Gas Disposition Files
Year: 2016
Facility: Northstar
Operator: Hilcorp Alaska LLC
STATE OF ALASKA
ALASKA OIL AND GAS CONSERVATION COMMISSION
Name
6. Sold
0
7. Reinjected
18,264,958
8. Flared or vented 1 hour or less
341
9. Flared or vented more than 1 hour (see instr.)
0
10. Pilot and Purge
5,486
11. Assist Gas
0
12. Fuel gas used in lease operations
550,773
13. Other (see instructions)
0
14. TOTAL VOLUME (ITEMS 6-13)
18,821,558
15. NGL Gas Equivalent
0
16. Purchased gas:
383
17. Transferred from: (Off -lease Gas)
0
18. Transferred to:
0
19. Remarks:
Gas purchased from BPXA PBU for fuel at Caribou Crossing 383
Total Volume.
Use
of each pool as a percent of
hereby certify that the foregoin is true and correct to the best of my knowledge.
Note: All volumes must be corrected
Signature Title Production Analyst pressure of 14.65 psia and to a
temperature of 60o F. Authority 20
STATE OF ALASKA
ALASKA OIL AND GAS CONSERVATION COMMISSION
FACILITY REPORT OF PRODUCED GAS DISPOSITION
1. Facility Number 2. Facility Name 3. Field 4. Operator 5. Mont"
rYear of Disposition
0290000025 Northstar Northstar HILCORP ALASKA LLC Februa 2016
Disposition I Volume MCF 1 20. For production from multiple pools, list contribution of each pool as a percent of Total
6. Sold
0
7. Reinjected
17,204,783
8. Flared or vented 1 four or less
498
9. Flared or vented more than 1 hour (see instr.)
0
10. Pilot and Purge
5,132
11. Assist Gas
0
12. Fuel gas used in lease operations
516,005
13. Other (see instructions)
0
14. TOTAL VOLUME (ITEMS 6-13)
17,726,418
15. NGL Gas Equivalent
0
16. Purchased gas:
1,055
17. Transferred from (Off -lease Gas)
0
18. Transferred to:
0
I hereby certify
Gas purchased from BPXA PBU for fuel at Caribou Crossing 1,055
correct to the best of my knowledge.
Title
Pool Name
Use
5901
11%
Note: All volumes must be corrected
pressure of 14.65 psia and to a
temperature of 60o F. Authority 20
1. Facility
Northstar
STATE OF ALASKA
ALASKA OIL AND GAS CONSERVATION COMMISSION
6.
Sold
0
7.
Reinjected
17,204,783
8.
Flared orvented 1 hourorless
498
9.
Flared or vented more than 1 hour (see instr.)
0
10.
Pilot and Purge
5,132
11.
Assist Gas
0
12.
Fuel gas used in lease operations
517,060
13.
Other (see instructions)
0
14.
TOTAL VOLUME (ITEMS 6-13)
17,727,473
15.
NGL Gas Equivalent
0
16.
Purchased gas:
1,055
17.
Transferred from: (Off -lease Gas)
0
18.
Transferred to:
0
19.
Remarks:
Gas purchased from BPXA PBU for fuel at Caribou Crossing
1,055
the foregoing is true
Title
1
>1 hr.
Name
LLC
OIL
Lease Use
Conservation
each pool as a percent
rte: All volumes must be corrected to
pressure of 14.65 psia and to a
temperature of 60o F. Authority 20
STATE OF ALASKA
ALASKA OIL AND GAS CONSERVATION COMMISSION
FACILITY REPORT OF PRODUCED GAS DISPOSITION
1. Facility Number
0290000025
2. Facility Name
1 Northstar
3. Field 4. Operator 5. Month/Year of Disposition
Northstar I HILCORP ALASKA LLC I March 2016
Disposition
Volume MCF
20. For production from multiple pools, list contribution of each pool as a percent of
Total Volume.
