Facility: PBU Lisburne Prod (GPMA)
Operator: BP EXPLORATION (ALASKA) INC.
STATE OF ALASKA
ALASKA OIL AND GAS CONSERVATION COMMISSION
FACILITY REPORT OF PRODUCED GAS DISPOSITION
1. Facility Number
0290000009
2. Facility Name
PBU LISBURNE PROD GPMA
3. Field
PBU - GPMA
4. Operator
BP
5. Month/Year of Disposition
I January -2016
Disposition
Volume MCF
20. For production from multiple pools, list contribution of each pool as a percent of
Total Volume.
6. Sold
111,173
Pool Name Pool Code Percent
7. Reinjected
10,929,599
Lisburne 640144 53.9%
West Beach 640186 0.0%
8. Flared or vented 1 hour or less
0
Sadlerochlt 640150 5.4%
Niakuk 640148 0.9%
9. Flared or vented more than 1 hour (see instr.)
0
Ivishak-SagRiver test in 640147 0.4%
Point Mclnt re 640180 39.4%
10. Pilot and Purge
11,668
North Prudhoe Bay State 1 640152 1 0.0%
11. Assist Gas
73,266
12. Fuel gas used in lease operations.
861,280
13. Other (see instructions)
240,041
Official Use Only
Authorization>i hr:
Safety
MCF
14. TOTAL VOLUME (ITEMS 6-12)
12,227,027
Lease Use
MCF
15. NGL Gas Equivalent
111,173
Conservation
MCF
16. Purchased gas
Waste:
MCF
17. Transferred from:
1,776,464
Commissioner Date
18. Transferred to: (Express as a negative #)
O
19. Remarks: Block 13: Lift Gas Off Field; Block 17: MI from Prudhoe = 1,776,464 and Fuel Gas from Prudhoe = 0
1 hereby certify that t foregoing is true and correct to the best of my knowledge.
Note: All volumes must be corrected
Signature Title Manager Production Taxes and Royalties Alaska to pressure of 14.65 psis and to a
/ temperature of 60o F. Authority 20
Printed Name Diane ColleyPhone (907) 564-5775 Date (� AAC25.235.
Form 10-422 Rev. 5/2009 INSTRUCTIONS ON REVERSE SIDE Submit in Duplicate
BP EXPLORATION ALASKA, INC,
CONSERVATION ORDER NO. 219
PRUDHOE BAY, LISBURNE
LISBURNE PRODUCTION CENTER
GAS FLARING INCIDENTS
Jan -16
VOLUME PLANNED
DATE TIME (MSCF) DESCRIPTION OF INCIDENTS & CAUSE UNPLANNED ACTION TAKEN TO ELIMINATE CAUSE
Total Flare <=1 Hour 0
Total Flare > I Hour 0
Volume Flared 0
Measured Safety Pilot 6,302
Continuous Assist 39,643
TOTAL FLARED 45,949
BP EXPLORATION ALASKA, INC,
CONSERVATION ORDER NO. 219
PRUDHOE BAY, POINT MCINTYRE
LISBURNE PRODUCTION CENTER
GAS FLARING INCIDENTS
Jan -36
VOLUME PLANNED
DATE TIME (MSCF( DESCRIPTION OF INCIDENTS & CAUSE UNPLANNED ACTION TAKEN TO ELIMINATE CAUSE
Total Flare c= 1 Hour 0
Total Flare > 1 Hour
Volume Flared
Measured Safety Pilot 4,582
Continuous Assist 28,644
TOTALFLARED 33,226
BP EXPLORATION ALASKA, INC,
CONSERVATION ORDER NO. 219
PRUDHOE BAY, COMBINED NIAKUK
LISBURNE PRODUCTION CENTER
GAS FLARING INCIDENTS
Ian -16
VOLUME PLANNED
DATE TIME (Mscf) DESCRIPTION OF INCIDENTS & CAUSE UNPLANNED ACTION TAKEN TO ELIMINATE CAUSE
Total Flare c= 1 Hour 0
Total Flare> 1 Hour
Volume Flared
Measured Safety Pilot 101
Continuous Assist 635
TOTALFLARED 736
BP EXPLORATION ALASKA, INC,
CONSERVATION ORDER NO. 219
PRUDHOE BAY, RAVEN
LISBURNE PRODUCTION CENTER
GAS FLARING INCIDENTS
Jan -16
VOLUME PLANNED
DATE TIME (Mscf) DESCRIPTION OF INCIDENTS & CAUSE UNPLANNED ACTION TAKEN TO ELIMINATE CAUSE
Total Flare <=1 Hour 0
Total Flare> 1 Hour
Volume Flared
Measured Safety Pilot 47
Continuous Assist 298
TOTAL FLARED 345
BP EXPLORATION ALASKA, INC,
CONSERVATION ORDER NO. 219
PRUDHOE BAY, PRUDHOE
LISBURNE PRODUCTION CENTER
GAS FLARING INCIDENTS
Jan -16
VOLUME PLANNED
DATE TIME (Mscf) DESCRIPTION OF INCIDENTS a CAUSE UNPLANNED ACTION TAKEN TO ELIMINATE CAUSE
Total Flare c=1 Hour 0
Total Flare> 1 Hour
Volume Flared
Measured Safety Pilot 636
Continuous Assist 4,046
TOTAL FLARED 4,682
BP EXPLORATION ALASKA, INC,
CONSERVATION ORDER NO. 219
PRUDHOE BAY, NORTH PRUDHOE BAY
LISBURNE PRODUCTION CENTER
GAS FLARING INCIDENTS
Jan -16
VOLUME PLANNED
DATE TIME (MSCF) DESCRIPTION OF INCIDENTS & CAUSE UNPLANNED ACTION TAKEN TO ELIMINATE CAUSE
Total Flare c=1 Hour 0
Total Flare> 1 Hour
Volume Flared
Measured Safety Pilot 0
Continuous Assist 0
TOTAL FLARED
BP EXPLORATION ALASKA, INC,
CONSERVATION ORDER NO. 219
PRUDHOE BAY, WEST BEACH
LISBURNE PRODUCTION CENTER
GAS FLARING INCIDENTS
]an -16
VOLUME PLANNED
DATE TIME (MSCF) DESCRIPTION OF INCIDENTS 8, CAUSE UNPLANNED ACTION TAKEN TO ELIMINATE CAUSE
Total Flare <=1 Hour 0
Total Flare> 1 Hour
Volume Flared
Measured Safety Pilot
Continuous Assist
TOTAL FLARED 0
STATE OF ALASKA
ALASKA OIL AND GAS CONSERVATION COMMISSION
FACILITY REPORT OF PRODUCED GAS DISPOSITION
1. Facility Number
0290000009
2. Facility Name
PBU LISBURNE PROD GPMA
3. Field
PBU - GPMA
4. Operator
BP
5. Month/Year of Disposition
February -2016
Disposition
Volume MCF
20. For production from multiple pools, list contribution of each pool as a percent of
Total Volume.
6. Sold
85,897
Pool Name Pool Code Percent
7. Reinjected
10,920,252
Lisburne 640144 39.6%
West Beach 640186 0.0%
8. Flared or vented 1 hour or less
0
Sadlerochlt 640150 9.6%
Niakuk 640148 0.3%
9. Flared or vented more than 1 hour (see instr.)
0
Ivishak-SagRiver test in 640147 0.2%
Point McIntyre 640180 50.3%
10. Pilot and Purge
10,803
North Prudhoe Bay State 640152 0.0%
11. Assist Gas
81,495
12. Fuel gas used in lease operations.
829,254
13. Other (see instructions)
236,388
Official Use Only
Authorization>1 hr:
Safety
MCF
14. TOTAL VOLUME (ITEMS 6-12)
12,174,089
Lease Use
MCF
15. NGL Gas Equivalent
95,897
Conservation
MCF
16. Purchased gas
Q
Waste:
MCF
17. Transferred from:
1,877,510
18. Transferred to: (Express as a negative #)
0
Commissioner Date
19. Remarks: Block 13: Lift Gas Off Field; Block 17: MI from Prudhoe = 1,877,510 and Fuel Gas from Prudhoe = 0
tt a foregoing is true and correct to the best of my knowledge.
1 hereby certify tha61n'
/ I!/1 1 '�f�/� Note: All volumes must be corrected
Signature _ 44` 1 lll,,,41-u1" Title Manager Production Taxes and Royalties Alaska to pressure of 14.65 psis and to a
temperature of 60o F. Authority 20
Printed Name Diane Colley// Phone (907) 564-5775 Date (� AAC25.235.
Form 10-422 Rev. 5/2009 INSTRUCTIONS ON REVERSE SIDE Submit in Duplicate
BP EXPLORATION ALASKA, INC,
CONSERVATION ORDER NO. 219
PRUDHOE BAY, LISBURNE
LISBURNE PRODUCTION CENTER
GAS FLARING INCIDENTS
Feb -16
VOLUME PLANNED
DATE TIME (MSCF( DESCRIPTION OF INCIDENTS & CAUSE UNPLANNED ACTION TAKEN TO ELIMINATE CAUSE
Total Flare .I Hour 0
Total Flare> 1 Hour 0
Volume Flared 0
Measured Safety Pilot 4,282
Continuous Assist 32,192
TOTALFLARED 36,474
BP EXPLORATION ALASKA, INC,
CONSERVATION ORDER NO. 219
PRUDHOE BAY, POINT MCINTYRE
LISBURNE PRODUCTION CENTER
GAS FLARING INCIDENTS
Feb -36
VOLUME PLANNED
DATE TIME (MSCF) DESCRIPTION OF INCIDENTS & CAUSE UNPLANNED ACTION TAKEN TO ELIMINATE CAUSE
Total Flare c= 1 Hour
Total Flare> 1 Hour
Volume Flared o
Measured Safety Pilot 5,438
Continuous Assist 41,034
TOTAL FLARED 46,472
BP EXPLORATION ALASKA, INC,
CONSERVATION ORDER NO. 219
PRUDHOE BAY, COMBINED NIAKUK
LISBURNE PRODUCTION CENTER
GAS FLARING INCIDENTS
Feb -16
VOLUME PLANNED
DATE TIME (Mstf) DESCRIPTION OF INCIDENTS & CAUSE UNPLANNED ACTION TAKEN TO ELIMINATE CAUSE
Total Flare . I Hour 0
Total Fiore> 1 Hour
Volume Flared
Measured Safety Pilot 36
Continuous Assist 264
TOTALFLARED 300
BP EXPLORATION ALASKA, INC,
CONSERVATION ORDER NO. 219
PRUDHOE BAY, RAVEN
LISBURNE PRODUCTION CENTER
GAS FLARING INCIDENTS
Feb -I6
VOLUME PLANNED
DATE TIME )Mscf) DESCRIPTION OF INCIDENTS & CAUSE UNPLANNED ACTION TAKEN TO ELIMINATE CAUSE
Total Flare <=1 Hour
Total Flare> 1 Hour
Volume Flared
Measured Safety Pilot 17
Continuous Assist 141
TOTALFLARED 158
BP EXPLORATION ALASKA, INC,
CONSERVATION ORDER NO. 219
PRUDHOE BAY, PRUDHOE
LISBURNE PRODUCTION CENTER
GAS FLARING INCIDENTS
Feb -16
VOLUME
PLANNED
DATE TIME (Mscf) DESCRIPTION OF INCIDENTS & CAUSE UNPLANNED ACTION TAKEN TO ELIMINATE CAUSE
Total Flare <= 1 Hour 0
Total Flare> 1 Hour
Volume Flared
Measured Safety Pilot 1,030
Continuous Assist 7,864
TOTALFLARED 8,894
BP EXPLORATION ALASKA, INC,
CONSERVATION ORDER NO. 219
PRUDHOE BAY, NORTH PRUDHOE BAY
LISBURNE PRODUCTION CENTER
GAS FLARING INCIDENTS
Feb -16
VOLUME PLANNED
DATE TIME )MSCF) DESCRIPTION OF INCIDENTS&CAUSE UNPLANNED ACTION TAKEN TO ELIMINATE CAUSE
Total Flare c= I Hour 0
Total Flare> 1 Hour
Volume Flared 0
Measured Safety Pilot 0
Continuous Assist 0
TOTAL FLARED 0
BP EXPLORATION ALASKA, INC,
CONSERVATION ORDER NO. 219
PRUDHOE BAY, WEST BEACH
LISBURNE PRODUCTION CENTER
GAS FLARING INCIDENTS
Feb -16
VOLUME PLANNED
DATE TIME (MSCF( DESCRIPTION OF INCIDENTS & CAUSE UNPLANNED ACTION TAKEN TO ELIMINATE CAUSE
Total Flom .I Hour 0
Total Flare > 1 Hour
Volume Flared
Measured Safety Pilot
Continuous Assist
TOTALFLARED 0
STATE OF ALASKA
ALASKA OIL AND GAS CONSERVATION COMMISSION
FACILITY REPORT OF PRODUCED GAS DISPOSITION
1. Facility Number2.
0290000009
Facility Name
PBU LISBURNE PROD GPMA
3. Field
PBU - GPMA
4. Operator
BP
5. Month/Year of Disposition
I March -2016
Disposition
Volume MCF
20. For production from multiple pools, list contribution of each pool as a percent of
Total Volume.
