Alaska Logo
Department of Commerce, Community, and Economic Development
Alaska Oil and Gas Conservation
Commission
Loading...
HomeMy WebLinkAboutPBU GC 3 - BP Exploration (Alaska) Inc.State of Alaska AOGCC Gas Disposition Files Year: 2015 Facility: PBU GC 3 Operator: BP EXPLORATION (ALASKA) INC.     STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMMISSION FACILITY REPORT OF PRODUCED GAS DISPOSITION RECEIVED FEB 19 2015 AOGCC 1. Facility Number 0290000033 2. Facility Name PBU GC 3 3. Field PBU - WOA 4. Operator BP 5. Month/Year of Disposition January -2015 Disposition Volume MCF 20. For production from multiple pools, list contribution of each pool as a percent of Total Volume. 6. Sold 0 Pool Name Pool Code Percent 7. Reinjected 0 8. Flared or vented 1 hour or less 0 9. Flared or vented more than 1 hour (see instr.) 0 10. Pilot and Purge 17,242 11. Assist Gas 0 12. Fuel gas used in lease operations. 527,373 13. Other (see instructions) 0 Official Use Only Authorization >i hr Safety MCF 14. TOTAL VOLUME (ITEMS 6-12) 544,615 Lease Use MCF 15. NGL Gas Equivalent 0 Conservation MCF 16. Purchased gas 0 Waste: MCF 17. Transferred from: 0 18. Transferred to: (Express as a negative #) CGF -24,280,616 Commissioner Date 19. Remarks: I hereby certify that the IONoing is true ago correct to the best of my knowledge. UAq ^l� Note: All volumes must be corrected Signature /I, Title Manager Production Taxes and Ro alties Alaska to pressure of 14.65 psis and to a �C�-,/ temperature of 60o F. Authority 20 Printed Name Diane ColleyPhone (907) 564-5775 Date / bk AAC25.235. Form 10-422 Rev. 5/2009 INSTRUCTIONS ON REVERSE SIDE Submit in Duplicate STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMMISSION FACILITY REPORT OF PRODUCED GAS DISPOSITION 1. Facility Number 0290000033 2. Facility Name PBU GC 3 3. Field PBU - WOA 4. Operator BP 5. MonthNear of Disposition I February -2015 Disposition Volume MCF 20. For production from multiple pools, list contribution of each pool as a percent of Total Volume. 6. Sold 0 Pool Name Pool Code Percent 7. Reinjected 0 8. Flared or vented 1 hour or less 0 9. Flared or vented more than 1 hour (see instr.) 0 10. Pilot and Purge 14,097 11. Assist Gas 0 12. Fuel gas used in lease operations. 469,885 13. Other (see instructions) 0 Official Use Only Authorization >1 hr: Safety MCF 14. TOTAL VOLUME (ITEMS 6-12) 483,982 Lease Use MCF 15. NGL Gas Equivalent 0 Conservation MCF 16. Purchased gas 0 Waste: MCF 17. Transferred from: 0 18. Transferred to: (Express as a negative #) CGF -20,201,114 Commissioner Date 19. Remarks: I hereby certify that the regoing is true and correct to the best of my knowledge. �ta l a� Note: Ali volumes must be corrected Signature "`mac- I Tine Mana er Production Taxes an Royalties Alaska to pressure of 14.65 psis and to a /^ temperature of 60o F. Authority 20 Printed Name Diane Colley Phone (907) 564-5775 Date AAC25.235. Form 10-422 Rev. 512009 INSTRUCTIONS ON REVERSE SIDE Submit in Duplicate STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMMISSION FACILITY REPORT OF PRODUCED GAS DISPOSITION 1. Facility Number 0290000033 2. Facility Name PBU GC 3 3. Field PBU - WOA 4. Operator BP 5. Month/Year of Disposition March -2015 Disposition Volume MCF 20. For production from multiple pools, list contribution of each pool as a percent of Total Volume. 6. Sold 0 Pool Name Pool Code Percent 7. Reinjected 0 8. Flared or vented 1 hour or less 0 9. Flared or vented more than 1 hour (see instr.) 0 10. Pilot and Purge 21,943 11. Assist Gas 0 12. Fuel gas used in lease operations. 527,904 13. Other (see instructions) U Official Use Only Authorization >i hr. Safety MCF 14. TOTAL VOLUME (ITEMS 6.12) 549,847 Lease Use MCF 15. NGL Gas Equivalent U Conservation MCF 16. Purchased gas p Waste: MCF 17. Transferred from: 0 Commissioner Date 18. Transferred to: (Express as a negative #) CGF -25,675,623 19. Remarks: 1 hereby certify that the foregoing is true and correct to the best of my knowledge. /q� /] //.'