Alaska Logo
Department of Commerce, Community, and Economic Development
Alaska Oil and Gas Conservation
Commission
Loading...
HomeMy WebLinkAboutPBU GC 2 - BP Exploration (Alaska) Inc.State of Alaska AOGCC Gas Disposition Files Year: 2015 Facility: PBU GC 2 Operator: BP EXPLORATION (ALASKA) INC.     STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMMISSION FACILITY REPORT OF PRODUCED GAS D1SPnS1T1nN RECEIVED FEB 19 2015 AOGCC 1. Facility Number 0290000032 2. Facility Name PI3 GC 2 3. Field PBU - WOA 4. Operator ... • BP 5. MonthlYear of Disposition Janua -2015 Disposition Volume MCF 20. For production from multiple pools, list contribution of each pool as a percent of Total Volume. 6. Sold Pool Name Pool Code Percent 7. ReinjectedO PRUDHOE 640150 91.90% AURORA 640120 2.52% 8. Flared or vented 1 hour or less 22,941 BOREALIS 640130 4.04% ORION 640135 0,67/ 9. Flared or vented more than 1 hour (see instr.) 0 POLARIS 640160 0.87% 10. Pilot and Purge 28,301 11. Assist Gas 12. Fuel gas used in lease operations. 662,847 13. Other (see instructions) Official Use Only Authorization -1 hr: Safety MCF 16. TOTAL VOLUME (ITEMS 6-12) 714,089 Lease Use MCF 15. NGL Gas Equivalent 0 Conservation MCF 16. Purchased gas 0 Waste: MCF 17. Transferred from: 0 18. Transferred to: (Express as a negative #) CGF -22,213,553 Commissioner Date 19. Remarks: I hereby certify that the foregoing is trueandcorrect to the best of my knowledge. Note: All volumes must be corrected Signature 111ttsllllll /V Title Manager Production Taxes and Ro allies Alaska to pressure of 14.65 psis and to a c temperature of 60o F. Authordy 20 Printed Name Diane Colley Phone (907) 564-5775 Date AAC25.235. Form 10-422 Rev. 5/2009 INSTRUCTIONS ON REVERSE SIDE Submit in Duplicate STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMMISSION FACILITY REPORT OF PRODUCED GAS DISPOSITION 1. Facility Number 0290000032 2. Facility Name PBU GC 2 3. Field PBU - WOA 4. Operator •5. BP MonthNear of Disposition I February -2015 Disposition Volume MCF 20. For production from multiple pools, list contribution of each pool as a percent of Total Volume. 6. Sold 0 Pool Name Pool Code Percent 7. Reinjected 0 PRUDHOE 640150 90.92% AURORA 640120 3.23% 8. Flared or vented 1 hour or less 188 BOREALIS 640130 4.28% ORION 640135 0.85% 9. Flared or vented more than 1 hour (see instr.) 12,500 POLARIS 640160 0.72% 10. Pilot and Purge 24,454 11. Assist Gas 0 12. Fuel gas used in lease operations. 584,293 13. Other (see instructions) 0 Official Use Only Authorization >1 he Safety lZ✓r�p MCF 14. TOTAL VOLUME (ITEMS 6-12) 621,435 Lease Use MCF 15. NGL Gas Equivalent 0 Conservation MCF 16. Purchased gas 0 Waste: MCF 17. Transferred from: 0 4— 4 -2/ - 15- 18. Transferred to: (Express as a negative #) CGF -17,440,775 Commissioner Date 19. Remarks: I hereby certify that the foregoing is true and correct to the best of my knowledge. Note: All volumes must be corrected Signature Title Manager Production Taxes a d Royalties Alaska to pressure of 14.65 psia and to a )/, l temperature of 60o F. Authority 20 Printed Name Diane ColleyPhone (907) 564-5775 oat /f% AAC25.235. VTI- 4/1ot15 Form 10422 Rev. 512009 INSTRUCTIONS ON REVERSE SIDE Submit in Duplicate BP EXPLORATION (ALASKA) INC. PRUDHOE BAY UNIT - GC -2 GAS FLARING INCIDENT REPORT February 2015 Unplanned Events less than or equal to 1 hour DATE TIME VOLUME DESCRIPTION OF INCIDENT & CAUSE ACTION TAKEN TO ELIMINATE CAUSE 2/2/2015 2233-2300 188 Not required for unplanned events <= 1 hr Not required for unplanned events <= 1 hr TOTAL 188 Unplanned Events greater than 1 hour DATE TIME VOLUME DESCRIPTION OF INCIDENT & CAUSE ACTION TAKEN TO ELIMINATE CAUSE 2/1-2/2015 1700-0800 12,500 See Attachments See Attachments TOTAL 12,500 Planned Events Less Than or Equal 1 Hour AND <= 5,000 mcf DATE TIME VOWMF m,CrRIGTinN nc lnirmcuT P. rAi ice ...T.......,�.�,. _. ....-.-___-..-- DATE Unplanned Events < i Hour Unplanned Events> 1 Hour Planned Events < 1 hour and not exceeding 5,000 MCF Planned Events > 1 hour or exceeding 5,000 MCF Pilot Purge Assist TOTAL FLARED VOLUME TOTAL N See Attachments See Attachments TOTAL 0 TOTAL 188 12,500 0 0 24,454 0 37,142 See Attachments See Attachments Page 8 3/13/2015 2:18 PM Flare Start Date 02/01/2015 Flare End Date 02/28/2015 GC2 Flare Report Total Volume (MSCFI 12688 Report Numbe System Date StartTime Stop Time Duration Intermittent Black Smoke Planned Reported By Volume u-22 Flare Relief 02/01/2015 5:00:00 pm 12:00:00 am 420 min No No No BP1\SQUIP2 5833 Determination Cause PWX dcs glitch took out whole facility in a stop production, had difficulty restarting LP & IP cpmmswm Action Taken Secure well pads- restart production 15-23 Flare Relief 02/02/2015 12:00:00 am 80000am 480 min No No No BP1\SQUIP2 6667 Determination Cause Difficulty restartin LP and IP compressors after DCS induced stop production Action Taken Minimized LP & IP production and restarted compressors as