Alaska Logo
Department of Commerce, Community, and Economic Development
Alaska Oil and Gas Conservation
Commission
Loading...
HomeMy WebLinkAboutPBU Lisburne (GPMA) - BP Exploration (Alaska) Inc.State of Alaska AOGCC Gas Disposition Files Year: 2016 Facility: PBU Lisburne Prod (GPMA) Operator: BP EXPLORATION (ALASKA) INC. STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMMISSION FACILITY REPORT OF PRODUCED GAS DISPOSITION 1. Facility Number 0290000009 2. Facility Name PBU LISBURNE PROD GPMA 3. Field PBU - GPMA 4. Operator BP 5. Month/Year of Disposition I January -2016 Disposition Volume MCF 20. For production from multiple pools, list contribution of each pool as a percent of Total Volume. 6. Sold 111,173 Pool Name Pool Code Percent 7. Reinjected 10,929,599 Lisburne 640144 53.9% West Beach 640186 0.0% 8. Flared or vented 1 hour or less 0 Sadlerochlt 640150 5.4% Niakuk 640148 0.9% 9. Flared or vented more than 1 hour (see instr.) 0 Ivishak-SagRiver test in 640147 0.4% Point Mclnt re 640180 39.4% 10. Pilot and Purge 11,668 North Prudhoe Bay State 1 640152 1 0.0% 11. Assist Gas 73,266 12. Fuel gas used in lease operations. 861,280 13. Other (see instructions) 240,041 Official Use Only Authorization>i hr: Safety MCF 14. TOTAL VOLUME (ITEMS 6-12) 12,227,027 Lease Use MCF 15. NGL Gas Equivalent 111,173 Conservation MCF 16. Purchased gas Waste: MCF 17. Transferred from: 1,776,464 Commissioner Date 18. Transferred to: (Express as a negative #) O 19. Remarks: Block 13: Lift Gas Off Field; Block 17: MI from Prudhoe = 1,776,464 and Fuel Gas from Prudhoe = 0 1 hereby certify that t foregoing is true and correct to the best of my knowledge. Note: All volumes must be corrected Signature Title Manager Production Taxes and Royalties Alaska to pressure of 14.65 psis and to a / temperature of 60o F. Authority 20 Printed Name Diane ColleyPhone (907) 564-5775 Date (� AAC25.235. Form 10-422 Rev. 5/2009 INSTRUCTIONS ON REVERSE SIDE Submit in Duplicate BP EXPLORATION ALASKA, INC, CONSERVATION ORDER NO. 219 PRUDHOE BAY, LISBURNE LISBURNE PRODUCTION CENTER GAS FLARING INCIDENTS Jan -16 VOLUME PLANNED DATE TIME (MSCF) DESCRIPTION OF INCIDENTS & CAUSE UNPLANNED ACTION TAKEN TO ELIMINATE CAUSE Total Flare <=1 Hour 0 Total Flare > I Hour 0 Volume Flared 0 Measured Safety Pilot 6,302 Continuous Assist 39,643 TOTAL FLARED 45,949 BP EXPLORATION ALASKA, INC, CONSERVATION ORDER NO. 219 PRUDHOE BAY, POINT MCINTYRE LISBURNE PRODUCTION CENTER GAS FLARING INCIDENTS Jan -36 VOLUME PLANNED DATE TIME (MSCF( DESCRIPTION OF INCIDENTS & CAUSE UNPLANNED ACTION TAKEN TO ELIMINATE CAUSE Total Flare c= 1 Hour 0 Total Flare > 1 Hour Volume Flared Measured Safety Pilot 4,582 Continuous Assist 28,644 TOTALFLARED 33,226 BP EXPLORATION ALASKA, INC, CONSERVATION ORDER NO. 219 PRUDHOE BAY, COMBINED NIAKUK LISBURNE PRODUCTION CENTER GAS FLARING INCIDENTS Ian -16 VOLUME PLANNED DATE TIME (Mscf) DESCRIPTION OF INCIDENTS & CAUSE UNPLANNED ACTION TAKEN TO ELIMINATE CAUSE Total Flare c= 1 Hour 0 Total Flare> 1 Hour Volume Flared Measured Safety Pilot 101 Continuous Assist 635 TOTALFLARED 736 BP EXPLORATION ALASKA, INC, CONSERVATION ORDER NO. 219 PRUDHOE BAY, RAVEN LISBURNE PRODUCTION CENTER GAS FLARING INCIDENTS Jan -16 VOLUME PLANNED DATE TIME (Mscf) DESCRIPTION OF INCIDENTS & CAUSE UNPLANNED ACTION TAKEN TO ELIMINATE CAUSE Total Flare <=1 Hour 0 Total Flare> 1 Hour Volume Flared Measured Safety Pilot 47 Continuous Assist 298 TOTAL FLARED 345 BP EXPLORATION ALASKA, INC, CONSERVATION ORDER NO. 219 PRUDHOE BAY, PRUDHOE LISBURNE PRODUCTION CENTER GAS FLARING INCIDENTS Jan -16 VOLUME PLANNED DATE TIME (Mscf) DESCRIPTION OF INCIDENTS a CAUSE UNPLANNED ACTION TAKEN TO ELIMINATE CAUSE Total Flare c=1 Hour 0 Total Flare> 1 Hour Volume Flared Measured Safety Pilot 636 Continuous Assist 4,046 TOTAL FLARED 4,682 BP EXPLORATION ALASKA, INC, CONSERVATION ORDER NO. 219 PRUDHOE BAY, NORTH PRUDHOE BAY LISBURNE PRODUCTION CENTER GAS FLARING INCIDENTS Jan -16 VOLUME PLANNED DATE TIME (MSCF) DESCRIPTION OF INCIDENTS & CAUSE UNPLANNED ACTION TAKEN TO ELIMINATE CAUSE Total Flare c=1 Hour 0 Total Flare> 1 Hour Volume Flared Measured Safety Pilot 0 Continuous Assist 0 TOTAL FLARED BP EXPLORATION ALASKA, INC, CONSERVATION ORDER NO. 219 PRUDHOE BAY, WEST BEACH LISBURNE PRODUCTION CENTER GAS FLARING INCIDENTS ]an -16 VOLUME PLANNED DATE TIME (MSCF) DESCRIPTION OF INCIDENTS 8, CAUSE UNPLANNED ACTION TAKEN TO ELIMINATE CAUSE Total Flare <=1 Hour 0 Total Flare> 1 Hour Volume Flared Measured Safety Pilot Continuous Assist TOTAL FLARED 0 STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMMISSION FACILITY REPORT OF PRODUCED GAS DISPOSITION 1. Facility Number 0290000009 2. Facility Name PBU LISBURNE PROD GPMA 3. Field PBU - GPMA 4. Operator BP 5. Month/Year of Disposition February -2016 Disposition Volume MCF 20. For production from multiple pools, list contribution of each pool as a percent of Total Volume. 6. Sold 85,897 Pool Name Pool Code Percent 7. Reinjected 10,920,252 Lisburne 640144 39.6% West Beach 640186 0.0% 8. Flared or vented 1 hour or less 0 Sadlerochlt 640150 9.6% Niakuk 640148 0.3% 9. Flared or vented more than 1 hour (see instr.) 0 Ivishak-SagRiver test in 640147 0.2% Point McIntyre 640180 50.3% 10. Pilot and Purge 10,803 North Prudhoe Bay State 640152 0.0% 11. Assist Gas 81,495 12. Fuel gas used in lease operations. 829,254 13. Other (see instructions) 236,388 Official Use Only Authorization>1 hr: Safety MCF 14. TOTAL VOLUME (ITEMS 6-12) 12,174,089 Lease Use MCF 15. NGL Gas Equivalent 95,897 Conservation MCF 16. Purchased gas Q Waste: MCF 17. Transferred from: 1,877,510 18. Transferred to: (Express as a negative #) 0 Commissioner Date 19. Remarks: Block 13: Lift Gas Off Field; Block 17: MI from Prudhoe = 1,877,510 and Fuel Gas from Prudhoe = 0 tt a foregoing is true and correct to the best of my knowledge. 1 hereby certify tha61n' / I!/1 1 '�f�/� Note: All volumes must be corrected Signature _ 44` 1 lll,,,41-u1" Title Manager Production Taxes and Royalties Alaska to pressure of 14.65 psis and to a temperature of 60o F. Authority 20 Printed Name Diane Colley// Phone (907) 564-5775 Date (� AAC25.235. Form 10-422 Rev. 5/2009 INSTRUCTIONS ON REVERSE SIDE Submit in Duplicate BP EXPLORATION ALASKA, INC, CONSERVATION ORDER NO. 219 PRUDHOE BAY, LISBURNE LISBURNE PRODUCTION CENTER GAS FLARING INCIDENTS Feb -16 VOLUME PLANNED DATE TIME (MSCF( DESCRIPTION OF INCIDENTS & CAUSE UNPLANNED ACTION TAKEN TO ELIMINATE CAUSE Total Flare .I Hour 0 Total Flare> 1 Hour 0 Volume Flared 0 Measured Safety Pilot 4,282 Continuous Assist 32,192 TOTALFLARED 36,474 BP EXPLORATION ALASKA, INC, CONSERVATION ORDER NO. 219 PRUDHOE BAY, POINT MCINTYRE LISBURNE PRODUCTION CENTER GAS FLARING INCIDENTS Feb -36 VOLUME PLANNED DATE TIME (MSCF) DESCRIPTION OF INCIDENTS & CAUSE UNPLANNED ACTION TAKEN TO ELIMINATE CAUSE Total Flare c= 1 Hour Total Flare> 1 Hour Volume Flared o Measured Safety Pilot 5,438 Continuous Assist 41,034 TOTAL FLARED 46,472 BP EXPLORATION ALASKA, INC, CONSERVATION ORDER NO. 219 PRUDHOE BAY, COMBINED NIAKUK LISBURNE PRODUCTION CENTER GAS FLARING INCIDENTS Feb -16 VOLUME PLANNED DATE TIME (Mstf) DESCRIPTION OF INCIDENTS & CAUSE UNPLANNED ACTION TAKEN TO ELIMINATE CAUSE Total Flare . I Hour 0 Total Fiore> 1 Hour Volume Flared Measured Safety Pilot 36 Continuous Assist 264 TOTALFLARED 300 BP EXPLORATION ALASKA, INC, CONSERVATION ORDER NO. 219 PRUDHOE BAY, RAVEN LISBURNE PRODUCTION CENTER GAS FLARING INCIDENTS Feb -I6 VOLUME PLANNED DATE TIME )Mscf) DESCRIPTION OF INCIDENTS & CAUSE UNPLANNED ACTION TAKEN TO ELIMINATE CAUSE Total Flare <=1 Hour Total Flare> 1 Hour Volume Flared Measured Safety Pilot 17 Continuous Assist 141 TOTALFLARED 158 BP EXPLORATION ALASKA, INC, CONSERVATION ORDER NO. 219 PRUDHOE BAY, PRUDHOE LISBURNE PRODUCTION CENTER GAS FLARING INCIDENTS Feb -16 VOLUME PLANNED DATE TIME (Mscf) DESCRIPTION OF INCIDENTS & CAUSE UNPLANNED ACTION TAKEN TO ELIMINATE CAUSE Total Flare <= 1 Hour 0 Total Flare> 1 Hour Volume Flared Measured Safety Pilot 1,030 Continuous Assist 7,864 TOTALFLARED 8,894 BP EXPLORATION ALASKA, INC, CONSERVATION ORDER NO. 219 PRUDHOE BAY, NORTH PRUDHOE BAY LISBURNE PRODUCTION CENTER GAS FLARING INCIDENTS Feb -16 VOLUME PLANNED DATE TIME )MSCF) DESCRIPTION OF INCIDENTS&CAUSE UNPLANNED ACTION TAKEN TO ELIMINATE CAUSE Total Flare c= I Hour 0 Total Flare> 1 Hour Volume Flared 0 Measured Safety Pilot 0 Continuous Assist 0 TOTAL FLARED 0 BP EXPLORATION ALASKA, INC, CONSERVATION ORDER NO. 219 PRUDHOE BAY, WEST BEACH LISBURNE PRODUCTION CENTER GAS FLARING INCIDENTS Feb -16 VOLUME PLANNED DATE TIME (MSCF( DESCRIPTION OF INCIDENTS & CAUSE UNPLANNED ACTION TAKEN TO ELIMINATE CAUSE Total Flom .I Hour 0 Total Flare > 1 Hour Volume Flared Measured Safety Pilot Continuous Assist TOTALFLARED 0 STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMMISSION FACILITY REPORT OF PRODUCED GAS DISPOSITION 1. Facility Number2. 0290000009 Facility Name PBU LISBURNE PROD GPMA 3. Field PBU - GPMA 4. Operator BP 5. Month/Year of Disposition I March -2016 Disposition Volume MCF 20. For production from multiple pools, list contribution of each pool as a percent of Total Volume. 