HomeMy WebLinkAboutNorthstar - Hilcorp Alaska LLCState of Alaska AOGCC Gas Disposition Files Year: 2016 Facility: Northstar Operator: Hilcorp Alaska LLC STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMMISSION Name 6. Sold 0 7. Reinjected 18,264,958 8. Flared or vented 1 hour or less 341 9. Flared or vented more than 1 hour (see instr.) 0 10. Pilot and Purge 5,486 11. Assist Gas 0 12. Fuel gas used in lease operations 550,773 13. Other (see instructions) 0 14. TOTAL VOLUME (ITEMS 6-13) 18,821,558 15. NGL Gas Equivalent 0 16. Purchased gas: 383 17. Transferred from: (Off -lease Gas) 0 18. Transferred to: 0 19. Remarks: Gas purchased from BPXA PBU for fuel at Caribou Crossing 383 Total Volume. Use of each pool as a percent of hereby certify that the foregoin is true and correct to the best of my knowledge. Note: All volumes must be corrected Signature Title Production Analyst pressure of 14.65 psia and to a temperature of 60o F. Authority 20 STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMMISSION FACILITY REPORT OF PRODUCED GAS DISPOSITION 1. Facility Number 2. Facility Name 3. Field 4. Operator 5. Mont" rYear of Disposition 0290000025 Northstar Northstar HILCORP ALASKA LLC Februa 2016 Disposition I Volume MCF 1 20. For production from multiple pools, list contribution of each pool as a percent of Total 6. Sold 0 7. Reinjected 17,204,783 8. Flared or vented 1 four or less 498 9. Flared or vented more than 1 hour (see instr.) 0 10. Pilot and Purge 5,132 11. Assist Gas 0 12. Fuel gas used in lease operations 516,005 13. Other (see instructions) 0 14. TOTAL VOLUME (ITEMS 6-13) 17,726,418 15. NGL Gas Equivalent 0 16. Purchased gas: 1,055 17. Transferred from (Off -lease Gas) 0 18. Transferred to: 0 I hereby certify Gas purchased from BPXA PBU for fuel at Caribou Crossing 1,055 correct to the best of my knowledge. Title Pool Name Use 5901 11% Note: All volumes must be corrected pressure of 14.65 psia and to a temperature of 60o F. Authority 20 1. Facility Northstar STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMMISSION 6. Sold 0 7. Reinjected 17,204,783 8. Flared orvented 1 hourorless 498 9. Flared or vented more than 1 hour (see instr.) 0 10. Pilot and Purge 5,132 11. Assist Gas 0 12. Fuel gas used in lease operations 517,060 13. Other (see instructions) 0 14. TOTAL VOLUME (ITEMS 6-13) 17,727,473 15. NGL Gas Equivalent 0 16. Purchased gas: 1,055 17. Transferred from: (Off -lease Gas) 0 18. Transferred to: 0 19. Remarks: Gas purchased from BPXA PBU for fuel at Caribou Crossing 1,055 the foregoing is true Title 1 >1 hr. Name LLC OIL Lease Use Conservation each pool as a percent rte: All volumes must be corrected to pressure of 14.65 psia and to a temperature of 60o F. Authority 20 STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMMISSION FACILITY REPORT OF PRODUCED GAS DISPOSITION 1. Facility Number 0290000025 2. Facility Name 1 Northstar 3. Field 4. Operator 5. Month/Year of Disposition Northstar I HILCORP ALASKA LLC I March 2016 Disposition Volume MCF 20. For production from multiple pools, list contribution of each pool as a percent of Total Volume. 6. Sold 0 Pool Name Pool Code Percent 7. Reinjected 18,747,925 NORTHSTAR, NORTHSTAR OIL 590100 91.91 NORTHSTAR, KUPARUK C UNDEF OIL 590150 8.09% 8. Flared or vented 1 hour or less 294 9. Flared or vented more than 1 hour (see instr.) 