soon as available Total Volume (MSCF) 12688 Generated 03/08/2015 2:03:09PM Page 9 of 9 Hunt, Jennifer L (DOA) From: AK, OPS PCC EOC TL <AKOPSPCCEOCTL@bp.com> Sent: Friday, February 06, 2015 7:47 PM To: Hunt, Jennifer L (DOA) Cc: Loepp, Victoria T (DOA); Roby, David S (DOA); Castano, Alejandra; Benson, Gary A; Arthur, Gregory; AK, HSSEE Env Adv West; Hauger, Wayne A; AK, OPS GC2 OSM; AK, OPS GC2 Facility OTL; AK, OPS GC3&PCC OSM Subject: Flaring Event atI To: Jennifer Hunt, AOGCC CC: Dave Roby, AOGCC CC: Victoria Ferguson, AOGCC Lennifer.hunt(alalaska.gov dave.roby(cDalaska.aov victoria.ferousonnoalaska.q ov From: Jennifer Blake, GPB Production Optimization Team Leader A flaring event occurred at GC2 starting at 01/30/2015 12:57 and stopping at 01/30/2015 13:40 with a volume of 8750 (MSCF). The event had a volume greater than 5000 (MSCF) and was due to high ambient temperature swings. Flaring stopped when rate was cut. A flaring event occurred at GC2 starting at 02/01/2015 17:00 and stopping at 02/02/2015 with a volume of 5833 (MSCF). The event lasted for 420 minutes. The event had a volume greater than 5000 (MSCF) and was due to a Produced Water Section control system glitch that shutdown the whole facility in a stop production and subsequent difficulty restarting the LP & IP compressors. Flaring stopped when production was restarted with compressors back online. A flaring event occurred at GC2 starting at 02/02/2015 00:00 and stopping at 02/02/2015 08:00 with a volume of 6667 (MSCF). The event lasted for 480 minutes. The event had a volume greater than 5000 (MSCF) and was due to a faulty level transmitter that caused a modified stop production and subsequent difficult restarting the LP and IP compressors. Flaring stopped when rate was cut and compressors restarted Please let me know if you have any questions. Thanks, Jennifer Blake PCC/EOC Production Optimization Team Lead Office (907) 659-4472 Cell (907) 830-6204 Jennifer.blake@bp.com STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMMISSION FACILITY REPORT OF PRODUCED GAS DISPOSITION 1. Facility Number 0290000032 2. Facility Name PBU GC 2 3. Field PBU - WOA 4. Operator BP 5. Month/Year of Disposition I March -2015 Disposition Volume MCF 20. Forproduction from multiple pools, list contribution of each pool as a percent of Total Volume. 6. Sold 0 Pool Name Pool Code Percent 7. Reinjected 0 PRUDHOE 640150 89.97% AURORA 64 1120 4130/ 8. Flared or vented l hour or less 81 BOREALIS 640130 4.20% ORION 640135 0.98% 9. Flared or vented more than 1 hour (see instr.)O POLARIS 640160 0.72% 10. Pilot and Purge 27,621 11. Assist Gas 0 12. Fuel gas used in lease operations. 687,268 13. Other (see instructions) Official Use Only Authorization >1 hr: Safety MCF 14. TOTAL VOLUME (ITEMS 6-12) 714,970 Lease Use MCF 15. NGL Gas Equivalent 0 Conservation MCF 16. Purchased gas p Waste: MCF 17. Transferred from- 0 18. Transferred to: (Express as a negative #) CGF -18,359,486 Commissioner Date 19. Remarks: I hereby certify that the foregoing is true and correct to the best of my knowledge. Note: All volumes must be corrected Signature ,-"17-- Title Manager Production Taxes and Royalties Alaska to pressure of 14.65 psia and to a temperature of 60o F. Authority 20 Printed Name Diane Colley Phone (907) 564-5775 Date AAC25.235. Form 10-422 Rev. 5/2009 INSTRUCTIONS ON REVERSE SIDE Submit in Duplicate STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMMISSION FACILITY REPORT OF PRODUCED GAS DISPOSITION RECEIVED MAY 14 2015 AOGCC 1. Facility Number 0290000032 2. Facility Name PBU GC 2 3. Field PBU - WOA 4. Operator •5. BP MonthNear of Disposition I April -2015 Disposition Volume MCF 20. For production from multiple pools, list contribution of each pool as a percent of Total Volume. 6. Sold � Pool Name Poo[Code Percent 7. Reinjected U PRUDHOE 640150 91.69% AURORA 640120 3.06% 8. Flared or vented 1 hour or less 7,000 BOREALIS 640130 3,81% ORION 640135 0.81% 9. Flared or vented more than 1 hour (see instr.) 0 POLARIS 640160 0.639% 10. Pilot and Purge 28 920 11. Assist Gas 0 12. Fuel gas used in lease operations. 650,946 13. Other (see instructions) 6Official Use Only Authorization >1 hr: Safety MCF 14. TOTAL VOLUME (ITEMS 6-12) 686,866 Lease Use MCF 15. NGL Gas Equivalent 0 Conservation MCF 16. Purchased gas Waste: MCF 17. Transferred from: 0 Commissioner Date 18. Transferred to: (Express as a negative #) CGF -21,644,192 19. Remarks: I hereby certify that the foregoing is true and correct to the best of my knowledge. Note: All volumes must be corrected Signature /IX '�' 1 Title Manager Production Taxes and Ro alties Alaska to pressure of 14.65 psia and to a _temperature of 60o F. Authority 20 Printed Name Diane Colley Phone (907) 564-5775 Date AAC25.235. Form 10-422 Rev. 5/2009 INSTRUCTIONS ON REVERSE SIDE Submit in Duplicate STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMMISSION FACILITY REPORT OF PRODUCED GAS DIRP[11SiTinN gECEIVE® JUN 16 2015 AOGCC 1. Facility Number 0290000032 2. ility Name PBUFacGC 2 3. Field PBU - WOA 4. Operator •5. BP MonthNear of Disposition May -2015 Disposition Volume MCF 20. For production from multiple pools, list contribution of each pool as a percent of Total Volume. 