Alaska Logo
Department of Commerce, Community, and Economic Development
Alaska Oil and Gas Conservation
Commission
Loading...
HomeMy WebLinkAboutPBU CCP-FFGU - BP Exploration (Alaska) Inc.State of Alaska AOGCC Gas Disposition Files Year: 2016 Facility: PBU CCP/FFGU Operator: BP Exploration (Alaska) Inc. STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMMISSION FACILITY REPORT OF PRODUCM GAS ni-qpncrrinti 1, Facility Number 2. Facility Name 0290000000 PB CCP/FFGU Disposition 3. Field PBU - EOA Volume MCF 4. Operator ' ... v • • • v, 5 MonthNear of Disposition BP I Janua -2016 20. For production from multiple pools, list contribution of each pool as a percent of Total Volume. 6. Sold 952,954 Pool Name Pool Code Percent 7. Reinjected 218,488,636 PRUDHOE 640150 100.00% 8. Flared or vented 1 hour or less 534 9. Flared or vented more than 1 hour (see instr.) 0 10. Pilot and Purge 34,621 11. Assist Gas 0 12. Fuel gas used in lease operations. 61178,084 13. Other (see instructions) Official Use Only Authorization >1 hr: Safety MCF 74. TOTAL VOLUME (ITEMS 6-12) 225,654,829 Lease Use MCF 15. NGL Gas Equivalent 0 Conservation MCF 16. Purchased gas 0 Waste: MCF 17. Transferred from: CGF & FSI 225,654,829 18. Transferred to: (Express as a negative #) Commissioner Date 19. Remarks: Block 6: Includes Gas Sales to Alyeska Pipeline, Norgasco, Northstar and KRU. Block 12: Includes COTP Non-PBU Fuel Gas = 810 mscf, Block 18: Fuel Gas to LPC = 0 mscf I hereby certify that the foregoing is true and correct to the best of my knowledge. ���nM4 Note: All volumes must be corrected Signature Title Manager Production Taxes and Royalties Alaska to pressure of 14.65 psis and to a temperature of 60o F. Authority 20 Printed Name Diane Colley Phone (907) 564-5775 Date AAC25.235. Form 10-422 Rev. 5/2009 INSTRUCTIONS ON REVERSE SIDE Submit in Duplicate TOTAL 0 BP EXPLORATION (ALASKA) INC. PRUDHOE BAY UNIT -CENTRAL COMPRESSOR PLANT GAS FLARING INCIDENT REPORT January 2016 Not required for unplanned events <= 1 hr See attachments Not required for unplanned events <= 1 hr See attachments Planned Events Exceeding 1 Hour OR > 5,000 mcf TOTAL 0 See attachments See attachments Planned Events Less Than or Equal 1 Hour AND <= 5,000 mcf DATE TIME VOLUME DESCRIPTION OF INCIDENT & CAUSE ACTION TAKEN TO ELIMINATE CAUSE 1/3/2016 1025-1030 152 See attachments See attachments 1/19/2016 2150-2233 340 1/20/2016 2215-2227 21 1/21/2016 2106-2115 21 34,621 TOTAL 534 Planned Events Exceeding 1 Hour OR > 5,000 mcf DATE TIME VOLUME DESCRIPTION OF INCIDENT & CAUSE ACTION TAKEN TO ELIMINATE CAUSE See attachments See attachments TOTAL 0 TOTAL Unplanned Events < 1 Hour 0 Unplanned Events> 1 Hour 0 Planned Events < 1 hour and not 534 exceeding 5,000 MCF Planned Events> 1 hour or 0 exceeding 5,000 MCF Pilot Purge 34,621 Assist 0 TOTAL FLARED VOLUME 35,155 Page 1 2/12/2016 2:27 PM STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMMISSION FACILITY REPORT OF PRODUCED GAS DISPOSITION 1. Facility Number 0290000000 2. Facility Name PBU CCPtFFGU 3. Field PBU - EOA 4. Operator BP 5. Monthfyear of Disposition I February -2016 Disposition Volume MCF 20. Forproduction from multiple pools, list contribution of each pool as a percent of Total Volume. 6. Sold 675,226 Pool Name Pool Code Percent 7. Reinjected 196,794,809 PRUDHOE 640150 100.00% 8. Flared or vented I hour or law 1,316 9. Flared or vented more than 1 hour (see instr.) 0 10. Pilot and Purge 32,365 11. Assist Gas 0 12. Fuel gas used in lease operations. 5,709,988 13. Other (see instructions) OMcial Use Onlyctions) Authorization >1 hr: Safety MCF 14, TOTAL VOLUME (ITEMS 6-12) 203,213,704 Lease Use MCF 15. NGL Gas Equivalent 0 Conservation MCF 16. Purchased gas 0 Wasle: MCF 17. Transferred from: CGF & FS1 203,213,704 Commissioner Date 18. Transferred to: (Express as a negative #) 0 19. Remarks: Block 6: Includes Gas Sales to Alyeska Pipeline, Norgasco, Northstar and KRU; Block 12: Includes COTP Non-PBU Fuel Gas = 1,096 mscf; Block 18: Fuel Gas to LPC = 0 mscf I hereby certify that the (foregoing is true and correct to the best of my knowledge. I/il/Ytn �0/In, . Note: All Volumes must be corrected Signature d�7� �CC/1(l Title Manager Production Taxes and Royalties Alaska to pressure of 14.65 psis and to a / temperature of 60o F. Authority 20 Printed Name Diane Colley Phone(907)564 -5775 Date / AAC25.235. Form 10-422 Rev. 5/2009 INSTRUCTIONS ON REVERSE SIDE Submit in Duplicate BP EXPLORATION (ALASKA) INC. PRUDHOE BAY UNIT - CENTRAL COMPRESSOR PLANT GAS FLARING INCIDENT REPORT February 2016 2/16/2016 0805-0810 156 Not required for unplanned events <= 1 hr TOTAL 156 See attachments TOTAL 0 2/16/2016 1100-1105 11 See attachments 2/16/2016 1615-1620 141 2/18/2026 1100-1105 77 2/18/2026 1543-1548 156 2/18/2026 1755-1800 8 2/18/2026 1923-1928 3 2/20/2016 0020-0025 77 2/20/2016 0244-0249 77 2/20/2016 0323-0328 77 2/20/2016 0512-0517 156 2/20/2016 0817-0822 11 2/21/2016 0332-0337 77 2/21/2016 0735-0740 156 2/21/2016 1003-1008 11 2/21/2016 1845-1850 45 2/23/2016 2123-2128 77 TOTAL 1,160 Not required for unplanned events <= 1 hr See attachments See attachments Page 1 3111/2016 3:27 PM BP EXPLORATION (ALASKA) INC. PRUDHOE BAY UNIT- CENTRAL COMPRESSOR PLANT GAS FLARING INCIDENT REPORT February 2016 See attachments See attachments TOTAL Page 2 3/11/2016 3:27 PM TOTAL Unplanned Events < 1 Hour 156 Unplanned Events> 1 Hour 0 Planned Events< 1 hour and not 1,160 exceeding 5,000 MCF Planned Events> 1 hour or 0 exceeding 5,000 MCF Pilot Purge 32,365 Assist 0 TOTAL FLARED VOLUME 33,681 Page 2 3/11/2016 3:27 PM STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMMISSION FACILITY REPORT OF PRODUCED GAS DISPOSITION 1. Facility Number 0290000000 2. Facility Name PBU CCP/FFGU 3. Field PBU - EOA 4. Operator BP 5. Month/Year of Disposition I March -2016 Disposition Volume MCF 20. Forproduction from multiple pools, list contribution of each pool as a percent of Total Volume. 6. Sold 714,271 Pool Name Pool Code Percent 7. Reinjected 213,367,987 PRUDHOE 640150 100.00% 8. Flared or vented 1 hour or less 1,785 9. Flared or vented more than 1 hour (see instr.) 0 10. Pilot and Purge 32,658 11. Assist Gas 0 12. Fuel gas used in lease operations. 6,198,681 13. Other (see instructions) 0 Official Use Only Authorization>1 hr: Safety MCF 14. TOTAL VOLUME (ITEMS 6.12) 220,315,382 Lease Use MCF 15. NGL Gas Equivalent 0 Conservation MCF 16. Purchased gas 0 Waste: MCF 17. Transferred from: CGF & FSI 220,315,382 Commissioner Date 78. Transferred to: (Express as a negative #) 0 19. Remarks: Block 6: Includes Gas Sales to Alyeska Pipeline, Norgasco, Northstar and KRU; Block 12: Includes COTP Non-PBU Fuel Gas = 1,928 mscf; Block 18: Fuel Gas to LPC = 0 mscf I hereby certify that the foregoing is true and correct to the best of my knoviledge. I/1� Note: All volumes must be corrected _ `� Signature e-�N1,ry� Title Manager Production Taxes and Royalties Alaska to pressure of 14.65 psia and to a (�, temperature of 60o F. Authority 20 Printed Name Diane Colley Phone (907) 564-5775 Date l [� AAC25.235. Form 10-422 Rev. 5/2009 INSTRUCTIONS ON REVERSE SIDE Submit in Duplicate BP EXPLORATION (ALASKA) INC. PRUDHOE BAY UNIT- CENTRAL COMPRESSOR PLANT GAS FLARING INCIDENT REPORT March 2016 junplanned events less than or equal to 1 hour DATE TIME VOLUME DESCRIPTIO N Of INCIDENT $CAUSE ACTION TAKEN TO ELIMINATE CAUSE 3/11/2016 1400-1420 1,785 Not required for unplanned events <= 1 hr Not required for unplanned events <= 1 hr TOTAL 1,785 See attachments TOTAL 0 Planned events less than or eaual to 1 hour See attachments TOTAL 0 See attachments TOTAL 0 See attachments See attachments See attachments Page 1 4/14/2016 1:52 PM TOTAL Unplanned Events < 1 Hour 1,785 Unplanned Events> 1 Hour 0 Planned Events < 1 hour and not 0 exceeding 5,000 MCF Planned Events > 1 hour or 0 exceeding 5,000 MCF Pilot Purge 32,658 Assist 0 TOTAL FLARED VOLUME 34,443 See attachments See attachments See attachments Page 1 4/14/2016 1:52 PM STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMMISSION FACILITY REPORT OF PRODUCED GAS DISPOSITION 1. Facility Number 0290000000 2. Facility Name PBU CCPIFFGU 3. Field PBU - EOA 4. Operator BP 5. MonthNear of Disposition Aril -2016 Disposition Volume MCF 20. For production from multiple pools, list contribution of each pool as a percent of Total Volume. 