Department of Commerce, Community, and Economic Development
Alaska Oil and Gas Conservation Commission
Loading...
HomeMy WebLinkAboutKuparuk River Unit CPF 3 - ConocoPhillips Alaska, Inc.State of Alaska AOGCC
Gas Disposition Files
Year: 2016
Facility: Kuparuk River Unit CPF 3
Operator: ConocoPhillips Alaska, Inc.
STATE OF ALASKA
ALASKA OIL AND GAS CONSERVATION COMMISSION
ACILITY REPORT OF PRODUCED GAS DISPOSITIOI
1. Facility Number. .r
0290000023
2. Facility Name1, 3. Field
CENTRAL PROCESSING FACILITY #3 KUPARUK RIVER UNIT
4. Operator 5. MchthlYear of.Disposrtioq
CONOCOPHILLIPS ALASKA, INC. 1!311201611:59:59 PM
Dis position Volume MCF
20.
For roduction from multi pools, list contnbudon of each pool as a percent of Total Volume
6. Sold 5,425
Pool Name Pool Code Percent
7. Reinjected 0
KUPARUKRrVERUNIT 460100 100.000%
8. Flared or vented i hour or less 812
9. Flared or vented more than 1 hour (see instr.) 0
10. Pilot and Purge 17,818
11. Assist Gas 0
100.000
12. Fuel gas used in lease operations 723,298
13. Other(Seeinstructions)
AWwriration>1hr Safety MCF
14. TOTAL VOLUMES (ITEMS 6-13) 747,353
15. NGL Gas Equivalent 0
Lease Use MCF
16. Purchased gas 0
Conservation MCF
17. Transferred from: 477,237
Waste: MCF
18. Transferred to: (Express as a negative 1(413,530)
Commissioner Date
19. Remarks: Reinjected vol does not include volumes of Oooguruk Gas production reflected on line 17. Line 6 is Oooguruk sales 0 Nikaitchuq sales 4,879, and Air
Force Power generation sale 546. Line 18 is 000guruk returned gas.
I hereby certify that the fo ,going is true W correct to the best of my knowledge
Signature/f(/ �/ /� TNa Analyst
Primed Name Diane Hendrickson
Production 8 Revenue Accounting NOTE: AJI volumes must be corrected to pressure of 14.65 p "
and to a temperature of 60 degrees F.
I Authodty 20 AAC25235
CONFIDENTIAL pursuant to: AS 43.05.230, AS 40.25.100, AS 38.05.035 (a)(8), and AS 38.05.036 (1).
1/31/2016
CONSERVATION ORDER NO. 219
GAS FLARING OR VENTING INCIDENTS
CPF #3
January -2016
PLANNED
VOLUME ACTION TAKEN TO MINIMIZE
DATE TIME MSCF DESCRIPTION OF FLARING EVENT UNPLANNED VOLUME
FLARING OR VENTING EVENTS GREATER THAN 1 HOUR
0
TOTAL OVER 1 HOUR 0
Planned > 1 Hour 0
PLANNED EVENTS LESS THAN 1 HOUR
Flare or Vent Volumes:
Greater than 1 hour
0
Less than 1 hour
812
Continuous Assist
0
Pilot and Purge
17,818
TOTAL FLAREDIVENTED 18,630
CONFIDENTIAL pursuant to: AS 43.05.230, AS 40.25.100, AS 38.05.035 (a)(8), and AS 38.05.036 (f).
STATE OF ALASKA
ALASKA OIL AND GAS CONSERVATION COMMISSION
ACILITY REPORT OF PRODUCED GAS DISPOSITIOI
1. Facility Number
0290000023
2. FacOity Name 3. Field
CENTRAL PROCESSING FACILITY ff3 KUPARUK RIVER UNIT
4.Operator 5. MontWearof Disposition
CONOCOPHILLIPS ALASKA INC. 21291201611:59:59 PM
Disposition Volume MCF
20.