6. Sold 103,885 Pool Name Pool Code Percent 7. Reinjected 11,109,734 Lisburne 640144 42.2% West Beach 640186 0.0% 8. Flared or vented 1 hour or less 1 Sadlerochit 640150 5.2% Niakuk 640148 0.8% 9. Flared or vented more than 1 hour (see instr.) 0 Ivishak-SagRiver test in 640147 1.2% Point McIntyre 640180 50.5% 10. Pilot and Purge 11,581 North Prudhoe Bay State 640152 0.0% 11. Assist Gas 116,092 12. Fuel gas used in lease operations. 844,338 13. Other (see instructions) 217,730 Use Onlyons) Authorization >1 hr: Safety MCF 14. TOTAL VOLUME (ITEMS 6-12) 12,403,361 Lease Use MCF 15. NGL Gas Equivalent 103,885 Conservation MCF 16. Purchased gas 0 Waste: MCF 17. Transferred from: 1,606,580 Commissioner Date 18. Transferred to: (Express as a negative #) 0 19. Remarks: Block 13: Lift Gas Off Field; Block 17: MI from Prudhoe = 1,606,580 and Fuel Gas from Prudhoe = 0 I hereby certify that t foregping is t ue and correct to the best of my knowledge. ///j/►/�,��� Note: All volumes must be corrected Signature_ _ytcee-�i"/J Title Manager Production Taxes and R alties Alaska to pressure of 14.65 psis and to a / p / J temperature of 60o F. Authority 20 Printed Name Diane Colle f Phone (907) 564-5775 Date 7 0 6 AAC25.235. '0116 Form 10-422 Rev. 5/2009 INSTRUCTIONS ON REVERSE SIDE Submit in Duplicate BP EXPLORATION ALASKA, INC, CONSERVATION ORDER NO. 219 PRUDHOE BAY, LISBURNE LISBURNE PRODUCTION CENTER GAS FLARING INCIDENTS Mar -16 VOLUME PLANNED DATE TIME (MSCF( DESCRIPTION OF INCIDENTS & CAUSE UNPLANNED ACTION TAKEN TO ELIMINATE CAUSE Total Flare <=1 Hour 0 Total Rare> 1 Hour Volume Flared Measured Safety Pilot 4,924 Continuous Assist 49,505 TOTAL FLARED 54,429 BP EXPLORATION ALASKA, INC, CONSERVATION ORDER NO. 219 PRUDHOE BAY, POINT MCINTYRE LISBURNE PRODUCTION CENTER GAS FLARING INCIDENTS Mar -36 VOLUME PLANNED DATE TIME (MSCF) DESCRIPTION OF INCIDENTS & CAUSE UNPLANNED ACTION TAKEN TO ELIMINATE CAUSE 3/11/2016 0330-0333 1 1803 discharge valve leaked and pressurized the compressor U 1801 T/C depressurization completed. Total Flare <=1 Hour 1 Total Flare > 1 Hour Volume Flared Measured Safety Pilot 5,812 Continuous Assist 57,991 TOTALFLARED 63,884 BP EXPLORATION ALASKA, INC, CONSERVATION ORDER NO. 219 PRUDHOE BAY, COMBINED NIAKUK LISBURNE PRODUCTION CENTER GAS FLARING INCIDENTS Mar -I6 VOLUME PLANNED DATE TIME IMscff DESCRIPTION OF INCIDENTS & CAUSE UNPLANNED ACTION TAKEN TO ELIMINATE CAUSE Total Flare.I Hour 0 Total Flare> 1 Hour Volume Flared Measured Safety Pilot 98 Continuous Assist 971 TOTAL FLARED 1,069 BP EXPLORATION ALASKA, INC, :ONSERVATION ORDER NO. 219 PRUDHOE BAY, RAVEN LISBURNE PRODUCTION CENTER GAS FLARING INCIDENTS Mar -16 VOLUME PLANNED DATE TIME IMscf) DESCRIPTION OF INCIDENTS & CAUSE UNPLANNED ACTION TAKEN TO ELIMINATE CAUSE Total Flare <=1 Hour 0 Total Flare> 1 Hour Volume Flared Measured Safety Pilot 143 Continuous Assist 1,430 TOTAL FLARED 1,573 BP EXPLORATION ALASKA, INC, CONSERVATION ORDER NO. 219 PRUDHOE BAY, PRUDHOE LISBURNE PRODUCTION CENTER GAS FLARING INCIDENTS Mar46 VOLUME PLANNED DATE TIME (Mstf( DESCRIPTION OF INCIDENTS & CAUSE UNPLANNED ACTION TAKEN TO ELIMINATE CAUSE Total Flare <= 1 Hour Total Flare> 1 Hour Volume Flared Measured Safety Pilot 604 Continuous Assist 6,195 TOTALFLARED 6,799 BP EXPLORATION ALASKA, INC, CONSERVATION ORDER NO. 219 PRUDHOE BAY, NORTH PRUDHOE BAY LISBURNE PRODUCTION CENTER GAS FLARING INCIDENTS Mar -I6 VOLUME PLANNED DATE TIME (MSCF) DESCRIPTION OF INCIDENTS & CAUSE UNPLANNED ACTION TAKEN TO ELIMINATE CAUSE Total Flare <=1 Hour 0 Total Flare> 1 Hour Volume Flared Measured Safety Pilot 0 Continuous Assist 0 TOTAL FLARED 0 BP EXPLORATION ALASKA, INC, CONSERVATION ORDER NO. 219 PRUDHOE BAY, WEST BEACH LISBURNE PRODUCTION CENTER GAS FLARING INCIDENTS Mar -16 VOLUME PLANNED DATE TIME IMSCFI DESCRIPTION OF INCIDENTS & CAUSE UNPLANNED ACTION TAKEN TO ELIMINATE CAUSE Total Flare <=1 Hour 0 Total Flare> 1 Hour Volume Flared Measured Safety Pilot Continuous Assist TOTAL FLARED D RECEIVED by APR 19 2016 .AOGCC 0 BP Exploration (Alaska) Inc. PO Box 196612 900 East Benson Boulevard Anchorage, Alaska 99519-6612 April 18, 2016 Recipients of the Lisburne Production Center Gas Disposition Report: Enclosed is the March 2016 LPC Facility Gas Disposition Report (AOGCC Form 10-422). Please call Anne Fiedler at (907) 564-5826 if you have any questions. Sincerely, AWO 1 7 Diane Colley Manager, Production Taxes and Royalties Alaska Enclosures STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMMISSION FACILITY REPORT OF PRODUCED GAS DISPOSITION 1. Facility Number 0290000009 2. Facility Name PBU LISBURNE PROD GPMA 3. Field PBU - GPMA 4. Operator BP 5. MonthNear of Disposition Aril -2016 Disposition Volume MCF 20. For production from multiple pools, list contribution of each pool as a percent of Total Volume. 6. Sold 76,751 Pool Name Pool Code Percent 7. Reinjected 9,761,920 Lisburne 640144 41.8% West Beach 640186 0.0% 6. Flared or vented 1 hour or less 3 Sadlerochit 640150 2.9% Niakuk 640148 0.9% 9. Flared or vented more than 1 hour (see instr.) 3,136 Ivishak-SagRiver test In 640147 0.8% Point McIntyre 640180 53.5% 10. Pilot and Purge 11,170 North Prudhoe Bay State 640152 0.0% 11. Assist Gas 118,416 12. Fuel gas used in lease operations. 805,887 13. Other (see instructions) 157,956 Official Use Only Authorization >i hr: Safety f MCF V /`I/ 14. TOTAL VOLUME (ITEMS 6-12) 10,935,239 Lease Use MCF 15. NGL Gas Equivalent 76,751 Conservation MCF 16. Purchased gas 0 Waste: MCF 17. Transferred from: 1,190,910 Commissioner Y Date 16. Transferred to: (Express as a negative fl) 0 19. Remarks: Block 13: Lift Gas Off Field; Block 17: MI from Prudhoe = 1,190,838 and Fuel Gas from Prudhoe = 72 1 hereby certify that the foregoing is true and correct to the best of my knowledge. ' I' //lr��M� Note: All volumes must be corrected Signature libG��y!� Title Manager Production Taxes and Ro alties Alaska to pressure of 14.65 Asia and to a temperature of 60o F. Authority 20 Printed Name Diane Colley Phone (907) 564-5775 Date /U/ AAC25.235. Form 10-422 Rev. 5/2009 INSTRUCTIONS ON REVERSE SIDE Submit in Duplicate BP EXPLORATION ALASKA, INC, CONSERVATION ORDER NO. 219 PRUDHOE BAY, LISBURNE LISBURNE PRODUCTION CENTER GAS FLARING INCIDENTS Apr -16 VOLUME PLANNED DATE TIME (MSCF) DESCRIPTION OF INCIDENTS a CAUSE UNPLANNED ACTION TAKEN TO ELIMINATE CAUSE 4/9/2016 13:48 - 13:49 Total flare r_ 1 Hour 1 Loss of power generaation due to CPS trouble and 52-25 4/24/2016 06:35-14:59 1,395 breaker not opening. Total Flore> 1 Hour 1,395 Volume Flared 1,396 Measured Safety Pilot 4,667 Continuous Assist 49,362 TOTALFLARED 55,425 Depressured and restarted plant BP EXPLORATION ALASKA, INC, CONSERVATION ORDER NO. 219 PRUDHOE BAY, POINT MCINTYRE LISBURNE PRODUCTION CENTER GAS FLARING INCIDENTS Apr -I6 VOLUME PLANNED DATE TIME (MSCF) DESCRIPTION OF INCIDENTS & CAUSE UNPLANNED ACTION TAKEN TO ELIMINATE CAUSE 4/9/2016 13:48 - 13:49 Total Flare <=1 Hour 2 Loss of power generaation due to CPS trouble and 52-25 4/24/2016 06:35 -14:59 1,588 breaker not opening. U Depressured and restarted plant Total Flare> 1 Hour 1,588 Volume Flared 1,590 Measured Safety Pilot 5,982 Continuous Assist 63,537 TOTAL FLARED 71,109 BP EXPLORATION ALASKA, INC, CONSERVATION ORDER NO. 219 PRUDHOE BAY, COMBINED NIAKUK LISBURNE PRODUCTION CENTER GAS FLARING INCIDENTS Apr -36 VOLUME PLANNED DATE TIME fMnf) DESCRIPTION OF INCIDENTS & CAUSE UNPLANNED ACTION TAKEN TO ELIMINATE CAUSE Total Flare <=1 Hour 0 4/24/2016 06:35 - 14:59 35 Total Flare> i Hour 35 Volume Flared 35 Measured Safety Pilot 103 Continuous Assist 1,093 TOTAL FLARED 1,231 Loss of power generaation due to CPS trouble and 52-25 breaker not opening. U Depressured and restarted plant BP EXPLORATION ALASKA, INC, CONSERVATION ORDER NO. 219 PRUDHOE BAY, RAVEN LISBURNE PRODUCTION CENTER GAS FLARING INCIDENTS Apr -16 VOLUME PLANNED DATE TIME (Ni DESCRIPTION OF INCIDENTS & CAUSE UNPLANNED ACTION TAKEN TO ELIMINATE CAUSE Total Flare <= 1 Hour 0 4/24/2016 06:35-14:59 21 Total Flare> 3 Hour 21 Volume Flared 21 Measured Safety Pilot 93 Continuous Assist 972 TOTAL FLARED 1,086 Loss of power generaation due to CPS trouble and 52-25 breaker not opening. U Depressured and restarted plant BP EXPLORATION ALASKA, INC, CONSERVATION ORDER NO. 219 PRUDHOE BAY, PRUDHOE LISBURNE PRODUCTION CENTER GAS FLARING INCIDENTS Apr -16 VOLUME PLANNED DATE TIME (Msof( DESCRIPTION OF INCIDENTS & CAUSE UNPLANNED ACTION TAKEN TO ELIMINATE CAUSE Total Flare <= 2 Hour 0 4/24/2016 06:35-14:59 97 Total Flom, 1 Hour 97 Volume Flared 97 Measured Safety Pilot 325 Continuous Assist 3,452 TOTAL FLARED 3,874 Loss of power generaation due to CPS trouble and 52-25 breaker not opening. Depressured and restarted plant BP EXPLORATION ALASKA, INC, :ONSERVATION ORDER NO. 219 PRUDHOE BAY, NORTH PRUDHOE BAY LISBURNE PRODUCTION CENTER GAS FLARING INCIDENTS Apr -16 VOLUME PLANNED DATE TIME (MSCF( DESCRIPTION OF INCIDENTS & CAUSE UNPLANNED ACTION TAKEN TO ELIMINATE CAUSE Total Flare <=1 Hour 0 Total Flare > 1 Hour Volume Flared Measured Safety Pilot 0 Continuous Assist 0 TOTALFLARED BP EXPLORATION ALASKA, INC, CONSERVATION ORDER NO. 219 PRUDHOE BAY, WEST BEACH LISBURNE PRODUCTION CENTER GAS