STATE OF ALASKA
ALASKA OIL AND GAS CONSERVATION COMMISSION
FACILITY REPORT OF PRODUCED GOS niSpnciTinti
1. Facility Number 2. Facility Name
0290000032 PBU GC 2
Disposition
3. Field
PBU - WOA
Volume MCF
4. Operator 5. MonthNear of Disposition
BP I January -2016
20. For production from multiple pools, list contribution of each pool as a percent of
Total Volume.
6. Sold
0
Pool Name Pool Code Percent
7. Reinjected
O
PRUDHOE 640150 93,99%
AURORA 640120 2.29%
8. Flared or vented 1 hour or less
449
BOREALIS 640130 2.84
ORION 640135 0.34%
9. Flared or vented more than 1 hour (see matt.)
O
POLARIS 640160 0.54
10. Pilot and Purge
28,479
11. Assist Gas
O
12. Fuel gas used in lease operations.
719,232
13. Other (see instructions)
0
Official Use Only
Authorization>i hr:
Safety
MCF
14. TOTAL VOLUME (ITEMS 6-12)
748,160
Lease Use
MCF
15. NGL Gas Equivalent
0
Conservation
MCF
16. Purchased gas
0
Waste:
MCF
17. Transferred from:
0
18. Transferred to: (Express as a negative #) CGF
-20,972,723
Commissioner Date
19. Remarks:
I hereby certify that the foregoing is true and correct to the best of my knowledge.
Signature dw Note: All volumes must be corrected
Title Manager Production Taxes and Ro allies Alaska to pressure of 14.65 psia and to a
temperature of 60o F. Authority 20
Printed Name Diane Colley Phone (907) 564-5775 Date AAC25.235.
Form 10-422 Rev, 5/2009 INSTRUCTIONS ON REVERSE SIDE Submit in Duplicate
BP EXPLORATION (ALASKA) INC.
PRUDHOE BAY UNIT - GC -2
GAS FLARING INCIDENT REPORT
January 2016
Unplanned Events less than or equal to 1 hour
DATE TIME VOLUME DESCRIPTION OF INCIDENT & CAUSE ACTION TAKEN TO ELIMINATE CAUSE
1/27/2016 0325-0350 347 Not required for unplanned events <= 1 hr Not required for unplanned events <= 1 hr
TOTAL 347
Unplanned Events greater than 1 hour
DATE TIME VOLUME DESCRIPTION OF INCIDENT & CAUSE ACTION TAKEN TO ELIMINATE CAUSE
See Attachments See Attachments
TOTAL 0
Planned Events Less Than or Equal 1 Hour AND <= 5,000 mcf
DATE TIME VOLUME DESCRIPTION OF INCIDENT& CAUSE ACTION TAKEN TO ELIMINATE CAUSE
1/17/2016 1140-1155 102 See Attachments See Attachments
TOTAL 102
Planned Events Exceeding 1 Hour OR > 5,000 mcf
DATE TIME VOLUME DESCRIPTION OF INCIDENT & CAUSE ACTION TAKEN TO ELIMINATE CAUSE
See Attachments See Attachments
TOTAL 0
Page 7
2/12/2016
2:27 PM
TOTAL
Unplanned Events < 1 Hour
347
Unplanned Events > 1 Hour
0
Planned Events < 1 hour and not
102
exceeding 5,000 MCF
Planned Events> 1 hour or
0
exceeding 5,000 MCF
Pilot Purge
28,479
Assist
0
TOTAL FLARED VOLUME
28,928
Page 7
2/12/2016
2:27 PM
STATE OF ALASKA
ALASKA OIL AND GAS CONSERVATION COMMISSION
FACILITY REPORT OF PRODUCED GAS DISPOSITION
1. Facility Number
0290000032
2. Facility Name
PB GC 2
3. Field
PBU - WOA
4. Operator
BP
5. Month/Year of Disposition
February -2016
Disposition
Volume MCF
20. For production from multiple pools, list contribution of each pool as a percent of
Total Volume.
6. Sold
0
Pool Name Pool Code Percent
7. Reinjected
0
PRUDHOE 640150 92.82%
AURORA 640120 2.45%
8. Flared or vented 1 hour or less
80
BOREALIS 640130 3.12%
ORION 640135 0.88%
9. Flared or vented more than 1 hour (see instr.)
0
POLARIS 640160 0.73%
10. Pilot and Purge
27,879
11, Assist Gas
0
12. Fuel gas used in lease operations.
708,828
Other (see instructions)
0
Official Use Only13.
Authorization>1 he
Safety
MCF
14. TOTAL VOLUME (ITEMS 6-12)
736787
Lease Use
MCF
15, NGL Gas Equivalent
0
Conservation
MCF
16. Purchased gas
0
Waste:
MCF
17. Transferred from:
0
18. Transferred to: (Express as a negative #) CGF
-20,401,616
Commissioner Date
19. Remarks:
I hereby certify that the foregoing is true and correct to the best of my knowledge.
/1,
Signature (-,i Title Manager Production Taxes and Royalties Alaska
Note: All volumes must be corrected
to pressure of 14.65 psia and to a
temperature of 60o F. Authority 20
AAC25.235.
Printed Name Diane Colley Phone (907) 564-5775 Date /
Form 10-422 Rev. 512009 INSTRUCTIONS ON REVERSE SIDE Submit in Duplicate
BP EXPLORATION (ALASKA) INC.
PRUDHOE BAY UNIT - GC -2
GAS FLARING INCIDENT REPORT
February 2016
jUnplanned Events less than or equal to 1 hour
DATE TIME VOLUME DESCRIPTION OF INCIDENT & CAUSE ACTION TAKEN TO ELIMINATE CAUSE
2/12/2016 1432-1449 80 Not required for unplanned events <= 1 hr Not required for unplanned events <= 1 hr
TOTAL 80
nluli
See Attachments
See Attachments
TOTAL 0
Planned Events Less Than or Equal 1 Hour AND <= 5,000 mcf
DATE TIME VOLUME DESCRIPTION OF INCIDENT & CAUSE ACTION TAKEN TO ELIMINATE CAUSE
See Attachments See Attachments
TOTAL 0
Planned Events Exceeding 1 Hour OR > 5,000 mcf
DATE TIME VOLUME DESCRIPTION OF INCIDENT & CAUSE ACTION TAKEN TO FLIMINATF CAUSF
Unplanned Events < 1 Hour
Unplanned Events> 1 Hour
Planned Events < 1 hour and not
exceeding 5,000 MCF
Planned Events> 1 hour or
exceeding 5,000 MCF
Pilot Purge
Assist
TOTAL FLARED VOLUME
TOTAL 0
TOTAL
80
0
0
0
27,879
0
27,959
See Attachments
See Attachments
Page 8
3/11/2016
3:27 PM
STATE OF ALASKA
ALASKA OIL AND GAS CONSERVATION COMMISSION
FACILITY REPORT OF PRODUCED GAS DISPOSITION
1. Facility Number
0290000032
2. Facility Name
PBU GC 2
3. Field
PBU - WOA
4. Operator •5.
BP
MonthlYear of Disposition
March -2016
Disposition
Volume MCF
20. For production from multiple pools, list contribution of each pool as a percent of
Total Volume.
6. Sold
O
Pool Name Pool Code Percent
7. Reinjected
O°
PRUDHOE 640150 92.68
AURORA 640120 1.99%
8. Flared or vented l hour or less
618
BOREALIS 640130 3.19%
ORION 640135 1.08%
9. Flared or vented more than 1 hour (see instr.)0
POLARIS 640160 1.06%
10. Pilot and Purge
28,660
11. Assist Gas
0
12. Fuel gas used in lease operations.
581,348
13. Other (see instructions)
O
OMdei Use Only
Authorization >1 hr:
Safety
MCF
14. TOTAL VOLUME (ITEMS 6-12)
610,626
Lease Use
MCF
15, NGL Gas Equivalent
0
Conservation
MCF
16. Purchased gas
0
Waste:
MCF
17. Transferred from.
0
Commissioner Date
[;;;;;;
18. Transferred to: (Express as a negative #) CGF
-
-19,789,088
19. Remarks:
I hereby certify that the foregoing is true and correct to the best of my knowledge.
^�-�^�- Note: All volumes must be corrected
Signatur-�l�l.C-.�L4�1 Title Mana er Production Taxes and Ro alties Alaska to pressure of 14.65 psis and to a
temperature of 60o F. Authority 20
Printed Name Diane Colley Phone (907) 564-5775 Date AAC25.235.
Form 10-422 Rev, 5/2009 INSTRUCTIONS ON REVERSE SIDE Submit in Duplicate
BP EXPLORATION (ALASKA) INC.