6. Sold 0 Pool Name Pool Cotle Percent 7. Reinjected U PRUDHOE 640150 92.80% AURORA 640120 1.89% 8. Flared or vented 1 hour or less 13 BOREALIS 640130 4.03%,889 ORION 640135 0.77% 9. Flared or vented more than 1 hour (see instr.)573 POLARIS 640160 0.51% 10. Pilot and Purge 30,890 11. Assist Gas 0 12. Fuel gas used in lease operations. 557,686 13. Other (see instructions) 0 Official Use Only Authorization >1 he Safety ��� MCF 14. TOTAL VOLUME pTEM56.12) 603,038 Lease Use MCF 15. NGL Gas Equivalent Q Conservation MCF 16. Purchased gas 0 Waste. MCF 17. Transferred from: 0 30-�7-3o-�S 18. Transferred to: (Express as a negative #) CGF -18,396,185 Commissioner Date 19, Remarks: I hereby certify that the foregoing is true and correct to the best of my knowledge. / ///Jyy1p Note: All volumes must be corrected Signature ���"""((4 n. Title Manager Production Taxes and Royglties Alaska to pressure of 14.65 psia and to a temperature of 60o F. Authority 20 Printed Name Diane Colley Phone (907) 564-5775 Date / AAC25.235. Form 10-422 Rev, 512009 INSTRUCTIONS ON REVERSE SIDE Submit in Duplicate BP EXPLORATION (ALASKA) INC. PRUDHOE BAY UNIT- GC -2 GAS FLARING INCIDENT REPORT May 2015 iimc VULUME DESCRIPTION OF INCIDENT & CAUSE 5/22/2015 1714-1810 3,889 Not required for unplanned events <= 1 hr TOTAL 3,889 DESCRIPTION OF IN See Attachments EG1EIVED JUN 16 2015 Paye 1 nt 2(%!i ACTION TAKEN TO ELIMINATE CAUSE Not required for unplanned events <= 1 hr ACTION TAKEN TO E See Attachments 6/15/2015 1:49 PM TOTAL 0 Planned Events Less Than or Equal 1 Hour AND <= 5,000 mcf DATE TIME VOLUME DESCRIPTION OF INCIDENT 8, CAUSE ACTION TAKEN TO ELIMINATE CAUSE 5/16/2015 0424-0435 2,000 See Attachments See Attachments 5/16/2015 2300-2355 8,000 TOTAL 10,000 Planned Events Exceeding 1 Hour OR > 5,000 mcf DATE TIME VOLUME DESCRIPTION OF INCIDENT & CAUSE ACTION TAKEN TO ELIMINATE CAUSE 5/24/2015 1510-1625 573 See Attachments See Attachments TOTAL 573 TOTAL Unplanned Events < 1 Hour 3,889 Unplanned Events> 1 Hour 0 Planned Events < 1 hour and not 10,000 exceeding 5,000 MCF Planned Events > 1 hour or 573 exceeding 5,000 MCF Pilot Purge 30,890 Assist 0 TOTAL FLARED VOLUME 45,352 6/15/2015 1:49 PM Flare Start Date 05/01/2015 Flare End Date 05/31/2015 GC2 Flare Report Total Volume (MSCF) 14462 Report Numbs System Date StartTime Stop Time Duration Intermittent Black Smoke Planned Reported By Volume 15-142 Flare Relief 05/16/2015 4:24:00 am 4.35:00 am 11 min No No Yes BP1\WALLC7 2000 Determination Cause De -pressured Dbankslug catcherformaint. Action Taken vessel was de -pressured 15-142 Flare Relief 05/16/2015 11:0000 pm 11:55:00 pm 55 min No No Yes BPI\WALLC7 8000 Determination Cause De -pressured J pad LDF thru D slug catcher for maint. Action Taken Reduced J pad LDF to flare pressure and closed Flare valve Daily Volume (MSCF) 10000 15-151 Flare Relief 05/24/2015 3:10:00 pm 4:25:00 pm 75 min No No Yes BPI\FRANBD 573 Determination Cause Planned Water wash of K-7000 using coppus starting turbine. Action Taken End of procedure. Daily Volume (MSCF) 573 Total Volume (MSCF) 14462 RECEIVED JUN 16 2015 AOGCC Generated 05/08/2015 8:53:39AM Page 10 of 10 STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMMISSION FACILITY REPORT OF PRODUCED GAS DISPOSITION 1. Facility Number 0290000032 2. Facility Name PBU GC 2 3. Field PBU - WOA 4. Operator BP 5. MonthNear of Disposition June -2015 Disposition Volume MCF 20. For production from multiple pools, list contribution of each pool as a percent of Total Volume. 6. Sold 0 Pool Name Pool Code Percent 7. Reinjected 0 PRUDHOE 640150 91.95% AURORA 640120 3.230. 8. Flared or vented 1 hour or less 2 422 BOREALIS 640130 3.55%1,422 640135 0.77% 9. Flared or vented more than 1 hour (see instr.) 320 POLARIS .640160 0.50% 10. Pilot and Purge 28,820 11. Assist Gas 0 12. Fuel gas used in lease operations. 532,905 13. Other (see instructions) 0 Official Use Only Authorization >1 hr: Safety 3 z � MCF 14. TOTAL VOLUME (ITEMS 6.12) 564,467 Lease Use MCF 15. NGL Gas Equivalent 0 Conservation MCF 16. Purchased gas 0 Waste: MCF 17. Transferred from: 0 ?