Alaska Logo
Department of Commerce, Community, and Economic Development
Alaska Oil and Gas Conservation
Commission
Loading...
HomeMy WebLinkAboutPBU Lisburne Prod (GPMA) - BP Exploration (Alaska) Inc.State of Alaska AOGCC Gas Disposition Files Year: 2015 Facility: PBU Lisburne Prod (GPMA) Operator: BP EXPLORATION (ALASKA) INC.     STATE OF ALASKA RECEwE,D FEB 19 2015 ALASKA OIL AND GAS CONSERVATION COMMISSION AOGGC FACILITY REPORT OF PRODUCED GAS DISPOSITION V 1. Facility Number 0290000009 2. Facility Name PBU LISBURNE PROD GPMA 3. Field PBU - GPMA 4. Operator 5. Moni77ear of Disposition BP I January -2015 Disposition Volume MCF 20. For production from multiple pools, list contribution of each pool as a percent of Total Volume. 6. Sold 108,066 Pool Name Pool Code Percent 7. Reinjected 11,615,342 Lisburne 640144 23.7% Niakuk 640148 0.2% 8. Flared or vented 1 hour or less 0 North Prudhoe Bay State 640152 0.0% Sadlerochit 640150 7.5% 9. Flared or vented more than 1 hour (see instr.) 0 Point McIntyre 640180 68.0% Ivis hak-Sa River test in GPMA 640147 0.6% 10. Pilot and Purge 11,144 West Beach 640186 0.0% 11. Assist Gas 167,361 12. Fuel gas used in lease operations. 843,273 13. Other (see instructions) 208,587 Official Use Only authorization >7 hr. Safety MCF 14. TOTAL VOLUME (ITEMS 6.12) 12,953,773 Lease Use MCF 15. NGL Gas Equivalent 108,066 Conservation MCF 16. Purchased gas 0 Waste: MCF 17. Transferred from: 978,926 Commissioner Date 18. Transferred to: (Express as a negative #) () 19. Remarks: Block 13: Lift Gas Off Field; Block 17: MI from Prudhoe = 978,908 and Fuel Gas from Prudhoe = 18 hereby certify that th foregoing is true and correct to the best of my knowledge. Note: All volumes must be corrected Signature Title Manager Production Taxes and Royalties Alaska to pressure of 14.65 psis and t0 a U „ temperature of 60o F. Authority 20 Printed Name Diane Colley Phone (907) 564-5775 Date AAC25.235. Form 10422 Rev. 5/2009 INSTRUCTIONS ON REVERSE SIDE Submit in Duplicate STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMMISSION FACILITY REPORT OF PRODUCED GAS DISPOSITION 1. Facility Number 0290000009 2. Facility Name P13 LISBURNE PROD GPMA 3, Field PBU - GPMA 4. Operator BP 5. Month/Year of Disposition I February -2015 Disposition Volume MCF 20. Forproduction from multiple pools, list contribution of each pool as a percent of Total Volume. 6. Sold 93,912 Pool Name Pool Code Percent 7, Reinjected 9,516,689 Lisburne 640144 25.0% Niakuk 640148 0.2% 8. Flared or vented 1 hour or less 0 North Prudhoe Bay State 640152 0.0% Sadlerochit 640150 5.0% 9. Flared or vented more than 1 hour (see instr.) 0 Point McIntyre 640180 69.3% lvishak-SagRiver test in GPMA 640147 0.5% 10. Pilot and Purge 10,065 West Beach 640186 0.0% 11. Assist Gas 152,707 12. Fuel gas used in lease operations. 756,174 13. Other (see instructions) 142,005 Official Use Only Authorization>1 hr: Safety MCF 14. TOTAL VOLUME (ITEMS 6-12) 10,671,552 Lease Use MCF 15. NGL Gas Equivalent 93,912 Conservation MCF 16. Purchased gas 0 Waste: MCF 17. Transferred from: 624,226 Commissioner Date 18. Transferred to: (Express as a negative #) O 19. Remarks: Block 13: Lift Gas Off Field; Block 17: M[ from Prudhoe = 624,226 and Fuel Gas from Prudhoe = 0 1 hereby certify that the foregoing is true and correct to the best of my knowledge. 0��9& Note: All volumes must be corrected Signature .�,J�SK Title Mana er Production Taxes and Ro alties Alaska to pressure of 14.65 psia and to a temperature of 60o F. Authority 20 Printed Name Diane Colley Phone (907) 564-5775 Date,_,'WX— AAC25.235. Form 10-422 Rev. 512009 INSTRUCTIONS ON REVERSE SIDE Submit in Duplicate STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMMISSION FACILITY REPORT OF PRODUCED GAS DISPOSITION 1. Facility Number 0290000009 2. Facility Name PBU LISBURNE PROD GPMA 3. Field PBU - GPMA 4. Operator 5. MonthNear of Disposition BP I March -2015 Disposition Volume MCF 20. For production fmm multiple pools, list contribution of each pool as a percent of Total Volume. 6. Sold 96,069 Pool Name Pool Code Percent 7. Reinjected 10,052,083 Lisburne 640144 25.5% Niakuk 640148 0.3% 8. Flared or vented 1 hour or less 246 North Prudhoe Ba State 640152 0.0% Sadlerochit 640150 5.8% 9. Flared or vented more than 1 hour (see instr.) 0 Point McIntyre 640180 68.0% Ivishak-SagRiver test in GPMA 640147 0.5% 10. Pilot and Purge 11,138 West Beach 640186 0.0% 11. Assist Gas 166,461 12. Fuel gas used in lease operations. 810,372 13. Other (see instructions) 325,718 Official Use Only Authorization >1 he Safety MCF 14. TOTAL VOLUME (ITEMS 6-12) 11,464,087 Lease Use MCF 15. NGL Gas Equivalent 98,069 Conservation MCF 16. Purchased gas Waste: MCF 17. Transferred from: 762,494 Commissioner Date 18. Transferred to: (Express as a negative #) 0 19 Remarks: Block 13: Lift Gas Off Field; Block 17: MI from Prudhoe = 762,494 and Fuel Gas from Prudhoe = 0 1 hereby certify that the foregoing is true and correct to the best of my knowledge. �,f �' r,� Note: All volumes must be corrected Signature �ii./',.L, _ ,AAS l Title Manager Production Taxes and Ro alties Alaska to pressure of 14.65 psia and to a (V i,- temperature of 60o F. Authority 20 Printed Name Diane Colley Phone (907) 564-5775 Date ItL, ite) r AAC25.235. Form 10-422 Rev. 5/2009 INSTRUCTIONS ON REVERSE SIDE Submit in Duplicate STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMMISSION FACILITY REPORT OF PRODUCED GAS DISPOSITION RECEIVED MAY 14 2015 AOGCC 1. Facility Number 0290000009 2. Facility Name PBU LISBURNE PROD GPMA 3. Field PBU - GPMA 4. Operator BP 5. MonthNe%0.0% Disposition Volume MCF 20. Forproduction from multiple pools, list contribution of each potalVolume. 6. Sold 95,973 Pool Name PoolCodent7. Reinjected 10,033,903 Lisburne 6401443%Niakuk 6401484%8. Flared or vented 1 hour or less 0North Prudhoe Ba State 6401520% Sadlerochit 640150 7.5% 9. Flared or vented more than 1 hour (see instr.) 0 Point McIntyre 640180 57.2% Ivishak-SagRiver test in GPMA 640147 0.5% 10. Pilot and Purge 10,7 West Beach 640186 0.0% 11. Assist Gas 165,377 12. Fuel gas used in lease operations. 821,599 13. Other (see instructions) 305,987 Official Use Only Authorization >1 hr: Safety MCF 14. TOTAL VOLUME (ITEMS 6-12) 11,433,571 Lease Use MCF 15, NGL Gas Equivalent 95,973 Conservation MCF 16. Purchased gas 0 Waste: MCF 17. Transferred from: 1,273788 Commissioner Date 18. Transferred to: (Express as a negative #) 19. Remarks: Block 13: Lift Gas Off Field; Block 17: MI from Prudhoe = 1,271,779 and Fuel Gas from Prudhoe = 2,009 1 hereby certify that t foregoing is true and correct to the best of my knowledge. Note: All volumes must be corrected Signature W/ Title Mana er Production Taxes and Ro aloes Alaska I to pressure of 14.65 psis and to a 3 temperature of 60o F. Authority 20 Printed Name Diane ColleyPhone (907) 564-5775 Date AAC25.235. Form 10-422 Rev. 5/2009 INSTRUCTIONS ON REVERSE SIDE Submit in Duplicate RECEIVED JUN 15 2015 STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMMISSION AIOGCC FACILITY REPORT OF PRODUCED GAS DISPOSITION 1. Facility Number 0290000009 2. Facility Name PBU LISBURNE PROD (GPMA 3. Field PBU - GPMA 4. Operator BP 5. Month/Year of Disposition May -2015I Disposition Volume MCF 20. Forproduction from multiple pools, list contribution of each pool as a percent of Total Volume, 6. Sold 86,114 Pool Name Pool Code Percent 7. Reinjected 9,244,235 Lisburne 640144 29.7% Niakuk 640148 1.2% 8. Flared or vented 1 hour or less 0 North Prudhoe Bay State 640152 0.0% Sadlerochit 640150 8.1% 9. Flared or vented more than 1 hour (see instr.) 