Department of Commerce, Community, and Economic Development
Alaska Oil and Gas Conservation Commission
Loading...
HomeMy WebLinkAboutPBU GC 2 - BP Exploration (Alaska) Inc.State of Alaska AOGCC
Gas Disposition Files
Year: 2015
Facility: PBU GC 2
Operator: BP EXPLORATION (ALASKA) INC.
STATE OF ALASKA
ALASKA OIL AND GAS CONSERVATION COMMISSION
FACILITY REPORT OF PRODUCED GAS D1SPnS1T1nN
RECEIVED
FEB 19 2015
AOGCC
1. Facility Number
0290000032
2. Facility Name
PI3 GC 2
3. Field
PBU - WOA
4. Operator ... •
BP
5. MonthlYear of Disposition
Janua -2015
Disposition
Volume MCF
20. For production from multiple pools, list contribution of each pool as a percent of
Total Volume.
6. Sold
Pool Name Pool Code Percent
7. ReinjectedO
PRUDHOE 640150 91.90%
AURORA 640120 2.52%
8. Flared or vented 1 hour or less
22,941
BOREALIS 640130 4.04%
ORION 640135 0,67/
9. Flared or vented more than 1 hour (see instr.)
0
POLARIS 640160 0.87%
10. Pilot and Purge
28,301
11. Assist Gas
12. Fuel gas used in lease operations.
662,847
13. Other (see instructions)
Official Use Only
Authorization -1 hr:
Safety
MCF
16. TOTAL VOLUME (ITEMS 6-12)
714,089
Lease Use
MCF
15. NGL Gas Equivalent
0
Conservation
MCF
16. Purchased gas
0
Waste:
MCF
17. Transferred from:
0
18. Transferred to: (Express as a negative #) CGF
-22,213,553
Commissioner Date
19. Remarks:
I hereby certify that the foregoing is trueandcorrect to the best of my knowledge.
Note: All volumes must be corrected
Signature 111ttsllllll /V Title Manager Production Taxes and Ro allies Alaska to pressure of 14.65 psis and to a
c
temperature of 60o F. Authordy 20
Printed Name Diane Colley Phone (907) 564-5775 Date AAC25.235.
Form 10-422 Rev. 5/2009 INSTRUCTIONS ON REVERSE SIDE Submit in Duplicate
STATE OF ALASKA
ALASKA OIL AND GAS CONSERVATION COMMISSION
FACILITY REPORT OF PRODUCED GAS DISPOSITION
1. Facility Number
0290000032
2. Facility Name
PBU GC 2
3. Field
PBU - WOA
4. Operator •5.
BP
MonthNear of Disposition
I February -2015
Disposition
Volume MCF
20. For production from multiple pools, list contribution of each pool as a percent of
Total Volume.
6. Sold
0
Pool Name Pool Code Percent
7. Reinjected
0
PRUDHOE 640150 90.92%
AURORA 640120 3.23%
8. Flared or vented 1 hour or less
188
BOREALIS 640130 4.28%
ORION 640135 0.85%
9. Flared or vented more than 1 hour (see instr.)
12,500
POLARIS 640160 0.72%
10. Pilot and Purge
24,454
11. Assist Gas
0
12. Fuel gas used in lease operations.
584,293
13. Other (see instructions)
0
Official Use Only
Authorization >1 he
Safety
lZ✓r�p
MCF
14. TOTAL VOLUME (ITEMS 6-12)
621,435
Lease Use
MCF
15. NGL Gas Equivalent
0
Conservation
MCF
16. Purchased gas
0
Waste:
MCF
17. Transferred from:
0
4— 4 -2/ - 15-
18. Transferred to: (Express as a negative #) CGF
-17,440,775
Commissioner Date
19. Remarks:
I hereby certify that the foregoing is true and correct to the best of my knowledge.
Note: All volumes must be corrected
Signature Title Manager Production Taxes a d Royalties Alaska to pressure of 14.65 psia and to a
)/, l temperature of 60o F. Authority 20
Printed Name Diane ColleyPhone (907) 564-5775 oat /f% AAC25.235.
VTI-
4/1ot15
Form 10422 Rev. 512009 INSTRUCTIONS ON REVERSE SIDE Submit in Duplicate
BP EXPLORATION (ALASKA) INC.
PRUDHOE BAY UNIT - GC -2
GAS FLARING INCIDENT REPORT
February 2015
Unplanned Events less than or equal to 1 hour
DATE TIME VOLUME DESCRIPTION OF INCIDENT & CAUSE ACTION TAKEN TO ELIMINATE CAUSE
2/2/2015 2233-2300 188 Not required for unplanned events <= 1 hr Not required for unplanned events <= 1 hr
TOTAL 188
Unplanned Events greater than 1 hour
DATE TIME VOLUME DESCRIPTION OF INCIDENT & CAUSE ACTION TAKEN TO ELIMINATE CAUSE
2/1-2/2015 1700-0800 12,500 See Attachments See Attachments
TOTAL 12,500
Planned Events Less Than or Equal 1 Hour AND <= 5,000 mcf
DATE TIME VOWMF m,CrRIGTinN nc lnirmcuT P. rAi ice ...T.......,�.�,. _. ....-.-___-..--
DATE
Unplanned Events < i Hour
Unplanned Events> 1 Hour
Planned Events < 1 hour and not
exceeding 5,000 MCF
Planned Events > 1 hour or
exceeding 5,000 MCF
Pilot Purge
Assist
TOTAL FLARED VOLUME
TOTAL
N
See Attachments
See Attachments
TOTAL 0
TOTAL
188
12,500
0
0
24,454
0
37,142
See Attachments
See Attachments
Page 8
3/13/2015
2:18 PM
Flare Start Date 02/01/2015
Flare End Date 02/28/2015
GC2 Flare Report
Total Volume (MSCFI 12688
Report
Numbe System Date StartTime Stop Time Duration Intermittent Black Smoke Planned Reported By Volume
u-22 Flare Relief 02/01/2015 5:00:00 pm 12:00:00 am 420 min No No No BP1\SQUIP2 5833
Determination Cause PWX dcs glitch took out whole facility in a stop production, had difficulty restarting LP & IP cpmmswm
Action Taken Secure well pads- restart production
15-23 Flare Relief 02/02/2015 12:00:00 am 80000am 480 min No No No BP1\SQUIP2 6667
Determination Cause Difficulty restartin LP and IP compressors after DCS induced stop production
Action Taken Minimized LP & IP production and restarted compressors as soon as available
Total Volume (MSCF) 12688
Generated 03/08/2015 2:03:09PM
Page 9 of 9
Hunt, Jennifer L (DOA)
From: AK, OPS PCC EOC TL <AKOPSPCCEOCTL@bp.com>
Sent: Friday, February 06, 2015 7:47 PM
To: Hunt, Jennifer L (DOA)
Cc: Loepp, Victoria T (DOA); Roby, David S (DOA); Castano, Alejandra; Benson, Gary A;
Arthur, Gregory; AK, HSSEE Env Adv West; Hauger, Wayne A; AK, OPS GC2 OSM; AK,
OPS GC2 Facility OTL; AK, OPS GC3&PCC OSM
Subject: Flaring Event atI
To: Jennifer Hunt, AOGCC CC: Dave Roby, AOGCC CC: Victoria Ferguson,
AOGCC
Lennifer.hunt(alalaska.gov dave.roby(cDalaska.aov victoria.ferousonnoalaska.q
ov
From: Jennifer Blake, GPB Production Optimization Team Leader
A flaring event occurred at GC2 starting at 01/30/2015 12:57 and stopping at 01/30/2015 13:40 with a volume of 8750
(MSCF). The event had a volume greater than 5000 (MSCF) and was due to high ambient temperature swings. Flaring
stopped when rate was cut.