�1 Signature ' J { 't. / Title Manager Production Taxes and Royalties Alaska Note: All volumes must be corrected to pressure of 14.65 psis and to a temperature of 60o F. Authority 20 AAC25.235. Printed Name Diane Colley Phone (907) 564-5775 Date q Form 10-422 Rev. 5/2009 INSTRUCTIONS ON REVERSE SIDE Submit in Duplicate RECEIVED STATE OF ALASKA MAY 14 2015 ALASKA OIL AND GAS CONSERVATION COMMISSION A®GCC FACILITY REPORT OF PRODUCED GAS DISPOSITION 1. Facility Number 0290000033 2. Facility Name PBU GC 3 3. Field PBU - WOA 4. Operator BP 5. Month year of Disposition April -2015 Disposition Volume MCF 20. For production from multiple pools, list contribution of each pool as a percent of Total Volume. 6. Sold 0 Pool Name Pool Code Percent 7. Reinjected 0 8. Flared or vented 1 hour or less 0 9. Flared or vented more than 1 hour (see instr.) 6,970 10. Pilot and Purge 21,805 11, Assist Gas 0 12. Fuel gas used in lease operations. 484,015 13. Other (see instructions) 0 Official Use Only Authorization >1 hr: Safety MCF 14. TOTAL VOLUME (ITEMS 6-12) 512,790 Lease Use MCF 15. NGL Gas Equivalent 0 Conservation MCF 16. Purchased gas 0 Waste: MCF 17. Transferred from: 0 r 18. Transferred to: (Express as a negative #) CGF -24,395,270 Commissioner Date 19. Remarks: I hereby certify that th foregoing is true and correct to the best of my knowledge. ��p Note: All volumes must be corrected Signature (A/t lL �� Title Maria er Production Taxes and Ro alties Alaska to pressure of 14.65 psis and to a temperature of 60o F. Authority 20 Printed Name Diane Colley Phone (907) 564-5775 Date AAC25.235. l'TL �I/PwlIS Form 10-422 Rev. 5/2009 INSTRUCTIONS ON REVERSE SIDE Submit in Duplicate BP EXPLORATION (ALASKA) INC. PRUDHOE BAY UNIT - GC -3 GAS FLARING INCIDENT REPORT April 2015 RECEIVED MAY 14 2015 Not required for unplanned events <= 1 hr Not required for unplanned events <= 1 hr TOTAL 0 Unplanned Events greater than 1 hour DATE TIME VOLUME DESCRIPTION OF INCIDENT & CAUSE ACTION TAKEN TO ELIMINATE CAUSE See Attachments See Attachments TOTAL 0 Planned Events Less Than or Equal 1 Hour AND <= 5,000 mcf DATE TIME VOLUME DESCRIPTION OF INCIDENT & CAUSE ACTION TAKEN TO ELIMINATE CAUSE See Attachments See Attachments TOTAL DATE TIME 4/6/2015 0000-0335 TOTAL Unplanned Events < 1 Hour Unplanned Events> 1 Hour Planned Events < 1 hour and not exceeding 5,000 MCF Planned Events > 1 hour or exceeding 5,000 MCF Pilot Purge Assist TOTAL FLARED VOLUME I 6,970 See Attachments See Attachments TOTAL 0 0 0 6,970 21,805 0 28,775 Page 9 5/13/2015 1:24 PM Flare StartDate 04/01/2015 Flare End Date 04/30/2015 GC3 Flare Report Total Volume (MSCF) 6970 Report Numbe System Date Start Time Stop Time Duration Intermittent Black Smoke Planned Reported By Volume 15-99 Other 04/06/2015 12:00:00 am 3:35:00 am 215 min No No Yes BP1WRESD3 6970 Determination Cause LPS compressor K-7000 shut dawn and spin cool for water washing Action Taken Spin cool completed Daily Volume (MSCF) 6970 Total Volume (MSCF) 6970 RECEIVED MAY 14 20b A OGCV Generated 05/08/2015 4:16:54PM Page 10 of 10 Hunt, Jennifer L (DOA) From: AK, OPS PCC EOC TL <AKOPSPCCEOCTL@bp.com> Sent: Monday, April 06,201S 7:18 PM To: Hunt, Jennifer L (DOA) Cc: Loepp, Victoria T (DOA); Castano, Alejandra; Benson, Gary A; Arthur, Gregory; AK, HSSEE Env Adv West; Hauger, Wayne A; AK, OPS GC3&PCC OSM; AK, OPS GC3&PCC OSM; AK, OPS GC3 Facility OTL Subject: Flaring Event at GC3 To: Jennifer Hunt, AOGCC CC: Victoria Ferguson, AOGCC iennifer.hunt analaska.gov victoria.fergusonCa)alaska.00v From: Jennifer Blake, GPB Production Optimization Team Leader A flaring event occurred at GC3 starting at 04/06/2015 00:00 and stopping at 04/06/2015 03:35 with a volume of 6970 (MSCF). The event lasted for 215 minutes. The event had a volume greater than 5000 (MSCF) and was due a shutdown / spin cool of LPS compressor K-7000 for planned maintenance. Flaring stopped when the spin cool was completed. Please let me know if you have any questions. Thanks, Jennifer Blake PCC/EOC Production Optimization Team Lead Office (907) 659-4472 Cell (907) 830-6204 Jennifer.blake@bp.com 1 STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMMISSION FACILITY REPORT OF PRODUCED GAS DISPOSITION JUN 16 2015 ,AOGCC 1. Facility Number 0290000033 2. Facility Name PBU GC 3 3. Field PBU - WOA 4. Operator BP 5. MonthNear of Disposition Ma -2015 Disposition Volume MCF 20. For production from multiple pools, list contribution of each pool as a percent of Total Volume. 