PRUDHOE BAY UNIT - GC -2
GAS FLARING INCIDENT REPORT
March 2016
junplanneo events less than or equal to 1 hour
DATE PTIO T &CAU CAUSE
TIME VOLUME DESCRfPTION OF INCIDENT &CAUSE ACTION TAKEN TO ELIMINATE CAUSE
3/6/2016 2238-2249 82 Not required for unplanned events <= 1 hr Not required for unplanned events <= 1 hr
3/11/2016 1421-1433 50
3/12/2016 1922-1942 486
TOTAL 618
TOTAL
or equal to 1 hour
TOTAL
TOTAL
Unplanned Events < 1 Hour
Unplanned Events> 1 Hour
Planned Events < 1 hour and not
exceeding 5,000 MCF
Planned Events> 1 hour or
exceeding 5,000 MCF
Pilot Purge
Assist
TOTAL FLARED VOLUME
A
Cr]
A
TOTAL
618
0
0
0
28,660
0
29,278
See Attachments
See Attachments
See Attachments
See Attachments
See Attachments
See Attachments
Page 7
4/14/2016
1:52 PM
STATE OF ALASKA
ALASKA OIL AND GAS CONSERVATION COMMISSION
FACILITY REPORT OF PRODUCED GAS DISPOSITION
1. Facility Number
0290000032
2. Facility Name
PBU GC 2
3. Field
PBU - WOA
4. Operator
BP
5. MonthNear of Disposition
I Aril -2016
Disposition
Volume MCF
20. For production from multiple pools, list contribution of each pool as a percent of
Total Volume.
6. Sold
Pool Name Pool Code Percent
7. Reinjected
O
PRUDHOE 640150 92.76%
AURORA 640120 2.23%
8. Flared or vented 1 hour or less41,667
BOREALIS 640130 3.22%
ORION 640135 1.12%
9. Flared or vented more than 1 hour (see instr.)
98,203
POLARIS 640160 0.67%
10. Pilot and Purge
28,030
11. Assist Gas
D
12. Fuel gas used in lease operations.
643,292
13. Other (see instructions)
U
Official Use Only
Authorization >1 hr:
Safety
952 03
MCF
14. TOTAL VOLUME (ITEMS 6-12)
$11,192
Lease Use
MCF
15. NGL Gas Equivalent
0
Conservation
MCF
16. Purchased gas
D
Waste:
MCF
17. Transferred from:
0
/ '
18. Transferred to: (Express as a negative #) CGF
-18,619,913
Commissioner Date
19. Remarks:
I hereby certify that the foregoing is true and correct to the best of my knmiedge.
///�� M/J���/ Note: All volumes must be corrected
Signature 9 t K Ct[ru!JN/ Title Manager Production Taxes and Ro alties Alaska to pressure of 14.65 psia and to a
temperature of 60o F. Authority 20
Printed Name Diane Colleyl Phone (907) 564-5775 Dale f / AAC25.235.
Form 10-422 Rev. 5/2009 INSTRUCTIONS ON REVERSE SIDE Submit in Duplicate
BP EXPLORATION (ALASKA) INC.
PRUDHOE BAY UNIT - GC -2
GAS FLARING INCIDENT REPORT
April 2016
Page 11
Unplanned events less than or equal to 1 hour
DATE TIME
VOLUME
DESCRIPTION OF INCIDENT & CAUSE
ACTION TAKEN TO ELIMINATE CAUSE
4/4/2016 1022-1028
41,667
Not required for unplanned events <= 1 hr
Not required for unplanned events <= 1 hr
TOTAL
41,667
Unplanned events greater than 1 hour
DATE TIME
VOLUME
DESCRIPTION OF INCIDENT & CAUSE
ACTION TAKEN TO ELIMINATE CAUSE
4/24/2016 0630-1800
37,600
See Attachments
See Attachments
4/25-26/2016 0130-0105
60,603
TOTAL
98,203
Planned events less than or equal to 1 hour
DATE TIME
VOLUME
DESCRIPTION OF INCIDENT & CAUSE
ACTION TAKEN TO ELIMINATE CAUSE
See Attachments
See Attachments
TOTAL
0
Planned events greater than 1 hour
DATE TIME
VOLUME
DESCRIPTION OF INCIDENT & CAUSE
ACTION TAKEN TO ELIMINATE CAUSE
See Attachments
See Attachments
TOTAL
0
TOTAL
Unplanned Events < 1 Hour
41,667
Unplanned Events> 1 Hour
98,203
Planned Events < 1 hour and not
0
exceeding 5,000 MCF
Planned Events > 1 hour or
0
exceeding 5,000 MCF
Pilot Purge
28,030
Assist
0
TOTAL FLARED VOLUME
167,900
5/16/2016
144 PM
Link, Liz M (DOA)
From: AK, OPS PCC EOC TL <AKOPSPCCEOCTL@bp.com>
Sent: Saturday, April 09, 2016 8:14 AM
To: AOGCC Reporting (DOA sponsored)
Cc: Loepp, Victoria T (DOA); Benson, Gary A; Arthur, Gregory; AK, OPS GC3&PCC OSM;
Borton, Kim; AK, HSSEE Env Adv West; Glover, Robin; Kain, Rachel B; AK, OPS GC2
Facility OTL; AK, OPS GC2 OSM
Subject: Flaring Event at GC2
To: AOGCC Reporting CC: Victoria Loepp, AOGCC
Aogcc. reporting(aalaska.gov Victoria. loeppaalaska.gov
From: David Spall, GPB Production Optimization Team Leader
A flaring event occurred at GC2 starting at 04/04/2016 10:22 and stopping at 04/04/2016 10:28 with a volume
of 41667 (MSCF). The event lasted 6 minutes. The event was due to high gas transit line pressure caused by
CCP compressor problems. This flaring event stopped when WOA immediately reduced production rates and
shut-in wells.
Thanks
David Spall
PCC/EOC Production Optimization Team Lead (Alt Jennifer Blake)
Office 907-659-4472
Cell 219-689-4036
David.spall@bp.com
Link, Liz M (DOA)
From: AK, OPS PCC EOC TL <AKOPSPCCEOCTL@bp.com>
Sent: Thursday, May 05, 2016 9:37 AM
To: AOGCC Reporting (DOA sponsored)
Cc: Loepp, Victoria T (DOA); Benson, Gary A; Arthur, Gregory; AK, OPS GC3&PCC OSM;
Borton, Kim; AK, HSSEE Env Adv West; Glover, Robin; Kain, Rachel B; AK, OPS GC2
Facility OTL; AK, OPS GC2 OSM
Subject: Flaring Event at GC2
To: AOGCC Reporting CC: Victoria Loepp, AOGCC
Aoacc. reportinga-alaska. aov Victoria. loepp(a.a laska. aov
From: David Spall, GPB Production Optimization Team Leader
A flaring event occurred at GC2 starting at 04/24/2016 06:30 and stopping at 04/24/2016 18:00 with a volume
of 37600 (MSCF). The event lasted 690 minutes. The event was due to Field wide power outage, caused stop
production and relief to flare.. This flaring event stopped when Plant de -pressured to safe state with no
incoming production. Wells were Shut-in.
A flaring event occurred at GC2 starting at 04/25/2016 01:30 and stopping at 04/25/2016 24:00 with a volume
of 59700 (MSCF). The event lasted 1350 minutes. The event was due to field wide power outage. Plant relief
to flare. Prior to bringing rate into plant assist gas used to keep flares clean. K7000 start up copus to flare..
This flaring event is ongoing into next day, Wells Shut-in and Freeze protected across the field.
A flaring event occurred at GC2 starting at 04/26/2016 00:00 and stopping at 04/26/2016 01:05 with a volume
of 903 (MSCF). The event lasted 65 minutes. The event was due to Plant start up, flare off LP K/O (with assist
gas) prior to getting enough gas to start LP and IP compressors. This flaring event stopped when Plant up and
running, LP and IP compressors up and running.
Thanks
David Spall
PCC/EOC Production Optimization Team Lead (Alt Jennifer Blake)
Office 907-659-4472
Cell 219-689-4036
David.spall@bp.com
STATE OF ALASKA
ALASKA OIL AND GAS CONSERVATION COMMISSION
FACILITY REPORT OF PRODUCED GAS DISPOSITION
1. Facility Number2.
0290000032
Facility Name
PBU GC 2
3. Field
PBU - WOA
4. Operator
BP
5. Monthtyear of Disposition
I May -2016
Disposition
Volume MCF
20. For production from multiple pools, list contribution of each pool as a percent of
Total volume.
6. Sold
0
Pool Name Pool Code Percent
7. Reinjected
O
PRUDHOE 640150 90.03%
AURORA 640120 3.48%
8. Flared or vented 1 hour or less
O
BOREALIS 640130 3.86%
ORION 640135 1.62%
9. Flared or vented more than 1 hour (see instr.)
609
POLARIS 640160 1.01%
10. Pilot and Purge
30,443
11. Assist Gas
0
12. Fuel gas used in lease operations.
614,731
13. Other (see instructions)
0
Official Use Only
Authorization >1 hr:
Safety
p
MCF
14. TOTAL VOLUME (ITEMS 8-12)
645,763
Lease Use
MCF
15. NGL Gas Equivalent
0
Conservation
MCF
16. Purchased gas
Waste:
MCF
17. Transferred from:
0
/0'v"[r/— 7-2.1—/(.
