HomeMy WebLinkAboutPoint Thomson - ExxonMobil Alaska Production Inc.State of Alaska AOGCC
Gas Disposition Files
Year: 2016
Facility: Point Thomson
Operator: ExxonMobil Alaska Production Inc.
STATE OF ALASKA
ALASKA OIL AND GAS CONSERVATION COMMISSION
FACILITY REPORT OF PRODUCED GAS DISPOSITION
1. Facility Number
"DDIX)Om
2. Faomly
Name
PTV
3. Fselo
Pairs TYnmm�
4. 0lrMM.r5. MaNNYm d Dhpmelan
EvorWN MMsa Pmauclbn lx AII1116
Dlelm.bfon
volurx MCF
W. Fd pOMdbn kam mwivvepads. lbtLmneMux dxm podxeperceN of idtl
Vdurm
6. sow
0
Pool Namo Pod COM Percent
]. Rell{Wea
101,081
Troson 04 RaW 100
a. Flans or vadcl t hour or sera
0
6. Flamer orverum mon eMn l hour (xe
ubV.l
747,534
W, Pootanl Puree
195
11, Assist Gas
0
12. Fuel on uvea In baso o"oulons.
31,573
13. other (.x Wro Oona)
0
Official u.f orAy
AWiWaMn,1 hr
/1�s2�
Sassyi J
MCF
14. TOTAL VOLDNf grlMe 84])
660,362
Leese use
MCF
15. NGL Gas Eeulvalxi
C raanaMn
MCF
16. Prvclbseo Bae
waste:
MCF
17. Tranalemo hom:
0
46
Commbsbner Dab
16. TrxdMNo b: (Esprxe as a neguv
ae
a
1e. Remark.: 0
0
Note: If flaring events greater than 1 hour, complete the information below:
0
I MbbY nnay 1e(oreedrge coned to tlb Cestdmy Nnovaea6e.
5lgm M .an
PNaeo Name Carat. Alvarez Phone M 62 .5770 Dab 5 ! /
Note: AN volumes must be correcfsd to
finswu a of 14.65psie and to a
fempetature of 600 F. Authodfy 20
AAC25.235.
V 7—L-
611 /1
GAS DISPOSITION IMP
ptDate
OpNo
FacilityNo
Date Flared
Start Time
Ending Time
End Date
Planned
MCIF
Description of Flaring Event
Action Taken to Minimize Volume
04101/2016
118575
0890000001
04/02/2016
21:40
23:59
04/30/2016
P
747,534
PTa—nn-e-Plaring associate
with the initial startup of PTU
facility, to achieve minimum
facility temperature and rate
requirements for reinjection.
Volume impacted by delays
encountered during
commissioning of the gas
injection compressor train.
NOTE: Flaring not
continuous, startup events
combined for renortono
Producing well rates reduced to
minimum when not required for
compressor operation or gas
reinjection. Pressure and
temperature maintained in the
facility during commissioning to
prevent additional flare volumes
from subsequent restarts.
Directions
Excel sheet and enter all flaring events over one hour for the month under the appropriate columns per instructions below. One operator can enter all events from all
R tDate
mm/01 /yyyy Use first day of the month.
Operator Names
Operator Numbers
O No
Six digits. See list of operators in next column.
AURORA GAS LLC
110800
FacilityNo
Ten digits. On form 10-422 or call (907) 793-1241.
BP EXPLORATION ALASKA
112300
Date Flared
mm/dd/yyyy
MARATHON OIL CO
129000
Start Time
Military time: 00:00 to 23:59
NORTH SLOPE BOROUGH
131300
Ending Time
Military time: 00:00 to 23:59
PACIFIC ENERGY RESOUR
131900
End Date
mm/dd/yyyy
CONOCOPHILLIPS ALASKA
134200
Planned
"U" for unplanned event or "P" for planned event.
PIONEER NATURAL RESOU
135300
MCF
IFlared gas amount in MCF. NO DECIMALS.
TECK COMINCO ALASKA IN141200
UNION OIL CO OF CALIFOR
145000
XTO ENERGY INC
146700
EXXONMOBIL ALASKA PROI
118575
Link, Liz M (DOA)
From: Loepp, Victoria T (DOA)
Sent: Thursday, May 19, 2016 9:40 AM
To: AOGCC Reporting (DOA sponsored)
Subject: RE: Flaring for Point Thomson for April 2016
Liz,
I don't recall giving them this direction however for this instance, we will accept the combined flaring for start-up. In the
future, events will need to be delineated with start and stop times and the specific dates.
Thanx for chasing this down,
Victoria
From: AOGCC Reporting (DOA sponsored)
Sent: Thursday, May 19, 2016 9:34 AM
To: Loepp, Victoria T (DOA)
Subject: Flaring for Point Thomson for April 2016
Hi Victoria,
Per email chain below and submitted flaring report, it appears the Production Engineer at Exxon received direction from
somebody at AOGCC regarding combining the reporting for start-up flaring events. I know we just discussed this, but in
light of Candice's response, is it permissible for start-up or would you prefer to see each event separated?
R tDate
O No
Facilit No
Date
Flared
Start
Time
Ending
Time
End Date
Planned
MCF
Desc
Planner
associ2
startup
achieve
temper
requires
reinject
impactE
04/01/2016
118575
0890000001
04/02/2016
21:40
23:59
04/30/2016
P
747,534
encoun
commiE
injectioi
train.
NOTE:
continu
events
reportir
Liz Link
Statistical Technician
Alaska Oil and Gas Conservation Commission (AOGCC)
907.793.1241
I iz.l ink(walaska. eov
STATE OF ALASKA
ALASKA OIL AND GAS CONSERVATION COMMISSION
FACILITY REPORT OF PRODUCED GAS DISPOSITION
1. Facility Number
890000001
2. Facility
Name
PTU
3. Field
Point Thomson
4. Operator
Mobil
EmonAlaska Production lnc.
5. Month/Year of Disposition
April 2016
Disposition
Volume MCF
20. For production from mlilhple pools, list contribution of each pool as a percent of Total
Volume.
6. Sold
0
Pool Name Pool Code Percent
7. Reinjected
101,080.60
B. Flared or vented 1 hour or less
0.00
9. Flared or vented more than 1 hour
(seeinstr.)