6. Sold
0
Pool Name Pool Code Percent
7. Reinjected
18,747,925
NORTHSTAR, NORTHSTAR OIL 590100 91.91
NORTHSTAR, KUPARUK C UNDEF OIL 590150 8.09%
8. Flared or vented 1 hour or less
294
9. Flared or vented more than 1 hour (see instr.)
917
10. Pilot and Purge
5,309
11. Assist Gas
0
12. Fuel gas used in lease operations
556,048
13. Other (see instructions)
0
Official Use Only
Authorization>1 hr:
Safety
cJ��
MCF
14. TOTAL VOLUME (ITEMS 6-13)
19,310,494
Lease Use
MCF
15. NGL Gas Equivalent
p
Conservation
MCF
16. Purchased gas:
1 759
Waste:
MCF
17. Transferred from: (Off -lease Gas)
0
/Y
eC40-4t6a1---9—Date
18. Transferred to:
0
Gas purchased from BPXA PBU for fuel at Caribou Crossing 1,759
certity that the foregoi is true and corr ct o th best of my knowledge.
Note: All volumes must be corrected
Signature a9 rm i Title Production Analyst pressure of 14.65 psta and to a
fad Na.. I uonnn rnfmW— ..1___ -.... ___ __.. _
temperature of 60o F. Authority 20
Northstar
RA.,h_1R
917
3/1/2016
124250
0290000025
3/29/2016
18:30:00
22:00:00
3/29/2016
U
500
FROZEN PRESSURE TRANSMITTER
OPERATIONAL UPSET - RESTART UNIT
3/1/2016
124250
0290000025
3/29/2016
19:57:00
21:19:00
3/29/2016
U
86
FROZEN PRESSURE TRANSMITTER
OPERATIONAL UPSET- RESTART UNIT
3/1/2016
124250
0290000025
3/30/2016
0:14:00
1:55:00
3/30/2016
U
170
UNITSURGE
OPERATIONAL UPSET - RESTART
COMPRESSOR
3/1/2016
124250
0290000025
3/30/2016
0:16:00
1:32:00
3/30/2016
U
161
UNIT SURGE
OPERATIONAL UPSET - RESTART
COMPRESSOR
917
STATE OF ALASKA
ALASKA OIL AND GAS CONSERVATION COMMISSION
FACILITY REPORT OF PRODUCED GAS DISPOSITION
1. Facility Number 2. Facility Name 3. Field 4. Operator 5. Month/Year of Disposition
0290000025 1 Northstar Northstar HILCORP ALASKA LLC d12016
Disposition Volume MCF J 20. For production from multiple pools, list contribution of each pool as a percent of
6. Sold
0
7. Reinjected
16,917,389
8. Flared or vented 1 hour or less
3,097
9. Flared or vented more than 1 hour (see instr.)
370
10. Pilot and Purge
5,309
11. Assist Gas
0
12. Fuel gas used in lease operations
508,498
13. Other (see instructions)
0
14. TOTAL VOLUME (ITEMS 6-13)
17,434,663
15. NGL Gas Equivalent
0
16. Purchased gas:
1,607
17. Transferred from: (Off -lease Gas)
0
18. Transferred to:
0
Gas purchased from BPXA PBU for fuel at Caribou Crossing 1,607
Total Volume.
Use
Date
certify that the foregoing is true and correct to the best of my knowledgei 6..
Note: All volumes must be corrected
Signature //J�J7/Jl� Title Production Anal t pressure of 14.65 psla and to a
temperature of 60o F. Authority 20
V7-7--
411/1—
Northstar
4/1/2016 1 124250 102900000251 4/2/2016RESTART OF THE LP
21:08:00I 23:29:00 I 4/2/2016 I N 1370.0 (COMPRESSOR AFTER PLANT
Total > 1hr: 370.0
NGL PRODUCTION COULD BE CUT
MINIMIZE FLARING.
