STATE OF ALASKA
RECEwE,D
FEB 19 2015
ALASKA OIL AND GAS CONSERVATION COMMISSION AOGGC
FACILITY REPORT OF PRODUCED GAS DISPOSITION V
1. Facility Number
0290000009
2. Facility Name
PBU LISBURNE PROD GPMA
3. Field
PBU - GPMA
4. Operator 5. Moni77ear of Disposition
BP I January -2015
Disposition
Volume MCF
20. For production from multiple pools, list contribution of each pool as a percent of Total
Volume.
6. Sold
108,066
Pool Name Pool Code Percent
7. Reinjected
11,615,342
Lisburne 640144 23.7%
Niakuk 640148 0.2%
8. Flared or vented 1 hour or less
0
North Prudhoe Bay State 640152 0.0%
Sadlerochit 640150 7.5%
9. Flared or vented more than 1 hour (see instr.)
0
Point McIntyre 640180 68.0%
Ivis hak-Sa River test in GPMA 640147 0.6%
10. Pilot and Purge
11,144
West Beach 640186 0.0%
11. Assist Gas
167,361
12. Fuel gas used in lease operations.
843,273
13. Other (see instructions)
208,587
Official Use Only
authorization >7 hr.
Safety
MCF
14. TOTAL VOLUME (ITEMS 6.12)
12,953,773
Lease Use
MCF
15. NGL Gas Equivalent
108,066
Conservation
MCF
16. Purchased gas
0
Waste:
MCF
17. Transferred from:
978,926
Commissioner Date
18. Transferred to: (Express as a negative #)
()
19. Remarks: Block 13: Lift Gas Off Field; Block 17: MI from Prudhoe = 978,908 and Fuel Gas from Prudhoe = 18
hereby certify that th foregoing is true and correct to the best of my knowledge.
Note: All volumes must be corrected
Signature Title Manager Production Taxes and Royalties Alaska to pressure of 14.65 psis and t0 a
U „ temperature of 60o F. Authority 20
Printed Name Diane Colley Phone (907) 564-5775 Date AAC25.235.
Form 10422 Rev. 5/2009 INSTRUCTIONS ON REVERSE SIDE Submit in Duplicate
STATE OF ALASKA
ALASKA OIL AND GAS CONSERVATION COMMISSION
FACILITY REPORT OF PRODUCED GAS DISPOSITION
1. Facility Number
0290000009
2. Facility Name
P13 LISBURNE PROD GPMA
3, Field
PBU - GPMA
4. Operator
BP
5. Month/Year of Disposition
I February -2015
Disposition
Volume MCF
20. Forproduction from multiple pools, list contribution of each pool as a percent of Total
Volume.
6. Sold
93,912
Pool Name Pool Code Percent
7, Reinjected
9,516,689
Lisburne 640144 25.0%
Niakuk 640148 0.2%
8. Flared or vented 1 hour or less
0
North Prudhoe Bay State 640152 0.0%
Sadlerochit 640150 5.0%
9. Flared or vented more than 1 hour (see instr.)
0
Point McIntyre 640180 69.3%
lvishak-SagRiver test in GPMA 640147 0.5%
10. Pilot and Purge
10,065
West Beach 640186 0.0%
11. Assist Gas
152,707
12. Fuel gas used in lease operations.
756,174
13. Other (see instructions)
142,005
Official Use Only
Authorization>1 hr:
Safety
MCF
14. TOTAL VOLUME (ITEMS 6-12)
10,671,552
Lease Use
MCF
15. NGL Gas Equivalent
93,912
Conservation
MCF
16. Purchased gas
0
Waste:
MCF
17. Transferred from:
624,226
Commissioner Date
18. Transferred to: (Express as a negative #)
O
19. Remarks: Block 13: Lift Gas Off Field; Block 17: M[ from Prudhoe = 624,226 and Fuel Gas from Prudhoe = 0
1 hereby certify that the foregoing is true and correct to the best of my knowledge.
0��9& Note: All volumes must be corrected
Signature .�,J�SK Title Mana er Production Taxes and Ro alties Alaska to pressure of 14.65 psia and to a
temperature of 60o F. Authority 20
Printed Name Diane Colley Phone (907) 564-5775 Date,_,'WX— AAC25.235.
Form 10-422 Rev. 512009 INSTRUCTIONS ON REVERSE SIDE Submit in Duplicate
STATE OF ALASKA
ALASKA OIL AND GAS CONSERVATION COMMISSION
FACILITY REPORT OF PRODUCED GAS DISPOSITION
1. Facility Number
0290000009
2. Facility Name
PBU LISBURNE PROD GPMA
3. Field
PBU - GPMA
4. Operator 5. MonthNear of Disposition
BP I March -2015
Disposition
Volume MCF
20. For production fmm multiple pools, list contribution of each pool as a percent of Total
Volume.
6. Sold
96,069
Pool Name Pool Code Percent
7. Reinjected
10,052,083
Lisburne 640144 25.5%
Niakuk 640148 0.3%
8. Flared or vented 1 hour or less
246
North Prudhoe Ba State 640152 0.0%
Sadlerochit 640150 5.8%
9. Flared or vented more than 1 hour (see instr.)
0
Point McIntyre 640180 68.0%
Ivishak-SagRiver test in GPMA 640147 0.5%
10. Pilot and Purge
11,138
West Beach 640186 0.0%
11. Assist Gas
166,461
12. Fuel gas used in lease operations.
810,372
13. Other (see instructions)
325,718
Official Use Only
Authorization >1 he
Safety
MCF
14. TOTAL VOLUME (ITEMS 6-12)
11,464,087
Lease Use
MCF
15. NGL Gas Equivalent
98,069
Conservation
MCF
16. Purchased gas
Waste:
MCF
17. Transferred from:
762,494
Commissioner Date
18. Transferred to: (Express as a negative #)
0
19 Remarks: Block 13: Lift Gas Off Field; Block 17: MI from Prudhoe = 762,494 and Fuel Gas from Prudhoe = 0
1 hereby certify that the foregoing is true and correct to the best of my knowledge.
�,f �' r,� Note: All volumes must be corrected
Signature �ii./',.L, _ ,AAS l Title Manager Production Taxes and Ro alties Alaska to pressure of 14.65 psia and to a
(V i,- temperature of 60o F. Authority 20
Printed Name Diane Colley Phone (907) 564-5775 Date ItL, ite) r AAC25.235.
Form 10-422 Rev. 5/2009 INSTRUCTIONS ON REVERSE SIDE Submit in Duplicate
STATE OF ALASKA
ALASKA OIL AND GAS CONSERVATION COMMISSION
FACILITY REPORT OF PRODUCED GAS DISPOSITION
RECEIVED
MAY 14 2015
AOGCC
1. Facility Number
0290000009
2. Facility Name
PBU LISBURNE PROD GPMA
3. Field
PBU - GPMA
4. Operator
BP
5. MonthNe%0.0%
Disposition
Volume MCF
20. Forproduction from multiple pools, list contribution of each potalVolume.
6. Sold
95,973
Pool Name PoolCodent7.
Reinjected
10,033,903
Lisburne 6401443%Niakuk
6401484%8.
Flared or vented 1 hour or less
0North
Prudhoe Ba State 6401520%
Sadlerochit 640150 7.5%
9. Flared or vented more than 1 hour (see instr.)
0
Point McIntyre 640180 57.2%
Ivishak-SagRiver test in GPMA 640147 0.5%
10. Pilot and Purge
10,7
West Beach 640186 0.0%
11. Assist Gas
165,377
12. Fuel gas used in lease operations.
821,599
13. Other (see instructions)
305,987
Official Use Only
Authorization >1 hr:
Safety
MCF
14. TOTAL VOLUME (ITEMS 6-12)
11,433,571
Lease Use
MCF
15, NGL Gas Equivalent
95,973
Conservation
MCF
16. Purchased gas
0
Waste:
MCF
17. Transferred from:
1,273788
Commissioner Date
18. Transferred to: (Express as a negative #)
19. Remarks: Block 13: Lift Gas Off Field; Block 17: MI from Prudhoe = 1,271,779 and Fuel Gas from Prudhoe = 2,009
1 hereby certify that t foregoing is true and correct to the best of my knowledge.
Note: All volumes must be corrected
Signature W/ Title Mana er Production Taxes and Ro aloes Alaska I to pressure of 14.65 psis and to a
3 temperature of 60o F. Authority 20
Printed Name Diane ColleyPhone (907) 564-5775 Date AAC25.235.
Form 10-422 Rev. 5/2009 INSTRUCTIONS ON REVERSE SIDE Submit in Duplicate
RECEIVED
JUN 15 2015
STATE OF ALASKA
ALASKA OIL AND GAS CONSERVATION COMMISSION AIOGCC
FACILITY REPORT OF PRODUCED GAS DISPOSITION
1. Facility Number
0290000009
2. Facility Name
PBU LISBURNE PROD (GPMA
3. Field
PBU - GPMA
4. Operator
BP
5. Month/Year of Disposition
May -2015I
Disposition
Volume MCF
20. Forproduction from multiple pools, list contribution of each pool as a percent of Total
Volume,
6. Sold
86,114
Pool Name Pool Code Percent
7. Reinjected
9,244,235
Lisburne 640144 29.7%
Niakuk 640148 1.2%
8. Flared or vented 1 hour or less
0
North Prudhoe Bay State 640152 0.0%
Sadlerochit 640150 8.1%
9. Flared or vented more than 1 hour (see instr.)
0
Point McIntyre 640180 60.3%
Ivishak-SagRiver test in GPMA 640147 0.7%
10. Pilot and Purge
10,923
West Beach 640186 0.0%
11, Assist Gas
169,937
12. Fuel gas used in lease operations.
784,526
13. Other (see instructions)
200,262
Official Use Only
Authorization>1 hr:
Safety
MCF
14. TOTAL VOLUME (ITEMS 6-12)
10,495,997
Lease Use
MCF
15. NGL Gas Equivalent
86,114
Conservation
MCF
16. Purchased gas
0
Waste:
MCF
17. Transferred from:
1,671,442
18. Transferred to: (Express as a negative #)
0
Commissioner Date
19. Remarks: Block 13: Lift Gas Off Field; Block 17: MI from Prudhoe = 1,667,106 and Fuel Gas from Prudhoe = 4,336
1 hereby certify that the foregoing is true and correct to the best of my knowledge.