A flaring event occurred at GC2 starting at 02/01/2015 17:00 and stopping at 02/02/2015 with a volume of 5833 (MSCF).
The event lasted for 420 minutes. The event had a volume greater than 5000 (MSCF) and was due to a Produced Water
Section control system glitch that shutdown the whole facility in a stop production and subsequent difficulty restarting the
LP & IP compressors. Flaring stopped when production was restarted with compressors back online.
A flaring event occurred at GC2 starting at 02/02/2015 00:00 and stopping at 02/02/2015 08:00 with a volume of 6667
(MSCF). The event lasted for 480 minutes. The event had a volume greater than 5000 (MSCF) and was due to a faulty
level transmitter that caused a modified stop production and subsequent difficult restarting the LP and IP
compressors. Flaring stopped when rate was cut and compressors restarted
Please let me know if you have any questions.
Thanks,
Jennifer Blake
PCC/EOC Production Optimization Team Lead
Office (907) 659-4472
Cell (907) 830-6204
Jennifer.blake@bp.com
STATE OF ALASKA
ALASKA OIL AND GAS CONSERVATION COMMISSION
FACILITY REPORT OF PRODUCED GAS DISPOSITION
1. Facility Number
0290000032
2. Facility Name
PBU GC 2
3. Field
PBU - WOA
4. Operator
BP
5. Month/Year of Disposition
I March -2015
Disposition
Volume MCF
20. Forproduction from multiple pools, list contribution of each pool as a percent of
Total Volume.
6. Sold
0
Pool Name Pool Code Percent
7. Reinjected
0
PRUDHOE 640150 89.97%
AURORA 64 1120 4130/
8. Flared or vented l hour or less
81
BOREALIS 640130 4.20%
ORION 640135 0.98%
9. Flared or vented more than 1 hour (see instr.)O
POLARIS 640160 0.72%
10. Pilot and Purge
27,621
11. Assist Gas
0
12. Fuel gas used in lease operations.
687,268
13. Other (see instructions)
Official Use Only
Authorization >1 hr:
Safety
MCF
14. TOTAL VOLUME (ITEMS 6-12)
714,970
Lease Use
MCF
15. NGL Gas Equivalent
0
Conservation
MCF
16. Purchased gas
p
Waste:
MCF
17. Transferred from-
0
18. Transferred to: (Express as a negative #) CGF
-18,359,486
Commissioner Date
19. Remarks:
I hereby certify that the foregoing is true and correct to the best of my knowledge.
Note: All volumes must be corrected
Signature ,-"17-- Title Manager Production Taxes and Royalties Alaska to pressure of 14.65 psia and to a
temperature of 60o F. Authority 20
Printed Name Diane Colley Phone (907) 564-5775 Date AAC25.235.
Form 10-422 Rev. 5/2009 INSTRUCTIONS ON REVERSE SIDE Submit in Duplicate
STATE OF ALASKA
ALASKA OIL AND GAS CONSERVATION COMMISSION
FACILITY REPORT OF PRODUCED GAS DISPOSITION
RECEIVED
MAY 14 2015
AOGCC
1. Facility Number
0290000032
2. Facility Name
PBU GC 2
3. Field
PBU - WOA
4. Operator •5.
BP
MonthNear of Disposition
I April -2015
Disposition
Volume MCF
20. For production from multiple pools, list contribution of each pool as a percent of
Total Volume.
6. Sold
�
Pool Name Poo[Code Percent
7. Reinjected
U
PRUDHOE 640150 91.69%
AURORA 640120 3.06%
8. Flared or vented 1 hour or less
7,000
BOREALIS 640130 3,81%
ORION 640135 0.81%
9. Flared or vented more than 1 hour (see instr.)
0
POLARIS 640160 0.639%
10. Pilot and Purge
28 920
11. Assist Gas
0
12. Fuel gas used in lease operations.
650,946
13. Other (see instructions)
6Official
Use Only
Authorization >1 hr:
Safety
MCF
14. TOTAL VOLUME (ITEMS 6-12)
686,866
Lease Use
MCF
15. NGL Gas Equivalent
0
Conservation
MCF
16. Purchased gas
Waste:
MCF
17. Transferred from:
0
Commissioner Date
18. Transferred to: (Express as a negative #) CGF
-21,644,192
19. Remarks:
I hereby certify that the foregoing is true and correct to the best of my knowledge.
Note: All volumes must be corrected
Signature /IX '�' 1 Title Manager Production Taxes and Ro alties Alaska to pressure of 14.65 psia and to a
_temperature of 60o F. Authority 20
Printed Name Diane Colley Phone (907) 564-5775 Date AAC25.235.
Form 10-422 Rev. 5/2009 INSTRUCTIONS ON REVERSE SIDE Submit in Duplicate
STATE OF ALASKA
ALASKA OIL AND GAS CONSERVATION COMMISSION
FACILITY REPORT OF PRODUCED GAS DIRP[11SiTinN
gECEIVE®
JUN 16 2015
AOGCC
1. Facility Number
0290000032
2. ility Name
PBUFacGC 2
3. Field
PBU - WOA
4. Operator •5.
BP
MonthNear of Disposition
May -2015
Disposition
Volume MCF
20. For production from multiple pools, list contribution of each pool as a percent of
Total Volume.