6. Sold 570,720 Pool Name Pool Code Percent 7. Reinjected 171,879,809 PRUDHOE 640150 100.00% 8. Flared or vented 1 hour or less 16,188 9. Flared or vented more than 1 hour (see instr.) 0 10. Pilot and Purge 33,371 11. Assist Gas 0 12. Fuel gas used in lease operations. 4,936,906 13. Other (see instructions) 72 Use Onlyctions) Authorization >1 hr: Safety MCF 14. TOTAL VOLUME (ITEMS 6-12) 177,437,066 Lease Use MCF 15. NGL Gas Equivalent 0 Conservation MCF 16. Purchased gas Waste: MCF 17. Transferred from: CGF & FS1 177,437,066 18. Transferred to: (Express as a negative #) 0 Commissioner Date 19. Remarks: Block 6: Includes Gas Sales to Alyeska Pipeline, Norgasco, Northstar and KRU; Block 12: Includes COTP Non-PBU Fuel Gas = 2,746 mscf; Block 18: Fuel Gas to LPC = 72 mscf I hereby certify that the foregoing is We and correct to the best of my knowledge. p )�ny)n Note: All volumes must is corrected Signature l! L�/f �C Title Maria er Production Taxes and Ro allies Alaska t0 pressure Of 14.65 psis and to a temperature of 60o F. Authority 20 Printed Name Diane Colley AAC25.235. Form 10-422 Rev. 512009 INSTRUCTIONS ON REVERSE SIDE Submit in Duplicate BP EXPLORATION (ALASKA) INC. Page 1 PRUDHOE BAY UNIT - CENTRAL COMPRESSOR PLANT GAS FLARING INCIDENT REPORT April 2016 Unplanned events less than or equal to 1 hour —� DATE TIME VOLUME DESCRIPTION OF INCIDENT & CAUSE ACTION TAKEN TO ELIMINATE CAUSE 4/10/2016 1307-1312 408 Not required for unplanned events <= 1 hr Not required for unplanned events <= 1 hr 4/24/2016 0005-0010 5,739 4/24/2016 0635-0640 135 4/24/2016 0636-0641 135 4/24/2016 0637-0642 156 4/24/2016 0638-0643 156 4/24/2016 0639-0644 156 4/24/2016 0640-0645 408 4/24/2016 2245-2250 135 4/25/2016 0100-0105 3,510 4/25/2016 0110-0115 141 4/25/2016 0111-0116 141 4/25/2016 0112-0117 141 4/25/2016 0113-0118 135 4/25/2016 0114-0119 141 4/25/2016 0115-0120 141 4/25/2016 0116-0121 156 4/25/2016 0117-0122 159 4/25/2016 0118-0123 159 4/25/2016 0119-0124 159 4/25/2016 0120-0125 141 4/25/2016 1340-1345 135 4/25/2016 1407-1412 135 4/30/2016 0100-0105 152 TOTAL 12,974 Unplanned events greater than 1 hour DATE TIME DESCRIPTION OF INCIDENT & CAUSE ACTION TAKEN TO ELIMINATE CAUSE See attachments See attachments TOTAL 0 5/16/2016 3:44 PM BP EXPLORATION (ALASKA) INC. PRUDHOE BAY UNIT- CENTRAL COMPRESSOR PLANT GAS FLARING INCIDENT REPORT April 2016 Page 2 Planned events less than or equal to 1 hour DATE TIME VOLUME DESCRIPTION OF INCIDENT & CAUSE ACTION TAKEN TO ELIMINATE CAUSE 4/1/2016 1752-1757 420 See attachments See attachments 4/5/2016 1715-1720 241 4/6/2016 0210-0215 121 4/8/2016 1550-1555 109 4/20/2016 0508-0513 4 4/21/2016 0020-0025 135 4/21/2016 0222-0227 8 4/21/2016 1727-1732 135 4/21/2016 1949-1954 14 4/23/2016 0717-0722 135 4/23/2016 0838-0843 45 4/23/2016 0852-0857 45 4/23/2016 1249-1254 135 4/23/2016 1509-1514 8 4/23/2016 2251-2256 8 4/24/2016 0015-0020 8 4/24/2016 0040-0045 8 4/24/2016 0224-0229 135 4/24/2016 0423-0428 14 4/24/2016 2123-2128 8 4/27/2016 1635-1640 1,433 4/30/2016 1155-1200 45 TOTAL 3,214 5/16/2016 3:44 PM BP EXPLORATION (ALASKA) INC. PRUDHOE BAY UNIT - CENTRAL COMPRESSOR PLANT GAS FLARING INCIDENT REPORT April 2016 Planned events greater than 1 hour DATE TIME VOLUME DESCRIPTION OF INCIDENT & CAUSE ACTION TAKEN TO ELIMINATE CAUSE See attachments See attachments TOTAL 0 Page 3 5/16/2016 3:44 PM TOTAL Unplanned Events < 1 Hour 12,974 Unplanned Events> 1 Hour 0 Planned Events < 1 hour and not 3,214 exceeding 5,000 MCF Planned Events > 1 hour or 0 exceeding 5,000 MCF Pilot Purge 33,371 Assist 0 TOTAL FLARED VOLUME 49,559 Page 3 5/16/2016 3:44 PM Link, Liz M (DOA) From: AK, OPS PCC EOC TL <AKOPSPCCEOCTL@bp.com> Sent: Sunday, May 15, 2016 12:39 PM To: AOGCC Reporting (DOA sponsored) Cc: Loepp, Victoria T (DOA); Benson, Gary A; Arthur, Gregory; AK, OPS CCP CGF OSM; Fortenberry, Christopher; AK, OPS GC3&PCC OSM; AK, HSSEE Env Adv Central; Glover, Robin; AK, OPS CCP OTL; Kain, Rachel B Subject: Gas flaring event at CCP To: AOGCC Reporting CC: Victoria Leopp, AOGCC Aogcc.reportlnq(a7alaska.goy victoria.loeop a()alaska.gov From: Jennifer Blake, GPB Production Optimization Team Leader A flaring event occurred at CCP starting at 04/24/2016 00:05 and stopping at 04/24/2016 00:10 with a volume of 5739 (MSCF) and was due to the CCP Plant Operational Flare (P37 -AV) opening due to the power outage. The event stopped when the flare valve closed. Thanks, Jennifer Blake PCC/EOC Production Optimization Team Lead (alt David Spall) Office (907) 659-4472 Cell (907) 830-6204 Jennifer.blake@bp.com STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMMISSION FACILITY REPORT OF PRODUCED GAS DISPOSITION 1. Facility Number 0290000000 2. Facility Name PBU CCP/FFGU 3. Field PBU - EOA 4. Operator BP 5. MonthNear of Disposition May -2016 Disposition Volume MCF 20. For production from multiple pools, list contribution of each pool as a percent of Total Volume. 6. Sold 688,720 Pool Name Pool Code Percent 7. Reinjected 194,604,642 PRUDHOE 640150 100.00% 8. Flared or vented l hour or less 1,041 9. Flared or vented more than 1 hour (see instr.) 0 10. Pilot and Purge 34,833 11. Assist Gas 0 12. Fuel gas used in lease operations. 5,450,034 13. Other (see instructions) 0 Official Use Only Authorization >1 hr: Safety MCF 14. TOTAL VOLUME (ITEMS 6.12) 200,779,470 Lease Use MCF 15. NGL Gas Equivalent 0 Conservation MCF 16. Purchased gas 0 Waste: MCF 17. Transferred from: CGF & FS1 200,779,470 Commissioner Date 18. Transferred to: (Express as a negative #) O1 19. Remarks: Block 6: Includes Gas Sales to Alyeska Pipeline, Norgasco, Northstar and KRU; Block 12: Includes COTP Non-PBU Fuel Gas = 2,762 mscf; Block 18: Fuel Gas to LPC = 0 mscf I hereby certify that the foregoing is true and correct to the best of my knowledge. �,/J/fj�» Note: All volumes must be corrected Signature AGt LGG�I Title Manager Production Taxes and Royalties Alaska to pressure of 14.65 psis and to a G temperature of 60o F. Authority 20 Printed Name Diane Colley Phone (907) 564-5775 Date AAC25.235. Form 10422 Rev. 512009 INSTRUCTIONS ON REVERSE SIDE Submit in Duplicate BP EXPLORATION (ALASKA) INC. PRUDHOE BAY UNIT- CENTRAL COMPRESSOR PLANT GAS FLARING INCIDENT REPORT May 2016 events less than or eaual to 1 Not required for unplanned events <= 1 hr TOTAL 0 events greater than 1 hour Not required for unplanned events <= 1 hr See attachments TOTAL 0 See attachments Page 1 6/15/2016 2:44 PM TOTAL See attachments See attachments 0 Planned events less than or, equal to 1 hour DATE TIME VOLUME - DESCRIPTION OF INCIDENT & CAUSE ACTION TAKEN TO ELIMINATE CAUSE 5/2/2016 1701-1706 45 See attachments See attachments 5/2/2016 1819-1827 8 5/3/2016 0836-0841 135 5/3/2016 1047-1052 45 5/3/2016 1537-1542 14 5/4/2016 2135-2140 51 5/5/2016 0953-0958 8 5/5/2016 1407-1412 135 5/12/2016 2236-2241 408 5/13/2016 2117-2122 43 5/31/2016 0012-0017 135 5/31/2016 0211-0216 14 TOTAL 1,041 See attachments TOTAL 0 See attachments Page 1 6/15/2016 2:44 PM