For production from multiple pools, list contribution of each pool as a percent of Total Votume
6. Sold 3,458
Pool Name Pool Code Percent
7. Reinjected 0
KUPARUK RIVER UNIT 490100 100.000%
8. Flared or vented 1 hour or less 686
9. Flared or vented more than 1 hour (see instr.) 0
10. Pilotand Purge 16,909
11. Assist Gas _ 0
100.000%
12. Fuel gas used In lease operations 675,103
13. Omer (see instructions)"s''wpOftle�zli)§e�A�l:i�i11._
;...:y.�s,
14. TOTAL VOLUMES (ITEMS 6.13) 696.056
Aumorization>1 hr Safety I IMCF
15. NGL Gas Equivalent 0
lease Use!CF
16. Purchased gas 0
1conservallorl MCF
17. Transferred from: 442,899
Waste: IMCF
18. Transferred to: (Express, as a negative iS (387,516)
Commissioner Date
19. Remarks: Reinjected vol does not include volumes of Oooguruk Gas production reflected on line 17. Line 6 is Oooguruk sales 302 Nikaitchuq sales 2,523, and
Air Force Power generation sale 633. Line 18 is Oooguruk returned gas.
I hereby certify that the foregoing is true and cvneot to the best of my knowledge
Signature _ Title Analyst, Production 8 Revenue AccountingNOTE: All volumes must be corrected to pressure of 14.65 Asia
r and to a temperature of 60 degrees F.
Printed Name Jon Fumes Authority 20 AAC25 235
2129/2016
CONSERVATION ORDER NO. 219
GAS FLARING OR VENTING INCIDENTS
CPF #3
February -2016
PLANNED
VOLUME ACTION TAKEN TO MINIMIZE
DATE TIME MSCF DESCRIPTION OF FLARING EVENT UNPLANNED VOLUME
FLARING OR VENTING EVENTS GREATER THAN 1 HOUR
0
TOTAL OVER 1 HOUR
Planned>1 Hour
PLANNED EVENTS LESS THAN 1 HOUR
Flare or Vent Volumes:
Greater than 1 hour
0
Less than 1 hour
586
Continuous Assist
0
Pilot and Purge
16,909
TOTAL FLAREDNENTED 17,495
STATE OF ALASKA
ALASKA OIL AND GAS CONSERVATION COMMISSION
ACILITY REPORT OF PRODUCED GAS DISPOSITIOI
1. Fadltty Number2.
0290000023
Facility Name 3. Field
CENTRAL PROCESSING FACILITY 03 KUPARUK RIVER UNTT
4. Operator
CONOCOPHILLIPS ALASKA, INC.
5. MonlNYear of Disposition
3/31!201611:59:59 PM
Disposition Volume MCF
20.
Forprdducdan from multiple pools, list conlr budon of each pool as a percent of Total Volume
6. Sold 13,293
Pool Name Pool Code Percent
7. Reinjected 0
KUPARUK RIVER UNIT 490100 100.000 %
S. Flared or vented 1 hour or less 846
9. Flared or vented more than 1 hour (see inst.) 0
10. Pilot and Purge 17,348
11. Assist Gas 0
100.000%
12. Fuel gas used in lease operators 638,021
13. Other (see instruction)
;x a,,=r�, '11 1'x, ,�nv;UlBclal tlse,lkllx :;i
14. TOTAL VOLUMES (ITEMS 6-13) 669,508
Autho a' n>1 hr Safety MCF
15. NGL Gas Equivalent 0
Lease Use MCF
16. Purchased gas 0
Conservation MCF
17. Transferred from: 553,577
Waste: MCF
18. Transferred W. (Express as a negative #) (401,985)
Commssioner Date
19. Remarks: Reinjected vol does not include volumes of Oooguruk Gas production reflected on line 17. Line 6 is Oooguruk sales 0 Nikaitchuq sales 12,510, and
Air Force Power generation sale 783. Line 18 is Oooguruk returned gas.
I hereby certify that the foregoing is true and correct to the best of my knowledge
Signature Tile Analyst Proouc*on 8 Revenue Account NOTE: All volumes must be Whaeted to pressure of 14.85 psi
and to a temperature of 60 degrees F.
Printed Name Jon Fumes Authority 20 AAC25 235
VOLUME
DATE TIME MSCF
313112016
CONSERVATION ORDER NO. 219
GAS FLARING OR VENTING INCIDENTS
CPF #3
March -2016
PLANNED
DESCRIPTION OF FLARING EVENT UNPLANNED
FLARING OR VENTING EVENTS GREATER THAN 1 HOUR
0
TOTAL OVER 1 HOUR
Planned > 1 Hour
PLANNED EVENTS LESS THAN 1 HOUR
Flare or Vent Volumes
Greater than 1 hour
0
Less than 1 hour
846
Continuous Assist
0
Pilot and Purge
17,348
TOTAL FLAREDNENTED 18,194
ACTION TAKEN TO MINIMIZE
STATE OF ALASKA
ALASKA OIL AND GAS CONSERVATION COMMISSION
FACILITY REPORT OF PRODUCED GAS DISPOSITION
7. Facility Number
0290000023
2. Faa7ny Name 3. Field
CENTRAL PROCESSING FACILITY #3 KUPARUK RIVER UNIT
Operator
LNOCOPHILLIPSALASKA, INC.