�/yy�r Note: All volumes must be corrected
Signature ey � Title Mar er Production Taxes and Royalties Alaska to pressure of 14.65 psis and to a
temperature of 60o F. Authority 20
Printed Name Diane Colley Phone (907) 564-5775 Date / AAC25.235.
Form 10-422 Rev. 5/2009 INSTRUCTIONS ON REVERSE SIDE Submit in Duplicate
STATE OF ALASKA
ALASKA OIL AND GAS CONSERVATION COMMISSION
FACILITY REPORT OF PRODUCED GAS DISPOSITION
1. Facility Number
0290000009
2. Facility Name
PB LISBURNE PROD GPMA
3. Field
PBU - GPMA
4. Operator
BP
5. MonthNear of Disposition
I June -2015
Disposition
Volume MCF
20. Forproduction from multiple pools, list contribution of each pool as a percent of Total
Volume.
6. Sold
58,419
Pool Name Pool Code Percent
7. Reinjected
8,015,651
Lisburne 640144 30.2%
Niakuk 640148 1.0%
8 Flared or vented 1 hour or less
25
North Prudhoe Bay State 640152 0.0%
Sadlerochit 640150 8.9%
9. Flared or vented more than 1 hour (see instr.)
5,381
Point McIntyre 640180 59.6%
Ivishak-SagRiver test in GPMA 640147 0.3%
10. Pilotand Purge
10,704
West Beach 640186 1 0.0%
11. Assist Gas
184,094
12. Fuel gas used in lease operations.
716,194
13. Other (see instructions)
uctions)
171,271
Use Only
Authorization 11 hr
Safety
S3�
MCF
14. TOTAL VOLUME (ITEMS 6.12)
9,161,739
Lease Use
MCF
15. NGL Gas Equivalent
58,419
Conservation
MCF
16. Purchased gas
0
Waste:
MCF
17. Transferred from:
1,647,285
Commissioner Date
18. Transferred to: (Express as a negative #)
0
19. Remarks: Block 13: Lift Gas Off Field; Block 17: MI from Prudhoe = 1,646,327 and Fuel Gas from Prudhoe = 958
1 hereby certify that foregoing is true and correct to the best of my knowledge.
I U///yfn �I�f� Note: All volumes must be corrected
Signature CCCJJJIIIW/ Gi ls� Title Manager Production Taxes and Royalties Alaska to pressure of 14.65 psia and to a
temperature of 60o F. Authority 20
Printed Name Diane ColleyPhone (907) 564-5775 Date 6 AAC25.235.
rTL-
et / z/I i
Form 10-422 Rev. 512009 INSTRUCTIONS ON REVERSE SIDE Submit in Duplicate
BP EXPLORATION ALASKA, INC,
CONSERVATION ORDER NO. 219
PRUDHOE BAY, LISBURNE
LISBURNE PRODUCTION CENTER
GAS FLARING INCIDENTS
Jun -15
VOLUME PLANNED
DATE TIME (MSCF) DESCRIPTION OF INCIDENTS & CAUSE UNPLANNED ACTION TAKEN TO ELIMINATE CAUSE
6/15/2015 7 Not required for unplanned events <= 1 hour U Not required for unplanned events <= 1 hour
Total Flare <= 2 Hour 7
1,142 Depressured 24 common -line due to leak at drill site Ll via
6/6/2015 1600-2359 PSV bypass at LPC. U
1,697 Depressured 24 common -line due to leak at drill site Ll via
6/7/2015 0000-0530 PSV bypass at LPC. U
Total Flare> 1 Hour 2,839
Volume Flared
Measured Safety Pilot
3,788
Continuous Assist
70,224
TOTAL FLARED
76,858
BP EXPLORATION ALASKA, INC,
CONSERVATION ORDER NO. 219
PRUDHOE BAY, POINT MCINTYRE
LISBURNE PRODUCTION CENTER
GAS FLARING INCIDENTS
Jun -15
VOLUME PLANNED
DATE TIME (MSCF) DESCRIPTION OF INCIDENTS & CAUSE UNPLANNED ACTION TAKEN TO ELIMINATE CAUSE
6/15/2015 16 Not required for unplanned events <= 1 hour U Not required for unplanned events <= 1 hour
Total Flare <=1 Hour 16
1,739
6/6/2015 1600-2359
6/7/2015 0000-0530
Total Flare > 1 Hour 1,739
Volume Flared 1,755
Measured Safety Pilot
5,690
Continuous Assist
91,745
TOTAL FLARED
99,190
Depressured 24 common -line due to leak at drill site Ll via
PSV bypass at LPC. U
Depressured 24 common -line due to leak at drill site Ll via
PSV bypass at LPC. U
BP EXPLORATION ALASKA, INC,
CONSERVATION ORDER NO. 219
PRUDHOE BAY, COMBINED NIAKUK
LISBURNE PRODUCTION CENTER
GAS FLARING INCIDENTS
Jun -15
VOLUME PLANNED
DATE TIME (Mscf) DESCRIPTION OF INCIDENTS & CAUSE UNPLANNED ACTION TAKEN TO ELIMINATE CAUSE
6/15/2015 0 Not required for unplanned events <= 1 hour U Not required for unplanned events <= 1 hour
Total Flare <= 1 Hour 0
30 Depressured 24 common -line due to leak at drill site Ll via
6/6/2015 1600-2359 P5V bypass at LPC. U
55 Depressured 24 common -line due to leak at drill site Ll via
6/7/2015 0000-0530 PSV bypass at LPC. U
Total Flare > 1 Hour 85
Volume Flared 85
Measured Safety Pilot 121
Continuous Assist 2,223
TOTAL FLARED 2,429
BP EXPLORATION ALASKA, INC,
CONSERVATION ORDER N0. 219
PRUDHOE BAY, RAVEN
LISBURNE PRODUCTION CENTER
GAS FLARING INCIDENTS
Jun -15
VOLUME PLANNED
DATE TIME (Mscf) DESCRIPTION OF INCIDENTS & CAUSE UNPLANNED ACTION TAKEN TO ELIMINATE CAUSE
6/15/2015 0 Not required for unplanned events <= 1 hour
Total Flare <=1 Hour 0
12 Depressured 24 common -line due to leak at drill site Ll via
6/6/2015 1600-2359 PSV bypass at LPC.
19 Depressured 24 common -line due to leak at drill site L1 via
6/7/2015 0000-0530 PSV bypass at LPC.