917 10. Pilot and Purge 5,309 11. Assist Gas 0 12. Fuel gas used in lease operations 556,048 13. Other (see instructions) 0 Official Use Only Authorization>1 hr: Safety cJ�� MCF 14. TOTAL VOLUME (ITEMS 6-13) 19,310,494 Lease Use MCF 15. NGL Gas Equivalent p Conservation MCF 16. Purchased gas: 1 759 Waste: MCF 17. Transferred from: (Off -lease Gas) 0 /Y eC40-4t6a1---9—Date 18. Transferred to: 0 Gas purchased from BPXA PBU for fuel at Caribou Crossing 1,759 certity that the foregoi is true and corr ct o th best of my knowledge. Note: All volumes must be corrected Signature a9 rm i Title Production Analyst pressure of 14.65 psta and to a fad Na.. I uonnn rnfmW— ..1___ -.... ___ __.. _ temperature of 60o F. Authority 20 Northstar RA.,h_1R 917 3/1/2016 124250 0290000025 3/29/2016 18:30:00 22:00:00 3/29/2016 U 500 FROZEN PRESSURE TRANSMITTER OPERATIONAL UPSET - RESTART UNIT 3/1/2016 124250 0290000025 3/29/2016 19:57:00 21:19:00 3/29/2016 U 86 FROZEN PRESSURE TRANSMITTER OPERATIONAL UPSET- RESTART UNIT 3/1/2016 124250 0290000025 3/30/2016 0:14:00 1:55:00 3/30/2016 U 170 UNITSURGE OPERATIONAL UPSET - RESTART COMPRESSOR 3/1/2016 124250 0290000025 3/30/2016 0:16:00 1:32:00 3/30/2016 U 161 UNIT SURGE OPERATIONAL UPSET - RESTART COMPRESSOR 917 STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMMISSION FACILITY REPORT OF PRODUCED GAS DISPOSITION 1. Facility Number 2. Facility Name 3. Field 4. Operator 5. Month/Year of Disposition 0290000025 1 Northstar Northstar HILCORP ALASKA LLC d12016 Disposition Volume MCF J 20. For production from multiple pools, list contribution of each pool as a percent of 6. Sold 0 7. Reinjected 16,917,389 8. Flared or vented 1 hour or less 3,097 9. Flared or vented more than 1 hour (see instr.) 370 10. Pilot and Purge 5,309 11. Assist Gas 0 12. Fuel gas used in lease operations 508,498 13. Other (see instructions) 0 14. TOTAL VOLUME (ITEMS 6-13) 17,434,663 15. NGL Gas Equivalent 0 16. Purchased gas: 1,607 17. Transferred from: (Off -lease Gas) 0 18. Transferred to: 0 Gas purchased from BPXA PBU for fuel at Caribou Crossing 1,607 Total Volume. Use Date certify that the foregoing is true and correct to the best of my knowledgei 6.. Note: All volumes must be corrected Signature //J�J7/Jl� Title Production Anal t pressure of 14.65 psla and to a temperature of 60o F. Authority 20 V7-7-- 411/1— Northstar 4/1/2016 1 124250 102900000251 4/2/2016RESTART OF THE LP 21:08:00I 23:29:00 I 4/2/2016 I N 1370.0 (COMPRESSOR AFTER PLANT Total > 1hr: 370.0 NGL PRODUCTION COULD BE CUT MINIMIZE FLARING. Number Facility Name STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMMISSION 6. Sold 0 7. Reinjected 17,073,473 8. Flared or vented 1 hour or less 111 9. Flared or vented more than 1 hour (see inslr.) 0 10. Pilot and Purge 5,309 11. Assist Gas 0 12. Fuel gas used in lease operations 525,347 13. Other (see instructions) 0 14. TOTAL VOLUME (ITEMS 6-13) 17,604,240 15. NGL Gas Equivalent 0 16. Purchased gas: 1,600 17. Transferred from: (Off -lease Gas) 0 18. Transferred to: 0 19. Remarks Gas purchased from BPXA PBU for fuel at Caribou Crossing certify that the foregoing istrueand correct to the best of my knowledge. Signature --��/ .M..