BP EXPLORATION (ALASKA) INC. PRUDHOE BAY UNIT- CENTRAL COMPRESSOR PLANT GAS FLARING INCIDENT REPORT May 2016 TOTAL Unplanned Events < 1 Hour n Unplanned Events> 1 Hour Planned Events < 1 hour and not 1,041 exceeding 5,000 MCF Planned Events > 1 hour or exceeding 5,000 MCF Pilot Purge Assist 34,833 TOTAL FLARED VOLUME 35,874 Page 2 6/15/2016 2:44 PM Flare Start Date 05/01/2016 Flare End Date 05/31/2016 CCP Flare Report Total Volume (MSCF) 1041 Report Numbe System Date StartTime Stop Time Duration Intermittent Black Smoke Planned Reported By Volume 16-150 Controlled Blowdown 05/02/2016 5:01:00 pm 5:06:00 pm 5 min No Determination Cause T/C 1808 depressurization from suction pressureto crank pressure. Action Taken T/C 1808 depressurization completed, 16-150 Controlled Blowdown 05/02/2016 6:19:00 pm 6:27:00 pm 8 min No Determination Cause T/C 1808 depressurization from crank pressureto 50 psi. Action Taken T/C 1808 depressurization completed. No Yes BPIISMITLQ 45 No Yes BP1\SMITLQ 8 16-151 Controlled Slowdown 05/03/2016 8:36:00 am 8:41:00 am 5 min No No Determination Cause TIC 1801 de -pressured forwater wash Action Taken T/C 1801 depressurization completed. 16-151 Controlled Blowdown 05/03/2018 10:47:00 am 10:52:00 am 5 min No No Determination Cause TIC 1805 de -pressured from suction pressureto crank pressure. Action Taken TIC 1805 depressurization completed. 16-151 Controlled Blowdavn 05/03/2016 3:37:00 pm 3:42:00 pm 5 min No Determination Cause T/C 1801 de -pressured from spin cool. Action Taken T/C 1801 depressurization completed, 16-189 Controlled Blowdown 05/04/2016 9:35:00 pm 9:40:00 pm 5 min No Determination Cause TIC 1801 vented to 0 psig from full suction pressure after maintenance. Action Taken TIC 1801 de -pressurization complete 16-154 Controlled Blowdown 05/05/2016 9:53:00 am 9:58:00 am 5 min No Determination Cause T/C 1801 de -pressure fmm crank pressure to 50 psi. Action Taken TIC 1801 depressurization completed. Daily Volume (MSCF) 53 Yes BP1\SMITLQ 135 Yes BP1\SMITLQ 45 No Yes BPI\SMITLQ 14 Daily Volume (MSCF) 194 No Yes BP1\MASSIETS 51 Daily Volume (MSCF) 51 No Yes BP1\SMITLQ 8 16-154 Controlled Blowdown 05/05/2016 2:07:00 pm 2:12:00 pm 5 min No No Yes BP1\SMITLQ 135 Determination Cause T/C 1808 Normal stop for maintenance, de -pressured to 50psi. Action Taken T/C 1808 depressurization completed. Daily Volume (MSCF) 143 16-159 Controlled Blowdown 05/12/2016 10:36:00 pm 10:41:00 pm 5 min No No Yes BP1\TOWNER 408 Determination Cause T/C 1876 de -pressured due to 2nd stage nozzle yolk breaking Action Taken TIC 1876 de -pressurization completed. Daily Volume (MSCF) 408 16-161 Controlled Blowdown 05/13/2016 9:17:00 pm 9:22:00 pm 5 min No No Yes BPI\TOWNER 43 Determination Cause 1876 T/C depressured to zero PSI for borescope. Action Taken 1876 TIC stopped venting at zero PSI. Daily Volume (MSCF) 43 16-176 Controlled Blowdown 05/31/2016 12:12:00 am 12:17:00 am 5 min No No Yes BP1\SMITLQ 135 Determination Cause T/C 1807 shutdown and de -pressured for planned maintenance. Action Taken T/C 1807 depressurization completed. 16-176 Controlled Blowdown 05/31/2016 2:11:00 am 2:16:00 am 5 min No No Yes BP1\SMITLQ 14 Generated 06/07/2016 4:33:28PM Page 1 of 9 Flare Start Date 05/01/2010 Flare End Date 05/3112016 Determination Cause TIC 1807 given a stop from spin cool, de -pressured from Crank pressure to 0 psi. Action Taken T1C 1807 depressurization completed. Daily Volume (MSCF) 149 Total Volume (MSCF) 1041 Generated 08/07/2018 4:33:28PM Page 2 of 9 STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMMISSION FACILITY REPORT OF PRODUCED GAS DISPOSITION 1. Facility Number 0290000000 2. Facility Name PBU CCP/FFGU 3. Field PBU - EOA 4. Operator BP 5. MonthlYear of Disposition June -2016 Disposition Volume MCF 20. For production from multiple pools, list contribution of each pool as a percent of Total Volume, 6. Sold 601,000 Pool Name Pool Code Percent 7. Reinjected 165,227,714 PRUDHOE 640150 100.00% 8. Flared or vented 1 hour or less 2,522 9. Flared or vented more than 1 hour (see instr.) 0 10. Pilot and Purge 33,888 11. Assist Gas 0 12. Fuel gas used in lease operations. 4,897,265 13. Other (see instructions) 0 Official Use Only Authorization >7 hr: Safety MCF 14. TOTAL VOLUME (ITEMS 6-12) 170,762,389 Lease Use MCF 15. NGL Gas Equivalent 0 Conservation MCF 16. Purchased gas 0 Waste: MCF 17. Transferred from: CGF & FS1 170,762,389 18. Transferred to: (Express as a negative #) 0 Commissioner Date 19. Remarks: Block 6: Includes Gas Sales to Alyeska Pipeline, Norgasco, Northstar and KRU; Block 12: Includes COTP Non-PBU Fuel Gas = 9,004 mscf; Block 18: Fuel Gas to LPC = 0 mscf I hereby certify that the foregoing is true and correct to the best of my knowledge. yn [ _ Note: All volumes must corrected Signatu�(e `'�'�^-'' \ZS`� Title Manager Production Taxes and Royalties Alaska to pressure Of 14.65 psisia and f0 a temperature of 60o F. Authority 20 --� I $ 11,4 Printed Name Diane ColleyPhone (907) 564-5775 Date AAC25.235. Form 10-422 Rev. 512009 INSTRUCTIONS ON REVERSE SIDE Submit in Duplicate BP EXPLORATION (ALASKA) INC. PRUDHOE BAY UNIT- CENTRAL COMPRESSOR PLANT GAS FLARING INCIDENT REPORT June 2016 Not required for unplanned events <= 1 hr TOTAL 0 See attachments TOTAL 0 events less than or equal to 6/6/2016 1500-1505 45 See attachments 6/15/2016 2155-2240 200 6/24/2016 0355-0400 408 6/24/2016 0730-0735 152 6/25/2016 0045-0050 159 6/25/2016 0315-0320 156 6/25/2016 0515-0520 8 6/25/2016 0515-0520 135 6/25/2016 1305-1310 135 6/25/2016 1556-1601 8 6/25/2016 2017-2022 156 6/25/2016 2228-2233 8 6/26/2016 0035-0040 8 6/26/2016 0035-0040 77 6/26/2016 0130-0135 156 6/26/2016 1815-1820 135 6/27/2016 0010-0015 8 6/27/2016 1020-1025 8 6/1/3016 0330-0335 408 6/30/2016 0751-0756 152 TOTAL 2,522 Not required for unplanned events <= 1 hr See attachments See attachments Page 1 7/18/2016 3:41 PM BP EXPLORATION (ALASKA) INC. PRUDHOE BAY UNIT- CENTRAL COMPRESSOR PLANT GAS FLARING INCIDENT REPORT June 2016 events greater than 1 hour See attachments See attachments TOTAL 0 Pilot Purge 33,888 Assist 0 TOTAL FLARED VOLUME 36,410 Page 2 7/18/2016 3:41 PM TOTAL Unplanned Events < 1 Hour 0 Unplanned Events > 1 Hour 0 Planned Events < 1 hour and not 2,522 exceeding 5,000 MCF Planned Events> 1 hour or 0 exceeding 5,000 MCF Pilot Purge 33,888 Assist 0 TOTAL FLARED VOLUME 36,410 Page 2 7/18/2016 3:41 PM Flare Start Date 06/01/2016 Flare End Date 06/30/2016 CCP Flare Report Total Volume (MSCF) 2522 Report Numbs System Date StartTime Stop Time Duration Intermittent Black Smoke Planned Reported By Volume 16-188 Controlled Slowdown 06/06/2016 3.00 00 pm 3:05:00 pm 5 min No No Yes BPt\CLEMENC 45 Determination Cause T\C 1807 shutdown for planned maintenance Determination Cause TC 1804 shutdown for water wash Action Taken Purge complete and turbine started Action Taken T/C 1804 depressurization completed. 16-214 Controlled Blowdown 06/25/2016 1:05:00 pm 1:10:00 pm Daily Volume (MSCF) 45 16-207 Controlled Slowdown 06/15/2016 9:55:00 pm 10:40:00 pm 45 min No No Yes BP1\TOWNER 200 Determination Cause FFGU Cap Gas Separators, Contactors, Heater/Coolers depressured for PSV PM's from 596 PSI to zero PSI. Action Taken FFGU Separators, Contactors, Heater/Coolers stopped venting at zero PSI. Action Taken T/C 1806 depressurization completed. Daily Volume (MSCF) 200 16-213 Controlled Blowdown 06/24/2016 3:55:00 am 4:00:00 am 5 min No No Yes BP1\BRAUJW 408 Determination Cause T\C 1878 shutdown for planned maintenance Action Taken T/C 1878 depressurization completed. 