0 Point McIntyre 640180 60.3% Ivishak-SagRiver test in GPMA 640147 0.7% 10. Pilot and Purge 10,923 West Beach 640186 0.0% 11, Assist Gas 169,937 12. Fuel gas used in lease operations. 784,526 13. Other (see instructions) 200,262 Official Use Only Authorization>1 hr: Safety MCF 14. TOTAL VOLUME (ITEMS 6-12) 10,495,997 Lease Use MCF 15. NGL Gas Equivalent 86,114 Conservation MCF 16. Purchased gas 0 Waste: MCF 17. Transferred from: 1,671,442 18. Transferred to: (Express as a negative #) 0 Commissioner Date 19. Remarks: Block 13: Lift Gas Off Field; Block 17: MI from Prudhoe = 1,667,106 and Fuel Gas from Prudhoe = 4,336 1 hereby certify that the foregoing is true and correct to the best of my knowledge. �/yy�r Note: All volumes must be corrected Signature ey � Title Mar er Production Taxes and Royalties Alaska to pressure of 14.65 psis and to a temperature of 60o F. Authority 20 Printed Name Diane Colley Phone (907) 564-5775 Date / AAC25.235. Form 10-422 Rev. 5/2009 INSTRUCTIONS ON REVERSE SIDE Submit in Duplicate STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMMISSION FACILITY REPORT OF PRODUCED GAS DISPOSITION 1. Facility Number 0290000009 2. Facility Name PB LISBURNE PROD GPMA 3. Field PBU - GPMA 4. Operator BP 5. MonthNear of Disposition I June -2015 Disposition Volume MCF 20. Forproduction from multiple pools, list contribution of each pool as a percent of Total Volume. 6. Sold 58,419 Pool Name Pool Code Percent 7. Reinjected 8,015,651 Lisburne 640144 30.2% Niakuk 640148 1.0% 8 Flared or vented 1 hour or less 25 North Prudhoe Bay State 640152 0.0% Sadlerochit 640150 8.9% 9. Flared or vented more than 1 hour (see instr.) 5,381 Point McIntyre 640180 59.6% Ivishak-SagRiver test in GPMA 640147 0.3% 10. Pilotand Purge 10,704 West Beach 640186 1 0.0% 11. Assist Gas 184,094 12. Fuel gas used in lease operations. 716,194 13. Other (see instructions) uctions) 171,271 Use Only Authorization 11 hr Safety S3� MCF 14. TOTAL VOLUME (ITEMS 6.12) 9,161,739 Lease Use MCF 15. NGL Gas Equivalent 58,419 Conservation MCF 16. Purchased gas 0 Waste: MCF 17. Transferred from: 1,647,285 Commissioner Date 18. Transferred to: (Express as a negative #) 0 19. Remarks: Block 13: Lift Gas Off Field; Block 17: MI from Prudhoe = 1,646,327 and Fuel Gas from Prudhoe = 958 1 hereby certify that foregoing is true and correct to the best of my knowledge. I U///yfn �I�f� Note: All volumes must be corrected Signature CCCJJJIIIW/ Gi ls� Title Manager Production Taxes and Royalties Alaska to pressure of 14.65 psia and to a temperature of 60o F. Authority 20 Printed Name Diane ColleyPhone (907) 564-5775 Date 6 AAC25.235. rTL- et / z/I i Form 10-422 Rev. 512009 INSTRUCTIONS ON REVERSE SIDE Submit in Duplicate BP EXPLORATION ALASKA, INC, CONSERVATION ORDER NO. 219 PRUDHOE BAY, LISBURNE LISBURNE PRODUCTION CENTER GAS FLARING INCIDENTS Jun -15 VOLUME PLANNED DATE TIME (MSCF) DESCRIPTION OF INCIDENTS & CAUSE UNPLANNED ACTION TAKEN TO ELIMINATE CAUSE 6/15/2015 7 Not required for unplanned events <= 1 hour U Not required for unplanned events <= 1 hour Total Flare <= 2 Hour 7 1,142 Depressured 24 common -line due to leak at drill site Ll via 6/6/2015 1600-2359 PSV bypass at LPC. U 1,697 Depressured 24 common -line due to leak at drill site Ll via 6/7/2015 0000-0530 PSV bypass at LPC. U Total Flare> 1 Hour 2,839 Volume Flared Measured Safety Pilot 3,788 Continuous Assist 70,224 TOTAL FLARED 76,858 BP EXPLORATION ALASKA, INC, CONSERVATION ORDER NO. 219 PRUDHOE BAY, POINT MCINTYRE LISBURNE PRODUCTION CENTER GAS FLARING INCIDENTS Jun -15 VOLUME PLANNED DATE TIME (MSCF) DESCRIPTION OF INCIDENTS & CAUSE UNPLANNED ACTION TAKEN TO ELIMINATE CAUSE 6/15/2015 16 Not required for unplanned events <= 1 hour U Not required for unplanned events <= 1 hour Total Flare <=1 Hour 16 1,739 6/6/2015 1600-2359 6/7/2015 0000-0530 Total Flare > 1 Hour 1,739 Volume Flared 1,755 Measured Safety Pilot 5,690 Continuous Assist 91,745 TOTAL FLARED 99,190 Depressured 24 common -line due to leak at drill site Ll via PSV bypass at LPC. U Depressured 24 common -line due to leak at drill site Ll via PSV bypass at LPC. U BP EXPLORATION ALASKA, INC, CONSERVATION ORDER NO. 219 PRUDHOE BAY, COMBINED NIAKUK LISBURNE PRODUCTION CENTER GAS FLARING INCIDENTS Jun -15 VOLUME PLANNED DATE TIME (Mscf) DESCRIPTION OF INCIDENTS & CAUSE UNPLANNED ACTION TAKEN TO ELIMINATE CAUSE 6/15/2015 0 Not required for unplanned events <= 1 hour U Not required for unplanned events <= 1 hour Total Flare <= 1 Hour 0 30 Depressured 24 common -line due to leak at drill site Ll via 6/6/2015 1600-2359 P5V bypass at LPC. U 55 Depressured 24 common -line due to leak at drill site Ll via 6/7/2015 0000-0530 PSV bypass at LPC. U Total Flare > 1 Hour 85 Volume Flared 85 Measured Safety Pilot 121 Continuous Assist 2,223 TOTAL FLARED 2,429 BP EXPLORATION ALASKA, INC, CONSERVATION ORDER N0. 219 PRUDHOE BAY, RAVEN LISBURNE PRODUCTION CENTER GAS FLARING INCIDENTS Jun -15 VOLUME PLANNED DATE TIME (Mscf) DESCRIPTION OF INCIDENTS & CAUSE UNPLANNED ACTION TAKEN TO ELIMINATE CAUSE 6/15/2015 0 Not required for unplanned events <= 1 hour Total Flare <=1 Hour 0 12 Depressured 24 common -line due to leak at drill site Ll via 6/6/2015 1600-2359 PSV bypass at LPC. 19 Depressured 24 common -line due to leak at drill site L1 via 6/7/2015 0000-0530 PSV bypass at LPC. Total Flare > 1 Hour 31 Volume Flared 31 Measured Safety Pilot 38 Continuous Assist 706 TOTALFLARED 775 U Not required for unplanned events <= 1 hour U U BP EXPLORATION ALASKA, INC, CONSERVATION ORDER NO. 219 PRUDHOE BAY, PRUDHOE LISBURNE PRODUCTION CENTER GAS FLARING INCIDENTS Jun -15 VOLUME 1,067 PLANNED 19,196 DATE TIME (Mscf) DESCRIPTION OF INCIDENTS & CAUSE UNPLANNED ACTION TAKEN TO ELIMINATE CAUSE 6/15/2015 2 Not required for unplanned events <= 1 hour U Not required for unplanned events <= 1 hour Total Flare <= 1 Hour 2 266 6/6/2015 1600-2359 421 6/7/2015 0000-0530 Total Flare> 1 Hour 687 Volume Flared 689 Measured Safety Pilot 1,067 Continuous Assist 19,196 TOTAL FLARED 20,952 Depressured 24 common -line due to leak at drill site Ll via PSV bypass at LPC. U Depressured 24 common -line due to leak at drill site Ll via PSV bypass at LPC. U BP EXPLORATION ALASKA, INC, CONSERVATION ORDER NO. 219 PRUDHOE BAY, NORTH PRUDHOE BAY LISBURNE PRODUCTION CENTER GAS FLARING INCIDENTS Jun -15 Total Flare <=1 Hour 0 0 06/06/15 1600-2359 A 06/07/15 0000-0530 Total Flare > 1 Hour 0 Volume Flared 0 Measured Safety Pilot 0 Continuous Assist 0 TOTALFLARED 0 Depressured 24 common line due to leak at drill site Ll via PSV bypass at LPC. U Depressured 24 common -line due to leak at drill site Ll via PSV bypass at LPC. U VOLUME PLANNED DATE TIME (MSCF( DESCRIPTION OF INCIDENTS & CAUSE UNPLANNED ACTION TAKEN TO ELIMINATE CAUSE 