FLARING INCIDENTS Apr -I6 VOLUME PLANNED DATE TIME (MSCF) DESCRIPTION OF INCIDENTS & CAUSE UNPLANNED ACTION TAKEN TO ELIMINATE CAUSE Total Flare <=1 Hour 0 Total Flare> 1 Hour Volume Flared Measured Safety Pilot 0 Continuous Assist 0 TOTALFLARED 0 Link, Liz M (DOA) From: AK, OPS PCC EOC TL <AKOPSPCCEOCTL@bp.com> Sent: Monday, April 25, 2016 6:15 PM To: .aogcc.reporting @alaska.gov' Cc: Loepp, Victoria T (DOA); Benson, Gary A; Arthur, Gregory; AK, OPS GC3&PCC OSM; Martin, Nelson D; AK, HSSEE Env Adv East; AK, OPS GPMA Facility OTL; Glover, Robin; Kain, Rachel B; AK, OPS GPMA OSM Subject: Flaring Event at LPC To: AOGCC Reporting CC: Victoria Loepp, AOGCC aogcc reoorting(a-)alaskagov From: Jennifer Blake, GPB Production Optimization Team Leader A flaring event occurred at LPC starting at 04/24/2016 06:35 and stopping at 04/24/2016 14:59 with a volume of 3136 (MSCF). The event lasted for 504 minutes and was due to loss of power generation due to CPS Trouble and 52-25 breaker not opening. The event was intermittent and stopped when LPC depressured and restarted plant. Thanks, Jennifer Blake PCC/EOC Production Optimization Team Lead (alt David Spall) Office (907) 659-4472 Cell (907) 830-6204 Jennifer.blake@bp.com STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMMISSION FACILITY REPORT OF PRODUCED GAS DISPOSITION 1. Facility Number 0290000009 2. Facility Name PBU LISBURNE PROD GPMA 3. Field PBU - GPMA 4. Operator BP 5. MonthNear of Disposition May -2016 Disposition Volume MCF 20. For production from multiple pools, list contribution of each pool as a percent of Total Volume. 6. Sold 34,393 Pool Name Pool Code Percent 7. Reinjected 8,807,389 Lisburne 640144 38.00/0 West Beach 640186 0.0% 8. Flared or vented 1 hour or less 4 Sadlerochit 640150 2.4% Niakuk 640148 1.0% 9. Flared or vented more than 1 hour (see instr.) 0 Ivishak-SagRiver test in 640147 0.6% Point McIntyre 640180 58.0% 10. Pilot and Purge 11,361 North Prudhoe Ba State 640152 0.0% 11. Assist Gas 153,926 12. Fuel gas used in lease operations. 798,473 13. Other (see instructions) 223,619 - Official Use Only Authorization>i hr: Safety MCF 14. TOTAL VOLUME (ITEMS 6-12) 10,029,165 Lease Use MCF 15. NGL Gas Equivalent 34,393 Conservation MCF 16. Purchased gas U Waste: MCF 17. Transferred from: 318,141 1 Commissioner Date 18. Transferred to: (Express as a negative #) 0 19. Remarks: Block 13: Lift Gas Off Field; Block 17: Mf from Prudhoe = 318,141 and Fuel Gas from Prudhoe = 0 1 hereby certify that the f regoing is true and correct to the hest of my knowledge. Note: All volumes must be corrected Signature Title Manager Production Taxes a d R allies Alaska to pressure of 14.65 psis and to a temperature of 60o F. Authority 20 Printed Name Diane ColleyPhone (907) 564-5775 Date 6 9/ AAC25.235. Form 10-422 Rev. 512009 INSTRUCTIONS ON REVERSE SIDE Submit in Duplicate BP EXPLORATION ALASKA, INC, CONSERVATION ORDER NO. 219 PRUDHOE BAY, LISBURNE LISBURNE PRODUCTION CENTER GAS FLARING INCIDENTS May -16 VOLUME PLANNED DATE TIME )MSCF) DESCRIPTION OF INCIDENTS & CAUSE UNPLANNED ACTION TAKEN TO ELIMINATE CAUSE 5/19/2016 18:39 - 18:40 2 Over pressure of depropanizer on start up U Started 1855 Total Flare <= 1 Hour 2 Total Flare> 1 Hour Volume Flared Measured Safety Pilot 4,313 Continuous Assist 58,509 TOTAL FLARED 62,824 BP EXPLORATION ALASKA, INC, CONSERVATION ORDER NO. 219 PRUDHOE BAY, POINT MCINTYRE LISBURNE PRODUCTION CENTER GAS FLARING INCIDENTS May -16 VOLUME PLANNED DATE TIME (MSCF) DESCRIPTION OF INCIDENTS & CAUSE UNPLANNED ACTION TAKEN TO ELIMINATE CAUSE 5/19/2016 18:39 -18:40 2 Over pressure of depropanizer on start up U Started 1855 Total Flare <=1 Hour 2 Total Flare> 1 Hour Volume Flared Measured Safety Pilot 6,591 Continuous Assist 89,243 TOTAL FLARED 95,836 BP EXPLORATION ALASKA, INC, CONSERVATION ORDER NO. 219 PRUDHOE BAY, COMBINED NIAKUK LISBURNE PRODUCTION CENTER GAS FLARING INCIDENTS May -16 VOLUME PLANNED DATE TIME (Mscf) DESCRIPTION OF INCIDENTS & CAUSE UNPLANNED ACTION TAKEN TO ELIMINATE CAUSE Total Flare <= I Hour Total Flare> 1 Hour Volume Flared 0 Measured Safety Pilot 112 Continuous Assist 1,524 TOTAL FLARED 1,636 BP EXPLORATION ALASKA, INC, CONSERVATION ORDER NO. 219 PRUDHOE BAY, RAVEN LISBURNE PRODUCTION CENTER GAS FLARING INCIDENTS May -16 VOLUME PLANNED DATE TIME (Mscf( DESCRIPTION OF INCIDENTS & CAUSE UNPLANNED ACTION TAKEN TO ELIMINATE CAUSE Total Flare <= 1 Hour 0 Total Flare> 1 Hour Volume Flared Measured Safety Pilot 69 Continuous Assist 934 TOTAL FLARED 1,003 BP EXPLORATION ALASKA, INC, CONSERVATION ORDER NO. 219 PRUDHOE BAY, PRUDHOE LISBURNE PRODUCTION CENTER GAS FLARING INCIDENTS May -16 VOLUME PLANNED DATE TIME (Mscf( DESCRIPTION OF INCIDENTS & CAUSE UNPLANNED ACTION TAKEN TO ELIMINATE CAUSE Total Flare <= I Hour 0 Total Flare > I Hour Volume Flared Measured Safety Pilot 276 Continuous Assist 3,716 TOTAL FLARED 3,992 BP EXPLORATION ALASKA, INC, CONSERVATION ORDER NO. 219 PRUDHOE BAY, NORTH PRUDHOE BAY LISBURNE PRODUCTION CENTER GAS FLARING INCIDENTS May -16 VOLUME PLANNED DATE TIME IMSCF) DESCRIPTION OF INCIDENTS & CAUSE UNPLANNED ACTION TAKEN TO ELIMINATE CAUSE Total Flare <=1 Hour 0 Total Flare> 1 Hour Volume Flared Measured Safety Pilot Continuous Assist TOTALFLARED BP EXPLORATION ALASKA, INC, CONSERVATION ORDER NO. 219 PRUDHOE BAY, WEST BEACH LISBURNE PRODUCTION CENTER GAS FLARING INCIDENTS May -16 VOLUME PLANNED DATE TIME (MSCF) DESCRIPTION OF INCIDENTS & CAUSE UNPLANNED ACTION TAKEN TO ELIMINATE CAUSE Total Flare =1 Hour 0 Total Flare> 1 Hour Volume Flared Measured Safety Pilot 0 Continuous Assist 0 TOTALFLARED 0 STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMMISSION FACILITY REPORT OF PRODl1CFD rAs n1!gPnS1T1nN 1. Facility Number 0290000009 2. Facility Name PBU LISBURNE PROD GPMA 3. Field PBU - GPMA 4. Operator • BP 5. Month/Year of Disposition I June -2016 Disposition Volume MCF 20. For production from multiple pools, list contribution of each pool as a percent of Total Volume. 6, Sold 79,097 Pool Name Pool Code Percent 7. Reinjected 8,473,100 Lisburne 640144 53.7% West Beach 640186 0.0% 8. Flared or vented 1 hour or less 1 Sadlerochit 640150 0.0% Niakuk 640148 0.6% 9. Flared or vented more than 1 hour (see instr.) 0 Ivishak-SagRiver test in 640147 0.2% Point Mclnt re 640180 45.5% 10. Pilot and Purge 11,047 North Prudhoe Bay State 640152 0.0% 11. Assist Gas 133,113 12. Fuel gas used in lease operations. 800,304 13. Other (see instructions) 288,384 Official Use Only Authorization >i he Safety MCF 14. TOTAL VOLUME (ITEMS 6.12) 9,785,046 Lease Use MCF 15. NGL Gas Equivalent 79,097 Conservation MCF 16. Purchased gas 0 Waste: MCF 17. Transferred from: 881,446 Commissioner Date 18. Transferred to: (Express as a negative #) 0 19. Remarks: Block 13: Lift Gas Off Field; Block 17: MI from Prudhoe = 881,446 and Fuel Gas from Prudhoe = 0 1 hereby certify that the foregoing is true and correct to the best of my knowledge. g W� L- �� . - Note: All volumes must be corrected Si nature li!� Title Manager Production Taxes and Royalties Alaska to pressure of 14.65 psis and to a fO r' temperature of 60o F. Authority 20 Printed Name Diane ColleyPhone (907) 564-5775 Date -L (o AAC25.235. Form 10-422 Rev. 5/2009 INSTRUCTIONS ON REVERSE SIDE Submit in Duplicate BP EXPLORATION ALASKA, INC, CONSERVATION ORDER NO. 219 PRUDHOE BAY, LISBURNE LISBURNE PRODUCTION CENTER GAS FLARING INCIDENTS lur,46 VOLUME PLANNED DATE TIME (MSCF) DESCRIPTION OF INCIDENTS & CAUSE UNPLANNED ACTION TAKEN TO ELIMINATE CAUSE Total Flare .2 Hour 0 Total Flare> 1 Hour Volume Flared Measured Safety Pilot 5,958 Continuous Assist 70,580 TOTAL FLARED 76,538 BP EXPLORATION ALASKA, INC, CONSERVATION ORDER NO. 219 PRUDHOE BAY, POINT MCINTYRE LISBURNE PRODUCTION CENTER GAS FLARING INCIDENTS Jun -16 VOLUME PLANNED DATE TIME (MSCF) DESCRIPTION OF INCIDENTS & CAUSE UNPLANNED ACTION TAKEN TO ELIMINATE CAUSE 1 P019 -CV Flare valve on the STV Suction Scrubber vented due 6/13/2016 14:33 - 14:40 to process upset. U Flare valve closed. Total Flare r_ 1 Hour 1 Total Flare> 1 Hour Volume Flared Measured Safety Pilot 5,006 Continuous Assist 51,520 TOTALFLARED 66,527 BP EXPLORATION ALASKA, INC, CONSERVATION ORDER NO. 219 PRUDHOE BAY, COMBINED NIAKUK L15BURNE PRODUCTION CENTER GAS FLARING INCIDENTS Jun -I6 VOLUME PLANNED DATE TIME IMscfl DESCRIPTION OF INCIDENTS & CAUSE UNPLANNED ACTION TAKEN TO Total Flare <= 3 Hour Total Flare> 1 Hour Volume Flared Measured Safety Pilot 61 Continuous Assist 743 TOTALFLARED 804 BP EXPLORATION ALASKA, INC, CONSERVATION ORDER NO. 219 PRUDHOE BAY, RAVEN LISBURNE PRODUCTION CENTER GAS FLARING INCIDENTS Jun -16 VOLUME PLANNED IMscfl DESCRIPTION OF INCIDENTS & CAUSE UNPLANNED ACTION TAKEN TO ELIMINATE CAUSE Total Flare c 1 Hour 0 Total Flare> 1 Hour Volume Flared Measured Safety Pilot 20 Continuous Assist 235 TOTAL FLARED 255 BP EXPLORATION ALASKA, INC, CONSERVATION ORDER NO. 219 PRUDHOE BAY, PRUDHOE LISBURNE PRODUCTION CENTER GAS FLARING INCIDENTS Jun -16 VOLUME PLANNED DATE TIME (Mscf) DESCRIPTION OF INCIDENTS & CAUSE UNPLANNED ACTION TAKEN TO ELIMINATE CAUSE Total Flare c= 1 Hour 0 Total Flare> 1 Hour Volume Flared Measured Safety Pilot 2 Continuous Assist 35 TOTAL FLARED 