-2 18. Transferred to: (Express as a negative #) CGF -13,197,495 Commissioner Date 19. Remarks: I hereby certify that the foregoing is true and correct to the best of my knowledge. Note: All volumes must be corrected Signature d Title Manager Production Taxes and R5yalties Alaska to pressure of 14.65 psis and to a I temperature of 60o F. Authority 20 Gl Printed Name Diane ColleyPhone (907) 564-5775 Data v AAC25.235. VT f-- y�Z�lS- Form 10-422 Rev. 5/2009 INSTRUCTIONS ON REVERSE SIDE Submit in Duplicate BP EXPLORATION (ALASKA) INC. PRUDHOE BAY UNIT- GC -2 GAS FLARING INCIDENT REPORT June 2015 Page 13 Unplanned Events less than or equal to 1 hour DATE TIME VOLUME DESCRIPTION OF INCIDENT & CAUSE ACTION TAKEN TO ELIMINATE CAUSE 6/30/2015 2206-2225 422 Not required for unplanned events <= 1 hr Not required for unplanned events <= 1 hr TOTAL 422 unplanned Events greater than 1 hour DATE TIME VOLUME DESCRIPTION OF INCIDENT & CAUSE ACTION TAKEN TO ELIMINATE CAUSE See Attachments See Attachments TOTAL 0 Planned Events Less Than or Equal 1 Hour AND <= 5,000 mcf DATE TIME VOLUME DESCRIPTION OF INCIDENT & CAUSE ACTION TAKEN TO ELIMINATE CAUSE 6/1/2015 2200-2300 2,000 See Attachments See Attachments TOTAL 2,000 6/27/2015 6/29/2015 Unplanned Events < 1 Hour Unplanned Events> 1 Hour Planned Events < 1 hour and not exceeding 5,000 MCF Planned Events > 1 hour or exceeding 5,000 MCF Pilot Purge Assist TOTAL FLARED VOLUME 2228-2329 160 See Attachments 2156-2310 160 TOTAL 320 TOTAL 422 0 2,000 320 28,820 0 31,562 ACTION TAKEN TO E See Attachments 7/15/2015 3:53 PM Flare StartDate 06/01/2015 Flare End Date 06/30/2015 GC2 Flare Report Total Volume (MSCF) 2742 Report Numbs System Date Start Time Stop Time Duration Intermittent Black Smoke Planned Reported By Volume m-ioo Nara Keller 06/01/2015 10:00:00 pm 11:00:00 pm 60 min No No Yes BP1\GILLSJ 2000 Determination Cause Extended Flaring event occurred while awaiting GC operator/maintenance evaluation. D- Slug Catcher Depressure for PMP Action Taken No response taken as this was deemed to be of short duration. Daily Volume (MSCF) 2000 15-215 Flare Relief 06/27/2015 10:28:00 pm 11:29:00 pm 61 min No No Yes BP1\STYVJW 160 Determination Cause Planned J Pad Depressuring, for maintenancework. Action Taken Done depressuring J -Pad Daily Volume (MSCF) 160 15-221 Flare Relief 06/29/2015 9:56:00 pm 11:1000 pm 74 min No No Yes BP1\STYVJW 160 Determination Cause J -Pad depressurefor work on the pad. Action Taken Done with depressure for J -pad Daily Volume (MSCF) 160 Total Volume (MSCF) 2742 Generated 07/02/2015 3:52:31 PM Page 11 of 12 Hunt, Jennifer L (DOA) From: AK, OPS PCC EOC TL <AKOPSPCCEOCTL@bp.com> Sent: Monday, June 29, 2015 6:19 AM To: Hunt, Jennifer L (DOA) Cc: Loepp, Victoria T (DOA); Castano, Alejandra; Benson, Gary A; Arthur, Gregory, AK, OPS GC3&PCC OSM; Borton, Kim; AK, HSSEE Env Adv West; AK, OPS GC2 Facility OTL; AK, OPS GC2 OSM Subject: Flaring Event at GC2 To: Jennifer Hunt, AOGCC CC: Victoria Loepp, AOGCC iennifer.huntCc alaska.00v Victoria. loepp(7aalaska.00v From: Jennifer Blake, GPB Production Optimization Team Leader A flaring event occurred at GC2 starting at 06/27/2015 22:28 and stopping at 06/27/2015 23:29 with a volume of 160 (MSCF). The event lasted for 61 minutes and was due to depressurizing J Pad for planned maintenance work. The event stopped once de -pressured. Thanks, Jennifer Blake PCC/EOC Production Optimization Team Lead (alt David Spall) Office (907) 659-4472 Cell (907) 830-6204 Jennifer.blake@bp.com Hunt, Jennifer L (DOA) From: AK, OPS PCC EOC TL <AKOPSPCCEOCTL@bp.com> Sent: Tuesday, June 30, 2015 8:45 AM To: Hunt, Jennifer L (DOA) Cc: Loepp, Victoria T (DOA); Castano, Alejandra; Benson, Gary A; Arthur, Gregory; AK, OPS GC3&PCC OSM; Borton, Kim; AK, HSSEE Env Adv West; AK, OPS GC2 Facility OTL; AK, OPS GC2 OSM Subject: Flaring Event at GC2 To: Jennifer Hunt, AOGCC CC: Victoria Loepp, AOGCC jenn ifer. hu ntCo?a laska.gov Victoria. loeppna.alaska. gov From: Jennifer Blake, GPB Production Optimization Team Leader A flaring event occurred at GC2 starting at 06/29/2015 21:56 and stopping at 06/29/2015 23:10 with a volume of 160 (MSCF). The event lasted for 74 minutes and was due to J -Pad depressure for maintenance work on the pad. The event stopped when the depressurization was complete. Thanks Jennifer Blake PCC/EOC Production Optimization Team Lead (alt David Spall) Office (907) 659-4472 Cell (907) 830-6204 Jennifer.blakeC@bp.com STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMMISSION FACILITY REPORT OF PRODUCED GAS DISPOSITION 1. Facility Number 0290000032 2. Facility Name PBU GC 2 3. Field PBU - WOA 4. Operator BP 5. MonthNear of Disposition 1 JUI -2015 Disposition Volume MCF 20. For production from multiple pools, list contribution of each pool as a percent of Total Volume. 6. Sold 0 Pool Name Pool Code Percent 7. ReinjectedD PRUDHOE 640150 93.90% AURORA 640120 2,09^/ 8. Flared or vented 1 hour or less U BOREALIS 640130 2.94% ORION 640135 0.68% 9. Flared or vented more than 1 hour (see insh.) D POLARIS 640160 0.397/0 10. Pilot and Purge 28,904 11. Assist Gas U 12. Fuel gas used in lease operations. 635,716 13. Other (see instructions) U Official Use Only Authorization >1 hr Safety MCF 14. TOTAL VOLUME (ITEMS 6-12) 664,620 Lease Use MCF 15. NGL Gas Equivalent U Conservation MCF 16. Purchased gas U Waste: MCF 17. Transferred from: 0 18. Transferred to: (Express as a negative #) CGF-17,391,273 Commissioner Date 19. Remarks: I hereby certify that the foregoing is true and correct to the best of my knowledge. // !