/uatee
CommissionerD
18. Transferred to: (Express as a negative #) CGF
-13,686,070
19. Remarks:
I hereby certify that !0a foregoing is true and correct to the best of my knowledge.
Note: All volumes must be corrected
Signature. Title Manager Production razes and Rallies Alaska
o to pressure of 14.65 psia and to a
"/5temperature of 60o F. Authority 20
Printed Name Diane Colley Phone (907) 564-5775 Date AAC25.235.
VT-L-
-T/1
TL
-Tl15 /!b
Form 10-422 Rev. 512009 INSTRUCTIONS ON REVERSE SIDE Submit in Duplicate
events
BP EXPLORATION (ALASKA) INC,
PRUDHOE BAY UNIT - GC -2
GAS FLARING INCIDENT REPORT
May 2016
or
Not required for unplanned events <= 1 hr
TOTAL 0
Unplanned events greater than 1 hour
5/20/2016
Unplanned Events < 1 Hour
Unplanned Events > 1 Hour
Planned Events < 1 hour and not
exceeding 5,000 MCF
Planned Events > 1 hour or
exceeding 5,000 MCF
Pilot Purge
Assist
TOTAL FLARED VOLUME
See Attachments
TOTAL 0
See Attachments
TOTAL 0
1447-1609 609 See Attachments
TOTAL 609
TOTAL
0
0
0
609
30,443
0
31,052
Page 8
Not required for unplanned events <= 1 hr
See Attachments
See Attachments
See Attachments
6/15/2016
2:44 PM
Link, Liz M (DOA)
From: AK, OPS PCC EOC TL <AKOPSPCCEOCTL@bp.com>
Sent: Tuesday, May 24, 2016 11:30 AM
To: AOGCC Reporting (DOA sponsored)
Cc: Loepp, Victoria T (DOA); Benson, Gary A; Arthur, Gregory; AK, OPS GC3&PCC OSM;
Borton, Kim; AK, HSSEE Env Adv West; Glover, Robin; Kain, Rachel B; AK, OPS GC2
Facility OTL; AK, OPS GC2 OSM
Subject: Flaring Event at GC2
To: AOGCC Reporting CC: Victoria Loepp, AOGCC
Aogcc.reporting(a alaska.gov Victoria.loepp(a)alaska.gov
From: Jennifer Blake, GPB Production Optimization Team Leader
A flaring event occurred at GC2 starting at 05/20/2016 14:47 and stopping at 05/20/2016 16:09 with a volume of 609
(MSCF). The event lasted for 82 minutes. The event was due to LPS compressor K-7001 Spring water wash. This flaring
event stopped when the water wash was finished.
Thanks
Jennifer Blake
PCC/EOC Production Optimization Team Lead (alt David Spall)
Office (907) 659-4472
Cell (907) 830-6204
Jennifer. blake@bp.com
Flare Start Date 05/01/2016
Flare End Date 05/31/2016
GC2 Flare Report
Total Volume (MSCF)
609
Report
Numbs System Date Start Time
Stop Time Duration Intermittent
Black Smoke Planned Reported By
Volume
16-166 Flare Relief 05/20/2016 2:47:00 pm
4:09:00 pm 62 min No
No Yes BP1\STYVJW
609
Determination Cause LPS compressor k-7001 Spring water wash.
Action Taken Done with water wash.
Daily Volume (MSCF)
609
Total Volume (MSCF)
609
Generated 06/07/2016 4:33:28PM Page 8 of 9
STATE OF ALASKA
ALASKA OIL AND GAS CONSERVATION COMMISSION
FACILITY REPORT OF PRODUCED GAS DISPOSITION
1. Facility Number2.
0290000032
Facility Name
PBU GC 2
3. Field
PBU - WOA
4. Operator
BP
5. MonthlYear of Disposition
I June -2016
Disposition
Volume MCF
20. For production from multiple pools, list contribution of each pool as a percent of
Total Volume.
6. Sold
0
Pool Name Pool Code Percent
7. Reinjected
0
PRUDHOE 640150 94.30%
AURORA 640120 2.230/6
8. Flared or vented 1 hour or less
1,854
BOREALIS 640130 2.23%
ORION 640135 0.81%
9. Flared or vented more than 1 hour (see instr.)
15,871
POLARIS 640160 0.69%
10. Pilot and Purge
31,266
11. Assist Gas
0
12. Fuel gas used in lease operations.
541,467
13. Other (see instructions)
G
Official Use Only
Authorization >1 hr
Safety
MCF ✓ �
14. TOTAL VOLUME (ITEMS 6-12)
590,458
Lease Use
MCF
15. NGL Gas Equivalent
0
Conservation
MCF
16. Purchased gas
Q
Waste:
MCF
17. Transferred from:
0
18. Transferred to: (Express as a negative #) CGF
-17,626,003
Commissioner Date
19. Remarks:
I hereby certify that the foregoing is true and conect to the best of my knowledge.
Note: All volumes must be corrected
Signature Title Mana er Production Taxes and Royalties Alaska to pressure of 14.65 psis and to a
temperature of 60o F. Authority 20
Printed Name Diane Colley Phone (907) 564-5775 Date l $ Z, q AAC25.235.
Form 10-422 Rev. 512009 INSTRUCTIONS ON REVERSE SIDE Submit in Duplicate
BP EXPLORATION (ALASKA) INC.
PRUDHOE BAY UNIT- GC -2
GAS FLARING INCIDENT REPORT
June 2016
Page 8
unplanned events less than or equal to 1 hour
DATE TIME VOLUME DESCRIPTION OF INCIDENT & CAUSE ACTION TAKEN TO ELIMINATE CAUSE
6/11/2016 2048-2127 1,354 Not required for unplanned events <= 1 hr Not required for unplanned events <= 1 hr
TOTAL 1,354
UAIE TIME
VOLUME DESCRIPTION OF INCIDENT & CAUSE
ACTION TAKEN TO ELIMINATE CAUSE
6/28/2016 0000-0300
3,625 See Attachments
See Attachments
6/28/2016 1040-2130
11,736
TOTAL
15,361
Planned events less than or equal to 1 hour
DATE TIME
VOLUME DESCRIPTION OF INCIDENT & CAUSE
ACTION TAKEN TO ELIMINATE CAUSE
6/4/2016 0830-0845
500 See Attachments
See Attachments
TOTAL
500
6/27/2016
Unplanned Events < 1 Hour
Unplanned Events > 1 Hour
Planned Events < 1 hour and not
exceeding 5,000 MCF
Planned Events > 1 hour or
exceeding 5,000 MCF
Pilot Purge
Assist
TOTAL FLARED VOLUME
0000-0320 510 See Attachments
TOTAL 510
TOTAL
1,354
15,361
500
010,
31,266
0
48,991
ACTION TAKEN TO E
See Attachments
7/18/2016
3:41 PM
flare StartDate 06/01/2016
Flare End Date 06/30/2016
GC2 Flare Report
Total Volume (MSCF) 17725
Report
Numbe System Date Start Time Stop Time Duration Intermittent Black Smoke Planned Reported By Volume
16-181 Flare Relief 05/04/2016 8:30:00 am 8:45:00 am 15 min No No Yes BPIISQUIP2 500
Determination Cause De -pressuring N pad LDF through D bank slugcatcher to facilitate valve changes on the pad
Action Taken Planned de -pressure of LDF volume complete
_
Daily Volume (MSCF) 500
16-223 Flare Relief 06/27/2016 12:00:00 am 3:20:00 am 200 min No No
Determination Cause Startup, flaring prior to startup of LP & IP & LPS compressors
Action Taken Gas rates raised to minimum required for compressor starts, compressors started up.
16-225 Flare Relief 06/28/2016 12:00:00 am 3:00:00 am 180 min No No
Determination Cause K206 & K208 LP/IP compressors can't move gas at low gas rates during plant startup
Action Taken Rates raised to allow LP/IP compressors in service
16-225 Flare Relief 06/28/2016 10:40:00 am 9:30:00 pm 650 min No No
Determination Cause Plant startup, high ambient temps and low gas rates, LP & IP compressor won't bite
Action Taken Raised gas rates, start up issues delayed raising rates for most of the day
Generated 07/06/2016 1:44:03PM
Yes BPlMU1P2 510
Daily Volume (MSCF) 510
No BP1\SQUIP2 3625
No 8PIISQUIP2 11736
Daily Volume (MSCF) 15361
Total Volume (MSCF) 17725
Page 10 of 11
wou q ajelq•ja;!uuar
bOZ9-0£8(L06)IlaJ
9Z6S-b9S (L06) aa190
peal weal uo!lez!w!ld0 uo!lanpad 003
avle zafiuuar
sluegl
enol; pae vuo; ys!Igelsa-aj 01 vossaadwoo dl/dl ayl jo; ydnoua Jueld ayl of 13eq
sale] sed uaym paddols Ju ue{ aainaas ui u!ewaa o1 sed d u p!p s.iossa,idwou dl/dl 'TOSd wa}
aull l!sueal l!o aql uo ainssa Uel sa nuiw 0£T ao; palsel Juana agl'(30SW)
q o awnlon a ql!M Ob:OT 9TOZ/£0/LO Je dulddols pue OE:80 9TOZ/£0/LO le du!ljels Z09 le paiin000 luana U.