06/15/15 0 Not required for unplanned events <= 1 hour U Not required for unplanned events <= 1 hour Total Flare <=1 Hour 0 0 06/06/15 1600-2359 A 06/07/15 0000-0530 Total Flare > 1 Hour 0 Volume Flared 0 Measured Safety Pilot 0 Continuous Assist 0 TOTALFLARED 0 Depressured 24 common line due to leak at drill site Ll via PSV bypass at LPC. U Depressured 24 common -line due to leak at drill site Ll via PSV bypass at LPC. U BP EXPLORATION ALASKA, INC, CONSERVATION ORDER NO. 219 PRUDHOE BAY, WEST BEACH LISBURNE PRODUCTION CENTER GAS FLARING INCIDENTS Jun -15 Total Flare <=1 Hour 0 0 Depressured 24 common -line due to leak at drill site Ll via 06/06/15 1600-2359 PSV bypass at LPC. U 0 Depressured 24 common -line due to leak at drill site Ll via 06/07/15 0000-0530 PSV bypass at LPC. U Total Flare > 1 Hour 0 Volume Flared 0 Measured Safety Pilot VOLUME Continuous Assist PLANNED DATE TIME (MSCF) DESCRIPTION OF INCIDENTS & CAUSE UNPLANNED ACTION TAKEN TO ELIMINATE CAUSE 06/15/15 0 Not required for unplanned events <= 1 hour U Not required for unplanned events <= 1 hour Total Flare <=1 Hour 0 0 Depressured 24 common -line due to leak at drill site Ll via 06/06/15 1600-2359 PSV bypass at LPC. U 0 Depressured 24 common -line due to leak at drill site Ll via 06/07/15 0000-0530 PSV bypass at LPC. U Total Flare > 1 Hour 0 Volume Flared 0 Measured Safety Pilot 0 Continuous Assist 0 TOTAL FLARED 0 Hunt, Jennifer L (DOA) From: AK, OPS PCC EOC TL <AKOPSPCCEOCTL@bp.com> Sent: Monday, June 08, 2015 6:21 AM To: Loepp, Victoria T (DOA); Regg, James B (DOA) Cc: AK, OPS GPMA Facility OTL; AK, OPS GPMA OSM; Loader, Neil; Leonard, Sean A; Benson, Gary A; Arthur, Gregory; AK, HSSEE Env Adv East; AK, HSSEE Env TL (North Slope); Hunt, Jennifer L (DOA); AK, OPS GC3&PCC OSM; Borton, Kim; Castano, Alejandra Subject: GPMA LPC Ll Commonline Uncontrolled Release 5 Day Report Attachments: _LPC Ll Gas Release 6-6-15 5 Day Report.pdf Victoria Ferguson & Jim Regg, This is a follow-up to the courtesy verbal notification made 6/07/13 to the Deadhorse AOGCC and email sent to Mr. Regg. Please find enclosed the 5 -day report for the release which occurred at GPMA LPC L1 Pad, on the L1/PtMac commonline on 6/6/2015. This was also faxed to 907-276-7542. Please give me a call if you have further questions. A 30 -day report will be provided after completion of the incident investigation. Regards, Dave David Spall (Alternate —Jennifer Blake) PCC/EOC Production Optimization Team Lead 907-659-4472 Office 219-689-4036 Cell david.spall@bo.com Hunt, Jennifer L (DOA) From: AK, OPS PCC EOC TL <AKOPSPCCEOCTL@bp.com> Sent: Monday, June 08, 2015 5:28 PM To: Hunt, Jennifer L (DOA) Cc: Loepp, Victoria T (DOA); Castano, Alejandra; Benson, Gary A; Arthur, Gregory; AK, HSSEE Env Adv West; AK, OPS GC3&PCC OSM; Borton, Kim; AK, OPS GPMA Facility OTL; AK, OPS GPMA OSM Subject: Flaring Event a To: Jennifer Hunt, AOGCC CC: Victoria Ferguson, AOGCC iennifer.huntnc alaska.00v victoria.ferouson o)alaska.gov From: David Spall, GPB Production Optimization Team Leader A flaring event occurred at LPC starting at 06/06/2015 16:00 and stopping at 06/06/2015 23:59 with a volume of 3189 (MSCF). The event lasted for 479 minutes and was due to De -pressuring 24 common -line due to leak at Drill Site L1. The event stopped once the de -pressuring was completed and closed bypass once common -line reached 0 PSI A flaring event occurred at LPC starting at 06/07/2015 00:00 and stopping at 06/07/2015 05:30 with a volume of 2192 (MSCF). The event lasted for 330 minutes and was due to De -pressuring 24 common -line due to leak at Drill Site L1. The event stopped once the de -pressuring was completed and closed bypass once common -line reached 0 PSI. Thanks, Dave David Spall (Alternate — Jennifer Blake) 2 g lI PCC/EOC Production Optimization Team Lead 907-659-4472 Office 219-689-4036 Cell david.spall@bp.com STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMMISSION FACILITY REPORT OF PRODUCED GAS DISPOSITION 1. Facility Number 0290000009 2. Facility Name PB LISBURNE PROD GPMA 3. Field PBU - GPMA 4, Operator BP 5. MonthNear of Disposition July -2015 Disposition Volume MCF 20. Forproduction from multiple pools, list contribution of each pool as a percent of Total Volume. 6. Sold 29,409 Pool Name Pool Code Percent 7. Reinjected 7,301,253 Lisburne 640144 9.6% Niakuk 640148 0.2% 8. Flared or vented 1 hour or less 278 North Prudhoe Bay State 640152 0.0% Sadlerochit 640150 10.3% 9. Flared or vented more than 1 hour (see instr.) 0 Point McIntyre 640180 79.9% Ivishak-Saq River test in GPMA 640147 0.1% 10. Pilot and Purge 11,531 West Beach 640186 0.0% 11, Assist Gas 168,956 12. Fuel gas used in lease operations. 529,693 13. Other (see instructions) 157,674 Official Use Only Authorization >1 h[ Safety MCF 14. TOTAL VOLUME (ITEMS 6-12) 8,196,794 Lease Use MCF 15, NGL Gas Equivalent 29.409 Conservation MCF 16. Purchased gas 0 Waste: MCF 17. Transferred from: 1,133,914 Commissioner Date 18. Transferred to: (Express as a negative p) 0 19. Remarks: Block 13: Lift Gas Off Field; Block 17: MI from Prudhoe = 1,133,883 and Fuel Gas from Prudhoe = 31 1 hereby certify that!,foregoing is true and correct to the best of my knowledge. �/y�,t �/����/,�� d Note: All volumes must be corrected Signature GG t 1 Cy�'1J('�L�%I Title Mana er Production Taxes a d R alties Alaska to pressure of 14.65 psia and to a % temperature of 60o F. Authority 20 Printed Name Diane ColleyPhone (907) 564-5775 Date / r / AAC25.235. Form 10-422 Rev. 512009 INSTRUCTIONS ON REVERSE SIDE Submit in Duplicate STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMMISSION FACILITY REPORT OF PRODUCED GAS DISPOSITION 1. Facility Number 0290000009 2. Facility Name PBU LISBURNE PROD GPMA 3. Field PBU - GPMA 4. Operator 5. MonthNear of Disposition BP August -2015 Disposition Volume MCF 20. Forproduction from multiple pools, list contribution of each pool as a percent of Total Volume, 6. Sold U Pool Name Pool Code Percent 7. Reinjected 7,099,999 Lisburne 640144 26.5% Niakuk 640148 0.3% 8. Flared or vented 1 hour or less 391 North Prudhoe Bay State 640152 0.0% Sadlerochit 640150 7.6% 9. Flared or vented more than 1 hour (see insV.) 0 Point McIntyre 640180 65.6% Ivishak-SagRiver test in GPMA 640147 0.1% 10. Pilot and Purge 11,698 West Beach 640186 0.0% 11, Assist Gas 165,654 12. Fuel gas used in lease operations. 540,512 13. Other (see instructions) 132,902 Official Use Only Authorization>1 he Safety MCF 14. TOTAL VOLUME (ITEMS 6.12) 7,951,156 Lease Use MCF 15. NGL Gas Equivalent 0 Conservation MCF 16. Purchased gas 0 Waste: MCF 17. Transferred from: 950,069 Commissioner Date 18. Transferred to: (Express as a negative #) 0 19. Remarks: Block 13: Lift Gas Off Field; Block 17: MI from Prudhoe = 950,056 and Fuel Gas from Prudhoe = 13 1 hereby certify that the foregoing is true and correct to the best of my knowledge. / y1/f 4 Note: All volumes must be corrected Signature 7 4, l.(.