6. Sold 0 Pool Name Pool Code Percent 7. Reinjected 0 8. Flared or vented 1 hour or less 0 9. Flared or vented more than 1 hour (see insfr.) 0 10. Pilot and Purge 23,200 11, Assist Gas 0 12. Fuel gas used in lease operations. 488,523 13. Other (see instructions) 0 Official Use Only Authorization >1 hr: Safety MCF 14. TOTAL VOLUME (ITEMS 6-12) 511,723 Lease Use MCF 15. NGL Gas Equivalent 0 Conservation MCF 16. Purchased gas 0 Waste: MCF 17. Transferred from: 0 18. Transferred to: (Express as a negative #) CGF -24,969,892 Commissioner Date 19. Remarks: I hereby certify that thLe foregoing is trye and correct to the best of my knowledge. �(y/ Note: All volumes must be corrected Signature Title Manager Production Taxes and Ro alties Alaska to pressure of 14.65 psia and to a //� temperature of 60o F. Authority 20 Printed Name Diane ColleyPhone (907) 564-5775 Date V / AAC25. 235. Form 10-422 Rev. 512009 INSTRUCTIONS ON REVERSE SIDE Submit in Duplicate STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMMISSION FACILITY REPORT OF PRODUCED GAS DISPOSITION 1. Facility Number 0290000033 2. Facility Name PBU GC 3 3. Field PBU - WOA 4. Operator BP 5. MonthNear of Disposition June -2015 Disposition Volume MCF 20. For production from multiple pools, list contribution of each pool as a percent of Total Volume. 6. Sold Pool Name Pool Code Percent 7. Reinjected 0 8. Flared or vented 1 hour or less 0 9. Flared or vented more than 1 hour (see instr.) 25,062 10. Pilot and Purge 17,913 11. Assist Gas 0 12. Fuel gas used in lease operations. 461,025 13. Other (see instructions) 0 Official Use Only Authorization >7 he Safety S/% ✓vi Z- MCF 14. 14. TOTAL VOLUME (ITEMS 6-12) 504,000 Lease Use MCF 15. NGL Gas Equivalent U Conservation MCF 16. Purchased gas p Waste. MCF 17. Transferred from: 0 n 9-2 18. Transferred to: (Express as a negative #) CGF -21,008,269 Commissioner Date 19. Remarks: I hereby certify that the foregoing is true and correct to the best of my knowledge. Note: All volumes must be corrected Signature Title Manager Production Taxes and Ro alties Alaska to pressure of 14.65 psis and to a temperature of 60o F. Authority 20 Printed Name Diane Colley Phone (907) 564-5775 Date / AAC25.235. lrT1— Form 10-422 Rev. 512009 INSTRUCTIONS ON REVERSE SIDE Submit in Duplicate BP EXPLORATION (ALASKA) INC. PRUDHOE BAY UNIT- GC -3 GAS FLARING INCIDENT REPORT June 2015 jUnplanned Events less than or equal to 1 hour DATE TIME VOLUME DESCRIPTION OF INCIDENT & CAUSE ACTION TAKEN TO ELIMINATE CAUSE Not required for unplanned events <= 1 hr Not required for unplanned events <= 1 hr TOTAL 0 Unplanned Events greater than 1 hour VOLUME DESCRIPTION OF IN( See Attachments TOTAL 0 Planned Events Less Than or Equal 1 Hour AND <= 5,000 mcf DATE 6/12/2015 6/17/2015 TOTAL 0003-0358 1440-1610 TOTAL Unplanned Events < 1 Hour Unplanned Events> 1 Hour Planned Events < 1 hour and not exceeding 5,000 MCF Planned Events > 1 hour or exceeding 5,000 MCF Pilot Purge Assist TOTAL FLARED VOLUME DESCRIPTION OF INCIDENT & See Attachments 0 VOLUME DESCRIPTION OF INI 1,000 See Attachments 24,062 25,062 TOTAL 0 0 0 25,062 17,913 0 42,975 ACTION TAKEN TO E See Attachments See Attachments ACTION TAKEN TO ELIMINATE See Attachments Page 14 7/15/2015 3:53 PM Flare Start Date 06/01/2015 Flare End Date 06/30/2015 GC3 Flare Report Total Volume (MSCF) 25062 Report Numbs System