�Z.� - Title 1,600 1 from Total Use each pool as a Note: All volumes must be corrected to pressure of 14.65 psis and to a temperature of 60o F. Authority 20 STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMMISSION Sold Reinjected Flared or vented 1 hour or less Flared or vented more than i hour (see instr.) Pilot and Purge Assist Gas 2,Fuel gas used in lease operations 3. Other (see instructions) 4. TOTAL VOLUME (ITEMS 6-13) 5. NGL Gas Equivalent S. Purchased gas: 7. Transferred from: (Off -lease Gas) 8. Transferred to: 9. Remarks: Gas purchased from BPXA PBU for fuel at Caribou Crossing olume MCF 20. For production from multiple pools, list contribution of each pool as a perces Total Volume. 0 Pool Name Pool Code Pen 14,785,639 NORTHSTAR, NORTHSTAR OIL 590100 91.1 NORTHSTAR, KUPARUK C UNDEF OIL 590150 8.81 2,336 3,704 5,309 0 459,283 0 Official Use Only Authorization >l h[ Safety �Q A_ i MCF ) 15,256,270 Lease Use MCF 0 Conservation MCF 1,666 Waste: MCF 0 Com I si n6— _Y Date 0 1,666 Note: All Volumes must be corrected Title Production Analyst pressure of 14.65 psia and to a temperature of 60o F. Authority 20 Northstar 62016 124250 10290000025 6/26/2016 11:06:00 16:16:00 1 6/26/2016 U 2713 PLANTSTARTUP PLANT STARTUP 6/1/2016 124250 0290000025_ 6/26/2016 . 17:07:00 18:38:00 6/26/2016 U 1 991 IPLANTSTARTUP I PLANT STARTUP 3704 Link, Liz M (DOA) From: Loepp, Victoria T (DOA) Sent: Thursday, June 23, 2016 9:18 AM To: Drew Anderson Cc: AOGCC Reporting (DOA sponsored) Subject: RE: Planned Maintenance and Flaring at Northstar Drew Approval is granted to flare up to 30,000 MCF total volume over up to 5 days for the purpose of the LP Compressor upgrade. Thanx, Victoria Victoria Loepp Senior Petroleum Engineer State of Alaska Oil & Gas Conservation Commission 333 W. 7th Ave Anchorage, AK 99501 Work: (907)793-1247 Victoria. LoepmMalaska.gov CONFIDENTIALITY NOTICE; This e-mail message, including any attachments, contains information from the Alaska Oil and Gas Conservation Commission (AOGCC), State of Alaska and is for the sole use of the intended recipieni(s). It may contain confidential and/or privileged information. The unauthorized review, use or disclosure of such information may violate state or federal law. If you are an unintended recipient of this e-mail, please delete it, without first saving or forwarding it, and, so that the AOGCC is aware of the mistake in sending it to you, contact Victoria Loepp at (907)793-1247 or Victorio.LoeooCralaska.aov From: Drew Anderson[mailto:anandersonCalhilcorp.com] Sent: Friday, June 03, 2016 3:49 PM To: Loepp, Victoria T (DOA) Cc: Larry Greenstein; Samantha Porreca - (C) Subject: Planned Maintenance and Flaring at Northstar Victoria, We are planning on performing a controls upgrade to the LP Compressor Unit at Northstar, which will require a shutdown of the LP Compressor and flaring its gas. Our operations group is estimating 5 days to perform the work on the compressor with a potential flare of 30,000 MCF during that time. The purpose of this upgrade to the compressor is to improve reliability and overall runtime, which will result in fewer future flaring events. To mitigate the flaring event, we are