Department of Commerce, Community, and Economic Development
Alaska Oil and Gas Conservation Commission
Loading...
HomeMy WebLinkAboutPBU GC 3 - BP Exploration (Alaska) Inc.State of Alaska AOGCC
Gas Disposition Files
Year: 2015
Facility: PBU GC 3
Operator: BP EXPLORATION (ALASKA) INC.
STATE OF ALASKA
ALASKA OIL AND GAS CONSERVATION COMMISSION
FACILITY REPORT OF PRODUCED GAS DISPOSITION
RECEIVED
FEB 19 2015
AOGCC
1. Facility Number
0290000033
2. Facility Name
PBU GC 3
3. Field
PBU - WOA
4. Operator
BP
5. Month/Year of Disposition
January -2015
Disposition
Volume MCF
20. For production from multiple pools, list contribution of each pool as a percent of
Total Volume.
6. Sold
0
Pool Name Pool Code Percent
7. Reinjected
0
8. Flared or vented 1 hour or less
0
9. Flared or vented more than 1 hour (see instr.)
0
10. Pilot and Purge
17,242
11. Assist Gas
0
12. Fuel gas used in lease operations.
527,373
13. Other (see instructions)
0
Official Use Only
Authorization >i hr
Safety
MCF
14. TOTAL VOLUME (ITEMS 6-12)
544,615
Lease Use
MCF
15. NGL Gas Equivalent
0
Conservation
MCF
16. Purchased gas
0
Waste:
MCF
17. Transferred from:
0
18. Transferred to: (Express as a negative #) CGF
-24,280,616
Commissioner Date
19. Remarks:
I hereby certify that the IONoing is true ago correct to the best of my knowledge.
UAq ^l� Note: All volumes must be corrected
Signature /I, Title Manager Production Taxes and Ro alties Alaska to pressure of 14.65 psis and to a
�C�-,/ temperature of 60o F. Authority 20
Printed Name Diane ColleyPhone (907) 564-5775 Date / bk AAC25.235.
Form 10-422 Rev. 5/2009 INSTRUCTIONS ON REVERSE SIDE Submit in Duplicate
STATE OF ALASKA
ALASKA OIL AND GAS CONSERVATION COMMISSION
FACILITY REPORT OF PRODUCED GAS DISPOSITION
1. Facility Number
0290000033
2. Facility Name
PBU GC 3
3. Field
PBU - WOA
4. Operator
BP
5. MonthNear of Disposition
I February -2015
Disposition
Volume MCF
20. For production from multiple pools, list contribution of each pool as a percent of
Total Volume.
6. Sold
0
Pool Name Pool Code Percent
7. Reinjected
0
8. Flared or vented 1 hour or less
0
9. Flared or vented more than 1 hour (see instr.)
0
10. Pilot and Purge
14,097
11. Assist Gas
0
12. Fuel gas used in lease operations.
469,885
13. Other (see instructions)
0
Official Use Only
Authorization >1 hr:
Safety
MCF
14. TOTAL VOLUME (ITEMS 6-12)
483,982
Lease Use
MCF
15. NGL Gas Equivalent
0
Conservation
MCF
16. Purchased gas
0
Waste:
MCF
17. Transferred from:
0
18. Transferred to: (Express as a negative #) CGF
-20,201,114
Commissioner Date
19. Remarks:
I hereby certify that the regoing is true and correct to the best of my knowledge.
�ta l a� Note: Ali volumes must be corrected
Signature "`mac- I Tine Mana er Production Taxes an Royalties Alaska to pressure of 14.65 psis and to a
/^ temperature of 60o F. Authority 20
Printed Name Diane Colley Phone (907) 564-5775 Date AAC25.235.
Form 10-422 Rev. 512009 INSTRUCTIONS ON REVERSE SIDE Submit in Duplicate
STATE OF ALASKA
ALASKA OIL AND GAS CONSERVATION COMMISSION
FACILITY REPORT OF PRODUCED GAS DISPOSITION
1. Facility Number
0290000033
2. Facility Name
PBU GC 3
3. Field
PBU - WOA
4. Operator
BP
5. Month/Year of Disposition
March -2015
Disposition
Volume MCF
20. For production from multiple pools, list contribution of each pool as a percent of
Total Volume.
6. Sold
0
Pool Name Pool Code Percent
7. Reinjected
0
8. Flared or vented 1 hour or less
0
9. Flared or vented more than 1 hour (see instr.)
0
10. Pilot and Purge
21,943
11. Assist Gas
0
12. Fuel gas used in lease operations.
527,904
13. Other (see instructions)
U
Official Use Only
Authorization >i hr.
Safety
MCF
14. TOTAL VOLUME (ITEMS 6.12)
549,847
Lease Use
MCF
15. NGL Gas Equivalent
U
Conservation
MCF
16. Purchased gas
p
Waste:
MCF
17. Transferred from:
0
Commissioner Date
18. Transferred to: (Express as a negative #) CGF
-25,675,623
19. Remarks:
1 hereby certify that the foregoing is true and correct to the best of my knowledge.
/q� /] //.'�1
Signature ' J { 't. / Title Manager Production Taxes and Royalties Alaska
Note: All volumes must be corrected
to pressure of 14.65 psis and to a
temperature of 60o F. Authority 20
AAC25.235.