Date Start Time Stop Time Duration Intermittent Black Smoke Planned Reported By Volume 15-187 Controlled Blowdown 06/12/2015 12:03:00 am 3:58:00 am 235 min No No Yes BP1\JACKSOW 1000 Determination Cause Controled blowdown of A -pad process piping to minimum pressure for pad maintenance Actinn Taken Finished blowdown Daily Volume (MSCF) 1000 15-196 Controlled Blowdown 06/17/2015 2:40:00 pm 4:10:00 pm 90 min No No Yes BP1\SPALLO 24062 Determination Cause Controled blowdown ofA-pad process piping to minimum pressure for pressure testing for leaks after repairs and a contingency plan in case we had to depressure LDF due to leak. Action Taken finished blow down Daily Volume (MSCF) 24062 Total Volume (MSCF) 25062 Generated 07/02/2015 3:52:31 PM Page 12 of 12 Hunt, Jennifer L (DOA) From: AK, OPS PCC EOC TL <AKOPSPCCEOCTL@bp.com> Sent: Sunday, June 14, 2015 5:50 PM To: Hunt, Jennifer L (DOA) Cc: Loepp, Victoria T (DOA); Castano, Alejandra; Benson, Gary A; Arthur, Gregory, AK, OPS GC3&PCG OSM; Borton, Kim; AK, OPS GC3 Facility OTL, AK, HSSEE Env Adv West Subject: Flaring Event at To: Jennifer Hunt, AOGCC CC: Victoria Loepp, AOGCC ienniter.hunt(c alaska.gov Victoria. loeppna.alaska.gov From: David Spall, GPB Production Optimization Team Leader A flaring event occurred at GC3 starting at 06/12/2015 00:03 and stopping at 06/12/2015 03:58 with a volume of 1000 (MSCF). The event lasted for 235 minutes and was due to a controlled blowdown of A -Pad process piping to minimum pressure for pad maintenance. The event stopped when the blowdown was finished. Thanks Dave David Spall (Alternate —Jennifer Blake) PCC/EOC Production Optimization Team Lead 907-659-4472 Office 219-689-4036 Cell david.spall@bp.com Hunt, Jennifer L (DOA) From: AK, OPS PCC EOC TL <AKOPSPCCEOCTL@bp.com> Sent: Friday, June 26, 2015 8:27 AM To: Hunt, Jennifer L (DOA) Cc: Loepp, Victoria T (DOA); Castano, Alejandra; Benson, Gary A; Arthur, Gregory; AK, OPS GC3&PCC OSM; Borton, Kim; AK, OPS GC3 Facility OTL, AK, HSSEE Env Adv West Subject: Flaring Event at GC3 To: Jennifer Hunt, AOGCC CC: Victoria Loepp, AOGCC Tenn iter, h untCa7alaska.gov Victoria. loei)pr7a.a laska.gov From: Jennifer Blake, GPB Production Optimization Team Leader A flaring event occurred at GC3 starting at 06/17/2015 14:40 and stopping at 06/17/2015 16:10 with a volume of 24062 (MSCF). The event lasted for 90 minutes. The event had a volume greater than 5000 (MSCF) and was due to a controlled blowdown of A -Pad process piping to minimum pressure for maintenance. The event stopped when the blowdown was finished. Thanks, Jennifer Blake PCC/EOC Production Optimization Team Lead (alt David Spall) Office (907) 659-4472 Cell (907) 830-6204 Jennifer.blake@bp.com STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMMISSION FACILITY REPORT OF PRODUCED GAS DISPOSITION 1. Facility Number 0290000033 2. Facility Name PBU GC 3 3. Field PBU - WOA 4. Operator BP 5. MonthNear of Disposition I July -2015 Disposition Volume MCF 20. For production from multiple pools, list contribution of each pool as a percent of Total Volume. 6. Sold 0 Pool Name Pool Code Percent 7. Reinjected 0 8. Flared or vented 1 hour or less 0 9. Flared or vented more than 1 hour (see instr.) 0 10. Pilot and Purge 19,297 11. Assist Gas 0 12. Fuel gas used in lease operations. 500,500 13. Other (see instructions) 0 Official Use Only Authorization >t hr: Safety MCF 14. TOTAL VOLUME (ITEMS 6-12) 519,797 Lease Use MCF 15. NGL Gas Equivalent Conservation MCF 16. Purchased gas Waste: MCF 17. Transferred from: 0 18. Transferred to: (Express as a negative #) CGF -25,556,495 Commissioner Date 19. Remarks: I hereby certify that the foregoing is true and correct to the best of my knowledge. /�/}�f/% Note: All volumes must be corrected Signature writ —a�q Title Manager Production Taxes and Royalties Alaska to pressure of 14.65 psia and to a % 7/ temperature of 60o F. Authority 20 Printed Name Diane ColleyPhone (907) 564-5775 Date AAC25.235. Form 10-422 Rev. 5/2009 INSTRUCTIONS ON REVERSE SIDE Submit in Duplicate STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMMISSION FACILITY REPORT OF PRODUCED GAS DISPOSITION 1. Facility Number 0290000033 2. Facility Name PBU GC 3 3. Field PBU - WOA 4. Operator BP 5. MonthNear of Disposition August-2015N u ust-2015 Disposition Volume MCF 20. For production from multiple pools, list contribution of each pool as a percent of Total Volume. 