/Q »! Note: All volumes must be corrected Signature E -1l 'f K Title Manager Production Taxes and Royal ies Alaska to pressure of 14.65 psis and to a �/ i temperature of 60o F. Authority 20 Printed Name Diane ColleyPhone (907) 564-5775 Date b I AAC25.235. Form 10-422 Rev. 512009 INSTRUCTIONS ON REVERSE SIDE Submit in Duplicate STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMMISSION FACILITY REPORT OF PRODUCED GAS DISPOSITION 1. Facility Number 0290000032 2. Facility Name PBU GC 2 3. Field PBU - WOA 4. Operator BP I 5. MonthNear of Disposition August -2015 Disposition Volume MCF 20. For production from multiple pools, list contribution of each pool as a percent of Total Volume. 6. Sold Pool Name Pool Code Percent 7. Reinjected O PRUDHOE 640150 95.90°/ AURORA 640120 1.17% 8. Flared or vented 1 hour or less 2 ,083 BOREALIS 640130 2.23% ORION 640135 0.47% 9. Flared or vented more than 1 hour (see instr.) 295 POLARIS 640160 0.23% 10. Pilot and Purge 24,921 11. Assist Gas 0 12. Fuel gas used in lease operations. 540,989 13. Other (see instructions) 0 Official Use Only Authorization>1 hr: Safety 2 q 5 MCF 14. TOTAL VOLUME (ITEMS 6.12) 568,288 Lease Use MCF 15. NGL Gas Equivalent 0 Conservation MCF 16. Purchased gas 0 Waste: MCF 17. Transferred from: 0 _ 5 Coffirnissioner Dale 18. Transferred to: (Express as a negative #) CGF -17,717,148 19. Remarks: I hereby certify that the foregoing is true 1 and correct to the best of my knowledge. �LC�/ tt / 0) ,. Note: All volumes must be corrected Signature litL�i'J�� Y) Tide Mana er Production Taxes and Ro alties Alaska to pressure of 14.65 psis and to a temperature of 60o F. Authority 20 Printed Name Diane Colley Phone (907) 564-5775 Date LN� AAC25.235. VT -1 Form 10-422 Rev. 5/2009 INSTRUCTIONS ON REVERSE SIDE Submit in Duplicate 8/14/2015 8/18/2015 BP EXPLORATION (ALASKA) INC. PRUDHOE BAY UNIT - GC -2 GAS FLARING INCIDENT REPORT August 2015 TIME VOLUME DESCRIPTION OF INCIDENT & CAUSE 1942-2008 1,264 Not required for unplanned events <= 1 hr TOTAL 1,264 2151-2359 TOTAL 267 See Attachments 267 Page 9 Not required for unplanned events <= 1 hr See Attachments CAUSE Planned Events Less Than or Equal 1 Hour AND <= 5,000 mcf DATE TIME VOLUME DESCRIPTION OF INCIDENT & CAUSE ACTION TAKEN TO ELIMINATE CAUSE 8/29/2015 0801-0900 819 See Attachments See Attachments TOTAL 819 Planned Events Exceeding 1 Hour OR > 5,000 mcf DATE TIME VOLUME DESCRIPTION OF INCIDENT & CAUSE ACTION TAKEN TO ELIMINATE CAUSE 8/18/2015 1630-2000 28 See Attachments See Attachments TOTAL 28 TOTAL Unplanned Events < 1 Hour 1,264 Unplanned Events > 1 Hour 267 Planned Events < 1 hour and not 819 exceeding 5,000 MCF Planned Events> 1 hour or 28 exceeding 5,000 MCF Pilot Purge 24,921 Assist 0 TOTAL FLARED VOLUME 27,299 9/11/2015 10:38 AM Flare StartDate 08/01/2015 Flare End Date 08/31/2015 GC2 Flare Report Total Volume (MSCF) 2378 Report Numbs System Date Start Time Stop Time Duration Intermittent Black Smoke Planned Reported By Volume 15-270 Flare Relief 08/18/2015 4:30:OOpm 8:00:00 pm 210 min No No Yes BP1\PAOLINJM 28 Determination Cause Depressure N -Pad to flare for shutdown work. Action Taken N -Pad depressured. 15-270 Flare Relief 08/18/2015 9:51:00 pm 11:59:00 pm 128 min Yes No No BP1\PAOLINJM 287 Determination Cause Flaring off of LP suction scrubber due to lack of gas to keep IP compressor happy causing LP to back pressure. Action Taken No response taken as this was deemed to be of short duration. Daily Volume (MSCF) 295 15-287 Flare Relief 08/29/2015 8:01:00 am 9:00:00 am 59 min No Determination Cause Used C bank to depressure S LDFduetoa leakwell pad. Action Taken LDF deppressured to 0 psi and stopped flaring. Generated 09/022015 9:47:02AM No Yes BMSQUIP2 819 Daily Volume (MSCF) 819 Total Volume (MSCF) 2378 Page 9 of 10 Hunt, Jennifer L (DOA) From: AK, OPS PCC EOC TL <AKOPSPCCEOCTL@bp.com> Sent: Sunday, August 23, 2015 4:53 PM To: Hunt, Jennifer L (DOA) Cc: Loepp, Victoria T (DOA); Glover, Robin (SLR); Benson, Gary A; Arthur, Gregory; AK, OPS GC3&PCC OSM; Borton, Kim; AK, HSSEE Env Adv West; AK, OPS GC2 Facility OTL; AK, OPS GC2 OSM Subject: Flaring Event atas To: Jennifer Hunt, AOGCC CC: Victoria Loepp, AOGCC ennifer.hunt(o)alaska oov Victoria. loeooCa alaska.00v From: Jennifer Blake, GPB Production Optimization Team Leader A flaring event occurred at GC2 starting at 08/18/2015 16:30 and stopping at 08/18/2015 20:00 with a volume of 28 (MSCF). The event lasted for 210 minutes and was due to N -Pad depressurization for maintenance work on the pad. The event stopped when the depressurization was complete. A flaring event occurred at GC2 starting at 08/18/2015 21:51 and stopping at 08/18/2015 23:59 with a volume of 267 (MSCF). The event lasted for 128 minutes and was due to flaring off the LP suction scrubber due to low gas rates due to maintenance activities. The flaring did not continue into 8/19. Thanks, Jennifer Blake PCC/ECC Production Optimization Team Lead (alt David Spall) Office (907) 659-4472 Cell (907) 830-6204 Jennifer.blake@bo.com STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMMISSION FACILITY REPORT OF PROnuCFn roc nicpnc1T1nK1 - L Facility Number 2. Facility Name 0290000032 PBU GC 2 Disposition - - - 3. Field PBU - WOA Volume MCF - -- -.._ _...... § I ..,.. 