5. Month/Year of Disposition
4130/201611:59:59 PM
Disposition Volume MCF
20 Forproduction from muNple pools, list conmailf1w of each pool as a percent of Total Volume
6. Sold 7,007
Pool Name Pool Code Percent
7. Reinjected 0
KUPARUK RIVER UNIT 490100 100.000%
B. Flared orvented l hour or less 1,226
9. Flared or vented more than 1 hour (see insb.) 60
10. Pilot and Purge 15,076
11. Assist Gas p
1130.000%
12. Fuel gas used in lease operations 363,837
13. Other (see ineVllCaeria)
Authorkation>11hr Safety MCF
14. TOTAL VOLUMES (ITEMS 6-13) 367,209
15, NGL Gas Equivalent 0
VesseUse MCF
16. Purchased gas 0
11Conselvatlon MCF
17, Transferred from: 529,439
Waste: MCF
4-2--14
18. Transferred to: (E(press as a negative #). (179,400)
Commissioner Date
19. Remarks: Reinjected vol does not include volumes of Oooguruk Gas production reflected online 17. Line 6 Is Oooguruk sales 0 Nikaitchuq sales 6,350, and Air Force
Power generation sate 657. Line 18 is Oooguruk returned gas.
I hereby certify that the foregoft is true and cor to the best of my knoMedge
Signature Title A tayst Production 8 Revenue Accounting OTE: All volumes must be comected to Pressure of 14.65 psi
and to a temperature of 60 degrees F.
Printed Name Jon Fumes Aulhoft 20 AAC25235
V -1 -L-
iu, it/ 14
-rtfo6D/16
413012016
CONSERVATION ORDER NO. 219
GAS FLARING OR VENTING INCIDENTS
CPF #3
AP01-2016
PLANNED
VOLUME ACTION TAKEN TO MINIMIZE
DATE TIME MSCF DESCRIPTION OF FLARING EVENT UNPLANNED VOLUME
FLARING OR VENTING EVENTS GREATER THAN 1 HOUR
Facility Maintenance. Attempted to bleed
11:37:00 AM - down first stage aHercooler bay E/F to repair
4/4/2016 12:40:00 PM 60 tube leak.
TOTAL OVER 1 HOUR 60
Planned > 1 Hour 60
PLANNED EVENTS LESS THAN 1 HOUR
Flare or Vent Volumes
Greater than 1 hour
60
Less than 1 hour
1,229
Continuous Assist
0
Pilot and Purge
15,076
TOTAL FLAREDNENTED 16,365
Facility maintenance completed.
STATE OF ALASKA
ALASKA OIL AND GAS CONSERVATION COMMISSION
FACILITY REPORT OF PRODUCED GAS DISPOSITION
1. Facility Number
0290000023
2.1 Ziliy, Name 3. Mold
CENTRAL PROCESSING FACILITY A3 KUPARUK RIVER UNIT
4. Operator
CONOCOPNILLIPSALASKA, INC.
5. MonfNyear of Disposition
51311201611:56:69 PM
Disposition Volume MCF
20. For production from mul0pra pools, Ifid conWbuffW of 956h poo( as a percent or 7ofaf Volume
6. Sold 5,117
Pool Name Pool Code Percent
7. Reir4ected _ 0
KUPARUK RIVER UNIT 490100 100.000%
6. Flared or veined 1 hour or less 1 947
9. Flared or vented more than 1 hour (see ins0.) 11
10. Pilot and Purge 16,656
11. Assist Gas g
100000%
12. Fuel gas used in lease operations 492,649
13. Other (see instructions)
5w v;i+rru 1?,;. rxcsre
14. TOTAL VOLUMES (ITEMS 6.13) 516,452
Authoftatfol Safety MCF
15. NGL Gas Equivalent 0
Lease Use MCF
16. Purchased gas 0
Conservation MCF
17. Transferred from: 523,027
Waste: TCF
ALO
.t,7 ..- % �% —� Y
18. Transferred to: (EViress as a negative fy/
(311,959)
Commissioner Dale
19. Remarks: Reinjected Vol does not include volumes Of 000guruk Gas production reflected on line 17. Line 6 is Oooguluk sales 1,535 Nikaitchuq sales 3,079, and Air
Force Power generation sale 503. Line 18 is 0ooguruk returned gas.