747,533.80
'
10. Pilot and Purge
194.80
11. Assist Gas
0
a. �.....
12. Fuel gas used in lease operations.
31,572.90
13. Other (see instructions)
0
#0 jOflicial Use Only
Authorization hr:
Safety14.
MCF
TOTAL VOLUME (ITEMS 6-13)
680,382.10
Lease Use
MCF
15, NGL Gas Equivalent
Conservation
MCF
16. Purchased gas
Waste:
MCF
17. Transferred from:
Commissioner Date
18. Transferred to: (Express as a
negative #)
19. Remarks: 0
0
Note: If flaring events greater than 1 hour, complete the information below:
0
0
I hereby certify th h foregoing is true rrect to the best of my knowledge.
Signature Ti Revenue Accountant
Printed Name Candice Alvarez a (832) 624-5770 Date 3/20/2016
Note: All volumes must be corrected to
pressure of 14.65 psia and to a
temperature of 60o F. Authority 20
AAC25.235.
STATE OF ALASKA
ALASKA OIL AND GAS CONSERVATION COMMISSION
FACILITY REPORT OF PRODUCED GAS DISPOSITION
1. Facility Number
890000001
2. Facility
Name
PTU
3. Field
Point Thomson
4. Operator 5. MonthNear of Disposition
ExxonMobil Alaska Production Inc. May 2016
Disposition
Volume MCF
20. For production from multiple pools, list contribution of each pool as a percent of Total
Volume.
6. Sold
0
Pool Name Pool Code Percent
7. Reinjected
0
Thomson Oil 668150 100
8. Flared or vented t hour or less
7,836
9. Flared or vented more than l hour
(see instr.)
93,996
10. Pilot and Purge
55
11. Assist Gas
0
12. Fuel gas used in lease operations.
8,006
13. Other (see instructions)
0
Official Use Only
Authorization 11 hr:
Safety
939q
MCF
14. TOTAL VOLUME (ITEMS 6-13)
109,893
Lease Use
MCF
15. NGL Gas Equivalent
Conservation
MCF
16. Purchased gas
Waste:
MCF
17. Transferred from:
;00 'U
L Commissioner Dale
18. Transferred to: (Express as a
negative #)
19. Remarks: 0
0
Note: If flaring events greater than 1 hour, complete the information below:
0
0
1 hereby certify Mt the foregoin, s h-4 and correct to the best of my knowledge.
Signalu Title Revenue Accountant
/ �
Printed Name Cantlice Alvarez Phone (832) 624-5770 Date lP
Note: All volumes must be corrected to
pressure of 14.65 psia and to a
temperature of 60o F. Authority 20
AAC25.235.
YT L --
711q
7/l8 I lb
GAS DISPOSITION IMPORT FORM FOR FLARING
EVENTS GREATER
THAN 1 HOUR
RptDate
OpNo
Facilit No
Date Flared
Start Time
Ending Time
End Date
Planned
MCF
Description of Flaring Event
Action Taken to Minimize Volume
Initial commissioning and
Commissioned FGC during Central
start-up of flash gas
Pad start-up (PTU -15) with intent of
5/1/2016
118575
0890000001
5/1/2016
04:17
18:47
5/1/2016
P
12,725
compressor (FGC) requiring
reducing FGC commissioning work
flowing wells and routing gas
and associated flaring during West
to flare
Pad start-up
Initial commissioning and
Commissioned FGC during Central
start-up of flash gas
Pad start-up (PTU -15) with intent of
5/1/2016
118575
0890000001
5/2/2016
03:28
15:39
5/2/2016
P
10,625
compressor (FGC) requiring
reducing FGC commissioning work
flowing wells and routing gas
and associated flaring during West
to flare
Pad start-up
Initial commissioning and
Commissioned FGC during Central
start-up of flash gas
Pad start-up (PTU -15) with intent of
5/1/2016
118575
0890000001
5/3/2016
1444
18:58
5/3/2016
P
1,541
compressor (FGC) requiring
reducing FGC commissioning work
flowing wells and routing gas
and associated flaring during West
to flare
Pad start-up
Initial commissioning and
Commissioned FGC during Central
start-up of flash gas
Pad start-up (PTU -15) with intent of
5/1/2016
118575
0890000001
5/4/2016
08:06
09:38
5/5/2016
P
18,360
compressor (FGC) requiring
reducing FGC commissioning work
flowing wells and routing gas
and associated flaring during West
to flare
Pad start-up
Initial unloading and clean
Constrained well rate and flow
5/1/2016
118575
0890000001
5/28/2016
12:05
22:45
5/28/2016
P
18,661
up of West Pad well PTU -17
duration during initial unloading and
to Central Pad facility
clean up period
Initial unloading and clean
Constrained well rate and flow
5/1/2016
118575
0890000001
5/29/2016
17:56
01:33
5/30/2016
P
11,935
up of West Pad well PTU -17
duration during initial unloading and
to Central Pad facility
clean up period
Production of West Pad well
Constrained well rate and flow
5/1/2016
118575
0890000001
5/30/2016
12:56
06:59
5/31/2016
P
20,149
PTU -17 for separator sample
duration during sampling period
collection
This Excel spreadsheet has column headings and data formatting to import flaring events over one hour
into the AOGCC database. Cop and paste the headings into an
Directions
R tDate
mm/01/yyy7Use first day of the month.
operator Names Operator Numbers
O No
Six digits. See list of operators in next column.
AURORA GAS LLC 110800
FacilityNo
Ten digits. On form 10-422 or call (907) 793-1241.
BP EXPLORATION ALAS 112300
Date Flared
mm/dd/yyyy
MARATHON OIL CO 129000
Start Time
Military time: 00:00 to 23:59
NORTH SLOPE BOROUGH 131300
STATE OF ALASKA
ALASKA OIL AND GAS CONSERVATION COMMISSION
FACILITY REPORT OF PRODUCED GAS DISPOSITION
1. Facility Number
890000001
2. Facility
Name
PTU
3. Field
Point Thomson
4. Operator 5. Month/Year of Disposition
ExxonMobil Alaska Production Inc. June 2016
Disposition
Volume MCF
20. For production from multiple pools, list contribution of each pod as a percent of Total
volume.