16-213 Controlled Blowdown 06/24/2016 73000 am 7:35:00 am 5 min No No Yes BP10RAUJW 152 Determination Cause T\C 1878 spin cooling 156 Determination Cause T\C 1812 depressured for water wash Action Taken T/C 1878 depressurized and shut down. Action Taken T/C 1812 depressurization completed. Daily Volume (MSCF) 560 16-214 Controlled Blowdown 06/25/2016 12:45:00 am 12:50:00 am 5 min No No Yes BP1\BRAUJW 159 Determination Cause T\C 1811 shutdown for planned maintenance Action Taken T/C 1811 depressurized and shut down. 16-214 Controlled Slowdown 06/25/2016 3:15:00 am 3:20:00 am 5 min No No Yes BPi\BRAUJW 156 Determination Cause T\C 1810 shutdown for planned maintenance Action Taken T/C 1810 depressurized and shutdown. 16-214 Controlled Blowdown 06/25/2016 5 1500 am 5:20:00 am 5 min No No Yes BP1\BRAUJW 8 Determination Cause -RC 1810 spin cooling complete Action Taken T/C 1810 depressurized and shut down. 16-214 Controlled Blowdown 06/25/2016 5:15:00 am 5:20:OOam 5min No No Yes BP1\BRAUJW 135 Determination Cause TC 1804 shutdown for water wash Action Taken T/C 1804 depressurization completed. 16-214 Controlled Blowdown 06/25/2016 1:05:00 pm 1:10:00 pm 5 min No No Yes BP1\WALK54 135 Determination Cause T/C 1806 shut down for water wash Action Taken T/C 1806 depressurization completed. 16-214 Controlled Blowdown 06/25/2016 3.56:00 pm 4:01:00 pm 5 min No No Yes BP1\WALK54 8 Determination Cause T\C 1806 spin cooling from crank pressure to 50 prig Action Taken 1806 T/C depressurization completed. 16-214 Controlled Blowdown 06/25/2016 8:17:00 pm 8:22:00 pm 5 min No No Yes BP7\SRAUJW 156 Determination Cause T\C 1812 depressured for water wash Action Taken T/C 1812 depressurization completed. 16-214 Controlled Blowdown 06/25/2016 10:28:00 pm 10:33:00 pm 5 min No No Yes BP1\BRAUJW 8 Determination Cause T\C 1812 spin cooling Action Taken T/C 1812 depressurized and shut down. Daily Volume (MSCF) 765 Generated 07/06/2016 1:44:03PM Page 1 of 11 Flare Start Date 06/01/2016 Flare End Date 06/30/2016 16-216 Controlled slowdown 06/26/2016 12:35:00 am 12:40:00 am 5 min No No Yes BP1\BRAUJW 8 Determination Cause TIC 1811 depressured from CRANK pressure to 50 psi. Trouble with flame detector Action Taken T/C 1811 depressurization completed. 16-216 Controlled Blowdown 06/26/2016 12:35:00 am 12:40:00 am 5 min No No Yes BP1\BRAUJW 77 Determination Cause T/C 1811 De -pressured following pressure test to full suction pressure down to crank pressure. Action Taken TIC 1811 depressurization completed. 16-216 Controlled Blowdown 06/26/2016 1:30:00 pm 1:35:00 pm 5 min No No Yes BP1\WALK54 156 Determination Cause T\C 1809 depressured for water wash Action Taken 1809 TIC depressurization completed. 16-216 Controlled Blowdown 06/26/2016 6:15:00 pm 6:20:00 pm 5 min No No Yes BP1MALK54 135 Determination Cause T\C 1805 depressured for water wash Action Taken 1805 T/C depressurization completed. Daily Volume (MSCF) 16-222 Controlled 8lowdown 06/27/2016 121000 am 12:15:00 am 5 min No No Yes BP1\BRAUJW Determination Cause -RC 1805 spin cooling complete Action Taken T/C 1805 depressurized and shut down. 16-222 Controlled Blowdown 06/27/2016 10:20:00 am 10:25:00 am 5 min No No Yes BPIIWALKS4 Determination Cause T\C 1805 depressured forwater wash Action Taken 1805 T/C depressurization completed. 16-227 Controlled slowdown 06/30/2016 3:30:00 am 3:35:00 am 5 min No Determination Cause T\C 1878 shutdown for planned maintenance Action Taken 1878 T/C depressurization completed. 16-227 Controlled slowdown 06/30/2016 7:51:00 am 7:56:00 am 5 min No Determination Cause T\C 1878 from spin cooling Action Taken 1878 TIC depressurization completed. Daily Volume (MSCF) 376 8 8 i6 No Yes BP7\GREGWD 405 No Yes BP1\WALK54 152 Daily Volume (MSCF) 560 Total Volume (MSCF) 2522 Generated 07/06/2016 1:44:03PM Page 2 of 11 STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMMISSION FACILITY REPORT OF PRODUCED GAS DISPOSITION 1. Facility Number 0290000000 2. Facility Name PBU CCPIFFGU 3. Field PBU - EOA 4. Operator BP 5. MonthNear of Disposition July -2016 Disposition Volume MCF 20. For production from multiple pools, list contribution of each pool as a percent of Total Volume. 6. Sold 473,672 Pool Name Pool Code Percent 7. Reinjected 177,196,644 PRUDHOE 640150 100.00% 8. Flared or vented 1 hour or less 0 9. Flared or vented more than 1 hour (see instr.) 0 10. Pilot and Purge 34,876 11. Assist Gas 0 12. Fuel gas used in lease operations. 5,173,137 13. Other (see instructions) 0 Official Use Only Authorization >i hr: Safety MCF 14. TOTAL VOLUME (ITEMS 6-12) 182,878,329 Lease Use MCF 15. NGL Gas Equivalent 0 Conservation MCF 16. Purchased gas D Waste: MCF 17. Transferred from: CGF B FSI 182,878,329 18. Transferred to: (Express as a negative #) 0 Commissioner Date 19. Remarks: Block 6: Includes Gas Sales to Alyeska Pipeline, Norgasco, Northstar and KRU; Block 12: Includes COTP Non-PBU Fuel Gas = 293 mscf; Block 18: Fuel Gas to LPC = 0 mscf I hereby certify that the foregoing is true and correct to the best of my knowledge. / �p��" n Note: All volumes must be corrected Signature L(Nf tC �" I Title Mana er Production Taxes an Ro allies Alaska to pressure of 14.65 psis and to a / temperature of 60o F. Authority 20 Printed Name Diane Colley Phone (907) 564-5775 Date Al /10 AAC25.235. Form 10-422 Rev. 512009 INSTRUCTIONS ON REVERSE SIDE Submit in Duplicate BP EXPLORATION (ALASKA) INC. PRUDHOE BAY UNIT- CENTRAL COMPRESSOR PLANT GAS FLARING INCIDENT REPORT July 2016 Unplanned events less than or equal to 1 hour DATE TIME VOLUME DESCRIPTION OF INCIDENT & CAUSE ACTION TAKEN TO ELIMINATE CAUSE Not required for unplanned events <= 1 hr Not required for unplanned events <= 1 hr TOTAL 0 Unplanned events greater than 1 hour TOTAL 0 Planned events less than or equal to 1 hour TOTAL See attachments See attachments 0 See attachments TOTAL 0 ACTION TAKEN TO 1 See attachments See attachments See attachments CAUSE Page 1 8/11/2016 9:46 AM TOTAL Unplanned Events < 1 Hour 0 Unplanned Events > 1 Hour 0 Planned Events < 1 hour and not 0 exceeding 5,000 MCF Planned Events> 1 hour or 0 exceeding 5,000 MCF Pilot Purge 34,876 Assist 0 TOTAL FLARED VOLUME 34,876 ACTION TAKEN TO 1 See attachments See attachments See attachments CAUSE Page 1 8/11/2016 9:46 AM BP Exploration (Alaska) Inc. PO Box 196612 900 East Benson Boulevard Anchorage, Alaska 99519-6612 August 11, 2016 To: Recipients of the Prudhoe Facility Gas Disposition Reports (AOGCC Form 10-422) Enclosed are the July 2016 Prudhoe Facility Gas Disposition and Gas Flaring Incident Summary reports for the following Prudhoe facilities: Central Compression Plant Central Gas Facility Flow Station 1 Flow Station 2 Flow Station 3 Gathering Center 1 Gathering Center 2 Gathering Center 3 If you have any questions about this report, please contact Gary Benson at (907) 564-4604. Sincerely, 60� elk Diane Colley Manager, Production Taxes and Royalties Alaska Enclosure STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMMISSION FACILITY REPORT OF PRODUCED GAS DISPOSITION 1. Facility Number 0290000000 2. Facility Name PBU CCP/FFGU 3. Field PBU - EOA 4. Operator BP 5. Month/Year of Disposition August -2016 Disposition Volume MCF 20. For production from multiple pools, list contribution of each pool as a percent of Total Volume. 6. Sold 507,148 Pool Name Pool Code Percent 7. Reinjected 166,849,301 PRUDHOE 640150 100.00% 8. Flared or vented 1 hour or less 610 9. Flared or vented more than 1 hour (see instr.) 0 10. Pilot and Purge 34,883 11. Assist Gas 0 12. Fuel gas used in lease operations. 