-��"//�V� Title Mana er Production Taxes and Ro alties Alaska to pressure of 14.65 psis and to a temperature of 60o F. Authority 20 Printed Name Diane Colley Phone (907) 564-5775 Date kk AAC25.235. Form 10-422 Rev. 5/2009 INSTRUCTIONS ON REVERSE SIDE Submit in Duplicate BP EXPLORATION ALASKA, INC, CONSERVATION ORDER NO. 219 PRUDHOE BAY, LISBURNE LISBURNE PRODUCTION CENTER GAS FLARING INCIDENTS Aug -15 VOLUME PLANNED DATE TIME (MSCF) DESCRIPTION OF INCIDENTS & CAUSE UNPLANNED ACTION TAKEN TO ELIMINATE CAUSE 8/4/2015 0823-0824 1 8/7/2015 1455-1505 9 8/21/2015 0148-0152 141 Total Flare <= 1 Hour 151 Total Flare > 1 Hour Volume Flared 151 Measured Safety Pilot 3,144 Continuous Assist 44,162 TOTAL FLARED 47,457 Not required for unplanned events <= 1 hour Not required for unplanned events <= 1 hour Not required for unplanned events <= 1 hour Planned Not required for unplanned events <= 1 hour Planned Not required for unplanned events <= 1 hour Planned Not required for unplanned events <= 1 hour BP EXPLORATION ALASKA, INC, CONSERVATION ORDER NO. 219 PRUDHOE BAY, POINT MCINTYRE LISBURNE PRODUCTION CENTER GAS FLARING INCIDENTS Aug•15 VOLUME PLANNED DATE TIME (MSCF) DESCRIPTION OF INCIDENTS & CAUSE UNPLANNED ACTION TAKEN TO ELIMINATE CAUSE 8/4/2015 0823-0824 6 8/7/2015 1455-1505 86 8/21/2015 0148-0152 106 Total Flare <= 1 Hour 198 Total Flare > 1 Hour 0 Volume Flared 198 Measured Safety Pilot 7,542 Continuous Assist 107,158 TOTAL FLARED 114,898 Not required for unplanned events <= 1 hour Planned Not required for unplanned events <= 1 hour Not required for unplanned events <= 1 hour Planned Not required for unplanned events <=1 hour Not required for unplanned events <= 1 hour Planned Not required for unplanned events <= 1 hour BP EXPLORATION ALASKA, INC, CONSERVATION ORDER NO. 219 PRUDHOE BAY, COMBINED NIAKUK LISBURNE PRODUCTION CENTER GAS FLARING INCIDENTS Aug -15 VOLUME PLANNED DATE TIME (Mscf) DESCRIPTION OF INCIDENTS & CAUSE UNPLANNED ACTION TAKEN TO ELIMINATE CAUSE 8/4/2015 0823-0824 0 8/7/2015 1455- 1505 0 8/21/2015 0148-0152 1 Total Flare <=1 Hour 1 Total Flare> 1 Hour 0 Volume Flared 1 Measured Safety Pilot 32 Continuous Assist 452 TOTALFLARED 485 Not required for unplanned events <= 1 hour Planned Not required for unplanned events <= 1 hour Not required for unplanned events <= 1 hour Planned Not required for unplanned events <= 1 hour Not required for unplanned events <= 1 hour Planned Not required for unplanned events <= 1 hour BP EXPLORATION ALASKA, INC, CONSERVATION ORDER NO. 219 PRUDHOE BAY, RAVEN LISBURNE PRODUCTION CENTER GAS FLARING INCIDENTS Aug -15 VOLUME PLANNED DATE TIME )Mscf) DESCRIPTION OF INCIDENTS & CAUSE UNPLANNED ACTION TAKEN TO ELIMINATE CAUSE 8/4/2015 0823-0824 0 8/7/2015 1455-1505 0 8/21/2015 0148-0152 0 Total Flare <=1 Hour 0 N Total Flare > 1 Hour 0 Volume Flared 0 Measured Safety Pilot 7 Continuous Assist 93 TOTAL FLARED 100 Not required for unplanned events <- 1 hour Planned Not required for unplanned events <= 1 hour Not required for unplanned events <= 1 hour Planned Not required for unplanned events <= 1 hour Not required for unplanned events <- 1 hour Planned Not required for unplanned events <= 1 hour BP EXPLORATION ALASKA, INC, CONSERVATION ORDER NO. 219 PRUDHOE BAY, PRUDHOE LISBURNE PRODUCTION CENTER GAS FLARING INCIDENTS Aug -15 VOLUME PLANNED DATE TIME (Mscf) DESCRIPTION OF INCIDENTS & CAUSE UNPLANNED ACTION TAKEN TO ELIMINATE CAUSE 8/4/2015 0823-0824 1 8/7/2015 1455-1505 14 8/21/2015 0148-0152 26 Total Flare <=1 Hour 41 Total Flare> 3 Hour 0 Volume Flared 41 Measured Safety Pilot 973 Continuous Assist 13,789 TOTAL FLARED 14,803 Not required for unplanned events <= 1 hour Planned Not required for unplanned events <= 1 hour Not required for unplanned events <= 1 hour Planned Not required for unplanned events <= 1 hour Not required for unplanned events <= 1 hour Planned Not required for unplanned events <= 1 hour BP EXPLORATION ALASKA, INC, CONSERVATION ORDER NO. 219 PRUDHOE BAY, NORTH PRUDHOE BAY LISBURNE PRODUCTION CENTER GAS FLARING INCIDENTS Aug -15 VOLUME PLANNED DATE TIME (MSCF) DESCRIPTION OF INCIDENTS & CAUSE UNPLANNED ACTION TAKEN TO ELIMINATE CAUSE Total Flare <=1 Hour 0 Total Flare > 1 Hour 0 Volume Flared Measured Safety Pilot 0 Continuous Assist 0 TOTAL FLARED BP EXPLORATION ALASKA, INC, CONSERVATION ORDER NO. 219 PRUDHOE BAY, WEST BEACH LISBURNE PRODUCTION CENTER GAS FLARING INCIDENTS Aug -15 VOLUME PLANNED DATE TIME (MSCF) DESCRIPTION OF INCIDENTS & CAUSE UNPLANNED ACTION TAKEN TO ELIMINATE CAUSE Total Flare <=1 Hour Total Flare > 1 Hour 0 Volume Flared Measured Safety Pilot Continuous Assist TOTAL FLARED STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMMISSION FACILITY REPORT OF PRODUCED GAS DISPOSITION 1. Facility Number 0290000009 2. Facility Name PBU LISBURNE PROD GPMA 3. Field PBU - GPMA 4. Operator 5. MonMear of Disposition BP I September -201 5 Disposition Volume MCF 20. Forproduction from multiple pools, list contribution of each pool as a percent or Total Volume. 6. Sold 19,800 Pool Name Pool Code Percent 7. Reinjected 8,264,156 Lisburne 640144 24.4% Niakuk 640148 0.8% B. Flared or vented 1 hour or less 358 North Prudhoe Bay State 640152 0.0% Sadlerochit 640150 4.8% 9. Flared or vented more than 1 hour (see instr.) O Point McIntyre 640180 70.0% Ivishak-SagRiver test in GPMA 640147 0.0% 10. Pilot and Purge 11,292 West Beach 640186 0.0% 11. Assist Gas 157,491 12. Fuel gas used in lease operations. 674,012 13. Other (see Instructions) 132,779 Official Use Only Authorization >1 hr. Safety MCF 14. TOTAL VOLUME (ITEMS 6-12) 9,259,888 Lease Use MCF 15. NGL Gas Equivalent 19,800 Conservation MCF 16. Purchased gas 0 Waste: MCF 17. Transferred from: 1,070,207 Commissioner Date 16. Transferred to: (Express as a negative #) 0 19. Remarks: Block 13: Lift Gas Off Field; Block 17: Ml from Prudhoe = 1,070,207 and Fuel Gas from Prudhoe = 0 1 hereby certify that the foregoing is true and correct to the best of my knowledge. Nota: All volumes must be corrected Signature 66CCY// OL Tine Manager Production Taxes and Ro alties Alaska to pressure of 14.65 psis and to a temperature of 60o F. Authority 20 Printed Name Diane Colley Phone (907) 564-5775 Date AAC25.235. Form 10-422 Rev. 5/2009 INSTRUCTIONS ON REVERSE SIDE Submit in Duplicate BP EXPLORATION ALASKA, INC, CONSERVATION ORDER NO. 219 PRUDHOE BAY, LISBURNE LISBURNE PRODUCTION CENTER GAS FLARING INCIDENTS Sep -15 VOLUME PLANNED DATE TIME (MSCF) DESCRIPTION OF INCIDENTS & CAUSE UNPLANNED ACTION TAKEN TO ELIMINATE CAUSE 9/6/2015 0105-0110 55 9/9/2015 1927-2005 15 Total Flare <=1 Hour 70 Total Flare > 1 Hour Volume Flared 70 Measured Safety Pilot 2,773 Continuous Assist 38,678 TOTAL FLARED 41,521 1808 Reinjection Compressor shut -down for maintenance Planned Flare valve closed Not required for unplanned events <=1 hour Unplanned Not required for unplanned events <=1 hour BP EXPLORATION ALASKA, INC, CONSERVATION ORDER NO. 219 PRUDHOE BAY, POINT MCINTYRE LISBURNE PRODUCTION CENTER GAS FLARING INCIDENTS Sep -15 VOLUME PLANNED DATE TIME (MSCF( DESCRIPTION OF INCIDENTS & CAUSE UNPLANNED ACTION TAKEN TO ELIMINATE CAUSE 9/6/2015 0105-0110 237 9/9/2015 1927-2005 51 Total flare <=1 Hour 288 Total Flare > 1 Hour 0 Volume Flared 288 Measured SafetV Pilot 7,889 Continuous Assist 110,048 TOTALFLARED 118,225 1808 Reinjection Compressor shut -down for maintenance Planned Flare valve closed Not required for unplanned