•Aep
aql to lsow jo; sales aql du!slei paAelap panss! dnlaelS 'pas!ej wam sale] sed uaym paddols Juana dulJel; s!ql dnliels
lueld duunp sale] sed enol pue sdwal Jua!gwe qd!q o1 anp seen pue salnu!w OS9 Jo; palsel Juana a4l'(30SW)
9ELTT10 awnlon a y1!m 0£:TZ 9TOZ/8Z/901e dulddols pue Ob:OT 91OZ/8Z/901e du!liels Z09 le pajan»o Juana du!jel; V
,a:)!Aaas ui u!ewaa 01 aossa.idwo:)
aql jo; paa!nbai wnw!u!w aql of pas!ej ajam sales sed du!wooui uagm paddols Juana duueg s!ql •dnlaels lueld duunp
sjossajdwoa dl IS dl agl 01 sale] sed Mol Aq pasneo du!aep of anp seen pue salnu!w OST Jo; palsel Juana agl'(3JSW)
SZ9E;o awnlon a gl!m 00:EO 9TOZ/8Z/901e dulddols pue 0000 9TOZ/8Z/9012 du!Jae1s Z:)91e pajinmo Juana duuel; V
•dn paJuels aossaidwoa
aql pue spels jossaidwo:) jo; paj!nbaj wnwlulw aql of pas!ei sale] sed du!wo3ui uaym paddols Juana dupel;
s!ql siossaidwo:) Shc pue dl 'dl aql;o dnljels of jo!ad guijelj of anp sem pue salnuiw OOZ Jo; palsel Juana ayl'(30SVI)
OTS ;o awnlon a OPO OZ:£0 91OZ/LZ/90 le dulddols pue 0000 9TOZ/LZ/90 le dulliels Z091e paaanoao Juana SUIMIJ V
japeal weal uollez!w!1d0 uo!lonpwd 9d9'alelg aa;!uuaf :wa3
Ao •eNsele aol-elJO1O1A no E! !sele V b uffpo aroo 156V
009OV 'ddaol ePOPA :00 bulliodaa OOJOV :ol
Z99 le sJu9n3 6uuely
:laafgn5
WSO ZD9 SdO')IV'll0 AJ!l!oey
Zl9 SdO 'NV 'V lagged 'aaq:png 'u!goa 'Jano19'1saM APV Au3 33SSH 'SIV :wl)t 'uoJjog
WSO DD&PED9 SdO ')IV 'Ajo6aa9 'angvV :V Aie9 'uosuag '(VOO) l elaoJa!A 'ddeol
(paaosuods VO(]) 6u!Jrodab DD90V
:01
Wd bb:ZT 9TOZ'LO Aln('Aepsjngi
:Juas
<woa dq@n 11103»dSdO)IV> ll l03 OOd SdO'dV
:woj3
(VO(l) W z)l ';lull
STATE OF ALASKA
ALASKA OIL AND GAS CONSERVATION COMMISSION
FACILITY REPORT OF PRODUCED GAS DISPOSITION
1. Facility Number
0290000032
2. Facility Name
PBU GC 2
3. Field
PBU - WOA
4, Operator
BP
5. MonthtYear of Disposition
July -2016
Disposition
Volume MCF
20. For production from multiple pools, list contribution of each pool as a percent of
Total Volume.
6. Sold
Pool Name Pool Code Percent
7. Reinjected
O
PRUDHOE 640150 95.76%
AURORA 640120 1.82%
8. Flared or vented 1 hour or less
2,479
BOREALIS 640130 1.41%ORION
640135 0.22%
9. Flared or vented more than 1 hour (see instr.)
23,930
POLARIS 640160 0.79%
10. Pilot and Purge
31,931
11. Assist Gas
0
12. Fuel gas used in lease operations.
621,707
13. Other (see instructions)
O
Official Use Only
Authorization >1 hr:
Safety
,�, 3 �% 30
MCF LIT'
31
14. TOTAL VOLUME (ITEMS 6-12)
680,047
Lease Use
MCFZ
15. NGL Gas Equivalent
0
Conservation
MCF
16. Purchased gas
0
Waste:
MCF
17. Transferred from:
0
4--�
18. Transferred to: (Express as a negative #) CGF
-18,566,331
Commissioner Date
19. Remarks:
I hereby certify that
///the foregoing is truce and correct to the best of my knowledge.
/ `% Note: All volumes must be corrected
Signature_ /(� ti4l Title Manager Production Taxes and Royalties Alaska to pressure of 14.65 psia and to a
temperature of 60o F. Authority 20
Printed Name Diane Colley Phone (907) 564-5775 Date AAC25. 235,
Form 10-422 Rev. 512009 INSTRUCTIONS ON REVERSE SIDE Submit in Duplicate
BP EXPLORATION (ALASKA) INC.
PRUDHOE BAY UNIT - GC -2
GAS FLARING INCIDENT REPORT
July 2016
Unplanned events less than Or equal to 1 hour
VOLUME
DATE
TIME
VOLUME DESCRIPTION OF INCIDENT & CAUSE ACTION TAKEN TO ELIMINATE CAUSE
7/14/2016
1130-1230
1,458 Not required for unplanned events <= 1 hr Not required for unplanned events <= 1 hr
7/15/2016
0235-0241
104
7/15/2016
1120-1200
917
TOTAL
2,479
DATE TIME
VOLUME
DESCRIPTION OF INCIDENT & CAUSE
ACTION TAKEN TO ELIMINATE CAUSE
7/3/2016 0830-1140
24
See Attachments
See Attachments
7/13-14/2016 1209-0028
15,887
7/14/2016 1300-1635
4,628
7/15/2016 1230-1440
2,979
7/27/2016 1552-1740
412
TOTAL
23,930
Planned events less than or equal to 1 hour
DATE TIME
VOLUME
DESCRIPTION OF INCIDENT & CAUSE
ACTION TAKEN TO ELIMINATE CAUSE
See Attachments
See Attachments
TOTAL
0
Planned events greater than 1 hour
DATE TIME
VOLUME
DESCRIPTION OF INCIDENT & CAUSE
ACTION TAKEN TO ELIMINATE CAUSE
See Attachments
See Attachments
TOTAL
0
Unplanned Events < 1 Hour
Unplanned Events > 1 Hour
Planned Events < 1 hour and not
exceeding 5,000 MCF
Planned Events> 1 hour or
exceeding 5,000 MCF
Pilot Purge
Assist
TOTAL FLARED VOLUME
TOTAL
2,479
23,930
0
0
31,931
0
58,340
Page 7
8/11/2016
9:46 AM
Flare Start Date 07/01/2016
Flare End Date 07/31/2016
GC2 Flare Report Total Volume (MSCF) 26409
Report
Numbs System
Date Start Time Stop Time Duration Intermittent Black Smoke Planned Reported By
Volume
16-229 Flare Relief 07/03/2016 8:30:00 am 10:40:00 am 130 min No No
No BPi\SEWELLC
24
Determination Cause
Plant shutdown do to hi pressure on the oil transit line from PS -1. LP/IP Compressors
did not have enough gas to pump.
Action Taken
Got enough rate back in the plant for the LP/IP compressors to pump.
16-237 Flare Relief 07/13/2016 12:09:00 pm 12:00:00 am 711 min No No
No BPi\PAOLINJM
15306
Determination Cause
High ambient temperature swings resulted in flaring and required cuts in production.
Ambient temperature up to 85 degrees.
Cuts were
made earlier today.
Action Taken
Ambient temps dropped 10 degrees allowing a start on IP and LP compressors.
16-238 Flare Relief 07/14/2016 12:01:00 am 12:28:00 am 27 min No No
No BPI\PAOLINJM
581
Determination Cause
High ambient temperature swings resulted in flaring and required cuts in production.
Ambient temperature increased to 85 degrees. This
is a continuation of yesterdays flare report.
Action Taken
IP and LP compressors to stop flaring event, ambient temps down to 68 degrees.
16-238 Flare Relief 07/14/2016 1:00:00 pm 4:35:00 on 215 min No
Determination Cause K208, compressor shutdown on high motor enclosure temp.
Action Taken Restarted Compressors
No No BP1\WALLC7 4628
16-241 Flare Relief 07/15/2016 12:30:00 pm 2:40:00 pm 130 min No No
Determination Cause K208,K206 Compressors shutdown
Action Taken Restarted Compressors
16-247 Flare Relief 07/27/2016 3:52:00 pm 5:40:00 pm 108 min Yes No
Determination Cause High ambient temperature resulted in K-206 and K-208 shutting down the compressors
Action Taken Equipment was restarted at 17:40 hours.