Total Flare > 1 Hour 31
Volume Flared 31
Measured Safety Pilot 38
Continuous Assist 706
TOTALFLARED 775
U Not required for unplanned events <= 1 hour
U
U
BP EXPLORATION ALASKA, INC,
CONSERVATION ORDER NO. 219
PRUDHOE BAY, PRUDHOE
LISBURNE PRODUCTION CENTER
GAS FLARING INCIDENTS
Jun -15
VOLUME
1,067
PLANNED
19,196
DATE TIME (Mscf)
DESCRIPTION OF INCIDENTS & CAUSE
UNPLANNED
ACTION TAKEN TO ELIMINATE CAUSE
6/15/2015 2
Not required for unplanned events <= 1 hour
U
Not required for unplanned events <= 1 hour
Total Flare <= 1 Hour 2
266
6/6/2015 1600-2359
421
6/7/2015 0000-0530
Total Flare> 1 Hour 687
Volume Flared 689
Measured Safety Pilot
1,067
Continuous Assist
19,196
TOTAL FLARED
20,952
Depressured 24 common -line due to leak at drill site Ll via
PSV bypass at LPC. U
Depressured 24 common -line due to leak at drill site Ll via
PSV bypass at LPC. U
BP EXPLORATION ALASKA, INC,
CONSERVATION ORDER NO. 219
PRUDHOE BAY, NORTH PRUDHOE BAY
LISBURNE PRODUCTION CENTER
GAS FLARING INCIDENTS
Jun -15
Total Flare <=1 Hour 0
0
06/06/15 1600-2359
A
06/07/15 0000-0530
Total Flare > 1 Hour 0
Volume Flared 0
Measured Safety Pilot 0
Continuous Assist 0
TOTALFLARED 0
Depressured 24 common line due to leak at drill site Ll via
PSV bypass at LPC. U
Depressured 24 common -line due to leak at drill site Ll via
PSV bypass at LPC. U
VOLUME
PLANNED
DATE
TIME (MSCF(
DESCRIPTION OF INCIDENTS & CAUSE
UNPLANNED ACTION TAKEN TO ELIMINATE CAUSE
06/15/15
0
Not required for unplanned events <= 1 hour
U Not required for unplanned events <= 1 hour
Total Flare <=1 Hour 0
0
06/06/15 1600-2359
A
06/07/15 0000-0530
Total Flare > 1 Hour 0
Volume Flared 0
Measured Safety Pilot 0
Continuous Assist 0
TOTALFLARED 0
Depressured 24 common line due to leak at drill site Ll via
PSV bypass at LPC. U
Depressured 24 common -line due to leak at drill site Ll via
PSV bypass at LPC. U
BP EXPLORATION ALASKA, INC,
CONSERVATION ORDER NO. 219
PRUDHOE BAY, WEST BEACH
LISBURNE PRODUCTION CENTER
GAS FLARING INCIDENTS
Jun -15
Total Flare <=1 Hour 0
0 Depressured 24 common -line due to leak at drill site Ll via
06/06/15 1600-2359 PSV bypass at LPC. U
0 Depressured 24 common -line due to leak at drill site Ll via
06/07/15 0000-0530 PSV bypass at LPC. U
Total Flare > 1 Hour 0
Volume Flared 0
Measured Safety Pilot
VOLUME
Continuous Assist
PLANNED
DATE
TIME (MSCF)
DESCRIPTION OF INCIDENTS & CAUSE
UNPLANNED ACTION TAKEN TO ELIMINATE CAUSE
06/15/15
0
Not required for unplanned events <= 1 hour
U Not required for unplanned events <= 1 hour
Total Flare <=1 Hour 0
0 Depressured 24 common -line due to leak at drill site Ll via
06/06/15 1600-2359 PSV bypass at LPC. U
0 Depressured 24 common -line due to leak at drill site Ll via
06/07/15 0000-0530 PSV bypass at LPC. U
Total Flare > 1 Hour 0
Volume Flared 0
Measured Safety Pilot
0
Continuous Assist
0
TOTAL FLARED
0
Hunt, Jennifer L (DOA)
From: AK, OPS PCC EOC TL <AKOPSPCCEOCTL@bp.com>
Sent: Monday, June 08, 2015 6:21 AM
To: Loepp, Victoria T (DOA); Regg, James B (DOA)
Cc: AK, OPS GPMA Facility OTL; AK, OPS GPMA OSM; Loader, Neil; Leonard, Sean A;
Benson, Gary A; Arthur, Gregory; AK, HSSEE Env Adv East; AK, HSSEE Env TL (North
Slope); Hunt, Jennifer L (DOA); AK, OPS GC3&PCC OSM; Borton, Kim; Castano, Alejandra
Subject: GPMA LPC Ll Commonline Uncontrolled Release 5 Day Report
Attachments: _LPC Ll Gas Release 6-6-15 5 Day Report.pdf
Victoria Ferguson & Jim Regg,
This is a follow-up to the courtesy verbal notification made 6/07/13 to the Deadhorse AOGCC and email sent to
Mr. Regg.
Please find enclosed the 5 -day report for the release which occurred at GPMA LPC L1 Pad, on the L1/PtMac
commonline on 6/6/2015. This was also faxed to 907-276-7542.
Please give me a call if you have further questions. A 30 -day report will be provided after completion of the
incident investigation.
Regards,
Dave
David Spall (Alternate —Jennifer Blake)
PCC/EOC Production Optimization Team Lead
907-659-4472 Office
219-689-4036 Cell
david.spall@bo.com
Hunt, Jennifer L (DOA)
From: AK, OPS PCC EOC TL <AKOPSPCCEOCTL@bp.com>
Sent: Monday, June 08, 2015 5:28 PM
To: Hunt, Jennifer L (DOA)
Cc: Loepp, Victoria T (DOA); Castano, Alejandra; Benson, Gary A; Arthur, Gregory; AK, HSSEE
Env Adv West; AK, OPS GC3&PCC OSM; Borton, Kim; AK, OPS GPMA Facility OTL; AK,
OPS GPMA OSM
Subject: Flaring Event a
To: Jennifer Hunt, AOGCC CC: Victoria Ferguson, AOGCC
iennifer.huntnc alaska.00v victoria.ferouson o)alaska.gov
From: David Spall, GPB Production Optimization Team Leader
A flaring event occurred at LPC starting at 06/06/2015 16:00 and stopping at 06/06/2015 23:59 with a volume of 3189
(MSCF). The event lasted for 479 minutes and was due to De -pressuring 24 common -line due to leak at Drill Site L1. The
event stopped once the de -pressuring was completed and closed bypass once common -line reached 0 PSI
A flaring event occurred at LPC starting at 06/07/2015 00:00 and stopping at 06/07/2015 05:30 with a volume of 2192
(MSCF). The event lasted for 330 minutes and was due to De -pressuring 24 common -line due to leak at Drill Site L1. The
event stopped once the de -pressuring was completed and closed bypass once common -line reached 0 PSI.
Thanks,
Dave
David Spall (Alternate — Jennifer Blake) 2 g lI
PCC/EOC Production Optimization Team Lead
907-659-4472 Office
219-689-4036 Cell
david.spall@bp.com
STATE OF ALASKA
ALASKA OIL AND GAS CONSERVATION COMMISSION
FACILITY REPORT OF PRODUCED GAS DISPOSITION
1. Facility Number
0290000009
2. Facility Name
PB LISBURNE PROD GPMA
3. Field
PBU - GPMA
4, Operator
BP
5. MonthNear of Disposition
July -2015
Disposition
Volume MCF
20. Forproduction from multiple pools, list contribution of each pool as a percent of Total
Volume.
6. Sold
29,409
Pool Name Pool Code Percent
7. Reinjected
7,301,253
Lisburne 640144 9.6%
Niakuk 640148 0.2%
8. Flared or vented 1 hour or less
278
North Prudhoe Bay State 640152 0.0%
Sadlerochit 640150 10.3%
9. Flared or vented more than 1 hour (see instr.)
0
Point McIntyre 640180 79.9%
Ivishak-Saq River test in GPMA 640147 0.1%
10. Pilot and Purge
11,531
West Beach 640186 0.0%
11, Assist Gas
168,956
12. Fuel gas used in lease operations.
529,693
13. Other (see instructions)
157,674
Official Use Only
Authorization >1 h[
Safety
MCF
14. TOTAL VOLUME (ITEMS 6-12)
8,196,794
Lease Use
MCF
15, NGL Gas Equivalent
29.409
Conservation
MCF
16. Purchased gas
0
Waste:
MCF
17. Transferred from:
1,133,914
Commissioner Date
18. Transferred to: (Express as a negative p)
0
19. Remarks: Block 13: Lift Gas Off Field; Block 17: MI from Prudhoe = 1,133,883 and Fuel Gas from Prudhoe = 31
1 hereby certify that!,foregoing is true and correct to the best of my knowledge.
�/y�,t �/����/,�� d Note: All volumes must be corrected
Signature GG t 1 Cy�'1J('�L�%I Title Mana er Production Taxes a d R alties Alaska to pressure of 14.65 psia and to a
% temperature of 60o F. Authority 20
Printed Name Diane ColleyPhone (907) 564-5775 Date / r / AAC25.235.
Form 10-422 Rev. 512009 INSTRUCTIONS ON REVERSE SIDE Submit in Duplicate
STATE OF ALASKA
ALASKA OIL AND GAS CONSERVATION COMMISSION
FACILITY REPORT OF PRODUCED GAS DISPOSITION
1. Facility Number
0290000009
2. Facility Name
PBU LISBURNE PROD GPMA
3. Field
PBU - GPMA
4. Operator 5. MonthNear of Disposition
BP August -2015
Disposition
Volume MCF
20. Forproduction from multiple pools, list contribution of each pool as a percent of Total
Volume,
6. Sold
U
Pool Name Pool Code Percent
7. Reinjected
7,099,999
Lisburne 640144 26.5%
Niakuk 640148 0.3%
8. Flared or vented 1 hour or less
391
North Prudhoe Bay State 640152 0.0%
Sadlerochit 640150 7.6%
9. Flared or vented more than 1 hour (see insV.)
0
Point McIntyre 640180 65.6%
Ivishak-SagRiver test in GPMA 640147 0.1%
10. Pilot and Purge
11,698
West Beach 640186 0.0%
11, Assist Gas
165,654
12. Fuel gas used in lease operations.
540,512
13. Other (see instructions)
132,902
Official Use Only
Authorization>1 he
Safety
MCF
14. TOTAL VOLUME (ITEMS 6.12)
7,951,156
Lease Use
MCF
15. NGL Gas Equivalent
0
Conservation
MCF
16. Purchased gas
0
Waste:
MCF
17. Transferred from:
950,069
Commissioner Date
18. Transferred to: (Express as a negative #)
0
19. Remarks: Block 13: Lift Gas Off Field; Block 17: MI from Prudhoe = 950,056 and Fuel Gas from Prudhoe = 13
1 hereby certify that the foregoing is true and correct to the best of my knowledge.
/ y1/f 4 Note: All volumes must be corrected
Signature 7 4, l.(.-��"//�V� Title Mana er Production Taxes and Ro alties Alaska to pressure of 14.65 psis and to a
temperature of 60o F. Authority 20
Printed Name Diane Colley Phone (907) 564-5775 Date kk AAC25.235.