Number
Facility Name
STATE OF ALASKA
ALASKA OIL AND GAS CONSERVATION COMMISSION
6. Sold
0
7. Reinjected
17,073,473
8. Flared or vented 1 hour or less
111
9. Flared or vented more than 1 hour (see inslr.)
0
10. Pilot and Purge
5,309
11. Assist Gas
0
12. Fuel gas used in lease operations
525,347
13. Other (see instructions)
0
14. TOTAL VOLUME (ITEMS 6-13)
17,604,240
15. NGL Gas Equivalent
0
16. Purchased gas:
1,600
17. Transferred from: (Off -lease Gas)
0
18. Transferred to:
0
19. Remarks
Gas purchased from BPXA PBU for fuel at Caribou Crossing
certify that the foregoing istrueand correct to the best of my knowledge.
Signature --��/ .M..�Z.� - Title
1,600
1
from
Total
Use
each pool as a
Note: All volumes must be corrected to
pressure of 14.65 psis and to a
temperature of 60o F. Authority 20
STATE OF ALASKA
ALASKA OIL AND GAS CONSERVATION COMMISSION
Sold
Reinjected
Flared or vented 1 hour or less
Flared or vented more than i hour (see instr.)
Pilot and Purge
Assist Gas
2,Fuel gas used in lease operations
3. Other (see instructions)
4. TOTAL VOLUME (ITEMS 6-13)
5. NGL Gas Equivalent
S. Purchased gas:
7. Transferred from: (Off -lease Gas)
8. Transferred to:
9. Remarks:
Gas purchased from BPXA PBU for fuel at Caribou Crossing
olume MCF
20. For production from multiple pools, list contribution of each pool as a perces
Total Volume.
0
Pool Name Pool Code Pen
14,785,639
NORTHSTAR, NORTHSTAR OIL 590100 91.1
NORTHSTAR, KUPARUK C UNDEF OIL 590150 8.81
2,336
3,704
5,309
0
459,283
0
Official Use Only
Authorization >l h[
Safety
�Q A_
i
MCF )
15,256,270
Lease Use
MCF
0
Conservation
MCF
1,666
Waste:
MCF
0
Com I si n6— _Y Date
0
1,666
Note: All Volumes must be corrected
Title Production Analyst pressure of 14.65 psia and to a
temperature of 60o F. Authority 20
Northstar
62016 124250 10290000025 6/26/2016 11:06:00 16:16:00 1 6/26/2016 U 2713 PLANTSTARTUP PLANT STARTUP
6/1/2016 124250 0290000025_ 6/26/2016 . 17:07:00 18:38:00 6/26/2016 U 1 991 IPLANTSTARTUP I PLANT STARTUP
3704
Link, Liz M (DOA)
From: Loepp, Victoria T (DOA)
Sent: Thursday, June 23, 2016 9:18 AM
To: Drew Anderson
Cc: AOGCC Reporting (DOA sponsored)
Subject: RE: Planned Maintenance and Flaring at Northstar
Drew
Approval is granted to flare up to 30,000 MCF total volume over up to 5 days for the purpose of the LP Compressor
upgrade.
Thanx,
Victoria
Victoria Loepp
Senior Petroleum Engineer
State of Alaska
Oil & Gas Conservation Commission
333 W. 7th Ave
Anchorage, AK 99501
Work: (907)793-1247
Victoria. LoepmMalaska.gov
CONFIDENTIALITY NOTICE; This e-mail message, including any attachments, contains information from the Alaska Oil and Gas Conservation
Commission (AOGCC), State of Alaska and is for the sole use of the intended recipieni(s). It may contain confidential and/or privileged
information. The unauthorized review, use or disclosure of such information may violate state or federal law. If you are an unintended
recipient of this e-mail, please delete it, without first saving or forwarding it, and, so that the AOGCC is aware of the mistake in sending it to
you, contact Victoria Loepp at (907)793-1247 or Victorio.LoeooCralaska.aov
From: Drew Anderson[mailto:anandersonCalhilcorp.com]
Sent: Friday, June 03, 2016 3:49 PM
To: Loepp, Victoria T (DOA)
Cc: Larry Greenstein; Samantha Porreca - (C)
Subject: Planned Maintenance and Flaring at Northstar
Victoria,
We are planning on performing a controls upgrade to the LP Compressor Unit at Northstar, which will require a
shutdown of the LP Compressor and flaring its gas. Our operations group is estimating 5 days to perform the work on
the compressor with a potential flare of 30,000 MCF during that time. The purpose of this upgrade to the compressor is
to improve reliability and overall runtime, which will result in fewer future flaring events.