6. Sold
103,885
Pool Name Pool Code Percent
7. Reinjected
11,109,734
Lisburne 640144 42.2%
West Beach 640186 0.0%
8. Flared or vented 1 hour or less
1
Sadlerochit 640150 5.2%
Niakuk 640148 0.8%
9. Flared or vented more than 1 hour (see instr.)
0
Ivishak-SagRiver test in 640147 1.2%
Point McIntyre 640180 50.5%
10. Pilot and Purge
11,581
North Prudhoe Bay State 640152 0.0%
11. Assist Gas
116,092
12. Fuel gas used in lease operations.
844,338
13. Other (see instructions)
217,730
Use Onlyons)
Authorization >1 hr:
Safety
MCF
14. TOTAL VOLUME (ITEMS 6-12)
12,403,361
Lease Use
MCF
15. NGL Gas Equivalent
103,885
Conservation
MCF
16. Purchased gas
0
Waste:
MCF
17. Transferred from:
1,606,580
Commissioner Date
18. Transferred to: (Express as a negative #)
0
19. Remarks: Block 13: Lift Gas Off Field; Block 17: MI from Prudhoe = 1,606,580 and Fuel Gas from Prudhoe = 0
I hereby certify that t foregping is t ue and correct to the best of my knowledge.
///j/►/�,��� Note: All volumes must be corrected
Signature_ _ytcee-�i"/J Title Manager Production Taxes and R alties Alaska to pressure of 14.65 psis and to a
/ p / J temperature of 60o F. Authority 20
Printed Name Diane Colle f Phone (907) 564-5775 Date 7 0 6 AAC25.235.
'0116
Form 10-422 Rev. 5/2009 INSTRUCTIONS ON REVERSE SIDE Submit in Duplicate
BP EXPLORATION ALASKA, INC,
CONSERVATION ORDER NO. 219
PRUDHOE BAY, LISBURNE
LISBURNE PRODUCTION CENTER
GAS FLARING INCIDENTS
Mar -16
VOLUME PLANNED
DATE TIME (MSCF( DESCRIPTION OF INCIDENTS & CAUSE UNPLANNED ACTION TAKEN TO ELIMINATE CAUSE
Total Flare <=1 Hour 0
Total Rare> 1 Hour
Volume Flared
Measured Safety Pilot 4,924
Continuous Assist 49,505
TOTAL FLARED 54,429
BP EXPLORATION ALASKA, INC,
CONSERVATION ORDER NO. 219
PRUDHOE BAY, POINT MCINTYRE
LISBURNE PRODUCTION CENTER
GAS FLARING INCIDENTS
Mar -36
VOLUME PLANNED
DATE TIME (MSCF) DESCRIPTION OF INCIDENTS & CAUSE UNPLANNED ACTION TAKEN TO ELIMINATE CAUSE
3/11/2016 0330-0333 1 1803 discharge valve leaked and pressurized the compressor U 1801 T/C depressurization completed.
Total Flare <=1 Hour 1
Total Flare > 1 Hour
Volume Flared
Measured Safety Pilot 5,812
Continuous Assist 57,991
TOTALFLARED 63,884
BP EXPLORATION ALASKA, INC,
CONSERVATION ORDER NO. 219
PRUDHOE BAY, COMBINED NIAKUK
LISBURNE PRODUCTION CENTER
GAS FLARING INCIDENTS
Mar -I6
VOLUME PLANNED
DATE TIME IMscff DESCRIPTION OF INCIDENTS & CAUSE UNPLANNED ACTION TAKEN TO ELIMINATE CAUSE
Total Flare.I Hour 0
Total Flare> 1 Hour
Volume Flared
Measured Safety Pilot 98
Continuous Assist 971
TOTAL FLARED 1,069
BP EXPLORATION ALASKA, INC,
:ONSERVATION ORDER NO. 219
PRUDHOE BAY, RAVEN
LISBURNE PRODUCTION CENTER
GAS FLARING INCIDENTS
Mar -16
VOLUME PLANNED
DATE TIME IMscf) DESCRIPTION OF INCIDENTS & CAUSE UNPLANNED ACTION TAKEN TO ELIMINATE CAUSE
Total Flare <=1 Hour 0
Total Flare> 1 Hour
Volume Flared
Measured Safety Pilot 143
Continuous Assist 1,430
TOTAL FLARED 1,573
BP EXPLORATION ALASKA, INC,
CONSERVATION ORDER NO. 219
PRUDHOE BAY, PRUDHOE
LISBURNE PRODUCTION CENTER
GAS FLARING INCIDENTS
Mar46
VOLUME PLANNED
DATE TIME (Mstf( DESCRIPTION OF INCIDENTS & CAUSE UNPLANNED ACTION TAKEN TO ELIMINATE CAUSE
Total Flare <= 1 Hour
Total Flare> 1 Hour
Volume Flared
Measured Safety Pilot 604
Continuous Assist 6,195
TOTALFLARED 6,799
BP EXPLORATION ALASKA, INC,
CONSERVATION ORDER NO. 219
PRUDHOE BAY, NORTH PRUDHOE BAY
LISBURNE PRODUCTION CENTER
GAS FLARING INCIDENTS
Mar -I6
VOLUME PLANNED
DATE TIME (MSCF) DESCRIPTION OF INCIDENTS & CAUSE UNPLANNED ACTION TAKEN TO ELIMINATE CAUSE
Total Flare <=1 Hour 0
Total Flare> 1 Hour
Volume Flared
Measured Safety Pilot 0
Continuous Assist 0
TOTAL FLARED 0
BP EXPLORATION ALASKA, INC,
CONSERVATION ORDER NO. 219
PRUDHOE BAY, WEST BEACH
LISBURNE PRODUCTION CENTER
GAS FLARING INCIDENTS
Mar -16
VOLUME PLANNED
DATE TIME IMSCFI DESCRIPTION OF INCIDENTS & CAUSE UNPLANNED ACTION TAKEN TO ELIMINATE CAUSE
Total Flare <=1 Hour 0
Total Flare> 1 Hour
Volume Flared
Measured Safety Pilot
Continuous Assist
TOTAL FLARED D
RECEIVED by
APR 19 2016
.AOGCC 0
BP Exploration (Alaska) Inc.
PO Box 196612
900 East Benson Boulevard
Anchorage, Alaska 99519-6612
April 18, 2016
Recipients of the Lisburne Production Center Gas Disposition Report:
Enclosed is the March 2016 LPC Facility Gas Disposition Report (AOGCC Form
10-422).
Please call Anne Fiedler at (907) 564-5826 if you have any questions.
Sincerely,
AWO 1
7
Diane Colley
Manager, Production Taxes and Royalties Alaska
Enclosures
STATE OF ALASKA
ALASKA OIL AND GAS CONSERVATION COMMISSION
FACILITY REPORT OF PRODUCED GAS DISPOSITION
1. Facility Number
0290000009
2. Facility Name
PBU LISBURNE PROD GPMA
3. Field
PBU - GPMA
4. Operator
BP
5. MonthNear of Disposition
Aril -2016
Disposition
Volume MCF
20. For production from multiple pools, list contribution of each pool as a percent of
Total Volume.
6. Sold
76,751
Pool Name Pool Code Percent
7. Reinjected
9,761,920
Lisburne 640144 41.8%
West Beach 640186 0.0%
6. Flared or vented 1 hour or less
3
Sadlerochit 640150 2.9%
Niakuk 640148 0.9%
9. Flared or vented more than 1 hour (see instr.)
3,136
Ivishak-SagRiver test In 640147 0.8%
Point McIntyre 640180 53.5%
10. Pilot and Purge
11,170
North Prudhoe Bay State 640152 0.0%
11. Assist Gas
118,416
12. Fuel gas used in lease operations.
805,887
13. Other (see instructions)
157,956
Official Use Only
Authorization >i hr:
Safety
f
MCF V
/`I/
14. TOTAL VOLUME (ITEMS 6-12)
10,935,239
Lease Use
MCF
15. NGL Gas Equivalent
76,751
Conservation
MCF
16. Purchased gas
0
Waste:
MCF
17. Transferred from:
1,190,910
Commissioner Y Date
16. Transferred to: (Express as a negative fl)
0
19. Remarks: Block 13: Lift Gas Off Field; Block 17: MI from Prudhoe = 1,190,838 and Fuel Gas from Prudhoe = 72
1 hereby certify that the foregoing is true and correct to the best of my knowledge.
' I' //lr��M� Note: All volumes must be corrected
Signature libG��y!� Title Manager Production Taxes and Ro alties Alaska to pressure of 14.65 Asia and to a
temperature of 60o F. Authority 20
Printed Name Diane Colley Phone (907) 564-5775 Date /U/ AAC25.235.
Form 10-422 Rev. 5/2009 INSTRUCTIONS ON REVERSE SIDE Submit in Duplicate
BP EXPLORATION ALASKA, INC,
CONSERVATION ORDER NO. 219
PRUDHOE BAY, LISBURNE
LISBURNE PRODUCTION CENTER
GAS FLARING INCIDENTS
Apr -16
VOLUME PLANNED
DATE TIME (MSCF) DESCRIPTION OF INCIDENTS a CAUSE UNPLANNED ACTION TAKEN TO ELIMINATE CAUSE
4/9/2016 13:48 - 13:49
Total flare r_ 1 Hour 1
Loss of power generaation due to CPS trouble and 52-25
4/24/2016 06:35-14:59 1,395 breaker not opening.
Total Flore> 1 Hour
1,395
Volume Flared
1,396
Measured Safety Pilot
4,667
Continuous Assist
49,362
TOTALFLARED
55,425
Depressured and restarted plant
BP EXPLORATION ALASKA, INC,
CONSERVATION ORDER NO. 219
PRUDHOE BAY, POINT MCINTYRE
LISBURNE PRODUCTION CENTER
GAS FLARING INCIDENTS
Apr -I6
VOLUME PLANNED
DATE TIME (MSCF) DESCRIPTION OF INCIDENTS & CAUSE UNPLANNED ACTION TAKEN TO ELIMINATE CAUSE
4/9/2016 13:48 - 13:49
Total Flare <=1 Hour 2
Loss of power generaation due to CPS trouble and 52-25
4/24/2016 06:35 -14:59 1,588 breaker not opening. U Depressured and restarted plant
Total Flare> 1 Hour 1,588
Volume Flared 1,590
Measured Safety Pilot 5,982
Continuous Assist 63,537
TOTAL FLARED 71,109
BP EXPLORATION ALASKA, INC,
CONSERVATION ORDER NO. 219
PRUDHOE BAY, COMBINED NIAKUK
LISBURNE PRODUCTION CENTER
GAS FLARING INCIDENTS
Apr -36
VOLUME PLANNED
DATE TIME fMnf) DESCRIPTION OF INCIDENTS & CAUSE UNPLANNED ACTION TAKEN TO ELIMINATE CAUSE
Total Flare <=1 Hour 0
4/24/2016 06:35 - 14:59 35
Total Flare> i Hour 35
Volume Flared 35
Measured Safety Pilot 103
Continuous Assist 1,093
TOTAL FLARED 1,231
Loss of power generaation due to CPS trouble and 52-25
breaker not opening. U Depressured and restarted plant
BP EXPLORATION ALASKA, INC,
CONSERVATION ORDER NO. 219
PRUDHOE BAY, RAVEN
LISBURNE PRODUCTION CENTER
GAS FLARING INCIDENTS
Apr -16
VOLUME PLANNED
DATE TIME (Ni DESCRIPTION OF INCIDENTS & CAUSE UNPLANNED ACTION TAKEN TO ELIMINATE CAUSE
Total Flare <= 1 Hour 0
4/24/2016 06:35-14:59 21
Total Flare> 3 Hour 21
Volume Flared 21
Measured Safety Pilot 93
Continuous Assist 972
TOTAL FLARED 1,086
Loss of power generaation due to CPS trouble and 52-25
breaker not opening. U Depressured and restarted plant
BP EXPLORATION ALASKA, INC,
CONSERVATION ORDER NO. 219
PRUDHOE BAY, PRUDHOE
LISBURNE PRODUCTION CENTER
GAS FLARING INCIDENTS
Apr -16
VOLUME PLANNED
DATE TIME (Msof( DESCRIPTION OF INCIDENTS & CAUSE UNPLANNED ACTION TAKEN TO ELIMINATE CAUSE
Total Flare <= 2 Hour 0
4/24/2016 06:35-14:59 97
Total Flom, 1 Hour
97
Volume Flared
97
Measured Safety Pilot
325
Continuous Assist
3,452
TOTAL FLARED
3,874
Loss of power generaation due to CPS trouble and 52-25
breaker not opening.