Sold
0
Pool Name Pool Code Percent
7. Reinjected
44,561
Thomson Oil 668150 100
B. Flared or vented 1 hour or less
17,836
9. Flared or vented more than 1 hour
(see instr.)
263,807
10. Pilot and Purge
181
11. Assist Gas
0
12. Fuel gas used in lease operations.
16,305
13. Other (see instructions)
0
Official Use Only
Authorization >1 hr
Safety v G�
MCF ✓T
14. TOTAL VOLUME (BEMs 6-13)
342,691
Lease Use
5411
15. NGL Gas Equivalent
Conservation
MCF
16. Purchased gas
Waste:
MCF
17. Transferred from:
-1—/
Commissioner Date
18. Transferred to: (Express as a
negative #)
19. Remarks: 0
0
Note: If flaring events greater than 1 hour, complete the information below:
0
0
1 hereby certifyh t the foregoing is correct to the best of my knowledge.
Note: All volumes must be corrected to
Signature ' e Revenue Accountant pressure of 14.65 psia and to a
temperature of 60o F. Authority 20
Printed Name Candice Alvarez ne (832) 624-5770 Date I AAC25.235.
GAS DISPOSITION IMPORT FORM FOR FLARING EVENTS GREATER THAN 1 HOUR
O No
Facilil No
Date Flared
Start Time
Endin Time
End Date
Planned
MCF Description of FlaringEvent Action Taken to Minimize Volume
Insist commissioning end start-up of flash gas compressor (FOCI requiring flowing we IN and Minimized well flow rate and FGC operating run time to limit flaring.
118575
0690000001
6/112016
09'13
10.38
6/V2016
P
398
routingas to flare.
Initial commissioning and start-up of flash gas compressor (FGC) requiring flowing wells and Minimized well flow rate and FGC operating run time to limit flaring.
118575
0890000001
6/12016
1611
18:24
6/12016
P
1.335
routin ss to flare.
Startup and commissioning of first gas injection compressor, trip on 5 of 8 separate runs within 1 Well remainetl online at low rate between compressor runs to
f61112016 118575
0890000001
6/32016
06:3]
1413
6/6/2016
P
159,706 minute. Last antl longest run approx. 23hrs on 6/5 to 6/6 with gas reinjection antl 1.5MMsdlh flare maintain necessary heat in the plant for each subsequent attemptFGC
not o ti durin this time). Limited full facilit restarts to minimize the overall volume flared.
Initial commissioning and start-up of flash gas compressor (FGC) requiring flowing wells and Minimized well flow rate and FGC operating run time to limit flaringrotin
118575
0890000001
6110/2016
12:04
17:3]
6/102016
P7,282
as to flare.Continuing
plannetl inspections of first compressor antl working to put
118575
0890000001
61112016
02:33
1550
6/112016
P
38,677 Initial commissioning and start-up of second gas injection compressorin extended service to minimize flaring volumes during commissioning
of second gas iri ction complies
Continuing planned inspections of first compressor and working to put
6/12016 118575
0890000001
61112016
18:12
2007
6/1112016
P
5,159 Initial commissioning and start-up of second gas injection compressorin extended service to minimae flaring volumes during commissioning
of secontl gas injection compressor,
Startup and commissioning of second gas injection compressor. Flowing well to flare to achieve Began the compressor run once minimum conditions were =braved
6112016 118575
0890000001
6/1512016
07:35
17:57
6/152016
P
26,800 minimum facility temperature and rete to commence compressor run after extended shutdown and shut in the well at completion of the compressor run.
Period.
Flow well to flare and packed export pipeline with condensate to assist downstream operator in Communicated with downstream operator to resolve the issue as
611/2016 1185]5
0890000001
61182016
1422
183]
6/182016
P
5,058
fmein2 stuck eieeline pig. quicklyas Possible and subsequently shut in wells ain.
Well remained online at low rate between compressor runs to
Startup and commissioning of second gas injection compressor; trip on 3 of 4 separate runs after 3-
maintain necessary heat in the plant for each subsequent attempt.
6/12016 118575
0890000001
62412016
14'3]
21:55
6242016
P
7,819 q minutes each. Shut down well between sets of runs on separate days,
Well remained online at low rate between compressor runs to
Startup and commissioning of first gas injection compressor, 4 separate runs of between 1 and 15
maintain necessary heat in the plant for each subsequent attempt.
6/1/2016 118575
08900MOOl
61252016
1242
20.12
612512016
P
6.077
minutes. Shut down well between sets of runs on separate days,
Minimized well flow rate and duration while collecting compressor
6112016 118575
0891X)l1
626/2016
10:44
1649
626/2016
P
5,496 Run and troubleshooting of gas injection compressor performance, performance data.
This Excels
reatlsheel
has column
headings and data formattin
to Import
flaring events over, one hour into the AOGCC database. Co and asle the headin s into an Excel sheet and enter all florin events over one hour for the month under theappropriate columns
R tDate mm/OtNYri Use asI bay of the month. O era[or Names O erator Numbers
O No Six digits. See list of operators in next column. AURORA GAS LLC 110800
Fadli No Ten tligits. On form 10-022 orcall (907) 793-1241. BP EXPLORATION ALASKA INC 112300
ate Flaremmldd/yyyy MARATHON OIL CO 128000
tart Time Military time: W W to 23:59 NORTH SLOPE BOROUGH 131300
ndin Tim Military time: 00:00 to 23: 59 PACIFIC ENERGY RESOURCES LTD 131900
End Date mMddtyyyy CONOCOPHILLIPS ALASKA INC 134200
Planned "U" for unplanned event or"P" for plannetl event. PIONEER NATURAL RESOURCES AIASKA INC 135300
MCF Flaredgasamounl in MCF. NO DECIMALS. TECK COMINCO ALASKA INCORPORATED 141207
UNION OIL CO OF CALIFORNIA 145000
XTO ENERGY INC 146700
EXXONMOBIL ALASKA PROD 118575
STATE OF ALASKA
ALASKA OIL AND GAS CONSERVATION COMMISSION
FACILITY REPORT OF PRODUCED GAS DISPOSITION
1. Facility Number
890000001
2. Facility
Name
PTU
3. Field
Point Thomson
4. Oporalur
ExaonMobil Alaska Production Inc.