6. Sold
0
Pool Name Pool Cotle Percent
7. Reinjected
U
PRUDHOE 640150 92.80%
AURORA 640120 1.89%
8. Flared or vented 1 hour or less
13
BOREALIS 640130 4.03%,889
ORION 640135 0.77%
9. Flared or vented more than 1 hour (see instr.)573
POLARIS 640160 0.51%
10. Pilot and Purge
30,890
11. Assist Gas
0
12. Fuel gas used in lease operations.
557,686
13. Other (see instructions)
0
Official Use Only
Authorization >1 he
Safety
���
MCF
14. TOTAL VOLUME pTEM56.12)
603,038
Lease Use
MCF
15. NGL Gas Equivalent
Q
Conservation
MCF
16. Purchased gas
0
Waste.
MCF
17. Transferred from:
0
30-�7-3o-�S
18. Transferred to: (Express as a negative #) CGF
-18,396,185
Commissioner Date
19, Remarks:
I hereby certify that the foregoing is true and correct to the best of my knowledge.
/ ///Jyy1p Note: All volumes must be corrected
Signature ���"""((4 n. Title Manager Production Taxes and Royglties Alaska to pressure of 14.65 psia and to a
temperature of 60o F. Authority 20
Printed Name Diane Colley Phone (907) 564-5775 Date / AAC25.235.
Form 10-422 Rev, 512009 INSTRUCTIONS ON REVERSE SIDE Submit in Duplicate
BP EXPLORATION (ALASKA) INC.
PRUDHOE BAY UNIT- GC -2
GAS FLARING INCIDENT REPORT
May 2015
iimc VULUME DESCRIPTION OF INCIDENT & CAUSE
5/22/2015 1714-1810 3,889 Not required for unplanned events <= 1 hr
TOTAL 3,889
DESCRIPTION OF IN
See Attachments
EG1EIVED
JUN 16 2015 Paye 1
nt 2(%!i
ACTION TAKEN TO ELIMINATE CAUSE
Not required for unplanned events <= 1 hr
ACTION TAKEN TO E
See Attachments
6/15/2015
1:49 PM
TOTAL
0
Planned Events Less Than or Equal 1 Hour AND <= 5,000 mcf
DATE
TIME
VOLUME DESCRIPTION OF INCIDENT 8, CAUSE
ACTION TAKEN TO ELIMINATE CAUSE
5/16/2015
0424-0435
2,000 See Attachments
See Attachments
5/16/2015
2300-2355
8,000
TOTAL
10,000
Planned Events Exceeding 1 Hour OR > 5,000 mcf
DATE
TIME
VOLUME DESCRIPTION OF INCIDENT & CAUSE
ACTION TAKEN TO ELIMINATE CAUSE
5/24/2015
1510-1625
573 See Attachments
See Attachments
TOTAL
573
TOTAL
Unplanned Events < 1 Hour
3,889
Unplanned Events> 1 Hour
0
Planned Events < 1 hour and not
10,000
exceeding 5,000 MCF
Planned Events > 1 hour or
573
exceeding 5,000 MCF
Pilot Purge
30,890
Assist
0
TOTAL FLARED VOLUME
45,352
6/15/2015
1:49 PM
Flare Start Date 05/01/2015
Flare End Date 05/31/2015
GC2 Flare Report Total Volume (MSCF) 14462
Report
Numbs System
Date StartTime Stop Time Duration Intermittent
Black Smoke Planned Reported By
Volume
15-142 Flare Relief 05/16/2015 4:24:00 am 4.35:00 am 11 min No
No Yes BP1\WALLC7
2000
Determination Cause
De -pressured Dbankslug catcherformaint.
Action Taken
vessel was de -pressured
15-142 Flare Relief 05/16/2015 11:0000 pm 11:55:00 pm 55 min No
No Yes BPI\WALLC7
8000
Determination Cause
De -pressured J pad LDF thru D slug catcher for maint.
Action Taken
Reduced J pad LDF to flare pressure and closed Flare valve
Daily Volume (MSCF)
10000
15-151 Flare Relief 05/24/2015 3:10:00 pm 4:25:00 pm 75 min No No Yes BPI\FRANBD 573
Determination Cause Planned Water wash of K-7000 using coppus starting turbine.
Action Taken End of procedure.
Daily Volume (MSCF) 573
Total Volume (MSCF) 14462
RECEIVED
JUN 16 2015
AOGCC
Generated 05/08/2015 8:53:39AM Page 10 of 10
STATE OF ALASKA
ALASKA OIL AND GAS CONSERVATION COMMISSION
FACILITY REPORT OF PRODUCED GAS DISPOSITION
1. Facility Number
0290000032
2. Facility Name
PBU GC 2
3. Field
PBU - WOA
4. Operator
BP
5. MonthNear of Disposition
June -2015
Disposition
Volume MCF
20. For production from multiple pools, list contribution of each pool as a percent of
Total Volume.
6. Sold
0
Pool Name Pool Code Percent
7. Reinjected
0
PRUDHOE 640150 91.95%
AURORA 640120 3.230.
8. Flared or vented 1 hour or less
2 422
BOREALIS 640130 3.55%1,422
640135 0.77%
9. Flared or vented more than 1 hour (see instr.)
320
POLARIS .640160 0.50%
10. Pilot and Purge
28,820
11. Assist Gas
0
12. Fuel gas used in lease operations.
532,905
13. Other (see instructions)
0
Official Use Only
Authorization >1 hr:
Safety
3 z �
MCF
14. TOTAL VOLUME (ITEMS 6.12)
564,467
Lease Use
MCF
15. NGL Gas Equivalent
0
Conservation
MCF
16. Purchased gas
0
Waste:
MCF
17. Transferred from:
0
?-2
18. Transferred to: (Express as a negative #) CGF
-13,197,495
Commissioner Date
19. Remarks:
I hereby certify that the foregoing is true and correct to the best of my knowledge.
Note: All volumes must be corrected
Signature d Title Manager Production Taxes and R5yalties Alaska to pressure of 14.65 psis and to a
I temperature of 60o F. Authority 20
Gl
Printed Name Diane ColleyPhone (907) 564-5775 Data v AAC25.235.
VT f--
y�Z�lS-
Form 10-422 Rev. 5/2009 INSTRUCTIONS ON REVERSE SIDE Submit in Duplicate
BP EXPLORATION (ALASKA) INC.