Depressured and restarted plant
BP EXPLORATION ALASKA, INC,
:ONSERVATION ORDER NO. 219
PRUDHOE BAY, NORTH PRUDHOE BAY
LISBURNE PRODUCTION CENTER
GAS FLARING INCIDENTS
Apr -16
VOLUME PLANNED
DATE TIME (MSCF( DESCRIPTION OF INCIDENTS & CAUSE UNPLANNED ACTION TAKEN TO ELIMINATE CAUSE
Total Flare <=1 Hour 0
Total Flare > 1 Hour
Volume Flared
Measured Safety Pilot 0
Continuous Assist 0
TOTALFLARED
BP EXPLORATION ALASKA, INC,
CONSERVATION ORDER NO. 219
PRUDHOE BAY, WEST BEACH
LISBURNE PRODUCTION CENTER
GAS FLARING INCIDENTS
Apr -I6
VOLUME PLANNED
DATE TIME (MSCF) DESCRIPTION OF INCIDENTS & CAUSE UNPLANNED ACTION TAKEN TO ELIMINATE CAUSE
Total Flare <=1 Hour 0
Total Flare> 1 Hour
Volume Flared
Measured Safety Pilot 0
Continuous Assist 0
TOTALFLARED 0
Link, Liz M (DOA)
From: AK, OPS PCC EOC TL <AKOPSPCCEOCTL@bp.com>
Sent: Monday, April 25, 2016 6:15 PM
To: .aogcc.reporting @alaska.gov'
Cc: Loepp, Victoria T (DOA); Benson, Gary A; Arthur, Gregory; AK, OPS GC3&PCC OSM;
Martin, Nelson D; AK, HSSEE Env Adv East; AK, OPS GPMA Facility OTL; Glover, Robin;
Kain, Rachel B; AK, OPS GPMA OSM
Subject: Flaring Event at LPC
To: AOGCC Reporting CC: Victoria Loepp, AOGCC
aogcc reoorting(a-)alaskagov
From: Jennifer Blake, GPB Production Optimization Team Leader
A flaring event occurred at LPC starting at 04/24/2016 06:35 and stopping at 04/24/2016 14:59 with a volume of 3136
(MSCF). The event lasted for 504 minutes and was due to loss of power generation due to CPS Trouble and 52-25
breaker not opening. The event was intermittent and stopped when LPC depressured and restarted plant.
Thanks,
Jennifer Blake
PCC/EOC Production Optimization Team Lead (alt David Spall)
Office (907) 659-4472
Cell (907) 830-6204
Jennifer.blake@bp.com
STATE OF ALASKA
ALASKA OIL AND GAS CONSERVATION COMMISSION
FACILITY REPORT OF PRODUCED GAS DISPOSITION
1. Facility Number
0290000009
2. Facility Name
PBU LISBURNE PROD GPMA
3. Field
PBU - GPMA
4. Operator
BP
5. MonthNear of Disposition
May -2016
Disposition
Volume MCF
20. For production from multiple pools, list contribution of each pool as a percent of
Total Volume.
6. Sold
34,393
Pool Name Pool Code Percent
7. Reinjected
8,807,389
Lisburne 640144 38.00/0
West Beach 640186 0.0%
8. Flared or vented 1 hour or less
4
Sadlerochit 640150 2.4%
Niakuk 640148 1.0%
9. Flared or vented more than 1 hour (see instr.)
0
Ivishak-SagRiver test in 640147 0.6%
Point McIntyre 640180 58.0%
10. Pilot and Purge
11,361
North Prudhoe Ba State 640152 0.0%
11. Assist Gas
153,926
12. Fuel gas used in lease operations.
798,473
13. Other (see instructions)
223,619
- Official Use Only
Authorization>i hr:
Safety
MCF
14. TOTAL VOLUME (ITEMS 6-12)
10,029,165
Lease Use
MCF
15. NGL Gas Equivalent
34,393
Conservation
MCF
16. Purchased gas
U
Waste:
MCF
17. Transferred from:
318,141
1
Commissioner Date
18. Transferred to: (Express as a negative #)
0
19. Remarks: Block 13: Lift Gas Off Field; Block 17: Mf from Prudhoe = 318,141 and Fuel Gas from Prudhoe = 0
1 hereby certify that the f regoing is true and correct to the hest of my knowledge.
Note: All volumes must be corrected
Signature Title Manager Production Taxes a d R allies Alaska to pressure of 14.65 psis and to a
temperature of 60o F. Authority 20
Printed Name Diane ColleyPhone (907) 564-5775 Date 6 9/ AAC25.235.
Form 10-422 Rev. 512009 INSTRUCTIONS ON REVERSE SIDE Submit in Duplicate
BP EXPLORATION ALASKA, INC,
CONSERVATION ORDER NO. 219
PRUDHOE BAY, LISBURNE
LISBURNE PRODUCTION CENTER
GAS FLARING INCIDENTS
May -16
VOLUME PLANNED
DATE TIME )MSCF) DESCRIPTION OF INCIDENTS & CAUSE UNPLANNED ACTION TAKEN TO ELIMINATE CAUSE
5/19/2016 18:39 - 18:40 2 Over pressure of depropanizer on start up U Started 1855
Total Flare <= 1 Hour 2
Total Flare> 1 Hour
Volume Flared
Measured Safety Pilot 4,313
Continuous Assist 58,509
TOTAL FLARED 62,824
BP EXPLORATION ALASKA, INC,
CONSERVATION ORDER NO. 219
PRUDHOE BAY, POINT MCINTYRE
LISBURNE PRODUCTION CENTER
GAS FLARING INCIDENTS
May -16
VOLUME PLANNED
DATE TIME (MSCF) DESCRIPTION OF INCIDENTS & CAUSE UNPLANNED ACTION TAKEN TO ELIMINATE CAUSE
5/19/2016 18:39 -18:40 2 Over pressure of depropanizer on start up U Started 1855
Total Flare <=1 Hour 2
Total Flare> 1 Hour
Volume Flared
Measured Safety Pilot 6,591
Continuous Assist 89,243
TOTAL FLARED 95,836
BP EXPLORATION ALASKA, INC,
CONSERVATION ORDER NO. 219
PRUDHOE BAY, COMBINED NIAKUK
LISBURNE PRODUCTION CENTER
GAS FLARING INCIDENTS
May -16
VOLUME PLANNED
DATE TIME (Mscf) DESCRIPTION OF INCIDENTS & CAUSE UNPLANNED ACTION TAKEN TO ELIMINATE CAUSE
Total Flare <= I Hour
Total Flare> 1 Hour
Volume Flared 0
Measured Safety Pilot 112
Continuous Assist 1,524
TOTAL FLARED 1,636
BP EXPLORATION ALASKA, INC,
CONSERVATION ORDER NO. 219
PRUDHOE BAY, RAVEN
LISBURNE PRODUCTION CENTER
GAS FLARING INCIDENTS
May -16
VOLUME PLANNED
DATE TIME (Mscf( DESCRIPTION OF INCIDENTS & CAUSE UNPLANNED ACTION TAKEN TO ELIMINATE CAUSE
Total Flare <= 1 Hour 0
Total Flare> 1 Hour
Volume Flared
Measured Safety Pilot 69
Continuous Assist 934
TOTAL FLARED 1,003
BP EXPLORATION ALASKA, INC,
CONSERVATION ORDER NO. 219
PRUDHOE BAY, PRUDHOE
LISBURNE PRODUCTION CENTER
GAS FLARING INCIDENTS
May -16
VOLUME PLANNED
DATE TIME (Mscf( DESCRIPTION OF INCIDENTS & CAUSE UNPLANNED ACTION TAKEN TO ELIMINATE CAUSE
Total Flare <= I Hour 0
Total Flare > I Hour
Volume Flared
Measured Safety Pilot 276
Continuous Assist 3,716
TOTAL FLARED 3,992
BP EXPLORATION ALASKA, INC,
CONSERVATION ORDER NO. 219
PRUDHOE BAY, NORTH PRUDHOE BAY
LISBURNE PRODUCTION CENTER
GAS FLARING INCIDENTS
May -16
VOLUME PLANNED
DATE TIME IMSCF) DESCRIPTION OF INCIDENTS & CAUSE UNPLANNED ACTION TAKEN TO ELIMINATE CAUSE
Total Flare <=1 Hour 0
Total Flare> 1 Hour
Volume Flared
Measured Safety Pilot
Continuous Assist
TOTALFLARED
BP EXPLORATION ALASKA, INC,
CONSERVATION ORDER NO. 219
PRUDHOE BAY, WEST BEACH
LISBURNE PRODUCTION CENTER
GAS FLARING INCIDENTS
May -16
VOLUME PLANNED
DATE TIME (MSCF) DESCRIPTION OF INCIDENTS & CAUSE UNPLANNED ACTION TAKEN TO ELIMINATE CAUSE
Total Flare =1 Hour 0
Total Flare> 1 Hour
Volume Flared
Measured Safety Pilot 0
Continuous Assist 0
TOTALFLARED 0
STATE OF ALASKA
ALASKA OIL AND GAS CONSERVATION COMMISSION
FACILITY REPORT OF PRODl1CFD rAs n1!gPnS1T1nN
1. Facility Number
0290000009
2. Facility Name
PBU LISBURNE PROD GPMA
3. Field
PBU - GPMA
4. Operator •
BP
5. Month/Year of Disposition
I June -2016
Disposition
Volume MCF
20. For production from multiple pools, list contribution of each pool as a percent of
Total Volume.
6, Sold
79,097
Pool Name Pool Code Percent
7. Reinjected
8,473,100
Lisburne 640144 53.7%
West Beach 640186 0.0%
8. Flared or vented 1 hour or less
1
Sadlerochit 640150 0.0%
Niakuk 640148 0.6%
9. Flared or vented more than 1 hour (see instr.)
0
Ivishak-SagRiver test in 640147 0.2%
Point Mclnt re 640180 45.5%
10. Pilot and Purge
11,047
North Prudhoe Bay State 640152 0.0%
11. Assist Gas
133,113
12. Fuel gas used in lease operations.
800,304
13. Other (see instructions)
288,384
Official Use Only
Authorization >i he
Safety
MCF
14. TOTAL VOLUME (ITEMS 6.12)
9,785,046
Lease Use
MCF
15. NGL Gas Equivalent
79,097
Conservation
MCF
16. Purchased gas
0
Waste:
MCF
17. Transferred from:
881,446
Commissioner Date
18. Transferred to: (Express as a negative #)
0
19. Remarks: Block 13: Lift Gas Off Field; Block 17: MI from Prudhoe = 881,446 and Fuel Gas from Prudhoe = 0
1 hereby certify that the foregoing is true and correct to the best of my knowledge.
g W� L- �� . - Note: All volumes must be corrected
Si nature li!� Title Manager Production Taxes and Royalties Alaska to pressure of 14.65 psis and to a
fO r' temperature of 60o F. Authority 20
Printed Name Diane ColleyPhone (907) 564-5775 Date -L (o AAC25.235.
Form 10-422 Rev. 5/2009 INSTRUCTIONS ON REVERSE SIDE Submit in Duplicate
BP EXPLORATION ALASKA, INC,
CONSERVATION ORDER NO. 219
PRUDHOE BAY, LISBURNE
LISBURNE PRODUCTION CENTER
GAS FLARING INCIDENTS
lur,46
VOLUME PLANNED
DATE TIME (MSCF) DESCRIPTION OF INCIDENTS & CAUSE UNPLANNED ACTION TAKEN TO ELIMINATE CAUSE
Total Flare .2 Hour 0
Total Flare> 1 Hour
Volume Flared
Measured Safety Pilot 5,958
Continuous Assist 70,580
TOTAL FLARED 76,538
BP EXPLORATION ALASKA, INC,
CONSERVATION ORDER NO. 219
PRUDHOE BAY, POINT MCINTYRE
LISBURNE PRODUCTION CENTER
GAS FLARING INCIDENTS
Jun -16
VOLUME PLANNED
DATE TIME (MSCF) DESCRIPTION OF INCIDENTS & CAUSE UNPLANNED ACTION TAKEN TO ELIMINATE CAUSE
1 P019 -CV Flare valve on the STV Suction Scrubber vented due
6/13/2016 14:33 - 14:40 to process upset. U Flare valve closed.