Printed Name Diane Colley Phone (907) 564-5775 Date q
Form 10-422 Rev. 5/2009 INSTRUCTIONS ON REVERSE SIDE Submit in Duplicate
RECEIVED
STATE OF ALASKA MAY 14 2015
ALASKA OIL AND GAS CONSERVATION COMMISSION A®GCC
FACILITY REPORT OF PRODUCED GAS DISPOSITION
1. Facility Number
0290000033
2. Facility Name
PBU GC 3
3. Field
PBU - WOA
4. Operator
BP
5. Month year of Disposition
April -2015
Disposition
Volume MCF
20. For production from multiple pools, list contribution of each pool as a percent of
Total Volume.
6. Sold
0
Pool Name Pool Code Percent
7. Reinjected
0
8. Flared or vented 1 hour or less
0
9. Flared or vented more than 1 hour (see instr.)
6,970
10. Pilot and Purge
21,805
11, Assist Gas
0
12. Fuel gas used in lease operations.
484,015
13. Other (see instructions)
0
Official Use Only
Authorization >1 hr:
Safety
MCF
14. TOTAL VOLUME (ITEMS 6-12)
512,790
Lease Use
MCF
15. NGL Gas Equivalent
0
Conservation
MCF
16. Purchased gas
0
Waste:
MCF
17. Transferred from:
0
r
18. Transferred to: (Express as a negative #) CGF
-24,395,270
Commissioner Date
19. Remarks:
I hereby certify that th foregoing is true and correct to the best of my knowledge.
��p Note: All volumes must be corrected
Signature (A/t lL �� Title Maria er Production Taxes and Ro alties Alaska to pressure of 14.65 psis and to a
temperature of 60o F. Authority 20
Printed Name Diane Colley Phone (907) 564-5775 Date AAC25.235.
l'TL
�I/PwlIS
Form 10-422 Rev. 5/2009 INSTRUCTIONS ON REVERSE SIDE Submit in Duplicate
BP EXPLORATION (ALASKA) INC.
PRUDHOE BAY UNIT - GC -3
GAS FLARING INCIDENT REPORT
April 2015
RECEIVED
MAY 14 2015
Not required for unplanned events <= 1 hr Not required for unplanned events <= 1 hr
TOTAL 0
Unplanned Events greater than 1 hour
DATE TIME VOLUME DESCRIPTION OF INCIDENT & CAUSE ACTION TAKEN TO ELIMINATE CAUSE
See Attachments See Attachments
TOTAL 0
Planned Events Less Than or Equal 1 Hour AND <= 5,000 mcf
DATE TIME VOLUME DESCRIPTION OF INCIDENT & CAUSE ACTION TAKEN TO ELIMINATE CAUSE
See Attachments See Attachments
TOTAL
DATE TIME
4/6/2015 0000-0335
TOTAL
Unplanned Events < 1 Hour
Unplanned Events> 1 Hour
Planned Events < 1 hour and not
exceeding 5,000 MCF
Planned Events > 1 hour or
exceeding 5,000 MCF
Pilot Purge
Assist
TOTAL FLARED VOLUME
I
6,970 See Attachments See Attachments
TOTAL
0
0
0
6,970
21,805
0
28,775
Page 9
5/13/2015
1:24 PM
Flare StartDate 04/01/2015
Flare End Date 04/30/2015
GC3 Flare Report Total Volume (MSCF) 6970
Report
Numbe
System
Date Start Time
Stop Time
Duration Intermittent
Black Smoke Planned
Reported By Volume
15-99
Other
04/06/2015 12:00:00 am
3:35:00 am
215 min No
No Yes
BP1WRESD3 6970
Determination Cause LPS compressor K-7000 shut dawn and spin cool for water washing
Action Taken Spin cool completed
Daily Volume (MSCF) 6970
Total Volume (MSCF) 6970
RECEIVED
MAY 14 20b
A OGCV
Generated 05/08/2015 4:16:54PM Page 10 of 10
Hunt, Jennifer L (DOA)
From:
AK, OPS PCC EOC TL <AKOPSPCCEOCTL@bp.com>
Sent:
Monday, April 06,201S 7:18 PM
To:
Hunt, Jennifer L (DOA)
Cc:
Loepp, Victoria T (DOA); Castano, Alejandra; Benson, Gary A; Arthur, Gregory; AK, HSSEE
Env Adv West; Hauger, Wayne A; AK, OPS GC3&PCC OSM; AK, OPS GC3&PCC OSM; AK,
OPS GC3 Facility OTL
Subject:
Flaring Event at GC3
To: Jennifer Hunt, AOGCC CC: Victoria Ferguson, AOGCC
iennifer.hunt analaska.gov victoria.fergusonCa)alaska.00v
From: Jennifer Blake, GPB Production Optimization Team Leader
A flaring event occurred at GC3 starting at 04/06/2015 00:00 and stopping at 04/06/2015 03:35 with a volume of 6970
(MSCF). The event lasted for 215 minutes. The event had a volume greater than 5000 (MSCF) and was due a shutdown /
spin cool of LPS compressor K-7000 for planned maintenance. Flaring stopped when the spin cool was completed.
Please let me know if you have any questions.