5,412,562 13. Other (see instructions) Official Use OnlyAuthorization >1 hr: Safety MCF 14. TOTAL VOLUME (ITEMS 6-12) 15. NGL Gas Equivalent 16. Purchased gas 17. Transferred from: CGF & FS1 1441 iii Sb`I 0 0 194,890,125 Lease Use MCF Conservation MCF Waste: MCF 18. Transferred to: (Express as a negative #) —Yiyrb2�9 Commissioner Date 1 1 19. Remarks: Block 6: Includes Gas Sales to Alyeska Pipeline, Norgasco, Northstar and KRU; Block 12: Includes COTP Non-PBU Fuel Gas = 1,937 mscf; Block 18: Fuel Gas to LPC = 85,621 mscf I hereby certify that the foregoing is We and correct to the best of my knowledge. / Note: All volumes must be corrected Signature anial MO �{, Title Manager Production Taxes and Ro alties Alaska to pressure of 14.65 psla and to a �q temperature of 60o F. Authority 20 Printed Name Diane Calle Phone (907) 564-5775 Date / 1 AAC25.235. Form 10-422 Rev. 512009 INSTRUCTIONS ON REVERSE SIDE Submit in Duplicate BP EXPLORATION (ALASKA) INC. PRUDHOE BAY UNIT- CENTRAL COMPRESSOR PLANT GAS FLARING INCIDENT REPORT August 2016 events less than or equal to 1 Not required for unplanned events <= 1 hr TOTAL 0 Not required for unplanned events <= 1 hr DATE TIME DESCRIPTION OF INCIDENT & CAUSE ACTION TAKEN TO ELIMINATE CAUSE See attachments See attachments TOTAL 0 Planned events less than or equal to 1 hour DATE TIME VOLUME DESCRIPTION OF INCIDENT & CAUSE ACTION TAKEN TO ELIMINATE CAUSE 8/27/2016 0325-0330 202 See attachments See attachments 8/27/2016 0540-0545 408 TOTAL 610 TOTAL Unplanned Events < 1 Hour Unplanned Events > 1 Hour Planned Events < 1 hour and not exceeding 5,000 MCF Planned Events > 1 hour or exceeding 5,000 MCF Pilot Purge Assist TOTAL FLARED VOLUME VOLUME DESCRIPTION OF INCIDENT & See attachments 0 TOTAL 0 0 610 0 34,883 0 35,493 See attachments Page 1 9/12/2016 9'44 AM FlareStartDate 08/01/2016 Flare End Date 08/31/2016 CCP Flare Report Total Volume (MSCF) 610 Report Numbs System Date Start Time Stop Time Duration Intermittent Black Smoke Planned Reported By Volume 16-273 Controlled Blowdown 08/27/2016 3:25:00 am 3:30.00 am 5min No No Yes BPI IWALK54 202 Determination Cause NGlline#3 and #4 depressured for line lift Action Taken Depressurization complete 16-273 Controlled Blowdown 08/27/2016 5:40:00 am 5:45:00 am 5 min NO No Yes BP1WANGMM 408 Determination Cause =1876 shutdown for planned maintenance Action Taken T/C 1876 depressurized and shut down. Daily Volume (MSCF) 610 Total Volume (MSCF) 610 Generated 09101/2016 3:47:14PM Page 1 of 9 RECEIVED by jS�EP 113%C 0 220116 BP Exploration (Alaska) Inc PO Box 196612 900 East Benson Boulevard Anchorage, Alaska 99519-6612 September 12, 2016 To: Recipients of the Prudhoe Facility Gas Disposition Reports (AOGCC Form 10-422) Enclosed are the August 2016 Prudhoe Facility Gas Disposition and Gas Flaring Incident Summary reports for the following Prudhoe facilities: Central Compression Plant Central Gas Facility Flow Station 1 Flow Station 2 Flow Station 3 Gathering Center 1 Gathering Center 2 Gathering Center 3 If you have any questions about this report, please contact Gary Benson at (907) 564-4604. Sincerely, Diane Coll Y Manager, Production Taxes and Royalties Alaska Enclosure STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMMISSION FACILITY REPORT OF PRODUCED GAS DISPOSITION 1. Facility Number 0290000000 2. Facility Name PBU CCP/FFGU 3. Field PBU - EOA 4. Operator BP 5. MonthNear of Disposition I September -2016 Disposition Volume MCF 20. For production from multiple pools, list contribution of each pool as a percent of Total Volume. 6. Som 747,585 Pool Name Pool Code Percent 7. Reinjected 184,906,576 PRUDHOE 640150 100.00% 8. Flared or vented 1 hour or less 552 9. Flared or vented more than 1 hour (see instr.) 0 10. Pilot and Purge 33,775 11. Assist Gas 0 12. Fuel gas used in lease operations. 5,254,476 13. Other (see instructions) 0 Official Use Only Authorization 11 hr Safety MCF 14. TOTAL VOLUME (ITEMS 6.12) 190,942,964 Lease Use MCF 15. NGL Gas Equivalent 0 Conservation MCF 16. Purchased gas 0 Waste: MCF 17. Transferred from: CGF & FSI 190,989,975 1 18. Transferred to: (Express as a negative #) -47,011 Commissioner Date 19. Remarks: Block 6: Includes Gas Sales to Alyeska Pipeline, Norgasco, Northstar and KRU; Block 12: Includes COTP Non-PBU Fuel Gas = 3,743 mscf,, Block 18: Fuel Gas to LPC = 47,011 mscf I hereby certify that the foregoing is true and correct to the best of my knowledge. %�/}�j Note: All volumes must be corrected Signature_ wr l' �"'�: Title Maria er Production Taxes and Ro allies Alaska to pressure of 14.65 psis and to a y-7 /j// 99 temperature of 600 F. Authority 20 Printed Name Diane ColleyPhone (907) 564-5775 Date C� / /+� AAC25.235. Form 10-422 Rev. 512009 INSTRUCTIONS ON REVERSE SIDE Submit in Duplicate BP EXPLORATION (ALASKA) INC. PRUDHOE BAY UNIT - CENTRAL COMPRESSOR PLANT GAS FLARING INCIDENT REPORT September 2016 junplanneo events less than or equal to 1 hour DATE TIME VOLUME DESCRIPTION OF INCIDENT & CAUSE ACTION TAKEN TO ELIMINATE CAUSE 9/22/2016 0915-0922 156 Not required for unplanned events <= 1 hr Not required for unplanned events <= 1 hr 9/30/2016 1012-1017 135 TOTAL 291 Unplanned events greater than 1 hour DATE TIME DESCRIPTION OF INCIDENT & CAUSE ACTION TAKEN TO ELIMINATE CAUSE See attachments See attachments TOTAL 0 9/17/2016 0820-0825 9/17/2016 1004-1006 9/19/2016 1820-1825 9/19/2016 2149-2154 9/20/2016 0534-0539 TOTAL 159 See attachments 14 77 8 3 261 See attachments Planned events greater than 1 hour DATE TIME VOLUME DESCRIPTION OF INCIDENT&CAUSE ACTION TAKEN TO ELIMINATE CAUSE See attachments See attachments TOTAL 0 TOTAL Unplanned Events < 1 Hour 291 Unplanned Events> 1 Hour 0 Planned Events < 1 hour and not 261 exceeding 5,000 MCF Planned Events> 1 hour or 0 exceeding 5,000 MCF Pilot Purge 33,775 Assist 0 TOTAL FLARED VOLUME 34,327 Page 1 10/14/2016 1:31 PM Flare Start Dale 09/01/2016 Flare End Date 09/30/2016 CCP Flare Report Total Volume (MSCF) 552 Report Numbe System Date Start Time Stop Time Duration Intermittent Black Smoke Planned Reported By Volume 16-310 Controlled Blowdown 09/17/2016 82000am 8:25.00 am 5min No No Yes BP1\MANGMM 159 Determination Cause TC 1811 shutdown due to a cracked nipple on the P55-CDE header. Action Taken T/C 1811 depressurized to 0 psi and shut down. 16-310 Controlled Blowdown 09/17/2016 10:04:00 am 10:06:00 am 2 min No No Yes BP1\WALK54 14 Determination Cause FFGU flare P-17 opened for de -pressure for SD -6 valve leak check. Action Taken Closed P-17 Daily Volume (MSCF) 173 16-316 Controlled Blowtlown 09/19/2016 6:20:00 pm 6:25:00 pm 5 min No No Yes BP1\MANGMM 77 Determination Cause T/C 1811 pressure test complete- full suction pressure. Action Taken T/C 1811 depressured to holding pressure (50 psi). 16-316 Controlled Slowdown 09/19/2016 9:49:00 pm 9:54:00 pm 5 min No No Yes BP1\WALK54 8 Determination Cause T\C 1811 depressured from water wash cranking 175 PSI to 50 PSI. Action Taken 1811 T/C depressurization completed. Daily Volume (MSCF) 85 16-318 Controlled Blowdown 09/20/2016 5:34:00 am 5:39:00 am 5 min No No Yes SP1\WALK54 3 Determination Cause T\C 1811 de -pressured from holding 50 PSI to 0 PSI for isolation. Action Taken 1811 T/C depressurization completed. Daily Volume (MSCF) 3 Total Volume (MSCF) 552 Generated 10/04/2016 2:32:30PM Page 1 of 10 STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMMISSION FACILITY REPORT OF PRODUCED GAS DISPOSITION 1. Facility Number 0290000000 2. Facility Name PBU CCPtFFGU 3. Field PBU - EOA 4. Operator BP 5. Month/Year of Disposition October -2016 Disposition Volume MCF 20. For production from multiple pools, list contribution of each pool as a percent of Total Volume. 6. Sold 900,080 Pool Name Poolcode Percent 7. Reinjected 195,706,484 PRUDHOE 640150 100.00% 8. Flared or vented 1 hour or less 3,780 9. Flared or vented more than 1 hour (see instr.) 