Total Flare r_ 1 Hour 1
Total Flare> 1 Hour
Volume Flared
Measured Safety Pilot 5,006
Continuous Assist 51,520
TOTALFLARED 66,527
BP EXPLORATION ALASKA, INC,
CONSERVATION ORDER NO. 219
PRUDHOE BAY, COMBINED NIAKUK
L15BURNE PRODUCTION CENTER
GAS FLARING INCIDENTS
Jun -I6
VOLUME PLANNED
DATE TIME IMscfl DESCRIPTION OF INCIDENTS & CAUSE UNPLANNED ACTION TAKEN TO
Total Flare <= 3 Hour
Total Flare> 1 Hour
Volume Flared
Measured Safety Pilot 61
Continuous Assist 743
TOTALFLARED 804
BP EXPLORATION ALASKA, INC,
CONSERVATION ORDER NO. 219
PRUDHOE BAY, RAVEN
LISBURNE PRODUCTION CENTER
GAS FLARING INCIDENTS
Jun -16
VOLUME PLANNED
IMscfl DESCRIPTION OF INCIDENTS & CAUSE UNPLANNED ACTION TAKEN TO ELIMINATE CAUSE
Total Flare c 1 Hour 0
Total Flare> 1 Hour
Volume Flared
Measured Safety Pilot 20
Continuous Assist 235
TOTAL FLARED 255
BP EXPLORATION ALASKA, INC,
CONSERVATION ORDER NO. 219
PRUDHOE BAY, PRUDHOE
LISBURNE PRODUCTION CENTER
GAS FLARING INCIDENTS
Jun -16
VOLUME PLANNED
DATE TIME (Mscf) DESCRIPTION OF INCIDENTS & CAUSE UNPLANNED ACTION TAKEN TO ELIMINATE CAUSE
Total Flare c= 1 Hour 0
Total Flare> 1 Hour
Volume Flared
Measured Safety Pilot 2
Continuous Assist 35
TOTAL FLARED 37
BP EXPLORATION ALASKA, INC,
CONSERVATION ORDER NO. 219
PRUDHOE BAY, NORTH PRUDHOE BAY
LISBURNE PRODUCTION CENTER
GAS FLARING INCIDENTS
Jun -1B
VOLUME PLANNED
DATE TIME )MSCF) DESCRIPTION OF INCIDENTS & CAUSE UNPLANNED ACTION TAKEN TO ELIMINATE CAUSE
Total Flare <=1 Hour 0
Total Flare > I Hour
Volume Flared
Measured Safety Pilot 0
Continuous Assist 0
TOTALFLARED 0
BP EXPLORATION ALASKA, INC,
CONSERVATION ORDER NO. 219
PRUDHOE BAY, WEST BEACH
LISBURNE PRODUCTION CENTER
GAS FLARING INCIDENTS
Jun -16
VOLUME PLANNED
DATE TIME (MSCF) DESCRIPTION OF INCIDENTS & CAUSE UNPLANNED ACTION TAKEN TO ELIMINATE CAUSE
Total Flare <_ 1 Hour 0
Total Flare > 1 Hour
Volume Flared
Measured Safety Pilot
Continuous Assist
TOTALFLAREO
by
RECEIVES
JUl- 18 2016
OGCC
900 East Benson Boulevard
Anchorage, Alaska 99519-6612
July 15, 2016
Recipients of the Lisburne Production Center Gas Disposition Report:
Enclosed is the June 2016 LPC Facility Gas Disposition Report (AOGCC Form
10-422).
Please call Anne Fiedler at (907) 564-5826 if you have any questions.
Sincerely,
Diane Colley
Manager, Production Taxes and Royalties Alaska
Enclosures
STATE OF ALASKA
ALASKA OIL AND GAS CONSERVATION COMMISSION
FACILITY REPORT OF PRODUCED GAS DISPOSITION
1. Facility Number
0290000009
2. Facility Name
PBU LISBURNE PROD GPMA
3. Field
PBU - GPMA
4. Operator
BP
5. MonthNear of Disposition
July -2016
Disposition
Volume MCF
20. For production from multiple pools, list contribution of each pool as a percent of
Total Volume.
6. Sold
70,652
Pool Name Pool Code Percent
7. Reinjected
8,999,116
Sadlerochit 640150 0.0%
North Prudhoe Bay State 640152 0.0%
6. Flared or vented 1 hour or less
16
Point McIntyre 640180 52.4%
Lisburne 640144 47.1%
9. Flared or vented more than 1 hour (see instr.)
0
Ivishak-SagRiver test in 640147 0.0%
Niakuk 640148 0.4%
10. Pilot and Purge
11,408
West Beach 640186 0.0%
11. Assist Gas
126,616
12. Fuel gas used in lease operations.
792,189
13. Other (See instructions)
219,091
Use Onlyuctions)
Authorization >7 hr:
Safety
MCF
14. TOTAL VOLUME (ITEMS 6.12)
10,219,088
Lease Use
MCF
15. NGL Gas Equivalent
70,652
Conservation
MCF
16. Purchased gas
U
Waste.
MCF
17. Transferred from:
1,585,276
Commissioner Date
18. Transferred to: (Express as a negative #)
p
19. Remarks: Block 13: Lift Gas Off Field; Block 17: MI from Prudhoe = 1,585,276 and Fuel Gas from Prudhoe = 0
1 hereby certify that the foregoigg is We and correct to the best of my knowledge.
Note: All volumes must be corrected
Signature �'I'x �� Title Mana er Production Taxes and R alties Alaska to pressure of 14.65psia and to a
temperature of 60o F. Authority 20
Printed Name Diane Colley Phone (907) 564-5775 Date rQ AAC25.235.
Form 10-422 Rev. 512009 INSTRUCTIONS ON REVERSE SIDE Submit in Duplicate
Total flare r_ 1 Hour 8
Total Flare> 1 Hour
Volume Flared
Measured Safety Pilot
5,451
BP EXPLORATION ALASKA, INC,
61,012
TOTAL FLARED
66,471
CONSERVATION ORDER NO. 219
PRUDHOE BAY, LISBURNE
LISBURNE PRODUCTION CENTER
GAS FLARING INCIDENTS
Jul -16
VOLUME
PLANNED
DATE
TIME )MSCF)
DESCRIPTION OF INCIDENTS B CAUSE
UNPLANNED ACTION TAKEN TO ELIMINATE CAUSE
1826 refrigeration compressor shut down due to high ambient
Adjustments made to the STV suction
conditions. Scrubber backpressure control valve P019V started
scrubber process as well as the assist gas
7/12/2016
13:08- 17:20 1
occasionally venting to LP flare.
U system to mitigate smoke.
P004V opened due to a high pressure on the reinjection
Flare valve closed when pressure setpoint
7/31/2016
13:46- 13:47 7
suction to HP Flare.
U was changed.
Total flare r_ 1 Hour 8
Total Flare> 1 Hour
Volume Flared
Measured Safety Pilot
5,451
Continuous Assist
61,012
TOTAL FLARED
66,471
RP EXPLORATION ALASKA, INC,
CONSERVATION ORDER NO. 229
PRUDHOE RAY, POINT MCINTYRE
LISBURNE PRODUCTION CENTER
GAS FLARING INCIDENTS
Jul -16
VOLUME PLANNED
DATE TIME (MSCF) DESCRIPTION OF INCIDENTS & CAUSE UNPLANNED ACTION TAKEN TO ELIMINATE CAUSE
7/31/2016 13:46- 13:47
Total Flare <=1 Hour 8
Total Flare a 1 Hour
Volume Flared
8
Measured Safety Pilot
5,900
Continuous Assist
64,975
TOTAL FLARED
70,883
P004V opened due to a high pressure on the reinjection Flare valve closed when pressure setpoint
suction to HP Flare. U was changed.
BP EXPLORATION ALASKA, INC,
CONSERVATION ORDER NO, 219
PRUDHOE BAY, COMBINED NIAKUK
LISBURNE PRODUCTION CENTER
GAS FLARING INCIDENTS
Jul -16
VOLUME PLANNED
DATE TIME (Mscf) DESCRIPTION OF INCIDENTS & CAUSE UNPLANNED ACTION TAKEN TO ELIMINATE CAUSE
Total Flare <= 1 Hour 0
Total Flare > 1 Hour
Volume Flared 0
Measured Safety Pilot 50
Continuous Assist 559
TOTALFLARED 609
BP EXPLORATION ALASKA, INC,
CONSERVATION ORDER NO. 219
PRUDHOE BAY, RAVEN
LISBURNE PRODUCTION CENTER
GAS FLARING INCIDENTS
Jul -16
VOLUME PLANNED
DATE TIME (Mscf) DESCRIPTION OF INCIDENTS & CAUSE UNPLANNED ACTION TAKEN TO ELIMINATE CAUSE
Total Flare <=1 Hour 0
Total Flare> 1 Hour
Volume Flared 0
Measured Safety Pilot 2
Continuous Assist 19
TOTALFLARED 21
BP EXPLORATION ALASKA, INC,
CONSERVATION ORDER NO. 219
PRUDHOE BAY, PRUDHOE
LISBURNE PRODUCTION CENTER
GAS FLARING INCIDENTS
Jul -16
VOLUME PLANNED
DATE TIME (Mscf( DESCRIPTION OF INCIDENTS & CAUSE UNPLANNED ACTION TAKEN TO ELIMINATE CAUSE
Total Flare <= 1 Hour 0
Total Flare> 1 Hour
Volume Flared
Measured Safety Pilot 5
Continuous Assist 51
TOTAL FLARED 56
BP EXPLORATION ALASKA, INC,
:ONSERVATION ORDER NO. 219
PRUDHOE BAY, NORTH PRUDHOE BAY
LISBURNE PRODUCTION CENTER
GAS FLARING INCIDENTS
Jul -16
VOLUME PLANNED
DATE TIME (MSCF) DESCRIPTION OF INCIDENTS & CAUSE UNPLANNED ACTION TAKEN TO ELIMINATE CAUSE
Total Flare <=1 Hour 0
Total Flare > 1 Hour
Volume Flared
Measured Safety Pilot 0
Continuous Assist 0
TOTAL FLARED 0
BP EXPLORATION ALASKA, INC,
CONSERVATION ORDER NO. 219
PRUDHOE BAY, WEST BEACH
LISBURNE PRODUCTION CENTER
GAS FLARING INCIDENTS
Jul -10
VOLUME PLANNED
DATE TIME (MSCF) DESCRIPTION OF INCIDENTS & CAUSE UNPLANNED ACTION TAKEN TO ELIMINATE CAUSE
Total Flare c= I Hour 0
Total Fiore> 1 Hour
Volume Flared
Measured Safety Pilot
Continuous Assist
TOTAL FLARED 0
RECEIVED
by
AUG 12 2016
A,®GCC
BP Exploration (Alaska)Inc.
PO Box 196612
900 East Benson Boulevard
Anchorage, Alaska 99 51 9-661 2
August 11, 2016
Recipients of the Lisburne Production Center Gas Disposition Report:
Enclosed is the July 2016 LPC Facility Gas Disposition Report (AOGCC Form
10-422).
Please call Anne Fiedler at (907) 564-5826 if you have any questions.
Sincerely,
6v� T&J
Diane Colley
Manager, Production Taxes and Royalties Alaska
Enclosures
STATE OF ALASKA
ALASKA OIL AND GAS CONSERVATION COMMISSION
FACILITY REPORT OF PRODUCED GAS DISPOSITION
1. Facility Number
0290000009
2. Facility Name
PBU LISBURNE PROD GPMA
3. Field
PBU - GPMA
4. Operator
BP
5. MonihNear of Disposition
August -2016
Disposition
Volume MCF
20. Forproduchon from multiple pools, list contribution of each pool as a percent of
Total Volume.
6. Sold
57,468
Pool Name Pool Code Percent
7. Reinjected
7,266,423
Sadlerochit 640150 0.0%
North Prudhoe Bay State 640152 0.0%
8. Flared or vented 1 hour or less
1,084
Point McIntyre 640180 56.1%
Lisburne 640144 43.2%
9 Flared or vented more than 1 hour (see instr.)
12,130
Ivlshak-SagRiver test in 640147 0.1%
Niakuk 640148 0.6%
10. Pilot and Purge
11,439
West Beach 640186 0.0%
11, Assist Gas
121,164
12. Fuel gas used in lease operations.
679,143
13. Other (see instructions)
236,165
Oftial Use Only
authorization >1 hr
Safety
1�r 1_30
MCF lf%
14. TOTAL VOLUME (ITEMS 6.12)
8,385,016
Lease Use
MCF
15. NGL Gas Equivalent
57,468
Conservation
MCF
16. Purchased gas
U
Waste:
MCF
17. Transferred from
1,029,085
Con inner Date
18. Transferred to: (Express as a negative 1k)
D
19. Remarks: Block 13: Lift Gas Off Field; Block 17: MI from Prudhoe — 943,464 and Fuel Gas from Prudhoe = 85,621
1 hereby certify that Pe foregoing is true and correct to the best of my knowledge.