(hereby certify that the foregoing is `e aridArect to the best of my knoaledge
Signature TSle Analyst,
Printed Name Jon Fumes
Production 6 Revenue Accounting NOTE: All volumes must be corrected to pressure of 14.65 ps
and o a temperature of SO degrees F.
- Authority 20 AAC25 235
5/31/2016
CONSERVATION ORDER NO. 219
GAS FLARING OR VENTING INCIDENTS
CPF k3
May2016
PLANNED
VOLUME ACTION TAKEN TO MINIMIZE
DATE TIME MSCF DESCRIPTION OF FLARING EVENT UNPLANNED VOLUME
FLARING OR VENTING EVENTS GREATER THAN 1 HOUR
Pipeline was depressurized to the process
06:00:00 PM - prior to nitrogen purging to minimize the
5/11/2016 06:00:00 PM 11 volume of gas purged to the atmosphere.
TOTAL OVER 1 HOUR 11
Planned> 1 Hour 11
PLANNED EVENTS LESS THAN 1 HOUR
Flare or Vent Volumes
Greater than 1 hour
11
Less than 1 hour
1,947
Continuous Assist
0
Pilot and Purge
16,858
TOTAL FLAREDNENTED 18,816
Y Facility maintenance completed
STATE OF ALASKA
ALASKA OIL AND GAS CONSERVATION COMMISSION
FACILITY REPORT OF PRODUCED GAS DISPOSITION
1. Facility Number2. Facility Name 3. Field
4- Operator
S. MonwWr of Disposition
0290000023 CENTRAL PROCESSING FACILITY #3 KUPARUK RIVER UNIT
CONOCOPHILUPS ALASKA, INC.
61307201611:59:69 PM
DhposttlonVolume MCF
10. Forprodustion from mupple pools, list WnhibuRon of each pool es s percentof Total Volume
S. Sold
4,062
Pool Name
Pool Cade Percent
7. Reinjected
0
KUPARUK RIVER UNIT
490100 100,000%
8. Flared or vented l hour or less
1.111
9. Flared a vented more then 1 hour (see insa.)
3,011
10. Pilot and Purge
15,400
11. Assist Gas
0
100000%
12. Fuel gas used In lease operations
415,227
13. Other (see Instructions).ONy
-.
.. s LTL -
14, TOTAL VOLUMES (ITEMS 6.13)
436,611
Authodzatlon>1hf Safety
Oar MCF
15. NGL e lam
0
Lease Use
MCF
16. Purchased! pas
gas
0
Can "lion
MCF
17. Transferred from:
589,777
Walk:
MCF
18. Transferred to: (Express as a negative A)
(337,010)
Commissioner
Date
19. Remarks: ed does not include volumes of uk Gas
production reflected on line 17. Line 6 is Oooguruk sales 0 Nikaitchuq sales 3,620, and Air Force
ion Sale 44vol
Power generation sale 442. Line 76 is Oooguruk returned gas.
gas.
I hereby ceNy that the foregoing is true and correct k the best or my knowledge
Signature Mrs Analyst,
Production & Revenue Accounting
OTE: All volumes must be corrected to PMMM of 14.65 Rei
and to a temperature of 60 degrees F.
Primed Name Jon Pumas
Authority 20 AAC25 235
?) N-4-
6/30/2016
CONSERVATION ORDER NO. 219
GAS FLARING OR VENTING INCIDENTS
CPF #3
June -2016
PLANNED
VOLUME ACTION TAKEN TO MINIMIZE
DATE TIME MSCF DESCRIPTION OF FLARING EVENT UNPLANNED VOLUME
FLARING OR VENTING EVENTS GREATER THAN 1 HOUR
11:37:00 AM - Instrumentation was demoing old GLC
6/9/2016 12:48:00 PM 3,011 wiring, post panel upgrade.
TOTAL OVER 1 HOUR 3,011
Planned > 1 Hour 0
PLANNED EVENTS LESS THAN 1 HOUR
Flare or Vent Volumes
Greater than 1 hour
3,011
Less than 1 hour
1,111
Continuous Assist
0
Pilot and Purge
15 400
TOTAL FLARED/VENTED 19,522
Gas rates were cut to 80001GOR.