5. Mondv(etrof Disposition
July 2O16
Dlsposieon
Volume MCF
20. Forpmduchon hom mulOp/e pools, oat contribution Of each Pool as a percent o1 Total Volume.
S. Sold
0
Pad Name Pod Code Percent
7. Reinfected
510,310
Thomson Oil 669150 100
e. Flared or vented l hour or less
13.199
S. Flared or vented man Nan l hour (a"
Insir.)
50,113
10. Pilot and Purge
204
11. Assist Gas
0
12. Fuel gas used in lease operation%.
38,860
13. Other (ceatnstructiore)
0
Official Use Orgyrilati
Aulhoon >1 hr
Brialy
MCF
14. TOTAL VOLUME (ITEMS 9&13)
612,686
Lease Use
15. NGL Geo Equivalent
Conservation
LOACF
16. Purchased gas
Waste
17. Transferred from.
Commissioner Dale
19. Transferred to (Express as a negative
19. Remarks. 0
0
Note: If Oaring events greater than 1 hour, complete the information below:
0
0
1 hereby lentil that the foregoing is true and correct to the best of my knowledge.
/L
signawmyv'/r7C — Title Revenue Accountant
Printed Name Tyson Mayers Phone (932) 624-2413 Date 9/16120161
Note: All volumes must be corrected to
pressure o/ 14.65 psia and to a temperature
Of 60o F. Authority 20 AAC25.235.
-5'/31/4
GAS DISPOSITION IMPORT FORM FOR FLARING EVENTS GREATER THAN 1 HOUR
R Mate
O No Fadli No
Date Flared
Start Time
EndingTime
End Data
Plan netl
MCF
Desai tion of Flarin Event
Action Taken to Minimize Volume
7/112016
118575 0890000001
7113/2016
13.13
18:26
7/132016
P
6,498
Startup and lest none of second gas injection compressor. Flowing well to flare to
achieve minimum facility temperature and rate to commence compressor tun after
eeended shutdown period.
Began the compressor run once minimum conditions were achieved and
shut in the well at completion of the compressor non.
7/12016
118575 0890000001
7/15/2016
08:01
2259
7/152016
P
16,388
Startup and test runs of second gas injection compressor. Flowing well to flare to
achieve minimum facility temperature and rate to commence compressor run after
extended shutdown Period.
Began the compressor non once minimum conditions were achieved and
shut in the well when compressor tripped.
71112016
118575 0890000001
]/162016
12:53
1921
711612016
P
7,691
Planned restart of facility for sewn gas injection compressor commissioning run.
Began the compressor run once minimum conditions were achieved and
shut in the well at completion of the compressor run.
7/12016
118575 0890000001
7/192016
17:39
1910
7/19/2016
P
818
Pressuring up the facility to run the turbine generators on fuel gas.
Flowing well at minimum rates to maintain adequate fuel gas temperature.
7/12016
118575 0890000001
7212016
06:47
1104
7212016
P
3,810
Planned restart of facility for second gas injection compressor commissioning run.
Began the compressor run once minimum conditions were achieved and
shut in the well at completion of the compressor run.
7/1/2016
118575 0890000001
7/212016
12:43
18:26
7/21/2016
P
4,269
Planned restad of facility for second gas injection compressor commissioning run.
Began the compressor run once minimum conditions runs were achieved and
shut in the well at completion of the compressor run.
7/12016
118575 0090000001
7242016
11:55
20:04
7242016
P
6,050
Planned restart of facility for second gas injection compressor commissioning run.
Began the compressor run once minimumconditions
in were achieved and
shut in the well at completion of the compressor non.
7/1/2016
118575 0890000001
71262016
15:06
18.03
72612016
P
897
Pressunng up the facility to run the turbine generators on fuel gas.
Flowing well at minimum rates to maintain adequate fuel gas temperature.
]/12016
118575 0890000001
72612016
23:46
07:39
7272016
U
1,134
Process upset associated with the test runs of gas injection compressor,
Constrained well rate and flow until the facility was back in normal
operating parameters.
7/12016
118575 0890000001
7/302016
2235
11:56
7/31/2016
P
2,460
Planned restart of facility for second gas injection compressor commissioning run.
Achieve normal running stale as soon as possible to commence
reinjection
7/12016
118575 0890000001
7/312016
22:38
23:59
7/312016
U
98
Flash Gas compressor trip due to instrumentation malfunction.
Secure compressor and make repairs.
Directions
R t0ate
O No
This Excel spreadsheet has column headings and data formattingto import Bari events over o no
mm/01/yyyy Use first day of the month.
Six digits. Sae list of operators in neN column.
o the AOGCC database. Co and paste the headin s into an Excel sheet and enter all flaring events over one hour for the month under thea roriate
O erator Names Operator Numbers
AURORA GAS LLC 110800
FacilityNo
Ten digits, On form 10422 or call (907) 793-1241.
BP EXPLORATION (ALASKA) INC
112300
Date Flared
mm/dN
MARATHON OIL CO
129000
Star)Time
Military time: 00: 00 to 23:59
NORTH SLOPE BOROUGH
131300
Ending Time
Military time: 00:00 to 23:59
PACIFIC ENERGY RESOURCES LTD
131900
End Date
mmlddlyyyy
CONOCOPHILLIPS ALASKA INC
134200
Planned
"U" for unplanned event or"P"for planned event.
PIONEER NATURAL RESOURCES ALASKA INC
135300
MCF
Flared gas amount in MCF. NO DECIMALS.
TECK COMINCO ALASKA INCORPORATED
141200
UNION OIL CO OF CALIFORNIA
145000
XTO ENERGY INC
146700
EXXONMOBIL ALASKA PROD
118575
STATE OF ALASKA
ALASKA OIL AND GAS CONSERVATION COMMISSION
FACILITY REPORT OF PRODUCED GAS DISPOSITION
1. Facility Number
890000001
2. Facility
Name
PTU
3. Field
Point Thomson
4. Operator
EmonMobil Alaska Production Inc.
5. Monthfyear of Disposition
August 2016
Disposition
Volume MCF
20. For production from multiple pools,
list contribution of each pool as a percent of Total Volume.
6.
Sold
0
Pool Name
Pool Code Percent
7.
