06:33 with a volume of 490
(MSCF). The event was intermittent over the duration of 391 minutes and was due to swings in the production rates
from the Annex into D Bank bumping the flow limit of the heat exchanger. The event stopped when the TEG
circulation rate was lowered. The flare was only open for 0.49 hours over the duration of the flaring event.
A flaring event occurred at GC1 starting at 12/08/2015 16:49 and stopping at 12/08/2015 23:52 with a volume of 140
(MSCF). The event was intermittent over the duration of 423 minutes and was due to an unknown cause. The flaring
event self -corrected and the valve to the flare was only open for 0.14 hours over the duration of the flaring event.
A flaring event occurred at GC1 starting at 12/09/2015 00:00 and stopping at 12/10/2015 with a volume of 442
(MSCF). The event was intermittent over the duration of 1440 minutes and was due to V-136 flare valve opening due
to swings in the IP suction pressure. No problem was found causing the IP suction pressure swing. The valve to
flare was only open for 1.18 hours over the duration of the flaring event
A flaring event occurred at GC1 starting at 12/10/2015 00:00 and stopping at 12/11/2015 with a volume of 1155
(MSCF). The event was intermittent over the duration of 1440 minutes and was due to V-136 flare valve opening due
to swings in the IP suction pressure. No problem was found causing the IP suction pressure swing. The valve to
flare was only open for 3.08 hours over the duration of the flaring event.
A flaring event occurred at GC1 starting at 12/11/2015 00:18 and stopping at 12/11/2015 12:18 with a volume of
1990 (MSCF). The event lasted for 720 minutes and was due to V-136 flare valve opening as a result of the K-108
compressor anti surge valve failure. The event stopped when the IP Compressors were swapped to work on the
anti -surge valve. The flare was only open for 1.99 hours over the duration of the flaring event.
Work orders were written to determine and fix the cause of the unknown flare events.
Thanks,
Jennifer Blake
PCC/EOC Production Optimization Team Lead (alt David Spall)
Office (907) 659-4472
Cell (907) 830-6204
Jennifer.blake@bp.com
https:llwebmai la.alaska.gavlowal?ae=Item &t=IPM.N ote&id=RgAAAABKLne2zgP4SoM kepOhCxbSBwBUvQ964rjQTgygn3632GdIAAAAhhLyAABUvQ964rjQT... 1/2
12/30/2015
Flaring Event at GC1
Flaring Event at GC1
AK, OPS PCC EOC TL [AKOPSPCCEOCTL@bp.COM1
Sent:Friday, December 18, 2015 3:27 PM
To: AOGCC Reporting (DOA sponsored)
SIo]n,vv@bp.com]; AK, OPS GC3&PCC
OM [AKOPSGC3PCCOSM@BP.com; BortoKim [Kim.Borton@bp.com], AK, HSSEE EnAdv
[AKHSSEEEnvAdvWest@bp.com]; AK, OPS GC1 Facility OTL [AKOPSGC1FacilityOTL@bp.com]; AK, OPS GC1 OSM
[AKOPSGC10SM@bp.com]; Glover, Robin (SLR) [Robin.Glover@bp.com]; Kain, Rachel B [Rachel.Kain@bp.com]
To: AOGCC Reporting CC: Victoria Loepp, AOGCC
Aoocc reporting@alaska Qov Victoria IoeppCc)alaska.gov
From: Jennifer Blake, GPB Production Optimization Team Leader
A flaring event occurred at GC1 starting at 12/13/2015 00:00 and stopping at 12/14/2015 with a volume of
195 (MSCF). The event lasted for 1440 minutes. The event was intermittent over the duration of 1440 minutes.
The flaring event was caused by the V-136 Flare Valve opening intermittently due to process conditions. The flare
valve was only open for 0.52 hours over the duration of the flaring event. The event stopped when the IP
compressors were swapped.
This flaring event is related to the flaring events earlier in the week. Work orders were written to determine and fix
the cause of the unknown flare events.