6. Sold 0 Pool Name Pool Code Percent 7. Reinjected 0 8. Flared or vented 1 hour or less 0 9. Flared or vented more than 1 hour (see instr.) 1,295 10. Pilot and Purge 18,833 11. Assist Gas 0 12. Fuel gas used in lease operations. 382,249 13. Other (see instructions) U Official use Only Authorization>l hr: Safety / 2 9s MCF 14. TOTAL VOLUME (ITEMS 6-12) 402,377 Lease Use MCF 15. NGL Gas Equivalent 0 Conservation MCF 16. Purchased gas U Waste. MCF 17. Transferred from: 0 18. Transferred to: (Express as a negative #) CGF -22,847,759 Commissioner Dale 19. Remarks: I hereby certify that t foregoing is true and correct to the best of my knowledge. Signature Title Manager Production Taxes and Royalties Alaska Printed Name Diane Colley Phone (907) 564-5775 Date Note: All volumes must be corrected to pressure of 14.65 psia and to a temperature of 60o F. Authority 20 AAC25.235. V T �-- �Z/24/! S Form 10-422 Rev. 512009 INSTRUCTIONS ON REVERSE SIDE Submit in Duplicate Events less than or equal to 1 hour TOTAL A BP EXPLORATION (ALASKA) INC. PRUDHOE BAY UNIT- GC -3 GAS FLARING INCIDENT REPORT August 2015 Not required for unplanned events <= 1 hr See Attachments ACTION TAKEN TO ELIMINATE CAUSE Not required for unplanned events <= 1 hr See Attachments TOTAL 0 Planned Events Less Than or Equal 1 Hour AND <= 5,000 mcf DATE TIME VOLUME DESCRIPTION OF INCIDENT & CAUSE ACTION TAKEN TO ELIMINATE CAUSE See Attachments See Attachments Page 10 TOTAL 0 Planned Events Exceeding 1 Hour OR > 5,000 mcf DATE TIME VOLUME DESCRIPTION OF INCIDENT & CAUSE ACTION TAKEN TO ELIMINATE CAUSE 8/17/2015 1105-1235 385 See Attachments See Attachments 8/21/2015 0010-2346 910 TOTAL 1,295 TOTAL Unplanned Events < 1 Hour 0 Unplanned Events> 1 Hour 0 Planned Events < 1 hour and not 0 exceeding 5,000 MCF Planned Events > 1 hour or 1,295 exceeding 5,000 MCF Pilot Purge 18,833 Assist 0 TOTAL FLARED VOLUME 20,128 9/11/2015 10:38 AM Flare Start Date 08/01/2015 Flare End Date 08/31/2015 GC3 Flare Report Total Volume (MSCF) 1295 Report Numbs System Date StartTime Stop Time Duration Intermittent Black Smoke Planned Reported By Volume 15-268 Controlled Blowdown 08/17/2015 11:05:00 am 12:35:00 pm 90 min No No Yes BP7\SPALLO 385 Determination Cause The event was a controlled and planned blowdown of A -Pad process piping for repair of the A-49 Line and well pad SDV. Action Taken No response taken as this was deemed to be of short duration. Daily Volume (MSCF) 385 15-275 Controlled Blowdown 08/21/2015 12:10:00 am 11:46:00 pm 1416 min Yes No Yes BPI\PRESD3 910 Determination Cause Shut GC3 down and flared off vessels to complete tar work. Action Taken Work completed for flaring Daily Volume (MSCF) 910 Total Volume (MSCF) 1295 Generated 091022015 9:47:02AM Page 10 of 10 Hunt, Jennifer L (DOA) From: AK, OPS PCC EOC TL <AKOPSPCCEOCTL@bp.com> Sent: Tuesday, August 18, 2015 10:40 AM To: Hunt, Jennifer L (DOA) Cc: Loepp, Victoria T (DOA); Castano, Alejandra; Benson, Gary A; Arthur, Gregory; AK, OPS GC3&PCC OSM; Borton, Kim; AK, HSSEE Env Adv West; AK, OPS GC3 Facility OTL; AK, OPS GC3&PCC OSM Subject: Flaring Event at To: Jennifer Hunt, AOGCC CC: Victoria Loepp, AOGCC iennifer.hunt(d)alaska.gov Victoria. loeppCa alaska.gov From: Jennifer Blake, GPB Production Optimization Team Leader A flaring event occurred at GC3 starting at 08/17/2015 11:05 and stopping at 08/17/2015 12:35 with a volume of 385 (MSCF). The event lasted for 90 minutes and was due to a controlled and planned blowdown of A -Pad process