PRUDHOE BAY UNIT- GC -2
GAS FLARING INCIDENT REPORT
June 2015
Page 13
Unplanned Events less than or equal to 1 hour
DATE TIME VOLUME DESCRIPTION OF INCIDENT & CAUSE ACTION TAKEN TO ELIMINATE CAUSE
6/30/2015 2206-2225 422 Not required for unplanned events <= 1 hr Not required for unplanned events <= 1 hr
TOTAL 422
unplanned Events greater than 1 hour
DATE TIME VOLUME DESCRIPTION OF INCIDENT & CAUSE ACTION TAKEN TO ELIMINATE CAUSE
See Attachments See Attachments
TOTAL 0
Planned Events Less Than or Equal 1 Hour AND <= 5,000 mcf
DATE TIME VOLUME DESCRIPTION OF INCIDENT & CAUSE ACTION TAKEN TO ELIMINATE CAUSE
6/1/2015 2200-2300 2,000 See Attachments See Attachments
TOTAL 2,000
6/27/2015
6/29/2015
Unplanned Events < 1 Hour
Unplanned Events> 1 Hour
Planned Events < 1 hour and not
exceeding 5,000 MCF
Planned Events > 1 hour or
exceeding 5,000 MCF
Pilot Purge
Assist
TOTAL FLARED VOLUME
2228-2329 160 See Attachments
2156-2310 160
TOTAL 320
TOTAL
422
0
2,000
320
28,820
0
31,562
ACTION TAKEN TO E
See Attachments
7/15/2015
3:53 PM
Flare StartDate 06/01/2015
Flare End Date 06/30/2015
GC2 Flare Report
Total Volume (MSCF) 2742
Report
Numbs System Date Start Time Stop Time Duration Intermittent Black Smoke Planned Reported By Volume
m-ioo Nara Keller 06/01/2015 10:00:00 pm 11:00:00 pm 60 min No No Yes BP1\GILLSJ 2000
Determination Cause Extended Flaring event occurred while awaiting GC operator/maintenance evaluation. D- Slug Catcher Depressure for PMP
Action Taken No response taken as this was deemed to be of short duration.
Daily Volume (MSCF) 2000
15-215 Flare Relief 06/27/2015 10:28:00 pm 11:29:00 pm 61 min No No Yes BP1\STYVJW 160
Determination Cause Planned J Pad Depressuring, for maintenancework.
Action Taken Done depressuring J -Pad
Daily Volume (MSCF) 160
15-221 Flare Relief 06/29/2015 9:56:00 pm 11:1000 pm 74 min No No Yes BP1\STYVJW 160
Determination Cause J -Pad depressurefor work on the pad.
Action Taken Done with depressure for J -pad
Daily Volume (MSCF) 160
Total Volume (MSCF) 2742
Generated 07/02/2015 3:52:31 PM Page 11 of 12
Hunt, Jennifer L (DOA)
From:
AK, OPS PCC EOC TL <AKOPSPCCEOCTL@bp.com>
Sent:
Monday, June 29, 2015 6:19 AM
To:
Hunt, Jennifer L (DOA)
Cc:
Loepp, Victoria T (DOA); Castano, Alejandra; Benson, Gary A; Arthur, Gregory, AK, OPS
GC3&PCC OSM; Borton, Kim; AK, HSSEE Env Adv West; AK, OPS GC2 Facility OTL; AK,
OPS GC2 OSM
Subject:
Flaring Event at GC2
To: Jennifer Hunt, AOGCC
CC: Victoria Loepp, AOGCC
iennifer.huntCc alaska.00v
Victoria. loepp(7aalaska.00v
From: Jennifer Blake, GPB Production Optimization Team Leader
A flaring event occurred at GC2 starting at 06/27/2015 22:28 and stopping at 06/27/2015 23:29 with a volume of 160
(MSCF). The event lasted for 61 minutes and was due to depressurizing J Pad for planned maintenance work. The event
stopped once de -pressured.
Thanks,
Jennifer Blake
PCC/EOC Production Optimization Team Lead (alt David Spall)
Office (907) 659-4472
Cell (907) 830-6204
Jennifer.blake@bp.com
Hunt, Jennifer L (DOA)
From: AK, OPS PCC EOC TL <AKOPSPCCEOCTL@bp.com>
Sent: Tuesday, June 30, 2015 8:45 AM
To: Hunt, Jennifer L (DOA)
Cc: Loepp, Victoria T (DOA); Castano, Alejandra; Benson, Gary A; Arthur, Gregory; AK, OPS
GC3&PCC OSM; Borton, Kim; AK, HSSEE Env Adv West; AK, OPS GC2 Facility OTL; AK,
OPS GC2 OSM
Subject: Flaring Event at GC2
To: Jennifer Hunt, AOGCC CC: Victoria Loepp, AOGCC
jenn ifer. hu ntCo?a laska.gov Victoria. loeppna.alaska. gov
From: Jennifer Blake, GPB Production Optimization Team Leader
A flaring event occurred at GC2 starting at 06/29/2015 21:56 and stopping at 06/29/2015 23:10 with a volume of 160
(MSCF). The event lasted for 74 minutes and was due to J -Pad depressure for maintenance work on the pad. The event
stopped when the depressurization was complete.
Thanks
Jennifer Blake
PCC/EOC Production Optimization Team Lead (alt David Spall)
Office (907) 659-4472
Cell (907) 830-6204
Jennifer.blakeC@bp.com
STATE OF ALASKA
ALASKA OIL AND GAS CONSERVATION COMMISSION
FACILITY REPORT OF PRODUCED GAS DISPOSITION
1. Facility Number
0290000032
2. Facility Name
PBU GC 2
3. Field
PBU - WOA
4. Operator
BP
5. MonthNear of Disposition
1 JUI -2015
Disposition
Volume MCF
20. For production from multiple pools, list contribution of each pool as a percent of
Total Volume.
6. Sold
0
Pool Name Pool Code Percent
7. ReinjectedD
PRUDHOE 640150 93.90%
AURORA 640120 2,09^/
8. Flared or vented 1 hour or less
U
BOREALIS 640130 2.94%
ORION 640135 0.68%
9. Flared or vented more than 1 hour (see insh.)
D
POLARIS 640160 0.397/0
10. Pilot and Purge
28,904
11. Assist Gas
U
12. Fuel gas used in lease operations.
635,716
13. Other (see instructions)
U
Official Use Only
Authorization >1 hr
Safety
MCF
14. TOTAL VOLUME (ITEMS 6-12)
664,620
Lease Use
MCF
15. NGL Gas Equivalent
U
Conservation
MCF
16. Purchased gas
U
Waste:
MCF
17. Transferred from:
0
18. Transferred to: (Express as a negative #) CGF-17,391,273
Commissioner Date
19. Remarks:
I hereby certify that the foregoing is true and correct to the best of my knowledge.
// !/Q »! Note: All volumes must be corrected
Signature E -1l 'f K Title Manager Production Taxes and Royal ies Alaska to pressure of 14.65 psis and to a
�/ i temperature of 60o F. Authority 20
Printed Name Diane ColleyPhone (907) 564-5775 Date b I AAC25.235.