37 BP EXPLORATION ALASKA, INC, CONSERVATION ORDER NO. 219 PRUDHOE BAY, NORTH PRUDHOE BAY LISBURNE PRODUCTION CENTER GAS FLARING INCIDENTS Jun -1B VOLUME PLANNED DATE TIME )MSCF) DESCRIPTION OF INCIDENTS & CAUSE UNPLANNED ACTION TAKEN TO ELIMINATE CAUSE Total Flare <=1 Hour 0 Total Flare > I Hour Volume Flared Measured Safety Pilot 0 Continuous Assist 0 TOTALFLARED 0 BP EXPLORATION ALASKA, INC, CONSERVATION ORDER NO. 219 PRUDHOE BAY, WEST BEACH LISBURNE PRODUCTION CENTER GAS FLARING INCIDENTS Jun -16 VOLUME PLANNED DATE TIME (MSCF) DESCRIPTION OF INCIDENTS & CAUSE UNPLANNED ACTION TAKEN TO ELIMINATE CAUSE Total Flare <_ 1 Hour 0 Total Flare > 1 Hour Volume Flared Measured Safety Pilot Continuous Assist TOTALFLAREO by RECEIVES JUl- 18 2016 OGCC 900 East Benson Boulevard Anchorage, Alaska 99519-6612 July 15, 2016 Recipients of the Lisburne Production Center Gas Disposition Report: Enclosed is the June 2016 LPC Facility Gas Disposition Report (AOGCC Form 10-422). Please call Anne Fiedler at (907) 564-5826 if you have any questions. Sincerely, Diane Colley Manager, Production Taxes and Royalties Alaska Enclosures STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMMISSION FACILITY REPORT OF PRODUCED GAS DISPOSITION 1. Facility Number 0290000009 2. Facility Name PBU LISBURNE PROD GPMA 3. Field PBU - GPMA 4. Operator BP 5. MonthNear of Disposition July -2016 Disposition Volume MCF 20. For production from multiple pools, list contribution of each pool as a percent of Total Volume. 6. Sold 70,652 Pool Name Pool Code Percent 7. Reinjected 8,999,116 Sadlerochit 640150 0.0% North Prudhoe Bay State 640152 0.0% 6. Flared or vented 1 hour or less 16 Point McIntyre 640180 52.4% Lisburne 640144 47.1% 9. Flared or vented more than 1 hour (see instr.) 0 Ivishak-SagRiver test in 640147 0.0% Niakuk 640148 0.4% 10. Pilot and Purge 11,408 West Beach 640186 0.0% 11. Assist Gas 126,616 12. Fuel gas used in lease operations. 792,189 13. Other (See instructions) 219,091 Use Onlyuctions) Authorization >7 hr: Safety MCF 14. TOTAL VOLUME (ITEMS 6.12) 10,219,088 Lease Use MCF 15. NGL Gas Equivalent 70,652 Conservation MCF 16. Purchased gas U Waste. MCF 17. Transferred from: 1,585,276 Commissioner Date 18. Transferred to: (Express as a negative #) p 19. Remarks: Block 13: Lift Gas Off Field; Block 17: MI from Prudhoe = 1,585,276 and Fuel Gas from Prudhoe = 0 1 hereby certify that the foregoigg is We and correct to the best of my knowledge. Note: All volumes must be corrected Signature �'I'x �� Title Mana er Production Taxes and R alties Alaska to pressure of 14.65psia and to a temperature of 60o F. Authority 20 Printed Name Diane Colley Phone (907) 564-5775 Date rQ AAC25.235. Form 10-422 Rev. 512009 INSTRUCTIONS ON REVERSE SIDE Submit in Duplicate Total flare r_ 1 Hour 8 Total Flare> 1 Hour Volume Flared Measured Safety Pilot 5,451 BP EXPLORATION ALASKA, INC, 61,012 TOTAL FLARED 66,471 CONSERVATION ORDER NO. 219 PRUDHOE BAY, LISBURNE LISBURNE PRODUCTION CENTER GAS FLARING INCIDENTS Jul -16 VOLUME PLANNED DATE TIME )MSCF) DESCRIPTION OF INCIDENTS B CAUSE UNPLANNED ACTION TAKEN TO ELIMINATE CAUSE 1826 refrigeration compressor shut down due to high ambient Adjustments made to the STV suction conditions. Scrubber backpressure control valve P019V started scrubber process as well as the assist gas 7/12/2016 13:08- 17:20 1 occasionally venting to LP flare. U system to mitigate smoke. P004V opened due to a high pressure on the reinjection Flare valve closed when pressure setpoint 7/31/2016 13:46- 13:47 7 suction to HP Flare. U was changed. Total flare r_ 1 Hour 8 Total Flare> 1 Hour Volume Flared Measured Safety Pilot 5,451 Continuous Assist 61,012 TOTAL FLARED 66,471 RP EXPLORATION ALASKA, INC, CONSERVATION ORDER NO. 229 PRUDHOE RAY, POINT MCINTYRE LISBURNE PRODUCTION CENTER GAS FLARING INCIDENTS Jul -16 VOLUME PLANNED DATE TIME (MSCF) DESCRIPTION OF INCIDENTS & CAUSE UNPLANNED ACTION TAKEN TO ELIMINATE CAUSE 7/31/2016 13:46- 13:47 Total Flare <=1 Hour 8 Total Flare a 1 Hour Volume Flared 8 Measured Safety Pilot 5,900 Continuous Assist 64,975 TOTAL FLARED 70,883 P004V opened due to a high pressure on the reinjection Flare valve closed when pressure setpoint suction to HP Flare. U was changed. BP EXPLORATION ALASKA, INC, CONSERVATION ORDER NO, 219 PRUDHOE BAY, COMBINED NIAKUK LISBURNE PRODUCTION CENTER GAS FLARING INCIDENTS Jul -16 VOLUME PLANNED DATE TIME (Mscf) DESCRIPTION OF INCIDENTS & CAUSE UNPLANNED ACTION TAKEN TO ELIMINATE CAUSE Total Flare <= 1 Hour 0 Total Flare > 1 Hour Volume Flared 0 Measured Safety Pilot 50 Continuous Assist 559 TOTALFLARED 609 BP EXPLORATION ALASKA, INC, CONSERVATION ORDER NO. 219 PRUDHOE BAY, RAVEN LISBURNE PRODUCTION CENTER GAS FLARING INCIDENTS Jul -16 VOLUME PLANNED DATE TIME (Mscf) DESCRIPTION OF INCIDENTS & CAUSE UNPLANNED ACTION TAKEN TO ELIMINATE CAUSE Total Flare <=1 Hour 0 Total Flare> 1 Hour Volume Flared 0 Measured Safety Pilot 2 Continuous Assist 19 TOTALFLARED 21 BP EXPLORATION ALASKA, INC, CONSERVATION ORDER NO. 219 PRUDHOE BAY, PRUDHOE LISBURNE PRODUCTION CENTER GAS FLARING INCIDENTS Jul -16 VOLUME PLANNED DATE TIME (Mscf( DESCRIPTION OF INCIDENTS & CAUSE UNPLANNED ACTION TAKEN TO ELIMINATE CAUSE Total Flare <= 1 Hour 0 Total Flare> 1 Hour Volume Flared Measured Safety Pilot 5 Continuous Assist 51 TOTAL FLARED 56 BP EXPLORATION ALASKA, INC, :ONSERVATION ORDER NO. 219 PRUDHOE BAY, NORTH PRUDHOE BAY LISBURNE PRODUCTION CENTER GAS FLARING INCIDENTS Jul -16 VOLUME PLANNED DATE TIME (MSCF) DESCRIPTION OF INCIDENTS & CAUSE UNPLANNED ACTION TAKEN TO ELIMINATE CAUSE Total Flare <=1 Hour 0 Total Flare > 1 Hour Volume Flared Measured Safety Pilot 0 Continuous Assist 0 TOTAL FLARED 0 BP EXPLORATION ALASKA, INC, CONSERVATION ORDER NO. 219 PRUDHOE BAY, WEST BEACH LISBURNE PRODUCTION CENTER GAS FLARING INCIDENTS Jul -10 VOLUME PLANNED DATE TIME (MSCF) DESCRIPTION OF INCIDENTS & CAUSE UNPLANNED ACTION TAKEN TO ELIMINATE CAUSE Total Flare c= I Hour 0 Total Fiore> 1 Hour Volume Flared Measured Safety Pilot Continuous Assist TOTAL FLARED 0 RECEIVED by AUG 12 2016 A,®GCC BP Exploration (Alaska)Inc. PO Box 196612 900 East Benson Boulevard Anchorage, Alaska 99 51 9-661 2 August 11, 2016 Recipients of the Lisburne Production Center Gas Disposition Report: Enclosed is the July 2016 LPC Facility Gas Disposition Report (AOGCC Form 10-422). Please call Anne Fiedler at (907) 564-5826 if you have any questions. Sincerely, 6v� T&J Diane Colley Manager, Production Taxes and Royalties Alaska Enclosures STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMMISSION FACILITY REPORT OF PRODUCED GAS DISPOSITION 1. Facility Number 0290000009 2. Facility Name PBU LISBURNE PROD GPMA 3. Field PBU - GPMA 4. Operator BP 5. MonihNear of Disposition August -2016 Disposition Volume MCF 20. Forproduchon from multiple pools, list contribution of each pool as a percent of Total Volume. 6. Sold 57,468 Pool Name Pool Code Percent 7. Reinjected 7,266,423 Sadlerochit 640150 0.0% North Prudhoe Bay State 640152 0.0% 8. Flared or vented 1 hour or less 1,084 Point McIntyre 640180 56.1% Lisburne 640144 43.2% 9 Flared or vented more than 1 hour (see instr.) 12,130 Ivlshak-SagRiver test in 640147 0.1% Niakuk 640148 0.6% 10. Pilot and Purge 11,439 West Beach 640186 0.0% 11, Assist Gas 121,164 12. Fuel gas used in lease operations. 679,143 13. Other (see instructions) 236,165 Oftial Use Only authorization >1 hr Safety 1�r 1_30 MCF lf% 14. TOTAL VOLUME (ITEMS 6.12) 8,385,016 Lease Use MCF 15. NGL Gas Equivalent 57,468 Conservation MCF 16. Purchased gas U Waste: MCF 17. Transferred from 1,029,085 Con inner Date 18. Transferred to: (Express as a negative 1k) D 19. Remarks: Block 13: Lift Gas Off Field; Block 17: MI from Prudhoe — 943,464 and Fuel Gas from Prudhoe = 85,621 1 hereby certify that Pe foregoing is true and correct to the best of my knowledge. ���j,(/n Note: All volumes must he corrected Signature �-""" L Title Manager Production Taxes and Royalties Alaska to pressure of 14.65 psis and to a temperature of 60o F, Authority 20 Printed Name Diane Colley Phone (907) 564-5775 Date AAC25.235. Fonn 10-422 Rev. 512009 INSTRUCTIONS ON REVERSE SIDE Submit in Duplicate BP EXPLORATION ALASKA, INC, CONSERVATION ORDER NO. 219 PRUDHOE BAY, LISBURNE LISBURNE PRODUCTION CENTER GAS FLARING INCIDENTS Aug -16 DATE 4,948 TIME 52,381 VOLUME (MSCF) DESCRIPTION OF INCIDENTS & CAUSE PLANNED UNPLANNED ACTION TAKEN TO ELIMINATE CAUSE 1808 reinjection compressor shutdown for water wash, IGV 8/25/2016 21:45 - 21:50 108 inspection, and sour seal oil trap cleanout. P 1808 T/C depressurized and shut down. 8/28/2016 01:10 - 01:14 85 1807 T/C planned shutdown to switch load to 1808. P 1807 T/C shutdown and depressured to 175 psig. 8/28/2016 01:34 - 01:37 6 1808 T/C depressured for check valve integrity test. P 1808 T/C completed check valve integrity test. 8/28/2016 11:16 - 11:17 3 1808 T/C depressured. P 1808 T/C depressure omplted. 