strategically sheltering the compressor work to coincide with 2 other planned facility shutdowns. During the last week in June, we will be performing our annual Northstar BESD. Also, there is a planned TAPS outage on June 25". Both of these events are anticipated to take 1.5-2 days total and will also result in flaring. By advantageously scheduling all three events to occur simultaneously, we are reducing the overall flaring by 23%-33%. For reference, Northstar was shutdown for approximately 13 hours for last year's BESD and flared 3200 MCF. During these operations, we will take steps to minimize flaring where possible and all flaring data will be captured in our monthly 10-422 and excess flare log. Please let me know if you have any questions. Thank you, Drew Drew Anderson, PE PMP I Environmental Specialist =ClHilcorp Alaska, LLC anander,son@hilcorp.com P (907)777-84881 F (907)777-8560 1 M (907)382-0987 STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMMISSION 6. Sold 12. Fuel gas used in lease operations 0 7. Reinjected 14. TOTAL VOLUME (ITEMS 6.13) 10,835,010 8. Flared or vented 1 hour or less 16. Purchased gas: 3,743 9. Flared or vented more than 1 hour (see instr.) 18. Transferred to: 0 10. Pilot and Purge 5,486 11. Assist Gas 0 12. Fuel gas used in lease operations 384,536 13. Other (see instructions) 0 14. TOTAL VOLUME (ITEMS 6.13) 11,228,775 15. NGL Gas Equivalent 0 16. Purchased gas: 1,879 17. Transferred from: (Off -lease Gas) 0 18. Transferred to: 0 19. Remarks: Gas purchased from BPXA PBU for fuel at Caribou Crossing 1,879 production from >1 Use of each pool as a 87 ��'"Y^_• •��_ ���=y����y oe anu wireGl I e URI dT my Knowledge. Note: All volumes must be corrected Signature Title Production Analyst pressure of 14.65 psia and to a _ _ _ ___ __ temperature of 60o F. Authority 20 IPtl Name I Penna 1Alawine ... _ _ ... .. _ STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMMISSION FACILITY REPORT OF PRODUCED GAS DISPOSITION 1. Facility Number 0290000025 2. Facility Name Northstar 3. Field 4.Operator Nonhstar HILCORP ALASKA LLC 5. Month/Year of Disposition August 2016 Disposition Volume MCF 20. For production from multiple pools, list contribution of each pool as a percent of Total Volume. a% S. Sold 0 Pool Name Pool Code Percent 7. Reinjected 15,791,191 NORTHSTAR, NORTHSTAR OIL 590100 88.72% NORTHSTAR, KUPARUK C UNDEF OIL 590150 11.28% B. Flared or vented 1 hour or less 2,946 9. Flared or vented more than 1 hour (see instr.) 2,741 10. Pilot and Purge 5,486 11. Assist Gas 0 12. Fuel gas used in lease operations 495,701 13. Other (see instructions) 0 Official Use Only Authorization >1 hr: Safety MCF 14. TOTAL VOLUME (ITEMS 6.13) 16,298,065 Lease Use MCF 15. NGL Gas Equivalent 0 ConservationI �7#1 MCF lb/b 16. Purchased gas: 1,979 Waste: MCF 17. Transferred from: (Off -lease Gas) 0 10-12 —16 / Commissioner -- Date 18. Transferred to: 0 Gas purchased from BPXA PBU for fuel at Caribou Crossing 1,979 true and Signature my Note: All volumes must be corrected pressure of 14.65 psia and to a temperature of 60o F. Authority 20 AOGCC Excess Flare Report August -2016 NORTHSTAR — NSU GATHERING �; - Ending RPtW F' OpNo FacOByNo Dateftaied StartTime Time End Date Planned MCF Description of Flaring Event Action Taken to Minimize VOID,.. 