0 10. Pilot and Purge 34,967 11, Assist Gas 0 12. Fuel gas used in lease operations. 5,382,868 13. Other (see instructions) 0 Official Use Only Authorization >1 hr: Safety MCF 14. TOTAL VOLUME (ITEMS 6-12) 202,028,179 Lease Use MCF 15, NGL Gas Equivalent 0 Conservation MCF 16. Purchased gas 0 Waste: MCF 17. Transferred from: CGF & FS1 202,028,179 18. Transferred to: (Express as a negative #) 0 Commissioner Date 19. Remarks: Block 6: Includes Gas Sales to Alyeska Pipeline, Norgasco, Northstar and KRU; Block 12: Includes COTP Non-PBU Fuel Gas = 2,157 mscf; Block 18: Fuel Gas to LPC = 0 mscf I hereby certify that the foregoing is true and correct to the best of my knowledge. ntt /11�� � Signature (,� Title Mana er Production Taxes and Ro Ities Alaska Note: All volumes must be corrected to pressure of 14.65 psia and to a temperature of 60o F. Authority 20 AAC25.235. Printed Name Diane Colley Phone (907) 564-5775 Date d/ )116; Form 10-422 Rev. 5/2009 INSTRUCTIONS ON REVERSE SIDE Submit in Duplicate BP EXPLORATION )ALASKA) INC. PRUDHOE BAY UNIT- CENTRAL COMPRESSOR PLANT GAS FLARING INCIDENT REPORT October 2016 Unplanned events less than or equal to 1 hour DATE TIME VOLUME DESCRIPTION OF INCIDENT & CAUSE ACTION TAKEN TO ELIMINATE CAUSE Not required for unplanned events <= 1 hr Not required for unplanned events <= 1 hr TOTAL 0 Unplanned events greater than 1 hour DATE TIME DESCRIPTION OF INCIDENT & CAUSE ACTION TAKEN TO ELIMINATE CAUSE See attachments See attachments TOTAL 0 Planned events less than or equal to 1 hour 10/13/2016 0035-0040 10/13/2016 0300-0305 10/13/2016 1155-1200 10/13/2016 1250-1255 10/13/2016 1430-1435 10/14/2016 1000-1005 10/14/2016 1220-1225 10/16/2016 2220-2225 10/17/2016 0500-0505 10/17/2016 0545-0550 10/19/2016 2200-2205 10/20/2016 0015-0020 10/20/2016 0035-0040 10/20/2016 0300-0305 10/20/2016 0510-0515 10/20/2016 0758-0803 10/20/2016 1511-1516 10/20/2016 1559-1604 10/20/2016 1751-1756 10/20/2016 1944-1949 10/21/2016 0001-0010 10/21/2016 0220-0225 DESCRIPTION OF IN 135 See attachments 8 8 156 8 135 14 51 14 8 135 8 156 11 135 14 8 141 135 8 156 8 See attachments Page 1 11/16/2016 5:13 PM BP EXPLORATION (ALASKA) INC. Page 2 PRUDHOE BAY UNIT- CENTRAL COMPRESSOR PLANT GAS FLARING INCIDENT REPORT October 2016 10/21/2016 0300-0310 156 10/21/2016 0828-0833 8 10/21/2016 1157-1202 6 10/21/2016 1324-1329 3 10/21/2016 1700-1705 6 10/21/2016 1801-1806 135 10/21/2016 2023-2030 14 10/22/2016 1118-1123 14 10/22/2016 1222-1227 28 10/22/2016 1600-1605 36 10/22/2016 1826-1831 135 10/22/2016 2008-2020 135 10/22/2016 2230-2240 8 10/23/2016 0550-0600 135 10/23/2016 0747-0752 8 10/23/2016 1626-1631 135 10/23/2016 2125-2135 135 10/24/2016 0136-0141 14 10/24/2016 0428-0438 156 10/24/2016 2040-2045 45 10/25/2016 0030-0042 420 10/25/2016 0422-0432 152 10/27/2016 0800-0805 35 10/28/2016 0358-0403 152 10/28/2016 1224-1254 13 10/28/2016 1418-1423 109 10/29/2016 1532-1537 135 TOTAL 3,780 See attachments See attachments TOTAL 0 11/16/2016 5:13 PM BP EXPLORATION (ALASKA) INC. PRUDHOE BAY UNIT - CENTRAL COMPRESSOR PLANT GAS FLARING INCIDENT REPORT October 2016 TOTAL Unplanned Events < 1 Hour 0 Unplanned Events> 1 Hour 0 Planned Events < 1 hour and not 3,780 exceeding 5,000 MCF Planned Events> 1 hour or 0 exceeding 5,000 MCF Pilot Purge 34,967 Assist 0 TOTAL FLARED VOLUME 38,747 Page 3 11/16/2016 5:13 PM FlareStartDate 10/01/2016 Flare End Date 10/31/2016 CCP Flare Report Total Volume (MSCF) 3780 Report Numbs System Date Start Time Stop Time Duration Intermittent Black Smoke Planned Reported By Volume 16-357 Controlled Slowdown 10/13/2016 1235:00 am 12:40:00 am 5 min No No Yes BP1\MANGMM 135 Determination Cause T\C 1808 depressured for spin cool. Action Taken T/C 1808 depressurized and shut down. 16-357 Controlled Blowdown 10/13/2016 3:00:00 am 3:05:00 am 5 min No No Yes BP1WANGMM 8 Determination Cause T\C 1808 done spin cooling Action Taken T/C 1808 depressurized and shut down. 16-357 Controlled Blowdown 10/13/2016 11:55:00 am 12:00:00 pm 5 min No No Yes BP1\BAKERWF 8 Determination Cause TC 1808 shutdown after waterwash complete to normal up unit. Action Taken 1808 T/C depressurization completed. 16-357 Controlled Blowdown 10/13/2016 12:50:00 pm 12:55:00 pm 5 min No No Yes BP1\BAKERWF 156 Determination Cause TTC 1810 depressured for water wash Action Taken 1810 TIC depressurization completed. 16-357 Controlled Slowdown 10/13/2016 2:30:00 pm 2:35:00 pm 5 min No No Yes BP7\BAKERWF 8 Determination Cause T\C 1810 shutdown from spin cooling. Action Taken 1810 T/C depressurization completed. Daily Volume (MSCF) 315 16-359 Controlled Blowdown 10/14/2016 10:00:00 am 10:05:00 am 5 min No No Yes BP1\BAKERWF 135 Determination Cause T\C 1813 depressured for water wash Action Taken 1813 T/C depressurization completed. 16-359 Controlled Blowdown 10/14/2016 12:20:00 pm 12:25:00 pm 5 min No No Yes BP7\BAKERWF 14 Determination Cause -RC 1813 shut down fmm spin cooling Action Taken 1813 T/C depressurization completed. Daily Volume (MSCF) 149 16-366 Controlled Blowdown 10/16/2016 10:20:00 pm 10:25:00 pm 5 min No No Yes BP1\MANGMM 51 Determination Cause T\C 1813 depressured from pressure check. Action Taken T/C 1813 fully depressurized. Daily Volume (MSCF) 51 16-367 Controlled Blowdown 10/17/2016 50000 am 5:05:00 am 5 min No No Yes BPi\MANGMM 14 Determination Cause T\C 1813 depressurized from Cranking pressure. Action Taken T/C 1813 depressurization completed 16-367 Controlled Blowdown 10/17/2016 54500 am 5:50.00 am 5 min No No Yes BPI\MANGMM 8 Determination Cause T\C 1813 depressured from Cranking pressure. Action Taken T/C 1813 depressurization completed. Daily Volume (MSCF) 22 16-368 Controlled Blowdown 10/19/2016 10:00:00 pm 10:05:00 pm 5 min No No Yes BP1\MANGMM 135 Determination Cause T/C 1807 S/D for spin cool. Action Taken T/C 1807 depressurization completed. Daily Volume (MSCF) 135 16-369 Controlled Blowdown 10/20/2016 12:15:00 am 12:20:00 am 5min No No Yes BP1\MANGMM 8 Determination Cause T\C 1807 shutdown from spin cool. Generated 11102/2016 4:05:39PM Page 1 of 12 FlareStartDate 10/01/2016 9 min No Flare End Date 10/31/2016 TIC 1809 depressured to 50# for spin cool. Action Taken T/C 1807 depressurized and shutdown. Action Taken 16-369 Controlled Blowdown 10/20/2016 12:35:00 am 12:40:00 am 5 min No No Determination Cause T\C 1812 shutdown for spin cool. 5 min No Action Taken T/C 1812 depressurization completed. T/C 1809 depressured after spin cool 16-369 Controlled Blowdown 10/20/2016 3:00:00 am 3:05:00 am 5 min No No Determination Cause TRC 1812 shutdown from spin cool. Action Taken T/C 1812 depn:ssudzed and shut down. 10 min No 16-369 Controlled Blowdown 10/20/2016 5:10:00 am 5:15:00 am 5 min No No Determination Cause T\C 1806 shutdown for spin cool. T/C 1809 pressure test complete Action Taken T/C 1806 depressurized and shut down. 16-371 Controlled Slowdown 10/21/2016 8:28:00 am 8:33:00 am 16-369 Controlled Blowdown 10/20/2016 7:58:00 am 8:03.00 am 5 min No No Determination Cause T\C 1806 depressured from spin cool for water wash by casis testing (low overhead seal oil trip) Action Taken 1806 TIC depressurized and shut down. 1804 T/C depressurization completed. 16-369 Controlled Blowdown 10/20/2016 3:11:00 pm 3:16:00 pm 5 min No No Determination Cause T\C 1807 shutdown for check valve testing Determination Cause Action Taken 1807 TIC depressurization completed. Action Taken 16-369 Controlled Blowdown 10/20/2016 3:59:00 pm 4:04:00 pm 5 min No No Determination Cause TRC 1807 shutdown due to a problem associated with T-9 valve. ( high suction temp) Action Taken 1807 T/C depressurized and shut down. TRC 1809 depressured for ICC installation. 