Form 10-422 Rev. 512009 INSTRUCTIONS ON REVERSE SIDE Submit in Duplicate
STATE OF ALASKA
ALASKA OIL AND GAS CONSERVATION COMMISSION
FACILITY REPORT OF PRODUCED GAS DISPOSITION
1. Facility Number
0290000032
2. Facility Name
PBU GC 2
3. Field
PBU - WOA
4. Operator
BP I
5. MonthNear of Disposition
August -2015
Disposition
Volume MCF
20. For production from multiple pools, list contribution of each pool as a percent of
Total Volume.
6. Sold
Pool Name Pool Code Percent
7. Reinjected
O
PRUDHOE 640150 95.90°/
AURORA 640120 1.17%
8. Flared or vented 1 hour or less
2 ,083
BOREALIS 640130 2.23%
ORION 640135 0.47%
9. Flared or vented more than 1 hour (see instr.)
295
POLARIS 640160 0.23%
10. Pilot and Purge
24,921
11. Assist Gas
0
12. Fuel gas used in lease operations.
540,989
13. Other (see instructions)
0
Official Use Only
Authorization>1 hr:
Safety
2 q 5
MCF
14. TOTAL VOLUME (ITEMS 6.12)
568,288
Lease Use
MCF
15. NGL Gas Equivalent
0
Conservation
MCF
16. Purchased gas
0
Waste:
MCF
17. Transferred from:
0
_
5
Coffirnissioner Dale
18. Transferred to: (Express as a negative #) CGF
-17,717,148
19. Remarks:
I hereby certify that the foregoing is true
1 and correct to the best of my knowledge.
�LC�/ tt / 0) ,. Note: All volumes must be corrected
Signature litL�i'J�� Y) Tide Mana er Production Taxes and Ro alties Alaska to pressure of 14.65 psis and to a
temperature of 60o F. Authority 20
Printed Name Diane Colley Phone (907) 564-5775 Date LN� AAC25.235.
VT -1
Form 10-422 Rev. 5/2009 INSTRUCTIONS ON REVERSE SIDE Submit in Duplicate
8/14/2015
8/18/2015
BP EXPLORATION (ALASKA) INC.
PRUDHOE BAY UNIT - GC -2
GAS FLARING INCIDENT REPORT
August 2015
TIME VOLUME DESCRIPTION OF INCIDENT & CAUSE
1942-2008 1,264 Not required for unplanned events <= 1 hr
TOTAL 1,264
2151-2359
TOTAL
267 See Attachments
267
Page 9
Not required for unplanned events <= 1 hr
See Attachments
CAUSE
Planned Events Less Than or Equal 1 Hour AND <= 5,000 mcf
DATE TIME
VOLUME DESCRIPTION OF INCIDENT & CAUSE
ACTION TAKEN TO ELIMINATE CAUSE
8/29/2015 0801-0900
819 See Attachments
See Attachments
TOTAL
819
Planned Events Exceeding 1 Hour OR > 5,000 mcf
DATE TIME
VOLUME DESCRIPTION OF INCIDENT & CAUSE
ACTION TAKEN TO ELIMINATE CAUSE
8/18/2015 1630-2000
28 See Attachments
See Attachments
TOTAL
28
TOTAL
Unplanned Events < 1 Hour
1,264
Unplanned Events > 1 Hour
267
Planned Events < 1 hour and not
819
exceeding 5,000 MCF
Planned Events> 1 hour or
28
exceeding 5,000 MCF
Pilot Purge
24,921
Assist
0
TOTAL FLARED VOLUME
27,299
9/11/2015
10:38 AM
Flare StartDate 08/01/2015
Flare End Date 08/31/2015
GC2 Flare Report Total Volume (MSCF) 2378
Report
Numbs System
Date Start Time Stop Time Duration Intermittent
Black Smoke Planned Reported By
Volume
15-270 Flare Relief 08/18/2015 4:30:OOpm 8:00:00 pm 210 min No
No Yes BP1\PAOLINJM
28
Determination Cause
Depressure N -Pad to flare for shutdown work.
Action Taken
N -Pad depressured.
15-270 Flare Relief 08/18/2015 9:51:00 pm 11:59:00 pm 128 min Yes
No No BP1\PAOLINJM
287
Determination Cause
Flaring off of LP suction scrubber due to lack of gas to keep IP compressor happy causing LP to back pressure.
Action Taken
No response taken as this was deemed to be of short duration.
Daily Volume (MSCF)
295
15-287 Flare Relief 08/29/2015 8:01:00 am 9:00:00 am 59 min No
Determination Cause Used C bank to depressure S LDFduetoa leakwell pad.
Action Taken LDF deppressured to 0 psi and stopped flaring.
Generated 09/022015 9:47:02AM
No Yes BMSQUIP2 819
Daily Volume (MSCF) 819
Total Volume (MSCF) 2378
Page 9 of 10
Hunt, Jennifer L (DOA)
From: AK, OPS PCC EOC TL <AKOPSPCCEOCTL@bp.com>
Sent: Sunday, August 23, 2015 4:53 PM
To: Hunt, Jennifer L (DOA)
Cc: Loepp, Victoria T (DOA); Glover, Robin (SLR); Benson, Gary A; Arthur, Gregory; AK, OPS
GC3&PCC OSM; Borton, Kim; AK, HSSEE Env Adv West; AK, OPS GC2 Facility OTL; AK,
OPS GC2 OSM
Subject: Flaring Event atas
To: Jennifer Hunt, AOGCC CC: Victoria Loepp, AOGCC
ennifer.hunt(o)alaska oov Victoria. loeooCa alaska.00v
From: Jennifer Blake, GPB Production Optimization Team Leader
A flaring event occurred at GC2 starting at 08/18/2015 16:30 and stopping at 08/18/2015 20:00 with a volume of 28
(MSCF). The event lasted for 210 minutes and was due to N -Pad depressurization for maintenance work on the pad. The
event stopped when the depressurization was complete.
A flaring event occurred at GC2 starting at 08/18/2015 21:51 and stopping at 08/18/2015 23:59 with a volume of 267
(MSCF). The event lasted for 128 minutes and was due to flaring off the LP suction scrubber due to low gas rates due to
maintenance activities. The flaring did not continue into 8/19.
Thanks,
Jennifer Blake
PCC/ECC Production Optimization Team Lead (alt David Spall)
Office (907) 659-4472
Cell (907) 830-6204
Jennifer.blake@bo.com
STATE OF ALASKA
ALASKA OIL AND GAS CONSERVATION COMMISSION
FACILITY REPORT OF PROnuCFn roc nicpnc1T1nK1
-
L Facility Number 2. Facility Name
0290000032 PBU GC 2
Disposition
- - -
3. Field
PBU - WOA
Volume MCF
- -- -.._ _...... § I ..,..