Form 10-422 Rev. 5/2009 INSTRUCTIONS ON REVERSE SIDE Submit in Duplicate
BP EXPLORATION ALASKA, INC,
CONSERVATION ORDER NO. 219
PRUDHOE BAY, LISBURNE
LISBURNE PRODUCTION CENTER
GAS FLARING INCIDENTS
Aug -15
VOLUME PLANNED
DATE TIME (MSCF) DESCRIPTION OF INCIDENTS & CAUSE UNPLANNED ACTION TAKEN TO ELIMINATE CAUSE
8/4/2015 0823-0824 1
8/7/2015 1455-1505 9
8/21/2015 0148-0152 141
Total Flare <= 1 Hour 151
Total Flare > 1 Hour
Volume Flared 151
Measured Safety Pilot
3,144
Continuous Assist
44,162
TOTAL FLARED
47,457
Not required for unplanned events <= 1 hour
Not required for unplanned events <= 1 hour
Not required for unplanned events <= 1 hour
Planned Not required for unplanned events <= 1 hour
Planned Not required for unplanned events <= 1 hour
Planned Not required for unplanned events <= 1 hour
BP EXPLORATION ALASKA, INC,
CONSERVATION ORDER NO. 219
PRUDHOE BAY, POINT MCINTYRE
LISBURNE PRODUCTION CENTER
GAS FLARING INCIDENTS
Aug•15
VOLUME PLANNED
DATE TIME (MSCF) DESCRIPTION OF INCIDENTS & CAUSE UNPLANNED ACTION TAKEN TO ELIMINATE CAUSE
8/4/2015 0823-0824 6
8/7/2015 1455-1505 86
8/21/2015 0148-0152 106
Total Flare <= 1 Hour 198
Total Flare > 1 Hour 0
Volume Flared 198
Measured Safety Pilot
7,542
Continuous Assist
107,158
TOTAL FLARED
114,898
Not required for unplanned events <= 1 hour Planned Not required for unplanned events <= 1 hour
Not required for unplanned events <= 1 hour Planned Not required for unplanned events <=1 hour
Not required for unplanned events <= 1 hour Planned Not required for unplanned events <= 1 hour
BP EXPLORATION ALASKA, INC,
CONSERVATION ORDER NO. 219
PRUDHOE BAY, COMBINED NIAKUK
LISBURNE PRODUCTION CENTER
GAS FLARING INCIDENTS
Aug -15
VOLUME PLANNED
DATE TIME (Mscf) DESCRIPTION OF INCIDENTS & CAUSE UNPLANNED ACTION TAKEN TO ELIMINATE CAUSE
8/4/2015 0823-0824 0
8/7/2015 1455- 1505 0
8/21/2015 0148-0152 1
Total Flare <=1 Hour 1
Total Flare> 1 Hour 0
Volume Flared 1
Measured Safety Pilot
32
Continuous Assist
452
TOTALFLARED
485
Not required for unplanned events <= 1 hour Planned Not required for unplanned events <= 1 hour
Not required for unplanned events <= 1 hour Planned Not required for unplanned events <= 1 hour
Not required for unplanned events <= 1 hour Planned Not required for unplanned events <= 1 hour
BP EXPLORATION ALASKA, INC,
CONSERVATION ORDER NO. 219
PRUDHOE BAY, RAVEN
LISBURNE PRODUCTION CENTER
GAS FLARING INCIDENTS
Aug -15
VOLUME PLANNED
DATE TIME )Mscf) DESCRIPTION OF INCIDENTS & CAUSE UNPLANNED ACTION TAKEN TO ELIMINATE CAUSE
8/4/2015 0823-0824 0
8/7/2015 1455-1505 0
8/21/2015 0148-0152 0
Total Flare <=1 Hour 0
N
Total Flare > 1 Hour 0
Volume Flared 0
Measured Safety Pilot 7
Continuous Assist 93
TOTAL FLARED 100
Not required for unplanned events <- 1 hour Planned Not required for unplanned events <= 1 hour
Not required for unplanned events <= 1 hour Planned Not required for unplanned events <= 1 hour
Not required for unplanned events <- 1 hour Planned Not required for unplanned events <= 1 hour
BP EXPLORATION ALASKA, INC,
CONSERVATION ORDER NO. 219
PRUDHOE BAY, PRUDHOE
LISBURNE PRODUCTION CENTER
GAS FLARING INCIDENTS
Aug -15
VOLUME PLANNED
DATE TIME (Mscf) DESCRIPTION OF INCIDENTS & CAUSE UNPLANNED ACTION TAKEN TO ELIMINATE CAUSE
8/4/2015 0823-0824 1
8/7/2015 1455-1505 14
8/21/2015 0148-0152 26
Total Flare <=1 Hour 41
Total Flare> 3 Hour 0
Volume Flared 41
Measured Safety Pilot 973
Continuous Assist 13,789
TOTAL FLARED 14,803
Not required for unplanned events <= 1 hour Planned Not required for unplanned events <= 1 hour
Not required for unplanned events <= 1 hour Planned Not required for unplanned events <= 1 hour
Not required for unplanned events <= 1 hour Planned Not required for unplanned events <= 1 hour
BP EXPLORATION ALASKA, INC,
CONSERVATION ORDER NO. 219
PRUDHOE BAY, NORTH PRUDHOE BAY
LISBURNE PRODUCTION CENTER
GAS FLARING INCIDENTS
Aug -15
VOLUME PLANNED
DATE TIME (MSCF) DESCRIPTION OF INCIDENTS & CAUSE UNPLANNED ACTION TAKEN TO ELIMINATE CAUSE
Total Flare <=1 Hour 0
Total Flare > 1 Hour 0
Volume Flared
Measured Safety Pilot 0
Continuous Assist 0
TOTAL FLARED
BP EXPLORATION ALASKA, INC,
CONSERVATION ORDER NO. 219
PRUDHOE BAY, WEST BEACH
LISBURNE PRODUCTION CENTER
GAS FLARING INCIDENTS
Aug -15
VOLUME
PLANNED
DATE TIME (MSCF) DESCRIPTION OF INCIDENTS & CAUSE UNPLANNED ACTION TAKEN TO ELIMINATE CAUSE
Total Flare <=1 Hour
Total Flare > 1 Hour 0
Volume Flared
Measured Safety Pilot
Continuous Assist
TOTAL FLARED
STATE OF ALASKA
ALASKA OIL AND GAS CONSERVATION COMMISSION
FACILITY REPORT OF PRODUCED GAS DISPOSITION
1. Facility Number
0290000009
2. Facility Name
PBU LISBURNE PROD GPMA
3. Field
PBU - GPMA
4. Operator 5. MonMear of Disposition
BP I September -201 5
Disposition
Volume MCF
20. Forproduction from multiple pools, list contribution of each pool as a percent or Total
Volume.
6. Sold
19,800
Pool Name Pool Code Percent
7. Reinjected
8,264,156
Lisburne 640144 24.4%
Niakuk 640148 0.8%
B. Flared or vented 1 hour or less
358
North Prudhoe Bay State 640152 0.0%
Sadlerochit 640150 4.8%
9. Flared or vented more than 1 hour (see instr.)
O
Point McIntyre 640180 70.0%
Ivishak-SagRiver test in GPMA 640147 0.0%
10. Pilot and Purge
11,292
West Beach 640186 0.0%
11. Assist Gas
157,491
12. Fuel gas used in lease operations.
674,012
13. Other (see Instructions)
132,779
Official Use Only
Authorization >1 hr.
Safety
MCF
14. TOTAL VOLUME (ITEMS 6-12)
9,259,888
Lease Use
MCF
15. NGL Gas Equivalent
19,800
Conservation
MCF
16. Purchased gas
0
Waste:
MCF
17. Transferred from:
1,070,207
Commissioner Date
16. Transferred to: (Express as a negative #)
0
19. Remarks: Block 13: Lift Gas Off Field; Block 17: Ml from Prudhoe = 1,070,207 and Fuel Gas from Prudhoe = 0
1 hereby certify that the foregoing is true and correct to the best of my knowledge.
Nota: All volumes must be corrected
Signature 66CCY// OL Tine Manager Production Taxes and Ro alties Alaska to pressure of 14.65 psis and to a
temperature of 60o F. Authority 20
Printed Name Diane Colley Phone (907) 564-5775 Date AAC25.235.