No BP1\WALLC7 2979
No BPI\EARLLC 412
Total Volume (MSCF) 26409
Generated 08/02/2016 11:31:35AM Page 3 of 4
Link, Liz M (DOA)
From: AK, OPS PCC EOC TL <AKOPSPCCEOCTL@bp.com>
Sent: Thursday, July 07, 2016 12:44 PM
To: AOGCC Reporting (DOA sponsored)
Cc: Loepp, Victoria T (DOA); Benson, Gary A; Arthur, Gregory; AK, OPS GC3&PCC OSM;
Barton, Kim; AK, HSSEE Env Adv West; Glover, Robin; Buckbee, Rachel A; AK, OPS GC2
Facility OTL, AK, OPS GC2 OSM
Subject: Flaring Events at GC2
To: AOGCC Reporting CC: Victoria Loepp, AOGCC
Aogcc.reporting(o)alaska.gov Victoria. Ioepp(a)alaska.gov
From: Jennifer Blake, GPB Production Optimization Team Leader
flaring event occurred at GC2 starting at 06/27/2016 00:00 and stopping at 06/27/2016 03:20 with a volume f3i0
(MS event lasted for 200 minutes and was due to flaring prior to startup of the LP, IF andLP pressors. This
flaring event stop hen incoming gas rates raised to the minimum required for compre starts and the
compressor started up.
A flaring event occurred at GC2 starting at 06/28/201 0 an ping at 06/28/2016 03:00 with a volume of 3625
(MSCF). The event lasted for 180 minutes and was duet ring ed by low gas rates to the LP & IP compressors
during plant startup. This flaring event stopped n incoming gas rates raised to the minimum required for the
compressor to remain in service.
A flaring event occurre C2 starting at 06/28/2016 10:40 and stopping at 06/28/2016 21:30volume of 11736
(MSCF). The ev asted for 650 minutes and was due to high ambient temps and low gas rates during p
startup slaring event stopped when gas rates were raised. Startup issued delayed raising the rates for most e
A flaring event occurred at GC2 starting at 07/03/2016 08:30 and stopping at 07/03/2016 10:40 with a volume of 24
(MSCF). The event lasted for 130 minutes and was due to plant shutdown due to high pressure on the oil transit line
from PS01. LP/IP compressors did not have enough gas to remain in service. This flaring event stopped when gas rates
back to the plant were high enough for the LP/IP compressors to re-establish forward flow.
Thanks
Jennifer Blake
EOC Production Optimization Team Lead
Office (907) 564-5926
Cell (907) 830-6204
Jennifer.blake@bp.com
Link, Liz M (DOA)
From: AKOpsProdEOCTL <AKOPSPCCEOCTL@bp.com>
Sent: Friday, July 15, 2016 4:24 PM
To: AOGCC Reporting (DOA sponsored)
Cc: Loepp, Victoria T (DOA); Benson, Gary A; Arthur, Gregory; AK, OPS GC3&PCC OSM;
Borton, Kim; AK, HSSEE Env Adv West; Glover, Robin; Buckbee, Rachel A; AK, OPS GC2
Facility OTL; AK, OPS GC2 OSM
Subject: Flaring Events at GC2
To: AOGCC Reporting CC: Victoria Loepp, AOGCC
Aoacc.reporting(cilalaska.gov Victoria Ioepp(o)alaska.gov
From: Jennifer Blake, GPB Production Optimization Team Leader
A flaring event occurred at GC2 starting at 07/14/2016 13:00 and stopping at 07/14/2016 16:35 with a volume of 4628
(MSCF). The event lasted for 215 minutes and was due the IP compressor, K-208, shutting down on high motor enclosure
temperature. This flaring event stopped when K-208 was restarted.
A flaring event occurred at GC2 starting at 07/13/2016 12:09 and stopping at 07/14/2016 with a volume of 15306
(MSCF). The event lasted for 711 minutes and was due the IP and LP compressors shutting down caused by high ambient
temperatures. This flaring event stopped when production was cut and ambient temperatures dropped enough to
restart the IP and LP Compressors.
Thanks,
Jennifer Blake
EOC Production Optimization Team Lead
Office (907) 564-5926
Cell(907)830-6204
Jennifer.blake@bp.com
Link, Liz M (DOA)
From: AKOpsProdEOCTL <AKOPSPCCEOCTL@bp.com>
Sent: Saturday, July 30, 2016 8:47 AM
To: AOGCC Reporting (DOA sponsored)
Cc: Loepp, Victoria T (DOA); Benson, Gary A; Arthur, Gregory; AK, OPS GC3&PCC OSM;
Borton, Kim; AK, HSSEE Env Adv West; Glover, Robin; Buckbee, Rachel A; AK, OPS GC2
Facility OTL, AK, OPS GC2 OSM
Subject: Flaring Events at GC2
To: AOGCC Reporting CC: Victoria Loepp, AOGCC
Aogcc.reoorting(aalaska.gov Victoria. loepp(a)alaska.gov
From: Jennifer Blake, GPB Production Optimization Team Leader
A flaring event occurred at GC2 starting at 07/15/2016 12:30 and stopping at 07/15/2016 14:40 with a volume of 2979
(MSCF). The event lasted for 130 minutes and was due the LP and IP compressor,K-206 and K-208, shutting down on
high motor enclosure temperature. This flaring event stopped when the compressors were restarted.
A flaring event occurred at GC2 starting at 07/27/2016 15:52 and stopping at 07/27/2016 17:40 with a volume of 412
(MSCF). The event lasted for 108 minutes and was due the IP and LP compressors, K-206 and K-208, shutting down
caused by high ambient temperatures. This flaring event stopped when the compressors were restarted.
Thanks,
Jennifer Blake
EOC Production Optimization Team Lead
Office (907) 564-5926
Cell (907) 830-6204
Jennifer.blake@bp.com
STATE OF ALASKA
ALASKA OIL AND GAS CONSERVATION COMMISSION
FACILITY REPORT OF PRODUCED GAS DISPOSITION
1. Facility Number
0290000032
2. Facility Name
PBU GC 2
3. Field --TBP
PBU - WOA
BP
5. MonthNear of Disposition
August -2016
Disposition
Volume MCF
20. Forproduction from multiple pools, list contribution of each pool as a percent of
Total Volume.
6. Sold
0
Pool Name Pool Code Percent
7. Reinjected
0
PRUDHOE 640150 96.35%
AURORA 640120 1.44%
8. Flared or vented lhour or less
1,236
BOREALIS 640130 1.22%
ORION 640135 0.27%
9. Flared or vented more than 1 hour (see instr.)
0
POLARIS 640160 0.72%
10. Pilot and Purge
32,942
11. Assist Gas
0
12. Fuel gas used in lease operations.
648,674
13. Other (see instructions)
0
Official Use Only
Authorization>1 hr:
Safety
MCF
14. TOTAL VOLUME (ITEMS 6.12)
682,852
Lease Use
MCF
15. NGL Gas Equivalent
0
Conservation
MCF
16. Purchased gas
0
Waste.
MCF
17. Transferred from:
0
18. Transferred to: (Express as a negative #) CGF
-20,223,810
Commissioner Date
19. Remarks:
I hereby certify that the foregoing is true and correct to the best of my knowledge.
��/f/�l Note: All volumes must be corrected
Signature O<(S�G`r'^ Title Manager Production Taxes and Ro allies Alaska to pressure of 14.65 psis and to a
temperature of 60o F. Authority 20
Printed Name Diane Colley Phone (907) 564-5775 Date . AAC25.235.
Form 10-422 Rev. 5/2009 INSTRUCTIONS ON REVERSE SIDE Submit in Duplicate
BP EXPLORATION (ALASKA) INC.
PRUDHOE BAY UNIT - GC -2
GAS FLARING INCIDENT REPORT
August 2016
Unplanned events less than or equal to 1 hour
TOTAL
DATE
TIME
VOLUME DESCRIPTION OF INCIDENT & CAUSE ACTION TAKEN TO ELIMINATE CAUSE
8/17/2016
1641-1648
146 Not required for unplanned events <= 1 hr Not required for unplanned events <= 1 hr
8/18/2016
1714-1803
340
8/20/2016
0024-0051
750
Pilot Purge
TOTAL
1,236
See Attachments
TOTAL 0
Planned events less than or equal to 1 hour
See Attachments
DATE
TOTAL 0
See Attachments
TOTAL 0
See Attachments
CAUSE ACTION TAKEN TO ELIMINATE CAUSE
See Attachments
See Attachments
Page 7
9/12/2016
9:44 AM
TOTAL
Unplanned Events < 1 Hour
1,236
Unplanned Events > 1 Hour
0
Planned Events < 1 hour and not
0
exceeding 5,000 MCF
Planned Events > 1 hour or
0
exceeding 5,000 MCF
Pilot Purge
32,942
Assist
0
TOTAL FLARED VOLUME
34,178
See Attachments
CAUSE ACTION TAKEN TO ELIMINATE CAUSE
See Attachments
See Attachments
Page 7
9/12/2016
9:44 AM
Flare Start Date 08/01/2016
Flare End Date 08/31/2016
GC2 Flare Report
Total Volume (MSCF) 1236
Report
Numbe System Date StartTime Stop Time Duration Intermittent Black Smoke Planned Reported By Volume
Total Volume (MSCF) 1236
Generated 09/01/2016 3'.47'.14PM Page 8 of 9
STATE OF ALASKA
ALASKA OIL AND GAS CONSERVATION COMMISSION
FACILITY REPORT OF PRODUCED GAS DISPOSITION
1. Facility Number
0290000032
2. Facility Name
PBU GC 2
3. Field
PBU - WOA
4, Operator
BP
5. MonthNear of Disposition
October -2016
Disposition
Volume MCF
20. For production from multiple pools, list contribution of each pool as a percent of
Total Volume.