8/29/2016 19:52 - 20:16 248 1808 shutdown for summer shutdown work. P 1808 t/C depressurized and shutdown. Total Flare r-1 Hour 450 8/29/2016 21:13 - 23:59 123 Depressuring plant. P Plant depressured for TAR. Depressuring of Plant, both gas lines and common lines 8/30/2016 00:01-23:59 3,307 continuing. P Plant depressured for TAR. Depressuring of Plant, both gas lines and common lines 8/31/2016 00:00-23:59 1,611 continuing. P Plant depressured for TAR. Total Flom >1 Hour 5,041 Volume Flared 5,491 Measured Safety Pilot 4,948 Continuous Assist 52,381 TOTALFLARED 62,820 BP EXPLORATION ALASKA, INC, CONSERVATION ORDER NO. 219 PRUDHOE BAY, POINT MCINTYRE LISBURNE PRODUCTION CENTER GAS FLARING INCIDENTS Aug -16 Total Flare c=1 Hour 628 8/29/2016 21:13 - 23:59 171 8/30/2016 00:01 -23:59 4,609 8/31/2016 00:00 -23:59 2,245 Total Flare > 1 Hour 7,025 Volume Flared 7,653 Measured Safety Pilot 6,414 Continuous Assist 67,969 VOLUME 82,036 PLANNED DATE TIME (MSCF) DESCRIPTION OF INCIDENTS & CAUSE UNPLANNED ACTION TAKEN TO ELIMINATE CAUSE 1808 reinjection compressor shutdown for water wash, IGV 8/25/2016 21:45 - 21:50 151 Inspection, and sour seal oil trap cleanout. P 1808 T/C depressurized and shut down. 8/28/2016 01:10 - 01:14 119 1807 T/C planned shutdown to switch load to 1808. P 1807 T/C shutdown and depressured to 175 psig. 8/28/2016 01:34 - 01:37 8 1808 T/C depressured for check valve integrity test. P 1808 T/C completed check valve integrity test. 8/28/2016 11:16 - 11:17 4 1808 T/C depressured. P 1808 T/C depressure omplted. 8/29/2016 19:52 - 20:16 346 1808 shutdown for summer shutdown work. P 1808 t/C depressurized and shutdown. Total Flare c=1 Hour 628 8/29/2016 21:13 - 23:59 171 8/30/2016 00:01 -23:59 4,609 8/31/2016 00:00 -23:59 2,245 Total Flare > 1 Hour 7,025 Volume Flared 7,653 Measured Safety Pilot 6,414 Continuous Assist 67,969 TOTAL FLARED 82,036 Depressuring plant. P Plant depressured for TAR. Depressuring of Plant, both gas lines and common lines continuing. P Plant depressured for TAR. Depressuring of Plant, both gas lines and common lines continuing. P Plant depressured for TAR. RP EXPLORATION ALASKA, INC, CONSERVATION ORDER NO. 219 PRUDHOE BAY, COMBINED NIAKUK LISBURNE PRODUCTION CENTER GAS FLARING INCIDENTS Aug -16 Total Flare r-1 Hour 5 8/29/2016 21:13 - 23:59 1 8/30/2016 00:01- 23:59 34 8/31/2016 00:00-23:59 17 Total Flare> 1 Hour 52 Volume Flared 57 Measured Safety Pilot 64 VOLUME 674 PLANNED 795 DATE TIME (Mscf) DESCRIPTION OF INCIDENTS & CAUSE UNPLANNED ACTION TAKEN TO ELIMINATE CAUSE 1808 reinjection compressor shutdown for water wash, IGV 8/25/2016 21:45 - 21:50 1 inspection, and sour seal oil trap cleanout. P 1808 T/C depressurized and shut down. 8/28/2016 01:10 - 01:14 1 1807 T/C planned shutdown to switch load to 1808. P 1807 T/C shutdown and depressured to 175 psig. 8/28/2016 01:34 - 01:37 0 1808 T/C depressured for check valve integrity test. P 1808 T/C completed check valve integrity test. 8/2812016 11:16 -11:17 0 1808 T/C depressured. P 1808 T/C depressure omplted. 8/29/2016 19:52 - 20:16 3 1808 shutdown for summer shutdown work. P 1808 t/C depressurized and shutdown. Total Flare r-1 Hour 5 8/29/2016 21:13 - 23:59 1 8/30/2016 00:01- 23:59 34 8/31/2016 00:00-23:59 17 Total Flare> 1 Hour 52 Volume Flared 57 Measured Safety Pilot 64 Continuous Assist 674 TOTALFLARED 795 Depressuring plant. P Plant depressured for TAR. Depressuring of Plant, both gas lines and common lines continuing. P Plant depressured for TAR. Depressuring of Plant, both gas lines and common lines continuing. P Plant depressured for TAR. BP EXPLORATION ALASKA, INC, CONSERVATION ORDER NO. 219 PRUDHOE BAY, RAVEN LISBURNE PRODUCTION CENTER GAS FLARING INCIDENTS Aug -16 Total Flare <=1 Hour 1 8/29/2016 21:13-23:59 0 8/30/2016 00:01-23:59 8 8/31/2016 00:00-23:59 4 Total Flare > I Hour 12 VOLUME 13 PLANNED 13 DATE TIME (Msct) DESCRIPTION OF INCIDENTS & CAUSE UNPLANNED ACTION TAKEN TO ELIMINATE CAUSE 1808 reinjection compressor shutdown for water wash, IGV 8/25/2016 21:45 - 21:50 0 inspection, and sour seal oil trap cleanout. P 1808 T/C depressurized and shut down. 8/28/2016 01:10 - 01:14 0 1807 T/C planned shutdown to switch load to 1808. P 1807 T/C shutdown and depressured to 175 psig. 8/28/2016 01:34 - 01:37 0 1808 T/C depressured for check valve integrity test. P 1808 T/C completed check valve integrity test. 8/28/2016 11:16 -11:17 0 1808 T/C depressured. P 1808 T/C depressure omplted. 8/29/2016 19:52 - 20:16 1 1808 shutdown for summer shutdown work. P 1808 t/C depressurized and shutdown. Total Flare <=1 Hour 1 8/29/2016 21:13-23:59 0 8/30/2016 00:01-23:59 8 8/31/2016 00:00-23:59 4 Total Flare > I Hour 12 Volume Flared 13 Measured Safety Pilot 13 Continuous Assist 140 TOTAL FLARED 166 Depressuring plant. P Plant depressured for TAR. Depressuring of Plant, both gas lines and common lines continuing. P Plant depressured for TAR. Depressuring of Plant, both gas lines and common lines continuing. P Plant depressured for TAR. BP EXPLORATION ALASKA, INC, CONSERVATION ORDER NO. 219 PRUDHOE BAY, PRUDHOE LISBURNE PRODUCTION CENTER GAS FLARING INCIDENTS Aug -16 VOLUME PLANNED DATE TIME (Mscfl DESCRIPTION OF INCIDENTS & CAUSE UNPLANNED ACTION TAKEN TO ELIMINATE CAUSE Total Flare <= 1 Hour 0 Total Flare> 1 Hour Volume Flared Measured Safety Pilot Continuous Assist TOTAL FLARED 0 BP EXPLORATION ALASKA, INC, CONSERVATION ORDER NO. 219 PRUDHOE BAY, NORTH PRUDHOE BAY LISBURNE PRODUCTION CENTER GAS FLARING INCIDENTS Aug -16 VOLUME PLANNED DATE TIME (MSCF) DESCRIPTION OF INCIDENTS & CAUSE UNPLANNED ACTION TAKEN TO ELIMINATE CAUSE Total Flare <= I Hour Total Flare> I Hour Volume Flared 0 Measured Safety Pilot Continuous Assist TOTALFLARED BP EXPLORATION ALASKA, INC, CONSERVATION ORDER NO. 219 PRUDHOE BAY, WEST BEACH LISBURNE PRODUCTION CENTER GAS FLARING INCIDENTS Aug -16 VOLUME PLANNED DATE TIME )MSCF) DESCRIPTION OF INCIDENTS & CAUSE UNPLANNED ACTION TAKEN TO ELIMINATE CAUSE Total Flare <_ 1 Hour 0 Total Flare> 1 Hour Volume Flared 0 Measured Safety Pilot Continuous Assist TOTALFLARED Link, Liz M (DOA) From: AKOpsProdEOCTL <AKOPSPCCEOCTL@bp.com> Sent: Friday, September 02, 2016 2:30 PM To: 'aogcc.reporting@alaska.gov' Cc: Loepp, Victoria T (DOA); Benson, Gary A; Arthur, Gregory; Schinagl, Werner; Fortenberry, Christopher; AK, HSSEE Env Adv East; AK, OPS GPMA Facility OTL; Glover, Robin; Buckbee, Rachel A; AK, OPS GPMA OSM; Bessler, Mark Subject: Flaring Event at LPC To: AOGCC Reporting CC: Victoria Loepp, AOGCC aogcc.reporting()alaska.gov From: Jennifer Blake, GPB Production Optimization Team Leader A flaring event occurred at LPC starting at 08/29/2016 21:13 and continuing through 08/29/2016 23:59 with a volume of 295 (MSCF). The event lasted for 166 minutes and was due to depressurizing the LPC plant and commonlines for planned maintenance. The event continued through the next day, 8/30/2016. A flaring event occurred at LPC, continuing from the previous day, starting at 08/30/2016 00:01 and continuing through 08/30/2016 23:59 with a volume of 7958 (MSCF). The event lasted for 1438 minutes and was due to depressurizing the LPC plant and commonlines for planned maintenance. The event continued through the next day, 8/31/2016. A flaring event occurred at LPC, continuing from the previous day, starting at 08/31/2016 00:00 and stopping at 08/31/2016 23:59 with a volume of 3877 (MSCF). The event lasted for 1439 minutes and was due to depressurizing the LPC plant for planned maintenance. The event stopped when the plant and commonlines were depressurized. Thanks, Jennifer Blake EOC Production Optimization Team Lead Office (907) 564-5926 Cell (907) 830-6204 Jennifer.blake(@bp.com September 13, 2016 RECEIVED by SEP 14 2016 AOGCC 0 BE Exploration (Alaska) Inc. PO Box 196612 900 East Benson Boulevard Anchorage, Alaska 995198612 Recipients of the Lisburne Production Center Gas Disposition Report: Enclosed is the August 2016 LPC Facility Gas Disposition Report (AOGCC Form 10-422). Please call Anne Fiedler at (907) 564-5826 it you have any questions. Sincerely, Ow 01 Diane Colley Manager, Production Taxes and Royalties Alaska Enclosures STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMMISSION FACILITY REPORT OF PRODUCED GAS DISPOSITION 1. Facility Number 0290000009 2. Facility Name PBU LISBURNE PROD (GPIMA) 3. Field PBU - GPMA 4. Operator BP 5. MonthNear of Disposition I Se tember-2016 Disposition Volume MCF 20. For production from multiple pools, list contribution of each pool as a percent of Total Volume, 6. Sold 2,164 Pool Name Pool Code Percent 7. Reinjected 3,160,839 Sadlerochit 640150 0.8% North Prudhoe Bay State 640152 0.0% 8. Flared or vented 1 hour or less 1,124 Point McIntyre 640180 37.0% Lisburne 640144 59.3% 9. Flared or vented more than 1 hour (see instr.) 408 Ivishak-SagRiver test In 640147 1.1% Niakuk 640148 1.9% 10. Pilot and Purge 10,936 West Beach 640186 0.0% 11. Assist Gas 96,690 12. Fuel gas used in lease operations. 