Reinjected
671,149
Thomson Oil
668150 100
8.
Flared or vented 1 hour or less
4,745
9. Flared or vented more than 1 hour (see
instr.)
5,648
10.
Pilot and Purge
195
11.
Assist Gas
0
12. Fuel gas used in lease operations.
49,301
13.
Other (see instructions)
0
Official Use Only
Authorization >1 hr:
Safety
�/ q 8
(o
MCIF /
l
14. TOTAL VOLUME (ITEMS 8.13)
731,037
Lease Use
MCF
15. NGL Gas Equivalent
Conservation
MCF
16.
Purchased gas
Waste:
MCF
17.
Transferred from:
Commissioner
Date
18.
#)
Transferred to: (Express as a negative
19.
Remarks: 0
0
Note: If flaring events greater than 1 hour, complete
0
0
the information below:
1 hereby certify that the foregoing is true and correct to the best of my knowledge.
Signature �t 2: Title Revenue Accountant
Printed Name Tyson Mayers Phone (832) 624-2413
ct I�C�I2�jl/
Date l0
Note: All volumes must be corrected to pressure of
14.65 psia and to a temperature of 60o F. Authority 20
AAC25.235.
GAS DISPOSITION IMPORT FORM FOR FLARING
EVENTS GREATER THAN 1 HOUR
R tDate
0 No
Facili No
Date Flared
Start Time
EndingTime
End Date
Planned
MCF
Description of Flarin Event
Action Taken to Minimize Volume
Continuation of event on
7/31; flash gas compressor
Secure compressor and make
8/1/2016
118575
0890000001
8/1/2016
00:00
14:17
8/1/2016
U
1,023
trip due to instrumentation
repairs.
malfunction.
Flash gas compressor trip
Shut down facility for compressor
8/1/2016
118575
0890000001
8/2/2016
15:18
10:49
8/3/2016
U
1,462
due to instrumentation
malfunction.
repairs.
Re-start of injection gas
compressor; initially ran
Started flash gas compressor as
8/1/2016
118575
0890000001
8/8/2016
17:11
12:54
8/9/2016
P
1,610
without flash gas
soon as possible.
compressor.
Re-start of injection gas
compressor; initially ran
Started flash gas compressor as
8/1/2016
118575
0890000001
8/11/2016
19:18
10:21
8/12/2016
P
453
without flash gas
soon as possible.
compressor.
Re-start of injection gas
compressor; initially ran
Started flash gas compressor as
8/1/2016
118575
0890000001
8/30/2016
17:51
21:52
8/30/2016
P
711
without flash gas
soon as possible.
compressor.
Re-start of injection gas
compressor; initially ran
Started flash gas compressor as
8/1/2016
118575
0890000001
8/31/2016
10:14
11:46
8/31/2016
P
389
without flash gas
soon as possible.
compressor.
This Excel spreadsheet has column headings and data formatting to import flaring events over one hour into the AOGCC database. Copy and paste the headings into an
Directions
Excel sheet and enter all flaring events over one hour for the month under the appropriate columns per instructions below. One operator can enter all events from all
associated facilities.
RptDate
mm/01/yyyy Use first day of the month. Operator Names Operator Numbers
O No
Six digits. See list of operators in next column. AURORA GAS LLC 110800
Facilit No
Ten digits. On form 10-422 or call (907) 793-1241. BP EXPLORATION ALASK 112300
Date Flared
mm/dd/yyyy MARATHON OIL CO 129000
Start Time
Military time: 00:00 to 23:59 NORTH SLOPE BOROUGH 131300
Endin Time
Military time: 00:00 to 23:59 PACIFIC ENERGY RESOU 131900
End Date
mm/dd/yyyy CONOCOPHILLIPS ALASKA134200
Planned
"U" for unplanned event or "P" for planned event. PIONEER NATURAL RESO 135300
MCF
Flared gas amount in MCF. NO DECIMALS. TECK COMINCO ALASKA I 141200
UNION OIL CO OF CALIFO 145000
XTO ENERGY INC 146700
EXXONMOBIL ALASKA PRC 118575
STATE OF ALASKA
ALASKA OIL AND GAS CONSERVATION COMMISSION
1. Facility Number
890000001
2. Facility
Name
PTU
3. Field
Point Thomson
4. Operator
EmunMohl Alaska Production Inc.
5. Month/year of Disposition
September 2016
Disposition
Volume MCF
20. For production from multiple pools, list contribution ofeach pool as a poment of Total Volume.
6. Sold
0
Pool Name Poolcode Percent
7. Reinjected
0
Thomson Oil 668150 100
8. Flared or vented 1 lour or less
3,292
9. Flared or vented mora than 1 hour (see
instr.)
661
10. Pilot and Purge
150
11. Assist Gas
0
12. Fuel gas used in lease operations.
36,614
13. Other (see Instructions)
0
Official Use Only
Authorization hr./
Safety
/ t
f W
MCF
14, TOTAL VOLUME (ITEMS 6.13)
42 917
Lease Use
MCF
15. NGL Gas Equivalent
Conservation
MCF
16. Purchased gas
Waste:
MCF
17. Transfe"cifrom:
Commisaoner Date
18. Tmnsferred to: (Express as a negative
N)
19, Remarks: 0
0
Note: if flaring events greater than 1 hour, complete the Information below:
0
0
thereby codify that the foregoing is two and correct to the best of my knowledge.
Note: All volumes must be corrected to
Signature Z 14 r Title Revenue Accountantpressure of 14.65 psia and to a temperature
L/ Uio I� 201 of 60o F. Authority 20 AAC25.235.
Printed Name Tyson Mayers Phone (832) 624.2413 Date
V 7-L-
10 / 2,5
-t^10/2,5 �
GAS DISPOSITION IMPORT FORM FOR FLARING
EVENTS GREATER THAN 1 HOUR
R tDate
O No
Facilit No
Date Flared
Start Time
EndingTime
End Date
Planned
MCF
Description of FlaringEvent
Action Taken to Minimize Volume
9/1/2016
118575
0890000001
9/12/2016
13:25
14:49
9/12/2016
P
241
Conducted work on fuel gas
heaters; routed fuel to flare
from turbine bypass package
in order to keep turbine
online.
Completed heater work as soon as
possible.