events <=1 hour Unplanned Not required for unplanned events <=1 hour BP EXPLORATION ALASKA, INC, CONSERVATION ORDER NO. 219 PRUDHOE BAY, COMBINED NIAKUK LISBURNE PRODUCTION CENTER GAS FLARING INCIDENTS Sep -SS VOLUME PLANNED DATE TIME (Mscf( DESCRIPTION OF INCIDENTS & CAUSE UNPLANNED ACTION TAKEN TO ELIMINATE CAUSE 9/6/2015 0105-0110 9/9/2015 1927-2005 Total Flom r-1 Hour 0 Total Flom > 1 Hour Volume Flared Measured Safety Pilot 90 Continuous Assist 1,251 TOTAL FLARED 1,341 1808 Reinjection Compressor shut -down for maintenance Planned Flare valve closed Not required for unplanned events <=1 hour Unplanned Not required for unplanned events <= 1 hour RP EXPLORATION ALASKA, INC, CONSERVATION ORDER NO. 219 PRUDHOE BAY, RAVEN LISBURNE PRODUCTION CENTER GAS FLARING INCIDENTS Sep -15 VOLUME PLANNED DATE TIME (Mscf) DESCRIPTION OF INCIDENTS & CAUSE UNPLANNED ACTION TAKEN TO ELIMINATE CAUSE 9/6/2015 0105-0110 9/9/2015 1927-2005 Total Flom <=1 Hour Total Flare > 1 Hour 0 Volume Flared 0 Measured Safety Pilot 0 Continuous Assist 0 TOTAL FLARED 0 1809 Reinjection Compressor shut -down for maintenance Planned Flare valve closed Not required for unplanned events <= 1 hour Unplanned Not required for unplanned events <= 1 hour BP EXPLORATION ALASKA, INC, CONSERVATION ORDER NO. 219 PRUDHOE BAY, PRUDHOE LISBURNE PRODUCTION CENTER GAS FLARING INCIDENTS Sep -15 VOLUME PLANNED DATE TIME (Mscf) DESCRIPTION OF INCIDENTS & CAUSE UNPLANNED ACTION TAKEN TO ELIMINATE CAUSE 9/6/2015 0105-0110 9/9/2015 1927-2005 Total Flom <=1 Hour 0 Total Flom > 1 Hour 0 Volume Flared 0 Measured Safety Pilot 540 Continuous Assist 7,514 TOTAL FLARED 8,054 1808 Reinjection Compressor shut -down for maintenance Planned Flare valve closed Not required for unplanned events <= 1 hour Unplanned Not required for unplanned events <= 1 hour BP EXPLORATION ALASKA, INC, CONSERVATION ORDER NO. 219 PRUDHOE BAY, NORTH PRUDHOE BAY LISBURNE PRODUCTION CENTER GAS FLARING INCIDENTS Sep -15 VOLUME PLANNED DATE TIME (MSCF( DESCRIPTION OF INCIDENTS & CAUSE UNPLANNED ACTION TAKEN TO ELIMINATE CAUSE Total Flare <=1 Hour Total Flom> 1 Hour Volume Flared Measured Safety Pilot 0 Continuous Assist 0 TOTALFLARED 0 SP EXPLORATION ALASKA, INC, CONSERVATION ORDER NO. 219 PRUDHOE BAY, WEST BEACH LISBURNE PRODUCTION CENTER GAS FLARING INCIDENTS Sep -15 VOLUME PLANNED DATE TIME (MSCF) DESCRIPTION OF INCIDENTS & CAUSE UNPLANNED ACTION TAKEN TO ELIMINATE CAUSE Total Flare <-1 Hour 0 Total Flare > I Hour 0 Volume Flared 0 Measured Safety Pilot 0 Continuous Assist 0 TOTALFLARED 0 STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMMISSION FACILITY REPORT OF PRODUCED GOS nispnciTilnti 1. Facility Number 2. Facility Name 0290000009 PBU LISBURNE PROD GPMA Disposition 3, Field PBU - GPMA Volume MCF 4. Operator 5. Monthfyear of Disposition BP October -2015 20. For production from multiple pools, list contribution of each pool as a percent of Total Volume. 6. Sold 85,862 Pool Name Pool Code Percent 7. Reinjected 8,614,936 Lisburne 640144 33.6% West Beach 640186 0.0% 8. Flared or vented 1 hour or less 334 ✓ Sadlerochit 640150 4.8% Niakuk 640148 0.9% 9. Flared or vented more than 1 hour (see instr.) 8,759/ Ivishak-Saq River test in 640147 0.1% Point McIntyre 640180 60.7% 10. Pilotand Purge 111585 North Prudhoe Bay State 1 640152 0.0% 11. Assist Gas 165,841 12. Fuel gas used in lease operations. 731,103 13. Other (see instructions) 184,755- Offloial Use Only ' Authorization >1 hr: Safety MCF 14, TOTAL VOLUME (ITEMS 6-12) 9,803,175 Lease Use MCF 15. NGL Gas Equivalent 85,862 Conservation MCF 16. Purchased gas 0 Waste: MCF 17. Transferred from: 1,057,606. ay 1Z—/4 —/S Commissioner Date 18. Transferred to: (Express as a negative #) 0 19. Remarks: Block 13: Lift Gas Off Field; Block 17: Ml from Prudhoe = 1,057,493 and Fuel Gas from Prudhoe = 113 I hereby cerlity that the foregoing is true and correct to the best of my knowledge. ���� Note: All volumes must be corrected Signature -vim/ Title Manager Production Taxes and Royalties Alaska to pressure of 14.65 psia and to a temperature of 60o F. Authority 20 Printed Name Diane ColleyPhone (907) 564-5775 Date AAC25.235. V%L tz115-1r5- Form 10-422 Rev. 5/2009 INSTRUCTIONS ON REVERSE SIDE Submit in Duplicate BP EXPLORATION ALASKA, INC, CONSERVATION ORDER NO. 219 PRUDHOE BAY, LISBURNE LISBURNE PRODUCTION CENTER GAS FLARING INCIDENTS OR -15 VOLUME PLANNED DATE TIME (Ml DESCRIPTION OF INCIDENTS & CAUSE UNPLANNED ACTION TAKEN TO ELIMINATE CAUSE 10/10/2015 1740-1744 131 1807 Reinjection compressor shutdown for Cassis Testing Planned 1807 T/C depressurized and shut down 1807 Reinjection compressor shutdown because of Started off-line T/C and stabilized facility 10/12/2015 1329-1339 0 control/instrumentation failure Planned process and operation 1855 Depropanizer Off Gas compressor shutdown because of Flare valve closed after the switchgear was 10/15/2015 1403 -1412 8 an electrical power bump Unplanned reset and 1855 was started and loaded Flare valve closed after 1855 lubricator; 1855 Depropanizer Off Gas compressor shutdown because of a were pumped up and 1855 was restarted 10/15/2015 1502-1510 8 low pressure trip of its lubricator system Unplanned and loaded Total Flare <=1 Hour 147 10/6/2015 2225-0022 2,279 10/17/2015 1143-1313 147 Total Flare > 1 Hour 2,426 Volume Flared 2,573 Measured Safely Pilot 4,014 Continuous Assist 57,339 TOTAL FLARED 63,926 1808 Reinjection compressor shutdown because of control/Instrumentation failure associated with 38LO03-SH 1800 STV -IP compressor shutdown because of control/instrmentation failure associated with IP suction pressure switch Reduced production rates and shut-in wells Unplanned equaling 200 mscfd starting 20/623:10. Flaring was premitted to continue while operations personnel attempted to restart Unplanned the equipment BP EXPLORATION ALASKA, INC, CONSERVATION ORDER NO. 219 PRUDHOE BAY, POINT MCINTYRE LISBURNE PRODUCTION CENTER GAS FLARING INCIDENTS Ott -15 Total Flare <=1 Hour 155 1808 Reinjection compressor shutdown because of Reduced production rates and shut-in wells 10/6/2015 2225-0022 5,563 control/instrumentation failure associated with 38L003 -SH Unplanned equaling 200 mscfd starting 10/6 23:10. 1800 STV -IP compressor shutdown because of Flaring was premitted to continue while control/instrmentation failure associated with IP suction operations personnel attempted to restart 10/17/2015 1143-1313 298 pressure switch Unplanned the equipment Total Flare> 1 Hour 5,861 Volume Flared 6,016 Measured Safety Pilot 6,846 Continuous Assist 98,069 TOTAL FLARED 110,931 VOLUME PLANNED DATE TIME (ll DESCRIPTION OF INODENTS b CAUSE UNPLANNED ACTION TAKEN TO ELIMINATE CAUSE 10/10/2015 1740-1744 126 1807 Reinjection compressor shutdown for Cassis Testing Planned 1807 TIC depressurized and shut down 1807 Reinjection compressor shutdown because of Started off-line T/C and stabilized facility 10/12/2015 1329-1339 1 control/instrumentation failure Planned process and operation 1855 Depropanizer Off Gas compressor shutdown because of Flare valve closed after the switchgear was 10/15/2015 1403-1412 14 an electrical power bump Unplanned reset and 1855 was started and loaded Flare valve closed after 1855 lubricators 1855 Depropanizer Off Gas compressor shutdown because of were pumped up and 1855 was restarted 10/15/2015 1502-1510 14 a low pressure trip of its lubricator system Unplanned andloaded Total Flare <=1 Hour 155 1808 Reinjection compressor shutdown because of Reduced production rates and shut-in wells 10/6/2015 2225-0022 5,563 control/instrumentation failure associated with 38L003 -SH Unplanned equaling 200 mscfd starting 10/6 23:10. 