238,988 13. Other (see instructions) 170,819 Official Use Only Authorization>1 hr: Safety � r2 Cl MCF i 17,,5T - 2'� 14. TOTAL VOLUME (ITEMS 6-12) 3,681,968 Lease Lease Use MCFF 15. NGL Gas Equivalent 2,164 Conservation MCF 16. Purchased gas 0 Waste: MCF 17. Transferred from: 322,726 Commissioner Date 18. Transferred to: (Express as a negative #) 0 19. Remarks: Block 13: Lift Gas Off Field; Block 17: MI from Prudhoe = 275,715 and Fuel Gas from Prudhoe = 47,011 1 hereby certify that the foregoing is true and correct to the best of my knowledge. Note: All volumes must be corrected Signature Title Manager Production Taxes and Royalties Alaska to pressure of 14.65 psis and to a J/ temperature of 60o F. Authority 20 Printed Name Diane ColleyPhone (907) 564-5775 Date / F //® AAC25.235. Form 10-422 Rev. M009 INSTRUCTIONS ON REVERSE SIDE Submit in Duplicate BP EXPLORATION ALASKA, INC, CONSERVATION ORDER NO. 219 PRUDHOE BAY, LISBURNE LISBURNE PRODUCTION CENTER GAS FLARING INCIDENTS Sep -16 9/20/2016 08:46-08:47 1 9/21/2016 13:39- 13:40 8 9/30/2016 09:39-09:53 628 Total Flom <= I Hour 695 9/21/2016 21:36 - 23:02 277 Total Flare> 1 Hour 277 Volume Flared 972 Measured Safety Pilot 7,139 Continuous Assist 57,455 TOTAL FLARED 65,566 Lowered the Set Point on 1801 to speed the turbine up and 1801 high suction pressure U lower the suction pressure VOLUME U Water wash complete PLANNED DATE TIME (MSCF( DESCRIPTION OF INCIDENTS & CAUSE UNPLANNED ACTION TAKEN TO ELIMINATE CAUSE 9/1/2016 00:20-00:25 31 Depressured plant and common lines P Depressured plant and common lines 9/4/2016 07:58 -08:00 19 Depressured 24" common line P Flare valve closed Relieve 5.5 lbs pressure between double block and bleed at West Dock in preparation for rolling the blind from PM2 to LPC 9/10/2016 10:04-10:19 1 for STP 36. U Pressure relieved 9/19/2016 20:25 - 23:37 7 Plant start up (6 one minute events) U Start plant 9/20/2016 08:46-08:47 1 9/21/2016 13:39- 13:40 8 9/30/2016 09:39-09:53 628 Total Flom <= I Hour 695 9/21/2016 21:36 - 23:02 277 Total Flare> 1 Hour 277 Volume Flared 972 Measured Safety Pilot 7,139 Continuous Assist 57,455 TOTAL FLARED 65,566 Lowered the Set Point on 1801 to speed the turbine up and 1801 high suction pressure U lower the suction pressure Water wash U Water wash complete 1808 reinjection compressor shut down by push button after operator found leak coming from a nipple on the fuel gas STOP push button was pushed, so this was a controlled shut system. U down 1807 shut down on low overhead seal oil tank level U Repaired seal oil level controls and restarted 1807 BP EXPLORATION ALASKA, INC, CONSERVATION ORDER NO. 219 PRUDHOE BAY, POINT MCINTYRE LISBURNE PRODUCTION CENTER GAS FLARING INCIDENTS Sep -I6 Total Flare c=1 Hour 359 9/21/2016 21:36-23:02 122 Total Flare> 1 Hour 122 Volume Flared 481 Measured Safety Pilot 3,317 Continuous Assist 35,621 TOTALFLARED 39,419 1807 shut down on low overhead seal oil tank level U Repaired seal oil level controls and restarted 1807 VOLUME PLANNED DATE TIME (MSCF) DESCRIPTION OF INCIDENTS & CAUSE UNPLANNED ACTION TAKEN TO ELIMINATE CAUSE 9/1/2016 00:20- 00:25 12 Depressured plant and common lines P Depressured plant and common lines 9/4/2016 07:58 -08:00 8 Depressured 24" common line P Flare valve closed Relieve 5.5 Has pressure between double block and bleed at West Dock in preparation for rolling the blind from PM2 to LPC 9/10/2016 10:04-10:19 0 for STP 36. U Pressure relieved 9/19/2016 20:25 - 23:37 3 Plant start up (6 one minute events) U Start plant Lowered the Set Point on 1801 to speed the turbine up and 9/20/2016 08:46-08:47 0 1803 high suction pressure U lower the suction pressure 9/21/2016 13:39-13:40 4 Water wash U Water wash complete STOP push button was pushed, so this was a controlled shut 9/30/2016 09:39-09:53 332 1808 reinjection compressor shut down by push button after op U down Total Flare c=1 Hour 359 9/21/2016 21:36-23:02 122 Total Flare> 1 Hour 122 Volume Flared 481 Measured Safety Pilot 3,317 Continuous Assist 35,621 TOTALFLARED 39,419 1807 shut down on low overhead seal oil tank level U Repaired seal oil level controls and restarted 1807 BP EXPLORATION ALASKA, INC, CONSERVATION ORDER NO. 219 PRUDHOE BAY, COM81NED NIAKUK LISBURNE PRODUCTION CENTER GAS FLARING INCIDENTS Sep -16 9/30/2016 09:39 - 09:53 28 Total Flare <.1 Hour 30 Total Flare> 1 Hour 0 Volume Flared 30 Measured Safety Pilot 281 VOLUME 1,881 PLANNED DATE TIME (Mscf) DESCRIPTION OF INCIDENTS & CAUSE UNPLANNED ACTION TAKEN TO ELIMINATE CAUSE 9/1/2016 00:20-00:25 1 Depressured plant and common lines P Depressured plant and common lines 9/4/2016 07:58- DB:D0 1 Depressured 24" common line P Flare valve closed 9/30/2016 09:39 - 09:53 28 Total Flare <.1 Hour 30 Total Flare> 1 Hour 0 Volume Flared 30 Measured Safety Pilot 281 Continuous Assist 1,881 TOTAL FLARED 2,192 1808 reinjection compressor shut down by push button after operator found leak coming from a nipple on the fuel gas STOP push button was pushed, so this was a controlled shut system. U down 1807 shut down on low overhead seal oil tank level U Repaired seal oil level controls and restarted 1807 BP EXPLORATION ALASKA, INC, CONSERVATION ORDER NO. 219 PRUDHOE BAY, RAVEN LISBURNE PRODUCTION CENTER GAS FLARING INCIDENTS Sep -16 9/30/2016 09:39-09:53 16 Total Flare 4=1 Hour 18 1808 reinjection compressor shut down by push button after op 9/21/2016 21:36- 23:02 9 1807 shut down on low overhead seal oil tank level Total Flare> I Hour 9 VOLUME 27 PLANNED DATE TIME (Mscf) DESCRIPTION OF INCIDENTS & CAUSE UNPLANNED ACTION TAKEN TO ELIMINATE CAUSE 9/1/2016 00:20-00:25 1 Depressured plant and common lines P Depressured plant and common lines 9/4/2016 07:58-08:00 1 Depressured 24" common line P Flare valve closed 9/30/2016 09:39-09:53 16 Total Flare 4=1 Hour 18 1808 reinjection compressor shut down by push button after op 9/21/2016 21:36- 23:02 9 1807 shut down on low overhead seal oil tank level Total Flare> I Hour 9 Volume Flared 27 Measured Safety Pilot 172 Continuous Assist 1,040 TOTAL FLARED 1,239 U STOP push button was pushed, so this was a controlled shut dov U Repaired seal oil level controls and restarted 1807 VOLUME DATE TIME 9/30/2016 09:39-09:53 22 Total Flare <= I Hour 22 Total Flare> I Hour 0 Volume Flared 22 Measured Safety Pilot 27 Continuous Assist 693 TOTALFLARED 742 BP EXPLORATION ALASKA, INC, CONSERVATION ORDER NO. 219 PRUDHOE BAY, PRUDHOE LISBURNE PRODUCTION CENTER GAS FLARING INCIDENTS Sep -16 INCIDENTS & CAUSE 1808 reinjection compressor shut down by push button after operator found leak coming from a nipple on the fuel gas system. PLANNED UNPLANNED ACTION TAKEN TO ELIMINATE CAUSE STOP push button was pushed, so this was a controlled shut U down SP EXPLORATION ALASKA, INC, CONSERVATION ORDER NO. 219 PRUDHOE BAY, NORTH PRUDHOE BAY LISBURNE PRODUCTION CENTER GAS FLARING INCIDENTS Sep -16 VOLUME PLANNED DATE TIME (MSCF) DESCRIPTION OF INCIDENTS & CAUSE UNPLANNED ACTION TAKEN TO ELIMINATE CAUSE Total Flare.I Hour 0 Total Flare > 1 Hour Volume Flared 0 Measured Safety Pilot Continuous Assist TOTALFLARED 0 BP EXPLORATION ALASKA, INC, CONSERVATION ORDER NO. 219 PRUDHOE BAY, WEST BEACH LISBURNE PRODUCTION CENTER GAS FLARING INCIDENTS Sep -16 VOLUME PLANNED DATE TIME (MSCF( DESCRIPTION OF INCIDENTS & CAUSE UNPLANNED ACTION TAKEN TO ELIMINATE CAUSE Total Flare <= I Hour 0 Total Flare > I Hour Volume Flared 0 Measured Safety Pilot Continuous Assist TOTALFLARED 0 by October 13, 2016 BP Exploration (Alaska)Inc. PO Box 196612 900 East Benson Boulevard Anchorage, Alaska 99519-6612 Recipients of the Lisburne Production Center Gas Disposition Report: Enclosed is the September 2016 LPC Facility Gas Disposition Report (AOGCC Form 10-422). Please call Anne Fiedler at (907) 564-5826 if you have any questions. Sincerely, Diane Colley Manager, Production Taxes and Royalties Alaska Enclosures Link, Liz M (DOA) From: AKOpsProcIEOCTL <AKOPSPCCEOCTL@bp.com> Sent: Thursday, September 22, 2016 10:24 AM To: 'aogcc.reporting@alaska.gov' Cc: Loepp, Victoria T (DOA); Benson, Gary A; Arthur, Gregory; Schinagl, Werner; Fortenberry, Christopher; AK, HSSEE Env Adv East; AK, OPS GPMA Facility OTL; Glover, Robin; Buckbee, Rachel A; AK, OPS GPMA OSM; Bessler, Mark Subject: Flaring Event at LPC To: AOGCC Reporting CC: Victoria Loepp, AOGCC aoqcc.reportinq(@alaska.gov From: Jennifer Blake, GPB Production Optimization Team Leader A flaring event occurred at LPC starting at 09/21/2016 21:36 and stopping at 09/21/2016 23:02 with a volume of 408 (MSCF). The event lasted for 86 minutes and was due to compressor 1807 shutdown due from low overhead seal oil tank level. The event stopped when the seal oil level controls were repaired and 1807 was restarted. Thanks, Jennifer Blake EOC Production Optimization Team Lead Office (907) 564-5926 Cell (907) 830-6204 Jennifer.blake@bp.com STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMMISSION FACILITY REPORT OF PRODUCED GAS DISPOSITION 1. Facility Number 0290000009 2. Facility Name PBU LISBURNE PROD GPMA 3. Field PBU - GPMA 4. Operator BP 5. Monthlyear of Disposition October -2016 Disposition Volume MCF 20. For production from multiple pools, list contribution of each pool as a percent of Total Volume. 6. Sold 103,809 Pool Name Pool Code Percent 7. Reinjected 9,630,230 Sadlerochit 640150 1.4% North Prudhoe Bay State 640152 0.0% 8. Flared or vented 1 hour or less 230 Point McIntyre 640180 38.3% Lisburne 640144 57.0%1 9. Flared or vented more than 1 hour (see instr.) 0 Ivishak-SagRiver test in 640147 1.2% Niakuk 640148 2.2% 10. Pilot and Purge 11,454 West Beach 640186 0.0% 11. Assist Gas 121,436 12. Fuel gas used in lease operations. 