���j,(/n Note: All volumes must he corrected
Signature �-""" L Title Manager Production Taxes and Royalties Alaska to pressure of 14.65 psis and to a
temperature of 60o F, Authority 20
Printed Name Diane Colley Phone (907) 564-5775 Date AAC25.235.
Fonn 10-422 Rev. 512009 INSTRUCTIONS ON REVERSE SIDE Submit in Duplicate
BP EXPLORATION ALASKA, INC,
CONSERVATION ORDER NO. 219
PRUDHOE BAY, LISBURNE
LISBURNE PRODUCTION CENTER
GAS FLARING INCIDENTS
Aug -16
DATE
4,948
TIME
52,381
VOLUME
(MSCF)
DESCRIPTION OF INCIDENTS & CAUSE
PLANNED
UNPLANNED
ACTION TAKEN TO ELIMINATE CAUSE
1808 reinjection compressor shutdown for water wash, IGV
8/25/2016
21:45
- 21:50
108
inspection, and sour seal oil trap cleanout.
P
1808 T/C depressurized and shut down.
8/28/2016
01:10
- 01:14
85
1807 T/C planned shutdown to switch load to 1808.
P
1807 T/C shutdown and depressured to 175 psig.
8/28/2016
01:34
- 01:37
6
1808 T/C depressured for check valve integrity test.
P
1808 T/C completed check valve integrity test.
8/28/2016
11:16
- 11:17
3
1808 T/C depressured.
P
1808 T/C depressure omplted.
8/29/2016
19:52
- 20:16
248
1808 shutdown for summer shutdown work.
P
1808 t/C depressurized and shutdown.
Total Flare
r-1 Hour
450
8/29/2016
21:13
- 23:59
123
Depressuring plant.
P
Plant depressured for TAR.
Depressuring of Plant, both gas lines and common lines
8/30/2016
00:01-23:59
3,307
continuing.
P
Plant depressured for TAR.
Depressuring of Plant, both gas lines and common lines
8/31/2016
00:00-23:59
1,611
continuing.
P
Plant depressured for TAR.
Total Flom >1 Hour 5,041
Volume Flared 5,491
Measured Safety Pilot
4,948
Continuous Assist
52,381
TOTALFLARED
62,820
BP EXPLORATION ALASKA, INC,
CONSERVATION ORDER NO. 219
PRUDHOE BAY, POINT MCINTYRE
LISBURNE PRODUCTION CENTER
GAS FLARING INCIDENTS
Aug -16
Total Flare c=1 Hour 628
8/29/2016 21:13 - 23:59 171
8/30/2016 00:01 -23:59 4,609
8/31/2016 00:00 -23:59 2,245
Total Flare > 1 Hour 7,025
Volume Flared 7,653
Measured Safety Pilot
6,414
Continuous Assist
67,969
VOLUME
82,036
PLANNED
DATE
TIME
(MSCF)
DESCRIPTION OF INCIDENTS & CAUSE
UNPLANNED
ACTION TAKEN TO ELIMINATE CAUSE
1808 reinjection compressor shutdown for water wash, IGV
8/25/2016
21:45
- 21:50
151
Inspection, and sour seal oil trap cleanout.
P
1808 T/C depressurized and shut down.
8/28/2016
01:10
- 01:14
119
1807 T/C planned shutdown to switch load to 1808.
P
1807 T/C shutdown and depressured to 175 psig.
8/28/2016
01:34
- 01:37
8
1808 T/C depressured for check valve integrity test.
P
1808 T/C completed check valve integrity test.
8/28/2016
11:16
- 11:17
4
1808 T/C depressured.
P
1808 T/C depressure omplted.
8/29/2016
19:52
- 20:16
346
1808 shutdown for summer shutdown work.
P
1808 t/C depressurized and shutdown.
Total Flare c=1 Hour 628
8/29/2016 21:13 - 23:59 171
8/30/2016 00:01 -23:59 4,609
8/31/2016 00:00 -23:59 2,245
Total Flare > 1 Hour 7,025
Volume Flared 7,653
Measured Safety Pilot
6,414
Continuous Assist
67,969
TOTAL FLARED
82,036
Depressuring plant. P Plant depressured for TAR.
Depressuring of Plant, both gas lines and common lines
continuing. P Plant depressured for TAR.
Depressuring of Plant, both gas lines and common lines
continuing. P Plant depressured for TAR.
RP EXPLORATION ALASKA, INC,
CONSERVATION ORDER NO. 219
PRUDHOE BAY, COMBINED NIAKUK
LISBURNE PRODUCTION CENTER
GAS FLARING INCIDENTS
Aug -16
Total Flare r-1 Hour 5
8/29/2016 21:13 - 23:59 1
8/30/2016 00:01- 23:59 34
8/31/2016 00:00-23:59 17
Total Flare> 1 Hour 52
Volume Flared 57
Measured Safety Pilot
64
VOLUME
674
PLANNED
795
DATE
TIME
(Mscf)
DESCRIPTION OF INCIDENTS & CAUSE
UNPLANNED ACTION TAKEN TO ELIMINATE CAUSE
1808 reinjection compressor shutdown for water wash, IGV
8/25/2016
21:45 - 21:50
1
inspection, and sour seal oil trap cleanout.
P
1808 T/C depressurized and shut down.
8/28/2016
01:10 - 01:14
1
1807 T/C planned shutdown to switch load to 1808.
P
1807 T/C shutdown and depressured to 175 psig.
8/28/2016
01:34 - 01:37
0
1808 T/C depressured for check valve integrity test.
P
1808 T/C completed check valve integrity test.
8/2812016
11:16 -11:17
0
1808 T/C depressured.
P
1808 T/C depressure omplted.
8/29/2016
19:52 - 20:16
3
1808 shutdown for summer shutdown work.
P
1808 t/C depressurized and shutdown.
Total Flare r-1 Hour 5
8/29/2016 21:13 - 23:59 1
8/30/2016 00:01- 23:59 34
8/31/2016 00:00-23:59 17
Total Flare> 1 Hour 52
Volume Flared 57
Measured Safety Pilot
64
Continuous Assist
674
TOTALFLARED
795
Depressuring plant. P Plant depressured for TAR.
Depressuring of Plant, both gas lines and common lines
continuing. P Plant depressured for TAR.
Depressuring of Plant, both gas lines and common lines
continuing. P Plant depressured for TAR.
BP EXPLORATION ALASKA, INC,
CONSERVATION ORDER NO. 219
PRUDHOE BAY, RAVEN
LISBURNE PRODUCTION CENTER
GAS FLARING INCIDENTS
Aug -16
Total Flare <=1 Hour 1
8/29/2016 21:13-23:59 0
8/30/2016 00:01-23:59 8
8/31/2016 00:00-23:59 4
Total Flare > I Hour
12
VOLUME
13
PLANNED
13
DATE
TIME
(Msct)
DESCRIPTION OF INCIDENTS & CAUSE
UNPLANNED ACTION TAKEN TO ELIMINATE CAUSE
1808 reinjection compressor shutdown for water wash, IGV
8/25/2016
21:45 - 21:50
0
inspection, and sour seal oil trap cleanout.
P
1808 T/C depressurized and shut down.
8/28/2016
01:10 - 01:14
0
1807 T/C planned shutdown to switch load to 1808.
P
1807 T/C shutdown and depressured to 175 psig.
8/28/2016
01:34 - 01:37
0
1808 T/C depressured for check valve integrity test.
P
1808 T/C completed check valve integrity test.
8/28/2016
11:16 -11:17
0
1808 T/C depressured.
P
1808 T/C depressure omplted.
8/29/2016
19:52 - 20:16
1
1808 shutdown for summer shutdown work.
P
1808 t/C depressurized and shutdown.
Total Flare <=1 Hour 1
8/29/2016 21:13-23:59 0
8/30/2016 00:01-23:59 8
8/31/2016 00:00-23:59 4
Total Flare > I Hour
12
Volume Flared
13
Measured Safety Pilot
13
Continuous Assist
140
TOTAL FLARED
166
Depressuring plant. P Plant depressured for TAR.
Depressuring of Plant, both gas lines and common lines
continuing. P Plant depressured for TAR.
Depressuring of Plant, both gas lines and common lines
continuing. P Plant depressured for TAR.
BP EXPLORATION ALASKA, INC,
CONSERVATION ORDER NO. 219
PRUDHOE BAY, PRUDHOE
LISBURNE PRODUCTION CENTER
GAS FLARING INCIDENTS
Aug -16
VOLUME
PLANNED
DATE TIME (Mscfl DESCRIPTION OF INCIDENTS & CAUSE UNPLANNED ACTION TAKEN TO ELIMINATE CAUSE
Total Flare <= 1 Hour 0
Total Flare> 1 Hour
Volume Flared
Measured Safety Pilot
Continuous Assist
TOTAL FLARED 0
BP EXPLORATION ALASKA, INC,
CONSERVATION ORDER NO. 219
PRUDHOE BAY, NORTH PRUDHOE BAY
LISBURNE PRODUCTION CENTER
GAS FLARING INCIDENTS
Aug -16
VOLUME PLANNED
DATE TIME (MSCF) DESCRIPTION OF INCIDENTS & CAUSE UNPLANNED ACTION TAKEN TO ELIMINATE CAUSE
Total Flare <= I Hour
Total Flare> I Hour
Volume Flared 0
Measured Safety Pilot
Continuous Assist
TOTALFLARED
BP EXPLORATION ALASKA, INC,
CONSERVATION ORDER NO. 219
PRUDHOE BAY, WEST BEACH
LISBURNE PRODUCTION CENTER
GAS FLARING INCIDENTS
Aug -16
VOLUME PLANNED
DATE TIME )MSCF) DESCRIPTION OF INCIDENTS & CAUSE UNPLANNED ACTION TAKEN TO ELIMINATE CAUSE
Total Flare <_ 1 Hour 0
Total Flare> 1 Hour
Volume Flared 0
Measured Safety Pilot
Continuous Assist
TOTALFLARED
Link, Liz M (DOA)
From: AKOpsProdEOCTL <AKOPSPCCEOCTL@bp.com>
Sent: Friday, September 02, 2016 2:30 PM
To: 'aogcc.reporting@alaska.gov'
Cc: Loepp, Victoria T (DOA); Benson, Gary A; Arthur, Gregory; Schinagl, Werner; Fortenberry,
Christopher; AK, HSSEE Env Adv East; AK, OPS GPMA Facility OTL; Glover, Robin;
Buckbee, Rachel A; AK, OPS GPMA OSM; Bessler, Mark
Subject: Flaring Event at LPC
To: AOGCC Reporting CC: Victoria Loepp, AOGCC
aogcc.reporting()alaska.gov
From: Jennifer Blake, GPB Production Optimization Team Leader
A flaring event occurred at LPC starting at 08/29/2016 21:13 and continuing through 08/29/2016 23:59 with a volume of
295 (MSCF). The event lasted for 166 minutes and was due to depressurizing the LPC plant and commonlines for
planned maintenance. The event continued through the next day, 8/30/2016.
A flaring event occurred at LPC, continuing from the previous day, starting at 08/30/2016 00:01 and continuing through
08/30/2016 23:59 with a volume of 7958 (MSCF). The event lasted for 1438 minutes and was due to depressurizing the
LPC plant and commonlines for planned maintenance. The event continued through the next day, 8/31/2016.
A flaring event occurred at LPC, continuing from the previous day, starting at 08/31/2016 00:00 and stopping at
08/31/2016 23:59 with a volume of 3877 (MSCF). The event lasted for 1439 minutes and was due to depressurizing the
LPC plant for planned maintenance. The event stopped when the plant and commonlines were depressurized.
Thanks,
Jennifer Blake
EOC Production Optimization Team Lead
Office (907) 564-5926
Cell (907) 830-6204
Jennifer.blake(@bp.com
September 13, 2016
RECEIVED by
SEP 14 2016
AOGCC 0
BE Exploration (Alaska) Inc.
PO Box 196612
900 East Benson Boulevard
Anchorage, Alaska 995198612
Recipients of the Lisburne Production Center Gas Disposition Report:
Enclosed is the August 2016 LPC Facility Gas Disposition Report (AOGCC
Form 10-422).
Please call Anne Fiedler at (907) 564-5826 it you have any questions.