Instrumentation landed wires, GLC was
restarted and plant returned to normal
N operations.
STATE OF ALASKA
ALASKA OIL AND GAS CONSERVATION COMMISSION
FACILITY REPORT OF PRODUCED GAS DISPOSITION
1. Fac ft Number
0200000023
2. Fai Name
CENTRAL PROCESSING FACILITY#r 11
3. Reid
Ku kPJver Unit
a Operator
CONOCOPHILLIPS COMPANY
5. MerlBWear m oispoi
7/31116 10:24.34 AM GMT -05:00
Disposition
Volume MCF
10. Forpoduchbn In rh mui boal.,
Aat conMu17an of each bouleas Pencent aToral vah me
8. Sdtl 5489
Pod Name
Pool Cade
Percent
7. Reinjected 0
KUPARUKRMER UNIT
480100
100.00%
8. Flared or vented 1 hour or fess 1991
9. Flared or vented more man 1 hour (see Ini 0
10. Pilot and Purge 17011
11. Assist Gas
f ao.pp%
12. Fuel gas used in Wag operations 304314
13. Omer sea Instructors
A fi ^'±t "'�J Ltt' +:'+dk {pg�,g, 5 ir' ^•
14. TOTAL VOLUMES OTEMS 6-1 328807
Aumorbation>l hr Sefey MCF
15. NGL GasE uimient p
Lease Use MCF
18. PurchWad gas p
Cdnsarvatbn MCF
17. Transferred from 620151
Waste: MCF
18. Transferred to: rens as a regi # _237209
Commissioner Date
19. Remarks: Reinjected vol does not indude volumes of Ooogumk GasproduLn reflected on line 17. Une 6 is Ooogumk Was 0 Nilumcnuq sales 5,067, and Air Face Pourer generation sale 432. Line 18 is 000guruk returned gas.
I hereby partly that me foregoing Is true and correct to m est m my Imowledga
Slgnalure
Printed Name Jon Fumes
TMe A.". Prowclion a Revenue A.Min NOTE: All volumes must be corrected to pressae 011185 paid
and Io a temperature of 80 degrees F.
Phone 918.661.0584 AAhonty 20 AAC23 235
Form 10-422 Rev. W2009
713112016
CONSERVATION ORDER NO. 219
GAS FLARING OR VENTING INCIDENTS
CPF #3
July -2016
PLANNED
VOLUME ACTION TAKEN TO MINIMIZE
DATE TIME MSCF DESCRIPTION OF FLARING EVENT UNPLANNED VOLUME
FLARING OR VENTING EVENTS GREATER THAN 1 HOUR
0
TOTAL OVER 1 HOUR
Planned> 1 Hour
PLANNED EVENTS LESS THAN 1 HOUR
Flare or Vent Volumes
Greater than 1 hour
0
Less than 1 hour
1,991
Continuous Assist
0
Pilot and Purge
17,013
TOTAL FLAREDIVENTED 19,004
STATE OF ALASKA
ALASKA OIL AND GAS CONSERVATION COMMISSION
FACILITY REPORT OF PRODUCED GAS DISPOSITION
1. Facility Number
0290000023
2. Facility Name
CENTRAL PROCESSING FACILITY 93
3 Feld
Kuparuk River Unit
4 Operator
ICONOCOPHILLIPS COMPANY
5. Momww of Disposltkm
I M11167:46:37AM GMT -05:00
Disposition
Volume MCF
20. Foromduadon from m%db
/s,
Fst conMbuson ofesce Doe ase percent Of TOW Volume
6 Sold
10239
Pool Name
Pool Code
Percent
7. Ralneoted
0KLIPARUKRiVER
UNIT
490700
100,00%
S. Flared of vented 1 hour or lees
1873
9. Flared or vented more than 1 hour(ses Istr.)
0
10. Pilot and Pure
1awe
11, ASSISI CNN
100.00%
12. Fuel gas used in lease operations
340491
13. Oliver (Us instrucdore)
0
W,ara�x
�.�z! . q 11+^S'" a r.
14. TOTAL VOLUMES (ITEMS 6-13)
365971
Authori abon N hr
bare MCF
15. NGL Gas Equivalent
0
Lease Use MCF
15. Purchased gas
0
Con eNaaon MCF
17. Transfxmd from:
885119
Waste:
MCF
18. Transferredlo:(Ex ressasa afne R)
-312887
Commissioner Date
19. Remarks: Regeded vol does not include volumes of Ooogmuk Gas production leaeuled on line 17. Line 6 is Oooguruk sales 0 Niodichuq aaMs 9,752, and Air Force Power generation sale 467 Lie 161s Ooogumk mWrned gas.