Thanks,
Jennifer Blake
PCC/ECC Production Optimization Team Lead (alt David Spall)
Office (907) 659-4472
Cell (907) 830-6204
Jennifer.blake@bp.com
https:l/webmaila.alaska.gov/awa/?ae=ltem &t= IPM.Note&id= RgAAAABKLne2zgP4SoM kepOhC xbSBwBUvQ964rjQTgygn3632GdIAAAAhhLyAABUvQ964rjQT... 1/1
STATE OF ALASKA
ALASKA OIL AND GAS CONSERVATION COMMISSION
FACILITY REPORT OF PRODUCED GAS DISPOSITION
1. Facility Number
0290000031
2. Facility Name
PBU GC 1
3. Field
PBU - WOA
4. Operator
BP
5. MonthNear of Disposition
I December -2015
Disposition
Volume MCF
20. Forproduction from
multiple pools, list contribution or each pool as a percent of
Total Volume.
6.
Sold
0
Pool Name
Pool Code Percent
7.
Reinjected
0
PRUDHOE
640150 99.95%
LISBURNE
640144 0.00%
8.
Flared or vented 1 hour or less
dwil
51IFUS
oft Ili
MIDNIGHTSUN
640158 0.05%
s. :. PT MCINTYRE
640180 0.00%
9.
-17
Flared or vented more than 1 hour (see insh.)
10.
Pilot and Purge
57,519
11.
Assist Gas
0
12. Fuel gas used in lease operations.
803,125
13.
Other (see instructions)
0
Official Use Only
Authorization >t hr:
Safety
MCF
14. TOTAL VOLUME (ITEMS 6-12)
865,672
Lease Use
MCF
15. NGL Gas Equivalent
0
Conservation
MCF
16.
Purchased gas
0
Waste:
MCF
17.
Transferred from:
0
18.
Transferred to: (Express as a negative #) CGF
-70,371,880
Commissioner Date
19.
Remarks:
I hereby certify the a foregoing is true and correct to the best of my knowledge.
J'
Signature VOW 11 i Title Mana er Production Taxes and Ro alties Alaska
Note: All volumes must be corrected
to pressure of 14.65 psia and to a
temperature of 60o F. Authority 20
AAC25.235.
Printed Name Diane Colley Phone (907) 564-5775 Date 111,J6
Form 10-422 Rev. 512009 INSTRUCTIONS ON REVERSE SIDE Submit in Duplicate
DATE TIME
12/6/2015 1417-1421
12/6/2015 2012-2046
12/11/2015 1221-1226
TOTAL
DATE
TIME
12/6/2015
1817-2350
12/7/2015
0002-0633
12/7/2015
0025-0149
12/8/2015
1649-2352
12/9-10/2015
0000-2400
12/11/2015
0018-1218
12/13/2015
0000-2400
TOTAL
or
BP EXPLORATION (ALASKA) INC.
PRUDHOE BAY UNIT - GC -1
GAS FLARING INCIDENT REPORT
December 2015
3 Not required for unplanned events <= 1 hr
14
34
51
370 See attachments
490
63
140
1,597
1,990
195
4,845
1 Hour AND <= 5,000
VOLUME DE
See attachments
TOTAL 0
12/15/2015 1300-1315 99 See attachments
12/15/2015 2110-2117 33
TOTAL 132
ACTION TAKEN TO ELIMINATE CAUSE
Not required for unplanned events <= 1 hr
See attachments
See attachments
ACTION TAKEN TO ELIMINATE CAUSE
See attachments
Page 6
1/14/2016
4:19 PM
BP EXPLORATION (ALASKA) INC.
PRUDHOE BAY UNIT -GC -1
GAS FLARING INCIDENT REPORT
December 2015
TOTAL
Unplanned Events < 1 Hour 51
Unplanned Events> 1 Hour 4,845
Planned Events < 1 hour and not 0
exceeding 5,000 MCF
Planned Events > 1 hour or 132
exceeding 5,000 MCF l% A A 1
Pilot Purge 57,519R S E
Assist 0
TOTAL FLARED VOLUME 62,547
Page 7