To mitigate the flaring event, we are strategically sheltering the compressor work to coincide with 2 other planned
facility shutdowns. During the last week in June, we will be performing our annual Northstar BESD. Also, there is a
planned TAPS outage on June 25". Both of these events are anticipated to take 1.5-2 days total and will also result in
flaring. By advantageously scheduling all three events to occur simultaneously, we are reducing the overall flaring by
23%-33%.
For reference, Northstar was shutdown for approximately 13 hours for last year's BESD and flared 3200 MCF.
During these operations, we will take steps to minimize flaring where possible and all flaring data will be captured in our
monthly 10-422 and excess flare log.
Please let me know if you have any questions.
Thank you,
Drew
Drew Anderson, PE PMP I Environmental Specialist
=ClHilcorp Alaska, LLC
anander,son@hilcorp.com
P (907)777-84881 F (907)777-8560 1 M (907)382-0987
STATE OF ALASKA
ALASKA OIL AND GAS CONSERVATION COMMISSION
6.
Sold
12. Fuel gas used in lease operations
0
7.
Reinjected
14. TOTAL VOLUME (ITEMS 6.13)
10,835,010
8.
Flared or vented 1 hour or less
16. Purchased gas:
3,743
9.
Flared or vented more than 1 hour (see instr.)
18. Transferred to:
0
10.
Pilot and Purge
5,486
11. Assist Gas
0
12. Fuel gas used in lease operations
384,536
13. Other (see instructions)
0
14. TOTAL VOLUME (ITEMS 6.13)
11,228,775
15. NGL Gas Equivalent
0
16. Purchased gas:
1,879
17. Transferred from: (Off -lease Gas)
0
18. Transferred to:
0
19. Remarks:
Gas purchased from BPXA PBU for fuel at Caribou Crossing 1,879
production from
>1
Use
of each pool as a
87
��'"Y^_• •��_ ���=y����y oe anu wireGl I e URI dT my Knowledge.
Note: All volumes must be corrected
Signature Title Production Analyst pressure of 14.65 psia and to a
_ _ _ ___ __ temperature of 60o F. Authority 20
IPtl Name I Penna 1Alawine ... _ _ ... .. _
STATE OF ALASKA
ALASKA OIL AND GAS CONSERVATION COMMISSION
FACILITY REPORT OF PRODUCED GAS DISPOSITION
1. Facility Number
0290000025
2. Facility Name
Northstar
3. Field 4.Operator
Nonhstar HILCORP ALASKA LLC
5. Month/Year of Disposition
August 2016
Disposition
Volume MCF
20. For production from multiple pools, list contribution of each pool as a percent of
Total Volume.