4. Operator 5. MonlhNear of Disposition BP September -2015 20. For production from multiple pools, list contribution of each pool as a percent of Total Volume. 6. Sold O Pool Name Pool Code Percent 7. Reinjected U PRUDHOE 640150 94.02% AURORA 640120 2.33% 8. Flaredorvented 1 hourorless 13,445BOREALIS 640130 2.52% ORION 640135 0.87% 9. Flared or vented more than 1 hour (see instr.) U POLARIS 640160 0.26% 10. Pilot and Purge 26,532 - 11. Assist Gas U ' 12. Fuel gas used in lease operations. 480,229 13. Other (see instructions) U Official Use Only Authorization >1 hr: Safety MCF 14. TOTAL VOLUME (ITEMS 6-12) 520,206 Lease Use MCF 15. NGL Gas Equivalent 0 Conservation MCF 16. Purchased gas U Waste: MCF 17. Transferred from: U Commissioner Dale 18. Transferred to: (Express as a negative #) CGF -16,150,188 19, Remarks: I hereby certify that the foregoing is true and correct to the best of my knowledge. Signature W(� Note: All volumes must be corrected Title Manager Production Taxes and Ro alties Alaska to pressure of 14.65 psia and to a temperature of 60o F. Authority 20 Printed Name Diane Colley Phone (907) 564-5775 Date AAC25.235. Form 10-422 Rev. 5/2009 INSTRUCTIONS ON REVERSE SIDE Submit in Duplicate BP EXPLORATION (ALASKA) INC. PRUDHOE BAY UNIT - GC -2 GAS FLARING INCIDENT REPORT Page 8 September 2015 9/19/2015 I RJW yr 1NCIDENT & CAUSE ACTION TAKEN TO ELIMINATE CAUSE 2155-2251 12,056 Not required for unplanned events <= 1 hr Not required for unplanned events <= 1 hr TOTAL 12,056 See Attachments See Attachments TOTAL 0 led Events Less Than or Equal 1 Hour AND <= 5,000 mcf DATE TIME VOLUME DESCRIPTION OF INCIDENT & CAUSE 9/18/2015 0007-0047 1,389 See Attachments ACTIONTAKENTOs See Attachments TOTAL 1,389 ed Events Exceeding 1 Hour OR > 5,000 mcf DATE TIME VOLUME DESCRIPTION OF INCIDENT & CAUSE ACTION TAKEN TO EL See Attachments See Attachments TOTAL 0 Unplanned Events < 1 Hour TOTAL 12,056 Unplanned Events> 1 Hour 0 Planned Events < 1 hour and not exceeding 5,000 MCF 1,389 Planned Events > 1 hour or exceeding 5,000 MCF 0 Pilot Purge 26,532 Assist 0 TOTAL FLARED VOLUME 39,977 10/15/2015 10:43 AM Flare Start Date 09/01/2015 Flare End Date 09/30/2015 GC2 Flare Report Total Volume (MSCF) 13445 Report Numbs System Date StartTime Stop Time Duration Intermittent Black Smoke Planned Reported By Volume 15-309 Flare Relief 09/18/2015 12:07:00 am 12:47:00 am 40 min No No Yes BPIISQUIP2 1389 Determination Cause Depressunng R Pad through "C' bank Slugcetcher for scheduled work Action Taken Finished depressure Daily Volume (MSCF) 1389 Total Volume (MSCF) 13445 10/02/2015 2:48:30PM Page 7 of 8 STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMMISSION FACILITY REPORT OF PRODUCED GAS DISPOSITION 1. Facility Number 0290000032 2. Facility Name PBU GC 2 3. Field PBU - WOA 4. Operator BP 5. MonthNear of Disposition I October -2015 Disposition Volume MCF 20. Forproduction from multiple pools, list contribution of each pool as a percent of Total Volume. 6. Sold 0 Pool Name Pool Code Percent 7. Reinjected 0 PRUDHOE 640150 95.44°/ ' AURORA 640120 2.04% 8. Flared or vented 1 hour or less 968 BOREALIS 640130 1.45% ORION 640135 0.67% 9. Flared or vented more than 1 hour (see insir.) 0 POLARIS 640160 0.403% 10. Pilot and Purge 32,897 , 11. Assist Gas 0 12. Fuel gas used in lease operations. 693,986 13. Other (see instructions) 0 Official Use Only • Authorization >1 hr: Safety MCF 14. TOTAL VOLUME (ITEMS 6-12) 727,851 Lease Use MCF 15. NGL Gas Equivalent 0 Conservation MCF 16. Purchased gas 0 Waste: MCF 17. Transferred from: 0 - Commissioner Date 18. Transferred to: (Express as a negative #) CGF -18,961,558 19. Remarks: I hereby certify that the foregoing is true and correct to the best of my knowledge. 6mi/ Note: All volumes must be corrected Signature Title Mana er Production Taxes and Royalties Alaska to pressure of 14.65 psis and to a / ) temperature of 60o F. Authority 20 Printed Name Diane ColleyPhone (907) 564-5775 Date l� I ki AAC25.235. Form 10-422 Rev. 5/2009 INSTRUCTIONS ON REVERSE SIDE Submit in Duplicate BP EXPLORATION (ALASKA) INC. PRUDHOE BAY UNIT - GC -2 GAS FLARING INCIDENT REPORT October 2015 Page 10 Unplanned Events less than or equal to 1 hour DATE TIME VOLUME. DESCRIPTION OF INCIDENT & CAUSE ACTION TAKEN TO ELIMINATE CAUSE 10/5/2015 1547-1600 135 Not required for unplanned events <= 1 hr Not required for unplanned events <= 1 hr 10/26/2015 2135-2145 69 10/27/2015 1341-1352 764 TOTAL 968 DATE See Attachments See Attachments TOTAL 0 Planned Events Less Than or Equal 1 Hour