828,697 13. Other (see instructions) 1,407,409 Official Use Only Authorization>1 hr: Safety MCF 14. TOTAL VOLUME (ITEMS 6-12) 12,103,265 Lease Use MCF 15. NGL Gas Equivalent 103,809 Conservation MCF 16. Purchased gas 0 Waste: MCF 17. Transferred from: 927,456 Commissioner Date 18. Transferred to: (Express as a negative #) 0 19. Remarks: Block 13: Lift Gas Off Field; Block 17: Ml from Prudhoe = 927,456 and Fuel Gas from Prudhoe = 0 1 hereby certify that}pe /7 Signature i✓� foregoing is true and correct to the best of my knowledge. O Title Mana er Production Taxes an Ro allies Alaska Note: All volumes must be corrected to ressure of 14.65 Sia and to a temperature of 60o F. Authority 20 AAC25.235. p Printed Name Diane Colley Phone (907) 564-5775 Date t Form 10-422 Rev. 5/2009 INSTRUCTIONS ON REVERSE SIDE Submit in Duplicate BP EXPLORATION ALASKA, INC, CONSERVATION ORDER NO. 219 PRUDHOE BAY, LISBURNE LISBURNE PRODUCTION CENTER GAS FLARING INCIDENTS Oct -16 Total Flare c= 1 Hour 142 Total Flare > 1 Hour VOLUME Volume Flared PLANNED Measured Safety Pilot DATE TIME (MSCF) DESCRIPTION OF INCIDENTS & CAUSE UNPLANNED ACTION TAKEN TO ELIMINATE CAUSE 10/2/216 20:51 - 21:05 56 1808 shut down due to failure to light off U Restarted 1801 shut down due to high oil temp, restarted and shut down 10/31/2016 10:37 - 11:03 86 on low suction U Restarted Total Flare c= 1 Hour 142 Total Flare > 1 Hour 0 Volume Flared 142 Measured Safety Pilot 6,545 Continuous Assist 69,435 TOTALFLARED 76,122 BP EXPLORATION ALASKA, INC, CONSERVATION ORDER NO. 219 PRUDHOE BAY, POINT MCINTYRE LISBURNE PRODUCTION CENTER GAS FLARING INCIDENTS Ott -16 DATE VOLUME TIME (MSCF) DESCRIPTION OF INCIDENTS & CAUSE 10/2/216 20:51 - 21:05 14 1808 shut down due to failure to light off 1801 shut down due to high oil temp, restarted and shut 10/31/2016 10:37 - 11:03 60 down on low suction Total Flare <= 1 Hour 74 Total Flare > 1 Hour 0 Volume Flared 74 Measured Safety Pilot 4,359 Continuous Assist 46,169 TOTAL FLARED 50,602 PLANNED UNPLANNED ACTION TAKEN TO ELIMINATE CAUSE U Restarted U Restarted BP EXPLORATION ALASKA, INC, CONSERVATION ORDER NO. 219 PRUDHOE BAY, COMBINED NIAKUK LISBURNE PRODUCTION CENTER GAS FLARING INCIDENTS Oct -16 VOLUME DATE TIME (Mscf) DESCRIPTION OF INCIDENTS & CAUSE PLANNED UNPLANNED ACTION TAKEN TO ELIMINATE CAUSE 10/2/216 20:51 - 21:05 3 1808 shut down due to failure to light off U Restarted 1801 shut down due to high oil temp, restarted and shut 10/31/2016 10:37 - 11:03 3 down on low suction U Restarted Total Flare <= 1 Hour 6 Total Flare > 1 Hour 0 Volume Flared 6 Measured Safety Pilot 253 Continuous Assist 2,604 TOTAL FLARED 2,943 BP EXPLORATION ALASKA, INC, CONSERVATION ORDER NO. 219 PRUDHOE BAY, RAVEN LISBURNE PRODUCTION CENTER GAS FLARING INCIDENTS Oct -16 Total Flare <= 1 Hour 4 Total Flare> 1 Hour VOLUME Volume Flared PLANNED Measured Safety Pilot DATE TIME (Mscf) DESCRIPTION OF INCIDENTS & CAUSE UNPLANNED ACTION TAKEN TO ELIMINATE CAUSE 10/2/216 20:51 - 21:05 2 1808 shut down due to failure to light off U Restarted 1801 shut down due to high oil temp, restarted and shut 10/31/2016 10:37 - 11:03 2 down on low suction U Restarted Total Flare <= 1 Hour 4 Total Flare> 1 Hour 0 Volume Flared 4 Measured Safety Pilot 135 Continuous Assist 1,436 TOTAL FLARED 1,575 BP EXPLORATION ALASKA, INC, CONSERVATION ORDER NO. 219 PRUDHOE BAY, PRUDHOE LISBURNE PRODUCTION CENTER GAS FLARING INCIDENTS Oct -16 Total Flare <= 1 Hour 4 Total Flare> 1 Hour VOLUME Volume Flared PLANNED Measured Safety Pilot DATE TIME (Mscf) DESCRIPTION OF INCIDENTS & CAUSE UNPLANNED ACTION TAKEN TO ELIMINATE CAUSE 10/2/216 20:51 - 21:05 2 1808 shut down due to failure to light off U Restarted 1801 shut down due to high oil temp, restarted and shut down 10/31/2016 10:37 - 11:03 2 on low suction U Restarted Total Flare <= 1 Hour 4 Total Flare> 1 Hour 0 Volume Flared 4 Measured Safety Pilot 162 Continuous Assist 1,712 TOTALFLARED 1,878 BP EXPLORATION ALASKA, INC, CONSERVATION ORDER NO. 219 PRUDHOE BAY, NORTH PRUDHOE BAY LISBURNE PRODUCTION CENTER GAS FLARING INCIDENTS Oct -16 VOLUME PLANNED DATE TIME (MSCF) DESCRIPTION OF INCIDENTS & CAUSE UNPLANNED ACTION TAKEN TO ELIMINATE CAUSE Total Flare <= 1 Hour Total Fiore > 1 Hour Volume Flared Measured Safety Pilot Continuous Assist TOTALFLARED BP EXPLORATION ALASKA, INC, CONSERVATION ORDER NO. 219 PRUDHOE BAY, WEST BEACH LISBURNE PRODUCTION CENTER GAS FLARING INCIDENTS Oct -16 VOLUME PLANNED DATE TIME (MSCF) DESCRIPTION OF INCIDENTS & CAUSE UNPLANNED ACTION TAKEN TO ELIMINATE CAUSE Total Fiore <=1 Hour Total Flare > 1 Hour Volume Flared 0 Measured Safety Pilot Continuous Assist TOTALFLARED STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMMISSION FACILITY REPORT OF PRODUCED GAS DISPOSITION 1. Facility Number 0290000009 2. Facility Name PBU LISBURNE PROD GPMA 3. Field PBU - GPMA 4. Operator BP 5. MonthNear of Disposition November -2016 Disposition Volume MCF 20. Forproduction from multiple pools, list contribution of each pool as a percent of Total Volume. 6. Sold 109,296 Pool Name Pool Code Percent 7. Reinjected 9,906,326 Sadlerochit 640150 0.2% North Prudhoe Bay State 640152 0.0% 8. Flared or vented 1 hour or less 5,168 Point McIntyre 640180 33.6% Lisburne 640144 63.6% 9. Flared or vented more than 1 hour (see instr.) 0 Ivishak-SagRiver test in 640147 0.7% Niakuk 640148 1.9% 10. Pilot and Purge 11,050 West Beach 640186 0.0% 11. Assist Gas 117,423 12. Fuel gas used in lease operations. 863,384 13. Other (see instructions) 1,624,803 Official Use Only Authorization >1 hr: Safety MCF 14. TOTAL VOLUME (ITEMS 6.12) 12,637,450 Lease Use MCF 15. NGL Gas Equivalent 109,296 Conservation MCF 16. Purchased gas 0 Waste: MCF 17. Transferred from: 905,452 1 Commissioner Date 18. Transferred to: (Express as a negative #) 0 19. Remarks: Block 13: Lift Gas Off Field; Block 17: MI from Prudhoe = 905,452 and Fuel Gas from Prudhoe = 0 Pt McIntyre NGLs at CGF (gas equivalent) = 6808 mcf I hereby certify that the foregoing is true and correct to the best of my knowledge. Signature Qate0v Printed Name Diane Colley Title Manager Production Taxes and Royalties Alaska Phone (907) 564-5775 Date Note: All volumes must be corrected to pressure of 14.65 psis and to a temperature of 60o F. Authority 20 AAC25.235. Form 10-422 Rev. 512009 INSTRUCTIONS ON REVERSE SIDE Submit in Duplicate DECEIVED by DEC 15 2016 ,A®GCC 0 BP Exploration (Alaska)Inc. PO Box 196612 900 East Benson Boulevard December 14, 2016 Anchorage, Alaska 9951M612 Recipients of the Lisburne Production Center Gas Disposition Report: Enclosed is the November 2016 LPC Facility Gas Disposition Report (AOGCC Form 10-422). Please call Anne Fiedler at (907) 564-5826 if you have any questions. Sincerely, �tCUlcu A Diane Colley Manager, Production Taxes and Royalties Alaska Enclosures BP EXPLORATION ALASKA, INC, CONSERVATION ORDER NO. 219 PRUDHOE BAY, LISBURNE LISBURNE PRODUCTION CENTER GAS FLARING INCIDENTS Nov -16 VOLUME PLANNED DATE TIME (MSCF) DESCRIPTION OF INCIDENTS 9, CAUSE UNPLANNED ACTION TAKEN TO ELIMINATE CAUSE 11/17/2016 09:54-09:55 11/21/2016 16:02 - 16:59 3,400 Total Flare <=1 Hour 3,401 Total Flare> 1 Hour 0 Volume Flared 3,401 Measured Safety Pilot 7,016 Continuous Assist 74,540 TOTAL FLARED 84,957 1855 shutdown on low lubricator level alarrm 1807 reinjection compressor shutdown because of control/instrumentation failure associated with 43 horizontal turbine Started 1855 Field production was cut to lower gas production until 1807 T/C restarted BP EXPLORATION ALASKA, INC, :ONSERVATION ORDER NO. 219 PRUDHOE BAY, POINT MCINTYRE LISBURNE PRODUCTION CENTER GAS FLARING INCIDENTS Nov -16 VOLUME PLANNED DATE TIME (MSCF) DESCRIPTION OF INCIDENTS & CAUSE UNPLANNED ACTION TAKEN TO ELIMINATE CAUSE 11/17/2016 09:54-09:55 0 11/21/2016 16:02 - 16:59 1,621 Total Flare r 1 Hour 1,621 Total Flare > 1 Hour 0 Volume Flared 1,621 Measured Safety Pilot 3,723 Continuous Assist 39,572 TOTAL FLARED 44,916 1855 shutdown on low lubricator level alarrm 1607 reinjection compressor shutdown because of control/instrumentation failure associated with R3 horizontal turbine U Started 1855 Field production was cut to lower gas U production until 1807 T/C restarted BP EXPLORATION ALASKA, INC, CONSERVATION ORDER NO. 219 PRUDHOE BAY, COMBINED NIAKUK LISBURNE PRODUCTION CENTER GAS FLARING INCIDENTS Nov -16 VOLUME PLANNED DATE TIME (Mscf) DESCRIPTION OF INCIDENTS & CAUSE UNPLANNED ACOON TAKEN TO ELIMINATE CAUSE 11/17/2016 09:54 - 09:55 0 11/21/2016 16:02-16:59 109 Total Flare <=1 Hour 109 Total Flare > 1 Hour 0 Volume Flared 109 Measured Safety Pilot 213 Continuous Assist 2,263 TOTAL FLARED 2,585 1855 shutdown on low lubricator level alarrm 1807 reinjection compressor shutdown because of control/instrumentation failure associated with p3 horizontal turbine U Started 1855 Field production was cut to lower gas U production until 1807 T/C restarted BP EXPLORATION ALASKA, INC, :ONSERVATION ORDER NO. 219 PRUDHOE BAY, RAVEN LISBURNE PRODUCTION CENTER GAS FLARING INCIDENTS Nov -16 VOLUME PLANNED DATE TIME (Mscf) DESCRIPTION OF INCIDENTS & CAUSE UNPLANNED ACTION TAKEN TO ELIMINATE CAUSE 11/17/2016 09:54 - 09:55 0 11/21/2016 16:02 - 16:59 