a%
S. Sold
0
Pool Name Pool Code Percent
7. Reinjected
15,791,191
NORTHSTAR, NORTHSTAR OIL 590100 88.72%
NORTHSTAR, KUPARUK C UNDEF OIL 590150 11.28%
B. Flared or vented 1 hour or less
2,946
9. Flared or vented more than 1 hour (see instr.)
2,741
10. Pilot and Purge
5,486
11. Assist Gas
0
12. Fuel gas used in lease operations
495,701
13. Other (see instructions)
0
Official Use Only
Authorization >1 hr:
Safety
MCF
14. TOTAL VOLUME (ITEMS 6.13)
16,298,065
Lease Use
MCF
15. NGL Gas Equivalent
0
ConservationI
�7#1
MCF
lb/b
16. Purchased gas:
1,979
Waste:
MCF
17. Transferred from: (Off -lease Gas)
0
10-12 —16
/ Commissioner -- Date
18. Transferred to:
0
Gas purchased from BPXA PBU for fuel at Caribou Crossing 1,979
true and
Signature
my
Note: All volumes must be corrected
pressure of 14.65 psia and to a
temperature of 60o F. Authority 20
AOGCC Excess Flare Report
August -2016
NORTHSTAR — NSU GATHERING
�;
-
Ending
RPtW F'
OpNo
FacOByNo
Dateftaied
StartTime
Time
End Date
Planned
MCF Description of Flaring Event
Action Taken to Minimize VOID,..
8/1/2016
124250
0290000025
8/12/2016
25300
3:58:00
8/12/2016
P
153 EXCESS FLARING DUE TO LIQUIDS
UNLOADING OF WELL NS -18 BROUGHT ON
EXCESS FLARING NECESSARY UNTIL LIQUIDS
UNLOADING COULD BE COMPLETE.
EXCESS FLARING DUE TO LIQUIDS
EXCESS FLARING NECESSARY WHILE TRYING
8/1/2016
124250
0290000025
8/13/2016
12:18:00
22:39:00
8113/2016
U
1,301 UNLOADING OF WELL NS -18 BROUGHT ON
TO UNLOAD LIQUIDS INTO THE TEST
INTO TEST SEPARATOR.
SEPARATOR.
EXCESS FLARING DUE TO LIQUIDS
EXCESS FLARING NECESSARY UNTIL LIQUIDS
8/1/2016
124250
0290000025
8/28/2016
4:53:00
10:52:00
8/28/2016
U
1,287 UNLOADING OF WELL N -33A.
UNLOADING COULD BE COMPLETE AND WELL
BROUGHT BACK ONLINE.
2,741
STATE OF ALASKA
ALASKA OIL AND GAS CONSERVATION COMMISSION
FACILITY REPORT OF PRODUCED GAS DISPOSITION
1. Facility Number 2. Facility Name 3. Field 4. Operator 5. Month/Year of Disposition
0290000025 Northstar Northstar HILCORP ALASKA LLC Se tember 2018
Disposition Volume MCF 20. For production from multiple pools, list contribution of each pool as a percent of
6. Sold
0
7. Reinjected
15,536,610
8. Flared or vented 1 hour or less
20
9. Flared or vented more than 1 hour (see instr.)
1,876
10. Pilot and Purge
5,309
11. Assist Gas
0
12. Fuel gas used in lease operations
482,558
13. Other (see instructions)
0
14. TOTAL VOLUME (ITEMS 6-13)
16,026,373
15. NGL Gas Equivalent
0
16. Purchased gas:
8
17. Transferred from: (Off -lease Gas)
0
18. Transferred to:
0
19. Remarks
Gas purchased from BPXA PBU for fuel at Caribou Crossing 8
hereby certify that the foregoing is true and correct
Total Volume.
Pool Name Pool Code Percent
NORTHSTAR, NORTHSTAR OIL 590100 88 33%
Use
/8
10-Z6 -/(
Note: All volumes must be corrected
Signature ioninr %md Title Production Analyst pressure of 14.65 psia and to a
temperature of 60o F. Authority 20
Ending
RptDate OpNo FacilityNo Date Flared StartTime Time
9/1/2016 124250 0290000025 9/24/2016 716.00 15.19:00
AOGCC Excess Flare Report
September -2016
NORTHSTAR — NSU GATHERING
End Date Planned MCl=1.,1 wp—
EXCESS FLARING DUE TO LIQUIDS
9/24/2016 U 1,876 UNLOADING OF WELL NS -33, THIS WAS A
PERMITTED FLARING EVENT.