I hereby car ify that the fixegoing is We and collect to the best of My knowledge
Signature
Pninled Nam. Jon Pumas
We Analys, PR dC 6 Reyenu4A=urding
Phone 916.861.0584
NOTE: All volarMa must be CO"CtOd to prsesum of 14.65 Osla
and to a lempenahme of 50 degrees F.
ALithimly, 20 AAC25235
Form 10122 Rev. 512009
813 112 01 6
CONSERVATION ORDER NO. 219
GAS FLARING OR VENTING INCIDENTS
CPF #3
August -2016
PLANNED
VOLUME ACTION TAKEN TO MINIMIZE
DATE TIME MSCF DESCRIPTION OF FLARING EVENT UNPLANNED VOLUME
FLARING OR VENTING EVENTS GREATER THAN 1 HOUR
0
TOTAL OVER 1 HOUR
Planned> 1 Hour
PLANNED EVENTS LESS THAN 1 HOUR
Flare or Vent Volumes:
Greater than 1 hour
0
Less than 1 hour
1,873
Continuous Assist
0
Pilot and Purge
13,368
TOTAL FLAREDNENTED 15,241
STATE OF ALASKA
ALASKA OIL AND GAS CONSERVATION COMMISSION
FACILITY REPORT OF PRODUCED GAS DISPOSITION
1. Facl9ty Number
0790000023
2. Facility Name
CENTRAL PROCESSING FAClUrFY#3
3. Field
Ku ruk River Unit
4 Operator
CONOCOPHILUPS COMPANY
5. MonBwear of Disposigan
&30/189:55:46 AM GMT -O&00
Disposition
Volume MCF
10545
0
1085
300
15342
520533
D
547865
0
0
1 392534
1 -250746
20. FiDrproduchicu, from mu! a pools 71st Wambu5on ofesch i,nol as a psmentof Total VOWme
e Sold
Pool Name
Pool Code
Percent
7. Reelected
KUPARUKRrvERUNrr
490100
100000%
8. Fleretl or vente0 l tour or less
9. Flared or vented more Nan 1 hour see insu.)
10. Pod aro Purga
11. Assist Gas
100.00%
12. Fuel gas, used in lease operations
13. Other seainshuclions)
.I
O0caUse6my �E
14. TOTAL VOLUMES rrEMS 8.13
Q
AufIDnmtiSon >1 hr 5 e MOF
15. NGL Gas Equivalent
Lease Use MCF
15, Purchased gas
Conservation MCF
17. Transfered from:
V'rads. MCF
18, Transferred to: (Express as a negative
.Vn
1 / `� ! b—
Commisslonsr Date
19. Remarks: Reinjected vol does not induce volumes of Oooguruk Gas production reflected on line 17. Une 6 is Oooguruk sales 1,441 Nikaltchuq sales 8,713, and Airforce Pourer generator, sale 381. Late 18 is Ooogun& returned pas.
I hereby certify that the foregoing Is We and c ct to the est of my knowledge
Signature Title Analysb Production 8 Revenue nc(ounang NOTE: All volumes must be corroded to pressure of 14.65 psla
and to a temperature of 50 diagnose F.
Primed Name Jon Fumes Phone 918.651.0584 ALdhomy 20 AAC25235
Form 10422 Rev. 5!2009
9/3012016
CONSERVATION ORDER NO. 219
GAS FLARING OR VENTING INCIDENTS
CPF #3
September -2016
PLANNED
VOLUME ACTION TAKEN TO MINIMIZE
DATE TIME MSCF DESCRIPTION OF FLARING EVENT UNPLANNED VOLUME
FLARING OR VENTING EVENTS GREATER THAN 1 HOUR
Planned 3 year ESD and PM plant shutdown
at CPF3. Flare event included controlled
05:34:00 AM - shutdown and plant hlowdown as per the
9/1712016 12:42:00 PM 380 planned PM.
TOTAL OVER 1 HOUR 380
Planned > 1 Hour 380
PLANNED EVENTS LESS THAN t HOUR
Flare or Vent Volumes:
Greater than 1 hour
380
Less than 1 hour
1,066
Continuous Assist
0
Pilot and Purge
1L342
TOTAL FLAREDIVENTED 16,787
Entire facility was completely shutdown
Y and depressurized.