8/1/2016 124250 0290000025 8/12/2016 25300 3:58:00 8/12/2016 P 153 EXCESS FLARING DUE TO LIQUIDS UNLOADING OF WELL NS -18 BROUGHT ON EXCESS FLARING NECESSARY UNTIL LIQUIDS UNLOADING COULD BE COMPLETE. EXCESS FLARING DUE TO LIQUIDS EXCESS FLARING NECESSARY WHILE TRYING 8/1/2016 124250 0290000025 8/13/2016 12:18:00 22:39:00 8113/2016 U 1,301 UNLOADING OF WELL NS -18 BROUGHT ON TO UNLOAD LIQUIDS INTO THE TEST INTO TEST SEPARATOR. SEPARATOR. EXCESS FLARING DUE TO LIQUIDS EXCESS FLARING NECESSARY UNTIL LIQUIDS 8/1/2016 124250 0290000025 8/28/2016 4:53:00 10:52:00 8/28/2016 U 1,287 UNLOADING OF WELL N -33A. UNLOADING COULD BE COMPLETE AND WELL BROUGHT BACK ONLINE. 2,741 STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMMISSION FACILITY REPORT OF PRODUCED GAS DISPOSITION 1. Facility Number 2. Facility Name 3. Field 4. Operator 5. Month/Year of Disposition 0290000025 Northstar Northstar HILCORP ALASKA LLC Se tember 2018 Disposition Volume MCF 20. For production from multiple pools, list contribution of each pool as a percent of 6. Sold 0 7. Reinjected 15,536,610 8. Flared or vented 1 hour or less 20 9. Flared or vented more than 1 hour (see instr.) 1,876 10. Pilot and Purge 5,309 11. Assist Gas 0 12. Fuel gas used in lease operations 482,558 13. Other (see instructions) 0 14. TOTAL VOLUME (ITEMS 6-13) 16,026,373 15. NGL Gas Equivalent 0 16. Purchased gas: 8 17. Transferred from: (Off -lease Gas) 0 18. Transferred to: 0 19. Remarks Gas purchased from BPXA PBU for fuel at Caribou Crossing 8 hereby certify that the foregoing is true and correct Total Volume. Pool Name Pool Code Percent NORTHSTAR, NORTHSTAR OIL 590100 88 33% Use /8 10-Z6 -/( Note: All volumes must be corrected Signature ioninr %md Title Production Analyst pressure of 14.65 psia and to a temperature of 60o F. Authority 20 Ending RptDate OpNo FacilityNo Date Flared StartTime Time 9/1/2016 124250 0290000025 9/24/2016 716.00 15.19:00 AOGCC Excess Flare Report September -2016 NORTHSTAR — NSU GATHERING End Date Planned MCl=1.,1 wp— EXCESS FLARING DUE TO LIQUIDS 9/24/2016 U 1,876 UNLOADING OF WELL NS -33, THIS WAS A PERMITTED FLARING EVENT. 1,876 EXCESS FLARING NECESSARY UNTIL LIQUIDS UNLOADING COULD BE COMPLETE AND WELL BROUGHT BACK ONLINE. and Signature Title 1 of Dispositior er 2016 as a percent Z-�53 2-!(m -( z 1114 ) p - - Note: All volumes must be corrected to pressure of 14.65 psis and to a temperature of 60o F. Authority 20 STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMMISSION FACILITY REPORT OF PRODUCED GAS DISPOSITION 1. Facility Number 0290000025 2. Facility Name Northstar 3. Field 4.0perator Northstar HILCORP ALASKA LLC Disposition Volume MCF 20. For production from multiple pools, list o Total Volu 6. Sold 0 Pool Name 7. Reinjected 14,428,158 NORTHSTAR, NORTHSTAR OIL NORTHSTAR, KUPARUK C UNDEF OIL 8. Flared or vented 1 hour or less 929 9. Flared or vented more than 1 hour (see instr.) 2,753 10. Pilot and Purge 5,486 11. Assist Gas 0 12. Fuel gas used in lease operations 465,286 13. Other (see instructions) 0 Official Use Authorization >1 hr: Safety 14. TOTAL VOLUME (ITEMS 6-13) 14,902,611 Lease Use 15. NGL Gas Equivalent 0 Conservation 16. Purchased gas: 755 Waste: 17. Transferred from: (Off -lease Gas) 0 PLO omZ missione" r 18. Transferred to: 0 19. Remarks: Gas purchased from BPXA PBU for fuel at Caribou Crossing 755 and Signature Title 1 of Dispositior er 2016 as a percent Z-�53 2-!