6. Sold
Pool Name Pool Code Percent
7. Reinjected
0
PRUDHOE 640150 95.78%
AURORA 640120
8. Flared or vented 1 hour or less
9 299
BOREALIS 640130 1.33%ORION
640135 0.43%
9. Flared or vented more than 1 hour (see instr.)
9,336
POLARIS 640160 0.70%
10. Pilot and Purge
36,469
11. Assist Gas
0
12. Fuel gas used in lease operations.
519,838
13. Other (see instructions)
0
Official Use Only
Authorization >1 hr
Safety
� � � �
MCF
14. TOTAL VOLUME (ITEMS 6-12)
574,942
Lease Use
MCF
15. NGL Gas Equivalent
0
Conservation
MCF
16. Purchased gas
0
Waste:
MCF
17. Transferred from:
0
(
Commissioner Date
18. Transferred to: (Express as a negative #) CGF
-17,879,221
19. Remarks:
I hereby certify that the foregoing is true and correct to the best of my knowledge.
Nate: All volumes must be corrected
Signature �-1l 7 l✓G,��.,L�% Title Manager Production Taxes and Royalties Alaska to pressure of 14.65 psis and to a
temperature of 60o F. Authority 20
Printed Name Diane Colley Phone (907) 564-5775 Date //// A4C25.235.
V`rI
2- /t6 / f�
Form 10-422 Rev. 512009 INSTRUCTIONS ON REVERSE SIDE Submit in Duplicate
BP EXPLORATION (ALASKA) INC.
PRUDHOE BAY UNIT- GC -2
GAS FLARING INCIDENT REPORT
October 2016
Page 10
Unplanned events less than or equal to 1 hour
VOLUME DESCRIPTION OF INCIDENT & CAUSE
DATE
TIME
VOLUME DESCRIPTION OF INCIDENT & CAUSE ACTION TAKEN TO ELIMINATE CAUSE
10/7/2016
1423-1509
152 Not required for unplanned events <= 1 hr Not required for unplanned events <= 1 hr
10/8/2016
2239-2319
8,611
10/10/2016
1107-1131
450
TOTAL
TOTAL
9,213
uNII, I IMI,
VOLUME DESCRIPTION OF INCIDENT & CAUSE
ACTION TAKEN TO ELIMINATE CAUSE
10/9/2016 1645-1844
744 See Attachments
See Attachments
10/26/2016 0352-1533
5,598
1,375
TOTAL
6,342
2,994
Planned events less than or equal to 1 hour
TOTAL
DATE TIME
VOLUME DESCRIPTION OF INCIDENT & CAUSE
ACTION TAKEN TO ELIMINATE CAUSE
10/8/2016 0402-0451
10 See Attachments
See Attachments
10/10/2016 2336-2347
76
86
TOTAL
86
10/9/2016
1126-1302
667 See Attachments
10/9/2016
2120-2327
952
10/11/2016
0227-0527
1,375
TOTAL
2,994
TOTAL
Unplanned Events < 1 Hour
9,213
Unplanned Events> 1 Hour
6,342
Planned Events < 1 hour and not
86
exceeding 5,000 MCF
Planned Events > 1 hour or
2,994
exceeding 5,000 MCF
Pilot Purge
36,469
Assist
0
TOTAL FLARED VOLUME
55,104
ACTION TAKEN TO E
See Attachments
11/16/2016
5:13 PM
Flare StartDate 10/01/2016
Flare End Date 10/31/2016
GC2 Flare Report Total Volume (MSCF) 18635
Report
Numbe System Date Start Time Stop Time Duration Intermittent Black Smoke Planned Reported By Volume
16-347 Flare Relief 10/08/2016 4:02:00 am 4:51:00 am 49 min No
Determination Cause Depressure "A" Bank first stage for maintenance.
Action Taken Vessel depressured.
No Yes BP1APAOLINJM 10
16-348 Flare Relief 10/09/2016 11:26:00 am 1:02:00 pm 96 min No No
Yes BP1\PAOLINJM
667
Determination Cause Walerwash K7000.
Action Taken Waterwashcomplete.
16-348 Flare Relief 10/09/2016 4:45:00 pm 6:44:00 on 119 min Yes No
No BP1\PAOLINJM
744
Determination Cause Attempting to perform over speed trip test on K7000.
Action Taken Unable to complete test, abort.
16-348 Flare Relief 10/09/2016 9:20:00 pm 11:27:00 pm 127 min No No
Yes BP1\PAOLINJM
952
Determination Cause Spin cool K7000 after war speed trip testing so OHC can recouple turbine to compressor.
Action Taken K700 cool down completed.
Daily Volume (MSCF)
2363
16-351 Flare Relief 10/10/2016 11:36:00 pm 11 47:00 pm 11 min No No Yes BPt\PAOLINJM 76
Determination Cause Started K7000, copus starting gas to to Flare.
Action Taken K7000 up and running starting gas isolated.
16-353 Flare Relief 10/11/2016 2:27:00 am 5:27:00 am 180 min No No
Determination Cause Spin cool K7001.
Action Taken Cool down completed.
16-387 Flare Relief 10/26/2016 3:52:00 am 3:33.00 pm 701 min No No
Determination Cause K-208 and K-206 IP/LP Compressors went down due to K-208 Motor Overload
Action Taken Equipment was restarted after troubleshooting the issue
Generated 11/02/2016 4:05:39PM
Daily Volume (MSCF) 526
Yes BP1\PAOLINJM 1375
Daily Volume (MSCF) 1375
No BPl\EARLLC 5598
Daily Volume (MSCF) 5598
Total Volume (MSCF) 18635
Page 11 of 12
Link, Liz M (DOA) 06 -r'
From:
AKOpsProdEOCTL <AKOPSPCCEOCTL@bp.com>
Sent:
Monday, October 10, 2016 3:56 PM
To:
AOGCC Reporting (DOA sponsored)
Cc:
Loepp, Victoria T (DOA); Benson, Gary A; Arthur, Gregory; AK, OPS GC3&PCC OSM;
Barton, Kim; AK, HSSEE Env Adv West, Glover, Robin; Buckbee, Rachel A; AK, OPS GC2
Facility OTL; AK, OPS GC2 OSM; Schinagl, Werner
Subject:
Flaring Events at GC2
To: AOGCC Reporting
CC: Victoria Loepp, AOGCC
Aogcc.reporting(alaska.gov
Victoria. Ioepp(aalaska.gov
From: Jennifer Blake, GPB Production Optimization Team Leader
A flaiTfig eventamrrre starting at 09/22/2016 19:00
The event lasted for 300 minutes and wa re
repairs. The flarin apspecl when spin cooling was con
sAwit a volume of 562 (MSCF).
K-7000 shutdown and spin cool for water wash and
A flaring event occurred at GC2 starting at 10/08/2016 22:39 and stopping at 10/08/2016 23:19 with a volume of 8611
(MSCF). The event lasted for 40 minutes and was due to the K-7001 LPS Compressor shutdown due to high liquid level in
the gas suction knock out. The flaring event stopped when the liquid level cleared and the compressor restarted.
<(4"1—
A flaring event occurred at GC2 starting at 10/09/201611:26 and stopping at 10/09/2016 13:02 with a volume of 667
(MSCF). The event lasted for 96 minutes and was due to water washing the K-7000 LPS Compressor. The flaring event
stopped when the water wash was completed.
A flaring event occurred at GC2 starting at 10/09/2016 16:45 and stopping at 10/09/2016 18:44 with a volume of 744
(MSCF). The event lasted for 119 minutes and was due to attempting to perform the over speed trip test on K-7000. The
flaring event stopped when the test was aborted.
A flaring event occurred at GC2 starting at 10/09/2016 21:20 and stopping at 10/09/2016 23:27 with a volume of 952
(MSCF). The event lasted for 127 minutes and was due to spin cooling K7000 LPS Compressor after over speed trip
testing so overhaul could recouple the turbine to the compressor. The flaring event stopped when the spin cooling was
completed.