STATE OF ALASKA
ALASKA OIL AND GAS CONSERVATION COMMISSION
FACILITY REPORT OF PRODUCED GAS DISPOSITION
1. Pitchy Number
2. Facility Name
3. Feld
4 Operator
ICONOCOPHILLIPS
5. Monm/Year of Disposition
0290600023
O ENTRAL PROCESSING FACILITY #3
Kuparuk River Unit
COMPP
IM11161:33:28 PM GMT -06:00
Din oehian
Volume MCF 20. Forpreduct/en Adm mufflph,
pools, IAsl Confribua'on Ol each o/asd ercrent o/TolaIVOILTB
6. Sold
13476 Pool Name
Pool Code Percent
7. Reinjected
0 KUPARUKRIVER UNIT
490100 100,00%
8. Flared or vented 1 hour or leu
929
9. Fared or vented more than 1 hour see instr
0
10. Pilot and Pure
16019
11, ASSISI Gds
100.00%
12. Fuel gas used in lease operations
614260
13. Other see instructions)
0
Ortloial
14.TOTALVOLUMESITEMS 6.13
644684 AuUpniason>1 hr
ISafety MCF
15. NGLGasEquivalent
0
Lease Use MCF
16. Purchased gas
0
Conservatldn MCF
17. Transferred from:
655595 West.:
MCF
19. Transferred to: Express as a negative #)
5224M
Commissioner Date
19. Remarks: Reinjected vol does not Include volumes of ocaguruk Gas production reflected on line 17. Une 6 is Oooguak sales 0 Nlkaitchuq utas 12,957, and Air Force Power generation sale 519. Line 18 is Ooogumk relumed gas.
I hereby certify that the foregoing is true and ddrtect a nest or my knowledge
Signature
Title Analyst Praduclona Revenue Accounting
NOTE: All Vdumes must be Corrected to pressure of 14.65 psia
and to a lempealure of 60 degrees F.
Pnnted Name don Fumes
Phone 018.661.0584
Authanly 20 AAC25235
Fonn 10422 Rev. 512009
1 0/3112 01 6
CONSERVATION ORDER NO. 219
GAS FLARING OR VENTING INCIDENTS
CPF #3
October -2016
PLANNED
VOLUME ACTION TAKEN TO MINIMIZE
DATE TIME MSCF DESCRIPTION OF FLARING EVENT UNPLANNED VOLUME
FLARING OR VENTING EVENTS GREATER THAN 1 HOUR
0
TOTAL OVER 1 HOUR
Planned > 1 Hour
PLANNED EVENTS LESS THAN 1 HOUR
Flare or Vent Volumes
Greater than 1 hour
0
Less than 1 hour
929
Continuous Assist
0
Pilot and Purge
16,019
TOTAL FLAREDIVENTED 16,948
STATE OF ALASKA
ALASKA OIL AND GAS CONSERVATION COMMISSION
FACILITY REPORT OF PRODUCED GAS DISPOSITION
1. FadOty Number 2. Faclily Name 3. Field
0280000023 CENTRAL PROCESSING FACILRY 93 Ku aruk River
perator
LNOCOPHILLIPS,CONIPANY
S, Monlh/Yearm dspositlon
I 11Wl 6 1:17:43 PM GMT -08:00
Disposition Volume MCF
20. Forproducdbn from muatte poots, list confnbufbn otead8 woleea permtofTojej Volume
6. Sord 16987
Pool Name Pool Code
Pe,cent
7. Reinjected 0
KUPARUKRNER UNIT 490100
100.0035
8. Flared or vented 1 Mur or less 1543
9. Fitrod or vented more than 1 hour see hull 0
16. Riot and Pure 15390
11. ASelet Gas
100.00%
12, Fuel 9W used in lease opemtb,, 510022
13. O6ter we m inuclions) 0
,...ORrnel Uie bnl "5 X3041
14. TOTAL VOLUMES ITEMS 6.13 543922
Authorization sl hr Sa MCF
15, NGL Gas Equivalent 0
Lease Use MCF
16. Purchased W 0
Conaervegon MCF
17. Transferred from: 753710
Waste: MCF
18. Transferred to: (Express as a ayrte p)
Cos 18,4 Data
79. Remarks: Re4Qeutetl vol does not inrJude volumes of poogurvk Gas pmtluctlon reflected on 9rre 17. Line SIB Oobgumk Sele6 0 Nikaitchuq wiles 78.480, 0, a era Air Force Power generation Sale 507. Line ISIS Oooguruk renamed gas.