16-369 Controlled Blowdown 10/20/2016 5:51:00 pm 5:56:00 pm 5 min No No Determination Cause T\C 1804 depressured for water wash with CASIS test, high discharge temp. Action Taken 1804 T/C depressurization completed. 16-369 Controlled Blowdown 10/20/2016 7:44:00 pm 7:49:00 pm 5 min No No Determination Cause T\C 1804 normal stop, vented to 50# after spin cool complete. Action Taken T\C 1804 normal stop, vented to 50# after spin cool complete. 16-371 Controlled Blowdown 10/21/2016 12:01:00 am 12:10:00 am 9 min No Determination Cause TIC 1809 depressured to 50# for spin cool. No Action Taken 1809 T/C depressurization completed. 8 16-371 Controlled Blowdown 10/21/2016 2:20:00 am 2:25:00 am 5 min No Determination Cause T/C 1809 depressured after spin cool 6 Action Taken 1809 depressunzation Complete. 16-371 Controlled Blowdown 10/21/2016 3:00:00 am 3:10:00 am 10 min No Determination Cause T/C 1809 vented down after full suction pressure test Action Taken T/C 1809 pressure test complete 16-371 Controlled Slowdown 10/21/2016 8:28:00 am 8:33:00 am 5 min No Determination Cause T\C 1804 depressured for maintenance. Action Taken 1804 T/C depressurization completed. 16-371 Controlled Blowdown 10/21/2016 11:57:00 am 12:02:00 pm 5 min No Determination Cause T\C 1804 depmwumd for VIGV servo wok ICC application. Action Taken 1804 TIC depressurized. 16-371 Controlled Blowdown 10/21/2016 1:24:00 pm 1:29:00 pm 5 min No Determination Cause TRC 1809 depressured for ICC installation. Yes BP1\MANGMM 156 Yes BP1WANGMM 11 Yes BP1\MANGMM 135 Yes BP1\WALK54 14 Yes B!"IMALK54 8 Yes BP1\WALK54 141 Yes BPlNWALK54 135 Yes BPI\SLAUGL 8 Daily Volume (MSCF) 616 No Yes No Yes BP1\SLAUGL 156 BP1\SLAUGL 8 No Yes BP1\SLAUGL 156 No Yes BPI\WALK54 8 No Yes B!"IMALK54 6 No Yes BP1\WALK54 3 Generated 11/02/2016 4:05:39PM Page 2 of 12 Flare Start Date 10/01/2016 Flare End Date 10131/2016 Action Taken 1809 T/C depressurization completed. 16-371 Controlled Blowdown 10/21/2016 5:00:00 pm 5:05:00 pm 5 min No Determination Cause T\C 1804 depressured for check valve testing. Action Taken 1804 T/C depressurization completed. 16-371 Controlled Blowdown 10/21/2016 6:01:00 pm 6:06:00 pm 5 min No Determination Cause T\C 1803 depressured for water wash Action Taken 1803 T/C depressurized and shut down. 16-371 Controlled Blowdown 10/21/2016 8:23:00 pm 8:30:00 pm 7 min No Determination Cause T/C 1803 shutdown and depressure from CRANK to 0 psig Action Taken depressure/shut down complete No Yes BP1\WALK54 6 No Yes BP1\WALK54 135 No Yes BP1\SLAUGL 14 16-374 Controlled Blowdown 10/22/2016 11:18:00 am 11:23:00 am 5 min No No Determination Cause T/C 1806 vented down from crank pressure to zero PSI. Flare volume 14 MSCF. Leak on PSV. Action Taken depressurization complete 16-374 Controlled Blowdown 10/22/2016 12:22:00 pm 12:27:00 pm 5 min No No Determination Cause T\C 1806 depressured from pressure test for leak on P55SV sensing line. Action Taken 1806 T/C depressurization completed. 16-374 Controlled Blowdown 10/22/2016 4:00:00 pm 4:05:00 pm 5 min No No Determination Cause T\C 1806 depressured from leak test. Action Taken 1806T/C depressurization completed. Depressured to crank PSI for water wash. Daily Volume (MSCF) 492 Yes BP1\SLAUGL 14 Yes BP1\WALK54 28 Yes BP1\WALK54 36 16-374 Controlled Blowdown 10/22/2016 6:26:00 pm 6:31:00 pm 5 min No No Yes BP1\WALK54 135 Determination Cause T\C 1806 depressured for CASIS testing. Action Taken 1806 T/C depressurization completed. 16-374 Controlled Blowdown 10/22/2016 8:08:00 pm 8:20:00 pm 12 min No No Yes BP1\SLAUGL 135 Determination Cause T/C 1805 normal stop for water wash. Depressuretl to 50 psig. Flared 135 mscf. Action Taken Depressurization complete. 16-374 Controlled slowdown 10/22/2016 10:30:00 pm 10:40:00 pm 10 min No No Yes BP1\SLAUGL 8 Determination Cause T/C 1805 Normal Stop after spin cool. Depressuretl from 150# to 50#, flared 8 mscf. Action Taken Depressuring complete. Daily Volume (MSCF) 356 16-375 Controlled Blowdown 10/23/2016 5:50:00 am 6:00:00 am 10 min No No Yes BP1\SLAUGL 135 Determination Cause T/C 1802 Normal Stop for W W, vent down to 50#, flared 135 mscf Action Taken depressure complete 16-375 Controlled Slowdown 10/23/2016 7:47:00 am 7:52:00 am 5 min No No Yes BP1\WALK54 8 Determination Cause T\C 1802 depressured from spin cool crank speed to 50 PSIG. Action Taken 1802 T/C depressurization completed. 16-375 Controlled Blowdown 10/23/2016 4:26:00 pm 4:31:00 pm 5 min No No Yes BP1\WALK54 135 Determination Cause T\C 1803 depressured from pressure test 575 to -50 PSI. Action Taken 1803 T/C depressurization completed. 16-375 Controlled Slowdown 10/23/2016 9:25:00 pm 9:35:00 pm 10 min No No Yes BP1\SLAUGL 135 Determination Cause T/C 1801 S/D forwater wash, depressured to 50#, flared 135 mscf. Action Taken depressurization complete Daily Volume (MSCF) 413 Generated 11/02/2016 4'05:39PM Page 3 of 12 Flare StartDate 10/01/2016 Daily Volume (MSCF) 572 Flare End Date 10/31/2016 Yes BPIIMASSIETS 35 16-377 Controlled Blowdown 10/24/2016 1:36:00 am 1:41:00 am 5 min No No Yes BP14SLAUGL 14 Determination Cause T/C 1801 shut down. Depressured from #150 - 0#, flared 14 mscf. SSOV TO LP FLARE" and not to Meter 477, Action Taken depressurization complete - 16-377 Controlled Blowdown 10/24/2016 4:28:00 am 4:38:00 am 10 min No No Yes BPl ZLAUGL 156 Determination Cause T/C 1809 normal stop, depressured to 50#, flared 156 mscf. 152 Determination Cause T\C 1878 depressured after pressure check Action Taken depressurization complete Action Taken 1878 depressurization complete 16-377 Controlled Blowdown 10/24/2016 8:40:00 pm 8:45:00 pm 5 min No No Yes BPlZLAUGL 45 Determination Cause T/C 1801 suction pressure test and check valve F-136 test complete (passed), vented down from 500# to 50#, flared 45 mscf 13 Action Taken vent down complete Action Taken 1878 T/C valve sequence purge complete Daily Volume (MSCF) 215 16-380 Controlled Blowdown 10/25/2016 12:30:00 am 12:42:00 am 12 min No No Yes BP7\SLAUGL 420 Determination Cause T/C 1878 SID for spin cool and water wash. Lo OVHD SO CASTS trip. Depressured from sequence complete status to zero, flared 420 mad. Action Taken Tandem T/C 1878 de-pressunzation complete. Action Taken T/C 1878 depressured to zero Daily Volume (MSCF) 16-380 Controlled Blowdown 10/25/2016 422:00 am 4:32:00 am 10 min No No Yes BP1XSLAUGL 152 Determination Cause T/C 1878 S/D by LO OVHD SO CASTS trip. Depressured from crank/suction pressureto zero, flared 152 mscf Action Taken Depressunng complete Total Volume (MSCF) 3780 Generated 11/02/2016 4:05:39PM Page 4 of 12 Daily Volume (MSCF) 572 16-385 Controlled Blowdown 10/27/2016 8:00:00 am 8:05:00 am 5 min No No Yes BPIIMASSIETS 35 Determination Cause Manually opened P34 -AV to try and ignite candles on 2nd stage LP Flare Action Taken Manually Closed P34 -AV. —NOTE: This flare volume is allocated to Meter 561, "CCP SSOV TO LP FLARE" and not to Meter 477, - -------�CCPEMER FLARE (HP)." -Tins is -the onlyflare volume for October 2o16 -not -allocated to the HPlfare--------- - Daily Volume (MSCF) 35 16-386 Controlled Blowdown 10/28/2016 3:58:00 am 4:03:00 am 5 min No No Yes BP1WOSMBO 152 Determination Cause T\C 1878 depressured after pressure check Action Taken 1878 depressurization complete 16-386 Controlled Slowdown 10/28/2016 12:24:00 pm 12:54:00 pm 30 min No No Yes BP1N(OSMBO 13 Determination Cause 1878 Valve sequence purge during start up Action Taken 1878 T/C valve sequence purge complete 16-386 Controlled Blowdown 10/28/2018 2:18:00 pm 2:23:00 pm 5 min No No Yes SP1\MASSIETS 109 Determination Cause Tandem T/C 1878 de -pressured after water wash. Action Taken Tandem T/C 1878 de-pressunzation complete. Daily Volume (MSCF) 274 16-391 Controlled Blowdown 10/29/2016 3:32:00 pm 3:37:00 pm 5 min No No Yes BP1U(OSMBO 135 Determination Cause T/C 1802 Stop given. Unit vented down to - 50psig. Flared 135 MSCFD for 5 minutes Action Taken 1802 depressuring complete Daily Volume (MSCF) 135 Total Volume (MSCF) 3780 Generated 11/02/2016 4:05:39PM Page 4 of 12 STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMMISSION FACILITY REPORT OF PRODUCED GAS DISPOSITION 1. Facility Number 0290000000 2. Facility Name PEI CCP/FFGU 3. Field PBU - EOA 4. Operator BP 5. MonthNear of Disposition November -2016 Disposition Volume MCF 20. Forproduction from multiple pools, list contribution of each pool as a percent of Total Volume. 