4. Operator 5. MonlhNear of Disposition
BP September -2015
20. For production from multiple pools, list contribution of each pool as a percent of
Total Volume.
6. Sold
O
Pool Name Pool Code Percent
7. Reinjected
U
PRUDHOE 640150 94.02%
AURORA 640120 2.33%
8. Flaredorvented 1 hourorless
13,445BOREALIS
640130 2.52%
ORION 640135 0.87%
9. Flared or vented more than 1 hour (see instr.)
U
POLARIS 640160 0.26%
10. Pilot and Purge
26,532
-
11. Assist Gas
U
'
12. Fuel gas used in lease operations.
480,229
13. Other (see instructions)
U
Official Use Only
Authorization >1 hr:
Safety
MCF
14. TOTAL VOLUME (ITEMS 6-12)
520,206
Lease Use
MCF
15. NGL Gas Equivalent
0
Conservation
MCF
16. Purchased gas
U
Waste:
MCF
17. Transferred from:
U
Commissioner Dale
18. Transferred to: (Express as a negative #) CGF
-16,150,188
19, Remarks:
I hereby certify that the foregoing is true and correct to the best of my knowledge.
Signature W(� Note: All volumes must be corrected
Title Manager Production Taxes and Ro alties Alaska to pressure of 14.65 psia and to a
temperature of 60o F. Authority 20
Printed Name Diane Colley Phone (907) 564-5775 Date AAC25.235.
Form 10-422 Rev. 5/2009 INSTRUCTIONS ON REVERSE SIDE
Submit in Duplicate
BP EXPLORATION (ALASKA) INC.
PRUDHOE BAY UNIT - GC -2
GAS FLARING INCIDENT REPORT Page 8
September 2015
9/19/2015 I RJW yr 1NCIDENT & CAUSE ACTION TAKEN TO ELIMINATE CAUSE
2155-2251 12,056 Not required for unplanned events <= 1 hr Not required for unplanned events <= 1 hr
TOTAL 12,056
See Attachments
See Attachments
TOTAL 0
led Events Less Than or Equal 1 Hour AND <= 5,000 mcf
DATE TIME VOLUME DESCRIPTION OF INCIDENT & CAUSE
9/18/2015 0007-0047 1,389 See Attachments ACTIONTAKENTOs
See Attachments
TOTAL 1,389
ed Events Exceeding 1 Hour OR > 5,000 mcf
DATE TIME VOLUME DESCRIPTION OF INCIDENT & CAUSE
ACTION TAKEN TO EL
See Attachments See Attachments
TOTAL 0
Unplanned Events < 1 Hour
TOTAL
12,056
Unplanned Events> 1 Hour
0
Planned Events < 1 hour and not
exceeding 5,000 MCF
1,389
Planned Events > 1 hour or
exceeding 5,000 MCF
0
Pilot Purge
26,532
Assist
0
TOTAL FLARED VOLUME
39,977
10/15/2015
10:43 AM
Flare Start Date 09/01/2015
Flare End Date 09/30/2015
GC2 Flare Report
Total Volume (MSCF)
13445
Report
Numbs System Date StartTime
Stop Time Duration Intermittent
Black Smoke Planned Reported By
Volume
15-309 Flare Relief 09/18/2015 12:07:00 am
12:47:00 am 40 min No
No Yes BPIISQUIP2
1389
Determination Cause Depressunng R Pad through "C' bank Slugcetcher for scheduled work
Action Taken Finished depressure
Daily Volume (MSCF)
1389
Total Volume (MSCF)
13445
10/02/2015 2:48:30PM
Page 7 of 8
STATE OF ALASKA
ALASKA OIL AND GAS CONSERVATION COMMISSION
FACILITY REPORT OF PRODUCED GAS DISPOSITION
1. Facility Number
0290000032
2. Facility Name
PBU GC 2
3. Field
PBU - WOA
4. Operator
BP
5. MonthNear of Disposition
I October -2015
Disposition
Volume MCF
20. Forproduction from multiple pools, list contribution of each pool as a percent of
Total Volume.
6. Sold
0
Pool Name Pool Code Percent
7. Reinjected
0
PRUDHOE 640150 95.44°/
'
AURORA 640120 2.04%
8. Flared or vented 1 hour or less
968
BOREALIS 640130 1.45%
ORION 640135 0.67%
9. Flared or vented more than 1 hour (see insir.)
0
POLARIS 640160 0.403%
10. Pilot and Purge
32,897
,
11. Assist Gas
0
12. Fuel gas used in lease operations.
693,986
13. Other (see instructions)
0
Official Use Only
•
Authorization >1 hr:
Safety
MCF
14. TOTAL VOLUME (ITEMS 6-12)
727,851
Lease Use
MCF
15. NGL Gas Equivalent
0
Conservation
MCF
16. Purchased gas
0
Waste:
MCF
17. Transferred from:
0
-
Commissioner Date
18. Transferred to: (Express as a negative #) CGF
-18,961,558
19. Remarks:
I hereby certify that the foregoing is true and correct to the best of my knowledge.
6mi/ Note: All volumes must be corrected
Signature Title Mana er Production Taxes and Royalties Alaska to pressure of 14.65 psis and to a
/ ) temperature of 60o F. Authority 20
Printed Name Diane ColleyPhone (907) 564-5775 Date l� I ki AAC25.235.
Form 10-422 Rev. 5/2009 INSTRUCTIONS ON REVERSE SIDE Submit in Duplicate
BP EXPLORATION (ALASKA) INC.
PRUDHOE BAY UNIT - GC -2
GAS FLARING INCIDENT REPORT
October 2015
Page 10
Unplanned Events less than or equal to 1 hour
DATE TIME VOLUME. DESCRIPTION OF INCIDENT & CAUSE ACTION TAKEN TO ELIMINATE CAUSE
10/5/2015 1547-1600 135 Not required for unplanned events <= 1 hr Not required for unplanned events <= 1 hr
10/26/2015 2135-2145 69
10/27/2015 1341-1352 764
TOTAL 968
DATE
See Attachments
See Attachments
TOTAL 0
Planned Events Less Than or Equal 1 Hour AND <= 5,000 mcf
DATE TIME VOLUME DESCRIPTION OF INCIDENT & CAUSE ACTION TAKEN TO ELIMINATF rA11CF
TOTAL
DATE
TOTAL
Unplanned Events < 1 Hour
Unplanned Events> 1 Hour
Planned Events < 1 hour and not
exceeding 5,000 MCF
Planned Events > 1 hour or
exceeding 5,000 MCF
Pilot Purge
Assist
TOTAL FLARED VOLUME
See Attachments
0
9
TOTAL
968
0
0
0
32,897
0
33,865
See Attachments
See Attachments
See Attachments
11/16/2015
3:35 PM
Flare Start Date 10/01/2015
Flare End Date 10/31/2015
GC2 Flare Report
Total Volume (MSCF) 968
Report
Numbe System Date Start Time Stop Time Duration Intermittent Black Smoke Planned Reported By Volume
Total Volume (MSCF) 968
oenemlea TVUti/2015 3.2534PM Page 12 of 12
STATE OF ALASKA
ALASKA OIL AND GAS CONSERVATION COMMISSION
FACILITY REPORT OF PRODUCED roe rnSpnc1T1nti
1. Facility Number 2. Facility Name
0290000032 PBU GC 2
Disposition
33. Fi Id
VVOA
Volume MCF
4B.pOperator 5. MonthNear of Disposition
November -2015
20. For production from multiple pools, list contribution of each pool as a percent of
Total Volume.