I hereby oerlSY that the bregoingl{sue aldmn knowledge
Signature � Title Analysq Pmd.a.n s R.me, A.rtrno NCTIR All vdumes must be corrected to pressure M 14.65 psis
and to a temp"birs of 80 degrees F.
Printed Name Erin Venamdal Phone 916661-6411 Authority 20 AAC25235
Foran 10472 Rev. 8=9
11/30/2016
CONSERVATION ORDER NO. 219
GAS FLARING OR VENTING INCIDENTS
CPF #3
November -2016
PLANNED
VOLUME ACTION TAKEN TO MINIMIZE
DATE TIME MSCF DESCRIPTION OF FLARING EVENT UNPLANNED VOLUME
FLARING OR VENTING EVENTS GREATER THAN 1 HOUR
0
TOTAL OVER 1 HOUR
Planned> 1 Hour
PLANNED EVENTS LESS THAN 1 HOUR
Flare or Vent Volumes
Greater than 1 hour
0
Less than 1 hour
1,543
Continuous Assist
0
Pilot and Purge
15,390
TOTAL FLAREDIVENTED 16,933
STATE OF ALASKA
ALASKA OIL AND GAS CONSERVATION COMMISSION
FACILITY REPORT OF PRODUCED GAS DISPOSITION
1. Facility Number 2. FatlFly Name
0290000023 CENTRAL PROCEssING FAciuTY#3
Disposition
3. Field
Ku aruk Rlver Unh
Volume MCF
4Operator 5.MonijVywef DispoA,,
CONOCOPH ILUPS COMPANY 129tH 55:32:22 AM GMT -ono
20. Fee rodm fon fan mw ,kat wnbfbueon &"on Pewtera Volume
8. Sold
19832
Pool Name
PencenforTatal
Pool Code Percent
7. Reinjected
0KUPARUIORIVER
UNIT
490100 100,00%
S. Flared or vented 1 hour or less
2828
9. Flared a Vented more ton 1 hour see hta0',
0
10. Pilot and Purge
15528
11. Assist Gas
00.00%
12. Fuel gas used In lease 2iWn6
638005
13. Other see instructions)
0
_R
.::.. .d-111 I IFle
,a..f. wUR':�.,»'t. «�,.a9a .+ arM 1 ��� 9�MIMI i0if,11�.
AldhOnIDOon N hr Sate MCF
14. TOTAL VOLUMES ITEMS 8.13
578293
15. NGL Gas E uivelant
0
Lease Use MCF
15. Purchased as
0
Coreervason MCF
17. Trenaferred from:
937055
Waste; MCF
18. Tranafened lo: sa es a ne9ffiNe #
..573037
Commissioner Date
19. Remake: Ralnject al vel does not hwtutle volumes MOoogauk Gas NOductlon reileoted on Ilea 17. Lkw 8 is OoNumk sales 0 NikandMq sales 19,211, and" Fore, Power go,mtion We 821. Una 18la Oooguruk returned gas.
I hereby certify that the foregoing is true and oomeet to the best of my knowledge .
TO "-Yet PrX ian 6 Revenue Armuru. NOTE: All Volumes must be MMW d to Pressure of 14.85 psis
and b a temperature Of 80 degrees F.
Pnmetl Name Eon Vanaredel Phone 818-Bti1-ti411
Authority 20 AAC25235
Form 10422 Rev. 512009
CONFIDENTIAL pursuant to: AS 43.05.230, AS 40.25.100, AS 38.05.035 (a)(8), and AS 38.05.036 to
12131/2016
CONSERVATION ORDER NO. 219
GAS FLARING OR VENTING INCIDENTS
CPF #3
December -2016
PLANNED
VOLUME ACTION TAKEN TO MINIMIZE
DATE TIME MSCF DESCRIPTION OF FLARING EVENT UNPLANNED VOLUME
FLARING OR VENTING EVENTS GREATER THAN 1 HOUR
0
TOTAL OVER 1 HOUR
Planned > 1 Hour
PLANNED EVENTS LESS THAN 1 HOUR
Flare or Vent Volumes
Greater than 1 hour
0
Lessthan 1 hour
2,828
Continuous Assist
0
Pilot and Purge
16y28
TOTAL FLAREDIVENTED 19,456