piping for repair of the A-49 Line and well pad SDV. The event stopped when the blowdown was completed. Thanks, Jennifer Blake PCC/EOC Production Optimization Team Lead (alt David Spall) Office (907) 659-4472 Cell (907) 830-6204 Jennifer.blake@bp.com Hunt, Jennifer L (DOA) From: AK, OPS PCC EOC TL <AKOPSPCCEOCTL@bp.com> Sent: Sunday, August 23, 2015 4:57 PM To: Hunt, Jennifer L (DOA) Cc: Loepp, Victoria T (DOA); Glover, Robin (SLR); Benson, Gary A; Arthur, Gregory; AK, OPS GC3&PCC OSM; Borton, Kim; AK, HSSEE Env Adv West; AK, OPS GC3 Facility OTL Subject: Flaring Event MUM To: Jennifer Hunt, AOGCC CC: Victoria Loepp, AOGCC lennifer.hunt(o)alaska.gov Victoria. loeppna alaska.00v From: Jennifer Blake, GPB Production Optimization Team Leader A flaring event occurred at GC3 starting at 08/21/2015 00:10 and stopping at 08/21/2015 23:46 with a volume of 910 (MSCF). The event lasted for 1416 minutes and was due to GC3 shutting down and flaring to complete TAR work. The event stopped when the work was completed. Thanks, Jennifer Blake PCC/EOC Production Optimization Team Lead (alt David Spall) Office (907) 659-4472 Cell (907) 830-6204 lennifer.blakePbo.com STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMMISSION FACILITY REPORT OF PRODUCED r,ns ni.qpnciTinti 1. Facility Number 2. Facility Name 0290000033 PBU GC 3 Disposition 3. Field PBU - WOA Volume MCF 4. Operator 5. Month/Year of Disposition BP I September -2015 20. For production from multiple pools, list contribution of each pool as a percent of Total Volume. 6. Sold 0 Pool Name Pool Code Percent 7. Reinjected p 8. Flared or vented 1 hour or less 535 ' 9. Flared or vented more than 1 hour (see instr.) 0 10. Pilot and Purge 18,762 ' 11. Assist Gas 0 12. Fuel gas used in lease operations. 426,211 13. Other (see instructions) 0 Offlrw Use Ordq Authorization >1 hr: Safety MCF 14. TOTAL VOLUME (ITEMS 6-12) 445,508, Lease Use MCF 15, NGL Gas Equivalent 0 Conservation MCF 16. Purchased gas 0 Waste: MCF 17. Transferred from. 0 18. Transferred to: (Express as a negative #) CGF -21,940,360 Commissioner Date 19, Remarks: I hereby certify that foregoing is truecorrect to the best of my knowledge. Signature jj1 Note: All volumes must be corrected Title Mana er Production Taxes and Ro Ides Alaska to pressure of 14.65 psia and to a D /- l temperature of 60o F. Authority 20 Printed Name Diane Colley Phone (907) 564-5775 Date / J AAC25.235. Form 10-422 Rev. 512009 INSTRUCTIONS ON REVERSE SIDE Submit in Duplicate BP EXPLORATION (ALASKA) INC. PRUDHOE BAY UNIT - GC -3 GAS FLARING INCIDENT REPORT September 2015 unplanned Events less than or equal to 1 hour DATE TIMEVOLUME 535 Not required '�•^ DESCRIPTION OF INCIDENT &CAUSE ACTION TAKEN TO ELIMINATE CAUSE 9/22/2015 0310-0332 q red for unplanned events <= 1 hr Not required for unplanned events <= 1 hr TOTAL 535 See Attachments TOTAL C See Attachments See Attachments See Attachments TOTAL 0 See Attachments TOTAL 0 See Attachments Page 9 10/1512015 10:43 AM TOTAL Unplanned Events < 1 Hour 535 Unplanned Events> 1 Hour 0 Planned Events < 1 hour and not 0 exceeding 5,000 MCF Planned Events> 1 hour or 0 exceeding 5,000 MCF Pilot Purge 18,762 Assist 0 TOTAL FLARED VOLUME 19,297 See Attachments Page 9 10/1512015 10:43 AM Flare Start Date 08/01/2015 Flare End Date 09/30/2015 GC3 Flare Report Total Volume (MSCF) 535 Report Numbe System Date Start Time Stop Time Duration Intermittent Black Smoke Planned Reported By Volume Generated 10/02/2015 2.4830PM Page 8 of 8 STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMMISSION FACILITY REPORT OF PRODUCED GAS DISPOSITION 1. Facility Number 0290000033 2. Facility Name PBU GC 3 3. Field PBU - WOA 4. Operator BP 5. MonthNear of Disposition I October -2015 Disposition Volume MCF 20. Forproduction from multiple pools, list contribution of each pool as a percent of Total Volume. 6. Sold 0 Pool Name Pool Code Percent. 7. Reinjected 0 8. Flared or vented 1 hour or less U . 