Sincerely,
Ow 01
Diane Colley
Manager, Production Taxes and Royalties Alaska
Enclosures
STATE OF ALASKA
ALASKA OIL AND GAS CONSERVATION COMMISSION
FACILITY REPORT OF PRODUCED GAS DISPOSITION
1. Facility Number
0290000009
2. Facility Name
PBU LISBURNE PROD (GPIMA)
3. Field
PBU - GPMA
4. Operator
BP
5. MonthNear of Disposition
I Se tember-2016
Disposition
Volume MCF
20. For production from multiple pools, list contribution of each pool as a percent of
Total Volume,
6. Sold
2,164
Pool Name Pool Code Percent
7. Reinjected
3,160,839
Sadlerochit 640150 0.8%
North Prudhoe Bay State 640152 0.0%
8. Flared or vented 1 hour or less
1,124
Point McIntyre 640180 37.0%
Lisburne 640144 59.3%
9. Flared or vented more than 1 hour (see instr.)
408
Ivishak-SagRiver test In 640147 1.1%
Niakuk 640148 1.9%
10. Pilot and Purge
10,936
West Beach 640186 0.0%
11. Assist Gas
96,690
12. Fuel gas used in lease operations.
238,988
13. Other (see instructions)
170,819
Official Use Only
Authorization>1 hr:
Safety
� r2
Cl
MCF
i 17,,5T -
2'�
14. TOTAL VOLUME (ITEMS 6-12)
3,681,968
Lease
Lease Use
MCFF
15. NGL Gas Equivalent
2,164
Conservation
MCF
16. Purchased gas
0
Waste:
MCF
17. Transferred from:
322,726
Commissioner Date
18. Transferred to: (Express as a negative #)
0
19. Remarks: Block 13: Lift Gas Off Field; Block 17: MI from Prudhoe = 275,715 and Fuel Gas from Prudhoe = 47,011
1 hereby certify that the foregoing is true and correct to the best of my knowledge.
Note: All volumes must be corrected
Signature Title Manager Production Taxes and Royalties Alaska to pressure of 14.65 psis and to a
J/ temperature of 60o F. Authority 20
Printed Name Diane ColleyPhone (907) 564-5775 Date / F //® AAC25.235.
Form 10-422 Rev. M009 INSTRUCTIONS ON REVERSE SIDE Submit in Duplicate
BP EXPLORATION ALASKA, INC,
CONSERVATION ORDER NO. 219
PRUDHOE BAY, LISBURNE
LISBURNE PRODUCTION CENTER
GAS FLARING INCIDENTS
Sep -16
9/20/2016 08:46-08:47 1
9/21/2016 13:39- 13:40 8
9/30/2016 09:39-09:53 628
Total Flom <= I Hour 695
9/21/2016 21:36 - 23:02 277
Total Flare> 1 Hour 277
Volume Flared 972
Measured Safety Pilot 7,139
Continuous Assist 57,455
TOTAL FLARED 65,566
Lowered the Set Point on 1801 to speed the turbine up and
1801 high suction pressure
U lower the suction pressure
VOLUME
U Water wash complete
PLANNED
DATE
TIME
(MSCF(
DESCRIPTION OF INCIDENTS & CAUSE
UNPLANNED ACTION TAKEN TO ELIMINATE CAUSE
9/1/2016
00:20-00:25
31
Depressured plant and common lines
P
Depressured plant and common lines
9/4/2016
07:58 -08:00
19
Depressured 24" common line
P
Flare valve closed
Relieve 5.5 lbs pressure between double block and bleed at
West Dock in preparation for rolling the blind from PM2 to LPC
9/10/2016
10:04-10:19
1
for STP 36.
U
Pressure relieved
9/19/2016
20:25 - 23:37
7
Plant start up (6 one minute events)
U
Start plant
9/20/2016 08:46-08:47 1
9/21/2016 13:39- 13:40 8
9/30/2016 09:39-09:53 628
Total Flom <= I Hour 695
9/21/2016 21:36 - 23:02 277
Total Flare> 1 Hour 277
Volume Flared 972
Measured Safety Pilot 7,139
Continuous Assist 57,455
TOTAL FLARED 65,566
Lowered the Set Point on 1801 to speed the turbine up and
1801 high suction pressure
U lower the suction pressure
Water wash
U Water wash complete
1808 reinjection compressor shut down by push button after
operator found leak coming from a nipple on the fuel gas
STOP push button was pushed, so this was a controlled shut
system.
U down
1807 shut down on low overhead seal oil tank level U Repaired seal oil level controls and restarted 1807
BP EXPLORATION ALASKA, INC,
CONSERVATION ORDER NO. 219
PRUDHOE BAY, POINT MCINTYRE
LISBURNE PRODUCTION CENTER
GAS FLARING INCIDENTS
Sep -I6
Total Flare c=1 Hour 359
9/21/2016 21:36-23:02 122
Total Flare> 1 Hour 122
Volume Flared 481
Measured Safety Pilot 3,317
Continuous Assist 35,621
TOTALFLARED 39,419
1807 shut down on low overhead seal oil tank level U Repaired seal oil level controls and restarted 1807
VOLUME
PLANNED
DATE
TIME
(MSCF)
DESCRIPTION OF INCIDENTS & CAUSE
UNPLANNED ACTION TAKEN TO ELIMINATE CAUSE
9/1/2016
00:20- 00:25
12
Depressured plant and common lines
P
Depressured plant and common lines
9/4/2016
07:58 -08:00
8
Depressured 24" common line
P
Flare valve closed
Relieve 5.5 Has pressure between double block and bleed at
West Dock in preparation for rolling the blind from PM2 to LPC
9/10/2016
10:04-10:19
0
for STP 36.
U
Pressure relieved
9/19/2016
20:25 - 23:37
3
Plant start up (6 one minute events)
U
Start plant
Lowered the Set Point on 1801 to speed the turbine up and
9/20/2016
08:46-08:47
0
1803 high suction pressure
U
lower the suction pressure
9/21/2016
13:39-13:40
4
Water wash
U
Water wash complete
STOP push button was pushed, so this was a controlled shut
9/30/2016
09:39-09:53
332
1808 reinjection compressor shut down by push button after op
U
down
Total Flare c=1 Hour 359
9/21/2016 21:36-23:02 122
Total Flare> 1 Hour 122
Volume Flared 481
Measured Safety Pilot 3,317
Continuous Assist 35,621
TOTALFLARED 39,419
1807 shut down on low overhead seal oil tank level U Repaired seal oil level controls and restarted 1807
BP EXPLORATION ALASKA, INC,
CONSERVATION ORDER NO. 219
PRUDHOE BAY, COM81NED NIAKUK
LISBURNE PRODUCTION CENTER
GAS FLARING INCIDENTS
Sep -16
9/30/2016 09:39 - 09:53 28
Total Flare <.1 Hour 30
Total Flare> 1 Hour 0
Volume Flared 30
Measured Safety Pilot
281
VOLUME
1,881
PLANNED
DATE
TIME
(Mscf)
DESCRIPTION OF INCIDENTS & CAUSE
UNPLANNED ACTION TAKEN TO ELIMINATE CAUSE
9/1/2016
00:20-00:25
1
Depressured plant and common lines
P Depressured plant and common lines
9/4/2016
07:58- DB:D0
1
Depressured 24" common line
P Flare valve closed
9/30/2016 09:39 - 09:53 28
Total Flare <.1 Hour 30
Total Flare> 1 Hour 0
Volume Flared 30
Measured Safety Pilot
281
Continuous Assist
1,881
TOTAL FLARED
2,192
1808 reinjection compressor shut down by push button after
operator found leak coming from a nipple on the fuel gas STOP push button was pushed, so this was a controlled shut
system. U down
1807 shut down on low overhead seal oil tank level U Repaired seal oil level controls and restarted 1807
BP EXPLORATION ALASKA, INC,
CONSERVATION ORDER NO. 219
PRUDHOE BAY, RAVEN
LISBURNE PRODUCTION CENTER
GAS FLARING INCIDENTS
Sep -16
9/30/2016 09:39-09:53 16
Total Flare 4=1 Hour 18
1808 reinjection compressor shut down by push button after op
9/21/2016 21:36- 23:02 9 1807 shut down on low overhead seal oil tank level
Total Flare> I Hour
9
VOLUME
27
PLANNED
DATE
TIME
(Mscf)
DESCRIPTION OF INCIDENTS & CAUSE
UNPLANNED ACTION TAKEN TO ELIMINATE CAUSE
9/1/2016
00:20-00:25
1
Depressured plant and common lines
P Depressured plant and common lines
9/4/2016
07:58-08:00
1
Depressured 24" common line
P Flare valve closed
9/30/2016 09:39-09:53 16
Total Flare 4=1 Hour 18
1808 reinjection compressor shut down by push button after op
9/21/2016 21:36- 23:02 9 1807 shut down on low overhead seal oil tank level
Total Flare> I Hour
9
Volume Flared
27
Measured Safety Pilot
172
Continuous Assist
1,040
TOTAL FLARED
1,239
U STOP push button was pushed, so this was a controlled shut dov
U Repaired seal oil level controls and restarted 1807
VOLUME
DATE TIME
9/30/2016 09:39-09:53 22
Total Flare <= I Hour
22
Total Flare> I Hour 0
Volume Flared 22
Measured Safety Pilot 27
Continuous Assist 693
TOTALFLARED 742
BP EXPLORATION ALASKA, INC,
CONSERVATION ORDER NO. 219
PRUDHOE BAY, PRUDHOE
LISBURNE PRODUCTION CENTER
GAS FLARING INCIDENTS
Sep -16
INCIDENTS & CAUSE
1808 reinjection compressor shut down by push button after
operator found leak coming from a nipple on the fuel gas
system.
PLANNED
UNPLANNED ACTION TAKEN TO ELIMINATE CAUSE
STOP push button was pushed, so this was a controlled shut
U down
SP EXPLORATION ALASKA, INC,
CONSERVATION ORDER NO. 219
PRUDHOE BAY, NORTH PRUDHOE BAY
LISBURNE PRODUCTION CENTER
GAS FLARING INCIDENTS
Sep -16
VOLUME PLANNED
DATE TIME (MSCF) DESCRIPTION OF INCIDENTS & CAUSE UNPLANNED ACTION TAKEN TO ELIMINATE CAUSE
Total Flare.I Hour 0
Total Flare > 1 Hour
Volume Flared 0
Measured Safety Pilot
Continuous Assist
TOTALFLARED 0
BP EXPLORATION ALASKA, INC,
CONSERVATION ORDER NO. 219
PRUDHOE BAY, WEST BEACH
LISBURNE PRODUCTION CENTER
GAS FLARING INCIDENTS
Sep -16
VOLUME
PLANNED
DATE TIME (MSCF( DESCRIPTION OF INCIDENTS & CAUSE UNPLANNED ACTION TAKEN TO ELIMINATE CAUSE
Total Flare <= I Hour 0
Total Flare > I Hour
Volume Flared 0
Measured Safety Pilot
Continuous Assist
TOTALFLARED 0
by
October 13, 2016
BP Exploration (Alaska)Inc.
PO Box 196612
900 East Benson Boulevard
Anchorage, Alaska 99519-6612
Recipients of the Lisburne Production Center Gas Disposition Report:
Enclosed is the September 2016 LPC Facility Gas Disposition Report (AOGCC
Form 10-422).
Please call Anne Fiedler at (907) 564-5826 if you have any questions.
Sincerely,
Diane Colley
Manager, Production Taxes and Royalties Alaska
Enclosures
Link, Liz M (DOA)
From: AKOpsProcIEOCTL <AKOPSPCCEOCTL@bp.com>
Sent: Thursday, September 22, 2016 10:24 AM
To: 'aogcc.reporting@alaska.gov'
Cc: Loepp, Victoria T (DOA); Benson, Gary A; Arthur, Gregory; Schinagl, Werner; Fortenberry,
Christopher; AK, HSSEE Env Adv East; AK, OPS GPMA Facility OTL; Glover, Robin;
Buckbee, Rachel A; AK, OPS GPMA OSM; Bessler, Mark
Subject: Flaring Event at LPC
To: AOGCC Reporting CC: Victoria Loepp, AOGCC
aoqcc.reportinq(@alaska.gov
From: Jennifer Blake, GPB Production Optimization Team Leader
A flaring event occurred at LPC starting at 09/21/2016 21:36 and stopping at 09/21/2016 23:02 with a volume of 408
(MSCF). The event lasted for 86 minutes and was due to compressor 1807 shutdown due from low overhead seal oil tank
level. The event stopped when the seal oil level controls were repaired and 1807 was restarted.
Thanks,
Jennifer Blake
EOC Production Optimization Team Lead
Office (907) 564-5926
Cell (907) 830-6204
Jennifer.blake@bp.com
STATE OF ALASKA
ALASKA OIL AND GAS CONSERVATION COMMISSION
FACILITY REPORT OF PRODUCED GAS DISPOSITION
1. Facility Number
0290000009
2. Facility Name
PBU LISBURNE PROD GPMA
3. Field
PBU - GPMA
4. Operator
BP
5. Monthlyear of Disposition
October -2016
Disposition
Volume MCF
20. For production from multiple pools, list contribution of each pool as a percent of
Total Volume.