1800 STV -IP compressor shutdown because of Flaring was premitted to continue while control/instrmentation failure associated with IP suction operations personnel attempted to restart 10/17/2015 1143-1313 298 pressure switch Unplanned the equipment Total Flare> 1 Hour 5,861 Volume Flared 6,016 Measured Safety Pilot 6,846 Continuous Assist 98,069 TOTAL FLARED 110,931 BP EXPLORATION ALASKA, INC, CONSERVATION ORDER NO. 219 PRUDHOE BAY, COMBINED NIAKUK LISBURNE PRODUCTION CENTER GAS FLARING INCIDENTS Oct -15 Total Flare <=1 Hour 2 1808 Reinjection compressor shutdown because of 10/6/2015 2225-0022 43 control/instrumentation failure associated with 38L.003 -SH 1800 STV -IP compressor shutdown because of control/instrmentation failure associated with IP suction 10/17/2015 1143-1313 4 pressure switch Total Flare> 1 Hour 47 Volume Flared 49 Measured Safety Pilot 109 Continuous Assist 1,559 TOTAL FLARED 1,717 Reduced production rates and shut-in wells Unplanned equaling 200 mscfd starting 10/623:10. Flaring was premitted to continue while operations personnel attempted to restart Unplanned the equipment VOLUME PLANNED DATE TIME (Mscf) DESCRIPTION OF INCIDENTS & CAUSE UNPLANNED ACTION TAKEN TO ELIMINATE CAUSE 10/10/2015 1740-1744 1 1807 Reinjection compressor shutdown for Cassis Testing Planned 1807 T/C depressurized and shut down 1807 Reinjection compressor shutdown because of Started off-line T/C and stabilized facility 10/12/2015 1329-1339 0 control/instrumentation failure Planned process and operation 1855 Depropanizer Off Gas compressor shutdown because of Flare valve closed after the switchgear was 10/15/2015 1403-1412 1 an electrical power bump Unplanned reset and 1855 was started and loaded Flare valve closed after 1855 lubricators 1855 Oepropanizer Off Gas compressor shutdown because of were pumped up and 1855 was restarted 10/15/2015 1502 - 1510 0 a low pressure trip of its lubricator system Unplanned and loaded Total Flare <=1 Hour 2 1808 Reinjection compressor shutdown because of 10/6/2015 2225-0022 43 control/instrumentation failure associated with 38L.003 -SH 1800 STV -IP compressor shutdown because of control/instrmentation failure associated with IP suction 10/17/2015 1143-1313 4 pressure switch Total Flare> 1 Hour 47 Volume Flared 49 Measured Safety Pilot 109 Continuous Assist 1,559 TOTAL FLARED 1,717 Reduced production rates and shut-in wells Unplanned equaling 200 mscfd starting 10/623:10. Flaring was premitted to continue while operations personnel attempted to restart Unplanned the equipment BP EXPLORATION ALASKA, INC, CONSERVATION ORDER NO. 219 PRUDHOE BAY, RAVEN LISBURNE PRODUCTION CENTER GAS FLARING INCIDENTS Oct -is Total Flare s= I Hour 0 1808 Reinjection compressor shutdown because of 10/6/2015 2225-0022 0 control/instrumentation failure associated with 38L003 -SH 1800 STVAP compressor shutdown because of control/instrmentation failure associated with IP suction 10/17/2015 1143-1313 0 pressure switch Total Flare> I Hour 0 Volume Flared 0 Measured Safety Pilot e Continuous Assist 114 TOTAL FLARED 122 Reduced production rates and shut-in wells Unplanned equaling 200 mscfd starting 30/6 23:10. Flaring was premitted to continue while operations personnel attempted to restart Unplanned the equipment VOLUME PLANNED DATE TIME (Mscf( DESCRIPTION OF INCIDENTS& CAUSE UNPLANNED ACTON TAKEN TO ELIMINATE CAUSE 10/10/2015 1740-1744 0 1807 Reinjection compressor shutdown for Cassis Testing Planned 1807 T/C depressurized and shut down 1807 Reinjection compressor shutdown because of Started off-line T/C and stabilized facility 10/12/2015 1329-1339 0 control/instrumentation failure Planned process and operation 1855 Depropanizer Off Gas compressor shutdown because of Flare valve closed after the switchgear was 10/15/2015 1403-1412 0 an electrical power bump Unplanned reset and 1855 was started and loaded Flare valve closed after 1855 lubricators 1855 Depropanizer Off Gas compressor shutdown because of were pumped up and 1855 was restarted 10/15/2015 1502 - 1510 0 a low pressure trip of its lubricator system Unplanned and loaded Total Flare s= I Hour 0 1808 Reinjection compressor shutdown because of 10/6/2015 2225-0022 0 control/instrumentation failure associated with 38L003 -SH 1800 STVAP compressor shutdown because of control/instrmentation failure associated with IP suction 10/17/2015 1143-1313 0 pressure switch Total Flare> I Hour 0 Volume Flared 0 Measured Safety Pilot e Continuous Assist 114 TOTAL FLARED 122 Reduced production rates and shut-in wells Unplanned equaling 200 mscfd starting 30/6 23:10. Flaring was premitted to continue while operations personnel attempted to restart Unplanned the equipment BP EXPLORATION ALASKA, INC, CONSERVATION ORDER NO. 219 PRUDHOE BAY, PRUDHOE LISBURNE PRODUCTION CENTER GAS FLARING INCIDENTS Oct -15 Total Fare r-1 Hour 30 1808 Reinjection compressor shutdown because of VOLUME 10/6/2015 2225-0022 403 control/instrumentation failure associated with 38LO03-SH Unplanned PLANNED 1800 STV -IP compressor shutdown because of DATE TIME (Mscf( DESCRIPTION OF INCIDENTS & CAUSE UNMANNED ACTION TAKEN TO ELIMINATE CAUSE 10/10/2015 1740-1744 27 1807 Reinjection compressor shutdown for Cassis Testing Planned 1807 T/C depressurized and shut down 1807 Reinjection compressor shutdown because of Started off-line T/C and stabilized facility 10/12/2015 1329-1339 0 control/Instrumentation failure Planned process and operation 1855 Depropanizer Off Gas compressor shutdown because of Flare valve closed after the switchgear was 10/15/2015 1403-1412 2 an electrical power bump Unplanned reset and 1855 was started and loaded Flare valve closed after 1855 lubricators 1855 Depropanizer Off Gas compressor shutdown because of a were pumped up and 1855 was restarted 10/15/2015 1502-1510 1 low pressure trip of its lubricator system Unplanned andloaded Total Fare r-1 Hour 30 1808 Reinjection compressor shutdown because of Reduced production rates and shut-in wells 10/6/2015 2225-0022 403 control/instrumentation failure associated with 38LO03-SH Unplanned equaling 200 mscfd starting 10/6 23:10. 