1,876
EXCESS FLARING NECESSARY UNTIL LIQUIDS
UNLOADING COULD BE COMPLETE AND WELL
BROUGHT BACK ONLINE.
and
Signature
Title
1
of Dispositior
er 2016
as a percent
Z-�53
2-!(m -(
z 1114 ) p -
-
Note: All volumes must be corrected to
pressure of 14.65 psis and to a
temperature of 60o F. Authority 20
STATE OF ALASKA
ALASKA OIL AND GAS CONSERVATION COMMISSION
FACILITY REPORT OF PRODUCED GAS DISPOSITION
1. Facility Number
0290000025
2. Facility Name
Northstar
3. Field 4.0perator
Northstar HILCORP ALASKA LLC
Disposition
Volume MCF
20. For production from multiple pools, list o
Total Volu
6. Sold
0
Pool Name
7. Reinjected
14,428,158
NORTHSTAR, NORTHSTAR OIL
NORTHSTAR, KUPARUK C UNDEF OIL
8. Flared or vented 1 hour or less
929
9. Flared or vented more than 1 hour (see instr.)
2,753
10. Pilot and Purge
5,486
11. Assist Gas
0
12. Fuel gas used in lease operations
465,286
13. Other (see instructions)
0
Official Use
Authorization >1 hr:
Safety
14. TOTAL VOLUME (ITEMS 6-13)
14,902,611
Lease Use
15. NGL Gas Equivalent
0
Conservation
16. Purchased gas:
755
Waste:
17. Transferred from: (Off -lease Gas)
0
PLO
omZ missione" r
18. Transferred to:
0
19. Remarks:
Gas purchased from BPXA PBU for fuel at Caribou Crossing
755
and
Signature
Title
1
of Dispositior
er 2016
as a percent
Z-�53
2-!(m -(
z 1114 ) p -
-
Note: All volumes must be corrected to
pressure of 14.65 psis and to a
temperature of 60o F. Authority 20
m��
10/1/2016
124250
0290000025
10/21/2016
3:43:00
EXCESS FLARING NECESSARY UNTIL
10/112016
124250
0290000025
10/21/2016
3:49:00
UNLOADED AND WELL BROUGHT BACK
10/1/2016
124250
0290000025
10/25/2016
1:42:00
AOGCC Excess Flare Report
October -2016
NORTHSTAR — NSU GATHERING
5:13:00 10/21/2016 U 338 EXCESS FLARING DUE TO SHUTDOWN OF HP
EXCESS FLARING NECESSARY UNTIL
FLARE A FOR MAINTENANCE.
MAINTENANCE COMPLETE.
6:23:00 10/21/2016 U 1,868 EXCESS FLARING DUE TO SHUTDOWN OF HP
EXCESS FLARING NECESSARY UNTIL
FLARE A FOR MAINTENANCE.
MAINTENANCE COMPLETE.
EXCESS FLARING DUE TO LIQUIDS
EXCESS FLARING NECESSARY UNTIL LIQUIDS
4:08:00 10/25/2016 U 546 UNLOADING OF WELL NS -33.
UNLOADED AND WELL BROUGHT BACK
ONLINE.
2,753
STATE OF ALASKA
ALASKA OIL AND GAS CONSERVATION COMMISSION
Facility Number
6. Sold
0
7. Reinjected
15,105,088
8. Flared or vented 1 hour or less
1,904
9. Flared or vented more than 1 hour (see instr.)
3,020
10. Pilot and Purge
5,309
11. Assist Gas
0
12. Fuel gas used in lease operations
470,373
13. Other (see instructions)
0
14. TOTAL VOLUME (ITEMS 6-13)
15,585,694
15. NGL Gas Equivalent
0
16. Purchased gas:
3,206
17. Transferred from: (Off -lease Gas)
0
18. Transferred to:
o
Gas purchased from BPXA PBU for fuel at Caribou Crossing
and correct to the best of my knowledge.