AND <= 5,000 mcf DATE TIME VOLUME DESCRIPTION OF INCIDENT & CAUSE ACTION TAKEN TO ELIMINATF rA11CF TOTAL DATE TOTAL Unplanned Events < 1 Hour Unplanned Events> 1 Hour Planned Events < 1 hour and not exceeding 5,000 MCF Planned Events > 1 hour or exceeding 5,000 MCF Pilot Purge Assist TOTAL FLARED VOLUME See Attachments 0 9 TOTAL 968 0 0 0 32,897 0 33,865 See Attachments See Attachments See Attachments 11/16/2015 3:35 PM Flare Start Date 10/01/2015 Flare End Date 10/31/2015 GC2 Flare Report Total Volume (MSCF) 968 Report Numbe System Date Start Time Stop Time Duration Intermittent Black Smoke Planned Reported By Volume Total Volume (MSCF) 968 oenemlea TVUti/2015 3.2534PM Page 12 of 12 STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMMISSION FACILITY REPORT OF PRODUCED roe rnSpnc1T1nti 1. Facility Number 2. Facility Name 0290000032 PBU GC 2 Disposition 33. Fi Id VVOA Volume MCF 4B.pOperator 5. MonthNear of Disposition November -2015 20. For production from multiple pools, list contribution of each pool as a percent of Total Volume. 6. Sold ° Pool Name Pool Code Percent 7. Reinjected ° PRUDHOE 640150 95.08% AURORA 64 1120 2.43% 8. Flared or vented 1 hour or less 5,962 BOREALIS 640130 1.57% ORION 640135 0.50% 9. Flared or vented more than 1 hour (see ins[r.) 2,133 POLARIS 640160 0.42/ 10. Pilot and Purge 30,344 11, Assist Gas 0 12. Fuel gas used in lease operations. 715,761 13. Other (see instructions) ° Official Use Only Authorization >7 hr: 21-33 MCF 14. TOTAL VOLUME (ITEMS 6-12)Safety 754,200 Lease Use MCF 15, NGL Gas Equivalent ° Conservation MCF 16. Purchased gas ° Waste: MCF 17. Transferred from. D Commissioner Dale 18. Transferred to. (Express as a negative #) CGF -19,721,939 19. Remarks: I hereby certify that the foregoing is true and correct to the best of my knowledge. Signature �� Note: All volumes must be corrected TitleMana er Production TaxesRies Alaska to pressure of 14.65 psia and to a U temperature of 60o F. Authority 20 Printed Name Diane Colley Phone (907) 564-5775 Date AAC25.235. I/T L 1/5-/16 Farm 10-422 Rev. 512009 INSTRUCTIONS ON REVERSE SIDE Submit in Duplicate BP EXPLORATION (ALASKA) INC PRUDHOE BAY UNIT - GC -2 11/7/2015 0909-1109 2,133 See Attachments See Attachments GAS FLARING INCIDENT REPORT Page 7 2,133 November 2015 tanned Events less than or equal to 1 hour Planned Events Less Than or Equal 1 Hour AND <= 5,000 mcf DATE 11/1/2015 TIME VOLUME DESCRIPTION OF INCIDENT & CAUSE ACTION TAKEN TO ELIMINATE CAUSE DESCRIPTION OF INCIDENT & CAUSE 1256-1335 677 Not required for unplanned events <= 1 hr Not required for unplanned events <= 1 hr 11/5/2015 0605-0615 1,389 0 11/7/2015 0500-0522 112 11/17/2015 0503-0516 271 VOLUME 11/23/2015 1112-1145 3,438 11/24/2015 0110-0114 6 0 11/28/2015 1143-1153 69 TOTAL TOTAL 5,962 5,962 11/7/2015 0909-1109 2,133 See Attachments See Attachments TOTAL 2,133 Planned Events Less Than or Equal 1 Hour AND <= 5,000 mcf DATE TIME VOLUME DESCRIPTION OF INCIDENT & CAUSE ACTION TAKEN TO ELIMINATE CAUSE See Attachments See Attachments TOTAL 0 Planned Events Exceeding 1 Hour OR > 5,000 mcf DATE TIME VOLUME DESCRIPTION OF INCIDENT & CAUSE ACTION TAKEN TO ELIMINATE CAUSE See Attachments See Attachments TOTAL 0 TOTAL Unplanned Events < 1 Hour 5,962 Unplanned Events> 1 Hour 2,133 Planned Events <1 hour and not 0 exceeding 5,000 MCF Planned Events > 1 hour or 0 exceeding 5,000 MCF Pilot Purge 30,344 Assist 0 TOTAL FLARED VOLUME 38,439 12/15/2015 9:52 AM Flare StartDate 11/01/2015 Flare End Date 11/30/2015 GC2 Flare Report Total Volume (MSCF) 8095 Report Numbe System Date Start Time Stop Time Duration Intermittent Black Smoke Planned Reported By Volume 15-376 Flare Relief 11/07/2015 90900 am 11:09:00 am 120 min No No No BP1\STYVJW 2133 Determination Cause IF compressor shut down because of a problem associated with troubleshooting of Lube oil system. Action Taken K-207 IF compressor was restarted Total Volume (MSCF) 8095 Generated 12/03/2015 4:18:41 PM Page 6 of 7 11/2012015 Flaring Event at GC2 Flaring Event at GC2 AK, OPS PCC EOC TL [AKOPSPCCEOCTL@bp.com] Sent:Sunday, November 08, 2015 7:08 PM To: AOGCC Reporting (DOA sponsored) Cc: Loepp, Victoria T (DOA); Benson, Gary A [Gary.Benson@bp.com]; Arthur, Gregory [Gregory.Arthur@bp.com]; AK, OPS GC3&PCC OSM [AKOPSGC3PCCOSM@BP.com]; Borton, Kim [Kim.Borton@bp.com]; AK, HSSEE Env Adv West [AKHSSEEEnvAdvWest@bp.com]; AK, OPS GC2 Facility OTL [AK0PSGC2Facility0TL@bp.com]; Glover, Robin (SLR) [Robin.Glover@bp.com]; AK, OPS GC2 OSM [AKOPSGC20SM@bp.com] To: AOGCC Reporting CC: Victoria Loepp, AOGCC Aomc reporting@alaska gov Victoda.loeoala alaska.gov From: Jennifer Blake, GPB Production Optimization Team Leader A flaring event occurred at GC2 starting at 11/07/2015 09:09 and stopping at 11/07/2015 11:09 with a volume of 2133 (MSCF). The event lasted for 120 minutes and was due to an IP compressor shutdown as a result of a problem associated with troubleshooting the Lube oil system. The event stopped when the IP Compressor was restarted. Thanks, Jennifer Blake PCC/EOC Production Optimization Team Lead (alt David Spall) Office (907) 659-4472 Cell (907) 830-6204 Jennifer.blake@bp.com https://webmaila.almka.gov/owa/?ae=Item&t=IPM.Note&id=RgAAAABKLne2zgP4SoMkepOhCxbSBwBUvQ964rjQTgYgn3632GdL AAAhhLyAABUvQ964rjQT... 1/1 STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMMISSION FACILITY REPORT OF PRODUCED GAS DIRPnRITinN 1. Facility Number2. 