6. Sold
°
Pool Name Pool Code Percent
7. Reinjected
°
PRUDHOE 640150 95.08%
AURORA 64 1120 2.43%
8. Flared or vented 1 hour or less
5,962
BOREALIS 640130 1.57%
ORION 640135 0.50%
9. Flared or vented more than 1 hour (see ins[r.)
2,133
POLARIS 640160 0.42/
10. Pilot and Purge
30,344
11, Assist Gas
0
12. Fuel gas used in lease operations.
715,761
13. Other (see instructions)
°
Official Use Only
Authorization >7 hr:
21-33
MCF
14. TOTAL VOLUME (ITEMS 6-12)Safety
754,200
Lease Use
MCF
15, NGL Gas Equivalent
°
Conservation
MCF
16. Purchased gas
°
Waste:
MCF
17. Transferred from.
D
Commissioner Dale
18. Transferred to. (Express as a negative #) CGF
-19,721,939
19. Remarks:
I hereby certify that the foregoing is true and correct to the best of my knowledge.
Signature �� Note: All volumes must be corrected
TitleMana er Production TaxesRies Alaska to pressure of 14.65 psia and to a
U temperature of 60o F. Authority 20
Printed Name Diane Colley Phone (907) 564-5775 Date AAC25.235.
I/T L
1/5-/16
Farm 10-422 Rev. 512009 INSTRUCTIONS ON REVERSE SIDE Submit in Duplicate
BP EXPLORATION (ALASKA) INC
PRUDHOE BAY UNIT - GC -2
11/7/2015 0909-1109
2,133 See Attachments
See Attachments
GAS FLARING INCIDENT REPORT Page 7
2,133
November 2015
tanned Events less than or equal to 1 hour
Planned Events Less Than or Equal 1 Hour AND <= 5,000 mcf
DATE
11/1/2015
TIME
VOLUME
DESCRIPTION OF INCIDENT & CAUSE ACTION TAKEN TO ELIMINATE CAUSE
DESCRIPTION OF INCIDENT & CAUSE
1256-1335
677
Not required for unplanned events <= 1 hr Not required for unplanned events <= 1 hr
11/5/2015
0605-0615
1,389
0
11/7/2015
0500-0522
112
11/17/2015
0503-0516
271
VOLUME
11/23/2015
1112-1145
3,438
11/24/2015
0110-0114
6
0
11/28/2015
1143-1153
69
TOTAL
TOTAL
5,962
5,962
11/7/2015 0909-1109
2,133 See Attachments
See Attachments
TOTAL
2,133
Planned Events Less Than or Equal 1 Hour AND <= 5,000 mcf
DATE TIME
VOLUME
DESCRIPTION OF INCIDENT & CAUSE
ACTION TAKEN TO ELIMINATE CAUSE
See Attachments
See Attachments
TOTAL
0
Planned Events Exceeding 1 Hour OR > 5,000 mcf
DATE TIME
VOLUME
DESCRIPTION OF INCIDENT & CAUSE
ACTION TAKEN TO ELIMINATE CAUSE
See Attachments
See Attachments
TOTAL
0
TOTAL
Unplanned Events < 1 Hour
5,962
Unplanned Events> 1 Hour
2,133
Planned Events <1 hour and not
0
exceeding 5,000 MCF
Planned Events > 1 hour or
0
exceeding 5,000 MCF
Pilot Purge
30,344
Assist
0
TOTAL FLARED VOLUME
38,439
12/15/2015
9:52 AM
Flare StartDate 11/01/2015
Flare End Date 11/30/2015
GC2 Flare Report
Total Volume (MSCF) 8095
Report
Numbe System Date Start Time Stop Time Duration Intermittent Black Smoke Planned Reported By Volume
15-376 Flare Relief 11/07/2015 90900 am 11:09:00 am 120 min No No No BP1\STYVJW 2133
Determination Cause IF compressor shut down because of a problem associated with troubleshooting of Lube oil system.
Action Taken K-207 IF compressor was restarted
Total Volume (MSCF) 8095
Generated 12/03/2015 4:18:41 PM Page 6 of 7
11/2012015
Flaring Event at GC2
Flaring Event at GC2
AK, OPS PCC EOC TL [AKOPSPCCEOCTL@bp.com]
Sent:Sunday, November 08, 2015 7:08 PM
To: AOGCC Reporting (DOA sponsored)
Cc: Loepp, Victoria T (DOA); Benson, Gary A [Gary.Benson@bp.com]; Arthur, Gregory [Gregory.Arthur@bp.com]; AK, OPS GC3&PCC
OSM [AKOPSGC3PCCOSM@BP.com]; Borton, Kim [Kim.Borton@bp.com]; AK, HSSEE Env Adv West
[AKHSSEEEnvAdvWest@bp.com]; AK, OPS GC2 Facility OTL [AK0PSGC2Facility0TL@bp.com]; Glover, Robin (SLR)
[Robin.Glover@bp.com]; AK, OPS GC2 OSM [AKOPSGC20SM@bp.com]
To: AOGCC Reporting CC: Victoria Loepp, AOGCC
Aomc reporting@alaska gov Victoda.loeoala alaska.gov
From: Jennifer Blake, GPB Production Optimization Team Leader
A flaring event occurred at GC2 starting at 11/07/2015 09:09 and stopping at 11/07/2015 11:09 with a
volume of 2133 (MSCF). The event lasted for 120 minutes and was due to an IP compressor shutdown as a
result of a problem associated with troubleshooting the Lube oil system. The event stopped when the IP
Compressor was restarted.