Form 10-422 Rev. 5/2009 INSTRUCTIONS ON REVERSE SIDE Submit in Duplicate
BP EXPLORATION ALASKA, INC,
CONSERVATION ORDER NO. 219
PRUDHOE BAY, LISBURNE
LISBURNE PRODUCTION CENTER
GAS FLARING INCIDENTS
Sep -15
VOLUME PLANNED
DATE TIME (MSCF) DESCRIPTION OF INCIDENTS & CAUSE UNPLANNED ACTION TAKEN TO ELIMINATE CAUSE
9/6/2015 0105-0110 55
9/9/2015 1927-2005 15
Total Flare <=1 Hour 70
Total Flare > 1 Hour
Volume Flared
70
Measured Safety Pilot
2,773
Continuous Assist
38,678
TOTAL FLARED
41,521
1808 Reinjection Compressor shut -down for maintenance Planned Flare valve closed
Not required for unplanned events <=1 hour Unplanned Not required for unplanned events <=1 hour
BP EXPLORATION ALASKA, INC,
CONSERVATION ORDER NO. 219
PRUDHOE BAY, POINT MCINTYRE
LISBURNE PRODUCTION CENTER
GAS FLARING INCIDENTS
Sep -15
VOLUME PLANNED
DATE TIME (MSCF( DESCRIPTION OF INCIDENTS & CAUSE UNPLANNED ACTION TAKEN TO ELIMINATE CAUSE
9/6/2015 0105-0110 237
9/9/2015 1927-2005 51
Total flare <=1 Hour 288
Total Flare > 1 Hour 0
Volume Flared 288
Measured SafetV Pilot
7,889
Continuous Assist
110,048
TOTALFLARED
118,225
1808 Reinjection Compressor shut -down for maintenance Planned Flare valve closed
Not required for unplanned events <=1 hour Unplanned Not required for unplanned events <=1 hour
BP EXPLORATION ALASKA, INC,
CONSERVATION ORDER NO. 219
PRUDHOE BAY, COMBINED NIAKUK
LISBURNE PRODUCTION CENTER
GAS FLARING INCIDENTS
Sep -SS
VOLUME PLANNED
DATE TIME (Mscf( DESCRIPTION OF INCIDENTS & CAUSE UNPLANNED ACTION TAKEN TO ELIMINATE CAUSE
9/6/2015 0105-0110
9/9/2015 1927-2005
Total Flom r-1 Hour 0
Total Flom > 1 Hour
Volume Flared
Measured Safety Pilot 90
Continuous Assist 1,251
TOTAL FLARED 1,341
1808 Reinjection Compressor shut -down for maintenance Planned Flare valve closed
Not required for unplanned events <=1 hour Unplanned Not required for unplanned events <= 1 hour
RP EXPLORATION ALASKA, INC,
CONSERVATION ORDER NO. 219
PRUDHOE BAY, RAVEN
LISBURNE PRODUCTION CENTER
GAS FLARING INCIDENTS
Sep -15
VOLUME PLANNED
DATE TIME (Mscf) DESCRIPTION OF INCIDENTS & CAUSE UNPLANNED ACTION TAKEN TO ELIMINATE CAUSE
9/6/2015 0105-0110
9/9/2015 1927-2005
Total Flom <=1 Hour
Total Flare > 1 Hour
0
Volume Flared
0
Measured Safety Pilot
0
Continuous Assist
0
TOTAL FLARED 0
1809 Reinjection Compressor shut -down for maintenance Planned Flare valve closed
Not required for unplanned events <= 1 hour Unplanned Not required for unplanned events <= 1 hour
BP EXPLORATION ALASKA, INC,
CONSERVATION ORDER NO. 219
PRUDHOE BAY, PRUDHOE
LISBURNE PRODUCTION CENTER
GAS FLARING INCIDENTS
Sep -15
VOLUME PLANNED
DATE TIME (Mscf) DESCRIPTION OF INCIDENTS & CAUSE UNPLANNED ACTION TAKEN TO ELIMINATE CAUSE
9/6/2015 0105-0110
9/9/2015 1927-2005
Total Flom <=1 Hour 0
Total Flom > 1 Hour 0
Volume Flared 0
Measured Safety Pilot 540
Continuous Assist 7,514
TOTAL FLARED 8,054
1808 Reinjection Compressor shut -down for maintenance Planned Flare valve closed
Not required for unplanned events <= 1 hour Unplanned Not required for unplanned events <= 1 hour
BP EXPLORATION ALASKA, INC,
CONSERVATION ORDER NO. 219
PRUDHOE BAY, NORTH PRUDHOE BAY
LISBURNE PRODUCTION CENTER
GAS FLARING INCIDENTS
Sep -15
VOLUME PLANNED
DATE TIME (MSCF( DESCRIPTION OF INCIDENTS & CAUSE UNPLANNED ACTION TAKEN TO ELIMINATE CAUSE
Total Flare <=1 Hour
Total Flom> 1 Hour
Volume Flared
Measured Safety Pilot 0
Continuous Assist 0
TOTALFLARED 0
SP EXPLORATION ALASKA, INC,
CONSERVATION ORDER NO. 219
PRUDHOE BAY, WEST BEACH
LISBURNE PRODUCTION CENTER
GAS FLARING INCIDENTS
Sep -15
VOLUME PLANNED
DATE TIME (MSCF) DESCRIPTION OF INCIDENTS & CAUSE UNPLANNED ACTION TAKEN TO ELIMINATE CAUSE
Total Flare <-1 Hour 0
Total Flare > I Hour 0
Volume Flared 0
Measured Safety Pilot 0
Continuous Assist 0
TOTALFLARED 0
STATE OF ALASKA
ALASKA OIL AND GAS CONSERVATION COMMISSION
FACILITY REPORT OF PRODUCED GOS nispnciTilnti
1. Facility Number 2. Facility Name
0290000009 PBU LISBURNE PROD GPMA
Disposition
3, Field
PBU - GPMA
Volume MCF
4. Operator 5. Monthfyear of Disposition
BP October -2015
20. For production from multiple pools, list contribution of each pool as a percent of
Total Volume.
6. Sold
85,862
Pool Name Pool Code Percent
7. Reinjected
8,614,936
Lisburne 640144 33.6%
West Beach 640186 0.0%
8. Flared or vented 1 hour or less
334
✓
Sadlerochit 640150 4.8%
Niakuk 640148 0.9%
9. Flared or vented more than 1 hour (see instr.)
8,759/
Ivishak-Saq River test in 640147 0.1%
Point McIntyre 640180 60.7%
10. Pilotand Purge
111585
North Prudhoe Bay State 1 640152 0.0%
11. Assist Gas
165,841
12. Fuel gas used in lease operations.
731,103
13. Other (see instructions)
184,755-
Offloial Use Only
'
Authorization >1 hr:
Safety
MCF
14, TOTAL VOLUME (ITEMS 6-12)
9,803,175
Lease Use
MCF
15. NGL Gas Equivalent
85,862
Conservation
MCF
16. Purchased gas
0
Waste:
MCF
17. Transferred from:
1,057,606.
ay 1Z—/4 —/S
Commissioner Date
18. Transferred to: (Express as a negative #)
0
19. Remarks: Block 13: Lift Gas Off Field; Block 17: Ml from Prudhoe = 1,057,493 and Fuel Gas from Prudhoe = 113
I hereby cerlity that the foregoing is true and correct to the best of my knowledge.
���� Note: All volumes must be corrected
Signature -vim/ Title Manager Production Taxes and Royalties Alaska to pressure of 14.65 psia and to a
temperature of 60o F. Authority 20
Printed Name Diane ColleyPhone (907) 564-5775 Date AAC25.235.
V%L
tz115-1r5-
Form 10-422 Rev. 5/2009 INSTRUCTIONS ON REVERSE SIDE Submit in Duplicate
BP EXPLORATION ALASKA, INC,
CONSERVATION ORDER NO. 219
PRUDHOE BAY, LISBURNE
LISBURNE PRODUCTION CENTER
GAS FLARING INCIDENTS
OR -15
VOLUME
PLANNED
DATE TIME (Ml
DESCRIPTION OF INCIDENTS & CAUSE
UNPLANNED ACTION TAKEN TO ELIMINATE CAUSE
10/10/2015 1740-1744 131
1807 Reinjection compressor shutdown for Cassis Testing
Planned
1807 T/C depressurized and shut down
1807 Reinjection compressor shutdown because of
Started off-line T/C and stabilized facility
10/12/2015 1329-1339 0
control/instrumentation failure
Planned
process and operation
1855 Depropanizer Off Gas compressor shutdown because of
Flare valve closed after the switchgear was
10/15/2015 1403 -1412 8
an electrical power bump
Unplanned
reset and 1855 was started and loaded
Flare valve closed after 1855 lubricator;
1855 Depropanizer Off Gas compressor shutdown because of a
were pumped up and 1855 was restarted
10/15/2015 1502-1510 8
low pressure trip of its lubricator system
Unplanned
and loaded
Total Flare <=1 Hour 147
10/6/2015 2225-0022 2,279
10/17/2015 1143-1313 147
Total Flare > 1 Hour 2,426
Volume Flared 2,573
Measured Safely Pilot 4,014
Continuous Assist 57,339
TOTAL FLARED 63,926
1808 Reinjection compressor shutdown because of
control/Instrumentation failure associated with 38LO03-SH
1800 STV -IP compressor shutdown because of
control/instrmentation failure associated with IP suction
pressure switch
Reduced production rates and shut-in wells
Unplanned equaling 200 mscfd starting 20/623:10.
Flaring was premitted to continue while
operations personnel attempted to restart
Unplanned the equipment
BP EXPLORATION ALASKA, INC,
CONSERVATION ORDER NO. 219
PRUDHOE BAY, POINT MCINTYRE
LISBURNE PRODUCTION CENTER
GAS FLARING INCIDENTS
Ott -15
Total Flare <=1 Hour 155
1808 Reinjection compressor shutdown because of Reduced production rates and shut-in wells
10/6/2015 2225-0022 5,563 control/instrumentation failure associated with 38L003 -SH Unplanned equaling 200 mscfd starting 10/6 23:10.
1800 STV -IP compressor shutdown because of Flaring was premitted to continue while
control/instrmentation failure associated with IP suction operations personnel attempted to restart
10/17/2015 1143-1313 298 pressure switch Unplanned the equipment
Total Flare> 1 Hour 5,861
Volume Flared 6,016
Measured Safety Pilot 6,846
Continuous Assist 98,069
TOTAL FLARED 110,931
VOLUME
PLANNED
DATE
TIME (ll
DESCRIPTION OF INODENTS b CAUSE
UNPLANNED ACTION TAKEN TO ELIMINATE CAUSE
10/10/2015
1740-1744 126
1807 Reinjection compressor shutdown for Cassis Testing
Planned
1807 TIC depressurized and shut down
1807 Reinjection compressor shutdown because of
Started off-line T/C and stabilized facility
10/12/2015
1329-1339 1
control/instrumentation failure
Planned
process and operation
1855 Depropanizer Off Gas compressor shutdown because of
Flare valve closed after the switchgear was
10/15/2015
1403-1412 14
an electrical power bump
Unplanned
reset and 1855 was started and loaded
Flare valve closed after 1855 lubricators
1855 Depropanizer Off Gas compressor shutdown because of
were pumped up and 1855 was restarted
10/15/2015
1502-1510 14
a low pressure trip of its lubricator system
Unplanned
andloaded
Total Flare <=1 Hour 155
1808 Reinjection compressor shutdown because of Reduced production rates and shut-in wells
10/6/2015 2225-0022 5,563 control/instrumentation failure associated with 38L003 -SH Unplanned equaling 200 mscfd starting 10/6 23:10.