0290000032 Facility Name PBU GC 2 3. Field PBU - WOA 4. Operator •5. BP Month/Year of Disposition December -2015 Disposition Volume MCF 20. For production from multiple pools, list contribution of each pool as a percent of Total Volume. 6. SoldO ]Name Pool Code Percent 7. Reinjected PRUDHOE 640150 94.63% AURORA 640120 2.24% 8. Flared or vented 1 hour or less 0 BOREALIS 640130 2.02 ORION 640135 0.66% 9. Flared or vented more than 1 hour (see instr.) 300 POLARIS 640160 0.45% 10. Pilot and Purge 29,742 11, Assist Gas 0 12. Fuel gas used in lease operations. 669,762 13. Other (see instructions) 0 Official Use Only Authorization >1 hr: Safety G fJ MCF 14. TOTAL VOLUME (ITEMS 6-12) 699,804 Lease Use MCF 15. NGL Gas Equivalent 0 Conservation MCF 16. Purchased gas Waste: MCF 17. Transferred from:0 /�, / Z _ (r b `Commissioner 18. Transferred to: (Express as a negative #) CGF -21,171,738 Date 19. Remarks: I hereby certify that the foregoing is true and correct to the best of my knowledge. Note: All volumes must be corrected Signature Title Manager Production Taxes and Ro allies Alaska to pressure of 14.65 psia and to a temperature of 60o F. Authority 20 Printed Name Diane Colley Phone (907) 564-5775 Date ///[J-// ^ AAC25.235. V, -F L- 2 _ 2/1r,1f4 Form 10-422 Rev. 5/2009 INSTRUCTIONS ON REVERSE SIDE Submit in Duplicate than or equal to 1 TOTAL TIME BP EXPLORATION (ALASKA) INC. PRUDHOE BAY UNIT -GC -2 GAS FLARING INCIDENT REPORT December 2015 Not required for unplanned events <= 1 hr 0 Not required for unplanned events <= 1 hr - --- """•" ""^ — •^`•"° "^ u�. ALI ION TAKEN TO ELIMINATE CAUSE See Attachments See Attachments TOTAL 0 Planned Events Less Than or Equal 1 Hour AND <= 5.000 mcf Page 8 1/14/2016 4:19 PM See Attachments See Attachments TOTAL 0 Planned Events Exceeding 1 Hour OR > 5,000 mcf DATE 12/22/2015 TIME 0413-0514 VOLUME DESCRIPTION OF INCIDENT&CAUSE ACTION TAKENTO ELIMINATE CAUSE 300 See Attachments See Attachments TOTAL 300 TOTAL Unplanned Events < 1 Hour 0 Unplanned Events> 1 Hour 0 Planned Events < 1 hour and not 0 exceeding 5,000 MCF Planned Events> 1 hour or 300 exceeding 5,000 MCF Pilot Purge 29,742 Assist 0 TOTAL FLARED VOLUME 30,042 Page 8 1/14/2016 4:19 PM Flare Start Date 12/01/2015 Flare End Date 12/3112015 GC2 Flare Report Total Volume (MSCF) 300 Report Numbe System Date Start Time Stop Time Duration Intermittent Black Smoke Planned Reported By Volume 15-411 Flare Relief 12/22/2015 4:13:00 am 5:14:00 am 61 min No No Yes BP1%LEGNJB 300 Determination Cause R -Pad De -pressured for pigging Action Taken Stopped flaring after pig was loaded Total Volume (MSCF) 300 Generated 01/08/2016 11:15:02AM Page 7 of 7 12/30/2015 RE: Flaring Event at GC2 RE: Flaring Event at GC2 AK, OPS PCC EOC TL [AKOPSPCCEOCTL@bp.com] Sent:Sunday, December 27, 2015 12:59 PM To: AOGCC Reporting (DOA sponsored) Cc: Loepp, Victoria T (DOA); Glover, Robin (SLR) [Robin.Glover@bp.com]; Benson, Gary A [Gary.Benson@bp.com]; Arthur, Gregory [Gregory.Arthur@bp.com]; AK, OPS GC3&PCC OSM [AKOPSGC3PCCOSM@BP.com]; Borton, Kim [Kim.Borton@bp.com]; AK, HSSEE Env Adv West [AKHSSEEEnvAdvWest@bp.com]; AK, OPS GC2 Facility OTL [AKOPSGC2FacilityOTL@bp.com]; AK, OPS GC2 OSM [AKOPSGC20SM@bp.com]; Boughton, Leslie A [Leslie.Boughton@bp.com]; Kain, Rachel B [Rachel.Kain@bp.com] My apologizes. I am resubmitting due to using the old TO: Address. From: AK, OPS PCC EOC TL Sent: Sunday, December 27, 2015 12:58 PM To: 'jennifer.hunt@alaska.gov' Cc: 'Loepp, Victoria T (DOA) (victoria.loepp@alaska.gov)'; Glover, Robin (SLR); Benson, Gary A; Arthur, Gregory; AK, OPS GC3&PCC OSM; Borton, Kim; AK, HSSEE Env Adv West; AK, OPS GC2 Facility OTL; AK, OPS GC2 OSM; Boughton, Leslie A; Kain, Rachel B Subject: Flaring Event at GC2 To: Jennifer Hunt, AOGCC CC: Victoria Loepp, AOGCC iennifer.hunt@alaska Qov Victoria. loeope-alaska.aov From: David Spall, GPB Production Optimization Team Leader A flaring event occurred at GC2 starting at 12/22/2015 04:13 and stopping at 12/22/2015 05:14 with a volume of 300 (MSCF). The event lasted for 61 minutes and was due to R -Pad De -pressured for pigging. The event stopped flaring after pig was loaded and wells were shut-in at R -Pad. Thanks, David Spall (Alternate—Jennifer Blake) PCC/EOC Production Optimization Team Lead 907-659-4472 Office 219-689-4036 Cell david.spall0bp.com https://webm aila.alaska.gov/owa/?ae=Item &t=IPM.N ote&id= RgAAAABKLne2zgP4SoM kepOhC xbSBwBU vQ964rj QTgYgn3632GdIAAAAhhLyAABUvQ964rjQT... 1/1