1800 STV -IP compressor shutdown because of Flaring was premitted to continue while control/instrmentation failure associated with IP suction operations personnel attempted to restart 10/17/2015 1143-1313 22 pressure switch Unplanned the equipment Total Flare > 1 Hour 425 Volume Flared 455 Measured Safety Pilot 608 Continuous Assist 8,760 TOTAL FLARED 9,823 BP EXPLORATION ALASKA, INC, CONSERVATION ORDER NO. 219 PRUDHOE BAY, NORTH PRUDHOE BAY LISBURNE PRODUCTION CENTER GAS FLARING INCIDENTS Oct -1S VOLUME PLANNED DATE TIME )MSCF) DESCRIPTION OF INCIDENTS & CAUSE UNPLANNED ACTION TAKEN TO ELIMINATE CAUSE Total Flare c=1 Hour 0 Total Flare > 1 Hour Volume Flared 0 Measured Safety Pilot Continuous Assist TOTAL FLARED 0 BP EXPLORATION ALASKA, INC, CONSERVATION ORDER NO. 219 PRUDHOE BAY, WEST BEACH LISBURNE PRODUCTION CENTER GAS FLARING INCIDENTS Oct -is VOLUME PLANNED DATE TIME (MSCF) DESCRIPTION OF INCIDENTS & CAUSE UNPLANNED ACTION TAKEN TO ELIMINATE CAUSE Total Flare . I Hour Total Flare> 1 Hour Volume Flared Measured Safety Pilot Continuous Assist TOTALFLARED a 11/20/2015 Flaring Event at LPC Flaring Event at LPC AK, OPS PCC EOC TL [AKOPSPCCEOCTL@bp.com] Sent:Sunday, November 08, 2015 6:44 PM To: AOGCC Reporting (DOA sponsored) Cc: Loepp, Victoria T (DOA); Benson, Gary A [Gary.Benson@bp.com]; Arthur, Gregory [Gregory.Arthur@bp.com]; AK, OPS GC3&PCC OSM [AKOPSGC3PCCOSM@BP.com]; Martin, Nelson D [Nelson.Martin@bp.com]; AK, HSSEE Env Adv East [AKHSSEEEnvAdvEast@bp.com]; AK, OPS GPMA Facility OTL [AKOPSGPMAFacilityOTL@bp.com]; AK, OPS GPMA OSM [AKOPSGPMAOSM@BP.com]; Glover, Robin (SLR) [Robin.Glover@bp.com] To: AOGCC Reporting CC: Victoria Loepp, AOGCC aogcc.reoorting(Walaska. iov From: David Spall, GPB Production Optimization Team Leader A flaring event occurred at LPC starting at 10/17/2015 11:43 and stopping at 10/17/2015 13:13 with a volume of 471 (MSCF). The event was a black smoke event. The event lasted for 90 minutes and was due to 1800 STV -IP compressor shutdown because of control/instrumentation failure associated with the IP suction pressure switch. The flaring stopped once the compressor was restarted. Thanks, David Spall (Alternate—Jennifer Blake) PCC/EOC Production Optimization Team Lead 907-659-4472 Office 219-689-4036 Cell david.soall ffift.com https://webmaile.alaska.gmfowat?ae= Item&t=IPM.Note&irk RgAAAABKLne2zgP4SoMkep0hCxbSBwBUvQ964rjQTgYgn3632GdIAAAAhhLyAABUvQ964rjQT... 1/1 11/25/2015 RE: Flaring Event at LPC- Enterprise Vault Archived Item From AK, OPS PCC EOC TL Date 10/19/2015, 12:23:00 PM To AOGCC Reporting (DOA sponsored) Cc Loepp, Victoria T (DOA); Benson, Gary A; Arthur, Gregory; AK, OPS GC3&PCC OSM; Martin, Nelson D; AK, HSSEE Env Adv East; AK, OPS GPMA Facility OTL; AK, OPS GPMA OSM; Glover, Robin (SLR) Subject RE: Flaring Event at LPC To: AOGCC Reporting CC: Victoria Loepp, AOGCC aoacc reoortingea alaska.aov From: Jennifer Blake, GPB Production Optimization Team Leader Correction to the 10/6/15 LPC Flaring Report: A flaring event occurred at LPC starting at 10/06/2015 22:25 and continued on into 10/7/2015. The event was not a black smoke event and was due to 1808 reinjection compressor shutdown from a control./instrumentation failure associated with a high level switch. The flaring stopped once production rates were reduced sufficiently. Volumes and timeframe for each day are as follows: • 10/06/2015 22:25 to 23:59 had a volume of 7953 (MSCF). The event lasted for 95 minutes The event had a volume greater than 5000 (MSCF) • 10/07/2015 00:00 to 00:22 had a volume of 335 (MSCF). The event lasted for 22 minutes. Thanks, Jennifer Blake PCC/EOC Production Optimization Team Lead (alt David Spall) Office (907) 659-4472 Cell (907) 830-6204 Jennifer.blake@bp.com From: AK, OPS PCC EOC TL Sent: Friday, October 16, 2015 2:45 PM To: 'aogcc.reporting@alaska.gov' Cc: 'Loepp, Victoria T (DOA) (victoria.loepp@alaska.gov)'; Benson, Gary A; Arthur, Gregory; AK, OPS GC3&PCC OSM; Martin, Nelson D; AK, HSSEE Env Adv East; AK, OPS GPMA Facility OTL; AK, OPS GPMA OSM; Glover, Robin (SLR) Subject: Flaring Event at LPC To: AOGCC Reporting CC: Victoria Loepp, AOGCC aoacc reoorting@alaska gov From: Jennifer Blake, GPB Production Optimization Team Leader A flaring event occurred at LPC starting at 10/06/2015 22:25 and stopping at 10/06/2015 23:59 with a volume of 7935 (MSCF). The event was a black smoke event. The event lasted for 94 minutes. The event had a volume greater than 5000 (MSCF) and was due to 1808 reinjection compressor shutdown from a rnntrnl /i net. imenfntinn foihire eenriof,rl n,ifh n Minh level muifrh The florin efnnnerl nnre nrnrliirtinn rofee hfps://ancevO2.sw.alaska.gov/EnterpriseVaul VV!mMessage.asp?Vaultld=1870ADEC3E0501 E4AB013887467C F6E0BA1110000Jnuev02&Savesetld=20151120... 1/1 11/25/2015 Flaring Event at LPC- Enterprise Vault Archived Item From AK, OPS PCC EOC TL Date 10/16/2015, 2:45:34 PM To AOGCC Reporting (DOA sponsored) Cc Loepp, Victoria T (DOA); Benson, Gary A; Arthur, Gregory; AK, OPS GC3&PCC OSM; Martin, Nelson D; AK, HSSEE Env Adv East; AK, OPS GPMA Facility OTL; AK, OPS GPMA OSM; Glover, Robin (SLR) Subject Flaring Event at LPC To: AOGCC Reporting CC: Victoria Loepp, AOGCC aogcc.reporting@alaska.gov From: Jennifer Blake, GPB Production Optimization Team Leader A flaring event occurred at LPC starting at 10/06/2015 22:25 and stopping at 10/06/2015 23:59 with a volume of 7935 (MSCF). The event was a black smoke event. The event lasted for 94 minutes. The event had a volume greater than 5000 (MSCF) and was due to 1808 reinjection compressor shutdown from a control./instrumentation failure associated with a high level switch. The flaring stopped once production rates were reduced sufficiently. Thanks Jennifer Blake PCC/EOC Production Optimization Team Lead (alt David Spall) Office (907) 659-4472 Cell (907) 830-6204 Jennifer.blake@bp.com httpsJ/ancevO2.soa.alaska.gw/EnterpriseVaulVVimMessage.aspWaultld=1870ADEC3E0501 E4A30D8874B7CF6E0BA1110000jnuev02&Savesetld=20151118... 111 STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMMISSION FACILITY REPORT OF PRODUCED GAS DISPOSITInN 1. Facility Number 0290000009 2. Facility Name PBU LISBURNE PROD GPMA 3. Field PBU - GPMA 4. Operator BP 5. MonthNear of Disposition November -2015 Disposition Volume MCF 20. For production from multiple pools, list contribution of each pool as a percent of Total Volume. 6. Sold 96,904 Pool Name Pool Code Percent 7. Reinjected 11,236,633 Lisburne 640144 35.0% West Beach 640186 0.0% 8. Flared or vented 1 hour or less 75 Sadlerochit 640150 5.9% Niakuk 640148 0.5% 9. Flared or vented more than 1 hour (see instr.) 0 IVlshak-SagRiver test in 640147 1.3% North Prudhoe Bay State 640152 0.0% 10. Pilot and Purge 11,532 Point McIntyre 640180 57.3% 11. Assist Gas 118,582 12. Fuel gas used in lease operations. 