(m -( z 1114 ) p - - Note: All volumes must be corrected to pressure of 14.65 psis and to a temperature of 60o F. Authority 20 m�� 10/1/2016 124250 0290000025 10/21/2016 3:43:00 EXCESS FLARING NECESSARY UNTIL 10/112016 124250 0290000025 10/21/2016 3:49:00 UNLOADED AND WELL BROUGHT BACK 10/1/2016 124250 0290000025 10/25/2016 1:42:00 AOGCC Excess Flare Report October -2016 NORTHSTAR — NSU GATHERING 5:13:00 10/21/2016 U 338 EXCESS FLARING DUE TO SHUTDOWN OF HP EXCESS FLARING NECESSARY UNTIL FLARE A FOR MAINTENANCE. MAINTENANCE COMPLETE. 6:23:00 10/21/2016 U 1,868 EXCESS FLARING DUE TO SHUTDOWN OF HP EXCESS FLARING NECESSARY UNTIL FLARE A FOR MAINTENANCE. MAINTENANCE COMPLETE. EXCESS FLARING DUE TO LIQUIDS EXCESS FLARING NECESSARY UNTIL LIQUIDS 4:08:00 10/25/2016 U 546 UNLOADING OF WELL NS -33. UNLOADED AND WELL BROUGHT BACK ONLINE. 2,753 STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMMISSION Facility Number 6. Sold 0 7. Reinjected 15,105,088 8. Flared or vented 1 hour or less 1,904 9. Flared or vented more than 1 hour (see instr.) 3,020 10. Pilot and Purge 5,309 11. Assist Gas 0 12. Fuel gas used in lease operations 470,373 13. Other (see instructions) 0 14. TOTAL VOLUME (ITEMS 6-13) 15,585,694 15. NGL Gas Equivalent 0 16. Purchased gas: 3,206 17. Transferred from: (Off -lease Gas) 0 18. Transferred to: o Gas purchased from BPXA PBU for fuel at Caribou Crossing and correct to the best of my knowledge. Signature 3,206 Title 3-757-5211 20. >1 hr Total Volume. Use as a Percent 62,0 5-17-16 ,te: All volumes must be corrected to pressure of 14.65 psis and to a temperature of 60o F. Authority 20 AOGCC Excess Flare Report November-2016 NORTHSTAR — NSU GATHERING RptDate OpNo FacilityNo Date Flared Start Time Ending Time End Date Planned MCF Description of Flaring Event Action Taken to Minimize Volum EXCESS FLARING DUE TO STARTUP OF HP-8 EXCESS FLARING NECESSARY UNTIL A 11/1/2016 124250 0290000025 11/5/2016 8:01:00 10:17:0011!5/2016 U 1 262 AFTER MECHANICAL REPAIR AFTER HP-N TURBINE SHUTDOWN. COMPLETE OVERHAUL OF HP-B TURBINE IS '..CONDUCTED AND TURBINE BROUGHT BACK .ONLINE. EXCESS FLARING DUE TO LIQUIDS EXCESS FLARING NECESSARY TILL LIQUIDS 11/1/2016 124250 0290000025 11/18/2016 7:34:00 15:06:00 11/18/2016 U 1,758 UNLOADING OF WELL NS-33A, UNLOADING COMPLETE AND WELL BROUGHT BACK ONLINE. 3,020 is true Signature my Date multiple pools, Total C Use each pool as a MUF MCF,5/4� �� • MCF MCF 3 -2D -I] As: All volumes must be corrected pressure of 14.65 psis and to a temperature of 600 F. Authority 20 STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMMISSION FACILITY REPORT OF PRODUCED GAS DISPOSITION 1. Facility Number 0290000025 2. Facility Name Northstar 3. Field q Northstar Disposition Volume MCF 1 20. For prodw 6. Sold 0 7. Reinjected 18,218,592 NORTHSI NORTHSTAR 8. Flared or vented 1 hour or less 618 9. Flared or vented more than 1 hour (see instr.) 