Thanks,
Jennifer Blake
EOC Production Optimization Team Lead
Office (907) 564-5926
Cell (907) 830-6204
Jennifer.blake@bp.com
Link, Liz M (DOA)
From: AKOpsProdEOCTL <AKOPSPCCEOCTL@bp.com>
Sent: Tuesday, October 11, 2016 11:23 AM
To: AOGCC Reporting (DOA sponsored)
Cc: Loepp, Victoria T (DOA); Benson, Gary A; Arthur, Gregory; AK, OPS GC3&PCC OSM;
Borton, Kim; AK, HSSEE Env Adv West; Glover, Robin; Buckbee, Rachel A; AK, OPS GC2
Facility OTL; AK, OPS GC2 OSM; Schinagl, Werner
Subject: Flaring Events at GC2
To: AOGCC Reporting CC: Victoria Loepp, AOGCC
Aogcc.reportingna alaska.gov Victoria.loeooCilalaska.gov
From: Jennifer Blake, GPB Production Optimization Team Leader
A flaring event occurred at GC2 starting at 10/11/2016 02:27 and stopping at 10/11/2016 05:27 with a volume of 1375
(MSCF). The event lasted for 180 minutes and was due to LPS compressor K-7001 shutdown and spin cool for water
wash. The flaring event stopped when spin cooling was completed.
Thanks,
Jennifer Blake
EOC Production Optimization Team Lead
Office (907) 564-5926
Cell(907)830-6204
Jennifer.blake@bo.com
Link, Liz M (DOA)
From: AKOpsProdEOCTL <AKOPSPCCEOCTL@bp.com>
Sent: Monday, October 31, 2016 11:59 AM
To: AOGCC Reporting (DOA sponsored)
Cc: Loepp, Victoria T (DOA); Benson, Gary A; Arthur, Gregory; AK, OPS GC3&PCC OSM;
Borton, Kim; AK, HSSEE Env Adv West; Glover, Robin; Buckbee, Rachel A; AK, OPS GC2
Facility OTL; AK, OPS GC2 OSM; Schinagl, Werner
Subject: Flaring Event at GC2
To: AOGCC Reporting CC: Victoria Loepp, AOGCC
Aogcc.reporting(a)alaska.gov Victoria. Ioepp(a)alaska.gov
From: Jennifer Blake, GPB Production Optimization Team Leader
A flaring event occurred at GC2 starting at 10/26/2016 03:52 and stopping at 10/26/2016 15:33 with a volume of 5598
(MSCF). The event lasted for 701 minutes and was due to K-206 and K-208 LP/IP compressors tripping offline due to K-
208 motor overload. The flaring event stopped when troubleshooting was completed and the compressors were
restarted.
Thanks,
Jennifer Bloke
EOC Production Optimization Team Lead
Office (907) 564-5926
Cell (907) 830-6204
Jennifer.blake@bp.com
STATE OF ALASKA
ALASKA OIL AND GAS CONSERVATION COMMISSION
FACILITY REPORT OF PRODUCED GAS DISPOSITION
1. Facility Number
0290000032
2. Facility Name
PBU GC 2
3. Field
PBU - WOA
4. Operator
BP
5. MonthlYear of Disposition
I September -2016
Disposition
Volume MCF
20. Forproduction from multiple pools, list contribution of each pool as a percent of
Total Volume.
6. Sold
0
PoolName PoolCode Percent
7. Reinjected0
PRUDHOE 640150 97.20%
AURORA 640120 0.79%
6. Flared or vented 1 hour or less
240
BOREALIS 640130 1.13%
ORION 640135 0.29%
9. Flared or vented more than 1 hour (see instr.)
4,205
POLARIS 640160 0.59%
10. Pilot and Purge
35,006
11. Assist Gas
0
12. Fuel gas used in lease operations.
530,578
13. Other (see instructions)
0
Official Use Only
Authorization >1 he
Safety
Safe
-7
Z�
MCF )/'T
to/Z
14. TOTAL VOLUME (ITEMS 6-12)
570,029
Lease Use
MCF
15. NGL Gas Equivalent
0
Conservation
MCF
16. Purchased gas
0
Waste:
MCF
17. Transferred from:
0
G
-l(,
Commissioner Date
18. Transferred to: (Express as a negative #) CGF
-19,430,916
19. Remarks:
I hereby certify that the egoing is true and correct to the best of my knowledge.
a/ Note: All volumes must be corrected
Signature Title Mana er Production Taxes and Ro allies Alaska to pressure of 14.65 psis and to a
17 temperature of 60o F. Authority 20
Printed Name Diane ColleyPhone (907) 564-5775 Date ( AAC25.235.
1117116
Form 10-422 Rev. 5/2009 INSTRUCTIONS ON REVERSE SIDE Submit in Duplicate
events less than or equal to 1
BP EXPLORATION (ALASKA) INC.
PRUDHOE BAY UNIT - GC -2
GAS FLARING INCIDENT REPORT
September 2016
DESCRIPTION OF INCIDENT & CAUSE
Not required for unplanned events <= 1 hr
ACTION TAKEN TO ELIMINATE CAUSE
Not required for unplanned events <= 1 hr
TOTAL 0
Unplanned events greater than 1 hour
DATE TIME VOLUME DESCRIPTION OF INCIDENT & CAUSE ACTION TAKEN TO ELIMINATE CAUSE
9/17/2016 0030-0245 2,906 See Attachments See Attachments
TOTAL 2,906
DATE
9/25/2016
TIME
1500-1515
TOTAL
VOLUME DESCRIPTION OF INCIDENT & CAUSE
240 See Attachments
240
ACTION TAKEN TO ELIMINATE CAUSE
See Attachments
Planned events greater than 1 hour
DATE
TIME
VOLUME DESCRIPTION OF INCIDENT Be CAUSE
ACTION TAKEN TO ELIMINATE CAUSE
9/15/2016
2140-2246
737 See Attachments
See Attachments
9/22/2016
1900-2400
562
TOTAL
1,299
TOTAL
Unplanned Events <1 Hour
0
Unplanned Events > 1 Hour
2,906
Planned Events < 1 hour and not
240
exceeding 5,000 MCF
Planned Events> 1 hour or
1,299
exceeding 5,000 MCF
Pilot Purge
35,006
Assist
0
TOTAL FLARED VOLUME
39,451
Page 8
10/14/2016
1:31 PM
Flare Start Date 09/01/2016
Flare End Date 09/30/2016
GC2 Flare Report Total Volume (MSCF) 4445
Report
Numbs System Date StartTime Stop Time Duration Intermittent Black Smoke Planned Reported By Volume
10-304 Flare Relief 09/15/2016 9:40:00 pm 10:46:00 pm 66 min No Nc
Determination Cause
S -pad shut down and de -pressured for PMP work.
Action Taken
S -pad de -pressured.
16-309 Flare Relief 09/17/2016 12:30:00 am 2:45:00 am 135 min No No
Determination Cause
IP compressor shut down because of a Ground Fault on its Motor.
Action Taken
Ground Fault was reset by Electricians IP & LP compressors where restarted.
16-329 Flare Relief 09/22/2016 7:00:00 pm 12:00:00 am 300 min No No
Determination Cause
LPS compressor K-7000 shut down spin cool for water wash and repairs
Action Taken
No response taken as this was deemed to be of short duration.
16-326 Flare Relief 09/25/2016 3:00:00 pm 3:15:00 pm 15 min No No
Determination Cause Depressure B slugcatcher, 1st and 2nd stage for maintenance
Action Taken Depressure complete
Yes BPi\STYVJW 737
Daily Volume (MSCF) 737
No BP1WYVJW 2906
Daily Volume (MSCF) 2906
Daily Volume (MSCF) 562
Yes BPI\SQUIP2 240
Daily Volume (MSCF) 240
Total Volume (MSCF) 4445
Generated 10/04/2016 2:32:30PM Page 9 of 10
Link, Liz M (DOA)
From: AKOpsProdEOCTL <AKOPSPCCEOCTL@bp.com>
Sent: Thursday, September 22, 2016 10:21 AM
To: AOGCC Reporting (DOA sponsored)
Cc: Loepp, Victoria T (DOA); Benson, Gary A; Arthur, Gregory; AK, OPS GC3&PCC OSM;
Barton, Kim; AK, HSSEE Env Adv West; Glover, Robin; Buckbee, Rachel A; AK, OPS GC2
Facility OTL; AK, OPS GC2 OSM; Schinagl, Werner
Subject: Flaring Events at GC2
To: AOGCC Reporting CC: Victoria Loepp, AOGCC
Aogcc.reoorting(a)alaska.gov Victoria, Ioepp(a)alaska.gov
From: Jennifer Blake, GPB Production Optimization Team Leader
A flaring event occurred at GC2 starting at 09/15/2016 21:40 and stopping at 09/15/2016 22:46 with a volume of 737
(MSCF). The event lasted for 66 minutes and was due to S Pad shutdown and depressurization for maintenance
work. The flaring event stopped when the depressurization was completed.
A flaring event occurred at GC2 starting at 09/17/2016 00:30 and stopping at 09/17/2016 02:45 with a volume of 2906
(MSCF). The event lasted for 135 minutes and was due to an IP compressor shut down caused by a motor ground
fault. The flaring event stopped when the ground fault was reset and compressor was restarted.