29 Total Flare <=1 Hour 29 Total Flare > 1 Hour 0 Volume Flared 29 Measured Safety Pilot 78 Continuous Assist 836 TOTALFLARED 943 1855 shutdown on low lubricator level alarrm 1807 reinjection compressor shutdown because of control/instrumentation failure associated with a3 horizontal turbine U Started 1855 Field production was cut to lower gas U production until 1807 T/C restarted BP EXPLORATION ALASKA, INC, CONSERVATION ORDER NO. 219 PRUDHOE BAY, PRUDHOE LISBURNE PRODUCTION CENTER GAS FLARING INCIDENTS Nov -I6 VOLUME PLANNED DATE TIME (MScf) DESCRIPTION OF INCIDENTS & CAUSE UNPLANNED ACTION TAKEN TO ELIMINATE CAUSE 11/17/2016 09:54-09:55 0 11/21/2016 16:02-16:59 8 Total Flare <= I Hour 8 Total Flare > 1 Hour 0 Volume Flared 8 Measured Safety Pilot 20 Continuous Assist 212 TOTALFLARED 240 1855 shutdown On low lubricator level alarrm 1807 reinjection compressor shutdown because of control/instrumentation failure associated with k3 horizontal turbine U Started 1855 Field production was cut to lower gas U production until 1807 T/C restarted BP EXPLORATION ALASKA, INC, :ONSERVATION ORDER NO. 219 PRUDHOE BAY, NORTH PRUDHOE BAY LISBURNE PRODUCTION CENTER GAS FLARING INCIDENTS Nov -36 VOLUME PLANNED DATE TIME )MSCF) DESCRIPTION OF INCIDENTS & CAUSE UNPLANNED ACTION TAKEN TO ELIMINATE CAUSE Total Flare <=1 Hour 0 Total Flom> 1 Hour Volume Flared D Measured Safety Pilot Continuous Assist TOTALFLARED BP EXPLORATION ALASKA, INC, CONSERVATION ORDER NO. 219 PRUDHOE BAY, WEST BEACH LISBURNE PRODUCTION CENTER GAS FLARING INCIDENTS Nov -16 VOLUME PLANNED DATE TIME (MSCF) DESCRIPTION OF INCIDENTS & CAUSE UNPLANNED ACTION TAKEN TO ELIMINATE CAUSE Total Flare <=1 Hour 0 Total Flare > 1 Hour Volume Flared 0 Measured Safety Pilot 0 Continuous Assist 0 TOTALFLARED STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMMISSION FACILITY REPORT OF PRODUCED GAS DISPOSITION 1. Facility Number 0290000009 2. Facility Name PBU LISBURNE PROD GPMA 3. Field PBU - GPMA 4. Operator BP 5. Mont hNear of Disposition December -2016 Disposition Volume MCF 20. Forproduction from multiple pools, list contribution of each pool as a percent of Total Volume. 6. Sold 117,294 Pool Name PoolCode Percent 7. Reinjected 9,933,147 Sadlerochit 640150 0.6% North Prudhoe Bay State 640152 0.0% 8. Flared or vented 1 hour or less 75 Point McIntyre 640180 27.6% Lisbume 640144 68.9% 9. Flared or vented more than 1 hour (see instr.) 4,114 Ivishak-SagRiver test in 640147 1.0% Niakuk 640148 1.9% 10. Pilot and Purge 11,501 West Beach 640186 0.0% 11. Assist Gas 121,524 12. Fuel gas used in lease operations. 898,171 13. Other (see instructions) 1,423,996 Official Use Only Authorization >1 hr: rLeU=se� MCF T-L14. TOTAL VOLUME (ITEMS 6-12) 12,509,82215. NGL Gas Equivalent 117,294 rvation MCF 16. Purchased gas 0 Waste: MCF 17. Transferred from: 1,052,001 3- Commissioner Date 18. Transferred to: (Express as a negative #) 0 19. Remarks: Block 13: Lift Gas Off Field; Block 17: MI from Prudhoe = 1,052,001 and Fuel Gas from Prudhoe = 0 Pt McIntyre NGLs at CGF (gas equivalent) = 9187 mcf I hereby certify that th INforegping is true and correct to the best of my knowledge. Note: All volumes must be corrected Signature _ [[.��11 + x ,/' Title Manacier Production Taxes and Royalties Alaska to pressure of 14.65 psis and to a temperature of 60o F. Authority 20 Printed Name Diane Colley Phone (907) 564-5775 Date / I , / AAC25.235. Form 10-422 Rev. 5/2009 INSTRUCTIONS ON REVERSE SIDE Submit in Duplicate BP EXPLORATION ALASKA, INC, CONSERVATION ORDER NO. 219 PRUDHOE BAY, LISBURNE LISBURNE PRODUCTION CENTER GAS FLARING INCIDENTS Dec -16 VOLUME DATE TIME (MSCF) DESCRIPTION OF INCIDENTS & CAUSE 12/31/2016 08:10 - 08:11 57 Failed start on 1807, no ignition in the combustion cans. Total Flare <=1 Hour 57 1807 reinjection compressor shutdown because of control/instrumentation failure associated with second state nozzle clevis. Initial 76 minute event (3635 mcf) followed by 4 12/30/2016 05:56 - 07:12 3,063 very short events (10 min, 479 mcf) over next 12 hours. Total Flare> 1 Hour 3,063 Volume Flared 3,120 Measured Safety Pilot 7,967 Continuous Assist 84,197 TOTALFLARED 95,284 PLANNED UNPLANNED ACTION TAKEN TO ELIMINATE CAUSE U 1807 de -pressure completed U Flare valve closed BP EXPLORATION ALASKA, INC, CONSERVATION ORDER NO. 219 PRUDHOE BAY, POINT MCINTYRE LISBURNE PRODUCTION CENTER GAS FLARING INCIDENTS Dec -16 VOLUME PLANNED DATE TIME (MSCF) DESCRIPTION OF INCIDENTS & CAUSE UNPLANNED ACTION TAKEN TO ELIMINATE CAUSE 12/31/2016 08:10 - 08:11 13 Failed start on 1807, no ignition in the combustion cans. U 1807 de -pressure completed Total Flare <=1 Hour 13 1807 reinjection compressor shutdown because of control/instrumentation failure associated with second state nozzle clevis. Initial 76 minute event (3635 mcf) followed by 12/30/2016 05:56 - 07:12 704 4 very short events (10 min, 479 mcf) over next 12 hours. U Flare valve closed Total Flare > 1 Hour 704 Volume Flared 717 Measured Safety Pilot 3,120 Continuous Assist 32,914 TOTALFLARED 36,751 BP EXPLORATION ALASKA, INC, CONSERVATION ORDER NO. 219 PRUDHOE BAY, COMBINED NIAKUK LISBURNE PRODUCTION CENTER GAS FLARING INCIDENTS Dec -16 Total Flare <=1 Hour 2 1807 reinjection compressor shutdown because of control/instrumentation failure associated with second state nozzle clevis. Initial 76 minute event (3635 mcf) followed by 12/30/2016 05:56 - 07:12 143 4 very short events (30 min, 479 mcf) over next 12 hours. U Flare valve closed Total Flare> 1 Hour 143 Volume Flared 145 Measured Safety Pilot 225 Continuous Assist 2,381 TOTALELARED 2,751 VOLUME PLANNED DATE TIME (Mscf) DESCRIPTION OF INCIDENTS & CAUSE UNPLANNED ACTION TAKEN TO ELIMINATE CAUSE 12/31/2016 08:10- 08:11 2 Failed start on 1807, no ignition in the combustion cans. U 1807 de -pressure completed Total Flare <=1 Hour 2 1807 reinjection compressor shutdown because of control/instrumentation failure associated with second state nozzle clevis. Initial 76 minute event (3635 mcf) followed by 12/30/2016 05:56 - 07:12 143 4 very short events (30 min, 479 mcf) over next 12 hours. U Flare valve closed Total Flare> 1 Hour 143 Volume Flared 145 Measured Safety Pilot 225 Continuous Assist 2,381 TOTALELARED 2,751 BP EXPLORATION ALASKA, INC, CONSERVATION ORDER NO. 219 PRUDHOE BAY, RAVEN LISBURNE PRODUCTION CENTER GAS FLARING INCIDENTS Dec -16 VOLUME DATE TIME (Mscf) DESCRIPTION OF INCIDENTS & CAUSE 12/31/2016 08:10-08:11 1 Failed start on 1807, no ignition in the combustion cans. Total Flare <= 1 Hour 1 1807 reinjection compressor shutdown because of control/instrumentation failure associated with second state nozzle clevis. Initial 76 minute event (3635 mcf) followed by 12/30/2016 05:56-07:1: 84 4 very short events (10 min, 479 mcf) over next 12 hours. Total Flare > 1 Hour 84 Volume Flared 85 Measured Safety Pilot 117 Continuous Assist 1,247 TOTALFLARED 1,449 PLANNED UNPLANNED ACTION TAKEN TO ELIMINATE CAUSE U 1807 de -pressure completed U Flare valve closed BP EXPLORATION ALASKA, INC, CONSERVATION ORDER NO. 219 PRUDHOE BAY, PRUDHOE LISBURNE PRODUCTION CENTER GAS FLARING INCIDENTS Dec -16 VOLUME PLANNED DATE TIME (Mscf) DESCRIPTION OF INCIDENTS & CAUSE UNPLANNED ACTION TAKEN TO ELIMINATE CAUSE 12/31/2016 08:10 - 08:11 2 Failed start on 1807, no ignition in the combustion cans. U 1807 de -pressure completed Total Flare r_ 1 Hour 2 1807 reinjection compressor shutdown because of control/instrumentation failure associated with second state nozzle clevis. Initial 76 minute event (3635 mci) followed by 4 12/30/2016 05:56 -07:12 120 very short events (10 min, 479 mcf) over next 12 hours. U Flare valve closed Total Flare > 1 Hour 120 Volume Flared 122 Measured Safety Pilot 72 Continuous Assist 785 TOTAL FLARED 979 January 13, 2017 BP Exploration (Alaska) Inc. PO Box 196612 900 East Benson Boulevard Anchorage, Alaska 99519-6612 Recipients of the Lisburne Production Center Gas Disposition Report: Enclosed is the December 2016 LPC Facility Gas Disposition Report (AOGCC Form 10-422). Please call Anne Fiedler at (907) 564-5826 if you have any questions. Sincerely, Diane ColleyIj Manager, Production Taxes and Royalties Alaska Enclosures Link, Liz M (DOA) From: AKOpsProcIEOCTL <AKOPSPCCEOCTL@bp.com> Sent: Wednesday, January 04, 2017 12:28 PM To: 'aogcc.reporting@alaska.gov' Cc: Loepp, Victoria T (DOA); Benson, Gary A; Arthur, Gregory; Schinagl, Werner; Fortenberry, Christopher; AK, HSSEE Env Adv East; AK, OPS GPMA Facility OTL; Glover, Robin; Buckbee, Rachel A; AK, OPS GPMA OSM; Bessler, Mark Subject: Flaring Event at LPC To: AOGCC Reporting CC: Victoria Loepp, AOGCC aoocc. reportino(c)alaska.gov From: Jennifer Blake, GPB Production Optimization Team Leader A flaring event occurred at LPC starting at 12/30/2016 05:56 and stopping at 12/30/2016 07:12 with a volume of 3635 (MSCF). The event lasted for 76 minutes and was due to 1807 reinjection compressor shutting down caused by a control/instrumentation failure associated with the second stage nozzle clevis. The event stopped when the flare valve reseated. Thanks, Jennifer Blake EOC Production Optimization Team Lead Office (907) 564-5926 Cell (907) 830-6204 Jennifer.blakePbp.com