5,596 10. Pilot and Purge 5,486 11. Assist Gas 0 12. Fuel gas used in lease operations 539,251 13. Other (see instructions) 0 Authorization >1 14. TOTAL VOLUME (ITEMS 6-13) 18,769,543 15. NGL Gas Equivalent 0 16. Purchased gas: 3,536 Waste: 17. Transferred from: (Off -lease Gas) 0 18. Transferred to: 0 19. Remarks: Line 16 Gas purchased from BPYA PBU for fuel at Caribou Crossing 3,536 is true Signature my Date multiple pools, Total C Use each pool as a MUF MCF,5/4� �� • MCF MCF 3 -2D -I] As: All volumes must be corrected pressure of 14.65 psis and to a temperature of 600 F. Authority 20 AOGCC Excess Flare Report December -2016 NORTHSTAR — NSU GATHERING Ending RptDate OpNo FacilityNo Date Flared Start Time Time End Date Planned MCF EXCESS FLARING DUE TO SHUTDOWN OF LP 'EXCESS FLARING NECESSARY UNTIL 2ND 12/1/2016 124250 0290000025 12/3/2016 18:10:00 2224.00 12/3/2016 U 416 COMPRESSOR DUE TO A BAD 2ND STAGE STAGE SOLENOID IS REPLACED AND SOLENOID. ,COMPRESSOR IS RESTARTED. EXCESS FLARING DUE TO SHUTDOWN OF LP EXCESS FLARING NECESSARY UNTIL 2ND 12/1/2016 124250 0290000025 12/3/2016 19:19:00 20:37:00 12/3/2016 U 93 COMPRESSOR DUE TO A BAD 2ND STAGE STAGE SOLENOID IS REPLACED AND SOLENOID. COMPRESSOR IS RESTARTED. EXCESS FLARING DUE TO SHUTDOWN OF LP EXCESS FLARING NECESSARY UNTIL 2ND 12/1/2016 124250 0290000025 12/42016 1:12:00 7:01:00 12/4/2016 U 380 COMPRESSOR DUE TO A BAD 2ND STAGE STAGE SOLENOID IS REPLACED AND SOLENOID. COMPRESSOR IS RESTARTED. EXCESS FLARING DUE TO SHUTDOWN OF LP EXCESS FLARING NECESSARY UNTIL 2ND 12/12016 124250 0290000025 12/42016 - 7:09:00 19:40:00 12/4/2016 U 1,157 COMPRESSOR DUE TO A BAD 2ND STAGE STAGE SOLENOID IS REPLACED AND SOLENOID. COMPRESSOR IS RESTARTED. EXCESS FLARING DUE TO SHUTDOWN OF LP EXCESS FLARING NECESSARY UNTIL 2ND 12/1/2016 124250 0290000025 12/42016 8:45:00 10:16:00 12/4/2016 U 206 COMPRESSOR DUE TO A BAD 2ND STAGE STAGE SOLENOID IS REPLACED AND SOLENOID. COMPRESSOR IS RESTARTED. EXCESS FLARING DUE TO SHUTDOWN OF LP EXCESS FLARING NECESSARY UNTIL 2ND 12/1/2016 124250 0290000025 12/4/2016 15:51:00 18:22:00 12/4/2016 U 349 COMPRESSOR DUE TO A BAD 2ND STAGE STAGE SOLENOID IS REPLACED AND SOLENOID. COMPRESSOR IS RESTARTED. EXCESS FLARING DUE TO SHUTDOWN OF LP EXCESS FLARING NECESSARY UNTIL 2ND 12/1/2016 124250 0290000025 12/5/2016 0:35:00 5:18:00 12/5/2016 U 607 COMPRESSOR DUE TO A BAD 2ND STAGE STAGE SOLENOID IS REPLACED AND SOLENOID. COMPRESSOR IS RESTARTED. EXCESS FLARING DUE TO SHUTDOWN OF LP EXCESS FLARING NECESSARY UNTIL 2ND 12/1/2016 124250 0290000025 12/52016 0:38.00 8:45:00 12/52016 U 877 COMPRESSOR DUE TO A BAD 2ND STAGE STAGE SOLENOID IS REPLACED AND SOLENOID. COMPRESSOR IS RESTARTED, EXCESS FLARING DUE TO SHUTDOWN OF LP EXCESS FLARING NECESSARY UNTIL 2ND 12/1/2016 124250 0290000025 12/5/2016 5:27:00 8:22:00 12/5/2016 U 405 COMPRESSOR DUE TO A BAD 2ND STAGE 'STAGE SOLENOID IS REPLACED AND SOLENOID. 'COMPRESSOR IS RESTARTED. EXCESS FLARING DUE TO LIQUIDS EXCESS FLARING NECESSARY UNTIL LIQUIDS 12/1/2016 124250 0290000025 12/17/2016 19:40:00 23:30:00 12/17/2016 P 645 UNLOADING OF WELL NS -33. UNLOADING COULD BE COMPLETED AND WELLS BROUGHT BACK ONLINE. EXCESS FLARING DUE TO LIQUIDS EXCESS FLARING NECESSARY UNTIL LIQUIDS 12/1/2016 124250 0290000025 12/182016 0:36:00 3:07:00 12/182016 '.. P 461 UNLOADING OF WELL NS -33. UNLOADING COULD BE COMPLETED AND WELLS BROUGHT BACK ONLINE. 5,596