Thanks,
Jennifer Blake
EOC Production Optimization Team Lead
Office (907) 564-5926
Cell (907) 830-6204
Jennifer.blake@bp.com
Link, Liz M (DOA) S9{J /6
From:
AKOpsProdEOCTL <AKOPSPCCEOCTL@bp.com>
Sent:
Monday, October 10, 2016 3:56 PM
To:
AOGCC Reporting (DOA sponsored)
Cc:
Loepp, Victoria T (DOA); Benson, Gary A; Arthur, Gregory; AK, OPS GC3&PCC OSM;
Borton, Kim; AK, HSSEE Env Adv West; Glover, Robin; Buckbee, Rachel A; AK, OPS GC2
Facility OTL, AK, OPS GC2 OSM; Schinagl, Werner
Subject:
Flaring Events at GC2
To: AOGCC Reporting CC: Victoria Loepp, AOGCC
Aogcc.reporting(d)alaska.gov Victoria loepp(a2)alaska gov
From: Jennifer Blake, GPB Production Optimization Team Leader
A flaring event occurred at GC2 starting at 09/22/2016 19:00 and stopping at 09/23/2016 with a volume of 562 (MSCF).
The event lasted for 300 minutes and was due to LPS compressor K-7000 shutdown and spin cool for water wash and
repairs. The flaring event stopped when spin cooling was completed.
A flaring event occurred at GC2 starting at 10/08/2016 22:39 and stopping at 10/08/2016 23:19 with a volume of 8611
(MSCF). The event lasted for 40 minutes and was due to the K-7001 LPS Compressor shutdown due to high liquid level in
the gas suction knock out. The flaring event stopped when the liquid level cleared and the compressor restarted.
A flaring event occurred at GC2 starting at 10/09/2016 11:26 and stopping at 10/09/201613:02 with a volume of 667
(MSCF). The event lasted for 96 minutes and was due to water washing the K-7000 LPS Compressor. The flaring event
stopped when the water wash was completed.
A flaring event occurred at GC2 starting at 10/09/2016 16:45 and stopping at 10/09/2016 18:44 with a volume of 744
(MSCF). The event lasted for 119 minutes and was due to attempting to perform the over speed trip test on K-7000. The
flaring event stopped when the test was aborted.
A flaring event occurred at GC2 starting at 10/09/2016 21:20 and stopping at 10/09/2016 23:27 with a volume of 952
(MSCF). The event lasted for 127 minutes and was due to spin cooling K7000 LPS Compressor after over speed trip
testing so overhaul could recouple the turbine to the compressor. The flaring event stopped when the spin cooling was
completed.
Thanks,
Jennifer Bloke
EOC Production Optimization Team Lead
Office (907) 564-5926
Cell (907) 830-6204
Jennifer.blake@bp.com
STATE OF ALASKA
ALASKA OIL AND GAS CONSERVATION COMMISSION
FACILITY REPORT OF PRODUCED GAS DISPOSITION
1. Facility Number
0290000032
2. Facility Name
PBU GC 2
3. Field
PBU - WOA
4. Operator
BP
5. MonthNear of Disposition
I November -2016
Disposition
Volume MCF
20. For production from multiple pools, list contribution of each pool as a percent of
Total Volume.
6. Sold
0
Pool Name Pool Code Percent
7. Reinjected
0
PRUDHOE 640150 96.52%
AURORA 640120 0.71%
8. Flared or vented 1 hour or less
1 042
BOREALIS 640130 1.46%
ORION 640135 0.90%
9. Flared or vented more than 1 hour (see instr.)
0
POLARIS 640160 0.413/6
10. Pilotand Purge
26,199
11. Assist Gas
0
12. Fuel gas used in lease operations.
603,933
13. Other (see instructions)
0
Official Use Only
Authorization >i hr:
Safety
MCF
14. TOTAL VOLUME (ITEMS 6-12)
631,174
Lease Use
MCF
15. NGL Gas Equivalent
0
Conservation
MCF
16. Purchased gas
0
Waste:
MCF
17. Transferred from:
U
18. Transferred to: (Express as a negative #) CGF
-20,688,883
Commissioner Date
19. Remarks:
I hereby certify that the foregoing is true and correct to the best of my knowledge.
M/1 Note: All volumes must be corrected
Signature Com. y Title Mana Manager Production Taxes and Ro hies Alaska to pressure of 14.65 psis and to a
U //_ temperature of 60o F. Authority 20
Printed Name Diane ColleyPhone (907) 564-5775 Date / I6 G AAC25.235.
Form 10-422 Rev. 5/2009 INSTRUCTIONS ON REVERSE SIDE Submit in Duplicate
BP EXPLORATION (ALASKA) INC.
PRUDHOE BAY UNIT - GC -2
GAS FLARING INCIDENT REPORT
November 2016
UAIL TIME VOLUME DESCRIPTION OF INCIDENT & CAUSE ACTION TAKEN TO ELIMINATE CAUSE
11/3/2016 2115-2130 1,042 Not required for unplanned events <= 1 hr Not required for unplanned events <= 1 hr
TOTAL 1,042
Unplanned events greater than 1 hour
DATE TIME VOLUME DESCRIPTION OF INCIDENT & CAUSE ACTION TAKEN TO ELIMINATE CAUSE
See Attachments See Attachments
TOTAL 0
Planned events less than or equal to 1 hour
TOTAL
See Attachments
0
See Attachments
See Attachments
Page 9
12/15/2016
12:31 PM
VULUME DESCRIPTION OF IM
See Attachments
TOTAL
0
TOTAL
Unplanned Events < 1 Hour
1,042
Unplanned Events> 1 Hour
0
Planned Events < 1 hour and not
0
exceeding 5,000 MCF
Planned Events > 1 hour or
0
exceeding 5,000 MCF
Pilot Purge
26,199
Assist
0
TOTAL FLARED VOLUME
27,241
See Attachments
See Attachments
Page 9
12/15/2016
12:31 PM
STATE OF ALASKA
ALASKA OIL AND GAS CONSERVATION COMMISSION
FACILITY REPORT OF PRODUCED GAS DISPOSITION
1. Facility Number
0290000032
2. Facility Name
PBU GC 2
3. Field
PBU - WOA
4. Operator
BP
5. MonthNear of Disposition
I December -2016
Disposition
Volume MCF
20. For production from multiple pools, list contribution of each pool as a percent of
Total volume.
6. Sold
0
Pool Name Pool Code Percent
7. Reinjected
0
PRUDHOE 640150 95.44%
AURORA 640120 1.21%
8. Flared or vented 1 hour or less
169
BOREALIS 640130 1.62%
ORION 640135 1.22%
9. Flared or vented more than 1 hour (see instr.)
0
POLARIS 640160 0.51%
10. Pilotand Purge
29,048
11. Assist Gas
0
12. Fuel gas used in lease operations.
644,363
13. Other (see instructions)
0
Use Onlyctions)
Authorization >1 hr:
Safety
MCF
14. TOTAL VOLUME (ITEMS 6-12)
673,580
Lease Use
MCF
15. NGL Gas Equivalent
0
Conservation
MCF
16. Purchased gas
0
Waste:
MCF
17. Transferred from:
0
18. Transferred to: (Express as a negative #) CGF
-18,414,395
Commissioner Date
19. Remarks:
egoing is true and correct to the best of my knowledge.
1 hereby certify that 6m,
l/t/1///�Ayi Note: All volumes must be corrected
Signature (UIL�Y� Title Manager Production Taxes and Ro aloes Alaska to pressure of 14.65 psis and to a
temperature of 60o F. Authority 20
Printed Name Diane ColleyPhone (907) 564-5775 Date ///1// AAC25.235.
Form 10422 Rev. 5/2009 INSTRUCTIONS ON REVERSE SIDE Submit in Duplicate
BP EXPLORATION (ALASKA) INC.
PRUDHOE BAY UNIT - GC -2
GAS FLARING INCIDENT REPORT
December 2016
— I i nvm VULUME DESCRIPTION OF INCIDENT & CAUSE ACTION TAKEN TO ELIMINATE CAUSE
12/16/2016 0838-0905 169 Not required for unplanned events <= 1 hr Not required for unplanned events <= 1 hr
TOTAL 169
Unplanned events greater than 1 hour
DATE TIME VOLUME DESCRIPTION OF INCIDENT & CAUSE ACTION TAKEN TO ELIMINATE CAUSE
See Attachments See Attachments
TOTAL 0
Planned events less than or equal to 1 hour
iuv¢ VULVME DESCRIPTION OF IN(
See Attachments
TOTAL 0
-^� nrvic
VULUME DESCRIPTION OF IM
See Attachments
TOTAL
0
TOTAL
Unplanned Events < 1 Hour
169
Unplanned Events> 1 Hour
0
Planned Events < 1 hour and not
0
exceeding 5,000 MCF
Planned Events > 1 hour or
0
exceeding 5,000 MCF
Pilot Purge
29,048
Assist
0
TOTAL FLARED VOLUME
29,217
See Attachments
See Attachments
CAUSE
Page 8
1/12/2017
2:11 PM