Thanks,
Jennifer Blake
PCC/EOC Production Optimization Team Lead
Office (907) 659-4472
Cell (907) 830-6204
Jennifer.blake@bp.com
1
STATE OF ALASKA
ALASKA OIL AND GAS CONSERVATION COMMISSION
FACILITY REPORT OF PRODUCED GAS DISPOSITION
JUN 16 2015
,AOGCC
1. Facility Number
0290000033
2. Facility Name
PBU GC 3
3. Field
PBU - WOA
4. Operator
BP
5. MonthNear of Disposition
Ma -2015
Disposition
Volume MCF
20. For production from multiple pools, list contribution of each pool as a percent of
Total Volume.
6. Sold
0
Pool Name Pool Code Percent
7. Reinjected
0
8. Flared or vented 1 hour or less
0
9. Flared or vented more than 1 hour (see insfr.)
0
10. Pilot and Purge
23,200
11, Assist Gas
0
12. Fuel gas used in lease operations.
488,523
13. Other (see instructions)
0
Official Use Only
Authorization >1 hr:
Safety
MCF
14. TOTAL VOLUME (ITEMS 6-12)
511,723
Lease Use
MCF
15. NGL Gas Equivalent
0
Conservation
MCF
16. Purchased gas
0
Waste:
MCF
17. Transferred from:
0
18. Transferred to: (Express as a negative #) CGF
-24,969,892
Commissioner Date
19. Remarks:
I hereby certify that thLe foregoing is trye and correct to the best of my knowledge.
�(y/ Note: All volumes must be corrected
Signature Title Manager Production Taxes and Ro alties Alaska to pressure of 14.65 psia and to a
//� temperature of 60o F. Authority 20
Printed Name Diane ColleyPhone (907) 564-5775 Date V / AAC25. 235.
Form 10-422 Rev. 512009 INSTRUCTIONS ON REVERSE SIDE Submit in Duplicate
STATE OF ALASKA
ALASKA OIL AND GAS CONSERVATION COMMISSION
FACILITY REPORT OF PRODUCED GAS DISPOSITION
1. Facility Number
0290000033
2. Facility Name
PBU GC 3
3. Field
PBU - WOA
4. Operator
BP
5. MonthNear of Disposition
June -2015
Disposition
Volume MCF
20. For production from multiple pools, list contribution of each pool as a percent of
Total Volume.
6. Sold
Pool Name Pool Code Percent
7. Reinjected
0
8. Flared or vented 1 hour or less
0
9. Flared or vented more than 1 hour (see instr.)
25,062
10. Pilot and Purge
17,913
11. Assist Gas
0
12. Fuel gas used in lease operations.
461,025
13. Other (see instructions)
0
Official Use Only
Authorization >7 he
Safety
S/% ✓vi Z-
MCF
14.
14. TOTAL VOLUME (ITEMS 6-12)
504,000
Lease Use
MCF
15. NGL Gas Equivalent
U
Conservation
MCF
16. Purchased gas
p
Waste.
MCF
17. Transferred from:
0
n
9-2
18. Transferred to: (Express as a negative #) CGF
-21,008,269
Commissioner Date
19. Remarks:
I hereby certify that the foregoing is true and correct to the best of my knowledge.
Note: All volumes must be corrected
Signature Title Manager Production Taxes and Ro alties Alaska to pressure of 14.65 psis and to a
temperature of 60o F. Authority 20
Printed Name Diane Colley Phone (907) 564-5775 Date / AAC25.235.
lrT1—
Form 10-422 Rev. 512009 INSTRUCTIONS ON REVERSE SIDE Submit in Duplicate
BP EXPLORATION (ALASKA) INC.
PRUDHOE BAY UNIT- GC -3
GAS FLARING INCIDENT REPORT
June 2015
jUnplanned Events less than or equal to 1 hour
DATE TIME VOLUME DESCRIPTION OF INCIDENT & CAUSE ACTION TAKEN TO ELIMINATE CAUSE
Not required for unplanned events <= 1 hr Not required for unplanned events <= 1 hr
TOTAL 0
Unplanned Events greater than 1 hour
VOLUME DESCRIPTION OF IN(
See Attachments
TOTAL 0
Planned Events Less Than or Equal 1 Hour AND <= 5,000 mcf
DATE
6/12/2015
6/17/2015
TOTAL
0003-0358
1440-1610
TOTAL
Unplanned Events < 1 Hour
Unplanned Events> 1 Hour
Planned Events < 1 hour and not
exceeding 5,000 MCF
Planned Events > 1 hour or
exceeding 5,000 MCF
Pilot Purge
Assist
TOTAL FLARED VOLUME
DESCRIPTION OF INCIDENT &
See Attachments
0
VOLUME DESCRIPTION OF INI
1,000 See Attachments
24,062
25,062
TOTAL
0
0
0
25,062
17,913
0
42,975
ACTION TAKEN TO E
See Attachments
See Attachments
ACTION TAKEN TO ELIMINATE
See Attachments
Page 14
7/15/2015
3:53 PM
Flare Start Date 06/01/2015
Flare End Date 06/30/2015
GC3 Flare Report Total Volume (MSCF) 25062
Report
Numbs
System Date
Start Time
Stop Time
Duration Intermittent
Black Smoke Planned
Reported By Volume
15-187
Controlled Blowdown 06/12/2015
12:03:00 am
3:58:00 am
235 min No
No Yes
BP1\JACKSOW 1000
Determination Cause Controled blowdown of A -pad process piping to minimum pressure for pad maintenance
Actinn Taken Finished blowdown
Daily Volume (MSCF) 1000
15-196 Controlled Blowdown 06/17/2015 2:40:00 pm 4:10:00 pm 90 min No No Yes BP1\SPALLO 24062
Determination Cause Controled blowdown ofA-pad process piping to minimum pressure for pressure testing for leaks after repairs and a contingency plan in case
we had to depressure LDF due to leak.