6. Sold
103,809
Pool Name Pool Code Percent
7. Reinjected
9,630,230
Sadlerochit 640150 1.4%
North Prudhoe Bay State 640152 0.0%
8. Flared or vented 1 hour or less
230
Point McIntyre 640180 38.3%
Lisburne 640144 57.0%1
9. Flared or vented more than 1 hour (see instr.)
0
Ivishak-SagRiver test in 640147 1.2%
Niakuk 640148 2.2%
10. Pilot and Purge
11,454
West Beach 640186 0.0%
11. Assist Gas
121,436
12. Fuel gas used in lease operations.
828,697
13. Other (see instructions)
1,407,409
Official Use Only
Authorization>1 hr:
Safety
MCF
14. TOTAL VOLUME (ITEMS 6-12)
12,103,265
Lease Use
MCF
15. NGL Gas Equivalent
103,809
Conservation
MCF
16. Purchased gas
0
Waste:
MCF
17. Transferred from:
927,456
Commissioner Date
18. Transferred to: (Express as a negative #)
0
19. Remarks: Block 13: Lift Gas Off Field; Block 17: Ml from Prudhoe = 927,456 and Fuel Gas from Prudhoe = 0
1 hereby certify that}pe
/7
Signature i✓�
foregoing is true and correct to the best of my knowledge.
O
Title Mana er Production Taxes an Ro allies Alaska
Note: All volumes must be corrected
to ressure of 14.65 Sia and to a
temperature of 60o F. Authority 20
AAC25.235.
p
Printed Name Diane Colley Phone (907) 564-5775 Date t
Form 10-422 Rev. 5/2009 INSTRUCTIONS ON REVERSE SIDE Submit in Duplicate
BP EXPLORATION ALASKA, INC,
CONSERVATION ORDER NO. 219
PRUDHOE BAY, LISBURNE
LISBURNE PRODUCTION CENTER
GAS FLARING INCIDENTS
Oct -16
Total Flare c= 1 Hour 142
Total Flare > 1 Hour
VOLUME
Volume Flared
PLANNED
Measured Safety Pilot
DATE
TIME (MSCF)
DESCRIPTION OF INCIDENTS & CAUSE
UNPLANNED
ACTION TAKEN TO ELIMINATE CAUSE
10/2/216
20:51 - 21:05 56
1808 shut down due to failure to light off
U
Restarted
1801 shut down due to high oil temp, restarted and shut down
10/31/2016
10:37 - 11:03 86
on low suction
U
Restarted
Total Flare c= 1 Hour 142
Total Flare > 1 Hour
0
Volume Flared
142
Measured Safety Pilot
6,545
Continuous Assist
69,435
TOTALFLARED
76,122
BP EXPLORATION ALASKA, INC,
CONSERVATION ORDER NO. 219
PRUDHOE BAY, POINT MCINTYRE
LISBURNE PRODUCTION CENTER
GAS FLARING INCIDENTS
Ott -16
DATE
VOLUME
TIME (MSCF)
DESCRIPTION OF INCIDENTS & CAUSE
10/2/216
20:51 - 21:05 14
1808 shut down due to failure to light off
1801 shut down due to high oil temp, restarted and shut
10/31/2016
10:37 - 11:03 60
down on low suction
Total Flare <= 1 Hour 74
Total Flare > 1 Hour 0
Volume Flared 74
Measured Safety Pilot 4,359
Continuous Assist 46,169
TOTAL FLARED 50,602
PLANNED
UNPLANNED ACTION TAKEN TO ELIMINATE CAUSE
U Restarted
U Restarted
BP EXPLORATION ALASKA, INC,
CONSERVATION ORDER NO. 219
PRUDHOE BAY, COMBINED NIAKUK
LISBURNE PRODUCTION CENTER
GAS FLARING INCIDENTS
Oct -16
VOLUME
DATE TIME (Mscf) DESCRIPTION OF INCIDENTS & CAUSE
PLANNED
UNPLANNED ACTION TAKEN TO ELIMINATE CAUSE
10/2/216 20:51 - 21:05 3 1808 shut down due to failure to light off U Restarted
1801 shut down due to high oil temp, restarted and shut
10/31/2016 10:37 - 11:03 3 down on low suction U Restarted
Total Flare <= 1 Hour 6
Total Flare > 1 Hour
0
Volume Flared
6
Measured Safety Pilot
253
Continuous Assist
2,604
TOTAL FLARED
2,943
BP EXPLORATION ALASKA, INC,
CONSERVATION ORDER NO. 219
PRUDHOE BAY, RAVEN
LISBURNE PRODUCTION CENTER
GAS FLARING INCIDENTS
Oct -16
Total Flare <= 1 Hour 4
Total Flare> 1 Hour
VOLUME
Volume Flared
PLANNED
Measured Safety Pilot
DATE
TIME (Mscf)
DESCRIPTION OF INCIDENTS & CAUSE
UNPLANNED
ACTION TAKEN TO ELIMINATE CAUSE
10/2/216
20:51 - 21:05 2
1808 shut down due to failure to light off
U
Restarted
1801 shut down due to high oil temp, restarted and shut
10/31/2016
10:37 - 11:03 2
down on low suction
U
Restarted
Total Flare <= 1 Hour 4
Total Flare> 1 Hour
0
Volume Flared
4
Measured Safety Pilot
135
Continuous Assist
1,436
TOTAL FLARED
1,575
BP EXPLORATION ALASKA, INC,
CONSERVATION ORDER NO. 219
PRUDHOE BAY, PRUDHOE
LISBURNE PRODUCTION CENTER
GAS FLARING INCIDENTS
Oct -16
Total Flare <= 1 Hour 4
Total Flare> 1 Hour
VOLUME
Volume Flared
PLANNED
Measured Safety Pilot
DATE
TIME (Mscf)
DESCRIPTION OF INCIDENTS & CAUSE
UNPLANNED
ACTION TAKEN TO ELIMINATE CAUSE
10/2/216
20:51 - 21:05 2
1808 shut down due to failure to light off
U
Restarted
1801 shut down due to high oil temp, restarted and shut down
10/31/2016
10:37 - 11:03 2
on low suction
U
Restarted
Total Flare <= 1 Hour 4
Total Flare> 1 Hour
0
Volume Flared
4
Measured Safety Pilot
162
Continuous Assist
1,712
TOTALFLARED
1,878
BP EXPLORATION ALASKA, INC,
CONSERVATION ORDER NO. 219
PRUDHOE BAY, NORTH PRUDHOE BAY
LISBURNE PRODUCTION CENTER
GAS FLARING INCIDENTS
Oct -16
VOLUME PLANNED
DATE TIME (MSCF) DESCRIPTION OF INCIDENTS & CAUSE UNPLANNED ACTION TAKEN TO ELIMINATE CAUSE
Total Flare <= 1 Hour
Total Fiore > 1 Hour
Volume Flared
Measured Safety Pilot
Continuous Assist
TOTALFLARED
BP EXPLORATION ALASKA, INC,
CONSERVATION ORDER NO. 219
PRUDHOE BAY, WEST BEACH
LISBURNE PRODUCTION CENTER
GAS FLARING INCIDENTS
Oct -16
VOLUME PLANNED
DATE TIME (MSCF) DESCRIPTION OF INCIDENTS & CAUSE UNPLANNED ACTION TAKEN TO ELIMINATE CAUSE
Total Fiore <=1 Hour
Total Flare > 1 Hour
Volume Flared 0
Measured Safety Pilot
Continuous Assist
TOTALFLARED
STATE OF ALASKA
ALASKA OIL AND GAS CONSERVATION COMMISSION
FACILITY REPORT OF PRODUCED GAS DISPOSITION
1. Facility Number
0290000009
2. Facility Name
PBU LISBURNE PROD GPMA
3. Field
PBU - GPMA
4. Operator
BP
5. MonthNear of Disposition
November -2016
Disposition
Volume MCF
20. Forproduction from multiple pools,
list contribution of each pool as a percent of
Total Volume.
6.
Sold
109,296
Pool Name
Pool Code Percent
7.
Reinjected
9,906,326
Sadlerochit
640150 0.2%
North Prudhoe Bay State
640152 0.0%
8.
Flared or vented 1 hour or less
5,168
Point McIntyre
640180 33.6%
Lisburne
640144 63.6%
9.
Flared or vented more than 1 hour (see instr.)
0
Ivishak-SagRiver test in
640147 0.7%
Niakuk
640148 1.9%
10.
Pilot and Purge
11,050
West Beach
640186 0.0%
11.
Assist Gas
117,423
12. Fuel gas used in lease operations.
863,384
13.
Other (see instructions)
1,624,803
Official Use Only
Authorization >1 hr:
Safety
MCF
14. TOTAL VOLUME (ITEMS 6.12)
12,637,450
Lease Use
MCF
15. NGL Gas Equivalent
109,296
Conservation
MCF
16.
Purchased gas
0
Waste:
MCF
17.
Transferred from:
905,452
1
Commissioner
Date
18.
Transferred to: (Express as a negative #)
0
19.
Remarks: Block 13: Lift Gas Off Field; Block 17: MI from Prudhoe = 905,452 and Fuel Gas from Prudhoe = 0
Pt McIntyre NGLs at CGF (gas equivalent) = 6808 mcf
I hereby certify that the foregoing is true and correct to the best of my knowledge.
Signature Qate0v
Printed Name Diane Colley
Title Manager Production Taxes and Royalties Alaska
Phone (907) 564-5775 Date
Note: All volumes must be corrected
to pressure of 14.65 psis and to a
temperature of 60o F. Authority 20
AAC25.235.
Form 10-422 Rev. 512009 INSTRUCTIONS ON REVERSE SIDE Submit in Duplicate
DECEIVED by
DEC 15 2016
,A®GCC 0
BP Exploration (Alaska)Inc.
PO Box 196612
900 East Benson Boulevard
December 14, 2016 Anchorage, Alaska 9951M612
Recipients of the Lisburne Production Center Gas Disposition Report:
Enclosed is the November 2016 LPC Facility Gas Disposition Report (AOGCC
Form 10-422).
Please call Anne Fiedler at (907) 564-5826 if you have any questions.