1800 STV -IP compressor shutdown because of Flaring was premitted to continue while
control/instrmentation failure associated with IP suction operations personnel attempted to restart
10/17/2015 1143-1313 298 pressure switch Unplanned the equipment
Total Flare> 1 Hour 5,861
Volume Flared 6,016
Measured Safety Pilot 6,846
Continuous Assist 98,069
TOTAL FLARED 110,931
BP EXPLORATION ALASKA, INC,
CONSERVATION ORDER NO. 219
PRUDHOE BAY, COMBINED NIAKUK
LISBURNE PRODUCTION CENTER
GAS FLARING INCIDENTS
Oct -15
Total Flare <=1 Hour 2
1808 Reinjection compressor shutdown because of
10/6/2015 2225-0022 43 control/instrumentation failure associated with 38L.003 -SH
1800 STV -IP compressor shutdown because of
control/instrmentation failure associated with IP suction
10/17/2015 1143-1313 4 pressure switch
Total Flare> 1 Hour 47
Volume Flared 49
Measured Safety Pilot 109
Continuous Assist 1,559
TOTAL FLARED 1,717
Reduced production rates and shut-in wells
Unplanned equaling 200 mscfd starting 10/623:10.
Flaring was premitted to continue while
operations personnel attempted to restart
Unplanned the equipment
VOLUME
PLANNED
DATE
TIME (Mscf)
DESCRIPTION OF INCIDENTS & CAUSE
UNPLANNED
ACTION TAKEN TO ELIMINATE CAUSE
10/10/2015
1740-1744 1
1807 Reinjection compressor shutdown for Cassis Testing
Planned
1807 T/C depressurized and shut down
1807 Reinjection compressor shutdown because of
Started off-line T/C and stabilized facility
10/12/2015
1329-1339 0
control/instrumentation failure
Planned
process and operation
1855 Depropanizer Off Gas compressor shutdown because of
Flare valve closed after the switchgear was
10/15/2015
1403-1412 1
an electrical power bump
Unplanned
reset and 1855 was started and loaded
Flare valve closed after 1855 lubricators
1855 Oepropanizer Off Gas compressor shutdown because of
were pumped up and 1855 was restarted
10/15/2015
1502 - 1510 0
a low pressure trip of its lubricator system
Unplanned
and loaded
Total Flare <=1 Hour 2
1808 Reinjection compressor shutdown because of
10/6/2015 2225-0022 43 control/instrumentation failure associated with 38L.003 -SH
1800 STV -IP compressor shutdown because of
control/instrmentation failure associated with IP suction
10/17/2015 1143-1313 4 pressure switch
Total Flare> 1 Hour 47
Volume Flared 49
Measured Safety Pilot 109
Continuous Assist 1,559
TOTAL FLARED 1,717
Reduced production rates and shut-in wells
Unplanned equaling 200 mscfd starting 10/623:10.
Flaring was premitted to continue while
operations personnel attempted to restart
Unplanned the equipment
BP EXPLORATION ALASKA, INC,
CONSERVATION ORDER NO. 219
PRUDHOE BAY, RAVEN
LISBURNE PRODUCTION CENTER
GAS FLARING INCIDENTS
Oct -is
Total Flare s= I Hour 0
1808 Reinjection compressor shutdown because of
10/6/2015 2225-0022 0 control/instrumentation failure associated with 38L003 -SH
1800 STVAP compressor shutdown because of
control/instrmentation failure associated with IP suction
10/17/2015 1143-1313 0 pressure switch
Total Flare> I Hour 0
Volume Flared 0
Measured Safety Pilot e
Continuous Assist 114
TOTAL FLARED 122
Reduced production rates and shut-in wells
Unplanned equaling 200 mscfd starting 30/6 23:10.
Flaring was premitted to continue while
operations personnel attempted to restart
Unplanned the equipment
VOLUME
PLANNED
DATE
TIME (Mscf(
DESCRIPTION OF INCIDENTS& CAUSE
UNPLANNED ACTON TAKEN TO ELIMINATE CAUSE
10/10/2015
1740-1744 0
1807 Reinjection compressor shutdown for Cassis Testing
Planned
1807 T/C depressurized and shut down
1807 Reinjection compressor shutdown because of
Started off-line T/C and stabilized facility
10/12/2015
1329-1339 0
control/instrumentation failure
Planned
process and operation
1855 Depropanizer Off Gas compressor shutdown because of
Flare valve closed after the switchgear was
10/15/2015
1403-1412 0
an electrical power bump
Unplanned
reset and 1855 was started and loaded
Flare valve closed after 1855 lubricators
1855 Depropanizer Off Gas compressor shutdown because of
were pumped up and 1855 was restarted
10/15/2015
1502 - 1510 0
a low pressure trip of its lubricator system
Unplanned
and loaded
Total Flare s= I Hour 0
1808 Reinjection compressor shutdown because of
10/6/2015 2225-0022 0 control/instrumentation failure associated with 38L003 -SH
1800 STVAP compressor shutdown because of
control/instrmentation failure associated with IP suction
10/17/2015 1143-1313 0 pressure switch
Total Flare> I Hour 0
Volume Flared 0
Measured Safety Pilot e
Continuous Assist 114
TOTAL FLARED 122
Reduced production rates and shut-in wells
Unplanned equaling 200 mscfd starting 30/6 23:10.
Flaring was premitted to continue while
operations personnel attempted to restart
Unplanned the equipment
BP EXPLORATION ALASKA, INC,
CONSERVATION ORDER NO. 219
PRUDHOE BAY, PRUDHOE
LISBURNE PRODUCTION CENTER
GAS FLARING INCIDENTS
Oct -15
Total Fare r-1 Hour 30
1808 Reinjection compressor shutdown because of
VOLUME
10/6/2015 2225-0022 403 control/instrumentation failure associated with 38LO03-SH Unplanned
PLANNED
1800 STV -IP compressor shutdown because of
DATE
TIME (Mscf(
DESCRIPTION OF INCIDENTS & CAUSE
UNMANNED
ACTION TAKEN TO ELIMINATE CAUSE
10/10/2015
1740-1744 27
1807 Reinjection compressor shutdown for Cassis Testing
Planned
1807 T/C depressurized and shut down
1807 Reinjection compressor shutdown because of
Started off-line T/C and stabilized facility
10/12/2015
1329-1339 0
control/Instrumentation failure
Planned
process and operation
1855 Depropanizer Off Gas compressor shutdown because of
Flare valve closed after the switchgear was
10/15/2015
1403-1412 2
an electrical power bump
Unplanned
reset and 1855 was started and loaded
Flare valve closed after 1855 lubricators
1855 Depropanizer Off Gas compressor shutdown because of a
were pumped up and 1855 was restarted
10/15/2015
1502-1510 1
low pressure trip of its lubricator system
Unplanned
andloaded
Total Fare r-1 Hour 30
1808 Reinjection compressor shutdown because of
Reduced production rates and shut-in wells
10/6/2015 2225-0022 403 control/instrumentation failure associated with 38LO03-SH Unplanned
equaling 200 mscfd starting 10/6 23:10.
1800 STV -IP compressor shutdown because of
Flaring was premitted to continue while
control/instrmentation failure associated with IP suction
operations personnel attempted to restart
10/17/2015 1143-1313 22 pressure switch Unplanned
the equipment
Total Flare > 1 Hour 425
Volume Flared 455
Measured Safety Pilot 608
Continuous Assist 8,760
TOTAL FLARED 9,823
BP EXPLORATION ALASKA, INC,
CONSERVATION ORDER NO. 219
PRUDHOE BAY, NORTH PRUDHOE BAY
LISBURNE PRODUCTION CENTER
GAS FLARING INCIDENTS
Oct -1S
VOLUME PLANNED
DATE TIME )MSCF) DESCRIPTION OF INCIDENTS & CAUSE UNPLANNED ACTION TAKEN TO ELIMINATE CAUSE
Total Flare c=1 Hour 0
Total Flare > 1 Hour
Volume Flared 0
Measured Safety Pilot
Continuous Assist
TOTAL FLARED 0
BP EXPLORATION ALASKA, INC,
CONSERVATION ORDER NO. 219
PRUDHOE BAY, WEST BEACH
LISBURNE PRODUCTION CENTER
GAS FLARING INCIDENTS
Oct -is
VOLUME PLANNED
DATE TIME (MSCF) DESCRIPTION OF INCIDENTS & CAUSE UNPLANNED ACTION TAKEN TO ELIMINATE CAUSE
Total Flare . I Hour
Total Flare> 1 Hour
Volume Flared
Measured Safety Pilot
Continuous Assist
TOTALFLARED a
11/20/2015
Flaring Event at LPC
Flaring Event at LPC
AK, OPS PCC EOC TL [AKOPSPCCEOCTL@bp.com]
Sent:Sunday, November 08, 2015 6:44 PM
To: AOGCC Reporting (DOA sponsored)
Cc: Loepp, Victoria T (DOA); Benson, Gary A [Gary.Benson@bp.com]; Arthur, Gregory [Gregory.Arthur@bp.com]; AK, OPS GC3&PCC
OSM [AKOPSGC3PCCOSM@BP.com]; Martin, Nelson D [Nelson.Martin@bp.com]; AK, HSSEE Env Adv East
[AKHSSEEEnvAdvEast@bp.com]; AK, OPS GPMA Facility OTL [AKOPSGPMAFacilityOTL@bp.com]; AK, OPS GPMA OSM
[AKOPSGPMAOSM@BP.com]; Glover, Robin (SLR) [Robin.Glover@bp.com]
To: AOGCC Reporting CC: Victoria Loepp, AOGCC
aogcc.reoorting(Walaska. iov
From: David Spall, GPB Production Optimization Team Leader
A flaring event occurred at LPC starting at 10/17/2015 11:43 and stopping at 10/17/2015 13:13 with a volume of 471
(MSCF). The event was a black smoke event. The event lasted for 90 minutes and was due to 1800 STV -IP
compressor shutdown because of control/instrumentation failure associated with the IP suction pressure switch.