9. Flared or vented more than 1 hour (see instr.) 0 , 10. Pilot and Purge 16,757 11. Assist Gas . 12. Fuel gas used in lease operations. 472,060 13. Other (see instructions) 0 Official Use Only � . Authorization >i hr: Safety MCF 14. TOTAL VOLUME (ITEMS 6-12) 488,817 Lease Use MCF 15. NGL Gas Equivalent 0 Conservation MCF 16. Purchased gas 0 Waste: MCF 17. Transferred from: 0 Commissioner Date 18. Transferred to: (Express as a negative #) CGF -21,319,260 19. Remarks: I hereby certify that the foregoing is true and correct to the best of my knowledge. Note: All volumes must be corrected Signature Title Manager Production Taxes and Ro aloes Alaska to pressure of 14.65 psis and to a temperature of 60o F. Authority 20 Printed Name Diane ColleyPhone (907) 564-5775 Date AAC25.235. Form 10422 Rev. 5/2009 INSTRUCTIONS ON REVERSE SIDE Submit in Duplicate BP EXPLORATION (ALASKA) INC. PRUDHOE BAY UNIT - GC -3 GAS FLARING INCIDENT REPORT October 2015 Not required for unplanned events <= 1 hr Not required for unplanned events <= 1 hr TOTAL 0 Unplanned Events greater than 1 hour DATE TIME VOLUME DESCRIPTION OF INCIDENT & CAUSE ACTION TAKEN TO ELIMINATE CAUSE See Attachments See Attachments TOTAL 0 DATE TIME VOLUME DESCRIPTION OF INCIDENT & CAUSE ACTION TAKEN TO ELIMINATE CAUSE See Attachments See Attachments TOTAL 0 Planned Events Exceeding 1 Hour OR > 5,000 mcf DATE TIME VOLUME DESCRIPTION OF INCIDENT & CAUSE ACTION TAKEN TO ELIMINATE CAUSE TOTAL Unplanned Events < 1 Hour Unplanned Events> 1 Hour Planned Events < 1 hour and not exceeding 5,000 MCF Planned Events > 1 hour or exceeding 5,000 MCF Pilot Purge Assist TOTAL FLARED VOLUME 0 TOTAL 0 0 0 0 16,757 0 16,757 See Attachments See Attachments Page 11 11/16/2015 3:35 PM STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMMISSION FACILITY REPORT OF PROM iCFn rec nicunerrInAi 1. Facility Number 2. Facility Name 0290000033 PBU GC 3 Disposition 3. Field PBU - WOA Volume MCF 4. Operator 5. MonthNear of Disposition BP November -2015 20. For production from multiple pools, list contribution or each pool as a percent of Total Volume. 6. Sold 0 Pool Name Pool Code Percent 7. Reinjected 0 8. Flared or vented 1 hour or less 0 9. Flared or vented more than 1 hour (see instr) 761 10. Pilot and Purge 14,063 11. Assist Gas 0 12. Fuel gas used in lease operations. 501,689 13. Other (see instructions) 0Official Use Only Authorization >1 hr: Safety MCF 14. TOTAL VOLUME (ITEMS 6-12) 516,513 Lease Use MCF 15. NGL Gas Equivalent 0 Conservation MCF 16. Purchased gas Waste: MCF 17. Transferred from. 0 / Commissioner Date 18. Transferred to: (Express as a negative #) CGF -23,253,154 19. Remarks: I hereby certify mat is foregoing is true and correct to the best of my knowledge. Signature j a� 6w Note: All volumes must be corrected Title Manager Production Taxes and Rgyalties Alaska to pressure of 14.65 psia and to a temperature of 60o F. Authority 20 Printed Name Diane Colley Phone (907) 564-5775 Date AAC25.235. VTt-- /s//G Form 10-422 Rev. 5/2009 INSTRUCTIONS ON REVERSE SIDE Submit in Duplicate Events less than or equal to TOTAL 7419 I BP EXPLORATION (ALASKA) INC. PRUDHOE BAY UNIT - GC -3 GAS FLARING INCIDENT REPORT November 2015 Not required for unplanned events <= 1 hr Not required for unplanned events <= 1 hr See Attachments See Attachments TOTAL 0 Planned Events Less Than or Equal 1 Hour AND <= 5.000 mcf TOTAL See Attachments 0 See Attachments Page 8 iPlanned Events Exceeding 1 Hour OR > 5,000 mcf DATE TIME VOLUME DESCRIPTION OF INCIDENT & CAUSE ACTION TAKEN TO ELIMINATE CAUSE 11/27/2015 0001-1625 761 See Attachments See Attachments TOTAL 761 TOTAL Unplanned Events < 1 Hour 0 Unplanned Events> 1 Hour 0 Planned Events < 1 hour and not 0 exceeding 5,000 MCF Planned Events > 1 hour or 761 exceeding 5,000 MCF Pilot Purge 14,063 Assist 0 TOTAL FLARED VOLUME 14,824 12/15/2015 9:52 AM Flare Start Date 11/01/2015 Flare End Date 11130/2015 GC3 Flare Report Total Volume (MSCF) 761 Report Numbe System Date Start Time Stop Time Duration Intermittent Black Smoke Planned Reported By Volume 15-393 Controlled Blowdown 11/27/2015 12:01:00 am 4.25:00 pm 984 min No No Yes BP1\MOORDV 761 Determination Cause Depressured "A" pad flow lines for work performed on flow lines, and test separator valves. Action Taken Equipment was restarted at 1625 hours. Daily Volume (MSCF) 761 Total Volume (MSCF) 761 Generated 12/03/2015 4.18:41 PM Page 7 of 7 11/30/2015 Flaring Event at GC3 Flaring Event at GC3 AK, OPS PCC EOC TL [AKOPSPCCEOCTL@bp.com] Sent:Monday, November 30, 2015 8:23 AM To: AOGCC Reporting (DOA sponsored) Cc: Loepp, Victoria T (DOA); Benson, Gary A [Gary.Benson@bp.com]; Arthur, Gregory [Gregory.Arthur@bp.com]; AK, OPS GC3&PCC OSM [AKOPSGC3PCCOSM@BP.com]; Borton, Kim [Kim.Borton@bp.com]; AK, HSSEE Env Adv West [AKHSSEEEnvAdvWest@bp.com]; Glover, Robin (SLR) [Robin.Glover@bp.com]; AK, OPS GO Facility OTL [AKOPSGC3Faci IityOTL@bp.com] To: AOGCC Reporting CC: Victoria Loepp, AOGCC Aoacc.reoortina@alaska.aov Victoria.loepofaDalaska.aov From: David Spall, GPB Production Optimization Team Leader A flaring event occurred at GC3 starting at 11/27/2015 00:01 and stopping at 11/27/2015 16:25 with a volume of 761 (MSCF). The event lasted for 984 minutes and was due to De -pressured "A" pad flow lines for work performed on flow lines, and test separator valves. The event stopped when "A" Pad flow tines were de -pressured and work was completed. Thanks David Spall (Alternate—Jennifer Blake) PCC/EOC Production Optimization Team Lead 907-659-4472 Office 219-689-4036 Cell david.spall@bp.com https://webmai la.alaska.gov/owat?ae=ltem &t= IPM .Note&id=RgAAAABKLne2zgP4SoM kepOhCxbSBw BUvQ964rjQTgYgn3632GdIAAAAhhLyAABUvQ964rjQT... 1/1 STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMMISSION FACILITY REPORT OF PRODUCED GAS DISPOSITION 1. Facility Number 0290000033 2. Facility Name PBU GC 3 3. Field PBU - WOA 4. Operator BP 5. MonthNear of Disposition December -2015 Disposition Volume MCF 20. For production from multiple pools, list contribution of each pool as a percent of Total Volume. 6. Sold 0 Pool Name Pool Code Percent 7. Reinjected 0 8. Flared or vented 1 hour or less 0 9. Flared or vented more than 1 hour (see instr.) 0 10. Pilot and Purge 17,184 11. Assist Gas 0 12. Fuel gas used in lease operations. 531,711 13. Other (see instructions) Q Official Use Only Authorization >1 hr: Safety MCF 14. TOTAL VOLUME (ITEMS 6-12) 548,895 Lease Use MCF 15. NGL Gas Equivalent 0 Conservation MCF 16. Purchased gas 0 Waste: MCF 17. Transferred from: 0 18. Transferred to: (Express as a negative #) CGF -23,146,521 Commissioner Date 19. Remarks: I hereby certify that the foregoing is true and correct to the best of my knowledge. //,t/�,� Signature ��(�t�"h I�' i�t'c'�C1 Title Manager Production Taxes and R allies Alaska Note: All volumes must be corrected to pressure of 14.65 psia and to a temperature of 60o F. Authority 20 AAC25.235. Printed Name Diane Colley Phone (907) 564-5775 Dale / W Form 10-422 Rev. 5/2009 INSTRUCTIONS ON REVERSE SIDE Submit in Duplicate Events less than or equal to 1 hour TOTAL BP EXPLORATION (ALASKA) INC. PRUDHOE BAY UNIT - GC -3 GAS FLARING INCIDENT REPORT December 2015 Not required for unplanned events <= 1 hr 0 DESCRIPTION OF [Ni See Attachments ACTION TAKEN TO ELIMINATE CAUSE Not required for unplanned events <= 1 hr See Attachments TOTAL 0 Planned Events Less Than or Equal 1 Hour AND <= 5,000 mcf DATE TIME VOLUME DESCRIPTION OF INCIDENT & CAUSE ACTION TAKEN TO ELIMINATE CAUSE See Attachments See Attachments TOTAL 0 Planned Events Exceeding 1 Hour OR > 5.000 mcf DATE TOTAL Unplanned Events < 1 Hour Unplanned Events> 1 Hour Planned Events < 1 hour and not exceeding 5,000 MCF Planned Events > 1 hour or exceeding 5,000 MCF Pilot Purge Assist TOTAL FLARED VOLUME See Attachments 0 TOTAL 0 0 0 0 17,184 0 17,184 ACTION TAKEN TO E See Attachments Page 9 1/14/2016 4:19 PM