Thanks,
Jennifer Blake
PCC/EOC Production Optimization Team Lead (alt David Spall)
Office (907) 659-4472
Cell (907) 830-6204
Jennifer.blake@bp.com
https://webmaila.almka.gov/owa/?ae=Item&t=IPM.Note&id=RgAAAABKLne2zgP4SoMkepOhCxbSBwBUvQ964rjQTgYgn3632GdL AAAhhLyAABUvQ964rjQT... 1/1
STATE OF ALASKA
ALASKA OIL AND GAS CONSERVATION COMMISSION
FACILITY REPORT OF PRODUCED GAS DIRPnRITinN
1. Facility Number2.
0290000032
Facility Name
PBU GC 2
3. Field
PBU - WOA
4. Operator •5.
BP
Month/Year of Disposition
December -2015
Disposition
Volume MCF
20. For production from multiple pools, list contribution of each pool as a percent of
Total Volume.
6. SoldO
]Name Pool Code Percent
7. Reinjected
PRUDHOE 640150 94.63%
AURORA 640120 2.24%
8. Flared or vented 1 hour or less
0
BOREALIS 640130 2.02
ORION 640135 0.66%
9. Flared or vented more than 1 hour (see instr.)
300
POLARIS 640160 0.45%
10. Pilot and Purge
29,742
11, Assist Gas
0
12. Fuel gas used in lease operations.
669,762
13. Other (see instructions)
0
Official Use Only
Authorization >1 hr:
Safety
G fJ
MCF
14. TOTAL VOLUME (ITEMS 6-12)
699,804
Lease Use
MCF
15. NGL Gas Equivalent
0
Conservation
MCF
16. Purchased gas
Waste:
MCF
17. Transferred from:0
/�, / Z _ (r b
`Commissioner
18. Transferred to: (Express as a negative #) CGF
-21,171,738
Date
19. Remarks:
I hereby certify that the foregoing is true and correct to the best of my knowledge.
Note: All volumes must be corrected
Signature Title Manager Production Taxes and Ro allies Alaska to pressure of 14.65 psia and to a
temperature of 60o F. Authority 20
Printed Name Diane Colley Phone (907) 564-5775 Date ///[J-// ^ AAC25.235.
V, -F L-
2
_
2/1r,1f4
Form 10-422 Rev. 5/2009 INSTRUCTIONS ON REVERSE SIDE Submit in Duplicate
than or equal to 1
TOTAL
TIME
BP EXPLORATION (ALASKA) INC.
PRUDHOE BAY UNIT -GC -2
GAS FLARING INCIDENT REPORT
December 2015
Not required for unplanned events <= 1 hr
0
Not required for unplanned events <= 1 hr
- --- """•" ""^
— •^`•"° "^ u�. ALI ION TAKEN TO ELIMINATE CAUSE
See Attachments See Attachments
TOTAL 0
Planned Events Less Than or Equal 1 Hour AND <= 5.000 mcf
Page 8
1/14/2016
4:19 PM
See Attachments
See Attachments
TOTAL
0
Planned Events Exceeding 1 Hour OR > 5,000 mcf
DATE
12/22/2015
TIME
0413-0514
VOLUME DESCRIPTION OF INCIDENT&CAUSE
ACTION TAKENTO ELIMINATE CAUSE
300 See Attachments
See Attachments
TOTAL
300
TOTAL
Unplanned Events < 1 Hour
0
Unplanned Events> 1 Hour
0
Planned Events < 1 hour and not
0
exceeding 5,000 MCF
Planned Events> 1 hour or
300
exceeding 5,000 MCF
Pilot Purge
29,742
Assist
0
TOTAL FLARED VOLUME
30,042
Page 8
1/14/2016
4:19 PM
Flare Start Date 12/01/2015
Flare End Date 12/3112015
GC2 Flare Report Total Volume (MSCF) 300
Report
Numbe System Date Start Time Stop Time Duration Intermittent Black Smoke Planned Reported By Volume
15-411 Flare Relief 12/22/2015 4:13:00 am 5:14:00 am 61 min No No Yes BP1%LEGNJB 300
Determination Cause R -Pad De -pressured for pigging
Action Taken Stopped flaring after pig was loaded
Total Volume (MSCF) 300
Generated 01/08/2016 11:15:02AM Page 7 of 7
12/30/2015
RE: Flaring Event at GC2
RE: Flaring Event at GC2
AK, OPS PCC EOC TL [AKOPSPCCEOCTL@bp.com]
Sent:Sunday, December 27, 2015 12:59 PM
To: AOGCC Reporting (DOA sponsored)
Cc: Loepp, Victoria T (DOA); Glover, Robin (SLR) [Robin.Glover@bp.com]; Benson, Gary A [Gary.Benson@bp.com]; Arthur, Gregory
[Gregory.Arthur@bp.com]; AK, OPS GC3&PCC OSM [AKOPSGC3PCCOSM@BP.com]; Borton, Kim [Kim.Borton@bp.com]; AK,
HSSEE Env Adv West [AKHSSEEEnvAdvWest@bp.com]; AK, OPS GC2 Facility OTL [AKOPSGC2FacilityOTL@bp.com]; AK, OPS
GC2 OSM [AKOPSGC20SM@bp.com]; Boughton, Leslie A [Leslie.Boughton@bp.com]; Kain, Rachel B [Rachel.Kain@bp.com]
My apologizes. I am resubmitting due to using the old TO: Address.
From: AK, OPS PCC EOC TL
Sent: Sunday, December 27, 2015 12:58 PM
To: 'jennifer.hunt@alaska.gov'
Cc: 'Loepp, Victoria T (DOA) (victoria.loepp@alaska.gov)'; Glover, Robin (SLR); Benson, Gary A; Arthur, Gregory;
AK, OPS GC3&PCC OSM; Borton, Kim; AK, HSSEE Env Adv West; AK, OPS GC2 Facility OTL; AK, OPS GC2 OSM;
Boughton, Leslie A; Kain, Rachel B
Subject: Flaring Event at GC2
To: Jennifer Hunt, AOGCC CC: Victoria Loepp, AOGCC
iennifer.hunt@alaska Qov Victoria. loeope-alaska.aov
From: David Spall, GPB Production Optimization Team Leader
A flaring event occurred at GC2 starting at 12/22/2015 04:13 and stopping at 12/22/2015 05:14 with a volume of 300
(MSCF). The event lasted for 61 minutes and was due to R -Pad De -pressured for pigging. The event stopped flaring
after pig was loaded and wells were shut-in at R -Pad.
Thanks,
David Spall (Alternate—Jennifer Blake)
PCC/EOC Production Optimization Team Lead
907-659-4472 Office
219-689-4036 Cell
david.spall0bp.com
https://webm aila.alaska.gov/owa/?ae=Item &t=IPM.N ote&id= RgAAAABKLne2zgP4SoM kepOhC xbSBwBU vQ964rj QTgYgn3632GdIAAAAhhLyAABUvQ964rjQT... 1/1