Action Taken finished blow down
Daily Volume (MSCF) 24062
Total Volume (MSCF) 25062
Generated 07/02/2015 3:52:31 PM Page 12 of 12
Hunt, Jennifer L (DOA)
From: AK, OPS PCC EOC TL <AKOPSPCCEOCTL@bp.com>
Sent: Sunday, June 14, 2015 5:50 PM
To: Hunt, Jennifer L (DOA)
Cc: Loepp, Victoria T (DOA); Castano, Alejandra; Benson, Gary A; Arthur, Gregory, AK, OPS
GC3&PCG OSM; Borton, Kim; AK, OPS GC3 Facility OTL, AK, HSSEE Env Adv West
Subject: Flaring Event at
To: Jennifer Hunt, AOGCC CC: Victoria Loepp, AOGCC
ienniter.hunt(c alaska.gov Victoria. loeppna.alaska.gov
From: David Spall, GPB Production Optimization Team Leader
A flaring event occurred at GC3 starting at 06/12/2015 00:03 and stopping at 06/12/2015 03:58 with a volume of 1000
(MSCF). The event lasted for 235 minutes and was due to a controlled blowdown of A -Pad process piping to minimum
pressure for pad maintenance. The event stopped when the blowdown was finished.
Thanks
Dave
David Spall (Alternate —Jennifer Blake)
PCC/EOC Production Optimization Team Lead
907-659-4472 Office
219-689-4036 Cell
david.spall@bp.com
Hunt, Jennifer L (DOA)
From: AK, OPS PCC EOC TL <AKOPSPCCEOCTL@bp.com>
Sent: Friday, June 26, 2015 8:27 AM
To: Hunt, Jennifer L (DOA)
Cc: Loepp, Victoria T (DOA); Castano, Alejandra; Benson, Gary A; Arthur, Gregory; AK, OPS
GC3&PCC OSM; Borton, Kim; AK, OPS GC3 Facility OTL, AK, HSSEE Env Adv West
Subject: Flaring Event at GC3
To: Jennifer Hunt, AOGCC CC: Victoria Loepp, AOGCC
Tenn iter, h untCa7alaska.gov Victoria. loei)pr7a.a laska.gov
From: Jennifer Blake, GPB Production Optimization Team Leader
A flaring event occurred at GC3 starting at 06/17/2015 14:40 and stopping at 06/17/2015 16:10 with a volume of 24062
(MSCF). The event lasted for 90 minutes. The event had a volume greater than 5000 (MSCF) and was due to a controlled
blowdown of A -Pad process piping to minimum pressure for maintenance. The event stopped when the blowdown was
finished.
Thanks,
Jennifer Blake
PCC/EOC Production Optimization Team Lead (alt David Spall)
Office (907) 659-4472
Cell (907) 830-6204
Jennifer.blake@bp.com
STATE OF ALASKA
ALASKA OIL AND GAS CONSERVATION COMMISSION
FACILITY REPORT OF PRODUCED GAS DISPOSITION
1. Facility Number
0290000033
2. Facility Name
PBU GC 3
3. Field
PBU - WOA
4. Operator
BP
5. MonthNear of Disposition
I July -2015
Disposition
Volume MCF
20. For production from multiple pools, list contribution of each pool as a percent of
Total Volume.
6. Sold
0
Pool Name Pool Code Percent
7. Reinjected
0
8. Flared or vented 1 hour or less
0
9. Flared or vented more than 1 hour (see instr.)
0
10. Pilot and Purge
19,297
11. Assist Gas
0
12. Fuel gas used in lease operations.
500,500
13. Other (see instructions)
0
Official Use Only
Authorization >t hr:
Safety
MCF
14. TOTAL VOLUME (ITEMS 6-12)
519,797
Lease Use
MCF
15. NGL Gas Equivalent
Conservation
MCF
16. Purchased gas
Waste:
MCF
17. Transferred from:
0
18. Transferred to: (Express as a negative #) CGF
-25,556,495
Commissioner Date
19. Remarks:
I hereby certify that the foregoing is true and correct to the best of my knowledge.
/�/}�f/% Note: All volumes must be corrected
Signature writ —a�q Title Manager Production Taxes and Royalties Alaska to pressure of 14.65 psia and to a
% 7/ temperature of 60o F. Authority 20
Printed Name Diane ColleyPhone (907) 564-5775 Date AAC25.235.
Form 10-422 Rev. 5/2009 INSTRUCTIONS ON REVERSE SIDE Submit in Duplicate
STATE OF ALASKA
ALASKA OIL AND GAS CONSERVATION COMMISSION
FACILITY REPORT OF PRODUCED GAS DISPOSITION
1. Facility Number
0290000033
2. Facility Name
PBU GC 3
3. Field
PBU - WOA
4. Operator
BP
5. MonthNear of Disposition
August-2015N
u ust-2015
Disposition
Volume MCF
20. For production from multiple pools, list contribution of each pool as a percent of
Total Volume.