9/1/2016
118575
0890000001
9/18/2016
15:17
17:52
9/18/2016
P
225
Conducted tuning work on
turbines to improve transition
between diesel and gas fuel;
flared to get steady flow
during tuning work.
Completed tuning work as soon as
possible.
9/1/2016
118575
0890000001
9/19/2016
13:01
14:09
9/19/2016
P
195
Conducted tuning work on
turbines to improve transition
between diesel and gas fuel;
flared to get steady flow
during tuning work.
Completed tuning work as soon as
possible.
6tDatThis
Excel spreadsheet has column headings and data formatting to import flaring events over one hour into the AOGCC database. Copy and paste the headings into an
Excel sheet and enter all flaring events over one hour for the month under the appropriate columns per instructions below. One operator can enter all events from all
associated facilities.
e
mm/01/yyyy Use first day of the month.
O erator Names O erator Numbers
Six digits. See list of operators in next column.
AURORA GAS LLC 110800
Ten digits. On form 10-422 or call (907) 793-1241.
BP EXPLORATION ALAS 112300
Date Fared
mm/dd/yyyy
MARATHON OIL CO 129000
Start Time
Military time: 00:00 to 23:59
NORTH SLOPE BOROUGH 131300
Endin Time
Military time: 00:00 to 23:59
PACIFIC ENERGY RESOUR 131900
End Date
mm/dd/yyyy
CONOCOPHILLIPS ALASKP 134200
Planned
"U" for unplanned event or "P" for planned event.
PIONEER NATURAL RESOL 135300
MCF
Flared gas amount in MCF. NO DECIMALS.
TECK COMINCO ALASKA I 141200
UNION OIL CO OF CALIFOF 145000
XTO ENERGY INC 146700
EXXONMOBIL ALASKA PRC 118575
STATE OF ALASKA
ALASKA OIL AND GAS CONSERVATION COMMISSION
FACILITY REPORT OF PRODUCED GAS DISPOSITION
1. Facility Number
890000001
2. Facility
Name
PTU
3. Field
Point Thomson
4. Operator
ExxonMobil Alaska Production Inc.
th/Year of Disposition
70,tMber2016
Disposition
Volume MCF
20. For production from multiple pools, list contribution of each pool as a percent of Total Volume.
6. Sold
0
Pool Name Pool Code Percent
7. Reinjected
722,459
Thomson Oil 668150 100
8. Flared or vented 1 hour or less
3,519
9. Flared or vented more than 1 hour (see
instr.)
247,420
10. Pilo[ and Purge
199
11. Assist Gas
0
12. Fuel gas used in lease operations.
56,410
13. Other (see instructions)
0
Official Use Only
Authorization hr:
Safety ZL�
7
MCF rr
J4
14. TOTAL VOLUME (ITEMS 6-13)
1,030,007
Lease Use
MCF
15. NGL Gas Equivalent
Conservation
MCF
16. Purchased gas
Waste:
MCF
17. Transferred from:
—2--f(,-17
Commissioner Date
18. Transferred to: (Express as a negative
#)
19. Remarks: 0
0
Note: If flaring events greater than 1 hour, complete the information below:
0
0
1 hereby certify that the foregoing is true and correct to the best of my knowledge.
rn1
Signature Title Revenue Accountant
Printed Name Tyson Mayers Phone (832) 624-2413 Date 11 IN 2OI
Note: All volumes must be corrected to
pressure of 14.65 psia and to a temperature
of 60o F. Authority 20 AAC25.235.
J7L
GAS DISPOSITION IMPORT FORM
R tDate
FieIdP001 O No Facili No Sold Rein act FlareLT FlareGTR PilotPu a Assist Gas Used Other TotaIMCF
422NGLS MCF PurchGas XFERSFrom XFERSTo Comments
10/01/2016
0 178575 890000001 0 1 722,459 3,519 247,420 199 1 0 1 56,410 0 1,030,007
0 1 0 1 0 1 0
Itext
Directions
This Excel spreadsheet has the column headings and data formatting to import monthly gas dis osition into the AOGCC database. Copy and paste the heading into an Excel sheet and enter all gas
R tDate
mm 01/yyyy Use first day of the month.
FleldPool
Enter"0"
O No
Six dlglt operator number. See list of operators below.
FacilityNo
Ten digits. On form 10-422 or call 793-1241.
Form
10.422
Block R:
Operator Names
Numbers
Sold
6
These 13 columns represent volumes (MCF) entered on the 10-422 monthly disposition form. Enter whole numbers, positive
or negative. If volume is zero, enter "0".
AURORA GAS LLC
110800
Reinject 7
BP EXPLORATION (ALASKA) INC
112300
FlareLT 8
MARATHON OIL CO
129000
FlareGTR 9
NORTH SLOPE BOROUGH
131300
PIIotPur a 10
PACIFIC ENERGY RESOURCES LTD
131900
Assist Gas 11
CONOCOPHILLIPS ALASKA INC
134200
Used 12
PIONEER NATURAL RESOURCES ALASKA INC
135300
Other 13
TECK COMINCO ALASKA INCORPORATED
141200
TotaIMCF 14
UNION OIL CO OF CALIFORNIA
145000
422NGLS MCF 15
XTO ENERGY INC
146700
PurchGas 16
EXXONMOBIL ALASKA PRODUCTION INC
118575
XFERSFrom 17
XFERSTo 18
Comments 19
From: Motteram, Luke A jmailto:luke.a.motteram@exxonmobil.com]
Sent: Tuesday, November 01, 2016 4:49 PM
To: Loepp, Victoria T (DOA) <victoria.loepp@alaska.gov>; Roby, David 5 (DOA) <dave roby(@alaska.gov>
Cc: EM Alaska Correspondence /SM<emalaskacorrespondence@exxonmobil.com>
Subject: RE: ExxonMobil Point Thomson - Flare Event Notification: 10/29 - 10/31
Dave, I b ) 3 I
Following up yesterday's communication: the Point Thomson flare event outlined below ceased around
11pm last night. Flared gas was at the lower end of estimates, approximately 230MMscf in total, which
will be documented on the October 10-422 form.