Signature
3,206
Title
3-757-5211
20.
>1 hr
Total Volume.
Use
as a
Percent
62,0
5-17-16
,te: All volumes must be corrected to
pressure of 14.65 psis and to a
temperature of 60o F. Authority 20
AOGCC Excess Flare Report
November-2016
NORTHSTAR — NSU GATHERING
RptDate
OpNo
FacilityNo Date Flared Start Time
Ending
Time
End Date Planned MCF Description of Flaring Event
Action Taken to Minimize Volum
EXCESS FLARING DUE TO STARTUP OF HP-8
EXCESS FLARING NECESSARY UNTIL A
11/1/2016
124250
0290000025 11/5/2016 8:01:00
10:17:0011!5/2016
U 1 262 AFTER MECHANICAL REPAIR AFTER HP-N
TURBINE SHUTDOWN.
COMPLETE OVERHAUL OF HP-B TURBINE IS
'..CONDUCTED AND TURBINE BROUGHT BACK
.ONLINE.
EXCESS FLARING DUE TO LIQUIDS
EXCESS FLARING NECESSARY TILL LIQUIDS
11/1/2016
124250
0290000025 11/18/2016 7:34:00
15:06:00
11/18/2016 U 1,758 UNLOADING OF WELL NS-33A,
UNLOADING COMPLETE AND WELL BROUGHT
BACK ONLINE.
3,020
is true
Signature
my
Date
multiple pools,
Total
C
Use
each pool as a
MUF
MCF,5/4� �� •
MCF
MCF
3 -2D -I]
As: All volumes must be corrected
pressure of 14.65 psis and to a
temperature of 600 F. Authority 20
STATE OF ALASKA
ALASKA OIL AND GAS CONSERVATION COMMISSION
FACILITY REPORT OF PRODUCED GAS DISPOSITION
1.
Facility Number
0290000025
2. Facility Name
Northstar
3. Field q
Northstar
Disposition
Volume MCF
1 20. For prodw
6.
Sold
0
7.
Reinjected
18,218,592
NORTHSI
NORTHSTAR
8.
Flared or vented 1 hour or less
618
9.
Flared or vented more than 1 hour (see instr.)
5,596
10.
Pilot and Purge
5,486
11. Assist Gas
0
12. Fuel gas used in lease operations
539,251
13.
Other (see instructions)
0
Authorization >1
14.
TOTAL VOLUME (ITEMS 6-13)
18,769,543
15.
NGL Gas Equivalent
0
16.
Purchased gas:
3,536
Waste:
17.
Transferred from: (Off -lease Gas)
0
18.
Transferred to:
0
19.
Remarks:
Line 16 Gas purchased from BPYA PBU for fuel at Caribou Crossing 3,536
is true
Signature
my
Date
multiple pools,
Total
C
Use
each pool as a
MUF
MCF,5/4� �� •
MCF
MCF
3 -2D -I]
As: All volumes must be corrected
pressure of 14.65 psis and to a
temperature of 600 F. Authority 20
AOGCC Excess Flare Report
December -2016
NORTHSTAR — NSU GATHERING
Ending
RptDate OpNo FacilityNo Date Flared Start Time Time End Date Planned MCF
EXCESS FLARING DUE TO SHUTDOWN OF LP 'EXCESS FLARING NECESSARY UNTIL 2ND
12/1/2016 124250 0290000025 12/3/2016 18:10:00 2224.00 12/3/2016 U 416 COMPRESSOR DUE TO A BAD 2ND STAGE STAGE SOLENOID IS REPLACED AND
SOLENOID. ,COMPRESSOR IS RESTARTED.