6. Sold
0
Pool Name Pool Code Percent
7. Reinjected
0
8. Flared or vented 1 hour or less
0
9. Flared or vented more than 1 hour (see instr.)
1,295
10. Pilot and Purge
18,833
11. Assist Gas
0
12. Fuel gas used in lease operations.
382,249
13. Other (see instructions)
U
Official use Only
Authorization>l hr:
Safety
/ 2 9s
MCF
14. TOTAL VOLUME (ITEMS 6-12)
402,377
Lease Use
MCF
15. NGL Gas Equivalent
0
Conservation
MCF
16. Purchased gas
U
Waste.
MCF
17. Transferred from:
0
18. Transferred to: (Express as a negative #) CGF
-22,847,759
Commissioner Dale
19. Remarks:
I hereby certify that t foregoing is true and correct to the best of my knowledge.
Signature Title Manager Production Taxes and Royalties Alaska
Printed Name Diane Colley Phone (907) 564-5775 Date
Note: All volumes must be corrected
to pressure of 14.65 psia and to a
temperature of 60o F. Authority 20
AAC25.235.
V T �--
�Z/24/! S
Form 10-422 Rev. 512009 INSTRUCTIONS ON REVERSE SIDE Submit in Duplicate
Events less than or equal to 1 hour
TOTAL
A
BP EXPLORATION (ALASKA) INC.
PRUDHOE BAY UNIT- GC -3
GAS FLARING INCIDENT REPORT
August 2015
Not required for unplanned events <= 1 hr
See Attachments
ACTION TAKEN TO ELIMINATE CAUSE
Not required for unplanned events <= 1 hr
See Attachments
TOTAL 0
Planned Events Less Than or Equal 1 Hour AND <= 5,000 mcf
DATE TIME VOLUME DESCRIPTION OF INCIDENT & CAUSE ACTION TAKEN TO ELIMINATE CAUSE
See Attachments See Attachments
Page 10
TOTAL
0
Planned Events Exceeding 1 Hour OR > 5,000 mcf
DATE TIME
VOLUME DESCRIPTION OF INCIDENT & CAUSE ACTION TAKEN TO ELIMINATE CAUSE
8/17/2015 1105-1235
385 See Attachments See Attachments
8/21/2015 0010-2346
910
TOTAL
1,295
TOTAL
Unplanned Events < 1 Hour
0
Unplanned Events> 1 Hour
0
Planned Events < 1 hour and not
0
exceeding 5,000 MCF
Planned Events > 1 hour or
1,295
exceeding 5,000 MCF
Pilot Purge
18,833
Assist
0
TOTAL FLARED VOLUME
20,128
9/11/2015
10:38 AM
Flare Start Date 08/01/2015
Flare End Date 08/31/2015
GC3 Flare Report Total Volume (MSCF) 1295
Report
Numbs System
Date StartTime Stop Time Duration Intermittent
Black Smoke Planned Reported By
Volume
15-268 Controlled Blowdown 08/17/2015 11:05:00 am 12:35:00 pm 90 min No
No Yes BP7\SPALLO
385
Determination Cause
The event was a controlled and planned blowdown of A -Pad process piping for repair of the A-49 Line and well pad SDV.
Action Taken
No response taken as this was deemed to be of short duration.
Daily Volume (MSCF)
385
15-275 Controlled Blowdown 08/21/2015 12:10:00 am 11:46:00 pm 1416 min Yes
No Yes BPI\PRESD3
910
Determination Cause
Shut GC3 down and flared off vessels to complete tar work.
Action Taken
Work completed for flaring
Daily Volume (MSCF)
910
Total Volume (MSCF) 1295
Generated 091022015 9:47:02AM Page 10 of 10
Hunt, Jennifer L (DOA)
From: AK, OPS PCC EOC TL <AKOPSPCCEOCTL@bp.com>
Sent: Tuesday, August 18, 2015 10:40 AM
To: Hunt, Jennifer L (DOA)
Cc: Loepp, Victoria T (DOA); Castano, Alejandra; Benson, Gary A; Arthur, Gregory; AK, OPS
GC3&PCC OSM; Borton, Kim; AK, HSSEE Env Adv West; AK, OPS GC3 Facility OTL; AK,
OPS GC3&PCC OSM
Subject: Flaring Event at
To: Jennifer Hunt, AOGCC CC: Victoria Loepp, AOGCC
iennifer.hunt(d)alaska.gov Victoria. loeppCa alaska.gov
From: Jennifer Blake, GPB Production Optimization Team Leader
A flaring event occurred at GC3 starting at 08/17/2015 11:05 and stopping at 08/17/2015 12:35 with a volume of 385
(MSCF). The event lasted for 90 minutes and was due to a controlled and planned blowdown of A -Pad process piping for
repair of the A-49 Line and well pad SDV. The event stopped when the blowdown was completed.