Regards,
Luke Motteram
Production Engineer
ExxonMobil Alaska Production
From: Motteram, Luke A
Sent: Monday, October 31, 2016 1:15 PM
To: Victoria. LoeppC�alaska.gov; Dave. RobyCaalaska.gov
Cc: EM Alaska Correspondence /SM
Subject: ExxonMobil Point Thomson - Flare Event Notification: 10/29 - 10/31
Victoria,
Further to our conversation today, a flaring event commenced at Point Thomson on 10/29 due to
shutdown of both gas injection compressors. Production to flare is continuing in order to complete a
regulatory required pig run on a pipeline that is supplied in part by Point Thomson condensate. The
pipeline is not operated by ExxonMobil, however mandatory smart pigging was delayed by the operator
of the pipeline pending stable production from Point Thomson.
It is anticipated that flaring will continue until the evening of 10/31 with a total estimated volume of
approximately 350MMscf. Once the pig is received at Endicott, Point Thomson will immediately cease
flaring and associated production. All flare volumes will be reported to AOGCC on the 10-422 monthly
gas disposition report.
Regards,
Luke Motteram
Production Engineer
ExxonMobil Alaska Production
STATE OF ALASKA
ALASKA OIL AND GAS CONSERVATION COMMISSION
FACILITY REPORT OF PRODUCED GAS DISPOSITION
1. Facility Number
690000001
2, Facility
Name
PTU
3. Field
Point Thomson
4, Operator
EmonMobil Alaska Production Inc.
5 MonthtYear of Disposition
November 2016
Disposition
Volume MCF
20. For production from multiple pools, list contribution of each pool as a percent of Total
Volume
6 Sold
0
Pool Name Pool Code Percent
7. Reinjected
1,046,093
Thomson Old 668150 too
8. Flared or vented l hour or less
3,052
9. Flared or vented more than 1 hour
(see inslr.)
8,625
10. Pitot and Purge
7
11. Assist Gas
0
12. Fuel gas used in lease operations.
60,068
13. Other (see instructions)
0
Official UseAuthorization
Authorization >7 hr
Safety �
Z
MCF 6�
14. TOTAL VOLUME (ITEMS &13)
1,118,005
Lease Use
MCF
15. NGL Gas Equivalent
Conservation
MCF
16. Purchased gas
Waste:
MCF
17. Transferred from:
Commissioner Date
18. Transferred to: (Express as a
negative u)
19. Remarks: 0
0
Note: If flaring events greater than 1 hour, complete the information below:
0
0
I hereby certify that the foregoing Is true and correct to the best of my knowledge
Note: All volumes must be corrected
Signature I Title Revenue Aoceuntanl to pressure of 14.65 psia and to a
temperature of 60o F. Authority 20
Printed Name Tyson Mayers Phone (832) 624-2413 Dale la 16 AAC25.235.
L—
/ q—
GAS DISPOSITION IMPORT FORM FOR FLARING EVENTS GREATER THAN 1 HOUR
O No
Facilit No
Date Flared
Start Time
Endin Time
End Date
Planned
MCF
Descri tion of Flarin Event
Action Taken to Minimize Volume
Shutdown for inspection of Train 2
Compressor restarted following
118575
0890000001
11/13/2016
13:21
17:25
11/13/2016
P
401
inectioncom ressor.
ins ection.
7Rt/D7ate
Multiple attempts to start flash gas
118575
0890000001
11/14/2016
04:32
11:17
11/15/2016
P
1,983
compressor without success; Train
Work on repairs to flash gas compressor.
2 injection compressor online.
Multiple attempts to start flash gas
11/1/2016
118575
0890000001
11/15/2016
16:26
17:42
11/16/2016
P
1,712
compressor without success; Train
Work on repairs to flash gas compressor.
2 injection compressor online.
11/1/2016
118575
0890000001
11/17/2016
22:01
02:27
11/18/2016
P
777
Startup of Train 2 compressor
Start flash gas compressor once Train 2 is
ahead of flash gas com ressor.
stable.
Process shutdown due to pipeline
11/1/2016
118575
0890000001
11/18/2016
22:06
23:53
11/18/2016
U
239
valve downstream of Point
Restart once pipeline valve is open.
Thomson qoina closed.
Depressure Train 2 injection
Repair / clean first stage scrubber level
11/1/2016
118575
0890000001
11/21/2016
06:47
09:12
11/21/2016
P
382
compressor to work on scrubber
transmitters on train 2 compressor.
level transmitter.
11/1/2016
118575
0890000001
11/21/2016
21:39
09:47
11/22/2016
P
1,216
Startup of Train 2 compressor
Start flash gas compressor once Train 2 is
ahead of flash qas compressor.
stable.
Shutdown Train 2 and depressure
Repair tubing fitting, restart compressor
11/1/2016
118575
0890000001
11/24/2016
21:02
22:42
11/24/2016
U
233
to work on well injection flow
and process.
meter.
Flash gas compressor shut down,
Stabilize process, then restart flash gas
11/1/2016
118575
0890000001
11/25/2016
06:52
11:03
11/25/2016
U
659
tripped by process instability.
compressor.
11/1/2016
118575
0890000001
11/27/2016
20:08
01:17
11/28/2016
P
681
Startup of Train 2 compressor
Restart flash gas compressor once Train
ahead of flash qas compressor.
2 is stable.
11/1/2016
118575
0890000001
11/28/2016
12:06
14:22
11/28/2016
U
342
Shutdown on facility trip due to
Repair heat trace circuits and continue to
heat trace issues malfuction.
monitor.
8,625
This Excel spreadsheet has column headings and data formatting to import flaring events over one hour into the AOGCC database. Copy and paste the headings into an Excel sheet
Directions
and enter all flaring events over one hour for the month under the appropriate columns per instructions below. One operator can enter all events from all associated facilities.