EXCESS FLARING DUE TO SHUTDOWN OF LP EXCESS FLARING NECESSARY UNTIL 2ND
12/1/2016 124250 0290000025 12/3/2016 19:19:00 20:37:00 12/3/2016 U 93 COMPRESSOR DUE TO A BAD 2ND STAGE STAGE SOLENOID IS REPLACED AND
SOLENOID. COMPRESSOR IS RESTARTED.
EXCESS FLARING DUE TO SHUTDOWN OF LP EXCESS FLARING NECESSARY UNTIL 2ND
12/1/2016 124250 0290000025 12/42016 1:12:00 7:01:00 12/4/2016 U 380 COMPRESSOR DUE TO A BAD 2ND STAGE STAGE SOLENOID IS REPLACED AND
SOLENOID. COMPRESSOR IS RESTARTED.
EXCESS FLARING DUE TO SHUTDOWN OF LP EXCESS FLARING NECESSARY UNTIL 2ND
12/12016 124250 0290000025 12/42016 - 7:09:00 19:40:00 12/4/2016 U 1,157 COMPRESSOR DUE TO A BAD 2ND STAGE STAGE SOLENOID IS REPLACED AND
SOLENOID. COMPRESSOR IS RESTARTED.
EXCESS FLARING DUE TO SHUTDOWN OF LP EXCESS FLARING NECESSARY UNTIL 2ND
12/1/2016 124250 0290000025 12/42016 8:45:00 10:16:00 12/4/2016 U 206 COMPRESSOR DUE TO A BAD 2ND STAGE STAGE SOLENOID IS REPLACED AND
SOLENOID. COMPRESSOR IS RESTARTED.
EXCESS FLARING DUE TO SHUTDOWN OF LP EXCESS FLARING NECESSARY UNTIL 2ND
12/1/2016 124250 0290000025 12/4/2016 15:51:00 18:22:00 12/4/2016 U 349 COMPRESSOR DUE TO A BAD 2ND STAGE STAGE SOLENOID IS REPLACED AND
SOLENOID. COMPRESSOR IS RESTARTED.
EXCESS FLARING DUE TO SHUTDOWN OF LP EXCESS FLARING NECESSARY UNTIL 2ND
12/1/2016 124250 0290000025 12/5/2016 0:35:00 5:18:00 12/5/2016 U 607 COMPRESSOR DUE TO A BAD 2ND STAGE STAGE SOLENOID IS REPLACED AND
SOLENOID. COMPRESSOR IS RESTARTED.
EXCESS FLARING DUE TO SHUTDOWN OF LP EXCESS FLARING NECESSARY UNTIL 2ND
12/1/2016 124250 0290000025 12/52016 0:38.00 8:45:00 12/52016 U 877 COMPRESSOR DUE TO A BAD 2ND STAGE STAGE SOLENOID IS REPLACED AND
SOLENOID. COMPRESSOR IS RESTARTED,
EXCESS FLARING DUE TO SHUTDOWN OF LP EXCESS FLARING NECESSARY UNTIL 2ND
12/1/2016 124250 0290000025 12/5/2016 5:27:00 8:22:00 12/5/2016 U 405 COMPRESSOR DUE TO A BAD 2ND STAGE 'STAGE SOLENOID IS REPLACED AND
SOLENOID. 'COMPRESSOR IS RESTARTED.
EXCESS FLARING DUE TO LIQUIDS EXCESS FLARING NECESSARY UNTIL LIQUIDS
12/1/2016 124250 0290000025 12/17/2016 19:40:00 23:30:00 12/17/2016 P 645 UNLOADING OF WELL NS -33. UNLOADING COULD BE COMPLETED AND
WELLS BROUGHT BACK ONLINE.
EXCESS FLARING DUE TO LIQUIDS EXCESS FLARING NECESSARY UNTIL LIQUIDS
12/1/2016 124250 0290000025 12/182016 0:36:00 3:07:00 12/182016 '.. P 461 UNLOADING OF WELL NS -33. UNLOADING COULD BE COMPLETED AND
WELLS BROUGHT BACK ONLINE.
5,596