Thanks,
Jennifer Blake
PCC/EOC Production Optimization Team Lead (alt David Spall)
Office (907) 659-4472
Cell (907) 830-6204
Jennifer.blake@bp.com
Hunt, Jennifer L (DOA)
From: AK, OPS PCC EOC TL <AKOPSPCCEOCTL@bp.com>
Sent: Sunday, August 23, 2015 4:57 PM
To: Hunt, Jennifer L (DOA)
Cc: Loepp, Victoria T (DOA); Glover, Robin (SLR); Benson, Gary A; Arthur, Gregory; AK, OPS
GC3&PCC OSM; Borton, Kim; AK, HSSEE Env Adv West; AK, OPS GC3 Facility OTL
Subject: Flaring Event MUM
To: Jennifer Hunt, AOGCC CC: Victoria Loepp, AOGCC
lennifer.hunt(o)alaska.gov Victoria. loeppna alaska.00v
From: Jennifer Blake, GPB Production Optimization Team Leader
A flaring event occurred at GC3 starting at 08/21/2015 00:10 and stopping at 08/21/2015 23:46 with a volume of 910
(MSCF). The event lasted for 1416 minutes and was due to GC3 shutting down and flaring to complete TAR work. The
event stopped when the work was completed.
Thanks,
Jennifer Blake
PCC/EOC Production Optimization Team Lead (alt David Spall)
Office (907) 659-4472
Cell (907) 830-6204
lennifer.blakePbo.com
STATE OF ALASKA
ALASKA OIL AND GAS CONSERVATION COMMISSION
FACILITY REPORT OF PRODUCED r,ns ni.qpnciTinti
1. Facility Number 2. Facility Name
0290000033 PBU GC 3
Disposition
3. Field
PBU - WOA
Volume MCF
4. Operator 5. Month/Year of Disposition
BP I September -2015
20. For production from multiple pools, list contribution of each pool as a percent of
Total Volume.
6. Sold
0
Pool Name Pool Code Percent
7. Reinjected
p
8. Flared or vented 1 hour or less
535
'
9. Flared or vented more than 1 hour (see instr.)
0
10. Pilot and Purge
18,762
'
11. Assist Gas
0
12. Fuel gas used in lease operations.
426,211
13. Other (see instructions)
0
Offlrw Use Ordq
Authorization >1 hr:
Safety
MCF
14. TOTAL VOLUME (ITEMS 6-12)
445,508,
Lease Use
MCF
15, NGL Gas Equivalent
0
Conservation
MCF
16. Purchased gas
0
Waste:
MCF
17. Transferred from.
0
18. Transferred to: (Express as a negative #) CGF
-21,940,360
Commissioner Date
19, Remarks:
I hereby certify that foregoing is truecorrect to the best of my knowledge.
Signature jj1 Note: All volumes must be corrected
Title Mana er Production Taxes and Ro Ides Alaska to pressure of 14.65 psia and to a
D /- l temperature of 60o F. Authority 20
Printed Name Diane Colley Phone (907) 564-5775 Date / J AAC25.235.
Form 10-422 Rev. 512009 INSTRUCTIONS ON REVERSE SIDE Submit in Duplicate
BP EXPLORATION (ALASKA) INC.
PRUDHOE BAY UNIT - GC -3
GAS FLARING INCIDENT REPORT
September 2015
unplanned Events less than or equal to 1 hour
DATE TIMEVOLUME 535 Not required '�•^
DESCRIPTION OF INCIDENT &CAUSE ACTION TAKEN TO ELIMINATE CAUSE
9/22/2015 0310-0332 q red for unplanned events <= 1 hr Not required for unplanned events <= 1 hr
TOTAL 535
See Attachments
TOTAL
C
See Attachments
See Attachments See Attachments
TOTAL 0
See Attachments
TOTAL 0
See Attachments
Page 9
10/1512015
10:43 AM
TOTAL
Unplanned Events < 1 Hour
535
Unplanned Events> 1 Hour
0
Planned Events < 1 hour and not
0
exceeding 5,000 MCF
Planned Events> 1 hour or
0
exceeding 5,000 MCF
Pilot Purge
18,762
Assist
0
TOTAL FLARED VOLUME
19,297
See Attachments
Page 9
10/1512015
10:43 AM
Flare Start Date 08/01/2015
Flare End Date 09/30/2015
GC3 Flare Report Total Volume (MSCF) 535
Report
Numbe System Date Start Time Stop Time Duration Intermittent Black Smoke Planned Reported By Volume
Generated 10/02/2015 2.4830PM Page 8 of 8
STATE OF ALASKA
ALASKA OIL AND GAS CONSERVATION COMMISSION
FACILITY REPORT OF PRODUCED GAS DISPOSITION
1. Facility Number
0290000033
2. Facility Name
PBU GC 3
3. Field
PBU - WOA
4. Operator
BP
5. MonthNear of Disposition
I October -2015
Disposition
Volume MCF
20. Forproduction from multiple pools, list contribution of each pool as a percent of
Total Volume.
6. Sold
0
Pool Name Pool Code Percent.
7. Reinjected
0
8. Flared or vented 1 hour or less
U
.
9. Flared or vented more than 1 hour (see instr.)
0
,
10. Pilot and Purge
16,757
11. Assist Gas
.
12. Fuel gas used in lease operations.
472,060
13. Other (see instructions)
0
Official Use Only
�
.