858,798 13. Omer (see instructions) 145,736 Official Use Only Authorization >i hr: Safety MCF 14. TOTAL VOLUME (ITEMS 6.12) 12,468,260 Lease Use MCF 15. NGL Gas Equivalent 96,904 Conservation MCF 16. Purchased gas Waste: MCF 17. Transferred from: 1,474,405 Commissioner Date 18. Transferred to: (Express as a negative #) 0 19. Remarks: Block 13: Lift Gas Off Field; Block 17: MI from Prudhoe = 1,472,566 and Fuel Gas from Prudhoe = 1,839 1 hereby certify that theforegoing is true and correct to the best of my knowledge. Note: All volumes must be corrected Signature C.fLUt x+ Title Mana er Production Taxes and Ro allies Alaska t0 pressure of 14.65 psia and to a XW Printed Name Diane Colleytemperature of 60o F. Authority 20 Phone (907) 564-5775 Date % AAC25.235. Form 10422 Rev. 5/2009 INSTRUCTIONS ON REVERSE SIDE Submit in Duplicate BP EXPLORATION ALASKA, INC, CONSERVATION ORDER NO. 219 PRUDHOE BAY, LISBURNE LISBURNE PRODUCTION CENTER GAS FLARING INCIDENTS Nov -IS VOLUME PLANNED DATE TIME (MSCF) DESCRIPTION OF INCIDENTS & CAUSE UNPLANNED ACTION TAKEN TO ELIMINATE CAUSE 11/5/2015 1437-1451 15 Total Flare .I Hour 1s Total Flare > 1 Hour 0 Volume Flared 15 Measured Safety Pilot 3,977 Continuous Assist 39,066 TOTAL FLARED 43,058 Completed troubleshooting, reloaded 1800 T/C, and stabilized facility process and 1800 T/C shutdown because of low IP suction pressure Unplanned operation. BP EXPLORATION ALASKA, INC, CONSERVATION ORDER NO. 219 PRUDHOE BAY, POINT MCINTYRE LISBURNE PRODUCTION CENTER GAS FLARING INCIDENTS Nov -15 VOLUME PLANNED DATE TIME (MSCF) DESCRIPTION OF INCIDENTS & CAUSE UNPLANNED ACTION TAKEN TO ELIMINATE CAUSE 11/5/2015 1437-1451 57 Total Flare .I Hour 57 Total Flare > I Hour 0 Volume Flared 57 Measured Safety Pilot 6,663 Continuous Assist 72,136 TOTAL FLARED 78,856 Completed troubleshooting, reloaded 1800 T/C, and stabilized facility process and 1800 T/C shutdown because of low IP suction pressure Unplanned operation. BP EXPLORATION ALASKA, INC, CONSERVATION ORDER NO. 219 PRUDHOE BAY, COMBINED NIAKUK LISBURNE PRODUCTION CENTER GAS FLARING INCIDENTS Nov -15 VOLUME PLANNED DATE TIME IMSeF) DESCRIPTION OF INCIDENTS & CAUSE UNPLANNED ACTION TAKEN TO ELIMINATE CAUSE Total Flare m 1 Hour 0 Total Flare> I Hour Volume Flared Measured Safety Pilot 57 Continuous Assist 455 TOTALFLARED 512 BP EXPLORATION ALASKA, INC, CONSERVATION ORDER NO. 219 PRUDHOE BAY, RAVEN LISBURNE PRODUCTION CENTER GAS FLARING INCIDENTS Nov -15 VOLUME PLANNED DATE TIME (Mscf) DESCRIPTION OF INCIDENTS & CAUSE UNPLANNED ACTION TAKEN TO ELIMINATE CAUSE Total Flare <=1 Hour 0 Total Flare> 1 Hour Volume Flared Measured Safety Pilot 145 Continuous Assist 1,118 TOTALFLARED 1,263 BP EXPLORATION ALASKA, INC, CONSERVATION ORDER NO. 219 PRUDHOE BAY, PRUDHOE BURNIE PRODUCTION CENTER GAS FLARING INCIDENTS Nov -15 VOLUME PLANNED DATE TIME JIVIl DESCRIPTION OF INCIDENTS & CAUSE UNPLANNED ACTION TAKEN TO ELIMINATE CAUSE 11/5/2015 1437-1451 Total Flare <=1 Hour 3 Total Flare> 1 Hour 0 Volume Flared 3 Measured Safety Pilot 690 Continuous Assist 5,807 TOTAL FLARED 6,500 Completed troubleshooting, reloaded 1800 T/C, and stabilized facility process and 1800 T/C shutdown because of low IP suction pressure Unplanned operation. BP EXPLORATION ALASKA, INC, CONSERVATION ORDER NO. 219 PRUDHOE BAY, NORTH PRUDHOE BAY LISBURNE PRODUCTION CENTER GAS FLARING INCIDENTS Nov -15 VOLUME PLANNED DATE TIME (MSCF) DESCRIPTION OF INCIDENTS & CAUSE UNPLANNED ACTION TAKEN TO ELIMINATE CAUSE Total Flare <-1 Hour 0 Total Flare> 1 Hour Volume Flared Measured Safety Pilot 0 Continuous Assist 0 TOTALFLARED 0 BP EXPLORATION ALASKA, INC, CONSERVATION ORDER NO. 219 PRUDHOE BAY, WEST BEACH LISBURNE PRODUCTION CENTER GAS FLARING INCIDENTS Nov -15 VOLUME PLANNED DATE TIME (MSCF( DESCRIPTION OF INCIDENTS 9, CAUSE UNPLANNED ACTION TAKEN TO ELIMINATE CAUSE Total Flare <=1 Hour 0 Total Flare> 1 Hour Volume Flared Measured Safety Pilot 0 Continuous Assist 0 TOTALFLARED 0 STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMMISSION FACILITY REPORT OF PRODUCED GAS DISPOSITION 1. Facility Number 2. Facility Name 0290000009 PBU LISBURNE PROD GPMA Disposition 3. Field PBU - GPMA volume MCF 4. Operator 5. Month/Year of Disposition BP December -2015 20. For production from multiple pools, list contribution of each pool as a percent of Total volume. 6. Sold 108,513 Pool Name Pool Code Percent 7. Reinjected 11,656,006 Lisburne 640144 45.7% West Beach 640186 0.0% 8. Flared or vented 1 hour or less 0 Sadlerochit 640150 9.8% Niakuk 640148 0.9% 9. Flared or vented more than 1 hour (see instr.) 0 Ivishak-Sag River test in 640147 2.2% Point McIntyre 640180 41.4% 10. Pilot and Purge 11 746 North Prudhoe Ba State 640152 0.0% 11. Assist Gas 71,454 12. Fuel gas used in lease operations. 881,084 13. Other (see instructions) 178,360 Of rouse only Authorization hr: Safety MCF 14. TOTAL VOLUME (ITEMS 6-12) 12,907,163 Lease Use MCF 15. NGL Gas Equivalent 108,513 Conservation MCF 16. Purchased gas 0 Waste: MCF 17. Transferred from: 1,988,301 Commissioner Date 18. Transferred to: (Express as a negative #) 0 19. Remarks: Block 13: Lift Gas Off Field; Block 17: MI from Prudhoe = 1,988,301 and Fuel Gas from Prudhoe = 0 hereby certify That t foregoing is tru and correct the best of my knowledge. 11 ne Note: All volumes must be corrected Signature Title Manager Production Taxes a d Ro allies Alaska to pressure of 14.65 psia and to a Printed Name Diane Colley I jO temperature of 60o F. Authority 20 ( ) Phone 907 564-5775 Date ( AAC25.235. Form 10-422 Rev. 5/2009 INSTRUCTIONS ON REVERSE SIDE Submit in Duplicate BP EXPLORATION ALASKA, INC, CONSERVATION ORDER NO. 219 PRUDHOE BAY, COMBINED NIAKUK LISBURNE PRODUCTION CENTER GAS FLARING INCIDENTS Dec -15 VOLUME PLANNED DATE TIME (Mscf) DESCRIPTION OF INCIDENTS Be CAUSE UNPLANNED ACTION TAKEN TO ELIMINATE CAUSE Total Flare <=1 Hour 0 Total Flare > 1 Hour Volume Flared 0 Measured Safety Pilot 109 Continuous Assist 661 TOTALFLARED 770 SP EXPLORATION ALASKA, INC, CONSERVATION ORDER NO. 219 PRUDHOE BAY, RAVEN LISBURNE PRODUCTION CENTER GAS FLARING INCIDENTS Dec -15 VOLUME PLANNED DATE TIME (Ni DESCRIPTION OF INCIDENTS & CAUSE UNPLANNED ACTION TAKEN TO ELIMINATE CAUSE Total Flare <= 1 Hour Total Flare > 1 Hour Volume Flared Measured Safety Pilot 264 Continuous Assist 1,605 TOTALFLARED 1,869 BP EXPLORATION ALASKA, INC, CONSERVATION ORDER NO. 219 PRUDHOE BAY, PRUDHOE LISBURNE PRODUCTION CENTER GAS FLARING INCIDENTS Dec -15 VOLUME PLANNED DATE TIME (Mscf) DESCRIPTION OF INCIDENTS & CAUSE UNPLANNED ACTION TAKEN TO ELIMINATE CAUSE Total Flare <= 1 Hour 0 Total Flare n 1 Hour Volume Flared 0 Measured Safety Pilot 1,158 Continuous Assist 6,965 TOTAL FLARED 8,123 RP EXPLORATION ALASKA, INC, CONSERVATION ORDER NO. 219 PRUDHOE BAY, NORTH PRUDHOE BAY LISBURNE PRODUCTION CENTER GAS FLARING INCIDENTS Dec -15 VOLUME PLANNED DATE TIME (MSCF( DESCRIPTION OF INCIDENTS a CAUSE UNPLANNED ACTION TAKEN TO ELIMINATE CAUSE Total Fiore <= I Hour a Total Flare> 1 Hour Volume Flared Measured Safety Pilot Continuous Assist TOTALFLARED BP EXPLORATION ALASKA, INC, CONSERVATION ORDER NO. 219 PRUDHOE BAY, WEST BEACH LISBURNE PRODUCTION CENTER GAS FLARING INCIDENTS Deo -15 VOLUME PLANNED DATE TIME (MSCF) DESCRIPTION OF INCIDENTS & CAUSE UNPLANNED ACTION TAKEN TO ELIMINATE CAUSE Total Flare . I Hour 0 Total Flare> 1 Hour Volume Flared 0 Measured Safety Pilot 0 Continuous Assist 0 TOTALFLARED 0 RP EXPLORATION ALASKA, INC, CONSERVATION ORDER NO. 219 PRUDHOE BAY, POINT MCINTYRE LISBURNE PRODUCTION CENTER GAS FLARING INCIDENTS Dec -15 VOLUME PLANNED DATE TIME (MSCF) DESCRIPTION OF INCIDENTS 8 CAUSE UNPLANNED ACTION TAKEN TO ELIMINATE CAUSE Total Flare.1 Hour 0 Total Flare> 1 Hour Volume Flared Measured Safety Pilot 4,006 Continuous Assist 29,643 TOTAL FLARED 34,449 BP EXPLORATION ALASKA, INC, CONSERVATION ORDER NO. 219 PRUDHOE BAY, LISBURNE IURNE PRODUCTION CENTER GAS FLARING INCIDENTS Dec -15 VOLUME PLANNED DATE TIME (MSCF) DESCRIPTION OF INCIDENTS &CAUSE UNPLANNED ACTION TAKEN TO ELIMINATE CAUSE Total Flare <= 3 Hour Total Flare> 1 Hour Volume Flared Measured Safety Pilot 5,409 Continuous Assist 32,580 TOTAL FLARED 37,989