The flaring stopped once the compressor was restarted.
Thanks,
David Spall (Alternate—Jennifer Blake)
PCC/EOC Production Optimization Team Lead
907-659-4472 Office
219-689-4036 Cell
david.soall ffift.com
https://webmaile.alaska.gmfowat?ae= Item&t=IPM.Note&irk RgAAAABKLne2zgP4SoMkep0hCxbSBwBUvQ964rjQTgYgn3632GdIAAAAhhLyAABUvQ964rjQT... 1/1
11/25/2015 RE: Flaring Event at LPC- Enterprise Vault Archived Item
From AK, OPS PCC EOC TL Date 10/19/2015, 12:23:00 PM
To AOGCC Reporting (DOA sponsored)
Cc Loepp, Victoria T (DOA); Benson, Gary A; Arthur, Gregory; AK, OPS GC3&PCC OSM; Martin, Nelson D;
AK, HSSEE Env Adv East; AK, OPS GPMA Facility OTL; AK, OPS GPMA OSM; Glover, Robin (SLR)
Subject RE: Flaring Event at LPC
To: AOGCC Reporting CC: Victoria Loepp, AOGCC
aoacc reoortingea alaska.aov
From: Jennifer Blake, GPB Production Optimization Team Leader
Correction to the 10/6/15 LPC Flaring Report:
A flaring event occurred at LPC starting at 10/06/2015 22:25 and continued on into 10/7/2015. The event was
not a black smoke event and was due to 1808 reinjection compressor shutdown from a
control./instrumentation failure associated with a high level switch. The flaring stopped once production rates
were reduced sufficiently. Volumes and timeframe for each day are as follows:
• 10/06/2015 22:25 to 23:59 had a volume of 7953 (MSCF). The event lasted for 95 minutes The event
had a volume greater than 5000 (MSCF)
• 10/07/2015 00:00 to 00:22 had a volume of 335 (MSCF). The event lasted for 22 minutes.
Thanks,
Jennifer Blake
PCC/EOC Production Optimization Team Lead (alt David Spall)
Office (907) 659-4472
Cell (907) 830-6204
Jennifer.blake@bp.com
From: AK, OPS PCC EOC TL
Sent: Friday, October 16, 2015 2:45 PM
To: 'aogcc.reporting@alaska.gov'
Cc: 'Loepp, Victoria T (DOA) (victoria.loepp@alaska.gov)'; Benson, Gary A; Arthur, Gregory; AK, OPS
GC3&PCC OSM; Martin, Nelson D; AK, HSSEE Env Adv East; AK, OPS GPMA Facility OTL; AK, OPS GPMA OSM;
Glover, Robin (SLR)
Subject: Flaring Event at LPC
To: AOGCC Reporting CC: Victoria Loepp, AOGCC
aoacc reoorting@alaska gov
From: Jennifer Blake, GPB Production Optimization Team Leader
A flaring event occurred at LPC starting at 10/06/2015 22:25 and stopping at 10/06/2015 23:59 with a volume
of 7935 (MSCF). The event was a black smoke event. The event lasted for 94 minutes. The event had a
volume greater than 5000 (MSCF) and was due to 1808 reinjection compressor shutdown from a
rnntrnl /i net. imenfntinn foihire eenriof,rl n,ifh n Minh level muifrh The florin efnnnerl nnre nrnrliirtinn rofee
hfps://ancevO2.sw.alaska.gov/EnterpriseVaul VV!mMessage.asp?Vaultld=1870ADEC3E0501 E4AB013887467C F6E0BA1110000Jnuev02&Savesetld=20151120... 1/1
11/25/2015 Flaring Event at LPC- Enterprise Vault Archived Item
From AK, OPS PCC EOC TL Date 10/16/2015, 2:45:34 PM
To AOGCC Reporting (DOA sponsored)
Cc Loepp, Victoria T (DOA); Benson, Gary A; Arthur, Gregory; AK, OPS GC3&PCC OSM; Martin, Nelson D;
AK, HSSEE Env Adv East; AK, OPS GPMA Facility OTL; AK, OPS GPMA OSM; Glover, Robin (SLR)
Subject Flaring Event at LPC
To: AOGCC Reporting CC: Victoria Loepp, AOGCC
aogcc.reporting@alaska.gov
From: Jennifer Blake, GPB Production Optimization Team Leader
A flaring event occurred at LPC starting at 10/06/2015 22:25 and stopping at 10/06/2015 23:59 with a volume of
7935 (MSCF). The event was a black smoke event. The event lasted for 94 minutes. The event had a volume
greater than 5000 (MSCF) and was due to 1808 reinjection compressor shutdown from a control./instrumentation
failure associated with a high level switch. The flaring stopped once production rates were reduced sufficiently.
Thanks
Jennifer Blake
PCC/EOC Production Optimization Team Lead (alt David Spall)
Office (907) 659-4472
Cell (907) 830-6204
Jennifer.blake@bp.com
httpsJ/ancevO2.soa.alaska.gw/EnterpriseVaulVVimMessage.aspWaultld=1870ADEC3E0501 E4A30D8874B7CF6E0BA1110000jnuev02&Savesetld=20151118... 111
STATE OF ALASKA
ALASKA OIL AND GAS CONSERVATION COMMISSION
FACILITY REPORT OF PRODUCED GAS DISPOSITInN
1. Facility Number
0290000009
2. Facility Name
PBU LISBURNE PROD GPMA
3. Field
PBU - GPMA
4. Operator
BP
5. MonthNear of Disposition
November -2015
Disposition
Volume MCF
20. For production from multiple pools, list contribution of each pool as a percent of
Total Volume.
6. Sold
96,904
Pool Name Pool Code Percent
7. Reinjected
11,236,633
Lisburne 640144 35.0%
West Beach 640186 0.0%
8. Flared or vented 1 hour or less
75
Sadlerochit 640150 5.9%
Niakuk 640148 0.5%
9. Flared or vented more than 1 hour (see instr.)
0
IVlshak-SagRiver test in 640147 1.3%
North Prudhoe Bay State 640152 0.0%
10. Pilot and Purge
11,532
Point McIntyre 640180 57.3%
11. Assist Gas
118,582
12. Fuel gas used in lease operations.
858,798
13. Omer (see instructions)
145,736
Official Use Only
Authorization >i hr:
Safety
MCF
14. TOTAL VOLUME (ITEMS 6.12)
12,468,260
Lease Use
MCF
15. NGL Gas Equivalent
96,904
Conservation
MCF
16. Purchased gas
Waste:
MCF
17. Transferred from:
1,474,405
Commissioner Date
18. Transferred to: (Express as a negative #)
0
19. Remarks: Block 13: Lift Gas Off Field; Block 17: MI from Prudhoe = 1,472,566 and Fuel Gas from Prudhoe = 1,839
1 hereby certify that theforegoing is true and correct to the best of my knowledge.
Note: All volumes must be corrected
Signature C.fLUt x+ Title Mana er Production Taxes and Ro allies Alaska t0 pressure of 14.65 psia and to a
XW
Printed Name Diane Colleytemperature of 60o F. Authority 20 Phone (907) 564-5775 Date % AAC25.235.