Authorization >i hr:
Safety
MCF
14. TOTAL VOLUME (ITEMS 6-12)
488,817
Lease Use
MCF
15. NGL Gas Equivalent
0
Conservation
MCF
16. Purchased gas
0
Waste:
MCF
17. Transferred from:
0
Commissioner Date
18. Transferred to: (Express as a negative #) CGF
-21,319,260
19. Remarks:
I hereby certify that the foregoing is true and correct to the best of my knowledge.
Note: All volumes must be corrected
Signature Title Manager Production Taxes and Ro aloes Alaska to pressure of 14.65 psis and to a
temperature of 60o F. Authority 20
Printed Name Diane ColleyPhone (907) 564-5775 Date AAC25.235.
Form 10422 Rev. 5/2009 INSTRUCTIONS ON REVERSE SIDE Submit in Duplicate
BP EXPLORATION (ALASKA) INC.
PRUDHOE BAY UNIT - GC -3
GAS FLARING INCIDENT REPORT
October 2015
Not required for unplanned events <= 1 hr Not required for unplanned events <= 1 hr
TOTAL 0
Unplanned Events greater than 1 hour
DATE TIME VOLUME DESCRIPTION OF INCIDENT & CAUSE ACTION TAKEN TO ELIMINATE CAUSE
See Attachments See Attachments
TOTAL 0
DATE TIME VOLUME DESCRIPTION OF INCIDENT & CAUSE ACTION TAKEN TO ELIMINATE CAUSE
See Attachments See Attachments
TOTAL 0
Planned Events Exceeding 1 Hour OR > 5,000 mcf
DATE TIME VOLUME DESCRIPTION OF INCIDENT & CAUSE ACTION TAKEN TO ELIMINATE CAUSE
TOTAL
Unplanned Events < 1 Hour
Unplanned Events> 1 Hour
Planned Events < 1 hour and not
exceeding 5,000 MCF
Planned Events > 1 hour or
exceeding 5,000 MCF
Pilot Purge
Assist
TOTAL FLARED VOLUME
0
TOTAL
0
0
0
0
16,757
0
16,757
See Attachments
See Attachments
Page 11
11/16/2015
3:35 PM
STATE OF ALASKA
ALASKA OIL AND GAS CONSERVATION COMMISSION
FACILITY REPORT OF PROM iCFn rec nicunerrInAi
1. Facility Number 2. Facility Name
0290000033 PBU GC 3
Disposition
3. Field
PBU - WOA
Volume MCF
4. Operator 5. MonthNear of Disposition
BP November -2015
20. For production from multiple pools, list contribution or each pool as a percent of
Total Volume.
6. Sold
0
Pool Name Pool Code Percent
7. Reinjected
0
8. Flared or vented 1 hour or less
0
9. Flared or vented more than 1 hour (see instr)
761
10. Pilot and Purge
14,063
11. Assist Gas
0
12. Fuel gas used in lease operations.
501,689
13. Other (see instructions)
0Official
Use Only
Authorization >1 hr:
Safety
MCF
14. TOTAL VOLUME (ITEMS 6-12)
516,513
Lease Use
MCF
15. NGL Gas Equivalent
0
Conservation
MCF
16. Purchased gas
Waste:
MCF
17. Transferred from.
0
/
Commissioner Date
18. Transferred to: (Express as a negative #) CGF
-23,253,154
19. Remarks:
I hereby certify mat is foregoing is true and correct to the best of my knowledge.
Signature j a� 6w Note: All volumes must be corrected
Title Manager Production Taxes and Rgyalties Alaska to pressure of 14.65 psia and to a
temperature of 60o F. Authority 20
Printed Name Diane Colley Phone (907) 564-5775 Date AAC25.235.
VTt--
/s//G
Form 10-422 Rev. 5/2009 INSTRUCTIONS ON REVERSE SIDE
Submit in Duplicate
Events less than or equal to
TOTAL
7419
I
BP EXPLORATION (ALASKA) INC.
PRUDHOE BAY UNIT - GC -3
GAS FLARING INCIDENT REPORT
November 2015
Not required for unplanned events <= 1 hr
Not required for unplanned events <= 1 hr
See Attachments See Attachments
TOTAL 0
Planned Events Less Than or Equal 1 Hour AND <= 5.000 mcf
TOTAL
See Attachments
0
See Attachments
Page 8
iPlanned Events Exceeding 1 Hour OR > 5,000 mcf
DATE TIME
VOLUME DESCRIPTION OF INCIDENT & CAUSE ACTION TAKEN TO ELIMINATE CAUSE
11/27/2015 0001-1625
761 See Attachments See Attachments
TOTAL
761
TOTAL
Unplanned Events < 1 Hour
0
Unplanned Events> 1 Hour
0
Planned Events < 1 hour and not
0
exceeding 5,000 MCF
Planned Events > 1 hour or
761
exceeding 5,000 MCF
Pilot Purge
14,063
Assist
0
TOTAL FLARED VOLUME
14,824
12/15/2015
9:52 AM
Flare Start Date 11/01/2015
Flare End Date 11130/2015
GC3 Flare Report Total Volume (MSCF) 761
Report
Numbe System Date Start Time Stop Time Duration Intermittent Black Smoke Planned Reported By Volume
15-393 Controlled Blowdown 11/27/2015 12:01:00 am 4.25:00 pm 984 min No No Yes BP1\MOORDV 761
Determination Cause Depressured "A" pad flow lines for work performed on flow lines, and test separator valves.