6. Sold 857,181 Pool Name Pool Code Percent 7. Reinjected 214,489,344 PRUDHOE 640150 100.00% 8. Flared or vented 1 hour or less 3,101 9. Flared or vented more than 1 hour (see instr.) 0 10. Pilot and Purge 33,495 11. Assist Gas 0 12. Fuel gas used in lease operations. 5,689,766 13. Other (see instructions) U Official Use Only Authorization >1 hr: Safety MCF 14. TOTAL VOLUME (ITEMS 6-12) 221,072,887 Lease Use MCF 15. NGL Gas Equivalent 0 Conservation MCF 16. Purchased gas Waste: MCF 17. Transferred from: CGF 8 FSI 221,072,887 18. Transferred to: (Express as a negative #) 0 Commissioner Date 19. Remarks: Block 6: Includes Gas Sales to Alyeska Pipeline, Norgasco, Northstar and KRU; Block 12: Includes COTP Non-PBU Fuel Gas = 1,664 mscf; Block 18: Fuel Gas to LPC = 0 mscf I hereby certify that the foregoing is We and correct to the best of my knowledge. Note: All volumes must be corrected Signature _ r "`"1 Title Manager Production Taxes and Royalties Alaska to pressure of 14.65 psia and to a temperature of 60o F. Authority 20 Printed Name Diane Colley Phone (907) 564-5775 Date / AAC25.235. Form 10422 Rev. 5/2009 INSTRUCTIONS ON REVERSE SIDE Submit in Duplicate BP EXPLORATION (ALASKA) INC. PRUDHOE BAY UNIT- CENTRAL COMPRESSOR PLANT GAS FLARING INCIDENT REPORT November 2016 jUnplanned events less than or equal to 1 hour DATE TIME VOLUME DESCRIPTION OF INCIDENT & CAUSE ACTION TAKEN TO ELIMINATE CAUSE 11/10/2016 0455-0500 135 Not required for unplanned events <= 1 hr Not required for unplanned events <= 1 hr 11/15/2016 0430-0437 166 TOTAL 301 See attachments TOTAL 0 See attachments Planned events less than or equal to 1 hour DATE TIME VOLUME DESCRIPTION OF INCIDENT & CAUSE ACTION TAKEN TO ELIMINATE CAUSE 11/1/2016 0908-0913 408 See attachments See attachments 11/1/2016 1158-1203 109 11/5/2016 0415-0430 987 11/6/2016 0118-0133 681 11/6/2016 1400-1405 141 11/12/2016 2225-2230 200 11/12/2016 2230-2240 106 11/13/2016 0325-0335 27 11/25/2016 0020-0025 141 TOTAL 2,800 ffe]lr10iT4 See attachments TOTAL 0 ACTION TAKEN TO I See attachments Page 1 12/15/2016 12:31 PM BP EXPLORATION (ALASKA) INC. Page 2 PRUDHOE BAY UNIT - CENTRAL COMPRESSOR PLANT GAS FLARING INCIDENT REPORT November 2016 12/15/2016 12:31 PM TOTAL Unplanned Events < 1 Hour 301 Unplanned Events > 1 Hour 0 Planned Events < 1 hour and not 2,800 exceeding 5,000 MCF Planned Events> 1 hour or 0 exceeding 5,000 MCF Pilot Purge 33,495 Assist 0 TOTAL FLARED VOLUME 36,596 12/15/2016 12:31 PM STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMMISSION FACILITY REPORT OF PRODUCED GAS DISPOSITION 1. Facility Number 0290000000 2. Facility Name PBU CCP/FFGU 3. Field PBU - EOA 4. Operator BP 5. MonthNear of Disposition December -2016 Disposition Volume MCF 20. Forproduction from multiple pools, list contribution of each pool as a percent of Total Volume. 6. Sold 956,383 Pool Name Pool Code Percent 7. Reinjected 221,240,978 PRUDHOE 640150 100.00% 8. Flared or vented 1 hour or less 439 9. Flared or vented more than 1 hour (see instr.) 0 10. Pilot and Purge 34,786 11. Assist Gas 0 12. Fuel gas used in lease operations. 6,064,677 13. Other (see instructions) 0 Official Use Only Authorization >1 hr: Safety MCF 14. TOTAL VOLUME (ITEMS 6.12) 228,299,263 Lease Use MCF 15. NGL Gas Equivalent 0 Conservation MCF 16. Purchased gas 0 Waste: MCF 17. Transferred from: CGF & FS1 228,299,263 18. Transferred to: (Express as a negative #) 0 Commissioner Date 19. Remarks: Block 6: Includes Gas Sales to Alyeska Pipeline, Norgasco, Northstar and KRU; Black 12: Includes COTP Non-PBU Fuel Gas = 1,246 mscf; Block 18: Fuel Gas to LPC = 0 mscf I hereby certify that tthhe� foregoing is We and correct to the best of my knowledge. Note: All volumes must be corrected Signature ��.G1 rt Title Manager Production Taxes and Ra alties Alaska I to pressure of 14.65 psis and t0 a temperature of 60o F. Authority 20 Printed Name Diane ColleyPhone (907) 564-5775 Date AAC25.235. Form 10-422 Rev. 512009 INSTRUCTIONS ON REVERSE SIDE Submit in Duplicate BP EXPLORATION (ALASKA) INC. PRUDHOE BAY UNIT- CENTRAL COMPRESSOR PLANT GAS FLARING INCIDENT REPORT December 2016 Unplanned events less than or equal to 1 hour DATE TIME VOLUME DESCRIPTION OF INCIDENT & CAUSE ACTION TAKEN TO ELIMINATE CAUSE Not required for unplanned events <= 1 hr Not required for unplanned events <= 1 hr TOTAL 0 DATE TIME DESCRIPTION OF INCIDENT & CAUSE ACTION TAKEN TO ELIMINATE CAUSE See attachments See attachments TOTAL 0 Planned events less than or equal to 1 hour DATE TIME VOLUME DESCRIPTION OF INCIDENT & CAUSE ACTION TAKEN TO ELIMINATE CAUSE 12/1/2016 1646-1651 135 See attachments See attachments 12/2/2016 2055-2100 6 12/18/2016 0210-0215 135 12/18/2016 0400-0405 14 12/27/2016 1945-1950 135 12/27/2016 2120-2125 14 TOTAL 439 Planned events greater than 1 hour DATE TIME VOLUME DESCRIPTION OF INCIDENT & CAUSE ACTION TAKEN TO ELIMINATE CAUSE See attachments See attachments TOTAL 0 TOTAL Unplanned Events < 1 Hour 0 Unplanned Events> 1 Hour 0 Planned Events < 1 hour and not 439 exceeding 5,000 MCF Planned Events> 1 hour or 0 exceeding 5,000 MCF Pilot Purge 34,786 Assist 0 TOTAL FLARED VOLUME 35,225 Page 1 1/12/2017 2:11 PM Flare Start Date 12/01/2016 Flare End Date 12/31/2016 CCP Flare Report Total Volume (MSCF) 439 Report Numbs System Date Start Time Stop Time Duration Intennittent Black Smoke Planned Reported By Volume 16-447 Controlled Blowdown 12/01/2016 4.46.00 pm 4:51:00 pm 5min No No Yes BP1\TOWNER 135 Determination Cause 1804 T/C S/D for oil leak repair on 92 bearing housing. Action Taken 1804 T/C vented down to 50psig, Daily Volume (MSCF) 135 16-448 Controlled Blowdown 12/02/2016 8:55:00 pm 9:00:00 pm 5 min No No Yes BP1\CLEMENC 6 Determination Cause 1804 T/C S/D for oil leak repair on #2 bearing housing, unit was blown down to 0 psi for unit to be isolated. Unit was holding 50 psi from a previous shut -down. Action Taken T/C 1804 depressurization complete from 50 psi. Daily Volume (MSCF) 6 16-464 Controlled Blowdown 12/18/2016 2:10:00 am 2:15:00 am 5 min No No Yes BP1\MANGMM 135 Determination Cause IRC 1802 shutdown for planned maintenance Action Taken T/C 1802 depressurized and shut down. 16-464 Contmlled Blowdown 12/18/2016 4:00:00 am 4:05:00 am 5 min No No Yes SP11GAMBHO 14 Determination Cause Shut down T/C 1802 spin cool and de -pressured from crank pressure to 0 prig. Action Taken T/C 1802 de-pressudzation complete. Daily Volume (MSCF) 149 16-480 Controlled Blowdown 12/27/2016 7:45:00 pm 7:50:00 pm 5 min No No Determination Cause -RC 1807 shutdown for planned maintenance Action Taken 1807 depressurization complete 16-480 Controlled Blowdown 12/27/2016 9:20:00 pm 9:25:00 pm 5 min No No Determination Cause T/C 1807 shut down from spin cool and depressured from crank pressure to 0 prig. Action Taken T/C 1807 depressurization complete. Yes BP1\KOSMBO 135 Yes BP7\GAMSHO 14 Daily Volume (MSCF) 149 Total Volume (MSCF) 439 Generated 01/05/2017 1:53:25PM Page 1 of 10