R tDate
mm/01/yyyy Use first day of the month. Operator Names Operator Numbers
O No
Six digits. See list of operators in next column. AURORA GAS LLC 110800
FacilityNo
Ten digits. On form 10-422 or call (907) 793-1241. BP EXPLORATION ALASKA INC 112300
Date Flared
mm/dd/yyyy MARATHON OIL CO 129000
Start Time
Military time: 00:00 to 23:59 NORTH SLOPE BOROUGH 131300
Ending Time
Military time: 00:00 to 23:59 PACIFIC ENERGY RESOURCES L 131900
End Date
mm/dd/yyyy CONOCOPHILLIPS ALASKA INC 134200
Planned
"U" for unplanned event or "P" for planned event. PIONEER NATURAL RESOURCE 135300
MCF
Flared gas amount in MCF. NO DECIMALS. ITECK COMINCO ALASKA INCORq 141200
STATE OF ALASKA
ALASKA OIL AND GAS CONSERVATION COMMISSION
FACILITY REPORT OF PRODUCED GAS DISPOSITION
1. Facility Number
890000001
2. Facility
Name
PTU
3. Field
Point Thomson
4. Operator
ExxonMobil Alaska Production Inc.
5. Monthlyear of Disposition
December 2016
Disposition
Volume MCF
20. For production from multiple pools, list contribution of each pool as a percent of Total Volume.
6. Sold
0
Pool Name Pool Code Percent
7. Reinjected
3,913,523
Thomson Oil 668150 100
8. Flared or vented 1 hour or less
3,328
9. Flared or vented more than 1 hour (see
instr.)
17,756
10. Pilot and Purge
200
11. Assist Gas
0
12. Fuel gas used in lease operations.
122,704
13. Other (see instructions)
0
Official Use Only
Authorization>1 hr.
Safety
—
�/��-/�
14. TOTAL VOLUME (ITEMS 6-13)
4,057,512
Lease Use
MCF
15. NGL Gas Equivalent
Conservation
MCF
16. Purchased gas
Waste:
MCF
17. Transferred from:
L J Commissioner Date
18. Transferred to: (Express as a negative
19. Remarks: 0
0
Note: If flaring events greater than 1 hour, complete the information below:
0
0
1 hereby certify that the foregoing is true and correct to the best of my knowledge.
Note: All volumes must be corrected to
Signature 1 Title Revenue Accountant pressure of 14.65 psia and to a temperature
Printed Name Tyson Mayers Phone (832) 624-2413 Date I I� 201, of 60o F. Authority 20 AAC25.235.
GAS DISPOSITION IMPORT FORM FOR FLARING EVENTS GREATER THAN 1 HOUR
R tDate
I O No
FacilityNo
I Date Flared
Start Time
Ending Time
End Date
Planned
I MCF
Description of Flaring Event
Action Taken to Minimize Volume
Startup of Train 2 compressor with
12/1/2016
118575
0890000001
12/1/2016
15:26
03:55
12/2/2016
P
519
unsuccessful attempts to run flash gas
Attempted to reinstate flash gas
compressor.
compressor.
12/1/2016
118575
0890000001
12/2/2016
13:30
18:12
12/2/2016
P
616
Startup of Train 2 compressor after
Completed Train 2 and flash gas
repairs.
compressor startup.
Shut down and depressurize Train 1
12/1/2016
118575
0890000001
12/4/2016
09:24
11:29
12/4/2016
P
389
compressor for inspection after
Completed depressurization.
introduction of hydrocarbons.
12/1/2016
118575
0890000001
12/5/2016
2045
02:10
12/6/2016
U
388
Flash gas compressor tripped due to
Repaired broken wire and re -started
faulty temperature transmitter.
compressor.
Train 2 compressor start without flash gas
Restarted flash gas compressor and flare
12/1/2016
118575
0890000001
12/8/2016
01:11
11:13
12/9/2016
P
4,075
compressor; then plant shutdown and
rates were stabilized; completed
depressurized for inspection of Train 1.
depressurization.
12/1/2016
118575
0890000001
12/10/2016
1518
01:22
12/11/2016
P
748
Failed starts of Train 2 compressor.
Fixed compressor exitator and 2nd Ttag—e—
dump sequence.
12/1/2016
118575
0890000001
12/11/2016
10:24
12:54
12/11/2016
P
131
Restarted Train 1 and Train 2.
Completed compressor start-up and flare
rates stabilized.
Multiple trips/inspections and attempted
Inspected and repaired equipment and
12/1/2016
118575
0890000001
12/11/2016
20:30
11:37
12/14/2016
U
7,045
re -starts of injection compressors and
restarted with stabilized flare rates as
flash gas compressor.
quickly as possible.
12/1/2016
118575
0890000001
12/15/2016
1147
13:46
12/15/2016
P
582
Compressor brought down for repairs.
Completed replacement and restarted
compressors.
12/1/2016
118575
0890000001
12/16/2016
04:25
10:32
12/16/2016
P
576
Compressor brought down to inspect
Plant fully shut down.
Train 1.
12/1/2016
118575
0890000001
12/17/2016
1209
13:40
12/17/2016
P
503
Normal stop on compressors.
Resumed normal compressor operations.
12/1/2016
118575
0890000001
12/27/2016
21:31
11:39
12/28/2016
U
1,693
Full plant trip on logic issue during
Removed logic and restarted
blowdown of Train 2.
compressors.
12/1/2016
118575
0890000001
12/29/2016
19:16
23:12
12/29/2016
U
491
Flash gas compressor tripped.
Restarted flash gas compressor and flare
rates were stabilized.
l��sCv
Directions
This Excel spreadsheet has column headings and data formatting to import flaring events over one hour into the AOGCC database. Copy and paste the headings into an Excel sheet and
enter all flaring events over one hour for the month under the appropriate columns per instructions below. One operator can enter all events from all associated facilities.
R tDate
mm/01/yyyy Use first day of the month. Operator Names Operator Numbers
O No
Six digits. See list of operators in neM column. AURORA GAS LLC 110800
Facili No
Ten digits. On form 10-422 or call (907) 793-1241. BP EXPLORATION ALASKA INC 112300
Date Flared
mm/dd/yyyy MARATHON OIL CO 129000
Start Time
Milita time: 00:00 to 23:59 NORTH SLOPE BOROUGH 131300
Ending Time
Military time: 00:00 to 23:59 PACIFIC ENERGY RESOURCES LTD 131900
End Date
mm/dd/ CONOCOPHILLIPS ALASKA INC 134200
Planned
"U" for unplanned event or "P" for planned event. PIONEER NATURAL RESOURCES ALAS 135300
MCF
Flared gas amount in MCF. NO DECIMALS. TECK COMINCO ALASKA INCORPORA 141200
UNION OIL CO OF CAI IFORNIA 1ARnnn