Action Taken Equipment was restarted at 1625 hours.
Daily Volume (MSCF) 761
Total Volume (MSCF) 761
Generated 12/03/2015 4.18:41 PM Page 7 of 7
11/30/2015
Flaring Event at GC3
Flaring Event at GC3
AK, OPS PCC EOC TL [AKOPSPCCEOCTL@bp.com]
Sent:Monday, November 30, 2015 8:23 AM
To: AOGCC Reporting (DOA sponsored)
Cc: Loepp, Victoria T (DOA); Benson, Gary A [Gary.Benson@bp.com]; Arthur, Gregory [Gregory.Arthur@bp.com]; AK, OPS GC3&PCC
OSM [AKOPSGC3PCCOSM@BP.com]; Borton, Kim [Kim.Borton@bp.com]; AK, HSSEE Env Adv West
[AKHSSEEEnvAdvWest@bp.com]; Glover, Robin (SLR) [Robin.Glover@bp.com]; AK, OPS GO Facility OTL
[AKOPSGC3Faci IityOTL@bp.com]
To: AOGCC Reporting CC: Victoria Loepp, AOGCC
Aoacc.reoortina@alaska.aov Victoria.loepofaDalaska.aov
From: David Spall, GPB Production Optimization Team Leader
A flaring event occurred at GC3 starting at 11/27/2015 00:01 and stopping at 11/27/2015 16:25 with a volume of 761
(MSCF). The event lasted for 984 minutes and was due to De -pressured "A" pad flow lines for work performed on
flow lines, and test separator valves. The event stopped when "A" Pad flow tines were de -pressured and work was
completed.
Thanks
David Spall (Alternate—Jennifer Blake)
PCC/EOC Production Optimization Team Lead
907-659-4472 Office
219-689-4036 Cell
david.spall@bp.com
https://webmai la.alaska.gov/owat?ae=ltem &t= IPM .Note&id=RgAAAABKLne2zgP4SoM kepOhCxbSBw BUvQ964rjQTgYgn3632GdIAAAAhhLyAABUvQ964rjQT... 1/1
STATE OF ALASKA
ALASKA OIL AND GAS CONSERVATION COMMISSION
FACILITY REPORT OF PRODUCED GAS DISPOSITION
1. Facility Number
0290000033
2. Facility Name
PBU GC 3
3. Field
PBU - WOA
4. Operator
BP
5. MonthNear of Disposition
December -2015
Disposition
Volume MCF
20. For production from multiple pools, list contribution of each pool as a percent of
Total Volume.
6. Sold
0
Pool Name Pool Code Percent
7. Reinjected
0
8. Flared or vented 1 hour or less
0
9. Flared or vented more than 1 hour (see instr.)
0
10. Pilot and Purge
17,184
11. Assist Gas
0
12. Fuel gas used in lease operations.
531,711
13. Other (see instructions)
Q
Official Use Only
Authorization >1 hr:
Safety
MCF
14. TOTAL VOLUME (ITEMS 6-12)
548,895
Lease Use
MCF
15. NGL Gas Equivalent
0
Conservation
MCF
16. Purchased gas
0
Waste:
MCF
17. Transferred from:
0
18. Transferred to: (Express as a negative #) CGF
-23,146,521
Commissioner Date
19. Remarks:
I hereby certify that the foregoing is true and correct to the best of my knowledge.
//,t/�,�
Signature ��(�t�"h I�' i�t'c'�C1 Title Manager Production Taxes and R allies Alaska
Note: All volumes must be corrected
to pressure of 14.65 psia and to a
temperature of 60o F. Authority 20
AAC25.235.
Printed Name Diane Colley Phone (907) 564-5775 Dale /
W
Form 10-422 Rev. 5/2009 INSTRUCTIONS ON REVERSE SIDE Submit in Duplicate
Events less than or equal to 1 hour
TOTAL
BP EXPLORATION (ALASKA) INC.
PRUDHOE BAY UNIT - GC -3
GAS FLARING INCIDENT REPORT
December 2015
Not required for unplanned events <= 1 hr
0
DESCRIPTION OF [Ni
See Attachments
ACTION TAKEN TO ELIMINATE CAUSE
Not required for unplanned events <= 1 hr
See Attachments
TOTAL 0
Planned Events Less Than or Equal 1 Hour AND <= 5,000 mcf
DATE TIME VOLUME DESCRIPTION OF INCIDENT & CAUSE ACTION TAKEN TO ELIMINATE CAUSE
See Attachments See Attachments
TOTAL 0
Planned Events Exceeding 1 Hour OR > 5.000 mcf
DATE
TOTAL
Unplanned Events < 1 Hour
Unplanned Events> 1 Hour
Planned Events < 1 hour and not
exceeding 5,000 MCF
Planned Events > 1 hour or
exceeding 5,000 MCF
Pilot Purge
Assist
TOTAL FLARED VOLUME
See Attachments
0
TOTAL
0
0
0
0
17,184
0
17,184
ACTION TAKEN TO E
See Attachments
Page 9
1/14/2016
4:19 PM