Form 10422 Rev. 5/2009 INSTRUCTIONS ON REVERSE SIDE Submit in Duplicate
BP EXPLORATION ALASKA, INC,
CONSERVATION ORDER NO. 219
PRUDHOE BAY, LISBURNE
LISBURNE PRODUCTION CENTER
GAS FLARING INCIDENTS
Nov -IS
VOLUME PLANNED
DATE TIME (MSCF) DESCRIPTION OF INCIDENTS & CAUSE UNPLANNED ACTION TAKEN TO ELIMINATE CAUSE
11/5/2015 1437-1451 15
Total Flare .I Hour 1s
Total Flare > 1 Hour 0
Volume Flared
15
Measured Safety Pilot
3,977
Continuous Assist
39,066
TOTAL FLARED
43,058
Completed troubleshooting, reloaded 1800
T/C, and stabilized facility process and
1800 T/C shutdown because of low IP suction pressure Unplanned operation.
BP EXPLORATION ALASKA, INC,
CONSERVATION ORDER NO. 219
PRUDHOE BAY, POINT MCINTYRE
LISBURNE PRODUCTION CENTER
GAS FLARING INCIDENTS
Nov -15
VOLUME PLANNED
DATE TIME (MSCF) DESCRIPTION OF INCIDENTS & CAUSE UNPLANNED ACTION TAKEN TO ELIMINATE CAUSE
11/5/2015 1437-1451 57
Total Flare .I Hour 57
Total Flare > I Hour
0
Volume Flared
57
Measured Safety Pilot
6,663
Continuous Assist
72,136
TOTAL FLARED
78,856
Completed troubleshooting, reloaded 1800
T/C, and stabilized facility process and
1800 T/C shutdown because of low IP suction pressure Unplanned operation.
BP EXPLORATION ALASKA, INC,
CONSERVATION ORDER NO. 219
PRUDHOE BAY, COMBINED NIAKUK
LISBURNE PRODUCTION CENTER
GAS FLARING INCIDENTS
Nov -15
VOLUME PLANNED
DATE TIME IMSeF) DESCRIPTION OF INCIDENTS & CAUSE UNPLANNED ACTION TAKEN TO ELIMINATE CAUSE
Total Flare m 1 Hour 0
Total Flare> I Hour
Volume Flared
Measured Safety Pilot 57
Continuous Assist 455
TOTALFLARED 512
BP EXPLORATION ALASKA, INC,
CONSERVATION ORDER NO. 219
PRUDHOE BAY, RAVEN
LISBURNE PRODUCTION CENTER
GAS FLARING INCIDENTS
Nov -15
VOLUME PLANNED
DATE TIME (Mscf) DESCRIPTION OF INCIDENTS & CAUSE UNPLANNED ACTION TAKEN TO ELIMINATE CAUSE
Total Flare <=1 Hour 0
Total Flare> 1 Hour
Volume Flared
Measured Safety Pilot 145
Continuous Assist 1,118
TOTALFLARED 1,263
BP EXPLORATION ALASKA, INC,
CONSERVATION ORDER NO. 219
PRUDHOE BAY, PRUDHOE
BURNIE PRODUCTION CENTER
GAS FLARING INCIDENTS
Nov -15
VOLUME
PLANNED
DATE TIME JIVIl DESCRIPTION OF INCIDENTS & CAUSE UNPLANNED ACTION TAKEN TO ELIMINATE CAUSE
11/5/2015 1437-1451
Total Flare <=1 Hour 3
Total Flare> 1 Hour 0
Volume Flared 3
Measured Safety Pilot 690
Continuous Assist 5,807
TOTAL FLARED 6,500
Completed troubleshooting, reloaded 1800
T/C, and stabilized facility process and
1800 T/C shutdown because of low IP suction pressure Unplanned operation.
BP EXPLORATION ALASKA, INC,
CONSERVATION ORDER NO. 219
PRUDHOE BAY, NORTH PRUDHOE BAY
LISBURNE PRODUCTION CENTER
GAS FLARING INCIDENTS
Nov -15
VOLUME PLANNED
DATE TIME (MSCF) DESCRIPTION OF INCIDENTS & CAUSE UNPLANNED ACTION TAKEN TO ELIMINATE CAUSE
Total Flare <-1 Hour 0
Total Flare> 1 Hour
Volume Flared
Measured Safety Pilot 0
Continuous Assist 0
TOTALFLARED 0
BP EXPLORATION ALASKA, INC,
CONSERVATION ORDER NO. 219
PRUDHOE BAY, WEST BEACH
LISBURNE PRODUCTION CENTER
GAS FLARING INCIDENTS
Nov -15
VOLUME PLANNED
DATE TIME (MSCF( DESCRIPTION OF INCIDENTS 9, CAUSE UNPLANNED ACTION TAKEN TO ELIMINATE CAUSE
Total Flare <=1 Hour 0
Total Flare> 1 Hour
Volume Flared
Measured Safety Pilot 0
Continuous Assist 0
TOTALFLARED 0
STATE OF ALASKA
ALASKA OIL AND GAS CONSERVATION COMMISSION
FACILITY REPORT OF PRODUCED GAS DISPOSITION
1. Facility Number 2. Facility Name
0290000009 PBU LISBURNE PROD GPMA
Disposition
3. Field
PBU - GPMA
volume MCF
4. Operator 5. Month/Year of Disposition
BP December -2015
20. For production from multiple pools, list contribution of each pool as a percent of
Total volume.
6. Sold
108,513
Pool Name Pool Code Percent
7. Reinjected
11,656,006
Lisburne 640144 45.7%
West Beach 640186 0.0%
8. Flared or vented 1 hour or less
0
Sadlerochit 640150 9.8%
Niakuk 640148 0.9%
9. Flared or vented more than 1 hour (see instr.)
0
Ivishak-Sag River test in 640147 2.2%
Point McIntyre 640180 41.4%
10. Pilot and Purge
11 746
North Prudhoe Ba State 640152 0.0%
11. Assist Gas
71,454
12. Fuel gas used in lease operations.
881,084
13. Other (see instructions)
178,360
Of rouse only
Authorization hr:
Safety
MCF
14. TOTAL VOLUME (ITEMS 6-12)
12,907,163
Lease Use
MCF
15. NGL Gas Equivalent
108,513
Conservation
MCF
16. Purchased gas
0
Waste:
MCF
17. Transferred from:
1,988,301
Commissioner Date
18. Transferred to: (Express as a negative #)
0
19. Remarks: Block 13: Lift Gas Off Field; Block 17: MI from Prudhoe = 1,988,301 and Fuel Gas from Prudhoe = 0
hereby certify That t foregoing is tru and correct the best of my knowledge.
11
ne Note: All volumes must be corrected
Signature Title Manager Production Taxes a d Ro allies Alaska to pressure of 14.65 psia and to a
Printed Name Diane Colley I jO temperature of 60o F. Authority 20
( )
Phone 907 564-5775 Date ( AAC25.235.
Form 10-422 Rev. 5/2009 INSTRUCTIONS ON REVERSE SIDE Submit in Duplicate
BP EXPLORATION ALASKA, INC,
CONSERVATION ORDER NO. 219
PRUDHOE BAY, COMBINED NIAKUK
LISBURNE PRODUCTION CENTER
GAS FLARING INCIDENTS
Dec -15
VOLUME PLANNED
DATE TIME (Mscf) DESCRIPTION OF INCIDENTS Be CAUSE UNPLANNED ACTION TAKEN TO ELIMINATE CAUSE
Total Flare <=1 Hour 0
Total Flare > 1 Hour
Volume Flared 0
Measured Safety Pilot 109
Continuous Assist 661
TOTALFLARED 770
SP EXPLORATION ALASKA, INC,
CONSERVATION ORDER NO. 219
PRUDHOE BAY, RAVEN
LISBURNE PRODUCTION CENTER
GAS FLARING INCIDENTS
Dec -15
VOLUME PLANNED
DATE TIME (Ni DESCRIPTION OF INCIDENTS & CAUSE UNPLANNED ACTION TAKEN TO ELIMINATE CAUSE
Total Flare <= 1 Hour
Total Flare > 1 Hour
Volume Flared
Measured Safety Pilot 264
Continuous Assist 1,605
TOTALFLARED 1,869
BP EXPLORATION ALASKA, INC,
CONSERVATION ORDER NO. 219
PRUDHOE BAY, PRUDHOE
LISBURNE PRODUCTION CENTER
GAS FLARING INCIDENTS
Dec -15
VOLUME PLANNED
DATE TIME (Mscf) DESCRIPTION OF INCIDENTS & CAUSE UNPLANNED ACTION TAKEN TO ELIMINATE CAUSE
Total Flare <= 1 Hour 0
Total Flare n 1 Hour
Volume Flared 0
Measured Safety Pilot 1,158
Continuous Assist 6,965
TOTAL FLARED 8,123
RP EXPLORATION ALASKA, INC,
CONSERVATION ORDER NO. 219
PRUDHOE BAY, NORTH PRUDHOE BAY
LISBURNE PRODUCTION CENTER
GAS FLARING INCIDENTS
Dec -15
VOLUME PLANNED
DATE TIME (MSCF( DESCRIPTION OF INCIDENTS a CAUSE UNPLANNED ACTION TAKEN TO ELIMINATE CAUSE
Total Fiore <= I Hour a
Total Flare> 1 Hour
Volume Flared
Measured Safety Pilot
Continuous Assist
TOTALFLARED
BP EXPLORATION ALASKA, INC,
CONSERVATION ORDER NO. 219
PRUDHOE BAY, WEST BEACH
LISBURNE PRODUCTION CENTER
GAS FLARING INCIDENTS
Deo -15
VOLUME PLANNED
DATE TIME (MSCF) DESCRIPTION OF INCIDENTS & CAUSE UNPLANNED ACTION TAKEN TO ELIMINATE CAUSE
Total Flare . I Hour 0
Total Flare> 1 Hour
Volume Flared 0
Measured Safety Pilot 0
Continuous Assist 0
TOTALFLARED 0
RP EXPLORATION ALASKA, INC,
CONSERVATION ORDER NO. 219
PRUDHOE BAY, POINT MCINTYRE
LISBURNE PRODUCTION CENTER
GAS FLARING INCIDENTS
Dec -15
VOLUME PLANNED
DATE TIME (MSCF) DESCRIPTION OF INCIDENTS 8 CAUSE UNPLANNED ACTION TAKEN TO ELIMINATE CAUSE
Total Flare.1 Hour 0
Total Flare> 1 Hour
Volume Flared
Measured Safety Pilot 4,006
Continuous Assist 29,643
TOTAL FLARED 34,449
BP EXPLORATION ALASKA, INC,
CONSERVATION ORDER NO. 219
PRUDHOE BAY, LISBURNE
IURNE PRODUCTION CENTER
GAS FLARING INCIDENTS
Dec -15
VOLUME PLANNED
DATE TIME (MSCF) DESCRIPTION OF INCIDENTS &CAUSE UNPLANNED ACTION TAKEN TO ELIMINATE CAUSE
Total Flare <= 3 Hour
Total Flare> 1 Hour
Volume Flared
Measured Safety Pilot 5,409
Continuous Assist 32,580
TOTAL FLARED 37,989