Sincerely,
�tCUlcu A
Diane Colley
Manager, Production Taxes and Royalties Alaska
Enclosures
BP EXPLORATION ALASKA, INC,
CONSERVATION ORDER NO. 219
PRUDHOE BAY, LISBURNE
LISBURNE PRODUCTION CENTER
GAS FLARING INCIDENTS
Nov -16
VOLUME PLANNED
DATE TIME (MSCF) DESCRIPTION OF INCIDENTS 9, CAUSE UNPLANNED ACTION TAKEN TO ELIMINATE CAUSE
11/17/2016 09:54-09:55
11/21/2016 16:02 - 16:59 3,400
Total Flare <=1 Hour 3,401
Total Flare> 1 Hour
0
Volume Flared
3,401
Measured Safety Pilot
7,016
Continuous Assist
74,540
TOTAL FLARED
84,957
1855 shutdown on low lubricator level alarrm
1807 reinjection compressor shutdown because of
control/instrumentation failure associated with 43 horizontal turbine
Started 1855
Field production was cut to lower gas
production until 1807 T/C restarted
BP EXPLORATION ALASKA, INC,
:ONSERVATION ORDER NO. 219
PRUDHOE BAY, POINT MCINTYRE
LISBURNE PRODUCTION CENTER
GAS FLARING INCIDENTS
Nov -16
VOLUME PLANNED
DATE TIME (MSCF) DESCRIPTION OF INCIDENTS & CAUSE UNPLANNED ACTION TAKEN TO ELIMINATE CAUSE
11/17/2016 09:54-09:55 0
11/21/2016 16:02 - 16:59 1,621
Total Flare r 1 Hour 1,621
Total Flare > 1 Hour
0
Volume Flared
1,621
Measured Safety Pilot
3,723
Continuous Assist
39,572
TOTAL FLARED
44,916
1855 shutdown on low lubricator level alarrm
1607 reinjection compressor shutdown because of
control/instrumentation failure associated with R3 horizontal turbine
U Started 1855
Field production was cut to lower gas
U production until 1807 T/C restarted
BP EXPLORATION ALASKA, INC,
CONSERVATION ORDER NO. 219
PRUDHOE BAY, COMBINED NIAKUK
LISBURNE PRODUCTION CENTER
GAS FLARING INCIDENTS
Nov -16
VOLUME PLANNED
DATE TIME (Mscf) DESCRIPTION OF INCIDENTS & CAUSE UNPLANNED ACOON TAKEN TO ELIMINATE CAUSE
11/17/2016 09:54 - 09:55 0
11/21/2016 16:02-16:59 109
Total Flare <=1 Hour 109
Total Flare > 1 Hour 0
Volume Flared 109
Measured Safety Pilot 213
Continuous Assist 2,263
TOTAL FLARED 2,585
1855 shutdown on low lubricator level alarrm
1807 reinjection compressor shutdown because of
control/instrumentation failure associated with p3 horizontal turbine
U Started 1855
Field production was cut to lower gas
U production until 1807 T/C restarted
BP EXPLORATION ALASKA, INC,
:ONSERVATION ORDER NO. 219
PRUDHOE BAY, RAVEN
LISBURNE PRODUCTION CENTER
GAS FLARING INCIDENTS
Nov -16
VOLUME PLANNED
DATE TIME (Mscf) DESCRIPTION OF INCIDENTS & CAUSE UNPLANNED ACTION TAKEN TO ELIMINATE CAUSE
11/17/2016 09:54 - 09:55 0
11/21/2016 16:02 - 16:59 29
Total Flare <=1 Hour 29
Total Flare > 1 Hour
0
Volume Flared
29
Measured Safety Pilot
78
Continuous Assist
836
TOTALFLARED
943
1855 shutdown on low lubricator level alarrm
1807 reinjection compressor shutdown because of
control/instrumentation failure associated with a3 horizontal turbine
U Started 1855
Field production was cut to lower gas
U production until 1807 T/C restarted
BP EXPLORATION ALASKA, INC,
CONSERVATION ORDER NO. 219
PRUDHOE BAY, PRUDHOE
LISBURNE PRODUCTION CENTER
GAS FLARING INCIDENTS
Nov -I6
VOLUME PLANNED
DATE TIME (MScf) DESCRIPTION OF INCIDENTS & CAUSE UNPLANNED ACTION TAKEN TO ELIMINATE CAUSE
11/17/2016 09:54-09:55 0
11/21/2016 16:02-16:59 8
Total Flare <= I Hour 8
Total Flare > 1 Hour
0
Volume Flared
8
Measured Safety Pilot
20
Continuous Assist
212
TOTALFLARED
240
1855 shutdown On low lubricator level alarrm
1807 reinjection compressor shutdown because of
control/instrumentation failure associated with k3 horizontal turbine
U Started 1855
Field production was cut to lower gas
U production until 1807 T/C restarted
BP EXPLORATION ALASKA, INC,
:ONSERVATION ORDER NO. 219
PRUDHOE BAY, NORTH PRUDHOE BAY
LISBURNE PRODUCTION CENTER
GAS FLARING INCIDENTS
Nov -36
VOLUME PLANNED
DATE TIME )MSCF) DESCRIPTION OF INCIDENTS & CAUSE UNPLANNED ACTION TAKEN TO ELIMINATE CAUSE
Total Flare <=1 Hour 0
Total Flom> 1 Hour
Volume Flared D
Measured Safety Pilot
Continuous Assist
TOTALFLARED
BP EXPLORATION ALASKA, INC,
CONSERVATION ORDER NO. 219
PRUDHOE BAY, WEST BEACH
LISBURNE PRODUCTION CENTER
GAS FLARING INCIDENTS
Nov -16
VOLUME PLANNED
DATE TIME (MSCF) DESCRIPTION OF INCIDENTS & CAUSE UNPLANNED ACTION TAKEN TO ELIMINATE CAUSE
Total Flare <=1 Hour 0
Total Flare > 1 Hour
Volume Flared 0
Measured Safety Pilot 0
Continuous Assist 0
TOTALFLARED
STATE OF ALASKA
ALASKA OIL AND GAS CONSERVATION COMMISSION
FACILITY REPORT OF PRODUCED GAS DISPOSITION
1. Facility Number
0290000009
2. Facility Name
PBU LISBURNE PROD GPMA
3. Field
PBU - GPMA
4. Operator
BP
5. Mont hNear of Disposition
December -2016
Disposition
Volume MCF
20. Forproduction from multiple pools, list contribution of each pool as a percent of
Total Volume.
6. Sold
117,294
Pool Name PoolCode Percent
7. Reinjected
9,933,147
Sadlerochit 640150 0.6%
North Prudhoe Bay State 640152 0.0%
8. Flared or vented 1 hour or less
75
Point McIntyre 640180 27.6%
Lisbume 640144 68.9%
9. Flared or vented more than 1 hour (see instr.)
4,114
Ivishak-SagRiver test in 640147 1.0%
Niakuk 640148 1.9%
10. Pilot and Purge
11,501
West Beach 640186 0.0%
11. Assist Gas
121,524
12. Fuel gas used in lease operations.
898,171
13. Other (see instructions)
1,423,996
Official Use Only
Authorization >1 hr:
rLeU=se�
MCF
T-L14.
TOTAL VOLUME (ITEMS 6-12)
12,509,82215.
NGL Gas Equivalent
117,294
rvation
MCF
16. Purchased gas
0
Waste:
MCF
17. Transferred from:
1,052,001
3-
Commissioner Date
18. Transferred to: (Express as a negative #)
0
19. Remarks: Block 13: Lift Gas Off Field; Block 17: MI from Prudhoe = 1,052,001 and Fuel Gas from Prudhoe = 0
Pt McIntyre NGLs at CGF (gas equivalent) = 9187 mcf
I hereby certify that th INforegping is true and correct to the best of my knowledge.
Note: All volumes must be corrected
Signature _ [[.��11 + x ,/' Title Manacier Production Taxes and Royalties Alaska to pressure of 14.65 psis and to a
temperature of 60o F. Authority 20
Printed Name Diane Colley Phone (907) 564-5775 Date / I , / AAC25.235.
Form 10-422 Rev. 5/2009 INSTRUCTIONS ON REVERSE SIDE Submit in Duplicate
BP EXPLORATION ALASKA, INC,
CONSERVATION ORDER NO. 219
PRUDHOE BAY, LISBURNE
LISBURNE PRODUCTION CENTER
GAS FLARING INCIDENTS
Dec -16
VOLUME
DATE TIME (MSCF) DESCRIPTION OF INCIDENTS & CAUSE
12/31/2016 08:10 - 08:11 57 Failed start on 1807, no ignition in the combustion cans.
Total Flare <=1 Hour 57
1807 reinjection compressor shutdown because of
control/instrumentation failure associated with second state
nozzle clevis. Initial 76 minute event (3635 mcf) followed by 4
12/30/2016 05:56 - 07:12 3,063 very short events (10 min, 479 mcf) over next 12 hours.
Total Flare> 1 Hour
3,063
Volume Flared
3,120
Measured Safety Pilot
7,967
Continuous Assist
84,197
TOTALFLARED
95,284
PLANNED
UNPLANNED ACTION TAKEN TO ELIMINATE CAUSE
U 1807 de -pressure completed
U Flare valve closed
BP EXPLORATION ALASKA, INC,
CONSERVATION ORDER NO. 219
PRUDHOE BAY, POINT MCINTYRE
LISBURNE PRODUCTION CENTER
GAS FLARING INCIDENTS
Dec -16
VOLUME PLANNED
DATE TIME (MSCF) DESCRIPTION OF INCIDENTS & CAUSE UNPLANNED ACTION TAKEN TO ELIMINATE CAUSE
12/31/2016 08:10 - 08:11 13 Failed start on 1807, no ignition in the combustion cans. U 1807 de -pressure completed
Total Flare <=1 Hour 13
1807 reinjection compressor shutdown because of
control/instrumentation failure associated with second state
nozzle clevis. Initial 76 minute event (3635 mcf) followed by
12/30/2016 05:56 - 07:12 704 4 very short events (10 min, 479 mcf) over next 12 hours. U Flare valve closed
Total Flare > 1 Hour 704
Volume Flared 717
Measured Safety Pilot
3,120
Continuous Assist
32,914
TOTALFLARED
36,751
BP EXPLORATION ALASKA, INC,
CONSERVATION ORDER NO. 219
PRUDHOE BAY, COMBINED NIAKUK
LISBURNE PRODUCTION CENTER
GAS FLARING INCIDENTS
Dec -16
Total Flare <=1 Hour 2
1807 reinjection compressor shutdown because of
control/instrumentation failure associated with second state
nozzle clevis. Initial 76 minute event (3635 mcf) followed by
12/30/2016 05:56 - 07:12 143 4 very short events (30 min, 479 mcf) over next 12 hours. U Flare valve closed
Total Flare> 1 Hour 143
Volume Flared 145
Measured Safety Pilot 225
Continuous Assist 2,381
TOTALELARED 2,751
VOLUME
PLANNED
DATE
TIME (Mscf)
DESCRIPTION OF INCIDENTS & CAUSE
UNPLANNED ACTION TAKEN TO ELIMINATE CAUSE
12/31/2016
08:10- 08:11 2
Failed start on 1807, no ignition in the combustion cans.
U 1807 de -pressure completed
Total Flare <=1 Hour 2
1807 reinjection compressor shutdown because of
control/instrumentation failure associated with second state
nozzle clevis. Initial 76 minute event (3635 mcf) followed by
12/30/2016 05:56 - 07:12 143 4 very short events (30 min, 479 mcf) over next 12 hours. U Flare valve closed
Total Flare> 1 Hour 143
Volume Flared 145
Measured Safety Pilot 225
Continuous Assist 2,381
TOTALELARED 2,751
BP EXPLORATION ALASKA, INC,
CONSERVATION ORDER NO. 219
PRUDHOE BAY, RAVEN
LISBURNE PRODUCTION CENTER
GAS FLARING INCIDENTS
Dec -16
VOLUME
DATE TIME (Mscf) DESCRIPTION OF INCIDENTS & CAUSE
12/31/2016 08:10-08:11 1 Failed start on 1807, no ignition in the combustion cans.
Total Flare <= 1 Hour 1
1807 reinjection compressor shutdown because of
control/instrumentation failure associated with second state
nozzle clevis. Initial 76 minute event (3635 mcf) followed by
12/30/2016 05:56-07:1: 84 4 very short events (10 min, 479 mcf) over next 12 hours.
Total Flare > 1 Hour 84
Volume Flared
85
Measured Safety Pilot
117
Continuous Assist
1,247
TOTALFLARED
1,449
PLANNED
UNPLANNED ACTION TAKEN TO ELIMINATE CAUSE
U 1807 de -pressure completed
U Flare valve closed
BP EXPLORATION ALASKA, INC,
CONSERVATION ORDER NO. 219
PRUDHOE BAY, PRUDHOE
LISBURNE PRODUCTION CENTER
GAS FLARING INCIDENTS
Dec -16
VOLUME PLANNED
DATE TIME (Mscf) DESCRIPTION OF INCIDENTS & CAUSE UNPLANNED ACTION TAKEN TO ELIMINATE CAUSE
12/31/2016 08:10 - 08:11 2 Failed start on 1807, no ignition in the combustion cans. U 1807 de -pressure completed
Total Flare r_ 1 Hour 2
1807 reinjection compressor shutdown because of
control/instrumentation failure associated with second state
nozzle clevis. Initial 76 minute event (3635 mci) followed by 4
12/30/2016 05:56 -07:12 120 very short events (10 min, 479 mcf) over next 12 hours. U Flare valve closed
Total Flare > 1 Hour 120
Volume Flared 122
Measured Safety Pilot 72
Continuous Assist 785
TOTAL FLARED 979
January 13, 2017
BP Exploration (Alaska) Inc.
PO Box 196612
900 East Benson Boulevard
Anchorage, Alaska 99519-6612
Recipients of the Lisburne Production Center Gas Disposition Report:
Enclosed is the December 2016 LPC Facility Gas Disposition Report (AOGCC
Form 10-422).
Please call Anne Fiedler at (907) 564-5826 if you have any questions.
Sincerely,
Diane ColleyIj
Manager, Production Taxes and Royalties Alaska
Enclosures
Link, Liz M (DOA)
From: AKOpsProcIEOCTL <AKOPSPCCEOCTL@bp.com>
Sent: Wednesday, January 04, 2017 12:28 PM
To: 'aogcc.reporting@alaska.gov'
Cc: Loepp, Victoria T (DOA); Benson, Gary A; Arthur, Gregory; Schinagl, Werner; Fortenberry,
Christopher; AK, HSSEE Env Adv East; AK, OPS GPMA Facility OTL; Glover, Robin;
Buckbee, Rachel A; AK, OPS GPMA OSM; Bessler, Mark
Subject: Flaring Event at LPC
To: AOGCC Reporting CC: Victoria Loepp, AOGCC
aoocc. reportino(c)alaska.gov
From: Jennifer Blake, GPB Production Optimization Team Leader
A flaring event occurred at LPC starting at 12/30/2016 05:56 and stopping at 12/30/2016 07:12 with a volume of 3635
(MSCF). The event lasted for 76 minutes and was due to 1807 reinjection compressor shutting down caused by a
control/instrumentation failure associated with the second stage nozzle clevis. The event stopped when the flare valve
reseated.
Thanks,
Jennifer Blake
EOC Production Optimization Team Lead
Office (907) 564-5926
Cell (907) 830-6204